ML15110A026: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15110A026
| number = ML15110A026
| issue date = 04/28/2015
| issue date = 04/28/2015
| title = Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 (TAC Nos. MF1129, MF1130, MF1131, and MF1132)
| title = Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051
| author name = Paige J C
| author name = Paige J
| author affiliation = NRC/NRR/JLD
| author affiliation = NRC/NRR/JLD
| addressee name = Orphanos P M
| addressee name = Orphanos P
| addressee affiliation = Exelon Generation Co, LLC
| addressee affiliation = Exelon Generation Co, LLC
| docket = 05000220, 05000410
| docket = 05000220, 05000410
| license number =  
| license number =  
| contact person = Paige J C, NRR/JLD, 415-5888
| contact person = Paige J, NRR/JLD, 415-5888
| case reference number = EA-12-049, EA-12-051, TAC MF1129, TAC MF1130, TAC MF1131, TAC MF1132
| case reference number = EA-12-049, EA-12-051, TAC MF1129, TAC MF1130, TAC MF1131, TAC MF1132
| document type = Audit Report, Letter
| document type = Audit Report, Letter
| page count = 23
| page count = 23
| project = TAC:MF1129, TAC:MF1130, TAC:MF1131, TAC:MF1132
| project = TAC:MF1129, TAC:MF1130, TAC:MF1131, TAC:MF1132
| stage = Other
| stage = Acceptance Review
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Peter M. Orphanos Site Vice President Nine Mile Point Nuclear Station 348 Lake Road Oswego, NY 13126 April 28, 2015
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 28, 2015 Mr. Peter M. Orphanos Site Vice President Nine Mile Point Nuclear Station 348 Lake Road Oswego, NY 13126


==SUBJECT:==
==SUBJECT:==
NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 -REPORT FOR THE ONSITE AUDIT REGARDING IMPLEMENTATION OF MITIGATING STRATEGIES AND RELIABLE SPENT FUEL INSTRUMENTATION RELATED TO ORDERS EA-12-049 AND EA-12-051 (TAC NOS. MF1129, MF1130, MF1131, AND MF1132)  
NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 - REPORT FOR THE ONSITE AUDIT REGARDING IMPLEMENTATION OF MITIGATING STRATEGIES AND RELIABLE SPENT FUEL INSTRUMENTATION RELATED TO ORDERS EA-12-049 AND EA-12-051 (TAC NOS. MF1129, MF1130, MF1131, AND MF1132)


==Dear Mr. Orphanos:==
==Dear Mr. Orphanos:==


On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events" and Order EA-12-051, "Order to Modify Licenses With Regard To Reliable Spent Fuel Pool Instrumentation," (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML 12054A736 and ML 12054A679, respectively).
On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events" and Order EA-12-051, "Order to Modify Licenses With Regard To Reliable Spent Fuel Pool Instrumentation," (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML12054A736 and ML12054A679, respectively). The orders require holders of operating reactor licenses and construction permits issued under Title 1O of the Code of Federal Regulations Part 50 to submit for review, Overall Integrated Plans (OIPs) including descriptions of how compliance with the requirements of of each order will be achieved.
The orders require holders of operating reactor licenses and construction permits issued under Title 1 O of the Code of Federal Regulations Part 50 to submit for review, Overall Integrated Plans (OIPs) including descriptions of how compliance with the requirements of Attachment 2 of each order will be achieved.
By letter dated February 28, 2013 (ADAMS Accession No. ML13066A171 ), Exelon Generation, LLC, previously as Constellation Energy Nuclear Group, LLC (Exelon, the licensee) submitted its OIP for Nine Mile Point Nuclear Station, Units 1 and 2 (NMP), in response to Order EA 049. By letter dated March 8, 2013 (ADAMS Accession No. ML13074A056), Exelon submitted a complete revision of the OIP for NMP. By letters dated August 27, 2013, February 27, 2014, August 26, 2014, and February 19, 2015 (ADAMS Accession Nos. ML13254A278, ML14069A318, ML14241A380, and ML15062A036, respectively), the licensee submitted its first four six-month updates to the OIP. By letter dated August 28, 2013 (ADAMS Accession No. ML13234A503), the NRC notified all licensees and construction permit holders that the staff is conducting audits of their responses to Order EA-12-049 in accordance with NRC Office of Nuclear Reactor Regulation (NRR) Office Instruction LIC-111, "Regulatory Audits" (ADAMS Accession No. ML082900195). This audit process led to the issuance of the NMP interim staff evaluation (ISE) (ADAMS Accession No. ML13225A584) and continues with in-office and onsite portions of this audit.
By letter dated February 28, 2013 (ADAMS Accession No. ML 13066A 171 ), Exelon Generation, LLC, previously as Constellation Energy Nuclear Group, LLC (Exelon, the licensee) submitted its OIP for Nine Mile Point Nuclear Station, Units 1 and 2 (NMP), in response to Order EA-12-049. By letter dated March 8, 2013 (ADAMS Accession No. ML 13074A056), Exelon submitted a complete revision of the OIP for NMP. By letters dated August 27, 2013, February 27, 2014, August 26, 2014, and February 19, 2015 (ADAMS Accession Nos. ML 13254A278, ML 14069A318, ML 14241 A380, and ML 15062A036, respectively), the licensee submitted its first four six-month updates to the OIP. By letter dated August 28, 2013 (ADAMS Accession No. ML 13234A503), the NRC notified all licensees and construction permit holders that the staff is conducting audits of their responses to Order EA-12-049 in accordance with NRC Office of Nuclear Reactor Regulation (NRR) Office Instruction LIC-111, "Regulatory Audits" (ADAMS Accession No. ML082900195).
 
This audit process led to the issuance of the NMP interim staff evaluation (ISE) (ADAMS Accession No. ML 13225A584) and continues with in-office and onsite portions of this audit.
P. Orphanos                                     By letter dated February 28, 2013 (ADAMS Accession No. ML13066A172), the licensee submitted its 01 P for NMP in response to Order EA-12-051. By letter dated June 5, 2013 (ADAMS Accession No. ML13154A399), the NRG staff sent a request tor additional information (RAI) to the licensee. By letters dated July 5, 2013, August 27, 2013, February 24, 2014, August 26, 2014, and February 19, 2015 (ADAMS Accession Nos. ML13197A220, ML13254A279, ML14069A180, ML14241A016, and ML15062A035, respectively), the licensee submitted its RAI responses and first tour six-month updates to the OIP.
P. Orphanos By letter dated February 28, 2013 (ADAMS Accession No. ML 13066A 172), the licensee submitted its 01 P for NMP in response to Order EA-12-051.
The NRG staff's review to date led to the issuance of the NMP ISE and RAI dated November 15, 2013 (ADAMS Accession No. ML13281A205). By letter dated March 26, 2014 (ADAMS Accession No. ML14083A620), the NRG notified all licensees and construction permit holders that the staff is conducting in-office and onsite audits of their responses to Order EA 051 in accordance with NRG NRR Office Instruction LIG-111, as discussed above.
By letter dated June 5, 2013 (ADAMS Accession No. ML 13154A399), the NRG staff sent a request tor additional information (RAI) to the licensee.
The ongoing audits allow the staff to review open and confirmatory items from the mitigation strategies ISE, RAI responses from the spent fuel pool instrumentation (SFPI) ISE, the licensee's integrated plans, and other audit questions. Additionally, the staff gains a better understanding of submitted and updated information, audit information provided on ePortals, and preliminary Overall Program Documents/Final Integrated Plans while identifying additional information necessary for the licensee to supplement its plan and staff potential concerns.
By letters dated July 5, 2013, August 27, 2013, February 24, 2014, August 26, 2014, and February 19, 2015 (ADAMS Accession Nos. ML 13197 A220, ML13254A279, ML14069A 180, ML14241 A016, and ML15062A035, respectively), the licensee submitted its RAI responses and first tour six-month updates to the OIP. The NRG staff's review to date led to the issuance of the NMP ISE and RAI dated November 15, 2013 (ADAMS Accession No. ML 13281A205).
In support of the ongoing audit of the licensee's OIPs, as supplemented, the NRG staff conducted an onsite audit at NMP from November 3-7, 2014, per the audit plan dated October 8, 2014 (ADAMS Accession No. ML14274A288). The purpose of the onsite portion of the audit was to provide the NRG staff the opportunity to continue the audit review and gain key insights most easily obtained at the plant as to whether the licensee is on the correct path tor compliance with the Mitigation Strategies and SFPI orders. The onsite activities included detailed analysis and calculation discussion, walk-throughs of strategies and equipment laydown, visualization of portable equipment storage and deployment, staging and deployment of offsite equipment, and physical sizing and placement of SFPI equipment.
By letter dated March 26, 2014 (ADAMS Accession No. ML14083A620), the NRG notified all licensees and construction permit holders that the staff is conducting in-office and onsite audits of their responses to Order EA-12-051 in accordance with NRG NRR Office Instruction LIG-111, as discussed above. The ongoing audits allow the staff to review open and confirmatory items from the mitigation strategies ISE, RAI responses from the spent fuel pool instrumentation (SFPI) ISE, the licensee's integrated plans, and other audit questions.
The enclosed audit report provides a summary of the activities for the onsite audit portion.
Additionally, the staff gains a better understanding of submitted and updated information, audit information provided on ePortals, and preliminary Overall Program Documents/Final Integrated Plans while identifying additional information necessary for the licensee to supplement its plan and staff potential concerns.
Additionally, this report contains an attachment listing all open audit items currently under NRG staff review.
In support of the ongoing audit of the licensee's OIPs, as supplemented, the NRG staff conducted an onsite audit at NMP from November 3-7, 2014, per the audit plan dated October 8, 2014 (ADAMS Accession No. ML 14274A288).
 
The purpose of the onsite portion of the audit was to provide the NRG staff the opportunity to continue the audit review and gain key insights most easily obtained at the plant as to whether the licensee is on the correct path tor compliance with the Mitigation Strategies and SFPI orders. The onsite activities included detailed analysis and calculation discussion, walk-throughs of strategies and equipment laydown, visualization of portable equipment storage and deployment, staging and deployment of offsite equipment, and physical sizing and placement of SFPI equipment.
P. Orphanos                                 If you have any questions, please contact me at 301-415-5888 or by e-mail at Jason.paige@nrc.gov.
The enclosed audit report provides a summary of the activities for the onsite audit portion. Additionally, this report contains an attachment listing all open audit items currently under NRG staff review.
Jason Pai , Project Manager Orders Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket Nos.: 50-220 and 50-41 O
P. Orphanos If you have any questions, please contact me at 301-415-5888 or by e-mail at Jason.paige@nrc.gov.
Docket Nos.: 50-220 and 50-41 O  


==Enclosure:==
==Enclosure:==


Audit report cc w/encl: Distribution via Listserv Jason Pai , Project Manager Orders Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 AUDIT REPORT BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO ORDERS EA-12-049 AND EA-12-051 MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS AND RELIABLE SPENT FUEL POOL INSTRUMENTATION EXELON GENERATION, LLC NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 DOCKET NOS. 50-220 AND 50-410 BACKGROUND AND AUDIT BASIS On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRG) issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events" and Order EA-12-051, "Order to Modify Licenses With Regard To Reliable Spent Fuel Pool Instrumentation," (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML 12054A736 and ML 12054A679, respectively).
Audit report cc w/encl: Distribution via Listserv
The orders require holders of operating reactor licenses and construction permits issued under Title 10 of the Code of Federal Regulations Part 50 to submit for review, Overall Integrated Plans (OIPs) including descriptions of how compliance with the requirements of Attachment 2 of each order will be achieved.
 
By letter dated February 28, 2013 (ADAMS Accession No. ML 13066A 171 ), Exelon Generation, LLC, previously as Constellation Energy Nuclear Group, LLC (Exelon, the licensee) submitted its OIP for Nine Mile Point Nuclear Station, Units 1 and 2 (NMP1, NMP2), in response to Order EA-12-049.
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 AUDIT REPORT BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO ORDERS EA-12-049 AND EA-12-051 MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS AND RELIABLE SPENT FUEL POOL INSTRUMENTATION EXELON GENERATION, LLC NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 DOCKET NOS. 50-220 AND 50-410 BACKGROUND AND AUDIT BASIS On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRG) issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events" and Order EA-12-051, "Order to Modify Licenses With Regard To Reliable Spent Fuel Pool Instrumentation," (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML12054A736 and ML12054A679, respectively). The orders require holders of operating reactor licenses and construction permits issued under Title 10 of the Code of Federal Regulations Part 50 to submit for review, Overall Integrated Plans (OIPs) including descriptions of how compliance with the requirements of of each order will be achieved.
By letter dated March 8, 2013 (ADAMS Accession No. ML 13074A056), Exelon submitted a complete revision of the OIP for NMP. By letters dated August 27, 2013, February 27, 2014, August 26, 2014, February 19, 2015 (ADAMS Accession Nos. ML 13254A278, ML 14069A318, ML 14241 A380, and ML 15062A036, respectively), the licensee submitted its first four six-month updates to the OIP. By letter dated August 28, 2013 (ADAMS Accession No. ML 13234A503), the NRG notified all licensees and construction permit holders that the staff is conducting audits of their responses to Order EA-12-049 in accordance with NRG Office of Nuclear Reactor Regulation (NRR) Instruction LIC-111, "Regulatory Audits" (ADAMS Accession No. ML082900195).
By letter dated February 28, 2013 (ADAMS Accession No. ML13066A171 ), Exelon Generation, LLC, previously as Constellation Energy Nuclear Group, LLC (Exelon, the licensee) submitted its OIP for Nine Mile Point Nuclear Station, Units 1 and 2 (NMP1, NMP2), in response to Order EA-12-049. By letter dated March 8, 2013 (ADAMS Accession No. ML13074A056), Exelon submitted a complete revision of the OIP for NMP. By letters dated August 27, 2013, February 27, 2014, August 26, 2014, February 19, 2015 (ADAMS Accession Nos. ML13254A278, ML14069A318, ML14241A380, and ML15062A036, respectively), the licensee submitted its first four six-month updates to the OIP. By letter dated August 28, 2013 (ADAMS Accession No. ML13234A503), the NRG notified all licensees and construction permit holders that the staff is conducting audits of their responses to Order EA-12-049 in accordance with NRG Office of Nuclear Reactor Regulation (NRR) Instruction LIC-111, "Regulatory Audits" (ADAMS Accession No. ML082900195). This audit process led to the issuance of the NMP interim staff evaluation (ISE)(ADAMS Accession No. ML13225A584) and continues with in-office and onsite portions of this audit.
This audit process led to the issuance of the NMP interim staff evaluation (ISE)(ADAMS Accession No. ML 13225A584) and continues with in-office and onsite portions of this audit. Enclosure   By letter dated February 28, 2013 (ADAMS Accession No. ML 13066A 172), the licensee submitted its 01 P for NMP in response to Order EA-12-051.
Enclosure
By letter dated June 5, 2013 (ADAMS Accession No. ML 13154A399), the NRC staff sent a request for additional information (RAI) to the licensee.
 
By letters dated July 5, 2013, August 27, 2013, February 24, 2014, August 26, 2014, and February 19, 2015 (ADAMS Accession Nos. ML 13197A220, MU 3254A279, MU 4069A 180, MU 4241 A016, and MU 5062A035, respectively), the licensee submitted its RAI responses and first four six-month updates to the OIP. The NRC staff's review to date led to the issuance of the NMP ISE and RAI dated November 15, 2013 (ADAMS Accession No. ML 13281 A205). By letter dated March 26, 2014 (ADAMS Accession No. ML 14083A620), the NRC notified all licensees and construction permit holders that the staff is conducting in-office and onsite audits of their responses to Order EA-12-051 in accordance with NRC NRR Office Instruction LIC-111, as discussed above. The ongoing audits allow the staff to review open and confirmatory items from the mitigation strategies ISE, RAI responses from the spent fuel pool instrumentation (SFPI) ISE, the licensee's integrated plans, and other audit questions.
By letter dated February 28, 2013 (ADAMS Accession No. ML13066A172), the licensee submitted its 01 P for NMP in response to Order EA-12-051. By letter dated June 5, 2013 (ADAMS Accession No. ML13154A399), the NRC staff sent a request for additional information (RAI) to the licensee. By letters dated July 5, 2013, August 27, 2013, February 24, 2014, August 26, 2014, and February 19, 2015 (ADAMS Accession Nos. ML13197A220, MU 3254A279, MU 4069A 180, MU 4241 A016, and MU 5062A035, respectively), the licensee submitted its RAI responses and first four six-month updates to the OIP.
Additionally, the staff gains a better understanding of submitted and updated information, audit information provided on ePortals, and preliminary Overall Program Documents (OPDs)/Final Integrated Plans (FIPs) while identifying additional information necessary for the licensee to supplement its plan and staff potential concerns.
The NRC staff's review to date led to the issuance of the NMP ISE and RAI dated November 15, 2013 (ADAMS Accession No. ML13281A205). By letter dated March 26, 2014 (ADAMS Accession No. ML14083A620), the NRC notified all licensees and construction permit holders that the staff is conducting in-office and onsite audits of their responses to Order EA 051 in accordance with NRC NRR Office Instruction LIC-111, as discussed above.
In support of the ongoing audit of the licensee's OIPs, as supplemented, the NRC staff conducted an onsite audit at NMP from November 3-7, 2014, per the audit plan dated October 8, 2014 (ADAMS Accession No. ML 14274A288).
The ongoing audits allow the staff to review open and confirmatory items from the mitigation strategies ISE, RAI responses from the spent fuel pool instrumentation (SFPI) ISE, the licensee's integrated plans, and other audit questions. Additionally, the staff gains a better understanding of submitted and updated information, audit information provided on ePortals, and preliminary Overall Program Documents (OPDs)/Final Integrated Plans (FIPs) while identifying additional information necessary for the licensee to supplement its plan and staff potential concerns.
The purpose of the onsite portion of the audit was to provide the NRC staff the opportunity to continue the audit review and gain key insights most easily obtained at the plant as to whether the licensee is on the correct path for compliance with the Mitigation Strategies and SFPI orders. The onsite activities included detailed analysis and calculation discussion, walk-throughs of strategies and equipment laydown, visualization of portable equipment storage and deployment, staging and deployment of offsite equipment, and physical sizing and placement of SFPI equipment.
In support of the ongoing audit of the licensee's OIPs, as supplemented, the NRC staff conducted an onsite audit at NMP from November 3-7, 2014, per the audit plan dated October 8, 2014 (ADAMS Accession No. ML14274A288). The purpose of the onsite portion of the audit was to provide the NRC staff the opportunity to continue the audit review and gain key insights most easily obtained at the plant as to whether the licensee is on the correct path for compliance with the Mitigation Strategies and SFPI orders. The onsite activities included detailed analysis and calculation discussion, walk-throughs of strategies and equipment laydown, visualization of portable equipment storage and deployment, staging and deployment of offsite equipment, and physical sizing and placement of SFPI equipment.
Following the licensee's declarations of order compliance, the NRC staff will evaluate the OIPs, as supplemented, the resulting site-specific OPDs/FIPs, and, as appropriate, other licensee submittals based on the requirements in the orders. For Order EA-12-049, the staff will make a safety determination regarding order compliance using the Nuclear Energy Institute (NEI) guidance document NEI 12-06, "Diverse and Flexible Coping Strategies (FLEX) Implementation Guide" issued in August, 2012 (ADAMS Accession No. ML 12242A378), as endorsed, by NRC Japan Lessons-Learned Directorate (JLD) interim staff guidance (ISG) JLD-ISG-2012-01 "Compliance with Order EA-12-049, 'Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events"' (ADAMS Accession No. ML 12229A174) as providing one acceptable means of meeting the order requirements.
Following the licensee's declarations of order compliance, the NRC staff will evaluate the OIPs, as supplemented, the resulting site-specific OPDs/FIPs, and, as appropriate, other licensee submittals based on the requirements in the orders. For Order EA-12-049, the staff will make a safety determination regarding order compliance using the Nuclear Energy Institute (NEI) guidance document NEI 12-06, "Diverse and Flexible Coping Strategies (FLEX) Implementation Guide" issued in August, 2012 (ADAMS Accession No. ML12242A378), as endorsed, by NRC Japan Lessons-Learned Directorate (JLD) interim staff guidance (ISG) JLD-ISG-2012-01 "Compliance with Order EA-12-049, 'Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events"' (ADAMS Accession No. ML12229A174) as providing one acceptable means of meeting the order requirements. For Order EA-12-051, the staff will make a safety determination regarding order compliance using the NEI guidance document NEI 12-02, Revision 1, "Industry Guidance for Compliance with NRC Order EA-12-051, 'To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation"' (ADAMS Accession No. ML12240A307), as endorsed, with exceptions and clarifications, by NRC JLD-ISG-2012-03 "Compliance with Order EA-12-051, 'Reliable Spent
For Order EA-12-051, the staff will make a safety determination regarding order compliance using the NEI guidance document NEI 12-02, Revision 1, "Industry Guidance for Compliance with NRC Order EA-12-051, 'To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation"' (ADAMS Accession No. ML 12240A307), as endorsed, with exceptions and clarifications, by NRC JLD-ISG-2012-03 "Compliance with Order EA-12-051, 'Reliable Spent   Fuel Pool Instrumentation"' (ADAMS Accession No. ML 12221A339) as providing one acceptable means of meeting the order requirements.
 
Should the licensee propose an alternative strategy or other method deviating from the guidance, additional staff review will be required to evaluate if the alternative strategy complies with the applicable order. AUDIT ACTIVITIES The onsite audit was conducted at the NMP facility from November 3, 2014, through November 7, 2014. The NRC audit team staff was as follows: Title Team Member Team Lead/Project Manager Jason Paige Technical Support Michael Levine Technical Support Prem Sahay Technical Support Stephen Wyman Technical Support Brett Titus Technical Support Joshua Miller Branch Chief Stewart Bailey The NRC staff executed the onsite portion of the audit per the three part approach discussed in the October 8, 2014, plan, to include conducting a tabletop discussion of the site's integrated mitigating strategies compliance program, a review of specific technical review items, and discussion of specific program topics. Activities that were planned to support the above included detailed analysis and calculation discussions, walk-throughs of strategies and equipment laydown, visualization of portable equipment storage and deployment, staging and deployment of offsite equipment, and physical sizing and placement of SFPI equipment.
Fuel Pool Instrumentation"' (ADAMS Accession No. ML12221A339) as providing one acceptable means of meeting the order requirements. Should the licensee propose an alternative strategy or other method deviating from the guidance, additional staff review will be required to evaluate if the alternative strategy complies with the applicable order.
AUDIT ACTIVITIES The onsite audit was conducted at the NMP facility from November 3, 2014, through November 7, 2014. The NRC audit team staff was as follows:
Title                                       Team Member Team Lead/Project Manager                                   Jason Paige Technical Support                                 Michael Levine Technical Support                                   Prem Sahay Technical Support                                 Stephen Wyman Technical Support                                     Brett Titus Technical Support                                   Joshua Miller Branch Chief                                     Stewart Bailey The NRC staff executed the onsite portion of the audit per the three part approach discussed in the October 8, 2014, plan, to include conducting a tabletop discussion of the site's integrated mitigating strategies compliance program, a review of specific technical review items, and discussion of specific program topics. Activities that were planned to support the above included detailed analysis and calculation discussions, walk-throughs of strategies and equipment laydown, visualization of portable equipment storage and deployment, staging and deployment of offsite equipment, and physical sizing and placement of SFPI equipment.
AUDIT  
AUDIT  


==SUMMARY==
==SUMMARY==
NMP1 and NMP2 compliance dates for the orders are spring 2015 and spring 2016, respectively.
As communicated in the October 8, 2014, plan, NMP1 and NMP2 have two sets of questions due to the units having different strategies to mitigate an extended loss of alternating current power (ELAP) event. Therefore, the staff focused its onsite review on the NMP1 strategy, which is reflected in the summary below. However, Attachments 3 and 4 provide a status of NMP1 and NMP2 items that require additional information from the licensee and items that are still under NRC review. 1.0 Entrance Meeting (November 3, 2014) At the audit entrance meeting, the NRC staff audit team introduced itself followed by introductions from the licensee's staff. The NRC audit team provided a brief overview of the audit's objectives and anticipated schedule.
===2.0 Integrated===


Mitigating Strategies Compliance Program Overview Per the audit plan and as an introduction to the site's program, the licensee provided a presentation to the NRC audit team titled "Nine Mile Point Nuclear Station FLEX and   SFPLI [spent fuel pool level instrumentation]
NMP1 and NMP2 compliance dates for the orders are spring 2015 and spring 2016, respectively. As communicated in the October 8, 2014, plan, NMP1 and NMP2 have two sets of questions due to the units having different strategies to mitigate an extended loss of alternating current power (ELAP) event. Therefore, the staff focused its onsite review on the NMP1 strategy, which is reflected in the summary below. However, Attachments 3 and 4 provide a status of NMP1 and NMP2 items that require additional information from the licensee and items that are still under NRC review.
NRC Audit Orientation." The licensee provided an overview of its strategy to maintain core cooling, containment, and SFP cooling in the event of a beyond-design-basis external event (BDBEE), and the plant modifications being done in order to implement the strategies.
1.0    Entrance Meeting (November 3, 2014)
Also presented was the design and location of the FLEX equipment storage facility, the FLEX equipment that would be stored there, the interface with the National SAFER Response Center (NSRC), and the spent fuel pool level indication modification.
At the audit entrance meeting, the NRC staff audit team introduced itself followed by introductions from the licensee's staff. The NRC audit team provided a brief overview of the audit's objectives and anticipated schedule.
2.0    Integrated Mitigating Strategies Compliance Program Overview Per the audit plan and as an introduction to the site's program, the licensee provided a presentation to the NRC audit team titled "Nine Mile Point Nuclear Station FLEX and


===3.0 Onsite===
SFPLI [spent fuel pool level instrumentation] NRC Audit Orientation." The licensee provided an overview of its strategy to maintain core cooling, containment, and SFP cooling in the event of a beyond-design-basis external event (BDBEE), and the plant modifications being done in order to implement the strategies. Also presented was the design and location of the FLEX equipment storage facility, the FLEX equipment that would be stored there, the interface with the National SAFER Response Center (NSRC),
Audit Technical Discussion Topics Based on the audit plan, and with a particular emphasis on the Part 2 "Specific Technical Review Items," the NRC staff technical reviewers conducted interviews with licensee technical staff, site walk-downs, and detailed document review for the items listed in the plan. Results of these technical reviews that require additional information from the licensee or still under NRC review are documented in the audit item status tables in Attachments 3 and 4, as discussed in the Conclusion section below. 3.1 Reactor Systems Technical Discussions and Walk-Downs The NRC staff reviewed NMP1 modeling of an ELAP and its ability to mitigate the event, including the computer code used for the ELAP analysis and input parameters assumed to generate the results of the analysis.
and the spent fuel pool level indication modification.
Originally, the staff understood that the licensee would use the code Modular Accident Analysis Program (MAAP4) to perform its analysis of reactor coolant system (RCS) cooling and inventory control during an ELAP. However, in a 6-month update, the licensee stated that NMP1 is not intending to use the MAAP4 pathway, but will rely on the SAFE and SUPERHEX codes. These codes have not been reviewed for an ELAP condition.
3.0 Onsite Audit Technical Discussion Topics Based on the audit plan, and with a particular emphasis on the Part 2 "Specific Technical Review Items," the NRC staff technical reviewers conducted interviews with licensee technical staff, site walk-downs, and detailed document review for the items listed in the plan. Results of these technical reviews that require additional information from the licensee or still under NRC review are documented in the audit item status tables in Attachments 3 and 4, as discussed in the Conclusion section below.
Therefore, the staff is currently reviewing the licensee's use of the SAFE and SUPERHEX codes to analyze an ELAP condition at NMP1. 3.2 Electrical Technical Discussions and Walk-Downs The NRC staff reviewed the calculations on sizing for the FLEX diesel generators (DG), calculations on extending battery life based on load shedding, and walked down the switchgear, direct current (de) equipment, and battery rooms to evaluate strategies for hydrogen and temperature control. The NRC staff reviewed the licensee's NMP1 FLEX DG sizing calculation and verified that the total calculated power demand for the FLEX DGs is less than the generator rating of 563 kVA. In addition, the NRC staff reviewed the licensee's NMP1 load shed calculation.
3.1 Reactor Systems Technical Discussions and Walk-Downs The NRC staff reviewed NMP1 modeling of an ELAP and its ability to mitigate the event, including the computer code used for the ELAP analysis and input parameters assumed to generate the results of the analysis. Originally, the staff understood that the licensee would use the code Modular Accident Analysis Program (MAAP4) to perform its analysis of reactor coolant system (RCS) cooling and inventory control during an ELAP.
The licensee will begin the NMP1 load shed at the beginning of the ELAP event and will complete the shed within 30 minutes. The calculation determined that the maximum coping time would be approximately  
However, in a 6-month update, the licensee stated that NMP1 is not intending to use the MAAP4 pathway, but will rely on the SAFE and SUPERHEX codes. These codes have not been reviewed for an ELAP condition. Therefore, the staff is currently reviewing the licensee's use of the SAFE and SUPERHEX codes to analyze an ELAP condition at NMP1.
3.2 Electrical Technical Discussions and Walk-Downs The NRC staff reviewed the calculations on sizing for the FLEX diesel generators (DG),
calculations on extending battery life based on load shedding, and walked down the switchgear, direct current (de) equipment, and battery rooms to evaluate strategies for hydrogen and temperature control. The NRC staff reviewed the licensee's NMP1 FLEX DG sizing calculation and verified that the total calculated power demand for the FLEX DGs is less than the generator rating of 563 kVA. In addition, the NRC staff reviewed the licensee's NMP1 load shed calculation. The licensee will begin the NMP1 load shed at the beginning of the ELAP event and will complete the shed within 30 minutes. The calculation determined that the maximum coping time would be approximately 8.[[estimated NRC review hours::3 hours]] for the batteries upon load shed occurring within 30 minutes following the event. The licensee plans to deploy the FLEX DGs within [[estimated NRC review hours::2 hours]] of the event and energize the battery chargers in [[estimated NRC review hours::6 hours]] to repower the 125VDC loads.
During normal plant operation, the battery room ventilation is provided from the turbine building (TB) ventilation system. The battery room ventilation occurs by air flow being drawn through the battery door louvers and room air volume being discharged through


===8.3 hours===
the TB ventilation exhaust ducts located in the room. The TB ventilation is non safety-related and during an ELAP condition, this system is not functional. Therefore, during an ELAP, the hydrogen gas will accumulate in the ventilation duct, which is located above the battery rooms, while the batteries are being recharged. To prevent unacceptable hydrogen gas concentrations in the battery room ventilation ducts, 3 inch diameter holes are located on the top of the battery room exhaust ducts. The exhaust holes are normally closed by dampers and open during a loss of power. The exhaust holes will allow the hydrogen gas to escape from the duct into the TB atmosphere. Due to the immense volume of the TB, the hydrogen concentration will be extremely low (below 1 percent). This condition has been previously analyzed for loss of forced ventilation due to loss of offsite power in NMP Calculation S1 O-H2GAS-HV01, Revision 0 and disposition OOA. The NRC staff verified with the licensee that the damper controlling hole induct above the batteries fail open and will remain open to dissipate hydrogen to the TB.
for the batteries upon load shed occurring within 30 minutes following the event. The licensee plans to deploy the FLEX DGs within 2 hours of the event and energize the battery chargers in 6 hours to repower the 125VDC loads. During normal plant operation, the battery room ventilation is provided from the turbine building (TB) ventilation system. The battery room ventilation occurs by air flow being drawn through the battery door louvers and room air volume being discharged through  the TB ventilation exhaust ducts located in the room. The TB ventilation is non related and during an ELAP condition, this system is not functional.
3.3   SFPI Technical Discussions and Walk-Downs The NRC staff walked down the SFP area, SFPI locations, and related equipment mounting areas. No concerns were identified during the walk-downs.
Therefore, during an ELAP, the hydrogen gas will accumulate in the ventilation duct, which is located above the battery rooms, while the batteries are being recharged.
3.4    Other Technical Discussion Areas and Walk-Downs
To prevent unacceptable hydrogen gas concentrations in the battery room ventilation ducts, 3 inch diameter holes are located on the top of the battery room exhaust ducts. The exhaust holes are normally closed by dampers and open during a loss of power. The exhaust holes will allow the hydrogen gas to escape from the duct into the TB atmosphere.
: a. The NMP FLEX storage configuration consists of two storage buildings. One building will store N sets of FLEX equipment (N-building) and the second building (+ 1-building) will contain the additional + 1, set of FLEX equipment. The N-building is hardened against all BDBEEs and the + 1-building is hardened against all BDBEEs except for tornado winds/missiles.
Due to the immense volume of the TB, the hydrogen concentration will be extremely low (below 1 percent).
NRC staff identified that the NMP N-building I+ 1-building FLEX equipment storage configuration is not consistent with the tornado wind/missile hazard reasonable protection configurations described in the guidance contained in Section 7.3.1 of NEI 12-
This condition has been previously analyzed for loss of forced ventilation due to loss of offsite power in NMP Calculation S1 O-H2GAS-HV01, Revision 0 and disposition OOA. The NRC staff verified with the licensee that the damper controlling hole induct above the batteries fail open and will remain open to dissipate hydrogen to the TB. 3.3 SFPI Technical Discussions and Walk-Downs The NRC staff walked down the SFP area, SFPI locations, and related equipment mounting areas. No concerns were identified during the walk-downs.  
: 06. Section 7.3.1.1.a describes a configuration where FLEX equipment is reasonably protected in a structure designed to withstand the tornado wind/missile hazard. The+ 1 building is not hardened against tornado hazards and, therefore, does not meet the guidance contained in NEI 12-06, Section 7.3.1.1.a.
NEI 12-06, Sections 7.3.1.1.b and 7.3.1.1.c describe configurations where FLEX equipment is reasonably protected against tornado hazards by an adequate separation distance and orientation. The NRC position is that configuration 7.3.1.1.b and 7.3.1.1.c require N sets of equipment to be stored in each diverse location for a FLEX storage configuration that consists of only 2 locations. While the N-building and + 1-building are adequately separated, only one of the locations contains the full N set of FLEX equipment and, therefore, does not meet the guidance contained in NEI 12-06, Section 7.3.1.1.b or 7.3.1.1.c.


===3.4 Other===
NEI 12-06, Section 11.3.3 states the following:
Technical Discussion Areas and Walk-Downs
: a. The NMP FLEX storage configuration consists of two storage buildings.
One building will store N sets of FLEX equipment (N-building) and the second building ( + 1-building) will contain the additional
+ 1, set of FLEX equipment.
The N-building is hardened against all BDBEEs and the + 1-building is hardened against all BDBEEs except for tornado winds/missiles.
NRC staff identified that the NMP N-building I+ 1-building FLEX equipment storage configuration is not consistent with the tornado wind/missile hazard reasonable protection configurations described in the guidance contained in Section 7.3.1 of NEI 12-06. Section 7.3.1.1.a describes a configuration where FLEX equipment is reasonably protected in a structure designed to withstand the tornado wind/missile hazard. The+ 1 building is not hardened against tornado hazards and, therefore, does not meet the guidance contained in NEI 12-06, Section 7.3.1.1.a.
NEI 12-06, Sections 7.3.1.1.b and 7.3.1.1.c describe configurations where FLEX equipment is reasonably protected against tornado hazards by an adequate separation distance and orientation.
The NRC position is that configuration 7.3.1.1.b and 7.3.1.1.c require N sets of equipment to be stored in each diverse location for a FLEX storage configuration that consists of only 2 locations.
While the N-building and + 1-building are adequately separated, only one of the locations contains the full N set of FLEX equipment and, therefore, does not meet the guidance contained in NEI 12-06, Section 7.3.1.1.b or 7.3.1.1.c. NEI 12-06, Section 11.3.3 states the following:
FLEX mitigation equipment should be stored in a location or locations informed by evaluations performed per Sections 5 through 9 such that no one external event can reasonably fail the site FLEX capability (N).NEI Section 10.1, "Aggregation of FLEX Strategies," includes the following:
FLEX mitigation equipment should be stored in a location or locations informed by evaluations performed per Sections 5 through 9 such that no one external event can reasonably fail the site FLEX capability (N).NEI Section 10.1, "Aggregation of FLEX Strategies," includes the following:
Provision of at least N+ 1 sets of portable on-site equipment stored in diverse locations or in structures designed to reasonably protect from applicable BDBEEs is essential to provide reasonable assurance that N sets of FLEX equipment will remain deployable to assure success of the FLEX strategies.
Provision of at least N+ 1 sets of portable on-site equipment stored in diverse locations or in structures designed to reasonably protect from applicable BDBEEs is essential to provide reasonable assurance that N sets of FLEX equipment will remain deployable to assure success of the FLEX strategies.
Per the guidance above, it is essential to reasonably protect at least N+ 1 sets of FLEX equipment from all applicable BDBEEs to reasonably assure that N sets (FLEX capability, per section 11.3.3) will remain deployable after the BDBEE. When the reasonable protection scheme of either Section 7.3.1.1.b or 7.3.1.1.c.
Per the guidance above, it is essential to reasonably protect at least N+ 1 sets of FLEX equipment from all applicable BDBEEs to reasonably assure that N sets (FLEX capability, per section 11.3.3) will remain deployable after the BDBEE. When the reasonable protection scheme of either Section 7.3.1.1.b or 7.3.1.1.c. is utilized, 2 sets of N FLEX equipment must be located in the separate locations. The NMP FLEX equipment storage configuration does not meet the reasonable protection schemes of Section 7.3.1.1.b or 7.3.1.1.c since N sets of FLEX equipment are not contained in both locations. Also, as noted above, the NMP FLEX equipment storage configuration does not meet the reasonable protection scheme of Section 7.3.1.1.a since only N sets of FLEX equipment are stored in a robust structure that protects against all BDBEEs.
is utilized, 2 sets of N FLEX equipment must be located in the separate locations.
Therefore, the NMP FLEX equipment storage configuration does not meet the guidance contained in N El 12-06, Section 10.1, in that it only affords reasonable protection from all applicable BDBEEs for N sets of FLEX equipment, not N+ 1 sets, as stipulated in the NEI guidance as described above.
The NMP FLEX equipment storage configuration does not meet the reasonable protection schemes of Section 7.3.1.1.b or 7.3.1.1.c since N sets of FLEX equipment are not contained in both locations.
The NRC staff further identified that the NMP FLEX storage configuration would not support the maintenance and testing provisions contained in Section 11.5.3 of NEI 12-
Also, as noted above, the NMP FLEX equipment storage configuration does not meet the reasonable protection scheme of Section 7.3.1.1.a since only N sets of FLEX equipment are stored in a robust structure that protects against all BDBEEs. Therefore, the NMP FLEX equipment storage configuration does not meet the guidance contained in N El 12-06, Section 10.1, in that it only affords reasonable protection from all applicable BDBEEs for N sets of FLEX equipment, not N+ 1 sets, as stipulated in the NEI guidance as described above. The NRC staff further identified that the NMP FLEX storage configuration would not support the maintenance and testing provisions contained in Section 11.5.3 of NEI 12-06. Specifically, section 11.5.3.b states: Portable equipment may be unavailable for 90 days provided that the site FLEX capability (N) is available.
: 06. Specifically, section 11.5.3.b states:
Should an item of FLEX equipment be made unavailable in the N-building, the site FLEX capability (N) would no longer be available to mitigate a tornado related BDBEE. The corresponding + 1 item of FLEX equipment is not considered to be reasonably protected against the tornado hazard, and therefore, is not reasonably assured to be available or remain deployable to assure success of the FLEX strategies.
Portable equipment may be unavailable for 90 days provided that the site FLEX capability (N) is available.
The remaining available and deployable FLEX equipment, reasonably protected in the N-building, would be less than the site FLEX capability (N). Therefore, the NMP FLEX equipment storage configuration would not meet the condition included in NEI 12-06, Section 11.5.3.b (site Flex capability (N) is available) stipulated for the allowance of the 90-day portable equipment unavailability.
Should an item of FLEX equipment be made unavailable in the N-building, the site FLEX capability (N) would no longer be available to mitigate a tornado related BDBEE. The corresponding + 1 item of FLEX equipment is not considered to be reasonably protected against the tornado hazard, and therefore, is not reasonably assured to be available or remain deployable to assure success of the FLEX strategies. The remaining available and deployable FLEX equipment, reasonably protected in the N-building, would be less than the site FLEX capability (N). Therefore, the NMP FLEX equipment storage configuration would not meet the condition included in NEI 12-06, Section 11.5.3.b (site Flex capability (N) is available) stipulated for the allowance of the 90-day portable equipment unavailability.
The NRC staff communicated to the licensee that the NMP FLEX storage configuration is not consistent with guidance contained in NEI 12-06. Further consideration of the   NMP FLEX storage configuration by the NRG staff would require that the licensee propose the configuration as an alternative to the guidance of NEI 12-06, accompanied with appropriate justification.
The NRC staff communicated to the licensee that the NMP FLEX storage configuration is not consistent with guidance contained in NEI 12-06. Further consideration of the
Lastly, the NRG staff recognizes that the N-building is hardened against all BDBEEs and stores the required minimum set of FLEX equipment for NMP1 to mitigate an ELAP event; therefore, this issue is applicable once NMP2 must comply with the mitigating strategies (MS) order and is being tracked as a NMP2 item (see Attachment 3, NMP2 MS/SFPI safety evaluation (SE) Audit Items currently under NRG staff review and requiring licensee input as delineated).  
 
: b. The NRG staff reviewed the licensee's evaluation of the refueling floor SFP area for the possibility of steam and condensation during an ELAP event. The licensee provided calculation SO-GOTHIC-ELAP001 that concluded, by opening specific doors and vents within 3 hours, the maximum temperature would be 168 °F in the SFP area. Special Operating Procedure, N1-SOP-33A.2, "Station Blackout/ELAP", Section 5.6, directs that some of the subject doors will be breached when the hoses are initially laid (within approximately 1 hour) while other doors and vents will be opened by or before 8 hours. Figure 1 B shows that the difference between opening the doors at 1 hour, 3 hours, or not at all causes a variance of only 5 degrees °F at the 8-hour mark, so the opening of the doors is not time critical, and the verbiage of the procedure is sufficient.
NMP FLEX storage configuration by the NRG staff would require that the licensee propose the configuration as an alternative to the guidance of NEI 12-06, accompanied with appropriate justification. Lastly, the NRG staff recognizes that the N-building is hardened against all BDBEEs and stores the required minimum set of FLEX equipment for NMP1 to mitigate an ELAP event; therefore, this issue is applicable once NMP2 must comply with the mitigating strategies (MS) order and is being tracked as a NMP2 item (see Attachment 3, NMP2 MS/SFPI safety evaluation (SE) Audit Items currently under NRG staff review and requiring licensee input as delineated).
The licensee identified this lack of sensitivity to the timing of the door opening on page 28 of the SO-GOTHIC-ELAP001 calculation stating, "The impact of the time to open the door has essentially no impact on the temperature transient." c. The NRG staff reviewed the licensee's FLEX equipment hydraulic analysis; Calculation SO-FLEX-F001, "NMP1 FLEX Hydraulic Flow Evaluation." The staff's review focused on the FLEX flow path characteristics including net positive suction head available, friction and elevation head losses, and pressures and flow rates required for injection and whether the FLEX pumps have the capability to meet these requirements.
: b. The NRG staff reviewed the licensee's evaluation of the refueling floor SFP area for the possibility of steam and condensation during an ELAP event. The licensee provided calculation SO-GOTHIC-ELAP001 that concluded, by opening specific doors and vents within [[estimated NRC review hours::3 hours]], the maximum temperature would be 168 °F in the SFP area. Special Operating Procedure, N1-SOP-33A.2, "Station Blackout/ELAP", Section 5.6, directs that some of the subject doors will be breached when the hoses are initially laid (within approximately 1 hour) while other doors and vents will be opened by or before [[estimated NRC review hours::8 hours]].
The staff questioned the licensee's ability to inject into the reactor pressure vessel (RPV) following the isolation of one of the emergency condensers (ECs), as the resulting RPV pressure increase is above that required for injection.
Figure 1B shows that the difference between opening the doors at 1 hour, [[estimated NRC review hours::3 hours]], or not at all causes a variance of only 5 degrees °F at the 8-hour mark, so the opening of the doors is not time critical, and the verbiage of the procedure is sufficient. The licensee identified this lack of sensitivity to the timing of the door opening on page 28 of the SO-GOTHIC-ELAP001 calculation stating, "The impact of the time to open the door has essentially no impact on the temperature transient."
The licensee stated that procedures will be revised to direct operators to maintain RPV pressure below the limit required for FLEX injection using the emergency relief valves. In addition, the staff reviewed the flow and pressure requirements for core cooling, containment, and SFP cooling and whether the pumps supplied by the NSRC are capable of meeting those requirements.
: c. The NRG staff reviewed the licensee's FLEX equipment hydraulic analysis; Calculation SO-FLEX-F001, "NMP1 FLEX Hydraulic Flow Evaluation." The staff's review focused on the FLEX flow path characteristics including net positive suction head available, friction and elevation head losses, and pressures and flow rates required for injection and whether the FLEX pumps have the capability to meet these requirements. The staff questioned the licensee's ability to inject into the reactor pressure vessel (RPV) following the isolation of one of the emergency condensers (ECs), as the resulting RPV pressure increase is above that required for injection. The licensee stated that procedures will be revised to direct operators to maintain RPV pressure below the limit required for FLEX injection using the emergency relief valves.
The staff reviewed the licensee's calculation (SO-FLEX-F001) and compared the flow and pressure values to the pump capacities listed in the NSRC Equipment Technical Requirements, AREVA document 51-919971-012. d. The NRG staff reviewed the licensee's plan for sharing facility resources between units. The staff's review focused on the identification of any shared resources and the management of those resources during an ELAP event. The licensee stated that the two units will share FLEX resources for debris removal, towing, refueling, FLEX storage, and offsite communications.
In addition, the staff reviewed the flow and pressure requirements for core cooling, containment, and SFP cooling and whether the pumps supplied by the NSRC are capable of meeting those requirements. The staff reviewed the licensee's calculation (SO-FLEX-F001) and compared the flow and pressure values to the pump capacities listed in the NSRC Equipment Technical Requirements, AREVA document 51-919971-012.
The licensee stated that deployment strategies include expected priority for equipment.
: d. The NRG staff reviewed the licensee's plan for sharing facility resources between units.
The licensee no longer plans to share the dry hydrants   from one unit to the other. The licensee stated that dry hydrants are no longer planned for NMP1 and that the dry hydrant design for NMP2 is not presently expected to be sized to accommodate the combined flow for NMP1 and NMP2. e. The NRC staff reviewed the licensee's evaluation of the accessibility and survivability of equipment housed in the TB following a BDBEE. For example, the licensee's strategy requires operators to respond and control level in the ECs by throttling manual valves in the TB. The licensee stated that although the TB is a Class II structure, for seismic design, the entire TB complex was evaluated as a Class I structure and is designed to withstand the same peak ground acceleration as the reactor building, a Class I structure.
The staff's review focused on the identification of any shared resources and the management of those resources during an ELAP event. The licensee stated that the two units will share FLEX resources for debris removal, towing, refueling, FLEX storage, and offsite communications. The licensee stated that deployment strategies include expected priority for equipment. The licensee no longer plans to share the dry hydrants
4.0 Exit Meeting (November 7, 2014) The NRC staff audit team conducted an exit meeting with the licensee staff following the closure of onsite audit activities.
 
The NRC staff highlighted items reviewed and noted that the results of the onsite audit trip will be documented in this report. The following items that require additional information from the licensee or still under NRC review were discussed at the exit meeting (see Attachments 3 and 4 for additional information):  
from one unit to the other. The licensee stated that dry hydrants are no longer planned for NMP1 and that the dry hydrant design for NMP2 is not presently expected to be sized to accommodate the combined flow for NMP1 and NMP2.
: a. ISE Cl 3.2.1.2.A, Recirculation System Leakage The staff requested that the licensee provide justification of the pressure dependence of the assumed recirculation system leakage rates and the recirculation pump seal leakage rates that were used in the ELAP analysis, whether the leakage was determined to be single-phase, two-phase, or steam at the donor cell, and how mixing of the leakage flow with the drywell atmosphere was modeled. The licensee provided calculations ET-S-331, "Testing of the CAN2A Seal Cartridge Under Station Blackout Conditions," and ET-S-426, "Testing of the CAN2A Seal Cartridge Under Station Blackout Conditions  
: e. The NRC staff reviewed the licensee's evaluation of the accessibility and survivability of equipment housed in the TB following a BDBEE. For example, the licensee's strategy requires operators to respond and control level in the ECs by throttling manual valves in the TB. The licensee stated that although the TB is a Class II structure, for seismic design, the entire TB complex was evaluated as a Class I structure and is designed to withstand the same peak ground acceleration as the reactor building, a Class I structure.
-Phase 2," for justification of the seal leakage rates under station blackout conditions.
4.0     Exit Meeting (November 7, 2014)
The staff is currently reviewing the calculations.  
The NRC staff audit team conducted an exit meeting with the licensee staff following the closure of onsite audit activities. The NRC staff highlighted items reviewed and noted that the results of the onsite audit trip will be documented in this report. The following items that require additional information from the licensee or still under NRC review were discussed at the exit meeting (see Attachments 3 and 4 for additional information):
: b. ISE Cl 3.2.4.2.B and SE Review Item 7, Battery Board and Charger Rooms Ventilation While the NRC staff was reviewing the licensee's evaluation of the ventilation provided in the battery room, the staff requested that the licensee provide an evaluation on the ventilation in the battery board and charger rooms to protect against the effects of extreme temperatures.
: a. ISE Cl 3.2.1.2.A, Recirculation System Leakage The staff requested that the licensee provide justification of the pressure dependence of the assumed recirculation system leakage rates and the recirculation pump seal leakage rates that were used in the ELAP analysis, whether the leakage was determined to be single-phase, two-phase, or steam at the donor cell, and how mixing of the leakage flow with the drywell atmosphere was modeled. The licensee provided calculations ET-S-331, "Testing of the CAN2A Seal Cartridge Under Station Blackout Conditions," and ET-S-426, "Testing of the CAN2A Seal Cartridge Under Station Blackout Conditions - Phase 2," for justification of the seal leakage rates under station blackout conditions. The staff is currently reviewing the calculations.
The licensee provided NMP1 calculation S 1 O-HVAC-HV05, Rev. 2, "Battery Board Room Low temperature." The NRC staff reviewed and discussed this calculation with the licensee and identified that for low temperatures in the battery board room, this calculation recommended interim actions to be taken if the temperature in the room dips below a certain level. However, these interim actions were not defined in the calculation.
: b. ISE Cl 3.2.4.2.B and SE Review Item 7, Battery Board and Charger Rooms Ventilation While the NRC staff was reviewing the licensee's evaluation of the ventilation provided in the battery room, the staff requested that the licensee provide an evaluation on the ventilation in the battery board and charger rooms to protect against the effects of extreme temperatures. The licensee provided NMP1 calculation S 1O-HVAC-HV05, Rev. 2, "Battery Board Room Low temperature." The NRC staff reviewed and discussed this calculation with the licensee and identified that for low temperatures in the battery board room, this calculation recommended interim actions to be taken if the temperature in the room dips below a certain level.
After the onsite audit, the licensee provided a revised calculation.
However, these interim actions were not defined in the calculation. After the onsite audit, the licensee provided a revised calculation. In addition, the licensee provided its evaluation of the ventilation in the battery charger room. The NRC staff is currently reviewing the calculations.
In addition, the licensee provided its evaluation of the ventilation in the battery charger room. The NRC staff is currently reviewing the calculations.  
: c. AQ 13, Analytical Code(s) to Predict ELAP Timeline The NRC staff requested that the licensee provide NMP1 analytical results to support the conclusions that the predictions of the code(s) used are consistent with expected
: c. AQ 13, Analytical Code(s) to Predict ELAP Timeline The NRC staff requested that the licensee provide NMP1 analytical results to support the conclusions that the predictions of the code(s) used are consistent with expected   plant behavior and that core cooling would be maintained by performing the identified actions within their time constraints.
 
The licensee provided NMP1 SAFE and SUPERHEX calculations to demonstrate that adequate core cooling is maintained during an ELAP event. The staff is currently reviewing the SAFE and SUPERHEX calculations.  
plant behavior and that core cooling would be maintained by performing the identified actions within their time constraints. The licensee provided NMP1 SAFE and SUPERHEX calculations to demonstrate that adequate core cooling is maintained during an ELAP event. The staff is currently reviewing the SAFE and SUPERHEX calculations.
: d. SE Review Item 4, Raw Water Sources The NRG staff requested that the licensee address the use of raw water sources for core cooling to mitigate an ELAP event and the potential for fuel channel inlet blockage.
: d. SE Review Item 4, Raw Water Sources The NRG staff requested that the licensee address the use of raw water sources for core cooling to mitigate an ELAP event and the potential for fuel channel inlet blockage. Specifically, the NRG staff discussed with the licensee that if raw water is used for core cooling (even if it is filtered), the licensee should provide assurance of top-down cooling, where rising steam may have the capability to dislodge blockage across channel outlets which typically have more open area and larger openings than channel inlets. After the onsite audit, the licensee provided a position paper to justify using raw water sources. The NRG staff is currently reviewing the position paper.
Specifically, the NRG staff discussed with the licensee that if raw water is used for core cooling (even if it is filtered), the licensee should provide assurance of top-down cooling, where rising steam may have the capability to dislodge blockage across channel outlets which typically have more open area and larger openings than channel inlets. After the onsite audit, the licensee provided a position paper to justify using raw water sources. The NRG staff is currently reviewing the position paper. e. SE Review Item 5, Human Factors During the onsite audit, the NRG staff verified that appropriate human factors are being applied for the implementation of the NMP1 FLEX strategies.
: e. SE Review Item 5, Human Factors During the onsite audit, the NRG staff verified that appropriate human factors are being applied for the implementation of the NMP1 FLEX strategies. As a follow-up item from discussions, the NRG staff requested that the licensee provide the validation for the timing of the staging and setup of the NMP1 FLEX RCS injection pump. After the onsite audit, the licensee provided the NMP1 FLEX pump deployment validation. The NRG staff is currently reviewing the validation.
As a follow-up item from discussions, the NRG staff requested that the licensee provide the validation for the timing of the staging and setup of the NMP1 FLEX RCS injection pump. After the onsite audit, the licensee provided the NMP1 FLEX pump deployment validation.
CONCLUSION The NRG staff completed all three parts of the October 8, 2014, onsite audit plan. Each audit item listed in Part 2 of the plan was reviewed by NRG staff members while on site. In addition to the list of NRG and licensee onsite audit staff participants in Attachment 1, Attachment 2 provides a list of documents reviewed during the onsite audit portion.
The NRG staff is currently reviewing the validation.
In support of the continuing audit process as the licensee proceeds towards orders compliance for this site, Attachments 3 and 4 provide the status of all open audit review items that the NRG staff is evaluating in anticipation of issuance of a combined SE for both the Mitigation Strategies and Spent Fuel Pool Level Instrumentation orders. The five sources for the audit items referenced below are as follows:
CONCLUSION The NRG staff completed all three parts of the October 8, 2014, onsite audit plan. Each audit item listed in Part 2 of the plan was reviewed by NRG staff members while on site. In addition to the list of NRG and licensee onsite audit staff participants in Attachment 1, Attachment 2 provides a list of documents reviewed during the onsite audit portion. In support of the continuing audit process as the licensee proceeds towards orders compliance for this site, Attachments 3 and 4 provide the status of all open audit review items that the NRG staff is evaluating in anticipation of issuance of a combined SE for both the Mitigation Strategies and Spent Fuel Pool Level Instrumentation orders. The five sources for the audit items referenced below are as follows: a. Interim Staff Evaluation (ISE) Open Items (Ols) and Confirmatory Items (Cls) b. Audit Questions (AQs) c. Licensee-identified Overall Integrated Plan (OIP) Open Items (Ols) d. Spent Fuel Pool Level Instrumentation (SFPLI) Requests for Additional Information (RAls) e. Additional SE needed information   The attachments provide audit information as follows: a. Attachment 1: List of NRG staff and licensee staff audit participants  
: a.       Interim Staff Evaluation (ISE) Open Items (Ols) and Confirmatory Items (Cls)
: b. Attachment 2: List of documents reviewed during the onsite audit c. Attachment 3: NMP1 and NMP2 MS/SFPI SE Audit Items currently under NRG staff review and requiring licensee input as delineated  
: b.       Audit Questions (AQs)
: d. Attachment 4: NMP1 and NMP2 MS/SFPI SE Audit Items currently under NRG staff review but not requiring further licensee input While this report notes the completion of the onsite portion of the audit per the audit plan dated October 8, 2014, the ongoing audit process continues as per the letters dated August 28, 2013, and March 26, 2014, to all licensees and construction permit holders for both orders. Additionally, while Attachments 3 and 4 provide a progress snapshot of the NRG staff's review of the licensee's OIPs, as supplemented, and as augmented in the audit process, the status and progress of the NRG staff's review may change based on licensee plan changes, resolution of generic issues, and other NRG staff concerns not previously documented.
: c.       Licensee-identified Overall Integrated Plan (OIP) Open Items (Ols)
Changes in the NRG staff review will be communicated in the ongoing audit process. Lastly, the licensee has identified open items that need to be completed to implement orders EA-12-049 and EA-12-051, and the staff expects that the licensee continue to provide updates on the status of the licensee identified open items in their 6-month updates or on the e-Portal.
: d.       Spent Fuel Pool Level Instrumentation (SFPLI) Requests for Additional Information (RAls)
Attachments:  
: e.       Additional SE needed information
: 1. NRG and Licensee Staff Onsite Audit Participants  
 
: 2. Onsite Audit Documents Reviewed 3. NMP1 and NMP2 MS/SFPI SE Audit Items currently under NRG staff review and requiring licensee input 4. NMP1 and NMP2 MS/SFPI SE Audit Items currently under NRG staff review but not requiring further licensee input NRC Staff: Jason Paige Michael Levine Prem Sahay Stephen Wyman NMP Staff: Gregg Pitts Terry Syrell Brandon Varga Peter Orphanos Kathy Picciott Michael Conway Phil Amway Barry Thurston Josh Rocks George Wrobel Carol Kranich Todd Fiorenza Onsite Audit Participants NRR/JLD/JOMB Brett Titus NRR/JLD/JCBB Joshua Miller NRR/JLD/JERB Stewart Bailey NRR/JLD/JERB Fukushima Project Manager, Regulatory Assurance Regulatory Assurance Site Vice President Site Fukushima Project Lead Fukushima Project NRR/JLD/JCBB NRR/JLD/JERB NRR/JLD/JCBB Corporate Severe Accident Management Group Corporate Severe Accident Management Group Design Engineering Ginna Site Fukushima Project Lead Manager, Site Nuclear Oversight Manager, Site Project Management Attachment 1
The attachments provide audit information as follows:
: a.       Attachment 1: List of NRG staff and licensee staff audit participants
: b.       Attachment 2: List of documents reviewed during the onsite audit
: c.       Attachment 3: NMP1 and NMP2 MS/SFPI SE Audit Items currently under NRG staff review and requiring licensee input as delineated
: d.       Attachment 4: NMP1 and NMP2 MS/SFPI SE Audit Items currently under NRG staff review but not requiring further licensee input While this report notes the completion of the onsite portion of the audit per the audit plan dated October 8, 2014, the ongoing audit process continues as per the letters dated August 28, 2013, and March 26, 2014, to all licensees and construction permit holders for both orders.
Additionally, while Attachments 3 and 4 provide a progress snapshot of the NRG staff's review of the licensee's OIPs, as supplemented, and as augmented in the audit process, the status and progress of the NRG staff's review may change based on licensee plan changes, resolution of generic issues, and other NRG staff concerns not previously documented. Changes in the NRG staff review will be communicated in the ongoing audit process.
Lastly, the licensee has identified open items that need to be completed to implement orders EA-12-049 and EA-12-051, and the staff expects that the licensee continue to provide updates on the status of the licensee identified open items in their 6-month updates or on the e-Portal.
Attachments:
: 1. NRG and Licensee Staff Onsite Audit Participants
: 2. Onsite Audit Documents Reviewed
: 3. NMP1 and NMP2 MS/SFPI SE Audit Items currently under NRG staff review and requiring licensee input
: 4. NMP1 and NMP2 MS/SFPI SE Audit Items currently under NRG staff review but not requiring further licensee input
 
Onsite Audit Participants NRC Staff:
Jason Paige         NRR/JLD/JOMB              Brett Titus      NRR/JLD/JCBB Michael Levine       NRR/JLD/JCBB              Joshua Miller    NRR/JLD/JERB Prem Sahay           NRR/JLD/JERB              Stewart Bailey    NRR/JLD/JCBB Stephen Wyman       NRR/JLD/JERB NMP Staff:
Gregg Pitts               Fukushima Project Terry Syrell             Manager, Regulatory Assurance Brandon Varga             Regulatory Assurance Peter Orphanos           Site Vice President Kathy Picciott           Site Fukushima Project Lead Michael Conway           Fukushima Project Phil Amway               Corporate Severe Accident Management Group Barry Thurston           Corporate Severe Accident Management Group Josh Rocks               Design Engineering George Wrobel             Ginna Site Fukushima Project Lead Carol Kranich             Manager, Site Nuclear Oversight Todd Fiorenza            Manager, Site Project Management Attachment 1
 
Documents Reviewed
Documents Reviewed
* Calculation ET-S-331, Testing of the CAN2A Seal Cartridge Under Station Blackout Conditions
* Calculation ET-S-331, Testing of the CAN2A Seal Cartridge Under Station Blackout Conditions
* Calculation ET-S-426, Testing of the CAN2A Seal Cartridge Under Station Blackout Conditions  
* Calculation ET-S-426, Testing of the CAN2A Seal Cartridge Under Station Blackout Conditions - Phase 2
-Phase 2
* Calculation SO-GOTHIC-ELAP001
* Calculation SO-GOTHIC-ELAP001
* Calculation SO-GOTHIC-ELAP002, Primary Containment Response Following An Extended Loss of AC Power, Revision O
* Calculation SO-GOTHIC-ELAP002, Primary Containment Response Following An Extended Loss of AC Power, Revision O
Line 138: Line 145:
* Calculation S 10-HVAC-HVOS, Battery Board Room Low temperature, Revision 2
* Calculation S 10-HVAC-HVOS, Battery Board Room Low temperature, Revision 2
* Calculation S10-21OHV12-02
* Calculation S10-21OHV12-02
* Calculation 600VACDGES-FLEX-BDB, Fukushima 600VAC FLEX-BDB-450KW /563KVA, Revision O
* Calculation 600VACDGES-FLEX-BDB, Fukushima 600VAC FLEX-BDB-450KW/563KVA, Revision O
* Calculation 125DCTRAIN11/12LFVD, 125VDC Power System 11 and 12 Load Flow Voltage Drop
* Calculation 125DCTRAIN11/12LFVD, 125VDC Power System 11 and 12 Load Flow Voltage Drop
* Procedure OP-NM-102-106, Load Stripping, Revision O
* Procedure OP-NM-102-106, Load Stripping, Revision O
Line 146: Line 153:
* Analysis ECP-13-000651-MU-009 SO-GOTHIC-ELAP001-N/A
* Analysis ECP-13-000651-MU-009 SO-GOTHIC-ELAP001-N/A
* Drawing C-23321-C Sheet 1 Attachment 2
* Drawing C-23321-C Sheet 1 Attachment 2
NMP1 Mitigation Strategies/Spent Fuel Pool Instrumentation Safety Evaluation Audit Items: Audit Items Currently Under NRC Staff Review And Requiring licensee Input Audit Item Item Description licensee Input Needed Reference Make available for review verification that the NMP1 maintenance and testing program for the FLEX equipment include (but not limited to) the SE Review Item 8 Maintenance and Testing acceptance and replacement criteria for electrical equipment (i.e., FLEX DGs, batteries, cables etc.). In addition, provide the shelf life of components (i.e., 0-rinas, seals, battery life etc.). Attachment 3
 
NMP2 Mitigation Strategies/Spent Fuel Pool Instrumentation Safety Evaluation Audit Items: Audit Items Currently Under NRC Staff Review And Requiring Licensee Input Audit Item Item Description Licensee Input Needed Reference Make available for review a calculation to ISE 01 3.2.3.B Containment Functions demonstrate that the assumed timeline is appropriate and that containment functions will be restored and maintained following an ELAP event. Make available for review a proposal that the FLEX ISE Cl 3.1.1.1.A FLEX Storage Building storage building configuration is an alternative to the guidance of NEI 12-06, accompanied with appropriate justification.
NMP1 Mitigation Strategies/Spent Fuel Pool Instrumentation Safety Evaluation Audit Items:
Make available for review the NMP2 deployment ISE Cl 3.1.1.2.A Deployment Routes routes and any considerations for possible impacts due to debris and soil liquefaction.
Audit Items Currently Under NRC Staff Review And Requiring licensee Input Audit Item Item Description                                     licensee Input Needed Reference Make available for review verification that the NMP1 maintenance and testing program for the FLEX equipment include (but not limited to) the SE Review Item 8   Maintenance and Testing                             acceptance and replacement criteria for electrical equipment (i.e., FLEX DGs, batteries, cables etc.).
ISE Cl 3.2.1.1.A ISE Cl 3.2.1.1.B Make available for review the modular accident ISE Cl 3.2.1.1.C Analytical Code to Predict ELAP Event analysis program (MAAP) calculation once ISE Cl 3.2.1.1.D completed.
In addition, provide the shelf life of components (i.e., 0-rinas, seals, battery life etc.).
ISE Cl 3.2.1.1.E Make available for review the recirculation pump ISE Cl 3.2.1.2.A Recirculation System Leakage model and seal model as well as the maximum possible seal leakage and the seal leakage used to model the event. Make available for review an evaluation of the ISE Cl 3.2.2.A Ventilation potential of steam and condensation in the refueling floor SFP area.
Attachment 3
Audit Item Item Description Licensee Input Needed Reference Make available for review an evaluation of containment structures to identify necessary actions to enable implementation of the strategy with ISE Cl 3.2.3.A running RCIC [reactor core isolation cooling] pumps ISE Cl 3.2.4.2.A Ventilation with elevated temperatures.
 
In addition, provide an SE Review Item 5 evaluation of the ventilation in the battery charger rooms to protect electrical equipment from the effects of high or low temperatures during an ELAP event. ISE Cl 3.4.B Make available for review the hydraulic analysis for AO 16 Hydraulic Analysis AO 17 the NMP2 FLEX equipment.
NMP2 Mitigation Strategies/Spent Fuel Pool Instrumentation Safety Evaluation Audit Items:
AO 1 Describe how FLEX equipment will be protected A02 Protection of Equipment and Connection Points and how connection points will be accessed during a seismic event. Identify and make available for review a list of FLEX SE Review Item 1 Instrumentation instrumentations that will be used to monitor FLEX electrical equipment.
Audit Items Currently Under NRC Staff Review And Requiring Licensee Input Audit Item Item Description                                     Licensee Input Needed Reference Make available for review a calculation to demonstrate that the assumed timeline is ISE 01 3.2.3.B     Containment Functions appropriate and that containment functions will be restored and maintained following an ELAP event.
Make available for review verification that the NMP2 maintenance and testing program for the FLEX equipment include (but not limited to) the SE Review Item 6 Maintenance and Testing acceptance and replacement criteria for electrical equipment (i.e., FLEX DGs, batteries, cables etc.). In addition, provide the shelf life of components (i.e., 0-rings, seals, battery life etc.). The NRC staff review did not find load shed coping time, sizing and load profile analyses for battery ISE Cl 3.2.4.1 O.A Battery Coping Times 2BYS*BAT2B in Calculation EC-203, Battery 2BYS*BAT2A and 2BYS*BAT2B, Revision 0. Make available for review the sizing, load profile and load shed copinq analyses for battery 2BYS*BAT2B.
Make available for review a proposal that the FLEX storage building configuration is an alternative to ISE Cl 3.1.1.1.A   FLEX Storage Building the guidance of NEI 12-06, accompanied with appropriate justification.
NMP1 Mitigation Strategies/Spent Fuel Pool Instrumentation Safety Evaluation Audit Items: Audit Items Currently Under NRC Staff Review But Not Requiring Further Licensee Input Audit Item Item Description Action Reference The staff requested that the licensee provide justification of the pressure dependence of the assumed recirculation system leakage rates and the recirculation pump seal leakage rates that were used in the ELAP analysis, whether the leakage was determined to be single-phase, two-phase, or steam at the donor cell, and how mixing of the ISE Cl 3.2.1.2.A Recirculation System Leakage leakage flow with the drywell atmosphere was modeled. The licensee provided calculations ET-S-331, "Testing of the CAN2A Seal Cartridge Under Station Blackout Conditions," and ET-S-426, "Testing of the CAN2A Seal Cartridge Under Station Blackout Conditions  
Make available for review the NMP2 deployment ISE Cl 3.1.1.2.A   Deployment Routes                                   routes and any considerations for possible impacts due to debris and soil liquefaction.
-Phase 2," for justification of the seal leakage rates under station blackout conditions.
ISE Cl 3.2.1.1.A ISE Cl 3.2.1.1.B                                                         Make available for review the modular accident ISE Cl 3.2.1.1.C   Analytical Code to Predict ELAP Event               analysis program (MAAP) calculation once ISE Cl 3.2.1.1.D                                                         completed.
The staff is currently reviewing the calculations.
ISE Cl 3.2.1.1.E Make available for review the recirculation pump model and seal model as well as the maximum ISE Cl 3.2.1.2.A   Recirculation System Leakage possible seal leakage and the seal leakage used to model the event.
Make available for review an evaluation of the ISE Cl 3.2.2.A     Ventilation                                           potential of steam and condensation in the refueling floor SFP area.
 
Audit Item Item Description                             Licensee Input Needed Reference Make available for review an evaluation of containment structures to identify necessary actions to enable implementation of the strategy with ISE Cl 3.2.3.A                                                   running RCIC [reactor core isolation cooling] pumps ISE Cl 3.2.4.2.A   Ventilation                                   with elevated temperatures. In addition, provide an SE Review Item 5                                                 evaluation of the ventilation in the battery charger rooms to protect electrical equipment from the effects of high or low temperatures during an ELAP event.
ISE Cl 3.4.B Make available for review the hydraulic analysis for AO 16             Hydraulic Analysis the NMP2 FLEX equipment.
AO 17 Describe how FLEX equipment will be protected AO 1 Protection of Equipment and Connection Points and how connection points will be accessed during A02 a seismic event.
Identify and make available for review a list of FLEX SE Review Item 1   Instrumentation                               instrumentations that will be used to monitor FLEX electrical equipment.
Make available for review verification that the NMP2 maintenance and testing program for the FLEX equipment include (but not limited to) the SE Review Item 6   Maintenance and Testing                       acceptance and replacement criteria for electrical equipment (i.e., FLEX DGs, batteries, cables etc.).
In addition, provide the shelf life of components (i.e., 0-rings, seals, battery life etc.).
The NRC staff review did not find load shed coping time, sizing and load profile analyses for battery 2BYS*BAT2B in Calculation EC-203, Battery ISE Cl 3.2.4.1 O.A Battery Coping Times 2BYS*BAT2A and 2BYS*BAT2B, Revision 0. Make available for review the sizing, load profile and load shed copinq analyses for battery 2BYS*BAT2B.
 
NMP1 Mitigation Strategies/Spent Fuel Pool Instrumentation Safety Evaluation Audit Items:
Audit Items Currently Under NRC Staff Review But Not Requiring Further Licensee Input Audit Item Item Description                                     Action Reference The staff requested that the licensee provide justification of the pressure dependence of the assumed recirculation system leakage rates and the recirculation pump seal leakage rates that were used in the ELAP analysis, whether the leakage was determined to be single-phase, two-phase, or steam at the donor cell, and how mixing of the leakage flow with the drywell atmosphere was ISE Cl 3.2.1.2.A   Recirculation System Leakage modeled. The licensee provided calculations ET-S-331, "Testing of the CAN2A Seal Cartridge Under Station Blackout Conditions," and ET-S-426, "Testing of the CAN2A Seal Cartridge Under Station Blackout Conditions - Phase 2," for justification of the seal leakage rates under station blackout conditions. The staff is currently reviewing the calculations.
Attachment 4
Attachment 4
Audit Item Item Description Action Reference While the NRC staff was reviewing the licensee's evaluation of the ventilation provided in the battery room, the staff requested that the licensee provide an evaluation on the ventilation in the battery board and charger rooms to protect against the effects of extreme temperatures.
 
The licensee provided NMP1 calculation S10-HVAC-HVOS, Rev. 2, "Battery Board Room Low temperature." The NRC ISE Cl 3.2.4.2.B staff reviewed and discussed this calculation with SE Review Item 7 Battery Board and Charger Rooms Ventilation the licensee and identified that for low temperatures in the battery board room, this calculation recommended interim actions to be taken if the temperature in the room dips below a certain level. However, these interim actions were not defined in the calculation.
Audit Item Item Description                           Action Reference While the NRC staff was reviewing the licensee's evaluation of the ventilation provided in the battery room, the staff requested that the licensee provide an evaluation on the ventilation in the battery board and charger rooms to protect against the effects of extreme temperatures. The licensee provided NMP1 calculation S10-HVAC-HVOS, Rev. 2, "Battery Board Room Low temperature." The NRC staff reviewed and discussed this calculation with ISE Cl 3.2.4.2.B Battery Board and Charger Rooms Ventilation the licensee and identified that for low temperatures SE Review Item 7 in the battery board room, this calculation recommended interim actions to be taken if the temperature in the room dips below a certain level.
After the onsite audit, the licensee provided a revised calculation.
However, these interim actions were not defined in the calculation. After the onsite audit, the licensee provided a revised calculation. In addition, the licensee provided its evaluation of the ventilation in the battery charger room. The NRC staff is currently reviewing the calculations.
In addition, the licensee provided its evaluation of the ventilation in the battery charger room. The NRC staff is currently reviewing the calculations.
The NRC staff is currently reviewing the NMP1 ISE Cl 3.2.4.9.A Refueling Strategy refueling strategy.
ISE Cl 3.2.4.9.A Refueling Strategy The NRC staff is currently reviewing the NMP1 refueling strategy.
The NRC staff requested that the licensee provide NMP1 analytical results to support the conclusions that the predictions of the code(s) used are consistent with expected plant behavior and that core cooling would be maintained by performing the AQ 13           Analytical Code to Predict ELAP Event       identified actions within their time constraints. The licensee provided NMP1 SAFE and SUPERHEX calculations to demonstrate that adequate core cooling is maintained during an ELAP event. The staff is currently reviewing the SAFE and SUPERHEX calculations.
The NRC staff requested that the licensee provide NMP1 analytical results to support the conclusions that the predictions of the code(s) used are consistent with expected plant behavior and that core cooling would be maintained by performing the AQ 13 Analytical Code to Predict ELAP Event identified actions within their time constraints.
 
The licensee provided NMP1 SAFE and SUPERHEX calculations to demonstrate that adequate core cooling is maintained during an ELAP event. The staff is currently reviewing the SAFE and SUPERHEX calculations.
Audit Item Item Description Action Reference The NRC staff requested that the licensee address the use of raw water sources for core cooling to mitigate an ELAP event and the potential for fuel channel inlet blockage. Specifically, the NRC staff discussed with the licensee that if raw water is used for core cooling (even if it is filtered), the licensee should provide assurance of top down cooling, SE Review Item 4 Raw Water Sources where rising steam may have the capability to dislodge blockage across channel outlets which typically have more open area and larger openings than channel inlets. After the onsite audit, the licensee provided a position paper to justify using raw water sources. The NRC staff is currently reviewinQ the position paper.
Audit Item Item Description Action Reference The NRC staff requested that the licensee address the use of raw water sources for core cooling to mitigate an ELAP event and the potential for fuel channel inlet blockage.
During the onsite audit, the NRC staff verified that appropriate human factors are being applied for the implementation of the NMP1 FLEX strategies. As a follow-up item from discussions, the NRC staff requested that the licensee provide the validation SE Review Item 5 Human Factors for the timing of the staging and setup of the NMP1 FLEX RCS injection pump. After the onsite audit, the licensee provided the NMP1 FLEX pump deployment validation. The NRC staff is currently reviewing the validation.
Specifically, the NRC staff discussed with the licensee that if raw water is used for core cooling (even if it is filtered), the licensee SE Review Item 4 Raw Water Sources should provide assurance of top down cooling, where rising steam may have the capability to dislodge blockage across channel outlets which typically have more open area and larger openings than channel inlets. After the onsite audit, the licensee provided a position paper to justify using raw water sources. The NRC staff is currently reviewinQ the position paper. During the onsite audit, the NRC staff verified that appropriate human factors are being applied for the implementation of the NMP1 FLEX strategies.
 
As a follow-up item from discussions, the NRC staff SE Review Item 5 Human Factors requested that the licensee provide the validation for the timing of the staging and setup of the NMP1 FLEX RCS injection pump. After the onsite audit, the licensee provided the NMP1 FLEX pump deployment validation.
NMP2 Mitigation Strategies/Spent Fuel Pool Instrumentation Safety Evaluation Audit Items:
The NRC staff is currently reviewing the validation.
Audit Items Currently Under NRC Staff Review But Not Requiring Further Licensee Input Audit Item Item Description                                     Action Reference The NRG staff is currently reviewing the NMP2 ISE Cl 3.2.4.9.A   Refueling Strategy refuelinq strateav.
NMP2 Mitigation Strategies/Spent Fuel Pool Instrumentation Safety Evaluation Audit Items: Audit Items Currently Under NRC Staff Review But Not Requiring Further Licensee Input Audit Item Item Description Reference Action ISE Cl 3.2.4.9.A Refueling Strategy The NRG staff is currently reviewing the NMP2 refuelinq strateav.
 
P. Orphanos If you have any questions, please contact me at 301-415-5888 or by e-mail at Jason.paige@nrc.gov.
P. Orphanos                                       If you have any questions, please contact me at 301-415-5888 or by e-mail at Jason.paige@nrc.gov.
Docket Nos.: 50-220 and 50-410  
Sincerely, IRA/
Jason Paige, Project Manager Orders Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket Nos.: 50-220 and 50-410


==Enclosure:==
==Enclosure:==


Audit report cc w/encl: Distribution via Listserv DISTRIBUTION:
Audit report cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC JOMBD R/F RidsNrrDorllpl 1-1 Resource RidsNrrPMNineMilePoint Resource RidsNrrLASLent Resource RidsAcrsAcnw_MailCTR Resource ADAMS Accession No. ML 1511 OA026 Sincerely, IRA/ Jason Paige, Project Manager Orders Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation RidsRgn1 MailCenter Resource JPaige, NRR/JLD JBowen, NRR/JLD *via email OFFICE NRR/JLD/JOMB/PM NRR/JLD/LA NRR/JLD/JCBB/BC NRR/JLD/JERB/BC NAME JPaige Slent SBailey (BTitus for) SWhaley DATE 04/22/15 04/21/15 04/23/15 04/22/15 OFFICE NRR/JLD/JOMB/BC(A)
PUBLIC                                               RidsRgn1 MailCenter Resource JOMBD R/F                                           JPaige, NRR/JLD RidsNrrDorllpl 1-1 Resource                         JBowen, NRR/JLD RidsNrrPMNineMilePoint Resource RidsNrrLASLent Resource RidsAcrsAcnw_MailCTR Resource ADAMS Accession No.       ML 1511 OA026                                                   *via email OFFICE     NRR/JLD/JOMB/PM         NRR/JLD/LA           NRR/JLD/JCBB/BC         NRR/JLD/JERB/BC NAME       JPaige                 Slent               SBailey (BTitus for)   SWhaley DATE       04/22/15               04/21/15             04/23/15               04/22/15 OFFICE     NRR/JLD/JOMB/BC(A) NRR/JLD/JOMB/PM NAME       MHalter (MBrown for)   JPaige DATE       04/28/15               04/28/15 OFFICIAL AGENCY RECORD}}
NRR/JLD/JOMB/PM NAME MHalter (MBrown for) JPaige DATE 04/28/15 04/28/15 OFFICIAL AGENCY RECORD}}

Latest revision as of 14:11, 19 March 2020

Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051
ML15110A026
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 04/28/2015
From: Jason Paige
Japan Lessons-Learned Division
To: Orphanos P
Exelon Generation Co
Paige J, NRR/JLD, 415-5888
References
EA-12-049, EA-12-051, TAC MF1129, TAC MF1130, TAC MF1131, TAC MF1132
Download: ML15110A026 (23)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 28, 2015 Mr. Peter M. Orphanos Site Vice President Nine Mile Point Nuclear Station 348 Lake Road Oswego, NY 13126

SUBJECT:

NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 - REPORT FOR THE ONSITE AUDIT REGARDING IMPLEMENTATION OF MITIGATING STRATEGIES AND RELIABLE SPENT FUEL INSTRUMENTATION RELATED TO ORDERS EA-12-049 AND EA-12-051 (TAC NOS. MF1129, MF1130, MF1131, AND MF1132)

Dear Mr. Orphanos:

On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events" and Order EA-12-051, "Order to Modify Licenses With Regard To Reliable Spent Fuel Pool Instrumentation," (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML12054A736 and ML12054A679, respectively). The orders require holders of operating reactor licenses and construction permits issued under Title 1O of the Code of Federal Regulations Part 50 to submit for review, Overall Integrated Plans (OIPs) including descriptions of how compliance with the requirements of of each order will be achieved.

By letter dated February 28, 2013 (ADAMS Accession No. ML13066A171 ), Exelon Generation, LLC, previously as Constellation Energy Nuclear Group, LLC (Exelon, the licensee) submitted its OIP for Nine Mile Point Nuclear Station, Units 1 and 2 (NMP), in response to Order EA 049. By letter dated March 8, 2013 (ADAMS Accession No. ML13074A056), Exelon submitted a complete revision of the OIP for NMP. By letters dated August 27, 2013, February 27, 2014, August 26, 2014, and February 19, 2015 (ADAMS Accession Nos. ML13254A278, ML14069A318, ML14241A380, and ML15062A036, respectively), the licensee submitted its first four six-month updates to the OIP. By letter dated August 28, 2013 (ADAMS Accession No. ML13234A503), the NRC notified all licensees and construction permit holders that the staff is conducting audits of their responses to Order EA-12-049 in accordance with NRC Office of Nuclear Reactor Regulation (NRR) Office Instruction LIC-111, "Regulatory Audits" (ADAMS Accession No. ML082900195). This audit process led to the issuance of the NMP interim staff evaluation (ISE) (ADAMS Accession No. ML13225A584) and continues with in-office and onsite portions of this audit.

P. Orphanos By letter dated February 28, 2013 (ADAMS Accession No. ML13066A172), the licensee submitted its 01 P for NMP in response to Order EA-12-051. By letter dated June 5, 2013 (ADAMS Accession No. ML13154A399), the NRG staff sent a request tor additional information (RAI) to the licensee. By letters dated July 5, 2013, August 27, 2013, February 24, 2014, August 26, 2014, and February 19, 2015 (ADAMS Accession Nos. ML13197A220, ML13254A279, ML14069A180, ML14241A016, and ML15062A035, respectively), the licensee submitted its RAI responses and first tour six-month updates to the OIP.

The NRG staff's review to date led to the issuance of the NMP ISE and RAI dated November 15, 2013 (ADAMS Accession No. ML13281A205). By letter dated March 26, 2014 (ADAMS Accession No. ML14083A620), the NRG notified all licensees and construction permit holders that the staff is conducting in-office and onsite audits of their responses to Order EA 051 in accordance with NRG NRR Office Instruction LIG-111, as discussed above.

The ongoing audits allow the staff to review open and confirmatory items from the mitigation strategies ISE, RAI responses from the spent fuel pool instrumentation (SFPI) ISE, the licensee's integrated plans, and other audit questions. Additionally, the staff gains a better understanding of submitted and updated information, audit information provided on ePortals, and preliminary Overall Program Documents/Final Integrated Plans while identifying additional information necessary for the licensee to supplement its plan and staff potential concerns.

In support of the ongoing audit of the licensee's OIPs, as supplemented, the NRG staff conducted an onsite audit at NMP from November 3-7, 2014, per the audit plan dated October 8, 2014 (ADAMS Accession No. ML14274A288). The purpose of the onsite portion of the audit was to provide the NRG staff the opportunity to continue the audit review and gain key insights most easily obtained at the plant as to whether the licensee is on the correct path tor compliance with the Mitigation Strategies and SFPI orders. The onsite activities included detailed analysis and calculation discussion, walk-throughs of strategies and equipment laydown, visualization of portable equipment storage and deployment, staging and deployment of offsite equipment, and physical sizing and placement of SFPI equipment.

The enclosed audit report provides a summary of the activities for the onsite audit portion.

Additionally, this report contains an attachment listing all open audit items currently under NRG staff review.

P. Orphanos If you have any questions, please contact me at 301-415-5888 or by e-mail at Jason.paige@nrc.gov.

Jason Pai , Project Manager Orders Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket Nos.: 50-220 and 50-41 O

Enclosure:

Audit report cc w/encl: Distribution via Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 AUDIT REPORT BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO ORDERS EA-12-049 AND EA-12-051 MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS AND RELIABLE SPENT FUEL POOL INSTRUMENTATION EXELON GENERATION, LLC NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 DOCKET NOS. 50-220 AND 50-410 BACKGROUND AND AUDIT BASIS On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRG) issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events" and Order EA-12-051, "Order to Modify Licenses With Regard To Reliable Spent Fuel Pool Instrumentation," (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML12054A736 and ML12054A679, respectively). The orders require holders of operating reactor licenses and construction permits issued under Title 10 of the Code of Federal Regulations Part 50 to submit for review, Overall Integrated Plans (OIPs) including descriptions of how compliance with the requirements of of each order will be achieved.

By letter dated February 28, 2013 (ADAMS Accession No. ML13066A171 ), Exelon Generation, LLC, previously as Constellation Energy Nuclear Group, LLC (Exelon, the licensee) submitted its OIP for Nine Mile Point Nuclear Station, Units 1 and 2 (NMP1, NMP2), in response to Order EA-12-049. By letter dated March 8, 2013 (ADAMS Accession No. ML13074A056), Exelon submitted a complete revision of the OIP for NMP. By letters dated August 27, 2013, February 27, 2014, August 26, 2014, February 19, 2015 (ADAMS Accession Nos. ML13254A278, ML14069A318, ML14241A380, and ML15062A036, respectively), the licensee submitted its first four six-month updates to the OIP. By letter dated August 28, 2013 (ADAMS Accession No. ML13234A503), the NRG notified all licensees and construction permit holders that the staff is conducting audits of their responses to Order EA-12-049 in accordance with NRG Office of Nuclear Reactor Regulation (NRR) Instruction LIC-111, "Regulatory Audits" (ADAMS Accession No. ML082900195). This audit process led to the issuance of the NMP interim staff evaluation (ISE)(ADAMS Accession No. ML13225A584) and continues with in-office and onsite portions of this audit.

Enclosure

By letter dated February 28, 2013 (ADAMS Accession No. ML13066A172), the licensee submitted its 01 P for NMP in response to Order EA-12-051. By letter dated June 5, 2013 (ADAMS Accession No. ML13154A399), the NRC staff sent a request for additional information (RAI) to the licensee. By letters dated July 5, 2013, August 27, 2013, February 24, 2014, August 26, 2014, and February 19, 2015 (ADAMS Accession Nos. ML13197A220, MU 3254A279, MU 4069A 180, MU 4241 A016, and MU 5062A035, respectively), the licensee submitted its RAI responses and first four six-month updates to the OIP.

The NRC staff's review to date led to the issuance of the NMP ISE and RAI dated November 15, 2013 (ADAMS Accession No. ML13281A205). By letter dated March 26, 2014 (ADAMS Accession No. ML14083A620), the NRC notified all licensees and construction permit holders that the staff is conducting in-office and onsite audits of their responses to Order EA 051 in accordance with NRC NRR Office Instruction LIC-111, as discussed above.

The ongoing audits allow the staff to review open and confirmatory items from the mitigation strategies ISE, RAI responses from the spent fuel pool instrumentation (SFPI) ISE, the licensee's integrated plans, and other audit questions. Additionally, the staff gains a better understanding of submitted and updated information, audit information provided on ePortals, and preliminary Overall Program Documents (OPDs)/Final Integrated Plans (FIPs) while identifying additional information necessary for the licensee to supplement its plan and staff potential concerns.

In support of the ongoing audit of the licensee's OIPs, as supplemented, the NRC staff conducted an onsite audit at NMP from November 3-7, 2014, per the audit plan dated October 8, 2014 (ADAMS Accession No. ML14274A288). The purpose of the onsite portion of the audit was to provide the NRC staff the opportunity to continue the audit review and gain key insights most easily obtained at the plant as to whether the licensee is on the correct path for compliance with the Mitigation Strategies and SFPI orders. The onsite activities included detailed analysis and calculation discussion, walk-throughs of strategies and equipment laydown, visualization of portable equipment storage and deployment, staging and deployment of offsite equipment, and physical sizing and placement of SFPI equipment.

Following the licensee's declarations of order compliance, the NRC staff will evaluate the OIPs, as supplemented, the resulting site-specific OPDs/FIPs, and, as appropriate, other licensee submittals based on the requirements in the orders. For Order EA-12-049, the staff will make a safety determination regarding order compliance using the Nuclear Energy Institute (NEI) guidance document NEI 12-06, "Diverse and Flexible Coping Strategies (FLEX) Implementation Guide" issued in August, 2012 (ADAMS Accession No. ML12242A378), as endorsed, by NRC Japan Lessons-Learned Directorate (JLD) interim staff guidance (ISG) JLD-ISG-2012-01 "Compliance with Order EA-12-049, 'Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events"' (ADAMS Accession No. ML12229A174) as providing one acceptable means of meeting the order requirements. For Order EA-12-051, the staff will make a safety determination regarding order compliance using the NEI guidance document NEI 12-02, Revision 1, "Industry Guidance for Compliance with NRC Order EA-12-051, 'To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation"' (ADAMS Accession No. ML12240A307), as endorsed, with exceptions and clarifications, by NRC JLD-ISG-2012-03 "Compliance with Order EA-12-051, 'Reliable Spent

Fuel Pool Instrumentation"' (ADAMS Accession No. ML12221A339) as providing one acceptable means of meeting the order requirements. Should the licensee propose an alternative strategy or other method deviating from the guidance, additional staff review will be required to evaluate if the alternative strategy complies with the applicable order.

AUDIT ACTIVITIES The onsite audit was conducted at the NMP facility from November 3, 2014, through November 7, 2014. The NRC audit team staff was as follows:

Title Team Member Team Lead/Project Manager Jason Paige Technical Support Michael Levine Technical Support Prem Sahay Technical Support Stephen Wyman Technical Support Brett Titus Technical Support Joshua Miller Branch Chief Stewart Bailey The NRC staff executed the onsite portion of the audit per the three part approach discussed in the October 8, 2014, plan, to include conducting a tabletop discussion of the site's integrated mitigating strategies compliance program, a review of specific technical review items, and discussion of specific program topics. Activities that were planned to support the above included detailed analysis and calculation discussions, walk-throughs of strategies and equipment laydown, visualization of portable equipment storage and deployment, staging and deployment of offsite equipment, and physical sizing and placement of SFPI equipment.

AUDIT

SUMMARY

NMP1 and NMP2 compliance dates for the orders are spring 2015 and spring 2016, respectively. As communicated in the October 8, 2014, plan, NMP1 and NMP2 have two sets of questions due to the units having different strategies to mitigate an extended loss of alternating current power (ELAP) event. Therefore, the staff focused its onsite review on the NMP1 strategy, which is reflected in the summary below. However, Attachments 3 and 4 provide a status of NMP1 and NMP2 items that require additional information from the licensee and items that are still under NRC review.

1.0 Entrance Meeting (November 3, 2014)

At the audit entrance meeting, the NRC staff audit team introduced itself followed by introductions from the licensee's staff. The NRC audit team provided a brief overview of the audit's objectives and anticipated schedule.

2.0 Integrated Mitigating Strategies Compliance Program Overview Per the audit plan and as an introduction to the site's program, the licensee provided a presentation to the NRC audit team titled "Nine Mile Point Nuclear Station FLEX and

SFPLI [spent fuel pool level instrumentation] NRC Audit Orientation." The licensee provided an overview of its strategy to maintain core cooling, containment, and SFP cooling in the event of a beyond-design-basis external event (BDBEE), and the plant modifications being done in order to implement the strategies. Also presented was the design and location of the FLEX equipment storage facility, the FLEX equipment that would be stored there, the interface with the National SAFER Response Center (NSRC),

and the spent fuel pool level indication modification.

3.0 Onsite Audit Technical Discussion Topics Based on the audit plan, and with a particular emphasis on the Part 2 "Specific Technical Review Items," the NRC staff technical reviewers conducted interviews with licensee technical staff, site walk-downs, and detailed document review for the items listed in the plan. Results of these technical reviews that require additional information from the licensee or still under NRC review are documented in the audit item status tables in Attachments 3 and 4, as discussed in the Conclusion section below.

3.1 Reactor Systems Technical Discussions and Walk-Downs The NRC staff reviewed NMP1 modeling of an ELAP and its ability to mitigate the event, including the computer code used for the ELAP analysis and input parameters assumed to generate the results of the analysis. Originally, the staff understood that the licensee would use the code Modular Accident Analysis Program (MAAP4) to perform its analysis of reactor coolant system (RCS) cooling and inventory control during an ELAP.

However, in a 6-month update, the licensee stated that NMP1 is not intending to use the MAAP4 pathway, but will rely on the SAFE and SUPERHEX codes. These codes have not been reviewed for an ELAP condition. Therefore, the staff is currently reviewing the licensee's use of the SAFE and SUPERHEX codes to analyze an ELAP condition at NMP1.

3.2 Electrical Technical Discussions and Walk-Downs The NRC staff reviewed the calculations on sizing for the FLEX diesel generators (DG),

calculations on extending battery life based on load shedding, and walked down the switchgear, direct current (de) equipment, and battery rooms to evaluate strategies for hydrogen and temperature control. The NRC staff reviewed the licensee's NMP1 FLEX DG sizing calculation and verified that the total calculated power demand for the FLEX DGs is less than the generator rating of 563 kVA. In addition, the NRC staff reviewed the licensee's NMP1 load shed calculation. The licensee will begin the NMP1 load shed at the beginning of the ELAP event and will complete the shed within 30 minutes. The calculation determined that the maximum coping time would be approximately 8.3 hours0.125 days <br />0.0179 weeks <br />0.00411 months <br /> for the batteries upon load shed occurring within 30 minutes following the event. The licensee plans to deploy the FLEX DGs within 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> of the event and energize the battery chargers in 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> to repower the 125VDC loads.

During normal plant operation, the battery room ventilation is provided from the turbine building (TB) ventilation system. The battery room ventilation occurs by air flow being drawn through the battery door louvers and room air volume being discharged through

the TB ventilation exhaust ducts located in the room. The TB ventilation is non safety-related and during an ELAP condition, this system is not functional. Therefore, during an ELAP, the hydrogen gas will accumulate in the ventilation duct, which is located above the battery rooms, while the batteries are being recharged. To prevent unacceptable hydrogen gas concentrations in the battery room ventilation ducts, 3 inch diameter holes are located on the top of the battery room exhaust ducts. The exhaust holes are normally closed by dampers and open during a loss of power. The exhaust holes will allow the hydrogen gas to escape from the duct into the TB atmosphere. Due to the immense volume of the TB, the hydrogen concentration will be extremely low (below 1 percent). This condition has been previously analyzed for loss of forced ventilation due to loss of offsite power in NMP Calculation S1 O-H2GAS-HV01, Revision 0 and disposition OOA. The NRC staff verified with the licensee that the damper controlling hole induct above the batteries fail open and will remain open to dissipate hydrogen to the TB.

3.3 SFPI Technical Discussions and Walk-Downs The NRC staff walked down the SFP area, SFPI locations, and related equipment mounting areas. No concerns were identified during the walk-downs.

3.4 Other Technical Discussion Areas and Walk-Downs

a. The NMP FLEX storage configuration consists of two storage buildings. One building will store N sets of FLEX equipment (N-building) and the second building (+ 1-building) will contain the additional + 1, set of FLEX equipment. The N-building is hardened against all BDBEEs and the + 1-building is hardened against all BDBEEs except for tornado winds/missiles.

NRC staff identified that the NMP N-building I+ 1-building FLEX equipment storage configuration is not consistent with the tornado wind/missile hazard reasonable protection configurations described in the guidance contained in Section 7.3.1 of NEI 12-

06. Section 7.3.1.1.a describes a configuration where FLEX equipment is reasonably protected in a structure designed to withstand the tornado wind/missile hazard. The+ 1 building is not hardened against tornado hazards and, therefore, does not meet the guidance contained in NEI 12-06, Section 7.3.1.1.a.

NEI 12-06, Sections 7.3.1.1.b and 7.3.1.1.c describe configurations where FLEX equipment is reasonably protected against tornado hazards by an adequate separation distance and orientation. The NRC position is that configuration 7.3.1.1.b and 7.3.1.1.c require N sets of equipment to be stored in each diverse location for a FLEX storage configuration that consists of only 2 locations. While the N-building and + 1-building are adequately separated, only one of the locations contains the full N set of FLEX equipment and, therefore, does not meet the guidance contained in NEI 12-06, Section 7.3.1.1.b or 7.3.1.1.c.

NEI 12-06, Section 11.3.3 states the following:

FLEX mitigation equipment should be stored in a location or locations informed by evaluations performed per Sections 5 through 9 such that no one external event can reasonably fail the site FLEX capability (N).NEI Section 10.1, "Aggregation of FLEX Strategies," includes the following:

Provision of at least N+ 1 sets of portable on-site equipment stored in diverse locations or in structures designed to reasonably protect from applicable BDBEEs is essential to provide reasonable assurance that N sets of FLEX equipment will remain deployable to assure success of the FLEX strategies.

Per the guidance above, it is essential to reasonably protect at least N+ 1 sets of FLEX equipment from all applicable BDBEEs to reasonably assure that N sets (FLEX capability, per section 11.3.3) will remain deployable after the BDBEE. When the reasonable protection scheme of either Section 7.3.1.1.b or 7.3.1.1.c. is utilized, 2 sets of N FLEX equipment must be located in the separate locations. The NMP FLEX equipment storage configuration does not meet the reasonable protection schemes of Section 7.3.1.1.b or 7.3.1.1.c since N sets of FLEX equipment are not contained in both locations. Also, as noted above, the NMP FLEX equipment storage configuration does not meet the reasonable protection scheme of Section 7.3.1.1.a since only N sets of FLEX equipment are stored in a robust structure that protects against all BDBEEs.

Therefore, the NMP FLEX equipment storage configuration does not meet the guidance contained in N El 12-06, Section 10.1, in that it only affords reasonable protection from all applicable BDBEEs for N sets of FLEX equipment, not N+ 1 sets, as stipulated in the NEI guidance as described above.

The NRC staff further identified that the NMP FLEX storage configuration would not support the maintenance and testing provisions contained in Section 11.5.3 of NEI 12-

06. Specifically, section 11.5.3.b states:

Portable equipment may be unavailable for 90 days provided that the site FLEX capability (N) is available.

Should an item of FLEX equipment be made unavailable in the N-building, the site FLEX capability (N) would no longer be available to mitigate a tornado related BDBEE. The corresponding + 1 item of FLEX equipment is not considered to be reasonably protected against the tornado hazard, and therefore, is not reasonably assured to be available or remain deployable to assure success of the FLEX strategies. The remaining available and deployable FLEX equipment, reasonably protected in the N-building, would be less than the site FLEX capability (N). Therefore, the NMP FLEX equipment storage configuration would not meet the condition included in NEI 12-06, Section 11.5.3.b (site Flex capability (N) is available) stipulated for the allowance of the 90-day portable equipment unavailability.

The NRC staff communicated to the licensee that the NMP FLEX storage configuration is not consistent with guidance contained in NEI 12-06. Further consideration of the

NMP FLEX storage configuration by the NRG staff would require that the licensee propose the configuration as an alternative to the guidance of NEI 12-06, accompanied with appropriate justification. Lastly, the NRG staff recognizes that the N-building is hardened against all BDBEEs and stores the required minimum set of FLEX equipment for NMP1 to mitigate an ELAP event; therefore, this issue is applicable once NMP2 must comply with the mitigating strategies (MS) order and is being tracked as a NMP2 item (see Attachment 3, NMP2 MS/SFPI safety evaluation (SE) Audit Items currently under NRG staff review and requiring licensee input as delineated).

b. The NRG staff reviewed the licensee's evaluation of the refueling floor SFP area for the possibility of steam and condensation during an ELAP event. The licensee provided calculation SO-GOTHIC-ELAP001 that concluded, by opening specific doors and vents within 3 hours0.125 days <br />0.0179 weeks <br />0.00411 months <br />, the maximum temperature would be 168 °F in the SFP area. Special Operating Procedure, N1-SOP-33A.2, "Station Blackout/ELAP", Section 5.6, directs that some of the subject doors will be breached when the hoses are initially laid (within approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />) while other doors and vents will be opened by or before 8 hours0.333 days <br />0.0476 weeks <br />0.011 months <br />.

Figure 1B shows that the difference between opening the doors at 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, 3 hours0.125 days <br />0.0179 weeks <br />0.00411 months <br />, or not at all causes a variance of only 5 degrees °F at the 8-hour mark, so the opening of the doors is not time critical, and the verbiage of the procedure is sufficient. The licensee identified this lack of sensitivity to the timing of the door opening on page 28 of the SO-GOTHIC-ELAP001 calculation stating, "The impact of the time to open the door has essentially no impact on the temperature transient."

c. The NRG staff reviewed the licensee's FLEX equipment hydraulic analysis; Calculation SO-FLEX-F001, "NMP1 FLEX Hydraulic Flow Evaluation." The staff's review focused on the FLEX flow path characteristics including net positive suction head available, friction and elevation head losses, and pressures and flow rates required for injection and whether the FLEX pumps have the capability to meet these requirements. The staff questioned the licensee's ability to inject into the reactor pressure vessel (RPV) following the isolation of one of the emergency condensers (ECs), as the resulting RPV pressure increase is above that required for injection. The licensee stated that procedures will be revised to direct operators to maintain RPV pressure below the limit required for FLEX injection using the emergency relief valves.

In addition, the staff reviewed the flow and pressure requirements for core cooling, containment, and SFP cooling and whether the pumps supplied by the NSRC are capable of meeting those requirements. The staff reviewed the licensee's calculation (SO-FLEX-F001) and compared the flow and pressure values to the pump capacities listed in the NSRC Equipment Technical Requirements, AREVA document 51-919971-012.

d. The NRG staff reviewed the licensee's plan for sharing facility resources between units.

The staff's review focused on the identification of any shared resources and the management of those resources during an ELAP event. The licensee stated that the two units will share FLEX resources for debris removal, towing, refueling, FLEX storage, and offsite communications. The licensee stated that deployment strategies include expected priority for equipment. The licensee no longer plans to share the dry hydrants

from one unit to the other. The licensee stated that dry hydrants are no longer planned for NMP1 and that the dry hydrant design for NMP2 is not presently expected to be sized to accommodate the combined flow for NMP1 and NMP2.

e. The NRC staff reviewed the licensee's evaluation of the accessibility and survivability of equipment housed in the TB following a BDBEE. For example, the licensee's strategy requires operators to respond and control level in the ECs by throttling manual valves in the TB. The licensee stated that although the TB is a Class II structure, for seismic design, the entire TB complex was evaluated as a Class I structure and is designed to withstand the same peak ground acceleration as the reactor building, a Class I structure.

4.0 Exit Meeting (November 7, 2014)

The NRC staff audit team conducted an exit meeting with the licensee staff following the closure of onsite audit activities. The NRC staff highlighted items reviewed and noted that the results of the onsite audit trip will be documented in this report. The following items that require additional information from the licensee or still under NRC review were discussed at the exit meeting (see Attachments 3 and 4 for additional information):

a. ISE Cl 3.2.1.2.A, Recirculation System Leakage The staff requested that the licensee provide justification of the pressure dependence of the assumed recirculation system leakage rates and the recirculation pump seal leakage rates that were used in the ELAP analysis, whether the leakage was determined to be single-phase, two-phase, or steam at the donor cell, and how mixing of the leakage flow with the drywell atmosphere was modeled. The licensee provided calculations ET-S-331, "Testing of the CAN2A Seal Cartridge Under Station Blackout Conditions," and ET-S-426, "Testing of the CAN2A Seal Cartridge Under Station Blackout Conditions - Phase 2," for justification of the seal leakage rates under station blackout conditions. The staff is currently reviewing the calculations.
b. ISE Cl 3.2.4.2.B and SE Review Item 7, Battery Board and Charger Rooms Ventilation While the NRC staff was reviewing the licensee's evaluation of the ventilation provided in the battery room, the staff requested that the licensee provide an evaluation on the ventilation in the battery board and charger rooms to protect against the effects of extreme temperatures. The licensee provided NMP1 calculation S 1O-HVAC-HV05, Rev. 2, "Battery Board Room Low temperature." The NRC staff reviewed and discussed this calculation with the licensee and identified that for low temperatures in the battery board room, this calculation recommended interim actions to be taken if the temperature in the room dips below a certain level.

However, these interim actions were not defined in the calculation. After the onsite audit, the licensee provided a revised calculation. In addition, the licensee provided its evaluation of the ventilation in the battery charger room. The NRC staff is currently reviewing the calculations.

c. AQ 13, Analytical Code(s) to Predict ELAP Timeline The NRC staff requested that the licensee provide NMP1 analytical results to support the conclusions that the predictions of the code(s) used are consistent with expected

plant behavior and that core cooling would be maintained by performing the identified actions within their time constraints. The licensee provided NMP1 SAFE and SUPERHEX calculations to demonstrate that adequate core cooling is maintained during an ELAP event. The staff is currently reviewing the SAFE and SUPERHEX calculations.

d. SE Review Item 4, Raw Water Sources The NRG staff requested that the licensee address the use of raw water sources for core cooling to mitigate an ELAP event and the potential for fuel channel inlet blockage. Specifically, the NRG staff discussed with the licensee that if raw water is used for core cooling (even if it is filtered), the licensee should provide assurance of top-down cooling, where rising steam may have the capability to dislodge blockage across channel outlets which typically have more open area and larger openings than channel inlets. After the onsite audit, the licensee provided a position paper to justify using raw water sources. The NRG staff is currently reviewing the position paper.
e. SE Review Item 5, Human Factors During the onsite audit, the NRG staff verified that appropriate human factors are being applied for the implementation of the NMP1 FLEX strategies. As a follow-up item from discussions, the NRG staff requested that the licensee provide the validation for the timing of the staging and setup of the NMP1 FLEX RCS injection pump. After the onsite audit, the licensee provided the NMP1 FLEX pump deployment validation. The NRG staff is currently reviewing the validation.

CONCLUSION The NRG staff completed all three parts of the October 8, 2014, onsite audit plan. Each audit item listed in Part 2 of the plan was reviewed by NRG staff members while on site. In addition to the list of NRG and licensee onsite audit staff participants in Attachment 1, Attachment 2 provides a list of documents reviewed during the onsite audit portion.

In support of the continuing audit process as the licensee proceeds towards orders compliance for this site, Attachments 3 and 4 provide the status of all open audit review items that the NRG staff is evaluating in anticipation of issuance of a combined SE for both the Mitigation Strategies and Spent Fuel Pool Level Instrumentation orders. The five sources for the audit items referenced below are as follows:

a. Interim Staff Evaluation (ISE) Open Items (Ols) and Confirmatory Items (Cls)
b. Audit Questions (AQs)
c. Licensee-identified Overall Integrated Plan (OIP) Open Items (Ols)
d. Spent Fuel Pool Level Instrumentation (SFPLI) Requests for Additional Information (RAls)
e. Additional SE needed information

The attachments provide audit information as follows:

a. Attachment 1: List of NRG staff and licensee staff audit participants
b. Attachment 2: List of documents reviewed during the onsite audit
c. Attachment 3: NMP1 and NMP2 MS/SFPI SE Audit Items currently under NRG staff review and requiring licensee input as delineated
d. Attachment 4: NMP1 and NMP2 MS/SFPI SE Audit Items currently under NRG staff review but not requiring further licensee input While this report notes the completion of the onsite portion of the audit per the audit plan dated October 8, 2014, the ongoing audit process continues as per the letters dated August 28, 2013, and March 26, 2014, to all licensees and construction permit holders for both orders.

Additionally, while Attachments 3 and 4 provide a progress snapshot of the NRG staff's review of the licensee's OIPs, as supplemented, and as augmented in the audit process, the status and progress of the NRG staff's review may change based on licensee plan changes, resolution of generic issues, and other NRG staff concerns not previously documented. Changes in the NRG staff review will be communicated in the ongoing audit process.

Lastly, the licensee has identified open items that need to be completed to implement orders EA-12-049 and EA-12-051, and the staff expects that the licensee continue to provide updates on the status of the licensee identified open items in their 6-month updates or on the e-Portal.

Attachments:

1. NRG and Licensee Staff Onsite Audit Participants
2. Onsite Audit Documents Reviewed
3. NMP1 and NMP2 MS/SFPI SE Audit Items currently under NRG staff review and requiring licensee input
4. NMP1 and NMP2 MS/SFPI SE Audit Items currently under NRG staff review but not requiring further licensee input

Onsite Audit Participants NRC Staff:

Jason Paige NRR/JLD/JOMB Brett Titus NRR/JLD/JCBB Michael Levine NRR/JLD/JCBB Joshua Miller NRR/JLD/JERB Prem Sahay NRR/JLD/JERB Stewart Bailey NRR/JLD/JCBB Stephen Wyman NRR/JLD/JERB NMP Staff:

Gregg Pitts Fukushima Project Terry Syrell Manager, Regulatory Assurance Brandon Varga Regulatory Assurance Peter Orphanos Site Vice President Kathy Picciott Site Fukushima Project Lead Michael Conway Fukushima Project Phil Amway Corporate Severe Accident Management Group Barry Thurston Corporate Severe Accident Management Group Josh Rocks Design Engineering George Wrobel Ginna Site Fukushima Project Lead Carol Kranich Manager, Site Nuclear Oversight Todd Fiorenza Manager, Site Project Management Attachment 1

Documents Reviewed

  • Calculation ET-S-331, Testing of the CAN2A Seal Cartridge Under Station Blackout Conditions
  • Calculation ET-S-426, Testing of the CAN2A Seal Cartridge Under Station Blackout Conditions - Phase 2
  • Calculation SO-GOTHIC-ELAP001
  • Calculation SO-GOTHIC-ELAP002, Primary Containment Response Following An Extended Loss of AC Power, Revision O
  • Special Operating Procedure, N1-SOP-33A.2, Station Blackout/ELAP
  • Calculation S 10-HVAC-HVOS, Battery Board Room Low temperature, Revision 2
  • Calculation S10-21OHV12-02
  • Calculation 600VACDGES-FLEX-BDB, Fukushima 600VAC FLEX-BDB-450KW/563KVA, Revision O
  • Calculation 125DCTRAIN11/12LFVD, 125VDC Power System 11 and 12 Load Flow Voltage Drop
  • Procedure OP-NM-102-106, Load Stripping, Revision O
  • Calculation SO-FLEX-F001, NMP1 FLEX Hydraulic Flow Evaluation
  • Calculation S10-H2GAS-HV01, Revision O
  • Calculation S14-54SFP-SL 1, Hydrodynamic Loading Analysis
  • Analysis ECP-13-000651-MU-009 SO-GOTHIC-ELAP001-N/A
  • Drawing C-23321-C Sheet 1 Attachment 2

NMP1 Mitigation Strategies/Spent Fuel Pool Instrumentation Safety Evaluation Audit Items:

Audit Items Currently Under NRC Staff Review And Requiring licensee Input Audit Item Item Description licensee Input Needed Reference Make available for review verification that the NMP1 maintenance and testing program for the FLEX equipment include (but not limited to) the SE Review Item 8 Maintenance and Testing acceptance and replacement criteria for electrical equipment (i.e., FLEX DGs, batteries, cables etc.).

In addition, provide the shelf life of components (i.e., 0-rinas, seals, battery life etc.).

Attachment 3

NMP2 Mitigation Strategies/Spent Fuel Pool Instrumentation Safety Evaluation Audit Items:

Audit Items Currently Under NRC Staff Review And Requiring Licensee Input Audit Item Item Description Licensee Input Needed Reference Make available for review a calculation to demonstrate that the assumed timeline is ISE 01 3.2.3.B Containment Functions appropriate and that containment functions will be restored and maintained following an ELAP event.

Make available for review a proposal that the FLEX storage building configuration is an alternative to ISE Cl 3.1.1.1.A FLEX Storage Building the guidance of NEI 12-06, accompanied with appropriate justification.

Make available for review the NMP2 deployment ISE Cl 3.1.1.2.A Deployment Routes routes and any considerations for possible impacts due to debris and soil liquefaction.

ISE Cl 3.2.1.1.A ISE Cl 3.2.1.1.B Make available for review the modular accident ISE Cl 3.2.1.1.C Analytical Code to Predict ELAP Event analysis program (MAAP) calculation once ISE Cl 3.2.1.1.D completed.

ISE Cl 3.2.1.1.E Make available for review the recirculation pump model and seal model as well as the maximum ISE Cl 3.2.1.2.A Recirculation System Leakage possible seal leakage and the seal leakage used to model the event.

Make available for review an evaluation of the ISE Cl 3.2.2.A Ventilation potential of steam and condensation in the refueling floor SFP area.

Audit Item Item Description Licensee Input Needed Reference Make available for review an evaluation of containment structures to identify necessary actions to enable implementation of the strategy with ISE Cl 3.2.3.A running RCIC [reactor core isolation cooling] pumps ISE Cl 3.2.4.2.A Ventilation with elevated temperatures. In addition, provide an SE Review Item 5 evaluation of the ventilation in the battery charger rooms to protect electrical equipment from the effects of high or low temperatures during an ELAP event.

ISE Cl 3.4.B Make available for review the hydraulic analysis for AO 16 Hydraulic Analysis the NMP2 FLEX equipment.

AO 17 Describe how FLEX equipment will be protected AO 1 Protection of Equipment and Connection Points and how connection points will be accessed during A02 a seismic event.

Identify and make available for review a list of FLEX SE Review Item 1 Instrumentation instrumentations that will be used to monitor FLEX electrical equipment.

Make available for review verification that the NMP2 maintenance and testing program for the FLEX equipment include (but not limited to) the SE Review Item 6 Maintenance and Testing acceptance and replacement criteria for electrical equipment (i.e., FLEX DGs, batteries, cables etc.).

In addition, provide the shelf life of components (i.e., 0-rings, seals, battery life etc.).

The NRC staff review did not find load shed coping time, sizing and load profile analyses for battery 2BYS*BAT2B in Calculation EC-203, Battery ISE Cl 3.2.4.1 O.A Battery Coping Times 2BYS*BAT2A and 2BYS*BAT2B, Revision 0. Make available for review the sizing, load profile and load shed copinq analyses for battery 2BYS*BAT2B.

NMP1 Mitigation Strategies/Spent Fuel Pool Instrumentation Safety Evaluation Audit Items:

Audit Items Currently Under NRC Staff Review But Not Requiring Further Licensee Input Audit Item Item Description Action Reference The staff requested that the licensee provide justification of the pressure dependence of the assumed recirculation system leakage rates and the recirculation pump seal leakage rates that were used in the ELAP analysis, whether the leakage was determined to be single-phase, two-phase, or steam at the donor cell, and how mixing of the leakage flow with the drywell atmosphere was ISE Cl 3.2.1.2.A Recirculation System Leakage modeled. The licensee provided calculations ET-S-331, "Testing of the CAN2A Seal Cartridge Under Station Blackout Conditions," and ET-S-426, "Testing of the CAN2A Seal Cartridge Under Station Blackout Conditions - Phase 2," for justification of the seal leakage rates under station blackout conditions. The staff is currently reviewing the calculations.

Attachment 4

Audit Item Item Description Action Reference While the NRC staff was reviewing the licensee's evaluation of the ventilation provided in the battery room, the staff requested that the licensee provide an evaluation on the ventilation in the battery board and charger rooms to protect against the effects of extreme temperatures. The licensee provided NMP1 calculation S10-HVAC-HVOS, Rev. 2, "Battery Board Room Low temperature." The NRC staff reviewed and discussed this calculation with ISE Cl 3.2.4.2.B Battery Board and Charger Rooms Ventilation the licensee and identified that for low temperatures SE Review Item 7 in the battery board room, this calculation recommended interim actions to be taken if the temperature in the room dips below a certain level.

However, these interim actions were not defined in the calculation. After the onsite audit, the licensee provided a revised calculation. In addition, the licensee provided its evaluation of the ventilation in the battery charger room. The NRC staff is currently reviewing the calculations.

The NRC staff is currently reviewing the NMP1 ISE Cl 3.2.4.9.A Refueling Strategy refueling strategy.

The NRC staff requested that the licensee provide NMP1 analytical results to support the conclusions that the predictions of the code(s) used are consistent with expected plant behavior and that core cooling would be maintained by performing the AQ 13 Analytical Code to Predict ELAP Event identified actions within their time constraints. The licensee provided NMP1 SAFE and SUPERHEX calculations to demonstrate that adequate core cooling is maintained during an ELAP event. The staff is currently reviewing the SAFE and SUPERHEX calculations.

Audit Item Item Description Action Reference The NRC staff requested that the licensee address the use of raw water sources for core cooling to mitigate an ELAP event and the potential for fuel channel inlet blockage. Specifically, the NRC staff discussed with the licensee that if raw water is used for core cooling (even if it is filtered), the licensee should provide assurance of top down cooling, SE Review Item 4 Raw Water Sources where rising steam may have the capability to dislodge blockage across channel outlets which typically have more open area and larger openings than channel inlets. After the onsite audit, the licensee provided a position paper to justify using raw water sources. The NRC staff is currently reviewinQ the position paper.

During the onsite audit, the NRC staff verified that appropriate human factors are being applied for the implementation of the NMP1 FLEX strategies. As a follow-up item from discussions, the NRC staff requested that the licensee provide the validation SE Review Item 5 Human Factors for the timing of the staging and setup of the NMP1 FLEX RCS injection pump. After the onsite audit, the licensee provided the NMP1 FLEX pump deployment validation. The NRC staff is currently reviewing the validation.

NMP2 Mitigation Strategies/Spent Fuel Pool Instrumentation Safety Evaluation Audit Items:

Audit Items Currently Under NRC Staff Review But Not Requiring Further Licensee Input Audit Item Item Description Action Reference The NRG staff is currently reviewing the NMP2 ISE Cl 3.2.4.9.A Refueling Strategy refuelinq strateav.

P. Orphanos If you have any questions, please contact me at 301-415-5888 or by e-mail at Jason.paige@nrc.gov.

Sincerely, IRA/

Jason Paige, Project Manager Orders Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket Nos.: 50-220 and 50-410

Enclosure:

Audit report cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsRgn1 MailCenter Resource JOMBD R/F JPaige, NRR/JLD RidsNrrDorllpl 1-1 Resource JBowen, NRR/JLD RidsNrrPMNineMilePoint Resource RidsNrrLASLent Resource RidsAcrsAcnw_MailCTR Resource ADAMS Accession No. ML 1511 OA026 *via email OFFICE NRR/JLD/JOMB/PM NRR/JLD/LA NRR/JLD/JCBB/BC NRR/JLD/JERB/BC NAME JPaige Slent SBailey (BTitus for) SWhaley DATE 04/22/15 04/21/15 04/23/15 04/22/15 OFFICE NRR/JLD/JOMB/BC(A) NRR/JLD/JOMB/PM NAME MHalter (MBrown for) JPaige DATE 04/28/15 04/28/15 OFFICIAL AGENCY RECORD