|
|
(6 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML111730225 | | | number = ML111730225 |
| | issue date = 06/20/2011 | | | issue date = 06/20/2011 |
| | title = San Onofre Nuclear Generating Station, Units 2 & 3 - Response to Regulatory Issue Summary (RIS) 2011-04 | | | title = Response to Regulatory Issue Summary (RIS) 2011-04 |
| | author name = Bauder D R | | | author name = Bauder D |
| | author affiliation = Southern California Edison Co | | | author affiliation = Southern California Edison Co |
| | addressee name = | | | addressee name = |
Line 14: |
Line 14: |
| | page count = 2 | | | page count = 2 |
| }} | | }} |
| See also: [[followed by::RIS 2011-04]]
| |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:SOUTHERNCALIFORNIAEDISON.....AnEDISONINTERNATIONALCompanyATTN:DocumentControlDeskU.S.NuclearRegulatoryCommissionWashington,D.C.20555-0001June20,2011DouglasR.BauderSiteVicePresident&StationManagerSanOnofreNuclearGeneratingStation10CFR55.40Subject:DocketNos.50-361and50-362ResponsetoRegulatoryIssueSummary(RIS)2011-04SanOnofreNuclearGeneratingStation,Units2and3Reference:RIS2011-04,"PreparationandSchedulingofOperatorLicensingExaminations,"datedMay25,2011Gentlemen:ThisletterprovidestheSouthernCaliforniaEdison(SCE)responsetoU.S.NuclearRegulatoryCommissionRegulatoryIssueSummary2011-04,"PreparationandSchedulingofOperatorLicensingExaminations,"datedMay25,2011.ThescheduleshownonNRCForm536,"OperatorLicensingExaminationData,"isenclosedandprovidesSCE'sbestestimatetomeetouroperatorlicensingneedsthroughcalendaryear2016.Ifyouhaveanyquestions,pleasefeelfreetocontactmeorMr.RyanTreadwayat(949)368-9985. | | {{#Wiki_filter:..... |
| | SOUTHERN CALIFORNIA Douglas R. Bauder EDISON Site Vice President & Station Manager San Onofre Nuclear Generating Station An EDISON INTERNATIONAL Company 10 CFR 55.40 June 20, 2011 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 |
|
| |
|
| | ==Subject:== |
| | Docket Nos. 50-361 and 50-362 Response to Regulatory Issue Summary (RIS) 2011-04 San Onofre Nuclear Generating Station, Units 2 and 3 |
| | |
| | ==Reference:== |
| | RIS 2011 -04, "Preparation and Scheduling of Operator Licensing Examinations, " dated May 25, 2011 Gentlemen: |
| | This letter provides the Southern California Edison (SCE) response to U. S. Nuclear Regulatory Commission Regulatory Issue Summary 2011 -04 , "Preparation and Scheduling of Operator Licensing Examinations ," dated May 25 , 2011. |
| | The schedule shown on NRC Form 536 , "Ope rator Licensing Examination Data ," is enclosed and provides SCE 's best estimate to meet our operator licensing needs through calendar year 2016. |
| | If you have any questions, please feel free to contact me or Mr. Ryan Treadway at (949) 368-9985. |
| Sincerely, | | Sincerely, |
|
| |
|
| ===Enclosure:===
| | ==Enclosure:== |
| AsStatedcc:E.E.Collins,RegionalAdministrator,NRCRegionIVMarkS.Haire,Chief,OperationsBranch,NRCRegionIVR.Hall,NRCProjectManager,SanOnofreUnits2and3G.G.Warnkk,NRCSeniorResidentInspector,SanOnofreUnits2and3P.O.Box128SanClemente,CA92672(949)368-9275PAX89275Fax:(949)368-9881Doug.Bauder@sce.com NRCFORM536U.S.NUCLEARREGULATORYCOMMISSIONAPPROVEDBYOMB:NO.3150-0131EXPIRES:10/31/2011(10-2008)Estimatedburdenperresponsetocomplywiththisvoluntaryinformationcollectionrequest:1hour.Thisinformationcollectionisusedtoplanbudgetsandresourcesforoperatorexaminations.SendcommentsregardingburdenOPERATORLICENSINGestimatetotheRecordsandFOIAlPrivacyServicesBranch(T-5F53),U.S.NuclearRegulatoryCommission,Washington,DC20555-0001,orbyinternetEXAMINATIONDATAe-mailtoinfocollects@nrc.gov,andtotheDeskOfficer,OfficeofInformationandRegulatoryAffairs,NEOB-10202,(3150-0131),OfficeofManagementandBudget,Washington,DC20503.IfameansusedtoimposeaninformationcollectiondoesnotdisplayacurrentlyvalidOMBcontrolnumber,theNRCmaynotconductorsponsor,andapersonisnotrequiredtorespondto,theinformationcollection.FACILITYNRCREGIONSanOnofreNuclearGeneratingStation,Units2and3RegionIVA.PROPOSEDEXAMINATIONPREPARATIONSCHEDULEPROPOSEDNUMBERCY2013Cy2014Cy2015Cy2016--------ESTIMATEDNUMBEROF01LICENSEE-PREPARED11EXAMINATIONSESTIMATEDNUMBEROFNRC-PREPARED0000EXAMINATIONSB.INITIALOPERATORLICENSEEXAMINATIONSPROPOSEDNUMBERCY2013Cy2014CY2015CY2016--------NUMBEROFREACTOR10010.10OPERATORSNUMBEROFSENIORREACTOR5055OPERATORS-INSTANTNUMBEROFSENIORREACTOR5055OPERATORS-UPGRADENUMBEROFSENIORREACTOR0000OPERATORS-LIMITEDPROPOSEDDATESPRIMARYDATE10/2112013N/A10/191201510/1712016ALTERNATEDATE11/0412013N/A11/02/201510/3112016C.PROPOSEDGENERICFUNDAMENTALSEXAMINATION(GFE)SCHEDULECY2013CY2014PROPOSED------NUMBERMARCHJUNESEPTEMBERDECEMBERMARCHJUNESEPTEMBERDECEMBERESTIMATEDNUMBEROF2020CANDIDATESNRCFORM536(10-2008)PRINTEDONRECYCLEDPAPER
| | As Stated cc: E. E. Collins, Regional Administrator, NRC Region IV Mark S. Haire , Chief, Operations Branch , NRC Region IV R. Hall, NRC Project Manager, San Onofre Units 2 and 3 G. G. Warnkk, NRC Sen ior Resident Inspector, San Onofre Units 2 and 3 P.O. Box 128 San Clemente, CA 92672 (949) 368-9275 PAX 892 75 Fax: (949) 368-9881 Doug .Bauder@sce.com |
| }} | | |
| | NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISS ION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10 /31 /2011 (10-2008) |
| | Est imate d burden per response to com ply with this voluntary informatio n collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIAlP rivacy Services Branch (T-5 F53), U.S. |
| | OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@ nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may no t co nduc t or spo nsor, and a person is not re quired to re spond to, the information collection. |
| | FACILITY NRC REGION San Onofre Nuclear Generating Station, Units 2 and 3 Region IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 Cy 2014 Cy 2015 Cy 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 1 EXAMINATION S ESTIMATED NUMBER OF NRC-PREPAR ED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 Cy2014 CY 2015 CY 2016 NUMBER OF REACTOR 10 0 10 . 10 OPERATORS NUMBER OF SENIOR REACTOR 5 0 5 5 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 5 0 5 5 OPERATORS -UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATO RS - LIMITED PROPOSED DATES PRIMARY DATE 10/2112013 N/A 10/1912015 10/1712016 ALTERNATE DATE 11/0412013 N/A 11/02/2015 10/3112016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED --- --- |
| | NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 20 20 CANDIDATES NRC FORM 536 (10-2008) PRINTEDONRECYCLED PAPER}} |
|
---|
Category:Letter
MONTHYEARIR 05000361/20240052024-10-0404 October 2024 NRC Inspection Report 05000361/2024005 and 05000362/2024005 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 07200041/20244012024-08-16016 August 2024 San Onofe Nuclear Generating Station, Security Baseline Inspection Report 07200041/2024401 IR 05000361/20240042024-08-0909 August 2024 NRC Inspection Report 05000361/2024004 and 05000362/2024004 ML24191A2472024-07-0202 July 2024 (Songs), Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation - Revision to the ISFSI-Only Emergency Plan and Associated Changes to Emergency Plan Implementing Procedures ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24141A0802024-05-15015 May 2024 (Songs), Units 1, 2 and 3 and Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Operating Report IR 05000361/20240022024-04-0101 April 2024 – NRC Inspection Report 050-00361/2024-002 and 050-00362/2024-002 ML24094A0642024-03-27027 March 2024 Independent Spent Fuel Storage Installation, Decommissioning Funding Status Report 2023 ML24065A0152024-02-28028 February 2024 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation 2023 ML24044A0812024-02-14014 February 2024 LTR-24-0008: NRC Response to Paul Blanch Email Safety of Spent Nuclear Fuel at SONGS ISFSI IR 05000361/20240012024-02-13013 February 2024 NRC Inspection Report 050-00361/2024-001 and 050-00362/2024-001 (1) ML24037A0542024-01-30030 January 2024 (Songs), Units 2 and 3, Submittal of Annual Corporate Financial Reports ML24022A1492024-01-17017 January 2024 Independent Spent Fuel Storage Installation, Revision 4 to the Physical Security Plan ML24017A2432024-01-15015 January 2024 LTR-24-0008 Paul Blanch, E-mails Request for Formal Response to Requests for Meeting to Discuss Safety Issues with NRC Staff IR 05000361/20230062023-11-29029 November 2023 NRC Inspection Report 05000361/2023-006 and 05000362/2023-006 ML23333A0682023-11-22022 November 2023 (SONGS) Units 1, 2, 3 and Independent Spent Fuel Storage Installation - Notification of Change in Nuclear Officer IR 05000361/20230052023-10-11011 October 2023 NRC Inspection Report 05000361/2023005 and 05000362/2023005 ML23276A5942023-09-28028 September 2023 And Independent Spent Fuel Storage Installation - Supplement to Decommissioning Funding Status Reports ML23268A0922023-09-20020 September 2023 Generation Station, Units 1, 2 and 3, and the Independent Spent Fuel Storage Facility (ISFSI) - Re-Registration of Dry Fuel Storage Casks for Amended Certificate of Compliance No. 1040 IR 05000361/20230012023-09-13013 September 2023 NRC Inspection Report 05000361 2023-001 and 05000362 2023-004 ML23240A5372023-08-18018 August 2023 Confirmatory Survey Activities Summary and Results for the Unit 2 and 3 Intake Structures at the San Onofre Nuclear Generating Station San Clemente CA ML23129A1802023-06-14014 June 2023 Cover Letter to State of CA on Draft EA Regarding San Onofre ISFSI Updated DFPs IR 05000361/20230032023-05-31031 May 2023 NRC Inspection Report 05000361/2023003 and 05000362/2023003 IR 05000361/20230022023-05-23023 May 2023 NRC Inspection Report 05000361/2023-002 and 05000362/2023-002 ML23137A1032023-05-11011 May 2023 (Songs), Units 1, 2 and 3, and Independent Spent Fuel Storage Installation - 2022 Annual Radiological Environmental Operating Report ML23123A0932023-04-28028 April 2023 (Songs), Units 1, 2 and 3, Submittal of Annual Radioactive Effluent Release Report - 2022 ML23230A0882023-04-10010 April 2023 Independent Spent Fuel Storage Installation - Decommissioning Quality Assurance Plan ML23094A1272023-03-29029 March 2023 Independent Spent Fuel Storage Installation - 10 CFR 50.82(a)(8)(v and VII) and 10 CFR 72.30(c) Decommissioning Funding Status Report 2021 ML23094A1332023-03-29029 March 2023 Nuclear Property Insurance ML23062A1172023-02-28028 February 2023 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2022 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23059A2812023-02-22022 February 2023 (Songs), Units 1, 2 and 3, 2022 Annual Turtle Incidental Take Report ML23046A3792023-02-22022 February 2023 NRC Inspection Report 050-00361/2023-001 and 050-00362/2023-001 ML23045A2022023-02-0909 February 2023 Submittal of Annual Corporate Financial Reports for San Onofre Nuclear Generating Station (SONGS) Units 2 and 3 for Fy Ending June 30, 2022 ML22287A1352023-01-0505 January 2023 Issuance of Exemption from Title 10 of the Code of Federal Regulations Part 72.106(B), Independent Spent Fuel Storage Installation Controlled Area Boundary (L-2021-LLE-0056) ML22348A0622023-01-0404 January 2023 NRC to SCE, Transmittal of the National Marine Fisheries Services December 12, 2022, Letter of Concurrence for Decommissioning of San Onofre Nuclear Generating Statiion, Units 2 and 3 IR 05000206/20220062022-12-15015 December 2022 NRC Inspection Report 05000206/2022006, 05000361/2022-006, and 05000362/2022-006 ML22347A2122022-12-12012 December 2022 NMFS to NRC, Endangered Species Act Section 7(a)(2) Concurrence Letter for Decommissioning of the San Onofre Nuclear Generating Station ML22340A6652022-12-0505 December 2022 Letter from John Fassell, Chief; Re., State of California Department of Public Health Review and Comments on SONGS Draft Environmental Assessment ML22333A8192022-11-21021 November 2022 Submittal of San Onofre Nuclear Generating Station, Units 2 and 3, Defueled Safety Analysis Report, Revised November 2022 IR 05000361/20220052022-11-17017 November 2022 NRC Inspection Report 05000361/2022-005 and 05000362/2022-005 ML22301A1462022-10-20020 October 2022 Report of Violations of the National Pollutant Discharge Elimination System Permit San Onofre Nuclear Generating Station (Songs), Units 2 and 3 ML22277A0162022-09-29029 September 2022 Independent Spent Fuel Storage Installation Response to Request for Additional Information Regarding Request for Exemption from 10 CFR 72.106(b) IR 05000361/20220042022-09-26026 September 2022 NRC Inspection Report 05000361/2022-004 and 05000362/2022-004 ML22238A0552022-08-29029 August 2022 U.S. Nuclear Regulatory Commission'S Analysis of Southern California Edison'S Decommissioning Funding Status Report for San Onofre Nuclear Generating Station, Units 1, 2, and 3 ML22234A1602022-07-31031 July 2022 Final Report Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 18CLVS431 ML22207B8612022-07-26026 July 2022 NRC (Public) Inspection Report 05000361/2022003; 05000362/2022003 IR 05000361/20220032022-07-26026 July 2022 NRC Inspection Report (Public) 05000361-2022003 and 05000362-2022003 (002) IR 05000361/20220022022-05-12012 May 2022 NRC Inspection Report 05000361/2022-002 and 05000362/2022-002 2024-09-18
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000361/20123012012-12-18018 December 2012 Er 05000361-12-301; 05000362-12-301; October 12 - November 13, 2012; San Onofre Nuclear Generating Station, Units 2 and 3; Initial Operator Licensing Examination Report IR 05000361/20113012012-01-26026 January 2012 Er 05000361-11-301; 05000362-11-301; October 28, 2011; San Onofre Nuclear Generating Station, Units 2 and 3; Initial Operator Licensing Examination Report ML1117302252011-06-20020 June 2011 Response to Regulatory Issue Summary (RIS) 2011-04 IR 05000361/20093022009-12-0808 December 2009 NRC Examination Report 05000361/2009302; 05000362/2009302 IR 05000361/20093012009-03-10010 March 2009 Er 05000361-09-301, 05000362-09-301; on February 3 - 5, 2009; San Onofre Nuclear Generating Station; Initial Operator Licensing Examination Report IR 05000361/20083012008-11-0505 November 2008 Er 05000361-08-301; 05000362-08-301; September 22-29, 2008; San Onofre Nuclear Generating Station, Units 2 and 3; Initial Operator Licensing Examination Report IR 05000361/20073022008-01-18018 January 2008 Er 05000361-07-302; 05000362-07-302; on 12/11-17/2007; San Onofre Nuclear Generating Station; Retake Operator Licensing Examination Report IR 05000361/20063012006-11-21021 November 2006 Er 05000361-2006-301; 05000362-2006-301; 10/23-11/03/2006; San Onofre Nuclear Generating Station, Units 2 and 3; Initial Operator Licensing Examinations IR 05000361/20053022006-01-25025 January 2006 Er 05000361-05-302; 05000362-05-302; 10/24-28/2005; San Onofre Nuclear Generating Station, Units 2 and 3; Initial Operator Licensing Examinations ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination IR 05000361/20033012004-01-29029 January 2004 Er 05000361-03-301; 05000362-03-301; 12/15-19/2003; San Onofre Nuclear Generating Station, Units 2 and 3; Initial Operator Licensing Examinations 2012-12-18
[Table view] |
Text
.....
SOUTHERN CALIFORNIA Douglas R. Bauder EDISON Site Vice President & Station Manager San Onofre Nuclear Generating Station An EDISON INTERNATIONAL Company 10 CFR 55.40 June 20, 2011 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
Subject:
Docket Nos. 50-361 and 50-362 Response to Regulatory Issue Summary (RIS) 2011-04 San Onofre Nuclear Generating Station, Units 2 and 3
Reference:
RIS 2011 -04, "Preparation and Scheduling of Operator Licensing Examinations, " dated May 25, 2011 Gentlemen:
This letter provides the Southern California Edison (SCE) response to U. S. Nuclear Regulatory Commission Regulatory Issue Summary 2011 -04 , "Preparation and Scheduling of Operator Licensing Examinations ," dated May 25 , 2011.
The schedule shown on NRC Form 536 , "Ope rator Licensing Examination Data ," is enclosed and provides SCE 's best estimate to meet our operator licensing needs through calendar year 2016.
If you have any questions, please feel free to contact me or Mr. Ryan Treadway at (949) 368-9985.
Sincerely,
Enclosure:
As Stated cc: E. E. Collins, Regional Administrator, NRC Region IV Mark S. Haire , Chief, Operations Branch , NRC Region IV R. Hall, NRC Project Manager, San Onofre Units 2 and 3 G. G. Warnkk, NRC Sen ior Resident Inspector, San Onofre Units 2 and 3 P.O. Box 128 San Clemente, CA 92672 (949) 368-9275 PAX 892 75 Fax: (949) 368-9881 Doug .Bauder@sce.com
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISS ION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10 /31 /2011 (10-2008)
Est imate d burden per response to com ply with this voluntary informatio n collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIAlP rivacy Services Branch (T-5 F53), U.S.
OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@ nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may no t co nduc t or spo nsor, and a person is not re quired to re spond to, the information collection.
FACILITY NRC REGION San Onofre Nuclear Generating Station, Units 2 and 3 Region IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 Cy 2014 Cy 2015 Cy 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 1 EXAMINATION S ESTIMATED NUMBER OF NRC-PREPAR ED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 Cy2014 CY 2015 CY 2016 NUMBER OF REACTOR 10 0 10 . 10 OPERATORS NUMBER OF SENIOR REACTOR 5 0 5 5 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 5 0 5 5 OPERATORS -UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATO RS - LIMITED PROPOSED DATES PRIMARY DATE 10/2112013 N/A 10/1912015 10/1712016 ALTERNATE DATE 11/0412013 N/A 11/02/2015 10/3112016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED --- ---
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 20 20 CANDIDATES NRC FORM 536 (10-2008) PRINTEDONRECYCLED PAPER