ML111870344: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/06/2011
| issue date = 07/06/2011
| title = Memorandum and Order (Ruling on Pending Motions for Leave to File New and Amended Contentions)
| title = Memorandum and Order (Ruling on Pending Motions for Leave to File New and Amended Contentions)
| author name = Lathrop H K, McDade L G, Wardwell R E
| author name = Lathrop H, Mcdade L, Wardwell R
| author affiliation = NRC/ASLBP
| author affiliation = NRC/ASLBP
| addressee name =  
| addressee name =  
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:
Lawrence G. McDade, Chairman Dr. Kaye D. Lathrop Dr. Richard E. Wardwell In the Matter of ENTERGY NUCLEAR OPERATIONS, INC.
Lawrence G. McDade, Chairman Dr. Kaye D. Lathrop Dr. Richard E. Wardwell In the Matter of                                                       Docket Nos. 50-0247-LR and 50-286-LR ENTERGY NUCLEAR OPERATIONS, INC.                                        ASLBP No. 07-858-03-LR-BD01 (Indian Point Nuclear Generating Units 2 and 3)                        July 6, 2011 MEMORANDUM AND ORDER (Ruling on Pending Motions for Leave to File New and Amended Contentions)
 
TABLE OF CONTENTS INTRODUCTION ...................................................................................................................... I. LEGAL STANDARDS GOVERNING NEW/AMENDED CONTENTION ADMISSIBILITY II. NYS-12C ..........................................................................................................................     A. Background ...............................................................................................................     B. New York Motion .......................................................................................................     C. Entergy Answer .........................................................................................................     D. NRC Staff Answer .....................................................................................................     E. New York Reply.........................................................................................................     F. Board Decision .......................................................................................................... III. NYS-17B ..........................................................................................................................     A. Background ...............................................................................................................     B. New York Motion and Requests Related to Proposed NYS-17B ............................     C. Entergy Answer .......................................................................................................     D. NRC Staff Answer ...................................................................................................     E. New York Reply.......................................................................................................     F. Board Decision ........................................................................................................ IV. AMENDED NYS-25........................................................................................................     A. Background .............................................................................................................     B. New York New Bases for NYS-25 ...........................................................................
(Indian Point Nuclear Generating Units 2 and 3)
ii C. Entergy Answer .......................................................................................................     D. NRC Staff Answer ...................................................................................................     E. New York Reply.......................................................................................................     F. Board Decision ........................................................................................................ V. NYS-37 ..........................................................................................................................     A. Background and New York Motion ..........................................................................     B. Entergy Answer .......................................................................................................     C. NRC Staff Answer ...................................................................................................     D. New York Reply.......................................................................................................     B. Board Decision ........................................................................................................ VI. RK-EC-3/CW-EC-1 ........................................................................................................ VII. CW-RK WASTE CONFIDENCE RULE CONTENTIONS ...............................................     A. Background .............................................................................................................     B. Clearwater and Riverkeeper Joint Motion ...............................................................         1. Timeliness ......................................................................................................         2. Entergy Motion to Strike Portions of Clearwaters and /Riverkeepers Reply .     C. CW-EC-8/RK-EC-6 and CW-SC-2/RK TC-3 Admissibility and Exemption/Waiver Request Denial ........................................................................................................     D. CW-EC-9/RK-EC-7 and CW-SC-3/RK-TC-4 Admissibility ......................................         1. Alleged Gap in the Waste Confidence Decision Update ..............................         2. Specific NEPA-Related Issues of CW-EC-9/RK-EC-7 ...................................     E. Specific Safety-Related Issues of CW-SC-3/RK-TC-4 ............................................     F. Board Decision ........................................................................................................ VIII. AMENDED CW-EC-3 (CW-EC-3A)................................................................................     A. Procedural Background ...........................................................................................     B. Board Decision ........................................................................................................ IX. RK-EC-8 .........................................................................................................................     A. Parties Positions .....................................................................................................     B. Legal Standards Governing the NRC Staff under the ESA and NEPA ...................     C. Chronological Background of the NRC Staffs ESA Review in this Proceeding ......     D. Board Decision ........................................................................................................ X. CONCLUSION ...............................................................................................................
 
Docket Nos. 50-0247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01  
 
July 6, 2011 MEMORANDUM AND ORDER (Ruling on Pending Motions for Leave to File New and Amended Contentions) TABLE OF CONTENTS INTRODUCTION ..................................................................................................................
.... I. LEGAL STANDARDS GOVERNING NEW/AMENDED CONTENTION ADMISSIBILITY II. NYS-12C .......................................................................................................................
... A. Background ............................................................................................................... - 3
- B. New York Motion ....................................................................................................... C. Entergy Answer ......................................................................................................... D. NRC Staff Answer ..................................................................................................... E. New York Reply......................................................................................................... F. Board Decision .......................................................................................................... III. NYS-17B .......................................................................................................................
... A. Background ............................................................................................................... - 9
- B. New York Motion and Requests Related to Proposed NYS-17B ............................ C. Entergy Answer ....................................................................................................... D. NRC Staff Answer ................................................................................................... E. New York Reply....................................................................................................... F. Board Decision ........................................................................................................ IV. AMENDED NYS-25........................................................................................................ A. Background ............................................................................................................. B. New York New Bases for NYS-25 ...........................................................................
ii   C. Entergy Answer ....................................................................................................... D. NRC Staff Answer ................................................................................................... E. New York Reply....................................................................................................... F. Board Decision ........................................................................................................ V. NYS-37 ........................................................................................................................
.. A. Background and New York Motion .......................................................................... B. Entergy Answer ....................................................................................................... C. NRC Staff Answer ................................................................................................... D. New York Reply....................................................................................................... B. Board Decision ........................................................................................................ VI. RK-EC-3/CW-EC-1 ........................................................................................................ VII. CW-RK WASTE CONFIDENCE RULE CONTENTIONS  
............................................... A. Background ............................................................................................................. B. Clearwater and Riverkeeper Joint Motion ............................................................... 1. Timeliness ...................................................................................................... 2. Entergy Motion to Strike Portions of Clearwater's and /Riverkeeper's Reply . C. CW-EC-8/RK-EC-6 and CW-SC-2/RK TC-3 Admissibility and Exemption/Waiver Request Denial ........................................................................................................ D. CW-EC-9/RK-EC-7 and CW-SC-3/RK-TC-4 Admissibility ...................................... 1. Alleged "Gap" in the Waste Confidence Decision Update .............................. 2. Specific NEPA-Related Issues of CW-EC-9/RK-EC-7 ................................... E. Specific Safety-Related Issues of CW-SC-3/RK-TC-4 ............................................ F. Board Decision ........................................................................................................ VIII. AMENDED CW-EC-3 (CW-EC-3A)  
................................................................................ A. Procedural Background ........................................................................................... B. Board Decision ........................................................................................................ IX. RK-EC-8 .......................................................................................................................
.. A. Parties' Positions ..................................................................................................... B. Legal Standards Governing the NRC Staff under the ESA and NEPA ................... C. Chronological Background of the NRC Staff's ESA Review in this Proceeding ...... D. Board Decision ........................................................................................................ X. CONCLUSION ...............................................................................................................- 71
-
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:
Lawrence G. McDade, Chairman Dr. Kaye D. Lathrop Dr. Richard E. Wardwell In the Matter of ENTERGY NUCLEAR OPERATIONS, INC.  
Lawrence G. McDade, Chairman Dr. Kaye D. Lathrop Dr. Richard E. Wardwell In the Matter of                                   Docket Nos. 50-0247-LR and 50-286-LR ENTERGY NUCLEAR OPERATIONS, INC.                    ASLBP No. 07-858-03-LR-BD01 (Indian Point Nuclear Generating Units 2 and 3)    July 6, 2011 MEMORANDUM AND ORDER (Ruling on Pending Motions for Leave to File New and Amended Contentions)
INTRODUCTION Before the Board are several motions for leave to file new or amended contentions in response to Amendment 9 to Applicant, Entergy Nuclear Operations, Inc.s (Entergy) License Renewal Application (LRA)1 and the NRC Staffs Final Supplemental Environmental Impact Statement (FSEIS).2 Some of these motions entail waiver petitions, exemption requests, and/or motions to strike. We first address the standards for contention admissibility and then separately discuss each proposed contention and its associated motions.
1 See Letter from Fred Dacimo, Vice President, License Renewal, Entergy Nuclear Northeast, to U.S. Nuclear Regulatory Commission, NL-10-063, Attach. 1, Amendment 9 to License Renewal Application - Reactor Vessel Internals Program (July 14, 2010) (ADAMS Accession No. ML102010102) [hereinafter LRA amend. 9]; see also Letter from Kathryn M. Sutton and Paul M. Bessette, Counsel for Entergy Nuclear Operations, Inc., to Atomic Safety and Licensing Board (July 15, 2010).
2 The NRC Staff issued the FSEIS on December 3, 2010. See Letter from Sherwin E. Turk, Counsel for NRC Staff, to Atomic Safety and Licensing Board (Dec. 3, 2010); Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437, Supplement 38, Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Final Report, NUREG-1437 (Dec. 2010)
[hereinafter FSEIS].


(Indian Point Nuclear Generating Units 2 and 3)  
I.      LEGAL STANDARDS GOVERNING NEW/AMENDED CONTENTION ADMISSIBILITY Consistent with the provisions in 10 C.F.R. § 2.309(f)(2), a timely new or amended contention must be based on information that previously was unavailable, arise from information that is materially different from previous information, and be filed in a timely fashion.3 Our July 1, 2010 Scheduling Order generally provided for a thirty-day window within which to file new or amended contentions based on new information.4 The opening of this window is the date that the materially different new information becomes reasonably available to the participants in this proceeding.5 If a new or amended contention is not timely filed, its proponent must meet the eight-factor balancing test of 10 C.F.R. § 2.309(c)(1). Of the eight factors identified in Section 2.309(c)(1), the Commission has deemed the good cause factor the most important.6 In addition to Section 2.309(f)(2) or (c)(1)s standards, a new or amended contention must also satisfy the general contention admissibility requirements of 10 C.F.R. § 2.309(f)(1).7 In our July 1, 2010 Scheduling Order, we stated that if a party moving for admission of a new or amended contention is uncertain whether Section 2.309(c)(1) (for nontimely filed contentions) or Section 2.309(f)(2) (for timely filed contentions) applies, it may file pursuant to both sections.8 3
Id. § 2.309(f)(2)(i)-(iii).
4 Licensing Board Scheduling Order (July 1, 2010) at para. F.2 (unpublished) [hereinafter July 1, 2010 Scheduling Order].
5 Cf. Northern States Power Co. (Prairie Island Nuclear Generating Plant, Units 1 and 2), CLI-10-27, 72 NRC __, __-__ (slip op. at 17-18) (Sept. 30, 2010).
6 AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-09-07, 69 NRC 235, 261 (2009).
7 See id.; Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station, Unit 3), CLI 05, 69 NRC 115, 120 n.21 (2009).
8 See July 1, 2010 Scheduling Order at para. F.2.


Docket Nos. 50-0247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01
NRC regulations dictate that contentions arising pursuant to the National Environmental Policy Act (NEPA) must initially be based on the applicants environmental report [ER].9 If admitted, those contentions may be amended, or new contentions proffered, as long as there are data or conclusions in the NRC draft or final environmental impact statement . . . or any supplements relating thereto, that differ significantly from the data or conclusions in the applicants documents.10 In our December 27, 2010 Order, we stated that new or amended contentions that are properly based on significantly new data or conclusions in the FSEIS will be considered timely if filed on or before February 3, 2011.11 II.        NYS-12C A. Background Before addressing the admissibility of the State of New Yorks (New Yorks) Contention 12-C (NYS-12C), the history of earlier iterations of this contention is summarized as follows.
We first admitted NYS-12, which contested the accuracy of Entergys severe accident mitigation alternatives (SAMA) analysiss estimation of decontamination and clean up costs in the New York City metropolitan area from a severe nuclear accident at the Indian Point Energy Center (IPEC). More specifically, NYS-12 alleged that the ERs use of the MACCS2 computer code effectively underestimated the cost of a severe accident.12 We then admitted NYS-12A, which raised a comparable dispute with the adequacy of the NRC Staffs Draft Supplemental 9
10 C.F.R. § 2.309(f)(2).
10 Id. (emphasis added).
11 Licensing Board Order (Granting Intervenors Unopposed Joint Motion for an Extension of Time) (Dec. 27, 2010) at 2 (unpublished). Because the FSEIS was issued on December 3, 2010, new or amended contentions would have been due by January 3, 2011 without the extension we granted. See id. at 1.
12 LBP-08-13, 68 NRC 43, 100-02 (2008).


July 6, 2011 MEMORANDUM AND ORDER (Ruling on Pending Motions for Leave to File New and Amended Contentions)
Environmental Impact Statement (DSEIS) on this topic.13 Subsequently, we admitted NYS-12B, which raised a similar challenge to Entergys December 2009 SAMA Reanalysis.14 B.      New York Motion NYS-12C, filed on February 3, 2011,15 purports to update New Yorks earlier claims against Entergys ER and the NRC Staffs DSEIS by applying them to the FSEIS.16 Specifically, New York faults the FSEISs reliance on the MACCS2 code because of that models assumption that a severe accident would entail the release of large-sized (rather than small-sized) radionuclide particles, which results in an underestimation of the cleanup costs of a severe nuclear accident in the region around Indian Point.17 New York states that the FSEIS incorrectly fails to scale up the [1996 Sandia Study] decontamination cost data for a high density urban 13 Licensing Board Order (Ruling on New York States New and Amended Contentions) (June 16, 2009) at 3-4 (unpublished) [hereinafter June 16, 2009 Licensing Board Order].
INTRODUCTION Before the Board are several motions for leave to file new or amended contentions in response to Amendment 9 to Applicant, Entergy Nuclear Operations, Inc.'s (Entergy) License Renewal Application (LRA) 1 and the NRC Staff's Final Supplemental Environmental Impact Statement (FSEIS).
14 LBP-10-13, 71 NRC __, __ (slip op. at 9-10) (June 30, 2010).
2 Some of these motions entail waiver petitions, exemption requests, and/or motions to strike. We first address the standards for contention admissibility and then separately discuss each proposed contention and its associated motions.  
15 State of New Yorks Motion for Leave to File New and Amended Contention-12C Concerning NRC Staffs December 2010 Final Supplemental Environmental Impact Statement and the Underestimation of Decontamination and Clean Up Costs Associated with a Severe Accident in the New York Metropolitan Area (Feb. 3, 2011) [hereinafter New York Motion for Leave to File NYS-12C]; State of New York New Contention-12C Concerning NRC Staffs December 2010 Final Environmental Impact Statement and the Underestimation of Decontamination and Clean Up Costs Associated with a Severe Accident in the New York Metropolitan Area (Feb. 3, 2011)
[hereinafter NYS-12C]. On March 7, 2011, Entergy and the NRC Staff each filed Answers opposing in part admission of NYS-12C. Applicants Answer to New York States Amended Contention 12C Concerning Severe Accident Mitigation Alternatives Analysis (Mar. 7, 2011)
[hereinafter Entergy Answer to NYS-12C]; NRC Staffs Answer to State of New York Contention 12-C Concerning the Final SEIS Evaluation of Decontamination and Clean Up Costs in a Severe Accident (Mar. 7, 2011) [hereinafter NRC Staff Answer to NYS-12C]. On March 18, 2011, New York filed its Combined Reply to Entergys and the NRC Staffs Answers. State of New Yorks Combined Reply to NRC Staff and Entergys Answers to Contention 12-C Concerning NRC Staffs December 2010 Final Environmental Impact Statement and the Underestimation of Decontamination and Clean Up Costs Associated with a Severe Reactor Accident in the New York Metropolitan Area (Mar. 18, 2011) [hereinafter New York NYS-12C Reply].
16 NYS-12C at 2-3.
17 Id. at 4-7.


1  See Letter from Fred Dacimo, Vice President, License Renewal, Entergy Nuclear Northeast, to U.S. Nuclear Regulatory Commission, NL-10-063, Attach. 1, Amendment 9 to License Renewal Application - Reactor Vessel Internals Program (July 14, 2010) (ADAMS Accession No. ML102010102) [hereinafter LRA amend. 9]; see also Letter from Kathryn M. Sutton and Paul M. Bessette, Counsel for Entergy Nuclear Operations, Inc., to Atomic Safety and Licensing Board (July 15, 2010).  
area such as New York City and its metropolitan area.18 In support of this claim, New York relies on information supplied in NYS-12/12A/12B as well as a report dated February 2011 and signed by its proffered expert, David Chanin, who incorporates other reports into his position regarding the FSEIS that the NRC Staff needs to take account property values around Indian Point and to express those values in present and future values.19 New York adds challenges to the FSEISs discussions of severe accidents to its claims against Entergys ER and the NRC Staffs DSEIS, concluding that the FSEISs underestimation of cleanup costs violates the NRC Staffs duties under NEPA, the Administrative Procedure Act (APA), and NRC and Council on Environmental Quality (CEQ) regulations.20 Entergy and the NRC Staff do not oppose the admission of NYS-12C insofar as it seeks to apply NYS-12/12A/12C to the FSEIS; Entergy limits its tolerance of the contention to its reliance on supporting evidence identified by New York in earlier versions of the contention.21 Other than that, both parties oppose admission of the contention.
C.     Entergy Answer Entergy portrays Mr. Chanins report (and the reports it relies on) as too attenuated to the SAMA analysis conducted for Indian Point and thus insufficient to support New Yorks arguments in NYS-12C.22 Moreover, Entergy maintains that New York has not raised a genuine dispute of material fact with the FSEIS because (1) the radionuclides postulated in the FSEIS are indeed small, and radionuclides similar to those used in the Indian Point SAMA analysis in the FSEIS have been found acceptable for SAMA analyses at other facilities in the past, (2) Mr.
Chanins position does not materially contradict conclusions made in the FSEIS regarding 18 Id. at 7.
19 Id. at 7-15.
20 Id. at 1.
21 Entergy Answer to NYS-12C at 16-17; NRC Staff Answer to NYS-12C at 8.
22 Entergy Answer to NYS-12C at 17-22.


2  The NRC Staff issued the FSEIS on December 3, 2010. See Letter from Sherwin E. Turk, Counsel for NRC Staff, to Atomic Safety and Licensing Board (Dec. 3, 2010); Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437, Supplement 38, Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Final Report, NUREG-1437 (Dec. 2010) [hereinafter FSEIS].      I. LEGAL STANDARDS GOVERNING NEW/AMENDED CONTENTION ADMISSIBILITY Consistent with the provisions in 10 C.F.R. § 2.309(f)(2), a timely new or amended contention must be based on information that previously was unavailable, arise from information that is materially different from previous information, and be filed in a timely fashion.
clean-up costs from plutonium and cesium dispersal, (3) there is no technical reason to require a higher population density multiplier per-square-kilometer than that used in the FSEIS, (4) the FSEIS did include an analysis of severe accidents impacts on local property values using site-specific data, and (5) New Yorks demands would transform the SAMA analysis into a worst-case analysis, something that Entergy argues is beyond the requirements for license renewal in NRC regulations.23 D.     NRC Staff Answer The NRC Staff attacks the timeliness of elements of NYS-12C, positing that New York could have raised challenges to compliance with the APA and NRC and CEQ regulations earlier and that positions found in Mr. Chanins report citing other documents could have been raised earlier.24 Moreover, the NRC Staff describes the agencys compliance with CEQ regulations as immaterial to its licensing decision in this proceeding.25 On a larger scale, the NRC Staff describes much of New Yorks claims as vague and represents that the sufficiency of its review of Entergys SAMA Analysis is subject to challenge in this proceeding, rather than the adequacy of its review contained in the FSEIS.26 E.     New York Reply New York replies that NYS-12C was timely filed because its references to CEQ regulations and the APA are not new, given that it has previously raised objections citing such authority regarding similar issues.27 Similarly, New York responds that Mr. Chanins report and 23 Id. at 22-25.
3  Our July 1, 2010 Scheduling Order generally provided for a thirty-day window within which to file new or amended contentions based on new information.
24 NRC Staff Answer to NYS-12C at 10-25. Entergy also states that positions in Mr. Chanins report could have been filed earlier and are thus impermissible support for New York, but does not object to the timeliness of NYS-12Cs challenge to Section G of the FSEIS. See Entergy Answer to NYS-12C at 17 n.90.
The opening of this window is the date that the materially different new information becomes reasonably available to the participants in this proceeding.
25 NRC Staff Answer to NYS-12C at 10, 12 & n.25, 19-20, 23-24.
5  If a new or amended contention is not timely filed, its proponent must meet the eight-factor balancing test of 10 C.F.R. § 2.309(c)(1). Of the eight factors identified in Section 2.309(c)(1), the Commission has deemed the "good cause" factor the most important.
26 See id. at 14, 17-20, 22.
6  In addition to Section 2.309(f)(2) or (c)(1)'s standards, a new or amended contention must also satisfy the general contention admissibility requirements of 10 C.F.R. § 2.309(f)(1).
27 New York NYS-12C Reply at 5-6.
7 In our July 1, 2010 Scheduling Order, we stated that if a party moving for admission of a new or amended contention is uncertain whether Section 2.309(c)(1) (for nontimely filed contentions) or Section 2.309(f)(2) (for timely filed contentions) applies, it may file pursuant to both sections.
8 3  Id. § 2.309(f)(2)(i)-(iii).
4  Licensing Board Scheduling Order (July 1, 2010) at para. F.2 (unpublished) [hereinafter July 1, 2010 Scheduling Order].
5  Cf. Northern States Power Co. (Prairie Island Nuclear Generating Plant, Units 1 and 2), CLI-10-27, 72 NRC __, __-__ (slip op. at 17-18) (Sept. 30, 2010).  


AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-09-07, 69 NRC 235, 261 (2009).  
the documents cited therein were timely filed because NYS-12C was triggered by the FSEISs response to NYS-12/12A/12B rather than these documents that support the proposed amended contention.28 New York also objects to the NRC Staffs supposition that contentions may not be filed against licensing documents issued by the NRC Staff.29 Further, New York represents that it has provided enough information to support its claims and has not sought to impose a more restrictive worst-case SAMA analysis on the review of Entergys LRA for Indian Point Units 2 and 3 (IP2 and IP3) than NRC regulations require.30 F.      Board Decision The NRC Staff is mistaken that its environmental review is immune from challenge in adjudicatory proceedings. It is true that the NRC Staffs safety review is not directly subject to challenge, because it is the sufficiency of the license application that is subject to litigation, not the sufficiency of the NRC Staffs review of that application.31 Nevertheless, the structure of 10 C.F.R. § 2.309(f)(2) permits new or amended contentions to be filed against multiple forms and stages of the NRC Staffs environmental review and, accordingly, such claims are within the scope of this proceeding pursuant to Section 2.309(f)(1)(iii). Moreover, as we have stated above, Section 2.309(f)(2) allows contentions originally filed against an applicants ER to be amended if there are data and conclusions in NRC Staff environmental documents that differ significantly from the data or conclusions in the applicants documents.32 NYS-12Cs claims regarding the sufficiency of Entergys and the NRC Staffs SAMA reviews mirror the basic allegation found in the consolidated contention that NYS-12C seeks to amend - namely, that 28 Id. at 8.
29 Id. at 7-11.
30 Id. 13-17.
31 See AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-08-23, 68 NRC 461, 482 (2008).
32 10 C.F.R. § 2.309(f)(2).


See id.; Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station, Unit 3), CLI-09-05, 69 NRC 115, 120 n.21 (2009).  
Entergys and the NRC Staffs use of the MACCS2 code leads to an underestimation of the cleanup costs from a severe accident.33 That overarching aspect of this contention, including its citation to the 1996 Sandia National Laboratories Report, has not differed significantly in NYS-12C and is within the scope of the already consolidated NYS-12/12A/12B.
New Yorks citations to the APA, NRC regulations, and CEQ regulations are neither untimely nor improper at this juncture. As we have previously noted, the NRC Staff is bound to follow the APA and NRC regulations in carrying out its duties under NEPA.34 Moreover, the NRC gives deference to CEQ regulations to the extent that they do not have a substantive impact on the way in which the Commission performs its regulatory functions.35 Similarly, the fact that New York brings factual and expert support that might be years old to support its claims does not render the contention buttressed by that support either untimely or inadmissible. As we read it, NYS-12C arises from the NRC Staffs FSEIS, which explicitly attempts to resolve concerns raised in NYS-12/12A/12B.36 The expert analyses brought in NYS-12C are not the underlying basis giving rise to the contention but are tools used by New York to attempt to refute the validity of the NRC Staffs analysis. The basis of the contention pursuant to Section 2.309(f)(1)(ii) is that the NRC Staffs analysis in the FSEIS underestimates severe accident cleanup costs due to use of the MACCS2 code. Therefore, the contention is based on new information, the FSEIS, and is not late filed.
Also, the fact that Mr. Chanin has asserted a plausible link between the documents he cites and the NRC Staffs SAMA analysis that uses the MACCS2 code constitutes adequate expression of an expert opinion pursuant to Section 2.309(f)(1)(v) and raises a genuine dispute 33 See LBP-08-13, 68 NRC at 100-02.
34 See LBP-10-13, 71 NRC at __ (slip op. at 28).
35 Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), CLI-91-02, 33 NRC 61, 72 n.3 (1991) (citations omitted).
36 See FSEIS at G-22 to G-24.


8  See July 1, 2010 Scheduling Order at para. F.2.
pursuant to Section 2.309(f)(1)(vi) as to the sufficiency of the NRC Staffs SAMA analysis as articulated in the FSEIS. The extent to which Mr. Chanins opinion is correct is a merits question that we leave for the evidentiary hearing in this proceeding. Accordingly, we find that NYS-12C is admissible and consolidate it with NYS-12/12A/12B as Consolidated NYS-12C.
NRC regulations dictate that contentions arising pursuant to the National Environmental Policy Act (NEPA) must initially be "based on the applicant's environmental report [ER]."
III.     NYS-17B A.       Background In granting New Yorks hearing request in this proceeding, we admitted NYS-17, which alleged that Entergys ER fails to include an analysis of adverse impacts on off-site land use of license renewal and thus erroneously concludes that relicensing of IP2 and IP3 will have a significant positive impact on the communities surrounding the station (ER Section 8.5) and understates the adverse impact on off-site land use (ER Sections 4.18.4 and 4.18.5) in violation of 10 C.F.R. Part 51, Subpart A, Appendix B.37 Our ruling stated in pertinent part:
9  If admitted, those contentions may be amended, or new contentions proffered, as long as "there are data or conclusions in the NRC draft or final environmental impact st atement . . . or any supplements relating thereto, that differ significantly from the data or conclusions in the applicant's documents."
In conducting its analysis of the impact of the license renewal on land use, Entergy should have considered the impact on real estate values that would be caused by license renewal or nonrenewal. NRC Regulations do not limit consideration to tax-driven land-use changes. Table B-1 merely notes that significant changes in land use may be associated with population and tax-revenue changes resulting from license renewal. It does not limit consideration to tax-driven land-use changes. Accordingly, we admit NYS-17 as a contention of omission.38 On February 27, 2009, New York submitted amended contention NYS-17A, which was based on the NRC Staffs DSEIS, alleging that:
10  In our December 27, 2010 Order, we stated that "new or amended contentions that are properly based on significantly new data or conclusions in the FSEIS will be considered timely if filed on or before February 3, 2011."
The [DSEIS] fails to address the impact of the continued operation of IP2 and IP3 for another 20 years on off-site land use, including real estate values in the surrounding area in violation of 10 C.F.R. §§ 51.71(a), 51.71(d), 51.95(c)(1), and 51.95(c)(4).39 37 LBP-08-13, 68 NRC at 113.
11 II. NYS-12C A. Background Before addressing the admissibility of the State of New York's (New York's) Contention 12-C (NYS-12C), the history of earlier iterations of this contention is summarized as follows. We first admitted NYS-12, which contested the accuracy of Entergy's severe accident mitigation alternatives (SAMA) analysis's estimation of decontamination and clean up costs in the New York City metropolitan area from a severe nuclear accident at the Indian Point Energy Center (IPEC). More specifically, NYS-12 alleged that the ER's use of the MACCS2 computer code effectively underestimated the cost of a severe accident.
38 Id. at 116.
12  We then admitted NYS-12A, which raised a comparable dispute with the adequacy of the NRC Staff's Draft Supplemental 9  10 C.F.R. § 2.309(f)(2).
39 June 16, 2009 Licensing Board Order at 7.
10  Id. (emphasis added).
11  Licensing Board Order (Granting Intervenor's Unopposed Joint Motion for an Extension of Time) (Dec. 27, 2010) at 2 (unpublished). Because the FSEIS was issued on December 3, 2010, new or amended contentions would have been due by January 3, 2011 without the extension we granted. See id. at 1. 12  LBP-08-13, 68 NRC 43, 100-02 (2008).
Environmental Impact Statement (DSEIS) on this topic.
13  Subsequently, we admitted NYS-12B, which raised a similar challenge to Entergy's December 2009 SAMA Reanalysis.
14 B. New York Motion NYS-12C, filed on February 3, 2011, 15 purports to update New York's earlier claims against Entergy's ER and the NRC Staff's DSEIS by applying them to the FSEIS.
16  Specifically, New York faults the FSEIS's reliance on the MACCS2 code because of that model's assumption that a severe accident would entail the release of large-sized (rather than small-sized) radionuclide particles, which results in an underestimation of the cleanup costs of a severe nuclear accident in the region around Indian Point.
17  New York states that the FSEIS incorrectly "fails to scale up the [1996 Sandia Study] decontamination cost data for a high density urban 13  Licensing Board Order (Ruling on New York State's New and Amended Contentions) (June 16, 2009) at 3-4 (unpublished) [hereinafter June 16, 2009 Licensing Board Order].
14  LBP-10-13, 71 NRC __, __ (slip op. at 9-10) (June 30, 2010).
15  State of New York's Motion for Leave to File New and Amended Contention-12C Concerning NRC Staff's December 2010 Final Supplemental Environmental Impact Statement and the Underestimation of Decontamination and Clean Up Costs Associated with a Severe Accident in the New York Metropolitan Area (Feb. 3, 2011) [hereinafter New York Motion for Leave to File NYS-12C]; State of New York New Contention-12C Concerning NRC Staff's December 2010 Final Environmental Impact Statement and the Underestimation of Decontamination and Clean Up Costs Associated with a Severe Accident in the New York Metropolitan Area (Feb. 3, 2011) [hereinafter NYS-12C]. On March 7, 2011, Entergy and the NRC Staff each filed Answers opposing in part admission of NYS-12C. Applicant's Answer to New York State's Amended


Contention 12C Concerning Severe Accident Mitigation Alternatives Analysis (Mar. 7, 2011) [hereinafter Entergy Answer to NYS-12C]; NRC Staff's Answer to State of New York Contention 12-C Concerning the Final SEIS Evaluation of Decontamination and Clean Up Costs in a Severe Accident (Mar. 7, 2011) [hereinafter NRC Staff Answer to NYS-12C]. On March 18, 2011, New York filed its Combined Reply to Entergy's and the NRC Staff's Answers. State of
We admitted NYS-17A and consolidated it with NYS-17, ruling that this amended contention update[d] the original to reflect that New York contends that the NRC Staff erred in a similar manner to Entergy and that the original contention was now relevant to the Draft SEIS, as well as to the ER.40 On April 22, 2010, we denied a Motion for Summary Disposition of NYS-17/17A filed by Entergy, ruling that NYS-17/17A was within the scope of this proceeding and that there remain[ed] a genuine dispute over a material fact regarding the socioeconomic environmental impacts of license renewal on property values adjacent to [Indian Point].41 However, in so ruling, the Board included the following caveat:
We agree with Entergy that proffered NEPA contentions relating to on-site spent fuel storage are outside the scope of this proceeding due to the Waste Confidence Rule (codified as 10 C.F.R. § 51.23), whose continuing viability we recently certified to the Commission.42 B.      New York Motion and Requests Related to Proposed NYS-17B On January 24, 2011, New York filed (1) a Motion for Leave to File Timely Amended Bases to Contention 17A (Now to be Designated Contention 17B)43; (2) a Request that the proposed amended bases for NYS-17A be deemed not barred by 10 C.F.R. § 51.23(b), that we exempt New York from the requirements of Section 51.23(b), or that we certify the waiver of 10 40 Id. at 8.
41 Licensing Board Memorandum and Order (Denying Entergys Motion for the Summary Disposition of NYS Contention 17/17A) (Apr. 22, 2010) at 11-17 (unpublished) [hereinafter Apr.
22, 2010 Licensing Board Memorandum and Order].
42 Id. at 13-14.
43 State of New York Motion for Leave to File Timely Amended Bases to Contention 17A (Now to be Designated Contention 17B) (Jan. 24, 2011) [hereinafter New York Motion for Leave to File NYS-17B].


New York's Combined Reply to NRC Staff and Entergy's Answers to Contention 12-C Concerning NRC Staff's December 2010 Final Environmental Impact Statement and the Underestimation of Decontamination and Clean Up Costs Associated with a Severe Reactor Accident in the New York Metropolitan Area (Mar. 18, 2011) [hereinafter New York NYS-12C Reply].
C.F.R. § 51.23(b);44 and (3) a proposed Contention 17B (NYS-17B) containing the amended bases.45 Proposed NYS-17B reads:
16  NYS-12C at 2-3.
The FSEIS fails to address the impact of the continued operation of IP2 and IP3 for another 20 years on offsite land use, including real estate values in the surrounding area in violation of 10 C.F.R. §§ 51.71(a), 51.71(d), 51.95(c)(1), and 51.95(c)(4).46 Using the update to the Waste Confidence Rule promulgated by the NRC on December 23, 2010, as its starting point, New York asserts that there is no longer a date certain by which spent fuel will be removed from the Indian Point site, and that there is every reason to believe that spent fuel will remain at the Indian Point site for an indefinite period following plant shutdown after license renewal.47 Accordingly, New York argues that granting Entergys LRA for IP2 and IP3 will perpetuate depressed land values and reduced tax revenues.48 Moreover, because in its view the FSEIS did not cure the alleged omissions in Entergys ER and the DSEIS by analyzing the impacts to off-site property values and tax revenues from long-term storage of spent fuel, New York argues that the FSEIS does not sufficiently address this issue.49 44 State of New Yorks Request for a Determination that the Proposed Amended Bases for Contention 17A are not Barred by 10 C.F.R. § 51.23(b), or that Exemption from the Requirements of 10 C.F.R. § 51.23(b) Should be Granted, or that the State has Made a Prima Facie Case that § 51.23(b) Should be Waived as Applied to Contention 17B (Jan. 24, 2011)
17  Id. at 4-7.       area such as New York City and its metropolitan area."
[hereinafter New York Alternative Requests Re: NYS-17B].
18 In support of this claim, New York relies on information supplied in NYS-12/12A/12B as well as a report dated February 2011 and signed by its proffered expert, David Chanin, who incorporates other reports into his position regarding the FSEIS that the NRC Staff needs to take account property values around Indian Point and to express those values in present and future values.
45 State of New York Contention 17B (Jan. 24, 2011) [hereinafter NYS-17B].
19  New York adds challenges to the FSEIS's discussions of severe accidents to its claims against Entergy's ER and the NRC
46 Id. at 2. Entergy and the NRC Staff filed Answers to New Yorks filings associated with NYS-17B on February 18, 2011. Applicants Answer to Proposed Amended Contention New York State 17B and the Associated Request for Exemption and/or Waiver of 10 C.F.R. § 51.23(b)
(Feb. 18, 2011) [hereinafter Entergy Answer to NYS-17B]; NRC Staffs Answer to the State of New Yorks Motion for Leave to File Amended Bases to Contention 17A (To be Designated 17B) and Request for an Exemption or Waiver (Feb. 18, 2011) [hereinafter NRC Staff Answer to NYS-17B]. New York filed its Reply on March 4, 2011. State of New Yorks Combined Reply to the Answers of Entergy and NRC Staff to the States Proposed Amended Contention NYS-17B (Mar. 4, 2011) [hereinafter New York NYS-17B Reply].
47 New York Motion for Leave to File NYS-17B at 1-2.
48 Id. at 6.


Staff's DSEIS, concluding that the FSEIS's underestimation of cleanup costs violates the NRC Staff's duties under NEPA, the Administrative Procedure Act (APA), and NRC and Council on Environmental Quality (CEQ) regulations.
New York maintains that this contention is based on new and materially different information because of the new Waste Confidence Rules shift from a date certain that spent fuel would be removed from the site to an open-ended timeline.50 Further, New York represents that this amended contention is timely because it was filed within thirty days of the new Waste Confidence Rules promulgation.51 Together with its Motion to add the new bases of NYS-17B to NYS-17/17A, New York provides an alternative pleading that argues claims arising from the long-term on-site storage of spent fuel are not barred by the updated Waste Confidence Rule but, if we were to rule contrary to that position, New York asks the Board to either exempt New York from that Rule or to certify a request for waiver of that Rule to the Commission.52 C. Entergy Answer Entergy opposes admission of NYS-17B and New Yorks proposed alternative remedies of exemption or waiver. Entergy maintains that NYS-17B and its associated waiver petition are untimely because the possibility of long-term storage of spent fuel at the Indian Point site was publicly known and acknowledged by New York for at least one year before New York submitted its pleadings related to NYS-17B.53 Regardless of timeliness, Entergy asserts that this contention is not admissible because the Waste Confidence Rule has generically resolved the challenges that are at the heart of NYS-17B, which relate to the long-term on-site storage of spent fuel at Indian Point for up to sixty years after cessation of operations, and is also inadmissible because the Commission is 49 Id. at 4-5.
20  Entergy and the NRC Staff do not oppose the admission of NYS-12C insofar as it seeks to apply NYS-12/12A/12C to the FSEIS; Entergy limits its tolerance of the contention to its reliance on "supporting evidence" identified by New York in earlier versions of the contention.
50 Id. at 1-4.
21  Other than that, both parties oppose admission of the contention. C. Entergy Answer Entergy portrays Mr. Chanin's report (and the reports it relies on) as too attenuated to the SAMA analysis conducted for Indian Point and thus insufficient to support New York's arguments in NYS-12C.
51 Id. at 3.
22  Moreover, Entergy maintains that New York has not raised a genuine dispute of material fact with the FSEIS because (1) the radionuclides postulated in the FSEIS are indeed small, and radionuclides similar to those used in the Indian Point SAMA analysis in the FSEIS have been found acceptable for SAMA analyses at other facilities in the past, (2) Mr.
52 New York Alternative Requests Re: NYS-17B at 2--11, 13-20.
Chanin's position does not materially contradict conclusions made in the FSEIS regarding 18  Id. at 7. 19  Id. at 7-15.
53 Entergy Answer to NYS-17B at 15-19.
20  Id. at 1. 21  Entergy Answer to NYS-12C at 16-17; NRC Staff Answer to NYS-12C at 8.
22  Entergy Answer to NYS-12C at 17-22.      clean-up costs from plutonium and cesium dispersal, (3) there is no technical reason to require a higher population density multiplier per-square-kilometer than that used in the FSEIS, (4) the FSEIS did include an analysis of severe accidents' impacts on local property values using site-specific data, and (5) New York's demands would transform the SAMA analysis into a worst-case analysis, something that Entergy argues is beyond the requirements for license renewal in NRC regulations.
23  D. NRC Staff Answer The NRC Staff attacks the timeliness of elements of NYS-12C, positing that New York could have raised challenges to compliance with the APA and NRC and CEQ regulations earlier and that positions found in Mr. Chanin's report citing other documents could have been raised earlier.24  Moreover, the NRC Staff describes the agency's compliance with CEQ regulations as immaterial to its licensing decision in this proceeding.
25  On a larger scale, the NRC Staff describes much of New York's claims as vague and represents that the sufficiency of its review of Entergy's SAMA Analysis is subject to challenge in this proceeding, rather than the adequacy of its review contained in the FSEIS.
26  E. New York Reply New York replies that NYS-12C was timely filed because its references to CEQ regulations and the APA are not new, given that it has previously raised objections citing such authority regarding similar issues.
27  Similarly, New York responds that Mr. Chanin's report and 23  Id. at 22-25.
24  NRC Staff Answer to NYS-12C at 10-25. Entergy also states that positions in Mr. Chanin's report could have been filed earlier and are thus impermissible support for New York, but does not object to the timeliness of NYS-12C's challenge to Section G of the FSEIS. See Entergy Answer to NYS-12C at 17 n.90.
25  NRC Staff Answer to NYS-12C at 10, 12 & n.25, 19-20, 23-24.
26  See id. at 14, 17-20, 22.
27  New York NYS-12C Reply at 5-6.      the documents cited therein were timely filed because NYS-12C was triggered by the FSEIS's response to NYS-12/12A/12B rather than these documents that support the proposed amended contention.
28  New York also objects to the NRC Staff's supposition that contentions may not be filed against licensing documents issued by the NRC Staff.
29  Further, New York represents that it has provided enough information to support its claims and has not sought to impose a more restrictive "worst-case" SAMA analysis on the review of Entergy's LRA for Indian Point Units 2 and 3 (IP2 and IP3) than NRC regulations require.
30  F. Board Decision The NRC Staff is mistaken that its environmental review is immune from challenge in adjudicatory proceedings. It is true that the NRC Staff's safety review is not directly subject to challenge, because it is the sufficiency of the license application that is subject to litigation, not the sufficiency of the NRC Staff's review of that application.
31  Nevertheless, the structure of 10 C.F.R. § 2.309(f)(2) permits new or amended contentions to be filed against multiple forms and stages of the NRC Staff's environmental review and, accordingly, such claims are within the scope of this proceeding pursuant to Section 2.309(f)(1)(iii). Moreover, as we have stated above, Section 2.309(f)(2) allows contentions originally filed against an applicant's ER to be amended if there are data and conclusions in NRC Staff environmental documents "that differ significantly from the data or conclusions in the applicant's documents."
32  NYS-12C's claims regarding the sufficiency of Entergy's and the NRC Staff's SAMA reviews mirror the basic allegation found in the consolidated contention that NYS-12C seeks to amend - namely, that 28  Id. at 8. 29  Id. at 7-11.
30  Id. 13-17. 31  See AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-08-23, 68 NRC 461, 482 (2008).
32  10 C.F.R. § 2.309(f)(2).
Entergy's and the NRC Staff's use of the MACCS2 code leads to an underestimation of the cleanup costs from a severe accident.
33  That overarching aspect of this contention, including its citation to the 1996 Sandia National Laboratories Report, has not differed significantly in NYS-12C and is within the scope of the already consolidated NYS-12/12A/12B. New York's citations to the APA, NRC regulations, and CEQ regulations are neither untimely nor improper at this juncture. As we have previously noted, the NRC Staff is bound to


follow the APA and NRC regulations in carrying out its duties under NEPA.
considering the environmental impacts of long-term on-site storage beyond this period in an ongoing rulemaking.54 Likewise, Entergy contends that any disputes concerning decommissioning of IP2 and IP3, increases in spent fuel generation, and the environmental impacts of independent spent fuel storage installations are not subject to the NRCs license renewal review.55 Entergy depicts these claims by New York as outside the scope of this proceeding, immaterial to the NRCs licensing decision in this proceeding, and failing to raise a genuine dispute of law or fact.56 Entergy also claims that NYS-17B is inadmissible pursuant to 10 C.F.R. § 2.309(f)(1)(v) because the declaration submitted by New Yorks expert, Dr. Stephen C. Sheppard, does not support New Yorks arguments and lacks a reasoned basis or explanation.57 Entergy also resists New Yorks requests for an exemption or waiver from the Waste Confidence Rule. Entergy portrays exemption requests as beyond the powers of a licensing board to grant and represents that the provisions of 10 C.F.R. § 2.335 are the exclusive method by which an intervenor may secure the waiver of the application of NRC regulations.58 Finally, according to Entergy, New York has not successfully met the four-factor test for granting waiver petitions that was articulated by the Commission in Millstone.59 D.     NRC Staff Answer The NRC Staff does not oppose admission of those aspects of NYS-17B that amend NYS-17A to refer to the FSEIS, but objects to admission of those aspects of NYS-17B 54 Id. at 19-24.
34  Moreover, the NRC gives deference to CEQ regulations to the ex tent that they do not "'have a substantive impact on the way in which the Commission performs its regulatory functions.'"
55 Id. at 25-30.
35  Similarly, the fact that New York brings factual and expert support that might be years old to support its claims does not render the contention buttressed by that support either untimely or inadmissible. As we read it, NYS-12C arises from the NRC Staff's FSEIS, which explicitly attempts to resolve concerns raised in NYS-12/12A/12B.
56 See id. at 19-30, 32.
36  The expert analyses brought in NYS-12C are not the underlying basis giving rise to the contention but are tools used by New York to attempt to refute the validity of the NRC Staff's analysis. The basis of the contention pursuant to Section 2.309(f)(1)(ii) is that the NRC Staff's analysis in the FSEIS underestimates severe accident cleanup costs due to use of the MACCS2 code. Therefore, the contention is based on new information, the FSEIS, and is not "late filed." Also, the fact that Mr. Chanin has asserted a plausible link between the documents he cites and the NRC Staff's SAMA analysis that uses the MACCS2 code constitutes adequate expression of an expert opinion pursuant to Section 2.309(f)(1)(v) and raises a genuine dispute 33  See LBP-08-13, 68 NRC at 100-02.
57 Id. at 30-32.
34  See LBP-10-13, 71 NRC at __ (slip op. at 28).
58 Id. at 33-38.
35  Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), CLI-91-02, 33 NRC 61, 72 n.3 (1991) (citations omitted).
59 Id. at 38-46.
36  See FSEIS at G-22 to G-24.      pursuant to Section 2.309(f)(1)(vi) as to the sufficiency of the NRC Staff's SAMA analysis as articulated in the FSEIS. The extent to which Mr. Chanin's opinion is correct is a merits question that we leave for the evidentiary hearing in this proceeding. Accordingly, we find that NYS-12C is admissible and consolidate it with NYS-12/12A/12B as Consolidated NYS-12C.
III. NYS-17B A. Background In granting New York's hearing request in this proceeding, we admitted NYS-17, which alleged that Entergy's ER  fails to include an analysis of adverse impacts on off-site land use of license renewal and thus erroneously concludes that relicensing of IP2 and IP3 "will have a significant positive impact on the communities surrounding the station" (ER Section 8.5) and understates the adverse impact on off-site land use (ER Sections 4.18.4 and 4.18.5) in violation of 10 C.F.R. Part 51, Subpart A, Appendix B.
37    Our ruling stated in pertinent part: In conducting its analysis of the impact of the license renewal on land use, Entergy should have considered the impact on real estate values that would be caused by license renewal or nonrenewal. NRC Regulations do not limit consideration to tax-driven land-use changes. Table B-1 merely notes that "significant changes in land use may be associated with population and tax-revenue changes resulting from license renewal."  It does not limit consideration to tax-driven land-use changes. Accordingly, we admit NYS-17 as a contention of omission.
38  On February 27, 2009, New York submitted amended contention NYS-17A, which was based on the NRC Staff's DSEIS, alleging that:  The [DSEIS] fails to address the impact of the continued operation of IP2 and IP3 for another 20 years on off-site land use, including real estate values in the surrounding area in violation of 10 C.F.R. §§ 51.71(a), 51.71(d), 51.95(c)(1), and 51.95(c)(4).
39 37  LBP-08-13, 68 NRC at 113.
38  Id. at 116. 39  June 16, 2009 Licensing Board Order at 7.        We admitted NYS-17A and consolidated it with NYS-17, ruling that "this amended contention update[d] the original to reflect that New York contends that the NRC Staff erred in a similar manner to Entergy and that the original contention was now relevant to the Draft SEIS, as well as to the ER."
40  On April 22, 2010, we denied a Motion for Summary Disposition of NYS-17/17A filed by Entergy, ruling that NYS-17/17A was  within the scope of this proceeding and that there remain[ed] a genuine dispute over a material fact regarding the socioeconomic environmental impacts of license renewal on property values adjacent to [Indian Point].
41    However, in so ruling, the Board included the following caveat: We agree with Entergy that proffered NEPA contentions relating to on-site spent fuel storage are outside the scope of this proceeding due to the Waste Confidence Rule (codified as 10 C.F.R. § 51.23), whose continuing viability we recently certified to the Commission.
42 B. New York Motion and Requests Related to Proposed NYS-17B On January 24, 2011, New York filed (1) a Motion for Leave to File Timely Amended Bases to Contention 17A (Now to be Designated Contention 17B) 43; (2) a Request that the proposed amended bases for NYS-17A be deemed not barred by 10 C.F.R. § 51.23(b), that we exempt New York from the requirements of Section 51.23(b), or that we certify the waiver of 10 40  Id. at 8. 41  Licensing Board Memorandum and Order (Denying Entergy's Motion for the Summary Disposition of NYS Contention 17/17A) (Apr. 22, 2010) at 11-17 (unpublished) [hereinafter Apr. 22, 2010 Licensing Board Memorandum and Order].  


42  Id. at 13-14.
concerning the environmental impacts or alternatives associated with the generation and storage of spent fuel and opposes New Yorks exemption request and waiver petition.60 The NRC Staff characterizes NYS-17B as an inadmissible challenge to the Waste Confidence Rule and therefore as outside the scope of this proceeding because the contention attempts to litigate an environmental issue specifically barred by NRC regulations.61 Further, the NRC Staff represents that New Yorks assumptions regarding the timeline for removal of nuclear waste are incorrect, and thus the contention lacks the requisite factual basis.62 In addition, NYS-17B is unjustifiably late-filed, says the NRC Staff, because the new Waste Confidence Rule and Entergys 2009 Decommissioning Plan have not produced any new expectation for or information regarding the removal of spent fuel from Indian Point. In addition, the Staff notes that New York has for the first time styled this contention a contention of inadequacy despite its prior designation as a contention of omission.63 Similarly, the NRC Staff urges that New Yorks waiver petition is unwarranted, given that New York has not shown that site-specific environmental impacts at Indian Point associated with the Waste Confidence Rule are significantly different from those in other license renewal proceedings subject to the Rule and given that the Commissions promulgation of the new Waste Confidence Rule specifically considered (and dismissed consideration of) the concerns raised in NYS-17B.64 Finally, the NRC Staff argues that the Board is not empowered to grant exemptions from NRC regulations, New York would not qualify as the type of party entitled to an exemption, and the Commission specifically suggested New York could pursue a waiver petition 60 NRC Staff Answer to NYS-17B at 2.
43  State of New York Motion for Leave to File Timely Amended Bases to Contention 17A (Now to be Designated Contention 17B) (Jan. 24, 2011) [hereinafter New York Motion for Leave to File NYS-17B].
61 Id. at 21-26.
C.F.R. § 51.23(b);
62 Id. at 26-27.
44 and (3) a proposed Contention 17B (NYS-17B) containing the amended bases.45  Proposed NYS-17B reads: The FSEIS fails to address the impact of the continued operation of IP2 and IP3 for another 20 years on offsite land use, including real estate values in the surrounding area in violation of 10 C.F.R. §§ 51.71(a), 51.71(d), 51.95(c)(1), and 51.95(c)(4).
63 Id. at 27-30.
46  Using the update to the Waste Confidence Rule promulgated by the NRC on December 23, 2010, as its starting point, New York asserts that there is no longer a date certain by which spent fuel will be removed from the Indian Point site, and that "there is every reason to believe that spent fuel will remain at the Indian Point site" for an indefinite period following plant shutdown after license renewal.
64 Id. at 34-37.
47  Accordingly, New York argues that granting Entergy's LRA for IP2 and IP3 "will perpetuate depressed land values and reduced tax revenues."
48  Moreover, because in its view the FSEIS did not cure the alleged omissions in Entergy's ER and the DSEIS by analyzing the impacts to off-site property values and tax revenues from long-term storage of spent fuel, New York argues that the FSEIS does not sufficiently address this issue.
49 44  State of New York's Request for a Determination that the Proposed Amended Bases for Contention 17A are not Barred by 10 C.F.R. § 51.23(b), or that Exemption from the Requirements of 10 C.F.R. § 51.23(b) Should be Granted, or that the State has Made a Prima Facie Case that § 51.23(b) Should be Waived as Applied to Contention 17B (Jan. 24, 2011) [hereinafter New York Alternative Requests Re: NYS-17B].  


45  State of New York Contention 17B (Jan. 24, 2011) [hereinafter NYS-17B].
to lift the restrictions of the Waste Confidence Rule when that Rule was updated.65 E.      New York Reply New York replies that NYS-17B was timely filed because it was submitted consistent with prior Board Orders that deemed analogous challenges as timely during earlier Waste Confidence Rule rulemaking announcements and that NYS-17B was filed within thirty days of the new Rules promulgation.66 Similarly, New York asks the Board to regard the predicted dates for spent fuel removal in the new Waste Confidence Rule as previously unavailable new information to permit admission of NYS-17Bs new bases pursuant to 10 C.F.R. § 2.309(f)(2).67 New York also resists labeling NYS-17B as a challenge to the Waste Confidence Rule and reaffirms its position that the environmental impacts of long-term spent fuel storage are within the scope of this license renewal proceeding due to the increased waste generation resulting from license renewal, the updated Waste Confidence Rules extension of the date for on-site storage of that increased waste, the FSEISs discussion of the environmental impacts of the uranium fuel cycle, and off-site land uses classification as a Category 2 issue.68 According to New York, its expert, Dr. Sheppard, has outlined a genuine dispute over these site-specific (rather than generic) impacts to off-site property values that is material to the NRCs licensing decision in this proceeding, given the significant adverse impact that license renewal could inflict on property values surrounding Indian Point.69 Finally, New York insists that the Board does have the authority to grant an exemption from the Waste Confidence Rule and that no Commission precedent dictates otherwise.70 65 Id. at 38-40.
46  Id. at 2. Entergy and the NRC Staff filed Answers to New York's filings associated with NYS-17B on February 18, 2011. Applicant's Answer to Proposed Amended Contention New York State 17B and the Associated Request for Exemption and/or Waiver of 10 C.F.R. § 51.23(b) (Feb. 18, 2011) [hereinafter Entergy Answer to NYS-17B]; NRC Staff's Answer to the State of New York's Motion for Leave to File Amended Bases to Contention 17A (To be Designated 17B) and Request for an Exemption or Waiver (Feb. 18, 2011) [hereinafter NRC Staff Answer to NYS-17B]. New York filed its Reply on March 4, 2011. State of New York's Combined Reply to the Answers of Entergy and NRC Staff to the State's Proposed Amended Contention NYS-17B (Mar. 4, 2011) [hereinafter New York NYS-17B Reply].  
66 New York NYS-17B Reply at 3-5.
67 Id.
68 Id. at 5-8, 11-17.
69 Id. at 9-11, 19-20.


47  New York Motion for Leave to File NYS-17B at 1-2.
F.      Board Decision The Board finds that NYS-17B is within the scope of this proceeding and that there exists a genuine dispute of material fact regarding the socioeconomic environmental impacts of license renewal on property values adjacent to the IPEC. NYS-17B differs from previously admitted NYS-17/17A primarily in the substitution of the FSEIS for the DSEIS and, in accord with the Boards previous rulings,71 we admit NYS-17B insofar as it applies the bases of NYS-17/17A to the FSEIS instead of the DSEIS.
48  Id. at 6.      New York maintains that this contention is based on new and materially different information because of the new Waste Confidence Rule's shift from a date certain that spent fuel would be removed from the site to an open-ended timeline.
New York attempts to justify its addition of new bases to NYS-17/17A with the Commissions issuance of a revised Waste Confidence Rule and Decision, arguing that there is no longer a date certain of 2025 for the removal of spent fuel from IPEC, specifically stating that [i]f the licenses for IP2 and IP3 are not extended, owners and potential purchasers of land adjacent to Indian Point can contemplate that the site will be cleared of an operating nuclear plant and the structures associated with operation of the plant by 2025.72 This point is irrelevant because the Waste Confidence Rule has never specified a timetable for the removal of spent fuel and NRC regulations have long envisioned the possibility of spent fuel remaining on reactor sites until the end of site decommissioning  a general period of thirty to sixty years beyond the facilitys licensed life.73 New York also argues that the no-action alternative would 70 Id. at 17-19.
50  Further, New York represents that this amended contention is timely because it was filed within thirty days of the new Waste Confidence Rule's promulgation.
71 See June 16, 2009 Licensing Board Order at 8; LBP-08-13, 68 NRC at 116.
51  Together with its Motion to add the new bases of NYS-17B to NYS-17/17A, New York provides an alternative pleading that argues claims arising from the long-term on-site storage of spent fuel are not barred by the updated Waste Confidence Rule but, if we were to rule contrary to that position, New York asks the Board to either exempt New York from that Rule or to certify a request for waiver of that Rule to the Commission.
72 NYS-17B at para. 11.
52  C. Entergy Answer Entergy opposes admission of NYS-17B and New York's proposed alternative remedies of exemption or waiver. Entergy maintains that NYS-17B and its associated waiver petition are untimely because the possibility of long-term storage of spent fuel at the Indian Point site was publicly known and acknowledged by New York for at least one year before New York submitted its pleadings related to NYS-17B.
73 See 10 C.F.R. §§ 50.82(a)(3) (Decommissioning will be completed within 60 years of permanent cessation of operations.), 51.23(a) (generically determining that, if necessary, spent fuel generated in any reactor can be stored safely and without significant environmental impacts for at least 60 years beyond the licensed life for operation (which may include the term of a revised or renewed license) of that reactor in a combination of storage in its spent fuel storage basin and at either onsite or offsite independent spent fuel storage installations.
53  Regardless of timeliness, Entergy asserts that this contention is not admissible because the Waste Confidence Rule has generically resolved the challenges that are at the heart of NYS-17B, which relate to the long-term on-site storage of spent fuel at Indian Point for up to sixty years after cessation of operations, and is also inadmissible because the Commission is 49  Id. at 4-5. 50  Id. at 1-4. 51  Id. at 3. 52  New York Alternative Requests Re: NYS-17B at 2--11, 13-20.
Further, the Commission believes there is reasonable assurance that sufficient mined geologic repository capacity will be available to dispose of the commercial high-level radioactive waste and spent fuel generated in any reactor when necessary.); Consideration of Environmental Impacts of Temporary Storage of Spent Fuel After Cessation of Reactor Operation, 55 Fed.
53  Entergy Answer to NYS-17B at 15-19.
considering the environmental impacts of long-term on-site storage beyond this period in an ongoing rulemaking.
54  Likewise, Entergy contends that any disputes concerning decommissioning of IP2 and IP3, increases in spent fuel generation, and the environmental impacts of independent spent fuel storage installations are not subject to the NRC's license


renewal review.
substantially increase the beneficial uses for land adjacent (within 2 miles) to the IPEC site and increase the value of that land, whereas extended operation of IP2 and IP3, and the presence of the additional waste they generate, will deprive adjacent lands of the economic recovery that they would otherwise enjoy.74 Further, New York argues that its new bases should be allowed because the impacts on property values of spent fuel are site-specific and are exempt from the provisions of 10 C.F.R. § 51.23(b).75 We disagree. The presence of spent fuel is generic to all reactor sites under both the Generic Environmental Impact Statement (GEIS) for License Renewals and the Waste Confidence Rule.76 To argue that the presence of spent fuel itself on the site affects property values is to assert that there is an environmental impact from the presence of spent fuel that must be assessed on a site-specific basis, contradicting the language of the Waste Confidence Rule, 10 C.F.R. § 51.23(b), which states that there is no such requirement.77 In promulgating its Reg. 38,472, 38,474 (Sept. 18, 1990) (generically determining that, if necessary, spent fuel generated in any reactor can be stored safely and without significant environmental impacts for at least 30 years beyond the licensed life for operation (which may include the term of a revised or renewed license) of that reactor at its spent fuel storage basin or at either onsite or offsite independent spent fuel storage installations.); Requirements for Licensee Actions Regarding the Disposition of Spent Fuel Upon Expiration of Reactor Operating Licenses, 49 Fed. Reg.
55  Entergy depicts these claims by New York as outside the scope of this proceeding, immaterial to the NRC's licensing decision in this proceeding, and failing to raise a  
34,688, 34,694 (Aug. 31, 1984) (generically determining that for at least 30 years beyond the expiration of reactor operating licenses no significant environmental impacts will result from the storage of spent fuel in reactor facility storage pools or independent spent fuel storage installations located at reactor or away-from-reactor sites.).
74 NYS-17B at paras. 5-7.
75 Id. at para. 19.
76 10 C.F.R. Part 51, app. B, tbl. B-1 (labeling each aspect of the uranium fuel cycle and waste management a Category 1 issue exempt from site-specific environmental review); id. § 51.23(a)
(The Commission has made a generic determination that, if necessary, spent fuel generated in any reactor can be stored safely and without significant environmental impacts for at least 60 years beyond the licensed life for operation (which may include the term of a revised or renewed license) of that reactor in a combination of storage in its spent fuel storage basin and at either onsite or offsite independent spent fuel storage installations.).
77 Id. § 51.23(b) (. . . no discussion of any environmental impact of spent fuel storage in reactor facility storage pools or independent spent fuel storage installations (ISFSI) for the period following the term of the reactor operating license or amendment, reactor combined license or


genuine dispute of law or fact.
update to the Waste Confidence Rule, the Commission stated that:
56  Entergy also claims that NYS-17B is inadmissible pursuant to 10 C.F.R. § 2.309(f)(1)(v) because the declaration submitted by New York's expert, Dr. Stephen C. Sheppard, does not support New York's arguments and lacks a reasoned basis or
What is not considered in [reactor licensing and rector license renewal]
proceedingsdue to the generic determination in 10 CFR 51.23(a)is the potential environmental impact of storage of spent fuel for a 60-year period after the end of licensed operations or the potential environmental impacts of ultimate disposal. Environmental analysis for this period is covered by the environmental analysis the NRC has done in this update to the Waste Confidence Decision . . . .78 Because the Commission has specifically barred consideration of the environmental impacts of long-term storage of spent fuel in adjudicatory proceedings, this aspect of NYS-17B is inadmissible as beyond the scope of this proceeding pursuant to 10 C.F.R. § 2.309(f)(1)(iii).
Nevertheless, the negative effect on property values predicted by Dr. Sheppard that would result from the longer-term presence of spent fuel anticipated by the updated Waste Confidence Rule is not an environmental impact barred by the Waste Confidence Rule. The potential for spent fuel to indefinitely stay on-site is not an environmental impact associated with the spent fuel itself; rather, it is the occupation of the site by components of IPEC that has the potential to bring down property values if license renewal is granted. It is the value and uses of adjacent property that are site-specific environmental impacts.79 A challenge based on the impact of IPEC components long-term on-site existence upon surrounding property values is not barred by the Waste Confidence Rule.
Because the admission of NYS-17B as limited permits an analysis of the putative positive property value impact of the no-action alternative compared to the property value impact of the proposed action, we find it unnecessary to rule on New Yorks request for an amendment, or initial ISFSI license or amendment for which application is made, is required in any environmental report, environmental impact statement, environmental assessment, or other analysis prepared in connection with the issuance or amendment of an operating license for a nuclear power reactor under parts 50 and 54 of this chapter . . . .).
78 Waste Confidence Decision Update, 75 Fed. Reg. 81,037, 81,041 (Dec. 23, 2010).
79 10 C.F.R. Part 51, app. B, tbl. B-1 (Significant changes in land use may be associated with population and tax revenue changes resulting from license renewal.).


explanation.
exemption to or a waiver from the provisions of Section 51.23(b). Accordingly, NYS-17B, as limited, flows from the publication of the FSEIS,80 is timely, and is admitted and consolidated with NYS-17/17A as Consolidated NYS-17B.81 IV.     AMENDED NYS-25 A.     Background In granting New Yorks hearing request in this proceeding, we admitted Contention NYS-25, which alleged that Entergys LRA lacked [a]n adequate plan to monitor and manage the effects of aging due to embrittlement of the reactor pressure vessels (RPVs) and the associated internals.82 NYS-25, as originally submitted, conceded that Entergys LRA alluded to the effects of thermal shock transients on the reactors at Indian Point, but New York, through its expert, argued that a degradation in ductility (embrittlement) will adversely affect the reactors ability to withstand pressurized thermal shock transients.83 Therefore, NYS-25 claimed that Entergys LRA was inadequate because it did not contain any evaluation of the consequences of embrittlement in its analysis of the effect of transient loads.84 NYS-25 characterized this as a fatal omission in Entergys LRA because, without such an evaluation, the LRA failed to show that the embrittled RPV internal structures will not fail [during the period of extended operations] and that a coolable core geometry will be maintain[ed] subsequent to a
57 Entergy also resists New York's requests for an exemption or waiver from the Waste Confidence Rule. Entergy portrays exemption requests as beyond the powers of a licensing board to grant and represents that the provisions of 10 C.F.R. § 2.335 are the exclusive method by which an intervenor may secure the waiver of the application of NRC regulations.
[Design Basis Loss of Coolant Accident].85 We found that this contention raised a genuine 80 See NYS-17B at paras. 21-23.
58  Finally, according to Entergy, New York has not successfully met the four-factor test for granting waiver petitions that was articulated by the Commission in Millstone
81 While not necessary to our decision, we agree with Entergy and the NRC Staff that the Board does not have the authority to exempt a litigant from the import of the Waste Confidence Rule and that submission of a waiver request to the Commission would be inappropriate based on the facts presented here.
.59  D. NRC Staff Answer The NRC Staff does not oppose admission of those aspects of NYS-17B that amend NYS-17A to refer to the FSEIS, but objects to admission of those aspects of NYS-17B 54  Id. at 19-24.
82 LBP-08-13, 68 NRC at 129.
55  Id. at 25-30.
83 Id. at 131.
56  See id. at 19-30, 32.
84 Id.
57  Id. at 30-32.
85 Id.
58  Id. at 33-38.
59  Id. at 38-46.
concerning "the environmental impacts or alternatives associated with the generation and storage of spent fuel" and opposes New York's exemption request and waiver petition.
60  The NRC Staff characterizes NYS-17B as an inadmissible challenge to the Waste Confidence Rule and therefore as outside the scope of this proceeding because the contention attempts to litigate an environmental issue specifically barred by NRC regulations.
61  Further, the NRC Staff represents that New York's assumptions regarding the timeline for removal of nuclear waste are incorrect, and thus the contention lacks the requisite factual basis.
62  In addition, NYS-17B is unjustifiably late-filed, says the NRC Staff, because the new Waste Confidence Rule and Entergy's 2009 Decommissioning Plan have not produced any new expectation for or information regarding the removal of spent fuel from Indian Point. In addition, the Staff notes that New York has for the first time styled this contention a contention of inadequacy despite its prior designation as a contention of omission.
63  Similarly, the NRC Staff urges that New York's waiver petition is unwarranted, given that New York has not shown that site-specific environmental impacts at Indian Point associated with the Waste Confidence Rule are significantly different from those in other license renewal proceedings subject to the Rule and given that the Commission's promulgation of the new Waste Confidence Rule specifically considered (and dismissed consideration of) the concerns raised in NYS-17B.
64  Finally, the NRC Staff argues that the Board is not empowered to grant exemptions from NRC regulations, New York would not qualify as the type of party entitled to an exemption, and the Commission specifically suggested New York could pursue a waiver petition 60  NRC Staff Answer to NYS-17B at 2.
61  Id. at 21-26.
62  Id. at 26-27.
63  Id. at 27-30.
64  Id. at 34-37.
to lift the restrictions of the Waste Confidence Rule when that Rule was updated.
65  E. New York Reply New York replies that NYS-17B was timely filed because it was submitted consistent with prior Board Orders that deemed analogous challenges as timely during earlier Waste Confidence Rule rulemaking announcements and that NYS-17B was filed within thirty days of the new Rule's promulgation.
66  Similarly, New York asks the Board to regard the predicted dates for spent fuel removal in the new Waste Confidence Rule as previously unavailable new information to permit admission of NYS-17B's new bases pursuant to 10 C.F.R. § 2.309(f)(2).
67 New York also resists labeling NYS-17B as a challenge to the Waste Confidence Rule and reaffirms its position that the environmental impacts of long-term spent fuel storage are within the scope of this license renewal proceeding due to the increased waste generation resulting from license renewal, the updated Waste Confidence Rule's extension of the date for on-site storage of that increased waste, the FSEIS's discussion of the environmental impacts of the uranium fuel cycle, and off-site land use's classification as a Category 2 issue.
68  According to New York, its expert, Dr. Sheppard, has outlined a genuine dispute over these site-specific (rather than generic) impacts to off-site property values that is material to the NRC's licensing decision in this proceeding, given the significant adverse impact that license renewal could inflict on property values surrounding Indian Point.
69  Finally, New York insists that the Board does have the authority to grant an exemption from the Waste Confidence Rule and that no Commission precedent dictates otherwise.
70 65  Id. at 38-40.
66  New York NYS-17B Reply at 3-5.
67  Id. 68  Id. at 5-8, 11-17.
69  Id. at 9-11, 19-20.
F. Board Decision The Board finds that NYS-17B is within the scope of this proceeding and that there exists a genuine dispute of material fact regarding the socioeconomic environmental impacts of license renewal on property values adjacent to t he IPEC. NYS-17B differs from previously admitted NYS-17/17A primarily in the substitution of the FSEIS for the DSEIS and, in accord with the Board's previous rulings, 71 we admit NYS-17B insofar as it applies the bases of NYS-17/17A to the FSEIS instead of the DSEIS. New York attempts to justify its addition of new bases to NYS-17/17A with the Commission's issuance of a revised Waste Confidence Rule and Decision, arguing that there is no longer a "date certain" of 2025 for the removal of spent fuel from IPEC, specifically stating that "[i]f the licenses for IP2 and IP3 are not extended, owners and potential purchasers of land adjacent to Indian Point can contemplate that the site will be cleared of an operating nuclear plant and the structures associated with operation of the plant by 2025."
72  This point is irrelevant because the Waste Confidence Rule has never specified a timetable for the removal of spent fuel and NRC regulations have long envisioned the possibility of spent fuel remaining on reactor sites until the end of site decommissioning - a general period of thirty to sixty years beyond the facility's licensed life.
73  New York also argues that the no-action alternative would 70  Id. at 17-19.
71  See June 16, 2009 Licensing Board Order at 8; LBP-08-13, 68 NRC at 116.
72  NYS-17B at para. 11.
73  See 10 C.F.R. §§ 50.82(a)(3) ("Decommissioning will be completed within 60 years of permanent cessation of operations."), 51.23(a) (generically determining "that, if necessary, spent fuel generated in any reactor can be stored safely and without significant environmental impacts for at least 60 years beyond the licensed life for operation (which may include the term of a revised or renewed license) of that reactor in a combination of storage in its spent fuel storage basin and at either onsite or offsite independent spent fuel storage installations.
Further, the Commission believes there is reasonable assurance that sufficient mined geologic repository capacity will be available to dispose of the commercial high-level radioactive waste and spent fuel generated in any reactor when necessary."); Consideration of Environmental Impacts of Temporary Storage of Spent Fuel After Cessation of Reactor Operation, 55 Fed.      substantially increase the beneficial uses for land adjacent (within 2 miles) to the IPEC site and increase the value of that land, whereas extended operation of IP2 and IP3, and the presence of the additional waste they generate, will deprive adjacent lands of the economic recovery that they would otherwise enjoy.
74  Further, New York argues that its new bases should be allowed because the impacts on property values of spent fuel are site-specific and are exempt from the provisions of 10 C.F.R. § 51.23(b).
75  We disagree. The presence of spent fuel is generic to all reactor sites under both the Generic Environmental Impact Statement (GEIS) for License Renewals and the Waste Confidence Rule.
76  To argue that the presence of spent fuel itself on the site affects property values is to assert that there is an environmental impact from the presence of spent fuel that must be assessed on a site-specific basis, contradicting the language of the Waste Confidence Rule, 10 C.F.R. § 51.23(b), which states that there is no such requirement.
77  In promulgating its Reg. 38,472, 38,474 (Sept. 18, 1990) (generically determining "that, if necessary, spent fuel generated in any reactor can be stored safely and without significant environmental impacts for at least 30 years beyond the licensed life for operation (which may include the term of a revised or renewed license) of that reactor at its spent fuel storage basin or at either onsite or offsite independent spent fuel storage installations."); Requirements for Licensee Actions Regarding the Disposition of Spent Fuel Upon Expiration of Reactor Operating Licenses, 49 Fed. Reg.
34,688, 34,694 (Aug. 31, 1984) (generically determining "that for at least 30 years beyond the expiration of reactor operating licenses no significant environmental impacts will result from the storage of spent fuel in reactor facility storage pools or independent spent fuel storage installations located at reactor or away-from-reactor sites.").  


74  NYS-17B at paras. 5-7.
dispute that was within the scope of this proceeding regarding [w]hether an AMP [Aging Management Program] is necessary to manage the cumulative effects of embrittlement of the RPVs and associated internals.86 On July 14, 2010, Entergy submitted its ninth LRA amendment, NL-10-063, which includes Entergys Reactor Vessel Internals Program.87 Based on LRA Amendment 9, New York filed a Motion on September 15, 2010, to add new bases to the already-admitted contention, NYS-25.88 B.       New York New Bases for NYS-25 New York presents new bases for NYS-25 to alter the focus of its contention from one of omission to one of inadequacy, asserting that LRA Amendment 9 is inadequate under 10 C.F.R.
75  Id. at para. 19.
§ 54.51(c)(1)(iii).89 New York concedes that LRA Amendment 9 attempts to provide an AMP for Indian Points reactor pressure vessels and internal components, but claims that Entergys LRA remains inadequate for the following new reasons:
76  10 C.F.R. Part 51, app. B, tbl. B-1 (labeling each aspect of the uranium fuel cycle and waste management a Category 1 issue exempt from site-specific environmental review); id.
(1) failing to consider the synergistic effects of embrittlement and metal fatigue on RPV and internals; (2) failing to provide sufficient objective details about when it will conduct and complete baseline inspections and measurements; (3) failing to provide sufficient objective details about how and when it will implement corrective actions to address problems identified with embrittlement; (4) failing to include adequate inspection techniques to identify embrittlement issues for 86 Id.
§ 51.23(a) ("The Commission has made a generic determination that, if necessary, spent fuel generated in any reactor can be stored safely and without significant environmental impacts for at least 60 years beyond the licensed life for operation (which may include the term of a revised or renewed license) of that reactor in a combination of storage in its spent fuel storage basin and at either onsite or offsite independent spent fuel storage installations.").  
87 LRA amend. 9.
88 State of New Yorks Motion for Leave to File Additional Bases for Previously-Admitted Contention NYS-25 in Response to Entergys July 14, 2010 Proposed Aging Management Program for Reactor Pressure Vessels and Internal Components (Sept. 15, 2010) [hereinafter NYS-25]. Entergy and the NRC Staff filed Answers opposing New Yorks Motion on October 12, 2010. Applicants Answer to Amended Contention New York State 25 Concerning Aging Management of Embrittlement of Reactor Vessel Internals (Oct. 12, 2010) [hereinafter Entergy Answer to NYS-25]; NRC Staffs Answer to State of New Yorks Motion for Leave to File Additional Bases for Previously-Admitted Contention NYS-25 (Oct. 12, 2010) [hereinafter NRC Staff Answer to NYS-25]. New York filed a Joint Reply to Entergys and the NRC Staffs Answers on October 22, 2010. State of New Yorks Joint Reply to Entergy and NRC Staffs Separate Answers to the States Additional Bases for Previously-Admitted Contention NYS-25 (Oct. 22, 2010) [hereinafter New York NYS-25 Reply].
89 NYS-25 at 5.


77  Id. § 51.23(b) (". . . no discussion of any environmental impact of spent fuel storage in reactor facility storage pools or independent spent fuel storage installations (ISFSI) for the period following the term of the reactor operating license or amendment, reactor combined license or      update to the Waste Confidence Rule, the Commission stated that: What is not considered in [reactor licensing and rector license renewal] proceedings-due to the generic determination in 10 CFR 51.23(a)-is the potential environmental impact of storage of spent fuel for a 60-year period after the end of licensed operations or the potential environmental impacts of ultimate disposal. Environmental analysis for this period is covered by the environmental analysis the NRC has done in this update to the Waste Confidence Decision . . . .
certain RPV internals, including bolts; and (5) relying on vague future commitments to undertake corrective action when Entergy has encountered difficulties in tracking and completing commitments and corrective actions in a timely manner.90 The specific components that New York claims should have been analyzed include:
78  Because the Commission has specifically barred consideration of the environmental impacts of long-term storage of spent fuel in adjudicatory proceedings, this aspect of NYS-17B is inadmissible as beyond the scope of this proceeding pursuant to 10 C.F.R. § 2.309(f)(1)(iii). Nevertheless, the negative effect on property values predicted by Dr. Sheppard that would result from the longer-term presence of spent fuel anticipated by the updated Waste Confidence Rule is not an environmental impact barred by the Waste Confidence Rule. The potential for spent fuel to indefinitely stay on-site is not an environmental impact associated with the spent fuel itself; rather, it is the occupation of the site by components of IPEC that has the potential to bring down property values if license renewal is granted. It is the value and uses of adjacent property that are site-specific environmental impacts.
the core baffle, intermediate shells, former plates and bolts (particularly the re-entrant corners), and including the baffle-to-baffle bolt locations, the core barrel-to-former bolt locations, and baffle-to-former bolt locations, core barrel (and its welds), lower core plate and support structures, clevis bolts, fuel alignment pins, thermal shield, the lower support column and mixer, and the control rods and their associated guide tubes, plates, and welds.91 Relying on the Declaration of Dr. Richard T. Lahey, Jr., New York claims that
79  A challenge based on the impact of IPEC components' long-term on-site existence upon surrounding property values is not barred by the Waste Confidence Rule. Because the admission of NYS-17B as limited permits an analysis of the putative positive property value impact of the no-acti on alternative compared to the property value impact of the proposed action, we find it unnecessary to rule on New York's request for an amendment, or initial ISFSI license or amendment for which application is made, is required in any environmental report, environmental impact statement, environmental assessment, or other analysis prepared in connection with the issuance or amendment of an operating license for a nuclear power reactor under parts 50 and 54 of this chapter . . . .").  
[i]nadequate management of the effects of embrittlement on RPV and internals could result in performance failures and cracks in these components, which could result in the breaking away of parts which would interfere with other components and systems performing their safety functions.92 New York labels these new bases material to the NRCs licensing decision in this proceeding because they identify a threat to public health and safety, and the NRC Staff is obligated to make findings regarding the impact the proposed action will have on the public health and safety before Entergys LRA can be approved as submitted, modified, or rejected.93 C.        Entergy Answer Entergy characterizes New Yorks new bases for NYS-25 as untimely in part and as rais[ing] issues beyond the scope of this proceeding, lack[ing] adequate factual and legal 90 Id. at 6.
91 Id., Additional Bases for Previously-Admitted Contention NYS-25 (Embrittlement of Reactor Pressure Vessels and Associated Internals) at 1 (Sept. 15, 2010) [hereinafter Additional Bases for NYS-25].
92 NYS-25 at 4 (citing Declaration of Dr. Richard T. Lahey, Jr. at paras. 13-14, 16-18 (Sept. 15, 2010)).
93 Id.


78  Waste Confidence Decision Update, 75 Fed. Reg. 81,037, 81,041 (Dec. 23, 2010).
support, and fail[ing] to raise a genuine dispute on a material issue of law or fact.94 First, Entergy represents that there is neither a sufficiently enumerated technical or factual basis nor a specific legal or factual challenge to Entergys reactor vessel internal program, in New Yorks pleading and New Yorks experts declaration, both of which allege that Entergy does not adequately consider the synergistic aging effects of embrittlement and metal fatigue on the RPV and RPV internals.95 Likewise, Entergy urges the Board to hold that New Yorks references to certain effects and components96 (1) do not challenge any specific portion of Entergys LRA Amendment 9, (2) are beyond the scope of the originally-admitted contention, and (3) regarding control rods, are not subject to aging management review.97 Entergy also insists that New Yorks attacks on the requirements of the NRCs Generic Aging Lessons Learned (GALL) Report and Standard Review Plan for License Renewals are statements of what New York believes the NRCs policy ought to be, which is outside the scope of this proceeding. Entergy urges the Board to regard New Yorks concerns about the purported synergistic effects of RPV embrittlement and metal fatigue on the RPV and RPV internals as untimely, without adequate explanation, because, according to Entergy, it included these items in its original LRA and New York has already filed contentions dealing with embrittlement and metal fatigue in its initial hearing request.98 Second, regarding New Yorks claimed omission by Entergy of the timing of inspections to be conducted under the reactor vessel internals program, Entergy argues that this claim 94 Entergy Answer to NYS-25 at 1-2.
79  10 C.F.R. Part 51, app. B, tbl. B-1 ("Significant changes in land use may be associated with population and tax revenue changes resulting from license renewal.").  
95 Id. at 11-14. Part of the Entergys challenge to the new bases admissibility lies in its questioning of the qualifications of Dr. Lahey to weigh in on metallurgy issues, given that he is an expert in multiphase flow and heat transfer technology, not metallurgy. Id. at 2 & n.3.
96 E.g., the intermediate shell and stub tubes, control rods, thermally-aged cast stainless steel in-core components, and boric acid corrosion of the upper RPV head. See id. at 12.
97 Id.
98 Id. at 14-16.


exemption to or a waiver from the provisions of Section 51.23(b). Accordingly, NYS-17B, as limited, flows from the publication of the FSEIS, 80 is timely, and is admitted and consolidated with NYS-17/17A as Consolidated NYS-17B.
neither provides a factual basis nor raises a genuine dispute with respect to Entergys LRA because LRA Amendment 9 adheres to the guidance provided by the Electric Power Research Institute (EPRI) Materials Reliability Program 227 (MRP-227), which lists the frequency of inspections to be conducted for each primary plant componentssomething present in Entergys LRA which New York mistakenly asserts is missing.99 Similarly, relying on the Boards original contention admissibility decision, Entergy categorizes any asserted requirements of baseline inspections before extended operations as outside the scope of this proceeding.100 Third, in response to New Yorks claim that inspection techniques identified in LRA Amendment 9 are inadequate, Entergy states that New York does not raise a genuine dispute nor provide expert support for its specific criticisms of these alleged inadequacies, especially given that Entergy adheres to current requirements in MRP-227 which explain why different inspection techniques are used for different componentsnone of which New York acknowledges in its new bases for NYS-25.101 Fourth, Entergy asks the Board to dismiss New Yorks claim that Entergys LRA Amendment 9 lacks needed provisions for preventative actions, arguing that preventative actions are specified for RVI, although not as part of the RVI Program.102 For example, according to Entergy, the Water Chemistry ControlPrimary and Secondary Program provides for preventative action by maintaining primary water chemistry in accordance with EPRI guidelines to minimize the potential for SCC [stress corrosion cracking] and IASCC [irradiation-99 Id. at 16-17.
81 IV. AMENDED NYS-25 A. Background In granting New York's hearing request in this proceeding, we admitted Contention NYS-25, which alleged that Entergy's LRA lacked "[a]n adequate plan to monitor and manage the effects of aging due to embrittlement of the reactor pressure vessels ('RPVs') and the associated internals."
100 Id. at 17.
82  NYS-25, as originally submitted, conceded that Entergy's LRA alluded to the effects of thermal shock transients on the reactors at Indian Point, but New York, through its expert, argued that "a 'degradation in ductility' (embrittlement) will adversely affect the reactor's ability to withstand pressurized thermal shock transients."
101 Id. at 18-20.
83  Therefore, NYS-25 claimed that Entergy's LRA was inadequate because it did not contain any evaluation of the consequences of embrittlement in its analysis of the effect of transient loads.
102 Id. at 21.
84  NYS-25 characterized this as a fatal omission in Entergy's LRA because, without such an evaluation, the LRA failed to show "'that the embrittled RPV internal structures will not fail [during the period of extended operations] and that a coolable core geometry will be maintain[ed] subsequent to a
[Design Basis Loss of Coolant Accident]."
85  We found that this contention raised a genuine 80  See NYS-17B at paras. 21-23.
81  While not necessary to our decision, we agree with Entergy and the NRC Staff that the Board does not have the authority to exempt a litigant from the import of the Waste Confidence Rule and that submission of a waiver request to the Commission would be inappropriate based on the facts presented here.
82  LBP-08-13, 68 NRC at 129.
83  Id. at 131. 84  Id. 85  Id.       dispute that was within the scope of this proceeding regarding "[w]hether an AMP [Aging Management Program] is necessary to manage the cumulative effects of embrittlement of the RPVs and associated internals."
86    On July 14, 2010, Entergy submitted its ninth LRA amendment, NL-10-063, which includes Entergy's Reactor Vessel Internals Program.
87  Based on LRA Amendment 9, New York filed a Motion on September 15, 2010, to add new bases to the already-admitted


contention, NYS-25.
assisted stress corrosion cracking].103 Moreover, Entergy portrays New Yorks claimed lack of sufficient details in the LRA about future corrective actions as not launching any specific challenge to Entergys LRA because MRP-227, upon which Entergy relies, outlines specific protocol for approaching corrective actions that are consistent with Entergys required corrective action program and quality assurance program as mandated under Part 50.104 Finally, Entergy criticizes New Yorks reliance on a September 2010 NRC audit report of Entergys Vermont Yankee plant to show that Entergy will not meet its requirements under a renewed license for the reactors at Indian Point, arguing that that audit report positively evaluated Entergy and that past performance of a plant is not properly the subject of a license renewal proceeding.105 D.      NRC Staff Answer The NRC Staff also asks the Board to find New Yorks additional bases for NYS-25 inadmissible because, as articulated by the Staff, New York is contesting what it thinks ought to be required for an adequate AMP as opposed to what is required of an applicant under NRC regulations.106 First, the NRC Staff argues that the challenges to the RPV in the new bases for NYS-25 do not raise a genuine dispute with Entergys LRA because the scope of [the] AMP
88 B. New York New Bases for NYS-25 New York presents new bases for NYS-25 to alter the focus of its contention from one of omission to one of inadequacy, asserting that LRA Amendment 9 is inadequate under 10 C.F.R. § 54.51(c)(1)(iii).
[submitted in LRA Amendment 9] does not include the RPV and other components of the reactor coolant system pressure boundary.107 The NRC Staff also asks the Board to find that these challenges are untimely because, without explanation, they seek for the first time to take aim at Entergys original LRA, which discussed RPV neutron embrittlement, the associated TLAAs [Time-Limited Aging Analyses, and] Entergys approach to managing the effects of RPV 103 Id.
89  New York concedes that LRA Amendment 9 attempts to provide an AMP for Indian Point's reactor pressure vessels and internal components, but claims that Entergy's LRA remains inadequate for the following new reasons: (1) failing to consider the synergistic effects of embrittlement and metal fatigue on RPV and internals; (2) failing to provide sufficient objective details about when it will conduct and complete baseline inspections and measurements; (3) failing to provide sufficient objective details about how and when it will implement corrective actions to address problems identified with embrittlement; (4) failing to include adequate inspection techniques to identify embrittlement issues for 86  Id. 87  LRA amend. 9.
104 Id. at 21-22.
88  State of New York's Motion for Leave to File Additional Bases for Previously-Admitted Contention NYS-25 in Response to Entergy's July 14, 2010 Proposed Aging Management Program for Reactor Pressure Vessels and Internal Components (Sept. 15, 2010) [hereinafter NYS-25]. Entergy and the NRC Staff filed Answers opposing New York's Motion on October 12, 2010. Applicant's Answer to Amended Contention New York State 25 Concerning Aging Management of Embrittlement of Reactor Vessel Internals (Oct. 12, 2010) [hereinafter Entergy Answer to NYS-25]; NRC Staff's Answer to State of New York's Motion for Leave to File Additional Bases for Previously-Admitted C ontention NYS-25 (Oct. 12, 2010) [hereinafter NRC Staff Answer to NYS-25]. New York filed a Joint Reply to Entergy's and the NRC Staff's Answers on October 22, 2010. State of New York's Joint Reply to Entergy and NRC Staff's Separate Answers to the State's Additional Bases for Previously-Admitted Contention NYS-25 (Oct. 22, 2010) [hereinafter New York NYS-25 Reply].
105 Id. at 22-23.
89  NYS-25 at 5.      certain RPV internals, including bolts; and (5) relying on vague future commitments to undertake corrective action when Entergy has encountered difficulties in tracking and completing commitments and corrective actions in a timely manner.
106 NRC Staff Answer to NYS-25 at 8.
90  The specific components that New York claims should have been analyzed includethe core baffle, intermediate shells, former plates and bolts (particularly the re-entrant corners), and including the baffle-to-baffle bolt locations, the core barrel-to-former bolt locations, and baffle-to-former bolt locations, core barrel (and its welds), lower core plate and support structures, clevis bolts, fuel alignment pins, thermal shield, the lower support column and mixer, and the control rods and their associated guide tubes, plates, and welds.
107 Id. at 8-9.
91  Relying on the Declaration of Dr. Richard T. Lahey, Jr., New York claims that "[i]nadequate management of the effects of embrittlement on RPV and internals could" result in performance failures and cracks in these components, "which could result in the breaking away of parts which would interfere with other components and systems performing their safety functions."
92  New York labels these new bases material to the NRC's licensing decision in this proceeding because they identify a threat to public health and safety, and the NRC Staff is obligated to make findings regarding the impact the proposed action will have on the public health and safety before Entergy's LRA can be approved as submitted, modified, or rejected.
93 C. Entergy Answer Entergy characterizes New York's new bases for NYS-25 as untimely in part and as "rais[ing] issues beyond the scope of this proceeding, lack[ing] adequate factual and legal 90  Id. at 6. 91  Id., Additional Bases for Previously-Admitted Contention NYS-25 (Embrittlement of Reactor Pressure Vessels and Associated Internals) at 1 (Sept. 15, 2010) [hereinafter Additional Bases for NYS-25].  


92  NYS-25 at 4 (citing Declaration of Dr. Richard T. Lahey, Jr. at paras. 13-14, 16-18 (Sept. 15, 2010)).
neutron embrittlement under 10 C.F.R. § 54.21(c)(1).108 Further, the NRC Staff states that there is no requirement that control rods be subject to an AMP.109 Second, because the LRA considered that the reactor vessel internals environment required consideration of neutron fluence and treated borated water at high and moderate temperatures and recognized three specific programs to deal with the effects of these factors on reactor vessel internals, the NRC Staff posits that New York has not explained which part of Entergys LRA lacks an analysis of the synergistic effects of aging.110 Third, the NRC Staff emphasizes that no regulation requires baseline inspections before the period of extended operation of the components at issue in LRA Amendment 9. According to the NRC Staff, there is nothing in the regulations that requires Entergy to implement action at any specific time, as aging can be adequately managed by taking corrective action when it is needed.111 Nor is there any requirement to take preventative action rather than corrective action, states the NRC Staff, given that the GALL Report approves of corrective measures to the exclusion of preventative measures.112 Finally, the NRC Staff argues that New York cites no requirement for New Yorks preferred inspection technique and that issues relating to Entergys ability to meet commitments made in its LRA are outside the scope of this proceeding.113 108 Id. at 9.
93  Id.      support, and fail[ing] to raise a genuine dispute on a material issue of law or fact."
109 Id. at 9-10.
94  First, Entergy represents that there is neither a sufficiently enumerated technical or factual basis nor a specific legal or factual challenge to Entergy's reactor vessel internal program, in New York's pleading and New York's expert's declaration, both of which allege that Entergy does not adequately consider "the 'synergistic' aging effects of embrittlement and metal fatigue on the RPV and RPV internals."
110 Id. at 10-11.
95  Likewise, Entergy urges the Board to hold that New York's references to certain effects and components 96 (1) do not challenge any specific portion of Entergy's LRA Amendment 9, (2) are beyond the scope of the originally-admitted contention, and (3) regarding control rods, are not subject to aging management review.
111 Id. at 11-12 (citing LBP-08-13, 68 NRC at 140).
97  Entergy also insists that New York's attacks on the requirements of the NRC's Generic Aging Lessons Learned (GALL) Report and Standard Review Plan for License Renewals are statements of what New York believes the NRC's policy ought to be, which is outside the scope of this proceeding. Entergy urges the Board to regard New York's concerns about "the purported synergistic effects of RPV embrittlement and metal fatigue on the RPV and RPV internals" as untimely, without adequate explanation, because, according to Entergy, it included these items in its original LRA and New York has already filed contentions dealing with embrittlement and metal fatigue in its initial hearing request.
112 Id. at 12.
98 Second, regarding New York's claimed omission by Entergy of the timing of inspections to be conducted under the reactor vessel internals program, Entergy argues that this claim 94  Entergy Answer to NYS-25 at 1-2.
113 Id. at 12-13.
95  Id. at 11-14. Part of the Entergy's challenge to the new bases' admissibility lies in its questioning of the qualifications of Dr. Lahey to weigh in on metallurgy issues, given that he is an expert in multiphase flow and heat transfer technology, not metallurgy. Id.
at 2 & n.3.
96  E.g., the intermediate shell and stub tubes, control rods, thermally-aged cast stainless steel in-core components, and boric acid corrosion of the upper RPV head. See id. at 12. 97  Id. 98  Id. at 14-16.
neither provides a factual basis nor raises a genuine dispute with respect to Entergy's LRA because LRA Amendment 9 adheres to the guidance provided by the Electric Power Research Institute (EPRI) Materials Reliability Program 227 (MRP-227), which lists the frequency of inspections to be conducted for each primary plant components-something present in Entergy's LRA which New York mistakenly asserts is missing.
99  Similarly, relying on the Board's original contention admissibility decision, Entergy categorizes any asserted requirements of baseline inspections before extended operations as outside the scope of this proceeding.
100  Third, in response to New York's claim that inspection techniques identified in LRA Amendment 9 are inadequate, Entergy states that New York does not raise a genuine dispute nor provide expert support for its specific criticisms of these alleged inadequacies, especially given that Entergy adheres to current requirements in MRP-227 which explain why different inspection techniques are used for different components-none of which New York acknowledges in its new bases for NYS-25.
101  Fourth, Entergy asks the Board to dismiss New York's claim that Entergy's LRA Amendment 9 lacks needed provisions for preventative actions, arguing that "preventative actions are specified for RVI, although not as part of the RVI Program."
102  For example, according to Entergy, "the Water Chemistry Control-Primary and Secondary Program provides for preventative action by maintaining primary water chemistry in accordance with EPRI guidelines to minimize the potential for SCC [stress corrosion cracking] and IASCC [irradiation-99  Id. at 16-17.
100  Id. at 17. 101  Id. at 18-20.
102  Id. at 21.       assisted stress corrosion cracking]."
103  Moreover, Entergy portrays New York's claimed lack of sufficient details in the LRA about future corrective actions as not launching any specific challenge to Entergy's LRA because MRP-227, upon which Entergy relies, outlines specific protocol for approaching corrective actions that are consistent with Entergy's required corrective action program and quality assurance program as mandated under Part 50.
104  Finally, Entergy criticizes New York's reliance on a September 2010 NRC audit report of Entergy's Vermont Yankee plant to show that Entergy will not meet its requirements under a renewed license for the reactors at Indian Point, arguing that that audit report positively evaluated Entergy and that past performance of a plant is not properly the subject of a license


renewal proceeding.
E.     New York Reply New York replies that the new bases it has submitted for NYS-25 are aimed solely at RPV internals, stresses that the new bases are within the scope of the previously-admitted contention, and clarifies that the new bases mention the RPV itself in order to reiterate out of an abundance of caution NYS-25s original complaint that Entergys LRA still lacks a valid AMP for the RPV itself.114 New York also argues that Entergys reliance on MRP-227 is subject to challenge in this proceeding because that industry-produced document has not yet been endorsed by the NRC and further argues that even if MRP-227 would be endorsed by the NRC, Entergys fulfillment of that documents suggestions would still be subject to challenge in this proceeding because it is only guidance and is not binding.115 New York also claims that it has presented a genuine dispute of material fact over Entergys ability to synergistically manage the effects of aging because Entergy has only claimed that it has several independent (as opposed to synergistic) programs that manage the effects of aging.116 Regarding each of the three aging management programs in LRA Amendment 9 cited by the NRC Staff as meeting New Yorks concerns (namely, Inservice Inspection, Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel, and Water Chemistry ControlPrimary and Secondary Program), New York asserts that each of these, by its terms, does not examine or evaluate the synergistic effects of embrittlement and fatigue leading to components failures and compromised core cooling during a transient shock event . . . .117 In the same vein, New York posits that the Reactor Vessel 114 New York NYS-25 Reply at 4-5 & n.2.
105 D. NRC Staff Answer The NRC Staff also asks the Board to find New York's additional bases for NYS-25 inadmissible because, as articulated by the Staff, New York is contesting what it thinks ought to be required for an adequate AMP as opposed to what is required of an applicant under NRC regulations.
115 Id. at 6-11 (citations omitted).
106  First, the NRC Staff argues that the challenges to the RPV in the new bases for NYS-25 do not raise a genuine dispute with Entergy's LRA because "the scope of [the] AMP
116 Id. at 12-13.
[submitted in LRA Amendment 9] does not include the RPV and other components of the reactor coolant system pressure boundary."
117 Id. at 13-14. We note that New York generally uses the same language in attacking the three programs cited by the NRC Staff. However, for Inservice Inspection, New York complains that by its terms, it does examine or evaluate the synergistic effects of embrittlement and fatigue. Id. at 14 (emphasis added). We assume that this passage, when read in the context
107  The NRC Staff also asks the Board to find that these challenges are untimely because, without explanation, they seek for the first time to take aim at Entergy's original LRA, which discussed "RPV neutron embrittlement, the associated TLAAs [Time-Limited Aging Analyses, and] Entergy's approach to managing the effects of RPV 103  Id. 104  Id. at 21-22.
105  Id. at 22-23.
106  NRC Staff Answer to NYS-25 at 8.
107  Id. at 8-9.      neutron embrittlement under 10 C.F.R. § 54.21(c)(1)."
108  Further, the NRC Staff states that there is no requirement that control rods be subject to an AMP.
109 Second, because "the LRA considered that the reactor vessel internals environment required consideration of neutron fluence and treated borated water at high and moderate temperatures" and recognized three specific programs to deal with the effects of these factors on reactor vessel internals, the NRC Staff posits that New York has not explained which part of Entergy's LRA lacks an analysis of the synergistic effects of aging.
110  Third, the NRC Staff emphasizes that no regulation requires baseli ne inspections before the period of extended operation of the components at issue in LRA Amendment 9. According to the NRC Staff, "there is nothing in the regulations that requires Entergy to implement action at any specific time, as aging can be adequately managed by taking corrective action 'when it is


needed.'"111  Nor is there any requirement to take preventative action rather than corrective action, states the NRC Staff, given that the GALL Report approves of corrective measures to the exclusion of preventative measures.
Head Penetration Inspection Program (cited favorably by the NRC Staff to address New Yorks concerns) by its terms, it does not examine or evaluate the effect of a transient thermal shock on control rod penetrations and seal welds.118 Moreover, New York responds that because a reactors control rods and seal welds are located within the RPV, even MRP-227 and the GALL Report recognize that they are RPV internals and, accordingly, New York argues that these components require aging management review.119 As for its challenges to Entergys proposed inspection techniques, New York insists that it need not bring expert opinions to support its position, given that MRP-227 and the NRCs own opinions elsewhere have questioned the viability of visual testing.120 Finally, New York urges the Board to consider the new bases to NYS-25 as timely filed because they arise out of and criticize the adequacy of Entergys AMP for RPV internals, which did not exist before July 2010.121 F.      Board Decision We hereby grant New Yorks Motion for Leave to add additional bases to previously admitted NYS-25 without altering or amending the contention as written.122 In its original petition to intervene, New York alleged that, with respect to the effects of aging due to embrittlement of RPVs and the associated internals, Entergy had no meaningful of New Yorks general complaint, intended to aver that the Inservice Inspection program does not wrestle with the synergistic effects of embrittlement and fatigue.
112  Finally, the NRC Staff argues that New York cites no requirement for New York's preferred inspection technique and that issues relating to Entergy's ability to meet commitments made in its LRA are outside the scope of this proceeding.
118 Id. at 14-15.
113 108  Id. at 9. 109  Id. at 9-10.
119 Id. at 15.
110  Id. at 10-11.
120 Id. at 15-17.
111  Id. at 11-12 (citing LBP-08-13, 68 NRC at 140).
121 Id. at 17-18.
112  Id. at 12. 113  Id. at 12-13.
122 The Board expressly permitted new contentions based on LRA Amendment 9 to be filed on or before September 15, 2010. See Licensing Board Order (Granting New Yorks Motion to Extend Deadline for Filing New Contentions) (Aug. 12, 2010) at 1 (unpublished). Because NYS-25 was filed within that time period and it challenges the AMP for RPV internals in Entergys that appear for the first time in LRA Amendment 9, we deem it timely pursuant to Section 2.309(f)(2).
E. New York Reply New York replies that the new bases it has submitted for NYS-25 are aimed solely at RPV internals, stresses that the new bases are within the scope of the previously-admitted contention, and clarifies that the new bases mention the RPV itself in order to reiterate "out of an abundance of caution" NYS-25's original complaint that Entergy's LRA still lacks a valid AMP for the RPV itself.
114  New York also argues that Entergy's reliance on MRP-227 is subject to challenge in this proceeding because that industry-produced document has not yet been endorsed by the NRC and further argues that even if MRP-227 would be endorsed by the NRC, Entergy's fulfillment of that document's suggestions would still be subject to challenge in this proceeding because it is only guidance and is not binding.
115  New York also claims that it has presented a genuine dispute of material fact over Entergy's ability to synergistically manage the effects of aging because Entergy has only claimed that it has several independent (as opposed to synergistic) programs that manage the effects of aging.
116  Regarding each of the three aging management programs in LRA Amendment 9 cited by the NRC Staff as meeti ng New York's concerns (namely, Inservice Inspection, Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel, and Water Chemistry Control-Primary and Secondary Program), New York asserts that


each of these, "by its terms, does not exam ine or evaluate the synergistic effects of embrittlement and fatigue leading to components failures and compromised core cooling during  
plan. We admitted NYS-25 based on that claim, finding that it met the requirements of 10 C.F.R. § 2.309(f)(1).123 Thereafter, Entergy submitted an amendment to its LRA which addressed claims that were within the scope of NYS-25. In response, New York filed this Motion, which claims that LRA Amendment 9 does not present an adequate AMP, and in support of this claim, New York offers the proffered new bases discussed herein.
In response, both Entergy and the NRC Staff argue that the specifics cited to by New York are not required by regulation but, in so doing, we believe they have missed the point. At issue is whether Entergy has presented an adequate AMP. The applicable regulation requires that the applicant [Entergy] shall demonstrate that . . . (iii) [t]he effects of aging on the intended function(s) will be adequately managed for the period of extended operation.124 The regulation does not specify exactly how this demonstration will be accomplished. It may well be that after a hearing we conclude that the alleged deficiencies are accurately described by New York but that, nevertheless, Entergys AMP is adequate. At this stage of the proceeding, however, we do not weigh the evidence.125 By granting New Yorks Motion, we agree that the allegations it has made flow from LRA Amendment 9, are within the scope of the contention as originally admitted, and support the existence of a genuine dispute regarding the adequacy of Entergys AMP relating to the potential embrittlement of RPV and related internals. After the hearing we will determine whether, considering all relevant factors including the new bases proffered by New York, Entergy has presented an adequate AMP. New Yorks Motion to add bases to NYS-25 is granted.
123 LBP-08-13, 68 NRC at 129-31.
124 10 C.F.R. § 54.21(c)(1).
125 See LBP-08-13, 68 NRC at 61-64 (explaining the licensing boards duties during contention admissibility).


a transient shock event . . . ."
V.       NYS-37 A.       Background and New York Motion NYS-37 states that:
117  In the same vein, New York posits that the Reactor Vessel 114  New York NYS-25 Reply at 4-5 & n.2.
The FSEIS discussion of energy alternatives (Chapter 8) fails to provide a meaningful analysis of energy alternatives or responses to criticism of the DSEIS, in violation of the requirements of 42 U.S.C. §§ 4331 and 4332; 10 C.F.R. §§ 51.91(A)(1), and (C), 51.92(2), 51.95(C)(4), and Part 51, Subpart A, Appendix A and Appendix B; 40 C.F.R. §§ 1052.1, 1052.2(G), 1502.9, and 1502.14; and 5 U.S.C. § 551 et seq.126 In addition to expressly incorporating New Yorks previously admitted bases from NYS-9/33, NYS-37 raises new claims that the FSEIS does not satisfy the NRCs NEPA obligations because it, inter alia, failed to (a) meaningfully consider significant new information material to non-fossil fuel alternatives; (b) failed to respond in the FSEIS to the States detailed criticism of the DSEIS; (c) failed to meaningfully analyze renewable sector generation, energy efficiency and conservation, purchased electrical power and combined heat and power; and (d) relied substantially on inaccurate information.127 Reviewing the previous contentions, we admitted NYS-9 inasmuch as it raised a genuine dispute over Entergys need to to consider energy conservation for the no-action alternative in its ER, but we found inadmissible those portions of NYS-9 that allege[d] ER deficiencies due to Entergys lack of considering energy conservation in its alternatives analysis for the defined goal of producing 2158 MWe of baseload generation.128 We later admitted NYS-33, which challenged specific portions of the DSEISs analysis addressing energy conservation and 126 State of New York Contention Concerning NRC Staffs Final Supplemental Environmental Impact Statement (Feb. 3, 2011) at 2 [hereinafter NYS-37].
115  Id. at 6-11 (citations omitted).
127 State of New Yorks Supplement to Motion for Leave to File New and Amended Contention 37 Concerning Chapter 8 of the December 3, 2010 Final Supplemental Environmental Impact Statement (Feb. 3, 2011) at 3 [hereinafter New York Supplemental Motion for Leave to File NYS-37].
116  Id. at 12-13.
128 LBP-08-13, 68 NRC at 93.
117  Id. at 13-14. We note that New York generally uses the same language in attacking the three programs cited by the NRC Staff. However, for Inservice Inspection, New York complains that "by its terms, it does examine or evaluate the synergistic effects of embrittlement and fatigue."  Id. at 14 (emphasis added). We assume that this passage, when read in the context      Head Penetration Inspection Program (cited favorably by the NRC Staff to address New York's concerns) "by its terms, it does not examine or evaluate the effect of a transient thermal shock" on control rod penetrations and seal welds.
118  Moreover, New York responds that because a reactor's control rods and seal welds are located within the RPV, even MRP-227 and the GALL Report recognize that they are RPV internals and, accordingly, New York argues that these components require aging management review.
119 As for its challenges to Entergy's proposed inspection techniques, New York insists that it need not bring expert opinions to support its position, given that MRP-227 and the NRC's own opinions elsewhere have questioned the viability of visual testing.
120  Finally, New York urges the Board to consider the new bases to NYS-25 as timely filed because they arise out of and criticize the adequacy of Entergy's AMP for RPV internals, which did not exist before July 2010.121 F. Board Decision We hereby grant New York's Motion for Leave to add additional bases to previously admitted NYS-25 without altering or amending the contention as written.
122 In its original petition to intervene, New York alleged that, with respect to the effects of aging due to embrittlement of RPVs and the associated internals, Entergy had no meaningful of New York's general complaint, intended to aver that the Inservice Inspection program does not wrestle with the synergistic effects of embrittlement and fatigue.
118  Id. at 14-15.
119  Id. at 15. 120  Id. at 15-17.
121  Id. at 17-18.
122  The Board expressly permitted new contentions based on LRA Amendment 9 to be filed on or before September 15, 2010. See Licensing Board Order (Granting New York's Motion to Extend Deadline for Filing New Contentions) (Aug. 12, 2010) at 1 (unpublished). Because NYS-25 was filed within that time period and it challenges the AMP for RPV internals in Entergy's that appear for the first time in LRA Amendment 9, we deem it timely pursuant to Section 2.309(f)(2).
plan. We admitted NYS-25 based on that claim, finding that it met the requirements of 10 C.F.R. § 2.309(f)(1).
123 Thereafter, Entergy submitted an amendment to its LRA which addressed claims that were within the scope of NYS-25. In response, New York filed this Motion, which claims that LRA Amendment 9 does not present an adequate AMP, and in support of this claim, New York offers the proffered new bases discussed herein. In response, both Entergy and the NRC Staff argue that the specifics cited to by New York are not required by regulation but, in so doing, we believe they have missed the point. At issue is whether Entergy has presented an adequate AMP. The applicable regulation requires that "the applicant [Entergy] shall demonstrate that . . . (iii) [t]he effects of aging on the intended function(s) will be adequately managed for the period of extended operation."
124  The regulation does not specify exactly how this demonstration will be accomplished. It may well be that after a hearing we conclude that the alleged deficiencies are accurately described by New York but that, nevertheless, Entergy's AMP is adequate. At this stage of the proceeding, however, we do not weigh the evidence.
125  By granting New York's Motion, we agree that the allegations it has made flow from LRA Amendment 9, are within the scope of the contention as originally admitted, and support the existence of a genuine dispute regarding the adequacy of Entergy's AMP relating to the potential embrittlement of RPV and related internals. After the hearing we will determine whether, considering all relevant factors including the new bases proffered by New York, Entergy has presented an adequate AMP. New York's Motion to add bases to NYS-25 is granted.
123  LBP-08-13, 68 NRC at 129-31.
124  10 C.F.R. § 54.21(c)(1).
125  See LBP-08-13, 68 NRC at 61-64 (explaining the licensing board's duties during contention admissibility).
V. NYS-37 A. Background and New York Motion NYS-37 states that: The FSEIS discussion of energy alternatives (Chapter 8) fails to provide a meaningful analysis of energy alternatives or responses to criticism of the DSEIS, in violation of the requirements of 42 U.S.C. §§ 4331 and 4332; 10 C.F.R. §§ 51.91(A)(1), and (C), 51.92(2), 51.95(C)(4), and Part 51, Subpart A, Appendix A and Appendix B; 40 C.F.R. §§ 1052.1, 1052.2(G), 1502.9, and 1502.14; and 5 U.S.C. § 551 et seq.
126 In addition to expressly incorporating New York's previously admitted bases from NYS-9/33, NYS-37 raises new claims that the FSEIS does not satisfy the NRC's NEPA obligations because it, inter alia , failed to (a) meaningfully consider significant new information material to non-fossil fuel alternatives; (b) failed to respond in the FSEIS to the State's detailed criticism of the DSEIS; (c) failed to meaningfully analyze renewable sector generation, energy efficiency and conservation, purchased electrical power and combined heat and power; and (d) relied substantially on inaccurate information.
127 Reviewing the previous contentions, we admitted NYS-9 inasmuch as it raised a genuine dispute over Entergy's need to "to consider energy conservation for the 'no-action' alternative in its ER," but we found inadmissible "those portions of NYS-9 that allege[d] ER deficiencies due to Entergy's lack of considering energy conservation in its alternatives analysis for the defined goal of producing 2158 MWe of baseload generation."
128 We later admitted NYS-33, which challenged specific portions of the DSEIS's analysis addressing "energy conservation and 126 State of New York Contention Concerning NRC Staff's Final Supplemental Environmental Impact Statement (Feb. 3, 2011) at 2 [hereinafter NYS-37].
127 State of New York's Supplement to Motion for Leave to File New and Amended Contention 37 Concerning Chapter 8 of the December 3, 2010 Final Supplemental Environmental Impact Statement (Feb. 3, 2011) at 3 [hereinafter New York Supplemental Motion for Leave to File NYS-37].
128 LBP-08-13, 68 NRC at 93.
efficiency, the viability of renewable energy resources, energy transmission capacity, and possible combinations of different energy sources" to fulfill the Staff's obligations regarding the no-action alternative. We consolidated NYS-33 with NYS-9.
129 Thereafter, on February 3, 2011, New York filed NYS-37, 130 followed by an unopposed Motion filed nunc pro tunc to extend the page limitations for NYS-37.
131  B. Entergy Answer Without waiving its arguments against the admission of NYS-9/33, Entergy does not oppose admission of NYS-37 to the extent it seeks to "update" or incorporate the underlying support for NYS-9/33.
132 129  June 16, 2009 Licensing Board Memorandum and Order at 9, 13.
130  See New York Supplemental Motion for Leave to File NYS-37; NYS-37. New York's submitted its Supplemental Motion for Leave to File NYS-37 on the same day the original Motion for Leave was filed. Compare New York Supplemental Motion for Leave to File NYS-37 with State of New York's Motion for Leave to File New and Amended Contentions Concerning Chapter 8 of the December 3, 2010 Final Supplemental Environmental Impact Statement (Feb.  


efficiency, the viability of renewable energy resources, energy transmission capacity, and possible combinations of different energy sources to fulfill the Staffs obligations regarding the no-action alternative. We consolidated NYS-33 with NYS-9.129 Thereafter, on February 3, 2011, New York filed NYS-37,130 followed by an unopposed Motion filed nunc pro tunc to extend the page limitations for NYS-37.131 B.      Entergy Answer Without waiving its arguments against the admission of NYS-9/33, Entergy does not oppose admission of NYS-37 to the extent it seeks to update or incorporate the underlying support for NYS-9/33.132 129 June 16, 2009 Licensing Board Memorandum and Order at 9, 13.
130 See New York Supplemental Motion for Leave to File NYS-37; NYS-37. New Yorks submitted its Supplemental Motion for Leave to File NYS-37 on the same day the original Motion for Leave was filed. Compare New York Supplemental Motion for Leave to File NYS-37 with State of New Yorks Motion for Leave to File New and Amended Contentions Concerning Chapter 8 of the December 3, 2010 Final Supplemental Environmental Impact Statement (Feb.
3, 2011).
3, 2011).
131 New York State Motion for Approval of Extension of Page Limitations for Proposed Contention 37, Nunc Pro Tunc, January 31, 2011 (Feb. 23, 2011); Supplemental Certification to the State of New York's Motion for Approval Of Extension Of Page Limitations For Proposed Contention 37, Nunc Pro Tunc, January 31, 2011 (Feb. 23, 2011). We grant New York's nunc pro tunc Motion to extend the page limitations because it is unopposed and we accept New York's reasonable interpretation of our Scheduling Order that motions themselves are bound by the twenty-five page limit but contentions themselves are not restricted in the same manner. Cf.
131 New York State Motion for Approval of Extension of Page Limitations for Proposed Contention 37, Nunc Pro Tunc, January 31, 2011 (Feb. 23, 2011); Supplemental Certification to the State of New Yorks Motion for Approval Of Extension Of Page Limitations For Proposed Contention 37, Nunc Pro Tunc, January 31, 2011 (Feb. 23, 2011). We grant New Yorks nunc pro tunc Motion to extend the page limitations because it is unopposed and we accept New Yorks reasonable interpretation of our Scheduling Order that motions themselves are bound by the twenty-five page limit but contentions themselves are not restricted in the same manner. Cf.
July 1, 2010 Scheduling Order at para. G.1.  
July 1, 2010 Scheduling Order at para. G.1.
On March 7, 2011, Entergy filed an Answer opposing admission of NYS-37 in part while the NRC Staff filed an Answer opposing admission of NYS-37 in its entirety. Applicants Answer to New York States Contention 37 Concerning the NRC Staffs Evaluation of Energy Alternatives (Mar. 7, 2011) [hereinafter Entergy Answer to NYS-37]; NRC Staffs Answer to the State of New Yorks Motion for Leave to File a New Contention, and New Contention 37, Concerning the Final Supplemental Environmental Impact Statement (Mar. 7, 2011) [hereinafter NRC Staff Answer to NYS-37]. On March 18, 2011, New York filed its Combined Reply to Entergys and the NRC Staffs Answers. State of New Yorks Combined Reply to Entergy and NRC Staffs Answers to the States Proposed Contention 37 Concerning NRC Staffs December 2010 Final Environmental Impact Statement and its Deficient Analysis of Energy Alternatives (Mar. 18, 2011) [hereinafter New York NYS-37 Reply].
132 Entergy Answer to NYS-37 at 2, 13.


On March 7, 2011, Entergy filed an Answer opposing admission of NYS-37 in part while the NRC Staff filed an Answer opposing admission of NYS-37 in its entirety. Applicant's Answer to New York State's Contention 37 Concerning the NRC Staff's Evaluation of Energy Alternatives (Mar. 7, 2011) [hereinafter Entergy Answer to NYS-37]; NRC Staff's Answer to the State of New York's Motion for Leave to File a New Contention, and New Contention 37, Concerning the Final Supplemental Environmental Impact Statement (Mar. 7, 2011) [hereinafter NRC Staff Answer to NYS-37]. On March 18, 2011, New York filed its Combined Reply to Entergy's and the NRC Staff's Answers. State of New York's Combined Reply to Entergy and NRC Staff's Answers to the State's Proposed Contention 37 Concerning NRC Staff's December 2010 Final Environmental Impact Statement and its Deficient Analysis of Energy Alternatives (Mar. 18, 2011) [hereinafter New York NYS-37 Reply].  
However, Entergy argues that the remainder of NYS-37 is inadmissible. Entergy portrays New Yorks positions that the FSEIS overestimates the need for power and that the FSEIS misrepresents the characteristics of the power sources essential to replacing power produced by Indian Point as outside the scope of this proceeding.133 According to Entergy, NYS-37 provides an invalid factual and legal basis for challenging the FSEISs discussion of non-fossil fuel alternatives to license renewal.134 Entergy also suggests that some of the documents relied on by New York and its experts either are speculative or undermine the likelihood that alternatives cited by New York could be adequate replacements for Indian Point.135 Similarly, Entergy stresses that, in its view, the FSEIS relies on reasonably up-to-date information, adequately takes into consideration the comments raised on the DSEIS, and has conducted the requisite thorough review of this issue.136 C.     NRC Staff Answer The NRC Staff opposes admission all of NYS-37 because, according to the NRC Staff, it is untimely and does not meet the NRCs contention admissibility standards. Regarding the timeliness standard for new and amended NEPA contentions under Section 2.309(f)(2), the NRC Staff represents that New York has not demonstrated how the information and conclusion in the FSEIS regarding the no-action alternative differ significantly from those described in the DSEIS.137 Moreover, relying on Prairie Island, the NRC Staff urges the Board to view as conclusory and inadequate New Yorks explanation for the timeliness of NYS-37 under the alternative timeliness factors of Section 2.309(f)(2)(i)-(iii), given that information in documents 133 Id. at 13-14.
134 Id. at 14-17.
135 Id. at 17-21.
136 Id. at 19-24.
137 NRC Staff Answer to NYS-37 at 8-10, 14-15, 19, 22-23.


132  Entergy Answer to NYS-37 at 2, 13.
relied on by New York is dated much earlier than the publication of the FSEIS.138 Conversely, because they were not attached to New Yorks pleadings, the NRC Staff claims that the Board may not consider other documents cited by New York that were dated after publication of the FSEIS.139 The NRC Staff also opposes the admission of NYS-37 by claiming that New York could have raised aspects of NYS-37 relating to renewable energy standards, energy efficiency/energy conservation, purchased power, transmission corridors, combined heat and power projects, and non-fossil fuel alternatives either when the information regarding these issues became available or subsequent to discussion of these issues in the ER and the DSEIS.140 Under the NRCs standards for admission of nontimely contentions (Section 2.309(c)), the NRC Staff insists that New York has not made the requisite showing of good cause and will have ample opportunity through NYS-9/33 to litigate those issues raised in NYS-37.141 Turning to the admissibility of NYS-37 under Section 2.309(f)(1), the NRC Staff classifies the contention and its supporting documents as focused on possible alternatives to license renewal rather than the no-action alternative which, the staff notes, the Board explicitly rejected as outside the scope of this proceeding, as well as immaterial to the NRCs licensing decision in this proceeding.142 Further, the NRC Staff represents that the documents cited by New York as unaddressed in the FSEIS were never attached to New Yorks comments on the DSEIS, and thus, the NRC Staff argues, it was not required to include any response to those documents in 138 Id. at 10-11 & n.22, 24.
However, Entergy argues that the remainder of NYS-37 is inadmissible. Entergy portrays New York's positions that the FSEIS overestimates the need for power and that the FSEIS misrepresents the characteristics of the power sources essential to replacing power produced by Indian Point as outside the scope of this proceeding.
139 Id. at 11-12 nn.23, 25.
133  According to Entergy, NYS-37 provides an invalid factual and legal basis for challenging the FSEIS's discussion of non-fossil fuel alternatives to license renewal.
140 Id. at 19-20, 22-25.
134  Entergy also suggests that some of the documents relied on by New York and its experts either are speculative or undermine the likelihood that alternatives cited by New York could be adequate replacements for Indian Point.135  Similarly, Entergy stresses that, in its view, the FSEIS relies on reasonably up-to-date information, adequately takes into consideration the comments raised on the DSEIS, and has conducted the requisite thorough review of this issue.
141 Id. at 12-13.
136  C. NRC Staff Answer The NRC Staff opposes admission all of NYS-37 because, according to the NRC Staff, it is untimely and does not meet the NRC's contention admissibility standards. Regarding the timeliness standard for new and amended NEPA contentions under Section 2.309(f)(2), the NRC Staff represents that New York has not demonstrated how the information and conclusion in the FSEIS regarding the no-action alternative differ significantly from those described in the
142 Id. at 13-16, 18-19.


DSEIS.137  Moreover, relying on Prairie Island, the NRC Staff urges the Board to view as conclusory and inadequate New York's explanation for the timeliness of NYS-37 under the alternative timeliness factors of Section 2.309(f)(2)(i)-(iii), given that information in documents 133  Id. at 13-14.
the FSEIS.143 Lastly, the NRC Staff asserts that New Yorks mischaracterization of information regarding land disturbance and repowered facilities shows that these claims lack basis.144 D.      New York Reply New York replies that its concerns in NYS-37 were timely filed because the documents relied on by New York are not the timeliness triggers or the bases for its contention. Instead, New York reasons that the NRC Staffs analysis and conclusions in the FSEIS, much of it appearing for the first time in the FSEIS, give rise to the contention.145 According to New York, NYS-37 is not a demand for a need-for-power analysis but rather an assertion that the no-action alternative itself is inadequately analyzed in the FSEIS because the analysis relies on faulty assumptions and information describing the New York energy markets.146 Moreover, New York posits that the claims embedded in NYS-37 are material to the NRCs licensing decision in this proceeding due to the relief New York would be entitled to if it prevails on the merits, namely, the denial of Entergys LRA or the rewriting of the FSEIS.147 Finally, New York represents that the documents it relies on have either been served on the NRC Staff in this adjudicatory proceeding or in the NEPA comment process, making the NRC Staff well aware of New Yorks position.148 B.      Board Decision We find that NYS-37 was timely filed and that portions of the contention are admissible.
134  Id. at 14-17.
143 Id. at 16-17.
135  Id. at 17-21.
144 Id. at 24.
136  Id. at 19-24.
145 New York NYS-37 Reply at 11-14.
137  NRC Staff Answer to NYS-37 at 8-10, 14-15, 19, 22-23.
146 Id. at 14-17.
relied on by New York is dated much earlier than the publication of the FSEIS.
147 Id. at 17-23.
138  Conversely, because they were not attached to New York's pleadings, the NRC Staff claims that the Board may not consider other documents cited by New York that were dated after publication of the FSEIS.139  The NRC Staff also opposes the admission of NYS-37 by claiming that New York could have raised aspects of NYS-37 relating to renewable energy standards, energy efficiency/energy conservation, purchased power, transmission corridors, combined heat and power projects, and non-fossil fuel alternatives either when the information regarding these issues became available or subsequent to discussion of these issues in the ER and the
148 Id. at 24.


DSEIS.140  Under the NRC's standards for admission of nontimely contentions (Section 2.309(c)), the NRC Staff insists that New York has not made the requisite showing of good cause and will have ample opportunity through NYS-9/33 to litigate those issues raised in NYS-37.141  Turning to the admissibility of NYS-37 under Section 2.309(f)(1), the NRC Staff classifies the contention and its supporting documents as focused on possible alternatives to license renewal rather than the no-action alternative which, the staff notes, the Board explicitly rejected as outside the scope of this proceeding, as well as immaterial to the NRC's licensing decision in this proceeding.
We agree with New York that the timelessness trigger for the filling of this contention was the publication of the FSEIS. At the heart of this contention is the claim that the NRC Staff relied on outdated information and ignored well-reasoned and supported comments to the DSEIS in conducting its analysis and in reaching conclusions relating to the no-action alternative that were articulated in the FSEIS. Accordingly, we hold that this contention could not have been filed prior to the publication of the FSEIS and, after its publication, the contention was timely filed, consistent with the provisions of this Boards July 1, 2010 Scheduling Order.
142  Further, the NRC Staff represents that the documents cited by New York as unaddressed in the FSEIS were never attached to New York's comments on the DSEIS, and
After consideration of the factors discussed in the parties pleadings, NYS-37 is admitted, in part, to the extent that it updates and supersedes NYS-9/33 and to the extent that it challenges the adequacy of the discussion in the FSEIS addressing comments made regarding the environmental impact of the no-action alternative as described in the DSEIS.
New York has alleged that the discussion of the no-action alternative in the FSEIS is, for all material purposes, identical to the discussion of the no-action alternative in the DSEIS,149 a proposition with which the NRC Staff appears to agree.150 But, in addition to the previously alleged deficiencies, New York now alleges, with new supporting declarations from David Schlissel,151 Peter Lanzalotta,152 and Peter Bradford,153 that the FSEIS is deficient for failing to discuss information, published after the DSEISs issuance in December 2008, that is material to understanding the environmental impact of the no-action alternative and also that it fails to adequately address comments made to the DSEIS.154 149 NYS-37 at 9.
150 NRC Staff Answer to NYS-37 at 8-10.
151 NYS-37, Attach. 4: Declaration of David A. Schlissel (Jan. 31, 2011).
152 Id., Attach. 5, Declaration of Peter J. Lanzalotta (Feb. 1, 2011).
153 Id., Attach. 6, Declaration of Peter A. Bradford (Feb. 2, 2011).
154 NYS-37 at 8-17.


thus, the NRC Staff argues, it was not required to include any response to those documents in 138  Id. at 10-11 & n.22, 24.
It is only these aspects of NYS-37 that we find admissible. In admitting this contention, we are not authorizing a broad-ranged inquiry into alternative scenarios and the need for power, which would be precluded by Commission regulations,155 and which we have previously excluded.156 Remembering that we are still at the contention admissibility stage, as opposed to the merits stage of this proceeding, we believe that New York has proffered sufficient information to establish the existence of a material dispute. Specifically, we have previously held and continue to hold that New York has raised a genuine issue regarding the adequacy of the evaluation of the environmental impact of the no-action alternative to the relicensing of IP2 and IP3. Our ruling here updates, but does not materially expand the scope of, this contention.
139  Id. at 11-12 nn.23, 25.
VI. RK-EC-3/CW-EC-1 In Riverkeeper, Inc.s (Riverkeepers) hearing request, Contention EC-3 (RK-EC-3),
140  Id. at 19-20, 22-25.
subtitled Failure to Adequately Analyze Impacts of Spent Fuel Pools, alleged that Entergys ER did not:
141  Id. at 12-13.
[S]atisfy the requirements of NEPA, 42 U.S.C. § 4332 et seq., and NRC regulations implementing NEPA, including 10 C.F.R. § 51.45(c) and (e).
142  Id. at 13-16, 18-19.
Because the ER does not adequately assess new and significant information regarding the environmental impacts of the radioactive water leaks from the Indian Point 1 and Indian Point 2 spent fuel pools on the groundwater and the Hudson River ecosystem.157 155 10 C.F.R. § 51.95(c)(2) (The supplemental environmental impact statement for license renewal is not required to include discussion of need for power or the economic costs and economic benefits of the proposed action or of alternatives to the proposed action except insofar as such benefits and costs are either essential for a determination regarding the inclusion of an alternative in the range of alternatives considered or relevant to mitigation.).
the FSEIS.
156 June 16, 2009 Licensing Board Order at 11-13; LBP-08-13, 68 NRC at 92-93. We find New Yorks concerns about the FSEISs analysis of certain non-fossil alternatives untimely, given that these issues go beyond those raised by New York in its contentions on the DSEIS and New York could have raised them earlier.
143  Lastly, the NRC Staff asserts that New York's mischaracterization of information regarding land disturbance and repowered facilities shows that these claims lack basis.
157 LBP-08-13, 68 NRC at 188.
144 D. New York Reply New York replies that its concerns in NYS-37 were timely filed because the documents relied on by New York are not the timeliness triggers or the bases for its contention. Instead, New York reasons that the NRC Staff's analysis and conclusions in the FSEIS, much of it appearing for the first time in the FSEIS, give rise to the contention.
145  According to New York, NYS-37 is not a demand for a need-for-power analysis but rather an assertion that the no-action alternative itself is inadequately analyzed in the FSEIS because the analysis relies on faulty assumptions and information describing the New York energy markets.
146  Moreover, New York posits that the claims embedded in NYS-37 are mate rial to the NRC's licensing decision in this proceeding due to the relief New York would be entitled to if it prevails on the merits, namely, the denial of Entergy's LRA or the rewriting of the FSEIS.
147  Finally, New York represents that the documents it relies on have either been se rved on the NRC Staff in this adjudicatory proceeding or in the NEPA comment process, making the NRC Staff well aware of New York's position.148  B. Board Decision We find that NYS-37 was timely filed and that portions of the contention are admissible.
143  Id. at 16-17.
144  Id. at 24. 145  New York NYS-37 Reply at 11-14.
146  Id. at 14-17.
147  Id. at 17-23.
148  Id. at 24.        We agree with New York that the timelessness trigger for the filling of this contention was the publication of the FSEIS. At the heart of this contention is the claim that the NRC Staff relied on outdated information and ignored well-reasoned and supported comments to the DSEIS in conducting its analysis and in reaching conclusions relating to the no-action alternative that were articulated in the FSEIS. Accordingly, we hold that this contention could not have been filed prior to the publication of the FSEIS and, after its publication, the contention was timely filed, consistent with the provisions of this Board's July 1, 2010 Scheduling Order. After consideration of the factors discussed in the parties' pleadings, NYS-37 is admitted, in part, to the extent that it updates and supersedes NYS-9/33 and to the extent that it challenges the adequacy of the discussion in the FSEIS addressing comments made regarding the environmental impact of the no-action alternative as described in the DSEIS. New York has alleged that the discussion of the no-action alternative in the FSEIS is, for all material purposes, identical to the discussion of the no-action alternative in the DSEIS, 149 a proposition with which the NRC Staff appears to agree.
150  But, in addition to the previously alleged deficiencies, New York now alleges, with new supporting declarations from David Schlissel, 151 Peter Lanzalotta, 152 and Peter Bradford, 153 that the FSEIS is deficient for failing to discuss information, published after the DSEIS's issuance in December 2008, that is material to understanding the environmental impact of the no-action alternative and also that it fails to adequately address comments made to the DSEIS.
154 149  NYS-37 at 9.
150  NRC Staff Answer to NYS-37 at 8-10.
151  NYS-37, Attach. 4: Declaration of David A. Schlissel (Jan. 31, 2011).
152  Id., Attach. 5, Declaration of Peter J. Lanzalotta (Feb. 1, 2011).
153  Id., Attach. 6, Declaration of Peter A. Bradford (Feb. 2, 2011).
154  NYS-37 at 8-17.
It is only these aspects of NYS-37 that we find admissible. In admitting this contention, we are not authorizing a broad-ranged inquiry into alternative scenarios and the need for power, which would be precluded by Commission regulations, 155 and which we have previously excluded.156 Remembering that we are still at the contention admissibility stage, as opposed to the merits stage of this proceeding, we believe that New York has proffered sufficient information to establish the existence of a material dispute. Specifically, we have previously held and continue to hold that New York has raised a genuine issue regarding the adequacy of the evaluation of the environmental impact of the no-action alternative to the relicensing of IP2 and IP3. Our ruling here updates, but does not materially expand the scope of, this contention. VI. RK-EC-3/CW-EC-1 In Riverkeeper, Inc.'s (Riverkeeper's) hearing request, Contention EC-3 (RK-EC-3),
subtitled "Failure to Adequately Analyze Impacts of Spent Fuel Pools," alleged that Entergy's ER did not: [S]atisfy the requirements of NEPA, 42 U.S.C. § 4332 et seq., and NRC regulations implementing NEPA, including 10 C.F.R. § 51.45(c) and (e). Because the ER does not adequately assess new and significant information regarding the environmental impacts of the radioactive water leaks from the Indian Point 1 and Indian Point 2 spent fuel pools on the groundwater and the Hudson River ecosystem.
157 155 10 C.F.R. § 51.95(c)(2) ("The supplemental environmental impact statement for license renewal is not required to include discussion of need for power or the economic costs and economic benefits of the proposed action or of alternatives to the proposed action except insofar as such benefits and costs are either essential for a determination regarding the inclusion of an alternative in the range of alternatives considered or relevant to mitigation.").
156 June 16, 2009 Licensing Board Order at 11-13; LBP-08-13, 68 NRC at 92-93. We find New York's concerns about the FSEIS's analysis of certain non-fossil alternatives untimely, given that these issues go beyond those raised by New York in its contentions on the DSEIS and New York could have raised them earlier.  


157  LBP-08-13, 68 NRC at 188.
In Hudson River Sloop Clearwater, Inc.s (Clearwaters) hearing request, Contention EC-1 (CW-EC-1) also asserted a Failure of [Entergys] ER to Adequately Address the Impacts of Known & Unknown Leaks.158 We admitted both of these contentions, and consolidated them as Riverkeeper EC-3 and Clearwater EC Spent Fuel Pool Leaks (RK-EC-3/CW-EC-1).159 On May 28, 2009, we permitted Riverkeeper and Clearwater to apply RK-EC-3/CW-EC-1 to the NRC Staffs analysis in the DSEIS.160 On February 3, 2011, Riverkeeper and Clearwater moved to apply RK-EC-3/CW-EC-1 to the FSEIS.161 Without waiving their objections to the merits or the original admissibility of the consolidated contention, Entergy and the NRC Staff do not oppose Riverkeepers and Clearwaters request.162 The Board hereby grants Clearwaters and Riverkeepers Motion. RK-EC-3/CW-EC-1 shall apply to Entergys ER, the NRC Staffs DSEIS, and the NRC Staffs FSEIS.
In Hudson River Sloop Clearwater, Inc.'s (Clearwater's) hearing request, Contention EC-1 (CW-EC-1) also asserted a "Failure of [Entergy's] ER to Adequately Address the Impacts of Known & Unknown Leaks."
VII. CW-RK WASTE CONFIDENCE RULE CONTENTIONS A.      Background On January 24, 2011, Clearwater and Riverkeeper jointly filed new contentions:
158 We admitted both of these contentions, and consolidated them as "Riverkeeper EC-3 and Clearwater EC Spent Fuel Pool Leaks" (RK-EC-3/CW-EC-1).
Clearwater EC-8/Riverkeeper EC-6 (CW-EC-8/RK-EC-6), Clearwater SC-2/Riverkeeper TC-3 158 Id. at 191.
159 On May 28, 2009, we permitted Riverkeeper and Clearwater to apply RK-EC-3/CW-EC-1 to the  
159 Id. at 190-91, 193-94, 220.
160 Licensing Board Order (Applying Consolidated Contention Riverkeeper EC-3/Clearwater EC-1 to the NRC Staffs Draft Supplemental Environmental Impact Statement) (May 28, 2009) at 1-2 (unpublished).
161 Riverkeeper, Inc. and Clearwater, Inc. Challenge to NRC Staffs Assessment of Impacts of Spent Fuel Pool Leaks in the Final Supplemental Environmental Impact Statement (Feb. 3, 2011) at 3.
162 Applicants Answer to Riverkeeper, Inc. and Hudson River Sloop Clearwater, Inc.s Filing Regarding Consolidated Contention Riverkeeper EC-3/Clearwater EC-1 (Mar. 7, 2011) at 2; NRC Staffs Answer to Riverkeeper, Inc. and Clearwater, Inc.s Challenge to NRC Staffs Assessment of Impacts of Spent Fuel Pool Leaks in the Final Supplemental Environmental Impact Statement (Mar. 7, 2011) at 2 & n.6.


NRC Staff's analysis in the DSEIS.
(CW-SC-2/RK-TC-3), Clearwater EC-9/Riverkeeper EC-7 (CW-EC-9/RK-EC-7), and Clearwater SC-3/Riverkeeper TC-4 (CW-SC-3/RK-TC-4).163 B.      Clearwater and Riverkeeper Joint Motion Clearwaters and Riverkeepers four joint contentions come in two groups, with each group containing one environmental contention and one safety contention: the first group presumes that the recent updates to the NRCs Waste Confidence Rule are invalid (CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3), while the second group is intended to apply in the event 163 Hudson River Sloop Clearwater, Inc. and Riverkeeper, Inc.s Joint Motion for Leave to Add New Contentions Based Upon New Information and Petition to Add New Contentions (Jan. 24, 2011) [hereinafter CW-RK Joint Contentions]. On February 10, 2011, New York filed an Answer supporting these new contentions. State of New York Answer in Support of the Admission of Clearwater and Riverkeepers Proposed Waste Confidence Contentions: Clearwater EC-8, SC-2, EC-9, SC-3, Riverkeeper EC-6, TC-3, EC-7, TC-4 (Feb. 10, 2011) [hereinafter New York Answer to CW-RK Joint Contentions]. On February 18, 2011, Entergy and the NRC Staff filed Answers opposing admission of Clearwaters and Riverkeepers joint new contentions.
160  On February 3, 2011, Riverkeeper and Clearwater moved to apply RK-EC-3/CW-EC-1 to  
Applicants Answer to Hudson River Sloop Clearwater, Inc. and Riverkeeper, Inc.s New Contentions Concerning the Waste Confidence Rule (Feb. 18, 2011) [hereinafter Entergy Answer to CW-RK Joint Contentions]; NRC Staffs Answer to Hudson River Sloop Clearwater, Inc. and Riverkeeper, Inc.s Joint Motion and Petition to Add New Contentions (Feb. 18, 2011)
[hereinafter NRC Staff Answer to CW-RK Joint Contentions]. On February 25, 2011, along with their Joint Combined Reply to Entergys and the NRC Staffs Answers, Clearwater and Riverkeeper filed a Petition for Exemption from or Waiver of Restrictions Contained in 10 C.F.R.
§ 51.23(b) (Exemption/Waiver Petition). Combined Reply to NRC Staff and Entergys Answers in Opposition to Clearwater and Riverkeepers Joint Motion for Leave and Petition to Add New Contentions (Feb. 25, 2011) [hereinafter CW-RK Joint Contentions Reply]; Hudson River Sloop Clearwater, Inc. and Riverkeeper, Inc.s Petition for Exemption from or Waiver of Restrictions Contained in 10 C.F.R. § 51.23 (Feb. 25, 2011) [hereinafter CW-RK Waiver/Exemption Petition].
On March 4, 2011, Entergy filed a Motion to Strike regarding Clearwaters and Riverkeepers Exemption/Waiver Petition, portions of Clearwaters and Riverkeepers Reply, and documents filed with Clearwaters and Riverkeepers Reply. Applicants Motion to Strike (Mar. 4, 2011) [hereinafter Entergy Motion to Strike]. The NRC Staff supports Entergys Motion to Strike, while Clearwater and Riverkeeper oppose Entergys Motion to Strike. NRC Staffs Answer to Applicants Motion to Strike Hudson River Sloop Clearwater, Inc. and Riverkeeper, Inc.s Petition for Waiver and Portions of their Combined Reply to Answers to their New Waste Confidence Contentions (Mar. 14, 2011) [hereinafter NRC Staff Answer to Entergy Motion to Strike]; Petitioners Opposition to Entergys Motion to Strike (Mar. 21, 2011) [hereinafter CW-RK Answer to Entergy Motion to Strike]. The Board granted Clearwater and Riverkeeper an extension of time within which to file their Answer responding to Entergys Motion to Strike. See Licensing Board Order (Granting New Yorks and Clearwaters/Riverkeepers Motions for Extensions of Time) (Mar. 11, 2011) at 2 (unpublished).


the FSEIS.
the Board finds the Waste Confidence Rule valid (CW-EC-9/RK-EC-7 and CW-SC-3/RK-TC-4).164 As for the first group of Waste Confidence Rule contentions from Clearwater and Riverkeeper (those presuming the Rule is invalid), the environmental contention CW-EC-8/RK-EC-6 alleges:
161  Without waiving their objections to the merits or the original admissibility of the consolidated contention, Entergy and the NRC Staff do not oppose Riverkeeper's and Clearwater's request.
The environmental analysis carried out to assess the potential impacts of relicensing Indian Point Units 2 and 3 is inadequate because it provides an insufficient analysis of the potential impacts of generating more spent fuel leading to additional waste storage on site, the alternative methods of accomplishing such storage, and potential alternatives to additional waste storage on the site, including the no-action alternative.165 The safety contention, CW-SC-2/RK-TC-3 alleges:
162    The Board hereby grants Clearwater's and Riverkeeper's Motion. RK-EC-3/CW-EC-1 shall apply to Entergy's ER, the NRC Staff's DSEIS, and the NRC Staff's FSEIS.
The license renewal application requesting the relicensing of Indian Point Units 2 and 3 is inadequate because it provides insufficient analysis of the aging management of the dry casks and spent fuel pools that could be used to store waste on the site in the long term. In addition, both the application and the NRC Staff have failed to establish that any combination of such storage will provide adequate protection of safety over the long term.166 In the event that the Board finds the Waste Confidence Rule valid, CW-EC-9/RK-EC-7 asserts as an environmental contention that:
VII. CW-RK WASTE CONFIDENCE RULE CONTENTIONS A. Background On January 24, 2011, Clearwater and Riverkeeper jointly filed new contentions: Clearwater EC-8/Riverkeeper EC-6 (CW-EC-8/RK-EC-6), Clearwater SC-2/Riverkeeper TC-3 158  Id. at 191. 159  Id. at 190-91, 193-94, 220.
The environmental analysis carried out to assess the potential impacts of relicensing Indian Point Units 2 and 3 is inadequate because it provides an insufficient analysis of the potential impacts of generating more spent fuel during the period commencing 60 years after the expiration of each license. Missing elements include analysis of: a) the long term impact of additional waste storage on site; b) the alternative methods of accomplishing such storage; and c) potential alternatives to additional waste storage on the site, including the no-action alternative.167 As a safety contention, CW-SC-3/RK-TC-4 asserts:
160  Licensing Board Order (Applying Consolidated Contention Riverkeeper EC-3/Clearwater EC-1 to the NRC Staff's Draft Supplemental Environmental Impact Statement) (May 28, 2009) at 1-2 (unpublished).
164 CW-RK Joint Contentions at 17.
161  Riverkeeper, Inc. and Clearwater, Inc. Challenge to NRC Staff's Assessment of Impacts of Spent Fuel Pool Leaks in the Final Supplemental Environmental Impact Statement (Feb. 3, 2011) at 3.  
165 Id.
166 Id. at 18.
167 Id.


162  Applicant's Answer to Riverkeeper, Inc. and Hudson River Sloop Clearwater, Inc.'s Filing Regarding Consolidated Contention Riverkeeper EC-3/Clearwater EC-1 (Mar. 7, 2011) at 2; NRC Staff's Answer to Riverkeeper, Inc. and Clearwater, Inc.'s "Challenge to NRC Staff's Assessment of Impacts of Spent Fuel Pool Leaks in the Final Supplemental Environmental Impact Statement" (Mar. 7, 2011) at 2 & n.6.      (CW-SC-2/RK-TC-3), Clearwater EC-9/Riverkeeper EC-7 (CW-EC-9/RK-EC-7), and Clearwater SC-3/Riverkeeper TC-4 (CW-SC-3/RK-TC-4).
The license renewal application requesting the relicensing of Indian Point Units 2 and 3 is inadequate because it provides insufficient analysis of the aging management of the dry casks and spent fuel pools that could be used to store waste on the site during the period commencing 60 years after the date the license expires at each unit. In addition, both the applicant and the NRC Staff have failed to establish that any combination of such storage will provide adequate protection of safety over the long term.168 Entergy and NRC Staff express numerous reasons for opposing the admission of Clearwaters and Riverkeepers joint contentions relating to the on-site storage of spent fuel. As threshold matters, both parties argue that the safety contentions (i.e., CW-SC-2 /RK-TC-3 and CW-SC-3/RK-TC-4) were not timely filed, that these contentions challenge NRC regulations, and that portions of Clearwaters and Riverkeepers Reply, which includes a waiver petition/exemption request, should be stricken from the record.169 For reasons discussed below, we find that the contentions were timely and that Entergys Motion to Strike portions of the Intervenors Reply should be denied. Nevertheless, none of these new contentions filed jointly by Clearwater and Riverkeeper is admissible because they are, inter alia, direct challenges to the agencys regulations.
163  B. Clearwater and Riverkeeper Joint Motion Clearwater's and Riverkeeper's four joint contentions come in two groups, with each group containing one environmental contention and one safety contention: the first group presumes that the recent updates to the NRC's Waste Confidence Rule are "invalid" (CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3), while the second group is intended to apply in the event 163  Hudson River Sloop Clearwater, Inc. and Riverkeeper, Inc.'s Joint Motion for Leave to Add New Contentions Based Upon New Information and Petition to Add New Contentions (Jan. 24, 2011) [hereinafter CW-RK Joint Contentions]. On February 10, 2011, New York filed an Answer supporting these new contentions. State of New York Answer in Support of the Admission of Clearwater and Riverkeeper's Proposed Waste Confidence Contentions: Clearwater EC-8, SC-2, EC-9, SC-3, Riverkeeper EC-6, TC-3, EC-7, TC-4 (Feb. 10, 2011) [hereinafter New York Answer to CW-RK Joint Contentions]. On February 18, 2011, Entergy and the NRC Staff filed Answers opposing admission of Clearwater's and Riverkeeper's joint new contentions.
Following a discussion of timeliness and Entergys Motion to Strike, the admissibility of these contentions is reviewed starting with CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3, followed by CW-EC-9/RK-EC-7 and CW-SC-3/RK-TC-4.
Applicant's Answer to Hudson River Sloop Clearwater, Inc. and Riverkeeper, Inc.'s New Contentions Concerning the Waste Confidence Rule (Feb. 18, 2011) [hereinafter Entergy Answer to CW-RK Joint Contentions]; NRC Staff's Answer to Hudson River Sloop Clearwater, Inc. and Riverkeeper, Inc.'s Joint Motion and Petition to Add New Contentions (Feb. 18, 2011) [hereinafter NRC Staff Answer to CW-RK Joint Contentions]. On February 25, 2011, along with their Joint Combined Reply to Entergy's and the NRC Staff's Answers, Clearwater and Riverkeeper filed a Petition for Exemption from or Waiver of Restrictions Contained in 10 C.F.R.  
: 1.      Timeliness Timeliness is a threshold that must be cleared for any proffered new or amended contention.170 Clearwaters and Riverkeepers joint contentions  based on the impact of the Commissions recent update to its Waste Confidence Decision (WCD Update)171  were filed 168 Id.
§ 51.23(b) (Exemption/Waiver Petition). Combined Reply to NRC Staff and Entergy's Answers in Opposition to Clearwater and Riverkeeper's Joint Motion for Leave and Petition to Add New Contentions (Feb. 25, 2011) [hereinafter CW-RK Joint Contentions Reply]; Hudson River Sloop Clearwater, Inc. and Riverkeeper, Inc.'s Petition for Exemption from or Waiver of Restrictions Contained in 10 C.F.R. § 51.23 (Feb. 25, 2011) [hereinafter CW-RK Waiver/Exemption Petition].  
169 See generally NRC Staff Answer to Entergy Motion to Strike; Entergy Motion to Strike; Entergy Answer to CW-RK Joint Contentions at 12-26; NRC Staff Answer to CW-RK Joint Contentions at 19-35.
170 See 10 C.F.R. § 2.309(c)(1), (f)(2); July 1, 2010 Scheduling Order at para. F.2.


On March 4, 2011, Entergy filed a Motion to Strike regarding Clearwater's and Riverkeeper's Exemption/Waiver Petition, portions of Clearwater's and Riverkeeper's Reply, and documents filed with Clearwater's and Riverkeeper's Reply. Applicant's Motion to Strike (Mar. 4, 2011) [hereinafter Entergy Motion to Strike]. The NRC Staff supports Entergy's Motion to Strike, while Clearwater and Riverkeeper oppose Entergy's Motion to Strike. NRC Staff's Answer to Applicant's Motion to Strike Hudson River Sloop Clearwater, Inc. and Riverkeeper, Inc.'s Petition for Waiver and Portions of their Combined Reply to Answers to their New Waste Confidence Contentions (Mar. 14, 2011) [hereinafter NRC Staff Answer to Entergy Motion to Strike]; Petitioners' Opposition to Entergy's Motion to Strike (Mar. 21, 2011) [hereinafter CW-RK Answer to Entergy Motion to Strike]. The Board granted Clearwater and Riverkeeper an extension of time within which to file their Answer responding to Entergy's Motion to Strike. See Licensing Board Order (Granting New York's and Clearwater's/Riverkeeper's Motions for Extensions of Time) (Mar. 11, 2011) at 2 (unpublished).
on January 24, 2011, which is within thirty days after the publication date of the Commissions final WCD Update on December 23, 2010. In this updated Rule, the Commission addressed both the safety and environmental aspects of spent fuel storage in making a generic determination that, if necessary, spent fuel generated in any reactor can be stored safely and without significant environmental impacts for at least 60 years beyond the licensed life for operation.172 Contrary to both Entergys and the NRC Staffs position that the safety contentions (i.e., CW-SC-2/RK-TC-3 and CW-SC-3/RK-TC-4) are untimely,173 the contentions addressing the WCD Update meet the thirty day deadline in our July 1, 2010 Scheduling Order,174 they were filed within thirty days of the publication of the WCD Update, and are therefore timely inasmuch as they have arisen from information in the WCD Update.
the Board finds the Waste Confidence Rule valid (CW-EC-9/RK-EC-7 and CW-SC-3/RK-TC-4).164  As for the first group of Waste Confidence Rule contentions from Clearwater and Riverkeeper (those presuming the Rule is invalid), the environmental contention CW-EC-8/RK-
: 2.     Entergy Motion to Strike Portions of Clearwaters and /Riverkeepers Reply Entergy has moved first to strike all of the Gundersen and Greene Declarations and Waiver Petition/Exemption Request that Clearwater and Riverkeeper attached to their Reply to Entergys and NRC Staffs Answers to their Joint Contentions, as well as other portions of their Reply dealing with selected safety issues of spent fuel storage addressed in CW-SC-2/RK-TC-3 and CW-SC-3/RK-TC-4.175 The NRC Staff supports Entergys Motion.176 Entergy alleges that Clearwaters and Riverkeepers Reply and Gundersen Declarations (that present technical disputes with the Entergys aging management of spent fuel storage are new arguments and an 171 Consideration of Environmental Impacts of Temporary Storage of Spent Fuel After Cessation of Reactor Operation, 75 Fed. Reg. 81,032 (Dec. 23, 2010).
172 Id. at 81,036; see also 10 C.F.R. § 51.23(a).
173 Entergy Answer to CW-RK Joint Contentions at 3, 16-18, 23; NRC Staff Answer to CW-RK Joint Contentions at 19-20, 32-35.
174 July 1, 2010 Scheduling Order at para. F.2.
175 Entergy Motion to Strike at 6-10.
176 See NRC Staff Answer to Entergy Motion to Strike at 7.


EC-6 alleges: The environmental analysis carried out to assess the potential impacts of relicensing Indian Point Units 2 and 3 is inadequate because it provides an insufficient analysis of the potential impacts of generating more spent fuel leading to additional waste storage on site, the alternative methods of accomplishing such storage, and potential alternatives to additional waste storage on the site, including the no-action alternative.
impermissible attempt to cure the deficiencies in Petitioners safety contentions.177 On the opposite end of the spectrum, the Intervenors maintain that it is appropriate for them to amplify issues presented in the original contention without qualification.178 The purpose of a reply is to allow a petitioner to respond to an opposing partys legal and factual arguments raised in its answer to proposed contentions. A reply cannot be used to expand the scope of the contention, but instead must focus narrowly on the legal or factual arguments first presented in the original petition or raised in the answers to it.179 Statements acceptable for replies must meet two criteria: (1) they must be within the scope of the contention as originally filed, and (2) they must address factual or legal statements raised in the opposing parties answers. However, in its Motion to Strike, Entergy, supported by NRC Staff, seeks to broaden the criteria to include a prohibition against all new arguments.180 Entergy does note that, because it is not allowed to respond to a reply, principles of fairness mandate that a petitioner restrict its reply brief to addressing issues raised by the Applicants or the NRC Staffs Answers.181 While this point is valid, it falls well short of prohibiting a petitioner from raising all new arguments. As long as new statements are within the scope of the initial contention and directly flow from and are focused on the issues and arguments raised in the Answers, fairness is achieved through the consideration of these newly expressed arguments.
165  The safety contention, CW-SC-2/RK-TC-3 alleges: The license renewal application requesting the relicensing of Indian Point Units 2 and 3 is inadequate because it provides insufficient analysis of the aging management of the dry casks and spent fuel pools that could be used to store waste on the site in the long term. In addition, both the application and the NRC Staff have failed to establish that any combination of such storage will provide adequate protection of safety over the long term.
In this instance, Entergy argues that portions of Intervenors Reply contains new arguments and relies on new factual information, including the Gundersen Declaration, that was not submitted with the New Contentions, and that for the first time, reference and attempt to raise technical disputes with certain portions of Entergys aging management program for the 177 Entergy Motion to Strike at 7.
166 In the event that the Board finds the Waste Confidence Rule valid, CW-EC-9/RK-EC-7 asserts as an environmental contention that: The environmental analysis carried out to assess the potential impacts of relicensing Indian Point Units 2 and 3 is inadequate because it provides an insufficient analysis of the potential impacts of generating more spent fuel during the period commencing 60 years after the expiration of each license. Missing elements include analysis of: a) the long term impact of additional waste storage on site; b) the alternative methods of accomplishing such storage; and c) potential alternatives to additional waste storage on the site, including the no-action alternative.
178 CW-RK Answer to Entergy Motion to Strike at 4-5.
167  As a safety contention, CW-SC-3/RK-TC-4 asserts:
179 Nuclear Mgmt. Co., LLC (Palisades Nuclear Plant), CLI-06-17, 63 NRC 727, 732 (2006).
164  CW-RK Joint Contentions at 17.
180 See Entergy Motion to Strike at 5; NRC Staff Answer to Entergy Motion to Strike at 4.
165  Id. 166  Id. at 18. 167  Id.      The license renewal application requesting the relicensing of Indian Point Units 2 and 3 is inadequate because it provides insufficient analysis of the aging management of the dry casks and spent fuel pools that could be used to store waste on the site during the period commencing 60 years after the date the license expires at each unit. In addition, both the applicant and the NRC Staff have failed to establish that any combination of such storage will provide adequate protection of safety over the long term.
181 Entergy Motion to Strike at 5.
168 Entergy and NRC Staff express numerous reasons for opposing the admission of Clearwater's and Riverkeeper's joint contentions relating to the on-site storage of spent fuel. As threshold matters, both parties argue that the safety contentions (i.e., CW-SC-2 /RK-TC-3 and CW-SC-3/RK-TC-4) were not timely filed, that these contentions challenge NRC regulations, and that portions of Clearwater's and Riverkeeper's Reply, which includes a waiver petition/exemption request, should be stricken from the record.
169  For reasons discussed below, we find that the contentions were timely and that Entergy's Motion to Strike portions of the Intervenors' Reply should be denied. Nevertheless, none of these new contentions filed jointly by Clearwater and Riverkeeper is admissible because they are, inter alia, direct challenges to the agency's regulations. Following a discussion of timeliness and Entergy's Motion to Strike, the admissibility of these contentions is reviewed starting with CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3, followed by CW-EC-9/RK-EC-7 and CW-SC-3/RK-TC-4.
: 1. Timeliness Timeliness is a threshold that must be cleared for any proffered new or amended contention.
170  Clearwater's and Riverkeeper's joint contentions - based on the impact of the Commission's recent update to its Waste Confidence Decision (WCD Update) 171 - were filed 168  Id. 169  See generally NRC Staff Answer to Entergy Motion to Strike; Entergy Motion to Strike; Entergy Answer to CW-RK Joint Contentions at 12-26; NRC Staff Answer to CW-RK Joint Contentions at 19-35.
170  See 10 C.F.R. § 2.309(c)(1), (f)(2); July 1, 2010 Scheduling Order at para. F.2.
on January 24, 2011, which is within thirty days after the publication date of the Commission's final WCD Update on December 23, 2010. In this updated Rule, the Commission addressed both the safety and environmental aspects of spent fuel storage in making "a generic determination that, if necessary, spent fuel generated in any reactor can be stored safely and without significant environmental impacts for at least 60 years beyond the licensed life for operation."
172  Contrary to both Entergy's and the NRC Staff's position that the safety contentions (i.e., CW-SC-2/RK-TC-3 and CW-SC-3/RK-TC-4) are untimely, 173 the contentions addressing the WCD Update meet the thirty day deadline in our July 1, 2010 Scheduling Order, 174 they were filed within thirty days of the publication of the WCD Update, and are therefore timely inasmuch as they have arisen from information in the WCD Update.      2. Entergy Motion to Strike Portions of Clearwater's and /Riverkeeper's Reply Entergy has moved first to strike all of the Gundersen and Greene Declarations and Waiver Petition/Exemption Request that Clearwater and Riverkeeper attached to their Reply to Entergy's and NRC Staff's Answers to their Joint Contentions, as well as other portions of their Reply dealing with selected safety issues of spent fuel storage addressed in CW-SC-2/RK-TC-3 and CW-SC-3/RK-TC-4.
175  The NRC Staff supports Entergy's Motion.
176  Entergy alleges that Clearwater's and Riverkeeper's Reply and Gundersen Declarations (that present technical disputes with the Entergy's aging management of spent fuel storage are new arguments and an 171  Consideration of Environmental Impacts of Temporary Storage of Spent Fuel After Cessation of Reactor Operation, 75 Fed. Reg. 81,032 (Dec. 23, 2010).
172  Id. at 81,036; see also 10 C.F.R. § 51.23(a).
173  Entergy Answer to CW-RK Joint Contentions at 3, 16-18, 23; NRC Staff Answer to CW-RK Joint Contentions at 19-20, 32-35.  


174  July 1, 2010 Scheduling Order at para. F.2.
Indian Point spent fuel pools.182 Entergy goes on to challenge Intervenors citation of NRC Information Notice 2009-26 with the position that this document was new information that was first referenced in the Intervenors Reply.183 Neither Entergy nor NRC Staff has provided any support showing that the Intervenors statements are not within the scope of the original contention or that the information does not address issues raised in Entergys and the NRC Staffs Answers. While the arguments relating to the safety contention in Clearwaters and Riverkeepers Reply are more focused than in their original contention, they are consistent with the statement of the contention and acceptable as counterpoint to the Answers provided by Entergy and the NRC Staff.184 Specifically, the original contention addresses the adequacy of aging management of the dry casks and spent fuel pools,185 allegations that were challenged by the Applicant and NRC Staff in their Answers.186 Therefore, Energys Motion to Strike these portions of the Petitioners Reply is denied.187 Second, Entergy, supported by NRC Staff, also moves to strike Clearwaters and Riverkeepers Motion for exemption to, or waiver from, the rules as applied to the Intervenors position that the updated Waste Confidence Rule is invalid (as expressed in CW-EC-8/RK-EC-6 182 Id. at 6.
175  Entergy Motion to Strike at 6-10.
183 Id. at 6-7.
176  See NRC Staff Answer to Entergy Motion to Strike at 7.
184 We note that this case is distinguishable from such cases as Duke Energy Corp. (McGuire Nuclear Station, Units 1 and 2; Catawba Nuclear Station, Units 1 and 2), CLI-03-17, 58 NRC 419, 428-29 (2003) (internal citations omitted), where the intervenors attempted to add new bases or new issues that simply did not occur to [them] at the outset. See also Louisiana Energy Serv., L.P. (National Enrichment Facility), CLI-04-25, 60 NRC 223, 224-25 (2004)
      "impermissible attempt to cure the deficiencies in Petitioners' safety contentions."
(rejecting attempt to raise new claims for the first time in reply brief).
177  On the opposite end of the spectrum, the Intervenors maintain that it is appropriate for them to "amplify" issues presented in the original contention without qualification.
185 See CW-RK Joint Contentions at 18.
178  The purpose of a reply is to allow a petitioner to respond to an opposing party's legal and factual arguments raised in its answer to proposed contentions. A reply cannot be used to expand the scope of the contention, but instead "must focus narrowly on the legal or factual arguments first presented in the original petition or raised in the answers to it."
186 Entergy Answer to CW-RK Joint Contentions at 16-26; NRC Staff Answer to CW-RK Joint Contentions at 28-35.
179 Statements acceptable for replies must meet two criteria:  (1) they must be within the scope of the contention as originally filed, and (2) they must address factual or legal statements raised in the opposing parties' answers. However, in its Motion to Strike, Entergy, supported by NRC Staff, seeks to broaden the criteria to include a prohibition against all new arguments.
187 Allegations by Entergy and NRC Staff that the Intervenors failed to address the criteria in 10 C.F.R. § 2.309(c)(1) and (f)(2) are irrelevant because statements in the Intervenors Reply do relate to the opposing parties Answers and are therefore neither new nor untimely filed.
180  Entergy does note that, because it is not allowed to respond to a reply, "principles of fairness mandate that a petitioner restrict its reply brief to addressing issues raised by the Applicant's or the NRC Staff's Answers."
181  While this point is valid, it falls well short of prohibiting a petitioner from raising all new arguments. As long as new statements are within the scope of the initial contention and directly flow from and are focused on the issues and arguments raised in the Answers, fairness is achieved through the consideration of these newly expressed arguments. In this instance, Entergy argues that portions of Intervenors' Reply "contains new arguments and relies on new factual information, including the Gundersen Declaration, that was not submitted with the New Contentions," and that "for the first time, reference and attempt to raise technical disputes with certain portions of Entergy's aging management program for the 177  Entergy Motion to Strike at 7.
178  CW-RK Answer to Entergy Motion to Strike at 4-5.
179  Nuclear Mgmt. Co., LLC (Palisades Nuclear Plant), CLI-06-17, 63 NRC 727, 732 (2006).
180  See Entergy Motion to Strike at 5; NRC Staff Answer to Entergy Motion to Strike at 4.
181  Entergy Motion to Strike at 5.      Indian Point spent fuel pools."
182 Entergy goes on to challenge Intervenors' citation of NRC Information Notice 2009-26 with the position that this document was new information that was first referenced in the Intervenors' Reply.
183   Neither Entergy nor NRC Staff has provided any support showing that the Intervenors' statements are not within the scope of the original contention or that the information does not address issues raised in Entergy's and the NRC Sta ff's Answers. While the arguments relating to the safety contention in Clearwater's and Riverkeeper's Reply are more focused than in their original contention, they are consistent with the statement of the contention and acceptable as counterpoint to the Answers provided by Entergy and the NRC Staff.
184 Specifically, the original contention addresses the adequacy of aging management of the dry casks and spent fuel pools, 185 allegations that were challenged by the Applicant and NRC Staff in their Answers.
186 Therefore, Energy's Motion to Strike these portions of the Petitioner's Reply is denied.
187   Second, Entergy, supported by NRC Staff, also moves to strike Clearwater's and Riverkeeper's Motion for exemption to, or waiver from, the rules as applied to the Intervenors' position that the updated Waste Confidence Rule is invalid (as expressed in CW-EC-8/RK-EC-6 182 Id. at 6. 183 Id. at 6-7. 184 We note that this case is distinguishable from such cases as Duke Energy Corp. (McGuire Nuclear Station, Units 1 and 2; Catawba Nuclear Station, Units 1 and 2), CLI-03-17, 58 NRC 419, 428-29 (2003) (internal citations omitted), where the intervenors attempted to add new bases or new issues that "'simply did not occur to [them] at the outset.'"  See also Louisiana Energy Serv., L.P. (National Enrichment Facility), CLI-04-25, 60 NRC 223, 224-25 (2004) (rejecting attempt to raise new claims for the first time in reply brief).
185 See CW-RK Joint Contentions at 18.
186 Entergy Answer to CW-RK Joint Contentions at 16-26; NRC Staff Answer to CW-RK Joint Contentions at 28-35.  


187  Allegations by Entergy and NRC Staff that the Intervenors failed to address the criteria in 10 C.F.R. § 2.309(c)(1) and (f)(2) are irrelevant because statements in the Intervenors' Reply do relate to the opposing parties' Answers and are therefore neither new nor untimely filed.      and CW-SC-2/RK-TC-3), including the supporting Declarations of Greene and Gundersen.
and CW-SC-2/RK-TC-3), including the supporting Declarations of Greene and Gundersen.188 Clearly, the Intervenors are raising a new strategy in their Reply that was not part of these original contentions and that does not respond to issues raised in Entergys or the NRC Staffs Answers.189 The merits of this Motion for exemption and waiver and the attached declarations are discussed as an independent Motion in the following section.
188 Clearly, the Intervenors are raising a new strategy in their Reply that was not part of these original contentions and that does not respond to issues raised in Entergy's or the NRC Staff's Answers.189 The merits of this Motion for exemption and waiver and the attached declarations are discussed as an independent Motion in the following section. C. CW-EC-8/RK-EC-6 and CW-SC-2/RK TC-3 Admissibility and Exemption/Waiver Request Denial In Clearwater's and Riverkeeper's CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3, they have effectively repeated the same arguments that Clearwater advanced in its earlier petition for EC-7 and SC-1 relating to inadequacies in the Indian Point environmental analysis and aging management review for long-term spent fuel storage based, in part, on Commission action on its draft WCD Update.
C.     CW-EC-8/RK-EC-6 and CW-SC-2/RK TC-3 Admissibility and Exemption/Waiver Request Denial In Clearwaters and Riverkeepers CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3, they have effectively repeated the same arguments that Clearwater advanced in its earlier petition for EC-7 and SC-1 relating to inadequacies in the Indian Point environmental analysis and aging management review for long-term spent fuel storage based, in part, on Commission action on its draft WCD Update.190 Here, they are referring to the same inadequacies due to the invalidity of the final WCD Updates sidestepping of the statutory mandate of NEPA.191 As a result of its review of Clearwaters previous petition for EC-7 and SC-1, this Board certified the question to the Commission as to whether the Waste Confidence Rule remain[ed]
190 Here, they are referring to the same inadequacies due to the invalidity of the final WCD Update's sidestepping of the statutory mandate of NEPA.
viable despite the Administrations decision to abandon Yucca Mountain.192 In its response to our certification, the Commission emphasized that, in regard to onsite storage of spent fuel, it has chosen to proceed generically through the rulemaking process - that is, the Waste 188 Entergy Motion to Strike at 8-10; NRC Staff Answer to Entergy Motion to Strike at 5-6.
191   As a result of its review of Clearwater's previous petition for EC-7 and SC-1, this Board certified the question to the Commission as to "whether the Waste Confidence Rule remain[ed]
189 While referencing this Motion in their Reply and filing it at the same time as their Reply to Entergys and the NRC Staffs Answers, Clearwater and Riverkeeper submitted this request as a separate filing. See CW-RK Waiver/Exemption Petition.
viable despite the Administration's decision to abandon Yucca Mountain."
190 Hudson River Sloop Clearwater, Inc.s Motion for Leave to Add a New Contention Based Upon New Information (Oct. 26, 2009); see also CLI-10-19, 72 NRC __, __ (slip op.) (July 8, 2010); Licensing Board Memorandum and Order (Certification to the Commission of a Question Relating to the Continued Viability of 10 C.F.R. § 51.23(b) Arising From Clearwaters Motion for Leave to Admit New Contentions) (Feb. 12, 2010) (unpublished) [hereinafter Licensing Board Certification Memorandum and Order].
192 In its response to our certification, the Commission emphasized that, in regard to onsite storage of spent fuel, it  
191 CW-RK Joint Contentions at 17-18.
"'has chosen to proceed generically' through the rulemaking process - that is, the Waste 188 Entergy Motion to Strike at 8-10; NRC Staff Answer to Entergy Motion to Strike at 5-6.
192 Licensing Board Certification Memorandum and Order at 26.
189 While referencing this Motion in their Reply and filing it at the same time as their Reply to Entergy's and the NRC Staff's Answers, Clearwater and Riverkeeper submitted this request as a separate filing. See CW-RK Waiver/Exemption Petition.
190 Hudson River Sloop Clearwater, Inc.'s Motion for Leave to Add a New Contention Based Upon New Information (Oct. 26, 2009); see also CLI-10-19, 72 NRC __, __ (slip op.) (July 8, 2010); Licensing Board Memorandum and Order (Certification to the Commission of a Question Relating to the Continued Viability of 10 C.F.R. § 51.23(b) Arising From Clearwater's Motion for Leave to Admit New Contentions) (Feb. 12, 2010) (unpublished) [hereinafter Licensing Board Certification Memorandum and Order].  


191  CW-RK Joint Contentions at 17-18.
Confidence Rule, codified at 10 C.F.R. § 51.23 - instead of litigating issues case-by-case in adjudicatory proceedings.193 As we have previously noted, it has been the clear guidance . . .
192  Licensing Board Certification Memorandum and Order at 26.      Confidence Rule, codified at 10 C.F.R. § 51.23 - instead of litigating issues case-by-case in adjudicatory proceedings."
[from the Commission] that challenges to the Waste Confidence Rule must be made in the context of a rulemaking, not in the context of an adjudicative proceeding.194 The Commission also reiterated its position that: (1) it would not be productive and would be contrary to longstanding policy to litigate the impacts of on-site storage of spent fuel when these issues can be resolved generically, and (2) if Intervenors are dissatisfied with this generic approach, their relief cannot be addressed through adjudication but rather through the rulemaking process.195 The update to the generic assessment for spent fuel storage has now been completed and the ban against raising issues associated with the storage of spent fuel remains. The WCD Update includes a position of confidence that spent fuel can be stored safely and without significant environmental impacts. The Intervenors allegations in CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3 that the WCD Update is invalid are a direct challenge to an NRC rule (i.e., the WCD Update as manifested by 10 C.F.R. § 51.23), thus rendering these contentions inadmissible pursuant to 10 C.F.R. § 2.335(a).196 In conjunction with their Reply to the Answers filed by Entergy and the NRC Staff, Clearwater and Riverkeeper seek either an exemption from regulations pursuant to 10 C.F.R.
193 As we have previously noted, it has been the "clear guidance . . . [from the Commission] that challenges to the Waste Confidence Rule must be made in the context of a rulemaking, not in the context of an adjudicative proceeding."
§ 51.6 or a waiver of the regulations in accordance with 10 C.F.R. § 2.335(b) for CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3.197 We have said that we will use a multitude of factors in evaluating the timeliness of a waiver petition, inter alia, the nature of the petition and the time 193 CLI-10-19, 72 NRC at __ (slip op. at 2).
194 The Commission also reiterated its position that: (1) it would not be productive and would be contrary to longstanding policy to litigate the impacts of on-site storage of spent fuel when these issues can be resolved generically, and (2) if Intervenors are dissatisfied with this generic approach, their relief cannot be addressed through adjudication but rather through the rulemaking process.
194 Licensing Board Certification Memorandum and Order at 22.
195   The update to the generic assessment for spent fuel storage has now been completed and the ban against raising issues associated with the storage of spent fuel remains. The WCD Update includes a position of confidence that spent fuel can be stored safely and without significant environmental impacts. The Intervenors' allegations in CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3 that the WCD Update is invalid are a direct challenge to an NRC rule (i.e., the WCD Update as manifested by 10 C.F.R. § 51.23), thus rendering these contentions inadmissible pursuant to 10 C.F.R. § 2.335(a).
195 CLI-10-19, 72 NRC at __ (slip op. at 3).
196 In conjunction with their Reply to the Answers filed by Entergy and the NRC Staff, Clearwater and Riverkeeper seek either an exemption from regulations pursuant to 10 C.F.R.  
196 See Licensing Board Certification Memorandum and Order at 22, app. A.
§ 51.6 or a waiver of the regulations in accordance with 10 C.F.R. § 2.335(b) for CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3.
197 See CW-RK Waiver/Exemption Petition at 2-10.
197 We have said that we will use a multitude of factors in evaluating the timeliness of a waiver petition, inter alia, the nature of the petition and "the time 193 CLI-10-19, 72 NRC at __ (slip op. at 2).
194 Licensing Board Certification Memorandum and Order at 22.
195 CLI-10-19, 72 NRC at __ (slip op. at 3).
196 See Licensing Board Certification Memorandum and Order at 22, app. A.
197 See CW-RK Waiver/Exemption Petition at 2-10.
elapsed between when the petitioner learned of the matters that gave rise to the request and when the petition is filed."
198  We deny Clearwater's and Riverkeeper's Exemption/Waiver Petition as untimely because it was not submitted with these contentions when they were originally filed, as it could and should have been, without any explanation for the late filing.
Specifically, this exemption/waiver was not sought until after Intervenors received the Answers filed by Entergy and the NRC Staff. The Intervenors should have recognized the need in their initial filing for an alternative procedure that requests an exemption or rule waiver or exemption for admission of CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3, and that it would be unfair to raise the same issue in a waiver petition or exemption request for the first time in a reply without affording opposing parties an opportunity to respond to what are common issues among the waiver petition, the exemption request, and the contentions. Even ignoring the untimely nature of this Exemption/Waiver Petition, Clearwater and Riverkeeper have not established the legal basis for the granting of an exemption from 10 C.F.R. § 51.23(b) using the provisions of 10 C.F.R. § 51.6. For the Board to accept the argument proffered by the Intervenors, it would ma ke the waiver provisions of 10 C.F.R. § 2.335 superfluous, and we must read the exemption regulation in pari materia with the waiver regulation. We conclude that 10 C.F.R. § 51.6 should not to be used in the admission of contentions in an adjudicatory proceeding (but instead reserved for an applicant's relief from regulatory requirements), in light of the option concurrently available to a purportedly aggrieved petitioner for waiver pursuant to 10 C.F.R. § 2.335. In support of their waiver request, Clearwater and Riverkeeper repeat the same arguments they make in their contentions, without demonstrating site-specific circumstances at Indian Point that warrant granting the waiver of the regulation set out at 10 C.F.R. § 51.23(b). In 198  Licensing Board Memorandum and Order (Scheduling Prehearing Conference and Ruling on New York State's Motion Requesting Consideration of Additional Matters) (Dec. 18, 2008) at 4 (unpublished).      our view, the issues raised by the Intervenors apply to all nuclear reactor sites. Based on this, we find that Clearwater and Riverkeeper have not made a prima facie showing that application of 10 C.F.R. § 51.23(b) would not serve its intended purpose at Indian Point.
199    Also, we find that it would be redundant to ask the Commission to again look at the same question here that it addressed in CLI-10-19 for Clearwater's Contentions EC-7 and SC-1. Earlier in this proceeding, the Commission, consistent with precedent, reiterated that the environmental and safety impacts of waste storage are not to be addressed in a license renewal proceeding.
200  Its most recent position (as expressed in CLI-10-19), while written to address our certification for Clearwater's Contentions EC-7 and SC-1, applies equally to the decision that must be reached on the new contentions. Stated another way, the issues that would be reviewed should a prima facie case be found in the instant waiver request, have already been addressed by the Commission in CLI-10-19. In summary, we (1) hold that CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3 are inadmissible, (2) deny, for lateness and lack of authority, Clearwater's and Riverkeeper's request for an exemption of the rules in accordance with 10 C.F.R. § 51.6, and (3) in addition to being untimely, find that the Intervenors have not made a prima facie showing that the application of 10 C.F.R. § 51.23(b) would not serve its intended purpose and, accordingly, conclude that a waiver should not be granted. D. CW-EC-9/RK-EC-7 and CW-SC-3/RK-TC-4 Admissibility The remaining contentions relating to the WCD Update, CW-EC-9/RK-EC-7 and CW-SC-3/RK-TC-4, also challenge the Rule, but are specifically applied to an alleged gap (i.e., the period after sixty years from license expiration) in the environmental and safety analyses for the long-term storage of spent fuel at Indian Point. 1. Alleged "Gap" in the Waste Confidence Decision Update


199  See 10 C.F.R. § 2.335(c)-(d).
elapsed between when the petitioner learned of the matters that gave rise to the request and when the petition is filed.198 We deny Clearwaters and Riverkeepers Exemption/Waiver Petition as untimely because it was not submitted with these contentions when they were originally filed, as it could and should have been, without any explanation for the late filing.
200  CLI-10-19, 72 NRC at __ (slip op. at 3).      The heart of the Intervenors' arguments in CW-EC-9/RK-EC-7 and CW-SC-3/RK-TC-4 lies in their opinion that a gap in the scope of Section 51.23(a) emerged with the promulgation of the WCD Update on December 23, 2011. The Intervenors maintain that the gap exists because the Commission's revised generic determination of no significant impact is limited to a sixty-year timeframe following the period of cessation of operations including any extension associated with the period of license renewal.
Specifically, this exemption/waiver was not sought until after Intervenors received the Answers filed by Entergy and the NRC Staff. The Intervenors should have recognized the need in their initial filing for an alternative procedure that requests an exemption or rule waiver or exemption for admission of CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3, and that it would be unfair to raise the same issue in a waiver petition or exemption request for the first time in a reply without affording opposing parties an opportunity to respond to what are common issues among the waiver petition, the exemption request, and the contentions.
201  Contrary to this position, the updated 10 C.F.R. § 51.23(a) states that the Commission generically determined "that, if necessary, spent fuel generated in any reactor can be stored safely and without significant environmental impacts for at least 60 years beyond the licensed life for operation" and "believes there is reasonable assurance that sufficient mined geologic repository capacity will be available to dispose of the commercial high-level radioactive waste and spent fuel generated in any reactor when necessary
Even ignoring the untimely nature of this Exemption/Waiver Petition, Clearwater and Riverkeeper have not established the legal basis for the granting of an exemption from 10 C.F.R. § 51.23(b) using the provisions of 10 C.F.R. § 51.6. For the Board to accept the argument proffered by the Intervenors, it would make the waiver provisions of 10 C.F.R. § 2.335 superfluous, and we must read the exemption regulation in pari materia with the waiver regulation. We conclude that 10 C.F.R. § 51.6 should not to be used in the admission of contentions in an adjudicatory proceeding (but instead reserved for an applicants relief from regulatory requirements), in light of the option concurrently available to a purportedly aggrieved petitioner for waiver pursuant to 10 C.F.R. § 2.335.
."202  The modifiers "at least," and, "when necessary," in the final rule negate any allegation of a gap in the regulatory timeframe covered by the WCD Update and the environmental assessment supporting that decision. It is correct that the Commission only considered sixty years of storage beyond the license renewal period in its generic safety and environmental determinations in the WCD Update. But, consistent with historic practice, the Commission has stated that it will revisit the Waste Confidence Rule as this time frame is approached.
In support of their waiver request, Clearwater and Riverkeeper repeat the same arguments they make in their contentions, without demonstrating site-specific circumstances at Indian Point that warrant granting the waiver of the regulation set out at 10 C.F.R. § 51.23(b). In 198 Licensing Board Memorandum and Order (Scheduling Prehearing Conference and Ruling on New York States Motion Requesting Consideration of Additional Matters) (Dec. 18, 2008) at 4 (unpublished).
203  And, no matter how Clearwater and Riverkeeper try to communicate their arguments, the fact still remains that the Commission has expressed confidence that a geologic repository will be available when necessary, that waste can be stored safely and without significant environmental impacts for at least sixty years beyond the term of a renewed license, and that the Commission will revisit its decision, as it has 201  CW-RK Joint Contentions at 33.
202  10 C.F.R. § 51.23(a) (emphasis added).
203  75 Fed. Reg. at 81,035.      done in the past, if it appears that this timeframe will expire. Nothing in this approach indicates a gap in the time period addressed by the WCD Update. 2. Specific NEPA-Related Issues of CW-EC-9/RK-EC-7 Clearwater's and Riverkeeper's proposed NEPA contentions CW-EC-9/RK-EC-7 allege that the environmental analysis of impacts from relicensing of IP2 and IP3 is inadequate because that analysis only applies to the sixty-year period after the end of the license renewal period. As noted above, the Commission has expressed its view that a repository will be available when necessary and that the WCD will be revisited as the sixty-year period nears its end. Furthermore, the update left intact the statement in Section 51.23(b) that, within the scope of the generic determination in paragraph (a) of that regulation,  no discussion of any environmental impact of spent fuel storage . . . is required in any environmental report, environmental impact statement, environmental assessment or other analysis prepared in connection with the issuance or amendment of an operating license for a nuclear power reactor under parts 50 and 54 of this chapter.
204  The Environmental Assessment (EA) supporting the finding of no significant impact for the additional thirty-year period is part of this WCD Update.
205  Based on this, any challenge to the WCD Update is a direct challenge to NRC regulati ons and, accordingly, is not within the scope of this license renewal proceeding for IP2 and IP3. This holding is consistent with the Commission's recent decision on similar contentions from Clearwater (EC-7 and SC-1).
206  The Intervenors maintain that the exclusion in Section 51.23(b) "is limited to the scope of 51.23, which in turn is limited to 60 years after license expiration."
207  Nevertheless, the fact 204  10 C.F.R. § 51.23(b).
205  75 Fed. Reg. at 81,033.
206  See CLI-10-19, 72 NRC at __ (slip op. at 2-3).
207  CW-RK Joint Contentions Reply at 11.
remains that the Commission has expressed confidence that a geologic repository will be available when necessary and that waste can be stored safely and without significant environmental impacts for at least sixty years beyond the term of a renewed license. As stated supra, any challenges to the Commission's WCD Update must be addressed through rulemaking. It cannot be attacked in this license renewal proceeding.
208  Clearwater and Riverkeeper note that the Commission "has directed the Staff to assess the environmental impact of long term storage for up to 120 years," and thus claim that this assessment must be performed on a site-specific basis prior to issuance of an extended license for Indian Point.
209  However, the Commission directed this study so that it will have timely information to assess the possible need for adjustments to its WCD as the end of the sixty-year period approaches.
210  Because there is no gap in the current WCD Update, the Commission has found no need to complete this study at this time. As Clearwater and Riverkeeper acknowledge, 211 the Commission's WCD has been under constant review for decades and continues to be an ongoing, evolving process. We conclude that the recent initiation of this assessment of the impacts of such long-term storage has no bearing on this license renewal proceeding. New York supported CW-EC-9/RK-EC-7, using similar arguments to those expounded by Clearwater and Riverkeeper, including the need to assess the safety and environmental assessment of spent fuel storage for the post-sixty year period.
212  New York argues that 10 C.F.R. § 51.23(b) "does not bar Clearwater['s] and Riverkeeper's contentions" because "the


208  CLI-10-19, 72 NRC at __ (slip op. at 3).
our view, the issues raised by the Intervenors apply to all nuclear reactor sites. Based on this, we find that Clearwater and Riverkeeper have not made a prima facie showing that application of 10 C.F.R. § 51.23(b) would not serve its intended purpose at Indian Point.199 Also, we find that it would be redundant to ask the Commission to again look at the same question here that it addressed in CLI-10-19 for Clearwaters Contentions EC-7 and SC-1.
209  CW-RK Joint Contentions at 39.
Earlier in this proceeding, the Commission, consistent with precedent, reiterated that the environmental and safety impacts of waste storage are not to be addressed in a license renewal proceeding.200 Its most recent position (as expressed in CLI-10-19), while written to address our certification for Clearwaters Contentions EC-7 and SC-1, applies equally to the decision that must be reached on the new contentions. Stated another way, the issues that would be reviewed should a prima facie case be found in the instant waiver request, have already been addressed by the Commission in CLI-10-19.
210  75 Fed. Reg. at 81,035.
In summary, we (1) hold that CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3 are inadmissible, (2) deny, for lateness and lack of authority, Clearwaters and Riverkeepers request for an exemption of the rules in accordance with 10 C.F.R. § 51.6, and (3) in addition to being untimely, find that the Intervenors have not made a prima facie showing that the application of 10 C.F.R. § 51.23(b) would not serve its intended purpose and, accordingly, conclude that a waiver should not be granted.
211  Cf. CW-RK Joint Contentions at 12-16.
D.     CW-EC-9/RK-EC-7 and CW-SC-3/RK-TC-4 Admissibility The remaining contentions relating to the WCD Update, CW-EC-9/RK-EC-7 and CW-SC-3/RK-TC-4, also challenge the Rule, but are specifically applied to an alleged gap (i.e., the period after sixty years from license expiration) in the environmental and safety analyses for the long-term storage of spent fuel at Indian Point.
212  New York Answer to CW-RK Joint Contentions at 7.
: 1.      Alleged Gap in the Waste Confidence Decision Update 199 See 10 C.F.R. § 2.335(c)-(d).
period following the term of the reactor operating license or amendment" and "within the scope of the generic determination in paragraph (a) of this section" from Section 51.23(b) refer to the sixty-year period stated in 10 C.F.R. § 51.23(a), 213 and the failure of the NRC Staff to complete the analysis for the FSEIS beyond that period is a violation of NEPA and the Atomic Energy Act (AEA).214 As with Clearwater's and Riverkeeper's position, New York's arguments are negated by the Commission's finding that a waste repository will be available when necessary and that the Commission will continue to reassess its WCD Update as the sixty-year period nears an end. Clearwater's and Riverkeeper's contentions are not admissible because they constitute a direct challenge to NRC regulations and are thus not within the scope of this proceeding.
200 CLI-10-19, 72 NRC at __ (slip op. at 3).
215 New York notes that NRC Staff "relies on the wrong version of 10 C.F.R. § 51.23 to assume that a high level waste repository will be available by 2025, even though NRC Staff knew full well that the rule would be changed within days of the FEIS's issuance."
216  While this assertion might be true, given that neither Entergy nor the NRC Staff chose to address this claim in their Answers and the chronology given by New York is plausible, it was not cited by Clearwater and Riverkeeper in their original contention. For New York to raise it now, it should have addressed the requirements for timely filings presented in 10 C.F.R. § 2.309(f)(2), and, if needed, timely filings in 10 C.F.R. § 2.309(c). E. Specific Safety-Related Issues of CW-SC-3/RK-TC-4 This safety related contention alleges that the LRA is inadequate because it provides insufficient analysis of the aging management of the dry casks and spent fuel pools that could 213  Id. at 10 (emphasis added).
214  Id. at 11-22.
215  See 10 C.F.R. §§ 2.335(a), 2.309(f)(1)(iii).
216  Id. at 17.      be used during the post-sixty-year period after the license renewal term. Most of Clearwater's and Riverkeeper's discussion relating to this safety contention is a repeat of the arguments they presented for their NEPA-related contentions dealing with issues commencing sixty years after the license renewal period. In dealing with the safety of spent fuel storage, this contention is inadmissible as a direct challenge to the WCD Update 217 and, in derogation of 10 C.F.R. § 2.309(f)(1)(iii), is not within the scope of this license renewal proceeding . In their Joint Motion for Leave to file these contentions, Clearwater and Riverkeeper make numerous allegations attacking the adequacy of the Commission's WCD Update that they


contend apply to both the Motion's NEPA- and safety-related issues, including the NRC's allegedly inappropriate reliance on the WCD, the Commission's alteration of part of the Waste Confidence Rule, and the need for the NRC, as part of its license renewal review in this proceeding, to complete additional site-specific review for the post-sixty-year period.
The heart of the Intervenors arguments in CW-EC-9/RK-EC-7 and CW-SC-3/RK-TC-4 lies in their opinion that a gap in the scope of Section 51.23(a) emerged with the promulgation of the WCD Update on December 23, 2011. The Intervenors maintain that the gap exists because the Commissions revised generic determination of no significant impact is limited to a sixty-year timeframe following the period of cessation of operations including any extension associated with the period of license renewal.201 Contrary to this position, the updated 10 C.F.R. § 51.23(a) states that the Commission generically determined that, if necessary, spent fuel generated in any reactor can be stored safely and without significant environmental impacts for at least 60 years beyond the licensed life for operation and believes there is reasonable assurance that sufficient mined geologic repository capacity will be available to dispose of the commercial high-level radioactive waste and spent fuel generated in any reactor when necessary.202 The modifiers at least, and, when necessary, in the final rule negate any allegation of a gap in the regulatory timeframe covered by the WCD Update and the environmental assessment supporting that decision.
218  In a broad fashion, Clearwater and Riverkeeper attempt to justify the timeliness of the contentions by pointing out that the WCD Update is new and significant information, to discuss how the new contentions are within the scope of license renewal, and to provide general examples of "multiple material disputes" raised by these allegations.
It is correct that the Commission only considered sixty years of storage beyond the license renewal period in its generic safety and environmental determinations in the WCD Update. But, consistent with historic practice, the Commission has stated that it will revisit the Waste Confidence Rule as this time frame is approached.203 And, no matter how Clearwater and Riverkeeper try to communicate their arguments, the fact still remains that the Commission has expressed confidence that a geologic repository will be available when necessary, that waste can be stored safely and without significant environmental impacts for at least sixty years beyond the term of a renewed license, and that the Commission will revisit its decision, as it has 201 CW-RK Joint Contentions at 33.
219  All of these positions are presented by these Intervenors as overarching issues applicable to both their NEPA- and safety-related contentions. However, how these arguments relate to their contention that Entergy has not provided sufficient analysis of aging management for the long-term storage of spent fuel is not adequately explained. Clearwater and Riverkeeper have not provided any specific allegations addressing the adequacy of Entergy's aging management of these storage alternatives for the license renewal period. In fact, the Intervenors fail to mention the components of the spent fuel 217  See 10 C.F.R. § 2.335(a).
202 10 C.F.R. § 51.23(a) (emphasis added).
218  See CW-RK Joint Contentions at 18-40.
203 75 Fed. Reg. at 81,035.
219  Id. at 40-47.      pool that have been discussed in Entergy's AMP.
220  Nor, as NRC Staff points out, did they cite any regulation that requires the aging management program to be extended more than sixty years after the term of the license when all other systems, structures, and components need only address aging management for the term of the license extension.
221  As a result, the Intervenors have failed to provide support for why these arguments have any bearing on the required safety analysis of aging management required for license renewal. F. Board Decision The WCD Update has examined the safety and environmental impacts of on-site storage of spent fuel pending final off-site disposal, rendering it inappropriate for license renewal proceedings to litigate this issue. Accordingly, we find that Clearwater's and Riverkeeper's proposed contentions CW-EC-8/RK-EC-6, CW-SC-2/RK-TC-3, CW-EC-9/RK-EC-7, and CW-SC-3/RK-TC-4 are direct challenges to NRC regul ations and are therefore outside the scope of this license renewal proceeding for IP2 and IP3 pursuant to 10 C.F.R. § 2.309(f)(1)(iii). Accordingly, these proposed contentions are inadmissible. VIII. AMENDED CW-EC-3 (CW-EC-3A)
A. Procedural Background We admitted Clearwater EC-3 (CW-EC-3) to t he extent it claimed "that Entergy's ER [was] deficient because it d[id] not supply sufficient information from which the Commission [could] properly consider, and publicly disclose, environmental factors that may cause harm to 220  See Entergy Answer to CW-RK Joint Contentions at 21 (referencing Indian Point Energy Center License Renewal Application Technical Information at tbls. 3.3.2-1, 3.5.2-3 (Apr. 2007) [hereinafter LRA AMP]); NRC Staff Answer to CW-RK Joint Contentions at 30-31 (referencing LRA AMP at tbl. 3.5.2-3).  


221  NRC Staff Answer to CW-RK Joint Contentions at 31 (referencing 10 C.F.R. § 50.54(bb)).
done in the past, if it appears that this timeframe will expire. Nothing in this approach indicates a gap in the time period addressed by the WCD Update.
minority and low-income populations that would be 'disproportionate to that suffered by the general population.'"
: 2.      Specific NEPA-Related Issues of CW-EC-9/RK-EC-7 Clearwaters and Riverkeepers proposed NEPA contentions CW-EC-9/RK-EC-7 allege that the environmental analysis of impacts from relicensing of IP2 and IP3 is inadequate because that analysis only applies to the sixty-year period after the end of the license renewal period. As noted above, the Commission has expressed its view that a repository will be available when necessary and that the WCD will be revisited as the sixty-year period nears its end.
222 On February 3, 2011, Clearwater moved to amend and extend CW-EC-3.
Furthermore, the update left intact the statement in Section 51.23(b) that, within the scope of the generic determination in paragraph (a) of that regulation, no discussion of any environmental impact of spent fuel storage . . . is required in any environmental report, environmental impact statement, environmental assessment or other analysis prepared in connection with the issuance or amendment of an operating license for a nuclear power reactor under parts 50 and 54 of this chapter.204 The Environmental Assessment (EA) supporting the finding of no significant impact for the additional thirty-year period is part of this WCD Update.205 Based on this, any challenge to the WCD Update is a direct challenge to NRC regulations and, accordingly, is not within the scope of this license renewal proceeding for IP2 and IP3. This holding is consistent with the Commissions recent decision on similar contentions from Clearwater (EC-7 and SC-1).206 The Intervenors maintain that the exclusion in Section 51.23(b) is limited to the scope of 51.23, which in turn is limited to 60 years after license expiration.207 Nevertheless, the fact 204 10 C.F.R. § 51.23(b).
223  Clearwater's proposed amendment, labeled herein as CW-EC-3A, first alleges that "Entergy's Environmental Report and the Final Supplemental Environmental Impact Statement contain seriously flawed environmental justice [EJ] analyses that do not adequately assess the impacts of relicensing Indian Point on the minority, low-income and disabled populations in the area surrounding Indian Point."
205 75 Fed. Reg. at 81,033.
224  Clearwater framed this claim as a "technical change" to the admitted CW-EC-3, in that it adds to the admitted contention the charge that the FSEIS's discussion of EJ is deficient for its reliance on a generic analysis and its failure to look at the impact from emergency planning on EJ populations.
206 See CLI-10-19, 72 NRC at __ (slip op. at 2-3).
225 In addition, for the first time CW-EC-3A alleges that "the assessment of the impact of the no-action alternative on potentially affected environmental justice populations is inadequate,"
207 CW-RK Joint Contentions Reply at 11.
and that "the assessment of the impact of adding closed cycle cooling on air quality and on potentially affected local environmental justice populations is inadequate."
226  According to 222  LBP-08-13, 68 NRC at 201 (citing Sys. Energy Res., Inc. (Early Site Permit for Grand Gulf ESP Site), CLI-05-04, 61 NRC 10, 13 (2005)).
223  Motion for Leave to Amend and Extend Contention EC-3 Regarding Environmental Justice and Petition to Do So (Feb. 3, 2011) [hereinafter Amended CW-EC-3]. On March 7, 2011, Entergy and the NRC Staff filed Answers supporting in part and opposing in part the amendment of CW-EC-3. Applicant's Answer to Hudson River Sloop Clearwater, Inc.'s Amended Environmental Justice Contention (Mar. 7, 2011) [hereinafter Entergy Answer to Amended CW-EC-3]; NRC Staff's Answer to Amended and New Contention (EC-3) Filed by Hudson River Sloop Clearwater, Inc. Concerning the Final Supplemental Environmental Impact Statement (Mar. 7, 2011) [hereinafter NRC Staff Answer to Amended CW-EC-3]. Clearwater replied to Entergy's and the NRC Staff's Answers on March 21, 2011. Combined Reply to NRC Staff and Entergy's Answers in Opposition to Clearwater's Motion for Leave and Petition to Amend Contention EC-3 (Mar. 21, 2011) [hereinafter Amended CW-EC-3 Reply].  


224  Amended CW-EC-3 at 15 (emphasis in original omitted).
remains that the Commission has expressed confidence that a geologic repository will be available when necessary and that waste can be stored safely and without significant environmental impacts for at least sixty years beyond the term of a renewed license. As stated supra, any challenges to the Commissions WCD Update must be addressed through rulemaking. It cannot be attacked in this license renewal proceeding.208 Clearwater and Riverkeeper note that the Commission has directed the Staff to assess the environmental impact of long term storage for up to 120 years, and thus claim that this assessment must be performed on a site-specific basis prior to issuance of an extended license for Indian Point.209 However, the Commission directed this study so that it will have timely information to assess the possible need for adjustments to its WCD as the end of the sixty-year period approaches.210 Because there is no gap in the current WCD Update, the Commission has found no need to complete this study at this time. As Clearwater and Riverkeeper acknowledge,211 the Commissions WCD has been under constant review for decades and continues to be an ongoing, evolving process. We conclude that the recent initiation of this assessment of the impacts of such long-term storage has no bearing on this license renewal proceeding.
225  See id. at 3, 19.
New York supported CW-EC-9/RK-EC-7, using similar arguments to those expounded by Clearwater and Riverkeeper, including the need to assess the safety and environmental assessment of spent fuel storage for the post-sixty year period.212 New York argues that 10 C.F.R. § 51.23(b) does not bar Clearwater[s] and Riverkeepers contentions because the 208 CLI-10-19, 72 NRC at __ (slip op. at 3).
226  Id. at 16.      Clearwater, these new claims regarding the impacts of the no-action alternative, and from adding closed-cycle cooling, arise because the NRC did not independently evaluate comments to the DSEIS made by organizations supportive of relicensing Indian Point. Clearwater claims these groups are funded by Entergy and exaggerate the negative air quality impacts from the no-action alternative.
209 CW-RK Joint Contentions at 39.
227 Entergy does not oppose the admission of CW-EC-3A to the extent it updates claims made on Entergy's ER to the FSEIS, but states its opposition to the admission of any claims regarding emergency planning impacts on EJ populations.
210 75 Fed. Reg. at 81,035.
228  Moreover, because it represents that the data or conclusions in the FSEIS do not differ significantly from those in the DSEIS, Entergy contends that Clearwater's amendments regarding the no-action alternative and closed-cycle cooling are not timely filed.
211 Cf. CW-RK Joint Contentions at 12-16.
229  Entergy also maintains that additional scrutiny of the no-action alternative's impact on EJ populations is immaterial to the NRC's licensing decision in this proceeding given that the FSEIS already concludes that those impacts would be small to moderate.230  Similarly, Entergy urges the Board to view CW-EC-3A as having neither the requisite support "indicating how or why [the FSEIS's analysis of the no-action alternative]
212 New York Answer to CW-RK Joint Contentions at 7.
should have been conducted differently" nor showing "why the air quality impacts from closed cycle cooling would fall disproportionately on minority or low-income populations."
231  Lastly, Entergy maintains that the no-action and closed-cycle cooling alternatives do not raise genuine disputes with the FSEIS because the FSEIS has satisfactorily addressed the comments made on the DSEIS. Also, Entergy argues that Clearwater has not challenged the analysis and 227  See id. at 3-10, 20-22.
228  Entergy Answer to Amended CW-EC-3 at 9-10.
229  Id. at 11-13, 19-20.
230  Id. at 14-15.
231  Id. at 16-21.
conclusions reached in the FSEIS, has not explained why minority populations would disproportionately be affected by impacts compared to the general population, and has not demonstrated that the NRC Staff has failed to reach its conclusions independently.
232 The NRC Staff agrees with Entergy regarding CW-EC-3A inasmuch as it updates Clearwater's challenges to the ER to the FSEIS and objects to Clearwater raising any concerns over emergency planning.
233  However, the NRC Staff characterizes Clearwater's challenges to the FSEIS's no-action alternative analysis as untimely, as failing to raise a material dispute with the FSEIS, as an incorrect reading of the FSEIS, and as too vague to be admissible.
234  Further, the NRC Staff describes the closed-cycle cooling aspect of CW-EC-3A as unsupported, immaterial to the NRC's licensing decision, and based on an erroneous reading of the FSEIS.
235 Clearwater replies that CW-EC-3A is timely filed because Section 2.309(f)(2) permits amended contentions to be filed based on the FSEIS, even if an intervenor has not challenged similar data or conclusions in the DSEIS, and that the information giving rise to the contention was presented for the first time in the FSEIS.
236  In the alternative, Clearwater asserts that it has shown good cause, pursuant to Section 2.309(c)(1), to have filed this amended contention when it did, because it could not have anticipated that Entergy would encourage various organizations to submit comments on the DSEIS, and that the NRC Staff would inadequately respond to those comments.237 232  Id. at 16-18, 21-22.
233  NRC Staff Answer to CW-EC-3 at 8-9.
234  Id. at 9-18.
235  Id. at 19-21.
236  Amended CW-EC-3 Reply at 3-6, 9-10.
237  Id. at 6-9.      Further, Clearwater argues that CW-EC-3A raises a material issue in this proceeding because its criticisms of the FSEIS's no-action and closed-cycle cooling alternative analyses show that the NRC Staff has failed to reach any conclusions of the impact of these alternatives on EJ populations.
238  According to Clearwater, given that the FSEIS does not appropriately respond to those comments on this issue made in response to the DSEIS and provide the NRC Staff's own information to address them, Entergy's "manipulat[ion of] the comment process" led the NRC Staff to insufficiently analyze the adver se impacts from the no-action and closed-cycle cooling alternative to the same EJ populations alleged to be represented by these commenters.
239  Finally, Clearwater contends that CW-EC-3A does not challenge Entergy's emergency planning. Instead, Clearwater states that it is attacking the NRC "Staff's failure to analyze mitigation for the disparate impacts of the proposed action" on EJ populations.
240  These populations include not only the Sing Sing prisoners mentioned by the Board in LBP-08-13, but also other EJ populations within 50 miles of Indian Point 241 in pre-schools, nursing homes, shelters, hospitals, and minority and low-income residents in the region who lack access to


private transportation.
period following the term of the reactor operating license or amendment and within the scope of the generic determination in paragraph (a) of this section from Section 51.23(b) refer to the sixty-year period stated in 10 C.F.R. § 51.23(a),213 and the failure of the NRC Staff to complete the analysis for the FSEIS beyond that period is a violation of NEPA and the Atomic Energy Act (AEA).214 As with Clearwaters and Riverkeepers position, New Yorks arguments are negated by the Commissions finding that a waste repository will be available when necessary and that the Commission will continue to reassess its WCD Update as the sixty-year period nears an end.
242 B. Board Decision We admit those portions of CW-EC-3A that seek to update the contention as originally admitted. However, we reject the remainder of the amended contentions on timeliness and materiality grounds.
Clearwaters and Riverkeepers contentions are not admissible because they constitute a direct challenge to NRC regulations and are thus not within the scope of this proceeding.215 New York notes that NRC Staff relies on the wrong version of 10 C.F.R. § 51.23 to assume that a high level waste repository will be available by 2025, even though NRC Staff knew full well that the rule would be changed within days of the FEISs issuance.216 While this assertion might be true, given that neither Entergy nor the NRC Staff chose to address this claim in their Answers and the chronology given by New York is plausible, it was not cited by Clearwater and Riverkeeper in their original contention. For New York to raise it now, it should have addressed the requirements for timely filings presented in 10 C.F.R. § 2.309(f)(2), and, if needed, timely filings in 10 C.F.R. § 2.309(c).
238  Id. at 10-12.
E. Specific Safety-Related Issues of CW-SC-3/RK-TC-4 This safety related contention alleges that the LRA is inadequate because it provides insufficient analysis of the aging management of the dry casks and spent fuel pools that could 213 Id. at 10 (emphasis added).
239  Id. at 12-16.
214 Id. at 11-22.
240  Id. at 18. 241  Clearwater references the recent events at the Fukushima Daiichi Nuclear Power Plant and the NRC's recommendation that populations within fifty miles of that facility be evacuated.
215 See 10 C.F.R. §§ 2.335(a), 2.309(f)(1)(iii).
242  Id. at 18-19.
216 Id. at 17.
In order to directly challenge facts or conclusions stated in the FSEIS through timely filed new or amended contentions, Clearwater must identify significant differences between the data and conclusions in the DSEIS and the FSEIS.
243  This policy is consistent with the Commission's longstanding and pervasive position that requires intervenors to challenge deficiencies at the earliest possible time.
244  Having chosen not to challenge the DSEIS, Clearwater cannot now directly challenge aspects of the FSEIS that have not differed


significantly from the DSEIS.
be used during the post-sixty-year period after the license renewal term. Most of Clearwaters and Riverkeepers discussion relating to this safety contention is a repeat of the arguments they presented for their NEPA-related contentions dealing with issues commencing sixty years after the license renewal period. In dealing with the safety of spent fuel storage, this contention is inadmissible as a direct challenge to the WCD Update217 and, in derogation of 10 C.F.R.
245  If, however, a party made comments to the DSEIS that are not adequately addressed in the FSEIS, then the triggering event for a timely challenge would be the publication of the FSEIS. Nevertheless, in this Motion Clearwater did not identify actual deficiencies in the NRC's response to comments. Rather, it challenged the motives of commenters, an issue that is irrelevant. Regardless of the commenters' motives, comments must be addressed by the NRC Staff and any challenge to the NRC Staff's response to a comment must point to errors in how the comment was resolved in the FSEIS. Clearwater, however, did not catalogue the DSEIS comments nor explain why the NRC Staff's responses to them were inadequate.
§ 2.309(f)(1)(iii), is not within the scope of this license renewal proceeding .
246 243  10 C.F.R. § 2.309(f)(2).
In their Joint Motion for Leave to file these contentions, Clearwater and Riverkeeper make numerous allegations attacking the adequacy of the Commissions WCD Update that they contend apply to both the Motions NEPA- and safety-related issues, including the NRCs allegedly inappropriate reliance on the WCD, the Commissions alteration of part of the Waste Confidence Rule, and the need for the NRC, as part of its license renewal review in this proceeding, to complete additional site-specific review for the post-sixty-year period.218 In a broad fashion, Clearwater and Riverkeeper attempt to justify the timeliness of the contentions by pointing out that the WCD Update is new and significant information, to discuss how the new contentions are within the scope of license renewal, and to provide general examples of multiple material disputes raised by these allegations.219 All of these positions are presented by these Intervenors as overarching issues applicable to both their NEPA- and safety-related contentions.
244  Progress Energy Florida, Inc. (Combined License Application, Levy County Nuclear Power Plant, Units 1 and 2), CLI-10-02, 71 NRC __, __ (slip op. at 9) (Jan. 7, 2010) (citing Duke Power Co. (Catawba Nuclear Station, Units 1 and 2), CLI-83-19, 17 NRC 1041, 1050 (1983)).
However, how these arguments relate to their contention that Entergy has not provided sufficient analysis of aging management for the long-term storage of spent fuel is not adequately explained. Clearwater and Riverkeeper have not provided any specific allegations addressing the adequacy of Entergys aging management of these storage alternatives for the license renewal period. In fact, the Intervenors fail to mention the components of the spent fuel 217 See 10 C.F.R. § 2.335(a).
245  10 C.F.R. § 2.309(f)(2).
218 See CW-RK Joint Contentions at 18-40.
246  See Amended CW-EC-3 at 4 (only alleging that "Clearwater, Riverkeeper, and others pointed out that Section 8.2 of the DSEIS was flawed because it did not consider and analyze new information about various measures that could be taken if the no-action alternative were implemented as compared to the detrimental impact of relicensing the plant. FSEIS at A-153. These omissions were addressed obliquely in the FSEIS, but the NRC failed to adequately address the issue. E.g.
219 Id. at 40-47.
FSEIS at A-154.").
Part of the NRC Staff's responsibility in preparing its FSEIS is responding to comments made on the DSEIS.
247  Contentions alleging that the NRC Staff has not fulfilled its obligation to take a hard look in its FSEIS at comments filed on the DSEIS can be within the scope of this proceeding pursuant to 10 C.F.R. § 2.309(f)(1)(iii). However, as we stated before, such a contention must also show "why the alleged error or omission is of possible significance to the result of the proceeding," namely, "some significant link between the claimed deficiency and either the health and safety of the public, or the environment."
248  Clearwater asserts that the NRC Staff did not look hard enough at the potential health impacts of the no-action alternative as stated in comments on the DSEIS from groups purportedly affiliated with Entergy.
249  However, the identity of those groups is irrelevant to whether the NRC Staff has given a hard look at their comments. We are not told why the comments were misleading or how the NRC Staff's analysis of them was deficient, beyond a challenge to the motives of the commenters and unsupported conclusions regarding the accuracy of the comments and the NRC Staff's assessment thereof. The purpose of the no-action alternative is for the agency to review and allow the public to understand its review of both the positive and negative impacts that would result from remaining with the status quo rather than proceeding with the proposed action.
250  If Clearwater's position in CW-EC-3A was that the actual no-action alternative is more preferable than the NRC Staff's description of the no-action alternative, such a position might lead to a dispute over whether the NRC Staff has incorrectly minimized the benefits or maximized the 247  10 C.F.R. § 51.91(a); Dominion Nuclear North Anna, LLC (Early Site Permit for North Anna ESP Site), CLI-07-27, 66 NRC 215, 224 (2007).
248  LBP-08-13, 68 NRC at 62.
249  Amended CW-EC-3 at 3-8.
250  See Kilroy v. Ruckelshaus, 738 F.2d 1448, 1453 (9th Cir. 1984) (citations omitted) (explaining the objectives of analyzing the no-action alternative).
adverse impacts of the no-action alternative. Instead, Clearwater only asserted that the untrustworthiness of the commenters claiming to represent EJ populations could potentially impact the relicensing decision for IP2 and IP3. Moreover, Clearwater has not pointed to specific impacts potentially flowing to EJ populations in the no-action alternative that have not been addressed by the NRC Staff. Clearwater offers no critique of the NRC's analysis other than to note that it "mirrors Entergy's public relations slogan" and suggests that "the FSEIS should have treated them with great care."
251  Accordingly, Clearwater has neither raised an issue that is material to the NRC's licensing decision in this proceeding pursuant to 10 C.F.R.
§ 2.309(f)(1)(iv) nor alleged any facts or provided expert opinions to controvert the analysis in the FSEIS. Therefore, this aspect of CW-EC-3A is inadmissible. In addition, Clearwater's expressed concern over the closed-cycle cooling alternative is that the FSEIS's analysis "is both too indeterminate to be useful and entirely dependent on the assertions of Entergy."
252  However, Clearwater has not provided any alleged facts or expert opinion challenging the FSEIS's analysis of the closed-cycle cooling alternative. In its Motion, Clearwater states that it and others commented on the DSEIS, pointing out that the relicensing of IP2 and IP3 would have the potential for disparate impacts on potentially affected EJ populations 253  But Clearwater merely reproduces concerns raised by an engineer, Bill Powers, regarding the Staff's review in the Oyster Creek license renewal proceeding, says that the NRC lacks independent judgment, and asserts (without support) that the NRC Staff did not look hard enough at the air quality impacts from pursuing replacement power costs and their possible 251  See Amended CW-EC-3 at 4, 6.
252  Id. at 9. 253  Id. at 3.        effect on EJ populations.
254  These vague allegations do not meet the minimal pleading requirements for an admissible contention.
255  In preparing its FSEIS, the NRC Staff may rely on information submitted by an applicant such as Entergy, as long as that information is independently verified by the NRC Staff.
256  Beyond its bare assertions, Clearwater has not explained why it believes the NRC Staff has failed to conduct such an independent verification in its FSEIS. Therefore, the closed-cycle cooling aspect of CW-EC-3A is inadmissible pursuant to 10 C.F.R. § 2.309(f)(1)(v) and (vi). In summary, Clearwater's Motion to Amend and Extend CW-EC-3 is granted in part and denied in part. CW-EC-3A is consolidated with CW-EC-3 as CW-EC-3A and is amended to read as follows: Entergy's environmental report and the Final Supplemental Environmental Impact Statement contain seriously flawed environmental justice analyses that do not adequately assess the impacts of relicensing Indian Point on the minority, low-income and disabled populations in the area surrounding Indian Point.
257 IX. RK-EC-8 A. Parties' Positions On February 3, 2011, Riverkeeper moved to admit Contention EC-8 (RK-EC-8), 258 which contends that the FSEIS is inadequate because it does not "include or consider the assessment 254  See id. at 8-10.
255  See 10 C.F.R. § 2.309(f)(1)(i).
256  See Sierra Club v. Van Antwerp, 719 F. Supp. 2d 58, 69 (D.D.C. 2010) (stating that "the [Army] Corps [of Engineers] may rely on information submitted by the applicant but must independently verify such information").  


257  Amended CW-EC-3 at 15.
pool that have been discussed in Entergys AMP.220 Nor, as NRC Staff points out, did they cite any regulation that requires the aging management program to be extended more than sixty years after the term of the license when all other systems, structures, and components need only address aging management for the term of the license extension.221 As a result, the Intervenors have failed to provide support for why these arguments have any bearing on the required safety analysis of aging management required for license renewal.
258  Riverkeeper Inc. Consolidated Motion for Leave to File a New Contention and New Contention Concerning NRC Staff's Final Supplemental Environmental Impact Statement (Feb.
F. Board Decision The WCD Update has examined the safety and environmental impacts of on-site storage of spent fuel pending final off-site disposal, rendering it inappropriate for license renewal proceedings to litigate this issue. Accordingly, we find that Clearwaters and Riverkeepers proposed contentions CW-EC-8/RK-EC-6, CW-SC-2/RK-TC-3, CW-EC-9/RK-EC-7, and CW-SC-3/RK-TC-4 are direct challenges to NRC regulations and are therefore outside the scope of this license renewal proceeding for IP2 and IP3 pursuant to 10 C.F.R. § 2.309(f)(1)(iii).
3, 2011) [hereinafter RK-EC-8]. Entergy and the NRC Staff filed answers to RK-EC-8 on March 7, 2011. Applicant's Answer to Riverkeeper, Inc.'s Motion for Leave and New Contention Concerning the Consideration of Endangered and Threatened Aquatic Species (Mar. 7, 2011) [hereinafter Entergy Answer to RK-EC-8]; NRC Staff's Answer to Riverkeeper, Inc.'s Motion for Leave to File a New Contention, and New Contention EC-8 Concerning NRC Staff's Final      of the National Marine Fisheries Service ('NMFS') regarding impacts to endangered species due to incomplete [Endangered Species Act] ESA § 7 consultation procedures."
Accordingly, these proposed contentions are inadmissible.
259  Riverkeeper argues that the NRC cannot grant Entergy's LRA for IP2 and IP3 unless the NRC Staff issues a supplemental EIS "that fully considers the outcome of the consultation process, including NMFS' forthcoming biological opinion."
VIII. AMENDED CW-EC-3 (CW-EC-3A)
260  Because the NRC Staff did not complete its consultation with NMFS regarding the shortnose sturgeon (an endangered species) and the Atlantic sturgeon (a candidate for listing as threatened or endangered) prior to issuing the FSEIS, Riverkeeper argues that the NRC's conclusions in the FSEIS were not fully informed by the requisite input from NMFS and thus lacked a har d look as required by NEPA.
A. Procedural Background We admitted Clearwater EC-3 (CW-EC-3) to the extent it claimed that Entergys ER
261  Riverkeeper also represents that RK-EC-8 is based on new information that differs significantly from information previously available because Riverkeeper had no way of knowing that the NRC Staff would issue its FSEIS without completing ESA consultation with NMFS.
[was] deficient because it d[id] not supply sufficient information from which the Commission
262 Entergy opposes admission of RK-EC-8, maintaining that RK-EC-8 was not timely filed to the extent it challenges the sufficiency of the NRC Staff's consultation with NMFS because Riverkeeper could have brought this challenge when that consultation began, or earlier in the consultation process before the FSEIS was issued.
[could] properly consider, and publicly disclose, environmental factors that may cause harm to 220 See Entergy Answer to CW-RK Joint Contentions at 21 (referencing Indian Point Energy Center License Renewal Application Technical Information at tbls. 3.3.2-1, 3.5.2-3 (Apr. 2007)
263  Even if Riverkeeper's petition is deemed timely, Entergy argues that RK-EC-8 does not raise a genuine dispute on a material issue of law or fact because (1) there is no requirement for the NRC to complete its ESA § 7 consultation Supplemental Environmental Impact Statement (Mar. 7, 2011) [hereinafter NRC Staff Answer to RK-EC-8]. Riverkeeper replied on March 14, 2011. Riverkeeper Inc. Combined Reply to NRC Staff and Entergy Answers to Riverkeeper's Motion for Leave to File a New Contention and New Contention Concerning NRC Staff's Final Supplemental Environmental Impact Statement (Mar.
[hereinafter LRA AMP]); NRC Staff Answer to CW-RK Joint Contentions at 30-31 (referencing LRA AMP at tbl. 3.5.2-3).
14, 2011) [hereinafter RK-EC-8 Reply].  
221 NRC Staff Answer to CW-RK Joint Contentions at 31 (referencing 10 C.F.R. § 50.54(bb)).


259  RK-EC-8 at 1.
minority and low-income populations that would be disproportionate to that suffered by the general population.222 On February 3, 2011, Clearwater moved to amend and extend CW-EC-3.223 Clearwaters proposed amendment, labeled herein as CW-EC-3A, first alleges that Entergys Environmental Report and the Final Supplemental Environmental Impact Statement contain seriously flawed environmental justice [EJ] analyses that do not adequately assess the impacts of relicensing Indian Point on the minority, low-income and disabled populations in the area surrounding Indian Point.224 Clearwater framed this claim as a technical change to the admitted CW-EC-3, in that it adds to the admitted contention the charge that the FSEISs discussion of EJ is deficient for its reliance on a generic analysis and its failure to look at the impact from emergency planning on EJ populations.225 In addition, for the first time CW-EC-3A alleges that the assessment of the impact of the no-action alternative on potentially affected environmental justice populations is inadequate, and that the assessment of the impact of adding closed cycle cooling on air quality and on potentially affected local environmental justice populations is inadequate.226 According to 222 LBP-08-13, 68 NRC at 201 (citing Sys. Energy Res., Inc. (Early Site Permit for Grand Gulf ESP Site), CLI-05-04, 61 NRC 10, 13 (2005)).
260  Id. 261  See id. at 7 n.6, 12, 17-18.
223 Motion for Leave to Amend and Extend Contention EC-3 Regarding Environmental Justice and Petition to Do So (Feb. 3, 2011) [hereinafter Amended CW-EC-3]. On March 7, 2011, Entergy and the NRC Staff filed Answers supporting in part and opposing in part the amendment of CW-EC-3. Applicants Answer to Hudson River Sloop Clearwater, Inc.s Amended Environmental Justice Contention (Mar. 7, 2011) [hereinafter Entergy Answer to Amended CW-EC-3]; NRC Staffs Answer to Amended and New Contention (EC-3) Filed by Hudson River Sloop Clearwater, Inc. Concerning the Final Supplemental Environmental Impact Statement (Mar. 7, 2011) [hereinafter NRC Staff Answer to Amended CW-EC-3]. Clearwater replied to Entergys and the NRC Staffs Answers on March 21, 2011. Combined Reply to NRC Staff and Entergys Answers in Opposition to Clearwaters Motion for Leave and Petition to Amend Contention EC-3 (Mar. 21, 2011) [hereinafter Amended CW-EC-3 Reply].
262  See id. at 18-19.
224 Amended CW-EC-3 at 15 (emphasis in original omitted).
263  Entergy Answer to RK-EC-8 at 13-14.      with NMFS prior to issuing the FSEIS, (2) the NRC Staff need not supplement the FSEIS once the ESA consultation process is complete, and (3) the NRC Staff has not violated any time restrictions in the preparation of its Biological Assessment (BA).
225 See id. at 3, 19.
264 The NRC Staff also opposes admission of RK-EC-8. First, the NRC Staff represents that it has complied with the ESA even though it issued the FSEIS before completion of consultation with NMFS because "[i]ssuance of the FSEIS does not cause or amount to an 'irreversible or irretrievable commitment of resources,'" and the procedure of issuing the FSEIS before completion of ESA § 7 consultation has been followed by the NRC Staff in another license renewal proceeding.
226 Id. at 16.
265  Thus, the NRC Staff, like Entergy, reasons that RK-EC-8 raises no genuine dispute because there is nothing in the ESA or NEPA expressly requiring the NRC Staff to complete its consultation with NMFS before issuance of the FSEIS.
266  Further, the NRC Staff claims that RK-EC-8 is untimely because it challenges information in the NRC Staff's Revised BA and thus could have been raised when the NRC Staff issued its Original BA and DSEIS in December 2008.
267  Likewise, the NRC Staff also considers RK-EC-8 untimely to the extent it challenges the NRC Staff's Revised BA, which was issued in December 2010 after the 264  Id. at 14-20.
265  NRC Staff Answer to RK-EC-8 at 11.
266  Id. at 12-15. Shortly after Riverkeeper's Reply was filed, the NRC Staff filed a supplement to its Answer to RK-EC-8. This supplement announced that "the expected completion date of formal consultations has been extended to May 15, 2011, and the expected issuance date of NMFS' Biological Opinion has been extended to June 29, 2011, unless further extended."  Supplement to NRC Staff's Answer to Riverkeeper, Inc.'s Motion for Leave to File a New Contention, and New Contention EC-8 Concerning NRC Staff's Final Supplemental Environmental Impact Statement (Mar. 16, 2011) at 2 [hereinafter Supplement to NRC Staff Answer to RK-EC-8]. As of the date of this decision, the Board has not been notified that the Biological Opinion has been issued.  


267  Id. at 17-19.
Clearwater, these new claims regarding the impacts of the no-action alternative, and from adding closed-cycle cooling, arise because the NRC did not independently evaluate comments to the DSEIS made by organizations supportive of relicensing Indian Point. Clearwater claims these groups are funded by Entergy and exaggerate the negative air quality impacts from the no-action alternative.227 Entergy does not oppose the admission of CW-EC-3A to the extent it updates claims made on Entergys ER to the FSEIS, but states its opposition to the admission of any claims regarding emergency planning impacts on EJ populations.228 Moreover, because it represents that the data or conclusions in the FSEIS do not differ significantly from those in the DSEIS, Entergy contends that Clearwaters amendments regarding the no-action alternative and closed-cycle cooling are not timely filed.229 Entergy also maintains that additional scrutiny of the no-action alternatives impact on EJ populations is immaterial to the NRCs licensing decision in this proceeding given that the FSEIS already concludes that those impacts would be small to moderate.230 Similarly, Entergy urges the Board to view CW-EC-3A as having neither the requisite support indicating how or why [the FSEISs analysis of the no-action alternative]
FSEIS, because the Board only extended the normal thirty-day window to file new contentions arising under the FSEIS, not for new contentions arising under the Revised BA.
should have been conducted differently nor showing why the air quality impacts from closed cycle cooling would fall disproportionately on minority or low-income populations.231 Lastly, Entergy maintains that the no-action and closed-cycle cooling alternatives do not raise genuine disputes with the FSEIS because the FSEIS has satisfactorily addressed the comments made on the DSEIS. Also, Entergy argues that Clearwater has not challenged the analysis and 227 See id. at 3-10, 20-22.
268 Riverkeeper replies that the final NEPA document issued by the NRC Staff should have considered the results of the ESA § 7 consultation process.
228 Entergy Answer to Amended CW-EC-3 at 9-10.
269  Likewise, Riverkeeper emphasizes that the precedent (both NRC Staff practice and federal caselaw), cited by Entergy and the NRC Staff to demonstrate the appropriateness of the NRC Staff issuing the FSEIS before completion of consultation, is inapposite given the facts of this proceeding.
229 Id. at 11-13, 19-20.
270  Similarly, Riverkeeper urges the Board not to view the par tial consultation already conducted with NMFS and incorporated into the FSEIS as sufficient to satisfy NEPA and ESA because NMFS has not yet drawn conclusions regarding how renewal of the licenses of IP2 and IP3 will impact certain endangered species.
230 Id. at 14-15.
271  Riverkeeper also stresses that federal caselaw interpreting NEPA mandates the issuance of a supplemental EIS for the types of information likely to emerge from NMFS's ultimate conclusions.
231 Id. at 16-21.
272  Finally, Riverkeeper states that Entergy and the NRC Staff have mischaracterized the timeliness of RK-EC-8 because the contention challenges the comprehensiveness of all of the NRC Staff's NEPA review and how the FSEIS's conclusions inadequately incorporate the views of NMFS.
273 B. Legal Standards Governing the NRC Staff under the ESA and NEPA The NRC's final decision on a license application must consider the Final Environmental Impact Statement that is issued for a proposed action, along with any comments or 268  Id. at 19. 269  RK-EC-8 Reply at 4-5.
270  Id. at 5-6, 9-11.
271  Id. at 6-7. 272  Id. at 7-8 (citing Marsh v. Oregon Natural Res. Council, 490 U.S. 360, 372 (1989)).
273  Id. at 13-16.
supplements made to that document.
274  NEPA mandates that the NRC Staff take a "hard look" at the environmental impacts of the proposed action, which is subject to a rule of reason.
275  As part of its review of the environmental impacts of Entergy's LRA for IP2 and IP3, the NRC Staff is obliged to evaluate the "impact of refurbishment and other license-renewal-related construction activities on important plant and animal habitats" as well as "the impact of the proposed action on threatened or endangered species in accordance with the Endangered Species Act."
276  Table B-1 of 10 C.F.R. Part 51 generally expects that nuclear power plant refurbishment or continued operation will not adversely affect endangered species.
277  However, Table B-1 considers the impact to threatened or endangered species a Category 2 issue 278 requiring a site-specific review, and thus it mandates that "consultation with appropriate agencies would be needed at the time of license renewal to determine whether threatened or endangered species are present and whether they would be adversely affected."
279 274  10 C.F.R. § 51.94.
275  Southern Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site), LBP-09-07, 69 NRC 613, 631 (2009) (referencing Louisiana Energy Services, L.P. (Claiborne Enrichment Center), CLI-98-3, 47 NRC 77, 87-88 (1998); Long Island Lighting Co. (Shoreham Nuclear Power Station), ALAB-156, 6 AEC 831, 836 (1973)).
276  10 C.F.R. § 51.53(c)(3)(ii)(E); see id. § 51.71(a) ("the draft [environmental impact] statement will address [inter alia] . . . the matters specified in § . . . 51.53"); id. § 51.90 ("the NRC staff will prepare a final environmental impact statement in accordance with the requirements in § . . . 51.71 for a draft environmental impact statement").
277  10 C.F.R. Part 51, app. B, tbl. B-1.
278  As we have noted before, Category 1 issues have been resolved by the NRC in the Generic Environmental Impact Statement for License Renewal, and thus are not encompassed in the agency's review of a license renewal application and barred from litigation in adjudicatory proceedings. However, those issues classified as Category 2 issues necessitate site-specific review and are subject to litigation in adjudicatory proceedings. See LBP-08-13, 68 NRC at 67 (citing Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), CLI-01-17, 54 NRC 3, 11-12 (2001)).  


279  10 C.F.R. Part 51, app. B, tbl. B-1.
conclusions reached in the FSEIS, has not explained why minority populations would disproportionately be affected by impacts compared to the general population, and has not demonstrated that the NRC Staff has failed to reach its conclusions independently.232 The NRC Staff agrees with Entergy regarding CW-EC-3A inasmuch as it updates Clearwaters challenges to the ER to the FSEIS and objects to Clearwater raising any concerns over emergency planning.233 However, the NRC Staff characterizes Clearwaters challenges to the FSEISs no-action alternative analysis as untimely, as failing to raise a material dispute with the FSEIS, as an incorrect reading of the FSEIS, and as too vague to be admissible.234 Further, the NRC Staff describes the closed-cycle cooling aspect of CW-EC-3A as unsupported, immaterial to the NRCs licensing decision, and based on an erroneous reading of the FSEIS.235 Clearwater replies that CW-EC-3A is timely filed because Section 2.309(f)(2) permits amended contentions to be filed based on the FSEIS, even if an intervenor has not challenged similar data or conclusions in the DSEIS, and that the information giving rise to the contention was presented for the first time in the FSEIS.236 In the alternative, Clearwater asserts that it has shown good cause, pursuant to Section 2.309(c)(1), to have filed this amended contention when it did, because it could not have anticipated that Entergy would encourage various organizations to submit comments on the DSEIS, and that the NRC Staff would inadequately respond to those comments.237 232 Id. at 16-18, 21-22.
The NMFS, which is part of the Department of Commerce's National Oceanic and Atmospheric Administration, shares the administration of the consultation function of the ESA with the Fish and Wildlife Service (FWS) of the Department of the Interior.
233 NRC Staff Answer to CW-EC-3 at 8-9.
280  Generally, NMFS has jurisdiction over marine or anadromous species, while FWS has jurisdiction over freshwater and land-based animals.
234 Id. at 9-18.
281  Section 7(a)(2) of the ESA directs that:  each Federal agency shall, in consultation with and with the assistance of [NMFS], insure that any action authorized, funded, or carried out by such agency (hereinafter in this section referred to as an "agency action") is not likely to jeopardize the continued existence of any endangered species or threatened species or result in the destruction or adverse modification of habitat of such species . . . .
235 Id. at 19-21.
282  Before engaging in formal consultation with NMFS under ESA § 7(a)(2), an agency may (but does not have to) informally consult with NMFS to aid the agency in deciding whether formal consultation is required. If informal consultation results in the agency deciding, with written concurrence of NMFS, "that the action is not likely to adversely affect listed species or critical habitat, the consultation process is terminated, and no further action is necessary."
236 Amended CW-EC-3 Reply at 3-6, 9-10.
283 On the other hand, once consultation has commenced, the federal agency and the license applicant are prohibited from "mak[ing] any irreversible or irretrievable commitment of resources with respect to the agency action which has the effect of foreclosing the formulation or implementation of any reasonable and prudent alternative measures which would not violate" 280  See Nat'l Ass'n of Home Builders v. Defenders of Wildlife, 551 U.S. 644, 651 (2007); 50 C.F.R. § 402.01(b); see also Endangered Species Act of 1973 § 3, 16 U.S.C. § 1532(15).
237 Id. at 6-9.
281  See Gifford Pinchot Task Force v. U.S. Fish & Wildlife Serv., 378 F.3d 1059, 1063 n.1 (9th Cir. 2004).
282  16 U.S.C. § 1536(a)(2); see 50 C.F.R. § 402.01.
283  50 C.F.R. § 402.13(a).
ESA § 7(a)(2).
284  To comply with ESA § 7, "each federal agency shall . . . request of [NMFS] information whether any species which is listed or proposed to be listed may be present in the area of such proposed action."
285  If NMFS advises in the affirmative that there may be species that are listed or proposed to be listed in the area of the proposed action, then the agency must "conduct a biological assessment [BA] for the purpose of identifying any endangered species or threatened species which is likely to be affected by such action."
286  The ESA permits the BA to "be undertaken as part of a Federal agency's compliance with section 102 of [NEPA]."
287  If the BA concludes that the proposed action will affect a listed species, then formal consultation with NMFS is necessary.
288 After consultation has concluded, NMFS must present to the agency and the applicant its written Biological Opinion (BiOp), which contains a summary of the information on which the opinion is based, detailing how the agency action affects the species or its critical habitat. If jeopardy or adverse modification is found, [NMFS] shall suggest those reasonable and prudent alternatives which [it] believes would not violate [ESA § 7(a)(2)] and can be taken by the Federal agency or applicant in implementing the agency action.
289 


284  16 U.S.C. § 1536(d); 50 C.F.R. § 402.09; see also Bays' Legal Fund v. Browner , 828 F. Supp. 102, 112 (D. Mass. 1993) (holding that the ESA "calls for some judicial discretion to determine whether an agency's decision to proceed with action, prior to the completion of formal consultation with the NMFS, could have 'the effect of foreclosing' alternatives and could, therefore, be considered arbitrary and capricious.").
Further, Clearwater argues that CW-EC-3A raises a material issue in this proceeding because its criticisms of the FSEISs no-action and closed-cycle cooling alternative analyses show that the NRC Staff has failed to reach any conclusions of the impact of these alternatives on EJ populations.238 According to Clearwater, given that the FSEIS does not appropriately respond to those comments on this issue made in response to the DSEIS and provide the NRC Staffs own information to address them, Entergys manipulat[ion of] the comment process led the NRC Staff to insufficiently analyze the adverse impacts from the no-action and closed-cycle cooling alternative to the same EJ populations alleged to be represented by these commenters.239 Finally, Clearwater contends that CW-EC-3A does not challenge Entergys emergency planning. Instead, Clearwater states that it is attacking the NRC Staffs failure to analyze mitigation for the disparate impacts of the proposed action on EJ populations.240 These populations include not only the Sing Sing prisoners mentioned by the Board in LBP-08-13, but also other EJ populations within 50 miles of Indian Point241 in pre-schools, nursing homes, shelters, hospitals, and minority and low-income residents in the region who lack access to private transportation.242 B.     Board Decision We admit those portions of CW-EC-3A that seek to update the contention as originally admitted. However, we reject the remainder of the amended contentions on timeliness and materiality grounds.
285  16 U.S.C. § 1536(c)(1); 50 C.F.R. § 402.06(a).
238 Id. at 10-12.
286  16 U.S.C. § 1536(c)(1).
239 Id. at 12-16.
287  Id.; 50 C.F.R. § 402.06(a).
240 Id. at 18.
288  50 C.F.R. § 402.14(a). However, formal consultation may be excused if the agency, with the concurrence of NMFS, finds that the proposed action will not likely affect the listed species. Id.
241 Clearwater references the recent events at the Fukushima Daiichi Nuclear Power Plant and the NRCs recommendation that populations within fifty miles of that facility be evacuated.
§ 402.14(b)(1).
242 Id. at 18-19.
289  16 U.S.C. § 1536(b)(3)(A).
C. Chronological Background of the NRC Staff's ESA Review in this Proceeding The NRC Staff sent a letter to NMFS in August 2007, inquiring whether there were any endangered or threatened species in proximity to IP2 and IP3 that could be affected by the reactors' relicensing. In October 2007, NMFS responded that it surmised the shortnose sturgeon, an endangered species, and the Atlantic sturgeon, a candidate for threatened or endangered status, were indeed in the vicinity of the reactors and could be affected by their relicensing.
290  The NRC Staff's DSEIS, issued in December 2008, concluded that both species of sturgeon could be adversely affected by the relicensing of IP2 and IP3 and that such impacts could be small to large, but stated that it needed more information before it would be able to define the extent of such impacts.
291  The NRC Staff also included with its DSEIS a specific BA for the shortnose sturgeon due to its status as a listed endangered species.
292 Because of these expected impacts, the NRC Staff endeavored to initiate formal consultation with NMFS later that month, but in February 2009 that effort was delayed by NMFS, which sought more information about impacts to the shortnose sturgeon from the NRC Staff before agreeing to commence formal consultation.
293  On December 3, 2010, the NRC Staff issued its FSEIS, 294 which ostensibly analyzed the impacts to both shortnose and Atlantic 290  See FSEIS at 4-57.
291  See Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 38, Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Draft Report for Comment, NUREG-1437 (Dec. 2008) at 4-51 to 4-52 [hereinafter DSEIS].
292  See id., app. E, Biological Assessment of the Potential Effects on Federally Listed Endangered or Threatened Species from the Proposed Renewal of Indian Point Nuclear Generating Plant, Unit Nos. 2 and 3 at E-88 to E-100.  


293  See FSEIS, app. E, Letter from Mary A. Colligan, Assistant Regional Administrator for Protected Resources, United States Department of Commerce, National Oceanic and  
In order to directly challenge facts or conclusions stated in the FSEIS through timely filed new or amended contentions, Clearwater must identify significant differences between the data and conclusions in the DSEIS and the FSEIS.243 This policy is consistent with the Commissions longstanding and pervasive position that requires intervenors to challenge deficiencies at the earliest possible time.244 Having chosen not to challenge the DSEIS, Clearwater cannot now directly challenge aspects of the FSEIS that have not differed significantly from the DSEIS.245 If, however, a party made comments to the DSEIS that are not adequately addressed in the FSEIS, then the triggering event for a timely challenge would be the publication of the FSEIS. Nevertheless, in this Motion Clearwater did not identify actual deficiencies in the NRCs response to comments. Rather, it challenged the motives of commenters, an issue that is irrelevant. Regardless of the commenters motives, comments must be addressed by the NRC Staff and any challenge to the NRC Staffs response to a comment must point to errors in how the comment was resolved in the FSEIS. Clearwater, however, did not catalogue the DSEIS comments nor explain why the NRC Staffs responses to them were inadequate.246 243 10 C.F.R. § 2.309(f)(2).
244 Progress Energy Florida, Inc. (Combined License Application, Levy County Nuclear Power Plant, Units 1 and 2), CLI-10-02, 71 NRC __, __ (slip op. at 9) (Jan. 7, 2010) (citing Duke Power Co. (Catawba Nuclear Station, Units 1 and 2), CLI-83-19, 17 NRC 1041, 1050 (1983)).
245 10 C.F.R. § 2.309(f)(2).
246 See Amended CW-EC-3 at 4 (only alleging that Clearwater, Riverkeeper, and others pointed out that Section 8.2 of the DSEIS was flawed because it did not consider and analyze new information about various measures that could be taken if the no-action alternative were implemented as compared to the detrimental impact of relicensing the plant. FSEIS at A-153.
These omissions were addressed obliquely in the FSEIS, but the NRC failed to adequately address the issue. E.g. FSEIS at A-154.).


Atmospheric Administration, National Marine Fisheries Service, Northeast Region, to David J.
Part of the NRC Staffs responsibility in preparing its FSEIS is responding to comments made on the DSEIS.247 Contentions alleging that the NRC Staff has not fulfilled its obligation to take a hard look in its FSEIS at comments filed on the DSEIS can be within the scope of this proceeding pursuant to 10 C.F.R. § 2.309(f)(1)(iii). However, as we stated before, such a contention must also show why the alleged error or omission is of possible significance to the result of the proceeding, namely, some significant link between the claimed deficiency and either the health and safety of the public, or the environment.248 Clearwater asserts that the NRC Staff did not look hard enough at the potential health impacts of the no-action alternative as stated in comments on the DSEIS from groups purportedly affiliated with Entergy.249 However, the identity of those groups is irrelevant to whether the NRC Staff has given a hard look at their comments. We are not told why the comments were misleading or how the NRC Staffs analysis of them was deficient, beyond a challenge to the motives of the commenters and unsupported conclusions regarding the accuracy of the comments and the NRC Staffs assessment thereof.
Wrona, Branch Chief, U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Program, Division of License Renewal, Projects Branch 2 (Feb. 24, 2009) at E-93 to E-95.  
The purpose of the no-action alternative is for the agency to review and allow the public to understand its review of both the positive and negative impacts that would result from remaining with the status quo rather than proceeding with the proposed action.250 If Clearwaters position in CW-EC-3A was that the actual no-action alternative is more preferable than the NRC Staffs description of the no-action alternative, such a position might lead to a dispute over whether the NRC Staff has incorrectly minimized the benefits or maximized the 247 10 C.F.R. § 51.91(a); Dominion Nuclear North Anna, LLC (Early Site Permit for North Anna ESP Site), CLI-07-27, 66 NRC 215, 224 (2007).
248 LBP-08-13, 68 NRC at 62.
249 Amended CW-EC-3 at 3-8.
250 See Kilroy v. Ruckelshaus, 738 F.2d 1448, 1453 (9th Cir. 1984) (citations omitted)
(explaining the objectives of analyzing the no-action alternative).


294  See Letter from Sherwin E. Turk, Counsel for NRC Staff, to Atomic Safety and Licensing Board (Dec. 3, 2010).      sturgeon and concluded they would be small.
adverse impacts of the no-action alternative. Instead, Clearwater only asserted that the untrustworthiness of the commenters claiming to represent EJ populations could potentially impact the relicensing decision for IP2 and IP3. Moreover, Clearwater has not pointed to specific impacts potentially flowing to EJ populations in the no-action alternative that have not been addressed by the NRC Staff. Clearwater offers no critique of the NRCs analysis other than to note that it mirrors Entergys public relations slogan and suggests that the FSEIS should have treated them with great care.251 Accordingly, Clearwater has neither raised an issue that is material to the NRCs licensing decision in this proceeding pursuant to 10 C.F.R.
295  On December 10, 2010, the NRC Staff submitted its Revised BA for the shortnose sturgeon to NMFS to fulfill NMFS's request for information.
§ 2.309(f)(1)(iv) nor alleged any facts or provided expert opinions to controvert the analysis in the FSEIS. Therefore, this aspect of CW-EC-3A is inadmissible.
296  As mentioned supra , NMFS has notified the NRC Staff that it expects to complete the consultation process by mid-May 2011, and issue its BiOp by the end of June 2011.297  As of the date of this decision, the Board has not been notified that the BiOp has been issued. D. Board Decision RK-EC-8 alleges that the NRC Staff has failed to complete its formal consultation process with NMFS before issuing its final statement of the environmental impacts of the proposed action, the FSEIS, and that, without the input from NMFS, the NRC Staff was unable to take a hard look at those impacts as required by NEPA.
In addition, Clearwaters expressed concern over the closed-cycle cooling alternative is that the FSEISs analysis is both too indeterminate to be useful and entirely dependent on the assertions of Entergy.252 However, Clearwater has not provided any alleged facts or expert opinion challenging the FSEISs analysis of the closed-cycle cooling alternative. In its Motion, Clearwater states that it and others commented on the DSEIS, pointing out that the relicensing of IP2 and IP3 would have the potential for disparate impacts on potentially affected EJ populations253 But Clearwater merely reproduces concerns raised by an engineer, Bill Powers, regarding the Staffs review in the Oyster Creek license renewal proceeding, says that the NRC lacks independent judgment, and asserts (without support) that the NRC Staff did not look hard enough at the air quality impacts from pursuing replacement power costs and their possible 251 See Amended CW-EC-3 at 4, 6.
298  We disagree with the position that this contention is not timely. First, the NRC says that RK-EC-8 was filed too late because it could have challenged statements made in the NRC Staff's original BA issued in December 2008.
252 Id. at 9.
299  However, Riverkeeper had no way of knowing that the NRC Staff would not complete the ESA consultation process before issuing its FSEIS.
253 Id. at 3.
Given that this fact animates Riverkeeper's challenge to the sufficiency of the NRC Staff's hard look in the FSEIS, we find that it differs significantly from the pr eviously available NEPA documents and thus satisfies 10 C.F.R. § 2.309(f)(2). Second, while much of the NRC Staff's Answer to RK-EC-8 acknowledges Riverkeeper's challenge to the sufficiency of its FSEIS, NRC 295  See FSEIS at 4-57 to 4-60.
296  See Letter from David J. Wrona, Chief, U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, Division of License Renewal, Projects Branch 2, to Mary A. Colligan, Assistant Regional Administrator for Protected Resources, U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Marine Fisheries Service, Northeast Region (Dec. 10, 2010) (ADAMS Accession No. ML102990043).  


297  See supra note 266, Supplement to NRC Staff Answer to RK-EC-8 at 2.
effect on EJ populations.254 These vague allegations do not meet the minimal pleading requirements for an admissible contention.255 In preparing its FSEIS, the NRC Staff may rely on information submitted by an applicant such as Entergy, as long as that information is independently verified by the NRC Staff.256 Beyond its bare assertions, Clearwater has not explained why it believes the NRC Staff has failed to conduct such an independent verification in its FSEIS. Therefore, the closed-cycle cooling aspect of CW-EC-3A is inadmissible pursuant to 10 C.F.R. § 2.309(f)(1)(v) and (vi).
298  RK-EC-8 at 17-18.
In summary, Clearwaters Motion to Amend and Extend CW-EC-3 is granted in part and denied in part. CW-EC-3A is consolidated with CW-EC-3 as CW-EC-3A and is amended to read as follows:
299  See NRC Staff Answer to RK-EC-8 at 18-19.      Staff makes the crabbed argument that RK-EC-8 is late-filed because its concurrent basis in the ESA is not the subject of the Board's December 27, 2010 Order extending the time to file new contentions arising only out of the FSEIS.
Entergys environmental report and the Final Supplemental Environmental Impact Statement contain seriously flawed environmental justice analyses that do not adequately assess the impacts of relicensing Indian Point on the minority, low-income and disabled populations in the area surrounding Indian Point.257 IX.     RK-EC-8 A.      Parties Positions On February 3, 2011, Riverkeeper moved to admit Contention EC-8 (RK-EC-8),258 which contends that the FSEIS is inadequate because it does not include or consider the assessment 254 See id. at 8-10.
300  Riverkeeper's legal dispute is that the FSEIS did not take a hard look at the environmental impacts to endangered species by not including the BiOp from NMFS, and Riverkeeper's sought remedy for that deficiency is a supplementation of that FSEIS.
255 See 10 C.F.R. § 2.309(f)(1)(i).
301  We find that RK-EC-8, a challenge to the FSEIS, was timely filed pursuant to 10 C.F.R. § 2.309(f)(2). NEPA requires that a federal agency "in reaching its decision will have available, and will carefully consider, detailed information concerning significant environmental impacts."
256 See Sierra Club v. Van Antwerp, 719 F. Supp. 2d 58, 69 (D.D.C. 2010) (stating that the
302  While the NRC Staff might have incorporated information from NMFS into the preparation of its
[Army] Corps [of Engineers] may rely on information submitted by the applicant but must independently verify such information).
257 Amended CW-EC-3 at 15.
258 Riverkeeper Inc. Consolidated Motion for Leave to File a New Contention and New Contention Concerning NRC Staffs Final Supplemental Environmental Impact Statement (Feb.
3, 2011) [hereinafter RK-EC-8]. Entergy and the NRC Staff filed answers to RK-EC-8 on March 7, 2011. Applicants Answer to Riverkeeper, Inc.s Motion for Leave and New Contention Concerning the Consideration of Endangered and Threatened Aquatic Species (Mar. 7, 2011)
[hereinafter Entergy Answer to RK-EC-8]; NRC Staffs Answer to Riverkeeper, Inc.s Motion for Leave to File a New Contention, and New Contention EC-8 Concerning NRC Staffs Final


FSEIS, 303 those comments do not necessarily reflect the NMFS's final conclusions that will be in its BiOp and only when that document is issued will the NRC Staff have NMFS's complete views to consider in formulating its own recommendations regarding Entergy's LRA.
of the National Marine Fisheries Service (NMFS) regarding impacts to endangered species due to incomplete [Endangered Species Act] ESA § 7 consultation procedures.259 Riverkeeper argues that the NRC cannot grant Entergys LRA for IP2 and IP3 unless the NRC Staff issues a supplemental EIS that fully considers the outcome of the consultation process, including NMFS forthcoming biological opinion.260 Because the NRC Staff did not complete its consultation with NMFS regarding the shortnose sturgeon (an endangered species) and the Atlantic sturgeon (a candidate for listing as threatened or endangered) prior to issuing the FSEIS, Riverkeeper argues that the NRCs conclusions in the FSEIS were not fully informed by the requisite input from NMFS and thus lacked a hard look as required by NEPA.261 Riverkeeper also represents that RK-EC-8 is based on new information that differs significantly from information previously available because Riverkeeper had no way of knowing that the NRC Staff would issue its FSEIS without completing ESA consultation with NMFS.262 Entergy opposes admission of RK-EC-8, maintaining that RK-EC-8 was not timely filed to the extent it challenges the sufficiency of the NRC Staffs consultation with NMFS because Riverkeeper could have brought this challenge when that consultation began, or earlier in the consultation process before the FSEIS was issued.263 Even if Riverkeepers petition is deemed timely, Entergy argues that RK-EC-8 does not raise a genuine dispute on a material issue of law or fact because (1) there is no requirement for the NRC to complete its ESA § 7 consultation Supplemental Environmental Impact Statement (Mar. 7, 2011) [hereinafter NRC Staff Answer to RK-EC-8]. Riverkeeper replied on March 14, 2011. Riverkeeper Inc. Combined Reply to NRC Staff and Entergy Answers to Riverkeepers Motion for Leave to File a New Contention and New Contention Concerning NRC Staffs Final Supplemental Environmental Impact Statement (Mar.
304  It is this Board's view that completion of that consultation process is necessary to the NRC Staff's fulfillment of its obligations under the ESA and NEPA. NMFS's BiOp will aid the agency in making its licensing decision in this proceeding. Without receipt and consideration of 300  See id. at 19. 301  RK-EC-8 at 1, 17-18.
14, 2011) [hereinafter RK-EC-8 Reply].
302  Robinson v. Methow Valley Citizens Council, 490 U.S. 332, 349 (1989).
259 RK-EC-8 at 1.
303  FSEIS at 4-57.
260 Id.
304  See Tennessee Valley Auth. (Hartsville Nuclear Plant, Units 1A, 2A, 1B, and 2B), ALAB-463, 7 NRC 341, 363-64 (1978) (citing Nat'l Wildlife Fed'n v. Coleman, 529 F.2d 359, 371 (5th Cir.), cert. denied, 429 U.S. 979 (1976) (explaining that although the Commission is ultimately responsible for deciding both whether a proposed agency action does jeopardize endangered species and whether to proceed with the proposed action, a licensing board may not assume that NMFS's BiOp will necessarily come to the same conclusion as the NRC Staff before consultation with NMFS is complete).
261 See id. at 7 n.6, 12, 17-18.
that input from NMFS, the NRC Staff arguably has not taken the requisite hard look at this issue. The FSEIS itself does not beget the final license issuance in this proceeding and therefore its mere issuance without completion of consultation does not necessarily run afoul of the ESA's prohibition on the agency's "mak[ing] any irreversible or irretrievable commitment of resources with respect to the agency action which has the effect of foreclosing the formulation or implementation of any reasonable and prudent alternative measures" to avoid the likely jeopardizing of the continued existence of any endangered or threatened species or its
262 See id. at 18-19.
263 Entergy Answer to RK-EC-8 at 13-14.


habitat.305  Nonetheless, the FSEIS's essential "final analysis and a final recommendation on the action to be taken" 306 must play a fundamental role in the agency's decision in this proceeding on Entergy's LRA.
with NMFS prior to issuing the FSEIS, (2) the NRC Staff need not supplement the FSEIS once the ESA consultation process is complete, and (3) the NRC Staff has not violated any time restrictions in the preparation of its Biological Assessment (BA).264 The NRC Staff also opposes admission of RK-EC-8. First, the NRC Staff represents that it has complied with the ESA even though it issued the FSEIS before completion of consultation with NMFS because [i]ssuance of the FSEIS does not cause or amount to an irreversible or irretrievable commitment of resources, and the procedure of issuing the FSEIS before completion of ESA § 7 consultation has been followed by the NRC Staff in another license renewal proceeding.265 Thus, the NRC Staff, like Entergy, reasons that RK-EC-8 raises no genuine dispute because there is nothing in the ESA or NEPA expressly requiring the NRC Staff to complete its consultation with NMFS before issuance of the FSEIS.266 Further, the NRC Staff claims that RK-EC-8 is untimely because it challenges information in the NRC Staffs Revised BA and thus could have been raised when the NRC Staff issued its Original BA and DSEIS in December 2008.267 Likewise, the NRC Staff also considers RK-EC-8 untimely to the extent it challenges the NRC Staffs Revised BA, which was issued in December 2010 after the 264 Id. at 14-20.
307 Specifically, Riverkeeper has raised a question of whether the existing FSEIS fulfills the NRC's hard look obligations under NEPA. Moreover, while the remedy Riverkeeper requests is the supplementation of the FSEIS, 308 a resolution of the question whether a supplemental FSEIS is necessary is a matter for adjudication. Therefore, Riverkeeper's allegation that the NRC Staff's failure to take into account NMFS's BiOp violates the agency's duty to conduct a hard look at the environmental impacts of the proposed action raises a genuine dispute of law pursuant to 10 C.F.R. § 2.309(f)(1)(vi). Riverkeeper has alleged sufficient facts under 10 C.F.R. § 2.309(f)(1)(v), and provided an adequate factual basis under 10 C.F.R. § 2.309(f)(1)(ii), to support this contention: namely, 305  See 16 U.S.C. § 1536(d).
265 NRC Staff Answer to RK-EC-8 at 11.
306  10 C.F.R. § 51.91(d).
266 Id. at 12-15. Shortly after Riverkeepers Reply was filed, the NRC Staff filed a supplement to its Answer to RK-EC-8. This supplement announced that the expected completion date of formal consultations has been extended to May 15, 2011, and the expected issuance date of NMFS Biological Opinion has been extended to June 29, 2011, unless further extended.
307  See id. § 51.94.
Supplement to NRC Staffs Answer to Riverkeeper, Inc.s Motion for Leave to File a New Contention, and New Contention EC-8 Concerning NRC Staffs Final Supplemental Environmental Impact Statement (Mar. 16, 2011) at 2 [hereinafter Supplement to NRC Staff Answer to RK-EC-8]. As of the date of this decision, the Board has not been notified that the Biological Opinion has been issued.
308  See RK-EC-8 at 1.
267 Id. at 17-19.
the contents of the FSEIS and the NRC Staff's BA.
309  What is more, because the NRC Staff's environmental review of Entergy's LRA for IP2 and IP3 must include a site-specific review of endangered or threatened species affected by Entergy's LRA as well as consultation with NMFS, 310 that review is within the scope of this license renewal proceeding pursuant to 10 C.F.R. § 2.309(f)(1)(iii). Likewise, whether the NRC Staff has taken a hard look at the environmental impacts of the proposed action under the agency's NEPA-implementing regulations is material to the NRC's licensing de cision in this proceeding pursuant to 10 C.F.R. § 2.309(f)(1)(iv). Therefore, we find RK-EC-8 admissible under 10 C.F.R. § 2.309(f)(1).
311  X. CONCLUSION For the foregoing reasons, we:
A. Grant New York's Motion to admit NYS-12C and consolidate it with NYS-12/12A/12B hereinafter as Consolidated NYS-12C; B. Grant New York's Motion to admit NYS-17B as limited and consolidate it with NYS-17/17A hereinafter as Consolidated NYS-17B; de facto deny New York's Petition for Waiver and Exemption Request from 10 C.F.R. § 51.23 finding it unnecessary to rule thereon;  C. Grant New York's Motion to add additional bases to NYS-25; D. Grant New York's Motion to Admit NYS-37 as limited by this Memorandum and Order and consolidate it with NYS-9/33 hereinafter as Consolidated NYS-37; 309  See RK-EC-8 at 16-17; see also Entergy Answer to RK-EC-8 at 3-6; NRC Staff Answer to RK-EC-8 at 9-10.
310  See 10 C.F.R. Part 51, app. B, tbl. B-1.
311  Entergy is correct, however, that its Application to renew the licenses of reactors already built does not qualify as a "major construction ac tivity" necessitating the NRC Staff's preparation of a BA and the time constraints imposed by the ESA for preparation of a BA. See 16 U.S.C. § 1536(c)(1); 50 C.F.R. § 402.12(b)(1); Entergy Answer to RK-EC-8 at 19-20. Thus, to the extent RK-EC-8 challenges the pace the NRC Staff has taken to prepare its BA, that challenge is not material to the NRC Staff's licensing decision in this proceeding pursuant to 10 C.F.R.  
§ 2.309(f)(1)(iv).
E. Grant Riverkeeper's and Clearwater's request to apply RK-EC-3/CW-EC-1 to the FSEIS; F. Deny Riverkeeper's and Clearwater's Motion to Admit Contentions CW-EC-8/RK-EC-6, CW-SC-2/RK-TC-3, CW-EC-9/RK-EC-7, and CW-SC-3/RK-TC-4; Deny Riverkeeper's and Clearwater's Petition for Waiver of 10 C.F.R. § 51.23; and Deny Entergy's Motion to Strike Portions of Clearwater's and Riverkeeper's Reply Regarding CW-EC-8/RK-EC-6, CW-SC-2/RK-TC-3, CW-EC-9/RK-EC-7, and CW-SC-3/RK-TC-4; G. Grant Clearwater's Motion to Amend CW-EC-3 as limited to those proposed amendments that update the contention as originally admitted hereinafter as CW-EC-3A; and  H. Grant Riverkeeper's Motion to Admit RK-EC-8.  


This Memorandum and Order is subject to interlocutory review in accordance with the provisions of 10 C.F.R. § 2.341(f)(2). A petition for review that meets the requirements of section 2.341(f)(2) must be filed within fifteen (15) days of service of this Memorandum and Order.312 It is so ORDERED.
FSEIS, because the Board only extended the normal thirty-day window to file new contentions arising under the FSEIS, not for new contentions arising under the Revised BA.268 Riverkeeper replies that the final NEPA document issued by the NRC Staff should have considered the results of the ESA § 7 consultation process.269 Likewise, Riverkeeper emphasizes that the precedent (both NRC Staff practice and federal caselaw), cited by Entergy and the NRC Staff to demonstrate the appropriateness of the NRC Staff issuing the FSEIS before completion of consultation, is inapposite given the facts of this proceeding.270 Similarly, Riverkeeper urges the Board not to view the partial consultation already conducted with NMFS and incorporated into the FSEIS as sufficient to satisfy NEPA and ESA because NMFS has not yet drawn conclusions regarding how renewal of the licenses of IP2 and IP3 will impact certain endangered species.271 Riverkeeper also stresses that federal caselaw interpreting NEPA mandates the issuance of a supplemental EIS for the types of information likely to emerge from NMFSs ultimate conclusions.272 Finally, Riverkeeper states that Entergy and the NRC Staff have mischaracterized the timeliness of RK-EC-8 because the contention challenges the comprehensiveness of all of the NRC Staffs NEPA review and how the FSEISs conclusions inadequately incorporate the views of NMFS.273 B.      Legal Standards Governing the NRC Staff under the ESA and NEPA The NRCs final decision on a license application must consider the Final Environmental Impact Statement that is issued for a proposed action, along with any comments or 268 Id. at 19.
THE ATOMIC SAFETY AND LICENSING BOARD 313
269 RK-EC-8 Reply at 4-5.
___________________________
270 Id. at 5-6, 9-11.
271 Id. at 6-7.
272 Id. at 7-8 (citing Marsh v. Oregon Natural Res. Council, 490 U.S. 360, 372 (1989)).
273 Id. at 13-16.


Lawrence G. McDade, Chairman ADMINISTRATIVE JUDGE
supplements made to that document.274 NEPA mandates that the NRC Staff take a hard look at the environmental impacts of the proposed action, which is subject to a rule of reason.275 As part of its review of the environmental impacts of Entergys LRA for IP2 and IP3, the NRC Staff is obliged to evaluate the impact of refurbishment and other license-renewal-related construction activities on important plant and animal habitats as well as the impact of the proposed action on threatened or endangered species in accordance with the Endangered Species Act.276 Table B-1 of 10 C.F.R. Part 51 generally expects that nuclear power plant refurbishment or continued operation will not adversely affect endangered species.277 However, Table B-1 considers the impact to threatened or endangered species a Category 2 issue278 requiring a site-specific review, and thus it mandates that consultation with appropriate agencies would be needed at the time of license renewal to determine whether threatened or endangered species are present and whether they would be adversely affected.279 274 10 C.F.R. § 51.94.
275 Southern Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site), LBP-09-07, 69 NRC 613, 631 (2009) (referencing Louisiana Energy Services, L.P. (Claiborne Enrichment Center), CLI-98-3, 47 NRC 77, 87-88 (1998); Long Island Lighting Co. (Shoreham Nuclear Power Station), ALAB-156, 6 AEC 831, 836 (1973)).
276 10 C.F.R. § 51.53(c)(3)(ii)(E); see id. § 51.71(a) (the draft [environmental impact] statement will address [inter alia] . . . the matters specified in § . . . 51.53); id. § 51.90 (the NRC staff will prepare a final environmental impact statement in accordance with the requirements in
§ . . . 51.71 for a draft environmental impact statement).
277 10 C.F.R. Part 51, app. B, tbl. B-1.
278 As we have noted before, Category 1 issues have been resolved by the NRC in the Generic Environmental Impact Statement for License Renewal, and thus are not encompassed in the agencys review of a license renewal application and barred from litigation in adjudicatory proceedings. However, those issues classified as Category 2 issues necessitate site-specific review and are subject to litigation in adjudicatory proceedings. See LBP-08-13, 68 NRC at 67 (citing Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), CLI-01-17, 54 NRC 3, 11-12 (2001)).
279 10 C.F.R. Part 51, app. B, tbl. B-1.


___________________________
The NMFS, which is part of the Department of Commerces National Oceanic and Atmospheric Administration, shares the administration of the consultation function of the ESA with the Fish and Wildlife Service (FWS) of the Department of the Interior.280 Generally, NMFS has jurisdiction over marine or anadromous species, while FWS has jurisdiction over freshwater and land-based animals.281 Section 7(a)(2) of the ESA directs that:
Dr. Kaye D. Lathrop ADMINISTRATIVE JUDGE
each Federal agency shall, in consultation with and with the assistance of
___________________________
[NMFS], insure that any action authorized, funded, or carried out by such agency (hereinafter in this section referred to as an agency action) is not likely to jeopardize the continued existence of any endangered species or threatened species or result in the destruction or adverse modification of habitat of such species . . . .282 Before engaging in formal consultation with NMFS under ESA § 7(a)(2), an agency may (but does not have to) informally consult with NMFS to aid the agency in deciding whether formal consultation is required. If informal consultation results in the agency deciding, with written concurrence of NMFS, that the action is not likely to adversely affect listed species or critical habitat, the consultation process is terminated, and no further action is necessary.283 On the other hand, once consultation has commenced, the federal agency and the license applicant are prohibited from mak[ing] any irreversible or irretrievable commitment of resources with respect to the agency action which has the effect of foreclosing the formulation or implementation of any reasonable and prudent alternative measures which would not violate 280 See Natl Assn of Home Builders v. Defenders of Wildlife, 551 U.S. 644, 651 (2007); 50 C.F.R. § 402.01(b); see also Endangered Species Act of 1973 § 3, 16 U.S.C. § 1532(15).
281 See Gifford Pinchot Task Force v. U.S. Fish & Wildlife Serv., 378 F.3d 1059, 1063 n.1 (9th Cir. 2004).
282 16 U.S.C. § 1536(a)(2); see 50 C.F.R. § 402.01.
283 50 C.F.R. § 402.13(a).


Dr. Richard E. Wardwell ADMINISTRATIVE JUDGE
ESA § 7(a)(2).284 To comply with ESA § 7, each federal agency shall . . . request of [NMFS]
information whether any species which is listed or proposed to be listed may be present in the area of such proposed action.285 If NMFS advises in the affirmative that there may be species that are listed or proposed to be listed in the area of the proposed action, then the agency must conduct a biological assessment [BA] for the purpose of identifying any endangered species or threatened species which is likely to be affected by such action.286 The ESA permits the BA to be undertaken as part of a Federal agencys compliance with section 102 of [NEPA].287 If the BA concludes that the proposed action will affect a listed species, then formal consultation with NMFS is necessary.288 After consultation has concluded, NMFS must present to the agency and the applicant its written Biological Opinion (BiOp), which contains a summary of the information on which the opinion is based, detailing how the agency action affects the species or its critical habitat. If jeopardy or adverse modification is found, [NMFS] shall suggest those reasonable and prudent alternatives which [it] believes would not violate [ESA § 7(a)(2)] and can be taken by the Federal agency or applicant in implementing the agency action.289 284 16 U.S.C. § 1536(d); 50 C.F.R. § 402.09; see also Bays Legal Fund v. Browner, 828 F. Supp. 102, 112 (D. Mass. 1993) (holding that the ESA calls for some judicial discretion to determine whether an agencys decision to proceed with action, prior to the completion of formal consultation with the NMFS, could have the effect of foreclosing alternatives and could, therefore, be considered arbitrary and capricious.).
285 16 U.S.C. § 1536(c)(1); 50 C.F.R. § 402.06(a).
286 16 U.S.C. § 1536(c)(1).
287 Id.; 50 C.F.R. § 402.06(a).
288 50 C.F.R. § 402.14(a). However, formal consultation may be excused if the agency, with the concurrence of NMFS, finds that the proposed action will not likely affect the listed species. Id.
§ 402.14(b)(1).
289 16 U.S.C. § 1536(b)(3)(A).


Rockville, Maryland
C.      Chronological Background of the NRC Staffs ESA Review in this Proceeding The NRC Staff sent a letter to NMFS in August 2007, inquiring whether there were any endangered or threatened species in proximity to IP2 and IP3 that could be affected by the reactors relicensing. In October 2007, NMFS responded that it surmised the shortnose sturgeon, an endangered species, and the Atlantic sturgeon, a candidate for threatened or endangered status, were indeed in the vicinity of the reactors and could be affected by their relicensing.290 The NRC Staffs DSEIS, issued in December 2008, concluded that both species of sturgeon could be adversely affected by the relicensing of IP2 and IP3 and that such impacts could be small to large, but stated that it needed more information before it would be able to define the extent of such impacts.291 The NRC Staff also included with its DSEIS a specific BA for the shortnose sturgeon due to its status as a listed endangered species.292 Because of these expected impacts, the NRC Staff endeavored to initiate formal consultation with NMFS later that month, but in February 2009 that effort was delayed by NMFS, which sought more information about impacts to the shortnose sturgeon from the NRC Staff before agreeing to commence formal consultation.293 On December 3, 2010, the NRC Staff issued its FSEIS,294 which ostensibly analyzed the impacts to both shortnose and Atlantic 290 See FSEIS at 4-57.
291 See Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 38, Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Draft Report for Comment, NUREG-1437 (Dec. 2008) at 4-51 to 4-52 [hereinafter DSEIS].
292 See id., app. E, Biological Assessment of the Potential Effects on Federally Listed Endangered or Threatened Species from the Proposed Renewal of Indian Point Nuclear Generating Plant, Unit Nos. 2 and 3 at E-88 to E-100.
293 See FSEIS, app. E, Letter from Mary A. Colligan, Assistant Regional Administrator for Protected Resources, United States Department of Commerce, National Oceanic and Atmospheric Administration, National Marine Fisheries Service, Northeast Region, to David J.
Wrona, Branch Chief, U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Program, Division of License Renewal, Projects Branch 2 (Feb. 24, 2009) at E-93 to E-95.
294 See Letter from Sherwin E. Turk, Counsel for NRC Staff, to Atomic Safety and Licensing Board (Dec. 3, 2010).


July 6, 2011 312  See 10 C.F.R. § 2.341(b)(1).
sturgeon and concluded they would be small.295 On December 10, 2010, the NRC Staff submitted its Revised BA for the shortnose sturgeon to NMFS to fulfill NMFSs request for information.296 As mentioned supra, NMFS has notified the NRC Staff that it expects to complete the consultation process by mid-May 2011, and issue its BiOp by the end of June 2011.297 As of the date of this decision, the Board has not been notified that the BiOp has been issued.
313  Copies of this Memorandum and Order were sent this date by Internet e-mail to: (1) Counsel for the NRC Staff; (2) Counsel for Entergy; (3) Co unsel for the State of New York; (4) Counsel for Riverkeeper, Inc.; (5) Manna Jo Green, the Representative for Clearwater; (6) Counsel for the State of Connecticut; (7) Counsel for Westchester County; (8) Counsel for the Town of Cortlandt; (9) Mayor Sean Murray, the Representative for the Village of Buchanan; and (10) Michael J. Delaney, counsel for the City of New York.
D.      Board Decision RK-EC-8 alleges that the NRC Staff has failed to complete its formal consultation process with NMFS before issuing its final statement of the environmental impacts of the proposed action, the FSEIS, and that, without the input from NMFS, the NRC Staff was unable to take a hard look at those impacts as required by NEPA.298 We disagree with the position that this contention is not timely. First, the NRC says that RK-EC-8 was filed too late because it could have challenged statements made in the NRC Staffs original BA issued in December 2008.299 However, Riverkeeper had no way of knowing that the NRC Staff would not complete the ESA consultation process before issuing its FSEIS.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )
Given that this fact animates Riverkeepers challenge to the sufficiency of the NRC Staffs hard look in the FSEIS, we find that it differs significantly from the previously available NEPA documents and thus satisfies 10 C.F.R. § 2.309(f)(2). Second, while much of the NRC Staffs Answer to RK-EC-8 acknowledges Riverkeepers challenge to the sufficiency of its FSEIS, NRC 295 See FSEIS at 4-57 to 4-60.
)
296 See Letter from David J. Wrona, Chief, U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, Division of License Renewal, Projects Branch 2, to Mary A.
ENTERGY NUCLEAR OPERATIONS, INC. )  Docket Nos. 50-247-LR
Colligan, Assistant Regional Administrator for Protected Resources, U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Marine Fisheries Service, Northeast Region (Dec. 10, 2010) (ADAMS Accession No. ML102990043).
) 50-286-LR
297 See supra note 266, Supplement to NRC Staff Answer to RK-EC-8 at 2.
) (Indian Point Nuclear Generating Station, )            Units 2 and 3)  )
298 RK-EC-8 at 17-18.
299 See NRC Staff Answer to RK-EC-8 at 18-19.


CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing LB MEMORANDUM AND ORDER (RULING ON PENDING MOTIONS FOR LEAVE TO FILE NEW AND AMENDED CONTENTIONS) has been served upon the following persons by U.S. mail, first class, or through NRC internal distribution.  
Staff makes the crabbed argument that RK-EC-8 is late-filed because its concurrent basis in the ESA is not the subject of the Boards December 27, 2010 Order extending the time to file new contentions arising only out of the FSEIS.300 Riverkeepers legal dispute is that the FSEIS did not take a hard look at the environmental impacts to endangered species by not including the BiOp from NMFS, and Riverkeepers sought remedy for that deficiency is a supplementation of that FSEIS.301 We find that RK-EC-8, a challenge to the FSEIS, was timely filed pursuant to 10 C.F.R. § 2.309(f)(2).
NEPA requires that a federal agency in reaching its decision will have available, and will carefully consider, detailed information concerning significant environmental impacts.302 While the NRC Staff might have incorporated information from NMFS into the preparation of its FSEIS,303 those comments do not necessarily reflect the NMFSs final conclusions that will be in its BiOp and only when that document is issued will the NRC Staff have NMFSs complete views to consider in formulating its own recommendations regarding Entergys LRA.304 It is this Boards view that completion of that consultation process is necessary to the NRC Staffs fulfillment of its obligations under the ESA and NEPA. NMFSs BiOp will aid the agency in making its licensing decision in this proceeding. Without receipt and consideration of 300 See id. at 19.
301 RK-EC-8 at 1, 17-18.
302 Robinson v. Methow Valley Citizens Council, 490 U.S. 332, 349 (1989).
303 FSEIS at 4-57.
304 See Tennessee Valley Auth. (Hartsville Nuclear Plant, Units 1A, 2A, 1B, and 2B), ALAB-463, 7 NRC 341, 363-64 (1978) (citing Natl Wildlife Fedn v. Coleman, 529 F.2d 359, 371 (5th Cir.), cert. denied, 429 U.S. 979 (1976) (explaining that although the Commission is ultimately responsible for deciding both whether a proposed agency action does jeopardize endangered species and whether to proceed with the proposed action, a licensing board may not assume that NMFSs BiOp will necessarily come to the same conclusion as the NRC Staff before consultation with NMFS is complete).


Office of Commission Appellate Adjudication Mail Stop O-7H4M U.S. Nuclear Regulatory Commission Washington, DC  20555-0001
that input from NMFS, the NRC Staff arguably has not taken the requisite hard look at this issue.
The FSEIS itself does not beget the final license issuance in this proceeding and therefore its mere issuance without completion of consultation does not necessarily run afoul of the ESAs prohibition on the agencys mak[ing] any irreversible or irretrievable commitment of resources with respect to the agency action which has the effect of foreclosing the formulation or implementation of any reasonable and prudent alternative measures to avoid the likely jeopardizing of the continued existence of any endangered or threatened species or its habitat.305 Nonetheless, the FSEISs essential final analysis and a final recommendation on the action to be taken306 must play a fundamental role in the agencys decision in this proceeding on Entergys LRA.307 Specifically, Riverkeeper has raised a question of whether the existing FSEIS fulfills the NRCs hard look obligations under NEPA. Moreover, while the remedy Riverkeeper requests is the supplementation of the FSEIS,308 a resolution of the question whether a supplemental FSEIS is necessary is a matter for adjudication. Therefore, Riverkeepers allegation that the NRC Staffs failure to take into account NMFSs BiOp violates the agencys duty to conduct a hard look at the environmental impacts of the proposed action raises a genuine dispute of law pursuant to 10 C.F.R. § 2.309(f)(1)(vi).
Riverkeeper has alleged sufficient facts under 10 C.F.R. § 2.309(f)(1)(v), and provided an adequate factual basis under 10 C.F.R. § 2.309(f)(1)(ii), to support this contention: namely, 305 See 16 U.S.C. § 1536(d).
306 10 C.F.R. § 51.91(d).
307 See id. § 51.94.
308 See RK-EC-8 at 1.


U.S. Nuclear Regulatory Commission Office of the Secretary of the Commission Mail Stop O-16C1 Washington, DC  20555-0001
the contents of the FSEIS and the NRC Staffs BA.309 What is more, because the NRC Staffs environmental review of Entergys LRA for IP2 and IP3 must include a site-specific review of endangered or threatened species affected by Entergys LRA as well as consultation with NMFS,310 that review is within the scope of this license renewal proceeding pursuant to 10 C.F.R. § 2.309(f)(1)(iii). Likewise, whether the NRC Staff has taken a hard look at the environmental impacts of the proposed action under the agencys NEPA-implementing regulations is material to the NRCs licensing decision in this proceeding pursuant to 10 C.F.R.
§ 2.309(f)(1)(iv). Therefore, we find RK-EC-8 admissible under 10 C.F.R. § 2.309(f)(1).311 X.      CONCLUSION For the foregoing reasons, we:
A.      Grant New Yorks Motion to admit NYS-12C and consolidate it with NYS-12/12A/12B hereinafter as Consolidated NYS-12C; B.      Grant New Yorks Motion to admit NYS-17B as limited and consolidate it with NYS-17/17A hereinafter as Consolidated NYS-17B; de facto deny New Yorks Petition for Waiver and Exemption Request from 10 C.F.R. § 51.23 finding it unnecessary to rule thereon; C.      Grant New Yorks Motion to add additional bases to NYS-25; D.      Grant New Yorks Motion to Admit NYS-37 as limited by this Memorandum and Order and consolidate it with NYS-9/33 hereinafter as Consolidated NYS-37; 309 See RK-EC-8 at 16-17; see also Entergy Answer to RK-EC-8 at 3-6; NRC Staff Answer to RK-EC-8 at 9-10.
310 See 10 C.F.R. Part 51, app. B, tbl. B-1.
311 Entergy is correct, however, that its Application to renew the licenses of reactors already built does not qualify as a major construction activity necessitating the NRC Staffs preparation of a BA and the time constraints imposed by the ESA for preparation of a BA. See 16 U.S.C.
§ 1536(c)(1); 50 C.F.R. § 402.12(b)(1); Entergy Answer to RK-EC-8 at 19-20. Thus, to the extent RK-EC-8 challenges the pace the NRC Staff has taken to prepare its BA, that challenge is not material to the NRC Staffs licensing decision in this proceeding pursuant to 10 C.F.R.
§ 2.309(f)(1)(iv).


U.S. Nuclear Regulatory Commission. Atomic Safety and Licensing Board Panel
E. Grant Riverkeepers and Clearwaters request to apply RK-EC-3/CW-EC-1 to the FSEIS; F. Deny Riverkeepers and Clearwaters Motion to Admit Contentions CW-EC-8/RK-EC-6, CW-SC-2/RK-TC-3, CW-EC-9/RK-EC-7, and CW-SC-3/RK-TC-4; Deny Riverkeepers and Clearwaters Petition for Waiver of 10 C.F.R. § 51.23; and Deny Entergys Motion to Strike Portions of Clearwaters and Riverkeepers Reply Regarding CW-EC-8/RK-EC-6, CW-SC-2/RK-TC-3, CW-EC-9/RK-EC-7, and CW-SC-3/RK-TC-4; G. Grant Clearwaters Motion to Amend CW-EC-3 as limited to those proposed amendments that update the contention as originally admitted hereinafter as CW-EC-3A; and H. Grant Riverkeepers Motion to Admit RK-EC-8.


Mail Stop T-3F23 Washington, DC  20555-0001
This Memorandum and Order is subject to interlocutory review in accordance with the provisions of 10 C.F.R. § 2.341(f)(2). A petition for review that meets the requirements of section 2.341(f)(2) must be filed within fifteen (15) days of service of this Memorandum and Order.312 It is so ORDERED.
 
THE ATOMIC SAFETY AND LICENSING BOARD313
Administrative Judge
                                                  /RA/
 
Lawrence G. McDade, Chairman ADMINISTRATIVE JUDGE
Lawrence G. McDade, Chair
                                                  /RA/
 
Dr. Kaye D. Lathrop ADMINISTRATIVE JUDGE
Administrative Judge Richard E. Wardwell
                                                    /RA/
 
Dr. Richard E. Wardwell ADMINISTRATIVE JUDGE Rockville, Maryland July 6, 2011 312 See 10 C.F.R. § 2.341(b)(1).
Administrative Judge Kaye D. Lathrop  
313 Copies of this Memorandum and Order were sent this date by Internet e-mail to: (1) Counsel for the NRC Staff; (2) Counsel for Entergy; (3) Counsel for the State of New York; (4) Counsel for Riverkeeper, Inc.; (5) Manna Jo Green, the Representative for Clearwater; (6) Counsel for the State of Connecticut; (7) Counsel for Westchester County; (8) Counsel for the Town of Cortlandt; (9) Mayor Sean Murray, the Representative for the Village of Buchanan; and (10) Michael J. Delaney, counsel for the City of New York.
 
190 Cedar Lane E.
Ridgway, CO  81432
 
Joshua A. Kirstein, Law Clerk
 
U.S. Nuclear Regulatory Commission Office of the General Counsel
 
Mail Stop O-15D21 Washington, DC  20555-0001 Sherwin E. Turk, Esq.
 
Beth N. Mizuno, Esq.
David E. Roth, Esq.  
 
Brian Harris, Esq. Andrea Z. Jones, Esq.
Karl Farrar, Esq.
 
Brian Newell, Paralegal
 
Docket Nos. 50-247-LR and 50-286-LR LB MEMORANDUM AND ORDER (RULING ON PENDING MOTIONS FOR LEAVE TO FILE NEW AND AMENDED CONTENTIONS) 2  William C. Dennis, Esq. Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Andrew M. Cuomo, Attorney General  John J. Sipos, Assistant Attorney General Janice A. Dean Assistant Attorney General Office of the Attorney General    of the State of New York
 
The Capitol
 
State Street Albany, New York  12224 Kathryn M. Sutton, Esq. Paul M. Bessette, Esq. Martin J. O'Neill, Esq.
Counsel for Entergy Nuclear Operation, Inc.
 
Morgan, Lewis & Bockius, LLP
 
1111 Pennsylvania Avenue, NW Washington, DC  20004 Joan Leary Matthews, Esq. Senior Attorney for Special Projects New York State Department
 
of Environmental Conservation
 
625 Broadway, 14 th Floor Albany, New York 12233-5500 Michael J. Delaney, Esq. Director, Energy Regulatory Affairs NYC Department of Environmental Protection
 
59-17 Junction Boulevard Flushing, NY 11373 Robert D. Snook, Esq. Office of The Attorney General State of Connecticut 55 Elm Street P.O. Box 120 Hartford, CT  06141-0120 Arthur J. Kremer, Chairman New York  Affordable Reliable Electricity Alliance (AREA) 347 Fifth Avenue, Suite 508
 
New York, NY 10016
 
Stephen C. Filler, Board Member Hudson River Sloop Clearwater, Inc.
724 Wolcott Ave.
 
Beacon, NY  12508
 
Docket Nos. 50-247-LR and 50-286-LR LB MEMORANDUM AND ORDER (RULING ON PENDING MOTIONS FOR LEAVE TO FILE NEW AND AMENDED CONTENTIONS) 3  Sean Murray, Mayor Kevin Hay, Village Administrator Village of Buchanan Municipal Building
 
236 Tate Avenue Buchanan, NY  10511-1298 Manna Jo Greene, Environmental Director Hudson River Sloop Clearwater, Inc.
724 Wolcott Ave.
 
Beacon, New York 12508
 
Ross Gould, Board Member Hudson River Sloop Clearwater, Inc.
 
270 Route 308 Rhinebeck, NY  12572
 
Counsel for the Town of Cortlandt Thomas F. Wood, Esq. Daniel Riesel, Esq.
Jessica Steinberg, J.D.
Sive, Paget & Riesel, P.C.
 
460 Park Avenue
 
New York, NY  10022 Nancy Burton, Esq. Connecticut Residents Opposed  to Relicensing of Indian Point (CRORIP) 147 Cross Highway
 
Redding Ridge, CT 06876
 
Elise N. Zoli, Esq.
Goodwin Proctor, LLP Exchange Place
 
53 State Street Boston, MA  02109 Melissa-Jean Rotini, of counsel Assistant County Attorney
 
Office of Robert F. Meehan, Westchester County Attorney
 
148 Martine Avenue, 6 th Floor White Plains, NY 10601 FUSE USA John LeKay Heather Ellsworth Burns-DeMelo Remy Chevalier
 
Bill Thomas
 
Belinda J. Jaques 351 Dyckman Street Peekskill, New York 10566
 
Westchester Citizens' Awareness Network (WestCan), Citizens Awareness Network, (CAN), et al Susan H. Shapiro, Esq.
21 Pearlman Drive Spring Valley, NY 10977
 
Docket Nos. 50-247-LR and 50-286-LR LB MEMORANDUM AND ORDER (RULING ON PENDING MOTIONS FOR LEAVE TO FILE NEW AND AMENDED CONTENTIONS) 4  Philip Musegaas, Esq. Deborah Brancato, Esq.
Riverkeeper, Inc.
 
20 Secor Road Ossining, NY  10562 Richard L. Brodsky, Esq. Member of Assembly
 
92 nd  Assembly District, State of New York 5 West Main Street Suite 205
 
Elmsford, NY 10523


Sarah L. Wagner, Esq. Legislative Office Building, Room 422 Albany, NY 12248
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of                                  )
                                                    )
ENTERGY NUCLEAR OPERATIONS, INC.                  )                Docket Nos. 50-247-LR
                                                    )                              50-286-LR
                                                    )
(Indian Point Nuclear Generating Station,          )
Units 2 and 3)                            )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing LB MEMORANDUM AND ORDER (RULING ON PENDING MOTIONS FOR LEAVE TO FILE NEW AND AMENDED CONTENTIONS) has been served upon the following persons by U.S. mail, first class, or through NRC internal distribution.
Office of Commission Appellate                    U.S. Nuclear Regulatory Commission Adjudication                                    Office of the Secretary of the Commission Mail Stop O-7H4M                                  Mail Stop O-16C1 U.S. Nuclear Regulatory Commission                Washington, DC 20555-0001 Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission.                U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel            Office of the General Counsel Mail Stop T-3F23                                  Mail Stop O-15D21 Washington, DC 20555-0001                          Washington, DC 20555-0001 Sherwin E. Turk, Esq.
Administrative Judge                              Beth N. Mizuno, Esq.
Lawrence G. McDade, Chair                          David E. Roth, Esq.
Brian Harris, Esq.
Administrative Judge                              Andrea Z. Jones, Esq.
Richard E. Wardwell                                Karl Farrar, Esq.
Brian Newell, Paralegal Administrative Judge Kaye D. Lathrop 190 Cedar Lane E.
Ridgway, CO 81432 Joshua A. Kirstein, Law Clerk


  [Original signed by Christine M. Pierpoint]
Docket Nos. 50-247-LR and 50-286-LR LB MEMORANDUM AND ORDER (RULING ON PENDING MOTIONS FOR LEAVE TO FILE NEW AND AMENDED CONTENTIONS)
Office of the Secretary of the Commission
William C. Dennis, Esq.                    Andrew M. Cuomo, Attorney General Assistant General Counsel                  John J. Sipos, Assistant Attorney General Entergy Nuclear Operations, Inc.            Janice A. Dean 440 Hamilton Avenue                        Assistant Attorney General White Plains, NY 10601                      Office of the Attorney General of the State of New York The Capitol State Street Albany, New York 12224 Kathryn M. Sutton, Esq.                    Joan Leary Matthews, Esq.
Paul M. Bessette, Esq.                      Senior Attorney for Special Projects Martin J. ONeill, Esq.                    New York State Department Counsel for Entergy Nuclear Operation, Inc. of Environmental Conservation Morgan, Lewis & Bockius, LLP                625 Broadway, 14th Floor 1111 Pennsylvania Avenue, NW                Albany, New York 12233-5500 Washington, DC 20004 Michael J. Delaney, Esq.                    Robert D. Snook, Esq.
Director, Energy Regulatory Affairs        Office of The Attorney General NYC Department of Environmental Protection  State of Connecticut 59-17 Junction Boulevard                    55 Elm Street Flushing, NY 11373                          P.O. Box 120 Hartford, CT 06141-0120 Arthur J. Kremer, Chairman                  Stephen C. Filler, Board Member New York Affordable Reliable Electricity    Hudson River Sloop Clearwater, Inc.
Alliance (AREA)                          724 Wolcott Ave.
347 Fifth Avenue, Suite 508                Beacon, NY 12508 New York, NY 10016 2


Dated at Rockville, Maryland
Docket Nos. 50-247-LR and 50-286-LR LB MEMORANDUM AND ORDER (RULING ON PENDING MOTIONS FOR LEAVE TO FILE NEW AND AMENDED CONTENTIONS)
Sean Murray, Mayor                  Manna Jo Greene, Environmental Director Kevin Hay, Village Administrator    Hudson River Sloop Clearwater, Inc.
Village of Buchanan                  724 Wolcott Ave.
Municipal Building                  Beacon, New York 12508 236 Tate Avenue Buchanan, NY 10511-1298              Ross Gould, Board Member Hudson River Sloop Clearwater, Inc.
270 Route 308 Rhinebeck, NY 12572 Counsel for the Town of Cortlandt    Nancy Burton, Esq.
Thomas F. Wood, Esq.                Connecticut Residents Opposed Daniel Riesel, Esq.                  to Relicensing of Indian Point (CRORIP)
Jessica Steinberg, J.D.              147 Cross Highway Sive, Paget & Riesel, P.C.          Redding Ridge, CT 06876 460 Park Avenue New York, NY 10022 Elise N. Zoli, Esq.                  Melissa-Jean Rotini, of counsel Goodwin Proctor, LLP                Assistant County Attorney Exchange Place                      Office of Robert F. Meehan, 53 State Street                      Westchester County Attorney Boston, MA 02109                    148 Martine Avenue, 6th Floor White Plains, NY 10601 FUSE USA                            Westchester Citizens Awareness Network John LeKay                          (WestCan), Citizens Awareness Network, Heather Ellsworth Burns-DeMelo      (CAN), et al Remy Chevalier                      Susan H. Shapiro, Esq.
Bill Thomas                          21 Pearlman Drive Belinda J. Jaques                    Spring Valley, NY 10977 351 Dyckman Street Peekskill, New York 10566 3


this 6 th  day of July 2011}}
Docket Nos. 50-247-LR and 50-286-LR LB MEMORANDUM AND ORDER (RULING ON PENDING MOTIONS FOR LEAVE TO FILE NEW AND AMENDED CONTENTIONS)
Philip Musegaas, Esq.                Richard L. Brodsky, Esq.
Deborah Brancato, Esq.                Member of Assembly Riverkeeper, Inc.                    92nd Assembly District, 20 Secor Road                        State of New York Ossining, NY 10562                    5 West Main Street Suite 205 Elmsford, NY 10523 Sarah L. Wagner, Esq.
Legislative Office Building, Room 422 Albany, NY 12248
[Original signed by Christine M. Pierpoint]
Office of the Secretary of the Commission Dated at Rockville, Maryland this 6th day of July 2011 4}}

Latest revision as of 19:37, 10 March 2020

Memorandum and Order (Ruling on Pending Motions for Leave to File New and Amended Contentions)
ML111870344
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 07/06/2011
From: Lathrop H, Lawrence Mcdade, Richard Wardwell
Atomic Safety and Licensing Board Panel
To:
SECY RAS
References
50-0247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01, RAS E-551
Download: ML111870344 (79)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:

Lawrence G. McDade, Chairman Dr. Kaye D. Lathrop Dr. Richard E. Wardwell In the Matter of Docket Nos. 50-0247-LR and 50-286-LR ENTERGY NUCLEAR OPERATIONS, INC. ASLBP No. 07-858-03-LR-BD01 (Indian Point Nuclear Generating Units 2 and 3) July 6, 2011 MEMORANDUM AND ORDER (Ruling on Pending Motions for Leave to File New and Amended Contentions)

TABLE OF CONTENTS INTRODUCTION ...................................................................................................................... I. LEGAL STANDARDS GOVERNING NEW/AMENDED CONTENTION ADMISSIBILITY II. NYS-12C .......................................................................................................................... A. Background ............................................................................................................... B. New York Motion ....................................................................................................... C. Entergy Answer ......................................................................................................... D. NRC Staff Answer ..................................................................................................... E. New York Reply......................................................................................................... F. Board Decision .......................................................................................................... III. NYS-17B .......................................................................................................................... A. Background ............................................................................................................... B. New York Motion and Requests Related to Proposed NYS-17B ............................ C. Entergy Answer ....................................................................................................... D. NRC Staff Answer ................................................................................................... E. New York Reply....................................................................................................... F. Board Decision ........................................................................................................ IV. AMENDED NYS-25........................................................................................................ A. Background ............................................................................................................. B. New York New Bases for NYS-25 ...........................................................................

ii C. Entergy Answer ....................................................................................................... D. NRC Staff Answer ................................................................................................... E. New York Reply....................................................................................................... F. Board Decision ........................................................................................................ V. NYS-37 .......................................................................................................................... A. Background and New York Motion .......................................................................... B. Entergy Answer ....................................................................................................... C. NRC Staff Answer ................................................................................................... D. New York Reply....................................................................................................... B. Board Decision ........................................................................................................ VI. RK-EC-3/CW-EC-1 ........................................................................................................ VII. CW-RK WASTE CONFIDENCE RULE CONTENTIONS ............................................... A. Background ............................................................................................................. B. Clearwater and Riverkeeper Joint Motion ............................................................... 1. Timeliness ...................................................................................................... 2. Entergy Motion to Strike Portions of Clearwaters and /Riverkeepers Reply . C. CW-EC-8/RK-EC-6 and CW-SC-2/RK TC-3 Admissibility and Exemption/Waiver Request Denial ........................................................................................................ D. CW-EC-9/RK-EC-7 and CW-SC-3/RK-TC-4 Admissibility ...................................... 1. Alleged Gap in the Waste Confidence Decision Update .............................. 2. Specific NEPA-Related Issues of CW-EC-9/RK-EC-7 ................................... E. Specific Safety-Related Issues of CW-SC-3/RK-TC-4 ............................................ F. Board Decision ........................................................................................................ VIII. AMENDED CW-EC-3 (CW-EC-3A)................................................................................ A. Procedural Background ........................................................................................... B. Board Decision ........................................................................................................ IX. RK-EC-8 ......................................................................................................................... A. Parties Positions ..................................................................................................... B. Legal Standards Governing the NRC Staff under the ESA and NEPA ................... C. Chronological Background of the NRC Staffs ESA Review in this Proceeding ...... D. Board Decision ........................................................................................................ X. CONCLUSION ...............................................................................................................

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:

Lawrence G. McDade, Chairman Dr. Kaye D. Lathrop Dr. Richard E. Wardwell In the Matter of Docket Nos. 50-0247-LR and 50-286-LR ENTERGY NUCLEAR OPERATIONS, INC. ASLBP No. 07-858-03-LR-BD01 (Indian Point Nuclear Generating Units 2 and 3) July 6, 2011 MEMORANDUM AND ORDER (Ruling on Pending Motions for Leave to File New and Amended Contentions)

INTRODUCTION Before the Board are several motions for leave to file new or amended contentions in response to Amendment 9 to Applicant, Entergy Nuclear Operations, Inc.s (Entergy) License Renewal Application (LRA)1 and the NRC Staffs Final Supplemental Environmental Impact Statement (FSEIS).2 Some of these motions entail waiver petitions, exemption requests, and/or motions to strike. We first address the standards for contention admissibility and then separately discuss each proposed contention and its associated motions.

1 See Letter from Fred Dacimo, Vice President, License Renewal, Entergy Nuclear Northeast, to U.S. Nuclear Regulatory Commission, NL-10-063, Attach. 1, Amendment 9 to License Renewal Application - Reactor Vessel Internals Program (July 14, 2010) (ADAMS Accession No. ML102010102) [hereinafter LRA amend. 9]; see also Letter from Kathryn M. Sutton and Paul M. Bessette, Counsel for Entergy Nuclear Operations, Inc., to Atomic Safety and Licensing Board (July 15, 2010).

2 The NRC Staff issued the FSEIS on December 3, 2010. See Letter from Sherwin E. Turk, Counsel for NRC Staff, to Atomic Safety and Licensing Board (Dec. 3, 2010); Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437, Supplement 38, Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Final Report, NUREG-1437 (Dec. 2010)

[hereinafter FSEIS].

I. LEGAL STANDARDS GOVERNING NEW/AMENDED CONTENTION ADMISSIBILITY Consistent with the provisions in 10 C.F.R. § 2.309(f)(2), a timely new or amended contention must be based on information that previously was unavailable, arise from information that is materially different from previous information, and be filed in a timely fashion.3 Our July 1, 2010 Scheduling Order generally provided for a thirty-day window within which to file new or amended contentions based on new information.4 The opening of this window is the date that the materially different new information becomes reasonably available to the participants in this proceeding.5 If a new or amended contention is not timely filed, its proponent must meet the eight-factor balancing test of 10 C.F.R. § 2.309(c)(1). Of the eight factors identified in Section 2.309(c)(1), the Commission has deemed the good cause factor the most important.6 In addition to Section 2.309(f)(2) or (c)(1)s standards, a new or amended contention must also satisfy the general contention admissibility requirements of 10 C.F.R. § 2.309(f)(1).7 In our July 1, 2010 Scheduling Order, we stated that if a party moving for admission of a new or amended contention is uncertain whether Section 2.309(c)(1) (for nontimely filed contentions) or Section 2.309(f)(2) (for timely filed contentions) applies, it may file pursuant to both sections.8 3

Id. § 2.309(f)(2)(i)-(iii).

4 Licensing Board Scheduling Order (July 1, 2010) at para. F.2 (unpublished) [hereinafter July 1, 2010 Scheduling Order].

5 Cf. Northern States Power Co. (Prairie Island Nuclear Generating Plant, Units 1 and 2), CLI-10-27, 72 NRC __, __-__ (slip op. at 17-18) (Sept. 30, 2010).

6 AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-09-07, 69 NRC 235, 261 (2009).

7 See id.; Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station, Unit 3), CLI 05, 69 NRC 115, 120 n.21 (2009).

8 See July 1, 2010 Scheduling Order at para. F.2.

NRC regulations dictate that contentions arising pursuant to the National Environmental Policy Act (NEPA) must initially be based on the applicants environmental report [ER].9 If admitted, those contentions may be amended, or new contentions proffered, as long as there are data or conclusions in the NRC draft or final environmental impact statement . . . or any supplements relating thereto, that differ significantly from the data or conclusions in the applicants documents.10 In our December 27, 2010 Order, we stated that new or amended contentions that are properly based on significantly new data or conclusions in the FSEIS will be considered timely if filed on or before February 3, 2011.11 II. NYS-12C A. Background Before addressing the admissibility of the State of New Yorks (New Yorks) Contention 12-C (NYS-12C), the history of earlier iterations of this contention is summarized as follows.

We first admitted NYS-12, which contested the accuracy of Entergys severe accident mitigation alternatives (SAMA) analysiss estimation of decontamination and clean up costs in the New York City metropolitan area from a severe nuclear accident at the Indian Point Energy Center (IPEC). More specifically, NYS-12 alleged that the ERs use of the MACCS2 computer code effectively underestimated the cost of a severe accident.12 We then admitted NYS-12A, which raised a comparable dispute with the adequacy of the NRC Staffs Draft Supplemental 9

10 C.F.R. § 2.309(f)(2).

10 Id. (emphasis added).

11 Licensing Board Order (Granting Intervenors Unopposed Joint Motion for an Extension of Time) (Dec. 27, 2010) at 2 (unpublished). Because the FSEIS was issued on December 3, 2010, new or amended contentions would have been due by January 3, 2011 without the extension we granted. See id. at 1.

12 LBP-08-13, 68 NRC 43, 100-02 (2008).

Environmental Impact Statement (DSEIS) on this topic.13 Subsequently, we admitted NYS-12B, which raised a similar challenge to Entergys December 2009 SAMA Reanalysis.14 B. New York Motion NYS-12C, filed on February 3, 2011,15 purports to update New Yorks earlier claims against Entergys ER and the NRC Staffs DSEIS by applying them to the FSEIS.16 Specifically, New York faults the FSEISs reliance on the MACCS2 code because of that models assumption that a severe accident would entail the release of large-sized (rather than small-sized) radionuclide particles, which results in an underestimation of the cleanup costs of a severe nuclear accident in the region around Indian Point.17 New York states that the FSEIS incorrectly fails to scale up the [1996 Sandia Study] decontamination cost data for a high density urban 13 Licensing Board Order (Ruling on New York States New and Amended Contentions) (June 16, 2009) at 3-4 (unpublished) [hereinafter June 16, 2009 Licensing Board Order].

14 LBP-10-13, 71 NRC __, __ (slip op. at 9-10) (June 30, 2010).

15 State of New Yorks Motion for Leave to File New and Amended Contention-12C Concerning NRC Staffs December 2010 Final Supplemental Environmental Impact Statement and the Underestimation of Decontamination and Clean Up Costs Associated with a Severe Accident in the New York Metropolitan Area (Feb. 3, 2011) [hereinafter New York Motion for Leave to File NYS-12C]; State of New York New Contention-12C Concerning NRC Staffs December 2010 Final Environmental Impact Statement and the Underestimation of Decontamination and Clean Up Costs Associated with a Severe Accident in the New York Metropolitan Area (Feb. 3, 2011)

[hereinafter NYS-12C]. On March 7, 2011, Entergy and the NRC Staff each filed Answers opposing in part admission of NYS-12C. Applicants Answer to New York States Amended Contention 12C Concerning Severe Accident Mitigation Alternatives Analysis (Mar. 7, 2011)

[hereinafter Entergy Answer to NYS-12C]; NRC Staffs Answer to State of New York Contention 12-C Concerning the Final SEIS Evaluation of Decontamination and Clean Up Costs in a Severe Accident (Mar. 7, 2011) [hereinafter NRC Staff Answer to NYS-12C]. On March 18, 2011, New York filed its Combined Reply to Entergys and the NRC Staffs Answers. State of New Yorks Combined Reply to NRC Staff and Entergys Answers to Contention 12-C Concerning NRC Staffs December 2010 Final Environmental Impact Statement and the Underestimation of Decontamination and Clean Up Costs Associated with a Severe Reactor Accident in the New York Metropolitan Area (Mar. 18, 2011) [hereinafter New York NYS-12C Reply].

16 NYS-12C at 2-3.

17 Id. at 4-7.

area such as New York City and its metropolitan area.18 In support of this claim, New York relies on information supplied in NYS-12/12A/12B as well as a report dated February 2011 and signed by its proffered expert, David Chanin, who incorporates other reports into his position regarding the FSEIS that the NRC Staff needs to take account property values around Indian Point and to express those values in present and future values.19 New York adds challenges to the FSEISs discussions of severe accidents to its claims against Entergys ER and the NRC Staffs DSEIS, concluding that the FSEISs underestimation of cleanup costs violates the NRC Staffs duties under NEPA, the Administrative Procedure Act (APA), and NRC and Council on Environmental Quality (CEQ) regulations.20 Entergy and the NRC Staff do not oppose the admission of NYS-12C insofar as it seeks to apply NYS-12/12A/12C to the FSEIS; Entergy limits its tolerance of the contention to its reliance on supporting evidence identified by New York in earlier versions of the contention.21 Other than that, both parties oppose admission of the contention.

C. Entergy Answer Entergy portrays Mr. Chanins report (and the reports it relies on) as too attenuated to the SAMA analysis conducted for Indian Point and thus insufficient to support New Yorks arguments in NYS-12C.22 Moreover, Entergy maintains that New York has not raised a genuine dispute of material fact with the FSEIS because (1) the radionuclides postulated in the FSEIS are indeed small, and radionuclides similar to those used in the Indian Point SAMA analysis in the FSEIS have been found acceptable for SAMA analyses at other facilities in the past, (2) Mr.

Chanins position does not materially contradict conclusions made in the FSEIS regarding 18 Id. at 7.

19 Id. at 7-15.

20 Id. at 1.

21 Entergy Answer to NYS-12C at 16-17; NRC Staff Answer to NYS-12C at 8.

22 Entergy Answer to NYS-12C at 17-22.

clean-up costs from plutonium and cesium dispersal, (3) there is no technical reason to require a higher population density multiplier per-square-kilometer than that used in the FSEIS, (4) the FSEIS did include an analysis of severe accidents impacts on local property values using site-specific data, and (5) New Yorks demands would transform the SAMA analysis into a worst-case analysis, something that Entergy argues is beyond the requirements for license renewal in NRC regulations.23 D. NRC Staff Answer The NRC Staff attacks the timeliness of elements of NYS-12C, positing that New York could have raised challenges to compliance with the APA and NRC and CEQ regulations earlier and that positions found in Mr. Chanins report citing other documents could have been raised earlier.24 Moreover, the NRC Staff describes the agencys compliance with CEQ regulations as immaterial to its licensing decision in this proceeding.25 On a larger scale, the NRC Staff describes much of New Yorks claims as vague and represents that the sufficiency of its review of Entergys SAMA Analysis is subject to challenge in this proceeding, rather than the adequacy of its review contained in the FSEIS.26 E. New York Reply New York replies that NYS-12C was timely filed because its references to CEQ regulations and the APA are not new, given that it has previously raised objections citing such authority regarding similar issues.27 Similarly, New York responds that Mr. Chanins report and 23 Id. at 22-25.

24 NRC Staff Answer to NYS-12C at 10-25. Entergy also states that positions in Mr. Chanins report could have been filed earlier and are thus impermissible support for New York, but does not object to the timeliness of NYS-12Cs challenge to Section G of the FSEIS. See Entergy Answer to NYS-12C at 17 n.90.

25 NRC Staff Answer to NYS-12C at 10, 12 & n.25, 19-20, 23-24.

26 See id. at 14, 17-20, 22.

27 New York NYS-12C Reply at 5-6.

the documents cited therein were timely filed because NYS-12C was triggered by the FSEISs response to NYS-12/12A/12B rather than these documents that support the proposed amended contention.28 New York also objects to the NRC Staffs supposition that contentions may not be filed against licensing documents issued by the NRC Staff.29 Further, New York represents that it has provided enough information to support its claims and has not sought to impose a more restrictive worst-case SAMA analysis on the review of Entergys LRA for Indian Point Units 2 and 3 (IP2 and IP3) than NRC regulations require.30 F. Board Decision The NRC Staff is mistaken that its environmental review is immune from challenge in adjudicatory proceedings. It is true that the NRC Staffs safety review is not directly subject to challenge, because it is the sufficiency of the license application that is subject to litigation, not the sufficiency of the NRC Staffs review of that application.31 Nevertheless, the structure of 10 C.F.R. § 2.309(f)(2) permits new or amended contentions to be filed against multiple forms and stages of the NRC Staffs environmental review and, accordingly, such claims are within the scope of this proceeding pursuant to Section 2.309(f)(1)(iii). Moreover, as we have stated above, Section 2.309(f)(2) allows contentions originally filed against an applicants ER to be amended if there are data and conclusions in NRC Staff environmental documents that differ significantly from the data or conclusions in the applicants documents.32 NYS-12Cs claims regarding the sufficiency of Entergys and the NRC Staffs SAMA reviews mirror the basic allegation found in the consolidated contention that NYS-12C seeks to amend - namely, that 28 Id. at 8.

29 Id. at 7-11.

30 Id. 13-17.

31 See AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-08-23, 68 NRC 461, 482 (2008).

32 10 C.F.R. § 2.309(f)(2).

Entergys and the NRC Staffs use of the MACCS2 code leads to an underestimation of the cleanup costs from a severe accident.33 That overarching aspect of this contention, including its citation to the 1996 Sandia National Laboratories Report, has not differed significantly in NYS-12C and is within the scope of the already consolidated NYS-12/12A/12B.

New Yorks citations to the APA, NRC regulations, and CEQ regulations are neither untimely nor improper at this juncture. As we have previously noted, the NRC Staff is bound to follow the APA and NRC regulations in carrying out its duties under NEPA.34 Moreover, the NRC gives deference to CEQ regulations to the extent that they do not have a substantive impact on the way in which the Commission performs its regulatory functions.35 Similarly, the fact that New York brings factual and expert support that might be years old to support its claims does not render the contention buttressed by that support either untimely or inadmissible. As we read it, NYS-12C arises from the NRC Staffs FSEIS, which explicitly attempts to resolve concerns raised in NYS-12/12A/12B.36 The expert analyses brought in NYS-12C are not the underlying basis giving rise to the contention but are tools used by New York to attempt to refute the validity of the NRC Staffs analysis. The basis of the contention pursuant to Section 2.309(f)(1)(ii) is that the NRC Staffs analysis in the FSEIS underestimates severe accident cleanup costs due to use of the MACCS2 code. Therefore, the contention is based on new information, the FSEIS, and is not late filed.

Also, the fact that Mr. Chanin has asserted a plausible link between the documents he cites and the NRC Staffs SAMA analysis that uses the MACCS2 code constitutes adequate expression of an expert opinion pursuant to Section 2.309(f)(1)(v) and raises a genuine dispute 33 See LBP-08-13, 68 NRC at 100-02.

34 See LBP-10-13, 71 NRC at __ (slip op. at 28).

35 Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), CLI-91-02, 33 NRC 61, 72 n.3 (1991) (citations omitted).

36 See FSEIS at G-22 to G-24.

pursuant to Section 2.309(f)(1)(vi) as to the sufficiency of the NRC Staffs SAMA analysis as articulated in the FSEIS. The extent to which Mr. Chanins opinion is correct is a merits question that we leave for the evidentiary hearing in this proceeding. Accordingly, we find that NYS-12C is admissible and consolidate it with NYS-12/12A/12B as Consolidated NYS-12C.

III. NYS-17B A. Background In granting New Yorks hearing request in this proceeding, we admitted NYS-17, which alleged that Entergys ER fails to include an analysis of adverse impacts on off-site land use of license renewal and thus erroneously concludes that relicensing of IP2 and IP3 will have a significant positive impact on the communities surrounding the station (ER Section 8.5) and understates the adverse impact on off-site land use (ER Sections 4.18.4 and 4.18.5) in violation of 10 C.F.R. Part 51, Subpart A, Appendix B.37 Our ruling stated in pertinent part:

In conducting its analysis of the impact of the license renewal on land use, Entergy should have considered the impact on real estate values that would be caused by license renewal or nonrenewal. NRC Regulations do not limit consideration to tax-driven land-use changes. Table B-1 merely notes that significant changes in land use may be associated with population and tax-revenue changes resulting from license renewal. It does not limit consideration to tax-driven land-use changes. Accordingly, we admit NYS-17 as a contention of omission.38 On February 27, 2009, New York submitted amended contention NYS-17A, which was based on the NRC Staffs DSEIS, alleging that:

The [DSEIS] fails to address the impact of the continued operation of IP2 and IP3 for another 20 years on off-site land use, including real estate values in the surrounding area in violation of 10 C.F.R. §§ 51.71(a), 51.71(d), 51.95(c)(1), and 51.95(c)(4).39 37 LBP-08-13, 68 NRC at 113.

38 Id. at 116.

39 June 16, 2009 Licensing Board Order at 7.

We admitted NYS-17A and consolidated it with NYS-17, ruling that this amended contention update[d] the original to reflect that New York contends that the NRC Staff erred in a similar manner to Entergy and that the original contention was now relevant to the Draft SEIS, as well as to the ER.40 On April 22, 2010, we denied a Motion for Summary Disposition of NYS-17/17A filed by Entergy, ruling that NYS-17/17A was within the scope of this proceeding and that there remain[ed] a genuine dispute over a material fact regarding the socioeconomic environmental impacts of license renewal on property values adjacent to [Indian Point].41 However, in so ruling, the Board included the following caveat:

We agree with Entergy that proffered NEPA contentions relating to on-site spent fuel storage are outside the scope of this proceeding due to the Waste Confidence Rule (codified as 10 C.F.R. § 51.23), whose continuing viability we recently certified to the Commission.42 B. New York Motion and Requests Related to Proposed NYS-17B On January 24, 2011, New York filed (1) a Motion for Leave to File Timely Amended Bases to Contention 17A (Now to be Designated Contention 17B)43; (2) a Request that the proposed amended bases for NYS-17A be deemed not barred by 10 C.F.R. § 51.23(b), that we exempt New York from the requirements of Section 51.23(b), or that we certify the waiver of 10 40 Id. at 8.

41 Licensing Board Memorandum and Order (Denying Entergys Motion for the Summary Disposition of NYS Contention 17/17A) (Apr. 22, 2010) at 11-17 (unpublished) [hereinafter Apr.

22, 2010 Licensing Board Memorandum and Order].

42 Id. at 13-14.

43 State of New York Motion for Leave to File Timely Amended Bases to Contention 17A (Now to be Designated Contention 17B) (Jan. 24, 2011) [hereinafter New York Motion for Leave to File NYS-17B].

C.F.R. § 51.23(b);44 and (3) a proposed Contention 17B (NYS-17B) containing the amended bases.45 Proposed NYS-17B reads:

The FSEIS fails to address the impact of the continued operation of IP2 and IP3 for another 20 years on offsite land use, including real estate values in the surrounding area in violation of 10 C.F.R. §§ 51.71(a), 51.71(d), 51.95(c)(1), and 51.95(c)(4).46 Using the update to the Waste Confidence Rule promulgated by the NRC on December 23, 2010, as its starting point, New York asserts that there is no longer a date certain by which spent fuel will be removed from the Indian Point site, and that there is every reason to believe that spent fuel will remain at the Indian Point site for an indefinite period following plant shutdown after license renewal.47 Accordingly, New York argues that granting Entergys LRA for IP2 and IP3 will perpetuate depressed land values and reduced tax revenues.48 Moreover, because in its view the FSEIS did not cure the alleged omissions in Entergys ER and the DSEIS by analyzing the impacts to off-site property values and tax revenues from long-term storage of spent fuel, New York argues that the FSEIS does not sufficiently address this issue.49 44 State of New Yorks Request for a Determination that the Proposed Amended Bases for Contention 17A are not Barred by 10 C.F.R. § 51.23(b), or that Exemption from the Requirements of 10 C.F.R. § 51.23(b) Should be Granted, or that the State has Made a Prima Facie Case that § 51.23(b) Should be Waived as Applied to Contention 17B (Jan. 24, 2011)

[hereinafter New York Alternative Requests Re: NYS-17B].

45 State of New York Contention 17B (Jan. 24, 2011) [hereinafter NYS-17B].

46 Id. at 2. Entergy and the NRC Staff filed Answers to New Yorks filings associated with NYS-17B on February 18, 2011. Applicants Answer to Proposed Amended Contention New York State 17B and the Associated Request for Exemption and/or Waiver of 10 C.F.R. § 51.23(b)

(Feb. 18, 2011) [hereinafter Entergy Answer to NYS-17B]; NRC Staffs Answer to the State of New Yorks Motion for Leave to File Amended Bases to Contention 17A (To be Designated 17B) and Request for an Exemption or Waiver (Feb. 18, 2011) [hereinafter NRC Staff Answer to NYS-17B]. New York filed its Reply on March 4, 2011. State of New Yorks Combined Reply to the Answers of Entergy and NRC Staff to the States Proposed Amended Contention NYS-17B (Mar. 4, 2011) [hereinafter New York NYS-17B Reply].

47 New York Motion for Leave to File NYS-17B at 1-2.

48 Id. at 6.

New York maintains that this contention is based on new and materially different information because of the new Waste Confidence Rules shift from a date certain that spent fuel would be removed from the site to an open-ended timeline.50 Further, New York represents that this amended contention is timely because it was filed within thirty days of the new Waste Confidence Rules promulgation.51 Together with its Motion to add the new bases of NYS-17B to NYS-17/17A, New York provides an alternative pleading that argues claims arising from the long-term on-site storage of spent fuel are not barred by the updated Waste Confidence Rule but, if we were to rule contrary to that position, New York asks the Board to either exempt New York from that Rule or to certify a request for waiver of that Rule to the Commission.52 C. Entergy Answer Entergy opposes admission of NYS-17B and New Yorks proposed alternative remedies of exemption or waiver. Entergy maintains that NYS-17B and its associated waiver petition are untimely because the possibility of long-term storage of spent fuel at the Indian Point site was publicly known and acknowledged by New York for at least one year before New York submitted its pleadings related to NYS-17B.53 Regardless of timeliness, Entergy asserts that this contention is not admissible because the Waste Confidence Rule has generically resolved the challenges that are at the heart of NYS-17B, which relate to the long-term on-site storage of spent fuel at Indian Point for up to sixty years after cessation of operations, and is also inadmissible because the Commission is 49 Id. at 4-5.

50 Id. at 1-4.

51 Id. at 3.

52 New York Alternative Requests Re: NYS-17B at 2--11, 13-20.

53 Entergy Answer to NYS-17B at 15-19.

considering the environmental impacts of long-term on-site storage beyond this period in an ongoing rulemaking.54 Likewise, Entergy contends that any disputes concerning decommissioning of IP2 and IP3, increases in spent fuel generation, and the environmental impacts of independent spent fuel storage installations are not subject to the NRCs license renewal review.55 Entergy depicts these claims by New York as outside the scope of this proceeding, immaterial to the NRCs licensing decision in this proceeding, and failing to raise a genuine dispute of law or fact.56 Entergy also claims that NYS-17B is inadmissible pursuant to 10 C.F.R. § 2.309(f)(1)(v) because the declaration submitted by New Yorks expert, Dr. Stephen C. Sheppard, does not support New Yorks arguments and lacks a reasoned basis or explanation.57 Entergy also resists New Yorks requests for an exemption or waiver from the Waste Confidence Rule. Entergy portrays exemption requests as beyond the powers of a licensing board to grant and represents that the provisions of 10 C.F.R. § 2.335 are the exclusive method by which an intervenor may secure the waiver of the application of NRC regulations.58 Finally, according to Entergy, New York has not successfully met the four-factor test for granting waiver petitions that was articulated by the Commission in Millstone.59 D. NRC Staff Answer The NRC Staff does not oppose admission of those aspects of NYS-17B that amend NYS-17A to refer to the FSEIS, but objects to admission of those aspects of NYS-17B 54 Id. at 19-24.

55 Id. at 25-30.

56 See id. at 19-30, 32.

57 Id. at 30-32.

58 Id. at 33-38.

59 Id. at 38-46.

concerning the environmental impacts or alternatives associated with the generation and storage of spent fuel and opposes New Yorks exemption request and waiver petition.60 The NRC Staff characterizes NYS-17B as an inadmissible challenge to the Waste Confidence Rule and therefore as outside the scope of this proceeding because the contention attempts to litigate an environmental issue specifically barred by NRC regulations.61 Further, the NRC Staff represents that New Yorks assumptions regarding the timeline for removal of nuclear waste are incorrect, and thus the contention lacks the requisite factual basis.62 In addition, NYS-17B is unjustifiably late-filed, says the NRC Staff, because the new Waste Confidence Rule and Entergys 2009 Decommissioning Plan have not produced any new expectation for or information regarding the removal of spent fuel from Indian Point. In addition, the Staff notes that New York has for the first time styled this contention a contention of inadequacy despite its prior designation as a contention of omission.63 Similarly, the NRC Staff urges that New Yorks waiver petition is unwarranted, given that New York has not shown that site-specific environmental impacts at Indian Point associated with the Waste Confidence Rule are significantly different from those in other license renewal proceedings subject to the Rule and given that the Commissions promulgation of the new Waste Confidence Rule specifically considered (and dismissed consideration of) the concerns raised in NYS-17B.64 Finally, the NRC Staff argues that the Board is not empowered to grant exemptions from NRC regulations, New York would not qualify as the type of party entitled to an exemption, and the Commission specifically suggested New York could pursue a waiver petition 60 NRC Staff Answer to NYS-17B at 2.

61 Id. at 21-26.

62 Id. at 26-27.

63 Id. at 27-30.

64 Id. at 34-37.

to lift the restrictions of the Waste Confidence Rule when that Rule was updated.65 E. New York Reply New York replies that NYS-17B was timely filed because it was submitted consistent with prior Board Orders that deemed analogous challenges as timely during earlier Waste Confidence Rule rulemaking announcements and that NYS-17B was filed within thirty days of the new Rules promulgation.66 Similarly, New York asks the Board to regard the predicted dates for spent fuel removal in the new Waste Confidence Rule as previously unavailable new information to permit admission of NYS-17Bs new bases pursuant to 10 C.F.R. § 2.309(f)(2).67 New York also resists labeling NYS-17B as a challenge to the Waste Confidence Rule and reaffirms its position that the environmental impacts of long-term spent fuel storage are within the scope of this license renewal proceeding due to the increased waste generation resulting from license renewal, the updated Waste Confidence Rules extension of the date for on-site storage of that increased waste, the FSEISs discussion of the environmental impacts of the uranium fuel cycle, and off-site land uses classification as a Category 2 issue.68 According to New York, its expert, Dr. Sheppard, has outlined a genuine dispute over these site-specific (rather than generic) impacts to off-site property values that is material to the NRCs licensing decision in this proceeding, given the significant adverse impact that license renewal could inflict on property values surrounding Indian Point.69 Finally, New York insists that the Board does have the authority to grant an exemption from the Waste Confidence Rule and that no Commission precedent dictates otherwise.70 65 Id. at 38-40.

66 New York NYS-17B Reply at 3-5.

67 Id.

68 Id. at 5-8, 11-17.

69 Id. at 9-11, 19-20.

F. Board Decision The Board finds that NYS-17B is within the scope of this proceeding and that there exists a genuine dispute of material fact regarding the socioeconomic environmental impacts of license renewal on property values adjacent to the IPEC. NYS-17B differs from previously admitted NYS-17/17A primarily in the substitution of the FSEIS for the DSEIS and, in accord with the Boards previous rulings,71 we admit NYS-17B insofar as it applies the bases of NYS-17/17A to the FSEIS instead of the DSEIS.

New York attempts to justify its addition of new bases to NYS-17/17A with the Commissions issuance of a revised Waste Confidence Rule and Decision, arguing that there is no longer a date certain of 2025 for the removal of spent fuel from IPEC, specifically stating that [i]f the licenses for IP2 and IP3 are not extended, owners and potential purchasers of land adjacent to Indian Point can contemplate that the site will be cleared of an operating nuclear plant and the structures associated with operation of the plant by 2025.72 This point is irrelevant because the Waste Confidence Rule has never specified a timetable for the removal of spent fuel and NRC regulations have long envisioned the possibility of spent fuel remaining on reactor sites until the end of site decommissioning a general period of thirty to sixty years beyond the facilitys licensed life.73 New York also argues that the no-action alternative would 70 Id. at 17-19.

71 See June 16, 2009 Licensing Board Order at 8; LBP-08-13, 68 NRC at 116.

72 NYS-17B at para. 11.

73 See 10 C.F.R. §§ 50.82(a)(3) (Decommissioning will be completed within 60 years of permanent cessation of operations.), 51.23(a) (generically determining that, if necessary, spent fuel generated in any reactor can be stored safely and without significant environmental impacts for at least 60 years beyond the licensed life for operation (which may include the term of a revised or renewed license) of that reactor in a combination of storage in its spent fuel storage basin and at either onsite or offsite independent spent fuel storage installations.

Further, the Commission believes there is reasonable assurance that sufficient mined geologic repository capacity will be available to dispose of the commercial high-level radioactive waste and spent fuel generated in any reactor when necessary.); Consideration of Environmental Impacts of Temporary Storage of Spent Fuel After Cessation of Reactor Operation, 55 Fed.

substantially increase the beneficial uses for land adjacent (within 2 miles) to the IPEC site and increase the value of that land, whereas extended operation of IP2 and IP3, and the presence of the additional waste they generate, will deprive adjacent lands of the economic recovery that they would otherwise enjoy.74 Further, New York argues that its new bases should be allowed because the impacts on property values of spent fuel are site-specific and are exempt from the provisions of 10 C.F.R. § 51.23(b).75 We disagree. The presence of spent fuel is generic to all reactor sites under both the Generic Environmental Impact Statement (GEIS) for License Renewals and the Waste Confidence Rule.76 To argue that the presence of spent fuel itself on the site affects property values is to assert that there is an environmental impact from the presence of spent fuel that must be assessed on a site-specific basis, contradicting the language of the Waste Confidence Rule, 10 C.F.R. § 51.23(b), which states that there is no such requirement.77 In promulgating its Reg. 38,472, 38,474 (Sept. 18, 1990) (generically determining that, if necessary, spent fuel generated in any reactor can be stored safely and without significant environmental impacts for at least 30 years beyond the licensed life for operation (which may include the term of a revised or renewed license) of that reactor at its spent fuel storage basin or at either onsite or offsite independent spent fuel storage installations.); Requirements for Licensee Actions Regarding the Disposition of Spent Fuel Upon Expiration of Reactor Operating Licenses, 49 Fed. Reg.

34,688, 34,694 (Aug. 31, 1984) (generically determining that for at least 30 years beyond the expiration of reactor operating licenses no significant environmental impacts will result from the storage of spent fuel in reactor facility storage pools or independent spent fuel storage installations located at reactor or away-from-reactor sites.).

74 NYS-17B at paras. 5-7.

75 Id. at para. 19.

76 10 C.F.R. Part 51, app. B, tbl. B-1 (labeling each aspect of the uranium fuel cycle and waste management a Category 1 issue exempt from site-specific environmental review); id. § 51.23(a)

(The Commission has made a generic determination that, if necessary, spent fuel generated in any reactor can be stored safely and without significant environmental impacts for at least 60 years beyond the licensed life for operation (which may include the term of a revised or renewed license) of that reactor in a combination of storage in its spent fuel storage basin and at either onsite or offsite independent spent fuel storage installations.).

77 Id. § 51.23(b) (. . . no discussion of any environmental impact of spent fuel storage in reactor facility storage pools or independent spent fuel storage installations (ISFSI) for the period following the term of the reactor operating license or amendment, reactor combined license or

update to the Waste Confidence Rule, the Commission stated that:

What is not considered in [reactor licensing and rector license renewal]

proceedingsdue to the generic determination in 10 CFR 51.23(a)is the potential environmental impact of storage of spent fuel for a 60-year period after the end of licensed operations or the potential environmental impacts of ultimate disposal. Environmental analysis for this period is covered by the environmental analysis the NRC has done in this update to the Waste Confidence Decision . . . .78 Because the Commission has specifically barred consideration of the environmental impacts of long-term storage of spent fuel in adjudicatory proceedings, this aspect of NYS-17B is inadmissible as beyond the scope of this proceeding pursuant to 10 C.F.R. § 2.309(f)(1)(iii).

Nevertheless, the negative effect on property values predicted by Dr. Sheppard that would result from the longer-term presence of spent fuel anticipated by the updated Waste Confidence Rule is not an environmental impact barred by the Waste Confidence Rule. The potential for spent fuel to indefinitely stay on-site is not an environmental impact associated with the spent fuel itself; rather, it is the occupation of the site by components of IPEC that has the potential to bring down property values if license renewal is granted. It is the value and uses of adjacent property that are site-specific environmental impacts.79 A challenge based on the impact of IPEC components long-term on-site existence upon surrounding property values is not barred by the Waste Confidence Rule.

Because the admission of NYS-17B as limited permits an analysis of the putative positive property value impact of the no-action alternative compared to the property value impact of the proposed action, we find it unnecessary to rule on New Yorks request for an amendment, or initial ISFSI license or amendment for which application is made, is required in any environmental report, environmental impact statement, environmental assessment, or other analysis prepared in connection with the issuance or amendment of an operating license for a nuclear power reactor under parts 50 and 54 of this chapter . . . .).

78 Waste Confidence Decision Update, 75 Fed. Reg. 81,037, 81,041 (Dec. 23, 2010).

79 10 C.F.R. Part 51, app. B, tbl. B-1 (Significant changes in land use may be associated with population and tax revenue changes resulting from license renewal.).

exemption to or a waiver from the provisions of Section 51.23(b). Accordingly, NYS-17B, as limited, flows from the publication of the FSEIS,80 is timely, and is admitted and consolidated with NYS-17/17A as Consolidated NYS-17B.81 IV. AMENDED NYS-25 A. Background In granting New Yorks hearing request in this proceeding, we admitted Contention NYS-25, which alleged that Entergys LRA lacked [a]n adequate plan to monitor and manage the effects of aging due to embrittlement of the reactor pressure vessels (RPVs) and the associated internals.82 NYS-25, as originally submitted, conceded that Entergys LRA alluded to the effects of thermal shock transients on the reactors at Indian Point, but New York, through its expert, argued that a degradation in ductility (embrittlement) will adversely affect the reactors ability to withstand pressurized thermal shock transients.83 Therefore, NYS-25 claimed that Entergys LRA was inadequate because it did not contain any evaluation of the consequences of embrittlement in its analysis of the effect of transient loads.84 NYS-25 characterized this as a fatal omission in Entergys LRA because, without such an evaluation, the LRA failed to show that the embrittled RPV internal structures will not fail [during the period of extended operations] and that a coolable core geometry will be maintain[ed] subsequent to a

[Design Basis Loss of Coolant Accident].85 We found that this contention raised a genuine 80 See NYS-17B at paras. 21-23.

81 While not necessary to our decision, we agree with Entergy and the NRC Staff that the Board does not have the authority to exempt a litigant from the import of the Waste Confidence Rule and that submission of a waiver request to the Commission would be inappropriate based on the facts presented here.

82 LBP-08-13, 68 NRC at 129.

83 Id. at 131.

84 Id.

85 Id.

dispute that was within the scope of this proceeding regarding [w]hether an AMP [Aging Management Program] is necessary to manage the cumulative effects of embrittlement of the RPVs and associated internals.86 On July 14, 2010, Entergy submitted its ninth LRA amendment, NL-10-063, which includes Entergys Reactor Vessel Internals Program.87 Based on LRA Amendment 9, New York filed a Motion on September 15, 2010, to add new bases to the already-admitted contention, NYS-25.88 B. New York New Bases for NYS-25 New York presents new bases for NYS-25 to alter the focus of its contention from one of omission to one of inadequacy, asserting that LRA Amendment 9 is inadequate under 10 C.F.R.

§ 54.51(c)(1)(iii).89 New York concedes that LRA Amendment 9 attempts to provide an AMP for Indian Points reactor pressure vessels and internal components, but claims that Entergys LRA remains inadequate for the following new reasons:

(1) failing to consider the synergistic effects of embrittlement and metal fatigue on RPV and internals; (2) failing to provide sufficient objective details about when it will conduct and complete baseline inspections and measurements; (3) failing to provide sufficient objective details about how and when it will implement corrective actions to address problems identified with embrittlement; (4) failing to include adequate inspection techniques to identify embrittlement issues for 86 Id.

87 LRA amend. 9.

88 State of New Yorks Motion for Leave to File Additional Bases for Previously-Admitted Contention NYS-25 in Response to Entergys July 14, 2010 Proposed Aging Management Program for Reactor Pressure Vessels and Internal Components (Sept. 15, 2010) [hereinafter NYS-25]. Entergy and the NRC Staff filed Answers opposing New Yorks Motion on October 12, 2010. Applicants Answer to Amended Contention New York State 25 Concerning Aging Management of Embrittlement of Reactor Vessel Internals (Oct. 12, 2010) [hereinafter Entergy Answer to NYS-25]; NRC Staffs Answer to State of New Yorks Motion for Leave to File Additional Bases for Previously-Admitted Contention NYS-25 (Oct. 12, 2010) [hereinafter NRC Staff Answer to NYS-25]. New York filed a Joint Reply to Entergys and the NRC Staffs Answers on October 22, 2010. State of New Yorks Joint Reply to Entergy and NRC Staffs Separate Answers to the States Additional Bases for Previously-Admitted Contention NYS-25 (Oct. 22, 2010) [hereinafter New York NYS-25 Reply].

89 NYS-25 at 5.

certain RPV internals, including bolts; and (5) relying on vague future commitments to undertake corrective action when Entergy has encountered difficulties in tracking and completing commitments and corrective actions in a timely manner.90 The specific components that New York claims should have been analyzed include:

the core baffle, intermediate shells, former plates and bolts (particularly the re-entrant corners), and including the baffle-to-baffle bolt locations, the core barrel-to-former bolt locations, and baffle-to-former bolt locations, core barrel (and its welds), lower core plate and support structures, clevis bolts, fuel alignment pins, thermal shield, the lower support column and mixer, and the control rods and their associated guide tubes, plates, and welds.91 Relying on the Declaration of Dr. Richard T. Lahey, Jr., New York claims that

[i]nadequate management of the effects of embrittlement on RPV and internals could result in performance failures and cracks in these components, which could result in the breaking away of parts which would interfere with other components and systems performing their safety functions.92 New York labels these new bases material to the NRCs licensing decision in this proceeding because they identify a threat to public health and safety, and the NRC Staff is obligated to make findings regarding the impact the proposed action will have on the public health and safety before Entergys LRA can be approved as submitted, modified, or rejected.93 C. Entergy Answer Entergy characterizes New Yorks new bases for NYS-25 as untimely in part and as rais[ing] issues beyond the scope of this proceeding, lack[ing] adequate factual and legal 90 Id. at 6.

91 Id., Additional Bases for Previously-Admitted Contention NYS-25 (Embrittlement of Reactor Pressure Vessels and Associated Internals) at 1 (Sept. 15, 2010) [hereinafter Additional Bases for NYS-25].

92 NYS-25 at 4 (citing Declaration of Dr. Richard T. Lahey, Jr. at paras. 13-14, 16-18 (Sept. 15, 2010)).

93 Id.

support, and fail[ing] to raise a genuine dispute on a material issue of law or fact.94 First, Entergy represents that there is neither a sufficiently enumerated technical or factual basis nor a specific legal or factual challenge to Entergys reactor vessel internal program, in New Yorks pleading and New Yorks experts declaration, both of which allege that Entergy does not adequately consider the synergistic aging effects of embrittlement and metal fatigue on the RPV and RPV internals.95 Likewise, Entergy urges the Board to hold that New Yorks references to certain effects and components96 (1) do not challenge any specific portion of Entergys LRA Amendment 9, (2) are beyond the scope of the originally-admitted contention, and (3) regarding control rods, are not subject to aging management review.97 Entergy also insists that New Yorks attacks on the requirements of the NRCs Generic Aging Lessons Learned (GALL) Report and Standard Review Plan for License Renewals are statements of what New York believes the NRCs policy ought to be, which is outside the scope of this proceeding. Entergy urges the Board to regard New Yorks concerns about the purported synergistic effects of RPV embrittlement and metal fatigue on the RPV and RPV internals as untimely, without adequate explanation, because, according to Entergy, it included these items in its original LRA and New York has already filed contentions dealing with embrittlement and metal fatigue in its initial hearing request.98 Second, regarding New Yorks claimed omission by Entergy of the timing of inspections to be conducted under the reactor vessel internals program, Entergy argues that this claim 94 Entergy Answer to NYS-25 at 1-2.

95 Id. at 11-14. Part of the Entergys challenge to the new bases admissibility lies in its questioning of the qualifications of Dr. Lahey to weigh in on metallurgy issues, given that he is an expert in multiphase flow and heat transfer technology, not metallurgy. Id. at 2 & n.3.

96 E.g., the intermediate shell and stub tubes, control rods, thermally-aged cast stainless steel in-core components, and boric acid corrosion of the upper RPV head. See id. at 12.

97 Id.

98 Id. at 14-16.

neither provides a factual basis nor raises a genuine dispute with respect to Entergys LRA because LRA Amendment 9 adheres to the guidance provided by the Electric Power Research Institute (EPRI) Materials Reliability Program 227 (MRP-227), which lists the frequency of inspections to be conducted for each primary plant componentssomething present in Entergys LRA which New York mistakenly asserts is missing.99 Similarly, relying on the Boards original contention admissibility decision, Entergy categorizes any asserted requirements of baseline inspections before extended operations as outside the scope of this proceeding.100 Third, in response to New Yorks claim that inspection techniques identified in LRA Amendment 9 are inadequate, Entergy states that New York does not raise a genuine dispute nor provide expert support for its specific criticisms of these alleged inadequacies, especially given that Entergy adheres to current requirements in MRP-227 which explain why different inspection techniques are used for different componentsnone of which New York acknowledges in its new bases for NYS-25.101 Fourth, Entergy asks the Board to dismiss New Yorks claim that Entergys LRA Amendment 9 lacks needed provisions for preventative actions, arguing that preventative actions are specified for RVI, although not as part of the RVI Program.102 For example, according to Entergy, the Water Chemistry ControlPrimary and Secondary Program provides for preventative action by maintaining primary water chemistry in accordance with EPRI guidelines to minimize the potential for SCC [stress corrosion cracking] and IASCC [irradiation-99 Id. at 16-17.

100 Id. at 17.

101 Id. at 18-20.

102 Id. at 21.

assisted stress corrosion cracking].103 Moreover, Entergy portrays New Yorks claimed lack of sufficient details in the LRA about future corrective actions as not launching any specific challenge to Entergys LRA because MRP-227, upon which Entergy relies, outlines specific protocol for approaching corrective actions that are consistent with Entergys required corrective action program and quality assurance program as mandated under Part 50.104 Finally, Entergy criticizes New Yorks reliance on a September 2010 NRC audit report of Entergys Vermont Yankee plant to show that Entergy will not meet its requirements under a renewed license for the reactors at Indian Point, arguing that that audit report positively evaluated Entergy and that past performance of a plant is not properly the subject of a license renewal proceeding.105 D. NRC Staff Answer The NRC Staff also asks the Board to find New Yorks additional bases for NYS-25 inadmissible because, as articulated by the Staff, New York is contesting what it thinks ought to be required for an adequate AMP as opposed to what is required of an applicant under NRC regulations.106 First, the NRC Staff argues that the challenges to the RPV in the new bases for NYS-25 do not raise a genuine dispute with Entergys LRA because the scope of [the] AMP

[submitted in LRA Amendment 9] does not include the RPV and other components of the reactor coolant system pressure boundary.107 The NRC Staff also asks the Board to find that these challenges are untimely because, without explanation, they seek for the first time to take aim at Entergys original LRA, which discussed RPV neutron embrittlement, the associated TLAAs [Time-Limited Aging Analyses, and] Entergys approach to managing the effects of RPV 103 Id.

104 Id. at 21-22.

105 Id. at 22-23.

106 NRC Staff Answer to NYS-25 at 8.

107 Id. at 8-9.

neutron embrittlement under 10 C.F.R. § 54.21(c)(1).108 Further, the NRC Staff states that there is no requirement that control rods be subject to an AMP.109 Second, because the LRA considered that the reactor vessel internals environment required consideration of neutron fluence and treated borated water at high and moderate temperatures and recognized three specific programs to deal with the effects of these factors on reactor vessel internals, the NRC Staff posits that New York has not explained which part of Entergys LRA lacks an analysis of the synergistic effects of aging.110 Third, the NRC Staff emphasizes that no regulation requires baseline inspections before the period of extended operation of the components at issue in LRA Amendment 9. According to the NRC Staff, there is nothing in the regulations that requires Entergy to implement action at any specific time, as aging can be adequately managed by taking corrective action when it is needed.111 Nor is there any requirement to take preventative action rather than corrective action, states the NRC Staff, given that the GALL Report approves of corrective measures to the exclusion of preventative measures.112 Finally, the NRC Staff argues that New York cites no requirement for New Yorks preferred inspection technique and that issues relating to Entergys ability to meet commitments made in its LRA are outside the scope of this proceeding.113 108 Id. at 9.

109 Id. at 9-10.

110 Id. at 10-11.

111 Id. at 11-12 (citing LBP-08-13, 68 NRC at 140).

112 Id. at 12.

113 Id. at 12-13.

E. New York Reply New York replies that the new bases it has submitted for NYS-25 are aimed solely at RPV internals, stresses that the new bases are within the scope of the previously-admitted contention, and clarifies that the new bases mention the RPV itself in order to reiterate out of an abundance of caution NYS-25s original complaint that Entergys LRA still lacks a valid AMP for the RPV itself.114 New York also argues that Entergys reliance on MRP-227 is subject to challenge in this proceeding because that industry-produced document has not yet been endorsed by the NRC and further argues that even if MRP-227 would be endorsed by the NRC, Entergys fulfillment of that documents suggestions would still be subject to challenge in this proceeding because it is only guidance and is not binding.115 New York also claims that it has presented a genuine dispute of material fact over Entergys ability to synergistically manage the effects of aging because Entergy has only claimed that it has several independent (as opposed to synergistic) programs that manage the effects of aging.116 Regarding each of the three aging management programs in LRA Amendment 9 cited by the NRC Staff as meeting New Yorks concerns (namely, Inservice Inspection, Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel, and Water Chemistry ControlPrimary and Secondary Program), New York asserts that each of these, by its terms, does not examine or evaluate the synergistic effects of embrittlement and fatigue leading to components failures and compromised core cooling during a transient shock event . . . .117 In the same vein, New York posits that the Reactor Vessel 114 New York NYS-25 Reply at 4-5 & n.2.

115 Id. at 6-11 (citations omitted).

116 Id. at 12-13.

117 Id. at 13-14. We note that New York generally uses the same language in attacking the three programs cited by the NRC Staff. However, for Inservice Inspection, New York complains that by its terms, it does examine or evaluate the synergistic effects of embrittlement and fatigue. Id. at 14 (emphasis added). We assume that this passage, when read in the context

Head Penetration Inspection Program (cited favorably by the NRC Staff to address New Yorks concerns) by its terms, it does not examine or evaluate the effect of a transient thermal shock on control rod penetrations and seal welds.118 Moreover, New York responds that because a reactors control rods and seal welds are located within the RPV, even MRP-227 and the GALL Report recognize that they are RPV internals and, accordingly, New York argues that these components require aging management review.119 As for its challenges to Entergys proposed inspection techniques, New York insists that it need not bring expert opinions to support its position, given that MRP-227 and the NRCs own opinions elsewhere have questioned the viability of visual testing.120 Finally, New York urges the Board to consider the new bases to NYS-25 as timely filed because they arise out of and criticize the adequacy of Entergys AMP for RPV internals, which did not exist before July 2010.121 F. Board Decision We hereby grant New Yorks Motion for Leave to add additional bases to previously admitted NYS-25 without altering or amending the contention as written.122 In its original petition to intervene, New York alleged that, with respect to the effects of aging due to embrittlement of RPVs and the associated internals, Entergy had no meaningful of New Yorks general complaint, intended to aver that the Inservice Inspection program does not wrestle with the synergistic effects of embrittlement and fatigue.

118 Id. at 14-15.

119 Id. at 15.

120 Id. at 15-17.

121 Id. at 17-18.

122 The Board expressly permitted new contentions based on LRA Amendment 9 to be filed on or before September 15, 2010. See Licensing Board Order (Granting New Yorks Motion to Extend Deadline for Filing New Contentions) (Aug. 12, 2010) at 1 (unpublished). Because NYS-25 was filed within that time period and it challenges the AMP for RPV internals in Entergys that appear for the first time in LRA Amendment 9, we deem it timely pursuant to Section 2.309(f)(2).

plan. We admitted NYS-25 based on that claim, finding that it met the requirements of 10 C.F.R. § 2.309(f)(1).123 Thereafter, Entergy submitted an amendment to its LRA which addressed claims that were within the scope of NYS-25. In response, New York filed this Motion, which claims that LRA Amendment 9 does not present an adequate AMP, and in support of this claim, New York offers the proffered new bases discussed herein.

In response, both Entergy and the NRC Staff argue that the specifics cited to by New York are not required by regulation but, in so doing, we believe they have missed the point. At issue is whether Entergy has presented an adequate AMP. The applicable regulation requires that the applicant [Entergy] shall demonstrate that . . . (iii) [t]he effects of aging on the intended function(s) will be adequately managed for the period of extended operation.124 The regulation does not specify exactly how this demonstration will be accomplished. It may well be that after a hearing we conclude that the alleged deficiencies are accurately described by New York but that, nevertheless, Entergys AMP is adequate. At this stage of the proceeding, however, we do not weigh the evidence.125 By granting New Yorks Motion, we agree that the allegations it has made flow from LRA Amendment 9, are within the scope of the contention as originally admitted, and support the existence of a genuine dispute regarding the adequacy of Entergys AMP relating to the potential embrittlement of RPV and related internals. After the hearing we will determine whether, considering all relevant factors including the new bases proffered by New York, Entergy has presented an adequate AMP. New Yorks Motion to add bases to NYS-25 is granted.

123 LBP-08-13, 68 NRC at 129-31.

124 10 C.F.R. § 54.21(c)(1).

125 See LBP-08-13, 68 NRC at 61-64 (explaining the licensing boards duties during contention admissibility).

V. NYS-37 A. Background and New York Motion NYS-37 states that:

The FSEIS discussion of energy alternatives (Chapter 8) fails to provide a meaningful analysis of energy alternatives or responses to criticism of the DSEIS, in violation of the requirements of 42 U.S.C. §§ 4331 and 4332; 10 C.F.R. §§ 51.91(A)(1), and (C), 51.92(2), 51.95(C)(4), and Part 51, Subpart A, Appendix A and Appendix B; 40 C.F.R. §§ 1052.1, 1052.2(G), 1502.9, and 1502.14; and 5 U.S.C. § 551 et seq.126 In addition to expressly incorporating New Yorks previously admitted bases from NYS-9/33, NYS-37 raises new claims that the FSEIS does not satisfy the NRCs NEPA obligations because it, inter alia, failed to (a) meaningfully consider significant new information material to non-fossil fuel alternatives; (b) failed to respond in the FSEIS to the States detailed criticism of the DSEIS; (c) failed to meaningfully analyze renewable sector generation, energy efficiency and conservation, purchased electrical power and combined heat and power; and (d) relied substantially on inaccurate information.127 Reviewing the previous contentions, we admitted NYS-9 inasmuch as it raised a genuine dispute over Entergys need to to consider energy conservation for the no-action alternative in its ER, but we found inadmissible those portions of NYS-9 that allege[d] ER deficiencies due to Entergys lack of considering energy conservation in its alternatives analysis for the defined goal of producing 2158 MWe of baseload generation.128 We later admitted NYS-33, which challenged specific portions of the DSEISs analysis addressing energy conservation and 126 State of New York Contention Concerning NRC Staffs Final Supplemental Environmental Impact Statement (Feb. 3, 2011) at 2 [hereinafter NYS-37].

127 State of New Yorks Supplement to Motion for Leave to File New and Amended Contention 37 Concerning Chapter 8 of the December 3, 2010 Final Supplemental Environmental Impact Statement (Feb. 3, 2011) at 3 [hereinafter New York Supplemental Motion for Leave to File NYS-37].

128 LBP-08-13, 68 NRC at 93.

efficiency, the viability of renewable energy resources, energy transmission capacity, and possible combinations of different energy sources to fulfill the Staffs obligations regarding the no-action alternative. We consolidated NYS-33 with NYS-9.129 Thereafter, on February 3, 2011, New York filed NYS-37,130 followed by an unopposed Motion filed nunc pro tunc to extend the page limitations for NYS-37.131 B. Entergy Answer Without waiving its arguments against the admission of NYS-9/33, Entergy does not oppose admission of NYS-37 to the extent it seeks to update or incorporate the underlying support for NYS-9/33.132 129 June 16, 2009 Licensing Board Memorandum and Order at 9, 13.

130 See New York Supplemental Motion for Leave to File NYS-37; NYS-37. New Yorks submitted its Supplemental Motion for Leave to File NYS-37 on the same day the original Motion for Leave was filed. Compare New York Supplemental Motion for Leave to File NYS-37 with State of New Yorks Motion for Leave to File New and Amended Contentions Concerning Chapter 8 of the December 3, 2010 Final Supplemental Environmental Impact Statement (Feb.

3, 2011).

131 New York State Motion for Approval of Extension of Page Limitations for Proposed Contention 37, Nunc Pro Tunc, January 31, 2011 (Feb. 23, 2011); Supplemental Certification to the State of New Yorks Motion for Approval Of Extension Of Page Limitations For Proposed Contention 37, Nunc Pro Tunc, January 31, 2011 (Feb. 23, 2011). We grant New Yorks nunc pro tunc Motion to extend the page limitations because it is unopposed and we accept New Yorks reasonable interpretation of our Scheduling Order that motions themselves are bound by the twenty-five page limit but contentions themselves are not restricted in the same manner. Cf.

July 1, 2010 Scheduling Order at para. G.1.

On March 7, 2011, Entergy filed an Answer opposing admission of NYS-37 in part while the NRC Staff filed an Answer opposing admission of NYS-37 in its entirety. Applicants Answer to New York States Contention 37 Concerning the NRC Staffs Evaluation of Energy Alternatives (Mar. 7, 2011) [hereinafter Entergy Answer to NYS-37]; NRC Staffs Answer to the State of New Yorks Motion for Leave to File a New Contention, and New Contention 37, Concerning the Final Supplemental Environmental Impact Statement (Mar. 7, 2011) [hereinafter NRC Staff Answer to NYS-37]. On March 18, 2011, New York filed its Combined Reply to Entergys and the NRC Staffs Answers. State of New Yorks Combined Reply to Entergy and NRC Staffs Answers to the States Proposed Contention 37 Concerning NRC Staffs December 2010 Final Environmental Impact Statement and its Deficient Analysis of Energy Alternatives (Mar. 18, 2011) [hereinafter New York NYS-37 Reply].

132 Entergy Answer to NYS-37 at 2, 13.

However, Entergy argues that the remainder of NYS-37 is inadmissible. Entergy portrays New Yorks positions that the FSEIS overestimates the need for power and that the FSEIS misrepresents the characteristics of the power sources essential to replacing power produced by Indian Point as outside the scope of this proceeding.133 According to Entergy, NYS-37 provides an invalid factual and legal basis for challenging the FSEISs discussion of non-fossil fuel alternatives to license renewal.134 Entergy also suggests that some of the documents relied on by New York and its experts either are speculative or undermine the likelihood that alternatives cited by New York could be adequate replacements for Indian Point.135 Similarly, Entergy stresses that, in its view, the FSEIS relies on reasonably up-to-date information, adequately takes into consideration the comments raised on the DSEIS, and has conducted the requisite thorough review of this issue.136 C. NRC Staff Answer The NRC Staff opposes admission all of NYS-37 because, according to the NRC Staff, it is untimely and does not meet the NRCs contention admissibility standards. Regarding the timeliness standard for new and amended NEPA contentions under Section 2.309(f)(2), the NRC Staff represents that New York has not demonstrated how the information and conclusion in the FSEIS regarding the no-action alternative differ significantly from those described in the DSEIS.137 Moreover, relying on Prairie Island, the NRC Staff urges the Board to view as conclusory and inadequate New Yorks explanation for the timeliness of NYS-37 under the alternative timeliness factors of Section 2.309(f)(2)(i)-(iii), given that information in documents 133 Id. at 13-14.

134 Id. at 14-17.

135 Id. at 17-21.

136 Id. at 19-24.

137 NRC Staff Answer to NYS-37 at 8-10, 14-15, 19, 22-23.

relied on by New York is dated much earlier than the publication of the FSEIS.138 Conversely, because they were not attached to New Yorks pleadings, the NRC Staff claims that the Board may not consider other documents cited by New York that were dated after publication of the FSEIS.139 The NRC Staff also opposes the admission of NYS-37 by claiming that New York could have raised aspects of NYS-37 relating to renewable energy standards, energy efficiency/energy conservation, purchased power, transmission corridors, combined heat and power projects, and non-fossil fuel alternatives either when the information regarding these issues became available or subsequent to discussion of these issues in the ER and the DSEIS.140 Under the NRCs standards for admission of nontimely contentions (Section 2.309(c)), the NRC Staff insists that New York has not made the requisite showing of good cause and will have ample opportunity through NYS-9/33 to litigate those issues raised in NYS-37.141 Turning to the admissibility of NYS-37 under Section 2.309(f)(1), the NRC Staff classifies the contention and its supporting documents as focused on possible alternatives to license renewal rather than the no-action alternative which, the staff notes, the Board explicitly rejected as outside the scope of this proceeding, as well as immaterial to the NRCs licensing decision in this proceeding.142 Further, the NRC Staff represents that the documents cited by New York as unaddressed in the FSEIS were never attached to New Yorks comments on the DSEIS, and thus, the NRC Staff argues, it was not required to include any response to those documents in 138 Id. at 10-11 & n.22, 24.

139 Id. at 11-12 nn.23, 25.

140 Id. at 19-20, 22-25.

141 Id. at 12-13.

142 Id. at 13-16, 18-19.

the FSEIS.143 Lastly, the NRC Staff asserts that New Yorks mischaracterization of information regarding land disturbance and repowered facilities shows that these claims lack basis.144 D. New York Reply New York replies that its concerns in NYS-37 were timely filed because the documents relied on by New York are not the timeliness triggers or the bases for its contention. Instead, New York reasons that the NRC Staffs analysis and conclusions in the FSEIS, much of it appearing for the first time in the FSEIS, give rise to the contention.145 According to New York, NYS-37 is not a demand for a need-for-power analysis but rather an assertion that the no-action alternative itself is inadequately analyzed in the FSEIS because the analysis relies on faulty assumptions and information describing the New York energy markets.146 Moreover, New York posits that the claims embedded in NYS-37 are material to the NRCs licensing decision in this proceeding due to the relief New York would be entitled to if it prevails on the merits, namely, the denial of Entergys LRA or the rewriting of the FSEIS.147 Finally, New York represents that the documents it relies on have either been served on the NRC Staff in this adjudicatory proceeding or in the NEPA comment process, making the NRC Staff well aware of New Yorks position.148 B. Board Decision We find that NYS-37 was timely filed and that portions of the contention are admissible.

143 Id. at 16-17.

144 Id. at 24.

145 New York NYS-37 Reply at 11-14.

146 Id. at 14-17.

147 Id. at 17-23.

148 Id. at 24.

We agree with New York that the timelessness trigger for the filling of this contention was the publication of the FSEIS. At the heart of this contention is the claim that the NRC Staff relied on outdated information and ignored well-reasoned and supported comments to the DSEIS in conducting its analysis and in reaching conclusions relating to the no-action alternative that were articulated in the FSEIS. Accordingly, we hold that this contention could not have been filed prior to the publication of the FSEIS and, after its publication, the contention was timely filed, consistent with the provisions of this Boards July 1, 2010 Scheduling Order.

After consideration of the factors discussed in the parties pleadings, NYS-37 is admitted, in part, to the extent that it updates and supersedes NYS-9/33 and to the extent that it challenges the adequacy of the discussion in the FSEIS addressing comments made regarding the environmental impact of the no-action alternative as described in the DSEIS.

New York has alleged that the discussion of the no-action alternative in the FSEIS is, for all material purposes, identical to the discussion of the no-action alternative in the DSEIS,149 a proposition with which the NRC Staff appears to agree.150 But, in addition to the previously alleged deficiencies, New York now alleges, with new supporting declarations from David Schlissel,151 Peter Lanzalotta,152 and Peter Bradford,153 that the FSEIS is deficient for failing to discuss information, published after the DSEISs issuance in December 2008, that is material to understanding the environmental impact of the no-action alternative and also that it fails to adequately address comments made to the DSEIS.154 149 NYS-37 at 9.

150 NRC Staff Answer to NYS-37 at 8-10.

151 NYS-37, Attach. 4: Declaration of David A. Schlissel (Jan. 31, 2011).

152 Id., Attach. 5, Declaration of Peter J. Lanzalotta (Feb. 1, 2011).

153 Id., Attach. 6, Declaration of Peter A. Bradford (Feb. 2, 2011).

154 NYS-37 at 8-17.

It is only these aspects of NYS-37 that we find admissible. In admitting this contention, we are not authorizing a broad-ranged inquiry into alternative scenarios and the need for power, which would be precluded by Commission regulations,155 and which we have previously excluded.156 Remembering that we are still at the contention admissibility stage, as opposed to the merits stage of this proceeding, we believe that New York has proffered sufficient information to establish the existence of a material dispute. Specifically, we have previously held and continue to hold that New York has raised a genuine issue regarding the adequacy of the evaluation of the environmental impact of the no-action alternative to the relicensing of IP2 and IP3. Our ruling here updates, but does not materially expand the scope of, this contention.

VI. RK-EC-3/CW-EC-1 In Riverkeeper, Inc.s (Riverkeepers) hearing request, Contention EC-3 (RK-EC-3),

subtitled Failure to Adequately Analyze Impacts of Spent Fuel Pools, alleged that Entergys ER did not:

[S]atisfy the requirements of NEPA, 42 U.S.C. § 4332 et seq., and NRC regulations implementing NEPA, including 10 C.F.R. § 51.45(c) and (e).

Because the ER does not adequately assess new and significant information regarding the environmental impacts of the radioactive water leaks from the Indian Point 1 and Indian Point 2 spent fuel pools on the groundwater and the Hudson River ecosystem.157 155 10 C.F.R. § 51.95(c)(2) (The supplemental environmental impact statement for license renewal is not required to include discussion of need for power or the economic costs and economic benefits of the proposed action or of alternatives to the proposed action except insofar as such benefits and costs are either essential for a determination regarding the inclusion of an alternative in the range of alternatives considered or relevant to mitigation.).

156 June 16, 2009 Licensing Board Order at 11-13; LBP-08-13, 68 NRC at 92-93. We find New Yorks concerns about the FSEISs analysis of certain non-fossil alternatives untimely, given that these issues go beyond those raised by New York in its contentions on the DSEIS and New York could have raised them earlier.

157 LBP-08-13, 68 NRC at 188.

In Hudson River Sloop Clearwater, Inc.s (Clearwaters) hearing request, Contention EC-1 (CW-EC-1) also asserted a Failure of [Entergys] ER to Adequately Address the Impacts of Known & Unknown Leaks.158 We admitted both of these contentions, and consolidated them as Riverkeeper EC-3 and Clearwater EC Spent Fuel Pool Leaks (RK-EC-3/CW-EC-1).159 On May 28, 2009, we permitted Riverkeeper and Clearwater to apply RK-EC-3/CW-EC-1 to the NRC Staffs analysis in the DSEIS.160 On February 3, 2011, Riverkeeper and Clearwater moved to apply RK-EC-3/CW-EC-1 to the FSEIS.161 Without waiving their objections to the merits or the original admissibility of the consolidated contention, Entergy and the NRC Staff do not oppose Riverkeepers and Clearwaters request.162 The Board hereby grants Clearwaters and Riverkeepers Motion. RK-EC-3/CW-EC-1 shall apply to Entergys ER, the NRC Staffs DSEIS, and the NRC Staffs FSEIS.

VII. CW-RK WASTE CONFIDENCE RULE CONTENTIONS A. Background On January 24, 2011, Clearwater and Riverkeeper jointly filed new contentions:

Clearwater EC-8/Riverkeeper EC-6 (CW-EC-8/RK-EC-6), Clearwater SC-2/Riverkeeper TC-3 158 Id. at 191.

159 Id. at 190-91, 193-94, 220.

160 Licensing Board Order (Applying Consolidated Contention Riverkeeper EC-3/Clearwater EC-1 to the NRC Staffs Draft Supplemental Environmental Impact Statement) (May 28, 2009) at 1-2 (unpublished).

161 Riverkeeper, Inc. and Clearwater, Inc. Challenge to NRC Staffs Assessment of Impacts of Spent Fuel Pool Leaks in the Final Supplemental Environmental Impact Statement (Feb. 3, 2011) at 3.

162 Applicants Answer to Riverkeeper, Inc. and Hudson River Sloop Clearwater, Inc.s Filing Regarding Consolidated Contention Riverkeeper EC-3/Clearwater EC-1 (Mar. 7, 2011) at 2; NRC Staffs Answer to Riverkeeper, Inc. and Clearwater, Inc.s Challenge to NRC Staffs Assessment of Impacts of Spent Fuel Pool Leaks in the Final Supplemental Environmental Impact Statement (Mar. 7, 2011) at 2 & n.6.

(CW-SC-2/RK-TC-3), Clearwater EC-9/Riverkeeper EC-7 (CW-EC-9/RK-EC-7), and Clearwater SC-3/Riverkeeper TC-4 (CW-SC-3/RK-TC-4).163 B. Clearwater and Riverkeeper Joint Motion Clearwaters and Riverkeepers four joint contentions come in two groups, with each group containing one environmental contention and one safety contention: the first group presumes that the recent updates to the NRCs Waste Confidence Rule are invalid (CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3), while the second group is intended to apply in the event 163 Hudson River Sloop Clearwater, Inc. and Riverkeeper, Inc.s Joint Motion for Leave to Add New Contentions Based Upon New Information and Petition to Add New Contentions (Jan. 24, 2011) [hereinafter CW-RK Joint Contentions]. On February 10, 2011, New York filed an Answer supporting these new contentions. State of New York Answer in Support of the Admission of Clearwater and Riverkeepers Proposed Waste Confidence Contentions: Clearwater EC-8, SC-2, EC-9, SC-3, Riverkeeper EC-6, TC-3, EC-7, TC-4 (Feb. 10, 2011) [hereinafter New York Answer to CW-RK Joint Contentions]. On February 18, 2011, Entergy and the NRC Staff filed Answers opposing admission of Clearwaters and Riverkeepers joint new contentions.

Applicants Answer to Hudson River Sloop Clearwater, Inc. and Riverkeeper, Inc.s New Contentions Concerning the Waste Confidence Rule (Feb. 18, 2011) [hereinafter Entergy Answer to CW-RK Joint Contentions]; NRC Staffs Answer to Hudson River Sloop Clearwater, Inc. and Riverkeeper, Inc.s Joint Motion and Petition to Add New Contentions (Feb. 18, 2011)

[hereinafter NRC Staff Answer to CW-RK Joint Contentions]. On February 25, 2011, along with their Joint Combined Reply to Entergys and the NRC Staffs Answers, Clearwater and Riverkeeper filed a Petition for Exemption from or Waiver of Restrictions Contained in 10 C.F.R.

§ 51.23(b) (Exemption/Waiver Petition). Combined Reply to NRC Staff and Entergys Answers in Opposition to Clearwater and Riverkeepers Joint Motion for Leave and Petition to Add New Contentions (Feb. 25, 2011) [hereinafter CW-RK Joint Contentions Reply]; Hudson River Sloop Clearwater, Inc. and Riverkeeper, Inc.s Petition for Exemption from or Waiver of Restrictions Contained in 10 C.F.R. § 51.23 (Feb. 25, 2011) [hereinafter CW-RK Waiver/Exemption Petition].

On March 4, 2011, Entergy filed a Motion to Strike regarding Clearwaters and Riverkeepers Exemption/Waiver Petition, portions of Clearwaters and Riverkeepers Reply, and documents filed with Clearwaters and Riverkeepers Reply. Applicants Motion to Strike (Mar. 4, 2011) [hereinafter Entergy Motion to Strike]. The NRC Staff supports Entergys Motion to Strike, while Clearwater and Riverkeeper oppose Entergys Motion to Strike. NRC Staffs Answer to Applicants Motion to Strike Hudson River Sloop Clearwater, Inc. and Riverkeeper, Inc.s Petition for Waiver and Portions of their Combined Reply to Answers to their New Waste Confidence Contentions (Mar. 14, 2011) [hereinafter NRC Staff Answer to Entergy Motion to Strike]; Petitioners Opposition to Entergys Motion to Strike (Mar. 21, 2011) [hereinafter CW-RK Answer to Entergy Motion to Strike]. The Board granted Clearwater and Riverkeeper an extension of time within which to file their Answer responding to Entergys Motion to Strike. See Licensing Board Order (Granting New Yorks and Clearwaters/Riverkeepers Motions for Extensions of Time) (Mar. 11, 2011) at 2 (unpublished).

the Board finds the Waste Confidence Rule valid (CW-EC-9/RK-EC-7 and CW-SC-3/RK-TC-4).164 As for the first group of Waste Confidence Rule contentions from Clearwater and Riverkeeper (those presuming the Rule is invalid), the environmental contention CW-EC-8/RK-EC-6 alleges:

The environmental analysis carried out to assess the potential impacts of relicensing Indian Point Units 2 and 3 is inadequate because it provides an insufficient analysis of the potential impacts of generating more spent fuel leading to additional waste storage on site, the alternative methods of accomplishing such storage, and potential alternatives to additional waste storage on the site, including the no-action alternative.165 The safety contention, CW-SC-2/RK-TC-3 alleges:

The license renewal application requesting the relicensing of Indian Point Units 2 and 3 is inadequate because it provides insufficient analysis of the aging management of the dry casks and spent fuel pools that could be used to store waste on the site in the long term. In addition, both the application and the NRC Staff have failed to establish that any combination of such storage will provide adequate protection of safety over the long term.166 In the event that the Board finds the Waste Confidence Rule valid, CW-EC-9/RK-EC-7 asserts as an environmental contention that:

The environmental analysis carried out to assess the potential impacts of relicensing Indian Point Units 2 and 3 is inadequate because it provides an insufficient analysis of the potential impacts of generating more spent fuel during the period commencing 60 years after the expiration of each license. Missing elements include analysis of: a) the long term impact of additional waste storage on site; b) the alternative methods of accomplishing such storage; and c) potential alternatives to additional waste storage on the site, including the no-action alternative.167 As a safety contention, CW-SC-3/RK-TC-4 asserts:

164 CW-RK Joint Contentions at 17.

165 Id.

166 Id. at 18.

167 Id.

The license renewal application requesting the relicensing of Indian Point Units 2 and 3 is inadequate because it provides insufficient analysis of the aging management of the dry casks and spent fuel pools that could be used to store waste on the site during the period commencing 60 years after the date the license expires at each unit. In addition, both the applicant and the NRC Staff have failed to establish that any combination of such storage will provide adequate protection of safety over the long term.168 Entergy and NRC Staff express numerous reasons for opposing the admission of Clearwaters and Riverkeepers joint contentions relating to the on-site storage of spent fuel. As threshold matters, both parties argue that the safety contentions (i.e., CW-SC-2 /RK-TC-3 and CW-SC-3/RK-TC-4) were not timely filed, that these contentions challenge NRC regulations, and that portions of Clearwaters and Riverkeepers Reply, which includes a waiver petition/exemption request, should be stricken from the record.169 For reasons discussed below, we find that the contentions were timely and that Entergys Motion to Strike portions of the Intervenors Reply should be denied. Nevertheless, none of these new contentions filed jointly by Clearwater and Riverkeeper is admissible because they are, inter alia, direct challenges to the agencys regulations.

Following a discussion of timeliness and Entergys Motion to Strike, the admissibility of these contentions is reviewed starting with CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3, followed by CW-EC-9/RK-EC-7 and CW-SC-3/RK-TC-4.

1. Timeliness Timeliness is a threshold that must be cleared for any proffered new or amended contention.170 Clearwaters and Riverkeepers joint contentions based on the impact of the Commissions recent update to its Waste Confidence Decision (WCD Update)171 were filed 168 Id.

169 See generally NRC Staff Answer to Entergy Motion to Strike; Entergy Motion to Strike; Entergy Answer to CW-RK Joint Contentions at 12-26; NRC Staff Answer to CW-RK Joint Contentions at 19-35.

170 See 10 C.F.R. § 2.309(c)(1), (f)(2); July 1, 2010 Scheduling Order at para. F.2.

on January 24, 2011, which is within thirty days after the publication date of the Commissions final WCD Update on December 23, 2010. In this updated Rule, the Commission addressed both the safety and environmental aspects of spent fuel storage in making a generic determination that, if necessary, spent fuel generated in any reactor can be stored safely and without significant environmental impacts for at least 60 years beyond the licensed life for operation.172 Contrary to both Entergys and the NRC Staffs position that the safety contentions (i.e., CW-SC-2/RK-TC-3 and CW-SC-3/RK-TC-4) are untimely,173 the contentions addressing the WCD Update meet the thirty day deadline in our July 1, 2010 Scheduling Order,174 they were filed within thirty days of the publication of the WCD Update, and are therefore timely inasmuch as they have arisen from information in the WCD Update.

2. Entergy Motion to Strike Portions of Clearwaters and /Riverkeepers Reply Entergy has moved first to strike all of the Gundersen and Greene Declarations and Waiver Petition/Exemption Request that Clearwater and Riverkeeper attached to their Reply to Entergys and NRC Staffs Answers to their Joint Contentions, as well as other portions of their Reply dealing with selected safety issues of spent fuel storage addressed in CW-SC-2/RK-TC-3 and CW-SC-3/RK-TC-4.175 The NRC Staff supports Entergys Motion.176 Entergy alleges that Clearwaters and Riverkeepers Reply and Gundersen Declarations (that present technical disputes with the Entergys aging management of spent fuel storage are new arguments and an 171 Consideration of Environmental Impacts of Temporary Storage of Spent Fuel After Cessation of Reactor Operation, 75 Fed. Reg. 81,032 (Dec. 23, 2010).

172 Id. at 81,036; see also 10 C.F.R. § 51.23(a).

173 Entergy Answer to CW-RK Joint Contentions at 3, 16-18, 23; NRC Staff Answer to CW-RK Joint Contentions at 19-20, 32-35.

174 July 1, 2010 Scheduling Order at para. F.2.

175 Entergy Motion to Strike at 6-10.

176 See NRC Staff Answer to Entergy Motion to Strike at 7.

impermissible attempt to cure the deficiencies in Petitioners safety contentions.177 On the opposite end of the spectrum, the Intervenors maintain that it is appropriate for them to amplify issues presented in the original contention without qualification.178 The purpose of a reply is to allow a petitioner to respond to an opposing partys legal and factual arguments raised in its answer to proposed contentions. A reply cannot be used to expand the scope of the contention, but instead must focus narrowly on the legal or factual arguments first presented in the original petition or raised in the answers to it.179 Statements acceptable for replies must meet two criteria: (1) they must be within the scope of the contention as originally filed, and (2) they must address factual or legal statements raised in the opposing parties answers. However, in its Motion to Strike, Entergy, supported by NRC Staff, seeks to broaden the criteria to include a prohibition against all new arguments.180 Entergy does note that, because it is not allowed to respond to a reply, principles of fairness mandate that a petitioner restrict its reply brief to addressing issues raised by the Applicants or the NRC Staffs Answers.181 While this point is valid, it falls well short of prohibiting a petitioner from raising all new arguments. As long as new statements are within the scope of the initial contention and directly flow from and are focused on the issues and arguments raised in the Answers, fairness is achieved through the consideration of these newly expressed arguments.

In this instance, Entergy argues that portions of Intervenors Reply contains new arguments and relies on new factual information, including the Gundersen Declaration, that was not submitted with the New Contentions, and that for the first time, reference and attempt to raise technical disputes with certain portions of Entergys aging management program for the 177 Entergy Motion to Strike at 7.

178 CW-RK Answer to Entergy Motion to Strike at 4-5.

179 Nuclear Mgmt. Co., LLC (Palisades Nuclear Plant), CLI-06-17, 63 NRC 727, 732 (2006).

180 See Entergy Motion to Strike at 5; NRC Staff Answer to Entergy Motion to Strike at 4.

181 Entergy Motion to Strike at 5.

Indian Point spent fuel pools.182 Entergy goes on to challenge Intervenors citation of NRC Information Notice 2009-26 with the position that this document was new information that was first referenced in the Intervenors Reply.183 Neither Entergy nor NRC Staff has provided any support showing that the Intervenors statements are not within the scope of the original contention or that the information does not address issues raised in Entergys and the NRC Staffs Answers. While the arguments relating to the safety contention in Clearwaters and Riverkeepers Reply are more focused than in their original contention, they are consistent with the statement of the contention and acceptable as counterpoint to the Answers provided by Entergy and the NRC Staff.184 Specifically, the original contention addresses the adequacy of aging management of the dry casks and spent fuel pools,185 allegations that were challenged by the Applicant and NRC Staff in their Answers.186 Therefore, Energys Motion to Strike these portions of the Petitioners Reply is denied.187 Second, Entergy, supported by NRC Staff, also moves to strike Clearwaters and Riverkeepers Motion for exemption to, or waiver from, the rules as applied to the Intervenors position that the updated Waste Confidence Rule is invalid (as expressed in CW-EC-8/RK-EC-6 182 Id. at 6.

183 Id. at 6-7.

184 We note that this case is distinguishable from such cases as Duke Energy Corp. (McGuire Nuclear Station, Units 1 and 2; Catawba Nuclear Station, Units 1 and 2), CLI-03-17, 58 NRC 419, 428-29 (2003) (internal citations omitted), where the intervenors attempted to add new bases or new issues that simply did not occur to [them] at the outset. See also Louisiana Energy Serv., L.P. (National Enrichment Facility), CLI-04-25, 60 NRC 223, 224-25 (2004)

(rejecting attempt to raise new claims for the first time in reply brief).

185 See CW-RK Joint Contentions at 18.

186 Entergy Answer to CW-RK Joint Contentions at 16-26; NRC Staff Answer to CW-RK Joint Contentions at 28-35.

187 Allegations by Entergy and NRC Staff that the Intervenors failed to address the criteria in 10 C.F.R. § 2.309(c)(1) and (f)(2) are irrelevant because statements in the Intervenors Reply do relate to the opposing parties Answers and are therefore neither new nor untimely filed.

and CW-SC-2/RK-TC-3), including the supporting Declarations of Greene and Gundersen.188 Clearly, the Intervenors are raising a new strategy in their Reply that was not part of these original contentions and that does not respond to issues raised in Entergys or the NRC Staffs Answers.189 The merits of this Motion for exemption and waiver and the attached declarations are discussed as an independent Motion in the following section.

C. CW-EC-8/RK-EC-6 and CW-SC-2/RK TC-3 Admissibility and Exemption/Waiver Request Denial In Clearwaters and Riverkeepers CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3, they have effectively repeated the same arguments that Clearwater advanced in its earlier petition for EC-7 and SC-1 relating to inadequacies in the Indian Point environmental analysis and aging management review for long-term spent fuel storage based, in part, on Commission action on its draft WCD Update.190 Here, they are referring to the same inadequacies due to the invalidity of the final WCD Updates sidestepping of the statutory mandate of NEPA.191 As a result of its review of Clearwaters previous petition for EC-7 and SC-1, this Board certified the question to the Commission as to whether the Waste Confidence Rule remain[ed]

viable despite the Administrations decision to abandon Yucca Mountain.192 In its response to our certification, the Commission emphasized that, in regard to onsite storage of spent fuel, it has chosen to proceed generically through the rulemaking process - that is, the Waste 188 Entergy Motion to Strike at 8-10; NRC Staff Answer to Entergy Motion to Strike at 5-6.

189 While referencing this Motion in their Reply and filing it at the same time as their Reply to Entergys and the NRC Staffs Answers, Clearwater and Riverkeeper submitted this request as a separate filing. See CW-RK Waiver/Exemption Petition.

190 Hudson River Sloop Clearwater, Inc.s Motion for Leave to Add a New Contention Based Upon New Information (Oct. 26, 2009); see also CLI-10-19, 72 NRC __, __ (slip op.) (July 8, 2010); Licensing Board Memorandum and Order (Certification to the Commission of a Question Relating to the Continued Viability of 10 C.F.R. § 51.23(b) Arising From Clearwaters Motion for Leave to Admit New Contentions) (Feb. 12, 2010) (unpublished) [hereinafter Licensing Board Certification Memorandum and Order].

191 CW-RK Joint Contentions at 17-18.

192 Licensing Board Certification Memorandum and Order at 26.

Confidence Rule, codified at 10 C.F.R. § 51.23 - instead of litigating issues case-by-case in adjudicatory proceedings.193 As we have previously noted, it has been the clear guidance . . .

[from the Commission] that challenges to the Waste Confidence Rule must be made in the context of a rulemaking, not in the context of an adjudicative proceeding.194 The Commission also reiterated its position that: (1) it would not be productive and would be contrary to longstanding policy to litigate the impacts of on-site storage of spent fuel when these issues can be resolved generically, and (2) if Intervenors are dissatisfied with this generic approach, their relief cannot be addressed through adjudication but rather through the rulemaking process.195 The update to the generic assessment for spent fuel storage has now been completed and the ban against raising issues associated with the storage of spent fuel remains. The WCD Update includes a position of confidence that spent fuel can be stored safely and without significant environmental impacts. The Intervenors allegations in CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3 that the WCD Update is invalid are a direct challenge to an NRC rule (i.e., the WCD Update as manifested by 10 C.F.R. § 51.23), thus rendering these contentions inadmissible pursuant to 10 C.F.R. § 2.335(a).196 In conjunction with their Reply to the Answers filed by Entergy and the NRC Staff, Clearwater and Riverkeeper seek either an exemption from regulations pursuant to 10 C.F.R.

§ 51.6 or a waiver of the regulations in accordance with 10 C.F.R. § 2.335(b) for CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3.197 We have said that we will use a multitude of factors in evaluating the timeliness of a waiver petition, inter alia, the nature of the petition and the time 193 CLI-10-19, 72 NRC at __ (slip op. at 2).

194 Licensing Board Certification Memorandum and Order at 22.

195 CLI-10-19, 72 NRC at __ (slip op. at 3).

196 See Licensing Board Certification Memorandum and Order at 22, app. A.

197 See CW-RK Waiver/Exemption Petition at 2-10.

elapsed between when the petitioner learned of the matters that gave rise to the request and when the petition is filed.198 We deny Clearwaters and Riverkeepers Exemption/Waiver Petition as untimely because it was not submitted with these contentions when they were originally filed, as it could and should have been, without any explanation for the late filing.

Specifically, this exemption/waiver was not sought until after Intervenors received the Answers filed by Entergy and the NRC Staff. The Intervenors should have recognized the need in their initial filing for an alternative procedure that requests an exemption or rule waiver or exemption for admission of CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3, and that it would be unfair to raise the same issue in a waiver petition or exemption request for the first time in a reply without affording opposing parties an opportunity to respond to what are common issues among the waiver petition, the exemption request, and the contentions.

Even ignoring the untimely nature of this Exemption/Waiver Petition, Clearwater and Riverkeeper have not established the legal basis for the granting of an exemption from 10 C.F.R. § 51.23(b) using the provisions of 10 C.F.R. § 51.6. For the Board to accept the argument proffered by the Intervenors, it would make the waiver provisions of 10 C.F.R. § 2.335 superfluous, and we must read the exemption regulation in pari materia with the waiver regulation. We conclude that 10 C.F.R. § 51.6 should not to be used in the admission of contentions in an adjudicatory proceeding (but instead reserved for an applicants relief from regulatory requirements), in light of the option concurrently available to a purportedly aggrieved petitioner for waiver pursuant to 10 C.F.R. § 2.335.

In support of their waiver request, Clearwater and Riverkeeper repeat the same arguments they make in their contentions, without demonstrating site-specific circumstances at Indian Point that warrant granting the waiver of the regulation set out at 10 C.F.R. § 51.23(b). In 198 Licensing Board Memorandum and Order (Scheduling Prehearing Conference and Ruling on New York States Motion Requesting Consideration of Additional Matters) (Dec. 18, 2008) at 4 (unpublished).

our view, the issues raised by the Intervenors apply to all nuclear reactor sites. Based on this, we find that Clearwater and Riverkeeper have not made a prima facie showing that application of 10 C.F.R. § 51.23(b) would not serve its intended purpose at Indian Point.199 Also, we find that it would be redundant to ask the Commission to again look at the same question here that it addressed in CLI-10-19 for Clearwaters Contentions EC-7 and SC-1.

Earlier in this proceeding, the Commission, consistent with precedent, reiterated that the environmental and safety impacts of waste storage are not to be addressed in a license renewal proceeding.200 Its most recent position (as expressed in CLI-10-19), while written to address our certification for Clearwaters Contentions EC-7 and SC-1, applies equally to the decision that must be reached on the new contentions. Stated another way, the issues that would be reviewed should a prima facie case be found in the instant waiver request, have already been addressed by the Commission in CLI-10-19.

In summary, we (1) hold that CW-EC-8/RK-EC-6 and CW-SC-2/RK-TC-3 are inadmissible, (2) deny, for lateness and lack of authority, Clearwaters and Riverkeepers request for an exemption of the rules in accordance with 10 C.F.R. § 51.6, and (3) in addition to being untimely, find that the Intervenors have not made a prima facie showing that the application of 10 C.F.R. § 51.23(b) would not serve its intended purpose and, accordingly, conclude that a waiver should not be granted.

D. CW-EC-9/RK-EC-7 and CW-SC-3/RK-TC-4 Admissibility The remaining contentions relating to the WCD Update, CW-EC-9/RK-EC-7 and CW-SC-3/RK-TC-4, also challenge the Rule, but are specifically applied to an alleged gap (i.e., the period after sixty years from license expiration) in the environmental and safety analyses for the long-term storage of spent fuel at Indian Point.

1. Alleged Gap in the Waste Confidence Decision Update 199 See 10 C.F.R. § 2.335(c)-(d).

200 CLI-10-19, 72 NRC at __ (slip op. at 3).

The heart of the Intervenors arguments in CW-EC-9/RK-EC-7 and CW-SC-3/RK-TC-4 lies in their opinion that a gap in the scope of Section 51.23(a) emerged with the promulgation of the WCD Update on December 23, 2011. The Intervenors maintain that the gap exists because the Commissions revised generic determination of no significant impact is limited to a sixty-year timeframe following the period of cessation of operations including any extension associated with the period of license renewal.201 Contrary to this position, the updated 10 C.F.R. § 51.23(a) states that the Commission generically determined that, if necessary, spent fuel generated in any reactor can be stored safely and without significant environmental impacts for at least 60 years beyond the licensed life for operation and believes there is reasonable assurance that sufficient mined geologic repository capacity will be available to dispose of the commercial high-level radioactive waste and spent fuel generated in any reactor when necessary.202 The modifiers at least, and, when necessary, in the final rule negate any allegation of a gap in the regulatory timeframe covered by the WCD Update and the environmental assessment supporting that decision.

It is correct that the Commission only considered sixty years of storage beyond the license renewal period in its generic safety and environmental determinations in the WCD Update. But, consistent with historic practice, the Commission has stated that it will revisit the Waste Confidence Rule as this time frame is approached.203 And, no matter how Clearwater and Riverkeeper try to communicate their arguments, the fact still remains that the Commission has expressed confidence that a geologic repository will be available when necessary, that waste can be stored safely and without significant environmental impacts for at least sixty years beyond the term of a renewed license, and that the Commission will revisit its decision, as it has 201 CW-RK Joint Contentions at 33.

202 10 C.F.R. § 51.23(a) (emphasis added).

203 75 Fed. Reg. at 81,035.

done in the past, if it appears that this timeframe will expire. Nothing in this approach indicates a gap in the time period addressed by the WCD Update.

2. Specific NEPA-Related Issues of CW-EC-9/RK-EC-7 Clearwaters and Riverkeepers proposed NEPA contentions CW-EC-9/RK-EC-7 allege that the environmental analysis of impacts from relicensing of IP2 and IP3 is inadequate because that analysis only applies to the sixty-year period after the end of the license renewal period. As noted above, the Commission has expressed its view that a repository will be available when necessary and that the WCD will be revisited as the sixty-year period nears its end.

Furthermore, the update left intact the statement in Section 51.23(b) that, within the scope of the generic determination in paragraph (a) of that regulation, no discussion of any environmental impact of spent fuel storage . . . is required in any environmental report, environmental impact statement, environmental assessment or other analysis prepared in connection with the issuance or amendment of an operating license for a nuclear power reactor under parts 50 and 54 of this chapter.204 The Environmental Assessment (EA) supporting the finding of no significant impact for the additional thirty-year period is part of this WCD Update.205 Based on this, any challenge to the WCD Update is a direct challenge to NRC regulations and, accordingly, is not within the scope of this license renewal proceeding for IP2 and IP3. This holding is consistent with the Commissions recent decision on similar contentions from Clearwater (EC-7 and SC-1).206 The Intervenors maintain that the exclusion in Section 51.23(b) is limited to the scope of 51.23, which in turn is limited to 60 years after license expiration.207 Nevertheless, the fact 204 10 C.F.R. § 51.23(b).

205 75 Fed. Reg. at 81,033.

206 See CLI-10-19, 72 NRC at __ (slip op. at 2-3).

207 CW-RK Joint Contentions Reply at 11.

remains that the Commission has expressed confidence that a geologic repository will be available when necessary and that waste can be stored safely and without significant environmental impacts for at least sixty years beyond the term of a renewed license. As stated supra, any challenges to the Commissions WCD Update must be addressed through rulemaking. It cannot be attacked in this license renewal proceeding.208 Clearwater and Riverkeeper note that the Commission has directed the Staff to assess the environmental impact of long term storage for up to 120 years, and thus claim that this assessment must be performed on a site-specific basis prior to issuance of an extended license for Indian Point.209 However, the Commission directed this study so that it will have timely information to assess the possible need for adjustments to its WCD as the end of the sixty-year period approaches.210 Because there is no gap in the current WCD Update, the Commission has found no need to complete this study at this time. As Clearwater and Riverkeeper acknowledge,211 the Commissions WCD has been under constant review for decades and continues to be an ongoing, evolving process. We conclude that the recent initiation of this assessment of the impacts of such long-term storage has no bearing on this license renewal proceeding.

New York supported CW-EC-9/RK-EC-7, using similar arguments to those expounded by Clearwater and Riverkeeper, including the need to assess the safety and environmental assessment of spent fuel storage for the post-sixty year period.212 New York argues that 10 C.F.R. § 51.23(b) does not bar Clearwater[s] and Riverkeepers contentions because the 208 CLI-10-19, 72 NRC at __ (slip op. at 3).

209 CW-RK Joint Contentions at 39.

210 75 Fed. Reg. at 81,035.

211 Cf. CW-RK Joint Contentions at 12-16.

212 New York Answer to CW-RK Joint Contentions at 7.

period following the term of the reactor operating license or amendment and within the scope of the generic determination in paragraph (a) of this section from Section 51.23(b) refer to the sixty-year period stated in 10 C.F.R. § 51.23(a),213 and the failure of the NRC Staff to complete the analysis for the FSEIS beyond that period is a violation of NEPA and the Atomic Energy Act (AEA).214 As with Clearwaters and Riverkeepers position, New Yorks arguments are negated by the Commissions finding that a waste repository will be available when necessary and that the Commission will continue to reassess its WCD Update as the sixty-year period nears an end.

Clearwaters and Riverkeepers contentions are not admissible because they constitute a direct challenge to NRC regulations and are thus not within the scope of this proceeding.215 New York notes that NRC Staff relies on the wrong version of 10 C.F.R. § 51.23 to assume that a high level waste repository will be available by 2025, even though NRC Staff knew full well that the rule would be changed within days of the FEISs issuance.216 While this assertion might be true, given that neither Entergy nor the NRC Staff chose to address this claim in their Answers and the chronology given by New York is plausible, it was not cited by Clearwater and Riverkeeper in their original contention. For New York to raise it now, it should have addressed the requirements for timely filings presented in 10 C.F.R. § 2.309(f)(2), and, if needed, timely filings in 10 C.F.R. § 2.309(c).

E. Specific Safety-Related Issues of CW-SC-3/RK-TC-4 This safety related contention alleges that the LRA is inadequate because it provides insufficient analysis of the aging management of the dry casks and spent fuel pools that could 213 Id. at 10 (emphasis added).

214 Id. at 11-22.

215 See 10 C.F.R. §§ 2.335(a), 2.309(f)(1)(iii).

216 Id. at 17.

be used during the post-sixty-year period after the license renewal term. Most of Clearwaters and Riverkeepers discussion relating to this safety contention is a repeat of the arguments they presented for their NEPA-related contentions dealing with issues commencing sixty years after the license renewal period. In dealing with the safety of spent fuel storage, this contention is inadmissible as a direct challenge to the WCD Update217 and, in derogation of 10 C.F.R.

§ 2.309(f)(1)(iii), is not within the scope of this license renewal proceeding .

In their Joint Motion for Leave to file these contentions, Clearwater and Riverkeeper make numerous allegations attacking the adequacy of the Commissions WCD Update that they contend apply to both the Motions NEPA- and safety-related issues, including the NRCs allegedly inappropriate reliance on the WCD, the Commissions alteration of part of the Waste Confidence Rule, and the need for the NRC, as part of its license renewal review in this proceeding, to complete additional site-specific review for the post-sixty-year period.218 In a broad fashion, Clearwater and Riverkeeper attempt to justify the timeliness of the contentions by pointing out that the WCD Update is new and significant information, to discuss how the new contentions are within the scope of license renewal, and to provide general examples of multiple material disputes raised by these allegations.219 All of these positions are presented by these Intervenors as overarching issues applicable to both their NEPA- and safety-related contentions.

However, how these arguments relate to their contention that Entergy has not provided sufficient analysis of aging management for the long-term storage of spent fuel is not adequately explained. Clearwater and Riverkeeper have not provided any specific allegations addressing the adequacy of Entergys aging management of these storage alternatives for the license renewal period. In fact, the Intervenors fail to mention the components of the spent fuel 217 See 10 C.F.R. § 2.335(a).

218 See CW-RK Joint Contentions at 18-40.

219 Id. at 40-47.

pool that have been discussed in Entergys AMP.220 Nor, as NRC Staff points out, did they cite any regulation that requires the aging management program to be extended more than sixty years after the term of the license when all other systems, structures, and components need only address aging management for the term of the license extension.221 As a result, the Intervenors have failed to provide support for why these arguments have any bearing on the required safety analysis of aging management required for license renewal.

F. Board Decision The WCD Update has examined the safety and environmental impacts of on-site storage of spent fuel pending final off-site disposal, rendering it inappropriate for license renewal proceedings to litigate this issue. Accordingly, we find that Clearwaters and Riverkeepers proposed contentions CW-EC-8/RK-EC-6, CW-SC-2/RK-TC-3, CW-EC-9/RK-EC-7, and CW-SC-3/RK-TC-4 are direct challenges to NRC regulations and are therefore outside the scope of this license renewal proceeding for IP2 and IP3 pursuant to 10 C.F.R. § 2.309(f)(1)(iii).

Accordingly, these proposed contentions are inadmissible.

VIII. AMENDED CW-EC-3 (CW-EC-3A)

A. Procedural Background We admitted Clearwater EC-3 (CW-EC-3) to the extent it claimed that Entergys ER

[was] deficient because it d[id] not supply sufficient information from which the Commission

[could] properly consider, and publicly disclose, environmental factors that may cause harm to 220 See Entergy Answer to CW-RK Joint Contentions at 21 (referencing Indian Point Energy Center License Renewal Application Technical Information at tbls. 3.3.2-1, 3.5.2-3 (Apr. 2007)

[hereinafter LRA AMP]); NRC Staff Answer to CW-RK Joint Contentions at 30-31 (referencing LRA AMP at tbl. 3.5.2-3).

221 NRC Staff Answer to CW-RK Joint Contentions at 31 (referencing 10 C.F.R. § 50.54(bb)).

minority and low-income populations that would be disproportionate to that suffered by the general population.222 On February 3, 2011, Clearwater moved to amend and extend CW-EC-3.223 Clearwaters proposed amendment, labeled herein as CW-EC-3A, first alleges that Entergys Environmental Report and the Final Supplemental Environmental Impact Statement contain seriously flawed environmental justice [EJ] analyses that do not adequately assess the impacts of relicensing Indian Point on the minority, low-income and disabled populations in the area surrounding Indian Point.224 Clearwater framed this claim as a technical change to the admitted CW-EC-3, in that it adds to the admitted contention the charge that the FSEISs discussion of EJ is deficient for its reliance on a generic analysis and its failure to look at the impact from emergency planning on EJ populations.225 In addition, for the first time CW-EC-3A alleges that the assessment of the impact of the no-action alternative on potentially affected environmental justice populations is inadequate, and that the assessment of the impact of adding closed cycle cooling on air quality and on potentially affected local environmental justice populations is inadequate.226 According to 222 LBP-08-13, 68 NRC at 201 (citing Sys. Energy Res., Inc. (Early Site Permit for Grand Gulf ESP Site), CLI-05-04, 61 NRC 10, 13 (2005)).

223 Motion for Leave to Amend and Extend Contention EC-3 Regarding Environmental Justice and Petition to Do So (Feb. 3, 2011) [hereinafter Amended CW-EC-3]. On March 7, 2011, Entergy and the NRC Staff filed Answers supporting in part and opposing in part the amendment of CW-EC-3. Applicants Answer to Hudson River Sloop Clearwater, Inc.s Amended Environmental Justice Contention (Mar. 7, 2011) [hereinafter Entergy Answer to Amended CW-EC-3]; NRC Staffs Answer to Amended and New Contention (EC-3) Filed by Hudson River Sloop Clearwater, Inc. Concerning the Final Supplemental Environmental Impact Statement (Mar. 7, 2011) [hereinafter NRC Staff Answer to Amended CW-EC-3]. Clearwater replied to Entergys and the NRC Staffs Answers on March 21, 2011. Combined Reply to NRC Staff and Entergys Answers in Opposition to Clearwaters Motion for Leave and Petition to Amend Contention EC-3 (Mar. 21, 2011) [hereinafter Amended CW-EC-3 Reply].

224 Amended CW-EC-3 at 15 (emphasis in original omitted).

225 See id. at 3, 19.

226 Id. at 16.

Clearwater, these new claims regarding the impacts of the no-action alternative, and from adding closed-cycle cooling, arise because the NRC did not independently evaluate comments to the DSEIS made by organizations supportive of relicensing Indian Point. Clearwater claims these groups are funded by Entergy and exaggerate the negative air quality impacts from the no-action alternative.227 Entergy does not oppose the admission of CW-EC-3A to the extent it updates claims made on Entergys ER to the FSEIS, but states its opposition to the admission of any claims regarding emergency planning impacts on EJ populations.228 Moreover, because it represents that the data or conclusions in the FSEIS do not differ significantly from those in the DSEIS, Entergy contends that Clearwaters amendments regarding the no-action alternative and closed-cycle cooling are not timely filed.229 Entergy also maintains that additional scrutiny of the no-action alternatives impact on EJ populations is immaterial to the NRCs licensing decision in this proceeding given that the FSEIS already concludes that those impacts would be small to moderate.230 Similarly, Entergy urges the Board to view CW-EC-3A as having neither the requisite support indicating how or why [the FSEISs analysis of the no-action alternative]

should have been conducted differently nor showing why the air quality impacts from closed cycle cooling would fall disproportionately on minority or low-income populations.231 Lastly, Entergy maintains that the no-action and closed-cycle cooling alternatives do not raise genuine disputes with the FSEIS because the FSEIS has satisfactorily addressed the comments made on the DSEIS. Also, Entergy argues that Clearwater has not challenged the analysis and 227 See id. at 3-10, 20-22.

228 Entergy Answer to Amended CW-EC-3 at 9-10.

229 Id. at 11-13, 19-20.

230 Id. at 14-15.

231 Id. at 16-21.

conclusions reached in the FSEIS, has not explained why minority populations would disproportionately be affected by impacts compared to the general population, and has not demonstrated that the NRC Staff has failed to reach its conclusions independently.232 The NRC Staff agrees with Entergy regarding CW-EC-3A inasmuch as it updates Clearwaters challenges to the ER to the FSEIS and objects to Clearwater raising any concerns over emergency planning.233 However, the NRC Staff characterizes Clearwaters challenges to the FSEISs no-action alternative analysis as untimely, as failing to raise a material dispute with the FSEIS, as an incorrect reading of the FSEIS, and as too vague to be admissible.234 Further, the NRC Staff describes the closed-cycle cooling aspect of CW-EC-3A as unsupported, immaterial to the NRCs licensing decision, and based on an erroneous reading of the FSEIS.235 Clearwater replies that CW-EC-3A is timely filed because Section 2.309(f)(2) permits amended contentions to be filed based on the FSEIS, even if an intervenor has not challenged similar data or conclusions in the DSEIS, and that the information giving rise to the contention was presented for the first time in the FSEIS.236 In the alternative, Clearwater asserts that it has shown good cause, pursuant to Section 2.309(c)(1), to have filed this amended contention when it did, because it could not have anticipated that Entergy would encourage various organizations to submit comments on the DSEIS, and that the NRC Staff would inadequately respond to those comments.237 232 Id. at 16-18, 21-22.

233 NRC Staff Answer to CW-EC-3 at 8-9.

234 Id. at 9-18.

235 Id. at 19-21.

236 Amended CW-EC-3 Reply at 3-6, 9-10.

237 Id. at 6-9.

Further, Clearwater argues that CW-EC-3A raises a material issue in this proceeding because its criticisms of the FSEISs no-action and closed-cycle cooling alternative analyses show that the NRC Staff has failed to reach any conclusions of the impact of these alternatives on EJ populations.238 According to Clearwater, given that the FSEIS does not appropriately respond to those comments on this issue made in response to the DSEIS and provide the NRC Staffs own information to address them, Entergys manipulat[ion of] the comment process led the NRC Staff to insufficiently analyze the adverse impacts from the no-action and closed-cycle cooling alternative to the same EJ populations alleged to be represented by these commenters.239 Finally, Clearwater contends that CW-EC-3A does not challenge Entergys emergency planning. Instead, Clearwater states that it is attacking the NRC Staffs failure to analyze mitigation for the disparate impacts of the proposed action on EJ populations.240 These populations include not only the Sing Sing prisoners mentioned by the Board in LBP-08-13, but also other EJ populations within 50 miles of Indian Point241 in pre-schools, nursing homes, shelters, hospitals, and minority and low-income residents in the region who lack access to private transportation.242 B. Board Decision We admit those portions of CW-EC-3A that seek to update the contention as originally admitted. However, we reject the remainder of the amended contentions on timeliness and materiality grounds.

238 Id. at 10-12.

239 Id. at 12-16.

240 Id. at 18.

241 Clearwater references the recent events at the Fukushima Daiichi Nuclear Power Plant and the NRCs recommendation that populations within fifty miles of that facility be evacuated.

242 Id. at 18-19.

In order to directly challenge facts or conclusions stated in the FSEIS through timely filed new or amended contentions, Clearwater must identify significant differences between the data and conclusions in the DSEIS and the FSEIS.243 This policy is consistent with the Commissions longstanding and pervasive position that requires intervenors to challenge deficiencies at the earliest possible time.244 Having chosen not to challenge the DSEIS, Clearwater cannot now directly challenge aspects of the FSEIS that have not differed significantly from the DSEIS.245 If, however, a party made comments to the DSEIS that are not adequately addressed in the FSEIS, then the triggering event for a timely challenge would be the publication of the FSEIS. Nevertheless, in this Motion Clearwater did not identify actual deficiencies in the NRCs response to comments. Rather, it challenged the motives of commenters, an issue that is irrelevant. Regardless of the commenters motives, comments must be addressed by the NRC Staff and any challenge to the NRC Staffs response to a comment must point to errors in how the comment was resolved in the FSEIS. Clearwater, however, did not catalogue the DSEIS comments nor explain why the NRC Staffs responses to them were inadequate.246 243 10 C.F.R. § 2.309(f)(2).

244 Progress Energy Florida, Inc. (Combined License Application, Levy County Nuclear Power Plant, Units 1 and 2), CLI-10-02, 71 NRC __, __ (slip op. at 9) (Jan. 7, 2010) (citing Duke Power Co. (Catawba Nuclear Station, Units 1 and 2), CLI-83-19, 17 NRC 1041, 1050 (1983)).

245 10 C.F.R. § 2.309(f)(2).

246 See Amended CW-EC-3 at 4 (only alleging that Clearwater, Riverkeeper, and others pointed out that Section 8.2 of the DSEIS was flawed because it did not consider and analyze new information about various measures that could be taken if the no-action alternative were implemented as compared to the detrimental impact of relicensing the plant. FSEIS at A-153.

These omissions were addressed obliquely in the FSEIS, but the NRC failed to adequately address the issue. E.g. FSEIS at A-154.).

Part of the NRC Staffs responsibility in preparing its FSEIS is responding to comments made on the DSEIS.247 Contentions alleging that the NRC Staff has not fulfilled its obligation to take a hard look in its FSEIS at comments filed on the DSEIS can be within the scope of this proceeding pursuant to 10 C.F.R. § 2.309(f)(1)(iii). However, as we stated before, such a contention must also show why the alleged error or omission is of possible significance to the result of the proceeding, namely, some significant link between the claimed deficiency and either the health and safety of the public, or the environment.248 Clearwater asserts that the NRC Staff did not look hard enough at the potential health impacts of the no-action alternative as stated in comments on the DSEIS from groups purportedly affiliated with Entergy.249 However, the identity of those groups is irrelevant to whether the NRC Staff has given a hard look at their comments. We are not told why the comments were misleading or how the NRC Staffs analysis of them was deficient, beyond a challenge to the motives of the commenters and unsupported conclusions regarding the accuracy of the comments and the NRC Staffs assessment thereof.

The purpose of the no-action alternative is for the agency to review and allow the public to understand its review of both the positive and negative impacts that would result from remaining with the status quo rather than proceeding with the proposed action.250 If Clearwaters position in CW-EC-3A was that the actual no-action alternative is more preferable than the NRC Staffs description of the no-action alternative, such a position might lead to a dispute over whether the NRC Staff has incorrectly minimized the benefits or maximized the 247 10 C.F.R. § 51.91(a); Dominion Nuclear North Anna, LLC (Early Site Permit for North Anna ESP Site), CLI-07-27, 66 NRC 215, 224 (2007).

248 LBP-08-13, 68 NRC at 62.

249 Amended CW-EC-3 at 3-8.

250 See Kilroy v. Ruckelshaus, 738 F.2d 1448, 1453 (9th Cir. 1984) (citations omitted)

(explaining the objectives of analyzing the no-action alternative).

adverse impacts of the no-action alternative. Instead, Clearwater only asserted that the untrustworthiness of the commenters claiming to represent EJ populations could potentially impact the relicensing decision for IP2 and IP3. Moreover, Clearwater has not pointed to specific impacts potentially flowing to EJ populations in the no-action alternative that have not been addressed by the NRC Staff. Clearwater offers no critique of the NRCs analysis other than to note that it mirrors Entergys public relations slogan and suggests that the FSEIS should have treated them with great care.251 Accordingly, Clearwater has neither raised an issue that is material to the NRCs licensing decision in this proceeding pursuant to 10 C.F.R.

§ 2.309(f)(1)(iv) nor alleged any facts or provided expert opinions to controvert the analysis in the FSEIS. Therefore, this aspect of CW-EC-3A is inadmissible.

In addition, Clearwaters expressed concern over the closed-cycle cooling alternative is that the FSEISs analysis is both too indeterminate to be useful and entirely dependent on the assertions of Entergy.252 However, Clearwater has not provided any alleged facts or expert opinion challenging the FSEISs analysis of the closed-cycle cooling alternative. In its Motion, Clearwater states that it and others commented on the DSEIS, pointing out that the relicensing of IP2 and IP3 would have the potential for disparate impacts on potentially affected EJ populations253 But Clearwater merely reproduces concerns raised by an engineer, Bill Powers, regarding the Staffs review in the Oyster Creek license renewal proceeding, says that the NRC lacks independent judgment, and asserts (without support) that the NRC Staff did not look hard enough at the air quality impacts from pursuing replacement power costs and their possible 251 See Amended CW-EC-3 at 4, 6.

252 Id. at 9.

253 Id. at 3.

effect on EJ populations.254 These vague allegations do not meet the minimal pleading requirements for an admissible contention.255 In preparing its FSEIS, the NRC Staff may rely on information submitted by an applicant such as Entergy, as long as that information is independently verified by the NRC Staff.256 Beyond its bare assertions, Clearwater has not explained why it believes the NRC Staff has failed to conduct such an independent verification in its FSEIS. Therefore, the closed-cycle cooling aspect of CW-EC-3A is inadmissible pursuant to 10 C.F.R. § 2.309(f)(1)(v) and (vi).

In summary, Clearwaters Motion to Amend and Extend CW-EC-3 is granted in part and denied in part. CW-EC-3A is consolidated with CW-EC-3 as CW-EC-3A and is amended to read as follows:

Entergys environmental report and the Final Supplemental Environmental Impact Statement contain seriously flawed environmental justice analyses that do not adequately assess the impacts of relicensing Indian Point on the minority, low-income and disabled populations in the area surrounding Indian Point.257 IX. RK-EC-8 A. Parties Positions On February 3, 2011, Riverkeeper moved to admit Contention EC-8 (RK-EC-8),258 which contends that the FSEIS is inadequate because it does not include or consider the assessment 254 See id. at 8-10.

255 See 10 C.F.R. § 2.309(f)(1)(i).

256 See Sierra Club v. Van Antwerp, 719 F. Supp. 2d 58, 69 (D.D.C. 2010) (stating that the

[Army] Corps [of Engineers] may rely on information submitted by the applicant but must independently verify such information).

257 Amended CW-EC-3 at 15.

258 Riverkeeper Inc. Consolidated Motion for Leave to File a New Contention and New Contention Concerning NRC Staffs Final Supplemental Environmental Impact Statement (Feb.

3, 2011) [hereinafter RK-EC-8]. Entergy and the NRC Staff filed answers to RK-EC-8 on March 7, 2011. Applicants Answer to Riverkeeper, Inc.s Motion for Leave and New Contention Concerning the Consideration of Endangered and Threatened Aquatic Species (Mar. 7, 2011)

[hereinafter Entergy Answer to RK-EC-8]; NRC Staffs Answer to Riverkeeper, Inc.s Motion for Leave to File a New Contention, and New Contention EC-8 Concerning NRC Staffs Final

of the National Marine Fisheries Service (NMFS) regarding impacts to endangered species due to incomplete [Endangered Species Act] ESA § 7 consultation procedures.259 Riverkeeper argues that the NRC cannot grant Entergys LRA for IP2 and IP3 unless the NRC Staff issues a supplemental EIS that fully considers the outcome of the consultation process, including NMFS forthcoming biological opinion.260 Because the NRC Staff did not complete its consultation with NMFS regarding the shortnose sturgeon (an endangered species) and the Atlantic sturgeon (a candidate for listing as threatened or endangered) prior to issuing the FSEIS, Riverkeeper argues that the NRCs conclusions in the FSEIS were not fully informed by the requisite input from NMFS and thus lacked a hard look as required by NEPA.261 Riverkeeper also represents that RK-EC-8 is based on new information that differs significantly from information previously available because Riverkeeper had no way of knowing that the NRC Staff would issue its FSEIS without completing ESA consultation with NMFS.262 Entergy opposes admission of RK-EC-8, maintaining that RK-EC-8 was not timely filed to the extent it challenges the sufficiency of the NRC Staffs consultation with NMFS because Riverkeeper could have brought this challenge when that consultation began, or earlier in the consultation process before the FSEIS was issued.263 Even if Riverkeepers petition is deemed timely, Entergy argues that RK-EC-8 does not raise a genuine dispute on a material issue of law or fact because (1) there is no requirement for the NRC to complete its ESA § 7 consultation Supplemental Environmental Impact Statement (Mar. 7, 2011) [hereinafter NRC Staff Answer to RK-EC-8]. Riverkeeper replied on March 14, 2011. Riverkeeper Inc. Combined Reply to NRC Staff and Entergy Answers to Riverkeepers Motion for Leave to File a New Contention and New Contention Concerning NRC Staffs Final Supplemental Environmental Impact Statement (Mar.

14, 2011) [hereinafter RK-EC-8 Reply].

259 RK-EC-8 at 1.

260 Id.

261 See id. at 7 n.6, 12, 17-18.

262 See id. at 18-19.

263 Entergy Answer to RK-EC-8 at 13-14.

with NMFS prior to issuing the FSEIS, (2) the NRC Staff need not supplement the FSEIS once the ESA consultation process is complete, and (3) the NRC Staff has not violated any time restrictions in the preparation of its Biological Assessment (BA).264 The NRC Staff also opposes admission of RK-EC-8. First, the NRC Staff represents that it has complied with the ESA even though it issued the FSEIS before completion of consultation with NMFS because [i]ssuance of the FSEIS does not cause or amount to an irreversible or irretrievable commitment of resources, and the procedure of issuing the FSEIS before completion of ESA § 7 consultation has been followed by the NRC Staff in another license renewal proceeding.265 Thus, the NRC Staff, like Entergy, reasons that RK-EC-8 raises no genuine dispute because there is nothing in the ESA or NEPA expressly requiring the NRC Staff to complete its consultation with NMFS before issuance of the FSEIS.266 Further, the NRC Staff claims that RK-EC-8 is untimely because it challenges information in the NRC Staffs Revised BA and thus could have been raised when the NRC Staff issued its Original BA and DSEIS in December 2008.267 Likewise, the NRC Staff also considers RK-EC-8 untimely to the extent it challenges the NRC Staffs Revised BA, which was issued in December 2010 after the 264 Id. at 14-20.

265 NRC Staff Answer to RK-EC-8 at 11.

266 Id. at 12-15. Shortly after Riverkeepers Reply was filed, the NRC Staff filed a supplement to its Answer to RK-EC-8. This supplement announced that the expected completion date of formal consultations has been extended to May 15, 2011, and the expected issuance date of NMFS Biological Opinion has been extended to June 29, 2011, unless further extended.

Supplement to NRC Staffs Answer to Riverkeeper, Inc.s Motion for Leave to File a New Contention, and New Contention EC-8 Concerning NRC Staffs Final Supplemental Environmental Impact Statement (Mar. 16, 2011) at 2 [hereinafter Supplement to NRC Staff Answer to RK-EC-8]. As of the date of this decision, the Board has not been notified that the Biological Opinion has been issued.

267 Id. at 17-19.

FSEIS, because the Board only extended the normal thirty-day window to file new contentions arising under the FSEIS, not for new contentions arising under the Revised BA.268 Riverkeeper replies that the final NEPA document issued by the NRC Staff should have considered the results of the ESA § 7 consultation process.269 Likewise, Riverkeeper emphasizes that the precedent (both NRC Staff practice and federal caselaw), cited by Entergy and the NRC Staff to demonstrate the appropriateness of the NRC Staff issuing the FSEIS before completion of consultation, is inapposite given the facts of this proceeding.270 Similarly, Riverkeeper urges the Board not to view the partial consultation already conducted with NMFS and incorporated into the FSEIS as sufficient to satisfy NEPA and ESA because NMFS has not yet drawn conclusions regarding how renewal of the licenses of IP2 and IP3 will impact certain endangered species.271 Riverkeeper also stresses that federal caselaw interpreting NEPA mandates the issuance of a supplemental EIS for the types of information likely to emerge from NMFSs ultimate conclusions.272 Finally, Riverkeeper states that Entergy and the NRC Staff have mischaracterized the timeliness of RK-EC-8 because the contention challenges the comprehensiveness of all of the NRC Staffs NEPA review and how the FSEISs conclusions inadequately incorporate the views of NMFS.273 B. Legal Standards Governing the NRC Staff under the ESA and NEPA The NRCs final decision on a license application must consider the Final Environmental Impact Statement that is issued for a proposed action, along with any comments or 268 Id. at 19.

269 RK-EC-8 Reply at 4-5.

270 Id. at 5-6, 9-11.

271 Id. at 6-7.

272 Id. at 7-8 (citing Marsh v. Oregon Natural Res. Council, 490 U.S. 360, 372 (1989)).

273 Id. at 13-16.

supplements made to that document.274 NEPA mandates that the NRC Staff take a hard look at the environmental impacts of the proposed action, which is subject to a rule of reason.275 As part of its review of the environmental impacts of Entergys LRA for IP2 and IP3, the NRC Staff is obliged to evaluate the impact of refurbishment and other license-renewal-related construction activities on important plant and animal habitats as well as the impact of the proposed action on threatened or endangered species in accordance with the Endangered Species Act.276 Table B-1 of 10 C.F.R. Part 51 generally expects that nuclear power plant refurbishment or continued operation will not adversely affect endangered species.277 However, Table B-1 considers the impact to threatened or endangered species a Category 2 issue278 requiring a site-specific review, and thus it mandates that consultation with appropriate agencies would be needed at the time of license renewal to determine whether threatened or endangered species are present and whether they would be adversely affected.279 274 10 C.F.R. § 51.94.

275 Southern Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site), LBP-09-07, 69 NRC 613, 631 (2009) (referencing Louisiana Energy Services, L.P. (Claiborne Enrichment Center), CLI-98-3, 47 NRC 77, 87-88 (1998); Long Island Lighting Co. (Shoreham Nuclear Power Station), ALAB-156, 6 AEC 831, 836 (1973)).

276 10 C.F.R. § 51.53(c)(3)(ii)(E); see id. § 51.71(a) (the draft [environmental impact] statement will address [inter alia] . . . the matters specified in § . . . 51.53); id. § 51.90 (the NRC staff will prepare a final environmental impact statement in accordance with the requirements in

§ . . . 51.71 for a draft environmental impact statement).

277 10 C.F.R. Part 51, app. B, tbl. B-1.

278 As we have noted before, Category 1 issues have been resolved by the NRC in the Generic Environmental Impact Statement for License Renewal, and thus are not encompassed in the agencys review of a license renewal application and barred from litigation in adjudicatory proceedings. However, those issues classified as Category 2 issues necessitate site-specific review and are subject to litigation in adjudicatory proceedings. See LBP-08-13, 68 NRC at 67 (citing Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), CLI-01-17, 54 NRC 3, 11-12 (2001)).

279 10 C.F.R. Part 51, app. B, tbl. B-1.

The NMFS, which is part of the Department of Commerces National Oceanic and Atmospheric Administration, shares the administration of the consultation function of the ESA with the Fish and Wildlife Service (FWS) of the Department of the Interior.280 Generally, NMFS has jurisdiction over marine or anadromous species, while FWS has jurisdiction over freshwater and land-based animals.281 Section 7(a)(2) of the ESA directs that:

each Federal agency shall, in consultation with and with the assistance of

[NMFS], insure that any action authorized, funded, or carried out by such agency (hereinafter in this section referred to as an agency action) is not likely to jeopardize the continued existence of any endangered species or threatened species or result in the destruction or adverse modification of habitat of such species . . . .282 Before engaging in formal consultation with NMFS under ESA § 7(a)(2), an agency may (but does not have to) informally consult with NMFS to aid the agency in deciding whether formal consultation is required. If informal consultation results in the agency deciding, with written concurrence of NMFS, that the action is not likely to adversely affect listed species or critical habitat, the consultation process is terminated, and no further action is necessary.283 On the other hand, once consultation has commenced, the federal agency and the license applicant are prohibited from mak[ing] any irreversible or irretrievable commitment of resources with respect to the agency action which has the effect of foreclosing the formulation or implementation of any reasonable and prudent alternative measures which would not violate 280 See Natl Assn of Home Builders v. Defenders of Wildlife, 551 U.S. 644, 651 (2007); 50 C.F.R. § 402.01(b); see also Endangered Species Act of 1973 § 3, 16 U.S.C. § 1532(15).

281 See Gifford Pinchot Task Force v. U.S. Fish & Wildlife Serv., 378 F.3d 1059, 1063 n.1 (9th Cir. 2004).

282 16 U.S.C. § 1536(a)(2); see 50 C.F.R. § 402.01.

283 50 C.F.R. § 402.13(a).

ESA § 7(a)(2).284 To comply with ESA § 7, each federal agency shall . . . request of [NMFS]

information whether any species which is listed or proposed to be listed may be present in the area of such proposed action.285 If NMFS advises in the affirmative that there may be species that are listed or proposed to be listed in the area of the proposed action, then the agency must conduct a biological assessment [BA] for the purpose of identifying any endangered species or threatened species which is likely to be affected by such action.286 The ESA permits the BA to be undertaken as part of a Federal agencys compliance with section 102 of [NEPA].287 If the BA concludes that the proposed action will affect a listed species, then formal consultation with NMFS is necessary.288 After consultation has concluded, NMFS must present to the agency and the applicant its written Biological Opinion (BiOp), which contains a summary of the information on which the opinion is based, detailing how the agency action affects the species or its critical habitat. If jeopardy or adverse modification is found, [NMFS] shall suggest those reasonable and prudent alternatives which [it] believes would not violate [ESA § 7(a)(2)] and can be taken by the Federal agency or applicant in implementing the agency action.289 284 16 U.S.C. § 1536(d); 50 C.F.R. § 402.09; see also Bays Legal Fund v. Browner, 828 F. Supp. 102, 112 (D. Mass. 1993) (holding that the ESA calls for some judicial discretion to determine whether an agencys decision to proceed with action, prior to the completion of formal consultation with the NMFS, could have the effect of foreclosing alternatives and could, therefore, be considered arbitrary and capricious.).

285 16 U.S.C. § 1536(c)(1); 50 C.F.R. § 402.06(a).

286 16 U.S.C. § 1536(c)(1).

287 Id.; 50 C.F.R. § 402.06(a).

288 50 C.F.R. § 402.14(a). However, formal consultation may be excused if the agency, with the concurrence of NMFS, finds that the proposed action will not likely affect the listed species. Id.

§ 402.14(b)(1).

289 16 U.S.C. § 1536(b)(3)(A).

C. Chronological Background of the NRC Staffs ESA Review in this Proceeding The NRC Staff sent a letter to NMFS in August 2007, inquiring whether there were any endangered or threatened species in proximity to IP2 and IP3 that could be affected by the reactors relicensing. In October 2007, NMFS responded that it surmised the shortnose sturgeon, an endangered species, and the Atlantic sturgeon, a candidate for threatened or endangered status, were indeed in the vicinity of the reactors and could be affected by their relicensing.290 The NRC Staffs DSEIS, issued in December 2008, concluded that both species of sturgeon could be adversely affected by the relicensing of IP2 and IP3 and that such impacts could be small to large, but stated that it needed more information before it would be able to define the extent of such impacts.291 The NRC Staff also included with its DSEIS a specific BA for the shortnose sturgeon due to its status as a listed endangered species.292 Because of these expected impacts, the NRC Staff endeavored to initiate formal consultation with NMFS later that month, but in February 2009 that effort was delayed by NMFS, which sought more information about impacts to the shortnose sturgeon from the NRC Staff before agreeing to commence formal consultation.293 On December 3, 2010, the NRC Staff issued its FSEIS,294 which ostensibly analyzed the impacts to both shortnose and Atlantic 290 See FSEIS at 4-57.

291 See Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 38, Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Draft Report for Comment, NUREG-1437 (Dec. 2008) at 4-51 to 4-52 [hereinafter DSEIS].

292 See id., app. E, Biological Assessment of the Potential Effects on Federally Listed Endangered or Threatened Species from the Proposed Renewal of Indian Point Nuclear Generating Plant, Unit Nos. 2 and 3 at E-88 to E-100.

293 See FSEIS, app. E, Letter from Mary A. Colligan, Assistant Regional Administrator for Protected Resources, United States Department of Commerce, National Oceanic and Atmospheric Administration, National Marine Fisheries Service, Northeast Region, to David J.

Wrona, Branch Chief, U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Program, Division of License Renewal, Projects Branch 2 (Feb. 24, 2009) at E-93 to E-95.

294 See Letter from Sherwin E. Turk, Counsel for NRC Staff, to Atomic Safety and Licensing Board (Dec. 3, 2010).

sturgeon and concluded they would be small.295 On December 10, 2010, the NRC Staff submitted its Revised BA for the shortnose sturgeon to NMFS to fulfill NMFSs request for information.296 As mentioned supra, NMFS has notified the NRC Staff that it expects to complete the consultation process by mid-May 2011, and issue its BiOp by the end of June 2011.297 As of the date of this decision, the Board has not been notified that the BiOp has been issued.

D. Board Decision RK-EC-8 alleges that the NRC Staff has failed to complete its formal consultation process with NMFS before issuing its final statement of the environmental impacts of the proposed action, the FSEIS, and that, without the input from NMFS, the NRC Staff was unable to take a hard look at those impacts as required by NEPA.298 We disagree with the position that this contention is not timely. First, the NRC says that RK-EC-8 was filed too late because it could have challenged statements made in the NRC Staffs original BA issued in December 2008.299 However, Riverkeeper had no way of knowing that the NRC Staff would not complete the ESA consultation process before issuing its FSEIS.

Given that this fact animates Riverkeepers challenge to the sufficiency of the NRC Staffs hard look in the FSEIS, we find that it differs significantly from the previously available NEPA documents and thus satisfies 10 C.F.R. § 2.309(f)(2). Second, while much of the NRC Staffs Answer to RK-EC-8 acknowledges Riverkeepers challenge to the sufficiency of its FSEIS, NRC 295 See FSEIS at 4-57 to 4-60.

296 See Letter from David J. Wrona, Chief, U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, Division of License Renewal, Projects Branch 2, to Mary A.

Colligan, Assistant Regional Administrator for Protected Resources, U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Marine Fisheries Service, Northeast Region (Dec. 10, 2010) (ADAMS Accession No. ML102990043).

297 See supra note 266, Supplement to NRC Staff Answer to RK-EC-8 at 2.

298 RK-EC-8 at 17-18.

299 See NRC Staff Answer to RK-EC-8 at 18-19.

Staff makes the crabbed argument that RK-EC-8 is late-filed because its concurrent basis in the ESA is not the subject of the Boards December 27, 2010 Order extending the time to file new contentions arising only out of the FSEIS.300 Riverkeepers legal dispute is that the FSEIS did not take a hard look at the environmental impacts to endangered species by not including the BiOp from NMFS, and Riverkeepers sought remedy for that deficiency is a supplementation of that FSEIS.301 We find that RK-EC-8, a challenge to the FSEIS, was timely filed pursuant to 10 C.F.R. § 2.309(f)(2).

NEPA requires that a federal agency in reaching its decision will have available, and will carefully consider, detailed information concerning significant environmental impacts.302 While the NRC Staff might have incorporated information from NMFS into the preparation of its FSEIS,303 those comments do not necessarily reflect the NMFSs final conclusions that will be in its BiOp and only when that document is issued will the NRC Staff have NMFSs complete views to consider in formulating its own recommendations regarding Entergys LRA.304 It is this Boards view that completion of that consultation process is necessary to the NRC Staffs fulfillment of its obligations under the ESA and NEPA. NMFSs BiOp will aid the agency in making its licensing decision in this proceeding. Without receipt and consideration of 300 See id. at 19.

301 RK-EC-8 at 1, 17-18.

302 Robinson v. Methow Valley Citizens Council, 490 U.S. 332, 349 (1989).

303 FSEIS at 4-57.

304 See Tennessee Valley Auth. (Hartsville Nuclear Plant, Units 1A, 2A, 1B, and 2B), ALAB-463, 7 NRC 341, 363-64 (1978) (citing Natl Wildlife Fedn v. Coleman, 529 F.2d 359, 371 (5th Cir.), cert. denied, 429 U.S. 979 (1976) (explaining that although the Commission is ultimately responsible for deciding both whether a proposed agency action does jeopardize endangered species and whether to proceed with the proposed action, a licensing board may not assume that NMFSs BiOp will necessarily come to the same conclusion as the NRC Staff before consultation with NMFS is complete).

that input from NMFS, the NRC Staff arguably has not taken the requisite hard look at this issue.

The FSEIS itself does not beget the final license issuance in this proceeding and therefore its mere issuance without completion of consultation does not necessarily run afoul of the ESAs prohibition on the agencys mak[ing] any irreversible or irretrievable commitment of resources with respect to the agency action which has the effect of foreclosing the formulation or implementation of any reasonable and prudent alternative measures to avoid the likely jeopardizing of the continued existence of any endangered or threatened species or its habitat.305 Nonetheless, the FSEISs essential final analysis and a final recommendation on the action to be taken306 must play a fundamental role in the agencys decision in this proceeding on Entergys LRA.307 Specifically, Riverkeeper has raised a question of whether the existing FSEIS fulfills the NRCs hard look obligations under NEPA. Moreover, while the remedy Riverkeeper requests is the supplementation of the FSEIS,308 a resolution of the question whether a supplemental FSEIS is necessary is a matter for adjudication. Therefore, Riverkeepers allegation that the NRC Staffs failure to take into account NMFSs BiOp violates the agencys duty to conduct a hard look at the environmental impacts of the proposed action raises a genuine dispute of law pursuant to 10 C.F.R. § 2.309(f)(1)(vi).

Riverkeeper has alleged sufficient facts under 10 C.F.R. § 2.309(f)(1)(v), and provided an adequate factual basis under 10 C.F.R. § 2.309(f)(1)(ii), to support this contention: namely, 305 See 16 U.S.C. § 1536(d).

306 10 C.F.R. § 51.91(d).

307 See id. § 51.94.

308 See RK-EC-8 at 1.

the contents of the FSEIS and the NRC Staffs BA.309 What is more, because the NRC Staffs environmental review of Entergys LRA for IP2 and IP3 must include a site-specific review of endangered or threatened species affected by Entergys LRA as well as consultation with NMFS,310 that review is within the scope of this license renewal proceeding pursuant to 10 C.F.R. § 2.309(f)(1)(iii). Likewise, whether the NRC Staff has taken a hard look at the environmental impacts of the proposed action under the agencys NEPA-implementing regulations is material to the NRCs licensing decision in this proceeding pursuant to 10 C.F.R.

§ 2.309(f)(1)(iv). Therefore, we find RK-EC-8 admissible under 10 C.F.R. § 2.309(f)(1).311 X. CONCLUSION For the foregoing reasons, we:

A. Grant New Yorks Motion to admit NYS-12C and consolidate it with NYS-12/12A/12B hereinafter as Consolidated NYS-12C; B. Grant New Yorks Motion to admit NYS-17B as limited and consolidate it with NYS-17/17A hereinafter as Consolidated NYS-17B; de facto deny New Yorks Petition for Waiver and Exemption Request from 10 C.F.R. § 51.23 finding it unnecessary to rule thereon; C. Grant New Yorks Motion to add additional bases to NYS-25; D. Grant New Yorks Motion to Admit NYS-37 as limited by this Memorandum and Order and consolidate it with NYS-9/33 hereinafter as Consolidated NYS-37; 309 See RK-EC-8 at 16-17; see also Entergy Answer to RK-EC-8 at 3-6; NRC Staff Answer to RK-EC-8 at 9-10.

310 See 10 C.F.R. Part 51, app. B, tbl. B-1.

311 Entergy is correct, however, that its Application to renew the licenses of reactors already built does not qualify as a major construction activity necessitating the NRC Staffs preparation of a BA and the time constraints imposed by the ESA for preparation of a BA. See 16 U.S.C.

§ 1536(c)(1); 50 C.F.R. § 402.12(b)(1); Entergy Answer to RK-EC-8 at 19-20. Thus, to the extent RK-EC-8 challenges the pace the NRC Staff has taken to prepare its BA, that challenge is not material to the NRC Staffs licensing decision in this proceeding pursuant to 10 C.F.R.

§ 2.309(f)(1)(iv).

E. Grant Riverkeepers and Clearwaters request to apply RK-EC-3/CW-EC-1 to the FSEIS; F. Deny Riverkeepers and Clearwaters Motion to Admit Contentions CW-EC-8/RK-EC-6, CW-SC-2/RK-TC-3, CW-EC-9/RK-EC-7, and CW-SC-3/RK-TC-4; Deny Riverkeepers and Clearwaters Petition for Waiver of 10 C.F.R. § 51.23; and Deny Entergys Motion to Strike Portions of Clearwaters and Riverkeepers Reply Regarding CW-EC-8/RK-EC-6, CW-SC-2/RK-TC-3, CW-EC-9/RK-EC-7, and CW-SC-3/RK-TC-4; G. Grant Clearwaters Motion to Amend CW-EC-3 as limited to those proposed amendments that update the contention as originally admitted hereinafter as CW-EC-3A; and H. Grant Riverkeepers Motion to Admit RK-EC-8.

This Memorandum and Order is subject to interlocutory review in accordance with the provisions of 10 C.F.R. § 2.341(f)(2). A petition for review that meets the requirements of section 2.341(f)(2) must be filed within fifteen (15) days of service of this Memorandum and Order.312 It is so ORDERED.

THE ATOMIC SAFETY AND LICENSING BOARD313

/RA/

Lawrence G. McDade, Chairman ADMINISTRATIVE JUDGE

/RA/

Dr. Kaye D. Lathrop ADMINISTRATIVE JUDGE

/RA/

Dr. Richard E. Wardwell ADMINISTRATIVE JUDGE Rockville, Maryland July 6, 2011 312 See 10 C.F.R. § 2.341(b)(1).

313 Copies of this Memorandum and Order were sent this date by Internet e-mail to: (1) Counsel for the NRC Staff; (2) Counsel for Entergy; (3) Counsel for the State of New York; (4) Counsel for Riverkeeper, Inc.; (5) Manna Jo Green, the Representative for Clearwater; (6) Counsel for the State of Connecticut; (7) Counsel for Westchester County; (8) Counsel for the Town of Cortlandt; (9) Mayor Sean Murray, the Representative for the Village of Buchanan; and (10) Michael J. Delaney, counsel for the City of New York.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247-LR

) 50-286-LR

)

(Indian Point Nuclear Generating Station, )

Units 2 and 3) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing LB MEMORANDUM AND ORDER (RULING ON PENDING MOTIONS FOR LEAVE TO FILE NEW AND AMENDED CONTENTIONS) has been served upon the following persons by U.S. mail, first class, or through NRC internal distribution.

Office of Commission Appellate U.S. Nuclear Regulatory Commission Adjudication Office of the Secretary of the Commission Mail Stop O-7H4M Mail Stop O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission. U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Office of the General Counsel Mail Stop T-3F23 Mail Stop O-15D21 Washington, DC 20555-0001 Washington, DC 20555-0001 Sherwin E. Turk, Esq.

Administrative Judge Beth N. Mizuno, Esq.

Lawrence G. McDade, Chair David E. Roth, Esq.

Brian Harris, Esq.

Administrative Judge Andrea Z. Jones, Esq.

Richard E. Wardwell Karl Farrar, Esq.

Brian Newell, Paralegal Administrative Judge Kaye D. Lathrop 190 Cedar Lane E.

Ridgway, CO 81432 Joshua A. Kirstein, Law Clerk

Docket Nos. 50-247-LR and 50-286-LR LB MEMORANDUM AND ORDER (RULING ON PENDING MOTIONS FOR LEAVE TO FILE NEW AND AMENDED CONTENTIONS)

William C. Dennis, Esq. Andrew M. Cuomo, Attorney General Assistant General Counsel John J. Sipos, Assistant Attorney General Entergy Nuclear Operations, Inc. Janice A. Dean 440 Hamilton Avenue Assistant Attorney General White Plains, NY 10601 Office of the Attorney General of the State of New York The Capitol State Street Albany, New York 12224 Kathryn M. Sutton, Esq. Joan Leary Matthews, Esq.

Paul M. Bessette, Esq. Senior Attorney for Special Projects Martin J. ONeill, Esq. New York State Department Counsel for Entergy Nuclear Operation, Inc. of Environmental Conservation Morgan, Lewis & Bockius, LLP 625 Broadway, 14th Floor 1111 Pennsylvania Avenue, NW Albany, New York 12233-5500 Washington, DC 20004 Michael J. Delaney, Esq. Robert D. Snook, Esq.

Director, Energy Regulatory Affairs Office of The Attorney General NYC Department of Environmental Protection State of Connecticut 59-17 Junction Boulevard 55 Elm Street Flushing, NY 11373 P.O. Box 120 Hartford, CT 06141-0120 Arthur J. Kremer, Chairman Stephen C. Filler, Board Member New York Affordable Reliable Electricity Hudson River Sloop Clearwater, Inc.

Alliance (AREA) 724 Wolcott Ave.

347 Fifth Avenue, Suite 508 Beacon, NY 12508 New York, NY 10016 2

Docket Nos. 50-247-LR and 50-286-LR LB MEMORANDUM AND ORDER (RULING ON PENDING MOTIONS FOR LEAVE TO FILE NEW AND AMENDED CONTENTIONS)

Sean Murray, Mayor Manna Jo Greene, Environmental Director Kevin Hay, Village Administrator Hudson River Sloop Clearwater, Inc.

Village of Buchanan 724 Wolcott Ave.

Municipal Building Beacon, New York 12508 236 Tate Avenue Buchanan, NY 10511-1298 Ross Gould, Board Member Hudson River Sloop Clearwater, Inc.

270 Route 308 Rhinebeck, NY 12572 Counsel for the Town of Cortlandt Nancy Burton, Esq.

Thomas F. Wood, Esq. Connecticut Residents Opposed Daniel Riesel, Esq. to Relicensing of Indian Point (CRORIP)

Jessica Steinberg, J.D. 147 Cross Highway Sive, Paget & Riesel, P.C. Redding Ridge, CT 06876 460 Park Avenue New York, NY 10022 Elise N. Zoli, Esq. Melissa-Jean Rotini, of counsel Goodwin Proctor, LLP Assistant County Attorney Exchange Place Office of Robert F. Meehan, 53 State Street Westchester County Attorney Boston, MA 02109 148 Martine Avenue, 6th Floor White Plains, NY 10601 FUSE USA Westchester Citizens Awareness Network John LeKay (WestCan), Citizens Awareness Network, Heather Ellsworth Burns-DeMelo (CAN), et al Remy Chevalier Susan H. Shapiro, Esq.

Bill Thomas 21 Pearlman Drive Belinda J. Jaques Spring Valley, NY 10977 351 Dyckman Street Peekskill, New York 10566 3

Docket Nos. 50-247-LR and 50-286-LR LB MEMORANDUM AND ORDER (RULING ON PENDING MOTIONS FOR LEAVE TO FILE NEW AND AMENDED CONTENTIONS)

Philip Musegaas, Esq. Richard L. Brodsky, Esq.

Deborah Brancato, Esq. Member of Assembly Riverkeeper, Inc. 92nd Assembly District, 20 Secor Road State of New York Ossining, NY 10562 5 West Main Street Suite 205 Elmsford, NY 10523 Sarah L. Wagner, Esq.

Legislative Office Building, Room 422 Albany, NY 12248

[Original signed by Christine M. Pierpoint]

Office of the Secretary of the Commission Dated at Rockville, Maryland this 6th day of July 2011 4