ML12088A427: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 88: | Line 88: | ||
TRAINEE FEEDBACK: | TRAINEE FEEDBACK: | ||
: 1. What items would you include in this position-specific qualification card that were not included? | : 1. What items would you include in this position-specific qualification card that were not included? | ||
: 2. What items are included in this qualification card that you feel are unnecessary? | : 2. What items are included in this qualification card that you feel are unnecessary? | ||
: 3. Overall, how useful is this qualification card in helping you prepare to assume the duties of your position? Rate on a scale of 1 to 10 (1 = no use, 10 = extremely useful). | : 3. Overall, how useful is this qualification card in helping you prepare to assume the duties of your position? Rate on a scale of 1 to 10 (1 = no use, 10 = extremely useful). | ||
Rating: ____________ Comments: ___________________________________________________ | Rating: ____________ Comments: ___________________________________________________ | ||
Trainee Date EVALUATORS FEEDBACK: | Trainee Date EVALUATORS FEEDBACK: | ||
: 1. What items would you include in this position-specific qualification card that were not included? | : 1. What items would you include in this position-specific qualification card that were not included? | ||
: 2. What items are included in this qualification card that you feel are unnecessary? | : 2. What items are included in this qualification card that you feel are unnecessary? | ||
: 3. Overall, how useful is this qualification card in helping the trainee prepare to assume the duties of his or her position? Rate on a scale of 1 to 10 (1 = no use, 10 = extremely useful). | : 3. Overall, how useful is this qualification card in helping the trainee prepare to assume the duties of his or her position? Rate on a scale of 1 to 10 (1 = no use, 10 = extremely useful). | ||
Rating: ____________ Comments: ___________________________________________________ | Rating: ____________ Comments: ___________________________________________________ | ||
Evaluator Date Page 6 of 6}} | Evaluator Date Page 6 of 6}} |
Latest revision as of 16:56, 6 February 2020
ML12088A427 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 03/28/2012 |
From: | Entergy Nuclear Operations |
To: | Atomic Safety and Licensing Board Panel |
SECY RAS | |
Shared Package | |
ML12088A422 | List: |
References | |
RAS 22102, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01 | |
Download: ML12088A427 (6) | |
Text
ENT000056 Submitted: March 28, 2012 ENTERGY NUCLEAR ENGINEERING FTK-ESPP-G00019 QUALIFICATION CARD REV 2 IMPLEMENTING THE FLOW ACCELERATED CORROSION (FAC) PROGRAM Trainee Name: _____________________________ Employee Number: ____________
Task/Topic Number: FTK-ESPP-G00019 Evaluation:
The trainee has completed an interview covering the listed objectives and familiarization topics, and has demonstrated satisfactory knowledge, abilities, and skills regarding this topic/task to perform the assigned duties.
Mentor/Task Qualified Evaluator Signature Title Date Qualification (by Manager):
The trainee has successfully satisfied the task requirements and is authorized to perform the associated duties independently.
Qualifiers Signature Title Date Qualification Review (Training Management):
Signature Title Date Training Records Updated:
Matrix Signature Date Send completed form to Training Records Comments or Notes:
(This section is provided to document any additional information or comments as deemed appropriate by the trainee or mentor.)
Page 1 of 6
ENTERGY NUCLEAR ENGINEERING FTK-ESPP-G00019 QUALIFICATION CARD REV 2 IMPLEMENTING THE FLOW ACCELERATED CORROSION (FAC) PROGRAM Trainee Instructions:
After completing the prerequisite coursework, review the learning objectives to become familiar with the knowledge to be obtained by completing this qualification card. Using the listed references, acquire the knowledge needed to satisfy the stated learning objectives through self-study, discussions with other incumbents or subject matter experts, or practical experience. Arrange an interview with the mentor to evaluate the learning achieved and discuss the listed familiarization topics. Bring this card to the mentor interview. Perform a practical or exercise, or provide a detailed discussion of task performance, as directed in the learning objectives.
Mentor Instructions:
Conduct the mentoring/evaluation in accordance with Nuclear Management Manual EN-TQ-104 procedure, Attachment 9.5. Review the learning objectives and discuss with the trainee. Evaluation of the trainees mastery of the learning objectives is expected.
However, qualitative evaluations may be used. For example, trainee mastery could be assessed using the following techniques:
- Asking hypothetical or situation questions and having the trainee provide an answer.
- Asking the trainee to state, describe, paraphrase, or discuss the requirement.
- Asking the trainee what referenced documents (above) provide guidance about the requirement.
- Asking the trainee to explain how applicable forms are completed.
Some learning objectives may require use of the applicable referenced documents because of the infrequent need to use the knowledge, the extent and complexity of presentation, or the level of detail and amount of material to be covered. Except when noted by an asterisk (*) behind the objective number, the trainee may use the listed standards or reference materials during the interview. When using listed standards or reference materials, the trainee should be able to quickly choose the applicable document and reference the required information.
Page 2 of 6
ENTERGY NUCLEAR ENGINEERING FTK-ESPP-G00019 QUALIFICATION CARD REV 2 IMPLEMENTING THE FLOW ACCELERATED CORROSION (FAC) PROGRAM Prerequisites:
None Standard:
The trainee, while referencing a copy of the reference(s) listed below, should demonstrate the ability to perform, simulate, or discuss the applicable knowledge and/or performance requirement.
References:
EN-DC-126, CALCULATIONS ENN-CS-S-008, Pipe Wall Thinning Structural Evaluation EN-DC-315, Flow Accelerated Corrosion Program.
EN-DC-174, Engineering Programs Section EN-MS-S-015-Multi, Conduct of Programs and Component Engineering EN-EP-S-005, Flow Accelerated Corrosion Scanning and Gridding Standard.
EN-OE-100, Operating Experience.
PS-S-001 Localized Pipe Wall Thinning and Crack-Like Flaw Evaluation Standard NRC Bulletin 87-01 Thinning of Pipe in Nuclear Power Plants.
NRC Generic Letter 89-08, Erosion/Corrosion Induced Pipe Wall Thinning.
NSAC 202L, EPRI Report, Recommendations for an Effective Flow Accelerated Corrosion Program.
EPRI TR-106611- Latest rev., Flow Accelerated Corrosion in Power plants.
References:
ANO-M-2555 ANO-M-555 Standard Work Practices:
All tasks are performed following the site standard work practices of Communications, Procedure Adherence, Self-Checking Principles, Security Practices, and use of Operating Experience.
Page 3 of 6
ENTERGY NUCLEAR ENGINEERING FTK-ESPP-G00019 QUALIFICATION CARD REV 2 IMPLEMENTING THE FLOW ACCELERATED CORROSION (FAC) PROGRAM Tools and Equipment:
In accordance with references Knowledge Requirements:
- 1. Review applicable references, including how to access them and where to go for more information. ______________/_____
Mentor/Evaluator Date
- 2. Discuss the relevant portions of ANSI-B31.1, Power Piping Code. ______________/_____
Mentor/Evaluator Date
- 3. Discuss the FAC program requirements, the NRC FAC requirements and the Site FAC program implementation. ______________/_____
Mentor/Evaluator Date
- 4. Discuss the inspection methods relating to FAC and how to evaluate and disposition the inspection data for each method. ______________/_____
Mentor/Evaluator Date
- 5. Discuss the sources of FAC related OE, screening for applicability and importance of industry Events to FAC implementation. ______________/_____
Mentor/Evaluator Date Page 4 of 6
ENTERGY NUCLEAR ENGINEERING FTK-ESPP-G00019 QUALIFICATION CARD REV 2 IMPLEMENTING THE FLOW ACCELERATED CORROSION (FAC) PROGRAM Performance Requirements:
NOTE: Circle the performance level used during mentoring if not specified. (P) Perform, (S) Simulate, or (D) Discuss.
- 1. Evaluate inspection results and perform a wall thinning Evaluation in accordance with applicable procedures. P, S ________________/_____
Mentor/Evaluator Date
- 2. Develop an inspection plan from CHECWORKS/SFA plants and industry operating experience and events, and wall thinning calculations P, S ________________/_____
Mentor/Evaluator Date
- 3. Prepare a CHECWORKS model P, S ________________/_____
Mentor/Evaluator Date
- 4. Demonstrate the knowledge necessary to P, S review a proposed plant modification or test for impact on the FAC Program. ________________/_____
Mentor/Evaluator Date Page 5 of 6
ENTERGY NUCLEAR ENGINEERING FTK-ESPP-G00019 QUALIFICATION CARD REV 2 IMPLEMENTING THE FLOW ACCELERATED CORROSION (FAC) PROGRAM TRAINEES NAME: _____________________
TRAINEE FEEDBACK:
- 1. What items would you include in this position-specific qualification card that were not included?
- 2. What items are included in this qualification card that you feel are unnecessary?
- 3. Overall, how useful is this qualification card in helping you prepare to assume the duties of your position? Rate on a scale of 1 to 10 (1 = no use, 10 = extremely useful).
Rating: ____________ Comments: ___________________________________________________
Trainee Date EVALUATORS FEEDBACK:
- 1. What items would you include in this position-specific qualification card that were not included?
- 2. What items are included in this qualification card that you feel are unnecessary?
- 3. Overall, how useful is this qualification card in helping the trainee prepare to assume the duties of his or her position? Rate on a scale of 1 to 10 (1 = no use, 10 = extremely useful).
Rating: ____________ Comments: ___________________________________________________
Evaluator Date Page 6 of 6