ML15110A397: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(10 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML15110A397 | | number = ML15110A397 | ||
| issue date = 02/18/2015 | | issue date = 02/18/2015 | ||
| title = | | title = Final Operating Exam (Sections a, B, and C) (Folder 3) | ||
| author name = Fish T | | author name = Fish T | ||
| author affiliation = NRC/RGN-I/DRS/OB | | author affiliation = NRC/RGN-I/DRS/OB | ||
| addressee name = Isham P | | addressee name = Isham P | ||
Line 14: | Line 14: | ||
| document type = License-Operator, Part 55 Examination Related Material | | document type = License-Operator, Part 55 Examination Related Material | ||
| page count = 270 | | page count = 270 | ||
| project = TAC:U01905 | |||
| stage = Other | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:Exelon Generation Training Id: 2015 NRC RO Admin C001 Revision: | {{#Wiki_filter:Exelon Generation Training Id: 2015 NRC RO Admin C001 Revision: 0.0 | ||
0.0 Title: Nl-ST-DO DAILY CHECKS (Partial) | |||
==Title:== | |||
Nl-ST-DO DAILY CHECKS (Partial) | |||
Approvals: | Approvals: | ||
Developed By P ,.?/J/ Paul Isham 5/28/14 Validated By Leigh Mason, Dave Ballard 08/21/2014 Facility Reviewer Greg Elkins Approximate Duration: | Developed By P ,.?/J/~ Paul Isham 5/28/14 Validated By Leigh Mason, Dave Ballard 08/21/2014 Facility Reviewer Greg Elkins Approximate Duration: 20 minutes Documentation of Performance: | ||
20 minutes Documentation of Performance: | |||
Performer: | Performer: | ||
Evaluator: | Evaluator: | ||
Start Time: Stop Time: Completion Time | Start Time: ---- | ||
Evaluators Signature: | Stop Time: Completion Time Grade: Pass I Fail Comments: | ||
Evaluators Signature: _ _ _ _ _ _ _ _ __ Date: | |||
_ Date: NRC JPM RO COOl Page 1of9 March 2015 | NRC JPM RO COOl Page 1of9 March 2015 | ||
Generation Instructor Information A. JPM Information | Exelon Generation References | ||
: 1. Description | : 1. Nl-ST-DO, Daily Checks | ||
: a. This JPM tests the operator's ability to record and interpret plant surveillance data and identify inoperable equipment. | : 2. NUREG 1123, 2.1.7 (4.4) | ||
Control room RPV water level readings are taken for Nl-ST-DO. | NRC JPM RO COOl Page 2 of 9 March 2015 | ||
Out of spec readings and inoperable equipment are identified by the operator. | |||
: 2. Task Information: | =~Exelon Generation Instructor Information A. JPM Information | ||
: a. NS-REL-01001, Perform System Surveillances. | : 1. Description | ||
: b. K/A 2.1.7 (4.4), Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation. | : a. This JPM tests the operator's ability to record and interpret plant surveillance data and identify inoperable equipment. Control room RPV water level readings are taken for Nl-ST-DO. Out of spec readings and inoperable equipment are identified by the operator. | ||
: 3. Evaluation | : 2. Task Information: | ||
/Task Criteria Perform Classroom No No Yes 4. Recommended Start Location | : a. NS-REL-01001, Perform System Surveillances. | ||
: a. Simulator | : b. K/A 2.1.7 (4.4), Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation. | ||
: 1) Simulator will be in 'Freeze'. | : 3. Evaluation /Task Criteria Perform Classroom No No Yes | ||
Therefore this cannot be performed in conjunction with a simulator JPM. NRC JPM RO COOl Page 3 of 9 March 2015 Exelon Generation | : 4. Recommended Start Location | ||
: 5. JPM Setup (if required) | : a. Simulator | ||
: a. Provide copies of Nl-ST-DO. | : 1) Simulator will be in 'Freeze'. Therefore this cannot be performed in conjunction with a simulator JPM. | ||
: b. Initialize simulator to IC-166 c. Plant is operating | NRC JPM RO COOl Page 3 of 9 March 2015 | ||
"'15% power d. Verify the following overrides are set: 1) 5M80A03550 | |||
= 73.00 2) 5M81A03560 | Exelon Generation | ||
= 75.00 3) 5M118A03860 | : 5. JPM Setup (if required) | ||
= 76.00 4) 5M116A03840 | : a. Provide copies of Nl-ST-DO. | ||
= 68.00 5) 5AR1TS1A031000 | : b. Initialize simulator to IC-166 | ||
= 68.00 6) 13M1A042680 | : c. Plant is operating "'15% power | ||
= 69.00 7) 9M53A051270 | : d. Verify the following overrides are set: | ||
= 70.50 e. Take the simulator to Run, and then back to Freeze f. Verify average Drywell temperature is less than 130°F g. Verify total Recirc flow is 38 Mlbm/hr h. Verify FWLC is selected to column 11 i. Turn off PI monitor NRC JPM RO COOl Page 4 of 9 March 2015 Exelon Generation B. Read Before Every JPM Performance | : 1) 5M80A03550 = 73.00 | ||
: 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. | : 2) 5M81A03560 = 75.00 | ||
During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | : 3) 5M118A03860 = 76.00 | ||
: 4) 5M116A03840 = 68.00 | |||
: 5) 5AR1TS1A031000 = 68.00 | |||
: 6) 13M1A042680 = 69.00 | |||
: 7) 9M53A051270 = 70.50 | |||
: e. Take the simulator to Run, and then back to Freeze | |||
: f. Verify average Drywell temperature is less than 130°F | |||
: g. Verify total Recirc flow is 38 Mlbm/hr | |||
: h. Verify FWLC is selected to column 11 | |||
: i. Turn off PI monitor NRC JPM RO COOl Page 4 of 9 March 2015 | |||
Exelon Generation B. Read Before Every JPM Performance | |||
: 1. For the performance of this JPM, I will act as all those you need to talk to. | |||
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | |||
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | ||
Repositioning of devices will be simulated by discussion and acknowledged by my cues. c. Read Before Each Evaluated JPM 1. This evaluated JPM is a measure of your ability to perform this task independently. | Repositioning of devices will be simulated by discussion and acknowledged by my cues. | ||
The CRS has determined that a verifier is not available and that additional verification will not be provided. | : c. Read Before Each Evaluated JPM | ||
NRC JPM RO COOl Page 5 of 9 March 2015 | : 1. This evaluated JPM is a measure of your ability to perform this task independently. The CRS has determined that a verifier is not available and that additional verification will not be provided. | ||
NRC JPM RO COOl Page 5 of 9 March 2015 | |||
Exelon Generation Given: | |||
* The plant is operating at approximately 15% power. | * The plant is operating at approximately 15% power. | ||
* Nl-ST-DO, Daily Checks, is in progress. | * Nl-ST-DO, Daily Checks, is in progress. | ||
* The provided printout shall be used to determine computer point and PI data. | * The provided printout shall be used to determine computer point and PI data. | ||
* The process computer is unavailable Evaluator: | * The process computer is unavailable Evaluator: Ask trainee if he/she has any questions after presenting initial conditions | ||
Ask trainee if he/she has any questions after presenting initial conditions | {Operators Name), obtain the instrument readings needed from control room panels to complete Nl-ST-DO Attachment 4 sections 5.0 and 6.0 only, then complete section 8.4 in the body of the procedure. When completed, report findings and provide completed sections to SRO. | ||
{Operators Name), obtain the instrument readings needed from control room panels to complete Nl-ST-DO Attachment 4 sections 5.0 and 6.0 only, then complete section 8.4 in the body of the procedure. | : 1. Provide repeat back of initiating cue SAT/ UNSAT p | ||
When completed, report findings and provide completed sections to SRO. Provide repeat back of initiating cue SAT/ UNSAT Cue: Acknowledge repeat back providing | Cue: Acknowledge repeat back providing STD: Proper communications correction if necessary. used. | ||
: 2. Obtain a copy of the reference procedure and SAT/ UNSAT review / utilize the correct section of the STD: Nl-ST-DO Obtained, procedure. | |||
STD: Nl-ST-DO | sections 5.0 and 6.0 p referenced. | ||
Note: Completed Nl-ST-DO is attached as JPM key. Small differences in recorded values may occur due to instrument interpolation. | |||
JPM key. Small differences in recorded values may occur due to instrument interpolation. | : 3. Records section 5.0 readings SAT/ UNSAT p STD: Records Reactor Recirc Pump Inlet Temperature readings on Attachment 4 Section 5.0 NRC JPM RO C001 Page 6 of 9 March 2015 | ||
Records section 5.0 readings SAT/ UNSAT p STD: Records Reactor Recirc Pump Inlet Temperature readings on Attachment 4 Section 5.0 NRC JPM RO C001 Page 6 of 9 March 2015 | : 4. Compare Recirc Pump Inlet Temperature SAT/ UNSAT readings and determines readings within p STD: Compares readings and 15°F determines readings within l5°F of each other PASS I FAIL p STD: Checks YES block in Section 5.0, indicating the maximum difference in loop temperatures is < l5°F | ||
: 4. Compare Recirc Pump Inlet Temperature SAT/ UNSAT readings and determines readings within | : 5. Record section 6.0 readings SAT/ UNSAT p STD: Records RPV water level Cue: Another operator has completed the readings on Attachment 4 required Independent Verifications. section 6.0 | ||
: 6. Record Total Recirc Flow SAT I UNSAT p STD: Records total recirc flow in the correct box on Attachment 4 section 6.0 | |||
: 8. Analyzes Yarway level indicator deviation PASS/ FAIL Note: This may be evidenced by the lack of | : 7. Determines average Drywell temperature SAT I UNSAT /NA p STD: Observes average Drywell Note: Since Yarway level indicator deviation temperature is less than 125°F is less than 4 inches, Drywell temperature reading is not necessary for task completion. | ||
: 8. Analyzes Yarway level indicator deviation PASS/ FAIL p STD: Determines Yarway level Note: This may be evidenced by the lack of indicator deviation is less than a report to the contrary. | |||
: 10. | the 6 inch limit | ||
NRC JPM RO COOl Page 8 of 9 March 2015 | : 9. Analyzes GEMAC level indicator deviation PASS/ FAIL p STD: Determines GEMAC level indicator deviation is greater than the 6 inch limit NRC JPM RO COOl Page 7 of 9 March 2015 | ||
=::""Exelon Generation | |||
Exelon Generation | |||
: 10. Determines GEMAC level indicators are PASS/ FAIL inoperable p STD: Checks INOP option in step 8.4 | |||
: 11. Provides completed sections to SRO and SAT/ UNSAT p STD: Proper communications informs of out of spec readings used. | |||
Control room readings are taken. Out of spec readings are identified to SRO and inoperable equipment is identified by the candidate. | |||
NRC JPM RO COOl Page 8 of 9 March 2015 | |||
=::""Exelon Generation JPM Handout Given: | |||
* The plant is operating at approximately 15% power. | * The plant is operating at approximately 15% power. | ||
* Nl-ST-DO, Daily Checks, is in progress. | * Nl-ST-DO, Daily Checks, is in progress. | ||
* The provided printout shall be used to determine computer point and PI data. | * The provided printout shall be used to determine computer point and PI data. | ||
* The process computer is unavailable (Operators Name), obtain the instrument readings needed from control room panels to complete Nl-ST-DO Attachment 4 sections 5.0 and 6.0 only, then complete section 8.4 in the body of the procedure. | * The process computer is unavailable (Operators Name), obtain the instrument readings needed from control room panels to complete Nl-ST-DO Attachment 4 sections 5.0 and 6.0 only, then complete section 8.4 in the body of the procedure. When completed, report findings and provide completed sections to SRO. | ||
When completed, report findings and provide completed sections to SRO. Page 9 of 9 March 2015 | NRC JPM RO C001 Page 9 of 9 March 2015 | ||
Generation Training Id: 2015 NRC RO Admin JPM EP Revision: | =~Exelon Generation Training Id: 2015 NRC RO Admin JPM EP Revision: 0.0 | ||
0.0 Title: Perform CRO Firefighting Checklist Approvals: | |||
Developed By Paul Isham 5/28/14 Validated By Leigh Mason 8/21/14 Facility Reviewer Greg Elkins Approximate Duration: | ==Title:== | ||
15 minutes Documentation of Performance: | Perform CRO Firefighting Checklist Approvals: | ||
Developed By Paul Isham 5/28/14 Validated By Leigh Mason 8/21/14 Facility Reviewer Greg Elkins Approximate Duration: 15 minutes Documentation of Performance: | |||
Performer: | Performer: | ||
Evaluator: | Evaluator: | ||
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | ||
Evaluators Signature: | Evaluators Signature: Date: | ||
Date: NRC JPM RO EP Page 1 of 8 March 2015 Exelon Generation References | NRC JPM RO EP Page 1 of 8 March 2015 | ||
: 1. EPIP-EPP-28, Firefighting | |||
: 2. NU REG 1123, 2.4.27 (3.4) NRC JPM RO EP Page 2 of 8 March 2015 Exelon Generation Instructor Information A. JPM Information | Exelon Generation References | ||
: 1. Description | : 1. EPIP-EPP-28, Firefighting | ||
: a. This JPM tests the operator's ability to carry out control room actions for a fire in the plant. The operator will execute the CRO Firefighting Checklist. | : 2. NU REG 1123, 2.4.27 (3.4) | ||
: 2. Task Information: | NRC JPM RO EP Page 2 of 8 March 2015 | ||
: a. Nl-286000-01023, Respond to a Plant Fire b. K/ A 2.4.27 (3.4 ), Knowledge of "fire in the plant" procedures | |||
: 3. Evaluation/ | Exelon Generation Instructor Information A. JPM Information | ||
Task Criteria Perform Classroom No No Yes 4. Recommended Start Location | : 1. Description | ||
: a. Simulator | : a. This JPM tests the operator's ability to carry out control room actions for a fire in the plant. The operator will execute the CRO Firefighting Checklist. | ||
: 5. JPM Setup (if required) | : 2. Task Information: | ||
: a. None NRC JPM RO EP Page 3 of 8 March 2015 | : a. Nl-286000-01023, Respond to a Plant Fire | ||
&=r-Exelon Generation B. Read Before Every JPM Performance | : b. K/ A 2.4.27 (3.4 ), Knowledge of "fire in the plant" procedures | ||
: 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. | : 3. Evaluation/ Task Criteria Perform Classroom No No Yes | ||
During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | : 4. Recommended Start Location | ||
: a. Simulator | |||
: 5. JPM Setup (if required) | |||
: a. None NRC JPM RO EP Page 3 of 8 March 2015 | |||
&=r-Exelon Generation B. Read Before Every JPM Performance | |||
: 1. For the performance of this JPM, I will act as all those you need to talk to. | |||
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | |||
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | ||
Repositioning of devices will be simulated by discussion and acknowledged by my cues. C. Read Before Each Evaluated JPM 1. This evaluated JPM is a measure of your ability to perform this task independently. | Repositioning of devices will be simulated by discussion and acknowledged by my cues. | ||
The CRS has determined that a verifier is not available and that additional verification will not be provided. | C. Read Before Each Evaluated JPM | ||
NRC JPM RO EP Page 4 of 8 March 2015 | : 1. This evaluated JPM is a measure of your ability to perform this task independently. The CRS has determined that a verifier is not available and that additional verification will not be provided. | ||
=::"Exelon Generation | NRC JPM RO EP Page 4 of 8 March 2015 | ||
=::"Exelon Generation Given: | |||
* The plant is operating at approximately 100% power. | * The plant is operating at approximately 100% power. | ||
* You are the CRO. | * You are the CRO. | ||
* You have just received a report from site electricians that there is a significant fire in EDG 102 room. | * You have just received a report from site electricians that there is a significant fire in EDG 102 room. | ||
* The OSC has NOT been activated. | * The OSC has NOT been activated. | ||
Evaluator: | Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), perform EPIP-EPP-28 Attachment 1, CRO Firefighting Checklist. | ||
Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), perform EPIP-EPP-28 Attachment 1, CRO Firefighting Checklist. | : 1. Provide repeat back of initiating cue SAT/ UNSAT p | ||
Provide repeat back of initiating cue Cue: Acknowledge repeat back providing correction if necessary. | Cue: Acknowledge repeat back providing STD: Proper communications correction if necessary. used. | ||
Obtain a copy of the reference procedure and review/ utilize the correct section of the | : 2. Obtain a copy of the reference procedure and SAT I UNSAT review/ utilize the correct section of the STD: Obtains a copy of EPIP-EPP-28. References procedure. p attachment 1, CRO Firefighting Checklist | ||
: 3. Place the GAitronics in the "Merge" Mode. SAT/ UNSAT STD: Places the GAitronics in p the "MERGE" mode by placing the switch on the Communications Console in the Control Room to the "MERGE" position. | |||
NRC JPM RO EP Page 5 of 8 March 2015 | NRC JPM RO EP Page 5 of 8 March 2015 | ||
;S:rExelon Generation | |||
: 4. Sound the fire alarm for 10 seconds and PASS I FAIL announce the fire event. STD: Sounds the fire alarm and Cue: As the Fire Brigade Leader reply that, | ;S:rExelon Generation | ||
"The Fire Brigade is on the way to the 'Attention, Attention, this is a assembly area and I will report on the p drill. A fire has been detected situation as soon as I arrive on the scene." at Unit! in the EOG 102 room The Nine Mile Point Fire Brigade shall report to the Unit 1 assembly area. All other personnel are to remain clear of the EDG 102 room area.' 5. Announce evacuation of EDG 102 room. SAT/ UNSAT STD: Continues on from previous announcement: | : 4. Sound the fire alarm for 10 seconds and PASS I FAIL announce the fire event. | ||
p 'This is a C02 protected area. All personnel shall immediately evacuate the EDG 102 room and all areas adjacent to and below this location.' | STD: Sounds the fire alarm and makes the following Cue: As the Fire Brigade Leader reply that, announcement: | ||
: 6. Take the GAitronics system out of the Merge SAT/ UNSAT Mode STD: Takes GAitronics out of Cue: As the Fire Brigade Leader, report the | "The Fire Brigade is on the way to the 'Attention, Attention, this is a assembly area and I will report on the p drill. A fire has been detected situation as soon as I arrive on the scene." at Unit! in the EOG 102 room The Nine Mile Point Fire Brigade shall report to the Unit 1 assembly area. | ||
assistance. | All other personnel are to remain clear of the EDG 102 room area.' | ||
: 7. Notify the SM of the confirmed fire. SAT/ UNSAT p STD: Proper communicatiOons Role Play: As SM, acknowledge report of used. confirmed fire. 8. Turn up volume on station radio base SAT/ UNSAT console, including Oswego County fire p frequency STD: Volume adjusted appropriately. | : 5. Announce evacuation of EDG 102 room. SAT/ UNSAT STD: Continues on from previous announcement: | ||
NRC JPM RO EP Page 6 of 8 March 2015 | p 'This is a C02 protected area. | ||
All personnel shall immediately evacuate the EDG 102 room and all areas adjacent to and below this location.' | |||
: 6. Take the GAitronics system out of the Merge SAT/ UNSAT Mode STD: Takes GAitronics out of p | |||
Cue: As the Fire Brigade Leader, report the 'Merge' using the communications console. | |||
fire is confirmed and you request off-site fire assistance. | |||
: 7. Notify the SM of the confirmed fire. SAT/ UNSAT p STD: Proper communicatiOons Role Play: As SM, acknowledge report of used. | |||
confirmed fire. | |||
: 8. Turn up volume on station radio base SAT/ UNSAT console, including Oswego County fire p frequency STD: Volume adjusted appropriately. | |||
NRC JPM RO EP Page 6 of 8 March 2015 | |||
=::"Exelon Generation Control room actions for the CRO Firefighting Checklist are complete. | =::"Exelon Generation Control room actions for the CRO Firefighting Checklist are complete. | ||
NRC JPM RO EP Page 7 of 8 March 2015 | NRC JPM RO EP Page 7 of 8 March 2015 | ||
=:rExelon Generation | |||
=:rExelon Generation JPM Handout Given: | |||
* The plant is operating at approximately 100% power. | * The plant is operating at approximately 100% power. | ||
* You are the CRO. | * You are the CRO. | ||
* You have just received a report from site electricians that there is a significant fire in EDG 102 room. | * You have just received a report from site electricians that there is a significant fire in EDG 102 room. | ||
* The OSC has NOT been activated. | * The OSC has NOT been activated. | ||
(Operators Name), perform EPIP-EPP-28 Attachment 1, CRO Firefighting Checklist. | (Operators Name), perform EPIP-EPP-28 Attachment 1, CRO Firefighting Checklist. | ||
Page 8 of 8 March 2015 Training Id: 2015 NRC SRO Admin C001 Revision: | NRC JPM RO EP Page 8 of 8 March 2015 | ||
0.0 Title: Review N1-ST-DO Daily Instrument Checks (Partial) | |||
Training Id: 2015 NRC SRO Admin C001 Revision: 0.0 | |||
==Title:== | |||
Review N1-ST-DO Daily Instrument Checks (Partial) | |||
Approvals: | Approvals: | ||
Signature I Printed Name Developed By &~Paul Isham 5/21/14 Validated By Pat O'Brien 8/19/2014 Facility Reviewer Greg Elkins 2/n/1.1 20 minutes Documentation of Performance: | |||
Performer: | Performer: | ||
Evaluator: | Evaluator: | ||
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | ||
Evaluators Signature: | Evaluators Signature: Date: | ||
Date: NRC JPM SRO COOl Page 1 of 8 | NRC JPM SRO COOl Page 1 of 8 March 2015 | ||
: 1. Nl-ST-00, Daily Checks 2. Unit 1 Technical Specifications | |||
: 3. NUREG 1123, 2.1.7 (4.7) NRC JPM SRO C001 Page 2 of 8 March 2015 Exelon Generation Instructor Information A. JPM Information | Exelon Generation References | ||
: 1. Description | : 1. Nl-ST-00, Daily Checks | ||
: a. This JPM tests the senior operator's ability to evaluate plant surveillance data and determine applicable tech spec actions for failed equipment. | : 2. Unit 1 Technical Specifications | ||
: 2. Task Information: | : 3. NUREG 1123, 2.1.7 (4.7) | ||
: a. NS-REL-03002, Review Results of Surveillance Tests to Ensure Compliance with Specifications. | NRC JPM SRO C001 Page 2 of 8 March 2015 | ||
: b. K/A 2.1.7 (4.7), Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation. | |||
: 3. Evaluation | Exelon Generation Instructor Information A. JPM Information | ||
/Task Criteria Perform Classroom No No Yes 4. Recommended Start Location | : 1. Description | ||
: a. Training Classroom NRC JPM SRO COOl Page 3 of 8 March 2015 | : a. This JPM tests the senior operator's ability to evaluate plant surveillance data and determine applicable tech spec actions for failed equipment. | ||
=:r-Exelon Generation | : 2. Task Information: | ||
: 5. JPM Setup (if required) | : a. NS-REL-03002, Review Results of Surveillance Tests to Ensure Compliance with Specifications. | ||
: a. Provide copy of Nl-ST-DO with Attachment 4 section 6.0 and step 8.4 completed with the following values: | : b. K/A 2.1.7 (4.7), Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation. | ||
-72" K-Panel Vessel Level Indicator | : 3. Evaluation /Task Criteria Perform Classroom No No Yes | ||
-72" K-Panel Flange Level Indicator | : 4. Recommended Start Location | ||
-DOWNSCALE Reactor Vessel Level Recorder | : a. Training Classroom NRC JPM SRO COOl Page 3 of 8 March 2015 | ||
-71" Wide Range Level Indicator | |||
-7' GEMAC Level Column (Ch 11/12) -71" I 79" GEMAC Level Computer Points (Ch 11/12) -71.344" / 79.051" Pi Calculated GEMAC level column difference | =:r-Exelon Generation | ||
-7.680" RPS Level Column (Ch 11/12) -73"/76" Yarway (RPS) Level Column -73.125"/75. | : 5. JPM Setup (if required) | ||
763" Pi Calculated Yarway level column difference | : a. Provide copy of Nl-ST-DO with Attachment 4 section 6.0 and step 8.4 completed with the following values: section 6.0: | ||
-2. 770" GEMAC variance | Low-Low Level Alarms - Checked "NO" Feedwater Level Column - Checked "11" E-Panel Vessel Level Indicator - 72" K-Panel Vessel Level Indicator - 72" K-Panel Flange Level Indicator - DOWNSCALE Reactor Vessel Level Recorder - 71" Wide Range Level Indicator - 7' GEMAC Level Column (Ch 11/12) - 71" I 79" GEMAC Level Computer Points (Ch 11/12) - 71.344" / 79.051" Pi Calculated GEMAC level column difference - 7.680" RPS Level Column (Ch 11/12) - 73"/76" Yarway (RPS) Level Column - 73.125"/75. 763" Pi Calculated Yarway level column difference - 2. 770" GEMAC variance - 8" Computer point variance - 7. 707" Total Recirc Flow - 38.0 Mlbm/hr Step 8.4: | ||
-8" Computer point variance | Check "Pi-Calculated GEMAC Level Delta" Check "Acceptable Range" | ||
-7. 707" Total Recirc Flow -38.0 Mlbm/hr Step 8.4: Check "Pi-Calculated GEMAC Level Delta" Check "Acceptable Range" b. If multiple operators are going to perform the JPM at the same time, ensure each operator has a copy of Nl-ST-DO. | : b. If multiple operators are going to perform the JPM at the same time, ensure each operator has a copy of Nl-ST-DO. | ||
NRC JPM SRO COOl Page 4 of 8 March 2015 Exelon Generation B. Read Before Every JPM Performance | NRC JPM SRO COOl Page 4 of 8 March 2015 | ||
: 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. | |||
During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | Exelon Generation B. Read Before Every JPM Performance | ||
: 1. For the performance of this JPM, I will act as all those you need to talk to. | |||
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | |||
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | ||
Repositioning of devices will be simulated by discussion and acknowledged by my cues. c. Read Before Each Evaluated JPM 1. This evaluated JPM is a measure of your ability to perform this task independently. | Repositioning of devices will be simulated by discussion and acknowledged by my cues. | ||
The CRS has determined that a verifier is not available and that additional verification will not be provided. | : c. Read Before Each Evaluated JPM | ||
NRC JPM SRO COOl Page 5 of 8 March 2015 | : 1. This evaluated JPM is a measure of your ability to perform this task independently. The CRS has determined that a verifier is not available and that additional verification will not be provided. | ||
NRC JPM SRO COOl Page 5 of 8 March 2015 | |||
Exelon Generation Given: | |||
* The plant is operating at approximately 67% power. | * The plant is operating at approximately 67% power. | ||
* Nl-ST-DO, Daily Checks, is in progress. | * Nl-ST-DO, Daily Checks, is in progress. | ||
* Operators have completed the RPV water level instrument readings. | * Operators have completed the RPV water level instrument readings. | ||
Evaluator: | Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), perform SRO review of the following section of Nl-ST-DO: | ||
Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), perform SRO review of the following section of ST-DO: | |||
* Attachment 4 section 6.0 | * Attachment 4 section 6.0 | ||
* Step 8.4 When completed, report findings to the Examiner. | * Step 8.4 When completed, report findings to the Examiner. | ||
Provide repeat back of initiating cue Cue: Acknowledge repeat back providing p correction if necessary. | : 1. Provide repeat back of initiating cue SAT/ UNSAT Cue: Acknowledge repeat back providing p STD: Proper communications correction if necessary. used. | ||
Obtain a copy of the reference procedure and review / utilize the correct section of the p procedure. | : 2. Obtain a copy of the reference procedure and SAT/ UNSAT review / utilize the correct section of the p STD: N1-ST-DO Obtained procedure. | ||
Review Attachment 4 section 6.0 readings and Step 8.4 p | : 3. Review Attachment 4 section 6.0 readings SAT/ UNSAT and Step 8.4 p STD: Reviews Attachment 4 section 6.0 and step 8.4 readings | ||
: 4. Identifies error in Step 8.4 PASS/ FAIL p STD: Identifies that GEMAC Level Column Variance is in the | |||
Determines GEMAC 12 level indicator is | !NOP range NRC JPM SRO C001 Page 6 of 8 March 2015 | ||
Out of spec results are identified and the appropriate Technical Specification is determined. | |||
NRC JPM SRO COOl Page 7 of 8 March 2015 Exelon Generation | Exelon Generation If Candidate asks for prior readings for comparison, or for Engineering evaluation, report that plant data indicates GEMAC 11 is trending normally and GEMAC 12 indicates higher than expected. | ||
: 5. Determines GEMAC 12 level indicator is p PASS/ FAIL inoperable STD: Determines GEMAC 12 level indicator is inoperable | |||
: 6. Determines Technical Specification impact p PASS I FAIL STD: Determines a 15 day LCO applies per Technical Specification 3.1.8 | |||
: 7. Provides completed sections to Examiner and p SAT/ UNSAT informs of out of spec readings STD: Proper communications used Control room RPV water level instrument surveillance per Nl-ST-DO is reviewed. Out of spec results are identified and the appropriate Technical Specification is determined. | |||
NRC JPM SRO COOl Page 7 of 8 March 2015 | |||
Exelon Generation JPM Handout Given: | |||
* The plant is operating at approximately 67% power. | * The plant is operating at approximately 67% power. | ||
* Nl-ST-DO, Daily Checks, is in progress. | * Nl-ST-DO, Daily Checks, is in progress. | ||
* Operators have completed the RPV water level instrument readings. | * Operators have completed the RPV water level instrument readings. | ||
(Operators Name), perform SRO review of the following section of ST-DO: | (Operators Name), perform SRO review of the following section of Nl-ST-DO: | ||
* Attachment 4 section 6.0 | * Attachment 4 section 6.0 | ||
* Step 8.4 When completed, report findings to the Examiner. | * Step 8.4 When completed, report findings to the Examiner. | ||
Page 8 of 8 March 2015 | NRC JPM SRO COOl Page 8 of 8 March 2015 | ||
=::rExelon Generation Training Id: 2015 NRC RO-SRO Admin C002 Revision: | |||
0.0 Title: Determine Personnel Overtime Availability IAW CNG-SE-1.01-1002 Approvals: | =::rExelon Generation Training Id: 2015 NRC RO-SRO Admin C002 Revision: 0.0 | ||
20/30 minutes (RO/SRO) | ==Title:== | ||
Determine Personnel Overtime Availability IAW CNG-SE-1.01-1002 Approvals: | |||
Signature I Printed Name Developed By µ~ Pau/Isham 5/21/14 Validated By Pat O'Brien 8/19/2014 Facility Reviewer Greg Elkins z/t J Its-Approximate Duration: 20/30 minutes (RO/SRO) | |||
Documentation of Performance: | Documentation of Performance: | ||
Performer: | Performer: | ||
Evaluator: | Evaluator: | ||
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | ||
Evaluators Signature: | Evaluators Signature: Date: | ||
Date: NRC JPM RO-SRO C002 Page 1of13 | NRC JPM RO-SRO C002 Page 1of13 March 2015 | ||
Generation References | =~Exelon Generation References | ||
: 1. CNG-SE-1.01-1002 | : 1. CNG-SE-1.01-1002 | ||
: 2. NUREG 1123, 2.1.5 (2.9/3.9) | : 2. NUREG 1123, 2.1.5 (2.9/3.9) | ||
NRC JPM RO-SRO C002 Page 2 of 13 March 2015 Exelon Generation Instructor Information A. JPM Information | NRC JPM RO-SRO C002 Page 2 of 13 March 2015 | ||
: 1. Description | |||
: a. This JPM tests the operator's ability to evaluate plant surveillance data and determine applicable tech spec actions for failed equipment. | Exelon Generation Instructor Information A. JPM Information | ||
: 2. Task Information: | : 1. Description | ||
: | : a. This JPM tests the operator's ability to evaluate plant surveillance data and determine applicable tech spec actions for failed equipment. | ||
: b. GAP-FFD02-00004, | : 2. Task Information: | ||
: a. GAP-FFD02-00002, Maintain working hours within overtime guidelines. | |||
: c. K/A 2.1.5 (2.9/3.9), | : b. GAP-FFD02-00004, Initiate, review and approve an overtime waiver with Empcenter unavailable. | ||
Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc. Evaluation | : c. K/A 2.1.5 (2.9/3.9), Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc. | ||
/Task Criteria Perform Classroom No No Yes Recommended Start Location | : 3. Evaluation /Task Criteria Perform Classroom No No Yes | ||
: a. Training Classroom NRC JPM RO-SRO C002 Page 3 of 13 March 2015 | : 4. Recommended Start Location | ||
=:r-Exelon Generation | : a. Training Classroom NRC JPM RO-SRO C002 Page 3 of 13 March 2015 | ||
: 5. JPM Setup (if required) | |||
: a. Provide copy of CNG-SE-1.01-1002. | =:r-Exelon Generation | ||
: b. If multiple operators are going to perform the JPM at the same time, ensure each operator has a copy of CNG-SE-1.01-1002. | : 5. JPM Setup (if required) | ||
: c. Provide extra copies of CNG-SE-1.01-1002, attachment | : a. Provide copy of CNG-SE-1.01-1002. | ||
: b. If multiple operators are going to perform the JPM at the same time, ensure each operator has a copy of CNG-SE-1.01-1002. | |||
: 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. | : c. Provide extra copies of CNG-SE-1.01-1002, attachment 1. | ||
During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | NRC JPM RO-SRO C002 Page 4 of 13 March 2015 | ||
Exelon Generation B. Read Before Every JPM Performance | |||
: 1. For the performance of this JPM, I will act as all those you need to talk to. | |||
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | |||
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | ||
Repositioning of devices will be simulated by discussion and acknowledged by my cues. C. Read Before Each Evaluated JPM 1. This evaluated JPM is a measure of your ability to perform this task independently. | Repositioning of devices will be simulated by discussion and acknowledged by my cues. | ||
The CRS has determined that a verifier is not available and that additional verification will not be provided. | C. Read Before Each Evaluated JPM | ||
NRC JPM RO-SRO C002 Page 5 of 13 March 2015 | : 1. This evaluated JPM is a measure of your ability to perform this task independently. The CRS has determined that a verifier is not available and that additional verification will not be provided. | ||
=:r-Exelon Generation | NRC JPM RO-SRO C002 Page 5 of 13 March 2015 | ||
=:r-Exelon Generation Given: | |||
* The plant is shutdown for a refueling outage. | * The plant is shutdown for a refueling outage. | ||
* Current time is 2200 on November 27, 2014. | * Current time is 2200 on November 27, 2014. | ||
Line 248: | Line 311: | ||
* November 14, 2014 through November 28, 2014 is a fixed 15-day period for work hour rule considerations. | * November 14, 2014 through November 28, 2014 is a fixed 15-day period for work hour rule considerations. | ||
* EmpCenter is NOT available. | * EmpCenter is NOT available. | ||
Evaluator: | Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operator Name), | ||
Ask trainee if he/she has any questions after presenting initial conditions (Operator Name), 1. From the provided list of personnel working hours, determine who is eligible to work a complete 12 hour shift beginning at 0630 on November 28 without exceeding the limits of CNG-SE-1.01-1002. | : 1. From the provided list of personnel working hours, determine who is eligible to work a complete 12 hour shift beginning at 0630 on November 28 without exceeding the limits of CNG-SE-1.01-1002. | ||
: 2. If a Work Hour Limits Waiver would be required for any individual(s), | : 2. If a Work Hour Limits Waiver would be required for any individual(s), state the work hour limit(s) which would be exceeded IAW CNG-SE-1.01-1002. | ||
state the work hour limit(s) which would be exceeded IAW CNG-SE-1.01-1002. | : 1. Provide repeat back of initiating cue SAT I UNSAT p | ||
Provide repeat back of initiating cue Cue: Acknowledge repeat back providing correction if necessary. | Cue: Acknowledge repeat back providing STD: Proper communications correction if necessary. used. | ||
Obtain a copy of the reference procedure and review / utilize the correct section of the | : 2. Obtain a copy of the reference procedure and SAT/ UNSAT review / utilize the correct section of the p STD: CNG-SE-1.01-1002 procedure. | ||
Obtained NRC JPM RO-SRO C002 Page 6 of 13 March 2015 | |||
: 3. Reviews work hours for Reactor Operators | |||
#1 through #3 4. SRO Only -Completes CNG-SE-1.01-1002 Attachment 1 Section 1 for RO #2 Cue: Give SRO additional cue sheet and blank CNG-SE-1.01-1002 Attachment 1 Section 1. Direct the SRO to complete CNG-SE-1.01-1002, Attachment 1 for RO #2. Note: Only items 1) and 2) of CNG-SE-1.01-1002 Attachment 1 Section 1 are deemed critical for evaluation of this step. | Exelon Generation | ||
: 3. Reviews work hours for Reactor Operators PASS/ FAIL | |||
#1 through #3 STD: Determines the following: | |||
RO #1 - Not Eligible - Would work more than 26 hours in a 48 hour p period OR <10 hours between shifts. (step 5.2.A.2.a) | |||
RO #2 - Not Eligible - Would work more than 72 hours in a 7 day period RO #3 - Eligible | |||
For SROs, CNG-SE-1.01-1002 Attachment 1 Section 1 completed for RO #2. NRC JPM RO-SRO C002 Page 7 of 13 March 2015 Exelon Generation RO-SRO JPM Handout Given: | : 4. SRO Only - Completes CNG-SE-1.01-1002 PASS I FAIL Attachment 1 Section 1 for RO #2 STD: Completes CNG-SE-1.01-1002 Attachment 1 Section 1 Cue: Give SRO additional cue sheet and for RO #2, per attached key blank CNG-SE-1.01-1002 Attachment 1 Section 1. Direct the SRO to complete CNG-SE-1.01-1002, p Attachment 1 for RO #2. | ||
Note: Only items 1) and 2) of CNG-SE-1.01-1002 Attachment 1 Section 1 are deemed critical for evaluation of this step. | |||
JPM Attachment B completed. For SROs, CNG-SE-1.01-1002 Attachment 1 Section 1 completed for RO #2. | |||
NRC JPM RO-SRO C002 Page 7 of 13 March 2015 | |||
Exelon Generation RO-SRO JPM Handout Given: | |||
* The plant is shutdown for a refueling outage. | * The plant is shutdown for a refueling outage. | ||
* Current time is 2200 on November 27, 2014. | * Current time is 2200 on November 27, 2014. | ||
Line 268: | Line 336: | ||
* All the overtime hours will be spent performing control room activities. | * All the overtime hours will be spent performing control room activities. | ||
* November 14, 2014 through November 28, 2014 is a fixed 15-day period for work hour rule considerations. | * November 14, 2014 through November 28, 2014 is a fixed 15-day period for work hour rule considerations. | ||
* EmpCenter is NOT available. | * EmpCenter is NOT available. | ||
(Operator Name), | (Operator Name), | ||
: 2. If a Work Hour Limits Waiver would be required for any individual(s), | : 1. From the provided list of personnel working hours, determine who is eligible to work a complete 12 hour shift beginning at 0630 on November 28 without exceeding the limits of CNG-SE-1.01-1002. | ||
state the work hour limit(s) which would be exceeded IAW CNG-SE-1.01-1002. | : 2. If a Work Hour Limits Waiver would be required for any individual(s), state the work hour limit(s) which would be exceeded IAW CNG-SE-1.01-1002. | ||
Page 8 of 13 March 2015 | NRC JPM RO-SRO C002 Page 8 of 13 March 2015 | ||
=::'"Exelon Generation SRO ONLY Additional JPM Handout Given: | =::'"Exelon Generation SRO ONLY Additional JPM Handout Given: | ||
* ROs #1 and #3 have not been able to be contacted. | * ROs #1 and #3 have not been able to be contacted. | ||
* RO #2 is the only operator available and will be required to work. (Operator Name), Complete CNG-SE-1.01-1002, Attachment 1, 10 CFR 26 Work Hour Limits Waiver, Section 1, for RO #2 to cover this shift on November | * RO #2 is the only operator available and will be required to work. | ||
(Operator Name), Complete CNG-SE-1.01-1002, Attachment 1, 10 CFR 26 Work Hour Limits Waiver, Section 1, for RO #2 to cover this shift on November 28. | |||
NRC JPM RO-SRO C002 Page 9 of 13 March 2015 | |||
Exelon Generation Attachment A - Work Hours RO#l 11/10 11/11 11/12 11/13 11/14 11/15 11/16 11/17 11/18 11/19 11/20 11/21 11/22 11/23 11/24 11/25 11/26 11/27 11/28 0630 0630 0630 0630 0630 0630 0630 0630 0630 0630 0630 0630 OFF - - OFF OFF - - - - OFF OFF - OFF - - - - - ? | |||
1830 1830 1830 1830 1830 2030 1830 1830 1830 1830 1530 2130 R0#2 11/10 11/11 11/12 11/13 11/14 11/15 11/16 11/17 11/18 11/19 11/20 11/21 11/22 11/23 11/24 11/25 11/26 11/27 11/28 0630 0730 0630 0630 0630 0630 0630 0630 0630 0630 0630 0630 0630 OFF - - OFF OFF - - - - - OFF OFF - - - - - - ? | |||
2130 1730 1830 1830 1830 2030 1830 1830 1830 1830 1830 1830 1830 R0#3 11/10 11/11 11/12 11/13 11/14 11/15 11/16 11/17 11/18 11/19 11/20 11/21 11/22 11/23 11/24 11/25 11/26 11/27 11/28 0630 0630 0630 0630 0630 0630 0630 0630 0630 0630 0630 0630 | |||
- - OFF - OFF OFF - - - - - OFF OFF - - - - OFF ? | |||
1830 1830 1830 1830 1830 1630 2030 1830 1830 2030 1830 1830 NRC JPM RO-SRO C002 Page 10 of 13 March 2015 | |||
Exelon Generation Attachment B - Answer Sheet Eligible to work without a If No, what work hour Work Hour Limits Waiver? limit(s) would be exceeded (Yes/No) | |||
IAW CNG-SE-1.01-1002? | IAW CNG-SE-1.01-1002? | ||
RO #1 RO #2 RO #3 NRC JPM RO-SRO C002 Page 11of13 March 2015 Exelon Generation Training Id: 2015 NRC RO-SRO Admin EC Revision: | RO #1 RO #2 RO #3 NRC JPM RO-SRO C002 Page 11of13 March 2015 | ||
0.0 | |||
ature Printed Name Developed By | Exelon Generation Training Id: 2015 NRC RO-SRO Admin EC Revision: 0.0 | ||
.r.,,,,, | |||
r Paul Isham 5/21/14 Validated By Pat O'Brien 8/19/14 Facility Reviewer Approximate Duration: | ==Title:== | ||
20 minutes Documentation of Performance: | Perform Daily Thermal Limit Surveillance Approvals: | ||
ature Printed Name 7~/~~** | |||
Developed By .r.,,,,, r ~ Paul Isham 5/21/14 Validated By Pat O'Brien 8/19/14 Facility Reviewer Approximate Duration: 20 minutes Documentation of Performance: | |||
Performer: | Performer: | ||
Evaluator: | Evaluator: | ||
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | ||
Evaluators Signature: | Evaluators Signature: Date: | ||
Date: | NRC JPM RO-SRO EC Page 1 of 8 March 2015 | ||
Generation B. Read Before Every JPM Performance | Exelon Generation References | ||
: 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. | : 1. Nl-RESP-lA, Daily Thermal Limit Surveillance Short Form | ||
During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | : 2. 30 Monicore | ||
: 3. NU REG 1123, 2.2.12 (3. 7/4.1) | |||
NRC JPM RO-SRO EC Page 2 of 8 March 2015 | |||
Exelon Generation Instructor Information A. JPM Information | |||
: 1. Description | |||
: a. This JPM tests the operator's ability to evaluate plant thermal limits in accordance with surveillance requirements. | |||
: 2. Task Information: | |||
: a. NS-REL-03002, Review Results of Surveillance Tests to Ensure Compliance with Specifications. | |||
: b. K/A 2.2.12 (3. 7/4.1), Knowledge of Surveillance Procedures. | |||
: 3. Evaluation/ Task Criteria Perform Classroom No No Yes | |||
: 4. Recommended Start Location | |||
: a. Training Classroom | |||
: 5. JPM Setup (if required) | |||
: a. Provide two 30 Monicore cases ("today's" and "yesterday's"). Yesterday's case should be normal. Today's case should have MFLCPR edited to be above 1.0 with MCPR edited accordingly. | |||
: b. Provide enough copies of Nl-RESP-lA completed up to section 8.2.2. | |||
: c. Ensure tech specs are available for SROs NRC JPM RO-SRO EC Page 3 of 8 March 2015 | |||
=~Exelon Generation B. Read Before Every JPM Performance | |||
: 1. For the performance of this JPM, I will act as all those you need to talk to. | |||
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | |||
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | ||
Repositioning of devices will be simulated by discussion and acknowledged by my cues. C. Read Before Each Evaluated JPM 1. This evaluated JPM is a measure of your ability to perform this task independently. | Repositioning of devices will be simulated by discussion and acknowledged by my cues. | ||
The CRS has determined that a verifier is not available and that additional verification will not be provided. | C. Read Before Each Evaluated JPM | ||
NRC JPM RO-SRO EC Page 4 of 8 March 2015 | : 1. This evaluated JPM is a measure of your ability to perform this task independently. The CRS has determined that a verifier is not available and that additional verification will not be provided. | ||
NRC JPM RO-SRO EC Page 4 of 8 March 2015 | |||
Exelon Generation Given: | |||
* The plant is operating at approximately 100% power with 5 Recirculation pumps in service. | * The plant is operating at approximately 100% power with 5 Recirculation pumps in service. | ||
* No change in power or control rod position has occurred since the current 30 Monicore case was generated. | * No change in power or control rod position has occurred since the current 30 Monicore case was generated. | ||
* The following data is provided: | * The following data is provided: | ||
Computer Point A-390 reads 354°F Computer Point A-392 reads 352°F LEFM Flow correction factor process computer point J385 reads 0. 9990 LEFM Flow correction factor process computer point J386 reads 0. 9907 LEFM Flow correction factor from CRC Book -West = O. 9990 LEFM Flow correction factor from CRC Book -East= 0.9907 Evaluator: | Computer Point A-390 reads 354°F Computer Point A-392 reads 352°F LEFM Flow correction factor process computer point J385 reads 0. 9990 LEFM Flow correction factor process computer point J386 reads 0. 9907 LEFM Flow correction factor from CRC Book - West = O. 9990 LEFM Flow correction factor from CRC Book - East= 0.9907 Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), perform the Daily Thermal Limit Surveillance in accordance with N1-RESP-1A, section 8.2. | ||
Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), perform the Daily Thermal Limit Surveillance in accordance with N1-RESP-1A, section 8.2. Provide repeat back of initiating cue Cue: Acknowledge repeat back providing correction if necessary. | : 1. Provide repeat back of initiating cue SAT/ UNSAT Cue: Acknowledge repeat back providing p STD: Proper communications correction if necessary. used. | ||
Obtain a copy of the reference procedure and review / utilize the correct section of the | : 2. Obtain a copy of the reference procedure and SAT/ UNSAT review / utilize the correct section of the p STD: N1-RESP-1A and 30 procedure. | ||
Monicore cases obtained Provide copies of N1-RESP-1A and 30 monicore case edits (current and previous day). Only provide N1-0P-16, attachment 4 if requested. | |||
NRC JPM RO-SRO EC Page 5 of 8 March 2015 | NRC JPM RO-SRO EC Page 5 of 8 March 2015 | ||
: 3. | |||
The items circled in blue are the critical steps (8.2.5, 8.2.6, 8.2.7, and 8.2.9). Role Play: If asked how to proceed at step 8.2.6 with MFLCPR above 1.0, acknowledge condition and direct the Candidate to complete the rest of section 8.2. Identify discrepancy in Nl-RESP-lA section 8.2 SRO Only Cue: Once the SRO Candidate has identified MFLCPR/MCPR violation, direct them to determine the required action for this condition. | Exelon Generation | ||
SRO Only -Determine required action for | : 3. Complete Nl-RESP-lA section 8.2 PASS/ FAIL Note: Refer to KEY for completed STD: Nl-RESP-lA completed per the key surveillance. The items circled in blue are the critical steps (8.2.5, 8.2.6, 8.2.7, and 8.2.9). p Role Play: If asked how to proceed at step 8.2.6 with MFLCPR above 1.0, acknowledge condition and direct the Candidate to complete the rest of section 8.2. | ||
=:rExelon Generation | : 4. Identify discrepancy in Nl-RESP-lA section PASS/ FAIL 8.2 STD: Identifies that SRO Only Cue: Once the SRO Candidate p MFLCPR/MCPR have exceeded has identified MFLCPR/MCPR violation, direct the limit them to determine the required action for this condition. | ||
For SRO Candidates, required actions identified. | : 5. SRO Only - Determine required action for p PASS/ FAIL MFLCPR/MCPR violation STD: Determines Technical Specification 3.1. 7 .c is not met. | ||
Page 7 of 8 March 2015 Exelon Generation | p PASS/ FAIL STD: Determines action shall be initiated within 15 minutes to restore operation to within the prescribed limit. If all the operating MCPRs are not returned to within the prescribed limit within two (2) hours, reactor power reductions shall be initiated at a rate not less than 10% per hour until MCPR is within the prescribed limit. | ||
NRC JPM RO-SRO EC Page 6 of 8 March 2015 | |||
=:rExelon Generation Daily thermal limit surveillance completed in accordance with N1-RESP-1A section 8.2, with all discrepancies identified. For SRO Candidates, required actions identified. | |||
NRC JPM RO-SRO EC Page 7 of 8 March 2015 | |||
Exelon Generation JPM Handout Given: | |||
* The plant is operating at approximately 100% power with 5 Recirculation pumps in service. | * The plant is operating at approximately 100% power with 5 Recirculation pumps in service. | ||
* No change in power or control rod position has occurred since the current 3D Monicore case was generated. | * No change in power or control rod position has occurred since the current 3D Monicore case was generated. | ||
* The following data is provided: | * The following data is provided: | ||
Computer Point A-390 reads 354°F Computer Point A-392 reads 352°F LEFM Flow correction factor process computer point J385 reads 0.9990 LEFM Flow correction factor process computer point J386 reads 0.9907 LEFM Flow correction factor from CRC Book -West = 0.9990 LEFM Flow correction factor from CRC Book -East = 0. 9907 (Operators Name), perform the Daily Thermal Limit Surveillance in accordance with N1-RESP-1A, section 8.2. Page 8 of 8 March 2015 Exelon Generation Training Id: 2015 NRC SRO Admin RC Revision: | Computer Point A-390 reads 354°F Computer Point A-392 reads 352°F LEFM Flow correction factor process computer point J385 reads 0.9990 LEFM Flow correction factor process computer point J386 reads 0.9907 LEFM Flow correction factor from CRC Book - West = 0.9990 LEFM Flow correction factor from CRC Book - East = 0. 9907 (Operators Name), perform the Daily Thermal Limit Surveillance in accordance with N1-RESP-1A, section 8.2. | ||
0.0 | NRC JPM RO-SRO EC Page 8 of 8 March 2015 | ||
-Emergency Exposure for Local MSIV Title: Closure Approvals: | |||
Developed By Paul Isham 5/21/14 Validated By Pat O'Brien 8/19/2014 Facility Reviewer Greg Elkins z/;7 ft-Approximate Duration: | Exelon Generation Training Id: 2015 NRC SRO Admin RC Revision: 0.0 Determine Radiation Controls - Emergency Exposure for Local MSIV | ||
20 minutes Documentation of Performance: | |||
==Title:== | |||
Closure Approvals: | |||
Developed By Paul Isham 5/21/14 Validated By Pat O'Brien 8/19/2014 Facility Reviewer Greg Elkins z/;7 ft-Approximate Duration: 20 minutes Documentation of Performance: | |||
Performer: | Performer: | ||
Evaluator: | Evaluator: | ||
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | ||
Evaluators Signature: | Evaluators Signature: Date: | ||
Date: NRC JPM SRO RC Page 1of10 March 2015 | NRC JPM SRO RC Page 1of10 March 2015 | ||
=~Exelon Generation References | |||
: 1. GAP-RPP-07, Internal and External Dosimetry Program | |||
: 2. S-RAP-RPP-0703, Authorization to Exceed Administrative Dose Limits | |||
: 3. CNG-EP-1.01-1014, Emergency Exposures and KI | |||
: 4. NUREG 1123, 2.3.4 (3.7) | |||
NRC JPM SRO RC Page 2 of 10 March 2015 | |||
Generation | =~Exelon Generation Instructor Information A. JPM Information | ||
: 1. | : 1. Description | ||
: a. This JPM is used to test generic knowledge in calculation of overall dose and control mechanisms to allow the selection of individuals to continue or perform work in high dose areas. This JPM tests basic mathematics and understanding of stay times and remaining dose limitations under normal operating conditions given normal quarterly dose limitations. | |||
: 2. Task Information: | |||
: a. GAP-RPP07-00002, Comply with administrative exposure limits | |||
: b. K/A 2.3.4 (3.7), Knowledge of radiation exposure limits under normal or emergency conditions. | |||
: 3. Evaluation/ Task Criteria Perform Classroom No No Yes | |||
: 4. Recommended Start Location | |||
: a. Training Classroom NRC JPM SRO RC Page 3 of 10 March 2015 | |||
Exelon Generation | |||
: 5. JPM Setup (if required) | |||
: 5. JPM Setup (if required) | |||
: a. Ensure sufficient copies of the following procedures are available in the exam area: | : a. Ensure sufficient copies of the following procedures are available in the exam area: | ||
* GAP-RPP-07 | * GAP-RPP-07 | ||
Line 357: | Line 461: | ||
* CNG-EP-1.01-1014 | * CNG-EP-1.01-1014 | ||
* EP-Form-ALL08 (2 per applicant) | * EP-Form-ALL08 (2 per applicant) | ||
NRC JPM SRO RC Page 4 of 10 March 2015 Exelon Generation B. Read Before Every JPM Performance | NRC JPM SRO RC Page 4 of 10 March 2015 | ||
: 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. | |||
During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | Exelon Generation B. Read Before Every JPM Performance | ||
: 1. For the performance of this JPM, I will act as all those you need to talk to. | |||
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | |||
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | ||
Repositioning of devices will be simulated by discussion and acknowledged by my cues. c. Read Before Each Evaluated JPM 1. This evaluated JPM is a measure of your ability to perform this task independently. | Repositioning of devices will be simulated by discussion and acknowledged by my cues. | ||
The CRS has determined that a verifier is not available and that additional verification will not be provided. | : c. Read Before Each Evaluated JPM | ||
NRC JPM SRO RC Page 5 of 10 March 2015 Exelon Generation | : 1. This evaluated JPM is a measure of your ability to perform this task independently. The CRS has determined that a verifier is not available and that additional verification will not be provided. | ||
NRC JPM SRO RC Page 5 of 10 March 2015 | |||
Exelon Generation Given: | |||
* The plant is at 15% power. | * The plant is at 15% power. | ||
* A Site Area Emergency has been declared due to a steam line rupture with significant fuel damage. | * A Site Area Emergency has been declared due to a steam line rupture with significant fuel damage. | ||
* Entry is required into the MSIV Room to close the outboard MSIVs to prevent event escalation. | * Entry is required into the MSIV Room to close the outboard MSIVs to prevent event escalation. | ||
* Job conditions are as follows: | * Job conditions are as follows: | ||
o Two individuals are required to complete the job. o Each worker is expected to receive 575 mR in transit to the Main Steam line access door AND the same amount again while exiting the plant. o Each worker is expected to spend 2 minutes in an 800 mR/hr field in transit from the Main Steam line access door to the job site. o The job site is against the outer Containment Wall in a 1.9 R/hr field. o The job will take 2 hours at the job site with both workers working the full time. o Each worker is expected to spend 3 minutes in an 800 mR/hr field in transit from the job site to the Main Steam line access door. | o Two individuals are required to complete the job. | ||
* Two workers are briefed to complete the task. o Technician 1 -John Technician | o Each worker is expected to receive 575 mR in transit to the Main Steam line access door AND the same amount again while exiting the plant. | ||
-Maintenance | o Each worker is expected to spend 2 minutes in an 800 mR/hr field in transit from the Main Steam line access door to the job site. | ||
-SS # 123 | o The job site is against the outer Containment Wall in a 1.9 R/hr field. | ||
-SS# 987-65-4321 | o The job will take 2 hours at the job site with both workers working the full time. | ||
-TLD# 235699 | o Each worker is expected to spend 3 minutes in an 800 mR/hr field in transit from the job site to the Main Steam line access door. | ||
* During an initial entry under a modified RWP the workers received the following dose: o Technician 1 received 900 mR on his Electronic Dosimeter from his first entry, resulting in a total exposure of 1678 mR for the year. o Technician 2 received 600 mR on his Electronic Dosimeter from his first entry, resulting in a total exposure of 1399 mR for the year. | * Two workers are briefed to complete the task. | ||
o Technician 1 - John Technician - Maintenance - SS # 123 6789 - TLD # 145678 o Technician 2 - James Worker - Operations - SS# 987-65-4321 | |||
- TLD# 235699 | |||
* During an initial entry under a modified RWP the workers received the following dose: | |||
o Technician 1 received 900 mR on his Electronic Dosimeter from his first entry, resulting in a total exposure of 1678 mR for the year. | |||
o Technician 2 received 600 mR on his Electronic Dosimeter from his first entry, resulting in a total exposure of 1399 mR for the year. | |||
* The TSC has not been staffed and the RAC is in route to the site. | * The TSC has not been staffed and the RAC is in route to the site. | ||
* Emergency exposure controls have not been implemented. | * Emergency exposure controls have not been implemented. | ||
Evaluator: | Evaluator: Ask trainee if he/she has any questions a~er presenting initial conditions (Operators Name), Anticipate dose to be accumulated by each worker. | ||
Ask trainee if he/she has any questions presenting initial conditions (Operators Name), Anticipate dose to be accumulated by each worker. Authorize work using the appropriate exposure limits to allow completion of the required task per CNG-EP-1.01-1014 and GAP-RPP-07. | Authorize work using the appropriate exposure limits to allow completion of the required task per CNG-EP-1.01-1014 and GAP-RPP-07. | ||
Page 6 of 10 March 2015 Exelon Generation | NRC JPM SRO RC Page 6 of 10 March 2015 | ||
: 1. Provide repeat back of initiating cue SAT/ UNSAT Cue: Acknowledge repeat back providing | |||
used. 2. Obtain a copy of the reference procedure and SAT I UNSAT review/ utilize the correct section of the p procedure. | Exelon Generation | ||
STD: CNG-EP-1.01-1014 and GAP-RPP-07 Obtained | : 1. Provide repeat back of initiating cue SAT/ UNSAT p | ||
: 3. For each worker: 3a Determine anticipated dose from task SAT I UNSAT performance in the work area. p STD: Dose Rate *Time= Task Dose 1900 mR/hr | Cue: Acknowledge repeat back providing STD: Proper communications correction if necessary. used. | ||
* 2hr = 3800 mR 3b Determine anticipated dose from transit to p SAT I UNSAT and from the Main Steam chase STD: 2 x Transit dose (To and From) 2*575mR = 1150mR 3c Determine anticipated dose from transit to p SAT I UNSAT the work area in the steam chase. STD: Dose Rate *Time=Transit Dose 800mR/hr* | : 2. Obtain a copy of the reference procedure and SAT I UNSAT review/ utilize the correct section of the p procedure. STD: CNG-EP-1.01-1014 and GAP-RPP-07 Obtained | ||
(2min/60)=26. | : 3. For each worker: | ||
7mR 3d Determine anticipated dose from transit from p SAT/ UNSAT the work area in the steam chase. STD: Dose Rate *Time=Transit Dose 800mR/hr | 3a Determine anticipated dose from task SAT I UNSAT performance in the work area. | ||
* (3min/60)=40mR 3e Determine the total dose for each worker p PASS/ FAIL from 3a through 3d. STD: Add 3a-3d = 5016.7mR NRC JPM SRO RC Page 7 of 10 March 2015 | p STD: | ||
=;:r Exelon Generation | Dose Rate *Time= Task Dose 1900 mR/hr | ||
: 4. Determine that task performance is not p SAT I UNSAT allowable per normal controls. | * 2hr = 3800 mR 3b Determine anticipated dose from transit to p SAT I UNSAT and from the Main Steam chase STD: | ||
STD: Determines that total dose is greater than the annual 4000 mR administrative limit for radiation exposure per GAP-RPP-07 and the 5000 mR federal limit 5. Determines that emergency exposure PASS/ FAIL controls are required per CNG-EP-1.01-1014, STD: Evaluates the total step 5.1.A | 2 x Transit dose (To and From) 2*575mR = 1150mR 3c Determine anticipated dose from transit to p SAT I UNSAT the work area in the steam chase. | ||
are not declared pregnant Cue: If asked, neither worker meets any of | STD: | ||
previous emergency exposure have not received a planned special exposure. | Dose Rate *Time=Transit Dose 800mR/hr* (2min/60)=26. 7mR 3d Determine anticipated dose from transit from p SAT/ UNSAT the work area in the steam chase. STD: | ||
: 7. Determines EP-Form-All08 is required per p PASS/ FAIL step 5.1.E. STD: Determines EP-Form-All08 is required due to Cue: When the applicant determines EP- | Dose Rate *Time=Transit Dose 800mR/hr * (3min/60)=40mR 3e Determine the total dose for each worker p PASS/ FAIL from 3a through 3d. STD: | ||
Add 3a-3d = 5016.7mR NRC JPM SRO RC Page 7 of 10 March 2015 | |||
=;:r Exelon Generation | |||
Anywhere between 5.016Rem to 25 Rem with be accepted for full credit. Employer is not a critical component of this step. NRC JPM SRO RC Page 8 of 10 March 2015 | : 4. Determine that task performance is not p SAT I UNSAT allowable per normal controls. STD: Determines that total dose is greater than the annual 4000 mR administrative limit for radiation exposure per GAP-RPP-07 and the 5000 mR federal limit | ||
=:r-Exelon Generation | : 5. Determines that emergency exposure PASS/ FAIL controls are required per CNG-EP-1.01-1014, STD: Evaluates the total expected dose and recognizes step 5.1.A p that emergency exposure controls are required to raise the limit above 5 R for each individual per CNG-EP-1.01-1014 | ||
: 9. Completes EP-Form-All08 for technician | : 6. Verifies workers are allowed to receive p SAT/ UNSAT emergency exposure per step 5.1.C STD: Using currently identified workers verifies workers: | ||
are not declared pregnant workers Cue: If asked, neither worker meets any of have not received a the exclusion criteria. previous emergency exposure have not received a planned special exposure. | |||
Anywhere between 5.016Rem to 25 Rem with be accepted for full credit. Employer is not a critical component of this step. | : 7. Determines EP-Form-All08 is required per p PASS/ FAIL step 5.1.E. STD: Determines EP-Form-All08 is required due to anticipated exposure >SR Cue: When the applicant determines EP-Form-All08 is required, provide the form. | ||
: 8. Completes EP-Form-All08 for technician 1. p PASS/ FAIL STD: Completes section A of Note: Acceptable range of authorized EP-Form-All08 for technician 1. | |||
exposure: Anywhere between 5.016Rem to 25 Rem with be accepted for full credit. | |||
Employer is not a critical component of this step. | |||
NRC JPM SRO RC Page 8 of 10 March 2015 | |||
=:r-Exelon Generation | |||
: 9. Completes EP-Form-All08 for technician 2. p PASS/ FAIL STD: Completes section A of Note: Acceptable range of authorized EP-Form-AllOS for technician 2. | |||
exposure: Anywhere between 5.016Rem to 25 Rem with be accepted for full credit. | |||
Employer is not a critical component of this step. | |||
"You may stop here, you have met the termination criteria for this JPM" NRC JPM SRO RC Page 9 of 10 March 2015 | |||
Exelon Generation JPM Handout Given: | |||
* The plant is at 15% power. | * The plant is at 15% power. | ||
* A Site Area Emergency has been declared due to a steam line rupture with significant fuel damage. | * A Site Area Emergency has been declared due to a steam line rupture with significant fuel damage. | ||
* Entry is required into the MSIV Room to close the outboard MSIVs to prevent event escalation. | * Entry is required into the MSIV Room to close the outboard MSIVs to prevent event escalation. | ||
* Job conditions are as follows: | * Job conditions are as follows: | ||
o Two individuals are required to complete the job. o Each worker is expected to receive 575 mR in transit to the Main Steam line access door AND the same amount again while exiting the plant. o Each worker is expected to spend 2 minutes in an 800 mR/hr field in transit from the Main Steam line access door to the job site. o The job site is against the outer Containment Wall in a 1.9 R/hr field. o The job will take 2 hours at the job site with both workers working the full time. o Each worker is expected to spend 3 minutes in an 800 mR/hr field in transit from the job site to the Main Steam line access door. | o Two individuals are required to complete the job. | ||
* Two workers are briefed to complete the task. o Technician 1 -John Technician | o Each worker is expected to receive 575 mR in transit to the Main Steam line access door AND the same amount again while exiting the plant. | ||
-Maintenance | o Each worker is expected to spend 2 minutes in an 800 mR/hr field in transit from the Main Steam line access door to the job site. | ||
-SS # 123 | o The job site is against the outer Containment Wall in a 1.9 R/hr field. | ||
-SS# 987-65-4321 | o The job will take 2 hours at the job site with both workers working the full time. | ||
-TLD# 235699 | o Each worker is expected to spend 3 minutes in an 800 mR/hr field in transit from the job site to the Main Steam line access door. | ||
* During an initial entry under a modified RWP the workers received the following dose: o Technician 1 received 900 mR on his Electronic Dosimeter from his first entry, resulting in a total exposure of 1678 mR for the year. o Technician 2 received 600 mR on his Electronic Dosimeter from his first entry, resulting in a total exposure of 1399 mR for the year. | * Two workers are briefed to complete the task. | ||
o Technician 1 - John Technician - Maintenance - SS # 123 6789 - TLD # 145678 o Technician 2 - James Worker - Operations - SS# 987-65-4321 | |||
- TLD# 235699 | |||
* During an initial entry under a modified RWP the workers received the following dose: | |||
o Technician 1 received 900 mR on his Electronic Dosimeter from his first entry, resulting in a total exposure of 1678 mR for the year. | |||
o Technician 2 received 600 mR on his Electronic Dosimeter from his first entry, resulting in a total exposure of 1399 mR for the year. | |||
* The TSC has not been staffed and the RAC is in route to the site. | * The TSC has not been staffed and the RAC is in route to the site. | ||
* Emergency exposure controls have not been implemented. | * Emergency exposure controls have not been implemented. | ||
(Operators Name), Anticipate dose to be accumulated by each worker. Authorize work using the appropriate exposure limits to allow completion of the required task per CNG-EP-1.01-1014 and GAP-RPP-07. | (Operators Name), Anticipate dose to be accumulated by each worker. | ||
Page 10 of 10 March 2015 | Authorize work using the appropriate exposure limits to allow completion of the required task per CNG-EP-1.01-1014 and GAP-RPP-07. | ||
_.,, Exelon Generation Training Id: 2015 NRC SRO Admin EP Revision: | NRC JPM SRO RC Page 10 of 10 March 2015 | ||
0.0 | |||
Si Developed By 5/21/14 Validated By Pat O'Brien 8/19/2014 Facility Reviewer Greg Elkins b/11 la Approximate Duration: | _.,, Exelon Generation Training Id: 2015 NRC SRO Admin EP Revision: 0.0 | ||
20 minutes Documentation of Performance: | |||
==Title:== | |||
Classify Emergency Event and Perform Initial Notifications Approvals: | |||
Si Developed By 5/21/14 Validated By Pat O'Brien 8/19/2014 Facility Reviewer Greg Elkins b/11 la Approximate Duration: 20 minutes Documentation of Performance: | |||
Performer: | Performer: | ||
Evaluator: | Evaluator: | ||
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | ||
Evaluators Signature: | Evaluators Signature: Date: | ||
Date: NRC JPM SRO EP Page 1of9 March 2015 Exelon Generation References | NRC JPM SRO EP Page 1of9 March 2015 | ||
: 1. NUREG 1123, 2.4.41 (4.6) 2. EPIP-EPP-01 EAL Matrix 3. CNG-EP-1.01-1013, Emergency Classification and PAR 4. CNG-EP-1.01-1015, Emergency Notifications | |||
: 5. CNG-EP-1.01-1019, Site Emergency Operations | ~* Exelon Generation References | ||
: 6. EPMP-EPP-0101, Unit 1 Emergency Classification Technical Bases NRC JPM SRO EP Page 2 of 9 March 2015 | : 1. NUREG 1123, 2.4.41 (4.6) | ||
=:r-Exelon Generation Instructor Information A. JPM Information | : 2. EPIP-EPP-01 EAL Matrix | ||
: 1. Description | : 3. CNG-EP-1.01-1013, Emergency Classification and PAR | ||
: a. This JPM tests the senior operator's knowledge of emergency action thresholds by giving a series of plant conditions and requiring the operator to classify the event and complete a part 1 notification. | : 4. CNG-EP-1.01-1015, Emergency Notifications | ||
: 2. Task Information: | : 5. CNG-EP-1.01-1019, Site Emergency Operations | ||
: | : 6. EPMP-EPP-0101, Unit 1 Emergency Classification Technical Bases NRC JPM SRO EP Page 2 of 9 March 2015 | ||
=:r-Exelon Generation Instructor Information A. JPM Information | |||
: 1. Description | |||
: a. This JPM tests the senior operator's knowledge of emergency action thresholds by giving a series of plant conditions and requiring the operator to classify the event and complete a part 1 notification. | |||
: 2. Task Information: | |||
: a. NS-EPlOl-03005, Classify emergency events requiring emergency plan implementation. | |||
: b. K/A 2.4.41 (4.6), Knowledge of emergency action level thresholds and classifications. | : b. K/A 2.4.41 (4.6), Knowledge of emergency action level thresholds and classifications. | ||
Evaluation | : 3. Evaluation /Task Criteria Perform Classroom Yes No Yes | ||
/Task Criteria Perform Classroom Yes No Yes Recommended Start Location | : 4. Recommended Start Location | ||
: a. Training Classroom JPM Setup (if required) | : a. Training Classroom | ||
: a. Provide copy of EPIP-EPP-01, UNIT 1 EAL MATRIX b. Ensure sufficient copies of the SM/ED checklist packages are available. | : 5. JPM Setup (if required) | ||
NRC JPM SRO EP Page 3 of 9 March 2015 Exelon Generation B. Read Before Every JPM Performance | : a. Provide copy of EPIP-EPP-01, UNIT 1 EAL MATRIX | ||
: 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. | : b. Ensure sufficient copies of the SM/ED checklist packages are available. | ||
During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | NRC JPM SRO EP Page 3 of 9 March 2015 | ||
Exelon Generation B. Read Before Every JPM Performance | |||
: 1. For the performance of this JPM, I will act as all those you need to talk to. | |||
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | |||
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | ||
Repositioning of devices will be simulated by discussion and acknowledged by my cues. C. Read Before Each Evaluated JPM 1. This evaluated JPM is a measure of your ability to perform this task independently. | Repositioning of devices will be simulated by discussion and acknowledged by my cues. | ||
The CRS has determined that a verifier is not available and that additional verification will not be provided. | C. Read Before Each Evaluated JPM | ||
NRC JPM SRO EP Page 4 of 9 March 2015 | : 1. This evaluated JPM is a measure of your ability to perform this task independently. The CRS has determined that a verifier is not available and that additional verification will not be provided. | ||
NRC JPM SRO EP Page 4 of 9 March 2015 | |||
: 2. Unit 1 was operating at 100% power. 3. Unit 2 is operating at 100% power. 4. The following events have occurred at Unit 1: | |||
Exelon Generation Given: | |||
: 1. You are the Unit 1 Shift Manager. | |||
: 2. Unit 1 was operating at 100% power. | |||
: 3. Unit 2 is operating at 100% power. | |||
: 4. The following events have occurred at Unit 1: | |||
* EDG 103 was removed from service for corrective maintenance and will not be available for 12 hours. | * EDG 103 was removed from service for corrective maintenance and will not be available for 12 hours. | ||
* A loss of both offsite power lines has occurred. | * A loss of both offsite power lines has occurred. | ||
Line 455: | Line 603: | ||
* The ERO has not been activated. | * The ERO has not been activated. | ||
* Unit 1 is currently still in an operating condition. | * Unit 1 is currently still in an operating condition. | ||
Instructor | Instructor / Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), based on the above conditions, determine the event classification per CNG-EP-1.01-1013 and complete steps 1 through 1.3.2.A of EP-Chlst-MCROl, Shift Manager Checklist. This is a time critical task. | ||
/ Evaluator: | Time starts now. | ||
Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), based on the above conditions, determine the event classification per CNG-EP-1.01-1013 and complete steps 1 through 1.3.2.A of EP-Chlst-MCROl, Shift Manager Checklist. | *~.:~,1/~:~;:,~,F~f~*'.*** .."ACr*CODE'" | ||
This is a time critical task. Time starts now. | . : ;;>pt~t'NA. . | ||
. : | ,s~ - | ||
. Provide repeat back of initiating cue Cue: Acknowledge repeat back providing correction if necessary. | : 1. Provide repeat back of initiating cue SAT/ UNSAT p | ||
Obtain a copy of the reference procedure and review / utilize the correct section of the procedure. | Cue: Acknowledge repeat back providing STD: Proper communications correction if necessary. used. | ||
: 2. Obtain a copy of the reference procedure and SAT I UNSAT review / utilize the correct section of the STD: Shift Manager ERO forms procedure. | |||
obtained. EAL Flowchart p | |||
obtained. | |||
Note: Each SRO applicant will be provided with a partial Shift Manager ERO Guidebook and a copy of the EAL Flowchart. | Note: Each SRO applicant will be provided with a partial Shift Manager ERO Guidebook and a copy of the EAL Flowchart. | ||
NRC JPM SRO EP Page 5 of 9 March 2015 | |||
NRC JPM SRO EP Page 5 of 9 March 2015 | Exelon Generation ACT. CODE*** | ||
: 3. | P IS:l i-4Jt' .* | ||
(step 1.1.2) Call the Shift Communicator and Dose Assessors to the Control Rooms. (step 1.1.3) If entry is due to a security event, the concurrently perform the station specific procedure. | : 3. Print name and date on Shift Manager SAT/ UNSAT Checklist. | ||
Using CNG-EP-1.01-1013, classify the event. (step 1.2.2) Note: The classification, NOT the use of the references provided in the standard, is used for the pass/fail grading criteria. | (step 1.1.2) STD: Step 1.1.2 complete with applicant name and date. | ||
Cue: If applicant requests a peer check, respond that peer checks are not available. | : 4. Call the Shift Communicator and Dose SAT/ UNSAT Assessors to the Control Rooms. p (step 1.1.3) STD: Proper communications used | ||
Declare the event by announcing, "I am declaring an Alert, EAL SAl.1, at (time) due to only having 1 power source available to the emergency 4160V powerboards, and assuming the role as Emergency Director." | : 5. If entry is due to a security event, the p SAT I UNSAT concurrently perform the station specific procedure. STD: Determine there is no indication of a security threat. | ||
Notes: Similar announcements are acceptable provided all the information listed in step 1.2.2.B is announced. | : 6. Using CNG-EP-1.01-1013, classify the event. PASS I FAIL (step 1.2.2) | ||
The time difference must be 15 minutes or less. NRC JPM SRO EP Page 6 of 9 | STD: Determines Alert, SA1 .1 due to: | ||
Note: The classification, NOT the use of the | |||
* AC power capability to 4.16 references provided in the standard, is used kV emergency buses p reduced to a single power for the pass/fail grading criteria. | |||
source for > 15 min. | |||
AND Cue: If applicant requests a peer check, | |||
* ANY additional single respond that peer checks are not available. power source failure will result in a loss of all 4.16 kV emergency bus power. | |||
: 7. Declare the event by announcing, "I am p PASS/ FAIL declaring an Alert, EAL SAl.1, at (time) due to only having 1 power source available to STD: Event declared in the control room. Declaration the emergency 4160V powerboards, and occurred within 15 minutes of assuming the role as Emergency Director." JPM start time. | |||
Notes: Similar announcements are JPM Start Time_ _ __ | |||
acceptable provided all the information listed in step 1.2.2.B is announced. Declaration time_ _ __ | |||
The time difference must be 15 minutes or less. | |||
NRC JPM SRO EP Page 6 of 9 March 2015 | |||
=~Exelon Generation | |||
: 8. Determine if protective actions for onsite p SAT I UNSAT personnel are necessary using EP-Form-ALL12, Onsite Protective Measures Flowchart STD: Determine there is no need to perform protected area (step 1.2.3) evacuation and accountability. | |||
Note: EP-Form-ALL12 will advise to "Consider" implementing protected area evacuation, but does not require it. | |||
: 9. Announce or direct PA announcements, for p PASS I FAIL station personnel as necessary using EP-Form-ALL36. STD: Completes EP-Form-ALL36 per the attached key (step 1.2.4) with step (3) being the only critical step. | |||
Cue: When EP-Form-ALL36 is completed, inform the applicant another operator will make the PA announcement. | |||
: 10. Determine appropriate PAR per CNG-EP- SAT/ UNSAT 1.01-1013, Emergency Classification and PAR. STD: Determine no PARs for the Alert condition. | |||
(step 1.2.5) | |||
: 11. Complete ERONS notification Details Form, SAT I UNSAT EP-Form-ALL28 (step 1. 3 . 1 ) STD: Completes EP-Form-ALL28 per the attached key. | |||
Cue: When EP-Form-ALL28 is completed, inform the applicant the Shift Communicator with inform the ERO. | |||
NRC JPM SRO EP Page 7 of 9 March 2015 | |||
Generation | Exelon Generation | ||
~~~~!f.'rOtt | |||
)'."* | |||
P/ srNA' | |||
: 12. Complete station specific initial notification PASS/ FAIL form (Part 1) | |||
(step 1.3.2) STD: Completes EP-Form-ALL31 per the attached key with steps (3), (4), (5), (6), | |||
: 12. Complete station specific initial notification form (Part 1) (step 1.3.2) | and (7)being the only critical steps. | ||
Declaration time_ _ __ | |||
Note: The time difference must be 15 minutes or less. | |||
(6), and (7)being the only critical steps. Declaration time | Part 1 Notification Fact Sheet is complete: _ __ | ||
Your task is complete. | |||
NRC JPM SRO EP Page 8 of 9 March 2015 | Alert is declared and Part 1 notification is complete. | ||
: 2. Unit 1 was operating at 100% power. 3. Unit 2 is operating at 100% power. 4. The following events have occurred at Unit 1: | NRC JPM SRO EP Page 8 of 9 March 2015 | ||
Exelon Generation JPM Handout Given: | |||
: 1. You are the Unit 1 Shift Manager. | |||
: 2. Unit 1 was operating at 100% power. | |||
: 3. Unit 2 is operating at 100% power. | |||
: 4. The following events have occurred at Unit 1: | |||
* EOG 103 was removed from service for corrective maintenance and will not be available for 12 hours. | * EOG 103 was removed from service for corrective maintenance and will not be available for 12 hours. | ||
* A loss of both offsite power lines has occurred. | * A loss of both offsite power lines has occurred. | ||
Line 494: | Line 670: | ||
* Power control estimates several hours until an offsite power line can be restored. | * Power control estimates several hours until an offsite power line can be restored. | ||
* The ERO has not been activated. | * The ERO has not been activated. | ||
* Unit 1 is currently still in an operating condition. | * Unit 1 is currently still in an operating condition. | ||
{Operators Name), based on the above conditions, determine the event classification per CNG-EP-1.01-1013 and complete steps 1 through 1.3.2.A of EP-ChLst-MCROl, Shift Manager Checklist. | {Operators Name), based on the above conditions, determine the event classification per CNG-EP-1.01-1013 and complete steps 1 through 1.3.2.A of EP-ChLst-MCROl, Shift Manager Checklist. This is a time critical task. | ||
This is a time critical task. Time starts now. Emergency Meteorology Report Last 15 Minute Emergency Meteorology Report Data Data from Nine Mile Point Met System XX/XX/XXXX Time (Local): | Time starts now. | ||
XX:XX:XX Elevated Ground Wind Speed (Main) 40 (mph) 30' Wind Speed (Main) 35 (mph) Wind Dir From (Main) 45 (deg) 30' Wind Dir From (Main) 60 (deg) Delta Temperature | Emergency Meteorology Report Last 15 Minute Emergency Meteorology Report Data Data from Nine Mile Point Met System Date: XX/XX/XXXX Time (Local): XX:XX:XX Elevated Ground 200' Wind Speed (Main) 40 (mph) 30' Wind Speed (Main) 35 (mph) 200' Wind Dir From (Main) 45 (deg) 30' Wind Dir From (Main) 60 (deg) 200' Delta Temperature -1.56 (deg F) 100' Delta Temperature -0.81 (deg F) | ||
-1.56 (deg F) 100' Delta Temperature | Stability Class D Stability Class D 30' Air Temperature 80 (deg F) Precipitation (15 min) 0 (in) | ||
-0.81 (deg F) Stability Class D Stability Class D Air Temperature 80 (deg F) Precipitation (15 min) 0 (in) NRC JPM SRO EP Page 9 of 9 March 2015 | NRC JPM SRO EP Page 9 of 9 March 2015 | ||
=::'"Exelon Generation Training Id: 2015 NRC JPM S-1 Revision: | |||
0.0 | =::'"Exelon Generation Training Id: 2015 NRC JPM S-1 Revision: -0.0 | ||
15 minutes Documentation of Performance: | ==Title:== | ||
Place 11 Shutdown Cooling Loop in Service (Alternate Path) | |||
Approvals: | |||
Signature I Printed Name Developed By ~~ Paul Isham 03/17/14 Validated By Leigh Mason 8/20/14 Facility Reviewer Greg Elkins Approximate Duration: 15 minutes Documentation of Performance: | |||
Performer: | Performer: | ||
Evaluator: | Evaluator: | ||
Start Time: Stop Time: Completion Time Grade: Pass I Fail Comments: | Start Time: Stop Time: Completion Time Grade: Pass I Fail Comments: | ||
Evaluators Signature: | Evaluators Signature: Date: | ||
Date: NRC 2015 JPM 5-1 Page 1of13 | NRC 2015 JPM 5-1 Page 1of13 March 2015 | ||
: 1. Nl-OP-4, Shutdown Cooling System 2. NUREG 1123 K/A 205000, A4.01, (3.7/3.7) | |||
NRC 2015 JPM S-1 Page 2 of 13 March 2015 | References | ||
: 1. Nl-OP-4, Shutdown Cooling System | |||
: 2. NUREG 1123 K/A 205000, A4.01, (3.7/3.7) | |||
NRC 2015 JPM S-1 Page 2 of 13 March 2015 | |||
=~Exelon Generationoo Instructor Information A. JPM Information | |||
: 1. Description | |||
: a. This JPM tests the operator's ability to operate the SDC system. The operator will attempt to put SDC system 11 in service. | |||
: b. This JPM is considered alternate path because shortly after a SDC pump is started, it will trip. The operator will be expected to make a recommendation to place 12 SDC loop in service. | |||
: 2. Task Information: | |||
: a. Nl-205000-01002 | |||
: b. K/A 205000, A4.01, (3.7/3.7) | |||
: 3. Evaluation/ Task Criteria Perform Simulator No Yes Yes | |||
: 4. Recommended Start Location | |||
: a. Unit 1 Simulator NRC 2015 JPM S-1 Page 3 of 13 March 2015 | |||
=:rExelon Generation | |||
: 5. Simulator Setup (if required) | |||
: a. Initialize Simulator to IC-161. | |||
: b. Verify SOC temperature recorder on. | |||
: c. Update 70-49, 70-54, and 70-58 status to "4". | |||
: d. Verify recirc suction temperature is displayed (computer point A427). | |||
: e. Verify SOC is removed from service (TCVs closed, pumps secured, IVs closed, inlet BVs closed). | |||
: f. Verify SOC Pump 13 in PTL and yellow tagged | |||
: g. Verify SOC 13 suction valve is yellow tagged (38-05) | |||
: h. Verify Malfunction SCOlC inserted | |||
=:rExelon Generation | : i. Verify Malfunction SCOlA on TRG 1 with 60 second TD | ||
: 5 | : j. Verify TRG 1 condition is "ZDSCPSTR(l)==l" | ||
Initialize Simulator to IC-161. Verify SOC temperature recorder on. Update 70-49, 70-54, and 70-58 status to "4". Verify recirc suction temperature is displayed (computer point A427). e. Verify SOC is removed from service (TCVs closed, pumps secured, IVs closed, inlet BVs closed). | : k. Verify the following remotes are preset: | ||
: f | |||
* SCOl = close | * SCOl = close | ||
* SC02 = installed | * SC02 = installed | ||
* SC03 = close I. Verify remotes SC04A(B)(C) | * SC03 = close I. Verify remotes SC04A(B)(C) = 100% are preset. | ||
= 100% are preset. 6. JPM Setup (if required) | : 6. JPM Setup (if required) | ||
: a. Nl-OP-4, E.3.1 marked complete. | : a. Nl-OP-4, E.3.1 marked complete. | ||
B. Read Before Every JPM Performance | B. Read Before Every JPM Performance | ||
: 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. | : 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues. | ||
During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | C. Read Before Each Evaluated JPM | ||
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | : 1. This evaluated JPM is a measure of your ability to perform this task independently. | ||
Repositioning of devices will be simulated by discussion and acknowledged by my cues. C. Read Before Each Evaluated JPM 1. This evaluated JPM is a measure of your ability to perform this task independently. | |||
The CRS has determined that a verifier is not available and that additional verification will not be provided. | The CRS has determined that a verifier is not available and that additional verification will not be provided. | ||
NRC 2015 JPM S-1 Page 4 of 13 March 2015 | NRC 2015 JPM S-1 Page 4 of 13 March 2015 | ||
Generation | =~Exelon Generation Given: | ||
* The Reactor is shutdown with all rods in. | * The Reactor is shutdown with all rods in. | ||
* Reactor pressure is less than 120 psig. | * Reactor pressure is less than 120 psig. | ||
Line 548: | Line 738: | ||
* SOC pump 13 is OOS for maintenance. | * SOC pump 13 is OOS for maintenance. | ||
* Reactor water level is being monitored by another operator. | * Reactor water level is being monitored by another operator. | ||
Evaluator: | Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), place Shutdown Cooling loop 11 in service per Nl-OP-4 starting at step E.3.2. | ||
Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), place Shutdown Cooling loop 11 in service per OP-4 starting at step E.3.2. Provide repeat back of initiating cue SAT I UNSAT | : 1. Provide repeat back of initiating cue SAT I UNSAT STD: Proper p | ||
& limitations | Cue: Acknowledge repeat back providing communications used correction if necessary | ||
: 2. Obtain a copy of the reference procedure and SAT/ UNSAT review / utilize the correct section of the procedure p STD: Nl-OP-4 obtained, precautions & limitations reviewed, & section E.3.0 referenced | |||
& section E.3.0 referenced Open the following valves: (Step 3.2) NRC 2015 JPM S-1 Page 5 of 13 March 2015 | : 3. Open the following valves: (Step 3.2) | ||
NRC 2015 JPM S-1 Page 5 of 13 March 2015 | |||
=~Exelon Generation 3a. 38-03, SDC VALVE 11 PUMP SUCTION PASS/ FAIL (Step E.3.2) p STD: Opens 38-03 by rotating control switch CW to OPEN 3b. 38-04, SDC VALVE 12 PUMP SUCTION PASS/ FAIL (Step E.3.2) p STD: Opens 38-04 by rotating control switch CW to OPEN 3c. 38-05, SDC VALVE 13 PUMP SUCTION SAT I UNSAT Note: Candidate may request a Technical STD: Recognizes 38-05 Procedure Step Deletion be processed before is tagged closed proceeding. p Cue: If Technical Procedure Step Deletion is requested, inform the Operator that the step has been deleted and to proceed. | |||
: 4. Fill AND vent the SDC System by performing SAT/ UNSAT the following: (Step 3.3) p STD: Determines fill and vent not required due to initial conditions | |||
: 5. Verify all rods inserted UNLESS directed by SAT/ UNSAT EOPs (Step 3.4) | |||
STD: Determines all rods p | |||
are inserted per initial conditions or simulator setup NRC 2015 JPM S-1 Page 6 of 13 March 2015 | |||
Exelon Generatione< | |||
: 6. IF SDC IV fuses AND breakers have NOT SAT/ UNSAT been installed, THEN perform the following: | |||
(Step 3.5) STD: Determines SDC IV p fuses and breakers have been installed per initial conditions or simulator setup | |||
: 7. Open IV-38-02, SDC SYSTEM IN IV 12 PASS/ FAIL (OUTSIDE) (Step 3.6) p STD: Opens 38-02 by rotating control switch CW to OPEN | |||
: 8. WHEN Reactor pressure is less than 120 SAT I UNSAT psig, un-isolate Shutdown Cooling System as follows: (Step 3. 7) p STD: Determines Reactor pressure is less than 120 psig per initial conditions or simulator setup 8a Monitor Reactor vessel level SAT/ UNSAT (Step 3.7.1) p STD: Determines another operator is monitoring Reactor water level per initial conditions 8b IF Reactor vessel level begins to go down SAT/ UNSAT WHILE un-isolating Shutdown Cooling System, THEN isolate Shutdown Cooling p STD: Determines Reactor System AND determine cause of reduction in water level is stable in Reactor Vessel level subsequent steps 8c Open 38-13, SDC SYSTEM OUT IV 1 PASS/ FAIL (INSIDE) (Step 3. 7 .3) p STD: Opens 38-13 by rotating control switch CW to OPEN NRC 2015 JPM S-1 Page 7 of 13 March 2015 | |||
: 6. IF SDC IV fuses AND breakers have NOT SAT/ UNSAT been installed, THEN perform the following: | |||
(Step 3.5) STD: Determines SDC IV p fuses and breakers have been installed per initial conditions or simulator setup 7. Open IV-38-02, SDC SYSTEM IN IV 12 PASS/ FAIL (OUTSIDE) | |||
(Step 3.6) p STD: Opens 38-02 by rotating control switch CW to OPEN 8. WHEN Reactor pressure is less than 120 SAT I UNSAT psig, un-isolate Shutdown Cooling System as follows: | |||
(Step 3. 7) p STD: Determines Reactor pressure is less than 120 psig per initial conditions or simulator setup 8a Monitor Reactor vessel level SAT/ UNSAT (Step 3.7.1) p STD: Determines another operator is monitoring Reactor water level per initial conditions 8b IF Reactor vessel level begins to go down SAT/ UNSAT WHILE un-isolating Shutdown Cooling System, THEN isolate Shutdown Cooling p STD: Determines Reactor System AND determine cause of reduction in water level is stable in Reactor Vessel level subsequent steps 8c Open 38-13, SDC SYSTEM OUT IV 1 PASS/ FAIL (INSIDE) | |||
(Step 3. 7 .3) p STD: Opens 38-13 by rotating control switch CW to OPEN NRC 2015 JPM S-1 Page 7 of 13 March 2015 | |||
Generation 8d Open 38-01, SDC SYTEM IN IV 11 (INSIDE) | =~Exelon Generation 8d Open 38-01, SDC SYTEM IN IV 11 (INSIDE) PASS/ FAIL (Step 3.7.4) p STD: Opens 38-01 by rotating control switch CW to OPEN | ||
PASS/ FAIL (Step 3.7.4) p STD: Opens 38-01 by rotating control switch CW to OPEN 9. Vent Shutdown Cooling pumps using the SAT/ UNSAT following valves: (step 3.8) p STD: Determines venting not required due to initial conditions | : 9. Vent Shutdown Cooling pumps using the SAT/ UNSAT following valves: (step 3.8) p STD: Determines venting not required due to initial conditions | ||
: 10. Vent heat exchangers using the following SAT I UNSAT valves: (Step 3.9) p STD: Determines venting not required due to initial conditions | : 10. Vent heat exchangers using the following SAT I UNSAT valves: (Step 3.9) p STD: Determines venting not required due to initial conditions | ||
: 11. Verify open the following valves: SAT I UNSAT (Step 3.10) STD: Observes green | : 11. Verify open the following valves: SAT I UNSAT (Step 3.10) | ||
* 38-134, SDC PUMP RECIRC VALVE 11 light off, red light on for all | STD: Observes green | ||
* 38-134, SDC PUMP RECIRC VALVE 11 light off, red light on for all | |||
* 38-131, SDC PUMP RECIRC VALVE 12 | * 38-131, SDC PUMP RECIRC VALVE 12 | ||
* 38-128, SDC PUMP RECIRC VALVE 13 Note: Candidate may disregard 38-128 because the associated pump is tagged out. 12. Start 11 SDC Pump as follows: | * 38-128, SDC PUMP RECIRC VALVE 13 Note: Candidate may disregard 38-128 because the associated pump is tagged out. | ||
(Step 3.11) Note: Pump Seal was NOT discovered de-staged (Step 3.11.1) NRC 2015 JPM S-1 Page 8 of 13 March 2015 | : 12. Start 11 SDC Pump as follows: | ||
(Step 3.11) | |||
Note: Pump Seal was NOT discovered de-staged (Step 3.11.1) | |||
NRC 2015 JPM S-1 Page 8 of 13 March 2015 | |||
Generation | Exelon Generation 12a Verify SD COOLING TCV 11 manual controller SAT/ UNSAT selected for zero output demand (Step 3.11.2) p STD: Observes SD COOLING TCV 11 manual controller selected for zero output demand 12b Using local indication, verify closed FCV SAT/ UNSAT 09, SDC 11 FCV (step 3.11.2.b) p STD: Dispatches Role Play: Acknowledge direction and operator to verify closed report the appropriate loop FCV is closed. FCV-38-09 Role Plays: For each of these dPIS steps, acknowledge direction and then report the appropriate valve position. Candidate may just provide direction to perform actions by procedure step number. | ||
: | 12c Verify closed Gl, Instrument HP Blocking SAT I UNSAT Valve - SDC Loop 11 (step 3.11.2.c) p STD: Dispatches operator to verify closed Gl 12d Verify open G3, Instrument Equalizing Valve SAT/ UNSAT | ||
- SDC Loop 11 (step 3.11.2.d) p STD: Dispatches operator to verify open G3 12e Verify closed G2, Instrument LP Blocking SAT/ UNSAT Valve - SDC Loop 11 (step 3.11.2.e) p STD: Dispatches operator to verify closed G2 12f Place 11 SDC Pump Control Switch in START PASS/ FAIL UNTIL 11 SDC PUMP running light is lit (step 3.11.2.f) p STD: Starts SDC pump 11 by rotating control switch CW to START NRC 2015 JPM S-1 Page 9 of 13 March 2015 | |||
March 2015 | |||
Generation | =~Exelon Generation 12g Open G2, Instrument LP Blocking Valve - SAT/ UNSAT SDC Loop 11 p (step 3.11.2.g) STD: Dispatches operator to open G2 12h Close G3, Instrument Equalizing Valve - SDC SAT/ UNSAT Loop 11 p (step 3.11.2.h) STD: Dispatches operator to close G3 12i Open Gl, Instrument HP Blocking Valve - SAT/ UNSAT SDC Loop 11 p (step 3.11.2.i) STD: Dispatches operator to open Gl | ||
: 14. Start 12 SDC Pump as follows: | : 13. Open respective SD Cooling TCV PASS I FAIL I NA approximately 10% for selected SDC Loop: | ||
(Step 3.11) Note: Pump Seal was NOT discovered de-staged (Step 3.11.1) 14a Verify SD COOLING TCV 12 manual controller SAT/ UNSAT selected for zero output demand | STD: Opens 38-09 by | ||
14c Place 12 SDC Pump Control Switch in START PASS/ FAIL UNTIL 12 SOC PUMP running light is lit (Step 3.11.2.o) p STD: Starts SOC pump 12 by rotating control switch CW to START Role Plays: When directed to operate valves in steps 3.11.2.p, q, and r, report the valves have been repositioned as directed. | * 38-09, SD COOLING TCV 11 rotating knurled knob CW NOTE: 1 minute after 11 SDC pump in p service, verify tripped 11 SDC pump (event Note: Step may be NA if trigger). Alarm K3-1-1, SDC Pump 11 trip, pump trips prior to comes in on the pump trip. The alarm executing. | ||
: 15. Open respective SD Cooling TCV PASS/ FAIL approximately 10% for selected SDC Loop: p STD: Opens 38-10 by 38-10, SD COOLING TCV 12 rotating knurled knob CW (step 3.11.3) NRC 2015 JPM S-1 Page 11of13 March 2015 Exelon Generation | response procedure gives direction to start another pump. | ||
: 16. If reactor water flashing occurs in SDC SAT I UNSAT System, reduce reactor water flow via selected SDC cooling TCV and maximize | Cue: If applicant does not make a recommendation to place another SDC pump in service, ask "What would you recommend?". | ||
: 17. Adjust SDC COOLING TCV 12 for gradual SAT I UNSAT warmup of the system. STD: Rotate knob on NOTE: Operator will monitor temperatures controller 38-10 CW or on panel recorder. | Role Play: If candidate asks about normalizing SDC loop 11, tell them to leave SDC loop 11 as is. | ||
CCW as required for a gradual warmup as NOTE: Operator may choose not to make p indicated on 38-136B. | NRC 2015 JPM S-1 Page 10 of 13 March 2015 | ||
any further adjustments based on the rate at which the loop is warming up with 38-10 10% open. Cue: Tell operator no further adjustments in the system are required. | |||
: 18. Inform SM SDC Loop 12 in service SAT/ UNSAT p Cue: Acknowledge report Cue: Your task is complete. | =~Exelon Generation | ||
: 14. Start 12 SDC Pump as follows: | |||
(Step 3.11) | |||
Note: Pump Seal was NOT discovered de-staged (Step 3.11.1) 14a Verify SD COOLING TCV 12 manual controller SAT/ UNSAT selected for zero output demand STD: Observes SD p | |||
COOLING TCV 12 manual controller selected for zero output demand 14b Using local indication, verify closed FCV SAT I UNSAT 10, SOC 12 FCV p STD: Dispatches Role Play: Acknowledge direction and operator to verify closed report the appropriate loop FCV is closed. FCV-38-10 Role Plays: When directed to operate valves in steps 3.11.2.1, m, and n, report the valves have been repositioned as directed. | |||
14c Place 12 SDC Pump Control Switch in START PASS/ FAIL UNTIL 12 SOC PUMP running light is lit (Step 3.11.2.o) p STD: Starts SOC pump 12 by rotating control switch CW to START Role Plays: When directed to operate valves in steps 3.11.2.p, q, and r, report the valves have been repositioned as directed. | |||
: 15. Open respective SD Cooling TCV PASS/ FAIL approximately 10% for selected SDC Loop: | |||
p STD: Opens 38-10 by 38-10, SD COOLING TCV 12 rotating knurled knob CW (step 3.11.3) | |||
NRC 2015 JPM S-1 Page 11of13 March 2015 | |||
Exelon Generation | |||
: 16. If reactor water flashing occurs in SDC SAT I UNSAT System, reduce reactor water flow via selected SDC cooling TCV and maximize STD: Pump amp p | |||
RBCLC cooling water flow. indicator observed as steady. | |||
Cue: No flashing observed. | |||
: 17. Adjust SDC COOLING TCV 12 for gradual SAT I UNSAT warmup of the system. | |||
STD: Rotate knob on NOTE: Operator will monitor temperatures controller 38-10 CW or on panel recorder. CCW as required for a gradual warmup as NOTE: Operator may choose not to make p indicated on 38-136B. | |||
any further adjustments based on the rate at which the loop is warming up with 38-10 10% open. | |||
Cue: Tell operator no further adjustments in the system are required. | |||
: 18. Inform SM SDC Loop 12 in service SAT/ UNSAT p | |||
Cue: Acknowledge report Cue: Your task is complete. | |||
Shutdown Cooling Loop 12 placed in service. | Shutdown Cooling Loop 12 placed in service. | ||
NRC 2015 JPM S-1 Page 12 of 13 March 2015 Exelon Generation | NRC 2015 JPM S-1 Page 12 of 13 March 2015 | ||
~* Exelon Generation JPM Handout Given: | |||
* The Reactor is shutdown with all rods in. | * The Reactor is shutdown with all rods in. | ||
* Reactor pressure is less than 120 psig. | * Reactor pressure is less than 120 psig. | ||
Line 603: | Line 814: | ||
* SDC pump 13 is OOS for maintenance. | * SDC pump 13 is OOS for maintenance. | ||
* Reactor water level is being monitored by another operator. | * Reactor water level is being monitored by another operator. | ||
Evaluator: | Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), place Shutdown Cooling loop 11 in service per Nl-OP-4 starting at step E.3.2. | ||
Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), place Shutdown Cooling loop 11 in service per OP-4 starting at step E.3.2. Page 13 of 13 March 2015 | NRC 2015 JPM S-1 Page 13 of 13 March 2015 | ||
=~Exelon Generation Training Id: 2015 NRC JPM S-2 Revision: 0.0 | |||
==Title:== | |||
Vent the Drywell Prior to Personnel Entry <212F Per Nl-OP-9 Approvals: | |||
Developed By Validated By | ~_aJ:ure I Printed Name Developed By ~/~~aullsham 03/17/14 Validated By Pat O'Brien 8/20/14 Facility Reviewer Approximate Duration: 15 minutes Documentation of Performance: | ||
15 minutes Documentation of Performance: | |||
Performer: | Performer: | ||
Evaluator: | Evaluator: | ||
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | ||
Evaluators Signature: | Evaluators Signature: Date: | ||
Date: NRC 2015 JPM S-2 Page 1of9 | NRC 2015 JPM S-2 Page 1of9 March 2015 | ||
; Exelon Generation References | |||
: 1. Nl-OP-9, N2 Inerting and H2-02 Monitoring Systems 2. NUREG 1123 K/A 223001, A4.03, (3.4/3.4) | ; Exelon Generation References | ||
NRC 2015 JPM S-2 Page 2 of 9 March 2015 Exelon Generation Instructor Information A. JPM Information | : 1. Nl-OP-9, N2 Inerting and H2-02 Monitoring Systems | ||
: 1. Description | : 2. NUREG 1123 K/A 223001, A4.03, (3.4/3.4) | ||
: a. This JPM tests the operator's ability to locate and operate containment air dilution valves for inerting and de-inerting the containment. | NRC 2015 JPM S-2 Page 2 of 9 March 2015 | ||
The operator will vent the drywell with the reactor <212F. b. This JPM is NOT considered alternate path. 2. Task Information: | |||
: a. Nl-223003-01004 | Exelon Generation Instructor Information A. JPM Information | ||
: b. K/A 223001, A4.03, (3.4/3.4) | : 1. Description | ||
: 3. Evaluation/ | : a. This JPM tests the operator's ability to locate and operate containment air dilution valves for inerting and de-inerting the containment. The operator will vent the drywell with the reactor <212F. | ||
Task Criteria Perform Simulator No No Yes 4. Recommended Start Location | : b. This JPM is NOT considered alternate path. | ||
: a. Unit 1 Simulator NRC 2015 JPM S-2 Page 3 of 9 March 2015 Exelon | : 2. Task Information: | ||
: 5. Simulator Setup (if required) | : a. Nl-223003-01004 | ||
: a. The reactor is in a shutdown condition. | : b. K/A 223001, A4.03, (3.4/3.4) | ||
: b. Initialize simulator to IC-161. c. Verify remote PCOS is inserted with valves open. d. Verify some positive pressure in the drywell. | : 3. Evaluation/ Task Criteria Perform Simulator No No Yes | ||
: 6. JPM Setup (if required) | : 4. Recommended Start Location | ||
: a. Unit 1 Simulator NRC 2015 JPM S-2 Page 3 of 9 March 2015 | |||
~* Exelon Generation~ | |||
: 5. Simulator Setup (if required) | |||
: a. The reactor is in a shutdown condition. | |||
: b. Initialize simulator to IC-161. | |||
: c. Verify remote PCOS is inserted with valves open. | |||
: d. Verify some positive pressure in the drywell. | |||
: 6. JPM Setup (if required) | |||
: a. Nl-OP-9 marked up through G.2.6.2. | : a. Nl-OP-9 marked up through G.2.6.2. | ||
B. Read Before Every JPM Performance | B. Read Before Every JPM Performance | ||
: 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. | : 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues. | ||
During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | : c. Read Before Each Evaluated JPM | ||
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | : 1. This evaluated JPM is a measure of your ability to perform this task independently. | ||
Repositioning of devices will be simulated by discussion and acknowledged by my cues. c. Read Before Each Evaluated JPM 1. This evaluated JPM is a measure of your ability to perform this task independently. | |||
The CRS has determined that a verifier is not available and that additional verification will not be provided. | The CRS has determined that a verifier is not available and that additional verification will not be provided. | ||
NRC 2015 JPM S-2 Page 4 of 9 March 2015 | NRC 2015 JPM S-2 Page 4 of 9 March 2015 | ||
_..,, Exelon Generation | |||
_..,, Exelon Generation Given: | |||
* The plant is shutdown, | * The plant is shutdown, <212°F. | ||
<212°F. | |||
* The Operations Manager has determined a complete de-inert to 19.5% Oxygen is necessary. | * The Operations Manager has determined a complete de-inert to 19.5% Oxygen is necessary. | ||
* Nl-OP-9 is completed through Step G.2.6.2. | * Nl-OP-9 is completed through Step G.2.6.2. | ||
Evaluator: | Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), vent the Drywell in accordance with Nl-OP-9, starting at step G.2.6.3. Secure venting when Drywell pressure is below 0 psig. | ||
Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), vent the Drywell in accordance with Nl-OP-9, starting at step G.2.6.3. | : 1. Provide repeat back of initiating cue SAT/ UNSAT STD: Proper p | ||
Secure venting when Drywell pressure is below 0 psig. Provide repeat back of initiating cue SAT/ UNSAT | Cue: Acknowledge repeat back providing communications used correction if necessary | ||
: 2. Obtain a copy of the reference procedure and SAT I UNSAT review / utilize the correct section of the procedure p STD: Nl-OP-9 obtained, precautions and limitation reviewed, section G.2.0 referenced | |||
: 3. Open the following valves: (Step 2.6) 3a. 201-10, DW AIR VENT & PURGE ISOLATION PASS/ FAIL VALVE 11 p STD: Rotates 201-10 control switch CW NRC 2015 JPM S-2 Page 5 of 9 March 2015 | |||
=~Exelon Generation 3b. 201-08, TOR AIR VENT & PURGE ISOLATION PASS/ FAIL VALVE 11 p STD: Rotates 201-08 control switch CW 3c. 201-32, DW N2 VENT & PURGE ISOLATION PASS/ FAIL VALVE 11 P STD: Rotates 201-32 control switch CW 3d. 201-16, TORUS N2 VENT & PURGE PASS/ FAIL ISOLATION VALVE 11 P STD: Rotates 201-16 control switch CW | |||
: 4. Applicant should determine from initial SAT I UNSAT conditions, a full de-inert is required for personnel entry to the Drywell and should STD: Determines 19.5% | |||
select "Approximately 19.5%". p oxygen per the initial (Step 2. 7) conditions. | |||
Note: Step 2.8 is N/A | |||
: 5. Notify Chemistry that a Drywell purge is SAT/ UNSAT about to commence. | |||
P STD: Proper communications used | |||
: 6. Start 201-35, DRYWELL & TORUS VENT & PASS/ FAIL PURGE (Step 2.10) p STD: Rotates 201-35 control switch CW NRC 2015 JPM S-2 Page 6 of 9 March 2015 | |||
Exelon Generation | |||
: 7. Verify open the following valves: (Step 2.11) SAT/ UNSAT | |||
* 201-21, DW & TOR VENT & PURGE FAN STD: Observes red light p | |||
INLET BV on, green light off for | |||
* 201-22, DW & TOR VENT & PURGE FAN both OUTLET BV | |||
: 8. Throttle open 201-31, DW N2 VENT & PURGE PASS I FAIL ISOLATION VALVE 12 (Step 2.12) STD: Rotates 201-31 p | |||
control switch CW Sa. SAT/ UNSAT STD: Throttles 201-31 by using pull-to-stop feature of control switch | |||
: 9. Throttle open 201-17, TORUS N2 VENT & PASS/ FAIL PURGE ISOLATION VALVE 12 (Step 2.13) STD: Rotates 201-17 p | |||
control switch CW Cue: After 201-17 is opened, report drywell and torus pressure is below 0 psig for purposes of this JPM (time compression used). | |||
9a. SAT I UNSAT STD: Throttles 201-17 by using pull-to-stop feature of control switch NRC 2015 JPM S-2 Page 7 of 9 March 2015 | |||
Exelon Generation | |||
: 10. When drywell and Torus pressures drops SAT I UNSAT BELOW 0 psig, open the following valves: | |||
P STD: Continues the JPM based on examiner cue. | |||
lOa 201-09, DW AIR VENT & PURGE ISOLATION PASS/ FAIL VALVE 12 P STD: Rotates 201-09 control switch CW lOb 201-07, TOR AIR VENT & PURGE ISOLATION PASS/ FAIL VALVE 12 STD: Rotates 201-07 p | |||
control switch CW Cue: Another operator will complete this procedure. | |||
: 10. When drywell and Torus pressures drops BELOW 0 psig, open the following valves: lOa 201-09, DW AIR VENT & PURGE ISOLATION VALVE 12 lOb 201-07, TOR AIR VENT & PURGE ISOLATION VALVE 12 Cue: Another operator will complete this procedure. | |||
Cue: Your task is complete. | Cue: Your task is complete. | ||
Drywell vented to atmospheric pressure in accordance with Nl-OP-9. | |||
NRC 2015 JPM S-2 Page 8 of 9 March 2015 Exelon Generation | NRC 2015 JPM S-2 Page 8 of 9 March 2015 | ||
* The plant is shutdown, | |||
<212°F. | Exelon Generation JPM Handout Given: | ||
* The plant is shutdown, <212°F. | |||
* The Operations Manager has determined a complete de-inert to 19.5% Oxygen is necessary. | * The Operations Manager has determined a complete de-inert to 19.5% Oxygen is necessary. | ||
* Nl-OP-9 is completed through Step G.2.6.2. | * Nl-OP-9 is completed through Step G.2.6.2. | ||
(Operators Name), vent the Drywell in accordance with Nl-OP-9, starting at step G.2.6.3. | (Operators Name), vent the Drywell in accordance with Nl-OP-9, starting at step G.2.6.3. Secure venting when Drywell pressure is below O psig. | ||
Secure venting when Drywell pressure is below O psig. Page 9 of 9 March 2015 | NRC 2015 JPM S-2 Page 9 of 9 March 2015 | ||
=~Exelon Generation Training Id: 2015 NRC JPM S-3 Revision: 0.0 | |||
==Title:== | |||
MSIV Stroke Test and Limit Switch Test (N1-ST-Q26) | |||
Approvals: | Approvals: | ||
Signature I Printed Name Developed By /'J/ Paul Isham 03/17/14 Validated By Pat O'Brien 8/20/14 Facility Reviewer 15 minutes Documentation of Performance: | Signature I Printed Name Developed By &~~ /'J/ &-~ Paul Isham 03/17/14 Validated By Pat O'Brien 8/20/14 Facility Reviewer 15 minutes Documentation of Performance: | ||
Performer: | Performer: | ||
Evaluator: | Evaluator: | ||
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | ||
Evaluators Signature: | Evaluators Signature: ---------- | ||
---------- | Date: | ||
Date: NRC 2015 JPM S-3 Page 1of10 March 2015 Exelon Generation References | NRC 2015 JPM S-3 Page 1of10 March 2015 | ||
: 1. Nl-ST-Q26 | |||
Exelon Generation References | |||
: 1. Nl-ST-Q26 | |||
: 2. NUREG 1123 K/A 239001 A4.01, (4.2/4.1) | : 2. NUREG 1123 K/A 239001 A4.01, (4.2/4.1) | ||
NRC 2015 JPM 5-3 Page 2 of 10 March 2015 | NRC 2015 JPM 5-3 Page 2 of 10 March 2015 | ||
=:rExelon Generation Instructor Information A. JPM Information | |||
: 1. Description | =:rExelon Generation Instructor Information A. JPM Information | ||
: a. This JPM tests the operator's ability to operate MSIV controls for a surveillance test and verify proper indications. | : 1. Description | ||
: b. This JPM is NOT considered alternate path. 2. Task Information: | : a. This JPM tests the operator's ability to operate MSIV controls for a surveillance test and verify proper indications. | ||
: a. Nl-239001-01026 | : b. This JPM is NOT considered alternate path. | ||
: b. K/A 239001 A4.01, (4.2/4.1) | : 2. Task Information: | ||
: 3. Evaluation I Task Criteria Perform Simulator No No Yes 4. Recommended Start Location | : a. Nl-239001-01026 | ||
: a. Unit 1 Simulator NRC 2015 JPM S-3 Page 3 of 10 March 2015 Exelon Generation | : b. K/A 239001 A4.01, (4.2/4.1) | ||
: 5. Simulator Setup (if required) | : 3. Evaluation I Task Criteria Perform Simulator No No Yes | ||
: a. The reactor is in an operating condition | : 4. Recommended Start Location | ||
: b. Initialize simulator to IC 162 6. JPM Setup (if required) | : a. Unit 1 Simulator NRC 2015 JPM S-3 Page 3 of 10 March 2015 | ||
Exelon Generation | |||
: 5. Simulator Setup (if required) | |||
: a. The reactor is in an operating condition | |||
: b. Initialize simulator to IC 162 | |||
: 6. JPM Setup (if required) | |||
: a. Section 7, prerequisites, and section 8.1 marked complete. | : a. Section 7, prerequisites, and section 8.1 marked complete. | ||
B. Read Before Every JPM Performance | B. Read Before Every JPM Performance | ||
: 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. | : 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues. | ||
During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | C. Read Before Each Evaluated JPM | ||
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | : 1. This evaluated JPM is a measure of your ability to perform this task independently. | ||
Repositioning of devices will be simulated by discussion and acknowledged by my cues. C. Read Before Each Evaluated JPM 1. This evaluated JPM is a measure of your ability to perform this task independently. | |||
The CRS has determined that a verifier is not available and that additional verification will not be provided. | The CRS has determined that a verifier is not available and that additional verification will not be provided. | ||
NRC 2015 JPM S-3 Page 4 of 10 March 2015 Exelon Generation Given: | NRC 2015 JPM S-3 Page 4 of 10 March 2015 | ||
Exelon Generation Given: | |||
* The plant is operating at 100% power. | * The plant is operating at 100% power. | ||
* All prerequisites for N1-ST-Q26 are complete. | * All prerequisites for N1-ST-Q26 are complete. | ||
* Section 8.1 has been completed. | * Section 8.1 has been completed. | ||
Evaluator: | Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), test Main Steam Line Isolation Valve 112 in accordance with N1-ST-Q26, Section 8.2. | ||
Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), test Main Steam Line Isolation Valve 112 in accordance with N1-ST-Q26, Section 8.2. 1. | ';'~;J,;>:f;:',~-1:QRi*), | ||
: 3. Prepare to initiate a Half-Scram on CHANNEL 11: (Step 8.2.1) 3a. Verify NO RPS Half-Scram signals exist 3b. Notify CRO that the following steps will initiate a Half-Scram NRC 2015 JPM S-3 Page 5 of 10 | ~ :':<'."' :* | ||
'~J :,}* ,, | |||
: 1. Provide repeat back of initiating cue SAT/ UNSAT p STD: Proper Cue: Acknowledge repeat back providing communications used correction if necessary | |||
: 2. Obtain a copy of the reference procedure and SAT I UNSAT review/ utilize the correct section of the procedure p STD: N 1-ST-Q26 obtained, precautions & | |||
limitations reviewed | |||
: 3. Prepare to initiate a Half-Scram on CHANNEL 11: (Step 8.2.1) 3a. Verify NO RPS Half-Scram signals exist SAT/ UNSAT p | |||
STD: Observes all scram solenoid lights energized 3b. Notify CRO that the following steps will SAT/ UNSAT initiate a Half-Scram p | |||
STD: Proper communications used NRC 2015 JPM S-3 Page 5 of 10 March 2015 | |||
~* Exelon Generation 3c. Verify all four MSIV SOV continuity ammeters SAT I UNSAT indicate greater than lOOmA STD: Dispatch another Role Play: If dispatched to the Aux Control p operator to the Aux Room, acknowledge the request and report Control Room to perform all four MSIV SOV continuity ammeters the verification indicate greater than lOOmA | |||
: 4. Place Main Steam Isolation Valve 7% Test PASS/ FAIL Switch to the 112 position (Step 8.2.2) | |||
P STD: Test switch is rotated to the 112 position | |||
: 5. Confirm 01-03 MSIV 112 white test light ON SAT/ UNSAT (Step 8.2.3) p STD: White test light for MSIV 112 is verified | |||
: 6. Confirm 01-03 MSIV 112 yellow light OFF SAT I UNSAT (Step 8.2.4) p STD: Yellow light for Note: Step 8.2.5 will be N/A. MSIV 112 is verified de-energized Note: JPM steps 7 to 11 will occur in rapid sequence; expect annunciators Fl 7 and Fl-2-1. | |||
Cue: Notify the candidate that you will be monitoring the valve mimic board for MSIV 112. | |||
: 7. Momentarily place 01-03 MSIV-112 control PASS/ FAIL switch to CLOSE position (Step 8.2.6) p STD: Rotates control switch for MSIV 112 momentarily CCW to CLOSE, then releases NRC 2015 JPM S-3 Page 6 of 10 March 2015 | |||
Generation | =~Exelon Generation | ||
: 8 | : 8. Confirm RPS Channel 11 Half-Scram SAT I UNSAT indications STD: Observes: | ||
* CHANNEL 11 SCRAM SOLENOID GROUPS 1, 2, 3, 4, white light off | * CHANNEL 11 SCRAM SOLENOID GROUPS 1, 2, 3, 4, white light off | ||
* CHANNEL 11 B.U. SCRAM S.D.V. VENT & DRAIN VALVE red light off | * CHANNEL 11 B.U. | ||
* Annunciator Fl-1-7, RPS CH 11 MN STM LINE 11 ISOL VALVE CLOSED, alarms | SCRAM S.D.V. VENT & | ||
* Annunciator Fl-2-1, RPS CH 11 AUTO REACTOR TRIP, alarms SAT/ UNSAT STD: Observes: | p DRAIN VALVE red light off Cue: If Fl-1-7 is cleared before candidate | ||
* 01-03 MSIV-112 Green Light ON momentarily | * Annunciator Fl-1-7, completes verification, report that Fl-1-7 RPS CH 11 MN STM alarmed and cleared as expected. LINE 11 ISOL VALVE CLOSED, alarms | ||
* Annunciator Fl-2-1, RPS CH 11 AUTO REACTOR TRIP, alarms | |||
: 9. Confirm 01-03, MSIV-112 automatic partial SAT/ UNSAT closure indications STD: Observes: | |||
* 01-03 MSIV-112 Green Light ON momentarily p | |||
* 01-03 MSIV-112 Red Cue: The MSIV 112 mimic light came on Light ON and went off as expected. | |||
* 01-03 MSIV-112 Mimic Light ON momentarily | |||
: 10. Confirm 01-03 MSIV-112 yellow light SAT I UNSAT illuminated BRIGHT P STD: Observes 01-03 MSIV 112 yellow test light ON brightly NRC 2015 JPM S-3 Page 7 of 10 March 2015 | |||
=:rExelon Generation | |||
: 11. Confirm 01-03 MSIV-112 automatic opening SAT I UNSAT indications STD: Observes: | |||
* 01-03 MSIV-112 Green Light OFF p | |||
* 01-03 MSIV-112 Red Light ON | * 01-03 MSIV-112 Red Light ON | ||
* 01-03 MSIV-112 Mimic Light | * 01-03 MSIV-112 Mimic Light OFF | ||
: 12. Place MSIV 7% Test Switch to the OFF PASS/ FAIL position STD: Rotates Test Switch p | |||
Cue: Inform candidate that another to OFF operator has completed the Independent Verification. | |||
: 12. Place MSIV 7% Test Switch to the OFF position Cue: Inform candidate that another operator has completed the Independent Verification. | : 13. Confirm 01-03 MSIV 112 White Test Light SAT/ UNSAT OFF P STD: Observes White Test Light for MSIV-112 is OFF | ||
: 13. Confirm 01-03 MSIV 112 White Test Light | : 14. Confirm 01-03 MSIV 112 Yellow Light OFF SAT/ UNSAT P STD: Observes Yellow Light for MSIV-112 is OFF | ||
: 15. Depress REACTOR TRIP RESET at PASS/ FAIL Panel E STD: Depresses Rx Trip Fl-2-1 clears RESET Button on E-Console NRC 2015 JPM S-3 Page 8 of 10 March 2015 | |||
Generation | =~Exelon Generation | ||
: 16. Confirm RPS Channel 11 Half-Scram | : 16. Confirm RPS Channel 11 Half-Scram SAT I UNSAT indications clear STD: Observes: | ||
* CHANNEL 11 SCRAM SOLENOID Groups 1,2,3,4 White Light ON | * CHANNEL 11 SCRAM SOLENOID Groups 1,2,3,4 White Light ON | ||
* CHANNEL 11 BACKUP SCRAM VALVE S.D.V. VENT ND DRAIN VALVE Red Light ON | * CHANNEL 11 BACKUP SCRAM VALVE S.D.V. | ||
VENT ND DRAIN VALVE Red Light ON | |||
* Annunciator Fl-1-7, RPS CH 11 MN STM LINE 11 ISOL VALVE CLOSED, clear | * Annunciator Fl-1-7, RPS CH 11 MN STM LINE 11 ISOL VALVE CLOSED, clear | ||
* Annunciator Fl-2-1, RPS CH 11 AUTO REACTOR TRIP, clear | * Annunciator Fl-2-1, RPS CH 11 AUTO REACTOR TRIP, clear Cue: Your task is complete. | ||
Nl-ST-Q26 completed for MSIV 01-03. | |||
NRC 2015 JPM S-3 Page 9 of 10 March 2015 | |||
Exelon Generation JPM Handout Given: | |||
* The plant is operating at 100% power. | * The plant is operating at 100% power. | ||
* All prerequisites for Nl-ST-Q26 are complete. | * All prerequisites for Nl-ST-Q26 are complete. | ||
* Section 8.1 has been completed. | * Section 8.1 has been completed. | ||
(Operators Name), test Main Steam Line Isolation Valve 112 in accordance with Nl-ST-Q26, Section 8.2. Page 10 of 10 March 2015 | (Operators Name), test Main Steam Line Isolation Valve 112 in accordance with Nl-ST-Q26, Section 8.2. | ||
=:""Exelon Generation Training Id: 2015 NRC JPM S-4 Revision: | NRC 2015 JPM 5-3 Page 10 of 10 March 2015 | ||
0.0 Title: Transfer House Loads from Reserve to Normal -N 1-0P-30 Approvals: | |||
Printed Name Developed By llh | =:""Exelon Generation Training Id: 2015 NRC JPM S-4 Revision: 0.0 | ||
15 minutes Documentation of Performance: | |||
==Title:== | |||
Transfer House Loads from Reserve to Normal - N 1-0P-30 Approvals: | |||
Printed Name Developed By ~/~p au llh s am 03/17/14 Validated By Leigh Mason 8/20/14 Facility Reviewer Approximate Duration: 15 minutes Documentation of Performance: | |||
Performer: | Performer: | ||
Evaluator: | Evaluator: | ||
Start Time: Stop Time: Completion Time Grade: Pass I Fail Comments: | Start Time: Stop Time: Completion Time Grade: Pass I Fail Comments: | ||
Evaluators Signature: | Evaluators Signature: Date: | ||
Date: NRC 2015 JPM 5-4 Page 1of10 March 2015 | NRC 2015 JPM 5-4 Page 1of10 March 2015 | ||
Generation Instructor Information A. JPM Information | Exelon Generation References | ||
: 1. Description | : 1. Nl-OP-30, 4.16KV, 600V, and 480V House Service | ||
: a. This JPM tests the operator's ability to manipulate electrical system controls to parallel two AC sources. | : 2. NUREG 1123 K/A 262001 A4.04, (3.6/3.7) | ||
The operator will shilt house service loads from the reserve transformers to the normal transformers, as is done during a plant start up. b. This JPM is NOT considered alternate path. 2. Task Information: | NRC 2015 JPM S-4 Page 2 of 10 March 2015 | ||
: a. Nl-262001-01001 | |||
: b. K/ A 262001 A4.04, (3.6/3. 7) 3. Evaluation I Task Criteria Perform Simulator No No Yes 4. Recommended Start Location | =~Exelon Generation Instructor Information A. JPM Information | ||
: a. Unit 1 Simulator NRC 2015 JPM 5-4 Page 3 of 10 March 2015 Exelon Generation | : 1. Description | ||
: 5. Simulator Setup (if required) | : a. This JPM tests the operator's ability to manipulate electrical system controls to parallel two AC sources. The operator will shilt house service loads from the reserve transformers to the normal transformers, as is done during a plant start up. | ||
: a. The reactor is in a power operating condition | : b. This JPM is NOT considered alternate path. | ||
: b. Initialize simulator to IC 162 c. Verify Powerboards 11 and 12 are ready to be transferred to the normal transformer. | : 2. Task Information: | ||
: 6. JPM Setup (if required) | : a. Nl-262001-01001 | ||
: a. Provide copy of Nl-OP-30 B. Read Before Every JPM Performance | : b. K/ A 262001 A4.04, (3.6/3. 7) | ||
: 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. | : 3. Evaluation I Task Criteria Perform Simulator No No Yes | ||
During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | : 4. Recommended Start Location | ||
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | : a. Unit 1 Simulator NRC 2015 JPM 5-4 Page 3 of 10 March 2015 | ||
Repositioning of devices will be simulated by discussion and acknowledged by my cues. C. Read Before Each Evaluated JPM 1. This evaluated JPM is a measure of your ability to perform this task independently. | |||
Exelon Generation | |||
: 5. Simulator Setup (if required) | |||
: a. The reactor is in a power operating condition | |||
: b. Initialize simulator to IC 162 | |||
: c. Verify Powerboards 11 and 12 are ready to be transferred to the normal transformer. | |||
: 6. JPM Setup (if required) | |||
: a. Provide copy of Nl-OP-30 B. Read Before Every JPM Performance | |||
: 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues. | |||
C. Read Before Each Evaluated JPM | |||
: 1. This evaluated JPM is a measure of your ability to perform this task independently. | |||
The CRS has determined that a verifier is not available and that additional verification will not be provided. | The CRS has determined that a verifier is not available and that additional verification will not be provided. | ||
NRC 2015 JPM S-4 Page 4 of 10 March 2015 | NRC 2015 JPM S-4 Page 4 of 10 March 2015 | ||
Exelon Generation Given: | |||
* The reactor is in an operating condition after a recent plant startup | * The reactor is in an operating condition after a recent plant startup | ||
* The reserve transformers are supplying house loads | * The reserve transformers are supplying house loads | ||
* Main Generator load is stable | * Main Generator load is stable | ||
* S-ODP-OPS-112 Attachment 4 has been completed for transferring House loads Evaluator: | * S-ODP-OPS-112 Attachment 4 has been completed for transferring House loads Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), transfer normal house service from the reserve transformers to normal in accordance with Nl-OP-30, section E.15. | ||
Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), transfer normal house service from the reserve transformers to normal in accordance with Nl-OP-30, section E.15. Provide repeat back of initiating cue Cue: Acknowledge repeat back providing correction if necessary Obtain a copy of the reference procedure and review / utilize the correct section of the | : 1. Provide repeat back of initiating cue SAT/ UNSAT p | ||
Precautions | Cue: Acknowledge repeat back providing STD: Proper communications used correction if necessary | ||
& limitations reviewed | : 2. Obtain a copy of the reference procedure and SAT I UNSAT review / utilize the correct section of the p STD: Nl-OP-30 obtained. | ||
& section E.15 referenced SAT/ UNSAT STD: Observes main p generator megawatts stable (meters on Panels E or A7, digital indication on Panel K). Or determines stable from initial conditions. | procedure Precautions & limitations reviewed & section E.15 referenced | ||
NRC 2015 JPM S-4 Page 5 of 10 March 2015 | : 3. Confirm Main Generator load stable SAT/ UNSAT (Step 15.1) | ||
=:r-Exelon Generation NRC 2015 JPM S-4 Page 6 of 10 March 2015 Exelon Generation | STD: Observes main p generator megawatts stable (meters on Panels E or A7, digital indication on Panel K). Or determines stable from initial conditions. | ||
: 8. Close Breaker R113 AND immediately open | NRC 2015 JPM S-4 Page 5 of 10 March 2015 | ||
=:r-Exelon Generation NRC 2015 JPM S-4 Page 6 of 10 March 2015 | |||
Exelon Generation A~* | |||
. P,/S. | |||
: 8. Close Breaker R113 AND immediately open PASS/ FAIL R112 STD: Rotates Rl 13 control (Step 15.6) switch CW to CLOSE, observes red light on and p green light off. | |||
When Rl 13 is closed, rotates Rl 12 control switch CCW to TRIP, observes green light on and red light off | |||
: 9. Leave R112 control switch in neutral position SAT/ UNSAT (Step 15.7) p STD: Releases Rl 12 control switch to NEUTRAL | |||
: 10. Place Sync Key in OFF position SAT I UNSAT (Step 15.8) p STD: Rotates Sync. Key in Breaker R113 CCW to OFF | |||
: 11. Remove Sync Key from R113 SAT/ UNSAT (Step 15.9) p STD: Removes Sync. Key from Breaker R113 | |||
: 12. Insert Sync Key in R122 AND perform the SAT I UNSAT following: | |||
p STD: Positions Sync. Key in (Step 15.10) | |||
Breaker R122 12a Turn Sync Key ON PASS/ FAIL P STD: Rotates Sync. Key for Breaker R122 CW to ON 12b Confirm incoming voltage slightly above SAT/ UNSAT running voltage p STD: Observes INCOMING and RUNNING voltages NRC 2015 JPM S-4 Page 7 of 10 March 2015 | |||
Generation | Exelon Generation 12c IF required, THEN make voltage adjustment SAT I UNSAT with Tap Changer on Transformer 10. | ||
: 18. Notify Electrical Maintenance to complete Attachment 12 of Nl-0P-43A to confirm Auto transfer capability. | STD: Adjusts TAP CHGR P CONT TRANS 10 to match incoming and running voltages, if required | ||
(Step 15.16) Cue: Your task is complete. | : 13. Close Breaker R122 AND immediately open PASS/ FAIL R123 (Step 15.11) STD: Rotates R122 control switch CW to CLOSE, observes red light on and p green light off. | ||
When R122 is closed, rotates R123 control switch CCW to TRIP, observes green light on and red light off | |||
-T-10. NRC 2015 JPM S-4 Page 9 of 10 March 2015 | : 14. Leave R123 control switch in neutral position SAT/ UNSAT (Step 15.12) p STD: Releases R123 control switch to NEUTRAL | ||
=:r-Exelon Generation | : 15. Place Sync Key in OFF position SAT I UNSAT (Step 15.13) p STD: Rotates Sync. Key in Breaker R122 CCW to OFF | ||
: 16. Remove Sync Key from R122 SAT I UNSAT (Step 15.14) p STD: Removes Sync. Key from Breaker R122 | |||
: 17. Adjust Power Boards 11 AND 12 voltages to SAT I UNSAT I NA 4160 volts using Tap Changer on Transformer 10. p STD: Adjusts TAP CHGR CONT TRANS 10, if required (Step 15.15) | |||
NRC 2015 JPM S-4 Page 8 of 10 March 2015 | |||
=~Exelon Generation | |||
: 18. Notify Electrical Maintenance to complete SAT I UNSAT Attachment 12 of Nl-0P-43A to confirm Auto p STD: Proper transfer capability. | |||
communications used (Step 15.16) | |||
Cue: Your task is complete. | |||
House loads are supplied by the normal transformer - T-10. | |||
NRC 2015 JPM S-4 Page 9 of 10 March 2015 | |||
=:r-Exelon Generation JPM Handout Given: | |||
* The reactor is in an operating condition after a recent plant startup | * The reactor is in an operating condition after a recent plant startup | ||
* The reserve transformers are supplying house loads | * The reserve transformers are supplying house loads | ||
* Main Generator load is stable | * Main Generator load is stable | ||
* S-ODP-OPS-112 Attachment 4 has been completed for transferring House loads {Operators Name), transfer normal house service from the reserve transformers to normal in accordance with Nl-OP-30, section E.15. Page 10 of 10 March 2015 Exelon Generation Training Id: 2015 NRC JPM S-5 Revision: | * S-ODP-OPS-112 Attachment 4 has been completed for transferring House loads | ||
0.0 | {Operators Name), transfer normal house service from the reserve transformers to normal in accordance with Nl-OP-30, section E.15. | ||
NRC 2015 JPM 5-4 Page 10 of 10 March 2015 | |||
Exelon Generation Training Id: 2015 NRC JPM S-5 Revision: 0.0 Shift Reactor Building Operating Exhaust and Supply Fans From | |||
==Title:== | |||
#11 to #12 (Faulted) | |||
Approvals: | Approvals: | ||
Developed By Paul Isham 03/17/14 Validated By Pat O'Brien 8/20/14 Facility Reviewer Greg Elkins Approximate Duration: | Developed By Paul Isham 03/17/14 Validated By Pat O'Brien 8/20/14 Facility Reviewer Greg Elkins Approximate Duration: - - - | ||
15-minutes Documentation of Performance: | |||
15 minutes Documentation of Performance: | |||
Performer: | Performer: | ||
Evaluator: | Evaluator: | ||
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | ||
Evaluators Signature: | Evaluators Signature: ---------- | ||
---------- | Date: | ||
Date: NRC 2015 JPM S-5 Page 1of9 March 2015 | NRC 2015 JPM S-5 Page 1of9 March 2015 | ||
References | =~Exelon Generation~ | ||
: 1. Nl-OP-10, Reactor Building | References | ||
: 1. Nl-OP-10, Reactor Building Heating, Cooling, and Ventilating System | |||
NRC 2015 JPM S-5 Page 2 of 9 March 2015 | : 2. NUREG 1123 K/A 288000 A4.01, (3.1/2.9) | ||
,1118ar* | NRC 2015 JPM S-5 Page 2 of 9 March 2015 | ||
Exelon Generation Instructor Information A. JPM Information | |||
: 1. Description | ,1118ar* Exelon Generation Instructor Information A. JPM Information | ||
: a. This JPM tests the operator's ability to operate the Reactor Building Ventilation System. b. This JPM is not considered alternate path, but it is faulted, because one of the newly started fans displays abnormal operating parameters which should prompt the operator to restore reactor building ventilation back to a functioning lineup. 2. Task Information: | : 1. Description | ||
: a. Nl-288001-01002 | : a. This JPM tests the operator's ability to operate the Reactor Building Ventilation System. | ||
: b. K/A 288000 A4.01, (3.1/2.9) | : b. This JPM is not considered alternate path, but it is faulted, because one of the newly started fans displays abnormal operating parameters which should prompt the operator to restore reactor building ventilation back to a functioning lineup. | ||
: 3. Evaluation | : 2. Task Information: | ||
/Task Criteria Perform Simulator No No Yes 4. Recommended Start Location | : a. Nl-288001-01002 | ||
: a. Unit 1 Simulator NRC 2015 JPM S-5 Page 3 of 9 March 2015 | : b. K/A 288000 A4.01, (3.1/2.9) | ||
=::rExelon Generation | : 3. Evaluation /Task Criteria Perform Simulator No No Yes | ||
: 5. Simulator Setup (if required) | : 4. Recommended Start Location | ||
: a. Initialize simulator to IC-163 b. RX Building Supply and Exhaust Fans #11 in service. | : a. Unit 1 Simulator NRC 2015 JPM S-5 Page 3 of 9 March 2015 | ||
=::rExelon Generation | |||
: 5. Simulator Setup (if required) | |||
: a. Initialize simulator to IC-163 | |||
: b. RX Building Supply and Exhaust Fans #11 in service. | |||
: c. RB VENT JPM SETUP | : c. RB VENT JPM SETUP | ||
* Event trigger -set TRG 3 to ZDHVF02T==O | * Event trigger - set TRG 3 to ZDHVF02T==O | ||
* Overrides assigned to TRG 3 (Delete overrides when Supply Fan 12 switch is taken to STOP.) | * Overrides assigned to TRG 3 (Delete overrides when Supply Fan 12 switch is taken to STOP.) | ||
* 11S68DI54912, RB Supply Fan 12 & Inlet Damper, ON | * 11S68DI54912, RB Supply Fan 12 & Inlet Damper, ON | ||
Line 830: | Line 1,145: | ||
* 11DS230L05625, Reactor Bldg Supply Fan 12 SLOW Red light ON | * 11DS230L05625, Reactor Bldg Supply Fan 12 SLOW Red light ON | ||
* 11DS216L05617, Reactor Bldg Supply Fan 12 Inlet Damper Green light OFF DT=lSsec | * 11DS216L05617, Reactor Bldg Supply Fan 12 Inlet Damper Green light OFF DT=lSsec | ||
* 11DS217L05618, Reactor Bldg Supply Fan 12 Inlet Damper Red light ON 6. JPM Setup (if required) | * 11DS217L05618, Reactor Bldg Supply Fan 12 Inlet Damper Red light ON | ||
: a. No steps need to be marked up. B. Read Before Every JPM Performance | : 6. JPM Setup (if required) | ||
: 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. | : a. No steps need to be marked up. | ||
During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | B. Read Before Every JPM Performance | ||
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | : 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues. | ||
Repositioning of devices will be simulated by discussion and acknowledged by my cues. C. Read Before Each Evaluated JPM 1. This evaluated JPM is a measure of your ability to perform this task independently. | C. Read Before Each Evaluated JPM | ||
: 1. This evaluated JPM is a measure of your ability to perform this task independently. | |||
The CRS has determined that a verifier is not available and that additional verification will not be provided. | The CRS has determined that a verifier is not available and that additional verification will not be provided. | ||
NRC 2015 JPM S-5 Page 4 of 9 March 2015 | NRC 2015 JPM S-5 Page 4 of 9 March 2015 | ||
Exelon Generation(, | |||
Given: | Given: | ||
* Reactor Building Exhaust Fan #11, and Reactor Building Supply Fan # 11 are in service. | * Reactor Building Exhaust Fan #11, and Reactor Building Supply Fan | ||
Evaluator: | # 11 are in service. | ||
Ask trainee if he/she has any questions after presenting initial conditions | Evaluator: Ask trainee if he/she has any questions after presenting initial conditions | ||
{Operators Name), Place Reactor Building Exhaust and Supply Fans #12 in service IAW Nl-OP-10 Section F.1.0 and F.2.0. '*' '.' Provide repeat back of initiating cue SAT/ UNSAT Cue: Acknowledge repeat back providing | {Operators Name), Place Reactor Building Exhaust and Supply Fans #12 in service IAW Nl-OP-10 Section F.1.0 and F.2.0. | ||
Precautions | '*' '.' ~' | ||
& limitations reviewed | : 1. Provide repeat back of initiating cue SAT/ UNSAT p STD: Proper communications Cue: Acknowledge repeat back providing used correction if necessary | ||
& section F.1.0 and F.2.0 referenced. | : 2. Obtain a copy of the reference procedure and SAT/ UNSAT review / utilize the correct section of the procedure p STD: Nl-OP-10 obtained. | ||
Verify operating RX Building supply and SAT I UNSAT exhaust fans in SLOW. (Step 1.2.1) STD: Visually observe p REACTOR BLDG SUPPLY FAN 11 and REACTOR BLDG EXHAUST FAN 11 fans in SLOW red slow light illuminated. | Precautions & limitations reviewed & section F.1.0 and F.2.0 referenced. | ||
Start REACTOR BLDG EXHAUST FAN 12 on PASS/ FAIL SLOW (Step 1.2.2) STD: Rotate REACTOR BLDG p EXHAUST FAN 12 control switch CW to the slow position observe red slow light illuminated, green light off. NRC 2015 JPM S-5 Page 5 of 9 March 2015 Exelon Generation | : 3. Verify operating RX Building supply and SAT I UNSAT exhaust fans in SLOW. (Step 1.2.1) | ||
\ | STD: Visually observe p REACTOR BLDG SUPPLY FAN 11 and REACTOR BLDG EXHAUST FAN 11 fans in SLOW red slow light illuminated. | ||
: 4. Start REACTOR BLDG EXHAUST FAN 12 on PASS/ FAIL SLOW (Step 1.2.2) | |||
: 7. Confirm damper 202-08, REACTOR BLDG SAT/ UNSAT EXHAUST FAN 11 OUTLET DAMPER closed. (Step 1.2.5) | STD: Rotate REACTOR BLDG p EXHAUST FAN 12 control switch CW to the slow position observe red slow light illuminated, green light off. | ||
: 13. Secure REACTOR BLDG SUPPLY FAN 12. Note: Booth operator, delete all overrides when Supply Fan 12 is secured. | NRC 2015 JPM S-5 Page 5 of 9 March 2015 | ||
: 14. Secure REACTOR BLDG SUPPLY FAN 11 Cue: If directed from Ll-2-4 report the following: | |||
* Heating Unit is tripped | Exelon Generation | ||
* Inlet Filter differential pressure is normal NRC 2015 JPM S-5 Page 7 of 9 SAT I UNSAT I NA | \ ~'.' | ||
PASS | : 5. Confirm damper 202-07, REACTOR BLDG SAT/ UNSAT EXHAUST FAN 12 OUTLET DAMPER open. p STD: Observe 202-07 open (Step 1.2.3) red light on, green light off. | ||
: 6. Stop REACTOR BLDG EXHAUST FAN 11. PASS/ FAIL (Step 1.2.4) p STD: Rotate REACTOR BLDG EXHAUST FAN 11 control switch CCW to the Off position. | |||
: 7. Confirm damper 202-08, REACTOR BLDG SAT/ UNSAT EXHAUST FAN 11 OUTLET DAMPER closed. | |||
p STD: Observe REACTOR (Step 1.2.5) | |||
BLDG EXHAUST FAN 11 OUTLET DAMPER closed green light on, red light off. | |||
: 8. Confirm normal system flow. SAT I UNSAT (Step 1.3) p STD: Observe annunciator Ll-2-5 RB VENT EXH FLOW LOW is clear. | |||
: 9. Start REACTOR BLDG SUPPLY FAN 12 on PASS/ FAIL SLOW. (Step 2.2.2) | |||
STD: Rotate REACTOR BLDG p SUPPLY FAN 12 control switch CW to the Slow position observe red slow light illuminated, green light off. | |||
: 10. Confirm damper FCV 202-04, REACTOR SAT I UNSAT / NA BLDG SUPPLY FAN 12 INLET DAMPER open. p STD: Observe 202-04 open (Step 2.2.3) red light on, green light off NRC 2015 JPM S-5 Page 6 of 9 March 2015 | |||
Exelon Generation Note: Candidate may not notice amps low and continue in procedure to secure Fan 11. | |||
There are 2 success paths. | |||
: 1. Low amps identified after Supply Fan 12 start. Candidate performs steps 11,12,13 and 18, with step 13 a critical step. | |||
: 2. Low amps not identified after Supply Fan 12 start. Candidate performs steps 14,15,16,17,18, with steps 16 and 17 as critical step. | |||
: 11. Identify low amps on REACTOR BLDG SAT I UNSAT I NA SUPPLY FAN 12. | |||
p STD: Observe low amps on Fan 12 (5-10 amps) with Fan 11 amps remaining at normal ( ,,,30 amps). | |||
: 12. Inform SM of low amps on REACTOR BLDG SAT I UNSAT / NA SUPPLY FAN 12. | |||
p STD: Recommend Fan 11 remains in service and Fan Cue: As SM, concur and allow Fan 11 to 12 be shutdown. | |||
remain in service. | |||
: 13. Secure REACTOR BLDG SUPPLY FAN 12. PASS / FAIL / NA p STD: Rotate REACTOR BLDG Note: Booth operator, delete all overrides SUPPLY FAN 12 control when Supply Fan 12 is secured. switch CCW to the Off position. | |||
: 14. Secure REACTOR BLDG SUPPLY FAN 11 SAT/ UNSAT I NA Cue: If directed from Ll-2-4 report the STD: Rotate REACTOR BLDG SUPPLY FAN 11 control following: switch CCW to the Off | |||
* Heating Unit is tripped position and observe red p slow light off, green light | |||
* Inlet Filter differential pressure is normal illuminated. | |||
Observe annunciator Ll-3-4 and Ll-2-4 alarm Observe RB dp indication rises indicating high negative dp NRC 2015 JPM S-5 Page 7 of 9 March 2015 | |||
=~Exelon Generation | |||
: 15. Report abnormal indication to SM SAT I UNSAT I NA STD: Recommend returning Cue: As SM, concur and allow Fan 11 to be Fan 11 to service and returned to service and Fan 12 to be securing Fan 12 shutdown. | |||
: 16. Start REACTOR BLDG SUPPLY FAN 11 on PASS I FAIL I NA SLOW. | |||
STD: Rotate REACTOR BLDG SUPPLY FAN 11 control Annunciators Ll-3-4 and Ll-2-4 clear switch CW to the Slow RB dp indication returns to normal position observe red slow light illuminated, green light off. | |||
: 17. Secure REACTOR BLDG SUPPLY FAN 12 PASS / FAIL I NA STD: Rotate REACTOR BLDG Note: Booth operator, delete all overrides SUPPLY FAN 12 control when Supply Fan 12 is secured. switch CCW to the Off position and observe red slow light off, green light illuminated. | |||
: 18. Notify CRS/SM that REACTOR BLDG SUPPLY SAT I UNSAT I NA FAN 11 has been returned to service with STD: Proper communications normal dp and REACTOR BLDG supply FAN p used. | |||
12 is secured. | |||
Cue: Acknowledge report. | |||
Cue: Your task is complete. | |||
Misoperation identified on Supply Fan 12. Supply Fan 11 is running with either Exhaust Fan 11 or 12 running. | |||
NRC 2015 JPM S-5 Page 8 of 9 March 2015 | |||
Exelon Generation JPM Handout Given: | |||
* Reactor Building Exhaust Fan #11, and Reactor Building Supply Fan | |||
# 11 are in service. | |||
(Operators Name), Place Reactor Building Exhaust and Supply Fans #12 in service IAW Nl-OP-10 Section F.1.0 and F.2.0. | |||
NRC 2015 JPM S-5 Page 9 of 9 March 2015 | |||
Generation | =~Exelon Generation Training Id: 2015 NRC JPM S-6 Revision: 0.0 | ||
==Title:== | |||
Control Rod Exercising Operability Test N1-ST-W1 (Alternate Path) | |||
Si rinted Name Developed By Isham 01/29/2015 Validated By Kerry Henderson 02/03/15 Facility Reviewer Greg Elkins Approximate Duration: | Approvals: | ||
15 minutes Documentation of Performance: | Si rinted Name Developed By | ||
~ | |||
4/'/V/~Paul Isham 01/29/2015 Validated By Kerry Henderson 02/03/15 Facility Reviewer Greg Elkins Approximate Duration: 15 minutes Documentation of Performance: | |||
Performer: | Performer: | ||
Evaluator: | Evaluator: | ||
Start Time: Stop Time: Completion Time Grade: Pass I Fail Comments: | Start Time: Stop Time: Completion Time Grade: Pass I Fail Comments: | ||
Evaluators Signature: | Evaluators Signature: - - - - - - - - - - Date: | ||
---------- | JPM S-6 Page 1of12 NRC March 2014 | ||
Date: JPM S-6 Page 1of12 NRC March 2014 Exelon Generation References | |||
: 1. Nl-ST-Wl, Control Rod Exercising Operability Test 2. Nl-OP-5, Control Rod Drive System JPM S-6 Page 2 of 12 NRC March 2014 | Exelon Generation References | ||
=::--Exelon Generation Instructor Information A. JPM Information | : 1. Nl-ST-Wl, Control Rod Exercising Operability Test | ||
: 1. Description | : 2. Nl-OP-5, Control Rod Drive System JPM S-6 Page 2 of 12 NRC March 2014 | ||
: | |||
=::--Exelon Generation Instructor Information A. JPM Information | |||
: 1. Description | |||
: a. This JPM tests the operator's ability to perform the weekly control rod exercise surveillance, N 1-ST-Wl. | |||
: b. This JPM is considered alternate path because rod position indication will be lost while exercising rods, requiring the operator to take actions prescribed in the Control Rod Drive Operating Procedure. | : b. This JPM is considered alternate path because rod position indication will be lost while exercising rods, requiring the operator to take actions prescribed in the Control Rod Drive Operating Procedure. | ||
Task Information: | : 2. Task Information: | ||
: a. Nl-214000-01001, Monitor RPIS b. K/A 214000, A4.02 (3.8/3.8) | : a. Nl-214000-01001, Monitor RPIS | ||
Evaluation I Task Criteria Perform Simulator No Yes Yes Recommended Start Location | : b. K/A 214000, A4.02 (3.8/3.8) | ||
: a. Unit 1 Simulator JPM S-6 Page 3 of 12 NRC March 2014 | : 3. Evaluation I Task Criteria Perform Simulator No Yes Yes | ||
: 4. Recommended Start Location | |||
: a. Unit 1 Simulator JPM S-6 Page 3 of 12 NRC March 2014 | |||
Generation | =~Exelon Generation | ||
: 5. Simulator Setup (if required) | : 5. Simulator Setup (if required) | ||
: a. Initialize simulator to IC-163 b. Verify RD08R0231 is assigned to trigger 1 c. Verify Event Trigger #1 hzlrdin==l&hzlrdself(72)==1 | : a. Initialize simulator to IC-163 | ||
: d. Ensure process computer is not available | : b. Verify RD08R0231 is assigned to trigger 1 | ||
: 6. JPM Setup (if required) | : c. Verify Event Trigger #1 hzlrdin==l&hzlrdself(72)==1 | ||
: a. Prepare a copy of Nl-ST-Wl, marked with step 6.1 -6.2.4 complete. | : d. Ensure process computer is not available | ||
JPM 5-6 Page 4 of 12 NRC March 2014 Exelon Generation B. Read Before Every JPM Performance | : 6. JPM Setup (if required) | ||
: 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. | : a. Prepare a copy of Nl-ST-Wl, marked with step 6.1 - 6.2.4 complete. | ||
During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | JPM 5-6 Page 4 of 12 NRC March 2014 | ||
Exelon Generation B. Read Before Every JPM Performance | |||
: 1. For the performance of this JPM, I will act as all those you need to talk to. | |||
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | |||
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | ||
Repositioning of devices will be simulated by discussion and acknowledged by my cues. C. Read Before Each Evaluated JPM 1. This evaluated JPM is a measure of your ability to perform this task independently. | Repositioning of devices will be simulated by discussion and acknowledged by my cues. | ||
The CRS has determined that a verifier is not available and that additional verification will not be provided. | C. Read Before Each Evaluated JPM | ||
JPM S-6 Page 5 of 12 NRC March 2014 | : 1. This evaluated JPM is a measure of your ability to perform this task independently. The CRS has determined that a verifier is not available and that additional verification will not be provided. | ||
&:r'Exelon Generation | JPM S-6 Page 5 of 12 NRC March 2014 | ||
&:r'Exelon Generation Given: | |||
* The plant is online. | * The plant is online. | ||
* Weekly Control Rod exercising is in progress. | * Weekly Control Rod exercising is in progress. | ||
* The process computer is unavailable. | * The process computer is unavailable. | ||
* Nl-ST-Wl is complete through step 6.2.4. | * Nl-ST-Wl is complete through step 6.2.4. | ||
* No rods are expected to double notch. Evaluator: | * No rods are expected to double notch. | ||
Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), Complete Nl-ST-Wl, starting at step 6.2.5. Begin with rod 02-35 and continue with the sequence outlined in attachment | Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), Complete Nl-ST-Wl, starting at step 6.2.5. Begin with rod 02-35 and continue with the sequence outlined in attachment 1. | ||
Document applicable rod movement information on attachment 1. | |||
: 1. Provide repeat back of initiating cue p SAT I UNSAT Cue: Acknowledge repeat back providing STD: Proper communications correction if necessary. | : 1. Provide repeat back of initiating cue p SAT I UNSAT Cue: Acknowledge repeat back providing STD: Proper communications correction if necessary. used. | ||
: 2. Obtain a copy of Nl-ST-Wl and review/ p SAT I UNSAT utilize the correct section of the procedure STD: Obtains copy of Nl-ST-Wl. Section 6.2 is referenced | |||
: 4. | : 3. Depress the rod select pushbutton for p SAT I UNSAT Control Rod to be tested on Rod Map Display STD: Depresses pushbutton for at E panel. (Step 6.2.5) control rod 02-35. Observes white light lit. | ||
Confirm the following: | JPM S-6 Page 6 of 12 NRC March 2014 | ||
(Step 6.2.8) | |||
* Rod select pushbutton back lighted on Rod Map Display | Exelon Generation | ||
* Select light illuminated for appropriate Control Rod at F Panel Step 6.2.9 -"IF Control Rod is expected to double notch ... " PLACE 4S1, CONTROL ROD MOVEMENT switch to ROD IN position UNTIL ROD IN light illuminates. | : 4. RECORD selected control rod's initial position p SAT/ UNSAT on Attachment 1, Control Rod Exercising STD: Records position 48 for Data Sheet. (Step 6.2.6) control rod 02-35 Cue: If the applicant requests status of V138 (step 6.2. 7), report V138 has a normal response. | ||
(Step 6.2.10) Determines steps 6.2.11, 6.2.12, 6.2.14, and 6.2.15 are NA Record the following on Attachment 1: | : 5. Confirm the following: (Step 6.2.8) p SAT/ UNSAT | ||
* New control rod position | * Rod select pushbutton back lighted on STD: Observes both white Rod Map Display lights lit. | ||
* Drive-To-Reactor d/p (step 6.2.13) 10 Withdraw control rod to initial position as follows: | * Select light illuminated for appropriate Control Rod at F Panel | ||
(step 6.2.16) JPM S-6 Page 7 of 12 | : 6. Step 6.2.9 - "IF Control Rod is expected to p SAT I UNSAT double notch ... " STD: Determine step is NA per initial conditions. | ||
: 7. PLACE 4S1, CONTROL ROD MOVEMENT p PASS I FAIL switch to ROD IN position UNTIL ROD IN light STD: Places control rod illuminates. (Step 6.2.10) movement switch to the Rod In position. Observes rod settle at position 46. | |||
: 8. Determines steps 6.2.11, 6.2.12, 6.2.14, p SAT/ UNSAT and 6.2.15 are NA | |||
: 9. Record the following on Attachment 1: p SAT/ UNSAT | |||
NRC March 2014 | * New control rod position STD: Records position 46 for | ||
=::""Exelon Generation 10.a Confirm the following: | * Drive-To-Reactor d/p control rod 02-35. And (step 6.2.13) approximately 250 psi differential pressure. | ||
p SAT/ UNSAT STD: Observes both white | 10 Withdraw control rod to initial position as follows: (step 6.2.16) | ||
* Rod select pushbutton back lighted on lights lit. Rod Map Display | JPM S-6 Page 7 of 12 NRC March 2014 | ||
* Select light illuminated for appropriate Control Rod at F Panel 10.b PLACE CONTROL ROD MOVEMENT switch in p PASS I FAIL ROD OUT NOTCH, UNTIL ROD IN light STD: Places control rod | |||
movement switch to the Rod Out Notch position. | =::""Exelon Generation 10.a Confirm the following: p SAT/ UNSAT STD: Observes both white | ||
Observes rod settle at position | * Rod select pushbutton back lighted on lights lit. | ||
Rod Map Display | |||
* Select light illuminated for appropriate Control Rod at F Panel 10.b PLACE CONTROL ROD MOVEMENT switch in p PASS I FAIL ROD OUT NOTCH, UNTIL ROD IN light STD: Places control rod movement switch to the Rod illuminates. | |||
Out Notch position. Observes rod settle at position 48. | |||
11.a SIMULTANEOUSLY PLACE 4Sl to ROD OUT p PASS/ FAIL NOTCH AND 4S3, CONTROL ROD N STD: Simultaneously places OVERRIDE switch to NOTCH OVERRIDE. | 10.c CONFIRM next higher even position p SAT I UNSAT illuminates at F Panel. STD: Observes rod settle at position 48. | ||
10.d Verify final position equals initial position and p SAT/ UNSAT record final position on attachment 1. STD: Records final position on attachment 1 and confirms initial and final positions are the Examiner note: Withdraw to position 48 same. | |||
11.b CONFIRM the following: | may be performed concurrently with the coupling check. | ||
p SAT I UNSAT STD: Observes position 48 and | : 11. Perform coupling check (step 6.2.17): | ||
* Position 48 illuminates with red red backlighting while holding backlighting remains illuminated for switches. | 11.a SIMULTANEOUSLY PLACE 4Sl to ROD OUT p PASS/ FAIL NOTCH AND 4S3, CONTROL ROD N STD: Simultaneously places Control Rod Movement Switch OVERRIDE switch to NOTCH OVERRIDE. | ||
to Rod Out Notch and the Control Rod N Override Switch to Notch Override. | |||
11.b CONFIRM the following: p SAT I UNSAT STD: Observes position 48 and | |||
* Position 48 illuminates with red red backlighting while holding backlighting remains illuminated for switches. | |||
Control Rod selected at F Panel | Control Rod selected at F Panel | ||
* CONTROL ROD OVERTRAVEL annunciator, F3-1-6, does NOT alarm JPM S-6 Page 8 of 12 NRC March 2014 | * CONTROL ROD OVERTRAVEL annunciator, F3-1-6, does NOT alarm JPM S-6 Page 8 of 12 NRC March 2014 | ||
=::"Exelon Generation°' | =::"Exelon Generation°' | ||
11.c RECORD Withdrawal Stall Flow on Attachment | 11.c RECORD Withdrawal Stall Flow on p SAT I UNSAT Attachment 1. STD: Observes stall flow on F Panel. Records on att 1. | ||
: 1. 11.d Record Satisfactory coupling check 12. Select next rod to be exercised 12.a Depress the rod select pushbutton for Control Rod to be tested on Rod Map Display at E panel. (Step 6.2.5) 12.b RECORD selected control rod's initial position on Attachment 1, Control Rod Exercising Data Sheet. (Step 6.2.6) | 11.d Record Satisfactory coupling check p SAT/ UNSAT STD: Checks appropriate block in attachment 1. | ||
Confirm the following: | : 12. Select next rod to be exercised 12.a Depress the rod select pushbutton for p SAT/ UNSAT Control Rod to be tested on Rod Map Display STD: Depresses pushbutton for at E panel. (Step 6.2.5) control rod 02-31. Observes white light lit. | ||
(Step 6.2.8) | 12.b RECORD selected control rod's initial position p SAT/ UNSAT on Attachment 1, Control Rod Exercising STD: Records position 48 for Data Sheet. (Step 6.2.6) control rod 02-31 on attachment 1. | ||
* Rod select pushbutton back lighted on Rod Map Display | Cue: If the applicant requests status of V138 (step 6.2. 7), report V138 has a normal response. | ||
* Select light illuminated for appropriate Control Rod at F Panel Step 6.2. 9 -"IF Control Rod is expected to double notch ... " PLACE 4Sl, CONTROL ROD MOVEMENT switch to ROD IN position UNTIL ROD IN light illuminates. | : 13. Confirm the following: (Step 6.2.8) p SAT/ UNSAT | ||
(Step 6.2.10) | * Rod select pushbutton back lighted on STD: Observes both white Rod Map Display lights lit. | ||
* Select light illuminated for appropriate Control Rod at F Panel | |||
: 14. Step 6.2. 9 - "IF Control Rod is expected to p SAT I UNSAT double notch ... " STD: Determine step is NA per initial conditions. | |||
: 15. PLACE 4Sl, CONTROL ROD MOVEMENT p PASS/ FAIL switch to ROD IN position UNTIL ROD IN light STD: Places control rod illuminates. (Step 6.2.10) movement switch to the Rod In position. Observes rod start to move. | |||
Observes rod start to move. NRC March 2014 Exelon Generation When the rod is moved in, RPIS will fail initiating the alternate path. The applicant should determine rod position is unknown and references Nl-OP-5, Off Normal section to respond to the loss of rod position indication. | JPM S-6 Page 9 of 12 NRC March 2014 | ||
: 16. Verify indicating light NOT burnt out at F Panel. (Nl-OP-5 Step H.10.1) Cue: Another operator verified the light was not burnt out. Note: The applicant may make the determination that a light is not burnt out since all position indication for the rod was lost. 17. Notify Reactor Engineering. | |||
(Nl-OP-5 Step H.10.2) Cue: When contacted as Reactor Engineering, acknowledge report. 18. IF control rod lacks position indication, THEN perform the following: | Exelon Generation When the rod is moved in, RPIS will fail initiating the alternate path. The applicant should determine rod position is unknown and references Nl-OP-5, Off Normal section to respond to the loss of rod position indication. | ||
(Nl-OP-5 Step H.10.3) 18.a Insert control rod one notch. | : 16. Verify indicating light NOT burnt out at F p SAT I UNSAT Panel. | ||
p SAT I UNSAT | STD: Determines lights not (Nl-OP-5 Step H.10.1) burnt out. | ||
* ROD IN light illuminates for | Cue: Another operator verified the light was not burnt out. | ||
from RMCS timer lights. Observes next lower rod | Note: The applicant may make the determination that a light is not burnt out since all position indication for the rod was lost. | ||
* ROD OUT SETTLE light illuminates for position does not display. | : 17. Notify Reactor Engineering. p (Nl-OP-5 Step H.10.2) SAT I UNSAT STD: Reports loss of rod Cue: When contacted as Reactor position indication to Reactor Engineering, acknowledge report. Engineering | ||
: 18. IF control rod lacks position indication, THEN perform the following: | |||
(Nl-OP-5 Step H.10.3) 18.a Insert control rod one notch. p PASS/ FAIL STD: Momentarily places control rod movement switch to Rod In. | |||
JPM S-6 Page 10 of 12 NRC March 2014 | |||
Exelon Generation 18.b Confirm the following: p SAT I UNSAT STD: Observes proper response | |||
* ROD IN light illuminates for from RMCS timer lights. | |||
approximately three seconds. Observes next lower rod | |||
* ROD OUT SETTLE light illuminates for position does not display. | |||
approximately four seconds AFTER ROD IN light extinguishes. | approximately four seconds AFTER ROD IN light extinguishes. | ||
* Next lower even position illuminates | * Next lower even position illuminates . | ||
. IF control rod lacks position indication at more than one position AND position CANNOT be determined by other means, THEN perform following: | : 19. IF control rod lacks position indication at more than one position AND position CANNOT be determined by other means, THEN perform following: | ||
(Nl-OP-5 Step H.10.4) Fully insert control rod. p PASS/ FAIL STD: Places and holds control rod movement sw. to Rod In. Once control rod 02-31 is being fully inserted, provide the following Cue: Cue: Time compression. | (Nl-OP-5 Step H.10.4) | ||
The rod is fully inserted. | : 20. Fully insert control rod. p PASS/ FAIL STD: Places and holds control rod movement sw. to Rod In. | ||
Your task is complete, another operator will complete the remainder of the ARP actions. | Once control rod 02-31 is being fully inserted, provide the following Cue: | ||
Cue: Time compression. The rod is fully inserted. Your task is complete, another operator will complete the remainder of the ARP actions. | |||
Control Rod 02-31 is being fully inserted. | Control Rod 02-31 is being fully inserted. | ||
Page 11of12 NRC March 2014 | JPM S-6 Page 11of12 NRC March 2014 | ||
Exelon Generation JPM Handout Given: | |||
* The plant is online. | * The plant is online. | ||
* Weekly Control Rod exercising is in progress. | * Weekly Control Rod exercising is in progress. | ||
* The process computer is unavailable. | * The process computer is unavailable. | ||
* Nl-ST-Wl is complete through step 6.2.4. | * Nl-ST-Wl is complete through step 6.2.4. | ||
* No rods are expected to double notch. (Operators Name), Complete Nl-ST-Wl, starting at step 6.2.5. Begin with rod 02-35 and continue with the sequence outlined in attachment | * No rods are expected to double notch. | ||
(Operators Name), Complete Nl-ST-Wl, starting at step 6.2.5. Begin with rod 02-35 and continue with the sequence outlined in attachment 1. | |||
Document applicable rod movement information on attachment 1. | |||
0.0 | JPM S-6 Page 12 of 12 NRC March 2014 | ||
Si Developed By 03/17/14 Validated By Leigh Mason 8/21/14 Facility Reviewer Approximate Duration: | |||
20 minutes Documentation of Performance: | Exelon Generation Training Id: 2015 NRC JPM S-7 Revision: 0.0 | ||
==Title:== | |||
Place a Second RWCU Pump in Service Approvals: | |||
Si Developed By 03/17/14 Validated By Leigh Mason 8/21/14 Facility Reviewer Approximate Duration: 20 minutes Documentation of Performance: | |||
Performer: | Performer: | ||
Evaluator: | Evaluator: | ||
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | ||
Evaluators Signature: | Evaluators Signature: Date: | ||
Date: NRC 2015 JPM S-7 Page 1of9 March 2015 | NRC 2015 JPM S-7 Page 1of9 March 2015 | ||
;S:'r'Exelon Generation References | |||
: 1. Nl-OP-3, RWCU 2. NUREG 1123 K/A 204000 A4.01, (3.1/3.0) | ;S:'r'Exelon Generation References | ||
NRC 2015 JPM 5-7 Page 2 of 9 March 2015 Exelon Generationoo Instructor Information A. JPM Information | : 1. Nl-OP-3, RWCU | ||
: 1. Description | : 2. NUREG 1123 K/A 204000 A4.01, (3.1/3.0) | ||
: a. This JPM tests the operator's ability to operate the RWCU system. The operator will place a second RWCU pump in service and stabilize parameters. | NRC 2015 JPM 5-7 Page 2 of 9 March 2015 | ||
: b. This JPM is NOT considered alternate path. 2. Task Information: | |||
: a. Nl-204000-01039 | Exelon Generationoo Instructor Information A. JPM Information | ||
: b. K/A 204000 A4.01, (3.1/3.0) | : 1. Description | ||
: 3. Evaluation/ | : a. This JPM tests the operator's ability to operate the RWCU system. The operator will place a second RWCU pump in service and stabilize parameters. | ||
Task Criteria Perform Simulator No No Yes 4. Recommended Start Location | : b. This JPM is NOT considered alternate path. | ||
: a. Unit 1 Simulator NRC 2015 JPM S-7 Page 3 of 9 March 2015 Exelon Generation | : 2. Task Information: | ||
: 5. Simulator Setup (if required) | : a. Nl-204000-01039 | ||
: a. Initialize simulator to IC 164 b. Verify RWCU pump 12 is running c. Verify 33-39, Cleanup PCV 12 (HP) is in AUTO or BAL d. Verify 33-40, Cleanup Sys Flow, is in MANUAL e. Verify system flow is between 180 -220 x | : b. K/A 204000 A4.01, (3.1/3.0) | ||
: g. Verify RHX outlet temperature (F363) is displayed | : 3. Evaluation/ Task Criteria Perform Simulator No No Yes | ||
: h. Verify nuisance annunciators failed off: 1) Al-4-6 2) A2-3-2 3) A2-4-4 6. JPM Setup (if required) | : 4. Recommended Start Location | ||
: a. No steps need to be marked up. B. Read Before Every JPM Performance | : a. Unit 1 Simulator NRC 2015 JPM S-7 Page 3 of 9 March 2015 | ||
: 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. | |||
During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | Exelon Generation | ||
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | : 5. Simulator Setup (if required) | ||
Repositioning of devices will be simulated by discussion and acknowledged by my cues. C. Read Before Each Evaluated JPM 1. This evaluated JPM is a measure of your ability to perform this task independently. | : a. Initialize simulator to IC 164 | ||
: b. Verify RWCU pump 12 is running | |||
: c. Verify 33-39, Cleanup PCV 12 (HP) is in AUTO or BAL | |||
: d. Verify 33-40, Cleanup Sys Flow, is in MANUAL | |||
: e. Verify system flow is between 180 - 220 x 10 3 lbm/hr | |||
: f. Verify NRHX outlet temperature (F359) is displayed | |||
: g. Verify RHX outlet temperature (F363) is displayed | |||
: h. Verify nuisance annunciators failed off: | |||
: 1) Al-4-6 | |||
: 2) A2-3-2 | |||
: 3) A2-4-4 | |||
: 6. JPM Setup (if required) | |||
: a. No steps need to be marked up. | |||
B. Read Before Every JPM Performance | |||
: 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues. | |||
C. Read Before Each Evaluated JPM | |||
: 1. This evaluated JPM is a measure of your ability to perform this task independently. | |||
The CRS has determined that a verifier is not available and that additional verification will not be provided. | The CRS has determined that a verifier is not available and that additional verification will not be provided. | ||
NRC 2015 JPM 5-7 Page 4 of 9 March 2015 | NRC 2015 JPM 5-7 Page 4 of 9 March 2015 | ||
Generation | =~Exelon Generation Given: | ||
* The plant has scrammed | * The plant has scrammed | ||
* The Reactor Water Cleanup System is to be lined up to support further plant shutdown | * The Reactor Water Cleanup System is to be lined up to support further plant shutdown | ||
* NRHX outlet temperature (F359) and RHX outlet temperature (F363) are displayed on the R-time screen. Evaluator: | * NRHX outlet temperature (F359) and RHX outlet temperature (F363) are displayed on the R-time screen. | ||
Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), place a second Reactor Water Cleanup Pump in service in accordance with Nl-OP-3, section E.7. Establish system flow at 325-350 X 103 lbm/hr. Provide repeat back of initiating cue Cue: Acknowledge repeat back providing correction if necessary Obtain a copy of the reference procedure and review/ utilize the correct section of the | Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), place a second Reactor Water Cleanup Pump in service in accordance with Nl-OP-3, section E.7. Establish system flow at 325-350 X 103 lbm/hr. | ||
& limitations reviewed Section E.7.0 referenced NRC 2015 JPM S-7 Page 5 of 9 March 2015 | : 1. Provide repeat back of initiating cue SAT/ UNSAT p STD: Proper Cue: Acknowledge repeat back providing communications used correction if necessary | ||
: 2. Obtain a copy of the reference procedure and SAT I UNSAT review/ utilize the correct section of the p STD: Nl-OP-3 obtained procedure Precautions & limitations reviewed Section E.7.0 referenced NRC 2015 JPM S-7 Page 5 of 9 March 2015 | |||
Generation | Exelon Generation | ||
: | : 3. Monitor NON-REGENERATIVE HX outlet temp SAT I UNSAT and REGENERATIVE HX inlet temp (Step STD: Monitor NON-7.1) | ||
(Step 7.4. | REGERATIVE HX outlet temp (F359) and Cue: F359 and F363 are indicated on R- REGENERATIVE HX initial time display temp (F363) during the p performance of this section UNTIL system parameters stabilize, AND ensure temperatures do not exceed 120°F as indicated on computer points F359 and F363 | ||
: 4. Verify adequate margin exists to core SAT/ UNSAT thermal power limits to prevent exceeding STD: Verifies core power is design or administrative limits when a p less than 1842 MWth second cleanup pump is started and flow is raised (8-12 MWth) (Step 7.3) | |||
: 5. Verify closed 33-15 CLEANUP PUMP 1 SAT/ UNSAT DISCHARGE VALVE (Step 7.4.1) | |||
STD: Observes green light P on, red light off for 33-15 Cleanup Pump 1 Discharge Valve | |||
: 6. Adjust 33-40, CLEANUP SYS FLOW, using SAT/ UNSAT RMC-33-151 to establish cleanup system p STD: Verifies system flow flow between 180 x 10 3 and 220 x 10 3 lbm/hr on chart recorder 35-150 or (360 - 440 gpm) (Step 7.4.2) MA station 33-151 | |||
: 7. Verify Open 33-160, CLEANUP PUMP RECIRC SAT/ UNSAT VALVE 11 (Step 7.4.3) p STD: Observes red light on NRC 2015 JPM S-7 Page 6 of 9 March 2015 | |||
Generation | =~Exelon Generation@ | ||
: 11. When 33-15, CLEANUP PUMP 11 DISCHARGE VALVE, is fully open, adjust 33-40 using RMC-33-151, CLEANUP SYS FLOW, to maintain desired flow 250 x | : 8. Verify system pressure as indicated on PI- SAT/ UNSAT 35-131A is being maintained 80 - 100 psig p STD: Observes system (Step 7.4.4) pressure on PI-35-131A is 80 - 100 psig | ||
: 9. START Cleanup Pump 11 PASS/ FAIL (Step 7.4.5) | |||
STD: Rotates control switch for Cleanup Pump 11 CW to p start and observes red flag in window, red light on, green light off, and motor amps increase | |||
: 10. Perform simultaneously: (Step 7.4.6) lOa Slowly jog open 33-15, CLEANUP PUMP 11 PASS/ FAIL DISCHARGE VALVE STD: Rotates CLEANUP PUMP 11 DISCHARGE Note: This valve must be opened in small p VALVE control switch CW to increments to maintain proper system open, until red light is on pressure and green light is off lOb Verify system pressure maintained between SAT/ UNSAT 80 - 100 psig STD: Observes proper response of in-service PCV Note: System pressure may momentarily in AUTO OR adjusts in-p drop below 80 psig while the PCV responds service PCV in MANUAL while jogging open 33-15 to maintain system pressure 80 - 100 psig lOc Maintain pump discharge pressure less than SAT I UNSAT 1400 psig by opening 33-40, CLEANUP SYS STD: Adjusts RMC-33-151 FLOW, using RMC-33-151 p as required to maintain discharge pressure below 1400 psig NRC 2015 JPM S-7 Page 7 of 9 March 2015 | |||
=~Exelon Generation | |||
: 11. When 33-15, CLEANUP PUMP 11 DISCHARGE PASS/ FAIL VALVE, is fully open, adjust 33-40 using RMC-33-151, CLEANUP SYS FLOW, to STD: Rotates knob CW to raise system flow to maintain desired flow 250 x 10 3 -380 x 10 3 approximately 325-350 x lbm/hr (500 - 760 gpm) p 10 3 lbm/hr (Step 7.4.7) | |||
Note: 325-350 x 10 3 lbm/hr given in initiating cue Cue: Your task is complete. | |||
Second Reactor Water Cleanup Pump is in service and system flow adjusted to approximately 325-350 x 10 3 lbm/hr. | |||
NRC 2015 JPM S-7 Page 8 of 9 March 2015 | |||
Exelon Generation JPM Handout Given: | |||
* The plant has scrammed | * The plant has scrammed | ||
* The Reactor Water Cleanup System is to be lined up to support further plant shutdown | * The Reactor Water Cleanup System is to be lined up to support further plant shutdown | ||
* NRHX outlet temperature (F359) and RHX outlet temperature (F363) are displayed on the R-time screen. (Operators Name), place a second Reactor Water Cleanup Pump in service in accordance with Nl-OP-3, section E.7. Establish system flow at 325-350 X | * NRHX outlet temperature (F359) and RHX outlet temperature (F363) are displayed on the R-time screen. | ||
0.0 Title: Initiate Liquid Poison Injection, RWCU Fails To Isolate Approvals: | (Operators Name), place a second Reactor Water Cleanup Pump in service in accordance with Nl-OP-3, section E.7. Establish system flow at 325-350 X 10 3 lbm/hr. | ||
Signature I Printed Name Developed By 03/07/14 Validated By Pat O'Brien 8/21/14 Facility Reviewer | NRC 2015 JPM S-7 Page 9 of 9 March 2015 | ||
z/{J/a Approximate Duration: | Exelon Generation Training Id: 2015 NRC JPM S-8 Revision: 0.0 | ||
15 minutes Documentation of Performance: | |||
==Title:== | |||
Initiate Liquid Poison Injection, RWCU Fails To Isolate Approvals: | |||
Signature I Printed Name Developed By &~ham 03/07/14 Validated By Pat O'Brien 8/21/14 Facility Reviewer ~ | |||
_ _. ,. .,_______________ G_r_e~g_E_lk_i_ns z/{J/a | |||
~ | |||
Approximate Duration: 15 minutes Documentation of Performance: | |||
Performer: | Performer: | ||
Evaluator: | Evaluator: | ||
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | ||
Evaluators Signature: | Evaluators Signature: Date: | ||
Date: NRC 2015 JPM 5-8 Page 1of9 March 2015 | NRC 2015 JPM 5-8 Page 1of9 March 2015 | ||
Generation | =:r-Exelon Generation References | ||
: 5. Simulator Setup (if required) | : 1. Nl-EOP-HC Attachment 10 | ||
: a. The reactor is in a failure to scram b. Initialize simulator to IC 165 c. Verify the following malfunctions are inserted | : 2. NUREG 1123 K/A 211001 Al.08, (3.7/3.8) | ||
NRC 2015 JPM S-8 Page 2 of 9 March 2015 | |||
Exelon Generation Instructor Information A. JPM Information | |||
: 1. Description | |||
: a. This JPM tests the operator's ability to initiate liquid poison and verify proper isolations occur. | |||
: b. This JPM is not considered alternate path. | |||
: 2. Task Information: | |||
: a. Nl-211000-01006 | |||
: b. K/A 262001 211001 Al.08, (3.7/3.8) | |||
: 3. Evaluation / Task Criteria Perform Simulator No No Yes | |||
: 4. Recommended Start Location | |||
: a. Unit 1 Simulator NRC 2015 JPM S-8 Page 3 of 9 March 2015 | |||
=~Exelon Generation | |||
: 5. Simulator Setup (if required) | |||
: a. The reactor is in a failure to scram | |||
: b. Initialize simulator to IC 165 | |||
: c. Verify the following malfunctions are inserted | |||
* RD33A, RD33C, and RD33E at position 48 | * RD33A, RD33C, and RD33E at position 48 | ||
* RD33B and RD33D at position 06 | * RD33B and RD33D at position 06 | ||
* CU12 and CU13 to establish RWCU isolation failure d. Verify Mode Switch in shutdown | * CU12 and CU13 to establish RWCU isolation failure | ||
: e. Verify ADS bypassed | : d. Verify Mode Switch in shutdown | ||
: f. Allow conditions to stabilize. | : e. Verify ADS bypassed | ||
: 6. JPM Setup (if required) | : f. Allow conditions to stabilize. | ||
: a. No steps need to be marked up. B. Read Before Every l PM Perform a nee 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. | : 6. JPM Setup (if required) | ||
During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | : a. No steps need to be marked up. | ||
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | B. Read Before Every l PM Perform a nee | ||
Repositioning of devices will be simulated by discussion and acknowledged by my cues. C. Read Before Each Evaluated JPM 1. This evaluated JPM is a measure of your ability to perform this task independently. | : 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues. | ||
C. Read Before Each Evaluated JPM | |||
: 1. This evaluated JPM is a measure of your ability to perform this task independently. | |||
The CRS has determined that a verifier is not available and that additional verification will not be provided. | The CRS has determined that a verifier is not available and that additional verification will not be provided. | ||
NRC 2015 JPM S-8 Page 4 of 9 March 2015 | NRC 2015 JPM S-8 Page 4 of 9 March 2015 | ||
Exelon Generation Given: | |||
* The plant was operating at 100% power | * The plant was operating at 100% power | ||
* A failure to scram has occurred Evaluator: | * A failure to scram has occurred Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), inject Liquid Poison into the Reactor Vessel with Liquid Poison pump 11 in accordance with Nl-EOP-HC, Attachment 10. | ||
Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), inject Liquid Poison into the Reactor Vessel with Liquid Poison pump 11 in accordance with Nl-EOP-HC, Attachment | : 1. Provide repeat back of initiating cue SAT I UNSAT I NA p STD: Proper Cue: Acknowledge repeat back providing communications used correction if necessary | ||
: | : 2. Obtain a copy of the reference procedure and SAT I UNSAT I NA review/ utilize the correct section of the p STD: Nl-EOP-HC, procedure Attachment 10 obtained. | ||
: 3. Place Liquid Poison System keylock selector PASS/ FAIL switch to SYS 11 (Step 1.0) p STD: Keylock selector switch is rotated CW to SYS 11 NRC 2015 JPM S-8 Page 5 of 9 March 2015 | |||
: 4. Confirm: | |||
(Step 2.0) | Exelon Generation | ||
* Both explosive valves fire | : 4. Confirm: (Step 2.0) | ||
SAT/ UNSAT | |||
* Both explosive valves fire STD: | |||
* Observes squib valves 11 and 12 continuity lights off SAT/ UNSAT | * Observes squib valves 11 and 12 continuity lights off | ||
* Observes Liquid Poison pump 11 red light ON, green light OFF, amps and pressure rise PASS/ FAIL | * Liquid Poison pump 11 Starts SAT/ UNSAT | ||
* Diagnoses failure of RWCU to isolate: | * Observes Liquid Poison p pump 11 red light ON, green light OFF, amps and pressure rise PASS/ FAIL | ||
RWCU system isolation valves remain open with green lights OFF, red lights ON, RWCU pump in service SAT I UNSAT STD: Proper communication used OPS-01) March 2015 | * RWCU System isolates | ||
=="'Exelon Generation | * Diagnoses failure of Note: RWCU will fail to isolate RWCU to isolate: RWCU system isolation valves remain open with green lights OFF, red lights ON, RWCU pump in service | ||
: 6 | : 5. Notify CRS that the RWCU system failed to SAT I UNSAT isolate p STD: Proper communication used (GAP-Role Play: Acknowledge RWCU System OPS-01) failed to isolate NRC 2015 JPM S-8 Page 6 of 9 March 2015 | ||
Provide close signal to both valves below at H panel (Step H.11.1) | |||
* Close 33-02R | =="'Exelon Generation | ||
* Close 33-04 Secure all operating cleanup pumps (Step H.11.2) Open ONE of the following valves | : 6. IF RWCU does NOT automatically isolate SAT/ UNSAT THEN manually isolate the RWCU system STD: Refers to Nl-OP-3, IAW Nl-OP-3 Section H.11 Note: The Operator may immediately close RWCU isolation valves 33-0lR, 33-02R and p 33-04R and/or trip the running RWCU pump. | ||
* 33-10, Cleanup to Waste Disposal BV | This satisfies JPM steps 7, 8 and/or 12, and is acceptable to be performed prior to referencing the procedure, as it is a backup to a failed automatic operation. | ||
* 33-11, Cleanup to Condenser BV (Step H.11.3) | : 7. Provide close signal to both valves below at PASS/ FAIL H panel (Step H.11.1) p STD: Closes 33-02R & 33-04 by rotating individual | ||
: 10. Marks step 11.4, N/A, rapid depressurization NOT required | * Close 33-02R control switches CCW | ||
: 11. | * Close 33-04 | ||
(Step H.11.6) STD: Provides close signal p at H Panel to 33-0lR, CU Return Isolation Valve 1 (inside), | : 8. Secure all operating cleanup pumps SAT/ UNSAT (Step H.11.2) p STD: Secures RWCU pump 12 by rotating control switch CCW to STOP | ||
by rotating control switch CCW Adjust in-service PCV AND 33-165, Cleanup SAT/ UNSAT to Cond & Waste Flow, as required to maintain Cleanup system pressure less than | : 9. Open ONE of the following valves SAT/ UNSAT | ||
* IV-33-02R p STD: Verifies closed the | * 33-10, Cleanup to Waste Disposal STD: Opens ONE of the BV p listed valves using common | ||
* IV-33-04 | * 33-11, Cleanup to Condenser BV control switch (Step H.11.3) | ||
Role Play: When asked, state that Rapid Depressurization is NOT required and that RWCU system is to remain pressurized | |||
: 10. Marks step 11.4, N/A, rapid depressurization SAT/ UNSAT NOT required p STD: Step 11.4 marked N/A NRC 2015 JPM S-8 Page 7 of 9 March 2015 | |||
Exelon Generation | |||
: 11. If high pressure system is to remain SAT/ UNSAT pressurized, THEN close 33-41, AO Blocking p STD: Closes 33-41, AO Valve. | |||
Blocking Valve by rotating (Step H.11.5) control switch CCW | |||
: 12. Provide close signal at H Panel to 33-0lR, CU PASS/ FAIL Return Isolation Valve 1 (inside) (Step H.11.6) STD: Provides close signal p at H Panel to 33-0lR, CU Return Isolation Valve 1 (inside), by rotating control switch CCW | |||
: 13. Adjust in-service PCV AND 33-165, Cleanup SAT/ UNSAT to Cond & Waste Flow, as required to STD: Adjusts in-service maintain Cleanup system pressure less than PCV AND 33-165, Cleanup 110 psig AND minimize reject flow p to Cond & Waste Flow, as (Step H.11.7) required to maintain Cleanup system pressure less than 110 psig AND minimize reject flow | |||
: 14. Verify closed the following valves SAT I UNSAT (Step H.11.8) | |||
* IV-33-02R p STD: Verifies closed the listed valves (green light | |||
* IV-33-04 ON, red light OFF) | |||
* IV-33-0lR Cue: Your task is complete. | * IV-33-0lR Cue: Your task is complete. | ||
Liquid Poison pump 11 injecting into the Reactor Vessel and Reactor Water Cleanup isolated. | Liquid Poison pump 11 injecting into the Reactor Vessel and Reactor Water Cleanup isolated. | ||
NRC 2015 JPM S-8 Page 8 of 9 March 2015 Exelon Generation | NRC 2015 JPM S-8 Page 8 of 9 March 2015 | ||
Exelon Generation JPM Handout Given: | |||
* The plant was operating at 100% power | * The plant was operating at 100% power | ||
* A failure to scram has occurred (Operators Name), inject Liquid Poison into the Reactor Vessel with Liquid Poison pump 11 in accordance with Nl-EOP-HC, Attachment | * A failure to scram has occurred (Operators Name), inject Liquid Poison into the Reactor Vessel with Liquid Poison pump 11 in accordance with Nl-EOP-HC, Attachment 10. | ||
NRC 2015 JPM 5-8 Page 9 of 9 March 2015 | |||
0.0 Title: Air Start the Diesel Fire Pump Approvals: | |||
Si nature Printed e Developed By Paul Isham 03/18/14 Validated By Leigh Mason 8/19/14 Facility Reviewer Approximate Duration: | Exelon Generation Training Id: 2015 NRC Plant P-1 Revision: 0.0 | ||
20 minutes Documentation of Performance: | |||
==Title:== | |||
Air Start the Diesel Fire Pump Approvals: | |||
Si nature Printed e Developed By Paul Isham 03/18/14 Validated By Leigh Mason 8/19/14 Facility Reviewer Approximate Duration: 20 minutes Documentation of Performance: | |||
Performer: | Performer: | ||
Evaluator: | Evaluator: | ||
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | ||
Evaluators Signature: | Evaluators Signature: Date: | ||
Date: NRC JPM P-1 Page 1 of 7 March 2015 Exelon Generation References | NRC JPM P-1 Page 1 of 7 March 2015 | ||
: 1. N 1-0P-21A, Fire Protection System -Water 2. NUREG 1123 K/A 286000, A3.01 (3.4/3.4) | |||
NRC JPM P-1 Page 2 of 7 March 2015 | Exelon Generation References | ||
: 1. N 1-0P-21A, Fire Protection System - Water | |||
: 2. NUREG 1123 K/A 286000, A3.01 (3.4/3.4) | |||
NRC JPM P-1 Page 2 of 7 March 2015 | |||
=~Exelon Generation Instructor Information A. JPM Information | |||
: 1. Description | |||
: a. This JPM tests the operator's ability to locally start the diesel fire pump with a loss of control power. | |||
: b. This JPM is not considered alternate path | |||
: 2. Task Information: | |||
: a. Nl-286000-04039 | |||
: b. K/ A 286000, A3.0l (3.4/3.4) | |||
: 3. Evaluation/ Task Criteria Simulate Plant No No Yes | |||
: 4. Recommended Start Location | |||
: a. Unit 1 Turbine Building | |||
: 5. JPM Setup (if required) | |||
: a. Provide a copy of Nl-OP-21A NRC JPM P-1 Page 3 of 7 March 2015 | |||
=:rExelon Generation B. Read Before Every JPM Performance | |||
: 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues. | |||
C. Read Before Each Evaluated JPM | |||
: 1. This evaluated JPM is a measure of your ability to perform this task independently. | |||
=:rExelon Generation B. Read Before Every JPM Performance | |||
: 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. | |||
During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | |||
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | |||
Repositioning of devices will be simulated by discussion and acknowledged by my cues. C. Read Before Each Evaluated JPM 1. This evaluated JPM is a measure of your ability to perform this task independently. | |||
The CRS has determined that a verifier is not available and that additional verification will not be provided. | The CRS has determined that a verifier is not available and that additional verification will not be provided. | ||
NRC JPM P-1 Page 4 of 7 March 2015 | NRC JPM P-1 Page 4 of 7 March 2015 | ||
Exelon Generation Given: | |||
* The plant is shutdown | * The plant is shutdown | ||
* A total loss of DC power has occurred Evaluator: | * A total loss of DC power has occurred Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), start the diesel fire pump per Nl-OP-21A, Section H.6 | ||
Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), start the diesel fire pump per Nl-OP-21A, Section H.6 Provide repeat back of initiating cue SAT/ UNSAT Cue: Acknowledge repeat back providing | : 1. Provide repeat back of initiating cue SAT/ UNSAT p | ||
Cue: Acknowledge repeat back providing STD: Proper communications used correction if necessary. | |||
: 2. Obtain a copy of the reference procedure and SAT/ UNSAT review / utilize the correct section of the procedure p STD: Nl-OP-21A obtained. Precautions and limitations reviewed. | |||
Section H.6 referenced. | Cue: Step 6.1 is complete Section H.6 referenced. | ||
Place Diesel Fire Pump Control Switch to SAT I UNSAT OFF. | : 3. Place Diesel Fire Pump Control Switch to SAT I UNSAT OFF. | ||
s STD: Manually opens 100-1211 by rotating override lever CW NRC JPM P-1 Page 5 of 7 March 2015 Exelon Generation The Diesel Fire Pump has been manually started. | STD: Local Control s Switch rotated CW to OFF in Diesel Fire Pump Room | ||
NRC JPM P-1 Page 6 of 7 March 2015 | : 4. Manually open 100-1211, Solenoid Operated PASS/ FAIL Inlet Valve, to the Woodward Governor. | ||
=:r-Exelon Generation | s STD: Manually opens 100-1211 by rotating override lever CW NRC JPM P-1 Page 5 of 7 March 2015 | ||
~, Exelon Generation The Diesel Fire Pump has been manually started. | |||
NRC JPM P-1 Page 6 of 7 March 2015 | |||
=:r-Exelon Generation JPM Handout Given: | |||
* The plant is shutdown | * The plant is shutdown | ||
* A total loss of DC power has occurred (Operators Name), start the diesel fire pump per Nl-0P-21A, Section H.6 Page 7 of 7 March 2015 | * A total loss of DC power has occurred (Operators Name), start the diesel fire pump per Nl-0P-21A, Section H.6 NRC JPM P-1 Page 7 of 7 March 2015 | ||
Generation Training Id: 2015 NRC Plant P-2 Revision: | =~Exelon Generation Training Id: 2015 NRC Plant P-2 Revision: 0.0 OATC Actions For Control Room Evacuation {Nl-SOP-21.2) | ||
0.0 OATC Actions For Control Room Evacuation | |||
{Nl-SOP-21.2) | ==Title:== | ||
Title: {Alternate Path) Approvals: | {Alternate Path) | ||
Developed By Validated By 08/19/2014 Facility Reviewer z;f 1/1;--25 minutes Documentation of Performance: | Approvals: | ||
Developed By Validated By ~~~~~~~~~~~~L_e~ig~h~M_a_so~n 08/19/2014 Facility Reviewer z;f 1/1;-- | |||
25 minutes Documentation of Performance: | |||
Performer: | Performer: | ||
Evaluator: | Evaluator: | ||
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments: | ||
Evaluators Signature: | Evaluators Signature: Date: | ||
Date: NRC JPM P-2 Page 1of10 March 2015 Exelon Generation References | NRC JPM P-2 Page 1of10 March 2015 | ||
: 1. Nl-SOP-21.2 | |||
Exelon Generation References | |||
: 1. Nl-SOP-21.2 | |||
: 2. NUREG 1123 K/A 295016 AAl.04 (3.1/3.2) | : 2. NUREG 1123 K/A 295016 AAl.04 (3.1/3.2) | ||
NRC JPM P-2 Page 2 of 10 March 2015 | NRC JPM P-2 Page 2 of 10 March 2015 | ||
Instructor Information A. JPM Information | =~Exelon Generation~ | ||
: 1. Description | Instructor Information A. JPM Information | ||
: | : 1. Description | ||
The actions are primarily associated with local operation of electrical distribution components. | : a. This JPM tests the operator's ability to execute OATC actions for a control room abandonment. The actions are primarily associated with local operation of electrical distribution components. | ||
: b. This JPM is considered alternate path because after reporting to the Emergency Diesel Generators, a loss of offsite power will occur causing both EDGs to load. The operator will be required to execute override actions for the loss of offsite power and the subsequent Hot EDG. Task Information: | : b. This JPM is considered alternate path because after reporting to the Emergency Diesel Generators, a loss of offsite power will occur causing both EDGs to load. | ||
: a. Nl-296000-01003-01 | The operator will be required to execute override actions for the loss of offsite power and the subsequent Hot EDG. | ||
: 2. Task Information: | |||
: a. Nl-296000-01003-01 | |||
: b. K/A 295016 AAl.04 (3.1/3.2) | : b. K/A 295016 AAl.04 (3.1/3.2) | ||
Evaluation I Task Criteria Simulate Plant No Yes Yes Recommended Start Location | : 3. Evaluation I Task Criteria Simulate Plant No Yes Yes | ||
: a. Unit 1 Turbine Building JPM Setup (if required) | : 4. Recommended Start Location | ||
: a. Provide a copy of Nl-SOP-21.2 NRC JPM P-2 Page 3 of 10 March 2015 | : a. Unit 1 Turbine Building | ||
=:r-Exelon Generation B. Read Before Every JPM Performance | : 5. JPM Setup (if required) | ||
: 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. | : a. Provide a copy of Nl-SOP-21.2 NRC JPM P-2 Page 3 of 10 March 2015 | ||
During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | |||
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | =:r-Exelon Generation B. Read Before Every JPM Performance | ||
Repositioning of devices will be simulated by discussion and acknowledged by my cues. C. Read Before Each Evaluated JPM 1. This evaluated JPM is a measure of your ability to perform this task independently. | : 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues. | ||
C. Read Before Each Evaluated JPM | |||
: 1. This evaluated JPM is a measure of your ability to perform this task independently. | |||
The CRS has determined that a verifier is not available and that additional verification will not be provided. | The CRS has determined that a verifier is not available and that additional verification will not be provided. | ||
NRC JPM P-2 Page 4 of 10 March 2015 | NRC JPM P-2 Page 4 of 10 March 2015 | ||
Generation | =~Exelon Generation Given: | ||
* You are the OATC. | * You are the OATC. | ||
* A Control Room Evacuation has been ordered due to a fire. | * A Control Room Evacuation has been ordered due to a fire. | ||
Line 1,180: | Line 1,639: | ||
* Feedwater Pump 13 could NOT be disengaged from the control room. | * Feedwater Pump 13 could NOT be disengaged from the control room. | ||
* Powerboard 11 and 12 are energized. | * Powerboard 11 and 12 are energized. | ||
Evaluator: | Evaluator: Ask trainee if he/she has any questions after presenting initial conditions | ||
Ask trainee if he/she has any questions after presenting initial conditions | {Operators Name), perform OATC actions of Nl-SOP-21.2, Control Room Evacuation, starting at*." | ||
{Operators Name), perform OATC actions of Nl-SOP-21.2, Control Room Evacuation, starting at*." Provide repeat back of initiating cue SAT I UNSAT Cue: Acknowledge repeat back providing | : 1. Provide repeat back of initiating cue SAT I UNSAT p | ||
Cue: Acknowledge repeat back providing STD: Proper communications used correction if necessary. | |||
{TB EL 300') p | : 2. Obtain a copy of the reference procedure and SAT/ UNSAT review/ utilize the correct section of the p STD: Nl-SOP-21.2 procedure obtained Section 'C' referenced | ||
: 3. IF Main Turbine NOT tripped, WHEN Reactor SAT/ UNSAT has been scrammed, THEN Trip Main Turbine by rotating AND pulling MASTER TRIP at STD: Determines step is p N/A per initial conditions Front Standard {TB EL 300') | |||
NRC JPM P-2 Page 5 of 10 March 2015 | |||
=~Exelon Generation | |||
: 4. IF Feedwater Pump 13 NOT disengaged, PASS/ FAIL THEN Disengage Feedwater Pump 13 locally STD: FWP actuator Note: Once the Candidate has identified the junction boxes identified. | |||
FWP actuator junction boxes, relocate to a Stop buttons depressed. | |||
quieter, lower dose area. Present the Candidate with a picture of the controls s | |||
including the stop button and have them show what they would do. | |||
Cue: Indicated button pushed. The actuator motors have been stopped. | |||
: 5. Proceed to PB 11 and 12 SAT I UNSAT p | |||
STD: Travels to PB 11 and 12 (TB 261' South) | |||
: 6. Is Offsite Power available (voltage on PB SAT/ UNSAT 11/12)? | |||
STD: Determines offsite P power is available per initial conditions or by checking volt meters on PB 11/12. | |||
: 7. At PB 11 and 12, verify the following: | |||
7a Breaker R122 open SAT/ UNSAT STD: Breaker R122 Cue: Breaker R122 green light ON and red s verified open by light OFF. | |||
observing local indications 7b Breaker R113 open SAT/ UNSAT STD: Breaker Rl 13 Cue: Breaker R113 green light ON and red s verified open by light OFF. | |||
observing local indications NRC JPM P-2 Page 6 of 10 March 2015 | |||
Exelon Generation NRC JPM P-2 Page 7 of 10 March 2015 | |||
Exelon Generation~ | |||
: 9. IF D/G loaded due to Loss of Offsite Power (LOOP), THEN: | |||
9a Place D/G Control in LOCAL PASS/ FAIL Note: D/G Control switch is labeled s STD: D/G 103 Control switch placed in LOCAL "REMOTE AUTO" and "LOCAL START". | |||
START 9b Monitor D/G voltage AND HOT ENGINE light SAT/ UNSAT p STD: D/G 103 voltage Cue: DG 103 HOT ENGINE light is AND HOT ENGINE light extinguished, DG 103 voltage is normal. | |||
monitored | |||
: 10. Proceed to Diesel Generator/PB rooms (TB SAT I UNSAT 261') | |||
: 9. IF D/G loaded due to Loss of Offsite Power (LOOP), THEN: 9a Place D/G Control in LOCAL PASS/ FAIL Note: D/G Control switch is labeled s STD: D/G 103 Control "REMOTE AUTO" and "LOCAL START". | p STD: Travels to Diesel Generator Room 102 (TB 261' East) | ||
: 10. Proceed to Diesel Generator/PB rooms (TB SAT I UNSAT 261') p STD: Travels to Diesel Generator Room 102 (TB 261' East) 11. IF D/G loaded due to Loss of Offsite Power (LOOP), THEN: lla Place D/G Control in LOCAL PASS/ FAIL Note: D/G Control switch is labeled s STD: D/G 102 Control "REMOTE AUTO" and "LOCAL START". | : 11. IF D/G loaded due to Loss of Offsite Power (LOOP), THEN: | ||
: 12. IF D/G Control Circuit damage detected SAT/ UNSAT as indicated by HOT ENGINE light s STD: CRS notified illuminated, THEN notify CRS and shutdown EDG 102 as follows: | lla Place D/G Control in LOCAL PASS/ FAIL Note: D/G Control switch is labeled s STD: D/G 102 Control switch placed in LOCAL "REMOTE AUTO" and "LOCAL START". | ||
NRC JPM P-2 Page 8 of 10 March 2015 | START llb Monitor D/G voltage AND HOT ENGINE light SAT I UNSAT p STD: D/G 102 voltage Cue: DG 102 HOT ENGINE light is LIT, DG AND HOT ENGINE light 102 voltage is normal. | ||
monitored | |||
: 12. IF D/G Control Circuit damage detected SAT/ UNSAT as indicated by HOT ENGINE light s STD: CRS notified illuminated, THEN notify CRS and shutdown EDG 102 as follows: | |||
NRC JPM P-2 Page 8 of 10 March 2015 | |||
Generation Cue: Your task is complete. | =~Exelon Generation Cue: Your task is complete. | ||
OATC actions of Nl-SOP-21.2 are complete. | OATC actions of Nl-SOP-21.2 are complete. | ||
NRC JPM P-2 Page 9 of 10 March 2015 | NRC JPM P-2 Page 9 of 10 March 2015 | ||
Generation | =~Exelon Generation JPM Handout Given: | ||
* You are the OATC. | * You are the OATC. | ||
* A Control Room Evacuation has been ordered due to a fire. | * A Control Room Evacuation has been ordered due to a fire. | ||
Line 1,207: | Line 1,688: | ||
* The Main Turbine has just been tripped. | * The Main Turbine has just been tripped. | ||
* Feedwater Pump 13 could NOT be disengaged from the control room. | * Feedwater Pump 13 could NOT be disengaged from the control room. | ||
* Powerboard 11 and 12 are energized. | * Powerboard 11 and 12 are energized. | ||
(Operators Name), perform OATC actions of Nl-SOP-21.2, Control Room Evacuation, starting at *." Page 10 of 10 March 2015 | (Operators Name), perform OATC actions of Nl-SOP-21.2, Control Room Evacuation, starting at * . " | ||
=:r-Exelon Generation Training Id: 2015 NRC JPM P-3 Revision: | NRC JPM P-2 Page 10 of 10 March 2015 | ||
0.0 | |||
Si nature Printed Name Date Developed By /Paul Isham 03/07/2014 Validated By 08/19/2014 Facility Reviewer bl,Gb f Lf<'IJ<: | =:r-Exelon Generation Training Id: 2015 NRC JPM P-3 Revision: 0.0 Emergency Condenser Initiation From the Remote Shutdown Panel | ||
7 Approximate Duration: | |||
15 minutes Documentation of Performance: | ==Title:== | ||
{Alternate Path) | |||
Approvals: | |||
Si nature Printed Name Date Developed By ~ | |||
/~/Paul Isham 03/07/2014 Validated By -----------~/_L_e~ig~h_M_a_so~n 08/19/2014 Facility Reviewer ~ bl,Gb f Lf<'IJ<: | |||
7 Approximate Duration: 15 minutes Documentation of Performance: | |||
Performer: | Performer: | ||
Evaluator: | Evaluator: | ||
Start Time: Stop Time: Completion Time Grade: Pass I Fail Comments: | Start Time: Stop Time: Completion Time Grade: Pass I Fail Comments: | ||
Evaluators Signature: | Evaluators Signature: ---------- | ||
---------- | Date: | ||
Date: NRC 2015 JPM P-3 Page 1of8 March 2015 | NRC 2015 JPM P-3 Page 1of8 March 2015 | ||
Generation Instructor Information A. JPM Information | =:r-Exelon Generation References | ||
: 1. Description | : 1. Nl-SOP-21.2, Attachment 20 | ||
: a. This JPM tests the operator's ability to initiate Emergency Condensers from outside the control room in the event of Control Room Abandonment. | : 2. NUREG 1123 K/A 295016 AAl.09, (4.0/4.0) | ||
: b. This JPM is considered alternate path due to a failure of the automatic EC level control. | NRC 2015 JPM P-3 Page 2 of 8 March 2015 | ||
This requires executing an override step that would not normally be necessary to complete the task. 2. Task Information: | |||
: a. Nl-207000-01019 | =~Exelon Generation Instructor Information A. JPM Information | ||
: b. K/A 295016 AAl.09, (4.0/4.0) | : 1. Description | ||
: 3. Evaluation/ | : a. This JPM tests the operator's ability to initiate Emergency Condensers from outside the control room in the event of Control Room Abandonment. | ||
Task Criteria Perform Plant No Yes Yes 4. Recommended Start Location | : b. This JPM is considered alternate path due to a failure of the automatic EC level control. This requires executing an override step that would not normally be necessary to complete the task. | ||
: a. Unit 1 Turbine Building Elevation 261' 5. Simulator Setup (if required) | : 2. Task Information: | ||
: a. N/A 6. JPM Setup (if required) | : a. Nl-207000-01019 | ||
: b. K/A 295016 AAl.09, (4.0/4.0) | |||
: 3. Evaluation/ Task Criteria Perform Plant No Yes Yes | |||
: 4. Recommended Start Location | |||
: a. Unit 1 Turbine Building Elevation 261' | |||
: 5. Simulator Setup (if required) | |||
: a. N/A | |||
: 6. JPM Setup (if required) | |||
: a. Provide a copy of Nl-SOP-21.2, Control Room Evacuation. | : a. Provide a copy of Nl-SOP-21.2, Control Room Evacuation. | ||
NRC 2015 JPM P-3 Page 3 of 8 March 2015 Exelon Generation B. Read Before Every JPM Performance | NRC 2015 JPM P-3 Page 3 of 8 March 2015 | ||
: 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. | |||
During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | ~- Exelon Generation B. Read Before Every JPM Performance | ||
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. | : 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues. | ||
Repositioning of devices will be simulated by discussion and acknowledged by my cues. C. Read Before Each Evaluated JPM 1. This evaluated JPM is a measure of your ability to perform this task independently. | C. Read Before Each Evaluated JPM | ||
: 1. This evaluated JPM is a measure of your ability to perform this task independently. | |||
The CRS has determined that a verifier is not available and that additional verification will not be provided. | The CRS has determined that a verifier is not available and that additional verification will not be provided. | ||
NRC 2015 JPM P-3 Page 4 of 8 March 2015 | NRC 2015 JPM P-3 Page 4 of 8 March 2015 | ||
=~Exelon Generation~ | |||
Given: | |||
* A control room evacuation has occurred | * A control room evacuation has occurred | ||
* All control room actions were completed | * All control room actions were completed | ||
Line 1,253: | Line 1,746: | ||
* Offsite Power is available | * Offsite Power is available | ||
* FW and CRD are available | * FW and CRD are available | ||
* Other operators are performing the manual vessel isolation and removing ERV fuses Evaluator: | * Other operators are performing the manual vessel isolation and removing ERV fuses Evaluator: Ask trainee if he/she has any questions a~er presenting initial conditions (Operators Name), Place Emergency Cooling Loop 11 in service in accordance with Nl-SOP-21.2 CRS/CRO actions and commence normal RPV cooldown. | ||
Ask trainee if he/she has any questions presenting initial conditions (Operators Name), Place Emergency Cooling Loop 11 in service in accordance with Nl-SOP-21.2 CRS/CRO actions and commence normal RPV cooldown. | : 1. Provide repeat back of initiating cue SAT I UNSAT STD: Proper p communications used Cue: Acknowledge repeat back providing correction if necessary | ||
Provide repeat back of initiating cue SAT I UNSAT STD: Proper Cue: Acknowledge repeat back providing | : 2. Obtain a copy of the reference procedure and SAT/ UNSAT review/ utilize the correct section of the p STD: Nl-SOP-21.2 obtained and reviewed. | ||
obtained and reviewed. | procedure. | ||
Go to Remote Shutdown Panel #11 SAT I UNSAT p Cue: The EC System has NOT isolated | : 3. Go to Remote Shutdown Panel #11 SAT I UNSAT p | ||
STD: Proceed to RSP 11, Cue: The EC System has NOT isolated TB 250' South NRC 2015 JPM P-3 Page 5 of 8 March 2015 | |||
Generation | =::'"Exelon Generation | ||
: 10. Verify M is displayed SAT I UNSAT Cue: M is illuminated s STD: Observe "M" is illuminated on status panel 11. Control level by depressing arrows on key PASS/FAIL pad STD: Level is raised in | : 4. Place the Channel 11 CONTROL TRANSFER PASS/FAIL keylock switch in EMERG position to transfer s STD: Rotate the control control to the RSP. | ||
: 12. Report that # 11 EC Condenser in service and SAT I UNSAT EC shell level control is in manual. p STD: Proper communications used. (GAP-OPS-01) | switch to the emergency position | ||
: 5. Verify open 39-07 and 39-09 SAT I UNSAT Cue: 39-07 and 39-09 are open (if s STD: Observe red lights on, green lights off. | |||
necessary). | |||
: 6. Control RPV cooldown by cycling open and PASS/FAIL closed 39-05, EMERGENCY CONDENSER STD: Rotate control COND RTN IV 11 switch for valve 39-05 s CW to the open position, Cue: 39-05 is open. Reactor Pressure is 900 observe red light psig and slowly lowering. RPV water level is energized, green light out. | |||
72" and stable. | |||
Note: The following cue indicates that AUTO shell level control has failed. | |||
Cue: If the candidate references EC shell water level indicator, inform them that EC shell water level is 5.5' and slowly lowering | |||
: 7. Place EC 111/112 Level Control Transfer PASS/FAIL Switch to Local s STD: Rotate control switch CW to the Local position. | |||
: 8. Verify AUTO control by observing "A" on SAT/ UNSAT status panel STD: Observe "A" s illuminated on status Cue: EC shell water level is 5.0' and slowly panel lowering. | |||
: 9. Depress A/M key pad PASS/FAIL S STD: Manual mode selected by depressing the A/M key pad NRC 2015 JPM P-3 Page 6 of 8 March 2015 | |||
=~Exelon Generation | |||
: 10. Verify M is displayed SAT I UNSAT Cue: M is illuminated s STD: Observe "M" is illuminated on status panel | |||
: 11. Control level by depressing arrows on key PASS/FAIL pad STD: Level is raised in Cue: EC Condenser Shell is 6.4' and stable. | |||
s the EC Condenser Shell by depressing the key Reactor Pressure is 850 psig and slowly pad arrows. | |||
lowering. | |||
: 12. Report that # 11 EC Condenser in service and SAT I UNSAT EC shell level control is in manual. | |||
p STD: Proper communications used. | |||
(GAP-OPS-01) | |||
Cue: Your task is complete. | Cue: Your task is complete. | ||
Emergency Cooling Loop 11 placed in service in accordance with Nl-SOP-21.2, and EC Shell level is controlled in manual. NRC 2015 JPM P-3 Page 7 of 8 March 2015 | Emergency Cooling Loop 11 placed in service in accordance with Nl-SOP-21.2, and EC Shell level is controlled in manual. | ||
NRC 2015 JPM P-3 Page 7 of 8 March 2015 | |||
Generation | =~Exelon Generation JPM Handout Given: | ||
* A control room evacuation has occurred | * A control room evacuation has occurred | ||
* All control room actions were completed | * All control room actions were completed | ||
Line 1,282: | Line 1,789: | ||
* FW and CRD are available | * FW and CRD are available | ||
* Other operators are performing the manual vessel isolation and removing ERV fuses (Operators Name), Place Emergency Cooling Loop 11 in service in accordance with Nl-SOP-21.2 CRS/CRO actions and commence normal RPV cooldown. | * Other operators are performing the manual vessel isolation and removing ERV fuses (Operators Name), Place Emergency Cooling Loop 11 in service in accordance with Nl-SOP-21.2 CRS/CRO actions and commence normal RPV cooldown. | ||
Page 8 of 8 March 2015 | NRC 2015 JPM P-3 Page 8 of 8 March 2015 | ||
=~Exelon Generation Copy of __ | |||
Training Id: NRC 2015 Scenario 2 Revision: 0.1 Recirc Flow Unit Failure, EC Initiation, Fuel Failure, Un-isolable MSL Break, PB 12 Fails to Fast Transfer, FW Pump 11 Trip, Turbine | |||
==Title:== | |||
Building Ventilation Trips Si nature Printed Name Date | |||
~- | |||
Developed By Paul Isham 6/2/14 Validated By Pat O'Brien 8/20/14 | |||
.. Leigh Mason 8/20/14 Dave Ballard 8/20/14 Facility Reviewer L;;:C_ | |||
iY Greg Elkins 2/t,)r Page 1 of 23 NRC Scenario 2 March 2015 | |||
Exelon Generation References | |||
: 1. N 1-0P-19, Circulating Water System | |||
: 2. N1-0P-1, NSSS | |||
: 3. N1-SOP-1, Reactor Scram | |||
: 4. N1-SOP-1.1, Emergency Power Reduction | |||
: 5. N1-SOP-25.2, Fuel Failure or High Activity in Reactor Coolant or Off Gas | |||
: 6. N1-SOP-30.2, Loss of PB 12 | |||
: 7. N1-EOP-1, NMP1 EOP Support Procedure | |||
: 8. N1-EOP-2, RPV Control | |||
: 9. N1-EOP-6, Radioactivity Release Control | |||
: 10. N1-EOP-8, RPV Slowdown | |||
: 11. Unit 1 Technical Specifications Page 2 of 23 NRC Scenario 2 March 2015 | |||
Exelon Generation Instructor Information A. Scenario Description Sequence of Events I Expected Crew Response: | |||
The scenario begins at approximately 50-55% power. Containment Spray pump 112 and Reactor Building Exhaust Fan 12 are out of service for maintenance. Circulating Water pump 11 is out of service following maintenance. The crew will start Circulating Water pump 11, then raise Reactor power with recirculation flow. | |||
Then, Recirculation flow unit 11 fails upscale. The crew will respond per the alarm response procedure and the CRS will determine the Tech Spec impact. | |||
Then, an inadvertent EC initiation occurs. The crew will respond to isolate the EC and the CRS will determine the Tech Spec impact. | |||
Next, fuel failure will occur due to the previous transients. The crew will respond per N1-SOP-25.2, Fuel Failure or High Activity in Rx Coolant or Off-Gas. This includes performing an emergency power reduction per N1-SOP-1.1, and eventually scramming the Reactor per N1-SOP-1 (Critical Task). When the Generator trips after the scram, Powerboard 12 will fail to transfer to reserve power. The crew will execute N1-SOP-30.2, Loss of Powerboard 12, to re-energize the powerboard. Feedwater Pump 11 will trip shortly after the reactor scram. | |||
Following the scram, a Main Steam line break will occur. The MSIVs will fail to close both automatically and manually, leading to an un-isolable leak into the Turbine Building. The running Turbine Building ventilation exhaust fan will trip. The crew will start the standby Turbine Building ventilation exhaust fan, however it will trip after a short time delay. This will allow an un-monitored, ground level release from the Turbine Building. The crew will enter N1-EOP-6, Radioactivity Release Control. Field reports will indicate off-site release rates approaching the General Emergency level. The crew will perform an RPV Slowdown per N1-EOP-8 (Critical Task). | |||
: 1. Termination Criteria | |||
: a. RPV water level controlled in assigned band, RPV Slowdown in progress Page 3 of 23 NRC Scenario 2 March 2015 | |||
Exelon Generation@ | |||
: 2. Critical Tasks CT-1, Given fuel failure causing Main Steam Line radiation levels to approach and/or exceed 3.75 times normal full power background, scram the Reactor, in accordance with N1-SOP-25.2. | |||
: 2. Critical Tasks CT-1, Given fuel failure causing Main Steam Line radiation levels to approach and/or exceed 3.75 times normal full power background, scram the Reactor, in accordance with N1-SOP-25.2. | |||
Justification: | Justification: | ||
Safetv Significance: High Main Steam Line radiation levels indicate fuel failure and release of fission products to the Reactor coolant. | Safetv Significance: High Main Steam Line radiation levels indicate fuel failure and release of fission products to the Reactor coolant. A Reactor scram reduces the rate of energy production and thus the heat input, radioactivity release, and flow down the Main Steam Lines. Scramming the Reactor also allows further mitigating actions, such as Reactor isolation and depressurization. | ||
A Reactor scram reduces the rate of energy production and thus the heat input, radioactivity | Cueing: Multiple annunciators and radiation monitors will provide indications of fuel failure. N1-SOP-25. 2 directs scramming the Reactor. | ||
Measurable Performance Indicators: Rotation of the Mode Switch to SHUTDOWN or depressing the manual scram pushbuttons will provide observable actions for the evaluation team. | |||
Performance Feedback: Control rod position and Reactor power indications will provide performance feedback regarding the success of the scram. | |||
Cueing: Multiple annunciators and radiation monitors will provide indications of fuel failure. | CT-2, Given an un-isolable primary system discharging outside of primary and secondary containments and off-site release rate approaching the General Emergency level, perform an RPV Slowdown, in accordance with N1-EOP-6. | ||
N1-SOP-25. | |||
2 directs scramming the Reactor. | |||
Measurable Performance Indicators: | |||
Rotation of the Mode Switch to SHUTDOWN or depressing the manual scram pushbuttons will provide observable actions for the evaluation team. Performance Feedback: | |||
Control rod position and Reactor power indications will provide performance feedback regarding the success of the scram. CT-2, Given an un-isolable primary system discharging outside of primary and secondary containments and off-site release rate approaching the General Emergency level, perform an RPV Slowdown, in accordance with N1-EOP-6. | |||
Justification: | Justification: | ||
Safety Significance: | Safety Significance: An un-isolable primary system discharging outside of Primary and Secondary Containments resulting in off-site release rates approaching the General Emergency limit indicates a significant problem posing a direct and immediate threat to the health and safety of the public. A blowdown minimizes flow through the break, rejects heat to the suppression pool in preference to outside the containment, and places the primary system in the lowest possible energy state. This will lower the release of radioactivity to the environment and lower the dose received by the public. | ||
An un-isolable primary system discharging outside of Primary and Secondary Containments resulting in off-site release rates approaching the General Emergency limit indicates a significant problem posing a direct and immediate threat to the health and safety of the public. A blowdown minimizes flow through the break, rejects heat to the suppression pool in preference to outside the containment, and places the primary system in the lowest possible energy state. This will lower the release of radioactivity to the environment and lower the dose received by the public. Cueing: Multiple annunciators will provide indications of a primary system discharging into the Turbine Building. | Cueing: Multiple annunciators will provide indications of a primary system discharging into the Turbine Building. MSIV valve position indicators will provide indication that the system is un-isolable. Field reports will provide indication that off-site release rate approaches the General Emergency level. N1-EOP-6 provides direction to blowdown the Reactor. | ||
MSIV valve position indicators will provide indication that the system is un-isolable. | Measurable Performance Indicators: The crew will manually initiate Emergency Condensers and open ERVs. | ||
Field reports will provide indication that site release rate approaches the General Emergency level. N1-EOP-6 provides direction to blowdown the Reactor. Measurable Performance Indicators: | Performance Feedback: Emergency Condenser and ERV instrumentation will provide indication that these systems are functioning properly once placed in service. Multiple Reactor pressure indicators and annunciators will provide performance feedback regarding the success of the blowdown. | ||
The crew will manually initiate Emergency Condensers and open ERVs. Performance Feedback: | Page 4 of 23 NRC Scenario 2 March 2015 | ||
Emergency Condenser and ERV instrumentation will provide indication that these systems are functioning properly once placed in service. | |||
Multiple Reactor pressure indicators and annunciators will provide performance feedback regarding the success of the blowdown. | Exelon Generation | ||
Page 4 of 23 NRC Scenario 2 March 2015 Exelon Generation | : 3. Length | ||
: 3. Length a. -60 minutes 4. Mitigation Strategy Code a. RR4, Primary system leak outside of primary and secondary containment, RPV Blowdown required due to General Emergency release rate approached | : a. -60 minutes | ||
: 5. Technical Specifications | : 4. Mitigation Strategy Code | ||
: a. TS 3.6.2.a and g b. TS 3.1.3.b 6. EAL Classification | : a. RR4, Primary system leak outside of primary and secondary containment, RPV Blowdown required due to General Emergency release rate approached | ||
: a. Site Area Emergency EAL RS1 .2 ->1 OOmRem TEDE at site boundary | : 5. Technical Specifications | ||
: 7. Special Orders a. None Page 5 of 23 NRC Scenario 2 March 2015 Exelon Generation | : a. TS 3.6.2.a and g | ||
: 8. Initial Conditions | : b. TS 3.1.3.b | ||
: 1. IC Number a. IC-152 2. Presets I With Triggers | : 6. EAL Classification | ||
: a. Malfunctions | : a. Site Area Emergency EAL RS1 .2 - >1 OOmRem TEDE at site boundary | ||
: 1) CT01 B, CT Pump 112 Trip 2) HV01 B, Reactor Building Exhaust Fan Trip 12 3) E027, PB 12 Auto Transfer Failure 4) NM36A, RECIRC FLOW CONVERTER CHANNEL 11 FAILURE -UPSCALE 5) EC038, EC RETURN VALVE FAILS OPEN(IV 39-06) 6) RX01, FUEL CLADDING | : 7. Special Orders | ||
: a. None Page 5 of 23 NRC Scenario 2 March 2015 | |||
FV=10% 10) M513C, MSIV FAILS OPEN MS01-03(112), | |||
FV=10% b. Remotes 1) E040A, l&C Bus 130 NC Supply Breaker from IC XFMR (PB 13B), Open 2) E0408, l&C Bus 130 NO Supply Breaker from PB 167A, Closed, DT=5sec c. Overrides | Exelon Generation | ||
: 1) 115300154110, POS_11L9/203-01APOSA, FV=on, DT=2:00 2) 115300154111, POS_2 1L9/203-01A POS C, FV=off, DT=2:00 (Turbine Building Ventilation exhaust fan 11 trips) 3) 115310154112, POS_11L9/203-01APOSA, FV=on, DT=1:00 4) 115310154113, POS_2 1L9/203-01A POS C, FV=off, DT=1:00 (Turbine Building Ventilation exhaust fan 12 trips) Page 6 of 23 NRC Scenario 2 | : 8. Initial Conditions | ||
: d. Annunciators | : 1. IC Number | ||
: 1) None e. Event Triggers | : a. IC-152 | ||
: 2. Presets I With Triggers | |||
: 1) RMI for power ascension with recirc flow 2) Markup N1-0P-19 Section E.2.0 up to step E.2.7 3) Markup N1-0P-43B Section F.3.0 to the appropriate steps for 50% power level (up to F.3.25 with steps 3.20 and 3.23 still open) h. Miscellaneous | : a. Malfunctions | ||
: 1) Ensure TB Exhaust Fan 11 is in service 2) Protect the following equipment: | : 1) CT01 B, CT Pump 112 Trip Inserted | ||
EOG 103, PB 103, PB 12, Gire Water pump 12 3) Update Divisional Status Board 4) DW Cooling Fan 11 secured Page 7 of 23 NRC Scenario 2 March 2015 Exelon Generation SHIFT TURNOVER INFORMATION ON COMING SHIFT: | : 2) HV01 B, Reactor Building Exhaust Fan Trip 12 Inserted | ||
: 3) E027, PB 12 Auto Transfer Failure Inserted | |||
* Control Panel Walkdown (all panels) (SRO, ROs) PART II: To be reviewed by the oncoming Operator before assuming the shift. | : 4) NM36A, RECIRC FLOW CONVERTER CHANNEL 11 FAILURE - UPSCALE TRG 1 | ||
: 5) EC038, EC RETURN VALVE FAILS OPEN(IV 39-06) TRG2 | |||
: 6) RX01, FUEL CLADDING FAILURE, FV=34, IV=10, RT=5:00 TRG4 | |||
: 7) M501, Steam Line Break Outside PC Area, FV=12, IV=5, RT=4:00 TRG5 | |||
: 8) FW03A, FEEDWATER PUMP TRIP 11 Inserted | |||
: 9) M513A, MSIV FAILS OPEN MS01-01(111), FV=10% Inserted | |||
: 10) M513C, MSIV FAILS OPEN MS01-03(112), FV=10% Inserted | |||
: b. Remotes | |||
: 1) E040A, l&C Bus 130 NC Supply Breaker from IC XFMR (PB 13B), Open TRG15 | |||
: 2) E0408, l&C Bus 130 NO Supply Breaker from PB 167A, Closed, DT=5sec TRG 15 | |||
: c. Overrides | |||
: 1) 115300154110, POS_11L9/203-01APOSA, FV=on, DT=2:00 TRG5 | |||
: 2) 115300154111, POS_2 1L9/203-01A POS C, FV=off, DT=2:00 TRG5 (Turbine Building Ventilation exhaust fan 11 trips) | |||
: 3) 115310154112, POS_11L9/203-01APOSA, FV=on, DT=1:00 TRG6 | |||
: 4) 115310154113, POS_2 1L9/203-01A POS C, FV=off, DT=1:00 TRG6 (Turbine Building Ventilation exhaust fan 12 trips) | |||
Page 6 of 23 NRC Scenario 2 March 2015 | |||
Exelon Generation@ | |||
: d. Annunciators | |||
: 1) None | |||
: e. Event Triggers Event# ., Sv4tnt ActiOR | |||
. :.',) ,, | |||
f~i comm*nd TRG 6, Initiates Turbine Building exhaust fan 12 is started zdhvtbft(6)==0 Blank TRG 10, Ramps up fuel failure once the stack isolates hzlog002g==1 imf rx01 (0 0) 45 8:00 34 | |||
: f. Equipment Out of Service | |||
: 1) Containment Spray Pump 112 in PTL with yellow tag | |||
: 2) Containment Spray suction isolation valve 112 closed with yellow tag | |||
: 3) Reactor Building Exhaust Fan 12 secured with yellow tag | |||
: 4) Circulating Water Pump 11 secured with no tag | |||
: g. Support Documentation | |||
: 1) RMI for power ascension with recirc flow | |||
: 2) Markup N1-0P-19 Section E.2.0 up to step E.2.7 | |||
: 3) Markup N1-0P-43B Section F.3.0 to the appropriate steps for 50% power level (up to F.3.25 with steps 3.20 and 3.23 still open) | |||
: h. Miscellaneous | |||
: 1) Ensure TB Exhaust Fan 11 is in service | |||
: 2) Protect the following equipment: EOG 103, PB 103, PB 12, Gire Water pump 12 | |||
: 3) Update Divisional Status Board | |||
: 4) DW Cooling Fan 11 secured Page 7 of 23 NRC Scenario 2 March 2015 | |||
Exelon Generation SHIFT TURNOVER INFORMATION ON COMING SHIFT: IN ID DATE: _;T;....;:o'-=d=a'""'"y_ __ | |||
PARTI: To be performed by the oncoming Operator before assuming the shift. | |||
* Control Panel Walkdown (all panels) (SRO, ROs) | |||
PART II: To be reviewed by the oncoming Operator before assuming the shift. | |||
* LCO Status (SRO) | * LCO Status (SRO) | ||
* Shift Turnover Information Sheet Evolutions/General Information/Equipment Status: | * Shift Turnover Information Sheet Evolutions/General Information/Equipment Status: | ||
Line 1,348: | Line 1,907: | ||
* Containment Spray pump 112 is out of service for maintenance (Day 1 of planned 2 day window; 15 day LCO per TS 3.3.7.b). | * Containment Spray pump 112 is out of service for maintenance (Day 1 of planned 2 day window; 15 day LCO per TS 3.3.7.b). | ||
* Reactor Building Exhaust Fan 12 is out of service for maintenance. | * Reactor Building Exhaust Fan 12 is out of service for maintenance. | ||
PART Ill: Remarks/Planned Evolutions: | PART Ill: Remarks/Planned Evolutions: | ||
* Start Circulating Water pump 11 per N1-0P-19 Section E.2.0. The section is complete up to step E.2. 7. In step E.2.11, it is desired to stop both Circulating Water Priming pumps. A Plant Operator is standing by in the screen house. | * Start Circulating Water pump 11 per N1-0P-19 Section E.2.0. The section is complete up to step E.2. 7. In step E.2.11, it is desired to stop both Circulating Water Priming pumps. A Plant Operator is standing by in the screen house. | ||
* Continue Reactor power ascension with Recirculation flow per the provided RMI and N1-0P-43B. | * Continue Reactor power ascension with Recirculation flow per the provided RMI and N1-0P-43B. | ||
N1-0P-43B Section F.3.0 is in progress. | N1-0P-43B Section F.3.0 is in progress. | ||
Page 8 of 23 NRC Scenario 2 March 2015 | Page 8 of 23 NRC Scenario 2 March 2015 | ||
_.,.,, Exelon Generation ATTACHMENT 2: REACTIVITY MANEUVER INSTRUCTION Reactivity Maneuver: | |||
Power Ascension from 55% Step: 1 I INITIAL CONDITIONS/STEP DESCRIPTION I RE presence required in the Control Room? Yes_ No | _.,.,, Exelon Generation ATTACHMENT 2: REACTIVITY MANEUVER INSTRUCTION Reactivity Maneuver: Power Ascension from 55% Step: 1 I INITIAL CONDITIONS/STEP DESCRIPTION | ||
Critical parameters to be monitored DURING Step: Critical parameters not used must be deleted OR marked N/A Critical Parameter Limit Owner Frequency Contingency | ,/ | ||
N/A D. I | I RE presence required in the Control Room? Yes_ No If YES above, RE presence not required for steps_. | ||
I Step Prepared by: Alex Reed I Today Step Reviewed by: Jack Dean I Today RE/STA Date RE/STA/SRO Date Approval to perform Step John Aaron I Today Step Completed by: I Shift Manager Date SRO Date Page 9 of 23 NRC Scenario 2 March 2015 Exelon Generation Shift Turnover Plant Response | Initial conditions to be verified prior to initiation of step: | ||
Parameter Expected Range Actual Parameter Expected Range Actual CTP 1030-1070 MWth Description of Step: | |||
Raise Reactor power to approximately 65% with Recirculation flow per N1-0P-43B. | |||
Critical parameters to be monitored DURING Step: | |||
Critical parameters not used must be deleted OR marked N/A Critical Parameter Limit Owner Frequency Contingency 67.5 Recirc Flow RO Continuous Stop evolution and consult RE. | |||
Mlbm/hr Lower power to less than 1850 MWth with CTP 1850 MWth RO Continuous Recirculation flow. | |||
Rod line 108% RO 15 minutes Stop evolution and consult RE. | |||
RMI evaluated against approved power profile:* N/A D. I IOther Comments: | |||
I Step Prepared by: Alex Reed I Today Step Reviewed by: Jack Dean I Today RE/STA Date RE/STA/SRO Date Approval to perform Step John Aaron I Today Step Completed by: I Shift Manager Date SRO Date Page 9 of 23 NRC Scenario 2 March 2015 | |||
Exelon Generation Shift Turnover z~A6uonsf .. .. Plant Response I* o*pe:*ratC>rActtcms' Take the Simulator out of freeze before the crew enters for the pre-shift walkdown. | |||
* Verify annunciator sound turned on | * Verify annunciator sound turned on | ||
* If recording | * If recording scenario, start the recording device during the pre-shift walkdown Allow no more than 5 minutes to walkdown the Crew panels. | ||
* Walkdown panels | * Walkdown panels | ||
* Conduct shift turnover brief | * Conduct shift turnover brief | ||
* Assume the shift Page 10 of 23 NRC Scenario 2 March 2015 Exelon Generation Event #1: Start Circulating Water Pump 11 | * Assume the shift Page 10 of 23 NRC Scenario 2 March 2015 | ||
Exelon Generation Event #1: Start Circulating Water Pump 11 | |||
* The Plant is operating approximately 55% power | * The Plant is operating approximately 55% power | ||
* The crew will start Gire Water Pump 11 per N1-0P-19 SRO | * The crew will start Gire Water Pump 11 per N1-0P-19 SRO | ||
Line 1,370: | Line 1,939: | ||
* Provides oversight for evolution BOP | * Provides oversight for evolution BOP | ||
* Reviews N1-0P-19 Section E.2.0 Role Play: | * Reviews N1-0P-19 Section E.2.0 Role Play: | ||
* Verifies running CRD Pump flow greater than 60 When requested, report a good start on Circulating GPM Water pump 11. | * Verifies running CRD Pump flow greater than 60 When requested, report a good start on Circulating GPM Water pump 11. | ||
* Starts 74-01, CONDSR CIRCULATING WATER PUMP 11 | * Starts 74-01, CONDSR CIRCULATING WATER PUMP 11 Role Play: | ||
* Closes 74-20, FISH SCREEN DRAIN VALVE 11 | * Closes 74-20, FISH SCREEN DRAIN VALVE 11 When requested, report normal circulating water | ||
* Contacts Operator to confirm normal circulating water pump discharge pressure in Screen House pump discharge pressure in Screen House. | |||
* Verifies the following pumps are stopped per SM direction: | * Verifies the following pumps are stopped per SM direction: | ||
Role Play: | Role Play: | ||
* 75-09, COND. WATER BOX PRIMING If asked as Shift Manager, direct securing both Water PUMP NO. 11 Box Priming pumps. | * 75-09, COND. WATER BOX PRIMING If asked as Shift Manager, direct securing both Water PUMP NO. 11 Box Priming pumps. | ||
* 75-08, COND. WATER BOX PRIMING PUMP NO. 12 ATC | * 75-08, COND. WATER BOX PRIMING PUMP NO. 12 ATC | ||
* Monitors plant parameters Page 11 of 23 NRC Scenario 2 March 2015 Exelon Generation Event #2: Power Ascension With Recirculation Flow | * Monitors plant parameters Page 11 of 23 NRC Scenario 2 March 2015 | ||
Exelon Generation Event #2: Power Ascension With Recirculation Flow | |||
* The crew will raise power with recirc flow per the RMI SRO | * The crew will raise power with recirc flow per the RMI SRO | ||
* Directs power ascension with Recirculation flow in accordance with N1-0P-43B and the Reactivity Maneuver Instruction (RMI) | * Directs power ascension with Recirculation flow in accordance with N1-0P-43B and the Reactivity Maneuver Instruction (RMI) | ||
Line 1,384: | Line 1,955: | ||
* Acknowledges direction from SRO restrictions: | * Acknowledges direction from SRO restrictions: | ||
* Raises Recirculation flow with master | * Raises Recirculation flow with master | ||
* PRIOR to exceeding 65% flow, verify greater than 50% Rod Line OR that RIP region will NOT | * PRIOR to exceeding 65% flow, verify greater Recirculation flow controller than 50% Rod Line OR that RIP region will NOT | ||
* Monitors APRMs be entered. | |||
* Monitors APRMs | |||
* Monitors Recirculation flow | * Monitors Recirculation flow | ||
* Monitors Feedwater flow and RPV water level | * PRIOR to 100% rod line raise recirc flow to | ||
* Observes power-to-flow map restrictions BOP | * Monitors Feedwater flow and RPV water level greater than 59% flow (approximately 40 x 106 | ||
* Monitors individual RRPs for response | * Observes power-to-flow map restrictions lb/hr) to avoid the flow biased control rod block line. | ||
* Individual MIA-Speed Control stations trending uniformly | BOP Note: | ||
* Monitors individual RRPs for response Recommend initiating the next event when Reactor | |||
* Individual MIA-Speed Control stations power is between 55-60% power. trending uniformly | |||
* Individual RRP indications trending normally for speed increase | * Individual RRP indications trending normally for speed increase | ||
* Monitors Feedwater controls for proper response | * Monitors Feedwater controls for proper response | ||
* FWP 13 FCV responding to power change | * FWP 13 FCV responding to power change | ||
* RPV water level remains within program band (65" -83") Page 12 of 23 NRC Scenario 2 March 2015 Exelon Generation Event #3: Recirculation Flow Unit Fails Upscale 'Event .. | * RPV water level remains within program band (65" - 83") | ||
Page 12 of 23 NRC Scenario 2 March 2015 | |||
Exelon Generation Event #3: Recirculation Flow Unit Fails Upscale | |||
'Event .. | |||
* Recirc flow unit 11 fails upscale . | * Recirc flow unit 11 fails upscale . | ||
Crew responds per ARP F2-2 no manipulations made. | |||
CRS makes Tech Spec determination. | |||
When directed by lead examiner, insert CREW malfunction: | When directed by lead examiner, insert CREW malfunction: | ||
* Recognize/report Recirculation flow unit 11 failed upscale NM36A, RECIRC FLOW CONVERTER CHANNEL 11 FAILURE-UPSCALE TRG 1 Comparator trip occurs resulting in a Rod Block. The "FLOW COMPARATOR" lamps on the Rod Block Display (PANEL E) will light. The upscale light on Flow Converter 11 (G Panel) will light Expected Annunciators: | * Recognize/report Recirculation flow unit 11 failed upscale NM36A, RECIRC FLOW CONVERTER CHANNEL 11 FAILURE- UPSCALE TRG 1 Comparator trip occurs resulting in a Rod Block. | ||
The "FLOW COMPARATOR" lamps on the Rod Block Display (PANEL E) will light. | |||
The upscale light on Flow Converter 11 (G Panel) will light Expected Annunciators: | |||
F2-2-6, APRM FLOW UNIT 11 F3-2-1, APRM FLOW UNIT 12 F3-4-4, ROD BLOCK SRO | F2-2-6, APRM FLOW UNIT 11 F3-2-1, APRM FLOW UNIT 12 F3-4-4, ROD BLOCK SRO | ||
* Acknowledges reports from crew | * Acknowledges reports from crew | ||
Line 1,408: | Line 1,986: | ||
* Determines a half scram must be placed on RPS channel 11 within 1 hour | * Determines a half scram must be placed on RPS channel 11 within 1 hour | ||
* Contacts l&C Department for troubleshooting ATC | * Contacts l&C Department for troubleshooting ATC | ||
* Verifies proper power to flow ratio on Power Flow Map on E Panel Page 13 of 23 NRC Scenario 2 March 2015 Exelon Generation Event 3 continued BOP | * Verifies proper power to flow ratio on Power Flow Map on E Panel Page 13 of 23 NRC Scenario 2 March 2015 | ||
~* Exelon Generation Event 3 continued BOP | |||
* Executes ARP F2-2-6 | * Executes ARP F2-2-6 | ||
* Confirms alarm by observing the following: | * Confirms alarm by observing the following: | ||
o Computer Printout o APRM Flow Comparator on G Panel o LPRM/APRM Trip Auxiliary Panels on G Panel o Rod Block Monitor on E Panel Page 14 of 23 NRC Scenario 2 March 2015 Exelon Generation Event #4: Inadvertent Initiation of Emergency Condenser 12 | o Computer Printout o APRM Flow Comparator on G Panel o LPRM/APRM Trip Auxiliary Panels on G Panel o Rod Block Monitor on E Panel Page 14 of 23 NRC Scenario 2 March 2015 | ||
Exelon Generation Event #4: Inadvertent Initiation of Emergency Condenser 12 | |||
* Emergency Condenser 12 goes into service inadvertently | * Emergency Condenser 12 goes into service inadvertently | ||
* The crew will isolate the EC per the ARPs | * The crew will isolate the EC per the ARPs | ||
* CRS makes Tech Spec determination. | * CRS makes Tech Spec determination. | ||
When directed by lead examiner, insert CREW malfunction: | When directed by lead examiner, insert CREW malfunction: | ||
* Recognize/report Emergency Condenser 12 EC03B, EC RETURN VALVE FAILS OPEN (IV 39-initiation | * Recognize/report Emergency Condenser 12 EC03B, EC RETURN VALVE FAILS OPEN (IV 39- initiation | ||
: 06) | : 06) | ||
* Recognize/report Reactor power and water level TRG2 rising EC 12 Condensate Return Valve (39-06) opens | * Recognize/report Reactor power and water level TRG2 rising EC 12 Condensate Return Valve (39-06) opens | ||
* Recognize/report no valid Emergency Condenser Reactor power rises initiation signal Reactor water level initially rises Expected Annunciators: | * Recognize/report no valid Emergency Condenser Reactor power rises initiation signal Reactor water level initially rises Expected Annunciators: | ||
K1-1-5, EMER COND CONDEN RET /SOL VALVE 12 OPEN SRO | K1-1-5, EMER COND CONDEN RET /SOL VALVE 12 OPEN SRO Role Play: | ||
* Acknowledges reports from crew | * Acknowledges reports from crew If dispatched to investigate 39-06, wait 2 minutes and | ||
* Directs response with ARP K1-1-5 then report that there is a significant air leak on the | * Directs response with ARP K1-1-5 then report that there is a significant air leak on the | ||
* Directs securing Emergency Condenser 12 air supply line to 39-06. | * Directs securing Emergency Condenser 12 air supply line to 39-06. | ||
* Declares Emergency Condenser 12 inoperable but available | * Declares Emergency Condenser 12 inoperable but available | ||
* Enters a 7 day LCO per Tech Spec 3.1.3.b | * Enters a 7 day LCO per Tech Spec 3.1.3.b | ||
* May direct entry into N1-SOP-1.5, Unplanned Reactor Power Change Note: BOP The next event should NOT be inserted until Reactor | * May direct entry into N1-SOP-1.5, Unplanned Reactor Power Change Note: BOP The next event should NOT be inserted until Reactor water level has stabilized from this event. | ||
* Executes ARP K1-1-5 | * Executes ARP K1-1-5 | ||
* Closes: 0 39-08R EC STM ISOLATION VALVE 122, and/or 0 39-10R EC STM ISOLATION VALVE 121 Page 15 of 23 NRC Scenario 2 March 2015 Exelon Generation Events #5 and #6: Fuel Failure, PB 12 Fails to Fast Transfer. | * Closes: | ||
0 39-08R EC STM ISOLATION VALVE 122, and/or 0 39-10R EC STM ISOLATION VALVE 121 Page 15 of 23 NRC Scenario 2 March 2015 | |||
Exelon Generation Events #5 and #6: Fuel Failure, PB 12 Fails to Fast Transfer. | |||
* A fuel failure occurs due to the power ascension earlier. | * A fuel failure occurs due to the power ascension earlier. | ||
* The crew will manually scram the reactor. | * The crew will manually scram the reactor. | ||
* PB 12 will not fast transfer but will be available | * PB 12 will not fast transfer but will be available | ||
* FWP 11 will trip | * FWP 11 will trip When directed by the lead examiner, insert CREW malfunction: | ||
RX01, FUEL CLADDING | * Acknowledges/reports annunciator H1-1-7, OFF RX01, FUEL CLADDING FAILURE, FV=34, IV=10, GAS HIGH RADIATION RT=S:OO | ||
* Recognizes rising offgas and main steam line TRG4 radiation levels Rising off-gas radiation levels Rising main steam line radiation levels | |||
* | * Diagnoses fuel failure Expected Annunciators: | ||
H1-1-7, OFF GAS HIGH RADIATION | H1-1-7, OFF GAS HIGH RADIATION H1-2-7, OFF GAS RAD MON 11-12 FILTER IJ.P SAMPLE FLOW H1-3-7, MAIN CNDSR OG TIMER STARTED /SOL TD 15 M H1-4-8, AREA RADIATION MONITORS F1-2-7, MAIN STEAM RAD MONITOR CH 11 HI/LO (later) | ||
F4-2-2, MAIN STEAM RAD MONITOR CH 12 HI/LO (later) | |||
Verify the following malfunctions are preset: | |||
This makes a reasonable range of 1500-1875 mR/hr for the 3. 75 times NFPB benchmark. | ED27, PB 12 Auto Transfer Failure FW03A, FEEDWATER PUMP TRIP 11 Powerboard 12 voltage drops to zero after Generator trip Feedwater pump 11 starts and then immediately trips Page 16 of 23 NRC Scenario 2 March 2015 | ||
The crew may establish a lower threshold for executing the scram and vessel isolation. | |||
Alternately, if the crew scrams and closes MSIVs early, 3.75 times NFPB may not be reached. | Exelon Generation Note: SRO Normal Full Power Background (NFPB) Main Steam | ||
* Acknowledges reports Line (MSL) radiation levels are approximately 410 mR/hr at this power level. Any value between 400- | |||
* Directs entry into N 1-SOP-25.2, Fuel Failure/High 500 mR/hr is reasonable. This makes a reasonable Activity range of 1500-1875 mR/hr for the 3. 75 times NFPB | |||
* May direct emergency power reduction per N1-benchmark. The crew may establish a lower threshold for executing the scram and vessel SOP-1.1 as necessary to control radiation levels isolation. Alternately, if the crew scrams and closes | |||
* Provides oversight for reactivity manipulation MSIVs early, 3.75 times NFPB may not be reached. | |||
* Directs Reactor scram CT-1 | * Directs Reactor scram CT-1 | ||
* Acknowledges scram report | * Acknowledges scram report | ||
* Enters N1-EOP-2, RPV Control, on low Reactor water level | * Enters N1-EOP-2, RPV Control, on low Reactor water level | ||
* Answers "Are all control rods inserted to at least position 04?" Yes | * Answers "Are all control rods inserted to at least Note: | ||
position 04?" Yes High pressure Feedwater will be unavailable until Powerboard 12 is re-energized. | |||
* Directs entry into N1-SOP-1, Reactor Scram | * Directs entry into N1-SOP-1, Reactor Scram | ||
* Directs Reactor water level control 53-95" using Feedwater/Condensate and CRD | * Directs Reactor water level control 53-95" using Feedwater/Condensate and CRD Note: | ||
* Directs Reactor pressure control 800-1000 psig on Turbine Bypass Valves or Emergency Condenser 11 | Emergency Condenser 12 is inoperable from a | ||
* Directs Reactor pressure control 800-1000 psig previous event, however, it is still available for on Turbine Bypass Valves or Emergency pressure control if the crew opts to use it. Condenser 11 | |||
* May direct MSIVs closed | * May direct MSIVs closed | ||
* Directs manual vessel isolation and entry into N 1-SOP-40.2 if Main Steam Line radiation levels reach 3.75 x Normal Full Power Background (NFPB) | * Directs manual vessel isolation and entry into N 1-SOP-40.2 if Main Steam Line radiation levels reach 3.75 x Normal Full Power Background (NFPB) | ||
* Enters N 1-EOP-5, Secondary Containment | * Enters N 1-EOP-5, Secondary Containment Note: Control, on high area radiation levels Recommend initiating the next event once the crew | ||
: Control, on high area radiation levels | * Acknowledges failure of Powerboard 12 to has stabilized the plant post-scram and PB 12 is re- transfer to reserve power energized. | ||
* Acknowledges failure of Powerboard 12 to transfer to reserve power | * Directs entry into N1-SOP-30.2, Loss of Powerboard 12 Page 17 of 23 NRC Scenario 2 March 2015 | ||
* Directs entry into N1-SOP-30.2, Loss of Powerboard 12 Page 17 of 23 NRC Scenario 2 March 2015 Exelon Generation Events 5 & 6 continued ATC | |||
Exelon Generation Events 5 & 6 continued ATC Note: All CRAM rods are already inserted and E | |||
* If directed, performs emergency power reduction Console indication of recirc flow is lost due to earlier per N1-SOP-1.1 malfunctions, thus limiting the ability of N 1-SOP-1.1. | |||
* Places Mode Switch in Shutdown CT-1 | * Places Mode Switch in Shutdown CT-1 | ||
* Performs scram verification actions of N 1-SOP-1, Reactor Scram: | * Performs scram verification actions of N 1-SOP-1, Reactor Scram: | ||
* Confirms all rods inserted | * Confirms all rods inserted | ||
* Observes Reactor power lowering | * Observes Reactor power lowering | ||
* Places | * Places IRMs on range 9 | ||
* Inserts IRM and SRM detectors | * Inserts IRM and SRM detectors | ||
* Down-ranges IRMs as necessary | * Down-ranges IRMs as necessary | ||
* Controls Reactor pressure as directed | * Controls Reactor pressure as directed | ||
* May perform a manual vessel isolation by placing both Vessel Isolation Ch 11 and Ch 12 Control Switches on the E Panel to ISOLATION, if necessary Role Play: When dispatched as Chemistry to take BOP samples, acknowledge request. | * May perform a manual vessel isolation by placing both Vessel Isolation Ch 11 and Ch 12 Control Switches on the E Panel to ISOLATION, if necessary Role Play: When dispatched as Chemistry to take BOP samples, acknowledge request. | ||
* Executes N1-SOP-25.2 | * Executes N1-SOP-25.2 | ||
* Notifies Chemistry to sample offgas and reactor Role Play: When directed to close Turbine Building coolant for gross activity Roof Vents, Sidewall Vents and Roll Doors, wait 2 | * Notifies Chemistry to sample offgas and reactor Role Play: When directed to close Turbine Building coolant for gross activity Roof Vents, Sidewall Vents and Roll Doors, wait 2 minutes then report the Turbine Building Roof Vents, | ||
* Directs operator to close Turbine Building Roof | * Directs operator to close Turbine Building Roof Sidewall Vents and Roll Doors are CLOSED. Also Vents, Sidewall Vents and Roll Doors report that RP is with you, and they have detected | ||
* Monitors ARMs and rad monitors to determine higher than normal rad levels near the offgas piping. plant radiation levels | * Monitors ARMs and rad monitors to determine higher than normal rad levels near the offgas piping. plant radiation levels | ||
* Notifies CRS/Crew of rising Main Steam Line Note: Normal Full Power Background (NFPB) Main Radiation Monitor levels Steam Line (MSL) radiation levels are approximately | * Notifies CRS/Crew of rising Main Steam Line Note: Normal Full Power Background (NFPB) Main Radiation Monitor levels Steam Line (MSL) radiation levels are approximately | ||
* Notifies CRS if MSL Rad Monitors 410 mR/hr at this power level. Any value between | * Notifies CRS if MSL Rad Monitors 410 mR/hr at this power level. Any value between 400-500 mR/hr is reasonable. This makes a approach/exceed 3.75 X Normal Full Power reasonable range of 1500-1875 mR/hr for the 3. 75 Background (NFPB) times NFPB benchmark. | ||
This makes a reasonable range of 1500-1875 mR/hr for the 3. 75 Background (NFPB) times NFPB benchmark. | Page 18 of 23 NRC Scenario 2 March 2015 | ||
Page 18 of 23 NRC Scenario 2 March 2015 Exelon Generation Event 5 & 6 continued BOP continued | |||
Exelon Generation Event 5 & 6 continued BOP continued | |||
* Performs Reactor water level control actions of N1-SOP-1: | * Performs Reactor water level control actions of N1-SOP-1: | ||
* Attempts to restore RPV water level to 53-95" by controlling injection and rejecting through Note: RWCU, as necessary High pressure Feedwater will be unavailable until | * Attempts to restore RPV water level to 53-95" by controlling injection and rejecting through Note: RWCU, as necessary High pressure Feedwater will be unavailable until | ||
* Determines both electric Feedwater pumps Powerboard 12 is re-energized. | * Determines both electric Feedwater pumps Powerboard 12 is re-energized. | ||
NOT running | NOT running | ||
Line 1,494: | Line 2,080: | ||
* IAC 11 running | * IAC 11 running | ||
* RBCLC system running Note: | * RBCLC system running Note: | ||
* Re-energizes Powerboard 12: At the examiner's discretion, move on to next event | * Re-energizes Powerboard 12: | ||
* Answers "Are A5-4-1, A5-4-2, A5-1-8, OR when PB 12 has been re-energized. | At the examiner's discretion, move on to next event | ||
A5-2-8 in alarm?" No | * Answers "Are A5-4-1, A5-4-2, A5-1-8, OR when PB 12 has been re-energized. A5-2-8 in alarm?" No | ||
* Obtains SRO permission to re-energize Powerboard 12 | * Obtains SRO permission to re-energize Powerboard 12 | ||
* Verifies open Breaker | * Verifies open Breaker R122 | ||
* Inserts Sync. Key into R123 AND rotates clockwise to ON | * Inserts Sync. Key into R123 AND rotates clockwise to ON | ||
* Closes Breaker | * Closes Breaker R123 | ||
* Rotates Sync. Key counterclockwise to OFF AND removes | * Rotates Sync. Key counterclockwise to OFF AND removes | ||
* Closes Breakers R124 and R121 Page 19 of 23 NRC Scenario 2 March 2015 | * Closes Breakers R124 and R121 Page 19 of 23 NRC Scenario 2 March 2015 | ||
/118111r' Exelon Generation Events #7, #8, and #9: Main Steam Line Break in Turbine Building, MSIVs Fail to Close, Turbine Building Ventilation Exhaust Fan Trips | |||
/118111r' Exelon Generation Events #7, #8, and #9: Main Steam Line Break in Turbine Building, MSIVs Fail to Close, Turbine Building Ventilation Exhaust Fan Trips | |||
* Fuel failure is complicated by a MSL break in the TB | * Fuel failure is complicated by a MSL break in the TB | ||
* Two MSIVs fail to isolate | * Two MSIVs fail to isolate | ||
* Lose TB Exhaust ventilation leading to unmonitored ground level release, When directed by the lead examiner, insert malfunctions: | * Lose TB Exhaust ventilation leading to unmonitored ground level release, When directed by the lead examiner, insert CREW malfunctions: | ||
M501, Steam Line Break Outside PC Area, FV=12, IV=5, RT=4:00 Main Steam tunnel temperatures rise Turbine Building radiation levels rise Expected Annunciators>> | * Acknowledges/reports annunciators H1-1-7, OFF M501, Steam Line Break Outside PC Area, FV=12, GAS HIGH RADIATION IV=5, RT=4:00 | ||
F1-2-2, RPS CH 11 MAIN STM LINE BREAK | * Diagnoses Main Steam Line break TRG5 Main Steam tunnel temperatures rise Turbine Building radiation levels rise Expected Annunciators>> | ||
F1-2-2, RPS CH 11 MAIN STM LINE BREAK F2-3-2, MAIN STM LINE BREAK AREA TEMP HIGH F4-2-7, RPS CH 12 MAIN STM LINE BREAK H1-4-8, AREA RADIATION MONITORS The following overrides also insert on TRG 5: | |||
115300154110, P05_11L9/203-01A P05 A, FV=on, OT=2:00 115300154111, P05_21L9/203-01A P05 C, FV=off, OT=2:00 Turbine Building exhaust fan 11 trips on a time delay Page 20 of 23 NRC Scenario 2 March 2015 | |||
_.., Exelon Generation Events 7, 8, & 9 continued Verify the following overrides are automatically inserted when Turbine Building exhaust fan 12 is started: | _.., Exelon Generation Events 7, 8, & 9 continued Verify the following overrides are automatically inserted when Turbine Building exhaust fan 12 is started: | ||
115310154112, POS_11L9/203-01A POSA, OT=30, FV=on, OT=1 :00 115310154113, POS_2 1L9/203-01A POS C, OT=30, FV=off, OT=1 :00 Turbine Building exhaust fan 12 trips Verify the following malfunctions are preset: | TRG6 115310154112, POS_11L9/203-01A POSA, OT=30, FV=on, OT=1 :00 115310154113, POS_2 1L9/203-01A POS C, OT=30, FV=off, OT=1 :00 Turbine Building exhaust fan 12 trips Verify the following malfunctions are preset: | ||
FV=10% MS13C, MSIV FAILS OPEN MS01-03(112), | MS13A, MSIV FAILS OPEN MS01-01(111), FV=10% | ||
FV=10% Two MS/Vs fail mid-position on closure Page 21 of 23 NRC Scenario 2 March 2015 Exelon Generation Events 7, 8, & 9 continued Role Plays: When the crew has determined both Turbine Building exhaust fans are inoperable, or when requested as RP/Chemistry to assess dose, wait 2 minutes then report as Off-Site Dose Assessment Manager that dose at the site boundary is 50 mr/hr TEDE and rising. Three minutes later, report that dose at the site boundary is 500 mrem TEDE and rising. Evaluator Cue: After the report is made to the crew that dose at the site boundary exceeds | MS13C, MSIV FAILS OPEN MS01-03(112), FV=10% | ||
Two MS/Vs fail mid-position on closure Page 21 of 23 NRC Scenario 2 March 2015 | |||
Exelon Generation Events 7, 8, & 9 continued SRO | |||
* Acknowledges reports Role Plays: | |||
When the crew has determined both Turbine Building | |||
* Directs MSIVs closed exhaust fans are inoperable, or when requested as | |||
* Directs Turbine Building evacuation RP/Chemistry to assess dose, wait 2 minutes then | |||
* Acknowledges failure of two MSIVs to close report as Off-Site Dose Assessment Manager that dose at the site boundary is 50 mr/hr TEDE and | |||
* May direct cooldown using Turbine Bypass rising. Valves or Emergency Condensers <100°F/hr | |||
* Acknowledges trip of Turbine Building exhaust Three minutes later, report that dose at the site boundary is 500 mrem TEDE and rising. fan 11 | |||
* Directs start of Turbine Building exhaust fan 12 Evaluator Cue: After the report is made to the crew | |||
* Enters N 1-EOP-6 due to off-site release rate above Alert level | * Acknowledges trip of Turbine Building exhaust that dose at the site boundary exceeds 1OOmrem TEDE, inform the CRS that the Shift Manager is fan 12 declaring a Site Area Emergency per EAL RS1 .2 due | ||
* May direct rapid depressurization with Emergency Condenser 11 >100°F/hr | * Dispatches personnel to monitor on-site/off-site to offsite release rate. | ||
* Determines off-site release rate is approaching the General Emergency level | radiation levels Three minutes after previous field report, report that | ||
* Enters N1-EOP-8, RPV Blowdown | * Acknowledges off-site release rate reports dose at the site boundary is 800 mrem TEDE and | ||
* Enters N 1-EOP-6 due to off-site release rate rising. | |||
above Alert level | |||
* May direct rapid depressurization with Three minutes later, report that dose at the site Emergency Condenser 11 >100°F/hr boundary is 950 mrem TEDE and rising. | |||
* Determines off-site release rate is approaching the General Emergency level Three minutes later, report that dose at the site | |||
* Enters N1-EOP-8, RPV Blowdown boundary is 1100 mrem TEDE and rising. | |||
* Directs initiation of EC 11 | * Directs initiation of EC 11 | ||
* Directs open 4 ERVs If asked for an update between reports, give an CT-2 extrapolated value for dose at the site boundary. | * Directs open 4 ERVs If asked for an update between reports, give an CT-2 extrapolated value for dose at the site boundary. | ||
If dispatched into the plant for any other task, wait 2 minutes and then report that there is excessive steam in the Turbine Building and you have backed out. Page 22 of 23 NRC Scenario 2 March 2015 Exelon Generation | If dispatched into the plant for any other task, wait 2 minutes and then report that there is excessive steam in the Turbine Building and you have backed out. | ||
Page 22 of 23 NRC Scenario 2 March 2015 | |||
Exelon Generation ATC/BOP | |||
* Reports failure of MSIVs to automatically close on high steam tunnel temperature | * Reports failure of MSIVs to automatically close on high steam tunnel temperature | ||
* Attempts to manually close MSIVs | * Attempts to manually close MSIVs | ||
* Reports failure of two MSIVs to close | * Reports failure of two MSIVs to close | ||
* Makes Turbine Building evacuation announcement | * Makes Turbine Building evacuation announcement | ||
* May open Turbine Bypass Valves or initiate Emergency Condenser 11 to cooldown | * May open Turbine Bypass Valves or initiate Emergency Condenser 11 to cooldown <100°F/hr | ||
<100°F/hr | |||
* Reports trip of Turbine Building exhaust fan 11 | * Reports trip of Turbine Building exhaust fan 11 | ||
* Starts Turbine Building exhaust fan 12 | * Starts Turbine Building exhaust fan 12 | ||
Line 1,544: | Line 2,139: | ||
* Dispatches personnel to monitor on-site/off-site radiation levels | * Dispatches personnel to monitor on-site/off-site radiation levels | ||
* Acknowledges/reports off-site release rate reports | * Acknowledges/reports off-site release rate reports | ||
* May perform rapid depressurization with Emergency Condenser 11 > 100°F /hr | * May perform rapid depressurization with Emergency Condenser 11 > 100°F/hr | ||
* Initiates EC 11 | * Initiates EC 11 | ||
* Open 4 ERVs | * Open 4 ERVs CT-2 | ||
* Controls Reactor water level 53-95" using Condensate/Feedwater and CRD | * Controls Reactor water level 53-95" using Condensate/Feedwater and CRD | ||
* RPV water level controlled in assigned band | * RPV water level controlled in assigned band | ||
* RPV Slowdown in progress Page 23 of 23 March 2015 Exelon Generation Copy of __ Training Id: NRC 2015 Scenario 3 Revision: | * RPV Slowdown in progress Page 23 of 23 NRC Scenario 2 March 2015 | ||
0.1 Condensate Pump S/D, Sequence | |||
Exelon Generation Copy of __ | |||
: 1. N1-0P-5, Control Rod Drive System 2. N1-0P-15A, Condensate System 3. N 1-0P-48, Motor Generator Sets 4. N1-SOP-11.1, RBCLC Failure 5. N 1-SOP-1, Reactor Scram 6. N1-SOP-16.1, FeedwaterSystem Failures | Training Id: NRC 2015 Scenario 3 Revision: 0.1 Condensate Pump S/D, Sequence Exchange, MSL Rad Monitor Failure, RBCLC TCV Failure, RPS MG Set Trip, Instrument Air Leak, | ||
: 7. N1-SOP-20.1, Instrument Air Failure 8. N1-EOP-2, RPV Control 9. N1-EOP-3, Failure to Scram 10. N1-EOP-1, NMP1 EOP Support Procedure | |||
: 11. Unit 1 Technical Specifications Page 2 of 28 NRC Scenario 3 March 2015 Exelon Generation Instructor Information A. Scenario Description Sequence of Events I Expected Crew Response: | ==Title:== | ||
The crew assumes the shift at approximately 85% power. Containment Spray pump 112 and Reactor Building Exhaust Fan 12 are out of service for maintenance. | ATWS, Feedwater IVs Stick Signature I Printed Name Developed By ~aullsham 6/2/14 Validated By Pat O'Brien 8/20/14 Leigh Mason 8/20/14 Dave Ballard 8/20/14 Facility Reviewer Greg Elkins z/11/1r Page 1 of 28 NRC Scenario 3 March 2015 | ||
The crew is directed to remove Condensate Pump 11 from service immediately for maintenance due to a motor oil leak. After the pump has been removed from service, the crew will conduct a rod pattern exchange. | |||
During the rod pattern exchange, a Main Steam Line Rad monitor will fail inoperable. | Exelon Generation References | ||
The SRO will address Tech Specs. Next, the Reactor Building Closed Loop Cooling (RBCLC) Temperature Controller will fail such that RBCLC temperatures rise. This failure will require placing the RBCLC controller in manual and restoring the effected equipment to normal temperatures. | : 1. N1-0P-5, Control Rod Drive System | ||
: 2. N1-0P-15A, Condensate System | |||
: 3. N 1-0P-48, Motor Generator Sets | |||
: 4. N1-SOP-11.1, RBCLC Failure | |||
: 5. N 1-SOP-1, Reactor Scram | |||
: 6. N1-SOP-16.1, FeedwaterSystem Failures | |||
: 7. N1-SOP-20.1, Instrument Air Failure | |||
: 8. N1-EOP-2, RPV Control | |||
: 9. N1-EOP-3, Failure to Scram | |||
: 10. N1-EOP-1, NMP1 EOP Support Procedure | |||
: 11. Unit 1 Technical Specifications Page 2 of 28 NRC Scenario 3 March 2015 | |||
Exelon Generation Instructor Information A. Scenario Description Sequence of Events I Expected Crew Response: | |||
The crew assumes the shift at approximately 85% power. Containment Spray pump 112 and Reactor Building Exhaust Fan 12 are out of service for maintenance. The crew is directed to remove Condensate Pump 11 from service immediately for maintenance due to a motor oil leak. | |||
After the pump has been removed from service, the crew will conduct a rod pattern exchange. During the rod pattern exchange, a Main Steam Line Rad monitor will fail inoperable. The SRO will address Tech Specs. | |||
Next, the Reactor Building Closed Loop Cooling (RBCLC) Temperature Controller will fail such that RBCLC temperatures rise. This failure will require placing the RBCLC controller in manual and restoring the effected equipment to normal temperatures. | |||
Then, RPS MG set 141 will trip. The crew will enter SOP-16.1 due to the resulting partial loss of Feedwater heating. | Then, RPS MG set 141 will trip. The crew will enter SOP-16.1 due to the resulting partial loss of Feedwater heating. | ||
The crew must recover the RPS trip bus by shifting to its alternate supply. Next, an Instrument Air leak will occur in the piping to the CRD system. The crew will insert a manual Reactor scram as CRD air pressure lowers below 60 psig (Critical Task). When the scram occurs the control rods will not fully insert. The crew must terminate and prevent injection (Critical Task). When the operator attempts to close Feedwater Isolation Valves 11 and 12, the valves will fail to isolate Feedwater flow. The crew must diagnose the failure and place the Feedwater pumps in Pull-To-Lock to terminate feeding the RPV. The crew will lower Reactor power by inserting control rods per EOP-3.1 and/or using Liquid Poison (Critical Task). | The crew must recover the RPS trip bus by shifting to its alternate supply. Next, an Instrument Air leak will occur in the piping to the CRD system. The crew will insert a manual Reactor scram as CRD air pressure lowers below 60 psig (Critical Task). | ||
: 1. Termination Criteria | When the scram occurs the control rods will not fully insert. The crew must terminate and prevent injection (Critical Task). When the operator attempts to close Feedwater Isolation Valves 11 and 12, the valves will fail to isolate Feedwater flow. The crew must diagnose the failure and place the Feedwater pumps in Pull-To-Lock to terminate feeding the RPV. The crew will lower Reactor power by inserting control rods per EOP-3.1 and/or using Liquid Poison (Critical Task). | ||
: a. RPV water level controlled in assigned band, Reactor power < 6%, Control rod insertion in progress or complete Page 3 of 28 NRC Scenario 3 March 2015 Exelon Generation | : 1. Termination Criteria | ||
: 2. Critical Tasks CT-1, Given lowering CRD system air pressure, the crew will insert a manual reactor scram before control rods begin drifting, in accordance with N1-ARP-F3 and/or N1-SOP-20.1. | : a. RPV water level controlled in assigned band, Reactor power < 6%, Control rod insertion in progress or complete Page 3 of 28 NRC Scenario 3 March 2015 | ||
Exelon Generation | |||
: 2. Critical Tasks CT-1, Given lowering CRD system air pressure, the crew will insert a manual reactor scram before control rods begin drifting, in accordance with N1-ARP-F3 and/or N1-SOP-20.1. | |||
Justification: | |||
Safety Significance: Lowering CRD system air pressure can result in various rods drifting to unpredictable locations in the core. This can lead to an unanalyzed rod pattern and localized power peaking resulting in fuel damage. | |||
Cueing: Annunciators on L 1 and F3 will provide indication for lowering plant air pressures. Procedures direct inserting a manual reactor scram for lowering CRD system air pressure. | |||
Measurable Performance Indicators: Inserting a manual reactor scram will provide observable actions for the evaluation team Performance Feedback: Control rod position and Reactor power will provide performance feedback regarding success of crew actions to insert control rods. | |||
Page 4 of 28 NRC Scenario 3 March 2015 | |||
Exelon Generation CT-2, Given a failure of the reactor to scram with power above 6% and RPV water level above -41 inches, the crew will terminate and prevent all injection except boron and CRD, in accordance with N1-EOP-3. | |||
Justification: | Justification: | ||
Safety Significance: | Safety Significance: High Reactor power after a scram represents a challenge to nuclear fuel and to plant heat sinks. In the event of a loss of the normal heat sink, this may result in adding heat to the Torus and challenging the Primary Containment. Lowering Reactor power reduces these challenges. | ||
Cueing: Control rod position and Reactor power indications will indicate a failure to scram with Reactor power above 6%. | |||
N1-EOP-3 provides direction to trip Recirculation pumps and terminate and prevent injection based on Reactor power. | |||
Measurable Performance Indicators: Manipulation of Recirculation pump control switches, Feedwater system components, and Core Spray jumpers will provide observable actions for the evaluation team. | |||
Performance Feedback: Lowering Recirculation flow, Feedwater flow, Reactor water level, and Reactor power will provide performance feedback regarding the success of crew actions. | |||
High Reactor power after a scram represents a challenge to nuclear fuel and to plant heat sinks. In the event of a loss of the normal heat sink, this may result in adding heat to the Torus and challenging the Primary Containment. | |||
Lowering Reactor power reduces these challenges. | |||
Cueing: Control rod position and Reactor power indications will indicate a failure to scram with Reactor power above 6%. N1-EOP-3 provides direction to trip Recirculation pumps and terminate and prevent injection based on Reactor power. Measurable Performance Indicators: | |||
Manipulation of Recirculation pump control switches, Feedwater system components, and Core Spray jumpers will provide observable actions for the evaluation team. Performance Feedback: | |||
Lowering Recirculation flow, Feedwater flow, Reactor water level, and Reactor power will provide performance feedback regarding the success of crew actions. | |||
CT-3, Given a failure of the reactor to scram with power above 6%, the crew will lower reactor power by inserting control rods or injecting boron, in accordance with N1-EOP-3. | CT-3, Given a failure of the reactor to scram with power above 6%, the crew will lower reactor power by inserting control rods or injecting boron, in accordance with N1-EOP-3. | ||
Justification: | Justification: | ||
Safety Significance: | Safety Significance: Inserting control rods lowers Reactor power, which reduces challenges to the plant during a failure to scram. Additionally, inserting control rods ultimately provides a long-term, stable core shutdown. Boron injection will lower power, however, alone mav not provide a stable shutdown condition. | ||
Inserting control rods lowers Reactor power, which reduces challenges to the plant during a failure to scram. Additionally, inserting control rods ultimately provides a long-term, stable core shutdown. | Cueing: Control rod position and Reactor power indications will indicate a failure to scram. N1-EOP-3 provides direction to insert control rods. | ||
Boron injection will lower power, however, alone mav not provide a stable shutdown condition. | Measurable Performance Indicators: Manipulation of RPS, CRD, and RMCS controls will provide observable actions for the evaluation team. | ||
Cueing: Control rod position and Reactor power indications will indicate a failure to scram. N1-EOP-3 provides direction to insert control rods. Measurable Performance Indicators: | Performance Feedback: Control rod position and Reactor power will provide performance feedback regarding success of crew actions to lower power by inserting control rods or injecting Boron. | ||
Manipulation of RPS, CRD, and RMCS controls will provide observable actions for the evaluation team. Performance Feedback: | Page 5 of 28 NRC Scenario 3 March 2015 | ||
Control rod position and Reactor power will provide performance feedback regarding success of crew actions to lower power by inserting control rods or injecting Boron. Page 5 of 28 NRC Scenario 3 March 2015 Exelon Generation | |||
: 3. Length a. -60 minutes 4. Mitigation Strategy Code a. AT1, | Exelon Generation | ||
: 5. Technical Specifications | : 3. Length | ||
: a. TS 3.1.8 (b), TS 3.6.2 (h) 6. EAL Classification | : a. -60 minutes | ||
: a. Site Area Emergency per EAL SS3.1 -An automatic Scram failed to shut down the reactor as indicated by reactor power >6% AND Manual actions taken at the reactor control console failed to shut down the reactor as indicated by reactor power >6% 7. Special Orders a. None Page 6 of 28 NRC Scenario 3 March 2015 Exelon Generation B. Initial Conditions | : 4. Mitigation Strategy Code | ||
: 1. IC Number a. IC-153 2. Presets I With Triggers | : a. AT1, ATWS requiring RPV water level to be lowered, no Blowdown | ||
: a. Malfunctions | : 5. Technical Specifications | ||
: 1) CT01 B, CT Pump 112 Trip 2) HV01 B, Reactor Building Exhaust Fan Trip 12 3) RM51A, PRM Steam Line Rad Mon 111, Norm Malfunction, FV=O 4) CW19, RBCLC Temperature Controller | : a. TS 3.1.8 (b), TS 3.6.2 (h) | ||
: 6. EAL Classification | |||
: 2) RP02, Rx Trip Bus 141 Pwr Source, FV=maint | : a. Site Area Emergency per EAL SS3.1 - An automatic Scram failed to shut down the reactor as indicated by reactor power >6% AND Manual actions taken at the reactor control console failed to shut down the reactor as indicated by reactor power >6% | ||
: 3) MS05, FW Htr String 12 Reset, FV=reset | : 7. Special Orders | ||
: 4) MS02, HP FW Htr 125 Reset, FV=reset | : a. None Page 6 of 28 NRC Scenario 3 March 2015 | ||
: 5) FW24, Removal of HPCI Fuses FU8/FU9, FV=pulled Page 7 of 28 NRC Scenario 3 | |||
_..,,,, Exelon Generation | Exelon Generation B. Initial Conditions | ||
: c. Overrides | : 1. IC Number | ||
: 1) OVR-5s5di307 POS_ 1 1F10/31-03A PULL OU, On (FWIV Failure) | : a. IC-153 | ||
: 2) OVR-5s6di3010 POS_ 1 1F10/31-03A PULL OU, On (FWIV Failure) | : 2. Presets I With Triggers | ||
: d. Annunciators | : a. Malfunctions | ||
: 1) F1-1-8, Fail Off 2) F3-1-4, Fail Off 3) F4-1-1, Fail Off e. Event Triggers | : 1) CT01 B, CT Pump 112 Trip Inserted | ||
==1 &&zdrrarov==1 | : 2) HV01 B, Reactor Building Exhaust Fan Trip 12 Inserted | ||
&&anx bat n15scen3trg20.bat manual scram to achieve full inward rod movement | : 3) RM51A, PRM Steam Line Rad Mon 111, Norm Malfunction, FV=O TRG 1 | ||
: f. Equipment Out of Service | : 4) CW19, RBCLC Temperature Controller Failure, FV=minimum cooling TRG2 | ||
: 1) Containment Spray Pump 112 in PTL with yellow tag 2) Containment Spray suction isolation valve 112 closed with yellow tag 3) Reactor Build Exhaust Fan 12 secured with yellow tag g. Support Documentation | : 5) RP01 B, Reactor Trip Bus Motor Generator Trips 141 TRG4 | ||
: 1) N1-0P-15A section H.9.0, completed through step 9.3 2) RMI and Rod Movement Sheets for sequence exchange | : 6) RD34, Loss of CRD Instrument Air Pres., RT=5:00, FV=20 TRGG | ||
: h. Miscellaneous | : 7) IA01, Loss of Instrument Air, RT=5:00, FV=40 TRGG | ||
: 1) Protect the following equipment: | : 8) RD33A, Control Rod Bank Blocked Bank 1, FV=12 Inserted | ||
EDG 103, PB 103 2) Update Divisional Status Board 3) Secure DW Cooling fan 11 4) Ensure batch file "n15scen3trg20.bat" is in the root batch file directory with the following commands: | : 9) RD33B, Control Rod Bank Blocked Bank 2, FV=12 Inserted | ||
: a. dmf rd33a b. dmf rd33b c. dmf rd33c d. dmf rd33d e. dmf rd33e Page 8 of 28 NRC Scenario 3 March 2015 | : 10) RD33C, Control Rod Bank Blocked Bank 3, FV=18 Inserted | ||
=::rExelon Generation SHIFT TURNOVER INFORMATION ON COMING SHIFT: | : 11) RD33D, Control Rod Bank Blocked Bank 4, FV=12 Inserted | ||
: 12) RD33E, Control Rod Bank Blocked Bank 5, FV=12 Inserted | |||
* Control Panel Walkdown (all panels) (SRO, ROs) PART II: To be reviewed by the oncoming Operator before assuming the shift. | : b. Remotes | ||
: 1) FW01A, Condensate Pump 11 Discharge Valve 50-10, FV=close TRG25 | |||
: 2) RP02, Rx Trip Bus 141 Pwr Source, FV=maint TRG27 | |||
: 3) MS05, FW Htr String 12 Reset, FV=reset TRG 30 | |||
: 4) MS02, HP FW Htr 125 Reset, FV=reset TRG30 | |||
: 5) FW24, Removal of HPCI Fuses FU8/FU9, FV=pulled TRG23 Page 7 of 28 NRC Scenario 3 March 2015 | |||
_..,,,, Exelon Generation | |||
: c. Overrides | |||
: 1) OVR-5s5di307 POS_ 1 1F10/31-03A PULL OU, On (FWIV Failure) Inserted | |||
: 2) OVR-5s6di3010 POS_ 1 1F10/31-03A PULL OU, On (FWIV Failure) Inserted | |||
: d. Annunciators | |||
: 1) F1-1-8, Fail Off TRG10 | |||
: 2) F3-1-4, Fail Off TRG10 | |||
: 3) F4-1-1, Fail Off TRG10 | |||
: e. Event Triggers TRG 20 - Activates when ARI is hzlrp12g1 ==1 &&zdrrarov==1 &&anx bat n15scen3trg20.bat overridden, RPS has been reset stat2(177)==0 and SDV has drained to allow a manual scram to achieve full inward rod movement | |||
: f. Equipment Out of Service | |||
: 1) Containment Spray Pump 112 in PTL with yellow tag | |||
: 2) Containment Spray suction isolation valve 112 closed with yellow tag | |||
: 3) Reactor Build Exhaust Fan 12 secured with yellow tag | |||
: g. Support Documentation | |||
: 1) N1-0P-15A section H.9.0, completed through step 9.3 | |||
: 2) RMI and Rod Movement Sheets for sequence exchange | |||
: h. Miscellaneous | |||
: 1) Protect the following equipment: EDG 103, PB 103 | |||
: 2) Update Divisional Status Board | |||
: 3) Secure DW Cooling fan 11 | |||
: 4) Ensure batch file "n15scen3trg20.bat" is in the root batch file directory with the following commands: | |||
: a. dmf rd33a | |||
: b. dmf rd33b | |||
: c. dmf rd33c | |||
: d. dmf rd33d | |||
: e. dmf rd33e Page 8 of 28 NRC Scenario 3 March 2015 | |||
=::rExelon Generation SHIFT TURNOVER INFORMATION ON COMING SHIFT: IN ID DATE: _T~o~d~a.._y_ __ | |||
PARTI: To be performed by the oncoming Operator before assuming the shift. | |||
* Control Panel Walkdown (all panels) (SRO, ROs) | |||
PART II: To be reviewed by the oncoming Operator before assuming the shift. | |||
* LCO Status (SRO) | * LCO Status (SRO) | ||
* Shift Turnover Information Sheet Evolutions/General Information/Equipment Status: | * Shift Turnover Information Sheet Evolutions/General Information/Equipment Status: | ||
Line 1,621: | Line 2,271: | ||
* Containment Spray pump 112 is out of service for maintenance (Day 1 of planned 2 day window; 15 day LCO per TS 3.3.7.b). | * Containment Spray pump 112 is out of service for maintenance (Day 1 of planned 2 day window; 15 day LCO per TS 3.3.7.b). | ||
* Reactor Building Exhaust Fan 12 is out of service for maintenance. | * Reactor Building Exhaust Fan 12 is out of service for maintenance. | ||
PART Ill: Remarks/Planned Evolutions: | PART Ill: Remarks/Planned Evolutions: | ||
* Shutdown Condensate pump 11 per N1-0P-15A section H.9.0. Then place the control switch in PTL. | * Shutdown Condensate pump 11 per N1-0P-15A section H.9.0. Then place the control switch in PTL. | ||
* Continue the Control Rod Sequence Exchange per RMI. Page 9 of 28 NRC Scenario 3 March 2015 Exelon Generation ATTACHMENT 2: REACTIVITY MANEUVER INSTRUCTION Reactivity Maneuver: | * Continue the Control Rod Sequence Exchange per RMI. | ||
Rod Sequence Exchange Step: 1 I INITIAL CONDITIONS/STEP DESCRIPTION I RE presence required in the Control Room? Yes_ No | Page 9 of 28 NRC Scenario 3 March 2015 | ||
N/A o. Other Comments: | |||
~* Exelon Generation ATTACHMENT 2: REACTIVITY MANEUVER INSTRUCTION Reactivity Maneuver: Rod Sequence Exchange Step: 1 I INITIAL CONDITIONS/STEP DESCRIPTION | |||
,/ | |||
I RE presence required in the Control Room? Yes_ No If YES above, RE presence not required for steps_. | |||
Initial conditions to be verified prior to initiation of step: | |||
Parameter Expected Range Actual Parameter Expected Range Actual Recirc Flow 54 - 58 Mlbm/hr 56 Mlbm/hr Description of Step: | |||
Complete attached rod movement sheets. | |||
Critical parameters to be monitored DURING Step: | |||
Critical parameters not used must be deleted OR marked N/A Critical Parameter Limit Owner Frequency Contingency CTP 1850 MWth RO Continuous Lower recirculation flow or insert last notch RMI evaluated against approved power profile:* N/A o. | |||
Other Comments: | |||
Power may rise to as high as 90% on highest reading APRM by the end of the rod withdrawals. | Power may rise to as high as 90% on highest reading APRM by the end of the rod withdrawals. | ||
Step Prepared by: Alex Reed I Today Step Reviewed by: Jack Dean I Today RE/STA Date RE/STA/SRO Date Approval to perform Step John Aaron I Today Step Completed by: I Shift Manager Date SRO Date Page 10 of 28 NRC Scenario 3 March 2015 | Step Prepared by: Alex Reed I Today Step Reviewed by: Jack Dean I Today RE/STA Date RE/STA/SRO Date Approval to perform Step John Aaron I Today Step Completed by: I Shift Manager Date SRO Date Page 10 of 28 NRC Scenario 3 March 2015 | ||
Generation Shift Turnover Take the Simulator out of freeze before the crew enters for the pre-shift walkdown. | NMP1 ROD MOVEMENT SHEET Insert Step: .l U') | ||
r-1 0 | |||
N | |||
..c FROM: 48 TO: 12 ~ | |||
ro | |||
:a: | |||
Control Rod lntttals I Mow NIChedc: Coopilg FulOut From Ccrnplete (as Expected) Chedc: ug,t Comments To 14-27 48 12 PR NIA NIA 38-27 48 12 PF! | |||
" NIA NIA co N | |||
0 | |||
'l"4 | |||
'l"4 Q) | |||
@ Ol c 0. | |||
ro 0 | |||
+-J m | |||
L | |||
.l!lllill Ta.~--~ .. PFI ""' uti 1C 14 18 ;i:;i: "'O .:JU 34' J8 4;i: "'llO :Kl | |||
(]) lndlvidual confirms rod 51 51 c | |||
(]) | |||
position by raselecti~ rods iorby using 00-7 printout 47 43 47 43 C) 39 39 35 35 c: 31 31 0 | |||
...,J 27 1 2 27 23 23 | |||
~ 19 19 !"") | |||
w 15 11 15 11 0 | |||
"i: | |||
ro c | |||
P~ by Alex Reed De* Tooay 07 07 Q) | |||
,,, Vatted 11y Jake Darrow Date To<ISll 02 06 10 14 18 22 26 30 34 38 42 46 50 03 u | |||
(/) | |||
u er: | |||
z | |||
U1 NMP1 ROD MOYEME'NT SHEET Insert | |||
.-i 0 | |||
Step: 1 N | |||
..c | |||
~ | |||
FROM: 12 TO: 08 ~ | |||
ro Cont'OI Rod lnlials I Mew NJ Check Cooping Full Out From Comments Canplete (as Expected) Check U~t To 14-27 12 08 NIA NIA 38-27 12 08 NIA NIA 00 N | |||
0 N | |||
Q) | |||
: Ol ro c a.. | |||
0 | |||
-I-' | |||
m L | |||
!1_11_111*~ u.:: 00 1C 14 18 .::.:: .::u .ru 34 .,~ 42 46 :ru | |||
(]) lndlvidu!I confirms rod 51 51 c pogftion oy reseledl~ rods Of' by ushg 00-7 printout 47 43 47 43 | |||
(]) | |||
39 39 C) 35 35 c: 31 31 0 | |||
...J 27 1 2 21 23 23 | |||
~ 19 19 M w 15 11 15 11 0 | |||
ro c | |||
Pl8Jl.-d by Alex Reed De* Today 01 07 llt Q) u 03 03 (/) | |||
vade<I by Jake Darrow Data To<IB)' 02 06 10 14 18 22 26 30 34 38 42 46 50 u er:: | |||
z | |||
NMP1 ROD lllO\IEMENT SHEET Withdrawal Step: 1 LI) | |||
.-i 0 | |||
FROM: 04 TO: 08 N | |||
..s::: | |||
~ | |||
Control Rod Initials I Mo'1e NI Check CoupliflD Full OJt ro F1u111 Cumnienl~ ~ | |||
Complete (as ::xpectec) Check Ligtl: | |||
Tc 18-35 04 08 N/A NIA 34-35 04 08 NIA N/A 34-19 04 08 N/A N/A 18-19 04 08 N/A NIA GO N | |||
0 M | |||
'l"'I Q) | |||
@ Ol c 1>ila1uona1 uua11ne1 U2 U> U 14 18 LL 2.6 3U 34 jt1 42 46 !JO a_ | |||
ro 0 1na1v1aua1 conrrms roo ~1 b1 | |||
+-J (}'.'ISitinn by ff!SP.IP.r.ting roOS 47 47 m | |||
L p: by using 00-7 printout 43 43 39 39 Q) c Q) 35 31 1 2 35 31 27 27 C) 23 23 c: 19 15 4 3 19 15 0 | |||
..J 11 11 | |||
~ | |||
Frepared by Alex Reed Date Tooay 07 07 | |||
-**- M 03 w Varifiad ~ Jak~ 03TOW Ono Tomy 02 00 10 14 18 22 26 10 3.t 38 .42 .46 50 0 ro c | |||
Q) u | |||
(/) | |||
u a:: | |||
''* z | |||
=~Exelon Generation Shift Turnover Take the Simulator out of freeze before the crew enters for the pre-shift walkdown. | |||
* Verify annunciator sound turned on | * Verify annunciator sound turned on | ||
* If recording | * If recording scenario, start the recording device during the pre-shift walkdown Allow no more than 5 minutes to walkdown the Crew panels. | ||
* Walkdown panels | * Walkdown panels | ||
* Conduct shift turnover brief | * Conduct shift turnover brief | ||
* Assume the shift Page 14 of 28 NRC Scenario 3 March 2015 Exelon Generation Event #1: Shutdown Condensate Pump 11 | * Assume the shift Page 14 of 28 NRC Scenario 3 March 2015 | ||
Exelon Generation Event #1: Shutdown Condensate Pump 11 | |||
* The crew will shutdown Condensate Pump 11 and places in PTL SRO | * The crew will shutdown Condensate Pump 11 and places in PTL SRO | ||
* Directs shutdown of Condensate pump 11 per N1-0P-15A, Section H.9.0 | * Directs shutdown of Condensate pump 11 per N1-0P-15A, Section H.9.0 | ||
Line 1,649: | Line 2,379: | ||
* Monitors plant parameters BOP | * Monitors plant parameters BOP | ||
* Acknowledges direction to shutdown Condensate pump 11 Role Play: When directed to slowly close 50-10, | * Acknowledges direction to shutdown Condensate pump 11 Role Play: When directed to slowly close 50-10, | ||
* Notifies SRO to enter LCO for HPCI acknowledge order, wait approximately 1 minute and | * Notifies SRO to enter LCO for HPCI acknowledge order, wait approximately 1 minute and insert remote: | ||
* Monitors Feedwater Booster pump suction | * Monitors Feedwater Booster pump suction pressure (computer point D454 - 123 psig) | ||
* Directs operator in field to slowly close 50-10, BV FW01A, Condensate Pump 11 Discharge Valve 50--COND PMP 11 DISCHARGE 10, FV=close | * Directs operator in field to slowly close 50-10, BV FW01A, Condensate Pump 11 Discharge Valve 50- - COND PMP 11 DISCHARGE 10, FV=close | ||
* WHEN the Condensate Pump 11 discharge valve TRG25 is 90% closed, places the pump control switch in PTL Then report 50-10 is 90% closed. | * WHEN the Condensate Pump 11 discharge valve TRG25 is 90% closed, places the pump control switch in PTL Then report 50-10 is 90% closed. | ||
* Verifies: | * Verifies: | ||
* Maximum Condensate pump motor current :5 135 amps | * Maximum Condensate pump motor current :5 135 amps | ||
* Minimum FW Booster pump suction pressure Role Play: If contacted as operator to report local within the acceptable range of curve shown in FW pump suction pressure, immediately report FW OP-15C attachment 4 (minimum pressure at pump suction pressure based on simulator value of 85% flow (-6 mlbs/hr) is 72 psig) FWBP discharge pressure minus 50 psig (-300 psi). | * Minimum FW Booster pump suction pressure Role Play: If contacted as operator to report local within the acceptable range of curve shown in FW pump suction pressure, immediately report FW OP-15C attachment 4 (minimum pressure at pump suction pressure based on simulator value of 85% flow (-6 mlbs/hr) is 72 psig) | ||
* Minimum FW pump suction pressure 200 psig Role Play: When directed to fully close 50-10, | FWBP discharge pressure minus 50 psig (-300 psi). | ||
* Directs operator in field to fully close 50-10, BV -acknowledge order, wait approximately 15 seconds COND PMP 11 DISCHARGE and report valve is fully closed. | * Minimum FW pump suction pressure ~ 200 psig Role Play: When directed to fully close 50-10, | ||
* Verifies no abnormal Main Condenser air in-leakage is occurring Page 15 of 28 NRC Scenario 3 March 2015 Exelon Generation | * Directs operator in field to fully close 50-10, BV - | ||
acknowledge order, wait approximately 15 seconds COND PMP 11 DISCHARGE and report valve is fully closed. | |||
* Verifies no abnormal Main Condenser air in-leakage is occurring Page 15 of 28 NRC Scenario 3 March 2015 | |||
Exelon Generation | |||
* The crew will perform a rod sequence exchange SRO Note: Lead examiner may move to the next event | * The crew will perform a rod sequence exchange SRO Note: Lead examiner may move to the next event | ||
* Directs performance of Control Rod Sequence once sufficient action is observed on the reactivity Exchange per RMI and N1-0P-5 manipulation. | * Directs performance of Control Rod Sequence once sufficient action is observed on the reactivity Exchange per RMI and N1-0P-5 manipulation. | ||
* Provides oversight for reactivity manipulation RO | * Provides oversight for reactivity manipulation RO | ||
* Acknowledges direction from SRO Note: RMI includes rods 14-27, 38-27, 18-35, 34-35, | * Acknowledges direction from SRO Note: RMI includes rods 14-27, 38-27, 18-35, 34-35, | ||
* Obtains copy of RMI 34-19, and 18-19 Withdraws control rods per rod movement sheets | * Obtains copy of RMI 34-19, and 18-19 | ||
* Withdraws control rods per rod movement sheets and N1-0P-5 | |||
* Turns control rod power on | * Turns control rod power on | ||
* Selects rod | * Selects rod | ||
Line 1,671: | Line 2,405: | ||
* Monitors Feedwater controls for proper response | * Monitors Feedwater controls for proper response | ||
* FWP 13 FCV responding to power change | * FWP 13 FCV responding to power change | ||
* RPV water level remains within program band (65" -83") Page 16 of 28 NRC Scenario 3 March 2015 Exelon Generation Event #3: Main Steam Line Radiation Monitor Failure | * RPV water level remains within program band (65" - 83") | ||
Page 16 of 28 NRC Scenario 3 March 2015 | |||
Exelon Generation Event #3: Main Steam Line Radiation Monitor Failure | |||
* A MSL Rad monitor will fail inoperable | * A MSL Rad monitor will fail inoperable | ||
* The CRS will address Tech Specs When directed by the examiner, insert malfunction: | * The CRS will address Tech Specs When directed by the examiner, insert malfunction: CREW RM51A, PRM Steam Line Rad Mon 111, Norm | ||
CREW | * Acknowledge/report Annunciator F1-2-7, MAIN Malfunction, FV=O STEAM RAD MONITOR CH 11 HI/LO TRG 1 | ||
* Acknowledge/report Annunciator F1-2-7, MAIN | |||
* Diagnose failure of MSL Rad Monitor 111 Expected Annunciator: | * Diagnose failure of MSL Rad Monitor 111 Expected Annunciator: | ||
F1-2-7, MAIN STEAM RAD MONITOR CH 11 HI/LO SRO | F1-2-7, MAIN STEAM RAD MONITOR CH 11 HI/LO SRO | ||
Line 1,682: | Line 2,418: | ||
* Acknowledges MSL Rad Monitor has failed | * Acknowledges MSL Rad Monitor has failed | ||
* Informs WEC, requests investigation of the failure Role Play: When requested to investigate the MSL | * Informs WEC, requests investigation of the failure Role Play: When requested to investigate the MSL | ||
* Enters TS Table 3.6.2.h (requires placing channel rad monitor failure, report that you will begin an in the tripped condition within 12 hours or immediate investigation verifying Mechanical Vacuum pump isolated) | * Enters TS Table 3.6.2.h (requires placing channel rad monitor failure, report that you will begin an in the tripped condition within 12 hours or immediate investigation verifying Mechanical Vacuum pump isolated) | ||
* Briefs crew on failure of MSL Rad Monitor RO | * Briefs crew on failure of MSL Rad Monitor RO | ||
* Monitors plant parameters BOP | * Monitors plant parameters BOP | ||
Line 1,688: | Line 2,424: | ||
* Goes to back panel or checks PPC and determines the other MSL Rad Monitors indicate normal readings | * Goes to back panel or checks PPC and determines the other MSL Rad Monitors indicate normal readings | ||
* Observes downscale light on MSL Rad Monitor Ch 11 and diagnoses the Monitor is INOP | * Observes downscale light on MSL Rad Monitor Ch 11 and diagnoses the Monitor is INOP | ||
* Notifies crew MSL Rad Monitor Ch 11 is INOP Page 17 of 28 NRC Scenario 3 March 2015 | * Notifies crew MSL Rad Monitor Ch 11 is INOP Page 17 of 28 NRC Scenario 3 March 2015 | ||
Generation Event #4: RBCLC Temperature Control Valve Failure | =~Exelon Generation Event #4: RBCLC Temperature Control Valve Failure | ||
* RBCLC TCV fails to minimum cooling | * RBCLC TCV fails to minimum cooling | ||
* Crew responds per N1-SOP-11.1 As directed by lead examiner, insert malfunction: | * Crew responds per N1-SOP-11.1 As directed by lead examiner, insert malfunction: CREW | ||
CREW | * Recognize/report rising RBCLC temperatures CW19, RBCLC Temperature Controller Failure, | ||
* Recognize/report rising RBCLC temperatures CW19, RBCLC Temperature Controller | * Diagnose failure of RBCLC automatic FV=minimum cooling temperature control TRG2 TCV 70-137 closes and bypass opens RBCLC water temperature rises Temperatures of components cooled by RBCLC rise Expected Annunciator: | ||
* Diagnose failure of RBCLC automatic FV=minimum cooling temperature control TRG2 TCV 70-137 closes and bypass opens RBCLC water temperature rises Temperatures of components cooled by RBCLC rise Expected Annunciator: | |||
H1-4-1, R BUILDING COOLING WATER PRESS TEMP MAKEUP FLOW (-4.5 minutes) | H1-4-1, R BUILDING COOLING WATER PRESS TEMP MAKEUP FLOW (-4.5 minutes) | ||
SRO | SRO | ||
Line 1,704: | Line 2,438: | ||
* Directs manual control of RBCLC temperature RO | * Directs manual control of RBCLC temperature RO | ||
* Monitor plant parameters | * Monitor plant parameters | ||
* Monitor RRPs and other components cooled by RBCLC Page 18 of 28 NRC Scenario 3 March 2015 Exelon Generation Event 4 continued | * Monitor RRPs and other components cooled by RBCLC Page 18 of 28 NRC Scenario 3 March 2015 | ||
* Executes ARP H1-4-1 | Exelon Generation Event 4 continued BOP | ||
* May enter N1-SOP-11.1, RBCLC Failure | * Executes ARP H1-4-1 Note: | ||
* Monitors equipment cooled by RBCLC | * May enter N1-SOP-11.1, RBCLC Failure Crew may recognize failure of TBCLC temperature | ||
* Places RBCLC Temperature Controller 70-238 in manual (N1-0P-11, Section H.13 may be referenced) | * Monitors equipment cooled by RBCLC controller prior to the annunciator alarming, and may | ||
* Places RBCLC Temperature Controller 70-238 in take manual control without referencing the ARP. manual (N1-0P-11, Section H.13 may be referenced) | |||
* Depress the AIM Button until red LED is illuminated next to "M" | * Depress the AIM Button until red LED is illuminated next to "M" | ||
* Turns knurled knob as required to open/close RBCLC TCV | * Turns knurled knob as required to open/close RBCLC TCV | ||
* Manually adjust RBCLC Temperature Controller to maintain RBCLC temp between 57°F and 95°F Page 19 of 28 NRC Scenario 3 March 2015 Exelon Generation Event #5: RPS MG Set 141 Trip | * Manually adjust RBCLC Temperature Controller to maintain RBCLC temp between 57°F and 95°F Page 19 of 28 NRC Scenario 3 March 2015 | ||
* RPS MG Set 141 trips causing a half scram on RPS 12. As directed by the examiner, insert malfunction: | |||
CREW | Exelon Generation Event #5: RPS MG Set 141 Trip | ||
* RPS MG Set 141 trips causing a half scram on RPS 12. | |||
As directed by the examiner, insert malfunction: CREW | |||
* Recognize/report RPS 12 half scram RP01 B, Reactor Trip Bus Motor Generator Trips 141 | * Recognize/report RPS 12 half scram RP01 B, Reactor Trip Bus Motor Generator Trips 141 | ||
* Diagnose trip of RPS MG set 141 TRG4 Scram solenoid lights for RPS 12 de-energize SRO Feedwater temperature slowly lowers | * Diagnose trip of RPS MG set 141 TRG4 Scram solenoid lights for RPS 12 de-energize SRO Feedwater temperature slowly lowers Reactor power slowly rises | ||
* Expected annunciators: | * Acknowledges reports Expected annunciators: (Immediate) | ||
(Immediate) | * Directs execution of ARP F4-3-2 F4-3-2, RX. TRIP BUS M-G SET 141 TROUBLE F4-3-8, RPS CH 12 MAN REACTOR TRIP | ||
* Directs execution of ARP F4-3-2 F4-3-2, RX. TRIP BUS M-G SET 141 TROUBLE | * Directs entry into OP-48, H.5 F4-2-8, RPS CH 12 AUTO REACTOR TRIP | ||
* F4-2-8, RPS CH 12 AUTO REACTOR TRIP | |||
* Directs entry into SOP-16.1 for loss of Feedwater heating | * Directs entry into SOP-16.1 for loss of Feedwater heating | ||
* May direct emergency power reduction per SOP-1.1 if needed to control Feedwater temperatures or Reactor power | * May direct emergency power reduction per SOP-1.1 if needed to control Feedwater temperatures or Reactor power | ||
Line 1,726: | Line 2,462: | ||
* Monitors plant parameters | * Monitors plant parameters | ||
* Lowers power per SOP-1.1 as required to control Feedwater temperatures or Reactor power | * Lowers power per SOP-1.1 as required to control Feedwater temperatures or Reactor power | ||
* Resets half scram Role Play: When dispatched as operator to BOP investigate problem with MG Set 141, wait two | * Resets half scram Role Play: When dispatched as operator to BOP investigate problem with MG Set 141, wait two minutes then report that you can smell burnt | ||
* Executes ARP F4-3-2 | * Executes ARP F4-3-2 insulation in the vicinity of MG Set 141 motor. Report | ||
* Dispatches an operator to investigate MG Set that the drive motor breaker tripped on overcurrent. | * Dispatches an operator to investigate MG Set that the drive motor breaker tripped on overcurrent. If 141 asked, report no overvoltage trip occurred. | ||
If 141 asked, report no overvoltage trip occurred. | |||
* Determines I & C Bus 130A is available | * Determines I & C Bus 130A is available | ||
* Obtains SRO permission to perform dead bus transfer of Reactor Trip Bus 141 Page 20 of 28 NRC Scenario 3 March 2015 Exelon Generation Event 5 Continued Role Play: When dispatched as operator to transfer Reactor Trip Bus 141 to l&C Bus 130A, wait 2 minutes and insert remote: RP02, Rx Trip Bus 141 Pwr Source, FV=maint | * Obtains SRO permission to perform dead bus transfer of Reactor Trip Bus 141 Page 20 of 28 NRC Scenario 3 March 2015 | ||
Exelon Generation Event 5 Continued BOP Continued Role Play: When dispatched as operator to transfer | |||
* Dispatches an operator to perform dead bus Reactor Trip Bus 141 to l&C Bus 130A, wait 2 transfer of Reactor Trip Bus 141 per OP-48 minutes and insert remote: section H.5.0 RP02, Rx Trip Bus 141 Pwr Source, FV=maint | |||
* Enters SOP-16.1 due to loss of Feedwater heating | * Enters SOP-16.1 due to loss of Feedwater TRG27 heating | ||
* Monitors Feedwater temperatures | * Monitors Feedwater temperatures Then report Reactor Trip Bus 141 has been re- | ||
* Acknowledges that Reactor Trip Bus 141 is energized | * Acknowledges that Reactor Trip Bus 141 is re-energized from l&C Bus 130A, and that half scram energized and Feedwater heaters can be reset. | ||
* Coordinates with RO to reset half scram | * Coordinates with RO to reset half scram | ||
* Dispatches operator to reset Feedwater heaters Page 21 of 28 NRC Scenario 3 March 2015 Exelon Generation Event #6: Instrument Air Leak | * Dispatches operator to reset Feedwater heaters Role Play: When dispatched as operator to reset Feedwater heaters, wait 2 minutes and insert remotes: | ||
* Lowering Instrument Air pressure and CRD air pressure leads to a manual reactor Scram. As directed by lead examiner, insert malfunctions: | MS05, FW Htr String 12 Reset, FV=reset MS02, HP FW Htr 125 Reset, FV=reset TRG 30 Then report 12 Feedwater heaters have been reset. | ||
CREW | Page 21 of 28 NRC Scenario 3 March 2015 | ||
* Recognizes/reports lowering instrument air RD34, Loss of CRD Instrument Air Pres, RT=5:00, FV=20 | |||
* Observes start of standby IAC TRG6 Instrument air pressure lowers SRO Backup Instrument Air Compressor | Exelon Generation Event #6: Instrument Air Leak | ||
(/AC) loads | * Lowering Instrument Air pressure and CRD air pressure leads to a manual reactor Scram. | ||
(/AC) starts | As directed by lead examiner, insert malfunctions: CREW | ||
* CRD air pressure lowers -Reaches 60# at -4 minutes | * Recognizes/reports lowering instrument air RD34, Loss of CRD Instrument Air Pres, RT=5:00, pressure FV=20 IA01, Loss of Instrument Air, RT=5:00, FV=40 | ||
* Observes start of standby IAC TRG6 Instrument air pressure lowers SRO Backup Instrument Air Compressor (/AC) loads Standby Instrument Air Compressor (/AC) starts | |||
* Acknowledges reports CRD air pressure lowers - Reaches 60# at -4 minutes | |||
* Directs execution of ARP F3-3-2 Expected Annunciators: | * Directs execution of ARP F3-3-2 Expected Annunciators: | ||
L1-4-7, INST AIR BACK-UP VALVE OPEN | |||
* F3-3-2, CRD CONTROL AIR PRESSURE HI-LO (-2 min) | * May direct entry into SOP-20.1 F3-3-2, CRD CONTROL AIR PRESSURE HI-LO (-2 min) | ||
* May direct execution of ARP L 1-4-7 | * May direct execution of ARP L 1-4-7 | ||
* Acknowledges CRD air pressure | * Acknowledges CRD air pressure < 60 psig | ||
< 60 psig | |||
* Directs manual Reactor scram (CT-1.0) | * Directs manual Reactor scram (CT-1.0) | ||
* Acknowledges scram report RO | * Acknowledges scram report RO | ||
* Monitors plant parameters | * Monitors plant parameters | ||
* Places Mode Switch in SHUTDOWN (CT-1.0) | * Places Mode Switch in SHUTDOWN (CT-1.0) | ||
* Provides scram report BOP Role Play: When directed as operator check for air | * Provides scram report BOP Role Play: When directed as operator check for air leaks, acknowledge order. Wait 2 minutes and report | ||
* Executes ARP F3-3-2 air leakage on Reactor Building 237' West, near the | |||
* HCUs and it cannot be isolated. | * If directed executes ARP L 1-4-7 HCUs and it cannot be isolated. | ||
* Dispatches Operator to check for air leaks | * Dispatches Operator to check for air leaks | ||
* Monitors CRD air pressure | * Monitors CRD air pressure | ||
* Reports when CRD air pressure lowers below 60 psig Page 22 of 28 NRC Scenario 3 March 2015 | * Reports when CRD air pressure lowers below 60 psig Page 22 of 28 NRC Scenario 3 March 2015 | ||
/11811r Exelon Generation Events #7 and #8: ATWS with Failure of FW Isolation Valves to Isolate | |||
/11811r Exelon Generation Events #7 and #8: ATWS with Failure of FW Isolation Valves to Isolate | |||
* ATWS with Failure of FW Isolation Valves to Isolate | * ATWS with Failure of FW Isolation Valves to Isolate | ||
* Crew responds per N1-EOP-3 Verify the following malfunctions are preset: CREW RD33A, Control Rod Bank Blocked Bank 1, FV=12 | * Crew responds per N1-EOP-3 Verify the following malfunctions are preset: CREW RD33A, Control Rod Bank Blocked Bank 1, FV=12 | ||
* Diagnose failure of control rods to insert RD33B, Control Rod Bank Blocked Bank 2, FV=12 | * Diagnose failure of control rods to insert RD33B, Control Rod Bank Blocked Bank 2, FV=12 RD33C, Control Rod Bank Blocked Bank 3, FV=18 | ||
* Diagnose Reactor power above 6% | |||
RD33D, Control Rod Bank Blocked Bank 4, FV=12 RD33E, Control Rod Bank Blocked Bank 5, FV=12 Control rods partially insert Reactor power remains > 6% | |||
SRO | |||
* Enters EOP-2, RPV Control, due to Reactor power above 6% when scram required | * Enters EOP-2, RPV Control, due to Reactor power above 6% when scram required | ||
* Answers "Are all rods inserted to at least position 04?" NO | * Answers "Are all rods inserted to at least position 04?" NO | ||
Line 1,775: | Line 2,514: | ||
* Directs prevention of Core Spray injection per EOP-1 att 4 | * Directs prevention of Core Spray injection per EOP-1 att 4 | ||
* May enter EOP-4 on high torus temperature | * May enter EOP-4 on high torus temperature | ||
* Directs lockout of Containment Spray pumps except pump(s) used for torus cooling Page 23 of 28 NRC Scenario 3 March 2015 | * Directs lockout of Containment Spray pumps except pump(s) used for torus cooling Page 23 of 28 NRC Scenario 3 March 2015 | ||
=::"Exelon Generation Events 7 and 8 continued SRO Continued EOP-3 Level Leg Actions: | |||
=::"Exelon Generation Events 7 and 8 continued SRO Continued EOP-3 Level Leg Actions: | |||
* Directs bypass of low-low RPV water level MSIV isolation per EOP-1 att 2 | * Directs bypass of low-low RPV water level MSIV isolation per EOP-1 att 2 | ||
* Determines Reactor power is above 6% and RPV water level is above -41 inches | * Determines Reactor power is above 6% and RPV water level is above -41 inches | ||
* Directs terminate and prevent of all RPV injection except boron and CRD per EOP-1 att 24 (CT-2.0) | * Directs terminate and prevent of all RPV injection except boron and CRD per EOP-1 att 24 (CT-2.0) | ||
* Directs RPV level lowered to at least -41 inches | * Directs RPV level lowered to at least -41 inches | ||
* Directs RPV water level controlled | * Directs RPV water level controlled -109 to -41 inches with Condensate/FW and CRD EOP-3 Pressure Leg Actions: | ||
-109 to -41 inches with Condensate/FW and CRD EOP-3 Pressure Leg Actions: | |||
* If any ERV is cycling: | * If any ERV is cycling: | ||
* Directs initiation of Emergency Condensers | * Directs initiation of Emergency Condensers | ||
* Directs ERVs opened to lower RPV pressure to less than 965 psig | * Directs ERVs opened to lower RPV pressure to less than 965 psig | ||
* Directs RPV pressure controlled below 1080 psig using TBVs, ECs and/or ERVs | * Directs RPV pressure controlled below 1080 psig using TBVs, ECs and/or ERVs | ||
* Monitors Figure M, Heat Capacity Temperature Limit Page 24 of 28 NRC Scenario 3 March 2015 | * Monitors Figure M, Heat Capacity Temperature Limit Page 24 of 28 NRC Scenario 3 March 2015 | ||
_..,.. Exelon Generation Events 7 and 8 continued SRO continued EOP-3 Power Leg Actions: | |||
_..,.. Exelon Generation Events 7 and 8 continued SRO continued EOP-3 Power Leg Actions: | |||
* Directs initiation of ARI | * Directs initiation of ARI | ||
* Answers "Is the Turbine Generator On-line?" | * Answers "Is the Turbine Generator On-line?" NO | ||
NO | |||
* Answers "Reactor power?" Above 6% | * Answers "Reactor power?" Above 6% | ||
* Directs Recirc pumps verified tripped | * Directs Recirc pumps verified tripped | ||
Line 1,801: | Line 2,540: | ||
* Depresses RPS pushbuttons | * Depresses RPS pushbuttons | ||
* Initiates ARI | * Initiates ARI | ||
* Bypasses Core Spray IV interlocks per N1-EOP-1 Att4 by installing six jumpers (17, 18, 19, 24, 25, 26) inside Panel N | * Bypasses Core Spray IV interlocks per N1-EOP-1 Att4 by installing six jumpers (17, 18, 19, 24, 25, | ||
* Bypasses low-low RPV water level MSIV isolation per EOP-1 att 2 by installing four jumpers (1, 2, 8, 9) inside Panel N | : 26) inside Panel N | ||
* Bypasses low-low RPV water level MSIV isolation per EOP-1 att 2 by installing four jumpers (1, 2, 8, | |||
: 9) inside Panel N | |||
* Performs EOP-3. 1, Section 3 (driving rods) and/or 4 (manual scrams) (see actions below) | * Performs EOP-3. 1, Section 3 (driving rods) and/or 4 (manual scrams) (see actions below) | ||
* Inserts SRMs | * Inserts SRMs | ||
Line 1,808: | Line 2,549: | ||
* Controls IRM recorders and range switches as required to monitor power | * Controls IRM recorders and range switches as required to monitor power | ||
* Reports when APRMs are < 6% | * Reports when APRMs are < 6% | ||
* Reports status of control rod insertion Page 25 of 28 NRC Scenario 3 March 2015 Events 7 and 8 continued | * Reports status of control rod insertion Page 25 of 28 NRC Scenario 3 March 2015 | ||
* Verify a CRD Pump running | |||
* Place Reactor Mode Switch in REFUEL Place ARI OVERRIDE switch in OVERRIDE | Events 7 and 8 continued RO Continued Possible EOP-3.1 Section 3 Actions: | ||
* Installed RPS jumpers (5, 6, 12, 13) Note: RO will likely have to fully open the CRD flow | * Verify a CRD Pump running Note: Control rods will successfully insert using | ||
* Place Reactor Mode Switch in REFUEL RMCS. | |||
* Place ARI OVERRIDE switch in OVERRIDE | |||
* Installed RPS jumpers (5, 6, 12, 13) | |||
Note: RO will likely have to fully open the CRD flow | |||
* Reset the scram control valve and/or close 44-04 in order to achieve | * Reset the scram control valve and/or close 44-04 in order to achieve | ||
* Insert rods to 00 using EMER ROD IN starting rod movement via RMCS; these methods are preferential to closing 44-167 due to ability to perform | * Insert rods to 00 using EMER ROD IN starting rod movement via RMCS; these methods are with high power regions of core (use LPRM preferential to closing 44-167 due to ability to perform indications) (CT-3.0) from the control room and not preventing further | ||
* If more drive pressure is required, then perform scram attempts by blocking the charging water one of more of the following: | |||
header. | |||
* If more drive pressure is required, then perform one of more of the following: | |||
* Fully open CRD Flow Control Valve (F panel) | * Fully open CRD Flow Control Valve (F panel) | ||
* Close 44-04, Control Rod Drive Water Cont V (F Panel) | * Close 44-04, Control Rod Drive Water Cont V (F Panel) | ||
* Close 44-167, Charging Water Header Blocking Valve (RB 237') Possible EOP-3.1 Section 4 Actions: | * Close 44-167, Charging Water Header Note: When ARI is overridden, the scram is reset, Blocking Valve (RB 237') | ||
and annunciator F4-1-1 clears, then TRG 20 will activate. Verify this occurs and the RD33 malfunctions all delete. This allows all control rods Possible EOP-3.1 Section 4 Actions: | |||
to insert on the next manual scram attempt. | |||
* Place ARI OVERRIDE switch in OVERRIDE | * Place ARI OVERRIDE switch in OVERRIDE | ||
* Installed RPS jumpers (5, 6, 12, 13) | * Installed RPS jumpers (5, 6, 12, 13) | ||
* Reset the scram | As directed by the examiner, if it's desired to 'time | ||
* Verify open 44-167, Charging Water Header Blocking Valve (RB 237') | * Reset the scram compress' scramming to all rods in, insert TRG 10 to | ||
* When the SDV is drained, then initiate a manual scram (CT-3.0) | * Verify open 44-167, Charging Water Header fail off appropriate annunciators and insert TRG 20 Blocking Valve (RB 237') | ||
Page 26 of 28 NRC Scenario 3 March 2015 Exelon Generation Events 7 and 8 continued | to remove A TWS malfunctions all AFTER verifying | ||
* When the SDV is drained, then initiate a the scram is reset. manual scram (CT-3.0) | |||
Page 26 of 28 NRC Scenario 3 March 2015 | |||
~p Exelon Generation Events 7 and 8 continued BOP | |||
* Bypasses ADS | * Bypasses ADS | ||
* Terminates and prevents all injection except boron and CRD per N1-EOP-1 Att 24 (CT-2.0): | * Terminates and prevents all injection except boron and CRD per N1-EOP-1 Att 24 (CT-2.0): | ||
* Attempts to close both FEEDWATER Role Play: When directed as PO to pull HPCI fuses ISOLATION Valves 11 and 12 FU-8 and FU-9, wait one minute and insert remote: | |||
* Attempts to close both FEEDWATER ISOLATION Valves 11 and 12 | |||
* Determines FWIVs will not close and places FWPs in PTL. | * Determines FWIVs will not close and places FWPs in PTL. | ||
* Selects Manual on 11, 12 and 13 FWP Valve Control selector switches | FW24, Removal of HPCI Fuses FU8/FU9, | ||
* Closes 11, 12 and 13 Feedwater FCV (Knurled Knob) full counterclockwise | * Selects Manual on 11, 12 and 13 FWP Valve FV=pulled Control selector switches TRG23 | ||
* Directs PO to remove fuses FU-8 and FU-9 from Panel IS34 in the Aux Control Room | * Closes 11, 12 and 13 Feedwater FCV (Knurled Knob) full counterclockwise Then report that HPCI fuses FU-8 and FU-9 have | ||
* Directs PO to remove fuses FU-8 and FU-9 been pulled from Panel IS34 in the Aux Control Room | |||
* Verifies closed, FEEDWATER PUMP 13 BLOCKING VALVE | * Verifies closed, FEEDWATER PUMP 13 BLOCKING VALVE | ||
* Verifies in MAN, FWP 11 BYPASS VALVE, AND set to zero output | * Verifies in MAN, FWP 11 BYPASS VALVE, AND set to zero output | ||
* Verifies in MAN, FWP 12 BYPASS VALVE, AND set to zero output Informs SRO when RPV water level reaches -41 inches Page 27 of 28 NRC Scenario 3 March 2015 | * Verifies in MAN, FWP 12 BYPASS VALVE, AND set to zero output | ||
* Informs SRO when RPV water level reaches -41 inches Page 27 of 28 NRC Scenario 3 March 2015 | |||
Generation Copy of __ Training Id: NRC 2015 Scenario 4 Revision: | =~Exelon Generation Copy of __ | ||
0.0 Restore RRP to Service, Loss of Reactor Building Ventilation, RRMG M/ A Station Failure, Steam Line Break in the Drywell, Failure of Title: HPCI, Containment Spray Pump Trip | Training Id: NRC 2015 Scenario 4 Revision: 0.0 Restore RRP to Service, Loss of Reactor Building Ventilation, RRMG M/ A Station Failure, Steam Line Break in the Drywell, Failure of | ||
_.,,..,. | |||
Exelon Generation References N1-0P-1, Nuclear Steam Supply System N1-0P-43B, Normal Power Operations N1-0P-10, Reactor Building | ==Title:== | ||
HPCI, Containment Spray Pump Trip Signature I Printed Name Developed By ~~Paul Isham 6/2/14 Validated By Pat O'Brien 8/20/14 Leigh Mason 8/20/14 Dave Ballard 8/20/14 Facility Reviewer Greg Elkins Page 1 of 25 NRC Scenario 4 March 2015 | |||
_.,,..,. Exelon Generation References N1-0P-1, Nuclear Steam Supply System N1-0P-43B, Normal Power Operations N1-0P-10, Reactor Building Heating, Cooling, and Ventilation System N1-SOP-1.3, Recirc Pump Trip at Power N 1-SOP-1 , Reactor Scram N1-EOP-2, RPV Control N1-EOP-4, Primary Containment Control N 1-EOP-5, Secondary Containment Control N1-EOP-1, NMP1 EOP Support Procedure N1-EOP-8, RPV Slowdown Unit 1 Technical Specifications Page 2 of 25 NRC Scenario 4 March 2015 | |||
Exelon Generation Instructor Information A. Scenario Description Sequence of Events I Expected Crew Response: | |||
The crew assumes the shift with the plant operating at 90% power and four recirculation loops in service. | The crew assumes the shift with the plant operating at 90% power and four recirculation loops in service. | ||
Containment Spray pump 112 and Reactor Building Exhaust Fan 12 are out of service for maintenance. | Containment Spray pump 112 and Reactor Building Exhaust Fan 12 are out of service for maintenance. | ||
Immediately after assuming the shift the crew will be directed to restore Recirculation Pump 11 to service and return to full power. The crew will assess plant conditions and lower power with Recirculation Flow until flow is less than 50 Mlbm/hr. | Immediately after assuming the shift the crew will be directed to restore Recirculation Pump 11 to service and return to full power. The crew will assess plant conditions and lower power with Recirculation Flow until flow is less than 50 Mlbm/hr. They will then return Recirculation Pump 11 to service. | ||
They will then return Recirculation Pump 11 to service. | After the crew has placed the recirc pump in service, #11 RB exhaust fan will trip. The crew will diagnose the fan trip and a positive RB pressure. With #12 RB exhaust fan OOS, the crew will start the Reactor Building Emergency Ventilation System (RBEVS) to restore a negative RB pressure. Entry into N1-EOP-5, Secondary Containment Control is required. SRO determines the secondary containment TS is still satisfied. | ||
After the crew has placed the recirc pump in service, | Next, RRP 15 flow rises due to a blind controller failure. The crew will take the M/A station to manual, and the rise will stop. RRMG 15 will develop a high slot temperature, requiring the crew to remove it from service. | ||
#11 RB exhaust fan will trip. The crew will diagnose the fan trip and a positive RB pressure. | A steam leak will then develop in the Primary Containment. The crew will insert a scram. Following the scram, HPCI will fail to initiate, requiring manual action to establish injection with preferred and/or alternate injection systems to maintain RPV water level (Critical Task). | ||
With #12 RB exhaust fan OOS, the crew will start the Reactor Building Emergency Ventilation System (RBEVS) to restore a negative RB pressure. | When the crew attempts to spray the Containment, Containment Spray pump 111 will trip. The two remaining Containment Spray pumps will be insufficient to avoid violating PSP, and the crew will perform an RPV Blowdown (Critical Task). | ||
Entry into N1-EOP-5, Secondary Containment Control is required. | : 1. Termination Criteria | ||
SRO determines the secondary containment TS is still satisfied. | : a. RPV water level controlled in assigned band, RPV Blowdown in progress, Primary Containment pressure controlled per N1-EOP-1 attachment 17 Page 3 of 25 NRC Scenario 4 March 2015 | ||
Next, RRP 15 flow rises due to a blind controller failure. | |||
The crew will take the M/A station to manual, and the rise will stop. RRMG 15 will develop a high slot temperature, requiring the crew to remove it from service. | Exelon Generation | ||
A steam leak will then develop in the Primary Containment. | : 2. Critical Tasks CT-1, Given a LOCA in the Drywell and a failure of HPCI to initiate, the crew will inject with preferred and alternate injection systems to restore and maintain RPV water level above -84 inches, in accordance with N1-EOP-2 Justification: | ||
The crew will insert a scram. Following the scram, HPCI will fail to initiate, requiring manual action to establish injection with preferred and/or alternate injection systems to maintain RPV water level (Critical Task). When the crew attempts to spray the Containment, Containment Spray pump 111 will trip. The two remaining Containment Spray pumps will be insufficient to avoid violating PSP, and the crew will perform an RPV Blowdown (Critical Task). 1. Termination Criteria | Safety Significance: Maintaining Reactor water level above -84 inches ensures adequate core cooling through the preferred method of core submergence. This protects the integrity of the fuel cladding. | ||
: a. RPV water level controlled in assigned band, RPV Blowdown in progress, Primary Containment pressure controlled per N1-EOP-1 attachment 17 Page 3 of 25 NRC Scenario 4 March 2015 Exelon Generation | Cueing: Multiple Reactor water level indicators and annunciators will provide indications of lowering Reactor water level. | ||
: 2. Critical Tasks CT-1, Given a LOCA in the Drywell and a failure of HPCI to initiate, the crew will inject with preferred and alternate injection systems to restore and maintain RPV water level above -84 inches, in accordance with N1-EOP-2 Justification: | N1-EOP-2 provides multiple procedure steps directing injection with preferred and alternate injection systems. | ||
Safety Significance: | Measurable Performance Indicators: Manipulation of pumps and/or valves in the preferred or alternate injection system(s) will provide observable actions for the evaluation team. | ||
Maintaining Reactor water level above -84 inches ensures adequate core cooling through the preferred method of core submergence. | Performance Feedback: Multiple Reactor water level indicators and annunciators will provide performance feedback regarding the success of injection with preferred and alternate injection systems. | ||
This protects the integrity of the fuel cladding. | |||
Cueing: Multiple Reactor water level indicators and annunciators will provide indications of lowering Reactor water level. N1-EOP-2 provides multiple procedure steps directing injection with preferred and alternate injection systems. Measurable Performance Indicators: | |||
Manipulation of pumps and/or valves in the preferred or alternate injection system(s) will provide observable actions for the evaluation team. Performance Feedback: | |||
Multiple Reactor water level indicators and annunciators will provide performance feedback regarding the success of injection with preferred and alternate injection systems. | |||
CT-2, Given a LOCA in the Drywell and degraded Containment Spray capability, the crew will execute N1-EOP-8, RPV Slowdown, when it is determined Torus pressure cannot be maintained below the Pressure Suppression Pressure limit, in accordance with N1-EOP-4. | CT-2, Given a LOCA in the Drywell and degraded Containment Spray capability, the crew will execute N1-EOP-8, RPV Slowdown, when it is determined Torus pressure cannot be maintained below the Pressure Suppression Pressure limit, in accordance with N1-EOP-4. | ||
Justification: | Justification: | ||
Safety Significance: | Safety Significance: A Blowdown is required to limit further release of energy into the Primary Containment and to ensure that the RPV is depressurized while pressure suppression capability is still available. This protects the integrity of the Primary Containment. | ||
A Blowdown is required to limit further release of energy into the Primary Containment and to ensure that the RPV is depressurized while pressure suppression capability is still available. | Cueing: Multiple Primary Containment pressure indicators and annunciators will provide indications. N1-EOP-4 provides direction to monitor the Pressure Suppression Pressure limit and blowdown if required. | ||
This protects the integrity of the Primary Containment. | Measurable Performance Indicators: The crew will manually open valves to initiate Emergency Condensers. The crew will manually open ERVs. | ||
Cueing: Multiple Primary Containment pressure indicators and annunciators will provide indications. | Performance Feedback: Emergency Condenser and ERV instrumentation will provide indication that these systems are functioning properly once placed in service. Multiple Reactor pressure indicators and annunciators will provide performance feedback regarding the success of the blowdown. | ||
N1-EOP-4 provides direction to monitor the Pressure Suppression Pressure limit and blowdown if required. Measurable Performance Indicators: | : 3. Length | ||
The crew will manually open valves to initiate Emergency Condensers. | : a. -60 minutes Page 4 of 25 NRC Scenario 4 March 2015 | ||
The crew will manually open ERVs. Performance Feedback: | |||
Emergency Condenser and ERV instrumentation will provide indication that these systems are functioning properly once placed in service. | |||
Multiple Reactor pressure indicators and annunciators will provide performance feedback regarding the success of the blowdown. | |||
: 3. Length | |||
: a. | |||
Generation SHIFT TURNOVER INFORMATION ON COMING SHIFT: . I N ID DATE: | Exelon Generation | ||
PARTI: To be performed by the oncoming Operator before assuming the shift. | : 4. Mitigation Strategy Code | ||
* Control Panel Walkdown (all panels) (SRO, ROs) PART II: To be reviewed by the oncoming Operator before assuming the shift. | : a. PC4, RPV Slowdown due to PSP | ||
: 5. Technical Specifications | |||
: a. TS 3.2.5 | |||
: b. TS 3.6.2 Tables a and g | |||
: c. TS 3.1.7.e | |||
: 6. EAL Classification | |||
: a. Alert, EAL FA 1.1 - Any loss or any potential loss of either fuel clad barrier or RCS barrier. | |||
: 7. Special Orders | |||
: a. None Page 5 of 25 NRC Scenario 4 March 2015 | |||
~ Exelon Generation B. Initial Conditions | |||
: 1. IC Number | |||
: a. IC-154 | |||
: 2. Presets I With Triggers | |||
: a. Malfunctions | |||
: 1) CT01 B, CT Pump 112 Trip Inserted | |||
: 2) HV01 B, Reactor Building Exhaust Fan Trip 12 Inserted | |||
: 3) HV01A, Reactor Building Exhaust Fan Trip 11 TRG 1 | |||
: 4) RR65E, RR Pump 15 Blind Controller Input Signal Failure, FV=95, RT=5min TRG2 | |||
: 5) RR09E, RR PUMP 15 MG Slot Temperature Increase, DT=30sec, RT=10min, TRG3 FV=60 | |||
: 6) EC01, Steam Supply Line Break in PC, FV=11 TRG5 | |||
: 7) PC10A, BV 68-01 Fails Open TRG 23 | |||
: 8) PC10C, BV 68-03 Fails Open TRG 23 | |||
: 9) FW28A, HPCI MODE: FWP 11 AUTO-START FAIL Inserted | |||
: 10) FW288, HPCI MODE: FWP 12 AUTO-START FAIL Inserted | |||
: 11) CT01A, CT Pump 111 Trip Inserted | |||
: 12) CS07, CS Injection Valves Failure to Auto Open Inserted | |||
: b. Remotes 1) | |||
: c. Overrides None | |||
: d. Annunciators None Page 6 of 25 NRC Scenario 4 March 2015 | |||
Exelon Generation | |||
: e. Event Triggers TRG 3, Initiates when RRP 15 M/A station is taken to zdrrmam(5)==1 Blank manual to initiate slot temperature rise. | |||
TRG 22, Initiates when RRP 15 M/A station is taken to zdrrmam(5)==1 dmf rr65e manual to delete M/A station oscillations TRG 23, Initiated when Mode Switch is taken to zdrpstdn==1 imf ec01 (0 0) 30 4:00 11 Shutdown to increase the size of the leak. | |||
TRG 24, Initiates when Containment Spray flow is ctfdw>100 imf ec01 (0 0) 45 1:00 30 initiated to increase size of the leak. | |||
TRG 25, Delete slot temperature rise malfunction when zdrrmgpl(5)==1 dmf rr09e the recirc pump is secured. | |||
: f. Equipment Out of Service | |||
: 1) Containment Spray Pump 112 in PTL with yellow tag | |||
: 2) Containment Spray suction isolation valve 112 closed with yellow tag | |||
: 3) Reactor Build Exhaust Fan 12 secured with yellow tag | |||
: 4) Recirc Pump 11 secured, ready for start | |||
: g. Support Documentation | |||
: 1) N1-0P-1 marked up through step H.4.4 | |||
: 2) N1-0P-43B marked up through step 2.6 | |||
: 3) RMI for lowering recirc flow to 50 Mlbm/hr | |||
: h. Miscellaneous | |||
: 1) Protect the following equipment: EDG 103, PB 103 | |||
: 2) Update Divisional Status Board | |||
: 3) Ensure LPRM downscale pushbuttons are depressed on rod block monitor | |||
: 4) DW Cooling Fan 11 Secured Page 7 of 25 NRC Scenario 4 March 2015 | |||
=~Exelon Generation SHIFT TURNOVER INFORMATION ON COMING SHIFT: . I N ID DATE: _T_o_d_ay~-- | |||
PARTI: To be performed by the oncoming Operator before assuming the shift. | |||
* Control Panel Walkdown (all panels) (SRO, ROs) | |||
PART II: To be reviewed by the oncoming Operator before assuming the shift. | |||
* LCO Status (SRO) | * LCO Status (SRO) | ||
* Shift Turnover Information Sheet Evolutions/General Information/Equipment Status: | * Shift Turnover Information Sheet Evolutions/General Information/Equipment Status: | ||
Line 1,899: | Line 2,686: | ||
* Containment Spray pump 112 is out of service for maintenance (Day 1 of planned 2 day window; 15 day LCO per TS 3.3.7.b). | * Containment Spray pump 112 is out of service for maintenance (Day 1 of planned 2 day window; 15 day LCO per TS 3.3.7.b). | ||
* Reactor Building Exhaust Fan 12 is out of service for maintenance. | * Reactor Building Exhaust Fan 12 is out of service for maintenance. | ||
* RRP 11 removed from service for repairs and is ready to be returned to service. | * RRP 11 removed from service for repairs and is ready to be returned to service. TS 3.1. 7.e. Four loop operation. | ||
TS 3.1. 7.e. Four loop operation. | PART Ill: Remarks/Planned Evolutions: | ||
PART Ill: Remarks/Planned Evolutions: | * Start RRP 11 per N1-0P-1, H.4.0, and return to five-loop operation. N1-0P-1, H.4.0, signed off up to step H.4.5. N1-0P-43B signed off up to step 2.7. | ||
* Start RRP 11 per N1-0P-1, H.4.0, and return to five-loop operation. | |||
N1-0P-1, H.4.0, signed off up to step H.4.5. N1-0P-43B signed off up to step 2.7. | |||
* Reactor power is at 90% and must be lowered until recirc flow <50 Mlbm/hr to support starting RRP 11. | * Reactor power is at 90% and must be lowered until recirc flow <50 Mlbm/hr to support starting RRP 11. | ||
* After starting Recirc Pump 11 MG set, operate it on the master flow controller for one hour while maintenance takes readings before returning to 100% power. Page 8 of 25 NRC Scenario 4 March 2015 Exelon Generation ATTACHMENT 2: REACTIVITY MANEUVER INSTRUCTION Reactivity Maneuver: | * After starting Recirc Pump 11 MG set, operate it on the master flow controller for one hour while maintenance takes readings before returning to 100% power. | ||
Recirc Pump Restoration Step: 1 I INITIAL CONDITIONS/STEP DESCRIPTION I RE presence required in the Control Room? Yes_ No | Page 8 of 25 NRC Scenario 4 March 2015 | ||
: 2. Start 11 RRP per | |||
N/A D. Other Comments: | ~ Exelon Generation ATTACHMENT 2: REACTIVITY MANEUVER INSTRUCTION Reactivity Maneuver: Recirc Pump Restoration Step: 1 I INITIAL CONDITIONS/STEP DESCRIPTION | ||
After Starting recirc pump 11 MG set and placing it on the master controller, operate it for 1 hour prior to returning to 100% power. Step Prepared by: Alex Reed I Today Step Reviewed by: Jack Dean I Today RE/STA Date RE/STA/SRO Date Approval to perform Step John Aaron I Today Step Completed by: I Shift Manager Date SRO Date Page 9 of 25 NRC Scenario 4 March 2015 | ./ | ||
I RE presence required in the Control Room? Yes_ No If YES above, RE presence not required for steps_. | |||
Initial conditions to be verified prior to initiation of step: | |||
Parameter Expected Range Actual Parameter Expected Range Actual Recirc Flow 51-54 Mlbm/hr Description of Step: | |||
: 1. Lower recirculation flow to 49-50 Mlbm/hr. | |||
: 2. Start 11 RRP per N1-0P-1 | |||
: 3. Raise reactor Power to 98% with recirc flow | |||
: 4. Raise reactor Power to 100% with recirc flow over one hour Critical parameters to be monitored DURING Step: | |||
Critical parameters not used must be deleted OR marked N/A Critical Parameter Limit Owner Frequency Contingency CTP 1850 MWth RO Continuous Lower recirculation flow or insert cram rods RMI evaluated against approved power profile:* N/A D. | |||
Other Comments: | |||
After Starting recirc pump 11 MG set and placing it on the master controller, operate it for 1 hour prior to returning to 100% power. | |||
Step Prepared by: Alex Reed I Today Step Reviewed by: Jack Dean I Today RE/STA Date RE/STA/SRO Date Approval to perform Step John Aaron I Today Step Completed by: I Shift Manager Date SRO Date Page 9 of 25 NRC Scenario 4 March 2015 | |||
=::"Exelon Generation Shift Turnover Take the Simulator out of freeze before the crew enters for the pre-shift walkdown. | =::"Exelon Generation Shift Turnover Take the Simulator out of freeze before the crew enters for the pre-shift walkdown. | ||
* Verify annunciator sound turned on | * Verify annunciator sound turned on | ||
* If recording | * If recording scenario, start the recording device during the pre-shift walkdown Allow no more than 5 minutes to walkdown the Crew panels. | ||
* Walkdown panels | * Walkdown panels | ||
* Conduct shift turnover brief | * Conduct shift turnover brief | ||
* Assume the shift March 2015 | * Assume the shift Page 10 of 25 NRC Scenario 4 March 2015 | ||
__.,. Exelon Generation Event #1: Power Reduction with Recirc Flow for RRP Restoration | __.,. Exelon Generation Event #1: Power Reduction with Recirc Flow for RRP Restoration | ||
* The crew will reduce reactor power with recirc flow in order to restore recirc pump 11 to service following repairs SRO Note: Reactivity brief and procedure review will be | * The crew will reduce reactor power with recirc flow in order to restore recirc pump 11 to service following repairs SRO Note: Reactivity brief and procedure review will be | ||
* Directs RO to lower core flow to <50 Mlbm/hr conducted prior to the crew entering the simulator. | * Directs RO to lower core flow to <50 Mlbm/hr conducted prior to the crew entering the simulator. IAWRMI | ||
IAWRMI | |||
* Supervises reactivity maneuver RO | * Supervises reactivity maneuver RO | ||
* Reduces recirc flow IAW RMI | * Reduces recirc flow IAW RMI | ||
* Continuously observes the following: | * Continuously observes the following: | ||
-APRMs lowering | - APRMs lowering | ||
-Recirc flow lowering | - Recirc flow lowering | ||
-Steam and feedwater flow lowering | - Steam and feedwater flow lowering | ||
-Vessel level normal | - Vessel level normal | ||
* Lower recirc flow until <50 Mlbm/hr | * Lower recirc flow until <50 Mlbm/hr | ||
* Report when recirc flow is <50 Mlbm/hr BOP | * Report when recirc flow is <50 Mlbm/hr BOP | ||
* Monitors individual RRP for response | * Monitors individual RRP for response | ||
-Individual MIA-Speed Control stations trending uniformly | - Individual MIA-Speed Control stations trending uniformly | ||
-Individual RRP indications trending normally for lowering speed | - Individual RRP indications trending normally for lowering speed | ||
* Monitors feed water controls for proper response | * Monitors feed water controls for proper response | ||
-FWP 13 FCV responding to power change | - FWP 13 FCV responding to power change | ||
* RPV Water Level remains within program band (65" -83") Page 11 of 25 NRC Scenario 4 March 2015 | * RPV Water Level remains within program band (65" - 83") | ||
Page 11 of 25 NRC Scenario 4 March 2015 | |||
Generation | =~Exelon Generation | ||
* The plant is operating in 4 loop operation | * The plant is operating in 4 loop operation | ||
* The crew will restore RRP 11 to service Note: Crew directed to start RRP 11 in pre-brief, SRO starting at N1-0P-1, step H.4.5. | * The crew will restore RRP 11 to service Note: Crew directed to start RRP 11 in pre-brief, SRO starting at N1-0P-1, step H.4.5. | ||
* Direct start up of RRP 11, using N 1-0P-1, starting at step H.4.5 | * Direct start up of RRP 11, using N 1-0P-1, starting at step H.4.5 | ||
* Supervise reactivity manipulation | * Supervise reactivity manipulation | ||
* Acknowledge report that RRP 11 is in service | * Acknowledge report that RRP 11 is in service | ||
* Determine TS 3.1. 7.e no longer applies and the LCO Actions can be exited RO | * Determine TS 3.1. 7.e no longer applies and the LCO Actions can be exited RO | ||
* Continuously observe the following: | * Continuously observe the following: | ||
-APR Ms -Recirc flow | - APR Ms | ||
* Monitor P/F map and transfer from 4 loop to 5 loop map when the startup is performed Page 12 of 25 NRC Scenario 4 March 2015 Exelon Generation Event 2 Continued | - Recirc flow | ||
* Monitor P/F map and transfer from 4 loop to 5 loop map when the startup is performed Page 12 of 25 NRC Scenario 4 March 2015 | |||
Exelon Generation Event 2 Continued BOP | |||
* Verify recirculation flow < 50 x 106 lb/hr | * Verify recirculation flow < 50 x 106 lb/hr | ||
* Verify RRP 11 GEMAC in MAN and matched with other four GEMACs but no greater than 50% | * Verify RRP 11 GEMAC in MAN and matched with other four GEMACs but no greater than 50% | ||
* Verify RRP 11 discharge valve closed | * Verify RRP 11 discharge valve closed | ||
* Verify RRP 11 suction and discharge bypass valves are open | * Verify RRP 11 suction and discharge bypass valves are open CAUTIONS from N1-0P-1 | ||
* Make a plant announcement for start of RRP 11 | * Make a plant announcement for start of RRP 11 | ||
* Place RRP 11 control switch to START and observe indications | * Failure to raise Recirc Pump speed during | ||
* Place RRP 11 control switch to START and opening of discharge valve may result in stalled observe indications rotor and pump trip due to reverse flow. | |||
* MG MOTOR starts, Amp Meter Amps increase then decrease | * MG MOTOR starts, Amp Meter Amps increase then decrease | ||
* MG Generator accelerates to proper speed (approx 50 -60 Hz) | * To Prevent backflow thru the RRP, discharge valve should be opened before MG frequency | ||
* Generator Field Bkr closes | * MG Generator accelerates to proper speed lowers to 20 Hz. Frequency will raise, then drop (approx 50 - 60 Hz) quickly, then raise again before SLOWLY | ||
* Generator slows toward 20% speed (Approximately 11.5 Hz) | * Generator Field Bkr closes lowering. Discharge BV should be opened when | ||
* Generator slows toward 20% speed frequency is slowly lowering. | |||
(Approximately 11.5 Hz) | |||
* WHEN speed (Frequency Meter) is between 30 and 25 Hz, open REACTOR R PUMP DISCH VALVE | * WHEN speed (Frequency Meter) is between 30 and 25 Hz, open REACTOR R PUMP DISCH VALVE | ||
* Verify RRP 11 maintained less than or equal to OP limits | * Verify RRP 11 maintained less than or equal to OP limits | ||
* Adjust pump speed to match other pumps | * Adjust pump speed to match other pumps Role Play: As PO sent to Aux Control Room, wait | ||
* Null RRP 11 controller and shift to BAL or AUTO | * Null RRP 11 controller and shift to BAL or AUTO one minute then report you have reset 50SR Pump Motor Stalled Rotor Target | ||
* Verify power/flow map updated to five loop requirements | * Verify power/flow map updated to five loop requirements | ||
* Dispatch PO to reset 50SR Pump Motor Stalled Rotor Target (Aux Control Room) | * Dispatch PO to reset 50SR Pump Motor Stalled Role Play: As PO, when requested report MG set oil Rotor Target (Aux Control Room) temperature is 120°F and stable. | ||
* Dispatch PO to check MG set oil temperature locally | * Dispatch PO to check MG set oil temperature locally | ||
* May perform N 1-ARP-F2-1-1 action to depress PUMP MOTOR VIBRATION RESET pushbutton on F Panel, clearing annunciator F2-1-1 March 2015 Exelon Generation Event #3: Loss of Normal Reactor Building Ventilation | * May perform N 1-ARP-F2-1-1 action to depress PUMP MOTOR VIBRATION RESET pushbutton on F Panel, clearing annunciator F2-1-1 Page 13 of 25 NRC Scenario 4 March 2015 | ||
Exelon Generation Event #3: Loss of Normal Reactor Building Ventilation | |||
* A trip of RB Exhaust Fan 11 occurs with RB Exhaust Fan 12 OOS for maintenance. | * A trip of RB Exhaust Fan 11 occurs with RB Exhaust Fan 12 OOS for maintenance. | ||
* The crew will need to re-establish negative RB DIP with RBEVS As directed by lead examiner, insert malfunction: | * The crew will need to re-establish negative RB DIP with RBEVS As directed by lead examiner, insert malfunction: CREW | ||
CREW | * Recognize/report L 1-3-4, REACT BLDG/ATM HV01A, Reactor Building Exhaust Fan Trip 11 DIFF PRESS, in alarm. | ||
* Recognize/report L 1-3-4, REACT BLDG/ATM HV01A, Reactor Building Exhaust Fan Trip 11 DIFF PRESS, in alarm. TRG 1 | TRG 1 | ||
* Recognize/report L 1-1-5, RB VENT EXH FAN 11-12 TRIP -VIB, in alarm. | * Recognize/report L 1-1-5, RB VENT EXH FAN 11- 12 TRIP - VIB, in alarm. | ||
* Recognize/report exhaust fan 11 tripped . L1-1-5, RB VENT EXH FAN 11-12 TRIP-V/B SRO L 1-2-4, RB VENT SUP SYSTEM | * Recognize/report exhaust fan 11 tripped . | ||
* L 1-3-4, REACT BLDG/ATM DIFF PRESS DIFF PRESS, in alarm. RB dP drops to O" | L1-1-5, RB VENT EXH FAN 11-12 TRIP-V/B SRO L 1-2-4, RB VENT SUP SYSTEM L 1-2-5, RB VENT EXH FLOW LOW | ||
* Acknowledge report | * Acknowledge report L1-3-4, REACT BLDG/ATM L 1-3-4, REACT BLDG/ATM DIFF PRESS DIFF PRESS, in alarm. | ||
RB dP drops to O" | |||
* Acknowledge report L1-1-5, RB VENT EXH FAN 11- 12 TRIP - VIB, in alarm. | |||
* Acknowledge report exhaust fan 11 tripped . | * Acknowledge report exhaust fan 11 tripped . | ||
* Direct actions of | * Direct actions of L1-3-4andL1-1-5 to be performed. | ||
* Acknowledge reactor building negative pressure is degraded low. | * Acknowledge reactor building negative pressure is degraded low. | ||
* Recognize entry condition for N1-EOP-5, Secondary Containment Control. | * Recognize entry condition for N1-EOP-5, Secondary Containment Control. | ||
* Determine no emergency exists (activation of emergency plan not required). | * Determine no emergency exists (activation of emergency plan not required). | ||
: i. Per SC-3, ensure RBEVS started and RB ventilation isolated | : i. Per SC-3, ensure RBEVS started and RB ventilation isolated | ||
* Determine that with the reactor building isolated and RBEVS running and maintaining reactor building negative pressure within the limit, entry into Tech Spec actions for Secondary Containment IS NOT REQUIRED. | * Determine that with the reactor building isolated and RBEVS running and maintaining reactor building negative pressure within the limit, entry into Tech Spec actions for Secondary Containment IS NOT REQUIRED. | ||
0 TS 3.4.2 and TS 3.4.4 requirements are met Page 14 of 25 NRC Scenario 4 March 2015 Exelon Generation Event 3 Continued | 0 TS 3.4.2 and TS 3.4.4 requirements are met Page 14 of 25 NRC Scenario 4 March 2015 | ||
* Acknowledge direction to perform actions of | |||
Exelon Generation Event 3 Continued BOP | |||
* Acknowledge direction to perform actions of L1-3-4, L1-1-5 | |||
* Monitor Reactor Building DIP | * Monitor Reactor Building DIP | ||
* Inform SRO D/P is zero | * Inform SRO D/P is zero | ||
Line 1,998: | Line 2,803: | ||
* Start 202-33, EVS FAN 12 | * Start 202-33, EVS FAN 12 | ||
* Verify open 202-35, EM VENT EXHAUST FAN 12 OUTLET BV | * Verify open 202-35, EM VENT EXHAUST FAN 12 OUTLET BV | ||
* Confirm proper operation of 202-51, EM VENT EXHAUST FAN 12 INLET FCV, by observing flow and Rx Bldg DP March 2015 | * Confirm proper operation of 202-51, EM VENT EXHAUST FAN 12 INLET FCV, by observing flow and Rx Bldg DP Page 15 of 25 NRC Scenario 4 March 2015 | ||
Generation Event 3 Continued | =~Exelon Generation Event 3 Continued BOP Continued | ||
* Isolate reactor building ventilation per N1-0P-10 o Place REACTOR BLDG SUPPLY FANS 11and12 in OFF o Place REACTOR BLDG EXHAUST FANS 11 and 12 in OFF o Place control switch for 202-31, REACTOR BLDG EXHAUST ISOLATION VALVE 12 and 202-32, REACTOR BLDG EXHAUST ISOLATION VALVE 11 in CLOSE o Place control switch for 202-15, REACTOR BLDG SUPPLY ISOLATION VALVE 11 and 202-16, REACTOR BLDG SUPPLY ISOLATION VALVE 12 in CLOSE | * Isolate reactor building ventilation per N1-0P-10 o Place REACTOR BLDG SUPPLY FANS 11and12 in OFF o Place REACTOR BLDG EXHAUST FANS 11 and 12 in OFF o Place control switch for 202-31, REACTOR BLDG EXHAUST ISOLATION VALVE 12 and 202-32, REACTOR BLDG EXHAUST ISOLATION VALVE 11 in CLOSE o Place control switch for 202-15, REACTOR BLDG SUPPLY ISOLATION VALVE 11 and 202-16, REACTOR BLDG SUPPLY ISOLATION VALVE 12 in CLOSE | ||
* Report RBEVS in service and reactor building ventilation isolated March 2015 Exelon Generation Event #4: Recirc Pump 15 M/A Failure and High Temperature Trip | * Report RBEVS in service and reactor building ventilation isolated Page 16 of 25 NRC Scenario 4 March 2015 | ||
Exelon Generation Event #4: Recirc Pump 15 M/A Failure and High Temperature Trip | |||
* The plant is operating with 5 recirc loops in service at less than rated power. | * The plant is operating with 5 recirc loops in service at less than rated power. | ||
* RRP15 flow rises due to a blind controller | * RRP15 flow rises due to a blind controller failure, but stops when placed in Manual | ||
* RRP15 runs a high slot temperature and must be tripped As directed by lead examiner, insert malfunction: CREW RR65E, RR Pump 15 Blind Controller Input Signal | |||
* RRP15 runs a high slot temperature and must be tripped As directed by lead examiner, insert malfunction: | * Diagnose/report Recirc pump 15 parameters are Failure, FV=95, RT=5min elevated. | ||
CREW RR65E, RR Pump 15 Blind Controller Input Signal | |||
* Diagnose/report Recirc pump 15 parameters are Failure, FV=95, RT=5min elevated. | |||
TRG2 APRMs, MWth, MWe, all rise SRO | TRG2 APRMs, MWth, MWe, all rise SRO | ||
* Acknowledges report of power rising | * Acknowledges report of power rising | ||
Line 2,020: | Line 2,825: | ||
* Places RR Pump 15 MIA station in MAN | * Places RR Pump 15 MIA station in MAN | ||
* Verifies failure stops | * Verifies failure stops | ||
* Notifies SRO/Crew that RR Pump 15 is in manual and that the malfunction has stopped Page 17 of 25 NRC Scenario 4 March 2015 | * Notifies SRO/Crew that RR Pump 15 is in manual and that the malfunction has stopped Page 17 of 25 NRC Scenario 4 March 2015 | ||
Generation Verify the following malfunction is automatically CREW inserted when the RRP 15 MIA station is taken to | =~Exelon Generation Verify the following malfunction is automatically CREW inserted when the RRP 15 MIA station is taken to | ||
* Acknowledge/report Annunciator F2-2-5 MAN: | * Acknowledge/report Annunciator F2-2-5 MAN: | ||
* Observe computer points A 130 and 8399 in alarm RR09E, RR Pump 15 MG Slot Temperature | * Observe computer points A 130 and 8399 in alarm RR09E, RR Pump 15 MG Slot Temperature Increase, DT=30sec, RT=10:00, FV=60 TRG3 Expected Annunciator: | ||
F2-2-5, REACT REC/RC MG SET 15 -6 min Expected Computer Points: | |||
F2-2-5, REACT REC/RC MG SET 15 -6 min Expected Computer Points: 8399 RRMG 15 GEN SLOT TEMP C -5min A130 RRMG 15 GEN SLOT TEMP HIGH-6 min 8404 RRP 15 MTR Slot Temp High SRO Note: If the crew does not take action to secure the | 8399 RRMG 15 GEN SLOT TEMP C - 5min A130 RRMG 15 GEN SLOT TEMP HIGH-6 min 8404 RRP 15 MTR Slot Temp High SRO Note: If the crew does not take action to secure the | ||
* Acknowledges RRMG 15 high slot temperature pump after a reasonable time trip RR Pump 15 by | * Acknowledges RRMG 15 high slot temperature pump after a reasonable time trip RR Pump 15 by | ||
* Directs execution of ARP F2-2-5 inserting malfunction RR01 E. | * Directs execution of ARP F2-2-5 inserting malfunction RR01 E. | ||
* Directs a reactor power reduction | * Directs a reactor power reduction | ||
* Provides oversight of reactivity manipulation Note: N1-0P-1 directs lowering power per N1-0P-* May direct a trip of RR Pump 15 and entry into 438. However, due to the emergent nature of this N1-SOP-1.3 event, the crew will likely lower power using the guidance of N 1-SOP-1.1, Emergency Power | * Provides oversight of reactivity manipulation Note: N1-0P-1 directs lowering power per N1-0P- | ||
* May direct a trip of RR Pump 15 and entry into 438. However, due to the emergent nature of this N1-SOP-1.3 event, the crew will likely lower power using the guidance of N 1-SOP-1.1, Emergency Power | |||
* May direct entry into N1-SOP-1.5 after the trip Reduction. | * May direct entry into N1-SOP-1.5 after the trip Reduction. | ||
* May direct removing RR Pump 15 from service using N1-0P-1, Sect H.1.0 Role Play: If contacted as the Ops Director regarding | * May direct removing RR Pump 15 from service using N1-0P-1, Sect H.1.0 Role Play: If contacted as the Ops Director regarding | ||
* Enter T.S. 3.6.2 for inoperable APRMs while RR the high temperature, direct the crew to remove the Pump 15 Discharge Valve is open if the pump is MG Set from service. | * Enter T.S. 3.6.2 for inoperable APRMs while RR the high temperature, direct the crew to remove the Pump 15 Discharge Valve is open if the pump is MG Set from service. tripped | ||
tripped | |||
* Enters T.S. 3.1.7.e for partial loop operation RO | * Enters T.S. 3.1.7.e for partial loop operation RO | ||
* Monitors plant parameters | * Monitors plant parameters | ||
Line 2,040: | Line 2,845: | ||
* Verifies P/F Map updated for 4 loop operation | * Verifies P/F Map updated for 4 loop operation | ||
* Lowers Recirc flow as necessary to remain within flow limits for 4 loop operation | * Lowers Recirc flow as necessary to remain within flow limits for 4 loop operation | ||
* Monitors plant limits for 4 loop operation Page 18 of 25 NRC Scenario 4 March 2015 | * Monitors plant limits for 4 loop operation Page 18 of 25 NRC Scenario 4 March 2015 | ||
=:r-Exelon Generation | |||
=:r-Exelon Generation BOP | |||
* Enters ARP F2-2-5 Role Play: If requested to check Turbine Building | |||
* Enters N1-0P-1, Sect F.4 Ventilation and MG Set Ventilation, wait 3 minutes, | |||
* Enters ARP F2-2-5 | * Dispatches operator to verify proper operation of MG Set Area Ventilation, TB Track Bay AND Roll then report that everything is normal with the door position(s), and MG Set Area Coolers. | ||
* Enters N1-0P-1, Sect F.4 | ventilation. Report that the generator end of RRMG | ||
* Dispatches operator to verify proper operation of MG Set Area Ventilation, TB Track Bay AND Roll door position(s), | * Verifies Reactor Recirc Pump parameters are 15 is very hot to the touch. within the following limits: | ||
and MG Set Area Coolers. | |||
* Verifies Reactor Recirc Pump parameters are within the following limits: | |||
* Generator MW 0.790 MW | * Generator MW 0.790 MW | ||
* Generator Amps 240 A | * Generator Amps 240 A | ||
Line 2,055: | Line 2,858: | ||
* Generator Frequency 11.5 Hz to 56 Hz | * Generator Frequency 11.5 Hz to 56 Hz | ||
* Verifies total recirculation flow is evenly balanced between all operating RRPs | * Verifies total recirculation flow is evenly balanced between all operating RRPs | ||
* When Generator slot temperature continues to rise and approaches or exceeds 120°C, reduces loading on affected RRMG by lowering power per N1-0P-43B If directed to trip RR Pump 15: | * When Generator slot temperature continues to rise and approaches or exceeds 120°C, reduces Note: N1-0P-1 directs lowering power per N1-0P- loading on affected RRMG by lowering power per N1-0P-43B 43B. However, due to the emergent nature of this If directed to trip RR Pump 15: | ||
* Places RR Pump MOTOR 15 MG SET switch to STOP | event, the crew will likely lower power using the | ||
* Places RR Pump MOTOR 15 MG SET guidance of N 1-SOP-1.1, Emergency Power switch to STOP Reduction. | |||
* Enters N1-SOP-1.3 | * Enters N1-SOP-1.3 | ||
* Notifies SRO the APRMs are inop | * Notifies SRO the APRMs are inop | ||
* Close RR Pump 15 Discharge Valve | * Close RR Pump 15 Discharge Valve Note: Verify TRG 25 inserts to automatically | ||
* Holds Discharge Valve in OPEN position for 2 to 3 seconds | * Holds Discharge Valve in OPEN position for delete RR09E when the recirc pump is tripped. 2 to 3 seconds | ||
* Records time | * Records time | ||
* Notifies SRO the APRMs are operable If directed, removes RR Pump 15 from service using N1-0P-1, Sect H.1 | * Notifies SRO the APRMs are operable If directed, removes RR Pump 15 from service using N1-0P-1, Sect H.1 | ||
* Verifies open RR Pump 15 Bypass Valve | * Verifies open RR Pump 15 Bypass Valve 6 | ||
* Lowers flow on RR Pump 15 to 6 to 8 x | * Lowers flow on RR Pump 15 to 6 to 8 x 10 lbm/hr | ||
* Closes RR Pump 15 Discharge Valve | * Closes RR Pump 15 Discharge Valve | ||
* When the Discharge Valve is closed, places RR Pump MOTOR 15 MG SET switch to STOP | * When the Discharge Valve is closed, places RR Pump MOTOR 15 MG SET switch to STOP | ||
* Holds Discharge Valve in OPEN position for 2 to 3 seconds March 2015 Exelon Generation Events #5, #6, #7, and #8: Steam Leak Inside Drywell, Vacuum Breaker Fails Open, Failure of HPCI and Core Spray to Initiate, Trip of Containment Spray Pump 111 | * Holds Discharge Valve in OPEN position for 2 to 3 seconds Page 19 of 25 NRC Scenario 4 March 2015 | ||
* EC Steam line Break in the Drywell with multiple system failures When directed by the lead examiner, insert malfunction: | |||
EC01, Steam Supply Line Break in PC, FV=11 TRG5 Drywel/ humidity, pressure and temperature rise Drywel/ /eakage rises Expected annunciators: | Exelon Generation Events #5, #6, #7, and #8: Steam Leak Inside Drywell, Vacuum Breaker Fails Open, Failure of HPCI and Core Spray to Initiate, Trip of Containment Spray Pump 111 | ||
H2-1-1, Drywell Floor Drain Level High H2-4-7, Drywel/ Water Leak Detection Sys K2-4-3, Drywell Pressure High-Low F1-1-5(4-1-4), | * EC Steam line Break in the Drywell with multiple system failures When directed by the lead examiner, insert CREW malfunction: | ||
RPS Ch 11(12) Drywel/ Press High Verify the following malfunctions are preset: FW28A, HPCI Mode Failure to Initiate 11 FW28B, HPCI Mode Failure to Initiate 12 CT01A, CT Pump 111 Trip CS07, CS Injection Valves Failure to Auto Open RPV water level slowly lowering Containment Spray pump 111 red light off, green light on and amps go to zero Core Spray /Vs do NOT open at 365 psig Expected annunciator: | * Diagnose/report degrading containment EC01, Steam Supply Line Break in PC, FV=11 parameters TRG5 | ||
K1-1-7, Containment Spray Pump 111 Trip Failto Run Page 20 of 25 NRC Scenario 4 | * Acknowledge/report annunciators Drywel/ humidity, pressure and temperature rise | ||
* Diagnose failure of HPCI to automatically initiate Drywel/ /eakage rises Expected annunciators: | |||
* Diagnose the trip of Containment Spray pump H2-1-1, Drywell Floor Drain Level High 111 H2-4-7, Drywel/ Water Leak Detection Sys K2-4-3, Drywell Pressure High-Low F1-1-5(4-1-4), RPS Ch 11(12) Drywel/ Press High Verify the following malfunctions are preset: | |||
FW28A, HPCI Mode Failure to Initiate 11 FW28B, HPCI Mode Failure to Initiate 12 CT01A, CT Pump 111 Trip CS07, CS Injection Valves Failure to Auto Open RPV water level slowly lowering Containment Spray pump 111 red light off, green light on and amps go to zero Core Spray /Vs do NOT open at 365 psig Expected annunciator: | |||
K1-1-7, Containment Spray Pump 111 Trip Failto Run Page 20 of 25 NRC Scenario 4 March 2015 | |||
Exelon Generation Events 5, 6, 7, and 8 continued SRO | |||
* Acknowledges reports | * Acknowledges reports | ||
* Directs manual scram | * Directs manual scram Verify the following malfunctions automatically insert when the mode switch is taken to | ||
* Acknowledges scram report | * Acknowledges scram report SHUTDOWN: | ||
* Enters N 1-EOP-2 on low RPV water level | * Enters N 1-EOP-2 on low RPV water level | ||
* Directs N1-SOP-1 actions | * Directs N1-SOP-1 actions EC01, Steam Supply Line Break in PC, IV=11, RT=4:00, FV=30 | ||
* Directs RPV water level controlled 53-95" with Condensate/FW and CRD | * Directs RPV water level controlled 53-95" with PC10A, BV 68-01 Fails Open Condensate/FW and CRD PC10C, BV 68-03 Fails Open | ||
* When notified of the failure of HPCI to initiate, directs manual control of Feedwater (preferred and alternate injection systems) | * When notified of the failure of HPCI to initiate, TRG23 Containment conditions further degrade directs manual control of Feedwater Two Torus-to-Drywel/ vacuum breakers indicate open (preferred and alternate injection systems) | ||
CT-1 | Expected annunciator: | ||
K1-4-6, Torus-OW Vac Relief Check Valve Open CT-1 | |||
* Directs RPV pressure controlled 800-1000 psig with Turbine Bypass Valves (if available) or Emergency Condensers | * Directs RPV pressure controlled 800-1000 psig with Turbine Bypass Valves (if available) or Emergency Condensers | ||
* May direct closure of MSIVs to limit cooldown rate | * May direct closure of MSIVs to limit cooldown rate | ||
* Enters N1-EOP-4 due to high drywell pressure and temperature o Direct lockout of Containment Spray pumps | * Enters N1-EOP-4 due to high drywell pressure and temperature Verify the following malfunction automatically inserts when Containment Spray flow is initiated to o Direct lockout of Containment Spray pumps the Drywell: | ||
* Re-enters N1-EOP-2 due to high drywell pressure and low RPV water level March 2015 Exelon Generation Events 5, 6, 7, and 8 continued | * Re-enters N1-EOP-2 due to high drywell pressure and low RPV water level EC01, Steam Supply Line Break in PC, IV=30, RT=1 :00, FV=45 TRG24 Page 21 of 25 NRC Scenario 4 March 2015 | ||
Exelon Generation Events 5, 6, 7, and 8 continued SRO continued | |||
* When torus pressure exceeds 13 psig or drywell temperature approaches 300°F: | * When torus pressure exceeds 13 psig or drywell temperature approaches 300°F: | ||
* Answers "Below the Containment Spray Initiation Limit?" -Yes | * Answers "Below the Containment Spray Initiation Limit?" - Yes | ||
* Verifies all Recirc pumps tripped | * Verifies all Recirc pumps tripped | ||
* Directs trip of all Drywell cooling fans | * Directs trip of all Drywell cooling fans | ||
* Directs operation of Containment Spray per EOP-1 attachment 17 | * Directs operation of Containment Spray per EOP-1 attachment 17 | ||
* Evaluates/monitors position on Pressure Suppression Pressure curve | * Evaluates/monitors position on Pressure Suppression Pressure curve Role Play: If directed to perform in-plant actions to | ||
* Acknowledges report of Containment Spray pump 111 trip | * Acknowledges report of Containment Spray line up Containment Spray Raw Water to pump 111 trip Containment Spray, acknowledge order, but delay | ||
* May direct rapid depressurization with ECs in anticipation of RPV Slowdown | * May direct rapid depressurization with ECs in any field actions. | ||
anticipation of RPV Slowdown | |||
* Determines Torus pressure cannot be maintained within Pressure Suppression Pressure limit Enters N1-EOP-8, RPV Slowdown CT-2 | * Determines Torus pressure cannot be maintained within Pressure Suppression Pressure limit | ||
* Enters N1-EOP-8, RPV Slowdown CT-2 | |||
* Answers "Are all control rods inserted to at least 04?" YES | * Answers "Are all control rods inserted to at least 04?" YES | ||
* Answers "Drywell pressure?" | * Answers "Drywell pressure?" At or above 3.5 psig Note: Core Spray injection will only be prevented if | ||
At or above 3.5 psig | * May direct prevention of Core Spray injection not needed for core cooling. If the crew has not yet per EOP-1 attachment 4 re-established RPV injection when this step is | ||
* May direct prevention of Core Spray injection per EOP-1 attachment 4 | * Directs EC initiation evaluated, the Core Spray jumpers may not be | ||
* Directs EC initiation | * Answers "Torus water level?" Above 8.0 ft installed until later. N1-EOP-2 step P-1 provides | ||
* Answers "Torus water level?" Above 8.0 ft | * Directs open 4 ERVs continuous guidance for this consideration. | ||
* Directs open 4 ERVs March 2015 | Page 22 of 25 NRC Scenario 4 March 2015 | ||
Generation Events 5, 6, 7, and 8 continued RO | =~Exelon Generation Events 5, 6, 7, and 8 continued RO | ||
* Monitors plant parameters | * Monitors plant parameters | ||
* When directed, places Mode Switch in Shutdown | * When directed, places Mode Switch in Shutdown | ||
Line 2,123: | Line 2,926: | ||
* Down-ranges IRMs as necessary to monitor power decrease | * Down-ranges IRMs as necessary to monitor power decrease | ||
* If recirc pumps have not yet tripped, reduces recirc flow to 25-43 Mlbm/hr | * If recirc pumps have not yet tripped, reduces recirc flow to 25-43 Mlbm/hr | ||
* Maintains RPV pressure below 1080 psig and in assigned band March 2015 | * Maintains RPV pressure below 1080 psig and in assigned band Page 23 of 25 NRC Scenario 4 March 2015 | ||
Generation Events 5, 6, 7, and 8 continued BOP | =~Exelon Generation Events 5, 6, 7, and 8 continued BOP | ||
* Monitors/reports degrading Containment parameters | * Monitors/reports degrading Containment parameters | ||
* Performs RPV water level control actions of SOP-1, Reactor Scram: Note: Feedwater level control actions will vary | * Performs RPV water level control actions of SOP-1, Reactor Scram: | ||
* Restores RPV level to 53-95" by controlling depending on when the operator diagnoses the failure of HPCI to automatically control injection through Feedwater flow control valves 11 and 12. | Note: Feedwater level control actions will vary | ||
* Restores RPV level to 53-95" by controlling depending on when the operator diagnoses the injection and rejecting through RWCU failure of HPCI to automatically control injection | |||
* Starts 11 or 12 MDFWP through Feedwater flow control valves 11 and 12. | |||
* Determines RPV water level is recovering | * Determines RPV water level is recovering | ||
* Terminates 13 FWP injection as follows: | * Terminates 13 FWP injection as follows: | ||
Line 2,143: | Line 2,947: | ||
* Diagnoses failure of HPCI to automatically initiate | * Diagnoses failure of HPCI to automatically initiate | ||
* Notifies SRO/Crew of HPCI failure | * Notifies SRO/Crew of HPCI failure | ||
* Manually controls RPV injection to restore and maintain level CT-1 March 2015 Events 7, 8, and 9 continued | * Manually controls RPV injection to restore and maintain level CT-1 Page 24 of 25 NRC Scenario 4 March 2015 | ||
Events 7, 8, and 9 continued RO/BOP | |||
* Places Containment Spray pumps in PTL Closes MSIVs, as directed Reports when Torus pressure exceeds 13 psig or Drywell temperature approaches 300°F Verifies Recirc pumps tripped Trips Drywell cooling fans Initiates Containment Spray per N1-EOP-1 attachment 17 | * Places Containment Spray pumps in PTL | ||
* Diagnoses/reports Containment Spray pump 111 trip Verifies started Containment Spray pumps 121 and 122 If 80-118 is open for Torus Cooling: | * Closes MSIVs, as directed | ||
* Opens 80-35 | * Reports when Torus pressure exceeds 13 psig or Drywell temperature approaches 300°F | ||
* Closes 80-118 | * Verifies Recirc pumps tripped | ||
* Verifies open 80-40 and 80-45 Prevents Core Spray injection installing EOP-1 attachment 4 jumpers (17, 18, 19, 24, 25, 26), if directed | * Trips Drywell cooling fans | ||
* Initiates Containment Spray per N1-EOP-1 attachment 17 | |||
* Diagnoses/reports Containment Spray pump Note: Core Spray pumps may be placed in PTL if 111 trip needed before N1-EOP-1 attachment 4 jumpers can | |||
* Verifies started Containment Spray pumps be installed due to scenario progression and 121 and 122 resource limitations. If Core Spray pumps are placed | |||
* If 80-118 is open for Torus Cooling: | |||
in PTL, at least one Core Spray pump should be | |||
* Opens 80-35 restarted after jumper installation for App J water | |||
* Closes 80-118 seal. Core Spray may also be used as an alternate | |||
* Verifies open 80-40 and 80-45 injection source. | |||
* Prevents Core Spray injection installing EOP-1 attachment 4 jumpers (17, 18, 19, 24, 25, 26), if directed | |||
* Initiates both ECs | * Initiates both ECs | ||
* Opens 4 ERVs CT-2 | * Opens 4 ERVs CT-2 | ||
* Primary Containment pressure controlled per N1-EOP-1 attachment 17 Page 25 of 25 NRC Scenario 4 March 2015 | * RPV Slowdown in progress | ||
* Primary Containment pressure controlled per N1-EOP-1 attachment 17 Page 25 of 25 NRC Scenario 4 March 2015 | |||
Generation References | _.,,., Exelon Generation Copy of __ | ||
: 1. N1-0P-33A, 115 KV System 2. N 1-SOP-1.4, Stuck Open ERV 3. N 1-SOP-1.1, Emergency Power Reduction | Training Id: NRC 2015 Scenario 5 Revision: 0.0 ERV Inadvertently Opens, Powerboard 16A Fault, Loss of All RBCLC, Loss of High Pressure Feedwater, Coolant Leak Inside Primary Containment, | ||
: 4. N1-SOP-11.1, RBCLC Failure 5. N1-SOP-1, Reactor Scram 6. N1-EOP-2, RPV Control 7. N1-EOP-4, Primary Containment Control 8. N1-EOP-1, NMP1 EOP Support Procedure | |||
: 9. N1-EOP-7, RPV Flooding | ==Title:== | ||
: 10. Unit 1 Technical Specifications Page 2 of 25 NRC Scenario 5 | RPV Flooding Signature I Printed Name Developed By E~*Paul Isham 6/2/14 Validated By Pat O'Brien 8/20/14 Leigh Mason 8/20/14 Dave Ballard 8/20/14 Facility Reviewer Greg Elkins Page 1 of 25 NRC Scenario 5 | ||
=:rExelon Generation Instructor Information A. Scenario Description Sequence of Events I Expected Crew Response: | |||
The scenario begins at approximately 100% power. Containment Spray pump 112 and Reactor Building Exhaust Fan 12 are out of service for maintenance. | =~Exelon Generation References | ||
The crew will remove Line 4 from service for maintenance. | : 1. N1-0P-33A, 115 KV System | ||
The CRS will determine the Tech Spec impact. Next, ERV 111 will inadvertently open. The crew will enter N1-SOP-1.4, Stuck Open ERV. The crew will perform an emergency power reduction to approximately 85% power, then take actions to close ERV 111 (Critical Task). These actions will close the ERV, but leave it inoperable. | : 2. N 1-SOP-1.4, Stuck Open ERV | ||
The CRS will determine the Tech Spec impact. Next, Powerboard 16A will develop an electrical fault. This will cause a loss of power to three Drywell cooling fans. The crew will start an additional Drywell cooling fan to stabilize Drywell temperature and pressure. | : 3. N 1-SOP-1.1, Emergency Power Reduction | ||
The electrical loss will also affect EDG 103 auxiliary equipment. | : 4. N1-SOP-11.1, RBCLC Failure | ||
The CRS will determine the Tech Spec impact. Next, the running RBCLC pumps will trip. The standby RBCLC pump will trip upon being started. | : 5. N1-SOP-1, Reactor Scram | ||
The crew will enter N1-SOP-11.1, RBCLC Failure. | : 6. N1-EOP-2, RPV Control | ||
The crew will scram the Reactor, trip Recirculation pumps, initiate Emergency Condensers, and shut the MSIVs. The high pressure Feedwater pumps will fail to operate on the scram, complicating Reactor water level control. | : 7. N1-EOP-4, Primary Containment Control | ||
: 8. N1-EOP-1, NMP1 EOP Support Procedure | |||
: 9. N1-EOP-7, RPV Flooding | |||
: 10. Unit 1 Technical Specifications Page 2 of 25 NRC Scenario 5 | |||
=:rExelon Generation Instructor Information A. Scenario Description Sequence of Events I Expected Crew Response: | |||
The scenario begins at approximately 100% power. Containment Spray pump 112 and Reactor Building Exhaust Fan 12 are out of service for maintenance. The crew will remove Line 4 from service for maintenance. | |||
The CRS will determine the Tech Spec impact. | |||
Next, ERV 111 will inadvertently open. The crew will enter N1-SOP-1.4, Stuck Open ERV. The crew will perform an emergency power reduction to approximately 85% power, then take actions to close ERV 111 (Critical Task). These actions will close the ERV, but leave it inoperable. The CRS will determine the Tech Spec impact. | |||
Next, Powerboard 16A will develop an electrical fault. This will cause a loss of power to three Drywell cooling fans. The crew will start an additional Drywell cooling fan to stabilize Drywell temperature and pressure. The electrical loss will also affect EDG 103 auxiliary equipment. The CRS will determine the Tech Spec impact. | |||
Next, the running RBCLC pumps will trip. The standby RBCLC pump will trip upon being started. The crew will enter N1-SOP-11.1, RBCLC Failure. The crew will scram the Reactor, trip Recirculation pumps, initiate Emergency Condensers, and shut the MSIVs. The high pressure Feedwater pumps will fail to operate on the scram, complicating Reactor water level control. | |||
Once the crew stabilizes the plant after the scram, a coolant leak will develop inside the Primary Containment. | Once the crew stabilizes the plant after the scram, a coolant leak will develop inside the Primary Containment. | ||
The crew will re-enter N1-EOP-2, RPV Control, and N1-EOP-4, Primary Containment Control. | The crew will re-enter N1-EOP-2, RPV Control, and N1-EOP-4, Primary Containment Control. Containment parameters will degrade and the crew will initiate Containment Sprays (Critical Task). The elevated Containment temperature will cause the Fuel Zone level indications to become erratic. With all other Reactor water level indicators downscale, the crew will execute N1-EOP-7, RPV Flooding, to lower Reactor pressure and flood the Reactor to the Main Steam lines (Critical Task). | ||
Containment parameters will degrade and the crew will initiate Containment Sprays (Critical Task). The elevated Containment temperature will cause the Fuel Zone level indications to become erratic. | : 1. Termination Criteria | ||
With all other Reactor water level indicators downscale, the crew will execute N1-EOP-7, RPV Flooding, to lower Reactor pressure and flood the Reactor to the Main Steam lines (Critical Task). 1. Termination Criteria | : a. RPV Flooding in progress | ||
: a. RPV Flooding in progress | : b. Reactor water level on scale or upscale | ||
: b. Reactor water level on scale or upscale c. Containment pressure and temperature controlled in accordance with N1-EOP-4 Page 3 of 25 NRC Scenario 5 | : c. Containment pressure and temperature controlled in accordance with N1-EOP-4 Page 3 of 25 NRC Scenario 5 | ||
Generation CT-2, Given a LOCA in the Drywell, initiate Containment Sprays prior to exceeding the Pressure Suppression Pressure limit, in accordance with N1-EOP-4 Justification: | Exelon Generation | ||
Safetv Significance: | : 2. Critical Tasks CT-1, Given an inadvertently open ERV at power, close the ERV or insert a manual scram prior to Torus temperature exceeding 110°F, in accordance with N1-SOP-1.4 Justification: | ||
Initiating Containment Sprays reduces Primary Containment pressure. | Safety Significance: A manual Reactor scram is required before Torus temperature exceeds 110° F. This reduces the rate of energy production and thus heat input to the Torus. Additionally, this allows evaluating the success of the Reactor scram before boron injection would be required due to Torus temperature in the event of a failure to scram. Closing the ERV prior to the need for the scram avoids the need for these more substantial actions, prevents challenging the plant with a scram, and stops heat input to the Torus. | ||
This reduces stresses on the Drywell and Torus, assists in avoiding "chugging" that may cause fatigue failure of the LOCA downcomers, and avoids the need for a blowdown. | Cueing: ERV position, ERV acoustic monitors, ERV tailpipe temperature, Torus temperature, Reactor pressure, and steam flow indicate an open ERV. N1-SOP-1.4 provides direction to close the ERV or scram the Reactor. | ||
These benefits reduce challenges to the fuel cladding, the RPV, and the Primary Containment. | Measurable Performance Indicators: Pulling ERV fuses, directing an operator to pull ERV fuses in the field, rotating the Mode Switch to SHUTDOWN, and/or depressing the manual scram pushbuttons will provide observable actions for the evaluation team. | ||
Cueing: Multiple Primary Containment pressure and temperature indications and annunciators will indicate degrading conditions. | Performance Feedback: ERV position, ERV acoustic monitors, ERV tailpipe temperature, Torus temperature, Reactor pressure, and steam flow will provide performance feedback regarding success of crew actions to close the ERV. Control rod position and Reactor power will provide performance feedback regarding success of crew actions to scram the Reactor. | ||
N1-EOP-4 provides direction to initiate Containment Sprays. Measurable Performance Indicators: | Page 4 of 25 NRC Scenario 5 | ||
Manipulation of Containment Spray pump control switches will provide observable actions for the evaluation team. Performance Feedback: | |||
Containment Spray flow and lowering Primary Containment pressure and temperature indications will provide performance feedback regarding success of crew actions to initiate Containment Sprays. CT-3, Given the plant with RPV water level unknown, execute N1-EOP-7, RPV Flooding, in accordance with N1-EOP-2. | =~Exelon Generation CT-2, Given a LOCA in the Drywell, initiate Containment Sprays prior to exceeding the Pressure Suppression Pressure limit, in accordance with N1-EOP-4 Justification: | ||
Safetv Significance: Initiating Containment Sprays reduces Primary Containment pressure. This reduces stresses on the Drywell and Torus, assists in avoiding "chugging" that may cause fatigue failure of the LOCA downcomers, and avoids the need for a blowdown. These benefits reduce challenges to the fuel cladding, the RPV, and the Primary Containment. | |||
Cueing: Multiple Primary Containment pressure and temperature indications and annunciators will indicate degrading conditions. N1-EOP-4 provides direction to initiate Containment Sprays. | |||
Measurable Performance Indicators: Manipulation of Containment Spray pump control switches will provide observable actions for the evaluation team. | |||
Performance Feedback: Containment Spray flow and lowering Primary Containment pressure and temperature indications will provide performance feedback regarding success of crew actions to initiate Containment Sprays. | |||
CT-3, Given the plant with RPV water level unknown, execute N1-EOP-7, RPV Flooding, in accordance with N1-EOP-2. | |||
Justification: | Justification: | ||
Safety Significance: | Safety Significance: With Reactor water level unknown, the status of core cooling is unknown. RPV flooding is required to establish conditions to cool the core. This protects the fuel cladding integrity. | ||
With Reactor water level unknown, the status of core cooling is unknown. | Cueing: Multiple Reactor water level indications will indicate either downscale or invalid. N1-EOP-2 provides direction to implement N1-EOP-7, RPV Flooding. | ||
RPV flooding is required to establish conditions to cool the core. This protects the fuel cladding integrity. | Measurable Performance Indicators: Manipulation of ERVs, MS/Vs, EC/Vs, and injection system controls provide observable actions for the evaluation team. | ||
Cueing: Multiple Reactor water level indications will indicate either downscale or invalid. | Performance Feedback: ERV, MSIV, and EC/V position indications, Reactor pressure, ERV tailpipe temperatures, and ERV acoustic monitors provide performance feedback regarding success of RPV flooding actions. | ||
N1-EOP-2 provides direction to implement N1-EOP-7, RPV Flooding. | : 3. Length | ||
Measurable Performance Indicators: | : a. -60 minutes Page S of 25 NRC Scenario 5 | ||
Manipulation of ERVs, MS/Vs, EC/Vs, and injection system controls provide observable actions for the evaluation team. Performance Feedback: | |||
ERV, MSIV, and EC/V position indications, Reactor pressure, ERV tailpipe temperatures, and ERV acoustic monitors provide performance feedback regarding success of RPV flooding actions. | |||
: 3. Length a. -60 minutes Page S of 25 NRC Scenario 5 | |||
Generation | =:r-Exelon Generation | ||
: 8. Initial Conditions | : 4. Mitigation Strategy Code | ||
: 1. IC Number a. IC-155 2. Presets I With Triggers | : a. RL4, loss of all RPV level indication (non-ATWS), RPV Slowdown, RPV Flooding. | ||
: a. Malfunctions | : 5. Technical Specifications | ||
: 1) CT01B, CT Pump 112 Trip 2) HV01 B, Reactor Building Exhaust Fan Trip 12 3) ADOS, ERV 111 Failure -Opens Inadvertently | : a. TS 3.6.3 (b) | ||
: 4) ED12A, PB 16A Electrical Fault 5) CW04A, RBCLC Pump 11 Trip 6) CW04B, RBCLC Pump 12 Trip 7) CW04C, RBCLC Pump 13 Trip 8) FW03A, FEEDWATER PUMP TRIP 11 9) FW03B, FEEDWATER PUMP TRIP 12 10) FW06, SHAFT DRIVEN FEEDWATER PUMP CLUTCH DISENGAGES | : b. TS 3.1.5 (b) | ||
: 11) CU01, CU COOLANT LEAK INSIDE OF DRYWELL, FV=70, RT=5:00 12) EC01, Steam Supply Line Break in PC, FV=5, RT=5:00 13) VICP20168_FE CP-201-68, Fuel Zone Erratic Failure 14) VICP20169_FE CP-201-69, Fuel Zone Erratic Failure b. Remotes 1) AD01 A, ERV 111 Fuses, FV=pulled | : 6. EAL Classification | ||
: 2) AD07, Acoustic Monitor Alarm Reset, FV=reset | : a. Site Area Emergency per FS1 .1 - Loss or potential loss of ANY two fission product barriers. | ||
: 3) FW24. Removal of HPCI Fuses FU8/FU9, FV = pulled Page 7 of 25 NRC Scenario 5 | : 7. Special Orders | ||
_.,,,, Exelon Generation | : a. None Page 6 of 25 NRC Scenario 5 | ||
: c. Overrides | |||
: 1) OVR-5M76A03510 1F1/36-20 FV= -33.84 (LLL downscale indication) | =~Exelon Generation | ||
: 2) OVR-5M75A03500 1 F1/36-19 FV= -33.84 (LLL downscale indication) | : 8. Initial Conditions | ||
: d. Annunciators | : 1. IC Number | ||
: 1) None e. Event Triggers TRG 5 -Activates on Reactor zdrpstdn==1 scram to insert loss of Feedwater. | : a. IC-155 | ||
TRG 7 -Activates on DW hzarrl19<0.075&&hzarrl20<0.075&&pctdw8 temp >200°F, LLL level below >200&&ctfdw>100 | : 2. Presets I With Triggers | ||
-20", and Containment Spray flow to Drywell >100 gpm to insert Fuel Zone erratic indication. | : a. Malfunctions | ||
: f. Equipment Out of Service 1) Containment Spray pump 112 in PTL with yellow tag | : 1) CT01B, CT Pump 112 Trip Inserted | ||
: 1) N1-0P-33A Section H.12 marked up to Step H.12.9. h. Miscellaneous | : 2) HV01 B, Reactor Building Exhaust Fan Trip 12 Inserted | ||
: 3) ADOS, ERV 111 Failure - Opens Inadvertently TRG 1 | |||
: 4) ED12A, PB 16A Electrical Fault TRG3 | |||
: 5) CW04A, RBCLC Pump 11 Trip TRG4 | |||
: 6) CW04B, RBCLC Pump 12 Trip TRG4 | |||
: 7) CW04C, RBCLC Pump 13 Trip TRG4 | |||
: 8) FW03A, FEEDWATER PUMP TRIP 11 TRG5 | |||
: 9) FW03B, FEEDWATER PUMP TRIP 12 TRG5 | |||
: 10) FW06, SHAFT DRIVEN FEEDWATER PUMP CLUTCH FAILS- TRG5 DISENGAGES | |||
: 11) CU01, CU COOLANT LEAK INSIDE OF DRYWELL, FV=70, RT=5:00 TRG6 | |||
: 12) EC01, Steam Supply Line Break in PC, FV=5, RT=5:00 TRG6 | |||
: 13) VICP20168_FE CP-201-68, Fuel Zone Erratic Failure TRG7 | |||
: 14) VICP20169_FE CP-201-69, Fuel Zone Erratic Failure TRG7 | |||
: b. Remotes | |||
: 1) AD01 A, ERV 111 Fuses, FV=pulled TRG27 | |||
: 2) AD07, Acoustic Monitor Alarm Reset, FV=reset TRG 28 | |||
: 3) FW24. Removal of HPCI Fuses FU8/FU9, FV = pulled TRG9 Page 7 of 25 NRC Scenario 5 | |||
_.,,,, Exelon Generation | |||
: c. Overrides | |||
: 1) OVR-5M76A03510 1F1/36-20 FV= -33.84 (LLL downscale indication) TRG7 | |||
: 2) OVR-5M75A03500 1 F1/36-19 FV= -33.84 (LLL downscale indication) | |||
: d. Annunciators | |||
: 1) None | |||
: e. Event Triggers TRG 5 - Activates on Reactor zdrpstdn==1 Blank scram to insert loss of Feedwater. | |||
TRG 7 -Activates on DW hzarrl19<0.075&&hzarrl20<0.075&&pctdw8 Blank temp >200°F, LLL level below >200&&ctfdw>100 | |||
-20", and Containment Spray flow to Drywell >100 gpm to insert Fuel Zone erratic indication. | |||
: f. Equipment Out of Service | |||
: 1) Containment Spray pump 112 in PTL with yellow tag | |||
: 2) Containment Spray suction isolation valve 112 closed with yellow tag | |||
: 3) Reactor Building Exhaust fan 12 OOS with yellow tag | |||
: g. Support Documentation | |||
: 1) N1-0P-33A Section H.12 marked up to Step H.12.9. | |||
: h. Miscellaneous | |||
: 1) Ensure Drywell cooling fan 11 is secured with control switch in neutral. | : 1) Ensure Drywell cooling fan 11 is secured with control switch in neutral. | ||
: 2) Protect the following equipment: EDG102, EDG 103, PB 102, PB 103, Line 1, MOD 8106. | |||
EDG102, EDG 103, PB 102, PB 103, Line 1, MOD 8106. 3) Update Divisional Status Board. Page 8 of 25 NRC Scenario 5 | : 3) Update Divisional Status Board. | ||
Exelon Generation SHIFT TURNOVER INFORMATION ON COMING SHIFT: | Page 8 of 25 NRC Scenario 5 | ||
* Control Panel Walkdown (all panels) (SRO, ROs) PART II: To be reviewed by the oncoming Operator before assuming the shift. | ~* Exelon Generation SHIFT TURNOVER INFORMATION ON COMING SHIFT: IN ID DATE: -=Tc..: :oo.. =d=a_,_y_ __ | ||
PARTI: To be performed by the oncoming Operator before assuming the shift. | |||
* Control Panel Walkdown (all panels) (SRO, ROs) | |||
PART II: To be reviewed by the oncoming Operator before assuming the shift. | |||
* LCO Status (SRO) | * LCO Status (SRO) | ||
* Shift Turnover Information Sheet Evolutions/General Information/Equipment Status: | * Shift Turnover Information Sheet Evolutions/General Information/Equipment Status: | ||
Line 2,245: | Line 3,088: | ||
* Containment Spray pump 112 is out of service for maintenance (Day 1 of planned 2 day window; 15 day LCO per TS 3.3.7.b). | * Containment Spray pump 112 is out of service for maintenance (Day 1 of planned 2 day window; 15 day LCO per TS 3.3.7.b). | ||
* Reactor Building Exhaust Fan 12 is out of service for maintenance. | * Reactor Building Exhaust Fan 12 is out of service for maintenance. | ||
PART Ill: Remarks/Planned Evolutions: | PART Ill: Remarks/Planned Evolutions: | ||
* Remove Line 4 from service per N1-0P-33A Section H.12 to support National Grid maintenance. | * Remove Line 4 from service per N1-0P-33A Section H.12 to support National Grid maintenance. The procedure has been completed up to Step H.12.9. | ||
The procedure has been completed up to Step H.12.9. Page 9 of 25 NRC Scenario 5 | Page 9 of 25 NRC Scenario 5 | ||
Exelon Generation Shift Turnover Take the Simulator out of freeze before the crew enters for the pre-shift walkdown. | |||
~* Exelon Generation Shift Turnover Take the Simulator out of freeze before the crew enters for the pre-shift walkdown. | |||
* Verify annunciator sound turned on | * Verify annunciator sound turned on | ||
* If recording | * If recording scenario, start the recording device during the pre-shift walkdown Allow no more than 5 minutes to walkdown the Crew panels. | ||
* Walkdown panels | * Walkdown panels | ||
* Conduct shift turnover brief | * Conduct shift turnover brief | ||
* Assume the shift Page 10 of 25 | * Assume the shift Page 10 of 25 NRC Scenario 5 | ||
Generation Event #1: Remove Line 4 From Service | =~Exelon Generation Event #1: Remove Line 4 From Service | ||
* Initial reactor power is -100% | * Initial reactor power is -100% | ||
* The crew will remove line 4 from service SRO | * The crew will remove line 4 from service SRO | ||
* Directs removing Line 4 from service per N1-0P-33A Section H .12 | * Directs removing Line 4 from service per N1-0P-33A Section H.12 | ||
* Provides oversight for evolution | * Provides oversight for evolution | ||
* Determines Technical Specification 3.6.3.b requires returning Line 4 to service within 7 days. BOP | * Determines Technical Specification 3.6.3.b requires returning Line 4 to service within 7 days. | ||
BOP | |||
* Reviews N1-0P-33A Section H.12 | * Reviews N1-0P-33A Section H.12 | ||
* Verifies Auto Reclosure for R-40 breaker is OFF | * Verifies Auto Reclosure for R-40 breaker is OFF | ||
* Opens breaker R-40 | * Opens breaker R-40 | ||
* Dispatches Operator to confirm R-40 open locally on ALL 3 phases When asked as Operator to confirm R40 position, | * Dispatches Operator to confirm R-40 open locally Role Play: on ALL 3 phases When asked as Operator to confirm R40 position, | ||
* Notifies SM to review TS for appropriate LCO immediately report all three phases of R-40 are open. applicability | * Notifies SM to review TS for appropriate LCO immediately report all three phases of R-40 are open. applicability | ||
* Continues at Section H.9.0, Loss of 115 KV Line 4 ATC | * Continues at Section H.9.0, Loss of 115 KV Line 4 | ||
ATC | |||
* Monitors plant parameters | * Monitors plant parameters | ||
* Provides peer checks as needed | * Provides peer checks as needed | ||
* Line 4 removed from service Page 11 of 25 | * Line 4 removed from service Page 11 of 25 NRC Scenario 5 | ||
,..,.,,, | |||
Exelon Generation Event #2: ERV 111 Inadvertently Opens | ,..,.,,, Exelon Generation Event #2: ERV 111 Inadvertently Opens | ||
* ERV 111 Inadvertently Opens | * ERV 111 Inadvertently Opens | ||
* Operators will respond per SOP-1.4 to attempt to shut the ERV and SOP1 .1 to lower power. | * Operators will respond per SOP-1.4 to attempt to shut the ERV and SOP1 .1 to lower power. | ||
* The ERV will shut when fuses are pulled When directed by lead examiner, insert malfunction: | * The ERV will shut when fuses are pulled When directed by lead examiner, insert CREW malfunction: | ||
* Acknowledges/reports annunciators | * Acknowledges/reports annunciators | ||
* Diagnoses ERV 111 has inadvertently opened Page 12 of 25 | * Diagnoses ERV 111 has inadvertently opened ADOS, ERV 111 Failure - Opens Inadvertently TRG 1 ERV 111 opens Reactor pressure lowers slightly Reactor power lowers and then rises slightly Torus temperature rises Torus level rises Expected annunciators: | ||
F1-4-8, STEAM LINE DETECTION SYS FLOW OFF NORM F2-4-1, MAIN STM LINE ELECTROMA TIC RELIEF VALVE OPEN H3-4-5, PRESS SAFETY/RELIEF VALVES FLOW Page 12 of 25 NRC Scenario 5 | |||
Generation SRO Event 2 continued | =~Exelon Generation SRO Event 2 continued | ||
* Acknowledges reports | * Acknowledges reports | ||
* Directs entry into N 1-SOP-1.4, Stuck Open ERV | * Directs entry into N 1-SOP-1.4, Stuck Open ERV | ||
Line 2,289: | Line 3,133: | ||
* Directs taking action to close ERV 111 or directs a manual scram prior to Torus temperature exceeding 110°F, in accordance with N1-SOP-1.4 CT-1 | * Directs taking action to close ERV 111 or directs a manual scram prior to Torus temperature exceeding 110°F, in accordance with N1-SOP-1.4 CT-1 | ||
* Acknowledges that ERV 111 has closed | * Acknowledges that ERV 111 has closed | ||
* Enters N1-EOP-4 if Torus temp rises above 85°F or Torus level rises above 11.25' -Directs Containment Spray to PTL | * Enters N1-EOP-4 if Torus temp rises above 85°F or Torus level rises above 11.25' | ||
- Directs Containment Spray to PTL | |||
* May direct initiation of Torus Cooling per N1-EOP-1 att 16 or N1-SOP-1.4 ATC | * May direct initiation of Torus Cooling per N1-EOP-1 att 16 or N1-SOP-1.4 ATC | ||
* Performs emergency power reduction per N 1-SOP-1.1 | * Performs emergency power reduction per N 1-SOP-1.1 | ||
Line 2,298: | Line 3,143: | ||
* Monitors position on power to flow map | * Monitors position on power to flow map | ||
* If Torus temperature approaches 110°F, inserts manual Reactor scram CT-1 Page 13 of 25 NRC Scenario 5 | * If Torus temperature approaches 110°F, inserts manual Reactor scram CT-1 Page 13 of 25 NRC Scenario 5 | ||
Exelon Generation Event 2 continued Role Play: When directed as Operator to go to Auxiliary Control Room and verify ERV 111 is open, wait one minute and report ERV 111 is open. Subsequent reports on acoustic monitor status may be given immediately, with close attention paid to the actual status of the ERV. | |||
Exelon Generation Event 2 continued BOP | |||
* Enters N1-SOP-1.4 Role Play: When directed as Operator to go to | |||
* Determines ERV 111 is open using: | |||
Auxiliary Control Room and verify ERV 111 is open, - Valve indicating lights on F panel wait one minute and report ERV 111 is open. - Red ERV flow indicating light on F panel Subsequent reports on acoustic monitor status may | |||
* Sends an operator to the Aux Control Room to be given immediately, with close attention paid to the actual status of the ERV. verify ERV open using Acoustic Monitor | |||
* May send an operator to RB 237' to standby for pulling local ERV fuses | * May send an operator to RB 237' to standby for pulling local ERV fuses | ||
* Attempts to close ERV 111 by performing one or all of the following: | * Attempts to close ERV 111 by performing one or Note: Safety glasses, gloves, and long sleeves or a all of the following: | ||
Depresses ADS Timer Reset pushbuttons Cycles Control Switch for ERV 111 Pulls control power fuses F15 and F30 in F panel (ERV 111) o OR Directs operator to pull ERV 111 fuses on RB 237' CT-1 | lab coat are required for pulling fuses in F panel. Depresses ADS Timer Reset pushbuttons Cycles Control Switch for ERV 111 Pulls control power fuses F15 and F30 in F panel (ERV 111) | ||
* Checks with operator in Aux Control Room to see if ERV is still open | Role Play: If the Operator is directed to pull fuses in o OR the RB wait 3 minutes and insert remote: Directs operator to pull ERV 111 fuses on AD01A, ERV 111 Fuses, FV=pulled RB 237' CT-1 TRG27 | ||
* Checks with operator in Aux Control Room to see Report fuses are pulled. | |||
if ERV is still open | |||
* Determines/verifies ERV closes | * Determines/verifies ERV closes | ||
* Directs reset of acoustic monitor | * Directs reset of acoustic monitor Role Play: When directed as operator to reset the | ||
* Notifies crew that ERV 111 has closed | * Notifies crew that ERV 111 has closed acoustic monitor, wait 1 minute and insert remote: | ||
* Monitors Torus temperature | * Monitors Torus temperature AD07, Acoustic Monitor Alarm Reset, FV=reset | ||
* Reports if/when Torus temperature exceeds 85°F or Torus level exceeds 11.25' Places Containment Spray pumps in PTL if directed Page 14 of 25 NRC Scenario 5 | * Reports if/when Torus temperature exceeds 85°F or Torus level exceeds 11.25' TRG28 Places Containment Spray pumps in PTL if Report acoustic monitor is reset. directed Page 14 of 25 NRC Scenario 5 | ||
Exelon Generation | |||
* Places Torus cooling in service when directed, per N1-SOP-1.4, att 2 or N1-EOP-1 att 16: Close CONT SPRAY BYPASS BV(s) for selected loop Verifies closed 80-115 Verifies closed 80-114 Verifies closed Cont Spray Discharge IV for selected loop Verifies open CONT SPRAY BYPASS BV for selected loop Fully opens 80-118 Starts Containment Spray Raw Water pump in selected loop Starts Containment Spray pump in selected loop Page 15 of 25 | Exelon Generation BOP continued | ||
* Places Torus cooling in service when directed, per N1-SOP-1.4, att 2 or N1-EOP-1 att 16: | |||
Close CONT SPRAY BYPASS BV(s) for selected loop Verifies closed 80-115 Verifies closed 80-114 Verifies closed Cont Spray Discharge IV for selected loop Verifies open CONT SPRAY BYPASS BV for selected loop Fully opens 80-118 Starts Containment Spray Raw Water pump in selected loop Starts Containment Spray pump in selected loop Page 15 of 25 NRC Scenario 5 | |||
=:rExelon Generation Event #3: Powerboard 16A Electrical Fault | =:rExelon Generation Event #3: Powerboard 16A Electrical Fault | ||
* The plant experiences an electrical fault on PB 16A | * The plant experiences an electrical fault on PB 16A | ||
* The crew will take action to mitigate further degradation to the plant. When directed by examiner, insert malfunction: | * The crew will take action to mitigate further degradation to the plant. | ||
CREW | When directed by examiner, insert malfunction: CREW ED12A, PB 16A Electrical Fault | ||
* Recognize/report loss of Powerboard 16A | * Recognize/report loss of Powerboard 16A | ||
* Recognize/report trip of three Drywell cooling TRG3 fans Three Drywell cooling fans de-energize | * Recognize/report trip of three Drywell cooling TRG3 fans Three Drywell cooling fans de-energize Drywel/ pressure and temperature rise | ||
* Recognize/report trip of RBCLC pump 11 | * Recognize/report trip of RBCLC pump 11 Spent Fuel Pool Cooling pump 11 trips | ||
* Recognize/report Spent Fuel Pool trouble alarm RBCLC pump 11 trips Expected Annunciators: | * Recognize/report Spent Fuel Pool trouble alarm RBCLC pump 11 trips Expected Annunciators: | ||
L4-3-6, DRYWELL COOLING FAN TRIP-VIB A4-3-1, POWER BO. 16 R1041 TRIP A4-4-2, POWER BO. 16 LOW BUS VOLTAGE L 1-4-5, FUEL POOL ANNUNCIATOR SRO | L4-3-6, DRYWELL COOLING FAN TRIP-VIB A4-3-1, POWER BO. 16 R1041 TRIP A4-4-2, POWER BO. 16 LOW BUS VOLTAGE L 1-4-5, FUEL POOL ANNUNCIATOR SRO | ||
Line 2,331: | Line 3,182: | ||
* Directs entry into N1-SOP-6.1, Loss of SFP/Rx Cavity Level/Decay Heat Removal | * Directs entry into N1-SOP-6.1, Loss of SFP/Rx Cavity Level/Decay Heat Removal | ||
* May direct start of RBCLC pump 12 Page 16 of 25 NRC Scenario 5 | * May direct start of RBCLC pump 12 Page 16 of 25 NRC Scenario 5 | ||
Exelon Generation Event 3 continued ATC | |||
Exelon Generation Event 3 continued ATC | |||
* Monitors plant parameters | * Monitors plant parameters | ||
* If directed, lowers Reactor power per N1-SOP-1.1 BOP | * If directed, lowers Reactor power per N1-SOP-1.1 BOP | ||
* Executes ARPs | * Executes ARPs | ||
* Dispatches operator/maintenance to investigate Powerboard 16A Role Play: | * Dispatches operator/maintenance to investigate Powerboard 16A Role Play: | ||
* Dispatches operator to investigate Spent Fuel If requested to investigate Powerboard 16A, wait 2 | * Dispatches operator to investigate Spent Fuel Pool alarm If requested to investigate Powerboard 16A, wait 2 minutes, then report the feeder breaker is tripped and | ||
* Acknowledges/reports Powerboard 16A is faulted there is an acrid odor in the area. Electrical | * Acknowledges/reports Powerboard 16A is faulted there is an acrid odor in the area. Electrical | ||
* Starts Drywell cooling fan 11 Maintenance does NOT recommend re-energizing | * Starts Drywell cooling fan 11 Maintenance does NOT recommend re-energizing | ||
* May green flags Drywell cooling fans 14, 15, and Powerboard 16A. | * May green flags Drywell cooling fans 14, 15, and 16 Powerboard 16A. | ||
* May start RBCLC pump 12 | * May start RBCLC pump 12 | ||
* May green flag RBCLC pump 11 Role Play: | * May green flag RBCLC pump 11 Role Play: | ||
* If directed, lowers RBCLC temperature per N1-If requested to investigate SFPC trouble, wait 2 OP-11: minutes, then report SFPC pump 11 tripped. | * If directed, lowers RBCLC temperature per N1-If requested to investigate SFPC trouble, wait 2 OP-11: | ||
If 0 Places RBCLC TCV in manual: directed to restore SFPC, acknowledge order, but 0 Depresses the AIM Button UNTIL red delay any action for rest of scenario. | minutes, then report SFPC pump 11 tripped. If 0 Places RBCLC TCV in manual: | ||
LED is illuminated next to "M" 0 Verifies 70-238.V is displayed in the LED readout 0 IF 70-238.V is NOT displayed, THEN depresses the "D" button UNTIL the display shows 70-238.V 0 Adjusts RBCLC temperature as desired 0 May lower RBCLC TCV automatic setpoint per N1-0P-11 Section H.24.0 Page 17 of 25 NRC Scenario 5 | directed to restore SFPC, acknowledge order, but 0 Depresses the AIM Button UNTIL red delay any action for rest of scenario. | ||
LED is illuminated next to "M" 0 Verifies 70-238.V is displayed in the LED readout 0 IF 70-238.V is NOT displayed, THEN depresses the "D" button UNTIL the display shows 70-238.V 0 Adjusts RBCLC temperature as desired 0 May lower RBCLC TCV automatic setpoint per N1-0P-11 Section H.24.0 Page 17 of 25 NRC Scenario 5 | |||
Generation | =~Exelon Generation BOP continued o May place RBCLC TCV back in automatic: | ||
o Depresses the AIM Button UNTIL green LED is illuminated next to "A" o Verifies 70-238. P is displayed in the LED readout o IF 70-238.P is NOT displayed, THEN depresses the "D" button UNTIL the display shows 70-238. P o Verifies TCV-70-137 is responding properly to automatic control | Event 3 continued o Depresses the AIM Button UNTIL green LED is illuminated next to "A" o Verifies 70-238. P is displayed in the LED readout o IF 70-238.P is NOT displayed, THEN depresses the "D" button UNTIL the display shows 70-238. P o Verifies TCV-70-137 is responding properly to automatic control | ||
* If directed, places Containment Spray pumps in PTL Page 18 of 25 Exelon Generation Events #4 and #5 : All RBCLC Pumps Trip, Feedwater Pumps Fail to Operate | * If directed, places Containment Spray pumps in PTL Page 18 of 25 NRC Scenario 5 | ||
Exelon Generation Events #4 and #5 : All RBCLC Pumps Trip, Feedwater Pumps Fail to Operate | |||
* A trip of the running RBCLC pumps occurs with no standby pump available. | * A trip of the running RBCLC pumps occurs with no standby pump available. | ||
* The crew will execute the override actions of N 1-SOP-11.1. | * The crew will execute the override actions of N 1-SOP-11.1. | ||
* A loss of all HP feed water occurs on the scram. When directed by lead examiner, insert malfunction: | * A loss of all HP feed water occurs on the scram. | ||
CW04A, RBCLC Pump 11 Trip CW048, RBCLC Pump 12 Trip CW04C, RBCLC Pump 13 Trip RBCLC pumps trip RBCLC pressure lowers RBCLC temperature Expected Annunciators: | When directed by lead examiner, insert CREW malfunction: | ||
* Recognize/report trip of all RBCLC pumps CW04A, RBCLC Pump 11 Trip | |||
* Later: | |||
CW048, RBCLC Pump 12 Trip o Recognize/report Feedwater pump 11 and 12 trips CW04C, RBCLC Pump 13 Trip o Recognize/report Feedwater pump 13 TRG4 disengages RBCLC pumps trip o Recognize/report low Reactor water level RBCLC pressure lowers RBCLC temperature Expected Annunciators: | |||
=:rExelon Generation Events 4 and 5 continued Verify the following malfunctions are automatically | H1-1-1, REACTOR BLDG COOL PUMP 11 TRIP-V-SUCT H1-2-1, REACTOR BLDG COOL PUMP 12 TRIP-V-SUCT H1-3-1, REACTOR BLDG COOL PUMP 13 TRIP-V-SUCT H1-4-1, R BUILDING COOLING WATER PRESS TEMP MAKEUP FLOW K2-4-3, DRYWELL PRESSURE HIGH-LOW K3-4-4, CLEAN-UP SYSTEM /SOLA TION Page 19 of 25 NRC Scenario 5 | ||
=:rExelon Generation Events 4 and 5 continued SRO | |||
* Directs entry into N1-SOP-11.1 | * Acknowledges reports Verify the following malfunctions are automatically | ||
* Direct start of standby RBCLC pump | * Directs entry into N1-SOP-11.1 inserted when the Reactor scrams: | ||
* Acknowledges trip of all RBCLC pumps | * Direct start of standby RBCLC pump FW03A, FEEDWATER PUMP TRIP 11 | ||
* Acknowledges trip of all RBCLC pumps FW038, FEEDWATER PUMP TRIP 12 | |||
* Directs execution of override, including: | * Directs execution of override, including: | ||
o Manual Reactor scram o Trip Recirculation pumps o Initiate Emergency Condensers o Close MSIVs o Trip RWCU pump | o Manual Reactor scram FW06, FW06, SHAFT DRIVEN FEEDWATER PUMP o Trip Recirculation pumps CLUTCH FAILS - DISENGAGES o Initiate Emergency Condensers TRG5 o Close MSIVs Feedwater pumps 11 and 12 trip immediately after starting, o Trip RWCU pump Feedwater pump 13 disengages Reactor water level remains lower than normal | ||
* Acknowledges scram report | * Acknowledges scram report Expected Annunciators: | ||
* Enters N1-EOP-2, RPV Control, on low RPV water level | * Enters N1-EOP-2, RPV Control, on low RPV H3-1-7, REACTOR FWPUMP 11 TRIP OVERLOAD SUCTION HI-LEVEL water level H3-2-7, REACTOR FW PUMP 12 TRIP OVERLOAD | ||
* Answers "Are all control rods inserted to at least position 04 ?" YES | * Answers "Are all control rods inserted to at least SUCTION HI-LEVEL H3-4-8, REACTOR FW SHAFT P13 CLUTCH TROUBLE position 04 ?" YES F2-3-3, REACT VESSEL LEVEL HIGH-LOW | ||
* Directs entry into N 1-SOP-1, Reactor Scram | * Directs entry into N 1-SOP-1, Reactor Scram | ||
* Acknowledges trip of Feedwater pumps | * Acknowledges trip of Feedwater pumps Note: Expected initial RPV water level control band | ||
* Directs RPV water level controlled between -84" is narrower (ex. O" to 95"). and 95" using CRD and/or Liquid Poison | * Directs RPV water level controlled between -84" is narrower (ex. O" to 95"). and 95" using CRD and/or Liquid Poison | ||
* Directs RPV cooldown | * Directs RPV cooldown <100°F/hr using Emergency Condensers | ||
<100°F/hr using Emergency Condensers | * Enters N1-EOP-4, Primary Containment Control, on high Drywell temperature o Directs lockout of Containment Spray pumps Page 20 of 25 NRC Scenario 5 | ||
* Enters N1-EOP-4, Primary Containment | |||
Exelon Generation Events 4 and 5 continued ATC | |||
* Places Reactor Mode Switch to SHUTDOWN | * Places Reactor Mode Switch to SHUTDOWN | ||
* Provides scram report | * Provides scram report | ||
Line 2,379: | Line 3,235: | ||
* Confirms all rods inserted | * Confirms all rods inserted | ||
* Observes Reactor power lowering | * Observes Reactor power lowering | ||
* Places | * Places IRMs on range 9 | ||
* Inserts IRM and SRM detectors | * Inserts IRM and SRM detectors | ||
* Down-ranges IRMs as necessary | * Down-ranges IRMs as necessary | ||
Line 2,388: | Line 3,244: | ||
* Informs crew of need to execute override level may trip Recirculation pumps, initiate | * Informs crew of need to execute override level may trip Recirculation pumps, initiate | ||
* Enters N1-SOP-1 Emergency Condensers, and close MSIVs before | * Enters N1-SOP-1 Emergency Condensers, and close MSIVs before | ||
* Informs crew of Feedwater pump trips and low operator action. Reactor water level | * Informs crew of Feedwater pump trips and low operator action. Reactor water level | ||
* Trips Recirculation pumps Note: RWCU will likely trip on high temperature | * Trips Recirculation pumps Note: RWCU will likely trip on high temperature | ||
* Initiates Emergency Condensers before operator action. | * Initiates Emergency Condensers before operator action. | ||
* Closes MSIVs | * Closes MSIVs | ||
* Verifies RWCU pump tripped | * Verifies RWCU pump tripped | ||
* May maximize CRD flow by starting second CRD pump and/or taking FCV to manual and opening Note: Recommend initiating next event shortly after further the reactor is scrammed. | * May maximize CRD flow by starting second CRD pump and/or taking FCV to manual and opening Note: Recommend initiating next event shortly after further the reactor is scrammed. | ||
* May start Liquid Poison | * May start Liquid Poison | ||
* Places Containment Spray pumps in PTL Page 21 of 25 NRC Scenario 5 | * Places Containment Spray pumps in PTL Page 21 of 25 NRC Scenario 5 | ||
Exelon Generation Events #6 and #7: Coolant Leak Inside Primary Containment and Fuel Zone Level Instrument Erratic Indication | Exelon Generation Events #6 and #7: Coolant Leak Inside Primary Containment and Fuel Zone Level Instrument Erratic Indication | ||
* A reactor coolant leak develops in the drywell | * A reactor coolant leak develops in the drywell | ||
* When containment parameters degrade sufficiently, fuel zone level instrumention will begin to give erratic indication and drive the crew into RPV Flooding. | * When containment parameters degrade sufficiently, fuel zone level instrumention will begin to give erratic indication and drive the crew into RPV Flooding. | ||
When directed by examiner, insert malfunctions: | When directed by examiner, insert malfunctions: CREW CU01, CU Coolant Leak Inside of Drywell, RT=5:00, | ||
CU01, CU Coolant Leak Inside of Drywell, RT=5:00, FV=70 EC01, Steam Supply Line Break in PC, RT=5:00, FV=5 | * Recognize/report degrading Containment FV=70 parameters EC01, Steam Supply Line Break in PC, RT=5:00, FV=5 TRG6 Containment parameters degrade RPV water level lowers Expected annunciators: | ||
H2-4-7, DRYWELL WATER LEAK DETECTION SYS K2-4-3, DRYWELL PRESSURE HIGH-LOW L 1-4-4, DRYWELL - TORUS TEMP HIGH F1-1-5, RPS CH 11 DRYWELL PRESS HIGH F4-1-4, RPS CH 12 DRYWELL PRESS HIGH F1-2-3, RPS CH 11 REACTOR LEVEL LOW-LOW F4-2-6, RPS CH 12 REACTOR LEVEL LOW-LOW F1-3-3, RPS CH 11 REACTOR LEVEL LOW-LOW-LOW F4-3-6, RPS CH 12 REACTOR LEVEL LOW-LOW-LOW Page 22 of 25 NRC Scenario 5 | |||
H2-4-7, DRYWELL WATER LEAK DETECTION SYS K2-4-3, DRYWELL PRESSURE HIGH-LOW L 1-4-4, DRYWELL -TORUS TEMP HIGH F1-1-5, RPS CH 11 DRYWELL PRESS HIGH F4-1-4, RPS CH 12 DRYWELL PRESS HIGH F1-2-3, RPS CH 11 REACTOR LEVEL LOW-LOW F4-2-6, RPS CH 12 REACTOR LEVEL LOW-LOW F1-3-3, RPS CH 11 REACTOR LEVEL LOW-LOW-LOW F4-3-6, RPS CH 12 REACTOR LEVEL LOW-LOW-LOW | |||
Generation Events 6 and 7 continued | =~Exelon Generation Events 6 and 7 continued SRO | ||
* Acknowledges reports from the crew | |||
* Re-enters N1-EOP-4 on high Drywell pressure | |||
* Re-enters N1-EOP-2 on high Drywell pressure | |||
* Acknowledges reports from the crew Re-enters N1-EOP-4 on high Drywell pressure Re-enters N1-EOP-2 on high Drywell pressure Transitions to Alternate Level Control leg of N1-EOP-2 Direct ADS bypassed Verifies EC initiation If either Drywell temperature approaches 300°F or Torus pressure exceeds 13 psig: o Answers "Below the Containment Spray Initiation Limit?" Yes o Verifies all Recirc pumps tripped o Directs trip of all Drywell cooling fans o Direct Containment Sprays per N1-EOP-1 attachment 17 CT-2 | * Transitions to Alternate Level Control leg of N1-EOP-2 | ||
* Monitors location on Pressure Suppression Pressure curve | * Direct ADS bypassed | ||
* Acknowledges sporadic readings of Fuel Zones | * Verifies EC initiation | ||
* If either Drywell temperature approaches 300°F Note: Due to an already low RPV water level when or Torus pressure exceeds 13 psig: | |||
Drywell pressure reaches 3.5 psig, Containment o Answers "Below the Containment Spray Spray may auto-start before the crew can prevent it. | |||
Initiation Limit?" Yes In accordance with the EOPs, the crew will then o Verifies all Recirc pumps tripped verify proper operation per N1-EOP-1attachment17. | |||
o Directs trip of all Drywell cooling fans In this case, Critical Task 2 shall be evaluated as o Direct Containment Sprays per N1-EOP-1 "Not Applicable". | |||
attachment 17 CT-2 Verify the following malfunction is automatically | |||
* Monitors location on Pressure Suppression inserted when DW temp is above 200°F, LLL level Pressure curve indicates below -20", and Containment Spray has | |||
* Acknowledges sporadic readings of Fuel Zones been initiated: | |||
* Acknowledges RPV water level is unknown | * Acknowledges RPV water level is unknown | ||
* Exits N1-EOP-2, enters N1-EOP-7, RPV Flooding CT-3 Page 23 of 25 NRC Scenario 5 | * Exits N1-EOP-2, enters N1-EOP-7, RPV Flooding VICP20168_FE CP-201-68, Fuel Zone Erratic Failure CT-3 VICP20169_FE CP-201-69, Fuel Zone Erratic Failure TRG7 Fuel Zone indications give sporadic numbers All other RPV water level instruments are either downscale or below minimum usable levels Page 23 of 25 NRC Scenario 5 | ||
Exelon Generation SRO continued Events 6 and 7 continued | Exelon Generation SRO continued Events 6 and 7 continued | ||
* Answers "Are all control rods inserted to at least position 04?" Yes | * Answers "Are all control rods inserted to at least position 04?" Yes | ||
Line 2,418: | Line 3,282: | ||
* Directs open 4 ERVs | * Directs open 4 ERVs | ||
* Directs injection to flood the RPV to the main steam lines using low pressure Feedwater, CRD, Core Spray or Alternate Injection Systems | * Directs injection to flood the RPV to the main steam lines using low pressure Feedwater, CRD, Core Spray or Alternate Injection Systems | ||
* Answers "Can any ERV be opened?" | * Answers "Can any ERV be opened?" Yes | ||
Yes | |||
* Directs MSIVs and EC steam IVs verified closed | * Directs MSIVs and EC steam IVs verified closed | ||
* Acknowledges RPV water level rising ATC/BOP | * Acknowledges RPV water level rising ATC/BOP | ||
Line 2,426: | Line 3,289: | ||
* Verifies EC initiation | * Verifies EC initiation | ||
* Monitors Containment parameters | * Monitors Containment parameters | ||
* Reports if either Drywell temperature approaches 300°F or Torus pressure exceeds 13 psig Page 24 of 25 NRC Scenario 5 | * Reports if either Drywell temperature approaches 300°F or Torus pressure exceeds 13 psig Page 24 of 25 NRC Scenario 5 | ||
=:--Exelon Generation ATC/BOP Continued Events 6 and 7 continued | =:--Exelon Generation ATC/BOP Continued Events 6 and 7 continued | ||
* If Containment Spray did not auto-start earlier: | * If Containment Spray did not auto-start earlier: | ||
* Verifies all Recirc pumps tripped | * Verifies all Recirc pumps tripped | ||
* Trips all Drywell cooling fans | * Trips all Drywell cooling fans | ||
* Initiates Containment Sprays per N1 -EOP-1 attachment 17: | * Initiates Containment Sprays per N1 -EOP-1 attachment 17: | ||
* Verifies | CT-2 | ||
* Verifies started, two Containment Spray pumps | |||
* IF required to lower Containment | * IF required to lower Containment pressure, start additional Containment Spray Pumps | ||
* Reports Containment pressure and temperature lowering | * Reports Containment pressure and temperature lowering | ||
* Recognizes/reports sporadic Fuel Zone values | * Recognizes/reports sporadic Fuel Zone values | ||
Line 2,446: | Line 3,307: | ||
* Monitors for indications of successful flooding | * Monitors for indications of successful flooding | ||
* Reports RPV water level rising | * Reports RPV water level rising | ||
* RPV Flooding in progress | |||
* Reactor water level on scale or upscale | * Reactor water level on scale or upscale | ||
* Containment pressure and temperature controlled in accordance with N1-EOP-4. | * Containment pressure and temperature controlled in accordance with N1-EOP-4. | ||
Page 25 of 25 | Page 25 of 25 NRC Scenario 5 | ||
=::"Exelon Generation | |||
=::"Exelon Generation BOP continued | |||
* If any ERV is cycling: | * If any ERV is cycling: | ||
* Initiates Emergency Condensers | * Initiates Emergency Condensers | ||
Line 2,464: | Line 3,327: | ||
* RPV water level controlled in assigned band | * RPV water level controlled in assigned band | ||
* Reactor power < 6% | * Reactor power < 6% | ||
* Control rod insertion in progress or complete Page 28 of 28 March 2015}} | * Control rod insertion in progress or complete Page 28 of 28 NRC Scenario 3 March 2015}} |
Latest revision as of 07:37, 25 February 2020
ML15110A397 | |
Person / Time | |
---|---|
Site: | Nine Mile Point |
Issue date: | 02/18/2015 |
From: | Todd Fish Operations Branch I |
To: | Isham P Exelon Generation Co |
Shared Package | |
ML14238A301 | List: |
References | |
TAC U01905 | |
Download: ML15110A397 (270) | |
Text
Exelon Generation Training Id: 2015 NRC RO Admin C001 Revision: 0.0
Title:
Nl-ST-DO DAILY CHECKS (Partial)
Approvals:
Developed By P ,.?/J/~ Paul Isham 5/28/14 Validated By Leigh Mason, Dave Ballard 08/21/2014 Facility Reviewer Greg Elkins Approximate Duration: 20 minutes Documentation of Performance:
Performer:
Evaluator:
Start Time: ----
Stop Time: Completion Time Grade: Pass I Fail Comments:
Evaluators Signature: _ _ _ _ _ _ _ _ __ Date:
NRC JPM RO COOl Page 1of9 March 2015
Exelon Generation References
- 1. Nl-ST-DO, Daily Checks
- 2. NUREG 1123, 2.1.7 (4.4)
NRC JPM RO COOl Page 2 of 9 March 2015
=~Exelon Generation Instructor Information A. JPM Information
- 1. Description
- a. This JPM tests the operator's ability to record and interpret plant surveillance data and identify inoperable equipment. Control room RPV water level readings are taken for Nl-ST-DO. Out of spec readings and inoperable equipment are identified by the operator.
- 2. Task Information:
- a. NS-REL-01001, Perform System Surveillances.
- b. K/A 2.1.7 (4.4), Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.
- 3. Evaluation /Task Criteria Perform Classroom No No Yes
- 4. Recommended Start Location
- a. Simulator
- 1) Simulator will be in 'Freeze'. Therefore this cannot be performed in conjunction with a simulator JPM.
NRC JPM RO COOl Page 3 of 9 March 2015
Exelon Generation
- 5. JPM Setup (if required)
- a. Provide copies of Nl-ST-DO.
- b. Initialize simulator to IC-166
- c. Plant is operating "'15% power
- d. Verify the following overrides are set:
- 1) 5M80A03550 = 73.00
- 2) 5M81A03560 = 75.00
- 3) 5M118A03860 = 76.00
- 4) 5M116A03840 = 68.00
- 5) 5AR1TS1A031000 = 68.00
- 6) 13M1A042680 = 69.00
- 7) 9M53A051270 = 70.50
- e. Take the simulator to Run, and then back to Freeze
- f. Verify average Drywell temperature is less than 130°F
- g. Verify total Recirc flow is 38 Mlbm/hr
- h. Verify FWLC is selected to column 11
Exelon Generation B. Read Before Every JPM Performance
- 1. For the performance of this JPM, I will act as all those you need to talk to.
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated.
Repositioning of devices will be simulated by discussion and acknowledged by my cues.
- c. Read Before Each Evaluated JPM
- 1. This evaluated JPM is a measure of your ability to perform this task independently. The CRS has determined that a verifier is not available and that additional verification will not be provided.
NRC JPM RO COOl Page 5 of 9 March 2015
Exelon Generation Given:
- The plant is operating at approximately 15% power.
- Nl-ST-DO, Daily Checks, is in progress.
- The provided printout shall be used to determine computer point and PI data.
- The process computer is unavailable Evaluator: Ask trainee if he/she has any questions after presenting initial conditions
{Operators Name), obtain the instrument readings needed from control room panels to complete Nl-ST-DO Attachment 4 sections 5.0 and 6.0 only, then complete section 8.4 in the body of the procedure. When completed, report findings and provide completed sections to SRO.
- 1. Provide repeat back of initiating cue SAT/ UNSAT p
Cue: Acknowledge repeat back providing STD: Proper communications correction if necessary. used.
- 2. Obtain a copy of the reference procedure and SAT/ UNSAT review / utilize the correct section of the STD: Nl-ST-DO Obtained, procedure.
sections 5.0 and 6.0 p referenced.
Note: Completed Nl-ST-DO is attached as JPM key. Small differences in recorded values may occur due to instrument interpolation.
- 3. Records section 5.0 readings SAT/ UNSAT p STD: Records Reactor Recirc Pump Inlet Temperature readings on Attachment 4 Section 5.0 NRC JPM RO C001 Page 6 of 9 March 2015
- 4. Compare Recirc Pump Inlet Temperature SAT/ UNSAT readings and determines readings within p STD: Compares readings and 15°F determines readings within l5°F of each other PASS I FAIL p STD: Checks YES block in Section 5.0, indicating the maximum difference in loop temperatures is < l5°F
- 5. Record section 6.0 readings SAT/ UNSAT p STD: Records RPV water level Cue: Another operator has completed the readings on Attachment 4 required Independent Verifications. section 6.0
- 6. Record Total Recirc Flow SAT I UNSAT p STD: Records total recirc flow in the correct box on Attachment 4 section 6.0
- 7. Determines average Drywell temperature SAT I UNSAT /NA p STD: Observes average Drywell Note: Since Yarway level indicator deviation temperature is less than 125°F is less than 4 inches, Drywell temperature reading is not necessary for task completion.
- 8. Analyzes Yarway level indicator deviation PASS/ FAIL p STD: Determines Yarway level Note: This may be evidenced by the lack of indicator deviation is less than a report to the contrary.
the 6 inch limit
- 9. Analyzes GEMAC level indicator deviation PASS/ FAIL p STD: Determines GEMAC level indicator deviation is greater than the 6 inch limit NRC JPM RO COOl Page 7 of 9 March 2015
Exelon Generation
- 10. Determines GEMAC level indicators are PASS/ FAIL inoperable p STD: Checks INOP option in step 8.4
- 11. Provides completed sections to SRO and SAT/ UNSAT p STD: Proper communications informs of out of spec readings used.
Control room readings are taken. Out of spec readings are identified to SRO and inoperable equipment is identified by the candidate.
NRC JPM RO COOl Page 8 of 9 March 2015
=::""Exelon Generation JPM Handout Given:
- The plant is operating at approximately 15% power.
- Nl-ST-DO, Daily Checks, is in progress.
- The provided printout shall be used to determine computer point and PI data.
- The process computer is unavailable (Operators Name), obtain the instrument readings needed from control room panels to complete Nl-ST-DO Attachment 4 sections 5.0 and 6.0 only, then complete section 8.4 in the body of the procedure. When completed, report findings and provide completed sections to SRO.
NRC JPM RO C001 Page 9 of 9 March 2015
=~Exelon Generation Training Id: 2015 NRC RO Admin JPM EP Revision: 0.0
Title:
Perform CRO Firefighting Checklist Approvals:
Developed By Paul Isham 5/28/14 Validated By Leigh Mason 8/21/14 Facility Reviewer Greg Elkins Approximate Duration: 15 minutes Documentation of Performance:
Performer:
Evaluator:
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments:
Evaluators Signature: Date:
NRC JPM RO EP Page 1 of 8 March 2015
Exelon Generation References
- 1. EPIP-EPP-28, Firefighting
- 2. NU REG 1123, 2.4.27 (3.4)
NRC JPM RO EP Page 2 of 8 March 2015
Exelon Generation Instructor Information A. JPM Information
- 1. Description
- a. This JPM tests the operator's ability to carry out control room actions for a fire in the plant. The operator will execute the CRO Firefighting Checklist.
- 2. Task Information:
- a. Nl-286000-01023, Respond to a Plant Fire
- b. K/ A 2.4.27 (3.4 ), Knowledge of "fire in the plant" procedures
- 3. Evaluation/ Task Criteria Perform Classroom No No Yes
- 4. Recommended Start Location
- a. Simulator
- 5. JPM Setup (if required)
&=r-Exelon Generation B. Read Before Every JPM Performance
- 1. For the performance of this JPM, I will act as all those you need to talk to.
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated.
Repositioning of devices will be simulated by discussion and acknowledged by my cues.
C. Read Before Each Evaluated JPM
- 1. This evaluated JPM is a measure of your ability to perform this task independently. The CRS has determined that a verifier is not available and that additional verification will not be provided.
NRC JPM RO EP Page 4 of 8 March 2015
=::"Exelon Generation Given:
- The plant is operating at approximately 100% power.
- You are the CRO.
- You have just received a report from site electricians that there is a significant fire in EDG 102 room.
- The OSC has NOT been activated.
Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), perform EPIP-EPP-28 Attachment 1, CRO Firefighting Checklist.
- 1. Provide repeat back of initiating cue SAT/ UNSAT p
Cue: Acknowledge repeat back providing STD: Proper communications correction if necessary. used.
- 2. Obtain a copy of the reference procedure and SAT I UNSAT review/ utilize the correct section of the STD: Obtains a copy of EPIP-EPP-28. References procedure. p attachment 1, CRO Firefighting Checklist
- 3. Place the GAitronics in the "Merge" Mode. SAT/ UNSAT STD: Places the GAitronics in p the "MERGE" mode by placing the switch on the Communications Console in the Control Room to the "MERGE" position.
NRC JPM RO EP Page 5 of 8 March 2015
- S
- rExelon Generation
- 4. Sound the fire alarm for 10 seconds and PASS I FAIL announce the fire event.
STD: Sounds the fire alarm and makes the following Cue: As the Fire Brigade Leader reply that, announcement:
"The Fire Brigade is on the way to the 'Attention, Attention, this is a assembly area and I will report on the p drill. A fire has been detected situation as soon as I arrive on the scene." at Unit! in the EOG 102 room The Nine Mile Point Fire Brigade shall report to the Unit 1 assembly area.
All other personnel are to remain clear of the EDG 102 room area.'
- 5. Announce evacuation of EDG 102 room. SAT/ UNSAT STD: Continues on from previous announcement:
p 'This is a C02 protected area.
All personnel shall immediately evacuate the EDG 102 room and all areas adjacent to and below this location.'
- 6. Take the GAitronics system out of the Merge SAT/ UNSAT Mode STD: Takes GAitronics out of p
Cue: As the Fire Brigade Leader, report the 'Merge' using the communications console.
fire is confirmed and you request off-site fire assistance.
- 7. Notify the SM of the confirmed fire. SAT/ UNSAT p STD: Proper communicatiOons Role Play: As SM, acknowledge report of used.
confirmed fire.
- 8. Turn up volume on station radio base SAT/ UNSAT console, including Oswego County fire p frequency STD: Volume adjusted appropriately.
NRC JPM RO EP Page 6 of 8 March 2015
=::"Exelon Generation Control room actions for the CRO Firefighting Checklist are complete.
NRC JPM RO EP Page 7 of 8 March 2015
=:rExelon Generation JPM Handout Given:
- The plant is operating at approximately 100% power.
- You are the CRO.
- You have just received a report from site electricians that there is a significant fire in EDG 102 room.
- The OSC has NOT been activated.
(Operators Name), perform EPIP-EPP-28 Attachment 1, CRO Firefighting Checklist.
NRC JPM RO EP Page 8 of 8 March 2015
Training Id: 2015 NRC SRO Admin C001 Revision: 0.0
Title:
Review N1-ST-DO Daily Instrument Checks (Partial)
Approvals:
Signature I Printed Name Developed By &~Paul Isham 5/21/14 Validated By Pat O'Brien 8/19/2014 Facility Reviewer Greg Elkins 2/n/1.1 20 minutes Documentation of Performance:
Performer:
Evaluator:
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments:
Evaluators Signature: Date:
NRC JPM SRO COOl Page 1 of 8 March 2015
Exelon Generation References
- 1. Nl-ST-00, Daily Checks
- 2. Unit 1 Technical Specifications
- 3. NUREG 1123, 2.1.7 (4.7)
NRC JPM SRO C001 Page 2 of 8 March 2015
Exelon Generation Instructor Information A. JPM Information
- 1. Description
- a. This JPM tests the senior operator's ability to evaluate plant surveillance data and determine applicable tech spec actions for failed equipment.
- 2. Task Information:
- a. NS-REL-03002, Review Results of Surveillance Tests to Ensure Compliance with Specifications.
- b. K/A 2.1.7 (4.7), Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.
- 3. Evaluation /Task Criteria Perform Classroom No No Yes
- 4. Recommended Start Location
=:r-Exelon Generation
- 5. JPM Setup (if required)
- a. Provide copy of Nl-ST-DO with Attachment 4 section 6.0 and step 8.4 completed with the following values: section 6.0:
Low-Low Level Alarms - Checked "NO" Feedwater Level Column - Checked "11" E-Panel Vessel Level Indicator - 72" K-Panel Vessel Level Indicator - 72" K-Panel Flange Level Indicator - DOWNSCALE Reactor Vessel Level Recorder - 71" Wide Range Level Indicator - 7' GEMAC Level Column (Ch 11/12) - 71" I 79" GEMAC Level Computer Points (Ch 11/12) - 71.344" / 79.051" Pi Calculated GEMAC level column difference - 7.680" RPS Level Column (Ch 11/12) - 73"/76" Yarway (RPS) Level Column - 73.125"/75. 763" Pi Calculated Yarway level column difference - 2. 770" GEMAC variance - 8" Computer point variance - 7. 707" Total Recirc Flow - 38.0 Mlbm/hr Step 8.4:
Check "Pi-Calculated GEMAC Level Delta" Check "Acceptable Range"
- b. If multiple operators are going to perform the JPM at the same time, ensure each operator has a copy of Nl-ST-DO.
NRC JPM SRO COOl Page 4 of 8 March 2015
Exelon Generation B. Read Before Every JPM Performance
- 1. For the performance of this JPM, I will act as all those you need to talk to.
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated.
Repositioning of devices will be simulated by discussion and acknowledged by my cues.
- c. Read Before Each Evaluated JPM
- 1. This evaluated JPM is a measure of your ability to perform this task independently. The CRS has determined that a verifier is not available and that additional verification will not be provided.
NRC JPM SRO COOl Page 5 of 8 March 2015
Exelon Generation Given:
- The plant is operating at approximately 67% power.
- Nl-ST-DO, Daily Checks, is in progress.
- Operators have completed the RPV water level instrument readings.
Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), perform SRO review of the following section of Nl-ST-DO:
- Attachment 4 section 6.0
- Step 8.4 When completed, report findings to the Examiner.
- 1. Provide repeat back of initiating cue SAT/ UNSAT Cue: Acknowledge repeat back providing p STD: Proper communications correction if necessary. used.
- 2. Obtain a copy of the reference procedure and SAT/ UNSAT review / utilize the correct section of the p STD: N1-ST-DO Obtained procedure.
- 3. Review Attachment 4 section 6.0 readings SAT/ UNSAT and Step 8.4 p STD: Reviews Attachment 4 section 6.0 and step 8.4 readings
- 4. Identifies error in Step 8.4 PASS/ FAIL p STD: Identifies that GEMAC Level Column Variance is in the
!NOP range NRC JPM SRO C001 Page 6 of 8 March 2015
Exelon Generation If Candidate asks for prior readings for comparison, or for Engineering evaluation, report that plant data indicates GEMAC 11 is trending normally and GEMAC 12 indicates higher than expected.
- 5. Determines GEMAC 12 level indicator is p PASS/ FAIL inoperable STD: Determines GEMAC 12 level indicator is inoperable
- 6. Determines Technical Specification impact p PASS I FAIL STD: Determines a 15 day LCO applies per Technical Specification 3.1.8
- 7. Provides completed sections to Examiner and p SAT/ UNSAT informs of out of spec readings STD: Proper communications used Control room RPV water level instrument surveillance per Nl-ST-DO is reviewed. Out of spec results are identified and the appropriate Technical Specification is determined.
NRC JPM SRO COOl Page 7 of 8 March 2015
Exelon Generation JPM Handout Given:
- The plant is operating at approximately 67% power.
- Nl-ST-DO, Daily Checks, is in progress.
- Operators have completed the RPV water level instrument readings.
(Operators Name), perform SRO review of the following section of Nl-ST-DO:
- Attachment 4 section 6.0
- Step 8.4 When completed, report findings to the Examiner.
NRC JPM SRO COOl Page 8 of 8 March 2015
=::rExelon Generation Training Id: 2015 NRC RO-SRO Admin C002 Revision: 0.0
Title:
Determine Personnel Overtime Availability IAW CNG-SE-1.01-1002 Approvals:
Signature I Printed Name Developed By µ~ Pau/Isham 5/21/14 Validated By Pat O'Brien 8/19/2014 Facility Reviewer Greg Elkins z/t J Its-Approximate Duration: 20/30 minutes (RO/SRO)
Documentation of Performance:
Performer:
Evaluator:
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments:
Evaluators Signature: Date:
NRC JPM RO-SRO C002 Page 1of13 March 2015
=~Exelon Generation References
- 1. CNG-SE-1.01-1002
- 2. NUREG 1123, 2.1.5 (2.9/3.9)
NRC JPM RO-SRO C002 Page 2 of 13 March 2015
Exelon Generation Instructor Information A. JPM Information
- 1. Description
- a. This JPM tests the operator's ability to evaluate plant surveillance data and determine applicable tech spec actions for failed equipment.
- 2. Task Information:
- a. GAP-FFD02-00002, Maintain working hours within overtime guidelines.
- b. GAP-FFD02-00004, Initiate, review and approve an overtime waiver with Empcenter unavailable.
- c. K/A 2.1.5 (2.9/3.9), Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.
- 3. Evaluation /Task Criteria Perform Classroom No No Yes
- 4. Recommended Start Location
- a. Training Classroom NRC JPM RO-SRO C002 Page 3 of 13 March 2015
=:r-Exelon Generation
- 5. JPM Setup (if required)
- a. Provide copy of CNG-SE-1.01-1002.
- b. If multiple operators are going to perform the JPM at the same time, ensure each operator has a copy of CNG-SE-1.01-1002.
- c. Provide extra copies of CNG-SE-1.01-1002, attachment 1.
NRC JPM RO-SRO C002 Page 4 of 13 March 2015
Exelon Generation B. Read Before Every JPM Performance
- 1. For the performance of this JPM, I will act as all those you need to talk to.
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated.
Repositioning of devices will be simulated by discussion and acknowledged by my cues.
C. Read Before Each Evaluated JPM
- 1. This evaluated JPM is a measure of your ability to perform this task independently. The CRS has determined that a verifier is not available and that additional verification will not be provided.
NRC JPM RO-SRO C002 Page 5 of 13 March 2015
=:r-Exelon Generation Given:
- The plant is shutdown for a refueling outage.
- Current time is 2200 on November 27, 2014.
- An Operator scheduled to work the day shift on November 28, 2014 has called in sick for that shift.
- In order to support minimum control room staffing requirements, personnel overtime will be required for the day shift on November 28, 2014 from 0630-1830.
- All the overtime hours will be spent performing control room activities.
- November 14, 2014 through November 28, 2014 is a fixed 15-day period for work hour rule considerations.
- EmpCenter is NOT available.
Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operator Name),
- 1. From the provided list of personnel working hours, determine who is eligible to work a complete 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift beginning at 0630 on November 28 without exceeding the limits of CNG-SE-1.01-1002.
- 2. If a Work Hour Limits Waiver would be required for any individual(s), state the work hour limit(s) which would be exceeded IAW CNG-SE-1.01-1002.
- 1. Provide repeat back of initiating cue SAT I UNSAT p
Cue: Acknowledge repeat back providing STD: Proper communications correction if necessary. used.
- 2. Obtain a copy of the reference procedure and SAT/ UNSAT review / utilize the correct section of the p STD: CNG-SE-1.01-1002 procedure.
Obtained NRC JPM RO-SRO C002 Page 6 of 13 March 2015
Exelon Generation
- 3. Reviews work hours for Reactor Operators PASS/ FAIL
- 1 through #3 STD: Determines the following:
RO #1 - Not Eligible - Would work more than 26 hours3.009259e-4 days <br />0.00722 hours <br />4.298942e-5 weeks <br />9.893e-6 months <br /> in a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> p period OR <10 hours between shifts. (step 5.2.A.2.a)
RO #2 - Not Eligible - Would work more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in a 7 day period RO #3 - Eligible
- 4. SRO Only - Completes CNG-SE-1.01-1002 PASS I FAIL Attachment 1 Section 1 for RO #2 STD: Completes CNG-SE-1.01-1002 Attachment 1 Section 1 Cue: Give SRO additional cue sheet and for RO #2, per attached key blank CNG-SE-1.01-1002 Attachment 1 Section 1. Direct the SRO to complete CNG-SE-1.01-1002, p Attachment 1 for RO #2.
Note: Only items 1) and 2) of CNG-SE-1.01-1002 Attachment 1 Section 1 are deemed critical for evaluation of this step.
JPM Attachment B completed. For SROs, CNG-SE-1.01-1002 Attachment 1 Section 1 completed for RO #2.
NRC JPM RO-SRO C002 Page 7 of 13 March 2015
Exelon Generation RO-SRO JPM Handout Given:
- The plant is shutdown for a refueling outage.
- Current time is 2200 on November 27, 2014.
- An Operator scheduled to work the day shift on November 28, 2014 has called in sick for that shift.
- In order to support minimum control room staffing requirements, personnel overtime will be required for the day shift on November 28, 2014 from 0630-1830.
- All the overtime hours will be spent performing control room activities.
- November 14, 2014 through November 28, 2014 is a fixed 15-day period for work hour rule considerations.
- EmpCenter is NOT available.
(Operator Name),
- 1. From the provided list of personnel working hours, determine who is eligible to work a complete 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift beginning at 0630 on November 28 without exceeding the limits of CNG-SE-1.01-1002.
- 2. If a Work Hour Limits Waiver would be required for any individual(s), state the work hour limit(s) which would be exceeded IAW CNG-SE-1.01-1002.
NRC JPM RO-SRO C002 Page 8 of 13 March 2015
=::'"Exelon Generation SRO ONLY Additional JPM Handout Given:
- ROs #1 and #3 have not been able to be contacted.
- RO #2 is the only operator available and will be required to work.
(Operator Name), Complete CNG-SE-1.01-1002, Attachment 1, 10 CFR 26 Work Hour Limits Waiver, Section 1, for RO #2 to cover this shift on November 28.
NRC JPM RO-SRO C002 Page 9 of 13 March 2015
Exelon Generation Attachment A - Work Hours RO#l 11/10 11/11 11/12 11/13 11/14 11/15 11/16 11/17 11/18 11/19 11/20 11/21 11/22 11/23 11/24 11/25 11/26 11/27 11/28 0630 0630 0630 0630 0630 0630 0630 0630 0630 0630 0630 0630 OFF - - OFF OFF - - - - OFF OFF - OFF - - - - - ?
1830 1830 1830 1830 1830 2030 1830 1830 1830 1830 1530 2130 R0#2 11/10 11/11 11/12 11/13 11/14 11/15 11/16 11/17 11/18 11/19 11/20 11/21 11/22 11/23 11/24 11/25 11/26 11/27 11/28 0630 0730 0630 0630 0630 0630 0630 0630 0630 0630 0630 0630 0630 OFF - - OFF OFF - - - - - OFF OFF - - - - - - ?
2130 1730 1830 1830 1830 2030 1830 1830 1830 1830 1830 1830 1830 R0#3 11/10 11/11 11/12 11/13 11/14 11/15 11/16 11/17 11/18 11/19 11/20 11/21 11/22 11/23 11/24 11/25 11/26 11/27 11/28 0630 0630 0630 0630 0630 0630 0630 0630 0630 0630 0630 0630
- - OFF - OFF OFF - - - - - OFF OFF - - - - OFF ?
1830 1830 1830 1830 1830 1630 2030 1830 1830 2030 1830 1830 NRC JPM RO-SRO C002 Page 10 of 13 March 2015
Exelon Generation Attachment B - Answer Sheet Eligible to work without a If No, what work hour Work Hour Limits Waiver? limit(s) would be exceeded (Yes/No)
IAW CNG-SE-1.01-1002?
RO #1 RO #2 RO #3 NRC JPM RO-SRO C002 Page 11of13 March 2015
Exelon Generation Training Id: 2015 NRC RO-SRO Admin EC Revision: 0.0
Title:
Perform Daily Thermal Limit Surveillance Approvals:
ature Printed Name 7~/~~**
Developed By .r.,,,,, r ~ Paul Isham 5/21/14 Validated By Pat O'Brien 8/19/14 Facility Reviewer Approximate Duration: 20 minutes Documentation of Performance:
Performer:
Evaluator:
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments:
Evaluators Signature: Date:
NRC JPM RO-SRO EC Page 1 of 8 March 2015
Exelon Generation References
- 1. Nl-RESP-lA, Daily Thermal Limit Surveillance Short Form
- 2. 30 Monicore
- 3. NU REG 1123, 2.2.12 (3. 7/4.1)
NRC JPM RO-SRO EC Page 2 of 8 March 2015
Exelon Generation Instructor Information A. JPM Information
- 1. Description
- a. This JPM tests the operator's ability to evaluate plant thermal limits in accordance with surveillance requirements.
- 2. Task Information:
- a. NS-REL-03002, Review Results of Surveillance Tests to Ensure Compliance with Specifications.
- b. K/A 2.2.12 (3. 7/4.1), Knowledge of Surveillance Procedures.
- 3. Evaluation/ Task Criteria Perform Classroom No No Yes
- 4. Recommended Start Location
- a. Training Classroom
- 5. JPM Setup (if required)
- a. Provide two 30 Monicore cases ("today's" and "yesterday's"). Yesterday's case should be normal. Today's case should have MFLCPR edited to be above 1.0 with MCPR edited accordingly.
- b. Provide enough copies of Nl-RESP-lA completed up to section 8.2.2.
=~Exelon Generation B. Read Before Every JPM Performance
- 1. For the performance of this JPM, I will act as all those you need to talk to.
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated.
Repositioning of devices will be simulated by discussion and acknowledged by my cues.
C. Read Before Each Evaluated JPM
- 1. This evaluated JPM is a measure of your ability to perform this task independently. The CRS has determined that a verifier is not available and that additional verification will not be provided.
NRC JPM RO-SRO EC Page 4 of 8 March 2015
Exelon Generation Given:
- The plant is operating at approximately 100% power with 5 Recirculation pumps in service.
- No change in power or control rod position has occurred since the current 30 Monicore case was generated.
- The following data is provided:
Computer Point A-390 reads 354°F Computer Point A-392 reads 352°F LEFM Flow correction factor process computer point J385 reads 0. 9990 LEFM Flow correction factor process computer point J386 reads 0. 9907 LEFM Flow correction factor from CRC Book - West = O. 9990 LEFM Flow correction factor from CRC Book - East= 0.9907 Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), perform the Daily Thermal Limit Surveillance in accordance with N1-RESP-1A, section 8.2.
- 1. Provide repeat back of initiating cue SAT/ UNSAT Cue: Acknowledge repeat back providing p STD: Proper communications correction if necessary. used.
- 2. Obtain a copy of the reference procedure and SAT/ UNSAT review / utilize the correct section of the p STD: N1-RESP-1A and 30 procedure.
Monicore cases obtained Provide copies of N1-RESP-1A and 30 monicore case edits (current and previous day). Only provide N1-0P-16, attachment 4 if requested.
NRC JPM RO-SRO EC Page 5 of 8 March 2015
Exelon Generation
- 3. Complete Nl-RESP-lA section 8.2 PASS/ FAIL Note: Refer to KEY for completed STD: Nl-RESP-lA completed per the key surveillance. The items circled in blue are the critical steps (8.2.5, 8.2.6, 8.2.7, and 8.2.9). p Role Play: If asked how to proceed at step 8.2.6 with MFLCPR above 1.0, acknowledge condition and direct the Candidate to complete the rest of section 8.2.
- 4. Identify discrepancy in Nl-RESP-lA section PASS/ FAIL 8.2 STD: Identifies that SRO Only Cue: Once the SRO Candidate p MFLCPR/MCPR have exceeded has identified MFLCPR/MCPR violation, direct the limit them to determine the required action for this condition.
- 5. SRO Only - Determine required action for p PASS/ FAIL MFLCPR/MCPR violation STD: Determines Technical Specification 3.1. 7 .c is not met.
p PASS/ FAIL STD: Determines action shall be initiated within 15 minutes to restore operation to within the prescribed limit. If all the operating MCPRs are not returned to within the prescribed limit within two (2) hours, reactor power reductions shall be initiated at a rate not less than 10% per hour until MCPR is within the prescribed limit.
NRC JPM RO-SRO EC Page 6 of 8 March 2015
=:rExelon Generation Daily thermal limit surveillance completed in accordance with N1-RESP-1A section 8.2, with all discrepancies identified. For SRO Candidates, required actions identified.
NRC JPM RO-SRO EC Page 7 of 8 March 2015
Exelon Generation JPM Handout Given:
- The plant is operating at approximately 100% power with 5 Recirculation pumps in service.
- No change in power or control rod position has occurred since the current 3D Monicore case was generated.
- The following data is provided:
Computer Point A-390 reads 354°F Computer Point A-392 reads 352°F LEFM Flow correction factor process computer point J385 reads 0.9990 LEFM Flow correction factor process computer point J386 reads 0.9907 LEFM Flow correction factor from CRC Book - West = 0.9990 LEFM Flow correction factor from CRC Book - East = 0. 9907 (Operators Name), perform the Daily Thermal Limit Surveillance in accordance with N1-RESP-1A, section 8.2.
NRC JPM RO-SRO EC Page 8 of 8 March 2015
Exelon Generation Training Id: 2015 NRC SRO Admin RC Revision: 0.0 Determine Radiation Controls - Emergency Exposure for Local MSIV
Title:
Closure Approvals:
Developed By Paul Isham 5/21/14 Validated By Pat O'Brien 8/19/2014 Facility Reviewer Greg Elkins z/;7 ft-Approximate Duration: 20 minutes Documentation of Performance:
Performer:
Evaluator:
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments:
Evaluators Signature: Date:
NRC JPM SRO RC Page 1of10 March 2015
=~Exelon Generation References
- 1. GAP-RPP-07, Internal and External Dosimetry Program
- 2. S-RAP-RPP-0703, Authorization to Exceed Administrative Dose Limits
- 3. CNG-EP-1.01-1014, Emergency Exposures and KI
- 4. NUREG 1123, 2.3.4 (3.7)
NRC JPM SRO RC Page 2 of 10 March 2015
=~Exelon Generation Instructor Information A. JPM Information
- 1. Description
- a. This JPM is used to test generic knowledge in calculation of overall dose and control mechanisms to allow the selection of individuals to continue or perform work in high dose areas. This JPM tests basic mathematics and understanding of stay times and remaining dose limitations under normal operating conditions given normal quarterly dose limitations.
- 2. Task Information:
- a. GAP-RPP07-00002, Comply with administrative exposure limits
- b. K/A 2.3.4 (3.7), Knowledge of radiation exposure limits under normal or emergency conditions.
- 3. Evaluation/ Task Criteria Perform Classroom No No Yes
- 4. Recommended Start Location
Exelon Generation
- 5. JPM Setup (if required)
- a. Ensure sufficient copies of the following procedures are available in the exam area:
- GAP-RPP-07
- S-RAP-RPP-0703
- CNG-EP-1.01-1014
- EP-Form-ALL08 (2 per applicant)
NRC JPM SRO RC Page 4 of 10 March 2015
Exelon Generation B. Read Before Every JPM Performance
- 1. For the performance of this JPM, I will act as all those you need to talk to.
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated.
Repositioning of devices will be simulated by discussion and acknowledged by my cues.
- c. Read Before Each Evaluated JPM
- 1. This evaluated JPM is a measure of your ability to perform this task independently. The CRS has determined that a verifier is not available and that additional verification will not be provided.
NRC JPM SRO RC Page 5 of 10 March 2015
Exelon Generation Given:
- The plant is at 15% power.
- A Site Area Emergency has been declared due to a steam line rupture with significant fuel damage.
- Job conditions are as follows:
o Two individuals are required to complete the job.
o Each worker is expected to receive 575 mR in transit to the Main Steam line access door AND the same amount again while exiting the plant.
o Each worker is expected to spend 2 minutes in an 800 mR/hr field in transit from the Main Steam line access door to the job site.
o The job site is against the outer Containment Wall in a 1.9 R/hr field.
o The job will take 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at the job site with both workers working the full time.
o Each worker is expected to spend 3 minutes in an 800 mR/hr field in transit from the job site to the Main Steam line access door.
- Two workers are briefed to complete the task.
o Technician 1 - John Technician - Maintenance - SS # 123 6789 - TLD # 145678 o Technician 2 - James Worker - Operations - SS# 987-65-4321
- TLD# 235699
- During an initial entry under a modified RWP the workers received the following dose:
o Technician 1 received 900 mR on his Electronic Dosimeter from his first entry, resulting in a total exposure of 1678 mR for the year.
o Technician 2 received 600 mR on his Electronic Dosimeter from his first entry, resulting in a total exposure of 1399 mR for the year.
- The TSC has not been staffed and the RAC is in route to the site.
- Emergency exposure controls have not been implemented.
Evaluator: Ask trainee if he/she has any questions a~er presenting initial conditions (Operators Name), Anticipate dose to be accumulated by each worker.
Authorize work using the appropriate exposure limits to allow completion of the required task per CNG-EP-1.01-1014 and GAP-RPP-07.
NRC JPM SRO RC Page 6 of 10 March 2015
Exelon Generation
- 1. Provide repeat back of initiating cue SAT/ UNSAT p
Cue: Acknowledge repeat back providing STD: Proper communications correction if necessary. used.
- 2. Obtain a copy of the reference procedure and SAT I UNSAT review/ utilize the correct section of the p procedure. STD: CNG-EP-1.01-1014 and GAP-RPP-07 Obtained
- 3. For each worker:
3a Determine anticipated dose from task SAT I UNSAT performance in the work area.
p STD:
Dose Rate *Time= Task Dose 1900 mR/hr
- 2hr = 3800 mR 3b Determine anticipated dose from transit to p SAT I UNSAT and from the Main Steam chase STD:
2 x Transit dose (To and From) 2*575mR = 1150mR 3c Determine anticipated dose from transit to p SAT I UNSAT the work area in the steam chase.
STD:
Dose Rate *Time=Transit Dose 800mR/hr* (2min/60)=26. 7mR 3d Determine anticipated dose from transit from p SAT/ UNSAT the work area in the steam chase. STD:
Dose Rate *Time=Transit Dose 800mR/hr * (3min/60)=40mR 3e Determine the total dose for each worker p PASS/ FAIL from 3a through 3d. STD:
Add 3a-3d = 5016.7mR NRC JPM SRO RC Page 7 of 10 March 2015
=;:r Exelon Generation
- 4. Determine that task performance is not p SAT I UNSAT allowable per normal controls. STD: Determines that total dose is greater than the annual 4000 mR administrative limit for radiation exposure per GAP-RPP-07 and the 5000 mR federal limit
- 5. Determines that emergency exposure PASS/ FAIL controls are required per CNG-EP-1.01-1014, STD: Evaluates the total expected dose and recognizes step 5.1.A p that emergency exposure controls are required to raise the limit above 5 R for each individual per CNG-EP-1.01-1014
- 6. Verifies workers are allowed to receive p SAT/ UNSAT emergency exposure per step 5.1.C STD: Using currently identified workers verifies workers:
are not declared pregnant workers Cue: If asked, neither worker meets any of have not received a the exclusion criteria. previous emergency exposure have not received a planned special exposure.
- 7. Determines EP-Form-All08 is required per p PASS/ FAIL step 5.1.E. STD: Determines EP-Form-All08 is required due to anticipated exposure >SR Cue: When the applicant determines EP-Form-All08 is required, provide the form.
- 8. Completes EP-Form-All08 for technician 1. p PASS/ FAIL STD: Completes section A of Note: Acceptable range of authorized EP-Form-All08 for technician 1.
exposure: Anywhere between 5.016Rem to 25 Rem with be accepted for full credit.
Employer is not a critical component of this step.
NRC JPM SRO RC Page 8 of 10 March 2015
=:r-Exelon Generation
- 9. Completes EP-Form-All08 for technician 2. p PASS/ FAIL STD: Completes section A of Note: Acceptable range of authorized EP-Form-AllOS for technician 2.
exposure: Anywhere between 5.016Rem to 25 Rem with be accepted for full credit.
Employer is not a critical component of this step.
"You may stop here, you have met the termination criteria for this JPM" NRC JPM SRO RC Page 9 of 10 March 2015
Exelon Generation JPM Handout Given:
- The plant is at 15% power.
- A Site Area Emergency has been declared due to a steam line rupture with significant fuel damage.
- Job conditions are as follows:
o Two individuals are required to complete the job.
o Each worker is expected to receive 575 mR in transit to the Main Steam line access door AND the same amount again while exiting the plant.
o Each worker is expected to spend 2 minutes in an 800 mR/hr field in transit from the Main Steam line access door to the job site.
o The job site is against the outer Containment Wall in a 1.9 R/hr field.
o The job will take 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at the job site with both workers working the full time.
o Each worker is expected to spend 3 minutes in an 800 mR/hr field in transit from the job site to the Main Steam line access door.
- Two workers are briefed to complete the task.
o Technician 1 - John Technician - Maintenance - SS # 123 6789 - TLD # 145678 o Technician 2 - James Worker - Operations - SS# 987-65-4321
- TLD# 235699
- During an initial entry under a modified RWP the workers received the following dose:
o Technician 1 received 900 mR on his Electronic Dosimeter from his first entry, resulting in a total exposure of 1678 mR for the year.
o Technician 2 received 600 mR on his Electronic Dosimeter from his first entry, resulting in a total exposure of 1399 mR for the year.
- The TSC has not been staffed and the RAC is in route to the site.
- Emergency exposure controls have not been implemented.
(Operators Name), Anticipate dose to be accumulated by each worker.
Authorize work using the appropriate exposure limits to allow completion of the required task per CNG-EP-1.01-1014 and GAP-RPP-07.
NRC JPM SRO RC Page 10 of 10 March 2015
_.,, Exelon Generation Training Id: 2015 NRC SRO Admin EP Revision: 0.0
Title:
Classify Emergency Event and Perform Initial Notifications Approvals:
Si Developed By 5/21/14 Validated By Pat O'Brien 8/19/2014 Facility Reviewer Greg Elkins b/11 la Approximate Duration: 20 minutes Documentation of Performance:
Performer:
Evaluator:
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments:
Evaluators Signature: Date:
NRC JPM SRO EP Page 1of9 March 2015
~* Exelon Generation References
- 1. NUREG 1123, 2.4.41 (4.6)
- 2. EPIP-EPP-01 EAL Matrix
- 3. CNG-EP-1.01-1013, Emergency Classification and PAR
- 4. CNG-EP-1.01-1015, Emergency Notifications
- 5. CNG-EP-1.01-1019, Site Emergency Operations
- 6. EPMP-EPP-0101, Unit 1 Emergency Classification Technical Bases NRC JPM SRO EP Page 2 of 9 March 2015
=:r-Exelon Generation Instructor Information A. JPM Information
- 1. Description
- a. This JPM tests the senior operator's knowledge of emergency action thresholds by giving a series of plant conditions and requiring the operator to classify the event and complete a part 1 notification.
- 2. Task Information:
- a. NS-EPlOl-03005, Classify emergency events requiring emergency plan implementation.
- b. K/A 2.4.41 (4.6), Knowledge of emergency action level thresholds and classifications.
- 3. Evaluation /Task Criteria Perform Classroom Yes No Yes
- 4. Recommended Start Location
- a. Training Classroom
- 5. JPM Setup (if required)
- a. Provide copy of EPIP-EPP-01, UNIT 1 EAL MATRIX
- b. Ensure sufficient copies of the SM/ED checklist packages are available.
NRC JPM SRO EP Page 3 of 9 March 2015
Exelon Generation B. Read Before Every JPM Performance
- 1. For the performance of this JPM, I will act as all those you need to talk to.
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated.
Repositioning of devices will be simulated by discussion and acknowledged by my cues.
C. Read Before Each Evaluated JPM
- 1. This evaluated JPM is a measure of your ability to perform this task independently. The CRS has determined that a verifier is not available and that additional verification will not be provided.
NRC JPM SRO EP Page 4 of 9 March 2015
Exelon Generation Given:
- 1. You are the Unit 1 Shift Manager.
- 2. Unit 1 was operating at 100% power.
- 3. Unit 2 is operating at 100% power.
- 4. The following events have occurred at Unit 1:
- EDG 103 was removed from service for corrective maintenance and will not be available for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- A loss of both offsite power lines has occurred.
- EDG 102 automatically started and supplied Powerboard 102
- Power control estimates several hours until an offsite power line can be restored.
- The ERO has not been activated.
- Unit 1 is currently still in an operating condition.
Instructor / Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), based on the above conditions, determine the event classification per CNG-EP-1.01-1013 and complete steps 1 through 1.3.2.A of EP-Chlst-MCROl, Shift Manager Checklist. This is a time critical task.
Time starts now.
- ~.:~,1/~:~;:,~,F~f~*'.*** .."ACr*CODE'"
. : ;;>pt~t'NA. .
,s~ -
- 1. Provide repeat back of initiating cue SAT/ UNSAT p
Cue: Acknowledge repeat back providing STD: Proper communications correction if necessary. used.
- 2. Obtain a copy of the reference procedure and SAT I UNSAT review / utilize the correct section of the STD: Shift Manager ERO forms procedure.
obtained. EAL Flowchart p
obtained.
Note: Each SRO applicant will be provided with a partial Shift Manager ERO Guidebook and a copy of the EAL Flowchart.
NRC JPM SRO EP Page 5 of 9 March 2015
Exelon Generation ACT. CODE***
P IS:l i-4Jt' .*
- 3. Print name and date on Shift Manager SAT/ UNSAT Checklist.
(step 1.1.2) STD: Step 1.1.2 complete with applicant name and date.
- 4. Call the Shift Communicator and Dose SAT/ UNSAT Assessors to the Control Rooms. p (step 1.1.3) STD: Proper communications used
- 5. If entry is due to a security event, the p SAT I UNSAT concurrently perform the station specific procedure. STD: Determine there is no indication of a security threat.
- 6. Using CNG-EP-1.01-1013, classify the event. PASS I FAIL (step 1.2.2)
STD: Determines Alert, SA1 .1 due to:
Note: The classification, NOT the use of the
- AC power capability to 4.16 references provided in the standard, is used kV emergency buses p reduced to a single power for the pass/fail grading criteria.
source for > 15 min.
AND Cue: If applicant requests a peer check,
- ANY additional single respond that peer checks are not available. power source failure will result in a loss of all 4.16 kV emergency bus power.
- 7. Declare the event by announcing, "I am p PASS/ FAIL declaring an Alert, EAL SAl.1, at (time) due to only having 1 power source available to STD: Event declared in the control room. Declaration the emergency 4160V powerboards, and occurred within 15 minutes of assuming the role as Emergency Director." JPM start time.
Notes: Similar announcements are JPM Start Time_ _ __
acceptable provided all the information listed in step 1.2.2.B is announced. Declaration time_ _ __
The time difference must be 15 minutes or less.
NRC JPM SRO EP Page 6 of 9 March 2015
=~Exelon Generation
- 8. Determine if protective actions for onsite p SAT I UNSAT personnel are necessary using EP-Form-ALL12, Onsite Protective Measures Flowchart STD: Determine there is no need to perform protected area (step 1.2.3) evacuation and accountability.
Note: EP-Form-ALL12 will advise to "Consider" implementing protected area evacuation, but does not require it.
- 9. Announce or direct PA announcements, for p PASS I FAIL station personnel as necessary using EP-Form-ALL36. STD: Completes EP-Form-ALL36 per the attached key (step 1.2.4) with step (3) being the only critical step.
Cue: When EP-Form-ALL36 is completed, inform the applicant another operator will make the PA announcement.
- 10. Determine appropriate PAR per CNG-EP- SAT/ UNSAT 1.01-1013, Emergency Classification and PAR. STD: Determine no PARs for the Alert condition.
(step 1.2.5)
- 11. Complete ERONS notification Details Form, SAT I UNSAT EP-Form-ALL28 (step 1. 3 . 1 ) STD: Completes EP-Form-ALL28 per the attached key.
Cue: When EP-Form-ALL28 is completed, inform the applicant the Shift Communicator with inform the ERO.
NRC JPM SRO EP Page 7 of 9 March 2015
Exelon Generation
~~~~!f.'rOtt
)'."*
P/ srNA'
- 12. Complete station specific initial notification PASS/ FAIL form (Part 1)
(step 1.3.2) STD: Completes EP-Form-ALL31 per the attached key with steps (3), (4), (5), (6),
and (7)being the only critical steps.
Declaration time_ _ __
Note: The time difference must be 15 minutes or less.
Part 1 Notification Fact Sheet is complete: _ __
Your task is complete.
Alert is declared and Part 1 notification is complete.
NRC JPM SRO EP Page 8 of 9 March 2015
Exelon Generation JPM Handout Given:
- 1. You are the Unit 1 Shift Manager.
- 2. Unit 1 was operating at 100% power.
- 3. Unit 2 is operating at 100% power.
- 4. The following events have occurred at Unit 1:
- EOG 103 was removed from service for corrective maintenance and will not be available for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- A loss of both offsite power lines has occurred.
- EOG 102 automatically started and supplied Powerboard 102
- Power control estimates several hours until an offsite power line can be restored.
- The ERO has not been activated.
- Unit 1 is currently still in an operating condition.
{Operators Name), based on the above conditions, determine the event classification per CNG-EP-1.01-1013 and complete steps 1 through 1.3.2.A of EP-ChLst-MCROl, Shift Manager Checklist. This is a time critical task.
Time starts now.
Emergency Meteorology Report Last 15 Minute Emergency Meteorology Report Data Data from Nine Mile Point Met System Date: XX/XX/XXXX Time (Local): XX:XX:XX Elevated Ground 200' Wind Speed (Main) 40 (mph) 30' Wind Speed (Main) 35 (mph) 200' Wind Dir From (Main) 45 (deg) 30' Wind Dir From (Main) 60 (deg) 200' Delta Temperature -1.56 (deg F) 100' Delta Temperature -0.81 (deg F)
Stability Class D Stability Class D 30' Air Temperature 80 (deg F) Precipitation (15 min) 0 (in)
NRC JPM SRO EP Page 9 of 9 March 2015
=::'"Exelon Generation Training Id: 2015 NRC JPM S-1 Revision: -0.0
Title:
Place 11 Shutdown Cooling Loop in Service (Alternate Path)
Approvals:
Signature I Printed Name Developed By ~~ Paul Isham 03/17/14 Validated By Leigh Mason 8/20/14 Facility Reviewer Greg Elkins Approximate Duration: 15 minutes Documentation of Performance:
Performer:
Evaluator:
Start Time: Stop Time: Completion Time Grade: Pass I Fail Comments:
Evaluators Signature: Date:
NRC 2015 JPM 5-1 Page 1of13 March 2015
References
- 1. Nl-OP-4, Shutdown Cooling System
- 2. NUREG 1123 K/A 205000, A4.01, (3.7/3.7)
NRC 2015 JPM S-1 Page 2 of 13 March 2015
=~Exelon Generationoo Instructor Information A. JPM Information
- 1. Description
- a. This JPM tests the operator's ability to operate the SDC system. The operator will attempt to put SDC system 11 in service.
- b. This JPM is considered alternate path because shortly after a SDC pump is started, it will trip. The operator will be expected to make a recommendation to place 12 SDC loop in service.
- 2. Task Information:
- a. Nl-205000-01002
- b. K/A 205000, A4.01, (3.7/3.7)
- 3. Evaluation/ Task Criteria Perform Simulator No Yes Yes
- 4. Recommended Start Location
=:rExelon Generation
- 5. Simulator Setup (if required)
- a. Initialize Simulator to IC-161.
- b. Verify SOC temperature recorder on.
- c. Update 70-49, 70-54, and 70-58 status to "4".
- d. Verify recirc suction temperature is displayed (computer point A427).
- g. Verify SOC 13 suction valve is yellow tagged (38-05)
- h. Verify Malfunction SCOlC inserted
- i. Verify Malfunction SCOlA on TRG 1 with 60 second TD
- j. Verify TRG 1 condition is "ZDSCPSTR(l)==l"
- k. Verify the following remotes are preset:
- SCOl = close
- SC02 = installed
- SC03 = close I. Verify remotes SC04A(B)(C) = 100% are preset.
- 6. JPM Setup (if required)
- a. Nl-OP-4, E.3.1 marked complete.
B. Read Before Every JPM Performance
- 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
C. Read Before Each Evaluated JPM
- 1. This evaluated JPM is a measure of your ability to perform this task independently.
The CRS has determined that a verifier is not available and that additional verification will not be provided.
NRC 2015 JPM S-1 Page 4 of 13 March 2015
=~Exelon Generation Given:
- The Reactor is shutdown with all rods in.
- Reactor pressure is less than 120 psig.
- Nl-OP-4 has been completed through step E.3.1 for placing Shutdown Cooling in service.
- Shutdown Cooling has been filled and vented within the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and does not require further filling or venting.
- Shutdown Cooling IV fuses/breakers have been installed.
- Reactor water level is being monitored by another operator.
Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), place Shutdown Cooling loop 11 in service per Nl-OP-4 starting at step E.3.2.
- 1. Provide repeat back of initiating cue SAT I UNSAT STD: Proper p
Cue: Acknowledge repeat back providing communications used correction if necessary
- 2. Obtain a copy of the reference procedure and SAT/ UNSAT review / utilize the correct section of the procedure p STD: Nl-OP-4 obtained, precautions & limitations reviewed, & section E.3.0 referenced
- 3. Open the following valves: (Step 3.2)
NRC 2015 JPM S-1 Page 5 of 13 March 2015
=~Exelon Generation 3a. 38-03, SDC VALVE 11 PUMP SUCTION PASS/ FAIL (Step E.3.2) p STD: Opens 38-03 by rotating control switch CW to OPEN 3b. 38-04, SDC VALVE 12 PUMP SUCTION PASS/ FAIL (Step E.3.2) p STD: Opens 38-04 by rotating control switch CW to OPEN 3c. 38-05, SDC VALVE 13 PUMP SUCTION SAT I UNSAT Note: Candidate may request a Technical STD: Recognizes 38-05 Procedure Step Deletion be processed before is tagged closed proceeding. p Cue: If Technical Procedure Step Deletion is requested, inform the Operator that the step has been deleted and to proceed.
- 4. Fill AND vent the SDC System by performing SAT/ UNSAT the following: (Step 3.3) p STD: Determines fill and vent not required due to initial conditions
- 5. Verify all rods inserted UNLESS directed by SAT/ UNSAT EOPs (Step 3.4)
STD: Determines all rods p
are inserted per initial conditions or simulator setup NRC 2015 JPM S-1 Page 6 of 13 March 2015
Exelon Generatione<
- 6. IF SDC IV fuses AND breakers have NOT SAT/ UNSAT been installed, THEN perform the following:
(Step 3.5) STD: Determines SDC IV p fuses and breakers have been installed per initial conditions or simulator setup
- 7. Open IV-38-02, SDC SYSTEM IN IV 12 PASS/ FAIL (OUTSIDE) (Step 3.6) p STD: Opens 38-02 by rotating control switch CW to OPEN
- 8. WHEN Reactor pressure is less than 120 SAT I UNSAT psig, un-isolate Shutdown Cooling System as follows: (Step 3. 7) p STD: Determines Reactor pressure is less than 120 psig per initial conditions or simulator setup 8a Monitor Reactor vessel level SAT/ UNSAT (Step 3.7.1) p STD: Determines another operator is monitoring Reactor water level per initial conditions 8b IF Reactor vessel level begins to go down SAT/ UNSAT WHILE un-isolating Shutdown Cooling System, THEN isolate Shutdown Cooling p STD: Determines Reactor System AND determine cause of reduction in water level is stable in Reactor Vessel level subsequent steps 8c Open 38-13, SDC SYSTEM OUT IV 1 PASS/ FAIL (INSIDE) (Step 3. 7 .3) p STD: Opens 38-13 by rotating control switch CW to OPEN NRC 2015 JPM S-1 Page 7 of 13 March 2015
=~Exelon Generation 8d Open 38-01, SDC SYTEM IN IV 11 (INSIDE) PASS/ FAIL (Step 3.7.4) p STD: Opens 38-01 by rotating control switch CW to OPEN
- 9. Vent Shutdown Cooling pumps using the SAT/ UNSAT following valves: (step 3.8) p STD: Determines venting not required due to initial conditions
- 10. Vent heat exchangers using the following SAT I UNSAT valves: (Step 3.9) p STD: Determines venting not required due to initial conditions
- 11. Verify open the following valves: SAT I UNSAT (Step 3.10)
STD: Observes green
- 38-134, SDC PUMP RECIRC VALVE 11 light off, red light on for all
- 38-131, SDC PUMP RECIRC VALVE 12
- 38-128, SDC PUMP RECIRC VALVE 13 Note: Candidate may disregard 38-128 because the associated pump is tagged out.
- 12. Start 11 SDC Pump as follows:
(Step 3.11)
Note: Pump Seal was NOT discovered de-staged (Step 3.11.1)
NRC 2015 JPM S-1 Page 8 of 13 March 2015
Exelon Generation 12a Verify SD COOLING TCV 11 manual controller SAT/ UNSAT selected for zero output demand (Step 3.11.2) p STD: Observes SD COOLING TCV 11 manual controller selected for zero output demand 12b Using local indication, verify closed FCV SAT/ UNSAT 09, SDC 11 FCV (step 3.11.2.b) p STD: Dispatches Role Play: Acknowledge direction and operator to verify closed report the appropriate loop FCV is closed. FCV-38-09 Role Plays: For each of these dPIS steps, acknowledge direction and then report the appropriate valve position. Candidate may just provide direction to perform actions by procedure step number.
12c Verify closed Gl, Instrument HP Blocking SAT I UNSAT Valve - SDC Loop 11 (step 3.11.2.c) p STD: Dispatches operator to verify closed Gl 12d Verify open G3, Instrument Equalizing Valve SAT/ UNSAT
- SDC Loop 11 (step 3.11.2.d) p STD: Dispatches operator to verify open G3 12e Verify closed G2, Instrument LP Blocking SAT/ UNSAT Valve - SDC Loop 11 (step 3.11.2.e) p STD: Dispatches operator to verify closed G2 12f Place 11 SDC Pump Control Switch in START PASS/ FAIL UNTIL 11 SDC PUMP running light is lit (step 3.11.2.f) p STD: Starts SDC pump 11 by rotating control switch CW to START NRC 2015 JPM S-1 Page 9 of 13 March 2015
=~Exelon Generation 12g Open G2, Instrument LP Blocking Valve - SAT/ UNSAT SDC Loop 11 p (step 3.11.2.g) STD: Dispatches operator to open G2 12h Close G3, Instrument Equalizing Valve - SDC SAT/ UNSAT Loop 11 p (step 3.11.2.h) STD: Dispatches operator to close G3 12i Open Gl, Instrument HP Blocking Valve - SAT/ UNSAT SDC Loop 11 p (step 3.11.2.i) STD: Dispatches operator to open Gl
STD: Opens 38-09 by
- 38-09, SD COOLING TCV 11 rotating knurled knob CW NOTE: 1 minute after 11 SDC pump in p service, verify tripped 11 SDC pump (event Note: Step may be NA if trigger). Alarm K3-1-1, SDC Pump 11 trip, pump trips prior to comes in on the pump trip. The alarm executing.
response procedure gives direction to start another pump.
Cue: If applicant does not make a recommendation to place another SDC pump in service, ask "What would you recommend?".
Role Play: If candidate asks about normalizing SDC loop 11, tell them to leave SDC loop 11 as is.
NRC 2015 JPM S-1 Page 10 of 13 March 2015
=~Exelon Generation
- 14. Start 12 SDC Pump as follows:
(Step 3.11)
Note: Pump Seal was NOT discovered de-staged (Step 3.11.1) 14a Verify SD COOLING TCV 12 manual controller SAT/ UNSAT selected for zero output demand STD: Observes SD p
COOLING TCV 12 manual controller selected for zero output demand 14b Using local indication, verify closed FCV SAT I UNSAT 10, SOC 12 FCV p STD: Dispatches Role Play: Acknowledge direction and operator to verify closed report the appropriate loop FCV is closed. FCV-38-10 Role Plays: When directed to operate valves in steps 3.11.2.1, m, and n, report the valves have been repositioned as directed.
14c Place 12 SDC Pump Control Switch in START PASS/ FAIL UNTIL 12 SOC PUMP running light is lit (Step 3.11.2.o) p STD: Starts SOC pump 12 by rotating control switch CW to START Role Plays: When directed to operate valves in steps 3.11.2.p, q, and r, report the valves have been repositioned as directed.
p STD: Opens 38-10 by 38-10, SD COOLING TCV 12 rotating knurled knob CW (step 3.11.3)
NRC 2015 JPM S-1 Page 11of13 March 2015
Exelon Generation
- 16. If reactor water flashing occurs in SDC SAT I UNSAT System, reduce reactor water flow via selected SDC cooling TCV and maximize STD: Pump amp p
RBCLC cooling water flow. indicator observed as steady.
Cue: No flashing observed.
STD: Rotate knob on NOTE: Operator will monitor temperatures controller 38-10 CW or on panel recorder. CCW as required for a gradual warmup as NOTE: Operator may choose not to make p indicated on 38-136B.
any further adjustments based on the rate at which the loop is warming up with 38-10 10% open.
Cue: Tell operator no further adjustments in the system are required.
Cue: Acknowledge report Cue: Your task is complete.
Shutdown Cooling Loop 12 placed in service.
NRC 2015 JPM S-1 Page 12 of 13 March 2015
~* Exelon Generation JPM Handout Given:
- The Reactor is shutdown with all rods in.
- Reactor pressure is less than 120 psig.
- Nl-OP-4 has been completed through step E.3.1 for placing Shutdown Cooling in service.
- Shutdown Cooling has been filled and vented within the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and does not require further filling or venting.
- Shutdown Cooling IV fuses/breakers have been installed.
- Reactor water level is being monitored by another operator.
Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), place Shutdown Cooling loop 11 in service per Nl-OP-4 starting at step E.3.2.
NRC 2015 JPM S-1 Page 13 of 13 March 2015
=~Exelon Generation Training Id: 2015 NRC JPM S-2 Revision: 0.0
Title:
Vent the Drywell Prior to Personnel Entry <212F Per Nl-OP-9 Approvals:
~_aJ:ure I Printed Name Developed By ~/~~aullsham 03/17/14 Validated By Pat O'Brien 8/20/14 Facility Reviewer Approximate Duration: 15 minutes Documentation of Performance:
Performer:
Evaluator:
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments:
Evaluators Signature: Date:
NRC 2015 JPM S-2 Page 1of9 March 2015
- Exelon Generation References
- 1. Nl-OP-9, N2 Inerting and H2-02 Monitoring Systems
- 2. NUREG 1123 K/A 223001, A4.03, (3.4/3.4)
NRC 2015 JPM S-2 Page 2 of 9 March 2015
Exelon Generation Instructor Information A. JPM Information
- 1. Description
- a. This JPM tests the operator's ability to locate and operate containment air dilution valves for inerting and de-inerting the containment. The operator will vent the drywell with the reactor <212F.
- b. This JPM is NOT considered alternate path.
- 2. Task Information:
- a. Nl-223003-01004
- b. K/A 223001, A4.03, (3.4/3.4)
- 3. Evaluation/ Task Criteria Perform Simulator No No Yes
- 4. Recommended Start Location
~* Exelon Generation~
- 5. Simulator Setup (if required)
- a. The reactor is in a shutdown condition.
- b. Initialize simulator to IC-161.
- c. Verify remote PCOS is inserted with valves open.
- d. Verify some positive pressure in the drywell.
- 6. JPM Setup (if required)
- a. Nl-OP-9 marked up through G.2.6.2.
B. Read Before Every JPM Performance
- 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
- c. Read Before Each Evaluated JPM
- 1. This evaluated JPM is a measure of your ability to perform this task independently.
The CRS has determined that a verifier is not available and that additional verification will not be provided.
NRC 2015 JPM S-2 Page 4 of 9 March 2015
_..,, Exelon Generation Given:
- The plant is shutdown, <212°F.
- The Operations Manager has determined a complete de-inert to 19.5% Oxygen is necessary.
- Nl-OP-9 is completed through Step G.2.6.2.
Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), vent the Drywell in accordance with Nl-OP-9, starting at step G.2.6.3. Secure venting when Drywell pressure is below 0 psig.
- 1. Provide repeat back of initiating cue SAT/ UNSAT STD: Proper p
Cue: Acknowledge repeat back providing communications used correction if necessary
- 2. Obtain a copy of the reference procedure and SAT I UNSAT review / utilize the correct section of the procedure p STD: Nl-OP-9 obtained, precautions and limitation reviewed, section G.2.0 referenced
- 3. Open the following valves: (Step 2.6) 3a. 201-10, DW AIR VENT & PURGE ISOLATION PASS/ FAIL VALVE 11 p STD: Rotates 201-10 control switch CW NRC 2015 JPM S-2 Page 5 of 9 March 2015
=~Exelon Generation 3b. 201-08, TOR AIR VENT & PURGE ISOLATION PASS/ FAIL VALVE 11 p STD: Rotates 201-08 control switch CW 3c. 201-32, DW N2 VENT & PURGE ISOLATION PASS/ FAIL VALVE 11 P STD: Rotates 201-32 control switch CW 3d. 201-16, TORUS N2 VENT & PURGE PASS/ FAIL ISOLATION VALVE 11 P STD: Rotates 201-16 control switch CW
- 4. Applicant should determine from initial SAT I UNSAT conditions, a full de-inert is required for personnel entry to the Drywell and should STD: Determines 19.5%
select "Approximately 19.5%". p oxygen per the initial (Step 2. 7) conditions.
Note: Step 2.8 is N/A
- 5. Notify Chemistry that a Drywell purge is SAT/ UNSAT about to commence.
P STD: Proper communications used
- 6. Start 201-35, DRYWELL & TORUS VENT & PASS/ FAIL PURGE (Step 2.10) p STD: Rotates 201-35 control switch CW NRC 2015 JPM S-2 Page 6 of 9 March 2015
Exelon Generation
- 7. Verify open the following valves: (Step 2.11) SAT/ UNSAT
- 201-21, DW & TOR VENT & PURGE FAN STD: Observes red light p
INLET BV on, green light off for
- 201-22, DW & TOR VENT & PURGE FAN both OUTLET BV
- 8. Throttle open 201-31, DW N2 VENT & PURGE PASS I FAIL ISOLATION VALVE 12 (Step 2.12) STD: Rotates 201-31 p
control switch CW Sa. SAT/ UNSAT STD: Throttles 201-31 by using pull-to-stop feature of control switch
- 9. Throttle open 201-17, TORUS N2 VENT & PASS/ FAIL PURGE ISOLATION VALVE 12 (Step 2.13) STD: Rotates 201-17 p
control switch CW Cue: After 201-17 is opened, report drywell and torus pressure is below 0 psig for purposes of this JPM (time compression used).
9a. SAT I UNSAT STD: Throttles 201-17 by using pull-to-stop feature of control switch NRC 2015 JPM S-2 Page 7 of 9 March 2015
Exelon Generation
- 10. When drywell and Torus pressures drops SAT I UNSAT BELOW 0 psig, open the following valves:
P STD: Continues the JPM based on examiner cue.
lOa 201-09, DW AIR VENT & PURGE ISOLATION PASS/ FAIL VALVE 12 P STD: Rotates 201-09 control switch CW lOb 201-07, TOR AIR VENT & PURGE ISOLATION PASS/ FAIL VALVE 12 STD: Rotates 201-07 p
control switch CW Cue: Another operator will complete this procedure.
Cue: Your task is complete.
Drywell vented to atmospheric pressure in accordance with Nl-OP-9.
NRC 2015 JPM S-2 Page 8 of 9 March 2015
Exelon Generation JPM Handout Given:
- The plant is shutdown, <212°F.
- The Operations Manager has determined a complete de-inert to 19.5% Oxygen is necessary.
- Nl-OP-9 is completed through Step G.2.6.2.
(Operators Name), vent the Drywell in accordance with Nl-OP-9, starting at step G.2.6.3. Secure venting when Drywell pressure is below O psig.
NRC 2015 JPM S-2 Page 9 of 9 March 2015
=~Exelon Generation Training Id: 2015 NRC JPM S-3 Revision: 0.0
Title:
MSIV Stroke Test and Limit Switch Test (N1-ST-Q26)
Approvals:
Signature I Printed Name Developed By &~~ /'J/ &-~ Paul Isham 03/17/14 Validated By Pat O'Brien 8/20/14 Facility Reviewer 15 minutes Documentation of Performance:
Performer:
Evaluator:
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments:
Evaluators Signature: ----------
Date:
NRC 2015 JPM S-3 Page 1of10 March 2015
Exelon Generation References
- 1. Nl-ST-Q26
- 2. NUREG 1123 K/A 239001 A4.01, (4.2/4.1)
NRC 2015 JPM 5-3 Page 2 of 10 March 2015
=:rExelon Generation Instructor Information A. JPM Information
- 1. Description
- a. This JPM tests the operator's ability to operate MSIV controls for a surveillance test and verify proper indications.
- b. This JPM is NOT considered alternate path.
- 2. Task Information:
- a. Nl-239001-01026
- b. K/A 239001 A4.01, (4.2/4.1)
- 3. Evaluation I Task Criteria Perform Simulator No No Yes
- 4. Recommended Start Location
Exelon Generation
- 5. Simulator Setup (if required)
- a. The reactor is in an operating condition
- b. Initialize simulator to IC 162
- 6. JPM Setup (if required)
- a. Section 7, prerequisites, and section 8.1 marked complete.
B. Read Before Every JPM Performance
- 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
C. Read Before Each Evaluated JPM
- 1. This evaluated JPM is a measure of your ability to perform this task independently.
The CRS has determined that a verifier is not available and that additional verification will not be provided.
NRC 2015 JPM S-3 Page 4 of 10 March 2015
Exelon Generation Given:
- The plant is operating at 100% power.
- All prerequisites for N1-ST-Q26 are complete.
- Section 8.1 has been completed.
Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), test Main Steam Line Isolation Valve 112 in accordance with N1-ST-Q26, Section 8.2.
';'~;J,;>:f;:',~-1:QRi*),
~ :':<'."' :*
'~J :,}* ,,
- 1. Provide repeat back of initiating cue SAT/ UNSAT p STD: Proper Cue: Acknowledge repeat back providing communications used correction if necessary
- 2. Obtain a copy of the reference procedure and SAT I UNSAT review/ utilize the correct section of the procedure p STD: N 1-ST-Q26 obtained, precautions &
limitations reviewed
- 3. Prepare to initiate a Half-Scram on CHANNEL 11: (Step 8.2.1) 3a. Verify NO RPS Half-Scram signals exist SAT/ UNSAT p
STD: Observes all scram solenoid lights energized 3b. Notify CRO that the following steps will SAT/ UNSAT initiate a Half-Scram p
STD: Proper communications used NRC 2015 JPM S-3 Page 5 of 10 March 2015
~* Exelon Generation 3c. Verify all four MSIV SOV continuity ammeters SAT I UNSAT indicate greater than lOOmA STD: Dispatch another Role Play: If dispatched to the Aux Control p operator to the Aux Room, acknowledge the request and report Control Room to perform all four MSIV SOV continuity ammeters the verification indicate greater than lOOmA
- 4. Place Main Steam Isolation Valve 7% Test PASS/ FAIL Switch to the 112 position (Step 8.2.2)
P STD: Test switch is rotated to the 112 position
- 5. Confirm 01-03 MSIV 112 white test light ON SAT/ UNSAT (Step 8.2.3) p STD: White test light for MSIV 112 is verified
- 6. Confirm 01-03 MSIV 112 yellow light OFF SAT I UNSAT (Step 8.2.4) p STD: Yellow light for Note: Step 8.2.5 will be N/A. MSIV 112 is verified de-energized Note: JPM steps 7 to 11 will occur in rapid sequence; expect annunciators Fl 7 and Fl-2-1.
Cue: Notify the candidate that you will be monitoring the valve mimic board for MSIV 112.
- 7. Momentarily place 01-03 MSIV-112 control PASS/ FAIL switch to CLOSE position (Step 8.2.6) p STD: Rotates control switch for MSIV 112 momentarily CCW to CLOSE, then releases NRC 2015 JPM S-3 Page 6 of 10 March 2015
=~Exelon Generation
- CHANNEL 11 SCRAM SOLENOID GROUPS 1, 2, 3, 4, white light off
- CHANNEL 11 B.U.
SCRAM S.D.V. VENT &
p DRAIN VALVE red light off Cue: If Fl-1-7 is cleared before candidate
- Annunciator Fl-1-7, completes verification, report that Fl-1-7 RPS CH 11 MN STM alarmed and cleared as expected. LINE 11 ISOL VALVE CLOSED, alarms
- Annunciator Fl-2-1, RPS CH 11 AUTO REACTOR TRIP, alarms
- 9. Confirm 01-03, MSIV-112 automatic partial SAT/ UNSAT closure indications STD: Observes:
- 01-03 MSIV-112 Green Light ON momentarily p
- 01-03 MSIV-112 Red Cue: The MSIV 112 mimic light came on Light ON and went off as expected.
- 01-03 MSIV-112 Mimic Light ON momentarily
- 10. Confirm 01-03 MSIV-112 yellow light SAT I UNSAT illuminated BRIGHT P STD: Observes 01-03 MSIV 112 yellow test light ON brightly NRC 2015 JPM S-3 Page 7 of 10 March 2015
=:rExelon Generation
- 11. Confirm 01-03 MSIV-112 automatic opening SAT I UNSAT indications STD: Observes:
- 01-03 MSIV-112 Green Light OFF p
- 01-03 MSIV-112 Red Light ON
- 01-03 MSIV-112 Mimic Light OFF
- 12. Place MSIV 7% Test Switch to the OFF PASS/ FAIL position STD: Rotates Test Switch p
Cue: Inform candidate that another to OFF operator has completed the Independent Verification.
- 13. Confirm 01-03 MSIV 112 White Test Light SAT/ UNSAT OFF P STD: Observes White Test Light for MSIV-112 is OFF
- 14. Confirm 01-03 MSIV 112 Yellow Light OFF SAT/ UNSAT P STD: Observes Yellow Light for MSIV-112 is OFF
- 15. Depress REACTOR TRIP RESET at PASS/ FAIL Panel E STD: Depresses Rx Trip Fl-2-1 clears RESET Button on E-Console NRC 2015 JPM S-3 Page 8 of 10 March 2015
=~Exelon Generation
- CHANNEL 11 SCRAM SOLENOID Groups 1,2,3,4 White Light ON
- CHANNEL 11 BACKUP SCRAM VALVE S.D.V.
VENT ND DRAIN VALVE Red Light ON
- Annunciator Fl-1-7, RPS CH 11 MN STM LINE 11 ISOL VALVE CLOSED, clear
- Annunciator Fl-2-1, RPS CH 11 AUTO REACTOR TRIP, clear Cue: Your task is complete.
Nl-ST-Q26 completed for MSIV 01-03.
NRC 2015 JPM S-3 Page 9 of 10 March 2015
Exelon Generation JPM Handout Given:
- The plant is operating at 100% power.
- All prerequisites for Nl-ST-Q26 are complete.
- Section 8.1 has been completed.
(Operators Name), test Main Steam Line Isolation Valve 112 in accordance with Nl-ST-Q26, Section 8.2.
NRC 2015 JPM 5-3 Page 10 of 10 March 2015
=:""Exelon Generation Training Id: 2015 NRC JPM S-4 Revision: 0.0
Title:
Transfer House Loads from Reserve to Normal - N 1-0P-30 Approvals:
Printed Name Developed By ~/~p au llh s am 03/17/14 Validated By Leigh Mason 8/20/14 Facility Reviewer Approximate Duration: 15 minutes Documentation of Performance:
Performer:
Evaluator:
Start Time: Stop Time: Completion Time Grade: Pass I Fail Comments:
Evaluators Signature: Date:
NRC 2015 JPM 5-4 Page 1of10 March 2015
Exelon Generation References
- 2. NUREG 1123 K/A 262001 A4.04, (3.6/3.7)
NRC 2015 JPM S-4 Page 2 of 10 March 2015
=~Exelon Generation Instructor Information A. JPM Information
- 1. Description
- a. This JPM tests the operator's ability to manipulate electrical system controls to parallel two AC sources. The operator will shilt house service loads from the reserve transformers to the normal transformers, as is done during a plant start up.
- b. This JPM is NOT considered alternate path.
- 2. Task Information:
- a. Nl-262001-01001
- b. K/ A 262001 A4.04, (3.6/3. 7)
- 3. Evaluation I Task Criteria Perform Simulator No No Yes
- 4. Recommended Start Location
Exelon Generation
- 5. Simulator Setup (if required)
- a. The reactor is in a power operating condition
- b. Initialize simulator to IC 162
- c. Verify Powerboards 11 and 12 are ready to be transferred to the normal transformer.
- 6. JPM Setup (if required)
- a. Provide copy of Nl-OP-30 B. Read Before Every JPM Performance
- 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
C. Read Before Each Evaluated JPM
- 1. This evaluated JPM is a measure of your ability to perform this task independently.
The CRS has determined that a verifier is not available and that additional verification will not be provided.
NRC 2015 JPM S-4 Page 4 of 10 March 2015
Exelon Generation Given:
- The reactor is in an operating condition after a recent plant startup
- The reserve transformers are supplying house loads
- Main Generator load is stable
- S-ODP-OPS-112 Attachment 4 has been completed for transferring House loads Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), transfer normal house service from the reserve transformers to normal in accordance with Nl-OP-30, section E.15.
- 1. Provide repeat back of initiating cue SAT/ UNSAT p
Cue: Acknowledge repeat back providing STD: Proper communications used correction if necessary
- 2. Obtain a copy of the reference procedure and SAT I UNSAT review / utilize the correct section of the p STD: Nl-OP-30 obtained.
procedure Precautions & limitations reviewed & section E.15 referenced
- 3. Confirm Main Generator load stable SAT/ UNSAT (Step 15.1)
STD: Observes main p generator megawatts stable (meters on Panels E or A7, digital indication on Panel K). Or determines stable from initial conditions.
NRC 2015 JPM S-4 Page 5 of 10 March 2015
=:r-Exelon Generation NRC 2015 JPM S-4 Page 6 of 10 March 2015
Exelon Generation A~*
. P,/S.
- 8. Close Breaker R113 AND immediately open PASS/ FAIL R112 STD: Rotates Rl 13 control (Step 15.6) switch CW to CLOSE, observes red light on and p green light off.
When Rl 13 is closed, rotates Rl 12 control switch CCW to TRIP, observes green light on and red light off
- 9. Leave R112 control switch in neutral position SAT/ UNSAT (Step 15.7) p STD: Releases Rl 12 control switch to NEUTRAL
- 10. Place Sync Key in OFF position SAT I UNSAT (Step 15.8) p STD: Rotates Sync. Key in Breaker R113 CCW to OFF
- 11. Remove Sync Key from R113 SAT/ UNSAT (Step 15.9) p STD: Removes Sync. Key from Breaker R113
- 12. Insert Sync Key in R122 AND perform the SAT I UNSAT following:
p STD: Positions Sync. Key in (Step 15.10)
Breaker R122 12a Turn Sync Key ON PASS/ FAIL P STD: Rotates Sync. Key for Breaker R122 CW to ON 12b Confirm incoming voltage slightly above SAT/ UNSAT running voltage p STD: Observes INCOMING and RUNNING voltages NRC 2015 JPM S-4 Page 7 of 10 March 2015
Exelon Generation 12c IF required, THEN make voltage adjustment SAT I UNSAT with Tap Changer on Transformer 10.
STD: Adjusts TAP CHGR P CONT TRANS 10 to match incoming and running voltages, if required
- 13. Close Breaker R122 AND immediately open PASS/ FAIL R123 (Step 15.11) STD: Rotates R122 control switch CW to CLOSE, observes red light on and p green light off.
When R122 is closed, rotates R123 control switch CCW to TRIP, observes green light on and red light off
- 14. Leave R123 control switch in neutral position SAT/ UNSAT (Step 15.12) p STD: Releases R123 control switch to NEUTRAL
- 15. Place Sync Key in OFF position SAT I UNSAT (Step 15.13) p STD: Rotates Sync. Key in Breaker R122 CCW to OFF
- 16. Remove Sync Key from R122 SAT I UNSAT (Step 15.14) p STD: Removes Sync. Key from Breaker R122
- 17. Adjust Power Boards 11 AND 12 voltages to SAT I UNSAT I NA 4160 volts using Tap Changer on Transformer 10. p STD: Adjusts TAP CHGR CONT TRANS 10, if required (Step 15.15)
NRC 2015 JPM S-4 Page 8 of 10 March 2015
=~Exelon Generation
- 18. Notify Electrical Maintenance to complete SAT I UNSAT Attachment 12 of Nl-0P-43A to confirm Auto p STD: Proper transfer capability.
communications used (Step 15.16)
Cue: Your task is complete.
House loads are supplied by the normal transformer - T-10.
NRC 2015 JPM S-4 Page 9 of 10 March 2015
=:r-Exelon Generation JPM Handout Given:
- The reactor is in an operating condition after a recent plant startup
- The reserve transformers are supplying house loads
- Main Generator load is stable
- S-ODP-OPS-112 Attachment 4 has been completed for transferring House loads
{Operators Name), transfer normal house service from the reserve transformers to normal in accordance with Nl-OP-30, section E.15.
NRC 2015 JPM 5-4 Page 10 of 10 March 2015
Exelon Generation Training Id: 2015 NRC JPM S-5 Revision: 0.0 Shift Reactor Building Operating Exhaust and Supply Fans From
Title:
- 11 to #12 (Faulted)
Approvals:
Developed By Paul Isham 03/17/14 Validated By Pat O'Brien 8/20/14 Facility Reviewer Greg Elkins Approximate Duration: - - -
15-minutes Documentation of Performance:
Performer:
Evaluator:
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments:
Evaluators Signature: ----------
Date:
NRC 2015 JPM S-5 Page 1of9 March 2015
=~Exelon Generation~
References
- 1. Nl-OP-10, Reactor Building Heating, Cooling, and Ventilating System
- 2. NUREG 1123 K/A 288000 A4.01, (3.1/2.9)
NRC 2015 JPM S-5 Page 2 of 9 March 2015
,1118ar* Exelon Generation Instructor Information A. JPM Information
- 1. Description
- a. This JPM tests the operator's ability to operate the Reactor Building Ventilation System.
- b. This JPM is not considered alternate path, but it is faulted, because one of the newly started fans displays abnormal operating parameters which should prompt the operator to restore reactor building ventilation back to a functioning lineup.
- 2. Task Information:
- a. Nl-288001-01002
- b. K/A 288000 A4.01, (3.1/2.9)
- 3. Evaluation /Task Criteria Perform Simulator No No Yes
- 4. Recommended Start Location
=::rExelon Generation
- 5. Simulator Setup (if required)
- a. Initialize simulator to IC-163
- b. RX Building Supply and Exhaust Fans #11 in service.
- Event trigger - set TRG 3 to ZDHVF02T==O
- Overrides assigned to TRG 3 (Delete overrides when Supply Fan 12 switch is taken to STOP.)
- 11M4A052590, React Bldg supply Fan 12 AMP, Analog Value 1
- 11DS229L05624, Reactor Bldg Supply Fan 12 Green light OFF
- 11DS230L05625, Reactor Bldg Supply Fan 12 SLOW Red light ON
- 11DS216L05617, Reactor Bldg Supply Fan 12 Inlet Damper Green light OFF DT=lSsec
- 11DS217L05618, Reactor Bldg Supply Fan 12 Inlet Damper Red light ON
- 6. JPM Setup (if required)
- a. No steps need to be marked up.
B. Read Before Every JPM Performance
- 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
C. Read Before Each Evaluated JPM
- 1. This evaluated JPM is a measure of your ability to perform this task independently.
The CRS has determined that a verifier is not available and that additional verification will not be provided.
NRC 2015 JPM S-5 Page 4 of 9 March 2015
Exelon Generation(,
Given:
- Reactor Building Exhaust Fan #11, and Reactor Building Supply Fan
- 11 are in service.
Evaluator: Ask trainee if he/she has any questions after presenting initial conditions
{Operators Name), Place Reactor Building Exhaust and Supply Fans #12 in service IAW Nl-OP-10 Section F.1.0 and F.2.0.
'*' '.' ~'
- 1. Provide repeat back of initiating cue SAT/ UNSAT p STD: Proper communications Cue: Acknowledge repeat back providing used correction if necessary
- 2. Obtain a copy of the reference procedure and SAT/ UNSAT review / utilize the correct section of the procedure p STD: Nl-OP-10 obtained.
Precautions & limitations reviewed & section F.1.0 and F.2.0 referenced.
- 3. Verify operating RX Building supply and SAT I UNSAT exhaust fans in SLOW. (Step 1.2.1)
STD: Visually observe p REACTOR BLDG SUPPLY FAN 11 and REACTOR BLDG EXHAUST FAN 11 fans in SLOW red slow light illuminated.
- 4. Start REACTOR BLDG EXHAUST FAN 12 on PASS/ FAIL SLOW (Step 1.2.2)
STD: Rotate REACTOR BLDG p EXHAUST FAN 12 control switch CW to the slow position observe red slow light illuminated, green light off.
NRC 2015 JPM S-5 Page 5 of 9 March 2015
Exelon Generation
\ ~'.'
- 5. Confirm damper 202-07, REACTOR BLDG SAT/ UNSAT EXHAUST FAN 12 OUTLET DAMPER open. p STD: Observe 202-07 open (Step 1.2.3) red light on, green light off.
- 6. Stop REACTOR BLDG EXHAUST FAN 11. PASS/ FAIL (Step 1.2.4) p STD: Rotate REACTOR BLDG EXHAUST FAN 11 control switch CCW to the Off position.
p STD: Observe REACTOR (Step 1.2.5)
BLDG EXHAUST FAN 11 OUTLET DAMPER closed green light on, red light off.
- 8. Confirm normal system flow. SAT I UNSAT (Step 1.3) p STD: Observe annunciator Ll-2-5 RB VENT EXH FLOW LOW is clear.
- 9. Start REACTOR BLDG SUPPLY FAN 12 on PASS/ FAIL SLOW. (Step 2.2.2)
STD: Rotate REACTOR BLDG p SUPPLY FAN 12 control switch CW to the Slow position observe red slow light illuminated, green light off.
- 10. Confirm damper FCV 202-04, REACTOR SAT I UNSAT / NA BLDG SUPPLY FAN 12 INLET DAMPER open. p STD: Observe 202-04 open (Step 2.2.3) red light on, green light off NRC 2015 JPM S-5 Page 6 of 9 March 2015
Exelon Generation Note: Candidate may not notice amps low and continue in procedure to secure Fan 11.
There are 2 success paths.
- 1. Low amps identified after Supply Fan 12 start. Candidate performs steps 11,12,13 and 18, with step 13 a critical step.
- 2. Low amps not identified after Supply Fan 12 start. Candidate performs steps 14,15,16,17,18, with steps 16 and 17 as critical step.
- 11. Identify low amps on REACTOR BLDG SAT I UNSAT I NA SUPPLY FAN 12.
p STD: Observe low amps on Fan 12 (5-10 amps) with Fan 11 amps remaining at normal ( ,,,30 amps).
p STD: Recommend Fan 11 remains in service and Fan Cue: As SM, concur and allow Fan 11 to 12 be shutdown.
remain in service.
- 13. Secure REACTOR BLDG SUPPLY FAN 12. PASS / FAIL / NA p STD: Rotate REACTOR BLDG Note: Booth operator, delete all overrides SUPPLY FAN 12 control when Supply Fan 12 is secured. switch CCW to the Off position.
- 14. Secure REACTOR BLDG SUPPLY FAN 11 SAT/ UNSAT I NA Cue: If directed from Ll-2-4 report the STD: Rotate REACTOR BLDG SUPPLY FAN 11 control following: switch CCW to the Off
- Heating Unit is tripped position and observe red p slow light off, green light
- Inlet Filter differential pressure is normal illuminated.
Observe annunciator Ll-3-4 and Ll-2-4 alarm Observe RB dp indication rises indicating high negative dp NRC 2015 JPM S-5 Page 7 of 9 March 2015
=~Exelon Generation
- 15. Report abnormal indication to SM SAT I UNSAT I NA STD: Recommend returning Cue: As SM, concur and allow Fan 11 to be Fan 11 to service and returned to service and Fan 12 to be securing Fan 12 shutdown.
- 16. Start REACTOR BLDG SUPPLY FAN 11 on PASS I FAIL I NA SLOW.
STD: Rotate REACTOR BLDG SUPPLY FAN 11 control Annunciators Ll-3-4 and Ll-2-4 clear switch CW to the Slow RB dp indication returns to normal position observe red slow light illuminated, green light off.
- 17. Secure REACTOR BLDG SUPPLY FAN 12 PASS / FAIL I NA STD: Rotate REACTOR BLDG Note: Booth operator, delete all overrides SUPPLY FAN 12 control when Supply Fan 12 is secured. switch CCW to the Off position and observe red slow light off, green light illuminated.
- 18. Notify CRS/SM that REACTOR BLDG SUPPLY SAT I UNSAT I NA FAN 11 has been returned to service with STD: Proper communications normal dp and REACTOR BLDG supply FAN p used.
12 is secured.
Cue: Acknowledge report.
Cue: Your task is complete.
Misoperation identified on Supply Fan 12. Supply Fan 11 is running with either Exhaust Fan 11 or 12 running.
NRC 2015 JPM S-5 Page 8 of 9 March 2015
Exelon Generation JPM Handout Given:
- Reactor Building Exhaust Fan #11, and Reactor Building Supply Fan
- 11 are in service.
(Operators Name), Place Reactor Building Exhaust and Supply Fans #12 in service IAW Nl-OP-10 Section F.1.0 and F.2.0.
NRC 2015 JPM S-5 Page 9 of 9 March 2015
=~Exelon Generation Training Id: 2015 NRC JPM S-6 Revision: 0.0
Title:
Control Rod Exercising Operability Test N1-ST-W1 (Alternate Path)
Approvals:
Si rinted Name Developed By
~
4/'/V/~Paul Isham 01/29/2015 Validated By Kerry Henderson 02/03/15 Facility Reviewer Greg Elkins Approximate Duration: 15 minutes Documentation of Performance:
Performer:
Evaluator:
Start Time: Stop Time: Completion Time Grade: Pass I Fail Comments:
Evaluators Signature: - - - - - - - - - - Date:
JPM S-6 Page 1of12 NRC March 2014
Exelon Generation References
- 1. Nl-ST-Wl, Control Rod Exercising Operability Test
- 2. Nl-OP-5, Control Rod Drive System JPM S-6 Page 2 of 12 NRC March 2014
=::--Exelon Generation Instructor Information A. JPM Information
- 1. Description
- a. This JPM tests the operator's ability to perform the weekly control rod exercise surveillance, N 1-ST-Wl.
- b. This JPM is considered alternate path because rod position indication will be lost while exercising rods, requiring the operator to take actions prescribed in the Control Rod Drive Operating Procedure.
- 2. Task Information:
- a. Nl-214000-01001, Monitor RPIS
- b. K/A 214000, A4.02 (3.8/3.8)
- 3. Evaluation I Task Criteria Perform Simulator No Yes Yes
- 4. Recommended Start Location
- a. Unit 1 Simulator JPM S-6 Page 3 of 12 NRC March 2014
=~Exelon Generation
- 5. Simulator Setup (if required)
- a. Initialize simulator to IC-163
- b. Verify RD08R0231 is assigned to trigger 1
- c. Verify Event Trigger #1 hzlrdin==l&hzlrdself(72)==1
- d. Ensure process computer is not available
- 6. JPM Setup (if required)
- a. Prepare a copy of Nl-ST-Wl, marked with step 6.1 - 6.2.4 complete.
JPM 5-6 Page 4 of 12 NRC March 2014
Exelon Generation B. Read Before Every JPM Performance
- 1. For the performance of this JPM, I will act as all those you need to talk to.
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
(Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated.
Repositioning of devices will be simulated by discussion and acknowledged by my cues.
C. Read Before Each Evaluated JPM
- 1. This evaluated JPM is a measure of your ability to perform this task independently. The CRS has determined that a verifier is not available and that additional verification will not be provided.
JPM S-6 Page 5 of 12 NRC March 2014
&:r'Exelon Generation Given:
- The plant is online.
- Weekly Control Rod exercising is in progress.
- The process computer is unavailable.
- Nl-ST-Wl is complete through step 6.2.4.
- No rods are expected to double notch.
Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), Complete Nl-ST-Wl, starting at step 6.2.5. Begin with rod 02-35 and continue with the sequence outlined in attachment 1.
Document applicable rod movement information on attachment 1.
- 1. Provide repeat back of initiating cue p SAT I UNSAT Cue: Acknowledge repeat back providing STD: Proper communications correction if necessary. used.
- 2. Obtain a copy of Nl-ST-Wl and review/ p SAT I UNSAT utilize the correct section of the procedure STD: Obtains copy of Nl-ST-Wl. Section 6.2 is referenced
- 3. Depress the rod select pushbutton for p SAT I UNSAT Control Rod to be tested on Rod Map Display STD: Depresses pushbutton for at E panel. (Step 6.2.5) control rod 02-35. Observes white light lit.
JPM S-6 Page 6 of 12 NRC March 2014
Exelon Generation
- 4. RECORD selected control rod's initial position p SAT/ UNSAT on Attachment 1, Control Rod Exercising STD: Records position 48 for Data Sheet. (Step 6.2.6) control rod 02-35 Cue: If the applicant requests status of V138 (step 6.2. 7), report V138 has a normal response.
- 5. Confirm the following: (Step 6.2.8) p SAT/ UNSAT
- Rod select pushbutton back lighted on STD: Observes both white Rod Map Display lights lit.
- Select light illuminated for appropriate Control Rod at F Panel
- 6. Step 6.2.9 - "IF Control Rod is expected to p SAT I UNSAT double notch ... " STD: Determine step is NA per initial conditions.
- 7. PLACE 4S1, CONTROL ROD MOVEMENT p PASS I FAIL switch to ROD IN position UNTIL ROD IN light STD: Places control rod illuminates. (Step 6.2.10) movement switch to the Rod In position. Observes rod settle at position 46.
- 8. Determines steps 6.2.11, 6.2.12, 6.2.14, p SAT/ UNSAT and 6.2.15 are NA
- 9. Record the following on Attachment 1: p SAT/ UNSAT
- New control rod position STD: Records position 46 for
- Drive-To-Reactor d/p control rod 02-35. And (step 6.2.13) approximately 250 psi differential pressure.
10 Withdraw control rod to initial position as follows: (step 6.2.16)
JPM S-6 Page 7 of 12 NRC March 2014
=::""Exelon Generation 10.a Confirm the following: p SAT/ UNSAT STD: Observes both white
- Rod select pushbutton back lighted on lights lit.
Rod Map Display
- Select light illuminated for appropriate Control Rod at F Panel 10.b PLACE CONTROL ROD MOVEMENT switch in p PASS I FAIL ROD OUT NOTCH, UNTIL ROD IN light STD: Places control rod movement switch to the Rod illuminates.
Out Notch position. Observes rod settle at position 48.
10.c CONFIRM next higher even position p SAT I UNSAT illuminates at F Panel. STD: Observes rod settle at position 48.
10.d Verify final position equals initial position and p SAT/ UNSAT record final position on attachment 1. STD: Records final position on attachment 1 and confirms initial and final positions are the Examiner note: Withdraw to position 48 same.
may be performed concurrently with the coupling check.
- 11. Perform coupling check (step 6.2.17):
11.a SIMULTANEOUSLY PLACE 4Sl to ROD OUT p PASS/ FAIL NOTCH AND 4S3, CONTROL ROD N STD: Simultaneously places Control Rod Movement Switch OVERRIDE switch to NOTCH OVERRIDE.
to Rod Out Notch and the Control Rod N Override Switch to Notch Override.
11.b CONFIRM the following: p SAT I UNSAT STD: Observes position 48 and
- Position 48 illuminates with red red backlighting while holding backlighting remains illuminated for switches.
Control Rod selected at F Panel
- CONTROL ROD OVERTRAVEL annunciator, F3-1-6, does NOT alarm JPM S-6 Page 8 of 12 NRC March 2014
=::"Exelon Generation°'
11.c RECORD Withdrawal Stall Flow on p SAT I UNSAT Attachment 1. STD: Observes stall flow on F Panel. Records on att 1.
11.d Record Satisfactory coupling check p SAT/ UNSAT STD: Checks appropriate block in attachment 1.
- 12. Select next rod to be exercised 12.a Depress the rod select pushbutton for p SAT/ UNSAT Control Rod to be tested on Rod Map Display STD: Depresses pushbutton for at E panel. (Step 6.2.5) control rod 02-31. Observes white light lit.
12.b RECORD selected control rod's initial position p SAT/ UNSAT on Attachment 1, Control Rod Exercising STD: Records position 48 for Data Sheet. (Step 6.2.6) control rod 02-31 on attachment 1.
Cue: If the applicant requests status of V138 (step 6.2. 7), report V138 has a normal response.
- 13. Confirm the following: (Step 6.2.8) p SAT/ UNSAT
- Rod select pushbutton back lighted on STD: Observes both white Rod Map Display lights lit.
- Select light illuminated for appropriate Control Rod at F Panel
- 14. Step 6.2. 9 - "IF Control Rod is expected to p SAT I UNSAT double notch ... " STD: Determine step is NA per initial conditions.
- 15. PLACE 4Sl, CONTROL ROD MOVEMENT p PASS/ FAIL switch to ROD IN position UNTIL ROD IN light STD: Places control rod illuminates. (Step 6.2.10) movement switch to the Rod In position. Observes rod start to move.
JPM S-6 Page 9 of 12 NRC March 2014
Exelon Generation When the rod is moved in, RPIS will fail initiating the alternate path. The applicant should determine rod position is unknown and references Nl-OP-5, Off Normal section to respond to the loss of rod position indication.
- 16. Verify indicating light NOT burnt out at F p SAT I UNSAT Panel.
STD: Determines lights not (Nl-OP-5 Step H.10.1) burnt out.
Cue: Another operator verified the light was not burnt out.
Note: The applicant may make the determination that a light is not burnt out since all position indication for the rod was lost.
- 17. Notify Reactor Engineering. p (Nl-OP-5 Step H.10.2) SAT I UNSAT STD: Reports loss of rod Cue: When contacted as Reactor position indication to Reactor Engineering, acknowledge report. Engineering
- 18. IF control rod lacks position indication, THEN perform the following:
(Nl-OP-5 Step H.10.3) 18.a Insert control rod one notch. p PASS/ FAIL STD: Momentarily places control rod movement switch to Rod In.
JPM S-6 Page 10 of 12 NRC March 2014
Exelon Generation 18.b Confirm the following: p SAT I UNSAT STD: Observes proper response
- ROD IN light illuminates for from RMCS timer lights.
approximately three seconds. Observes next lower rod
- ROD OUT SETTLE light illuminates for position does not display.
approximately four seconds AFTER ROD IN light extinguishes.
- Next lower even position illuminates .
- 19. IF control rod lacks position indication at more than one position AND position CANNOT be determined by other means, THEN perform following:
(Nl-OP-5 Step H.10.4)
- 20. Fully insert control rod. p PASS/ FAIL STD: Places and holds control rod movement sw. to Rod In.
Once control rod 02-31 is being fully inserted, provide the following Cue:
Cue: Time compression. The rod is fully inserted. Your task is complete, another operator will complete the remainder of the ARP actions.
Control Rod 02-31 is being fully inserted.
JPM S-6 Page 11of12 NRC March 2014
Exelon Generation JPM Handout Given:
- The plant is online.
- Weekly Control Rod exercising is in progress.
- The process computer is unavailable.
- Nl-ST-Wl is complete through step 6.2.4.
- No rods are expected to double notch.
(Operators Name), Complete Nl-ST-Wl, starting at step 6.2.5. Begin with rod 02-35 and continue with the sequence outlined in attachment 1.
Document applicable rod movement information on attachment 1.
JPM S-6 Page 12 of 12 NRC March 2014
Exelon Generation Training Id: 2015 NRC JPM S-7 Revision: 0.0
Title:
Place a Second RWCU Pump in Service Approvals:
Si Developed By 03/17/14 Validated By Leigh Mason 8/21/14 Facility Reviewer Approximate Duration: 20 minutes Documentation of Performance:
Performer:
Evaluator:
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments:
Evaluators Signature: Date:
NRC 2015 JPM S-7 Page 1of9 March 2015
- S
- 'r'Exelon Generation References
- 1. Nl-OP-3, RWCU
- 2. NUREG 1123 K/A 204000 A4.01, (3.1/3.0)
NRC 2015 JPM 5-7 Page 2 of 9 March 2015
Exelon Generationoo Instructor Information A. JPM Information
- 1. Description
- a. This JPM tests the operator's ability to operate the RWCU system. The operator will place a second RWCU pump in service and stabilize parameters.
- b. This JPM is NOT considered alternate path.
- 2. Task Information:
- a. Nl-204000-01039
- b. K/A 204000 A4.01, (3.1/3.0)
- 3. Evaluation/ Task Criteria Perform Simulator No No Yes
- 4. Recommended Start Location
Exelon Generation
- 5. Simulator Setup (if required)
- a. Initialize simulator to IC 164
- b. Verify RWCU pump 12 is running
- d. Verify 33-40, Cleanup Sys Flow, is in MANUAL
- e. Verify system flow is between 180 - 220 x 10 3 lbm/hr
- f. Verify NRHX outlet temperature (F359) is displayed
- g. Verify RHX outlet temperature (F363) is displayed
- h. Verify nuisance annunciators failed off:
- 1) Al-4-6
- 2) A2-3-2
- 3) A2-4-4
- 6. JPM Setup (if required)
- a. No steps need to be marked up.
B. Read Before Every JPM Performance
- 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
C. Read Before Each Evaluated JPM
- 1. This evaluated JPM is a measure of your ability to perform this task independently.
The CRS has determined that a verifier is not available and that additional verification will not be provided.
NRC 2015 JPM 5-7 Page 4 of 9 March 2015
=~Exelon Generation Given:
- The plant has scrammed
- The Reactor Water Cleanup System is to be lined up to support further plant shutdown
- NRHX outlet temperature (F359) and RHX outlet temperature (F363) are displayed on the R-time screen.
Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), place a second Reactor Water Cleanup Pump in service in accordance with Nl-OP-3, section E.7. Establish system flow at 325-350 X 103 lbm/hr.
- 1. Provide repeat back of initiating cue SAT/ UNSAT p STD: Proper Cue: Acknowledge repeat back providing communications used correction if necessary
- 2. Obtain a copy of the reference procedure and SAT I UNSAT review/ utilize the correct section of the p STD: Nl-OP-3 obtained procedure Precautions & limitations reviewed Section E.7.0 referenced NRC 2015 JPM S-7 Page 5 of 9 March 2015
Exelon Generation
- 3. Monitor NON-REGENERATIVE HX outlet temp SAT I UNSAT and REGENERATIVE HX inlet temp (Step STD: Monitor NON-7.1)
REGERATIVE HX outlet temp (F359) and Cue: F359 and F363 are indicated on R- REGENERATIVE HX initial time display temp (F363) during the p performance of this section UNTIL system parameters stabilize, AND ensure temperatures do not exceed 120°F as indicated on computer points F359 and F363
- 4. Verify adequate margin exists to core SAT/ UNSAT thermal power limits to prevent exceeding STD: Verifies core power is design or administrative limits when a p less than 1842 MWth second cleanup pump is started and flow is raised (8-12 MWth) (Step 7.3)
- 5. Verify closed 33-15 CLEANUP PUMP 1 SAT/ UNSAT DISCHARGE VALVE (Step 7.4.1)
STD: Observes green light P on, red light off for 33-15 Cleanup Pump 1 Discharge Valve
- 6. Adjust 33-40, CLEANUP SYS FLOW, using SAT/ UNSAT RMC-33-151 to establish cleanup system p STD: Verifies system flow flow between 180 x 10 3 and 220 x 10 3 lbm/hr on chart recorder 35-150 or (360 - 440 gpm) (Step 7.4.2) MA station 33-151
- 7. Verify Open 33-160, CLEANUP PUMP RECIRC SAT/ UNSAT VALVE 11 (Step 7.4.3) p STD: Observes red light on NRC 2015 JPM S-7 Page 6 of 9 March 2015
=~Exelon Generation@
- 8. Verify system pressure as indicated on PI- SAT/ UNSAT 35-131A is being maintained 80 - 100 psig p STD: Observes system (Step 7.4.4) pressure on PI-35-131A is 80 - 100 psig
- 9. START Cleanup Pump 11 PASS/ FAIL (Step 7.4.5)
STD: Rotates control switch for Cleanup Pump 11 CW to p start and observes red flag in window, red light on, green light off, and motor amps increase
- 10. Perform simultaneously: (Step 7.4.6) lOa Slowly jog open 33-15, CLEANUP PUMP 11 PASS/ FAIL DISCHARGE VALVE STD: Rotates CLEANUP PUMP 11 DISCHARGE Note: This valve must be opened in small p VALVE control switch CW to increments to maintain proper system open, until red light is on pressure and green light is off lOb Verify system pressure maintained between SAT/ UNSAT 80 - 100 psig STD: Observes proper response of in-service PCV Note: System pressure may momentarily in AUTO OR adjusts in-p drop below 80 psig while the PCV responds service PCV in MANUAL while jogging open 33-15 to maintain system pressure 80 - 100 psig lOc Maintain pump discharge pressure less than SAT I UNSAT 1400 psig by opening 33-40, CLEANUP SYS STD: Adjusts RMC-33-151 FLOW, using RMC-33-151 p as required to maintain discharge pressure below 1400 psig NRC 2015 JPM S-7 Page 7 of 9 March 2015
=~Exelon Generation
- 11. When 33-15, CLEANUP PUMP 11 DISCHARGE PASS/ FAIL VALVE, is fully open, adjust 33-40 using RMC-33-151, CLEANUP SYS FLOW, to STD: Rotates knob CW to raise system flow to maintain desired flow 250 x 10 3 -380 x 10 3 approximately 325-350 x lbm/hr (500 - 760 gpm) p 10 3 lbm/hr (Step 7.4.7)
Note: 325-350 x 10 3 lbm/hr given in initiating cue Cue: Your task is complete.
Second Reactor Water Cleanup Pump is in service and system flow adjusted to approximately 325-350 x 10 3 lbm/hr.
NRC 2015 JPM S-7 Page 8 of 9 March 2015
Exelon Generation JPM Handout Given:
- The plant has scrammed
- The Reactor Water Cleanup System is to be lined up to support further plant shutdown
- NRHX outlet temperature (F359) and RHX outlet temperature (F363) are displayed on the R-time screen.
(Operators Name), place a second Reactor Water Cleanup Pump in service in accordance with Nl-OP-3, section E.7. Establish system flow at 325-350 X 10 3 lbm/hr.
NRC 2015 JPM S-7 Page 9 of 9 March 2015
Exelon Generation Training Id: 2015 NRC JPM S-8 Revision: 0.0
Title:
Initiate Liquid Poison Injection, RWCU Fails To Isolate Approvals:
Signature I Printed Name Developed By &~ham 03/07/14 Validated By Pat O'Brien 8/21/14 Facility Reviewer ~
_ _. ,. .,_______________ G_r_e~g_E_lk_i_ns z/{J/a
~
Approximate Duration: 15 minutes Documentation of Performance:
Performer:
Evaluator:
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments:
Evaluators Signature: Date:
NRC 2015 JPM 5-8 Page 1of9 March 2015
=:r-Exelon Generation References
- 1. Nl-EOP-HC Attachment 10
- 2. NUREG 1123 K/A 211001 Al.08, (3.7/3.8)
NRC 2015 JPM S-8 Page 2 of 9 March 2015
Exelon Generation Instructor Information A. JPM Information
- 1. Description
- a. This JPM tests the operator's ability to initiate liquid poison and verify proper isolations occur.
- b. This JPM is not considered alternate path.
- 2. Task Information:
- a. Nl-211000-01006
- b. K/A 262001 211001 Al.08, (3.7/3.8)
- 3. Evaluation / Task Criteria Perform Simulator No No Yes
- 4. Recommended Start Location
=~Exelon Generation
- 5. Simulator Setup (if required)
- a. The reactor is in a failure to scram
- b. Initialize simulator to IC 165
- c. Verify the following malfunctions are inserted
- RD33A, RD33C, and RD33E at position 48
- RD33B and RD33D at position 06
- CU12 and CU13 to establish RWCU isolation failure
- d. Verify Mode Switch in shutdown
- e. Verify ADS bypassed
- f. Allow conditions to stabilize.
- 6. JPM Setup (if required)
- a. No steps need to be marked up.
B. Read Before Every l PM Perform a nee
- 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
C. Read Before Each Evaluated JPM
- 1. This evaluated JPM is a measure of your ability to perform this task independently.
The CRS has determined that a verifier is not available and that additional verification will not be provided.
NRC 2015 JPM S-8 Page 4 of 9 March 2015
Exelon Generation Given:
- The plant was operating at 100% power
- A failure to scram has occurred Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), inject Liquid Poison into the Reactor Vessel with Liquid Poison pump 11 in accordance with Nl-EOP-HC, Attachment 10.
- 1. Provide repeat back of initiating cue SAT I UNSAT I NA p STD: Proper Cue: Acknowledge repeat back providing communications used correction if necessary
- 2. Obtain a copy of the reference procedure and SAT I UNSAT I NA review/ utilize the correct section of the p STD: Nl-EOP-HC, procedure Attachment 10 obtained.
- 3. Place Liquid Poison System keylock selector PASS/ FAIL switch to SYS 11 (Step 1.0) p STD: Keylock selector switch is rotated CW to SYS 11 NRC 2015 JPM S-8 Page 5 of 9 March 2015
Exelon Generation
- 4. Confirm: (Step 2.0)
SAT/ UNSAT
- Both explosive valves fire STD:
- Observes squib valves 11 and 12 continuity lights off
- Liquid Poison pump 11 Starts SAT/ UNSAT
- Observes Liquid Poison p pump 11 red light ON, green light OFF, amps and pressure rise PASS/ FAIL
- RWCU System isolates
- Diagnoses failure of Note: RWCU will fail to isolate RWCU to isolate: RWCU system isolation valves remain open with green lights OFF, red lights ON, RWCU pump in service
- 5. Notify CRS that the RWCU system failed to SAT I UNSAT isolate p STD: Proper communication used (GAP-Role Play: Acknowledge RWCU System OPS-01) failed to isolate NRC 2015 JPM S-8 Page 6 of 9 March 2015
=="'Exelon Generation
- 6. IF RWCU does NOT automatically isolate SAT/ UNSAT THEN manually isolate the RWCU system STD: Refers to Nl-OP-3, IAW Nl-OP-3 Section H.11 Note: The Operator may immediately close RWCU isolation valves 33-0lR,33-02R and p 33-04R and/or trip the running RWCU pump.
This satisfies JPM steps 7, 8 and/or 12, and is acceptable to be performed prior to referencing the procedure, as it is a backup to a failed automatic operation.
- 7. Provide close signal to both valves below at PASS/ FAIL H panel (Step H.11.1) p STD: Closes33-02R & 33-04 by rotating individual
- Close 33-02R control switches CCW
- Close 33-04
- 8. Secure all operating cleanup pumps SAT/ UNSAT (Step H.11.2) p STD: Secures RWCU pump 12 by rotating control switch CCW to STOP
- 9. Open ONE of the following valves SAT/ UNSAT
- 33-10, Cleanup to Waste Disposal STD: Opens ONE of the BV p listed valves using common
- 33-11, Cleanup to Condenser BV control switch (Step H.11.3)
Role Play: When asked, state that Rapid Depressurization is NOT required and that RWCU system is to remain pressurized
- 10. Marks step 11.4, N/A, rapid depressurization SAT/ UNSAT NOT required p STD: Step 11.4 marked N/A NRC 2015 JPM S-8 Page 7 of 9 March 2015
Exelon Generation
- 11. If high pressure system is to remain SAT/ UNSAT pressurized, THEN close 33-41, AO Blocking p STD: Closes 33-41, AO Valve.
Blocking Valve by rotating (Step H.11.5) control switch CCW
- 12. Provide close signal at H Panel to 33-0lR, CU PASS/ FAIL Return Isolation Valve 1 (inside) (Step H.11.6) STD: Provides close signal p at H Panel to 33-0lR, CU Return Isolation Valve 1 (inside), by rotating control switch CCW
- 13. Adjust in-service PCV AND 33-165, Cleanup SAT/ UNSAT to Cond & Waste Flow, as required to STD: Adjusts in-service maintain Cleanup system pressure less than PCV AND 33-165, Cleanup 110 psig AND minimize reject flow p to Cond & Waste Flow, as (Step H.11.7) required to maintain Cleanup system pressure less than 110 psig AND minimize reject flow
- 14. Verify closed the following valves SAT I UNSAT (Step H.11.8)
- IV-33-02R p STD: Verifies closed the listed valves (green light
- IV-33-04 ON, red light OFF)
- IV-33-0lR Cue: Your task is complete.
Liquid Poison pump 11 injecting into the Reactor Vessel and Reactor Water Cleanup isolated.
NRC 2015 JPM S-8 Page 8 of 9 March 2015
Exelon Generation JPM Handout Given:
- The plant was operating at 100% power
- A failure to scram has occurred (Operators Name), inject Liquid Poison into the Reactor Vessel with Liquid Poison pump 11 in accordance with Nl-EOP-HC, Attachment 10.
NRC 2015 JPM 5-8 Page 9 of 9 March 2015
Exelon Generation Training Id: 2015 NRC Plant P-1 Revision: 0.0
Title:
Air Start the Diesel Fire Pump Approvals:
Si nature Printed e Developed By Paul Isham 03/18/14 Validated By Leigh Mason 8/19/14 Facility Reviewer Approximate Duration: 20 minutes Documentation of Performance:
Performer:
Evaluator:
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments:
Evaluators Signature: Date:
NRC JPM P-1 Page 1 of 7 March 2015
Exelon Generation References
- 1. N 1-0P-21A, Fire Protection System - Water
- 2. NUREG 1123 K/A 286000, A3.01 (3.4/3.4)
NRC JPM P-1 Page 2 of 7 March 2015
=~Exelon Generation Instructor Information A. JPM Information
- 1. Description
- a. This JPM tests the operator's ability to locally start the diesel fire pump with a loss of control power.
- b. This JPM is not considered alternate path
- 2. Task Information:
- a. Nl-286000-04039
- b. K/ A 286000, A3.0l (3.4/3.4)
- 3. Evaluation/ Task Criteria Simulate Plant No No Yes
- 4. Recommended Start Location
- a. Unit 1 Turbine Building
- 5. JPM Setup (if required)
- a. Provide a copy of Nl-OP-21A NRC JPM P-1 Page 3 of 7 March 2015
=:rExelon Generation B. Read Before Every JPM Performance
- 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
C. Read Before Each Evaluated JPM
- 1. This evaluated JPM is a measure of your ability to perform this task independently.
The CRS has determined that a verifier is not available and that additional verification will not be provided.
NRC JPM P-1 Page 4 of 7 March 2015
Exelon Generation Given:
- The plant is shutdown
- A total loss of DC power has occurred Evaluator: Ask trainee if he/she has any questions after presenting initial conditions (Operators Name), start the diesel fire pump per Nl-OP-21A, Section H.6
- 1. Provide repeat back of initiating cue SAT/ UNSAT p
Cue: Acknowledge repeat back providing STD: Proper communications used correction if necessary.
- 2. Obtain a copy of the reference procedure and SAT/ UNSAT review / utilize the correct section of the procedure p STD: Nl-OP-21A obtained. Precautions and limitations reviewed.
Cue: Step 6.1 is complete Section H.6 referenced.
- 3. Place Diesel Fire Pump Control Switch to SAT I UNSAT OFF.
STD: Local Control s Switch rotated CW to OFF in Diesel Fire Pump Room
- 4. Manually open 100-1211, Solenoid Operated PASS/ FAIL Inlet Valve, to the Woodward Governor.
s STD: Manually opens 100-1211 by rotating override lever CW NRC JPM P-1 Page 5 of 7 March 2015
~, Exelon Generation The Diesel Fire Pump has been manually started.
NRC JPM P-1 Page 6 of 7 March 2015
=:r-Exelon Generation JPM Handout Given:
- The plant is shutdown
- A total loss of DC power has occurred (Operators Name), start the diesel fire pump per Nl-0P-21A, Section H.6 NRC JPM P-1 Page 7 of 7 March 2015
=~Exelon Generation Training Id: 2015 NRC Plant P-2 Revision: 0.0 OATC Actions For Control Room Evacuation {Nl-SOP-21.2)
Title:
{Alternate Path)
Approvals:
Developed By Validated By ~~~~~~~~~~~~L_e~ig~h~M_a_so~n 08/19/2014 Facility Reviewer z;f 1/1;--
25 minutes Documentation of Performance:
Performer:
Evaluator:
Start Time: Stop Time: Completion Time Grade: Pass / Fail Comments:
Evaluators Signature: Date:
NRC JPM P-2 Page 1of10 March 2015
Exelon Generation References
- 1. Nl-SOP-21.2
- 2. NUREG 1123 K/A 295016 AAl.04 (3.1/3.2)
NRC JPM P-2 Page 2 of 10 March 2015
=~Exelon Generation~
Instructor Information A. JPM Information
- 1. Description
- a. This JPM tests the operator's ability to execute OATC actions for a control room abandonment. The actions are primarily associated with local operation of electrical distribution components.
- b. This JPM is considered alternate path because after reporting to the Emergency Diesel Generators, a loss of offsite power will occur causing both EDGs to load.
The operator will be required to execute override actions for the loss of offsite power and the subsequent Hot EDG.
- 2. Task Information:
- a. Nl-296000-01003-01
- b. K/A 295016 AAl.04 (3.1/3.2)
- 3. Evaluation I Task Criteria Simulate Plant No Yes Yes
- 4. Recommended Start Location
- a. Unit 1 Turbine Building
- 5. JPM Setup (if required)
- a. Provide a copy of Nl-SOP-21.2 NRC JPM P-2 Page 3 of 10 March 2015
=:r-Exelon Generation B. Read Before Every JPM Performance
- 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
C. Read Before Each Evaluated JPM
- 1. This evaluated JPM is a measure of your ability to perform this task independently.
The CRS has determined that a verifier is not available and that additional verification will not be provided.
NRC JPM P-2 Page 4 of 10 March 2015
=~Exelon Generation Given:
- You are the OATC.
- A Control Room Evacuation has been ordered due to a fire.
- The Reactor has been scrammed and all control rods are fully inserted.
- The Main Turbine has just been tripped.
- Feedwater Pump 13 could NOT be disengaged from the control room.
- Powerboard 11 and 12 are energized.
Evaluator: Ask trainee if he/she has any questions after presenting initial conditions
{Operators Name), perform OATC actions of Nl-SOP-21.2, Control Room Evacuation, starting at*."
- 1. Provide repeat back of initiating cue SAT I UNSAT p
Cue: Acknowledge repeat back providing STD: Proper communications used correction if necessary.
- 2. Obtain a copy of the reference procedure and SAT/ UNSAT review/ utilize the correct section of the p STD: Nl-SOP-21.2 procedure obtained Section 'C' referenced
- 3. IF Main Turbine NOT tripped, WHEN Reactor SAT/ UNSAT has been scrammed, THEN Trip Main Turbine by rotating AND pulling MASTER TRIP at STD: Determines step is p N/A per initial conditions Front Standard {TB EL 300')
NRC JPM P-2 Page 5 of 10 March 2015
=~Exelon Generation
- 4. IF Feedwater Pump 13 NOT disengaged, PASS/ FAIL THEN Disengage Feedwater Pump 13 locally STD: FWP actuator Note: Once the Candidate has identified the junction boxes identified.
FWP actuator junction boxes, relocate to a Stop buttons depressed.
quieter, lower dose area. Present the Candidate with a picture of the controls s
including the stop button and have them show what they would do.
Cue: Indicated button pushed. The actuator motors have been stopped.
- 5. Proceed to PB 11 and 12 SAT I UNSAT p
STD: Travels to PB 11 and 12 (TB 261' South)
- 6. Is Offsite Power available (voltage on PB SAT/ UNSAT 11/12)?
STD: Determines offsite P power is available per initial conditions or by checking volt meters on PB 11/12.
- 7. At PB 11 and 12, verify the following:
7a Breaker R122 open SAT/ UNSAT STD: Breaker R122 Cue: Breaker R122 green light ON and red s verified open by light OFF.
observing local indications 7b Breaker R113 open SAT/ UNSAT STD: Breaker Rl 13 Cue: Breaker R113 green light ON and red s verified open by light OFF.
observing local indications NRC JPM P-2 Page 6 of 10 March 2015
Exelon Generation NRC JPM P-2 Page 7 of 10 March 2015
Exelon Generation~
- 9. IF D/G loaded due to Loss of Offsite Power (LOOP), THEN:
9a Place D/G Control in LOCAL PASS/ FAIL Note: D/G Control switch is labeled s STD: D/G 103 Control switch placed in LOCAL "REMOTE AUTO" and "LOCAL START".
START 9b Monitor D/G voltage AND HOT ENGINE light SAT/ UNSAT p STD: D/G 103 voltage Cue: DG 103 HOT ENGINE light is AND HOT ENGINE light extinguished, DG 103 voltage is normal.
monitored
p STD: Travels to Diesel Generator Room 102 (TB 261' East)
- 11. IF D/G loaded due to Loss of Offsite Power (LOOP), THEN:
lla Place D/G Control in LOCAL PASS/ FAIL Note: D/G Control switch is labeled s STD: D/G 102 Control switch placed in LOCAL "REMOTE AUTO" and "LOCAL START".
START llb Monitor D/G voltage AND HOT ENGINE light SAT I UNSAT p STD: D/G 102 voltage Cue: DG 102 HOT ENGINE light is LIT, DG AND HOT ENGINE light 102 voltage is normal.
monitored
- 12. IF D/G Control Circuit damage detected SAT/ UNSAT as indicated by HOT ENGINE light s STD: CRS notified illuminated, THEN notify CRS and shutdown EDG 102 as follows:
NRC JPM P-2 Page 8 of 10 March 2015
=~Exelon Generation Cue: Your task is complete.
OATC actions of Nl-SOP-21.2 are complete.
NRC JPM P-2 Page 9 of 10 March 2015
=~Exelon Generation JPM Handout Given:
- You are the OATC.
- A Control Room Evacuation has been ordered due to a fire.
- The Reactor has been scrammed and all control rods are fully inserted.
- The Main Turbine has just been tripped.
- Feedwater Pump 13 could NOT be disengaged from the control room.
- Powerboard 11 and 12 are energized.
(Operators Name), perform OATC actions of Nl-SOP-21.2, Control Room Evacuation, starting at * . "
NRC JPM P-2 Page 10 of 10 March 2015
=:r-Exelon Generation Training Id: 2015 NRC JPM P-3 Revision: 0.0 Emergency Condenser Initiation From the Remote Shutdown Panel
Title:
{Alternate Path)
Approvals:
Si nature Printed Name Date Developed By ~
/~/Paul Isham 03/07/2014 Validated By -----------~/_L_e~ig~h_M_a_so~n 08/19/2014 Facility Reviewer ~ bl,Gb f Lf<'IJ<:
7 Approximate Duration: 15 minutes Documentation of Performance:
Performer:
Evaluator:
Start Time: Stop Time: Completion Time Grade: Pass I Fail Comments:
Evaluators Signature: ----------
Date:
NRC 2015 JPM P-3 Page 1of8 March 2015
=:r-Exelon Generation References
- 1. Nl-SOP-21.2, Attachment 20
- 2. NUREG 1123 K/A 295016 AAl.09, (4.0/4.0)
NRC 2015 JPM P-3 Page 2 of 8 March 2015
=~Exelon Generation Instructor Information A. JPM Information
- 1. Description
- a. This JPM tests the operator's ability to initiate Emergency Condensers from outside the control room in the event of Control Room Abandonment.
- b. This JPM is considered alternate path due to a failure of the automatic EC level control. This requires executing an override step that would not normally be necessary to complete the task.
- 2. Task Information:
- a. Nl-207000-01019
- b. K/A 295016 AAl.09, (4.0/4.0)
- 3. Evaluation/ Task Criteria Perform Plant No Yes Yes
- 4. Recommended Start Location
- a. Unit 1 Turbine Building Elevation 261'
- 5. Simulator Setup (if required)
- a. N/A
- 6. JPM Setup (if required)
- a. Provide a copy of Nl-SOP-21.2, Control Room Evacuation.
NRC 2015 JPM P-3 Page 3 of 8 March 2015
~- Exelon Generation B. Read Before Every JPM Performance
- 1. For the performance of this JPM, I will act as all those you need to talk to. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. (Note, read the next only if conducting a plant JPM). With the exception of accessing panels, no plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
C. Read Before Each Evaluated JPM
- 1. This evaluated JPM is a measure of your ability to perform this task independently.
The CRS has determined that a verifier is not available and that additional verification will not be provided.
NRC 2015 JPM P-3 Page 4 of 8 March 2015
=~Exelon Generation~
Given:
- A control room evacuation has occurred
- All control room actions were completed
- All control rods are in
- RPV Pressure is 900 psig and slowly rising
- RPV Level is 72" and stable
- The Remote Shutdown Keys (VA-1) have been obtained
- You are the CRO
- Offsite Power is available
- Other operators are performing the manual vessel isolation and removing ERV fuses Evaluator: Ask trainee if he/she has any questions a~er presenting initial conditions (Operators Name), Place Emergency Cooling Loop 11 in service in accordance with Nl-SOP-21.2 CRS/CRO actions and commence normal RPV cooldown.
- 1. Provide repeat back of initiating cue SAT I UNSAT STD: Proper p communications used Cue: Acknowledge repeat back providing correction if necessary
- 2. Obtain a copy of the reference procedure and SAT/ UNSAT review/ utilize the correct section of the p STD: Nl-SOP-21.2 obtained and reviewed.
procedure.
- 3. Go to Remote Shutdown Panel #11 SAT I UNSAT p
STD: Proceed to RSP 11, Cue: The EC System has NOT isolated TB 250' South NRC 2015 JPM P-3 Page 5 of 8 March 2015
=::'"Exelon Generation
- 4. Place the Channel 11 CONTROL TRANSFER PASS/FAIL keylock switch in EMERG position to transfer s STD: Rotate the control control to the RSP.
switch to the emergency position
- 5. Verify open 39-07 and 39-09 SAT I UNSAT Cue: 39-07 and 39-09 are open (if s STD: Observe red lights on, green lights off.
necessary).
- 6. Control RPV cooldown by cycling open and PASS/FAIL closed 39-05, EMERGENCY CONDENSER STD: Rotate control COND RTN IV 11 switch for valve 39-05 s CW to the open position, Cue: 39-05 is open. Reactor Pressure is 900 observe red light psig and slowly lowering. RPV water level is energized, green light out.
72" and stable.
Note: The following cue indicates that AUTO shell level control has failed.
Cue: If the candidate references EC shell water level indicator, inform them that EC shell water level is 5.5' and slowly lowering
- 7. Place EC 111/112 Level Control Transfer PASS/FAIL Switch to Local s STD: Rotate control switch CW to the Local position.
- 8. Verify AUTO control by observing "A" on SAT/ UNSAT status panel STD: Observe "A" s illuminated on status Cue: EC shell water level is 5.0' and slowly panel lowering.
- 9. Depress A/M key pad PASS/FAIL S STD: Manual mode selected by depressing the A/M key pad NRC 2015 JPM P-3 Page 6 of 8 March 2015
=~Exelon Generation
- 10. Verify M is displayed SAT I UNSAT Cue: M is illuminated s STD: Observe "M" is illuminated on status panel
- 11. Control level by depressing arrows on key PASS/FAIL pad STD: Level is raised in Cue: EC Condenser Shell is 6.4' and stable.
s the EC Condenser Shell by depressing the key Reactor Pressure is 850 psig and slowly pad arrows.
lowering.
- 12. Report that # 11 EC Condenser in service and SAT I UNSAT EC shell level control is in manual.
p STD: Proper communications used.
(GAP-OPS-01)
Cue: Your task is complete.
Emergency Cooling Loop 11 placed in service in accordance with Nl-SOP-21.2, and EC Shell level is controlled in manual.
NRC 2015 JPM P-3 Page 7 of 8 March 2015
=~Exelon Generation JPM Handout Given:
- A control room evacuation has occurred
- All control room actions were completed
- All control rods are in
- RPV Pressure is 900 psig and slowly rising
- RPV Level is 72" and stable
- The Remote Shutdown Keys (VA-1) have been obtained
- You are the CRO
- Offsite Power is available
- Other operators are performing the manual vessel isolation and removing ERV fuses (Operators Name), Place Emergency Cooling Loop 11 in service in accordance with Nl-SOP-21.2 CRS/CRO actions and commence normal RPV cooldown.
NRC 2015 JPM P-3 Page 8 of 8 March 2015
=~Exelon Generation Copy of __
Training Id: NRC 2015 Scenario 2 Revision: 0.1 Recirc Flow Unit Failure, EC Initiation, Fuel Failure, Un-isolable MSL Break, PB 12 Fails to Fast Transfer, FW Pump 11 Trip, Turbine
Title:
Building Ventilation Trips Si nature Printed Name Date
~-
Developed By Paul Isham 6/2/14 Validated By Pat O'Brien 8/20/14
.. Leigh Mason 8/20/14 Dave Ballard 8/20/14 Facility Reviewer L;;:C_
iY Greg Elkins 2/t,)r Page 1 of 23 NRC Scenario 2 March 2015
Exelon Generation References
- 1. N 1-0P-19, Circulating Water System
- 2. N1-0P-1, NSSS
- 3. N1-SOP-1, Reactor Scram
- 4. N1-SOP-1.1, Emergency Power Reduction
- 5. N1-SOP-25.2, Fuel Failure or High Activity in Reactor Coolant or Off Gas
- 6. N1-SOP-30.2, Loss of PB 12
- 8. N1-EOP-2, RPV Control
- 9. N1-EOP-6, Radioactivity Release Control
- 10. N1-EOP-8, RPV Slowdown
- 11. Unit 1 Technical Specifications Page 2 of 23 NRC Scenario 2 March 2015
Exelon Generation Instructor Information A. Scenario Description Sequence of Events I Expected Crew Response:
The scenario begins at approximately 50-55% power. Containment Spray pump 112 and Reactor Building Exhaust Fan 12 are out of service for maintenance. Circulating Water pump 11 is out of service following maintenance. The crew will start Circulating Water pump 11, then raise Reactor power with recirculation flow.
Then, Recirculation flow unit 11 fails upscale. The crew will respond per the alarm response procedure and the CRS will determine the Tech Spec impact.
Then, an inadvertent EC initiation occurs. The crew will respond to isolate the EC and the CRS will determine the Tech Spec impact.
Next, fuel failure will occur due to the previous transients. The crew will respond per N1-SOP-25.2, Fuel Failure or High Activity in Rx Coolant or Off-Gas. This includes performing an emergency power reduction per N1-SOP-1.1, and eventually scramming the Reactor per N1-SOP-1 (Critical Task). When the Generator trips after the scram, Powerboard 12 will fail to transfer to reserve power. The crew will execute N1-SOP-30.2, Loss of Powerboard 12, to re-energize the powerboard. Feedwater Pump 11 will trip shortly after the reactor scram.
Following the scram, a Main Steam line break will occur. The MSIVs will fail to close both automatically and manually, leading to an un-isolable leak into the Turbine Building. The running Turbine Building ventilation exhaust fan will trip. The crew will start the standby Turbine Building ventilation exhaust fan, however it will trip after a short time delay. This will allow an un-monitored, ground level release from the Turbine Building. The crew will enter N1-EOP-6, Radioactivity Release Control. Field reports will indicate off-site release rates approaching the General Emergency level. The crew will perform an RPV Slowdown per N1-EOP-8 (Critical Task).
- 1. Termination Criteria
- a. RPV water level controlled in assigned band, RPV Slowdown in progress Page 3 of 23 NRC Scenario 2 March 2015
Exelon Generation@
- 2. Critical Tasks CT-1, Given fuel failure causing Main Steam Line radiation levels to approach and/or exceed 3.75 times normal full power background, scram the Reactor, in accordance with N1-SOP-25.2.
Justification:
Safetv Significance: High Main Steam Line radiation levels indicate fuel failure and release of fission products to the Reactor coolant. A Reactor scram reduces the rate of energy production and thus the heat input, radioactivity release, and flow down the Main Steam Lines. Scramming the Reactor also allows further mitigating actions, such as Reactor isolation and depressurization.
Cueing: Multiple annunciators and radiation monitors will provide indications of fuel failure. N1-SOP-25. 2 directs scramming the Reactor.
Measurable Performance Indicators: Rotation of the Mode Switch to SHUTDOWN or depressing the manual scram pushbuttons will provide observable actions for the evaluation team.
Performance Feedback: Control rod position and Reactor power indications will provide performance feedback regarding the success of the scram.
CT-2, Given an un-isolable primary system discharging outside of primary and secondary containments and off-site release rate approaching the General Emergency level, perform an RPV Slowdown, in accordance with N1-EOP-6.
Justification:
Safety Significance: An un-isolable primary system discharging outside of Primary and Secondary Containments resulting in off-site release rates approaching the General Emergency limit indicates a significant problem posing a direct and immediate threat to the health and safety of the public. A blowdown minimizes flow through the break, rejects heat to the suppression pool in preference to outside the containment, and places the primary system in the lowest possible energy state. This will lower the release of radioactivity to the environment and lower the dose received by the public.
Cueing: Multiple annunciators will provide indications of a primary system discharging into the Turbine Building. MSIV valve position indicators will provide indication that the system is un-isolable. Field reports will provide indication that off-site release rate approaches the General Emergency level. N1-EOP-6 provides direction to blowdown the Reactor.
Measurable Performance Indicators: The crew will manually initiate Emergency Condensers and open ERVs.
Performance Feedback: Emergency Condenser and ERV instrumentation will provide indication that these systems are functioning properly once placed in service. Multiple Reactor pressure indicators and annunciators will provide performance feedback regarding the success of the blowdown.
Page 4 of 23 NRC Scenario 2 March 2015
Exelon Generation
- 3. Length
- a. -60 minutes
- 4. Mitigation Strategy Code
- a. RR4, Primary system leak outside of primary and secondary containment, RPV Blowdown required due to General Emergency release rate approached
- 5. Technical Specifications
- a. TS 3.6.2.a and g
- b. TS 3.1.3.b
- 6. EAL Classification
- 7. Special Orders
- a. None Page 5 of 23 NRC Scenario 2 March 2015
Exelon Generation
- 8. Initial Conditions
- 1. IC Number
- a. IC-152
- 2. Presets I With Triggers
- a. Malfunctions
- 1) CT01 B, CT Pump 112 Trip Inserted
- 2) HV01 B, Reactor Building Exhaust Fan Trip 12 Inserted
- 3) E027, PB 12 Auto Transfer Failure Inserted
- 4) NM36A, RECIRC FLOW CONVERTER CHANNEL 11 FAILURE - UPSCALE TRG 1
- 5) EC038, EC RETURN VALVE FAILS OPEN(IV 39-06) TRG2
- 6) RX01, FUEL CLADDING FAILURE, FV=34, IV=10, RT=5:00 TRG4
- 7) M501, Steam Line Break Outside PC Area, FV=12, IV=5, RT=4:00 TRG5
- 8) FW03A, FEEDWATER PUMP TRIP 11 Inserted
- 9) M513A, MSIV FAILS OPEN MS01-01(111), FV=10% Inserted
- 10) M513C, MSIV FAILS OPEN MS01-03(112), FV=10% Inserted
- b. Remotes
- 1) E040A, l&C Bus 130 NC Supply Breaker from IC XFMR (PB 13B), Open TRG15
- 2) E0408, l&C Bus 130 NO Supply Breaker from PB 167A, Closed, DT=5sec TRG 15
- c. Overrides
- 1) 115300154110, POS_11L9/203-01APOSA, FV=on, DT=2:00 TRG5
- 2) 115300154111, POS_2 1L9/203-01A POS C, FV=off, DT=2:00 TRG5 (Turbine Building Ventilation exhaust fan 11 trips)
- 3) 115310154112, POS_11L9/203-01APOSA, FV=on, DT=1:00 TRG6
- 4) 115310154113, POS_2 1L9/203-01A POS C, FV=off, DT=1:00 TRG6 (Turbine Building Ventilation exhaust fan 12 trips)
Page 6 of 23 NRC Scenario 2 March 2015
Exelon Generation@
- d. Annunciators
- 1) None
- e. Event Triggers Event# ., Sv4tnt ActiOR
. :.',) ,,
f~i comm*nd TRG 6, Initiates Turbine Building exhaust fan 12 is started zdhvtbft(6)==0 Blank TRG 10, Ramps up fuel failure once the stack isolates hzlog002g==1 imf rx01 (0 0) 45 8:00 34
- f. Equipment Out of Service
- 1) Containment Spray Pump 112 in PTL with yellow tag
- 2) Containment Spray suction isolation valve 112 closed with yellow tag
- 3) Reactor Building Exhaust Fan 12 secured with yellow tag
- 4) Circulating Water Pump 11 secured with no tag
- g. Support Documentation
- 1) RMI for power ascension with recirc flow
- 2) Markup N1-0P-19 Section E.2.0 up to step E.2.7
- 3) Markup N1-0P-43B Section F.3.0 to the appropriate steps for 50% power level (up to F.3.25 with steps 3.20 and 3.23 still open)
- h. Miscellaneous
- 1) Ensure TB Exhaust Fan 11 is in service
- 2) Protect the following equipment: EOG 103, PB 103, PB 12, Gire Water pump 12
- 3) Update Divisional Status Board
- 4) DW Cooling Fan 11 secured Page 7 of 23 NRC Scenario 2 March 2015
Exelon Generation SHIFT TURNOVER INFORMATION ON COMING SHIFT: IN ID DATE: _;T;....;:o'-=d=a'""'"y_ __
PARTI: To be performed by the oncoming Operator before assuming the shift.
PART II: To be reviewed by the oncoming Operator before assuming the shift.
- LCO Status (SRO)
- Shift Turnover Information Sheet Evolutions/General Information/Equipment Status:
- Reactor power is approximately 55%.
- Containment Spray pump 112 is out of service for maintenance (Day 1 of planned 2 day window; 15 day LCO per TS 3.3.7.b).
- Reactor Building Exhaust Fan 12 is out of service for maintenance.
PART Ill: Remarks/Planned Evolutions:
- Start Circulating Water pump 11 per N1-0P-19 Section E.2.0. The section is complete up to step E.2. 7. In step E.2.11, it is desired to stop both Circulating Water Priming pumps. A Plant Operator is standing by in the screen house.
- Continue Reactor power ascension with Recirculation flow per the provided RMI and N1-0P-43B.
N1-0P-43B Section F.3.0 is in progress.
Page 8 of 23 NRC Scenario 2 March 2015
_.,.,, Exelon Generation ATTACHMENT 2: REACTIVITY MANEUVER INSTRUCTION Reactivity Maneuver: Power Ascension from 55% Step: 1 I INITIAL CONDITIONS/STEP DESCRIPTION
,/
I RE presence required in the Control Room? Yes_ No If YES above, RE presence not required for steps_.
Initial conditions to be verified prior to initiation of step:
Parameter Expected Range Actual Parameter Expected Range Actual CTP 1030-1070 MWth Description of Step:
Raise Reactor power to approximately 65% with Recirculation flow per N1-0P-43B.
Critical parameters to be monitored DURING Step:
Critical parameters not used must be deleted OR marked N/A Critical Parameter Limit Owner Frequency Contingency 67.5 Recirc Flow RO Continuous Stop evolution and consult RE.
Mlbm/hr Lower power to less than 1850 MWth with CTP 1850 MWth RO Continuous Recirculation flow.
Rod line 108% RO 15 minutes Stop evolution and consult RE.
RMI evaluated against approved power profile:* N/A D. I IOther Comments:
I Step Prepared by: Alex Reed I Today Step Reviewed by: Jack Dean I Today RE/STA Date RE/STA/SRO Date Approval to perform Step John Aaron I Today Step Completed by: I Shift Manager Date SRO Date Page 9 of 23 NRC Scenario 2 March 2015
Exelon Generation Shift Turnover z~A6uonsf .. .. Plant Response I* o*pe:*ratC>rActtcms' Take the Simulator out of freeze before the crew enters for the pre-shift walkdown.
- Verify annunciator sound turned on
- If recording scenario, start the recording device during the pre-shift walkdown Allow no more than 5 minutes to walkdown the Crew panels.
- Walkdown panels
- Conduct shift turnover brief
- Assume the shift Page 10 of 23 NRC Scenario 2 March 2015
Exelon Generation Event #1: Start Circulating Water Pump 11
- The Plant is operating approximately 55% power
- The crew will start Gire Water Pump 11 per N1-0P-19 SRO
- Directs starting Circulating Water pump 11 per N1-0P-19 Section E.2.0
- Provides oversight for evolution BOP
- Reviews N1-0P-19 Section E.2.0 Role Play:
- Verifies running CRD Pump flow greater than 60 When requested, report a good start on Circulating GPM Water pump 11.
- Starts 74-01, CONDSR CIRCULATING WATER PUMP 11 Role Play:
- Closes 74-20, FISH SCREEN DRAIN VALVE 11 When requested, report normal circulating water
- Contacts Operator to confirm normal circulating water pump discharge pressure in Screen House pump discharge pressure in Screen House.
- Verifies the following pumps are stopped per SM direction:
Role Play:
- 75-09, COND. WATER BOX PRIMING If asked as Shift Manager, direct securing both Water PUMP NO. 11 Box Priming pumps.
- 75-08, COND. WATER BOX PRIMING PUMP NO. 12 ATC
- Monitors plant parameters Page 11 of 23 NRC Scenario 2 March 2015
Exelon Generation Event #2: Power Ascension With Recirculation Flow
- The crew will raise power with recirc flow per the RMI SRO
- Directs power ascension with Recirculation flow in accordance with N1-0P-43B and the Reactivity Maneuver Instruction (RMI)
- Provides oversight of reactivity maneuver ATC N1-0P-43B includes the following power-to-flow map
- Acknowledges direction from SRO restrictions:
- Raises Recirculation flow with master
- PRIOR to exceeding 65% flow, verify greater Recirculation flow controller than 50% Rod Line OR that RIP region will NOT
- Monitors APRMs be entered.
- Monitors Recirculation flow
- PRIOR to 100% rod line raise recirc flow to
- Observes power-to-flow map restrictions lb/hr) to avoid the flow biased control rod block line.
BOP Note:
- Monitors individual RRPs for response Recommend initiating the next event when Reactor
- Individual MIA-Speed Control stations power is between 55-60% power. trending uniformly
- Individual RRP indications trending normally for speed increase
- Monitors Feedwater controls for proper response
- FWP 13 FCV responding to power change
- RPV water level remains within program band (65" - 83")
Page 12 of 23 NRC Scenario 2 March 2015
Exelon Generation Event #3: Recirculation Flow Unit Fails Upscale
'Event ..
- Recirc flow unit 11 fails upscale .
Crew responds per ARP F2-2 no manipulations made.
CRS makes Tech Spec determination.
When directed by lead examiner, insert CREW malfunction:
- Recognize/report Recirculation flow unit 11 failed upscale NM36A, RECIRC FLOW CONVERTER CHANNEL 11 FAILURE- UPSCALE TRG 1 Comparator trip occurs resulting in a Rod Block.
The "FLOW COMPARATOR" lamps on the Rod Block Display (PANEL E) will light.
The upscale light on Flow Converter 11 (G Panel) will light Expected Annunciators:
F2-2-6, APRM FLOW UNIT 11 F3-2-1, APRM FLOW UNIT 12 F3-4-4, ROD BLOCK SRO
- Acknowledges reports from crew
- Directs response with ARP F2-2-6
- Consults Tech Spec Tables 3.6.2.a and 3.6.2.g
- Declares APRMs 11-14 inoperable for the upscale scram and rod block functions
- Determines a half scram must be placed on RPS channel 11 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
- Contacts l&C Department for troubleshooting ATC
- Verifies proper power to flow ratio on Power Flow Map on E Panel Page 13 of 23 NRC Scenario 2 March 2015
~* Exelon Generation Event 3 continued BOP
- Executes ARP F2-2-6
- Confirms alarm by observing the following:
o Computer Printout o APRM Flow Comparator on G Panel o LPRM/APRM Trip Auxiliary Panels on G Panel o Rod Block Monitor on E Panel Page 14 of 23 NRC Scenario 2 March 2015
Exelon Generation Event #4: Inadvertent Initiation of Emergency Condenser 12
- Emergency Condenser 12 goes into service inadvertently
- The crew will isolate the EC per the ARPs
- CRS makes Tech Spec determination.
When directed by lead examiner, insert CREW malfunction:
- Recognize/report Emergency Condenser 12 EC03B, EC RETURN VALVE FAILS OPEN (IV 39- initiation
- 06)
- Recognize/report Reactor power and water level TRG2 rising EC 12 Condensate Return Valve (39-06) opens
- Recognize/report no valid Emergency Condenser Reactor power rises initiation signal Reactor water level initially rises Expected Annunciators:
K1-1-5, EMER COND CONDEN RET /SOL VALVE 12 OPEN SRO Role Play:
- Acknowledges reports from crew If dispatched to investigate 39-06, wait 2 minutes and
- Directs response with ARP K1-1-5 then report that there is a significant air leak on the
- Directs securing Emergency Condenser 12 air supply line to 39-06.
- Declares Emergency Condenser 12 inoperable but available
- Enters a 7 day LCO per Tech Spec 3.1.3.b
- May direct entry into N1-SOP-1.5, Unplanned Reactor Power Change Note: BOP The next event should NOT be inserted until Reactor water level has stabilized from this event.
- Executes ARP K1-1-5
- Closes:
0 39-08R EC STM ISOLATION VALVE 122, and/or 0 39-10R EC STM ISOLATION VALVE 121 Page 15 of 23 NRC Scenario 2 March 2015
Exelon Generation Events #5 and #6: Fuel Failure, PB 12 Fails to Fast Transfer.
- A fuel failure occurs due to the power ascension earlier.
- The crew will manually scram the reactor.
- PB 12 will not fast transfer but will be available
- FWP 11 will trip When directed by the lead examiner, insert CREW malfunction:
- Acknowledges/reports annunciator H1-1-7, OFF RX01, FUEL CLADDING FAILURE, FV=34, IV=10, GAS HIGH RADIATION RT=S:OO
- Recognizes rising offgas and main steam line TRG4 radiation levels Rising off-gas radiation levels Rising main steam line radiation levels
- Diagnoses fuel failure Expected Annunciators:
H1-1-7, OFF GAS HIGH RADIATION H1-2-7, OFF GAS RAD MON 11-12 FILTER IJ.P SAMPLE FLOW H1-3-7, MAIN CNDSR OG TIMER STARTED /SOL TD 15 M H1-4-8, AREA RADIATION MONITORS F1-2-7, MAIN STEAM RAD MONITOR CH 11 HI/LO (later)
F4-2-2, MAIN STEAM RAD MONITOR CH 12 HI/LO (later)
Verify the following malfunctions are preset:
ED27, PB 12 Auto Transfer Failure FW03A, FEEDWATER PUMP TRIP 11 Powerboard 12 voltage drops to zero after Generator trip Feedwater pump 11 starts and then immediately trips Page 16 of 23 NRC Scenario 2 March 2015
Exelon Generation Note: SRO Normal Full Power Background (NFPB) Main Steam
- Acknowledges reports Line (MSL) radiation levels are approximately 410 mR/hr at this power level. Any value between 400-
- Directs entry into N 1-SOP-25.2, Fuel Failure/High 500 mR/hr is reasonable. This makes a reasonable Activity range of 1500-1875 mR/hr for the 3. 75 times NFPB
- May direct emergency power reduction per N1-benchmark. The crew may establish a lower threshold for executing the scram and vessel SOP-1.1 as necessary to control radiation levels isolation. Alternately, if the crew scrams and closes
- Provides oversight for reactivity manipulation MSIVs early, 3.75 times NFPB may not be reached.
- Directs Reactor scram CT-1
- Acknowledges scram report
- Enters N1-EOP-2, RPV Control, on low Reactor water level
- Answers "Are all control rods inserted to at least Note:
position 04?" Yes High pressure Feedwater will be unavailable until Powerboard 12 is re-energized.
- Directs entry into N1-SOP-1, Reactor Scram
- Directs Reactor water level control 53-95" using Feedwater/Condensate and CRD Note:
Emergency Condenser 12 is inoperable from a
- Directs Reactor pressure control 800-1000 psig previous event, however, it is still available for on Turbine Bypass Valves or Emergency pressure control if the crew opts to use it. Condenser 11
- May direct MSIVs closed
- Directs manual vessel isolation and entry into N 1-SOP-40.2 if Main Steam Line radiation levels reach 3.75 x Normal Full Power Background (NFPB)
- Enters N 1-EOP-5, Secondary Containment Note: Control, on high area radiation levels Recommend initiating the next event once the crew
- Acknowledges failure of Powerboard 12 to has stabilized the plant post-scram and PB 12 is re- transfer to reserve power energized.
- Directs entry into N1-SOP-30.2, Loss of Powerboard 12 Page 17 of 23 NRC Scenario 2 March 2015
Exelon Generation Events 5 & 6 continued ATC Note: All CRAM rods are already inserted and E
- If directed, performs emergency power reduction Console indication of recirc flow is lost due to earlier per N1-SOP-1.1 malfunctions, thus limiting the ability of N 1-SOP-1.1.
- Places Mode Switch in Shutdown CT-1
- Performs scram verification actions of N 1-SOP-1, Reactor Scram:
- Confirms all rods inserted
- Observes Reactor power lowering
- Places IRMs on range 9
- Down-ranges IRMs as necessary
- Controls Reactor pressure as directed
- May perform a manual vessel isolation by placing both Vessel Isolation Ch 11 and Ch 12 Control Switches on the E Panel to ISOLATION, if necessary Role Play: When dispatched as Chemistry to take BOP samples, acknowledge request.
- Executes N1-SOP-25.2
- Notifies Chemistry to sample offgas and reactor Role Play: When directed to close Turbine Building coolant for gross activity Roof Vents, Sidewall Vents and Roll Doors, wait 2 minutes then report the Turbine Building Roof Vents,
- Directs operator to close Turbine Building Roof Sidewall Vents and Roll Doors are CLOSED. Also Vents, Sidewall Vents and Roll Doors report that RP is with you, and they have detected
- Monitors ARMs and rad monitors to determine higher than normal rad levels near the offgas piping. plant radiation levels
- Notifies CRS/Crew of rising Main Steam Line Note: Normal Full Power Background (NFPB) Main Radiation Monitor levels Steam Line (MSL) radiation levels are approximately
- Notifies CRS if MSL Rad Monitors 410 mR/hr at this power level. Any value between 400-500 mR/hr is reasonable. This makes a approach/exceed 3.75 X Normal Full Power reasonable range of 1500-1875 mR/hr for the 3. 75 Background (NFPB) times NFPB benchmark.
Page 18 of 23 NRC Scenario 2 March 2015
Exelon Generation Event 5 & 6 continued BOP continued
- Performs Reactor water level control actions of N1-SOP-1:
- Attempts to restore RPV water level to 53-95" by controlling injection and rejecting through Note: RWCU, as necessary High pressure Feedwater will be unavailable until
- Determines both electric Feedwater pumps Powerboard 12 is re-energized.
NOT running
- May close MSIVs
- May verify Vessel Isolation per N1-SOP-40.2 ATC/BOP
- Executes N1-SOP-30.2 N1-SOP-30.2 Actions:
- Verifies Reactor scram due to less than 3 operating Recirculation loops
- Verifies Service Water pump 11 running
- Continuously monitors for thermal hydraulic instability
- Verifies:
- TBCLC pump 11 running
- IAC 11 running
- RBCLC system running Note:
- Re-energizes Powerboard 12:
At the examiner's discretion, move on to next event
- Answers "Are A5-4-1, A5-4-2, A5-1-8, OR when PB 12 has been re-energized. A5-2-8 in alarm?" No
- Obtains SRO permission to re-energize Powerboard 12
- Verifies open Breaker R122
- Inserts Sync. Key into R123 AND rotates clockwise to ON
- Closes Breaker R123
- Rotates Sync. Key counterclockwise to OFF AND removes
- Closes Breakers R124 and R121 Page 19 of 23 NRC Scenario 2 March 2015
/118111r' Exelon Generation Events #7, #8, and #9: Main Steam Line Break in Turbine Building, MSIVs Fail to Close, Turbine Building Ventilation Exhaust Fan Trips
- Two MSIVs fail to isolate
- Lose TB Exhaust ventilation leading to unmonitored ground level release, When directed by the lead examiner, insert CREW malfunctions:
- Acknowledges/reports annunciators H1-1-7, OFF M501, Steam Line Break Outside PC Area, FV=12, GAS HIGH RADIATION IV=5, RT=4:00
- Diagnoses Main Steam Line break TRG5 Main Steam tunnel temperatures rise Turbine Building radiation levels rise Expected Annunciators>>
F1-2-2, RPS CH 11 MAIN STM LINE BREAK F2-3-2, MAIN STM LINE BREAK AREA TEMP HIGH F4-2-7, RPS CH 12 MAIN STM LINE BREAK H1-4-8, AREA RADIATION MONITORS The following overrides also insert on TRG 5:
115300154110, P05_11L9/203-01A P05 A, FV=on, OT=2:00 115300154111, P05_21L9/203-01A P05 C, FV=off, OT=2:00 Turbine Building exhaust fan 11 trips on a time delay Page 20 of 23 NRC Scenario 2 March 2015
_.., Exelon Generation Events 7, 8, & 9 continued Verify the following overrides are automatically inserted when Turbine Building exhaust fan 12 is started:
TRG6 115310154112, POS_11L9/203-01A POSA, OT=30, FV=on, OT=1 :00 115310154113, POS_2 1L9/203-01A POS C, OT=30, FV=off, OT=1 :00 Turbine Building exhaust fan 12 trips Verify the following malfunctions are preset:
MS13A, MSIV FAILS OPEN MS01-01(111), FV=10%
MS13C, MSIV FAILS OPEN MS01-03(112), FV=10%
Two MS/Vs fail mid-position on closure Page 21 of 23 NRC Scenario 2 March 2015
Exelon Generation Events 7, 8, & 9 continued SRO
- Acknowledges reports Role Plays:
When the crew has determined both Turbine Building
- Directs MSIVs closed exhaust fans are inoperable, or when requested as
- Directs Turbine Building evacuation RP/Chemistry to assess dose, wait 2 minutes then
- Acknowledges failure of two MSIVs to close report as Off-Site Dose Assessment Manager that dose at the site boundary is 50 mr/hr TEDE and
- May direct cooldown using Turbine Bypass rising. Valves or Emergency Condensers <100°F/hr
- Acknowledges trip of Turbine Building exhaust Three minutes later, report that dose at the site boundary is 500 mrem TEDE and rising. fan 11
- Directs start of Turbine Building exhaust fan 12 Evaluator Cue: After the report is made to the crew
- Acknowledges trip of Turbine Building exhaust that dose at the site boundary exceeds 1OOmrem TEDE, inform the CRS that the Shift Manager is fan 12 declaring a Site Area Emergency per EAL RS1 .2 due
- Dispatches personnel to monitor on-site/off-site to offsite release rate.
radiation levels Three minutes after previous field report, report that
- Acknowledges off-site release rate reports dose at the site boundary is 800 mrem TEDE and
- Enters N 1-EOP-6 due to off-site release rate rising.
above Alert level
- May direct rapid depressurization with Three minutes later, report that dose at the site Emergency Condenser 11 >100°F/hr boundary is 950 mrem TEDE and rising.
- Determines off-site release rate is approaching the General Emergency level Three minutes later, report that dose at the site
- Directs initiation of EC 11
- Directs open 4 ERVs If asked for an update between reports, give an CT-2 extrapolated value for dose at the site boundary.
If dispatched into the plant for any other task, wait 2 minutes and then report that there is excessive steam in the Turbine Building and you have backed out.
Page 22 of 23 NRC Scenario 2 March 2015
Exelon Generation ATC/BOP
- Reports failure of MSIVs to automatically close on high steam tunnel temperature
- Attempts to manually close MSIVs
- Reports failure of two MSIVs to close
- Makes Turbine Building evacuation announcement
- May open Turbine Bypass Valves or initiate Emergency Condenser 11 to cooldown <100°F/hr
- Reports trip of Turbine Building exhaust fan 11
- Starts Turbine Building exhaust fan 12
- Reports trip of Turbine Building exhaust fan 12
- Dispatches personnel to monitor on-site/off-site radiation levels
- Acknowledges/reports off-site release rate reports
- May perform rapid depressurization with Emergency Condenser 11 > 100°F/hr
- Initiates EC 11
- Open 4 ERVs CT-2
- Controls Reactor water level 53-95" using Condensate/Feedwater and CRD
- RPV water level controlled in assigned band
- RPV Slowdown in progress Page 23 of 23 NRC Scenario 2 March 2015
Exelon Generation Copy of __
Training Id: NRC 2015 Scenario 3 Revision: 0.1 Condensate Pump S/D, Sequence Exchange, MSL Rad Monitor Failure, RBCLC TCV Failure, RPS MG Set Trip, Instrument Air Leak,
Title:
ATWS, Feedwater IVs Stick Signature I Printed Name Developed By ~aullsham 6/2/14 Validated By Pat O'Brien 8/20/14 Leigh Mason 8/20/14 Dave Ballard 8/20/14 Facility Reviewer Greg Elkins z/11/1r Page 1 of 28 NRC Scenario 3 March 2015
Exelon Generation References
- 1. N1-0P-5, Control Rod Drive System
- 2. N1-0P-15A, Condensate System
- 3. N 1-0P-48, Motor Generator Sets
- 4. N1-SOP-11.1, RBCLC Failure
- 5. N 1-SOP-1, Reactor Scram
- 6. N1-SOP-16.1, FeedwaterSystem Failures
- 7. N1-SOP-20.1, Instrument Air Failure
- 8. N1-EOP-2, RPV Control
- 9. N1-EOP-3, Failure to Scram
- 11. Unit 1 Technical Specifications Page 2 of 28 NRC Scenario 3 March 2015
Exelon Generation Instructor Information A. Scenario Description Sequence of Events I Expected Crew Response:
The crew assumes the shift at approximately 85% power. Containment Spray pump 112 and Reactor Building Exhaust Fan 12 are out of service for maintenance. The crew is directed to remove Condensate Pump 11 from service immediately for maintenance due to a motor oil leak.
After the pump has been removed from service, the crew will conduct a rod pattern exchange. During the rod pattern exchange, a Main Steam Line Rad monitor will fail inoperable. The SRO will address Tech Specs.
Next, the Reactor Building Closed Loop Cooling (RBCLC) Temperature Controller will fail such that RBCLC temperatures rise. This failure will require placing the RBCLC controller in manual and restoring the effected equipment to normal temperatures.
Then, RPS MG set 141 will trip. The crew will enter SOP-16.1 due to the resulting partial loss of Feedwater heating.
The crew must recover the RPS trip bus by shifting to its alternate supply. Next, an Instrument Air leak will occur in the piping to the CRD system. The crew will insert a manual Reactor scram as CRD air pressure lowers below 60 psig (Critical Task).
When the scram occurs the control rods will not fully insert. The crew must terminate and prevent injection (Critical Task). When the operator attempts to close Feedwater Isolation Valves 11 and 12, the valves will fail to isolate Feedwater flow. The crew must diagnose the failure and place the Feedwater pumps in Pull-To-Lock to terminate feeding the RPV. The crew will lower Reactor power by inserting control rods per EOP-3.1 and/or using Liquid Poison (Critical Task).
- 1. Termination Criteria
- a. RPV water level controlled in assigned band, Reactor power < 6%, Control rod insertion in progress or complete Page 3 of 28 NRC Scenario 3 March 2015
Exelon Generation
- 2. Critical Tasks CT-1, Given lowering CRD system air pressure, the crew will insert a manual reactor scram before control rods begin drifting, in accordance with N1-ARP-F3 and/or N1-SOP-20.1.
Justification:
Safety Significance: Lowering CRD system air pressure can result in various rods drifting to unpredictable locations in the core. This can lead to an unanalyzed rod pattern and localized power peaking resulting in fuel damage.
Cueing: Annunciators on L 1 and F3 will provide indication for lowering plant air pressures. Procedures direct inserting a manual reactor scram for lowering CRD system air pressure.
Measurable Performance Indicators: Inserting a manual reactor scram will provide observable actions for the evaluation team Performance Feedback: Control rod position and Reactor power will provide performance feedback regarding success of crew actions to insert control rods.
Page 4 of 28 NRC Scenario 3 March 2015
Exelon Generation CT-2, Given a failure of the reactor to scram with power above 6% and RPV water level above -41 inches, the crew will terminate and prevent all injection except boron and CRD, in accordance with N1-EOP-3.
Justification:
Safety Significance: High Reactor power after a scram represents a challenge to nuclear fuel and to plant heat sinks. In the event of a loss of the normal heat sink, this may result in adding heat to the Torus and challenging the Primary Containment. Lowering Reactor power reduces these challenges.
Cueing: Control rod position and Reactor power indications will indicate a failure to scram with Reactor power above 6%.
N1-EOP-3 provides direction to trip Recirculation pumps and terminate and prevent injection based on Reactor power.
Measurable Performance Indicators: Manipulation of Recirculation pump control switches, Feedwater system components, and Core Spray jumpers will provide observable actions for the evaluation team.
Performance Feedback: Lowering Recirculation flow, Feedwater flow, Reactor water level, and Reactor power will provide performance feedback regarding the success of crew actions.
CT-3, Given a failure of the reactor to scram with power above 6%, the crew will lower reactor power by inserting control rods or injecting boron, in accordance with N1-EOP-3.
Justification:
Safety Significance: Inserting control rods lowers Reactor power, which reduces challenges to the plant during a failure to scram. Additionally, inserting control rods ultimately provides a long-term, stable core shutdown. Boron injection will lower power, however, alone mav not provide a stable shutdown condition.
Cueing: Control rod position and Reactor power indications will indicate a failure to scram. N1-EOP-3 provides direction to insert control rods.
Measurable Performance Indicators: Manipulation of RPS, CRD, and RMCS controls will provide observable actions for the evaluation team.
Performance Feedback: Control rod position and Reactor power will provide performance feedback regarding success of crew actions to lower power by inserting control rods or injecting Boron.
Page 5 of 28 NRC Scenario 3 March 2015
Exelon Generation
- 3. Length
- a. -60 minutes
- 4. Mitigation Strategy Code
- 5. Technical Specifications
- 6. EAL Classification
- a. Site Area Emergency per EAL SS3.1 - An automatic Scram failed to shut down the reactor as indicated by reactor power >6% AND Manual actions taken at the reactor control console failed to shut down the reactor as indicated by reactor power >6%
- 7. Special Orders
- a. None Page 6 of 28 NRC Scenario 3 March 2015
Exelon Generation B. Initial Conditions
- 1. IC Number
- a. IC-153
- 2. Presets I With Triggers
- a. Malfunctions
- 1) CT01 B, CT Pump 112 Trip Inserted
- 2) HV01 B, Reactor Building Exhaust Fan Trip 12 Inserted
- 4) CW19, RBCLC Temperature Controller Failure, FV=minimum cooling TRG2
- 5) RP01 B, Reactor Trip Bus Motor Generator Trips 141 TRG4
- 6) RD34, Loss of CRD Instrument Air Pres., RT=5:00, FV=20 TRGG
- 7) IA01, Loss of Instrument Air, RT=5:00, FV=40 TRGG
- 8) RD33A, Control Rod Bank Blocked Bank 1, FV=12 Inserted
- 9) RD33B, Control Rod Bank Blocked Bank 2, FV=12 Inserted
- 10) RD33C, Control Rod Bank Blocked Bank 3, FV=18 Inserted
- 11) RD33D, Control Rod Bank Blocked Bank 4, FV=12 Inserted
- 12) RD33E, Control Rod Bank Blocked Bank 5, FV=12 Inserted
- b. Remotes
- 1) FW01A, Condensate Pump 11 Discharge Valve 50-10, FV=close TRG25
- 2) RP02, Rx Trip Bus 141 Pwr Source, FV=maint TRG27
- 5) FW24, Removal of HPCI Fuses FU8/FU9, FV=pulled TRG23 Page 7 of 28 NRC Scenario 3 March 2015
_..,,,, Exelon Generation
- c. Overrides
- 1) OVR-5s5di307 POS_ 1 1F10/31-03A PULL OU, On (FWIV Failure) Inserted
- 2) OVR-5s6di3010 POS_ 1 1F10/31-03A PULL OU, On (FWIV Failure) Inserted
- d. Annunciators
- 1) F1-1-8, Fail Off TRG10
- 2) F3-1-4, Fail Off TRG10
- 3) F4-1-1, Fail Off TRG10
- e. Event Triggers TRG 20 - Activates when ARI is hzlrp12g1 ==1 &&zdrrarov==1 &&anx bat n15scen3trg20.bat overridden, RPS has been reset stat2(177)==0 and SDV has drained to allow a manual scram to achieve full inward rod movement
- f. Equipment Out of Service
- 1) Containment Spray Pump 112 in PTL with yellow tag
- 2) Containment Spray suction isolation valve 112 closed with yellow tag
- 3) Reactor Build Exhaust Fan 12 secured with yellow tag
- g. Support Documentation
- 1) N1-0P-15A section H.9.0, completed through step 9.3
- 2) RMI and Rod Movement Sheets for sequence exchange
- h. Miscellaneous
- 1) Protect the following equipment: EDG 103, PB 103
- 2) Update Divisional Status Board
- 3) Secure DW Cooling fan 11
- 4) Ensure batch file "n15scen3trg20.bat" is in the root batch file directory with the following commands:
- a. dmf rd33a
- b. dmf rd33b
- c. dmf rd33c
- d. dmf rd33d
- e. dmf rd33e Page 8 of 28 NRC Scenario 3 March 2015
=::rExelon Generation SHIFT TURNOVER INFORMATION ON COMING SHIFT: IN ID DATE: _T~o~d~a.._y_ __
PARTI: To be performed by the oncoming Operator before assuming the shift.
PART II: To be reviewed by the oncoming Operator before assuming the shift.
- LCO Status (SRO)
- Shift Turnover Information Sheet Evolutions/General Information/Equipment Status:
- Reactor power is approximately 85%.
- A rod sequence exchange is in progress and has been placed on hold due to an oil leak from Condensate pump 11 motor.
- Containment Spray pump 112 is out of service for maintenance (Day 1 of planned 2 day window; 15 day LCO per TS 3.3.7.b).
- Reactor Building Exhaust Fan 12 is out of service for maintenance.
PART Ill: Remarks/Planned Evolutions:
- Shutdown Condensate pump 11 per N1-0P-15A section H.9.0. Then place the control switch in PTL.
- Continue the Control Rod Sequence Exchange per RMI.
Page 9 of 28 NRC Scenario 3 March 2015
~* Exelon Generation ATTACHMENT 2: REACTIVITY MANEUVER INSTRUCTION Reactivity Maneuver: Rod Sequence Exchange Step: 1 I INITIAL CONDITIONS/STEP DESCRIPTION
,/
I RE presence required in the Control Room? Yes_ No If YES above, RE presence not required for steps_.
Initial conditions to be verified prior to initiation of step:
Parameter Expected Range Actual Parameter Expected Range Actual Recirc Flow 54 - 58 Mlbm/hr 56 Mlbm/hr Description of Step:
Complete attached rod movement sheets.
Critical parameters to be monitored DURING Step:
Critical parameters not used must be deleted OR marked N/A Critical Parameter Limit Owner Frequency Contingency CTP 1850 MWth RO Continuous Lower recirculation flow or insert last notch RMI evaluated against approved power profile:* N/A o.
Other Comments:
Power may rise to as high as 90% on highest reading APRM by the end of the rod withdrawals.
Step Prepared by: Alex Reed I Today Step Reviewed by: Jack Dean I Today RE/STA Date RE/STA/SRO Date Approval to perform Step John Aaron I Today Step Completed by: I Shift Manager Date SRO Date Page 10 of 28 NRC Scenario 3 March 2015
NMP1 ROD MOVEMENT SHEET Insert Step: .l U')
r-1 0
N
..c FROM: 48 TO: 12 ~
ro
- a:
Control Rod lntttals I Mow NIChedc: Coopilg FulOut From Ccrnplete (as Expected) Chedc: ug,t Comments To 14-27 48 12 PR NIA NIA 38-27 48 12 PF!
0
'l"4
'l"4 Q)
@ Ol c 0.
ro 0
+-J m
L
.l!lllill Ta.~--~ .. PFI ""' uti 1C 14 18 ;i:;i: "'O .:JU 34' J8 4;i: "'llO :Kl
(]) lndlvidual confirms rod 51 51 c
(])
position by raselecti~ rods iorby using 00-7 printout 47 43 47 43 C) 39 39 35 35 c: 31 31 0
...,J 27 1 2 27 23 23
~ 19 19 !"")
w 15 11 15 11 0
"i:
ro c
P~ by Alex Reed De* Tooay 07 07 Q)
,,, Vatted 11y Jake Darrow Date To<ISll 02 06 10 14 18 22 26 30 34 38 42 46 50 03 u
(/)
u er:
z
U1 NMP1 ROD MOYEME'NT SHEET Insert
.-i 0
Step: 1 N
..c
~
FROM: 12 TO: 08 ~
ro Cont'OI Rod lnlials I Mew NJ Check Cooping Full Out From Comments Canplete (as Expected) Check U~t To 14-27 12 08 NIA NIA 38-27 12 08 NIA NIA 00 N
0 N
Q)
- Ol ro c a..
0
-I-'
m L
!1_11_111*~ u.:: 00 1C 14 18 .::.:: .::u .ru 34 .,~ 42 46 :ru
(]) lndlvidu!I confirms rod 51 51 c pogftion oy reseledl~ rods Of' by ushg 00-7 printout 47 43 47 43
(])
39 39 C) 35 35 c: 31 31 0
...J 27 1 2 21 23 23
~ 19 19 M w 15 11 15 11 0
ro c
Pl8Jl.-d by Alex Reed De* Today 01 07 llt Q) u 03 03 (/)
vade<I by Jake Darrow Data To<IB)' 02 06 10 14 18 22 26 30 34 38 42 46 50 u er::
z
NMP1 ROD lllO\IEMENT SHEET Withdrawal Step: 1 LI)
.-i 0
FROM: 04 TO: 08 N
..s:::
~
Control Rod Initials I Mo'1e NI Check CoupliflD Full OJt ro F1u111 Cumnienl~ ~
Complete (as ::xpectec) Check Ligtl:
Tc 18-35 04 08 N/A NIA 34-35 04 08 NIA N/A 34-19 04 08 N/A N/A 18-19 04 08 N/A NIA GO N
0 M
'l"'I Q)
@ Ol c 1>ila1uona1 uua11ne1 U2 U> U 14 18 LL 2.6 3U 34 jt1 42 46 !JO a_
ro 0 1na1v1aua1 conrrms roo ~1 b1
+-J (}'.'ISitinn by ff!SP.IP.r.ting roOS 47 47 m
L p: by using 00-7 printout 43 43 39 39 Q) c Q) 35 31 1 2 35 31 27 27 C) 23 23 c: 19 15 4 3 19 15 0
..J 11 11
~
Frepared by Alex Reed Date Tooay 07 07
-**- M 03 w Varifiad ~ Jak~ 03TOW Ono Tomy 02 00 10 14 18 22 26 10 3.t 38 .42 .46 50 0 ro c
Q) u
(/)
u a::
* z
=~Exelon Generation Shift Turnover Take the Simulator out of freeze before the crew enters for the pre-shift walkdown.
- Verify annunciator sound turned on
- If recording scenario, start the recording device during the pre-shift walkdown Allow no more than 5 minutes to walkdown the Crew panels.
- Walkdown panels
- Conduct shift turnover brief
- Assume the shift Page 14 of 28 NRC Scenario 3 March 2015
Exelon Generation Event #1: Shutdown Condensate Pump 11
- Directs shutdown of Condensate pump 11 per N1-0P-15A, Section H.9.0
- Provides oversight for evolution
- Monitors plant parameters BOP
- Acknowledges direction to shutdown Condensate pump 11 Role Play: When directed to slowly close 50-10,
- Notifies SRO to enter LCO for HPCI acknowledge order, wait approximately 1 minute and insert remote:
- Monitors Feedwater Booster pump suction pressure (computer point D454 - 123 psig)
- Directs operator in field to slowly close 50-10, BV FW01A, Condensate Pump 11 Discharge Valve 50- - COND PMP 11 DISCHARGE 10, FV=close
- WHEN the Condensate Pump 11 discharge valve TRG25 is 90% closed, places the pump control switch in PTL Then report 50-10 is 90% closed.
- Verifies:
- Maximum Condensate pump motor current :5 135 amps
- Minimum FW Booster pump suction pressure Role Play: If contacted as operator to report local within the acceptable range of curve shown in FW pump suction pressure, immediately report FW OP-15C attachment 4 (minimum pressure at pump suction pressure based on simulator value of 85% flow (-6 mlbs/hr) is 72 psig)
FWBP discharge pressure minus 50 psig (-300 psi).
- Minimum FW pump suction pressure ~ 200 psig Role Play: When directed to fully close 50-10,
- Directs operator in field to fully close 50-10, BV -
acknowledge order, wait approximately 15 seconds COND PMP 11 DISCHARGE and report valve is fully closed.
- Verifies no abnormal Main Condenser air in-leakage is occurring Page 15 of 28 NRC Scenario 3 March 2015
Exelon Generation
- Directs performance of Control Rod Sequence once sufficient action is observed on the reactivity Exchange per RMI and N1-0P-5 manipulation.
- Provides oversight for reactivity manipulation RO
- Acknowledges direction from SRO Note: RMI includes rods 14-27, 38-27, 18-35, 34-35,
- Obtains copy of RMI 34-19, and 18-19
- Withdraws control rods per rod movement sheets and N1-0P-5
- Turns control rod power on
- Selects rod
- Uses CONTROL ROD MOVEMENT switch to notch rod
- Monitors Feedwater controls for proper response
- FWP 13 FCV responding to power change
- RPV water level remains within program band (65" - 83")
Page 16 of 28 NRC Scenario 3 March 2015
Exelon Generation Event #3: Main Steam Line Radiation Monitor Failure
- A MSL Rad monitor will fail inoperable
- The CRS will address Tech Specs When directed by the examiner, insert malfunction: CREW RM51A, PRM Steam Line Rad Mon 111, Norm
- Acknowledge/report Annunciator F1-2-7, MAIN Malfunction, FV=O STEAM RAD MONITOR CH 11 HI/LO TRG 1
- Diagnose failure of MSL Rad Monitor 111 Expected Annunciator:
F1-2-7, MAIN STEAM RAD MONITOR CH 11 HI/LO SRO
- Acknowledges report of MSL Rad Monitor alarm
- Directs execution of ARP for F1-2-7
- Acknowledges MSL Rad Monitor has failed
- Enters TS Table 3.6.2.h (requires placing channel rad monitor failure, report that you will begin an in the tripped condition within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or immediate investigation verifying Mechanical Vacuum pump isolated)
- Monitors plant parameters BOP
- Executes ARP for F1-2-7
- Observes downscale light on MSL Rad Monitor Ch 11 and diagnoses the Monitor is INOP
- Notifies crew MSL Rad Monitor Ch 11 is INOP Page 17 of 28 NRC Scenario 3 March 2015
=~Exelon Generation Event #4: RBCLC Temperature Control Valve Failure
- Crew responds per N1-SOP-11.1 As directed by lead examiner, insert malfunction: CREW
- Diagnose failure of RBCLC automatic FV=minimum cooling temperature control TRG2 TCV 70-137 closes and bypass opens RBCLC water temperature rises Temperatures of components cooled by RBCLC rise Expected Annunciator:
H1-4-1, R BUILDING COOLING WATER PRESS TEMP MAKEUP FLOW (-4.5 minutes)
- Directs execution of ARP H 1-4-1
- May direct entry into SOP-11.1, RBCLC Failure
- Monitor plant parameters
Exelon Generation Event 4 continued BOP
- Executes ARP H1-4-1 Note:
- Monitors equipment cooled by RBCLC controller prior to the annunciator alarming, and may
- Places RBCLC Temperature Controller 70-238 in take manual control without referencing the ARP. manual (N1-0P-11, Section H.13 may be referenced)
- Depress the AIM Button until red LED is illuminated next to "M"
- Manually adjust RBCLC Temperature Controller to maintain RBCLC temp between 57°F and 95°F Page 19 of 28 NRC Scenario 3 March 2015
Exelon Generation Event #5: RPS MG Set 141 Trip
- RPS MG Set 141 trips causing a half scram on RPS 12.
As directed by the examiner, insert malfunction: CREW
- Recognize/report RPS 12 half scram RP01 B, Reactor Trip Bus Motor Generator Trips 141
- Diagnose trip of RPS MG set 141 TRG4 Scram solenoid lights for RPS 12 de-energize SRO Feedwater temperature slowly lowers Reactor power slowly rises
- Acknowledges reports Expected annunciators: (Immediate)
- Directs execution of ARP F4-3-2 F4-3-2, RX. TRIP BUS M-G SET 141 TROUBLE F4-3-8, RPS CH 12 MAN REACTOR TRIP
- Directs entry into OP-48, H.5 F4-2-8, RPS CH 12 AUTO REACTOR TRIP
- Directs entry into SOP-16.1 for loss of Feedwater heating
- May direct emergency power reduction per SOP-1.1 if needed to control Feedwater temperatures or Reactor power
- Provides oversight of reactivity changes RO
- Monitors plant parameters
- Lowers power per SOP-1.1 as required to control Feedwater temperatures or Reactor power
- Resets half scram Role Play: When dispatched as operator to BOP investigate problem with MG Set 141, wait two minutes then report that you can smell burnt
- Executes ARP F4-3-2 insulation in the vicinity of MG Set 141 motor. Report
- Dispatches an operator to investigate MG Set that the drive motor breaker tripped on overcurrent. If 141 asked, report no overvoltage trip occurred.
- Determines I & C Bus 130A is available
- Obtains SRO permission to perform dead bus transfer of Reactor Trip Bus 141 Page 20 of 28 NRC Scenario 3 March 2015
Exelon Generation Event 5 Continued BOP Continued Role Play: When dispatched as operator to transfer
- Dispatches an operator to perform dead bus Reactor Trip Bus 141 to l&C Bus 130A, wait 2 transfer of Reactor Trip Bus 141 per OP-48 minutes and insert remote: section H.5.0 RP02, Rx Trip Bus 141 Pwr Source, FV=maint
- Enters SOP-16.1 due to loss of Feedwater TRG27 heating
- Monitors Feedwater temperatures Then report Reactor Trip Bus 141 has been re-
- Acknowledges that Reactor Trip Bus 141 is re-energized from l&C Bus 130A, and that half scram energized and Feedwater heaters can be reset.
- Coordinates with RO to reset half scram
- Dispatches operator to reset Feedwater heaters Role Play: When dispatched as operator to reset Feedwater heaters, wait 2 minutes and insert remotes:
MS05, FW Htr String 12 Reset, FV=reset MS02, HP FW Htr 125 Reset, FV=reset TRG 30 Then report 12 Feedwater heaters have been reset.
Page 21 of 28 NRC Scenario 3 March 2015
Exelon Generation Event #6: Instrument Air Leak
As directed by lead examiner, insert malfunctions: CREW
- Recognizes/reports lowering instrument air RD34, Loss of CRD Instrument Air Pres, RT=5:00, pressure FV=20 IA01, Loss of Instrument Air, RT=5:00, FV=40
- Observes start of standby IAC TRG6 Instrument air pressure lowers SRO Backup Instrument Air Compressor (/AC) loads Standby Instrument Air Compressor (/AC) starts
- Acknowledges reports CRD air pressure lowers - Reaches 60# at -4 minutes
- Directs execution of ARP F3-3-2 Expected Annunciators:
L1-4-7, INST AIR BACK-UP VALVE OPEN
- May direct entry into SOP-20.1 F3-3-2, CRD CONTROL AIR PRESSURE HI-LO (-2 min)
- May direct execution of ARP L 1-4-7
- Acknowledges CRD air pressure < 60 psig
- Directs manual Reactor scram (CT-1.0)
- Monitors plant parameters
- Places Mode Switch in SHUTDOWN (CT-1.0)
- Provides scram report BOP Role Play: When directed as operator check for air leaks, acknowledge order. Wait 2 minutes and report
- Executes ARP F3-3-2 air leakage on Reactor Building 237' West, near the
- Dispatches Operator to check for air leaks
- Monitors CRD air pressure
- Reports when CRD air pressure lowers below 60 psig Page 22 of 28 NRC Scenario 3 March 2015
/11811r Exelon Generation Events #7 and #8: ATWS with Failure of FW Isolation Valves to Isolate
- Crew responds per N1-EOP-3 Verify the following malfunctions are preset: CREW RD33A, Control Rod Bank Blocked Bank 1, FV=12
- Diagnose failure of control rods to insert RD33B, Control Rod Bank Blocked Bank 2, FV=12 RD33C, Control Rod Bank Blocked Bank 3, FV=18
- Diagnose Reactor power above 6%
RD33D, Control Rod Bank Blocked Bank 4, FV=12 RD33E, Control Rod Bank Blocked Bank 5, FV=12 Control rods partially insert Reactor power remains > 6%
- Answers "Are all rods inserted to at least position 04?" NO
- Answers "Will the reactor stay shutdown without boron?" NO
- Exits EOP-2, enters EOP-3, Failure to Scram
- Directs ADS bypassed
- Directs prevention of Core Spray injection per EOP-1 att 4
- May enter EOP-4 on high torus temperature
- Directs lockout of Containment Spray pumps except pump(s) used for torus cooling Page 23 of 28 NRC Scenario 3 March 2015
=::"Exelon Generation Events 7 and 8 continued SRO Continued EOP-3 Level Leg Actions:
- Determines Reactor power is above 6% and RPV water level is above -41 inches
- Directs RPV level lowered to at least -41 inches
- Directs RPV water level controlled -109 to -41 inches with Condensate/FW and CRD EOP-3 Pressure Leg Actions:
- If any ERV is cycling:
- Directs initiation of Emergency Condensers
- Monitors Figure M, Heat Capacity Temperature Limit Page 24 of 28 NRC Scenario 3 March 2015
_..,.. Exelon Generation Events 7 and 8 continued SRO continued EOP-3 Power Leg Actions:
- Directs initiation of ARI
- Answers "Is the Turbine Generator On-line?" NO
- Answers "Reactor power?" Above 6%
- Directs Recirc pumps verified tripped
- Directs execution of EOP-3.1, Alternate Rod Insertion (CT-3.0)
- If power is oscillating more than 25% or before Torus temperature reaches 110°F:
- Records Liquid Poison tank level
- Directs Liquid Poison injection (CT-3.0)
- Acknowledges first Liquid Poison pump injecting RO
- Depresses RPS pushbuttons
- Initiates ARI
- Bypasses Core Spray IV interlocks per N1-EOP-1 Att4 by installing six jumpers (17, 18, 19, 24, 25,
- 26) inside Panel N
- Bypasses low-low RPV water level MSIV isolation per EOP-1 att 2 by installing four jumpers (1, 2, 8,
- 9) inside Panel N
- Performs EOP-3. 1, Section 3 (driving rods) and/or 4 (manual scrams) (see actions below)
- Inserts SRMs
- Inserts IRMs
- Controls IRM recorders and range switches as required to monitor power
- Reports when APRMs are < 6%
- Reports status of control rod insertion Page 25 of 28 NRC Scenario 3 March 2015
Events 7 and 8 continued RO Continued Possible EOP-3.1 Section 3 Actions:
- Verify a CRD Pump running Note: Control rods will successfully insert using
- Place Reactor Mode Switch in REFUEL RMCS.
- Place ARI OVERRIDE switch in OVERRIDE
- Installed RPS jumpers (5, 6, 12, 13)
Note: RO will likely have to fully open the CRD flow
- Reset the scram control valve and/or close 44-04 in order to achieve
- Insert rods to 00 using EMER ROD IN starting rod movement via RMCS; these methods are with high power regions of core (use LPRM preferential to closing 44-167 due to ability to perform indications) (CT-3.0) from the control room and not preventing further
- If more drive pressure is required, then perform scram attempts by blocking the charging water one of more of the following:
- Fully open CRD Flow Control Valve (F panel)
- Close 44-04, Control Rod Drive Water Cont V (F Panel)
- Close 44-167, Charging Water Header Note: When ARI is overridden, the scram is reset, Blocking Valve (RB 237')
and annunciator F4-1-1 clears, then TRG 20 will activate. Verify this occurs and the RD33 malfunctions all delete. This allows all control rods Possible EOP-3.1 Section 4 Actions:
to insert on the next manual scram attempt.
- Place ARI OVERRIDE switch in OVERRIDE
- Installed RPS jumpers (5, 6, 12, 13)
As directed by the examiner, if it's desired to 'time
- Verify open 44-167, Charging Water Header fail off appropriate annunciators and insert TRG 20 Blocking Valve (RB 237')
to remove A TWS malfunctions all AFTER verifying
- When the SDV is drained, then initiate a the scram is reset. manual scram (CT-3.0)
Page 26 of 28 NRC Scenario 3 March 2015
~p Exelon Generation Events 7 and 8 continued BOP
- Bypasses ADS
- Attempts to close both FEEDWATER Role Play: When directed as PO to pull HPCI fuses ISOLATION Valves 11 and 12 FU-8 and FU-9, wait one minute and insert remote:
FW24, Removal of HPCI Fuses FU8/FU9,
- Selects Manual on 11, 12 and 13 FWP Valve FV=pulled Control selector switches TRG23
- Closes 11, 12 and 13 Feedwater FCV (Knurled Knob) full counterclockwise Then report that HPCI fuses FU-8 and FU-9 have
- Directs PO to remove fuses FU-8 and FU-9 been pulled from Panel IS34 in the Aux Control Room
- Verifies closed, FEEDWATER PUMP 13 BLOCKING VALVE
- Verifies in MAN, FWP 11 BYPASS VALVE, AND set to zero output
- Verifies in MAN, FWP 12 BYPASS VALVE, AND set to zero output
=~Exelon Generation Copy of __
Training Id: NRC 2015 Scenario 4 Revision: 0.0 Restore RRP to Service, Loss of Reactor Building Ventilation, RRMG M/ A Station Failure, Steam Line Break in the Drywell, Failure of
Title:
HPCI, Containment Spray Pump Trip Signature I Printed Name Developed By ~~Paul Isham 6/2/14 Validated By Pat O'Brien 8/20/14 Leigh Mason 8/20/14 Dave Ballard 8/20/14 Facility Reviewer Greg Elkins Page 1 of 25 NRC Scenario 4 March 2015
_.,,..,. Exelon Generation References N1-0P-1, Nuclear Steam Supply System N1-0P-43B, Normal Power Operations N1-0P-10, Reactor Building Heating, Cooling, and Ventilation System N1-SOP-1.3, Recirc Pump Trip at Power N 1-SOP-1 , Reactor Scram N1-EOP-2, RPV Control N1-EOP-4, Primary Containment Control N 1-EOP-5, Secondary Containment Control N1-EOP-1, NMP1 EOP Support Procedure N1-EOP-8, RPV Slowdown Unit 1 Technical Specifications Page 2 of 25 NRC Scenario 4 March 2015
Exelon Generation Instructor Information A. Scenario Description Sequence of Events I Expected Crew Response:
The crew assumes the shift with the plant operating at 90% power and four recirculation loops in service.
Containment Spray pump 112 and Reactor Building Exhaust Fan 12 are out of service for maintenance.
Immediately after assuming the shift the crew will be directed to restore Recirculation Pump 11 to service and return to full power. The crew will assess plant conditions and lower power with Recirculation Flow until flow is less than 50 Mlbm/hr. They will then return Recirculation Pump 11 to service.
After the crew has placed the recirc pump in service, #11 RB exhaust fan will trip. The crew will diagnose the fan trip and a positive RB pressure. With #12 RB exhaust fan OOS, the crew will start the Reactor Building Emergency Ventilation System (RBEVS) to restore a negative RB pressure. Entry into N1-EOP-5, Secondary Containment Control is required. SRO determines the secondary containment TS is still satisfied.
Next, RRP 15 flow rises due to a blind controller failure. The crew will take the M/A station to manual, and the rise will stop. RRMG 15 will develop a high slot temperature, requiring the crew to remove it from service.
A steam leak will then develop in the Primary Containment. The crew will insert a scram. Following the scram, HPCI will fail to initiate, requiring manual action to establish injection with preferred and/or alternate injection systems to maintain RPV water level (Critical Task).
When the crew attempts to spray the Containment, Containment Spray pump 111 will trip. The two remaining Containment Spray pumps will be insufficient to avoid violating PSP, and the crew will perform an RPV Blowdown (Critical Task).
- 1. Termination Criteria
- a. RPV water level controlled in assigned band, RPV Blowdown in progress, Primary Containment pressure controlled per N1-EOP-1 attachment 17 Page 3 of 25 NRC Scenario 4 March 2015
Exelon Generation
- 2. Critical Tasks CT-1, Given a LOCA in the Drywell and a failure of HPCI to initiate, the crew will inject with preferred and alternate injection systems to restore and maintain RPV water level above -84 inches, in accordance with N1-EOP-2 Justification:
Safety Significance: Maintaining Reactor water level above -84 inches ensures adequate core cooling through the preferred method of core submergence. This protects the integrity of the fuel cladding.
Cueing: Multiple Reactor water level indicators and annunciators will provide indications of lowering Reactor water level.
N1-EOP-2 provides multiple procedure steps directing injection with preferred and alternate injection systems.
Measurable Performance Indicators: Manipulation of pumps and/or valves in the preferred or alternate injection system(s) will provide observable actions for the evaluation team.
Performance Feedback: Multiple Reactor water level indicators and annunciators will provide performance feedback regarding the success of injection with preferred and alternate injection systems.
CT-2, Given a LOCA in the Drywell and degraded Containment Spray capability, the crew will execute N1-EOP-8, RPV Slowdown, when it is determined Torus pressure cannot be maintained below the Pressure Suppression Pressure limit, in accordance with N1-EOP-4.
Justification:
Safety Significance: A Blowdown is required to limit further release of energy into the Primary Containment and to ensure that the RPV is depressurized while pressure suppression capability is still available. This protects the integrity of the Primary Containment.
Cueing: Multiple Primary Containment pressure indicators and annunciators will provide indications. N1-EOP-4 provides direction to monitor the Pressure Suppression Pressure limit and blowdown if required.
Measurable Performance Indicators: The crew will manually open valves to initiate Emergency Condensers. The crew will manually open ERVs.
Performance Feedback: Emergency Condenser and ERV instrumentation will provide indication that these systems are functioning properly once placed in service. Multiple Reactor pressure indicators and annunciators will provide performance feedback regarding the success of the blowdown.
- 3. Length
- a. -60 minutes Page 4 of 25 NRC Scenario 4 March 2015
Exelon Generation
- 4. Mitigation Strategy Code
- 5. Technical Specifications
- a. TS 3.2.5
- b. TS 3.6.2 Tables a and g
- c. TS 3.1.7.e
- 6. EAL Classification
- 7. Special Orders
- a. None Page 5 of 25 NRC Scenario 4 March 2015
~ Exelon Generation B. Initial Conditions
- 1. IC Number
- a. IC-154
- 2. Presets I With Triggers
- a. Malfunctions
- 1) CT01 B, CT Pump 112 Trip Inserted
- 2) HV01 B, Reactor Building Exhaust Fan Trip 12 Inserted
- 3) HV01A, Reactor Building Exhaust Fan Trip 11 TRG 1
- 4) RR65E, RR Pump 15 Blind Controller Input Signal Failure, FV=95, RT=5min TRG2
- 6) EC01, Steam Supply Line Break in PC, FV=11 TRG5
- 7) PC10A, BV 68-01 Fails Open TRG 23
- 8) PC10C, BV 68-03 Fails Open TRG 23
- 9) FW28A, HPCI MODE: FWP 11 AUTO-START FAIL Inserted
- 10) FW288, HPCI MODE: FWP 12 AUTO-START FAIL Inserted
- 11) CT01A, CT Pump 111 Trip Inserted
- 12) CS07, CS Injection Valves Failure to Auto Open Inserted
- b. Remotes 1)
- c. Overrides None
- d. Annunciators None Page 6 of 25 NRC Scenario 4 March 2015
Exelon Generation
- e. Event Triggers TRG 3, Initiates when RRP 15 M/A station is taken to zdrrmam(5)==1 Blank manual to initiate slot temperature rise.
TRG 22, Initiates when RRP 15 M/A station is taken to zdrrmam(5)==1 dmf rr65e manual to delete M/A station oscillations TRG 23, Initiated when Mode Switch is taken to zdrpstdn==1 imf ec01 (0 0) 30 4:00 11 Shutdown to increase the size of the leak.
TRG 24, Initiates when Containment Spray flow is ctfdw>100 imf ec01 (0 0) 45 1:00 30 initiated to increase size of the leak.
TRG 25, Delete slot temperature rise malfunction when zdrrmgpl(5)==1 dmf rr09e the recirc pump is secured.
- f. Equipment Out of Service
- 1) Containment Spray Pump 112 in PTL with yellow tag
- 2) Containment Spray suction isolation valve 112 closed with yellow tag
- 3) Reactor Build Exhaust Fan 12 secured with yellow tag
- 4) Recirc Pump 11 secured, ready for start
- g. Support Documentation
- 1) N1-0P-1 marked up through step H.4.4
- 2) N1-0P-43B marked up through step 2.6
- 3) RMI for lowering recirc flow to 50 Mlbm/hr
- h. Miscellaneous
- 1) Protect the following equipment: EDG 103, PB 103
- 2) Update Divisional Status Board
- 3) Ensure LPRM downscale pushbuttons are depressed on rod block monitor
- 4) DW Cooling Fan 11 Secured Page 7 of 25 NRC Scenario 4 March 2015
=~Exelon Generation SHIFT TURNOVER INFORMATION ON COMING SHIFT: . I N ID DATE: _T_o_d_ay~--
PARTI: To be performed by the oncoming Operator before assuming the shift.
PART II: To be reviewed by the oncoming Operator before assuming the shift.
- LCO Status (SRO)
- Shift Turnover Information Sheet Evolutions/General Information/Equipment Status:
- Reactor power is approximately 90%.
- Containment Spray pump 112 is out of service for maintenance (Day 1 of planned 2 day window; 15 day LCO per TS 3.3.7.b).
- Reactor Building Exhaust Fan 12 is out of service for maintenance.
- RRP 11 removed from service for repairs and is ready to be returned to service. TS 3.1. 7.e. Four loop operation.
PART Ill: Remarks/Planned Evolutions:
- Start RRP 11 per N1-0P-1, H.4.0, and return to five-loop operation. N1-0P-1, H.4.0, signed off up to step H.4.5. N1-0P-43B signed off up to step 2.7.
- Reactor power is at 90% and must be lowered until recirc flow <50 Mlbm/hr to support starting RRP 11.
- After starting Recirc Pump 11 MG set, operate it on the master flow controller for one hour while maintenance takes readings before returning to 100% power.
Page 8 of 25 NRC Scenario 4 March 2015
~ Exelon Generation ATTACHMENT 2: REACTIVITY MANEUVER INSTRUCTION Reactivity Maneuver: Recirc Pump Restoration Step: 1 I INITIAL CONDITIONS/STEP DESCRIPTION
./
I RE presence required in the Control Room? Yes_ No If YES above, RE presence not required for steps_.
Initial conditions to be verified prior to initiation of step:
Parameter Expected Range Actual Parameter Expected Range Actual Recirc Flow 51-54 Mlbm/hr Description of Step:
- 1. Lower recirculation flow to 49-50 Mlbm/hr.
- 2. Start 11 RRP per N1-0P-1
- 3. Raise reactor Power to 98% with recirc flow
- 4. Raise reactor Power to 100% with recirc flow over one hour Critical parameters to be monitored DURING Step:
Critical parameters not used must be deleted OR marked N/A Critical Parameter Limit Owner Frequency Contingency CTP 1850 MWth RO Continuous Lower recirculation flow or insert cram rods RMI evaluated against approved power profile:* N/A D.
Other Comments:
After Starting recirc pump 11 MG set and placing it on the master controller, operate it for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> prior to returning to 100% power.
Step Prepared by: Alex Reed I Today Step Reviewed by: Jack Dean I Today RE/STA Date RE/STA/SRO Date Approval to perform Step John Aaron I Today Step Completed by: I Shift Manager Date SRO Date Page 9 of 25 NRC Scenario 4 March 2015
=::"Exelon Generation Shift Turnover Take the Simulator out of freeze before the crew enters for the pre-shift walkdown.
- Verify annunciator sound turned on
- If recording scenario, start the recording device during the pre-shift walkdown Allow no more than 5 minutes to walkdown the Crew panels.
- Walkdown panels
- Conduct shift turnover brief
- Assume the shift Page 10 of 25 NRC Scenario 4 March 2015
__.,. Exelon Generation Event #1: Power Reduction with Recirc Flow for RRP Restoration
- The crew will reduce reactor power with recirc flow in order to restore recirc pump 11 to service following repairs SRO Note: Reactivity brief and procedure review will be
- Directs RO to lower core flow to <50 Mlbm/hr conducted prior to the crew entering the simulator. IAWRMI
- Supervises reactivity maneuver RO
- Reduces recirc flow IAW RMI
- Continuously observes the following:
- APRMs lowering
- Recirc flow lowering
- Steam and feedwater flow lowering
- Vessel level normal
- Lower recirc flow until <50 Mlbm/hr
- Report when recirc flow is <50 Mlbm/hr BOP
- Monitors individual RRP for response
- Individual MIA-Speed Control stations trending uniformly
- Individual RRP indications trending normally for lowering speed
- Monitors feed water controls for proper response
- FWP 13 FCV responding to power change
- RPV Water Level remains within program band (65" - 83")
Page 11 of 25 NRC Scenario 4 March 2015
=~Exelon Generation
- The plant is operating in 4 loop operation
- The crew will restore RRP 11 to service Note: Crew directed to start RRP 11 in pre-brief, SRO starting at N1-0P-1, step H.4.5.
- Direct start up of RRP 11, using N 1-0P-1, starting at step H.4.5
- Supervise reactivity manipulation
- Acknowledge report that RRP 11 is in service
- Continuously observe the following:
- APR Ms
- Recirc flow
- Monitor P/F map and transfer from 4 loop to 5 loop map when the startup is performed Page 12 of 25 NRC Scenario 4 March 2015
Exelon Generation Event 2 Continued BOP
- Verify recirculation flow < 50 x 106 lb/hr
- Verify RRP 11 GEMAC in MAN and matched with other four GEMACs but no greater than 50%
- Verify RRP 11 discharge valve closed
- Verify RRP 11 suction and discharge bypass valves are open CAUTIONS from N1-0P-1
- Make a plant announcement for start of RRP 11
- Failure to raise Recirc Pump speed during
- Place RRP 11 control switch to START and opening of discharge valve may result in stalled observe indications rotor and pump trip due to reverse flow.
- MG MOTOR starts, Amp Meter Amps increase then decrease
- MG Generator accelerates to proper speed lowers to 20 Hz. Frequency will raise, then drop (approx 50 - 60 Hz) quickly, then raise again before SLOWLY
- Generator Field Bkr closes lowering. Discharge BV should be opened when
- Generator slows toward 20% speed frequency is slowly lowering.
(Approximately 11.5 Hz)
- WHEN speed (Frequency Meter) is between 30 and 25 Hz, open REACTOR R PUMP DISCH VALVE
- Verify RRP 11 maintained less than or equal to OP limits
- Adjust pump speed to match other pumps Role Play: As PO sent to Aux Control Room, wait
- Null RRP 11 controller and shift to BAL or AUTO one minute then report you have reset 50SR Pump Motor Stalled Rotor Target
- Verify power/flow map updated to five loop requirements
- Dispatch PO to reset 50SR Pump Motor Stalled Role Play: As PO, when requested report MG set oil Rotor Target (Aux Control Room) temperature is 120°F and stable.
- Dispatch PO to check MG set oil temperature locally
- May perform N 1-ARP-F2-1-1 action to depress PUMP MOTOR VIBRATION RESET pushbutton on F Panel, clearing annunciator F2-1-1 Page 13 of 25 NRC Scenario 4 March 2015
Exelon Generation Event #3: Loss of Normal Reactor Building Ventilation
- The crew will need to re-establish negative RB DIP with RBEVS As directed by lead examiner, insert malfunction: CREW
- Recognize/report L 1-3-4, REACT BLDG/ATM HV01A, Reactor Building Exhaust Fan Trip 11 DIFF PRESS, in alarm.
TRG 1
- Recognize/report exhaust fan 11 tripped .
L1-1-5, RB VENT EXH FAN 11-12 TRIP-V/B SRO L 1-2-4, RB VENT SUP SYSTEM L 1-2-5, RB VENT EXH FLOW LOW
- Acknowledge report L1-3-4, REACT BLDG/ATM L 1-3-4, REACT BLDG/ATM DIFF PRESS DIFF PRESS, in alarm.
RB dP drops to O"
- Acknowledge report exhaust fan 11 tripped .
- Direct actions of L1-3-4andL1-1-5 to be performed.
- Acknowledge reactor building negative pressure is degraded low.
- Recognize entry condition for N1-EOP-5, Secondary Containment Control.
- Determine no emergency exists (activation of emergency plan not required).
- i. Per SC-3, ensure RBEVS started and RB ventilation isolated
- Determine that with the reactor building isolated and RBEVS running and maintaining reactor building negative pressure within the limit, entry into Tech Spec actions for Secondary Containment IS NOT REQUIRED.
0 TS 3.4.2 and TS 3.4.4 requirements are met Page 14 of 25 NRC Scenario 4 March 2015
Exelon Generation Event 3 Continued BOP
- Acknowledge direction to perform actions of L1-3-4, L1-1-5
- Monitor Reactor Building DIP
- Inform SRO D/P is zero
- Start RBEVS per N1-0P-10 o Verify open 202-36, EM VENTILATION FROM REACTOR BLDG BV o Verify closed 202-47, EM VENTILATION TIE BV o Verify closed 202-74, EM VENTILATION LOOP 11 COOLING BV o Verify closed 202-75, EM VENTILATION LOOP 12 COOLING BV If starting RBEVS 11
- Start 202-53, EVS FAN 11
- Verify open 202-34, EM VENT EXHAUST FAN 11 OUTLET BV
- Confirm proper operation of 202-50, EM VENT EXHAUST FAN 11 INLET FCV, by observing flow indication and Rx Bldg DP If starting RBEVS 12
- Start 202-33, EVS FAN 12
- Verify open 202-35, EM VENT EXHAUST FAN 12 OUTLET BV
- Confirm proper operation of 202-51, EM VENT EXHAUST FAN 12 INLET FCV, by observing flow and Rx Bldg DP Page 15 of 25 NRC Scenario 4 March 2015
=~Exelon Generation Event 3 Continued BOP Continued
- Isolate reactor building ventilation per N1-0P-10 o Place REACTOR BLDG SUPPLY FANS 11and12 in OFF o Place REACTOR BLDG EXHAUST FANS 11 and 12 in OFF o Place control switch for 202-31, REACTOR BLDG EXHAUST ISOLATION VALVE 12 and 202-32, REACTOR BLDG EXHAUST ISOLATION VALVE 11 in CLOSE o Place control switch for 202-15, REACTOR BLDG SUPPLY ISOLATION VALVE 11 and 202-16, REACTOR BLDG SUPPLY ISOLATION VALVE 12 in CLOSE
- Report RBEVS in service and reactor building ventilation isolated Page 16 of 25 NRC Scenario 4 March 2015
Exelon Generation Event #4: Recirc Pump 15 M/A Failure and High Temperature Trip
- The plant is operating with 5 recirc loops in service at less than rated power.
- RRP15 flow rises due to a blind controller failure, but stops when placed in Manual
- RRP15 runs a high slot temperature and must be tripped As directed by lead examiner, insert malfunction: CREW RR65E, RR Pump 15 Blind Controller Input Signal
- Diagnose/report Recirc pump 15 parameters are Failure, FV=95, RT=5min elevated.
TRG2 APRMs, MWth, MWe, all rise SRO
- Acknowledges report of power rising
- May direct entry into N1-SOP-1.5
- May direct entry into N1-0P-1, Sect H for Recirculation System Failures
- Directs taking manual control of RR Pump 15 M/A station
- Monitors plant parameters BOP
- Recognizes and reports RR Pump 15 controller rising
- Nulls deviation meter on RR Pump 15 (may reference N1-0P-1, Sect. F.1.0)
- Places RR Pump 15 MIA station in MAN
- Verifies failure stops
- Notifies SRO/Crew that RR Pump 15 is in manual and that the malfunction has stopped Page 17 of 25 NRC Scenario 4 March 2015
=~Exelon Generation Verify the following malfunction is automatically CREW inserted when the RRP 15 MIA station is taken to
- Acknowledge/report Annunciator F2-2-5 MAN:
- Observe computer points A 130 and 8399 in alarm RR09E, RR Pump 15 MG Slot Temperature Increase, DT=30sec, RT=10:00, FV=60 TRG3 Expected Annunciator:
F2-2-5, REACT REC/RC MG SET 15 -6 min Expected Computer Points:
8399 RRMG 15 GEN SLOT TEMP C - 5min A130 RRMG 15 GEN SLOT TEMP HIGH-6 min 8404 RRP 15 MTR Slot Temp High SRO Note: If the crew does not take action to secure the
- Acknowledges RRMG 15 high slot temperature pump after a reasonable time trip RR Pump 15 by
- Directs execution of ARP F2-2-5 inserting malfunction RR01 E.
- Directs a reactor power reduction
- Provides oversight of reactivity manipulation Note: N1-0P-1 directs lowering power per N1-0P-
- May direct a trip of RR Pump 15 and entry into 438. However, due to the emergent nature of this N1-SOP-1.3 event, the crew will likely lower power using the guidance of N 1-SOP-1.1, Emergency Power
- May direct entry into N1-SOP-1.5 after the trip Reduction.
- May direct removing RR Pump 15 from service using N1-0P-1, Sect H.1.0 Role Play: If contacted as the Ops Director regarding
- Enter T.S. 3.6.2 for inoperable APRMs while RR the high temperature, direct the crew to remove the Pump 15 Discharge Valve is open if the pump is MG Set from service. tripped
- Enters T.S. 3.1.7.e for partial loop operation RO
- Monitors plant parameters
- When directed, lowers power with recirculation flow
- Verifies P/F Map updated for 4 loop operation
- Lowers Recirc flow as necessary to remain within flow limits for 4 loop operation
- Monitors plant limits for 4 loop operation Page 18 of 25 NRC Scenario 4 March 2015
=:r-Exelon Generation BOP
- Enters ARP F2-2-5 Role Play: If requested to check Turbine Building
- Enters N1-0P-1, Sect F.4 Ventilation and MG Set Ventilation, wait 3 minutes,
- Dispatches operator to verify proper operation of MG Set Area Ventilation, TB Track Bay AND Roll then report that everything is normal with the door position(s), and MG Set Area Coolers.
ventilation. Report that the generator end of RRMG
- Verifies Reactor Recirc Pump parameters are 15 is very hot to the touch. within the following limits:
- Generator Amps 240 A
- RRP Flow 16.8 X 106 lbm/hr
- Generator Frequency 11.5 Hz to 56 Hz
- Verifies total recirculation flow is evenly balanced between all operating RRPs
- When Generator slot temperature continues to rise and approaches or exceeds 120°C, reduces Note: N1-0P-1 directs lowering power per N1-0P- loading on affected RRMG by lowering power per N1-0P-43B 43B. However, due to the emergent nature of this If directed to trip RR Pump 15:
event, the crew will likely lower power using the
- Enters N1-SOP-1.3
- Holds Discharge Valve in OPEN position for delete RR09E when the recirc pump is tripped. 2 to 3 seconds
- Records time
- Notifies SRO the APRMs are operable If directed, removes RR Pump 15 from service using N1-0P-1, Sect H.1
- Verifies open RR Pump 15 Bypass Valve 6
- Lowers flow on RR Pump 15 to 6 to 8 x 10 lbm/hr
- Closes RR Pump 15 Discharge Valve
- Holds Discharge Valve in OPEN position for 2 to 3 seconds Page 19 of 25 NRC Scenario 4 March 2015
Exelon Generation Events #5, #6, #7, and #8: Steam Leak Inside Drywell, Vacuum Breaker Fails Open, Failure of HPCI and Core Spray to Initiate, Trip of Containment Spray Pump 111
- EC Steam line Break in the Drywell with multiple system failures When directed by the lead examiner, insert CREW malfunction:
- Diagnose/report degrading containment EC01, Steam Supply Line Break in PC, FV=11 parameters TRG5
- Acknowledge/report annunciators Drywel/ humidity, pressure and temperature rise
- Diagnose failure of HPCI to automatically initiate Drywel/ /eakage rises Expected annunciators:
- Diagnose the trip of Containment Spray pump H2-1-1, Drywell Floor Drain Level High 111 H2-4-7, Drywel/ Water Leak Detection Sys K2-4-3, Drywell Pressure High-Low F1-1-5(4-1-4), RPS Ch 11(12) Drywel/ Press High Verify the following malfunctions are preset:
FW28A, HPCI Mode Failure to Initiate 11 FW28B, HPCI Mode Failure to Initiate 12 CT01A, CT Pump 111 Trip CS07, CS Injection Valves Failure to Auto Open RPV water level slowly lowering Containment Spray pump 111 red light off, green light on and amps go to zero Core Spray /Vs do NOT open at 365 psig Expected annunciator:
K1-1-7, Containment Spray Pump 111 Trip Failto Run Page 20 of 25 NRC Scenario 4 March 2015
Exelon Generation Events 5, 6, 7, and 8 continued SRO
- Acknowledges reports
- Directs manual scram Verify the following malfunctions automatically insert when the mode switch is taken to
- Acknowledges scram report SHUTDOWN:
- Enters N 1-EOP-2 on low RPV water level
- Directs N1-SOP-1 actions EC01, Steam Supply Line Break in PC, IV=11, RT=4:00, FV=30
- Directs RPV water level controlled 53-95" with PC10A, BV 68-01 Fails Open Condensate/FW and CRD PC10C, BV 68-03 Fails Open
- When notified of the failure of HPCI to initiate, TRG23 Containment conditions further degrade directs manual control of Feedwater Two Torus-to-Drywel/ vacuum breakers indicate open (preferred and alternate injection systems)
Expected annunciator:
K1-4-6, Torus-OW Vac Relief Check Valve Open CT-1
- Directs RPV pressure controlled 800-1000 psig with Turbine Bypass Valves (if available) or Emergency Condensers
- May direct closure of MSIVs to limit cooldown rate
- Enters N1-EOP-4 due to high drywell pressure and temperature Verify the following malfunction automatically inserts when Containment Spray flow is initiated to o Direct lockout of Containment Spray pumps the Drywell:
- Re-enters N1-EOP-2 due to high drywell pressure and low RPV water level EC01, Steam Supply Line Break in PC, IV=30, RT=1 :00, FV=45 TRG24 Page 21 of 25 NRC Scenario 4 March 2015
Exelon Generation Events 5, 6, 7, and 8 continued SRO continued
- When torus pressure exceeds 13 psig or drywell temperature approaches 300°F:
- Answers "Below the Containment Spray Initiation Limit?" - Yes
- Verifies all Recirc pumps tripped
- Directs trip of all Drywell cooling fans
- Directs operation of Containment Spray per EOP-1 attachment 17
- Evaluates/monitors position on Pressure Suppression Pressure curve Role Play: If directed to perform in-plant actions to
- Acknowledges report of Containment Spray line up Containment Spray Raw Water to pump 111 trip Containment Spray, acknowledge order, but delay
- May direct rapid depressurization with ECs in any field actions.
anticipation of RPV Slowdown
- Determines Torus pressure cannot be maintained within Pressure Suppression Pressure limit
- Enters N1-EOP-8, RPV Slowdown CT-2
- Answers "Are all control rods inserted to at least 04?" YES
- Answers "Drywell pressure?" At or above 3.5 psig Note: Core Spray injection will only be prevented if
- May direct prevention of Core Spray injection not needed for core cooling. If the crew has not yet per EOP-1 attachment 4 re-established RPV injection when this step is
- Directs EC initiation evaluated, the Core Spray jumpers may not be
- Answers "Torus water level?" Above 8.0 ft installed until later. N1-EOP-2 step P-1 provides
- Directs open 4 ERVs continuous guidance for this consideration.
Page 22 of 25 NRC Scenario 4 March 2015
=~Exelon Generation Events 5, 6, 7, and 8 continued RO
- Monitors plant parameters
- When directed, places Mode Switch in Shutdown
- Provides scram report
- Places I RMs on range 9
- Down-ranges IRMs as necessary to monitor power decrease
- If recirc pumps have not yet tripped, reduces recirc flow to 25-43 Mlbm/hr
- Maintains RPV pressure below 1080 psig and in assigned band Page 23 of 25 NRC Scenario 4 March 2015
=~Exelon Generation Events 5, 6, 7, and 8 continued BOP
- Monitors/reports degrading Containment parameters
- Performs RPV water level control actions of SOP-1, Reactor Scram:
Note: Feedwater level control actions will vary
- Restores RPV level to 53-95" by controlling depending on when the operator diagnoses the injection and rejecting through RWCU failure of HPCI to automatically control injection
- Starts 11 or 12 MDFWP through Feedwater flow control valves 11 and 12.
- Determines RPV water level is recovering
- Terminates 13 FWP injection as follows:
- Closes 13 FWP VALVE CONTROL
- Disengages 13 FWP
- Closes 29-10, Feedwater Pump 13 Blocking Valve
- Verifies RPV water level above 53"
- Verifies 11/12 FWP controllers in MANUAL and set to zero output
- Places FWP BYPASS Valve 11 or 12 in AUTO, sets to 65-70 inches
- If RPV level reaches 85 inches and rising, then:
- Verifies off all FW Pumps
- Secures CRD Pumps not required
- Diagnoses failure of HPCI to automatically initiate
- Notifies SRO/Crew of HPCI failure
- Manually controls RPV injection to restore and maintain level CT-1 Page 24 of 25 NRC Scenario 4 March 2015
Events 7, 8, and 9 continued RO/BOP
- Places Containment Spray pumps in PTL
- Closes MSIVs, as directed
- Reports when Torus pressure exceeds 13 psig or Drywell temperature approaches 300°F
- Verifies Recirc pumps tripped
- Trips Drywell cooling fans
- Initiates Containment Spray per N1-EOP-1 attachment 17
- Diagnoses/reports Containment Spray pump Note: Core Spray pumps may be placed in PTL if 111 trip needed before N1-EOP-1 attachment 4 jumpers can
- Verifies started Containment Spray pumps be installed due to scenario progression and 121 and 122 resource limitations. If Core Spray pumps are placed
- If 80-118 is open for Torus Cooling:
in PTL, at least one Core Spray pump should be
- Opens 80-35 restarted after jumper installation for App J water
- Closes80-118 seal. Core Spray may also be used as an alternate
- Verifies open 80-40 and 80-45 injection source.
- Prevents Core Spray injection installing EOP-1 attachment 4 jumpers (17, 18, 19, 24, 25, 26), if directed
- Initiates both ECs
- Opens 4 ERVs CT-2
- RPV Slowdown in progress
- Primary Containment pressure controlled per N1-EOP-1 attachment 17 Page 25 of 25 NRC Scenario 4 March 2015
_.,,., Exelon Generation Copy of __
Training Id: NRC 2015 Scenario 5 Revision: 0.0 ERV Inadvertently Opens, Powerboard 16A Fault, Loss of All RBCLC, Loss of High Pressure Feedwater, Coolant Leak Inside Primary Containment,
Title:
RPV Flooding Signature I Printed Name Developed By E~*Paul Isham 6/2/14 Validated By Pat O'Brien 8/20/14 Leigh Mason 8/20/14 Dave Ballard 8/20/14 Facility Reviewer Greg Elkins Page 1 of 25 NRC Scenario 5
=~Exelon Generation References
- 1. N1-0P-33A, 115 KV System
- 2. N 1-SOP-1.4, Stuck Open ERV
- 3. N 1-SOP-1.1, Emergency Power Reduction
- 4. N1-SOP-11.1, RBCLC Failure
- 5. N1-SOP-1, Reactor Scram
- 6. N1-EOP-2, RPV Control
- 7. N1-EOP-4, Primary Containment Control
- 9. N1-EOP-7, RPV Flooding
- 10. Unit 1 Technical Specifications Page 2 of 25 NRC Scenario 5
=:rExelon Generation Instructor Information A. Scenario Description Sequence of Events I Expected Crew Response:
The scenario begins at approximately 100% power. Containment Spray pump 112 and Reactor Building Exhaust Fan 12 are out of service for maintenance. The crew will remove Line 4 from service for maintenance.
The CRS will determine the Tech Spec impact.
Next, ERV 111 will inadvertently open. The crew will enter N1-SOP-1.4, Stuck Open ERV. The crew will perform an emergency power reduction to approximately 85% power, then take actions to close ERV 111 (Critical Task). These actions will close the ERV, but leave it inoperable. The CRS will determine the Tech Spec impact.
Next, Powerboard 16A will develop an electrical fault. This will cause a loss of power to three Drywell cooling fans. The crew will start an additional Drywell cooling fan to stabilize Drywell temperature and pressure. The electrical loss will also affect EDG 103 auxiliary equipment. The CRS will determine the Tech Spec impact.
Next, the running RBCLC pumps will trip. The standby RBCLC pump will trip upon being started. The crew will enter N1-SOP-11.1, RBCLC Failure. The crew will scram the Reactor, trip Recirculation pumps, initiate Emergency Condensers, and shut the MSIVs. The high pressure Feedwater pumps will fail to operate on the scram, complicating Reactor water level control.
Once the crew stabilizes the plant after the scram, a coolant leak will develop inside the Primary Containment.
The crew will re-enter N1-EOP-2, RPV Control, and N1-EOP-4, Primary Containment Control. Containment parameters will degrade and the crew will initiate Containment Sprays (Critical Task). The elevated Containment temperature will cause the Fuel Zone level indications to become erratic. With all other Reactor water level indicators downscale, the crew will execute N1-EOP-7, RPV Flooding, to lower Reactor pressure and flood the Reactor to the Main Steam lines (Critical Task).
- 1. Termination Criteria
- a. RPV Flooding in progress
- b. Reactor water level on scale or upscale
- c. Containment pressure and temperature controlled in accordance with N1-EOP-4 Page 3 of 25 NRC Scenario 5
Exelon Generation
- 2. Critical Tasks CT-1, Given an inadvertently open ERV at power, close the ERV or insert a manual scram prior to Torus temperature exceeding 110°F, in accordance with N1-SOP-1.4 Justification:
Safety Significance: A manual Reactor scram is required before Torus temperature exceeds 110° F. This reduces the rate of energy production and thus heat input to the Torus. Additionally, this allows evaluating the success of the Reactor scram before boron injection would be required due to Torus temperature in the event of a failure to scram. Closing the ERV prior to the need for the scram avoids the need for these more substantial actions, prevents challenging the plant with a scram, and stops heat input to the Torus.
Cueing: ERV position, ERV acoustic monitors, ERV tailpipe temperature, Torus temperature, Reactor pressure, and steam flow indicate an open ERV. N1-SOP-1.4 provides direction to close the ERV or scram the Reactor.
Measurable Performance Indicators: Pulling ERV fuses, directing an operator to pull ERV fuses in the field, rotating the Mode Switch to SHUTDOWN, and/or depressing the manual scram pushbuttons will provide observable actions for the evaluation team.
Performance Feedback: ERV position, ERV acoustic monitors, ERV tailpipe temperature, Torus temperature, Reactor pressure, and steam flow will provide performance feedback regarding success of crew actions to close the ERV. Control rod position and Reactor power will provide performance feedback regarding success of crew actions to scram the Reactor.
Page 4 of 25 NRC Scenario 5
=~Exelon Generation CT-2, Given a LOCA in the Drywell, initiate Containment Sprays prior to exceeding the Pressure Suppression Pressure limit, in accordance with N1-EOP-4 Justification:
Safetv Significance: Initiating Containment Sprays reduces Primary Containment pressure. This reduces stresses on the Drywell and Torus, assists in avoiding "chugging" that may cause fatigue failure of the LOCA downcomers, and avoids the need for a blowdown. These benefits reduce challenges to the fuel cladding, the RPV, and the Primary Containment.
Cueing: Multiple Primary Containment pressure and temperature indications and annunciators will indicate degrading conditions. N1-EOP-4 provides direction to initiate Containment Sprays.
Measurable Performance Indicators: Manipulation of Containment Spray pump control switches will provide observable actions for the evaluation team.
Performance Feedback: Containment Spray flow and lowering Primary Containment pressure and temperature indications will provide performance feedback regarding success of crew actions to initiate Containment Sprays.
CT-3, Given the plant with RPV water level unknown, execute N1-EOP-7, RPV Flooding, in accordance with N1-EOP-2.
Justification:
Safety Significance: With Reactor water level unknown, the status of core cooling is unknown. RPV flooding is required to establish conditions to cool the core. This protects the fuel cladding integrity.
Cueing: Multiple Reactor water level indications will indicate either downscale or invalid. N1-EOP-2 provides direction to implement N1-EOP-7, RPV Flooding.
Measurable Performance Indicators: Manipulation of ERVs, MS/Vs, EC/Vs, and injection system controls provide observable actions for the evaluation team.
Performance Feedback: ERV, MSIV, and EC/V position indications, Reactor pressure, ERV tailpipe temperatures, and ERV acoustic monitors provide performance feedback regarding success of RPV flooding actions.
- 3. Length
- a. -60 minutes Page S of 25 NRC Scenario 5
=:r-Exelon Generation
- 4. Mitigation Strategy Code
- 5. Technical Specifications
- a. TS 3.6.3 (b)
- b. TS 3.1.5 (b)
- 6. EAL Classification
- a. Site Area Emergency per FS1 .1 - Loss or potential loss of ANY two fission product barriers.
- 7. Special Orders
- a. None Page 6 of 25 NRC Scenario 5
=~Exelon Generation
- 8. Initial Conditions
- 1. IC Number
- a. IC-155
- 2. Presets I With Triggers
- a. Malfunctions
- 1) CT01B, CT Pump 112 Trip Inserted
- 2) HV01 B, Reactor Building Exhaust Fan Trip 12 Inserted
- 4) ED12A, PB 16A Electrical Fault TRG3
- 5) CW04A, RBCLC Pump 11 Trip TRG4
- 6) CW04B, RBCLC Pump 12 Trip TRG4
- 7) CW04C, RBCLC Pump 13 Trip TRG4
- 8) FW03A, FEEDWATER PUMP TRIP 11 TRG5
- 9) FW03B, FEEDWATER PUMP TRIP 12 TRG5
- 10) FW06, SHAFT DRIVEN FEEDWATER PUMP CLUTCH FAILS- TRG5 DISENGAGES
- 11) CU01, CU COOLANT LEAK INSIDE OF DRYWELL, FV=70, RT=5:00 TRG6
- 12) EC01, Steam Supply Line Break in PC, FV=5, RT=5:00 TRG6
- 13) VICP20168_FE CP-201-68, Fuel Zone Erratic Failure TRG7
- 14) VICP20169_FE CP-201-69, Fuel Zone Erratic Failure TRG7
- b. Remotes
- 1) AD01 A, ERV 111 Fuses, FV=pulled TRG27
- 2) AD07, Acoustic Monitor Alarm Reset, FV=reset TRG 28
_.,,,, Exelon Generation
- c. Overrides
- 1) OVR-5M76A03510 1F1/36-20 FV= -33.84 (LLL downscale indication) TRG7
- 2) OVR-5M75A03500 1 F1/36-19 FV= -33.84 (LLL downscale indication)
- d. Annunciators
- 1) None
TRG 7 -Activates on DW hzarrl19<0.075&&hzarrl20<0.075&&pctdw8 Blank temp >200°F, LLL level below >200&&ctfdw>100
-20", and Containment Spray flow to Drywell >100 gpm to insert Fuel Zone erratic indication.
- f. Equipment Out of Service
- 1) Containment Spray pump 112 in PTL with yellow tag
- 2) Containment Spray suction isolation valve 112 closed with yellow tag
- 3) Reactor Building Exhaust fan 12 OOS with yellow tag
- g. Support Documentation
- 1) N1-0P-33A Section H.12 marked up to Step H.12.9.
- h. Miscellaneous
- 1) Ensure Drywell cooling fan 11 is secured with control switch in neutral.
- 3) Update Divisional Status Board.
Page 8 of 25 NRC Scenario 5
~* Exelon Generation SHIFT TURNOVER INFORMATION ON COMING SHIFT: IN ID DATE: -=Tc..: :oo.. =d=a_,_y_ __
PARTI: To be performed by the oncoming Operator before assuming the shift.
PART II: To be reviewed by the oncoming Operator before assuming the shift.
- LCO Status (SRO)
- Shift Turnover Information Sheet Evolutions/General Information/Equipment Status:
- Reactor power is approximately 100%.
- Containment Spray pump 112 is out of service for maintenance (Day 1 of planned 2 day window; 15 day LCO per TS 3.3.7.b).
- Reactor Building Exhaust Fan 12 is out of service for maintenance.
PART Ill: Remarks/Planned Evolutions:
- Remove Line 4 from service per N1-0P-33A Section H.12 to support National Grid maintenance. The procedure has been completed up to Step H.12.9.
Page 9 of 25 NRC Scenario 5
~* Exelon Generation Shift Turnover Take the Simulator out of freeze before the crew enters for the pre-shift walkdown.
- Verify annunciator sound turned on
- If recording scenario, start the recording device during the pre-shift walkdown Allow no more than 5 minutes to walkdown the Crew panels.
- Walkdown panels
- Conduct shift turnover brief
- Assume the shift Page 10 of 25 NRC Scenario 5
=~Exelon Generation Event #1: Remove Line 4 From Service
- Initial reactor power is -100%
- The crew will remove line 4 from service SRO
- Directs removing Line 4 from service per N1-0P-33A Section H.12
- Provides oversight for evolution
- Determines Technical Specification 3.6.3.b requires returning Line 4 to service within 7 days.
- Reviews N1-0P-33A Section H.12
- Verifies Auto Reclosure for R-40 breaker is OFF
- Opens breaker R-40
- Dispatches Operator to confirm R-40 open locally Role Play: on ALL 3 phases When asked as Operator to confirm R40 position,
- Notifies SM to review TS for appropriate LCO immediately report all three phases of R-40 are open. applicability
- Continues at Section H.9.0, Loss of 115 KV Line 4
- Monitors plant parameters
- Provides peer checks as needed
- Line 4 removed from service Page 11 of 25 NRC Scenario 5
,..,.,,, Exelon Generation Event #2: ERV 111 Inadvertently Opens
- ERV 111 Inadvertently Opens
- Operators will respond per SOP-1.4 to attempt to shut the ERV and SOP1 .1 to lower power.
- Acknowledges/reports annunciators
- Diagnoses ERV 111 has inadvertently opened ADOS, ERV 111 Failure - Opens Inadvertently TRG 1 ERV 111 opens Reactor pressure lowers slightly Reactor power lowers and then rises slightly Torus temperature rises Torus level rises Expected annunciators:
F1-4-8, STEAM LINE DETECTION SYS FLOW OFF NORM F2-4-1, MAIN STM LINE ELECTROMA TIC RELIEF VALVE OPEN H3-4-5, PRESS SAFETY/RELIEF VALVES FLOW Page 12 of 25 NRC Scenario 5
=~Exelon Generation SRO Event 2 continued
- Acknowledges reports
- Directs entry into N 1-SOP-1.4, Stuck Open ERV
- Directs emergency power reduction to approximately 85% power
- Provides oversight for reactivity manipulation
- Determines that ERV 111 is inoperable per TS 3.1.5.b, requiring a 10 hour1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> shutdown
- Directs taking action to close ERV 111 or directs a manual scram prior to Torus temperature exceeding 110°F, in accordance with N1-SOP-1.4 CT-1
- Acknowledges that ERV 111 has closed
- Enters N1-EOP-4 if Torus temp rises above 85°F or Torus level rises above 11.25'
- Directs Containment Spray to PTL
- May direct initiation of Torus Cooling per N1-EOP-1 att 16 or N1-SOP-1.4 ATC
- Performs emergency power reduction per N 1-SOP-1.1
- Reduces Recirculation master controller to lower power to approximately 85%
- Monitors APRMs
- Monitors Recirculation flow
- Monitors position on power to flow map
- If Torus temperature approaches 110°F, inserts manual Reactor scram CT-1 Page 13 of 25 NRC Scenario 5
Exelon Generation Event 2 continued BOP
- Enters N1-SOP-1.4 Role Play: When directed as Operator to go to
- Determines ERV 111 is open using:
Auxiliary Control Room and verify ERV 111 is open, - Valve indicating lights on F panel wait one minute and report ERV 111 is open. - Red ERV flow indicating light on F panel Subsequent reports on acoustic monitor status may
- Sends an operator to the Aux Control Room to be given immediately, with close attention paid to the actual status of the ERV. verify ERV open using Acoustic Monitor
- Attempts to close ERV 111 by performing one or Note: Safety glasses, gloves, and long sleeves or a all of the following:
lab coat are required for pulling fuses in F panel. Depresses ADS Timer Reset pushbuttons Cycles Control Switch for ERV 111 Pulls control power fuses F15 and F30 in F panel (ERV 111)
Role Play: If the Operator is directed to pull fuses in o OR the RB wait 3 minutes and insert remote: Directs operator to pull ERV 111 fuses on AD01A, ERV 111 Fuses, FV=pulled RB 237' CT-1 TRG27
- Checks with operator in Aux Control Room to see Report fuses are pulled.
if ERV is still open
- Determines/verifies ERV closes
- Directs reset of acoustic monitor Role Play: When directed as operator to reset the
- Notifies crew that ERV 111 has closed acoustic monitor, wait 1 minute and insert remote:
- Monitors Torus temperature AD07, Acoustic Monitor Alarm Reset, FV=reset
- Reports if/when Torus temperature exceeds 85°F or Torus level exceeds 11.25' TRG28 Places Containment Spray pumps in PTL if Report acoustic monitor is reset. directed Page 14 of 25 NRC Scenario 5
Exelon Generation BOP continued
- Places Torus cooling in service when directed, per N1-SOP-1.4, att 2 or N1-EOP-1 att 16:
Close CONT SPRAY BYPASS BV(s) for selected loop Verifies closed 80-115 Verifies closed 80-114 Verifies closed Cont Spray Discharge IV for selected loop Verifies open CONT SPRAY BYPASS BV for selected loop Fully opens80-118 Starts Containment Spray Raw Water pump in selected loop Starts Containment Spray pump in selected loop Page 15 of 25 NRC Scenario 5
=:rExelon Generation Event #3: Powerboard 16A Electrical Fault
- The plant experiences an electrical fault on PB 16A
- The crew will take action to mitigate further degradation to the plant.
When directed by examiner, insert malfunction: CREW ED12A, PB 16A Electrical Fault
- Recognize/report loss of Powerboard 16A
- Recognize/report trip of three Drywell cooling TRG3 fans Three Drywell cooling fans de-energize Drywel/ pressure and temperature rise
- Recognize/report trip of RBCLC pump 11 Spent Fuel Pool Cooling pump 11 trips
- Recognize/report Spent Fuel Pool trouble alarm RBCLC pump 11 trips Expected Annunciators:
L4-3-6, DRYWELL COOLING FAN TRIP-VIB A4-3-1, POWER BO. 16 R1041 TRIP A4-4-2, POWER BO. 16 LOW BUS VOLTAGE L 1-4-5, FUEL POOL ANNUNCIATOR SRO
- Directs execution of ARPs
- Directs start of Drywell cooling fan 11
- May direct lowering RBCLC temperature
- May direct Reactor power reduction per N1-SOP-1.1
- If Drywell average temperature exceeds 150°F, enters N1-EOP-4
- Directs placing Containment Spray pumps in PTL
- Directs entry into N1-SOP-6.1, Loss of SFP/Rx Cavity Level/Decay Heat Removal
- May direct start of RBCLC pump 12 Page 16 of 25 NRC Scenario 5
Exelon Generation Event 3 continued ATC
- Monitors plant parameters
- If directed, lowers Reactor power per N1-SOP-1.1 BOP
- Executes ARPs
- Dispatches operator/maintenance to investigate Powerboard 16A Role Play:
- Dispatches operator to investigate Spent Fuel Pool alarm If requested to investigate Powerboard 16A, wait 2 minutes, then report the feeder breaker is tripped and
- Acknowledges/reports Powerboard 16A is faulted there is an acrid odor in the area. Electrical
- Starts Drywell cooling fan 11 Maintenance does NOT recommend re-energizing
- May green flags Drywell cooling fans 14, 15, and 16 Powerboard 16A.
- May start RBCLC pump 12
- May green flag RBCLC pump 11 Role Play:
- If directed, lowers RBCLC temperature per N1-If requested to investigate SFPC trouble, wait 2 OP-11:
minutes, then report SFPC pump 11 tripped. If 0 Places RBCLC TCV in manual:
directed to restore SFPC, acknowledge order, but 0 Depresses the AIM Button UNTIL red delay any action for rest of scenario.
LED is illuminated next to "M" 0 Verifies70-238.V is displayed in the LED readout 0 IF 70-238.V is NOT displayed, THEN depresses the "D" button UNTIL the display shows70-238.V 0 Adjusts RBCLC temperature as desired 0 May lower RBCLC TCV automatic setpoint per N1-0P-11 Section H.24.0 Page 17 of 25 NRC Scenario 5
=~Exelon Generation BOP continued o May place RBCLC TCV back in automatic:
Event 3 continued o Depresses the AIM Button UNTIL green LED is illuminated next to "A" o Verifies70-238. P is displayed in the LED readout o IF 70-238.P is NOT displayed, THEN depresses the "D" button UNTIL the display shows70-238. P o Verifies TCV-70-137 is responding properly to automatic control
- If directed, places Containment Spray pumps in PTL Page 18 of 25 NRC Scenario 5
Exelon Generation Events #4 and #5 : All RBCLC Pumps Trip, Feedwater Pumps Fail to Operate
- A trip of the running RBCLC pumps occurs with no standby pump available.
- The crew will execute the override actions of N 1-SOP-11.1.
When directed by lead examiner, insert CREW malfunction:
- Later:
CW048, RBCLC Pump 12 Trip o Recognize/report Feedwater pump 11 and 12 trips CW04C, RBCLC Pump 13 Trip o Recognize/report Feedwater pump 13 TRG4 disengages RBCLC pumps trip o Recognize/report low Reactor water level RBCLC pressure lowers RBCLC temperature Expected Annunciators:
H1-1-1, REACTOR BLDG COOL PUMP 11 TRIP-V-SUCT H1-2-1, REACTOR BLDG COOL PUMP 12 TRIP-V-SUCT H1-3-1, REACTOR BLDG COOL PUMP 13 TRIP-V-SUCT H1-4-1, R BUILDING COOLING WATER PRESS TEMP MAKEUP FLOW K2-4-3, DRYWELL PRESSURE HIGH-LOW K3-4-4, CLEAN-UP SYSTEM /SOLA TION Page 19 of 25 NRC Scenario 5
=:rExelon Generation Events 4 and 5 continued SRO
- Acknowledges reports Verify the following malfunctions are automatically
- Directs entry into N1-SOP-11.1 inserted when the Reactor scrams:
- Directs execution of override, including:
o Manual Reactor scram FW06, FW06, SHAFT DRIVEN FEEDWATER PUMP o Trip Recirculation pumps CLUTCH FAILS - DISENGAGES o Initiate Emergency Condensers TRG5 o Close MSIVs Feedwater pumps 11 and 12 trip immediately after starting, o Trip RWCU pump Feedwater pump 13 disengages Reactor water level remains lower than normal
- Acknowledges scram report Expected Annunciators:
- Enters N1-EOP-2, RPV Control, on low RPV H3-1-7, REACTOR FWPUMP 11 TRIP OVERLOAD SUCTION HI-LEVEL water level H3-2-7, REACTOR FW PUMP 12 TRIP OVERLOAD
- Answers "Are all control rods inserted to at least SUCTION HI-LEVEL H3-4-8, REACTOR FW SHAFT P13 CLUTCH TROUBLE position 04 ?" YES F2-3-3, REACT VESSEL LEVEL HIGH-LOW
- Directs entry into N 1-SOP-1, Reactor Scram
- Directs RPV water level controlled between -84" is narrower (ex. O" to 95"). and 95" using CRD and/or Liquid Poison
- Directs RPV cooldown <100°F/hr using Emergency Condensers
- Enters N1-EOP-4, Primary Containment Control, on high Drywell temperature o Directs lockout of Containment Spray pumps Page 20 of 25 NRC Scenario 5
Exelon Generation Events 4 and 5 continued ATC
- Places Reactor Mode Switch to SHUTDOWN
- Provides scram report
- Performs scram verification actions of N 1-SOP-1, Reactor Scram:
- Confirms all rods inserted
- Observes Reactor power lowering
- Places IRMs on range 9
- Down-ranges IRMs as necessary
- Verifies main turbine and generator tripped
- Executes N 1-SO P-11 . 1
- Attempts to start standby RBCLC pump Note: Depending on timing, Lo-Lo Reactor water
- Informs crew of need to execute override level may trip Recirculation pumps, initiate
- Enters N1-SOP-1 Emergency Condensers, and close MSIVs before
- Informs crew of Feedwater pump trips and low operator action. Reactor water level
- Trips Recirculation pumps Note: RWCU will likely trip on high temperature
- Initiates Emergency Condensers before operator action.
- Closes MSIVs
- Verifies RWCU pump tripped
- May maximize CRD flow by starting second CRD pump and/or taking FCV to manual and opening Note: Recommend initiating next event shortly after further the reactor is scrammed.
- May start Liquid Poison
- Places Containment Spray pumps in PTL Page 21 of 25 NRC Scenario 5
Exelon Generation Events #6 and #7: Coolant Leak Inside Primary Containment and Fuel Zone Level Instrument Erratic Indication
- A reactor coolant leak develops in the drywell
- When containment parameters degrade sufficiently, fuel zone level instrumention will begin to give erratic indication and drive the crew into RPV Flooding.
When directed by examiner, insert malfunctions: CREW CU01, CU Coolant Leak Inside of Drywell, RT=5:00,
- Recognize/report degrading Containment FV=70 parameters EC01, Steam Supply Line Break in PC, RT=5:00, FV=5 TRG6 Containment parameters degrade RPV water level lowers Expected annunciators:
H2-4-7, DRYWELL WATER LEAK DETECTION SYS K2-4-3, DRYWELL PRESSURE HIGH-LOW L 1-4-4, DRYWELL - TORUS TEMP HIGH F1-1-5, RPS CH 11 DRYWELL PRESS HIGH F4-1-4, RPS CH 12 DRYWELL PRESS HIGH F1-2-3, RPS CH 11 REACTOR LEVEL LOW-LOW F4-2-6, RPS CH 12 REACTOR LEVEL LOW-LOW F1-3-3, RPS CH 11 REACTOR LEVEL LOW-LOW-LOW F4-3-6, RPS CH 12 REACTOR LEVEL LOW-LOW-LOW Page 22 of 25 NRC Scenario 5
=~Exelon Generation Events 6 and 7 continued SRO
- Acknowledges reports from the crew
- Re-enters N1-EOP-4 on high Drywell pressure
- Re-enters N1-EOP-2 on high Drywell pressure
- Transitions to Alternate Level Control leg of N1-EOP-2
- Direct ADS bypassed
- Verifies EC initiation
- If either Drywell temperature approaches 300°F Note: Due to an already low RPV water level when or Torus pressure exceeds 13 psig:
Drywell pressure reaches 3.5 psig, Containment o Answers "Below the Containment Spray Spray may auto-start before the crew can prevent it.
Initiation Limit?" Yes In accordance with the EOPs, the crew will then o Verifies all Recirc pumps tripped verify proper operation per N1-EOP-1attachment17.
o Directs trip of all Drywell cooling fans In this case, Critical Task 2 shall be evaluated as o Direct Containment Sprays per N1-EOP-1 "Not Applicable".
attachment 17 CT-2 Verify the following malfunction is automatically
- Monitors location on Pressure Suppression inserted when DW temp is above 200°F, LLL level Pressure curve indicates below -20", and Containment Spray has
- Acknowledges sporadic readings of Fuel Zones been initiated:
- Acknowledges RPV water level is unknown
- Exits N1-EOP-2, enters N1-EOP-7, RPV Flooding VICP20168_FE CP-201-68, Fuel Zone Erratic Failure CT-3 VICP20169_FE CP-201-69, Fuel Zone Erratic Failure TRG7 Fuel Zone indications give sporadic numbers All other RPV water level instruments are either downscale or below minimum usable levels Page 23 of 25 NRC Scenario 5
Exelon Generation SRO continued Events 6 and 7 continued
- Answers "Are all control rods inserted to at least position 04?" Yes
- Answers "Torus water level?" Above 8.0 ft
- Directs open 4 ERVs
- Directs injection to flood the RPV to the main steam lines using low pressure Feedwater, CRD, Core Spray or Alternate Injection Systems
- Answers "Can any ERV be opened?" Yes
- Directs MSIVs and EC steam IVs verified closed
- Acknowledges RPV water level rising ATC/BOP
- Places Containment Spray pumps in PTL, or verifies proper operation per N1-EOP-1 attachment 17
- Bypasses ADS
- Verifies EC initiation
- Monitors Containment parameters
- Reports if either Drywell temperature approaches 300°F or Torus pressure exceeds 13 psig Page 24 of 25 NRC Scenario 5
=:--Exelon Generation ATC/BOP Continued Events 6 and 7 continued
- If Containment Spray did not auto-start earlier:
- Verifies all Recirc pumps tripped
- Trips all Drywell cooling fans
- Initiates Containment Sprays per N1 -EOP-1 attachment 17:
CT-2
- Verifies started, two Containment Spray pumps
- IF required to lower Containment pressure, start additional Containment Spray Pumps
- Reports Containment pressure and temperature lowering
- Recognizes/reports sporadic Fuel Zone values
- Recognizes/reports RPV water level is unknown
- Opens 4 ERVs
- Injects to flood the RPV to the main steam lines using low pressure Feedwater, CRD, Core Spray or Alternate Injection Systems CT-3
- Verifies MSIVs and EC steam IVs closed
- Monitors for indications of successful flooding
- Reports RPV water level rising
- RPV Flooding in progress
- Reactor water level on scale or upscale
- Containment pressure and temperature controlled in accordance with N1-EOP-4.
Page 25 of 25 NRC Scenario 5
=::"Exelon Generation BOP continued
- If any ERV is cycling:
- Initiates Emergency Condensers
- IF initiating EC Loop 11, places 39-05, EMERG CNDSR COND RET ISOLATION VALVE 11 control switch in OPEN
- IF initiating EC Loop 12, places 39-06, EMERG CNDSR COND RET ISOLATION VALVE 12 control switch in OPEN
- Subsequently controls EC valves per EOP-HC att 9
- Verifies all Recirc Pumps tripped
- Initiates Liquid Poison as directed
- Reports initial tank level
- Starts Liquid Poison pump 11 or 12
- Verifies RWCU isolated
- RPV water level controlled in assigned band
- Reactor power < 6%
- Control rod insertion in progress or complete Page 28 of 28 NRC Scenario 3 March 2015