ML093200652: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-301 Administrative T opics Outline Form ES-301-1 NUREG-1021, Revision 9.1 1 of 2 SONGS Oct 2009 RO ES-301-1 Rev 1 Facility: SONGS 2 & 3 Date of Examination: 10/19/09 Examination Level RO   Operating Test Number: NRC Administrative Topic (see Note) Type Code* Describe Activity to be Performed Conduct of Operations N, R 2.1.23 Ability to perform specific system and integrated plant procedures during all modes of plant operation (4.3).
{{#Wiki_filter:ES-301                               Administrative Topics Outline                       Form ES-301-1 Facility:     SONGS 2 & 3                               Date of Examination:           10/19/09 Examination Level                     RO                 Operating Test Number:         NRC Administrative Topic         Type Code*                 Describe Activity to be Performed (see Note) 2.1.23 Ability to perform specific system and integrated plant procedures during all modes Conduct of Operations              N, R                of plant operation (4.3).
JPM:   Perform an RCS Inventory Balance (New).
JPM:     Perform an RCS Inventory Balance (New).
Conduct of Operations M, R 2.1.25    Ability to interpret reference materials such as graphs, curves, tables, etc. (3.9).
2.1.25    Ability to interpret reference materials such as graphs, curves, tables, etc. (3.9).
JPM:   Determine Time to Boil (J213A).
Conduct of Operations              M, R JPM:     Determine Time to Boil (J213A).
Equipment Control N, R 2.2.12 Knowledge of Surveillance Procedures (3.7).
2.2.12 Knowledge of Surveillance Procedures (3.7).
JPM: Perform Core Exit Thermocouple Channel Checks. (New)
Equipment Control                  N, R JPM:     Perform Core Exit Thermocouple Channel Checks. (New) 2.3.12 Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high-Radiation Control                  M, S                radiation areas, aligning filters, etc. (3.2).
Radiation Control M, S 2.3.12 Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc. (3.2).
JPM:     Determine Dose for Maintenance Activities (J236A2).
JPM: Determine Dose for Maintenance Activities (J236A2).
Emergency Plan                         -
Emergency Plan - NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required. *Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs;  for 4 for SROs & RO retakes)
NOTE:         All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
(N)ew or (M)odified from bank ( 1) (P)revious 2 exams ( 1; randomly selected)  
*Type Codes & Criteria:           (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs;  for 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
NUREG-1021, Revision 9.1                        1 of 2          SONGS Oct 2009 RO ES-301-1 Rev 1


Administrative Topics Outline Task Summary NUREG-1021, Revision 9.1 2 of 2 SONGS Oct 2009 RO ES-301-1 Rev 1 RO A.1.a The candidate will perform a Reactor Coolant System Inventory Balance per SO23-3-3.37, Reactor Coolan t System Inventory Balance
Administrative Topics Outline Task Summary RO A.1.a   The candidate will perform a Reactor Coolant System Inventory Balance per SO23-3-3.37, Reactor Coolant System Inventory Balance. The critical steps include correctly documenting parameters and performing calculations within allowable tolerances. This is a new JPM.
. The critical steps include correctly docum enting parameters and performing calculations within allowable tolerances. This is a new JPM.
RO A.1.b  The candidate will calculate Time-to-Boil per SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin.
The critical steps include correctly interpreting curves within tolerances and performing the final calculation within given tolerances. This is a modified bank JPM.
RO A.2    The candidate will be provided with a set of Core Exit Thermocouple data and will determine if the required OPERABILITY is met using SO23-3-3.35, PAMI / Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel Checks. The critical steps include identifying any out-of-service thermocouples and correctly determining OPERABILITY of the Core Exit Thermocouple System. This is a new JPM.
RO A.3    The candidate will be required to calculate stay time based on a maintenance activity. The critical steps require determining the optimum total dose using either time, distance or shielding for performing the task.
This is a modified bank JPM.
RO A.4    N/A NUREG-1021, Revision 9.1              2 of 2        SONGS Oct 2009 RO ES-301-1 Rev 1


RO A.1.b The candidate will calculate Time-to-Boil per SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin. The critical steps include correctly interpreting curves within tolerances and performing the final calculation within given tolerances. This is a
Appendix C                                    JPM WORKSHEET                                  Form ES-C-1 Facility: SONGS JPM # NRC RO A.1.a                  Task #185300      K/A #2.1.23        4.3/4.4


modified bank JPM.
==Title:==
 
Perform Reactor Coolant System Inventory Balance Calculations Examinee (Print):
RO A.2 The candidate will be provided with a set of Core Exit Thermocouple data and will determine if the requir ed OPERABILITY is met using SO23-3-3.35, PAMI / Safe Shutdown M onthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly
 
Channel Checks. The critical steps include identifying any out-of-service thermocouples and correctly determini ng OPERABILITY of the Core Exit Thermocouple System. This is a new JPM.
 
RO A.3 The candidate will be required to calculate stay time based on a maintenance activity. The critical steps require determining the optimum total dose using either time, distance or shielding for performing the task.
This is a modified bank JPM.
 
RO A.4 N/A
 
Appendix C JPM WORKSHEET Form ES-C-1 Page 1 of 9  SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc        Facility: SONGS JPM # NRC RO A.1.a Task #185300 K/A #2.1.23          4.3/4.4 Title: Perform Reactor Coolant System Inventory Balance Calculations Examinee (Print):
Testing Method:
Testing Method:
Simulated Performance:     Classroom:   X Actual Performance: X Simulator:
Simulated Performance:                                       Classroom:     X Actual Performance:             X                           Simulator:
Plant:
Plant:
READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue. When you complete the task successfully, the objective for this JPM will be satisfied.
READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.
Initial Conditions:
When you complete the task successfully, the objective for this JPM will be satisfied.
Given the following conditions: Unit 2 is operating at 100% power. The Plant Computer System Wate r Inventory Balance Program is not available. The previous shift started a manual Reactor Coolant System Inventory Balance at 1630 per SO23-3-3.37, Reactor Coolant System Inventory Balance, Atta chment 3, Manual Leak Rate Calculation. Power change is NOT in progress.
Initial Conditions:     Given the following conditions:
Initiating Cue:
* Unit 2 is operating at 100% power.
The Control Room Supervisor directs you to COMPLETE the Reactor Coolant System Inventory Balance per SO23-3-3.37, Reactor Coolant System Inventory Balance, Attachment 3, Manual Leak Rate Calculation.
* The Plant Computer System Water Inventory Balance Program is not available.
The following final data was obtained at 1835: T AVG is 567.2°F. VCT level is 44.3%. Pressurizer level is 53.4%. Quench Tank Level is 74.4%. Safety Injection Tank SIT-007 is 80.1% narrow range. Safety Injection Tank SIT-008 is 81.3% narrow range. Safety Injection Tank SIT-007 is 80.9% narrow range. Safety Injection Tank SIT-010 is 82.0% narrow range. There is no known RCS in-leakage.
* The previous shift started a manual Reactor Coolant System Inventory Balance at 1630 per SO23-3-3.37, Reactor Coolant System Inventory Balance, Attachment 3, Manual Leak Rate Calculation.
Task Standard: Locate and correctly perform Critical Steps of SO23-3-3.37, Attachment 3.
* Power change is NOT in progress.
Appendix C JPM WORKSHEET Form ES-C-1 Page 2 of 9 SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc Required Materials: SO23-3-3.37, Reactor Coolant Sy stem Inventory Balance, Attachment 3, Manual Leak Rate Calculation, Rev. 29.
Initiating Cue:         The Control Room Supervisor directs you to COMPLETE the Reactor Coolant System Inventory Balance per SO23-3-3.37, Reactor Coolant System Inventory Balance, Attachment 3, Manual Leak Rate Calculation.
The following final data was obtained at 1835:
* TAVG is 567.2°F.
* VCT level is 44.3%.
* Pressurizer level is 53.4%.
* Quench Tank Level is 74.4%.
* Safety Injection Tank SIT-007 is 80.1% narrow range.
* Safety Injection Tank SIT-008 is 81.3% narrow range.
* Safety Injection Tank SIT-007 is 80.9% narrow range.
* Safety Injection Tank SIT-010 is 82.0% narrow range.
* There is no known RCS in-leakage.
Task Standard:           Locate and correctly perform Critical Steps of SO23-3-3.37, Attachment 3.
Page 1 of 9                                         SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc


Validation Time: 20 minutes Time Critical: N/A Completion Time: ________ minutes Comments:   Result: SAT UNSAT   Examiner (Print / Sign): Date:
Appendix C                              JPM WORKSHEET                            Form ES-C-1 Required Materials: SO23-3-3.37, Reactor Coolant System Inventory Balance, Attachment 3, Manual Leak Rate Calculation, Rev. 29.
Appendix C JPM WORKSHEET Form ES-C-1 Page 3 of 9 SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc CLASSROOM SETUP EXAMINER: PROVIDE the Examinee with a copy of:  SO23-3-3.37, Reactor Coolant System Inventory Balan ce, Attachment 3, Manual Leak Rate Calculation. INITIAL through Step 2.6. COMPLETE Initial Data Column on Table 1. MARK Step 3.2 with "Stop Here."  INFORM examinee that any independent review requirements (Procedure Steps 2.8 and 2.9.3) need NOT be completed.
Validation Time:     20 minutes Time Critical: N/A Completion Time:   ________ minutes Comments:
Result:   SAT         UNSAT Examiner (Print / Sign):                                                 Date:
Page 2 of 9                                   SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc


Appendix C JPM STEPS Form ES-C-1 Page 4 of 9  SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc          - Check Mark Denotes Critical Step START TIME:
Appendix C                           JPM WORKSHEET                        Form ES-C-1 CLASSROOM SETUP EXAMINER:
Perform Step: 1 Record all final data and perfo rm calculations on Table 1: Perform and Record time calculations.
PROVIDE the Examinee with a copy of:
Standard:
* SO23-3-3.37, Reactor Coolant System Inventory Balance, Attachment 3, Manual Leak Rate Calculation.
RECORD all final data and PERFORM calculations:  RECORD 1835 as Final Time then SUBTRACT 1633 -1835 =
* INITIAL through Step 2.6.
+122 minutes. RECORD +125 minutes.
* COMPLETE Initial Data Column on Table 1.
Comment: SAT      UNSAT    Examiner Note: The Table 1 data recording and calculations can be performed in any order.
* MARK Step 3.2 with Stop Here.
Perform Step: 2 Record all final data and perfo rm calculations on Table 1:  Perform and record VCT calculations.
* INFORM examinee that any independent review requirements (Procedure Steps 2.8 and 2.9.3) need NOT be completed.
Standard:
Page 3 of 9                             SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc
RECORD all final data and PERFORM calculations:  RECORD 44.3% as Final VCT Level then SUBTRACT 44.3% -
46.0% and MULTIPLY 1.7% x 38.
5 gal/% = +65.45 gallons. RECORD +65.45 gallons.
Comment: SAT      UNSAT    Perform Step: 3 Record all final data and perfo rm calculations on Table 1:  Perform and record PZR calculations.
Standard:
RECORD all final data and PERFORM calculations:  RECORD 53.4% as Final PZR Level then SUBTRACT 53.4% -
53.5% and MULTIPLY 0.1% x 52.9 gal/% = +5.29 gallons. RECORD +5.29 gallons.
Comment: SAT      UNSAT    Perform Step: 4 Record all final data and perfo rm calculations on Table 1:  Perform and record TAVG calculations.
Standard:
RECORD all final data and PERFORM calculations:  RECORD 567.2°F as Final T AVG then SUBTRACT 567.2°F -
567.4°F and MULTIPLY 0.2°F x -87.07 gal/degree = -17.4 gallons. RECORD -17.4 gallons.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 5 of 9  SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc Perform Step: 5 Record all final data and perfo rm calculations on Table 1:  Perform and record SIT-008 calculations.
Standard:
RECORD all final data and PERFORM calculations:  RECORD 81.3% as Final SIT-008 level then SUBTRACT 81.3% - 81.3% = 0 % and MULTIPLY 0% x 52.9 gal/% = 0 gallons. RECORD 0.0 gallons.
Comment: SAT      UNSAT    Perform Step: 6 Record all final data and perfo rm calculations on Table 1:  Perform and record SIT-007 calculations.
Standard:
RECORD all final data and PERFORM calculations:  RECORD 80.1% as Final SIT-007 level then SUBTRACT 80.1% - 80.1% = 0 % and MULTIPLY 0% x 52.9 gal/% = 0 gallons. RECORD 0.0 gallons.
Comment: SAT      UNSAT    Perform Step: 7 Record all final data and perfo rm calculations on Table 1:  Perform and record SIT-009 calculations.
Standard:
RECORD all final data and PERFORM calculations:  RECORD 80.9% as Final SIT-009 level then SUBTRACT 80.9% - 80.9% = 0 % and MULTIPLY 0% x 52.9 gal/% = 0 gallons. RECORD 0.0 gallons.
Comment: SAT      UNSAT    Perform Step: 8 Record all final data and perfo rm calculations on Table 1:  Perform and record SIT-010 calculations.
Standard:
RECORD all final data and PERFORM calculations:  RECORD 82.0% as Final SIT-010 level then SUBTRACT 82.0% - 82.0% = 0 % and MULTIPLY 0% x 52.9 gal/% = 0 gallons. RECORD 0.0 gallons.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 6 of 9  SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc Perform Step: 9 Record all final data and perfo rm calculations on Table 1:  Perform and record Quench Tank calculations.
Standard:
RECORD all final data and PERFORM calculations:  RECORD 74.4% as Final Quench Tank level. Examiner Cue: Table 1 has been Independently Verified.
Comment: SAT      UNSAT      Perform Step: 10 Total Leak Rate Calculation:  Add volume changes from Table 1: (Algebraic sum) (Circle sign) gal VCT    (+) (-)  ____ gal Standard:
RECORD all final data and PERFORM calculations:  RECORD VCT change as 65.45 gallons and CIRCLE (+).
Comment: SAT      UNSAT    Perform Step: 11 Total Leak Rate Calculation:  Add volume changes from Table 1: (Algebraic sum) (Circle sign) gal PZR    (+) (-)  ____ gal Standard:
RECORD all final data and PERFORM calculations:  RECORD PZR change as 5.29 gallons and CIRCLE (+).
Comment: SAT      UNSAT    Perform Step: 12 Total Leak Rate Calculation:  Add volume changes from Table 1: (Algebraic sum) (Circle sign) gal T AVG    (+) (-)  ____ gal Standard:
RECORD all final data and PERFORM calculations:  RECORD T AVG change as 17.4 gallons and CIRCLE (-).
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 7 of 9 SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc Perform Step: 13 Total Leak Rate Calculation:  Add volume changes from Table 1: (Algebraic sum) (Circle sign) gal VCT    (+) (-)  ____ gal gal PZR    (+) (-)  ____ gal gal T AVG    (+) (-)  ____ gal        Subtotal  ____ gal Standard:
RECORD all final data and PERFORM calculations:  ADD (+65.45) + (+5.29) +
(-17.4) = +53.34 gallons. RECORD Total change as 53.34 gallons.
Comment: SAT      UNSAT    Perform Step: 14 Total Leak Rate Calculation:  Calculate (divide):  Subtotal                    ____ gal  Test Duration       
÷ ____ min  Calculated Total Leak Rate    ____ gpm


Identified In-leakage   + ____ gpm  TOTAL LEAK RATE  =  ____ gpm Standard:
Appendix C                              JPM STEPS                              Form ES-C-1
RECORD all final data and PERFORM calculations: DIVIDE 53.34 gallons by 125 minutes =
- Check Mark Denotes Critical Step                    START TIME:
0.43 +/- 0.03 gpm (to nearest 1/100 th). RECORD 0.43 +/- 0.03 gpm for Calculated Total Leak Rate. RECORD zero (0) fo r Identified In-leakage. RECORD 0.43 +/- 0.03 gpm for Total Leak Rate. Examiner Cue: Total Leak Rate Calculat ion has been Independently Verified.
Perform Step: 1   Record all final data and perform calculations on Table 1:
Comment: SAT     UNSAT     Perform Step: 15 If Total Leak Rate, Step 2.9.2, is  1 gpm, then Mark N/A Sections 2.10 and 2.11, and Circle N/A for Identified Leak Rate and Unidentified Leak Rate in Step 3.1. (Mark N/A if Total Leak Rate > 1 gpm.)
* Perform and Record time calculations.
Standard:
Standard:         RECORD all final data and PERFORM calculations:
RECORD final data: DETERMINE leakrate to be less than 1 gpm.
* RECORD 1835 as Final Time then SUBTRACT 1633 -1835 =
MARK N/A Sections 2.10 and 2.11. CIRCLE N/A for Identified Leak Ra te and Unidentified Leak Rate in Step 3.1.
                          +122 minutes.
Comment: SAT     UNSAT Appendix C JPM STEPS Form ES-C-1 Page 8 of 9  SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc Perform Step: 16 Acceptance Criteria Result.
* RECORD +125 minutes.
Standard: RECORD total leakrate value, DETERMINE total leakrate  1gpm and CIRCLE YES for ACCEPTANCE CRITERIA. Terminating Cue: This JPM is complete.
Comment:                                                          SAT        UNSAT Examiner Note:    The Table 1 data recording and calculations can be performed in any order.
Comment: SAT     UNSAT     STOP TIME:
Perform Step: 2  Record all final data and perform calculations on Table 1:
Appendix C JPM CUE SHEET Form ES-C-1 Page 9 of 9 SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc INITIAL CONDITIONS: Given the following conditions:  Unit 2 is operating at 100% power. The Plant Computer System Water Inventory Balance Program is not available. The previous shift started a manual Reactor Coolant System Inventory Balance at 1630 per SO23-3-3.37, Reactor Coolant System Inventory Balance, Attachment
* Perform and record VCT calculations.
Standard:          RECORD all final data and PERFORM calculations:
* RECORD 44.3% as Final VCT Level then SUBTRACT 44.3% -
46.0% and MULTIPLY 1.7% x 38.5 gal/% = +65.45 gallons.
* RECORD +65.45 gallons.
Comment:                                                           SAT       UNSAT Perform Step: 3  Record all final data and perform calculations on Table 1:
* Perform and record PZR calculations.
Standard:         RECORD all final data and PERFORM calculations:
* RECORD 53.4% as Final PZR Level then SUBTRACT 53.4% -
53.5% and MULTIPLY 0.1% x 52.9 gal/% = +5.29 gallons.
* RECORD +5.29 gallons.
Comment:                                                           SAT       UNSAT Perform Step: 4  Record all final data and perform calculations on Table 1:
* Perform and record TAVG calculations.
Standard:         RECORD all final data and PERFORM calculations:
* RECORD 567.2°F as Final TAVG then SUBTRACT 567.2°F -
567.4°F and MULTIPLY 0.2°F x -87.07 gal/degree = -17.4 gallons.
* RECORD -17.4 gallons.
Comment:                                                           SAT       UNSAT Page 4 of 9                             SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc


3, Manual Leak Rate Calculation. Power change is NOT in progress.  
Appendix C                          JPM STEPS                              Form ES-C-1 Perform Step: 5 Record all final data and perform calculations on Table 1:
* Perform and record SIT-008 calculations.
Standard:      RECORD all final data and PERFORM calculations:
* RECORD 81.3% as Final SIT-008 level then SUBTRACT 81.3% -
81.3% = 0 % and MULTIPLY 0% x 52.9 gal/% = 0 gallons.
* RECORD 0.0 gallons.
Comment:                                                        SAT        UNSAT Perform Step: 6 Record all final data and perform calculations on Table 1:
* Perform and record SIT-007 calculations.
Standard:      RECORD all final data and PERFORM calculations:
* RECORD 80.1% as Final SIT-007 level then SUBTRACT 80.1% -
80.1% = 0 % and MULTIPLY 0% x 52.9 gal/% = 0 gallons.
* RECORD 0.0 gallons.
Comment:                                                        SAT        UNSAT Perform Step: 7 Record all final data and perform calculations on Table 1:
* Perform and record SIT-009 calculations.
Standard:      RECORD all final data and PERFORM calculations:
* RECORD 80.9% as Final SIT-009 level then SUBTRACT 80.9% -
80.9% = 0 % and MULTIPLY 0% x 52.9 gal/% = 0 gallons.
* RECORD 0.0 gallons.
Comment:                                                        SAT        UNSAT Perform Step: 8 Record all final data and perform calculations on Table 1:
* Perform and record SIT-010 calculations.
Standard:      RECORD all final data and PERFORM calculations:
* RECORD 82.0% as Final SIT-010 level then SUBTRACT 82.0% -
82.0% = 0 % and MULTIPLY 0% x 52.9 gal/% = 0 gallons.
* RECORD 0.0 gallons.
Comment:                                                        SAT        UNSAT Page 5 of 9                          SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc


INITIATING CUE: The Control Room Supervisor directs you to COMPLETE the Reactor Coolant System Inventory Balance per SO23-3-3.37, Reactor Coolant System Inventory Balance, Attachment 3, Manual Leak Rate Calculation. The following final data was obtained at 1835: TAVG is 567.2°F. VCT level is 44.3%. Pressurizer level is 53.4%. Quench Tank Level is 74.4%. Safety Injection Tank SIT-007 is 80.1% narrow range. Safety Injection Tank SIT-008 is 81.3% narrow range. Safety Injection Tank SIT-009 is 80.9% narrow range. Safety Injection Tank SIT-010 is 82.0% narrow range. There is no known RCS in-leakage. 
Appendix C                            JPM STEPS                              Form ES-C-1 Perform Step: 9  Record all final data and perform calculations on Table 1:
* Perform and record Quench Tank calculations.
Standard:        RECORD all final data and PERFORM calculations:
* RECORD 74.4% as Final Quench Tank level.
Examiner Cue:    Table 1 has been Independently Verified.
Comment:                                                        SAT        UNSAT Perform Step: 10 Total Leak Rate Calculation:
* Add volume changes from Table 1:
(Algebraic sum) (Circle sign) gal VCT (+) (-) ____ gal Standard:        RECORD all final data and PERFORM calculations:
* RECORD VCT change as 65.45 gallons and CIRCLE (+).
Comment:                                                        SAT        UNSAT Perform Step: 11 Total Leak Rate Calculation:
* Add volume changes from Table 1:
(Algebraic sum) (Circle sign) gal PZR (+) (-) ____ gal Standard:        RECORD all final data and PERFORM calculations:
* RECORD PZR change as 5.29 gallons and CIRCLE (+).
Comment:                                                        SAT        UNSAT Perform Step: 12 Total Leak Rate Calculation:
* Add volume changes from Table 1:
(Algebraic sum) (Circle sign) gal TAVG (+) (-) ____ gal Standard:        RECORD all final data and PERFORM calculations:
* RECORD TAVG change as 17.4 gallons and CIRCLE (-).
Comment:                                                        SAT        UNSAT Page 6 of 9                           SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc


Appendix C JPM WORKSHEET Form ES-C-1 Page 1 of 6 SONGS Oct 2009 NRC RO Admin JPM A.1.b Rev 0.doc         Facility: SONGS JPM # NRC RO A.1.b  Task #188898 K/A #2.1.25 3.9/4.2 Title: Determine Time to Boil Examinee (Print):
Appendix C                               JPM STEPS                          Form ES-C-1 Perform Step: 13  Total Leak Rate Calculation:
Testing Method:
* Add volume changes from Table 1:
Simulated Performance:  Classroom:    X  Actual Performance: X  Simulator:
(Algebraic sum) (Circle sign) gal VCT (+) (-) ____ gal gal PZR (+) (-) ____ gal gal TAVG (+) (-) ____ gal Subtotal ____ gal Standard:         RECORD all final data and PERFORM calculations:
Plant:    READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue. When you complete the task successfully, the objective for this JPM will be satisfied.
* ADD (+65.45) + (+5.29) + (-17.4) = +53.34 gallons.
Initial Conditions: Given the following conditions:  Unit 3 is in MODE 6 after a 420 day run. The core reload is complete with 101 new fuel assemblies. Reactor Coolant System level is at Midloop (27 inches) to remove the Nozzle Dams in place on St eam Generators E-088 and E-089. Shutdown Cooling Heat Exchanger inlet temperature is 115.5 °F. The Reactor has been shut down for 22 days. The Pressurizer Manway is removed and is being used as the RCS vent. Initiating Cue: The Shift Manager directs you to PERFORM the followingSO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin. Outage specific Time to Boil Data Transmittal has NOT been provided by Reactor Engineering.
* RECORD Total change as 53.34 gallons.
Task Standard: Locate and correctly perform Critical Steps of SO23-5-1.8.1, Attachment 9.  
Comment:                                                          SAT      UNSAT Perform Step: 14 Total Leak Rate Calculation:
* Calculate (divide):
Subtotal                      ____ gal Test Duration                ÷ ____ min Calculated Total Leak Rate ____ gpm Identified In-leakage        + ____ gpm TOTAL LEAK RATE              = ____ gpm Standard:         RECORD all final data and PERFORM calculations:
* DIVIDE 53.34 gallons by 125 minutes = 0.43 +/- 0.03 gpm (to nearest 1/100th).
* RECORD 0.43 +/- 0.03 gpm for Calculated Total Leak Rate.
* RECORD zero (0) for Identified In-leakage.
* RECORD 0.43 +/- 0.03 gpm for Total Leak Rate.
Examiner Cue:    Total Leak Rate Calculation has been Independently Verified.
Comment:                                                           SAT      UNSAT Perform Step: 15 If Total Leak Rate, Step 2.9.2, is  1 gpm, then Mark N/A Sections 2.10 and 2.11, and Circle N/A for Identified Leak Rate and Unidentified Leak Rate in Step 3.1. (Mark N/A if Total Leak Rate > 1 gpm.)
Standard:         RECORD final data:
* DETERMINE leakrate to be less than 1 gpm.
* MARK N/A Sections 2.10 and 2.11.
* CIRCLE N/A for Identified Leak Rate and Unidentified Leak Rate in Step 3.1.
Comment:                                                          SAT      UNSAT Page 7 of 9                              SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc


Required Materials: SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin, Rev. 20.
Appendix C                          JPM STEPS                          Form ES-C-1 Perform Step: 16 Acceptance Criteria Result.
Validation Time: 15 minutes Time Critical: N/A Completion Time: ________ minutes
Standard:        RECORD total leakrate value, DETERMINE total leakrate 1gpm and CIRCLE YES for ACCEPTANCE CRITERIA.
Terminating Cue: This JPM is complete.
Comment:                                                   SAT        UNSAT STOP TIME:
Page 8 of 9                          SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc


Comments:
Appendix C                     JPM CUE SHEET                          Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:
Appendix C JPM WORKSHEET Form ES-C-1 Page 2 of 6 SONGS Oct 2009 NRC RO Admin JPM A.1.b Rev 0.doc Result:  SAT  UNSAT  Examiner (Print / Sign):  Date: 
* Unit 2 is operating at 100% power.
* The Plant Computer System Water Inventory Balance Program is not available.
* The previous shift started a manual Reactor Coolant System Inventory Balance at 1630 per SO23-3-3.37, Reactor Coolant System Inventory Balance, Attachment 3, Manual Leak Rate Calculation.
* Power change is NOT in progress.
INITIATING CUE:    The Control Room Supervisor directs you to COMPLETE the Reactor Coolant System Inventory Balance per SO23-3-3.37, Reactor Coolant System Inventory Balance, Attachment 3, Manual Leak Rate Calculation. The following final data was obtained at 1835:
* TAVG is 567.2°F.
* VCT level is 44.3%.
* Pressurizer level is 53.4%.
* Quench Tank Level is 74.4%.
* Safety Injection Tank SIT-007 is 80.1% narrow range.
* Safety Injection Tank SIT-008 is 81.3% narrow range.
* Safety Injection Tank SIT-009 is 80.9% narrow range.
* Safety Injection Tank SIT-010 is 82.0% narrow range.
* There is no known RCS in-leakage.
Page 9 of 9                        SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc


Appendix C JPM WORKSHEET Form ES-C-1 Page 3 of 6 SONGS Oct 2009 NRC RO Admin JPM A.1.b Rev 0.doc CLASSROOM SETUP EXAMINER: PROVIDE the examinee with a copy of:  SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of the RCS Time-to-Boil Margin.
Appendix C                                   JPM WORKSHEET                                   Form ES-C-1 Facility: SONGS JPM # NRC RO A.1.b                 Task #188898      K/A #2.1.25          3.9/4.2
Appendix C JPM STEPS Form ES-C-1 Page 4 of 6 SONGS Oct 2009 NRC RO Admin JPM A.1.b Rev 0.doc          - Check Mark Denotes Critical Step START TIME:
Perform Step: 1 Determine Time-to-Boil margin temperature as follows:
BM act = BM ref x L cf x T cf x N cf  Determine BM ref Standard: REFERENCE BM ref  Table and INTERPOLATE between 20 and 30 days as follows:


[(39.09 - 32.4) X .2] + 32.4 =
==Title:==
33.74 minutes Comment: SAT      UNSAT      Perform Step: 2 Determine Time-to-Boil margin temperature as follows:  
Determine Time to Boil Examinee (Print):
Testing Method:
Simulated Performance:                                        Classroom:      X Actual Performance:              X                            Simulator:
Plant:
READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.
When you complete the task successfully, the objective for this JPM will be satisfied.
Initial Conditions:      Given the following conditions:
* Unit 3 is in MODE 6 after a 420 day run.
* The core reload is complete with 101 new fuel assemblies.
* Reactor Coolant System level is at Midloop (27 inches) to remove the Nozzle Dams in place on Steam Generators E-088 and E-089.
* Shutdown Cooling Heat Exchanger inlet temperature is 115.5 °F.
* The Reactor has been shut down for 22 days.
* The Pressurizer Manway is removed and is being used as the RCS vent.
Initiating Cue:          The Shift Manager directs you to PERFORM the following:
* SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin.
* Outage specific Time to Boil Data Transmittal has NOT been provided by Reactor Engineering.
Task Standard:           Locate and correctly perform Critical Steps of SO23-5-1.8.1, Attachment 9.
Required Materials: SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin, Rev. 20.
Validation Time:          15 minutes    Time Critical: N/A    Completion Time:    ________ minutes Comments:
Page 1 of 6                SONGS Oct 2009 NRC RO Admin JPM A.1.b Rev 0.doc


BM act = BM ref x L cf x T cf x N cf  Determine L cf Standard: REFERENCE L cf Table and DETERMINE L cf to be 1.008 at 27 inches.
Appendix C                            JPM WORKSHEET                        Form ES-C-1 Result:   SAT       UNSAT Examiner (Print / Sign):                                             Date:
Comment: SAT     UNSAT     Perform Step: 3 Determine Time-to-Boil margin temperature as follows:  
Page 2 of 6            SONGS Oct 2009 NRC RO Admin JPM A.1.b Rev 0.doc


BM act = BM ref x L cf x T cf x N cf  Determine T cf Standard:
Appendix C                        JPM WORKSHEET                        Form ES-C-1 CLASSROOM SETUP EXAMINER:
SELECT T cf formula of T cf = (212 - T hot) / 92. Comment: SAT      UNSAT      Perform Step: 4 Determine Time-to-Boil margin temperature as follows:
PROVIDE the examinee with a copy of:
* SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of the RCS Time-to-Boil Margin.
Page 3 of 6        SONGS Oct 2009 NRC RO Admin JPM A.1.b Rev 0.doc


BM act = BM ref x L cf x T cf x N cf  Determine T cf Standard: CALCULATE T cf = (212 - 115.5) / 92 =
Appendix C                              JPM STEPS                        Form ES-C-1
1.049 +/- 0.002 Comment: SAT     UNSAT Appendix C JPM STEPS Form ES-C-1 Page 5 of 6 SONGS Oct 2009 NRC RO Admin JPM A.1.b Rev 0.doc Perform Step: 5 Determine Time-to-Boil margin temperature as follows:
- Check Mark Denotes Critical Step                    START TIME:
BM act = BM ref x L cf x T cf x N cf  Determine N cf  where  N cf = 217 / (217- # new assemblies)
Perform Step: 1    Determine Time-to-Boil margin temperature as follows:
Standard: CALCULATE N cf = 217 / (217-101) =
BMact = BMref x Lcf x Tcf x Ncf
1.87 Comment: SAT     UNSAT     Perform Step: 6 Determine Time-to-Boil margin temperature as follows:  
* Determine BMref Standard:         REFERENCE BMref Table and INTERPOLATE between 20 and 30 days as follows:
[(39.09 - 32.4) X .2] + 32.4 = 33.74 minutes Comment:                                                           SAT   UNSAT Perform Step: 2  Determine Time-to-Boil margin temperature as follows:
BMact = BMref x Lcf x Tcf x Ncf
* Determine Lcf Standard:          REFERENCE Lcf Table and DETERMINE Lcf to be 1.008 at 27 inches.
Comment:                                                          SAT  UNSAT Perform Step: 3    Determine Time-to-Boil margin temperature as follows:
BMact = BMref x Lcf x Tcf x Ncf
* Determine Tcf Standard:           SELECT Tcf formula of Tcf = (212 - Thot) / 92.
Comment:                                                           SAT   UNSAT Perform Step: Determine Time-to-Boil margin temperature as follows:
BMact = BMref x Lcf x Tcf x Ncf
* Determine Tcf Standard:          CALCULATE Tcf = (212 - 115.5) / 92 = 1.049 +/- 0.002 Comment:                                                          SAT  UNSAT Page 4 of 6        SONGS Oct 2009 NRC RO Admin JPM A.1.b Rev 0.doc


BM act = BM ref x L cf x T cf x N cf Standard:
Appendix C                            JPM STEPS                              Form ES-C-1 Perform Step: 5  Determine Time-to-Boil margin temperature as follows:
BM act = (33.74 min) X (1.008)
BMact = BMref x Lcf x Tcf x Ncf
X (1.049) X (1.87) =
* Determine Ncf where Ncf = 217 / (217- # new assemblies)
66.7 +/- 2.5 minutes Terminating Cue: This JPM is complete.
Standard:        CALCULATE Ncf = 217 / (217-101) = 1.87 Comment:                                                        SAT      UNSAT Perform Step: 6 Determine Time-to-Boil margin temperature as follows:
Comment: SAT     UNSAT       STOP TIME:
BMact = BMref x Lcf x Tcf x Ncf Standard:        BMact = (33.74 min) X (1.008) X (1.049) X (1.87) = 66.7 +/- 2.5 minutes Terminating Cue: This JPM is complete.
Appendix C JPM CUE SHEET Form ES-C-1 Page 6 of 6 SONGS Oct 2009 NRC RO Admin JPM A.1.b Rev 0.doc INITIAL CONDITIONS: Given the following conditions:  Unit 3 is in MODE 6 after a 420 day run. The core reload is complete with 101 new fuel assemblies. Reactor Coolant System level is at Midloop (27 inches) to remove the Nozzle Dams in place on Steam Generators E-088 and E-089. Shutdown Cooling Heat Exchanger inlet temperature is 115.5 °F. The Reactor has been shut down for 22 days. The Pressurizer Manway is removed and is being used
Comment:                                                         SAT       UNSAT STOP TIME:
Page 5 of 6     SONGS Oct 2009 NRC RO Admin JPM A.1.b Rev 0.doc


as the RCS vent.  
Appendix C                      JPM CUE SHEET                        Form ES-C-1 INITIAL CONDITIONS:  Given the following conditions:
* Unit 3 is in MODE 6 after a 420 day run.
* The core reload is complete with 101 new fuel assemblies.
* Reactor Coolant System level is at Midloop (27 inches) to remove the Nozzle Dams in place on Steam Generators E-088 and E-089.
* Shutdown Cooling Heat Exchanger inlet temperature is 115.5 °F.
* The Reactor has been shut down for 22 days.
* The Pressurizer Manway is removed and is being used as the RCS vent.
INITIATING CUE:      The Shift Manager directs you to PERFORM the following:
* SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin.
* Outage specific Time to Boil Data Transmittal has NOT been provided by Reactor Engineering.
Page 6 of 6      SONGS Oct 2009 NRC RO Admin JPM A.1.b Rev 0.doc


INITIATING CUE: The Shift Manager directs you to PERFORM the following:  SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin. Outage specific Time to Boil Data Transmittal has NOT been provided by Reactor Engineering.  
Appendix C                                    JPM WORKSHEET                                  Form ES-C-1 Facility: SONGS JPM # NRC RO A.2                    Task #185785      K/A #2.2.12          3.7/4.1


Appendix C JPM WORKSHEET Form ES-C-1 Page 1 of 8 SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc        Facility: SONGS JPM # NRC RO A.2  Task #185785 K/A #2.2.12 3.7/4.1 Title: Perform Core Exit Thermocouple Channel Checks Examinee (Print):
==Title:==
Perform Core Exit Thermocouple Channel Checks Examinee (Print):
Testing Method:
Testing Method:
Simulated Performance:   Classroom:   X Actual Performance: X Simulator:
Simulated Performance:                                       Classroom:     X Actual Performance:             X                           Simulator:
Plant:   READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue. When you complete the task successfully, the objective for this JPM will be satisfied.
Plant:
Initial Conditions: Given the following conditions: Unit 2 is in MODE 1 at 100% power. The monthly surveillance for the Core Exit Thermocouple and Heated Junction Thermocouple System is due.
READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.
Initiating Cue: The Shift Manager directs you to PERFORM the following: SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel Checks.
When you complete the task successfully, the objective for this JPM will be satisfied.
Core Exit Thermocouple and Heated Junction Thermocouple data is attached. Task Standard: Locate and correctly perform Critical Steps SO23-3-3.35, Attachment 2.
Initial Conditions:     Given the following conditions:
* Unit 2 is in MODE 1 at 100% power.
* The monthly surveillance for the Core Exit Thermocouple and Heated Junction Thermocouple System is due.
Initiating Cue:         The Shift Manager directs you to PERFORM the following:
* SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel Checks.
* Core Exit Thermocouple and Heated Junction Thermocouple data is attached.
Task Standard:           Locate and correctly perform Critical Steps SO23-3-3.35, Attachment 2.
Required Materials: SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Rev. 22.
Required Materials: SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Rev. 22.
Validation Time: 25 minutes Time Critical: N/A Completion Time: ________ minutes Comments:   Result: SAT UNSAT   Examiner (Print / Sign): Date:
Validation Time:         25 minutes   Time Critical: N/A     Completion Time:   ________ minutes Comments:
Appendix C JPM WORKSHEET Form ES-C-1 Page 2 of 8 SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc CLASSROOM SETUP EXAMINER: PROVIDE the examinee with a copy of: SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel Checks. INITIAL through Step 1.4. MARK "Stop Here" at Step 3.1. Qualified Safety Parameter Display Sy stem (QSPDS) pages 611, 622, and 721. Core Exit Thermocouple Data (part of JPM Cue Sheet).  
Result:   SAT             UNSAT Examiner (Print / Sign):                                                           Date:
Page 1 of 8                 SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc
 
Appendix C                        JPM WORKSHEET                        Form ES-C-1 CLASSROOM SETUP EXAMINER:
PROVIDE the examinee with a copy of:
* SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel Checks.
* INITIAL through Step 1.4.
* MARK Stop Here at Step 3.1.
* Qualified Safety Parameter Display System (QSPDS) pages 611, 622, and 721.
* Core Exit Thermocouple Data (part of JPM Cue Sheet).
Page 2 of 8        SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc


Appendix C JPM STEPS Form ES-C-1 Page 3 of 8 SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc        - Check Mark Denotes Critical Step START TIME:
Appendix C                           JPM STEPS                       Form ES-C-1
Perform Step: 1 Record the following: (QSPDS page 611) COLD LEG 1A TEMP. COLD LEG 1B TEMP.
- Check Mark Denotes Critical Step                 START TIME:
Standard:
Perform Step: 1   Record the following: (QSPDS page 611)
RECORD 541°F for Cold Leg 1A and Cold Leg 1B temperatures.
* COLD LEG 1A TEMP.
Comment: SAT     UNSAT     Perform Step: 2 Verify Acceptance Criteria: QSPDS 1A & 1B Cold Leg Temps within 5°F?
* COLD LEG 1B TEMP.
Standard:
Standard:         RECORD 541°F for Cold Leg 1A and Cold Leg 1B temperatures.
CHECK YES box for QSPDS 1A & 1B Cold Leg temperatures within 5°F. Comment: SAT     UNSAT     Perform Step: 3 Record the following: (QSPDS page 611) COLD LEG 2A TEMP.
Comment:                                                     SAT     UNSAT Perform Step: 2   Verify Acceptance Criteria:
COLD LEG 2B TEMP.
* QSPDS 1A & 1B Cold Leg Temps within 5°F?
Standard:
Standard:         CHECK YES box for QSPDS 1A & 1B Cold Leg temperatures within 5°F.
RECORD 540°F for Cold Leg 2A and Cold Leg 2B temperatures.
Comment:                                                     SAT     UNSAT Perform Step: 3   Record the following: (QSPDS page 611)
Comment: SAT     UNSAT     Perform Step: 4 Verify Acceptance Criteria: QSPDS 2A & 2B Cold Leg Temps within 5°F?
* COLD LEG 2A TEMP.
Standard:
* COLD LEG 2B TEMP.
CHECK YES box for QSPDS 2A & 2B Cold Leg temperatures within 5°F. Comment: SAT     UNSAT     Perform Step: 5 Record the following: (QSPDS page 611) REP CET TEMPERATURE (QSPDS A).
Standard:         RECORD 540°F for Cold Leg 2A and Cold Leg 2B temperatures.
REP CET TEMPERATURE (QSPDS B).
Comment:                                                     SAT     UNSAT Perform Step: 4   Verify Acceptance Criteria:
Standard:
* QSPDS 2A & 2B Cold Leg Temps within 5°F?
RECORD 611°F for REP CET (QSPDS A) and 612°F for REP CET (QSPDS B) temperatures.
Standard:         CHECK YES box for QSPDS 2A & 2B Cold Leg temperatures within 5°F.
Comment: SAT     UNSAT Appendix C JPM STEPS Form ES-C-1 Page 4 of 8 SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc Perform Step: 6 Verify Acceptance Criteria:  REP CET Temperatures within 9°F?
Comment:                                                     SAT     UNSAT Perform Step: 5   Record the following: (QSPDS page 611)
Standard: CHECK YES box for REP CET temperatures within 9°F.
* REP CET TEMPERATURE (QSPDS A).
Comment: SAT      UNSAT      Perform Step: 7  Transfer the Highest operable Cold Leg Temperat ure of Step 2.1.1 into the "Low Limit" of Steps 2.1.6 and 2.1.8.
* REP CET TEMPERATURE (QSPDS B).
Standard:
Standard:         RECORD 611°F for REP CET (QSPDS A) and 612°F for REP CET (QSPDS B) temperatures.
RECORD 541°F in "Low Limit Temp." box for Steps 2.1.6 and 2.1.8.
Comment:                                                     SAT     UNSAT Page 3 of 8       SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc
Comment: SAT      UNSAT      Perform Step: 8  Transfer the Lowest operable REP CET temperatur e of Step 2.1.1 into the "High Limit" of Steps 2.1.6 and 2.1.8.
Standard:
RECORD 611°F in "High Limit Temp." box for Steps 2.1.6 and 2.1.8.
Comment: SAT      UNSAT     Perform Step: 9 Record CET Temperatures from QSPDS "A" Page 731:  Write "INOP" in data spaces for known inoperable CETs. Write 'N/A" for G-20.
Standard:
RECORD N/A for CET G-20 and RE CORD CET Temper atures from QSPDS A Core Exit Thermoc ouple Map (JPM Cue Sheet).
Comment: SAT      UNSAT      Perform Step: 10 Record the total number of CETs which are within "In-Range" limits for each column.
Standard: RECORD the following from QSPDS A Core Exit Thermocouple Map:  QUAD 1 = 5; QUAD 2 = 6; QUAD 3 = 8; QUAD 4 = 6.
Comment: SAT      UNSAT      Perform Step: 11 At least two CETs per Column are "In-Range" for Channel "A" QSPDS:
YES  NO Standard: CHECK YES box.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 5 of 8 SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc Perform Step: 12 Record CET Temperatures from QSPDS "B" Page 731:  Write "INOP" in data spaces for known inoperable CETs.
Standard:
RECORD CET Temperatures from Q SPDS B Core Exit Thermocouple Map (JPM Cue Sheet).
Comment: SAT      UNSAT      Perform Step: 13 Record the total number of CETs wh ich are within the "In-Range" limits for each column.
Standard: RECORD the following from QSPDS B Core Exit Thermocouple Map:  QUAD 1 = 6; QUAD 2 = 7; QUAD 3 = 1; QUAD 4 = 6.
Comment: SAT      UNSAT      Perform Step: 14 At least two CETs per Column are "In-Range" for channel "B" QSPDS:
YES  NO Standard: CHECK NO box.
Comment: SAT      UNSAT      Perform Step: 15 If any CETs are not "In-Range", then ensure a Notification has been initiated, and record NEW Notification numbers in the comments section. Standard: ANNOTATE that a Notification for QSPDS B CET failure has been initiated in the COMMENTS Section.
Comment: SAT      UNSAT      Perform Step: 16 Heated Junction Thermocouple System Channel Check  Record the differential temperatures of the Heated Junction Thermocouples (HJTCs) from QSPDS Page 721 on Table 2.
Standard:
RECORD the differential temper atures of the Heated Junction Thermocouples from QSPD S Page 721 on Table 2.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 6 of 8 SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc Perform Step: 17 At least One Head diffe rential temperature and at least Three Plenum differential temperatures for Channel A fall within the range of 40°F (lower limit) to 200°F (upper limit)?
YES  NO Standard: CHECK YES box.
Comment: SAT      UNSAT      Perform Step: 18 At least One Head diffe rential temperature and at least Three Plenum differential temperatures for Channel B fall within the range of 40°F (lower limit) to 200°F (upper limit)?


YES  NO Standard: CHECK YES box. Terminating Cue: This JPM is complete.
Appendix C                            JPM STEPS                          Form ES-C-1 Perform Step: 6  Verify Acceptance Criteria:
Comment: SAT     UNSAT      STOP TIME:
* REP CET Temperatures within 9°F?
Appendix C JPM CUE SHEET Form ES-C-1 Page 7 of 8 SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc INITIAL CONDITIONS: Given the following conditions:  Unit 2 is in MODE 1 at 100% power. The monthly surveillance for the Core Exit Thermocouple and Heated Junction Thermocouple System is due.
Standard:         CHECK YES box for REP CET temperatures within 9°F.
Comment:                                                        SAT      UNSAT Perform Step: 7  Transfer the Highest operable Cold Leg Temperature of Step 2.1.1 into the "Low Limit" of Steps 2.1.6 and 2.1.8.
Standard:         RECORD 541°F in "Low Limit Temp." box for Steps 2.1.6 and 2.1.8.
Comment:                                                       SAT       UNSAT Perform Step: 8  Transfer the Lowest operable REP CET temperature of Step 2.1.1 into the "High Limit" of Steps 2.1.6 and 2.1.8.
Standard:        RECORD 611°F in "High Limit Temp." box for Steps 2.1.6 and 2.1.8.
Comment:                                                        SAT       UNSAT Perform Step: 9  Record CET Temperatures from QSPDS "A" Page 731:
* Write "INOP" in data spaces for known inoperable CETs.
* Write N/A for G-20.
Standard:        RECORD N/A for CET G-20 and RECORD CET Temperatures from QSPDS A Core Exit Thermocouple Map (JPM Cue Sheet).
Comment:                                                        SAT      UNSAT Perform Step: 10 Record the total number of CETs which are within "In-Range" limits for each column.
Standard:        RECORD the following from QSPDS A Core Exit Thermocouple Map:
* QUAD 1 = 5; QUAD 2 = 6; QUAD 3 = 8; QUAD 4 = 6.
Comment:                                                        SAT      UNSAT Perform Step: 11 At least two CETs per Column are "In-Range" for Channel "A" QSPDS:
YES          NO Standard:        CHECK YES box.
Comment:                                                        SAT      UNSAT Page 4 of 8       SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc


INITIATING CUE: The Shift Manager directs you to PERFORM the following: SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel  
Appendix C                            JPM STEPS                              Form ES-C-1 Perform Step: 12  Record CET Temperatures from QSPDS "B" Page 731:
* Write "INOP" in data spaces for known inoperable CETs.
Standard:        RECORD CET Temperatures from QSPDS B Core Exit Thermocouple Map (JPM Cue Sheet).
Comment:                                                            SAT      UNSAT Perform Step: 13 Record the total number of CETs which are within the "In-Range" limits for each column.
Standard:        RECORD the following from QSPDS B Core Exit Thermocouple Map:
* QUAD 1 = 6; QUAD 2 = 7; QUAD 3 = 1; QUAD 4 = 6.
Comment:                                                            SAT      UNSAT Perform Step: 14 At least two CETs per Column are "In-Range" for channel "B" QSPDS:
YES          NO Standard:        CHECK NO box.
Comment:                                                            SAT      UNSAT Perform Step: 15  If any CETs are not "In-Range", then ensure a Notification has been initiated, and record NEW Notification numbers in the comments section.
Standard:        ANNOTATE that a Notification for QSPDS B CET failure has been initiated in the COMMENTS Section.
Comment:                                                            SAT      UNSAT Perform Step: 16  Heated Junction Thermocouple System Channel Check
* Record the differential temperatures of the Heated Junction Thermocouples (HJTCs) from QSPDS Page 721 on Table 2.
Standard:        RECORD the differential temperatures of the Heated Junction Thermocouples from QSPDS Page 721 on Table 2.
Comment:                                                            SAT      UNSAT Page 5 of 8        SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc


Checks. Core Exit Thermocouple and Heated Junction Thermocouple data is attached.
Appendix C                            JPM STEPS                              Form ES-C-1 Perform Step: 17 At least One Head differential temperature and at least Three Plenum differential temperatures for Channel A fall within the range of 40°F (lower limit) to 200°F (upper limit)?
YES          NO Standard:        CHECK YES box.
Comment:                                                          SAT      UNSAT Perform Step: 18 At least One Head differential temperature and at least Three Plenum differential temperatures for Channel B fall within the range of 40°F (lower limit) to 200°F (upper limit)?
YES          NO Standard:        CHECK YES box.
Terminating Cue:  This JPM is complete.
Comment:                                                          SAT      UNSAT STOP TIME:
Page 6 of 8      SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc


Appendix C JPM CUE SHEET Form ES-C-1 Page 8 of 8 SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc CHANNEL A CORE EXIT THERMOCOUPLE MAP DATA (PAGE 731) QUADRANT 1 QUADRANT 2 QUADRANT 3 QUADRANT 4 1 W6 583°F 1 T18 591°F 1 G9 582°F 1 T2 593°F 2 W13 590°F 2 L13 573°F 2 G13 576°F 2 R4 587°F 3 W18 558°F 3 L16 584°F 3 E6 589°F 3 R6 612°F 4 T13 582°F 4 G16 588°F 4 E9 588°F 4 L2 575°F 5 T16 589°F 5 G18 589°F 5 C4 560°F 5 L9 573°F 6 G20 84°F 6 C9 591°F 6 G2 606°F 7 E20 553°F 7 C16 590°F 7 E4 589°F 8 A8 572°F 9 A14 540°F
Appendix C                       JPM CUE SHEET                         Form ES-C-1 INITIAL CONDITIONS:  Given the following conditions:
* Unit 2 is in MODE 1 at 100% power.
* The monthly surveillance for the Core Exit Thermocouple and Heated Junction Thermocouple System is due.
INITIATING CUE:      The Shift Manager directs you to PERFORM the following:
* SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel Checks.
* Core Exit Thermocouple and Heated Junction Thermocouple data is attached.
Page 7 of 8       SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc


CHANNEL B CORE EXIT THERMOCOUPLE MAP (PAGE 731) QUADRANT 1 QUADRANT 2 QUADRANT 3 QUADRANT 4 1 Y8 541°F 1 T20 548°F 1 E13 583°F 1 T4 593°F 2 Y14 563°F 2 R16 585°F 2 E16 611°F 2 R2 585°F 3 W4 - 3 R18 584°F 3 C6 - 3 L4 600°F 4 W9 610°F 4 R20 601°F 4 C13 612°F 4 L6 592°F 5 W16 598°F 5 L18 594°F 5 C18 - 5 G4 589°F 6 T6 585°F 6 L20 576°F 6 G6 608°F 7 T9 614°F 7 E18 588°F 7 E2 540°F 8 R9 585°F 9 R13 588°F  
Appendix C                        JPM CUE SHEET                        Form ES-C-1 CHANNEL A CORE EXIT THERMOCOUPLE MAP DATA (PAGE 731)
QUADRANT 1            QUADRANT 2          QUADRANT 3            QUADRANT 4 1      W6  583°F    1    T18    591°F  1      G9    582°F    1    T2    593°F 2      W13  590°F    2    L13    573°F  2    G13    576°F    2    R4    587°F 3      W18  558°F    3    L16    584°F  3      E6    589°F    3    R6    612°F 4      T13  582°F    4    G16    588°F  4      E9    588°F    4    L2    575°F 5      T16  589°F    5    G18    589°F  5      C4    560°F    5    L9    573°F 6    G20      84°F  6      C9    591°F    6    G2    606°F 7    E20    553°F  7    C16    590°F    7    E4    589°F 8      A8    572°F 9    A14    540°F CHANNEL B CORE EXIT THERMOCOUPLE MAP (PAGE 731)
QUADRANT 1           QUADRANT 2           QUADRANT 3           QUADRANT 4 1       Y8   541°F   1     T20   548°F   1     E13   583°F   1     T4   593°F 2       Y14 563°F   2   R16     585°F   2     E16   611°F   2     R2   585°F 3       W4     -     3   R18     584°F   3     C6       -     3     L4   600°F 4       W9   610°F   4   R20     601°F   4     C13   612°F   4     L6   592°F 5     W16   598°F   5     L18   594°F   5     C18       -     5     G4   589°F 6       T6   585°F   6     L20   576°F                         6     G6   608°F 7       T9   614°F   7     E18   588°F                         7     E2   540°F 8       R9   585°F 9       R13 588°F Page 8 of 8          SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc


Appendix C JPM WORKSHEET Form ES-C-1 Page 1 of 6 SONGS Oct 2009 NRC RO Admin JPM A.3 Rev 0.doc        Facility: SONGS JPM # NRC RO A.3   Task #113888 K/A #2.3.12 3.2/3.7 Title: Determine Dose for Maintenance Activities Examinee (Print):
Appendix C                                     JPM WORKSHEET                                 Form ES-C-1 Facility: SONGS JPM # NRC RO A.3                     Task #113888     K/A #2.3.12           3.2/3.7
 
==Title:==
Determine Dose for Maintenance Activities Examinee (Print):
Testing Method:
Testing Method:
Simulated Performance:   Classroom:   X Actual Performance: X Simulator:
Simulated Performance:                                       Classroom:     X Actual Performance:             X                           Simulator:
Plant:   READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue. When you complete the task successfully, the objective for this JPM will be satisfied.
Plant:
Initial Conditions: A high dose maintenance acti vity is scheduled in the Unit 3 Penetration Building. The general dose rate in the area is 80 mrem/hour but can be reduced to 35 mrem/hour if lead shielding is installed. It will take Operators A & B 45 minut es to install the shielding if desired. Independent of the shielding, it will take Operator A two and a half (2.5) hours or Operators A & B an hour and one half (1.5) hours to perform the maintenance.
READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.
Initiating Cue: The Work Pr ocess Supervisor directs you to SELECT the condition with the lowest total dose to perform the maintenance. ANNOTATE the total dose for each option. 1. Operator A without shielding total dose _________.
When you complete the task successfully, the objective for this JPM will be satisfied.
Initial Conditions:     A high dose maintenance activity is scheduled in the Unit 3 Penetration Building.
* The general dose rate in the area is 80 mrem/hour but can be reduced to 35 mrem/hour if lead shielding is installed.
* It will take Operators A & B 45 minutes to install the shielding if desired.
* Independent of the shielding, it will take Operator A two and a half (2.5) hours or Operators A & B an hour and one half (1.5) hours to perform the maintenance.
Initiating Cue:         The Work Process Supervisor directs you to SELECT the condition with the lowest total dose to perform the maintenance.
* ANNOTATE the total dose for each option.
: 1. Operator A without shielding total dose _________.
: 2. Operators A & B without shielding total dose ________.
: 2. Operators A & B without shielding total dose ________.
: 3. Operator A with shielding total dose ________.
: 3. Operator A with shielding total dose ________.
: 4. Operators A & B with shielding total dose ________. CIRCLE the lowest dose condition.  
: 4. Operators A & B with shielding total dose ________.
* CIRCLE the lowest dose condition.
Task Standard:          Choose the methodology that result in keeping total dose As Low As Reasonably Achievable (ALARA).
Required Materials: Calculator Validation Time:          8 minutes      Time Critical: N/A  Completion Time:    ________ minutes Page 1 of 6                SONGS Oct 2009 NRC RO Admin JPM A.3 Rev 0.doc


Task Standard: Choose the methodology that result in keeping total dose As Low As Reasonably Achievable (ALARA).
Appendix C                            JPM WORKSHEET                        Form ES-C-1 Comments:
Required Materials: Calculator
Result:  SAT        UNSAT Examiner (Print / Sign):                                              Date:
Page 2 of 6              SONGS Oct 2009 NRC RO Admin JPM A.3 Rev 0.doc


Validation Time: 8 minutes Time Critical: N/A Completion Time: ________ minutes
Appendix C                      JPM WORKSHEET                  Form ES-C-1 CLASSROOM SETUP EXAMINER:
PROVIDE the examinee with a Calculator.
Page 3 of 6      SONGS Oct 2009 NRC RO Admin JPM A.3 Rev 0.doc


Appendix C JPM WORKSHEET Form ES-C-1 Page 2 of 6 SONGS Oct 2009 NRC RO Admin JPM A.3 Rev 0.doc Comments:  Result: SAT  UNSAT  Examiner (Print / Sign):  Date:
Appendix C                           JPM STEPS                              Form ES-C-1
Appendix C JPM WORKSHEET Form ES-C-1 Page 3 of 6 SONGS Oct 2009 NRC RO Admin JPM A.3 Rev 0.doc CLASSROOM SETUP EXAMINER: PROVIDE the examinee with a Calculator.
  - Check Mark Denotes Critical Step                     START TIME:
Appendix C JPM STEPS Form ES-C-1 Page 4 of 6 SONGS Oct 2009 NRC RO Admin JPM A.3 Rev 0.doc          - Check Mark Denotes Critical Step START TIME:
Perform Step: 1   Determine total dose to Operator A without shielding.
Perform Step: 1 Determine total dose to Operator A without shielding.
Standard:           DETERMINE total dose to Operator A without shielding as follows:
Standard: DETERMINE total dose to Operator A without shielding as follows: 80 mrem/hr x 2.5 hours =
* 80 mrem/hr x 2.5 hours = 200 mrem total dose.
200 mrem total dose.
Comment:                                                           SAT      UNSAT Perform Step: 2   Determine total dose to Operators A & B without shielding.
Comment: SAT      UNSAT     Perform Step: 2 Determine total dose to Operators A & B without shielding.
Standard:         DETERMINE total dose to Operators A & B without shielding as follows:
Standard: DETERMINE total dose to Operators A & B without shielding as follows:
80 mrem/hr x 1.5 hours/operator x 2 operators = 240 mrem total dose.
80 mrem/hr x 1.5 hours/oper ator x 2 operators =
Comment:                                                           SAT      UNSAT Perform Step: 3     Determine total dose to install shielding.
240 mrem total dose.
Standard:           DETERMINE total dose to install shielding as follows:
Comment: SAT      UNSAT     Perform Step: 3 Determine total dose to install shielding.
* 80 mrem/hr x .75 hours/operator x 2 operators = 120 mrem to install.
Standard:
Comment:                                                           SAT      UNSAT Perform Step: 4   Determine total dose to Operator A with shielding.
DETERMINE total dose to install shielding as follows: 80 mrem/hr x .75 hours/
Standard:           DETERMINE total dose to Operator A with shielding as follows:
operator x 2 operators =
* 35 mrem/hr x 2.5 hours + 120 mrem = 207.5 mrem total dose.
120 mrem to install. Comment: SAT      UNSAT     Perform Step: 4 Determine total dose to Operator A with shielding.
Comment:                                                           SAT      UNSAT Perform Step: 5   Determine total dose to Operators A & B with shielding.
Standard: DETERMINE total dose to Operator A with shielding as follows: 35 mrem/hr x 2.5 hours + 120 mrem =
Standard:           DETERMINE total dose to Operators A & B with shielding as follows:
207.5 mrem total dose.
* 35 mrem/hr x 1.5 hours/operator x 2 operators + 120 mrem =
Comment: SAT      UNSAT     Perform Step: 5 Determine total dose to Operators A & B with shielding.
Standard: DETERMINE total dose to Operators A & B with shielding as follows: 35 mrem/hr x 1.5 hours/operator x 2 operators + 120 mrem =
225 mrem total dose.
225 mrem total dose.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 5 of 6 SONGS Oct 2009 NRC RO Admin JPM A.3 Rev 0.doc Perform Step: 6 Select the appropriate individual.
Comment:                                                           SAT      UNSAT Page 4 of 6       SONGS Oct 2009 NRC RO Admin JPM A.3 Rev 0.doc
Standard:
DETERMINE total dose to Operator A without shielding at a total dose of 200 mrem is the most desirable select ion and CIRCLE #1 on the Cue sheet. Terminating Cue: This JPM is complete.
Comment: SAT      UNSAT      STOP TIME:
Appendix C JPM CUE SHEET Form ES-C-1 Page 6 of 6 SONGS Oct 2009 NRC RO Admin JPM A.3 Rev 0.doc INITIAL CONDITIONS: A high dose maintenance activity is scheduled in the Unit 3 Penetration Building. The general dose rate in the area is 80 mrem/hour but can be reduced to 35 mrem/hour if lead shielding is installed. It will take Operators A & B 45 minutes to install the shielding if desired. Independent of the shielding, it will take Operator A two and a half (2.5) hours or Operators A & B an hour and one half (1.5) hours to pe rform the maintenance.


INITIATING CUE: The Work Process Supervisor directs you to SELECT the condition with the lowest total dose to perform the maintenance. ANNOTATE the total dose for each option. 1. Operator A without shielding total dose _____ mrem.
Appendix C                          JPM STEPS                          Form ES-C-1 Perform Step: 6  Select the appropriate individual.
Standard:        DETERMINE total dose to Operator A without shielding at a total dose of 200 mrem is the most desirable selection and CIRCLE #1 on the Cue sheet.
Terminating Cue: This JPM is complete.
Comment:                                                      SAT    UNSAT STOP TIME:
Page 5 of 6      SONGS Oct 2009 NRC RO Admin JPM A.3 Rev 0.doc
 
Appendix C                          JPM CUE SHEET                        Form ES-C-1 INITIAL CONDITIONS: A high dose maintenance activity is scheduled in the Unit 3 Penetration Building.
* The general dose rate in the area is 80 mrem/hour but can be reduced to 35 mrem/hour if lead shielding is installed.
* It will take Operators A & B 45 minutes to install the shielding if desired.
* Independent of the shielding, it will take Operator A two and a half (2.5) hours or Operators A & B an hour and one half (1.5) hours to perform the maintenance.
INITIATING CUE:     The Work Process Supervisor directs you to SELECT the condition with the lowest total dose to perform the maintenance.
* ANNOTATE the total dose for each option.
: 1. Operator A without shielding total dose _____ mrem.
: 2. Operators A & B without shielding total dose _____ mrem.
: 2. Operators A & B without shielding total dose _____ mrem.
: 3. Operator A with shielding total dose _____ mrem.
: 3. Operator A with shielding total dose _____ mrem.
: 4. Operators A & B with shielding total dose _____ mrem. CIRCLE the lowest dose condition.  
: 4. Operators A & B with shielding total dose _____ mrem.
 
* CIRCLE the lowest dose condition.
ES-301 Administrative T opics Outline Form ES-301-1 NUREG-1021, Revision 9.1 1 of 2 SONGS Oct 2009 SRO ES-301-1 Rev 1 Facility: SONGS 2 & 3 Date of Examination: 10/19/09 Examination Level SRO  Operating Test Number: NRC Administrative Topic (see Note) Type Code* Describe Activity to be Performed Conduct of Operations M, R 2.1.23  Ability to perform specific system and integrated plant procedures during all modes of plant operation (4.4).
Page 6 of 6      SONGS Oct 2009 NRC RO Admin JPM A.3 Rev 0.doc
JPM:    Determine Azimuthal Power Tilt (J250A).
Conduct of Operations M, R 2.1.25    Ability to interpret reference materials such as graphs, curves, tables, etc. (4.2).
JPM:    Determine Time to Boil (J213A).
Equipment Control N, R 2.2.12 Knowledge of Surveillance Procedures (4.1).
JPM: Review Core Exit Thermocouple Channel Check surveillance and verify Technical Specification Compliance. (New)
Radiation Control N, R 2.3.12 Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc. (3.7).
JPM: Determine Containment Access Requirements (New).
Emergency Plan M, R 2.4.44 Knowledge of emergency plan protective action recommendations
. (4.4). JPM: Determine Protective Actions (J126A). NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required. *Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs;  for 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)  (P)revious 2 exams ( 1; randomly selected)
 
Administrative Topics Outline Task Summary NUREG-1021, Revision 9.1 2 of 2 SONGS Oct 2009 SRO ES-301-1 Rev 1 SRO A.1.a The candidate will perform an Azimuthal Power Tilt calculation per SO23-3-3.6, COLSS Out of Service Surveillance, attachment 3, Azimuthal Power Tilt Determination
. The critical steps include correctly transposing data, accurately performing all calcul ations, correctly identifying out of tolerance conditions and identifying required actions. Additionally, a determination of actions for out-of-tolerance Azimuthal T ilt is required.
This is a modified bank JPM.
 
SRO A.1.b The candidate will calculate Time-to-Boil per SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin. The critical steps include correctly interpreting curves within tolerances and performing the final calculation within given tolerances. This is a
 
modified bank JPM.
 
SRO A.2 The candidate will be provided with a set of Core Exit Thermocouple data and will determine if the requir ed OPERABILITY is met using SO23-3-3.35, PAMI / Safe Shutdown M onthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly
 
Channel Checks. The critical steps include identifying any out-of-service thermocouples, correctly determining OPERABILITY, and recording entry into any required Technical Specif ication LCOs for the Core Exit Thermocouple System. This is a new JPM.  


SRO A.3 The candidate will determine the requirements for Containment access per SO23-3-2.34, Containment Access Control, Inspections and Airlocks Operation. The critical steps include properly iden tifying all requirements on Attachment 1, Containment Access Requirements. This is a new JPM.  
ES-301                              Administrative Topics Outline                      Form ES-301-1 Facility:      SONGS 2 & 3                                Date of Examination:          10/19/09 Examination Level                    SRO                 Operating Test Number:        NRC Administrative Topic          Type Code*                Describe Activity to be Performed (see Note) 2.1.23 Ability to perform specific system and integrated plant procedures during all modes Conduct of Operations              M, R                of plant operation (4.4).
JPM:    Determine Azimuthal Power Tilt (J250A).
2.1.25    Ability to interpret reference materials such as graphs, curves, tables, etc. (4.2).
Conduct of Operations              M, R JPM:    Determine Time to Boil (J213A).
2.2.12 Knowledge of Surveillance Procedures (4.1).
Equipment Control                   N, R      JPM:    Review Core Exit Thermocouple Channel Check surveillance and verify Technical Specification Compliance. (New) 2.3.12 Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling Radiation Control                                      responsibilities, access to locked high-N, R                radiation areas, aligning filters, etc. (3.7).
JPM:    Determine Containment Access Requirements (New).
2.4.44 Knowledge of emergency plan protective action recommendations. (4.4).
Emergency Plan                      M, R JPM:    Determine Protective Actions (J126A).
NOTE:        All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
*Type Codes & Criteria:          (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs;  for 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
NUREG-1021, Revision 9.1                        1 of 2        SONGS Oct 2009 SRO ES-301-1 Rev 1


SRO A.4 The candidate will review given plant conditions and offsite dose information and determine required protective actions per  
Administrative Topics Outline Task Summary SRO A.1.a  The candidate will perform an Azimuthal Power Tilt calculation per SO23-3-3.6, COLSS Out of Service Surveillance, attachment 3, Azimuthal Power Tilt Determination. The critical steps include correctly transposing data, accurately performing all calculations, correctly identifying out of tolerance conditions and identifying required actions. Additionally, a determination of actions for out-of-tolerance Azimuthal Tilt is required.
This is a modified bank JPM.
SRO A.1.b  The candidate will calculate Time-to-Boil per SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin.
The critical steps include correctly interpreting curves within tolerances and performing the final calculation within given tolerances. This is a modified bank JPM.
SRO A.2    The candidate will be provided with a set of Core Exit Thermocouple data and will determine if the required OPERABILITY is met using SO23-3-3.35, PAMI / Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel Checks. The critical steps include identifying any out-of-service thermocouples, correctly determining OPERABILITY, and recording entry into any required Technical Specification LCOs for the Core Exit Thermocouple System. This is a new JPM.
SRO A.3    The candidate will determine the requirements for Containment access per SO23-3-2.34, Containment Access Control, Inspections and Airlocks Operation. The critical steps include properly identifying all requirements on Attachment 1, Containment Access Requirements. This is a new JPM.
SRO A.4   The candidate will review given plant conditions and offsite dose information and determine required protective actions per SO123-VIII-10.3, Protective Action Recommendations. The critical steps include determining the affected areas and the recommended protective actions. This is a modified bank JPM.
NUREG-1021, Revision 9.1              2 of 2      SONGS Oct 2009 SRO ES-301-1 Rev 1


SO123-VIII-10.3, Protective Action Recommendations. The critical steps include determining the affected areas and the recommended protective actions. This is a modified bank JPM.
Appendix C                                    JPM WORKSHEET                                  Form ES-C-1 Facility: SONGS JPM # NRC SRO A.1.a                Task #187652      K/A #2.1.23          4.3/4.4


Appendix C JPM WORKSHEET Form ES-C-1 Page 1 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc        Facility: SONGS JPM # NRC SRO A.1.a  Task #187652 K/A #2.1.23 4.3/4.4 Title: Determine Azimuthal Power Tilt Examinee (Print):
==Title:==
Determine Azimuthal Power Tilt Examinee (Print):
Testing Method:
Testing Method:
Simulated Performance:   Classroom: X Actual Performance: X Simulator:   Plant:
Simulated Performance:                                       Classroom:     X Actual Performance:             X                           Simulator:
READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue. When you complete the task successfully, the objective for this JPM will be satisfied.
Plant:
Initial Conditions: Given the following conditions: Unit 2 is in Mode 1 at 99.98% power. Part-Length Control Element Assemblies (PLCEAs) are at 145 inches. Core Protection Calculator Chan nel B and Core Operating Limits Supervisory System (COL SS) are INOPERABLE. COLSS out of service surveillances are in progress.
READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.
Initiating Cue: The Shift Manager directs you to PERFORM the following: CALCULATE Azimuthal Power Tilt per SO23-3-3.6, COLSS Out of Service Surveillance, Attachm ent 3, Azimuthal Power Tilt Determination starting at Step 3.2. VERIFY Instrument data has been recorded at Steps 3.1 and 3.4. DOCUMENT any Technical Specification REQUIRED ACTION(s) in the COMMENTS Section of Attachment 3. Another SRO will PERFORM Independent Verification when the surveillance is complete.
When you complete the task successfully, the objective for this JPM will be satisfied.
Task Standard: Locate and correctly perform Critical Steps of SO23-3-3.6, Attachment 3 and Technical Specification LCO 3.2.3.
Initial Conditions:     Given the following conditions:
Required Materials: SO23-3-3.6, COLSS Out of Serv ice Surveillance, Attachment 3, Azimuthal Power Tilt Determination, Rev. 12-2. Technical Specification LCO 3.2.3, Azimuthal Power Tilt (Tq), Amendment #127.
* Unit 2 is in Mode 1 at 99.98% power.
Validation Time: 22 minutes Time Critical: N/A Completion Time: ________ minutes  
* Part-Length Control Element Assemblies (PLCEAs) are at 145 inches.
* Core Protection Calculator Channel B and Core Operating Limits Supervisory System (COLSS) are INOPERABLE.
* COLSS out of service surveillances are in progress.
Initiating Cue:         The Shift Manager directs you to PERFORM the following:
* CALCULATE Azimuthal Power Tilt per SO23-3-3.6, COLSS Out of Service Surveillance, Attachment 3, Azimuthal Power Tilt Determination starting at Step 3.2.
* VERIFY Instrument data has been recorded at Steps 3.1 and 3.4.
* DOCUMENT any Technical Specification REQUIRED ACTION(s) in the COMMENTS Section of Attachment 3.
* Another SRO will PERFORM Independent Verification when the surveillance is complete.
Task Standard:           Locate and correctly perform Critical Steps of SO23-3-3.6, Attachment 3 and Technical Specification LCO 3.2.3.
Required Materials: SO23-3-3.6, COLSS Out of Service Surveillance, Attachment 3, Azimuthal Power Tilt Determination, Rev. 12-2.
Technical Specification LCO 3.2.3, Azimuthal Power Tilt (Tq), Amendment #127.
Validation Time:         22 minutes     Time Critical: N/A   Completion Time:   ________ minutes Page 1 of 7                SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc


Appendix C JPM WORKSHEET Form ES-C-1 Page 2 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc Comments:
Appendix C                           JPM WORKSHEET                       Form ES-C-1 Comments:
Result: SAT UNSAT   Examiner (Print / Sign): Date:
Result:   SAT       UNSAT Examiner (Print / Sign):                                             Date:
Appendix C JPM WORKSHEET Form ES-C-1 Page 3 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc CLASSROOM SETUP EXAMINER: PROVIDE the examinee with a copy of:  SO23-3-3.6, COLSS Out of Service Surveillance, Attachment 3, Azimuthal Power Tilt Determination as follows:  ENTER data prior to Sect ion 1.0, Prerequisites:  Unit 2; MODE 1; RX POWER is 99.98%; DATE is Today; Time is Now  INITIAL Steps 1.1 and 1.2. ENTER the following data at Step 3.1 and INITIAL:  1.0299 for Channel A, C and D. INOP for Channel B. ENTER the following data at Step 3.4.1 and INITIAL:  90.51 for Channel A, 92.115 for Channel C and 91.565 for Channel D. INOP for Channel B. ENTER the following data at Step 3.4.2 and INITIAL:  110.89 for Channel A, 112.59 for Channel C and 111.89 for Channel D. INOP for Channel B. ENTER the following data at Step 3.4.3 and INITIAL:  90.10 for Channel A, 91.95 for Channel C and 91.355 for Channel D. INOP for Channel B.
Page 2 of 7           SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc
Appendix C JPM STEPS Form ES-C-1 Page 4 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc         - Check Mark Denotes Critical Step START TIME:
Perform Step: 1 Record the CPC AZ Tilt Allowance from each Operable CPC channel (CPC PID 063). (Mark INOP or TRIPPED as applicable for any channel not available.)
Standard:
VERIFY data is recorded at Step 3.1.
Comment: SAT      UNSAT      Perform Step: 2 Subtract 1 from each Azimuthal Tilt Allowance in Step 3.1 and record results. (Mark INOP or TRIPPED as applicable for any channel not


available.)
Appendix C                          JPM WORKSHEET                        Form ES-C-1 CLASSROOM SETUP EXAMINER:
Standard:
PROVIDE the examinee with a copy of:
RECORD 0.0299 for Channels A, C, and D. MARK Channel B as INOP.
* SO23-3-3.6, COLSS Out of Service Surveillance, Attachment 3, Azimuthal Power Tilt Determination as follows:
Comment: SAT      UNSAT      Perform Step: 3 Determine the applicable equation to be used based on the number of Operable CPC channels. Circl e the equation to be used.
* ENTER data prior to Section 1.0, Prerequisites:
Standard:
* Unit 2; MODE 1; RX POWER is 99.98%; DATE is Today; Time is Now
CIRCLE equation at Step 3.3.3: CPC A, C, & D Operable (perform only if CPC channel B is Inoperable):
* INITIAL Steps 1.1 and 1.2.
Comment: SAT      UNSAT      Perform Step: 4 Record Excore Neutron Flux Detect or values from each Operable CPC channel. (Mark INOP or TRIPPED as applicable for any channel not
* ENTER the following data at Step 3.1 and INITIAL:
* 1.0299 for Channel A, C and D.
* INOP for Channel B.
* ENTER the following data at Step 3.4.1 and INITIAL:
* 90.51 for Channel A, 92.115 for Channel C and 91.565 for Channel D.
* INOP for Channel B.
* ENTER the following data at Step 3.4.2 and INITIAL:
* 110.89 for Channel A, 112.59 for Channel C and 111.89 for Channel D.
* INOP for Channel B.
* ENTER the following data at Step 3.4.3 and INITIAL:
* 90.10 for Channel A, 91.95 for Channel C and 91.355 for Channel D.
* INOP for Channel B.
Page 3 of 7          SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc


available.) Upper detector (PID 010:)  Middle detector (PID 011:) Lower detector (PID 012:)
Appendix C                            JPM STEPS                            Form ES-C-1
Standard:
  - Check Mark Denotes Critical Step                    START TIME:
VERIFY data is reco rded at Step 3.4.1.
Perform Step: 1    Record the CPC AZ Tilt Allowance from each Operable CPC channel (CPC PID 063). (Mark INOP or TRIPPED as applicable for any channel not available.)
Comment: SAT     UNSAT Appendix C JPM STEPS Form ES-C-1 Page 5 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc Perform Step: 5 Determine the CPC Azimuthal Power Tilt for each level of detectors using the following equati on: (Record the select ed equation from Step 3.3) Standard:
Standard:         VERIFY data is recorded at Step 3.1.
RECORD Step 3.3.3 Channel A, C and D detectors where appropriate.
Comment:                                                         SAT       UNSAT Perform Step: 2  Subtract 1 from each Azimuthal Tilt Allowance in Step 3.1 and record results. (Mark INOP or TRIPPED as applicable for any channel not available.)
Comment: SAT     UNSAT     Perform Step: 6 Determine the CPC Azimuthal Power Tilt for each level of detectors using the follo wing equation:  Upper Detector Standard:
Standard:         RECORD 0.0299 for Channels A, C, and D. MARK Channel B as INOP.
INSERT Upper Detector values in to equation and SOLVE with a result of 0.0148.
Comment:                                                         SAT       UNSAT Perform Step: 3    Determine the applicable equation to be used based on the number of Operable CPC channels. Circle the equation to be used.
Comment: SAT      UNSAT      Perform Step: 7 Determine the CPC Azimuthal Power Tilt for each level of detectors using the follo wing equation:  Middle Detector Standard: INSERT Middle Detector values into equation and SOLVE with a result of 0.0124.
Standard:           CIRCLE equation at Step 3.3.3:
Comment: SAT      UNSAT      Perform Step: 8 Determine the CPC Azimuthal Power Tilt for each level of detectors using the follo wing equation:  Lower Detector Standard: INSERT Lower Detector values into equation and SOLVE with a result of 0.0173.
* CPC A, C, & D Operable (perform only if CPC channel B is Inoperable):
Comment: SAT     UNSAT     Perform Step: 9 Record the average (T CPC) of the tilts calculated in Step 3.5. If one of the values of Steps 3.5.1 through 3.5.3 is significantly different than the other two it may be omitted from the average with permission from the Shift Manager and a Reactor Engineer. (Note in the Comments Section any tilt value not used, and use "0" in the applicable space below.)
Comment:                                                         SAT       UNSAT Perform Step: 4    Record Excore Neutron Flux Detector values from each Operable CPC channel. (Mark INOP or TRIPPED as applicable for any channel not available.)
Standard:
* Upper detector (PID 010:)
CALCULATE and RECORD average T CPC : ADD 0.0148 + 0.
* Middle detector (PID 011:)
0124 + 0.0173 = 0.0148.
* Lower detector (PID 012:)
Comment: SAT     UNSAT Appendix C JPM STEPS Form ES-C-1 Page 6 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc Perform Step: 10 Determine Azimuthal Power Tilt (Tq):  Tq = 2.5 X _____Tcpc (from Step 3.6)
Standard:          VERIFY data is recorded at Step 3.4.1.
Standard: Determine Azimuthal Power Tilt (Tq):  MULTIPLY 0.0148 x 2.5 =
Comment:                                                         SAT       UNSAT Page 4 of 7       SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc
0.037 +/- 0.001
= Tq Comment: SAT      UNSAT      Perform Step: 11 If Azimuthal Power Tilt (Tq) from St ep 3.8 is greater than 0.03, then INITIATE an AR, record the AR num ber in the Comments Section, then contact Reactor Engineering to evaluate core design and to establish


operating restrictions and surveillance requirements within 72 hours.
Appendix C                            JPM STEPS                                Form ES-C-1 Perform Step: 5  Determine the CPC Azimuthal Power Tilt for each level of detectors using the following equation: (Record the selected equation from Step 3.3)
Standard: DETERMINE that Azimuthal Power Tilt (Tq) from Step 3.8 is greater than 0.03 and RECORD these actions in the Comments Section: INITIATE an AR and RECORD in the Comments Section. CONTACT Reactor Engineering.
Standard:        RECORD Step 3.3.3 Channel A, C and D detectors where appropriate.
Comment: SAT     UNSAT     Perform Step: 12 The calculated Azimuthal Power Tilt (Tq)  (Step 3.8) is less than or equal to the Azimuthal Tilt Allowa nce used in the Core Protection Calculators (Step 3.2). Yes / No (circle one)
Comment:                                                            SAT        UNSAT Perform Step: 6  Determine the CPC Azimuthal Power Tilt for each level of detectors using the following equation:
Standard:
* Upper Detector Standard:         INSERT Upper Detector values into equation and SOLVE with a result of 0.0148.
CIRCLE No.
Comment:                                                           SAT       UNSAT Perform Step: 7  Determine the CPC Azimuthal Power Tilt for each level of detectors using the following equation:
Comment: SAT     UNSAT     Perform Step: 13 If NO is circled, then refer to Tech. Spec. LCO 3.2.3, INITIATE required actions and LCOAR/EDMR as applicable, and record actions taken in the Comments Section.
* Middle Detector Standard:        INSERT Middle Detector values into equation and SOLVE with a result of 0.0124.
Standard:
Comment:                                                            SAT        UNSAT Perform Step: 8   Determine the CPC Azimuthal Power Tilt for each level of detectors using the following equation:
RECORD these actions in the COMME NTS Section from TS LCO 3.2.3:  LCO 3.2.3.B.1 - ADJUST the Tq allowance in the CPCs to greater than or equal to the measured Tq within two hours  LCO 3.2.3.B.2 - EVALUATE core design and safety analysis and determine that the core is acceptable for continued operation
* Lower Detector Standard:         INSERT Lower Detector values into equation and SOLVE with a result of 0.0173.
Comment:                                                           SAT       UNSAT Perform Step: 9  Record the average (TCPC) of the tilts calculated in Step 3.5. If one of the values of Steps 3.5.1 through 3.5.3 is significantly different than the other two it may be omitted from the average with permission from the Shift Manager and a Reactor Engineer. (Note in the Comments Section any tilt value not used, and use 0 in the applicable space below.)
Standard:        CALCULATE and RECORD average TCPC :
* ADD 0.0148 + 0.0124 + 0.0173 = 0.0148.
Comment:                                                            SAT        UNSAT Page 5 of 7      SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc


within 72 hours. LCO 3.2.3.B.3 - ESTABLISH appr opriate operating restrictions and SRs within 72 hours. Terminating Cue: This JPM is complete.
Appendix C                              JPM STEPS                              Form ES-C-1 Perform Step: 10  Determine Azimuthal Power Tilt (Tq):
Comment: SAT     UNSAT       STOP TIME:
* Tq = 2.5 X _____Tcpc (from Step 3.6)
Standard:          Determine Azimuthal Power Tilt (Tq):
* MULTIPLY 0.0148 x 2.5 = 0.037 +/- 0.001 = Tq Comment:                                                            SAT      UNSAT Perform Step: 11  If Azimuthal Power Tilt (Tq) from Step 3.8 is greater than 0.03, then INITIATE an AR, record the AR number in the Comments Section, then contact Reactor Engineering to evaluate core design and to establish operating restrictions and surveillance requirements within 72 hours.
Standard:          DETERMINE that Azimuthal Power Tilt (Tq) from Step 3.8 is greater than 0.03 and RECORD these actions in the Comments Section:
* INITIATE an AR and RECORD in the Comments Section.
* CONTACT Reactor Engineering.
Comment:                                                            SAT      UNSAT Perform Step: 12  The calculated Azimuthal Power Tilt (Tq) (Step 3.8) is less than or equal to the Azimuthal Tilt Allowance used in the Core Protection Calculators (Step 3.2). Yes / No (circle one)
Standard:          CIRCLE No.
Comment:                                                            SAT      UNSAT Perform Step: 13  If NO is circled, then refer to Tech. Spec. LCO 3.2.3, INITIATE required actions and LCOAR/EDMR as applicable, and record actions taken in the Comments Section.
Standard:          RECORD these actions in the COMMENTS Section from TS LCO 3.2.3:
* LCO 3.2.3.B.1 - ADJUST the Tq allowance in the CPCs to greater than or equal to the measured Tq within two hours
* LCO 3.2.3.B.2 - EVALUATE core design and safety analysis and determine that the core is acceptable for continued operation within 72 hours.
* LCO 3.2.3.B.3 - ESTABLISH appropriate operating restrictions and SRs within 72 hours.
Terminating Cue:   This JPM is complete.
Comment:                                                           SAT       UNSAT STOP TIME:
Page 6 of 7      SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc


Appendix C JPM CUE SHEET Form ES-C-1 Page 7 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc INITIAL CONDITIONS: Given the following conditions: Unit 2 is in Mode 1 at 99.98% power. Part-Length Control Element Assemblies (PLCEAs) are at 145 inches. Core Protection Calculator Channel B and Core Operating Limits Supervisory System (COLSS) are INOPERABLE. COLSS out-of service-surveillances are in progress.  
Appendix C                       JPM CUE SHEET                         Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:
* Unit 2 is in Mode 1 at 99.98% power.
* Part-Length Control Element Assemblies (PLCEAs) are at 145 inches.
* Core Protection Calculator Channel B and Core Operating Limits Supervisory System (COLSS) are INOPERABLE.
* COLSS out-of service-surveillances are in progress.
INITIATING CUE:      The Shift Manager directs you to PERFORM the following:
* CALCULATE Azimuthal Power Tilt per SO23-3-3.6, COLSS Out of Service Surveillance, Attachment 3, Azimuthal Power Tilt Determination starting at Step 3.2.
* VERIFY Instrument data has been recorded at Steps 3.1 and 3.4.
* DOCUMENT any Technical Specification REQUIRED ACTION(s) in the COMMENTS Section of Attachment 3.
* Another SRO will PERFORM Independent Verification when the surveillance is complete.
Page 7 of 7      SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc


INITIATING CUE: The Shift Manager directs you to PERFORM the following:  CALCULATE Azimuthal Powe r Tilt per SO23-3-3.6, COLSS Out of Service Surveillance, Attachment 3, Azimuthal Power Tilt Determina tion starting at Step 3.2. VERIFY Instrument data has been recorded at Steps 3.1 and 3.4. DOCUMENT any Technical Specification REQUIRED ACTION(s) in the COMMENTS Sect ion of Attachment 3. Another SRO will PERFORM Independent Verification when the surveillance is complete.
Appendix C                                    JPM WORKSHEET                                  Form ES-C-1 Facility: SONGS JPM # NRC SRO A.1.b                Task #188898      K/A #2.1.25          3.9/4.2


Appendix C JPM WORKSHEET Form ES-C-1 Page 1 of 6 SONGS Oct 2009 NRC SRO Admin JPM A.1.b Rev 0.doc        Facility: SONGS JPM # NRC SRO A.1.b  Task #188898 K/A #2.1.25 3.9/4.2 Title: Determine Time to Boil Examinee (Print):
==Title:==
Determine Time to Boil Examinee (Print):
Testing Method:
Testing Method:
Simulated Performance:   Classroom:   X Actual Performance: X Simulator:
Simulated Performance:                                       Classroom:     X Actual Performance:             X                           Simulator:
Plant:   READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue. When you complete the task successfully, the objective for this JPM will be satisfied.
Plant:
Initial Conditions: Given the following conditions: Unit 3 is in MODE 6 after a 420 day run. The core reload is complete with 101 new fuel assemblies. Reactor Coolant System level is at Midloop (27 inches) to remove the Nozzle Dams in place on St eam Generators E-088 and E-089. Shutdown Cooling Heat Exchanger inlet temperature is 115.5 °F. The Reactor has been shut down for 22 days. The Pressurizer Manway is removed and is being used as the RCS vent. Initiating Cue: The Shift Manager directs you to PERFORM the following: SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin. Outage specific Time to Boil Data Transmittal has NOT been provided by Reactor Engineering.
READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.
Task Standard: Locate and correctly perform Critical Steps of SO23-5-1.8.1, Attachment 9.  
When you complete the task successfully, the objective for this JPM will be satisfied.
Initial Conditions:     Given the following conditions:
* Unit 3 is in MODE 6 after a 420 day run.
* The core reload is complete with 101 new fuel assemblies.
* Reactor Coolant System level is at Midloop (27 inches) to remove the Nozzle Dams in place on Steam Generators E-088 and E-089.
* Shutdown Cooling Heat Exchanger inlet temperature is 115.5 °F.
* The Reactor has been shut down for 22 days.
* The Pressurizer Manway is removed and is being used as the RCS vent.
Initiating Cue:         The Shift Manager directs you to PERFORM the following:
* SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin.
* Outage specific Time to Boil Data Transmittal has NOT been provided by Reactor Engineering.
Task Standard:           Locate and correctly perform Critical Steps of SO23-5-1.8.1, Attachment 9.
Required Materials: SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin, Rev. 20.
Validation Time:          15 minutes    Time Critical: N/A    Completion Time:    ________ minutes Comments:
Page 1 of 6                SONGS Oct 2009 NRC SRO Admin JPM A.1.b Rev 0.doc


Required Materials: SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS  Time-to-Boil Margin, Rev. 20.
Appendix C                            JPM WORKSHEET                        Form ES-C-1 Result:  SAT      UNSAT Examiner (Print / Sign):                                            Date:
Validation Time:  15 minutes Time Critical: N/A Completion Time: ________ minutes
Page 2 of 6            SONGS Oct 2009 NRC SRO Admin JPM A.1.b Rev 0.doc


Comments:
Appendix C                       JPM WORKSHEET                         Form ES-C-1 CLASSROOM SETUP EXAMINER:
Appendix C JPM WORKSHEET Form ES-C-1 Page 2 of 6 SONGS Oct 2009 NRC SRO Admin JPM A.1.b Rev 0.doc Result:  SAT  UNSAT  Examiner (Print / Sign):  Date: 
PROVIDE the examinee with a copy of:
* SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of the RCS Time-to-Boil Margin.
Page 3 of 6       SONGS Oct 2009 NRC SRO Admin JPM A.1.b Rev 0.doc


Appendix C JPM WORKSHEET Form ES-C-1 Page 3 of 6 SONGS Oct 2009 NRC SRO Admin JPM A.1.b Rev 0.doc CLASSROOM SETUP EXAMINER: PROVIDE the examinee with a copy of:  SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of the RCS Time-to-Boil Margin.
Appendix C                             JPM STEPS                        Form ES-C-1
Appendix C JPM STEPS Form ES-C-1 Page 4 of 6 SONGS Oct 2009 NRC SRO Admin JPM A.1.b Rev 0.doc          - Check Mark Denotes Critical Step START TIME:
- Check Mark Denotes Critical Step                     START TIME:
Perform Step: 1 Determine Time-to-Boil margin temperature as follows:
Perform Step: 1   Determine Time-to-Boil margin temperature as follows:
BM act = BM ref x L cf x T cf x N cf  Determine BM ref Standard: REFERENCE BM ref  Table and INTERPOLATE between 20 and 30 days as follows:  
BMact = BMref x Lcf x Tcf x Ncf
* Determine BMref Standard:         REFERENCE BMref Table and INTERPOLATE between 20 and 30 days as follows:
[(39.09 - 32.4) X .2] + 32.4 = 33.74 minutes Comment:                                                          SAT  UNSAT Perform Step: 2  Determine Time-to-Boil margin temperature as follows:
BMact = BMref x Lcf x Tcf x Ncf
* Determine Lcf Standard:          REFERENCE Lcf Table and DETERMINE Lcf to be 1.008 at 27 inches.
Comment:                                                          SAT  UNSAT Perform Step: 3    Determine Time-to-Boil margin temperature as follows:
BMact = BMref x Lcf x Tcf x Ncf
* Determine Tcf Standard:          SELECT Tcf formula of Tcf = (212 - Thot) / 92.
Comment:                                                          SAT  UNSAT Perform Step: 4  Determine Time-to-Boil margin temperature as follows:
BMact = BMref x Lcf x Tcf x Ncf
* Determine Tcf Standard:          CALCULATE Tcf = (212 - 115.5) / 92 = 1.049 +/- 0.002 Comment:                                                          SAT  UNSAT Page 4 of 6      SONGS Oct 2009 NRC SRO Admin JPM A.1.b Rev 0.doc


[(39.09 - 32.4) X .2] + 32.4 =
Appendix C                            JPM STEPS                            Form ES-C-1 Perform Step: 5  Determine Time-to-Boil margin temperature as follows:
33.74 minutes Comment: SAT     UNSAT     Perform Step: 2 Determine Time-to-Boil margin temperature as follows:  
BMact = BMref x Lcf x Tcf x Ncf
* Determine Ncf where Ncf = 217 / (217- # new assemblies)
Standard:        CALCULATE Ncf = 217 / (217-101) = 1.87 Comment:                                                         SAT       UNSAT Perform Step: Determine Time-to-Boil margin temperature as follows:
BMact = BMref x Lcf x Tcf x Ncf Standard:        BMact = (33.74 min) X (1.008) X (1.049) X (1.87) = 66.7 +/- 2.5 minutes Terminating Cue:  This JPM is complete.
Comment:                                                        SAT      UNSAT STOP TIME:
Page 5 of 6      SONGS Oct 2009 NRC SRO Admin JPM A.1.b Rev 0.doc


BM act = BM ref x L cf x T cf x N cf Determine L cf Standard: REFERENCE L cf Table and DETERMINE L cf to be 1.008 at 27 inches.
Appendix C                      JPM CUE SHEET                        Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:
Comment: SAT     UNSAT      Perform Step: 3 Determine Time-to-Boil margin temperature as follows:
* Unit 3 is in MODE 6 after a 420 day run.
* The core reload is complete with 101 new fuel assemblies.
* Reactor Coolant System level is at Midloop (27 inches) to remove the Nozzle Dams in place on Steam Generators E-088 and E-089.
* Shutdown Cooling Heat Exchanger inlet temperature is 115.5 °F.
* The Reactor has been shut down for 22 days.
* The Pressurizer Manway is removed and is being used as the RCS vent.
INITIATING CUE:      The Shift Manager directs you to PERFORM the following:
* SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin.
* Outage specific Time to Boil Data Transmittal has NOT been provided by Reactor Engineering.
Page 6 of 6      SONGS Oct 2009 NRC SRO Admin JPM A.1.b Rev 0.doc


BM act = BM ref x L cf x T cf x N cf  Determine T cf Standard:
Appendix C                                    JPM WORKSHEET                                  Form ES-C-1 Facility: SONGS JPM # NRC RO A.2                    Task #185785      K/A #2.2.12          3.7/4.1
SELECT T cf formula of T cf = (212 - T hot) / 92. Comment: SAT      UNSAT      Perform Step: 4 Determine Time-to-Boil margin temperature as follows:


BM act = BM ref x L cf x T cf x N cf  Determine T cf Standard: CALCULATE T cf = (212 - 115.5) / 92 =
==Title:==
1.049 +/- 0.002 Comment: SAT     UNSAT Appendix C JPM STEPS Form ES-C-1 Page 5 of 6 SONGS Oct 2009 NRC SRO Admin JPM A.1.b Rev 0.doc Perform Step: 5 Determine Time-to-Boil margin temperature as follows:
Perform Core Exit Thermocouple Channel Checks Examinee (Print):
BM act = BM ref x L cf x T cf x N cf  Determine N cf  where  N cf = 217 / (217- # new assemblies)
Testing Method:
Standard:  CALCULATE N cf = 217 / (217-101) =
Simulated Performance:                                        Classroom:      X Actual Performance:              X                            Simulator:
1.87 Comment: SAT      UNSAT      Perform Step: 6 Determine Time-to-Boil margin temperature as follows:
Plant:
 
READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.
BM act = BM ref x L cf x T cf x N cf Standard:
When you complete the task successfully, the objective for this JPM will be satisfied.
BM act = (33.74 min) X (1.008)
Initial Conditions:      Given the following conditions:
X (1.049) X (1.87) =
* Unit 2 is in MODE 1 at 100% power.
66.7 +/- 2.5 minutes Terminating Cue: This JPM is complete.
* The monthly surveillance for the Core Exit Thermocouple and Heated Junction Thermocouple System is due.
Comment: SAT     UNSAT       STOP TIME:
Initiating Cue:         The Shift Manager directs you to PERFORM the following:
Appendix C JPM CUE SHEET Form ES-C-1 Page 6 of 6 SONGS Oct 2009 NRC SRO Admin JPM A.1.b Rev 0.doc INITIAL CONDITIONS: Given the following conditions:  Unit 3 is in MODE 6 after a 420 day run. The core reload is complete with 101 new fuel assemblies. Reactor Coolant System level is at Midloop (27 inches) to remove the Nozzle Dams in place on Steam Generators E-088 and E-089. Shutdown Cooling Heat Exchanger inlet temperature is 115.5 °F. The Reactor has been shut down for 22 days. The Pressurizer Manway is removed and is being used
* SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel Checks.
* Core Exit Thermocouple and Heated Junction Thermocouple data is attached.
* RECORD any Technical Specification LCO REQUIRED ACTIONS in the Comments Section of SO23-3-3.35.
Task Standard:           Locate and correctly perform Critical Steps SO23-3-3.35, Attachment 2.
Required Materials: SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Rev. 22.
Unit 2 Technical Specifications.
Validation Time:          25 minutes    Time Critical: N/A    Completion Time:    ________ minutes Comments:
Result:   SAT             UNSAT Examiner (Print / Sign):                                                          Date:
Page 1 of 9                SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc


as the RCS vent.  
Appendix C                        JPM WORKSHEET                      Form ES-C-1 CLASSROOM SETUP EXAMINER:
PROVIDE the examinee with a copy of:
* SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel Checks.
* INITIAL through Step 1.4.
* MARK Stop Here at Step 3.3.
* Qualified Safety Parameter Display System (QSPDS) pages 611, 622, and 721.
* Core Exit Thermocouple Data (part of JPM Cue Sheet).
* Unit 2 Technical Specifications.
Page 2 of 9        SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc


INITIATING CUE: The Shift Manager directs you to PERFORM the following: SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin. Outage specific Time to Boil Data Transmittal has NOT been provided by Reactor Engineering.  
Appendix C                            JPM STEPS                        Form ES-C-1
- Check Mark Denotes Critical Step                START TIME:
Perform Step: 1    Record the following: (QSPDS page 611)
* COLD LEG 1A TEMP.
* COLD LEG 1B TEMP.
Standard:          RECORD 541°F for Cold Leg 1A and Cold Leg 1B temperatures.
Comment:                                                    SAT    UNSAT Perform Step: 2  Verify Acceptance Criteria:
* QSPDS 1A & 1B Cold Leg Temps within 5°F?
Standard:          CHECK YES box for QSPDS 1A & 1B Cold Leg temperatures within 5°F.
Comment:                                                    SAT    UNSAT Perform Step: 3    Record the following: (QSPDS page 611)
* COLD LEG 2A TEMP.
* COLD LEG 2B TEMP.
Standard:          RECORD 540°F for Cold Leg 2A and Cold Leg 2B temperatures.
Comment:                                                    SAT    UNSAT Perform Step: 4  Verify Acceptance Criteria:
* QSPDS 2A & 2B Cold Leg Temps within 5°F?
Standard:          CHECK YES box for QSPDS 2A & 2B Cold Leg temperatures within 5°F.
Comment:                                                    SAT    UNSAT Perform Step: 5   Record the following: (QSPDS page 611)
* REP CET TEMPERATURE (QSPDS A).
* REP CET TEMPERATURE (QSPDS B).
Standard:          RECORD 611°F for REP CET (QSPDS A) and 612°F for REP CET (QSPDS B) temperatures.
Comment:                                                    SAT    UNSAT Page 3 of 9       SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc


Appendix C JPM WORKSHEET Form ES-C-1 Page 1 of 9 SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc        Facility: SONGS JPM # NRC RO A.2   Task #185785 K/A #2.2.12 3.7/4.1 Title: Perform Core Exit Thermocouple Channel Checks Examinee (Print):
Appendix C                             JPM STEPS                          Form ES-C-1 Perform Step: 6  Verify Acceptance Criteria:
Testing Method:
* REP CET Temperatures within 9°F?
Simulated Performance:  Classroom:  X Actual Performance: X  Simulator:
Standard:        CHECK YES box for REP CET temperatures within 9°F.
Plant:    READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue. When you complete the task successfully, the objective for this JPM will be satisfied.
Comment:                                                        SAT      UNSAT Perform Step: 7  Transfer the Highest operable Cold Leg Temperature of Step 2.1.1 into the "Low Limit" of Steps 2.1.6 and 2.1.8.
Initial Conditions: Given the following conditions:  Unit 2 is in MODE 1 at 100% power. The monthly surveillance for the Core Exit Thermocouple and Heated Junction Thermocouple System is due.
Standard:         RECORD 541°F in "Low Limit Temp." box for Steps 2.1.6 and 2.1.8.
Initiating Cue: The Shift Manager directs you to PERFORM the following: SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel Checks. Core Exit Thermocouple and Heated Junction Thermocouple data is attached. RECORD any Technical Specification LCO REQUIRED ACTIONS in the Comments Sect ion of SO23-3-3.35.
Comment:                                                       SAT      UNSAT Perform Step: 8 Transfer the Lowest operable REP CET temperature of Step 2.1.1 into the "High Limit" of Steps 2.1.6 and 2.1.8.
Task Standard: Locate and correctly perform Critical Steps SO23-3-3.35, Attachment 2.
Standard:         RECORD 611°F in "High Limit Temp." box for Steps 2.1.6 and 2.1.8.
Required Materials: SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Rev. 22. Unit 2 Technical Specifications.
Comment:                                                        SAT      UNSAT Perform Step: 9  Record CET Temperatures from QSPDS "A" Page 731:
Validation Time: 25 minutes Time Critical: N/A Completion Time: ________ minutes Comments:   Result: SAT UNSAT   Examiner (Print / Sign):  Date:
* Write "INOP" in data spaces for known inoperable CETs.
Appendix C JPM WORKSHEET Form ES-C-1 Page 2 of 9 SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc CLASSROOM SETUP EXAMINER: PROVIDE the examinee with a copy of:  SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel Checks. INITIAL through Step 1.4. MARK "Stop Here" at Step 3.3. Qualified Safety Parameter Display Sy stem (QSPDS) pages 611, 622, and 721. Core Exit Thermocouple Data (part of JPM Cue Sheet). Unit 2 Technical Specifications.
* Write N/A for G-20.
Standard:        RECORD N/A for CET G-20 and RECORD CET Temperatures from QSPDS A Core Exit Thermocouple Map (JPM Cue Sheet).
Comment:                                                        SAT      UNSAT Perform Step: 10 Record the total number of CETs which are within "In-Range" limits for each column.
Standard:         RECORD the following from QSPDS A Core Exit Thermocouple Map:
* QUAD 1 = 5; QUAD 2 = 6; QUAD 3 = 8; QUAD 4 = 6.
Comment:                                                       SAT      UNSAT Perform Step: 11 At least two CETs per Column are "In-Range" for Channel "A" QSPDS:
YES          NO Standard:         CHECK YES box.
Comment:                                                       SAT       UNSAT Page 4 of 9       SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc


Appendix C JPM STEPS Form ES-C-1 Page 3 of 9 SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc        - Check Mark Denotes Critical Step START TIME:
Appendix C                             JPM STEPS                             Form ES-C-1 Perform Step: 12 Record CET Temperatures from QSPDS "B" Page 731:
Perform Step: 1 Record the following: (QSPDS page 611) COLD LEG 1A TEMP. COLD LEG 1B TEMP.
* Write "INOP" in data spaces for known inoperable CETs.
Standard:
Standard:         RECORD CET Temperatures from QSPDS B Core Exit Thermocouple Map (JPM Cue Sheet).
RECORD 541°F for Cold Leg 1A and Cold Leg 1B temperatures.
Comment:                                                           SAT      UNSAT Perform Step: 13 Record the total number of CETs which are within the "In-Range" limits for each column.
Comment: SAT      UNSAT      Perform Step: 2 Verify Acceptance Criteria:  QSPDS 1A & 1B Cold Leg Temps within 5°F?
Standard:         RECORD the following from QSPDS B Core Exit Thermocouple Map:
Standard:
* QUAD 1 = 6; QUAD 2 = 7; QUAD 3 = 1; QUAD 4 = 6.
CHECK YES box for QSPDS 1A & 1B Cold Leg temperatures within 5°F. Comment: SAT      UNSAT      Perform Step: 3 Record the following: (QSPDS page 611)  COLD LEG 2A TEMP.
Comment:                                                           SAT      UNSAT Perform Step: 14 At least two CETs per Column are "In-Range" for channel "B" QSPDS:
COLD LEG 2B TEMP.
YES         NO Standard:         CHECK NO box.
Standard:
Comment:                                                           SAT      UNSAT Perform Step: 15 If any CETs are not "In-Range", then ensure a Notification has been initiated, and record NEW Notification numbers in the comments section.
RECORD 540°F for Cold Leg 2A and Cold Leg 2B temperatures.
Standard:         ANNOTATE that a Notification for QSPDS B CET failure has been initiated in the COMMENTS Section.
Comment: SAT      UNSAT      Perform Step: 4 Verify Acceptance Criteria:  QSPDS 2A & 2B Cold Leg Temps within 5°F?
Comment:                                                           SAT      UNSAT Perform Step: 16 Heated Junction Thermocouple System Channel Check
Standard:
* Record the differential temperatures of the Heated Junction Thermocouples (HJTCs) from QSPDS Page 721 on Table 2.
CHECK YES box for QSPDS 2A & 2B Cold Leg temperatures within 5°F. Comment: SAT      UNSAT      Perform Step: 5 Record the following: (QSPDS page 611)  REP CET TEMPERATURE (QSPDS A).
Standard:         RECORD the differential temperatures of the Heated Junction Thermocouples from QSPDS Page 721 on Table 2.
REP CET TEMPERATURE (QSPDS B).
Comment:                                                           SAT      UNSAT Page 5 of 9       SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc
Standard:
RECORD 611°F for REP CET (QSPDS A) and 612°F for REP CET (QSPDS B) temperatures.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 4 of 9 SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc Perform Step: 6 Verify Acceptance Criteria:  REP CET Temperatures within 9°F?
Standard: CHECK YES box for REP CET temperatures within 9°F.
Comment: SAT      UNSAT      Perform Step: 7  Transfer the Highest operable Cold Leg Temperat ure of Step 2.1.1 into the "Low Limit" of Steps 2.1.6 and 2.1.8.
Standard:
RECORD 541°F in "Low Limit Temp." box for Steps 2.1.6 and 2.1.8.
Comment: SAT      UNSAT      Perform Step: 8  Transfer the Lowest operable REP CET temperatur e of Step 2.1.1 into the "High Limit" of Steps 2.1.6 and 2.1.8.
Standard:
RECORD 611°F in "High Limit Temp." box for Steps 2.1.6 and 2.1.8.
Comment: SAT      UNSAT      Perform Step: 9 Record CET Temperatures from QSPDS "A" Page 731: Write "INOP" in data spaces for known inoperable CETs. Write 'N/A" for G-20.
Standard:
RECORD N/A for CET G-20 and RE CORD CET Temper atures from QSPDS A Core Exit Thermoc ouple Map (JPM Cue Sheet).
Comment: SAT      UNSAT      Perform Step: 10 Record the total number of CETs which are within "In-Range" limits for each column.
Standard: RECORD the following from QSPDS A Core Exit Thermocouple Map:  QUAD 1 = 5; QUAD 2 = 6; QUAD 3 = 8; QUAD 4 = 6.
Comment: SAT      UNSAT      Perform Step: 11 At least two CETs per Column are "In-Range" for Channel "A" QSPDS:
YES  NO Standard: CHECK YES box.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 5 of 9 SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc Perform Step: 12 Record CET Temperatures from QSPDS "B" Page 731:  Write "INOP" in data spaces for known inoperable CETs.
Standard:
RECORD CET Temperatures from Q SPDS B Core Exit Thermocouple Map (JPM Cue Sheet).
Comment: SAT      UNSAT     Perform Step: 13 Record the total number of CETs wh ich are within the "In-Range" limits for each column.
Standard: RECORD the following from QSPDS B Core Exit Thermocouple Map: QUAD 1 = 6; QUAD 2 = 7; QUAD 3 = 1; QUAD 4 = 6.
Comment: SAT      UNSAT     Perform Step: 14 At least two CETs per Column are "In-Range" for channel "B" QSPDS:
YES   NO Standard: CHECK NO box.
Comment: SAT      UNSAT     Perform Step: 15 If any CETs are not "In-Range", then ensure a Notification has been initiated, and record NEW Notification numbers in the comments section. Standard: ANNOTATE that a Notification for QSPDS B CET failure has been initiated in the COMMENTS Section.
Comment: SAT      UNSAT     Perform Step: 16 Heated Junction Thermocouple System Channel Check Record the differential temperatures of the Heated Junction Thermocouples (HJTCs) from QSPDS Page 721 on Table 2.
Standard:
RECORD the differential temper atures of the Heated Junction Thermocouples from QSPD S Page 721 on Table 2.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 6 of 9 SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc Perform Step: 17 At least One Head diffe rential temperature and at least Three Plenum differential temperatures for Channel A fall within the range of 40°F (lower limit) to 200°F (upper limit)?
YES  NO Standard: CHECK YES box.
Comment: SAT      UNSAT      Perform Step: 18 At least One Head diffe rential temperature and at least Three Plenum differential temperatures for Channel B fall within the range of 40°F (lower limit) to 200°F (upper limit)?


YES   NO Standard: CHECK YES box.
Appendix C                            JPM STEPS                              Form ES-C-1 Perform Step: 17 At least One Head differential temperature and at least Three Plenum differential temperatures for Channel A fall within the range of 40°F (lower limit) to 200°F (upper limit)?
Comment: SAT     UNSAT     Perform Step: 19 The Core Exit Thermocouple Channel Check is satisfactory by having selected YES in Step s 2.1.7 and 2.1.9.
YES         NO Standard:         CHECK YES box.
SAT   UNSAT Standard: CHECK UNSAT box.
Comment:                                                           SAT       UNSAT Perform Step: 18 At least One Head differential temperature and at least Three Plenum differential temperatures for Channel B fall within the range of 40°F (lower limit) to 200°F (upper limit)?
Comment: SAT     UNSAT     Perform Step: 20 The Heated Junction Thermocouple System Channel Check is  
YES          NO Standard:        CHECK YES box.
Comment:                                                          SAT      UNSAT Perform Step: 19 The Core Exit Thermocouple Channel Check is satisfactory by having selected YES in Steps 2.1.7 and 2.1.9.
SAT         UNSAT Standard:         CHECK UNSAT box.
Comment:                                                           SAT       UNSAT Perform Step: 20 The Heated Junction Thermocouple System Channel Check is satisfactory by having selected YES in Steps 2.2.2 and 2.2.3.
SAT          UNSAT Standard:        CHECK SAT box.
Comment:                                                          SAT      UNSAT Perform Step: 21  If either Step 3.1 or 3.2 is UNSAT, then for each equipment deficiency, ensure a separate LCOAR /EDMR and/or Notification exists. Record new LCOAR /EDMR/Notification numbers in the COMMENTS section.
Standard:        RECORD in the COMMENTS section that a LCOAR must be initiated.
Comment:                                                          SAT      UNSAT Page 6 of 9      SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc


satisfactory by having selected YES in Steps 2.
Appendix C                           JPM STEPS                           Form ES-C-1 Perform Step: 22 RECORD any Technical Specification LCO REQUIRED ACTIONS.
2.2 and 2.2.3.
Standard:         DETERMINE Technical Specification LCO 3.3.11 is applicable and record the following in the COMMENTS Section:
SAT  UNSAT Standard: CHECK SAT box.
* RECORD LCO 3.3.11.A; REQUIRED ACTION A.1 is applicable.
Comment: SAT      UNSAT      Perform Step: 21 If either Step 3.1 or 3.2 is UNSAT, then for each equipment deficiency, ensure a separate LCOAR /EDMR and/or Notification exists. Record new LCOAR /EDMR/Notification num bers in the COMMENTS section.
* One or more Functions with one required channel inoperable; restore required channel to OPERABLE status within 30 days Terminating Cue: This JPM is complete.
Standard: RECORD in the COMMENTS section that a LCOAR must be initiated.
Comment:                                                       SAT      UNSAT STOP TIME:
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 7 of 9 SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc Perform Step: 22 RECORD any Technical Specification LCO REQUIRED ACTIONS.
Page 7 of 9       SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc
Standard: DETERMINE Technical Specification LCO 3.3.11 is applicable and record the following in the COMMENTS Section: RECORD LCO 3.3.11.A; REQUIRED ACTION A.1 is applicable. One or more Functions with one required channel inoperable; restore required channel to OPERABLE status within 30 days Terminating Cue: This JPM is complete.
Comment: SAT      UNSAT       STOP TIME:
Appendix C JPM CUE SHEET Form ES-C-1 Page 8 of 9 SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc INITIAL CONDITIONS: Given the following conditions:  Unit 2 is in MODE 1 at 100% power. The monthly surveillance for the Core Exit Thermocouple and Heated Junction Thermocouple System is due.


INITIATING CUE: The Shift Manager directs you to PERFORM the following: SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel  
Appendix C                      JPM CUE SHEET                        Form ES-C-1 INITIAL CONDITIONS:  Given the following conditions:
* Unit 2 is in MODE 1 at 100% power.
* The monthly surveillance for the Core Exit Thermocouple and Heated Junction Thermocouple System is due.
INITIATING CUE:     The Shift Manager directs you to PERFORM the following:
* SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel Checks.
* Core Exit Thermocouple and Heated Junction Thermocouple data is attached.
* RECORD any Technical Specification LCO REQUIRED ACTIONS in the Comments Section of SO23-3-3.35.
Page 8 of 9      SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc


Checks. Core Exit Thermocouple and Heated Junction Thermocouple data is attached. RECORD any Technical Specification LCO REQUIRED ACTIONS in the Comments Section of SO23-3-3.35.  
Appendix C                        JPM CUE SHEET                        Form ES-C-1 CHANNEL A CORE EXIT THERMOCOUPLE MAP DATA (PAGE 731)
QUADRANT 1          QUADRANT 2            QUADRANT 3            QUADRANT 4 1      W6  583°F  1      T18  591°F    1    G9    582°F    1    T2    593°F 2      W13  590°F  2      L13  573°F    2    G13    576°F    2    R4    587°F 3      W18  558°F  3      L16  584°F    3    E6    589°F    3    R6    612°F 4      T13  582°F  4      G16  588°F    4    E9    588°F    4    L2    575°F 5      T16  589°F  5      G18  589°F    5    C4    560°F    5    L9    573°F 6      G20    84°F    6    C9    591°F    6    G2    606°F 7      E20  553°F    7    C16    590°F    7    E4    589°F 8    A8    572°F 9    A14    540°F CHANNEL B CORE EXIT THERMOCOUPLE MAP (PAGE 731)
QUADRANT 1          QUADRANT 2            QUADRANT 3            QUADRANT 4 1      Y8  541°F  1      T20  548°F    1    E13    583°F    1    T4    593°F 2      Y14  563°F  2      R16  585°F    2    E16    611°F    2    R2    585°F 3      W4    -     3     R18  584°F    3    C6      -     3     L4    600°F 4      W9  610°F  4      R20  601°F    4    C13    612°F    4    L6    592°F 5      W16  598°F  5      L18  594°F    5    C18      -      5    G4    589°F 6      T6  585°F  6      L20  576°F                          6    G6    608°F 7      T9  614°F  7      E18  588°F                          7    E2    540°F 8      R9  585°F 9      R13  588°F Page 9 of 9        SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc


Appendix C JPM CUE SHEET Form ES-C-1 Page 9 of 9 SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc CHANNEL A CORE EXIT THERMOCOUPLE MAP DATA (PAGE 731) QUADRANT 1 QUADRANT 2 QUADRANT 3 QUADRANT 4 1 W6 583°F 1 T18 591°F 1 G9 582°F 1 T2 593°F 2 W13 590°F 2 L13 573°F 2 G13 576°F 2 R4 587°F 3 W18 558°F 3 L16 584°F 3 E6 589°F 3 R6 612°F 4 T13 582°F 4 G16 588°F 4 E9 588°F 4 L2 575°F 5 T16 589°F 5 G18 589°F 5 C4 560°F 5 L9 573°F 6 G20 84°F 6 C9 591°F 6 G2 606°F 7 E20 553°F 7 C16 590°F 7 E4 589°F 8 A8 572°F 9 A14 540°F
Appendix C                                   JPM WORKSHEET                                  Form ES-C-1 Facility: SONGS JPM # NRC SRO A.3                  Task #192875      K/A #2.3.12          3.2/3.7


CHANNEL B CORE EXIT THERMOCOUPLE MAP (PAGE 731) QUADRANT 1 QUADRANT 2 QUADRANT 3 QUADRANT 4 1 Y8 541°F 1 T20 548°F 1 E13 583°F 1 T4 593°F 2 Y14 563°F 2 R16 585°F 2 E16 611°F 2 R2 585°F 3 W4 - 3 R18 584°F 3 C6 - 3 L4 600°F 4 W9 610°F 4 R20 601°F 4 C13 612°F 4 L6 592°F 5 W16 598°F 5 L18 594°F 5 C18 - 5 G4 589°F 6 T6 585°F 6 L20 576°F 6 G6 608°F 7 T9 614°F 7 E18 588°F 7 E2 540°F 8 R9 585°F 9 R13 588°F
==Title:==
 
Determine Containment Access Requirements Examinee (Print):
Appendix C JPM WORKSHEET Form ES-C-1 Page 1 of 7 SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc        Facility: SONGS JPM # NRC SRO A.3  Task #192875 K/A #2.3.12 3.2/3.7 Title: Determine Containment Access Requirements Examinee (Print):
Testing Method:
Testing Method:
Simulated Performance:   Classroom:   X Actual Performance: X Simulator:
Simulated Performance:                                       Classroom:     X Actual Performance:             X                           Simulator:
Plant:   READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue. When you complete the task successfully, the objective for this JPM will be satisfied.
Plant:
Initial Conditions:
READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.
Given the following conditions: Unit 2 is in MODE 1 at 99.98% power. Maintenance is planning a Containm ent entry to repair a steam leak by tightening the packing on a ME-088 instrument valve on the 63 foot elevation near Safety Injection Tank SIT-010. Chemistry has sampled the containment atmosphere with the following results: Oxygen levels are 19.3%. Combustible / Flammable Gas is 0.05%.
When you complete the task successfully, the objective for this JPM will be satisfied.
Initiating Cue:
Initial Conditions:     Given the following conditions:
The Shift Manager directs you to PERFORM the following: COMPLETE Attachment 1 of SO23-3-2.34, Containment Access Control, Inspections and Airlocks Operation. DETERMINE any ventilation require ments prior to the entry and RECORD in the Comments Section of Attachment 1. DETERMINE the proper Cont ainment Closeout Inspection Attachment to be performed when work is complete and RECORD in the COMMENTS Secti on of Attachment 1.
* Unit 2 is in MODE 1 at 99.98% power.
Task Standard: Locate and correctly perform Critical Steps SO23-3-2.34.
* Maintenance is planning a Containment entry to repair a steam leak by tightening the packing on a ME-088 instrument valve on the 63 foot elevation near Safety Injection Tank SIT-010.
Required Materials: SO23-3-2.34, Containment Access Control, Inspections and Airlocks Operation, Rev 22. Achieved
* Chemistry has sampled the containment atmosphere with the following results:
* Oxygen levels are 19.3%.
* Combustible / Flammable Gas is 0.05%.
Initiating Cue:         The Shift Manager directs you to PERFORM the following:
* COMPLETE Attachment 1 of SO23-3-2.34, Containment Access Control, Inspections and Airlocks Operation.
* DETERMINE any ventilation requirements prior to the entry and RECORD in the Comments Section of Attachment 1.
* DETERMINE the proper Containment Closeout Inspection Attachment to be performed when work is complete and RECORD in the COMMENTS Section of Attachment 1.
Task Standard:           Locate and correctly perform Critical Steps SO23-3-2.34.
Required Materials: SO23-3-2.34, Containment Access Control, Inspections and Airlocks Operation, Rev 22.
Achieved Validation Time:          10 minutes    Time Critical: N/A    Completion Time:    ________ minutes Page 1 of 7                SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc


Validation Time: 10 minutes Time Critical: N/A Completion Time: ________ minutes
Appendix C                            JPM WORKSHEET                        Form ES-C-1 Comments:
Result:   SAT      UNSAT Examiner (Print / Sign):                                              Date:
Page 2 of 7              SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc


Appendix C JPM WORKSHEET Form ES-C-1 Page 2 of 7 SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc Comments:  Result:  SAT  UNSAT  Examiner (Print / Sign):  Date:
Appendix C                       JPM WORKSHEET                         Form ES-C-1 CLASSROOM SETUP EXAMINER:
Appendix C JPM WORKSHEET Form ES-C-1 Page 3 of 7 SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc CLASSROOM SETUP EXAMINER: PROVIDE the examinee with a copy of: SO23-3-2.34, Containment A ccess Control, Inspections a nd Airlocks Operation. INITIAL Attachment 1 through Step 1.1. PROVIDE entire procedure.
PROVIDE the examinee with a copy of:
Appendix C JPM STEPS Form ES-C-1 Page 4 of 7 SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc         - Check Mark Denotes Critical Step START TIME:
* SO23-3-2.34, Containment Access Control, Inspections and Airlocks Operation.
Examiner Note: Examinee uses Section 6.8 as the reference for the following steps in Attachment 1.
* INITIAL Attachment 1 through Step 1.1.
Perform Step: 1 Check the appropriate conditions in the table per Main Body, Section 6.8.1 for Personnel and Emergency Airlocks or per SO23-5-1.8.1, Attachment for Shutdown Containment Closure Control for the Equipment Hatch.
* PROVIDE entire procedure.
Personnel Airlock Requirement(s):  Modes 1-4, ONE door and asso ciated equalizing valve shall always remain CLOSED with interlocks installed and Operable. ONE ramp is allowed.
Page 3 of 7       SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc
Standard:
REFER to 6.8.1 and DETERMINE that the Unit is in Mode 1; the


condition applies, and CHE CK this condition box.
Appendix C                            JPM STEPS                            Form ES-C-1
Comment: SAT      UNSAT     Perform Step: 2 Check the appropriate conditions in the table per Main Body, Section 6.8.1 for Personnel and Emergency Airlocks or per SO23-5-1.8.1, Attachment for Shutdown Containment Closure Control for the Equipment Hatch.
- Check Mark Denotes Critical Step                    START TIME:
Personnel Airlock Requirement: Door operation will be:
Examiner Note:    Examinee uses Section 6.8 as the reference for the following steps in Attachment 1.
Electrical Manual  N/A. Standard:
Perform Step: 1  Check the appropriate conditions in the table per Main Body, Section 6.8.1 for Personnel and Emergency Airlocks or per SO23-5-1.8.1, Attachment for Shutdown Containment Closure Control for the Equipment Hatch.
DETERMINE that Personnel Airlock Do or is fully functional and CHECK the ELECTRICAL or MANUAL box.
Personnel Airlock Requirement(s):
Comment: SAT      UNSAT     Perform Step: 3 Check the appropriate conditions in the table per Main Body, Section 6.8.1 for Personnel and Emergency Airlocks or per SO23-5-1.8.1, Attachment for Shutdown Containment Closure Control for the Equipment Hatch.  
* Modes 1-4, ONE door and associated equalizing valve shall always remain CLOSED with interlocks installed and Operable.
ONE ramp is allowed.
Standard:          REFER to 6.8.1 and DETERMINE that the Unit is in Mode 1; the condition applies, and CHECK this condition box.
Comment:                                                           SAT      UNSAT Perform Step: 2   Check the appropriate conditions in the table per Main Body, Section 6.8.1 for Personnel and Emergency Airlocks or per SO23-5-1.8.1, Attachment for Shutdown Containment Closure Control for the Equipment Hatch.
Personnel Airlock Requirement:
* Door operation will be: Electrical Manual  N/A.
Standard:         DETERMINE that Personnel Airlock Door is fully functional and CHECK the ELECTRICAL or MANUAL box.
Comment:                                                           SAT      UNSAT Perform Step: 3   Check the appropriate conditions in the table per Main Body, Section 6.8.1 for Personnel and Emergency Airlocks or per SO23-5-1.8.1, Attachment for Shutdown Containment Closure Control for the Equipment Hatch.
Personnel Airlock Requirement:
* Containment Airlock Operator (Hatch Operator) is required, and posted at outer door.
Standard:          REFER to 6.8.1 and DETERMINE that the Unit is in Mode 1; the condition applies, and CHECK this condition box.
Comment:                                                          SAT      UNSAT Page 4 of 7        SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc


Personnel Airlock Requirement:  Containment Airlock Operator (H atch Operator) is required, and posted at outer door.
Appendix C                           JPM STEPS                               Form ES-C-1 Perform Step: 4 Check the appropriate conditions in the table per Main Body, Section 6.8.1 for Personnel and Emergency Airlocks or per SO23-5-1.8.1, Attachment for Shutdown Containment Closure Control for the Equipment Hatch.
Standard:
Emergency Airlock Requirement:
REFER to 6.8.1 and DETERMINE that the Unit is in Mode 1; the condition applies, and CHECK this condition box.
* Emergency Airlock to remain unlocked and posted by Security.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 5 of 7 SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc Perform Step: 4 Check the appropriate conditions in the table per Main Body, Section 6.8.1 for Personnel and Emergency Airlocks or per SO23-5-1.8.1, Attachment for Shutdown Containment Closure Control for the Equipment Hatch.
Emergency Airlock Requirement: Emergency Airlock to remain unlocked and posted by Security.
Emergency use only.
Emergency use only.
Standard: REFER to 6.8.1 and DETERMINE that two egress paths are always required and CHECK this condition box.
Standard:       REFER to 6.8.1 and DETERMINE that two egress paths are always required and CHECK this condition box.
Comment: SAT     UNSAT     Perform Step: 5 Check the appropriate conditions in the table per Main Body, Section 6.8.1 for Personnel and Emergency Airlocks or per SO23-5-1.8.1, Attachment for Shutdown Containment Closure Control for the Equipment Hatch.
Comment:                                                         SAT       UNSAT Perform Step: 5 Check the appropriate conditions in the table per Main Body, Section 6.8.1 for Personnel and Emergency Airlocks or per SO23-5-1.8.1, Attachment for Shutdown Containment Closure Control for the Equipment Hatch.
Equipment Hatch Requirement: Equipment Hatch CLOSED Standard:
Equipment Hatch Requirement:
REFER to 6.8.1 and DETERMINE that the Unit is in Mode 1; the condition applies, and CHE CK this condition box.
* Equipment Hatch CLOSED Standard:       REFER to 6.8.1 and DETERMINE that the Unit is in Mode 1; the condition applies, and CHECK this condition box.
Comment: SAT     UNSAT     Examiner Note: The examinee refers to Section 6.2, Containment Entry for the following step.
Comment:                                                         SAT       UNSAT Examiner Note:   The examinee refers to Section 6.2, Containment Entry for the following step.
Perform Step: 6 Determine any ventilation requirements prior to the entry per Section 6.2, Containment Entry.
Perform Step: 6 Determine any ventilation requirements prior to the entry per Section 6.2, Containment Entry.
Standard: REFER to Section 6.2, Containment Entry: DETERMINE that Chemistry sa mple results show an oxygen deficient atmosphere and PERFORM one (1) of the following: DON Self-contained respirat ory protection prior to Containment entry, or   PERFORM a Containment Mini-Purge. RECORD this information in the Comments Section of .
Standard:       REFER to Section 6.2, Containment Entry:
Comment: SAT     UNSAT Appendix C JPM STEPS Form ES-C-1 Page 6 of 7 SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc         Examiner Note: The examinee refers to Section 6.9, Containment Loose Debris Inspections for the following step.
* DETERMINE that Chemistry sample results show an oxygen deficient atmosphere and PERFORM one (1) of the following:
Perform Step: 7 Determine the proper Containment Closeout Inspection Attachment to be performed when work is complete per Section 6.9, Containment Loose Debris Inspections.
* DON Self-contained respiratory protection prior to Containment entry, or
Standard: REFER to Section 6.9, Containment Loose Debris Inspections: DETERMINE that when in MODE 1 or 2 an Inspection of < 7 work areas during or following a C ontainment entry and PERFORM , Containment Work Area Loose Debris Inspection. RECORD this information in the Comments Section of   . Terminating Cue: This JPM is complete.
* PERFORM a Containment Mini-Purge.
Comment: SAT     UNSAT       STOP TIME:
* RECORD this information in the Comments Section of Attachment 1.
Appendix C JPM CUE SHEET Form ES-C-1 Page 7 of 7 SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc INITIAL CONDITIONS: Given the following conditions:  Unit 2 is in MODE 1 at 99.98% power. Maintenance is planning a Containment entry to repair a steam leak by tightening the packing on a ME-088 instrument valve on the 63 foot elevation near Safety Injection Tank SIT-010. Chemistry has sampled the containment atmosphere with the following results:  Oxygen levels are 19.3%. Combustible / Flammable Gas is 0.05%.
Comment:                                                         SAT       UNSAT Page 5 of 7     SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc
 
Appendix C                          JPM STEPS                              Form ES-C-1 Examiner Note:   The examinee refers to Section 6.9, Containment Loose Debris Inspections for the following step.
Perform Step: 7 Determine the proper Containment Closeout Inspection Attachment to be performed when work is complete per Section 6.9, Containment Loose Debris Inspections.
Standard:       REFER to Section 6.9, Containment Loose Debris Inspections:
* DETERMINE that when in MODE 1 or 2 an Inspection of < 7 work areas during or following a Containment entry and PERFORM Attachment 8, Containment Work Area Loose Debris Inspection.
* RECORD this information in the Comments Section of Attachment 1.
Terminating Cue: This JPM is complete.
Comment:                                                       SAT       UNSAT STOP TIME:
Page 6 of 7     SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc


INITIATING CUE: The Shift Manager directs you to PERFORM the following: COMPLETE Attachment 1 of SO23-3-2.34, Containment Access Control, Inspections and Airlocks Operation. DETERMINE any ventilation re quirements prior to the entry and RECORD in the Comments Section of . DETERMINE the proper Containment Closeout Inspection Attachment to be performed when work is complete and RECORD in the COMMENTS Section of .  
Appendix C                      JPM CUE SHEET                          Form ES-C-1 INITIAL CONDITIONS:  Given the following conditions:
* Unit 2 is in MODE 1 at 99.98% power.
* Maintenance is planning a Containment entry to repair a steam leak by tightening the packing on a ME-088 instrument valve on the 63 foot elevation near Safety Injection Tank SIT-010.
* Chemistry has sampled the containment atmosphere with the following results:
* Oxygen levels are 19.3%.
* Combustible / Flammable Gas is 0.05%.
INITIATING CUE:     The Shift Manager directs you to PERFORM the following:
* COMPLETE Attachment 1 of SO23-3-2.34, Containment Access Control, Inspections and Airlocks Operation.
* DETERMINE any ventilation requirements prior to the entry and RECORD in the Comments Section of Attachment 1.
* DETERMINE the proper Containment Closeout Inspection Attachment to be performed when work is complete and RECORD in the COMMENTS Section of Attachment 1.
Page 7 of 7      SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc


Appendix C JPM WORKSHEET Form ES-C-1 Page 1 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc        Facility: SONGS JPM # NRC SRO A.4   Task #192840 K/A #2.4.44 2.4/4.4 Title: Determine Protective Actions Examinee (Print):
Appendix C                                   JPM WORKSHEET                                   Form ES-C-1 Facility: SONGS JPM # NRC SRO A.4                   Task #192840     K/A #2.4.44           2.4/4.4
 
==Title:==
Determine Protective Actions Examinee (Print):
Testing Method:
Testing Method:
Simulated Performance:   Classroom:   X Actual Performance: X Simulator:
Simulated Performance:                                       Classroom:     X Actual Performance:             X                           Simulator:
Plant:   READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue. When you complete the task successfully, the objective for this JPM will be satisfied.
Plant:
Initial Conditions:
READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.
Given the following conditions: Unit 3 has experienced a large break Loss of Coolant Accident with resultant fuel failure. A GENERAL EMERGENCY (Tab B4-1) was declared and the following Protective Actions were recommended: Evacuate State Beach.
When you complete the task successfully, the objective for this JPM will be satisfied.
Evacuate PAZ 1 and 4. Ingest Potassium Iodide (KI) in PAZ 1 and 4. There has been a breach in the Cont ainment Integrity resulting in a large airborne radioactive release. The projected dose at the Ex clusion Area Boundary is 5200 mR TEDE. The current wind direction is from 101 degrees at 20 mph. There are no known impediments to evacuation.
Initial Conditions:     Given the following conditions:
The release duration is unknown.
* Unit 3 has experienced a large break Loss of Coolant Accident with resultant fuel failure.
Initiating Cue: The Shift Manager directs you to EVALUATE conditions and determine if a new Protective Action Recommendation is required per SO123-VIII-10.3, Protective Action Recommendations. DOCUMENT the results in the Meteorological Data box on EP(123)10, Event Notification Form.
* A GENERAL EMERGENCY (Tab B4-1) was declared and the following Protective Actions were recommended:
Task Standard: Locate and correctly perform Critical Steps SO123-VIII-10.3.  
* Evacuate State Beach.
* Evacuate PAZ 1 and 4.
* Ingest Potassium Iodide (KI) in PAZ 1 and 4.
* There has been a breach in the Containment Integrity resulting in a large airborne radioactive release.
* The projected dose at the Exclusion Area Boundary is 5200 mR TEDE.
* The current wind direction is from 101 degrees at 20 mph.
* There are no known impediments to evacuation.
* The release duration is unknown.
Initiating Cue:         The Shift Manager directs you to EVALUATE conditions and determine if a new Protective Action Recommendation is required per SO123-VIII-10.3, Protective Action Recommendations.
* DOCUMENT the results in the Meteorological Data box on EP(123)10, Event Notification Form.
Task Standard:           Locate and correctly perform Critical Steps SO123-VIII-10.3.
Required Materials: SO123-VIII-10.3, Protective Action Recommendations, Rev. 12.
EP(123)10, Event Notification Form, Rev. 12.
Page 1 of 7                SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc


Required Materials: SO123-VIII-10.3, Protective Action Recommendations, Rev. 12. EP(123)10, Event Notification Form, Rev. 12.
Appendix C                             JPM WORKSHEET                           Form ES-C-1 Validation Time:     10 minutes Time Critical: N/A Completion Time: ________ minutes Comments:
Appendix C JPM WORKSHEET Form ES-C-1 Page 2 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc Validation Time: 10 minutes Time Critical: N/A Completion Time: ________ minutes Comments:   Result: SAT UNSAT   Examiner (Print / Sign): Date:
Result:   SAT         UNSAT Examiner (Print / Sign):                                             Date:
Appendix C JPM WORKSHEET Form ES-C-1 Page 3 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc CLASSROOM SETUP EXAMINER: PROVIDE the examinee with a copy of:  SO123-VIII-10.3, Protective Action Recommendations. EP(123)10, Event Notification Form.
Page 2 of 7             SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc
Appendix C JPM STEPS Form ES-C-1 Page 4 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc          - Check Mark Denotes Critical Step START TIME:
Perform Step: 1 If a PAR Upgrade is necessary, then obtain:  The 15-minute average wind directi on (From), if available (Refer to Section 1.1 of this Attachment). Information concerning KNOW N evacuation impediments (Refer to Section 1.2 of this Attachment). Radiological release parameters (Refer to Section 1.3 of this Attachment).
Standard: DETERMINE from the initial conditions that t he 15 min average wind direction is 101&deg;, no known evacua tion pediments exist, and that the projected dose at EAB is 5200 mR TEDE.
Comment: SAT      UNSAT      Examiner Note: The next set of steps follows the progression through Attachment 2 of SO123-VIII-10.3.
Perform Step: 2 Utilize the table (General Emergency PAR Table) found on page 3 of this Attachment and/or Attachme nt 2 (GE Protective Action Recommendations Flowchart) to make the appropriate GE PAR or GE PAR Upgrade..
Standard:
ENTER Attachment 2, GE PAR fl owchart at the General Emergency box. Comment: SAT      UNSAT      Perform Step: 3 Utilize the table (General Emergency PAR Table) found on page 3 of this Attachment and/or Attach ment 2 (GE Protective Action Recommendations Flowchart) to make the appropriate GE PAR or GE PAR Upgrade. Are there known evacuation pediments?
Standard:
DETERMINE that there are no known evacuation pediments, ANSWER NO, and TAKE the right hand path.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 5 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc Perform Step: 4 Utilize the table (General Emergency PAR Table) found on page 3 of this Attachment and/or Attachme nt 2 (GE Protective Action Recommendations Flowchart) to make the appropriate GE PAR or GE PAR Upgrade. Radiological Rel ease less than 1 hour?
Standard:
DETERMINE that the release duration is unknown, ANSWER UNKNOWN, and TAKE the st raight through path.
Comment: SAT      UNSAT      Perform Step: 5 Utilize the table (General Emergency PAR Table) found on page 3 of this Attachment and/or Attachme nt 2 (GE Protective Action Recommendations Flowchart) to make the appropriate GE PAR or GE PAR Upgrade. Dose  5000 mR (measured or projected) TEDE at the EAB and the wind towards PAZ 5?
Standard:
DETERMINE that dose is  5000 mR but wind direction at 101&deg; is NOT towards PAZ 5, ANSWER NO, and TAKE the path to the left.
Comment: SAT      UNSAT      Perform Step: 6 Utilize the table (General Emergency PAR Table) found on page 3 of this Attachment and/or Attachme nt 2 (GE Protective Action Recommendations Flowchart) to make the appropriate GE PAR or GE PAR Upgrade.
Standard:  DETERMINE PAR to be:  Evacuate the State Beach. Evacuate PAZ 1, 2, and 4 (affected downwind PAZs). Ingest Potassium Iodide (KI) for the affected PAZs 1, 2, and 4.
Comment: SAT      UNSAT      Perform Step: 7 Document PAR results on EP(123)10, Event Notification Form Standard:
CHECK the "is" box as there is a need for protective action beyond the Exclusion Area Boundary.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 6 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc Perform Step: 8 Document PAR results on EP(123)10, Event Notification Form Standard:
CHECK the "Evacuate State Beach" box.
Comment: SAT      UNSAT      Perform Step: 9 Document PAR results on EP(123)10, Event Notification Form Standard:  CHECK the "Evacuate PAZ(s)" box and CHECK boxes 1, 2, and 4.
Comment: SAT      UNSAT      Perform Step: 10 Document PAR results on EP(123)10, Event Notification Form Standard:
CHECK the "Ingest KI PAZ(s)" box and CHECK boxes 1, 2, and 4. Terminating Cue: This JPM is complete.
Comment: SAT      UNSAT      STOP TIME:
Appendix C JPM CUE SHEET Form ES-C-1 Page 7 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc INITIAL CONDITIONS: Given the following conditions:  Unit 3 has experienced a large break Loss of Coolant Accident with resultant fuel failure. A GENERAL EMERGENCY (Tab B4-1) was declared and the following Protective Actions were recommended:  Evacuate State Beach. Evacuate PAZ 1 and 4. Ingest Potassium Iodide (KI) in PAZ 1 and 4. There has been a breach in the Containment Integrity resulting in a large airbor ne radioactive release. The projected dose at the Exclusion Area Boundary is 5200 mR TEDE. The current wind directi on is from 101 degrees at 20 mph. There are no known impediments to evacuation. The release duration is unknown.


INITIATING CUE: The Shift Manager directs you to EVALUATE conditions and determine if a new Protect ive Action Recommendation is required per SO123-VIII-10.3, Protective Action Recommendations. DOCUMENT the results in the Meteorological Data box on EP(123)10, Event Notification Form.  
Appendix C                          JPM WORKSHEET                  Form ES-C-1 CLASSROOM SETUP EXAMINER:
PROVIDE the examinee with a copy of:
* SO123-VIII-10.3, Protective Action Recommendations.
* EP(123)10, Event Notification Form.
Page 3 of 7        SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc


ES-301 Control Room / In-Plant Systems Outline Form ES-301-2 NUREG-1021, Revision 9.1 1 of 3 SONGS Oct 2009 NRC ES-301-2 Rev 1 Facility: SONGS Units 2 and 3  Date of Examination: 10/19/09 Exam Level:
Appendix C                              JPM STEPS                            Form ES-C-1
RO      SRO(I)      SRO (U)   Operating Test No.: NRC Control Room Systems
- Check Mark Denotes Critical Step                      START TIME:
@ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U, including 1 ESF) System / JPM Title Type Code* Safety FunctionS-1 001 - Control Rod Drive System (New) Perform Immediate Actions for Control Room Evacuation A, N, S 1 S-2 004 - Chemical and Volume Control System (J083S) Secure Charging and Letdown D, S 2 S-3 006 - Emergency Core Cooling System (J073S) Align Simultaneous Hot Leg and Cold Leg Injection A, M, EN, S 3 S-4 003 - Reactor Coolant Pump System (J027FS) Start a Reactor Coolant Pump A, D, L, S 4-P S-5 022 - Containment Spray System (J049FS) Terminate Containment Spray  A, D, EN, S 5 S-6 064 - Emergency Diesel Generator System (J054S) Restore 1E Bus 2A06 From Cross-Tie Operations D, S 6 C-7 073 - Process Radiation Monitoring System (J120S) (RO only) Reset and Restore Fuel Handling Isolation System C, D 7 C-8 029 - Containment Purge System (J147FS) Place Containment Mini-Purge in Service A, C, D 8 In-Plant Systems
Perform Step: 1   If a PAR Upgrade is necessary, then obtain:
@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
* The 15-minute average wind direction (From), if available (Refer to Section 1.1 of this Attachment).
P-1 059 - Main Feedwater System (J109) Locally Operate Main Feedwater Regulating Valve D 4-S P-2 004 - Chemical and Volume Control System (New) Locally Align Charging Pump Suction to RWST E, N, R 2 P-3 012 - Reactor Protection System (J021F) Locally Open Reactor Trip Breakers (TIME CRITICAL)
* Information concerning KNOWN evacuation impediments (Refer to Section 1.2 of this Attachment).
E, M, R  7 ES-301 Control Room / In-Plant Systems Outline Form ES-301-2 NUREG-1021, Revision 9.1 2 of 3 SONGS Oct 2009 NRC ES-301-2 Rev 1
* Radiological release parameters (Refer to Section 1.3 of this Attachment).
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
Standard:          DETERMINE from the initial conditions that the 15 min average wind direction is 101&deg;, no known evacuation pediments exist, and that the projected dose at EAB is 5200 mR TEDE.
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank  9 /  8 / 4 (E)mergency or abnormal in-plant  1 /  1 /  1 (EN)gineered safety feature -  /  -  /  1 (control room system) (L)ow Power / Shutdown  1 /  1 /  1 (N)ew or (M)odified from bank including 1(A)  2 /  2 /  1 (P)revious 2 exams  3 / 3 /  2 (randomly selected) (R)CA  1 /  1 /  1 (S)imulator NRC JPM Examination Summary Description S-1 The candidate will perform the immediate operator actions for a Control Room Evacuation per Abnormal Operating Inst ruction SO23-13-02, Shutdown from Outside the Control Room. The alternate path is performed when a Reactor Coolant Pump breaker fails to open. This is a new JPM under the Control Rod Drive System - Reactivity Control safety f unction. This is a PRA significant action.  
Comment:                                                          SAT      UNSAT Examiner Note:    The next set of steps follows the progression through Attachment 2 of SO123-VIII-10.3.
Perform Step: 2   Utilize the table (General Emergency PAR Table) found on page 3 of this Attachment and/or Attachment 2 (GE Protective Action Recommendations Flowchart) to make the appropriate GE PAR or GE PAR Upgrade..
Standard:          ENTER Attachment 2, GE PAR flowchart at the General Emergency box.
Comment:                                                          SAT      UNSAT Perform Step: 3    Utilize the table (General Emergency PAR Table) found on page 3 of this Attachment and/or Attachment 2 (GE Protective Action Recommendations Flowchart) to make the appropriate GE PAR or GE PAR Upgrade.
* Are there known evacuation pediments?
Standard:          DETERMINE that there are no known evacuation pediments, ANSWER NO, and TAKE the right hand path.
Comment:                                                          SAT      UNSAT Page 4 of 7        SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc


S-2 The candidate will secure Charging and Letdown as part of an RCS leak investigation per SO23-3-2.
Appendix C                            JPM STEPS                              Form ES-C-1 Perform Step: 4  Utilize the table (General Emergency PAR Table) found on page 3 of this Attachment and/or Attachment 2 (GE Protective Action Recommendations Flowchart) to make the appropriate GE PAR or GE PAR Upgrade.
1.02, Chemical and Volume Control System Outage Evolutions. This is a bank JPM under the Chemical and Volume Control System -
* Radiological Release less than 1 hour?
Reactor Coolant Inventory Control safety function.  
Standard:        DETERMINE that the release duration is unknown, ANSWER UNKNOWN, and TAKE the straight through path.
Comment:                                                          SAT      UNSAT Perform Step: 5  Utilize the table (General Emergency PAR Table) found on page 3 of this Attachment and/or Attachment 2 (GE Protective Action Recommendations Flowchart) to make the appropriate GE PAR or GE PAR Upgrade.
* Dose  5000 mR (measured or projected) TEDE at the EAB and the wind towards PAZ 5?
Standard:        DETERMINE that dose is  5000 mR but wind direction at 101&deg; is NOT towards PAZ 5, ANSWER NO, and TAKE the path to the left.
Comment:                                                          SAT      UNSAT Perform Step: 6  Utilize the table (General Emergency PAR Table) found on page 3 of this Attachment and/or Attachment 2 (GE Protective Action Recommendations Flowchart) to make the appropriate GE PAR or GE PAR Upgrade.
Standard:        DETERMINE PAR to be:
* Evacuate the State Beach.
* Evacuate PAZ 1, 2, and 4 (affected downwind PAZs).
* Ingest Potassium Iodide (KI) for the affected PAZs 1, 2, and 4.
Comment:                                                          SAT      UNSAT Perform Step: 7 Document PAR results on EP(123)10, Event Notification Form Standard:        CHECK the is box as there is a need for protective action beyond the Exclusion Area Boundary.
Comment:                                                          SAT      UNSAT Page 5 of 7      SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc


S-3 The candidate will align simultaneous Hot Leg and Cold Leg Injection during a Loss of Coolant Accident per SO23-12-11, EOI Supporting Attachments, Attachment 11, Simultaneous Hot / Cold Leg Injection. The alternate path requires the operator to perform actions with a High Pressure Safety Injection Pump out-of-service. This is a modified bank JPM under the Emergency Core Cooling
Appendix C                        JPM STEPS                            Form ES-C-1 Perform Step: 8  Document PAR results on EP(123)10, Event Notification Form Standard:          CHECK the Evacuate State Beach box.
Comment:                                                    SAT        UNSAT Perform Step: 9  Document PAR results on EP(123)10, Event Notification Form Standard:          CHECK the Evacuate PAZ(s) box and CHECK boxes 1, 2, and 4.
Comment:                                                    SAT        UNSAT Perform Step: 10 Document PAR results on EP(123)10, Event Notification Form Standard:          CHECK the Ingest KI PAZ(s) box and CHECK boxes 1, 2, and 4.
Terminating Cue:  This JPM is complete.
Comment:                                                    SAT        UNSAT STOP TIME:
Page 6 of 7      SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc


System - Reactor Pressure Control safety function. This is a PRA significant action.
Appendix C                      JPM CUE SHEET                          Form ES-C-1 INITIAL CONDITIONS:  Given the following conditions:
S-4 The candidate will start t he fourth Reactor Coolant Pump during a Plant Startup per SO23-3-1.7, Reactor Coolant Pump Operation. The alternate path occurs when Component Cooling Water flow is lost to the RCP and the operator trips the  
* Unit 3 has experienced a large break Loss of Coolant Accident with resultant fuel failure.
* A GENERAL EMERGENCY (Tab B4-1) was declared and the following Protective Actions were recommended:
* Evacuate State Beach.
* Evacuate PAZ 1 and 4.
* Ingest Potassium Iodide (KI) in PAZ 1 and 4.
* There has been a breach in the Containment Integrity resulting in a large airborne radioactive release.
* The projected dose at the Exclusion Area Boundary is 5200 mR TEDE.
* The current wind direction is from 101 degrees at 20 mph.
* There are no known impediments to evacuation.
* The release duration is unknown.
INITIATING CUE:      The Shift Manager directs you to EVALUATE conditions and determine if a new Protective Action Recommendation is required per SO123-VIII-10.3, Protective Action Recommendations.
* DOCUMENT the results in the Meteorological Data box on EP(123)10, Event Notification Form.
Page 7 of 7      SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc


Reactor Coolant Pump per the alarm re sponse procedure. This is a bank JPM ES-301 Control Room / In-Plant Systems Outline Form ES-301-2 NUREG-1021, Revision 9.1 3 of 3 SONGS Oct 2009 NRC ES-301-2 Rev 1 under the Reactor Coolant Pump System
ES-301                       Control Room / In-Plant Systems Outline               Form ES-301-2 Facility:        SONGS Units 2 and 3                        Date of Examination:    10/19/09 Exam Level:      RO        SRO(I)        SRO (U)          Operating Test No.:    NRC Control Room Systems@ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U, including 1 ESF)
- Heat Removal from Reactor Core safety function.
System / JPM Title                            Type Code*  Safety Function S-1    001 - Control Rod Drive System (New)                              A, N, S          1 Perform Immediate Actions for Control Room Evacuation S-2    004 - Chemical and Volume Control System (J083S)                    D, S            2 Secure Charging and Letdown S-3     006 - Emergency Core Cooling System (J073S)                    A, M, EN, S        3 Align Simultaneous Hot Leg and Cold Leg Injection S-4    003 - Reactor Coolant Pump System (J027FS)                      A, D, L, S        4-P Start a Reactor Coolant Pump S-5     022 - Containment Spray System (J049FS)                        A, D, EN, S        5 Terminate Containment Spray S-6    064 - Emergency Diesel Generator System (J054S)                    D, S            6 Restore 1E Bus 2A06 From Cross-Tie Operations C-7    073 - Process Radiation Monitoring System (J120S) (RO only)        C, D            7 Reset and Restore Fuel Handling Isolation System C-8    029 - Containment Purge System (J147FS)                          A, C, D          8 Place Containment Mini-Purge in Service In-Plant Systems@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
S-5 The candidate will be required to terminate Containment Spra y per SO23-12-11, EOI Supporting Attachments, Attachment 2, Floating Steps. The alternate path occurs when there is only one Containment Emergency Cooling Unit operating and the actions of the RNO path are requi red. This is a bank JPM under the Containment Spray System - Contai nment Integrity safety function.
P-1    059 - Main Feedwater System (J109)                                  D            4-S Locally Operate Main Feedwater Regulating Valve P-2    004 - Chemical and Volume Control System (New)                    E, N, R          2 Locally Align Charging Pump Suction to RWST P-3    012 - Reactor Protection System (J021F)                          E, M, R          7 Locally Open Reactor Trip Breakers (TIME CRITICAL)
NUREG-1021, Revision 9.1                    1 of 3        SONGS Oct 2009 NRC ES-301-2 Rev 1


S-6 The candidate will be required to restore from 1E 4160V unit cross-tie operations per SO23-6-2, Transferring of 4 kV Buses, Section 6.9, Restoring from 1E 4kV Bus 3A06 to 2A06 Cross-Tie Operation. This is a bank JPM under the AC Electrical Distribution System - Electrical safety function.
ES-301                            Control Room / In-Plant Systems Outline                    Form ES-301-2
@        All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes                                Criteria for RO / SRO-I / SRO-U (A)lternate path                                                            4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                          9/8/4 (E)mergency or abnormal in-plant                                            1/1/1 (EN)gineered safety feature                                      - / - /  1 (control room system)
(L)ow Power / Shutdown                                                      1/1/1 (N)ew or (M)odified from bank including 1(A)                                2/2/1 (P)revious 2 exams                                                3 /  3 /  2 (randomly selected)
(R)CA                                                                        1/1/1 (S)imulator NRC JPM Examination Summary Description S-1 The candidate will perform the immediate operator actions for a Control Room Evacuation per Abnormal Operating Instruction SO23-13-02, Shutdown from Outside the Control Room. The alternate path is performed when a Reactor Coolant Pump breaker fails to open. This is a new JPM under the Control Rod Drive System - Reactivity Control safety function. This is a PRA significant action.
S-2 The candidate will secure Charging and Letdown as part of an RCS leak investigation per SO23-3-2.1.02, Chemical and Volume Control System Outage Evolutions. This is a bank JPM under the Chemical and Volume Control System -
Reactor Coolant Inventory Control safety function.
S-3 The candidate will align simultaneous Hot Leg and Cold Leg Injection during a Loss of Coolant Accident per SO23-12-11, EOI Supporting Attachments, Attachment 11, Simultaneous Hot / Cold Leg Injection. The alternate path requires the operator to perform actions with a High Pressure Safety Injection Pump out-of-service. This is a modified bank JPM under the Emergency Core Cooling System - Reactor Pressure Control safety function. This is a PRA significant action.
S-4 The candidate will start the fourth Reactor Coolant Pump during a Plant Startup per SO23-3-1.7, Reactor Coolant Pump Operation. The alternate path occurs when Component Cooling Water flow is lost to the RCP and the operator trips the Reactor Coolant Pump per the alarm response procedure. This is a bank JPM NUREG-1021, Revision 9.1                      2 of 3          SONGS Oct 2009 NRC ES-301-2 Rev 1


ES-301                    Control Room / In-Plant Systems Outline        Form ES-301-2 under the Reactor Coolant Pump System - Heat Removal from Reactor Core safety function.
S-5 The candidate will be required to terminate Containment Spray per SO23-12-11, EOI Supporting Attachments, Attachment 2, Floating Steps. The alternate path occurs when there is only one Containment Emergency Cooling Unit operating and the actions of the RNO path are required. This is a bank JPM under the Containment Spray System - Containment Integrity safety function.
S-6 The candidate will be required to restore from 1E 4160V unit cross-tie operations per SO23-6-2, Transferring of 4 kV Buses, Section 6.9, Restoring from 1E 4kV Bus 3A06 to 2A06 Cross-Tie Operation. This is a bank JPM under the AC Electrical Distribution System - Electrical safety function.
C-7 The candidate will reset and re-establish normal Fuel Building Ventilation after isolation due to a high radiation signal per SO23-3-2.22, Engineered Safety Features Actuation Systems Operation, Attachment 23, FHIS Reset and Restoration. This is a bank JPM under the Area Radiation Monitoring System -
C-7 The candidate will reset and re-establish normal Fuel Building Ventilation after isolation due to a high radiation signal per SO23-3-2.22, Engineered Safety Features Actuation Systems Operation, Attachment 23, FHIS Reset and Restoration. This is a bank JPM under the Area Radiation Monitoring System -
Instrumentation safety function.
Instrumentation safety function.
C-8 The candidate will place the Containment Mini-Purge System in operation to support a Containment entry per SO23-1-4.2, Containment Purge and Recirculation Filtration System. The alternate path occurs when a Containment Radiation High alarm is received and the operator isolates mini-purge per the alarm response. This is a bank JPM under the Containment Purge System - Plant Service Systems safety function.
P-1 The candidate will perform the local actions to operate a Main Feedwater Regulating Valve per SO23-9-6, Feedwater Control System Operation, Section 6.4, Local-Manual Operation of Main Feedwater Control Valves. This is a bank JPM under the Main Feedwater System - Secondary System Heat Removal from Reactor Core safety function.
P-2 The candidate will perform the actions to align Charging Pump suction to the Refueling Water Storage Tank per SO23-13-2, Shutdown from Outside the Control Room, Attachments 10 and 11. This is a new JPM under the Chemical and Volume Control System - Reactor Coolant System Inventory Control safety function. This is a PRA significant action.
P-3 The candidate will log into and enter the Radiation Controlled Area and locally open Reactor Trip breakers per SO23-12-1, Standard Post Trip Actions. This is a time critical, modified bank JPM under the Reactor Protection System -
Instrumentation safety function. This is a PRA significant action.
NUREG-1021, Revision 9.1                3 of 3        SONGS Oct 2009 NRC ES-301-2 Rev 1


C-8 The candidate will place the Containm ent Mini-Purge System in operation to support a Containment entry per SO 23-1-4.2, Containment Purge and Recirculation Filtration System. The al ternate path occurs when a Containment Radiation High alarm is received and the operator isolates mini-purge per the alarm response. This is a bank JPM under the Containment Purge System - Plant Service Systems safety function.
Appendix C                                   JPM WORKSHEET                                  Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC C-7                Task #186190      K/A #073.A4.02      3.7 / 3.7    SF-7
 
P-1 The candidate will perform the local actions to operate a Main Feedwater Regulating Valve per SO23-9-6, Feedwater Control Syst em Operation, Section 6.4, Local-Manual Operation of Main Feedwater Control Valves
. This is a bank JPM under the Main Feedwater System -
Secondary System Heat Removal from Reactor Core safety function. 


P-2 The candidate will perform the actions to align Charging Pump suction to the Refueling Water Storage Tank per SO23 2, Shutdown from Outside the Control
==Title:==
 
Reset and Restoration of Fuel Handling Isolation System Examinee (Print):
Room, Attachments 10 and 11. This is a new JPM under the Chemical and
 
Volume Control System - Reactor Cool ant System Inventory Control safety function. This is a PRA significant action.
 
P-3 The candidate will log into and enter the Radiation Controlled Area and locally open Reactor Trip breakers per SO23-12-1, Standard Post Trip Actions. This is a time critical, modified bank JPM under the Reactor Protection System -
Instrumentation safety function. Th is is a PRA significant action.
Appendix C JPM WORKSHEET Form ES-C-1 Page 1 of 9  SONGS Oct 2009 NRC JPM C-7 Rev 0.doc Facility: SONGS JPM # RO/SRO NRC C-7 Task #186190 K/A #073.A4.02  3.7 / 3.7  SF-7Title: Reset and Restoration of Fuel Handling Isolation System Examinee (Print):
Testing Method:
Testing Method:
Simulated Performance:   X Classroom:   Actual Performance:   Simulator:
Simulated Performance:           X                           Classroom:
Plant:   X READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue. When you complete the task successfully, the objective for this JPM will be satisfied.
Actual Performance:                                           Simulator:
Initial Conditions: Given the following conditions: An actuation of Unit 2 (Unit 3)
Plant:         X READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.
Train A Fuel Handling Isolation System (FHIS) has occurred due to radiography in the area. Radiography has been stopped. Proper actuation of Unit 2 (Unit 3) Train A FHIS has been verified. The actuation occurred less than 15 minutes ago and SO23-1-3.1, Emergency Chilled Water System O peration, Section for Prevention of Low Load Recycle was not performed.
When you complete the task successfully, the objective for this JPM will be satisfied.
Initiating Cue: The Control Room Supervisor directs you to RESTORE the Unit 2 (Unit 3)
Initial Conditions:     Given the following conditions:
Train A Fuel Handling Isolation S ystem per SO23-3-2.22, Engineered Safety Features Actuation System Op eration, Attachment 23, FHIS Reset and Restoration.
* An actuation of Unit 2 (Unit 3) Train A Fuel Handling Isolation System (FHIS) has occurred due to radiography in the area.
Task Standard: Locate and correctly perform Critical Steps of SO23-3-2.22.  
* Radiography has been stopped.
 
* Proper actuation of Unit 2 (Unit 3) Train A FHIS has been verified.
* The actuation occurred less than 15 minutes ago and SO23-1-3.1, Emergency Chilled Water System Operation, Section for Prevention of Low Load Recycle was not performed.
Initiating Cue:         The Control Room Supervisor directs you to RESTORE the Unit 2 (Unit 3)
Train A Fuel Handling Isolation System per SO23-3-2.22, Engineered Safety Features Actuation System Operation, Attachment 23, FHIS Reset and Restoration.
Task Standard:           Locate and correctly perform Critical Steps of SO23-3-2.22.
Required Materials: SO23-3-2.22, Engineered Safety Features Actuation System Operation, Rev. 17.
Required Materials: SO23-3-2.22, Engineered Safety Features Actuation System Operation, Rev. 17.
Validation Time: 19 minutes Time Critical: N/A Completion Time: ________ minutes  
Validation Time:         19 minutes     Time Critical: N/A     Completion Time:   ________ minutes Comments:
Result:  SAT            UNSAT Examiner (Print / Sign):                                                          Date:
Page 1 of 9                        SONGS Oct 2009 NRC JPM C-7 Rev 0.doc


Comments:  Result:  SAT  UNSAT  Examiner (Print / Sign):  Date:
Appendix C                           JPM WORKSHEET                       Form ES-C-1 CONTROL ROOM SETUP EXAMINER:
Appendix C JPM WORKSHEET Form ES-C-1 Page 2 of 9 SONGS Oct 2009 NRC JPM C-7 Rev 0.doc CONTROL ROOM SETUP
PROVIDE the examinee with a copy of:
* SO23-3-2.22, Engineered Safety Features Actuation Systems Operation, Attachment 23, FHIS Reset and Restoration.
* INITIAL through Step 2.1.
EXAMINER NOTE:
This JPM can be performed on either Unit. CIRCLE the Unit on which the JPM is to be performed on the JPM Worksheet and the JPM Cue Sheet.
Panel 2(3)L-103 is located in the Control Room Hallway and Panel 2(3)L-154 is located in the Control Room Hallway past the Fire Door.
Page 2 of 9               SONGS Oct 2009 NRC JPM C-7 Rev 0.doc


EXAMINER: PROVIDE the examinee with a copy ofSO23-3-2.22, Engineered Safety Features Actuation Systems Operation, Attachment 23, FHIS Reset and Restoration. INITIAL through Step 2.1.  
Appendix C                            JPM STEPS                          Form ES-C-1
- Check Mark Denotes Critical Step                    START TIME:
Examiner Cue:      Remind the examinee to simulate all actions.
Perform Step: 1  MOMENTARILY DEPRESS RESET/TEST handswitch HS-7822H1 and/or HS-7823H2, as applicable to reset FHIS.
Standard:          DEPRESS 2(3)HS-7822H1 FHIS TR A RESET/TEST handswitch.
Comment:                                                           SAT UNSAT Perform Step: 2    Verify handswitch backlight illuminates (L-103).
Standard:          OBSERVE 2(3)HS-7822H1 FHIS TR A RESET/TEST white light illuminated.
Examiner Cue:      The RESET/TEST light is illuminated.
Comment:                                                            SAT  UNSAT Perform Step: 3    VERIFY 60A22, FHIS ACTUATION, has reset.
Standard:          GO to Annunciator Panel 60A and OBSERVE annunciator 60A22 - FHIS ACTUATION is extinguished.
Examiner Cue:      Annunciator window 60A22 is extinguished.
Comment:                                                            SAT  UNSAT Perform Step: 4  PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:
* E-370 FHB Post-Accident Cleanup Unit - STOP.
Standard:          DEPRESS 2(3)HS-9850-1, FHB Post ACDT Cleanup Unit 2(3)E370 STOP pushbutton and OBSERVE green STOP light illuminated.
Examiner Cue:      The stop light is illuminated.
Comment:                                                            SAT  UNSAT Page 3 of 9              SONGS Oct 2009 NRC JPM C-7 Rev 0.doc


EXAMINER NOTE
Appendix C                          JPM STEPS                            Form ES-C-1 Perform Step: 5 PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:
This JPM can be performed on either Unit. CIRCLE the Unit on which the JPM is to be performed on the JPM Worksheet and the JPM Cue Sheet.
* HV-9850 FHB PACU E-370 Isolation Damper [1] - CLOSED Standard:        OBSERVE 2(3)HV-9850, FHB Post ACDT Cleanup Unit 2(3)E370 Isolation Damper green CLOSE light illuminated and red OPEN light extinguished.
Panel 2(3)L-103 is located in the Control Room Hallway and Panel 2(3)L-154 is located in the Control Room Hallway past the Fire Door.  
Examiner Cue:    The damper is closed.
Comment:                                                      SAT      UNSAT Examiner Note:  Heaters operate automatically with the associated cleanup unit.
Perform Step: 6  PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:
* E-464, FHB PACU E-370 Heaters ZL-9865 - OFF Standard:        VERIFY 2(3)E464, FHB Post ACDT Cleanup Unit 2(3)370 Heater is OFF and OBSERVE green OFF light illuminated on 2(3)ZL-9865.
Examiner Cue:    The heater is off.
Comment:                                                      SAT      UNSAT Perform Step: 7  PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:
* E-652, FHB PACU E-370 Heaters ZL-9865B1 - OFF Standard:        VERIFY 2(3)E652, FHB Post ACDT Cleanup Unit 2(3)E370 Heater is OFF by OBSERVE green OFF light illuminated on 2(3)ZL-9865B1.
Examiner Cue:    The heater is off.
Comment:                                                      SAT      UNSAT Perform Step: 8 PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:
* HV-9846 FHB Train A Air Supply Isol Damper - OPEN Standard:        DEPRESS 2(3)HV-9846, FHB Air Supply ISO Damper OPEN pushbutton and OBSERVE red OPEN light illuminated and green CLOSE light extinguished.
Examiner Cue:    The damper is open.
Comment:                                                      SAT      UNSAT Page 4 of 9            SONGS Oct 2009 NRC JPM C-7 Rev 0.doc


Appendix C JPM STEPS Form ES-C-1 Page 3 of SONGS Oct 2009 NRC JPM C-7 Rev 0.doc  - Check Mark Denotes Critical Step START TIME:
Appendix C                           JPM STEPS                           Form ES-C-1 Perform Step: PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:
Examiner Cue: Remind the examinee to simulate all actions.
* HV-9847 FHB Train A Air Exhaust Isol Damper - OPEN Standard:         DEPRESS 2(3)HV-9847, FHB Air Exhaust ISO Damper OPEN pushbutton and OBSERVE red OPEN light illuminated and green CLOSE light extinguished.
Perform Step: 1 MOMENTARILY DEPRESS RESET/TEST handswitch HS-7822H1 and/or HS-7823H2, as applicable to reset FHIS.
Examiner Cue:     The damper is open.
Standard:
Comment:                                                      SAT      UNSAT Perform Step: 10 PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:
DEPRESS 2(3)HS-7822H1 FHIS TR A RESET/TEST handswitch.
* HV-9847B FHB Train A Air Exhaust Isol Damper - OPEN Standard:         DEPRESS 2(3)HV-9847B, FHB Air Exhaust ISO Damper OPEN pushbutton and OBSERVE red OPEN light illuminated and green CLOSE light extinguished.
Comment: SAT      UNSAT     Perform Step: 2  Verify handswitch backlight illuminates (L-103).
Examiner Cue:    The damper is open.
Standard: OBSERVE 2(3)HS-7822H1 FHIS TR A RESET/TEST white light illuminated. Examiner Cue: The RESET/TEST light is illuminated.
Comment:                                                       SAT      UNSAT Perform Step: 11 PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:
Comment: SAT      UNSAT     Perform Step: 3 VERIFY 60A22, FHIS ACTUATION, has reset.
* HV-9847C FHB Train A Air Exhaust Isol Damper - OPEN Standard:         DEPRESS 2(3)HV-9847C, FHB Air Exhaust ISO Damper OPEN pushbutton and OBSERVE red OPEN light illuminated and green CLOSE light extinguished.
Standard: GO to Annunciator Panel 60A and OBSERVE annunciator 60A22 - FHIS
Examiner Cue:     The damper is open.
Comment:                                                       SAT      UNSAT Perform Step: 12 PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:
* E-441 FHB Pump Room Cooling Unit STOP Standard:         DEPRESS 2(3)HS-9836-1, FHB Pump Room CLG Unit 2(3)E441 STOP pushbutton and OBSERVE green STOP light illuminated.
Examiner Cue:    The cooling unit is off.
Comment:                                                      SAT      UNSAT Page 5 of 9            SONGS Oct 2009 NRC JPM C-7 Rev 0.doc


ACTUATION is extinguished. Examiner Cue: Annunciator window 60A22 is extinguished.
Appendix C                           JPM STEPS                             Form ES-C-1 Perform Step: 13 RESTORE Train A loads that were placed in service by SO23-1-3.1, Section for Prevention of Low Load Recycle.
Comment: SAT      UNSAT      Perform Step: 4 PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:  E-370 FHB Post-Accident Cleanup Unit - STOP.
Standard:         DETERMINE that Train A load restoration is NOT required based on the Initial Conditions.
Standard:
Examiner Cue:     Train A load restoration is NOT required.
DEPRESS 2(3)HS-9850-1, FHB Post ACDT Cleanup Unit 2(3)E370 STOP pushbutton and OBSERVE green STOP light illuminated. Examiner Cue: The stop light is illuminated.
Comment:                                                         SAT       UNSAT Examiner Cue:     Chiller is NOT required for plant operation.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 4 of 9  SONGS Oct 2009 NRC JPM C-7 Rev 0.doc Perform Step: 5  PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:  HV-9850 FHB PACU E-370 Isolat ion Damper [1] - CLOSED Standard: OBSERVE 2(3)HV-9850, FHB Post ACDT Cleanup Unit 2(3)E370 Isolation Damper green CLOSE light illuminated and red OPEN light extinguished. Examiner Cue: The damper is closed.
Perform Step: 14 PERFORM the following alignment to continue restoration of FHIS Train A components to normal on CR-60:
Comment: SAT      UNSAT      Examiner Note: Heaters operate automatically with the associated cleanup unit.
* E-336 Control Building Emergency Chiller [2] - STOP Standard:         DEPRESS 2/3HS-9875-1 or 2/3HS-9875C1, 2/3E336 EMER CHLD Water Chiller STOP pushbutton and OBSERVE green STOP light illuminated.
Perform Step: 6  PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:  E-464, FHB PACU E-370 Heaters ZL-9865 - OFF Standard: VERIFY 2(3)E464, FHB Post ACDT Cleanup Unit 2(3)370 Heater is OFF and OBSERVE green OFF light illuminated on 2(3)ZL-9865. Examiner Cue: The heater is off.
Examiner Cue:     The chiller is off.
Comment: SAT      UNSAT      Perform Step: 7  PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:  E-652, FHB PACU E-370 Heaters ZL-9865B1 - OFF Standard: VERIFY 2(3)E652, FHB Post ACDT Cle anup Unit 2(3)E370 Heater is OFF by OBSERVE green OFF light illuminated on 2(3)ZL-9865B1. Examiner Cue: The heater is off.
Comment:                                                         SAT       UNSAT Perform Step: 15 PERFORM the following alignment to continue restoration of FHIS Train A components to normal on CR-60:
Comment: SAT      UNSAT        Perform Step: 8 PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:  HV-9846 FHB Train A Air Supply Isol Damper - OPEN Standard:
* P-162 E-336 Chilled Water Pump [2] - STOP Standard:         DEPRESS 2/3HS-9872-1, 2/3P162 EMER CHLD Water Pump STOP pushbutton and OBSERVE green STOP light illuminated.
DEPRESS 2(3)HV-9846, FHB Ai r Supply ISO Damper OPEN pushbutton and OBSERVE red OPEN light illuminated and green CLOSE light extinguished. Examiner Cue: The damper is open.
Examiner Cue:     The pump is off.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 5 of 9  SONGS Oct 2009 NRC JPM C-7 Rev 0.doc Perform Step: 9 PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:  HV-9847 FHB Train A Air Exhaust Isol Damper - OPEN Standard: DEPRESS 2(3)HV-9847, FHB Air Exhaust ISO Damper OPEN pushbutton and OBSERVE red OPEN light illuminated and green CLOSE light extinguished. Examiner Cue: The damper is open.
Comment:                                                         SAT       UNSAT Perform Step: 16 PERFORM the following alignment to continue restoration of FHIS Train A components to normal on CR-60:
Comment: SAT      UNSAT      Perform Step: 10 PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:  HV-9847B FHB Train A Air Exhaust Isol Damper - OPEN Standard:
* A-053 Emerg. Chiller Rm A Vent (Supply) [2] - STOP Standard:         DEPRESS 2/3HS-9774-1, EMER Chiller Room A Vent Supply Unit 2/3A053 STOP pushbutton and OBSERVE green STOP light illuminated.
DEPRESS 2(3)HV-9847B, FHB Air Exhaust ISO Damper OPEN pushbutton and OBSERVE red OPEN light illuminated and green CLOSE light extinguished. Examiner Cue: The damper is open.
Examiner Cue:     The supply unit is off.
Comment: SAT      UNSAT      Perform Step: 11 PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:  HV-9847C FHB Train A Air Exhaust Isol Damper - OPEN Standard:
Comment:                                                         SAT       UNSAT Page 6 of 9             SONGS Oct 2009 NRC JPM C-7 Rev 0.doc
DEPRESS 2(3)HV-9847C, FHB Air Exhaust ISO Damper OPEN pushbutton and OBSERVE red OPEN light illuminated and green CLOSE light extinguished. Examiner Cue: The damper is open.
Comment: SAT      UNSAT      Perform Step: 12 PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:  E-441 FHB Pump Room Cooling Unit STOP Standard:
DEPRESS 2(3)HS-9836-1, FHB Pump Room CLG Unit 2(3)E441 STOP pushbutton and OBSERVE green STOP light illuminated. Examiner Cue: The cooling unit is off.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 6 of 9 SONGS Oct 2009 NRC JPM C-7 Rev 0.doc Perform Step: 13 RESTORE Train A loads that were placed in service by SO23-1-3.1, Section for Prevention of Low Load Recycle.
Standard:
DETERMINE that Train A load restoration is NOT required based on the Initial Conditions. Examiner Cue: Train A load restoration is NOT required.
Comment: SAT     UNSAT     Examiner Cue: Chiller is NOT required for plant operation.
Perform Step: 14 PERFORM the following alignment to continue restoration of FHIS Train A components to normal on CR-60: E-336 Control Building Emergency Chiller [2] - STOP Standard: DEPRESS 2/3HS-9875-1 or 2/3HS-9875C1, 2/3E336 EMER CHLD Water Chiller STOP pushbutton and OBSERVE green STOP light illuminated. Examiner Cue: The chiller is off.
Comment: SAT     UNSAT     Perform Step: 15 PERFORM the following alignment to continue restoration of FHIS Train A components to normal on CR-60: P-162 E-336 Chilled Water Pump [2] - STOP Standard:
DEPRESS 2/3HS-9872-1, 2/3P162 EMER CHLD Water Pump STOP pushbutton and OBSERVE green STOP light illuminated. Examiner Cue: The pump is off.
Comment: SAT     UNSAT     Perform Step: 16 PERFORM the following alignment to continue restoration of FHIS Train A components to normal on CR-60: A-053 Emerg. Chiller Rm A Vent (Supply) [2] - STOP Standard:
DEPRESS 2/3HS-9774-1, EMER Chiller Room A Vent Supply Unit 2/3A053 STOP pushbutton and OBSERVE green STOP light illuminated. Examiner Cue: The supply unit is off.
Comment: SAT     UNSAT Appendix C JPM STEPS Form ES-C-1 Page 7 of 9 SONGS Oct 2009 NRC JPM C-7 Rev 0.doc Perform Step: 17 PERFORM the following alignment to continue restoration of FHIS Train A components to normal on CR-60:  A-056 Emerg. Chiller Rm A Vent (Exhaust) [2] - STOP Standard:
DEPRESS 2/3HS-9775-1, EMER Chil ler Room A Vent Exhaust Unit 2/3A056 STOP pushbutton and OBSERVE green STOP light illuminated. Examiner Cue: The supply unit is off.
Comment: SAT      UNSAT      Examiner Note: The examinee may start either supply and exhaust fans and the actions would be reversed. The fans are electrically interlocked so that no more than one of each may run.
Perform Step: 18  At HVAC Panel L-154 ENSURE the following alignment:  A-359 FHB Ventilation Normal Supply Fan [3] - STOP/START Standard: TURN 2(3)HS-9830A, FHB Ventilation Normal Supply Fan 2(3)A359 START switch and OBSERVE red START light illuminated and CIRCLE


START. Examiner Cue: The fan is running.
Appendix C                          JPM STEPS                            Form ES-C-1 Perform Step: 17 PERFORM the following alignment to continue restoration of FHIS Train A components to normal on CR-60:
Comment: SAT     UNSAT     Perform Step: 19 At HVAC Panel L-154 ENSURE the following alignment: A-360 FHB Ventilation Standby Supply Fan [3] - STOP/START Standard: DETERMINE only one supply fan is required and OBSERVE  
* A-056 Emerg. Chiller Rm A Vent (Exhaust) [2] - STOP Standard:        DEPRESS 2/3HS-9775-1, EMER Chiller Room A Vent Exhaust Unit 2/3A056 STOP pushbutton and OBSERVE green STOP light illuminated.
Examiner Cue:    The supply unit is off.
Comment:                                                      SAT        UNSAT Examiner Note:    The examinee may start either supply and exhaust fans and the actions would be reversed. The fans are electrically interlocked so that no more than one of each may run.
Perform Step: 18 At HVAC Panel L-154 ENSURE the following alignment:
* A-359 FHB Ventilation Normal Supply Fan [3] - STOP/START Standard:        TURN 2(3)HS-9830A, FHB Ventilation Normal Supply Fan 2(3)A359 START switch and OBSERVE red START light illuminated and CIRCLE START.
Examiner Cue:     The fan is running.
Comment:                                                       SAT       UNSAT Perform Step: 19 At HVAC Panel L-154 ENSURE the following alignment:
* A-360 FHB Ventilation Standby Supply Fan [3] - STOP/START Standard:         DETERMINE only one supply fan is required and OBSERVE 2(3)HS-9830B, FHB Ventilation Standby Supply Fan 2(3)A-360 green STOP light illuminated and CIRCLE STOP.
Examiner Cue:    The fan is off.
Comment:                                                      SAT        UNSAT Perform Step: 20 At HVAC Panel L-154 ENSURE the following alignment:
* A-316 FHB Ventilation Standby Exhaust Fan [3] - STOP/START Standard:        DETERMINE only one exhaust fan is required and OBSERVE 2(3)HS-9848, FHB Ventilation Standby Exhaust Fan 2(3)A316 green STOP light illuminated and CIRCLE STOP.
Examiner Cue:    The fan is off.
Comment:                                                      SAT        UNSAT Page 7 of 9            SONGS Oct 2009 NRC JPM C-7 Rev 0.doc


2(3)HS-9830B, FHB Ventilation St andby Supply Fan 2(3)A-360 green STOP light illumi nated and CIRCLE STOP. Examiner Cue: The fan is off.
Appendix C                          JPM STEPS                          Form ES-C-1 Perform Step: 21 At HVAC Panel L-154 ENSURE the following alignment:
Comment: SAT     UNSAT     Perform Step: 20  At HVAC Panel L-154 ENSURE the following alignment: A-316 FHB Ventilation Standby Exhaust Fan [3] - STOP/START Standard: DETERMINE only one exhaust fan is required and OBSERVE 
* A-317 FHB Ventilation Normal Exhaust Fan [3] - STOP/START Standard:        TURN OBSERVE 2(3)HS-9849, FHB Ventilation Normal Exhaust Fan 2(3)A317 START switch and OBSERVE red START light illuminated and CIRCLE START.
Examiner Cue:   The fan is running.
Comment:                                                     SAT       UNSAT Perform Step: 22 At HVAC Panel L-154 ENSURE the following alignment:
* E-464 FHB PACU E-370 Heaters HS-9865 AUTO Standard:        VERIFY 2(3)HS-9865-1, FHB CLEANUP 2(3)E370 INLET HEATER 2(3)E464 is selected to AUTO.
Examiner Cue:    HS-9865-1 is in AUTO.
Comment:                                                    SAT      UNSAT Perform Step: 23 At HVAC Panel L-154 ENSURE the following alignment:
* E-652 FHB PACU E-370 Heaters HS-9865B1 - AUTO Standard:        VERIFY 2(3)HS-9865B1, FHB CLEANUP 2(3)E370 INLET HEATER 2(3)E652 selected to AUTO.
Examiner Cue:    HS-9865B1 is in AUTO.
Comment:                                                    SAT      UNSAT Perform Step: 24 At HVAC Panel L-154 ENSURE the following alignment:
* E-465 FHB PACU E-371 Heaters HS-9866 AUTO Standard:       VERIFY 2(3)HS-9866-2, FHB CLEANUP 2(3)E371 INLET HEATER 2(3)E465 selected to AUTO.
Terminating Cue: HS-9866-2 is in AUTO. This JPM is complete.
Comment:                                                    SAT      UNSAT STOP TIME:
Page 8 of 9          SONGS Oct 2009 NRC JPM C-7 Rev 0.doc


2(3)HS-9848, FHB Ventilation Stan dby Exhaust Fan 2(3)A316 green STOP light illumi nated and CIRCLE STOP. Examiner Cue: The fan is off.
Appendix C                      JPM CUE SHEET                          Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 8 of 9 SONGS Oct 2009 NRC JPM C-7 Rev 0.doc Perform Step: 21 At HVAC Panel L-154 ENSURE the following alignment:  A-317 FHB Ventilation Normal Exhaust Fan [3] - STOP/START Standard: TURN OBSERVE 2(3)HS-9849, FHB Ventilation Normal Exhaust Fan 2(3)A317 START switch and OBSERVE red START light illuminated
* An actuation of Unit 2 (Unit 3) Train A Fuel Handling Isolation System (FHIS) has occurred due to radiography in the area.
* Radiography has been stopped.
* Proper actuation of Unit 2 (Unit 3) Train A FHIS has been verified.
* The actuation occurred less than 15 minutes ago and SO23-1-3.1, Emergency Chilled Water System Operation, Section for Prevention of Low Load Recycle was not performed.
INITIATING CUE:     The Control Room Supervisor directs you to RESTORE the Unit 2 (Unit 3) Train A Fuel Handling Isolation System per SO23-3-2.22, Engineered Safety Features Actuation System Operation, Attachment 23, FHIS Reset and Restoration.
Page 9 of 9         SONGS Oct 2009 NRC JPM C-7 Rev 0.doc


and CIRCLE START. Examiner Cue: The fan is running.
Appendix C                                    JPM WORKSHEET                                  Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC C-8                Task #193205      K/A #029 A3.01      3.8/4.0    SF-8
Comment: SAT      UNSAT      Perform Step: 22 At HVAC Panel L-154 ENSURE the following alignment:  E-464 FHB PACU E-370 Heaters HS-9865 AUTO Standard: VERIFY 2(3)HS-9865-1, FHB CLEANUP 2(3)E370 INLET HEATER 2(3)E464 is selected to AUTO. Examiner Cue: HS-9865-1 is in AUTO.
Comment: SAT      UNSAT      Perform Step: 23 At HVAC Panel L-154 ENSURE the following alignment:  E-652 FHB PACU E-370 Heaters HS-9865B1  - AUTO Standard: VERIFY 2(3)HS-9865B1, FHB CLEANUP 2(3)E370 INLET HEATER 2(3)E652 selected to AUTO. Examiner Cue: HS-9865B1 is in AUTO.
Comment: SAT      UNSAT      Perform Step: 24 At HVAC Panel L-154 ENSURE the following alignment:  E-465 FHB PACU E-371 Heaters HS-9866-2  - AUTO Standard: VERIFY 2(3)HS-9866-2, FHB CLEANUP 2(3)E371 INLET HEATER


2(3)E465 selected to AUTO. Terminating Cue: HS-9866-2 is in AUTO. This JPM is complete.
==Title:==
Comment: SAT      UNSAT      STOP TIME:
Place Containment Mini-Purge in Service Examinee (Print):
Appendix C JPM CUE SHEET Form ES-C-1 Page 9 of 9  SONGS Oct 2009 NRC JPM C-7 Rev 0.doc INITIAL CONDITIONS: Given the following conditions:  An actuation of Unit 2 (Uni t 3) Train A Fuel Handling Isolation System (FHIS) has occurred due to radiography in the area. Radiography has been stopped. Proper actuation of Unit 2 (Unit 3) Train A FHIS has been verified. The actuation occurred less than 15 minutes ago and SO23-1-3.1, Emergency Chilled Water System
 
Operation, Section for Prevention of Low Load Recycle was not performed.
 
INITIATING CUE: The Control Room Supervisor directs you to RESTORE the Unit 2 (Unit 3) Train A Fuel Handling Isolation System per SO23-3-2.22, Engineered Safety Features Actuation System Operation, Attachment 23, FHIS Reset and Restoration.
 
Appendix C JPM WORKSHEET Form ES-C-1 Page 1 of 8 SONGS Oct 2009 NRC JPM C-8 Rev 0.doc        Facility: SONGS JPM # RO/SRO NRC C-8 Task #193205  K/A #029 A3.01    3.8/4.0    SF-8Title: Place Containment Mini-Purge in Service Examinee (Print):
Testing Method:
Testing Method:
Simulated Performance:   X Classroom:   Actual Performance:   Simulator:
Simulated Performance:         X                             Classroom:
Plant:   X READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue. When you complete the task successfully, the objective for this JPM will be satisfied.
Actual Performance:                                           Simulator:
Initial Conditions: Given the following conditions: Unit 2 (Unit 3) is operating at full power. A Containment entry must be made to investigate an abnormal noise in a Reactor Coolant Pump. Prior to the entry, a Containment Mi ni-Purge is to be performed.
Plant:         X READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.
2(3)RT-7828, Containm ent Purge Stack Radiation Monitor is out-of-service. Initiating Cue: The Control Room Supervisor di rects you to INITIATE a Unit 2 (Unit 3)
When you complete the task successfully, the objective for this JPM will be satisfied.
Containment Mini-Purge per SO23-1-4.2, Containment Purge and Recirculation Filtration System. Attachment 6, Operation of the Containment Mini-Purge System has been completed through Step 2.4.3. 2(3)RT-7865, Plant Vent Stack/Containment Purge Stack Wide Range Gas Monitor is aligned to the Containment Purge Stack.
Initial Conditions:     Given the following conditions:
Task Standard: Locate and correctly perform Critical Steps of SO23-1-4.2 and 57C10.
* Unit 2 (Unit 3) is operating at full power.
Required Materials: SO23-1-4.2, Containment Purge and Recirculation Filtration System, Rev. 28. SO23-15-57.C, 57C10 - CONTAINMENT RADIATION HI, Rev. 18.
* A Containment entry must be made to investigate an abnormal noise in a Reactor Coolant Pump.
Validation Time: 13 minutes Time Critical: N/A Completion Time: ________ minutes Comments:   Result: SAT UNSAT Appendix C JPM WORKSHEET Form ES-C-1 Page 2 of 8 SONGS Oct 2009 NRC JPM C-8 Rev 0.doc       Examiner (Print / Sign):  Date:  CONTROL ROOM SETUP
* Prior to the entry, a Containment Mini-Purge is to be performed.
* 2(3)RT-7828, Containment Purge Stack Radiation Monitor is out-of-service.
Initiating Cue:         The Control Room Supervisor directs you to INITIATE a Unit 2 (Unit 3)
Containment Mini-Purge per SO23-1-4.2, Containment Purge and Recirculation Filtration System.
* Attachment 6, Operation of the Containment Mini-Purge System has been completed through Step 2.4.3.
* 2(3)RT-7865, Plant Vent Stack/Containment Purge Stack Wide Range Gas Monitor is aligned to the Containment Purge Stack.
Task Standard:           Locate and correctly perform Critical Steps of SO23-1-4.2 and 57C10.
Required Materials: SO23-1-4.2, Containment Purge and Recirculation Filtration System, Rev. 28.
SO23-15-57.C, 57C10 - CONTAINMENT RADIATION HI, Rev. 18.
Validation Time:         13 minutes     Time Critical: N/A   Completion Time:   ________ minutes Comments:
Result:   SAT             UNSAT Page 1 of 8                       SONGS Oct 2009 NRC JPM C-8 Rev 0.doc


EXAMINER: PROVIDE the examinee with a copy of: SO23-1-4.2, Containment Purge and Recirculation Filtration System, Attachment 6. INITIAL through Step 2.4.3. This will make Section 2.5, Start Mini-Purge, as the next step to be performed.
Appendix C                          JPM WORKSHEET                        Form ES-C-1 Examiner (Print / Sign):                                          Date:
EXAMINER NOTE
CONTROL ROOM SETUP EXAMINER:
: This JPM can be performed on either Unit. CIRCLE the Unit on which the JPM is to be performed on the JPM Worksheet and the JPM Cue Sheet.  
PROVIDE the examinee with a copy of:
* SO23-1-4.2, Containment Purge and Recirculation Filtration System, Attachment 6.
* INITIAL through Step 2.4.3. This will make Section 2.5, Start Mini-Purge, as the next step to be performed.
EXAMINER NOTE:
This JPM can be performed on either Unit. CIRCLE the Unit on which the JPM is to be performed on the JPM Worksheet and the JPM Cue Sheet.
Page 2 of 8                SONGS Oct 2009 NRC JPM C-8 Rev 0.doc


Appendix C JPM STEPS Form ES-C-1 Page 3 of 8 SONGS Oct 2009 NRC JPM C-8 Rev 0.doc        - Check Mark Denotes Critical Step START TIME:
Appendix C                             JPM STEPS                       Form ES-C-1
Examiner Note: Normally to prevent RT-7828/RT-7865-1 from tripping on low sample flow, Steps 2.5.1 through 2.5.5 must be completed within 60 seconds of the Monitor Process Flow reaching a value of < 900 SCFM and normally two operators are required. Examiner Cue: Remind the examinee to simu late all actions. The examiner will act as Chemistry.
- Check Mark Denotes Critical Step                     START TIME:
Perform Step: 1 ENSURE OPEN HV-9825, Cont ainment Mini-Purge Exhaust 2(3)MA-059 Isolation Valv e (Outside Containment).
Examiner Note:     Normally to prevent RT-7828/RT-7865-1 from tripping on low sample flow, Steps 2.5.1 through 2.5.5 must be completed within 60 seconds of the Monitor Process Flow reaching a value of < 900 SCFM and normally two operators are required.
Standard:
Examiner Cue:     Remind the examinee to simulate all actions. The examiner will act as Chemistry.
DEPRESS 2(3)HV-9825, CNTMT MI NI PRG EXH 2(3)A059 ISO VALVE red OPEN pushbutton and OBSERVE red OPEN light illuminated and  
Perform Step: 1   ENSURE OPEN HV-9825, Containment Mini-Purge Exhaust 2(3)MA-059 Isolation Valve (Outside Containment).
Standard:         DEPRESS 2(3)HV-9825, CNTMT MINI PRG EXH 2(3)A059 ISO VALVE red OPEN pushbutton and OBSERVE red OPEN light illuminated and green CLOSE light extinguished.
Examiner Cue:      HV-9825 is open.
Comment:                                                        SAT  UNSAT Perform Step: 2  ENSURE OPEN HV-9824, Containment Mini-Purge Exhaust 2(3)MA-059 Isolation Valve (Inside Containment).
Standard:          DEPRESS 2(3)HV-9824, CNTMT MINI PRG EXH 2(3)A059 ISO VALVE red OPEN pushbutton and OBSERVE red OPEN light illuminated and green CLOSE light is extinguished.
Examiner Cue:      HV-9824 is open.
Comment:                                                        SAT  UNSAT Perform Step: 3  ENSURE OPEN HV-9823, Containment Mini-Purge Supply 2(3)MA-379 Isolation Valve. (Inside Containment)
Standard:          DEPRESS 2(3)HV-9823, CNTMT MINI PRG SPLY 2(3)A379 ISO VALVE OPEN pushbutton and OBSERVE red OPEN light illuminated and green CLOSE light extinguished.
Examiner Cue:      HV-9823 is open.
Comment:                                                        SAT  UNSAT Page 3 of 8              SONGS Oct 2009 NRC JPM C-8 Rev 0.doc


green CLOSE light extinguished. Examiner Cue: HV-9825 is open.
Appendix C                           JPM STEPS                             Form ES-C-1 Perform Step: 4 ENSURE OPEN HV-9821, Containment Mini-Purge Supply 2(3)MA-379 Isolation Valve (Outside Containment).
Comment: SAT      UNSAT      Perform Step: 2 ENSURE OPEN HV-9824, Cont ainment Mini-Purge Exhaust 2(3)MA-059 Isolation Valv e (Inside Containment).
Standard:       DEPRESS 2(3)HV-9821, CNTMT MINI PRG SPLY 2(3)A379 ISO VALVE OPEN pushbutton and OBSERVE red OPEN lamp illuminated and green CLOSE light extinguished.
Standard:
Examiner Cue:   HV-9821 is open.
DEPRESS 2(3)HV-9824, CNTMT MI NI PRG EXH 2(3)A059 ISO VALVE red OPEN pushbutton and OBSERVE red OPEN light illuminated and green CLOSE light is extinguished. Examiner Cue: HV-9824 is open.
Comment:                                                         SAT      UNSAT Examiner Note:   Fan controls are at Panel 2(3)L-155 in the Control Room hallway.
Comment: SAT      UNSAT      Perform Step: 3 ENSURE OPEN HV-9823, Containm ent Mini-Purge Supply 2(3)MA-379 Isolation Valve. (Inside Containment)
Standard:
DEPRESS 2(3)HV-9823, CNTMT MINI PRG SPLY 2(3)A379 ISO VALVE OPEN pushbutton and OBSERVE red OPEN light illuminated and green CLOSE light extinguished. Examiner Cue: HV-9823 is open.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 4 of 8 SONGS Oct 2009 NRC JPM C-8 Rev 0.doc Perform Step: 4 ENSURE OPEN HV-9821, Containm ent Mini-Purge Supply 2(3)MA-379 Isolation Valve (Outside Containment).
Standard:
DEPRESS 2(3)HV-9821, CNTMT MINI PRG SPLY 2(3)A379 ISO VALVE OPEN pushbutton and OBSERVE red OPEN lamp illuminated and green CLOSE light extinguished. Examiner Cue: HV-9821 is open.
Comment: SAT      UNSAT     Examiner Note: Fan controls are at Panel 2(3)L-155 in the Control Room hallway.
Perform Step: 5 START 2(3)MA-059, Mini-Purge Exhaust Unit, by Positioning 2(3)HS-9804 to START.
Perform Step: 5 START 2(3)MA-059, Mini-Purge Exhaust Unit, by Positioning 2(3)HS-9804 to START.
Standard: TURN 2(3)HS-9804, Cont Mini-Purge Exhaust Unit 2(3)A059 switch to START and OBSERVE red 2(3)ZL-9804 START light illuminated. Examiner Cue: 2(3)MA-059 red start light is illuminated.
Standard:       TURN 2(3)HS-9804, Cont Mini-Purge Exhaust Unit 2(3)A059 switch to START and OBSERVE red 2(3)ZL-9804 START light illuminated.
Comment: SAT      UNSAT     Perform Step: 6 START 2(3)MA-379, Mini-Purge Supply Unit, by Positioning 2(3)HS-9803 to START.
Examiner Cue:   2(3)MA-059 red start light is illuminated.
Standard: TURN 2(3)HS-9803, Cont Mini-Purge Supply Unit 2(3)A379 switch to START and OBSERVE red 2(3)ZLH-9804 START light illuminated. Examiner Cue: 2(3)MA-379 red start light is illuminated.
Comment:                                                         SAT      UNSAT Perform Step: 6 START 2(3)MA-379, Mini-Purge Supply Unit, by Positioning 2(3)HS-9803 to START.
Comment: SAT      UNSAT Perform Step: 7  Notify Chemistry Division that Mini-Purge is in progress.
Standard:       TURN 2(3)HS-9803, Cont Mini-Purge Supply Unit 2(3)A379 switch to START and OBSERVE red 2(3)ZLH-9804 START light illuminated.
Standard:
Examiner Cue:   2(3)MA-379 red start light is illuminated.
NOTIFY Chemistry Division that Mi ni-Purge is in progress and RECORD the chemist's name. Examiner Cue: Chemistry Tech Jones acknowledges Containment Mini-Purge in service on Unit 2 (Unit 3). Examiner Cue: The release limit is 1800 SCFM. Examiner Cue: Steps 2.5.8, 2.5.9, and 2.5.10 have been completed by another operator. Examiner Cue: Annunciator 57C10, CONTAINMENT RADIATION HIGH is alarming.
Comment:                                                         SAT      UNSAT Perform Step: 7  Notify Chemistry Division that Mini-Purge is in progress.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 5 of 8 SONGS Oct 2009 NRC JPM C-8 Rev 0.doc       Examiner Note: The following steps constitute the alternate path for this JPM.
Standard:       NOTIFY Chemistry Division that Mini-Purge is in progress and RECORD the chemists name.
Perform Step: 8  Acknowledge annunciator 57C10, CO NTAINMENT RADIATION HIGH.
Examiner Cue:   Chemistry Tech Jones acknowledges Containment Mini-Purge in service on Unit 2 (Unit 3).
Standard: DEPRESS Alarm Acknowledge button for Panel 57C and OBSERVE Annunciator 57C10 - CONTAINMENT RADIATION HIGH illuminated. Examiner Cue: Annunciator 57C10 is solidly lit, not flashing.
Examiner Cue:   The release limit is 1800 SCFM.
Comment: SAT      UNSAT      Examiner Note: Examinee should refer to SO23-15-57.C, 57C10, CONTAINMENT RADIATION HIGH (provide copy if referenced).
Examiner Cue:   Steps 2.5.8, 2.5.9, and 2.5.10 have been completed by another operator.
Examiner Note: Actuation of the Containment Purge Isolation System (CPIS) will satisfy the critical steps for closing the mini-purge supply and
Examiner Cue:   Annunciator 57C10, CONTAINMENT RADIATION HIGH is alarming.
Comment:                                                         SAT      UNSAT Page 4 of 8           SONGS Oct 2009 NRC JPM C-8 Rev 0.doc


exhaust valves.
Appendix C                            JPM STEPS                          Form ES-C-1 Examiner Note:  The following steps constitute the alternate path for this JPM.
Perform Step: 9 Containment Normal or Mini Purge in progress: If 2(3)RE-7828, or 2(3)RE-7865 (if aligned to the Containment Purge Stack) alarms High radiation, then ensure the following has occurred: 2(3)HV-9948, Containment Norm al Purge Isolation - CLOSED.
Perform Step: 8 Acknowledge annunciator 57C10, CONTAINMENT RADIATION HIGH.
Standard: OBSERVE 2(3)HV-9948, CNTMT PRG SPLY UNIT 2(3)A060 green CLOSE light illuminated and red OPEN light extinguished. Examiner Cue: HV-9948 is closed.
Standard:       DEPRESS Alarm Acknowledge button for Panel 57C and OBSERVE Annunciator 57C10 - CONTAINMENT RADIATION HIGH illuminated.
Comment: SAT     UNSAT     Perform Step: 10 Containment Normal or Mini Purge in progress: If 2(3)RE-7828, or 2(3)RE-7865 (if aligned to the Containment Purge Stack) alarms High radiation, then ensure the following has occurred:  2(3)HV-9951, Containment Norm al Purge Isolation - CLOSED.
Examiner Cue:   Annunciator 57C10 is solidly lit, not flashing.
Standard: OBSERVE 2(3)HV-9951, CNTMT PRG EXH UNIT 2(3)A060 green CLOSE light illuminated and red OPEN light extinguished. Examiner Cue: HV-9951 is closed.
Comment:                                                         SAT     UNSAT Examiner Note:   Examinee should refer to SO23-15-57.C, 57C10, CONTAINMENT RADIATION HIGH (provide copy if referenced).
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 6 of 8 SONGS Oct 2009 NRC JPM C-8 Rev 0.doc Perform Step: 11 Containment Normal or Mini Purge in progress: If 2(3)RE-7828, or 2(3)RE-7865 (if aligned to the Containment Purge Stack) alarms High radiation, then ensure the following has occurred: 2(3)HV-9921, CNTMT MINI PRG SPLY 2(3)A379 ISO VALVE -
Examiner Note:  Actuation of the Containment Purge Isolation System (CPIS) will satisfy the critical steps for closing the mini-purge supply and exhaust valves.
CLOSED. Standard: OBSERVE 2(3)HV-9921, CNTMT MINI PRG SPLY 2(3)A379 ISO VALVE green CLOSE light illuminated and red OPEN light extinguished.Examiner Cue: HV-9921 is open.
Perform Step: Containment Normal or Mini Purge in progress: If 2(3)RE-7828, or 2(3)RE-7865 (if aligned to the Containment Purge Stack) alarms High radiation, then ensure the following has occurred:
Comment: SAT      UNSAT      Perform Step: 12  Ensure CLOSED 2(3)HV-9921, CNTMT MINI PRG SPLY 2(3)A379 ISO VALVE. Standard:
* 2(3)HV-9948, Containment Normal Purge Isolation - CLOSED.
DEPRESS 2(3)HV-9921, CNTMT MINI PRG SPLY 2(3)A379 ISO VALVE CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished. Examiner Cue: HV-9921 is closed.
Standard:       OBSERVE 2(3)HV-9948, CNTMT PRG SPLY UNIT 2(3)A060 green CLOSE light illuminated and red OPEN light extinguished.
Comment: SAT     UNSAT     Perform Step: 13 Containment Normal or Mini Purge in progress: If 2(3)RE-7828, or 2(3)RE-7865 (if aligned to the Containment Purge Stack) alarms High radiation, then ensure the following has occurred: 2(3)HV-9925, Containment Mi ni-Purge Exhaust 2(3)MA-059 -
Examiner Cue:   HV-9948 is closed.
CLOSED. Standard: OBSERVE 2(3)HV-9925, CNTMT MINI PRG EXH 2(3)A059 ISO VALVE green CLOSE light illuminated and red OPEN light extinguished. Examiner Cue: HV-9925 is open.
Comment:                                                         SAT     UNSAT Perform Step: 10 Containment Normal or Mini Purge in progress: If 2(3)RE-7828, or 2(3)RE-7865 (if aligned to the Containment Purge Stack) alarms High radiation, then ensure the following has occurred:
Comment: SAT      UNSAT      Perform Step: 14  Ensure CLOSED 2(3)HV-9925, Containment Mini-Purge Exhaust 2(3)MA-059.
* 2(3)HV-9951, Containment Normal Purge Isolation - CLOSED.
Standard:
Standard:       OBSERVE 2(3)HV-9951, CNTMT PRG EXH UNIT 2(3)A060 green CLOSE light illuminated and red OPEN light extinguished.
DEPRESS 2(3)HV-9925, CNTMT MI NI PRG EXH 2(3)A059 ISO VALVE CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished. Examiner Cue: HV-9925 is closed.
Examiner Cue:   HV-9951 is closed.
Comment: SAT     UNSAT Appendix C JPM STEPS Form ES-C-1 Page 7 of 8 SONGS Oct 2009 NRC JPM C-8 Rev 0.doc Perform Step: 15a Containment Normal or Mini Purge in progress: If 2(3)RE-7828, or 2(3)RE-7865 (if aligned to the Containment Purge Stack) alarms High radiation, then ensure the following has occurred:  2(3)MA-374, 2(3)MA-060, 2(3)MA-379, and 2(3)MA-059, Containment Normal and Mini-P urge Supply and Exhaust Fans are STOPPED.
Comment:                                                         SAT     UNSAT Page 5 of 8           SONGS Oct 2009 NRC JPM C-8 Rev 0.doc
Standard:
At Panel 2(3)L-155, OBSERVE Containment Normal Purge Supply and Exhaust Fans green STOP lights are illuminated:  CNTMT Purge Supply Fan 2(3)A374. CNTMT Purge Exhaust Fan 2(3)A060. Examiner Cue: The Normal Purge Supply and Exhaust fans are stopped.
Comment: SAT      UNSAT      Perform Step: 15b Containment Normal or Mini Purge in progress: If 2(3)RE-7828, or 2(3)RE-7865 (if aligned to the Containment Purge Stack) alarms High radiation, then ensure the following has occurred:  2(3)MA-374, 2(3)MA-060, 2(3)MA-379, and 2(3)MA-059, Containment Normal and Mini-P urge Supply and Exhaust Fans are STOPPED.
Standard: At Panel 2(3)L-155, OBSERVE Containment Mini-Purge Supply and Exhaust Fans green STOP lights are illuminated:  CNTMT Mini-Purge Supply Fan 2(3)A379. CNTMT Mini-Purge Exhaust Fan 2(3)A059. Terminating Cue: The Mini-Purge Supply and Exhaust fans are stopped. This JPM is complete.
Comment: SAT      UNSAT      STOP TIME:
Appendix C JPM CUE SHEET Form ES-C-1 Page 8 of 8 SONGS Oct 2009 NRC JPM C-8 Rev 0.doc INITIAL CONDITIONS: Given the following conditions:  Unit 2 (Unit 3) is operating at full power. A Containment entry must be made to investigate an abnormal noise in a Reactor Coolant Pump. Prior to the entry, a Containment Mini-Purge is to be


performed. 2(3)RT-7828, Containmen t Purge Stack Radiation Monitor is out-of-service.  
Appendix C                            JPM STEPS                            Form ES-C-1 Perform Step: 11  Containment Normal or Mini Purge in progress: If 2(3)RE-7828, or 2(3)RE-7865 (if aligned to the Containment Purge Stack) alarms High radiation, then ensure the following has occurred:
* 2(3)HV-9921, CNTMT MINI PRG SPLY 2(3)A379 ISO VALVE -
CLOSED.
Standard:        OBSERVE 2(3)HV-9921, CNTMT MINI PRG SPLY 2(3)A379 ISO VALVE green CLOSE light illuminated and red OPEN light extinguished.
Examiner Cue:    HV-9921 is open.
Comment:                                                          SAT    UNSAT Perform Step: 12 Ensure CLOSED 2(3)HV-9921, CNTMT MINI PRG SPLY 2(3)A379 ISO VALVE.
Standard:        DEPRESS 2(3)HV-9921, CNTMT MINI PRG SPLY 2(3)A379 ISO VALVE CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished.
Examiner Cue:    HV-9921 is closed.
Comment:                                                          SAT    UNSAT Perform Step: 13  Containment Normal or Mini Purge in progress: If 2(3)RE-7828, or 2(3)RE-7865 (if aligned to the Containment Purge Stack) alarms High radiation, then ensure the following has occurred:
* 2(3)HV-9925, Containment Mini-Purge Exhaust 2(3)MA-059 -
CLOSED.
Standard:        OBSERVE 2(3)HV-9925, CNTMT MINI PRG EXH 2(3)A059 ISO VALVE green CLOSE light illuminated and red OPEN light extinguished.
Examiner Cue:    HV-9925 is open.
Comment:                                                          SAT    UNSAT Perform Step: 14 Ensure CLOSED 2(3)HV-9925, Containment Mini-Purge Exhaust 2(3)MA-059.
Standard:        DEPRESS 2(3)HV-9925, CNTMT MINI PRG EXH 2(3)A059 ISO VALVE CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished.
Examiner Cue:    HV-9925 is closed.
Comment:                                                          SAT    UNSAT Page 6 of 8            SONGS Oct 2009 NRC JPM C-8 Rev 0.doc


INITIATING CUE: The Control Room Supervisor directs you to INITIATE a Unit 2 (Unit 3) Containment Mini-Purge per SO23-1-4.2, Containment Purge and Recirculation Filtration System. Attachment 6, Operation of the Containment Mini-Purge System has been completed through Step 2.4.3. 2(3)RT-7865, Plant Vent St ack/Containment Purge Stack Wide Range Gas Monitor is aligned to the Containment Purge Stack.  
Appendix C                            JPM STEPS                            Form ES-C-1 Perform Step: 15a Containment Normal or Mini Purge in progress: If 2(3)RE-7828, or 2(3)RE-7865 (if aligned to the Containment Purge Stack) alarms High radiation, then ensure the following has occurred:
* 2(3)MA-374, 2(3)MA-060, 2(3)MA-379, and 2(3)MA-059, Containment Normal and Mini-Purge Supply and Exhaust Fans are STOPPED.
Standard:        At Panel 2(3)L-155, OBSERVE Containment Normal Purge Supply and Exhaust Fans green STOP lights are illuminated:
* CNTMT Purge Supply Fan 2(3)A374.
* CNTMT Purge Exhaust Fan 2(3)A060.
Examiner Cue:    The Normal Purge Supply and Exhaust fans are stopped.
Comment:                                                          SAT    UNSAT Perform Step: 15b Containment Normal or Mini Purge in progress: If 2(3)RE-7828, or 2(3)RE-7865 (if aligned to the Containment Purge Stack) alarms High radiation, then ensure the following has occurred:
* 2(3)MA-374, 2(3)MA-060, 2(3)MA-379, and 2(3)MA-059, Containment Normal and Mini-Purge Supply and Exhaust Fans are STOPPED.
Standard:        At Panel 2(3)L-155, OBSERVE Containment Mini-Purge Supply and Exhaust Fans green STOP lights are illuminated:
* CNTMT Mini-Purge Supply Fan 2(3)A379.
* CNTMT Mini-Purge Exhaust Fan 2(3)A059.
Terminating Cue:  The Mini-Purge Supply and Exhaust fans are stopped. This JPM is complete.
Comment:                                                          SAT    UNSAT STOP TIME:
Page 7 of 8            SONGS Oct 2009 NRC JPM C-8 Rev 0.doc


Appendix C JPM WORKSHEET Form ES-C-1 Page 1 of 5 SONGS Oct 2009 NRC JPM P-1 Rev 0.doc        Facility: SONGS JPM # RO/SRO NRC P-1 Task #151078 K/A #059 A2.12    3.1/3.4  SF-4STitle: Local-Manual Operation of Main Feedwater Control Valve Examinee (Print):
Appendix C                     JPM CUE SHEET                          Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:
Testing Method:
* Unit 2 (Unit 3) is operating at full power.
Simulated Performance:  X  Classroom:  Actual Performance:  Simulator:
* A Containment entry must be made to investigate an abnormal noise in a Reactor Coolant Pump.
Plant:  X READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue. When you complete the task successfully, the objective for this JPM will be satisfied.
* Prior to the entry, a Containment Mini-Purge is to be performed.
Initial Conditions: Given the following conditions: Unit 2 (Unit 3) is at 100% power. Maintenance is to be performed on the Positioner Controller for the Unit 2 (Unit 3) Main Feedwater Control Valve, 2(3)FV-1111. This will require Local-Manual operat ion of the Unit 2 (Unit 3) Main Feedwater Control Valve, 2(3)FV-1111.
* 2(3)RT-7828, Containment Purge Stack Radiation Monitor is out-of-service.
Initiating Cue: The Control Room Supervisor DIRECTS you to take LOCAL-MANUAL Control of the Unit 2 (Unit 3) 2(3)FV
INITIATING CUE:     The Control Room Supervisor directs you to INITIATE a Unit 2 (Unit 3) Containment Mini-Purge per SO23-1-4.2, Containment Purge and Recirculation Filtration System.
-1111, Main Feedwater Control Valve, per SO23-9-6, Feedwater Control S ystem Operation, Section 6.3, Local-Manual Operation of Main Feedwater Control Valves.
* Attachment 6, Operation of the Containment Mini-Purge System has been completed through Step 2.4.3.
Task Standard: Locate and correctly perform Critical Steps of SO23-9-6.  
* 2(3)RT-7865, Plant Vent Stack/Containment Purge Stack Wide Range Gas Monitor is aligned to the Containment Purge Stack.
Page 8 of 8        SONGS Oct 2009 NRC JPM C-8 Rev 0.doc


Required Materials: SO23-9-6, Feedwater Control System Operation, Rev. 22
Appendix C                                    JPM WORKSHEET                                  Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC P-1                Task #151078      K/A #059 A2.12      3.1/3.4      SF-4S


Validation Time: 7 minutes Time Critical: N/A Completion Time: ________ minutes Comments:   Result: SAT UNSAT   Examiner (Print / Sign): Date:
==Title:==
Appendix C JPM WORKSHEET Form ES-C-1 Page 2 of 5 SONGS Oct 2009 NRC JPM P-1 Rev 0.doc PLANT SETUP
Local-Manual Operation of Main Feedwater Control Valve Examinee (Print):
Testing Method:
Simulated Performance:          X                            Classroom:
Actual Performance:                                          Simulator:
Plant:          X READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.
When you complete the task successfully, the objective for this JPM will be satisfied.
Initial Conditions:      Given the following conditions:
* Unit 2 (Unit 3) is at 100% power.
* Maintenance is to be performed on the Positioner Controller for the Unit 2 (Unit 3) Main Feedwater Control Valve, 2(3)FV-1111.
* This will require Local-Manual operation of the Unit 2 (Unit 3) Main Feedwater Control Valve, 2(3)FV-1111.
Initiating Cue:          The Control Room Supervisor DIRECTS you to take LOCAL-MANUAL Control of the Unit 2 (Unit 3) 2(3)FV-1111, Main Feedwater Control Valve, per SO23-9-6, Feedwater Control System Operation, Section 6.3, Local-Manual Operation of Main Feedwater Control Valves.
Task Standard:          Locate and correctly perform Critical Steps of SO23-9-6.
Required Materials: SO23-9-6, Feedwater Control System Operation, Rev. 22 Validation Time:         7 minutes     Time Critical: N/A     Completion Time:   ________ minutes Comments:
Result:   SAT             UNSAT Examiner (Print / Sign):                                                           Date:
Page 1 of 5                       SONGS Oct 2009 NRC JPM P-1 Rev 0.doc


EXAMINER: PROVIDE the examinee with a copy of: SO23-9-6, Feedwater Control System Operation, Section 6.3, Local-Manual Operation of Main Feedwater Control Valves.
Appendix C                        JPM WORKSHEET                          Form ES-C-1 PLANT SETUP EXAMINER:
EXAMINER NOTE
PROVIDE the examinee with a copy of:
: This JPM can be performed on either Unit. CIRCLE the Unit on which the JPM is to be performed on the JPM Worksheet and the JPM Cue Sheet.  
* SO23-9-6, Feedwater Control System Operation, Section 6.3, Local-Manual Operation of Main Feedwater Control Valves.
.
EXAMINER NOTE:
Appendix C JPM STEPS Form ES-C-1 Page 3 of 5 SONGS Oct 2009 NRC JPM P-1 Rev 0.doc         - Check Mark Denotes Critical Step START TIME:
This JPM can be performed on either Unit. CIRCLE the Unit on which the JPM is to be performed on the JPM Worksheet and the JPM Cue Sheet.
Examiner Cue: Remind the examinee to simulate all actions.
Page 2 of 5             SONGS Oct 2009 NRC JPM P-1 Rev 0.doc
Perform Step: 1 Establish communications between CR and Operator at the MFW Control Valve.
Standard: ESTABLISH communications with the Control Room. Examiner Cue: Communications are established.
Comment: SAT      UNSAT      Perform Step: 2 TRANSFER 2(3)FV-1111, MFW Contro l Valve Controller, to LOCAL. (CR-52) Standard: DIRECT the Control Room to TRANSFER 2(3)FV-1111, Main Feedwater Control Valve Controller to LOCAL. Examiner Cue: 2(3)FV-1111 is in LOCAL.
Comment: SAT      UNSAT      Perform Step: 3 TURN LARGE HANDWHEEL CLOCKWISE until snug at limit of travel. (At this point, the large lead screw contacts the mechanical actuating device and further move ment will cause actual valve movement.)
Standard: TURN 2(3)FV-1111, MFW Control Valve large handwheel CLOCKWISE until snug at limit of travel. Examiner Cue: The large handwheel is snug at the limit of travel.
Comment: SAT      UNSAT      Perform Step: 4 TURN SMALL HANDWHEEL COUNTERCLOCKWISE until tight against


hub of large handwheel.
Appendix C                              JPM STEPS                            Form ES-C-1
Standard: TURN 2(3)FV-1111, MFW Control Valve small handwheel  
- Check Mark Denotes Critical Step                      START TIME:
Examiner Cue:      Remind the examinee to simulate all actions.
Perform Step: 1    Establish communications between CR and Operator at the MFW Control Valve.
Standard:          ESTABLISH communications with the Control Room.
Examiner Cue:      Communications are established.
Comment:                                                            SAT    UNSAT Perform Step: 2    TRANSFER 2(3)FV-1111, MFW Control Valve Controller, to LOCAL.
(CR-52)
Standard:          DIRECT the Control Room to TRANSFER 2(3)FV-1111, Main Feedwater Control Valve Controller to LOCAL.
Examiner Cue:      2(3)FV-1111 is in LOCAL.
Comment:                                                            SAT    UNSAT Perform Step: 3  TURN LARGE HANDWHEEL CLOCKWISE until snug at limit of travel.
(At this point, the large lead screw contacts the mechanical actuating device and further movement will cause actual valve movement.)
Standard:          TURN 2(3)FV-1111, MFW Control Valve large handwheel CLOCKWISE until snug at limit of travel.
Examiner Cue:      The large handwheel is snug at the limit of travel.
Comment:                                                            SAT    UNSAT Perform Step: 4  TURN SMALL HANDWHEEL COUNTERCLOCKWISE until tight against hub of large handwheel.
Standard:         TURN 2(3)FV-1111, MFW Control Valve small handwheel COUNTERCLOCKWISE until tight against hub of large handwheel.
Examiner Cue:      The small handwheel is tight against hub of large handwheel.
Comment:                                                            SAT    UNSAT Page 3 of 5              SONGS Oct 2009 NRC JPM P-1 Rev 0.doc


COUNTERCLOCKWISE until tight against hub of large handwheel. Examiner Cue: The small handwheel is tight against hub of large handwheel.
Appendix C                           JPM STEPS                         Form ES-C-1 Perform Step: 5 OPEN the two (black knob handled) Operating Piston Air Bypass Valves.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 4 of 5 SONGS Oct 2009 NRC JPM P-1 Rev 0.doc Perform Step: 5 OPEN the two (black knob handled) Operating Piston Air Bypass Valves. Standard: TURN 2(3)FV-1111, MFW Control Valve both (black knob handled)
Standard:       TURN 2(3)FV-1111, MFW Control Valve both (black knob handled)
Operating Piston Air Bypass Valv es COUNTERCLOCKWISE to OPEN. Examiner Cue: Both Operating Piston Air Bypass Valves are open.
Operating Piston Air Bypass Valves COUNTERCLOCKWISE to OPEN.
Comment: SAT     UNSAT     Perform Step: 6 CLOSE  Air Supply to FY-1111:
Examiner Cue:   Both Operating Piston Air Bypass Valves are open.
S2(3)2417MR239 Standard:
Comment:                                                     SAT       UNSAT Perform Step: 6 CLOSE  Air Supply to FY-1111:
TURN S2(3)2417MR239, Air Supply to 2(3)FY-1111, CLOCKWISE to  
S2(3)2417MR239 Standard:       TURN S2(3)2417MR239, Air Supply to 2(3)FY-1111, CLOCKWISE to CLOSE.
Examiner Cue:    The air supply to 2(3)FY-1111 is closed.
Comment:                                                    SAT        UNSAT Perform Step: 7 CLOSE Air Supply to FY-1114:
S2(3)2417MR240 Standard:        TURN S2(3)2417MR240, Air Supply to I/P Converter 2(3)FY-1114 CLOCKWISE to CLOSE.
Examiner Cue:    The air supply to 2(3)FY-1114 is closed.
Comment:                                                    SAT        UNSAT Examiner Cue:    The Control Room directs you to open 2(3)FV-1111 one-half turn.
Perform Step: 8 OPERATE the large handwheel to reposition valve as directed by the Control Room or CRS.
* Rotating handwheel clockwise Closes valve.
* Rotating handwheel counterclockwise Opens valve Standard:        TURN 2(3)FV-1111, Main Feedwater Control Valve Large handwheel one-half (1/2) turn in the COUNTERCLOCKWISE direction.
Terminating Cue: 2(3)FV-1111 has OPENED one-half turn. This JPM is complete.
Comment:                                                    SAT        UNSAT STOP TIME:
Page 4 of 5          SONGS Oct 2009 NRC JPM P-1 Rev 0.doc


CLOSE. Examiner Cue: The air supply to 2(3)FY-1111 is closed.
Appendix C                     JPM CUE SHEET                           Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:
Comment: SAT      UNSAT        Perform Step: 7  CLOSE Air Supply to FY-1114:
* Unit 2 (Unit 3) is at 100% power.
S2(3)2417MR240 Standard:
* Maintenance is to be performed on the Positioner Controller for the Unit 2 (Unit 3) Main Feedwater Control Valve, 2(3)FV-1111.
TURN S2(3)2417MR240, Air Supply to I/P Converter 2(3)FY-1114 CLOCKWISE to CLOSE. Examiner Cue: The air supply to 2(3)FY-1114 is closed.
* This will require Local-Manual operation of the Unit 2 (Unit 3) Main Feedwater Control Valve, 2(3)FV-1111.
Comment: SAT      UNSAT      Examiner Cue: The Control Room direct s you to open 2(3)FV-1111 one-half turn.
INITIATING CUE:    The Control Room Supervisor DIRECTS you to take LOCAL-MANUAL Control of the Unit 2 (Unit 3) 2(3)FV-1111, Main Feedwater Control Valve, per SO23-9-6, Feedwater Control System Operation, Section 6.3, Local-Manual Operation of Main Feedwater Control Valves.
Perform Step: 8  OPERATE the large handwheel to repos ition valve as directed by the Control Room or CRS. Rotating handwheel clockwise Closes valve. Rotating handwheel counterclockwise Opens valve Standard: TURN 2(3)FV-1111, Main Feedwater Control Valve Large handwheel one-half (1/2) turn in the COUNTERCLOCKWISE direction. Terminating Cue: 2(3)FV-1111 has OPENED one-half turn. This JPM is complete.
Page 5 of 5        SONGS Oct 2009 NRC JPM P-1 Rev 0.doc
Comment: SAT      UNSAT      STOP TIME:
Appendix C JPM CUE SHEET Form ES-C-1 Page 5 of 5 SONGS Oct 2009 NRC JPM P-1 Rev 0.doc INITIAL CONDITIONS: Given the following conditions: Unit 2 (Unit 3) is at 100% power. Maintenance is to be performed on the Positioner Controller for the Unit 2 (Unit 3) Main Feedwater Control Valve, 2(3)FV-1111. This will require Local-Manua l operation of the Unit 2 (Unit 3) Main Feedwater C ontrol Valve, 2(3)FV-1111.  


INITIATING CUE: The Control Room Supervisor DIRECTS you to take LOCAL-MANUAL Control of the Unit 2 (Unit 3) 2(3)FV-1111, Main Feedwater Control Valve, per SO23-9-6, Feedwater Control System Operation, Section 6.
Appendix C                                    JPM WORKSHEET                                  Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC P-2               Task #191625      K/A #004 A2.14        3.8/3.9     SF-2
3, Local-Manual Operation of Main Feedwater Control Valves.


Appendix C JPM WORKSHEET Form ES-C-1 Page 1 of 7 SONGS Oct 2009 NRC JPM P-2 Rev 0.doc        Facility: SONGS JPM # RO/SRO NRC P-2 Task #191625 K/A #004  A2.14  3.8/3.9  SF-2Title: Locally Align Charging Pump Suction to the Refueling Water Storage Tank Examinee (Print):
==Title:==
Locally Align Charging Pump Suction to the Refueling Water Storage Tank Examinee (Print):
Testing Method:
Testing Method:
Simulated Performance:   X   Classroom:   Actual Performance:   Simulator:
Simulated Performance:         X                             Classroom:
Plant:   X READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue. When you complete the task successfully, the objective for this JPM will be satisfied.
Actual Performance:                                           Simulator:
Initial Conditions: Given the following conditions: The Control Room has been evac uated per SO23-13-2, Shutdown from Outside the Control Room and a cooldown to Cold Shutdown is in progress. The Boric Acid Makeup (BAMU) Ta nks are aligned for gravity feed on Unit 2 (Unit 3).
Plant:         X READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.
Initiating Cue: The Control Room Supervisor directs you to MONITOR BAMU Tank levels and when required, SHIFT Charging Pump suction to the Refueling Water Storage Tank per SO23-13-2, Shutdown From Outside the Control Room: Attachment 10, Radwaste Op erator Duties for Unit 2. Attachment 11, Auxiliary Primary Operator Duties for Unit 3.
When you complete the task successfully, the objective for this JPM will be satisfied.
Task Standard: Locate and correctly perform Critical Steps of SO23-13-2.  
Initial Conditions:     Given the following conditions:
 
* The Control Room has been evacuated per SO23-13-2, Shutdown from Outside the Control Room and a cooldown to Cold Shutdown is in progress.
* The Boric Acid Makeup (BAMU) Tanks are aligned for gravity feed on Unit 2 (Unit 3).
Initiating Cue:         The Control Room Supervisor directs you to MONITOR BAMU Tank levels and when required, SHIFT Charging Pump suction to the Refueling Water Storage Tank per SO23-13-2, Shutdown From Outside the Control Room:
* Attachment 10, Radwaste Operator Duties for Unit 2.
* Attachment 11, Auxiliary Primary Operator Duties for Unit 3.
Task Standard:           Locate and correctly perform Critical Steps of SO23-13-2.
Required Materials: SO23-13-2, Shutdown From Outside the Control Room, Rev 12.
Required Materials: SO23-13-2, Shutdown From Outside the Control Room, Rev 12.
Validation Time: 10 minutes Time Critical: N/A Completion Time: ________ minutes Comments:   Result: SAT UNSAT   Examiner (Print / Sign): Date:
Validation Time:         10 minutes   Time Critical: N/A     Completion Time:   ________ minutes Comments:
Appendix C JPM WORKSHEET Form ES-C-1 Page 2 of 7 SONGS Oct 2009 NRC JPM P-2 Rev 0.doc PLANT SETUP EXAMINER: PROVIDE the examinee with a copy of:  SO23-13-2, Shutdown From Outside the Control Room. Attachment 10, Radwaste Operator Duties for Unit 2. Attachment 11, Primary Auxiliary Operator Duties for Unit 3. MARK UP BAMU Tank levels showing a trend towards 25% for 2(3)TK-072 and 22% for 2(3)TK-071 when the next reading is obtained.
Result:   SAT             UNSAT Examiner (Print / Sign):                                                           Date:
Page 1 of 7                       SONGS Oct 2009 NRC JPM P-2 Rev 0.doc


Appendix C JPM STEPS Form ES-C-1 Page 3 of 7 SONGS Oct 2009 NRC JPM P-2 Rev 0.doc          - Check Mark Denotes Critical Step START TIME:
Appendix C                         JPM WORKSHEET                      Form ES-C-1 PLANT SETUP EXAMINER:
Examiner Cue: Remind the examinee to simulate all actions. Examiner Cue: Boric Acid Makeup (BAMU) Tank levels were last taken 15 minutes ago. Perform Step: 1 Determine BAMU tank levels every 15 minutes.
PROVIDE the examinee with a copy of:
Standard: DETERMINE that no flow exists past the BAMU Pump suction pressure gauges since Initial Conditions spec ify gravity feed in progress. Examiner Cue: BAMU Pumps, P-174 and P-175 are not running.
* SO23-13-2, Shutdown From Outside the Control Room.
Comment: SAT      UNSAT      Perform Step: 2 Determine BAMU tank levels every 15 minutes.
* Attachment 10, Radwaste Operator Duties for Unit 2.
Standard:
* Attachment 11, Primary Auxiliary Operator Duties for Unit 3.
OBSERVE 2(3)PI-9273, Bo ric Acid Makeup Pump 2(3)P175 Inlet
* MARK UP BAMU Tank levels showing a trend towards 25% for 2(3)TK-072 and 22% for 2(3)TK-071 when the next reading is obtained.
Page 2 of 7                SONGS Oct 2009 NRC JPM P-2 Rev 0.doc


Pressure gauge. Examiner Cue: PI-9273 indicates 9.2 psi.
Appendix C                            JPM STEPS                                Form ES-C-1
Comment: SAT     UNSAT     Perform Step: 3 Determine BAMU tank levels every 15 minutes.
- Check Mark Denotes Critical Step                    START TIME:
Standard:
Examiner Cue:      Remind the examinee to simulate all actions.
REFER to FIGURE LVL-BAMU and DETERMINE 2(3)T-072, BAMU Tank to be 25% with 9.2 psi suction pressure on 2(3)PI-9273.
Examiner Cue:      Boric Acid Makeup (BAMU) Tank levels were last taken 15 minutes ago.
Comment: SAT     UNSAT     Perform Step: 4 Determine BAMU tank levels every 15 minutes.
Perform Step: 1    Determine BAMU tank levels every 15 minutes.
Standard:
Standard:          DETERMINE that no flow exists past the BAMU Pump suction pressure gauges since Initial Conditions specify gravity feed in progress.
OBSERVE 2(3)PI-9279, Bo ric Acid Makeup Pump 2(3)P174 Inlet  
Examiner Cue:      BAMU Pumps, P-174 and P-175 are not running.
Comment:                                                            SAT      UNSAT Perform Step: 2    Determine BAMU tank levels every 15 minutes.
Standard:          OBSERVE 2(3)PI-9273, Boric Acid Makeup Pump 2(3)P175 Inlet Pressure gauge.
Examiner Cue:     PI-9273 indicates 9.2 psi.
Comment:                                                           SAT       UNSAT Perform Step: 3   Determine BAMU tank levels every 15 minutes.
Standard:         REFER to FIGURE LVL-BAMU and DETERMINE 2(3)T-072, BAMU Tank to be 25% with 9.2 psi suction pressure on 2(3)PI-9273.
Comment:                                                           SAT       UNSAT Perform Step: 4   Determine BAMU tank levels every 15 minutes.
Standard:         OBSERVE 2(3)PI-9279, Boric Acid Makeup Pump 2(3)P174 Inlet Pressure gauge.
Examiner Cue:      PI-9279 indicates 9.0 psi.
Comment:                                                            SAT      UNSAT Perform Step: 5  Determine BAMU tank levels every 15 minutes.
Standard:          REFER to FIGURE LVL-BAMU and DETERMINE 2(3)T-071, BAMU Tank to be 22% with 9.0 psi suction pressure on 2(3)PI-9279.
Comment:                                                            SAT      UNSAT Page 3 of 7            SONGS Oct 2009 NRC JPM P-2 Rev 0.doc


Pressure gauge. Examiner Cue: PI-9279 indicates 9.0 psi.
Appendix C                           JPM STEPS                         Form ES-C-1 Perform Step: 6 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:
Comment: SAT      UNSAT      Perform Step: 5 Determine BAMU tank levels every 15 minutes.
Standard:       DETERMINE that BAMU Tank, 2(3)T-071, is approaching 21.8%.
Standard:
Comment:                                                     SAT      UNSAT Perform Step: 7 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:
REFER to FIGURE LVL-BAMU and DETERMINE 2(3)T-071, BAMU Tank to be 22% with 9.0 psi suction pressure on 2(3)PI-9279.
* LOCALLY OPEN LV-0227C, RWST to Charging Pumps Gravity Feed Valve.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 4 of 7 SONGS Oct 2009 NRC JPM P-2 Rev 0.doc Perform Step: 6 WHEN the first BAMU Tank approaches 21.
Standard:       ROTATE 2(3)LV-0227C, RWST to Charging Pump Suction Isolation Valve manual handwheel in the COUNTERCLOCKWISE direction and DEPRESS manual clutch lever while turning to engage the handwheel.
8% level, as seen on Figure LVL-BAMU, THEN perform the following:
Comment:                                                     SAT      UNSAT Perform Step: 8 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:
Standard:
* LOCALLY OPEN LV-0227C, RWST to Charging Pumps Gravity Feed Valve.
DETERMINE that BAMU Tank, 2(3)T-071, is approaching 21.8%.
Standard:       OBSERVE 2(3)LV-0227C, RWST to Charging Pump Suction Isolation Valve outward stem motion and RELEASE manual clutch lever when motion is observed.
Comment: SAT      UNSAT     Perform Step: 7 WHEN the first BAMU Tank approaches 21.
Examiner Cue:   LV-0227C, RWST to Charging Pumps Gravity Feed Valve is moving in the open direction.
8% level, as seen on Figure LVL-BAMU, THEN perform the following: LOCALLY OPEN LV-0227C, RWST to Charging Pumps Gravity Feed Valve.
Comment:                                                     SAT      UNSAT Perform Step: 9 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:
Standard:
* LOCALLY OPEN LV-0227C, RWST to Charging Pumps Gravity Feed Valve.
ROTATE 2(3)LV-0227C, RWST to C harging Pump Suction Isolation Valve manual handwheel in the COUNTERCLOCKWISE direction and DEPRESS manual clutch lever while turning to engage the handwheel.
Standard:       ROTATE 2(3)LV-0227C, RWST to Charging Pump Suction Isolation Valve manual handwheel in the COUNTERCLOCKWISE direction until local position indication is 100%.
Comment: SAT      UNSAT     Perform Step: 8 WHEN the first BAMU Tank approaches 21.
Examiner Cue:   LV-0227C, RWST to Charging Pumps Gravity Feed Valve is full open.
8% level, as seen on Figure LVL-BAMU, THEN perform the following: LOCALLY OPEN LV-0227C, RWST to Charging Pumps Gravity Feed Valve.
Comment:                                                     SAT      UNSAT Page 4 of 7           SONGS Oct 2009 NRC JPM P-2 Rev 0.doc
Standard: OBSERVE 2(3)LV-0227C, RWST to Charging Pump Suction Isolation Valve outward stem motion and RELE ASE manual clutch lever when motion is observed. Examiner Cue: LV-0227C, RWST to Charging Pumps Gravity Feed Valve is moving in the open direction.
Comment: SAT      UNSAT     Perform Step: 9 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following: LOCALLY OPEN LV-0227C, RWST to Charging Pumps Gravity Feed Valve.
Standard:
ROTATE 2(3)LV-0227C, RWST to C harging Pump Suction Isolation Valve manual handwheel in the COUNTERCLOCKWISE direction until local position indication is 100%. Examiner Cue: LV-0227C, RWST to Charging Pumps Gravity Feed Valve is full open. Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 5 of 7 SONGS Oct 2009 NRC JPM P-2 Rev 0.doc Perform Step: 10 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:  CLOSE BAMU Tank, 2MT-072, Gravity Feed Valve, 2HV-9235.
Standard:
ROTATE 2(3)HV-9235, Boric Acid Makeup Tank 2(3)T072 Gravity Feed to Charging Pump Suction ISO Valve manual handwheel in the CLOCKWISE direction and DEPRESS manual clutch lever while turning to engage the handwheel.
Comment: SAT      UNSAT      Perform Step: 11 WHEN the first BAMU Tank approaches 21.
8% level, as seen on Figure LVL-BAMU, THEN perform the following:  CLOSE BAMU Tank, 2MT-072, Gravity Feed Valve, 2HV-9235.
Standard: OBSERVE 2(3)HV-9235, Boric Acid Makeup Tank 2(3)T072 Gravity Feed to Charging Pump Suction ISO Valve for inward stem motion and RELEASE the manual clutch lever when motion is observed. Examiner Cue: HV-9235, BAMU Tank T-072 Gravity Feed Valve is moving in the close direction.
Comment: SAT      UNSAT     Perform Step: 12 WHEN the first BAMU Tank approaches 21.
8% level, as seen on Figure LVL-BAMU, THEN perform the following:  CLOSE BAMU Tank, 2MT-072, Gravity Feed Valve, 2HV-9235.
Standard:
ROTATE 2(3)HV-9235, Boric Acid Makeup Tank 2(3)T072 Gravity Feed to Charging Pump Suction ISO Valve manual handwheel in the CLOCKWISE direction until loca l position indication is 0%. Examiner Cue:  HV-9235, BAMU Tank T-072 Gravity Feed Valve is closed.
Comment: SAT      UNSAT      Perform Step: 13  WHEN the first BAMU Tank approaches 21.
8% level, as seen on Figure LVL-BAMU, THEN perform the following:  CLOSE BAMU Tank, 2MT-071, Gravity Feed Valve, 2HV-9240.
Standard:
ROTATE 2(3)HV-9240, Boric Acid Makeup Tank 2(3)T071 Gravity Feed to Charging Pump Suction ISO Valve manual handwheel in the CLOCKWISE direction and DEPRESS manual clutch lever while turning to engage the handwheel.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 6 of 7 SONGS Oct 2009 NRC JPM P-2 Rev 0.doc Perform Step: 14 WHEN the first BAMU Tank approaches 21.
8% level, as seen on Figure LVL-BAMU, THEN perform the following:  CLOSE BAMU Tank, 2MT-071, Gravity Feed Valve, 2HV-9240.
Standard: OBSERVE 2(3)HV-9240, Boric Acid Makeup Tank 2(3)T071 Gravity Feed to Charging Pump Suction ISO Valve for inward stem motion and RELEASE manual clutch lever when motion is observed. Examiner Cue: HV-9240, BAMU Tank T-071 Gravity Feed Valve is moving in the close direction.
Comment: SAT      UNSAT      Perform Step: 15 WHEN the first BAMU Tank approaches 21.
8% level, as seen on Figure LVL-BAMU, THEN perform the following:  CLOSE BAMU Tank, 2MT-071, Gravity Feed Valve, 2HV-9240.
Standard:
ROTATE 2(3)HV-9240, Boric Acid Makeup Tank 2(3)T071 Gravity Feed to Charging Pump Suction ISO Valve manual handwheel in the CLOCKWISE direction until loca l position indication is 0%. Examiner Cue:  BAMU Tank T-071 Gravity Feed Valve is closed.
Perform Step: 16  Notify the Unit 2 CRS of transfer to RWST Standard:
REPORT to the Unit 2 (Unit 3) Cont rol Room Supervisor that Charging Pump suctions are aligned to t he Refueling Water Storage Tank. Terminating Cue: The Control Room Supervisor acknowledges that Charging Pump suctions are aligned to the Refueling Water Storage Tank. This JPM is complete.
STOP TIME:
Appendix C JPM CUE SHEET Form ES-C-1 Page 7 of 7 SONGS Oct 2009 NRC JPM P-2 Rev 0.doc INITIAL CONDITIONS: Given the following conditions:  The Control Room has been evacuated per SO23-13-2, Shutdown From Outside the Control Room and a cooldown to Cold Shutdown is in progress. The Boric Acid Makeup (BAMU) Tanks are aligned for gravity feed on Unit 2 (Unit 3).


INITIATING CUE: The Control Room Supervisor directs you to MONITOR BAMU Tank levels and when required, SHIFT Charging Pump suction to the Refueling Water Storage Tank per SO23-13-2, Shutdown From Outside the Control Room: Attachment 10, Radwaste Operator Duties for Unit 2. Attachment 11, Auxiliary Primary Operator Duties for
Appendix C                          JPM STEPS                                Form ES-C-1 Perform Step: 10 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:
* CLOSE BAMU Tank, 2MT-072, Gravity Feed Valve, 2HV-9235.
Standard:         ROTATE 2(3)HV-9235, Boric Acid Makeup Tank 2(3)T072 Gravity Feed to Charging Pump Suction ISO Valve manual handwheel in the CLOCKWISE direction and DEPRESS manual clutch lever while turning to engage the handwheel.
Comment:                                                        SAT      UNSAT Perform Step: 11 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:
* CLOSE BAMU Tank, 2MT-072, Gravity Feed Valve, 2HV-9235.
Standard:        OBSERVE 2(3)HV-9235, Boric Acid Makeup Tank 2(3)T072 Gravity Feed to Charging Pump Suction ISO Valve for inward stem motion and RELEASE the manual clutch lever when motion is observed.
Examiner Cue:    HV-9235, BAMU Tank T-072 Gravity Feed Valve is moving in the close direction.
Comment:                                                        SAT      UNSAT Perform Step: 12 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:
* CLOSE BAMU Tank, 2MT-072, Gravity Feed Valve, 2HV-9235.
Standard:        ROTATE 2(3)HV-9235, Boric Acid Makeup Tank 2(3)T072 Gravity Feed to Charging Pump Suction ISO Valve manual handwheel in the CLOCKWISE direction until local position indication is 0%.
Examiner Cue:      HV-9235, BAMU Tank T-072 Gravity Feed Valve is closed.
Comment:                                                        SAT      UNSAT Perform Step: 13 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:
* CLOSE BAMU Tank, 2MT-071, Gravity Feed Valve, 2HV-9240.
Standard:        ROTATE 2(3)HV-9240, Boric Acid Makeup Tank 2(3)T071 Gravity Feed to Charging Pump Suction ISO Valve manual handwheel in the CLOCKWISE direction and DEPRESS manual clutch lever while turning to engage the handwheel.
Comment:                                                         SAT      UNSAT Page 5 of 7            SONGS Oct 2009 NRC JPM P-2 Rev 0.doc


Unit 3.
Appendix C                           JPM STEPS                              Form ES-C-1 Perform Step: 14 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:
Appendix C JPM WORKSHEET Form ES-C-1 Page 1 of 10 SONGS Oct 2009 NRC JPM P-3 Rev 0.doc         Facility: SONGS JPM # RO/SRO NRC P-3 Task #190621 K/A #012 A2.06  4.4/4.7  SF-7Title: Radiation Control Area Entry and Locally Open the Reactor Trip Breakers Examinee (Print):
* CLOSE BAMU Tank, 2MT-071, Gravity Feed Valve, 2HV-9240.
Testing Method:
Standard:         OBSERVE 2(3)HV-9240, Boric Acid Makeup Tank 2(3)T071 Gravity Feed to Charging Pump Suction ISO Valve for inward stem motion and RELEASE manual clutch lever when motion is observed.
Simulated Performance:   X  Classroom:   Actual Performance:  Simulator:
Examiner Cue:     HV-9240, BAMU Tank T-071 Gravity Feed Valve is moving in the close direction.
Plant:  X READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue. When you complete the task successfully, the objective for this JPM will be satisfied.
Comment:                                                         SAT      UNSAT Perform Step: 15 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:
Initial Conditions: Given the following conditions: A transient is occurring on Unit 2 (Unit 3). Extra assistance is required in the Radiation Control Area at the Radwaste Control Room.
* CLOSE BAMU Tank, 2MT-071, Gravity Feed Valve, 2HV-9240.
Initiating Cue: The Control Room Supervisor DIRECTS you to:  LOG onto an appropriate Radiation Exposure Permit and PROCEED to the Radwaste Control Room.
Standard:        ROTATE 2(3)HV-9240, Boric Acid Makeup Tank 2(3)T071 Gravity Feed to Charging Pump Suction ISO Valve manual handwheel in the CLOCKWISE direction until local position indication is 0%.
Task Standard: Locate and correctly perform Critical Steps of SO123-VII-20 and SO23-12-1.
Examiner Cue:      BAMU Tank T-071 Gravity Feed Valve is closed.
Perform Step: 16  Notify the Unit 2 CRS of transfer to RWST Standard:         REPORT to the Unit 2 (Unit 3) Control Room Supervisor that Charging Pump suctions are aligned to the Refueling Water Storage Tank.
Terminating Cue: The Control Room Supervisor acknowledges that Charging Pump suctions are aligned to the Refueling Water Storage Tank. This JPM is complete.
STOP TIME:
Page 6 of 7            SONGS Oct 2009 NRC JPM P-2 Rev 0.doc


Required Materials: SO123-VII-20, Health Physics Program, Rev. 13. SO23-12-1, Standard Post Trip Actions, Rev. 21.
Appendix C                      JPM CUE SHEET                        Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:
Validation Time:  5 minutes Time Critical: 8 minutesCompletion Time: ________ minutes
* The Control Room has been evacuated per SO23-13-2, Shutdown From Outside the Control Room and a cooldown to Cold Shutdown is in progress.
* The Boric Acid Makeup (BAMU) Tanks are aligned for gravity feed on Unit 2 (Unit 3).
INITIATING CUE:    The Control Room Supervisor directs you to MONITOR BAMU Tank levels and when required, SHIFT Charging Pump suction to the Refueling Water Storage Tank per SO23-13-2, Shutdown From Outside the Control Room:
* Attachment 10, Radwaste Operator Duties for Unit 2.
* Attachment 11, Auxiliary Primary Operator Duties for Unit 3.
Page 7 of 7        SONGS Oct 2009 NRC JPM P-2 Rev 0.doc


Comments:  Result:  SAT  UNSAT  Examiner (Print / Sign):  Date:
Appendix C                                   JPM WORKSHEET                                   Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC P-3               Task #190621      K/A #012 A2.06      4.4/4.7      SF-7
Appendix C JPM WORKSHEET Form ES-C-1 Page 2 of 10 SONGS Oct 2009 NRC JPM P-3 Rev 0.doc PLANT SETUP


EXAMINER: PROVIDE the examinee with a copy of: No procedural guidance is provided for this task.
==Title:==
EXAMINER NOTE
Radiation Control Area Entry and Locally Open the Reactor Trip Breakers Examinee (Print):
: This JPM can be performed on either Unit. CIRCLE the Unit on which the JPM is to be performed on the JPM Worksheet and the JPM Cue Sheet. This JPM includes an evaluation of entry into the RCA. The examinee will perform the RCA entry and then be cued that local tripping of the Reactor Trip Breakers is required. The JPM is then temporarily suspended after tripping the Reactor Trip Breakers while the second RCA JPM is completed (P-2). Once JPM P-2 is finished, the Examiner will return to JPM P-3 and complete the RCA exit portion of this JPM. The TIME CRITICAL portion of the JPM starts when the 2 nd Cue Sheet has been read and understood by the examinee.
Testing Method:
Appendix C JPM STEPS Form ES-C-1 Page 3 of 10 SONGS Oct 2009 NRC JPM P-3 Rev 0.doc          - Check Mark Denotes Critical Step START TIME:
Simulated Performance:          X                            Classroom:
Perform Step: 1  Obtain a Thermo Luminescent Device (TLD).
Actual Performance:                                          Simulator:
Standard:
Plant:         X READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.
RETRIEVE Thermo Luminescent Detector (TLD) from the storage rack.
When you complete the task successfully, the objective for this JPM will be satisfied.
Comment: SAT      UNSAT      Perform Step: 2 Touch the login screen and scan ID badge and TLD.
Initial Conditions:     Given the following conditions:
Standard: TOUCH the login screen and SCAN ID badge and TLD.
* A transient is occurring on Unit 2 (Unit 3).
Comment: SAT      UNSAT      Perform Step: 3  Sign-in on an appropriate Radiation Exposure Permit.
* Extra assistance is required in the Radiation Control Area at the Radwaste Control Room.
Standard: DETERMINE an appropriate Operations Routine Radiation Exposure Permit (REP) to provide assistance in a Low Hazard Radiological Controlled Area (LHRCA) and SCAN the REP.
Initiating Cue:         The Control Room Supervisor DIRECTS you to:
Comment: SAT      UNSAT      Perform Step: 4 Log-in through the Routi ne RCA entry process. Obtain a Portable Electronic Dosimeter (PED).
* LOG onto an appropriate Radiation Exposure Permit and PROCEED to the Radwaste Control Room.
Standard:
Task Standard:           Locate and correctly perform Critical Steps of SO123-VII-20 and SO23-12-1.
SELECT a Portable Electronic Dosimeter (PED) from the storage rack at the RCA entry.
Required Materials: SO123-VII-20, Health Physics Program, Rev. 13.
Comment: SAT      UNSAT      Perform Step: 5  Log-in through the Routi ne RCA entry process. Set the PED onto the pad at the log-in station.
SO23-12-1, Standard Post Trip Actions, Rev. 21.
Standard:
Validation Time:          5 minutes    Time Critical: 8 minutes  Completion Time:   ________ minutes Comments:
SET the PED onto the pad at the log-in station.
Result:   SAT             UNSAT Examiner (Print / Sign):                                                           Date:
Comment: SAT     UNSAT     Perform Step: 6  Log-in through the Routi ne RCA entry process. Remove the PED and collect the printout.
Page 1 of 10                      SONGS Oct 2009 NRC JPM P-3 Rev 0.doc
Standard:
When prompted, REMOVE the PED and COLLECT the printout.
Comment: SAT      UNSAT     


Appendix C JPM STEPS Form ES-C-1 Page 4 of 10 SONGS Oct 2009 NRC JPM P-3 Rev 0.doc Perform Step: 7 Log-in through the Routi ne RCA entry process. Review printout for allowable dose, dose rate, and accessible areas. Standard: REVIEW printout for allowable dose, dose rate, and accessible areas. Examiner Cue:
Appendix C                           JPM WORKSHEET                          Form ES-C-1 PLANT SETUP EXAMINER:
Comment: SAT      UNSAT      Perform Step: 8 Transition to the HP Checkpoint to access the RCA Standard:
PROVIDE the examinee with a copy of:
TRANSITION to the HP Che ckpoint to access the RCA. Examiner Cue: Proceed to the Radwaste Control Room.
* No procedural guidance is provided for this task.
Comment: SAT      UNSAT      Examiner Cue: Remind the examinee to simulate all actions. Examiner Note: The required actions are performed without reference to a procedure and can be performed in any order. Examiner Cue: Hand examinee the 2 nd Cue Sheet and read it to them as follows:
EXAMINER NOTE:
The Unit 2 (Unit 3) Reactor h as received a trip signal and the Reactor Trip Breakers failed to open. The Control Room Supervisor DIRECTS you to PROCEED to the Reactor Trip Breaker Switchgear and locally OPEN Reactor Trip Circuit Breakers 1 through 8. Examiner Note: The TCBs can be opened in pairs using the Emergency Trip pushbuttons or individually using the Manual Trip pushbutton on each breaker. The first sequence of Steps (9-12) addresses use of the Emergency Trip pushbuttons. The second sequence of Steps (13-20) uses the individual Manual Trip pushbuttons. Examiner Note: This portion of the JPM is TIME CRITICAL.
This JPM can be performed on either Unit. CIRCLE the Unit on which the JPM is to be performed on the JPM Worksheet and the JPM Cue Sheet.
CRITICAL START TIME: 
* This JPM includes an evaluation of entry into the RCA. The examinee will perform the RCA entry and then be cued that local tripping of the Reactor Trip Breakers is required. The JPM is then temporarily suspended after tripping the Reactor Trip Breakers while the second RCA JPM is completed (P-2). Once JPM P-2 is finished, the Examiner will return to JPM P-3 and complete the RCA exit portion of this JPM.
* The TIME CRITICAL portion of the JPM starts when the 2nd Cue Sheet has been read and understood by the examinee.
Page 2 of 10              SONGS Oct 2009 NRC JPM P-3 Rev 0.doc


Appendix C JPM STEPS Form ES-C-1 Page 5 of 10 SONGS Oct 2009 NRC JPM P-3 Rev 0.doc Perform Step: 9  Open Reactor Trip Circuit Breakers TCB-1 and TCB-5.
Appendix C                           JPM STEPS                           Form ES-C-1
Standard:
- Check Mark Denotes Critical Step                    START TIME:
DEPRESS Emergency Trip pushbutton TCB-5 and TCB-1 (on TCB-5 cubicle) and OBSERVE green TRIPPED lights illuminate and mechanical indicators rotate to OPEN on TCB-1 and TCB-5. Examiner Cue: TCB-5 and TCB-1 green tripped lights are illuminated and mechanical indicators read open.
Perform Step: 1   Obtain a Thermo Luminescent Device (TLD).
Comment: SAT     UNSAT     Perform Step: 10   Open Reactor Trip Circuit Breakers TCB-2 and TCB-6.
Standard:         RETRIEVE Thermo Luminescent Detector (TLD) from the storage rack.
Standard:
Comment:                                                          SAT    UNSAT Perform Step: 2    Touch the login screen and scan ID badge and TLD.
DEPRESS Emergency Trip pushbutton TCB-6 and TCB-2 (on TCB-6 cubicle) and OBSERVE green TRIPPED lights illuminate and  
Standard:         TOUCH the login screen and SCAN ID badge and TLD.
Comment:                                                           SAT   UNSAT Perform Step: 3   Sign-in on an appropriate Radiation Exposure Permit.
Standard:          DETERMINE an appropriate Operations Routine Radiation Exposure Permit (REP) to provide assistance in a Low Hazard Radiological Controlled Area (LHRCA) and SCAN the REP.
Comment:                                                          SAT    UNSAT Perform Step: 4    Log-in through the Routine RCA entry process.
* Obtain a Portable Electronic Dosimeter (PED).
Standard:         SELECT a Portable Electronic Dosimeter (PED) from the storage rack at the RCA entry.
Comment:                                                          SAT    UNSAT Perform Step: 5  Log-in through the Routine RCA entry process.
* Set the PED onto the pad at the log-in station.
Standard:          SET the PED onto the pad at the log-in station.
Comment:                                                          SAT    UNSAT Perform Step: 6   Log-in through the Routine RCA entry process.
* Remove the PED and collect the printout.
Standard:          When prompted, REMOVE the PED and COLLECT the printout.
Comment:                                                          SAT    UNSAT Page 3 of 10            SONGS Oct 2009 NRC JPM P-3 Rev 0.doc


mechanical indicators rotate to OPEN on TCB-2 and 6 cubicles. Examiner Cue: TCB-6 and TCB-2 green tripped lights are illuminated and mechanical indicators read open.
Appendix C                          JPM STEPS                              Form ES-C-1 Perform Step: 7 Log-in through the Routine RCA entry process.
Comment: SAT     UNSAT     Perform Step: 11 Open Reactor Trip Circuit Breakers TCB-3 and TCB-7.
* Review printout for allowable dose, dose rate, and accessible areas.
Standard:
Standard:      REVIEW printout for allowable dose, dose rate, and accessible areas.
DEPRESS Emergency Trip pushbutton TCB-3 and TCB-7 (on TCB-3 cubicle) and OBSERVE green TRIPPED lights illuminate and
Examiner Cue:
Comment:                                                       SAT       UNSAT Perform Step: 8 Transition to the HP Checkpoint to access the RCA Standard:      TRANSITION to the HP Checkpoint to access the RCA.
Examiner Cue:  Proceed to the Radwaste Control Room.
Comment:                                                      SAT        UNSAT Examiner Cue:  Remind the examinee to simulate all actions.
Examiner Note: The required actions are performed without reference to a procedure and can be performed in any order.
Examiner Cue:  Hand examinee the 2nd Cue Sheet and read it to them as follows:
The Unit 2 (Unit 3) Reactor has received a trip signal and the Reactor Trip Breakers failed to open.
The Control Room Supervisor DIRECTS you to PROCEED to the Reactor Trip Breaker Switchgear and locally OPEN Reactor Trip Circuit Breakers 1 through 8.
Examiner Note: The TCBs can be opened in pairs using the Emergency Trip pushbuttons or individually using the Manual Trip pushbutton on each breaker. The first sequence of Steps (9-12) addresses use of the Emergency Trip pushbuttons. The second sequence of Steps (13-20) uses the individual Manual Trip pushbuttons.
Examiner Note:  This portion of the JPM is TIME CRITICAL.
CRITICAL START TIME:
Page 4 of 10        SONGS Oct 2009 NRC JPM P-3 Rev 0.doc


mechanical indicators rotate to OPEN on TCB-3 and 7 cubicles. Examiner Cue: TCB-3 and TCB-7 green tripped lights are illuminated and mechanical indicators read open.
Appendix C                            JPM STEPS                            Form ES-C-1 Perform Step: 9  Open Reactor Trip Circuit Breakers TCB-1 and TCB-5.
Comment: SAT      UNSAT     Perform Step: 12  Open Reactor Trip Circuit Breakers TCB-4 and TCB-8.
Standard:          DEPRESS Emergency Trip pushbutton TCB-5 and TCB-1 (on TCB-5 cubicle) and OBSERVE green TRIPPED lights illuminate and mechanical indicators rotate to OPEN on TCB-1 and TCB-5.
Standard:
Examiner Cue:      TCB-5 and TCB-1 green tripped lights are illuminated and mechanical indicators read open.
DEPRESS Emergency Trip push bu tton TCB-4 and TCB-8 (on TCB-4 cubicle) and OBSERVE green TRIPPED lights illuminate and  
Comment:                                                        SAT      UNSAT Perform Step: 10  Open Reactor Trip Circuit Breakers TCB-2 and TCB-6.
Standard:          DEPRESS Emergency Trip pushbutton TCB-6 and TCB-2 (on TCB-6 cubicle) and OBSERVE green TRIPPED lights illuminate and mechanical indicators rotate to OPEN on TCB-2 and 6 cubicles.
Examiner Cue:      TCB-6 and TCB-2 green tripped lights are illuminated and mechanical indicators read open.
Comment:                                                        SAT      UNSAT Perform Step: 11  Open Reactor Trip Circuit Breakers TCB-3 and TCB-7.
Standard:          DEPRESS Emergency Trip pushbutton TCB-3 and TCB-7 (on TCB-3 cubicle) and OBSERVE green TRIPPED lights illuminate and mechanical indicators rotate to OPEN on TCB-3 and 7 cubicles.
Examiner Cue:     TCB-3 and TCB-7 green tripped lights are illuminated and mechanical indicators read open.
Comment:                                                       SAT      UNSAT Perform Step: 12  Open Reactor Trip Circuit Breakers TCB-4 and TCB-8.
Standard:         DEPRESS Emergency Trip push button TCB-4 and TCB-8 (on TCB-4 cubicle) and OBSERVE green TRIPPED lights illuminate and mechanical indicators rotate to OPEN on TCB-4 and 8 cubicles.
Examiner Cue:      TCB-4 and TCB-8 green tripped lights are illuminated and mechanical indicators read open.
Examiner Note:    This ends the TIME CRITICAL clock if Sequence #1 was used.
Comment:                                                        SAT      UNSAT CRITICAL STOP TIME:
Page 5 of 10            SONGS Oct 2009 NRC JPM P-3 Rev 0.doc


mechanical indicators rotate to OPEN on TCB-4 and 8 cubicles. Examiner Cue: TCB-4 and TCB-8 green tripped lights are illuminated and mechanical indicators read open. Examiner Note: This ends the TIME CRITICAL clock if Sequence #1 was used.
Appendix C                           JPM STEPS                         Form ES-C-1 CRITICAL START TIME:
Comment: SAT      UNSAT      CRITICAL STOP TIME:
Examiner Note:     This portion of the JPM is TIME CRITICAL.
Appendix C JPM STEPS Form ES-C-1 Page 6 of 10 SONGS Oct 2009 NRC JPM P-3 Rev 0.doc CRITICAL START TIME:
Examiner Note:     Sequence #2 using the individual trip pushbutton on each breaker.
Examiner Note: This portion of the JPM is TIME CRITICAL. Examiner Note: Sequence #2 using the i ndividual trip pushbutton on each breaker.
Perform Step: 13  Open Reactor Trip Circuit Breaker TCB-1.
Perform Step: 13  Open Reactor Trip Circuit Breaker TCB-1.
Standard: PULL DOWN Plexiglas guard plat e and DEPRESS TC B-1 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and mechanical indicator rotate s to OPEN on TCB-1. Examiner Cue: TCB-1 green tripped light is illuminated and mechanical indicator reads OPEN.
Standard:         PULL DOWN Plexiglas guard plate and DEPRESS TCB-1 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and mechanical indicator rotates to OPEN on TCB-1.
Comment: SAT     UNSAT     Perform Step: 14  Open Reactor Trip Circuit Breaker TCB-2.
Examiner Cue:     TCB-1 green tripped light is illuminated and mechanical indicator reads OPEN.
Standard: PULL DOWN Plexiglas guard plat e and DEPRESS TC B-2 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and  
Comment:                                                       SAT     UNSAT Perform Step: 14  Open Reactor Trip Circuit Breaker TCB-2.
 
Standard:         PULL DOWN Plexiglas guard plate and DEPRESS TCB-2 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and mechanical indicator rotates to OPEN on TCB-2.
mechanical indicator rotate s to OPEN on TCB-2. Examiner Cue: TCB-2 green tripped light is illuminated and mechanical indicator reads OPEN.
Examiner Cue:     TCB-2 green tripped light is illuminated and mechanical indicator reads OPEN.
Comment: SAT     UNSAT     Perform Step: 15  Open Reactor Trip Circuit Breaker TCB-3.
Comment:                                                       SAT     UNSAT Perform Step: 15  Open Reactor Trip Circuit Breaker TCB-3.
Standard: PULL DOWN Plexiglas guard plat e and DEPRESS TC B-3 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and  
Standard:         PULL DOWN Plexiglas guard plate and DEPRESS TCB-3 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and mechanical indicator rotates to OPEN on TCB-3.
 
Examiner Cue:     TCB-3 green tripped light is illuminated and mechanical indicator reads OPEN.
mechanical indicator rotate s to OPEN on TCB-3. Examiner Cue: TCB-3 green tripped light is illuminated and mechanical indicator reads OPEN.
Comment:                                                       SAT     UNSAT Perform Step: 16  Open Reactor Trip Circuit Breaker TCB-4.
Comment: SAT     UNSAT     Perform Step: 16  Open Reactor Trip Circuit Breaker TCB-4.
Standard:         PULL DOWN Plexiglas guard plate and DEPRESS TCB-4 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and mechanical indicator rotates to OPEN on TCB-4.
Standard: PULL DOWN Plexiglas guard plat e and DEPRESS TC B-4 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and  
Examiner Cue:     TCB-4 green tripped light is illuminated and mechanical indicator reads OPEN.
 
Comment:                                                       SAT     UNSAT Page 6 of 10           SONGS Oct 2009 NRC JPM P-3 Rev 0.doc
mechanical indicator rotate s to OPEN on TCB-4. Examiner Cue: TCB-4 green tripped light is illuminated and mechanical indicator reads OPEN.
Comment: SAT     UNSAT Appendix C JPM STEPS Form ES-C-1 Page 7 of 10 SONGS Oct 2009 NRC JPM P-3 Rev 0.doc Perform Step: 17  Open Reactor Trip Circuit Breaker TCB-5.
Standard: PULL DOWN Plexiglas guard plat e and DEPRESS TC B-5 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and mechanical indicator rotate s to OPEN on TCB-5. Examiner Cue: TCB-5 green tripped light is illuminated and mechanical indicator reads OPEN.
Comment: SAT      UNSAT      Perform Step: 18  Open Reactor Trip Circuit Breaker TCB-6.
Standard: PULL DOWN Plexiglas guard plat e and DEPRESS TC B-6 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and
 
mechanical indicator rotate s to OPEN on TCB-6. Examiner Cue: TCB-6 green tripped light is illuminated and mechanical indicator reads OPEN.
Comment: SAT      UNSAT      Perform Step: 19  Open Reactor Trip Circuit Breaker TCB-7.
Standard: PULL DOWN Plexiglas guard plat e and DEPRESS TC B-7 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and


mechanical indicator rotate s to OPEN on TCB-7. Examiner Cue: TCB-7 green tripped light is illuminated and mechanical indicator reads OPEN.
Appendix C                            JPM STEPS                          Form ES-C-1 Perform Step: 17  Open Reactor Trip Circuit Breaker TCB-5.
Comment: SAT     UNSAT     Perform Step: 20   Open Reactor Trip Circuit Breaker TCB-8.
Standard:          PULL DOWN Plexiglas guard plate and DEPRESS TCB-5 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and mechanical indicator rotates to OPEN on TCB-5.
Standard: PULL DOWN Plexiglas guard plat e and DEPRESS TC B-8 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and  
Examiner Cue:      TCB-5 green tripped light is illuminated and mechanical indicator reads OPEN.
Comment:                                                        SAT    UNSAT Perform Step: 18  Open Reactor Trip Circuit Breaker TCB-6.
Standard:          PULL DOWN Plexiglas guard plate and DEPRESS TCB-6 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and mechanical indicator rotates to OPEN on TCB-6.
Examiner Cue:      TCB-6 green tripped light is illuminated and mechanical indicator reads OPEN.
Comment:                                                        SAT    UNSAT Perform Step: 19  Open Reactor Trip Circuit Breaker TCB-7.
Standard:          PULL DOWN Plexiglas guard plate and DEPRESS TCB-7 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and mechanical indicator rotates to OPEN on TCB-7.
Examiner Cue:     TCB-7 green tripped light is illuminated and mechanical indicator reads OPEN.
Comment:                                                       SAT     UNSAT Perform Step: 20 Open Reactor Trip Circuit Breaker TCB-8.
Standard:         PULL DOWN Plexiglas guard plate and DEPRESS TCB-8 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and mechanical indicator rotates to OPEN on TCB-8.
Examiner Cue:      TCB-8 green tripped light is illuminated and mechanical indicator reads OPEN.
Examiner Note:    This ends the TIME CRITICAL clock if Sequence #2 was used.
Comment:                                                        SAT    UNSAT CRITICAL STOP TIME:
Page 7 of 10            SONGS Oct 2009 NRC JPM P-3 Rev 0.doc


mechanical indicator rotate s to OPEN on TCB-8. Examiner Cue: TCB-8 green tripped light is illuminated and mechanical indicator reads OPEN. Examiner Note: This ends the TIME CRITICAL clock if Sequence #2 was used.
Appendix C                           JPM STEPS                           Form ES-C-1 Perform Step: 21 Exit the RCA:
Comment: SAT      UNSAT      CRITICAL STOP TIME:
* Set the PED onto the pad at the exit station.
Appendix C JPM STEPS Form ES-C-1 Page 8 of 10 SONGS Oct 2009 NRC JPM P-3 Rev 0.doc Perform Step: 21   Exit the RCA: Set the PED onto the pad at the exit station.
Standard:         SET the PED onto the pad at the exit station.
Standard:
Comment:                                                           SAT UNSAT Perform Step: 22  Exit the RCA:
SET the PED onto the pad at the exit station.
* Scan ID badge and TLD at the exit station.
Comment: SAT     UNSAT     Perform Step: 22  Exit the RCA: Scan ID badge and TLD at the exit station.
Standard:         SCAN ID badge and TLD at the exit station.
Standard: SCAN ID badge and TLD at the exit station.
Comment:                                                           SAT UNSAT Perform Step: 23   Exit the RCA:
Comment: SAT     UNSAT     Perform Step: 23 Exit the RCA: Review dose information and remo ve PED from the exit station pad. Standard:
* Review dose information and remove PED from the exit station pad.
REVIEW dose information and REMOVE PED from the exit station pad. Terminating Cue: This JPM is complete.
Standard:         REVIEW dose information and REMOVE PED from the exit station pad.
Comment: SAT     UNSAT       STOP TIME:
Terminating Cue:   This JPM is complete.
Appendix C JPM CUE SHEET Form ES-C-1 Page 9 of 10 SONGS Oct 2009 NRC JPM P-3 Rev 0.doc CUE SHEET #1 INITIAL CONDITIONS: Given the following conditions:  A transient is occurring on Unit 2 (Unit 3). Extra assistance is required in the Radiation Control Area at the Radwaste Control Room.
Comment:                                                           SAT UNSAT STOP TIME:
Page 8 of 10             SONGS Oct 2009 NRC JPM P-3 Rev 0.doc


INITIATING CUE: The Control Room Supervisor DIRECTS you to: LOG onto an appropriate Radiation Exposure Permit and PROCEED to the Radwaste Control Panel.  
Appendix C                    JPM CUE SHEET                          Form ES-C-1 CUE SHEET #1 INITIAL CONDITIONS: Given the following conditions:
* A transient is occurring on Unit 2 (Unit 3).
* Extra assistance is required in the Radiation Control Area at the Radwaste Control Room.
INITIATING CUE:     The Control Room Supervisor DIRECTS you to:
* LOG onto an appropriate Radiation Exposure Permit and PROCEED to the Radwaste Control Panel.
Page 9 of 10        SONGS Oct 2009 NRC JPM P-3 Rev 0.doc


Appendix C JPM CUE SHEET Form ES-C-1 Page 10 of 10 SONGS Oct 2009 NRC JPM P-3 Rev 0.doc CUE SHEET #2 INITIAL CONDITIONS: The Unit 2 (Unit 3) Reactor h as received a trip signal and the Reactor Trip Breakers failed to open.  
Appendix C                     JPM CUE SHEET                           Form ES-C-1 CUE SHEET #2 INITIAL CONDITIONS: The Unit 2 (Unit 3) Reactor has received a trip signal and the Reactor Trip Breakers failed to open.
INITIATING CUE:    The Control Room Supervisor DIRECTS you to:
* PROCEED to the Reactor Trip Breaker Switchgear and locally OPEN Reactor Trip Circuit Breakers 1 through 8.
THIS IS A TIME CRITICAL JPM Page 10 of 10      SONGS Oct 2009 NRC JPM P-3 Rev 0.doc


INITIATING CUE: The Control Room Supervisor DIRECTS you to:  PROCEED to the Reactor Trip Breaker Switchgear and locally OPEN Reactor Trip Circuit Breakers 1 through 8.
Appendix C                                    JPM WORKSHEET                                  Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC S-1                Task #187757      K/A #001.A2.11      4.4 / 4.7    SF-1
THIS IS A TIME CRITICAL JPM


Appendix C JPM WORKSHEET Form ES-C-1 Page 1 of 6 SONGS Oct 2009 NRC JPM S-1 Rev 0.doc        Facility: SONGS JPM # RO/SRO NRC S-1 Task #187757 K/A #001.A2.11  4.4 / 4.7  SF-1Title: Immediate Actions for Control Room Evacuation Examinee (Print):
==Title:==
Immediate Actions for Control Room Evacuation Examinee (Print):
Testing Method:
Testing Method:
Simulated Performance:   Classroom:   Actual Performance: X Simulator: X Plant:   READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue. When you complete the task successfully, the objective for this JPM will be satisfied.
Simulated Performance:                                       Classroom:
Initial Conditions: The following condi tions exist in Units 2 and 3: A spill of a liquid has occurred resulting in toxic fumes in both Control Rooms. The Shift Manager has directed that both Control Rooms be evacuated.
Actual Performance:             X                           Simulator:     X Plant:
Initiating Cue: The Control Room Supervisor directs you to PERFORM the Unit 2 Immediate Actions for evacuating the Control Room per SO23-13-2, Shutdown from Outside the Control Room.
READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.
Task Standard: Locate and correctly perform Critical Steps of SO23-13-2.
When you complete the task successfully, the objective for this JPM will be satisfied.
 
Initial Conditions:     The following conditions exist in Units 2 and 3:
* A spill of a liquid has occurred resulting in toxic fumes in both Control Rooms.
* The Shift Manager has directed that both Control Rooms be evacuated.
Initiating Cue:         The Control Room Supervisor directs you to PERFORM the Unit 2 Immediate Actions for evacuating the Control Room per SO23-13-2, Shutdown from Outside the Control Room.
Task Standard:           Locate and correctly perform Critical Steps of SO23-13-2.
Required Materials: SO23-13-2, Shutdown from Outside the Control Room, Rev. 11.
Required Materials: SO23-13-2, Shutdown from Outside the Control Room, Rev. 11.
Validation Time: 4 minutes Time Critical: N/A Completion Time: ________ minutes  
Validation Time:         4 minutes     Time Critical: N/A     Completion Time:   ________ minutes Comments:
Result:  SAT            UNSAT Examiner (Print / Sign):                                                          Date:
Page 1 of 6                      SONGS Oct 2009 NRC JPM S-1 Rev 0.doc


Comments:  Result:  SAT  UNSAT  Examiner (Print / Sign):  Date:
Appendix C                       JPM WORKSHEET                         Form ES-C-1 SIMULATOR SETUP MACHINE OPERATOR:
Appendix C JPM WORKSHEET Form ES-C-1 Page 2 of 6 SONGS Oct 2009 NRC JPM S-1 Rev 0.doc SIMULATOR SETUP
INITIALIZE to IC#231 or any MODE 1 Initial Condition and PERFORM the following:
* INSERT Override 2HS-9163A-CR56-S02, STOP pushbutton stuck out on RCP P-002.
EXAMINER:
When immediate actions are complete, PROVIDE the examinee with a copy of:
* SO23-13-2 Shutdown from Outside the Control Room.
Page 2 of 6             SONGS Oct 2009 NRC JPM S-1 Rev 0.doc


MACHINE OPERATOR
Appendix C                            JPM STEPS                            Form ES-C-1
: INITIALIZE to IC#231 or any MODE 1 Initial Condition and PERFORM the following:  INSERT Override 2HS-9163A-CR56-S02, STOP pushbutton stuck out on RCP P-002.
- Check Mark Denotes Critical Step                  START TIME:
Perform Step: 1  MANUALLY Trip the Reactor from either set of Manual Trip Pushbuttons.
Standard:          DEPRESS 2HS-9132-1, Reactor Trip 1 and 2HS-9132-4, Reactor Trip 4 red pushbuttons (CR-52) or DEPRESS 2HS-9132-2, Reactor Trip 2 and 2HS-9132-3, Reactor Trip 3 red pushbuttons (CR-56).
Comment:                                                        SAT      UNSAT Perform Step: 2    VERIFY all CEAs fully inserted and Neutron Power lowering.
Standard:          VERIFY all CEAs fully inserted by OBSERVING rod bottom lights illuminated on 2ZI-9131, CEA Bottom Indication (Core Mimic) and/or OBSERVING CEAs fully inserted on 2ZI-9133, Secondary Rod Position (CEAC Display CRT).
Comment:                                                        SAT      UNSAT Perform Step: 3    VERIFY all CEAs fully inserted and Neutron Power lowering.
Standard:          VERIFY Neutron Power lowering by OBSERVING any of the following:
* 2JI-0006B1 SU Channel 1 Percent Power indication LOWERING
* 2JI-0005B2 SU Channel 2 Percent Power indication LOWERING
* 2JI-9153-1 Startup Rate Channel 1 NEGATIVE
* 2JI-9153-2 Startup Rate Channel 2 NEGATIVE Comment:                                                        SAT      UNSAT Perform Step: 4   MANUALLY Initiate MSIS from either set of Manual Initiation Pushbuttons.
Standard:          DEPRESS 2HS-9137-1 and 9137-2, MSIS Manual Initiation pushbuttons (CR-56) or DEPRESS 2HS-9137-3 and 9137-4, MSIS Manual Initiation pushbuttons (CR-53) and OBSERVE Annunciators 57A4(B4) - MSIS TRAIN A(B) ACTUATION.
Comment:                                                        SAT      UNSAT Page 3 of 6              SONGS Oct 2009 NRC JPM S-1 Rev 0.doc


EXAMINER: When immediate actions are complete, PROVIDE the examinee with a copy ofSO23-13-2 Shutdown from Outside the Control Room.  
Appendix C                            JPM STEPS                            Form ES-C-1 Examiner Note:    Charging Pumps may be stopped in any order.
Perform Step: 5a STOP all Charging Pumps and REMOVE FROM AUTO.
Standard:        DEPRESS 2P190, Charging Pump STOP pushbutton and OBSERVE green STOP light illuminated and white AUTO light extinguished.
Comment:                                                      SAT        UNSAT Perform Step: 5b STOP all Charging Pumps and REMOVE FROM AUTO.
Standard:        DEPRESS 2P191, Charging Pump STOP pushbutton and OBSERVE green STOP light illuminated and white AUTO light extinguished.
Comment:                                                      SAT        UNSAT Perform Step: 5c STOP all Charging Pumps and REMOVE FROM AUTO.
Standard:         DEPRESS 2P192, Charging Pump STOP pushbutton and OBSERVE green STOP light illuminated and white AUTO light extinguished.
Comment:                                                      SAT        UNSAT Examiner Note:    Reactor Coolant Pumps may be stopped in any order.
Perform Step: 6 STOP all RCPs from Control Handswitches OR by selecting the 6.9 kV Buses to MANUAL and Opening all Feeder Breakers.
* RCP P-001 Standard:        DEPRESS 2HS-9160A, RCP 2P001 STOP pushbutton and OBSERVE green STOP light illuminated and ammeter at zero (0) amps.
Comment:                                                      SAT        UNSAT Perform Step: 7  STOP all RCPs from Control Handswitches OR by selecting the 6.9 kV Buses to MANUAL and Opening all Feeder Breakers.
* RCP P-003 Standard:        DEPRESS 2HS-9161A, RCP 2P003 STOP pushbutton and OBSERVE green STOP light illuminated and ammeter at zero (0) amps.
Comment:                                                      SAT        UNSAT Page 4 of 6            SONGS Oct 2009 NRC JPM S-1 Rev 0.doc


Appendix C JPM STEPS Form ES-C-1 Page 3 of 6 SONGS Oct 2009 NRC JPM S-1 Rev 0.doc        - Check Mark Denotes Critical Step START TIME:
Appendix C                           JPM STEPS                           Form ES-C-1 Examiner Note:   The following steps represent the alternate path for this JPM.
Perform Step: 1 MANUALLY Trip the Reactor from either set of Manual Trip Pushbuttons.
Perform Step: 8 STOP all RCPs from Control Handswitches OR by selecting the 6.9 kV Buses to MANUAL and Opening all Feeder Breakers.
Standard:
* RCP P-004 Standard:         DEPRESS 2HS-9162A, RCP 2P004 STOP pushbutton and OBSERVE green STOP light illuminated and ammeter at zero (0) amps.
DEPRESS 2HS-9132-1, Reactor Trip 1 and 2HS-9132-4, Reactor Trip 4 red pushbuttons (CR-52) or DEPRESS 2HS-9132-2, Reactor Trip 2 and 2HS-9132-3, Reactor Trip 3 red pushbuttons (CR-56).
Comment:                                                       SAT       UNSAT Perform Step: STOP all RCPs from Control Handswitches OR by selecting the 6.9 kV Buses to MANUAL and Opening all Feeder Breakers.
Comment: SAT      UNSAT      Perform Step: 2 VERIFY all CEAs fully inserted and Neutron Power lowering.
* RCP P-002 Standard:         DEPRESS 2HS-9163A, RCP 2P002 STOP pushbutton and OBSERVE red START light illuminated and DETERMINE 2P002 will NOT trip.
Standard: VERIFY all CEAs fully inserted by OBSERVING rod bottom lights illuminated on 2ZI-9131, CEA Bottom I ndication (Core Mimic) and/or OBSERVING CEAs fully inserted on 2ZI-9133, Secondary Rod Position (CEAC Display CRT).
Comment:                                                       SAT       UNSAT Perform Step: 10 STOP all RCPs from Control Handswitches OR by selecting the 6.9 kV Buses to MANUAL and Opening all Feeder Breakers.
Comment: SAT      UNSAT      Perform Step: 3  VERIFY all CEAs fully inserted and Neutron Power lowering.
* RCP P-002 Standard:         DEPRESS 2HS-1610B, RES AUX XFMR 2XR3 FDR BKR 2A0202 MODE SELECTOR MANUAL pushbutton and OBSERVE blue MANUAL light illuminated.
Standard: VERIFY Neutron Power lowering by OBSERVING any of the following:  2JI-0006B1 SU Channel 1 Percent Power indication LOWERING  2JI-0005B2 SU Channel 2 Percent Power indication LOWERING  2JI-9153-1 Startup Ra te Channel 1 NEGATIVE  2JI-9153-2 Startup Ra te Channel 2 NEGATIVE Comment: SAT      UNSAT      Perform Step: 4 MANUALLY Initiate MSIS from ei ther set of Manual Initiation Pushbuttons.
Comment:                                                       SAT       UNSAT Perform Step: 11 STOP all RCPs from Control Handswitches OR by selecting the 6.9 kV Buses to MANUAL and Opening all Feeder Breakers.
Standard:
* RCP P-002 Standard:         DEPRESS 2HS-1610, RES AUX XFMR 2XR3 FDR BKR 2A0202 TRIP pushbutton and OBSERVE green TRIP light illuminated.
DEPRESS 2HS-9137-1 and 9137-2, MSIS Manual Initiation pushbuttons (CR-56) or DEPRESS 2HS-9137-3 and 9137-4, MSIS Manual Initiation pushbuttons (CR-53) and OBSERVE Annunciators 57A4(B4) - MSIS TRAIN A(B) ACTUATION.
Terminating Cue:  This JPM is complete.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 4 of 6 SONGS Oct 2009 NRC JPM S-1 Rev 0.doc        Examiner Note: Charging Pumps may be stopped in any order.
Comment:                                                       SAT       UNSAT STOP TIME:
Perform Step: 5a STOP all Charging Pumps and REMOVE FROM AUTO.
Page 5 of 6             SONGS Oct 2009 NRC JPM S-1 Rev 0.doc
Standard: DEPRESS 2P190, Charging Pump STOP pushbutton and OBSERVE green STOP light illuminated and white AUTO light extinguished.
Comment: SAT      UNSAT      Perform Step: 5b STOP all Charging Pumps and REMOVE FROM AUTO.
Standard: DEPRESS 2P191, Charging Pump STOP pushbutton and OBSERVE green STOP light illuminated and white AUTO light extinguished.
Comment: SAT      UNSAT      Perform Step: 5c STOP all Charging Pumps and REMOVE FROM AUTO.
Standard: DEPRESS 2P192, Charging Pump STOP pushbutton and OBSERVE green STOP light illuminated and white AUTO light extinguished.
Comment: SAT      UNSAT      Examiner Note: Reactor Coolant Pumps may be stopped in any order.
Perform Step: 6 STOP all RCPs from Control Handswitches OR by selecting the 6.9 kV Buses to MANUAL and Opening all Feeder Breakers. RCP P-001 Standard:
DEPRESS 2HS-9160A, RCP 2P001 STOP pushbutton and OBSERVE green STOP light illuminated and ammeter at zero (0) amps.
Comment: SAT     UNSAT     Perform Step: 7 STOP all RCPs from Control Handswitches OR by selecting the 6.9 kV Buses to MANUAL and Opening all Feeder Breakers. RCP P-003 Standard:
DEPRESS 2HS-9161A, RCP 2P003 STOP pushbutton and OBSERVE green STOP light illuminated and ammeter at zero (0) amps.
Comment: SAT     UNSAT Appendix C JPM STEPS Form ES-C-1 Page 5 of 6 SONGS Oct 2009 NRC JPM S-1 Rev 0.doc        Examiner Note: The following steps represen t the alternate path for this JPM.
Perform Step: 8 STOP all RCPs from Control Handswitches OR by selecting the 6.9 kV Buses to MANUAL and Opening all Feeder Breakers. RCP P-004 Standard:
DEPRESS 2HS-9162A, RCP 2P004 STOP pushbutton and OBSERVE green STOP light illuminated and ammeter at zero (0) amps.
Comment: SAT     UNSAT     Perform Step: 9 STOP all RCPs from Control Handswitches OR by selecting the 6.9 kV Buses to MANUAL and Opening all Feeder Breakers. RCP P-002 Standard:
DEPRESS 2HS-9163A, RCP 2P002 STOP pushbutton and OBSERVE red START light illuminated and DE TERMINE 2P002 will NOT trip.
Comment: SAT     UNSAT     Perform Step: 10 STOP all RCPs from Control Handswitches OR by selecting the 6.9 kV Buses to MANUAL and Opening all Feeder Breakers. RCP P-002 Standard: DEPRESS 2HS-1610B, RES AUX XFMR 2XR3 FDR BKR 2A0202


MODE SELECTOR MANUAL pushbu tton and OBSERVE blue MANUAL light illuminated.
Appendix C                     JPM CUE SHEET                           Form ES-C-1 INITIAL CONDITIONS: The following conditions exist in Units 2 and 3:
Comment: SAT      UNSAT      Perform Step: 11 STOP all RCPs from Control Handswitches OR by selecting the 6.9 kV Buses to MANUAL and Opening all Feeder Breakers. RCP P-002 Standard: DEPRESS 2HS-1610, RES AUX XFMR 2XR3 FDR BKR 2A0202 TRIP pushbutton and OBSERVE green TRIP light illuminated. Terminating Cue: This JPM is complete.
* A spill of a liquid has occurred resulting in toxic fumes in both Control Rooms.
Comment: SAT      UNSAT      STOP TIME:
* The Shift Manager has directed that both Control Rooms be evacuated.
Appendix C JPM CUE SHEET Form ES-C-1 Page 6 of 6 SONGS Oct 2009 NRC JPM S-1 Rev 0.doc INITIAL CONDITIONS: The following conditions exist in Units 2 and 3: A spill of a liquid has occurred resulting in toxic fumes in both Control Rooms. The Shift Manager has directed that both Control Rooms be evacuated.  
INITIATING CUE:    The Control Room Supervisor directs you to PERFORM the Unit 2 Immediate Actions for evacuating the Control Room per SO23-13-2, Shutdown from Outside the Control Room.
Page 6 of 6        SONGS Oct 2009 NRC JPM S-1 Rev 0.doc


INITIATING CUE: The Control Room Supervisor directs you to PERFORM the Unit 2 Immediate Actions for evacuating the Control Room per SO23-13-2, Shutdown from Outside the Control Room.
Appendix C                                    JPM WORKSHEET                                  Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC S-2               Task #141241      K/A #004.A4.06      3.6 / 3.1    SF-2


Appendix C JPM WORKSHEET Form ES-C-1 Page 1 of 6 SONGS Oct 2009 NRC JPM S-2 Rev 0.doc        Facility: SONGS JPM # RO/SRO NRC S-2 Task #141241 K/A #004.A4.06  3.6 / 3.1  SF-2Title: Secure Charging and Letdown Examinee (Print):
==Title:==
Secure Charging and Letdown Examinee (Print):
Testing Method:
Testing Method:
Simulated Performance:   Classroom:   Actual Performance: X Simulator: X Plant:   READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue. When you complete the task successfully, the objective for this JPM will be satisfied.
Simulated Performance:                                       Classroom:
Initial Conditions: The following conditions exist on Unit 2: Power is stable at 100%. The Reactor Coolant System leakrate is elevated but is not evident in the Containment. Steam Generator samples are less than Minimum Detectable Activity. A walkdown outside the Containment has not identified a leak source. The leakage source is suspected to be the Charging Pump.
Actual Performance:             X                           Simulator:     X Plant:
Management has given permission to secure Charging and Letdown to perform an RCS Inventory Balance.
READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.
Initiating Cue: The Control Room Supervi sor directs you to SECURE Charging and Letdown per SO23-3-2.1.2, CVCS Ou tage Evolutions, Section 6.2, Securing Charging and Letdown.
When you complete the task successfully, the objective for this JPM will be satisfied.
Task Standard: Locate and correctly perform Critical Steps of SO23-3-2.1.2.
Initial Conditions:     The following conditions exist on Unit 2:
* Power is stable at 100%.
* The Reactor Coolant System leakrate is elevated but is not evident in the Containment.
* Steam Generator samples are less than Minimum Detectable Activity.
* A walkdown outside the Containment has not identified a leak source.
* The leakage source is suspected to be the Charging Pump.
* Management has given permission to secure Charging and Letdown to perform an RCS Inventory Balance.
Initiating Cue:         The Control Room Supervisor directs you to SECURE Charging and Letdown per SO23-3-2.1.2, CVCS Outage Evolutions, Section 6.2, Securing Charging and Letdown.
Task Standard:           Locate and correctly perform Critical Steps of SO23-3-2.1.2.
Required Materials: SO23-3-2.1.2, CVCS Outage Evolutions, Rev 4.
Required Materials: SO23-3-2.1.2, CVCS Outage Evolutions, Rev 4.
Validation Time: 10 minutes Time Critical: N/A Completion Time: ________ minutes Comments:   Result: SAT UNSAT   Examiner (Print / Sign): Date:
Validation Time:         10 minutes     Time Critical: N/A   Completion Time:   ________ minutes Comments:
Result:   SAT             UNSAT Examiner (Print / Sign):                                                           Date:
Page 1 of 6                      SONGS Oct 2009 NRC JPM S-2 Rev 0.doc


Appendix C JPM WORKSHEET Form ES-C-1 Page 2 of 6 SONGS Oct 2009 NRC JPM S-2 Rev 0.doc SIMULATOR SETUP
Appendix C                         JPM WORKSHEET                         Form ES-C-1 SIMULATOR SETUP MACHINE OPERATOR:
INITIALIZE to IC#232 or any 100% power Initial Condition and PERFORM the following:
* ENSURE Pressurizer level is normal for 100% power.
* ENSURE 2HIC-0110A, Flow Control is in service.
* ENSURE 2PIC-0201A, Back Pressure Control is in service.
* ENSURE 2P-191, Charging Pump is the operating pump.
PERFORM the following after each JPM:
* RESET the Simulator to ENSURE proper operation of 2TV-0224B, CVCS IX Bypass Valve.
EXAMINER:
PROVIDE the examinee with a copy of:
* SO23-3-2.1.2, CVCS Outage Evolutions.
* INITIAL Sections 6.1 and 6.3 N/A and remove all Attachments.
Page 2 of 6               SONGS Oct 2009 NRC JPM S-2 Rev 0.doc


MACHINE OPERATOR
Appendix C                            JPM STEPS                            Form ES-C-1
: INITIALIZE to IC#232 or any 100% power In itial Condition and PERFORM the following: ENSURE Pressurizer level is normal for 100% power. ENSURE 2HIC-0110A, Flow Control is in service. ENSURE 2PIC-0201A, Back Pressure Control is in service. ENSURE 2P-191, Charging Pump is the operating pump.  
- Check Mark Denotes Critical Step                  START TIME:
Perform Step: 1    If at power, then ADJUST Pressurizer Level to 41%-54%.
Standard:         DETERMINE that Pressurizer level is within the band of 41%-54% by OBSERVING 2LI-0110A1 and 2LI-0110A2, Hot Calibrated Pressurizer Level instruments.
Comment:                                                        SAT      UNSAT Perform Step: 2  SELECT TV-0224B, CVCS IX Bypass, to MANUAL, then PLACE in BYPASS.
Standard:          DEPRESS 2TV-0224B, Ion Exchangers Bypass Valve MANUAL pushbutton and OBSERVE blue MANUAL and red BYPASS lights illuminated with green ION EXCH and white AUTO lights extinguished.
Comment:                                                        SAT      UNSAT Perform Step: 3  CLOSE TV-0224A, Boronometer Isolation.
Standard:          DEPRESS 2TV-0224A, Boronometer Iso Valve CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished.
Comment:                                                        SAT      UNSAT Perform Step: 4  PLACE the in-service HIC-0110A and/or HIC-0110B Letdown Flow Controller to MANUAL and LOWER output to zero (valves full closed).
Standard:          DEPRESS 2HIC-0110A, Flow Control Auto-Manual Selector Switch A/M pushbutton ONCE and OBSERVE M light illuminated.
Comment:                                                        SAT      UNSAT Perform Step: 5  PLACE the in-service HIC-0110A and/or HIC-0110B Letdown Flow Controller to MANUAL and LOWER output to zero (valves full closed).
Standard:          DEPRESS 2HIC-0110A, Flow Control SEL pushbutton until OUT is displayed.
Comment:                                                        SAT      UNSAT Page 3 of 6              SONGS Oct 2009 NRC JPM S-2 Rev 0.doc


PERFORM the following after each JPM:  RESET the Simulator to ENSURE proper operation of 2TV-0224B, CVCS IX Bypass Valve.
Appendix C                          JPM STEPS                            Form ES-C-1 Perform Step: 6 PLACE the in-service HIC-0110A and/or HIC-0110B Letdown Flow Controller to MANUAL and LOWER output to zero (valves full closed).
EXAMINER: PROVIDE the examinee with a copy of: SO23-3-2.1.2, CVCS Outage Evolutions. INITIAL Sections 6.1 and 6.3 N/
Standard:        DEPRESS 2HIC-0110A, Flow Control LOWER pushbutton () until OUTPUT is zero (0).
A and remove all Attachments.  
Comment:                                                      SAT      UNSAT Examiner Note    Only one of the following four sub-steps is considered critical. One Letdown Isolation Valve closed satisfies the required action.
Perform Step: 7a CLOSE the following Letdown valves:
* TV-0221, Letdown Temperature Isolation.
Standard:        DEPRESS 2TV-0221, Regen HX Inlet ISO Valve CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished.
Comment:                                                       SAT      UNSAT Perform Step: 7b CLOSE the following Letdown valves:
* HV-9204, Letdown to Regen Heat Exchanger Isolation.
Standard:        DEPRESS 2HV-9204, Regen HX Inlet ISO Valve CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished.
Comment:                                                      SAT      UNSAT Perform Step: 7c CLOSE the following Letdown valves:
* TV-9267, Letdown Heat Exchanger Outlet.
Standard:        DEPRESS 2TV-9267, Regen HX Outlet ISO Valve CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished.
Comment:                                                      SAT      UNSAT Page 4 of 6            SONGS Oct 2009 NRC JPM S-2 Rev 0.doc


Appendix C JPM STEPS Form ES-C-1 Page 3 of 6 SONGS Oct 2009 NRC JPM S-2 Rev 0.doc        - Check Mark Denotes Critical Step START TIME:
Appendix C                           JPM STEPS                           Form ES-C-1 Perform Step: 7d CLOSE the following Letdown valves:
Perform Step: 1 If at power, then ADJUST Pressurizer Level to 41%-54%.
* HV-9205, Letdown Containment Isolation.
Standard:
Standard:         DEPRESS 2HV-9205, Regen HX Outlet ISO Valve CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished.
DETERMINE that Pressurizer level is within the band of 41%-54% by OBSERVING 2LI-0110A1 and 2LI-0110A2, Hot Calibrated Pressurizer Level instruments.
Comment:                                                       SAT       UNSAT Perform Step: 8a PLACE backup Charging Pump(s) to STOP.
Comment: SAT      UNSAT      Perform Step: 2 SELECT TV-0224B, CVCS IX Bypass, to MANUAL, then PLACE in BYPASS. Standard: DEPRESS 2TV-0224B, Ion Exchangers Bypass Valve MANUAL pushbutton and OBSERVE blue MANUAL and red BYPASS lights illuminated with green ION EXCH and white AUTO lights extinguished.
Standard:         DEPRESS 2P-190, Charging Pump STOP pushbutton and OBSERVE green STOP light illuminated and white AUTO light extinguished.
Comment: SAT      UNSAT      Perform Step: 3 CLOSE TV-0224A, Boronom eter Isolation.
Comment:                                                       SAT       UNSAT Perform Step: 8b PLACE backup Charging Pump(s) to STOP.
Standard:
Standard:         DEPRESS 2P-192, Charging Pump STOP pushbutton and OBSERVE green STOP light illuminated and white AUTO light extinguished.
DEPRESS 2TV-0224A, Boronometer Iso Valve CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished.
Comment:                                                       SAT       UNSAT Perform Step: 8c STOP operating Charging Pump(s).
Comment: SAT      UNSAT      Perform Step: 4 PLACE the in-service HIC-0110A and/or HIC-0110B Letdown Flow Controller to MANUAL and LOWER output to zero (valves full closed).
Standard:         DEPRESS 2P-191, Charging Pump STOP pushbutton and OBSERVE green STOP light illuminated and white AUTO light extinguished.
Standard:
Comment:                                                       SAT       UNSAT Perform Step: 9   LOWER PIC-0201A or B Setpoint for the in-service Letdown Backpressure Controller to < 165 psig.
DEPRESS 2HIC-0110A, Flow Control Auto-Manual Selector Switch A/M pushbutton ONCE and OBSERVE "M" light illuminated.
Standard:         DEPRESS 2PIC-0201B, Backpressure Control SEL pushbutton until OSP is observed then DEPRESS LOWER pushbutton () until setpoint is less than 165 psig as read on 2PIC-0201B.
Comment: SAT      UNSAT      Perform Step: 5 PLACE the in-service HIC-0110A and/or HIC-0110B Letdown Flow Controller to MANUAL and LOWER output to zero (valves full closed).
Terminating Cue: This JPM is complete.
Standard:
Comment:                                                       SAT       UNSAT STOP TIME:
DEPRESS 2HIC-0110A, Flow Cont rol SEL pushbutton until OUT is displayed.
Page 5 of 6             SONGS Oct 2009 NRC JPM S-2 Rev 0.doc
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 4 of 6 SONGS Oct 2009 NRC JPM S-2 Rev 0.doc Perform Step: 6 PLACE the in-service HIC-0110A and/or HIC-0110B Letdown Flow Controller to MANUAL and LOWER output to zero (valves full closed).
Standard:
DEPRESS 2HIC-0110A, Flow Control LOWER pushbutton () until OUTPUT is zero (0).
Comment: SAT      UNSAT      Examiner Note Only one of the following four sub-steps is considered critical. One Letdown Isolation Valve closed satisfies the required action.
Perform Step: 7a  CLOSE the following Letdown valves:  TV-0221, Letdown Tem perature Isolation.
Standard: DEPRESS 2TV-0221, Regen HX Inlet ISO Valve CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished.
Comment: SAT      UNSAT      Perform Step: 7b CLOSE the following Letdown valves:  HV-9204, Letdown to Regen He at Exchanger Isolation.
Standard: DEPRESS 2HV-9204, Regen HX Inlet ISO Valve CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished.
Comment: SAT      UNSAT      Perform Step: 7c CLOSE the following Letdown valves: TV-9267, Letdown Heat Exchanger Outlet.
Standard:
DEPRESS 2TV-9267, Regen HX Outlet ISO Valve CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 5 of 6 SONGS Oct 2009 NRC JPM S-2 Rev 0.doc Perform Step: 7d CLOSE the following Letdown valves:  HV-9205, Letdown Cont ainment Isolation.
Standard:
DEPRESS 2HV-9205, Regen HX Outlet ISO Valve CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished.
Comment: SAT     UNSAT     Perform Step: 8a PLACE backup Charging Pump(s) to STOP.
Standard: DEPRESS 2P-190, Charging Pump STOP pushbutton and OBSERVE green STOP light illuminated and white AUTO light extinguished.
Comment: SAT     UNSAT     Perform Step: 8b PLACE backup Charging Pump(s) to STOP.
Standard: DEPRESS 2P-192, Charging Pump STOP pushbutton and OBSERVE green STOP light illuminated and white AUTO light extinguished.
Comment: SAT     UNSAT     Perform Step: 8c STOP operating Charging Pump(s).
Standard: DEPRESS 2P-191, Charging Pump STOP pushbutton and OBSERVE green STOP light illuminated and white AUTO light extinguished.
Comment: SAT     UNSAT     Perform Step: 9 LOWER PIC-0201A or B Setpoint for the in-service Letdown Backpressure Controller to < 165 psig.
Standard:
DEPRESS 2PIC-0201B, Backpressure Control SEL pushbutton until OSP is observed then DEPRESS LOWER pushbutton () until setpoint is less than 165 psig as read on 2PIC-0201B. Terminating Cue: This JPM is complete.
Comment: SAT     UNSAT       STOP TIME:
Appendix C JPM CUE SHEET Form ES-C-1 Page 6 of 6 SONGS Oct 2009 NRC JPM S-2 Rev 0.doc INITIAL CONDITIONS: The following conditions exist on Unit 2:  Power is stable at 100%. The Reactor Coolant System leakrate is elevated but is not evident in the Containment. Steam Generator samples are less than Minimum Detectable Activity. A walkdown outside the Contai nment has not identified a leak source. The leakage source is suspected to be the Charging


Pump. Management has given permission to secure Charging and Letdown to perform an RCS Inventory Balance.  
Appendix C                    JPM CUE SHEET                        Form ES-C-1 INITIAL CONDITIONS: The following conditions exist on Unit 2:
* Power is stable at 100%.
* The Reactor Coolant System leakrate is elevated but is not evident in the Containment.
* Steam Generator samples are less than Minimum Detectable Activity.
* A walkdown outside the Containment has not identified a leak source.
* The leakage source is suspected to be the Charging Pump.
* Management has given permission to secure Charging and Letdown to perform an RCS Inventory Balance.
INITIATING CUE:    The Control Room Supervisor directs you to SECURE Charging and Letdown per SO23-3-2.1.2, CVCS Outage Evolutions, Section 6.2, Securing Charging and Letdown.
Page 6 of 6        SONGS Oct 2009 NRC JPM S-2 Rev 0.doc


INITIATING CUE: The Control Room Supervisor directs you to SECURE Charging and Letdown per SO 23-3-2.1.2, CVCS Outage Evolutions, Section 6.2, Securing Charging and Letdown.  
Appendix C                                    JPM WORKSHEET                                  Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC S-3               Task #192218      K/A #006.A4.07      4.4 / 4.4    SF-3


Appendix C JPM WORKSHEET Form ES-C-1 Page 1 of 9 SONGS Oct 2009 NRC JPM S-3 Rev 0.doc        Facility: SONGS JPM # RO/SRO NRC S-3 Task #192218 K/A #006.A4.07  4.4 / 4.4  SF-3Title: Simultaneous Hot Leg and Cold Leg Injection Examinee (Print):
==Title:==
Simultaneous Hot Leg and Cold Leg Injection Examinee (Print):
Testing Method:
Testing Method:
Simulated Performance:   Classroom:   Actual Performance: X Simulator: X Plant:   READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue. When you complete the task successfully, the objective for this JPM will be satisfied.
Simulated Performance:                                       Classroom:
Initial Conditions: Given the fo llowing conditions on Unit 2: The plant has experienced a Loss of Coolant Accident. Over two hours have elapsed since Safety Injection Actuation Signal (SIAS) initiation. Shutdown Cooling Syst em operation is not expected to occur within four (4) hours of SIAS actuation.
Actual Performance:             X                           Simulator:     X Plant:
Initiating Cue: The Control Room Supervisor directs you to PERFORM SO23-12-11, EOI Supporting Attachments, Attachment 11, Simultaneous Hot/Cold Leg Injection.
READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.
Task Standard: Locate and correctly perform Critical Steps of SO23-12-11, EOI Supporting Attachments, Attachment 11.  
When you complete the task successfully, the objective for this JPM will be satisfied.
Initial Conditions:     Given the following conditions on Unit 2:
* The plant has experienced a Loss of Coolant Accident.
* Over two hours have elapsed since Safety Injection Actuation Signal (SIAS) initiation.
* Shutdown Cooling System operation is not expected to occur within four (4) hours of SIAS actuation.
Initiating Cue:         The Control Room Supervisor directs you to PERFORM SO23-12-11, EOI Supporting Attachments, Attachment 11, Simultaneous Hot/Cold Leg Injection.
Task Standard:           Locate and correctly perform Critical Steps of SO23-12-11, EOI Supporting Attachments, Attachment 11.
Required Materials: SO23-12-11, EOI Supporting Attachments, Rev 6.
Validation Time:        20 minutes    Time Critical: N/A    Completion Time:    ________ minutes Comments:
Result:  SAT            UNSAT Examiner (Print / Sign):                                                          Date:
Page 1 of 9                      SONGS Oct 2009 NRC JPM S-3 Rev 0.doc


Required Materials: SO23-12-11, EOI Supporting Attachments, Rev 6.  
Appendix C                        JPM WORKSHEET                          Form ES-C-1 SIMULATOR SETUP MACHINE OPERATOR:
INITIALIZE to IC#233 or any 100% power Initial Condition and PERFORM the following:
* INSERT RC03, RCS Leak at 100%.
* INSERT RC01A, RCS Rupture at 20% until RCS pressure is < 500 psia then LOWER to 0.015%.
* INSERT malfunctions EC08C and EC08DA, HPSI Pump P-017 and P-018 (Train A) trips.
* ENSURE only Train B HPSI is operating.
* EXECUTE remote function EC79A, CLOSE 2HV-9434 breaker when directed.
EXAMINER:
PROVIDE the examinee with a copy of:
* SO23-12-11, EOI Supporting Attachments, Attachment 11, Simultaneous Hot /
Cold Leg Injection.
Page 2 of 9              SONGS Oct 2009 NRC JPM S-3 Rev 0.doc


Validation Time: 20 minutes Time Critical: N/A Completion Time: ________ minutes Comments:   Result: SAT UNSAT   Examiner (Print / Sign): Date:
Appendix C                            JPM STEPS                              Form ES-C-1
Appendix C JPM WORKSHEET Form ES-C-1 Page 2 of 9 SONGS Oct 2009 NRC JPM S-3 Rev 0.doc SIMULATOR SETUP
- Check Mark Denotes Critical Step                  START TIME:
Perform Step: 1    VERIFY Entry Conditions:
* ENSURE time elapsed from SIAS actuation - greater than 2 hours.
Standard:          VERIFY greater than 2 hours from SIAS actuation per Initial Conditions.
Comment:                                                       SAT        UNSAT Perform Step: 2    VERIFY Entry Conditions:
* VERIFY FS-7, VERIFY SI Throttle/Stop Criteria - NOT satisfied Standard:         DETERMINE SI Throttle/Stop Criteria not met due to Pressurizer level.
Comment:                                                        SAT        UNSAT Perform Step: 3    ENSURE SDC Valves Closed:
* ENSURE SDC To LPSI Pump Suction Isolation valves - closed:
HV-9337 Standard:          OBSERVE 2HV-9337, SDC to LPSI Pumps Suction ISO Valve green CLOSE light illuminated.
Comment:                                                        SAT        UNSAT Perform Step: 4    ENSURE SDC Valves Closed:
* ENSURE SDC To LPSI Pump Suction Isolation valves - closed:
HV-9377 Standard:          OBSERVE 2HV-9377, SDC to LPSI Pumps Suction ISO Valve green CLOSE light illuminated.
Comment:                                                       SAT       UNSAT Perform Step: 5    ENSURE SDC Valves Closed:
* ENSURE SDC To LPSI Pump Suction Isolation valves - closed:
HV-9339 Standard:          OBSERVE 2HV-9339, SDC to LPSI Pumps Suction ISO Valve green CLOSE light illuminated.
Comment:                                                        SAT        UNSAT Page 3 of 9             SONGS Oct 2009 NRC JPM S-3 Rev 0.doc


MACHINE OPERATOR
Appendix C                        JPM STEPS                            Form ES-C-1 Perform Step: 6 ENSURE SDC Valves Closed:
: INITIALIZE to IC#233 or any 100% power Init ial Condition and PERFORM the following:   INSERT RC03, RCS Leak at 100%. INSERT RC01A, RCS Rupture at 20% unt il RCS pressure is < 500 psia then LOWER to 0.015%. INSERT malfunctions EC08C and EC08DA, HPSI Pump P-017 and P-018 (Train A) trips. ENSURE only Train B HPSI is operating. EXECUTE remote function EC79A, CLOSE 2HV-9434 breaker when directed.  
* ENSURE SDC To LPSI Pump Suction Isolation valves - closed:
HV-9378 Standard:       OBSERVE 2HV-9378, SDC to LPSI Pumps Suction ISO Valve green CLOSE light illuminated.
Comment:                                                      SAT    UNSAT Perform Step: 7 VERIFY HPSI Operability:
* VERIFY both trains of HPSI - operating Standard:      DETERMINE only Train B of HPSI is operating and OBSERVE green STOP lights illuminated for the Train A HPSI Pumps 2P017 and 2P018.
Comment:                                                      SAT    UNSAT Examiner Note:  The following steps represent the alternate path for this JPM.
Perform Step: 8 VERIFY PZR pressure - greater than 500 PSIA (Low Range):
* QSPDS page 611
* CFMS page 311 Standard:      REFERENCE QSPDS page 611 and CFMS page 311 and OBSERVE Low Range Pressurizer pressure on both pages read less than 500 psig and ENTERS RNO column.
Comment:                                                      SAT    UNSAT Perform Step: 9 ENSURE only one HPSI Pump - operating AND GO TO step 15.
Standard:      OBSERVE 2HS-9394-2, HPSI Pump 2P019 red START light illuminated and ammeter reading ~ 55 amps and TRANSITION to Step 15.
Comment:                                                      SAT    UNSAT Page 4 of 9          SONGS Oct 2009 NRC JPM S-3 Rev 0.doc


EXAMINER: PROVIDE the examinee with a copy of: SO23-12-11, EOI Supporting At tachments, Attachment 11, Simultaneous Hot /
Appendix C                            JPM STEPS                          Form ES-C-1 Perform Step: 10 RECORD the HPSI Cold Leg Flow Rates:
Cold Leg Injection.  
* FI-0321: _______ GPM
* FI-0331: _______ GPM
* FI-0311: _______ GPM
* FI-0341: _______ GPM SUM: _______ GPM (Total flow to cold legs)
Standard:        OBSERVE HPSI Cold Leg flow instruments and RECORD values:
* 2FI-0321-1, HPSI Flow to Cold Leg Loop 1B at ~210 gpm.
* 2FI-0331-1, HPSI Flow to Cold Leg Loop 2A at ~210 gpm.
* 2FI-0311-2, HPSI Flow to Cold Leg Loop 1A at ~210 gpm.
* 2FI-0341-2, HPSI Flow to Cold Leg Loop 2B at ~210 gpm.
* 230 gpm + 230 gpm + 180 gpm + 230 gpm = 840 gpm Comment:                                                      SAT      UNSAT Perform Step: 11 HPSI train in service - identified:
Train A      Train B Standard:        IDENTIFY Train B HPSI as in-service.
Comment:                                                      SAT      UNSAT Perform Step: 12  ENSURE key switches to associated RCS Hot Leg Isolation valves -
closed: Train B HV-9434 Standard:        DETERMINE 2HV-9434, HPSI HDR 2 to Loop 1 Hot Leg ISO Valve keyswitch in CLOSE and green CLOSE light illuminated.
Comment:                                                      SAT      UNSAT Perform Step: 13  ENSURE associated breaker - unlocked and closed: BZ-39 Standard:        DIRECT the PEO to unlock and CLOSE breaker 2BZ-39.
M.O. Cue:        EXECUTE remote function EC79A and REPORT breaker 2BZ-39 is closed.
Comment:                                                      SAT      UNSAT Page 5 of 9            SONGS Oct 2009 NRC JPM S-3 Rev 0.doc


Appendix C JPM STEPS Form ES-C-1 Page 3 of 9 SONGS Oct 2009 NRC JPM S-3 Rev 0.doc        - Check Mark Denotes Critical Step START TIME:
Appendix C                             JPM STEPS                             Form ES-C-1 Examiner Note:   Each of the following four sub-steps may be repeated as each header is throttled.
Perform Step: 1 VERIFY Entry Conditions:  ENSURE time elapsed from SIAS actuation -
Perform Step: 14 ADJUST the following valves on the associated train to reduce the indicated flow rates to approximately one half of those recorded in step 15: Train B HV-9323 Standard:         DEPRESS 2HV-9323, HDR 2 to Loop 1A OVERRIDE then JOG CLOSE pushbuttons until flow on 2FI-0321-1 is approximately 1/2 recorded value.
greater than 2 hours. Standard: VERIFY greater than 2 hour s from SIAS actuation per Initial Conditions.
Comment:                                                         SAT       UNSAT Perform Step: 15 ADJUST the following valves on the associated train to reduce the indicated flow rates to approximately one half of those recorded in step 15: Train B HV-9326 Standard:         DEPRESS 2HV-9326, HDR 2 to Loop 1B OVERRIDE then JOG CLOSE pushbuttons until flow on 2FI-0331-1 is approximately 1/2 recorded value.
Comment: SAT      UNSAT      Perform Step: 2 VERIFY Entry Conditions:  VERIFY FS-7, VERIFY SI Throttle/Stop Criteria -
Comment:                                                         SAT       UNSAT Perform Step: 16 ADJUST the following valves on the associated train to reduce the indicated flow rates to approximately one half of those recorded in step 15: Train B HV-9329 Standard:         DEPRESS 2HV-9329, HDR 2 to Loop 2A OVERRIDE then JOG CLOSE pushbuttons until flow on 2FI-0311-2 is approximately 1/2 recorded value.
NOT  satisfied Standard: DETERMINE SI Throttle/Stop Criteria not met due to Pressurizer level.
Comment:                                                         SAT       UNSAT Perform Step: 17 ADJUST the following valves on the associated train to reduce the indicated flow rates to approximately one half of those recorded in step 15: Train B HV-9332 Standard:         DEPRESS 2HV-9332, HDR 2 to Loop 2B OVERRIDE then JOG CLOSE pushbuttons until flow on 2FI-0341-2 is approximately 1/2 recorded value.
Comment: SAT      UNSAT      Perform Step: 3  ENSURE SDC Valves Closed:  ENSURE SDC To LPSI Pump Suction Isolation valves -
Comment:                                                         SAT       UNSAT Perform Step: 18 ENSURE associated Hot Leg Injection valve - open: Train B HV-9434 Standard:         PLACE 2HV-9434, HPSI HDR 2 to Loop 1 Hot Leg ISO Valve keyswitch in OPEN and OBSERVE red OPEN light illuminated and valve position indication at 100%.
closed: HV-9337  Standard: OBSERVE 2HV-9337, SDC to LPSI Pumps Suction ISO Valve green CLOSE light illuminated.
Comment:                                                         SAT       UNSAT Page 6 of 9           SONGS Oct 2009 NRC JPM S-3 Rev 0.doc
Comment: SAT      UNSAT      Perform Step: 4  ENSURE SDC Valves Closed:  ENSURE SDC To LPSI Pump Suction Isolation valves -
closed: HV-9377  Standard: OBSERVE 2HV-9377, SDC to LPSI Pumps Suction ISO Valve green CLOSE light illuminated.
Comment: SAT      UNSAT      Perform Step: 5  ENSURE SDC Valves Closed:  ENSURE SDC To LPSI Pump Suction Isolation valves -
closed: HV-9339  Standard: OBSERVE 2HV-9339, SDC to LPSI Pumps Suction ISO Valve green CLOSE light illuminated.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 4 of 9 SONGS Oct 2009 NRC JPM S-3 Rev 0.doc Perform Step: 6  ENSURE SDC Valves Closed:  ENSURE SDC To LPSI Pump Suction Isolation valves -
closed: HV-9378  Standard: OBSERVE 2HV-9378, SDC to LPSI Pumps Suction ISO Valve green CLOSE light illuminated.
Comment: SAT      UNSAT      Perform Step: 7 VERIFY HPSI Operability:  VERIFY both trains of HPSI - operating Standard: DETERMINE only Train B of HPSI is operating and OBSERVE green STOP lights illuminated for the Trai n A HPSI Pumps 2P017 and 2P018.
Comment: SAT      UNSAT      Examiner Note: The following steps represen t the alternate path for this JPM.
Perform Step: 8 VERIFY PZR pressure -
greater than 500 PSI A (Low Range):  QSPDS page 611  CFMS page 311 Standard:
REFERENCE QSPDS page 611 and CFMS page 311 and OBSERVE Low Range Pressurizer pressure on both pages read less than 500 psig and ENTERS RNO column.
Comment: SAT      UNSAT      Perform Step: 9 ENSURE only one HPSI Pump -
operating AND GO TO step 15.
Standard: OBSERVE 2HS-9394-2, HPSI Pump 2P019 red START light illuminated and ammeter reading ~ 55 amps and TRANSITION to Step 15.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 5 of 9 SONGS Oct 2009 NRC JPM S-3 Rev 0.doc Perform Step: 10 RECORD the HPSI Cold Leg Flow Rates:  FI-0321: _______ GPM  FI-0331: _______ GPM  FI-0311: _______ GPM  FI-0341: _______ GPM  SUM:    _______ GPM (Tot al flow to cold legs)
Standard:
OBSERVE HPSI Cold Leg flow instruments and RECORD values:  2FI-0321-1, HPSI Flow to Cold Leg Loop 1B at ~210 gpm. 2FI-0331-1, HPSI Flow to Cold Leg Loop 2A at ~210 gpm. 2FI-0311-2, HPSI Flow to Cold Leg Loop 1A at ~210 gpm. 2FI-0341-2, HPSI Flow to Cold Leg Loop 2B at ~210 gpm. 230 gpm + 230 gpm + 180 gpm + 230 gpm = 840 gpm Comment: SAT      UNSAT      Perform Step: 11 HPSI train in service -
identified:  Train A ~~ Train B ~
Standard:
IDENTIFY Train B HPSI as in-service.
Comment: SAT      UNSAT      Perform Step: 12  ENSURE key switches to associated RCS Hot Leg Isolation valves -
closed: Train B HV-9434 Standard: DETERMINE 2HV-9434, HPSI HDR 2 to Loop 1 Hot Leg ISO Valve keyswitch in CLOSE and green CLOSE light illuminated.
Comment: SAT      UNSAT      Perform Step: 13 ENSURE associated breaker -
unlocked and closed: BZ-39 Standard:
DIRECT the PEO to unlock and CLOSE breaker 2BZ-39. M.O. Cue: EXECUTE remote function EC79A and REPORT breaker 2BZ-39 is closed. Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 6 of 9 SONGS Oct 2009 NRC JPM S-3 Rev 0.doc        Examiner Note: Each of the following four sub-steps may be repeated as each header is throttled.
Perform Step: 14 ADJUST the following valves on the associated train to reduce the indicated flow rates to approximatel y one half of those recorded in step 15: Train B HV-9323 Standard: DEPRESS 2HV-9323, HDR 2 to Loop 1A OVERRIDE then JOG CLOSE pushbuttons until flow on 2FI-0321-1 is approximately 1/2 recorded value.
Comment: SAT     UNSAT     Perform Step: 15 ADJUST the following valves on the associated train to reduce the indicated flow rates to approximatel y one half of those recorded in step 15: Train B HV-9326 Standard: DEPRESS 2HV-9326, HDR 2 to Loop 1B OVERRIDE then JOG CLOSE pushbuttons until flow on 2FI-0331-1 is approximately 1/2 recorded value.
Comment: SAT     UNSAT     Perform Step: 16 ADJUST the following valves on the associated train to reduce the indicated flow rates to approximatel y one half of those recorded in step 15: Train B HV-9329 Standard: DEPRESS 2HV-9329, HDR 2 to Loop 2A OVERRIDE then JOG CLOSE pushbuttons until flow on 2FI-0311-2 is approximately 1/2 recorded value.
Comment: SAT     UNSAT     Perform Step: 17 ADJUST the following valves on the associated train to reduce the indicated flow rates to approximatel y one half of those recorded in step 15: Train B HV-9332 Standard: DEPRESS 2HV-9332, HDR 2 to Loop 2B OVERRIDE then JOG CLOSE pushbuttons until flow on 2FI-0341-2 is approximately 1/2 recorded value.
Comment: SAT     UNSAT     Perform Step: 18 ENSURE associated Hot Leg Injection valve -
open: Train B HV-9434 Standard: PLACE 2HV-9434, HPSI HDR 2 to Loop 1 Hot Leg ISO Valve keyswitch in OPEN and OBSERVE red OPEN light illuminated and valve position indication at 100%.
Comment: SAT     UNSAT Appendix C JPM STEPS Form ES-C-1 Page 7 of 9 SONGS Oct 2009 NRC JPM S-3 Rev 0.doc Perform Step: 19  ADJUST associated RCS Cold Leg Inje ction valves on the operating train to values obtained in step 16d: Train B HV-9323 Standard: DEPRESS 2HV-9323, HDR 2 to Loop 1A JOG OPEN pushbutton until flow on 2FI-0321-1 is approximately the value of JPM Step 14.
Comment: SAT      UNSAT      Perform Step: 20 ADJUST associated RCS Cold Leg Inje ction valves on the operating train to values obtained in step 16d: Train B HV-9326 Standard: DEPRESS 2HV-9326, HDR 2 to Loop 1B JOG OPEN pushbutton until


flow on 2FI-0331-1 is approximately the value of JPM Step 15.
Appendix C                            JPM STEPS                          Form ES-C-1 Perform Step: 19 ADJUST associated RCS Cold Leg Injection valves on the operating train to values obtained in step 16d: Train B HV-9323 Standard:        DEPRESS 2HV-9323, HDR 2 to Loop 1A JOG OPEN pushbutton until flow on 2FI-0321-1 is approximately the value of JPM Step 14.
Comment: SAT     UNSAT     Perform Step: 21 ADJUST associated RCS Cold Leg Inje ction valves on the operating train to values obtained in step 16d: Train B HV-9329 Standard: DEPRESS 2HV-9329, HDR 2 to Loop 2A JOG OPEN pushbutton until  
Comment:                                                          SAT    UNSAT Perform Step: 20 ADJUST associated RCS Cold Leg Injection valves on the operating train to values obtained in step 16d: Train B HV-9326 Standard:        DEPRESS 2HV-9326, HDR 2 to Loop 1B JOG OPEN pushbutton until flow on 2FI-0331-1 is approximately the value of JPM Step 15.
Comment:                                                         SAT     UNSAT Perform Step: 21 ADJUST associated RCS Cold Leg Injection valves on the operating train to values obtained in step 16d: Train B HV-9329 Standard:         DEPRESS 2HV-9329, HDR 2 to Loop 2A JOG OPEN pushbutton until flow on 2FI-0311-2 is approximately the value of JPM Step 16.
Comment:                                                          SAT    UNSAT Perform Step: 22 ADJUST associated RCS Cold Leg Injection valves on the operating train to values obtained in step 16d: Train B HV-9332 Standard:        DEPRESS 2HV-9332, HDR 2 to Loop 2B JOG OPEN pushbutton until flow on 2FI-0341-2 is approximately the value of JPM Step 17.
Comment:                                                          SAT    UNSAT Page 7 of 9            SONGS Oct 2009 NRC JPM S-3 Rev 0.doc


flow on 2FI-0311-2 is approximately the value of JPM Step 16.
Appendix C                          JPM STEPS                              Form ES-C-1 Perform Step: 23 ESTABLISH the following conditions:
Comment: SAT      UNSAT      Perform Step: 22 ADJUST associated RCS Cold Leg Inje ction valves on the operating train to values obtained in step 16d: Train B HV-9332 Standard: DEPRESS 2HV-9332, HDR 2 to Loop 2B JOG OPEN pushbutton until
* Indicated flow sum of: FI-0321, FI-0331, FI-0311, FI-0341 and FI-9435 - less than or equal to 910 GPM.
Standard:         OBSERVE HPSI Hot & Cold Leg flow instruments, RECORD values, and DETERMINE flow is less than 910 gpm:
* 2FI-0321-1, HPSI Flow to Cold Leg Loop 1B at ~105 gpm.
* 2FI-0331-1, HPSI Flow to Cold Leg Loop 2A at ~155 gpm.
* 2FI-0311-2, HPSI Flow to Cold Leg Loop 1A at ~105 gpm.
* 2FI-0341-2, HPSI Flow to Cold Leg Loop 2B at ~105 gpm.
* 2FI-9435, HPSI HDR 2 to Loop 1 Flow at ~440 gpm.
* 105 gpm + 105 gpm + 105 gpm + 105 gpm + 440 gpm = 860 gpm Terminating Cue:  This JPM is complete.
Comment:                                                        SAT      UNSAT STOP TIME:
Page 8 of 9            SONGS Oct 2009 NRC JPM S-3 Rev 0.doc


flow on 2FI-0341-2 is approximately the value of JPM Step 17.
Appendix C                     JPM CUE SHEET                         Form ES-C-1 INITIAL CONDITIONS: Given the following conditions on Unit 2:
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 8 of 9 SONGS Oct 2009 NRC JPM S-3 Rev 0.doc Perform Step: 23 ESTABLISH the following conditions:  Indicated flow sum of: FI-0321, FI-0331, FI-0311, FI-0341 and FI-9435 - less than or equal to 910 GPM.
* The plant has experienced a Loss of Coolant Accident.
Standard:
* Over two hours have elapsed since Safety Injection Actuation Signal (SIAS) initiation.
OBSERVE HPSI Hot & Cold Leg flow instruments, RECORD values, and DETERMINE flow is less than 910 gpm:  2FI-0321-1, HPSI Flow to Cold Leg Loop 1B at ~105 gpm. 2FI-0331-1, HPSI Flow to Cold Leg Loop 2A at ~155 gpm.
* Shutdown Cooling System operation is not expected to occur within four (4) hours of SIAS actuation.
2FI-0311-2, HPSI Flow to Cold Leg Loop 1A at ~105 gpm. 2FI-0341-2, HPSI Flow to Cold Leg Loop 2B at ~105 gpm. 2FI-9435, HPSI HDR 2 to Loop 1 Flow at ~440 gpm. 105 gpm + 105 gpm + 105 gpm
INITIATING CUE:    The Control Room Supervisor directs you to PERFORM SO23-12-11, EOI Supporting Attachments, Attachment 11, Simultaneous Hot/ Cold Leg Injection.
+ 105 gpm + 440 gpm = 860 gpmTerminating Cue: This JPM is complete.
Page 9 of 9        SONGS Oct 2009 NRC JPM S-3 Rev 0.doc
Comment: SAT      UNSAT      STOP TIME:
Appendix C JPM CUE SHEET Form ES-C-1 Page 9 of 9 SONGS Oct 2009 NRC JPM S-3 Rev 0.doc INITIAL CONDITIONS: Given the following c onditions on Unit 2: The plant has experienced a Loss of Coolant Accident. Over two hours have elapsed since Safety Injection Actuation Signal (SIAS) initiation. Shutdown Cooling System operation is not expected to occur within four (4) hours of SIAS actuation.  


INITIATING CUE: The Control Room Supervisor directs you to PERFORM SO23-12-11, EOI Supporting Att achments, Attachment 11, Simultaneous Hot/ Cold Leg Injection.  
Appendix C                                    JPM WORKSHEET                                  Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC S-4                Task #192368      K/A #003.A4.06      2.9 / 2.9  SF-4P


Appendix C JPM WORKSHEET Form ES-C-1 Page 1 of 9 SONGS Oct 2009 NRC JPM S-4 Rev 0.doc        Facility: SONGS JPM # RO/SRO NRC S-4 Task #192368 K/A #003.A4.06  2.9 / 2.9  SF-4PTitle: Start a Reactor Coolant Pump Examinee (Print):
==Title:==
Start a Reactor Coolant Pump Examinee (Print):
Testing Method:
Testing Method:
Simulated Performance:   Classroom:   Actual Performance: X Simulator: X Plant:   READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue. When you complete the task successfully, the objective for this JPM will be satisfied.
Simulated Performance:                                       Classroom:
Initial Conditions: Given the following conditions: Unit 2 is in MODE 3. A heat up is in progress to the point of starting the 4 th Reactor Coolant Pump P-002. All actions of SO23-3-1.7, R eactor Coolant Pump Operation, through Step 6.1.18 are complete. An Operator is stationed at the Reactor Coolant Pump (RCP) in Containment.
Actual Performance:             X                           Simulator:     X Plant:
Initiating Cue: The Control Room Superviso r directs you to START Reactor Coolant Pump P-002 using SO23-3-1.7, Reactor Coolant Pump Oper ation, starting at Step 6.1.19.
READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.
Task Standard: Locate and correctly perform Critical Steps of SO23-3-1.7.  
When you complete the task successfully, the objective for this JPM will be satisfied.
Initial Conditions:     Given the following conditions:
* Unit 2 is in MODE 3.
* A heat up is in progress to the point of starting the 4th Reactor Coolant Pump P-002.
* All actions of SO23-3-1.7, Reactor Coolant Pump Operation, through Step 6.1.18 are complete.
* An Operator is stationed at the Reactor Coolant Pump (RCP) in Containment.
Initiating Cue:         The Control Room Supervisor directs you to START Reactor Coolant Pump P-002 using SO23-3-1.7, Reactor Coolant Pump Operation, starting at Step 6.1.19.
Task Standard:           Locate and correctly perform Critical Steps of SO23-3-1.7.
Required Materials: SO23-3-1.7, Reactor Coolant Pump Operation, Rev. 35.
SO23-15-56.C, 56C40 - RCP P002 CCW FLOW LO, Rev. 17.
Validation Time:        15 minutes      Time Critical: N/A    Completion Time:    ________ minutes Comments:
Result:  SAT            UNSAT Examiner (Print / Sign):                                                          Date:
Page 1 of 9                      SONGS Oct 2009 NRC JPM S-4 Rev 0.doc


Required Materials: SO23-3-1.7, Reactor Coolant Pump Operation, Rev. 35. SO23-15-56.C, 56C40 - RCP P002 CCW FLOW LO, Rev. 17.
Appendix C                        JPM WORKSHEET                          Form ES-C-1 SIMULATOR SETUP MACHINE OPERATOR:
INITIALIZE to IC#234 or any MODE 4 Initial Condition with RCS temperature > 400&#xba;F and PERFORM the following:
* DISPLAY PCS Trend Group Data page for RCP P002 as follows:
* ACCESS MAIN MENU on PCS.
* SELECT MAIN POINTS.
* SELECT POINT 1.
* Point Type Selected to SERVER GROUP.
* SELECT RCP 2 PARMS then SELECT ADD.
* INSERT Key #38, CPC A Trip Bypass and TURN to ON.
* INSERT Key #42, CPC B Trip Bypass and TURN to ON.
* INSERT Key #46, CPC C Trip Bypass and TURN to ON.
* INSERT Key #50, CPC D Trip Bypass and TURN to ON.
* INSERT malfunction CC02B for Annunciator 56C40 30 seconds minute after starting RCP P002.
EXAMINER:
PROVIDE the examinee with a copy of:
* SO23-3-1.7, Reactor Coolant Pump Operation.
* INITIAL through Step 6.1.18.
Page 2 of 9              SONGS Oct 2009 NRC JPM S-4 Rev 0.doc


Validation Time: 15 minutes Time Critical: N/A Completion Time: ________ minutes  
Appendix C                              JPM STEPS                            Form ES-C-1
- Check Mark Denotes Critical Step                    START TIME:
Examiner Note:    Ensure the setup page information for Plant Computer System Trend Group Data is complete.
Perform Step: 1  START one Oil Lift Pump by selecting the NORMAL mode.
Standard:          DEPRESS the NORMAL pushbutton on either 2HS-9117A, 2P002 Oil Lift Pump 2P262, or 2HS-9118A, 2P002 Oil Lift Pump 2P263 and OBSERVE amber NORMAL and red START lights illuminated.
Examiner Note:    Annunciator alarm 56C39 will come in and reset. This is an expected alarm.
Comment:                                                          SAT      UNSAT Perform Step: 2    ENSURE the second oil lift pump selected to STANDBY.
Standard:          DEPRESS the STANDBY pushbutton on either 2HS-9117A, 2P002 Oil Lift Pump 2P262 or 2HS-9118A, 2P002 Oil Lift Pump 2P263, whichever was not started in the previous step and VERIFY amber STANDBY and green STOP lights illuminated.
Examiner Cue:      Two minutes has elapsed.
Comment:                                                           SAT      UNSAT Perform Step: 3  After the Oil Lift System has run approximately 2 minutes, then START the ARRD Lube Oil Pump by selecting the NORMAL mode.
Standard:          DEPRESS the NORMAL pushbutton on either 2HS-9196, 2P002 ARRD Pump 2P401 or 2HS-9197, 2P002 ARRD Pump 2P402 and OBSERVE amber NORMAL and red START lights illuminated.
Comment:                                                          SAT      UNSAT Perform Step: 4    ENSURE the second ARRD pump is available by selecting STANDBY mode.
Standard:          DEPRESS the STANDBY pushbutton on either 2HS-9196, 2P002 ARRD Pump 2P401 or 2HS-9197, 2P002 ARRD Pump 2P402, whichever was not started in the previous step and VERIFY amber STANDBY and green STOP lights illuminated.
Comment:                                                          SAT      UNSAT Page 3 of 9              SONGS Oct 2009 NRC JPM S-4 Rev 0.doc


CommentsResult: SAT UNSAT   Examiner (Print / Sign): Date:
Appendix C                        JPM STEPS                            Form ES-C-1 Perform Step: 5 VERIFY the following alarms on Panel CR56 are reset prior to the start of the associated RCP:
Appendix C JPM WORKSHEET Form ES-C-1 Page 2 of 9 SONGS Oct 2009 NRC JPM S-4 Rev 0.doc SIMULATOR SETUP
* RCP THRUST BEARINGS TEMP HI (56C03, 05, 07, and 09)
* RCP LUBE OIL FLOW LO (56C13, 15, 17, and 19)
* RCP REVERSE ROTATION (56C14, 16, 18, and 20)
* RCP OIL LIFT FLOW LO (56C23, 25, 27, and 29)
* RCP OIL LIFT PRESS LO (56C33, 35, 37, and 39)
* RCP CCW FLOW LO (56C34, 36, 38, and 40)
* RCP ARRD LUBE OIL FLOW LO (56C43, 45, 47, and 49)
Standard:      OBSERVE alarms on Panel CR-56 are RESET prior to starting RCP:
* 56C09 - RCP P002 THRUST BRG TEMP HI
* 56C19 - RCP P002 LUBE OIL FLOW LO
* 56C20 - RCP P002 REVERSE ROTATION
* 56C29 - RCP P002 OIL LIFT FLOW LO
* 56C39 - RCP P002 OIL LIFT PRESS LO
* 56C40 - RCP P002 CCW FLOW LO
* 56C49 - RCP P002 ARRD LUBE OIL FLOW LO Comment:                                                        SAT    UNSAT Perform Step: 6 Verify PCS Points selected in Step 6.1.8 not in alarm.
Standard:      OBSERVE RCP 2P-002 information on Plant Computer System.
Examiner CueThere are no Plant Computer System points in alarm for the RCPs.
Comment:                                                       SAT   UNSAT Perform Step: 7 Verify RCP CONTROLLED BLEED-OFF FLOW (PCS) is reset or proper RCP CBO flow for the existing RCS pressure.
Standard:       VERIFY RCP Controlled Bleed-Off Flow on Plant Computer System is RESET (Point ID F-180) or proper RCP CBO flow for the existing RCS pressure (~1.5 gpm).
Comment:                                                        SAT    UNSAT Page 4 of 9           SONGS Oct 2009 NRC JPM S-4 Rev 0.doc


MACHINE OPERATOR
Appendix C                          JPM STEPS                          Form ES-C-1 Perform Step: 8  Verify CCW SEAL HEAT EXCHANGER TEMPERATURE HI (PCS) alarm is reset.
: INITIALIZE to IC#234 or any MODE 4 Initial Condition with RCS temperature > 400&#xba;F and PERFORM the following:
Standard:       VERIFY CCW Seal Exchanger temperature high alarm on Plant Computer System is RESET (Point ID TE-9174).
DISPLAY PCS Trend Group Data page for RCP P002 as follows: ACCESS MAIN MENU on PCS. SELECT MAIN POINTS. SELECT POINT 1. Point Type Selected to SERVER GROUP. SELECT RCP 2 PARMS then SELECT ADD. INSERT Key #38, CPC A Trip Bypass and TURN to ON. INSERT Key #42, CPC B Trip Bypass and TURN to ON. INSERT Key #46, CPC C Trip Bypass and TURN to ON. INSERT Key #50, CPC D Trip Bypass and TURN to ON. INSERT malfunction CC02B for Annunciator 56C40 30 seconds minute after starting RCP P002.  
Comment:                                                        SAT    UNSAT Perform Step: 9  VERIFY the following final configuration:
* One Oil Lift Pump selected to NORMAL
* One Oil Lift Pump selected to Standby
* One ARRD Pump selected to Normal
* One ARRD Pump selected to Standby
* Vibration Alarm reset Standard:        PERFORM final configuration check:
* VERIFY Oil Lift Pump, 2P262 or 2P263 amber NORMAL light illuminated.
* VERIFY Oil Lift Pump, 2P262 or 2P263 amber STANDBY light illuminated.
* VERIFY ARRD Pump, 2P401 or 2P402 amber NORMAL light illuminated.
* VERIFY ARRD Pump, 2P401 or 2P402 amber STANDBY light illuminated.
* VERIFY Vibration Alarm reset on 2HS-0181, 2P002 Vibration Monitor white RESET light extinguished.
Comment:                                                        SAT    UNSAT Perform Step: 10 If Backfeeding Unit Aux Transformer (UAT) when in Modes 4 or 5, and a UAT high temperature alarm is received, then ENSURE only one RCP is running on the associated bus.
Standard:        DETERMINE Backfeeding via the Unit Auxiliary Transformer is not being performed.
Examiner Cue:    Backfeeding via the Unit Auxiliary Transformer is not being performed.
Comment:                                                        SAT    UNSAT Page 5 of 9            SONGS Oct 2009 NRC JPM S-4 Rev 0.doc


EXAMINER: PROVIDE the examinee with a copy of: SO23-3-1.7, Reactor Cool ant Pump Operation. INITIAL through Step 6.1.18.
Appendix C                            JPM STEPS                            Form ES-C-1 Perform Step: 11 VERIFY RCP Zero Speed lamp illuminated.
Standard:        OBSERVE 2SL-9116, Zero Speed Indication for RCP 2P002 white ZERO SPEED light illuminated.
Comment:                                                          SAT      UNSAT Perform Step: 12 If another RCP is already running, then ENSURE it has been in service for at least 5 minutes.
Standard:        DETERMINE that all three running RCPs have been in service for greater than 5 minutes.
Examiner Cue:    All running RCPs have run for more than 5 minutes.
Comment:                                                          SAT      UNSAT Perform Step: 13 If this RCP start is associated with an idle loop, then COMMENCE monitoring Nuclear Instrumentation and continue for approximately the first minute of pump operation.
Standard:       DETERMINE that RCP 2P004 is running and the loop is not idle.
Comment:                                                          SAT      UNSAT Perform Step: 14 ANNOUNCE pump start using local area page.
Standard:        DIAL 429 on phone and ANNOUNCE Reactor Coolant Pump 2P002 start.
Comment:                                                          SAT      UNSAT Page 6 of 9            SONGS Oct 2009 NRC JPM S-4 Rev 0.doc


Appendix C JPM STEPS Form ES-C-1 Page 3 of 9 SONGS Oct 2009 NRC JPM S-4 Rev 0.doc        - Check Mark Denotes Critical Step START TIME:
Appendix C                             JPM STEPS                           Form ES-C-1 Examiner Note:   Annunciator 50A51 - VIBRATION AND LOOSE PARTS MONITOR SYSTEM TROUBLE will come in and reset. This is an expected alarm when starting the RCP.
Examiner Note: Ensure the setup page information for Plant Computer System Trend Group Data is complete.
Perform Step: 15 START the Reactor Coolant Pump and PERFORM the following:
Perform Step: 1 START one Oil Lift Pump by selecting the NORMAL mode.
* Verify motor amps stabilize between 470 and 800 amps.
Standard: DEPRESS the NORMAL pushbutton on either 2HS-9117A, 2P002 Oil Lift Pump 2P262, or 2HS-9118A, 2P002 Oil Lift Pump 2P263 and OBSERVE amber NORMAL and red START lights illuminated. Examiner Note: Annunciator alarm 56C39 wi ll come in and reset. This is an expected alarm.
Standard:         DEPRESS 2HS-9163A, 2P002 START pushbutton and OBSERVE:
Comment: SAT     UNSAT     Perform Step: 2 ENSURE the second oil lift pump selected to STANDBY.
* Red START light illuminated and green STOP light extinguished.
Standard:
* VERIFY motor amps stabilize between 470 and 800 amps on ammeter.
DEPRESS the STANDBY pushbutton on either 2HS-9117A, 2P002 Oil Lift Pump 2P262 or 2HS-9118A, 2P002 Oil Lift Pump 2P263, whichever was not started in the previous step and VERIFY amber STANDBY and green STOP lights illuminated. Examiner Cue: Two minutes has elapsed.
Examiner Cue:     If examinee attempts to research cause of alarm, state that another operator is at 2L-194 verifying alarm was due to starting the RCP.
Comment: SAT     UNSAT     Perform Step: 3 After the Oil Lift System has r un approximately 2 minutes, then START the ARRD Lube Oil Pump by se lecting the NORMAL mode.
Comment:                                                           SAT     UNSAT Perform Step: 16 START the Reactor Coolant Pump and PERFORM the following:
Standard: DEPRESS the NORMAL pushbutton on either 2HS-9196, 2P002 ARRD Pump 2P401 or 2HS-9197, 2P002 ARRD Pump 2P402 and OBSERVE amber NORMAL and red START lights illuminated.
* Closely MONITOR RCS pressure.
Comment: SAT     UNSAT     Perform Step: 4 ENSURE the second ARRD pump is available by selecting STANDBY
Standard:         OBSERVE RCS pressure is satisfactory using any combination of Control Board, CFMS, QSPDS or PCS indicators.
Comment:                                                           SAT     UNSAT Perform Step: 17  Verify the Oil Lift and ARRD Pumps automatically stop and Zero Speed lamp extinguishes.
Standard:         OBSERVE:
* Oil Lift Pump indicators for 2P002 Oil Lift Pump 2P262 and 2P263, green STOP lights illuminated.
* ARRD Pump Indicators for 2P002 ARRD Pump 2P401 and 2P402, green STOP lights illuminated.
* 2SL-9116, 2P002 white ZERO SPEED light extinguished.
Comment:                                                           SAT     UNSAT Perform Step: 18 Check RCP Oil Reservoir levels SAT.
Standard:        DIRECT an Operator to REPORT RCP 2P002 Oil Reservoir levels.
Examiner Cue:    Operator at the pump reports oil levels are satisfactory.
Comment:                                                          SAT    UNSAT Page 7 of 9            SONGS Oct 2009 NRC JPM S-4 Rev 0.doc


mode. Standard: DEPRESS the STANDBY pushbutton on either 2HS-9196, 2P002
Appendix C                           JPM STEPS                             Form ES-C-1 Examiner Note:   The following steps represent the alternate path for this JPM.
 
ARRD Pump 2P401 or 2HS-9197, 2P002 ARRD Pump 2P402, whichever was not started in t he previous step and VERIFY amber STANDBY and green STOP lights illuminated.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 4 of 9 SONGS Oct 2009 NRC JPM S-4 Rev 0.doc Perform Step: 5 VERIFY the following alarms on Panel CR56 are reset prior to the start of the associated RCP:  RCP THRUST BEARINGS TEMP HI (56C03, 05, 07, and 09)  RCP LUBE OIL FLOW LO (56C13, 15, 17, and 19)  RCP REVERSE ROTATION (56C14, 16, 18, and 20)  RCP OIL LIFT FLOW  LO (56C23, 25, 27, and 29)  RCP OIL LIFT PRESS LO (56C33, 35, 37, and 39)  RCP CCW FLOW LO (56C34, 36, 38, and 40)  RCP ARRD LUBE OIL  FLOW LO (56C43, 45, 47, and 49)
Standard: OBSERVE alarms on Panel CR-56 are RESET prior to starting RCP:  56C09 - RCP P002 THRUST BRG TEMP HI  56C19 - RCP P002 LUBE OIL FLOW LO  56C20 - RCP P002 REVERSE ROTATION  56C29 - RCP P002 OIL LIFT FLOW LO  56C39 - RCP P002 OIL LIFT PRESS  LO  56C40 - RCP P002 CCW FLOW LO  56C49 - RCP P002 ARRD LUBE OIL FLOW LO Comment: SAT      UNSAT      Perform Step: 6 Verify PCS Points selected in Step 6.1.8 not in alarm.
Standard: OBSERVE RCP 2P-002 information on Plant Computer System. Examiner Cue: There are no Plant Computer System points in alarm for the RCPs.
Comment: SAT      UNSAT      Perform Step: 7  Verify RCP CONTROLLED BLEED-OFF FLOW (PCS) is reset or proper RCP CBO flow for the existing RCS pressure.
Standard:
VERIFY RCP Controlled Bleed-Off Flow on Plant Computer System is RESET (Point ID F-180) or proper RCP CBO flow for the existing RCS pressure (~1.5 gpm).
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 5 of 9 SONGS Oct 2009 NRC JPM S-4 Rev 0.doc Perform Step: 8 Verify CCW SEAL HEAT EXCHANGER TEMPERATURE HI (PCS) alarm is reset.
Standard:
VERIFY CCW Seal Exchanger tem perature high alarm on Plant Computer System is RE SET (Point ID TE-9174).
Comment: SAT      UNSAT      Perform Step: 9 VERIFY the following fi nal configuration:  One Oil Lift Pump selected to NORMAL  One Oil Lift Pump selected to Standby  One ARRD Pump selected to Normal  One ARRD Pump selected to Standby  Vibration Alarm reset Standard: PERFORM final configuration check:  VERIFY Oil Lift Pump, 2P262 or 2P263 amber NORMAL light illuminated. VERIFY Oil Lift Pump, 2P262 or 2P263 amber STANDBY light illuminated. VERIFY ARRD Pump, 2P401 or 2P402 amber NORMAL light illuminated. VERIFY ARRD Pump, 2P401 or 2P402 amber STANDBY light illuminated. VERIFY Vibration Alarm reset on 2HS-0181, 2P002 Vibration Monitor white RESET light extinguished.
Comment: SAT      UNSAT      Perform Step: 10 If Backfeeding Unit Aux Transformer (U AT) when in Modes 4 or 5, and a UAT high temperature alarm is received, then ENSURE only one RCP is running on the associated bus.
Standard:
DETERMINE Backfeeding via the Unit Auxiliary Transformer is not being performed. Examiner Cue: Backfeeding via the Unit Auxiliary Transformer is not being performed.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 6 of 9 SONGS Oct 2009 NRC JPM S-4 Rev 0.doc Perform Step: 11  VERIFY RCP Zero Speed lamp illuminated.
Standard: OBSERVE 2SL-9116, Zero Speed Indication for RCP 2P002 white ZERO SPEED light illuminated.
Comment: SAT      UNSAT      Perform Step: 12 If another RCP is already running, then ENSURE it has been in service for at least 5 minutes.
Standard:
DETERMINE that all three running RCPs have been in service for greater than 5 minutes. Examiner Cue: All running RCPs ha ve run for more than 5 minutes.
Comment: SAT      UNSAT      Perform Step: 13 If this RCP start is associated with an idle loop, then COMMENCE monitoring Nuclear Instrumentation and continue for approximately the
 
first minute of pump operation.
Standard:
DETERMINE that RCP 2P004 is runni ng and the loop is not idle.
Comment: SAT      UNSAT      Perform Step: 14 ANNOUNCE pump start using local area page.
Standard:
DIAL 429 on phone and ANNOUNCE Reactor Coolant Pump 2P002 start. Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 7 of 9 SONGS Oct 2009 NRC JPM S-4 Rev 0.doc        Examiner Note: Annunciator 50A51 - VIBRATION AND LOOSE PARTS MONITOR SYSTEM TROUBLE will come in and reset. This is an expected alarm when starting the RCP.
Perform Step: 15 START the Reactor Coolant Pump and PERFORM the following:  Verify motor amps stabilize between 470 and 800 amps.
Standard: DEPRESS 2HS-9163A, 2P002 START pushbutton and OBSERVE:  Red START light illuminated an d green STOP light extinguished. VERIFY motor amps stabilize between 470 and 800 amps on ammeter. Examiner Cue: If examinee attempts to r esearch cause of alarm, state that another operator is at 2L-194 verifying alarm was due to starting the RCP.
Comment: SAT      UNSAT      Perform Step: 16  START the Reactor Coolant Pump and PERFORM the following:  Closely MONITOR RCS pressure.
Standard: OBSERVE RCS pressure is satisfactory using any combination of Control Board, CFMS, QSPDS or PCS indicators.
Comment: SAT      UNSAT      Perform Step: 17 Verify the Oil Lift and ARRD Pumps aut omatically stop and Zero Speed lamp extinguishes.
Standard: OBSERVE:  Oil Lift Pump indicators for 2P002 Oil Lift Pump 2P262 and 2P263, green STOP lights illuminated. ARRD Pump Indicators for 2P002 ARRD Pump 2P401 and 2P402, green STOP lights illuminated. 2SL-9116, 2P002 white ZERO SPEED light extinguished.
Comment: SAT      UNSAT      Perform Step: 18 Check RCP Oil Reservoir levels SAT.
Standard: DIRECT an Operator to REPORT RCP 2P002 Oil Reservoir levels. Examiner Cue: Operator at the pump reports oil levels are satisfactory.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 8 of 9 SONGS Oct 2009 NRC JPM S-4 Rev 0.doc        Examiner Note: The following steps represen t the alternate path for this JPM.
Perform Step: 19  Acknowledge annunciator 56C40 - RCP P002 CCW FLOW LO.
Perform Step: 19  Acknowledge annunciator 56C40 - RCP P002 CCW FLOW LO.
Standard: ACKNOWLEDGE annunciator 56C40 - RCP P002 CCW FLOW LO and REFER to 56C40 Annunciator Response Procedure. Examiner Cue: If the examinee checks Plan t Computer System trends for 2P002 CCW FLOW LO, REPORT that CCW flow is 400 gpm and lowering  
Standard:         ACKNOWLEDGE annunciator 56C40 - RCP P002 CCW FLOW LO and REFER to 56C40 Annunciator Response Procedure.
Examiner Cue:     If the examinee checks Plant Computer System trends for 2P002 CCW FLOW LO, REPORT that CCW flow is 400 gpm and lowering and temperature is as read.
Comment:                                                        SAT      UNSAT Examiner Note:    The following guidance is provided in Annunciator Response Procedure for 56C40, Step 1.2.
Perform Step: 20  If in Modes 3-5, then stop 2(3)MP-002, RCP.
Standard:        RECOGNIZE operation in MODE 3 and DETERMINE RCP 2P002 must be stopped.
Comment:                                                        SAT      UNSAT Perform Step: 21 Trip RCP P002.
Standard:        DEPRESS 2HS-9163A, 2P002 STOP pushbutton and VERIFY green STOP light illuminated, red START light extinguished, and ammeter at zero (0) amps.
Terminating Cue:  This JPM is complete.
Comment:                                                        SAT      UNSAT STOP TIME:
Page 8 of 9              SONGS Oct 2009 NRC JPM S-4 Rev 0.doc


and temperature is as read.
Appendix C                     JPM CUE SHEET                           Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:
Comment: SAT      UNSAT      Examiner Note: The following guidance is provided in Annunciator Response Procedure for 56C40, Step 1.2.
* Unit 2 is in MODE 3.
Perform Step: 20 If in Modes 3-5, then stop 2(3)MP-002, RCP.
* A heat up is in progress to the point of starting the 4th Reactor Coolant Pump P-002.
Standard:
* All actions of SO23-3-1.7, Reactor Coolant Pump Operation, through Step 6.1.18 are complete.
RECOGNIZE operation in MODE 3 and DETERMINE RCP 2P002 must be stopped.
* An Operator is stationed at the Reactor Coolant Pump (RCP) in Containment.
Comment: SAT      UNSAT      Perform Step: 21  Trip RCP P002.
INITIATING CUE:    The Control Room Supervisor directs you to START Reactor Coolant Pump P-002 using SO23-3-1.7, Reactor Coolant Pump Operation, starting at Step 6.1.19.
Standard:
Page 9 of 9        SONGS Oct 2009 NRC JPM S-4 Rev 0.doc
DEPRESS 2HS-9163A, 2P002 STOP pushbutton and VERIFY green STOP light illuminated, red START light extinguished, and ammeter at zero (0) amps. Terminating Cue: This JPM is complete.
Comment: SAT      UNSAT      STOP TIME:
Appendix C JPM CUE SHEET Form ES-C-1 Page 9 of 9 SONGS Oct 2009 NRC JPM S-4 Rev 0.doc INITIAL CONDITIONS: Given the following conditions: Unit 2 is in MODE 3. A heat up is in progress to the point of starting the 4 th Reactor Coolant Pump P-002. All actions of SO23-3-1.7, Reactor Coolant Pump Operation, through Step 6.1.18 are complete. An Operator is stationed at the Reactor Coolant Pump (RCP) in Containment.  


INITIATING CUE: The Control Room Supervisor directs you to START Reactor Coolant Pump P-002 using SO23-3-1.7, Reactor Coolant Pump Operation, starting at Step 6.1.19.  
Appendix C                                    JPM WORKSHEET                                  Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC S-5                Task #192294      K/A #026.A2.08      3.2 / 3.7    SF-5


Appendix C JPM WORKSHEET Form ES-C-1 Page 1 of 8 SONGS Oct 2009 NRC JPM S-5 Rev 0.doc Facility: SONGS JPM # RO/SRO NRC S-5 Task #192294 K/A #026.A2.08  3.2 / 3.7  SF-5Title: Terminate the Containment Spray System Examinee (Print):
==Title:==
Terminate the Containment Spray System Examinee (Print):
Testing Method:
Testing Method:
Simulated Performance:   Classroom:   Actual Performance: X Simulator: X Plant:   READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue. When you complete the task successfully, the objective for this JPM will be satisfied.
Simulated Performance:                                       Classroom:
Initial Conditions: Given the following conditions: A Loss of Coolant Accident inside Containment has occurred. SO23-12-11, EOI Supporting Attachments, Attachment 2, Floating Steps, is being performed 105 minutes after the accident.
Actual Performance:             X                           Simulator:     X Plant:
Initiating Cue: The Control Room Supervisor directs you to PERFORM SO23-12-11, EOI Supporting Attachments, Floating Step 14, Terminate Containment Spray Operation.
READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.
Task Standard: Locate and correctly perform Critical Steps of SO23-12-11.  
When you complete the task successfully, the objective for this JPM will be satisfied.
Initial Conditions:     Given the following conditions:
* A Loss of Coolant Accident inside Containment has occurred.
* SO23-12-11, EOI Supporting Attachments, Attachment 2, Floating Steps, is being performed 105 minutes after the accident.
Initiating Cue:         The Control Room Supervisor directs you to PERFORM SO23-12-11, EOI Supporting Attachments, Floating Step 14, Terminate Containment Spray Operation.
Task Standard:           Locate and correctly perform Critical Steps of SO23-12-11.
Required Materials: SO23-12-11, EOI Supporting Attachments, Rev. 6.
Validation Time:        7 minutes      Time Critical: N/A    Completion Time:    ________ minutes Comments:
Result:  SAT            UNSAT Examiner (Print / Sign):                                                          Date:
Page 1 of 8                      SONGS Oct 2009 NRC JPM S-5 Rev 0.doc


Required Materials: SO23-12-11, EOI Supporting Attachments, Rev. 6.
Appendix C                         JPM WORKSHEET                         Form ES-C-1 SIMULATOR SETUP MACHINE OPERATOR:
 
INITIALIZE to IC#235 or any 100% power Initial Condition and PERFORM the following:
Validation Time: 7 minutes Time Critical: N/A Completion Time: ________ minutes Comments:  Result:  SAT  UNSAT  Examiner (Print / Sign):  Date:
* INSERT overrides for Containment ECUs E-400, E-401, and E-402 for the red START indicating lights off and the green STOP indicating lights on.
Appendix C JPM WORKSHEET Form ES-C-1 Page 2 of 8 SONGS Oct 2009 NRC JPM S-5 Rev 0.doc SIMULATOR SETUP
* INSERT malfunction RC03 @ 100%.
 
* INSERT malfunction MS03A and MS03B @ 1 to 5% to get Containment pressure to increase above 15 psig and then DELETE malfunctions.
MACHINE OPERATOR
: INITIALIZE to IC#235 or any 100% power In itial Condition and PERFORM the following:
INSERT overrides for Containment ECUs E-400, E-401, and E-402 for the red START indicating lights off and the green STOP indicating lights on. INSERT malfunction RC03 @ 100%. INSERT malfunction MS03A and MS03B @ 1 to 5% to get Containment pressure to increase above 15 psig and then DELETE malfunctions.
NOTE: Do not place the Simulator in RUN until examinee is ready to begin to preserve RWST level.
NOTE: Do not place the Simulator in RUN until examinee is ready to begin to preserve RWST level.
PERFORM the following after each JPM: ENSURE 2HV-6293B/A, Train A CCW to Letdown Heat Exchanger valve is OPEN.
PERFORM the following after each JPM:
* ENSURE 2HV-6293B/A, Train A CCW to Letdown Heat Exchanger valve is OPEN.
EXAMINER:
PROVIDE the examinee with a copy of:
* SO23-12-11, EOI Supporting Attachments, Attachment 2, Floating Step 14, Terminate Containment Spray Operation.
When Floating Step 14 is complete, PROVIDE the examinee with a copy of:
* SO23-12-11, EOI Supporting Attachments, Attachment 2, Floating Step 24, Transfer Charging Pump Suction.
Page 2 of 8              SONGS Oct 2009 NRC JPM S-5 Rev 0.doc


EXAMINER: PROVIDE the examinee with a copy of: SO23-12-11, EOI Supporting At tachments, Attachment 2, Floating Step 14, Terminate Containment Spray Operation.
Appendix C                            JPM STEPS                            Form ES-C-1
When Floating Step 14 is complete, PROVIDE the examinee with a copy of: SO23-12-11, EOI Supporting At tachments, Attachment 2, Floating Step 24, Transfer Charging Pump Suction.  
- Check Mark Denotes Critical Step                    START TIME:
Perform Step: 1    Verify Containment pressure - less than 14 psig, and - stable or lowering.
Standard:         OBSERVE 2PI-0351-1, 2, 3, & 4, Containment Pressure Narrow Range Indicators on CR-57 or 2PI-0352-1, 2, 3, & 4, Containment Pressure Wide Range Indicators on CR-57 and DETERMINE Containment pressure less than 14 psig, and stable or lowering.
Examiner Cue:      Containment pressure is lowering.
Comment:                                                          SAT      UNSAT Perform Step: 2a  Verify at least 2 Containment Emergency Cooling Units operating.
Standard:          OBSERVE 2HS-9953-1, Containment ECU 2E399 red START light illuminated.
Comment:                                                          SAT      UNSAT Perform Step: 2b  Verify at least 2 Containment Emergency Cooling Units operating.
Standard:         OBSERVE 2HS-9947-1, Containment ECU 2E401 green STOP light illuminated.
Comment:                                                          SAT      UNSAT Perform Step: 2c  Verify at least 2 Containment Emergency Cooling Units operating.
Standard:          OBSERVE 2HS-9955-2, Containment ECU 2E402 green STOP light illuminated.
Comment:                                                          SAT      UNSAT Perform Step: 2d  Verify at least 2 Containment Emergency Cooling Units operating.
Standard:          OBSERVE 2HS-9939-2, Containment ECU 2E400 green STOP light illuminated.
Comment:                                                          SAT      UNSAT Page 3 of 8              SONGS Oct 2009 NRC JPM S-5 Rev 0.doc


Appendix C JPM STEPS Form ES-C-1 Page 3 of 8 SONGS Oct 2009 NRC JPM S-5 Rev 0.doc  - Check Mark Denotes Critical Step START TIME:
Appendix C                           JPM STEPS                             Form ES-C-1 Examiner Note:   The following steps represent the alternate path for this JPM.
Perform Step: 1 Verify Containment pressure -
less than 14 psig, and -
stable or lowering.
Standard: OBSERVE 2PI-0351-1, 2, 3, & 4, Containment Pressure Narrow Range Indicators on CR-57 or 2PI-0352-1, 2, 3, & 4, Containment Pressure Wide Range Indicators on CR-57 and DETERMINE Containment pressure less than 14 psig, and stable or lowering. Examiner Cue: Containment pressure is lowering.
Comment: SAT      UNSAT      Perform Step: 2a Verify at least 2 Containment Emergency Cooling Units operating.
Standard: OBSERVE 2HS-9953-1, Containment ECU 2E399 red START light illuminated.
Comment: SAT      UNSAT      Perform Step: 2b Verify at least 2 Containment Emergency Cooling Units operating.
Standard: OBSERVE 2HS-9947-1, Containment ECU 2E401 green STOP light illuminated.
Comment: SAT      UNSAT      Perform Step: 2c Verify at least 2 Containment Emergency Cooling Units operating.
Standard: OBSERVE 2HS-9955-2, Containment ECU 2E402 green STOP light illuminated.
Comment: SAT      UNSAT      Perform Step: 2d Verify at least 2 Containment Emergency Cooling Units operating.
Standard: OBSERVE 2HS-9939-2, Containment ECU 2E400 green STOP light illuminated.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 4 of 8 SONGS Oct 2009 NRC JPM S-5 Rev 0.doc Examiner Note: The following steps represen t the alternate path for this JPM.
Perform Step: 3  With only Containment Emergency Cooling Unit E399 operating the RNO must be entered.
Perform Step: 3  With only Containment Emergency Cooling Unit E399 operating the RNO must be entered.
Standard: RECOGNIZE that the AER column is not met and ENTER the RNO column due to only one Containment Emergency Cooling Unit operating.
Standard:       RECOGNIZE that the AER column is not met and ENTER the RNO column due to only one Containment Emergency Cooling Unit operating.
Comment: SAT     UNSAT     Perform Step: 4a Ensure CSAS -
Comment:                                                       SAT       UNSAT Perform Step: 4a Ensure CSAS - actuated.
actuated.
Standard:       VERIFY that CSAS is actuated and OBSERVE:
Standard: VERIFY that CSAS is actuated and OBSERVE: Annunciator 57A03 - CSAS TRAIN A ACTUATION illuminated. Annunciator 57B03 - CSAS TRAIN B ACTUATION illuminated.
* Annunciator 57A03 - CSAS TRAIN A ACTUATION illuminated.
Comment: SAT     UNSAT     Perform Step: 4b Ensure CSAS -
* Annunciator 57B03 - CSAS TRAIN B ACTUATION illuminated.
actuated.
Comment:                                                       SAT       UNSAT Perform Step: 4b Ensure CSAS - actuated.
Standard: VERIFY that Train A CSAS is actuated and OBSERVE: 2HS-9395-1, Containment Spra y Pump 2P012 red START light illuminated and ammeter at approximately 45 amps. 2HV-9367, CNTMT Spray HDR No 1 Control Valve red JOG OPEN illuminated with valve position indication 100% OPEN.
Standard:       VERIFY that Train A CSAS is actuated and OBSERVE:
Comment: SAT     UNSAT     Perform Step: 4c Ensure CSAS -
* 2HS-9395-1, Containment Spray Pump 2P012 red START light illuminated and ammeter at approximately 45 amps.
actuated.
* 2HV-9367, CNTMT Spray HDR No 1 Control Valve red JOG OPEN illuminated with valve position indication 100% OPEN.
Standard: VERIFY that Train B CSAS is actuated and OBSERVE: 2HS-9396-2, Containment Spra y Pump 2P013 red START light illuminated and ammeter at approximately 58 amps. 2HV-9368, CNTMT Spray HDR No 2 Control Valve red JOG OPEN illuminated with valve position indication 100% OPEN.
Comment:                                                       SAT       UNSAT Perform Step: 4c Ensure CSAS - actuated.
Comment: SAT     UNSAT Appendix C JPM STEPS Form ES-C-1 Page 5 of 8 SONGS Oct 2009 NRC JPM S-5 Rev 0.doc Perform Step: 5 Close CCW to/from Letdown H eat Exchanger Valves:  Train A - HV-6293B/A Standard: DEPRESS 2HV-6293B/A, CCW CLA LT DN HX 2E062 Supply/Return Valves CLOSE pushbutton and OBSERVE green CLOSE light illuminated.
Standard:       VERIFY that Train B CSAS is actuated and OBSERVE:
Comment: SAT      UNSAT      Perform Step: 6 Close CCW to/from Letdown H eat Exchanger Valves:  Train B - HV-6522B/A Standard: OBSERVE 2HV-6522B/A, CCW CLB LTDN HX 2E062 Supply/Return Valves green CLOSE light illuminated.
* 2HS-9396-2, Containment Spray Pump 2P013 red START light illuminated and ammeter at approximately 58 amps.
Comment: SAT      UNSAT      Perform Step: 7 GO TO next applicable floating step.
* 2HV-9368, CNTMT Spray HDR No 2 Control Valve red JOG OPEN illuminated with valve position indication 100% OPEN.
Standard:
Comment:                                                       SAT       UNSAT Page 4 of 8           SONGS Oct 2009 NRC JPM S-5 Rev 0.doc
GO TO next applicable floating step. Examiner Cue: The Control Room Supervisor directs you to perform Floating Step 24, Transfer Charging Pump Suction.
Comment: SAT      UNSAT      Examiner Cue: PROVIDE copy of Floa ting Step 24, Transfer Charging Pump Suction. Perform Step: 8 VERIFY elapsed time from SIAS actuat ion - greater than 1-1/2 hours.
Standard: DETERMINE elapsed time from SIAS actuation greater than 1-1/2 hours from Initial Conditions.
Comment: SAT      UNSAT      Perform Step: 9 VERIFY elapsed time from SIAS ac tuation - less than 2 hours.
Standard: DETERMINE elapsed time from SI AS actuation less than 2 hours from Initial Conditions.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 6 of 8 SONGS Oct 2009 NRC JPM S-5 Rev 0.doc Perform Step: 10 VERIFY RWST level - greater than 6%.
Standard:
OBSERVE 2LI-0305-1 through 4, RWT 2T006 Level, and DETERMINE level greater than 6%.
Comment: SAT      UNSAT      Perform Step: 11 ENSURE LV-0227C, RWST to Charging Pumps Gravity Feed Valve -
open. Standard: OBSERVE 2LV-0227C, RWT 2T006 Gravity Feed Valve red OPEN and blue MANUAL lights illuminated.
Comment: SAT      UNSAT      Perform Step: 12 OVERRIDE and STOP BAMU Pumps.
Standard:
DEPRESS 2P174, BAMU Pump OVERRIDE then STOP pushbuttons and OBSERVE green STOP and white OVERRIDE lights illuminated.
Comment: SAT      UNSAT      Perform Step: 13  OVERRIDE and STOP BAMU Pumps.
Standard:
DEPRESS 2P175, BAMU Pump OVERRIDE then STOP pushbuttons and OBSERVE green STOP and white OVERRIDE lights illuminated.
Comment: SAT      UNSAT      Perform Step: 14 OVERRIDE and CLOSE boration valves:  Gravity Feed:  HV-9235 Standard:
DEPRESS 2HV-9235, BAMU TK 2T072 Gravity Feed Valve OVERRIDE then CLOSE pushbuttons and OBSERVE green CLOSE and white OVERRIDE lights illuminated.
Comment: SAT      UNSAT      Perform Step: 15 OVERRIDE and CLOSE boration valves:  Gravity Feed:  HV-9240 Standard:
DEPRESS 2HV-9240, BAMU TK 2T071 Gravity Feed Valve OVERRIDE then CLOSE pushbuttons and OBSERVE green CLOSE and white OVERRIDE lights illuminated.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 7 of 8 SONGS Oct 2009 NRC JPM S-5 Rev 0.doc Perform Step: 16 OVERRIDE and CLOSE boration valves:  Emergency Boration Isolation:  HV-9247 Standard: DEPRESS 2HV-9247, EMER Boration Block Valve OVERRIDE then CLOSE pushbuttons and OBSER VE green CLOSE and white OVERRIDE lights illuminated.
Comment: SAT      UNSAT      Perform Step: 17 Ensure LV-0227B, Volume Control Tank Outlet valve - closed.
Standard: OBSERVE 2LV-0227B, Volume Control Tank Outlet Block Valve green CLOSE and blue MANUAL lights illuminated. Terminating Cue: This JPM is complete.
Comment: SAT      UNSAT      STOP TIME:
Appendix C JPM CUE SHEET Form ES-C-1 Page 8 of 8 SONGS Oct 2009 NRC JPM S-5 Rev 0.doc INITIAL CONDITIONS: Given the following conditions:  A Loss of Coolant Accident inside Containment has occurred. SO23-12-11, EOI Supporting Atta chments, Attachment 2, Floating Steps, is being performed 105 minutes after the accident.


INITIATING CUE: The Control Room Supervisor directs you to PERFORM SO23-12-11, EOI Supporting Attachme nts, Floating Step 14, Terminate Containment Spray Operation.  
Appendix C                            JPM STEPS                          Form ES-C-1 Perform Step: 5 Close CCW to/from Letdown Heat Exchanger Valves:
* Train A - HV-6293B/A Standard:        DEPRESS 2HV-6293B/A, CCW CLA LTDN HX 2E062 Supply/Return Valves CLOSE pushbutton and OBSERVE green CLOSE light illuminated.
Comment:                                                      SAT      UNSAT Perform Step: 6  Close CCW to/from Letdown Heat Exchanger Valves:
* Train B - HV-6522B/A Standard:        OBSERVE 2HV-6522B/A, CCW CLB LTDN HX 2E062 Supply/Return Valves green CLOSE light illuminated.
Comment:                                                      SAT      UNSAT Perform Step: 7  GO TO next applicable floating step.
Standard:        GO TO next applicable floating step.
Examiner Cue:    The Control Room Supervisor directs you to perform Floating Step 24, Transfer Charging Pump Suction.
Comment:                                                      SAT      UNSAT Examiner Cue:    PROVIDE copy of Floating Step 24, Transfer Charging Pump Suction.
Perform Step: 8  VERIFY elapsed time from SIAS actuation - greater than 1-1/2 hours.
Standard:        DETERMINE elapsed time from SIAS actuation greater than 1-1/2 hours from Initial Conditions.
Comment:                                                      SAT      UNSAT Perform Step: 9  VERIFY elapsed time from SIAS actuation - less than 2 hours.
Standard:        DETERMINE elapsed time from SIAS actuation less than 2 hours from Initial Conditions.
Comment:                                                      SAT      UNSAT Page 5 of 8            SONGS Oct 2009 NRC JPM S-5 Rev 0.doc


Appendix C JPM WORKSHEET Form ES-C-1 Page 1 of 8 SONGS Oct 2009 NRC JPM S-6 Rev 0.doc Facility: SONGS JPM # RO/SRO NRC S-6 Task #186551 K/A #062.A4.01  3.3 / 3.1 SF-6Title: Restore Bus 2A06 From 1E Cross-Tie Operations Examinee (Print):
Appendix C                           JPM STEPS                      Form ES-C-1 Perform Step: 10  VERIFY RWST level - greater than 6%.
Testing Method:
Standard:         OBSERVE 2LI-0305-1 through 4, RWT 2T006 Level, and DETERMINE level greater than 6%.
Simulated Performance:   Classroom:   Actual Performance: X  Simulator: X Plant:   READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue. When you complete the task successfully, the objective for this JPM will be satisfied.
Comment:                                                    SAT    UNSAT Perform Step: 11 ENSURE LV-0227C, RWST to Charging Pumps Gravity Feed Valve -
Initial Conditions: Bus 2A06 is cross-tied to Bus 3A06 due to planned maintenance.
open.
Initiating Cue: The Control Room Supervisor directs you to RESTORE Bus 2A06 from 1E Cross-Tie operations to the Reserv e Auxiliary Transformer 2XR2 per SO23-6-2, Transferring of 4 kV Buses, Section 6.5, Restoring from 1E 4 kV Bus 2A06 to 3A06 Cross-tie Operation.
Standard:         OBSERVE 2LV-0227C, RWT 2T006 Gravity Feed Valve red OPEN and blue MANUAL lights illuminated.
Task Standard: Locate and correctly perform Critical Steps of SO23-6-2.  
Comment:                                                     SAT    UNSAT Perform Step: 12 OVERRIDE and STOP BAMU Pumps.
Standard:         DEPRESS 2P174, BAMU Pump OVERRIDE then STOP pushbuttons and OBSERVE green STOP and white OVERRIDE lights illuminated.
Comment:                                                     SAT    UNSAT Perform Step: 13 OVERRIDE and STOP BAMU Pumps.
Standard:        DEPRESS 2P175, BAMU Pump OVERRIDE then STOP pushbuttons and OBSERVE green STOP and white OVERRIDE lights illuminated.
Comment:                                                    SAT    UNSAT Perform Step: 14 OVERRIDE and CLOSE boration valves:
* Gravity Feed: HV-9235 Standard:         DEPRESS 2HV-9235, BAMU TK 2T072 Gravity Feed Valve OVERRIDE then CLOSE pushbuttons and OBSERVE green CLOSE and white OVERRIDE lights illuminated.
Comment:                                                    SAT    UNSAT Perform Step: 15 OVERRIDE and CLOSE boration valves:
* Gravity Feed: HV-9240 Standard:        DEPRESS 2HV-9240, BAMU TK 2T071 Gravity Feed Valve OVERRIDE then CLOSE pushbuttons and OBSERVE green CLOSE and white OVERRIDE lights illuminated.
Comment:                                                     SAT    UNSAT Page 6 of 8            SONGS Oct 2009 NRC JPM S-5 Rev 0.doc


Required Materials: SO23-6-2, Transferring of 4 kV Buses, Rev. 14.
Appendix C                          JPM STEPS                            Form ES-C-1 Perform Step: 16 OVERRIDE and CLOSE boration valves:
* Emergency Boration Isolation: HV-9247 Standard:         DEPRESS 2HV-9247, EMER Boration Block Valve OVERRIDE then CLOSE pushbuttons and OBSERVE green CLOSE and white OVERRIDE lights illuminated.
Comment:                                                    SAT        UNSAT Perform Step: 17  Ensure LV-0227B, Volume Control Tank Outlet valve - closed.
Standard:        OBSERVE 2LV-0227B, Volume Control Tank Outlet Block Valve green CLOSE and blue MANUAL lights illuminated.
Terminating Cue:  This JPM is complete.
Comment:                                                    SAT        UNSAT STOP TIME:
Page 7 of 8            SONGS Oct 2009 NRC JPM S-5 Rev 0.doc


Validation Time: 9 minutes Time Critical: N/A Completion Time: ________ minutes
Appendix C                      JPM CUE SHEET                        Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:
* A Loss of Coolant Accident inside Containment has occurred.
* SO23-12-11, EOI Supporting Attachments, Attachment 2, Floating Steps, is being performed 105 minutes after the accident.
INITIATING CUE:     The Control Room Supervisor directs you to PERFORM SO23-12-11, EOI Supporting Attachments, Floating Step 14, Terminate Containment Spray Operation.
Page 8 of 8        SONGS Oct 2009 NRC JPM S-5 Rev 0.doc


Comments:   Result:  SAT  UNSAT  Examiner (Print / Sign):  Date: 
Appendix C                                    JPM WORKSHEET                                  Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC S-6                Task #186551      K/A #062.A4.01      3.3 / 3.1    SF-6


Appendix C JPM WORKSHEET Form ES-C-1 Page 2 of 8 SONGS Oct 2009 NRC JPM S-6 Rev 0.doc SIMULATOR SETUP
==Title:==
Restore Bus 2A06 From 1E Cross-Tie Operations Examinee (Print):
Testing Method:
Simulated Performance:                                        Classroom:
Actual Performance:              X                            Simulator:      X Plant:
READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.
When you complete the task successfully, the objective for this JPM will be satisfied.
Initial Conditions:      Bus 2A06 is cross-tied to Bus 3A06 due to planned maintenance.
Initiating Cue:          The Control Room Supervisor directs you to RESTORE Bus 2A06 from 1E Cross-Tie operations to the Reserve Auxiliary Transformer 2XR2 per SO23-6-2, Transferring of 4 kV Buses, Section 6.5, Restoring from 1E 4 kV Bus 2A06 to 3A06 Cross-tie Operation.
Task Standard:          Locate and correctly perform Critical Steps of SO23-6-2.
Required Materials: SO23-6-2, Transferring of 4 kV Buses, Rev. 14.
Validation Time:        9 minutes      Time Critical: N/A    Completion Time:    ________ minutes Comments:
Result:  SAT            UNSAT Examiner (Print / Sign):                                                          Date:
Page 1 of 8                       SONGS Oct 2009 NRC JPM S-6 Rev 0.doc


MACHINE OPERATOR
Appendix C                          JPM WORKSHEET                      Form ES-C-1 SIMULATOR SETUP MACHINE OPERATOR:
: INITIALIZE to IC#236 or any 100% power In itial Condition and PERFORM the following: ALIGN (cross-tie) Bus 2A06 to Bus 3A06 using SO23-6-2, Section 6.4. ENSURE Bus 2A06 & Bus 3A06 AUTO/MANUAL Bus Tie Selector Switches are in MANUAL. NOTE: After each JPM, PLACE Sync Switch key in the Non-ESF Sync Master keylock on the vertical section of CR-63.  
INITIALIZE to IC#236 or any 100% power Initial Condition and PERFORM the following:
* ALIGN (cross-tie) Bus 2A06 to Bus 3A06 using SO23-6-2, Section 6.4.
* ENSURE Bus 2A06 & Bus 3A06 AUTO/MANUAL Bus Tie Selector Switches are in MANUAL.
NOTE: After each JPM, PLACE Sync Switch key in the Non-ESF Sync Master keylock on the vertical section of CR-63.
EXAMINER:
PROVIDE the examinee with a copy of:
* SO23-6-2, Transferring of 4 kV Buses.
Page 2 of 8              SONGS Oct 2009 NRC JPM S-6 Rev 0.doc


EXAMINER: PROVIDE the examinee with a copy of:  SO23-6-2, Transfe rring of 4 kV Buses.
Appendix C                              JPM STEPS                                Form ES-C-1
- Check Mark Denotes Critical Step                      START TIME:
Perform Step: 1    Ensure the affected Switchgear Room is clear of all unnecessary personnel and maintain it clear until after 4kV bus transfer is complete Standard:          DIRECT a PEO to clear the Switchgear Room and keep personnel clear until the bus transfer is complete.
M.O. Cue:          All personnel are clear of the Switchgear Room.
Comment:                                                            SAT      UNSAT Perform Step: 2a  Prepare to Close the INCOMING Transformer breaker, as follows:
* SELECT 2HS-1627-2, ESF B Sync. Master Control, to ON.
Standard:          INSERT key and TURN 2HS-1627-2, TRAIN B SYNC CKT CONTROL ESF B SYNC MASTER to the ON position.
Comment:                                                            SAT      UNSAT Perform Step: 2b Prepare to Close the INCOMING Transformer breaker, as follows:
* DEPRESS the SYNC pushbutton for the INCOMING Transformer breaker to energize the synchronizing circuit:
2A0618, 2XR2 Reserve Aux. Transformer Standard:          DEPRESS 2HS-1637-2, RES AUX XFMR 2XR2 FDR BREAKER 2A0618 SYNC pushbutton.
Comment:                                                            SAT      UNSAT Perform Step: 2c  Prepare to Close the INCOMING Transformer breaker, as follows:
* Verify ILLUMINATED the INCOMING Transformer Breaker SYNC pushbutton.
Standard:          OBSERVE 2HS-1637-2, RES AUX XFMR 2XR2 FDR BREAKER 2A0618 white SYNC light illuminated.
Comment:                                                            SAT      UNSAT Page 3 of 8              SONGS Oct 2009 NRC JPM S-6 Rev 0.doc


Appendix C JPM STEPS Form ES-C-1 Page 3 of 8 SONGS Oct 2009 NRC JPM S-6 Rev 0.doc  - Check Mark Denotes Critical Step START TIME:
Appendix C                           JPM STEPS                           Form ES-C-1 Perform Step: 2d Prepare to Close the INCOMING Transformer breaker, as follows:
Perform Step: 1 Ensure the affected Switchgear Room is clear of all unnecessary personnel and maintain it clear until after 4kV bus transfer is complete Standard:
* VERIFY ILLUMINATED the SYNC IN MODE light.
DIRECT a PEO to clear the Switc hgear Room and keep personnel clear until the bus transfer is complete. M.O. Cue: All personnel are clear of the Switchgear Room.
Standard:       OBSERVE 2HS-1627-2 ESF B SYNC MASTER white SYNC IN MODE light illuminated on TRAIN B SYNC CKT CONTROL.
Comment: SAT     UNSAT     Perform Step: 2a Prepare to Close the INCOMING Transformer breaker, as follows: SELECT 2HS-1627-2, ESF B Sync. Master Control, to ON.
Comment:                                                     SAT       UNSAT Perform Step: 2e Prepare to Close the INCOMING Transformer breaker, as follows:
Standard:
* VERIFY EXTINGUISHED the SYNC RELAYS TROUBLE light.
INSERT key and TURN 2HS-1627-2, TRAIN B SYNC CKT CONTROL ESF B SYNC MASTER to the ON position.
Standard:        OBSERVE 2HS-1627-2, ESF B SYNC MASTER red SYNC RELAYS TROUBLE light extinguished on TRAIN B SYNC CKT CONTROL.
Comment: SAT     UNSAT     Perform Step: 2b Prepare to Close the INCOMING Transformer breaker, as follows: DEPRESS the SYNC pushbutton for the INCOMING Transformer breaker to energize the synchronizing circuit: 2A0618, 2XR2 Reserve Aux. Transformer Standard: DEPRESS 2HS-1637-2, RES AUX XFMR 2XR2 FDR BREAKER
Comment:                                                      SAT        UNSAT Perform Step: 2f Prepare to Close the INCOMING Transformer breaker, as follows:
* VERIFY the Synchroscope moves to the straight up (12 o'clock)
Standard:       VERIFY 2/3SI-1627A, SYNCHROSCOPE moves to straight up (12 o'clock) position.
Comment:                                                     SAT       UNSAT Perform Step: 2g Prepare to Close the INCOMING Transformer breaker, as follows:
* VERIFY matched Incoming and Running voltages.
Standard:        OBSERVE 2/3EI-1627A, RUNNING VOLTS and 2/3EI-1627B, INCOMING VOLTS voltmeters MATCHED.
Comment:                                                      SAT        UNSAT Perform Step: 2h Prepare to Close the INCOMING Transformer breaker, as follows:
* VERIFY MATCHED Incoming and Running Frequencies.
Standard:       OBSERVE 2/3SI-1627C, RUNNING HERTZ and 2/3SI-1627D, INCOMING HERTZ frequency meters MATCHED.
Comment:                                                      SAT        UNSAT Page 4 of 8            SONGS Oct 2009 NRC JPM S-6 Rev 0.doc


2A0618 SYNC pushbutton.
Appendix C                           JPM STEPS                         Form ES-C-1 Perform Step: 3a CLOSE the INCOMING Transformer breaker:
Comment: SAT      UNSAT      Perform Step: 2c Prepare to Close the INCOMING Transformer breaker, as follows:  Verify ILLUMINATED the INCOMING Transformer Breaker        SYNC pushbutton.
* 2A0618, 2XR2 Reserve Aux. Transformer Standard:         DEPRESS 2HS-1637-2, RES AUX XFMR 2XR2 FDR BREAKER 2A0618 CLOSE pushbutton and OBSERVE red CLOSE light illuminated and green TRIP light extinguished.
Standard: OBSERVE 2HS-1637-2, RES AUX XFMR 2XR2 FDR BREAKER 2A0618 white SYNC light illuminated.
Comment:                                                         SAT UNSAT Perform Step: 3b VERIFY ANNUNCIATED 2UA63C58, 2A06/3A06 PARALLELED.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 4 of 8 SONGS Oct 2009 NRC JPM S-6 Rev 0.doc Perform Step: 2d Prepare to Close the INCOMING Transformer breaker, as follows: VERIFY ILLUMINATED the SYNC IN MODE light.
Standard:         OBSERVE and ACKNOWLEDGE annunciator 2UA63C58 - 2A06/3A06 PARALLELED.
Standard: OBSERVE 2HS-1627-2 ESF B SYNC MASTER white SYNC IN MODE light illuminated on TRAIN B SYNC CKT CONTROL.
Comment:                                                         SAT UNSAT Perform Step: 3c VERIFY 3UA63C58, 3A06/2A06 PARALLELED, REMAINS ANNUNCIATED.
Comment: SAT      UNSAT      Perform Step: 2e Prepare to Close the INCOMING Transformer breaker, as follows:  VERIFY EXTINGUISHED the SYNC RELAYS TROUBLE light.
Standard:         OBSERVE annunciator 3UA63C58 - 3A06/2A06 PARALLELED illuminated.
Standard: OBSERVE 2HS-1627-2, ESF B SY NC MASTER red SYNC RELAYS TROUBLE light extinguished on TRAIN B SYNC CKT CONTROL.
Examiner Cue:    The annunciator is illuminated.
Comment: SAT     UNSAT     Perform Step: 2f Prepare to Close the INCOMING Transformer breaker, as follows: VERIFY the Synchroscope moves to the straight up (12 o'clock)
Comment:                                                         SAT UNSAT Perform Step: 4a  DEPRESS the SYNC pushbutton for the INCOMING Transformer breaker to de-energize the synchronizing circuit:
Standard: VERIFY 2/3SI-1627A, SYNCHROSCOPE moves to straight up (12 o'clock) position.
* 2A0618, 2XR2 Reserve Aux. Transformer Standard:         DEPRESS 2HS-1637-2, RES AUX XFMR 2XR2 FDR BREAKER 2A0618 SYNC pushbutton.
Comment: SAT      UNSAT      Perform Step: 2g Prepare to Close the I NCOMING Transformer breaker, as follows:  VERIFY matched Incoming and Running voltages.
Comment:                                                         SAT UNSAT Perform Step: 4b  VERIFY EXTINGUISHED the INCOMING Transformer breaker SYNC pushbutton.
Standard:
Standard:         OBSERVE 2HS-1637-2, RES AUX XFMR 2XR2 FDR BREAKER 2A0618 white SYNC light extinguished.
OBSERVE 2/3EI-1627A, RUNNING VOLTS and 2/3EI-1627B, INCOMING VOLTS voltmeters MATCHED.
Comment:                                                         SAT UNSAT Page 5 of 8            SONGS Oct 2009 NRC JPM S-6 Rev 0.doc
Comment: SAT     UNSAT     Perform Step: 2h Prepare to Close the I NCOMING Transformer breaker, as follows: VERIFY MATCHED Incoming and Running Frequencies.
Standard: OBSERVE 2/3SI-1627C, RUNNING HERTZ and 2/3SI-1627D, INCOMING HERTZ frequency meters MATCHED.
Comment: SAT     UNSAT Appendix C JPM STEPS Form ES-C-1 Page 5 of 8 SONGS Oct 2009 NRC JPM S-6 Rev 0.doc Perform Step: 3a CLOSE the INCOMING Transformer breaker: 2A0618, 2XR2 Reserve Aux. Transformer Standard: DEPRESS 2HS-1637-2, RES AUX XFMR 2XR2 FDR BREAKER 2A0618 CLOSE pushbutton and OBSER VE red CLOSE light illuminated and green TRIP light extinguished.
Comment: SAT     UNSAT     Perform Step: 3b VERIFY ANNUNCIATED 2UA63C58, 2A06/3A06 PARALLELED.
Standard:
OBSERVE and ACKNOWLEDGE annunciator 2UA63C58 - 2A06/3A06 PARALLELED.
Comment: SAT     UNSAT     Perform Step: 3c VERIFY 3UA63C58, 3A06/2A06 PARALLELED, REMAINS


ANNUNCIATED.
Appendix C                          JPM STEPS                          Form ES-C-1 Perform Step: 5a OPEN (TRIP) 2A0619, Bus Tie 2A06 to 3A06 Feeder Breaker.
Standard: OBSERVE annunciator 3UA63C58 - 3A06/2A06 PARALLELED illuminated. Examiner Cue: The annunci ator is illuminated.
Standard:        DEPRESS 2HS-1639A2, BUS TIE 2A06 TO 3A06 FDR BKR 2A0619 TRIP pushbutton and OBSERVE green TRIP light illuminated and red CLOSE light extinguished.
Comment: SAT      UNSAT     Perform Step: 4a DEPRESS the SYNC pushbutton for the INCOMING Transformer breaker to de-energize the synchronizing circuit2A0618, 2XR2 Reserve Aux. Transformer Standard: DEPRESS 2HS-1637-2, RES AUX XFMR 2XR2 FDR BREAKER  
Comment:                                                    SAT      UNSAT Perform Step: 5b  VERIFY RESET 2UA63C58, 2A06/3A06 PARALLELED.
Standard:        OBSERVE annunciator 2UA63C58 - 2A06/3A06 PARALLELED is slow flashing/reset.
Comment:                                                    SAT      UNSAT Perform Step: 5c  VERIFY RESET 3UA63C58, 3A06/2A06 PARALLELED.
Standard:         OBSERVE annunciator 3UA63C58 - 3A06/2A06 PARALLELED is slow flashing/reset.
Examiner Cue:     The annunciator is reset.
Comment:                                                     SAT      UNSAT Perform Step: 6  SELECT 2HS-1627-2, ESF B Sync. Master Control, to OFF.
Standard:        TURN key 2HS-1627-2, TRAIN B SYNC CKT CONTROL ESF B SYNC MASTER to the OFF position.
Comment:                                                    SAT      UNSAT Perform Step: 7  Verify bus 2A06 voltage is stable.
Standard:        OBSERVE 2EI-1641-2, 4.16 KV BUS 2A06 VOLTS voltmeter and VERIFY stable.
Comment:                                                    SAT      UNSAT Perform Step: 8 OPEN (TRIP) 3A0603, Bus Tie 3A06 to 2A06 Feeder Breaker.
Standard:         DEPRESS 3HS-1639A2, BUS TIE 3A06 TO 2A06 FDR BREAKER 3A0603 TRIP pushbutton and OBSERVE green TRIP light illuminated and red CLOSE light extinguished.
Comment:                                                    SAT      UNSAT Page 6 of 8            SONGS Oct 2009 NRC JPM S-6 Rev 0.doc


2A0618 SYNC pushbutton.
Appendix C                           JPM STEPS                             Form ES-C-1 Perform Step: 9a Return Bus Tie Breakers transfer controls to automatic, as follows:
Comment: SAT      UNSAT      Perform Step: 4b VERIFY EXTINGUISHED the INCOMING Transformer breaker SYNC pushbutton.
* SELECT 3HS-1639B2, 3A06 to 2A06 Tie Breaker 3A0603 AUTO/MANUAL Transfer Switch, to AUTO.
Standard: OBSERVE 2HS-1637-2, RES AUX XFMR 2XR2 FDR BREAKER 2A0618 white SYNC li ght extinguished.
Standard:         DEPRESS 3HS-1639B2, BUS TIE 3A06 TO 2A06 FDR BKR 3A0603 SELECTOR AUTO pushbutton and OBSERVE white AUTO light illuminated and blue MANUAL light extinguished.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 6 of 8 SONGS Oct 2009 NRC JPM S-6 Rev 0.doc Perform Step: 5a OPEN (TRIP) 2A0619, Bus Tie 2A06 to 3A06 Feeder Breaker.
Comment:                                                         SAT       UNSAT Perform Step: 9b Return Bus Tie Breakers transfer controls to automatic, as follows:
Standard:
* SELECT 2HS-1639B2, 2A06 to 3A06 Tie Breaker 2A0619 AUTO/MANUAL Transfer Switch, to AUTO.
DEPRESS 2HS-1639A2, BUS TIE 2A06 TO 3A06 FDR BKR 2A0619 TRIP pushbutton and OBSERVE green TR IP light illuminated and red CLOSE light extinguished.
Standard:         DEPRESS 2HS-1639B2, 2A06 TO 3A06 FDR BKR 2A0619 SELECTOR AUTO pushbutton and OBSERVE white AUTO light illuminated and blue MANUAL light extinguished Terminating Cue: This JPM is complete.
Comment: SAT      UNSAT      Perform Step: 5b VERIFY RESET 2UA63C58, 2A06/3A06 PARALLELED.
Comment:                                                         SAT       UNSAT STOP TIME:
Standard: OBSERVE annunciator 2UA63C58 - 2A 06/3A06 PARALLELED is slow flashing/reset.
Page 7 of 8             SONGS Oct 2009 NRC JPM S-6 Rev 0.doc
Comment: SAT      UNSAT      Perform Step: 5c VERIFY RESET 3UA63C58, 3A06/2A06 PARALLELED.
Standard: OBSERVE annunciator 3UA63C58 - 3A 06/2A06 PARALLELED is slow flashing/reset. Examiner Cue: The annunciator is reset.
Comment: SAT      UNSAT      Perform Step: 6 SELECT 2HS-1627-2, ESF B Sync.
Master Control, to OFF.
Standard: TURN key 2HS-1627-2, TRAIN B SYNC CKT CONTROL ESF B SYNC MASTER to the OFF position.
Comment: SAT      UNSAT      Perform Step: 7 Verify bus 2A06 voltage is stable.
Standard: OBSERVE 2EI-1641-2, 4.16 KV BUS 2A06 VOLTS voltmeter and VERIFY stable.
Comment: SAT      UNSAT      Perform Step: 8 OPEN (TRIP) 3A0603, Bus Tie 3A06 to 2A06 Feeder Breaker.
Standard: DEPRESS 3HS-1639A2, BUS TIE 3A06 TO 2A06 FDR BREAKER 3A0603 TRIP pushbutton and OBSERVE green TRIP light illuminated and red CLOSE light extinguished.
Comment: SAT      UNSAT Appendix C JPM STEPS Form ES-C-1 Page 7 of 8 SONGS Oct 2009 NRC JPM S-6 Rev 0.doc Perform Step: 9a Return Bus Tie Breakers transfer controls to automatic, as follows: SELECT 3HS-1639B2, 3A06 to 2A06 Tie Breaker 3A0603 AUTO/MANUAL Transfer Switch, to AUTO.
Standard:
DEPRESS 3HS-1639B2, BUS TIE 3A06 TO 2A06 FDR BKR 3A0603 SELECTOR AUTO pushbutton and OBSERVE white AUTO light illuminated and blue MANUAL light extinguished.
Comment: SAT     UNSAT       Perform Step: 9b Return Bus Tie Breakers transfer controls to automatic, as follows: SELECT 2HS-1639B2, 2A06 to 3A06 Tie Breaker 2A0619 AUTO/MANUAL Transfer Switch, to AUTO.
Standard: DEPRESS 2HS-1639B2, 2A06 TO 3A06 FDR BKR 2A0619 SELECTOR AUTO pushbutton and OBSERVE white AUTO light illuminated and blue MANUAL light extinguished Terminating Cue: This JPM is complete.
Comment: SAT     UNSAT       STOP TIME:
Appendix C JPM CUE SHEET Form ES-C-1 Page 8 of 8 SONGS Oct 2009 NRC JPM S-6 Rev 0.doc INITIAL CONDITIONS: Bus 2A06 is cross-tied to Bus 3A06 due to planned maintenance.


INITIATING CUE: The Control Room Supervisor directs you to RESTORE Bus 2A06 from 1E Cross-Tie operations to the Reserve Auxiliary Transformer 2XR2 per SO23-6-2, Transferring of 4 kV Buses, Section 6.5, Restoring from 1E 4 kV Bus 2A06 to 3A06 Cross-tie Operation.  
Appendix C                      JPM CUE SHEET                        Form ES-C-1 INITIAL CONDITIONS: Bus 2A06 is cross-tied to Bus 3A06 due to planned maintenance.
INITIATING CUE:     The Control Room Supervisor directs you to RESTORE Bus 2A06 from 1E Cross-Tie operations to the Reserve Auxiliary Transformer 2XR2 per SO23-6-2, Transferring of 4 kV Buses, Section 6.5, Restoring from 1E 4 kV Bus 2A06 to 3A06 Cross-tie Operation.
Page 8 of 8        SONGS Oct 2009 NRC JPM S-6 Rev 0.doc


Appendix D Scenario Outline Form ES-D-1 SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc Facility: SONGS 2 and 3 Scenario No.: 1 Op Test No.: October 2009 NRC Examiners:   Operators:
Appendix D                                     Scenario Outline                                     Form ES-D-1 Facility:         SONGS 2 and 3                   Scenario No.:         1     Op Test No.:   October 2009 NRC Examiners:                                                   Operators:
Initial Conditions: 99% power MOC - RCS Boron is 1003 ppm (by sample). Train A Component Cooling Water Pump (P-025) in service. Train A Low Pressure Safety Injection Pump (P-015) OOS for oil change. Train A Emergency Diesel Generator (G-002) OOS for governor repair. Fire Computer is OOS. Turnover: Maintain steady-state power conditions.
Initial Conditions:
Critical Tasks: Trip the Reactor followi ng multiple CEA drops.
* 99% power MOC - RCS Boron is 1003 ppm (by sample).
Trip any Reactor Coolant Pump not satisfying operating limits (Loss of CCW).
* Train A Component Cooling Water Pump (P-025) in service.
Establish minimum design Safety Injection flow rate (SIAS component failure). Event No. Malf. No. Event Type* Event Description 1 +10 min CH04D TS (CRS) Containment Wide Range Pressure Transmitter (PT-0352-4) fails high. 2 +20 min FC05B I (BOP, CRS) Steam Generator (E-088) Main Feedwater Master Controller setpoint fails to 50% level on 60 second ramp.
* Train A Low Pressure Safety Injection Pump (P-015) OOS for oil change.
3 +30 min RD4403 C (RO, BOP, CRS)
* Train A Emergency Diesel Generator (G-002) OOS for governor repair.
TS (CRS) Dropped CEA #44.
* Fire Computer is OOS.
4 +45 min R (RO)
Turnover:             Maintain steady-state power conditions.
N (BOP, CRS) Power reduction for dropped CEA.
Critical Tasks:
5 +45 min RD0303 C (RO, CRS) Dropped CEA #3. Manual Reactor trip required.
* Trip the Reactor following multiple CEA drops.
6 +50 min RC01A M (RO, BOP, CRS)
* Trip any Reactor Coolant Pump not satisfying operating limits (Loss of CCW).
 
* Establish minimum design Safety Injection flow rate (SIAS component failure).
Large Break Loss of Coolant Accident upon Unit trip.
Event No.     Malf. No.     Event Type*                                   Event Description 1       CH04D       TS (CRS)               Containment Wide Range Pressure Transmitter (PT-0352-4) fails
7 +50 min Bus 2A07 XFR LP I (BOP) Non-1E 4160 Volt Bus 2A07 auto transfer failure upon Unit trip.
+10 min                                          high.
8 +55 min RP01E C (RO) Low Pressure Safety Injection Pump (P-016) fails to auto start. * (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor,   (TS)Technical Specifications  
2       FC05B       I (BOP, CRS)           Steam Generator (E-088) Main Feedwater Master Controller
+20 min                                          setpoint fails to 50% level on 60 second ramp.
3       RD4403     C (RO, BOP, CRS) Dropped CEA #44.
+30 min                 TS (CRS) 4                  R (RO)                 Power reduction for dropped CEA.
+45 min                 N (BOP, CRS) 5      RD0303     C (RO, CRS)             Dropped CEA #3. Manual Reactor trip required.
+45 min 6      RC01A       M (RO, BOP, CRS) Large Break Loss of Coolant Accident upon Unit trip.
+50 min 7      Bus 2A07   I (BOP)                 Non-1E 4160 Volt Bus 2A07 auto transfer failure upon Unit trip.
+50 min     XFR LP 8      RP01E       C (RO)                 Low Pressure Safety Injection Pump (P-016) fails to auto start.
+55 min
    *   (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,     (M)ajor, (TS)Technical Specifications SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc


Appendix D Scenario Outline Form ES-D-1 SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc SCENARIO  
Appendix D                                 Scenario Outline                               Form ES-D-1 SCENARIO  


==SUMMARY==
==SUMMARY==
NRC #1 The crew will assume the watch and maintain steady-state conditions per Operating Instruction (OI) SO23-5-1.7, Power Operations.  
NRC #1 The crew will assume the watch and maintain steady-state conditions per Operating Instruction (OI)
 
SO23-5-1.7, Power Operations.
The first event is a Containment Wide Range Pressure Transmitter failure. The crew will respond per Abnormal Operating Instruction (AOI) SO23-13-18, Reactor Protection System Failure/Loss of Vital Bus and Operating Instruction (OI) SO23-3-2.12, Reactor Protective System Operation. The CRS will evaluate Technical Specifications.  
The first event is a Containment Wide Range Pressure Transmitter failure. The crew will respond per Abnormal Operating Instruction (AOI) SO23-13-18, Reactor Protection System Failure/Loss of Vital Bus and Operating Instruction (OI) SO23-3-2.12, Reactor Protective System Operation. The CRS will evaluate Technical Specifications.
 
When Technical Specification actions are complete, Steam Generator E-088 Master Controller Setpoint fails to 50%. Entry into AOI SO23-13-24, Feedwater Control System Malfunction is required. The CRS will analyze the cause of the failure using Attachment 1 of SO23-13-24. Steam Generator level control is restored by placing the Master Controller in Manual. When Steam Generator level control is achieved the controller will be returned to automatic operation.
When Technical Specification actions are complete, Steam Generator E-088 Master Controller Setpoint fails to 50%. Entry into AOI SO23-13-24, Feedwater Control System Malfunction is required. The CRS will analyze the cause of the failure using Attachment 1 of SO23-13-24. Steam Generator level control is restored by placing the Master Controller in Manual. When Steam Generator level control is achieved the controller will be returned to automatic operation.  
When level control is regained, Control Element Assembly #44 will drop into the core. Crew actions are per AOI SO23-13-13, Misaligned or Immovable Control Element Assembly and include a power reduction as required per procedure. The crew will restore RCS Cold Leg temperature per OI SO23-5-1.7, Power Operations and block any further load changes and then continue with a power reduction as required per SO23-13-13. The CRS will evaluate Technical Specifications.
 
When the crew commences recovery of CEA #44, a second Control Element Assembly will drop into the core necessitating a manual Reactor trip.
When level control is regained, Control Element Assembly #44 will drop into the core. Crew actions are per AOI SO23-13-13, Misaligned or Immovable Control Element Assembly and include a power reduction as required per procedure. The crew will restore RCS Cold Leg temperature per OI SO23-5-1.7, Power Operations and block any further load changes and then continue with a power reduction as required per SO23-13-13. The CRS will evaluate Technical Specifications.  
When the Reactor is tripped, a Large Break Loss of Coolant Accident will occur. The crew will enter Emergency Operating Instruction (EOI) SO23-12-1, Standard Post Trip Actions and then transition to EOI SO23-12-3, Loss of Coolant Accident. Post trip events include a Non-1E 4160 Volt Bus that fails to transfer as well as a Low Pressure Safety Injection Pump start failure. Both of these failures require actions on the part of the Reactor and Balance of Plant Operators.
 
The scenario is terminated when conditions for reactor coolant system cooldown is reached.
When the crew commences recovery of CEA #44, a second Control Element Assembly will drop into the core necessitating a manual Reactor trip.
 
When the Reactor is tripped, a Large Break Loss of Coolant Accident will occur. The crew will enter Emergency Operating Instruction (EOI) SO23-12-1, Standard Post Trip Actions and then transition to EOI SO23-12-3, Loss of Coolant Accident. Post trip events include a Non-1E 4160 Volt Bus that fails to transfer as well as a Low Pressure Safety Injection Pump start failure. Both of these failures require actions on the part of the Reactor and Balance of Plant Operators.  
 
The scenario is terminated when conditions for reactor coolant system cooldown is reached.  
 
Risk Significance:
Risk Significance:
Risk important components out of service: LPSI Pump (P-015)
* Risk important components out of service:           LPSI Pump (P-015)
Emergency Diesel Generator (G-002)
Emergency Diesel Generator (G-002)
Failure of risk important system prior to trip: Dropped Control Element Assembly Risk significant core damage sequence: Large Break LOCA Risk significant operator actions: Trip Reactor Following Multiple CEA Drop Trip RCPs Due to Loss of CCW Establish Minimum Safety Injection Flowrate  
* Failure of risk important system prior to trip:     Dropped Control Element Assembly
* Risk significant core damage sequence:             Large Break LOCA
* Risk significant operator actions:                 Trip Reactor Following Multiple CEA Drop Trip RCPs Due to Loss of CCW Establish Minimum Safety Injection Flowrate SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc


Scenario Event Description NRC Scenario #1 SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc SONGS 2009 Facility NRC Initial License Examination Simulator Scenario Setup Machine Operator: EXECUTE IC #221 and NRC Scenario #1 SETUP file to align components. HANG Control Board Tags on P-015 and G-002. CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario boron concentration. VERIFY both Pressurizer Spray Valves in AUTO.
Scenario Event Description NRC Scenario #1 SONGS 2009 Facility NRC Initial License Examination Simulator Scenario Setup Machine Operator:   EXECUTE IC #221 and NRC Scenario #1 SETUP file to align components.
HANG Control Board Tags on P-015 and G-002.
CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario boron concentration.
VERIFY both Pressurizer Spray Valves in AUTO.
PLACE 2G002 EDG in MAINTENANCE LOCKOUT.
PLACE 2G002 EDG in MAINTENANCE LOCKOUT.
PLACE procedures in progress on the RO desk: - Copy of SO32-5-1.7, Power Operations open to Section 6.1, Guidelines for Steady State Operation.
PLACE procedures in progress on the RO desk:
                    - Copy of SO32-5-1.7, Power Operations open to Section 6.1, Guidelines for Steady State Operation.
PLACE the MOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board.
PLACE the MOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board.
Control Room Annunciators in Alarm
Control Room Annunciators in Alarm:
: 57A51 - SI / ECW TRAIN A INOPERABLE 57A55 - STANDBY POWER SYS TRAIN A INOPERABLE 63B07 - DIESEL GEN 2G002 LOCKOUT RELAY TRIPPED  
57A51 - SI / ECW TRAIN A INOPERABLE 57A55 - STANDBY POWER SYS TRAIN A INOPERABLE 63B07 - DIESEL GEN 2G002 LOCKOUT RELAY TRIPPED SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 1 Page 4 of 18 Event
Appendix D                                         Operator Action                           Form ES-D-2 Operating Test :       NRC         Scenario #     1     Event #             1       Page 4   of 18 Event


== Description:==
== Description:==
Containment Wide Range Pressure Transmitter Failure Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc Machine Operator: When directed, EXECUTE Event 1. - CH04D, Containment Pressure Transmitter (PT-0352-4) fails high.
Containment Wide Range Pressure Transmitter Failure Time         Position                               Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 1.
Indications Available
                          - CH04D, Containment Pressure Transmitter (PT-0352-4) fails high.
: 56A08 - CTMT PRESS HI-HI ESFAS CHANNEL TRIP 56A18 - CTMT PRESS HI-HI ESFAS PRETRIP 56B36 - PPS CHANNEL 4 TROUBLE  
Indications Available:
  + 1 min RO REFER to Annunciator Response Procedures.
56A08 - CTMT PRESS HI-HI ESFAS CHANNEL TRIP 56A18 - CTMT PRESS HI-HI ESFAS PRETRIP 56B36 - PPS CHANNEL 4 TROUBLE
RO RECOGNIZE Containment Pressure Channel failure and INFORM the CRS AOI SO23-13-18 entry required.
  + 1 min           RO       REFER to Annunciator Response Procedures.
CRS DIRECT performance of AOI SO23-13-18, Reactor Protection System  
RECOGNIZE Containment Pressure Channel failure and INFORM the CRS RO AOI SO23-13-18 entry required.
DIRECT performance of AOI SO23-13-18, Reactor Protection System CRS Failure/Loss of Vital Bus.
DETERMINE failure by observing instrumentation for the affected channel RO and alternate redundant indications monitoring the same parameter.
RO        IDENTIFY Containment Pressure Channel PT-0352-4 failure.
CRS        REFER to Attachment 5 and DETERMINE Functional Unit(s) affected.
PLACE the affected Functional Unit in BYPASS per SO23-3-2.12, Reactor RO Protection System.
M.O. Cue:        When directed, EXECUTE the following Remote Functions:
RP51 = OPEN            (PPS Door Open Annunciator 56B46)
RP55S = BYPASS (Containment Pressure Channel D)
Delete RP51            (PPS Door Open Annunciator 56B46)
RO        VERIFY the Trip Channel Bypassed Annunciator alarm.
* 56A59 - PPS CHANNEL 4 TRIP BYPASSED.
RO        LOG the BYPASS and reason in the Control Operator Log.
SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc


Failure/Loss of Vital Bus.
Appendix D                                         Operator Action                           Form ES-D-2 Operating Test :       NRC       Scenario #     1       Event #             1       Page 5   of 18 Event
RO DETERMINE failure by observing instrumentation for the affected channel and alternate redundant indications monitoring the same parameter.
RO IDENTIFY Containment Pressure Channel PT-0352-4 failure.
CRS REFER to Attachment 5 and DETERMINE Functional Unit(s) affected.
RO PLACE the affected Functional Unit in BYPASS per SO23-3-2.12, Reactor
 
Protection System.
M.O. Cue: When directed, EXECUTE the following Remote Functions: RP51 = OPEN  (PPS Door Open Annunciator 56B46)
RP55S = BYPASS (Containment Pressure Channel D) Delete RP51  (PPS Door Open Annunciator 56B46)
RO VERIFY the Trip Channel Bypassed Annunciator alarm.
56A59 - PPS CHANNEL 4 TRIP BYPASSED.
RO LOG the BYPASS and reason in the Control Operator Log.
 
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 1 Page 5 of 18 Event


== Description:==
== Description:==
Containment Wide Range Pressure Transmitter Failure Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc CRS INITIATE a LCOAR or follow guidelines of SO123-0-A5.  
Containment Wide Range Pressure Transmitter Failure Time         Position                             Applicants Actions or Behavior CRS       INITIATE a LCOAR or follow guidelines of SO123-0-A5.
  + 10 min CRS EVALUATE Technical Specifications.
  + 10 min         CRS       EVALUATE Technical Specifications.
LCO 3.3.5.A, ESFAS Instrumentation.
* LCO 3.3.5.A, ESFAS Instrumentation.
CONDITION A - One or more Functions with one automatic ESFAS trip channel inoperable. ACTION A.1 - Place Functional Unit in bypass or trip within one (1) hour. When Technical Specifications have been evaluated, or at Lead Evaluator's discretion, PROCEED to Event 2.  
* CONDITION A - One or more Functions with one automatic ESFAS trip channel inoperable.
* ACTION A.1 - Place Functional Unit in bypass or trip within one (1) hour.
When Technical Specifications have been evaluated, or at Lead Evaluators discretion, PROCEED to Event 2.
SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 2 Page 6 of 18 Event
Appendix D                                       Operator Action                             Form ES-D-2 Operating Test :       NRC         Scenario #   1         Event #           2       Page 6   of 18 Event


== Description:==
== Description:==
Steam Generator E088 Master Controller Setpoint Failure Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc Machine Operator: When directed, EXECUTE Event 2. - FC05B, E088 Master Controller Setpoint failure to 50% level on 60 second ramp.
Steam Generator E088 Master Controller Setpoint Failure Time         Position                               Applicants Actions or Behavior Machine Operator:           When directed, EXECUTE Event 2.
Indications available
                            - FC05B, E088 Master Controller Setpoint failure to 50% level on 60 second ramp.
: 52A02 - FWCS SG2 E088 LEVEL DEVIATION 52A13 - FWCS TROUBLE 53B23 - CONDENSATE FLOW BALANCE TROUBLE (possible)
Indications available:
52A02 - FWCS SG2 E088 LEVEL DEVIATION 52A13 - FWCS TROUBLE 53B23 - CONDENSATE FLOW BALANCE TROUBLE (possible)
SG E088 Feedwater Control Valve modulating closed then opens as SG level stabilizes at 50%
SG E088 Feedwater Control Valve modulating closed then opens as SG level stabilizes at 50%
SG E088 level lowering  
SG E088 level lowering
+30 sec BOP REFER to Annunciator Response Procedure.
+30 sec           BOP       REFER to Annunciator Response Procedure.
BOP RECOGNIZE E088 Master Controller Setpoint lowering to 50% and INFORM the CRS AOI SO23-13-24 entry required.
RECOGNIZE E088 Master Controller Setpoint lowering to 50% and INFORM BOP the CRS AOI SO23-13-24 entry required.
CRS DIRECT performance of AOI SO23-13
DIRECT performance of AOI SO23-13-24, Feedwater Control System CRS Malfunctions.
-24, Feedwater Control System Malfunctions.
BOP       DETERMINE that SG E088 level is low.
BOP DETERMINE that SG E088 level is low.
BOP       DETERMINE that SG E088 Master Controller output is lowering.
BOP DETERMINE that SG E088 Master Controller output is lowering.  
  +5 min                     PLACE SG E088 Master Controller in PREFERRED MANUAL and raise BOP output.
+5 min BOP PLACE SG E088 Master Controller in PREFERRED MANUAL and raise  
Floor Cue:       If required, REPORT as Shift Manager to maintain SG level at 67%.
 
BOP       DETERMINE that SG E088 Feed Control Valve is opening.
output. Floor Cue: If required, REPORT as Shift Manager to maintain SG level at 67%.
BOP       DETERMINE that Main Feedwater Pumps K-005 and K-006 speed is rising.
BOP DETERMINE that SG E088 Feed Control Valve is opening.
SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc
BOP DETERMINE that Main Feedwater Pumps K-005 and K-006 speed is rising.  


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 2 Page 7 of 18 Event
Appendix D                                       Operator Action                             Form ES-D-2 Operating Test :       NRC       Scenario #     1         Event #           2       Page 7   of 18 Event


== Description:==
== Description:==
Steam Generator E088 Master Controller Setpoint Failure Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc M.O. Cue: DELETE malfunction and CONTACT the Control Room as I&C. REPORT the controller logic is fixed and the Master Controller may be returned to AUTO.  
Steam Generator E088 Master Controller Setpoint Failure Time         Position                               Applicants Actions or Behavior M.O. Cue:         DELETE malfunction and CONTACT the Control Room as I&C. REPORT the controller logic is fixed and the Master Controller may be returned to AUTO.
+10 min BOP VERIFY SG E088 level is stable at or near program level with SG E088 Master Controller in MANUAL.
VERIFY SG E088 level is stable at or near program level with SG E088
When SG level is restored, or at Lead Evaluator's discretion, PROCEED to Events 3 and 4.  
+10 min          BOP Master Controller in MANUAL.
When SG level is restored, or at Lead Evaluators discretion, PROCEED to Events 3 and 4.
SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 3 and 4 Page 8 of 18 Event
Appendix D                                         Operator Action                             Form ES-D-2 Operating Test :       NRC         Scenario #     1       Event #         3 and 4     Page 8   of 18 Event


== Description:==
== Description:==
Dropped Control Element Assembly #44 / Downpower Due to Dropped CEA Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc Machine Operator: When directed, EXECUTE Events 3 and 4. - RD4403, Dropped Control Element Assembly #44.
Dropped Control Element Assembly #44 / Downpower Due to Dropped CEA Time         Position                               Applicants Actions or Behavior Machine Operator:           When directed, EXECUTE Events 3 and 4.
Indications Available
                            - RD4403, Dropped Control Element Assembly #44.
: 50A02 - COLSS ALARM 50A28 - CEA DEVIATION 50A36 - POWER DEPENDENT INSERTION LIMIT 50A37 - PRE-POWER DEPENDENT INSERTION LIMIT 50A38 - CEA GROUP DEVIATION 50A10 - CEDMCS CEA WITHDRAWAL PROHIBIT 56A03 - LOCAL POWER DENSITY HI CHANNEL TRIP 56A04 - DNBR LO CHANNEL TRIP 56A13 - LOCAL POWER DENSITY HI PRETRIP 56A14 - DNBR LO RPS PRETRIP  
Indications Available:
50A02 - COLSS ALARM 50A28 - CEA DEVIATION 50A36 - POWER DEPENDENT INSERTION LIMIT 50A37 - PRE-POWER DEPENDENT INSERTION LIMIT 50A38 - CEA GROUP DEVIATION 50A10 - CEDMCS CEA WITHDRAWAL PROHIBIT 56A03 - LOCAL POWER DENSITY HI CHANNEL TRIP 56A04 - DNBR LO CHANNEL TRIP 56A13 - LOCAL POWER DENSITY HI PRETRIP 56A14 - DNBR LO RPS PRETRIP CEA #44 Rod Bottom indication
+30 sec                      RECOGNIZE that Regulating Group 5 CEA #44 has dropped and INFORM RO the CRS AOI SO23-13-13 entry required.
DIRECT performance of AOI SO23-13-13, Misaligned or Immovable Control CRS Element Assembly.
RO        VERIFY that no more than one CEA is misaligned > 7 inches.
RO        ENSURE CEDMCS Mode Selector Switch in OFF.
REDUCE Turbine load to restore RCS Tcold to the pre-CEA drop value and BOP BLOCK load changes.
M.O. Cue:        If sent as Radwaste or I&C to investigate CEDMCS, WAIT 5 minutes and REPORT that a tripped breaker was located. REQUEST permission to reclose one time.
RO        VERIFY Reactor is critical.
RECORD initial and stabilized reactor power for subsequent SDM CRS calculation.
Within 15 minutes, DIRECT monitoring of DNBR and LPD per SO23-3-3.6, CRS Attachment for DNBR Margin and Linear Heat Rate Limit Monitoring.
SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc


CEA #44 Rod Bottom indication
Appendix D                                        Operator Action                            Form ES-D-2 Operating Test :        NRC        Scenario #     1      Event #         3 and 4    Page 9    of 18 Event
+30 sec RO RECOGNIZE that Regulating Group 5 CEA #44 has dropped and INFORM the CRS AOI SO23-13-13 entry required.
CRS DIRECT performance of AOI SO23-13-13, Misaligned or Immovable Control


Element Assembly.
== Description:==
RO VERIFY that no more than one CEA is misaligned > 7 inches.
Dropped Control Element Assembly #44 / Downpower Due to Dropped CEA Time          Position                              Applicants Actions or Behavior Floor Cue:        The Work Control Supervisor will complete the DNBR and LPD monitoring in accordance with SO23-3-3.6, Attachment 1.
RO ENSURE CEDMCS Mode Selector Switch in OFF.
CRS      DIRECT performance of Attachment 3, Misaligned CEA Checklist.
BOP REDUCE Turbine load to restore RCS Tcold to the pre-CEA drop value and  
Floor Cue:        The Work Control Supervisor will also complete SO23-3-3.6, Attachment 3.
Within 15 minutes of discovery, DIRECT initiation of Reactor power CRS reduction.
* For Non Group 6 Full Length CEA, REDUCE power 10% within 60 minutes.
Examiner Note:            CRS should recognize that power reduction due to dropped CEA (~3%)
satisfies the 15 minute requirement to initiate a power reduction. The remaining power reduction must be accomplished within 60 minutes.
COMMENCE lowering Turbine Generator load using CVOL while maintaining BOP Tcold per SO23-5-1.7, Power Operations.
DIRECT initiation of boration of the RCS per SO23-3-2.2, Makeup CRS Operations to achieve target power level.
RO       COMMENCE attempting to control ASI near full power ESI.
Floor Cue:        If required, DIRECT CRS as the Shift Manager to commence the downpower.
CRS      REQUEST Reactor Engineering to report to the Control Room.
CRS      INITIATE recovery of affected CEA per Attachment 1.
RO      VERIFY CEA position indications agree:
* COMPARE affected CEA PIDs from CEAC No. 1 and 2 at CPC Operator Console.
SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc


BLOCK load changes.
Appendix D                                         Operator Action                             Form ES-D-2 Operating Test :       NRC       Scenario #     1       Event #         3 and 4     Page 10    of 18 Event
M.O. Cue:  If sent as Radwaste or I&C to investigate CEDMCS, WAIT 5 minutes and REPORT that a tripped breaker was located. REQUEST permission to reclose one time.
RO VERIFY Reactor is critical.
CRS RECORD initial and stabilized reactor power for subsequent SDM calculation.
CRS Within 15 minutes, DIRECT monitoring of DNBR and LPD per SO23-3-3.6, Attachment for DNBR Margin and Linear Heat Rate Limit Monitoring.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 3 and 4 Page 9 of 18 Event


== Description:==
== Description:==
Dropped Control Element Assembly #44 / Downpower Due to Dropped CEA Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc Floor Cue:  The Work Control Supervisor will complete the DNBR and LPD monitoring in accordance with SO23-3-3.6, Attachment 1.
Dropped Control Element Assembly #44 / Downpower Due to Dropped CEA Time         Position                               Applicants Actions or Behavior
CRS DIRECT performance of Attachment 3, Misaligned CEA Checklist.
* COMPARE affected CEA PIDs from CEAC No. 1 and 2 at Secondary Rod Position CRT.
Floor Cue:  The Work Control Supervisor will also complete SO23-3-3.6, Attachment 3.
* CHECK UEL and LEL lights.
CRS Within 15 minutes of discovery, DIRECT initiation of Reactor power reduction.
VERIFY one CEA has not been misaligned >7 inches for an unknown RO/CRS duration.
For Non Group 6 Full Length CEA, REDUCE power 10% within 60 minutes. Examiner Note:  CRS should recognize that power reduction due to dropped CEA (~3%) satisfies the 15 minute requirement to initiate a power reduction. The remaining power reduction must be accomplished within 60 minutes.
DIRECT performance of SO23-3-2.19, CEDMCS Operation to confirm that CRS the CEA is movable in the Manual Individual Mode.
BOP COMMENCE lowering Turbine Generator load using CVOL while maintaining Tcold per SO23-5-1.7, Power Operations.
RO        WITHDRAW CEA #44 using the Manual Individual Mode per SO23-3-2.19.
CRS DIRECT initiation of boration of the RCS per SO23-3-2.2, Makeup
CRS/RO      REALIGN CEA #44 to the group per SO23-3-2.19, CEDMCS Operation.
+20 min          CRS       EVALUATE Technical Specifications.
* LCO 3.1.5.A, Control Element Assembly Alignment.
* CONDITION A - One Regulating CEA trippable and misaligned from its group by >7 inches.
* ACTION A.1 - Initiate THERMAL POWER reduction in accordance with COLR requirements within 15 minutes.
* ACTION A.2 - Restore the misaligned CEA(s) to within 7 inches of its group within two (2) hours.
Examiner Note:            Event 5 can be performed at any time during CEA #44 recovery.
When a 3-5% power reduction is completed, or at Lead Evaluators discretion, PROCEED to Event 5.
SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc


Operations to achieve target power level.
Appendix D                                         Operator Action                             Form ES-D-2 Operating Test :       NRC       Scenario #     1       Event #             5        Page 11    of 18 Event
RO COMMENCE attempting to control ASI near full power ESI.
Floor Cue:  If required, DIRECT CRS as the Shift Manager to commence the downpower.
CRS REQUEST Reactor Engineering to report to the Control Room.
CRS INITIATE recovery of affected CEA per Attachment 1.
RO VERIFY CEA position indications agree:
COMPARE affected CEA PIDs from CEAC No. 1 and 2 at CPC Operator Console.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 3 and 4 Page 10 of 18 Event


== Description:==
== Description:==
Dropped Control Element Assembly #44 / Downpower Due to Dropped CEA Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc COMPARE affected CEA PIDs from CEAC No. 1 and 2 at Secondary Rod Position CRT.
Dropped Control Element Assembly #3 / Manual Reactor Trip Required Time         Position                               Applicants Actions or Behavior Machine Operator:          When directed, EXECUTE Event 5.
CHECK UEL and LEL lights.
                            - RD0303, Dropped CEA #3.
RO/CRS VERIFY one CEA has not been misaligned >7 inches for an unknown duration.
Indications Available:
CRS DIRECT performance of SO23-3-2.19, CEDMCS Operation to confirm that
50A28 - CEA DEVIATION 50A38 - CEA GROUP DEVIATION 50A10 - CEDMCS CEA WITHDRAWAL PROHIBIT CEA #3 Rod Bottom indication
 
+10 secs        RO         RECOGNIZE 2nd dropped CEA #3 and manually INITIATE a Reactor trip.
the CEA is movable in the Manual Individual Mode.
Within five (5) minutes of a second CEA dropping into the Core, trip the CRITICAL TASK            Reactor.
RO WITHDRAW CEA #44 using the Manual Individual Mode per SO23-3-2.19.
STATEMENT Elapsed Time: __________
CRS/RO REALIGN CEA #44 to the group per SO23-3-2.19, CEDMCS Operation.  
CRITICAL TASK RO/BOP      MANUALLY TRIP the Reactor.
+20 min CRS EVALUATE Technical Specifications.
+1 min            CRS        DIRECT performance of SO23-12-1, Standard Post Trip Actions.
LCO 3.1.5.A, Control Element Assembly Alignment.
When the Reactor is tripped, or at Lead Evaluators discretion, PROCEED to Events 6, 7, and 8.
CONDITION A - One Regulating CEA trippable and misaligned from its group by >7 inches. ACTION A.1 - Initiate THERMAL POWER reduction in accordance with COLR requirements within 15 minutes. ACTION A.2 - Restore the misaligned CEA(s) to within 7 inches of its group within two (2) hours.
SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc
Examiner Note:  Event 5 can be performed at any time during CEA #44 recovery.
When a 3-5% power reduction is completed, or at Lead Evaluator's discretion, PROCEED to Event 5.  


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 5 Page 11 of 18 Event
Appendix D                                         Operator Action                                 Form ES-D-2 Operating Test :       NRC       Scenario #     1         Event #       6, 7, & 8      Page 12    of 18 Event


== Description:==
== Description:==
Dropped Control Element Assembly #3 / Manual Reactor Trip Required Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc Machine Operator: When directed, EXECUTE Event 5. - RD0303, Dropped CEA #3.
Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time         Position                               Applicants Actions or Behavior Machine Operator:         When directed, EXECUTE Events 6, 7, and 8.
Indications Available
                          - RC01A, Large Break LOCA.
: 50A28 - CEA DEVIATION 50A38 - CEA GROUP DEVIATION 50A10 - CEDMCS CEA WITHDRAWAL PROHIBIT CEA #3 Rod Bottom indication
                          - Bus 2A07 LP, Bus 2A07 Transfer Failure.
+10 secs RO RECOGNIZE 2 nd dropped CEA #3 and manually INITIATE a Reactor trip.
                          - RP01E, LPSI Pump P016 fails to auto start.
CRITICAL TASK STATEMENT Within five (5) minutes of a second CEA dropping into the Core, trip the Reactor. Elapsed Time: __________
Indications available:
CRITICAL TASK RO/BOP MANUALLY TRIP the Reactor.
Numerous Reactor and Turbine trip related alarms CRS       DIRECT performance of SO23-12-1, Standard Post Trip Actions.
+1 min CRS DIRECT performance of SO23-12-1, Standard Post Trip Actions.
RO        VERIFY Reactor Trip:
When the Reactor is tripped, or at Lead Evaluator's discretion, PROCEED to Events 6, 7, and 8.
* VERIFY Reactor Trip Circuit Breakers (8) open.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 6, 7, & 8 Page 12 of 18 Event
* VERIFY Reactor Power lowering and Startup Rate negative.
* VERIFY maximum of one full length CEA NOT fully inserted.
CRS        VERIFY Reactivity Control criteria satisfied.
BOP        VERIFY Turbine Trip:
* VERIFY Main Turbine tripped.
* HP and LP Stop and Governor Valves closed.
* VERIFY both Unit Output Breakers open.
* VERIFY Main Turbine speed < 2000 RPM or lowering.
CRS        INITIATE Administrative Actions:
* ANNOUNCE Reactor trip via PA System.
* INITIATE Attachment 4, Worksheet.
* INITIATE Attachment 5, Administrative Actions.
BOP        VERIFY Vital Auxiliaries criteria satisfied:
* VERIFY both 1E 4 kV Buses A04 and A06 energized.
* VERIFY both 1E 480 V Buses B04 and B06 energized.
* VERIFY all 1E DC Buses energized.
SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc


== Description:==
Appendix D                                         Operator Action                               Form ES-D-2 Operating Test :       NRC       Scenario #     1       Event #       6, 7, & 8       Page 13   of 18 Event
Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc Machine Operator: When directed, EXECUTE Events 6, 7, and 8.  - RC01A, Large Break LOCA.  - Bus 2A07 LP, Bus 2A07 Transfer Failure.
- RP01E, LPSI Pump P016 fails to auto start.
Indications available
: Numerous Reactor and Turbine trip related alarms CRS DIRECT performance of SO23-12-1, Standard Post Trip Actions.
RO VERIFY Reactor Trip:
VERIFY Reactor Trip Circuit Breakers (8) open.
VERIFY Reactor Power lowering and Startup Rate negative.
VERIFY maximum of one full length CEA NOT fully inserted.
CRS VERIFY Reactivity Control criteria satisfied.
BOP VERIFY Turbine Trip:
VERIFY Main Turbine tripped.
HP and LP Stop and Governor Valves closed.
VERIFY both Unit Output Breakers open.
VERIFY Main Turbine speed < 2000 RPM or lowering.
CRS INITIATE Administrative Actions:
ANNOUNCE Reactor trip via PA System.
INITIATE Attachment 4, Worksheet.
INITIATE Attachment 5, Administrative Actions.
BOP VERIFY Vital Auxiliaries criteria satisfied:
VERIFY both 1E 4 kV Buses A04 and A06 energized.
VERIFY both 1E 480 V Buses B04 and B06 energized.
VERIFY all 1E DC Buses energized.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 6, 7, & 8 Page 13 of 18 Event


== Description:==
== Description:==
Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc BOP DETERMINE one Non-1E 4 kV Bus deenergized.
Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time         Position                               Applicants Actions or Behavior BOP
[RNO] TRANSFER Non-1E 4 kV Bus 2A07 to Reserve Auxiliary Transformer.
* DETERMINE one Non-1E 4 kV Bus deenergized.
BOP  VERIFY both CCW Trains operating and NOT aligned to Non-Critical Loop and Letdown Heat Exchanger.
                                *  [RNO] TRANSFER Non-1E 4 kV Bus 2A07 to Reserve Auxiliary Transformer.
[RNO] If CIAS actuated, ENSURE all RCPs stopped.
* VERIFY both CCW Trains operating and NOT aligned to Non-Critical BOP Loop and Letdown Heat Exchanger.
CRITICAL TASK STATEMENT Within 10 minutes of a loss of CCW or low subcooling alarm annunciation, the affected RCP(s) will be stopped. Elapsed Time: __________
                                *  [RNO] If CIAS actuated, ENSURE all RCPs stopped.
CRITICAL TASK BOP STOP all RCPs due to CIAS.
Within 10 minutes of a loss of CCW or low subcooling alarm annunciation, the CRITICAL TASK          affected RCP(s) will be stopped.
RO DETERMINE RCS Inventory Control criteria NOT satisfied:
STATEMENT Elapsed Time: __________
DETERMINE PZR level NOT between 10% and 70% AND NOT trending to between 30% and 60%.
CRITICAL TASK BOP       STOP all RCPs due to CIAS.
DETERMINE Core Exit Saturation Margin < 20&deg;F:
RO       DETERMINE RCS Inventory Control criteria NOT satisfied:
QSPDS page 611.
* DETERMINE PZR level NOT between 10% and 70% AND NOT trending to between 30% and 60%.
CFMS page 311.
* DETERMINE Core Exit Saturation Margin < 20&deg;F:
CRITICAL TASK STATEMENT Within 15 minutes of SFSC Inventory Control completion following RCS pressure falling below 1400 psia, the crew establishes the required SI flow. Elapsed Time: __________
* QSPDS page 611.
CRITICAL TASK RO ESTABLISH minimum design Safety Injection flowrate; START LPSI Pump P016. RO DETERMINE RCS Pressure Control criteria NOT satisfied:
* CFMS page 311.
DETERMINE PZR pressure (WR and NR) NOT between 1740 PSIA and 2380 PSIA AND NOT trending to between 2025 PSIA and 2275 PSIA.
Within 15 minutes of SFSC Inventory Control completion following RCS CRITICAL TASK          pressure falling below 1400 psia, the crew establishes the required SI flow.
[RNO] DETERMINE PZR Pressure Control System is NOT restoring PZR pressure.
STATEMENT Elapsed Time: __________
[RNO] ENSURE Normal and Aux Spray valves closed.
CRITICAL                   ESTABLISH minimum design Safety Injection flowrate; START LPSI Pump TASK            RO P016.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 6, 7, & 8 Page 14 of 18 Event
RO       DETERMINE RCS Pressure Control criteria NOT satisfied:
* DETERMINE PZR pressure (WR and NR) NOT between 1740 PSIA and 2380 PSIA AND NOT trending to between 2025 PSIA and 2275 PSIA.
                                *  [RNO] DETERMINE PZR Pressure Control System is NOT restoring PZR pressure.
                                *  [RNO] ENSURE Normal and Aux Spray valves closed.
SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc


== Description:==
Appendix D                                         Operator Action                               Form ES-D-2 Operating Test :       NRC       Scenario #       1       Event #       6, 7, & 8       Page 14    of 18 Event
Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc
[RNO] If PZR pressure (WR) is less than 1740 psia, ENSURE SIAS/CCAS/CRIS actuated.
[RNO] If PZR pressure (WR) is less than 1430 psia, ENSURE one RCP and each loop stopped.
[RNO] If RCP NPSH requirements of Attachment 3 NOT satisfied, THEN ENSURE all RCPs stopped.
RO DETERMINE Core Heat Removal criteria is NOT satisfied:
DETERMINE no RCPs operating.
DETERMINE Core Exit Saturation Margin < 20&deg;F.
QSPDS page 611.
CFMS page 311.
BOP DETERMINE RCS Heat Removal criteria NOT satisfied:
VERIFY at least one SGs level between 21% and 80% NR AND Feedwater available.
[RNO] ENSURE EFAS actuated.
DETERMINE T cold < 545&deg;F and NOT controlled.
[RNO] ENSURE SBCS valves closed.
[RNO] ENSURE ADVs closed.
[RNO] ENSURE SG Blowdown valves closed.
E-088 - HV-4054 E-089 - HV-4053
[RNO] ENSURE Main Steam to Reheater Valves closed.
HV-2703 or HV-2704; HV-2721; HV-2751 VERIFY SG pressures > 740 PSIA.
BOP DETERMINE  MSIVs closed due to CIAS.
RO DETERMINE Containment Isolation criteria NOT satisfied:
DETERMINE Containment pressure > 1.5 PSIG.
[RNO] DETERMINE Containment pressure > 3.4 PSIG.
[RNO] ENSURE SIAS, CIAS, CCAS, and CRIS actuated.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 6, 7, & 8 Page 15 of 18 Event


== Description:==
== Description:==
Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc RO/BOP  DETERMINE Containment Area Radiation Monitors energized AND alarming or trending to alarm.
Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time         Position                               Applicants Actions or Behavior
VERIFY Secondary Plant Radiation Monitors energized AND NOT alarming or trending to alarm.
                                *  [RNO] If PZR pressure (WR) is less than 1740 psia, ENSURE SIAS/CCAS/CRIS actuated.
RO DETERMINE Containment Temperature and Pressure criteria NOT satisfied:
                                *  [RNO] If PZR pressure (WR) is less than 1430 psia, ENSURE one RCP and each loop stopped.
DETERMINE Containment average temperature > 120&deg;F.
                                *  [RNO] If RCP NPSH requirements of Attachment 3 NOT satisfied, THEN ENSURE all RCPs stopped.
DETERMINE Containment pressure > 1.5 PSIG.
RO       DETERMINE Core Heat Removal criteria is NOT satisfied:
[RNO] ENSURE proper functioning of the Normal Containment Cooling.    [RNO] ENSURE at least one Containment Dome Air Circulator operating.
* DETERMINE no RCPs operating.
[RNO] DETERMINE Containment pressure > 3.4 PSIG.
* DETERMINE Core Exit Saturation Margin < 20&deg;F.
[RNO] ENSURE all RCPs stopped.
* QSPDS page 611.
[RNO] ENSURE all available Containment Emergency Cooling Units operating.
* CFMS page 311.
DETERMINE Containment pressure > 14 PSIG.
BOP      DETERMINE RCS Heat Removal criteria NOT satisfied:
[RNO] ENSURE CSAS actuated.
* VERIFY at least one SGs level between 21% and 80% NR AND Feedwater available.
[RNO] ENSURE all available Containment Spray Header flows greater than 1600 gpm.  
                                *    [RNO] ENSURE EFAS actuated.
+15 min CRS DIAGNOSE Event in Progress:
* DETERMINE Tcold < 545&deg;F and NOT controlled.
DETERMINE most Safety Function criteria are NOT met per Attachment 4, Worksheet.
                                *    [RNO] ENSURE SBCS valves closed.
[RNO] COMPLETE Attachment 1, Recovery Diagnostics.
                                *    [RNO] ENSURE ADVs closed.
[RNO] DIAGNOSE Loss of Coolant Accident.
                                *    [RNO] ENSURE SG Blowdown valves closed.
DETERMINE that Reactor Trip Recovery is NOT diagnosed.
* E-088 - HV-4054          E-089 - HV-4053
[RNO] DETERMINE all RCPs stopped.
                                *    [RNO] ENSURE Main Steam to Reheater Valves closed.
DIRECT initiating Steps 12 through 15.
* HV-2703 or HV-2704; HV-2721; HV-2751
BOP INITIATE Steps 12 through 15.
* VERIFY SG pressures > 740 PSIA.
CRS DIRECT performance of SO23-12-3, LOCA.
BOP      DETERMINE MSIVs closed due to CIAS.
RECORD time of EOI entry __________.
RO        DETERMINE Containment Isolation criteria NOT satisfied:
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 6, 7, & 8 Page 16 of 18 Event
* DETERMINE Containment pressure > 1.5 PSIG.
                                *  [RNO] DETERMINE Containment pressure > 3.4 PSIG.
                                *  [RNO] ENSURE SIAS, CIAS, CCAS, and CRIS actuated.
SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc


== Description:==
Appendix D                                         Operator Action                               Form ES-D-2 Operating Test :       NRC       Scenario #       1       Event #         6, 7, & 8     Page 15    of 18 Event
Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc
+15 min CRS VERIFY LOCA diagnosis:
INITIATE SO23-12-10, Safety Function Status Checks.
INITIATE Foldout Page.
DIRECT performance of FS-7, Verify SI Throttle/Stop Criteria.
DIRECT performance of FS-3, Monitor Natural Circulation.
DIRECT performance of Attachment 22, Non-Qualified Loads Restoration.
VERIFY LOCA diagnosis using Figure 1, Break Identification Chart.
INITIATE sampling of both Steam Generators for radioactivity and boron.
M.O. Cue:  If directed to sample SGs, WAIT 5 minutes and then REPORT that E088 and E089 both have activity near background, and normal boron levels. If the SG sample valves are closed, REPORT unable to establish sample flow.
CRS INITIATE Administrative actions:
NOTIFY Shift Manager/Operations Leader of SO23-12-3, Loss of Coolant Accident initiation.
ENSURE Emergency Plan is initiated.
IMPLEMENT Placekeeper.
RO VERIFY ESF actuation.
ENSURE the following actuated:
SIAS / CCAS / CRIS CRS RECORD time of SIAS.
BOP STOP unloaded Train B Diesel Generator (SIAS Override STOP).
BOP INITIATE SO23-12-11, Attachment 22, Non-Qualified Load Restoration.
M.O. Cue: When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored Non-Qualified Loads.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 6, 7, & 8 Page 17 of 18 Event


== Description:==
== Description:==
Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc RO ESTABLISH Optimum SI Alignment:
Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time         Position                               Applicants Actions or Behavior
ESTABLISH two train operation.
* DETERMINE Containment Area Radiation Monitors energized AND RO/BOP alarming or trending to alarm.
All Charging Pumps operating.
* VERIFY Secondary Plant Radiation Monitors energized AND NOT alarming or trending to alarm.
One Train B HPSI and one Train B LPSI operating.
RO       DETERMINE Containment Temperature and Pressure criteria NOT satisfied:
One Train A HPSI operating.
* DETERMINE Containment average temperature > 120&deg;F.
All Cold leg flow paths aligned.
* DETERMINE Containment pressure > 1.5 PSIG.
VERIFY SI flow required:
                                *  [RNO] ENSURE proper functioning of the Normal Containment Cooling.
SI flow indicated.
                                *  [RNO] ENSURE at least one Containment Dome Air Circulator operating.
RO VERIFY PZR pressure:
                                *  [RNO] DETERMINE Containment pressure > 3.4 PSIG.
DETERMINE RCP NPSH requirements of SO23-12-11, Attachment 29 NOT satisfied.
                                *  [RNO] ENSURE all RCPs stopped.
[RNO] VERIFY all RCPs stopped.
                                *  [RNO] ENSURE all available Containment Emergency Cooling Units operating.
[RNO] INITIATE FS-3, Monitor Natural Circulation.
* DETERMINE Containment pressure > 14 PSIG.
RO VERIFY Letdown isolated.
                                *  [RNO] ENSURE CSAS actuated.
RO VERIFY outside Containment radiation alarms - NOT alarming or trending to alarm. RO VERIFY outside Containment sump levels - NOT abnormally rising.
                                *  [RNO] ENSURE all available Containment Spray Header flows greater than 1600 gpm.
RO VERIFY RCS sample valves, RCS and PZR head vents are closed.
+15 min          CRS      DIAGNOSE Event in Progress:
RO VERIFY CCW parameters are normal.
* DETERMINE most Safety Function criteria are NOT met per Attachment 4, Worksheet.
CRS/RO VERIFY PZR Safety Valves are closed.  
                                *  [RNO] COMPLETE Attachment 1, Recovery Diagnostics.
                                *  [RNO] DIAGNOSE Loss of Coolant Accident.
* DETERMINE that Reactor Trip Recovery is NOT diagnosed.
                                *  [RNO] DETERMINE all RCPs stopped.
* DIRECT initiating Steps 12 through 15.
BOP      INITIATE Steps 12 through 15.
CRS      DIRECT performance of SO23-12-3, LOCA.
* RECORD time of EOI entry __________.
SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 6, 7, & 8 Page 18 of 18 Event
Appendix D                                           Operator Action                               Form ES-D-2 Operating Test :       NRC         Scenario #     1       Event #       6, 7, & 8       Page 16    of 18 Event


== Description:==
== Description:==
Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc CRS/RO DETERMINE rate of RCS inventory and pressure loss greater than available Charging Pump capacity.  
Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time         Position                               Applicants Actions or Behavior
+30 min CRS DIRECT initiation of RCS cooldown.
+15 min            CRS      VERIFY LOCA diagnosis:
When the RCS cooldown is initiated, or at Lead Evaluator's discretion, TERMINATE the  
* INITIATE SO23-12-10, Safety Function Status Checks.
* INITIATE Foldout Page.
* DIRECT performance of FS-7, Verify SI Throttle/Stop Criteria.
* DIRECT performance of FS-3, Monitor Natural Circulation.
* DIRECT performance of Attachment 22, Non-Qualified Loads Restoration.
* VERIFY LOCA diagnosis using Figure 1, Break Identification Chart.
* INITIATE sampling of both Steam Generators for radioactivity and boron.
M.O. Cue:        If directed to sample SGs, WAIT 5 minutes and then REPORT that E088 and E089 both have activity near background, and normal boron levels. If the SG sample valves are closed, REPORT unable to establish sample flow.
CRS       INITIATE Administrative actions:
* NOTIFY Shift Manager/Operations Leader of SO23-12-3, Loss of Coolant Accident initiation.
* ENSURE Emergency Plan is initiated.
* IMPLEMENT Placekeeper.
RO       VERIFY ESF actuation.
* ENSURE the following actuated:
* SIAS / CCAS / CRIS CRS       RECORD time of SIAS.
BOP      STOP unloaded Train B Diesel Generator (SIAS Override STOP).
BOP      INITIATE SO23-12-11, Attachment 22, Non-Qualified Load Restoration.
M.O. Cue:        When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored Non-Qualified Loads.
SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc


scenario.
Appendix D                                          Operator Action                                Form ES-D-2 Operating Test :        NRC        Scenario #      1      Event #        6, 7, & 8      Page 17    of  18 Event


Appendix D Scenario Outline Form ES-D-1 SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc Facility: SONGS 2 and 3 Scenario No.: 2 Op Test No.: October 2009 NRC Examiners:  Operators:
== Description:==
Initial Conditions:  74% power BOC - RCS Boron is 1687 ppm (by sample). Train A Component Cooling Water Pump (P-025) in service. Train A Low Pressure Safety Injection Pump (P-015) OOS for oil change. Train A Emergency Diesel Generator (G-002) OOS for governor repair. Condensate Pump (P-050) OOS for coupling alignment. Fire Computer is OOS. Turnover: Maintain steady-state power conditions.
Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time          Position                              Applicants Actions or Behavior RO        ESTABLISH Optimum SI Alignment:
Critical Tasks: Restore Component Cooling Water flow to the Non-Critical Loop. Restore power to at least one 1E 4 kV Bus (Station Blackout)
* ESTABLISH two train operation.
. Restore Feedwater flow to at least one Steam Generator (Loss of Feedwater). Event No. Malf. No. Event Type* Event Description 1 +10 min ED11 TS (CRS) Loss of Control Room Annunciators.
* All Charging Pumps operating.
2 +15 min FW08B C (BOP, CRS)
* One Train B HPSI and one Train B LPSI operating.
Main Feedwater Pump Turbine (P-063) loss of oil pressure.
* One Train A HPSI operating.
3 +35 min  R (RO)
* All Cold leg flow paths aligned.
N (BOP, CRS) Rapid Power Reduction to 70% for loss of one Main Feed Pump.
* VERIFY SI flow required:
4 +50 min ED03A C (RO, BOP, CRS)
* SI flow indicated.
TS (CRS) Loss of 1E 4160 Volt Bus 2A04.
RO        VERIFY PZR pressure:
5 +50  min TU08 PG24 M (RO, BOP, CRS)
* DETERMINE RCP NPSH requirements of SO23-12-11, Attachment 29 NOT satisfied.
                                *  [RNO] VERIFY all RCPs stopped.
                                *   [RNO] INITIATE FS-3, Monitor Natural Circulation.
RO        VERIFY Letdown isolated.
VERIFY outside Containment radiation alarms - NOT alarming or trending to RO alarm.
RO       VERIFY outside Containment sump levels - NOT abnormally rising.
RO        VERIFY RCS sample valves, RCS and PZR head vents are closed.
RO       VERIFY CCW parameters are normal.
CRS/RO      VERIFY PZR Safety Valves are closed.
SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc


Loss of Offsite Power.
Appendix D                                        Operator Action                                Form ES-D-2 Operating Test :        NRC      Scenario #      1        Event #        6, 7, & 8      Page 18    of 18 Event


6 +50 min EG08B M (RO, BOP, CRS)
== Description:==
Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time          Position                              Applicants Actions or Behavior DETERMINE rate of RCS inventory and pressure loss greater than available CRS/RO Charging Pump capacity.
+30 min           CRS      DIRECT initiation of RCS cooldown.
When the RCS cooldown is initiated, or at Lead Evaluators discretion, TERMINATE the scenario.
SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc


Emergency Diesel Generator (G-003) fails to start.  
Appendix D                                    Scenario Outline                            Form ES-D-1 Facility:        SONGS 2 and 3                Scenario No.:        2    Op Test No.:    October 2009 NRC Examiners:                                                Operators:
Initial Conditions:
* 74% power BOC - RCS Boron is 1687 ppm (by sample).
* Train A Component Cooling Water Pump (P-025) in service.
* Train A Low Pressure Safety Injection Pump (P-015) OOS for oil change.
* Train A Emergency Diesel Generator (G-002) OOS for governor repair.
* Condensate Pump (P-050) OOS for coupling alignment.
* Fire Computer is OOS.
Turnover:              Maintain steady-state power conditions.
Critical Tasks:
* Restore Component Cooling Water flow to the Non-Critical Loop.
* Restore power to at least one 1E 4 kV Bus (Station Blackout).
* Restore Feedwater flow to at least one Steam Generator (Loss of Feedwater).
Event No.      Malf. No.      Event Type*                                Event Description 1      ED11        TS (CRS)              Loss of Control Room Annunciators.
+10 min 2      FW08B      C (BOP, CRS)          Main Feedwater Pump Turbine (P-063) loss of oil pressure.
+15 min 3                  R (RO)                Rapid Power Reduction to 70% for loss of one Main Feed Pump.
+35 min                  N (BOP, CRS) 4      ED03A      C (RO, BOP, CRS) Loss of 1E 4160 Volt Bus 2A04.
+50 min                  TS (CRS) 5      TU08        M (RO, BOP, CRS) Loss of Offsite Power.
+50 min      PG24 6      EG08B      M (RO, BOP, CRS) Emergency Diesel Generator (G-003) fails to start.
+50 min                                        Station Blackout.
7      FW25        C (BOP)              Turbine Driven Auxiliary Feedwater Pump (P-140) trips on
+55 min                                        overspeed (300 seconds post-trip). Loss of Feedwater.
8      CVCS LP    I (RO)                Boric Acid Makeup Tank Gravity Feed Valves fail to open during
  + min                                        boration.
    *    (N)ormal,  (R)eactivity,  (I)nstrument,  (C)omponent,    (M)ajor, (TS)Technical Specifications SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc


Station Blackout.
Appendix D                                 Scenario Outline                         Form ES-D-1 SCENARIO  
7 +55 min FW25 C (BOP) Turbine Driven Auxiliary Feedwater Pump (P-140) trips on overspeed (300 seconds post-trip). Loss of Feedwater.
8 +  min CVCS LP I (RO)
Boric Acid Makeup Tank Gravity Feed Valves fail to open during boration. * (N)ormal,    (R)eactivity,    (I)nstrument,    (C)omponent,    (M)ajor,  (TS)Technical Specifications
 
Appendix D Scenario Outline Form ES-D-1 SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc SCENARIO  


==SUMMARY==
==SUMMARY==
NRC #2 The crew will assume the watch and maintain steady-state conditions per Operating Instruction (OI)
NRC #2 The crew will assume the watch and maintain steady-state conditions per Operating Instruction (OI)
SO23-5-1.7, Power Operations.  
SO23-5-1.7, Power Operations.
 
The first event is a Loss of Control Room Annunciators. The crew will respond per Abnormal Operating Instruction (AOI) SO23-13-22, Loss of Control Room Annunciators. Actions include aligning an alternate power supply to the Control Room Annunciators. The CRS will evaluate Technical Specifications.
The first event is a Loss of Control Room Annunciators. The crew will respond per Abnormal Operating Instruction (AOI) SO23-13-22, Loss of Control Room Annunciators. Actions include aligning an alternate power supply to the Control Room Annunciators. The CRS will evaluate Technical Specifications.  
 
When the annunciators are restored, a loss of oil pressure to Main Feedwater Pump P-063 will occur.
When the annunciators are restored, a loss of oil pressure to Main Feedwater Pump P-063 will occur.
The crew will respond per the Annunciator Response Procedures (ARP) and AOI SO23-13-24, Feedwater Control System Malfunction and determine that a Main Feedwater Pump trip is warranted. This will necessitate entry into AOI SO23-13-28, Rapid Power Reduction in order to low power below the threshold for one (1) Main Feedwater Pump operation.  
The crew will respond per the Annunciator Response Procedures (ARP) and AOI SO23-13-24, Feedwater Control System Malfunction and determine that a Main Feedwater Pump trip is warranted.
 
This will necessitate entry into AOI SO23-13-28, Rapid Power Reduction in order to low power below the threshold for one (1) Main Feedwater Pump operation.
When plant conditions are stable, a loss of 1E 4160 Volt Bus 2A04 will occur. The crew will enter him the AOI SO23-13-26, Loss of Power to an AC Bus. Crew actions include placing a Charging Pump in service as well as transferring to the Train B Component Cooling Water System. The CRS will evaluate Technical Specifications.  
When plant conditions are stable, a loss of 1E 4160 Volt Bus 2A04 will occur. The crew will enter him the AOI SO23-13-26, Loss of Power to an AC Bus. Crew actions include placing a Charging Pump in service as well as transferring to the Train B Component Cooling Water System. The CRS will evaluate Technical Specifications.
 
The major event is a Loss of Offsite Power that requires entry into Emergency Operating Instruction (EOI) SO23-12-1, Standard Post Trip Actions. During performance of the Standard Post Trip Actions, the Train B Emergency Diesel Generator fails to start. Additionally, five (5) minutes post-trip the Turbine Driven Auxiliary Feedwater Pump will trip on overspeed. With a Station Blackout and Loss of Feedwater, the CRS will be required to enter Functional Recovery Procedure (FRP) SO23-12-9, Functional Recovery. Boric Acid Makeup Tank Gravity Feed Valves fail to open during boration and the Reactor Operator will be required to manually align the Refueling Water Storage Tank.
The major event is a Loss of Offsite Power that requires entry into Emergency Operating Instruction (EOI) SO23-12-1, Standard Post Trip Actions. During performance of the Standard Post Trip Actions, the Train B Emergency Diesel Generator fails to start. Additionally, five (5) minutes post-trip the Turbine Driven Auxiliary Feedwater Pump will trip on overspeed. With a Station Blackout and Loss of Feedwater, the CRS will be required to enter Functional Recovery Procedure (FRP) SO23-12-9, Functional Recovery. Boric Acid Makeup Tank Gravity Feed Valves fail to open during boration and the Reactor Operator will be required to manually align the Refueling Water Storage Tank.
With Switchyard power unavailable, restoration of Unit 2 1E 4160 Volt Bus 2A06 will be via a crosstie with Unit 3 1E 4160 Volt Bus 3A06. Once the crosstie is successful, Auxiliary Feedwater Pump P-504 can be started to restore feedwater flow to Steam Generator E-088.
With Switchyard power unavailable, restoration of Unit 2 1E 4160 Volt Bus 2A06 will be via a crosstie with Unit 3 1E 4160 Volt Bus 3A06. Once the crosstie is successful, Auxiliary Feedwater Pump P-504 can be started to restore feedwater flow to Steam Generator E-088.
 
The scenario is terminated when the 1E Bus is reenergized, feedwater flow is restored, and boration via the RWST is commenced.
The scenario is terminated when the 1E Bus is reenergized, feedwater flow is restored, and boration via the RWST is commenced.  
 
Risk Significance:
Risk Significance:
Risk important components out of service: LPSI Pump (P-015)  
* Risk important components out of service:           LPSI Pump (P-015)
 
Emergency Diesel Generator (G-002)
Emergency Diesel Generator (G-002)
Failure of risk important system prior to trip: Loss of 4160 V Bus 2A04 Risk significant core damage sequence: Station Blackout with Loss of Feedwater Risk significant operator actions:   Restore Flow to Non-Critical Loop Crosstie Bus 3A06 with Bus 2A06 Align Feedwater Flow to a Steam Generator
* Failure of risk important system prior to trip:     Loss of 4160 V Bus 2A04
* Risk significant core damage sequence:             Station Blackout with Loss of Feedwater
* Risk significant operator actions:                 Restore Flow to Non-Critical Loop Crosstie Bus 3A06 with Bus 2A06 Align Feedwater Flow to a Steam Generator SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc


Scenario Event Description NRC Scenario #2 SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc SONGS 2009 Facility NRC Initial License Examination Simulator Scenario Setup Machine Operator: EXECUTE IC #222 and NRC Scenario #2 SETUP file to align components. HANG Control Board Tags on P-015, P-050 and G-002. CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario born concentration. RESET CVCS Batch Counters to zero (0). VERIFY both Pressurizer Spray Valves in AUTO. PLACE Channel X Pressurizer Pressure and Pressurizer Level in service.
Scenario Event Description NRC Scenario #2 SONGS 2009 Facility NRC Initial License Examination Simulator Scenario Setup Machine Operator:   EXECUTE IC #222 and NRC Scenario #2 SETUP file to align components.
PLACE procedures in progress on the RO desk:  
HANG Control Board Tags on P-015, P-050 and G-002.
- Copy of SO23-5-1.7, Power Operations open to Section 6.1, Guidelines for Steady State Operation. PLACE the BOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board. If Group Position(s) is (are) not correct, MOVE CEAs and then RETURN CEAs to Shift Turnover Sheet position (Group 6 @ 137 / PLCEAs @ 115).
CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario born concentration.
Control Room Annunciators in Alarm
RESET CVCS Batch Counters to zero (0).
: 57A51 - SI / ECW TRAIN A INOPERABLE 57A55 - STANDBY POWER SYS TRAIN A INOPERABLE 63B07 - DIESEL GEN 2G002 LOCKOUT RELAY TRIPPED  
VERIFY both Pressurizer Spray Valves in AUTO.
PLACE Channel X Pressurizer Pressure and Pressurizer Level in service.
PLACE procedures in progress on the RO desk:
                    - Copy of SO23-5-1.7, Power Operations open to Section 6.1, Guidelines for Steady State Operation.
PLACE the BOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board.
If Group Position(s) is (are) not correct, MOVE CEAs and then RETURN CEAs to Shift Turnover Sheet position (Group 6 @ 137 / PLCEAs @ 115).
Control Room Annunciators in Alarm:
57A51 - SI / ECW TRAIN A INOPERABLE 57A55 - STANDBY POWER SYS TRAIN A INOPERABLE 63B07 - DIESEL GEN 2G002 LOCKOUT RELAY TRIPPED SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 1 Page 4 of 22 Event
Appendix D                                           Operator Action                           Form ES-D-2 Operating Test :       NRC         Scenario #     2     Event #             1       Page 4   of 22 Event


== Description:==
== Description:==
Loss of Control Room Annunciators Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc Machine Operator: When directed, EXECUTE Event 1. - ED11, Loss of Control Room Annunciators.
Loss of Control Room Annunciators Time         Position                               Applicants Actions or Behavior Machine Operator:         When directed, EXECUTE Event 1.
Indications Available
                          - ED11, Loss of Control Room Annunciators.
: UA20050C - ANNUNCIATOR SYSTEM LOSS OF POWER  
Indications Available:
+30 secs RO REFER to Annunciator Response Procedures.
UA20050C - ANNUNCIATOR SYSTEM LOSS OF POWER
RO RECOGNIZE Annunciator System Loss of Power alarm and INFORM CRS ARP SO23-15-50.A2, Annunciator UA20050C entry required.
+30 secs         RO         REFER to Annunciator Response Procedures.
CRS DIRECT performance of ARP SO23-15-50.A2, UA20050C - ANNUNCIATOR SYSTEM LOSS OF POWER.
RECOGNIZE Annunciator System Loss of Power alarm and INFORM CRS RO ARP SO23-15-50.A2, Annunciator UA20050C entry required.
CRS DIRECT testing of all Control Room Annunciator panels.
DIRECT performance of ARP SO23-15-50.A2, UA20050C - ANNUNCIATOR CRS SYSTEM LOSS OF POWER.
CRS DIRECT performance of SO23-13-22, Loss of Control Room Annunciators.
CRS       DIRECT testing of all Control Room Annunciator panels.
CRS/RO DETERMINE loss of all Control Room annunciators has occurred.
CRS       DIRECT performance of SO23-13-22, Loss of Control Room Annunciators.
CRS INITIATE SO23-13-22, Attachment for Guidelines for Monitoring of Plant  
CRS/RO       DETERMINE loss of all Control Room annunciators has occurred.
INITIATE SO23-13-22, Attachment for Guidelines for Monitoring of Plant CRS Parameters.
DETERMINE activities in progress which could potentially disrupt plant CRS stability.
RECOGNIZE that if annunciators are lost for 15 minutes, an Unusual Event CRS must be declared per Tab D1-2.
INITIATE SO23-13-22, Attachment for Power Loss Determination and CRS Recovery.
Examiner Cue:        As long as the Plant Computer System (PCS) is OPERABLE, then Technical Specification LCOs 3.2.1, 3.2.3, 3.2.4, and SR 3.3.7.1 are Not Applicable (N/A).
SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc


Parameters.
Appendix D                                          Operator Action                          Form ES-D-2 Operating Test :        NRC        Scenario #      2      Event #            1        Page 5    of  22 Event
CRS DETERMINE activities in progress which could potentially disrupt plant


stability.
== Description:==
CRS RECOGNIZE that if annunciators are lost for 15 minutes, an Unusual Event must be declared per Tab D1-2.
Loss of Control Room Annunciators Time          Position                              Applicants Actions or Behavior
CRS INITIATE SO23-13-22, Attachment for Power Loss Determination and  
+5 min            CRS      EVALUATE Technical Specifications.
* LCO 3.1.7.E, Regulating CEA Insertion Limits.
* CONDITION E - PDIL Alarm Circuit INOPERABLE.
* ACTION E.1 - Within one (1) hour, PERFORM SO23-3-3.6, Attachment for PDIL Alarm Circuit INOPERABLE.
CRS      REVIEW additional Technical Specifications as time permits.
CRS      VERIFY Bus D5 energized.
DISPATCH an Operator to Panel D5 and VERIFY Breaker 6, Panel D5P4 CRS Supply Breaker, is closed.
M.O. Cue:        If directed to check breaker 2D5-06, WAIT 1 minute then REPORT Breaker 2D5-06 is closed.
DIRECT an Operator to CHECK Panel D5P4 Breaker 74, Panel L-040 supply CRS breaker.
M.O. Cue:        If directed to check Panel 2D5P4 breaker 74, REPORT 2D5P4 Breaker 74 is in a tripped condition, and no visible signs of distress.
DIRECT Electrical Maintenance to assist in troubleshooting and restoration CRS of loss of annunciators.
M.O. Cue:        If Maintenance is directed to investigate Panel 2D5P4, WAIT 1 minute then REPORT no apparent reason for tripped Breaker 74.
Floor Cue:        If operator is directed to inspect Panel 2L-040, REPORT no power indicated (all lights extinguished), and no visible sign of distress.
CRS      DIRECT a PEO to PERFORM a RECLOSE attempt on D5P4 Breaker 74.
SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc


Recovery.
Appendix D                                           Operator Action                           Form ES-D-2 Operating Test :       NRC         Scenario #     2     Event #             1       Page 6    of 22 Event
Examiner Cue:  As long as the Plant Computer System (PCS) is OPERABLE, then Technical Specification LCOs 3.2.1, 3.2.3, 3.2.4, and SR 3.3.7.1 are Not Applicable (N/A).
 
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 1 Page 5 of 22 Event


== Description:==
== Description:==
Loss of Control Room Annunciators Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc
Loss of Control Room Annunciators Time         Position                               Applicants Actions or Behavior M.O. Cue:         If directed to close 2D5P4 Breaker 74, WAIT 1 minute, then DELETE ED11 and REPORT closure to Control Room.
+5 min CRS EVALUATE Technical Specifications.
CRS/RO      RECOGNIZE that annunciator power is restored.
LCO 3.1.7.E, Regulating CEA Insertion Limits.
CRS       DIRECT testing of all Control Room annunciators.
CONDITION E - PDIL Alarm Circuit INOPERABLE. ACTION E.1 - Within one (1) hour, PERFORM SO23-3-3.6, Attachment for PDIL Alarm Circuit INOPERABLE.
+10 min                      TEST all Control Room annunciators and INFORM CRS they are RO/BOP operational.
CRS REVIEW additional Technical Specifications as time permits.
When annunciator power is restored, or at Lead Evaluators discretion, PROCEED to Events 2 and 3.
CRS VERIFY Bus D5 energized.
SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc
CRS DISPATCH an Operator to Panel D5 and VERIFY Breaker 6, Panel D5P4 Supply Breaker, is closed.
M.O. Cue: If directed to check breaker 2D5-06, WAIT 1 minute then REPORT Breaker 2D5-06 is closed.
CRS DIRECT an Operator to CHECK Panel D5P4 Breaker 74, Panel L-040 supply


breaker. M.O. Cue: If directed to check Panel 2D5P4 breaker 74, REPORT 2D5P4 Breaker 74 is in a tripped condition, and no visible signs of distress.
Appendix D                                          Operator Action                            Form ES-D-2 Operating Test :       NRC        Scenario #    2      Event #          2&3        Page 7    of  22 Event
CRS DIRECT Electrical Maintenance to assist in troubleshooting and restoration of loss of annunciators.
M.O. Cue: If Maintenance is directed to investigate Panel 2D5P4, WAIT 1 minute then REPORT no apparent reason for tripped Breaker 74.
Floor Cue:  If operator is directed to inspect Panel 2L-040, REPORT no power indicated (all lights extinguished), and no visible sign of distress.
CRS DIRECT a PEO to PERFORM a RECLOSE attempt on D5P4 Breaker 74.


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 1 Page 6 of 22 Event
== Description:==
Main Feedwater Pump Trip / Rapid Power Reduction Time          Position                              Applicants Actions or Behavior Machine Operator:          When directed, EXECUTE Event 2.
                          - FW08B, Main Feedwater Pump (K005/P063) loss of lube oil.
Indications Available:
53B11 - MFWP TURBINE K005 OIL PRESS LO PRETRIP 53B32 - MFWP TURBINE K005 DC OIL PUMP RUNNING 53B33 - MFWP TURBINE K005 OIL PUMP OOS / OC (after standby pump start) 53B41 - MFWP TURBINE K005 OIL LEVEL HI / LO (~15 seconds later)
+30 secs        BOP        REFER to Annunciator Response Procedures.
RECOGNIZE Main Feedwater Pump loss of lube oil and INFORM the CRS BOP ARP SO23-15-53.B.11 entry required.
DIRECT performance of SO23-15-53.B.11, MFWP TURBINE K005 OIL CRS PRESS LO PRETRIP.
CRS/BOP      DISPATCH a PEO to investigate cause of low lube oil pressure.
M.O.Cue:       After one (1) minute, REPORT an oil line pipe rupture on Main Feedwater Pump P-063.
BOP        VERIFY START of the standby AC Lube Oil Pump.
BOP        VERIFY the DC lube oil pump is running.
DETERMINE Main Feedwater Pump will eventually be tripped due to a loss CRS/BOP of lube oil.
CRS        DIRECT tripping Main Feedwater Pump P063.
TRIP Main Feedwater Pump P063 trip and INFORM the CRS AOI BOP SO23-13-28 entry required.
DIRECT a Rapid Power Reduction using CEAs and/or boration per CRS SO23-13-28, Rapid Power Reduction.
SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc


== Description:==
Appendix D                                         Operator Action                           Form ES-D-2 Operating Test :       NRC       Scenario #     2       Event #           2&3       Page 8    of 22 Event
Loss of Control Room Annunciators Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc M.O. Cue:  If directed to close 2D5P4 Breaker 74, WAIT 1 minute, then DELETE ED11 and REPORT closure to Control Room.
CRS/RO RECOGNIZE that annunciator power is restored.
CRS DIRECT testing of all Control Room annunciators.
+10 min RO/BOP TEST all Control Room annunciators and INFORM CRS they are operational.
When annunciator power is restored, or at Lead Evaluator's discretion, PROCEED to Events 2 and 3.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 2 & 3 Page 7 of 22 Event


== Description:==
== Description:==
Main Feedwater Pump Trip / Rapid Power Reduction Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc Machine Operator: When directed, EXECUTE Event 2. - FW08B, Main Feedwater Pump (K005/P063) loss of lube oil.
Main Feedwater Pump Trip / Rapid Power Reduction Time         Position                               Applicants Actions or Behavior Examiner Note: The following steps are from SO23-13-28, Rapid Power Reduction.
Indications Available
CRS      DIRECT EFAS initiation to restore SG level.
: 53B11 - MFWP TURBINE K005 OIL PRESS LO PRETRIP 53B32 - MFWP TURBINE K005 DC OIL PUMP RUNNING 53B33 - MFWP TURBINE K005 OIL PUMP OOS / OC (after standby pump start) 53B41 - MFWP TURBINE K005 OIL LEVEL HI / LO (~15 seconds later)
+5 min        RO/BOP      INITIATE EFAS by depressing all EFAS Actuation pushbuttons once.
+30 secs BOP REFER to Annunciator Response Procedures.
BORATE as required using the Alternate Boration Flowpath through RO HV-9247.
BOP RECOGNIZE Main Feedwater Pump loss of lube oil and INFORM the CRS
BOP      ENSURE all available Condensate Pumps running.
RO        INSERT CEAs as required.
BOP      INITIATE a Manual Runback for Turbine load change.
BOP      ENSURE Feedwater Control Valves < 100% open and controlling level.
BOP      ENSURE Steam Generator level(s) stable or rising.
BOP      ENSURE Low Level Alarm(s) reset.
DEPRESS all EFAS Actuation Pushbuttons a second time to reset the RO/BOP cycling relays.
CONTACT Chemistry and the GOC and inform them of the Rapid Power CRS Reduction.
IMPLEMENT Attachment 8 to determine the amount of boration and CEAs to RO be used to achieve the target power level.
SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc


ARP SO23-15-53.B.11 entry required.
Appendix D                                         Operator Action                           Form ES-D-2 Operating Test :       NRC       Scenario #       2       Event #           2&3       Page 9    of 22 Event
CRS DIRECT performance of SO23-15-53.B.11, MFWP TURBINE K005 OIL PRESS LO PRETRIP.
CRS/BOP DISPATCH a PEO to investigate cause of low lube oil pressure.
M.O.Cue: After one (1) minute, REPORT an oil line pipe rupture on Main Feedwater Pump P-063. BOP VERIFY START of the standby AC Lube Oil Pump.
BOP VERIFY the DC lube oil pump is running.
CRS/BOP DETERMINE Main Feedwater Pump will eventually be tripped due to a loss
 
of lube oil.
CRS DIRECT tripping Main Feedwater Pump P063.
BOP TRIP Main Feedwater Pump P063 trip and INFORM the CRS AOI SO23-13-28 entry required.
CRS DIRECT a Rapid Power Reduction using CEAs and/or boration per SO23-13-28, Rapid Power Reduction.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 2 & 3 Page 8 of 22 Event


== Description:==
== Description:==
Main Feedwater Pump Trip / Rapid Power Reduction Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc Examiner Note:  The following steps are from SO23-13-28, Rapid Power Reduction.
Main Feedwater Pump Trip / Rapid Power Reduction Time         Position                               Applicants Actions or Behavior
CRS DIRECT EFAS initiation to restore SG level.
  + 20 min         RO       FORCE Pressurizer normal spray flow.
  +5 min RO/BOP INITIATE EFAS by depressing all EFAS Actuation pushbuttons once.
When power level is stable at approximately 70%, or at Lead Evaluators discretion, PROCEED to Event 4.
RO BORATE as required using the Alternate Boration Flowpath through HV-9247. BOP ENSURE all available Condensate Pumps running.
SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc
RO INSERT CEAs as required.
BOP INITIATE a Manual Runback for Turbine load change.
BOP ENSURE Feedwater Control Valves < 100% open and controlling level.
BOP ENSURE Steam Generator level(s) stable or rising.
BOP ENSURE Low Level Alarm(s) reset.
RO/BOP DEPRESS all EFAS Actuation Pushbuttons a second time to reset the cycling relays.
CRS CONTACT Chemistry and the GOC and inform them of the Rapid Power Reduction.
RO IMPLEMENT Attachment 8 to determine the amount of boration and CEAs to be used to achieve the target power level.  


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 2 & 3 Page 9 of 22 Event
Appendix D                                         Operator Action                               Form ES-D-2 Operating Test :       NRC         Scenario #     2       Event #             4        Page 10    of 22 Event


== Description:==
== Description:==
Main Feedwater Pump Trip / Rapid Power Reduction Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc  
Loss of Bus 2A04 Time         Position                                 Applicants Actions or Behavior Machine Operator:          When directed, EXECUTE Event 4.
+ 20 min RO FORCE Pressurizer normal spray flow.
                          - ED03A, Bus 2A04 overcurrent trip and lockout.
When power level is stable at approximately 70%, or at Lead Evaluator's discretion, PROCEED to Event 4.
Indications Available:
63B05 - 2A04 VOLTAGE LO 63B06 - 2B04 VOLTAGE LO 63B25 - 2A04 SUPPLY BREAKER 2A0418 OC
+30 sec        RO/BOP      REFER to Annunciator Response Procedures.
RECOGNIZE low Bus 2A04 voltage and INFORM the CRS AOI SO23-13-26 RO/BOP entry required.
DIRECT performance of AOI SO23-13-26, Loss of Power to an AC Bus, CRS Attachment 1, Loss of 1E 4 kV Bus.
CRS        DIRECT starting of Train B CCW.
BOP        PLACE Train B CCW in service.
CRITICAL TASK            With loss of flow to the CCW Non-Critical Loop and prior to exceeding RCP STATEMENT              operating limits, restore flow to the NCL from any available CCW train.
CRITICAL TASK BOP        TRANSFER the CCW Non-Critical Loop to Train B.
BOP        TRANSFER Letdown Heat Exchanger to Train B CCW.
CRS        DETERMINE that loss of 2A04 is NOT due to fire.
M.O. Cue:        When directed to investigate 2A0418 overcurrent, WAIT 3 minutes and REPORT an overcurrent flag on Phase B.
DIRECT performance of SO23-6-9, 6.9 kV, 4 kV and 480 V Bus Feeder CRS Faults.
SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 4 Page 10 of 22 Event
Appendix D                                         Operator Action                             Form ES-D-2 Operating Test :       NRC       Scenario #     2       Event #             4       Page 11    of 22 Event


== Description:==
== Description:==
Loss of Bus 2A04 Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc Machine Operator:  When directed, EXECUTE Event 4. - ED03A, Bus 2A04 overcurrent trip and lockout.
Loss of Bus 2A04 Time         Position                             Applicants Actions or Behavior DIRECT performance of AOI SO23-13-26, Loss of Power to an AC Bus, CRS Attachment 3, Equipment Actions for Loss of Bus A04.
Indications Available
BOP      ENSURE Train B SWC Pump running.
: 63B05 - 2A04 VOLTAGE LO 63B06 - 2B04 VOLTAGE LO 63B25 - 2A04 SUPPLY BREAKER 2A0418 OC
BOP       VERIFY 2G002 Maintenance Lockout Switch in LOCKOUT.
+30 sec RO/BOP REFER to Annunciator Response Procedures.
Within 1 hour, DIRECT performance of SO23-3-3.23, Attachment for AC CRS Sources Verification for both Units.
RO/BOP RECOGNIZE low Bus 2A04 voltage and INFORM the CRS AOI SO23-13-26 entry required.
PLACE HS-0210, Makeup Mode Selector Switch to MANUAL and PLACE a RO Caution Tag at the switch to prevent inadvertent dilution.
CRS DIRECT performance of AOI SO23-13-26, Loss of Power to an AC Bus, Attachment 1, Loss of 1E 4 kV Bus.
+5 min            CRS      EVALUATE Technical Specifications.
CRS DIRECT starting of Train B CCW.
* LCO 3.8.4.A, DC Sources - Operating.
BOP PLACE Train B CCW in service.
* CONDITION A - One battery or associated control equipment or cabling inoperable.
CRITICAL TASK STATEMENT With loss of flow to the CCW Non-Critical Loop and prior to exceeding RCP operating limits, restore flow to the NCL from any available CCW train.
* ACTION A.1 - Restore DC electrical power subsystem to OPERABLE status within two (2) hours.
CRITICAL TASK BOP TRANSFER the CCW Non-Critical Loop to Train B.
Examiner Note: DNBR may or may not be bypassed.
BOP TRANSFER Letdown Heat Exchanger to Train B CCW.
CRS       DIRECT Bypassing Channel A DNBR and LPD trips.
CRS DETERMINE that loss of 2A04 is NOT due to fire.
M.O. Cue:         When directed, EXECUTE the following remote functions:
M.O. Cue: When directed to investigate 2A0418 overcurrent, WAIT 3 minutes and REPORT an overcurrent flag on Phase B.
RP51 = OPEN          (PPS Door Open Annunciator 56B46)
CRS DIRECT performance of SO23-6-9, 6.9 kV, 4 kV and 480 V Bus Feeder Faults.
RP52C = BYPASS (Channel A Hi Local Power)
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 4 Page 11 of 22 Event
RP52D = BYPASS (Channel A Low DNBR)
Delete RP51          (PPS Door Open Annunciator 56B46)
RO      VERIFY the Trip Channel Bypassed Annunciator alarms.
* 56A29 - PPS CHANNEL 1 TRIP BYPASSED DIRECT setting CEAC 2 INOP Flags in all CPCs by changing each CPC CRS Addressable Constant Point ID 062 to 2.
SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc


== Description:==
Appendix D                                       Operator Action                             Form ES-D-2 Operating Test :       NRC       Scenario #     2       Event #             4       Page 12   of 22 Event
Loss of Bus 2A04 Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc CRS DIRECT performance of AOI SO23-13-26, Loss of Power to an AC Bus, Attachment 3, Equipment Actions for Loss of Bus A04.
BOP ENSURE Train B SWC Pump running.
BOP VERIFY 2G002 Maintenance Lockout Switch in LOCKOUT.
CRS Within 1 hour, DIRECT performance of SO23-3-3.23, Attachment for AC Sources Verification for both Units.
RO PLACE HS-0210, Makeup Mode Selector Switch to MANUAL and PLACE a Caution Tag at the switch to prevent inadvertent dilution.
+5 min CRS EVALUATE Technical Specifications.
LCO 3.8.4.A, DC Sources - Operating.
CONDITION A - One battery or associated control equipment or cabling inoperable. ACTION A.1 - Restore DC electrical power subsystem to OPERABLE status within two (2) hours.
Examiner Note:  DNBR may or may not be bypassed.
CRS DIRECT Bypassing Channel A DNBR and LPD trips.
M.O. Cue: When directed, EXECUTE the following remote functions: RP51 = OPEN  (PPS Door Open Annunciator 56B46) RP52C = BYPASS (Channel A Hi Local Power)
RP52D = BYPASS (Channel A Low DNBR)
Delete RP51  (PPS Door Open Annunciator 56B46)
RO VERIFY the Trip Channel Bypassed Annunciator alarms.
56A29 - PPS CHANNEL 1 TRIP BYPASSED CRS DIRECT setting CEAC 2 INOP Flags in all CPCs by changing each CPC Addressable Constant Point ID 062 to 2.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 4 Page 12 of 22 Event


== Description:==
== Description:==
Loss of Bus 2A04 Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc CRS DIRECT aligning Charging Pump P191 to Train B.
Loss of Bus 2A04 Time         Position                             Applicants Actions or Behavior CRS     DIRECT aligning Charging Pump P191 to Train B.
M.O. Cue: If asked, REPORT Unit 3 Train B Component Cooling Water is operating.
M.O. Cue:         If asked, REPORT Unit 3 Train B Component Cooling Water is operating.
CRS DIRECT initiating Train B CRIS.
CRS     DIRECT initiating Train B CRIS.
BOP INITIATE Train B CRIS.  
BOP     INITIATE Train B CRIS.
+15 min BOP ENSURE A-072 or A-073 Dome Air Circulating Fan running.
+15 min           BOP     ENSURE A-072 or A-073 Dome Air Circulating Fan running.
When Technical Specifications and major Attachment 3 actions have been addressed, or at Lead Evaluator's discretion, PROCEED to Events 5, 6, 7, and 8.  
When Technical Specifications and major Attachment 3 actions have been addressed, or at Lead Evaluators discretion, PROCEED to Events 5, 6, 7, and 8.
SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 5, 6, 7, & 8 Page 13 of 22 Event
Appendix D                                             Operator Action                                 Form ES-D-2 Operating Test :       NRC         Scenario #       2         Event #     5, 6, 7, & 8 Page     13     of   22 Event


== Description:==
== Description:==
Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc Machine Operator: When directed, EXECUTE Events 5, 6, 7, and 8. - TU08, Main Turbine trip. - PG24, Loss of Offsite Power.  
Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time         Position                                   Applicants Actions or Behavior Machine Operator:         When directed, EXECUTE Events 5, 6, 7, and 8.
- EG08B, Emergency Diesel Generator G-003 fails to start.  
                            - TU08, Main Turbine trip.
- FW25, TDAFW Pump overspeed trip (300 seconds post-trip). - CVCS LP, Boric Acid Makeup Tank Gravity Feed Valves fail to open.
                            - PG24, Loss of Offsite Power.
Indications Available
                            - EG08B, Emergency Diesel Generator G-003 fails to start.
: Numerous Loss of Offsite Power related alarms  
                            - FW25, TDAFW Pump overspeed trip (300 seconds post-trip).
+ 10 secs CRS DIRECT performance of SO23-12-1, Standard Post Trip Actions.
                            - CVCS LP, Boric Acid Makeup Tank Gravity Feed Valves fail to open.
RO VERIFY Reactor Trip:
Indications Available:
VERIFY Reactor Trip Circuit Breakers (8) open.
Numerous Loss of Offsite Power related alarms
VERIFY Reactor Power lowering and Startup Rate negative.
+ 10 secs         CRS       DIRECT performance of SO23-12-1, Standard Post Trip Actions.
VERIFY maximum of one full length CEA NOT fully inserted.
RO         VERIFY Reactor Trip:
CRS VERIFY Reactivity Control criteria satisfied.
* VERIFY Reactor Trip Circuit Breakers (8) open.
BOP VERIFY Turbine Trip:
* VERIFY Reactor Power lowering and Startup Rate negative.
VERIFY Main Turbine tripped.
* VERIFY maximum of one full length CEA NOT fully inserted.
HP and LP Stop and Governor Valves closed.
CRS       VERIFY Reactivity Control criteria satisfied.
VERIFY both Unit Output Breakers open.
BOP       VERIFY Turbine Trip:
VERIFY Main Turbine speed < 2000 RPM or lowering.
* VERIFY Main Turbine tripped.
CRS INITIATE Administrative Actions:
* HP and LP Stop and Governor Valves closed.
ANNOUNCE Reactor trip via PA System.
* VERIFY both Unit Output Breakers open.
INITIATE Attachment 4, Worksheet.
* VERIFY Main Turbine speed < 2000 RPM or lowering.
INITIATE Attachment 5, Administrative Actions.
CRS       INITIATE Administrative Actions:
BOP DETERMINE Vital Auxiliaries criteria NOT satisfied:
* ANNOUNCE Reactor trip via PA System.
DETERMINE both 1E 4 kV Buses A04 and A06 deenergized.
* INITIATE Attachment 4, Worksheet.
[RNO] PLACE Train B EDG in Maintenance Lockout.
* INITIATE Attachment 5, Administrative Actions.
[RNO] INITIATE Attachment 2, Diesel Generator Failure Follow-Up Actions for Bus 2A06.
BOP       DETERMINE Vital Auxiliaries criteria NOT satisfied:
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 5, 6, 7, & 8 Page 14 of 22 Event
* DETERMINE both 1E 4 kV Buses A04 and A06 deenergized.
                                  *    [RNO] PLACE Train B EDG in Maintenance Lockout.
                                  *    [RNO] INITIATE Attachment 2, Diesel Generator Failure Follow-Up Actions for Bus 2A06.
SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc
 
Appendix D                                             Operator Action                                 Form ES-D-2 Operating Test :       NRC         Scenario #       2         Event #     5, 6, 7, & 8 Page     14     of   22 Event


== Description:==
== Description:==
Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc DETERMINE both 1E 480 V Buses B04 and B06 deenergized.
Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time         Position                                   Applicants Actions or Behavior
VERIFY all 1E DC Buses energized.
* DETERMINE both 1E 480 V Buses B04 and B06 deenergized.
DETERMINE all Non-1E 4 kV Buses deenergized.
* VERIFY all 1E DC Buses energized.
[RNO] ENSURE MSIVs closed.
* DETERMINE all Non-1E 4 kV Buses deenergized.
[RNO] OPERATE ADVs to maintain 1000 psia.
                                  *    [RNO] ENSURE MSIVs closed.
DETERMINE CCW Train NOT operating and NOT aligned to Non-Critical Loop and Letdown Heat Exchanger.
                                  *    [RNO] OPERATE ADVs to maintain 1000 psia.
M.O. Cue: If directed to investigate 2G003, WAIT 3 minutes then REPORT EDG governor is disconnected.
* DETERMINE CCW Train NOT operating and NOT aligned to Non-Critical Loop and Letdown Heat Exchanger.
Examiner Note:   Depending on the speed at which SPTAs are performed and initial conditions at the time of trip, RCS Inventory and RCS Pressure Control may or may not be satisfied.
M.O. Cue:         If directed to investigate 2G003, WAIT 3 minutes then REPORT EDG governor is disconnected.
RO VERIFY RCS Inventory Control criteria satisfied:
Examiner Note: Depending on the speed at which SPTAs are performed and initial conditions at the time of trip, RCS Inventory and RCS Pressure Control may or may not be satisfied.
VERIFY PZR level between 10% and 70% and trending to between 30%
RO       VERIFY RCS Inventory Control criteria satisfied:
and 60%. VERIFY Core Exit Saturation Margin  20&deg;F:   QSPDS page 611.
* VERIFY PZR level between 10% and 70% and trending to between 30%
CFMS page 311.
and 60%.
RO VERIFY RCS Pressure Control criteria satisfied:
* VERIFY Core Exit Saturation Margin  20&deg;F:
VERIFY PZR pressure (WR and NR) between 1740 PSIA and 2380 PSIA and controlled AND trending between 2025 PSIA and 2275 PSIA.
* QSPDS page 611.
RO DETERMINE Core Heat Removal criteria is NOT satisfied:
* CFMS page 311.
DETERMINE no RCPs are operating.
RO       VERIFY RCS Pressure Control criteria satisfied:
VERIFY Core Exit Saturation Margin  20&deg;F. QSPDS page 611.
* VERIFY PZR pressure (WR and NR) between 1740 PSIA and 2380 PSIA and controlled AND trending between 2025 PSIA and 2275 PSIA.
CFMS page 311.  
RO       DETERMINE Core Heat Removal criteria is NOT satisfied:
* DETERMINE no RCPs are operating.
* VERIFY Core Exit Saturation Margin  20&deg;F.
* QSPDS page 611.
* CFMS page 311.
SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 5, 6, 7, & 8 Page 15 of 22 Event
Appendix D                                             Operator Action                                 Form ES-D-2 Operating Test :       NRC         Scenario #       2         Event #     5, 6, 7, & 8 Page     15     of   22 Event


== Description:==
== Description:==
Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc BOP DETERMINE RCS Heat Removal criteria NOT satisfied:
Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time         Position                                   Applicants Actions or Behavior BOP       DETERMINE RCS Heat Removal criteria NOT satisfied:
VERIFY both SGs level > 21% NR.
* VERIFY both SGs level > 21% NR.
VERIFY both SGs level < 80% NR.
* VERIFY both SGs level < 80% NR.
DETERMINE Auxiliary feedwater NOT available to restore both SGs level between 40% NR and 80% NR.
* DETERMINE Auxiliary feedwater NOT available to restore both SGs level between 40% NR and 80% NR.
[RNO] ENSURE EFAS actuated.
                                  *    [RNO] ENSURE EFAS actuated.
VERIFY heat removal adequate:
* VERIFY heat removal adequate:
T cold trending to between 545&deg;F and 555&deg;F.
* Tcold trending to between 545&deg;F and 555&deg;F.
SG pressures approximately 1000 PSIA.
* SG pressures approximately 1000 PSIA.
Examiner Note: Steam Driven Auxiliary Feedwater Pump P140 will trip on overspeed 300 seconds after start.
Examiner Note: Steam Driven Auxiliary Feedwater Pump P140 will trip on overspeed 300 seconds after start.
BOP RECOGNIZE Aux Feedwater Pump P-140 has tripped by observing alarm 52A53 - TURBINE AUX FW PUMP GOVERNOR OVERSPEED / OOS.
RECOGNIZE Aux Feedwater Pump P-140 has tripped by observing alarm BOP 52A53 - TURBINE AUX FW PUMP GOVERNOR OVERSPEED / OOS.
M.O. Cue: When contacted to investigate the status of 2P140, WAIT 3 minutes then REPORT that the linkage is in the trip position.
M.O. Cue:         When contacted to investigate the status of 2P140, WAIT 3 minutes then REPORT that the linkage is in the trip position.
M.O. Cue: When directed to reset the trip linkage for 2P140, WAIT 3 minutes and REPORT that a linkage pin is broken.
M.O. Cue:         When directed to reset the trip linkage for 2P140, WAIT 3 minutes and REPORT that a linkage pin is broken.
RO VERIFY Containment Isolation criteria satisfied:
RO       VERIFY Containment Isolation criteria satisfied:
VERIFY Containment pressure < 1.5 PSIG.
* VERIFY Containment pressure < 1.5 PSIG.
DETERMINE some Containment Area Radiation Monitors energized and NOT alarming or trending to alarm.
* DETERMINE some Containment Area Radiation Monitors energized and NOT alarming or trending to alarm.
DETERMINE some Secondary Plant Radiation Monitors energized and NOT alarming or trending to alarm.
* DETERMINE some Secondary Plant Radiation Monitors energized and NOT alarming or trending to alarm.
RO VERIFY Containment Temperature and Pressure criteria satisfied:
RO       VERIFY Containment Temperature and Pressure criteria satisfied:
VERIFY Containment average temperature < 120&deg;F.
* VERIFY Containment average temperature < 120&deg;F.
VERIFY Containment pressure < 1.5 PSIG.  
* VERIFY Containment pressure < 1.5 PSIG.
SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 5, 6, 7, & 8 Page 16 of 22 Event
Appendix D                                             Operator Action                                 Form ES-D-2 Operating Test :       NRC         Scenario #       2         Event #     5, 6, 7, & 8 Page     16     of   22 Event


== Description:==
== Description:==
Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc
Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time         Position                                   Applicants Actions or Behavior
  +15 min CRS DIAGNOSE Event in Progress:
  +15 min           CRS       DIAGNOSE Event in Progress:
DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.
* DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.
[RNO] COMPLETE Attachment 1, Recovery Diagnostics.
                                  *  [RNO] COMPLETE Attachment 1, Recovery Diagnostics.
[RNO] DIAGNOSE Loss of Feedwater and Station Blackout.
                                  *  [RNO] DIAGNOSE Loss of Feedwater and Station Blackout.
DETERMINE that Reactor Trip Recovery is NOT diagnosed.
* DETERMINE that Reactor Trip Recovery is NOT diagnosed.
[RNO] DETERMINE all RCPs stopped.
                                  *  [RNO] DETERMINE all RCPs stopped.
DIRECT initiating Steps 12 through 15.
* DIRECT initiating Steps 12 through 15.
BOP INITIATE Steps 12 through 15.
BOP       INITIATE Steps 12 through 15.
M.O. Cue: If SCE GCC is contacted for grid status, REPORT that cause of grid loss is unknown and field crews are investigating. 8 hour estimate on time to restore.
M.O. Cue:         If SCE GCC is contacted for grid status, REPORT that cause of grid loss is unknown and field crews are investigating. 8 hour estimate on time to restore.
M.O. Cue: If Unit 3 status is requested, REPORT that Bus 3A06 is energized from EDG 3G003 and Bus 3A04 is energized from EDG 3G002.
M.O. Cue:         If Unit 3 status is requested, REPORT that Bus 3A06 is energized from EDG 3G003 and Bus 3A04 is energized from EDG 3G002.
CRS DIRECT performance of SO23-12-9, Functional Recovery.
CRS       DIRECT performance of SO23-12-9, Functional Recovery.
RECORD time of EOI entry __________.
* RECORD time of EOI entry __________.
M.O. Cue: When SO23-12-9 is initiated, CALL as SDG&E GCC and REPORT that SONGS Switchyard appears to have several faults and will not be available until a crew can be dispatched to determine the problem. 8 hour estimate on time to restore.
M.O. Cue:         When SO23-12-9 is initiated, CALL as SDG&E GCC and REPORT that SONGS Switchyard appears to have several faults and will not be available until a crew can be dispatched to determine the problem. 8 hour estimate on time to restore.
M.O. Cue: If asked, EXECUTE remote function ED81 and transfer Q0612 Instrument Bus #2 to Emergency.
M.O. Cue:         If asked, EXECUTE remote function ED81 and transfer Q0612 Instrument Bus #2 to Emergency.
CRS VERIFY Functional Recovery diagnosis:
CRS       VERIFY Functional Recovery diagnosis:
INITIATE SO23-12-10, Safety Function Status Checks.
* INITIATE SO23-12-10, Safety Function Status Checks.
INITIATE Foldout Page.
* INITIATE Foldout Page.
DIRECT performance of FS-3, Monitor Natural Circulation.
* DIRECT performance of FS-3, Monitor Natural Circulation.
DIRECT performance of SO23-12-11, Attachment 19, Non-1E DC Load Reduction.
* DIRECT performance of SO23-12-11, Attachment 19, Non-1E DC Load Reduction.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 5, 6, 7, & 8 Page 17 of 22 Event
SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc


== Description:==
Appendix D                                             Operator Action                                 Form ES-D-2 Operating Test :       NRC         Scenario #       2         Event #     5, 6, 7, & 8 Page     17      of   22 Event
Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc DIRECT performance of SO23-12-11, Attachment 20, Class 1E Battery Load Reduction.
DIRECT performance of FS-18, Secondary Plant Protection.
DIRECT performance of SO23-12-11, Attachment 24, Supply 1E  4 kV Bus with Opposite Unit Diesel.
DIRECT performance of SO23-12-11, Attachment 6, Diesel Generator Failure Follow-up Actions.
DIRECT performance of SO23-12-11, Attachment 8, Restoration of Offsite Power.
DIRECT performance of SO23-12-11, FS-11, Reset P140 Overspeed Trip.
DIRECT Chemistry to sample both SGs for radioactivity and boron.
M.O. Cue:  If directed to sample SGs, WAIT 5 minutes and REPORT that E088 and E089 sample lines were frisked, and both have activity near background. If the SG sample valves are closed, REPORT that you are unable to establish sample flow.
M.O. Cue: When directed to initiate Non-1E DC Load Reduction, ACKNOWLEDGE and STATE you will report when complete.
M.O. Cue: When directed to initiate Class 1E Battery Load Reduction, ACKNOWLEDGE and STATE you will report when complete.
Examiner Note:  The following steps are from SO23-12-9, Functional Recovery.
CRS INITIATE Administrative Actions.
CRS DETERMINE ESF actuation not required.
CRS EVALUATE Immediate Safety Function Recovery Actions.
CRS INITIATE Attachment FR-5, Recovery-Heat Removal Success Path HR-1, Step 4.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 5, 6, 7, & 8 Page 18 of 22 Event


== Description:==
== Description:==
Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc Examiner Note:  The following steps are from Attachment 24, Supplying 1E 4 kV Bus with Opposite Unit Diesel. Attachment FR-5, Recovery-Heat Removal Success steps are addressed later in the scenario.
Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time         Position                                   Applicants Actions or Behavior
CRS DIRECT performance of SO23-12-11, Attachment 24, Supplying 1E 4 kV Bus
* DIRECT performance of SO23-12-11, Attachment 20, Class 1E Battery Load Reduction.
* DIRECT performance of FS-18, Secondary Plant Protection.
* DIRECT performance of SO23-12-11, Attachment 24, Supply 1E 4 kV Bus with Opposite Unit Diesel.
* DIRECT performance of SO23-12-11, Attachment 6, Diesel Generator Failure Follow-up Actions.
* DIRECT performance of SO23-12-11, Attachment 8, Restoration of Offsite Power.
* DIRECT performance of SO23-12-11, FS-11, Reset P140 Overspeed Trip.
* DIRECT Chemistry to sample both SGs for radioactivity and boron.
M.O. Cue:        If directed to sample SGs, WAIT 5 minutes and REPORT that E088 and E089 sample lines were frisked, and both have activity near background. If the SG sample valves are closed, REPORT that you are unable to establish sample flow.
M.O. Cue:        When directed to initiate Non-1E DC Load Reduction, ACKNOWLEDGE and STATE you will report when complete.
M.O. Cue:        When directed to initiate Class 1E Battery Load Reduction, ACKNOWLEDGE and STATE you will report when complete.
Examiner Note:          The following steps are from SO23-12-9, Functional Recovery.
CRS      INITIATE Administrative Actions.
CRS      DETERMINE ESF actuation not required.
CRS      EVALUATE Immediate Safety Function Recovery Actions.
INITIATE Attachment FR-5, Recovery-Heat Removal Success Path HR-1, CRS Step 4.
SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc


with Opposite Unit Diesel.
Appendix D                                             Operator Action                                 Form ES-D-2 Operating Test :       NRC         Scenario #       2         Event #     5, 6, 7, & 8 Page     18      of   22 Event
CRS DETERMINE Train B is available.
CRS OBTAIN approval of Shift Manager to cross connect Train B using 10 CFR 50.54(x) on both Units to supply 1E 4 kV Bus 2A06 with the opposite unit Diesel Generator.
CRS/BOP REQUEST SM initiates NRC notification within one hour regarding actions per this attachment.
CRS/BOP NOTIFY opposite Unit SRO that automatic sequencing of ESF loads onto opposite Unit 1E 4 kV Bus 3A06 will be blocked.
BOP VERIFY Bus 3A06 energized by 3G003 Diesel Generator.
BOP ENSURE 1E 4 kV Bus Tie breaker AUTO/MANUAL transfer switches selected to MANUAL.
2A0619 (2HS-1639B2) and 3A0603 (3HS-1639B2).
BOP ENSURE 1E 4 kV Bus Tie breakers open.
2A0619 and 3A0603.
BOP ENSURE 2G003 Diesel Generator selected to MAINTENANCE LOCKOUT.
CRS DIRECT performance of Train B Diesel Generator Cross-Tie Permissive switch alignment on 50' Elevation.
BOP CONTACT the PPEO and INITIATE Unit 2 Train B Diesel Generator
 
Cross-Tie Permissive switch alignment on 50' Elevation.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 5, 6, 7, & 8 Page 19 of 22 Event


== Description:==
== Description:==
Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc VERIFY feeder faults NOT indicated by relay flags on:
Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time         Position                                   Applicants Actions or Behavior Examiner Note:          The following steps are from Attachment 24, Supplying 1E 4 kV Bus with Opposite Unit Diesel. Attachment FR-5, Recovery-Heat Removal Success steps are addressed later in the scenario.
2A0616 - Unit Aux Transformer 2A0618 - Reserve Aux Transformer 2A0619 - 2A06 Bus Tie 2A0613 - 2G003 EDG M.O. Cue: When asked, REPORT no feeder faults on breakers.
DIRECT performance of SO23-12-11, Attachment 24, Supplying 1E 4 kV Bus CRS with Opposite Unit Diesel.
BOP DIRECT the PPEO to SELECT both Unit 2 Train B Diesel Generator Cross-Tie Permissive switches on Fire Isolation Panel 2L-413 to 50.54X.
CRS        DETERMINE Train B is available.
2HS-5054XA2 and 2HS-5054XB2 M.O. Cue: When directed, PERFORM remote functions EG62A and EG62B and REPORT that the Unit 2 50.54X switches have been aligned.
OBTAIN approval of Shift Manager to cross connect Train B using CRS        10 CFR 50.54(x) on both Units to supply 1E 4 kV Bus 2A06 with the opposite unit Diesel Generator.
BOP CONTACT the PPEO and INITIATE Unit 3 Train B Diesel Generator  
REQUEST SM initiates NRC notification within one hour regarding actions CRS/BOP per this attachment.
NOTIFY opposite Unit SRO that automatic sequencing of ESF loads onto CRS/BOP opposite Unit 1E 4 kV Bus 3A06 will be blocked.
BOP        VERIFY Bus 3A06 energized by 3G003 Diesel Generator.
ENSURE 1E 4 kV Bus Tie breaker AUTO/MANUAL transfer switches BOP selected to MANUAL.
* 2A0619 (2HS-1639B2) and 3A0603 (3HS-1639B2).
BOP        ENSURE 1E 4 kV Bus Tie breakers open.
* 2A0619 and 3A0603.
BOP        ENSURE 2G003 Diesel Generator selected to MAINTENANCE LOCKOUT.
DIRECT performance of Train B Diesel Generator Cross-Tie Permissive CRS switch alignment on 50' Elevation.
CONTACT the PPEO and INITIATE Unit 2 Train B Diesel Generator BOP Cross-Tie Permissive switch alignment on 50' Elevation.
SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc


Cross-Tie Permissive switch alignment on 50' Elevation.
Appendix D                                             Operator Action                                 Form ES-D-2 Operating Test :       NRC         Scenario #       2         Event #     5, 6, 7, & 8 Page     19      of   22 Event
VERIFY feeder faults NOT indicated by relay flags on:
3A0603 - 3A06 Bus Tie M.O. Cue: When asked, REPORT no feeder faults on breaker.
BOP DIRECT the PPEO to SELECT both Unit 3 Train B Diesel Generator Cross-Tie Permissive switches on Fire Isolation Panel 3L-413 to 50.54X.
3HS-5054XA2 and 3HS-5054XB2 M.O. Cue: When directed, PERFORM remote functions EG62C and EG62D and REPORT that the Unit 3 50.54X switches have been aligned.
BOP VERIFY 3G003 Diesel Generator loading less than 3.4 MW.
BOP VERIFY Bus 2A06 NOT energized.
BOP VERIFY Unit 2 overcurrent/ground alarms reset.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 5, 6, 7, & 8 Page 20 of 22 Event


== Description:==
== Description:==
Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc 63C15 - 2A06 SUPPLY BKR 2A0616 OC 63C25 - 2A06 SUPPLY BKR 2A0618 OC BOP VERIFY 1E DC Bus voltages 2D2 and 3D2 greater than 108 VDC.
Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time         Position                                   Applicants Actions or Behavior
M.O. Cue: When asked, REPORT 3D2 voltage at 129 VDC.
* VERIFY feeder faults NOT indicated by relay flags on:
BOP ESTABLISH final Train B configuration.
* 2A0616 - Unit Aux Transformer
BOP ENSURE 1E 4 kV Bus 2A06 supply breakers open.
* 2A0618 - Reserve Aux Transformer
2A0616 - Unit Aux Transformer 2A0618 - Reserve Aux Transformer 2A0613 - 2G003 EDG BOP ENSURE 1E 4 kV Bus A06 tie breakers open.
* 2A0619 - 2A06 Bus Tie
2A0619 - 2A06 Bus Tie 3A0603 - 3A06 Bus Tie BOP ENSURE 1E 4 kV Bus 2A06 load breakers open.
* 2A0613 - 2G003 EDG M.O. Cue:         When asked, REPORT no feeder faults on breakers.
Emergency Chillers Containment Spray Pumps HPSI Pumps LPSI Pumps AFW Pump CCW Pumps SWC Pumps BOP VERIFY Train B Diesel Generator Cross-Tie Permissive Switches on both Units are in the 50.54X position.
DIRECT the PPEO to SELECT both Unit 2 Train B Diesel Generator BOP Cross-Tie Permissive switches on Fire Isolation Panel 2L-413 to 50.54X.
BOP CLOSE Unit 3 Bus Tie breaker 3A0603.  
* 2HS-5054XA2 and 2HS-5054XB2 M.O. Cue:        When directed, PERFORM remote functions EG62A and EG62B and REPORT that the Unit 2 50.54X switches have been aligned.
CONTACT the PPEO and INITIATE Unit 3 Train B Diesel Generator BOP Cross-Tie Permissive switch alignment on 50' Elevation.
* VERIFY feeder faults NOT indicated by relay flags on:
* 3A0603 - 3A06 Bus Tie M.O. Cue:        When asked, REPORT no feeder faults on breaker.
DIRECT the PPEO to SELECT both Unit 3 Train B Diesel Generator BOP Cross-Tie Permissive switches on Fire Isolation Panel 3L-413 to 50.54X.
* 3HS-5054XA2 and 3HS-5054XB2 M.O. Cue:        When directed, PERFORM remote functions EG62C and EG62D and REPORT that the Unit 3 50.54X switches have been aligned.
BOP     VERIFY 3G003 Diesel Generator loading less than 3.4 MW.
BOP      VERIFY Bus 2A06 NOT energized.
BOP      VERIFY Unit 2 overcurrent/ground alarms reset.
SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 5, 6, 7, & 8 Page 21 of 22 Event
Appendix D                                             Operator Action                                 Form ES-D-2 Operating Test :       NRC         Scenario #       2         Event #     5, 6, 7, & 8 Page     20      of   22 Event


== Description:==
== Description:==
Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc BOP VERIFY Unit 3 Diesel Generator 3G003 output breaker remains closed.
Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time         Position                                   Applicants Actions or Behavior
CRITICAL TASK STATEMENT With a loss of 1E power, energize at least one 4 kV and the associated 480 VAC 1E Bus before DC Bus D2 voltage drops to 107.3 VDC and DC Bus D4 drops to 106.5 VDC.
* 63C15 - 2A06 SUPPLY BKR 2A0616 OC
CRITICAL TASK BOP CLOSE Unit 2 Bus Tie breaker 2A0619.
* 63C25 - 2A06 SUPPLY BKR 2A0618 OC BOP       VERIFY 1E DC Bus voltages 2D2 and 3D2 greater than 108 VDC.
BOP VERIFY Unit 2 1E buses 2A06 and 2B06 energized.
M.O. Cue:        When asked, REPORT 3D2 voltage at 129 VDC.
BOP START CCW Pump P026 on Train B.
BOP       ESTABLISH final Train B configuration.
RO VERIFY Charging Pump P192 starts on Train B.
BOP       ENSURE 1E 4 kV Bus 2A06 supply breakers open.
RO VERIFY Saltwater Cooling Pump starts on Train B.
* 2A0616 - Unit Aux Transformer
Examiner Note:  The following steps are from SO23-12-9, Functional Recovery, Attachment  FR-5, Recovery-Heat Removal Success.
* 2A0618 - Reserve Aux Transformer
BOP DETERMINE AFW NOT operating.
* 2A0613 - 2G003 EDG BOP      ENSURE 1E 4 kV Bus A06 tie breakers open.
BOP DETERMINE TDAFW Pump tripped on overspeed.
* 2A0619 - 2A06 Bus Tie
BOP VERIFY AFW Pump P504 available.
* 3A0603 - 3A06 Bus Tie BOP      ENSURE 1E 4 kV Bus 2A06 load breakers open.
BOP CLOSE AFW Pump P504 Discharge Valves.
* Emergency Chillers
HV-4712 and HV-4762.
* Containment Spray Pumps
BOP START AFW Pump P504.
* HPSI Pumps
Examiner Note:  Throttling of Auxiliary Feedwater flow may or may not be required depending upon Steam Generator level.  
* LPSI Pumps
* AFW Pump
* CCW Pumps
* SWC Pumps VERIFY Train B Diesel Generator Cross-Tie Permissive Switches on both BOP Units are in the 50.54X position.
BOP       CLOSE Unit 3 Bus Tie breaker 3A0603.
SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 5, 6, 7, & 8 Page 22 of 22 Event
Appendix D                                             Operator Action                                 Form ES-D-2 Operating Test :       NRC         Scenario #       2         Event #     5, 6, 7, & 8 Page     21      of   22 Event


== Description:==
== Description:==
Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc BOP OVERRIDE and OPEN AFW Pump P504 Discharge Bypass Valve HV-4762 to 35% open.
Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time         Position                                   Applicants Actions or Behavior BOP       VERIFY Unit 3 Diesel Generator 3G003 output breaker remains closed.
[RNO]  THROTTLE AFW Pump P-504 Discharge Valve HV-4712 to maintain flow between 130 GPM and 150 GPM.
With a loss of 1E power, energize at least one 4 kV and the associated 480 VAC CRITICAL TASK 1E Bus before DC Bus D2 voltage drops to 107.3 VDC and DC Bus D4 drops to STATEMENT 106.5 VDC.
M.O. Cue: If necessary, EXECUTE the following remote functions as directed by the Control Room: - FW86, P504 Manual Valve HV-4712. - FW104, P140 Discharge Valve MU122. - FW105A, P141 Discharge Valve MU127. - FW102, P504 Discharge Valve MU533.
CRITICAL TASK BOP        CLOSE Unit 2 Bus Tie breaker 2A0619.
CRITICAL TASK STATEMENT Restore feedwater flow to at least one Steam Generator prior to complete loss of secondary inventory in both Steam Generators.
BOP       VERIFY Unit 2 1E buses 2A06 and 2B06 energized.
CRITICAL TASK BOP THROTTLE HV-4712 to maintain AFW flow between 130 and 150 GPM and MAINTAIN reduced AFW flow for 5 minutes.
BOP       START CCW Pump P026 on Train B.
BOP RAISE total AFW flow to greater than 400 gpm.
RO        VERIFY Charging Pump P192 starts on Train B.
Floor Cue: if necessary, REPORT as Shift Manager to continue actions in SO23-12-9, Functional Recovery.
RO        VERIFY Saltwater Cooling Pump starts on Train B.
Examiner Note: The following steps are from SO23-12-9, Functional Recovery, Step 6c.
Examiner Note:           The following steps are from SO23-12-9, Functional Recovery, Attachment FR-5, Recovery-Heat Removal Success.
CRS DIRECT initiation of boration greater than 40 GPM.
BOP        DETERMINE AFW NOT operating.
RO COMMENCE boration of the RCS using BAMU Tank Gravity Feed Valves.  
BOP        DETERMINE TDAFW Pump tripped on overspeed.
+30 min RO DETERMINE BAMU Tank Gravity Feed Valves will NOT open and INITIATE boration of the RCS using LV-0227C, Refueling Water Storage Tank to Charging Pump Gravity Feed Valve.
BOP        VERIFY AFW Pump P504 available.
When power is restored to Bus 2A06, feedwater flow is restored, and a boration is commenced, or at Lead Evaluator's discretion, TERMINATE the scenario.
BOP        CLOSE AFW Pump P504 Discharge Valves.
* HV-4712 and HV-4762.
BOP        START AFW Pump P504.
Examiner Note:          Throttling of Auxiliary Feedwater flow may or may not be required depending upon Steam Generator level.
SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc


Appendix D Scenario Outline Form ES-D-1 SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc Facility: SONGS 2 and 3 Scenario No.: 3 Op Test No.: October 2009 NRC Examiners:  Operators:
Appendix D                                             Operator Action                                  Form ES-D-2 Operating Test :        NRC         Scenario #       2         Event #      5, 6, 7, & 8 Page    22      of    22 Event
Initial Conditions: 31% power MOC - RCS Boron is 1243 ppm (by sample). Train A Component Cooling Water Pump (P-025) in service. Train A Low Pressure Safety Injection Pump (P-015) OOS for oil change. Fire Computer is OOS. Turnover: Dilution and power ascension in progress at 10% per hour.
Critical Tasks:  Establish Reactivity Control (Two Full Length CEAs Not Fully Inserted & No SIAS).
Manually Initiate Main Steam Isolation Signal (Auto Actuation failure). Event No. Malf. No. Event Type* Event Description 1 +15 min  R (RO)  N (BOP, CRS) Dilution and power ascension at 10% per hour.


2 +25 min RC09A TS (CRS) Reactor Coolant Pump (P-002) Speed Sensor (SE-0143-1) failure.
== Description:==
3 +35 min CV16B I (RO, CRS)
Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time          Position                                  Applicants Actions or Behavior OVERRIDE and OPEN AFW Pump P504 Discharge Bypass Valve HV-4762 BOP to 35% open.
Volume Control Tank Level Transmitter (LT-0227) fails low.
                            *    [RNO] THROTTLE AFW Pump P-504 Discharge Valve HV-4712 to maintain flow between 130 GPM and 150 GPM.
4 +50 min ED06D C (RO, BOP, CRS)
M.O. Cue:        If necessary, EXECUTE the following remote functions as directed by the Control Room:
TS (CRS) Overcurrent trip of Feeder Breaker to 1E 480 Volt Bus 2B04.
                  - FW86, P504 Manual Valve HV-4712.
5 +55 min FW LP RX LP C (BOP, CRS) Main Feedwater Pump trip.
                  - FW104, P140 Discharge Valve MU122.
Primary Side Reactor Trip pushbuttons disabled.
                  - FW105A, P141 Discharge Valve MU127.
6 +60 min MS04B M (RO, BOP, CRS)
                  - FW102, P504 Discharge Valve MU533.
CRITICAL TASK            Restore feedwater flow to at least one Steam Generator prior to complete loss STATEMENT              of secondary inventory in both Steam Generators.
CRITICAL                    THROTTLE HV-4712 to maintain AFW flow between 130 and 150 GPM and TASK BOP MAINTAIN reduced AFW flow for 5 minutes.
BOP       RAISE total AFW flow to greater than 400 gpm.
Floor Cue:        if necessary, REPORT as Shift Manager to continue actions in SO23-12-9, Functional Recovery.
Examiner Note:          The following steps are from SO23-12-9, Functional Recovery, Step 6c.
CRS       DIRECT initiation of boration greater than 40 GPM.
RO      COMMENCE boration of the RCS using BAMU Tank Gravity Feed Valves.
DETERMINE BAMU Tank Gravity Feed Valves will NOT open and INITIATE
+30 min           RO       boration of the RCS using LV-0227C, Refueling Water Storage Tank to Charging Pump Gravity Feed Valve.
When power is restored to Bus 2A06, feedwater flow is restored, and a boration is commenced, or at Lead Evaluators discretion, TERMINATE the scenario.
SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc


Excess Steam Demand Event downstream of Main Steam Isolation Valves (300 second ramp).
Appendix D                                      Scenario Outline                                    Form ES-D-1 Facility:        SONGS 2 and 3                  Scenario No.:        3    Op Test No.:      October 2009 NRC Examiners:                                                  Operators:
7 +60 min RD1402 RD1502 C (RO)
Initial Conditions:
Two CEAs fail to insert on the trip. Emergency boration via gravity feed due to loss of 1E Bus 2B04.
* 31% power MOC - RCS Boron is 1243 ppm (by sample).
8 +65 min MSIS LP I (BOP)
* Train A Component Cooling Water Pump (P-025) in service.
Main Steam Isolation Signal fails to actuate; manual actuation required. * (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor,   (TS)Technical Specifications  
* Train A Low Pressure Safety Injection Pump (P-015) OOS for oil change.
* Fire Computer is OOS.
Turnover:              Dilution and power ascension in progress at 10% per hour.
Critical Tasks:
* Establish Reactivity Control (Two Full Length CEAs Not Fully Inserted & No SIAS).
* Manually Initiate Main Steam Isolation Signal (Auto Actuation failure).
Event No.      Malf. No.      Event Type*                                Event Description 1                  R (RO)                Dilution and power ascension at 10% per hour.
+15 min                  N (BOP, CRS) 2      RC09A      TS (CRS)              Reactor Coolant Pump (P-002) Speed Sensor (SE-0143-1) failure.
+25 min 3      CV16B      I (RO, CRS)            Volume Control Tank Level Transmitter (LT-0227) fails low.
+35 min 4      ED06D      C (RO, BOP, CRS) Overcurrent trip of Feeder Breaker to 1E 480 Volt Bus 2B04.
+50 min                  TS (CRS) 5      FW LP      C (BOP, CRS)          Main Feedwater Pump trip.
+55 min      RX LP                              Primary Side Reactor Trip pushbuttons disabled.
6      MS04B      M (RO, BOP, CRS) Excess Steam Demand Event downstream of Main Steam Isolation
+60 min                                        Valves (300 second ramp).
7       RD1402     C (RO)                 Two CEAs fail to insert on the trip. Emergency boration via gravity
+60 min      RD1502                            feed due to loss of 1E Bus 2B04.
8       MSIS LP     I (BOP)               Main Steam Isolation Signal fails to actuate; manual actuation
+65 min                                        required.
    *   (N)ormal,   (R)eactivity, (I)nstrument,   (C)omponent,     (M)ajor, (TS)Technical Specifications SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc


Appendix D Scenario Outline Form ES-D-1 SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc SCENARIO  
Appendix D                                 Scenario Outline                             Form ES-D-1 SCENARIO  


==SUMMARY==
==SUMMARY==
NRC #3 The crew will assume the watch and resume a dilution and power ascension per Operating Instruction (OI) SO23-5-1.7, Power Operations at 10% per hour.
NRC #3 The crew will assume the watch and resume a dilution and power ascension per Operating Instruction (OI) SO23-5-1.7, Power Operations at 10% per hour.
 
The next event is a Reactor Coolant Pump speed sensor failure. The crew will respond per the Annunciator Response Procedures (ARP) and place the appropriate Reactor Protection System trips in Bypass per Abnormal Operating Instruction (AOI) SO23-13-18, Reactor Protection System Failure/Loss of Vital Bus and Operating Instruction (OI) SO23-3-2.12, Reactor Protective System Operation. The CRS will evaluate Technical Specifications.
The next event is a Reactor Coolant Pump speed sensor failure. The crew will respond per the Annunciator Response Procedures (ARP) and place the appropriate Reactor Protection System trips in Bypass per Abnormal Operating Instruction (AOI) SO23-13-18, Reactor Protection System Failure/Loss of Vital Bus and Operating Instruction (OI) SO23-3-2.12, Reactor Protective System Operation. The CRS will evaluate Technical Specifications.  
When Technical Specifications have been addressed, a Volume Control Tank (VCT) level transmitter fails low and transfers Charging Pump suction to the Refueling Water Storage Tank. The crew will align LV-0227B, VCT Outlet Valve and refer to Operating Instruction (OI) SO23-3-2.1, CVCS Operations and/or SO23-3-2.2, Makeup Operations.
 
The next event is the overcurrent trip of the feeder breaker to 1E 480 Volt Bus 2B04. The crew will respond per AOI SO23-13-26, Loss of Power to an AC Bus. Crew actions include restoring Charging flow as required and placing the Train A Emergency Diesel Generator in Maintenance Lockout. The CRS will evaluate Technical Specifications.
When Technical Specifications have been addressed, a Volume Control Tank (VCT) level transmitter fails low and transfers Charging Pump suction to the Refueling Water Storage Tank. The crew will align LV-0227B, VCT Outlet Valve and refer to Operating Instruction (OI) SO23-3-2.1, CVCS Operations and/or SO23-3-2.2, Makeup Operations.
During the next event, the running of Main Feedwater Pump will trip. The crew will determine that a Reactor and Turbine trip are required. The Primary Side Reactor Trip pushbuttons are disabled and the BOP will trip the Reactor.
 
When the Reactor and Turbine are tripped, an Excess Steam Demand Event (ESDE) downstream of the Main Steam Isolation Valves will occur. The crew should determine that an ESDE is occurring and manually trip the Reactor and Turbine. Entry into Emergency Operating Instruction (EOI) SO23-12-1, Standard Post Trip Actions is required. A transition will then be made to EOI SO23-12-5, Excess Steam Demand Event. Two (2) Control Element Assemblies will fail to insert on the trip and an emergency boration using the Gravity Feed Valves is required. Additionally, a manual Main Steam Isolation Signal must be generated.
The next event is the overcurrent trip of the feeder breaker to 1E 480 Volt Bus 2B04. The crew will respond per AOI SO23-13-26, Loss of Power to an AC Bus. Crew actions include restoring Charging flow as required and placing the Train A Emergency Diesel Generator in Maintenance Lockout. The CRS will evaluate Technical Specifications.  
This scenario is terminated when the Main Steam Isolation Valves are closed and Reactor Coolant System temperature control is restored using the Atmospheric Dump Valves.
 
During the next event, the running of Main Feedwater Pump will trip. The crew will determine that a Reactor and Turbine trip are required. The Primary Side Reactor Trip pushbuttons are disabled and the BOP will trip the Reactor.  
 
When the Reactor and Turbine are tripped, an Excess Steam Demand Event (ESDE) downstream of the Main Steam Isolation Valves will occur. The crew should determine that an ESDE is occurring and  
 
manually trip the Reactor and Turbine. Entry into Emergency Operating Instruction (EOI) SO23-12-1, Standard Post Trip Actions is required. A transition will then be made to EOI SO23-12-5, Excess Steam Demand Event. Two (2) Control Element Assemblies will fail to insert on the trip and an emergency boration using the Gravity Feed Valves is required. Additionally, a manual Main Steam Isolation Signal  
 
must be generated.
 
This scenario is terminated when the Main Steam Isolation Valves are closed and Reactor Coolant System temperature control is restored using the Atmospheric Dump Valves.  
 
Risk Significance:
Risk Significance:
Risk important components out of service: Low Pressure Safety Injection Pump (P-015)
* Risk important components out of service:           Low Pressure Safety Injection Pump (P-015)
Failure of risk important system prior to trip: Loss of 1E 480 V Bus 2B04 Risk significant core damage sequence: ESDE with MSIS failure Risk significant operator actions:   Initiate Emergency Boration Manually Initiate MSIS Establish RCS Temperature Control  
* Failure of risk important system prior to trip:     Loss of 1E 480 V Bus 2B04
* Risk significant core damage sequence:               ESDE with MSIS failure
* Risk significant operator actions:                   Initiate Emergency Boration Manually Initiate MSIS Establish RCS Temperature Control SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc


Scenario Event Description NRC Scenario #3 SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc      SONGS 2009 Facility NRC Initial License Examination Simulator Scenario Setup Machine Operator: EXECUTE IC #223 and NRC Scenario #3 SETUP file to align components.
Scenario Event Description NRC Scenario #3 SONGS 2009 Facility NRC Initial License Examination Simulator Scenario Setup Machine Operator:     EXECUTE IC #223 and NRC Scenario #3 SETUP file to align components.
HANG Control Board Tags on P-015.
HANG Control Board Tags on P-015.
CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario born concentration.
CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario born concentration.
Line 2,213: Line 3,012:
ENSURE Main Turbine Load is set for 1.9 MWe/min.
ENSURE Main Turbine Load is set for 1.9 MWe/min.
VERIFY 2FV-9253 is in AUTO / CLOSE when stopping the dilution for turnover.
VERIFY 2FV-9253 is in AUTO / CLOSE when stopping the dilution for turnover.
PLACE procedures in progress on the RO desk:  
PLACE procedures in progress on the RO desk:
- Copy of SO32-5-1.7, Power Operations open to Section 6.3, Turbine Load Change Using Setpoint Adjustment.  
                      - Copy of SO32-5-1.7, Power Operations open to Section 6.3, Turbine Load Change Using Setpoint Adjustment.
- MARKED UP copy of SO23-5-1.7, Attachment 9.
                      - MARKED UP copy of SO23-5-1.7, Attachment 9.
- MARKED UP copy of SO23-3-2.2 with Steps 6.5.1 through 6.5.8 checked off. - Copy of SO23-3-1.10 open to Section 6.3, Forcing Pressurizer Sprays.
                      - MARKED UP copy of SO23-3-2.2 with Steps 6.5.1 through 6.5.8 checked off.
- Copy of SO23-10-1, Turbine Startup and Normal Operation, Attachment 6, MSR Warmup.
                      - Copy of SO23-3-1.10 open to Section 6.3, Forcing Pressurizer Sprays.
                      - Copy of SO23-10-1, Turbine Startup and Normal Operation, Attachment 6, MSR Warmup.
VERIFY MOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board.
VERIFY MOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board.
If Group Position(s) is (are) not correct, MOVE CEAs and then RETURN CEAs to Shift Turnover Sheet position (Group 6 @ 125 / PLCEAs @ 115).
If Group Position(s) is (are) not correct, MOVE CEAs and then RETURN CEAs to Shift Turnover Sheet position (Group 6 @ 125 / PLCEAs @ 115).
Significant Control Room Annunciators in Alarm
Significant Control Room Annunciators in Alarm:
: 57A51 - SI / ECW TRAIN A INOPERABLE 56A30/40/50/60 - LOSS OF LOAD CHANNEL 1/2/3/4 TRIP DISABLED 53A03 - MFWP TURBINE K006 TRIP 53B23 - CONDENSATE FLOW BALANCE TROUBLE  
57A51 - SI / ECW TRAIN A INOPERABLE 56A30/40/50/60 - LOSS OF LOAD CHANNEL 1/2/3/4 TRIP DISABLED 53A03 - MFWP TURBINE K006 TRIP 53B23 - CONDENSATE FLOW BALANCE TROUBLE SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 1 Page 4 of 17 Event
Appendix D                                           Operator Action                           Form ES-D-2 Operating Test :       NRC       Scenario #       3       Event #           1       Page 4   of 17 Event


== Description:==
== Description:==
Dilution and Power Ascension at 10% per hour Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc Machine Operator: When Shift Turnover is complete, PLACE Simulator in RUN.
Dilution and Power Ascension at 10% per hour Time         Position                               Applicants Actions or Behavior Machine Operator:         When Shift Turnover is complete, PLACE Simulator in RUN.
+1 min CRS DIRECT performance of SO23-5-1.7, Power Operations, SO23-3-2.2, Makeup Operations, and SO23-10-1, Turbine Startup and Normal Operation.
DIRECT performance of SO23-5-1.7, Power Operations, SO23-3-2.2,
RO VERIFY Batch Counter and Makeup Integrator settings.
+1 min            CRS Makeup Operations, and SO23-10-1, Turbine Startup and Normal Operation.
RO PERFORM dilution valve alignment.
RO       VERIFY Batch Counter and Makeup Integrator settings.
PLACE FV-9253 in OPEN.
RO       PERFORM dilution valve alignment.
VERIFY FIC-0210X in AUTO at ~16.5 gpm.
* PLACE FV-9253 in OPEN.
PLACE HS-0210 in DILUTE.
* VERIFY FIC-0210X in AUTO at ~16.5 gpm.
RO VERIFY Tcold changing as dilution progresses.
* PLACE HS-0210 in DILUTE.
RO ADJUST CEAs as required for ASI control.  
RO       VERIFY Tcold changing as dilution progresses.
+15 min BOP MAINTAIN Tcold within required band by raising Main Generator load using HS-2210, Main Turbine Speed Load Control to RAISE or as outlined in SO23-5-1.7, Section 6.3.
RO       ADJUST CEAs as required for ASI control.
Floor Cue: If asked, REPORT as Shift Manager that the 2 nd Main Feedwater Pump will be started prior to transferring power to the Unit Auxiliary Transformer.
MAINTAIN Tcold within required band by raising Main Generator load using
When power has been raised 3 to 5%, or at Lead Evaluator's discretion, PROCEED to Event 2.
+15 min          BOP      HS-2210, Main Turbine Speed Load Control to RAISE or as outlined in SO23-5-1.7, Section 6.3.
Floor Cue:       If asked, REPORT as Shift Manager that the 2nd Main Feedwater Pump will be started prior to transferring power to the Unit Auxiliary Transformer.
When power has been raised 3 to 5%, or at Lead Evaluators discretion, PROCEED to Event 2.
SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 2 Page 5 of 17 Event
Appendix D                                         Operator Action                           Form ES-D-2 Operating Test :       NRC         Scenario #   3       Event #           2       Page 5   of 17 Event


== Description:==
== Description:==
Reactor Coolant Pump Speed Sensor Failure Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc Machine Operator: When directed, EXECUTE Event 2. - RC09A, Reactor Coolant Pump (P-002) Speed Sensor (SE-0143-1) failure.
Reactor Coolant Pump Speed Sensor Failure Time         Position                             Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 2.
Indications Available
                          - RC09A, Reactor Coolant Pump (P-002) Speed Sensor (SE-0143-1) failure.
: 56A04 - DNBR LO CHANNEL TRIP 56A14 - DNBR LO RPS PRETRIP  
Indications Available:
56A04 - DNBR LO CHANNEL TRIP 56A14 - DNBR LO RPS PRETRIP 56B06 - PPS CHANNEL 1 TROUBLE 56C01 - CPC CHANNEL 1 SENSOR FAILURE
+30 sec        RO/BOP        REFER to Annunciator Response Procedures.
RECOGNIZE CPC Channel 1 sensor failure and INFORM the CRS RO SO23-13-18, Reactor Protection System Failure entry required.
DIRECT performance of SO23-13-18, Reactor Protection System Failure /
CRS Loss of Vital Bus.
REFER to SO23-3-2.13, Core Protection / Control Element Assembly RO        Calculator Operation and DETERMINE Reactor Coolant Pump P-002 has a failed speed sensor.
REFER to Attachment 5 and DETERMINE Functional Unit affected is CRS Reactor Coolant Pump P-002 Speed.
PLACE the affected Functional Unit in BYPASS per SO23-3-2.12, Section for RO Bypass Operation of Trip Channels.
RO        VERIFY that the same bistable is not in BYPASS on any other Channel.
M.O. Cue:        When directed, EXECUTE the following Remote Functions:
RP51 = OPEN            (PPS Door Open Annunciator 56B46)
RP52C = BYPASS (High LPD Channel A)
RP52D = BYPASS (Low DNBR Channel A)
Delete RP51            (PPS Door Open Annunciator 56B46)
RO        VERIFY the Trip Channel Bypassed Annunciator alarm.
* 56A29 - PPS CHANNEL 1 TRIP BYPASSED.
SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc


56B06 - PPS CHANNEL 1 TROUBLE 56C01 - CPC CHANNEL 1 SENSOR FAILURE
Appendix D                                        Operator Action                            Form ES-D-2 Operating Test :        NRC        Scenario #    3       Event #            2       Page 6    of  17 Event
+30 sec RO/BOP REFER to Annunciator Response Procedures.
RO RECOGNIZE CPC Channel 1 sensor failure and INFORM the CRS  SO23-13-18, Reactor Protection System Failure entry required.
CRS DIRECT performance of SO23-13-18, Reactor Protection System Failure /
Loss of Vital Bus.
RO REFER to SO23-3-2.13, Core Protection / Control Element Assembly Calculator Operation and DETERMINE Reactor Coolant Pump P-002 has a failed speed sensor.
CRS REFER to Attachment 5 and DETERMINE Functional Unit affected is


Reactor Coolant Pump P-002 Speed.
== Description:==
RO PLACE the affected Functional Unit in BYPASS per SO23-3-2.12, Section for Bypass Operation of Trip Channels.
Reactor Coolant Pump Speed Sensor Failure Time          Position                              Applicants Actions or Behavior CONFIRM failure does NOT affect RPS/ESFAS Matrix Logic, RPS/ESFAS CRS      Initiation Logic, RTCBs, RPS/ESFAS Manual Trip, or ESFAS Actuation Logic.
RO VERIFY that the same bistable is not in BYPASS on any other Channel.
CRS      CONFIRM failure does NOT affect the Feedwater Digital Control System.
M.O. Cue: When directed, EXECUTE the following Remote Functions: RP51 = OPEN  (PPS Door Open Annunciator 56B46) RP52C = BYPASS (High LPD Channel A) RP52D = BYPASS (Low DNBR Channel A)
+10 min          CRS      EVALUATE Technical Specifications.
Delete RP51  (PPS Door Open Annunciator 56B46)
* 3.3.1.A, Reactor Protection System Instrumentation - Operating.
RO VERIFY the Trip Channel Bypassed Annunciator alarm.
* CONDITION A - One or more Functions with one automatic RPS trip channel inoperable.
56A29 - PPS CHANNEL 1 TRIP BYPASSED.  
* ACTION A.1 - Place Channel in bypass or trip within one (1) hour.
When the RPS Channel 1 is bypassed, or at Lead Evaluators discretion, PROCEED to Event 3.
SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 2 Page 6 of 17 Event
Appendix D                                         Operator Action                           Form ES-D-2 Operating Test :       NRC       Scenario #       3     Event #             3        Page 7    of 17 Event


== Description:==
== Description:==
Reactor Coolant Pump Speed Sensor Failure Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc CRS CONFIRM failure does NOT affect RPS/ESFAS Matrix Logic, RPS/ESFAS Initiation Logic, RTCBs, RPS/ESFAS Manual Trip, or ESFAS Actuation
VCT Level Transmitter Fails Low Time         Position                             Applicants Actions or Behavior Machine Operator:          When directed, EXECUTE Event 3.
CV16B, LT-0227, VCT Level Transmitter fails low.
Indications Available:
58A05 - VCT LEVEL LO/LO VCT Level Indicator LI-0227A lowering (on Plant Computer System)
VCT Outlet Valve LC-0227B closes RWST to Charging Pump Suction Valve LV-0227C opens
  +1 min          RO        REFER to Annunciator Response Procedures.
DETERMINE that VCT suction has shifted from VCT to RWST and INFORM RO CRS that ARP SO23-15.58.A05 entry required.
DIRECT performance of CRS that ARP SO23-15.58.A, Annunciator 58A05 -
CRS VCT LEVEL LO / LO.
RO        CHECK VCT Level indicator LI-0226 and determine that level is normal.
RO        RECOGNIZE that VCT level indicator LI-0227 has failed low.
RO        PLACE LV-0227B, VCT Outlet Valve in MANUAL and OPEN.
BOP      ADJUST Turbine load as necessary to restore TCOLD per SO23-5-1.7.
DIRECT performance of SO23-3-2.2, Makeup Operations to ensure proper CRS CVCS alignment is achieved.
+10 min          CRS      REQUEST I&C assistance.
When plant conditions are stable, or at Lead Evaluators discretion, PROCEED to Event 4.
SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc


Logic. CRS CONFIRM failure does NOT affect the Feedwater Digital Control System.
Appendix D                                         Operator Action                           Form ES-D-2 Operating Test :       NRC         Scenario #   3       Event #           4        Page 8    of 17 Event
+10 min CRS EVALUATE Technical Specifications.
3.3.1.A, Reactor Protection System Instrumentation - Operating.
CONDITION A - One or more Functions with one automatic RPS trip channel inoperable. ACTION A.1 - Place Channel in bypass or trip within one (1) hour.
When the RPS Channel 1 is bypassed, or at Lead Evaluator's discretion, PROCEED to Event 3.
 
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 3 Page 7 of 17 Event


== Description:==
== Description:==
VCT Level Transmitter Fails Low Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc Machine Operator:   When directed, EXECUTE Event 3.
Loss of Bus 2B04 Time         Position                             Applicants Actions or Behavior Machine Operator:         When directed, EXECUTE Event 4.
CV16B, LT-0227, VCT Level Transmitter fails low.
                          - ED06D, Loss of Bus 2B04.
Indications Available
Indications Available:
: 58A05 - VCT LEVEL LO/LO VCT Level Indicator LI-0227A lowering (on Plant Computer System)
63B06 - 2B04 VOLTAGE LO 63B55 - LOAD CENTER XFMR FDR 2A0420 OC 63A52 - 2D1 CHARGER TROUBLE 63A54 - 2D3 CHARGER TROUBLE Numerous Train A ECCS INOPERABLE alarms
VCT Outlet Valve LC-0227B closes 
+30 secs      RO/BOP      REFER to Annunciator Response Procedures.
RECOGNIZE low 2B04 Bus voltage and INFORM the CRS AOI SO23-13-26 RO/BOP entry required.
CRS        DIRECT performance of AOI SO23-13-26, Loss of Power to an AC Bus.
RO        START Charging Pump P-192 as required.
DISPATCH an operator to VERIFY loss of the 1E 480 V Bus is NOT due to a CRS fire in the 1E Switchgear Room.
RO/BOP      DETERMINE overcurrent annunciators are alarming on Bus 2B04.
DIRECT initiation of SO23-6-9, 6.9 kV, 4 kV and 480V Bus and Feeder CRS Faults to return Bus 2B04 to service.
CRS        DIRECT initiation of Equipment Actions for Loss of the 1E 4 kV Bus 2B04.
  +5 min          BOP        PLACE G002 Diesel Generator in MAINTENANCE LOCKOUT.
Within 1 hour, DIRECT performance of SO23-3-3.23, Attachment for AC CRS Sources Verification for both Units.
SELECT HS-0210, Makeup Mode Selector Switch to MANUAL and PLACE a RO Caution Tag at the switch to prevent inadvertent dilution.
SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc


RWST to Charging Pump Suction Valve LV-0227C opens
Appendix D                                       Operator Action                           Form ES-D-2 Operating Test :       NRC       Scenario #   3       Event #             4       Page 9    of 17 Event
+1 min RO REFER to Annunciator Response Procedures.
RO DETERMINE that VCT suction has shifted from VCT to RWST and INFORM CRS that ARP SO23-15.58.A05 entry required.
CRS DIRECT performance of CRS that ARP SO23-15.58.A, Annunciator 58A05 - VCT LEVEL LO / LO.
RO CHECK VCT Level indicator LI-0226 and determine that level is normal.
RO RECOGNIZE that VCT level indicator LI-0227 has failed low.
RO PLACE LV-0227B, VCT Outlet Valve in MANUAL and OPEN.
BOP ADJUST Turbine load as necessary to restore T COLD per SO23-5-1.7.
CRS DIRECT performance of SO23-3-2.2, Makeup Operations to ensure proper CVCS alignment is achieved.
+10 min CRS REQUEST I&C assistance.
When plant conditions are stable, or at Lead Evaluator's discretion, PROCEED to Event 4.
 
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 4 Page 8 of 17 Event


== Description:==
== Description:==
Loss of Bus 2B04 Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc Machine Operator: When directed, EXECUTE Event 4. - ED06D, Loss of Bus 2B04.
Loss of Bus 2B04 Time         Position                             Applicants Actions or Behavior CRS      EVALUATE Technical Specifications.
Indications Available
* LCO 3.8.4.A, DC Sources - Operating.
: 63B06 - 2B04 VOLTAGE LO 63B55 - LOAD CENTER XFMR FDR 2A0420 OC 63A52 - 2D1 CHARGER TROUBLE 63A54 - 2D3 CHARGER TROUBLE Numerous Train A ECCS INOPERABLE alarms
* CONDITION A - One battery or associated control equipment or cabling INOPERABLE.
+30 secs RO/BOP REFER to Annunciator Response Procedures.
* ACTION A.1 - Restore DC electrical power subsystem to OPERABLE status within two hours.
RO/BOP RECOGNIZE low 2B04 Bus voltage and INFORM the CRS AOI SO23-13-26 entry required.
CRS      VERIFY Channel A DNBR and LPD trips bypassed.
CRS DIRECT performance of AOI SO23-13-26, Loss of Power to an AC Bus.
RO     VERIFY the Trip Channel Bypassed Annunciator alarms.
RO START Charging Pump P-192 as required.
* 56A29 - PPS CHANNEL 1 TRIP BYPASSED DIRECT setting CEAC 2 INOP Flags in all CPCs by changing each CPC CRS Addressable Constant Point ID 062 to 2.
CRS DISPATCH an operator to VERIFY loss of the 1E 480 V Bus is NOT due to a fire in the 1E Switchgear Room.
CRS      DIRECT aligning Charging Pump P191 to Train B.
RO/BOP DETERMINE overcurrent annunciators are alarming on Bus 2B04.
M.O. Cue:        If asked, REPORT Unit 3 Train B Component Cooling Water is operating.
CRS DIRECT initiation of SO23-6-9, 6.9 kV, 4 kV and 480V Bus and Feeder Faults to return Bus 2B04 to service.
RO/BOP     START a Train B Containment Air Dome Circulator.
CRS DIRECT initiation of Equipment Actions for Loss of the 1E 4 kV Bus 2B04.
CRS     DIRECT initiating Train B CRIS.
+5 min BOP PLACE G002 Diesel Generator in MAINTENANCE LOCKOUT.
+15 min           BOP     INITIATE Train B CRIS.
CRS Within 1 hour, DIRECT performance of SO23-3-3.23, Attachment for AC Sources Verification for both Units.
When Technical Specifications have been addressed, or at Lead Evaluators discretion, PROCEED to Event 5.
RO SELECT HS-0210, Makeup Mode Selector Switch to MANUAL and PLACE a
SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc


Caution Tag at the switch to prevent inadvertent dilution.
Appendix D                                       Operator Action                             Form ES-D-2 Operating Test :       NRC       Scenario #     3     Event #             5        Page 10    of 17 Event
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 4 Page 9 of 17 Event


== Description:==
== Description:==
Loss of Bus 2B04 Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc CRS EVALUATE Technical Specifications.
Main Feedwater Pump Trip Time         Position                             Applicants Actions or Behavior Machine Operator:          When directed, EXECUTE Event 5.
LCO 3.8.4.A, DC Sources - Operating.
                            - FW LP, Main Feedwater Pump trip.
CONDITION A - One battery or associated control equipment or cabling INOPERABLE. ACTION A.1 - Restore DC electrical power subsystem to OPERABLE status within two hours.
Indications Available:
CRS VERIFY Channel A DNBR and LPD trips bypassed.
53B03 - MFWP TURBINE K005 TRIP
RO VERIFY the Trip Channel Bypassed Annunciator alarms.
+10 sec          BOP        REFER to Annunciator Response Procedures.
56A29 - PPS CHANNEL 1 TRIP BYPASSED CRS DIRECT setting CEAC 2 INOP Flags in all CPCs by changing each CPC Addressable Constant Point ID 062 to 2.
BOP        DETERMINE only available Main Feedwater Pump has tripped.
CRS DIRECT aligning Charging Pump P191 to Train B.
CRS         DIRECT a Reactor and Turbine trip.
M.O. Cue: If asked, REPORT Unit 3 Train B Component Cooling Water is operating.
Examiner Note:           The Primary Side Reactor Trip pushbuttons have been disabled and the Reactor will be tripped by the BOP.
RO/BOP START a Train B Containment Air Dome Circulator.
  +1 min         BOP         Manually TRIP the Reactor and Turbine.
CRS DIRECT initiating Train B CRIS.  
When Reactor has been tripped, or at Lead Evaluators discretion, PROCEED to Events 6, 7, and 8.
+15 min BOP INITIATE Train B CRIS.
SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc
When Technical Specifications have been addressed, or at Lead Evaluator's discretion, PROCEED to Event 5.  


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 5 Page 10 of 17 Event
Appendix D                                         Operator Action                               Form ES-D-2 Operating Test :       NRC         Scenario #     3       Event #       6, 7, & 8      Page 11    of 17 Event


== Description:==
== Description:==
Main Feedwater Pump Trip Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc Machine Operator: When directed, EXECUTE Event 5. - FW LP, Main Feedwater Pump trip.
Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time         Position                               Applicants Actions or Behavior Machine Operator:         When directed, EXECUTE Events 6, 7, and 8.
Indications Available
                          - MS04B, ESDE on SG E089 downstream of MSIV @ 30% on 300 second ramp.
: 53B03 - MFWP TURBINE K005 TRIP
                          - MSIS LP, Main Steam Isolation Signal fails to actuate.
+10 sec BOP REFER to Annunciator Response Procedures.
                          - RD1402 & RD1502, Control Element Assemblies #14 & #15 fail to insert.
BOP DETERMINE only available Main Feedwater Pump has tripped.
Indications Available:
CRS DIRECT a Reactor and Turbine trip.
Normal post-trip alarms Steam Generator E089 pressure lowering RCS temperature lowering CRS        DIRECT performance of SO23-12-1, Standard Post Trip Actions.
Examiner Note: The Primary Side Reactor Trip pushbuttons have been disabled and the Reactor will be tripped by the BOP.
RO        VERIFY Reactor Trip:
  +1 min BOP Manually TRIP the Reactor and Turbine.
* VERIFY Reactor Trip Circuit Breakers (8) open.
When Reactor has been tripped, or at Lead Evaluator
* VERIFY Reactor Power lowering and Startup Rate negative.
's discretion, PROCEED to Events 6, 7, and 8.
* DETERMINE two (2) full length CEAs NOT fully inserted.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 6, 7, & 8 Page 11 of 17 Event
With failure of 2 or more Full Length CEAs to fully insert, perform an CRITICAL TASK emergency boration (or some other alignment which adds boric acid from STATEMENT either the BAMU Tanks or RWST at 40 gpm or more).
CRITICAL TASK RO            * [RNO] COMMENCE emergency boration at greater than 40 gpm.
CRS        VERIFY Reactivity Control criteria satisfied.
BOP       VERIFY Turbine Trip:
* VERIFY Main Turbine tripped.
* HP and LP Stop and Governor Valves closed.
* VERIFY both Unit Output Breakers open.
* VERIFY Main Turbine speed < 2000 RPM or lowering.
CRS        INITIATE Administrative Actions:
* ANNOUNCE Reactor trip via PA system.
* INITIATE Attachment 4, Worksheet.
SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc
 
Appendix D                                           Operator Action                             Form ES-D-2 Operating Test :       NRC         Scenario #       3     Event #         6, 7, & 8     Page 12    of 17 Event


== Description:==
== Description:==
Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc Machine Operator: When directed, EXECUTE Events 6, 7, and 8. - MS04B, ESDE on SG E089 downstream of MSIV @ 30% on 300 second ramp.  
Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time         Position                               Applicants Actions or Behavior
- MSIS LP, Main Steam Isolation Signal fails to actuate.  
* INITIATE Attachment 5, Administrative Actions.
- RD1402 & RD1502, Control Element Assemblies #14 & #15 fail to insert.
BOP      VERIFY Vital Auxiliaries criteria satisfied:
Indications Available
* VERIFY both 1E 4 kV Buses A04 and A06 energized.
: Normal post-trip alarms Steam Generator E089 pressure lowering RCS temperature lowering CRS DIRECT performance of SO23-12-1, Standard Post Trip Actions.
* DETERMINE one 1E 480 V Bus B04 deenergized.
RO VERIFY Reactor Trip:
                                  *    [RNO] INITIATE Attachment 2, Diesel Generator Failure Follow-Up Actions for Bus 2B04.
VERIFY Reactor Trip Circuit Breakers (8) open.
* VERIFY all 1E DC Buses energized.
VERIFY Reactor Power lowering and Startup Rate negative.
* VERIFY all Non-1E 4 kV Buses energized.
DETERMINE two (2) full length CEAs NOT fully inserted.
* VERIFY one CCW Train operating AND aligned to Non-Critical Loop and Letdown Heat Exchanger.
CRITICAL TASK STATEMENT With failure of 2 or more Full Length CEAs to fully insert, perform an emergency boration (or some other alignment which adds boric acid from either the BAMU Tanks or RWST at 40 gpm or more).
M.O. Cue:        If directed to check Main Steam Safety Valve status, REPORT that all Safety Valves appear to be seated, with no steam coming from the MSIV roof, however, the Turbine Building is filling with steam.
CRITICAL TASK RO [RNO] COMMENCE emergency boration at greater than 40 gpm.
RO       DETERMINE RCS Inventory Control criteria NOT satisfied:
CRS VERIFY Reactivity Control criteria satisfied.
* DETERMINE PZR level NOT between 10% and 70% AND NOT trending to between 30% and 60%.
BOP VERIFY Turbine Trip:
                                *    [RNO] DETERMINE PZR Level Control System is NOT restoring PZR level.
VERIFY Main Turbine tripped.
* VERIFY Core Exit Saturation Margin  20&deg;F:
HP and LP Stop and Governor Valves closed.
* QSPDS page 611.
VERIFY both Unit Output Breakers open.
* CFMS page 311.
VERIFY Main Turbine speed < 2000 RPM or lowering.
RO      DETERMINE RCS Pressure Control criteria is NOT satisfied:
CRS INITIATE Administrative Actions:
* DETERMINE Pressurizer pressure is less than 1740 PSIA and lowering.
ANNOUNCE Reactor trip via PA system.
                                *    [RNO] DETERMINE PZR Pressure Control System is NOT restoring PZR pressure.
INITIATE Attachment 4, Worksheet.
                                *    [RNO] ENSURE Normal and Aux Spray valves closed.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 6, 7, & 8 Page 12 of 17 Event
                                *    [RNO] ENSURE SIAS, CCAS, and CRIS actuated.
                                *    [RNO] If PZR pressure is < 1430 PSIA, then ENSURE at least one RCP in each loop stopped.
RO                        *  [RNO] STOP one RCP in each loop.
SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc


== Description:==
Appendix D                                         Operator Action                               Form ES-D-2 Operating Test :       NRC       Scenario #     3       Event #       6, 7, & 8       Page 13   of 17 Event
Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc INITIATE Attachment 5, Administrative Actions.
BOP VERIFY Vital Auxiliaries criteria satisfied:
VERIFY both 1E 4 kV Buses A04 and A06 energized.
DETERMINE one 1E 480 V Bus B04 deenergized.
[RNO] INITIATE Attachment 2, Diesel Generator Failure Follow-Up Actions for Bus 2B04.
VERIFY all 1E DC Buses energized.
VERIFY all Non-1E 4 kV Buses energized.
VERIFY one CCW Train operating AND aligned to Non-Critical Loop and Letdown Heat Exchanger.
M.O. Cue:  If directed to check Main Steam Safety Valve status, REPORT that all Safety Valves appear to be seated, with no steam coming from the MSIV roof, however, the Turbine Building is filling with steam.
RO DETERMINE RCS Inventory Control criteria NOT satisfied:
DETERMINE PZR level NOT between 10% and 70% AND NOT trending to between 30% and 60%.
[RNO]  DETERMINE PZR Level Control System is NOT restoring PZR level.
VERIFY Core Exit Saturation Margin  20&deg;F:    QSPDS page 611.
CFMS page 311.
RO DETERMINE RCS Pressure Control criteria is NOT satisfied:
DETERMINE Pressurizer pressure is less than 1740 PSIA and lowering.
[RNO] DETERMINE PZR Pressure Control System is NOT restoring PZR pressure.
[RNO] ENSURE Normal and Aux Spray valves closed.
[RNO] ENSURE SIAS, CCAS, and CRIS actuated.
[RNO] If PZR pressure is < 1430 PSIA, then ENSURE at least one RCP in each loop stopped.
RO  [RNO] STOP one RCP in each loop.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 6, 7, & 8 Page 13 of 17 Event


== Description:==
== Description:==
Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc
Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time         Position                             Applicants Actions or Behavior
[RNO] If RCP NPSH requirements NOT satisfied, then ENSURE all RCPs stopped.
                                *  [RNO] If RCP NPSH requirements NOT satisfied, then ENSURE all RCPs stopped.
RO VERIFY Core Heat Removal criteria satisfied:
RO       VERIFY Core Heat Removal criteria satisfied:
VERIFY at least one RCP operating.
* VERIFY at least one RCP operating.
VERIFY core loop T is less than 10&#xba;F.
* VERIFY core loop T is less than 10&#xba;F.
VERIFY Core Exit Saturation Margin  20&deg;F. QSPDS page 611.
* VERIFY Core Exit Saturation Margin  20&deg;F.
CFMS page 311.
* QSPDS page 611.
BOP DETERMINE RCS Heat Removal criteria NOT satisfied:
* CFMS page 311.
VERIFY at least one SGs level between 21% and 80% NR and Auxiliary Feedwater available.
BOP       DETERMINE RCS Heat Removal criteria NOT satisfied:
DETERMINE T C less than 545&deg;F and NOT controlled.
* VERIFY at least one SGs level between 21% and 80% NR and Auxiliary Feedwater available.
DETERMINE heat removal NOT adequate:
* DETERMINE TC less than 545&deg;F and NOT controlled.
[RNO] T cold less than 545&deg;F.
* DETERMINE heat removal NOT adequate:
[RNO] ENSURE SBCS valves closed.
                                *  [RNO] Tcold less than 545&deg;F.
[RNO] ENSURE ADVs closed.
                                *  [RNO] ENSURE SBCS valves closed.
[RNO] ENSURE SG Blowdown valves closed.
                                *  [RNO] ENSURE ADVs closed.
E-088 - HV-4054 E-089 - HV-4053
                                *  [RNO] ENSURE SG Blowdown valves closed.
[RNO] ENSURE Main Steam to Reheater Valves closed:
* E-088 - HV-4054             E-089 - HV-4053
                                *  [RNO] ENSURE Main Steam to Reheater Valves closed:
HV-2703 or HV-2704, HV-2721, HV-2751.
HV-2703 or HV-2704, HV-2721, HV-2751.
DETERMINE SG pressures < 740 PSIA.
* DETERMINE SG pressures < 740 PSIA.
DETERMINE MSIS NOT actuated.
* DETERMINE MSIS NOT actuated.
CRITICAL TASK STATEMENT Actions are taken to isolate the SGs prior to either SG blowing dry. These actions may include either manual actuation of the MSIS signal, or manual closure of MSIS actuated components.
Actions are taken to isolate the SGs prior to either SG blowing dry. These CRITICAL TASK actions may include either manual actuation of the MSIS signal, or manual STATEMENT closure of MSIS actuated components.
CRITICAL TASK BOP Manually INITIATE MSIS.  
CRITICAL TASK BOP       Manually INITIATE MSIS.
SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 6, 7, & 8 Page 14 of 17 Event
Appendix D                                         Operator Action                               Form ES-D-2 Operating Test :       NRC       Scenario #     3       Event #         6, 7, & 8       Page 14   of 17 Event


== Description:==
== Description:==
Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc RO VERIFY Containment Isolation criteria satisfied:
Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time         Position                             Applicants Actions or Behavior RO       VERIFY Containment Isolation criteria satisfied:
VERIFY Containment pressure <1.5 PSIG.
* VERIFY Containment pressure <1.5 PSIG.
VERIFY Containment Area Radiation Monitors energized AND NOT alarming or trending to alarm.
* VERIFY Containment Area Radiation Monitors energized AND NOT alarming or trending to alarm.
VERIFY Secondary Plant Radiation Monitors energized AND NOT alarming or trending to alarm.
* VERIFY Secondary Plant Radiation Monitors energized AND NOT alarming or trending to alarm.
RO VERIFY Containment Temperature and Pressure criteria satisfied:
RO       VERIFY Containment Temperature and Pressure criteria satisfied:
VERIFY Containment average temperature < 120&deg;F.
* VERIFY Containment average temperature < 120&deg;F.
VERIFY Containment pressure < 1.5 PSIG.  
* VERIFY Containment pressure < 1.5 PSIG.
  +15 min CRS DIAGNOSE event in progress:
  +15 min         CRS       DIAGNOSE event in progress:
DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.
* DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.
[RNO] COMPLETE Attachment 1, Recovery Diagnostics.
                                *  [RNO] COMPLETE Attachment 1, Recovery Diagnostics.
[RNO] DIAGNOSE event as ESDE outside Containment.
                                *  [RNO] DIAGNOSE event as ESDE outside Containment.
DETERMINE that Reactor Trip Recovery is NOT diagnosed.
* DETERMINE that Reactor Trip Recovery is NOT diagnosed.
[RNO] ENSURE at least one RCP stopped in each loop.
                                *  [RNO] ENSURE at least one RCP stopped in each loop.
DIRECT initiating Steps 12 through 15.
* DIRECT initiating Steps 12 through 15.
BOP INITIATE Steps 12 through 15.
BOP       INITIATE Steps 12 through 15.
CRS DIRECT performance of EOI SO23-12-5, Excess Steam Demand Event.
CRS       DIRECT performance of EOI SO23-12-5, Excess Steam Demand Event.
RECORD time of EOI entry __________.
* RECORD time of EOI entry __________.
CRS VERIFY ESDE diagnosis:
CRS       VERIFY ESDE diagnosis:
INITIATE SO23-12-10, Safety Function Status Checks.
* INITIATE SO23-12-10, Safety Function Status Checks.
INITIATE Foldout Page.
* INITIATE Foldout Page.
DIRECT performance of FS-7, Verify SI Throttle/Stop Criteria.
* DIRECT performance of FS-7, Verify SI Throttle/Stop Criteria.
DIRECT performance of Attachment 22, Non-Qualified Loads Restoration.
* DIRECT performance of Attachment 22, Non-Qualified Loads Restoration.
DIRECT performance of FS-30, Stabilize RCS Temperature.
* DIRECT performance of FS-30, Stabilize RCS Temperature.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 6, 7, & 8 Page 15 of 17 Event
SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc
 
Appendix D                                       Operator Action                                 Form ES-D-2 Operating Test :       NRC         Scenario #   3     Event #         6, 7, & 8       Page 15   of 17 Event


== Description:==
== Description:==
Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc DIRECT performance of Attachment 28, Isolation of SG with ESDE. VERIFY ESDE diagnosis using Figure 1, Break Identification Chart.
Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time         Position                             Applicants Actions or Behavior
INITIATE sampling of both Steam Generators for radioactivity and boron. M.O. Cue: If directed to sample SGs, WAIT 10 minutes and then REPORT that E088 and E089 both have activity near background, and normal boron levels. If the SG sample valves are closed, REPORT that you are unable to establish sample flow.
* DIRECT performance of Attachment 28, Isolation of SG with ESDE.
CRS INITIATE Administrative Actions:
* VERIFY ESDE diagnosis using Figure 1, Break Identification Chart.
NOTIFY Shift Manger/Operations Leader of entry into SO23-12-5, Excess Steam Demand Event.
* INITIATE sampling of both Steam Generators for radioactivity and boron.
ENSURE Emergency Plan is initiated.
M.O. Cue:         If directed to sample SGs, WAIT 10 minutes and then REPORT that E088 and E089 both have activity near background, and normal boron levels. If the SG sample valves are closed, REPORT that you are unable to establish sample flow.
IMPLEMENT Placekeeper.
CRS       INITIATE Administrative Actions:
RO VERIFY ESF actuation.
* NOTIFY Shift Manger/Operations Leader of entry into SO23-12-5, Excess Steam Demand Event.
VERIFY SIAS actuation required.
* ENSURE Emergency Plan is initiated.
PZR pressure less than SIAS setpoint.
* IMPLEMENT Placekeeper.
ENSURE the following actuated:
RO       VERIFY ESF actuation.
SIAS / CCAS / CRIS /MSIS CRS RECORD time of SIAS __________.
* VERIFY SIAS actuation required.
BOP STOP Train B EDG (SIAS Override STOP).
* PZR pressure less than SIAS setpoint.
BOP PERFORM EOI SO23-12-11, Attachment 22, Non-Qualified Load Restoration.
* ENSURE the following actuated:
M.O. Cue: When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored non-qualified loads.  
* SIAS / CCAS / CRIS /MSIS CRS       RECORD time of SIAS __________.
BOP       STOP Train B EDG (SIAS Override STOP).
PERFORM EOI SO23-12-11, Attachment 22, Non-Qualified Load BOP Restoration.
M.O. Cue:         When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored non-qualified loads.
SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 6, 7, & 8 Page 16 of 17 Event
Appendix D                                       Operator Action                                 Form ES-D-2 Operating Test :       NRC       Scenario #     3     Event #         6, 7, & 8       Page 16   of 17 Event


== Description:==
== Description:==
Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc BOP VERIFY MSIS actuation required and ENSURE MSIS actuated.
Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time         Position                             Applicants Actions or Behavior BOP       VERIFY MSIS actuation required and ENSURE MSIS actuated.
SG pressure < 740 PSIA.
* SG pressure < 740 PSIA.
RO DETERMINE CIAS actuation NOT required.
RO       DETERMINE CIAS actuation NOT required.
RO VERIFY SIAS actuated.
RO       VERIFY SIAS actuated.
RO ESTABLISH Optimum SI Alignment:
RO       ESTABLISH Optimum SI Alignment:
ESTABLISH two train operation:
* ESTABLISH two train operation:
All available Charging Pumps operating (P192).
* All available Charging Pumps operating (P192).
One HPSI and one LPSI per Train B operating.
* One HPSI and one LPSI per Train B operating.
Train B Cold Leg flow paths aligned.
* Train B Cold Leg flow paths aligned.
VERIFY SI flow required:
* VERIFY SI flow required:
SI flow indicated OR RCS pressure >1250 psia. OR   VERIFY FS-7, Verify SI Throttle/Stop criteria satisfied.
* SI flow indicated OR RCS pressure >1250 psia.
BOP DETERMINE MSIVs and MSIV Bypasses CLOSED.
OR
CRS PREVENT Pressurize Thermal Shock.
* VERIFY FS-7, Verify SI Throttle/Stop criteria satisfied.
DIRECT performance of FS-30, Stabilize RCS Temperature.
BOP       DETERMINE MSIVs and MSIV Bypasses CLOSED.
DIRECT performance of VERIFY FS-7, Verify SI Throttle/Stop Criteria.
CRS       PREVENT Pressurize Thermal Shock.
RO VERIFY RCP NPSH requirements of EOI SO23-12-11,   9.
* DIRECT performance of FS-30, Stabilize RCS Temperature.
CRS VERIFY ESDE isolated.
* DIRECT performance of VERIFY FS-7, Verify SI Throttle/Stop Criteria.
BOP VERIFY both Steam Generator WR levels > 10%.
VERIFY RCP NPSH requirements of EOI SO23-12-11, RO Attachment 29.
BOP VERIFY both Steam Generator pressures rising.
CRS       VERIFY ESDE isolated.
RO VERIFY RCS Tcold in each loop rising.  
BOP
* VERIFY both Steam Generator WR levels > 10%.
BOP
* VERIFY both Steam Generator pressures rising.
RO
* VERIFY RCS Tcold in each loop rising.
SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 6, 7, & 8 Page 17 of 17 Event
Appendix D                                       Operator Action                                 Form ES-D-2 Operating Test :       NRC     Scenario #     3       Event #         6, 7, & 8       Page 17   of 17 Event


== Description:==
== Description:==
Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc BOP VERIFY least affected SG level > 22% narrow range.  
Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time         Position                             Applicants Actions or Behavior BOP       VERIFY least affected SG level > 22% narrow range.
+30 min BOP OPERATE ADV to stabilize RCS temperature.
+30 min           BOP       OPERATE ADV to stabilize RCS temperature.
When ESDE is verified isolated, TERMINATE the scenario.  
When ESDE is verified isolated, TERMINATE the scenario.
SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc


Appendix D Scenario Outline Form ES-D-1 SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc Facility: SONGS 2 and 3 Scenario No.: 4 Op Test No.: October 2009 NRC Examiners:   Operators:
Appendix D                                   Scenario Outline                                       Form ES-D-1 Facility:         SONGS 2 and 3                     Scenario No.:         4   Op Test No.:   October 2009 NRC Examiners:                                                   Operators:
Initial Conditions: Reactor Critical at 2x10
Initial Conditions:
-3% power MOC - RCS Boron is 1466 ppm (by sample). Train B Component Cooling Water Pump (P-026) in service. Channel X Pressurizer Level and Pressure Control in service. Fire Computer is OOS. Turnover: Power increase in progress to ~ 2% power.
* Reactor Critical at 2x10-3% power MOC - RCS Boron is 1466 ppm (by sample).
Critical Tasks: Restore Component Cooling Water flow due to Train B leakage.
* Train B Component Cooling Water Pump (P-026) in service.
Reduce Reactor Coolant System Thot to less than 530&deg;F (SGTR).
* Channel X Pressurizer Level and Pressure Control in service.
Isolate the most affected Steam Generator (SGTR). Event No. Malf. No. Event Type* Event Description 1 +15 min  R (RO) N (BOP, CRS) Rod withdrawal and power increase in progress to ~2% power.
* Fire Computer is OOS.
2 +25 min CVCS LP I (RO, CRS)  
Turnover:             Power increase in progress to ~ 2% power.
 
Critical Tasks:
Letdown Heat Exchanger Outlet Temperature Instrument (TI-0224) fails high. TV-0224A and TV-0224B fail to reposition.
* Restore Component Cooling Water flow due to Train B leakage.
3 +35 min CC05B C (BOP, CRS) TS (CRS) Train B Component Cooling Water Heat Exchanger (E-002) tube  
* Reduce Reactor Coolant System Thot to less than 530&deg;F (SGTR).
 
* Isolate the most affected Steam Generator (SGTR).
leak. 4 +45 min RX08 C (BOP, CRS) Steam Bypass Control Valves close. Transfer SBCS Master Controller (PIC-8431) to Local-Manual to open valves.
Event No.     Malf. No.       Event Type*                                 Event Description 1                   R (RO)                 Rod withdrawal and power increase in progress to ~2% power.
5 +50 min SG06B C (RO, CRS)
+15 min                   N (BOP, CRS) 2      CVCS LP     I (RO, CRS)           Letdown Heat Exchanger Outlet Temperature Instrument
TS (CRS) Steam Generator Tube Leak (E-089) at 50 gpm.  
+25 min                                          (TI-0224) fails high. TV-0224A and TV-0224B fail to reposition.
 
3       CC05B       C (BOP, CRS)           Train B Component Cooling Water Heat Exchanger (E-002) tube
6 +50 min SG06B M (RO, BOP, CRS)
+35 min                  TS (CRS)              leak.
4       RX08         C (BOP, CRS)           Steam Bypass Control Valves close. Transfer SBCS Master
+45 min                                          Controller (PIC-8431) to Local-Manual to open valves.
5       SG06B       C (RO, CRS)           Steam Generator Tube Leak (E-089) at 50 gpm.
+50 min                   TS (CRS) 6      SG06B       M (RO, BOP, CRS) Steam Generator Tube Rupture (E-089) at 300 gpm upon Unit trip.
+50 min 7      CCAS LP      I (RO)                Containment Cooling Actuation Signal fails to actuate.
+60 min
    *    (N)ormal,  (R)eactivity,  (I)nstrument,  (C)omponent,      (M)ajor, (TS) Technical Specifications SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc


Steam Generator Tube Rupture (E-089) at 300 gpm upon Unit trip.
Appendix D                               Scenario Outline                                   Form ES-D-1 SCENARIO  
7 +60 min CCAS LP I (RO) Containment Cooling Actuation Signal fails to actuate. * (N)ormal,    (R)eactivity,    (I)nstrument,    (C)omponent,    (M)ajor,  (TS) Technical Specifications Appendix D Scenario Outline Form ES-D-1 SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc SCENARIO  


==SUMMARY==
==SUMMARY==
NRC #4 The crew will assume the watch with the Reactor critical at ~2x10
NRC #4 The crew will assume the watch with the Reactor critical at ~2x10-3% power. The crew will raise power using CEA withdrawal per Operating Instruction (OI) SO23-5-1.3.1, Plant Startup from Hot Standby to Minimum Load.
-3% power. The crew will raise power using CEA withdrawal per Operating Instruction (OI) SO23-5-1.3.1, Plant Startup from Hot Standby to Minimum Load.
 
The next event is a high failure of a Letdown temperature instrument. The crew will respond per the Annunciator Response Procedures (ARP) and perform actions to isolate the Boronometer and bypass the Ion Exchanger Demineralizers.
The next event is a high failure of a Letdown temperature instrument. The crew will respond per the Annunciator Response Procedures (ARP) and perform actions to isolate the Boronometer and bypass the Ion Exchanger Demineralizers.
When Letdown conditions are normal, a tube leak will develop on the Train B Component Cooling Water Heat Exchanger. The crew will respond per Abnormal Operating Instruction (AOI) SO23-13-7, Loss of Component Cooling Water/Salt Water Cooling. Crew actions include transferring to the Train A Component Cooling Water System as well is attempting to isolate Train B leakage. The CRS will evaluate Technical Specifications.
When Letdown conditions are normal, a tube leak will develop on the Train B Component Cooling Water Heat Exchanger. The crew will respond per Abnormal Operating Instruction (AOI) SO23-13-7, Loss of Component Cooling Water/Salt Water Cooling. Crew actions include transferring to the Train A Component Cooling Water System as well is attempting to isolate Train B leakage. The CRS will evaluate Technical Specifications.
When CCW flow is restored, the Steam Bypass Control System (SBCS) Valves will close. Crew actions are per OI SO23-3-2.18, Steam Bypass System Operation and include transferring the SBCS Master Controller to Local-Manual control or operating individual SBCS Valves and restoring Reactor Coolant System temperature and Reactor power level to normal.
When CCW flow is restored, the Steam Bypass Control System (SBCS) Valves will close. Crew actions are per OI SO23-3-2.18, Steam Bypass System Operation and include transferring the SBCS Master Controller to Local-Manual control or operating individual SBCS Valves and restoring Reactor Coolant System temperature and Reactor power level to normal.
When plant conditions are stable, a Steam Generator tube leak will occur. The crew will enter AOI SO23-13-4, RCS Leak and take actions to minimize tube leakage. The size of the leak will require an immediate plant trip and at that time the leak will escalate to a rupture. The crew will enter Emergency Operating Instruction (EOI) SO23-12-1, Standard Post Trip Actions and transition to EOI SO23-12-5, Steam Generator Tube Rupture.
When plant conditions are stable, a Steam Generator tube leak will occur. The crew will enter AOI SO23-13-4, RCS Leak and take actions to minimize tube leakage. The size of the leak will require an immediate plant trip and at that time the leak will escalate to a rupture. The crew will enter Emergency Operating Instruction (EOI) SO23-12-1, Standard Post Trip Actions and transition to EOI SO23-12-5, Steam Generator Tube Rupture.
Following the Safety Injection Actuation Signal, the Containment Cooling Actuation Signal fails to actuate requiring manual actions by the crew.
Following the Safety Injection Actuation Signal, the Containment Cooling Actuation Signal fails to actuate requiring manual actions by the crew.
 
The event is terminated when the affected Steam Generator is cooled down and the Reactor Coolant System is depressurized.
The event is terminated when the affected Steam Generator is cooled down and the Reactor Coolant System is depressurized.  
 
Risk Significance:
Risk Significance:
Risk important components out of service: None  
* Risk important components out of service:             None
 
* Failure of risk important system prior to trip:       Loss of Train B Component Cooling Water
Failure of risk important system prior to trip: Loss of Train B Component Cooling Water Risk significant core damage sequence: SGTR with MSIV failure Risk significant operator actions:   Restore Non-Critical CCW Loop flow Isolate Ruptured Steam Generator Cooldown and Depressurize RCS  
* Risk significant core damage sequence:               SGTR with MSIV failure
* Risk significant operator actions:                   Restore Non-Critical CCW Loop flow Isolate Ruptured Steam Generator Cooldown and Depressurize RCS SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc


Scenario Event Description NRC Scenario #4 SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc SONGS 2009 Facility NRC Initial License Examination Simulator Scenario Setup Machine Operator: EXECUTE IC #224 and NRC Scenario #4 SETUP file to align components. VERIFY Control Board Tags removed on P-050, P-015, and G-002.
Scenario Event Description NRC Scenario #4 SONGS 2009 Facility NRC Initial License Examination Simulator Scenario Setup Machine Operator:     EXECUTE IC #224 and NRC Scenario #4 SETUP file to align components.
VERIFY Control Board Tags removed on P-050, P-015, and G-002.
CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario born concentration.
CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario born concentration.
CHANGE Operator Aid Tag #005-9 (AFW T-120/121 alignment) to AUTO MAKEUP for both T-120 and T-121.
CHANGE Operator Aid Tag #005-9 (AFW T-120/121 alignment) to AUTO MAKEUP for both T-120 and T-121.
Line 2,536: Line 3,372:
ENSURE Steam Generator level is controlled at 50% to 55%.
ENSURE Steam Generator level is controlled at 50% to 55%.
PLACE Channel X Pressurizer Pressure and Pressurizer Level in service.
PLACE Channel X Pressurizer Pressure and Pressurizer Level in service.
PLACE procedures in progress on the RO desk:  
PLACE procedures in progress on the RO desk:
- Copy of SO23-5-1.3.1, Plant Startup from Hot Standby to Minimum Load INITIALED through Step 6.5.1.  
                      - Copy of SO23-5-1.3.1, Plant Startup from Hot Standby to Minimum Load INITIALED through Step 6.5.1.
- MARKED UP copy of SO23-5-1.7, Attachment 9.  
                      - MARKED UP copy of SO23-5-1.7, Attachment 9.
- MARKED UP copy of SO23-2-4, Auxiliary Feedwater System Operation Section 6.2.
                      - MARKED UP copy of SO23-2-4, Auxiliary Feedwater System Operation Section 6.2.
PLACE the MOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board.
PLACE the MOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board.
If Group Position(s) is (are) not correct, MOVE CEAs and then RETURN CEAs to Shift Turnover Sheet position (Group 6 @ 80; PLCEAs @ 75).
If Group Position(s) is (are) not correct, MOVE CEAs and then RETURN CEAs to Shift Turnover Sheet position (Group 6 @ 80; PLCEAs @ 75).
Significant Control Room Annunciators in Alarm
Significant Control Room Annunciators in Alarm:
: 50A02 - COLSS ALARM 53A(B)03 - MFWP TURBINE K006 (K005) TRIP 56A30/40/50/60 - LOSS OF LOAD CHANNEL 1/2/3/4 TRIP DISABLED 63E10 - SCE CB TRIP 99A24 - TURBINE TRIP RELAY TRIPPED 99B01 - GENERATOR TRIP 99B19 - VACUUM PROTECTION PLC TROUBLE  
50A02 - COLSS ALARM 53A(B)03 - MFWP TURBINE K006 (K005) TRIP 56A30/40/50/60 - LOSS OF LOAD CHANNEL 1/2/3/4 TRIP DISABLED 63E10 - SCE CB TRIP 99A24 - TURBINE TRIP RELAY TRIPPED 99B01 - GENERATOR TRIP 99B19 - VACUUM PROTECTION PLC TROUBLE SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 1 Page 4 of 17 Event
Appendix D                                         Operator Action                             Form ES-D-2 Operating Test :       NRC         Scenario #   4       Event #             1       Page 4   of 17 Event


== Description:==
== Description:==
Rod Withdrawal and Power Increase to ~2% Power Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc Machine Operator: ENSURE all Simulator Scenario Setup actions are complete.
Rod Withdrawal and Power Increase to ~2% Power Time         Position                               Applicants Actions or Behavior Machine Operator:           ENSURE all Simulator Scenario Setup actions are complete.
+1 min CRS DIRECT performance of SO23-5-1.3.1, Plant Startup from Hot Standup to Minimum Load.
DIRECT performance of SO23-5-1.3.1, Plant Startup from Hot Standup to
Floor Cue: The startup rate based on Attachment 9 data will be 0.3 to 0.5 DPM. In order to facilitate time requirements, REPORT as the Shift Manager to maintain this rate.
+1 min            CRS Minimum Load.
RO DISPLAY the PCS page for Regulating Group 6 per SO23-3-2.20.
Floor Cue:       The startup rate based on Attachment 9 data will be 0.3 to 0.5 DPM. In order to facilitate time requirements, REPORT as the Shift Manager to maintain this rate.
RO VERIFY all CEA Regulating Group bottom lamps on the Core Mimic Panel are EXTINGUISHED.
RO         DISPLAY the PCS page for Regulating Group 6 per SO23-3-2.20.
RO POSITION Mode Select Switch to MS (Manual Sequential).
VERIFY all CEA Regulating Group bottom lamps on the Core Mimic Panel RO are EXTINGUISHED.
RO POSITION Group Select Switch to CEA Group 6.
RO         POSITION Mode Select Switch to MS (Manual Sequential).
RO/CRS When directed by CRS, WIT HDRAW Control Rods as required.
RO         POSITION Group Select Switch to CEA Group 6.
RO ESTABLISH a Startup Rate of  0.5 DPM.
RO/CRS       When directed by CRS, WITHDRAW Control Rods as required.
BOP RAISE Auxiliary Feedwater flow as required to maintain Steam Generator  
RO         ESTABLISH a Startup Rate of  0.5 DPM.
 
RAISE Auxiliary Feedwater flow as required to maintain Steam Generator BOP levels between 50% and 55%.
levels between 50% and 55%.
RO         When CEA positioning is complete, PLACE Mode Select Switch to OFF.
RO When CEA positioning is complete, PLACE Mode Select Switch to OFF.
VERIFY proper operation of Steam Bypass Control System when the Point of BOP Adding Heat is reached (~2E-1%).
BOP VERIFY proper operation of Steam Bypass Control System when the Point of Adding Heat is reached (~2E
+15 min           BOP       MAINTAIN Tcold within band by monitoring SBCS operation.
-1%). +15 min BOP MAINTAIN Tcold within band by monitoring SBCS operation.
When power has been raised to ~2%, or at Lead Evaluators discretion, PROCEED to Event 2.
When power has been raised to ~2%, or at Lead Evaluator's discretion, PROCEED to Event 2.
SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 2 Page 5 of 17 Event
Appendix D                                       Operator Action                             Form ES-D-2 Operating Test :       NRC         Scenario #   4       Event #             2       Page 5   of 17 Event


== Description:==
== Description:==
Letdown Heat Exchanger Temperature Control Valve Failure Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc Machine Operator:   When directed, EXECUTE Event 2. - CVCS LP, Temperature Control Valves (TV-0224A and TV-0224B) fail to divert (BYPASS) on high temperature.
Letdown Heat Exchanger Temperature Control Valve Failure Time         Position                             Applicants Actions or Behavior Machine Operator:         When directed, EXECUTE Event 2.
Indications Available
                          - CVCS LP, Temperature Control Valves (TV-0224A and TV-0224B) fail to divert (BYPASS) on high temperature.
: 58A32 - LETDOWN HX OUTLET TEMP HI  
Indications Available:
  +30 secs RO REFER to Annunciator Response Procedures.
58A32 - LETDOWN HX OUTLET TEMP HI
RO RECOGNIZE Letdown Heat Exchanger outlet high temperature alarm and INFORM CRS ARP SO23-15-58.A, Annunciator 58A32 entry required.
  +30 secs           RO       REFER to Annunciator Response Procedures.
CRS DIRECT performance of ARP SO23-15-58.A, 58A32 - LETDOWN HX  
RECOGNIZE Letdown Heat Exchanger outlet high temperature alarm and RO INFORM CRS ARP SO23-15-58.A, Annunciator 58A32 entry required.
DIRECT performance of ARP SO23-15-58.A, 58A32 - LETDOWN HX CRS OUTLET TEMP HI.
DETERMINE that Demineralizer Temperature Control Valve failed to divert RO on high temperature and Manually POSITION TV-0224B to BYPASS.
DETERMINE that Boronometer Isolation Valve failed to Auto Close on high RO temperature and Manually POSITION TV-0224A to CLOSE.
If Letdown Heat Exchanger is > 130&deg;F take MANUAL control of TIC-0223 per RO SO23-2-17, CCW Operation.
CRS      CONTACT I&C to investigate cause of problem.
M.O. Cue:        If contacted as I&C to investigate problem, REMOVE override on the valve, WAIT one minute and REQUEST the RO PLACE TIC-0223 back in AUTO. REPORT that the valve has been sticking causing miscues in the temperature controller and that I&C is working on a repair.
+5 min                      MONITOR Letdown Heat Exchanger outlet temperature at least twice per RO shift.
When plant control is restored, or at Lead Evaluators discretion, PROCEED to Event 3.
SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc


OUTLET TEMP HI.
Appendix D                                         Operator Action                             Form ES-D-2 Operating Test :       NRC         Scenario #     4       Event #             3       Page 6   of 17 Event
RO DETERMINE that Demineralizer Temperature Control Valve failed to divert on high temperature and Manually POSITION TV-0224B to BYPASS.
RO DETERMINE that Boronometer Isolation Valve failed to Auto Close on high temperature and Manually POSITION TV-0224A to CLOSE.
RO If Letdown Heat Exchanger is > 130&deg;F take MANUAL control of TIC-0223 per SO23-2-17, CCW Operation.
CRS CONTACT I&C to investigate cause of problem.
M.O. Cue:  If contacted as I&C to investigate problem, REMOVE override on the valve, WAIT one minute and REQUEST the RO PLACE TIC-0223 back in AUTO. REPORT that the valve has been sticking causing miscues in the temperature controller and that I&C is working on a repair.
+5 min RO MONITOR Letdown Heat Exchanger outlet temperature at least twice per shift. When plant control is restored, or at Lead Evaluator's discretion, PROCEED to Event 3.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 3 Page 6 of 17 Event


== Description:==
== Description:==
Train B Component Cooling Water Heat Exchanger Tube Leak Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc Machine Operator: When directed, EXECUTE Event 3. - CC05B, Train B CCW Heat Exchanger tube leak @ 100% severity.
Train B Component Cooling Water Heat Exchanger Tube Leak Time         Position                                 Applicants Actions or Behavior Machine Operator:         When directed, EXECUTE Event 3.
Indications Available
                          - CC05B, Train B CCW Heat Exchanger tube leak @ 100% severity.
: 64A29 - CCW SURGE TANK TRAIN B LEVEL HI/LO (time delay of ~ 2 to 5 min)  
Indications Available:
+2 min BOP REFER to Annunciator Response Procedures.
64A29 - CCW SURGE TANK TRAIN B LEVEL HI/LO (time delay of ~ 2 to 5 min)
M.O. Cue: When the CCW Surge Tank level low alarms, LOWER malfunction CC05B to 50% severity to facilitate diagnosis of the event.
  +2 min         BOP       REFER to Annunciator Response Procedures.
BOP RECOGNIZE lowering Surge Tank level and INFORM the CRS AOI SO23-13-7 entry required.
M.O. Cue:         When the CCW Surge Tank level low alarms, LOWER malfunction CC05B to 50%
CRS DIRECT performance of AOI SO23-13-7, Loss of CCW/SWC.
severity to facilitate diagnosis of the event.
BOP ISOLATE Radwaste by closing 2HV-6465, 3HV-6465, 2HV-6217, and
RECOGNIZE lowering Surge Tank level and INFORM the CRS AOI BOP SO23-13-7 entry required.
CRS       DIRECT performance of AOI SO23-13-7, Loss of CCW/SWC.
ISOLATE Radwaste by closing 2HV-6465, 3HV-6465, 2HV-6217, and BOP 3HV-6217.
CRS/BOP      DETERMINE that the leak is not isolated.
CRS        DIRECT placing Train A CCW/SWC in service.
START CCW Pump P024 or P025 and VERIFY that SWC P112 BOP automatically starts.
+5 min            CRS        DIRECT transfer of the CCW Non-Critical Loop to Train A.
CRITICAL TASK            With loss of flow to the CCW Non-Critical Loop and prior to exceeding RCP STATEMENT              operating limits, restore flow to the NCL from any available CCW train.
CRITICAL TASK BOP        TRANSFER the CCW Non-Critical Loop to Train A.
CRS        DIRECT transfer of Letdown Heat Exchanger to Train A.
SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc


3HV-6217.
Appendix D                                         Operator Action                             Form ES-D-2 Operating Test :       NRC         Scenario #     4       Event #             3       Page 7   of 17 Event
CRS/BOP DETERMINE that the leak is not isolated.
CRS DIRECT placing Train A CCW/SWC in service.
BOP START CCW Pump P024 or P025 and VERIFY that SWC P112 automatically starts.
+5 min CRS DIRECT transfer of the CCW Non-Critical Loop to Train A.
CRITICAL TASK STATEMENT With loss of flow to the CCW Non-Critical Loop and prior to exceeding RCP operating limits, restore flow to the NCL from any available CCW train.
CRITICAL TASK BOP TRANSFER the CCW Non-Critical Loop to Train A.
CRS DIRECT transfer of Letdown Heat Exchanger to Train A.
 
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 3 Page 7 of 17 Event


== Description:==
== Description:==
Train B Component Cooling Water Heat Exchanger Tube Leak Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc BOP TRANSFER Letdown Heat Exchanger to Train A.
Train B Component Cooling Water Heat Exchanger Tube Leak Time         Position                               Applicants Actions or Behavior BOP       TRANSFER Letdown Heat Exchanger to Train A.
CRS DIRECT securing CCW Pump P026.
CRS       DIRECT securing CCW Pump P026.
BOP STOP CCW Pump P026 and SWC Pump P114.
BOP       STOP CCW Pump P026 and SWC Pump P114.
M.O. Cue: If directed to rack out breaker for CCW Pump P026, REPORT that it is in progress.
M.O. Cue:         If directed to rack out breaker for CCW Pump P026, REPORT that it is in progress.
CRS ENSURE ECCS is not required.
CRS       ENSURE ECCS is not required.
HPSI, LPSI, CS pumps are stopped.
* HPSI, LPSI, CS pumps are stopped.
CRS/BOP DISPATCH PEO to CLOSE Loop B CCW Surge Tank Outlet, HV-6505.
CRS/BOP       DISPATCH PEO to CLOSE Loop B CCW Surge Tank Outlet, HV-6505.
M.O. Cue: If directed to close 2HV-6505, Train B CCW Surge Tank Outlet Valve, WAIT 3 minutes and EXECUTE remote function CC61.
M.O. Cue:         If directed to close 2HV-6505, Train B CCW Surge Tank Outlet Valve, WAIT 3 minutes and EXECUTE remote function CC61.
M.O. Cue: If contacted to report status of Unit 3 CCW Surge Tank Level, REPORT that Train A CCW Surge Tank level is stable and unchanged.  
M.O. Cue:         If contacted to report status of Unit 3 CCW Surge Tank Level, REPORT that Train A CCW Surge Tank level is stable and unchanged.
+10 min CRS EVALUATE Technical Specifications.
+10 min           CRS       EVALUATE Technical Specifications.
LCO 3.7.7.A, Component Cooling Water System.
* LCO 3.7.7.A, Component Cooling Water System.
CONDITION A - One CCW Train inoperable. ACTION A.1 - Restore CCW Train to OPERABLE status within 72 hours. When Technical Specifications are addressed, or at Lead Evaluator's discretion, PROCEED to Event 4.  
* CONDITION A - One CCW Train inoperable.
* ACTION A.1 - Restore CCW Train to OPERABLE status within 72 hours.
When Technical Specifications are addressed, or at Lead Evaluators discretion, PROCEED to Event 4.
SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 4 Page 8 of 17 Event
Appendix D                                         Operator Action                           Form ES-D-2 Operating Test :       NRC         Scenario #     4     Event #             4       Page 8   of 17 Event


== Description:==
== Description:==
Steam Bypass Control Valves Close Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc Machine Operator: When directed, EXECUTE Event 4. - RX08, Steam Bypass Control Valves HV-8423 and HV-8425 close.
Steam Bypass Control Valves Close Time         Position                             Applicants Actions or Behavior Machine Operator:         When directed, EXECUTE Event 4.
Indications Available
                            - RX08, Steam Bypass Control Valves HV-8423 and HV-8425 close.
: 50A07 - SDCS DEMAND PRESENT (possible reflash) Reactor Coolant System temperature rising Reactor power slowly lowering  
Indications Available:
+ 1 min RO/BOP RECOGNIZE Reactor Coolant System temperature rising and power level lowering.
50A07 - SDCS DEMAND PRESENT (possible reflash)
BOP DETERMINE both Steam Bypass Control Valves have closed.
Reactor Coolant System temperature rising Reactor power slowly lowering RECOGNIZE Reactor Coolant System temperature rising and power level
CRS VERIFY proper operation of the SBCS System per SO23-3-2.18, Steam Bypass System Operation.
+ 1 min        RO/BOP lowering.
Examiner Note: Any one of the methods listed is acceptable to regain control of the Steam Bypass Control Valves.
BOP       DETERMINE both Steam Bypass Control Valves have closed.
BOP PERFORM one of the following to regain control of the Steam Bypass  
VERIFY proper operation of the SBCS System per SO23-3-2.18, Steam CRS Bypass System Operation.
Examiner Note: Any one of the methods listed is acceptable to regain control of the Steam Bypass Control Valves.
PERFORM one of the following to regain control of the Steam Bypass BOP Control Valves:
* TRANSFER Master Controller PIC-8431 to LOCAL MANUAL to open valves.
* PLACE SBCS Valve Controllers HV-8423 and HV-8425 in LOCAL to open valves.
RESTORE Reactor Coolant System temperature and Reactor power to BOP program.
CRS        REFER to SO23-3-2.18, Steam Bypass System Operation as required.
When RCS pressure and temperature control are restored, or at Lead Evaluators discretion, PROCEED to Event 5.
SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc


Control Valves:
Appendix D                                         Operator Action                           Form ES-D-2 Operating Test :       NRC       Scenario #     4     Event #             5       Page 9   of 17 Event
TRANSFER Master Controller PIC-8431 to LOCAL MANUAL to open valves. PLACE SBCS Valve Controllers HV-8423 and HV-8425 in LOCAL to open valves.
BOP RESTORE Reactor Coolant System temperature and Reactor power to program. CRS REFER to SO23-3-2.18, Steam Bypass System Operation as required.
When RCS pressure and temperature control are restored, or at Lead Evaluator's discretion, PROCEED to Event 5.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 5 Page 9 of 17 Event


== Description:==
== Description:==
Steam Generator Tube Leak on E089 Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc Machine Operator: When directed, EXECUTE Event 4. - SG06B @ 0.15%, Steam Generator Tube Leak on E089 of ~50 gpm.
Steam Generator Tube Leak on E089 Time         Position                             Applicants Actions or Behavior Machine Operator:         When directed, EXECUTE Event 4.
Indications Available
                          - SG06B @ 0.15%, Steam Generator Tube Leak on E089 of ~50 gpm.
: 60A46 - SECONDARY RADIATION HI Auto Start of standby Charging Pump RO/BOP REFER to Annunciator Response Procedures.
Indications Available:
BOP RECOGNIZE increasing radiation levels and INFORM the CRS AOI SO23-13-14 entry required.  
60A46 - SECONDARY RADIATION HI Auto Start of standby Charging Pump RO/BOP       REFER to Annunciator Response Procedures.
+1 min CRS DIRECT performance of SO23-13-14, RCS Leak, Section for Primary to  
RECOGNIZE increasing radiation levels and INFORM the CRS AOI BOP SO23-13-14 entry required.
+1 min                       DIRECT performance of SO23-13-14, RCS Leak, Section for Primary to CRS Secondary leakage.
M.O. Cue:        When contacted as Chemistry, WAIT 5 minutes and REPORT that a frisk of the SG sample indicates high activity in SG E089. WAIT another 5 minutes, and then REPORT that high activity in SG E089 is verified.
CRS/RO      DETERMINE PZR level is lowering.
RO        START Charging Pumps to maintain Pressurizer level.
CRS/RO      DETERMINE VCT level is lowering.
RO        OPERATE Makeup System to maintain VCT level as needed.
DETERMINE Steam Generator tube leak is greater than 75 gpd and rising at CRS/RO greater than 30 gpd/hr.
DIRECT a Reactor Trip and ENTRY into SO23-12-1, Standard Post Trip CRS Actions.
SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc


Secondary leakage.
Appendix D                                        Operator Action                            Form ES-D-2 Operating Test :       NRC      Scenario #      4      Event #            5       Page 10    of 17 Event
M.O. Cue: When contacted as Chemistry, WAIT 5 minutes and REPORT that a frisk of the SG sample indicates high activity in SG E089. WAIT another 5 minutes, and then REPORT that high activity in SG E089 is verified.
CRS/RO DETERMINE PZR level is lowering.
RO START Charging Pumps to maintain Pressurizer level.
CRS/RO DETERMINE VCT level is lowering.
RO OPERATE Makeup System to maintain VCT level as needed.
CRS/RO DETERMINE Steam Generator tube leak is greater than 75 gpd and rising at


greater than 30 gpd/hr.
== Description:==
CRS DIRECT a Reactor Trip and ENTRY into SO23-12-1, Standard Post Trip
Steam Generator Tube Leak on E089 Time          Position                            Applicants Actions or Behavior
+10 min          CRS      EVALUATE Technical Specifications.
* LCO 3.4.13.B, RCS Operational Leakage.
* CONDITION B - Primary to secondary LEAKAGE not within limits.
* ACTION B.1 - Be in MODE 3 in 6 hours.
* ACTION B.2 - Be in MODE 5 in 36 hours.
When Technical Specifications are addressed, or at Lead Evaluators discretion, PROCEED to Events 6 and 7.
SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc


Actions.
Appendix D                                         Operator Action                             Form ES-D-2 Operating Test :       NRC       Scenario #     4       Event #         6&7        Page 11    of 17 Event
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 5 Page 10 of 17 Event


== Description:==
== Description:==
Steam Generator Tube Leak on E089 Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc
Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time         Position                             Applicants Actions or Behavior Machine Operator:          When directed, EXECUTE Events 6 and 7.
+10 min CRS EVALUATE Technical Specifications.
                          - SG06B @ 0.9%, Steam Generator E089 Tube Rupture @ ~300 gpm.
LCO 3.4.13.B, RCS Operational Leakage.
                          - CCAS LP, Containment Cooling Actuation Signal fails to actuate.
CONDITION B - Primary to secondary LEAKAGE not within limits. ACTION B.1 - Be in MODE 3 in 6 hours. ACTION B.2 - Be in MODE 5 in 36 hours.
Indications Available:
When Technical Specifications are addressed, or at Lead Evaluator's discretion, PROCEED to Events 6 and 7.
60A46 - SECONDARY RADIATION HI (reflash) 63B02 - UNIT 2 CRITICAL PARAMETER PROBLEM RO/BOP      TRIP the Reactor and ENTER SO23-12-1, Standard Post Trip Actions.
RO        VERIFY Reactor Trip:
* VERIFY Reactor Trip Circuit Breakers (8) open.
* VERIFY Reactor Power lowering and Startup Rate negative.
* VERIFY maximum of one full length CEA NOT fully inserted.
CRS       VERIFY Reactivity Control criteria satisfied.
BOP        VERIFY Turbine Trip:
* VERIFY Main Turbine tripped.
* HP and LP Stop and Governor Valves closed.
* VERIFY both Unit Output Breakers open.
* VERIFY Main Turbine speed < 2000 RPM or lowering.
CRS        INITIATE Administrative Actions:
* ANNOUNCE Reactor trip via PA System.
* INITIATE Attachment 4, Worksheet.
* INITIATE Attachment 5, Administrative Actions.
BOP        VERIFY Vital Auxiliaries criteria satisfied:
* VERIFY both 1E 4 kV Buses A04 and A06 energized.
* VERIFY both 1E 480 V Buses B04 and B06 energized.
* VERIFY all 1E DC Buses energized.
* VERIFY all Non-1E 4 kV Buses energized.
SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 6 & 7 Page 11 of 17 Event
Appendix D                                         Operator Action                             Form ES-D-2 Operating Test :       NRC       Scenario #     4       Event #         6&7       Page 12    of 17 Event


== Description:==
== Description:==
Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc Machine Operator: When directed, EXECUTE Events 6 and 7. - SG06B @ 0.9%, Steam Generator E089 Tube Rupture @ ~300 gpm. - CCAS LP, Containment Cooling Actuation Signal fails to actuate.
Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time         Position                             Applicants Actions or Behavior
Indications Available
* VERIFY one CCW Train operating AND aligned to Non-Critical Loop and Letdown Heat Exchanger.
: 60A46 - SECONDARY RADIATION HI (reflash)
RO        DETERMINE RCS Inventory Control criteria NOT satisfied:
* DETERMINE PZR level between 10% and 70% and NOT trending to between 30% and 60%.
                                *  [RNO] DETERMINE PZR Level Control System is NOT restoring PZR level.
* VERIFY Core Exit Saturation Margin  20&deg;F:
* QSPDS page 611.
* CFMS page 311.
RO        DETERMINE RCS Pressure Control criteria NOT satisfied:
* DETERMINE PZR pressure (WR and NR) between 1740 PSIA and 2380 PSIA and NOT controlled AND NOT trending to 2025 PSIA and 2275 PSIA.
                                *  [RNO] DETERMINE PZR Pressure Control System is NOT restoring PZR pressure.
                                *  [RNO] ENSURE Normal and Aux Spray valves closed.
                                *  [RNO] ENSURE SIAS, CCAS, and CRIS actuated.
                                *  [RNO] If PZR pressure is < 1430 PSIA, then ENSURE at least one RCP in each loop stopped.
RO        VERIFY Core Heat Removal criteria satisfied:
* VERIFY at least one RCP operating.
* VERIFY Core Loop T < 10&deg;F.
* VERIFY Core Exit Saturation Margin  20&deg;F.
* QSPDS page 611.
* CFMS page 311.
Examiner Note: RCS Heat Removal may or may not be satisfied depending upon RCS temperature as the Steam Bypass Control System may be in MANUAL.
SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc


63B02 - UNIT 2 CRITICAL PARAMETER PROBLEM RO/BOP TRIP the Reactor and ENTER SO23-12-1, Standard Post Trip Actions.
Appendix D                                         Operator Action                             Form ES-D-2 Operating Test :       NRC       Scenario #       4       Event #         6&7       Page 13    of 17 Event
RO VERIFY Reactor Trip:
VERIFY Reactor Trip Circuit Breakers (8) open.
VERIFY Reactor Power lowering and Startup Rate negative.
VERIFY maximum of one full length CEA NOT fully inserted.
CRS VERIFY Reactivity Control criteria satisfied.
BOP VERIFY Turbine Trip:
VERIFY Main Turbine tripped.
HP and LP Stop and Governor Valves closed.
VERIFY both Unit Output Breakers open.
VERIFY Main Turbine speed < 2000 RPM or lowering.
CRS INITIATE Administrative Actions:
ANNOUNCE Reactor trip via PA System.
INITIATE Attachment 4, Worksheet.
INITIATE Attachment 5, Administrative Actions.
BOP VERIFY Vital Auxiliaries criteria satisfied:
VERIFY both 1E 4 kV Buses A04 and A06 energized.
VERIFY both 1E 480 V Buses B04 and B06 energized.
VERIFY all 1E DC Buses energized.
VERIFY all Non-1E 4 kV Buses energized.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 6 & 7 Page 12 of 17 Event


== Description:==
== Description:==
Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc VERIFY one CCW Train operating AND aligned to Non-Critical Loop and Letdown Heat Exchanger.
Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time         Position                             Applicants Actions or Behavior BOP      DETERMINE RCS Heat Removal criteria NOT satisfied:
RO DETERMINE RCS Inventory Control criteria NOT satisfied:
* VERIFY both SGs level > 21% NR.
DETERMINE PZR level between 10% and 70% and NOT trending to between 30% and 60%.
* VERIFY both SGs level < 80% NR.
[RNO] DETERMINE PZR Level Control System is NOT restoring PZR level.
* VERIFY Auxiliary Feedwater available to restore both SGs level between 40% NR and 80% NR.
VERIFY Core Exit Saturation Margin  20&deg;F:    QSPDS page 611.
                                *    [RNO] If required, manually INITIATE EFAS.
CFMS page 311.
* DETERMINE Tcold < 545&deg;F and NOT controlled.
RO DETERMINE RCS Pressure Control criteria NOT satisfied:
                                *    [RNO] ENSURE SBCS valves closed.
DETERMINE PZR pressure (WR and NR) between 1740 PSIA and 2380 PSIA and NOT controlled AND NOT trending to 2025 PSIA and 2275 PSIA.   [RNO] DETERMINE PZR Pressure Control System is NOT restoring PZR pressure.
                                *    [RNO] ENSURE ADVs closed.
[RNO] ENSURE Normal and Aux Spray valves closed.
                                *    [RNO] ENSURE SG Blowdown valves closed.
[RNO] ENSURE SIAS, CCAS, and CRIS actuated.
* E-088 - HV-4054          E-089 - HV-4053
[RNO] If PZR pressure is < 1430 PSIA, then ENSURE at least one RCP in each loop stopped.
                                *    [RNO] ENSURE Main Steam to Reheater Valves closed.
RO VERIFY Core Heat Removal criteria satisfied:
* HV-2703 or HV-2704; HV-2721; HV-2751
VERIFY at least one RCP operating.
* VERIFY SG pressures greater than 740 PSIA.
VERIFY Core Loop T < 10&deg;F.
RO       DETERMINE Containment Isolation criteria NOT satisfied:
VERIFY Core Exit Saturation Margin 20&deg;F. QSPDS page 611.
* VERIFY Containment pressure < 1.5 PSIG.
CFMS page 311.
* VERIFY Containment Area Radiation Monitors energized and NOT alarming or trending to alarm.
Examiner Note:  RCS Heat Removal may or may not be satisfied depending upon RCS temperature as the Steam Bypass Control System may be in MANUAL.  
* DETERMINE Secondary Plant Radiation Monitors energized AND alarming or trending to alarm.
RO        VERIFY Containment Temperature and Pressure criteria satisfied:
* VERIFY Containment average temperature < 120&deg;F.
* VERIFY Containment pressure < 1.5 PSIG.
  +15 min          CRS      DIAGNOSE event in progress:
* DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.
                                *  [RNO] COMPLETE Attachment 1, Recovery Diagnostics.
                                *  [RNO] DIAGNOSE event as SGTR on SG E089.
* DETERMINE that Reactor Trip Recovery is NOT diagnosed.
SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 6 & 7 Page 13 of 17 Event
Appendix D                                         Operator Action                             Form ES-D-2 Operating Test :       NRC         Scenario #     4       Event #         6&7       Page 14    of 17 Event


== Description:==
== Description:==
Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc BOP DETERMINE RCS Heat Removal criteria NOT satisfied:
Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time         Position                             Applicants Actions or Behavior RO            *  [RNO] ENSURE one RCP in each loop stopped.
VERIFY both SGs level > 21% NR.
* DIRECT initiating Steps 12 through 15.
VERIFY both SGs level < 80% NR.
BOP      INITIATE Steps 12 through 15.
VERIFY Auxiliary Feedwater available to restore both SGs level between 40% NR and 80% NR.
CRS      DIRECT performance of SO23-12-4, Steam Generator Tube Rupture.
[RNO] If required, manually INITIATE EFAS.
CRS      RECORD time of EOI entry __________.
DETERMINE T cold < 545&deg;F and NOT controlled.
CRS      VERIFY SGTR Diagnosis:
[RNO] ENSURE SBCS valves closed.
* INITIATE SO23-12-10, Safety Function Status Checks.
[RNO] ENSURE ADVs closed.
* INITIATE Foldout Page.
[RNO] ENSURE SG Blowdown valves closed.
* DIRECT performance of FS-7, SI Throttle/Stop Criteria.
E-088 - HV-4054 E-089 - HV-4053
* DIRECT performance of SO23-12-11, Attachment 22, Non-Qualified Load Restoration.
[RNO] ENSURE Main Steam to Reheater Valves closed.
* VERIFY SGTR diagnosis using Figure 1, Break Identification Chart.
HV-2703 or HV-2704; HV-2721; HV-2751 VERIFY SG pressures greater than 740 PSIA.
* INITIATE sampling of both Steam Generators for radioactivity and boron.
RO DETERMINE Containment Isolation criteria NOT satisfied:
M.O. Cue:        If directed to sample SGs, WAIT 5 minutes and then REPORT that E089 has elevated radiation levels and boron levels. If the SG sample valves are closed, REPORT that you are unable to establish sample flow.
VERIFY Containment pressure < 1.5 PSIG.
CRS       INITIATE Administrative actions:
VERIFY Containment Area Radiation Monitors energized and NOT alarming or trending to alarm.
* NOTIFY Shift Manager/Operations Leader of SO23-12-4, Steam Generator Tube Rupture initiation.
DETERMINE Secondary Plant Radiation Monitors energized AND alarming or trending to alarm.
* ENSURE Emergency Plan is initiated.
RO VERIFY Containment Temperature and Pressure criteria satisfied:
* IMPLEMENT Placekeeper.
VERIFY Containment average temperature < 120&deg;F.
Reduce Reactor Coolant System Thot to less than 530&deg;F within 30 minutes of CRITICAL TASK            optimal EOI entry.
VERIFY Containment pressure < 1.5 PSIG.  
STATEMENT Elapsed Time: ____________
+15 min CRS DIAGNOSE event in progress:
CRITICAL TASK CRS      DIRECT lowering RCS THOT to less than 530&deg;F:
DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.
SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc
[RNO] COMPLETE Attachment 1, Recovery Diagnostics.
[RNO] DIAGNOSE event as SGTR on SG E089.
DETERMINE that Reactor Trip Recovery is NOT diagnosed.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 6 & 7 Page 14 of 17 Event


== Description:==
Appendix D                                         Operator Action                             Form ES-D-2 Operating Test :       NRC         Scenario #   4       Event #         6&7       Page 15   of 17 Event
Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc RO  [RNO] ENSURE one RCP in each loop stopped.
DIRECT initiating Steps 12 through 15.
BOP INITIATE Steps 12 through 15.
CRS DIRECT performance of SO23-12-4, Steam Generator Tube Rupture.
CRS RECORD time of EOI entry __________.
CRS VERIFY SGTR Diagnosis:
INITIATE SO23-12-10, Safety Function Status Checks.
INITIATE Foldout Page.
DIRECT performance of FS-7, SI Throttle/Stop Criteria.
DIRECT performance of SO23-12-11, Attachment 22, Non-Qualified Load Restoration.
VERIFY SGTR diagnosis using Figure 1, Break Identification Chart.
INITIATE sampling of both Steam Generators for radioactivity and boron.
M.O. Cue: If directed to sample SGs, WAIT 5 minutes and then REPORT that E089 has elevated radiation levels and boron levels. If the SG sample valves are closed, REPORT that you are unable to establish sample flow.
CRS INITIATE Administrative actions:
NOTIFY Shift Manager/Operations Leader of SO23-12-4, Steam Generator Tube Rupture initiation.
ENSURE Emergency Plan is initiated.
IMPLEMENT Placekeeper.
CRITICAL TASK STATEMENT Reduce Reactor Coolant System Thot to less than 530&deg;F within 30 minutes of optimal EOI entry. Elapsed Time: ____________
CRITICAL TASK CRS DIRECT lowering RCS T HOT to less than 530&deg;F:
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 6 & 7 Page 15 of 17 Event


== Description:==
== Description:==
Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc BOP VERIFY both SGs available for cooldown.
Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time         Position                             Applicants Actions or Behavior BOP
ENSURE one RCP in each loop stopped.
* VERIFY both SGs available for cooldown.
INITIATE lowering T HOT to less than 530&deg;F using SBCS.
* ENSURE one RCP in each loop stopped.
RO RESET SG Low Pressure Setpoints during controlled cooldown.
* INITIATE lowering THOT to less than 530&deg;F using SBCS.
RO VERIFY ESF Actuation:
RO
DETERMINE SIAS actuation required.
* RESET SG Low Pressure Setpoints during controlled cooldown.
DETERMINE PZR pressure trending to SIAS setpoint.
RO       VERIFY ESF Actuation:
RO ENSURE the following actuated:
* DETERMINE SIAS actuation required.
SIAS / CCAS / CRIS.
* DETERMINE PZR pressure trending to SIAS setpoint.
DETERMINE CCAS did NOT actuate and manually INITIATE CCAS.
RO       ENSURE the following actuated:
CRS RECORD time of SIAS entry __________.
* SIAS / CCAS / CRIS.
BOP STOP unloaded Diesel Generators (SIAS Override STOP).
* DETERMINE CCAS did NOT actuate and manually INITIATE CCAS.
BOP INITIATE SO23-12-11, Attachment 22, Non-Qualified Load Restoration.
CRS       RECORD time of SIAS entry __________.
M.O. Cue: When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored non-qualified loads.
BOP       STOP unloaded Diesel Generators (SIAS Override STOP).
RO ATTEMPT to OVERRIDE and OPEN Instrument Air to Containment.
BOP       INITIATE SO23-12-11, Attachment 22, Non-Qualified Load Restoration.
M.O. Cue: When directed to isolate IA to Containment, REPORT as the ARO that you will restore IA. EXECUTE remote function IA52, to CLOSE MU060, RESET Excess Flow Check Valve, then EXECUTE remote function IA52 to OPEN MU060.
M.O. Cue:         When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored non-qualified loads.
RO       ATTEMPT to OVERRIDE and OPEN Instrument Air to Containment.
M.O. Cue:         When directed to isolate IA to Containment, REPORT as the ARO that you will restore IA. EXECUTE remote function IA52, to CLOSE MU060, RESET Excess Flow Check Valve, then EXECUTE remote function IA52 to OPEN MU060.
REPORT to the Control Room that Instrument Air to Containment is restored.
REPORT to the Control Room that Instrument Air to Containment is restored.
Examiner Note: The CRS may elect to secure Train B ECCS components due to loss of Train B Component Cooling Water.  
Examiner Note:           The CRS may elect to secure Train B ECCS components due to loss of Train B Component Cooling Water.
SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 6 & 7 Page 16 of 17 Event
Appendix D                                         Operator Action                             Form ES-D-2 Operating Test :       NRC     Scenario #       4       Event #         6&7       Page 16   of 17 Event


== Description:==
== Description:==
Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc RO ESTABLISH Optimum SI Alignment:
Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time         Position                             Applicants Actions or Behavior RO       ESTABLISH Optimum SI Alignment:
ESTABLISH two train operation.
* ESTABLISH two train operation.
All Charging Pumps operating.
* All Charging Pumps operating.
One HPSI and one LPSI per train operating.
* One HPSI and one LPSI per train operating.
All Cold leg flow paths aligned.
* All Cold leg flow paths aligned.
VERIFY SI flow required:
* VERIFY SI flow required:
SI flow indicated.
* SI flow indicated.
RO DETERMINE FS-7, VERIFY SI Throttle/Stop Criteria NOT satisfied.
RO
CREW IDENTIFY E089 as affected SG:
* DETERMINE FS-7, VERIFY SI Throttle/Stop Criteria NOT satisfied.
EVALUATE SG radioactive release indications - rising.
CREW       IDENTIFY E089 as affected SG:
SG Blowdown monitors.
* EVALUATE SG radioactive release indications - rising.
SG sample results.
* SG Blowdown monitors.
Steam line monitors.
* SG sample results.
BOP EVALUATE indications on E089 SG level rising when not feeding.
* Steam line monitors.
SG feedwater flowrate - signi ficantly mismatched between SGs.
BOP
Steam/feed flow prior to trip NOT normal.
* EVALUATE indications on E089
BOP  OPERATE AFW to maintain Steam Generator E089 level > 40% AND RCS cooldown less than 100&deg;F.
* SG level rising when not feeding.
CRS NOTIFY Shift Manager/Operations Leader that E089 is affected SG.
* SG feedwater flowrate - significantly mismatched between SGs.
BOP VERIFY Heat Removal by SG E088:
* Steam/feed flow prior to trip NOT normal.
VERIFY AFW Pump P504 available and operating.
* OPERATE AFW to maintain Steam Generator E089 level > 40% AND BOP RCS cooldown less than 100&deg;F.
VERIFY SG E088 available for continued heat removal.
CRS
CREW ISOLATE the most affected Steam Generator (SGTR).
* NOTIFY Shift Manager/Operations Leader that E089 is affected SG.
RO ENSURE RCS T hot less than 530&deg;F.  
BOP       VERIFY Heat Removal by SG E088:
* VERIFY AFW Pump P504 available and operating.
* VERIFY SG E088 available for continued heat removal.
CREW       ISOLATE the most affected Steam Generator (SGTR).
RO
* ENSURE RCS Thot less than 530&deg;F.
SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 6 & 7 Page 17 of 17 Event
Appendix D                                         Operator Action                             Form ES-D-2 Operating Test :       NRC       Scenario #     4       Event #         6&7       Page 17   of 17 Event


== Description:==
== Description:==
Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc CRITICAL TASK STATEMENT Isolate the Most Affected Steam Generator (E089) within 30 minutes of optimal EOI entry. Elapsed Time: ____________
Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time         Position                             Applicants Actions or Behavior Isolate the Most Affected Steam Generator (E089) within 30 minutes of optimal CRITICAL TASK          EOI entry.
CRITICAL TASK BOP ISOLATE SG E089, CLOSE / STOP the following components:
STATEMENT Elapsed Time: ____________
MSIV HV-8204   MSIV Bypass HV-8202   ADV HV-8421   MFIV HV-4052   AFW Valves HV-4731 and HV-4715 Steam to AFW P-140 HV-8200   SG Blowdown Isolation HV-4053 SG Water Sample Isolation HV-4057 Electric AFW Pump P-141   CRS RECORD time of SG isolation ____________.
CRITICAL TASK BOP       ISOLATE SG E089, CLOSE / STOP the following components:
BOP ENSURE ADV on SG E089 - selected to MANUAL.  
MSIV                                   HV-8204 MSIV Bypass                           HV-8202 ADV                                   HV-8421 MFIV                                   HV-4052 AFW Valves                             HV-4731 and HV-4715 Steam to AFW P-140                     HV-8200 SG Blowdown Isolation                 HV-4053 SG Water Sample Isolation             HV-4057 Electric AFW Pump                     P-141 CRS
+30 min BOP  CONTACT outside operator to CLOSE Main Steam Drain Isolation valves. When SG E089 is isolated, or at the Lead Evaluator's discretion, TERMINATE the scenario.  
* RECORD time of SG isolation ____________.
BOP
* ENSURE ADV on SG E089 - selected to MANUAL.
* CONTACT outside operator to CLOSE Main Steam Drain Isolation
+30 min          BOP valves.
When SG E089 is isolated, or at the Lead Evaluators discretion, TERMINATE the scenario.
SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc


Appendix D Scenario Outline Form ES-D-1 SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc Facility: SONGS 2 and 3 Scenario No.: 5 Op Test No.: October 2009 NRC Examiners:   Operators:
Appendix D                                   Scenario Outline                                     Form ES-D-1 Facility:         SONGS 2 and 3                 Scenario No.:         5     Op Test No.:   October 2009 NRC Examiners:                                               Operators:
Initial Conditions: 74% power BOC - RCS Boron is 1687 ppm (by sample). Train B Component Cooling Water Pump (P-026) in service. Channel Y Pressurizer Pressure and Level Control in service. Control Element Assembly Calculator #2 in service. Vacuum Pump (P-054) OOS for hogging valve repair. Fire Computer is OOS. Turnover: Maintain steady-state plant conditions.
Initial Conditions:
Critical Tasks: Manually Trip the Reactor (Reactor Protection System failure).
* 74% power BOC - RCS Boron is 1687 ppm (by sample).
Perform High Pressure Safety Injection Throttle/Stop actions (LOCA). Event No. Malf. No. Event Type* Event Description 1 +10 min SC01D C (BOP, CRS) TS (CRS) Salt Water Cooling Pump (P-114) trips on seized shaft.
* Train B Component Cooling Water Pump (P-026) in service.
2 +20 min RC15B I (RO, CRS) Pressurizer Pressure Control Channel (PT-0100Y) fails low.
* Channel Y Pressurizer Pressure and Level Control in service.
3 +30 min RP18 I (RO, CRS) TS (CRS) Control Element Assembly Calculator #2 failure.
* Control Element Assembly Calculator #2 in service.
4 +35 min TU08 M (RO, BOP, CRS)
* Vacuum Pump (P-054) OOS for hogging valve repair.
* Fire Computer is OOS.
Turnover:             Maintain steady-state plant conditions.
Critical Tasks:
* Manually Trip the Reactor (Reactor Protection System failure).
* Perform High Pressure Safety Injection Throttle/Stop actions (LOCA).
Event No.     Malf. No.     Event Type*                                 Event Description 1       SC01D       C (BOP, CRS)         Salt Water Cooling Pump (P-114) trips on seized shaft.
+10 min                 TS (CRS) 2      RC15B       I (RO, CRS)           Pressurizer Pressure Control Channel (PT-0100Y) fails low.
+20 min 3      RP18       I (RO, CRS)           Control Element Assembly Calculator #2 failure.
+30 min                  TS (CRS) 4       TU08        M (RO, BOP, CRS) Inadvertent Main Turbine trip.
+35 min 5      RP15        I (RO)                Reactor fails to automatically trip.
+35 min 6      TC02E      C (BOP)              High Pressure Turbine Stop Valve (HV-2200E) fails to close.
+35 min 7      RC18A      M (RO, BOP, CRS) Pressurizer Safety Valve (PSV-0200) fails open on the trip and
+45 min                                        reseats after Safety Injection is actuated.
8      FW23        C (BOP)              Loss of Condenser vacuum.
+45 min
    *    (N)ormal,  (R)eactivity,  (I)nstrument,  (C)omponent,    (M)ajor, (TS) Technical Specifications SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc


Inadvertent Main Turbine trip.
Appendix D                               Scenario Outline                                 Form ES-D-1 SCENARIO  
5 +35 min RP15 I (RO) Reactor fails to automatically trip.
6 +35 min TC02E C (BOP) High Pressure Turbine Stop Valve (HV-2200E) fails to close.
7 +45 min RC18A M (RO, BOP, CRS)
Pressurizer Safety Valve (PSV-0200) fails open on the trip and reseats after Safety Injection is actuated.
8 +45 min FW23 C (BOP) Loss of Condenser vacuum. * (N)ormal,    (R)eactivity,    (I)nstrument,    (C)omponent,    (M)ajor,  (TS) Technical Specifications
 
Appendix D Scenario Outline Form ES-D-1 SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc SCENARIO  


==SUMMARY==
==SUMMARY==
NRC #5 The crew will assume the watch and maintain steady-state conditions per Operating Instruction (OI)
NRC #5 The crew will assume the watch and maintain steady-state conditions per Operating Instruction (OI)
SO23-5-1.7, Power Operations.  
SO23-5-1.7, Power Operations.
 
The first event is a loss of Saltwater Cooling Pump P-114. The crew will respond per Abnormal Operating Instruction (AOI) SO23-13-7, Loss of Component Cooling Water/Saltwater Cooling System by starting Train A Component Cooling Water System. Additionally, the Non-Critical Loop and Letdown Heat Exchanger must also be transferred to Train A. The CRS will evaluate Technical Specifications.
The first event is a loss of Saltwater Cooling Pump P-114. The crew will respond per Abnormal Operating Instruction (AOI) SO23-13-7, Loss of Component Cooling Water/Saltwater Cooling System by starting Train A Component Cooling Water System. Additionally, the Non-Critical Loop and Letdown Heat Exchanger must also be transferred to Train A. The CRS will evaluate Technical Specifications.  
The next event is a low failure of Pressurizer Pressure Channel Y. Operator actions are per AOI SO23-13-27, Pressurizer Pressure and Level Malfunction. The crew will transfer to Channel X and restore Pressurizer pressure and heater functions.
 
The next event is a low failure of Pressurizer Pressure Channel Y. Operator actions are per AOI SO23-13-27, Pressurizer Pressure and Level Malfunction. The crew will transfer to Channel X and restore Pressurizer pressure and heater functions.
 
Once plant conditions are stable, Control Element Assembly Calculator (CEAC) #2 will fail. The crew will respond per the Annunciator Response Procedures (ARP) and OI SO23-3-2.13, Core Protection /
Once plant conditions are stable, Control Element Assembly Calculator (CEAC) #2 will fail. The crew will respond per the Annunciator Response Procedures (ARP) and OI SO23-3-2.13, Core Protection /
Control Element Assembly Calculator Operation and transfer to CEAC #1 to restore Rod Position Indication. The CRS will evaluate Technical Specifications.  
Control Element Assembly Calculator Operation and transfer to CEAC #1 to restore Rod Position Indication. The CRS will evaluate Technical Specifications.
 
The major event is initiated by an inadvertent Main Turbine trip. Upon Main Turbine trip, a Pressurizer Safety Valve will open and remain open until Safety Injection actuates and close when the Safety Injection Actuation Signal is received. The crew will enter Emergency Operating Instruction (EOI)
The major event is initiated by an inadvertent Main Turbine trip. Upon Main Turbine trip, a Pressurizer Safety Valve will open and remain open until Safety Injection actuates and close when the Safety Injection Actuation Signal is received. The crew will enter Emergency Operating Instruction (EOI) SO23-12-1, Standard Post Trip Actions. The CRS will determine that entry into EOI SO23-12-2, Reactor Trip Recovery is warranted because Pressurizer pressure and level are rising with no indications of radiation or leakage into Containment. In the event the opening and closing of the Pressurizer Safety Valve is not observed, the crew may enter EOI SO23-12-3, Loss of Coolant Accident.
SO23-12-1, Standard Post Trip Actions. The CRS will determine that entry into EOI SO23-12-2, Reactor Trip Recovery is warranted because Pressurizer pressure and level are rising with no indications of radiation or leakage into Containment. In the event the opening and closing of the Pressurizer Safety Valve is not observed, the crew may enter EOI SO23-12-3, Loss of Coolant Accident.
 
The inadvertent Main Turbine trip is complicated by the Reactor failing to trip and a High Pressure Turbine Stop Valve remaining open. Additionally, a loss of Condenser vacuum occurs necessitating Reactor Coolant System temperature control using the Atmospheric Dump Valves.
The inadvertent Main Turbine trip is complicated by the Reactor failing to trip and a High Pressure Turbine Stop Valve remaining open. Additionally, a loss of Condenser vacuum occurs necessitating Reactor Coolant System temperature control using the Atmospheric Dump Valves.
The event is terminated when actions for High Pressure Safety Injection Throttle/Stop are performed per EOI SO23-12-2 or EOI SO23-12-11, EOI Supporting Attachments in order to prevent overfilling of the Pressurizer.  
The event is terminated when actions for High Pressure Safety Injection Throttle/Stop are performed per EOI SO23-12-2 or EOI SO23-12-11, EOI Supporting Attachments in order to prevent overfilling of the Pressurizer.
Risk Significance:
* Risk important components out of service:            None
* Failure of risk important system prior to trip:      Loss of Train B Component Cooling Water
* Risk significant core damage sequence:              Inadvertent Turbine trip without Reactor trip
* Risk significant operator actions:                  Transfer CCW Non-Critical Loop Manually Trip the Reactor Perform HPSI Throttle/Stop SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc


Risk Significance:
Scenario Event Description NRC Scenario 5 SONGS 2009 Facility NRC Initial License Examination Simulator Scenario Setup Machine Operator: EXECUTE IC #225 and NRC Scenario #5 SETUP file to align components.
Risk important components out of service:  None Failure of risk important system prior to trip: Loss of Train B Component Cooling Water Risk significant core damage sequence: Inadvertent Turbine trip without Reactor trip Risk significant operator actions: Transfer CCW Non-Critical Loop Manually Trip the Reactor Perform HPSI Throttle/Stop Scenario Event Description NRC Scenario 5 SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc SONGS 2009 Facility NRC Initial License Examination Simulator Scenario Setup Machine Operator: EXECUTE IC #225 and NRC Scenario #5 SETUP file to align components. HANG Control Board Tags on P-054. CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario born concentration. RESET CVCS Batch Counters to zero (0). VERIFY both Pressurizer Spray Valves in AUTO. ENSURE Train B Component Cooling Water Pump (P-026) in service.
HANG Control Board Tags on P-054.
CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario born concentration.
RESET CVCS Batch Counters to zero (0).
VERIFY both Pressurizer Spray Valves in AUTO.
ENSURE Train B Component Cooling Water Pump (P-026) in service.
ENSURE CEAC #2 in service.
ENSURE CEAC #2 in service.
ENSURE Channel Y Pressurizer Pressure and Pressurizer Level in service. PLACE procedures in progress on the RO desk: - Copy of SO23-5-1.7, Power Operations open to Section 6.1, Guidelines for Steady State Operation. PLACE the BOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board. If Group Position(s) is (are) not correct, MOVE CEAs and then RETURN CEAs to Shift Turnover Sheet position (Group 6 @ 137 / PLCEAs @ 115).
ENSURE Channel Y Pressurizer Pressure and Pressurizer Level in service.
Control Room Annunciators in Alarm
PLACE procedures in progress on the RO desk:
: None  
                  - Copy of SO23-5-1.7, Power Operations open to Section 6.1, Guidelines for Steady State Operation.
PLACE the BOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board.
If Group Position(s) is (are) not correct, MOVE CEAs and then RETURN CEAs to Shift Turnover Sheet position (Group 6 @ 137 / PLCEAs @ 115).
Control Room Annunciators in Alarm:
None SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 1 Page 4 of 17 Event
Appendix D                                         Operator Action                           Form ES-D-2 Operating Test :       NRC         Scenario #     5     Event #             1       Page 4   of 17 Event


== Description:==
== Description:==
Train B Salt Water Cooling Pump Seized Shaft Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc Machine Operator: When directed, EXECUTE Event 1. - SC01D, Salt Water Cooling Pump P-114 seized shaft.
Train B Salt Water Cooling Pump Seized Shaft Time         Position                             Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 1.
Indications Available
                          - SC01D, Salt Water Cooling Pump P-114 seized shaft.
: 64A24 - SWC PUMP MOTOR BRG TEMP HI 64A43 - SWC PUMP TRAIN B OC 64A20 - SWC TRAIN B FLOW HI/LO 64A60 - SWC TRAIN B FLOW TROUBLE  
Indications Available:
64A24 - SWC PUMP MOTOR BRG TEMP HI 64A43 - SWC PUMP TRAIN B OC 64A20 - SWC TRAIN B FLOW HI/LO 64A60 - SWC TRAIN B FLOW TROUBLE Salt Water Cooling Pump P-114 tripped indication
+30 secs          BOP      REFER to Annunciator Response Procedures.
DETERMINE that SWC P114 has tripped and INFORM the CRS that entry BOP into SO23-13-7 is required.
CRS      DIRECT performance of AOI SO23-13-7, Loss of CCW/SWC.
CRS      DIRECT transfer of CCW to Train A.
START CCW Pump P024 or P025 and VERIFY that SWC Pump P112 BOP automatically starts.
BOP      ALIGN Train A CCW to Non-Critical Loop and Letdown Heat Exchanger.
CRS      DISPATCH operators to CHECK SWC Pump P114 and associated breaker.
BOP      STOP CCW Pump P026.
M.O. Cue:        When directed to investigate P114 trip, WAIT 3 minutes and then REPORT that SWC Pump P114 motor has an odor of burnt insulation.
M.O. Cue:        When directed to investigate P114 breaker, WAIT 3 minutes and then REPORT that SWC Pump P114 breaker has overcurrent flags on Phases B and C.
SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc


Salt Water Cooling Pump P-114 tripped indication
Appendix D                                        Operator Action                            Form ES-D-2 Operating Test :        NRC        Scenario #    5      Event #            1        Page 5    of 17 Event
+30 secs BOP REFER to Annunciator Response Procedures.
BOP DETERMINE that SWC P114 has tripped and INFORM the CRS that entry into SO23-13-7 is required.
CRS DIRECT performance of AOI SO23-13-7, Loss of CCW/SWC.
CRS DIRECT transfer of CCW to Train A.
BOP START CCW Pump P024 or P025 and VERIFY that SWC Pump P112


automatically starts.
== Description:==
BOP ALIGN Train A CCW to Non-Critical Loop and Letdown Heat Exchanger.
Train B Salt Water Cooling Pump Seized Shaft Time          Position                              Applicants Actions or Behavior CRS      EVALUATE Technical Specifications.
CRS DISPATCH operators to CHECK SWC Pump P114 and associated breaker.
* LCO 3.7.8.A - Saltwater Cooling System.
BOP STOP CCW Pump P026.
* CONDITION A - One SWC train INOPERABLE.
M.O. Cue: When directed to investigate P114 trip, WAIT 3 minutes and then REPORT that SWC Pump P114 motor has an odor of burnt insulation.
* ACTION A - Restore SWC Train to OPERABLE status within 72 hours.
M.O. Cue: When directed to investigate P114 breaker, WAIT 3 minutes and then REPORT that SWC Pump P114 breaker has overcurrent flags on Phases B and C.  
Examiner Note:          The crew may decide to place CCW Pump P026 OOS, swap CCW Pump P025 to Train B, and/or place Train B HPSI and CS Pumps OOS. Crew may remove DC Control Power for Train B HPSI and CS pumps to avoid damage due to lack of cooling water.
M.O. Cue:       Due to time restrictions, ACKNOWLEDGE, but do NOT perform, the following system alignments:
* If directed to open the DC power supply breaker for CCW Pumps P026, ACKNOWLEDGE the order but do not perform.
* If directed to transfer Emergency Chiller E-336 to Unit 3, ACKNOWLEDGE the order but do not perform.
* If directed to transfer CCW Pump P025 or transfer HPSI Pump P018 from Train A to Train B, ACKNOWLEDGE the order but do not perform.
+10 min          CRS      ENSURE ECCS is not required.
* HPSI, LPSI, CS pumps are stopped.
When Train A CCW is aligned to the NCL and the Letdown Heat Exchanger, and Technical Specifications have been addressed, or at Lead Evaluators discretion, PROCEED to Event 2.
SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 1 Page 5 of 17 Event
Appendix D                                           Operator Action                           Form ES-D-2 Operating Test :       NRC         Scenario #       5       Event #           2        Page 6    of 17 Event


== Description:==
== Description:==
Train B Salt Water Cooling Pump Seized Shaft Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc CRS EVALUATE Technical Specifications.
Pressurizer Pressure Controlling Channel Fails Low Time         Position                                 Applicants Actions or Behavior Machine Operator:          When directed, EXECUTE Event 2.
LCO 3.7.8.A - Saltwater Cooling System.
                          - RC15B, Pressurizer Pressure Controlling Channel PT-0100Y fails low.
CONDITION A - One SWC train INOPERABLE. ACTION A - Restore SWC Train to OPERABLE status within 72 hours. Examiner Note:  The crew may decide to place CCW Pump P026 OOS, swap CCW Pump P025 to Train B, and/or place Train B HPSI and CS Pumps OOS. Crew may remove DC Control Power for Train B HPSI and CS pumps to avoid damage due to lack of cooling water.
Indications Available:
M.O. Cue: Due to time restrictions, ACKNOWLEDGE, but do NOT perform, the following system alignments:  If directed to open the DC power supply breaker for CCW Pumps P026, ACKNOWLEDGE the order but do not perform. If directed to transfer Emergency Chiller E-336 to Unit 3, ACKNOWLEDGE the
50A04 - PZR PRESS DEVIATION HI / LO 50A14 - PZR PRESS HI / LO
+30 secs        RO        REFER to Annunciator Response Procedures.
RO        DETERMINE which channel initiated the alarm using PR-100.
* RECOGNIZE Channel Y (PR-0100B) has failed low and INFORM CRS that AOI SO23-13-27 entry required.
If desired, SELECT PIC-100 to MANUAL and return pressure to the normal RO band and ENSURE heaters energized and PZR pressure trending to normal.
DIRECT performance of AOI SO23-13-27, Pressurizer Pressure and Level CRS Malfunction.
RO        VERIFY PI-0100X is OPERABLE.
POSITION HS-0100A, Pressurizer Pressure Channel Select Switch to RO Channel X per ARP or AOI.
RO        RESTORE PZR heaters to normal configuration as required.
* PLACE heater control switches to OFF, then AUTO.
RO        VERIFY normal Charging and Letdown in service.
SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc


order but do not perform. If directed to transfer CCW Pump P025 or transfer HPSI Pump P018 from Train
Appendix D                                           Operator Action                           Form ES-D-2 Operating Test :       NRC       Scenario #       5       Event #           2       Page 7    of 17 Event
 
A to Train B, ACKNOWLEDGE the order but do not perform.
+10 min CRS ENSURE ECCS is not required.
HPSI, LPSI, CS pumps are stopped.
When Train A CCW is aligned to the NCL and the Letdown Heat Exchanger, and Technical Specifications have been addressed, or at Lead Evaluator's discretion, PROCEED to Event 2.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 2 Page 6 of 17 Event


== Description:==
== Description:==
Pressurizer Pressure Controlling Channel Fails Low Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc Machine Operator: When directed, EXECUTE Event 2. - RC15B, Pressurizer Pressure Controlling Channel PT-0100Y fails low.
Pressurizer Pressure Controlling Channel Fails Low Time         Position                                 Applicants Actions or Behavior Examiner Note: RCS Pressure must rise above 2275 psia to make this Technical Specification call.
Indications Available
  +10 min          CRS      EVALUATE Technical Specifications.
: 50A04 - PZR PRESS DEVIATION HI / LO 50A14 - PZR PRESS HI / LO
* LCO 3.4.1.A, RCS DNB Limits.
  +30 secs RO REFER to Annunciator Response Procedures.
* CONDITION A - Pressurizer pressure or RCS flow rate not within limits.
RO DETERMINE which channel initiated the alarm using PR-100.
* ACTION A.1 - Restore parameter(s) to within limit within 2 hours.
RECOGNIZE Channel Y (PR-0100B) has failed low and INFORM CRS that AOI SO23-13-27 entry required.
When Technical Specifications are addressed, or at Lead Evaluators discretion, PROCEED to Event 3.
RO If desired, SELECT PIC-100 to MANUAL and return pressure to the normal band and ENSURE heaters energized and PZR pressure trending to normal.
SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc
CRS DIRECT performance of AOI SO23-13-27, Pressurizer Pressure and Level Malfunction.
RO VERIFY PI-0100X is OPERABLE.
RO POSITION HS-0100A, Pressurizer Pressure Channel Select Switch to Channel X per ARP or AOI.
RO RESTORE PZR heaters to normal configuration as required.
PLACE heater control switches to OFF, then AUTO.
RO VERIFY normal Charging and Letdown in service.  


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 2 Page 7 of 17 Event
Appendix D                                         Operator Action                             Form ES-D-2 Operating Test :       NRC         Scenario #     5         Event #           3        Page 8    of 17 Event


== Description:==
== Description:==
Pressurizer Pressure Controlling Channel Fails Low Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc Examiner NoteRCS Pressure must rise above 2275 psia to make this Technical Specification call. +10 min CRS EVALUATE Technical Specifications.
Control Element Assembly Calculator Failure Time         Position                               Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 3.
LCO 3.4.1.A, RCS DNB Limits.
                          - RP18, Control Element Assembly Calculator #2 failure.
CONDITION A - Pressurizer pressure or RCS flow rate not within limits. ACTION A.1 - Restore parameter(s) to within limit within 2 hours.
Indications Available:
When Technical Specifications are addressed, or at Lead Evaluator's discretion, PROCEED to Event 3.
56C42 - CEAC 2 FAILURE
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 3 Page 8 of 17 Event
  +30 secs          RO        REFER to Annunciator Response Procedures.
RO        SELECT CEAC #1 to display on the CEA-CRT to verify failure.
DETERMINE CEAC #2 failure and INFORM the CRS SO23-3-2.13, Core RO Protection / Control Element Assembly Calculator Operation entry required.
DIRECT performance of SO23-3-2.13, Section for CEAC/RSPT Erratic or CRS INOP.
DETERMINE failure has NOT reset by DEPRESSING the CEAC Fail RO Indicator Pushbutton on the ROM Channel C.
Floor Cue:        Once the actions of the ARP are complete, DIRECT the CRS to evaluate Technical Specifications. Do not allow the CRS to change the addressable constants for the INOP CEAC due to time constraints.
PERFORM CEA Verification once per 4 hours per SO23-3-3.25 Section for RO Reactivity Control Systems.
RO        NOTIFY the Computer Technician to investigate the CEAC Channel failure.
RO        ENSURE the CEA-CRT is displaying CEAC #1.
SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc
 
Appendix D                                         Operator Action                             Form ES-D-2 Operating Test :       NRC       Scenario #       5         Event #           3       Page 9    of 17 Event


== Description:==
== Description:==
Control Element Assembly Calculator Failure Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc Machine Operator: When directed, EXECUTE Event 3. - RP18, Control Element Assembly Calculator #2 failure.
Control Element Assembly Calculator Failure Time         Position                               Applicants Actions or Behavior
Indications Available
+10 min          CRS      EVALUATE Technical Specifications.
: 56C42 - CEAC 2 FAILURE
* LCO 3.3.3.A, Control Element Assembly Calculator (CEAC).
+30 secs RO REFER to Annunciator Response Procedures.
* CONDITION A - One CEAC inoperable.
RO SELECT CEAC #1 to display on the CEA-CRT to verify failure.
* ACTION A.1 - Perform CEA Verification once per 4 hours, and
RO DETERMINE CEAC #2 failure and INFORM the CRS SO23-3-2.13, Core Protection / Control Element Assembly Calculator Operation entry required.
* ACTION A.2 - Restore CEAC to OPERABLE status within 7 days.
CRS DIRECT performance of SO23-3-2.13, Section for CEAC/RSPT Erratic or
When Technical Specifications are addressed, or at Lead Evaluators discretion, PROCEED to Events 4, 5, 6, 7, and 8.
SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc


INOP. RO DETERMINE failure has NOT reset by DEPRESSING the CEAC Fail Indicator Pushbutton on the ROM Channel C.
Appendix D                                               Operator Action                                   Form ES-D-2 Operating Test :       NRC           Scenario #       5       Event #       4, 5, 6, 7, & 8  Page     10      of     17 Event
Floor Cue:  Once the actions of the ARP are complete, DIRECT the CRS to evaluate Technical Specifications. Do not allow the CRS to change the addressable constants for the INOP CEAC due to time constraints.
RO PERFORM CEA Verification once per 4 hours per SO23-3-3.25 Section for Reactivity Control Systems.
RO NOTIFY the Computer Technician to investigate the CEAC Channel failure.
RO ENSURE the CEA-CRT is displaying CEAC #1.
 
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 3 Page 9 of 17 Event


== Description:==
== Description:==
Control Element Assembly Calculator Failure Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc
Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time         Position                                   Applicants Actions or Behavior Machine Operator:            When directed, EXECUTE Events 4, 5, 6, 7, and 8.
  +10 min CRS EVALUATE Technical Specifications.
                            - FW09B, Inadvertent Turbine trip.
LCO 3.3.3.A, Control Element Assembly Calculator (CEAC).
                            - RP15, Automatic Reactor trip failure.
CONDITION A - One CEAC inoperable. ACTION A.1 - Perform CEA Verification once per 4 hours, and  ACTION A.2 - Restore CEAC to OPERABLE status within 7 days.
                            - TC02E, HP Turbine Stop Valve fails to close.
When Technical Specifications are addressed, or at Lead Evaluator's discretion, PROCEED to Events 4, 5, 6, 7, and 8.
                            - RC18A, Pressurizer Safety Valve fails open upon Reactor trip.
                            - FW23, Loss of Condenser Vacuum.
Indications Available:
99A24 - TURBINE TRIP RELAY TRIPPED 99B01 - GENERATOR TRIP
  +10 secs      RO/BOP        RECOGNIZE inadvertent Turbine trip without a corresponding Reactor trip.
Manually trip the Reactor due to Reactor Protection System failure, within one CRITICAL TASK              (1) minute of Reactor Trip criteria being exceeded.
STATEMENT Elapsed Time: __________
CRITICAL TASK RO/BOP        MANUALLY TRIP the Reactor.
VERIFY Reactor trip and DIRECT crew to perform actions of SO23-12-1, CRS Standard Post Trip Actions.
RO          VERIFY Reactor Trip:
* DETERMINE only 4 Reactor Trip Circuit Breakers open.
* VERIFY Reactor Power lowering and Startup Rate negative.
* VERIFY maximum of one full length CEA NOT fully inserted.
CRS        VERIFY Reactivity Control criteria satisfied.
M.O. Cue:        VERIFY malfunction TC02E deleted when manual Turbine trip is performed.
BOP        DETERMINE Turbine tripped with HV-2200E, Governor OPEN.
BOP
* MANUALLY TRIP Main Turbine.
* DETERMINE HP Turbine Stop Valve HV-2200E NOT closed.
* VERIFY both Unit Output Breakers open.
SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 4, 5, 6, 7, & 8 Page 10 of 17 Event
Appendix D                                               Operator Action                                   Form ES-D-2 Operating Test :       NRC           Scenario #       5       Event #       4, 5, 6, 7, & 8   Page     11      of     17 Event


== Description:==
== Description:==
Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc Machine Operator: When directed, EXECUTE Events 4, 5, 6, 7, and 8. - FW09B, Inadvertent Turbine trip. - RP15, Automatic Reactor trip failure.  
Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time         Position                                   Applicants Actions or Behavior
- TC02E, HP Turbine Stop Valve fails to close. - RC18A, Pressurizer Safety Valve fails open upon Reactor trip. - FW23, Loss of Condenser Vacuum.
* VERIFY Main Turbine speed < 2000 RPM or lowering.
Indications Available
CRS        INITIATE Administrative Actions:
: 99A24 - TURBINE TRIP RELAY TRIPPED 99B01 - GENERATOR TRIP
* ANNOUNCE Reactor trip via PA System.
+10 secs RO/BOP RECOGNIZE inadvertent Turbine trip without a corresponding Reactor trip.
* INITIATE Attachment 4, Worksheet.
CRITICAL TASK STATEMENT Manually trip the Reactor due to Reactor Protection System failure, within one (1) minute of Reactor Trip criteria being exceeded. Elapsed Time: __________
* INITIATE Attachment 5, Administrative Actions.
CRITICAL TASK RO/BOP MANUALLY TRIP the Reactor.
BOP       VERIFY Vital Auxiliaries criteria satisfied:
CRS VERIFY Reactor trip and DIRECT crew to perform actions of SO23-12-1, Standard Post Trip Actions.
* VERIFY both 1E 4 kV Buses A04 and A06 energized.
RO VERIFY Reactor Trip:
* VERIFY both 1E 480 V Buses B04 and B06 energized.
DETERMINE only 4 Reactor Trip Circuit Breakers open.
* VERIFY all 1E DC Buses energized.
VERIFY Reactor Power lowering and Startup Rate negative.
* VERIFY all Non-1E 4 kV Buses energized.
VERIFY maximum of one full length CEA NOT fully inserted.
* VERIFY CCW Train operating AND aligned to Non-Critical Loop and Letdown Heat Exchanger.
CRS VERIFY Reactivity Control criteria satisfied.
RO        VERIFY RCS Inventory Control criteria satisfied:
M.O. Cue: VERIFY malfunction TC02E deleted when manual Turbine trip is performed.
* VERIFY PZR level between 10% and 70% AND trending to between 30% and 60%.
BOP DETERMINE Turbine tripped with HV-2200E, Governor OPEN.
* VERIFY Core Exit Saturation Margin > 20&deg;F:
BOP  MANUALLY TRIP Main Turbine.
* QSPDS page 611.
DETERMINE HP Turbine Stop Valve HV-2200E NOT closed.
* CFMS page 311.
VERIFY both Unit Output Breakers open.
Examiner Note:           Depending upon the time that RCS Pressure Control criteria is verified, this Safety Function may or may not be met. RCS pressure will drop to the SIAS setpoint and then the Pressurizer Safety Valve will close. RCS pressure will then rise due to three Charging Pumps in operation. This could also dictate whether the CRS enters SO23-12-3, LOCA or SO23-12-2, Reactor Trip Recovery.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 4, 5, 6, 7, & 8 Page 11 of 17 Event
RO        VERIFY RCS Pressure Control criteria satisfied:
* VERIFY PZR pressure between 1740 PSIA and 2380 PSIA AND trending to between 2025 PSIA and 2275 PSIA.
SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc
 
Appendix D                                               Operator Action                                   Form ES-D-2 Operating Test :       NRC           Scenario #       5       Event #       4, 5, 6, 7, & 8   Page     12      of     17 Event


== Description:==
== Description:==
Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc VERIFY Main Turbine speed < 2000 RPM or lowering.
Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time         Position                                   Applicants Actions or Behavior RO        VERIFY Core Heat Removal criteria is satisfied:
CRS INITIATE Administrative Actions:
* VERIFY at least one RCP operating.
ANNOUNCE Reactor trip via PA System.
* VERIFY core loop T less than 10&deg;F.
INITIATE Attachment 4, Worksheet.
* VERIFY Core Exit Saturation Margin > 20&deg;F.
INITIATE Attachment 5, Administrative Actions.
* QSPDS page 611.
BOP VERIFY Vital Auxiliaries criteria satisfied:
* CFMS page 311.
VERIFY both 1E 4 kV Buses A04 and A06 energized.
BOP        VERIFY RCS Heat Removal criteria satisfied:
VERIFY both 1E 480 V Buses B04 and B06 energized.
* VERIFY at least one SGs level between 21% and 80% NR and Auxiliary Feedwater available.
VERIFY all 1E DC Buses energized.
                                  *      [RNO] ENSURE EFAS actuated.
VERIFY all Non-1E 4 kV Buses energized.
* VERIFY heat removal is adequate.
VERIFY CCW Train operating AND aligned to Non-Critical Loop and Letdown Heat Exchanger.
* VERIFY Tcold trending to between 545&deg;F and 555&deg;F.
RO VERIFY RCS Inventory Control criteria satisfied:
* VERIFY SG pressures approximately 1000 PSIA.
VERIFY PZR level between 10% and 70% AND trending to between 30% and 60%.
RECOGNIZE loss of Condenser vacuum and place Atmospheric Dump BOP Valves in service.
VERIFY Core Exit Saturation Margin > 20&deg;F:
RO        VERIFY Containment Isolation criteria satisfied:
QSPDS page 611.
* VERIFY Containment pressure < 1.5 PSIG.
CFMS page 311.
* VERIFY Containment Area Radiation Monitors energized AND NOT RO alarming or trending to alarm.
Examiner Note: Depending upon the time that RCS Pressure Control criteria is verified, this Safety Function may or may not be met. RCS pressure will drop to the SIAS setpoint and then the Pressurizer Safety Valve will close. RCS pressure will then rise due to three Charging Pumps in operation. This could also dictate whether the CRS enters SO23-12-3, LOCA or SO23-12-2, Reactor Trip Recovery.
* VERIFY Secondary Plant Radiation Monitors energized AND NOT alarming or trending to alarm.
RO VERIFY RCS Pressure Control criteria satisfied:
RO         VERIFY Containment Temperature and Pressure criteria satisfied:
VERIFY PZR pressure between 1740 PSIA and 2380 PSIA AND trending to between 2025 PSIA and 2275 PSIA.  
* VERIFY Containment average temperature < 120&deg;F.
* VERIFY Containment pressure < 1.5 PSIG.
SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 4, 5, 6, 7, & 8 Page 12 of 17 Event
Appendix D                                               Operator Action                                   Form ES-D-2 Operating Test :       NRC           Scenario #       5       Event #       4, 5, 6, 7, & 8   Page     13      of     17 Event


== Description:==
== Description:==
Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc RO VERIFY Core Heat Removal criteria is satisfied:
Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time         Position                                   Applicants Actions or Behavior Examiner Note:          The CRS will either diagnose a LOCA inside Containment and enter SO23-12-3, LOCA or recognize that all Safety Function Criteria have been met and enter SO23-12-2, Reactor Trip Recovery. Either procedure entry is acceptable because both will yield Safety Injection Throttle / Stop actions.
VERIFY at least one RCP operating.
CRS        DIAGNOSE event in progress:
VERIFY core loop T less than 10&deg;F.
* DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.
VERIFY Core Exit Saturation Margin > 20&deg;F.
                                  *    [RNO] COMPLETE Attachment 1, Recovery Diagnostics.
QSPDS page 611.
                                  *    [RNO] DIAGNOSE event as LOCA inside Containment or Reactor Trip Recovery.
CFMS page 311.
                                  *    [RNO] If LOCA inside Containment is diagnosed, ENSURE at least one RCP in the each loop stopped.
BOP VERIFY RCS Heat Removal criteria satisfied:
* DIRECT initiating Steps 12 through 15.
VERIFY at least one SGs level between 21% and 80% NR and Auxiliary Feedwater available.
BOP       INITIATE Steps 12 through 15.
[RNO] ENSURE EFAS actuated.
Examiner Note:          The following steps are from SO23-12-3, Loss of Coolant Accident.
VERIFY heat removal is adequate.
If SO23-12-2, Reactor Trip Recovery is selected it is addressed later in this scenario.
VERIFY T cold trending to between 545&deg;F and 555&deg;F.
CRS        DIRECT performance of SO23-12-3, LOCA.
VERIFY SG pressures approximately 1000 PSIA.
* RECORD time of EOI entry __________.
BOP RECOGNIZE loss of Condenser vacuum and place Atmospheric Dump Valves in service.
+15 min            CRS        VERIFY LOCA diagnosis:
RO VERIFY Containment Isolation criteria satisfied:
* INITIATE SO23-12-10, Safety Function Status Checks.
VERIFY Containment pressure < 1.5 PSIG.
* INITIATE Foldout Page.
RO  VERIFY Containment Area Radiation Monitors energized AND NOT alarming or trending to alarm.
* DIRECT performance of FS-7, Verify SI Throttle/Stop Criteria.
VERIFY Secondary Plant Radiation Monitors energized AND NOT alarming or trending to alarm.
* DIRECT performance of Attachment 22, Non-Qualified Load Restoration.
RO VERIFY Containment Temperature and Pressure criteria satisfied:
* VERIFY LOCA diagnosis, using Figure 1, Break Identification Chart.
VERIFY Containment average temperature < 120&deg;F.
* INITIATE sampling of both Steam Generators for radioactivity and boron.
VERIFY Containment pressure < 1.5 PSIG.  
SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 4, 5, 6, 7, & 8 Page 13 of 17 Event
Appendix D                                               Operator Action                                   Form ES-D-2 Operating Test :         NRC           Scenario #       5       Event #       4, 5, 6, 7, & 8   Page     14      of     17 Event


== Description:==
== Description:==
Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc Examiner Note: The CRS will either diagnose a LOCA inside Containment and enter  SO23-12-3, LOCA or recognize that all Safety Function Criteria have been met and enter SO23-12-2, Reactor Trip Recovery. Either procedure entry is acceptable because both will yield Safety Injection Throttle / Stop actions.
Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time         Position                                     Applicants Actions or Behavior M.O. Cue:         If directed to sample SGs, WAIT 5 minutes and then REPORT that E088 and E089 both have activity near background, and normal boron levels. If the SG sample valves are closed, REPORT unable to establish sample flow.
CRS DIAGNOSE event in progress:
M.O. Cue:        When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored Non-Qualified Loads.
DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.
CRS        INITIATE Administrative actions:
[RNO] COMPLETE Attachment 1, Recovery Diagnostics.
* NOTIFY Shift Manager/Operations Leader of SO23-12-3, Loss of Coolant Accident initiation.
[RNO] DIAGNOSE event as LOCA inside Containment or Reactor Trip Recovery.
* ENSURE Emergency Plan is initiated.
[RNO] If LOCA inside Containment is diagnosed, ENSURE at least one RCP in the each loop stopped.
* IMPLEMENT Placekeeper.
DIRECT initiating Steps 12 through 15.
RO        DETERMINE ESF actuation NOT required.
BOP INITIATE Steps 12 through 15.
* DETERMINE Pressurizer pressure is greater than SIAS setpoint and Containment pressure is less than 3.4 psig.
Examiner Note: The following steps are from SO23-12-3, Loss of Coolant Accident. If SO23-12-2, Reactor Trip Recovery is selected it is addressed later in this scenario.
CRS        TRANSITION to Step 7.
CRS DIRECT performance of SO23-12-3, LOCA.
CRS         INITIATE applicable actions of SO23-12-11, Attachment 2, Floating Steps.
RECORD time of EOI entry __________.  
RO        DETERMINE FS-7, VERIFY SI Throttle/Stop Criteria satisfied.
+15 min CRS VERIFY LOCA diagnosis:
BOP
INITIATE SO23-12-10, Safety Function Status Checks.
* VERIFY at least one SG operating with ADVs and feedwater available.
INITIATE Foldout Page.
RO
DIRECT performance of FS-7, Verify SI Throttle/Stop Criteria.
* VERIFY Pressurizer level greater than 30% and not lowering.
DIRECT performance of Attachment 22, Non-Qualified Load Restoration.
RO
VERIFY LOCA diagnosis, using Figure 1, Break Identification Chart.
* VERIFY Core Exit Saturation Margin  20&deg;F.
INITIATE sampling of both Steam Generators for radioactivity and boron.  
RO
* VERIFY Reactor Vessel level  100% (Plenum).
CRS/RO
* VERIFY RCS cooldown not in progress.
RO
* VERIFY SI Pumps NOT operating to meet RC-3 Success Path.
Actions are taken to control Safety Injection flow rate to maintain or recover SI CRITICAL TASK Throttle / Stop criteria. Pressurizer level increase and RCS repressurization is STATEMENT stopped / controlled.
SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 4, 5, 6, 7, & 8 Page 14 of 17 Event
Appendix D                                               Operator Action                                   Form ES-D-2 Operating Test :       NRC           Scenario #       5       Event #       4, 5, 6, 7, & 8   Page     15      of     17 Event


== Description:==
== Description:==
Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc M.O. Cue:  If directed to sample SGs, WAIT 5 minutes and then REPORT that E088 and E089 both have activity near background, and normal boron levels. If the SG sample valves are closed, REPORT unable to establish sample flow.
Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time         Position                                   Applicants Actions or Behavior CRITICAL TASK RO        PERFORM SI Throttle/Stop actions.
M.O. Cue: When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored Non-Qualified Loads.
RO
CRS INITIATE Administrative actions:
* THROTTLE or STOP SI Pumps as required, one train at a time.
NOTIFY Shift Manager/Operations Leader of SO23-12-3, Loss of Coolant Accident initiation.
RO
ENSURE Emergency Plan is initiated.
* VERIFY Pressurizer level less than 80%.
IMPLEMENT Placekeeper.
RO
RO DETERMINE ESF actuation NOT required.
* VERIFY Charging Pumps NOT operating to meet RC-2 Success Path.
DETERMINE Pressurizer pressure is greater than SIAS setpoint and Containment pressure is less than 3.4 psig.
RO
CRS TRANSITION to Step 7.
* STOP Charging Pumps as required, one at a time.
CRS INITIATE applicable actions of SO 23-12-11, Attachment 2, Floating Steps.
RO
RO DETERMINE FS-7, VERIFY SI Throttle/Stop Criteria satisfied.
* MAINTAIN Throttle Stop criteria satisfied.
BOP  VERIFY at least one SG operating with ADVs and feedwater available.
RO
RO  VERIFY Pressurizer level greater than 30% and not lowering.
* VERIFY Containment pressure < 3.4 psig.
RO  VERIFY Core Exit Saturation Margin  20&deg;F. RO  VERIFY Reactor Vessel level  100% (Plenum).
RO/BOP
CRS/RO  VERIFY RCS cooldown not in progress.
* RESET SIAS per SO23-3-2.22, ESFAS Operation.
RO  VERIFY SI Pumps NOT operating to meet RC-3 Success Path.
Examiner Note:           The following steps are from SO23-12-2, Reactor Trip Recovery.
CRITICAL TASK STATEMENT Actions are taken to control Safety Injection flow rate to maintain or recover SI Throttle / Stop criteria. Pressurizer level increase and RCS repressurization is stopped / controlled.  
CRS        DIRECT performance of SO23-12-2, Reactor Trip Recovery.
* ENSURE SO23-12-1, Standard Post Trip Actions Steps 1 through 11 complete.
* RECORD time of EOI entry __________.
+15 min            CRS        VERIFY Reactor Trip Recovery diagnosis:
* INITIATE SO23-12-10, LOCA Safety Function Status Checks.
CRS       INITIATE Administrative Actions:
* NOTIFY Shift Manager/Operations Leader of SO23-12-2, Reactor Trip Recovery initiation.
* ENSURE Emergency Plan is initiated.
* IMPLEMENT Placekeeper.
RO         VERIFY Reactivity Control.
* VERIFY a maximum of one full length CEA NOT fully inserted.
SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 4, 5, 6, 7, & 8 Page 15 of 17 Event
Appendix D                                               Operator Action                                   Form ES-D-2 Operating Test :       NRC           Scenario #       5       Event #       4, 5, 6, 7, & 8   Page     16      of     17 Event


== Description:==
== Description:==
Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc CRITICAL TASK RO PERFORM SI Throttle/Stop actions.
Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time         Position                                   Applicants Actions or Behavior RO        ESTABLISH Pressurizer Level Control:
RO THROTTLE or STOP SI Pumps as required, one train at a time.
* VERIFY Pressurizer level between 10% and 70% and trending to between 30% and 60%.
RO VERIFY Pressurizer level less than 80%.
RO        ESTABLISH Pressurizer Pressure Control:
RO VERIFY Charging Pumps NOT operating to meet RC-2 Success Path.
* VERIFY Pressurizer pressure between 1740 PSIA and 2380 PSIA and trending to between 2025 PSIA and 2275 PSIA.
RO STOP Charging Pumps as required, one at a time.
RO        DETERMINE SIAS actuated:
RO MAINTAIN Throttle Stop criteria satisfied.
* INITIATE Attachment 2, SI Throttle/Stop actions.
RO VERIFY Containment pressure < 3.4 psig.
RO        DETERMINE FS-7, VERIFY SI Throttle/Stop Criteria satisfied.
RO/BOP  RESET SIAS per SO23-3-2.22, ESFAS Operation.
BOP
Examiner Note: The following steps are from SO23-12-2, Reactor Trip Recovery.
* VERIFY at least one SG operating with ADVs and feedwater available.
CRS DIRECT performance of SO23-12-2, Reactor Trip Recovery.
RO
ENSURE SO23-12-1, Standard Post Trip Actions Steps 1 through 11 complete.
* VERIFY Pressurizer level greater than 30% and not lowering.
RECORD time of EOI entry __________.
RO
+15 min CRS VERIFY Reactor Trip Recovery diagnosis:
* VERIFY Core Exit Saturation Margin  20&deg;F.
INITIATE SO23-12-10, LOCA Safety Function Status Checks.
RO
CRS INITIATE Administrative Actions:
* VERIFY Reactor Vessel level  100% (Plenum).
NOTIFY Shift Manager/Operations Leader of SO23-12-2, Reactor Trip Recovery initiation.
CRS/RO
ENSURE Emergency Plan is initiated.
* VERIFY RCS cooldown not in progress.
IMPLEMENT Placekeeper.
RO
RO VERIFY Reactivity Control.
* VERIFY SI Pumps NOT operating to meet RC-3 Success Path.
VERIFY a maximum of one full length CEA NOT fully inserted.  
Actions are taken to control Safety Injection flow rate to maintain or recover SI CRITICAL TASK Throttle / Stop criteria. Pressurizer level increase and RCS STATEMENT re-pressurization is stopped / controlled.
CRITICAL TASK RO         PERFORM SI Throttle/Stop actions.
RO
* THROTTLE or STOP SI Pumps as required, one train at a time.
RO
* VERIFY Pressurizer level less than 80%.
RO
* VERIFY Charging Pumps NOT operating to meet RC-2 Success Path.
RO
* STOP Charging Pumps as required, one at a time.
RO
* MAINTAIN Throttle Stop criteria satisfied.
RO
* VERIFY Containment pressure < 3.4 psig.
SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc


Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 4, 5, 6, 7, & 8 Page 16 of 17 Event
Appendix D                                               Operator Action                                   Form ES-D-2 Operating Test :       NRC           Scenario #       5       Event #       4, 5, 6, 7, & 8   Page     17      of     17 Event


== Description:==
== Description:==
Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc RO ESTABLISH Pressurizer Level Control:
Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time         Position                                   Applicants Actions or Behavior RO/BOP
VERIFY Pressurizer level between 10% and 70% and trending to between 30% and 60%.
* RESET SIAS per SO23-3-2.22, ESFAS Operation.
RO ESTABLISH Pressurizer Pressure Control:
BOP       STOP unloaded Diesel Generators.
VERIFY Pressurizer pressure between 1740 PSIA and 2380 PSIA and trending to between 2025 PSIA and 2275 PSIA.
BOP       INITIATE Attachment 3, Non-Qualified Load Restoration.
RO DETERMINE SIAS actuated:
M.O. Cue:         When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored Non-Qualified Loads.
INITIATE Attachment 2, SI Throttle/Stop actions.
VERIFY PZR pressure above RCP NPSH requirements of SO23-12-11, RO Attachment 29.
RO DETERMINE FS-7, VERIFY SI Throttle/Stop Criteria satisfied.
CRS/RO       VERIFY Core Exit Saturation Margin above 160&deg;F.
BOP VERIFY at least one SG operating with ADVs and feedwater available.
+30 min         CRS/RO       VERIFY Core Exit Saturation Margin above 80&deg;F.
RO  VERIFY Pressurizer level greater than 30% and not lowering.
When Core Exit Saturation Margin is verified, or at Lead Evaluators discretion, TERMINATE the scenario.
RO  VERIFY Core Exit Saturation Margin  20&deg;F. RO  VERIFY Reactor Vessel level  100% (Plenum).
SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc
CRS/RO  VERIFY RCS cooldown not in progress.
RO  VERIFY SI Pumps NOT operating to meet RC-3 Success Path.
CRITICAL TASK STATEMENT Actions are taken to control Safety Injection flow rate to maintain or recover SI Throttle / Stop criteria. Pressurizer level increase and RCS re-pressurization is stopped / controlled.
CRITICAL TASK RO PERFORM SI Throttle/Stop actions.
RO  THROTTLE or STOP SI Pumps as required, one train at a time.
RO  VERIFY Pressurizer level less than 80%.
RO  VERIFY Charging Pumps NOT operating to meet RC-2 Success Path.
RO  STOP Charging Pumps as required, one at a time.
RO  MAINTAIN Throttle Stop criteria satisfied.
RO  VERIFY Containment pressure < 3.4 psig.
Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 4, 5, 6, 7, & 8 Page 17 of 17 Event
 
== Description:==
Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time Position Applicant's Actions or Behavior SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc RO/BOP  RESET SIAS per SO23-3-2.22, ESFAS Operation.
BOP STOP unloaded Diesel Generators.
BOP INITIATE Attachment 3, Non-Qualified Load Restoration.
M.O. Cue: When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored Non-Qualified Loads.
RO VERIFY PZR pressure above RCP NPSH requirements of SO23-12-11, Attachment 29.
CRS/RO VERIFY Core Exit Saturation Margin above 160&deg;F.  
+30 min CRS/RO VERIFY Core Exit Saturation Margin above 80&deg;F.
When Core Exit Saturation Margin is verified, or at Lead Evaluator's discretion, TERMINATE  
 
the scenario.  
 
ES-301 Transient and Event Checklist Form ES-301-5 NUREG 1021 Revision 9.1 Page 1 of 3 SONGS Oct 2009 NRC ES-301-5 Transient and Event Checklist Rev 1.doc Facility: SONGS 2 and 3 Date of Exam: 10/19/09 Operating Test No.: NRC SCENARIOS SONGS #1 SONGS #2 SONGS #3 SONGS #4 CREW POSITION CREW POSITION CREW POSITION CREW POSITION MINIMUM(*)
A P P L I C A N T E V E N T  T Y P
E S R O A T C B O P S R O A T C B O P S R O A T C B O P S R O A T C B O P T O T A L R I U RX -  -  -  -  0 1 1 0 NOR 4  3 1  1  2 1 1 1 I/C 1,2,3, 5  1,2,4 2,3,4, 5  2,3,4, 5  7 4 4 2 MAJ 6  5,6 6  6  3 2 2 1  SROU 1,2 TS 1,3  1,4 2,4  3,5  4 0 2 2 RX - 4  - 3  - 1  - 1  1 1 1 0 NOR 4 -  3 -  1 -  1 -  1 1 1 1 I/C 1,2,3, 5 3,5,8  1,2,4 4,8  2,3,4, 5 3,4,7 2,3,4, 5 2,7  6 4 4 2 MAJ 6 6  5,6 5,6  6 6  6 6  3 2 2 1  SROI 1,2,3 TS 1,3 -  1,4 -  2,4 -  3,5 -  2 0 2 2 RX  4 -  3 -  1 -  1 - 1 1 1 0 NOR  - 4  - 3  - 1  - 1 1 1 1 1 I/C  3,5,8 2,3,7  4,8 2,4,7 3,4,7 4,5,8 2,7 3,4 5 4 4 2 MAJ  6 6  5,6 5,6  6 6  6 6 3 2 2 1  RO 2 TS  - -  - -  - -  - - 0 0 2 2  Instructions:
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)" and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
: 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.


ES-301 Transient and Event Checklist Form ES-301-5 NUREG 1021 Revision 9.1 Page 2 of 3 SONGS Oct 2009 NRC ES-301-5 Transient and Event Checklist Rev 1.doc Facility: SONGS 2 and 3 Date of Exam: 10/19/09 Operating Test No.: NRC SCENARIOS SONGS #1 SONGS #2 SONGS #3 SONGS #4 CREW POSITION CREW POSITION CREW POSITION CREW POSITION MINIMUM(*)
ES-301                                       Transient and Event Checklist                                     Form ES-301-5 Facility:     SONGS 2 and 3                             Date of Exam:       10/19/09         Operating Test No.:   NRC A            E SCENARIOS P            V P            E SONGS #1             SONGS #2             SONGS #3             SONGS #4 L            N T      MINIMUM(*)
A P P L I C A N T E V E N T  T Y P E S R O A T C B O P S R O A T C B O P S R O A T C B O P S R O A T C B O T O T A L R I U RX -   -   -   -   0 1 1 0 NOR 4   3   1   1   2 1 1 1 I/C 1,2,3, 1,2,4   2,3,4, 2,3,4, 7 4 4 2 MAJ 6   5,6   6 6   3 2 2 1   SROU 3 TS 1,3   1,4   2,4 3,5   4 0 2 2 RX - 4 - 3 - 1 - 1 1 1 1 0 NOR 4 - 3 - 1 - 1 - 2 1 1 1 I/C 1,2,3, 5 3,5,8 1,2,4 4,8 2,3,4, 5 3,4,7 2,3,4, 5 2,7 10 4 4 2 MAJ 6 6 5,6 5,6 6 6 6 6 4 2 2 1   SROI 4,5 TS 1,3 - 1,4 - 2,4 - 3,5 - 4 0 2 2 RX 4 - 3 - 1 - 1 - 1 1 1 0 NOR - 4 - 3 - 1 - 1 2 1 1 1 I/C 3,5,8 2,3,7 4,8 2,4,7 3,4,7 4,5,8 2,7 3,4 9 4 4 2 MAJ 6 6 5,6 5,6 6 6 6 6 4 2 2 1   RO 5,7 TS - - - - - - - - 0 0 2 2 Instructions:
I           T CREW                CREW                  CREW                CREW          O C
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)" and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
POSITION            POSITION              POSITION              POSITION        T A           T A
: 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.  
N           Y     S     A     B     S       A       B     S       A     B     S     A    B R       T    O     R      T       O     R        T     O     R      T     O    L     R     I   U T            P E      O      C      P      O      C      P    O        C    P      O      C    P RX         -                   -                     -                     -                 0     1   1     0 NOR       4                   3                     1                     1                 2     1   1     1 SROU        I/C     1,2,3,               1,2,4                 2,3,4,               2,3,4, 7     4   4     2 5                                          5                    5 1,2 MAJ       6                   5,6                   6                     6                 3     2   2     1 TS       1,3                 1,4                   2,4                   3,5                 4     0   2     2 RX         -     4           -       3             -       1             -     1           1     1   1     0 NOR       4       -           3       -             1       -           1     -           1      1   1     1 SROI      I/C     1,2,3, 3,5,8       1,2,4   4,8         2,3,4, 3,4,7         2,3,4, 2,7 6      4   4     2 1,2,3                5                                          5                    5 MAJ       6       6           5,6     5,6           6       6           6     6           3      2   2     1 TS       1,3     -           1,4     -           2,4       -           3,5     -           2      0   2     2 RX               4     -             3       -             1     -           1     -   1     1   1     0 NOR               -     4             -       3             -     1           -     1     1      1   1     1 RO        I/C             3,5,8 2,3,7           4,8   2,4,7           3,4,7 4,5,8         2,7   3,4   5      4   4     2 2         MAJ               6     6             5,6     5,6             6     6           6     6     3      2   2     1 TS               -     -             -       -             -     -           -     -   0     0   2     2 Instructions:
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
: 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
NUREG 1021 Revision 9.1                              Page 1 of 3          SONGS Oct 2009 NRC ES-301-5 Transient and Event Checklist Rev 1.doc


ES-301 Transient and Event Checklist Form ES-301-5 NUREG 1021 Revision 9.1 Page 3 of 3 SONGS Oct 2009 NRC ES-301-5 Transient and Event Checklist Rev 1.doc Facility: SONGS 2 and 3 Date of Exam: 10/19/09 Operating Test No.: NRC SCENARIOS SONGS #1 SONGS #2 SONGS #3 SONGS #4 CREW POSITION CREW POSITION CREW POSITION CREW POSITION MINIMUM(*)
ES-301                                       Transient and Event Checklist                                     Form ES-301-5 Facility:     SONGS 2 and 3                             Date of Exam:       10/19/09         Operating Test No.:   NRC A          E SCENARIOS P          V P          E SONGS #1             SONGS #2             SONGS #3             SONGS #4 L          N T      MINIMUM(*)
A P P L I C A N T E V E N T  T Y P E S R O A T C B O P S R O A T C B O P S R O A T C B O P S R O A T C B O T O T A L R I U RX 4 - 3 - 1 - 1 - 1 1 1 0 NOR - 4 - 3 - 1 - 1 2 1 1 1 I/C 3,5,8 2,3,7  4,8 2,4,7 3,4,74,5,8 2,7 3,4 8 4 4 2 MAJ 6 6  5,6 5,6 6 6 6 6 4 2 2 1   RO 1,3 TS  - -  - -  - -  - - 0 0 2 2 RX 4 - 3 - 1 - 1 - 1 1 1 0 NOR - 4 - 3 - 1 - 1 1 1 1 1 I/C 3,5,8 2,3,7 4,8 2,4,7 3,4,7 4,5,8 2,7 3,4 6 4 4 2 MAJ  6 6  5,6 5,6  6 6  6 6 3 2 2 1  RO 4 TS  - -  - -  - -  - - 0 0 2 2 RX  4 -  3 -  1 -  1 - 1 1 1 0 NOR  - 4 - 3  - 1  - 1 2 1 1 1 I/C  3,5,8 2,3,4,8 2,4,7 3,4,74,5,8 2,7 3,4 9 4 4 2 MAJ 6 6 5,6 5,6 6 6 6 6 4 2 2 1 RO 6 TS - - - -  - -  - - 0 0 2 2 RX 4 - 3 - 1 - 1 - 1 1 1 0 NOR - 4 - 3 - 1 - 1 1 1 1 1 I/C 3,5,8 2,3,7 4,8 2,4,7 3,4,7 4,5,8 2,7 3,4 6 4 4 2 MAJ 6 6 5,6 5,6 6 6 6 6 3 2 2 1   RO 8 TS - - - - - - - - 0 0 2 2 Instructions:
I           T CREW                CREW                  CREW                CREW          O C
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)" and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
POSITION            POSITION              POSITION              POSITION        T A           T A
: 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.  
N           Y     S     A     B     S       A       B     S       A     B     S     A    B R       T    O     R      T       O     R        T     O     R      T     O    L     R     I   U T          P E      O      C      P      O      C      P    O        C    P      O      C    P RX         -                   -                     -                     -                 0    1   1     0 NOR       4                   3                     1                     1                   2     1   1     1 SROU        I/C     1,2,3,               1,2,4                 2,3,4,               2,3,4, 7    4   4     2 5                                          5                    5 3
MAJ       6                   5,6                   6                     6                   3    2   2     1 TS      1,3                  1,4                  2,4                  3,5                  4    0   2     2 RX         -      4           -       3             -       1             -     1           1     1   1     0 NOR       4       -           3       -             1       -           1     -            2    1   1     1 SROI      I/C     1,2,3,  3,5,8       1,2,4   4,8         2,3,4, 3,4,7         2,3,4, 2,7 10    4   4     2 4,5                5                                          5                    5 MAJ       6       6           5,6     5,6           6       6           6     6           4     2   2     1 TS       1,3      -           1,4      -           2,4      -           3,5    -           4    0   2     2 RX               4     -             3       -             1     -           1     -     1     1   1     0 NOR               -     4             -       3             -     1           -     1     2    1   1     1 RO        I/C             3,5,8 2,3,7           4,8   2,4,7           3,4,7 4,5,8         2,7   3,4     9    4   4     2 5,7      MAJ               6     6             5,6     5,6             6     6           6     6     4    2   2     1 TS               -     -             -       -             -     -           -     -     0     0   2     2 Instructions:
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
: 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
NUREG 1021 Revision 9.1                              Page 2 of 3          SONGS Oct 2009 NRC ES-301-5 Transient and Event Checklist Rev 1.doc


ES-301 Competencies Checklist Form ES-301-6 NUREG-1021, Revision 9.1 SONGS Oct 2009 ES-301-6 Rev 0 Facility: SONGS Date of Examination: 10/19/09 Operating Test No. NRC 1-4 SRO RO (ATC) BOP SCENARIO SCENARIO SCENARIO Competencies 1 2 3 4 1 2 3 4 1 2 3 4 Interpret/Diag-nose Events and Conditions 1,2,3,4, 5,6 1,2,4,5, 6,7 1,2,3, 4,5 2,3,4,5, 6 1,3,5, 6,8 1,4,5, 6,8 1,2,3, 6,7 2,5,6, 7 2,3,6, 7 2,4,5, 6,7 4,5,6, 8 3,4,6 Comply With and Use Procedures (1) ALL ALL ALL ALL 1,3,4, 5,6,8 1,3,4, 5,6,8 1,2,3, 4,6,7 1,2,5, 6,7 2,3,4, 6,7 2,3,4, 5,6,7 1,4,5, 6,8 1,3,4, 6 Operate  Control Boards (2) N/A N/A N/A N/A 3,4,5, 6,8 1,3,4, 5,6,8 1,2,3, 4,6,7 1,2,5, 6,7 2,3,4, 6,7 1,2,3, 4,5,6, 7 1,4,5, 6,8 1,3,4, 6 Communicate and  Interact ALL ALL ALL ALL 1,3,4, 5,6,8 1,3,4, 5,6,8 1,2,3, 4,6,7 1,2,5, 6,7 2,3,4, 6,7 1,2,3, 4,5,6, 7 1,4,5, 6,8 1,3,4, 6 Demonstrate Supervisory
ES-301                                       Transient and Event Checklist                                 Form ES-301-5 Facility:     SONGS 2 and 3                            Date of Exam:     10/19/09       Operating Test No.:    NRC A            E SCENARIOS P            V P            E SONGS #1             SONGS #2            SONGS #3          SONGS #4 L            N T      MINIMUM(*)
I          T CREW                  CREW                CREW              CREW          O C
POSITION              POSITION            POSITION          POSITION        T A            T A
N            Y    S      A      B      S      A      B    S      A    B    S      A    B R      T      O      R      T      O    R      T    O    R      T    O    L      R    I    U T            P E    O      C      P    O        C      P    O      C    P    O      C    P RX              4      -            3      -            1      -          1    -    1      1    1     0 NOR              -      4             -      3           -      1         -     1   2     1    1    1 RO        I/C            3,5,2,3,7           4,2,4,7        3,4,4,5,8       2,3,4  8      4    4    2 1,3      MAJ              6     6             5,6     5,6           6      6          6    6    4      2    2    1 TS              -      -            -      -            -      -          -    -    0      0    2    2 RX              4      -            3       -            1      -          1    -    1      1    1    0 NOR              -      4             -      3            -      1          -    1    1      1    1     1 RO        I/C            3,5,8 2,3,7          4,8   2,4,7        3,4,7 4,5,8      2,7   3,4   6     4    4    2 4       MAJ              6      6            5,6     5,6           6      6          6    6    3      2    2    1 TS              -      -            -      -            -      -          -    -    0      0    2    2 RX              4      -            3       -            1      -          1    -    1      1    1    0 NOR              -      4             -      3            -      1          -    1    2     1    1    1 RO I/C            3,5,8 2,3,7          4,8   2,4,7        3,4,7 4,5,8      2,7   3,4   9      4    4    2 6
MAJ              6      6             5,6     5,6           6      6          6    6    4      2    2    1 TS              -      -            -      -            -      -          -    -    0      0    2    2 RX              4      -            3       -            1      -          1    -    1      1    1    0 NOR              -      4             -      3            -      1          -    1    1      1    1    1 RO        I/C            3,5,8 2,3,7          4,8   2,4,7        3,4,7 4,5,8      2,7   3,4   6      4    4    2 8        MAJ              6      6            5,6     5,6          6      6          6    6    3      2    2    1 TS              -      -            -      -            -      -          -    -    0      0    2    2 Instructions:
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
: 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
NUREG 1021 Revision 9.1                               Page 3 of 3        SONGS Oct 2009 NRC ES-301-5 Transient and Event Checklist Rev 1.doc


Ability (3) ALL ALL ALL ALL N/A N/A N/A N/A N/A N/A N/A N/A Comply With and Use Tech.
ES-301                                          Competencies Checklist                            Form ES-301-6 Facility:    SONGS                  Date of Examination:          10/19/09    Operating Test No. NRC 1-4 SRO                          RO (ATC)                        BOP Competencies                  SCENARIO                        SCENARIO                    SCENARIO 1      2        3      4        1    2      3      4      1      2      3      4 Interpret/Diag-1,2,3,4, 1,2,4,5, 1,2,3,  2,3,4,5, 1,3,5, 1,4,5, 1,2,3,  2,5,6, 2,3,6, 2,4,5,  4,5,6, nose Events              5,6    6,7      4,5      6      6,8  6,8    6,7    7      7    6,7      8 3,4,6 and Conditions Comply With 1,3,4, 1,3,4, 1,2,3,  1,2,5, 2,3,4, 2,3,4,  1,4,5, 1,3,4, and Use                  ALL    ALL    ALL      ALL 5,6,8 5,6,8  4,6,7  6,7    6,7  5,6,7    6,8    6 Procedures (1)
Specs. (3) 1,3 1,4 2,4 3,5 N/A N/A N/A N/A N/A N/A N/A N/A Notes: (1) Includes Technical Specification compliance for an RO. (2) Optional for an SRO-U. (3) Only applicable to SROs.
Operate                                                                                      1,2,3, 3,4,5, 1,3,4, 1,2,3,  1,2,5, 2,3,4,        1,4,5, 1,3,4, Control Boards          N/A      N/A    N/A    N/A 6,8  5,6,8  4,6,7  6,7    6,7 4,5,6, 6,8    6 7
(2)
Communicate                                                                                  1,2,3, 1,3,4, 1,3,4, 1,2,3,  1,2,5, 2,3,4,        1,4,5, 1,3,4, and                      ALL    ALL    ALL      ALL 5,6,8 5,6,8  4,6,7  6,7    6,7 4,5,6, 6,8    6 7
Interact Demonstrate Supervisory              ALL     ALL     ALL     ALL       N/A   N/A     N/A   N/A   N/A   N/A     N/A   N/A Ability (3)
Comply With and Use Tech.             1,3     1,4     2,4     3,5     N/A   N/A     N/A   N/A   N/A   N/A     N/A   N/A Specs. (3)
Notes:
(1) Includes Technical Specification compliance for an RO.
(2) Optional for an SRO-U.
(3) Only applicable to SROs.
Instructions:
Instructions:
Circle the applicants' license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.}}
Circle the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.
NUREG-1021, Revision 9.1                                                      SONGS Oct 2009 ES-301-6 Rev 0}}

Latest revision as of 06:41, 12 March 2020

SO-2009-10-DRAFT Operating Test
ML093200652
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/16/2009
From: Apger G
Operations Branch IV
To:
References
SO-2009-10
Download: ML093200652 (252)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: SONGS 2 & 3 Date of Examination: 10/19/09 Examination Level RO Operating Test Number: NRC Administrative Topic Type Code* Describe Activity to be Performed (see Note) 2.1.23 Ability to perform specific system and integrated plant procedures during all modes Conduct of Operations N, R of plant operation (4.3).

JPM: Perform an RCS Inventory Balance (New).

2.1.25 Ability to interpret reference materials such as graphs, curves, tables, etc. (3.9).

Conduct of Operations M, R JPM: Determine Time to Boil (J213A).

2.2.12 Knowledge of Surveillance Procedures (3.7).

Equipment Control N, R JPM: Perform Core Exit Thermocouple Channel Checks. (New) 2.3.12 Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high-Radiation Control M, S radiation areas, aligning filters, etc. (3.2).

JPM: Determine Dose for Maintenance Activities (J236A2).

Emergency Plan -

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; for 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

NUREG-1021, Revision 9.1 1 of 2 SONGS Oct 2009 RO ES-301-1 Rev 1

Administrative Topics Outline Task Summary RO A.1.a The candidate will perform a Reactor Coolant System Inventory Balance per SO23-3-3.37, Reactor Coolant System Inventory Balance. The critical steps include correctly documenting parameters and performing calculations within allowable tolerances. This is a new JPM.

RO A.1.b The candidate will calculate Time-to-Boil per SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin.

The critical steps include correctly interpreting curves within tolerances and performing the final calculation within given tolerances. This is a modified bank JPM.

RO A.2 The candidate will be provided with a set of Core Exit Thermocouple data and will determine if the required OPERABILITY is met using SO23-3-3.35, PAMI / Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel Checks. The critical steps include identifying any out-of-service thermocouples and correctly determining OPERABILITY of the Core Exit Thermocouple System. This is a new JPM.

RO A.3 The candidate will be required to calculate stay time based on a maintenance activity. The critical steps require determining the optimum total dose using either time, distance or shielding for performing the task.

This is a modified bank JPM.

RO A.4 N/A NUREG-1021, Revision 9.1 2 of 2 SONGS Oct 2009 RO ES-301-1 Rev 1

Appendix C JPM WORKSHEET Form ES-C-1 Facility: SONGS JPM # NRC RO A.1.a Task #185300 K/A #2.1.23 4.3/4.4

Title:

Perform Reactor Coolant System Inventory Balance Calculations Examinee (Print):

Testing Method:

Simulated Performance: Classroom: X Actual Performance: X Simulator:

Plant:

READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.

When you complete the task successfully, the objective for this JPM will be satisfied.

Initial Conditions: Given the following conditions:

  • Unit 2 is operating at 100% power.
  • The Plant Computer System Water Inventory Balance Program is not available.

Initiating Cue: The Control Room Supervisor directs you to COMPLETE the Reactor Coolant System Inventory Balance per SO23-3-3.37, Reactor Coolant System Inventory Balance, Attachment 3, Manual Leak Rate Calculation.

The following final data was obtained at 1835:

  • TAVG is 567.2°F.
  • VCT level is 44.3%.
  • Pressurizer level is 53.4%.
  • Quench Tank Level is 74.4%.
  • Safety Injection Tank SIT-007 is 80.1% narrow range.
  • Safety Injection Tank SIT-008 is 81.3% narrow range.
  • Safety Injection Tank SIT-007 is 80.9% narrow range.
  • Safety Injection Tank SIT-010 is 82.0% narrow range.
  • There is no known RCS in-leakage.

Task Standard: Locate and correctly perform Critical Steps of SO23-3-3.37, Attachment 3.

Page 1 of 9 SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Required Materials: SO23-3-3.37, Reactor Coolant System Inventory Balance, Attachment 3, Manual Leak Rate Calculation, Rev. 29.

Validation Time: 20 minutes Time Critical: N/A Completion Time: ________ minutes Comments:

Result: SAT UNSAT Examiner (Print / Sign): Date:

Page 2 of 9 SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 CLASSROOM SETUP EXAMINER:

PROVIDE the Examinee with a copy of:

  • INITIAL through Step 2.6.
  • COMPLETE Initial Data Column on Table 1.
  • MARK Step 3.2 with Stop Here.
  • INFORM examinee that any independent review requirements (Procedure Steps 2.8 and 2.9.3) need NOT be completed.

Page 3 of 9 SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc

Appendix C JPM STEPS Form ES-C-1

- Check Mark Denotes Critical Step START TIME:

Perform Step: 1 Record all final data and perform calculations on Table 1:

  • Perform and Record time calculations.

Standard: RECORD all final data and PERFORM calculations:

  • RECORD 1835 as Final Time then SUBTRACT 1633 -1835 =

+122 minutes.

  • RECORD +125 minutes.

Comment: SAT UNSAT Examiner Note: The Table 1 data recording and calculations can be performed in any order.

Perform Step: 2 Record all final data and perform calculations on Table 1:

  • Perform and record VCT calculations.

Standard: RECORD all final data and PERFORM calculations:

  • RECORD 44.3% as Final VCT Level then SUBTRACT 44.3% -

46.0% and MULTIPLY 1.7% x 38.5 gal/% = +65.45 gallons.

  • RECORD +65.45 gallons.

Comment: SAT UNSAT Perform Step: 3 Record all final data and perform calculations on Table 1:

  • Perform and record PZR calculations.

Standard: RECORD all final data and PERFORM calculations:

  • RECORD 53.4% as Final PZR Level then SUBTRACT 53.4% -

53.5% and MULTIPLY 0.1% x 52.9 gal/% = +5.29 gallons.

  • RECORD +5.29 gallons.

Comment: SAT UNSAT Perform Step: 4 Record all final data and perform calculations on Table 1:

  • Perform and record TAVG calculations.

Standard: RECORD all final data and PERFORM calculations:

  • RECORD 567.2°F as Final TAVG then SUBTRACT 567.2°F -

567.4°F and MULTIPLY 0.2°F x -87.07 gal/degree = -17.4 gallons.

  • RECORD -17.4 gallons.

Comment: SAT UNSAT Page 4 of 9 SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 5 Record all final data and perform calculations on Table 1:

  • Perform and record SIT-008 calculations.

Standard: RECORD all final data and PERFORM calculations:

  • RECORD 81.3% as Final SIT-008 level then SUBTRACT 81.3% -

81.3% = 0 % and MULTIPLY 0% x 52.9 gal/% = 0 gallons.

  • RECORD 0.0 gallons.

Comment: SAT UNSAT Perform Step: 6 Record all final data and perform calculations on Table 1:

  • Perform and record SIT-007 calculations.

Standard: RECORD all final data and PERFORM calculations:

  • RECORD 80.1% as Final SIT-007 level then SUBTRACT 80.1% -

80.1% = 0 % and MULTIPLY 0% x 52.9 gal/% = 0 gallons.

  • RECORD 0.0 gallons.

Comment: SAT UNSAT Perform Step: 7 Record all final data and perform calculations on Table 1:

  • Perform and record SIT-009 calculations.

Standard: RECORD all final data and PERFORM calculations:

  • RECORD 80.9% as Final SIT-009 level then SUBTRACT 80.9% -

80.9% = 0 % and MULTIPLY 0% x 52.9 gal/% = 0 gallons.

  • RECORD 0.0 gallons.

Comment: SAT UNSAT Perform Step: 8 Record all final data and perform calculations on Table 1:

  • Perform and record SIT-010 calculations.

Standard: RECORD all final data and PERFORM calculations:

  • RECORD 82.0% as Final SIT-010 level then SUBTRACT 82.0% -

82.0% = 0 % and MULTIPLY 0% x 52.9 gal/% = 0 gallons.

  • RECORD 0.0 gallons.

Comment: SAT UNSAT Page 5 of 9 SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 9 Record all final data and perform calculations on Table 1:

  • Perform and record Quench Tank calculations.

Standard: RECORD all final data and PERFORM calculations:

  • RECORD 74.4% as Final Quench Tank level.

Examiner Cue: Table 1 has been Independently Verified.

Comment: SAT UNSAT Perform Step: 10 Total Leak Rate Calculation:

  • Add volume changes from Table 1:

(Algebraic sum) (Circle sign) gal VCT (+) (-) ____ gal Standard: RECORD all final data and PERFORM calculations:

  • RECORD VCT change as 65.45 gallons and CIRCLE (+).

Comment: SAT UNSAT Perform Step: 11 Total Leak Rate Calculation:

  • Add volume changes from Table 1:

(Algebraic sum) (Circle sign) gal PZR (+) (-) ____ gal Standard: RECORD all final data and PERFORM calculations:

  • RECORD PZR change as 5.29 gallons and CIRCLE (+).

Comment: SAT UNSAT Perform Step: 12 Total Leak Rate Calculation:

  • Add volume changes from Table 1:

(Algebraic sum) (Circle sign) gal TAVG (+) (-) ____ gal Standard: RECORD all final data and PERFORM calculations:

  • RECORD TAVG change as 17.4 gallons and CIRCLE (-).

Comment: SAT UNSAT Page 6 of 9 SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 13 Total Leak Rate Calculation:

  • Add volume changes from Table 1:

(Algebraic sum) (Circle sign) gal VCT (+) (-) ____ gal gal PZR (+) (-) ____ gal gal TAVG (+) (-) ____ gal Subtotal ____ gal Standard: RECORD all final data and PERFORM calculations:

  • ADD (+65.45) + (+5.29) + (-17.4) = +53.34 gallons.
  • RECORD Total change as 53.34 gallons.

Comment: SAT UNSAT Perform Step: 14 Total Leak Rate Calculation:

  • Calculate (divide):

Subtotal ____ gal Test Duration ÷ ____ min Calculated Total Leak Rate ____ gpm Identified In-leakage + ____ gpm TOTAL LEAK RATE = ____ gpm Standard: RECORD all final data and PERFORM calculations:

  • DIVIDE 53.34 gallons by 125 minutes = 0.43 +/- 0.03 gpm (to nearest 1/100th).
  • RECORD 0.43 +/- 0.03 gpm for Calculated Total Leak Rate.
  • RECORD zero (0) for Identified In-leakage.
  • RECORD 0.43 +/- 0.03 gpm for Total Leak Rate.

Examiner Cue: Total Leak Rate Calculation has been Independently Verified.

Comment: SAT UNSAT Perform Step: 15 If Total Leak Rate, Step 2.9.2, is 1 gpm, then Mark N/A Sections 2.10 and 2.11, and Circle N/A for Identified Leak Rate and Unidentified Leak Rate in Step 3.1. (Mark N/A if Total Leak Rate > 1 gpm.)

Standard: RECORD final data:

  • DETERMINE leakrate to be less than 1 gpm.
  • MARK N/A Sections 2.10 and 2.11.

Comment: SAT UNSAT Page 7 of 9 SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 16 Acceptance Criteria Result.

Standard: RECORD total leakrate value, DETERMINE total leakrate 1gpm and CIRCLE YES for ACCEPTANCE CRITERIA.

Terminating Cue: This JPM is complete.

Comment: SAT UNSAT STOP TIME:

Page 8 of 9 SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:

  • Unit 2 is operating at 100% power.
  • The Plant Computer System Water Inventory Balance Program is not available.

INITIATING CUE: The Control Room Supervisor directs you to COMPLETE the Reactor Coolant System Inventory Balance per SO23-3-3.37, Reactor Coolant System Inventory Balance, Attachment 3, Manual Leak Rate Calculation. The following final data was obtained at 1835:

  • TAVG is 567.2°F.
  • VCT level is 44.3%.
  • Pressurizer level is 53.4%.
  • Quench Tank Level is 74.4%.
  • Safety Injection Tank SIT-007 is 80.1% narrow range.
  • Safety Injection Tank SIT-008 is 81.3% narrow range.
  • Safety Injection Tank SIT-009 is 80.9% narrow range.
  • Safety Injection Tank SIT-010 is 82.0% narrow range.
  • There is no known RCS in-leakage.

Page 9 of 9 SONGS Oct 2009 NRC RO Admin JPM A.1.a Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Facility: SONGS JPM # NRC RO A.1.b Task #188898 K/A #2.1.25 3.9/4.2

Title:

Determine Time to Boil Examinee (Print):

Testing Method:

Simulated Performance: Classroom: X Actual Performance: X Simulator:

Plant:

READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.

When you complete the task successfully, the objective for this JPM will be satisfied.

Initial Conditions: Given the following conditions:

  • Unit 3 is in MODE 6 after a 420 day run.
  • The core reload is complete with 101 new fuel assemblies.
  • The Reactor has been shut down for 22 days.
  • The Pressurizer Manway is removed and is being used as the RCS vent.

Initiating Cue: The Shift Manager directs you to PERFORM the following:

  • SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin.
  • Outage specific Time to Boil Data Transmittal has NOT been provided by Reactor Engineering.

Task Standard: Locate and correctly perform Critical Steps of SO23-5-1.8.1, Attachment 9.

Required Materials: SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin, Rev. 20.

Validation Time: 15 minutes Time Critical: N/A Completion Time: ________ minutes Comments:

Page 1 of 6 SONGS Oct 2009 NRC RO Admin JPM A.1.b Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Result: SAT UNSAT Examiner (Print / Sign): Date:

Page 2 of 6 SONGS Oct 2009 NRC RO Admin JPM A.1.b Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 CLASSROOM SETUP EXAMINER:

PROVIDE the examinee with a copy of:

  • SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of the RCS Time-to-Boil Margin.

Page 3 of 6 SONGS Oct 2009 NRC RO Admin JPM A.1.b Rev 0.doc

Appendix C JPM STEPS Form ES-C-1

- Check Mark Denotes Critical Step START TIME:

Perform Step: 1 Determine Time-to-Boil margin temperature as follows:

BMact = BMref x Lcf x Tcf x Ncf

  • Determine BMref Standard: REFERENCE BMref Table and INTERPOLATE between 20 and 30 days as follows:

[(39.09 - 32.4) X .2] + 32.4 = 33.74 minutes Comment: SAT UNSAT Perform Step: 2 Determine Time-to-Boil margin temperature as follows:

BMact = BMref x Lcf x Tcf x Ncf

  • Determine Lcf Standard: REFERENCE Lcf Table and DETERMINE Lcf to be 1.008 at 27 inches.

Comment: SAT UNSAT Perform Step: 3 Determine Time-to-Boil margin temperature as follows:

BMact = BMref x Lcf x Tcf x Ncf

  • Determine Tcf Standard: SELECT Tcf formula of Tcf = (212 - Thot) / 92.

Comment: SAT UNSAT Perform Step: 4 Determine Time-to-Boil margin temperature as follows:

BMact = BMref x Lcf x Tcf x Ncf

  • Determine Tcf Standard: CALCULATE Tcf = (212 - 115.5) / 92 = 1.049 +/- 0.002 Comment: SAT UNSAT Page 4 of 6 SONGS Oct 2009 NRC RO Admin JPM A.1.b Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 5 Determine Time-to-Boil margin temperature as follows:

BMact = BMref x Lcf x Tcf x Ncf

  • Determine Ncf where Ncf = 217 / (217- # new assemblies)

Standard: CALCULATE Ncf = 217 / (217-101) = 1.87 Comment: SAT UNSAT Perform Step: 6 Determine Time-to-Boil margin temperature as follows:

BMact = BMref x Lcf x Tcf x Ncf Standard: BMact = (33.74 min) X (1.008) X (1.049) X (1.87) = 66.7 +/- 2.5 minutes Terminating Cue: This JPM is complete.

Comment: SAT UNSAT STOP TIME:

Page 5 of 6 SONGS Oct 2009 NRC RO Admin JPM A.1.b Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:

  • Unit 3 is in MODE 6 after a 420 day run.
  • The core reload is complete with 101 new fuel assemblies.
  • The Reactor has been shut down for 22 days.
  • The Pressurizer Manway is removed and is being used as the RCS vent.

INITIATING CUE: The Shift Manager directs you to PERFORM the following:

  • SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin.
  • Outage specific Time to Boil Data Transmittal has NOT been provided by Reactor Engineering.

Page 6 of 6 SONGS Oct 2009 NRC RO Admin JPM A.1.b Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Facility: SONGS JPM # NRC RO A.2 Task #185785 K/A #2.2.12 3.7/4.1

Title:

Perform Core Exit Thermocouple Channel Checks Examinee (Print):

Testing Method:

Simulated Performance: Classroom: X Actual Performance: X Simulator:

Plant:

READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.

When you complete the task successfully, the objective for this JPM will be satisfied.

Initial Conditions: Given the following conditions:

  • Unit 2 is in MODE 1 at 100% power.

Initiating Cue: The Shift Manager directs you to PERFORM the following:

  • SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel Checks.

Task Standard: Locate and correctly perform Critical Steps SO23-3-3.35, Attachment 2.

Required Materials: SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Rev. 22.

Validation Time: 25 minutes Time Critical: N/A Completion Time: ________ minutes Comments:

Result: SAT UNSAT Examiner (Print / Sign): Date:

Page 1 of 8 SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 CLASSROOM SETUP EXAMINER:

PROVIDE the examinee with a copy of:

  • SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel Checks.
  • INITIAL through Step 1.4.
  • MARK Stop Here at Step 3.1.

Page 2 of 8 SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1

- Check Mark Denotes Critical Step START TIME:

Perform Step: 1 Record the following: (QSPDS page 611)

  • COLD LEG 1A TEMP.
  • COLD LEG 1B TEMP.

Standard: RECORD 541°F for Cold Leg 1A and Cold Leg 1B temperatures.

Comment: SAT UNSAT Perform Step: 2 Verify Acceptance Criteria:

  • QSPDS 1A & 1B Cold Leg Temps within 5°F?

Standard: CHECK YES box for QSPDS 1A & 1B Cold Leg temperatures within 5°F.

Comment: SAT UNSAT Perform Step: 3 Record the following: (QSPDS page 611)

  • COLD LEG 2A TEMP.
  • COLD LEG 2B TEMP.

Standard: RECORD 540°F for Cold Leg 2A and Cold Leg 2B temperatures.

Comment: SAT UNSAT Perform Step: 4 Verify Acceptance Criteria:

  • QSPDS 2A & 2B Cold Leg Temps within 5°F?

Standard: CHECK YES box for QSPDS 2A & 2B Cold Leg temperatures within 5°F.

Comment: SAT UNSAT Perform Step: 5 Record the following: (QSPDS page 611)

Standard: RECORD 611°F for REP CET (QSPDS A) and 612°F for REP CET (QSPDS B) temperatures.

Comment: SAT UNSAT Page 3 of 8 SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 6 Verify Acceptance Criteria:

  • REP CET Temperatures within 9°F?

Standard: CHECK YES box for REP CET temperatures within 9°F.

Comment: SAT UNSAT Perform Step: 7 Transfer the Highest operable Cold Leg Temperature of Step 2.1.1 into the "Low Limit" of Steps 2.1.6 and 2.1.8.

Standard: RECORD 541°F in "Low Limit Temp." box for Steps 2.1.6 and 2.1.8.

Comment: SAT UNSAT Perform Step: 8 Transfer the Lowest operable REP CET temperature of Step 2.1.1 into the "High Limit" of Steps 2.1.6 and 2.1.8.

Standard: RECORD 611°F in "High Limit Temp." box for Steps 2.1.6 and 2.1.8.

Comment: SAT UNSAT Perform Step: 9 Record CET Temperatures from QSPDS "A" Page 731:

  • Write N/A for G-20.

Standard: RECORD N/A for CET G-20 and RECORD CET Temperatures from QSPDS A Core Exit Thermocouple Map (JPM Cue Sheet).

Comment: SAT UNSAT Perform Step: 10 Record the total number of CETs which are within "In-Range" limits for each column.

Standard: RECORD the following from QSPDS A Core Exit Thermocouple Map:

  • QUAD 1 = 5; QUAD 2 = 6; QUAD 3 = 8; QUAD 4 = 6.

Comment: SAT UNSAT Perform Step: 11 At least two CETs per Column are "In-Range" for Channel "A" QSPDS:

YES NO Standard: CHECK YES box.

Comment: SAT UNSAT Page 4 of 8 SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 12 Record CET Temperatures from QSPDS "B" Page 731:

Standard: RECORD CET Temperatures from QSPDS B Core Exit Thermocouple Map (JPM Cue Sheet).

Comment: SAT UNSAT Perform Step: 13 Record the total number of CETs which are within the "In-Range" limits for each column.

Standard: RECORD the following from QSPDS B Core Exit Thermocouple Map:

  • QUAD 1 = 6; QUAD 2 = 7; QUAD 3 = 1; QUAD 4 = 6.

Comment: SAT UNSAT Perform Step: 14 At least two CETs per Column are "In-Range" for channel "B" QSPDS:

YES NO Standard: CHECK NO box.

Comment: SAT UNSAT Perform Step: 15 If any CETs are not "In-Range", then ensure a Notification has been initiated, and record NEW Notification numbers in the comments section.

Standard: ANNOTATE that a Notification for QSPDS B CET failure has been initiated in the COMMENTS Section.

Comment: SAT UNSAT Perform Step: 16 Heated Junction Thermocouple System Channel Check

  • Record the differential temperatures of the Heated Junction Thermocouples (HJTCs) from QSPDS Page 721 on Table 2.

Standard: RECORD the differential temperatures of the Heated Junction Thermocouples from QSPDS Page 721 on Table 2.

Comment: SAT UNSAT Page 5 of 8 SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 17 At least One Head differential temperature and at least Three Plenum differential temperatures for Channel A fall within the range of 40°F (lower limit) to 200°F (upper limit)?

YES NO Standard: CHECK YES box.

Comment: SAT UNSAT Perform Step: 18 At least One Head differential temperature and at least Three Plenum differential temperatures for Channel B fall within the range of 40°F (lower limit) to 200°F (upper limit)?

YES NO Standard: CHECK YES box.

Terminating Cue: This JPM is complete.

Comment: SAT UNSAT STOP TIME:

Page 6 of 8 SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:

  • Unit 2 is in MODE 1 at 100% power.

INITIATING CUE: The Shift Manager directs you to PERFORM the following:

  • SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel Checks.

Page 7 of 8 SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 CHANNEL A CORE EXIT THERMOCOUPLE MAP DATA (PAGE 731)

QUADRANT 1 QUADRANT 2 QUADRANT 3 QUADRANT 4 1 W6 583°F 1 T18 591°F 1 G9 582°F 1 T2 593°F 2 W13 590°F 2 L13 573°F 2 G13 576°F 2 R4 587°F 3 W18 558°F 3 L16 584°F 3 E6 589°F 3 R6 612°F 4 T13 582°F 4 G16 588°F 4 E9 588°F 4 L2 575°F 5 T16 589°F 5 G18 589°F 5 C4 560°F 5 L9 573°F 6 G20 84°F 6 C9 591°F 6 G2 606°F 7 E20 553°F 7 C16 590°F 7 E4 589°F 8 A8 572°F 9 A14 540°F CHANNEL B CORE EXIT THERMOCOUPLE MAP (PAGE 731)

QUADRANT 1 QUADRANT 2 QUADRANT 3 QUADRANT 4 1 Y8 541°F 1 T20 548°F 1 E13 583°F 1 T4 593°F 2 Y14 563°F 2 R16 585°F 2 E16 611°F 2 R2 585°F 3 W4 - 3 R18 584°F 3 C6 - 3 L4 600°F 4 W9 610°F 4 R20 601°F 4 C13 612°F 4 L6 592°F 5 W16 598°F 5 L18 594°F 5 C18 - 5 G4 589°F 6 T6 585°F 6 L20 576°F 6 G6 608°F 7 T9 614°F 7 E18 588°F 7 E2 540°F 8 R9 585°F 9 R13 588°F Page 8 of 8 SONGS Oct 2009 NRC RO Admin JPM A.2 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Facility: SONGS JPM # NRC RO A.3 Task #113888 K/A #2.3.12 3.2/3.7

Title:

Determine Dose for Maintenance Activities Examinee (Print):

Testing Method:

Simulated Performance: Classroom: X Actual Performance: X Simulator:

Plant:

READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.

When you complete the task successfully, the objective for this JPM will be satisfied.

Initial Conditions: A high dose maintenance activity is scheduled in the Unit 3 Penetration Building.

  • The general dose rate in the area is 80 mrem/hour but can be reduced to 35 mrem/hour if lead shielding is installed.
  • It will take Operators A & B 45 minutes to install the shielding if desired.
  • Independent of the shielding, it will take Operator A two and a half (2.5) hours or Operators A & B an hour and one half (1.5) hours to perform the maintenance.

Initiating Cue: The Work Process Supervisor directs you to SELECT the condition with the lowest total dose to perform the maintenance.

  • ANNOTATE the total dose for each option.
1. Operator A without shielding total dose _________.
2. Operators A & B without shielding total dose ________.
3. Operator A with shielding total dose ________.
4. Operators A & B with shielding total dose ________.
  • CIRCLE the lowest dose condition.

Task Standard: Choose the methodology that result in keeping total dose As Low As Reasonably Achievable (ALARA).

Required Materials: Calculator Validation Time: 8 minutes Time Critical: N/A Completion Time: ________ minutes Page 1 of 6 SONGS Oct 2009 NRC RO Admin JPM A.3 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Comments:

Result: SAT UNSAT Examiner (Print / Sign): Date:

Page 2 of 6 SONGS Oct 2009 NRC RO Admin JPM A.3 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 CLASSROOM SETUP EXAMINER:

PROVIDE the examinee with a Calculator.

Page 3 of 6 SONGS Oct 2009 NRC RO Admin JPM A.3 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1

- Check Mark Denotes Critical Step START TIME:

Perform Step: 1 Determine total dose to Operator A without shielding.

Standard: DETERMINE total dose to Operator A without shielding as follows:

  • 80 mrem/hr x 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> = 200 mrem total dose.

Comment: SAT UNSAT Perform Step: 2 Determine total dose to Operators A & B without shielding.

Standard: DETERMINE total dose to Operators A & B without shielding as follows:

80 mrem/hr x 1.5 hour5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />s/operator x 2 operators = 240 mrem total dose.

Comment: SAT UNSAT Perform Step: 3 Determine total dose to install shielding.

Standard: DETERMINE total dose to install shielding as follows:

  • 80 mrem/hr x .75 hour8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br />s/operator x 2 operators = 120 mrem to install.

Comment: SAT UNSAT Perform Step: 4 Determine total dose to Operator A with shielding.

Standard: DETERMINE total dose to Operator A with shielding as follows:

  • 35 mrem/hr x 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> + 120 mrem = 207.5 mrem total dose.

Comment: SAT UNSAT Perform Step: 5 Determine total dose to Operators A & B with shielding.

Standard: DETERMINE total dose to Operators A & B with shielding as follows:

  • 35 mrem/hr x 1.5 hour5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />s/operator x 2 operators + 120 mrem =

225 mrem total dose.

Comment: SAT UNSAT Page 4 of 6 SONGS Oct 2009 NRC RO Admin JPM A.3 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 6 Select the appropriate individual.

Standard: DETERMINE total dose to Operator A without shielding at a total dose of 200 mrem is the most desirable selection and CIRCLE #1 on the Cue sheet.

Terminating Cue: This JPM is complete.

Comment: SAT UNSAT STOP TIME:

Page 5 of 6 SONGS Oct 2009 NRC RO Admin JPM A.3 Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: A high dose maintenance activity is scheduled in the Unit 3 Penetration Building.

  • The general dose rate in the area is 80 mrem/hour but can be reduced to 35 mrem/hour if lead shielding is installed.
  • It will take Operators A & B 45 minutes to install the shielding if desired.
  • Independent of the shielding, it will take Operator A two and a half (2.5) hours or Operators A & B an hour and one half (1.5) hours to perform the maintenance.

INITIATING CUE: The Work Process Supervisor directs you to SELECT the condition with the lowest total dose to perform the maintenance.

  • ANNOTATE the total dose for each option.
1. Operator A without shielding total dose _____ mrem.
2. Operators A & B without shielding total dose _____ mrem.
3. Operator A with shielding total dose _____ mrem.
4. Operators A & B with shielding total dose _____ mrem.
  • CIRCLE the lowest dose condition.

Page 6 of 6 SONGS Oct 2009 NRC RO Admin JPM A.3 Rev 0.doc

ES-301 Administrative Topics Outline Form ES-301-1 Facility: SONGS 2 & 3 Date of Examination: 10/19/09 Examination Level SRO Operating Test Number: NRC Administrative Topic Type Code* Describe Activity to be Performed (see Note) 2.1.23 Ability to perform specific system and integrated plant procedures during all modes Conduct of Operations M, R of plant operation (4.4).

JPM: Determine Azimuthal Power Tilt (J250A).

2.1.25 Ability to interpret reference materials such as graphs, curves, tables, etc. (4.2).

Conduct of Operations M, R JPM: Determine Time to Boil (J213A).

2.2.12 Knowledge of Surveillance Procedures (4.1).

Equipment Control N, R JPM: Review Core Exit Thermocouple Channel Check surveillance and verify Technical Specification Compliance. (New) 2.3.12 Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling Radiation Control responsibilities, access to locked high-N, R radiation areas, aligning filters, etc. (3.7).

JPM: Determine Containment Access Requirements (New).

2.4.44 Knowledge of emergency plan protective action recommendations. (4.4).

Emergency Plan M, R JPM: Determine Protective Actions (J126A).

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; for 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

NUREG-1021, Revision 9.1 1 of 2 SONGS Oct 2009 SRO ES-301-1 Rev 1

Administrative Topics Outline Task Summary SRO A.1.a The candidate will perform an Azimuthal Power Tilt calculation per SO23-3-3.6, COLSS Out of Service Surveillance, attachment 3, Azimuthal Power Tilt Determination. The critical steps include correctly transposing data, accurately performing all calculations, correctly identifying out of tolerance conditions and identifying required actions. Additionally, a determination of actions for out-of-tolerance Azimuthal Tilt is required.

This is a modified bank JPM.

SRO A.1.b The candidate will calculate Time-to-Boil per SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin.

The critical steps include correctly interpreting curves within tolerances and performing the final calculation within given tolerances. This is a modified bank JPM.

SRO A.2 The candidate will be provided with a set of Core Exit Thermocouple data and will determine if the required OPERABILITY is met using SO23-3-3.35, PAMI / Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel Checks. The critical steps include identifying any out-of-service thermocouples, correctly determining OPERABILITY, and recording entry into any required Technical Specification LCOs for the Core Exit Thermocouple System. This is a new JPM.

SRO A.3 The candidate will determine the requirements for Containment access per SO23-3-2.34, Containment Access Control, Inspections and Airlocks Operation. The critical steps include properly identifying all requirements on Attachment 1, Containment Access Requirements. This is a new JPM.

SRO A.4 The candidate will review given plant conditions and offsite dose information and determine required protective actions per SO123-VIII-10.3, Protective Action Recommendations. The critical steps include determining the affected areas and the recommended protective actions. This is a modified bank JPM.

NUREG-1021, Revision 9.1 2 of 2 SONGS Oct 2009 SRO ES-301-1 Rev 1

Appendix C JPM WORKSHEET Form ES-C-1 Facility: SONGS JPM # NRC SRO A.1.a Task #187652 K/A #2.1.23 4.3/4.4

Title:

Determine Azimuthal Power Tilt Examinee (Print):

Testing Method:

Simulated Performance: Classroom: X Actual Performance: X Simulator:

Plant:

READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.

When you complete the task successfully, the objective for this JPM will be satisfied.

Initial Conditions: Given the following conditions:

  • Unit 2 is in Mode 1 at 99.98% power.
  • Part-Length Control Element Assemblies (PLCEAs) are at 145 inches.
  • Core Protection Calculator Channel B and Core Operating Limits Supervisory System (COLSS) are INOPERABLE.
  • COLSS out of service surveillances are in progress.

Initiating Cue: The Shift Manager directs you to PERFORM the following:

  • CALCULATE Azimuthal Power Tilt per SO23-3-3.6, COLSS Out of Service Surveillance, Attachment 3, Azimuthal Power Tilt Determination starting at Step 3.2.
  • VERIFY Instrument data has been recorded at Steps 3.1 and 3.4.
  • DOCUMENT any Technical Specification REQUIRED ACTION(s) in the COMMENTS Section of Attachment 3.
  • Another SRO will PERFORM Independent Verification when the surveillance is complete.

Task Standard: Locate and correctly perform Critical Steps of SO23-3-3.6, Attachment 3 and Technical Specification LCO 3.2.3.

Required Materials: SO23-3-3.6, COLSS Out of Service Surveillance, Attachment 3, Azimuthal Power Tilt Determination, Rev. 12-2.

Technical Specification LCO 3.2.3, Azimuthal Power Tilt (Tq), Amendment #127.

Validation Time: 22 minutes Time Critical: N/A Completion Time: ________ minutes Page 1 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Comments:

Result: SAT UNSAT Examiner (Print / Sign): Date:

Page 2 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 CLASSROOM SETUP EXAMINER:

PROVIDE the examinee with a copy of:

  • SO23-3-3.6, COLSS Out of Service Surveillance, Attachment 3, Azimuthal Power Tilt Determination as follows:
  • ENTER data prior to Section 1.0, Prerequisites:
  • Unit 2; MODE 1; RX POWER is 99.98%; DATE is Today; Time is Now
  • INITIAL Steps 1.1 and 1.2.
  • ENTER the following data at Step 3.1 and INITIAL:
  • 1.0299 for Channel A, C and D.
  • INOP for Channel B.
  • ENTER the following data at Step 3.4.1 and INITIAL:
  • 90.51 for Channel A, 92.115 for Channel C and 91.565 for Channel D.
  • INOP for Channel B.
  • ENTER the following data at Step 3.4.2 and INITIAL:
  • 110.89 for Channel A, 112.59 for Channel C and 111.89 for Channel D.
  • INOP for Channel B.
  • ENTER the following data at Step 3.4.3 and INITIAL:
  • 90.10 for Channel A, 91.95 for Channel C and 91.355 for Channel D.
  • INOP for Channel B.

Page 3 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc

Appendix C JPM STEPS Form ES-C-1

- Check Mark Denotes Critical Step START TIME:

Perform Step: 1 Record the CPC AZ Tilt Allowance from each Operable CPC channel (CPC PID 063). (Mark INOP or TRIPPED as applicable for any channel not available.)

Standard: VERIFY data is recorded at Step 3.1.

Comment: SAT UNSAT Perform Step: 2 Subtract 1 from each Azimuthal Tilt Allowance in Step 3.1 and record results. (Mark INOP or TRIPPED as applicable for any channel not available.)

Standard: RECORD 0.0299 for Channels A, C, and D. MARK Channel B as INOP.

Comment: SAT UNSAT Perform Step: 3 Determine the applicable equation to be used based on the number of Operable CPC channels. Circle the equation to be used.

Standard: CIRCLE equation at Step 3.3.3:

Comment: SAT UNSAT Perform Step: 4 Record Excore Neutron Flux Detector values from each Operable CPC channel. (Mark INOP or TRIPPED as applicable for any channel not available.)

  • Upper detector (PID 010:)
  • Middle detector (PID 011:)
  • Lower detector (PID 012:)

Standard: VERIFY data is recorded at Step 3.4.1.

Comment: SAT UNSAT Page 4 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 5 Determine the CPC Azimuthal Power Tilt for each level of detectors using the following equation: (Record the selected equation from Step 3.3)

Standard: RECORD Step 3.3.3 Channel A, C and D detectors where appropriate.

Comment: SAT UNSAT Perform Step: 6 Determine the CPC Azimuthal Power Tilt for each level of detectors using the following equation:

  • Upper Detector Standard: INSERT Upper Detector values into equation and SOLVE with a result of 0.0148.

Comment: SAT UNSAT Perform Step: 7 Determine the CPC Azimuthal Power Tilt for each level of detectors using the following equation:

  • Middle Detector Standard: INSERT Middle Detector values into equation and SOLVE with a result of 0.0124.

Comment: SAT UNSAT Perform Step: 8 Determine the CPC Azimuthal Power Tilt for each level of detectors using the following equation:

  • Lower Detector Standard: INSERT Lower Detector values into equation and SOLVE with a result of 0.0173.

Comment: SAT UNSAT Perform Step: 9 Record the average (TCPC) of the tilts calculated in Step 3.5. If one of the values of Steps 3.5.1 through 3.5.3 is significantly different than the other two it may be omitted from the average with permission from the Shift Manager and a Reactor Engineer. (Note in the Comments Section any tilt value not used, and use 0 in the applicable space below.)

Standard: CALCULATE and RECORD average TCPC :

  • ADD 0.0148 + 0.0124 + 0.0173 = 0.0148.

Comment: SAT UNSAT Page 5 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 10 Determine Azimuthal Power Tilt (Tq):

  • Tq = 2.5 X _____Tcpc (from Step 3.6)

Standard: Determine Azimuthal Power Tilt (Tq):

  • MULTIPLY 0.0148 x 2.5 = 0.037 +/- 0.001 = Tq Comment: SAT UNSAT Perform Step: 11 If Azimuthal Power Tilt (Tq) from Step 3.8 is greater than 0.03, then INITIATE an AR, record the AR number in the Comments Section, then contact Reactor Engineering to evaluate core design and to establish operating restrictions and surveillance requirements within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

Standard: DETERMINE that Azimuthal Power Tilt (Tq) from Step 3.8 is greater than 0.03 and RECORD these actions in the Comments Section:

  • INITIATE an AR and RECORD in the Comments Section.
  • CONTACT Reactor Engineering.

Comment: SAT UNSAT Perform Step: 12 The calculated Azimuthal Power Tilt (Tq) (Step 3.8) is less than or equal to the Azimuthal Tilt Allowance used in the Core Protection Calculators (Step 3.2). Yes / No (circle one)

Standard: CIRCLE No.

Comment: SAT UNSAT Perform Step: 13 If NO is circled, then refer to Tech. Spec. LCO 3.2.3, INITIATE required actions and LCOAR/EDMR as applicable, and record actions taken in the Comments Section.

Standard: RECORD these actions in the COMMENTS Section from TS LCO 3.2.3:

  • LCO 3.2.3.B.1 - ADJUST the Tq allowance in the CPCs to greater than or equal to the measured Tq within two hours
  • LCO 3.2.3.B.2 - EVALUATE core design and safety analysis and determine that the core is acceptable for continued operation within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
  • LCO 3.2.3.B.3 - ESTABLISH appropriate operating restrictions and SRs within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

Terminating Cue: This JPM is complete.

Comment: SAT UNSAT STOP TIME:

Page 6 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:

  • Unit 2 is in Mode 1 at 99.98% power.
  • Part-Length Control Element Assemblies (PLCEAs) are at 145 inches.
  • Core Protection Calculator Channel B and Core Operating Limits Supervisory System (COLSS) are INOPERABLE.
  • COLSS out-of service-surveillances are in progress.

INITIATING CUE: The Shift Manager directs you to PERFORM the following:

  • CALCULATE Azimuthal Power Tilt per SO23-3-3.6, COLSS Out of Service Surveillance, Attachment 3, Azimuthal Power Tilt Determination starting at Step 3.2.
  • VERIFY Instrument data has been recorded at Steps 3.1 and 3.4.
  • DOCUMENT any Technical Specification REQUIRED ACTION(s) in the COMMENTS Section of Attachment 3.
  • Another SRO will PERFORM Independent Verification when the surveillance is complete.

Page 7 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.1.a Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Facility: SONGS JPM # NRC SRO A.1.b Task #188898 K/A #2.1.25 3.9/4.2

Title:

Determine Time to Boil Examinee (Print):

Testing Method:

Simulated Performance: Classroom: X Actual Performance: X Simulator:

Plant:

READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.

When you complete the task successfully, the objective for this JPM will be satisfied.

Initial Conditions: Given the following conditions:

  • Unit 3 is in MODE 6 after a 420 day run.
  • The core reload is complete with 101 new fuel assemblies.
  • The Reactor has been shut down for 22 days.
  • The Pressurizer Manway is removed and is being used as the RCS vent.

Initiating Cue: The Shift Manager directs you to PERFORM the following:

  • SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin.
  • Outage specific Time to Boil Data Transmittal has NOT been provided by Reactor Engineering.

Task Standard: Locate and correctly perform Critical Steps of SO23-5-1.8.1, Attachment 9.

Required Materials: SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin, Rev. 20.

Validation Time: 15 minutes Time Critical: N/A Completion Time: ________ minutes Comments:

Page 1 of 6 SONGS Oct 2009 NRC SRO Admin JPM A.1.b Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Result: SAT UNSAT Examiner (Print / Sign): Date:

Page 2 of 6 SONGS Oct 2009 NRC SRO Admin JPM A.1.b Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 CLASSROOM SETUP EXAMINER:

PROVIDE the examinee with a copy of:

  • SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of the RCS Time-to-Boil Margin.

Page 3 of 6 SONGS Oct 2009 NRC SRO Admin JPM A.1.b Rev 0.doc

Appendix C JPM STEPS Form ES-C-1

- Check Mark Denotes Critical Step START TIME:

Perform Step: 1 Determine Time-to-Boil margin temperature as follows:

BMact = BMref x Lcf x Tcf x Ncf

  • Determine BMref Standard: REFERENCE BMref Table and INTERPOLATE between 20 and 30 days as follows:

[(39.09 - 32.4) X .2] + 32.4 = 33.74 minutes Comment: SAT UNSAT Perform Step: 2 Determine Time-to-Boil margin temperature as follows:

BMact = BMref x Lcf x Tcf x Ncf

  • Determine Lcf Standard: REFERENCE Lcf Table and DETERMINE Lcf to be 1.008 at 27 inches.

Comment: SAT UNSAT Perform Step: 3 Determine Time-to-Boil margin temperature as follows:

BMact = BMref x Lcf x Tcf x Ncf

  • Determine Tcf Standard: SELECT Tcf formula of Tcf = (212 - Thot) / 92.

Comment: SAT UNSAT Perform Step: 4 Determine Time-to-Boil margin temperature as follows:

BMact = BMref x Lcf x Tcf x Ncf

  • Determine Tcf Standard: CALCULATE Tcf = (212 - 115.5) / 92 = 1.049 +/- 0.002 Comment: SAT UNSAT Page 4 of 6 SONGS Oct 2009 NRC SRO Admin JPM A.1.b Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 5 Determine Time-to-Boil margin temperature as follows:

BMact = BMref x Lcf x Tcf x Ncf

  • Determine Ncf where Ncf = 217 / (217- # new assemblies)

Standard: CALCULATE Ncf = 217 / (217-101) = 1.87 Comment: SAT UNSAT Perform Step: 6 Determine Time-to-Boil margin temperature as follows:

BMact = BMref x Lcf x Tcf x Ncf Standard: BMact = (33.74 min) X (1.008) X (1.049) X (1.87) = 66.7 +/- 2.5 minutes Terminating Cue: This JPM is complete.

Comment: SAT UNSAT STOP TIME:

Page 5 of 6 SONGS Oct 2009 NRC SRO Admin JPM A.1.b Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:

  • Unit 3 is in MODE 6 after a 420 day run.
  • The core reload is complete with 101 new fuel assemblies.
  • The Reactor has been shut down for 22 days.
  • The Pressurizer Manway is removed and is being used as the RCS vent.

INITIATING CUE: The Shift Manager directs you to PERFORM the following:

  • SO23-5-1.8.1, Shutdown Nuclear Safety, Attachment 9, Calculation of RCS Time-to-Boil Margin.
  • Outage specific Time to Boil Data Transmittal has NOT been provided by Reactor Engineering.

Page 6 of 6 SONGS Oct 2009 NRC SRO Admin JPM A.1.b Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Facility: SONGS JPM # NRC RO A.2 Task #185785 K/A #2.2.12 3.7/4.1

Title:

Perform Core Exit Thermocouple Channel Checks Examinee (Print):

Testing Method:

Simulated Performance: Classroom: X Actual Performance: X Simulator:

Plant:

READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.

When you complete the task successfully, the objective for this JPM will be satisfied.

Initial Conditions: Given the following conditions:

  • Unit 2 is in MODE 1 at 100% power.

Initiating Cue: The Shift Manager directs you to PERFORM the following:

  • SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel Checks.
  • RECORD any Technical Specification LCO REQUIRED ACTIONS in the Comments Section of SO23-3-3.35.

Task Standard: Locate and correctly perform Critical Steps SO23-3-3.35, Attachment 2.

Required Materials: SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Rev. 22.

Unit 2 Technical Specifications.

Validation Time: 25 minutes Time Critical: N/A Completion Time: ________ minutes Comments:

Result: SAT UNSAT Examiner (Print / Sign): Date:

Page 1 of 9 SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 CLASSROOM SETUP EXAMINER:

PROVIDE the examinee with a copy of:

  • SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel Checks.
  • INITIAL through Step 1.4.
  • MARK Stop Here at Step 3.3.
  • Unit 2 Technical Specifications.

Page 2 of 9 SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1

- Check Mark Denotes Critical Step START TIME:

Perform Step: 1 Record the following: (QSPDS page 611)

  • COLD LEG 1A TEMP.
  • COLD LEG 1B TEMP.

Standard: RECORD 541°F for Cold Leg 1A and Cold Leg 1B temperatures.

Comment: SAT UNSAT Perform Step: 2 Verify Acceptance Criteria:

  • QSPDS 1A & 1B Cold Leg Temps within 5°F?

Standard: CHECK YES box for QSPDS 1A & 1B Cold Leg temperatures within 5°F.

Comment: SAT UNSAT Perform Step: 3 Record the following: (QSPDS page 611)

  • COLD LEG 2A TEMP.
  • COLD LEG 2B TEMP.

Standard: RECORD 540°F for Cold Leg 2A and Cold Leg 2B temperatures.

Comment: SAT UNSAT Perform Step: 4 Verify Acceptance Criteria:

  • QSPDS 2A & 2B Cold Leg Temps within 5°F?

Standard: CHECK YES box for QSPDS 2A & 2B Cold Leg temperatures within 5°F.

Comment: SAT UNSAT Perform Step: 5 Record the following: (QSPDS page 611)

Standard: RECORD 611°F for REP CET (QSPDS A) and 612°F for REP CET (QSPDS B) temperatures.

Comment: SAT UNSAT Page 3 of 9 SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 6 Verify Acceptance Criteria:

  • REP CET Temperatures within 9°F?

Standard: CHECK YES box for REP CET temperatures within 9°F.

Comment: SAT UNSAT Perform Step: 7 Transfer the Highest operable Cold Leg Temperature of Step 2.1.1 into the "Low Limit" of Steps 2.1.6 and 2.1.8.

Standard: RECORD 541°F in "Low Limit Temp." box for Steps 2.1.6 and 2.1.8.

Comment: SAT UNSAT Perform Step: 8 Transfer the Lowest operable REP CET temperature of Step 2.1.1 into the "High Limit" of Steps 2.1.6 and 2.1.8.

Standard: RECORD 611°F in "High Limit Temp." box for Steps 2.1.6 and 2.1.8.

Comment: SAT UNSAT Perform Step: 9 Record CET Temperatures from QSPDS "A" Page 731:

  • Write N/A for G-20.

Standard: RECORD N/A for CET G-20 and RECORD CET Temperatures from QSPDS A Core Exit Thermocouple Map (JPM Cue Sheet).

Comment: SAT UNSAT Perform Step: 10 Record the total number of CETs which are within "In-Range" limits for each column.

Standard: RECORD the following from QSPDS A Core Exit Thermocouple Map:

  • QUAD 1 = 5; QUAD 2 = 6; QUAD 3 = 8; QUAD 4 = 6.

Comment: SAT UNSAT Perform Step: 11 At least two CETs per Column are "In-Range" for Channel "A" QSPDS:

YES NO Standard: CHECK YES box.

Comment: SAT UNSAT Page 4 of 9 SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 12 Record CET Temperatures from QSPDS "B" Page 731:

Standard: RECORD CET Temperatures from QSPDS B Core Exit Thermocouple Map (JPM Cue Sheet).

Comment: SAT UNSAT Perform Step: 13 Record the total number of CETs which are within the "In-Range" limits for each column.

Standard: RECORD the following from QSPDS B Core Exit Thermocouple Map:

  • QUAD 1 = 6; QUAD 2 = 7; QUAD 3 = 1; QUAD 4 = 6.

Comment: SAT UNSAT Perform Step: 14 At least two CETs per Column are "In-Range" for channel "B" QSPDS:

YES NO Standard: CHECK NO box.

Comment: SAT UNSAT Perform Step: 15 If any CETs are not "In-Range", then ensure a Notification has been initiated, and record NEW Notification numbers in the comments section.

Standard: ANNOTATE that a Notification for QSPDS B CET failure has been initiated in the COMMENTS Section.

Comment: SAT UNSAT Perform Step: 16 Heated Junction Thermocouple System Channel Check

  • Record the differential temperatures of the Heated Junction Thermocouples (HJTCs) from QSPDS Page 721 on Table 2.

Standard: RECORD the differential temperatures of the Heated Junction Thermocouples from QSPDS Page 721 on Table 2.

Comment: SAT UNSAT Page 5 of 9 SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 17 At least One Head differential temperature and at least Three Plenum differential temperatures for Channel A fall within the range of 40°F (lower limit) to 200°F (upper limit)?

YES NO Standard: CHECK YES box.

Comment: SAT UNSAT Perform Step: 18 At least One Head differential temperature and at least Three Plenum differential temperatures for Channel B fall within the range of 40°F (lower limit) to 200°F (upper limit)?

YES NO Standard: CHECK YES box.

Comment: SAT UNSAT Perform Step: 19 The Core Exit Thermocouple Channel Check is satisfactory by having selected YES in Steps 2.1.7 and 2.1.9.

SAT UNSAT Standard: CHECK UNSAT box.

Comment: SAT UNSAT Perform Step: 20 The Heated Junction Thermocouple System Channel Check is satisfactory by having selected YES in Steps 2.2.2 and 2.2.3.

SAT UNSAT Standard: CHECK SAT box.

Comment: SAT UNSAT Perform Step: 21 If either Step 3.1 or 3.2 is UNSAT, then for each equipment deficiency, ensure a separate LCOAR /EDMR and/or Notification exists. Record new LCOAR /EDMR/Notification numbers in the COMMENTS section.

Standard: RECORD in the COMMENTS section that a LCOAR must be initiated.

Comment: SAT UNSAT Page 6 of 9 SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 22 RECORD any Technical Specification LCO REQUIRED ACTIONS.

Standard: DETERMINE Technical Specification LCO 3.3.11 is applicable and record the following in the COMMENTS Section:

  • One or more Functions with one required channel inoperable; restore required channel to OPERABLE status within 30 days Terminating Cue: This JPM is complete.

Comment: SAT UNSAT STOP TIME:

Page 7 of 9 SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:

  • Unit 2 is in MODE 1 at 100% power.

INITIATING CUE: The Shift Manager directs you to PERFORM the following:

  • SO23-3-3.35, PAMI/Safe Shutdown Monthly Checks, Attachment 2, Core Exit Thermocouples and Heated Junction Thermocouple System Monthly Channel Checks.
  • RECORD any Technical Specification LCO REQUIRED ACTIONS in the Comments Section of SO23-3-3.35.

Page 8 of 9 SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 CHANNEL A CORE EXIT THERMOCOUPLE MAP DATA (PAGE 731)

QUADRANT 1 QUADRANT 2 QUADRANT 3 QUADRANT 4 1 W6 583°F 1 T18 591°F 1 G9 582°F 1 T2 593°F 2 W13 590°F 2 L13 573°F 2 G13 576°F 2 R4 587°F 3 W18 558°F 3 L16 584°F 3 E6 589°F 3 R6 612°F 4 T13 582°F 4 G16 588°F 4 E9 588°F 4 L2 575°F 5 T16 589°F 5 G18 589°F 5 C4 560°F 5 L9 573°F 6 G20 84°F 6 C9 591°F 6 G2 606°F 7 E20 553°F 7 C16 590°F 7 E4 589°F 8 A8 572°F 9 A14 540°F CHANNEL B CORE EXIT THERMOCOUPLE MAP (PAGE 731)

QUADRANT 1 QUADRANT 2 QUADRANT 3 QUADRANT 4 1 Y8 541°F 1 T20 548°F 1 E13 583°F 1 T4 593°F 2 Y14 563°F 2 R16 585°F 2 E16 611°F 2 R2 585°F 3 W4 - 3 R18 584°F 3 C6 - 3 L4 600°F 4 W9 610°F 4 R20 601°F 4 C13 612°F 4 L6 592°F 5 W16 598°F 5 L18 594°F 5 C18 - 5 G4 589°F 6 T6 585°F 6 L20 576°F 6 G6 608°F 7 T9 614°F 7 E18 588°F 7 E2 540°F 8 R9 585°F 9 R13 588°F Page 9 of 9 SONGS Oct 2009 NRC SRO Admin JPM A.2 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Facility: SONGS JPM # NRC SRO A.3 Task #192875 K/A #2.3.12 3.2/3.7

Title:

Determine Containment Access Requirements Examinee (Print):

Testing Method:

Simulated Performance: Classroom: X Actual Performance: X Simulator:

Plant:

READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.

When you complete the task successfully, the objective for this JPM will be satisfied.

Initial Conditions: Given the following conditions:

  • Unit 2 is in MODE 1 at 99.98% power.
  • Maintenance is planning a Containment entry to repair a steam leak by tightening the packing on a ME-088 instrument valve on the 63 foot elevation near Safety Injection Tank SIT-010.
  • Chemistry has sampled the containment atmosphere with the following results:
  • Combustible / Flammable Gas is 0.05%.

Initiating Cue: The Shift Manager directs you to PERFORM the following:

  • COMPLETE Attachment 1 of SO23-3-2.34, Containment Access Control, Inspections and Airlocks Operation.
  • DETERMINE any ventilation requirements prior to the entry and RECORD in the Comments Section of Attachment 1.
  • DETERMINE the proper Containment Closeout Inspection Attachment to be performed when work is complete and RECORD in the COMMENTS Section of Attachment 1.

Task Standard: Locate and correctly perform Critical Steps SO23-3-2.34.

Required Materials: SO23-3-2.34, Containment Access Control, Inspections and Airlocks Operation, Rev 22.

Achieved Validation Time: 10 minutes Time Critical: N/A Completion Time: ________ minutes Page 1 of 7 SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Comments:

Result: SAT UNSAT Examiner (Print / Sign): Date:

Page 2 of 7 SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 CLASSROOM SETUP EXAMINER:

PROVIDE the examinee with a copy of:

  • SO23-3-2.34, Containment Access Control, Inspections and Airlocks Operation.
  • INITIAL Attachment 1 through Step 1.1.
  • PROVIDE entire procedure.

Page 3 of 7 SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1

- Check Mark Denotes Critical Step START TIME:

Examiner Note: Examinee uses Section 6.8 as the reference for the following steps in Attachment 1.

Perform Step: 1 Check the appropriate conditions in the table per Main Body, Section 6.8.1 for Personnel and Emergency Airlocks or per SO23-5-1.8.1, Attachment for Shutdown Containment Closure Control for the Equipment Hatch.

Personnel Airlock Requirement(s):

  • Modes 1-4, ONE door and associated equalizing valve shall always remain CLOSED with interlocks installed and Operable.

ONE ramp is allowed.

Standard: REFER to 6.8.1 and DETERMINE that the Unit is in Mode 1; the condition applies, and CHECK this condition box.

Comment: SAT UNSAT Perform Step: 2 Check the appropriate conditions in the table per Main Body, Section 6.8.1 for Personnel and Emergency Airlocks or per SO23-5-1.8.1, Attachment for Shutdown Containment Closure Control for the Equipment Hatch.

Personnel Airlock Requirement:

  • Door operation will be: Electrical Manual N/A.

Standard: DETERMINE that Personnel Airlock Door is fully functional and CHECK the ELECTRICAL or MANUAL box.

Comment: SAT UNSAT Perform Step: 3 Check the appropriate conditions in the table per Main Body, Section 6.8.1 for Personnel and Emergency Airlocks or per SO23-5-1.8.1, Attachment for Shutdown Containment Closure Control for the Equipment Hatch.

Personnel Airlock Requirement:

  • Containment Airlock Operator (Hatch Operator) is required, and posted at outer door.

Standard: REFER to 6.8.1 and DETERMINE that the Unit is in Mode 1; the condition applies, and CHECK this condition box.

Comment: SAT UNSAT Page 4 of 7 SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 4 Check the appropriate conditions in the table per Main Body, Section 6.8.1 for Personnel and Emergency Airlocks or per SO23-5-1.8.1, Attachment for Shutdown Containment Closure Control for the Equipment Hatch.

Emergency Airlock Requirement:

  • Emergency Airlock to remain unlocked and posted by Security.

Emergency use only.

Standard: REFER to 6.8.1 and DETERMINE that two egress paths are always required and CHECK this condition box.

Comment: SAT UNSAT Perform Step: 5 Check the appropriate conditions in the table per Main Body, Section 6.8.1 for Personnel and Emergency Airlocks or per SO23-5-1.8.1, Attachment for Shutdown Containment Closure Control for the Equipment Hatch.

Equipment Hatch Requirement:

  • Equipment Hatch CLOSED Standard: REFER to 6.8.1 and DETERMINE that the Unit is in Mode 1; the condition applies, and CHECK this condition box.

Comment: SAT UNSAT Examiner Note: The examinee refers to Section 6.2, Containment Entry for the following step.

Perform Step: 6 Determine any ventilation requirements prior to the entry per Section 6.2, Containment Entry.

Standard: REFER to Section 6.2, Containment Entry:

  • DETERMINE that Chemistry sample results show an oxygen deficient atmosphere and PERFORM one (1) of the following:
  • DON Self-contained respiratory protection prior to Containment entry, or
  • PERFORM a Containment Mini-Purge.
  • RECORD this information in the Comments Section of Attachment 1.

Comment: SAT UNSAT Page 5 of 7 SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Examiner Note: The examinee refers to Section 6.9, Containment Loose Debris Inspections for the following step.

Perform Step: 7 Determine the proper Containment Closeout Inspection Attachment to be performed when work is complete per Section 6.9, Containment Loose Debris Inspections.

Standard: REFER to Section 6.9, Containment Loose Debris Inspections:

  • DETERMINE that when in MODE 1 or 2 an Inspection of < 7 work areas during or following a Containment entry and PERFORM Attachment 8, Containment Work Area Loose Debris Inspection.
  • RECORD this information in the Comments Section of Attachment 1.

Terminating Cue: This JPM is complete.

Comment: SAT UNSAT STOP TIME:

Page 6 of 7 SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:

  • Unit 2 is in MODE 1 at 99.98% power.
  • Maintenance is planning a Containment entry to repair a steam leak by tightening the packing on a ME-088 instrument valve on the 63 foot elevation near Safety Injection Tank SIT-010.
  • Chemistry has sampled the containment atmosphere with the following results:
  • Combustible / Flammable Gas is 0.05%.

INITIATING CUE: The Shift Manager directs you to PERFORM the following:

  • COMPLETE Attachment 1 of SO23-3-2.34, Containment Access Control, Inspections and Airlocks Operation.
  • DETERMINE any ventilation requirements prior to the entry and RECORD in the Comments Section of Attachment 1.
  • DETERMINE the proper Containment Closeout Inspection Attachment to be performed when work is complete and RECORD in the COMMENTS Section of Attachment 1.

Page 7 of 7 SONGS Oct 2009 NRC SRO Admin JPM A-3 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Facility: SONGS JPM # NRC SRO A.4 Task #192840 K/A #2.4.44 2.4/4.4

Title:

Determine Protective Actions Examinee (Print):

Testing Method:

Simulated Performance: Classroom: X Actual Performance: X Simulator:

Plant:

READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.

When you complete the task successfully, the objective for this JPM will be satisfied.

Initial Conditions: Given the following conditions:

  • Unit 3 has experienced a large break Loss of Coolant Accident with resultant fuel failure.
  • A GENERAL EMERGENCY (Tab B4-1) was declared and the following Protective Actions were recommended:
  • Evacuate State Beach.
  • Evacuate PAZ 1 and 4.
  • There has been a breach in the Containment Integrity resulting in a large airborne radioactive release.
  • The projected dose at the Exclusion Area Boundary is 5200 mR TEDE.
  • The current wind direction is from 101 degrees at 20 mph.
  • There are no known impediments to evacuation.
  • The release duration is unknown.

Initiating Cue: The Shift Manager directs you to EVALUATE conditions and determine if a new Protective Action Recommendation is required per SO123-VIII-10.3, Protective Action Recommendations.

  • DOCUMENT the results in the Meteorological Data box on EP(123)10, Event Notification Form.

Task Standard: Locate and correctly perform Critical Steps SO123-VIII-10.3.

Required Materials: SO123-VIII-10.3, Protective Action Recommendations, Rev. 12.

EP(123)10, Event Notification Form, Rev. 12.

Page 1 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Validation Time: 10 minutes Time Critical: N/A Completion Time: ________ minutes Comments:

Result: SAT UNSAT Examiner (Print / Sign): Date:

Page 2 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 CLASSROOM SETUP EXAMINER:

PROVIDE the examinee with a copy of:

  • SO123-VIII-10.3, Protective Action Recommendations.
  • EP(123)10, Event Notification Form.

Page 3 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1

- Check Mark Denotes Critical Step START TIME:

Perform Step: 1 If a PAR Upgrade is necessary, then obtain:

  • The 15-minute average wind direction (From), if available (Refer to Section 1.1 of this Attachment).
  • Information concerning KNOWN evacuation impediments (Refer to Section 1.2 of this Attachment).
  • Radiological release parameters (Refer to Section 1.3 of this Attachment).

Standard: DETERMINE from the initial conditions that the 15 min average wind direction is 101°, no known evacuation pediments exist, and that the projected dose at EAB is 5200 mR TEDE.

Comment: SAT UNSAT Examiner Note: The next set of steps follows the progression through Attachment 2 of SO123-VIII-10.3.

Perform Step: 2 Utilize the table (General Emergency PAR Table) found on page 3 of this Attachment and/or Attachment 2 (GE Protective Action Recommendations Flowchart) to make the appropriate GE PAR or GE PAR Upgrade..

Standard: ENTER Attachment 2, GE PAR flowchart at the General Emergency box.

Comment: SAT UNSAT Perform Step: 3 Utilize the table (General Emergency PAR Table) found on page 3 of this Attachment and/or Attachment 2 (GE Protective Action Recommendations Flowchart) to make the appropriate GE PAR or GE PAR Upgrade.

  • Are there known evacuation pediments?

Standard: DETERMINE that there are no known evacuation pediments, ANSWER NO, and TAKE the right hand path.

Comment: SAT UNSAT Page 4 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 4 Utilize the table (General Emergency PAR Table) found on page 3 of this Attachment and/or Attachment 2 (GE Protective Action Recommendations Flowchart) to make the appropriate GE PAR or GE PAR Upgrade.

  • Radiological Release less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />?

Standard: DETERMINE that the release duration is unknown, ANSWER UNKNOWN, and TAKE the straight through path.

Comment: SAT UNSAT Perform Step: 5 Utilize the table (General Emergency PAR Table) found on page 3 of this Attachment and/or Attachment 2 (GE Protective Action Recommendations Flowchart) to make the appropriate GE PAR or GE PAR Upgrade.

  • Dose 5000 mR (measured or projected) TEDE at the EAB and the wind towards PAZ 5?

Standard: DETERMINE that dose is 5000 mR but wind direction at 101° is NOT towards PAZ 5, ANSWER NO, and TAKE the path to the left.

Comment: SAT UNSAT Perform Step: 6 Utilize the table (General Emergency PAR Table) found on page 3 of this Attachment and/or Attachment 2 (GE Protective Action Recommendations Flowchart) to make the appropriate GE PAR or GE PAR Upgrade.

Standard: DETERMINE PAR to be:

  • Evacuate the State Beach.
  • Evacuate PAZ 1, 2, and 4 (affected downwind PAZs).

Comment: SAT UNSAT Perform Step: 7 Document PAR results on EP(123)10, Event Notification Form Standard: CHECK the is box as there is a need for protective action beyond the Exclusion Area Boundary.

Comment: SAT UNSAT Page 5 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 8 Document PAR results on EP(123)10, Event Notification Form Standard: CHECK the Evacuate State Beach box.

Comment: SAT UNSAT Perform Step: 9 Document PAR results on EP(123)10, Event Notification Form Standard: CHECK the Evacuate PAZ(s) box and CHECK boxes 1, 2, and 4.

Comment: SAT UNSAT Perform Step: 10 Document PAR results on EP(123)10, Event Notification Form Standard: CHECK the Ingest KI PAZ(s) box and CHECK boxes 1, 2, and 4.

Terminating Cue: This JPM is complete.

Comment: SAT UNSAT STOP TIME:

Page 6 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:

  • Unit 3 has experienced a large break Loss of Coolant Accident with resultant fuel failure.
  • A GENERAL EMERGENCY (Tab B4-1) was declared and the following Protective Actions were recommended:
  • Evacuate State Beach.
  • Evacuate PAZ 1 and 4.
  • There has been a breach in the Containment Integrity resulting in a large airborne radioactive release.
  • The projected dose at the Exclusion Area Boundary is 5200 mR TEDE.
  • The current wind direction is from 101 degrees at 20 mph.
  • There are no known impediments to evacuation.
  • The release duration is unknown.

INITIATING CUE: The Shift Manager directs you to EVALUATE conditions and determine if a new Protective Action Recommendation is required per SO123-VIII-10.3, Protective Action Recommendations.

  • DOCUMENT the results in the Meteorological Data box on EP(123)10, Event Notification Form.

Page 7 of 7 SONGS Oct 2009 NRC SRO Admin JPM A.4 Rev 0.doc

ES-301 Control Room / In-Plant Systems Outline Form ES-301-2 Facility: SONGS Units 2 and 3 Date of Examination: 10/19/09 Exam Level: RO SRO(I) SRO (U) Operating Test No.: NRC Control Room Systems@ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function S-1 001 - Control Rod Drive System (New) A, N, S 1 Perform Immediate Actions for Control Room Evacuation S-2 004 - Chemical and Volume Control System (J083S) D, S 2 Secure Charging and Letdown S-3 006 - Emergency Core Cooling System (J073S) A, M, EN, S 3 Align Simultaneous Hot Leg and Cold Leg Injection S-4 003 - Reactor Coolant Pump System (J027FS) A, D, L, S 4-P Start a Reactor Coolant Pump S-5 022 - Containment Spray System (J049FS) A, D, EN, S 5 Terminate Containment Spray S-6 064 - Emergency Diesel Generator System (J054S) D, S 6 Restore 1E Bus 2A06 From Cross-Tie Operations C-7 073 - Process Radiation Monitoring System (J120S) (RO only) C, D 7 Reset and Restore Fuel Handling Isolation System C-8 029 - Containment Purge System (J147FS) A, C, D 8 Place Containment Mini-Purge in Service In-Plant Systems@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)

P-1 059 - Main Feedwater System (J109) D 4-S Locally Operate Main Feedwater Regulating Valve P-2 004 - Chemical and Volume Control System (New) E, N, R 2 Locally Align Charging Pump Suction to RWST P-3 012 - Reactor Protection System (J021F) E, M, R 7 Locally Open Reactor Trip Breakers (TIME CRITICAL)

NUREG-1021, Revision 9.1 1 of 3 SONGS Oct 2009 NRC ES-301-2 Rev 1

ES-301 Control Room / In-Plant Systems Outline Form ES-301-2

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature - / - / 1 (control room system)

(L)ow Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator NRC JPM Examination Summary Description S-1 The candidate will perform the immediate operator actions for a Control Room Evacuation per Abnormal Operating Instruction SO23-13-02, Shutdown from Outside the Control Room. The alternate path is performed when a Reactor Coolant Pump breaker fails to open. This is a new JPM under the Control Rod Drive System - Reactivity Control safety function. This is a PRA significant action.

S-2 The candidate will secure Charging and Letdown as part of an RCS leak investigation per SO23-3-2.1.02, Chemical and Volume Control System Outage Evolutions. This is a bank JPM under the Chemical and Volume Control System -

Reactor Coolant Inventory Control safety function.

S-3 The candidate will align simultaneous Hot Leg and Cold Leg Injection during a Loss of Coolant Accident per SO23-12-11, EOI Supporting Attachments, Attachment 11, Simultaneous Hot / Cold Leg Injection. The alternate path requires the operator to perform actions with a High Pressure Safety Injection Pump out-of-service. This is a modified bank JPM under the Emergency Core Cooling System - Reactor Pressure Control safety function. This is a PRA significant action.

S-4 The candidate will start the fourth Reactor Coolant Pump during a Plant Startup per SO23-3-1.7, Reactor Coolant Pump Operation. The alternate path occurs when Component Cooling Water flow is lost to the RCP and the operator trips the Reactor Coolant Pump per the alarm response procedure. This is a bank JPM NUREG-1021, Revision 9.1 2 of 3 SONGS Oct 2009 NRC ES-301-2 Rev 1

ES-301 Control Room / In-Plant Systems Outline Form ES-301-2 under the Reactor Coolant Pump System - Heat Removal from Reactor Core safety function.

S-5 The candidate will be required to terminate Containment Spray per SO23-12-11, EOI Supporting Attachments, Attachment 2, Floating Steps. The alternate path occurs when there is only one Containment Emergency Cooling Unit operating and the actions of the RNO path are required. This is a bank JPM under the Containment Spray System - Containment Integrity safety function.

S-6 The candidate will be required to restore from 1E 4160V unit cross-tie operations per SO23-6-2, Transferring of 4 kV Buses, Section 6.9, Restoring from 1E 4kV Bus 3A06 to 2A06 Cross-Tie Operation. This is a bank JPM under the AC Electrical Distribution System - Electrical safety function.

C-7 The candidate will reset and re-establish normal Fuel Building Ventilation after isolation due to a high radiation signal per SO23-3-2.22, Engineered Safety Features Actuation Systems Operation, Attachment 23, FHIS Reset and Restoration. This is a bank JPM under the Area Radiation Monitoring System -

Instrumentation safety function.

C-8 The candidate will place the Containment Mini-Purge System in operation to support a Containment entry per SO23-1-4.2, Containment Purge and Recirculation Filtration System. The alternate path occurs when a Containment Radiation High alarm is received and the operator isolates mini-purge per the alarm response. This is a bank JPM under the Containment Purge System - Plant Service Systems safety function.

P-1 The candidate will perform the local actions to operate a Main Feedwater Regulating Valve per SO23-9-6, Feedwater Control System Operation, Section 6.4, Local-Manual Operation of Main Feedwater Control Valves. This is a bank JPM under the Main Feedwater System - Secondary System Heat Removal from Reactor Core safety function.

P-2 The candidate will perform the actions to align Charging Pump suction to the Refueling Water Storage Tank per SO23-13-2, Shutdown from Outside the Control Room, Attachments 10 and 11. This is a new JPM under the Chemical and Volume Control System - Reactor Coolant System Inventory Control safety function. This is a PRA significant action.

P-3 The candidate will log into and enter the Radiation Controlled Area and locally open Reactor Trip breakers per SO23-12-1, Standard Post Trip Actions. This is a time critical, modified bank JPM under the Reactor Protection System -

Instrumentation safety function. This is a PRA significant action.

NUREG-1021, Revision 9.1 3 of 3 SONGS Oct 2009 NRC ES-301-2 Rev 1

Appendix C JPM WORKSHEET Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC C-7 Task #186190 K/A #073.A4.02 3.7 / 3.7 SF-7

Title:

Reset and Restoration of Fuel Handling Isolation System Examinee (Print):

Testing Method:

Simulated Performance: X Classroom:

Actual Performance: Simulator:

Plant: X READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.

When you complete the task successfully, the objective for this JPM will be satisfied.

Initial Conditions: Given the following conditions:

  • An actuation of Unit 2 (Unit 3) Train A Fuel Handling Isolation System (FHIS) has occurred due to radiography in the area.
  • Radiography has been stopped.
  • Proper actuation of Unit 2 (Unit 3) Train A FHIS has been verified.
  • The actuation occurred less than 15 minutes ago and SO23-1-3.1, Emergency Chilled Water System Operation, Section for Prevention of Low Load Recycle was not performed.

Initiating Cue: The Control Room Supervisor directs you to RESTORE the Unit 2 (Unit 3)

Train A Fuel Handling Isolation System per SO23-3-2.22, Engineered Safety Features Actuation System Operation, Attachment 23, FHIS Reset and Restoration.

Task Standard: Locate and correctly perform Critical Steps of SO23-3-2.22.

Required Materials: SO23-3-2.22, Engineered Safety Features Actuation System Operation, Rev. 17.

Validation Time: 19 minutes Time Critical: N/A Completion Time: ________ minutes Comments:

Result: SAT UNSAT Examiner (Print / Sign): Date:

Page 1 of 9 SONGS Oct 2009 NRC JPM C-7 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 CONTROL ROOM SETUP EXAMINER:

PROVIDE the examinee with a copy of:

  • SO23-3-2.22, Engineered Safety Features Actuation Systems Operation, Attachment 23, FHIS Reset and Restoration.
  • INITIAL through Step 2.1.

EXAMINER NOTE:

This JPM can be performed on either Unit. CIRCLE the Unit on which the JPM is to be performed on the JPM Worksheet and the JPM Cue Sheet.

Panel 2(3)L-103 is located in the Control Room Hallway and Panel 2(3)L-154 is located in the Control Room Hallway past the Fire Door.

Page 2 of 9 SONGS Oct 2009 NRC JPM C-7 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1

- Check Mark Denotes Critical Step START TIME:

Examiner Cue: Remind the examinee to simulate all actions.

Perform Step: 1 MOMENTARILY DEPRESS RESET/TEST handswitch HS-7822H1 and/or HS-7823H2, as applicable to reset FHIS.

Standard: DEPRESS 2(3)HS-7822H1 FHIS TR A RESET/TEST handswitch.

Comment: SAT UNSAT Perform Step: 2 Verify handswitch backlight illuminates (L-103).

Standard: OBSERVE 2(3)HS-7822H1 FHIS TR A RESET/TEST white light illuminated.

Examiner Cue: The RESET/TEST light is illuminated.

Comment: SAT UNSAT Perform Step: 3 VERIFY 60A22, FHIS ACTUATION, has reset.

Standard: GO to Annunciator Panel 60A and OBSERVE annunciator 60A22 - FHIS ACTUATION is extinguished.

Examiner Cue: Annunciator window 60A22 is extinguished.

Comment: SAT UNSAT Perform Step: 4 PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:

  • E-370 FHB Post-Accident Cleanup Unit - STOP.

Standard: DEPRESS 2(3)HS-9850-1, FHB Post ACDT Cleanup Unit 2(3)E370 STOP pushbutton and OBSERVE green STOP light illuminated.

Examiner Cue: The stop light is illuminated.

Comment: SAT UNSAT Page 3 of 9 SONGS Oct 2009 NRC JPM C-7 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 5 PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:

  • HV-9850 FHB PACU E-370 Isolation Damper [1] - CLOSED Standard: OBSERVE 2(3)HV-9850, FHB Post ACDT Cleanup Unit 2(3)E370 Isolation Damper green CLOSE light illuminated and red OPEN light extinguished.

Examiner Cue: The damper is closed.

Comment: SAT UNSAT Examiner Note: Heaters operate automatically with the associated cleanup unit.

Perform Step: 6 PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:

  • E-464, FHB PACU E-370 Heaters ZL-9865 - OFF Standard: VERIFY 2(3)E464, FHB Post ACDT Cleanup Unit 2(3)370 Heater is OFF and OBSERVE green OFF light illuminated on 2(3)ZL-9865.

Examiner Cue: The heater is off.

Comment: SAT UNSAT Perform Step: 7 PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:

  • E-652, FHB PACU E-370 Heaters ZL-9865B1 - OFF Standard: VERIFY 2(3)E652, FHB Post ACDT Cleanup Unit 2(3)E370 Heater is OFF by OBSERVE green OFF light illuminated on 2(3)ZL-9865B1.

Examiner Cue: The heater is off.

Comment: SAT UNSAT Perform Step: 8 PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:

  • HV-9846 FHB Train A Air Supply Isol Damper - OPEN Standard: DEPRESS 2(3)HV-9846, FHB Air Supply ISO Damper OPEN pushbutton and OBSERVE red OPEN light illuminated and green CLOSE light extinguished.

Examiner Cue: The damper is open.

Comment: SAT UNSAT Page 4 of 9 SONGS Oct 2009 NRC JPM C-7 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 9 PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:

  • HV-9847 FHB Train A Air Exhaust Isol Damper - OPEN Standard: DEPRESS 2(3)HV-9847, FHB Air Exhaust ISO Damper OPEN pushbutton and OBSERVE red OPEN light illuminated and green CLOSE light extinguished.

Examiner Cue: The damper is open.

Comment: SAT UNSAT Perform Step: 10 PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:

  • HV-9847B FHB Train A Air Exhaust Isol Damper - OPEN Standard: DEPRESS 2(3)HV-9847B, FHB Air Exhaust ISO Damper OPEN pushbutton and OBSERVE red OPEN light illuminated and green CLOSE light extinguished.

Examiner Cue: The damper is open.

Comment: SAT UNSAT Perform Step: 11 PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:

  • HV-9847C FHB Train A Air Exhaust Isol Damper - OPEN Standard: DEPRESS 2(3)HV-9847C, FHB Air Exhaust ISO Damper OPEN pushbutton and OBSERVE red OPEN light illuminated and green CLOSE light extinguished.

Examiner Cue: The damper is open.

Comment: SAT UNSAT Perform Step: 12 PERFORM the following alignment to restore FHIS Train A components to normal on CR-60:

  • E-441 FHB Pump Room Cooling Unit STOP Standard: DEPRESS 2(3)HS-9836-1, FHB Pump Room CLG Unit 2(3)E441 STOP pushbutton and OBSERVE green STOP light illuminated.

Examiner Cue: The cooling unit is off.

Comment: SAT UNSAT Page 5 of 9 SONGS Oct 2009 NRC JPM C-7 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 13 RESTORE Train A loads that were placed in service by SO23-1-3.1, Section for Prevention of Low Load Recycle.

Standard: DETERMINE that Train A load restoration is NOT required based on the Initial Conditions.

Examiner Cue: Train A load restoration is NOT required.

Comment: SAT UNSAT Examiner Cue: Chiller is NOT required for plant operation.

Perform Step: 14 PERFORM the following alignment to continue restoration of FHIS Train A components to normal on CR-60:

  • E-336 Control Building Emergency Chiller [2] - STOP Standard: DEPRESS 2/3HS-9875-1 or 2/3HS-9875C1, 2/3E336 EMER CHLD Water Chiller STOP pushbutton and OBSERVE green STOP light illuminated.

Examiner Cue: The chiller is off.

Comment: SAT UNSAT Perform Step: 15 PERFORM the following alignment to continue restoration of FHIS Train A components to normal on CR-60:

  • P-162 E-336 Chilled Water Pump [2] - STOP Standard: DEPRESS 2/3HS-9872-1, 2/3P162 EMER CHLD Water Pump STOP pushbutton and OBSERVE green STOP light illuminated.

Examiner Cue: The pump is off.

Comment: SAT UNSAT Perform Step: 16 PERFORM the following alignment to continue restoration of FHIS Train A components to normal on CR-60:

  • A-053 Emerg. Chiller Rm A Vent (Supply) [2] - STOP Standard: DEPRESS 2/3HS-9774-1, EMER Chiller Room A Vent Supply Unit 2/3A053 STOP pushbutton and OBSERVE green STOP light illuminated.

Examiner Cue: The supply unit is off.

Comment: SAT UNSAT Page 6 of 9 SONGS Oct 2009 NRC JPM C-7 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 17 PERFORM the following alignment to continue restoration of FHIS Train A components to normal on CR-60:

  • A-056 Emerg. Chiller Rm A Vent (Exhaust) [2] - STOP Standard: DEPRESS 2/3HS-9775-1, EMER Chiller Room A Vent Exhaust Unit 2/3A056 STOP pushbutton and OBSERVE green STOP light illuminated.

Examiner Cue: The supply unit is off.

Comment: SAT UNSAT Examiner Note: The examinee may start either supply and exhaust fans and the actions would be reversed. The fans are electrically interlocked so that no more than one of each may run.

Perform Step: 18 At HVAC Panel L-154 ENSURE the following alignment:

  • A-359 FHB Ventilation Normal Supply Fan [3] - STOP/START Standard: TURN 2(3)HS-9830A, FHB Ventilation Normal Supply Fan 2(3)A359 START switch and OBSERVE red START light illuminated and CIRCLE START.

Examiner Cue: The fan is running.

Comment: SAT UNSAT Perform Step: 19 At HVAC Panel L-154 ENSURE the following alignment:

  • A-360 FHB Ventilation Standby Supply Fan [3] - STOP/START Standard: DETERMINE only one supply fan is required and OBSERVE 2(3)HS-9830B, FHB Ventilation Standby Supply Fan 2(3)A-360 green STOP light illuminated and CIRCLE STOP.

Examiner Cue: The fan is off.

Comment: SAT UNSAT Perform Step: 20 At HVAC Panel L-154 ENSURE the following alignment:

  • A-316 FHB Ventilation Standby Exhaust Fan [3] - STOP/START Standard: DETERMINE only one exhaust fan is required and OBSERVE 2(3)HS-9848, FHB Ventilation Standby Exhaust Fan 2(3)A316 green STOP light illuminated and CIRCLE STOP.

Examiner Cue: The fan is off.

Comment: SAT UNSAT Page 7 of 9 SONGS Oct 2009 NRC JPM C-7 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 21 At HVAC Panel L-154 ENSURE the following alignment:

  • A-317 FHB Ventilation Normal Exhaust Fan [3] - STOP/START Standard: TURN OBSERVE 2(3)HS-9849, FHB Ventilation Normal Exhaust Fan 2(3)A317 START switch and OBSERVE red START light illuminated and CIRCLE START.

Examiner Cue: The fan is running.

Comment: SAT UNSAT Perform Step: 22 At HVAC Panel L-154 ENSURE the following alignment:

  • E-464 FHB PACU E-370 Heaters HS-9865 AUTO Standard: VERIFY 2(3)HS-9865-1, FHB CLEANUP 2(3)E370 INLET HEATER 2(3)E464 is selected to AUTO.

Examiner Cue: HS-9865-1 is in AUTO.

Comment: SAT UNSAT Perform Step: 23 At HVAC Panel L-154 ENSURE the following alignment:

  • E-652 FHB PACU E-370 Heaters HS-9865B1 - AUTO Standard: VERIFY 2(3)HS-9865B1, FHB CLEANUP 2(3)E370 INLET HEATER 2(3)E652 selected to AUTO.

Examiner Cue: HS-9865B1 is in AUTO.

Comment: SAT UNSAT Perform Step: 24 At HVAC Panel L-154 ENSURE the following alignment:

  • E-465 FHB PACU E-371 Heaters HS-9866 AUTO Standard: VERIFY 2(3)HS-9866-2, FHB CLEANUP 2(3)E371 INLET HEATER 2(3)E465 selected to AUTO.

Terminating Cue: HS-9866-2 is in AUTO. This JPM is complete.

Comment: SAT UNSAT STOP TIME:

Page 8 of 9 SONGS Oct 2009 NRC JPM C-7 Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:

  • An actuation of Unit 2 (Unit 3) Train A Fuel Handling Isolation System (FHIS) has occurred due to radiography in the area.
  • Radiography has been stopped.
  • Proper actuation of Unit 2 (Unit 3) Train A FHIS has been verified.
  • The actuation occurred less than 15 minutes ago and SO23-1-3.1, Emergency Chilled Water System Operation, Section for Prevention of Low Load Recycle was not performed.

INITIATING CUE: The Control Room Supervisor directs you to RESTORE the Unit 2 (Unit 3) Train A Fuel Handling Isolation System per SO23-3-2.22, Engineered Safety Features Actuation System Operation, Attachment 23, FHIS Reset and Restoration.

Page 9 of 9 SONGS Oct 2009 NRC JPM C-7 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC C-8 Task #193205 K/A #029 A3.01 3.8/4.0 SF-8

Title:

Place Containment Mini-Purge in Service Examinee (Print):

Testing Method:

Simulated Performance: X Classroom:

Actual Performance: Simulator:

Plant: X READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.

When you complete the task successfully, the objective for this JPM will be satisfied.

Initial Conditions: Given the following conditions:

  • Unit 2 (Unit 3) is operating at full power.
  • A Containment entry must be made to investigate an abnormal noise in a Reactor Coolant Pump.
  • Prior to the entry, a Containment Mini-Purge is to be performed.
  • 2(3)RT-7828, Containment Purge Stack Radiation Monitor is out-of-service.

Initiating Cue: The Control Room Supervisor directs you to INITIATE a Unit 2 (Unit 3)

Containment Mini-Purge per SO23-1-4.2, Containment Purge and Recirculation Filtration System.

  • Attachment 6, Operation of the Containment Mini-Purge System has been completed through Step 2.4.3.
  • 2(3)RT-7865, Plant Vent Stack/Containment Purge Stack Wide Range Gas Monitor is aligned to the Containment Purge Stack.

Task Standard: Locate and correctly perform Critical Steps of SO23-1-4.2 and 57C10.

Required Materials: SO23-1-4.2, Containment Purge and Recirculation Filtration System, Rev. 28.

SO23-15-57.C, 57C10 - CONTAINMENT RADIATION HI, Rev. 18.

Validation Time: 13 minutes Time Critical: N/A Completion Time: ________ minutes Comments:

Result: SAT UNSAT Page 1 of 8 SONGS Oct 2009 NRC JPM C-8 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Examiner (Print / Sign): Date:

CONTROL ROOM SETUP EXAMINER:

PROVIDE the examinee with a copy of:

  • SO23-1-4.2, Containment Purge and Recirculation Filtration System, Attachment 6.
  • INITIAL through Step 2.4.3. This will make Section 2.5, Start Mini-Purge, as the next step to be performed.

EXAMINER NOTE:

This JPM can be performed on either Unit. CIRCLE the Unit on which the JPM is to be performed on the JPM Worksheet and the JPM Cue Sheet.

Page 2 of 8 SONGS Oct 2009 NRC JPM C-8 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1

- Check Mark Denotes Critical Step START TIME:

Examiner Note: Normally to prevent RT-7828/RT-7865-1 from tripping on low sample flow, Steps 2.5.1 through 2.5.5 must be completed within 60 seconds of the Monitor Process Flow reaching a value of < 900 SCFM and normally two operators are required.

Examiner Cue: Remind the examinee to simulate all actions. The examiner will act as Chemistry.

Perform Step: 1 ENSURE OPEN HV-9825, Containment Mini-Purge Exhaust 2(3)MA-059 Isolation Valve (Outside Containment).

Standard: DEPRESS 2(3)HV-9825, CNTMT MINI PRG EXH 2(3)A059 ISO VALVE red OPEN pushbutton and OBSERVE red OPEN light illuminated and green CLOSE light extinguished.

Examiner Cue: HV-9825 is open.

Comment: SAT UNSAT Perform Step: 2 ENSURE OPEN HV-9824, Containment Mini-Purge Exhaust 2(3)MA-059 Isolation Valve (Inside Containment).

Standard: DEPRESS 2(3)HV-9824, CNTMT MINI PRG EXH 2(3)A059 ISO VALVE red OPEN pushbutton and OBSERVE red OPEN light illuminated and green CLOSE light is extinguished.

Examiner Cue: HV-9824 is open.

Comment: SAT UNSAT Perform Step: 3 ENSURE OPEN HV-9823, Containment Mini-Purge Supply 2(3)MA-379 Isolation Valve. (Inside Containment)

Standard: DEPRESS 2(3)HV-9823, CNTMT MINI PRG SPLY 2(3)A379 ISO VALVE OPEN pushbutton and OBSERVE red OPEN light illuminated and green CLOSE light extinguished.

Examiner Cue: HV-9823 is open.

Comment: SAT UNSAT Page 3 of 8 SONGS Oct 2009 NRC JPM C-8 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 4 ENSURE OPEN HV-9821, Containment Mini-Purge Supply 2(3)MA-379 Isolation Valve (Outside Containment).

Standard: DEPRESS 2(3)HV-9821, CNTMT MINI PRG SPLY 2(3)A379 ISO VALVE OPEN pushbutton and OBSERVE red OPEN lamp illuminated and green CLOSE light extinguished.

Examiner Cue: HV-9821 is open.

Comment: SAT UNSAT Examiner Note: Fan controls are at Panel 2(3)L-155 in the Control Room hallway.

Perform Step: 5 START 2(3)MA-059, Mini-Purge Exhaust Unit, by Positioning 2(3)HS-9804 to START.

Standard: TURN 2(3)HS-9804, Cont Mini-Purge Exhaust Unit 2(3)A059 switch to START and OBSERVE red 2(3)ZL-9804 START light illuminated.

Examiner Cue: 2(3)MA-059 red start light is illuminated.

Comment: SAT UNSAT Perform Step: 6 START 2(3)MA-379, Mini-Purge Supply Unit, by Positioning 2(3)HS-9803 to START.

Standard: TURN 2(3)HS-9803, Cont Mini-Purge Supply Unit 2(3)A379 switch to START and OBSERVE red 2(3)ZLH-9804 START light illuminated.

Examiner Cue: 2(3)MA-379 red start light is illuminated.

Comment: SAT UNSAT Perform Step: 7 Notify Chemistry Division that Mini-Purge is in progress.

Standard: NOTIFY Chemistry Division that Mini-Purge is in progress and RECORD the chemists name.

Examiner Cue: Chemistry Tech Jones acknowledges Containment Mini-Purge in service on Unit 2 (Unit 3).

Examiner Cue: The release limit is 1800 SCFM.

Examiner Cue: Steps 2.5.8, 2.5.9, and 2.5.10 have been completed by another operator.

Examiner Cue: Annunciator 57C10, CONTAINMENT RADIATION HIGH is alarming.

Comment: SAT UNSAT Page 4 of 8 SONGS Oct 2009 NRC JPM C-8 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Examiner Note: The following steps constitute the alternate path for this JPM.

Perform Step: 8 Acknowledge annunciator 57C10, CONTAINMENT RADIATION HIGH.

Standard: DEPRESS Alarm Acknowledge button for Panel 57C and OBSERVE Annunciator 57C10 - CONTAINMENT RADIATION HIGH illuminated.

Examiner Cue: Annunciator 57C10 is solidly lit, not flashing.

Comment: SAT UNSAT Examiner Note: Examinee should refer to SO23-15-57.C, 57C10, CONTAINMENT RADIATION HIGH (provide copy if referenced).

Examiner Note: Actuation of the Containment Purge Isolation System (CPIS) will satisfy the critical steps for closing the mini-purge supply and exhaust valves.

Perform Step: 9 Containment Normal or Mini Purge in progress: If 2(3)RE-7828, or 2(3)RE-7865 (if aligned to the Containment Purge Stack) alarms High radiation, then ensure the following has occurred:

  • 2(3)HV-9948, Containment Normal Purge Isolation - CLOSED.

Standard: OBSERVE 2(3)HV-9948, CNTMT PRG SPLY UNIT 2(3)A060 green CLOSE light illuminated and red OPEN light extinguished.

Examiner Cue: HV-9948 is closed.

Comment: SAT UNSAT Perform Step: 10 Containment Normal or Mini Purge in progress: If 2(3)RE-7828, or 2(3)RE-7865 (if aligned to the Containment Purge Stack) alarms High radiation, then ensure the following has occurred:

  • 2(3)HV-9951, Containment Normal Purge Isolation - CLOSED.

Standard: OBSERVE 2(3)HV-9951, CNTMT PRG EXH UNIT 2(3)A060 green CLOSE light illuminated and red OPEN light extinguished.

Examiner Cue: HV-9951 is closed.

Comment: SAT UNSAT Page 5 of 8 SONGS Oct 2009 NRC JPM C-8 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 11 Containment Normal or Mini Purge in progress: If 2(3)RE-7828, or 2(3)RE-7865 (if aligned to the Containment Purge Stack) alarms High radiation, then ensure the following has occurred:

  • 2(3)HV-9921, CNTMT MINI PRG SPLY 2(3)A379 ISO VALVE -

CLOSED.

Standard: OBSERVE 2(3)HV-9921, CNTMT MINI PRG SPLY 2(3)A379 ISO VALVE green CLOSE light illuminated and red OPEN light extinguished.

Examiner Cue: HV-9921 is open.

Comment: SAT UNSAT Perform Step: 12 Ensure CLOSED 2(3)HV-9921, CNTMT MINI PRG SPLY 2(3)A379 ISO VALVE.

Standard: DEPRESS 2(3)HV-9921, CNTMT MINI PRG SPLY 2(3)A379 ISO VALVE CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished.

Examiner Cue: HV-9921 is closed.

Comment: SAT UNSAT Perform Step: 13 Containment Normal or Mini Purge in progress: If 2(3)RE-7828, or 2(3)RE-7865 (if aligned to the Containment Purge Stack) alarms High radiation, then ensure the following has occurred:

  • 2(3)HV-9925, Containment Mini-Purge Exhaust 2(3)MA-059 -

CLOSED.

Standard: OBSERVE 2(3)HV-9925, CNTMT MINI PRG EXH 2(3)A059 ISO VALVE green CLOSE light illuminated and red OPEN light extinguished.

Examiner Cue: HV-9925 is open.

Comment: SAT UNSAT Perform Step: 14 Ensure CLOSED 2(3)HV-9925, Containment Mini-Purge Exhaust 2(3)MA-059.

Standard: DEPRESS 2(3)HV-9925, CNTMT MINI PRG EXH 2(3)A059 ISO VALVE CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished.

Examiner Cue: HV-9925 is closed.

Comment: SAT UNSAT Page 6 of 8 SONGS Oct 2009 NRC JPM C-8 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 15a Containment Normal or Mini Purge in progress: If 2(3)RE-7828, or 2(3)RE-7865 (if aligned to the Containment Purge Stack) alarms High radiation, then ensure the following has occurred:

  • 2(3)MA-374, 2(3)MA-060, 2(3)MA-379, and 2(3)MA-059, Containment Normal and Mini-Purge Supply and Exhaust Fans are STOPPED.

Standard: At Panel 2(3)L-155, OBSERVE Containment Normal Purge Supply and Exhaust Fans green STOP lights are illuminated:

  • CNTMT Purge Supply Fan 2(3)A374.
  • CNTMT Purge Exhaust Fan 2(3)A060.

Examiner Cue: The Normal Purge Supply and Exhaust fans are stopped.

Comment: SAT UNSAT Perform Step: 15b Containment Normal or Mini Purge in progress: If 2(3)RE-7828, or 2(3)RE-7865 (if aligned to the Containment Purge Stack) alarms High radiation, then ensure the following has occurred:

  • 2(3)MA-374, 2(3)MA-060, 2(3)MA-379, and 2(3)MA-059, Containment Normal and Mini-Purge Supply and Exhaust Fans are STOPPED.

Standard: At Panel 2(3)L-155, OBSERVE Containment Mini-Purge Supply and Exhaust Fans green STOP lights are illuminated:

  • CNTMT Mini-Purge Supply Fan 2(3)A379.
  • CNTMT Mini-Purge Exhaust Fan 2(3)A059.

Terminating Cue: The Mini-Purge Supply and Exhaust fans are stopped. This JPM is complete.

Comment: SAT UNSAT STOP TIME:

Page 7 of 8 SONGS Oct 2009 NRC JPM C-8 Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:

  • Unit 2 (Unit 3) is operating at full power.
  • A Containment entry must be made to investigate an abnormal noise in a Reactor Coolant Pump.
  • Prior to the entry, a Containment Mini-Purge is to be performed.
  • 2(3)RT-7828, Containment Purge Stack Radiation Monitor is out-of-service.

INITIATING CUE: The Control Room Supervisor directs you to INITIATE a Unit 2 (Unit 3) Containment Mini-Purge per SO23-1-4.2, Containment Purge and Recirculation Filtration System.

  • Attachment 6, Operation of the Containment Mini-Purge System has been completed through Step 2.4.3.
  • 2(3)RT-7865, Plant Vent Stack/Containment Purge Stack Wide Range Gas Monitor is aligned to the Containment Purge Stack.

Page 8 of 8 SONGS Oct 2009 NRC JPM C-8 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC P-1 Task #151078 K/A #059 A2.12 3.1/3.4 SF-4S

Title:

Local-Manual Operation of Main Feedwater Control Valve Examinee (Print):

Testing Method:

Simulated Performance: X Classroom:

Actual Performance: Simulator:

Plant: X READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.

When you complete the task successfully, the objective for this JPM will be satisfied.

Initial Conditions: Given the following conditions:

  • Unit 2 (Unit 3) is at 100% power.
  • Maintenance is to be performed on the Positioner Controller for the Unit 2 (Unit 3) Main Feedwater Control Valve, 2(3)FV-1111.
  • This will require Local-Manual operation of the Unit 2 (Unit 3) Main Feedwater Control Valve, 2(3)FV-1111.

Initiating Cue: The Control Room Supervisor DIRECTS you to take LOCAL-MANUAL Control of the Unit 2 (Unit 3) 2(3)FV-1111, Main Feedwater Control Valve, per SO23-9-6, Feedwater Control System Operation, Section 6.3, Local-Manual Operation of Main Feedwater Control Valves.

Task Standard: Locate and correctly perform Critical Steps of SO23-9-6.

Required Materials: SO23-9-6, Feedwater Control System Operation, Rev. 22 Validation Time: 7 minutes Time Critical: N/A Completion Time: ________ minutes Comments:

Result: SAT UNSAT Examiner (Print / Sign): Date:

Page 1 of 5 SONGS Oct 2009 NRC JPM P-1 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 PLANT SETUP EXAMINER:

PROVIDE the examinee with a copy of:

  • SO23-9-6, Feedwater Control System Operation, Section 6.3, Local-Manual Operation of Main Feedwater Control Valves.

EXAMINER NOTE:

This JPM can be performed on either Unit. CIRCLE the Unit on which the JPM is to be performed on the JPM Worksheet and the JPM Cue Sheet.

Page 2 of 5 SONGS Oct 2009 NRC JPM P-1 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1

- Check Mark Denotes Critical Step START TIME:

Examiner Cue: Remind the examinee to simulate all actions.

Perform Step: 1 Establish communications between CR and Operator at the MFW Control Valve.

Standard: ESTABLISH communications with the Control Room.

Examiner Cue: Communications are established.

Comment: SAT UNSAT Perform Step: 2 TRANSFER 2(3)FV-1111, MFW Control Valve Controller, to LOCAL.

(CR-52)

Standard: DIRECT the Control Room to TRANSFER 2(3)FV-1111, Main Feedwater Control Valve Controller to LOCAL.

Examiner Cue: 2(3)FV-1111 is in LOCAL.

Comment: SAT UNSAT Perform Step: 3 TURN LARGE HANDWHEEL CLOCKWISE until snug at limit of travel.

(At this point, the large lead screw contacts the mechanical actuating device and further movement will cause actual valve movement.)

Standard: TURN 2(3)FV-1111, MFW Control Valve large handwheel CLOCKWISE until snug at limit of travel.

Examiner Cue: The large handwheel is snug at the limit of travel.

Comment: SAT UNSAT Perform Step: 4 TURN SMALL HANDWHEEL COUNTERCLOCKWISE until tight against hub of large handwheel.

Standard: TURN 2(3)FV-1111, MFW Control Valve small handwheel COUNTERCLOCKWISE until tight against hub of large handwheel.

Examiner Cue: The small handwheel is tight against hub of large handwheel.

Comment: SAT UNSAT Page 3 of 5 SONGS Oct 2009 NRC JPM P-1 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 5 OPEN the two (black knob handled) Operating Piston Air Bypass Valves.

Standard: TURN 2(3)FV-1111, MFW Control Valve both (black knob handled)

Operating Piston Air Bypass Valves COUNTERCLOCKWISE to OPEN.

Examiner Cue: Both Operating Piston Air Bypass Valves are open.

Comment: SAT UNSAT Perform Step: 6 CLOSE Air Supply to FY-1111:

S2(3)2417MR239 Standard: TURN S2(3)2417MR239, Air Supply to 2(3)FY-1111, CLOCKWISE to CLOSE.

Examiner Cue: The air supply to 2(3)FY-1111 is closed.

Comment: SAT UNSAT Perform Step: 7 CLOSE Air Supply to FY-1114:

S2(3)2417MR240 Standard: TURN S2(3)2417MR240, Air Supply to I/P Converter 2(3)FY-1114 CLOCKWISE to CLOSE.

Examiner Cue: The air supply to 2(3)FY-1114 is closed.

Comment: SAT UNSAT Examiner Cue: The Control Room directs you to open 2(3)FV-1111 one-half turn.

Perform Step: 8 OPERATE the large handwheel to reposition valve as directed by the Control Room or CRS.

  • Rotating handwheel clockwise Closes valve.
  • Rotating handwheel counterclockwise Opens valve Standard: TURN 2(3)FV-1111, Main Feedwater Control Valve Large handwheel one-half (1/2) turn in the COUNTERCLOCKWISE direction.

Terminating Cue: 2(3)FV-1111 has OPENED one-half turn. This JPM is complete.

Comment: SAT UNSAT STOP TIME:

Page 4 of 5 SONGS Oct 2009 NRC JPM P-1 Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:

  • Unit 2 (Unit 3) is at 100% power.
  • Maintenance is to be performed on the Positioner Controller for the Unit 2 (Unit 3) Main Feedwater Control Valve, 2(3)FV-1111.
  • This will require Local-Manual operation of the Unit 2 (Unit 3) Main Feedwater Control Valve, 2(3)FV-1111.

INITIATING CUE: The Control Room Supervisor DIRECTS you to take LOCAL-MANUAL Control of the Unit 2 (Unit 3) 2(3)FV-1111, Main Feedwater Control Valve, per SO23-9-6, Feedwater Control System Operation, Section 6.3, Local-Manual Operation of Main Feedwater Control Valves.

Page 5 of 5 SONGS Oct 2009 NRC JPM P-1 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC P-2 Task #191625 K/A #004 A2.14 3.8/3.9 SF-2

Title:

Locally Align Charging Pump Suction to the Refueling Water Storage Tank Examinee (Print):

Testing Method:

Simulated Performance: X Classroom:

Actual Performance: Simulator:

Plant: X READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.

When you complete the task successfully, the objective for this JPM will be satisfied.

Initial Conditions: Given the following conditions:

  • The Control Room has been evacuated per SO23-13-2, Shutdown from Outside the Control Room and a cooldown to Cold Shutdown is in progress.
  • The Boric Acid Makeup (BAMU) Tanks are aligned for gravity feed on Unit 2 (Unit 3).

Initiating Cue: The Control Room Supervisor directs you to MONITOR BAMU Tank levels and when required, SHIFT Charging Pump suction to the Refueling Water Storage Tank per SO23-13-2, Shutdown From Outside the Control Room:

  • Attachment 10, Radwaste Operator Duties for Unit 2.
  • Attachment 11, Auxiliary Primary Operator Duties for Unit 3.

Task Standard: Locate and correctly perform Critical Steps of SO23-13-2.

Required Materials: SO23-13-2, Shutdown From Outside the Control Room, Rev 12.

Validation Time: 10 minutes Time Critical: N/A Completion Time: ________ minutes Comments:

Result: SAT UNSAT Examiner (Print / Sign): Date:

Page 1 of 7 SONGS Oct 2009 NRC JPM P-2 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 PLANT SETUP EXAMINER:

PROVIDE the examinee with a copy of:

  • SO23-13-2, Shutdown From Outside the Control Room.
  • Attachment 10, Radwaste Operator Duties for Unit 2.
  • Attachment 11, Primary Auxiliary Operator Duties for Unit 3.
  • MARK UP BAMU Tank levels showing a trend towards 25% for 2(3)TK-072 and 22% for 2(3)TK-071 when the next reading is obtained.

Page 2 of 7 SONGS Oct 2009 NRC JPM P-2 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1

- Check Mark Denotes Critical Step START TIME:

Examiner Cue: Remind the examinee to simulate all actions.

Examiner Cue: Boric Acid Makeup (BAMU) Tank levels were last taken 15 minutes ago.

Perform Step: 1 Determine BAMU tank levels every 15 minutes.

Standard: DETERMINE that no flow exists past the BAMU Pump suction pressure gauges since Initial Conditions specify gravity feed in progress.

Examiner Cue: BAMU Pumps, P-174 and P-175 are not running.

Comment: SAT UNSAT Perform Step: 2 Determine BAMU tank levels every 15 minutes.

Standard: OBSERVE 2(3)PI-9273, Boric Acid Makeup Pump 2(3)P175 Inlet Pressure gauge.

Examiner Cue: PI-9273 indicates 9.2 psi.

Comment: SAT UNSAT Perform Step: 3 Determine BAMU tank levels every 15 minutes.

Standard: REFER to FIGURE LVL-BAMU and DETERMINE 2(3)T-072, BAMU Tank to be 25% with 9.2 psi suction pressure on 2(3)PI-9273.

Comment: SAT UNSAT Perform Step: 4 Determine BAMU tank levels every 15 minutes.

Standard: OBSERVE 2(3)PI-9279, Boric Acid Makeup Pump 2(3)P174 Inlet Pressure gauge.

Examiner Cue: PI-9279 indicates 9.0 psi.

Comment: SAT UNSAT Perform Step: 5 Determine BAMU tank levels every 15 minutes.

Standard: REFER to FIGURE LVL-BAMU and DETERMINE 2(3)T-071, BAMU Tank to be 22% with 9.0 psi suction pressure on 2(3)PI-9279.

Comment: SAT UNSAT Page 3 of 7 SONGS Oct 2009 NRC JPM P-2 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 6 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:

Standard: DETERMINE that BAMU Tank, 2(3)T-071, is approaching 21.8%.

Comment: SAT UNSAT Perform Step: 7 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:

  • LOCALLY OPEN LV-0227C, RWST to Charging Pumps Gravity Feed Valve.

Standard: ROTATE 2(3)LV-0227C, RWST to Charging Pump Suction Isolation Valve manual handwheel in the COUNTERCLOCKWISE direction and DEPRESS manual clutch lever while turning to engage the handwheel.

Comment: SAT UNSAT Perform Step: 8 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:

  • LOCALLY OPEN LV-0227C, RWST to Charging Pumps Gravity Feed Valve.

Standard: OBSERVE 2(3)LV-0227C, RWST to Charging Pump Suction Isolation Valve outward stem motion and RELEASE manual clutch lever when motion is observed.

Examiner Cue: LV-0227C, RWST to Charging Pumps Gravity Feed Valve is moving in the open direction.

Comment: SAT UNSAT Perform Step: 9 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:

  • LOCALLY OPEN LV-0227C, RWST to Charging Pumps Gravity Feed Valve.

Standard: ROTATE 2(3)LV-0227C, RWST to Charging Pump Suction Isolation Valve manual handwheel in the COUNTERCLOCKWISE direction until local position indication is 100%.

Examiner Cue: LV-0227C, RWST to Charging Pumps Gravity Feed Valve is full open.

Comment: SAT UNSAT Page 4 of 7 SONGS Oct 2009 NRC JPM P-2 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 10 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:

Standard: ROTATE 2(3)HV-9235, Boric Acid Makeup Tank 2(3)T072 Gravity Feed to Charging Pump Suction ISO Valve manual handwheel in the CLOCKWISE direction and DEPRESS manual clutch lever while turning to engage the handwheel.

Comment: SAT UNSAT Perform Step: 11 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:

Standard: OBSERVE 2(3)HV-9235, Boric Acid Makeup Tank 2(3)T072 Gravity Feed to Charging Pump Suction ISO Valve for inward stem motion and RELEASE the manual clutch lever when motion is observed.

Examiner Cue: HV-9235, BAMU Tank T-072 Gravity Feed Valve is moving in the close direction.

Comment: SAT UNSAT Perform Step: 12 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:

Standard: ROTATE 2(3)HV-9235, Boric Acid Makeup Tank 2(3)T072 Gravity Feed to Charging Pump Suction ISO Valve manual handwheel in the CLOCKWISE direction until local position indication is 0%.

Examiner Cue: HV-9235, BAMU Tank T-072 Gravity Feed Valve is closed.

Comment: SAT UNSAT Perform Step: 13 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:

Standard: ROTATE 2(3)HV-9240, Boric Acid Makeup Tank 2(3)T071 Gravity Feed to Charging Pump Suction ISO Valve manual handwheel in the CLOCKWISE direction and DEPRESS manual clutch lever while turning to engage the handwheel.

Comment: SAT UNSAT Page 5 of 7 SONGS Oct 2009 NRC JPM P-2 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 14 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:

Standard: OBSERVE 2(3)HV-9240, Boric Acid Makeup Tank 2(3)T071 Gravity Feed to Charging Pump Suction ISO Valve for inward stem motion and RELEASE manual clutch lever when motion is observed.

Examiner Cue: HV-9240, BAMU Tank T-071 Gravity Feed Valve is moving in the close direction.

Comment: SAT UNSAT Perform Step: 15 WHEN the first BAMU Tank approaches 21.8% level, as seen on Figure LVL-BAMU, THEN perform the following:

Standard: ROTATE 2(3)HV-9240, Boric Acid Makeup Tank 2(3)T071 Gravity Feed to Charging Pump Suction ISO Valve manual handwheel in the CLOCKWISE direction until local position indication is 0%.

Examiner Cue: BAMU Tank T-071 Gravity Feed Valve is closed.

Perform Step: 16 Notify the Unit 2 CRS of transfer to RWST Standard: REPORT to the Unit 2 (Unit 3) Control Room Supervisor that Charging Pump suctions are aligned to the Refueling Water Storage Tank.

Terminating Cue: The Control Room Supervisor acknowledges that Charging Pump suctions are aligned to the Refueling Water Storage Tank. This JPM is complete.

STOP TIME:

Page 6 of 7 SONGS Oct 2009 NRC JPM P-2 Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:

  • The Control Room has been evacuated per SO23-13-2, Shutdown From Outside the Control Room and a cooldown to Cold Shutdown is in progress.
  • The Boric Acid Makeup (BAMU) Tanks are aligned for gravity feed on Unit 2 (Unit 3).

INITIATING CUE: The Control Room Supervisor directs you to MONITOR BAMU Tank levels and when required, SHIFT Charging Pump suction to the Refueling Water Storage Tank per SO23-13-2, Shutdown From Outside the Control Room:

  • Attachment 10, Radwaste Operator Duties for Unit 2.
  • Attachment 11, Auxiliary Primary Operator Duties for Unit 3.

Page 7 of 7 SONGS Oct 2009 NRC JPM P-2 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC P-3 Task #190621 K/A #012 A2.06 4.4/4.7 SF-7

Title:

Radiation Control Area Entry and Locally Open the Reactor Trip Breakers Examinee (Print):

Testing Method:

Simulated Performance: X Classroom:

Actual Performance: Simulator:

Plant: X READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.

When you complete the task successfully, the objective for this JPM will be satisfied.

Initial Conditions: Given the following conditions:

  • Extra assistance is required in the Radiation Control Area at the Radwaste Control Room.

Initiating Cue: The Control Room Supervisor DIRECTS you to:

  • LOG onto an appropriate Radiation Exposure Permit and PROCEED to the Radwaste Control Room.

Task Standard: Locate and correctly perform Critical Steps of SO123-VII-20 and SO23-12-1.

Required Materials: SO123-VII-20, Health Physics Program, Rev. 13.

SO23-12-1, Standard Post Trip Actions, Rev. 21.

Validation Time: 5 minutes Time Critical: 8 minutes Completion Time: ________ minutes Comments:

Result: SAT UNSAT Examiner (Print / Sign): Date:

Page 1 of 10 SONGS Oct 2009 NRC JPM P-3 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 PLANT SETUP EXAMINER:

PROVIDE the examinee with a copy of:

  • No procedural guidance is provided for this task.

EXAMINER NOTE:

This JPM can be performed on either Unit. CIRCLE the Unit on which the JPM is to be performed on the JPM Worksheet and the JPM Cue Sheet.

  • This JPM includes an evaluation of entry into the RCA. The examinee will perform the RCA entry and then be cued that local tripping of the Reactor Trip Breakers is required. The JPM is then temporarily suspended after tripping the Reactor Trip Breakers while the second RCA JPM is completed (P-2). Once JPM P-2 is finished, the Examiner will return to JPM P-3 and complete the RCA exit portion of this JPM.
  • The TIME CRITICAL portion of the JPM starts when the 2nd Cue Sheet has been read and understood by the examinee.

Page 2 of 10 SONGS Oct 2009 NRC JPM P-3 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1

- Check Mark Denotes Critical Step START TIME:

Perform Step: 1 Obtain a Thermo Luminescent Device (TLD).

Standard: RETRIEVE Thermo Luminescent Detector (TLD) from the storage rack.

Comment: SAT UNSAT Perform Step: 2 Touch the login screen and scan ID badge and TLD.

Standard: TOUCH the login screen and SCAN ID badge and TLD.

Comment: SAT UNSAT Perform Step: 3 Sign-in on an appropriate Radiation Exposure Permit.

Standard: DETERMINE an appropriate Operations Routine Radiation Exposure Permit (REP) to provide assistance in a Low Hazard Radiological Controlled Area (LHRCA) and SCAN the REP.

Comment: SAT UNSAT Perform Step: 4 Log-in through the Routine RCA entry process.

  • Obtain a Portable Electronic Dosimeter (PED).

Standard: SELECT a Portable Electronic Dosimeter (PED) from the storage rack at the RCA entry.

Comment: SAT UNSAT Perform Step: 5 Log-in through the Routine RCA entry process.

  • Set the PED onto the pad at the log-in station.

Standard: SET the PED onto the pad at the log-in station.

Comment: SAT UNSAT Perform Step: 6 Log-in through the Routine RCA entry process.

  • Remove the PED and collect the printout.

Standard: When prompted, REMOVE the PED and COLLECT the printout.

Comment: SAT UNSAT Page 3 of 10 SONGS Oct 2009 NRC JPM P-3 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 7 Log-in through the Routine RCA entry process.

  • Review printout for allowable dose, dose rate, and accessible areas.

Standard: REVIEW printout for allowable dose, dose rate, and accessible areas.

Examiner Cue:

Comment: SAT UNSAT Perform Step: 8 Transition to the HP Checkpoint to access the RCA Standard: TRANSITION to the HP Checkpoint to access the RCA.

Examiner Cue: Proceed to the Radwaste Control Room.

Comment: SAT UNSAT Examiner Cue: Remind the examinee to simulate all actions.

Examiner Note: The required actions are performed without reference to a procedure and can be performed in any order.

Examiner Cue: Hand examinee the 2nd Cue Sheet and read it to them as follows:

The Unit 2 (Unit 3) Reactor has received a trip signal and the Reactor Trip Breakers failed to open.

The Control Room Supervisor DIRECTS you to PROCEED to the Reactor Trip Breaker Switchgear and locally OPEN Reactor Trip Circuit Breakers 1 through 8.

Examiner Note: The TCBs can be opened in pairs using the Emergency Trip pushbuttons or individually using the Manual Trip pushbutton on each breaker. The first sequence of Steps (9-12) addresses use of the Emergency Trip pushbuttons. The second sequence of Steps (13-20) uses the individual Manual Trip pushbuttons.

Examiner Note: This portion of the JPM is TIME CRITICAL.

CRITICAL START TIME:

Page 4 of 10 SONGS Oct 2009 NRC JPM P-3 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 9 Open Reactor Trip Circuit Breakers TCB-1 and TCB-5.

Standard: DEPRESS Emergency Trip pushbutton TCB-5 and TCB-1 (on TCB-5 cubicle) and OBSERVE green TRIPPED lights illuminate and mechanical indicators rotate to OPEN on TCB-1 and TCB-5.

Examiner Cue: TCB-5 and TCB-1 green tripped lights are illuminated and mechanical indicators read open.

Comment: SAT UNSAT Perform Step: 10 Open Reactor Trip Circuit Breakers TCB-2 and TCB-6.

Standard: DEPRESS Emergency Trip pushbutton TCB-6 and TCB-2 (on TCB-6 cubicle) and OBSERVE green TRIPPED lights illuminate and mechanical indicators rotate to OPEN on TCB-2 and 6 cubicles.

Examiner Cue: TCB-6 and TCB-2 green tripped lights are illuminated and mechanical indicators read open.

Comment: SAT UNSAT Perform Step: 11 Open Reactor Trip Circuit Breakers TCB-3 and TCB-7.

Standard: DEPRESS Emergency Trip pushbutton TCB-3 and TCB-7 (on TCB-3 cubicle) and OBSERVE green TRIPPED lights illuminate and mechanical indicators rotate to OPEN on TCB-3 and 7 cubicles.

Examiner Cue: TCB-3 and TCB-7 green tripped lights are illuminated and mechanical indicators read open.

Comment: SAT UNSAT Perform Step: 12 Open Reactor Trip Circuit Breakers TCB-4 and TCB-8.

Standard: DEPRESS Emergency Trip push button TCB-4 and TCB-8 (on TCB-4 cubicle) and OBSERVE green TRIPPED lights illuminate and mechanical indicators rotate to OPEN on TCB-4 and 8 cubicles.

Examiner Cue: TCB-4 and TCB-8 green tripped lights are illuminated and mechanical indicators read open.

Examiner Note: This ends the TIME CRITICAL clock if Sequence #1 was used.

Comment: SAT UNSAT CRITICAL STOP TIME:

Page 5 of 10 SONGS Oct 2009 NRC JPM P-3 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 CRITICAL START TIME:

Examiner Note: This portion of the JPM is TIME CRITICAL.

Examiner Note: Sequence #2 using the individual trip pushbutton on each breaker.

Perform Step: 13 Open Reactor Trip Circuit Breaker TCB-1.

Standard: PULL DOWN Plexiglas guard plate and DEPRESS TCB-1 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and mechanical indicator rotates to OPEN on TCB-1.

Examiner Cue: TCB-1 green tripped light is illuminated and mechanical indicator reads OPEN.

Comment: SAT UNSAT Perform Step: 14 Open Reactor Trip Circuit Breaker TCB-2.

Standard: PULL DOWN Plexiglas guard plate and DEPRESS TCB-2 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and mechanical indicator rotates to OPEN on TCB-2.

Examiner Cue: TCB-2 green tripped light is illuminated and mechanical indicator reads OPEN.

Comment: SAT UNSAT Perform Step: 15 Open Reactor Trip Circuit Breaker TCB-3.

Standard: PULL DOWN Plexiglas guard plate and DEPRESS TCB-3 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and mechanical indicator rotates to OPEN on TCB-3.

Examiner Cue: TCB-3 green tripped light is illuminated and mechanical indicator reads OPEN.

Comment: SAT UNSAT Perform Step: 16 Open Reactor Trip Circuit Breaker TCB-4.

Standard: PULL DOWN Plexiglas guard plate and DEPRESS TCB-4 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and mechanical indicator rotates to OPEN on TCB-4.

Examiner Cue: TCB-4 green tripped light is illuminated and mechanical indicator reads OPEN.

Comment: SAT UNSAT Page 6 of 10 SONGS Oct 2009 NRC JPM P-3 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 17 Open Reactor Trip Circuit Breaker TCB-5.

Standard: PULL DOWN Plexiglas guard plate and DEPRESS TCB-5 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and mechanical indicator rotates to OPEN on TCB-5.

Examiner Cue: TCB-5 green tripped light is illuminated and mechanical indicator reads OPEN.

Comment: SAT UNSAT Perform Step: 18 Open Reactor Trip Circuit Breaker TCB-6.

Standard: PULL DOWN Plexiglas guard plate and DEPRESS TCB-6 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and mechanical indicator rotates to OPEN on TCB-6.

Examiner Cue: TCB-6 green tripped light is illuminated and mechanical indicator reads OPEN.

Comment: SAT UNSAT Perform Step: 19 Open Reactor Trip Circuit Breaker TCB-7.

Standard: PULL DOWN Plexiglas guard plate and DEPRESS TCB-7 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and mechanical indicator rotates to OPEN on TCB-7.

Examiner Cue: TCB-7 green tripped light is illuminated and mechanical indicator reads OPEN.

Comment: SAT UNSAT Perform Step: 20 Open Reactor Trip Circuit Breaker TCB-8.

Standard: PULL DOWN Plexiglas guard plate and DEPRESS TCB-8 PUSH TO OPEN pushbutton and OBSERVE green TRIPPED light illuminated and mechanical indicator rotates to OPEN on TCB-8.

Examiner Cue: TCB-8 green tripped light is illuminated and mechanical indicator reads OPEN.

Examiner Note: This ends the TIME CRITICAL clock if Sequence #2 was used.

Comment: SAT UNSAT CRITICAL STOP TIME:

Page 7 of 10 SONGS Oct 2009 NRC JPM P-3 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 21 Exit the RCA:

  • Set the PED onto the pad at the exit station.

Standard: SET the PED onto the pad at the exit station.

Comment: SAT UNSAT Perform Step: 22 Exit the RCA:

  • Scan ID badge and TLD at the exit station.

Standard: SCAN ID badge and TLD at the exit station.

Comment: SAT UNSAT Perform Step: 23 Exit the RCA:

  • Review dose information and remove PED from the exit station pad.

Standard: REVIEW dose information and REMOVE PED from the exit station pad.

Terminating Cue: This JPM is complete.

Comment: SAT UNSAT STOP TIME:

Page 8 of 10 SONGS Oct 2009 NRC JPM P-3 Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 CUE SHEET #1 INITIAL CONDITIONS: Given the following conditions:

  • Extra assistance is required in the Radiation Control Area at the Radwaste Control Room.

INITIATING CUE: The Control Room Supervisor DIRECTS you to:

  • LOG onto an appropriate Radiation Exposure Permit and PROCEED to the Radwaste Control Panel.

Page 9 of 10 SONGS Oct 2009 NRC JPM P-3 Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 CUE SHEET #2 INITIAL CONDITIONS: The Unit 2 (Unit 3) Reactor has received a trip signal and the Reactor Trip Breakers failed to open.

INITIATING CUE: The Control Room Supervisor DIRECTS you to:

THIS IS A TIME CRITICAL JPM Page 10 of 10 SONGS Oct 2009 NRC JPM P-3 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC S-1 Task #187757 K/A #001.A2.11 4.4 / 4.7 SF-1

Title:

Immediate Actions for Control Room Evacuation Examinee (Print):

Testing Method:

Simulated Performance: Classroom:

Actual Performance: X Simulator: X Plant:

READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.

When you complete the task successfully, the objective for this JPM will be satisfied.

Initial Conditions: The following conditions exist in Units 2 and 3:

  • A spill of a liquid has occurred resulting in toxic fumes in both Control Rooms.
  • The Shift Manager has directed that both Control Rooms be evacuated.

Initiating Cue: The Control Room Supervisor directs you to PERFORM the Unit 2 Immediate Actions for evacuating the Control Room per SO23-13-2, Shutdown from Outside the Control Room.

Task Standard: Locate and correctly perform Critical Steps of SO23-13-2.

Required Materials: SO23-13-2, Shutdown from Outside the Control Room, Rev. 11.

Validation Time: 4 minutes Time Critical: N/A Completion Time: ________ minutes Comments:

Result: SAT UNSAT Examiner (Print / Sign): Date:

Page 1 of 6 SONGS Oct 2009 NRC JPM S-1 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 SIMULATOR SETUP MACHINE OPERATOR:

INITIALIZE to IC#231 or any MODE 1 Initial Condition and PERFORM the following:

EXAMINER:

When immediate actions are complete, PROVIDE the examinee with a copy of:

  • SO23-13-2 Shutdown from Outside the Control Room.

Page 2 of 6 SONGS Oct 2009 NRC JPM S-1 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1

- Check Mark Denotes Critical Step START TIME:

Perform Step: 1 MANUALLY Trip the Reactor from either set of Manual Trip Pushbuttons.

Standard: DEPRESS 2HS-9132-1, Reactor Trip 1 and 2HS-9132-4, Reactor Trip 4 red pushbuttons (CR-52) or DEPRESS 2HS-9132-2, Reactor Trip 2 and 2HS-9132-3, Reactor Trip 3 red pushbuttons (CR-56).

Comment: SAT UNSAT Perform Step: 2 VERIFY all CEAs fully inserted and Neutron Power lowering.

Standard: VERIFY all CEAs fully inserted by OBSERVING rod bottom lights illuminated on 2ZI-9131, CEA Bottom Indication (Core Mimic) and/or OBSERVING CEAs fully inserted on 2ZI-9133, Secondary Rod Position (CEAC Display CRT).

Comment: SAT UNSAT Perform Step: 3 VERIFY all CEAs fully inserted and Neutron Power lowering.

Standard: VERIFY Neutron Power lowering by OBSERVING any of the following:

  • 2JI-0006B1 SU Channel 1 Percent Power indication LOWERING
  • 2JI-0005B2 SU Channel 2 Percent Power indication LOWERING
  • 2JI-9153-2 Startup Rate Channel 2 NEGATIVE Comment: SAT UNSAT Perform Step: 4 MANUALLY Initiate MSIS from either set of Manual Initiation Pushbuttons.

Standard: DEPRESS 2HS-9137-1 and 9137-2, MSIS Manual Initiation pushbuttons (CR-56) or DEPRESS 2HS-9137-3 and 9137-4, MSIS Manual Initiation pushbuttons (CR-53) and OBSERVE Annunciators 57A4(B4) - MSIS TRAIN A(B) ACTUATION.

Comment: SAT UNSAT Page 3 of 6 SONGS Oct 2009 NRC JPM S-1 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Examiner Note: Charging Pumps may be stopped in any order.

Perform Step: 5a STOP all Charging Pumps and REMOVE FROM AUTO.

Standard: DEPRESS 2P190, Charging Pump STOP pushbutton and OBSERVE green STOP light illuminated and white AUTO light extinguished.

Comment: SAT UNSAT Perform Step: 5b STOP all Charging Pumps and REMOVE FROM AUTO.

Standard: DEPRESS 2P191, Charging Pump STOP pushbutton and OBSERVE green STOP light illuminated and white AUTO light extinguished.

Comment: SAT UNSAT Perform Step: 5c STOP all Charging Pumps and REMOVE FROM AUTO.

Standard: DEPRESS 2P192, Charging Pump STOP pushbutton and OBSERVE green STOP light illuminated and white AUTO light extinguished.

Comment: SAT UNSAT Examiner Note: Reactor Coolant Pumps may be stopped in any order.

Perform Step: 6 STOP all RCPs from Control Handswitches OR by selecting the 6.9 kV Buses to MANUAL and Opening all Feeder Breakers.

  • RCP P-001 Standard: DEPRESS 2HS-9160A, RCP 2P001 STOP pushbutton and OBSERVE green STOP light illuminated and ammeter at zero (0) amps.

Comment: SAT UNSAT Perform Step: 7 STOP all RCPs from Control Handswitches OR by selecting the 6.9 kV Buses to MANUAL and Opening all Feeder Breakers.

  • RCP P-003 Standard: DEPRESS 2HS-9161A, RCP 2P003 STOP pushbutton and OBSERVE green STOP light illuminated and ammeter at zero (0) amps.

Comment: SAT UNSAT Page 4 of 6 SONGS Oct 2009 NRC JPM S-1 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Examiner Note: The following steps represent the alternate path for this JPM.

Perform Step: 8 STOP all RCPs from Control Handswitches OR by selecting the 6.9 kV Buses to MANUAL and Opening all Feeder Breakers.

  • RCP P-004 Standard: DEPRESS 2HS-9162A, RCP 2P004 STOP pushbutton and OBSERVE green STOP light illuminated and ammeter at zero (0) amps.

Comment: SAT UNSAT Perform Step: 9 STOP all RCPs from Control Handswitches OR by selecting the 6.9 kV Buses to MANUAL and Opening all Feeder Breakers.

  • RCP P-002 Standard: DEPRESS 2HS-9163A, RCP 2P002 STOP pushbutton and OBSERVE red START light illuminated and DETERMINE 2P002 will NOT trip.

Comment: SAT UNSAT Perform Step: 10 STOP all RCPs from Control Handswitches OR by selecting the 6.9 kV Buses to MANUAL and Opening all Feeder Breakers.

  • RCP P-002 Standard: DEPRESS 2HS-1610B, RES AUX XFMR 2XR3 FDR BKR 2A0202 MODE SELECTOR MANUAL pushbutton and OBSERVE blue MANUAL light illuminated.

Comment: SAT UNSAT Perform Step: 11 STOP all RCPs from Control Handswitches OR by selecting the 6.9 kV Buses to MANUAL and Opening all Feeder Breakers.

  • RCP P-002 Standard: DEPRESS 2HS-1610, RES AUX XFMR 2XR3 FDR BKR 2A0202 TRIP pushbutton and OBSERVE green TRIP light illuminated.

Terminating Cue: This JPM is complete.

Comment: SAT UNSAT STOP TIME:

Page 5 of 6 SONGS Oct 2009 NRC JPM S-1 Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: The following conditions exist in Units 2 and 3:

  • A spill of a liquid has occurred resulting in toxic fumes in both Control Rooms.
  • The Shift Manager has directed that both Control Rooms be evacuated.

INITIATING CUE: The Control Room Supervisor directs you to PERFORM the Unit 2 Immediate Actions for evacuating the Control Room per SO23-13-2, Shutdown from Outside the Control Room.

Page 6 of 6 SONGS Oct 2009 NRC JPM S-1 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC S-2 Task #141241 K/A #004.A4.06 3.6 / 3.1 SF-2

Title:

Secure Charging and Letdown Examinee (Print):

Testing Method:

Simulated Performance: Classroom:

Actual Performance: X Simulator: X Plant:

READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.

When you complete the task successfully, the objective for this JPM will be satisfied.

Initial Conditions: The following conditions exist on Unit 2:

  • Power is stable at 100%.
  • A walkdown outside the Containment has not identified a leak source.
  • The leakage source is suspected to be the Charging Pump.
  • Management has given permission to secure Charging and Letdown to perform an RCS Inventory Balance.

Initiating Cue: The Control Room Supervisor directs you to SECURE Charging and Letdown per SO23-3-2.1.2, CVCS Outage Evolutions, Section 6.2, Securing Charging and Letdown.

Task Standard: Locate and correctly perform Critical Steps of SO23-3-2.1.2.

Required Materials: SO23-3-2.1.2, CVCS Outage Evolutions, Rev 4.

Validation Time: 10 minutes Time Critical: N/A Completion Time: ________ minutes Comments:

Result: SAT UNSAT Examiner (Print / Sign): Date:

Page 1 of 6 SONGS Oct 2009 NRC JPM S-2 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 SIMULATOR SETUP MACHINE OPERATOR:

INITIALIZE to IC#232 or any 100% power Initial Condition and PERFORM the following:

  • ENSURE Pressurizer level is normal for 100% power.
  • ENSURE 2PIC-0201A, Back Pressure Control is in service.
  • ENSURE 2P-191, Charging Pump is the operating pump.

PERFORM the following after each JPM:

  • RESET the Simulator to ENSURE proper operation of 2TV-0224B, CVCS IX Bypass Valve.

EXAMINER:

PROVIDE the examinee with a copy of:

  • SO23-3-2.1.2, CVCS Outage Evolutions.
  • INITIAL Sections 6.1 and 6.3 N/A and remove all Attachments.

Page 2 of 6 SONGS Oct 2009 NRC JPM S-2 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1

- Check Mark Denotes Critical Step START TIME:

Perform Step: 1 If at power, then ADJUST Pressurizer Level to 41%-54%.

Standard: DETERMINE that Pressurizer level is within the band of 41%-54% by OBSERVING 2LI-0110A1 and 2LI-0110A2, Hot Calibrated Pressurizer Level instruments.

Comment: SAT UNSAT Perform Step: 2 SELECT TV-0224B, CVCS IX Bypass, to MANUAL, then PLACE in BYPASS.

Standard: DEPRESS 2TV-0224B, Ion Exchangers Bypass Valve MANUAL pushbutton and OBSERVE blue MANUAL and red BYPASS lights illuminated with green ION EXCH and white AUTO lights extinguished.

Comment: SAT UNSAT Perform Step: 3 CLOSE TV-0224A, Boronometer Isolation.

Standard: DEPRESS 2TV-0224A, Boronometer Iso Valve CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished.

Comment: SAT UNSAT Perform Step: 4 PLACE the in-service HIC-0110A and/or HIC-0110B Letdown Flow Controller to MANUAL and LOWER output to zero (valves full closed).

Standard: DEPRESS 2HIC-0110A, Flow Control Auto-Manual Selector Switch A/M pushbutton ONCE and OBSERVE M light illuminated.

Comment: SAT UNSAT Perform Step: 5 PLACE the in-service HIC-0110A and/or HIC-0110B Letdown Flow Controller to MANUAL and LOWER output to zero (valves full closed).

Standard: DEPRESS 2HIC-0110A, Flow Control SEL pushbutton until OUT is displayed.

Comment: SAT UNSAT Page 3 of 6 SONGS Oct 2009 NRC JPM S-2 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 6 PLACE the in-service HIC-0110A and/or HIC-0110B Letdown Flow Controller to MANUAL and LOWER output to zero (valves full closed).

Standard: DEPRESS 2HIC-0110A, Flow Control LOWER pushbutton () until OUTPUT is zero (0).

Comment: SAT UNSAT Examiner Note Only one of the following four sub-steps is considered critical. One Letdown Isolation Valve closed satisfies the required action.

Perform Step: 7a CLOSE the following Letdown valves:

  • TV-0221, Letdown Temperature Isolation.

Standard: DEPRESS 2TV-0221, Regen HX Inlet ISO Valve CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished.

Comment: SAT UNSAT Perform Step: 7b CLOSE the following Letdown valves:

  • HV-9204, Letdown to Regen Heat Exchanger Isolation.

Standard: DEPRESS 2HV-9204, Regen HX Inlet ISO Valve CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished.

Comment: SAT UNSAT Perform Step: 7c CLOSE the following Letdown valves:

  • TV-9267, Letdown Heat Exchanger Outlet.

Standard: DEPRESS 2TV-9267, Regen HX Outlet ISO Valve CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished.

Comment: SAT UNSAT Page 4 of 6 SONGS Oct 2009 NRC JPM S-2 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 7d CLOSE the following Letdown valves:

  • HV-9205, Letdown Containment Isolation.

Standard: DEPRESS 2HV-9205, Regen HX Outlet ISO Valve CLOSE pushbutton and OBSERVE green CLOSE light illuminated and red OPEN light extinguished.

Comment: SAT UNSAT Perform Step: 8a PLACE backup Charging Pump(s) to STOP.

Standard: DEPRESS 2P-190, Charging Pump STOP pushbutton and OBSERVE green STOP light illuminated and white AUTO light extinguished.

Comment: SAT UNSAT Perform Step: 8b PLACE backup Charging Pump(s) to STOP.

Standard: DEPRESS 2P-192, Charging Pump STOP pushbutton and OBSERVE green STOP light illuminated and white AUTO light extinguished.

Comment: SAT UNSAT Perform Step: 8c STOP operating Charging Pump(s).

Standard: DEPRESS 2P-191, Charging Pump STOP pushbutton and OBSERVE green STOP light illuminated and white AUTO light extinguished.

Comment: SAT UNSAT Perform Step: 9 LOWER PIC-0201A or B Setpoint for the in-service Letdown Backpressure Controller to < 165 psig.

Standard: DEPRESS 2PIC-0201B, Backpressure Control SEL pushbutton until OSP is observed then DEPRESS LOWER pushbutton () until setpoint is less than 165 psig as read on 2PIC-0201B.

Terminating Cue: This JPM is complete.

Comment: SAT UNSAT STOP TIME:

Page 5 of 6 SONGS Oct 2009 NRC JPM S-2 Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: The following conditions exist on Unit 2:

  • Power is stable at 100%.
  • A walkdown outside the Containment has not identified a leak source.
  • The leakage source is suspected to be the Charging Pump.
  • Management has given permission to secure Charging and Letdown to perform an RCS Inventory Balance.

INITIATING CUE: The Control Room Supervisor directs you to SECURE Charging and Letdown per SO23-3-2.1.2, CVCS Outage Evolutions, Section 6.2, Securing Charging and Letdown.

Page 6 of 6 SONGS Oct 2009 NRC JPM S-2 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC S-3 Task #192218 K/A #006.A4.07 4.4 / 4.4 SF-3

Title:

Simultaneous Hot Leg and Cold Leg Injection Examinee (Print):

Testing Method:

Simulated Performance: Classroom:

Actual Performance: X Simulator: X Plant:

READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.

When you complete the task successfully, the objective for this JPM will be satisfied.

Initial Conditions: Given the following conditions on Unit 2:

  • The plant has experienced a Loss of Coolant Accident.
  • Over two hours have elapsed since Safety Injection Actuation Signal (SIAS) initiation.

Initiating Cue: The Control Room Supervisor directs you to PERFORM SO23-12-11, EOI Supporting Attachments, Attachment 11, Simultaneous Hot/Cold Leg Injection.

Task Standard: Locate and correctly perform Critical Steps of SO23-12-11, EOI Supporting Attachments, Attachment 11.

Required Materials: SO23-12-11, EOI Supporting Attachments, Rev 6.

Validation Time: 20 minutes Time Critical: N/A Completion Time: ________ minutes Comments:

Result: SAT UNSAT Examiner (Print / Sign): Date:

Page 1 of 9 SONGS Oct 2009 NRC JPM S-3 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 SIMULATOR SETUP MACHINE OPERATOR:

INITIALIZE to IC#233 or any 100% power Initial Condition and PERFORM the following:

  • INSERT RC03, RCS Leak at 100%.
  • INSERT RC01A, RCS Rupture at 20% until RCS pressure is < 500 psia then LOWER to 0.015%.
  • INSERT malfunctions EC08C and EC08DA, HPSI Pump P-017 and P-018 (Train A) trips.
  • ENSURE only Train B HPSI is operating.
  • EXECUTE remote function EC79A, CLOSE 2HV-9434 breaker when directed.

EXAMINER:

PROVIDE the examinee with a copy of:

  • SO23-12-11, EOI Supporting Attachments, Attachment 11, Simultaneous Hot /

Cold Leg Injection.

Page 2 of 9 SONGS Oct 2009 NRC JPM S-3 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1

- Check Mark Denotes Critical Step START TIME:

Perform Step: 1 VERIFY Entry Conditions:

  • ENSURE time elapsed from SIAS actuation - greater than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Standard: VERIFY greater than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> from SIAS actuation per Initial Conditions.

Comment: SAT UNSAT Perform Step: 2 VERIFY Entry Conditions:

  • VERIFY FS-7, VERIFY SI Throttle/Stop Criteria - NOT satisfied Standard: DETERMINE SI Throttle/Stop Criteria not met due to Pressurizer level.

Comment: SAT UNSAT Perform Step: 3 ENSURE SDC Valves Closed:

  • ENSURE SDC To LPSI Pump Suction Isolation valves - closed:

HV-9337 Standard: OBSERVE 2HV-9337, SDC to LPSI Pumps Suction ISO Valve green CLOSE light illuminated.

Comment: SAT UNSAT Perform Step: 4 ENSURE SDC Valves Closed:

  • ENSURE SDC To LPSI Pump Suction Isolation valves - closed:

HV-9377 Standard: OBSERVE 2HV-9377, SDC to LPSI Pumps Suction ISO Valve green CLOSE light illuminated.

Comment: SAT UNSAT Perform Step: 5 ENSURE SDC Valves Closed:

  • ENSURE SDC To LPSI Pump Suction Isolation valves - closed:

HV-9339 Standard: OBSERVE 2HV-9339, SDC to LPSI Pumps Suction ISO Valve green CLOSE light illuminated.

Comment: SAT UNSAT Page 3 of 9 SONGS Oct 2009 NRC JPM S-3 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 6 ENSURE SDC Valves Closed:

  • ENSURE SDC To LPSI Pump Suction Isolation valves - closed:

HV-9378 Standard: OBSERVE 2HV-9378, SDC to LPSI Pumps Suction ISO Valve green CLOSE light illuminated.

Comment: SAT UNSAT Perform Step: 7 VERIFY HPSI Operability:

  • VERIFY both trains of HPSI - operating Standard: DETERMINE only Train B of HPSI is operating and OBSERVE green STOP lights illuminated for the Train A HPSI Pumps 2P017 and 2P018.

Comment: SAT UNSAT Examiner Note: The following steps represent the alternate path for this JPM.

Perform Step: 8 VERIFY PZR pressure - greater than 500 PSIA (Low Range):

  • CFMS page 311 Standard: REFERENCE QSPDS page 611 and CFMS page 311 and OBSERVE Low Range Pressurizer pressure on both pages read less than 500 psig and ENTERS RNO column.

Comment: SAT UNSAT Perform Step: 9 ENSURE only one HPSI Pump - operating AND GO TO step 15.

Standard: OBSERVE 2HS-9394-2, HPSI Pump 2P019 red START light illuminated and ammeter reading ~ 55 amps and TRANSITION to Step 15.

Comment: SAT UNSAT Page 4 of 9 SONGS Oct 2009 NRC JPM S-3 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 10 RECORD the HPSI Cold Leg Flow Rates:

  • FI-0321: _______ GPM
  • FI-0331: _______ GPM
  • FI-0311: _______ GPM
  • FI-0341: _______ GPM SUM: _______ GPM (Total flow to cold legs)

Standard: OBSERVE HPSI Cold Leg flow instruments and RECORD values:

  • 230 gpm + 230 gpm + 180 gpm + 230 gpm = 840 gpm Comment: SAT UNSAT Perform Step: 11 HPSI train in service - identified:

Train A Train B Standard: IDENTIFY Train B HPSI as in-service.

Comment: SAT UNSAT Perform Step: 12 ENSURE key switches to associated RCS Hot Leg Isolation valves -

closed: Train B HV-9434 Standard: DETERMINE 2HV-9434, HPSI HDR 2 to Loop 1 Hot Leg ISO Valve keyswitch in CLOSE and green CLOSE light illuminated.

Comment: SAT UNSAT Perform Step: 13 ENSURE associated breaker - unlocked and closed: BZ-39 Standard: DIRECT the PEO to unlock and CLOSE breaker 2BZ-39.

M.O. Cue: EXECUTE remote function EC79A and REPORT breaker 2BZ-39 is closed.

Comment: SAT UNSAT Page 5 of 9 SONGS Oct 2009 NRC JPM S-3 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Examiner Note: Each of the following four sub-steps may be repeated as each header is throttled.

Perform Step: 14 ADJUST the following valves on the associated train to reduce the indicated flow rates to approximately one half of those recorded in step 15: Train B HV-9323 Standard: DEPRESS 2HV-9323, HDR 2 to Loop 1A OVERRIDE then JOG CLOSE pushbuttons until flow on 2FI-0321-1 is approximately 1/2 recorded value.

Comment: SAT UNSAT Perform Step: 15 ADJUST the following valves on the associated train to reduce the indicated flow rates to approximately one half of those recorded in step 15: Train B HV-9326 Standard: DEPRESS 2HV-9326, HDR 2 to Loop 1B OVERRIDE then JOG CLOSE pushbuttons until flow on 2FI-0331-1 is approximately 1/2 recorded value.

Comment: SAT UNSAT Perform Step: 16 ADJUST the following valves on the associated train to reduce the indicated flow rates to approximately one half of those recorded in step 15: Train B HV-9329 Standard: DEPRESS 2HV-9329, HDR 2 to Loop 2A OVERRIDE then JOG CLOSE pushbuttons until flow on 2FI-0311-2 is approximately 1/2 recorded value.

Comment: SAT UNSAT Perform Step: 17 ADJUST the following valves on the associated train to reduce the indicated flow rates to approximately one half of those recorded in step 15: Train B HV-9332 Standard: DEPRESS 2HV-9332, HDR 2 to Loop 2B OVERRIDE then JOG CLOSE pushbuttons until flow on 2FI-0341-2 is approximately 1/2 recorded value.

Comment: SAT UNSAT Perform Step: 18 ENSURE associated Hot Leg Injection valve - open: Train B HV-9434 Standard: PLACE 2HV-9434, HPSI HDR 2 to Loop 1 Hot Leg ISO Valve keyswitch in OPEN and OBSERVE red OPEN light illuminated and valve position indication at 100%.

Comment: SAT UNSAT Page 6 of 9 SONGS Oct 2009 NRC JPM S-3 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 19 ADJUST associated RCS Cold Leg Injection valves on the operating train to values obtained in step 16d: Train B HV-9323 Standard: DEPRESS 2HV-9323, HDR 2 to Loop 1A JOG OPEN pushbutton until flow on 2FI-0321-1 is approximately the value of JPM Step 14.

Comment: SAT UNSAT Perform Step: 20 ADJUST associated RCS Cold Leg Injection valves on the operating train to values obtained in step 16d: Train B HV-9326 Standard: DEPRESS 2HV-9326, HDR 2 to Loop 1B JOG OPEN pushbutton until flow on 2FI-0331-1 is approximately the value of JPM Step 15.

Comment: SAT UNSAT Perform Step: 21 ADJUST associated RCS Cold Leg Injection valves on the operating train to values obtained in step 16d: Train B HV-9329 Standard: DEPRESS 2HV-9329, HDR 2 to Loop 2A JOG OPEN pushbutton until flow on 2FI-0311-2 is approximately the value of JPM Step 16.

Comment: SAT UNSAT Perform Step: 22 ADJUST associated RCS Cold Leg Injection valves on the operating train to values obtained in step 16d: Train B HV-9332 Standard: DEPRESS 2HV-9332, HDR 2 to Loop 2B JOG OPEN pushbutton until flow on 2FI-0341-2 is approximately the value of JPM Step 17.

Comment: SAT UNSAT Page 7 of 9 SONGS Oct 2009 NRC JPM S-3 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 23 ESTABLISH the following conditions:

  • Indicated flow sum of: FI-0321, FI-0331, FI-0311, FI-0341 and FI-9435 - less than or equal to 910 GPM.

Standard: OBSERVE HPSI Hot & Cold Leg flow instruments, RECORD values, and DETERMINE flow is less than 910 gpm:

  • 105 gpm + 105 gpm + 105 gpm + 105 gpm + 440 gpm = 860 gpm Terminating Cue: This JPM is complete.

Comment: SAT UNSAT STOP TIME:

Page 8 of 9 SONGS Oct 2009 NRC JPM S-3 Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: Given the following conditions on Unit 2:

  • The plant has experienced a Loss of Coolant Accident.
  • Over two hours have elapsed since Safety Injection Actuation Signal (SIAS) initiation.

INITIATING CUE: The Control Room Supervisor directs you to PERFORM SO23-12-11, EOI Supporting Attachments, Attachment 11, Simultaneous Hot/ Cold Leg Injection.

Page 9 of 9 SONGS Oct 2009 NRC JPM S-3 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC S-4 Task #192368 K/A #003.A4.06 2.9 / 2.9 SF-4P

Title:

Start a Reactor Coolant Pump Examinee (Print):

Testing Method:

Simulated Performance: Classroom:

Actual Performance: X Simulator: X Plant:

READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.

When you complete the task successfully, the objective for this JPM will be satisfied.

Initial Conditions: Given the following conditions:

  • Unit 2 is in MODE 3.
  • A heat up is in progress to the point of starting the 4th Reactor Coolant Pump P-002.
  • All actions of SO23-3-1.7, Reactor Coolant Pump Operation, through Step 6.1.18 are complete.

Initiating Cue: The Control Room Supervisor directs you to START Reactor Coolant Pump P-002 using SO23-3-1.7, Reactor Coolant Pump Operation, starting at Step 6.1.19.

Task Standard: Locate and correctly perform Critical Steps of SO23-3-1.7.

Required Materials: SO23-3-1.7, Reactor Coolant Pump Operation, Rev. 35.

SO23-15-56.C, 56C40 - RCP P002 CCW FLOW LO, Rev. 17.

Validation Time: 15 minutes Time Critical: N/A Completion Time: ________ minutes Comments:

Result: SAT UNSAT Examiner (Print / Sign): Date:

Page 1 of 9 SONGS Oct 2009 NRC JPM S-4 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 SIMULATOR SETUP MACHINE OPERATOR:

INITIALIZE to IC#234 or any MODE 4 Initial Condition with RCS temperature > 400ºF and PERFORM the following:

  • DISPLAY PCS Trend Group Data page for RCP P002 as follows:
  • ACCESS MAIN MENU on PCS.
  • SELECT MAIN POINTS.
  • SELECT POINT 1.
  • Point Type Selected to SERVER GROUP.
  • SELECT RCP 2 PARMS then SELECT ADD.
  • INSERT Key #38, CPC A Trip Bypass and TURN to ON.
  • INSERT Key #42, CPC B Trip Bypass and TURN to ON.
  • INSERT Key #46, CPC C Trip Bypass and TURN to ON.
  • INSERT Key #50, CPC D Trip Bypass and TURN to ON.
  • INSERT malfunction CC02B for Annunciator 56C40 30 seconds minute after starting RCP P002.

EXAMINER:

PROVIDE the examinee with a copy of:

  • INITIAL through Step 6.1.18.

Page 2 of 9 SONGS Oct 2009 NRC JPM S-4 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1

- Check Mark Denotes Critical Step START TIME:

Examiner Note: Ensure the setup page information for Plant Computer System Trend Group Data is complete.

Perform Step: 1 START one Oil Lift Pump by selecting the NORMAL mode.

Standard: DEPRESS the NORMAL pushbutton on either 2HS-9117A, 2P002 Oil Lift Pump 2P262, or 2HS-9118A, 2P002 Oil Lift Pump 2P263 and OBSERVE amber NORMAL and red START lights illuminated.

Examiner Note: Annunciator alarm 56C39 will come in and reset. This is an expected alarm.

Comment: SAT UNSAT Perform Step: 2 ENSURE the second oil lift pump selected to STANDBY.

Standard: DEPRESS the STANDBY pushbutton on either 2HS-9117A, 2P002 Oil Lift Pump 2P262 or 2HS-9118A, 2P002 Oil Lift Pump 2P263, whichever was not started in the previous step and VERIFY amber STANDBY and green STOP lights illuminated.

Examiner Cue: Two minutes has elapsed.

Comment: SAT UNSAT Perform Step: 3 After the Oil Lift System has run approximately 2 minutes, then START the ARRD Lube Oil Pump by selecting the NORMAL mode.

Standard: DEPRESS the NORMAL pushbutton on either 2HS-9196, 2P002 ARRD Pump 2P401 or 2HS-9197, 2P002 ARRD Pump 2P402 and OBSERVE amber NORMAL and red START lights illuminated.

Comment: SAT UNSAT Perform Step: 4 ENSURE the second ARRD pump is available by selecting STANDBY mode.

Standard: DEPRESS the STANDBY pushbutton on either 2HS-9196, 2P002 ARRD Pump 2P401 or 2HS-9197, 2P002 ARRD Pump 2P402, whichever was not started in the previous step and VERIFY amber STANDBY and green STOP lights illuminated.

Comment: SAT UNSAT Page 3 of 9 SONGS Oct 2009 NRC JPM S-4 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 5 VERIFY the following alarms on Panel CR56 are reset prior to the start of the associated RCP:

  • RCP THRUST BEARINGS TEMP HI (56C03, 05, 07, and 09)
  • RCP REVERSE ROTATION (56C14, 16, 18, and 20)
  • RCP OIL LIFT FLOW LO (56C23, 25, 27, and 29)
  • RCP OIL LIFT PRESS LO (56C33, 35, 37, and 39)

Standard: OBSERVE alarms on Panel CR-56 are RESET prior to starting RCP:

  • 56C09 - RCP P002 THRUST BRG TEMP HI
  • 56C20 - RCP P002 REVERSE ROTATION
  • 56C29 - RCP P002 OIL LIFT FLOW LO
  • 56C39 - RCP P002 OIL LIFT PRESS LO
  • 56C49 - RCP P002 ARRD LUBE OIL FLOW LO Comment: SAT UNSAT Perform Step: 6 Verify PCS Points selected in Step 6.1.8 not in alarm.

Standard: OBSERVE RCP 2P-002 information on Plant Computer System.

Examiner Cue: There are no Plant Computer System points in alarm for the RCPs.

Comment: SAT UNSAT Perform Step: 7 Verify RCP CONTROLLED BLEED-OFF FLOW (PCS) is reset or proper RCP CBO flow for the existing RCS pressure.

Standard: VERIFY RCP Controlled Bleed-Off Flow on Plant Computer System is RESET (Point ID F-180) or proper RCP CBO flow for the existing RCS pressure (~1.5 gpm).

Comment: SAT UNSAT Page 4 of 9 SONGS Oct 2009 NRC JPM S-4 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 8 Verify CCW SEAL HEAT EXCHANGER TEMPERATURE HI (PCS) alarm is reset.

Standard: VERIFY CCW Seal Exchanger temperature high alarm on Plant Computer System is RESET (Point ID TE-9174).

Comment: SAT UNSAT Perform Step: 9 VERIFY the following final configuration:

  • One Oil Lift Pump selected to NORMAL
  • One Oil Lift Pump selected to Standby
  • One ARRD Pump selected to Normal
  • One ARRD Pump selected to Standby
  • Vibration Alarm reset Standard: PERFORM final configuration check:
  • VERIFY Oil Lift Pump, 2P262 or 2P263 amber NORMAL light illuminated.
  • VERIFY Oil Lift Pump, 2P262 or 2P263 amber STANDBY light illuminated.
  • VERIFY ARRD Pump, 2P401 or 2P402 amber NORMAL light illuminated.
  • VERIFY ARRD Pump, 2P401 or 2P402 amber STANDBY light illuminated.
  • VERIFY Vibration Alarm reset on 2HS-0181, 2P002 Vibration Monitor white RESET light extinguished.

Comment: SAT UNSAT Perform Step: 10 If Backfeeding Unit Aux Transformer (UAT) when in Modes 4 or 5, and a UAT high temperature alarm is received, then ENSURE only one RCP is running on the associated bus.

Standard: DETERMINE Backfeeding via the Unit Auxiliary Transformer is not being performed.

Examiner Cue: Backfeeding via the Unit Auxiliary Transformer is not being performed.

Comment: SAT UNSAT Page 5 of 9 SONGS Oct 2009 NRC JPM S-4 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 11 VERIFY RCP Zero Speed lamp illuminated.

Standard: OBSERVE 2SL-9116, Zero Speed Indication for RCP 2P002 white ZERO SPEED light illuminated.

Comment: SAT UNSAT Perform Step: 12 If another RCP is already running, then ENSURE it has been in service for at least 5 minutes.

Standard: DETERMINE that all three running RCPs have been in service for greater than 5 minutes.

Examiner Cue: All running RCPs have run for more than 5 minutes.

Comment: SAT UNSAT Perform Step: 13 If this RCP start is associated with an idle loop, then COMMENCE monitoring Nuclear Instrumentation and continue for approximately the first minute of pump operation.

Standard: DETERMINE that RCP 2P004 is running and the loop is not idle.

Comment: SAT UNSAT Perform Step: 14 ANNOUNCE pump start using local area page.

Standard: DIAL 429 on phone and ANNOUNCE Reactor Coolant Pump 2P002 start.

Comment: SAT UNSAT Page 6 of 9 SONGS Oct 2009 NRC JPM S-4 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Examiner Note: Annunciator 50A51 - VIBRATION AND LOOSE PARTS MONITOR SYSTEM TROUBLE will come in and reset. This is an expected alarm when starting the RCP.

Perform Step: 15 START the Reactor Coolant Pump and PERFORM the following:

  • Verify motor amps stabilize between 470 and 800 amps.

Standard: DEPRESS 2HS-9163A, 2P002 START pushbutton and OBSERVE:

  • Red START light illuminated and green STOP light extinguished.
  • VERIFY motor amps stabilize between 470 and 800 amps on ammeter.

Examiner Cue: If examinee attempts to research cause of alarm, state that another operator is at 2L-194 verifying alarm was due to starting the RCP.

Comment: SAT UNSAT Perform Step: 16 START the Reactor Coolant Pump and PERFORM the following:

  • Closely MONITOR RCS pressure.

Standard: OBSERVE RCS pressure is satisfactory using any combination of Control Board, CFMS, QSPDS or PCS indicators.

Comment: SAT UNSAT Perform Step: 17 Verify the Oil Lift and ARRD Pumps automatically stop and Zero Speed lamp extinguishes.

Standard: OBSERVE:

  • Oil Lift Pump indicators for 2P002 Oil Lift Pump 2P262 and 2P263, green STOP lights illuminated.
  • ARRD Pump Indicators for 2P002 ARRD Pump 2P401 and 2P402, green STOP lights illuminated.
  • 2SL-9116, 2P002 white ZERO SPEED light extinguished.

Comment: SAT UNSAT Perform Step: 18 Check RCP Oil Reservoir levels SAT.

Standard: DIRECT an Operator to REPORT RCP 2P002 Oil Reservoir levels.

Examiner Cue: Operator at the pump reports oil levels are satisfactory.

Comment: SAT UNSAT Page 7 of 9 SONGS Oct 2009 NRC JPM S-4 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Examiner Note: The following steps represent the alternate path for this JPM.

Perform Step: 19 Acknowledge annunciator 56C40 - RCP P002 CCW FLOW LO.

Standard: ACKNOWLEDGE annunciator 56C40 - RCP P002 CCW FLOW LO and REFER to 56C40 Annunciator Response Procedure.

Examiner Cue: If the examinee checks Plant Computer System trends for 2P002 CCW FLOW LO, REPORT that CCW flow is 400 gpm and lowering and temperature is as read.

Comment: SAT UNSAT Examiner Note: The following guidance is provided in Annunciator Response Procedure for 56C40, Step 1.2.

Perform Step: 20 If in Modes 3-5, then stop 2(3)MP-002, RCP.

Standard: RECOGNIZE operation in MODE 3 and DETERMINE RCP 2P002 must be stopped.

Comment: SAT UNSAT Perform Step: 21 Trip RCP P002.

Standard: DEPRESS 2HS-9163A, 2P002 STOP pushbutton and VERIFY green STOP light illuminated, red START light extinguished, and ammeter at zero (0) amps.

Terminating Cue: This JPM is complete.

Comment: SAT UNSAT STOP TIME:

Page 8 of 9 SONGS Oct 2009 NRC JPM S-4 Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:

  • Unit 2 is in MODE 3.
  • A heat up is in progress to the point of starting the 4th Reactor Coolant Pump P-002.
  • All actions of SO23-3-1.7, Reactor Coolant Pump Operation, through Step 6.1.18 are complete.

INITIATING CUE: The Control Room Supervisor directs you to START Reactor Coolant Pump P-002 using SO23-3-1.7, Reactor Coolant Pump Operation, starting at Step 6.1.19.

Page 9 of 9 SONGS Oct 2009 NRC JPM S-4 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC S-5 Task #192294 K/A #026.A2.08 3.2 / 3.7 SF-5

Title:

Terminate the Containment Spray System Examinee (Print):

Testing Method:

Simulated Performance: Classroom:

Actual Performance: X Simulator: X Plant:

READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.

When you complete the task successfully, the objective for this JPM will be satisfied.

Initial Conditions: Given the following conditions:

  • A Loss of Coolant Accident inside Containment has occurred.
  • SO23-12-11, EOI Supporting Attachments, Attachment 2, Floating Steps, is being performed 105 minutes after the accident.

Initiating Cue: The Control Room Supervisor directs you to PERFORM SO23-12-11, EOI Supporting Attachments, Floating Step 14, Terminate Containment Spray Operation.

Task Standard: Locate and correctly perform Critical Steps of SO23-12-11.

Required Materials: SO23-12-11, EOI Supporting Attachments, Rev. 6.

Validation Time: 7 minutes Time Critical: N/A Completion Time: ________ minutes Comments:

Result: SAT UNSAT Examiner (Print / Sign): Date:

Page 1 of 8 SONGS Oct 2009 NRC JPM S-5 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 SIMULATOR SETUP MACHINE OPERATOR:

INITIALIZE to IC#235 or any 100% power Initial Condition and PERFORM the following:

  • INSERT overrides for Containment ECUs E-400, E-401, and E-402 for the red START indicating lights off and the green STOP indicating lights on.
  • INSERT malfunction RC03 @ 100%.
  • INSERT malfunction MS03A and MS03B @ 1 to 5% to get Containment pressure to increase above 15 psig and then DELETE malfunctions.

NOTE: Do not place the Simulator in RUN until examinee is ready to begin to preserve RWST level.

PERFORM the following after each JPM:

  • ENSURE 2HV-6293B/A, Train A CCW to Letdown Heat Exchanger valve is OPEN.

EXAMINER:

PROVIDE the examinee with a copy of:

  • SO23-12-11, EOI Supporting Attachments, Attachment 2, Floating Step 14, Terminate Containment Spray Operation.

When Floating Step 14 is complete, PROVIDE the examinee with a copy of:

  • SO23-12-11, EOI Supporting Attachments, Attachment 2, Floating Step 24, Transfer Charging Pump Suction.

Page 2 of 8 SONGS Oct 2009 NRC JPM S-5 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1

- Check Mark Denotes Critical Step START TIME:

Perform Step: 1 Verify Containment pressure - less than 14 psig, and - stable or lowering.

Standard: OBSERVE 2PI-0351-1, 2, 3, & 4, Containment Pressure Narrow Range Indicators on CR-57 or 2PI-0352-1, 2, 3, & 4, Containment Pressure Wide Range Indicators on CR-57 and DETERMINE Containment pressure less than 14 psig, and stable or lowering.

Examiner Cue: Containment pressure is lowering.

Comment: SAT UNSAT Perform Step: 2a Verify at least 2 Containment Emergency Cooling Units operating.

Standard: OBSERVE 2HS-9953-1, Containment ECU 2E399 red START light illuminated.

Comment: SAT UNSAT Perform Step: 2b Verify at least 2 Containment Emergency Cooling Units operating.

Standard: OBSERVE 2HS-9947-1, Containment ECU 2E401 green STOP light illuminated.

Comment: SAT UNSAT Perform Step: 2c Verify at least 2 Containment Emergency Cooling Units operating.

Standard: OBSERVE 2HS-9955-2, Containment ECU 2E402 green STOP light illuminated.

Comment: SAT UNSAT Perform Step: 2d Verify at least 2 Containment Emergency Cooling Units operating.

Standard: OBSERVE 2HS-9939-2, Containment ECU 2E400 green STOP light illuminated.

Comment: SAT UNSAT Page 3 of 8 SONGS Oct 2009 NRC JPM S-5 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Examiner Note: The following steps represent the alternate path for this JPM.

Perform Step: 3 With only Containment Emergency Cooling Unit E399 operating the RNO must be entered.

Standard: RECOGNIZE that the AER column is not met and ENTER the RNO column due to only one Containment Emergency Cooling Unit operating.

Comment: SAT UNSAT Perform Step: 4a Ensure CSAS - actuated.

Standard: VERIFY that CSAS is actuated and OBSERVE:

Comment: SAT UNSAT Perform Step: 4b Ensure CSAS - actuated.

Standard: VERIFY that Train A CSAS is actuated and OBSERVE:

  • 2HV-9367, CNTMT Spray HDR No 1 Control Valve red JOG OPEN illuminated with valve position indication 100% OPEN.

Comment: SAT UNSAT Perform Step: 4c Ensure CSAS - actuated.

Standard: VERIFY that Train B CSAS is actuated and OBSERVE:

  • 2HV-9368, CNTMT Spray HDR No 2 Control Valve red JOG OPEN illuminated with valve position indication 100% OPEN.

Comment: SAT UNSAT Page 4 of 8 SONGS Oct 2009 NRC JPM S-5 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 5 Close CCW to/from Letdown Heat Exchanger Valves:

  • Train A - HV-6293B/A Standard: DEPRESS 2HV-6293B/A, CCW CLA LTDN HX 2E062 Supply/Return Valves CLOSE pushbutton and OBSERVE green CLOSE light illuminated.

Comment: SAT UNSAT Perform Step: 6 Close CCW to/from Letdown Heat Exchanger Valves:

  • Train B - HV-6522B/A Standard: OBSERVE 2HV-6522B/A, CCW CLB LTDN HX 2E062 Supply/Return Valves green CLOSE light illuminated.

Comment: SAT UNSAT Perform Step: 7 GO TO next applicable floating step.

Standard: GO TO next applicable floating step.

Examiner Cue: The Control Room Supervisor directs you to perform Floating Step 24, Transfer Charging Pump Suction.

Comment: SAT UNSAT Examiner Cue: PROVIDE copy of Floating Step 24, Transfer Charging Pump Suction.

Perform Step: 8 VERIFY elapsed time from SIAS actuation - greater than 1-1/2 hours.

Standard: DETERMINE elapsed time from SIAS actuation greater than 1-1/2 hours from Initial Conditions.

Comment: SAT UNSAT Perform Step: 9 VERIFY elapsed time from SIAS actuation - less than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Standard: DETERMINE elapsed time from SIAS actuation less than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> from Initial Conditions.

Comment: SAT UNSAT Page 5 of 8 SONGS Oct 2009 NRC JPM S-5 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 10 VERIFY RWST level - greater than 6%.

Standard: OBSERVE 2LI-0305-1 through 4, RWT 2T006 Level, and DETERMINE level greater than 6%.

Comment: SAT UNSAT Perform Step: 11 ENSURE LV-0227C, RWST to Charging Pumps Gravity Feed Valve -

open.

Standard: OBSERVE 2LV-0227C, RWT 2T006 Gravity Feed Valve red OPEN and blue MANUAL lights illuminated.

Comment: SAT UNSAT Perform Step: 12 OVERRIDE and STOP BAMU Pumps.

Standard: DEPRESS 2P174, BAMU Pump OVERRIDE then STOP pushbuttons and OBSERVE green STOP and white OVERRIDE lights illuminated.

Comment: SAT UNSAT Perform Step: 13 OVERRIDE and STOP BAMU Pumps.

Standard: DEPRESS 2P175, BAMU Pump OVERRIDE then STOP pushbuttons and OBSERVE green STOP and white OVERRIDE lights illuminated.

Comment: SAT UNSAT Perform Step: 14 OVERRIDE and CLOSE boration valves:

  • Gravity Feed: HV-9235 Standard: DEPRESS 2HV-9235, BAMU TK 2T072 Gravity Feed Valve OVERRIDE then CLOSE pushbuttons and OBSERVE green CLOSE and white OVERRIDE lights illuminated.

Comment: SAT UNSAT Perform Step: 15 OVERRIDE and CLOSE boration valves:

  • Gravity Feed: HV-9240 Standard: DEPRESS 2HV-9240, BAMU TK 2T071 Gravity Feed Valve OVERRIDE then CLOSE pushbuttons and OBSERVE green CLOSE and white OVERRIDE lights illuminated.

Comment: SAT UNSAT Page 6 of 8 SONGS Oct 2009 NRC JPM S-5 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 16 OVERRIDE and CLOSE boration valves:

  • Emergency Boration Isolation: HV-9247 Standard: DEPRESS 2HV-9247, EMER Boration Block Valve OVERRIDE then CLOSE pushbuttons and OBSERVE green CLOSE and white OVERRIDE lights illuminated.

Comment: SAT UNSAT Perform Step: 17 Ensure LV-0227B, Volume Control Tank Outlet valve - closed.

Standard: OBSERVE 2LV-0227B, Volume Control Tank Outlet Block Valve green CLOSE and blue MANUAL lights illuminated.

Terminating Cue: This JPM is complete.

Comment: SAT UNSAT STOP TIME:

Page 7 of 8 SONGS Oct 2009 NRC JPM S-5 Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: Given the following conditions:

  • A Loss of Coolant Accident inside Containment has occurred.
  • SO23-12-11, EOI Supporting Attachments, Attachment 2, Floating Steps, is being performed 105 minutes after the accident.

INITIATING CUE: The Control Room Supervisor directs you to PERFORM SO23-12-11, EOI Supporting Attachments, Floating Step 14, Terminate Containment Spray Operation.

Page 8 of 8 SONGS Oct 2009 NRC JPM S-5 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 Facility: SONGS JPM # RO/SRO NRC S-6 Task #186551 K/A #062.A4.01 3.3 / 3.1 SF-6

Title:

Restore Bus 2A06 From 1E Cross-Tie Operations Examinee (Print):

Testing Method:

Simulated Performance: Classroom:

Actual Performance: X Simulator: X Plant:

READ TO THE EXAMINEE I will explain the Initial Conditions, which steps to simulate or discuss, and provide an Initiating Cue.

When you complete the task successfully, the objective for this JPM will be satisfied.

Initial Conditions: Bus 2A06 is cross-tied to Bus 3A06 due to planned maintenance.

Initiating Cue: The Control Room Supervisor directs you to RESTORE Bus 2A06 from 1E Cross-Tie operations to the Reserve Auxiliary Transformer 2XR2 per SO23-6-2, Transferring of 4 kV Buses, Section 6.5, Restoring from 1E 4 kV Bus 2A06 to 3A06 Cross-tie Operation.

Task Standard: Locate and correctly perform Critical Steps of SO23-6-2.

Required Materials: SO23-6-2, Transferring of 4 kV Buses, Rev. 14.

Validation Time: 9 minutes Time Critical: N/A Completion Time: ________ minutes Comments:

Result: SAT UNSAT Examiner (Print / Sign): Date:

Page 1 of 8 SONGS Oct 2009 NRC JPM S-6 Rev 0.doc

Appendix C JPM WORKSHEET Form ES-C-1 SIMULATOR SETUP MACHINE OPERATOR:

INITIALIZE to IC#236 or any 100% power Initial Condition and PERFORM the following:

  • ALIGN (cross-tie) Bus 2A06 to Bus 3A06 using SO23-6-2, Section 6.4.
  • ENSURE Bus 2A06 & Bus 3A06 AUTO/MANUAL Bus Tie Selector Switches are in MANUAL.

NOTE: After each JPM, PLACE Sync Switch key in the Non-ESF Sync Master keylock on the vertical section of CR-63.

EXAMINER:

PROVIDE the examinee with a copy of:

  • SO23-6-2, Transferring of 4 kV Buses.

Page 2 of 8 SONGS Oct 2009 NRC JPM S-6 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1

- Check Mark Denotes Critical Step START TIME:

Perform Step: 1 Ensure the affected Switchgear Room is clear of all unnecessary personnel and maintain it clear until after 4kV bus transfer is complete Standard: DIRECT a PEO to clear the Switchgear Room and keep personnel clear until the bus transfer is complete.

M.O. Cue: All personnel are clear of the Switchgear Room.

Comment: SAT UNSAT Perform Step: 2a Prepare to Close the INCOMING Transformer breaker, as follows:

Standard: INSERT key and TURN 2HS-1627-2, TRAIN B SYNC CKT CONTROL ESF B SYNC MASTER to the ON position.

Comment: SAT UNSAT Perform Step: 2b Prepare to Close the INCOMING Transformer breaker, as follows:

  • DEPRESS the SYNC pushbutton for the INCOMING Transformer breaker to energize the synchronizing circuit:

2A0618, 2XR2 Reserve Aux. Transformer Standard: DEPRESS 2HS-1637-2, RES AUX XFMR 2XR2 FDR BREAKER 2A0618 SYNC pushbutton.

Comment: SAT UNSAT Perform Step: 2c Prepare to Close the INCOMING Transformer breaker, as follows:

  • Verify ILLUMINATED the INCOMING Transformer Breaker SYNC pushbutton.

Standard: OBSERVE 2HS-1637-2, RES AUX XFMR 2XR2 FDR BREAKER 2A0618 white SYNC light illuminated.

Comment: SAT UNSAT Page 3 of 8 SONGS Oct 2009 NRC JPM S-6 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 2d Prepare to Close the INCOMING Transformer breaker, as follows:

  • VERIFY ILLUMINATED the SYNC IN MODE light.

Standard: OBSERVE 2HS-1627-2 ESF B SYNC MASTER white SYNC IN MODE light illuminated on TRAIN B SYNC CKT CONTROL.

Comment: SAT UNSAT Perform Step: 2e Prepare to Close the INCOMING Transformer breaker, as follows:

  • VERIFY EXTINGUISHED the SYNC RELAYS TROUBLE light.

Standard: OBSERVE 2HS-1627-2, ESF B SYNC MASTER red SYNC RELAYS TROUBLE light extinguished on TRAIN B SYNC CKT CONTROL.

Comment: SAT UNSAT Perform Step: 2f Prepare to Close the INCOMING Transformer breaker, as follows:

  • VERIFY the Synchroscope moves to the straight up (12 o'clock)

Standard: VERIFY 2/3SI-1627A, SYNCHROSCOPE moves to straight up (12 o'clock) position.

Comment: SAT UNSAT Perform Step: 2g Prepare to Close the INCOMING Transformer breaker, as follows:

  • VERIFY matched Incoming and Running voltages.

Standard: OBSERVE 2/3EI-1627A, RUNNING VOLTS and 2/3EI-1627B, INCOMING VOLTS voltmeters MATCHED.

Comment: SAT UNSAT Perform Step: 2h Prepare to Close the INCOMING Transformer breaker, as follows:

  • VERIFY MATCHED Incoming and Running Frequencies.

Standard: OBSERVE 2/3SI-1627C, RUNNING HERTZ and 2/3SI-1627D, INCOMING HERTZ frequency meters MATCHED.

Comment: SAT UNSAT Page 4 of 8 SONGS Oct 2009 NRC JPM S-6 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 3a CLOSE the INCOMING Transformer breaker:

  • 2A0618, 2XR2 Reserve Aux. Transformer Standard: DEPRESS 2HS-1637-2, RES AUX XFMR 2XR2 FDR BREAKER 2A0618 CLOSE pushbutton and OBSERVE red CLOSE light illuminated and green TRIP light extinguished.

Comment: SAT UNSAT Perform Step: 3b VERIFY ANNUNCIATED 2UA63C58, 2A06/3A06 PARALLELED.

Standard: OBSERVE and ACKNOWLEDGE annunciator 2UA63C58 - 2A06/3A06 PARALLELED.

Comment: SAT UNSAT Perform Step: 3c VERIFY 3UA63C58, 3A06/2A06 PARALLELED, REMAINS ANNUNCIATED.

Standard: OBSERVE annunciator 3UA63C58 - 3A06/2A06 PARALLELED illuminated.

Examiner Cue: The annunciator is illuminated.

Comment: SAT UNSAT Perform Step: 4a DEPRESS the SYNC pushbutton for the INCOMING Transformer breaker to de-energize the synchronizing circuit:

  • 2A0618, 2XR2 Reserve Aux. Transformer Standard: DEPRESS 2HS-1637-2, RES AUX XFMR 2XR2 FDR BREAKER 2A0618 SYNC pushbutton.

Comment: SAT UNSAT Perform Step: 4b VERIFY EXTINGUISHED the INCOMING Transformer breaker SYNC pushbutton.

Standard: OBSERVE 2HS-1637-2, RES AUX XFMR 2XR2 FDR BREAKER 2A0618 white SYNC light extinguished.

Comment: SAT UNSAT Page 5 of 8 SONGS Oct 2009 NRC JPM S-6 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 5a OPEN (TRIP) 2A0619, Bus Tie 2A06 to 3A06 Feeder Breaker.

Standard: DEPRESS 2HS-1639A2, BUS TIE 2A06 TO 3A06 FDR BKR 2A0619 TRIP pushbutton and OBSERVE green TRIP light illuminated and red CLOSE light extinguished.

Comment: SAT UNSAT Perform Step: 5b VERIFY RESET 2UA63C58, 2A06/3A06 PARALLELED.

Standard: OBSERVE annunciator 2UA63C58 - 2A06/3A06 PARALLELED is slow flashing/reset.

Comment: SAT UNSAT Perform Step: 5c VERIFY RESET 3UA63C58, 3A06/2A06 PARALLELED.

Standard: OBSERVE annunciator 3UA63C58 - 3A06/2A06 PARALLELED is slow flashing/reset.

Examiner Cue: The annunciator is reset.

Comment: SAT UNSAT Perform Step: 6 SELECT 2HS-1627-2, ESF B Sync. Master Control, to OFF.

Standard: TURN key 2HS-1627-2, TRAIN B SYNC CKT CONTROL ESF B SYNC MASTER to the OFF position.

Comment: SAT UNSAT Perform Step: 7 Verify bus 2A06 voltage is stable.

Standard: OBSERVE 2EI-1641-2, 4.16 KV BUS 2A06 VOLTS voltmeter and VERIFY stable.

Comment: SAT UNSAT Perform Step: 8 OPEN (TRIP) 3A0603, Bus Tie 3A06 to 2A06 Feeder Breaker.

Standard: DEPRESS 3HS-1639A2, BUS TIE 3A06 TO 2A06 FDR BREAKER 3A0603 TRIP pushbutton and OBSERVE green TRIP light illuminated and red CLOSE light extinguished.

Comment: SAT UNSAT Page 6 of 8 SONGS Oct 2009 NRC JPM S-6 Rev 0.doc

Appendix C JPM STEPS Form ES-C-1 Perform Step: 9a Return Bus Tie Breakers transfer controls to automatic, as follows:

  • SELECT 3HS-1639B2, 3A06 to 2A06 Tie Breaker 3A0603 AUTO/MANUAL Transfer Switch, to AUTO.

Standard: DEPRESS 3HS-1639B2, BUS TIE 3A06 TO 2A06 FDR BKR 3A0603 SELECTOR AUTO pushbutton and OBSERVE white AUTO light illuminated and blue MANUAL light extinguished.

Comment: SAT UNSAT Perform Step: 9b Return Bus Tie Breakers transfer controls to automatic, as follows:

  • SELECT 2HS-1639B2, 2A06 to 3A06 Tie Breaker 2A0619 AUTO/MANUAL Transfer Switch, to AUTO.

Standard: DEPRESS 2HS-1639B2, 2A06 TO 3A06 FDR BKR 2A0619 SELECTOR AUTO pushbutton and OBSERVE white AUTO light illuminated and blue MANUAL light extinguished Terminating Cue: This JPM is complete.

Comment: SAT UNSAT STOP TIME:

Page 7 of 8 SONGS Oct 2009 NRC JPM S-6 Rev 0.doc

Appendix C JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: Bus 2A06 is cross-tied to Bus 3A06 due to planned maintenance.

INITIATING CUE: The Control Room Supervisor directs you to RESTORE Bus 2A06 from 1E Cross-Tie operations to the Reserve Auxiliary Transformer 2XR2 per SO23-6-2, Transferring of 4 kV Buses, Section 6.5, Restoring from 1E 4 kV Bus 2A06 to 3A06 Cross-tie Operation.

Page 8 of 8 SONGS Oct 2009 NRC JPM S-6 Rev 0.doc

Appendix D Scenario Outline Form ES-D-1 Facility: SONGS 2 and 3 Scenario No.: 1 Op Test No.: October 2009 NRC Examiners: Operators:

Initial Conditions:

  • Train A Component Cooling Water Pump (P-025) in service.
  • Train A Low Pressure Safety Injection Pump (P-015) OOS for oil change.
  • Fire Computer is OOS.

Turnover: Maintain steady-state power conditions.

Critical Tasks:

  • Trip the Reactor following multiple CEA drops.
  • Establish minimum design Safety Injection flow rate (SIAS component failure).

Event No. Malf. No. Event Type* Event Description 1 CH04D TS (CRS) Containment Wide Range Pressure Transmitter (PT-0352-4) fails

+10 min high.

2 FC05B I (BOP, CRS) Steam Generator (E-088) Main Feedwater Master Controller

+20 min setpoint fails to 50% level on 60 second ramp.

3 RD4403 C (RO, BOP, CRS) Dropped CEA #44.

+30 min TS (CRS) 4 R (RO) Power reduction for dropped CEA.

+45 min N (BOP, CRS) 5 RD0303 C (RO, CRS) Dropped CEA #3. Manual Reactor trip required.

+45 min 6 RC01A M (RO, BOP, CRS) Large Break Loss of Coolant Accident upon Unit trip.

+50 min 7 Bus 2A07 I (BOP) Non-1E 4160 Volt Bus 2A07 auto transfer failure upon Unit trip.

+50 min XFR LP 8 RP01E C (RO) Low Pressure Safety Injection Pump (P-016) fails to auto start.

+55 min

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (TS)Technical Specifications SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc

Appendix D Scenario Outline Form ES-D-1 SCENARIO

SUMMARY

NRC #1 The crew will assume the watch and maintain steady-state conditions per Operating Instruction (OI)

SO23-5-1.7, Power Operations.

The first event is a Containment Wide Range Pressure Transmitter failure. The crew will respond per Abnormal Operating Instruction (AOI) SO23-13-18, Reactor Protection System Failure/Loss of Vital Bus and Operating Instruction (OI) SO23-3-2.12, Reactor Protective System Operation. The CRS will evaluate Technical Specifications.

When Technical Specification actions are complete, Steam Generator E-088 Master Controller Setpoint fails to 50%. Entry into AOI SO23-13-24, Feedwater Control System Malfunction is required. The CRS will analyze the cause of the failure using Attachment 1 of SO23-13-24. Steam Generator level control is restored by placing the Master Controller in Manual. When Steam Generator level control is achieved the controller will be returned to automatic operation.

When level control is regained, Control Element Assembly #44 will drop into the core. Crew actions are per AOI SO23-13-13, Misaligned or Immovable Control Element Assembly and include a power reduction as required per procedure. The crew will restore RCS Cold Leg temperature per OI SO23-5-1.7, Power Operations and block any further load changes and then continue with a power reduction as required per SO23-13-13. The CRS will evaluate Technical Specifications.

When the crew commences recovery of CEA #44, a second Control Element Assembly will drop into the core necessitating a manual Reactor trip.

When the Reactor is tripped, a Large Break Loss of Coolant Accident will occur. The crew will enter Emergency Operating Instruction (EOI) SO23-12-1, Standard Post Trip Actions and then transition to EOI SO23-12-3, Loss of Coolant Accident. Post trip events include a Non-1E 4160 Volt Bus that fails to transfer as well as a Low Pressure Safety Injection Pump start failure. Both of these failures require actions on the part of the Reactor and Balance of Plant Operators.

The scenario is terminated when conditions for reactor coolant system cooldown is reached.

Risk Significance:

  • Risk important components out of service: LPSI Pump (P-015)

Emergency Diesel Generator (G-002)

  • Failure of risk important system prior to trip: Dropped Control Element Assembly
  • Risk significant core damage sequence: Large Break LOCA
  • Risk significant operator actions: Trip Reactor Following Multiple CEA Drop Trip RCPs Due to Loss of CCW Establish Minimum Safety Injection Flowrate SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc

Scenario Event Description NRC Scenario #1 SONGS 2009 Facility NRC Initial License Examination Simulator Scenario Setup Machine Operator: EXECUTE IC #221 and NRC Scenario #1 SETUP file to align components.

HANG Control Board Tags on P-015 and G-002.

CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario boron concentration.

VERIFY both Pressurizer Spray Valves in AUTO.

PLACE 2G002 EDG in MAINTENANCE LOCKOUT.

PLACE procedures in progress on the RO desk:

- Copy of SO32-5-1.7, Power Operations open to Section 6.1, Guidelines for Steady State Operation.

PLACE the MOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board.

Control Room Annunciators in Alarm:

57A51 - SI / ECW TRAIN A INOPERABLE 57A55 - STANDBY POWER SYS TRAIN A INOPERABLE 63B07 - DIESEL GEN 2G002 LOCKOUT RELAY TRIPPED SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 1 Page 4 of 18 Event

Description:

Containment Wide Range Pressure Transmitter Failure Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 1.

- CH04D, Containment Pressure Transmitter (PT-0352-4) fails high.

Indications Available:

56A08 - CTMT PRESS HI-HI ESFAS CHANNEL TRIP 56A18 - CTMT PRESS HI-HI ESFAS PRETRIP 56B36 - PPS CHANNEL 4 TROUBLE

+ 1 min RO REFER to Annunciator Response Procedures.

RECOGNIZE Containment Pressure Channel failure and INFORM the CRS RO AOI SO23-13-18 entry required.

DIRECT performance of AOI SO23-13-18, Reactor Protection System CRS Failure/Loss of Vital Bus.

DETERMINE failure by observing instrumentation for the affected channel RO and alternate redundant indications monitoring the same parameter.

RO IDENTIFY Containment Pressure Channel PT-0352-4 failure.

CRS REFER to Attachment 5 and DETERMINE Functional Unit(s) affected.

PLACE the affected Functional Unit in BYPASS per SO23-3-2.12, Reactor RO Protection System.

M.O. Cue: When directed, EXECUTE the following Remote Functions:

RP51 = OPEN (PPS Door Open Annunciator 56B46)

RP55S = BYPASS (Containment Pressure Channel D)

Delete RP51 (PPS Door Open Annunciator 56B46)

RO VERIFY the Trip Channel Bypassed Annunciator alarm.

  • 56A59 - PPS CHANNEL 4 TRIP BYPASSED.

RO LOG the BYPASS and reason in the Control Operator Log.

SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 1 Page 5 of 18 Event

Description:

Containment Wide Range Pressure Transmitter Failure Time Position Applicants Actions or Behavior CRS INITIATE a LCOAR or follow guidelines of SO123-0-A5.

+ 10 min CRS EVALUATE Technical Specifications.

  • CONDITION A - One or more Functions with one automatic ESFAS trip channel inoperable.
  • ACTION A.1 - Place Functional Unit in bypass or trip within one (1) hour.

When Technical Specifications have been evaluated, or at Lead Evaluators discretion, PROCEED to Event 2.

SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 2 Page 6 of 18 Event

Description:

Steam Generator E088 Master Controller Setpoint Failure Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 2.

- FC05B, E088 Master Controller Setpoint failure to 50% level on 60 second ramp.

Indications available:

52A02 - FWCS SG2 E088 LEVEL DEVIATION 52A13 - FWCS TROUBLE 53B23 - CONDENSATE FLOW BALANCE TROUBLE (possible)

SG E088 Feedwater Control Valve modulating closed then opens as SG level stabilizes at 50%

SG E088 level lowering

+30 sec BOP REFER to Annunciator Response Procedure.

RECOGNIZE E088 Master Controller Setpoint lowering to 50% and INFORM BOP the CRS AOI SO23-13-24 entry required.

DIRECT performance of AOI SO23-13-24, Feedwater Control System CRS Malfunctions.

BOP DETERMINE that SG E088 level is low.

BOP DETERMINE that SG E088 Master Controller output is lowering.

+5 min PLACE SG E088 Master Controller in PREFERRED MANUAL and raise BOP output.

Floor Cue: If required, REPORT as Shift Manager to maintain SG level at 67%.

BOP DETERMINE that SG E088 Feed Control Valve is opening.

BOP DETERMINE that Main Feedwater Pumps K-005 and K-006 speed is rising.

SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 2 Page 7 of 18 Event

Description:

Steam Generator E088 Master Controller Setpoint Failure Time Position Applicants Actions or Behavior M.O. Cue: DELETE malfunction and CONTACT the Control Room as I&C. REPORT the controller logic is fixed and the Master Controller may be returned to AUTO.

VERIFY SG E088 level is stable at or near program level with SG E088

+10 min BOP Master Controller in MANUAL.

When SG level is restored, or at Lead Evaluators discretion, PROCEED to Events 3 and 4.

SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 3 and 4 Page 8 of 18 Event

Description:

Dropped Control Element Assembly #44 / Downpower Due to Dropped CEA Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Events 3 and 4.

- RD4403, Dropped Control Element Assembly #44.

Indications Available:

50A02 - COLSS ALARM 50A28 - CEA DEVIATION 50A36 - POWER DEPENDENT INSERTION LIMIT 50A37 - PRE-POWER DEPENDENT INSERTION LIMIT 50A38 - CEA GROUP DEVIATION 50A10 - CEDMCS CEA WITHDRAWAL PROHIBIT 56A03 - LOCAL POWER DENSITY HI CHANNEL TRIP 56A04 - DNBR LO CHANNEL TRIP 56A13 - LOCAL POWER DENSITY HI PRETRIP 56A14 - DNBR LO RPS PRETRIP CEA #44 Rod Bottom indication

+30 sec RECOGNIZE that Regulating Group 5 CEA #44 has dropped and INFORM RO the CRS AOI SO23-13-13 entry required.

DIRECT performance of AOI SO23-13-13, Misaligned or Immovable Control CRS Element Assembly.

RO VERIFY that no more than one CEA is misaligned > 7 inches.

RO ENSURE CEDMCS Mode Selector Switch in OFF.

REDUCE Turbine load to restore RCS Tcold to the pre-CEA drop value and BOP BLOCK load changes.

M.O. Cue: If sent as Radwaste or I&C to investigate CEDMCS, WAIT 5 minutes and REPORT that a tripped breaker was located. REQUEST permission to reclose one time.

RO VERIFY Reactor is critical.

RECORD initial and stabilized reactor power for subsequent SDM CRS calculation.

Within 15 minutes, DIRECT monitoring of DNBR and LPD per SO23-3-3.6, CRS Attachment for DNBR Margin and Linear Heat Rate Limit Monitoring.

SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 3 and 4 Page 9 of 18 Event

Description:

Dropped Control Element Assembly #44 / Downpower Due to Dropped CEA Time Position Applicants Actions or Behavior Floor Cue: The Work Control Supervisor will complete the DNBR and LPD monitoring in accordance with SO23-3-3.6, Attachment 1.

CRS DIRECT performance of Attachment 3, Misaligned CEA Checklist.

Floor Cue: The Work Control Supervisor will also complete SO23-3-3.6, Attachment 3.

Within 15 minutes of discovery, DIRECT initiation of Reactor power CRS reduction.

  • For Non Group 6 Full Length CEA, REDUCE power 10% within 60 minutes.

Examiner Note: CRS should recognize that power reduction due to dropped CEA (~3%)

satisfies the 15 minute requirement to initiate a power reduction. The remaining power reduction must be accomplished within 60 minutes.

COMMENCE lowering Turbine Generator load using CVOL while maintaining BOP Tcold per SO23-5-1.7, Power Operations.

DIRECT initiation of boration of the RCS per SO23-3-2.2, Makeup CRS Operations to achieve target power level.

RO COMMENCE attempting to control ASI near full power ESI.

Floor Cue: If required, DIRECT CRS as the Shift Manager to commence the downpower.

CRS REQUEST Reactor Engineering to report to the Control Room.

CRS INITIATE recovery of affected CEA per Attachment 1.

RO VERIFY CEA position indications agree:

  • COMPARE affected CEA PIDs from CEAC No. 1 and 2 at CPC Operator Console.

SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 3 and 4 Page 10 of 18 Event

Description:

Dropped Control Element Assembly #44 / Downpower Due to Dropped CEA Time Position Applicants Actions or Behavior

  • COMPARE affected CEA PIDs from CEAC No. 1 and 2 at Secondary Rod Position CRT.
  • CHECK UEL and LEL lights.

VERIFY one CEA has not been misaligned >7 inches for an unknown RO/CRS duration.

DIRECT performance of SO23-3-2.19, CEDMCS Operation to confirm that CRS the CEA is movable in the Manual Individual Mode.

RO WITHDRAW CEA #44 using the Manual Individual Mode per SO23-3-2.19.

CRS/RO REALIGN CEA #44 to the group per SO23-3-2.19, CEDMCS Operation.

+20 min CRS EVALUATE Technical Specifications.

  • CONDITION A - One Regulating CEA trippable and misaligned from its group by >7 inches.
  • ACTION A.1 - Initiate THERMAL POWER reduction in accordance with COLR requirements within 15 minutes.
  • ACTION A.2 - Restore the misaligned CEA(s) to within 7 inches of its group within two (2) hours.

Examiner Note: Event 5 can be performed at any time during CEA #44 recovery.

When a 3-5% power reduction is completed, or at Lead Evaluators discretion, PROCEED to Event 5.

SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 5 Page 11 of 18 Event

Description:

Dropped Control Element Assembly #3 / Manual Reactor Trip Required Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 5.

- RD0303, Dropped CEA #3.

Indications Available:

50A28 - CEA DEVIATION 50A38 - CEA GROUP DEVIATION 50A10 - CEDMCS CEA WITHDRAWAL PROHIBIT CEA #3 Rod Bottom indication

+10 secs RO RECOGNIZE 2nd dropped CEA #3 and manually INITIATE a Reactor trip.

Within five (5) minutes of a second CEA dropping into the Core, trip the CRITICAL TASK Reactor.

STATEMENT Elapsed Time: __________

CRITICAL TASK RO/BOP MANUALLY TRIP the Reactor.

+1 min CRS DIRECT performance of SO23-12-1, Standard Post Trip Actions.

When the Reactor is tripped, or at Lead Evaluators discretion, PROCEED to Events 6, 7, and 8.

SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 6, 7, & 8 Page 12 of 18 Event

Description:

Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Events 6, 7, and 8.

- RC01A, Large Break LOCA.

- Bus 2A07 LP, Bus 2A07 Transfer Failure.

- RP01E, LPSI Pump P016 fails to auto start.

Indications available:

Numerous Reactor and Turbine trip related alarms CRS DIRECT performance of SO23-12-1, Standard Post Trip Actions.

RO VERIFY Reactor Trip:

  • VERIFY Reactor Power lowering and Startup Rate negative.
  • VERIFY maximum of one full length CEA NOT fully inserted.

CRS VERIFY Reactivity Control criteria satisfied.

BOP VERIFY Turbine Trip:

  • HP and LP Stop and Governor Valves closed.
  • VERIFY both Unit Output Breakers open.

CRS INITIATE Administrative Actions:

  • INITIATE Attachment 4, Worksheet.
  • INITIATE Attachment 5, Administrative Actions.

BOP VERIFY Vital Auxiliaries criteria satisfied:

  • VERIFY both 1E 4 kV Buses A04 and A06 energized.
  • VERIFY both 1E 480 V Buses B04 and B06 energized.
  • VERIFY all 1E DC Buses energized.

SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 6, 7, & 8 Page 13 of 18 Event

Description:

Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time Position Applicants Actions or Behavior BOP

  • DETERMINE one Non-1E 4 kV Bus deenergized.
  • [RNO] TRANSFER Non-1E 4 kV Bus 2A07 to Reserve Auxiliary Transformer.
  • VERIFY both CCW Trains operating and NOT aligned to Non-Critical BOP Loop and Letdown Heat Exchanger.
  • [RNO] If CIAS actuated, ENSURE all RCPs stopped.

Within 10 minutes of a loss of CCW or low subcooling alarm annunciation, the CRITICAL TASK affected RCP(s) will be stopped.

STATEMENT Elapsed Time: __________

CRITICAL TASK BOP STOP all RCPs due to CIAS.

RO DETERMINE RCS Inventory Control criteria NOT satisfied:

  • DETERMINE PZR level NOT between 10% and 70% AND NOT trending to between 30% and 60%.
  • DETERMINE Core Exit Saturation Margin < 20°F:

Within 15 minutes of SFSC Inventory Control completion following RCS CRITICAL TASK pressure falling below 1400 psia, the crew establishes the required SI flow.

STATEMENT Elapsed Time: __________

CRITICAL ESTABLISH minimum design Safety Injection flowrate; START LPSI Pump TASK RO P016.

RO DETERMINE RCS Pressure Control criteria NOT satisfied:

  • DETERMINE PZR pressure (WR and NR) NOT between 1740 PSIA and 2380 PSIA AND NOT trending to between 2025 PSIA and 2275 PSIA.
  • [RNO] DETERMINE PZR Pressure Control System is NOT restoring PZR pressure.
  • [RNO] ENSURE Normal and Aux Spray valves closed.

SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 6, 7, & 8 Page 14 of 18 Event

Description:

Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time Position Applicants Actions or Behavior

  • [RNO] If PZR pressure (WR) is less than 1740 psia, ENSURE SIAS/CCAS/CRIS actuated.
  • [RNO] If PZR pressure (WR) is less than 1430 psia, ENSURE one RCP and each loop stopped.
  • [RNO] If RCP NPSH requirements of Attachment 3 NOT satisfied, THEN ENSURE all RCPs stopped.

RO DETERMINE Core Heat Removal criteria is NOT satisfied:

  • DETERMINE no RCPs operating.
  • DETERMINE Core Exit Saturation Margin < 20°F.

BOP DETERMINE RCS Heat Removal criteria NOT satisfied:

  • VERIFY at least one SGs level between 21% and 80% NR AND Feedwater available.
  • [RNO] ENSURE EFAS actuated.
  • DETERMINE Tcold < 545°F and NOT controlled.
  • [RNO] ENSURE SBCS valves closed.
  • [RNO] ENSURE ADVs closed.
  • [RNO] ENSURE SG Blowdown valves closed.
  • E-088 - HV-4054 E-089 - HV-4053
  • [RNO] ENSURE Main Steam to Reheater Valves closed.
  • HV-2703 or HV-2704; HV-2721; HV-2751
  • VERIFY SG pressures > 740 PSIA.

BOP DETERMINE MSIVs closed due to CIAS.

RO DETERMINE Containment Isolation criteria NOT satisfied:

  • DETERMINE Containment pressure > 1.5 PSIG.
  • [RNO] DETERMINE Containment pressure > 3.4 PSIG.
  • [RNO] ENSURE SIAS, CIAS, CCAS, and CRIS actuated.

SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 6, 7, & 8 Page 15 of 18 Event

Description:

Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time Position Applicants Actions or Behavior

  • DETERMINE Containment Area Radiation Monitors energized AND RO/BOP alarming or trending to alarm.
  • VERIFY Secondary Plant Radiation Monitors energized AND NOT alarming or trending to alarm.

RO DETERMINE Containment Temperature and Pressure criteria NOT satisfied:

  • DETERMINE Containment average temperature > 120°F.
  • DETERMINE Containment pressure > 1.5 PSIG.
  • [RNO] ENSURE proper functioning of the Normal Containment Cooling.
  • [RNO] ENSURE at least one Containment Dome Air Circulator operating.
  • [RNO] DETERMINE Containment pressure > 3.4 PSIG.
  • [RNO] ENSURE all RCPs stopped.
  • [RNO] ENSURE all available Containment Emergency Cooling Units operating.
  • DETERMINE Containment pressure > 14 PSIG.
  • [RNO] ENSURE CSAS actuated.

+15 min CRS DIAGNOSE Event in Progress:

  • DETERMINE most Safety Function criteria are NOT met per Attachment 4, Worksheet.
  • [RNO] COMPLETE Attachment 1, Recovery Diagnostics.
  • [RNO] DIAGNOSE Loss of Coolant Accident.
  • [RNO] DETERMINE all RCPs stopped.
  • DIRECT initiating Steps 12 through 15.

BOP INITIATE Steps 12 through 15.

CRS DIRECT performance of SO23-12-3, LOCA.

  • RECORD time of EOI entry __________.

SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 6, 7, & 8 Page 16 of 18 Event

Description:

Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time Position Applicants Actions or Behavior

+15 min CRS VERIFY LOCA diagnosis:

  • INITIATE SO23-12-10, Safety Function Status Checks.
  • INITIATE Foldout Page.
  • DIRECT performance of FS-7, Verify SI Throttle/Stop Criteria.
  • DIRECT performance of FS-3, Monitor Natural Circulation.
  • DIRECT performance of Attachment 22, Non-Qualified Loads Restoration.
  • VERIFY LOCA diagnosis using Figure 1, Break Identification Chart.

M.O. Cue: If directed to sample SGs, WAIT 5 minutes and then REPORT that E088 and E089 both have activity near background, and normal boron levels. If the SG sample valves are closed, REPORT unable to establish sample flow.

CRS INITIATE Administrative actions:

  • NOTIFY Shift Manager/Operations Leader of SO23-12-3, Loss of Coolant Accident initiation.
  • IMPLEMENT Placekeeper.

RO VERIFY ESF actuation.

  • ENSURE the following actuated:

BOP STOP unloaded Train B Diesel Generator (SIAS Override STOP).

BOP INITIATE SO23-12-11, Attachment 22, Non-Qualified Load Restoration.

M.O. Cue: When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored Non-Qualified Loads.

SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 6, 7, & 8 Page 17 of 18 Event

Description:

Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time Position Applicants Actions or Behavior RO ESTABLISH Optimum SI Alignment:

  • ESTABLISH two train operation.
  • All Charging Pumps operating.
  • One Train B HPSI and one Train B LPSI operating.
  • One Train A HPSI operating.
  • All Cold leg flow paths aligned.
  • VERIFY SI flow required:
  • SI flow indicated.

RO VERIFY PZR pressure:

  • DETERMINE RCP NPSH requirements of SO23-12-11, Attachment 29 NOT satisfied.
  • [RNO] VERIFY all RCPs stopped.
  • [RNO] INITIATE FS-3, Monitor Natural Circulation.

RO VERIFY Letdown isolated.

VERIFY outside Containment radiation alarms - NOT alarming or trending to RO alarm.

RO VERIFY outside Containment sump levels - NOT abnormally rising.

RO VERIFY RCS sample valves, RCS and PZR head vents are closed.

RO VERIFY CCW parameters are normal.

CRS/RO VERIFY PZR Safety Valves are closed.

SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 1 Event # 6, 7, & 8 Page 18 of 18 Event

Description:

Large Break LOCA / Bus 2A07 Transfer Failure / LPSI Pump Auto Start Failure Time Position Applicants Actions or Behavior DETERMINE rate of RCS inventory and pressure loss greater than available CRS/RO Charging Pump capacity.

+30 min CRS DIRECT initiation of RCS cooldown.

When the RCS cooldown is initiated, or at Lead Evaluators discretion, TERMINATE the scenario.

SONGS Oct 2009 NRC Sim Scenario #1 Rev 0.doc

Appendix D Scenario Outline Form ES-D-1 Facility: SONGS 2 and 3 Scenario No.: 2 Op Test No.: October 2009 NRC Examiners: Operators:

Initial Conditions:

  • Train A Component Cooling Water Pump (P-025) in service.
  • Train A Low Pressure Safety Injection Pump (P-015) OOS for oil change.
  • Fire Computer is OOS.

Turnover: Maintain steady-state power conditions.

Critical Tasks:

  • Restore Component Cooling Water flow to the Non-Critical Loop.
  • Restore power to at least one 1E 4 kV Bus (Station Blackout).

Event No. Malf. No. Event Type* Event Description 1 ED11 TS (CRS) Loss of Control Room Annunciators.

+10 min 2 FW08B C (BOP, CRS) Main Feedwater Pump Turbine (P-063) loss of oil pressure.

+15 min 3 R (RO) Rapid Power Reduction to 70% for loss of one Main Feed Pump.

+35 min N (BOP, CRS) 4 ED03A C (RO, BOP, CRS) Loss of 1E 4160 Volt Bus 2A04.

+50 min TS (CRS) 5 TU08 M (RO, BOP, CRS) Loss of Offsite Power.

+50 min PG24 6 EG08B M (RO, BOP, CRS) Emergency Diesel Generator (G-003) fails to start.

+50 min Station Blackout.

7 FW25 C (BOP) Turbine Driven Auxiliary Feedwater Pump (P-140) trips on

+55 min overspeed (300 seconds post-trip). Loss of Feedwater.

8 CVCS LP I (RO) Boric Acid Makeup Tank Gravity Feed Valves fail to open during

+ min boration.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (TS)Technical Specifications SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Scenario Outline Form ES-D-1 SCENARIO

SUMMARY

NRC #2 The crew will assume the watch and maintain steady-state conditions per Operating Instruction (OI)

SO23-5-1.7, Power Operations.

The first event is a Loss of Control Room Annunciators. The crew will respond per Abnormal Operating Instruction (AOI) SO23-13-22, Loss of Control Room Annunciators. Actions include aligning an alternate power supply to the Control Room Annunciators. The CRS will evaluate Technical Specifications.

When the annunciators are restored, a loss of oil pressure to Main Feedwater Pump P-063 will occur.

The crew will respond per the Annunciator Response Procedures (ARP) and AOI SO23-13-24, Feedwater Control System Malfunction and determine that a Main Feedwater Pump trip is warranted.

This will necessitate entry into AOI SO23-13-28, Rapid Power Reduction in order to low power below the threshold for one (1) Main Feedwater Pump operation.

When plant conditions are stable, a loss of 1E 4160 Volt Bus 2A04 will occur. The crew will enter him the AOI SO23-13-26, Loss of Power to an AC Bus. Crew actions include placing a Charging Pump in service as well as transferring to the Train B Component Cooling Water System. The CRS will evaluate Technical Specifications.

The major event is a Loss of Offsite Power that requires entry into Emergency Operating Instruction (EOI) SO23-12-1, Standard Post Trip Actions. During performance of the Standard Post Trip Actions, the Train B Emergency Diesel Generator fails to start. Additionally, five (5) minutes post-trip the Turbine Driven Auxiliary Feedwater Pump will trip on overspeed. With a Station Blackout and Loss of Feedwater, the CRS will be required to enter Functional Recovery Procedure (FRP) SO23-12-9, Functional Recovery. Boric Acid Makeup Tank Gravity Feed Valves fail to open during boration and the Reactor Operator will be required to manually align the Refueling Water Storage Tank.

With Switchyard power unavailable, restoration of Unit 2 1E 4160 Volt Bus 2A06 will be via a crosstie with Unit 3 1E 4160 Volt Bus 3A06. Once the crosstie is successful, Auxiliary Feedwater Pump P-504 can be started to restore feedwater flow to Steam Generator E-088.

The scenario is terminated when the 1E Bus is reenergized, feedwater flow is restored, and boration via the RWST is commenced.

Risk Significance:

  • Risk important components out of service: LPSI Pump (P-015)

Emergency Diesel Generator (G-002)

  • Failure of risk important system prior to trip: Loss of 4160 V Bus 2A04
  • Risk significant core damage sequence: Station Blackout with Loss of Feedwater
  • Risk significant operator actions: Restore Flow to Non-Critical Loop Crosstie Bus 3A06 with Bus 2A06 Align Feedwater Flow to a Steam Generator SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Scenario Event Description NRC Scenario #2 SONGS 2009 Facility NRC Initial License Examination Simulator Scenario Setup Machine Operator: EXECUTE IC #222 and NRC Scenario #2 SETUP file to align components.

HANG Control Board Tags on P-015, P-050 and G-002.

CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario born concentration.

RESET CVCS Batch Counters to zero (0).

VERIFY both Pressurizer Spray Valves in AUTO.

PLACE Channel X Pressurizer Pressure and Pressurizer Level in service.

PLACE procedures in progress on the RO desk:

- Copy of SO23-5-1.7, Power Operations open to Section 6.1, Guidelines for Steady State Operation.

PLACE the BOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board.

If Group Position(s) is (are) not correct, MOVE CEAs and then RETURN CEAs to Shift Turnover Sheet position (Group 6 @ 137 / PLCEAs @ 115).

Control Room Annunciators in Alarm:

57A51 - SI / ECW TRAIN A INOPERABLE 57A55 - STANDBY POWER SYS TRAIN A INOPERABLE 63B07 - DIESEL GEN 2G002 LOCKOUT RELAY TRIPPED SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 1 Page 4 of 22 Event

Description:

Loss of Control Room Annunciators Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 1.

- ED11, Loss of Control Room Annunciators.

Indications Available:

UA20050C - ANNUNCIATOR SYSTEM LOSS OF POWER

+30 secs RO REFER to Annunciator Response Procedures.

RECOGNIZE Annunciator System Loss of Power alarm and INFORM CRS RO ARP SO23-15-50.A2, Annunciator UA20050C entry required.

DIRECT performance of ARP SO23-15-50.A2, UA20050C - ANNUNCIATOR CRS SYSTEM LOSS OF POWER.

CRS DIRECT testing of all Control Room Annunciator panels.

CRS DIRECT performance of SO23-13-22, Loss of Control Room Annunciators.

CRS/RO DETERMINE loss of all Control Room annunciators has occurred.

INITIATE SO23-13-22, Attachment for Guidelines for Monitoring of Plant CRS Parameters.

DETERMINE activities in progress which could potentially disrupt plant CRS stability.

RECOGNIZE that if annunciators are lost for 15 minutes, an Unusual Event CRS must be declared per Tab D1-2.

INITIATE SO23-13-22, Attachment for Power Loss Determination and CRS Recovery.

Examiner Cue: As long as the Plant Computer System (PCS) is OPERABLE, then Technical Specification LCOs 3.2.1, 3.2.3, 3.2.4, and SR 3.3.7.1 are Not Applicable (N/A).

SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 1 Page 5 of 22 Event

Description:

Loss of Control Room Annunciators Time Position Applicants Actions or Behavior

+5 min CRS EVALUATE Technical Specifications.

  • ACTION E.1 - Within one (1) hour, PERFORM SO23-3-3.6, Attachment for PDIL Alarm Circuit INOPERABLE.

CRS REVIEW additional Technical Specifications as time permits.

CRS VERIFY Bus D5 energized.

DISPATCH an Operator to Panel D5 and VERIFY Breaker 6, Panel D5P4 CRS Supply Breaker, is closed.

M.O. Cue: If directed to check breaker 2D5-06, WAIT 1 minute then REPORT Breaker 2D5-06 is closed.

DIRECT an Operator to CHECK Panel D5P4 Breaker 74, Panel L-040 supply CRS breaker.

M.O. Cue: If directed to check Panel 2D5P4 breaker 74, REPORT 2D5P4 Breaker 74 is in a tripped condition, and no visible signs of distress.

DIRECT Electrical Maintenance to assist in troubleshooting and restoration CRS of loss of annunciators.

M.O. Cue: If Maintenance is directed to investigate Panel 2D5P4, WAIT 1 minute then REPORT no apparent reason for tripped Breaker 74.

Floor Cue: If operator is directed to inspect Panel 2L-040, REPORT no power indicated (all lights extinguished), and no visible sign of distress.

CRS DIRECT a PEO to PERFORM a RECLOSE attempt on D5P4 Breaker 74.

SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 1 Page 6 of 22 Event

Description:

Loss of Control Room Annunciators Time Position Applicants Actions or Behavior M.O. Cue: If directed to close 2D5P4 Breaker 74, WAIT 1 minute, then DELETE ED11 and REPORT closure to Control Room.

CRS/RO RECOGNIZE that annunciator power is restored.

CRS DIRECT testing of all Control Room annunciators.

+10 min TEST all Control Room annunciators and INFORM CRS they are RO/BOP operational.

When annunciator power is restored, or at Lead Evaluators discretion, PROCEED to Events 2 and 3.

SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 2&3 Page 7 of 22 Event

Description:

Main Feedwater Pump Trip / Rapid Power Reduction Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 2.

- FW08B, Main Feedwater Pump (K005/P063) loss of lube oil.

Indications Available:

53B11 - MFWP TURBINE K005 OIL PRESS LO PRETRIP 53B32 - MFWP TURBINE K005 DC OIL PUMP RUNNING 53B33 - MFWP TURBINE K005 OIL PUMP OOS / OC (after standby pump start) 53B41 - MFWP TURBINE K005 OIL LEVEL HI / LO (~15 seconds later)

+30 secs BOP REFER to Annunciator Response Procedures.

RECOGNIZE Main Feedwater Pump loss of lube oil and INFORM the CRS BOP ARP SO23-15-53.B.11 entry required.

DIRECT performance of SO23-15-53.B.11, MFWP TURBINE K005 OIL CRS PRESS LO PRETRIP.

CRS/BOP DISPATCH a PEO to investigate cause of low lube oil pressure.

M.O.Cue: After one (1) minute, REPORT an oil line pipe rupture on Main Feedwater Pump P-063.

BOP VERIFY START of the standby AC Lube Oil Pump.

BOP VERIFY the DC lube oil pump is running.

DETERMINE Main Feedwater Pump will eventually be tripped due to a loss CRS/BOP of lube oil.

CRS DIRECT tripping Main Feedwater Pump P063.

TRIP Main Feedwater Pump P063 trip and INFORM the CRS AOI BOP SO23-13-28 entry required.

DIRECT a Rapid Power Reduction using CEAs and/or boration per CRS SO23-13-28, Rapid Power Reduction.

SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 2&3 Page 8 of 22 Event

Description:

Main Feedwater Pump Trip / Rapid Power Reduction Time Position Applicants Actions or Behavior Examiner Note: The following steps are from SO23-13-28, Rapid Power Reduction.

CRS DIRECT EFAS initiation to restore SG level.

+5 min RO/BOP INITIATE EFAS by depressing all EFAS Actuation pushbuttons once.

BORATE as required using the Alternate Boration Flowpath through RO HV-9247.

BOP ENSURE all available Condensate Pumps running.

RO INSERT CEAs as required.

BOP INITIATE a Manual Runback for Turbine load change.

BOP ENSURE Feedwater Control Valves < 100% open and controlling level.

BOP ENSURE Steam Generator level(s) stable or rising.

BOP ENSURE Low Level Alarm(s) reset.

DEPRESS all EFAS Actuation Pushbuttons a second time to reset the RO/BOP cycling relays.

CONTACT Chemistry and the GOC and inform them of the Rapid Power CRS Reduction.

IMPLEMENT Attachment 8 to determine the amount of boration and CEAs to RO be used to achieve the target power level.

SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 2&3 Page 9 of 22 Event

Description:

Main Feedwater Pump Trip / Rapid Power Reduction Time Position Applicants Actions or Behavior

+ 20 min RO FORCE Pressurizer normal spray flow.

When power level is stable at approximately 70%, or at Lead Evaluators discretion, PROCEED to Event 4.

SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 4 Page 10 of 22 Event

Description:

Loss of Bus 2A04 Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 4.

- ED03A, Bus 2A04 overcurrent trip and lockout.

Indications Available:

63B05 - 2A04 VOLTAGE LO 63B06 - 2B04 VOLTAGE LO 63B25 - 2A04 SUPPLY BREAKER 2A0418 OC

+30 sec RO/BOP REFER to Annunciator Response Procedures.

RECOGNIZE low Bus 2A04 voltage and INFORM the CRS AOI SO23-13-26 RO/BOP entry required.

DIRECT performance of AOI SO23-13-26, Loss of Power to an AC Bus, CRS Attachment 1, Loss of 1E 4 kV Bus.

CRS DIRECT starting of Train B CCW.

BOP PLACE Train B CCW in service.

CRITICAL TASK With loss of flow to the CCW Non-Critical Loop and prior to exceeding RCP STATEMENT operating limits, restore flow to the NCL from any available CCW train.

CRITICAL TASK BOP TRANSFER the CCW Non-Critical Loop to Train B.

BOP TRANSFER Letdown Heat Exchanger to Train B CCW.

CRS DETERMINE that loss of 2A04 is NOT due to fire.

M.O. Cue: When directed to investigate 2A0418 overcurrent, WAIT 3 minutes and REPORT an overcurrent flag on Phase B.

DIRECT performance of SO23-6-9, 6.9 kV, 4 kV and 480 V Bus Feeder CRS Faults.

SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 4 Page 11 of 22 Event

Description:

Loss of Bus 2A04 Time Position Applicants Actions or Behavior DIRECT performance of AOI SO23-13-26, Loss of Power to an AC Bus, CRS Attachment 3, Equipment Actions for Loss of Bus A04.

BOP ENSURE Train B SWC Pump running.

BOP VERIFY 2G002 Maintenance Lockout Switch in LOCKOUT.

Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, DIRECT performance of SO23-3-3.23, Attachment for AC CRS Sources Verification for both Units.

PLACE HS-0210, Makeup Mode Selector Switch to MANUAL and PLACE a RO Caution Tag at the switch to prevent inadvertent dilution.

+5 min CRS EVALUATE Technical Specifications.

  • CONDITION A - One battery or associated control equipment or cabling inoperable.
  • ACTION A.1 - Restore DC electrical power subsystem to OPERABLE status within two (2) hours.

Examiner Note: DNBR may or may not be bypassed.

CRS DIRECT Bypassing Channel A DNBR and LPD trips.

M.O. Cue: When directed, EXECUTE the following remote functions:

RP51 = OPEN (PPS Door Open Annunciator 56B46)

RP52C = BYPASS (Channel A Hi Local Power)

RP52D = BYPASS (Channel A Low DNBR)

Delete RP51 (PPS Door Open Annunciator 56B46)

RO VERIFY the Trip Channel Bypassed Annunciator alarms.

  • 56A29 - PPS CHANNEL 1 TRIP BYPASSED DIRECT setting CEAC 2 INOP Flags in all CPCs by changing each CPC CRS Addressable Constant Point ID 062 to 2.

SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 4 Page 12 of 22 Event

Description:

Loss of Bus 2A04 Time Position Applicants Actions or Behavior CRS DIRECT aligning Charging Pump P191 to Train B.

M.O. Cue: If asked, REPORT Unit 3 Train B Component Cooling Water is operating.

CRS DIRECT initiating Train B CRIS.

BOP INITIATE Train B CRIS.

+15 min BOP ENSURE A-072 or A-073 Dome Air Circulating Fan running.

When Technical Specifications and major Attachment 3 actions have been addressed, or at Lead Evaluators discretion, PROCEED to Events 5, 6, 7, and 8.

SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 5, 6, 7, & 8 Page 13 of 22 Event

Description:

Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Events 5, 6, 7, and 8.

- TU08, Main Turbine trip.

- PG24, Loss of Offsite Power.

- EG08B, Emergency Diesel Generator G-003 fails to start.

- FW25, TDAFW Pump overspeed trip (300 seconds post-trip).

- CVCS LP, Boric Acid Makeup Tank Gravity Feed Valves fail to open.

Indications Available:

Numerous Loss of Offsite Power related alarms

+ 10 secs CRS DIRECT performance of SO23-12-1, Standard Post Trip Actions.

RO VERIFY Reactor Trip:

  • VERIFY Reactor Power lowering and Startup Rate negative.
  • VERIFY maximum of one full length CEA NOT fully inserted.

CRS VERIFY Reactivity Control criteria satisfied.

BOP VERIFY Turbine Trip:

  • HP and LP Stop and Governor Valves closed.
  • VERIFY both Unit Output Breakers open.

CRS INITIATE Administrative Actions:

  • INITIATE Attachment 4, Worksheet.
  • INITIATE Attachment 5, Administrative Actions.

BOP DETERMINE Vital Auxiliaries criteria NOT satisfied:

  • DETERMINE both 1E 4 kV Buses A04 and A06 deenergized.
  • [RNO] PLACE Train B EDG in Maintenance Lockout.
  • [RNO] INITIATE Attachment 2, Diesel Generator Failure Follow-Up Actions for Bus 2A06.

SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 5, 6, 7, & 8 Page 14 of 22 Event

Description:

Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time Position Applicants Actions or Behavior

  • DETERMINE both 1E 480 V Buses B04 and B06 deenergized.
  • VERIFY all 1E DC Buses energized.
  • DETERMINE all Non-1E 4 kV Buses deenergized.
  • [RNO] ENSURE MSIVs closed.
  • [RNO] OPERATE ADVs to maintain 1000 psia.
  • DETERMINE CCW Train NOT operating and NOT aligned to Non-Critical Loop and Letdown Heat Exchanger.

M.O. Cue: If directed to investigate 2G003, WAIT 3 minutes then REPORT EDG governor is disconnected.

Examiner Note: Depending on the speed at which SPTAs are performed and initial conditions at the time of trip, RCS Inventory and RCS Pressure Control may or may not be satisfied.

RO VERIFY RCS Inventory Control criteria satisfied:

  • VERIFY PZR level between 10% and 70% and trending to between 30%

and 60%.

  • VERIFY Core Exit Saturation Margin 20°F:

RO VERIFY RCS Pressure Control criteria satisfied:

  • VERIFY PZR pressure (WR and NR) between 1740 PSIA and 2380 PSIA and controlled AND trending between 2025 PSIA and 2275 PSIA.

RO DETERMINE Core Heat Removal criteria is NOT satisfied:

  • DETERMINE no RCPs are operating.
  • VERIFY Core Exit Saturation Margin 20°F.

SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 5, 6, 7, & 8 Page 15 of 22 Event

Description:

Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time Position Applicants Actions or Behavior BOP DETERMINE RCS Heat Removal criteria NOT satisfied:

  • VERIFY both SGs level > 21% NR.
  • VERIFY both SGs level < 80% NR.
  • [RNO] ENSURE EFAS actuated.
  • VERIFY heat removal adequate:
  • Tcold trending to between 545°F and 555°F.
  • SG pressures approximately 1000 PSIA.

Examiner Note: Steam Driven Auxiliary Feedwater Pump P140 will trip on overspeed 300 seconds after start.

RECOGNIZE Aux Feedwater Pump P-140 has tripped by observing alarm BOP 52A53 - TURBINE AUX FW PUMP GOVERNOR OVERSPEED / OOS.

M.O. Cue: When contacted to investigate the status of 2P140, WAIT 3 minutes then REPORT that the linkage is in the trip position.

M.O. Cue: When directed to reset the trip linkage for 2P140, WAIT 3 minutes and REPORT that a linkage pin is broken.

RO VERIFY Containment Isolation criteria satisfied:

  • VERIFY Containment pressure < 1.5 PSIG.
  • DETERMINE some Containment Area Radiation Monitors energized and NOT alarming or trending to alarm.
  • DETERMINE some Secondary Plant Radiation Monitors energized and NOT alarming or trending to alarm.

RO VERIFY Containment Temperature and Pressure criteria satisfied:

  • VERIFY Containment average temperature < 120°F.
  • VERIFY Containment pressure < 1.5 PSIG.

SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 5, 6, 7, & 8 Page 16 of 22 Event

Description:

Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time Position Applicants Actions or Behavior

+15 min CRS DIAGNOSE Event in Progress:

  • DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.
  • [RNO] COMPLETE Attachment 1, Recovery Diagnostics.
  • [RNO] DIAGNOSE Loss of Feedwater and Station Blackout.
  • [RNO] DETERMINE all RCPs stopped.
  • DIRECT initiating Steps 12 through 15.

BOP INITIATE Steps 12 through 15.

M.O. Cue: If SCE GCC is contacted for grid status, REPORT that cause of grid loss is unknown and field crews are investigating. 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> estimate on time to restore.

M.O. Cue: If Unit 3 status is requested, REPORT that Bus 3A06 is energized from EDG 3G003 and Bus 3A04 is energized from EDG 3G002.

CRS DIRECT performance of SO23-12-9, Functional Recovery.

  • RECORD time of EOI entry __________.

M.O. Cue: When SO23-12-9 is initiated, CALL as SDG&E GCC and REPORT that SONGS Switchyard appears to have several faults and will not be available until a crew can be dispatched to determine the problem. 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> estimate on time to restore.

M.O. Cue: If asked, EXECUTE remote function ED81 and transfer Q0612 Instrument Bus #2 to Emergency.

CRS VERIFY Functional Recovery diagnosis:

  • INITIATE SO23-12-10, Safety Function Status Checks.
  • INITIATE Foldout Page.
  • DIRECT performance of FS-3, Monitor Natural Circulation.
  • DIRECT performance of SO23-12-11, Attachment 19, Non-1E DC Load Reduction.

SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 5, 6, 7, & 8 Page 17 of 22 Event

Description:

Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time Position Applicants Actions or Behavior

  • DIRECT performance of SO23-12-11, Attachment 20, Class 1E Battery Load Reduction.
  • DIRECT performance of FS-18, Secondary Plant Protection.
  • DIRECT performance of SO23-12-11, Attachment 24, Supply 1E 4 kV Bus with Opposite Unit Diesel.
  • DIRECT performance of SO23-12-11, Attachment 6, Diesel Generator Failure Follow-up Actions.
  • DIRECT performance of SO23-12-11, Attachment 8, Restoration of Offsite Power.
  • DIRECT Chemistry to sample both SGs for radioactivity and boron.

M.O. Cue: If directed to sample SGs, WAIT 5 minutes and REPORT that E088 and E089 sample lines were frisked, and both have activity near background. If the SG sample valves are closed, REPORT that you are unable to establish sample flow.

M.O. Cue: When directed to initiate Non-1E DC Load Reduction, ACKNOWLEDGE and STATE you will report when complete.

M.O. Cue: When directed to initiate Class 1E Battery Load Reduction, ACKNOWLEDGE and STATE you will report when complete.

Examiner Note: The following steps are from SO23-12-9, Functional Recovery.

CRS INITIATE Administrative Actions.

CRS DETERMINE ESF actuation not required.

CRS EVALUATE Immediate Safety Function Recovery Actions.

INITIATE Attachment FR-5, Recovery-Heat Removal Success Path HR-1, CRS Step 4.

SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 5, 6, 7, & 8 Page 18 of 22 Event

Description:

Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time Position Applicants Actions or Behavior Examiner Note: The following steps are from Attachment 24, Supplying 1E 4 kV Bus with Opposite Unit Diesel. Attachment FR-5, Recovery-Heat Removal Success steps are addressed later in the scenario.

DIRECT performance of SO23-12-11, Attachment 24, Supplying 1E 4 kV Bus CRS with Opposite Unit Diesel.

CRS DETERMINE Train B is available.

OBTAIN approval of Shift Manager to cross connect Train B using CRS 10 CFR 50.54(x) on both Units to supply 1E 4 kV Bus 2A06 with the opposite unit Diesel Generator.

REQUEST SM initiates NRC notification within one hour regarding actions CRS/BOP per this attachment.

NOTIFY opposite Unit SRO that automatic sequencing of ESF loads onto CRS/BOP opposite Unit 1E 4 kV Bus 3A06 will be blocked.

BOP VERIFY Bus 3A06 energized by 3G003 Diesel Generator.

ENSURE 1E 4 kV Bus Tie breaker AUTO/MANUAL transfer switches BOP selected to MANUAL.

BOP ENSURE 1E 4 kV Bus Tie breakers open.

  • 2A0619 and 3A0603.

BOP ENSURE 2G003 Diesel Generator selected to MAINTENANCE LOCKOUT.

DIRECT performance of Train B Diesel Generator Cross-Tie Permissive CRS switch alignment on 50' Elevation.

CONTACT the PPEO and INITIATE Unit 2 Train B Diesel Generator BOP Cross-Tie Permissive switch alignment on 50' Elevation.

SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 5, 6, 7, & 8 Page 19 of 22 Event

Description:

Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time Position Applicants Actions or Behavior

  • VERIFY feeder faults NOT indicated by relay flags on:
  • 2A0616 - Unit Aux Transformer
  • 2A0618 - Reserve Aux Transformer
  • 2A0619 - 2A06 Bus Tie
  • 2A0613 - 2G003 EDG M.O. Cue: When asked, REPORT no feeder faults on breakers.

DIRECT the PPEO to SELECT both Unit 2 Train B Diesel Generator BOP Cross-Tie Permissive switches on Fire Isolation Panel 2L-413 to 50.54X.

  • 2HS-5054XA2 and 2HS-5054XB2 M.O. Cue: When directed, PERFORM remote functions EG62A and EG62B and REPORT that the Unit 2 50.54X switches have been aligned.

CONTACT the PPEO and INITIATE Unit 3 Train B Diesel Generator BOP Cross-Tie Permissive switch alignment on 50' Elevation.

  • VERIFY feeder faults NOT indicated by relay flags on:
  • 3A0603 - 3A06 Bus Tie M.O. Cue: When asked, REPORT no feeder faults on breaker.

DIRECT the PPEO to SELECT both Unit 3 Train B Diesel Generator BOP Cross-Tie Permissive switches on Fire Isolation Panel 3L-413 to 50.54X.

  • 3HS-5054XA2 and 3HS-5054XB2 M.O. Cue: When directed, PERFORM remote functions EG62C and EG62D and REPORT that the Unit 3 50.54X switches have been aligned.

BOP VERIFY 3G003 Diesel Generator loading less than 3.4 MW.

BOP VERIFY Bus 2A06 NOT energized.

BOP VERIFY Unit 2 overcurrent/ground alarms reset.

SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 5, 6, 7, & 8 Page 20 of 22 Event

Description:

Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time Position Applicants Actions or Behavior

  • 63C15 - 2A06 SUPPLY BKR 2A0616 OC
  • 63C25 - 2A06 SUPPLY BKR 2A0618 OC BOP VERIFY 1E DC Bus voltages 2D2 and 3D2 greater than 108 VDC.

M.O. Cue: When asked, REPORT 3D2 voltage at 129 VDC.

BOP ESTABLISH final Train B configuration.

BOP ENSURE 1E 4 kV Bus 2A06 supply breakers open.

  • 2A0616 - Unit Aux Transformer
  • 2A0618 - Reserve Aux Transformer
  • 2A0613 - 2G003 EDG BOP ENSURE 1E 4 kV Bus A06 tie breakers open.
  • 2A0619 - 2A06 Bus Tie
  • 3A0603 - 3A06 Bus Tie BOP ENSURE 1E 4 kV Bus 2A06 load breakers open.
  • Emergency Chillers
  • SWC Pumps VERIFY Train B Diesel Generator Cross-Tie Permissive Switches on both BOP Units are in the 50.54X position.

BOP CLOSE Unit 3 Bus Tie breaker 3A0603.

SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 5, 6, 7, & 8 Page 21 of 22 Event

Description:

Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time Position Applicants Actions or Behavior BOP VERIFY Unit 3 Diesel Generator 3G003 output breaker remains closed.

With a loss of 1E power, energize at least one 4 kV and the associated 480 VAC CRITICAL TASK 1E Bus before DC Bus D2 voltage drops to 107.3 VDC and DC Bus D4 drops to STATEMENT 106.5 VDC.

CRITICAL TASK BOP CLOSE Unit 2 Bus Tie breaker 2A0619.

BOP VERIFY Unit 2 1E buses 2A06 and 2B06 energized.

BOP START CCW Pump P026 on Train B.

RO VERIFY Charging Pump P192 starts on Train B.

RO VERIFY Saltwater Cooling Pump starts on Train B.

Examiner Note: The following steps are from SO23-12-9, Functional Recovery, Attachment FR-5, Recovery-Heat Removal Success.

BOP DETERMINE AFW NOT operating.

BOP DETERMINE TDAFW Pump tripped on overspeed.

BOP VERIFY AFW Pump P504 available.

BOP CLOSE AFW Pump P504 Discharge Valves.

  • HV-4712 and HV-4762.

BOP START AFW Pump P504.

Examiner Note: Throttling of Auxiliary Feedwater flow may or may not be required depending upon Steam Generator level.

SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 2 Event # 5, 6, 7, & 8 Page 22 of 22 Event

Description:

Loss of Offsite Power / EDG Fails to Start / TDAFW Pump Trip / Gravity Feed Valves Fail to Open Time Position Applicants Actions or Behavior OVERRIDE and OPEN AFW Pump P504 Discharge Bypass Valve HV-4762 BOP to 35% open.

  • [RNO] THROTTLE AFW Pump P-504 Discharge Valve HV-4712 to maintain flow between 130 GPM and 150 GPM.

M.O. Cue: If necessary, EXECUTE the following remote functions as directed by the Control Room:

- FW86, P504 Manual Valve HV-4712.

- FW104, P140 Discharge Valve MU122.

- FW105A, P141 Discharge Valve MU127.

- FW102, P504 Discharge Valve MU533.

CRITICAL TASK Restore feedwater flow to at least one Steam Generator prior to complete loss STATEMENT of secondary inventory in both Steam Generators.

CRITICAL THROTTLE HV-4712 to maintain AFW flow between 130 and 150 GPM and TASK BOP MAINTAIN reduced AFW flow for 5 minutes.

BOP RAISE total AFW flow to greater than 400 gpm.

Floor Cue: if necessary, REPORT as Shift Manager to continue actions in SO23-12-9, Functional Recovery.

Examiner Note: The following steps are from SO23-12-9, Functional Recovery, Step 6c.

CRS DIRECT initiation of boration greater than 40 GPM.

RO COMMENCE boration of the RCS using BAMU Tank Gravity Feed Valves.

DETERMINE BAMU Tank Gravity Feed Valves will NOT open and INITIATE

+30 min RO boration of the RCS using LV-0227C, Refueling Water Storage Tank to Charging Pump Gravity Feed Valve.

When power is restored to Bus 2A06, feedwater flow is restored, and a boration is commenced, or at Lead Evaluators discretion, TERMINATE the scenario.

SONGS Oct 2009 NRC Sim Scenario #2 Rev 0.doc

Appendix D Scenario Outline Form ES-D-1 Facility: SONGS 2 and 3 Scenario No.: 3 Op Test No.: October 2009 NRC Examiners: Operators:

Initial Conditions:

  • Train A Component Cooling Water Pump (P-025) in service.
  • Train A Low Pressure Safety Injection Pump (P-015) OOS for oil change.
  • Fire Computer is OOS.

Turnover: Dilution and power ascension in progress at 10% per hour.

Critical Tasks:

  • Establish Reactivity Control (Two Full Length CEAs Not Fully Inserted & No SIAS).
  • Manually Initiate Main Steam Isolation Signal (Auto Actuation failure).

Event No. Malf. No. Event Type* Event Description 1 R (RO) Dilution and power ascension at 10% per hour.

+15 min N (BOP, CRS) 2 RC09A TS (CRS) Reactor Coolant Pump (P-002) Speed Sensor (SE-0143-1) failure.

+25 min 3 CV16B I (RO, CRS) Volume Control Tank Level Transmitter (LT-0227) fails low.

+35 min 4 ED06D C (RO, BOP, CRS) Overcurrent trip of Feeder Breaker to 1E 480 Volt Bus 2B04.

+50 min TS (CRS) 5 FW LP C (BOP, CRS) Main Feedwater Pump trip.

+55 min RX LP Primary Side Reactor Trip pushbuttons disabled.

6 MS04B M (RO, BOP, CRS) Excess Steam Demand Event downstream of Main Steam Isolation

+60 min Valves (300 second ramp).

7 RD1402 C (RO) Two CEAs fail to insert on the trip. Emergency boration via gravity

+60 min RD1502 feed due to loss of 1E Bus 2B04.

8 MSIS LP I (BOP) Main Steam Isolation Signal fails to actuate; manual actuation

+65 min required.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (TS)Technical Specifications SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc

Appendix D Scenario Outline Form ES-D-1 SCENARIO

SUMMARY

NRC #3 The crew will assume the watch and resume a dilution and power ascension per Operating Instruction (OI) SO23-5-1.7, Power Operations at 10% per hour.

The next event is a Reactor Coolant Pump speed sensor failure. The crew will respond per the Annunciator Response Procedures (ARP) and place the appropriate Reactor Protection System trips in Bypass per Abnormal Operating Instruction (AOI) SO23-13-18, Reactor Protection System Failure/Loss of Vital Bus and Operating Instruction (OI) SO23-3-2.12, Reactor Protective System Operation. The CRS will evaluate Technical Specifications.

When Technical Specifications have been addressed, a Volume Control Tank (VCT) level transmitter fails low and transfers Charging Pump suction to the Refueling Water Storage Tank. The crew will align LV-0227B, VCT Outlet Valve and refer to Operating Instruction (OI) SO23-3-2.1, CVCS Operations and/or SO23-3-2.2, Makeup Operations.

The next event is the overcurrent trip of the feeder breaker to 1E 480 Volt Bus 2B04. The crew will respond per AOI SO23-13-26, Loss of Power to an AC Bus. Crew actions include restoring Charging flow as required and placing the Train A Emergency Diesel Generator in Maintenance Lockout. The CRS will evaluate Technical Specifications.

During the next event, the running of Main Feedwater Pump will trip. The crew will determine that a Reactor and Turbine trip are required. The Primary Side Reactor Trip pushbuttons are disabled and the BOP will trip the Reactor.

When the Reactor and Turbine are tripped, an Excess Steam Demand Event (ESDE) downstream of the Main Steam Isolation Valves will occur. The crew should determine that an ESDE is occurring and manually trip the Reactor and Turbine. Entry into Emergency Operating Instruction (EOI) SO23-12-1, Standard Post Trip Actions is required. A transition will then be made to EOI SO23-12-5, Excess Steam Demand Event. Two (2) Control Element Assemblies will fail to insert on the trip and an emergency boration using the Gravity Feed Valves is required. Additionally, a manual Main Steam Isolation Signal must be generated.

This scenario is terminated when the Main Steam Isolation Valves are closed and Reactor Coolant System temperature control is restored using the Atmospheric Dump Valves.

Risk Significance:

  • Risk important components out of service: Low Pressure Safety Injection Pump (P-015)
  • Failure of risk important system prior to trip: Loss of 1E 480 V Bus 2B04
  • Risk significant core damage sequence: ESDE with MSIS failure
  • Risk significant operator actions: Initiate Emergency Boration Manually Initiate MSIS Establish RCS Temperature Control SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc

Scenario Event Description NRC Scenario #3 SONGS 2009 Facility NRC Initial License Examination Simulator Scenario Setup Machine Operator: EXECUTE IC #223 and NRC Scenario #3 SETUP file to align components.

HANG Control Board Tags on P-015.

CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario born concentration.

VERIFY CVCS PMW Batch Counter indicates ~990 gallons.

VERIFY both Pressurizer Spray Valves in AUTO.

ENSURE Main Turbine Load is set for 1.9 MWe/min.

VERIFY 2FV-9253 is in AUTO / CLOSE when stopping the dilution for turnover.

PLACE procedures in progress on the RO desk:

- Copy of SO32-5-1.7, Power Operations open to Section 6.3, Turbine Load Change Using Setpoint Adjustment.

- MARKED UP copy of SO23-5-1.7, Attachment 9.

- MARKED UP copy of SO23-3-2.2 with Steps 6.5.1 through 6.5.8 checked off.

- Copy of SO23-3-1.10 open to Section 6.3, Forcing Pressurizer Sprays.

- Copy of SO23-10-1, Turbine Startup and Normal Operation, Attachment 6, MSR Warmup.

VERIFY MOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board.

If Group Position(s) is (are) not correct, MOVE CEAs and then RETURN CEAs to Shift Turnover Sheet position (Group 6 @ 125 / PLCEAs @ 115).

Significant Control Room Annunciators in Alarm:

57A51 - SI / ECW TRAIN A INOPERABLE 56A30/40/50/60 - LOSS OF LOAD CHANNEL 1/2/3/4 TRIP DISABLED 53A03 - MFWP TURBINE K006 TRIP 53B23 - CONDENSATE FLOW BALANCE TROUBLE SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 1 Page 4 of 17 Event

Description:

Dilution and Power Ascension at 10% per hour Time Position Applicants Actions or Behavior Machine Operator: When Shift Turnover is complete, PLACE Simulator in RUN.

DIRECT performance of SO23-5-1.7, Power Operations, SO23-3-2.2,

+1 min CRS Makeup Operations, and SO23-10-1, Turbine Startup and Normal Operation.

RO VERIFY Batch Counter and Makeup Integrator settings.

RO PERFORM dilution valve alignment.

  • VERIFY FIC-0210X in AUTO at ~16.5 gpm.
  • PLACE HS-0210 in DILUTE.

RO VERIFY Tcold changing as dilution progresses.

RO ADJUST CEAs as required for ASI control.

MAINTAIN Tcold within required band by raising Main Generator load using

+15 min BOP HS-2210, Main Turbine Speed Load Control to RAISE or as outlined in SO23-5-1.7, Section 6.3.

Floor Cue: If asked, REPORT as Shift Manager that the 2nd Main Feedwater Pump will be started prior to transferring power to the Unit Auxiliary Transformer.

When power has been raised 3 to 5%, or at Lead Evaluators discretion, PROCEED to Event 2.

SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 2 Page 5 of 17 Event

Description:

Reactor Coolant Pump Speed Sensor Failure Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 2.

- RC09A, Reactor Coolant Pump (P-002) Speed Sensor (SE-0143-1) failure.

Indications Available:

56A04 - DNBR LO CHANNEL TRIP 56A14 - DNBR LO RPS PRETRIP 56B06 - PPS CHANNEL 1 TROUBLE 56C01 - CPC CHANNEL 1 SENSOR FAILURE

+30 sec RO/BOP REFER to Annunciator Response Procedures.

RECOGNIZE CPC Channel 1 sensor failure and INFORM the CRS RO SO23-13-18, Reactor Protection System Failure entry required.

DIRECT performance of SO23-13-18, Reactor Protection System Failure /

CRS Loss of Vital Bus.

REFER to SO23-3-2.13, Core Protection / Control Element Assembly RO Calculator Operation and DETERMINE Reactor Coolant Pump P-002 has a failed speed sensor.

REFER to Attachment 5 and DETERMINE Functional Unit affected is CRS Reactor Coolant Pump P-002 Speed.

PLACE the affected Functional Unit in BYPASS per SO23-3-2.12, Section for RO Bypass Operation of Trip Channels.

RO VERIFY that the same bistable is not in BYPASS on any other Channel.

M.O. Cue: When directed, EXECUTE the following Remote Functions:

RP51 = OPEN (PPS Door Open Annunciator 56B46)

RP52C = BYPASS (High LPD Channel A)

RP52D = BYPASS (Low DNBR Channel A)

Delete RP51 (PPS Door Open Annunciator 56B46)

RO VERIFY the Trip Channel Bypassed Annunciator alarm.

  • 56A29 - PPS CHANNEL 1 TRIP BYPASSED.

SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 2 Page 6 of 17 Event

Description:

Reactor Coolant Pump Speed Sensor Failure Time Position Applicants Actions or Behavior CONFIRM failure does NOT affect RPS/ESFAS Matrix Logic, RPS/ESFAS CRS Initiation Logic, RTCBs, RPS/ESFAS Manual Trip, or ESFAS Actuation Logic.

CRS CONFIRM failure does NOT affect the Feedwater Digital Control System.

+10 min CRS EVALUATE Technical Specifications.

  • CONDITION A - One or more Functions with one automatic RPS trip channel inoperable.
  • ACTION A.1 - Place Channel in bypass or trip within one (1) hour.

When the RPS Channel 1 is bypassed, or at Lead Evaluators discretion, PROCEED to Event 3.

SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 3 Page 7 of 17 Event

Description:

VCT Level Transmitter Fails Low Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 3.

CV16B, LT-0227, VCT Level Transmitter fails low.

Indications Available:

58A05 - VCT LEVEL LO/LO VCT Level Indicator LI-0227A lowering (on Plant Computer System)

VCT Outlet Valve LC-0227B closes RWST to Charging Pump Suction Valve LV-0227C opens

+1 min RO REFER to Annunciator Response Procedures.

DETERMINE that VCT suction has shifted from VCT to RWST and INFORM RO CRS that ARP SO23-15.58.A05 entry required.

DIRECT performance of CRS that ARP SO23-15.58.A, Annunciator 58A05 -

CRS VCT LEVEL LO / LO.

RO CHECK VCT Level indicator LI-0226 and determine that level is normal.

RO RECOGNIZE that VCT level indicator LI-0227 has failed low.

RO PLACE LV-0227B, VCT Outlet Valve in MANUAL and OPEN.

BOP ADJUST Turbine load as necessary to restore TCOLD per SO23-5-1.7.

DIRECT performance of SO23-3-2.2, Makeup Operations to ensure proper CRS CVCS alignment is achieved.

+10 min CRS REQUEST I&C assistance.

When plant conditions are stable, or at Lead Evaluators discretion, PROCEED to Event 4.

SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 4 Page 8 of 17 Event

Description:

Loss of Bus 2B04 Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 4.

- ED06D, Loss of Bus 2B04.

Indications Available:

63B06 - 2B04 VOLTAGE LO 63B55 - LOAD CENTER XFMR FDR 2A0420 OC 63A52 - 2D1 CHARGER TROUBLE 63A54 - 2D3 CHARGER TROUBLE Numerous Train A ECCS INOPERABLE alarms

+30 secs RO/BOP REFER to Annunciator Response Procedures.

RECOGNIZE low 2B04 Bus voltage and INFORM the CRS AOI SO23-13-26 RO/BOP entry required.

CRS DIRECT performance of AOI SO23-13-26, Loss of Power to an AC Bus.

RO START Charging Pump P-192 as required.

DISPATCH an operator to VERIFY loss of the 1E 480 V Bus is NOT due to a CRS fire in the 1E Switchgear Room.

RO/BOP DETERMINE overcurrent annunciators are alarming on Bus 2B04.

DIRECT initiation of SO23-6-9, 6.9 kV, 4 kV and 480V Bus and Feeder CRS Faults to return Bus 2B04 to service.

CRS DIRECT initiation of Equipment Actions for Loss of the 1E 4 kV Bus 2B04.

+5 min BOP PLACE G002 Diesel Generator in MAINTENANCE LOCKOUT.

Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, DIRECT performance of SO23-3-3.23, Attachment for AC CRS Sources Verification for both Units.

SELECT HS-0210, Makeup Mode Selector Switch to MANUAL and PLACE a RO Caution Tag at the switch to prevent inadvertent dilution.

SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 4 Page 9 of 17 Event

Description:

Loss of Bus 2B04 Time Position Applicants Actions or Behavior CRS EVALUATE Technical Specifications.

  • CONDITION A - One battery or associated control equipment or cabling INOPERABLE.
  • ACTION A.1 - Restore DC electrical power subsystem to OPERABLE status within two hours.

CRS VERIFY Channel A DNBR and LPD trips bypassed.

RO VERIFY the Trip Channel Bypassed Annunciator alarms.

  • 56A29 - PPS CHANNEL 1 TRIP BYPASSED DIRECT setting CEAC 2 INOP Flags in all CPCs by changing each CPC CRS Addressable Constant Point ID 062 to 2.

CRS DIRECT aligning Charging Pump P191 to Train B.

M.O. Cue: If asked, REPORT Unit 3 Train B Component Cooling Water is operating.

RO/BOP START a Train B Containment Air Dome Circulator.

CRS DIRECT initiating Train B CRIS.

+15 min BOP INITIATE Train B CRIS.

When Technical Specifications have been addressed, or at Lead Evaluators discretion, PROCEED to Event 5.

SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 5 Page 10 of 17 Event

Description:

Main Feedwater Pump Trip Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 5.

- FW LP, Main Feedwater Pump trip.

Indications Available:

53B03 - MFWP TURBINE K005 TRIP

+10 sec BOP REFER to Annunciator Response Procedures.

BOP DETERMINE only available Main Feedwater Pump has tripped.

CRS DIRECT a Reactor and Turbine trip.

Examiner Note: The Primary Side Reactor Trip pushbuttons have been disabled and the Reactor will be tripped by the BOP.

+1 min BOP Manually TRIP the Reactor and Turbine.

When Reactor has been tripped, or at Lead Evaluators discretion, PROCEED to Events 6, 7, and 8.

SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 6, 7, & 8 Page 11 of 17 Event

Description:

Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Events 6, 7, and 8.

- MS04B, ESDE on SG E089 downstream of MSIV @ 30% on 300 second ramp.

- MSIS LP, Main Steam Isolation Signal fails to actuate.

- RD1402 & RD1502, Control Element Assemblies #14 & #15 fail to insert.

Indications Available:

Normal post-trip alarms Steam Generator E089 pressure lowering RCS temperature lowering CRS DIRECT performance of SO23-12-1, Standard Post Trip Actions.

RO VERIFY Reactor Trip:

  • VERIFY Reactor Power lowering and Startup Rate negative.
  • DETERMINE two (2) full length CEAs NOT fully inserted.

With failure of 2 or more Full Length CEAs to fully insert, perform an CRITICAL TASK emergency boration (or some other alignment which adds boric acid from STATEMENT either the BAMU Tanks or RWST at 40 gpm or more).

CRITICAL TASK RO * [RNO] COMMENCE emergency boration at greater than 40 gpm.

CRS VERIFY Reactivity Control criteria satisfied.

BOP VERIFY Turbine Trip:

  • HP and LP Stop and Governor Valves closed.
  • VERIFY both Unit Output Breakers open.

CRS INITIATE Administrative Actions:

  • INITIATE Attachment 4, Worksheet.

SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 6, 7, & 8 Page 12 of 17 Event

Description:

Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time Position Applicants Actions or Behavior

  • INITIATE Attachment 5, Administrative Actions.

BOP VERIFY Vital Auxiliaries criteria satisfied:

  • VERIFY both 1E 4 kV Buses A04 and A06 energized.
  • DETERMINE one 1E 480 V Bus B04 deenergized.
  • [RNO] INITIATE Attachment 2, Diesel Generator Failure Follow-Up Actions for Bus 2B04.
  • VERIFY all 1E DC Buses energized.
  • VERIFY all Non-1E 4 kV Buses energized.
  • VERIFY one CCW Train operating AND aligned to Non-Critical Loop and Letdown Heat Exchanger.

M.O. Cue: If directed to check Main Steam Safety Valve status, REPORT that all Safety Valves appear to be seated, with no steam coming from the MSIV roof, however, the Turbine Building is filling with steam.

RO DETERMINE RCS Inventory Control criteria NOT satisfied:

  • DETERMINE PZR level NOT between 10% and 70% AND NOT trending to between 30% and 60%.
  • [RNO] DETERMINE PZR Level Control System is NOT restoring PZR level.
  • VERIFY Core Exit Saturation Margin 20°F:

RO DETERMINE RCS Pressure Control criteria is NOT satisfied:

  • DETERMINE Pressurizer pressure is less than 1740 PSIA and lowering.
  • [RNO] DETERMINE PZR Pressure Control System is NOT restoring PZR pressure.
  • [RNO] ENSURE Normal and Aux Spray valves closed.
  • [RNO] ENSURE SIAS, CCAS, and CRIS actuated.
  • [RNO] If PZR pressure is < 1430 PSIA, then ENSURE at least one RCP in each loop stopped.

RO * [RNO] STOP one RCP in each loop.

SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 6, 7, & 8 Page 13 of 17 Event

Description:

Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time Position Applicants Actions or Behavior

  • [RNO] If RCP NPSH requirements NOT satisfied, then ENSURE all RCPs stopped.

RO VERIFY Core Heat Removal criteria satisfied:

  • VERIFY at least one RCP operating.
  • VERIFY core loop T is less than 10ºF.
  • VERIFY Core Exit Saturation Margin 20°F.

BOP DETERMINE RCS Heat Removal criteria NOT satisfied:

  • DETERMINE TC less than 545°F and NOT controlled.
  • DETERMINE heat removal NOT adequate:
  • [RNO] Tcold less than 545°F.
  • [RNO] ENSURE SBCS valves closed.
  • [RNO] ENSURE ADVs closed.
  • [RNO] ENSURE SG Blowdown valves closed.
  • E-088 - HV-4054 E-089 - HV-4053
  • [RNO] ENSURE Main Steam to Reheater Valves closed:

HV-2703 or HV-2704, HV-2721, HV-2751.

  • DETERMINE SG pressures < 740 PSIA.
  • DETERMINE MSIS NOT actuated.

Actions are taken to isolate the SGs prior to either SG blowing dry. These CRITICAL TASK actions may include either manual actuation of the MSIS signal, or manual STATEMENT closure of MSIS actuated components.

CRITICAL TASK BOP Manually INITIATE MSIS.

SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 6, 7, & 8 Page 14 of 17 Event

Description:

Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time Position Applicants Actions or Behavior RO VERIFY Containment Isolation criteria satisfied:

  • VERIFY Containment pressure <1.5 PSIG.
  • VERIFY Containment Area Radiation Monitors energized AND NOT alarming or trending to alarm.
  • VERIFY Secondary Plant Radiation Monitors energized AND NOT alarming or trending to alarm.

RO VERIFY Containment Temperature and Pressure criteria satisfied:

  • VERIFY Containment average temperature < 120°F.
  • VERIFY Containment pressure < 1.5 PSIG.

+15 min CRS DIAGNOSE event in progress:

  • DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.
  • [RNO] COMPLETE Attachment 1, Recovery Diagnostics.
  • [RNO] DIAGNOSE event as ESDE outside Containment.
  • [RNO] ENSURE at least one RCP stopped in each loop.
  • DIRECT initiating Steps 12 through 15.

BOP INITIATE Steps 12 through 15.

CRS DIRECT performance of EOI SO23-12-5, Excess Steam Demand Event.

  • RECORD time of EOI entry __________.

CRS VERIFY ESDE diagnosis:

  • INITIATE SO23-12-10, Safety Function Status Checks.
  • INITIATE Foldout Page.
  • DIRECT performance of FS-7, Verify SI Throttle/Stop Criteria.
  • DIRECT performance of Attachment 22, Non-Qualified Loads Restoration.
  • DIRECT performance of FS-30, Stabilize RCS Temperature.

SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 6, 7, & 8 Page 15 of 17 Event

Description:

Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time Position Applicants Actions or Behavior

  • DIRECT performance of Attachment 28, Isolation of SG with ESDE.
  • VERIFY ESDE diagnosis using Figure 1, Break Identification Chart.

M.O. Cue: If directed to sample SGs, WAIT 10 minutes and then REPORT that E088 and E089 both have activity near background, and normal boron levels. If the SG sample valves are closed, REPORT that you are unable to establish sample flow.

CRS INITIATE Administrative Actions:

  • NOTIFY Shift Manger/Operations Leader of entry into SO23-12-5, Excess Steam Demand Event.
  • IMPLEMENT Placekeeper.

RO VERIFY ESF actuation.

  • VERIFY SIAS actuation required.
  • PZR pressure less than SIAS setpoint.
  • ENSURE the following actuated:
  • SIAS / CCAS / CRIS /MSIS CRS RECORD time of SIAS __________.

BOP STOP Train B EDG (SIAS Override STOP).

PERFORM EOI SO23-12-11, Attachment 22, Non-Qualified Load BOP Restoration.

M.O. Cue: When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored non-qualified loads.

SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 6, 7, & 8 Page 16 of 17 Event

Description:

Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time Position Applicants Actions or Behavior BOP VERIFY MSIS actuation required and ENSURE MSIS actuated.

  • SG pressure < 740 PSIA.

RO DETERMINE CIAS actuation NOT required.

RO VERIFY SIAS actuated.

RO ESTABLISH Optimum SI Alignment:

  • ESTABLISH two train operation:
  • All available Charging Pumps operating (P192).
  • One HPSI and one LPSI per Train B operating.
  • Train B Cold Leg flow paths aligned.
  • VERIFY SI flow required:
  • SI flow indicated OR RCS pressure >1250 psia.

OR

  • VERIFY FS-7, Verify SI Throttle/Stop criteria satisfied.

BOP DETERMINE MSIVs and MSIV Bypasses CLOSED.

CRS PREVENT Pressurize Thermal Shock.

  • DIRECT performance of FS-30, Stabilize RCS Temperature.
  • DIRECT performance of VERIFY FS-7, Verify SI Throttle/Stop Criteria.

VERIFY RCP NPSH requirements of EOI SO23-12-11, RO Attachment 29.

CRS VERIFY ESDE isolated.

BOP

BOP

RO

  • VERIFY RCS Tcold in each loop rising.

SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 3 Event # 6, 7, & 8 Page 17 of 17 Event

Description:

Excess Steam Demand Event / Two CEAs Fail to Insert / MSIS Fails to Actuate Time Position Applicants Actions or Behavior BOP VERIFY least affected SG level > 22% narrow range.

+30 min BOP OPERATE ADV to stabilize RCS temperature.

When ESDE is verified isolated, TERMINATE the scenario.

SONGS Oct 2009 NRC Sim Scenario #3 Rev 0.doc

Appendix D Scenario Outline Form ES-D-1 Facility: SONGS 2 and 3 Scenario No.: 4 Op Test No.: October 2009 NRC Examiners: Operators:

Initial Conditions:

  • Train B Component Cooling Water Pump (P-026) in service.
  • Channel X Pressurizer Level and Pressure Control in service.
  • Fire Computer is OOS.

Turnover: Power increase in progress to ~ 2% power.

Critical Tasks:

  • Restore Component Cooling Water flow due to Train B leakage.

Event No. Malf. No. Event Type* Event Description 1 R (RO) Rod withdrawal and power increase in progress to ~2% power.

+15 min N (BOP, CRS) 2 CVCS LP I (RO, CRS) Letdown Heat Exchanger Outlet Temperature Instrument

+25 min (TI-0224) fails high. TV-0224A and TV-0224B fail to reposition.

3 CC05B C (BOP, CRS) Train B Component Cooling Water Heat Exchanger (E-002) tube

+35 min TS (CRS) leak.

4 RX08 C (BOP, CRS) Steam Bypass Control Valves close. Transfer SBCS Master

+45 min Controller (PIC-8431) to Local-Manual to open valves.

5 SG06B C (RO, CRS) Steam Generator Tube Leak (E-089) at 50 gpm.

+50 min TS (CRS) 6 SG06B M (RO, BOP, CRS) Steam Generator Tube Rupture (E-089) at 300 gpm upon Unit trip.

+50 min 7 CCAS LP I (RO) Containment Cooling Actuation Signal fails to actuate.

+60 min

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (TS) Technical Specifications SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc

Appendix D Scenario Outline Form ES-D-1 SCENARIO

SUMMARY

NRC #4 The crew will assume the watch with the Reactor critical at ~2x10-3% power. The crew will raise power using CEA withdrawal per Operating Instruction (OI) SO23-5-1.3.1, Plant Startup from Hot Standby to Minimum Load.

The next event is a high failure of a Letdown temperature instrument. The crew will respond per the Annunciator Response Procedures (ARP) and perform actions to isolate the Boronometer and bypass the Ion Exchanger Demineralizers.

When Letdown conditions are normal, a tube leak will develop on the Train B Component Cooling Water Heat Exchanger. The crew will respond per Abnormal Operating Instruction (AOI) SO23-13-7, Loss of Component Cooling Water/Salt Water Cooling. Crew actions include transferring to the Train A Component Cooling Water System as well is attempting to isolate Train B leakage. The CRS will evaluate Technical Specifications.

When CCW flow is restored, the Steam Bypass Control System (SBCS) Valves will close. Crew actions are per OI SO23-3-2.18, Steam Bypass System Operation and include transferring the SBCS Master Controller to Local-Manual control or operating individual SBCS Valves and restoring Reactor Coolant System temperature and Reactor power level to normal.

When plant conditions are stable, a Steam Generator tube leak will occur. The crew will enter AOI SO23-13-4, RCS Leak and take actions to minimize tube leakage. The size of the leak will require an immediate plant trip and at that time the leak will escalate to a rupture. The crew will enter Emergency Operating Instruction (EOI) SO23-12-1, Standard Post Trip Actions and transition to EOI SO23-12-5, Steam Generator Tube Rupture.

Following the Safety Injection Actuation Signal, the Containment Cooling Actuation Signal fails to actuate requiring manual actions by the crew.

The event is terminated when the affected Steam Generator is cooled down and the Reactor Coolant System is depressurized.

Risk Significance:

  • Risk important components out of service: None
  • Failure of risk important system prior to trip: Loss of Train B Component Cooling Water
  • Risk significant core damage sequence: SGTR with MSIV failure
  • Risk significant operator actions: Restore Non-Critical CCW Loop flow Isolate Ruptured Steam Generator Cooldown and Depressurize RCS SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc

Scenario Event Description NRC Scenario #4 SONGS 2009 Facility NRC Initial License Examination Simulator Scenario Setup Machine Operator: EXECUTE IC #224 and NRC Scenario #4 SETUP file to align components.

VERIFY Control Board Tags removed on P-050, P-015, and G-002.

CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario born concentration.

CHANGE Operator Aid Tag #005-9 (AFW T-120/121 alignment) to AUTO MAKEUP for both T-120 and T-121.

VERIFY both Pressurizer Spray Valves in AUTO.

ENSURE two (2) Charging Pumps running.

ENSURE Train B Component Cooling Water in service.

MOVE Component Cooling Water OOS Tags to Train A components.

ENSURE Steam Generator level is controlled at 50% to 55%.

PLACE Channel X Pressurizer Pressure and Pressurizer Level in service.

PLACE procedures in progress on the RO desk:

- Copy of SO23-5-1.3.1, Plant Startup from Hot Standby to Minimum Load INITIALED through Step 6.5.1.

- MARKED UP copy of SO23-5-1.7, Attachment 9.

- MARKED UP copy of SO23-2-4, Auxiliary Feedwater System Operation Section 6.2.

PLACE the MOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board.

If Group Position(s) is (are) not correct, MOVE CEAs and then RETURN CEAs to Shift Turnover Sheet position (Group 6 @ 80; PLCEAs @ 75).

Significant Control Room Annunciators in Alarm:

50A02 - COLSS ALARM 53A(B)03 - MFWP TURBINE K006 (K005) TRIP 56A30/40/50/60 - LOSS OF LOAD CHANNEL 1/2/3/4 TRIP DISABLED 63E10 - SCE CB TRIP 99A24 - TURBINE TRIP RELAY TRIPPED 99B01 - GENERATOR TRIP 99B19 - VACUUM PROTECTION PLC TROUBLE SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 1 Page 4 of 17 Event

Description:

Rod Withdrawal and Power Increase to ~2% Power Time Position Applicants Actions or Behavior Machine Operator: ENSURE all Simulator Scenario Setup actions are complete.

DIRECT performance of SO23-5-1.3.1, Plant Startup from Hot Standup to

+1 min CRS Minimum Load.

Floor Cue: The startup rate based on Attachment 9 data will be 0.3 to 0.5 DPM. In order to facilitate time requirements, REPORT as the Shift Manager to maintain this rate.

RO DISPLAY the PCS page for Regulating Group 6 per SO23-3-2.20.

VERIFY all CEA Regulating Group bottom lamps on the Core Mimic Panel RO are EXTINGUISHED.

RO POSITION Mode Select Switch to MS (Manual Sequential).

RO POSITION Group Select Switch to CEA Group 6.

RO/CRS When directed by CRS, WITHDRAW Control Rods as required.

RO ESTABLISH a Startup Rate of 0.5 DPM.

RAISE Auxiliary Feedwater flow as required to maintain Steam Generator BOP levels between 50% and 55%.

RO When CEA positioning is complete, PLACE Mode Select Switch to OFF.

VERIFY proper operation of Steam Bypass Control System when the Point of BOP Adding Heat is reached (~2E-1%).

+15 min BOP MAINTAIN Tcold within band by monitoring SBCS operation.

When power has been raised to ~2%, or at Lead Evaluators discretion, PROCEED to Event 2.

SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 2 Page 5 of 17 Event

Description:

Letdown Heat Exchanger Temperature Control Valve Failure Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 2.

- CVCS LP, Temperature Control Valves (TV-0224A and TV-0224B) fail to divert (BYPASS) on high temperature.

Indications Available:

58A32 - LETDOWN HX OUTLET TEMP HI

+30 secs RO REFER to Annunciator Response Procedures.

RECOGNIZE Letdown Heat Exchanger outlet high temperature alarm and RO INFORM CRS ARP SO23-15-58.A, Annunciator 58A32 entry required.

DIRECT performance of ARP SO23-15-58.A, 58A32 - LETDOWN HX CRS OUTLET TEMP HI.

DETERMINE that Demineralizer Temperature Control Valve failed to divert RO on high temperature and Manually POSITION TV-0224B to BYPASS.

DETERMINE that Boronometer Isolation Valve failed to Auto Close on high RO temperature and Manually POSITION TV-0224A to CLOSE.

If Letdown Heat Exchanger is > 130°F take MANUAL control of TIC-0223 per RO SO23-2-17, CCW Operation.

CRS CONTACT I&C to investigate cause of problem.

M.O. Cue: If contacted as I&C to investigate problem, REMOVE override on the valve, WAIT one minute and REQUEST the RO PLACE TIC-0223 back in AUTO. REPORT that the valve has been sticking causing miscues in the temperature controller and that I&C is working on a repair.

+5 min MONITOR Letdown Heat Exchanger outlet temperature at least twice per RO shift.

When plant control is restored, or at Lead Evaluators discretion, PROCEED to Event 3.

SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 3 Page 6 of 17 Event

Description:

Train B Component Cooling Water Heat Exchanger Tube Leak Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 3.

- CC05B, Train B CCW Heat Exchanger tube leak @ 100% severity.

Indications Available:

64A29 - CCW SURGE TANK TRAIN B LEVEL HI/LO (time delay of ~ 2 to 5 min)

+2 min BOP REFER to Annunciator Response Procedures.

M.O. Cue: When the CCW Surge Tank level low alarms, LOWER malfunction CC05B to 50%

severity to facilitate diagnosis of the event.

RECOGNIZE lowering Surge Tank level and INFORM the CRS AOI BOP SO23-13-7 entry required.

CRS DIRECT performance of AOI SO23-13-7, Loss of CCW/SWC.

ISOLATE Radwaste by closing 2HV-6465, 3HV-6465, 2HV-6217, and BOP 3HV-6217.

CRS/BOP DETERMINE that the leak is not isolated.

CRS DIRECT placing Train A CCW/SWC in service.

START CCW Pump P024 or P025 and VERIFY that SWC P112 BOP automatically starts.

+5 min CRS DIRECT transfer of the CCW Non-Critical Loop to Train A.

CRITICAL TASK With loss of flow to the CCW Non-Critical Loop and prior to exceeding RCP STATEMENT operating limits, restore flow to the NCL from any available CCW train.

CRITICAL TASK BOP TRANSFER the CCW Non-Critical Loop to Train A.

CRS DIRECT transfer of Letdown Heat Exchanger to Train A.

SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 3 Page 7 of 17 Event

Description:

Train B Component Cooling Water Heat Exchanger Tube Leak Time Position Applicants Actions or Behavior BOP TRANSFER Letdown Heat Exchanger to Train A.

CRS DIRECT securing CCW Pump P026.

BOP STOP CCW Pump P026 and SWC Pump P114.

M.O. Cue: If directed to rack out breaker for CCW Pump P026, REPORT that it is in progress.

CRS ENSURE ECCS is not required.

CRS/BOP DISPATCH PEO to CLOSE Loop B CCW Surge Tank Outlet, HV-6505.

M.O. Cue: If directed to close 2HV-6505, Train B CCW Surge Tank Outlet Valve, WAIT 3 minutes and EXECUTE remote function CC61.

M.O. Cue: If contacted to report status of Unit 3 CCW Surge Tank Level, REPORT that Train A CCW Surge Tank level is stable and unchanged.

+10 min CRS EVALUATE Technical Specifications.

  • ACTION A.1 - Restore CCW Train to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

When Technical Specifications are addressed, or at Lead Evaluators discretion, PROCEED to Event 4.

SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 4 Page 8 of 17 Event

Description:

Steam Bypass Control Valves Close Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 4.

- RX08, Steam Bypass Control Valves HV-8423 and HV-8425 close.

Indications Available:

50A07 - SDCS DEMAND PRESENT (possible reflash)

Reactor Coolant System temperature rising Reactor power slowly lowering RECOGNIZE Reactor Coolant System temperature rising and power level

+ 1 min RO/BOP lowering.

BOP DETERMINE both Steam Bypass Control Valves have closed.

VERIFY proper operation of the SBCS System per SO23-3-2.18, Steam CRS Bypass System Operation.

Examiner Note: Any one of the methods listed is acceptable to regain control of the Steam Bypass Control Valves.

PERFORM one of the following to regain control of the Steam Bypass BOP Control Valves:

  • TRANSFER Master Controller PIC-8431 to LOCAL MANUAL to open valves.
  • PLACE SBCS Valve Controllers HV-8423 and HV-8425 in LOCAL to open valves.

RESTORE Reactor Coolant System temperature and Reactor power to BOP program.

CRS REFER to SO23-3-2.18, Steam Bypass System Operation as required.

When RCS pressure and temperature control are restored, or at Lead Evaluators discretion, PROCEED to Event 5.

SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 5 Page 9 of 17 Event

Description:

Steam Generator Tube Leak on E089 Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 4.

- SG06B @ 0.15%, Steam Generator Tube Leak on E089 of ~50 gpm.

Indications Available:

60A46 - SECONDARY RADIATION HI Auto Start of standby Charging Pump RO/BOP REFER to Annunciator Response Procedures.

RECOGNIZE increasing radiation levels and INFORM the CRS AOI BOP SO23-13-14 entry required.

+1 min DIRECT performance of SO23-13-14, RCS Leak, Section for Primary to CRS Secondary leakage.

M.O. Cue: When contacted as Chemistry, WAIT 5 minutes and REPORT that a frisk of the SG sample indicates high activity in SG E089. WAIT another 5 minutes, and then REPORT that high activity in SG E089 is verified.

CRS/RO DETERMINE PZR level is lowering.

RO START Charging Pumps to maintain Pressurizer level.

CRS/RO DETERMINE VCT level is lowering.

RO OPERATE Makeup System to maintain VCT level as needed.

DETERMINE Steam Generator tube leak is greater than 75 gpd and rising at CRS/RO greater than 30 gpd/hr.

DIRECT a Reactor Trip and ENTRY into SO23-12-1, Standard Post Trip CRS Actions.

SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 5 Page 10 of 17 Event

Description:

Steam Generator Tube Leak on E089 Time Position Applicants Actions or Behavior

+10 min CRS EVALUATE Technical Specifications.

  • CONDITION B - Primary to secondary LEAKAGE not within limits.
  • ACTION B.1 - Be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
  • ACTION B.2 - Be in MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

When Technical Specifications are addressed, or at Lead Evaluators discretion, PROCEED to Events 6 and 7.

SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 6&7 Page 11 of 17 Event

Description:

Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Events 6 and 7.

- SG06B @ 0.9%, Steam Generator E089 Tube Rupture @ ~300 gpm.

- CCAS LP, Containment Cooling Actuation Signal fails to actuate.

Indications Available:

60A46 - SECONDARY RADIATION HI (reflash) 63B02 - UNIT 2 CRITICAL PARAMETER PROBLEM RO/BOP TRIP the Reactor and ENTER SO23-12-1, Standard Post Trip Actions.

RO VERIFY Reactor Trip:

  • VERIFY Reactor Power lowering and Startup Rate negative.
  • VERIFY maximum of one full length CEA NOT fully inserted.

CRS VERIFY Reactivity Control criteria satisfied.

BOP VERIFY Turbine Trip:

  • HP and LP Stop and Governor Valves closed.
  • VERIFY both Unit Output Breakers open.

CRS INITIATE Administrative Actions:

  • INITIATE Attachment 4, Worksheet.
  • INITIATE Attachment 5, Administrative Actions.

BOP VERIFY Vital Auxiliaries criteria satisfied:

  • VERIFY both 1E 4 kV Buses A04 and A06 energized.
  • VERIFY both 1E 480 V Buses B04 and B06 energized.
  • VERIFY all 1E DC Buses energized.
  • VERIFY all Non-1E 4 kV Buses energized.

SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 6&7 Page 12 of 17 Event

Description:

Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time Position Applicants Actions or Behavior

  • VERIFY one CCW Train operating AND aligned to Non-Critical Loop and Letdown Heat Exchanger.

RO DETERMINE RCS Inventory Control criteria NOT satisfied:

  • DETERMINE PZR level between 10% and 70% and NOT trending to between 30% and 60%.
  • [RNO] DETERMINE PZR Level Control System is NOT restoring PZR level.
  • VERIFY Core Exit Saturation Margin 20°F:

RO DETERMINE RCS Pressure Control criteria NOT satisfied:

  • DETERMINE PZR pressure (WR and NR) between 1740 PSIA and 2380 PSIA and NOT controlled AND NOT trending to 2025 PSIA and 2275 PSIA.
  • [RNO] DETERMINE PZR Pressure Control System is NOT restoring PZR pressure.
  • [RNO] ENSURE Normal and Aux Spray valves closed.
  • [RNO] ENSURE SIAS, CCAS, and CRIS actuated.
  • [RNO] If PZR pressure is < 1430 PSIA, then ENSURE at least one RCP in each loop stopped.

RO VERIFY Core Heat Removal criteria satisfied:

  • VERIFY at least one RCP operating.
  • VERIFY Core Loop T < 10°F.
  • VERIFY Core Exit Saturation Margin 20°F.

Examiner Note: RCS Heat Removal may or may not be satisfied depending upon RCS temperature as the Steam Bypass Control System may be in MANUAL.

SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 6&7 Page 13 of 17 Event

Description:

Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time Position Applicants Actions or Behavior BOP DETERMINE RCS Heat Removal criteria NOT satisfied:

  • VERIFY both SGs level > 21% NR.
  • VERIFY both SGs level < 80% NR.
  • [RNO] If required, manually INITIATE EFAS.
  • DETERMINE Tcold < 545°F and NOT controlled.
  • [RNO] ENSURE SBCS valves closed.
  • [RNO] ENSURE ADVs closed.
  • [RNO] ENSURE SG Blowdown valves closed.
  • E-088 - HV-4054 E-089 - HV-4053
  • [RNO] ENSURE Main Steam to Reheater Valves closed.
  • HV-2703 or HV-2704; HV-2721; HV-2751
  • VERIFY SG pressures greater than 740 PSIA.

RO DETERMINE Containment Isolation criteria NOT satisfied:

  • VERIFY Containment pressure < 1.5 PSIG.
  • VERIFY Containment Area Radiation Monitors energized and NOT alarming or trending to alarm.
  • DETERMINE Secondary Plant Radiation Monitors energized AND alarming or trending to alarm.

RO VERIFY Containment Temperature and Pressure criteria satisfied:

  • VERIFY Containment average temperature < 120°F.
  • VERIFY Containment pressure < 1.5 PSIG.

+15 min CRS DIAGNOSE event in progress:

  • DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.
  • [RNO] COMPLETE Attachment 1, Recovery Diagnostics.
  • [RNO] DIAGNOSE event as SGTR on SG E089.

SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 6&7 Page 14 of 17 Event

Description:

Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time Position Applicants Actions or Behavior RO * [RNO] ENSURE one RCP in each loop stopped.

  • DIRECT initiating Steps 12 through 15.

BOP INITIATE Steps 12 through 15.

CRS DIRECT performance of SO23-12-4, Steam Generator Tube Rupture.

CRS RECORD time of EOI entry __________.

CRS VERIFY SGTR Diagnosis:

  • INITIATE SO23-12-10, Safety Function Status Checks.
  • INITIATE Foldout Page.
  • DIRECT performance of FS-7, SI Throttle/Stop Criteria.
  • DIRECT performance of SO23-12-11, Attachment 22, Non-Qualified Load Restoration.
  • VERIFY SGTR diagnosis using Figure 1, Break Identification Chart.

M.O. Cue: If directed to sample SGs, WAIT 5 minutes and then REPORT that E089 has elevated radiation levels and boron levels. If the SG sample valves are closed, REPORT that you are unable to establish sample flow.

CRS INITIATE Administrative actions:

  • NOTIFY Shift Manager/Operations Leader of SO23-12-4, Steam Generator Tube Rupture initiation.
  • IMPLEMENT Placekeeper.

Reduce Reactor Coolant System Thot to less than 530°F within 30 minutes of CRITICAL TASK optimal EOI entry.

STATEMENT Elapsed Time: ____________

CRITICAL TASK CRS DIRECT lowering RCS THOT to less than 530°F:

SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 6&7 Page 15 of 17 Event

Description:

Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time Position Applicants Actions or Behavior BOP

  • VERIFY both SGs available for cooldown.
  • ENSURE one RCP in each loop stopped.
  • INITIATE lowering THOT to less than 530°F using SBCS.

RO

  • RESET SG Low Pressure Setpoints during controlled cooldown.

RO VERIFY ESF Actuation:

  • DETERMINE SIAS actuation required.
  • DETERMINE PZR pressure trending to SIAS setpoint.

RO ENSURE the following actuated:

  • DETERMINE CCAS did NOT actuate and manually INITIATE CCAS.

CRS RECORD time of SIAS entry __________.

BOP STOP unloaded Diesel Generators (SIAS Override STOP).

BOP INITIATE SO23-12-11, Attachment 22, Non-Qualified Load Restoration.

M.O. Cue: When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored non-qualified loads.

RO ATTEMPT to OVERRIDE and OPEN Instrument Air to Containment.

M.O. Cue: When directed to isolate IA to Containment, REPORT as the ARO that you will restore IA. EXECUTE remote function IA52, to CLOSE MU060, RESET Excess Flow Check Valve, then EXECUTE remote function IA52 to OPEN MU060.

REPORT to the Control Room that Instrument Air to Containment is restored.

Examiner Note: The CRS may elect to secure Train B ECCS components due to loss of Train B Component Cooling Water.

SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 6&7 Page 16 of 17 Event

Description:

Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time Position Applicants Actions or Behavior RO ESTABLISH Optimum SI Alignment:

  • ESTABLISH two train operation.
  • All Charging Pumps operating.
  • One HPSI and one LPSI per train operating.
  • All Cold leg flow paths aligned.
  • VERIFY SI flow required:
  • SI flow indicated.

RO

  • DETERMINE FS-7, VERIFY SI Throttle/Stop Criteria NOT satisfied.

CREW IDENTIFY E089 as affected SG:

  • EVALUATE SG radioactive release indications - rising.
  • SG Blowdown monitors.
  • SG sample results.
  • Steam line monitors.

BOP

  • EVALUATE indications on E089
  • SG level rising when not feeding.
  • Steam/feed flow prior to trip NOT normal.

CRS

  • NOTIFY Shift Manager/Operations Leader that E089 is affected SG.

BOP VERIFY Heat Removal by SG E088:

  • VERIFY AFW Pump P504 available and operating.
  • VERIFY SG E088 available for continued heat removal.

CREW ISOLATE the most affected Steam Generator (SGTR).

RO

  • ENSURE RCS Thot less than 530°F.

SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 4 Event # 6&7 Page 17 of 17 Event

Description:

Steam Generator Tube Rupture on E089 / CCAS Fails to Actuate Time Position Applicants Actions or Behavior Isolate the Most Affected Steam Generator (E089) within 30 minutes of optimal CRITICAL TASK EOI entry.

STATEMENT Elapsed Time: ____________

CRITICAL TASK BOP ISOLATE SG E089, CLOSE / STOP the following components:

MSIV HV-8204 MSIV Bypass HV-8202 ADV HV-8421 MFIV HV-4052 AFW Valves HV-4731 and HV-4715 Steam to AFW P-140 HV-8200 SG Blowdown Isolation HV-4053 SG Water Sample Isolation HV-4057 Electric AFW Pump P-141 CRS

  • RECORD time of SG isolation ____________.

BOP

  • ENSURE ADV on SG E089 - selected to MANUAL.
  • CONTACT outside operator to CLOSE Main Steam Drain Isolation

+30 min BOP valves.

When SG E089 is isolated, or at the Lead Evaluators discretion, TERMINATE the scenario.

SONGS Oct 2009 NRC Sim Scenario #4 Rev 0.doc

Appendix D Scenario Outline Form ES-D-1 Facility: SONGS 2 and 3 Scenario No.: 5 Op Test No.: October 2009 NRC Examiners: Operators:

Initial Conditions:

  • Train B Component Cooling Water Pump (P-026) in service.
  • Channel Y Pressurizer Pressure and Level Control in service.
  • Control Element Assembly Calculator #2 in service.
  • Vacuum Pump (P-054) OOS for hogging valve repair.
  • Fire Computer is OOS.

Turnover: Maintain steady-state plant conditions.

Critical Tasks:

  • Perform High Pressure Safety Injection Throttle/Stop actions (LOCA).

Event No. Malf. No. Event Type* Event Description 1 SC01D C (BOP, CRS) Salt Water Cooling Pump (P-114) trips on seized shaft.

+10 min TS (CRS) 2 RC15B I (RO, CRS) Pressurizer Pressure Control Channel (PT-0100Y) fails low.

+20 min 3 RP18 I (RO, CRS) Control Element Assembly Calculator #2 failure.

+30 min TS (CRS) 4 TU08 M (RO, BOP, CRS) Inadvertent Main Turbine trip.

+35 min 5 RP15 I (RO) Reactor fails to automatically trip.

+35 min 6 TC02E C (BOP) High Pressure Turbine Stop Valve (HV-2200E) fails to close.

+35 min 7 RC18A M (RO, BOP, CRS) Pressurizer Safety Valve (PSV-0200) fails open on the trip and

+45 min reseats after Safety Injection is actuated.

8 FW23 C (BOP) Loss of Condenser vacuum.

+45 min

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (TS) Technical Specifications SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc

Appendix D Scenario Outline Form ES-D-1 SCENARIO

SUMMARY

NRC #5 The crew will assume the watch and maintain steady-state conditions per Operating Instruction (OI)

SO23-5-1.7, Power Operations.

The first event is a loss of Saltwater Cooling Pump P-114. The crew will respond per Abnormal Operating Instruction (AOI) SO23-13-7, Loss of Component Cooling Water/Saltwater Cooling System by starting Train A Component Cooling Water System. Additionally, the Non-Critical Loop and Letdown Heat Exchanger must also be transferred to Train A. The CRS will evaluate Technical Specifications.

The next event is a low failure of Pressurizer Pressure Channel Y. Operator actions are per AOI SO23-13-27, Pressurizer Pressure and Level Malfunction. The crew will transfer to Channel X and restore Pressurizer pressure and heater functions.

Once plant conditions are stable, Control Element Assembly Calculator (CEAC) #2 will fail. The crew will respond per the Annunciator Response Procedures (ARP) and OI SO23-3-2.13, Core Protection /

Control Element Assembly Calculator Operation and transfer to CEAC #1 to restore Rod Position Indication. The CRS will evaluate Technical Specifications.

The major event is initiated by an inadvertent Main Turbine trip. Upon Main Turbine trip, a Pressurizer Safety Valve will open and remain open until Safety Injection actuates and close when the Safety Injection Actuation Signal is received. The crew will enter Emergency Operating Instruction (EOI)

SO23-12-1, Standard Post Trip Actions. The CRS will determine that entry into EOI SO23-12-2, Reactor Trip Recovery is warranted because Pressurizer pressure and level are rising with no indications of radiation or leakage into Containment. In the event the opening and closing of the Pressurizer Safety Valve is not observed, the crew may enter EOI SO23-12-3, Loss of Coolant Accident.

The inadvertent Main Turbine trip is complicated by the Reactor failing to trip and a High Pressure Turbine Stop Valve remaining open. Additionally, a loss of Condenser vacuum occurs necessitating Reactor Coolant System temperature control using the Atmospheric Dump Valves.

The event is terminated when actions for High Pressure Safety Injection Throttle/Stop are performed per EOI SO23-12-2 or EOI SO23-12-11, EOI Supporting Attachments in order to prevent overfilling of the Pressurizer.

Risk Significance:

  • Risk important components out of service: None
  • Failure of risk important system prior to trip: Loss of Train B Component Cooling Water
  • Risk significant operator actions: Transfer CCW Non-Critical Loop Manually Trip the Reactor Perform HPSI Throttle/Stop SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc

Scenario Event Description NRC Scenario 5 SONGS 2009 Facility NRC Initial License Examination Simulator Scenario Setup Machine Operator: EXECUTE IC #225 and NRC Scenario #5 SETUP file to align components.

HANG Control Board Tags on P-054.

CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario born concentration.

RESET CVCS Batch Counters to zero (0).

VERIFY both Pressurizer Spray Valves in AUTO.

ENSURE Train B Component Cooling Water Pump (P-026) in service.

ENSURE CEAC #2 in service.

ENSURE Channel Y Pressurizer Pressure and Pressurizer Level in service.

PLACE procedures in progress on the RO desk:

- Copy of SO23-5-1.7, Power Operations open to Section 6.1, Guidelines for Steady State Operation.

PLACE the BOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board.

If Group Position(s) is (are) not correct, MOVE CEAs and then RETURN CEAs to Shift Turnover Sheet position (Group 6 @ 137 / PLCEAs @ 115).

Control Room Annunciators in Alarm:

None SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 1 Page 4 of 17 Event

Description:

Train B Salt Water Cooling Pump Seized Shaft Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 1.

- SC01D, Salt Water Cooling Pump P-114 seized shaft.

Indications Available:

64A24 - SWC PUMP MOTOR BRG TEMP HI 64A43 - SWC PUMP TRAIN B OC 64A20 - SWC TRAIN B FLOW HI/LO 64A60 - SWC TRAIN B FLOW TROUBLE Salt Water Cooling Pump P-114 tripped indication

+30 secs BOP REFER to Annunciator Response Procedures.

DETERMINE that SWC P114 has tripped and INFORM the CRS that entry BOP into SO23-13-7 is required.

CRS DIRECT performance of AOI SO23-13-7, Loss of CCW/SWC.

CRS DIRECT transfer of CCW to Train A.

START CCW Pump P024 or P025 and VERIFY that SWC Pump P112 BOP automatically starts.

BOP ALIGN Train A CCW to Non-Critical Loop and Letdown Heat Exchanger.

CRS DISPATCH operators to CHECK SWC Pump P114 and associated breaker.

BOP STOP CCW Pump P026.

M.O. Cue: When directed to investigate P114 trip, WAIT 3 minutes and then REPORT that SWC Pump P114 motor has an odor of burnt insulation.

M.O. Cue: When directed to investigate P114 breaker, WAIT 3 minutes and then REPORT that SWC Pump P114 breaker has overcurrent flags on Phases B and C.

SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 1 Page 5 of 17 Event

Description:

Train B Salt Water Cooling Pump Seized Shaft Time Position Applicants Actions or Behavior CRS EVALUATE Technical Specifications.

  • ACTION A - Restore SWC Train to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

Examiner Note: The crew may decide to place CCW Pump P026 OOS, swap CCW Pump P025 to Train B, and/or place Train B HPSI and CS Pumps OOS. Crew may remove DC Control Power for Train B HPSI and CS pumps to avoid damage due to lack of cooling water.

M.O. Cue: Due to time restrictions, ACKNOWLEDGE, but do NOT perform, the following system alignments:

  • If directed to open the DC power supply breaker for CCW Pumps P026, ACKNOWLEDGE the order but do not perform.
  • If directed to transfer Emergency Chiller E-336 to Unit 3, ACKNOWLEDGE the order but do not perform.
  • If directed to transfer CCW Pump P025 or transfer HPSI Pump P018 from Train A to Train B, ACKNOWLEDGE the order but do not perform.

+10 min CRS ENSURE ECCS is not required.

When Train A CCW is aligned to the NCL and the Letdown Heat Exchanger, and Technical Specifications have been addressed, or at Lead Evaluators discretion, PROCEED to Event 2.

SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 2 Page 6 of 17 Event

Description:

Pressurizer Pressure Controlling Channel Fails Low Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 2.

- RC15B, Pressurizer Pressure Controlling Channel PT-0100Y fails low.

Indications Available:

50A04 - PZR PRESS DEVIATION HI / LO 50A14 - PZR PRESS HI / LO

+30 secs RO REFER to Annunciator Response Procedures.

RO DETERMINE which channel initiated the alarm using PR-100.

  • RECOGNIZE Channel Y (PR-0100B) has failed low and INFORM CRS that AOI SO23-13-27 entry required.

If desired, SELECT PIC-100 to MANUAL and return pressure to the normal RO band and ENSURE heaters energized and PZR pressure trending to normal.

DIRECT performance of AOI SO23-13-27, Pressurizer Pressure and Level CRS Malfunction.

RO VERIFY PI-0100X is OPERABLE.

POSITION HS-0100A, Pressurizer Pressure Channel Select Switch to RO Channel X per ARP or AOI.

RO RESTORE PZR heaters to normal configuration as required.

  • PLACE heater control switches to OFF, then AUTO.

RO VERIFY normal Charging and Letdown in service.

SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 2 Page 7 of 17 Event

Description:

Pressurizer Pressure Controlling Channel Fails Low Time Position Applicants Actions or Behavior Examiner Note: RCS Pressure must rise above 2275 psia to make this Technical Specification call.

+10 min CRS EVALUATE Technical Specifications.

  • CONDITION A - Pressurizer pressure or RCS flow rate not within limits.
  • ACTION A.1 - Restore parameter(s) to within limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

When Technical Specifications are addressed, or at Lead Evaluators discretion, PROCEED to Event 3.

SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 3 Page 8 of 17 Event

Description:

Control Element Assembly Calculator Failure Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 3.

- RP18, Control Element Assembly Calculator #2 failure.

Indications Available:

56C42 - CEAC 2 FAILURE

+30 secs RO REFER to Annunciator Response Procedures.

RO SELECT CEAC #1 to display on the CEA-CRT to verify failure.

DETERMINE CEAC #2 failure and INFORM the CRS SO23-3-2.13, Core RO Protection / Control Element Assembly Calculator Operation entry required.

DIRECT performance of SO23-3-2.13, Section for CEAC/RSPT Erratic or CRS INOP.

DETERMINE failure has NOT reset by DEPRESSING the CEAC Fail RO Indicator Pushbutton on the ROM Channel C.

Floor Cue: Once the actions of the ARP are complete, DIRECT the CRS to evaluate Technical Specifications. Do not allow the CRS to change the addressable constants for the INOP CEAC due to time constraints.

PERFORM CEA Verification once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per SO23-3-3.25 Section for RO Reactivity Control Systems.

RO NOTIFY the Computer Technician to investigate the CEAC Channel failure.

RO ENSURE the CEA-CRT is displaying CEAC #1.

SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 3 Page 9 of 17 Event

Description:

Control Element Assembly Calculator Failure Time Position Applicants Actions or Behavior

+10 min CRS EVALUATE Technical Specifications.

  • LCO 3.3.3.A, Control Element Assembly Calculator (CEAC).
  • ACTION A.1 - Perform CEA Verification once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, and
  • ACTION A.2 - Restore CEAC to OPERABLE status within 7 days.

When Technical Specifications are addressed, or at Lead Evaluators discretion, PROCEED to Events 4, 5, 6, 7, and 8.

SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 4, 5, 6, 7, & 8 Page 10 of 17 Event

Description:

Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Events 4, 5, 6, 7, and 8.

- FW09B, Inadvertent Turbine trip.

- RP15, Automatic Reactor trip failure.

- TC02E, HP Turbine Stop Valve fails to close.

- RC18A, Pressurizer Safety Valve fails open upon Reactor trip.

- FW23, Loss of Condenser Vacuum.

Indications Available:

99A24 - TURBINE TRIP RELAY TRIPPED 99B01 - GENERATOR TRIP

+10 secs RO/BOP RECOGNIZE inadvertent Turbine trip without a corresponding Reactor trip.

Manually trip the Reactor due to Reactor Protection System failure, within one CRITICAL TASK (1) minute of Reactor Trip criteria being exceeded.

STATEMENT Elapsed Time: __________

CRITICAL TASK RO/BOP MANUALLY TRIP the Reactor.

VERIFY Reactor trip and DIRECT crew to perform actions of SO23-12-1, CRS Standard Post Trip Actions.

RO VERIFY Reactor Trip:

  • VERIFY Reactor Power lowering and Startup Rate negative.
  • VERIFY maximum of one full length CEA NOT fully inserted.

CRS VERIFY Reactivity Control criteria satisfied.

M.O. Cue: VERIFY malfunction TC02E deleted when manual Turbine trip is performed.

BOP DETERMINE Turbine tripped with HV-2200E, Governor OPEN.

BOP

  • DETERMINE HP Turbine Stop Valve HV-2200E NOT closed.
  • VERIFY both Unit Output Breakers open.

SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 4, 5, 6, 7, & 8 Page 11 of 17 Event

Description:

Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time Position Applicants Actions or Behavior

CRS INITIATE Administrative Actions:

  • INITIATE Attachment 4, Worksheet.
  • INITIATE Attachment 5, Administrative Actions.

BOP VERIFY Vital Auxiliaries criteria satisfied:

  • VERIFY both 1E 4 kV Buses A04 and A06 energized.
  • VERIFY both 1E 480 V Buses B04 and B06 energized.
  • VERIFY all 1E DC Buses energized.
  • VERIFY all Non-1E 4 kV Buses energized.
  • VERIFY CCW Train operating AND aligned to Non-Critical Loop and Letdown Heat Exchanger.

RO VERIFY RCS Inventory Control criteria satisfied:

  • VERIFY PZR level between 10% and 70% AND trending to between 30% and 60%.
  • VERIFY Core Exit Saturation Margin > 20°F:

Examiner Note: Depending upon the time that RCS Pressure Control criteria is verified, this Safety Function may or may not be met. RCS pressure will drop to the SIAS setpoint and then the Pressurizer Safety Valve will close. RCS pressure will then rise due to three Charging Pumps in operation. This could also dictate whether the CRS enters SO23-12-3, LOCA or SO23-12-2, Reactor Trip Recovery.

RO VERIFY RCS Pressure Control criteria satisfied:

  • VERIFY PZR pressure between 1740 PSIA and 2380 PSIA AND trending to between 2025 PSIA and 2275 PSIA.

SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 4, 5, 6, 7, & 8 Page 12 of 17 Event

Description:

Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time Position Applicants Actions or Behavior RO VERIFY Core Heat Removal criteria is satisfied:

  • VERIFY at least one RCP operating.
  • VERIFY core loop T less than 10°F.
  • VERIFY Core Exit Saturation Margin > 20°F.

BOP VERIFY RCS Heat Removal criteria satisfied:

  • [RNO] ENSURE EFAS actuated.
  • VERIFY heat removal is adequate.
  • VERIFY Tcold trending to between 545°F and 555°F.
  • VERIFY SG pressures approximately 1000 PSIA.

RECOGNIZE loss of Condenser vacuum and place Atmospheric Dump BOP Valves in service.

RO VERIFY Containment Isolation criteria satisfied:

  • VERIFY Containment pressure < 1.5 PSIG.
  • VERIFY Containment Area Radiation Monitors energized AND NOT RO alarming or trending to alarm.
  • VERIFY Secondary Plant Radiation Monitors energized AND NOT alarming or trending to alarm.

RO VERIFY Containment Temperature and Pressure criteria satisfied:

  • VERIFY Containment average temperature < 120°F.
  • VERIFY Containment pressure < 1.5 PSIG.

SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 4, 5, 6, 7, & 8 Page 13 of 17 Event

Description:

Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time Position Applicants Actions or Behavior Examiner Note: The CRS will either diagnose a LOCA inside Containment and enter SO23-12-3, LOCA or recognize that all Safety Function Criteria have been met and enter SO23-12-2, Reactor Trip Recovery. Either procedure entry is acceptable because both will yield Safety Injection Throttle / Stop actions.

CRS DIAGNOSE event in progress:

  • DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.
  • [RNO] COMPLETE Attachment 1, Recovery Diagnostics.
  • [RNO] If LOCA inside Containment is diagnosed, ENSURE at least one RCP in the each loop stopped.
  • DIRECT initiating Steps 12 through 15.

BOP INITIATE Steps 12 through 15.

Examiner Note: The following steps are from SO23-12-3, Loss of Coolant Accident.

If SO23-12-2, Reactor Trip Recovery is selected it is addressed later in this scenario.

CRS DIRECT performance of SO23-12-3, LOCA.

  • RECORD time of EOI entry __________.

+15 min CRS VERIFY LOCA diagnosis:

  • INITIATE SO23-12-10, Safety Function Status Checks.
  • INITIATE Foldout Page.
  • DIRECT performance of FS-7, Verify SI Throttle/Stop Criteria.
  • DIRECT performance of Attachment 22, Non-Qualified Load Restoration.
  • VERIFY LOCA diagnosis, using Figure 1, Break Identification Chart.

SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 4, 5, 6, 7, & 8 Page 14 of 17 Event

Description:

Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time Position Applicants Actions or Behavior M.O. Cue: If directed to sample SGs, WAIT 5 minutes and then REPORT that E088 and E089 both have activity near background, and normal boron levels. If the SG sample valves are closed, REPORT unable to establish sample flow.

M.O. Cue: When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored Non-Qualified Loads.

CRS INITIATE Administrative actions:

  • NOTIFY Shift Manager/Operations Leader of SO23-12-3, Loss of Coolant Accident initiation.
  • IMPLEMENT Placekeeper.

RO DETERMINE ESF actuation NOT required.

  • DETERMINE Pressurizer pressure is greater than SIAS setpoint and Containment pressure is less than 3.4 psig.

CRS TRANSITION to Step 7.

CRS INITIATE applicable actions of SO23-12-11, Attachment 2, Floating Steps.

RO DETERMINE FS-7, VERIFY SI Throttle/Stop Criteria satisfied.

BOP

  • VERIFY at least one SG operating with ADVs and feedwater available.

RO

  • VERIFY Pressurizer level greater than 30% and not lowering.

RO

  • VERIFY Core Exit Saturation Margin 20°F.

RO

  • VERIFY Reactor Vessel level 100% (Plenum).

CRS/RO

  • VERIFY RCS cooldown not in progress.

RO

  • VERIFY SI Pumps NOT operating to meet RC-3 Success Path.

Actions are taken to control Safety Injection flow rate to maintain or recover SI CRITICAL TASK Throttle / Stop criteria. Pressurizer level increase and RCS repressurization is STATEMENT stopped / controlled.

SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 4, 5, 6, 7, & 8 Page 15 of 17 Event

Description:

Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time Position Applicants Actions or Behavior CRITICAL TASK RO PERFORM SI Throttle/Stop actions.

RO

  • THROTTLE or STOP SI Pumps as required, one train at a time.

RO

  • VERIFY Pressurizer level less than 80%.

RO

  • VERIFY Charging Pumps NOT operating to meet RC-2 Success Path.

RO

  • STOP Charging Pumps as required, one at a time.

RO

  • MAINTAIN Throttle Stop criteria satisfied.

RO

  • VERIFY Containment pressure < 3.4 psig.

RO/BOP

Examiner Note: The following steps are from SO23-12-2, Reactor Trip Recovery.

CRS DIRECT performance of SO23-12-2, Reactor Trip Recovery.

  • ENSURE SO23-12-1, Standard Post Trip Actions Steps 1 through 11 complete.
  • RECORD time of EOI entry __________.

+15 min CRS VERIFY Reactor Trip Recovery diagnosis:

  • INITIATE SO23-12-10, LOCA Safety Function Status Checks.

CRS INITIATE Administrative Actions:

  • NOTIFY Shift Manager/Operations Leader of SO23-12-2, Reactor Trip Recovery initiation.
  • IMPLEMENT Placekeeper.

RO VERIFY Reactivity Control.

  • VERIFY a maximum of one full length CEA NOT fully inserted.

SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 4, 5, 6, 7, & 8 Page 16 of 17 Event

Description:

Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time Position Applicants Actions or Behavior RO ESTABLISH Pressurizer Level Control:

  • VERIFY Pressurizer level between 10% and 70% and trending to between 30% and 60%.

RO ESTABLISH Pressurizer Pressure Control:

  • VERIFY Pressurizer pressure between 1740 PSIA and 2380 PSIA and trending to between 2025 PSIA and 2275 PSIA.

RO DETERMINE SIAS actuated:

  • INITIATE Attachment 2, SI Throttle/Stop actions.

RO DETERMINE FS-7, VERIFY SI Throttle/Stop Criteria satisfied.

BOP

  • VERIFY at least one SG operating with ADVs and feedwater available.

RO

  • VERIFY Pressurizer level greater than 30% and not lowering.

RO

  • VERIFY Core Exit Saturation Margin 20°F.

RO

  • VERIFY Reactor Vessel level 100% (Plenum).

CRS/RO

  • VERIFY RCS cooldown not in progress.

RO

  • VERIFY SI Pumps NOT operating to meet RC-3 Success Path.

Actions are taken to control Safety Injection flow rate to maintain or recover SI CRITICAL TASK Throttle / Stop criteria. Pressurizer level increase and RCS STATEMENT re-pressurization is stopped / controlled.

CRITICAL TASK RO PERFORM SI Throttle/Stop actions.

RO

  • THROTTLE or STOP SI Pumps as required, one train at a time.

RO

  • VERIFY Pressurizer level less than 80%.

RO

  • VERIFY Charging Pumps NOT operating to meet RC-2 Success Path.

RO

  • STOP Charging Pumps as required, one at a time.

RO

  • MAINTAIN Throttle Stop criteria satisfied.

RO

  • VERIFY Containment pressure < 3.4 psig.

SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc

Appendix D Operator Action Form ES-D-2 Operating Test : NRC Scenario # 5 Event # 4, 5, 6, 7, & 8 Page 17 of 17 Event

Description:

Inadvertent Turbine Trip / Automatic Reactor Trip Failure / HP Turbine Stop Valve Failure / Pressurizer Safety Valve Fails Open / Loss of Condenser Vacuum Time Position Applicants Actions or Behavior RO/BOP

BOP STOP unloaded Diesel Generators.

BOP INITIATE Attachment 3, Non-Qualified Load Restoration.

M.O. Cue: When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored Non-Qualified Loads.

VERIFY PZR pressure above RCP NPSH requirements of SO23-12-11, RO Attachment 29.

CRS/RO VERIFY Core Exit Saturation Margin above 160°F.

+30 min CRS/RO VERIFY Core Exit Saturation Margin above 80°F.

When Core Exit Saturation Margin is verified, or at Lead Evaluators discretion, TERMINATE the scenario.

SONGS Oct 2009 NRC Sim Scenario #5 Rev 0.doc

ES-301 Transient and Event Checklist Form ES-301-5 Facility: SONGS 2 and 3 Date of Exam: 10/19/09 Operating Test No.: NRC A E SCENARIOS P V P E SONGS #1 SONGS #2 SONGS #3 SONGS #4 L N T MINIMUM(*)

I T CREW CREW CREW CREW O C

POSITION POSITION POSITION POSITION T A T A

N Y S A B S A B S A B S A B R T O R T O R T O R T O L R I U T P E O C P O C P O C P O C P RX - - - - 0 1 1 0 NOR 4 3 1 1 2 1 1 1 SROU I/C 1,2,3, 1,2,4 2,3,4, 2,3,4, 7 4 4 2 5 5 5 1,2 MAJ 6 5,6 6 6 3 2 2 1 TS 1,3 1,4 2,4 3,5 4 0 2 2 RX - 4 - 3 - 1 - 1 1 1 1 0 NOR 4 - 3 - 1 - 1 - 1 1 1 1 SROI I/C 1,2,3, 3,5,8 1,2,4 4,8 2,3,4, 3,4,7 2,3,4, 2,7 6 4 4 2 1,2,3 5 5 5 MAJ 6 6 5,6 5,6 6 6 6 6 3 2 2 1 TS 1,3 - 1,4 - 2,4 - 3,5 - 2 0 2 2 RX 4 - 3 - 1 - 1 - 1 1 1 0 NOR - 4 - 3 - 1 - 1 1 1 1 1 RO I/C 3,5,8 2,3,7 4,8 2,4,7 3,4,7 4,5,8 2,7 3,4 5 4 4 2 2 MAJ 6 6 5,6 5,6 6 6 6 6 3 2 2 1 TS - - - - - - - - 0 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

NUREG 1021 Revision 9.1 Page 1 of 3 SONGS Oct 2009 NRC ES-301-5 Transient and Event Checklist Rev 1.doc

ES-301 Transient and Event Checklist Form ES-301-5 Facility: SONGS 2 and 3 Date of Exam: 10/19/09 Operating Test No.: NRC A E SCENARIOS P V P E SONGS #1 SONGS #2 SONGS #3 SONGS #4 L N T MINIMUM(*)

I T CREW CREW CREW CREW O C

POSITION POSITION POSITION POSITION T A T A

N Y S A B S A B S A B S A B R T O R T O R T O R T O L R I U T P E O C P O C P O C P O C P RX - - - - 0 1 1 0 NOR 4 3 1 1 2 1 1 1 SROU I/C 1,2,3, 1,2,4 2,3,4, 2,3,4, 7 4 4 2 5 5 5 3

MAJ 6 5,6 6 6 3 2 2 1 TS 1,3 1,4 2,4 3,5 4 0 2 2 RX - 4 - 3 - 1 - 1 1 1 1 0 NOR 4 - 3 - 1 - 1 - 2 1 1 1 SROI I/C 1,2,3, 3,5,8 1,2,4 4,8 2,3,4, 3,4,7 2,3,4, 2,7 10 4 4 2 4,5 5 5 5 MAJ 6 6 5,6 5,6 6 6 6 6 4 2 2 1 TS 1,3 - 1,4 - 2,4 - 3,5 - 4 0 2 2 RX 4 - 3 - 1 - 1 - 1 1 1 0 NOR - 4 - 3 - 1 - 1 2 1 1 1 RO I/C 3,5,8 2,3,7 4,8 2,4,7 3,4,7 4,5,8 2,7 3,4 9 4 4 2 5,7 MAJ 6 6 5,6 5,6 6 6 6 6 4 2 2 1 TS - - - - - - - - 0 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

NUREG 1021 Revision 9.1 Page 2 of 3 SONGS Oct 2009 NRC ES-301-5 Transient and Event Checklist Rev 1.doc

ES-301 Transient and Event Checklist Form ES-301-5 Facility: SONGS 2 and 3 Date of Exam: 10/19/09 Operating Test No.: NRC A E SCENARIOS P V P E SONGS #1 SONGS #2 SONGS #3 SONGS #4 L N T MINIMUM(*)

I T CREW CREW CREW CREW O C

POSITION POSITION POSITION POSITION T A T A

N Y S A B S A B S A B S A B R T O R T O R T O R T O L R I U T P E O C P O C P O C P O C P RX 4 - 3 - 1 - 1 - 1 1 1 0 NOR - 4 - 3 - 1 - 1 2 1 1 1 RO I/C 3,5,8 2,3,7 4,8 2,4,7 3,4,7 4,5,8 2,7 3,4 8 4 4 2 1,3 MAJ 6 6 5,6 5,6 6 6 6 6 4 2 2 1 TS - - - - - - - - 0 0 2 2 RX 4 - 3 - 1 - 1 - 1 1 1 0 NOR - 4 - 3 - 1 - 1 1 1 1 1 RO I/C 3,5,8 2,3,7 4,8 2,4,7 3,4,7 4,5,8 2,7 3,4 6 4 4 2 4 MAJ 6 6 5,6 5,6 6 6 6 6 3 2 2 1 TS - - - - - - - - 0 0 2 2 RX 4 - 3 - 1 - 1 - 1 1 1 0 NOR - 4 - 3 - 1 - 1 2 1 1 1 RO I/C 3,5,8 2,3,7 4,8 2,4,7 3,4,7 4,5,8 2,7 3,4 9 4 4 2 6

MAJ 6 6 5,6 5,6 6 6 6 6 4 2 2 1 TS - - - - - - - - 0 0 2 2 RX 4 - 3 - 1 - 1 - 1 1 1 0 NOR - 4 - 3 - 1 - 1 1 1 1 1 RO I/C 3,5,8 2,3,7 4,8 2,4,7 3,4,7 4,5,8 2,7 3,4 6 4 4 2 8 MAJ 6 6 5,6 5,6 6 6 6 6 3 2 2 1 TS - - - - - - - - 0 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

NUREG 1021 Revision 9.1 Page 3 of 3 SONGS Oct 2009 NRC ES-301-5 Transient and Event Checklist Rev 1.doc

ES-301 Competencies Checklist Form ES-301-6 Facility: SONGS Date of Examination: 10/19/09 Operating Test No. NRC 1-4 SRO RO (ATC) BOP Competencies SCENARIO SCENARIO SCENARIO 1 2 3 4 1 2 3 4 1 2 3 4 Interpret/Diag-1,2,3,4, 1,2,4,5, 1,2,3, 2,3,4,5, 1,3,5, 1,4,5, 1,2,3, 2,5,6, 2,3,6, 2,4,5, 4,5,6, nose Events 5,6 6,7 4,5 6 6,8 6,8 6,7 7 7 6,7 8 3,4,6 and Conditions Comply With 1,3,4, 1,3,4, 1,2,3, 1,2,5, 2,3,4, 2,3,4, 1,4,5, 1,3,4, and Use ALL ALL ALL ALL 5,6,8 5,6,8 4,6,7 6,7 6,7 5,6,7 6,8 6 Procedures (1)

Operate 1,2,3, 3,4,5, 1,3,4, 1,2,3, 1,2,5, 2,3,4, 1,4,5, 1,3,4, Control Boards N/A N/A N/A N/A 6,8 5,6,8 4,6,7 6,7 6,7 4,5,6, 6,8 6 7

(2)

Communicate 1,2,3, 1,3,4, 1,3,4, 1,2,3, 1,2,5, 2,3,4, 1,4,5, 1,3,4, and ALL ALL ALL ALL 5,6,8 5,6,8 4,6,7 6,7 6,7 4,5,6, 6,8 6 7

Interact Demonstrate Supervisory ALL ALL ALL ALL N/A N/A N/A N/A N/A N/A N/A N/A Ability (3)

Comply With and Use Tech. 1,3 1,4 2,4 3,5 N/A N/A N/A N/A N/A N/A N/A N/A Specs. (3)

Notes:

(1) Includes Technical Specification compliance for an RO.

(2) Optional for an SRO-U.

(3) Only applicable to SROs.

Instructions:

Circle the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.

NUREG-1021, Revision 9.1 SONGS Oct 2009 ES-301-6 Rev 0