| number = ML060410115
| number = ML060410115
| issue date = 01/31/2006
| issue date = 01/31/2006
| title = Millstone Power Station Units 2 & 3 Technical Specifications Annual Operating Reports for 2005
| title = Technical Specifications Annual Operating Reports for 2005
| author name = Price J A
| author name = Price J
| author affiliation = Dominion Nuclear Connecticut, Inc
| author affiliation = Dominion Nuclear Connecticut, Inc
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter::;FDominion Dominion Nudear Connecticut, Inc.Millstone Power Station Rope Ferry Road Waterford, CT 06385 U.S. Nuclear Regulatory Commission Attention:
{{#Wiki_filter:Dominion Nudear Connecticut, Inc.
Document Control Desk Washington, DC 20555 AN 31 Serial No.MPS Lic/MAE Docket Nos.06-060 RO 50-336 50-423 DPR-65 NPF-49 License Nos.DOMINION NUCLEAR CONNECTICUT, INC.MILLSTONE POWER STATION UNITS 2 AND 3 TECHNICAL SPECIFICATIONS ANNUAL REPORT Pursuant to the provisions of Millstone Unit 2 and Millstone Unit 3 Technical Specifications (TS), Dominion Nuclear Connecticut, Inc (DNC) is submitting the annual reports described below. These annual reports cover unit activities for the period January 1, 2005, to December 31, 2005.Millstone Unit 2: The Millstone Unit 2 activities provided in this report are covered by Section 6.9.1.4,"Annual Reports" as supplemented by Sections 6.9.1.5b and 5c. Details of these activities are as follows:* The results of the steam generator tube inservice inspections performed at Millstone Unit 2 in 2005 are included as Enclosure 1 in accordance with Millstone Unit 2 TS 6.9.1.5b.* There were no exceedances of Technical Specification 3.4.8 at Millstone Unit 2 in 2005; therefore, there is no report to be made on reactor coolant specific activity analysis in accordance with Millstone Unit 2 TS 6.9.1.5c.Millstone Unit 3: The Millstone Unit 3 activities provided in this report are covered by Section 6.9.1.2,"Annual Reports." Details of these activities are as follows:* There were no exceedances of Technical Specification 3.4.8 at Millstone Unit 3 in 2005; therefore, there is no report to be made on reactor coolant specific activity analysis in accordance with Millstone Unit 3 TS 6.9.1.2.b.
Millstone Power Station                                           :;FDominion Rope Ferry Road Waterford, CT 06385 AN31 U.S. Nuclear Regulatory Commission                                   Serial No.      06-060 Attention: Document Control Desk                                     MPS Lic/MAE      RO Washington, DC 20555                                                 Docket Nos.     50-336 50-423 License Nos. DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.
Serial No. 06-060 Technical Specifications Annual report Page 2 of 3 There are no regulatory commitments contained within this letter.If you have any questions or require additional information, please contact Mr. David W.Dodson at (860) 447-1791, extension 2346.Very truly yours, ice nPrice t/ice President  
MILLSTONE POWER STATION UNITS 2 AND 3 TECHNICAL SPECIFICATIONS ANNUAL REPORT Pursuant to the provisions of Millstone Unit 2 and Millstone Unit 3 Technical Specifications (TS), Dominion Nuclear Connecticut, Inc (DNC) is submitting the annual reports described below. These annual reports cover unit activities for the period January 1, 2005, to December 31, 2005.
-Millstone Serial No. 06-060 Technical Specifications Annual report Page 3 of 3  
Millstone Unit 2:
The Millstone Unit 2 activities provided in this report are covered by Section 6.9.1.4, "Annual Reports" as supplemented by Sections 6.9.1.5b and 5c. Details of these activities are as follows:
* The results of the steam generator tube inservice inspections performed at Millstone Unit 2 in 2005 are included as Enclosure 1 in accordance with Millstone Unit 2 TS 6.9.1.5b.
* There were no exceedances of Technical Specification 3.4.8 at Millstone Unit 2 in 2005; therefore, there is no report to be made on reactor coolant specific activity analysis in accordance with Millstone Unit 2 TS 6.9.1.5c.
Millstone Unit 3:
The Millstone Unit 3 activities provided in this report are covered by Section 6.9.1.2, "Annual Reports." Details of these activities are as follows:
* There were no exceedances of Technical Specification 3.4.8 at Millstone Unit 3 in 2005; therefore, there is no report to be made on reactor coolant specific activity analysis in accordance with Millstone Unit 3 TS 6.9.1.2.b.
 
Serial No. 06-060 Technical Specifications Annual report Page 2 of 3 There are no regulatory commitments contained within this letter.
If you have any questions or require additional information, please contact Mr. David W.
Dodson at (860) 447-1791, extension 2346.
Very truly yours, icenPrice t/ice President - Millstone
 
Serial No. 06-060 Technical Specifications Annual report Page 3 of 3


==Enclosures:==
==Enclosures:==
(0)
Commitments made in this letter: None.
cc:  U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8C2 Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station Mr. R. Prince NRC Inspector U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415
Enclosure 1 Millstone Unit 2 2005 Steam Generator Tube Inservice Inspection Millstone Power Station Unit 2 Dominion Nuclear Connecticut, Inc. (DNC)


(0)Commitments made in this letter: None.cc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8C2 Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station Mr. R. Prince NRC Inspector U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Enclosure 1 Millstone Unit 2 2005 Steam Generator Tube Inservice Inspection Millstone Power Station Unit 2 Dominion Nuclear Connecticut, Inc. (DNC)
Serial No. 06-060 Page 1 Steam Generator Tube Inspection Millstone Unit 2 (MP2) is a two loop ABB-CE PWR with Babcock and Wilcox (B&W) replacement Steam Generators (SG). Each SG was designed to contain 8523 U-bend thermally treated Inconel 690 tubes. One hot leg tube sheet hole in SG 1 was plugged during construction and the opposing cold leg hole was not drilled, thus SG 1 has 8522 tubes. The tubing is nominally 0.750 inch outside diameter with a 0.0445 inch nominal wall thickness. During replacement SG fabrication, the tubes were installed using a two-step hydraulic expansion process over the full depth of the 21.06 inch thick tubesheet. The tubesheet was drilled on a triangular pitch with 1.0 inch spacing. There are 141 rows and 167 columns in each SG. To minimize small radius U-bends, tubes in rows 1 through 3 were installed using a staggered arrangement. This resulted in the termination of tubes at different locations between the hot and cold legs. For these rows, the tube identification follows the hot leg row/column naming convention.
Serial No. 06-060 Page 1 Steam Generator Tube Inspection Millstone Unit 2 (MP2) is a two loop ABB-CE PWR with Babcock and Wilcox (B&W)replacement Steam Generators (SG). Each SG was designed to contain 8523 U-bend thermally treated Inconel 690 tubes. One hot leg tube sheet hole in SG 1 was plugged during construction and the opposing cold leg hole was not drilled, thus SG 1 has 8522 tubes. The tubing is nominally 0.750 inch outside diameter with a 0.0445 inch nominal wall thickness.
Secondary side tube support structures include seven lattice grid supports on the vertical section of the tubes and twelve fan bar assemblies on the U-bend section of the tubes. All lattice grid supports are full supports.
During replacement SG fabrication, the tubes were installed using a two-step hydraulic expansion process over the full depth of the 21.06 inch thick tubesheet.
SG replacement was completed during 2R1 1 (Fall 1992). The new SGs have accrued 7.037 Effective Full Power Years (EFPY) of operation as of the end of Cycle 16 (April 2005). The 910 MW Unit operates with a hot leg temperature of 601 degrees Fahrenheit.
The tubesheet was drilled on a triangular pitch with 1.0 inch spacing. There are 141 rows and 167 columns in each SG. To minimize small radius U-bends, tubes in rows 1 through 3 were installed using a staggered arrangement.
This resulted in the termination of tubes at different locations between the hot and cold legs. For these rows, the tube identification follows the hot leg row/column naming convention.
Secondary side tube support structures include seven lattice grid supports on the vertical section of the tubes and twelve fan bar assemblies on the U-bend section of the tubes. All lattice grid supports are full supports.SG replacement was completed during 2R1 1 (Fall 1992). The new SGs have accrued 7.037 Effective Full Power Years (EFPY) of operation as of the end of Cycle 16 (April 2005). The 910 MW Unit operates with a hot leg temperature of 601 degrees Fahrenheit.
The Millstone Unit 2 SG eddy current testing (ECT), conducted at the end of Cycle 16, was completed on April 25, 2005. The examinations, personnel, and equipment conformed to the requirements of NEI 97-06, rev. 1, Steam Generator Program Guidelines; EPRI Pressurized Water Reactor Steam Generator Examination Guidelines:
The Millstone Unit 2 SG eddy current testing (ECT), conducted at the end of Cycle 16, was completed on April 25, 2005. The examinations, personnel, and equipment conformed to the requirements of NEI 97-06, rev. 1, Steam Generator Program Guidelines; EPRI Pressurized Water Reactor Steam Generator Examination Guidelines:
Revision 6; and Millstone Unit 2 Technical Specifications.
Revision 6; and Millstone Unit 2 Technical Specifications. Performed in SG 1 only, the inspection included a 100% bobbin coil exam and 298 special interest and diagnostic exams utilizing Motorized Rotating Pancake Coil (MRPC) technology. The only indications of degradation recorded were attributed to mechanically induced wear. ECT identified two tubes with nine (9) percent throughwall fan bar wear, unchanged from the 2R14 results. No tubes were removed from service or otherwise repaired.
Performed in SG 1 only, the inspection included a 100% bobbin coil exam and 298 special interest and diagnostic exams utilizing Motorized Rotating Pancake Coil (MRPC) technology.
One hundred percent (100%) of all in-service tubes (8522 tubes) in SG 1 were examined full length with the standard bobbin coil technique. The tubes were examined tube end to tube end (TEC-TEH) from the hot leg channel head.
The only indications of degradation recorded were attributed to mechanically induced wear. ECT identified two tubes with nine (9) percent throughwall fan bar wear, unchanged from the 2R14 results. No tubes were removed from service or otherwise repaired.One hundred percent (100%) of all in-service tubes (8522 tubes) in SG 1 were examined full length with the standard bobbin coil technique.
Two hundred ninety-eight (298) tubes were examined with the MRPC plus-point probe; one hundred forty-two (142) hot-leg roll transition exams and one hundred fifty-six (156) special interest and diagnostic examinations. MRPC examination locations are summarized below and in Table 2.
The tubes were examined tube end to tube end (TEC-TEH) from the hot leg channel head.Two hundred ninety-eight (298) tubes were examined with the MRPC plus-point probe;one hundred forty-two (142) hot-leg roll transition exams and one hundred fifty-six (156)special interest and diagnostic examinations.
The extent for the roll transition area examination was top of tube sheet hot (TSH) +3/-3 inches. This area was selected based on the historical hot leg sludge pile region as compiled from previous SG 1 and SG 2 (2R13, 2R14, and 2R15) results. The 142 tube
MRPC examination locations are summarized below and in Table 2.The extent for the roll transition area examination was top of tube sheet hot (TSH) +3/-3 inches. This area was selected based on the historical hot leg sludge pile region as compiled from previous SG 1 and SG 2 (2R13, 2R14, and 2R15) results. The 142 tube Serial No. 06-060 Page 2 locations selected for examination make up fifty percent (50%) of this total sludge region (284 tubes) identified from both SGs. Approximately seventy-four (74%) of the tubes in the sample had previously identified Sludge (SLG) indications in SG 1. SLG indications reported during the current inspection are mapped in Attachment  
 
: 5. One tube with a historical Partial Tubesheet Expansion (PTE) indication was also examined TSH-TEH.One hundred and fifty-six (156) tubes were examined at a specific area of interest.
Serial No. 06-060 Page 2 locations selected for examination make up fifty percent (50%) of this total sludge region (284 tubes) identified from both SGs. Approximately seventy-four (74%) of the tubes in the sample had previously identified Sludge (SLG) indications in SG 1. SLG indications reported during the current inspection are mapped in Attachment 5. One tube with a historical Partial Tubesheet Expansion (PTE) indication was also examined TSH-TEH.
The sixty-three (63) preplanned examinations were conducted at locations of previously identified dents, dings, bulges, possible loose parts, over expansions, and fan bar wear.Ninety-three (93) diagnostic examinations were conducted at locations associated with indications reported during the current inspection.
One hundred and fifty-six (156) tubes were examined at a specific area of interest. The sixty-three (63) preplanned examinations were conducted at locations of previously identified dents, dings, bulges, possible loose parts, over expansions, and fan bar wear.
These included dents, dings, bobbin I-codes, possible loose parts, and tubes surrounding possible or known loose parts.This ECT examination was conducted following five cycles (7.037 EFPY) of operation with the replacement SGs. There were no indications of any corrosion related tube cracking.ECT reported two (2) tubes with nine (9) percent throughwall  
Ninety-three (93) diagnostic examinations were conducted at locations associated with indications reported during the current inspection. These included dents, dings, bobbin I-codes, possible loose parts, and tubes surrounding possible or known loose parts.
(%TW) fan bar wear. The ECT results from 2R14 also reported 9%TW wear on these tubes, thus the wear has not progressed over the past two operating cycles. Additional details on fan bar wear in both SGs are provided in Table 3 and Attachment 6.One Volumetric Indication (VOL) was reported.
This ECT examination was conducted following five cycles (7.037 EFPY) of operation with the replacement SGs. There were no indications of any corrosion related tube cracking.
This VOL indication has been reported since the June 1997 examination with MRPC. It is believed to be associated with a Manufacturing Buff Mark (MBM) and exhibits no change since first reported.
ECT reported two (2) tubes with nine (9) percent throughwall (%TW) fan bar wear. The ECT results from 2R14 also reported 9%TW wear on these tubes, thus the wear has not progressed over the past two operating cycles. Additional details on fan bar wear in both SGs are provided in Table 3 and Attachment 6.
Additional details are provided in Attachment 7.Twenty-five (25) PLP indications were also reported.
One Volumetric Indication (VOL) was reported. This VOL indication has been reported since the June 1997 examination with MRPC. It is believed to be associated with a Manufacturing Buff Mark (MBM) and exhibits no change since first reported. Additional details are provided in Attachment 7.
These ECT reported indications were grouped in eleven (11) locations as shown in Attachment  
Twenty-five (25) PLP indications were also reported. These ECT reported indications were grouped in eleven (11) locations as shown in Attachment 4. Seventeen (17) of the indications were initially reported with the bobbin coil examination and eight (8) with the MRPC examination.       Loose parts were observed in an additional three (3) locations during SSI. There were no indications of wear associated with any of the PLP indications or any of the loose parts that were reported. Additional information is included in Table 4.
: 4. Seventeen (17) of the indications were initially reported with the bobbin coil examination and eight (8) with the MRPC examination.
Although no primary side ECT was performed, SSI reported thirteen (13) loose parts in SG 2. Nine (9) were removed. Three (3) pieces of Flexitallic gasket and one (1) sludge rock remain wedged between tubes. No wear associated with any of the loose parts in SG 2 was reported during the performance of the visual examination.
Loose parts were observed in an additional three (3) locations during SSI. There were no indications of wear associated with any of the PLP indications or any of the loose parts that were reported.
In summary, 100% of the tubes in SG 1 (8522 tubes) were inspected, TEC-TEH. There were no tubes that required repair as a result of this examination. No tubes were plugged or otherwise repaired on a discretionary basis. As a result of the inspection, SG 1 was classified as C-1. A listing and map of tubes reported with wall-thickness loss is included in Attachment 6. The maximum wall-thickness loss was 9% TW.
Additional information is included in Table 4.Although no primary side ECT was performed, SSI reported thirteen (13) loose parts in SG 2. Nine (9) were removed. Three (3) pieces of Flexitallic gasket and one (1) sludge rock remain wedged between tubes. No wear associated with any of the loose parts in SG 2 was reported during the performance of the visual examination.
 
In summary, 100% of the tubes in SG 1 (8522 tubes) were inspected, TEC-TEH. There were no tubes that required repair as a result of this examination.
Serial No. 06-060 Page 3 Table 1 - Eddy Current Results I     SG I Number of Tubes                                                     8522 Number of Tubes Inspected full length w/Bobbin Probe               8522 Number of Tube Inspections w/MRPC (Total)                           298
No tubes were plugged or otherwise repaired on a discretionary basis. As a result of the inspection, SG 1 was classified as C-1. A listing and map of tubes reported with wall-thickness loss is included in Attachment  
* Hot Leg Transitions - Original Scope                               142
: 6. The maximum wall-thickness loss was 9% TW.
* Hot Leg Misc. Special Interest - Diagnostic Exams                 60
Serial No. 06-060 Page 3 Table 1 -Eddy Current Results I SG I Number of Tubes 8522 Number of Tubes Inspected full length w/Bobbin Probe 8522 Number of Tube Inspections w/MRPC (Total) 298* Hot Leg Transitions  
* Cold Leg Misc. Special Interest - Diagnostic Exams                 82
-Original Scope 142* Hot Leg Misc. Special Interest -Diagnostic Exams 60* Cold Leg Misc. Special Interest -Diagnostic Exams 82* U-bend Misc. Special Interest -Diagnostic Exams (tubes) 14 Tubes with Max Fan Bar Wear >= 40% 0 Tubes with Max Fan Bar Wear >= 20% but < 40% 0 Tubes with Max Fan Bar Wear <20% 2 Tubes Plugged 0 Tubes Sleeved 0 Serial No. 06-060 Page 4 Table 2 -MRPC Examinations Hot Leg Cold Leg U-bend Previous PTE 1 0 0 Indications
* U-bend Misc. Special Interest - Diagnostic Exams (tubes)           14 Tubes with Max Fan Bar Wear >= 40%                                   0 Tubes with Max Fan Bar Wear >= 20% but < 40%                         0 Tubes with Max Fan Bar Wear <20%                                     2 Tubes Plugged                                                         0 Tubes Sleeved                                                         0
_PLP 2 4 0 DNT/DNG 3 9 8 BLG 2 0 0 OXP 19 14 0 Fan Bar Wear 0 0 1 2R16 Bobbin I-Codes 3 0 2 Indications Bobbin PLPs 3 8 0 PLP Bounding & 27 46 0 Resulting PLPs _DNT/DNG 0 1 3 Total 60 82 14 Table 3 -Fan Bar Wear Ro Col SG % TW Support Inch from Support Identifie w Identifier Center d 40 155 1 9 F06 -1.74 2R14 9 F06 -1.66 2R16 140 93 1 9 F08 -0.55 2R14 1 9 F08 -0.53 2R16 37 120 2 6 F07 -0.81 2R15 99 80 2 11 F06 1.26 2R15 Serial No. 06-060 Page 5 Table 4- Loose Parts Summary SG Location Description Method of Removed Discovery I R89 C26 Small metal turning wedged between tubes. ECT No R91 C26 PLP indications evident in this area in 02, 97, R88 C27 and 94. No wear was reported.R87 C28 TSC+0.4" 1 R26 C165 Sludge rock located between tubes. PLP ECT No R28 C165 indications evident in 02, 97, and 94. No TSC+5.5" wear was reported.1 R41 C160 Short piece of wire or Flexitallic gasket. PLP ECT No R42 C159 indications evident in 02. No wear was R40 C159 reported.R43 C158 R41 C158 TSH+0.8" I R45 C162 Sludge rock located between tubes. PLP ECT No R47 C162 evident in 02, 97, and 94. No wear was TSC+9.6" reported.I R127 C50 Sludge formation between tubes. No wear ECT Yes R128 C51 was reported.
 
No PLP reported via ECT for TSC+9.8" R128 C51.1 R140 C77 Weld slag lying on tube sheet between Visual Yes RI 39 C78 tubes. No wear was reported.
Serial No. 06-060 Page 4 Table 2 - MRPC Examinations Hot Leg   Cold Leg     U-bend Previous   PTE                         1         0           0 Indications                                 _
No PLP R140 C79 reported via ECT for R140 C77 or R140 C79.TSC 1 R28 C99 Demineralizer outlet strainer screen fragment Visual No R29 C98 lodged between tubes and on the tube sheet.TSC No wear was reported.
PLP                        2         4           0 DNT/DNG                     3         9           8 BLG                         2         0           0 OXP                       19       14           0 Fan Bar Wear               0         0           1 2R16     Bobbin I-Codes             3         0           2 Indications Bobbin PLPs                 3         8           0 PLP Bounding &             27       46           0 Resulting PLPs     _
No PLP was reported via ECT.1 R127 C120 3" long metal clip lying in the periphery on Visual Yes R126 C123 the tubesheet adjacent to the listed tubes.R125 C122 No wear was reported.
DNT/DNG                     0         1           3 Total                     60       82         14 Table 3 - Fan Bar Wear Ro Col     SG     % TW             Support       Inch from Support       Identifie w                                 Identifier           Center                 d 40 155     1       9               F06                 -1.74               2R14 9               F06                 -1.66               2R16 140 93     1         9               F08                 -0.55               2R14 1           9               F08                 -0.53               2R16 37 120     2       6               F07                 -0.81               2R15 99   80     2       11               F06                 1.26               2R15
No PLP was TSH reported via ECT.I RI 39 C70 Approximately 20 wire brush bristles lying on Visual Yes TSH the tube sheet and adjacent to the tube. No wear was reported.
 
No PLP was reported via ECT.1 RI 30 C57 Sludge formation wedged between tubes. ECT No RI 31 C56 No wear was reported.R132 C57 TSC+5.3" Serial No.06-060 Page 6 SG Location Description Method of Removed Discovery 1 R16 C1 Sludge formation lodged between tubes. No ECT Yes R14 Cl wear was reported.TSH+10.8" 1 R96 C33 PLP previously reported in 02. No wear was ECT No TSH+2.0" reported.
Serial No. 06-060 Page 5 Table 4- Loose Parts Summary SG   Location                   Description                   Method of     Removed Discovery I   R89 C26 Small metal turning wedged between tubes.         ECT             No R91 C26 PLP indications evident in this area in 02, 97, R88 C27 and 94. No wear was reported.
Loose part was not observed visually.1 R94 C33 PLP previously reported in 02. No wear was ECT No TSH+2.0" reported.
R87 C28 TSC+0.4" 1 R26 C165 Sludge rock located between tubes. PLP             ECT             No R28 C165 indications evident in 02, 97, and 94. No TSC+5.5" wear was reported.
Loose part was not observed visually.1 R23 C102 Weld slag previously identified in 03 and 02. Visual No R24 C103 No wear was detected.R24 C101 TSC+1.0" 2 R30 C97 Cold staywell.
1 R41 C160 Short piece of wire or Flexitallic gasket. PLP     ECT             No R42 C159 indications evident in 02. No wear was R40 C159 reported.
Sludge rock wedged between Visual No R31 C96 tubes. No wear was observed.R32 C97 2 R1 37 C102 Hot periphery.
R43 C158 R41 C158 TSH+0.8" I R45 C162 Sludge rock located between tubes. PLP             ECT           No R47 C162 evident in 02, 97, and 94. No wear was TSC+9.6" reported.
Flexitallic gasket metallic Visual Yes R136 C103 piece. No wear was observed.R134 C103 2 R1 38 C80 Hot periphery.
I   R127 C50 Sludge formation between tubes. No wear             ECT           Yes R128 C51 was reported. No PLP reported via ECT for TSC+9.8" R128 C51.
Flexitallic gasket metallic Visual Yes R1 38 C81 piece. No wear was observed.R140 C81 R139 C82 R141 C82 R141 C84 R137 C80 R140 C83 2 R1 39 C70 Hot periphery.
1 R140 C77 Weld slag lying on tube sheet between             Visual         Yes RI 39 C78 tubes. No wear was reported. No PLP R140 C79 reported via ECT for R140 C77 or R140 C79.
Demineralizer outlet strainer Visual Yes screen fragment.
TSC 1   R28 C99 Demineralizer outlet strainer screen fragment     Visual         No R29 C98 lodged between tubes and on the tube sheet.
No wear was observed.2 R127 C50 Hot periphery.
TSC   No wear was reported. No PLP was reported via ECT.
Flexitallic gasket metallic Visual No R1 26 C49 piece. No wear was observed.R127 C48 R125 C50 2 R1 39 C72 Hot periphery.
1 R127 C120 3" long metal clip lying in the periphery on       Visual         Yes R126 C123 the tubesheet adjacent to the listed tubes.
Flexitallic gasket metallic Visual No R138 C73 piece. No wear was observed.2 R1 41 C88 Weld wire. Cold Periphery.
R125 C122 No wear was reported. No PLP was TSH   reported via ECT.
No wear was Visual Yes R141 C86 observed R141 C84 2 R37 C80 Cold staywell.  
I RI 39 C70 Approximately 20 wire brush bristles lying on     Visual         Yes TSH   the tube sheet and adjacent to the tube. No wear was reported. No PLP was reported via ECT.
.Flexitallic gasket metallic Visual No R39 C80 piece. No wear was observed.R37 C82 R38 C81 R39 C82 Serial No.06-060 Page 7 SG Location Description Method of Removed Discovery 2 Cold annulus near RIOO C25. Piece of wire. Visual Yes No contact with any tubes. No wear observed.2 No-tube lane near R4 C1. Flat head screw. Visual Yes No contact with any tubes. No wear observed.2 No-tube lane near R4 C1. Metal turning. No Visual Yes contact with any tubes. No wear observed.2 Cold annulus near R140 C85. Demineralizer Visual Yes outlet strainer screen fragment.
1 RI 30 C57 Sludge formation wedged between tubes.             ECT           No RI 31 C56 No wear was reported.
No contact with any tubes. No wear observed.
R132 C57 TSC+5.3"
Serial No. 06-060 Page 8 Attachments Attachment 1 2 3 4 5 6 7 Title Acronyms Tube Sheet Map and Listing -DNG Indications Tube Sheet Map and Listing -DNT Indications Tube Sheet Map and Listing -PLP Indications Tube Sheet Map and Listing -SLG Indications Tube Sheet Map and Listing -% TW FB Indications Tube Sheet Map and Listing -VOL Indications Serial No. 06-060 Page 9 Attachment I Acronyms B&W Babcock & Wilcox BLG Bulge C Column DNG Ding DNT Dent ECT Eddy Current Testing EFPY Effective Full Power Years FB Fan Bar MP 2 Millstone Unit 2 MRPC Motorized Rotating Pancake Coil OXP Over Expansion PLP Possible Loose Part PTE Partial Tubesheet Expansion% TW Percent Throughwall R Row SG 1 Steam Generator Number 1 SG 2 Steam Generator Number 2 SLG Sludge SSI Secondary Side Inspection TEC Tube End Cold-leg TEH Tube End Hot-leg TSC Top of Tube Sheet Cold-leg TSH Top of Tube Sheet Hot-leg VOL Volumetric Indication Serial No. 06-060 Page 10 Attachment 2 DNG Indications Millstone Unit 2 i1 GROUP B DNG Indications TLUBES 12 Millstone Unit 2 04/05 -2R16 DNG Indications S/G 1 HOT PRIMARY FACE TOTAL TUBES: 8523 SELECTED TUBES: 12 OUT OF SERVICE (#): I SCALE: 0.066571 X Fri May 27 08:42:51 2005 I l IJIIII Z L 011 fIJI -fl NOZZLE 00eg.mr& " 000000200 oemo,!60 130_^,I 0.0 0 2~130 28RoA 120 120_^110: 110 100 100 90 90 80 80 70 -, 0 0 00 40)300 000 50 1 000 70 MANWAY O- 60 0 s~0o 40 0--10._ _ _ _ _ _ _ _ _-_- _ _-_-_ _7 ----_30 20-10 I J 10 I I 20 30 40 50 W 110 I ,- ---v-W- --------- w I I I 1 10040350140 160 160 Framatome ANP Inc.Customer Name: Millstone Unit 2 5/26/2005 4:30:43 PM Component:
 
S/G I Pace I of I DNG Indications QUERY: DNG Indications ROW COL VOLTS DEG 20 61 4.26 184 20 63 4.36 184 21 104 5.47 185 25 64 6.59 183 29 34 2.71 188 57 158 5.05 186 59 42 2.81 184 69 72 4.02 187 103 32 3.19 186 114 99 4.26 186 132 55 4.89 185 136 63 4.18 184 CHN IND 1 DNG 1 DNG 1 DNG 1 DNG 1 DNG 1 DUG 1 DNG 1 DNG 1 DNG 1 DNG 1 DNG 1 DNG%TW LOCATION EXT EXT UTIL 1 UTIL 2=== = = _= = = = ==== =======Fol +12.29 TEC TER HR F07 +5.18 TEC TEE HR F01 +7.10 TEC TER HR F06 +2.22 TEC TEH HR 01H +20.24 TEC TEE HR F06 +5.69 TEC TEH HR TSC +14.91 TEC TEE HR 04C +28.11 TEC TER HR 06C +19.94 TEC TER HR 02H +33.86 TEC TER HR TSC +0.61 TEC TEE HR F02 +3.80 TEC TER HR CAL # LEG PROBE 32 HOT 61OUL 31 HOT 61OUL 25 HOT 61OUL 32 HOT 61OUL 8 HOT 61OUL 68 HOT 61OUL 5 HOT 610UL 32 HOT 61OUL 4 HOT 61oUL 22 HOT 61OUL 13 HOT 61OUL 14 HOT 61OUL Total Tubes : 12 Total Records: 12 Serial No. 06-060 Page 1 1 Attachment 3 DNT Indications Millstone Unit 2 GROUP B DNT Indications A TUBES 13 Millstone Unit 2 04/05 -2R16 DNT Indications FANP -0Mm fnOp mwdue Valon 3.2 S/G 1 HOT PRIMARY FACE TOTAL TUBES: 8523 SELECTED TUBES: 13 OUT OF SERVICE (#): I SCALE: 0.066571 X Fri May 27 08:44:22 2005 mu-Iunm; I ~1 anor NOZZLE-4-120 0 e2e6egeg0geg~RW,-0110 130 130 120, 120 n4 110 -0(0 08jj 110 100 100.b' 0 go9 90 80 80 70 70 MANWAY 60 60 50 50 40 7 40 30 ---0 --- ---8 -----------30 20 10 --_ 70 --00 20-------10 O.Io 20 I 110 120 I I 30 40 50 60 130 140 ISO ISO Framatome ANP Inc. 5/26/2005 4:31:17 PM Customer Name: Millstone Unit 2 Component:
Serial No. 06-060 Page 6 SG Location                   Description                 Method of     Removed Discovery 1   R16 C1   Sludge formation lodged between tubes. No       ECT           Yes R14 Cl   wear was reported.
S/G 1 Page 1 of 1 DNT Indications QUERY: DNT Indications ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL I LEG PROBE 16 167 3.11 177 P 1 DNT 07H +0.68 TEC TEH HR 66 HOT 61OUL 20 61 4.26 178 P 1 DNT F07 -0.40 TEC TER HR 32 HOT 61OUL 20 63 3.77 179 P 1 DNT F06 +1.97 TEC TEH HR LAR 31 HOT 610UL 37 108 3.98 180 P 1 DNT F06 +0.56 TEC TER HR 28 HOT 610UL 48 129 2.98 184 P 1 DNT F05 +0.33 TEC TER HR 63 HOT 610UL 49 106 3.33 181 P 1 DNT 07C +1.74 TEC TEH HR 28 HOT 61OUL 60 113 3.86 182 P 1 DNT 07C +1.61 TEC TEH HR 28 HOT 610UL 85 42 2.36 180 P 1 DNT 07C +1.68 TEC TEH HR 2 HOT 61OUL 87 52 3.69 183 P 1 DNT 07C +1.67 TEC TER HR 13 HOT 61OUL 92 53 3.16 179 P 1 DNT 07C +1.49 TEC TER HR 14 HOT 610UL 92 91 4.01 175 P 1 DNT 07H +1.40 TEC TEH HR 20 HOT 610UL 108 51 3.64 181 P 1 DNT 07C +1.55 TEC TEH HR 13 HOT 61OUL 113 70 3.24 178 P 1 DNT 07C +1.20 TEC TEH HR 16 HOT 610UL Total Tubes : 13 Total Records: 13/
TSH+10.8" 1 R96 C33   PLP previously reported in 02. No wear was       ECT             No TSH+2.0" reported. Loose part was not observed visually.
Serial No. 06-060 Page 12 Attachment 4 PLP Indications lIl Millstone Unit 2 GROUP B PLP Indications TUBES 25 Millstone Unit 2 04/05 -2R16 PLP Indications S/G 1 HOT PRIMARY FACE TOTAL TUBES: 8523 SELECTED TUBES: 25 OUT OF SERVICE (#): NA SCALE: 0.066571 X Fri May 27 08:51:04 2005....I HO o jUT..I NOZZLE WntI A 130 130 120 120 110 110 100 100 90 90 60 50 40 0 000 30 -'20 10 o-08 1. -8 go00o 2 -0 0~4 J ~ ~ 8 8 8 0 8 8g 8 1 f8 o 1 8o 0 0 0 0 8 80 o 8 ! 1 g 70 M A N W A Y o0 ~ ~ o 8 ~ ~ ~ 8&sect; g g ~ s 8 8 8 8 8 ~ 8 8 8 o o 0 0 0 2 8 , Ie& ~ 8 ~ ~ ~ e ~ g g g ~ ~ ~ 8 8 8 -&sect;0 ~ 8 8 8 0 ~ ~ 0 0 0 0 0 0 8 o-A , -s8o8 0 0 0 0 0 0 0 8 8 8 8 8 8 8 8 0 8 8 8 8 o o o o 8 8 ~ 8 8 8 0 0 0 8 0 8 0 8 0 0 8 8 8 8 8 ~ 8 8 8 08 8 0 8 0 8 0808800 ~o80800 0080080 o 8~o~~o8 oOOO 000~ 0 % ~0 &0 ~ ~ ~ 840 80 .90-30 20 100 10 I I 110 10 20 30 40 50 60 120 130 140 150 160 Framatome ANP Inc.Customer Name: Millstone Unit 2 5/26/2005 4:34:46 PM C n S/Gf 1 Page 1 of 1 PLP Indications (including any LPI LPM LPR LPS Indications)
1 R94 C33   PLP previously reported in 02. No wear was       ECT             No TSH+2.0" reported. Loose part was not observed visually.
QUERY: PLP Indications I .ROW 14 16 23 24 24 25 26 28 40 41 41 42 43 45 47 87 88 89 91: 94 96 127 !130 'K 131 '139 COL VOLTS 1 0.29 1 0.29 102 1.05 0.60 101 0.47 2.78 103 0.77 0.60 102 1.15 0.63 165 0.30 0.35 165 0.26 0.31 159 0.37 158 0.28 160 0.31 0.26 159 0.16 158 0.32 162 0.45 0.81 162 0.34 0.70 28 0.20 27 0.19 26 0.14 26 0.21 33 0.29 0.11 33 0.24 0.22 50 0.43 57 0.28 0.36 56 0.11 0.10 78 0.23 DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2_ _ _ = = _ _ =====183 212 45 78 78 189 35 77 42 77 78 34 82 218 87 88 89 72 91 83 78 219 80 227 90 86 70 80 215 14 208 78 213 75 209 73 213 L13 8 8 8 11 11 8 8 11 8 11 11 8 11 8 11 11 11 7 11 11 11 8 11 8 11 11 11 11 8 11 8 11 8 11 B 11 B B PLP PLP PLP PLP PLP PLP PLP PLP PLP PLP PLP PLP PLP PLP PLP PLP PLP PLP PLP PLP PLP PLP PLP PLP PLP PLP PLP PLP PLP LPS PLP LPS PLP PLP PLP PLP PLP PLP TSH TSH TSC TSC TSC TSC TSC TSC TSC TSC TSC TSC TSC TSC TSH TSH TSH TSH TSH TSH TSC TSC TSC TSC TSC TSC TSC TSC TSH TSH TSH TSH TSC TSC TSC TSC TSC TSC+11.17+10.81+1.21+0. 84+0.19+0.22+1.26+0.92+0.94+0.61+5.63+5.71+5. 23+5.27+0.36+0.08+0.72+0.80+0.23+0.09+9.66+9.31+9.19+9.64+0.39+0.09+0.38+0.26+2.08+1.88+2.03+1.96+9.82+5.54+5.29+5.47+5.27+0.56 TEC TER LAR TEC TER LAR TEC TER LAM TSC TSC LAM TSC TSC LAR TEC TER LAM TEC TER LAR TSC TSC LAR TEC TEH LAR TSC TSC LAB TSC 01C LAR TEC TER LAR TSC 01C LAR TEC TER LAR TSN TSH LAR3.7 TSH TSH LAR5.2 TSH TSH LAR4.5 TEC TER LAR TSH TSH LAR3.6 TSH TSH LAR5.4 TSC 01C LAR TEC TER LAR TSC O1C LAR TEC TER LAR TSC TSC LAR7.8 TSC TSC LAM9.2 TSC TSC LAR TSC TSC LAR7.9 TEC TER LAR TSH TSH LAR TEC TER LAR TSH TSH LAR TEC TEH LAR TSC 01C LAR TEC TER LAR TSC 01C LAR TEC TER LAR TEC TER LAR VLP VLP VLP VLP VLP VLP VLP VLP VLP 5.60 5.63 2CAL 4 37 12 26 4 4 32 26 4 26 4 4 66 4 68 72 72 70 66 72 72 4 66 4 68 S 5 4 5 4 70 3 70 13 4 13 4 13 18 I LEG PROBE HOT 610UL HOT 610UL HOT 610UL COLD 610PP COLD 610PP HOT 610UL HOT 61OUL COLD 610PP HOT 61OUL COLD 61OPP COLD 61OPP HOT 610UL COLD 610PP HOT 61OUL HOT 61OPP HOT 61OPP HOT 610PP HOT 610UL HOT 610PP HOT 61OPP COLD 610PP HOT 610UL COLD 610PP HOT 610UL COLD 610PP COLD 610PP COLD 610PP COLD 610PP ROT 610UL HOT 610PP HOT 61OUL HOT 610PP HOT 61OUL COLD 610PP HOT 61OUL COLD 61OPP HOT 61OUL HOT 61OUL Total Tubes : 25 Total Records: 38 Serial No. 06-060 Page 13 Attachment 5 SLG Indications Millstone Unit 2 04/05 -2R16 GROUP SLG Indications (TS SLG Indications (TSC)TUBES 18 9 SLG Indications FANr -. ru P ll ldOI V*be IJ'S/G 1 HOT PRIMARY FACE TOTAL TUBES: 8523 SELECTED TUBES: 27 OUT OF SERVICE (#): 1---SCALE: 0.066571 X Fri May 27 10:59:10 2005 I tItom Unlit 2: SIG 1 HOT e s I NOZZLE IA, ni.I 4AtA 130 130 120 120 110 110 100 0 R0.100 90 -90 80 j 0(0 80 70 70 MANWAY gem- 60 60 0 0 ok 50 50 r 40 40 -C 30 -E 50 0 I 90-30 20 ,_100 20-10 10_ _'4--- V- ~WI-0-oUo-110 120 10 20 30 40 50 60 130 140 150 160 Framatome ANP Inc.Customer Name: Millstone Unit 2 5/27/2005 11:00:43 AM Component:
1 R23 C102 Weld slag previously identified in 03 and 02. Visual           No R24 C103 No wear was detected.
S/G 1 Page 1 of 1 SLG Indications QUERY: SLG Indications ROW COL 27 46 28 47 30 47 31 46 31 48 32 47 33 46 33 48 33 50 34 47 34 49 35 48 35 50 36 47 37 50 38 49 39 50 47 54 55 70 113 60 117 60 118 75 121 60 121 62 123 68 128 61 133 64 VOLTS DEG 0.82 1.03 1.60 1.05 1.45 1.87 1.33 2.23 2.10 1.64 2.06 1.58 2.35 0.80 2.33 2.02 2.25 0.71 2.25 2.31 2.27 2.77 2.08 2.00 32 0.70 38 2.05 2.29 CHN IND 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG 8 SLG%TW LOCATION TSH +0.58 TSH +0.70 TSH +1.05 TSH +1.17 TSH +1.22 TSH +1.08 TSH +0.72 TSH +1.25 TSH +0.94 TSH +0.99 TSH +0.91 TSH +1.24 TSH +1.89 TSH +0.86 TSH +1.54 TSH +0.93 TSH +1.70 TSH +1.10 TSC +0.46 TSC +0.45 TSC +0.45 TSC +0.45 TSC +0.45 TSC +0.48 TSC +1.51 TSC +0.45 TSC +0.45 EXT EXT UTIL 1 UTIL 2 TEC TER TEC TER TEC TER TEC TER TEC TER TEC TER TEC TER TEC TER TEC TER TEC TER TEC TEH TEC TER TEC TEH TEC TER TEC TER TEC TER TEC TEH TEC TEH TEC TER TEC TER TEC TER TEC TER TEC TER TEC TEH TEC TER TEC TER TEC TER CAL # LEG 5 HOT 4 HOT 3 HOT 5 HOT 3 HOT 4 HOT 4 HOT 4 HOT 30 HOT 3 HOT 3 HOT 3 HOT 29 HOT 4 HOT 30 HOT 3 HOT 29 HOT 29 HOT 54 HOT 13 HOT 13 HOT 15 HOT 13 HOT 13 HOT 16 HOT 13 HOT 13 HOT PROBE 610UL 610UL 6100L 610UL 61OUL 610UL 610UL 61OUL 61OUL 610UL 610UL 610UL 6100L 610UL 61OUL 61OUL 610UL 610UL 610UL 61OUL 61OUL 610UL 61OUL 61OUL 61OUL 610UL 61OUL Total Tubes : 27 Total Records: 27 Serial No. 06-060 Page 14 Attachment 6% TW FB Indications Millstone Unit 2 GROUP B TWD Indications
R24 C101 TSC+1.0" 2 R30 C97 Cold staywell. Sludge rock wedged between       Visual           No R31 C96 tubes. No wear was observed.
-TUBES'2 Millstone Unit 2 '04/05 -2R16%TW (Bobbin Wear) Indications S/G 1 HOT PRIMARY FACE TOTAL TUBES: 8523 SELECTED TUBES: 2 OUT OF SERVICE (#): 1 SCALE: 0.066571 X Fri May 27 08:53:07 2005 I win.w unit 2: Wu 1 HOT am NOZZLE 1Afl -e a Q,~ -AQ 130 -130 120 120 110 110 100 -100 02 90 90 80 80 70 60 -4 0 e 70 MANWAY e- 60 0 02 1%B o 40 40 30 -0I -C 80 90 A_30 20 20 100 10_ .10 0-v0 S 4 UUO-V-U-U-w-t-UOJ-l 110 10 20 30 40 s0 60 120 130 140 ISO IN0 Framatome ANP Inc. 5/26/2005 4:43:23 PM Customer Name: Millstone Unit 2 Component:
R32 C97 2 R1 37 C102 Hot periphery. Flexitallic gasket metallic     Visual         Yes R136 C103 piece. No wear was observed.
S/G 1 Page 1 of 1%TW (TWD) Indications QUERY: TWD Indications ROW COL VOLTS DEG CHN IND %TW LOCATION 40 155 0.21 113 P 2 TWD 9 P06 -1.66 140 93 0.29 127 P 2 TWD 9 F08 -0.53 EXT EXT UTIL 1 UTIL 2 CAL #=t===G= =============__
R134 C103 2 R1 38 C80 Hot periphery. Flexitallic gasket metallic     Visual         Yes R1 38 C81 piece. No wear was observed.
TEC TER LAR 69 TEC TEH LAR 33 LEG PROBE====== ======HOT 61OUL HOT Sl0UL Total Tubes : 2 Total Records: 2 Serial No. 06-060 Page 15 Attachment 7 VOL Indications Millstone Unit 2 I a e B TROUP B VOL Indications
R140 C81 R139 C82 R141 C82 R141 C84 R137 C80 R140 C83 2 R1 39 C70 Hot periphery. Demineralizer outlet strainer   Visual         Yes screen fragment. No wear was observed.
-TUBES.. .1 Millstone Unit 2 04/05 -2R16 VOL Indications S/G 1 HOT PRIMARY FACE TOTAL TUBES: 8523 SELECTED TUBES: I OUT OF SERVICE (#): NA.SCALE: 0.066571 X Fr May 27 08:53:52 2005+/- moo. UIRZ:WU 1HOTsW NOZZLE'd totogftoQW,~
2 R127 C50   Hot periphery. Flexitallic gasket metallic     Visual         No R1 26 C49 piece. No wear was observed.
6 130 130 120 _,g 120 110 110 100 100 90 _o 6 90 80 80 70 70 MANWAY 60 --50 40 60' 50 0 0 a,- 40 30 20 10 -U Di6&o -- --OOgV 80 go 30 gei , yfC I 06 60 100._ _10_ I 20 U o ''S W -.j-oo-- o J 1314n II I 10 20 30 40 S0 110 120 130 140 150 160 Framatome ANP Inc. 5/26/2005 4:44:21 PM Customer Name: Millstone Unit 2 Component:
R127 C48 R125 C50 2 R1 39 C72 Hot periphery. Flexitallic gasket metallic     Visual           No R138 C73   piece. No wear was observed.
S/G 1 Page 1 of 1 VOL Indications QUERY: VOL Indications ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL f LEG PROBE 2 7 0.77 77 3 VOL TSH +0.15 TSH TSH 70 HOT 610PP Total Tubes : 1 Total Records: 1 I}}
2 R1 41 C88 Weld wire. Cold Periphery. No wear was         Visual           Yes R141 C86   observed R141 C84 2   R37 C80   Cold staywell. . Flexitallic gasket metallic   Visual           No R39 C80   piece. No wear was observed.
R37 C82 R38 C81 R39 C82
 
Serial No. 06-060 Page 7 SG Location                   Description               Method of     Removed Discovery 2         Cold annulus near RIOO C25. Piece of wire. Visual         Yes No contact with any tubes. No wear observed.
2         No-tube lane near R4 C1. Flat head screw. Visual       Yes No contact with any tubes. No wear observed.
2         No-tube lane near R4 C1. Metal turning. No   Visual       Yes contact with any tubes. No wear observed.
2         Cold annulus near R140 C85. Demineralizer     Visual         Yes outlet strainer screen fragment. No contact with any tubes. No wear observed.
 
Serial No. 06-060 Page 8 Attachments Attachment                                     Title 1     Acronyms 2     Tube Sheet Map and Listing - DNG Indications 3    Tube Sheet Map and Listing - DNT Indications 4    Tube Sheet Map and Listing - PLP Indications 5    Tube Sheet Map and Listing - SLG Indications 6    Tube Sheet Map and Listing - % TW FB Indications 7    Tube Sheet Map and Listing - VOL Indications
 
Serial No. 06-060 Page 9 Attachment I Acronyms B&W Babcock & Wilcox BLG Bulge C   Column DNG Ding DNT Dent ECT Eddy Current Testing EFPY Effective Full Power Years FB   Fan Bar MP 2 Millstone Unit 2 MRPC Motorized Rotating Pancake Coil OXP Over Expansion PLP Possible Loose Part PTE Partial Tubesheet Expansion
% TW Percent Throughwall R   Row SG 1 Steam Generator Number 1 SG 2 Steam Generator Number 2 SLG Sludge SSI Secondary Side Inspection TEC Tube End Cold-leg TEH Tube End Hot-leg TSC Top of Tube Sheet Cold-leg TSH Top of Tube Sheet Hot-leg VOL Volumetric Indication
 
Serial No. 06-060 Page 10 Attachment 2 DNG Indications
 
Millstone Unit 2                                                                 i1 GROUP B DNG Indications TLUBES 12 Millstone Unit 2 04/05 - 2R16 DNG Indications S/G 1                                                                                                     TOTAL TUBES: 8523 HOT                                                                                                      SELECTED TUBES: 12 PRIMARY FACE                                                                                            OUT OF SERVICE (#): I                               SCALE: 0.066571 X Fri May 27 08:42:51 2005 I       l IJIIIIZL 011 fIJI
                                                                                                                                                              -fl NOZZLE 00eg                 oemo,!60
                                                                      .mr&             "
0.0 000000200                          0 2~
130                                                          130
_^,I 28RoA 120                                                                                 120 110    _^                                                                                               : 110 100                                                                                                                         100 90                                                                                                                                         90 80                                                                                                                                               80 70   -,                                                                                                                                                     70    MANWAY 0
0 O-  60 0
00 40) s~0o 300 40 000 50 30 1   000
                                                              .__ 0--10
_ _ _ _ _ _-_- _ _-_-_ _7
                                                                                    - -   - -_                                                                                          20
                                                                                                                                                                                      -   10 JI                                        W                                                   I ,- - - -v-W-   - - -   -     - -   - --   w I         I                                                                           I         I                I                1 110 10        20        30        40      50                                                      10040350140                                               160 160
 
Framatome ANP Inc.                                     5/26/2005 4:30:43 PM Customer Name: Millstone Unit 2                        Component: S/G I                     Pace I of I DNG Indications QUERY: DNG Indications ROW COL VOLTS   DEG CHN IND %TW LOCATION            EXT EXT    UTIL  1 UTIL 2 CAL # LEG PROBE
                            ===    =  =  _=  = =  =  ==== =======
20  61  4.26    184 1  DNG    Fol    +12.29     TEC TER    HR            32   HOT 61OUL 20  63 4.36    184 1   DNG     F07      +5.18      TEC TEE    HR            31    HOT 61OUL 21  104 5.47    185 1   DNG     F01      +7.10      TEC TER    HR            25    HOT 61OUL 25  64  6.59    183 1   DNG     F06      +2.22      TEC TEH    HR            32    HOT 61OUL 29  34  2.71    188 1   DNG     01H      +20.24    TEC TEE    HR            8    HOT 61OUL 57  158 5.05    186 1   DUG    F06      +5.69      TEC TEH    HR            68    HOT 61OUL 59  42  2.81    184 1   DNG     TSC      +14.91    TEC TEE    HR             5     HOT 610UL 69  72  4.02    187 1  DNG    04C      +28.11    TEC TER   HR             32    HOT 61OUL 103 32  3.19    186 1  DNG    06C      +19.94    TEC TER    HR             4    HOT 61oUL 114 99  4.26    186 1  DNG    02H    +33.86      TEC TER    HR             22    HOT 61OUL 132 55  4.89    185 1  DNG    TSC     +0.61      TEC TEE   HR             13    HOT 61OUL 136 63  4.18    184 1  DNG    F02      +3.80      TEC TER   HR             14    HOT 61OUL Total Tubes  : 12 Total Records: 12
 
Serial No. 06-060 Page 11 Attachment 3 DNT Indications
 
Millstone Unit 2                                                                                 GROUP B DNT Indications ATUBES 13 Millstone Unit 2 04/05 - 2R16 DNT Indications FANP- 0MmfnOpmwdueValon 3.2 S/G 1                                                                                                                 TOTAL TUBES: 8523 HOT                                                                                                                  SELECTED TUBES: 13 SCALE: 0.066571 X PRIMARY FACE                                                                                                        OUT OF SERVICE (#): I                     Fri May 27 08:44:22 2005
                                                                                                                                                      -Iunm;       I ~1                             mu anor NOZZLE
                                                                      -4   1219-e2e6egeg0geg~RW,-0110 120 0
130                                                                       130 120,                                                                                             120 n4 110   -0(                                                                                                         110 0 08jj 100                                                                                                                           100
                                                                                                                                                              .b' 0
90                                                                                                                                          go9 80                                                                                                                                                 80 70                                                                                                                                                         70     MANWAY 60                                                                                                                                                                 60 50                                                                                                                                                                       50 40   7                                                                                                                                                                         40
                                                                                        -                        30   -                                                                     -- - - - - - - -----                                                                           -   30 20                                                                 _ 70 - -                               00                         -                                                20 10    -                                                         - - - - - -                                                                                                           -    10 O.
I                                                               110 I                   I Io 20        30         40     50 60                                                                 120        130       140         ISO       ISO
 
Framatome ANP Inc.                                 5/26/2005 4:31:17 PM Customer Name: Millstone Unit 2                   Component: S/G 1                     Page 1 of 1 DNT Indications QUERY: DNT Indications ROW COL VOLTS   DEG CHN IND %TW LOCATION       EXT EXT UTIL 1 UTIL 2 CAL I LEG PROBE 16 167 3.11   177 P 1 DNT     07H     +0.68 TEC TEH HR             66   HOT 61OUL 20 61   4.26   178 P 1 DNT     F07     -0.40 TEC TER HR             32   HOT 61OUL 20 63   3.77   179 P 1 DNT     F06     +1.97 TEC TEH HR     LAR     31   HOT 610UL 37 108 3.98   180 P 1 DNT     F06     +0.56 TEC TER HR             28   HOT 610UL 48 129 2.98   184 P 1 DNT     F05     +0.33 TEC TER HR             63   HOT 610UL 49 106 3.33   181 P 1 DNT     07C     +1.74 TEC TEH HR             28   HOT 61OUL 60 113 3.86   182 P 1 DNT     07C     +1.61 TEC TEH HR             28   HOT 610UL 85 42   2.36   180 P 1 DNT     07C     +1.68 TEC TEH HR             2     HOT 61OUL 87 52   3.69   183 P 1 DNT     07C     +1.67 TEC TER HR             13   HOT 61OUL 92 53   3.16   179 P 1 DNT     07C     +1.49 TEC TER HR             14   HOT 610UL 92 91   4.01   175 P 1 DNT     07H     +1.40 TEC TEH HR             20   HOT 610UL 108 51   3.64   181 P 1 DNT     07C     +1.55 TEC TEH HR             13   HOT 61OUL 113 70   3.24   178 P 1 DNT     07C     +1.20 TEC TEH HR             16   HOT 610UL Total Tubes   : 13 Total Records: 13
/
 
Serial No. 06-060 Page 12 Attachment 4 PLP Indications
 
Millstone Unit 2                                                                    GROUP                            TUBES lIl                                                           Millstone Unit 2                                                                 B PLP Indications                         25 04/05 - 2R16 PLP Indications S/G 1                                                                                                                 TOTAL TUBES: 8523 HOT                                                                                                                  SELECTED TUBES: 25 PRIMARY FACE                                                                                                      OUT OF SERVICE (#): NA                   SCALE: 0.066571 X Fri May 27 08:51:04 2005 o  I HO jUT..
                                                                                                                                                                                            ....I NOZZLE WntI                 A 130                                                           130 120                                                                                   120 110                                                                                                     110 100                                                                                                               100 90                                                                                                                                   90 60
: 1.    -  28 000 ,
                                ~go00o 28
                                        ~
o0    o 8 ~ ~ ~ 8&sect;              0
                                                ~ 8 ~ ~ ~ e~ g g g ~~~ 88 8                 Ie&
J g g0~4 ~ s 8 8 8 8 8 ~ 8 8 8 ~ ~ 8 8 8 0 8 8g8 1 f8 o o1 8o
                                                                                                        ~ 8 8 8 0 ~~ 0 0 0 0 0 0 8o o
0 00 0 8      80 o 8 !
                                                                                                                                                              -&sect;0 1
                                                                                                                                                                      - g    70 MANWAY
                    - ,A                    0 0 0 0 0 0 08 8 8 8 8 8 8 8 08 8 8 8 o o o o8 8 ~ 8 8 8 0 0 08 0 8 0 8 0 08 8 8 8 8 ~ 8 8 808              8 08             0 8 - s8o8 50 0808800       ~o80800 8~o~~o8 oOOO 0080080000~   o                      0 % ~0   &0 ~ ~     ~ 840 40      0 30    - '000                                                                                                                                                              - 30 80    .
90 20 100                                                                 20 10      o-08                                                                                                                                                                        10 110 I                                   I 10           20         30       40         50       60                                               120     130       140         150         160
 
Framatome ANP Inc.                                         5/26/2005 4:34:46 PM Customer Name: Millstone Unit 2                            C     n       S/Gf 1                     Page 1 of 1 PLP Indications (including any LPI LPM LPR LPS Indications)
QUERY: PLP Indications I . ROW COL VOLTS  DEG CHN IND %TW LOCATION                EXT EXT    UTIL  1 UTIL 22CAL 4I LEG  PROBE
__    _                                    =    _
                                                                    = ===== _
14  1   0.29   183  8  PLP    TSH      +11.17        TEC TER    LAR              37    HOT  610UL 16  1   0.29  212  8  PLP    TSH      +10.81        TEC TER    LAR              12    HOT  610UL 23  102 1.05    45  8  PLP    TSC      +1.21          TEC TER    LAM              26    HOT  610UL 0.60  78  11 PLP    TSC      +0. 84        TSC TSC    LAM              4    COLD 610PP 24  101 0.47    78  11 PLP    TSC      +0.19          TSC TSC    LAR              4    COLD 610PP 2.78  189  8  PLP    TSC      +0.22          TEC TER    LAM              32    HOT  610UL 24  103 0.77    35  8  PLP    TSC      +1.26         TEC TER    LAR              26    HOT  61OUL 0.60  77  11 PLP    TSC      +0.92          TSC TSC    LAR              4    COLD 610PP 25  102 1.15    42  8  PLP    TSC      +0.94          TEC TEH    LAR              26    HOT  61OUL 0.63  77  11 PLP    TSC      +0.61          TSC TSC    LAB              4    COLD 61OPP 26  165 0.30    78  11 PLP    TSC      +5.63          TSC 01C    LAR              4    COLD 61OPP 0.35  34  8  PLP    TSC      +5.71          TEC TER    LAR              66    HOT  610UL 28  165 0.26    82  11 PLP    TSC      +5. 23        TSC 01C    LAR              4    COLD 610PP 0.31  218  8  PLP    TSC      +5.27          TEC TER    LAR              68    HOT  61OUL 40  159 0.37    87  11 PLP    TSH      +0.36         TSN TSH    LAR3.7  VLP    72    HOT  61OPP 41  158 0.28    88   11 PLP    TSH      +0.08          TSH TSH    LAR5.2  VLP    72    HOT  61OPP 41  160 0.31    89  11 PLP    TSH      +0.72         TSH TSH    LAR4.5  VLP    70   HOT  610PP 0.26  72  7 PLP    TSH      +0.80          TEC TER    LAR              66    HOT  610UL 42  159 0.16    91  11 PLP    TSH      +0.23          TSH TSH    LAR3.6  VLP    72    HOT  610PP 43  158 0.32  83  11 PLP     TSH      +0.09          TSH TSH    LAR5.4  VLP    72    HOT  61OPP 45  162 0.45    78  11 PLP     TSC      +9.66          TSC 01C    LAR              4    COLD 610PP 0.81  219  8  PLP     TSC      +9.31          TEC TER    LAR              66    HOT  610UL 47  162 0.34    80  11 PLP     TSC      +9.19          TSC O1C    LAR              4    COLD 610PP 0.70  227  8  PLP     TSC      +9.64          TEC TER    LAR              68    HOT  610UL 87  28  0.20  90  11 PLP     TSC      +0.39          TSC TSC    LAR7.8  VLP    S    COLD 610PP 88  27  0.19  86  11 PLP     TSC     +0.09          TSC TSC   LAM9.2  VLP    5    COLD 610PP 89  26 0.14    70  11 PLP    TSC     +0.38          TSC TSC   LAR      VLP    4    COLD 610PP 91: 26 0.21    80  11 PLP    TSC     +0.26          TSC TSC   LAR7.9  VLP    5    COLD 610PP 94  33 0.29    215  8  PLP    TSH     +2.08          TEC TER    LAR              4    ROT  610UL 0.11  14  11 LPS    TSH      +1.88          TSH TSH    LAR      5.60    70    HOT  610PP 96  33 0.24    208  8  PLP    TSH      +2.03          TEC TER    LAR              3    HOT  61OUL 0.22   78  11 LPS    TSH      +1.96          TSH TSH    LAR      5.63    70    HOT  610PP 127 !50  0.43  213  8  PLP    TSC      +9.82          TEC TEH    LAR              13    HOT  61OUL 130 '57 0.28    75  11 PLP    TSC      +5.54          TSC 01C    LAR              4    COLD 610PP 0.36   209  B  PLP    TSC      +5.29          TEC TER    LAR              13    HOT  61OUL K  131 '56 0.11    73  11 PLP    TSC      +5.47          TSC 01C    LAR              4    COLD 61OPP 0.10    213 B  PLP    TSC      +5.27          TEC TER    LAR              13    HOT  61OUL 139  78 0.23     L13 B  PLP    TSC      +0.56          TEC TER    LAR              18    HOT  61OUL Total Tubes  : 25 Total Records: 38
 
Serial No. 06-060 Page 13 Attachment 5 SLG Indications
 
GROUP                                          TUBES SLG Indications (TS Millstone Unit 2                                                                         SLG Indications (TSC) 18 9
04/05 - 2R16 SLG Indications FANr -. ru    P ll ldOI V*be IJ' S/G 1                                                                                                      TOTAL TUBES: 8523 HOT                                                                                                      SELECTED TUBES: 27 PRIMARY FACE                                                                                            OUT OF SERVICE (#): 1                                       SCALE:---0.066571 X Fri May 27 10:59:10 2005 I tItom Unlit2: SIG 1 HOT                                  e sI NOZZLE IA,ni.I              4AtA 130                                                        130 120                                                                                  120 110                                                                                                    110 100                                                                                                                      100 0
R0.
90  -                                                                                                                                      90 j
80 0(                                                                                                                                              80 0
70                                                                                                                                                              70      MANWAY 60                                                                                                                                                                gem-  60 0 ok 0
50                                                                                                                                                                                50 40    -                                                                                                                                                                            r      40 50 I 0
C 30    - E 30 90 20                                                                                                                                                                                        ,_    20 100 10                                                                                                _ _
                                                                                                                                                                                                    -    10
                        '4 ---  V-    ~WI                                                                                                                                              oUo-110 10              20          30    40    50 60                                                    120            130          140              150      160
 
Framatome ANP Inc.                                 5/27/2005 11:00:43 AM Customer Name: Millstone Unit 2                   Component: S/G 1                    Page 1 of 1 SLG Indications QUERY: SLG Indications ROW COL VOLTS  DEG CHN IND %TW LOCATION      EXT EXT  UTIL  1 UTIL  2 CAL # LEG PROBE 27  46  0.82        8  SLG    TSH     +0.58 TEC TER                   5    HOT 610UL 28  47  1.03        8  SLG    TSH     +0.70 TEC TER                   4    HOT 610UL 30  47  1.60        8  SLG    TSH      +1.05 TEC TER                   3    HOT 31  46  1.05        8  SLG    TSH      +1.17 TEC TER                            6100L 5   HOT 610UL 31  48  1.45        8  SLG    TSH    +1.22  TEC TER                  3    HOT 61OUL 32 47  1.87        8  SLG    TSH      +1.08 TEC TER                  4   HOT 610UL 33  46  1.33        8  SLG    TSH      +0.72 TEC TER                  4   HOT 610UL 33  48  2.23        8  SLG    TSH      +1.25 TEC TER                  4   HOT 61OUL 33  50  2.10        8  SLG    TSH      +0.94 TEC TER                  30  HOT 61OUL 34  47  1.64        8  SLG    TSH      +0.99 TEC TER                  3    HOT 610UL 34  49  2.06        8  SLG    TSH    +0.91  TEC TEH                  3    HOT 610UL 35  48  1.58        8  SLG    TSH      +1.24 TEC TER                  3    HOT 610UL 35  50  2.35        8  SLG    TSH    +1.89  TEC TEH                  29  HOT 6100L 36  47  0.80        8  SLG    TSH    +0.86  TEC TER                  4    HOT 610UL 37  50  2.33        8  SLG    TSH    +1.54  TEC TER                  30  HOT 61OUL 38  49  2.02        8  SLG    TSH    +0.93  TEC TER                  3    HOT 61OUL 39  50  2.25        8  SLG    TSH    +1.70  TEC TEH                  29  HOT 610UL 47  54  0.71        8  SLG    TSH    +1.10  TEC TEH                  29  HOT 610UL 55  70  2.25        8  SLG    TSC    +0.46  TEC TER                            610UL 54  HOT 113 60  2.31        8  SLG     TSC    +0.45  TEC TER                  13  HOT 61OUL 117 60  2.27        8  SLG     TSC     +0.45  TEC TER                  13  HOT 61OUL 118 75  2.77        8  SLG    TSC    +0.45  TEC TER                  15  HOT 610UL 121 60  2.08        8  SLG    TSC    +0.45  TEC TER                  13  HOT 61OUL 121 62  2.00    32  8  SLG    TSC    +0.48  TEC TEH                  13  HOT 61OUL 123 68  0.70   38  8  SLG    TSC    +1.51  TEC TER                  16  HOT 61OUL 128 61  2.05        8  SLG    TSC    +0.45  TEC TER                  13  HOT 610UL 133 64  2.29        8  SLG    TSC    +0.45  TEC TER                  13  HOT 61OUL Total Tubes  : 27 Total Records: 27
 
Serial No. 06-060 Page 14 Attachment 6
% TW FB Indications
 
Millstone Unit 2                                                        GROUP B TWD Indications
                                                                                                                                                                          -  TUBES Millstone Unit 2          '                                                                                                  '2 04/05 - 2R16
                                        %TW (Bobbin Wear) Indications S/G 1                                                                                          TOTAL TUBES: 8523 HOT                                                                                            SELECTED TUBES: 2 PRIMARY FACE                                                                                  OUT OF SERVICE (#): 1                        SCALE: 0.066571 X Fri May 27 08:53:07 2005 Iwin.w  unit 2: Wu 1 HOT                                  am NOZZLE 1Afl - e a  Q,      ~-AQ 130 -                                            130 120                                                                    120 110                                                                                    110 100 -                                                                                                  100 02 90                                                                                                                    90 80                                                                                                                            80 70 70      MANWAY 60 - 4e                                                                                                                                      e-      60 0
02 0
1%B o 40                                                                                                                                                            40 30    -                                                              0I        -C                                                                              A_    30 80 90 20                                                                                                                                                                    20 100 10    _ .
10 0-v0            S            4        UUO-V-U-U-w-t-UOJ-l 110 10      20          30    40    s0 60                                          120      130          140            ISO            IN0
 
Framatome ANP Inc.                                   5/26/2005 4:43:23 PM Customer Name: Millstone Unit 2                       Component: S/G 1                            Page 1 of 1
%TW (TWD) Indications QUERY: TWD Indications ROW COL VOLTS  DEG CHN IND %TW LOCATION      EXT EXT      UTIL      1 UTIL 2 CAL # LEG    PROBE
                                              =t===G=    =============__
                                                                                    ====== ======
40 155 0.21    113 P 2 TWD 9  P06      -1.66 TEC TER      LAR                69            61OUL HOT 140 93 0.29    127 P 2 TWD 9  F08      -0.53 TEC TEH      LAR                33    HOT    Sl0UL Total Tubes  : 2 Total Records: 2
 
Serial No. 06-060 Page 15 Attachment 7 VOL Indications
 
Millstone Unit 2                                                        I      a TROUP e B B VOL Indications
                                                                                                                                                                            -          TUBES Millstone Unit 2                                                                                                      ..   .1 04/05 - 2R16 VOL Indications S/G 1                                                                                                             TOTAL TUBES: 8523 HOT                                                                                                              SELECTED TUBES: I                                .
PRIMARY FACE                                                                                                  OUT OF SERVICE (#): NA                  SCALE: 0.066571 X Fr May 27 08:53:52 2005
                                                                                                                                                      +/-  moo.
1HOTsW    UIRZ:WU NOZZLE 6
                                                                                      'd totogftoQW,~
130                                                    130 120 _,g                                                                        120 110                                                                                            110 100                                                                                                            100 6
90 _o 90 80                                                                                                                                    80 70 70          MANWAY 60 -                                                                                                                                                      -
60 50
                                                                                                                                                                                ' 50 40                                                                                                                                                                  0     0 a,-  40 Di6&o --  - -OOgV 30                      U 80      go                                                                                30 20                                                  gei ,                  _  I 100                                                                          20 10    -                                                                06  ._  _
10 I
U  o  '
                          -    o    W  .j-oo--
yfC  J
                                                                      'S 1314n II                      I 110 10        20              30      40        S0  60                                            120      130        140        150        160
 
Framatome ANP Inc.                                 5/26/2005 4:44:21 PM Customer Name: Millstone Unit 2                   Component: S/G 1                     Page 1 of 1 VOL Indications QUERY: VOL Indications ROW COL VOLTS   DEG CHN IND %TW LOCATION       EXT EXT UTIL 1 UTIL 2 CAL f LEG PROBE 2   7   0.77   77 3   VOL     TSH     +0.15 TSH TSH                 70   HOT 610PP Total Tubes   : 1 Total Records: 1 I}}

Latest revision as of 10:08, 14 March 2020

Technical Specifications Annual Operating Reports for 2005
ML060410115
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 01/31/2006
From: Price J
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
06-060
Download: ML060410115 (31)


Text

Dominion Nudear Connecticut, Inc.

Millstone Power Station  :;FDominion Rope Ferry Road Waterford, CT 06385 AN31 U.S. Nuclear Regulatory Commission Serial No.06-060 Attention: Document Control Desk MPS Lic/MAE RO Washington, DC 20555 Docket Nos. 50-336 50-423 License Nos. DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 2 AND 3 TECHNICAL SPECIFICATIONS ANNUAL REPORT Pursuant to the provisions of Millstone Unit 2 and Millstone Unit 3 Technical Specifications (TS), Dominion Nuclear Connecticut, Inc (DNC) is submitting the annual reports described below. These annual reports cover unit activities for the period January 1, 2005, to December 31, 2005.

Millstone Unit 2:

The Millstone Unit 2 activities provided in this report are covered by Section 6.9.1.4, "Annual Reports" as supplemented by Sections 6.9.1.5b and 5c. Details of these activities are as follows:

  • The results of the steam generator tube inservice inspections performed at Millstone Unit 2 in 2005 are included as Enclosure 1 in accordance with Millstone Unit 2 TS 6.9.1.5b.

Millstone Unit 3:

The Millstone Unit 3 activities provided in this report are covered by Section 6.9.1.2, "Annual Reports." Details of these activities are as follows:

Serial No.06-060 Technical Specifications Annual report Page 2 of 3 There are no regulatory commitments contained within this letter.

If you have any questions or require additional information, please contact Mr. David W.

Dodson at (860) 447-1791, extension 2346.

Very truly yours, icenPrice t/ice President - Millstone

Serial No.06-060 Technical Specifications Annual report Page 3 of 3

Enclosures:

(0)

Commitments made in this letter: None.

cc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8C2 Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station Mr. R. Prince NRC Inspector U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415

Enclosure 1 Millstone Unit 2 2005 Steam Generator Tube Inservice Inspection Millstone Power Station Unit 2 Dominion Nuclear Connecticut, Inc. (DNC)

Serial No.06-060 Page 1 Steam Generator Tube Inspection Millstone Unit 2 (MP2) is a two loop ABB-CE PWR with Babcock and Wilcox (B&W) replacement Steam Generators (SG). Each SG was designed to contain 8523 U-bend thermally treated Inconel 690 tubes. One hot leg tube sheet hole in SG 1 was plugged during construction and the opposing cold leg hole was not drilled, thus SG 1 has 8522 tubes. The tubing is nominally 0.750 inch outside diameter with a 0.0445 inch nominal wall thickness. During replacement SG fabrication, the tubes were installed using a two-step hydraulic expansion process over the full depth of the 21.06 inch thick tubesheet. The tubesheet was drilled on a triangular pitch with 1.0 inch spacing. There are 141 rows and 167 columns in each SG. To minimize small radius U-bends, tubes in rows 1 through 3 were installed using a staggered arrangement. This resulted in the termination of tubes at different locations between the hot and cold legs. For these rows, the tube identification follows the hot leg row/column naming convention.

Secondary side tube support structures include seven lattice grid supports on the vertical section of the tubes and twelve fan bar assemblies on the U-bend section of the tubes. All lattice grid supports are full supports.

SG replacement was completed during 2R1 1 (Fall 1992). The new SGs have accrued 7.037 Effective Full Power Years (EFPY) of operation as of the end of Cycle 16 (April 2005). The 910 MW Unit operates with a hot leg temperature of 601 degrees Fahrenheit.

The Millstone Unit 2 SG eddy current testing (ECT), conducted at the end of Cycle 16, was completed on April 25, 2005. The examinations, personnel, and equipment conformed to the requirements of NEI 97-06, rev. 1, Steam Generator Program Guidelines; EPRI Pressurized Water Reactor Steam Generator Examination Guidelines:

Revision 6; and Millstone Unit 2 Technical Specifications. Performed in SG 1 only, the inspection included a 100% bobbin coil exam and 298 special interest and diagnostic exams utilizing Motorized Rotating Pancake Coil (MRPC) technology. The only indications of degradation recorded were attributed to mechanically induced wear. ECT identified two tubes with nine (9) percent throughwall fan bar wear, unchanged from the 2R14 results. No tubes were removed from service or otherwise repaired.

One hundred percent (100%) of all in-service tubes (8522 tubes) in SG 1 were examined full length with the standard bobbin coil technique. The tubes were examined tube end to tube end (TEC-TEH) from the hot leg channel head.

Two hundred ninety-eight (298) tubes were examined with the MRPC plus-point probe; one hundred forty-two (142) hot-leg roll transition exams and one hundred fifty-six (156) special interest and diagnostic examinations. MRPC examination locations are summarized below and in Table 2.

The extent for the roll transition area examination was top of tube sheet hot (TSH) +3/-3 inches. This area was selected based on the historical hot leg sludge pile region as compiled from previous SG 1 and SG 2 (2R13, 2R14, and 2R15) results. The 142 tube

Serial No.06-060 Page 2 locations selected for examination make up fifty percent (50%) of this total sludge region (284 tubes) identified from both SGs. Approximately seventy-four (74%) of the tubes in the sample had previously identified Sludge (SLG) indications in SG 1. SLG indications reported during the current inspection are mapped in Attachment 5. One tube with a historical Partial Tubesheet Expansion (PTE) indication was also examined TSH-TEH.

One hundred and fifty-six (156) tubes were examined at a specific area of interest. The sixty-three (63) preplanned examinations were conducted at locations of previously identified dents, dings, bulges, possible loose parts, over expansions, and fan bar wear.

Ninety-three (93) diagnostic examinations were conducted at locations associated with indications reported during the current inspection. These included dents, dings, bobbin I-codes, possible loose parts, and tubes surrounding possible or known loose parts.

This ECT examination was conducted following five cycles (7.037 EFPY) of operation with the replacement SGs. There were no indications of any corrosion related tube cracking.

ECT reported two (2) tubes with nine (9) percent throughwall (%TW) fan bar wear. The ECT results from 2R14 also reported 9%TW wear on these tubes, thus the wear has not progressed over the past two operating cycles. Additional details on fan bar wear in both SGs are provided in Table 3 and Attachment 6.

One Volumetric Indication (VOL) was reported. This VOL indication has been reported since the June 1997 examination with MRPC. It is believed to be associated with a Manufacturing Buff Mark (MBM) and exhibits no change since first reported. Additional details are provided in Attachment 7.

Twenty-five (25) PLP indications were also reported. These ECT reported indications were grouped in eleven (11) locations as shown in Attachment 4. Seventeen (17) of the indications were initially reported with the bobbin coil examination and eight (8) with the MRPC examination. Loose parts were observed in an additional three (3) locations during SSI. There were no indications of wear associated with any of the PLP indications or any of the loose parts that were reported. Additional information is included in Table 4.

Although no primary side ECT was performed, SSI reported thirteen (13) loose parts in SG 2. Nine (9) were removed. Three (3) pieces of Flexitallic gasket and one (1) sludge rock remain wedged between tubes. No wear associated with any of the loose parts in SG 2 was reported during the performance of the visual examination.

In summary, 100% of the tubes in SG 1 (8522 tubes) were inspected, TEC-TEH. There were no tubes that required repair as a result of this examination. No tubes were plugged or otherwise repaired on a discretionary basis. As a result of the inspection, SG 1 was classified as C-1. A listing and map of tubes reported with wall-thickness loss is included in Attachment 6. The maximum wall-thickness loss was 9% TW.

Serial No.06-060 Page 3 Table 1 - Eddy Current Results I SG I Number of Tubes 8522 Number of Tubes Inspected full length w/Bobbin Probe 8522 Number of Tube Inspections w/MRPC (Total) 298

  • Hot Leg Transitions - Original Scope 142
  • Hot Leg Misc. Special Interest - Diagnostic Exams 60
  • Cold Leg Misc. Special Interest - Diagnostic Exams 82
  • U-bend Misc. Special Interest - Diagnostic Exams (tubes) 14 Tubes with Max Fan Bar Wear >= 40% 0 Tubes with Max Fan Bar Wear >= 20% but < 40% 0 Tubes with Max Fan Bar Wear <20% 2 Tubes Plugged 0 Tubes Sleeved 0

Serial No.06-060 Page 4 Table 2 - MRPC Examinations Hot Leg Cold Leg U-bend Previous PTE 1 0 0 Indications _

PLP 2 4 0 DNT/DNG 3 9 8 BLG 2 0 0 OXP 19 14 0 Fan Bar Wear 0 0 1 2R16 Bobbin I-Codes 3 0 2 Indications Bobbin PLPs 3 8 0 PLP Bounding & 27 46 0 Resulting PLPs _

DNT/DNG 0 1 3 Total 60 82 14 Table 3 - Fan Bar Wear Ro Col SG  % TW Support Inch from Support Identifie w Identifier Center d 40 155 1 9 F06 -1.74 2R14 9 F06 -1.66 2R16 140 93 1 9 F08 -0.55 2R14 1 9 F08 -0.53 2R16 37 120 2 6 F07 -0.81 2R15 99 80 2 11 F06 1.26 2R15

Serial No.06-060 Page 5 Table 4- Loose Parts Summary SG Location Description Method of Removed Discovery I R89 C26 Small metal turning wedged between tubes. ECT No R91 C26 PLP indications evident in this area in 02, 97, R88 C27 and 94. No wear was reported.

R87 C28 TSC+0.4" 1 R26 C165 Sludge rock located between tubes. PLP ECT No R28 C165 indications evident in 02, 97, and 94. No TSC+5.5" wear was reported.

1 R41 C160 Short piece of wire or Flexitallic gasket. PLP ECT No R42 C159 indications evident in 02. No wear was R40 C159 reported.

R43 C158 R41 C158 TSH+0.8" I R45 C162 Sludge rock located between tubes. PLP ECT No R47 C162 evident in 02, 97, and 94. No wear was TSC+9.6" reported.

I R127 C50 Sludge formation between tubes. No wear ECT Yes R128 C51 was reported. No PLP reported via ECT for TSC+9.8" R128 C51.

1 R140 C77 Weld slag lying on tube sheet between Visual Yes RI 39 C78 tubes. No wear was reported. No PLP R140 C79 reported via ECT for R140 C77 or R140 C79.

TSC 1 R28 C99 Demineralizer outlet strainer screen fragment Visual No R29 C98 lodged between tubes and on the tube sheet.

TSC No wear was reported. No PLP was reported via ECT.

1 R127 C120 3" long metal clip lying in the periphery on Visual Yes R126 C123 the tubesheet adjacent to the listed tubes.

R125 C122 No wear was reported. No PLP was TSH reported via ECT.

I RI 39 C70 Approximately 20 wire brush bristles lying on Visual Yes TSH the tube sheet and adjacent to the tube. No wear was reported. No PLP was reported via ECT.

1 RI 30 C57 Sludge formation wedged between tubes. ECT No RI 31 C56 No wear was reported.

R132 C57 TSC+5.3"

Serial No.06-060 Page 6 SG Location Description Method of Removed Discovery 1 R16 C1 Sludge formation lodged between tubes. No ECT Yes R14 Cl wear was reported.

TSH+10.8" 1 R96 C33 PLP previously reported in 02. No wear was ECT No TSH+2.0" reported. Loose part was not observed visually.

1 R94 C33 PLP previously reported in 02. No wear was ECT No TSH+2.0" reported. Loose part was not observed visually.

1 R23 C102 Weld slag previously identified in 03 and 02. Visual No R24 C103 No wear was detected.

R24 C101 TSC+1.0" 2 R30 C97 Cold staywell. Sludge rock wedged between Visual No R31 C96 tubes. No wear was observed.

R32 C97 2 R1 37 C102 Hot periphery. Flexitallic gasket metallic Visual Yes R136 C103 piece. No wear was observed.

R134 C103 2 R1 38 C80 Hot periphery. Flexitallic gasket metallic Visual Yes R1 38 C81 piece. No wear was observed.

R140 C81 R139 C82 R141 C82 R141 C84 R137 C80 R140 C83 2 R1 39 C70 Hot periphery. Demineralizer outlet strainer Visual Yes screen fragment. No wear was observed.

2 R127 C50 Hot periphery. Flexitallic gasket metallic Visual No R1 26 C49 piece. No wear was observed.

R127 C48 R125 C50 2 R1 39 C72 Hot periphery. Flexitallic gasket metallic Visual No R138 C73 piece. No wear was observed.

2 R1 41 C88 Weld wire. Cold Periphery. No wear was Visual Yes R141 C86 observed R141 C84 2 R37 C80 Cold staywell. . Flexitallic gasket metallic Visual No R39 C80 piece. No wear was observed.

R37 C82 R38 C81 R39 C82

Serial No.06-060 Page 7 SG Location Description Method of Removed Discovery 2 Cold annulus near RIOO C25. Piece of wire. Visual Yes No contact with any tubes. No wear observed.

2 No-tube lane near R4 C1. Flat head screw. Visual Yes No contact with any tubes. No wear observed.

2 No-tube lane near R4 C1. Metal turning. No Visual Yes contact with any tubes. No wear observed.

2 Cold annulus near R140 C85. Demineralizer Visual Yes outlet strainer screen fragment. No contact with any tubes. No wear observed.

Serial No.06-060 Page 8 Attachments Attachment Title 1 Acronyms 2 Tube Sheet Map and Listing - DNG Indications 3 Tube Sheet Map and Listing - DNT Indications 4 Tube Sheet Map and Listing - PLP Indications 5 Tube Sheet Map and Listing - SLG Indications 6 Tube Sheet Map and Listing - % TW FB Indications 7 Tube Sheet Map and Listing - VOL Indications

Serial No.06-060 Page 9 Attachment I Acronyms B&W Babcock & Wilcox BLG Bulge C Column DNG Ding DNT Dent ECT Eddy Current Testing EFPY Effective Full Power Years FB Fan Bar MP 2 Millstone Unit 2 MRPC Motorized Rotating Pancake Coil OXP Over Expansion PLP Possible Loose Part PTE Partial Tubesheet Expansion

% TW Percent Throughwall R Row SG 1 Steam Generator Number 1 SG 2 Steam Generator Number 2 SLG Sludge SSI Secondary Side Inspection TEC Tube End Cold-leg TEH Tube End Hot-leg TSC Top of Tube Sheet Cold-leg TSH Top of Tube Sheet Hot-leg VOL Volumetric Indication

Serial No.06-060 Page 10 Attachment 2 DNG Indications

Millstone Unit 2 i1 GROUP B DNG Indications TLUBES 12 Millstone Unit 2 04/05 - 2R16 DNG Indications S/G 1 TOTAL TUBES: 8523 HOT SELECTED TUBES: 12 PRIMARY FACE OUT OF SERVICE (#): I SCALE: 0.066571 X Fri May 27 08:42:51 2005 I l IJIIIIZL 011 fIJI

-fl NOZZLE 00eg oemo,!60

.mr& "

0.0 000000200 0 2~

130 130

_^,I 28RoA 120 120 110 _^  : 110 100 100 90 90 80 80 70 -, 70 MANWAY 0

0 O- 60 0

00 40) s~0o 300 40 000 50 30 1 000

.__ 0--10

_ _ _ _ _ _-_- _ _-_-_ _7

- - - -_ 20

- 10 JI W I ,- - - -v-W- - - - - - - - -- w I I I I I 1 110 10 20 30 40 50 10040350140 160 160

Framatome ANP Inc. 5/26/2005 4:30:43 PM Customer Name: Millstone Unit 2 Component: S/G I Pace I of I DNG Indications QUERY: DNG Indications ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE

= = _= = = = ==== ====

20 61 4.26 184 1 DNG Fol +12.29 TEC TER HR 32 HOT 61OUL 20 63 4.36 184 1 DNG F07 +5.18 TEC TEE HR 31 HOT 61OUL 21 104 5.47 185 1 DNG F01 +7.10 TEC TER HR 25 HOT 61OUL 25 64 6.59 183 1 DNG F06 +2.22 TEC TEH HR 32 HOT 61OUL 29 34 2.71 188 1 DNG 01H +20.24 TEC TEE HR 8 HOT 61OUL 57 158 5.05 186 1 DUG F06 +5.69 TEC TEH HR 68 HOT 61OUL 59 42 2.81 184 1 DNG TSC +14.91 TEC TEE HR 5 HOT 610UL 69 72 4.02 187 1 DNG 04C +28.11 TEC TER HR 32 HOT 61OUL 103 32 3.19 186 1 DNG 06C +19.94 TEC TER HR 4 HOT 61oUL 114 99 4.26 186 1 DNG 02H +33.86 TEC TER HR 22 HOT 61OUL 132 55 4.89 185 1 DNG TSC +0.61 TEC TEE HR 13 HOT 61OUL 136 63 4.18 184 1 DNG F02 +3.80 TEC TER HR 14 HOT 61OUL Total Tubes  : 12 Total Records: 12

Serial No.06-060 Page 11 Attachment 3 DNT Indications

Millstone Unit 2 GROUP B DNT Indications ATUBES 13 Millstone Unit 2 04/05 - 2R16 DNT Indications FANP- 0MmfnOpmwdueValon 3.2 S/G 1 TOTAL TUBES: 8523 HOT SELECTED TUBES: 13 SCALE: 0.066571 X PRIMARY FACE OUT OF SERVICE (#): I Fri May 27 08:44:22 2005

-Iunm; I ~1 mu anor NOZZLE

-4 1219-e2e6egeg0geg~RW,-0110 120 0

130 130 120, 120 n4 110 -0( 110 0 08jj 100 100

.b' 0

90 go9 80 80 70 70 MANWAY 60 60 50 50 40 7 40

- 30 - -- - - - - - - ----- - 30 20 _ 70 - - 00 - 20 10 - - - - - - - - 10 O.

I 110 I I Io 20 30 40 50 60 120 130 140 ISO ISO

Framatome ANP Inc. 5/26/2005 4:31:17 PM Customer Name: Millstone Unit 2 Component: S/G 1 Page 1 of 1 DNT Indications QUERY: DNT Indications ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL I LEG PROBE 16 167 3.11 177 P 1 DNT 07H +0.68 TEC TEH HR 66 HOT 61OUL 20 61 4.26 178 P 1 DNT F07 -0.40 TEC TER HR 32 HOT 61OUL 20 63 3.77 179 P 1 DNT F06 +1.97 TEC TEH HR LAR 31 HOT 610UL 37 108 3.98 180 P 1 DNT F06 +0.56 TEC TER HR 28 HOT 610UL 48 129 2.98 184 P 1 DNT F05 +0.33 TEC TER HR 63 HOT 610UL 49 106 3.33 181 P 1 DNT 07C +1.74 TEC TEH HR 28 HOT 61OUL 60 113 3.86 182 P 1 DNT 07C +1.61 TEC TEH HR 28 HOT 610UL 85 42 2.36 180 P 1 DNT 07C +1.68 TEC TEH HR 2 HOT 61OUL 87 52 3.69 183 P 1 DNT 07C +1.67 TEC TER HR 13 HOT 61OUL 92 53 3.16 179 P 1 DNT 07C +1.49 TEC TER HR 14 HOT 610UL 92 91 4.01 175 P 1 DNT 07H +1.40 TEC TEH HR 20 HOT 610UL 108 51 3.64 181 P 1 DNT 07C +1.55 TEC TEH HR 13 HOT 61OUL 113 70 3.24 178 P 1 DNT 07C +1.20 TEC TEH HR 16 HOT 610UL Total Tubes  : 13 Total Records: 13

/

Serial No.06-060 Page 12 Attachment 4 PLP Indications

Millstone Unit 2 GROUP TUBES lIl Millstone Unit 2 B PLP Indications 25 04/05 - 2R16 PLP Indications S/G 1 TOTAL TUBES: 8523 HOT SELECTED TUBES: 25 PRIMARY FACE OUT OF SERVICE (#): NA SCALE: 0.066571 X Fri May 27 08:51:04 2005 o I HO jUT..

....I NOZZLE WntI A 130 130 120 120 110 110 100 100 90 90 60

1. - 28 000 ,

~go00o 28

~

o0 o 8 ~ ~ ~ 8§ 0

~ 8 ~ ~ ~ e~ g g g ~~~ 88 8 Ie&

J g g0~4 ~ s 8 8 8 8 8 ~ 8 8 8 ~ ~ 8 8 8 0 8 8g8 1 f8 o o1 8o

~ 8 8 8 0 ~~ 0 0 0 0 0 0 8o o

0 00 0 8 80 o 8 !

-§0 1

- g 70 MANWAY

- ,A 0 0 0 0 0 0 08 8 8 8 8 8 8 8 08 8 8 8 o o o o8 8 ~ 8 8 8 0 0 08 0 8 0 8 0 08 8 8 8 8 ~ 8 8 808 8 08 0 8 - s8o8 50 0808800 ~o80800 8~o~~o8 oOOO 0080080000~ o 0 % ~0 &0 ~ ~ ~ 840 40 0 30 - '000 - 30 80 .

90 20 100 20 10 o-08 10 110 I I 10 20 30 40 50 60 120 130 140 150 160

Framatome ANP Inc. 5/26/2005 4:34:46 PM Customer Name: Millstone Unit 2 C n S/Gf 1 Page 1 of 1 PLP Indications (including any LPI LPM LPR LPS Indications)

QUERY: PLP Indications I . ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 22CAL 4I LEG PROBE

__ _ = _

= ===== _

14 1 0.29 183 8 PLP TSH +11.17 TEC TER LAR 37 HOT 610UL 16 1 0.29 212 8 PLP TSH +10.81 TEC TER LAR 12 HOT 610UL 23 102 1.05 45 8 PLP TSC +1.21 TEC TER LAM 26 HOT 610UL 0.60 78 11 PLP TSC +0. 84 TSC TSC LAM 4 COLD 610PP 24 101 0.47 78 11 PLP TSC +0.19 TSC TSC LAR 4 COLD 610PP 2.78 189 8 PLP TSC +0.22 TEC TER LAM 32 HOT 610UL 24 103 0.77 35 8 PLP TSC +1.26 TEC TER LAR 26 HOT 61OUL 0.60 77 11 PLP TSC +0.92 TSC TSC LAR 4 COLD 610PP 25 102 1.15 42 8 PLP TSC +0.94 TEC TEH LAR 26 HOT 61OUL 0.63 77 11 PLP TSC +0.61 TSC TSC LAB 4 COLD 61OPP 26 165 0.30 78 11 PLP TSC +5.63 TSC 01C LAR 4 COLD 61OPP 0.35 34 8 PLP TSC +5.71 TEC TER LAR 66 HOT 610UL 28 165 0.26 82 11 PLP TSC +5. 23 TSC 01C LAR 4 COLD 610PP 0.31 218 8 PLP TSC +5.27 TEC TER LAR 68 HOT 61OUL 40 159 0.37 87 11 PLP TSH +0.36 TSN TSH LAR3.7 VLP 72 HOT 61OPP 41 158 0.28 88 11 PLP TSH +0.08 TSH TSH LAR5.2 VLP 72 HOT 61OPP 41 160 0.31 89 11 PLP TSH +0.72 TSH TSH LAR4.5 VLP 70 HOT 610PP 0.26 72 7 PLP TSH +0.80 TEC TER LAR 66 HOT 610UL 42 159 0.16 91 11 PLP TSH +0.23 TSH TSH LAR3.6 VLP 72 HOT 610PP 43 158 0.32 83 11 PLP TSH +0.09 TSH TSH LAR5.4 VLP 72 HOT 61OPP 45 162 0.45 78 11 PLP TSC +9.66 TSC 01C LAR 4 COLD 610PP 0.81 219 8 PLP TSC +9.31 TEC TER LAR 66 HOT 610UL 47 162 0.34 80 11 PLP TSC +9.19 TSC O1C LAR 4 COLD 610PP 0.70 227 8 PLP TSC +9.64 TEC TER LAR 68 HOT 610UL 87 28 0.20 90 11 PLP TSC +0.39 TSC TSC LAR7.8 VLP S COLD 610PP 88 27 0.19 86 11 PLP TSC +0.09 TSC TSC LAM9.2 VLP 5 COLD 610PP 89 26 0.14 70 11 PLP TSC +0.38 TSC TSC LAR VLP 4 COLD 610PP 91: 26 0.21 80 11 PLP TSC +0.26 TSC TSC LAR7.9 VLP 5 COLD 610PP 94 33 0.29 215 8 PLP TSH +2.08 TEC TER LAR 4 ROT 610UL 0.11 14 11 LPS TSH +1.88 TSH TSH LAR 5.60 70 HOT 610PP 96 33 0.24 208 8 PLP TSH +2.03 TEC TER LAR 3 HOT 61OUL 0.22 78 11 LPS TSH +1.96 TSH TSH LAR 5.63 70 HOT 610PP 127 !50 0.43 213 8 PLP TSC +9.82 TEC TEH LAR 13 HOT 61OUL 130 '57 0.28 75 11 PLP TSC +5.54 TSC 01C LAR 4 COLD 610PP 0.36 209 B PLP TSC +5.29 TEC TER LAR 13 HOT 61OUL K 131 '56 0.11 73 11 PLP TSC +5.47 TSC 01C LAR 4 COLD 61OPP 0.10 213 B PLP TSC +5.27 TEC TER LAR 13 HOT 61OUL 139 78 0.23 L13 B PLP TSC +0.56 TEC TER LAR 18 HOT 61OUL Total Tubes  : 25 Total Records: 38

Serial No.06-060 Page 13 Attachment 5 SLG Indications

GROUP TUBES SLG Indications (TS Millstone Unit 2 SLG Indications (TSC) 18 9

04/05 - 2R16 SLG Indications FANr -. ru P ll ldOI V*be IJ' S/G 1 TOTAL TUBES: 8523 HOT SELECTED TUBES: 27 PRIMARY FACE OUT OF SERVICE (#): 1 SCALE:---0.066571 X Fri May 27 10:59:10 2005 I tItom Unlit2: SIG 1 HOT e sI NOZZLE IA,ni.I 4AtA 130 130 120 120 110 110 100 100 0

R0.

90 - 90 j

80 0( 80 0

70 70 MANWAY 60 gem- 60 0 ok 0

50 50 40 - r 40 50 I 0

C 30 - E 30 90 20 ,_ 20 100 10 _ _

- 10

'4 --- V- ~WI oUo-110 10 20 30 40 50 60 120 130 140 150 160

Framatome ANP Inc. 5/27/2005 11:00:43 AM Customer Name: Millstone Unit 2 Component: S/G 1 Page 1 of 1 SLG Indications QUERY: SLG Indications ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE 27 46 0.82 8 SLG TSH +0.58 TEC TER 5 HOT 610UL 28 47 1.03 8 SLG TSH +0.70 TEC TER 4 HOT 610UL 30 47 1.60 8 SLG TSH +1.05 TEC TER 3 HOT 31 46 1.05 8 SLG TSH +1.17 TEC TER 6100L 5 HOT 610UL 31 48 1.45 8 SLG TSH +1.22 TEC TER 3 HOT 61OUL 32 47 1.87 8 SLG TSH +1.08 TEC TER 4 HOT 610UL 33 46 1.33 8 SLG TSH +0.72 TEC TER 4 HOT 610UL 33 48 2.23 8 SLG TSH +1.25 TEC TER 4 HOT 61OUL 33 50 2.10 8 SLG TSH +0.94 TEC TER 30 HOT 61OUL 34 47 1.64 8 SLG TSH +0.99 TEC TER 3 HOT 610UL 34 49 2.06 8 SLG TSH +0.91 TEC TEH 3 HOT 610UL 35 48 1.58 8 SLG TSH +1.24 TEC TER 3 HOT 610UL 35 50 2.35 8 SLG TSH +1.89 TEC TEH 29 HOT 6100L 36 47 0.80 8 SLG TSH +0.86 TEC TER 4 HOT 610UL 37 50 2.33 8 SLG TSH +1.54 TEC TER 30 HOT 61OUL 38 49 2.02 8 SLG TSH +0.93 TEC TER 3 HOT 61OUL 39 50 2.25 8 SLG TSH +1.70 TEC TEH 29 HOT 610UL 47 54 0.71 8 SLG TSH +1.10 TEC TEH 29 HOT 610UL 55 70 2.25 8 SLG TSC +0.46 TEC TER 610UL 54 HOT 113 60 2.31 8 SLG TSC +0.45 TEC TER 13 HOT 61OUL 117 60 2.27 8 SLG TSC +0.45 TEC TER 13 HOT 61OUL 118 75 2.77 8 SLG TSC +0.45 TEC TER 15 HOT 610UL 121 60 2.08 8 SLG TSC +0.45 TEC TER 13 HOT 61OUL 121 62 2.00 32 8 SLG TSC +0.48 TEC TEH 13 HOT 61OUL 123 68 0.70 38 8 SLG TSC +1.51 TEC TER 16 HOT 61OUL 128 61 2.05 8 SLG TSC +0.45 TEC TER 13 HOT 610UL 133 64 2.29 8 SLG TSC +0.45 TEC TER 13 HOT 61OUL Total Tubes  : 27 Total Records: 27

Serial No.06-060 Page 14 Attachment 6

% TW FB Indications

Millstone Unit 2 GROUP B TWD Indications

- TUBES Millstone Unit 2 ' '2 04/05 - 2R16

%TW (Bobbin Wear) Indications S/G 1 TOTAL TUBES: 8523 HOT SELECTED TUBES: 2 PRIMARY FACE OUT OF SERVICE (#): 1 SCALE: 0.066571 X Fri May 27 08:53:07 2005 Iwin.w unit 2: Wu 1 HOT am NOZZLE 1Afl - e a Q, ~-AQ 130 - 130 120 120 110 110 100 - 100 02 90 90 80 80 70 70 MANWAY 60 - 4e e- 60 0

02 0

1%B o 40 40 30 - 0I -C A_ 30 80 90 20 20 100 10 _ .

10 0-v0 S 4 UUO-V-U-U-w-t-UOJ-l 110 10 20 30 40 s0 60 120 130 140 ISO IN0

Framatome ANP Inc. 5/26/2005 4:43:23 PM Customer Name: Millstone Unit 2 Component: S/G 1 Page 1 of 1

%TW (TWD) Indications QUERY: TWD Indications ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE

=t===G= =============__

40 155 0.21 113 P 2 TWD 9 P06 -1.66 TEC TER LAR 69 61OUL HOT 140 93 0.29 127 P 2 TWD 9 F08 -0.53 TEC TEH LAR 33 HOT Sl0UL Total Tubes  : 2 Total Records: 2

Serial No.06-060 Page 15 Attachment 7 VOL Indications

Millstone Unit 2 I a TROUP e B B VOL Indications

- TUBES Millstone Unit 2 .. .1 04/05 - 2R16 VOL Indications S/G 1 TOTAL TUBES: 8523 HOT SELECTED TUBES: I .

PRIMARY FACE OUT OF SERVICE (#): NA SCALE: 0.066571 X Fr May 27 08:53:52 2005

+/- moo.

1HOTsW UIRZ:WU NOZZLE 6

'd totogftoQW,~

130 130 120 _,g 120 110 110 100 100 6

90 _o 90 80 80 70 70 MANWAY 60 - -

60 50

' 50 40 0 0 a,- 40 Di6&o -- - -OOgV 30 U 80 go 30 20 gei , _ I 100 20 10 - 06 ._ _

10 I

U o '

- o W .j-oo--

yfC J

'S 1314n II I 110 10 20 30 40 S0 60 120 130 140 150 160

Framatome ANP Inc. 5/26/2005 4:44:21 PM Customer Name: Millstone Unit 2 Component: S/G 1 Page 1 of 1 VOL Indications QUERY: VOL Indications ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL f LEG PROBE 2 7 0.77 77 3 VOL TSH +0.15 TSH TSH 70 HOT 610PP Total Tubes  : 1 Total Records: 1 I