ML15110A384

From kanterella
Jump to navigation Jump to search

NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
ML15110A384
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/18/2015
From: Isham P
Exelon Generation Co
To: Todd Fish
Operations Branch I
Shared Package
ML14238A301 List:
References
TAC U01905
Download: ML15110A384 (1)


Text

Memorandum To: --- Mr: Todd Fish .. _.

  • CC:

From: Paul Isham Date: 02/18/2015 Re: Proposed revisions for Nine Mile Point Unit 1 March 2015 operating exam The following revisions have been made to the Nine Mile Point Unit 1March2015 operating exam based on submittal comments and NRC prep week:

Scenario 2

  • Made adjustment to field reports coming into the control room.

Scenario 3

  • Made adjustment to field reports corning into the control room.

Simulator JPM 5

  • Downgraded from alternate path.

Simulator JPM 8

  • Downgraded from alternate path.

Simulator JPM 6

  • Replaced with a new alternate path JPM.
  • Added an examiner note regarding steps that can be performed concurrently.

Simulator JPM 7

  • Minor adjustment to simulator initial conditions.

Admin JPM RO/SRO C002

  • Added additional clarifying information to the KEY
  • Made editorial change to applicant handout.

Admin JPM SRO RC

  • Added an additional KEY for a form the applicant completes.

Admin JPM SRO EP

  • Added additional KEY s for forms the applicant completes.

Admin JPM RO EP

  • Added evaluator cue to terminate JPM after final critical step.