| number = ML16011A317
| number = ML16011A317
| issue date = 01/11/2016
| issue date = 01/11/2016
| title = Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term Per 10 CFR 50.67 (TAC Nos. MF6399 and MF6400)
| title = NRR E-mail Capture - Diablo Canyon 1 and 2 - Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term Per 10 CFR 50.67
| author name = Lingam S P
| author name = Lingam S
| author affiliation = NRC/NRR/DORL/LPLIV-1
| author affiliation = NRC/NRR/DORL/LPLIV-1
| addressee name = Schrader K J
| addressee name = Schrader K
| addressee affiliation = PG&E Corp
| addressee affiliation = PG&E Corp
| docket = 05000275, 05000323
| docket = 05000275, 05000323
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From:Lingam, Siva Sent: Monday, January 11, 2016 9:22 AM To: Schrader, Kenneth (KJSe@pge.com)
{{#Wiki_filter:NRR-PMDAPEm Resource From:                               Lingam, Siva Sent:                               Monday, January 11, 2016 9:22 AM To:                                 Schrader, Kenneth (KJSe@pge.com)
Cc:Pascarelli, Robert; Dennig, Robert; Bettle, Jerome; Woodyatt, Diana; 'mjrm@pge.com';
Cc:                                 Pascarelli, Robert; Dennig, Robert; Bettle, Jerome; Woodyatt, Diana; 'mjrm@pge.com';
Thatipamala, Ramakrishna; misf@pge.com; Wright, Michael (ENG)
Thatipamala, Ramakrishna; misf@pge.com; Wright, Michael (ENG)


==Subject:==
==Subject:==
Diablo Canyon 1 and 2 - Requests for Addi tional Information for License Amendment Request 15-03 to Adopt the Alternative So urce Term per 10 CFR 50.67 (TAC Nos.
Diablo Canyon 1 and 2 - Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term per 10 CFR 50.67 (TAC Nos.
MF6399 and MF6400)By a letter dated June 17, 2015 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15176A539), as supplemented by letters dated August 31, October 22, November 2, November 6, and December 17, 2015 (ADAMS Accession Nos. ML15243A363, ML15295A470, ML15321A235, ML15310A522, and ML16004A363, respectively
MF6399 and MF6400)
), Pacific Gas and Electric (PG&E, the licensee), submitted a license amendment request (LAR) to revise the licensing bases to adopt the alternative source term (AST) as allowed by Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.67, "Accident source term," for Diablo Canyon Power Plant (DCPP), Units 1 and 2. Please note the following official requests for additional information (RAIs) from our Containment and Ventilation Branch (SCVB) for the AST LAR. Please provide your responses within 30 days from the date of this e-mail. We transmitted the draft RAIs to you on December 7, 2015, and we had a clarification call on January 7, 2016. Your timely responses will allow the U.S. Nuclear Regulatory Commission staff to complete its review on schedule.
By a letter dated June 17, 2015 2015 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML15176A539), as supplemented by letters dated August 31, October 22, November 2, November 6, and December 17, 2015 (ADAMS Accession Nos. ML15243A363, ML15295A470, ML15321A235, ML15310A522, and ML16004A363, respectively), Pacific Gas and Electric (PG&E, the licensee), submitted a license amendment request (LAR) to revise the licensing bases to adopt the alternative source term (AST) as allowed by Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.67, Accident source term, for Diablo Canyon Power Plant (DCPP), Units 1 and 2. Please note the following official requests for additional information (RAIs) from our Containment and Ventilation Branch (SCVB) for the AST LAR. Please provide your responses within 30 days from the date of this e-mail. We transmitted the draft RAIs to you on December 7, 2015, and we had a clarification call on January 7, 2016. Your timely responses will allow the U.S. Nuclear Regulatory Commission staff to complete its review on schedule.
: 1. Assuming 100 cfm [cubic feet per minute] damper leakage, what impact does the installed back-draft dampers have on CR ventilation analyses assumptions or unfiltered in-leakage testing methods/results?
: 1. Assuming 100 cfm [cubic feet per minute] damper leakage, what impact does the installed back-draft dampers have on CR ventilation analyses assumptions or unfiltered in-leakage testing methods/results?
: 2. Containment spray in recirculation mode following Loss-of-Coolant Accident for fission product cleanup - explain requiring operation within 12 minutes. Does this change impact any bounding containment analyses?
: 2. Containment spray in recirculation mode following Loss-of-Coolant Accident for fission product cleanup
: 3. In Surveillance Requirement (SR) 3.6.3.1, the SR direction is to verify that the 48 inch containment purge valve is sealed closed with a frequency that is in accordance with the Surveillance Frequency Control Program. What is the initial frequency? Discuss how the frequency was determined and how the frequency may change over time.
        - explain requiring operation within 12 minutes. Does this change impact any bounding containment analyses?
: 3. In Surveillance Requirement (SR) 3.6.3.1, the SR direction is to verify that the 48 inch containment purge valve is sealed closed with a frequency that is in accordance with the Surveillance Frequency Control Program. What is the initial frequency? Discuss how the frequency was determined and how the frequency may change over time.
: 4. In SR 3.6.3.7, explain the rational for the removal of the surveillance within 92 days after opening the containment purge supply and exhaust valves.
: 4. In SR 3.6.3.7, explain the rational for the removal of the surveillance within 92 days after opening the containment purge supply and exhaust valves.
: 5. In the Bases, Containment Purge System (48 inch purge valves), the text was changed to delete the "no more than 200 hours per calendar year" flow path limit from the 48 inch purge valves. Is there a new limit? If a limit is no longer required, please justify.
: 5. In the Bases, Containment Purge System (48 inch purge valves), the text was changed to delete the no more than 200 hours per calendar year flow path limit from the 48 inch purge valves. Is there a new limit? If a limit is no longer required, please justify.
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1)
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1)
Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 2E-mail address: siva.lingam@nrc.gov
Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 1


Hearing Identifier: NRR_PMDA Email Number: 2587   Mail Envelope Properties   (20a5b60130aa4a5482e5c3ed8724c321)
E-mail address: siva.lingam@nrc.gov 2
 
Hearing Identifier:     NRR_PMDA Email Number:           2587 Mail Envelope Properties     (20a5b60130aa4a5482e5c3ed8724c321)


==Subject:==
==Subject:==
Diablo Canyon 1 and 2 - Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term per 10 CFR 50.67 (TAC Nos. MF6399 and MF6400)
Diablo Canyon 1 and 2 - Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term per 10 CFR 50.67 (TAC Nos. MF6399 and MF6400)
Sent Date:   1/11/2016 9:22:09 AM Received Date: 1/11/2016 9:22:00 AM From:   Lingam, Siva Created By:   Siva.Lingam@nrc.gov  
Sent Date:             1/11/2016 9:22:09 AM Received Date:         1/11/2016 9:22:00 AM From:                   Lingam, Siva Created By:             Siva.Lingam@nrc.gov Recipients:
"Pascarelli, Robert" <Robert.Pascarelli@nrc.gov>
Tracking Status: None "Dennig, Robert" <Robert.Dennig@nrc.gov>
Tracking Status: None "Bettle, Jerome" <Jerome.Bettle@nrc.gov>
Tracking Status: None "Woodyatt, Diana" <Diana.Woodyatt@nrc.gov>
Tracking Status: None
"'mjrm@pge.com'" <mjrm@pge.com>
Tracking Status: None "Thatipamala, Ramakrishna" <RNTT@pge.com>
Tracking Status: None "misf@pge.com" <misf@pge.com>
Tracking Status: None "Wright, Michael (ENG)" <MDW4@pge.com>
Tracking Status: None "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com>
Tracking Status: None Post Office:            HQPWMSMRS04.nrc.gov Files                          Size                    Date & Time MESSAGE                        2623                    1/11/2016 9:22:00 AM Options Priority:                      Standard Return Notification:            No Reply Requested:                No Sensitivity:                    Normal Expiration Date:
Recipients Received:


Recipients:    "Pascarelli, Robert" <Robert.Pascarelli@nrc.gov>  Tracking Status: None  "Dennig, Robert" <Robert.Dennig@nrc.gov>  Tracking Status: None "Bettle, Jerome" <Jerome.Bettle@nrc.gov>  Tracking Status: None  "Woodyatt, Diana" <Diana.Woodyatt@nrc.gov>
NRR-PMDAPEm Resource From:                               Lingam, Siva Sent:                               Monday, January 11, 2016 9:22 AM To:                                 Schrader, Kenneth (KJSe@pge.com)
Tracking Status: None  "'mjrm@pge.com'" <mjrm@pge.com>  Tracking Status: None "Thatipamala, Ramakrishna" <RNTT@pge.com>  Tracking Status: None  "misf@pge.com" <misf@pge.com>
Cc:                                 Pascarelli, Robert; Dennig, Robert; Bettle, Jerome; Woodyatt, Diana; 'mjrm@pge.com';
Tracking Status: None  "Wright, Michael (ENG)" <MDW4@pge.com>  Tracking Status: None  "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com>  Tracking Status: None
 
Post Office:  HQPWMSMRS04.nrc.gov Files    Size      Date & Time MESSAGE    2623      1/11/2016 9:22:00 AM Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
1 NRR-PMDAPEm Resource From:Lingam, Siva Sent: Monday, January 11, 2016 9:22 AM To: Schrader, Kenneth (KJSe@pge.com)
Cc:Pascarelli, Robert; Dennig, Robert; Bettle, Jerome; Woodyatt, Diana; 'mjrm@pge.com';
Thatipamala, Ramakrishna; misf@pge.com; Wright, Michael (ENG)
Thatipamala, Ramakrishna; misf@pge.com; Wright, Michael (ENG)


==Subject:==
==Subject:==
Diablo Canyon 1 and 2 - Requests for Addi tional Information for License Amendment Request 15-03 to Adopt the Alternative So urce Term per 10 CFR 50.67 (TAC Nos.
Diablo Canyon 1 and 2 - Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term per 10 CFR 50.67 (TAC Nos.
MF6399 and MF6400)By a letter dated June 17, 2015 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15176A539), as supplemented by letters dated August 31, October 22, November 2, November 6, and December 17, 2015 (ADAMS Accession Nos. ML15243A363, ML15295A470, ML15321A235, ML15310A522, and ML16004A363, respectively
MF6399 and MF6400)
), Pacific Gas and Electric (PG&E, the licensee), submitted a license amendment request (LAR) to revise the licensing bases to adopt the alternative source term (AST) as allowed by Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.67, "Accident source term," for Diablo Canyon Power Plant (DCPP), Units 1 and 2. Please note the following official requests for additional information (RAIs) from our Containment and Ventilation Branch (SCVB) for the AST LAR. Please provide your responses within 30 days from the date of this e-mail. We transmitted the draft RAIs to you on December 7, 2015, and we had a clarification call on January 7, 2016. Your timely responses will allow the U.S. Nuclear Regulatory Commission staff to complete its review on schedule.
By a letter dated June 17, 2015 2015 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML15176A539), as supplemented by letters dated August 31, October 22, November 2, November 6, and December 17, 2015 (ADAMS Accession Nos. ML15243A363, ML15295A470, ML15321A235, ML15310A522, and ML16004A363, respectively), Pacific Gas and Electric (PG&E, the licensee), submitted a license amendment request (LAR) to revise the licensing bases to adopt the alternative source term (AST) as allowed by Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.67, Accident source term, for Diablo Canyon Power Plant (DCPP), Units 1 and 2. Please note the following official requests for additional information (RAIs) from our Containment and Ventilation Branch (SCVB) for the AST LAR. Please provide your responses within 30 days from the date of this e-mail. We transmitted the draft RAIs to you on December 7, 2015, and we had a clarification call on January 7, 2016. Your timely responses will allow the U.S. Nuclear Regulatory Commission staff to complete its review on schedule.
: 1. Assuming 100 cfm [cubic feet per minute] damper leakage, what impact does the installed back-draft dampers have on CR ventilation analyses assumptions or unfiltered in-leakage testing methods/results?
: 1. Assuming 100 cfm [cubic feet per minute] damper leakage, what impact does the installed back-draft dampers have on CR ventilation analyses assumptions or unfiltered in-leakage testing methods/results?
: 2. Containment spray in recirculation mode following Loss-of-Coolant Accident for fission product cleanup - explain requiring operation within 12 minutes. Does this change impact any bounding containment analyses?
: 2. Containment spray in recirculation mode following Loss-of-Coolant Accident for fission product cleanup
: 3. In Surveillance Requirement (SR) 3.6.3.1, the SR direction is to verify that the 48 inch containment purge valve is sealed closed with a frequency that is in accordance with the Surveillance Frequency Control Program. What is the initial frequency? Discuss how the frequency was determined and how the frequency may change over time.
        - explain requiring operation within 12 minutes. Does this change impact any bounding containment analyses?
: 3. In Surveillance Requirement (SR) 3.6.3.1, the SR direction is to verify that the 48 inch containment purge valve is sealed closed with a frequency that is in accordance with the Surveillance Frequency Control Program. What is the initial frequency? Discuss how the frequency was determined and how the frequency may change over time.
: 4. In SR 3.6.3.7, explain the rational for the removal of the surveillance within 92 days after opening the containment purge supply and exhaust valves.
: 4. In SR 3.6.3.7, explain the rational for the removal of the surveillance within 92 days after opening the containment purge supply and exhaust valves.
: 5. In the Bases, Containment Purge System (48 inch purge valves), the text was changed to delete the "no more than 200 hours per calendar year" flow path limit from the 48 inch purge valves. Is there a new limit? If a limit is no longer required, please justify.
: 5. In the Bases, Containment Purge System (48 inch purge valves), the text was changed to delete the no more than 200 hours per calendar year flow path limit from the 48 inch purge valves. Is there a new limit? If a limit is no longer required, please justify.
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1)
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1)
Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 2E-mail address: siva.lingam@nrc.gov
Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 1


Hearing Identifier: NRR_PMDA Email Number: 2587   Mail Envelope Properties   (20a5b60130aa4a5482e5c3ed8724c321)
E-mail address: siva.lingam@nrc.gov 2
 
Hearing Identifier:     NRR_PMDA Email Number:           2587 Mail Envelope Properties     (20a5b60130aa4a5482e5c3ed8724c321)


==Subject:==
==Subject:==
Diablo Canyon 1 and 2 - Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term per 10 CFR 50.67 (TAC Nos. MF6399 and MF6400)
Diablo Canyon 1 and 2 - Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term per 10 CFR 50.67 (TAC Nos. MF6399 and MF6400)
Sent Date:   1/11/2016 9:22:09 AM Received Date: 1/11/2016 9:22:00 AM From:   Lingam, Siva Created By:   Siva.Lingam@nrc.gov  
Sent Date:             1/11/2016 9:22:09 AM Received Date:         1/11/2016 9:22:00 AM From:                   Lingam, Siva Created By:             Siva.Lingam@nrc.gov Recipients:
 
"Pascarelli, Robert" <Robert.Pascarelli@nrc.gov>
Recipients:     "Pascarelli, Robert" <Robert.Pascarelli@nrc.gov> Tracking Status: None "Dennig, Robert" <Robert.Dennig@nrc.gov> Tracking Status: None "Bettle, Jerome" <Jerome.Bettle@nrc.gov> Tracking Status: None "Woodyatt, Diana" <Diana.Woodyatt@nrc.gov>
Tracking Status: None "Dennig, Robert" <Robert.Dennig@nrc.gov>
Tracking Status: None "'mjrm@pge.com'" <mjrm@pge.com> Tracking Status: None "Thatipamala, Ramakrishna" <RNTT@pge.com> Tracking Status: None "misf@pge.com" <misf@pge.com>
Tracking Status: None "Bettle, Jerome" <Jerome.Bettle@nrc.gov>
Tracking Status: None "Wright, Michael (ENG)" <MDW4@pge.com> Tracking Status: None "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com> Tracking Status: None  
Tracking Status: None "Woodyatt, Diana" <Diana.Woodyatt@nrc.gov>
 
Tracking Status: None
Post Office:   HQPWMSMRS04.nrc.gov Files     Size     Date & Time MESSAGE   2623     1/11/2016 9:22:00 AM Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
"'mjrm@pge.com'" <mjrm@pge.com>
Tracking Status: None "Thatipamala, Ramakrishna" <RNTT@pge.com>
Tracking Status: None "misf@pge.com" <misf@pge.com>
Tracking Status: None "Wright, Michael (ENG)" <MDW4@pge.com>
Tracking Status: None "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com>
Tracking Status: None Post Office:           HQPWMSMRS04.nrc.gov Files                           Size                   Date & Time MESSAGE                         2623                   1/11/2016 9:22:00 AM Options Priority:                       Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Recipients Received:}}

Latest revision as of 07:37, 19 March 2020

NRR E-mail Capture - Diablo Canyon 1 and 2 - Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term Per 10 CFR 50.67
ML16011A317
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/11/2016
From: Siva Lingam
Plant Licensing Branch IV
To: Schrader K
PG&E Corp
References
MF6399, MF6400
Download: ML16011A317 (3)


Text

NRR-PMDAPEm Resource From: Lingam, Siva Sent: Monday, January 11, 2016 9:22 AM To: Schrader, Kenneth (KJSe@pge.com)

Cc: Pascarelli, Robert; Dennig, Robert; Bettle, Jerome; Woodyatt, Diana; 'mjrm@pge.com';

Thatipamala, Ramakrishna; misf@pge.com; Wright, Michael (ENG)

Subject:

Diablo Canyon 1 and 2 - Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term per 10 CFR 50.67 (TAC Nos.

MF6399 and MF6400)

By a letter dated June 17, 2015 2015 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML15176A539), as supplemented by letters dated August 31, October 22, November 2, November 6, and December 17, 2015 (ADAMS Accession Nos. ML15243A363, ML15295A470, ML15321A235, ML15310A522, and ML16004A363, respectively), Pacific Gas and Electric (PG&E, the licensee), submitted a license amendment request (LAR) to revise the licensing bases to adopt the alternative source term (AST) as allowed by Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.67, Accident source term, for Diablo Canyon Power Plant (DCPP), Units 1 and 2. Please note the following official requests for additional information (RAIs) from our Containment and Ventilation Branch (SCVB) for the AST LAR. Please provide your responses within 30 days from the date of this e-mail. We transmitted the draft RAIs to you on December 7, 2015, and we had a clarification call on January 7, 2016. Your timely responses will allow the U.S. Nuclear Regulatory Commission staff to complete its review on schedule.

1. Assuming 100 cfm [cubic feet per minute] damper leakage, what impact does the installed back-draft dampers have on CR ventilation analyses assumptions or unfiltered in-leakage testing methods/results?
2. Containment spray in recirculation mode following Loss-of-Coolant Accident for fission product cleanup

- explain requiring operation within 12 minutes. Does this change impact any bounding containment analyses?

3. In Surveillance Requirement (SR) 3.6.3.1, the SR direction is to verify that the 48 inch containment purge valve is sealed closed with a frequency that is in accordance with the Surveillance Frequency Control Program. What is the initial frequency? Discuss how the frequency was determined and how the frequency may change over time.
4. In SR 3.6.3.7, explain the rational for the removal of the surveillance within 92 days after opening the containment purge supply and exhaust valves.
5. In the Bases, Containment Purge System (48 inch purge valves), the text was changed to delete the no more than 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per calendar year flow path limit from the 48 inch purge valves. Is there a new limit? If a limit is no longer required, please justify.

Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1)

Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 1

E-mail address: siva.lingam@nrc.gov 2

Hearing Identifier: NRR_PMDA Email Number: 2587 Mail Envelope Properties (20a5b60130aa4a5482e5c3ed8724c321)

Subject:

Diablo Canyon 1 and 2 - Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term per 10 CFR 50.67 (TAC Nos. MF6399 and MF6400)

Sent Date: 1/11/2016 9:22:09 AM Received Date: 1/11/2016 9:22:00 AM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients:

"Pascarelli, Robert" <Robert.Pascarelli@nrc.gov>

Tracking Status: None "Dennig, Robert" <Robert.Dennig@nrc.gov>

Tracking Status: None "Bettle, Jerome" <Jerome.Bettle@nrc.gov>

Tracking Status: None "Woodyatt, Diana" <Diana.Woodyatt@nrc.gov>

Tracking Status: None

"'mjrm@pge.com'" <mjrm@pge.com>

Tracking Status: None "Thatipamala, Ramakrishna" <RNTT@pge.com>

Tracking Status: None "misf@pge.com" <misf@pge.com>

Tracking Status: None "Wright, Michael (ENG)" <MDW4@pge.com>

Tracking Status: None "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com>

Tracking Status: None Post Office: HQPWMSMRS04.nrc.gov Files Size Date & Time MESSAGE 2623 1/11/2016 9:22:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

NRR-PMDAPEm Resource From: Lingam, Siva Sent: Monday, January 11, 2016 9:22 AM To: Schrader, Kenneth (KJSe@pge.com)

Cc: Pascarelli, Robert; Dennig, Robert; Bettle, Jerome; Woodyatt, Diana; 'mjrm@pge.com';

Thatipamala, Ramakrishna; misf@pge.com; Wright, Michael (ENG)

Subject:

Diablo Canyon 1 and 2 - Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term per 10 CFR 50.67 (TAC Nos.

MF6399 and MF6400)

By a letter dated June 17, 2015 2015 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML15176A539), as supplemented by letters dated August 31, October 22, November 2, November 6, and December 17, 2015 (ADAMS Accession Nos. ML15243A363, ML15295A470, ML15321A235, ML15310A522, and ML16004A363, respectively), Pacific Gas and Electric (PG&E, the licensee), submitted a license amendment request (LAR) to revise the licensing bases to adopt the alternative source term (AST) as allowed by Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.67, Accident source term, for Diablo Canyon Power Plant (DCPP), Units 1 and 2. Please note the following official requests for additional information (RAIs) from our Containment and Ventilation Branch (SCVB) for the AST LAR. Please provide your responses within 30 days from the date of this e-mail. We transmitted the draft RAIs to you on December 7, 2015, and we had a clarification call on January 7, 2016. Your timely responses will allow the U.S. Nuclear Regulatory Commission staff to complete its review on schedule.

1. Assuming 100 cfm [cubic feet per minute] damper leakage, what impact does the installed back-draft dampers have on CR ventilation analyses assumptions or unfiltered in-leakage testing methods/results?
2. Containment spray in recirculation mode following Loss-of-Coolant Accident for fission product cleanup

- explain requiring operation within 12 minutes. Does this change impact any bounding containment analyses?

3. In Surveillance Requirement (SR) 3.6.3.1, the SR direction is to verify that the 48 inch containment purge valve is sealed closed with a frequency that is in accordance with the Surveillance Frequency Control Program. What is the initial frequency? Discuss how the frequency was determined and how the frequency may change over time.
4. In SR 3.6.3.7, explain the rational for the removal of the surveillance within 92 days after opening the containment purge supply and exhaust valves.
5. In the Bases, Containment Purge System (48 inch purge valves), the text was changed to delete the no more than 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per calendar year flow path limit from the 48 inch purge valves. Is there a new limit? If a limit is no longer required, please justify.

Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1)

Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 1

E-mail address: siva.lingam@nrc.gov 2

Hearing Identifier: NRR_PMDA Email Number: 2587 Mail Envelope Properties (20a5b60130aa4a5482e5c3ed8724c321)

Subject:

Diablo Canyon 1 and 2 - Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term per 10 CFR 50.67 (TAC Nos. MF6399 and MF6400)

Sent Date: 1/11/2016 9:22:09 AM Received Date: 1/11/2016 9:22:00 AM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients:

"Pascarelli, Robert" <Robert.Pascarelli@nrc.gov>

Tracking Status: None "Dennig, Robert" <Robert.Dennig@nrc.gov>

Tracking Status: None "Bettle, Jerome" <Jerome.Bettle@nrc.gov>

Tracking Status: None "Woodyatt, Diana" <Diana.Woodyatt@nrc.gov>

Tracking Status: None

"'mjrm@pge.com'" <mjrm@pge.com>

Tracking Status: None "Thatipamala, Ramakrishna" <RNTT@pge.com>

Tracking Status: None "misf@pge.com" <misf@pge.com>

Tracking Status: None "Wright, Michael (ENG)" <MDW4@pge.com>

Tracking Status: None "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com>

Tracking Status: None Post Office: HQPWMSMRS04.nrc.gov Files Size Date & Time MESSAGE 2623 1/11/2016 9:22:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: