ML17038A526
ML17038A526 | |
Person / Time | |
---|---|
Site: | Catawba |
Issue date: | 01/26/2017 |
From: | Duke Energy Corp |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML17038A526 (8) | |
Text
S-0-LJ/3/LJ!~
Distribution: Duke Energy Date: 1l26 [201Z Document Transmittal # : TR-NUC-CN-004567
- 1. Edmond, Russell L
- 2. Ferguson, Jill DOCUMENTTRANSMITTALFORM
Purpose:
~
- 3. Haynes, Larry E Released By:
Facility: CAIAWM ~!.!CLEAR SIAIIQN Dyke Em:rgv
- 4. Henshaw, Michael E SUBJECT 4800 CQn!;~m! RQiU!
- 5. Lowery, Tonya Sullivan SLC Manual Revision to LOES and 16.2-21 Document MilDil9emeot
- 6. OPS TRAINING
- 7. Owens, Lori CN04DM
- 8. Pursley, Sandy I2rk, SC 22145
- 9. U S NUC REG WASHINGTON, DC CNSDCRM@dyke-eoergv.com
- 10. Vu, Phong T
- 11. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 Document ID 1 2 3 4 5 6 7 8 9 10 11 LICN - CN - CNS-SLC-16.9 001 - ISSUED FYIIE FYIIE FYIIE FYIIE FYIIE FYIIE FYIIE FYIIE R&AIE FYIIE R&AIE LICN - CN - CNS-SLC-LOES - 068 - ISSUED FYIIE FYIIE FYIIE FYIIE FYIIE FYIIE FYI IE FYIIE R&AIE FYIIE R&AIE LICN - CN - SLC Letter to Manual Holders - 068 - ISSUED FYIIE FYIIE FYIIE FYIIE FYIIE FYIIE FYIIE FYIIE R&AIE FYIIE R&AIE Remarks:
Remove and Insert Replace the fallowing page(s) of Catawba Nuclear Station Selected Licensee Commitments (SLC) Manual with the attached revised page(s). The revised page(s) are identified by Section number and contains marginal lines indicating the areas of change.
REMOVE THESE PAGES INSERT THESE PAGES LIST OF EFFECTIVE SECTIONS Pages I through 5 Pages I through 5 Revision 67 Revision 68 TAB 16.9
~
..,_J 16.9-21-1 Revision 0 16.9-21-1 Revision I
/
-~ LIST OF EFFECTIVE SECTIONS SECTION REVISION NUMBER REVISION DATE TABLE OF CONTENTS 15 05/10/16 16.1 1 08/27/08 16.2 2 08/21/09 16.3 1 08/21/09 16.5-1 4 09/15/16 16.5-2 Deleted 16.5-3 1 02/20/04 16.5-4 0 10/09/02 16.5-5 1 01/28/10 16.5-6 1 08/21/09 16.5-7 2 02/06/15
~ 16.5-8 2 12/22/08 16.5-9 1 02/20/12 16.5-10 Deleted 16.6-1 0 10/09/02 16.6-2 Deleted 16.6-3 1 08/21/09 16.6-4 1 08/21/09 16.6-5 2 01/09/13 16.7-1 1 08/21/09 16.7-2 4 02/03/11 16.7-3 4 07/27/13 16.7-4 2 08/21/09 16.7-5 2 08/21/09
~J Catawba Units 1 and 2 Page 1 Revision 68
~ LIST OF EFFECTIVE SECTIONS SECTION REVISION NUMBER REVISION DATE 16.7-6 3 06/10/16 16.7-7 1 08/21/09 16.7-8 2 08/21/09 16.7-9 9 06/06/13 16.7-10 7 03/28/16 16.7-11 1 08/21/09 16.7-12 1 08/21/09 16.7-13 3 06/10/16 16.7-14 1 08/21/09 16.7-15 1 08/21/09 16.7-16 0 06/08/09 J .
16.7-17 0 02/10/15 16.7-18 0 05/10/16 16.8-1 6 12/10/15 16.8-2 2 02/20/12 16.8-3 1 10/24/06 16.8-4 2 11/05/07 16.8-5 3 OB/21/09 16.9-1 7 10/24/11 16.9-2 5 10/24/11 16.9-3 3 02/03/11 16.9-4 3 08/21/09 16.9-5 6 06/23/10
.,_J 16.9-6 10 02/10/15 Catawba Units 1 and 2 Page 2 Revision 68
sJ LIST OF EFFECTIVE SECTIONS SECTION REVISION NUMBER REVISION DATE 16.9-7 4 08/21/09 16.9-8 5 08/21/09 16.9-9 3 08/21/09 16.9-10 5 08/21/09 16.9-11 3 08/21/09 16.9-12 3 02/10/15 16.9-13 4 09/27/16 16.9-14 1 09/25/06 16.9-15 2 08/21/09 16.9-16 2 08/21/09 16.9-17 0 10/09/02
~ .
16.9-18 0 10/09/02 16.9-19 3 02/20/12 16.9-20 0 10/09/02 16.9-21 1 10/13/16 16.9-22 1 08/21/09 16.9-23 4 10/24/11 16.9-24 2 10/24/06 16.9-25 2 08/21/09 16.9-26 0 03/05/12 16.10-1 1 08/21/09 16.10-2 1 10/24/06 16.10-3 1 08/21/09 16.11-1 1 07/27/13
~
\
Catawba Units 1 and 2 Page 3 Revision 68
':~ LIST OF EFFECTIVE SECTIONS SECTION REVISION NUMBER REVISION DATE 16.11-2 4 02/10/15 16.11-3 0 10/09/02 16.11-4 1 08/21/09 16.11-5 0 10/09/02 16.11-6 3 08/03/15 16.11-7 9 02/10/15 16.11-8 0 10/09/02 16.11-9 0 10/09/02 16.11-10 1 08/21/09 16.11-11 1 03/20/03 16.11-12 0 10/09/02 I
~
16.11-13 1 07/27/13 16.11-14 0 10/09/02 16.11-15 0 10/09/02 16.11-16 1 10/24/11 16.11-17 0 10/09/02 16.11-18 1 08/21/09 16.11-19 0 10/09/02 16.11-20 2 03/28/16 16.11-21 0 10/09/02 16.12-1 0 10/09/02 16.13-1 0 10/09/02 16.13-2 Deleted 16.13-3 Deleted
'-.:::?
Catawba Units 1 and 2 Page 4 Revision 68
LIST OF EFFECTIVE SECTIONS SECTION REVISION NUMBER REVISION DATE 16.13-4 0 10/09/02 Catawba Units 1 and 2 Page 5 Revision 68
Refueling Operations- Storage Pool Water Level 16.9-21 16.9 AUXILIARY SYSTEMS 16.9-21 Refueling Operations - Storage Pool Water Level COMMITMENT At least 23 feet of water shall be maintained over the top of irradiated fuel assemblies seated in the storage racks.
APPLICABILITY: Whenever irradiated fuel assemblies are in the storage pool.
REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. COMMITMENT not met. A.1 Suspend all movement of Immediately fuel assemblies and crane operations with loads in the fuel storage area.
A.2 Restore water level to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> within limit.
TESTING REQUIREMENTS TEST FREQUENCY TR 16.9-21-1 Verify that the water level in the spent fuel storage pool 7 days is ~ 23 feet over the top of irradiated fuel assemblies seated in the storage racks.
BASES The restrictions on minimum water level ensure that sufficient water depth is available to remove 99.5% of the assumed iodine gap activity released from the rupture of an irradiated fuel assembly. The minimum water depth is consistent with the assumptions of the safety analysis.
REFERENCES 1. Chandu P. Patel, USNRC letter, to G. R. Peterson, Catawba Nuclear Station, Units 1 and 2, RE: Issuance of Amendments (TAC NOS. MB3758 and MB3759) dated April 23, 2002 (ADAMS Accession No. ML021150397)
Catawba Units 1 and 2 16.9-21-1 Revision 1