{{#Wiki_filter:FACILITY NAME: Harris Nulear Plant Section 8 REPORTNUMBER:
{{#Wiki_filter:FACILITY NAME:          Harris Nulear Plant                          Section 8
____
                                ~O~5~OO=O~40~O~~=O~O~9-~30=2~____
____ _ FINAL RO WRITTEN EXAM CONTENTS:
REPORTNUMBER: ____~O~5~O~OO~4~O~~~2~OO~9~-3~O~2~
RO Written Exam (75 'as given' questions with changes made .,during administration annotated)
FINAL RO WRITTEN EXAM CONTENTS:
Handouts Provided To Applicants 0" Answer Key Location of Electronic Files: Submitted B
    ~inal RO Written Exam (75 'as given' questions with changes made
Verified FACILITY NAME: Harris Nulear Plant Section 8 REPORTNUMBER:
        .,during puring administration annotated)
____
        ~eference Handouts Provided To Applicants cr~eference G
____ _ FINAL RO WRITTEN EXAM CONTENTS:
0" Answer Key
RO Written Exam (75 'as given' questions with changes made puring administration annotated)
[2{
G Handouts Provided To Applicants
Location of Electronic Files:
[2{
By'~. :.......r~----'-.il::--t-----
Submitted B    :.....Jt'!o'~---\.,,\,.....-+----- Verified By----J.~~~::
D. Reducing letdown to minimum and establish an RCS pH between 6.5 and 7.5 by chemical addition.
D. Reducing letdown to minimum and establish an RCS pH between 6.5 and 7.5 by chemical addition.
Tuesday, December 08,20094:18:12 PM 23 23. Given the following plant conditions:
Tuesday, December 08,20094:18:12 PM                                                    23
-The Reactor has been operating at 100 percent power for 30 days -Chemistry reports that RCS activity is 1 .5 microcuries per gram DOSE EQUIVALENT 1-131 WHICH ONE of the following actions lAW AOP-032, High RCS Activity, will be utilized to reduce RCS activity?
: 24. Given the following plant conditions:
A. Venting the Volume Control Tank (VCT) to the Waste Gas System. B. Placing cation demineralizer in service. C
        - A LOCA has occurred
        - RCS pressure is 1100 psig and stable
        - Containment pressure rose to 2.6 psig and is currently 2.1 psig and stable
        - The crew is performing actions contained in EPP-009, Post LOCA Cooldown and Depressurization Which ONE of the following describes the method that will be used to perform the cooldown of the RCS?
ReS?
Perform the cooldown cool down using ...
A. SIG PORVs at less than 100°F per hour.
B. SIG PORVs at the maximum achievable rate.
C. Condenser steam dumps at less than 100°F per hour.
D. Condenser steam dumps at maximum achievable rate.
Tuesday, December 08,20094:18:12 PM                                                    24
: 25. Given the following plant conditions:
        - FRP
: 52. The Treated Laundry and Hot Shower Tank Pump Discharge radiation monitor uses a (1) detector because of the detector's ability to detect (2) radiation.
: 52. The Treated Laundry and Hot Shower Tank Pump Discharge radiation monitor uses a (1) detector because of the detector's ability to detect (2) radiation.
(1 ) (2) A. Scintillation beta B. Scintillation gamma C. G-M Tube beta D. G-M Tube gamma Tuesday, December 08,20094:18:12 PM 52 52. The Treated Laundry and Hot Shower Tank Pump Discharge radiation monitor uses a (1) detector because of the detector's ability to detect (2) radiation.
(1 )                   (2)
(1 ) (2) A. Scintillation beta B. Scintillation gamma C. G-M Tube beta D. G-M Tube gamma Tuesday, December 08,20094:18:12 PM 52
A.       Scintillation               beta B.     Scintillation             gamma C.     G-M Tube                   beta D.     G-M Tube                   gamma Tuesday, December 08,20094:18:12 PM                                                 52
: 53. Given the following plant conditions:  
: 53. Given the following plant conditions:
-The plant was in Mode 4 when a Loss of Off-site power occurred -The 'A' EDG failed to start -The '8' NSW pump is tagged out for maintenance Which ONE of the following choices correctly completes the statement below? ESW is providing flow to CCW Heat Exchanger(s)
        - The plant was in Mode 4 when a loss Loss of Off-site power occurred
(1) with ESW return header flow aligned to the (2) . A. (1) '8' ONLY (2) Auxiliary Reservoir B. (1) '8' ONLY (2) Cooling Tower Basin C. (1) 'A' AND 'B' (2) Auxiliary Reservoir D. (1) 'A' AND 'B' (2) Cooling Tower Basin Tuesday, December 08,20094:18:12 PM 53 53. Given the following plant conditions:
        - The 'A' EDG failed to start
-The plant was in Mode 4 when a loss of Off-site power occurred -The 'A' EDG failed to start -The 'B' NSW pump is tagged out for maintenance Which ONE of the following choices correctly completes the statement below? ESW is providing flow to CCW Heat Exchanger(s)
                '8' NSW pump is tagged out for maintenance
(1) with ESW return header flow aligned to the (2) . A. (1) 'B' ONLY (2) Auxiliary Reservoir B. (1) 'B'ONlY (2) Cooling Tower Basin C. (1) 'A' AND 'B' (2) Auxiliary Reservoir D. (1) 'A' AND 'B' (2) Cooling Tower Basin Tuesday, December 08,20094:18:12 PM 53
        - The 'B' Which ONE of the following choices correctly completes the statement below?
: 54. Given the following plant conditions:  
ESW is providing flow to CCW Heat Exchanger(s)         (1) with ESW return header flow aligned to the (2) .
-The plant is operating at 100% power -A loss of Instrument Air is in progress -At 1015, the crew implemented AOP-017, Loss of Instrument Air -Instrument Air pressure continues to lower as follows: Time IA Pressure 1020 83 psig 1030 75 psig 1050 58 psig 1110 34 psig Which ONE of the following identifies the FIRST time at which tripping the Reactor is required lAW AOP-017? A. 1020 B. 1030 c. 1050 D. 1110 Tuesday, December 08,20094:18:12 PM 54 54. Given the following plant conditions:
A. (1) 'B' '8' ONLY (2) Auxiliary Reservoir
-The plant is operating at 100% power -A loss of Instrument Air is in progress -At 1015, the crew implemented AOP-017, Loss of Instrument Air -Instrument Air pressure continues to lower as follows: Time IA Pressure 1020 83 psig 1030 75 psig 1050 58 psig 1110 34 psig Which ONE of the following identifies the FIRST time at which tripping the Reactor is required lAW AOP-017? A. 1020 B. 1030 c. 1050 D. 1110 Tuesday, December 08,20094:18:12 PM 54
                '8' ONLY B. (1) 'B'ONlY (2) Cooling Tower Basin C. (1) 'A' AND 'B' (2) Auxiliary Reservoir D. (1) 'A' AND 'B' (2) Cooling Tower Basin Tuesday, December 08,20094:18:12 PM                                                       53
: 54. Given the following plant conditions:
        - The plant is operating at 100% power
        - A loss of Instrument Air is in progress
        - At 1015, the crew implemented AOP-017, Loss of Instrument Air
        - Instrument Air pressure continues to lower as follows:
Time     IA Pressure 1020         83 psig 1030         75 psig 1050         58 psig 1110         34 psig Which ONE of the following identifies the FIRST time at which tripping the Reactor is required lAW AOP-017?
A. 1020 B. 1030
: c. 1050 D. 1110 Tuesday, December 08,20094:18:12 PM                                                         54
: 55. Which ONE of the following describes the automatic operation of Containment Normal Purge Damper, CP-D6-1, Fan Suction Damper to AH-82-1A?
: 55. Which ONE of the following describes the automatic operation of Containment Normal Purge Damper, CP-D6-1, Fan Suction Damper to AH-82-1A?
CP-D6-1 modulates to maintain ___ _ A. flow at a programmed setpoint.
CP-D6-1 modulates to maintain _ _ __
A. flow at a programmed setpoint.
B. differential pressure at a programmed setpoint.
B. differential pressure at a programmed setpoint.
C. flow at a setpoint established using a 10 turn potentiometer.
C. flow at a setpoint established using a 10 turn potentiometer.
D. differential pressure at a setpoint established using a 10 turn potentiometer.
D. differential pressure at a setpoint established using a 10 turn potentiometer.
Tuesday, December 08, 20094:18:12 PM 55 55. Which ONE of the following describes the automatic operation of Containment Normal Purge Damper, CP-D6-1, Fan Suction Damper to AH-82-1A?
Tuesday, December 08, 20094:18:12 PM                                                   55
CP-D6-1 modulates to maintain ___ _ A. flow at a programmed setpoint.
: 56. Which ONE of the following identifies the power supplies to the 'A' and 'B' Rod Drive Orive Motor Generator (MG) sets?
B. differential pressure at a programmed setpoint.
                      'A' MG set              'B' MG set A.                   102                      1E2 B.                   1E2                      102 C.                   103                      1E3 O.                   1E3                      103 Tuesday, December 08,20094:18:12 PM                                                         56
C. flow at a setpoint established using a 10 turn potentiometer.
: 57. Given the following plant conditions:
D. differential pressure at a setpoint established using a 10 turn potentiometer.
        - The plant is operating at 90% power
Tuesday, December 08, 20094:18:12 PM 55
        - Automatic PRZ level control failed and PRZ level control is now in MANUAL
: 56. Which ONE of the following identifies the power supplies to the 'A' and 'B' Rod Drive Motor Generator (MG) sets? A. B. C. O. 'A' MG set 102 1E2 103 1E3 Tuesday, December 08,20094:18:12 PM 'B' MG set 1E2 102 1E3 103 56 56. Which ONE of the following identifies the power supplies to the 'A' and 'B' Rod Orive Motor Generator (MG) sets? A. B. C. O. 'A' MG set 102 1E2 103 1E3 Tuesday, December 08,20094:18:12 PM 'B' MG set 1E2 102 1E3 103 56
        - PRZ level is stable at 50%
: 57. Given the following plant conditions:  
Which ONE of the following choices correctly completes the statements below?
-The plant is operating at 90% power -Automatic PRZ level control failed and PRZ level control is now in MANUAL -PRZ level is stable at 50% Which ONE of the following choices correctly completes the statements below? Based on these conditions PRZ level should be returned to (1) . Per the FSAR the basis for this level is to (2) following a Reactor trip. A. (1) 56.5% (2) ensure PRZ heaters remain covered B. (1) 56.5% (2) prevent letdown isolation C. (1) 54% (2) ensure PRZ heaters remain covered D. (1) 54% (2) prevent letdown isolation Tuesday. December 08.20094:18:12 PM 57 57. Given the following plant conditions:  
Based on these conditions PRZ level should be returned to (1) .
-The plant is operating at 90% power -Automatic PRZ level control failed and PRZ level control is now in MANUAL -PRZ level is stable at 50% Which ONE of the following choices correctly completes the statements below? Based on these conditions PRZ level should be returned to (1) . Per the FSAR the basis for this level is to (2) following a Reactor trip. A. (1) 56.5% (2) ensure PRZ heaters remain covered B. (1) 56.5% (2) prevent letdown isolation C. (1) 54% (2) ensure PRZ heaters remain covered D. (1) 54% (2) prevent letdown isolation Tuesday, December 08,20094:18:12 PM 57
Per the FSAR the basis for this level is to (2)    following a Reactor trip.
: 58. Given the following plant conditions:
A.    (1) 56.5%
-At 1000 An automatic Reactor Trip occurred Multiple rod bottom lights are NOT lit -At 1005 Power Range channels indicate 3% power Intermediate Range SUR channneis are at 0 DPM and stable Which ONE of the following choices correctly completes the statement below? The current condition of the Reactor lAW FRP-S.1 is (1) AND the preferred source of water lAW with AOP-002, Emergency Boration is from the (2) A. (1) subcritical (2) RWST B. (1) subcritical (2) BAT C. (1) critical (2) RWST D. ( 1) critical (2) BAT Tuesday, December 08,20094:18:12 PM 58 58. Given the following plant conditions:  
(2) ensure PRZ heaters remain covered B. (1) 56.5%
-At 1000 An automatic Reactor Trip occurred Multiple rod bottom lights are NOT lit -At 1005 Power Range channels indicate 3% power Intermediate Range SUR channneis are at 0 DPM and stable Which ONE of the following choices correctly completes the statement below? The current condition of the Reactor lAW FRP-S.1 is (1) AND the preferred source of water lAW with AOP-002, Emergency Boration is from the (2) A. (1) subcritical (2) RWST B. (1) subcritical (2) BAT c. (1) critical (2) RWST D. (1) critical (2) BAT Tuesday, December 08,20094:18:12 PM 58
(2) prevent letdown isolation C. (1) 54%
: 59. Given the following plant conditions:
(2) ensure PRZ heaters remain covered D. (1) 54%
-The plant was operating at 100% power when the Reactor Tripped -IR NI-35 did not respond as expected due to a total loss of compensating voltage -IR NI-36 responded normally Which ONE of the following describes Source Range instrument response to these conditions?
(2) prevent letdown isolation
A. BOTH SR Nls will automatically energize B. ONLY SR channel NI-31 will automatically energize C. ONLY SR channel NI-32 will automatically energize D. NEITHER SR NI will automatically energize Tuesday, December 08,20094:18:12 PM 59 59. Given the following plant conditions:
: Tuesday, Tuesday. December 08.20094:18:12 08,20094:18:12 PM                                                 57
-The plant was operating at 100% power when the Reactor Tripped -IR NI-35 did not respond as expected due to a total loss of compensating voltage -IR NI-36 responded normally Which ONE of the following describes Source Range instrument response to these conditions?
: 58. Given the following plant conditions:
A. BOTH SR N Is will automatically energize B. ONLY SR channel NI-31 will automatically energize C. ONLY SR channel NI-32 will automatically energize D. NEITHER SR NI will automatically energize Tuesday, December 08,20094:18:12 PM 59
        - At 1000 An automatic Reactor Trip occurred Multiple rod bottom lights are NOT lit
: 60. Given the following plant conditions:
        - At 1005 Power Range channels indicate 3% power Intermediate Range SUR channneis are at 0 DPM and stable Which ONE of the following choices correctly completes the statement below?
-The plant is operating at 90% power -PT -446 fails low and AOP-001, Malfunction of Rod Control and Indication System, immediate actions are completed
The current condition of the Reactor lAW FRP-S.1 is (1) AND the preferred source of water lAW with AOP-002, Emergency Boration is from the (2)
-TURBINE FIRST STAGE PRESSURE CONTROL SELECTOR switch is taken to the CHAN 447 position Which ONE of the following identifies (1) the status of the C-5, Low Power Block of Automatic Rod Withdrawal light on the Bypass Permissive Light Panel AND (2) how automatic outward rod motion would be affected if Rod Control was placed in AUTO? A. (1) illuminated (2) blocked B. (1) illuminated (2) unaffected C. (1) extinguished (2) unaffected D. (1) extinguished (2) blocked Tuesday, December 08,20094:18:12 PM 60 60. Given the following plant conditions:
A.   (1) subcritical (2) RWST B. (1) subcritical (2) BAT c.
-The plant is operating at 90% power -PT -446 fails low and AOP-001, Malfunction of Rod Control and Indication System, immediate actions are completed
C.   (1) critical (2) RWST D. (1)
-TURBINE FIRST STAGE PRESSURE CONTROL SELECTOR switch is taken to the CHAN 447 position Which ONE of the following identifies (1) the status of the C-5, Low Power Block of Automatic Rod Withdrawal light on the Bypass Permissive Light Panel AND (2) how automatic outward rod motion would be affected if Rod Control was placed in AUTO? A. (1) illuminated (2) blocked B. (1) illuminated (2) unaffected C. (1) extinguished (2) unaffected D. (1) extinguished (2) blocked Tuesday, December 08,20094:18:12 PM 60
(1) critical (2) BAT Tuesday, December 08,20094:18:12 PM                                               58
: 61. Given the following plant conditions:  
: 59. Given the following plant conditions:
-An electrical fire in the MCR has resulted in the evacuation of the MCR to the ACP -You have been directed to monitor in core thermocouple temperatures from outside the MCR per AOP-004, Remote Shutdown Which ONE of the following identifies the location of the Inadequate Core Cooling Monitor local microprocessor panel AND the method of obtaining readings at the panel? A. PIC Room C-17/19 RAB 286' using CRT monitor and keyboard.
        - The plant was operating at 100% power when the Reactor Tripped
B. PIC Room C-17/19 RAB 286' using thumbwheels set to specific points identified by a legend. C. PIC Room RAB 305' using CRT monitor and keyboard.
        - IR NI-35 did not respond as expected due to a total loss of compensating voltage
D. PIC Room RAB 305' using thumbwheels set to specific points identified by a legend. Tuesday, December 08,20094:18:12 PM 61 61. Given the following plant conditions:
        - IR NI-36 responded normally Which ONE of the following describes Source Range instrument response to these conditions?
-An electrical fire in the MCR has resulted in the evacuation of the MeR to the ACP -You have been directed to monitor in core thermocouple temperatures from outside the MCR per AOP-004, Remote Shutdown Which ONE of the following identifies the location of the Inadequate Core Cooling Monitor local microprocessor panel AND the method of obtaining readings at the panel? A. PIC Room C-17/19 RAB 286' using CRT monitor and keyboard.
A. BOTH SR N      Is will automatically energize Nls B. ONLY SR channel NI-31 will automatically energize C. ONLY SR channel NI-32 will automatically energize D. NEITHER SR NI will automatically energize Tuesday, December 08,20094:18:12 PM                                                        59
B. PIC Room C-17/19 RAB 286' using thumbwheels set to specific points identified by a legend. C. PIC Room RAB 305' using CRT monitor and keyboard.
: 60. Given the following plant conditions:
D. PIC Room RAB 305' using thumbwheels set to specific points identified by a legend. Tuesday, December 08,20094:18:12 PM 61
        - The plant is operating at 90% power
: 62. Given the following plant conditions: -A LOCA has occurred -Current containment conditions are as follows: -Containment Pressure is 3.5 psig -Containment temperature is 120°F -Hydrogen concentration is 2.0% -Containment temperature prior to the LOCA was gO°F lAW OP-125, Post Accident Hydrogen System, which ONE of the following identifies (1) the power setting for the "B" Hydrogen Recombiner AND (2) the hydrogen concentration maximum limit for Hydrogen Recombiner operation? (Reference provided)
        - PT-446 fails low and AOP-001, Malfunction of Rod Control and Indication System, immediate actions are completed
A. (1) 46.3 KW (2) 3.0% B. (1) 46.3 KW (2) 4.0% C. (1) 48.3 KW (2) 4.0% D. (1) 48.3 KW (2) 3.0% Tuesday, December 08, 20094:18:12 PM 62 62. Given the following plant conditions: -A LOCA has occurred -Current containment conditions are as follows: -Containment Pressure is 3.5 psig -Containment temperature is 120°F -Hydrogen concentration is 2.0% -Containment temperature prior to the LOCA was gO°F lAW OP-125, Post Accident Hydrogen System, which ONE of the following identifies (1) the power setting for the "B" Hydrogen Recombiner AND (2) the hydrogen concentration maximum limit for Hydrogen Recombiner operation? (Reference provided)
        - TURBINE FIRST STAGE PRESSURE CONTROL SELECTOR switch is taken to the CHAN 447 position Which ONE of the following identifies (1) the status of the C-5, Low Power Block of Automatic Rod Withdrawal light on the Bypass Permissive Light Panel AND (2) how automatic outward rod motion would be affected if Rod Control was placed in AUTO?
A. (1) 46.3 KW (2) 3.0% B. (1) 46.3KW (2) 4.0% C. (1) 48.3 KW (2) 4.0% D. (1) 48.3 KW (2) 3.0% Tuesday, December 08,20094:18:12 PM 62
A. (1) illuminated (2) blocked B. (1) illuminated (2) unaffected C. (1) extinguished (2) unaffected D. (1) extinguished (2) blocked Tuesday, December 08,20094:18:12 PM                                                       60
: 63. What is the initial impact of the 'B' Steam Generator MSIV closing when the plant is operating at 30% power on the following parameters?
: 61. Given the following plant conditions:
'A' SG Steam Flow 'B' SG Level A. rises rises B. rises lowers C. stays the same rises D. stays the same lowers Tuesday, December 08,20094:18:12 PM 63 63. What is the initial impact of the 'B' Steam Generator MSIV closing when the plant is operating at 30% power on the following parameters?
      - An electrical fire in the MCR has resulted in the evacuation of the MeR MCR to the ACP
'A' SG Steam Flow 'B' SG Level A. rises rises B. rises lowers C. stays the same rises D. stays the same lowers Tuesday, December 08,20094:18:12 PM 63
      - You have been directed to monitor in core thermocouple temperatures from outside the MCR per AOP-004, Remote Shutdown Which ONE of the following identifies the location of the Inadequate Core Cooling Monitor local microprocessor panel AND the method of obtaining readings at the panel?
: 64. Given the following plant conditions: -A plant shutdown and cooldown to Cold Shutdown is in progress -Tavg is 551°F and stablizing
A. PIC Room C-17/19 RAB 286' using CRT monitor and keyboard.
-The BOP identifies the Steam Dumps have closed -Both steam dump interlock selector switches are taken to BYPASS and then back to ON -The Bypass Permissive light "Low-Low Tavg Steam Dump Block (P-12) Bypassed" light is ON -The 'B' train P-12 did NOT bypass Which ONE of the following choices identifies how Steam Dumps will operate during these conditions?
B. PIC Room C-17/19 RAB 286' using thumbwheels set to specific points identified by a legend.
A. ONLY three condenser Steam Dump valves can still be opened B. All six condenser Steam Dump valves can be opened C. All six condenser and all six atmospheric Steam Dump valves can be opened D. None of the Steam Dumps can be opened Tuesday, December 08,20094:18:12 PM 64 64. Given the following plant conditions: -A plant shutdown and cooldown to Cold Shutdown is in progress -Tavg is 551°F and stablizing
C. PIC Room RAB 305' using CRT monitor and keyboard.
-The BOP identifies the Steam Dumps have closed -Both steam dump interlock selector switches are taken to BYPASS and then back to ON -The Bypass Permissive light "Low-Low Tavg Steam Dump Block (P-12) Bypassed" light is ON -The 'B' train P-12 did NOT bypass Which ONE of the following choices identifies how Steam Dumps will operate during these conditions?
D. PIC Room RAB 305' using thumbwheels set to specific points identified by a legend.
A. ONLY three condenser Steam Dump valves can still be opened B. All six condenser Steam Dump valves can be opened C. All six condenser and all six atmospheric Steam Dump valves can be opened D. None of the Steam Dumps can be opened Tuesday, December 08,20094:18:12 PM 64
Tuesday, December 08,20094:18:12 PM                                                        61
: 65. The plant is operating at 75% power when the 'B' Condensate Pump trips. Which ONE of the following identifies the expected response of the Condensate Booster Pumps (CBP) and Main Feedwater Pumps (MFPs)? A. ONLY 'B' CBP will trip B. ONLY 'B' MFP will trip C. 'B' CBP and 'B' MFP will trip D. No CBPs or MFPs will tip Tuesday, December 08,20094:18:12 PM 65 65. The plant is operating at 75% power when the 'B' Condensate Pump trips. Which ONE of the following identifies the expected response of the Condensate Booster Pumps (CBP) and Main Feedwater Pumps (MFPs)? A. ONLY 'B' CBP will trip B. ONLY 'B' MFP will trip C. 'B' CBP and 'B' MFP will trip D. No CBPs or MFPs will tip Tuesday, December 08,20094:18:12 PM 65
: 62. Given the following plant conditions:
: 66. Given the following plant conditions: -A Reactor Trip and Safety Injection have occurred from 100% power -The crew is performing PATH-1 -Containment pressure is 3.1 psig -'A' SG NR level is increasing in an uncontrolled manner Which ONE of the following identifies (1) the required 'A' SG NR level to isolate AFW to the 'A' SG AND (2) which Auxiliary Feedwater valves PATH-1 would direct to be shut FIRST? A. (1) 25% NR level (2) 1AF-55 and 1AF-137, Aux FW 'A' Isolations B. (1) 25% NR level (2) 1AF-49 and 1AF-129, Aux FW 'A' Flow Control Valves C. (1) 40% NR level (2) 1AF-49 and 1AF-129, Aux FW 'A' Flow Control Valves D. (1) 40% NR level (2) 1AF-55 and 1AF-137, Aux FW 'A' Isolations Tuesday, December 08,20094:18:12 PM 66 66. Given the following plant conditions:
        - A LOCA has occurred
-A Reactor Trip and Safety Injection have occurred from 100% power -The crew is performing PATH-1 -Containment pressure is 3.1 psig -'A' SG NR level is increasing in an uncontrolled manner Which ONE of the following identifies (1) the required 'A' SG NR level to isolate AFW to the 'A' SG AND (2) which Auxiliary Feedwater valves PATH-1 would direct to be shut FIRST? A. (1) 25% NR level (2) 1AF-55 and 1AF-137, Aux FW 'A' Isolations B. (1) 25% NR level (2) 1AF-49 and 1AF-129, Aux FW 'A' Flow Control Valves C. (1) 40% NR level (2) 1AF-49 and 1AF-129, Aux FW 'A' Flow Control Valves D. (1) 40% NR level (2) 1AF-55 and 1AF-137, Aux FW 'A' Isolations Tuesday, December 08, 2009 4:18:12 PM 66
        - Current containment conditions are as follows:
: 67. The plant is operating at 100% power. Which ONE of the following will result in annunciators being communicated using Transient Annunciator Response without further direction from the CRS/SM lAW OPS-NGGC-1000, Fleet Conduct of Operations?
                - Containment Pressure is 3.5 psig
A. Power Range N-43 failing high B. 'A' SG Channel 1 Level Indication failing low C. Pressurizer L T -459 failing low with PZR Level Selector in 459/460 D. 'A' EDG tripping during the performance of OP-155, Diesel Generator Emergency Power System Tuesday, December 08,20094:18:12 PM 67 67. The plant is operating at 100% power. Which ONE of the following will result in annunciators being communicated using Transient Annunciator Response without further direction from the CRS/SM lAW OPS-NGGC-1000, Fleet Conduct of Operations?
                - Containment temperature is 120°F
A. Power Range N-43 failing high B. 'A' SG Channel 1 Level Indication failing low C. Pressurizer L T -459 failing low with PZR Level Selector in 459/460 D. 'A' EDG tripping during the performance of OP-155, Diesel Generator Emergency Power System Tuesday, December 08, 2009 4:18:12 PM 67
                - Hydrogen concentration is 2.0%
: 68. With the plant operating in Mode 1, which ONE of the following requires INDEPENDENT verification instead of CONCURRENT verification?
        - Containment temperature prior to the LOCA was gO°F lAW OP-125, Post Accident Hydrogen System, which ONE of the following identifies (1) the power setting for the "B" Hydrogen Recombiner AND (2) the hydrogen concentration maximum limit for Hydrogen Recombiner operation?
A. Installing a jumper in PIC-02 for a surveillance test B. Lifting leads in Rod Control Power Cabinet 1 BD for troubleshooting C. Removal of control power fuses for a clearance on RHR pump 1 B-SB D. Performance of PIC portions of OWP-RP due to the failure of PRZ PT -455 Tuesday, December 08,20094:18:12 PM 68 68. With the plant operating in Mode 1, which ONE of the following requires INDEPENDENT verification instead of CONCURRENT verification?
(Reference provided)
A. Installing a jumper in PIC-02 for a surveillance test B. Lifting leads in Rod Control Power Cabinet 1 BD for troubleshooting C. Removal of control power fuses for a clearance on RHR pump 1 B-SB D. Performance of PIC portions of OWP-RP due to the failure of PRZ PT -455 Tuesday, December 08,20094:18:12 PM 68
A.   (1) 46.3 KW (2) 3.0%
B.   (1) 46.3 46.3KWKW (2) 4.0%
C. (1) 48.3 KW (2) 4.0%
D. (1) 48.3 KW (2) 3.0%
Tuesday, December 08,20094:18:12 08, 20094:18:12 PM                                                  62
: 63. What is the initial impact of the 'B' Steam Generator MSIV closing when the plant is operating at 30% power on the following parameters?
          'A' SG Steam Flow                'B' SG Level A. rises                            rises B. rises                            lowers C. stays the same                    rises D. stays the same                    lowers Tuesday, December 08,20094:18:12 PM                                                        63
: 64. Given the following plant conditions:
        - A plant shutdown and cooldown to Cold Shutdown is in progress
        - Tavg is 551°F and stablizing
        - The BOP identifies the Steam Dumps have closed
        - Both steam dump interlock selector switches are taken to BYPASS and then back to ON
        - The Bypass Permissive light "Low-Low Tavg Steam Dump Block (P-12) Bypassed" light is ON
        - The 'B' train P-12 did NOT bypass Which ONE of the following choices identifies how Steam Dumps will operate during these conditions?
A. ONLY three condenser Steam Dump valves can still be opened B. All six condenser Steam Dump valves can be opened C. All six condenser and all six atmospheric Steam Dump valves can be opened D. None of the Steam Dumps can be opened Tuesday, December 08,20094:18:12 PM                                                      64
: 65. The plant is operating at 75% power when the 'B' Condensate Pump trips.
Which ONE of the following identifies the expected response of the Condensate Booster Pumps (CBP) and Main Feedwater Pumps (MFPs)?
A. ONLY 'B' CBP will trip B. ONLY 'B' MFP will trip C. 'B' CBP and 'B' MFP will trip D. No CBPs or MFPs will tip Tuesday, December 08,20094:18:12 PM                                                 65
: 66. Given the following plant conditions:
        - A Reactor Trip and Safety Injection have occurred from 100% power
        - The crew is performing PATH-1
        - Containment pressure is 3.1 psig
        - 'A' SG NR level is increasing in an uncontrolled manner Which ONE of the following identifies (1) the required 'A' SG NR level to isolate AFW to the 'A' SG AND (2) which Auxiliary Feedwater valves PATH-1 would direct to be shut FIRST?
A. (1) 25% NR level (2) 1AF-55 and 1AF-137, Aux FW 'A' Isolations B. (1) 25% NR level (2) 1AF-49 and 1AF-129, Aux FW 'A' Flow Control Valves C. (1) 40% NR level (2) 1AF-49 and 1AF-129, Aux FW 'A' Flow Control Valves D. (1) 40% NR level (2) 1AF-55 and 1AF-137, Aux FW 'A' Isolations Tuesday, December 08,20094:18:12 08, 2009 4:18:12 PM                                                      66
: 67. The plant is operating at 100% power.
Which ONE of the following will result in annunciators being communicated using Transient Annunciator Response without further direction from the CRS/SM lAW OPS-NGGC-1000, Fleet Conduct of Operations?
A. Power Range N-43 failing high B. 'A' SG Channel 1 Level Indication failing low C. Pressurizer LT -459 failing low with PZR Level Selector in 459/460 D. 'A' EDG tripping during the performance of OP-155, Diesel Generator Emergency Power System 08, 2009 4:18:12 PM Tuesday, December 08,20094:18:12                                                     67
: 68. With the plant operating in Mode 1, which ONE of the the following requires INDEPENDENT verification instead of CONCURRENT verification?
A. Installing a jumper in PIC-02 for a surveillance test B. Lifting leads in Rod Control Power Cabinet 1BD for troubleshooting C. Removal of control power fuses for a clearance on RHR pump 1B-SB D. Performance of PIC portions of OWP-RP due to the failure of PRZ PT-455 Tuesday, December 08,20094:18:12 PM                                               68
: 69. What Technical Specification OPERATIONAL MODE is the plant in with RCS temperature being maintained at 375°F AND how many CSIPs are required to be operable?
: 69. What Technical Specification OPERATIONAL MODE is the plant in with RCS temperature being maintained at 375°F AND how many CSIPs are required to be operable?
The plant is in Mode (a) AND there must be at least (b) CSIP(s) operable.
The plant is in Mode       (a) AND there must be at least (b) CSIP(s) operable.
A. (a) 3 (b) 1 B. (a) 4 (b) 1 C. (a) 4 (b) 2 D. (a) 3 (b) 2 Tuesday, December 08,20094:18:12 PM 69 69. What Technical Specification OPERATIONAL MODE is the plant in with RCS temperature being maintained at 375°F AND how many CSIPs are required to be operable?
A. (a) 3 (b) 1 B. (a) 4 (b) 1 C. (a) 4 (b) 2 D. (a) 3 (b) 2 Tuesday, December 08,20094:18:12 PM                                                   69
The plant is in Mode (a) AND there must be at least (b) CSIP(s) operable.
: 70. Given the following plant conditions:
A. (a) 3 (b) 1 B. (a) 4 (b) 1 C. (a) 4 (b) 2 D. (a) 3 (b) 2 Tuesday, December 08,20094:18:12 PM 69
REM-01SW-3500A,
: 70. Given the following plant conditions:  
        - REM-01  SW-3500A, SW from WPB to Circ Water radiation monitor is in alarm
-REM-01 SW-3500A, SW from WPB to Circ Water radiation monitor is in alarm -Chemistry sample verifies high activity in the piping monitored by REM-01SW-3500A Which ONE of the following describes the impact on the release in progress AND the action required lAW AOP-005, Radiation Monitoring System? A. The release will be automatically terminated Start the standby train of ESW and place the running train of ESW in standby B. The release will be automatically terminated Direct the Radwaste Operator to isolate WPB equipment C. The release will NOT be automatically terminated Start the standby train of ESW and place the running train of ESW in standby D. The release will NOT be automatically terminated Direct the Radwaste Operator to isolate WPB equipment Tuesday, December 08,20094:18:12 PM 70 70. Given the following plant conditions:
        - Chemistry sample verifies high activity in the piping monitored by REM-01SW-3500A Which ONE of the following describes the impact on the release in progress AND the action required lAW AOP-005, Radiation Monitoring System?
-REM-01SW-3500A, SW from WPB to Circ Water radiation monitor is in alarm -Chemistry sample verifies high activity in the piping monitored by REM-01SW-3500A Which ONE of the following describes the impact on the release in progress AND the action required lAW AOP-005, Radiation Monitoring System? A. The release will be automatically terminated Start the standby train of ESW and place the running train of ESW in standby B. The release will be automatically terminated Direct the Radwaste Operator to isolate WPB equipment C. The release will NOT be automatically terminated Start the standby train of ESW and place the running train of ESW in standby D. The release will NOT be automatically terminated Direct the Radwaste Operator to isolate WPB equipment Tuesday, December 08,20094:18:12 PM 70
A. The release will be automatically terminated Start the standby train of ESW and place the running train of ESW in standby B. The release will be automatically terminated Direct the Radwaste Operator to isolate WPB equipment C. The release will NOT be automatically terminated Start the standby train of ESW and place the running train of ESW in standby D. The release will NOT be automatically terminated Direct the Radwaste Operator to isolate WPB equipment Tuesday, December 08,20094:18:12 PM                                                     70
: 71. Given the following plant conditions:  
: 71. Given the following plant conditions:
-Fuel handling operations are in progress -Several Fuel Handling Building (FHB) area radiation monitors on both trains show increasing radiation levels -ONE 'A' train channel has reached its high alarm setpoint Based on these plant conditions, the FHB Operating Floor Supply Fans (AH-56, AH-57, AH-58, AH-59) will be (1) AND FHB Emergency Exhaust Fan E-13 will be (2) A. (1) running (2) secured B. (1) running (2) running C. (1) secured (2) running D. (1) secured (2) secured Tuesday, December 08,20094:18:12 PM 71 71. Given the following plant conditions:
        - Fuel handling operations are in progress
-Fuel handling operations are in progress -Several Fuel Handling Building (FHB) area radiation monitors on both trains show increasing radiation levels -ONE 'A' train channel has reached its high alarm setpoint Based on these plant conditions, the FHB Operating Floor Supply Fans (AH-56, AH-57, AH-58, AH-59) will be (1) AND FHB Emergency Exhaust Fan E-13 will be (2) A. (1) running (2) secured B. (1) running (2) running C. (1) secured (2) running D. (1) secured (2) secured Tuesday, December 08,20094:18:12 PM 71
        - Several Fuel Handling Building (FHB) area radiation monitors on both trains show increasing radiation levels
        - ONE 'A' train channel has reached its high alarm setpoint Based on these plant conditions, the FHB Operating Floor Supply Fans (AH-56, AH-57, AH-58, AH-59) will be (1) AND FHB Emergency Exhaust Fan E-13 will be (2)
A.   (1) running (2) secured B. (1) running (2) running C. (1) secured (2) running D. (1) secured (2) secured Tuesday, December 08,20094:18:12 PM                                                       71
: 72. With the plant at power, as a member of Operations, which ONE of the following tasks would require utilization of a Special RWP in order for you to complete the activity?
: 72. With the plant at power, as a member of Operations, which ONE of the following tasks would require utilization of a Special RWP in order for you to complete the activity?
A. Entry into a High Radiation Area to evaluate boric acid deposits B. Entry into a Locked High Radiation Area to hang a clearance C. Entry into Containment to inspect for ReS leakage on CNMT Level 221 D. Entry into an area with loose surface contamination at 2500 dpm/100cm 2 to perform a valve line-up Tuesday, December 08,20094:18:12 PM 72 72. With the plant at power, as a member of Operations, which ONE of the following tasks would require utilization of a Special RWP in order for you to complete the activity?
A. Entry into a High Radiation Area to evaluate boric acid deposits B. Entry into a Locked High Radiation Area to hang a clearance C. Entry into Containment to inspect for ReS RCS leakage on CNMT Level 221 dpm/1 00cm 2 to D. Entry into an area with loose surface contamination at 2500 dpm/100cm perform a valve line-up Tuesday, December 08,20094:18:12 PM                                                         72
A. Entry into a High Radiation Area to evaluate boric acid deposits B. Entry into a Locked High Radiation Area to hang a clearance C. Entry into Containment to inspect for RCS leakage on CNMT Level 221 D. Entry into an area with loose surface contamination at 2500 dpm/1 00cm 2 to perform a valve line-up Tuesday, December 08,20094:18:12 PM 72
: 73. During a plant startup with power at 8%, which ONE of the following conditions requires entry into PATH-1?
: 73. During a plant startup with power at 8%, which ONE of the following conditions requires entry into PATH-1? A. Pressurizer Level exceeds 92% B. One Reactor Coolant Pump trips C. Pressurizer Pressure exceeds 2385 psig D. All turbine governor and throttle valves close Tuesday, December 08,20094:18:12 PM 73 73. During a plant startup with power at 8%, which ONE of the following conditions requires entry into PATH-1? A. Pressurizer Level exceeds 92% B. One Reactor Coolant Pump trips C. Pressurizer Pressure exceeds 2385 psig D. All turbine governor and throttle valves close Tuesday, December 08,20094:18:12 PM 73
A. Pressurizer Level exceeds 92%
B. One Reactor Coolant Pump trips C. Pressurizer Pressure exceeds 2385 psig D. All turbine governor and throttle valves close Tuesday, December 08,20094:18:12 PM                                                       73
: 74. FRP-H.1, "Response to Loss of Secondary Heat Sink," is in progress in response to a RED Heat Sink condition.
: 74. FRP-H.1, "Response to Loss of Secondary Heat Sink," is in progress in response to a RED Heat Sink condition.
T.he crew is progressing through FRP-H.1 when critical safety function status tree conditions are reported as follows: -Subcriticality:
The crew is progressing through FRP-H.1 when critical safety function status tree T.he conditions are reported as follows:
Orange -Core Cooling: Green -Heat Sink: Yellow -Integrity:
        - Subcriticality: Orange
Green -Containment:
        - Core Cooling: Green
Red -Inventory:
        - Heat Sink: Yellow
Yellow Which ONE of the following describes the actions the crew should take in response to the conditions given above? A. Complete FRP-H.1, then transition to FRP-J.1. B. Complete FRP-H.1, then transition to FRP-S.1. C. Immediately exit FRP-H.1 and transition to FRP-S.1. D. Immediately exit FRP-H.1 and transition to FRP-J.1. Tuesday, December 08,20094:18:12 PM 74 74. FRP-H.1, "Response to Loss of Secondary Heat Sink," is in progress in response to a RED Heat Sink condition.
        - Integrity: Green
The crew is progressing through FRP-H.1 when critical safety function status tree conditions are reported as follows: -Subcriticality:
        - Containment: Red
Orange -Core Cooling: Green -Heat Sink: Yellow -Integrity:
        - Inventory: Yellow Which ONE of the following describes the actions the crew should take in response to the conditions given above?
Green -Containment:
A. Complete FRP-H.1, then transition to FRP-J.1.
Red -Inventory:
B. Complete FRP-H.1, then transition to FRP-S.1.
Yellow Which ONE of the following describes the actions the crew should take in response to the conditions given above? A. Complete FRP-H.1, then transition to FRP-J.1. B. Complete FRP-H.1, then transition to FRP-S.1. C. Immediately exit FRP-H.1 and transition to FRP-S.1. D. Immediately exit FRP-H.1 and transition to FRP-J.1. Tuesday, December 08,20094:18:12 PM 74
C. Immediately exit FRP-H.1 and transition to FRP-S.1.
: 75. Given the following plant conditions: -A startup is in progress with Reactor power at 7% -The Main Turbine is at 1800 RPM -The 'A' and 'B' CW pumps have just tripped -Condenser Zone 1 pressure is 4.5 inches Hg absolute -Condenser Zone 2 pressure is 5.1 inches Hg absolute Based on current plant conditions, the crew should implement (1) and (2) A. (1) AOP-012, Partial Loss of Condenser Vacuum (2) Manually trip the turbine B. (1) AOP-012, Partial Loss of Condenser Vacuum (2) Verify automatic turbine trip C. (1) AOP-006, Turbine Generator Trouble (2) Manually trip the turbine D. (1) AOP-006, Turbine Generator Trouble (2) Verify automatic turbine trip You have completed the testl Tuesday, December 08,20094:18:12 PM 75 75. Given the following plant conditions: -A startup is in progress with Reactor power at 7% -The Main Turbine is at 1800 RPM -The 'A' and 'B' CW pumps have just tripped -Condenser Zone 1 pressure is 4.5 inches Hg absolute -Condenser Zone 2 pressure is 5.1 inches Hg absolute Based on current plant conditions, the crew should implement (1) and (2) A. (1) AOP-O 12, Partial Loss of Condenser Vacuum (2) Manually trip the turbine B. (1) AOP-012, Partial Loss of Condenser Vacuum (2) Verify automatic turbine trip C. (1) AOP-006, Turbine Generator Trouble (2) Manually trip the turbine D. (1) AOP-006, Turbine Generator Trouble (2) Verify automatic turbine trip You have completed the testl Tuesday, December 08, 20094:18:12 PM 75 References provide to applicants for the 2009-302 NRC written exam: RO test: Question # 2 Steam Tables Question # 3 Steam Tables Question # 21 AOP-001 Attachment 2 pages 41-43 (Rev. 34) Question # 51 Curve O-X-20 (Rev. 1) Question # 62 OP-125 Attachment 6 page 51 (Rev. 22) SRO test: Question # 85 EAL Flow path sides 1 and 2, EP-EAL pages 25,28,44, and 46 (Rev. 7) Question # 87 PLP-114 page 8 (Rev. 21) References provide to applicants for the 2009-302 NRC written exam: RO test: Question # 2 Steam Tables Question # 3 Steam Tables Question # 21 AOP-001 Attachment 2 pages 41-43 (Rev. 34) Question # 51 Curve O-X-20 (Rev. 1) Question # 62 OP-125 Attachment 6 page 51 (Rev. 22) SRO test: Question # 85 EAL Flow path sides 1 and 2, EP-EAL pages 25, 28, 44, and 46 (Rev. 7) Question # 87 PLP-114 page 8 (Rev. 21)  
D. Immediately exit FRP-H.1 and transition to FRP-J.1.
Tuesday, December 08,20094:18:12 PM                                                       74
: 75. Given the following plant conditions:
      - A startup is in progress with Reactor power at 7%
      - The Main Turbine is at 1800 RPM
        - The 'A' and 'B' CW pumps have just tripped
        - Condenser Zone 1 pressure is 4.5 inches Hg absolute
        - Condenser Zone 2 pressure is 5.1 inches Hg absolute Based on current plant conditions, the crew should implement (1) and (2)
A.   (1) AOP-O AOP-012,12, Partial Loss of Condenser Vacuum (2) Manually trip the turbine B. (1) AOP-012, Partial Loss of Condenser Vacuum (2) Verify automatic turbine trip C. (1) AOP-006, Turbine Generator Trouble (2) Manually trip the turbine D. (1) AOP-006, Turbine Generator Trouble (2) Verify automatic turbine trip You have completed the testl Tuesday, December 08,20094:18:12 08, 20094:18:12 PM                                           75
 
References provide to applicants for the 2009-302 NRC written exam:
RO test:
Question # 2   Steam Tables Question # 3   Steam Tables Question # 21 AOP-001 Attachment 2 pages 41-43 (Rev. 34)
Question # 51 Curve O-X-20 (Rev. 1)
Question # 62 OP-125 Attachment 6 page 51 (Rev. 22)
SRO test:
Question # 85 EAL Flow path sides 1 and 2, EP-EAL pages 25,28,44, 25, 28, 44, and 46 (Rev. 7)
Question # 87   PLP-114 page 8 (Rev. 21)
 
                            ~PnQf2tS2001-
                            ~rw{2.l.S  2001- 302 30Z ANSWER KEY REPORT for 2009B NRC RO Rev Final Test Form: 0
                                                              --~----.-~---
                                                              ~~~--- .. Answers -------..
                                                                                    ~~-----~----~---~
                                                                                              ---~
~-----,---~-;-
~----.------                                      .
                                            -----.--~-~--~
                                                  ~.--~-.-.--
#     ID                                      .Points  Type 0 1      2009B NRC RO 1                               l.00 MCS  C 2      2009B NRC RO 2                               l.00 1.00 MCS  D 3      2009B NRC RO 3                              1.00 l.00 MCS  A 4      2009B NRC RO 4                              1.00 l.00 MCS  C 5      2009B NRC RO 5                              1.00 l.00 MCS  C 6      2009B NRC RO 6                              l.00 MCS  B 7      2009B NRC RO 7                              1.00 l.00 MCS  B 8      2009B NRC RO 8                              l.00 MCS  D 9      2009B NRC RO 9                              1.00 l.00 MCS  B 10    2009B NRC RO 10                              l.00 MCS  B 11 11    2009B NRC RO 11                              1.00 l.00 MCS  C 12    2009B NRC RO 12                              1.00 l.00 MCS  B 13    2009B NRC RO 13                              l.00 MCS  B 14    2009B NRC RO 14                            -1.00 l.00 MCS  B 15    2009B NRC RO 15                              l.00 MCS  C 16    2009B NRC RO 16                              1.00 l.00 MCS  A 17    2009B NRC RO 17                              l.00 MCS  D 18    2009B NRC RO 18                              l.00 1.00 MCS  A 19    2009B NRC RO 19                              1.00 l.00 MCS  C 20    2009B NRC RO 20                              1.00 l.00 MCS  B 21    2009B NRC RO 21                              1.00 l.00 MCS  B 22    2009B NRC RO 22                              1.00 l.00 MCS  C 23    2009B NRC RO 23                              1.00 MCS  B 24    2009B NRC RO 24                              1.00 MCS  C 25    2009B NRC RO 25                             l.00 1.00 MCS  B 26    2009B NRC RO 26                              l.00 MCS  A 27    2009B NRC RO 27                              1.00 MCS  A 28    2009B NRC RO 28                             l.00 MCS  A 29    2009B NRC RO 29                              1.00 MCS  B 30    2009B NRC RO 30                              1.00 MCS  C 31    2009B NRC RO 31                              1.00 MCS  D 32    2009B NRC RO 32                              1.00 MCS  A 33    2009B NRC RO 33                              1.00 MCS  C 34    2009B NRC RO 34                              1.00 MCS  B 35    2009B NRC RO 35                              l.00 1.00 MCS  D 36    2009B NRC RO 36                              1.00 MCS  D 37    2009B NRC RO 37                              1.00 MCS  B 38    2009B NRC RO 38                              1.00 MCS  B 39    2009B NRC RO 39                              l.00 1.00 MCS  D 40    2009B NRC RO 40                              1.00 MCS  B 41    2009B NRC RO 41                              1.00 MCS  A 42    2009B NRC RO 42                              1.00 MCS  B 43    2009B NRC RO 43                              l.00 MCS  D 44    2009B NRC RO 44                             l.00 1.00 MCS  D 45    2009B NRC RO 45                              l.00 1.00 MCS  C 46    2009B NRC RO 46                             1.00 l.00 MCS  B 47    2009B NRC RO 47                              1.00 MCS B Tuesday, December 08,20094:19:35 08, 2009 4:19:35 PM                                                      1


30Z ANSWER KEY REPORT for 2009B NRC RO Rev Final Test Form: 0  
ANSWER KEY REPORT for 2009B NRC RO Rev Final Test Form: 0
.. Answers -------.. .
                                                            -.-.~---.--- Answers*. - - - -....._ - - -
# ID . Points Type 0 1 2009B NRC RO 1 l.00 MCS C 2 2009B NRC RO 2 1.00 MCS D 3 2009B NRC RO 3 1.00 MCS A 4 2009B NRC RO 4 1.00 MCS C 5 2009B NRC RO 5 1.00 MCS C 6 2009B NRC RO 6 l.00 MCS B 7 2009B NRC RO 7 1.00 MCS B 8 2009B NRC RO 8 l.00 MCS D 9 2009B NRC RO 9 1.00 MCS B 10 2009B NRC RO 10 l.00 MCS B 11 2009B NRC RO 11 1.00 MCS C 12 2009B NRC RO 12 1.00 MCS B 13 2009B NRC RO 13 l.00 MCS B 14 2009B NRC RO 14 -1.00 MCS B 15 2009B NRC RO 15 l.00 MCS C 16 2009B NRC RO 16 1.00 MCS A 17 2009B NRC RO 17 l.00 MCS D 18 2009B NRC RO 18 1.00 MCS A 19 2009B NRC RO 19 1.00 MCS C 20 2009B NRC RO 20 1.00 MCS B 21 2009B NRC RO 21 1.00 MCS B 22 2009B NRC RO 22 1.00 MCS C 23 2009B NRC RO 23 1.00 MCS B 24 2009B NRC RO 24 1.00 MCS C 25 2009B NRC RO 25 l.00 MCS B 26 2009B NRC RO 26 l.00 MCS A 27 2009B NRC RO 27 1.00 MCS A 28 2009B NRC RO 28 l.00 MCS A 29 2009B NRC RO 29 1.00 MCS B 30 2009B NRC RO 30 1.00 MCS C 31 2009B NRC RO 31 1.00 MCS D 32 2009B NRC RO 32 1.00 MCS A 33 2009B NRC RO 33 1.00 MCS C 34 2009B NRC RO 34 1.00 MCS B 35 2009B NRC RO 35 l.00 MCS D 36 2009B NRC RO 36 1.00 MCS D 37 2009B NRC RO 37 1.00 MCS B 38 2009B NRC RO 38 1.00 MCS B 39 2009B NRC RO 39 l.00 MCS D 40 2009B NRC RO 40 1.00 MCS B 41 2009B NRC RO 41 1.00 MCS A 42 2009B NRC RO 42 1.00 MCS B 43 2009B NRC RO 43 l.00 MCS D 44 2009B NRC RO 44 l.00 MCS D 45 2009B NRC RO 45 l.00 MCS C 46 2009B NRC RO 46 l.00 MCS B 47 2009B NRC RO 47 1.00 MCS B Tuesday, December 08,20094:19:35 PM 1 2001-302 ANSWER KEY REPORT for 2009B NRC RO Rev Final Test Form: 0 Answers
Answers
# ID Points Type 0 1 2009B NRC RO 1 l.00 MCS C 2 2009B NRC RO 2 l.00 MCS D 3 2009B NRC RO 3 l.00 MCS A 4 2009B NRC RO 4 l.00 MCS C 5 2009B NRC RO 5 l.00 MCS C 6 2009B NRC RO 6 l.00 MCS B 7 2009B NRC RO 7 l.00 MCS B 8 2009B NRC RO 8 l.00 MCS D 9 2009B NRC RO 9 l.00 MCS B 10 2009B NRC RO 10 l.00 MCS B 1 1 2009B NRC RO 11 l.00 MCS C 12 2009B NRC RO 12 l.00 MCS B 13 2009B NRC RO 13 l.00 MCS B 14 2009B NRC RO 14 l.00 MCS B 15 2009B NRC RO 15 l.00 MCS C 16 2009B NRC RO 16 l.00 MCS A 17 2009B NRC RO 17 l.00 MCS D 18 2009B NRC RO 18 l.00 MCS A 19 2009B NRC RO 19 l.00 MCS C 20 2009B NRC RO 20 l.00 MCS B 21 2009B NRC RO 21 l.00 MCS B 22 2009B NRC RO 22 l.00 MCS C 23 2009B NRC RO 23 1.00 MCS B 24 2009B NRC RO 24 1.00 MCS C 25 2009B NRC RO 25 1.00 MCS B 26 2009B NRC RO 26 l.00 MCS A 27 2009B NRC RO 27 1.00 MCS A 28 2009B NRC RO 28 l.00 MCS A 29 2009B NRC RO 29 1.00 MCS B 30 2009B NRC RO 30 1.00 MCS C 31 2009B NRC RO 31 1.00 MCS D 32 2009B NRC RO 32 1.00 MCS A 33 2009B NRC RO 33 1.00 MCS C 34 2009B NRC RO 34 1.00 MCS B 35 2009B NRC RO 35 1.00 MCS D 36 2009B NRC RO 36 1.00 MCS D 37 2009B NRC RO 37 1.00 MCS B 38 2009B NRC RO 38 1.00 MCS B 39 2009B NRC RO 39 1.00 MCS D 40 2009B NRC RO 40 1.00 MCS B 41 2009B NRC RO 41 1.00 MCS A 42 2009B NRC RO 42 1.00 MCS B 43 2009B NRC RO 43 l.00 MCS D 44 2009B NRC RO 44 1.00 MCS D 45 2009B NRC RO 45 1.00 MCS C 46 2009B NRC RO 46 1.00 MCS B 47 2009B NRC RO 47 1.00 MCS B Tuesday, December 08, 2009 4:19:35 PM 1 ANSWER KEY REPORT for 2009B NRC RO Rev Final Test Form: 0 Answers .----.. # ID Points Type 0 48 2009B NRC RO 48 1.00 MCS A 49 2009B NRC RO 49 1.00 MCS A 50 2009B NRC RO 50 1.00 MCS C 51 2009B NRC RO 51 1.00 MCS B 52 2009B NRC RO 52 1.00 MCS B 53 2009B NRC RO 53 1.00 MCS A 54 2009B NRC RO 54 1.00 MCS C 55 2009B NRC RO 55 1.00 MCS D 56 2009B NRC RO 56 1.00 MCS A 57 2009B NRC RO 57 1.00 MCS A 58 2009B NRC RO 58 1.00 MCS D 59 2009B NRC RO 59 1.00 MCS D 60 2009B NRC RO 60 1.00 MCS C 61 2009B NRC RO 61 1.00 MCS B 62 2009B NRC RO 62 1.00 MCS C 63 2009B NRC RO 63 l.00 MCS B 64 2009B NRC RO 64 1.00 MCS D 65 2009B NRC RO 65 1.00 MCS C 66 2009B NRC RO 66 1.00 MCS D 67 2009B NRC RO 67 1.00 MCS A 68 2009B NRC RO 68 1.00 MCS C 69 2009B NRC RO 69 1.00 MCS D 70 2009B NRC RO 70 1.00 MCS D 71 2009B NRC RO 71 1.00 MCS D 72 2009B NRC RO 72 1.00 MCS C 73 2009B NRC RO 73 1.00 MCS C 74 2009B NRC RO 74 1.00 MCS A 75 2009B NRC RO 75 1.00 MCS A Tuesday, December 08,20094:19:35 PM 2 ANSWER KEY REPORT for 2009B NRC RO Rev Final Test Form: 0 Answers* ... _---# ID Points '. Type 0 48 2009B NRC RO 48 1.00 MCS A 49 2009B NRC RO 49 1.00 MCS A 50 2009B NRC RO 50 1.00 MCS C 51 2009B NRC RO 51 1.00 MCS B 52 2009B NRC RO 52 1.00 MCS B 53 2009B NRC RO 53 1.00 MCS A 54 2009B NRC RO 54 1.00 MCS C 55 2009B NRC RO 55 1.00 MCS D 56 2009B NRC RO 56 1.00 MCS A 57 2009B NRC RO 57 1.00 MCS A 58 2009B NRC RO 58 1.00 MCS D 59 2009B NRC RO 59 1.00 MCS D 60 2009B NRC RO 60 1.00 MCS C 61 2009B NRC RO 61 1.00 MCS B 62 2009B NRC RO 62 1.00 MCS C 63 2009B NRC RO 63 1.00 MCS B 64 2009B NRC RO 64 1.00 MCS D 65 2009B NRC RO 65 1.00 MCS C 66 2009B NRC RO 66 1.00 MCS D 67 2009B NRC RO 67 1.00 MCS A 68 2009B NRC RO 68 1.00 MCS C 69 2009B NRC RO 69 1.00 MCS D 70 2009B NRC RO 70 1.00 MCS D 71 2009B NRC RO 71 1.00 MCS D 72 2009B NRC RO 72 1.00 MCS C 73 2009B NRC RO 73 1.00 MCS C 74 2009B NRC RO 74 1.00 MCS A 75 2009B NRC RO 75 1.00 MCS A Tuesday, December 08,20094:19:35 PM 2}}
#     ID                                     Points '. Type 0 48   2009B NRC RO 48                           1.00   MCS A 49   2009B NRC RO 49                           1.00   MCS A 50   2009B NRC RO 50                           1.00   MCS C 51   2009B NRC RO 51                           1.00   MCS B 52   2009B NRC RO 52                           1.00   MCS B 53   2009B NRC RO 53                           1.00   MCS A 54   2009B NRC RO 54                           1.00   MCS C 55   2009B NRC RO 55                           1.00   MCS D 56   2009B NRC RO 56                           1.00   MCS A 57   2009B NRC RO 57                           1.00   MCS A 58   2009B NRC RO 58                           1.00   MCS D 59   2009B NRC RO 59                           1.00   MCS D 60   2009B NRC RO 60                           1.00   MCS C 61   2009B NRC RO 61                           1.00   MCS B 62   2009B NRC RO 62                           1.00   MCS C 63   2009B NRC RO 63                           l.00 1.00   MCS B 64   2009B NRC RO 64                           1.00   MCS D 65   2009B NRC RO 65                           1.00   MCS C 66   2009B NRC RO 66                           1.00   MCS D 67   2009B NRC RO 67                           1.00   MCS A 68   2009B NRC RO 68                           1.00   MCS C 69   2009B NRC RO 69                           1.00   MCS D 70   2009B NRC RO 70                           1.00   MCS D 71   2009B NRC RO 71                           1.00   MCS D 72   2009B NRC RO 72                           1.00   MCS C 73   2009B NRC RO 73                           1.00   MCS C 74   2009B NRC RO 74                           1.00   MCS A 75   2009B NRC RO 75                           1.00   MCS A Tuesday, December 08,20094:19:35 PM                                                       2}}

Latest revision as of 05:52, 12 March 2020

Initial Exam 2009-302 Final RO Written Exam
ML100060485
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/05/2010
From:
NRC/RGN-II
To:
References
50-400/09-302
Download: ML100060485 (80)


Text

FACILITY NAME: Harris Nulear Plant Section 8

~O~5~OO=O~40~O~~=O~O~9-~30=2~____

REPORTNUMBER: ____~O~5~O~OO~4~O~~~2~OO~9~-3~O~2~

FINAL RO WRITTEN EXAM CONTENTS:

~inal RO Written Exam (75 'as given' questions with changes made

.,during puring administration annotated)

~eference Handouts Provided To Applicants cr~eference G

0" Answer Key

[2{

Location of Electronic Files:

By'~. :.......r~----'-.il::--t-----

Submitted B  :.....Jt'!o'~---\.,,\,.....-+----- Verified By----J.~~~::.....:::(~-+-_-

ES-401, Rev. 9 Site-Specific RO Written Examination Form ES-401-7 Cover Sheet u.s.

U.S. Nuclear Regulatory Commission Site-Specific RO Written Examination Applic~nt Information Applicant

  • I*~i:f* ,
  • '~Ci ll, Name:

Date: December 16,2009 16, 2009 Facility/Unit: Shearon Harris 2009-302 Region: II I/ III //IV I //11 IV Reactor Type: W I/ CE / BW / GE Start Time: Finish Time:

-. Instructions Use the answer sheets provided to document your answers. Staple this cover sheet on top of the answer sheets. To pass the examin.ation, examination, you you, must achieve a final grade of at least 80.00

,i" iic',j ,

Applicant Certification All work done on this examination is my own. I have neither given nor received aid.

Applicant's Signature Results Examination Value Points Applicant's Score Points Applicant's Grade Percent

1. Given the following plant conditions:

- Offsite Power has been lost

- The crew is performing EPP-004, Reactor Trip Response Which ONE of the following temperature indications would the operators use to control and stabilize temperature between 555°F and 559°F AND why?

A. Tavg To ensure adequate RCS heat removal is occurring B. Tavg To check for natural circulation established C. Tcold To ensure adequate RCS heat removal is occurring D. Tcold To check for natural circulation established Tuesday, December 08,20094:18:11 PM 1

2. Given the following plant conditions:

- A Loss of Offsite Power occurred resulting in a Reactor Trip

- ONE PRZ PORV is partially OPEN

- PRZ pressure is 1785 psig

- PRT pressure is 45 psig

- Core Exit Thermocouple temperature is 625°F

- 'A' CSIP is under clearance

- 'B' CSIP tripped on overcurrent Which ONE of the following identifies (1) the temperature indicated on the PRZ PORV Tailpipe Temperature Indicator, TI-463 AND (2) the expected PRZ level trend?

A. (1) 274°F (2) rising B. (1) 274°F (2) lowering C. (1) 293°F (2) lowering D. (1) 293°F (2) rising Tuesday, December 08,20094:18:11 PM 2

3. Given the following plant conditions:

- A Reactor Trip and Safety Injection have occurred

- EPP-009, Post LOCA Cooldown and Depressurization, is in progress

- PI-455.1, PRZ pressure, is reading 1835 psig

- PI-456, PRZ pressure, is reading 1865 psig

- PI-457, PRZ pressure, is reading 1885 psig

- The highest Core Exit Thermocouple is reading 560°F ReS Hot Leg Temperature is reading 550°F

- The highest RCS

- ERFIS is unavailable Which ONE of the following choices correctly completes the statement below?

Subcooling is monitored to (1) AND the current value of subcooling is (2)

A. (1) ensure SI reinitiation if required B. (1) prevent voiding during depressurization C. (1) ensure SI reinitiation if required D. (1) prevent voiding during depressurization Tuesday, December 08,20094:18:11 PM 3

4. Given the following plant conditions:

- A Large Break LOCA has occurred

- Foldouts A and B apply

- The crew is checking "RHR System - Capable of Cold Leg Recirculation" lAW PATH-1 The following conditions exist:

- The 'A' RHR pump tripped on overcurrent

- The 'B' train RHR containment sump suction valves, 151-301 and 151-311, are without power due to the respective MCC being de-energized

- ALB-04-2-2, REFUELING WATER STORAGE TANK LOW LEVEL has alarmed

- The Containment sump pumps failed to isolate automatically resulting in overflow of the Waste Holdup Tank and elevated WPB radiation levels Which ONE of the following identifies the correct procedure action?

A. Remain in PATH-1 B. GO to EPP-010, Transfer to Cold Leg Recirculation C. GO to EPP-012, Loss of Emergency Coolant Recirculation D. GO to EPP-013, LOCA Outside Containment Tuesday, December 08,20094:18:11 PM 4

5. Given the following plant conditions:

- The plant is operating at 45% power

- RCP 'Cc' #1 seal leakoff is 9 gpm and rising Which ONE of the following describes the correct sequence of actions that operators will perform lAW AOP~018, Reactor Coolant Pump Abnormal Conditions?

A. Trip the Reactor, secure RCP 'c' 'C' and then implement PATH-1 B. Trip the Reactor, implement PATH-1, secure RCP 'C' 'c' as time permits C. Secure RCP 'C', shut 1CS-437, 1CS-437, RCP 'C' #1 Seal Water Return and initiate a plant shutdown lAW GP-006, Normal Plant Shutdown from Power Operation to Hot Standby D. Initiate a plant shutdown lAW GP-006, Normal Plant Shutdown from Power Operation to Hot Standby, secure RCP 'C' 'c' and shut 1CS-437, RCP 'cC' #1 Seal Water Retum Return Tuesday, December 08,20094:18:11 PM 5

6. Given the following plant conditions:

- The plant is operating at 100% power

- A leak has occurred in the reference leg of Pressurizer Level Transmitter LT -459

- The leak size is insufficient to affect CNMT parameters

- PRZ Level Controller Selector switch is in the 459/461 position Which ONE of the following identifies (1) the level trend that will be displayed on LI-459 AND (2) the initial impact on Pressurizer Level Pressurizer Level Indicator L1-459 Control?

A. (1) Rising (2) NO impact because L1-461 LI-461 is controlling B. (1 ) Rising (1)

(2) FCV-122 throttles CLOSED and actual level lowers C. (1(1)) Lowering (2) Letdown isolates and actual level rises D. (1(1)) Lowering (2) FCV-122 throttles OPEN and actual level rises Tuesday, December 08,20094:18:11 PM 6

7. Given the following plant conditions:

- The plant is in Mode 5

- 'A' and 'B' RCPs are in service

- Both trains of RHR are in service for shutdown cooling

- Both ESW Headers are being supplied by NSW

- CCW is aligned to support RHR Operations

- 1CC-99 and 1CC-128, Non-Essential Header Supply and Return to 'A' Header, are SHUT The following occur:

- A large leak from CCW develops

- CCW Surge Tank level lowers to 38% on U-670A1 LI-670A1 SA and 3% on U-676A1 LI-676A1 SB Which ONE of the following identifies the location of the leak and the action required by AOP-014, Loss of Component Cooling Water?

Leak Location Action Required A. 'B' RHR HX ONLY the 'B' CCW Pump must be stopped B. 'B'CCW HX ONLY the 'B' CCW Pump must be stopped C. 'B'CCW HX The 'A' and 'B' CCW Pumps must be stopped D. 'B' RHR HX The 'A' and 'B' CCW Pumps must be stopped Tuesday, December 08,20094:18:11 PM 7

8. Given the following plant conditions:

- The plant tripped from 100% power due to PRZ PORV 1RC-116 failing open

- During the transient the following events occurred:

- 1MS-58, 'A' SG PORV failed open resulting in PRZ Level lowering to 19%

- The 'B' RCP tripped due to an electrical fault The following conditions currently exist:

- 1MS-58 is isolated and the overcooling terminated

- The block valve for 1 RC-116 is closed

- Core Exit Thermocouples are 557°F 55rF

- PRZ pressure is 2135 psig

- PRZ level is 28%

- PRZ Liquid Space temperature is 610°F Which ONE of the following describes the response of RCS pressure over the next five minutes AND the reason for the response?

will ......

RCS pressure will..

A. rise because spray flow has been reduced with the trip of 'B' RCP B. rise because PRZ heaters are raising PZR temperature C. lower because all heaters remain de-energized until manually reset D. lower because subcooled liquid insurged into the PZR Tuesday, December 08,20094:18:11 PM 8

9. Given the following plant conditions:

- The plant is operating at 7% power

- The crew is implementing AOP-01 AOP-010,0, Feedwater Malfunction Current 'A' SG levels are:

- LI-474 is 26%

- LI-475 is 22%

- LI-476 is 23%

Which ONE of the following choices identifies (1) the annunciator(s) that are expected for this condition AND (2) the required crew actions?

A. (1) SG A NR LVUSP HIILO DEV (ONLY)

(2) Continue in AOP-01 0 and restore SG levels B. (1) SG A NR LVUSP HIILO DEV and REACTOR TRIP STEAM GEN-A LOW-LOW-LEVEL (2) Trip the Reactor and enter PATH-1 C. (1) SG A NR LVUSP HIILO DEV (ONLY)

(2) Trip the Reactor and enter PATH-1 D. (1) SG A NR LVUSP HIILO DEVand REACTOR TRIP STEAM GEN-A LOW-LOW-LEVEL (2) Continue in AOP-01 0 and restore SG levels Tuesday, December 08,20094:18:11 08, 20094:18:11 PM 9

10. Given the following plant conditions:

- The plant was operating at 100% power

- A LOCA has occurred

- The crew is performing the actions of EPP-009, Post LOCA Cooldown and Depressurization The following plant conditions exist:

- AFW flow to the SGs has been secured to maintain current level

- Charging Flow is 150 gpm

- Pressurizer level is 8% and lowering

- RCS subcooling is 23°F and lowering

- The BOP reports that 'C' 'c' SG level is increasing steadily Which ONE of the following identifies the required action AND procedure transition?

A. Manually align flow through the BIT AND GO TO PATH-1, Entry Point C B. Manually align flow through the BIT AND GO TO PATH-2, Entry Point J C. Actuate Safety Injection AND GO TO PATH-2, Entry Point J.

D. Actuate Safety Injection AND GO TO PATH-1, Entry Point C Tuesday, December 08,20094:18:11 PM 10

11. Given the following plant conditions:

- The plant is in Mode 3

- GP-007, Normal Plant Cooldown Mode 3 to Mode 5, is in progress

- RCS temperature is 495°F

- RCS pressure is 1900 psig

- All SG pressures are 630 psig

- All actions required by GP-007 for present plant conditions have been completed A Steam Line Break occurs inside Containment and the following conditions exist:

- Containment is 2.7 psig and increasing

- 'A' SG pressure has decreased to 440 psig in the last 30 seconds Which ONE of the following identifies the ESFAS signals that have automatically initiated with these conditions?

A. Safety Injection and Main Steam Isolation ONLY B. Safety Injection and AFW Isolation ONLY C. Main Steam Isolation and AFW Isolation ONLY D. Safety Injection, Main Steam Isolation, and AFW Isolation Tuesday, December 08,20094:18:11 PM 11

12. Given the following plant conditions:

- A Reactor Trip occurred due to a Loss of Offsite Power

- The 'A' EDG failed to start

- The crew is performing actions of EPP-004, Reactor Trip Response

- ReS temperature lowered to 552°F but is trending to 557°F 55]DF Which ONE of the following identifies (1) the required SG PORV controller setpoint to maintain 557°F 55]DF lAW EPP-004 AND (2) the SG PORV(s) available to control ReS temperature?

A. (1) 84%

(2) '8'

'B' ONLY

8. (1) 84%

B.

'8' AND 'e' (2) 'B'

c. (1) 85%

e.

'B' AND 'c' (2) '8' 'e' D. (1) 85%

'8' ONLY (2) 'B' Tuesday, December 08,20094:18:11 PM 12

13. Given the following plant conditions:

- The plant is in Mode 6

- Core Alterations are in progress

- Source Range (SR) N32 is providing audible count rate in the MCR and CNMT

- Nuclear Flux Monitoring System (NFMS) N60 is being substituted for SR N31 Which ONE of the following identifies a condition that would require suspension of Core Alterations?

A. RWST level lowers to 23%

B. Instrument Bus IDP-1 B-SII de-energizes IDP-1B-SII C. Count rate increases by a factor of two on SR N32 ONLY D. Engineering determined that the 'B' EDG fuel oil transfer pump is inoperable Tuesday, December 08,20094:18:11 PM 13

14. The plant is at 100% power when a loss of DC Bus 1 A-SA occurs.

1A-SA Which ONE of the following choices regarding the 'A' EDG correctly completes the statement below?

The Governor and Generator Excitation circuits will be (1) and the EDG Output breaker (2) be closed from the MCB.

A. (1) de-energized (2) can B. (1) de-energized (2) can NOT C. (1) energized (2) can D. (1) energized (2) can NOT Tuesday, December 08,20094:18:11 PM 14

15. Given the following plant conditions:

- The plant is operating at 100% power

- 'B' Train Safety Equipment is in service

- Both ESW Pumps are running to support surveillance testing The following indications and annunciators are observed:

- ALB-02-4-5, SERV WTR LEAKAGE

- ALB-02-5-5, SERV WTR HEADER A HIGH/LOW FLOW

- ALB-02-6-1, SERV WTR SUPPLY HEADER A LOW PRESS

- CNMT Sump level is increasing on ERFIS The crew enters AOP-022, Loss of Service Water and secures the 'A' ESW Pump.

Which ONE of the following actions lAW AOP-022, identifies (1) the possible location of the rupture AND (2) the isolation requirement(s) for the affected component(s)?

A. (1) CNMT Fan Coil Units (2) Shut 1SW-231, NNS CNMT Fan CLRS Inlet Isol, AND 1SW-242, NNS CNMT Fan CLRS Outlet Isol B. (1) CNMT Fan Coil Units (2) Shut 1SW-231, 1SW-231, NNS CNMT Fan CLRS Inlet Isol, AND 1 SW-276, Headers 1SW-276, A&B Return to Normal Service Water C. (1) CNMT Fan Coolers (2) Shut ONLY AH-2/3 ESW Supply and Return Valves D. (1) CNMT Fan Coolers (2) Shut AH-1/2/3/4 ESW Supply and Return Valves Tuesday, December 08,20094:18:11 PM 15

16. Given the following plant conditions:

- The plant is in Mode 5

- The RCS is in solid plant operations

- The 'A' Train of RHR is in service

- The air line to HCV-142.1 (1 CS-28), RHR Letdown has been sheared during a maintenance activity Which ONE of the following choices completes the statement below?

When air is lost to HCV-142.1, RCS pressure will (1) AND lAW AOP-019, Malfunction of RCS Pressure Control, the crew must FIRST (2)

A. (1) rise (2) STOP the running Charging Pump B. (1) rise (2) OPEN 1CS-38 (PCV-145), Letdown Pressure Control Valve C. (1) lower (2) STOP the running Charging Pump D. (1) lower (2) CLOSE 1CS-38 1CS-38 (PCV-145), Letdown Pressure Control Valve Tuesday, December 08,20094:18:12 PM 16

17. Given the following plant conditions:

- A Reactor Trip and Safety Injection have occurred from 100% power

- The crew has transitioned to EPP-013, LOCA Outside Containment

- 1RH-1 and 1RH-2, RCS Loop A to RHR Pump A-SA, BOTH indicate partially OPEN Which ONE of the following identifies (1) the action required to allow shutting 1RH-1 and 1RH-2 from the MCB AND (2) the parameter used in EPP-013 to determine if this action has isolated the break?

A. (1) the control power switch must be turned ON (2) RCS pressure increasing B. (1) the control power switch must be turned ON (2) Pressurizer level increasing C. (1) the breakers for 1 RH-1 and 1 1RH-1 RH-2 must be CLOSED 1RH-2 (2) Pressurizer level increasing D. (1) the breakers for 1RH-1 and 1RH-2 must be CLOSED (2) RCS pressure increasing Tuesday, December 08,20094:18:12 PM 17

18. Given the following plant conditions:

- The plant was operating at 100% power

- 'A' MDAFW pump is out of service

- A manual Reactor Trip was initiated due to a loss of both MFPs

- The TDAFP AFW pump tripped after starting

- AFW flow control valves are full open

- Containment pressure is 3.5 psig Which ONE of the following sets of conditions would indicate that an entry into FRP-H.1, Response to Loss of Secondary Heat Sink is required?

A. Total AFW flow is 190 KPPH All SG NR levels at 38%

B. Total AFW flow is 220 KPPH

'A' and 'B' SGs NR Levels are at 24%, 'C' SG NR level is at 42%

C. Total AFW flow is 190 KPPH

'A' and 'B' SGs NR Levels are at 24%, 'C' SG NR level is at 42%

D. Total AFW flow is 220 KPPH All SG NR levels at 38%

Tuesday, December 08,20094:18:12 PM 18

19. Given the following plant conditions:

- The plant is operating at 90% power for the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

- The RCS Tref computer input to rod control has failed high Which ONE of the following identifies the INITIAL effects of the above conditions?

Reactor Power OTAT~T setpoint A. decreases decreases B. decreases increases C. increases decreases D. increases increases Tuesday, December 08,20094:18:12 PM 19

20. Given the following plant conditions:

- The plant was operating at 90% power

- One rod has dropped into the core

- Axial Flux Difference (AFD) is outside the limits specified in curve F-16-2

- QPTR is determined to be 1.10 lAW Technical Specifications, which ONE of the following identifies (1) the power reduction required to be completed within 30 minutes AND (2) the reason for the action?

A. (1)

(1 ) Reduce power to less than 50% of RTP (2) Ensure minimum Shutdown Margin is maintained (1 ) Reduce power to less than 50% of RTP B. (1)

(2) Ensure minimum Departure from Nucleate Boiling Ratio is maintained C. (1)

(1 ) Reduce power to less than 70% of RTP (2) Ensure minimum Departure from Nucleate Boiling Ratio is maintained D. (1)

(1 ) Reduce power to less than 70% of RTP (2) Ensure minimum Shutdown Margin is maintained Tuesday, December 08,20094:18:12 PM 20

21. Given the following conditions:

- The plant is operating at 100% power after completing a ramp to full power

- The RO reports that the DRPI indication for rod H14 indicates 196 steps and the group step counters indicate 218 steps

- The CRS has directed you to determine if there is a greater than 10°F difference between thermocouples adjacent to the misaligned rod and the average of the symmetric thermocouples.

H 14, one of it's ADJACENT thermocouples is (1)

For rod H14, . For this thermocouple, the SYMMETRIC thermocouple(s) to be used is/are (2)

(Reference provided)

A. (1) G15 (2) G01, R07 B. (1) H13 (2) C08, N08, H03 C. (1) G15 (2) E14,E12,E08,E10 D. (1) H13 (2) C12,H11,F11,F13,F09 Tuesday, December 08,20094:18:12 PM 21

22. Given the following plant conditions:

- The outdoor air temperature is 28°F

- The Reactor has tripped and 3 control rods are stuck at 218 steps

- The BAT temperature is 53°F

- The RWST temperature is 48°F Emergency Boration should be implemented using which ONE of the following source(s) available to perform the Emergency Boration?

A. BOTH the BAT and RWST B. ONLY the BAT

c. ONLY the RWST C.

D. NEITHER the BAT or the RWST Tuesday, December 08, 08,20094:18:12 20094:18:12 PM 22

23. Given the following plant conditions:

- The Reactor has been operating at 100 percent power for 30 days 1.5 microcuries per gram DOSE

- Chemistry reports that RCS activity is 1.5 EQUIVALENT 1-131 WHICH ONE of the following actions lAW AOP-032, High RCS Activity, will be utilized to reduce RCS activity?

A. Venting the Volume Control Tank (VCT) to the Waste Gas System.

B. Placing cation demineralizer in service.

C. Maximizing letdown through both mixed-bed demineralizers.

D. Reducing letdown to minimum and establish an RCS pH between 6.5 and 7.5 by chemical addition.

Tuesday, December 08,20094:18:12 PM 23

24. Given the following plant conditions:

- A LOCA has occurred

- RCS pressure is 1100 psig and stable

- Containment pressure rose to 2.6 psig and is currently 2.1 psig and stable

- The crew is performing actions contained in EPP-009, Post LOCA Cooldown and Depressurization Which ONE of the following describes the method that will be used to perform the cooldown of the RCS?

ReS?

Perform the cooldown cool down using ...

A. SIG PORVs at less than 100°F per hour.

B. SIG PORVs at the maximum achievable rate.

C. Condenser steam dumps at less than 100°F per hour.

D. Condenser steam dumps at maximum achievable rate.

Tuesday, December 08,20094:18:12 PM 24

25. Given the following plant conditions:

- FRP-C.2, Response to Degraded Core Cooling is in progress due to an ORANGE condition on the Core Cooling CSFST

- RCPs 'A' and 'C' are running; RCP 'B' is secured

- Both CSIPs are tripped

- The crew is about to fully depressurize all SGs to atmospheric pressure Which ONE of the following describes the appropriate actions for RCP operation from this point forward in FRP-C.2?

A. RCPs are stopped to reduce heat input into the RCS B. RCPs are stopped because number 1 seal differential pressure will be lost C. RCPs are left running to provide core cooling until ECCS flow is established D. RCPs are left running in order to sweep voids from the Reactor Vessel Head during RCS depressurization Tuesday, December 08,20094:18:12 PM 25

26. Given the following plant conditions:

- Safety Injection has inadvertently actuated on both trains

- All systems operated as designed

- The operating crew is implementing EPP-008, SI TERMINATION

- The CRS has directed that SI be reset Which ONE of the following describes the effect of operating only ONE of the two SI reset switches at this step instead of both switches?

Bypass - Permissive Light Panel Bypass - Permissive Light Panel light 5-1, light 4-1. SI ACTUATE SI RESET - AUTO SI BLOCKED A. would blink due to only one train would blink due to only one train of SSPS having an SI signal of SSPS having SI reset B. would extinguish due to neither train would blink due to only one train of SSPS having an SI signal of SSPS having SI reset C. would blink due to only one train would light due to both trains of SSPS having an SI signal of SSPS having auto SI blocked D. would extinguish due to neither train would light due to both trains of SSPS having an SI signal of SSPS having auto SI blocked Tuesday, December 08,20094:18:12 PM 26

27. The plant was operating at 100% power when a LOCA resulted in a high radiation condition inside containment

- All 4 Containment Ventilation Isolation radiation monitors are in high (RED) alarm

- Both Containment High Range Post-LOCA Radiation Monitors are in high (RED) alarm Which ONE of the following identifies components that received an automatic STOP signal?

A. AH-82 Normal Purge Supply Fans ONLY B. S-1 Airborne Radioactivity Removal Units ONLY C. BOTH AH-82 fans AND S-1 units D. NEITHER AH-82 fans OR S-1 units Tuesday, December 08,20094:18:12 PM 27

28. Which ONE of the following identifies the power supplies for the Component Cooling Water Pumps?

1A 1B A. 6.9 kV Bus 1A-SA 1A-SA 6.9 kV Bus 1B-SB B. 6.9kV Aux Bus 1A 6.9 kV Aux Bus 1B C. 480V Aux Bus 1A2-SA 480V Aux Bus 1B2-SB D. 480V Aux Bus 1A3-SA 480V Aux Bus 1B3-SB Tuesday, December 08,20094:18:12 PM 28

29. The plant is operating at 100% power when LT-11S, VCT Level, fails LOW.

- All actions of AOP-003 are completed waiting for maintanence to complete work Which ONE of the following describes how VCT level will be maintained lAW AOP-003, Malfunction of Reactor Makeup Control?

(1) When level decreases to 20%, (1)

(2) When level increases to 70%, (2)

A. (1) automatic makeup will begin raising level (2) 1CS-120 (LCV-112A), Letdown VCT/Hold Up Tank, will begin diverting letdown to the Hold Up Tank B. (1) the operator must start a manual makeup to raise VCT level (2) 1CS-120 (LCV-112A), Letdown VCT/Hold Up Tank, will begin diverting letdown to the Hold Up Tank C. (1) automatic makeup will begin raising level (2) the operator must align 1CS-120 1CS-120 (LCV-112A), Letdown VCT/Hold Up Tank, to the Hold Up Tank D. (1) the operator must start a manual makeup to raise VCT level (2) the operator must align 1CS-120 (LCV-112A), Letdown VCT/Hold Up Tank, to the Hold Up Tank Tuesday, December 08,20094:18:12 PM 29

Given the following plant conditions:

30. Given

- The plant is in Mode 6 with refueling in progress

- A clearance order has been issued requiring de-energization of 1CS-214, 1CS-214, CSIP Mini-Flow Isolation.

Which ONE of the following describes the MCC that the clearance will be applied to AND the location of this MCC?

MCC Location A.

A. 1A35-SA RAB 236 B. 1B35-SB RAB 236 C. 1A35-SA RAB 261 D. 1B35-SB RAB 261 Tuesday, December 08,20094:18:12 PM 30

31. Given the following plant conditions:

- The plant is in Mode 4

- RHR Train 'A' is in service

- 1RH-20, RHR Heat Exchanger Bypass valve is in automatic with the setpoint at 55%

atSS%

- 1RH-30, RHR Heat Exchanger Outlet valve demand position is set at 30%

- The RO reduces the setpoint of 1RH-20 to SO% 50%

Which ONE of the following describes the RHR system parameter changes from the initial steady state condition to final steady state condition?

TR-604 (RHR HX A Out Temp) FI-605A (RHR HX A HDR Flow)

FI-60SA A.

A. Higher Lower B. Higher Higher

c. Lower Higher D. Lower Lower Tuesday, December 08,20094:18:12 PM 31
32. Given the following plant conditions:

- The plant is being cooled down to 135°F for maintenance which will NOT require the RCS to be opened.

- The crew is in the process of placing the first RHR train in service for RCS cooling.

- Current boron concentrations are as follows:

- RHR (train to be placed in service) boron 1121 ppm

- Required Shutdown Margin boron 1338 ppm

- Pressurizer boron 1387 ppm

- RCS boron 1446 ppm

- Cold Shutdown boron 1682 ppm Before the RHR train can be placed in service for RCS cooling, RHR boron concentration must be increased by a MINIMUM of ...

A. 217 ppm B. 266 ppm C. 325 ppm D. 561 ppm Tuesday, December 08, 2009 4: 18: 12 PM 08,20094:18:12 32

33. Given the following plant conditions:

- A Large Break LOCA occurred 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ago

- EPP-010 Transfer to Cold Leg Recirculation has been completed

- The 'A' CSIP has just tripped Which ONE of the following correctly identifies the flow rates AFTER the 'A' CSIP trip occurrs?

The flow rate through FI-940, Alternate Header Flow will (1) and flow rate through FI-943, Normal Header Flow will (2)

A. (1) remain at zero flow (2) decrease to approximately half the previous value B. (1) decrease to approximately half the previous value (2) remain at zero flow C. (1) decrease to zero (2) remain constant D. (1) remain constant (2) decrease to zero

Tuesday, Tuesday. December 08,20094:18:12 PM 33
34. Given the following plant conditions:

- A Pressurizer steam space LOCA has occurred

- PRT pressure is currently 28 psig and increasing

- PRT level is 72% and increasing IF the present conditions continue, (1) when will the PRT high level alarm first occur AND (2) lAW OP-100, Reactor Coolant System, in order to prevent the PRT from going water solid, where will the operator transfer the PRT to?

A. (1 ) 78%

(2) the Reactor Coolant Drain Tank B. (1 ) 83%

(2) the Recycle Hold Up Tank C. (1 ) 78%

(2) the Recycle Hold Up Tank D. (1 ) 83%

(2) the Reactor Coolant Drain Tank Tuesday, December 08,20094:18:12 PM 34

3S. The plant is operating at 100% power 35.

- ALB-00S-6-1, ALB-005-6-1, CCW SURGE TANK HIGH-LOW LEVEL just actuated

- The RO confirms level at 40%, lowering slowly Which ONE of the following automatic actions must be verified lAW ALB-005-6-1?

ALB-00S-6-1?

A. CCW Drain Tank Transfer Pump has tripped B. Holdup Tank Transfer Pump has tripped C. CCW Makeup valve, DW-1S, DW-15, has opened D. GFFD and Primary Sample Panel have isolated Tuesday, December 08, 2009 4: 18: 12 PM 08,20094:18:12 3S 35

36. Given the following plant conditions:

- The plant is in Mode 3 OST-1117,

- OST -1117, Pressurizer PORV Operability Quarterly Interval Modes 3 - 6 is in progress

- One minute after opening 1RC-118, PRZ PORV PCV-445A SA, the following annunciator is received:

ALB-009-8-1, PRESSURIZER RELIEF TANK HIGH-LOW LEVEL PRESS OR TEMP

- The RO determines the annunciator is caused by high temperature in the PRT

- Attempts to close 1RC-118 are unsuccessful Assuming no operator actions, which ONE of the following correctly completes the statement below?

On decreasing PRZ pressure, the Group 'c*

'C' heaters will FIRST receive a "full on" signal when pressure reduces to (1) AND when PRT pressure is ~ (2) the PRT rupture discs will rupture.

A. (1) 2220 psig (2) 50 psig B. (1) 2210 psig (2) 100 psig C. (1) 2210 psig (2) 50 psig D. (1) 2220 psig (2) 100 psig Tuesday, December 08,20094:18:12 PM 36

37. The plant is operating at 100% power when the following occurs:

- PRZ Pressure Channel (PT-445) fails high Which ONE of the following describes the response of the PRZ Pressure Control System?

A. ONE PRZ PORV will OPEN and remain OPEN until P-11, PRZ High Pressure actuates B. TWO PRZ PORVs will OPEN and remain OPEN until P-11, PRZ High Pressure actuates C. TWO PRZ PORVs will OPEN AND remain OPEN until Safety Injection actuates D. ONE PRZ PORV will OPEN AND remain OPEN until Safety Injection actuates Tuesday, December 08,20094:18:12 PM 37

38. Given the following plant conditions:

- The plant is operating at 8% power

- Intermediate Range (IR) N35 is inoperable

- N35 Level Trip Switch is in BYPASS lAW OWP-RP-21 The following occur:

- The power supply for N35 is operating erratically

- N35 Instrument Power fuses blow

- Two minutes later N35 Control Power fuses blow Which ONE of the following identifies the expected result of these conditions?

A. The Reactor Trip Breakers OPENED when N35 Instrument Power fuses blew B. The Reactor Trip Breakers OPENED when N35 Control Power fuses blew C. With N35 in BYPASS, the Reactor Trip Breakers will remain CLOSED D. With N35 BLOCKED in SSPS, the Reactor Trip Breakers will remain CLOSED Tuesday, December 08,20094:18:12 PM 38

39. A loss of Instrument Buses and will result in the loss of A and B Train ESFAS functions driven by slave relays for that train.

A. SII Sill B. SI Sill C. SII SIV D. SI SIV 08,20094:18:12 Tuesday, December 08, 20094:18:12 PM 39

40. The plant is operating at 100% power

- Instrument Bus Sill, is de-energized and actions are being taken in accordance with AOP-024, Loss of Uninterruptible Power Supply

- PT-953, Containment Pressure Channel IV, then fails high Which ONE of the following describes the effect on the Safety Injection (SI) AND Containment Spray Actuation Signal (CSAS) systems?

SI CSAS A. Not actuated Not actuated B. Actuated Not actuated C. Not actuated Actuated D. Actuated Actuated Tuesday, December 08,20094:18:12 PM 40

41. Given the following plant conditions:

- The plant experiences a Reactor Trip and 51 SI concurrent with a L05P LOSP

- During the performance of PATH-1 Guide Attachment 6, the BOP notes the following alignment for Containment Fan Coolers:

- 'A' Train - one fan per unit running in fast speed

- 'B' Train - one fan per unit running in slow speed Based on these conditions, the BOP should ...

A. shift the two 'A' Train fans from fast to slow speed.

B. shift the two 'B' Train fans from slow to fast speed.

C. start two additional 'A' Train fans in fast speed and secure the 'B' Train fans.

D. start two additional 'B' Train fans in slow speed and secure the 'A' Train fans.

Tuesday, December 08,20094:18:12 PM 41

42. Given the following plant conditions:

- The plant was operating at 100% power when a LOCA occurred

- The crew is currently in EPP-012, Loss of Emergency Coolant Recirculation

- Containment Spray Pump 'A' tripped when Containment Spray actuated

- Containment pressure is 12 psig and rising

- RWST level is 32% and lowering Based on current plant conditions, which ONE of the following identifies the MINIMUM number of Containment Fan Coolers required to be in operation lAW EPP-012?

A.O B. 2 C. 3 D. 4 Tuesday, December 08,20094:18:12 PM 42

43. Given the following plant conditions:

- A Reactor Trip and Safety Injection have occurred

- Steam Generator parameters have decreased to the following values:

SG NRLEVEL PRESSURE A 32% 870 psig B 12% 420 psig C 34 % 830 psig

- NO operator actions have been taken.

Which ONE of the following is the expected position of (1) 1AF-143 STM TURB AUX FW B ISOLATION AND (2) 1MS-70, 'B' SG to AFW Turbine?

A. (1) OPEN (2) OPEN B. (1) OPEN (2) CLOSED C. (1) CLOSED (2) OPEN D. (1) CLOSED (2) CLOSED Tuesday, December 08,20094:18:12 PM 43

44. Given the following plant conditions:

- The plant is operating at 9% power

- The Main Turbine is at 1800 RPM with the plant preparing for synch to the grid

- The 'A' Main Feedwater Regulating Valve fails open Which ONE of the following identifies the 'A' SG level at which a Feedwater Isolation Signal will be generated AND the effect on the plant?

'A' SG Level Plant Effect A. 73% Reactor Trip AND Turbine Trip B. 73% Turbine Trip ONLY C. 78% Reactor Trip AND Turbine Trip D. 78% Turbine Trip ONL ONLYY Tuesday, December 08,20094:18:12 PM 44

45. Given the following plant conditions:

- The plant was operating at 100% power when a Reactor Trip occurred

- The 'B' Reactor Trip Breaker failed to OPEN Which ONE of the following choices correctly completes the statement below?

As RCS temperature lowers to 557°F, a P-4 (Reactor Trip) with Low TAVG signal will be generated for Train(s) (1) AND the (2) will close.

A. '8' (1) 'A' AND 'B' (2) MFRVs AND the MFWIVs B. (1) 'A' ONLY (2) MFRVs AND the MFWIVs C. (1) 'A' ONLY (2) MFRVs ONLY D. (1) 'A' AND 'B' (2) MFRVs ONLY Tuesday, December 08,20094:18:12 PM 45

46. Given the following plant conditions:

- The plant was operating at 100% power when a loss of both MFW pumps occurred

- The crew implemented PATH-1

- Both Motor Driven AFW pumps are tripped

- A loss of DP-1 B-SB occurred after entry into EPP-004, Reactor Trip Response Which ONE of the following would be the MINIMUM action required lAW EPP-004 in order to establish the required feedwater flow to the SGs using the TDAFW pump?

Start the TDAFW pump (1) AND establish control of the TDAFW FCVs (2)

A. (1) locally (2) locally B. (1) locally (2) at the MCB C. (1) at the MCB (2) locally D. (1) at the MCB at the MCB (2) atthe Tuesday, December 08,20094:18:12 PM 46

47. Given the following plant conditions:

- A loss of Instrument Bus Inverter SI has occurred

- The crew is performing action contained in AOP-024, Loss of Uninterruptible Power Supply

- Transfer of Bus SI to the alternate supply is required in accordance with OP-156.02, AC Electrical Distribution Which ONE of the following describes how improper sequencing of the Instrument Bus is prevented for this transfer?

A. The inverter will not allow transfer to the alternate supply if it is out of synch with the normal supply B. The transfer requires a kirk key to be used to ensure the primary supply is not paralleled with the alternate supply.

C. The normal and alternate supply breakers are electrically interlocked so that only one may be closed at a time D. The transfer control switch is a 'break before make' contactor that will not allow two power sources to simultaneously supply the bus Tuesday, December 08,20094:18:12 PM 47

48. The plant is operating at 100% power

- Irradiated fuel is being shuffled in the Fuel Handling Building

- Maintenance needs to be performed on the following breakers

- BKR 101, START-UP TRANSFORMER A TO AUXILIARY BUS 1D

- BKR 102, UNIT AUX TRANSFORMER A TO AUXILIARY BUS 1D

- The breakers will be worked on one at a time

- The maintenance activity will require removing the breakers from their respective cubicles and will require 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> to complete each activity Which ONE of the following choices completes the statement below?

Technical Specification entry will be required when maintenance begins on breaker (1) AND will require performance of (2) .

A. (1) 101 (2) OST-1023, OFF SITE POWER AVAILABILITY VERIFICATION WEEKLY INTERVAL MODES 1, 2, 3, 4, 5, 6, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> B. (1) 101 (2) OST-1024, ON-SITE POWER DISTRIBUTION VERIFICATION WEEKLY INTERVAL MODES 1 - 6 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> C. (1) 102 (2) OST-1023, OFF SITE POWER AVAILABILITY VERIFICATION WEEKLY INTERVAL MODES 1, 2, 3, 4, 5, 6, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> D. (1) 102 (2) OST-1024, ON-SITE POWER DISTRIBUTION VERIFICATION WEEKLY INTERVAL MODES 1 - 6 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Tuesday, December 08,20094:18:12 PM 48

49. Given the following plant conditions:

- Plant is shutdown with a cooldown is in progress

- RCS temperature is 195°F For the current plant conditions, the Technical Specification for DC electrical sources requires that (1) 125 volt emergency battery bank(s) be operable AND (2) associated full capacity battery charger(s) shall be operable.

(1) (2)

A. ONE ONE B. ONE TWO C. TWO ONE D. TWO TWO Tuesday, December 08,20094:18:12 PM 49

50. Given the following plant conditions:

- With the plant operating at 100% power, a loss of power to 6.9kV bus 1A-SA occurred

- EDG 1A-SA has been started but the output breaker has not been closed

- Annuniator ALB-015-4-4 125VDC EMER BUS A TROUBLE is lit

- The ERFIS point for Emer Bus DP-1ASA voltage indicates 128 volts and is decreasing In order to restore bus voltage to normal, 480V bus (1) must be energized and DC bus DP-1A-SA voltage will indicate normal (2) {2}

A. (1) 1A1 (2) as soon as the charger is placed in service B. (1) 1A1 (2) ONLY after the battery has been adequately recharged C. (1) 1A3-SA (2) as soon as the charger is placed in service D. (1) 1 A3-SA 1A3-SA (2) ONLY after the battery has been adequately recharged Tuesday, December 08,20094:18:12 PM 50

51. Given the following plant conditions:

- The plant is operating at 100% power

- 'A' EDG has been just been secured after running lAW OP-155, Diesel Generator Emergency Power System

- 'A' EDG Fuel Oil Storage Tank indicates 102,500 gallons

- 'A' EDG Fuel Oil Day Tank indicated level is 47.8% and rising

- Specific gravity of the fuel oil in 'A' Fuel Oil Day Tank is 0.862

- 'B' EDG is now running lAW OP-155

--'B'

'B' EDG Fuel Oil Storage Tank indicates 104,300 gallons

- 'B' EDG Fuel Oil Day Tank indicated level is 47.1%47.1 % and lowering

- Specific gravity of the fuel oil in 'B' Fuel Oil Day Tank is 0.884 Which ONE of the following is the CURRENT status of the Emergency Diesel Generators lAW Tech Specs?

(Reference provided)

'A'EDG 'B'EDG A. OPERABLE OPERABLE B. OPERABLE INOPERABLE C. INOPERABLE OPERABLE D. INOPERABLE INOPERABLE Tuesday, December 08,20094:18:12 PM 51

52. The Treated Laundry and Hot Shower Tank Pump Discharge radiation monitor uses a (1) detector because of the detector's ability to detect (2) radiation.

(1 ) (2)

A. Scintillation beta B. Scintillation gamma C. G-M Tube beta D. G-M Tube gamma Tuesday, December 08,20094:18:12 PM 52

53. Given the following plant conditions:

- The plant was in Mode 4 when a loss Loss of Off-site power occurred

- The 'A' EDG failed to start

'8' NSW pump is tagged out for maintenance

- The 'B' Which ONE of the following choices correctly completes the statement below?

ESW is providing flow to CCW Heat Exchanger(s) (1) with ESW return header flow aligned to the (2) .

A. (1) 'B' '8' ONLY (2) Auxiliary Reservoir

'8' ONLY B. (1) 'B'ONlY (2) Cooling Tower Basin C. (1) 'A' AND 'B' (2) Auxiliary Reservoir D. (1) 'A' AND 'B' (2) Cooling Tower Basin Tuesday, December 08,20094:18:12 PM 53

54. Given the following plant conditions:

- The plant is operating at 100% power

- A loss of Instrument Air is in progress

- At 1015, the crew implemented AOP-017, Loss of Instrument Air

- Instrument Air pressure continues to lower as follows:

Time IA Pressure 1020 83 psig 1030 75 psig 1050 58 psig 1110 34 psig Which ONE of the following identifies the FIRST time at which tripping the Reactor is required lAW AOP-017?

A. 1020 B. 1030

c. 1050 D. 1110 Tuesday, December 08,20094:18:12 PM 54
55. Which ONE of the following describes the automatic operation of Containment Normal Purge Damper, CP-D6-1, Fan Suction Damper to AH-82-1A?

CP-D6-1 modulates to maintain _ _ __

A. flow at a programmed setpoint.

B. differential pressure at a programmed setpoint.

C. flow at a setpoint established using a 10 turn potentiometer.

D. differential pressure at a setpoint established using a 10 turn potentiometer.

Tuesday, December 08, 20094:18:12 PM 55

56. Which ONE of the following identifies the power supplies to the 'A' and 'B' Rod Drive Orive Motor Generator (MG) sets?

'A' MG set 'B' MG set A. 102 1E2 B. 1E2 102 C. 103 1E3 O. 1E3 103 Tuesday, December 08,20094:18:12 PM 56

57. Given the following plant conditions:

- The plant is operating at 90% power

- Automatic PRZ level control failed and PRZ level control is now in MANUAL

- PRZ level is stable at 50%

Which ONE of the following choices correctly completes the statements below?

Based on these conditions PRZ level should be returned to (1) .

Per the FSAR the basis for this level is to (2) following a Reactor trip.

A. (1) 56.5%

(2) ensure PRZ heaters remain covered B. (1) 56.5%

(2) prevent letdown isolation C. (1) 54%

(2) ensure PRZ heaters remain covered D. (1) 54%

(2) prevent letdown isolation

Tuesday, Tuesday. December 08.20094:18:12 08,20094:18:12 PM 57
58. Given the following plant conditions:

- At 1000 An automatic Reactor Trip occurred Multiple rod bottom lights are NOT lit

- At 1005 Power Range channels indicate 3% power Intermediate Range SUR channneis are at 0 DPM and stable Which ONE of the following choices correctly completes the statement below?

The current condition of the Reactor lAW FRP-S.1 is (1) AND the preferred source of water lAW with AOP-002, Emergency Boration is from the (2)

A. (1) subcritical (2) RWST B. (1) subcritical (2) BAT c.

C. (1) critical (2) RWST D. (1)

(1) critical (2) BAT Tuesday, December 08,20094:18:12 PM 58

59. Given the following plant conditions:

- The plant was operating at 100% power when the Reactor Tripped

- IR NI-35 did not respond as expected due to a total loss of compensating voltage

- IR NI-36 responded normally Which ONE of the following describes Source Range instrument response to these conditions?

A. BOTH SR N Is will automatically energize Nls B. ONLY SR channel NI-31 will automatically energize C. ONLY SR channel NI-32 will automatically energize D. NEITHER SR NI will automatically energize Tuesday, December 08,20094:18:12 PM 59

60. Given the following plant conditions:

- The plant is operating at 90% power

- PT-446 fails low and AOP-001, Malfunction of Rod Control and Indication System, immediate actions are completed

- TURBINE FIRST STAGE PRESSURE CONTROL SELECTOR switch is taken to the CHAN 447 position Which ONE of the following identifies (1) the status of the C-5, Low Power Block of Automatic Rod Withdrawal light on the Bypass Permissive Light Panel AND (2) how automatic outward rod motion would be affected if Rod Control was placed in AUTO?

A. (1) illuminated (2) blocked B. (1) illuminated (2) unaffected C. (1) extinguished (2) unaffected D. (1) extinguished (2) blocked Tuesday, December 08,20094:18:12 PM 60

61. Given the following plant conditions:

- An electrical fire in the MCR has resulted in the evacuation of the MeR MCR to the ACP

- You have been directed to monitor in core thermocouple temperatures from outside the MCR per AOP-004, Remote Shutdown Which ONE of the following identifies the location of the Inadequate Core Cooling Monitor local microprocessor panel AND the method of obtaining readings at the panel?

A. PIC Room C-17/19 RAB 286' using CRT monitor and keyboard.

B. PIC Room C-17/19 RAB 286' using thumbwheels set to specific points identified by a legend.

C. PIC Room RAB 305' using CRT monitor and keyboard.

D. PIC Room RAB 305' using thumbwheels set to specific points identified by a legend.

Tuesday, December 08,20094:18:12 PM 61

62. Given the following plant conditions:

- A LOCA has occurred

- Current containment conditions are as follows:

- Containment Pressure is 3.5 psig

- Containment temperature is 120°F

- Hydrogen concentration is 2.0%

- Containment temperature prior to the LOCA was gO°F lAW OP-125, Post Accident Hydrogen System, which ONE of the following identifies (1) the power setting for the "B" Hydrogen Recombiner AND (2) the hydrogen concentration maximum limit for Hydrogen Recombiner operation?

(Reference provided)

A. (1) 46.3 KW (2) 3.0%

B. (1) 46.3 46.3KWKW (2) 4.0%

C. (1) 48.3 KW (2) 4.0%

D. (1) 48.3 KW (2) 3.0%

Tuesday, December 08,20094:18:12 08, 20094:18:12 PM 62

63. What is the initial impact of the 'B' Steam Generator MSIV closing when the plant is operating at 30% power on the following parameters?

'A' SG Steam Flow 'B' SG Level A. rises rises B. rises lowers C. stays the same rises D. stays the same lowers Tuesday, December 08,20094:18:12 PM 63

64. Given the following plant conditions:

- A plant shutdown and cooldown to Cold Shutdown is in progress

- Tavg is 551°F and stablizing

- The BOP identifies the Steam Dumps have closed

- Both steam dump interlock selector switches are taken to BYPASS and then back to ON

- The Bypass Permissive light "Low-Low Tavg Steam Dump Block (P-12) Bypassed" light is ON

- The 'B' train P-12 did NOT bypass Which ONE of the following choices identifies how Steam Dumps will operate during these conditions?

A. ONLY three condenser Steam Dump valves can still be opened B. All six condenser Steam Dump valves can be opened C. All six condenser and all six atmospheric Steam Dump valves can be opened D. None of the Steam Dumps can be opened Tuesday, December 08,20094:18:12 PM 64

65. The plant is operating at 75% power when the 'B' Condensate Pump trips.

Which ONE of the following identifies the expected response of the Condensate Booster Pumps (CBP) and Main Feedwater Pumps (MFPs)?

A. ONLY 'B' CBP will trip B. ONLY 'B' MFP will trip C. 'B' CBP and 'B' MFP will trip D. No CBPs or MFPs will tip Tuesday, December 08,20094:18:12 PM 65

66. Given the following plant conditions:

- A Reactor Trip and Safety Injection have occurred from 100% power

- The crew is performing PATH-1

- Containment pressure is 3.1 psig

- 'A' SG NR level is increasing in an uncontrolled manner Which ONE of the following identifies (1) the required 'A' SG NR level to isolate AFW to the 'A' SG AND (2) which Auxiliary Feedwater valves PATH-1 would direct to be shut FIRST?

A. (1) 25% NR level (2) 1AF-55 and 1AF-137, Aux FW 'A' Isolations B. (1) 25% NR level (2) 1AF-49 and 1AF-129, Aux FW 'A' Flow Control Valves C. (1) 40% NR level (2) 1AF-49 and 1AF-129, Aux FW 'A' Flow Control Valves D. (1) 40% NR level (2) 1AF-55 and 1AF-137, Aux FW 'A' Isolations Tuesday, December 08,20094:18:12 08, 2009 4:18:12 PM 66

67. The plant is operating at 100% power.

Which ONE of the following will result in annunciators being communicated using Transient Annunciator Response without further direction from the CRS/SM lAW OPS-NGGC-1000, Fleet Conduct of Operations?

A. Power Range N-43 failing high B. 'A' SG Channel 1 Level Indication failing low C. Pressurizer LT -459 failing low with PZR Level Selector in 459/460 D. 'A' EDG tripping during the performance of OP-155, Diesel Generator Emergency Power System 08, 2009 4:18:12 PM Tuesday, December 08,20094:18:12 67

68. With the plant operating in Mode 1, which ONE of the the following requires INDEPENDENT verification instead of CONCURRENT verification?

A. Installing a jumper in PIC-02 for a surveillance test B. Lifting leads in Rod Control Power Cabinet 1BD for troubleshooting C. Removal of control power fuses for a clearance on RHR pump 1B-SB D. Performance of PIC portions of OWP-RP due to the failure of PRZ PT-455 Tuesday, December 08,20094:18:12 PM 68

69. What Technical Specification OPERATIONAL MODE is the plant in with RCS temperature being maintained at 375°F AND how many CSIPs are required to be operable?

The plant is in Mode (a) AND there must be at least (b) CSIP(s) operable.

A. (a) 3 (b) 1 B. (a) 4 (b) 1 C. (a) 4 (b) 2 D. (a) 3 (b) 2 Tuesday, December 08,20094:18:12 PM 69

70. Given the following plant conditions:

REM-01SW-3500A,

- REM-01 SW-3500A, SW from WPB to Circ Water radiation monitor is in alarm

- Chemistry sample verifies high activity in the piping monitored by REM-01SW-3500A Which ONE of the following describes the impact on the release in progress AND the action required lAW AOP-005, Radiation Monitoring System?

A. The release will be automatically terminated Start the standby train of ESW and place the running train of ESW in standby B. The release will be automatically terminated Direct the Radwaste Operator to isolate WPB equipment C. The release will NOT be automatically terminated Start the standby train of ESW and place the running train of ESW in standby D. The release will NOT be automatically terminated Direct the Radwaste Operator to isolate WPB equipment Tuesday, December 08,20094:18:12 PM 70

71. Given the following plant conditions:

- Fuel handling operations are in progress

- Several Fuel Handling Building (FHB) area radiation monitors on both trains show increasing radiation levels

- ONE 'A' train channel has reached its high alarm setpoint Based on these plant conditions, the FHB Operating Floor Supply Fans (AH-56, AH-57, AH-58, AH-59) will be (1) AND FHB Emergency Exhaust Fan E-13 will be (2)

A. (1) running (2) secured B. (1) running (2) running C. (1) secured (2) running D. (1) secured (2) secured Tuesday, December 08,20094:18:12 PM 71

72. With the plant at power, as a member of Operations, which ONE of the following tasks would require utilization of a Special RWP in order for you to complete the activity?

A. Entry into a High Radiation Area to evaluate boric acid deposits B. Entry into a Locked High Radiation Area to hang a clearance C. Entry into Containment to inspect for ReS RCS leakage on CNMT Level 221 dpm/1 00cm 2 to D. Entry into an area with loose surface contamination at 2500 dpm/100cm perform a valve line-up Tuesday, December 08,20094:18:12 PM 72

73. During a plant startup with power at 8%, which ONE of the following conditions requires entry into PATH-1?

A. Pressurizer Level exceeds 92%

B. One Reactor Coolant Pump trips C. Pressurizer Pressure exceeds 2385 psig D. All turbine governor and throttle valves close Tuesday, December 08,20094:18:12 PM 73

74. FRP-H.1, "Response to Loss of Secondary Heat Sink," is in progress in response to a RED Heat Sink condition.

The crew is progressing through FRP-H.1 when critical safety function status tree T.he conditions are reported as follows:

- Subcriticality: Orange

- Core Cooling: Green

- Heat Sink: Yellow

- Integrity: Green

- Containment: Red

- Inventory: Yellow Which ONE of the following describes the actions the crew should take in response to the conditions given above?

A. Complete FRP-H.1, then transition to FRP-J.1.

B. Complete FRP-H.1, then transition to FRP-S.1.

C. Immediately exit FRP-H.1 and transition to FRP-S.1.

D. Immediately exit FRP-H.1 and transition to FRP-J.1.

Tuesday, December 08,20094:18:12 PM 74

75. Given the following plant conditions:

- A startup is in progress with Reactor power at 7%

- The Main Turbine is at 1800 RPM

- The 'A' and 'B' CW pumps have just tripped

- Condenser Zone 1 pressure is 4.5 inches Hg absolute

- Condenser Zone 2 pressure is 5.1 inches Hg absolute Based on current plant conditions, the crew should implement (1) and (2)

A. (1) AOP-O AOP-012,12, Partial Loss of Condenser Vacuum (2) Manually trip the turbine B. (1) AOP-012, Partial Loss of Condenser Vacuum (2) Verify automatic turbine trip C. (1) AOP-006, Turbine Generator Trouble (2) Manually trip the turbine D. (1) AOP-006, Turbine Generator Trouble (2) Verify automatic turbine trip You have completed the testl Tuesday, December 08,20094:18:12 08, 20094:18:12 PM 75

References provide to applicants for the 2009-302 NRC written exam:

RO test:

Question # 2 Steam Tables Question # 3 Steam Tables Question # 21 AOP-001 Attachment 2 pages 41-43 (Rev. 34)

Question # 51 Curve O-X-20 (Rev. 1)

Question # 62 OP-125 Attachment 6 page 51 (Rev. 22)

SRO test:

Question # 85 EAL Flow path sides 1 and 2, EP-EAL pages 25,28,44, 25, 28, 44, and 46 (Rev. 7)

Question # 87 PLP-114 page 8 (Rev. 21)

~PnQf2tS2001-

~rw{2.l.S 2001- 302 30Z ANSWER KEY REPORT for 2009B NRC RO Rev Final Test Form: 0

--~----.-~---

~~~--- .. Answers -------..

~~-----~----~---~

---~

~-----,---~-;-

~----.------ .


.--~-~--~

~.--~-.-.--

  1. ID .Points Type 0 1 2009B NRC RO 1 l.00 MCS C 2 2009B NRC RO 2 l.00 1.00 MCS D 3 2009B NRC RO 3 1.00 l.00 MCS A 4 2009B NRC RO 4 1.00 l.00 MCS C 5 2009B NRC RO 5 1.00 l.00 MCS C 6 2009B NRC RO 6 l.00 MCS B 7 2009B NRC RO 7 1.00 l.00 MCS B 8 2009B NRC RO 8 l.00 MCS D 9 2009B NRC RO 9 1.00 l.00 MCS B 10 2009B NRC RO 10 l.00 MCS B 11 11 2009B NRC RO 11 1.00 l.00 MCS C 12 2009B NRC RO 12 1.00 l.00 MCS B 13 2009B NRC RO 13 l.00 MCS B 14 2009B NRC RO 14 -1.00 l.00 MCS B 15 2009B NRC RO 15 l.00 MCS C 16 2009B NRC RO 16 1.00 l.00 MCS A 17 2009B NRC RO 17 l.00 MCS D 18 2009B NRC RO 18 l.00 1.00 MCS A 19 2009B NRC RO 19 1.00 l.00 MCS C 20 2009B NRC RO 20 1.00 l.00 MCS B 21 2009B NRC RO 21 1.00 l.00 MCS B 22 2009B NRC RO 22 1.00 l.00 MCS C 23 2009B NRC RO 23 1.00 MCS B 24 2009B NRC RO 24 1.00 MCS C 25 2009B NRC RO 25 l.00 1.00 MCS B 26 2009B NRC RO 26 l.00 MCS A 27 2009B NRC RO 27 1.00 MCS A 28 2009B NRC RO 28 l.00 MCS A 29 2009B NRC RO 29 1.00 MCS B 30 2009B NRC RO 30 1.00 MCS C 31 2009B NRC RO 31 1.00 MCS D 32 2009B NRC RO 32 1.00 MCS A 33 2009B NRC RO 33 1.00 MCS C 34 2009B NRC RO 34 1.00 MCS B 35 2009B NRC RO 35 l.00 1.00 MCS D 36 2009B NRC RO 36 1.00 MCS D 37 2009B NRC RO 37 1.00 MCS B 38 2009B NRC RO 38 1.00 MCS B 39 2009B NRC RO 39 l.00 1.00 MCS D 40 2009B NRC RO 40 1.00 MCS B 41 2009B NRC RO 41 1.00 MCS A 42 2009B NRC RO 42 1.00 MCS B 43 2009B NRC RO 43 l.00 MCS D 44 2009B NRC RO 44 l.00 1.00 MCS D 45 2009B NRC RO 45 l.00 1.00 MCS C 46 2009B NRC RO 46 1.00 l.00 MCS B 47 2009B NRC RO 47 1.00 MCS B Tuesday, December 08,20094:19:35 08, 2009 4:19:35 PM 1

ANSWER KEY REPORT for 2009B NRC RO Rev Final Test Form: 0

-.-.~---.--- Answers*. - - - -....._ - - -

Answers

  1. ID Points '. Type 0 48 2009B NRC RO 48 1.00 MCS A 49 2009B NRC RO 49 1.00 MCS A 50 2009B NRC RO 50 1.00 MCS C 51 2009B NRC RO 51 1.00 MCS B 52 2009B NRC RO 52 1.00 MCS B 53 2009B NRC RO 53 1.00 MCS A 54 2009B NRC RO 54 1.00 MCS C 55 2009B NRC RO 55 1.00 MCS D 56 2009B NRC RO 56 1.00 MCS A 57 2009B NRC RO 57 1.00 MCS A 58 2009B NRC RO 58 1.00 MCS D 59 2009B NRC RO 59 1.00 MCS D 60 2009B NRC RO 60 1.00 MCS C 61 2009B NRC RO 61 1.00 MCS B 62 2009B NRC RO 62 1.00 MCS C 63 2009B NRC RO 63 l.00 1.00 MCS B 64 2009B NRC RO 64 1.00 MCS D 65 2009B NRC RO 65 1.00 MCS C 66 2009B NRC RO 66 1.00 MCS D 67 2009B NRC RO 67 1.00 MCS A 68 2009B NRC RO 68 1.00 MCS C 69 2009B NRC RO 69 1.00 MCS D 70 2009B NRC RO 70 1.00 MCS D 71 2009B NRC RO 71 1.00 MCS D 72 2009B NRC RO 72 1.00 MCS C 73 2009B NRC RO 73 1.00 MCS C 74 2009B NRC RO 74 1.00 MCS A 75 2009B NRC RO 75 1.00 MCS A Tuesday, December 08,20094:19:35 PM 2