Distribution:
- 2. Catawba NRC
- 3. CNS - WCC/SSA
- 5. rn5 COMPL FILE (ORIG))(
- 12. CONTROL ROOM SSA
- 13. Mlronenko, Artur N
- 14. Woolweber, Bnan N 0ocumentm 2
UCN - CN - CNS-SU:-16.8 001-ISSUED R&AIE PILP UCN - CN - CNS-SLC-LOES- 087 - ISSUED R&Alf PILP UCN - CN - SLC Letter to Maooal Holders -
R&AI E PILP 087-ISSUED Remarks:
Duke Energy DOCUMENTTRANSMITTALFORM Date: 12/19/2019 Document Transmittal #: JR-NUC::CN-010114
Purpose:
111H 1--------------------------~ Released By:
Faalrty: CATAWBA NUCLEAR STATION SUBJECT SLC Manual Revision to LOES and 16.8:2 3
4 PILP FYIIE PILP FYIIE PILP 5
FYIIE FYIIE FYilf Page 1 of 1 6
FYIIE FYIIE FYIIE 7
8 FYIIE FYIIE FYIIE FYIIE FYIIE FYIIE FYIIE 9
Duke Energy 4800 Concord Road Document Management CN040M York. SC 29745 CNSDCRM@duke-energy.com 10 11 u
FYIIE FYIIE PILP FYIIE PILP FYIIE FYIJf PILP 13 FYIIE FYIII!
FYIIE 14 FYIIE FYIIE FYIIE
Remove and Insert Replace the following page(s) of Catawba Nuclear Station Selected Licensee Commitments (SLC) Manual with the attached revised page(s). The revised page(s) are identified by Section number and contains marginal lines indicating the areas of change.
REMOVE THESE PAGES INSERT THESE PAGES LIST OF EFFECTIVE SECTIONS Pages 1-5 Revision 86 16.8-2, Pages 1-2 Revision 2 TAB 16.8 Pages 1-5 Revision 87 16.8-2, Pages 1-2 Revision 3 If you have any questions concerning the contents of this Catawba Nuclear Station Selected Licensee Commitments (SLC) Manual update, please contact Nicole Edwards (704) 382-6669.
LIST OF EFFECTIVE SECTIONS SECTION REVISION NUMBER REVISION DATE TABLE OF CONTENTS 15 05/10/16 16.1 1
08/27/08 16.2 2
08/21/09 16.3 1
08/21/09 16.5-1 5
09/03/19 16.5-2 Deleted 16.5-3 2
09/19/19 16.5-4 6
10/09/02 I
16.5-5 1
01/28/10 16.5-6 1
08/21/09 16.5-7 2
02/06/15 16.5-8 Deleted 16.5-9 2
11/06/18 16.5-10 Deleted 16.6-1 0
10/09/02 16.6-2 Deleted 16.6-3 1
08/21/09 16.6-4 2
11/21/19 16.6-5 2
01/09/13 16.7-1 I 1 08/21/09 16.7-2 4
02/03/11 16.7-3 5
11/21/19 16.7-4 2
08/21/09 16.7-5 2
08/21/09
/
Catawba Units 1 and 2 Page 1 Revision 87
LIST OF EFFECTIVE SECTIONS SECTION REVISION NUMBER REVISION DATE 16.7-6 3
06/10/16 16.7-7 1
08/21/09 16.7-8 2
08/21/09 16.7-9 11 07/18/18 16.7-10 8
06/12/19 16.7-11 1
08/21/09 16.7-12 1
08/21/09 16.7-13 3
06/10/16 r
16.7-14 1
08/21/09 16.7-15 1
08/21/09 16.7-16 0
06/08/09 I
16.7-17 0
02/10/15 16.7-18 0
05/10/16 16.8-1 6
12/10/15 16.8-2
~
.1_g G2/ 1.§.2-0/ 1 ~~
16.8-3
,1
/
\\, : _~~j<,
10/24/06 16.8-4 2
11/05/07 16.8-5 3
08/21/09 16.9-1 10 01/29/19 16.9-2 6
08/03/17 16.9-3 5
07/03/18 16.9-4 5
09/11/17 16.9-5 11 10/08/19 16.9-6 12 07/03/18 Catawba Units 1 and 2 Page 2 Revision 87
LIST OF EFFECTIVE SECTIONS SECTION REVISION NUMBER REVISION DATE 16.9-7 4
08/21/09 16.9-8 5
08/21/09 16.9-9 3
08/21/09 16.9-10 5
08/21/09 16.9-11 3
08/21/09 16.9-12 3
02/10/15 16.9-13 4
09/27/16 16.9-14 1
09/25/06 16.9-15 2
08/21/09 16.9-16 2
08/21/09 16.9-17 0
10/09/02 16.9-18 0
10/09/02 16.9-19 3
02/20/12 16.9-20 0
10/09/02 16.9-21 1
10/13/16 16.9-22 1
08/21/09 16.9-23 5
08/03/17 16.9-24 2
10/24/06 16.9-25 2
08/21/09 16.9-26 1
11/15/18 16.10-1 1
08/21/09 16.10-2 1
10/24/06 16.10-3 1
08/21/09 16.11-1 1
07/27/13 Catawba Units 1 and 2 Page 3 Revision 87
LIST OF EFFECTIVE SECTIONS SECTION REVISION NUMBER REVISION DATE 16.11-2 4
02/10/15 16.11-3 0
10/09/02 16.11-4 1
08/21/09 16.11-5 0
10/09/02 16.11-6 3
08/03/15 16.11-7 10 11/29/17 16.11-8 0
10/09/02 16.11-9 0
10/09/02 16.11-10 1
08/21/09 16.11-11 1
03/20/03 16.11-12 0
10/09/02 16.11-13 1
07/27/13 16.11-14 0
10/09/02 16.11-15 0
10/09/02 16.11-16 1
10/24/11 16.11-17 0
10/09/02 16.11-18 1
08/21/09 16.11-19 0
10/09/02 16.11-20 3
11/21/19 16.11-21 0
10/09/02 16.12-1 0
10/09/02 16.13-1 1
08/03/17 16.13-2 Deleted 16.13-3 Deleted Catawba Units 1 and 2 Page 4 Revision 87
SECTION 16.13-4 Catawba Units 1 and 2 LIST OF EFFECTIVE SECTIONS REVISION NUMBER 2
Page 5 REVISION DATE 03/11/18 Revision 87
230 kV Switchyard Systems 16.8-2 16.8 ELECTRICAL POWER SYSTEMS 16.8-2 230 kV Switchyard Systems COMMITMENT APPLICABILITY:
The following switchyard equipment shall be in its normal alignment.
/
- a.
Switchyard Unit 1 PCBs 14, 15, 17, and 18 including their associated manual disconnects, current transformers, interconnecting bus, and support structures (EBA system),
- b.
Switchyard Unit 2 PCBs 20, 21, 23, and 24 including their associated manual disconnects, current transformers, interconnecting bus, and support structures (EBA system),
- c.
Busllnes 1A, 1 B (from main stepup transformers to switchyard unit PCBs), including their associated motor operated disconnects, coupling capacitor voltage transformers, interconnecting bus, and support structures (EBA system),
- d.
Buslines 2A, 28 (from main stepup transformers to switchyard unit PCBs), including their associated motor operated disconnects, coupling capacitor voltage transformers, interconnecting bus, and Sl,!pport structures (EBA system),
- e.
Controls associated with the equipment above (EBE, ERE systems),
- f.
Protective relaying associated with the equipment above (EBO, ERO systems),
- g.
480 VAC auxiliary power load centers STA for both units' Train A, STB for both units' Train B (EBI system), and
- h.
125 VDC auxiliary power (EBH system) per SLC 16.8-3.
At all times in accordance with Technical Specifications (all MODES) and Nuclear System Directive 403 (MODES 4, 5, 6, and No-MODE).
Catawba Units 1 and 2 16.8-2-1 Revision 3
230 kV Switchyard Systems 16 8-2 REMEDIAL ACTIONS A.
CONDITION Switchyard equipment not in normal COMMITMENT alignment.
A.1 REQUIRED ACTION Return switchyard equipment to normal COMMITMENT alignment.
COMPLETION TIME In accordance with the Electronic Risk Assessment Tool TESTING REQUIREMENTS None BASES REFERENCES Effective implementation of the Maintenance Rule, 10 CFR 50.65, requires the continuous assessment of systems determined to be risk significant in the protection against core damage or radiation release. It has been determined through probabilistic risk assessment (PRA) numerical methods that switchyard systems are risk significant from the standpoint of causing or being able to recover from Loss of Offsite Power events. This SLC serves two purposes. It defines the risk significant portions of the switchyard.
It also provides a method of tracking the switchyard systems for the purposes of supporting 1 O CFR 50.65
- 1.
)
10 CFR 50.65, Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants.
- 2.
Deleted.
- 3.
Deleted.
- 4.
CNC-1535.00-00-0008, Severe Accident Analysis Report, CNS PRA Risk Significant SSCs for the Maintenance Rule.
- 5.
CNS-010.01-EB-0001, Switchyard Design Basis Specification.
- 6.
Technical Specification sections 3.8.1 and 3.8.2, LCOs for AC Power Sources during Operating and Shutdown MODES.
- 7.
AD-WC-CNS-0420, "Catawba Nuclear Station Shutdown Risk Management."
Catawba Units 1 and 2 16.8-2-2 Revision 3