ML100740371: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML100740371
| number = ML100740371
| issue date = 02/25/2010
| issue date = 02/25/2010
| title = Catawba Selected Licensee Commitments Manual, Revision Date 11/23/09
| title = Selected Licensee Commitments Manual, Revision Date 11/23/09
| author name = Aldridge B
| author name = Aldridge B
| author affiliation = Duke Energy Corp
| author affiliation = Duke Energy Corp
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO PRIORITY PTHE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS OTHERWISE IDENTIFIED BELOW 1) 03759 U S NUC REG WASHINGTON, DC 2) 03796 SCIENTECH DUNEDIN, FL 3) 03833 CNS COMPL FILE (ORIG)X CN01 RC 4) 03945 OPS TRAINING CT01A 5) 04446 M E HENSHAW EC08H 6) 04490 C T KIKER CT01A 7) 04552 L E HAYNES EC07F 8) 05160 P T VU MG01RC 9) 05309 R L EDMOND CT01A 10) 05327 L P BYERS CN02OP 11) 05328 CNS OPS REF LIBRARY CN02OP 12) 05330 CNS PLANT ENGINEERING CN03CE 13) 05339 CNS RP SHIFT OFFICE CN02RP 14) 05342 CNS SECURITY LIBRARY CN01SC 15) 05512 CNS REG. COMP. MGR CN01RC Duke Energy DOCUMENT TRANSMITTAL FORM REFERENCE CATAWBA NUCLEAR STATION SELECTED LICENSEE COMMITMENTS Page 3 of 4 Date: -02/25/10 Document Transmittal
{{#Wiki_filter:PRIORITY      PTHE              DISPOSITION OF THE TRANSMITTAL   SIGNATURE DOCUMENT ORIGINAL UNLESS     WILL BEISTO RECIPIENT                                         Date: - 02/25/10 OTHERWISE   IDENTIFIED BELOW Document Transmittal #:        DUK100560042
#: DUK100560042 QA CONDITION
: 1) 03759 US NUC REG WASHINGTON, DC
[] Yes
: 2) 03796 SCIENTECH DUNEDIN, FL                                                       Duke Energy                      QA CONDITION                              []  Yes
* No OTHER ACKNOWLEDGEMENT REQUIRED
* No
* Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO: Duke Energy 4800 Concord Road Document Management CN04DM York, South Carolina 29745 Rec'd By Date DOCUMENT NO QA COND REV #/DATE DISTR CODE 1 2 3 4 51 6 7 8 9 10 11 12 13 14 15 TOTAL LOES (4 PAGES)CHAPTER 16.7-2 CHAPTER 16.7-10 CHAPTER 16.11-7 NA NA NA NA 045 003 003 004 02/23/10 02/25/10 02/25/10 02/25/10 CADM-03 V10 Vl X V26 vi V1 V1 Vi V1 V3 V1 V1 V1 v'1 vi 87 REMARKS: PLEASE REFER TO THE ATTACHED MEMO FOR FILING INSTRUCTIONS.
: 3) 03833 CNS COMPL FILE (ORIG)X CN01 RC DOCUMENT TRANSMITTAL FORM                OTHER ACKNOWLEDGEMENT REQUIRED
J R MORRIS VICE PRESIDENT CATAWBA NUCLEAR STATION BY: BALDRIDGE CN01SA BA/RBE hDuke DUKE ENERGY CORPORATION Catawba Nuclear Station Energy. 4800 Concord Rd.York, SC 29745 February 23, 2010 Re- Catawba Nuclear Station Selected Licensee Commitments Manual Revision Date: 11/23/09 Attached are revisions to the Catawba Nuclear Station Selected Licensee Commitments Manual. Please remove and replace the following pages: REMOVE THESE PAGES INSERT THESE PAGES LIST OF EFFECTIVE SECTIONS Pages 1 through 4 Revision 44 Pages 1 through 4 Revision 45 TAB 16.7 SLC 16.7-2 Revision 2 SLC 16.7-2 Revision 3 SLC 16.7-10 Revision 2 SLC 16.7-10 Revision 3 www. duke-energy.
* Yes
com TAB 16.11 SLC 16.11-7 Revision 3 SLC 16.11-7 Revision 4 If you have any questions concerning the contents of this package update, contact Betty Aldridge at (803)701-3758.
: 4) 03945 OPS TRAINING CT01A                                                                                             IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE
Manager, Regulatory Compliance Attachment LIST OF EFFECTIVE SECTIONS SECTION TABLE OF CONTENTS 16.1 16.2 16.3 16.5-1 16.5-2 16.5-3 16.5-4 16.5-5 16.5-6 16.5-7 16.5-8 16.5-9 16.5-10 16.6-1 16.6-2 16.6-3 16.6-4 16.6-5 16.7-1 16.7-2 16.7-3 16.7-4 16.7-5 REVISION NUMBER 12 1 2 1 1 Deleted 1 0 1 1 0 2 0 Deleted 0 Deleted 1 1 1 1 3 1 2 2 REVISION DATE 06/08/09 08/27/08 08/21/09 08/21/09 10/24/06 02/20/04 10/09/02 01/28/10 08/21/09 10/09/02 12/22/08 10/24/06 10/09/02 08/21/09 08/21/09 08/21/09 08/21/09 11/23/09 08/21/09 08/21/09 08/21/09 Catawba Units 1 and 2 Page 1 Revision 45 LIST OF EFFECTIVE SECTIONS SECTION 16.7-6 16.7-7 16.7-8 16.7-9 16.7-10 16.7-11 16.7-12 16.7-13 16.7-14 16.7-15 16.7-16 16.8-1 16.8-2 16.8-3 16.8-4 16.8-5 16.9-1 16.9-2 16.9-3 16.9-4 16.9-5 16.9-6 16.9-7 16.9-8 REVISION NUMBER 2 1 2 5 3 1 1 2 1 1 0 3 1 1 2 3 5 4 1 3 5 7 4 5 REVISION DATE 08/21/09 08/21/09 08/21/09 08/21/09 11/23/09 08/21/09 08/21/09 08/21/09 08/21/09 08/21/09 06/08/09 08/21/09 10/24/06 10/24/06 11/05/07 08/21/09 08/21/09 08/21/09 08/21/09 08/21/09 08/21/09 08/21/09 08/21/09 08/21/09 Catawba Units 1 and 2 Page-2 Revision 45 LIST OF EFFECTIVE SECTIONS SECTION 16.9-9 16.9-10 16.9-11 16.9-12 16.9-13 16.9-14 16.9-15 16.9-16 16.9-17 16.9-18 16.9-19 16.9-20 16.9-21 16.9-22 16.9-23 16.9-24 16.9-25 16.10-1 16.10-2 16.10-3 16.11-1 16.11-2 16.11-3 16.11-4 REVISION NUMBER 3 5 3 2 3 1 2 2 0 0 2 0 0 1 3 2 2 1 1 1 0 2 0 1 REVISION DATE 08/21/09 08/21/09 08/21/09 08/21/09 08/21/09 09/25/06 08/21/09 08/21/09 10/09/02 10/09/02 08/21/09 10/09/02 10/09/02 08/21/09 08/21/09 10/24/06 08/21/09 08/21/09 10/24/06 08/21/09 10/09/02 08/21/09 10/09/02 08/21/09)Catawba Units 1 and 2 Page 3 Revision 45 LIST OF EFFECTIVE SECTIONS SECTION 16.11-5 16.11-6 16.11-7 16.11-8 16.11-9 16.11-10 16.11-11 16.11-12 16.11-13 16.11-14 16.11-15 16.11-16 16.11-17 16.11-18 16.11-19 16.11-20 16.11-21 16.12-1 16.13-1 16.13-2 16.13-3 16.13-4 REVISION NUMBER 0 1 4 0 0 1 1 0 0 0 0 0 0 1 0 1 0 0 0 Deleted Deleted 0 REVISION DATE 10/09/02 06/08/09 11/23109 10/09/02 10/09/02 08/21/09 03/20/03 10/09/02 10/09/02 10/09/02 10/09/02 10/09/02 10/09/02 08/21/09 10/09/02 08/21/09 10/09/02 10/09/02 10/09/02 10/09/02 Catawba Units 1 and 2 Page 4 Revision 45 Seismic Instrumentation 16.7-2.16.7 INSTRUMENTATION 16.7-2 Seismic Instrumentation COMMITMENT APPLICABILITY:
: 5) 04446 ME HENSHAW EC08H                                                                                               ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:
The seismic monitoring instrumentation shown in Table 16.7-2-1 shall be FUNCTIONAL.
REFERENCE
At all times.REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Restore non-functional 30 days seismic monitoring instrument(s) to instrument(s) non- FUNCTIONAL status.functional.
: 6) 04490 C T KIKER CT01A
OR A.2 Prepare and submit a 40 days Special Report to the Commission outlining the cause of the malfunction, and the plans for restoring the instrument(s) to FUNCTIONAL status.B. Accessible seismic. B.1 Restore instrument(s) to Within 24 hours monitoring instrument(s)
: 7) 04552 LE HAYNES EC07F                                                       CATAWBA NUCLEAR STATION Duke Energy
FUNCTIONAL status. following the seismic actuated during a event seismic event > 0.01 g.AND B.2 Retrieve data from! Within 24 hours actuated instrument(s) and following the seismic analyze to determine event magnitude of vibratory ground motion.AND (continued)
: 8) 05160 P TVU MG01RC                                                         SELECTED LICENSEE COMMITMENTS                    4800 Concord Road
Catawba Units 1 and 2 16.7-2-1 Revision 3 Seismic Instrumentation 16.7-2 REM ED IA L ACTIO NS ...... _CONDITION REQUIRED ACTION COMPLETION TIME B. (continued)
: 9) 05309 R L EDMOND CT01A                                                                                                       Document Management
B.3 Prepare and submit a 10 days Special Report to the Commission describing the magnitude, frequency spectrum, and resultant effect upon facility features important to safety.TESTING REQUIREMENTS
: 10) 05327 LP BYERS CN02OP                                                                                                         CN04DM York, South Carolina 29745
----------------------------
: 11) 05328 CNS OPS REF LIBRARY CN02OP
NOTE ------------------------------
: 12) 05330 CNS PLANT ENGINEERING CN03CE
: 13) 05339 CNS RP SHIFT OFFICE CN02RP
: 14) 05342 CNS SECURITY LIBRARY CN01SC
: 15) 05512 CNS REG. COMP. MGR CN01RC Rec'd By Page 3 of 4                 Date DOCUMENT NO                                            QA COND      REV #/DATE      DISTR CODE    1  2  3  4  51  6    7      8    9    10   11  12  13    14  15  TOTAL LOES (4 PAGES)                                            NA        045  02/23/10  CADM-03        V10 Vl X  V26 vi  V1    V1    Vi    V1  V3    V1  V1  V1    v'1  vi      87 CHAPTER 16.7-2                                            NA        003  02/25/10 CHAPTER 16.7-10                                          NA        003  02/25/10 CHAPTER 16.11-7                                           NA        004  02/25/10 REMARKS: PLEASE REFER TO THE ATTACHED MEMO FOR FILING INSTRUCTIONS.                                                                  J R MORRIS VICE PRESIDENT CATAWBA NUCLEAR STATION BY:
BALDRIDGE CN01SA            BA/RBE
 
hDuke Energy.
Catawba Nuclear Station DUKE            CORPORATION ENERGY Rd.
4800 Concord York, SC 29745 February 23, 2010 Re-   Catawba Nuclear Station Selected Licensee Commitments Manual Revision Date: 11/23/09 Attached are revisions to the Catawba Nuclear Station Selected Licensee Commitments Manual. Please remove and replace the following pages:
REMOVE THESE PAGES                                  INSERT THESE PAGES LIST OF EFFECTIVE SECTIONS Pages 1 through 4                                        Pages 1 through 4 Revision 44                                              Revision 45 TAB 16.7 SLC 16.7-2                                              SLC 16.7-2 Revision 2                                              Revision 3 SLC 16.7-10                                            SLC 16.7-10 Revision 2                                              Revision 3 www. duke-energy. com
 
TAB 16.11 SLC 16.11-7                                             SLC 16.11-7 Revision 3                                              Revision 4 Ifyou have any questions concerning the contents of this package update, contact Betty Aldridge at (803)701-3758.
Manager, Regulatory Compliance Attachment
 
LIST OF EFFECTIVE SECTIONS SECTION                    REVISION NUMBER      REVISION DATE TABLE OF CONTENTS          12                    06/08/09 16.1                      1                    08/27/08 16.2                      2                    08/21/09 16.3                      1                     08/21/09 16.5-1                     1                    10/24/06 16.5-2                     Deleted 16.5-3                     1                    02/20/04 16.5-4                     0                    10/09/02 16.5-5                     1                    01/28/10 16.5-6                     1                    08/21/09 16.5-7                     0                    10/09/02 16.5-8                    2                    12/22/08 16.5-9                     0                    10/24/06 16.5-10                   Deleted 16.6-1                     0                    10/09/02 16.6-2                     Deleted 16.6-3                     1                    08/21/09 16.6-4                     1                    08/21/09 16.6-5                     1                    08/21/09 16.7-1                     1                    08/21/09 16.7-2                     3                     11/23/09 16.7-3                      1                    08/21/09 16.7-4                     2                    08/21/09 16.7-5                     2                     08/21/09 Catawba Units 1 and 2         Page 1               Revision 45
 
LIST OF EFFECTIVE SECTIONS SECTION                    REVISION NUMBER      REVISION DATE 16.7-6                    2                    08/21/09 16.7-7                    1                    08/21/09 16.7-8                    2                    08/21/09 16.7-9                    5                    08/21/09 16.7-10                   3                    11/23/09 16.7-11                    1                    08/21/09 16.7-12                    1                    08/21/09 16.7-13                    2                    08/21/09 16.7-14                    1                    08/21/09 16.7-15                    1                    08/21/09 16.7-16                    0                    06/08/09 16.8-1                    3                    08/21/09 16.8-2                     1                     10/24/06 16.8-3                    1                    10/24/06 16.8-4                    2                    11/05/07 16.8-5                    3                    08/21/09 16.9-1                    5                    08/21/09 16.9-2                    4                    08/21/09 16.9-3                    1                    08/21/09 16.9-4                    3                    08/21/09 16.9-5                    5                    08/21/09 16.9-6                    7                     08/21/09 16.9-7                     4                    08/21/09 16.9-8                     5                    08/21/09 Catawba Units 1 and 2        Page-2               Revision 45
 
LIST OF EFFECTIVE SECTIONS SECTION                    REVISION NUMBER      REVISION DATE 16.9-9                    3                     08/21/09 16.9-10                    5                     08/21/09 16.9-11                    3                    08/21/09 16.9-12                    2                     08/21/09 16.9-13                    3                     08/21/09 16.9-14                    1                    09/25/06 16.9-15                    2                    08/21/09 16.9-16                   2                    08/21/09 16.9-17                    0                    10/09/02 16.9-18                    0                     10/09/02 16.9-19                    2                    08/21/09 16.9-20                    0                    10/09/02 16.9-21                   0                    10/09/02 16.9-22                    1                    08/21/09 16.9-23                    3                    08/21/09 16.9-24                    2                    10/24/06 16.9-25                    2                    08/21/09 16.10-1                    1                    08/21/09 16.10-2                    1                    10/24/06 16.10-3                    1                    08/21/09 16.11-1                    0                      10/09/02 16.11-2                    2                    08/21/09 16.11-3                    0                      10/09/02 16.11-4                    1                    08/21/09
                                              )
Catawba Units 1 and 2          Page 3                Revision 45
 
LIST OF EFFECTIVE SECTIONS SECTION                   REVISION NUMBER      REVISION DATE 16.11-5                    0                    10/09/02 1                    06/08/09 16.11-6 16.11-7                    4                    11/23109 16.11-8                    0                    10/09/02 16.11-9                   0                    10/09/02 16.11-10                  1                    08/21/09 16.11-11                  1                    03/20/03 16.11-12                  0                    10/09/02 16.11-13                  0                    10/09/02 16.11-14                  0                    10/09/02 16.11-15                  0                    10/09/02 16.11-16                   0                    10/09/02 16.11-17                  0                    10/09/02 16.11-18                    1                    08/21/09 16.11-19                  0                    10/09/02 16.11-20                    1                   08/21/09 16.11-21                    0                    10/09/02 16.12-1                    0                    10/09/02 16.13-1                     0                    10/09/02 16.13-2                    Deleted 16.13-3                    Deleted 16.13-4                    0                    10/09/02 Catawba Units 1 and 2          Page 4              Revision 45
 
Seismic Instrumentation 16.7-2
. 16.7  INSTRUMENTATION 16.7-2 Seismic Instrumentation COMMITMENT            The seismic monitoring instrumentation shown in Table 16.7-2-1 shall be FUNCTIONAL.
APPLICABILITY:        At all times.
REMEDIAL ACTIONS CONDITION                      REQUIRED ACTION              COMPLETION TIME A. One or more required        A.1    Restore non-functional      30 days seismic monitoring                instrument(s) to instrument(s) non-                FUNCTIONAL status.
functional.
OR A.2    Prepare and submit a        40 days Special Report to the Commission outlining the cause of the malfunction, and the plans for restoring the instrument(s) to FUNCTIONAL status.
B. Accessible seismic.         B.1    Restore instrument(s) to    Within 24 hours monitoring instrument(s)          FUNCTIONAL status.           following the seismic actuated during a                                              event seismic event > 0.01 g.
AND B.2    Retrieve data from!        Within 24 hours actuated instrument(s) and  following the seismic analyze to determine        event magnitude of vibratory ground motion.
AND (continued)
Catawba Units 1 and 2                  16.7-2-1                              Revision 3
 
Seismic Instrumentation 16.7-2 REM ED IAL ACTIO NS                                              ......                         _
CONDITION                        REQUIRED ACTION                  COMPLETION TIME B.       (continued)                  B.3   Prepare and submit a            10 days Special Report to the Commission describing the magnitude, frequency spectrum, and resultant effect upon facility features important to safety.
TESTING REQUIREMENTS
----------------------------                   NOTE         ------------------------------
Refer to Table 16.7-2-1 to determine which TRs apply for each seismic instrument.
Refer to Table 16.7-2-1 to determine which TRs apply for each seismic instrument.
TEST FREQUENCY TR 16.7-2-1 --------------------
TEST                                         FREQUENCY TR 16.7-2-1             -------------------- NOTE-------------------
NOTE-------------------
CHANNEL CHECK not required for seismic trigger of lIEEVD 1030 or 1IEEVD 1040.
CHANNEL CHECK not required for seismic trigger of lIEEVD 1030 or 1IEEVD 1040.Perform CHANNEL CHECK. 14 days for first 3 months of service after initial system startup AND 31 days thereafte TR 16.7-2-2 Perform COT. 6 months TR 16.7-2-3 Perform CHANNEL CALIBRATION.
Perform CHANNEL CHECK.                                       14 days for first 3 months of service after initial system startup AND 31 days thereafte TR 16.7-2-2         Perform COT.                                                 6 months TR 16.7-2-3         Perform CHANNEL CALIBRATION.                                 18 months Catawba Units 1 and 2                       16.7-2-2                               Revision 3
18 months Catawba Units 1 and 2 16.7-2-2 Revision 3 Seismic Instrumentation 16.7-2 Table 16.7-2-1 Seismic Monitoring Instrumentation INSTRUMENTS AND SENSOR MEASUREMENT REQUIRED TESTING LOCATIONS RANGE CHANNELS REQUIREMENTS
 
: 1. Triaxial Accelerographs 1.a 1IEEVD 1020 (Remote -2 g to +2 g 1(1) TR 16.7-2-1 Sensor A) Unit 1 TR 16.7-2-2 Containment Base Slab TR 16.7-2-3 Elev. 553' 0" 1.b 11EEVD 1010 (Remote -2 g to +2 g 1 m TR 16.7-2-1 Sensor B) Unit 1 AFW TR 16.7-2-2 Pump Room Elev. 544' TR 16.7-2-3 0" 1.c 1IEEVD 1000 Control -2 g to +2 g i1 1 TR 16.7-2-1 Room Elev. 595' 0" TR 16.7-2-2 TR 16.7-2-3 1.d 1IEEVD 1030 Unit 1 -2,g to +2 g i1 1 TR 16.7-2-2 Containment Bldg. Elev.. TR 16.7-2-3 652' 0", Azimuth 00 i.e IIEEVD 1040 Unit 1 -2 g to +2 g i1 1 TR 16.7-2-2 Containment Bldg. Elev.. TR 16.7-2-3 612' 10", Azimuth 0Q (1) With reactor control room indication.
Seismic Instrumentation 16.7-2 Table 16.7-2-1 Seismic Monitoring Instrumentation INSTRUMENTS AND SENSOR                     MEASUREMENT         REQUIRED     TESTING LOCATIONS                             RANGE         CHANNELS REQUIREMENTS
Catawba Units 1 and 2 16.7-2-3 Revision 3 Seismic Instrumentation 16.7-2 BASES The FUNCTIONALITY of the seismic monitoring instrumentation ensures that sufficient capability is available to promptly determine the magnitude of a seismic event and evaluate the response of those features important to safety. This capability is required to permit comparison of the measured response to that used in the design basis for the facility to determine if plant shutdown is required pursuant to Appendix A of 10 CFR Part 100. The instrumentation is consistent with the recommendations of Regulatory Guide 1.12, "Nuclear Power Plant Instrumentation for Earthquakes", Revision 2.The seismic monitoring instrumentation system records seismic data acquired by five triaxial accelerographs (at locations per Table 16.7-2-1, Items 1.a through 1 .e); each accelerograph consists of a solid state recording device (using static random access memory (SDRAM) storage)and an integral micro electro-mechanical sensor (or MEMS accelerometer).
: 1.       Triaxial Accelerographs 1.a     1IEEVD 1020 (Remote                   -2 g to +2 g         1(1)     TR 16.7-2-1 Sensor A) Unit 1                                                     TR 16.7-2-2 Containment Base Slab                                               TR 16.7-2-3 Elev. 553' 0" 1.b     11EEVD 1010 (Remote                   -2 g to +2 g         1m      TR 16.7-2-1 Sensor B) Unit 1 AFW                                                 TR 16.7-2-2 Pump Room Elev. 544'                                                 TR 16.7-2-3 0"
All five accelerographs are connected to the network control center (NCC)11 EECS 1000 located in the control room (on the 1 MC8 back panel, near 1 IEEVD 1000). The NCC provides a centralized location for: on-line system monitoring (including continuous self-checking of significant functions and power supply status); data retrieval from each accelerograph; data transfer (download) to the dedicated system computer 1 IEECO 9000 for required analysis purposes (i.e., analysis required following a seismic event); system status indications (associated with the NCC and all five accelerographs);
1.c     1IEEVD 1000 Control                   -2 g to +2 g         i1 1     TR 16.7-2-1 Room Elev. 595' 0"                                                   TR 16.7-2-2 TR 16.7-2-3 1.d     1IEEVD 1030 Unit 1                   -2,g to +2 g         i1 1     TR 16.7-2-2 Containment Bldg. Elev..                                             TR 16.7-2-3 652' 0", Azimuth 00 i.e     IIEEVD 1040 Unit 1                   -2 g to +2 g         i1 1     TR 16.7-2-2 Containment Bldg. Elev..                                             TR 16.7-2-3 612' 10", Azimuth 0Q (1) With reactor control room indication.
date/time synchronization (for each accelerograph);
Catawba Units 1 and 2                             16.7-2-3                         Revision 3
and generation of a common "start recording" trigger command (to all accelerographs) in the event that a trigger acceleration threshold is exceeded.
 
System failures will result in an alarm condition on the NCC and a remote alarm sent to the Unit 1 Operator Aid Computer.The two upper containment accelerographs (1IEEVD 1030 and 1IEEVD 1040) were excluded from the CHANNEL CHECK required by TR 16.7-2-1, since they are not used to generate the Operating Basis Earthquake (OBE)exceedance signal (indicated by the Unit 1 control room annunciator system).The other three accelerographs were chosen since they are either: 1)located at the base of a Category 1 structure (1IEEVD 1010 and 1IEEVD 1020), consistent with measurement locations per Regulatory Guide 1.12 guidance; or 2) within the control room area (11 EEVD 1000), to confirm that the seismic event was felt by operators.
Seismic Instrumentation 16.7-2 BASES       The FUNCTIONALITY of the seismic monitoring instrumentation ensures that sufficient capability is available to promptly determine the magnitude of a seismic event and evaluate the response of those features important to safety. This capability is required to permit comparison of the measured response to that used in the design basis for the facility to determine if plant shutdown is required pursuant to Appendix A of 10 CFR Part 100. The instrumentation is consistent with the recommendations of Regulatory Guide 1.12, "Nuclear Power Plant Instrumentation for Earthquakes", Revision 2.
REFERENCES  
The seismic monitoring instrumentation system records seismic data acquired by five triaxial accelerographs (at locations per Table 16.7-2-1, Items 1.a through 1 .e); each accelerograph consists of a solid state recording device (using static random access memory (SDRAM) storage) and an integral micro electro-mechanical sensor (or MEMS accelerometer).
: 1. 10 CFR Part 100, Appendix A.2. Regulatory Guide 1.12, "Nuclear Power Plant Instrumentation for Earthquakes", Revision 2, March 1997.3. Catawba Updated Final Safety Analysis Report, Section 3.7.4,"Seismic Instrumentation Program".Catawba Units 1 and 2 16.7-2-4 Revision 3 Radiation Monitoring for Plant Operations 16.7-10 16.7 INSTRUMENTATION 16.7-10 Radiation Monitoring for Plant Operations COMMITMENT APPLICABILITY:
All five accelerographs are connected to the network control center (NCC) 11 EECS 1000 located in the control room (on the 1MC8 back panel, near 1IEEVD 1000). The NCC provides a centralized location for: on-line system monitoring (including continuous self-checking of significant functions and power supply status); data retrieval from each accelerograph; data transfer (download) to the dedicated system computer 1 IEECO 9000 for required analysis purposes (i.e., analysis required following a seismic event); system status indications (associated with the NCC and all five accelerographs);
The radiation monitoring instrumentation channels for plant operations shown in Table 16.7-10-1 shall be FUNCTIONAL.
date/time synchronization (for each accelerograph); and generation of a common "start recording" trigger command (to all accelerographs) in the event that a trigger acceleration threshold is exceeded. System failures will result in an alarm condition on the NCC and a remote alarm sent to the Unit 1 Operator Aid Computer.
As shown in Table 16.7-10-1.
The two upper containment accelerographs (1IEEVD 1030 and 1IEEVD 1040) were excluded from the CHANNEL CHECK required by TR 16.7-2-1, since they are not used to generate the Operating Basis Earthquake (OBE) exceedance signal (indicated by the Unit 1 control room annunciator system).
REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more radiation A.1 Adjust the setpoint to 4 hours monitoring channels within the limit.Alarm/Trip setpoint for plant operations OR exceeding the value shown in Table 16.7 A.2 Declare the channel non- 4 hours 1. functional.(continued)
The other three accelerographs were chosen since they are either: 1) located at the base of a Category 1 structure (1IEEVD 1010 and 1IEEVD 1020), consistent with measurement locations per Regulatory Guide 1.12 guidance; or 2) within the control room area (11 EEVD 1000), to confirm that the seismic event was felt by operators.
Catawba Units 1 and 2 16.7-10-1 Revision 3 Radiation Monitoring for Plant Operations 16.7-10 REMEDIAL ACTIONS (continued)
REFERENCES           1.     10 CFR Part 100, Appendix A.
CONDITION REQUIRED ACTION COMPLETION TIME B. One Containment Atmosphere
: 2.     Regulatory Guide 1.12, "Nuclear Power Plant Instrumentation for Earthquakes", Revision 2, March 1997.
-High Gaseous Radioactivity (EMF-39 -Low Range)channel non-functional.
: 3.     Catawba Updated Final Safety Analysis Report, Section 3.7.4, "Seismic Instrumentation Program".
B.1 ---------NOTE------
Catawba Units 1 and 2                     16.7-2-4                             Revision 3
In order to utilize Required Action B. 1, the following conditions must be satisfied:
 
: 1. The affected unit is not in MODES 1, 2, 3, or 4.2. EMF-36 is FUNCTIONAL and in service for the affected unit.3. The Reactor Coolant System for the affected unit has been vented.4. Either the reactor vessel head is in place (bolts are not required), or if it is not in place, either: (a) all irradiated fuel assemblies have been removed from containment, or (b) the lifting of heavy loads over the reactor vessel and the movement of irradiated fuel assemblies within containment have been suspended.
Radiation Monitoring for Plant Operations 16.7-10 16.7   INSTRUMENTATION 16.7-10         Radiation Monitoring for Plant Operations COMMITMENT             The radiation monitoring instrumentation channels for plant operations shown in Table 16.7-10-1 shall be FUNCTIONAL.
12 hours (continued)
APPLICABILITY:          As shown in Table 16.7-10-1.
Restore the non-functional channel to FUNCTIONAL status.'Catawba Units 1 and 2 16.7-10-2 Revision 3 Radiation Monitoring for Plant Operations 16.7-10 REMEDIAL ACTIONS CONDITION REQUIRED ACTION. COMPLETION TIME B. (continued)
REMEDIAL ACTIONS CONDITION                       REQUIRED ACTION                 COMPLETION TIME A.     One or more radiation       A.1     Adjust the setpoint to         4 hours monitoring channels                 within the limit.
OR B.2 -------- NOTE-------
Alarm/Trip setpoint for plant operations             OR exceeding the value shown in Table 16.7     A.2     Declare the channel non-       4 hours
: 1.                                   functional.
(continued)
Catawba Units 1 and 2                     16.7-10-1                               Revision 3
 
Radiation Monitoring for Plant Operations 16.7-10 REMEDIAL ACTIONS (continued)
CONDITION                   REQUIRED ACTION                   COMPLETION TIME B. One Containment         B.1   --------- NOTE------
Atmosphere - High              In order to utilize Required Gaseous Radioactivity          Action B. 1, the following (EMF Low Range)            conditions must be channel non-functional.        satisfied:
: 1. The affected unit is not in MODES 1, 2, 3, or 4.
: 2. EMF-36 is FUNCTIONAL and in service for the affected unit.
: 3. The Reactor Coolant System for the affected unit has been vented.
: 4. Either the reactor vessel head is in place (bolts are not required),
or if it is not in place, either: (a) all irradiated fuel assemblies have been removed from containment, or (b) the lifting of heavy loads over the reactor vessel and the movement of irradiated fuel assemblies within containment have been suspended.
Restore the non-functional         12 hours channel to FUNCTIONAL status.'
(continued)
Catawba Units 1 and 2             16.7-10-2                                 Revision 3
 
Radiation Monitoring for Plant Operations 16.7-10 REMEDIAL ACTIONS CONDITION           REQUIRED ACTION.               COMPLETION TIME B.   (continued)   OR B.2   -------- NOTE-------
In order to utilize Required Action B.2, the following conditions must be satisfied:
In order to utilize Required Action B.2, the following conditions must be satisfied:
: 1. The affected unit is not in, MODES 1, 2, 3, 4, 5, or 6.2. EMF-36 is FUNCTIONAL and in service for the affected unit.3. The reactor vessel head is in place (bolts are not required).
: 1. The affected unit is not in, MODES 1, 2, 3, 4, 5, or 6.
Restore .the non-functional 30 days chan njel to FUNCTIONAL status.(continued)
: 2. EMF-36 is FUNCTIONAL and in service for the affected unit.
Catawba Units 1 and 2 16.7-10-3 Revision 3 Radiation Monitoring for Plant Operations 16.7-10 REMEDIAIL ACTIONS (continued)
: 3. The reactor vessel head is in place (bolts are not required).
__,__.....
Restore .the non-functional   30 days chan njel to FUNCTIONAL status.
CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Close the Containment Immediately associated Completion Purge and Exhaust (VP)Time of Condition B not valves.met.OR Required Action B.1 or B.2 not utilized.D. One Control Room Air D.1 Initiate action to restore Immediately Intake -Radiation Level non-functional channel(s)
(continued)
-High Gaseous to FUNCTIONAL status.Radioactivity (EMF-43A& B -Low Range) AND channel non-functional in one or both control D.2 Ensure that one Control 1 hour room intakes. Room Area Ventilation System (CRAVS) train is in operation.
Catawba Units 1 and 2     16.7-10-3                               Revision 3
E. One Fuel Storage Pool E.1 Provide a portable Immediately Area -Criticality  
 
-continuous monitor with Radiation Level (1 EMF- the same Alarm Setpoint in 15, 2EMF-4) channel the fuel storage pool area.non-functional.
Radiation Monitoring for Plant Operations 16.7-10 REMEDIAIL ACTIONS (continued)                                         __,__.....
AND E.2.1 Restore non-functional 30 days monitor to FUNCTIONAL status.OR E.2.2 Suspend all operations 30 days involving fuel movement in the fuel building.(continued)
CONDITION                   REQUIRED ACTION                 COMPLETION TIME C. Required Action and     C.1   Close the Containment           Immediately associated Completion           Purge and Exhaust (VP)
Catawba Units 1 and 2 16.7-10-4 Revision 3 Radiation Monitoring for Plant Operations 16.7-10 REMEDIAL ACTIONS (continued)
Time of Condition B not         valves.
_ _ _.__ _ _ _CONDITION REQUIRED ACTION COMPLETION TIME F. One Fuel Storage Pool F.1 Verify the requirements in Immediately Area -High Gaseous Technical Specification Radioactivity (EMF-42) 3.7.13, Fuel Handling channel non-functional.
met.
Ventilation Exhaust System (FHVES), are met.OR F.2 Suspend all operations Immediately involving fuel movement in the fuel building.G. One Auxiliary Building G.1 Ensure one Auxiliary Immediately Ventilation  
OR Required Action B.1 or B.2 not utilized.
-High Building Filtered Ventilation Gaseous Radioactivity Exhaust System (ABFVES)(EMF-41) channel non- train is OPERABLE and in functional.
D. One Control Room Air     D.1   Initiate action to restore       Immediately Intake - Radiation Level       non-functional channel(s)
operation.
      - High Gaseous                 to FUNCTIONAL status.
H. One Component H.1 Collect and analyze grab Once per 12 hours Cooling Water System samples for principal (EMF-46A & B) channel gamma emitters (listed in non-functional.
Radioactivity (EMF-43A
Table 16.11-1-1, NOTE 3)at a lower limit of detection of no more than 5x10-7 p.Ci/mI.AND H.2 Restore non-functional 30 days channel to FUNCTIONAL status.(continued)
      & B - Low Range)         AND channel non-functional in one or both control   D.2     Ensure that one Control         1 hour room intakes.                   Room Area Ventilation System (CRAVS) train is in operation.
Catawba Units 1 and 2 16.7-10-5 Revision 3 Radiation Monitoring for Plant Operations 16.7-10 REMEDIAL ACTIONS (continued)  
E. One Fuel Storage Pool   E.1     Provide a portable             Immediately Area - Criticality -           continuous monitor with Radiation Level (1 EMF-         the same Alarm Setpoint in 15, 2EMF-4) channel             the fuel storage pool area.
'__ _ _ ....CONDITION REQUIRED ACTION COMPLETION TIME One or more N-16 1.1 Ensure that the Condenser Immediately Leakage Monitor (EMF- Evacuation System Noble 71, 72, 73, & 74) Gas Activity Monitor (EMF-channels non-functional.  
non-functional.
: 33) is FUNCTIONAL and in operation.
AND E.2.1   Restore non-functional         30 days monitor to FUNCTIONAL status.
OR 1.2 Ensure that Required Immediately Actions are met per SLC 16.11-7 if the Condenser Evacuation System Noble Gas Activity Monitor (EMF-33) is non-functional or not in operation.
OR E.2.2   Suspend all operations         30 days involving fuel movement in the fuel building.
Catawba Units 1 and 2 16.7-10-6 Revision 3 Radiation Monitoring for Plant Operations 16.7-10 TESTING REQUIREMENTS-NOTE-Refer to Table 16.7-10-1 to-determine which TRs apply for each Radiation Monitoring for Plant Operations channel.TEST FREQUENCY ,TR 16.7-10-1 Perform CHANNEL CHECK. 12 hours TR 16.7-10-2 Perform CHANNEL OPERATIONAL TEST. 9 months TR 16.7-10-3 Perform CHANNEL CALIBRATION.
(continued)
18 months Catawba Units 1 and 2 16.7-10-7 Revision 3 Radiation Monitoring for Plant Operations 16.7-10 Table 16.T-10-1 Radiation Monitoring Instrumentation for Plant Operations MONITOR APPLICABLE REQUIRED ALARM/TRIP TESTING MODES CHANNELS SETPOINT REQUIREMENTS
Catawba Units 1 and 2               16.7-10-4                                     Revision 3
: 1. Containment Atmosphere-At all times 1 Note (a) TR 16.7-10-1 High Gaseous TR 16.7-10-2 Radioactivity TR 16.7-10-3 (EMF-39 -Low Range)2. Fuel Storage Pool Areas -With irradiated 1< 1.7 x 10 -4 4Ci/ml TR 16.7-10-1 High Gaseous fuel in the fuel TR 16.7-10-2 Radioactivity storage pool TR 16.7-10-3 (EMF-42) areas 3. Fuel Storage Pool Areas -With fuel in the < 15 mR/h TR 16.7-10-1 Criticality  
 
-Radiation Level fuel storage pool TR 16.7-10-2 (Fuel Bridge -1EMF-15, areas TR 16.7-10-3 2EMF-4)4. Control Room Air Intake -At all times 2 (1/intake) 1.7 x 10-4 pCi/mI TR 16.7-10-1 Radiation Level -High TR 16.7-10-2 Gaseous Radioactivity TR 16.7-10-3 (EMF-43A & B -Low Range)5. Auxiliary Building 1,2,3,4 1 1.7 x 10-4 4Ci/ml TR 16.7-10-1 Ventilation  
Radiation Monitoring for Plant Operations 16.7-10 REMEDIAL ACTIONS (continued)   _     _     _.__                         _       _     _
-High Gaseous TR 16.7-10-2 Radioactivity TR 16.7-10-3 (EMF-41)6. Component Cooling Water At all times 1 (b) < 1 x 10"3 p-Ci/ml TR 16.7-10-1 System TR 16.7-10-2 (EMF-46A & B) TR 16.7-10-3 7. N-16 Leakage Monitor 1(40-100%
CONDITION                      REQUIRED ACTION               COMPLETION TIME F. One Fuel Storage Pool   F.1     Verify the requirements in     Immediately Area - High Gaseous             Technical Specification Radioactivity (EMF-42)           3.7.13, Fuel Handling channel non-functional.         Ventilation Exhaust System (FHVES), are met.
4 (1/steamline)
OR F.2     Suspend all operations         Immediately involving fuel movement in the fuel building.
Note (c) TR 16.7-10-1 (EMF-71, 72,73, & 74) reactor power) TR 16.7-10-2 TR 16.7-10-3 Catawba Units 1 and 2 16.7-10-8 Revision 3 Radiation Monitoring for Plant Operations 16.7-10 Table 167'-10-1 Notes (a) When venting or purging from containment to the atmosphere, the trip setpoint shall not exceed the equivalent limits of SLC 16.11-6 in accordance with the methodology and parameters in the ODCM. When not venting or purging in Modes 5 or 6, the alarm setpoint concentration (pCi/ml) shall be such that the actual submersion dose rate would not exceed 5 mR/hr without alarm. When not venting or purging in Modes 1 through 4, the alarm setpoint shall be no more than 3 times the containment atmosphere activity as indicated by the radiation monitor.(b) For EMF-46A & B: The EMF monitor associated with the operating Component Cooling Water System train shall be FUNCTIONAL.
G. One Auxiliary Building   G.1     Ensure one Auxiliary           Immediately Ventilation - High               Building Filtered Ventilation Gaseous Radioactivity           Exhaust System (ABFVES)
This requirement is based on the existence of an interlock which blocks the EMF loss of flow alarm from being received in the control room when the associated train pump motor(s) are not running.(c) The setpoint is as required by the primary to secondary leak rate monitoring program.Catawba Units 1 and 2 16.7-10-9 Revision 3 Radiation Monitoring for Plant Operations 16.7-10 BASES The FUNCTIONALITY of the radiation monitoring instrumentation for plant operations ensures that: (1) the associated action will be initiated when the radiation level monitored by each channel or combination thereof reaches its setpoint, (2) the specified coincidence logic is maintained, and (3) sufficient redundancy is maintained to permit a channel to be out of service for testing or maintenance.
(EMF-41) channel non-           train is OPERABLE and in functional.                     operation.
The radiation monitors for plant operations senses radiation levels in selected plant systems and locations and determines whether or not predetermined limits are being exceeded.
H. One Component           H.1     Collect and analyze grab       Once per 12 hours Cooling Water System             samples for principal (EMF-46A & B) channel           gamma emitters (listed in non-functional.                 Table 16.11-1-1, NOTE 3) at a lower limit of detection of no more than 5x10-7 p.Ci/mI.
The radiation monitors send actuation signals to initiate alarms or automatic isolation action and actuation of emergency exhaust or ventilation systems. Some of the final actuations are dependent on plant condition in addition to the actuation signals from the radiation monitors.Operation of the Component Cooling Water System (KC) Train A with the Train A Radiation Monitoring Systeml(EMF) monitor non-functional and relying'on the Train B EMF monitor for detection of radioactivity is not permissible.
AND H.2     Restore non-functional         30 days channel to FUNCTIONAL status.
Likewise, operation of the KC Train B with the Train B EMF monitor non-functional and relying on the Train A EMF monitor for detection of radioactivity is not permissible.
(continued)
This is due to the' interlock between the EMF monitor low-flow alarm and the operation of the KC pump motors on the same train. The EMF monitor in the operating KC pump train must be FUNCTIONAL, or the compensatory measures taken as specified.
Catawba Units 1 and 2               16.7-10-5                               Revision 3
Initiation of the Containment Purge Exhaust System (CPES) with EMF-39 non-functional is not permissible.
 
The basis for Required Actions B.1 and B.2 is to allow the continued operation of the CPES with EMF-39 initially FUNCTIONAL.
Radiation Monitoring for Plant Operations 16.7-10 REMEDIAL ACTIONS (continued)                           _      _ '__ ....
Continued operation of the CPES is contingent upon the ability of the affected unit to meet the requirements as noted in Required Actions B.1 and B.2.REFERENCES  
CONDITION                   REQUIRED ACTION                     COMPLETION TIME One or more N-16         1.1     Ensure that the Condenser         Immediately Leakage Monitor (EMF-           Evacuation System Noble 71, 72, 73, & 74)               Gas Activity Monitor (EMF-channels non-functional.         33) is FUNCTIONAL and in operation.
: 1. Letter from NRC to Gary R. Peterson, Duke, Issuance of Improved Technical Specifications Amendments for Catawba, September 30, 1998.Catawba Units I and 2 16.7-10-10 Revision 3 Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 16.11 RADIOLOGICAL EFFLUENTS CONTROLS 16.11-7 Radioactive Gaseous Effluent Monitoring Instrumentation COMMITMENT The Radioactive Gaseous Effluent Monitoring Instrumentation channels shown in Table 16.11-7-1 shall be FUNCTIONAL with their Alarm/Trip Setpoints set to ensure that the limits of SLC 16.11-6 are not exceeded.AND The Alarm/Trip Setpoints of these channels shall be determined and adjusted in accordance with the methodology and parameters in the OFFSITE DOSE CALCULATION MANUAL (ODCM).APPLICABILITY:
OR 1.2     Ensure that Required             Immediately Actions are met per SLC 16.11-7 if the Condenser Evacuation System Noble Gas Activity Monitor (EMF-
As shown in Table 16.11-7-1.
: 33) is non-functional or not in operation.
REMEDIAL ACTIONS---------------------
Catawba Units 1 and 2               16.7-10-6                                 Revision 3
NOTE Separate Condition entry is allowed for each Function.CONDITION REQUIRED ACTION COMPLETION TIME A. One or more A.1 Suspend the release of Immediately Radioactive Gaseous radioactive gaseous Effluent Monitoring effluents monitored by the Instrumentation affected channel(s).
 
channel(s)
Radiation Monitoring for Plant Operations 16.7-10 TESTING REQUIREMENTS
Alarm/Trip Setpoint less OR conservative than required.
                                          -NOTE-Refer to Table 16.7-10-1 to-determine which TRs apply for each Radiation Monitoring for Plant Operations channel.
A.2 Declare the channel(s)
TEST                                     FREQUENCY
Immediately non-functional.
,TR 16.7-10-1 Perform CHANNEL CHECK.                                     12 hours TR 16.7-10-2 Perform CHANNEL OPERATIONAL TEST.                           9 months TR 16.7-10-3 Perform CHANNEL CALIBRATION.                               18 months Catawba Units 1 and 2                 16.7-10-7                             Revision 3
B. One or more B.1 Enter the applicable Immediately Radioactive Gaseous Conditions and Required Effluent Monitoring Actions specified in Table Instrumentation 16.11-7-1 for the channel(s) non- channel(s).
 
functional.(continued)
Radiation Monitoring for Plant Operations 16.7-10 Table 16.T-10-1 Radiation Monitoring Instrumentation for Plant Operations MONITOR               APPLICABLE           REQUIRED               ALARM/TRIP             TESTING MODES           CHANNELS                 SETPOINT           REQUIREMENTS
Catawba Units 1 and 2 16.11-7-1 Revision 4 Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS !(continued)
: 1. Containment Atmosphere-           At all times             1                 Note (a)           TR 16.7-10-1 High Gaseous                                                                                       TR 16.7-10-2 Radioactivity                                                                                     TR 16.7-10-3 (EMF Low Range)
CONDITION REQUIRED ACTION COMPLETION TIME C. One channel non-functional.
: 2. Fuel Storage Pool Areas -       With irradiated             1<             1.7 x 10 -4 4Ci/ml     TR 16.7-10-1 High Gaseous                   fuel in the fuel                                                   TR 16.7-10-2 Radioactivity                   storage pool                                                     TR 16.7-10-3 (EMF-42)                             areas
C.1 Verify that EMF-36 (Low Range) is FUNCTIONAL.
: 3. Fuel Storage Pool Areas -       With fuel in the                             < 15 mR/h           TR 16.7-10-1 Criticality - Radiation Level fuel storage pool                                                   TR 16.7-10-2 (Fuel Bridge - 1EMF-15,               areas                                                       TR 16.7-10-3 2EMF-4)
OR C.2.1 Analyze two independent samples of the tank's contents.AND C.2.2 Perform independent verification of the discharge line valving.AND C.2.3.1 Perform independent verification of manual portion of the computer input for release rate calculations performed by computer.OR C.2.3.2Perform independent verification of entire calculations for release rate calculations performed manually.AND C.2.4 Restore channel to FUNCTIONAL status.OR C.3 Suspend release of radioactive effluents via this pathway.Prior to initiating a release Prior to initiating a release Prior to initiating a release Prior to initiating a release Prior to initiating a release 14 days Immediately (continued)
: 4. Control Room Air Intake -         At all times       2 (1/intake)       *1.7 x 10-4 pCi/mI       TR 16.7-10-1 Radiation Level - High                                                                             TR 16.7-10-2 Gaseous Radioactivity                                                                             TR 16.7-10-3 (EMF-43A & B - Low Range)
Catawba Units 1 and 2 16.11-7-2 Revision 4 Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL-AG-TIONS (continued)CONDITION REQUIRED ACTION COMPLETION TIME D. One or more flow rate D.1 Estimate the flow rate of Once per 4 hours measurement device the release. during releases channel(s) non-functional.
: 5. Auxiliary Building                 1,2,3,4                 1               1.7 x 10-4 4Ci/ml     TR 16.7-10-1 Ventilation - High Gaseous                                                                         TR 16.7-10-2 Radioactivity                                                                                     TR 16.7-10-3 (EMF-41)
AND D.2 Restore channel to 30 days FUNCTIONAL status.E. One or more Noble Gas E.1 Obtain grab samples from Once per 12 hours Activity Monitor effluent pathway. during releases channel(s) non-functional.
: 6. Component Cooling Water           At all times             1 (b)           < 1 x 10"3 p-Ci/ml     TR 16.7-10-1 System                                                                                             TR 16.7-10-2 (EMF-46A & B)                                                                                     TR 16.7-10-3
AND E.2 Perform an analysis of Within 24 hours of grab samples for obtaining the sample radioactivity.
: 7. N-16 Leakage Monitor             1(40-100%         4 (1/steamline)             Note (c)           TR 16.7-10-1 (EMF-71, 72,73, & 74)           reactor power)                                                     TR 16.7-10-2 TR 16.7-10-3 Catawba Units 1 and 2                               16.7-10-8                                     Revision 3
AND E.3 Restore channel to 30 days FUNCTIONAL status.(continued)
 
Catawba Units 1 and 2:16.11-7-3 Revision 4 Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS (continued)
Radiation Monitoring for Plant Operations 16.7-10 Table 167'-10-1 Notes (a)   When venting or purging from containment to the atmosphere, the trip setpoint shall not exceed the equivalent limits of SLC 16.11-6 in accordance with the methodology and parameters in the ODCM. When not venting or purging in Modes 5 or 6, the alarm setpoint concentration (pCi/ml) shall be such that the actual submersion dose rate would not exceed 5 mR/hr without alarm. When not venting or purging in Modes 1 through 4, the alarm setpoint shall be no more than 3 times the containment atmosphere activity as indicated by the radiation monitor.
CONDITION REQUIRED ACTION COMPLETION TIME F. Noble Gas Activity Monitor (EMF-39 -Low Range) providing automatic termination of release non-functional.
(b)   For EMF-46A & B: The EMF monitor associated with the operating Component Cooling Water System train shall be FUNCTIONAL. This requirement is based on the existence of an interlock which blocks the EMF loss of flow alarm from being received in the control room when the associated train pump motor(s) are not running.
F.1 ---------NOTE-------
(c)   The setpoint is as required by the primary to secondary leak rate monitoring program.
In order to utilize Required Action F.1, the following conditions must be satisfied:
Catawba Units 1 and 2                               16.7-10-9                                           Revision 3
: 1. The affected unit is not in MODES 1, 2, 3, or 4.2. EMF-36.is FUNCTIONAL and in service for the affected unit.3. The Reactor Coolant System for the affected unit has been vented.4. Either the reactor vessel head is in place (bolts are not required), or if it is not in place, either: (a) all irradiated fuel assemblies have been removed from containment, or (b) the lifting of heavy loads over the reactor vessel and the movement of irradiated fuel assemblies within containment have been suspended.
 
Restore the non-functional channel to FUNCTIONAL status.12 hours (continued)
Radiation Monitoring for Plant Operations 16.7-10 BASES               The FUNCTIONALITY of the radiation monitoring instrumentation for plant operations ensures that: (1) the associated action will be initiated when the radiation level monitored by each channel or combination thereof reaches its setpoint, (2) the specified coincidence logic is maintained, and (3) sufficient redundancy is maintained to permit a channel to be out of service for testing or maintenance. The radiation monitors for plant operations senses radiation levels in selected plant systems and locations and determines whether or not predetermined limits are being exceeded. The radiation monitors send actuation signals to initiate alarms or automatic isolation action and actuation of emergency exhaust or ventilation systems. Some of the final actuations are dependent on plant condition in addition to the actuation signals from the radiation monitors.
Catawba Units 1 and 2 16.11-7-4 Revision 4 Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME F. (continued)
Operation of the Component Cooling Water System (KC) Train A with the Train A Radiation Monitoring Systeml(EMF) monitor non-functional and relying'on the Train B EMF monitor for detection of radioactivity is not permissible. Likewise, operation of the KC Train B with the Train B EMF monitor non-functional and relying on the Train A EMF monitor for detection of radioactivity is not permissible. This is due to the' interlock between the EMF monitor low-flow alarm and the operation of the KC pump motors on the same train. The EMF monitor in the operating KC pump train must be FUNCTIONAL, or the compensatory measures taken as specified.
OR F.2.1 Provide a portable Continuous Air Monitor (CAM) on the operating deck of containment.
Initiation of the Containment Purge Exhaust System (CPES) with EMF-39 non-functional is not permissible. The basis for Required Actions B.1 and B.2 is to allow the continued operation of the CPES with EMF-39 initially FUNCTIONAL. Continued operation of the CPES is contingent upon the ability of the affected unit to meet the requirements as noted in Required Actions B.1 and B.2.
AND F.2.2 --------NOTE-------
REFERENCES           1.       Letter from NRC to Gary R. Peterson, Duke, Issuance of Improved Technical Specifications Amendments for Catawba, September 30, 1998.
Catawba Units I and 2                   16.7-10-10                             Revision 3
 
Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 16.11 RADIOLOGICAL EFFLUENTS CONTROLS 16.11-7       Radioactive Gaseous Effluent Monitoring Instrumentation COMMITMENT           The Radioactive Gaseous Effluent Monitoring Instrumentation channels shown in Table 16.11-7-1 shall be FUNCTIONAL with their Alarm/Trip Setpoints set to ensure that the limits of SLC 16.11-6 are not exceeded.
AND The Alarm/Trip Setpoints of these channels shall be determined and adjusted in accordance with the methodology and parameters in the OFFSITE DOSE CALCULATION MANUAL (ODCM).
APPLICABILITY:       As shown in Table 16.11-7-1.
REMEDIAL ACTIONS
                      --------------------- NOTE Separate Condition entry is allowed for each Function.
CONDITION                         REQUIRED ACTION               COMPLETION TIME A. One or more                 A.1     Suspend the release of       Immediately Radioactive Gaseous                 radioactive gaseous Effluent Monitoring                 effluents monitored by the Instrumentation                     affected channel(s).
channel(s) Alarm/Trip Setpoint less               OR conservative than required.                   A.2     Declare the channel(s)       Immediately non-functional.
B. One or more                 B.1     Enter the applicable         Immediately Radioactive Gaseous                 Conditions and Required Effluent Monitoring                 Actions specified in Table Instrumentation                     16.11-7-1 for the channel(s) non-                     channel(s).
functional.
(continued)
Catawba Units 1 and 2                   16.11-7-1                             Revision 4
 
Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS !(continued)
CONDITION                   REQUIRED ACTION             COMPLETION TIME C. One channel non-       C.1     Verify that EMF-36 (Low     Prior to initiating a functional.                    Range) is FUNCTIONAL.       release OR C.2.1   Analyze two independent     Prior to initiating a samples of the tank's       release contents.
AND C.2.2 Perform independent           Prior to initiating a verification of the         release discharge line valving.
AND C.2.3.1 Perform independent         Prior to initiating a verification of manual     release portion of the computer input for release rate calculations performed by computer.
OR C.2.3.2Perform independent         Prior to initiating a verification of entire     release calculations for release rate calculations performed manually.
AND C.2.4   Restore channel to         14 days FUNCTIONAL status.
OR C.3     Suspend release of         Immediately radioactive effluents via this pathway.
(continued)
Catawba Units 1 and 2             16.11-7-2                             Revision 4
 
Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL-AG-TIONS (continued)                                                 *,:*
CONDITION                   REQUIRED ACTION             COMPLETION TIME D. One or more flow rate D.1     Estimate the flow rate of Once per 4 hours measurement device             the release.               during releases channel(s) non-functional.           AND D.2     Restore channel to         30 days FUNCTIONAL status.
E. One or more Noble Gas E.1     Obtain grab samples from   Once per 12 hours Activity Monitor               effluent pathway.         during releases channel(s) non-functional.           AND E.2     Perform an analysis of     Within 24 hours of grab samples for           obtaining the sample radioactivity.
AND E.3     Restore channel to         30 days FUNCTIONAL status.
(continued)
Catawba Units 1 and 2             :16.11-7-3                           Revision 4
 
Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS (continued)
CONDITION                     REQUIRED ACTION                 COMPLETION TIME F. Noble Gas Activity       F.1   --------- NOTE-------
Monitor (EMF Low            In order to utilize Required Range) providing                Action F.1, the following automatic termination of        conditions must be release non-functional.          satisfied:
: 1. The affected unit is not in MODES 1, 2, 3, or 4.
: 2. EMF-36.is FUNCTIONAL and in service for the affected unit.
: 3. The Reactor Coolant System for the affected unit has been vented.
: 4. Either the reactor vessel head is in place (bolts are not required),
or if it is not in place, either: (a) all irradiated fuel assemblies have been removed from containment, or (b) the lifting of heavy loads over the reactor vessel and the movement of irradiated fuel assemblies within containment have been suspended.
Restore the non-functional     12 hours channel to FUNCTIONAL status.
(continued)
Catawba Units 1 and 2               16.11-7-4                               Revision 4
 
Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS CONDITION                     REQUIRED ACTION                 COMPLETION TIME F.   (continued)               OR F.2.1   Provide a portable             Immediately Continuous Air Monitor (CAM) on the operating deck of containment.
AND F.2.2 -------- NOTE-------
In order to utilize Required Action F.2, the following conditions must be satisfied:
In order to utilize Required Action F.2, the following conditions must be satisfied:
: 1. The affected unit is not in MODES 1, 2, 3, 4, 5, or 6.2. EMF-36 is FUNCTIONAL and in service for the affected unit.3. The reactor vessel head is in place (bolts are not required).
: 1. The affected unit is not in MODES 1, 2, 3, 4, 5, or 6.
Immediately 30 days Restore the non-functional channel to FUNCTIONAL status.f I.G. Required Action and associated Completion Time of Condition F not met.OR Required Action F.1 or F.2.1 and F.2.2 not utilized.G.1 Suspend PURGING of radioactive effluents via this pathway.Immediately (continued)
: 2. EMF-36 is FUNCTIONAL and in service for the affected unit.
Catawba Units 1 and 2 16.11-7-5 Revision 4 Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS (continued)
: 3. The reactor vessel head is in place (bolts are not required).
_-_ _CONDITION REQUIRED ACTION COMPLETION TIME H. One or more sampler H. 1 Perform sampling with Continuously channel(s) non- auxiliary sampling functional.
Restore the non-functional     30 days channel to FUNCTIONAL status.
equipment as required by Table 16.11-6-1.
f                                     I.
AND H.2 Restore channel to 30 days FUNCTIONAL status.One Condenser 1.1 ----------
G. Required Action and       G.1    Suspend PURGING of              Immediately associated Completion             radioactive effluents via Time of Condition F not           this pathway.
NOTE -------Evacuation System Applicable to effluent Noble Gas Activity releases via the Condenser Monitor (EMF-33) Steam Air Ejector (ZJ)channel non-functional.
met.
System.Obtain grab samples from Once per 12 hours effluent pathway. during releases AND 1.2 ----------
OR Required Action F.1 or F.2.1 and F.2.2 not utilized.
NOTE-------
(continued)
Applicable to effluent releases via the Condenser Steam Air Ejector (ZJ)System.Perform an analysis of Within 24 hours of grab samples for obtaining the sample radioactivity.
Catawba Units 1 and 2               16.11-7-5                               Revision 4
 
Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS (continued)                                       _-_               _
CONDITION                    REQUIRED ACTION             COMPLETION TIME H. One or more sampler     H. 1     Perform sampling with       Continuously channel(s) non-                 auxiliary sampling functional.                     equipment as required by Table 16.11-6-1.
AND H.2     Restore channel to         30 days FUNCTIONAL status.
One Condenser           1.1   ---------- NOTE -------
Evacuation System               Applicable to effluent Noble Gas Activity               releases via the Condenser Monitor (EMF-33)                 Steam Air Ejector (ZJ) channel non-functional.         System.
Obtain grab samples from   Once per 12 hours effluent pathway.           during releases AND 1.2   ---------- NOTE-------
Applicable to effluent releases via the Condenser Steam Air Ejector (ZJ)
System.
Perform an analysis of     Within 24 hours of grab samples for           obtaining the sample radioactivity.
AND (continued)
AND (continued)
Catawba Units 1 and 2 16.11-7-6 Revision 4 Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME I. (continued) 1.3 ----------
Catawba Units 1 and 2               16.11-7-6                           Revision 4
NOTE--------
 
Applicable to effluent releases via the Steam Generator Blowdown (BB)System atmospheric vent valve (BB-27) in the off-normal mode.Perform an analysis of grab samples for radioactivity at a lower limit of detection of 10-7 microCurie/ml.
Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS CONDITION                     REQUIRED ACTION                 COMPLETION TIME I.   (continued)             1.3   ---------- NOTE--------
AND 1.4 Restore channel to FUNCTIONAL status.Once per 12 hours during releases when secondary specific activity is >0.01 microCurie/gm DOSE EQUIVALENT 1-131 AND Once per 24 hours during releases when secondary specific activity is <0.01 microCurie/gm DOSE EQUIVALENT 1-131 30 days J. Noble Gas Activity Monitor (EMF-39 -Low Range) providing automatic termination of release non-functional.
Applicable to effluent releases via the Steam Generator Blowdown (BB)
J.1 Verify that EMF-36 is FUNCTIONAL., OR J.2.1 Analyze two independent samples of the containment atmosphere.
System atmospheric vent valve (BB-27) in the off-normal mode.
AND Prior to initiating a release Prior to initiating a release (continued)
Perform an analysis of         Once per 12 hours grab samples for               during releases radioactivity at a lower limit when secondary of detection of 10-7           specific activity is >
Catawba Units 1 and 2 16.11-7-7 Revision 4 Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME J. (continued)
microCurie/ml.                 0.01 microCurie/gm DOSE EQUIVALENT 1-131 AND Once per 24 hours during releases when secondary specific activity is <
J.2.2 Perform independent verification of the discharge line valving.AND J.2.3.1 Perform independent verification of manual portion of the computer input for release rate calculations performed by computer.OR J.2.3.2 Perform independent verification of entire calculations for release rate calculations performed manually.AND J.2.4 ---------NOTE-------
0.01 microCurie/gm DOSE EQUIVALENT 1-131 AND 1.4      Restore channel to            30 days FUNCTIONAL status.
If channel remains or is anticipated to remain non-functional for > 90 days, re-evaluate the configuration of the affected unit in accordance with the applicable portions of 10 CFR 50.59 and 10 CFR 50.65(a)(4) prior to expiration of the 90-day period.Prior to initiating a release Prior to initiating a release Prior to initiating a release 30 days Restore channel to FUNCTIONAL status.(continued)
J. Noble Gas Activity       J.1      Verify that EMF-36 is          Prior to initiating a Monitor (EMF Low             FUNCTIONAL.,                  release Range) providing automatic termination of OR release non-functional.
Catawba Units 1 and 2 16.11-7-8 Revision 4 Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS (continued)
J.2.1   Analyze two independent       Prior to initiating a samples of the                 release containment atmosphere.
_ __._I CONDITION REQUIRED ACTION COMPLETION TIME K. Required Action and K.1 Explain why the non- In the next associated Completion functionality was not scheduled Time of Condition C, D, corrected within the Radioactive Effluent E, F, H, I, or J not met. specified Completion Time. Release Report pursuant to Technical Specification  
AND (continued)
Catawba Units 1 and 2               16.11-7-7                               Revision 4
 
Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS CONDITION           REQUIRED ACTION               COMPLETION TIME J.   (continued)   J.2.2   Perform independent         Prior to initiating a verification of the         release discharge line valving.
AND J.2.3.1 Perform independent           Prior to initiating a verification of manual       release portion of the computer input for release rate calculations performed by computer.
OR J.2.3.2 Perform independent           Prior to initiating a verification of entire       release calculations for release rate calculations performed manually.
AND J.2.4 --------- NOTE-------
If channel remains or is anticipated to remain non-functional for > 90 days, re-evaluate the configuration of the affected unit in accordance with the applicable portions of 10 CFR 50.59 and 10 CFR 50.65(a)(4) prior to expiration of the 90-day period.
Restore channel to           30 days FUNCTIONAL status.
(continued)
Catawba Units 1 and 2     16.11-7-8                             Revision 4
 
Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS (continued)                                                                                                                                 _       __._I CONDITION                                                                               REQUIRED ACTION             COMPLETION TIME K.                           Required Action and                                                                     K.1     Explain why the non-       In the next associated Completion                                                                           functionality was not       scheduled Time of Condition C, D,                                                                         corrected within the       Radioactive Effluent E, F, H, I, or J not met.                                                                       specified Completion Time. Release Report pursuant to Technical Specification 5.6.3 TESTING REQUIREMENTS Refer to Table 16.11-7-1 to determine which TRs apply for each Radioactive Gaseous Effluent Monitoring Instrumentation channel.
TEST                                        FREQUENCY TR 16.11-7-1 Perform CHANNEL CHECK.                                                                                                                          Prior to each release TR 16.11-7-2                                                              ------------------- NOTE                                  ------------------
For Instruments la, 4, and 5, a SOURCE CHECK for these channels shall be the qualitative assessment of channel response when the channel sensor is exposed to a light-emitting diode.
Perform SOURCE CHECK.                                                                              Prior to each release TR 16.11-7-3 Perform CHANNEL CHECK.                                                                                                                          12 hours TR 16.11-7-4 Perform CHANNEL CHECK.                                                                                                                          24 hours TR 16.11-7-5 Perform CHANNEL CHECK.                                                                                                                          7 days (continued)
Catawba Units 1 and 2                                                                                                        16.11-7-9                              Revision 4
 
Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 TESTING REQUIREMENTS (continued)
TEST                                      FREQUENCY TR 16.11-7-6      ------------------- NOTE        ------------------
For Instruments 2 and 3a, a SOURCE CHECK for these channels shall be the qualitative assessment of channel response when the channel sensor is exposed to a light-emitting diode.
Perform SOURCE CHECK.                                        31 days TR 16.11-7-7      ------------------- NOTE            ------------------
For Instruments Ia, 2, 3a, 5, and 6a, the COT shall also demonstrate, as applicable, that automatic isolation of this pathway and control room alarm annunciation (for EMF-58, alarm annunciation is in the Monitor Tank Building control room and on the Monitor Tank Building control panel remote annunciator panel) occur if any of the following conditions exist:
: a.      Instrument indicates measured levels above the Alarm/Trip Setpoint, or
: b.      Circuit failure/instrument downscale failure (alarm only)
Perform COT.                                                  9 months TR 16.11-7-8      ------------------- NOTE--            ----------------
For Instrument 4, the COT shall also demonstrate that automatic isolation of this pathway and control room alarm annunciation occur if any of the following conditions exist:
: a.      Instrument indicates measured levels above the Alarm/Trip Setpoint, or
: b.      Circuit failure/instrument downscale failure (alarm only)
Perform COT.                                                  18 months (continued)
Catawba Units 1 and 2                  16.11-7-10                            Revision 4
 
Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 TESTING REQUIREMENTS (continued)
TEST                                      FREQUENCY TR 16.11-7-9 -------------- - -NOTE                  -----------------
For Instruments la, 2, 3a, 4, 5, and 6a, the initial CHANNEL CALIBRATION shall be performed using one or more of the reference standards certified by the National Bureau of Standards (NBS) or using standards that have been obtained from suppliers that participate in measurement assurance activities with NBS. These standards shall permit calibrating the system over its intended range of energy and measurement range. For subsequent CHANNEL CALIBRATION, sources that have been related to the initial calibration shall be used.
Perform CHANNEL CALIBRATION.                                18 months Catawba Units 1 and 2                16.11-7-11                            Revision 4
 
Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 Table 16.11-7-1 Radioactive Gaseous Effluent Monitoring Instrumentation (page 1 of 2)
INSTRUMENT                                  REQUIRED      CONDITIONS      APPLICABLE            TESTING CHANNELS                        MODES            REQUIREMENTS
: 1. Waste Gas Holdup System 1.a  Noble Gas Activity Monitor - Providing 1 per station    A, C, K  At all times except      TR 16.11-7-1 Alarm and Automatic Termination of                                when the isolation      TR 16.11-7-2 Release                                                          valve is closed and      TR 16.11-7-7 (EMF Low Range)                                                      locked          TR 16.11-7-9 1 .b Effluent System Flow Rate Measuring    1 per station      D, K    At all times except      TR 16.11-7-1 Device                                                            when the isolation      TR 16.11-7-9 valve is closed and locked
: 2. Condenser Evacuation System Noble            1          A, I, K  When air ejectors      TR 16.11-7-3 Gas Activity Monitor                                                are in operation      TR 16.11-7-6 (EMF-33) (BB-27 is only isolation                                  (Apply Required        TR 16.11-7-7 function required) (Note 1)                                      Action 1.3 when air      TR 16.11-7-9 ejectors are not in operation)
: 3. Vent System 3.a Noble Gas Activity Monitor                    1          A, E, K        At all times        TR 16.11-7-4 (EMF Low Range)                                                                      TR 16.11-7-6 TR 16.11-7-7 TR 16.11-7-9 3.b Iodine Sampler                                1          A, H, K        At all times        TR 16.11-7-5 Eberline RAP-1 (RDM-PU-VPVP) 3.c Particulate Sampler                          1          A, H, K        At all times        TR 16.11-7-5 Ebedine RAP-1 (RDM-PU-VPVP) 3.d Unit Vent Stack Flow Rate Meter              1            D, K        At all times        TR 16.11-7-4 (no alarm/trip function)                                                                  TR 16.11-7-9 3.e Unit Vent Radiation Monitor Flow Meter        1            E, K        At all times        TR 16.11-7-4 TR 16.11-7-9
: 4. Containment Purge System Noble Gas          1        A, F, G, K  At all times below      TR 16.11-7-2 Activity Monitor - Providing Alarm and                                  MODE 4            TR 16.11-7-3 Automatic Termination of Release                                                          TR 16.11-7-8 (EMF Low Range)                                                                      TR 16.11-7-9 (continued)
Catawba Units 1 and 2                        16.11-7-12                                  Revision 4
 
Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 Table 16.11-7-1 Radioactive Gaseous Effluent Monitoring Instrumentation (page 2 of 2)
INSTRUMENT                                          REQUIRED          CONDITIONS          APPLICABLE          TESTING CHANNELS                                  MODES          REQUIREMENTS
: 5. Containment Air Release and Addition                  1              A, J, K          1, 2,3,4,5,6        TR 16.11-7-2 System Noble Gas Activity Monitor -                                                                        TR 16.11-7-3 Providing Alarm and Automatic                                                                              TR 16.11-7-7 Termination of Release                                                                                    TR 16.11-7-9 (EMF Low Range)
: 6. Monitor Tank Building HVAC 6.a Noble Gas Activity Monitor - Providing          1 per station        A, E, K          At all times      TR 16.11-7-4 Alarm                                                                                                      TR 16.11-7-6 (EMF Low Range)                                                                                      TR 16.11-7-7 TR 16.11-7-9 6.b Effluent Flow Rate Measuring Device            1 per station          D, K              At all times      TR 16.11-7-4 TR 16.11-7-9 Note 1: The setpoint is as required by the primary to secondary leak rate monitoring program.
Catawba Units 1 and 2                                16.11-7-13                                          Revision 4


====5.6.3 TESTING====
Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 BASES       The Radioactive Gaseous Effluent Monitoring Instrumentation is provided to monitor and control, as applicable, the releases of radioactive materials in gaseous effluents during actual or potential releases of gaseous effluents. The Alarm/Trip Setpoints for these instruments shall be calculated and adjusted in accordance with the methodology and parameters in the ODCM to ensure that the Alarm/Trip will occur prior to exceeding the limits of 10 CFR Part 20. The FUNCTIONALITY and use of this instrumentation is consistent with the requirements of General Design Criteria 60, 63, and 64 of Appendix A to 10 CFR Part 50. The sensitivity of any noble gas activity monitor used to show compliance with the gaseous effluent release requirements of SLC 16.11-8 shall be such that concentrations as low as 1 x 10-6 pCi/cc are measurable.
REQUIREMENTS Refer to Table 16.11-7-1 to determine which TRs apply for each Radioactive Gaseous Effluent Monitoring Instrumentation channel..........................................................................................................................
Initiation of the Containment Purge Exhaust System (CPES) with EMF-39 non-functional is not permissible. The basis for Required Actions F.1 and F.2.1 and F.2.2 is to allow the continued operation of the CPES with EMF-39 initially FUNCTIONAL. Continued operation of the CPES is contingent upon the ability of the affected unit to meet the requirements as noted in Required Actions F.1 and F.2.1 and F.2.2.
TEST FREQUENCY TR 16.11-7-1 Perform CHANNEL CHECK. Prior to each release TR 16.11-7-2
REFERENCES             1. Catawba Offsite Dose Calculation Manual.
-------------------
: 2.     10 CFR Part 20.
NOTE ------------------
Catawba Units 1 and 2                 16.11-7-14                             Revision 4}}
For Instruments la, 4, and 5, a SOURCE CHECK for these channels shall be the qualitative assessment of channel response when the channel sensor is exposed to a light-emitting diode.Perform SOURCE CHECK. Prior to each release TR 16.11-7-3 Perform CHANNEL CHECK. 12 hours TR 16.11-7-4 Perform CHANNEL CHECK. 24 hours TR 16.11-7-5 Perform CHANNEL CHECK. 7 days (continued)
Catawba Units 1 and 2 16.11-7-9 Revision 4 Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 TESTING REQUIREMENTS (continued)
TEST FREQUENCY TR 16.11-7-6
-------------------
NOTE ------------------
For Instruments 2 and 3a, a SOURCE CHECK for these channels shall be the qualitative assessment of channel response when the channel sensor is exposed to a light-emitting diode.Perform SOURCE CHECK. 31 days TR 16.11-7-7
-------------------
NOTE ------------------
For Instruments Ia, 2, 3a, 5, and 6a, the COT shall also demonstrate, as applicable, that automatic isolation of this pathway and control room alarm annunciation (for EMF-58, alarm annunciation is in the Monitor Tank Building control room and on the Monitor Tank Building control panel remote annunciator panel) occur if any of the following conditions exist: a. Instrument indicates measured levels above the Alarm/Trip Setpoint, or b. Circuit failure/instrument downscale failure (alarm only)Perform COT. 9 months TR 16.11-7-8
-------------------
NOTE-- ----------------
For Instrument 4, the COT shall also demonstrate that automatic isolation of this pathway and control room alarm annunciation occur if any of the following conditions exist: a. Instrument indicates measured levels above the Alarm/Trip Setpoint, or b. Circuit failure/instrument downscale failure (alarm only)Perform COT. 18 months (continued)
Catawba Units 1 and 2 16.11-7-10 Revision 4 Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 TESTING REQUIREMENTS (continued)
TEST FREQUENCY TR 16.11-7-9--------------
--NOTE -----------------
For Instruments la, 2, 3a, 4, 5, and 6a, the initial CHANNEL CALIBRATION shall be performed using one or more of the reference standards certified by the National Bureau of Standards (NBS) or using standards that have been obtained from suppliers that participate in measurement assurance activities with NBS. These standards shall permit calibrating the system over its intended range of energy and measurement range. For subsequent CHANNEL CALIBRATION, sources that have been related to the initial calibration shall be used.Perform CHANNEL CALIBRATION.
18 months Catawba Units 1 and 2 16.11-7-11 Revision 4 Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 Table 16.11-7-1 Radioactive Gaseous Effluent Monitoring Instrumentation (page 1 of 2)INSTRUMENT REQUIRED CONDITIONS APPLICABLE TESTING CHANNELS MODES REQUIREMENTS
: 1. Waste Gas Holdup System 1.a Noble Gas Activity Monitor -Providing 1 per station A, C, K At all times except TR 16.11-7-1 Alarm and Automatic Termination of when the isolation TR 16.11-7-2 Release valve is closed and TR 16.11-7-7 (EMF-50 -Low Range) locked TR 16.11-7-9 1 .b Effluent System Flow Rate Measuring 1 per station D, K At all times except TR 16.11-7-1 Device when the isolation TR 16.11-7-9 valve is closed and locked 2. Condenser Evacuation System Noble 1 A, I, K When air ejectors TR 16.11-7-3 Gas Activity Monitor are in operation TR 16.11-7-6 (EMF-33) (BB-27 is only isolation (Apply Required TR 16.11-7-7 function required) (Note 1) Action 1.3 when air TR 16.11-7-9 ejectors are not in operation)
: 3. Vent System 3.a Noble Gas Activity Monitor 1 A, E, K At all times TR 16.11-7-4 (EMF-36 -Low Range) TR 16.11-7-6 TR 16.11-7-7 TR 16.11-7-9 3.b Iodine Sampler 1 A, H, K At all times TR 16.11-7-5 Eberline RAP-1 (RDM-PU-VPVP) 3.c Particulate Sampler 1 A, H, K At all times TR 16.11-7-5 Ebedine RAP-1 (RDM-PU-VPVP) 3.d Unit Vent Stack Flow Rate Meter 1 D, K At all times TR 16.11-7-4 (no alarm/trip function)
TR 16.11-7-9 3.e Unit Vent Radiation Monitor Flow Meter 1 E, K At all times TR 16.11-7-4 TR 16.11-7-9 4. Containment Purge System Noble Gas 1 A, F, G, K At all times below TR 16.11-7-2 Activity Monitor -Providing Alarm and MODE 4 TR 16.11-7-3 Automatic Termination of Release TR 16.11-7-8 (EMF-39 -Low Range) TR 16.11-7-9 (continued)
Catawba Units 1 and 2 16.11-7-12 Revision 4 Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 Table 16.11-7-1 Radioactive Gaseous Effluent Monitoring Instrumentation (page 2 of 2)INSTRUMENT REQUIRED CONDITIONS APPLICABLE TESTING CHANNELS MODES REQUIREMENTS
: 5. Containment Air Release and Addition 1 A, J, K 1, 2,3,4,5,6 TR 16.11-7-2 System Noble Gas Activity Monitor -TR 16.11-7-3 Providing Alarm and Automatic TR 16.11-7-7 Termination of Release TR 16.11-7-9 (EMF-39 -Low Range)6. Monitor Tank Building HVAC 6.a Noble Gas Activity Monitor -Providing 1 per station A, E, K At all times TR 16.11-7-4 Alarm TR 16.11-7-6 (EMF-58 -Low Range) TR 16.11-7-7 TR 16.11-7-9 6.b Effluent Flow Rate Measuring Device 1 per station D, K At all times TR 16.11-7-4 TR 16.11-7-9 Note 1: The setpoint is as required by the primary to secondary leak rate monitoring program.Catawba Units 1 and 2 16.11-7-13 Revision 4 Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 BASES The Radioactive Gaseous Effluent Monitoring Instrumentation is provided to monitor and control, as applicable, the releases of radioactive materials in gaseous effluents during actual or potential releases of gaseous effluents.
The Alarm/Trip Setpoints for these instruments shall be calculated and adjusted in accordance with the methodology and parameters in the ODCM to ensure that the Alarm/Trip will occur prior to exceeding the limits of 10 CFR Part 20. The FUNCTIONALITY and use of this instrumentation is consistent with the requirements of General Design Criteria 60, 63, and 64 of Appendix A to 10 CFR Part 50. The sensitivity of any noble gas activity monitor used to show compliance with the gaseous effluent release requirements of SLC 16.11-8 shall be such that concentrations as low as 1 x 10-6 pCi/cc are measurable.
Initiation of the Containment Purge Exhaust System (CPES) with EMF-39 non-functional is not permissible.
The basis for Required Actions F.1 and F.2.1 and F.2.2 is to allow the continued operation of the CPES with EMF-39 initially FUNCTIONAL.
Continued operation of the CPES is contingent upon the ability of the affected unit to meet the requirements as noted in Required Actions F.1 and F.2.1 and F.2.2.REFERENCES
: 1. Catawba Offsite Dose Calculation Manual.2. 10 CFR Part 20.Catawba Units 1 and 2 16.11-7-14 Revision 4}}

Latest revision as of 03:21, 12 March 2020

Selected Licensee Commitments Manual, Revision Date 11/23/09
ML100740371
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 02/25/2010
From: Aldridge B
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DUK100560042
Download: ML100740371 (35)


Text

PRIORITY PTHE DISPOSITION OF THE TRANSMITTAL SIGNATURE DOCUMENT ORIGINAL UNLESS WILL BEISTO RECIPIENT Date: - 02/25/10 OTHERWISE IDENTIFIED BELOW Document Transmittal #: DUK100560042

1) 03759 US NUC REG WASHINGTON, DC
2) 03796 SCIENTECH DUNEDIN, FL Duke Energy QA CONDITION [] Yes
  • No
3) 03833 CNS COMPL FILE (ORIG)X CN01 RC DOCUMENT TRANSMITTAL FORM OTHER ACKNOWLEDGEMENT REQUIRED
  • Yes
4) 03945 OPS TRAINING CT01A IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE
5) 04446 ME HENSHAW EC08H ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:

REFERENCE

6) 04490 C T KIKER CT01A
7) 04552 LE HAYNES EC07F CATAWBA NUCLEAR STATION Duke Energy
8) 05160 P TVU MG01RC SELECTED LICENSEE COMMITMENTS 4800 Concord Road
9) 05309 R L EDMOND CT01A Document Management
10) 05327 LP BYERS CN02OP CN04DM York, South Carolina 29745
11) 05328 CNS OPS REF LIBRARY CN02OP
12) 05330 CNS PLANT ENGINEERING CN03CE
13) 05339 CNS RP SHIFT OFFICE CN02RP
14) 05342 CNS SECURITY LIBRARY CN01SC
15) 05512 CNS REG. COMP. MGR CN01RC Rec'd By Page 3 of 4 Date DOCUMENT NO QA COND REV #/DATE DISTR CODE 1 2 3 4 51 6 7 8 9 10 11 12 13 14 15 TOTAL LOES (4 PAGES) NA 045 02/23/10 CADM-03 V10 Vl X V26 vi V1 V1 Vi V1 V3 V1 V1 V1 v'1 vi 87 CHAPTER 16.7-2 NA 003 02/25/10 CHAPTER 16.7-10 NA 003 02/25/10 CHAPTER 16.11-7 NA 004 02/25/10 REMARKS: PLEASE REFER TO THE ATTACHED MEMO FOR FILING INSTRUCTIONS. J R MORRIS VICE PRESIDENT CATAWBA NUCLEAR STATION BY:

BALDRIDGE CN01SA BA/RBE

hDuke Energy.

Catawba Nuclear Station DUKE CORPORATION ENERGY Rd.

4800 Concord York, SC 29745 February 23, 2010 Re- Catawba Nuclear Station Selected Licensee Commitments Manual Revision Date: 11/23/09 Attached are revisions to the Catawba Nuclear Station Selected Licensee Commitments Manual. Please remove and replace the following pages:

REMOVE THESE PAGES INSERT THESE PAGES LIST OF EFFECTIVE SECTIONS Pages 1 through 4 Pages 1 through 4 Revision 44 Revision 45 TAB 16.7 SLC 16.7-2 SLC 16.7-2 Revision 2 Revision 3 SLC 16.7-10 SLC 16.7-10 Revision 2 Revision 3 www. duke-energy. com

TAB 16.11 SLC 16.11-7 SLC 16.11-7 Revision 3 Revision 4 Ifyou have any questions concerning the contents of this package update, contact Betty Aldridge at (803)701-3758.

Manager, Regulatory Compliance Attachment

LIST OF EFFECTIVE SECTIONS SECTION REVISION NUMBER REVISION DATE TABLE OF CONTENTS 12 06/08/09 16.1 1 08/27/08 16.2 2 08/21/09 16.3 1 08/21/09 16.5-1 1 10/24/06 16.5-2 Deleted 16.5-3 1 02/20/04 16.5-4 0 10/09/02 16.5-5 1 01/28/10 16.5-6 1 08/21/09 16.5-7 0 10/09/02 16.5-8 2 12/22/08 16.5-9 0 10/24/06 16.5-10 Deleted 16.6-1 0 10/09/02 16.6-2 Deleted 16.6-3 1 08/21/09 16.6-4 1 08/21/09 16.6-5 1 08/21/09 16.7-1 1 08/21/09 16.7-2 3 11/23/09 16.7-3 1 08/21/09 16.7-4 2 08/21/09 16.7-5 2 08/21/09 Catawba Units 1 and 2 Page 1 Revision 45

LIST OF EFFECTIVE SECTIONS SECTION REVISION NUMBER REVISION DATE 16.7-6 2 08/21/09 16.7-7 1 08/21/09 16.7-8 2 08/21/09 16.7-9 5 08/21/09 16.7-10 3 11/23/09 16.7-11 1 08/21/09 16.7-12 1 08/21/09 16.7-13 2 08/21/09 16.7-14 1 08/21/09 16.7-15 1 08/21/09 16.7-16 0 06/08/09 16.8-1 3 08/21/09 16.8-2 1 10/24/06 16.8-3 1 10/24/06 16.8-4 2 11/05/07 16.8-5 3 08/21/09 16.9-1 5 08/21/09 16.9-2 4 08/21/09 16.9-3 1 08/21/09 16.9-4 3 08/21/09 16.9-5 5 08/21/09 16.9-6 7 08/21/09 16.9-7 4 08/21/09 16.9-8 5 08/21/09 Catawba Units 1 and 2 Page-2 Revision 45

LIST OF EFFECTIVE SECTIONS SECTION REVISION NUMBER REVISION DATE 16.9-9 3 08/21/09 16.9-10 5 08/21/09 16.9-11 3 08/21/09 16.9-12 2 08/21/09 16.9-13 3 08/21/09 16.9-14 1 09/25/06 16.9-15 2 08/21/09 16.9-16 2 08/21/09 16.9-17 0 10/09/02 16.9-18 0 10/09/02 16.9-19 2 08/21/09 16.9-20 0 10/09/02 16.9-21 0 10/09/02 16.9-22 1 08/21/09 16.9-23 3 08/21/09 16.9-24 2 10/24/06 16.9-25 2 08/21/09 16.10-1 1 08/21/09 16.10-2 1 10/24/06 16.10-3 1 08/21/09 16.11-1 0 10/09/02 16.11-2 2 08/21/09 16.11-3 0 10/09/02 16.11-4 1 08/21/09

)

Catawba Units 1 and 2 Page 3 Revision 45

LIST OF EFFECTIVE SECTIONS SECTION REVISION NUMBER REVISION DATE 16.11-5 0 10/09/02 1 06/08/09 16.11-6 16.11-7 4 11/23109 16.11-8 0 10/09/02 16.11-9 0 10/09/02 16.11-10 1 08/21/09 16.11-11 1 03/20/03 16.11-12 0 10/09/02 16.11-13 0 10/09/02 16.11-14 0 10/09/02 16.11-15 0 10/09/02 16.11-16 0 10/09/02 16.11-17 0 10/09/02 16.11-18 1 08/21/09 16.11-19 0 10/09/02 16.11-20 1 08/21/09 16.11-21 0 10/09/02 16.12-1 0 10/09/02 16.13-1 0 10/09/02 16.13-2 Deleted 16.13-3 Deleted 16.13-4 0 10/09/02 Catawba Units 1 and 2 Page 4 Revision 45

Seismic Instrumentation 16.7-2

. 16.7 INSTRUMENTATION 16.7-2 Seismic Instrumentation COMMITMENT The seismic monitoring instrumentation shown in Table 16.7-2-1 shall be FUNCTIONAL.

APPLICABILITY: At all times.

REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Restore non-functional 30 days seismic monitoring instrument(s) to instrument(s) non- FUNCTIONAL status.

functional.

OR A.2 Prepare and submit a 40 days Special Report to the Commission outlining the cause of the malfunction, and the plans for restoring the instrument(s) to FUNCTIONAL status.

B. Accessible seismic. B.1 Restore instrument(s) to Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> monitoring instrument(s) FUNCTIONAL status. following the seismic actuated during a event seismic event > 0.01 g.

AND B.2 Retrieve data from! Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> actuated instrument(s) and following the seismic analyze to determine event magnitude of vibratory ground motion.

AND (continued)

Catawba Units 1 and 2 16.7-2-1 Revision 3

Seismic Instrumentation 16.7-2 REM ED IAL ACTIO NS ...... _

CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.3 Prepare and submit a 10 days Special Report to the Commission describing the magnitude, frequency spectrum, and resultant effect upon facility features important to safety.

TESTING REQUIREMENTS


NOTE ------------------------------

Refer to Table 16.7-2-1 to determine which TRs apply for each seismic instrument.

TEST FREQUENCY TR 16.7-2-1 -------------------- NOTE-------------------

CHANNEL CHECK not required for seismic trigger of lIEEVD 1030 or 1IEEVD 1040.

Perform CHANNEL CHECK. 14 days for first 3 months of service after initial system startup AND 31 days thereafte TR 16.7-2-2 Perform COT. 6 months TR 16.7-2-3 Perform CHANNEL CALIBRATION. 18 months Catawba Units 1 and 2 16.7-2-2 Revision 3

Seismic Instrumentation 16.7-2 Table 16.7-2-1 Seismic Monitoring Instrumentation INSTRUMENTS AND SENSOR MEASUREMENT REQUIRED TESTING LOCATIONS RANGE CHANNELS REQUIREMENTS

1. Triaxial Accelerographs 1.a 1IEEVD 1020 (Remote -2 g to +2 g 1(1) TR 16.7-2-1 Sensor A) Unit 1 TR 16.7-2-2 Containment Base Slab TR 16.7-2-3 Elev. 553' 0" 1.b 11EEVD 1010 (Remote -2 g to +2 g 1m TR 16.7-2-1 Sensor B) Unit 1 AFW TR 16.7-2-2 Pump Room Elev. 544' TR 16.7-2-3 0"

1.c 1IEEVD 1000 Control -2 g to +2 g i1 1 TR 16.7-2-1 Room Elev. 595' 0" TR 16.7-2-2 TR 16.7-2-3 1.d 1IEEVD 1030 Unit 1 -2,g to +2 g i1 1 TR 16.7-2-2 Containment Bldg. Elev.. TR 16.7-2-3 652' 0", Azimuth 00 i.e IIEEVD 1040 Unit 1 -2 g to +2 g i1 1 TR 16.7-2-2 Containment Bldg. Elev.. TR 16.7-2-3 612' 10", Azimuth 0Q (1) With reactor control room indication.

Catawba Units 1 and 2 16.7-2-3 Revision 3

Seismic Instrumentation 16.7-2 BASES The FUNCTIONALITY of the seismic monitoring instrumentation ensures that sufficient capability is available to promptly determine the magnitude of a seismic event and evaluate the response of those features important to safety. This capability is required to permit comparison of the measured response to that used in the design basis for the facility to determine if plant shutdown is required pursuant to Appendix A of 10 CFR Part 100. The instrumentation is consistent with the recommendations of Regulatory Guide 1.12, "Nuclear Power Plant Instrumentation for Earthquakes", Revision 2.

The seismic monitoring instrumentation system records seismic data acquired by five triaxial accelerographs (at locations per Table 16.7-2-1, Items 1.a through 1 .e); each accelerograph consists of a solid state recording device (using static random access memory (SDRAM) storage) and an integral micro electro-mechanical sensor (or MEMS accelerometer).

All five accelerographs are connected to the network control center (NCC) 11 EECS 1000 located in the control room (on the 1MC8 back panel, near 1IEEVD 1000). The NCC provides a centralized location for: on-line system monitoring (including continuous self-checking of significant functions and power supply status); data retrieval from each accelerograph; data transfer (download) to the dedicated system computer 1 IEECO 9000 for required analysis purposes (i.e., analysis required following a seismic event); system status indications (associated with the NCC and all five accelerographs);

date/time synchronization (for each accelerograph); and generation of a common "start recording" trigger command (to all accelerographs) in the event that a trigger acceleration threshold is exceeded. System failures will result in an alarm condition on the NCC and a remote alarm sent to the Unit 1 Operator Aid Computer.

The two upper containment accelerographs (1IEEVD 1030 and 1IEEVD 1040) were excluded from the CHANNEL CHECK required by TR 16.7-2-1, since they are not used to generate the Operating Basis Earthquake (OBE) exceedance signal (indicated by the Unit 1 control room annunciator system).

The other three accelerographs were chosen since they are either: 1) located at the base of a Category 1 structure (1IEEVD 1010 and 1IEEVD 1020), consistent with measurement locations per Regulatory Guide 1.12 guidance; or 2) within the control room area (11 EEVD 1000), to confirm that the seismic event was felt by operators.

REFERENCES 1. 10 CFR Part 100, Appendix A.

2. Regulatory Guide 1.12, "Nuclear Power Plant Instrumentation for Earthquakes", Revision 2, March 1997.
3. Catawba Updated Final Safety Analysis Report, Section 3.7.4, "Seismic Instrumentation Program".

Catawba Units 1 and 2 16.7-2-4 Revision 3

Radiation Monitoring for Plant Operations 16.7-10 16.7 INSTRUMENTATION 16.7-10 Radiation Monitoring for Plant Operations COMMITMENT The radiation monitoring instrumentation channels for plant operations shown in Table 16.7-10-1 shall be FUNCTIONAL.

APPLICABILITY: As shown in Table 16.7-10-1.

REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more radiation A.1 Adjust the setpoint to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> monitoring channels within the limit.

Alarm/Trip setpoint for plant operations OR exceeding the value shown in Table 16.7 A.2 Declare the channel non- 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />

1. functional.

(continued)

Catawba Units 1 and 2 16.7-10-1 Revision 3

Radiation Monitoring for Plant Operations 16.7-10 REMEDIAL ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One Containment B.1 --------- NOTE------

Atmosphere - High In order to utilize Required Gaseous Radioactivity Action B. 1, the following (EMF Low Range) conditions must be channel non-functional. satisfied:

1. The affected unit is not in MODES 1, 2, 3, or 4.
2. EMF-36 is FUNCTIONAL and in service for the affected unit.
3. The Reactor Coolant System for the affected unit has been vented.
4. Either the reactor vessel head is in place (bolts are not required),

or if it is not in place, either: (a) all irradiated fuel assemblies have been removed from containment, or (b) the lifting of heavy loads over the reactor vessel and the movement of irradiated fuel assemblies within containment have been suspended.

Restore the non-functional 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> channel to FUNCTIONAL status.'

(continued)

Catawba Units 1 and 2 16.7-10-2 Revision 3

Radiation Monitoring for Plant Operations 16.7-10 REMEDIAL ACTIONS CONDITION REQUIRED ACTION. COMPLETION TIME B. (continued) OR B.2 -------- NOTE-------

In order to utilize Required Action B.2, the following conditions must be satisfied:

1. The affected unit is not in, MODES 1, 2, 3, 4, 5, or 6.
2. EMF-36 is FUNCTIONAL and in service for the affected unit.
3. The reactor vessel head is in place (bolts are not required).

Restore .the non-functional 30 days chan njel to FUNCTIONAL status.

(continued)

Catawba Units 1 and 2 16.7-10-3 Revision 3

Radiation Monitoring for Plant Operations 16.7-10 REMEDIAIL ACTIONS (continued) __,__.....

CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Close the Containment Immediately associated Completion Purge and Exhaust (VP)

Time of Condition B not valves.

met.

OR Required Action B.1 or B.2 not utilized.

D. One Control Room Air D.1 Initiate action to restore Immediately Intake - Radiation Level non-functional channel(s)

- High Gaseous to FUNCTIONAL status.

Radioactivity (EMF-43A

& B - Low Range) AND channel non-functional in one or both control D.2 Ensure that one Control 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> room intakes. Room Area Ventilation System (CRAVS) train is in operation.

E. One Fuel Storage Pool E.1 Provide a portable Immediately Area - Criticality - continuous monitor with Radiation Level (1 EMF- the same Alarm Setpoint in 15, 2EMF-4) channel the fuel storage pool area.

non-functional.

AND E.2.1 Restore non-functional 30 days monitor to FUNCTIONAL status.

OR E.2.2 Suspend all operations 30 days involving fuel movement in the fuel building.

(continued)

Catawba Units 1 and 2 16.7-10-4 Revision 3

Radiation Monitoring for Plant Operations 16.7-10 REMEDIAL ACTIONS (continued) _ _ _.__ _ _ _

CONDITION REQUIRED ACTION COMPLETION TIME F. One Fuel Storage Pool F.1 Verify the requirements in Immediately Area - High Gaseous Technical Specification Radioactivity (EMF-42) 3.7.13, Fuel Handling channel non-functional. Ventilation Exhaust System (FHVES), are met.

OR F.2 Suspend all operations Immediately involving fuel movement in the fuel building.

G. One Auxiliary Building G.1 Ensure one Auxiliary Immediately Ventilation - High Building Filtered Ventilation Gaseous Radioactivity Exhaust System (ABFVES)

(EMF-41) channel non- train is OPERABLE and in functional. operation.

H. One Component H.1 Collect and analyze grab Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Cooling Water System samples for principal (EMF-46A & B) channel gamma emitters (listed in non-functional. Table 16.11-1-1, NOTE 3) at a lower limit of detection of no more than 5x10-7 p.Ci/mI.

AND H.2 Restore non-functional 30 days channel to FUNCTIONAL status.

(continued)

Catawba Units 1 and 2 16.7-10-5 Revision 3

Radiation Monitoring for Plant Operations 16.7-10 REMEDIAL ACTIONS (continued) _ _ '__ ....

CONDITION REQUIRED ACTION COMPLETION TIME One or more N-16 1.1 Ensure that the Condenser Immediately Leakage Monitor (EMF- Evacuation System Noble 71, 72, 73, & 74) Gas Activity Monitor (EMF-channels non-functional. 33) is FUNCTIONAL and in operation.

OR 1.2 Ensure that Required Immediately Actions are met per SLC 16.11-7 if the Condenser Evacuation System Noble Gas Activity Monitor (EMF-

33) is non-functional or not in operation.

Catawba Units 1 and 2 16.7-10-6 Revision 3

Radiation Monitoring for Plant Operations 16.7-10 TESTING REQUIREMENTS

-NOTE-Refer to Table 16.7-10-1 to-determine which TRs apply for each Radiation Monitoring for Plant Operations channel.

TEST FREQUENCY

,TR 16.7-10-1 Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TR 16.7-10-2 Perform CHANNEL OPERATIONAL TEST. 9 months TR 16.7-10-3 Perform CHANNEL CALIBRATION. 18 months Catawba Units 1 and 2 16.7-10-7 Revision 3

Radiation Monitoring for Plant Operations 16.7-10 Table 16.T-10-1 Radiation Monitoring Instrumentation for Plant Operations MONITOR APPLICABLE REQUIRED ALARM/TRIP TESTING MODES CHANNELS SETPOINT REQUIREMENTS

1. Containment Atmosphere- At all times 1 Note (a) TR 16.7-10-1 High Gaseous TR 16.7-10-2 Radioactivity TR 16.7-10-3 (EMF Low Range)
2. Fuel Storage Pool Areas - With irradiated 1< 1.7 x 10 -4 4Ci/ml TR 16.7-10-1 High Gaseous fuel in the fuel TR 16.7-10-2 Radioactivity storage pool TR 16.7-10-3 (EMF-42) areas
3. Fuel Storage Pool Areas - With fuel in the < 15 mR/h TR 16.7-10-1 Criticality - Radiation Level fuel storage pool TR 16.7-10-2 (Fuel Bridge - 1EMF-15, areas TR 16.7-10-3 2EMF-4)
4. Control Room Air Intake - At all times 2 (1/intake) *1.7 x 10-4 pCi/mI TR 16.7-10-1 Radiation Level - High TR 16.7-10-2 Gaseous Radioactivity TR 16.7-10-3 (EMF-43A & B - Low Range)
5. Auxiliary Building 1,2,3,4 1 1.7 x 10-4 4Ci/ml TR 16.7-10-1 Ventilation - High Gaseous TR 16.7-10-2 Radioactivity TR 16.7-10-3 (EMF-41)
6. Component Cooling Water At all times 1 (b) < 1 x 10"3 p-Ci/ml TR 16.7-10-1 System TR 16.7-10-2 (EMF-46A & B) TR 16.7-10-3
7. N-16 Leakage Monitor 1(40-100% 4 (1/steamline) Note (c) TR 16.7-10-1 (EMF-71, 72,73, & 74) reactor power) TR 16.7-10-2 TR 16.7-10-3 Catawba Units 1 and 2 16.7-10-8 Revision 3

Radiation Monitoring for Plant Operations 16.7-10 Table 167'-10-1 Notes (a) When venting or purging from containment to the atmosphere, the trip setpoint shall not exceed the equivalent limits of SLC 16.11-6 in accordance with the methodology and parameters in the ODCM. When not venting or purging in Modes 5 or 6, the alarm setpoint concentration (pCi/ml) shall be such that the actual submersion dose rate would not exceed 5 mR/hr without alarm. When not venting or purging in Modes 1 through 4, the alarm setpoint shall be no more than 3 times the containment atmosphere activity as indicated by the radiation monitor.

(b) For EMF-46A & B: The EMF monitor associated with the operating Component Cooling Water System train shall be FUNCTIONAL. This requirement is based on the existence of an interlock which blocks the EMF loss of flow alarm from being received in the control room when the associated train pump motor(s) are not running.

(c) The setpoint is as required by the primary to secondary leak rate monitoring program.

Catawba Units 1 and 2 16.7-10-9 Revision 3

Radiation Monitoring for Plant Operations 16.7-10 BASES The FUNCTIONALITY of the radiation monitoring instrumentation for plant operations ensures that: (1) the associated action will be initiated when the radiation level monitored by each channel or combination thereof reaches its setpoint, (2) the specified coincidence logic is maintained, and (3) sufficient redundancy is maintained to permit a channel to be out of service for testing or maintenance. The radiation monitors for plant operations senses radiation levels in selected plant systems and locations and determines whether or not predetermined limits are being exceeded. The radiation monitors send actuation signals to initiate alarms or automatic isolation action and actuation of emergency exhaust or ventilation systems. Some of the final actuations are dependent on plant condition in addition to the actuation signals from the radiation monitors.

Operation of the Component Cooling Water System (KC) Train A with the Train A Radiation Monitoring Systeml(EMF) monitor non-functional and relying'on the Train B EMF monitor for detection of radioactivity is not permissible. Likewise, operation of the KC Train B with the Train B EMF monitor non-functional and relying on the Train A EMF monitor for detection of radioactivity is not permissible. This is due to the' interlock between the EMF monitor low-flow alarm and the operation of the KC pump motors on the same train. The EMF monitor in the operating KC pump train must be FUNCTIONAL, or the compensatory measures taken as specified.

Initiation of the Containment Purge Exhaust System (CPES) with EMF-39 non-functional is not permissible. The basis for Required Actions B.1 and B.2 is to allow the continued operation of the CPES with EMF-39 initially FUNCTIONAL. Continued operation of the CPES is contingent upon the ability of the affected unit to meet the requirements as noted in Required Actions B.1 and B.2.

REFERENCES 1. Letter from NRC to Gary R. Peterson, Duke, Issuance of Improved Technical Specifications Amendments for Catawba, September 30, 1998.

Catawba Units I and 2 16.7-10-10 Revision 3

Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 16.11 RADIOLOGICAL EFFLUENTS CONTROLS 16.11-7 Radioactive Gaseous Effluent Monitoring Instrumentation COMMITMENT The Radioactive Gaseous Effluent Monitoring Instrumentation channels shown in Table 16.11-7-1 shall be FUNCTIONAL with their Alarm/Trip Setpoints set to ensure that the limits of SLC 16.11-6 are not exceeded.

AND The Alarm/Trip Setpoints of these channels shall be determined and adjusted in accordance with the methodology and parameters in the OFFSITE DOSE CALCULATION MANUAL (ODCM).

APPLICABILITY: As shown in Table 16.11-7-1.

REMEDIAL ACTIONS


NOTE Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more A.1 Suspend the release of Immediately Radioactive Gaseous radioactive gaseous Effluent Monitoring effluents monitored by the Instrumentation affected channel(s).

channel(s) Alarm/Trip Setpoint less OR conservative than required. A.2 Declare the channel(s) Immediately non-functional.

B. One or more B.1 Enter the applicable Immediately Radioactive Gaseous Conditions and Required Effluent Monitoring Actions specified in Table Instrumentation 16.11-7-1 for the channel(s) non- channel(s).

functional.

(continued)

Catawba Units 1 and 2 16.11-7-1 Revision 4

Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS !(continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. One channel non- C.1 Verify that EMF-36 (Low Prior to initiating a functional. Range) is FUNCTIONAL. release OR C.2.1 Analyze two independent Prior to initiating a samples of the tank's release contents.

AND C.2.2 Perform independent Prior to initiating a verification of the release discharge line valving.

AND C.2.3.1 Perform independent Prior to initiating a verification of manual release portion of the computer input for release rate calculations performed by computer.

OR C.2.3.2Perform independent Prior to initiating a verification of entire release calculations for release rate calculations performed manually.

AND C.2.4 Restore channel to 14 days FUNCTIONAL status.

OR C.3 Suspend release of Immediately radioactive effluents via this pathway.

(continued)

Catawba Units 1 and 2 16.11-7-2 Revision 4

Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL-AG-TIONS (continued) *,:*

CONDITION REQUIRED ACTION COMPLETION TIME D. One or more flow rate D.1 Estimate the flow rate of Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> measurement device the release. during releases channel(s) non-functional. AND D.2 Restore channel to 30 days FUNCTIONAL status.

E. One or more Noble Gas E.1 Obtain grab samples from Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Activity Monitor effluent pathway. during releases channel(s) non-functional. AND E.2 Perform an analysis of Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of grab samples for obtaining the sample radioactivity.

AND E.3 Restore channel to 30 days FUNCTIONAL status.

(continued)

Catawba Units 1 and 2 :16.11-7-3 Revision 4

Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME F. Noble Gas Activity F.1 --------- NOTE-------

Monitor (EMF Low In order to utilize Required Range) providing Action F.1, the following automatic termination of conditions must be release non-functional. satisfied:

1. The affected unit is not in MODES 1, 2, 3, or 4.
2. EMF-36.is FUNCTIONAL and in service for the affected unit.
3. The Reactor Coolant System for the affected unit has been vented.
4. Either the reactor vessel head is in place (bolts are not required),

or if it is not in place, either: (a) all irradiated fuel assemblies have been removed from containment, or (b) the lifting of heavy loads over the reactor vessel and the movement of irradiated fuel assemblies within containment have been suspended.

Restore the non-functional 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> channel to FUNCTIONAL status.

(continued)

Catawba Units 1 and 2 16.11-7-4 Revision 4

Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME F. (continued) OR F.2.1 Provide a portable Immediately Continuous Air Monitor (CAM) on the operating deck of containment.

AND F.2.2 -------- NOTE-------

In order to utilize Required Action F.2, the following conditions must be satisfied:

1. The affected unit is not in MODES 1, 2, 3, 4, 5, or 6.
2. EMF-36 is FUNCTIONAL and in service for the affected unit.
3. The reactor vessel head is in place (bolts are not required).

Restore the non-functional 30 days channel to FUNCTIONAL status.

f I.

G. Required Action and G.1 Suspend PURGING of Immediately associated Completion radioactive effluents via Time of Condition F not this pathway.

met.

OR Required Action F.1 or F.2.1 and F.2.2 not utilized.

(continued)

Catawba Units 1 and 2 16.11-7-5 Revision 4

Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS (continued) _-_ _

CONDITION REQUIRED ACTION COMPLETION TIME H. One or more sampler H. 1 Perform sampling with Continuously channel(s) non- auxiliary sampling functional. equipment as required by Table 16.11-6-1.

AND H.2 Restore channel to 30 days FUNCTIONAL status.

One Condenser 1.1 ---------- NOTE -------

Evacuation System Applicable to effluent Noble Gas Activity releases via the Condenser Monitor (EMF-33) Steam Air Ejector (ZJ) channel non-functional. System.

Obtain grab samples from Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> effluent pathway. during releases AND 1.2 ---------- NOTE-------

Applicable to effluent releases via the Condenser Steam Air Ejector (ZJ)

System.

Perform an analysis of Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of grab samples for obtaining the sample radioactivity.

AND (continued)

Catawba Units 1 and 2 16.11-7-6 Revision 4

Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME I. (continued) 1.3 ---------- NOTE--------

Applicable to effluent releases via the Steam Generator Blowdown (BB)

System atmospheric vent valve (BB-27) in the off-normal mode.

Perform an analysis of Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> grab samples for during releases radioactivity at a lower limit when secondary of detection of 10-7 specific activity is >

microCurie/ml. 0.01 microCurie/gm DOSE EQUIVALENT 1-131 AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> during releases when secondary specific activity is <

0.01 microCurie/gm DOSE EQUIVALENT 1-131 AND 1.4 Restore channel to 30 days FUNCTIONAL status.

J. Noble Gas Activity J.1 Verify that EMF-36 is Prior to initiating a Monitor (EMF Low FUNCTIONAL., release Range) providing automatic termination of OR release non-functional.

J.2.1 Analyze two independent Prior to initiating a samples of the release containment atmosphere.

AND (continued)

Catawba Units 1 and 2 16.11-7-7 Revision 4

Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME J. (continued) J.2.2 Perform independent Prior to initiating a verification of the release discharge line valving.

AND J.2.3.1 Perform independent Prior to initiating a verification of manual release portion of the computer input for release rate calculations performed by computer.

OR J.2.3.2 Perform independent Prior to initiating a verification of entire release calculations for release rate calculations performed manually.

AND J.2.4 --------- NOTE-------

If channel remains or is anticipated to remain non-functional for > 90 days, re-evaluate the configuration of the affected unit in accordance with the applicable portions of 10 CFR 50.59 and 10 CFR 50.65(a)(4) prior to expiration of the 90-day period.

Restore channel to 30 days FUNCTIONAL status.

(continued)

Catawba Units 1 and 2 16.11-7-8 Revision 4

Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 REMEDIAL ACTIONS (continued) _ __._I CONDITION REQUIRED ACTION COMPLETION TIME K. Required Action and K.1 Explain why the non- In the next associated Completion functionality was not scheduled Time of Condition C, D, corrected within the Radioactive Effluent E, F, H, I, or J not met. specified Completion Time. Release Report pursuant to Technical Specification 5.6.3 TESTING REQUIREMENTS Refer to Table 16.11-7-1 to determine which TRs apply for each Radioactive Gaseous Effluent Monitoring Instrumentation channel.

TEST FREQUENCY TR 16.11-7-1 Perform CHANNEL CHECK. Prior to each release TR 16.11-7-2 ------------------- NOTE ------------------

For Instruments la, 4, and 5, a SOURCE CHECK for these channels shall be the qualitative assessment of channel response when the channel sensor is exposed to a light-emitting diode.

Perform SOURCE CHECK. Prior to each release TR 16.11-7-3 Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TR 16.11-7-4 Perform CHANNEL CHECK. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TR 16.11-7-5 Perform CHANNEL CHECK. 7 days (continued)

Catawba Units 1 and 2 16.11-7-9 Revision 4

Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 TESTING REQUIREMENTS (continued)

TEST FREQUENCY TR 16.11-7-6 ------------------- NOTE ------------------

For Instruments 2 and 3a, a SOURCE CHECK for these channels shall be the qualitative assessment of channel response when the channel sensor is exposed to a light-emitting diode.

Perform SOURCE CHECK. 31 days TR 16.11-7-7 ------------------- NOTE ------------------

For Instruments Ia, 2, 3a, 5, and 6a, the COT shall also demonstrate, as applicable, that automatic isolation of this pathway and control room alarm annunciation (for EMF-58, alarm annunciation is in the Monitor Tank Building control room and on the Monitor Tank Building control panel remote annunciator panel) occur if any of the following conditions exist:

a. Instrument indicates measured levels above the Alarm/Trip Setpoint, or
b. Circuit failure/instrument downscale failure (alarm only)

Perform COT. 9 months TR 16.11-7-8 ------------------- NOTE-- ----------------

For Instrument 4, the COT shall also demonstrate that automatic isolation of this pathway and control room alarm annunciation occur if any of the following conditions exist:

a. Instrument indicates measured levels above the Alarm/Trip Setpoint, or
b. Circuit failure/instrument downscale failure (alarm only)

Perform COT. 18 months (continued)

Catawba Units 1 and 2 16.11-7-10 Revision 4

Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 TESTING REQUIREMENTS (continued)

TEST FREQUENCY TR 16.11-7-9 -------------- - -NOTE -----------------

For Instruments la, 2, 3a, 4, 5, and 6a, the initial CHANNEL CALIBRATION shall be performed using one or more of the reference standards certified by the National Bureau of Standards (NBS) or using standards that have been obtained from suppliers that participate in measurement assurance activities with NBS. These standards shall permit calibrating the system over its intended range of energy and measurement range. For subsequent CHANNEL CALIBRATION, sources that have been related to the initial calibration shall be used.

Perform CHANNEL CALIBRATION. 18 months Catawba Units 1 and 2 16.11-7-11 Revision 4

Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 Table 16.11-7-1 Radioactive Gaseous Effluent Monitoring Instrumentation (page 1 of 2)

INSTRUMENT REQUIRED CONDITIONS APPLICABLE TESTING CHANNELS MODES REQUIREMENTS

1. Waste Gas Holdup System 1.a Noble Gas Activity Monitor - Providing 1 per station A, C, K At all times except TR 16.11-7-1 Alarm and Automatic Termination of when the isolation TR 16.11-7-2 Release valve is closed and TR 16.11-7-7 (EMF Low Range) locked TR 16.11-7-9 1 .b Effluent System Flow Rate Measuring 1 per station D, K At all times except TR 16.11-7-1 Device when the isolation TR 16.11-7-9 valve is closed and locked
2. Condenser Evacuation System Noble 1 A, I, K When air ejectors TR 16.11-7-3 Gas Activity Monitor are in operation TR 16.11-7-6 (EMF-33) (BB-27 is only isolation (Apply Required TR 16.11-7-7 function required) (Note 1) Action 1.3 when air TR 16.11-7-9 ejectors are not in operation)
3. Vent System 3.a Noble Gas Activity Monitor 1 A, E, K At all times TR 16.11-7-4 (EMF Low Range) TR 16.11-7-6 TR 16.11-7-7 TR 16.11-7-9 3.b Iodine Sampler 1 A, H, K At all times TR 16.11-7-5 Eberline RAP-1 (RDM-PU-VPVP) 3.c Particulate Sampler 1 A, H, K At all times TR 16.11-7-5 Ebedine RAP-1 (RDM-PU-VPVP) 3.d Unit Vent Stack Flow Rate Meter 1 D, K At all times TR 16.11-7-4 (no alarm/trip function) TR 16.11-7-9 3.e Unit Vent Radiation Monitor Flow Meter 1 E, K At all times TR 16.11-7-4 TR 16.11-7-9
4. Containment Purge System Noble Gas 1 A, F, G, K At all times below TR 16.11-7-2 Activity Monitor - Providing Alarm and MODE 4 TR 16.11-7-3 Automatic Termination of Release TR 16.11-7-8 (EMF Low Range) TR 16.11-7-9 (continued)

Catawba Units 1 and 2 16.11-7-12 Revision 4

Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 Table 16.11-7-1 Radioactive Gaseous Effluent Monitoring Instrumentation (page 2 of 2)

INSTRUMENT REQUIRED CONDITIONS APPLICABLE TESTING CHANNELS MODES REQUIREMENTS

5. Containment Air Release and Addition 1 A, J, K 1, 2,3,4,5,6 TR 16.11-7-2 System Noble Gas Activity Monitor - TR 16.11-7-3 Providing Alarm and Automatic TR 16.11-7-7 Termination of Release TR 16.11-7-9 (EMF Low Range)
6. Monitor Tank Building HVAC 6.a Noble Gas Activity Monitor - Providing 1 per station A, E, K At all times TR 16.11-7-4 Alarm TR 16.11-7-6 (EMF Low Range) TR 16.11-7-7 TR 16.11-7-9 6.b Effluent Flow Rate Measuring Device 1 per station D, K At all times TR 16.11-7-4 TR 16.11-7-9 Note 1: The setpoint is as required by the primary to secondary leak rate monitoring program.

Catawba Units 1 and 2 16.11-7-13 Revision 4

Radioactive Gaseous Effluent Monitoring Instrumentation 16.11-7 BASES The Radioactive Gaseous Effluent Monitoring Instrumentation is provided to monitor and control, as applicable, the releases of radioactive materials in gaseous effluents during actual or potential releases of gaseous effluents. The Alarm/Trip Setpoints for these instruments shall be calculated and adjusted in accordance with the methodology and parameters in the ODCM to ensure that the Alarm/Trip will occur prior to exceeding the limits of 10 CFR Part 20. The FUNCTIONALITY and use of this instrumentation is consistent with the requirements of General Design Criteria 60, 63, and 64 of Appendix A to 10 CFR Part 50. The sensitivity of any noble gas activity monitor used to show compliance with the gaseous effluent release requirements of SLC 16.11-8 shall be such that concentrations as low as 1 x 10-6 pCi/cc are measurable.

Initiation of the Containment Purge Exhaust System (CPES) with EMF-39 non-functional is not permissible. The basis for Required Actions F.1 and F.2.1 and F.2.2 is to allow the continued operation of the CPES with EMF-39 initially FUNCTIONAL. Continued operation of the CPES is contingent upon the ability of the affected unit to meet the requirements as noted in Required Actions F.1 and F.2.1 and F.2.2.

REFERENCES 1. Catawba Offsite Dose Calculation Manual.

2. 10 CFR Part 20.

Catawba Units 1 and 2 16.11-7-14 Revision 4