| title = 2.206 Petition Closure Letter
| title = 2.206 Petition Closure Letter
| author name = Howe A G
| author name = Howe A
| author affiliation = NRC/NRR/DIRS
| author affiliation = NRC/NRR/DIRS
| addressee name = Webster R
| addressee name = Webster R
Line 9: Line 9:
| docket = 05000219
| docket = 05000219
| license number =  
| license number =  
| contact person = Lamb J G
| contact person = Lamb J
| case reference number = 2.206, G20120902
| case reference number = 2.206, G20120902
| document type = 2.206 Petition, Letter
| document type = 2.206 Petition, Letter
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON.
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20555*0001 June 26, 2013 Mr. Richard Webster, Counsel GRAMMES and NJEF Power-Cotchett Attorney Environmental Enforcement Project, Public Justice Public Justice Center 500 E. Lexington Street Baltimore, MD 21202
D.C. 20555*0001 June 26, 2013 Mr. Richard Webster, Counsel GRAMMES and NJEF Power-Cotchett Attorney Environmental Enforcement Project, Public Justice Public Justice Center 500 E. Lexington Street Baltimore, MD 21202  


==Dear Mr. Webster:==
==Dear Mr. Webster:==
I am responding to your petition dated November 19,2012, and supplemented on November 30,2012, January 3,2013, and April 18, 2013.1 Your petition, which was addressed to Dr. Allison M. Macfarlane, was referred to the Office of Nuclear Reactor Regulation (NRR) pursuant to Section 2.206 of Title 10 of the Code of Federal Regulations (10 CFR 2.206) of the U.S. Nuclear Regulatory Commission's (NRC's) regulations.
I am responding to your petition dated November 19,2012, and supplemented on November 30,2012, January 3,2013, and April 18, 2013.1 Your petition, which was addressed to Dr. Allison M. Macfarlane, was referred to the Office of Nuclear Reactor Regulation (NRR) pursuant to Section 2.206 of Title 10 of the Code of Federal Regulations (10 CFR 2.206) of the U.S. Nuclear Regulatory Commission's (NRC's) regulations.
Management Directive (MD) 8.11, which is publicly available,2 describes the NRC's review process for 10 CFR 2.206 petitions.
Management Directive (MD) 8.11, which is publicly available,2 describes the NRC's review process for 10 CFR 2.206 petitions.
The New Jersey Environmental Federation, the Grandmothers, Mothers, and More for Energy Safety, and Beyond Nuclear, Inc. (collectively Petitioners) submitted an emergency 2.206 petition regarding lack of adequate protection of safety at Oyster Creek Nuclear Generating Station (Oyster Creek). Oyster Creek is owned by Exelon Generation Company, LLC (Exelon or the licensee).
The New Jersey Environmental Federation, the Grandmothers, Mothers, and More for Energy Safety, and Beyond Nuclear, Inc. (collectively Petitioners) submitted an emergency 2.206 petition regarding lack of adequate protection of safety at Oyster Creek Nuclear Generating Station (Oyster Creek). Oyster Creek is owned by Exelon Generation Company, LLC (Exelon or the licensee). Your petition was filed under 10 CFR 2.206 because you requested that the NRC keep Oyster Creek from restarting until the following conditions were met:
Your petition was filed under 10 CFR 2.206 because you requested that the NRC keep Oyster Creek from restarting until the following conditions were met: The evacuation plan is updated to reflect the new reality including evacuation shelters, blocked roads, emergency responders farther away and more distracted.
(1)    The evacuation plan is updated to reflect the new reality post-Sandy including evacuation shelters, blocked roads, emergency responders farther away and more distracted. etc.; and the sirens are repaired; (2)    The design storm for flood defense purposes is updated to reflect the recent spate of storms and climate change and, additional flood protection is put in place as appropriate; (3)    The "indications" (cracks or their precursors) are investigated ... and the public is assured through release of additional data ... and analysis ...
etc.; and the sirens are repaired; The design storm for flood defense purposes is updated to reflect the recent spate of storms and climate change and, additional flood protection is put in place as appropriate; The "indications" (cracks or their precursors) are investigated  
they pose no additional risk of a nuclear catastrophe; 1 Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML12326A361.
... and the public is assured through release of additional data ... and analysis ... they pose no additional risk of a nuclear catastrophe; 1 Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML ML 12338A246, ML 13015A144, and ML 13127A253, 2 ADAMS Accession No.
ML12338A246, ML13015A144, and ML13127A253, respectively.
R. -2 Exelon reviews whether the indications were predicted by its modeling and whether it can predict that no problematic indications will develop before the next inspection cycle and proof of ability to predict fatigue ... accurately is released to the public; and To ensure transparency, a public meeting with NRC is held at which staff can satisfactorily answer the public's concerns, including those above. On November 23, 2012, the NRR petition manager, Mr. John Lamb, offered you an opportunity to address the NRC's Petition Review Board (PRB) during a public meeting, which you accepted.
2 ADAMS Accession No. ML041770328.
Because the petition requested immediate action, the PRB met on November 26, 2012, to review the request. The PRB concluded that there was no immediate safety concern to Oyster Creek, or to the health and safety of the public as described further in the enclosure letter. The PRB's decision to deny your request for immediate action was communicated to you on November 26, 2012.3 You addressed the PRB on January 3,2013, to discuss your petition.
 
On April 3, 2013, the PRB met to make its initial recommendation on whether to accept or reject the petition for review using the criteria in IVID 8.11. In accordance with MD 8.11, Part III, C.2, "Criteria for Rejecting Petitions Under 10 CFR 2.206," the PRB made an initial recommendation that the issues raised in your petition, as supplemented, met the criteria for rejection because the issues raised have already been reviewed, evaluated, and resolved by the NRC, as described further in the enclosure to this letter. The PRB's initial recommendation was communicated to you on April 5,2013.4 A second opportunity to further address the PRB was provided and accepted.
R. Webster                                  -2 (4)    Exelon reviews whether the indications were predicted by its modeling and whether it can predict that no problematic indications will develop before the next inspection cycle and proof of ability to predict fatigue ...
This meeting took place on April 18, 2013.5 On June 17, 2013, the PRB met to discuss the supplemental information you provided.
accurately is released to the public; and (5)    To ensure transparency, a public meeting with NRC is held at which staff can satisfactorily answer the public's concerns, including those above.
The PRB's final recommendation is that your petition does not meet the criteria for consideration under 10 CFR 2.206, because it raises issues for Oyster Creek that have already been reviewed, evaluated, and resolved by the NRC; therefore, the PRB has concluded that your petition meets the criteria for rejection in accordance with MD 8.11, Part III, C.2. You provided comments regarding the 2.206 petition process and those comments have been provided to the 2.206 Coordinator in the Division of Policy and Rulemaking.
On November 23, 2012, the NRR petition manager, Mr. John Lamb, offered you an opportunity to address the NRC's Petition Review Board (PRB) during a public meeting, which you accepted.
3 ADAMS Accession No. ML 12331A345.
Because the petition requested immediate action, the PRB met on November 26, 2012, to review the request. The PRB concluded that there was no immediate safety concern to Oyster Creek, or to the health and safety of the public as described further in the enclosure letter. The PRB's decision to deny your request for immediate action was communicated to you on November 26, 2012. 3 You addressed the PRB on January 3,2013, to discuss your petition. On April 3, 2013, the PRB met to make its initial recommendation on whether to accept or reject the petition for review using the criteria in IVID 8.11. In accordance with MD 8.11, Part III, C.2, "Criteria for Rejecting Petitions Under 10 CFR 2.206," the PRB made an initial recommendation that the issues raised in your petition, as supplemented, met the criteria for rejection because the issues raised have already been reviewed, evaluated, and resolved by the NRC, as described further in the enclosure to this letter. The PRB's initial recommendation was communicated to you on April 5,2013. 4 A second opportunity to further address the PRB was provided and accepted.
4 ADAMS Accession No. ML 13098A200.
This meeting took place on April 18, 2013. 5 On June 17, 2013, the PRB met to discuss the supplemental information you provided. The PRB's final recommendation is that your petition does not meet the criteria for consideration under 10 CFR 2.206, because it raises issues for Oyster Creek that have already been reviewed, evaluated, and resolved by the NRC; therefore, the PRB has concluded that your petition meets the criteria for rejection in accordance with MD 8.11, Part III, C.2.
5 ADAMS Accession No. ML 13127A253.
You provided comments regarding the 2.206 petition process and those comments have been provided to the 2.206 Coordinator in the Division of Policy and Rulemaking.
R. -3 Enclosed are the detailed PRB's responses to the issues raised in your petition, as supplemented.
3 ADAMS Accession No. ML12331A345.
Thank you for bringing these issues to the attention of the NRC. Sincerely, , Allen Howe, Deputy Dir?c?; Division of Inspection and Regional Support Office of Nuclear Reactor Regulation Docket No: 50-219  
4 ADAMS Accession No. ML13098A200.
5 ADAMS Accession No. ML13127A253.
 
R. Webster                              -3 Enclosed are the detailed PRB's responses to the issues raised in your petition, as supplemented. Thank you for bringing these issues to the attention of the NRC.
Sincerely,
                                                ~4v-<-
Allen Howe, Deputy Dir?c?;
Division of Inspection and Regional Support Office of Nuclear Reactor Regulation Docket No: 50-219


==Enclosure:==
==Enclosure:==


As stated Licensee (w/copy of incoming 2.206 request) Listserv 2.206 PETITION BY NEW JERSEY ENVIRONMENTAL FEDERATION (ET. AL.) FOR OYSTER CREEK NUCLEAR GENERATING STATION EXELON GENERATION COMPANY, LLC DOCKET NO. 50-219 INTRODUCTION In the petition submitted November 19, 2012,1 Richard Webster, representing the New Jersey Environmental Federation, the Grandmothers, Mothers, and More for Energy Safety, and Beyond Nuclear, Inc. (collectively Petitioners) asked the U.S. Nuclear Regulatory Commission (NRC) to keep Oyster Creek Nuclear Generating Station (Oyster Creek) from restarting until the following conditions are met: The evacuation plan is updated to reflect the new reality post-Sandy including evacuation shelters, blocked roads, emergency responders farther away and more distracted, etc.; and the sirens are repaired; The desjgn storm for flood defense purposes is updated to reflect the recent spate of storms and climate change and, additional flood protection is put in place as appropriate; The "indications" (cracks or their precursors) are investigated  
As stated cc: Licensee (w/copy of incoming 2.206 request)
... and the public is assured through release of additional data ... and analysis ... they pose no additional risk of a nuclear catastrophe; Exelon reviews whether the indications were predicted by its modeling and whether it can predict that no problematic indications will develop before the next inspection cycle and proof of ability to predict fatigue. , . accurately is released to the public; and To ensure transparency, a public meeting with NRC is held at which staff can satisfactorily answer the public's concerns, including those above. On November 30, 2012,2 the Petitioners provided a supplement to the petition and requested that the public Petition Review Board (PRB) meeting be held close to Oyster Creek, The following is a summary of the issues the Petitioners are concerned about: The root cause of the control rod drive return nozzle safe end to pipe weld indications and the implications on the license renewal aging management program (AMP), That Sandy illustrates that beyond design-basis storms are now more probable than NRC has been assuming since 1969, when the plant was first licensed, 1 Agencywide Documents Access and Management System (ADAMS) Accession No. M L 12326A361.
Listserv
2 ADAMS Accession No. ML 12338A246.
 
Enclosure
2.206 PETITION BY NEW JERSEY ENVIRONMENTAL FEDERATION (ET. AL.)
-2 Emergency Preparedness and the situation on the ground, and The root cause of the leak on the reactor spray system and the implications on the license renewal AMP. The NRC communicated to the Petitioners on November 30,2012, and December 6,2012, regarding arrangements for a public meeting. The NRC informed the Petitioners that the public meeting would be held at the NRC Headquarters in Rockville, Maryland.
FOR OYSTER CREEK NUCLEAR GENERATING STATION EXELON GENERATION COMPANY, LLC DOCKET NO. 50-219 INTRODUCTION In the petition submitted November 19, 2012,1 Richard Webster, representing the New Jersey Environmental Federation, the Grandmothers, Mothers, and More for Energy Safety, and Beyond Nuclear, Inc. (collectively Petitioners) asked the U.S. Nuclear Regulatory Commission (NRC) to keep Oyster Creek Nuclear Generating Station (Oyster Creek) from restarting until the following conditions are met:
The NRC also informed the Petitioners that the purpose of the public meeting was to give them an opportunity to provide any additional explanation or support for the petition before the PRB's initial consideration and recommendation.
(1)      The evacuation plan is updated to reflect the new reality post-Sandy including evacuation shelters, blocked roads, emergency responders farther away and more distracted, etc.; and the sirens are repaired; (2)      The desjgn storm for flood defense purposes is updated to reflect the recent spate of storms and climate change and, additional flood protection is put in place as appropriate; (3)      The "indications" (cracks or their precursors) are investigated ... and the public is assured through release of additional data ... and analysis ...
The NRC also indicated that the meeting was not a hearing, nor was it an opportunity for the Petitioners to question or examine the PRB on the merits or the issues presented in the petition request. No decisions regarding the merits of the petition were made at the meeting. On January 3,2013,3 the Petitioners addressed the PRB in a public meeting held in the Commissioners' Hearing Room in Rockville, Maryland.
they pose no additional risk of a nuclear catastrophe; (4)      Exelon reviews whether the indications were predicted by its modeling and whether it can predict that no problematic indications will develop before the next inspection cycle and proof of ability to predict fatigue. , .
The public PRB meeting was scheduled from 11 :00 AM -1 :00 PM (Eastern Time). The public PRB meeting was recorded by the NRC Operations Center and was transcribed by a court reporter.
accurately is released to the public; and (5)      To ensure transparency, a public meeting with NRC is held at which staff can satisfactorily answer the public's concerns, including those above.
The transcript became a supplement to the petition.
On November 30, 2012,2 the Petitioners provided a supplement to the petition and requested that the public Petition Review Board (PRB) meeting be held close to Oyster Creek, The following is a summary of the issues the Petitioners are concerned about:
The transcript was also made publicly available.
* The root cause of the control rod drive return nozzle safe end to pipe weld indications and the implications on the license renewal aging management program (AMP),
There were telephone lines for members of the public to listen to the public PRB meeting. In addition, the public PRB meeting was webcasted through the NRC webpage. As the basis for this request, the Petitioners stated that they have serious concerns about the ongoing safety at Oyster Creek. The Petitioners believe that the NRC appears to be failing to enforce its regulations, and that lack of enforcement is leading to a lack of adequate protection at the power plant. The Petitioners have three points and one procedural issue. The Petitioners' points are: Exelon [Exelon Generation Company, LLC or licensee]
* That Sandy illustrates that beyond design-basis storms are now more probable than NRC has been assuming since 1969, when the plant was first licensed, 1 Agencywide Documents Access and Management System (ADAMS) Accession No. M L 12326A361.
discovered unacceptable indications near the control rod drive return level on the reactor pressure vessel, and the Petitioners have some concerns about how this was dealt with; During Hurricane Sandy, the Petitioners understand that the plant came within 6 inches of losing the service water pumps; and The Petitioners believe Exelon failed to report a major loss of offsite emergency response capability in violation of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.72(b)(3)(viii).
2 ADAMS Accession No. ML12338A246.
Enclosure
 
                                                  -2
* Emergency Preparedness and the situation on the ground, and
* The root cause of the leak on the reactor spray system and the implications on the license renewal AMP.
The NRC communicated to the Petitioners on November 30,2012, and December 6,2012, regarding arrangements for a public meeting. The NRC informed the Petitioners that the public meeting would be held at the NRC Headquarters in Rockville, Maryland. The NRC also informed the Petitioners that the purpose of the public meeting was to give them an opportunity to provide any additional explanation or support for the petition before the PRB's initial consideration and recommendation. The NRC also indicated that the meeting was not a hearing, nor was it an opportunity for the Petitioners to question or examine the PRB on the merits or the issues presented in the petition request. No decisions regarding the merits of the petition were made at the meeting.
On January 3,2013,3 the Petitioners addressed the PRB in a public meeting held in the Commissioners' Hearing Room in Rockville, Maryland. The public PRB meeting was scheduled from 11 :00 AM - 1:00 PM (Eastern Time). The public PRB meeting was recorded by the NRC Operations Center and was transcribed by a court reporter. The transcript became a supplement to the petition. The transcript was also made publicly available. There were telephone lines for members of the public to listen to the public PRB meeting. In addition, the public PRB meeting was webcasted through the NRC webpage. As the basis for this request, the Petitioners stated that they have serious concerns about the ongoing safety at Oyster Creek. The Petitioners believe that the NRC appears to be failing to enforce its regulations, and that lack of enforcement is leading to a lack of adequate protection at the power plant.
The Petitioners have three points and one procedural issue. The Petitioners' points are:
(1)    Exelon [Exelon Generation Company, LLC or licensee] discovered unacceptable indications near the control rod drive return level on the reactor pressure vessel, and the Petitioners have some concerns about how this was dealt with; (2)    During Hurricane Sandy, the Petitioners understand that the plant came within 6 inches of losing the service water pumps; and (3)    The Petitioners believe Exelon failed to report a major loss of offsite emergency response capability in violation of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.72(b)(3)(viii).
The Petitioners' procedural issue is that they believe there is a major problem with transparency, and despite the Petitioners' repeated requests, the NRC has provided the Petitioners with no documents beyond a few emails, which provided cursory information.
The Petitioners' procedural issue is that they believe there is a major problem with transparency, and despite the Petitioners' repeated requests, the NRC has provided the Petitioners with no documents beyond a few emails, which provided cursory information.
3 ADAMS Accession No. ML 13015A144.
3 ADAMS Accession No. ML13015A144.
-3 The Petitioners expressed the following concerns: Water levels reached to 7.4 feet at the plant's water intake structure on morning of October 30, 2012, and portends risks in future Because of power outages during the storm, 36 out of 43 warning sirens were inoperable so that an alert system in the surrounding community might have failed if it had been needed. Oyster Creek should have back-up power for sirens. Also because of the power outages, the Petitioners have concerns about capacity of the generators at the plant. What is their capacity to operate power outages are long-lasting and if the cooling pumps were close to and, if they did fail, are there other sources of cooling water for the Local residents have voiced concerns about electrical corrosion that might been caused by the storm. Can the NRC verify if seawater reached any electrical infrastructure at the plant and whether there was Local residents have also raised concerns about the dry cask storage area. Was the dry cask storage of radioactive waste area compromised and could it be vulnerable to a future storm? In light of dramatic changes to flood risks as evidenced by the Federal Emergency Management Agency (FEMA) new flood maps and damage from Sandy, the Petitioners asked that a revised flood management plan would be considered and an overall assessment made on how close we came to a disaster and whether projections indicate the site would be able to withstand damage from future hurricanes. The Petitioners asked that the NRC request the release of Exelon data on the analysis of the cracks, precursors to cracks and pinhole leaks that were observed in the reactor nozzle and cooling system. On April 18, 2013,4 the Petitioners addressed the PRB on a conference call. The conference call was recorded by the NRC Operations Center and was transcribed by a court reporter.
 
The transcript became a supplement to the petition.
                                                  -3 The Petitioners expressed the following concerns:
The transcript was also made available to the public. The Petitioners expressed that: (1) there was not a degree of separation between the PRB and the NRC staff; (2) Oyster Creek is not meeting GDC-2 [General Design Criterion 2, "Design Bases for Protection Against Natural Phenomena"]
* Water levels reached to 7.4 feet at the plant's water intake structure on the morning of October 30, 2012, and portends risks in future storms.
due to Hurricane Sandy; and (3) Oyster Creek did not meet reporting requirements during Hurricane Sandy. BACKGROUND On November 23,2012, the petition manager contacted the Petitioners to discuss the 10 CFR 2.206 process and to offer the Petitioners an opportunity to address the PRB by phone 4 ADAMS Accession No. ML 13127A253.
* Because of power outages during the storm, 36 out of 43 warning sirens were inoperable so that an alert system in the surrounding community might have failed if it had been needed. Oyster Creek should have back-up power for sirens.
-4 or in person. The Petitioners requested to address the PRB prior to its internal meeting to make the initial recommendation to accept or reject the petition for review. Because the petition requested immediate action, the PRB met internally on November 26, 2012, to review the request. The PRB denied the Petitioners request for immediate action on the basis that there was no immediate safety concern to Oyster Creek or to the health and safety of the public for the following reasons: On November 13, 2012,5 the FEMA concluded that offsite radiological emergency preparedness is adequate to provide "Reasonable Assurance," and that appropriate measures can be taken to protect the health and safety of the public, in the event of a radiological emergency at Oyster Creek in Ocean County, New Jersey. (2) At the time, there were 3 emergency notification sirens inoperable out of a total of 42 emergency notification sirens, which does not exceed Exelon's reporting threshold of 25 percent or more sirens out of service. At the time, Exelon was working to restore the 3 inoperable sirens. FEMA's assessment determined that, in the areas where the sirens were determined to be inoperable, the FEMA-approved backup notification method of route alerting could be conducted, if needed. (3) Hurricane Sandy did not exceed Oyster Creek's maximum flood level due to probable maximum hurricane (PMH). As reported in the Oyster Creek Final Safety Analysis Report (FSAR), Subsection 2.4.5, the maximum flood level due to PMH will be at elevation 22 feet (ft) mean sea level (MSL). The plant grade, elevation 23 ft MSL, is one foot above the PMH flood level. Therefore, the flood will not find its way into the plant buildings.
* Also because of the power outages, the Petitioners have concerns about the capacity of the generators at the plant. What is their capacity to operate when power outages are long-lasting and if the cooling pumps were close to failure; and, if they did fail, are there other sources of cooling water for the generators?
The floor levels are generally 6 inches above grade at elevation 23 ft and 6 inches. The circulating water intake structure, with its deck at elevation 6 ft, will be under water. This deck supports, apart from the other equipment, the circulating water pumps and the emergency service water pumps. During a PMH flood, the circulating water and service water pumps will become inoperable.
* Local residents have voiced concerns about electrical corrosion that might have been caused by the storm. Can the NRC verify if seawater reached any critical electrical infrastructure at the plant and whether there was corrosion?
As such, emergency plant procedures have been instituted that require the plant to be shutdown when flood waters reach a pre-determined level, ensuring the capability for safe shutdown under normal or abnormal conditions.
* Local residents have also raised concerns about the dry cask storage area. Was the dry cask storage of radioactive waste area compromised and could it be vulnerable to a future storm?
(4) During a planned, routine inspection program, Exelon discovered control rod drive return nozzle safe end to pipe weld indications.
* In light of dramatic changes to flood risks as evidenced by the Federal Emergency Management Agency (FEMA) new flood maps and damage from Sandy, the Petitioners asked that a revised flood management plan would be considered and an overall assessment made on how close we came to a disaster and whether projections indicate the site would be able to withstand damage from future hurricanes.
These indications were determined to be surface in nature and did not result in any leakage. Exelon completed a structural weld overlay in accordance with the American Society of Mechanical Engineers (ASME) Code. The Petitioners were informed on November 26, 2012,6 via email of the PRB's decision to deny the Petitioners' request for immediate action to keep Oyster Creek to restarting after its refueling outage. On November 28, 2012,7 the Petitioners requested to have a public meeting to address the PRB. 5 ADAMS Accession No. ML 12319A627.
* The Petitioners asked that the NRC request the release of Exelon data on the analysis of the cracks, precursors to cracks and pinhole leaks that were observed in the reactor nozzle and cooling system.
6 ADAMS Accession No. ML 12331A345.
On April 18, 2013,4 the Petitioners addressed the PRB on a conference call. The conference call was recorded by the NRC Operations Center and was transcribed by a court reporter. The transcript became a supplement to the petition. The transcript was also made available to the public. The Petitioners expressed that: (1) there was not a degree of separation between the PRB and the NRC staff; (2) Oyster Creek is not meeting GDC-2 [General Design Criterion 2, "Design Bases for Protection Against Natural Phenomena"] due to Hurricane Sandy; and (3)
-5 On November 30, 2012,8 the Petitioners requested information related to the reactor spray flange leak. The NRC communicated with the Petitioners on November 30,2012,9 and December 6,2012,10 regarding arrangements for the public PRB meeting. The NRC informed the Petitioners that the public meeting would be held at the NRC Headquarters in Rockville, Maryland.
Oyster Creek did not meet reporting requirements during Hurricane Sandy.
The NRC also informed the Petitioners that the purpose of the public PRB meeting was to give the Petitioners an opportunity to provide any additional explanation or support for the petition before the PRB's initial consideration and recommendation.
BACKGROUND On November 23,2012, the petition manager contacted the Petitioners to discuss the 10 CFR 2.206 process and to offer the Petitioners an opportunity to address the PRB by phone 4 ADAMS Accession No. ML13127A253.
The public PRB meeting was not a hearing, nor was it an opportunity for the Petitioners to question or examine the PRB on the merits or the issues presented in the petition request. The NRC informed the Petitioners that no decisions regarding the merits of the petition will be made at the public PRB meeting. On December 12, 2012,11 the NRC issued a public meeting notice for this meeting and placed it on the NRC public webpage. On December 31, 2012,12 the Petitioners made a request for the NRC to provide all the documents that the NRC staff reviewed in its decision-making.
 
On January 2,2013,13 the NRC informed the Petitioners that the public meeting would be held at the NRC Headquarters in Rockville, Maryland.
                                                  -4 or in person. The Petitioners requested to address the PRB prior to its internal meeting to make the initial recommendation to accept or reject the petition for review.
The NRC also outlined information on the purpose and format of the public PRB meeting as had been done in the November 30, and December 6, 2012, communications.
Because the petition requested immediate action, the PRB met internally on November 26, 2012, to review the request. The PRB denied the Petitioners request for immediate action on the basis that there was no immediate safety concern to Oyster Creek or to the health and safety of the public for the following reasons:
(1) On November 13, 2012,5 the FEMA concluded that offsite radiological emergency preparedness is adequate to provide "Reasonable Assurance," and that appropriate measures can be taken to protect the health and safety of the public, in the event of a radiological emergency at Oyster Creek in Ocean County, New Jersey.
(2) At the time, there were 3 emergency notification sirens inoperable out of a total of 42 emergency notification sirens, which does not exceed Exelon's reporting threshold of 25 percent or more sirens out of service. At the time, Exelon was working to restore the 3 inoperable sirens. FEMA's assessment determined that, in the areas where the sirens were determined to be inoperable, the FEMA-approved backup notification method of route alerting could be conducted, if needed.
(3) Hurricane Sandy did not exceed Oyster Creek's maximum flood level due to probable maximum hurricane (PMH). As reported in the Oyster Creek Final Safety Analysis Report (FSAR), Subsection 2.4.5, the maximum flood level due to PMH will be at elevation 22 feet (ft) mean sea level (MSL). The plant grade, elevation 23 ft MSL, is one foot above the PMH flood level. Therefore, the flood will not find its way into the plant buildings. The floor levels are generally 6 inches above grade at elevation 23 ft and 6 inches. The circulating water intake structure, with its deck at elevation 6 ft, will be under water. This deck supports, apart from the other equipment, the circulating water pumps and the emergency service water pumps. During a PMH flood, the circulating water and service water pumps will become inoperable. As such, emergency plant procedures have been instituted that require the plant to be shutdown when flood waters reach a pre-determined level, ensuring the capability for safe shutdown under normal or abnormal conditions.
(4) During a planned, routine inspection program, Exelon discovered control rod drive return nozzle safe end to pipe weld indications. These indications were determined to be surface in nature and did not result in any leakage. Exelon completed a structural weld overlay in accordance with the American Society of Mechanical Engineers (ASME)
Code.
The Petitioners were informed on November 26, 2012,6 via email of the PRB's decision to deny the Petitioners' request for immediate action to keep Oyster Creek to restarting after its refueling outage.
On November 28, 2012,7 the Petitioners requested to have a public meeting to address the PRB.
5 ADAMS Accession No. ML12319A627.
6 ADAMS Accession No. ML12331A345.
 
                                                -5 On November 30, 2012,8 the Petitioners requested information related to the reactor spray flange leak.
The NRC communicated with the Petitioners on November 30,2012,9 and December 6,2012,10 regarding arrangements for the public PRB meeting. The NRC informed the Petitioners that the public meeting would be held at the NRC Headquarters in Rockville, Maryland. The NRC also informed the Petitioners that the purpose of the public PRB meeting was to give the Petitioners an opportunity to provide any additional explanation or support for the petition before the PRB's initial consideration and recommendation. The public PRB meeting was not a hearing, nor was it an opportunity for the Petitioners to question or examine the PRB on the merits or the issues presented in the petition request. The NRC informed the Petitioners that no decisions regarding the merits of the petition will be made at the public PRB meeting.
On December 12, 2012,11 the NRC issued a public meeting notice for this meeting and placed it on the NRC public webpage.
On December 31, 2012,12 the Petitioners made a request for the NRC to provide all the documents that the NRC staff reviewed in its decision-making.
On January 2,2013,13 the NRC informed the Petitioners that the public meeting would be held at the NRC Headquarters in Rockville, Maryland. The NRC also outlined information on the purpose and format of the public PRB meeting as had been done in the November 30, and December 6, 2012, communications.
On January 3, 2013, 14 the Petitioners addressed the PRB to discuss the petition.
On January 3, 2013, 14 the Petitioners addressed the PRB to discuss the petition.
On January 10, 2013, 15 the NRC issued the Special Inspection Team (SIT) report regarding the emergency preparedness program performance and organizational decision-making associated with Oyster Creek's response to Hurricane Sandy on October 29 and 30, 2012. On January 11, 2013,16 the NRC informed the Petitioners that the NRC SIT report was issued and available to the public. On January 15, 2013,17 the NRC informed the Petitioners that the transcript of the public PRB meeting, held on January 3,2013, was available to the public. 7 ADAMS Accession No. ML 12338A234.
On January 10, 2013, 15 the NRC issued the Special Inspection Team (SIT) report regarding the emergency preparedness program performance and organizational decision-making associated with Oyster Creek's response to Hurricane Sandy on October 29 and 30, 2012.
8 ADAMS Accession No. ML 12338A240.
On January 11, 2013,16 the NRC informed the Petitioners that the NRC SIT report was issued and available to the public.
9 ADAMS Accession No. ML 12338A234.
On January 15, 2013,17 the NRC informed the Petitioners that the transcript of the public PRB meeting, held on January 3,2013, was available to the public.
10 ADAMS Accession No. ML 12341A299.
7 ADAMS Accession No. ML12338A234.
11 ADAMS Accession No. ML 12340A493.
8 ADAMS Accession No. ML12338A240.
12 ADAMS Accession No. ML 13002A150.
9 ADAMS Accession No. ML12338A234.
13 ADAMS Accession No. ML 13002A159.
10 ADAMS Accession No. ML12341A299.
14 ADAMS Accession No. ML 13007A084.
11 ADAMS Accession No. ML12340A493.
15 ADAMS Accession No. ML 13010A470.
12 ADAMS Accession No. ML13002A150.
16 ADAIVIS Accession No. ML 13015A626.
13 ADAMS Accession No. ML13002A159.
17 ADAMS Accession No. ML 13015A635.
14 ADAMS Accession No. ML13007A084.
-6 On January 15, 2013,18 the Petitioners acknowledged reading the SIT report, but the Petitioners had a question regarding service water cooling to the Oyster Creek emergency diesel generators (EDGs). On January 15, 2013,19 the NRC responded to the Petitioners' questions regarding service water cooling to the Oyster Creek EDGs. On April 3, 2013, the PRB met and made an initial recommendation.
15 ADAMS Accession No. ML13010A470.
16 ADAIVIS Accession No. ML13015A626.
17 ADAMS Accession No. ML13015A635.
 
                                                -6 On January 15, 2013,18 the Petitioners acknowledged reading the SIT report, but the Petitioners had a question regarding service water cooling to the Oyster Creek emergency diesel generators (EDGs).
On January 15, 2013,19 the NRC responded to the Petitioners' questions regarding service water cooling to the Oyster Creek EDGs.
On April 3, 2013, the PRB met and made an initial recommendation.
On April 5, 2013,20 the NRC informed the Petitioners of the PRB's initial recommendation.
On April 5, 2013,20 the NRC informed the Petitioners of the PRB's initial recommendation.
On April 11, 2013,21 the NRC responded to questions from the Petitioners and offered the Petitioners a public meeting or a conference call to further address the PRB. The Petitioners elected to present supplemental information to the PRB via a conference call. On April 18, 2013,22the Petitioners addressed the PRB via a conference call that was transcribed by a court reporter, made available to the public, and became part of the Petition.
On April 11, 2013,21 the NRC responded to questions from the Petitioners and offered the Petitioners a public meeting or a conference call to further address the PRB. The Petitioners elected to present supplemental information to the PRB via a conference call.
On April 18, 2013,22the Petitioners addressed the PRB via a conference call that was transcribed by a court reporter, made available to the public, and became part of the Petition.
On June 17, 2013, the PRB held an internal meeting to discuss the supplemental information provided on April 18, 2013, and to make a final recommendation.
On June 17, 2013, the PRB held an internal meeting to discuss the supplemental information provided on April 18, 2013, and to make a final recommendation.
RESPONSES Sirens Oyster Creek has 42 emergency notification sirens. NRC Event Report 48450 incorrectly stated that there are 43 emergency notification sirens and that 36 sirens out of 43 were out of service. At the height of the storm, 39 sirens were out of service. Event Report 48495 stated that 11 emergency notification sirens were inoperable out of a total of 42 emergency notification sirens, which exceeded Exelon's reporting threshold of 25 percent or more sirens out of service. Therefore, Exelon made an 8-hour report, as required under 10 CFR 50. 72(b )(3)(xiii) due to the "Loss of Emergency Preparedness Capabilities." Currently, all emergency notification sirens are operable.
RESPONSES Sirens Oyster Creek has 42 emergency notification sirens. NRC Event Report 48450 incorrectly stated that there are 43 emergency notification sirens and that 36 sirens out of 43 were out of service.
FEMA's assessment determined that, in the areas where the sirens were determined to be inoperable, the FEMA-approved backup notification method of route alerting could be conducted, if needed. With regard to back-up power for the sirens, Exelon has installed 42 new sirens with battery back-up at Oyster Creek, and Exelon is working with the State of New Jersey to get FEMA to accept the new sirens with battery backup capability.
At the height of the storm, 39 sirens were out of service. Event Report 48495 stated that 11 emergency notification sirens were inoperable out of a total of 42 emergency notification sirens, which exceeded Exelon's reporting threshold of 25 percent or more sirens out of service.
Following acceptance by FEMA, the sirens will be placed in service and the old sirens will be removed; this expected by the end of December 2013. The Petitioners requested that the NRC review whether Exelon had an obligation pursuant to 10 CFR 50.72(b)(3)(viii) to include in its event reports information regarding degraded emergency response that went beyond reporting of the siren failures.
Therefore, Exelon made an 8-hour report, as required under 10 CFR 50. 72(b )(3)(xiii) due to the "Loss of Emergency Preparedness Capabilities." Currently, all emergency notification sirens are operable.
10 CFR 50.72(b)(3)(xiii) 18 ADAMS Accession No. ML 13015A626.
FEMA's assessment determined that, in the areas where the sirens were determined to be inoperable, the FEMA-approved backup notification method of route alerting could be conducted, if needed. With regard to back-up power for the sirens, Exelon has installed 42 new sirens with battery back-up at Oyster Creek, and Exelon is working with the State of New Jersey to get FEMA to accept the new sirens with battery backup capability. Following acceptance by FEMA, the sirens will be placed in service and the old sirens will be removed; this expected by the end of December 2013.
19 ADAMS Accession No. ML 13015A676.
The Petitioners requested that the NRC review whether Exelon had an obligation pursuant to 10 CFR 50.72(b)(3)(viii) to include in its event reports information regarding degraded emergency response that went beyond reporting of the siren failures. 10 CFR 50.72(b)(3)(xiii) 18 ADAMS   Accession No. ML13015A626.
20 ADAMS Accession No. ML 13098A200.
19 ADAMS   Accession No. ML13015A676.
21 ADAMS Accession No. ML 13105A431.
20 ADAMS   Accession No. ML13098A200.
22 ADAMS Accession No. ML 13127A253.
21 ADAMS   Accession No. ML13105A431.
-7 states the following:  
22 ADAMS   Accession No. ML13127A253.
"[a]ny event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of control room indication, Emergency Notification System, or offsite notification system)." In the SIT Report, the NRC inspectors interviewed personnel, reviewed various procedures, logs, critiques and corrective action program documents to assess whether equipment, human performance and programmatic issues related to emergency action level event declarations, the activation of Oyster Creek's emergency response organization and Oyster Creek's preparedness for the hurricane were appropriately identified and entered into the corrective action program. No findings were identified.
 
Also, Exelon had no obligation pursuant to 10 CFR 50. 72(b )(3)(xiii) to include in its event reports information regarding degraded emergency response that went beyond reporting siren failures.
                                                  -7 states the following: "[a]ny event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of control room indication, Emergency Notification System, or offsite notification system)." In the SIT Report, the NRC inspectors interviewed personnel, reviewed various procedures, logs, critiques and corrective action program documents to assess whether equipment, human performance and programmatic issues related to emergency action level event declarations, the activation of Oyster Creek's emergency response organization and Oyster Creek's preparedness for the hurricane were appropriately identified and entered into the corrective action program. No findings were identified. Also, Exelon had no obligation pursuant to 10 CFR 50. 72(b )(3)(xiii) to include in its event reports information regarding degraded emergency response that went beyond reporting siren failures. In addition, FEMA and the State of New Jersey have jurisdiction, not the NRC, in evacuation capability, and determined there was no degradation of emergency responses and/or evacuations.
In addition, FEMA and the State of New Jersey have jurisdiction, not the NRC, in evacuation capability, and determined there was no degradation of emergency responses and/or evacuations.
This issue was addressed in the following documents:
This issue was addressed in the following documents:
* an email dated November 13,2012 (see footnote 5);
* an email dated November 13,2012 (see footnote 5);
* SIT report dated January 10, 2013 (see footnote 15);
* SIT report dated January 10, 2013 (see footnote 15);
* Quarterly Inspection Report dated January 31,2013;23 and
* Quarterly Inspection Report dated January 31,2013;23 and
* letter dated February 22,2013.24 Emergency Preparedness On November 13, 2012, FEMA concluded that offsite radiological emergency preparedness is adequate to provide "Reasonable Assurance," and that appropriate measures can be taken to protect the health and safety of the public, in the event of a radiological emergency at Oyster Creek in Ocean County, New Jersey. The New Jersey Office of Emergency Management personnel have personally inspected all emergency response-related facilities within, and support the 10-mile Emergency Planning Zone (EPZ). FEMA Region II accompanied some of the inspections to verify that the emergency response facilities and infrastructure are intact and/or have been returned to service. FEMA is continuing to work with the State of New Jersey and the EPZ county to ensure that they are able to maintain reasonable assurance and institute any necessary compensatory measures, as they also deal with the needs of real world disaster response (44 CFR 350.13) in the aftermath of Hurricane Sandy and the subsequent Nor'easter.
* letter dated February 22,2013. 24 Emergency Preparedness On November 13, 2012, FEMA concluded that offsite radiological emergency preparedness is adequate to provide "Reasonable Assurance," and that appropriate measures can be taken to protect the health and safety of the public, in the event of a radiological emergency at Oyster Creek in Ocean County, New Jersey.
The NRC staff held several discussions with the State of New Jersey and FEMA regarding offsite radiological emergency preparedness.
The New Jersey Office of Emergency Management personnel have personally inspected all emergency response-related facilities within, and support the 10-mile Emergency Planning Zone (EPZ). FEMA Region II accompanied some of the inspections to verify that the emergency response facilities and infrastructure are intact and/or have been returned to service. FEMA is continuing to work with the State of New Jersey and the EPZ county to ensure that they are able to maintain reasonable assurance and institute any necessary compensatory measures, as they also deal with the needs of real world disaster response (44 CFR 350.13) in the aftermath of Hurricane Sandy and the subsequent Nor'easter.
Based on the discussions and the NRC staff observations during Hurricane Sandy and during the aftermath, the FEMA and the State of New Jersey conclusions that offsite radiological emergency preparedness is adequate.
The NRC staff held several discussions with the State of New Jersey and FEMA regarding offsite radiological emergency preparedness. Based on the discussions and the NRC staff observations during Hurricane Sandy and during the aftermath, the FEMA and the State of New Jersey conclusions that offsite radiological emergency preparedness is adequate.
23 ADAMS Accession No. ML 13031A540.
23 ADAMS Accession No. ML13031A540.
24 ADAMS Accession No. ML 13035A261.
24 ADAMS Accession No. ML13035A261.
-This issue was addressed in the following documents:
 
                                                  - 8 This issue was addressed in the following documents:
* an email dated November 13,2012 (see footnote 5);
* an email dated November 13,2012 (see footnote 5);
* SIT report dated January 10,2013 (see footnote 15);
* SIT report dated January 10,2013 (see footnote 15);
* Quarterly Inspection Report dated January 31, 2013 (see footnote 23); and
* Quarterly Inspection Report dated January 31, 2013 (see footnote 23); and
* letter dated February 22, 2013 (see footnote 24). Flooding Oyster Creek remained within its licensing basis during Hurricane Sandy. Hurricane Sandy did not exceed Oyster Creek's maximum flood level due to PMH. As reported in the Oyster Creek FSAR, Subsection 2.4.5, the maximum flood level due to PMH will be at elevation 22 ft MSL. The plant grade, elevation 23 ft MSL, is one foot above the PMH flood level. Therefore, the flood will not find its way into the plant buildings.
* letter dated February 22, 2013 (see footnote 24).
The floor levels are generally 6 inches above grade at elevation 23 ft and 6 inches. The circulating water intake structure, with its deck at elevation 6 ft, will be under water. This deck supports, apart from the other equipment, the circulating water pumps and the emergency service water pumps. During a PMH flood, the circulating water and service water pumps will become inoperable.
Flooding Oyster Creek remained within its licensing basis during Hurricane Sandy. Hurricane Sandy did not exceed Oyster Creek's maximum flood level due to PMH. As reported in the Oyster Creek FSAR, Subsection 2.4.5, the maximum flood level due to PMH will be at elevation 22 ft MSL.
As such, emergency plant procedures have been instituted that require the plant to be shutdown when flood waters reach a pre-determined level, ensuring the capability for safe shutdown under normal or abnormal conditions.
The plant grade, elevation 23 ft MSL, is one foot above the PMH flood level. Therefore, the flood will not find its way into the plant buildings. The floor levels are generally 6 inches above grade at elevation 23 ft and 6 inches. The circulating water intake structure, with its deck at elevation 6 ft, will be under water. This deck supports, apart from the other equipment, the circulating water pumps and the emergency service water pumps. During a PMH flood, the circulating water and service water pumps will become inoperable. As such, emergency plant procedures have been instituted that require the plant to be shutdown when flood waters reach a pre-determined level, ensuring the capability for safe shutdown under normal or abnormal conditions.
The NRC updated part of its March 12,2012, request for information from all U.S. nuclear power plants, setting out a schedule for completing flooding hazard re-evaluations recommended by the NRC's Near-Term Task Force, which examined lessons learned from the Fukushima Dai-ichi nuclear accident.
The NRC updated part of its March 12,2012, request for information from all U.S. nuclear power plants, setting out a schedule for completing flooding hazard re-evaluations recommended by the NRC's Near-Term Task Force, which examined lessons learned from the Fukushima Dai-ichi nuclear accident.
From the NRC Press Release No. 12-055, "NRC Prioritizes Industry Responses to Request for Post-Fukushima Flood Hazard Evaluations," dated May 11,2012: "The information in front of us today shows U.S. plants are capable of safely handling the most likely floods at their sites. These re-evaluations will help us better understand the very unlikely flooding that could occur in the future," said Eric Leeds, director of the NRC's Office of Nuclear Reactor Regulation. "We've publicly discussed the prioritization process several times since we issued the information request. and this schedule provides a solid path towards getting the work done correctly and efficiently." The prioritization schedule, outlined in a letter to every plant owner. gives plants 1, 2, or 3 years to complete the hazard evaluations.
From the NRC Press Release No. 12-055, "NRC Prioritizes Industry Responses to Request for Post-Fukushima Flood Hazard Evaluations," dated May 11,2012:
Oyster Creek has until March 12, 2015, to complete the flooding re-evaluation.
        "The information in front of us today shows U.S. plants are capable of safely handling the most likely floods at their sites. These re-evaluations will help us better understand the very unlikely flooding that could occur in the future," said Eric Leeds, director of the NRC's Office of Nuclear Reactor Regulation. "We've publicly discussed the prioritization process several times since we issued the information request. and this schedule provides a solid path towards getting the work done correctly and efficiently."
The prioritization schedule, outlined in a letter to every plant owner. gives plants 1, 2, or 3 years to complete the hazard evaluations. Oyster Creek has until March 12, 2015, to complete the flooding re-evaluation.
The design-basis flood height at Oyster Creek is 22 ft. On page 5 of the NRC SIT Report, dated January 10, 2013, it states the following:
The design-basis flood height at Oyster Creek is 22 ft. On page 5 of the NRC SIT Report, dated January 10, 2013, it states the following:
At approximately 12:18 a.m. on October 30,2012, the maximum intake level of 7.4 feet was reached as determined by water level measurements above the base of the service water pumps. Water levels remained below the service water pump motors and well below the design basis flood height of greater than 22 feet
At approximately 12:18 a.m. on October 30,2012, the maximum intake level of 7.4 feet was reached as determined by water level measurements above the base of the service water pumps. Water levels remained below the service water pump motors and well below the design basis flood height of greater than 22 feet
-9 that is documented in UFSAR [Updated Final Safety Analysis Report] section 2.4.5.4. The EDGs at Oyster Creek are not dependent on service water for cooling. The EDGs use a fan/radiator assembly for cooling, exactly like a car does. At Oyster Creek, if the service water pumps are unavailable, this has no effect on the EDGs ability to fulfill its design function.
 
On October 29,2012, offsite power to Oyster Creek was lost at 8:18 PM, and operators entered procedure ABN-36, "Loss of Offsite Power." EDGs automatically started on the loss of offsite power. The EDGs were automatically aligned to restore power to the emergency busses. Oyster Creek has two EDGs. The EDGs are independent of each other, with the exception of a common bulk fuel storage supply, and are provided with auxiliary systems to ensure reliable starting and continuous operation with no operator attention.
                                                -9 that is documented in UFSAR [Updated Final Safety Analysis Report] section 2.4.5.4.
Power to start the units is contained and is not dependent on the availability of any other source of normal plant power at the moment of starting.
The EDGs at Oyster Creek are not dependent on service water for cooling. The EDGs use a fan/radiator assembly for cooling, exactly like a car does. At Oyster Creek, if the service water pumps are unavailable, this has no effect on the EDGs ability to fulfill its design function. On October 29,2012, offsite power to Oyster Creek was lost at 8:18 PM, and operators entered procedure ABN-36, "Loss of Offsite Power." EDGs automatically started on the loss of offsite power. The EDGs were automatically aligned to restore power to the emergency busses.
The two EDGs are located in the Diesel Generator Building, which is a separate reinforced concrete structure, and it is located at the 23 ft elevation.
Oyster Creek has two EDGs. The EDGs are independent of each other, with the exception of a common bulk fuel storage supply, and are provided with auxiliary systems to ensure reliable starting and continuous operation with no operator attention. Power to start the units is self contained and is not dependent on the availability of any other source of normal plant power at the moment of starting. The two EDGs are located in the Diesel Generator Building, which is a separate reinforced concrete structure, and it is located at the 23 ft elevation. Each unit and its auxiliaries is located in a separate room within the Diesel Generator Building. A 15,150 gallon Diesel Generator Fuel Storage Tank was sized to provide 3 days of fuel supply. The tank is maintained above a level corresponding to a capacity of 14,000 gallons by manually transferring fuel from a 75,000 gallon fuel oil tank, located directly east of the boiler house located at the 23 ft elevation.
Each unit and its auxiliaries is located in a separate room within the Diesel Generator Building.
The water levels reached 7.4 ft at the plant's water intake structure, so some electrical cabling was flooded. Exelon performed an inspection and surveillance tests to ensure operability of the electrical components. No safety-related electrical infrastructure was wetted. Motors were above the flood level. Cabling is enclosed in conduits. In addition to being enclosed in conduit, 4 safety-related power cables have been replaced with Okonite cables that are rated for submergence. This is a project that Exelon has been working over the past couple of years and is not related to the effects of Sandy. Cables used at Oyster Creek are not like Romex wiring used in homes. Oyster Creek cables are tested periodically, meggared and thermography is performed looking for hot spots which would indicate increased resistance due to corrosion.
A 15,150 gallon Diesel Generator Fuel Storage Tank was sized to provide 3 days of fuel supply. The tank is maintained above a level corresponding to a capacity of 14,000 gallons by manually transferring fuel from a 75,000 gallon fuel oil tank, located directly east of the boiler house located at the 23 ft elevation.
Exelon cleaned and meggared a motor control center that has controls/breakers for low pressure and high pressure screen wash pumps and the traveling screens.
The water levels reached 7.4 ft at the plant's water intake structure, so some electrical cabling was flooded. Exelon performed an inspection and surveillance tests to ensure operability of the electrical components.
The NRC had a hydrologist. independent of the PRB, review the flooding that occurred at Oyster Creek during Hurricane Sandy to determine if the plant continued to meet its design and licensing basis. The hydrologist report25 concluded that Hurricane Sandy never exceeded the design-basis flood parameters for Oyster Creek. The PMH parameters used in the calculation of the 23 ft storm surge is conservative, based on the water level observed during Hurricane Sandy and storm surge studies conducted in 2000 using the Empirical Simulation Technique.
No safety-related electrical infrastructure was wetted. Motors were above the flood level. Cabling is enclosed in conduits.
In addition to being enclosed in conduit, 4 safety-related power cables have been replaced with Okonite cables that are rated for submergence.
This is a project that Exelon has been working over the past couple of years and is not related to the effects of Sandy. Cables used at Oyster Creek are not like Romex wiring used in homes. Oyster Creek cables are tested periodically, meggared and thermography is performed looking for hot spots which would indicate increased resistance due to corrosion.
Exelon cleaned and meggared a motor control center that has controls/breakers for low pressure and high pressure screen wash pumps and the traveling screens. The NRC had a hydrologist.
independent of the PRB, review the flooding that occurred at Oyster Creek during Hurricane Sandy to determine if the plant continued to meet its design and licensing basis. The hydrologist report 25 concluded that Hurricane Sandy never exceeded the design-basis flood parameters for Oyster Creek. The PMH parameters used in the calculation of the 23 ft storm surge is conservative, based on the water level observed during Hurricane Sandy and storm surge studies conducted in 2000 using the Empirical Simulation Technique.
The post-Fukushima safety reviews of the current operating nuclear power plants is addressing the site flooding characteristics using the state-of-the-art methodology, as well as emergency procedures.
The post-Fukushima safety reviews of the current operating nuclear power plants is addressing the site flooding characteristics using the state-of-the-art methodology, as well as emergency procedures.
25 ADAMS Accession No. ML 13127A239,
25 ADAMS Accession No. ML13127A239,
-GDC-2, "Design Bases for Protection Against Natural Phenomena," states: Structures, systems, and components important to safety shall be designed to withstand the effects of natural phenomena such as earthquakes, tornadoes, hurricanes, floods, tsunami, and seiches without loss of capability to perform their safety functions, The design bases for these structures, systems, and components shall reflect: (1) Appropriate consideration of the most severe of the natural phenomena that have been historically reported for the site and surrounding area, with sufficient margin for the limited accuracy, quantity, and period of time in which the historical data have been accumulated, (2) appropriate combinations of the effects of normal and accident conditions with the effects of the natural phenomena and (3) the importance of the safety functions to be performed.
 
In the SIT Report, it states: "At approximately 12:18 a,m. on October 30,2012, the maximum intake level of 7,4 ft was reached as determined by water level measurements above the base of the service water pumps. Water levels remained below the service water pump motors and well below the design basis flood height of greater than 22 ft that is documented in UFSAR section 2,4.5,4," The Petitioners questioned how decay heat would be removed if the circulating water pumps are not working during a flood event The Isolation Condenser System provides a backup heat sink for reactor heat when the main condenser is unavailable, The system provides a natural circulation heat transfer path for the reactor coolant system, with heat transferred to the environment by boiling secondary-side water in the isolation condensers and venting steam directly to atmosphere, This issue was addressed in the following documents:
                                                - 10 GDC-2, "Design Bases for Protection Against Natural Phenomena," states:
Structures, systems, and components important to safety shall be designed to withstand the effects of natural phenomena such as earthquakes, tornadoes, hurricanes, floods, tsunami, and seiches without loss of capability to perform their safety functions, The design bases for these structures, systems, and components shall reflect: (1) Appropriate consideration of the most severe of the natural phenomena that have been historically reported for the site and surrounding area, with sufficient margin for the limited accuracy, quantity, and period of time in which the historical data have been accumulated, (2) appropriate combinations of the effects of normal and accident conditions with the effects of the natural phenomena and (3) the importance of the safety functions to be performed.
In the SIT Report, it states: "At approximately 12:18 a,m. on October 30,2012, the maximum intake level of 7,4 ft was reached as determined by water level measurements above the base of the service water pumps. Water levels remained below the service water pump motors and well below the design basis flood height of greater than 22 ft that is documented in UFSAR section 2,4.5,4,"
The Petitioners questioned how decay heat would be removed if the circulating water pumps are not working during a flood event The Isolation Condenser System provides a backup heat sink for reactor heat when the main condenser is unavailable, The system provides a natural circulation heat transfer path for the reactor coolant system, with heat transferred to the environment by boiling secondary-side water in the isolation condensers and venting steam directly to atmosphere, This issue was addressed in the following documents:
* SIT report dated January 10, 2013 (see footnote 15);
* SIT report dated January 10, 2013 (see footnote 15);
* Quarterly Inspection Report dated January 31, 2013 (see footnote 23); and
* Quarterly Inspection Report dated January 31, 2013 (see footnote 23); and
* letter dated February 22,2013 (see footnote 24). Dry Cask Storage The base of the dry cask storage is located at 23 ft elevation and the water levels reached 7,4 ft during Hurricane Sandy. Therefore, the dry cask storage was never compromised at any point during Hurricane Sandy, This issue was addressed in the following documents:
* letter dated February 22,2013 (see footnote 24).
Dry Cask Storage The base of the dry cask storage is located at 23 ft elevation and the water levels reached 7,4 ft during Hurricane Sandy. Therefore, the dry cask storage was never compromised at any point during Hurricane Sandy, This issue was addressed in the following documents:
* Quarterly Inspection Report dated January 31, 2013 (see footnote 23); and
* Quarterly Inspection Report dated January 31, 2013 (see footnote 23); and
* letter dated February 22, 2013 (see footnote 24). Event Reports 48491 and 48537 On November 7,2012, during a planned, routine inspection program, General Electric notified the Oyster Creek management of surface indications that were detected by dye penetrant testing. The indications were in the adjacent base material area of the system pressure boundary weld. The indications were located top dead center of the 3 inch pipe,
* letter dated February 22, 2013 (see footnote 24).
-11 Indication No.1 was upstream 0.7 inches away from the weld toe; the indication is 1.5 inches long. Indication No.2 was downstream  
Event Reports 48491 and 48537 On November 7,2012, during a planned, routine inspection program, General Electric notified the Oyster Creek management of surface indications that were detected by dye penetrant testing. The indications were in the adjacent base material area of the system pressure boundary weld. The indications were located top dead center of the 3 inch pipe,
 
                                                    - 11 Indication No.1 was upstream 0.7 inches away from the weld toe; the indication is 1.5 inches long. Indication No.2 was downstream 0.2 inches away from the weld toe; the indication is 2.5 inches long. The indications were determined to be surface in nature and did not result in any leakage. Exelon completed a structural weld overlay in accordance with the ASME Code. On January 7,2013,26 Exelon submitted a Licensee Event Report (LER) 2012-003-00, "Indications Identified in the Control Rod Drive Return Nozzle (N9)." Exelon stated that U[t]he most probable cause of the surface indications was determined to be outside diameter stress corrosion cracking." Exelon concluded that the N9 nozzle weld overlay can safely operate for one operating cycle of 24 months and subsequent analysis will be performed to support safe operation for continued operating cycles.
On November 26,2012, the licensee discovered a pinhole leak on a Reactor Head Spray line flange during the Nuclear Steam Supply System Leak Test. Water was found to be weeping from the pinhole leak (approximately 2 to 3 drops per minute). The licensee performed an ASME code repair. The licensee also revised the Oyster Creek Reactor Pressure Vessel Disassembly procedure to improve guidance and appropriate cautions for the Reactor Head Cooling (RHC) flange. On January 25, 2013, Exelon submitted LER 2012-005-00, "Flange Leakage Found During NSSS [Nuclear Steam Supply System] Leak Test." Exelon stated, U[t]he most probable cause of the leak is due to the flange weld-base metal being subject to additional mechanical and thermal stress of the design of the flange." The licensee states that mechanical and thermal stresses outside of the design of the flange, initiated by a 2008 event, were likely to have resulted in the pinhole leakage. LER 2012-005-00 states:
In 2008, during reactor disassembly (mirror insulation removal), an incorrect flange was disconnected from the reactor head instead of the 2 inch RHC flange, which should have been disconnected. Due to the RHC flange still being connected, the flange was stressed and the RHC piping was bent when an attempt was made to remove the RHC piping and mirror insulation from the reactor head using the overhead crane. There was no indication of damage to the RHC flange at the time of this event. A large portion of the piping up to the N-7B nozzle was replaced. Based on finding no indication of damage, the RHC flange was not replaced .... It is highly likely that the additional mechanical stress introduced an undetectable indication. Thermal cycling resulted in the base metal microstructure expanding and contracting, promoting propagation and growth of the metal indications. Based on the source of the leakage being identified as through-wall indication in the base metal, the most probable cause of the flange leakage was due to an undetectable indication initiated in 2008, which propagated over time into a through-wall leak by thermal cycling and additional mechanical stresses.
The objective of the NRC Inspection Manual Inspection Procedure IP-71003, "Post-Approval Site Inspection for License Renewal," is to verify the license conditions added as part of the renewed operating license, regulatory commitments, selected AMPs, and time limited aging analyses are implemented and/or completed in accordance with 10 CFR Part 54, "Requirements for the Renewal of Operating Licenses for Nuclear Power Plants."
The NRC staff has not found a problem with the licensee's AMP.
26 ADAMS Accession No. ML13025A082.


===0.2 inches===
                                                - 12 The NRC staff performed inspections and reviewed both ASME code repair packages.
away from the weld toe; the indication is 2.5 inches long. The indications were determined to be surface in nature and did not result in any leakage. Exelon completed a structural weld overlay in accordance with the ASME Code. On January 7,2013,26 Exelon submitted a Licensee Event Report (LER) 2012-003-00, "Indications Identified in the Control Rod Drive Return Nozzle (N9)." Exelon stated that U[t]he most probable cause of the surface indications was determined to be outside diameter stress corrosion cracking." Exelon concluded that the N9 nozzle weld overlay can safely operate for one operating cycle of 24 months and subsequent analysis will be performed to support safe operation for continued operating cycles. On November 26,2012, the licensee discovered a pinhole leak on a Reactor Head Spray line flange during the Nuclear Steam Supply System Leak Test. Water was found to be weeping from the pinhole leak (approximately 2 to 3 drops per minute). The licensee performed an ASME code repair. The licensee also revised the Oyster Creek Reactor Pressure Vessel Disassembly procedure to improve guidance and appropriate cautions for the Reactor Head Cooling (RHC) flange. On January 25, 2013, Exelon submitted LER 2012-005-00, "Flange Leakage Found During NSSS [Nuclear Steam Supply System] Leak Test." Exelon stated, U[t]he most probable cause of the leak is due to the flange weld-base metal being subject to additional mechanical and thermal stress of the design of the flange." The licensee states that mechanical and thermal stresses outside of the design of the flange, initiated by a 2008 event, were likely to have resulted in the pinhole leakage. LER 2012-005-00 states: In 2008, during reactor disassembly (mirror insulation removal), an incorrect flange was disconnected from the reactor head instead of the 2 inch RHC flange, which should have been disconnected.
Due to the RHC flange still being connected, the flange was stressed and the RHC piping was bent when an attempt was made to remove the RHC piping and mirror insulation from the reactor head using the overhead crane. There was no indication of damage to the RHC flange at the time of this event. A large portion of the piping up to the N-7B nozzle was replaced.
Based on finding no indication of damage, the RHC flange was not replaced .... It is highly likely that the additional mechanical stress introduced an undetectable indication.
Thermal cycling resulted in the base metal microstructure expanding and contracting, promoting propagation and growth of the metal indications.
Based on the source of the leakage being identified as through-wall indication in the base metal, the most probable cause of the flange leakage was due to an undetectable indication initiated in 2008, which propagated over time into a through-wall leak by thermal cycling and additional mechanical stresses.
The objective of the NRC Inspection Manual Inspection Procedure IP-71003, "Post-Approval Site Inspection for License Renewal," is to verify the license conditions added as part of the renewed operating license, regulatory commitments, selected AMPs, and time limited aging analyses are implemented and/or completed in accordance with 10 CFR Part 54, "Requirements for the Renewal of Operating Licenses for Nuclear Power Plants." The NRC staff has not found a problem with the licensee's AMP. 26 ADAMS Accession No. ML 13025A082. 
-The NRC staff performed inspections and reviewed both ASME code repair packages.
The NRC provides ongoing oversight of the safety of Oyster Creek. One of the programs the NRC employs to provide that oversight is the Reactor Oversight Process (ROP). The ROP uses a variety of tools and inspection techniques to monitor and evaluate the licensee performance.
The NRC provides ongoing oversight of the safety of Oyster Creek. One of the programs the NRC employs to provide that oversight is the Reactor Oversight Process (ROP). The ROP uses a variety of tools and inspection techniques to monitor and evaluate the licensee performance.
The process focuses on those plant activities that are most important to safety. The NRC Inspectors onsite at Oyster Creek look at thousands of pages of documents in the course of their duties. NRC Inspectors review procedures, emergency response organization records, issue reports, corrective action packages, work packages, surveillance testing, control room operators' narrative logs, interview station personnel, and various technical documents.
The process focuses on those plant activities that are most important to safety. The NRC Inspectors onsite at Oyster Creek look at thousands of pages of documents in the course of their duties. NRC Inspectors review procedures, emergency response organization records, issue reports, corrective action packages, work packages, surveillance testing, control room operators' narrative logs, interview station personnel, and various technical documents. The documents related to: (1) the control rod drive return nozzle safe end to pipe weld indications; and (2) the reactor head spray line flange, have not been submitted to the NRC. As such, the documents are not in the NRC possession, but they are available for inspection. The NRC Inspectors have reviewed the documents. The State of New Jersey Department of Environmental Protection personnel have access to Oyster Creek and can review Exelon's documents.
The documents related to: (1) the control rod drive return nozzle safe end to pipe weld indications; and (2) the reactor head spray line flange, have not been submitted to the NRC. As such, the documents are not in the NRC possession, but they are available for inspection.
The NRC Inspectors have reviewed the documents.
The State of New Jersey Department of Environmental Protection personnel have access to Oyster Creek and can review Exelon's documents.
This issue was addressed in the following documents:
This issue was addressed in the following documents:
* SIT report dated January 10, 2013 (see footnote 15);
* SIT report dated January 10, 2013 (see footnote 15);
* Quarterly Inspection Report dated January 31, 2013 (see footnote 23); and
* Quarterly Inspection Report dated January 31, 2013 (see footnote 23); and
* letter dated February 22, 2013 (see footnote 24). Internal PRB Meeting During the public meeting, held on January 3, 2013, the Petitioners requested that the NRC staff make the staff presentation to the PRB a public meeting. The Petitioners were informed at the meeting held on January 3, 2013, that the staff presentation to the PRB is an internal meeting. The PRB decided that the staff presentation would remain, consistent with Management Directive 8.11, an internal meeting.
* letter dated February 22, 2013 (see footnote 24).
R Webster Enclosed are the detailed PRB's responses to the issues raised in your petition, as supplemented.
Internal PRB Meeting During the public meeting, held on January 3, 2013, the Petitioners requested that the NRC staff make the staff presentation to the PRB a public meeting. The Petitioners were informed at the meeting held on January 3, 2013, that the staff presentation to the PRB is an internal meeting.
Thank you for bringing these issues to the attention of the NRC. Sincerely, Ira! Allen Howe, Deputy Director Division of Inspection and Regional Support Office of Nuclear Reactor Regulation Docket No: 50-219
The PRB decided that the staff presentation would remain, consistent with Management Directive 8.11, an internal meeting.
 
==Enclosure:==


As stated Licensee (w/copy of incoming 2.206 request) Listserv DISTRIBUTION:
ML13128A221
G20120902 PUBLIC RidsNrrLABaxter Resource Branch Reading RdisNrrPMOysterCreek Resource RidsEdoMailCenter Resource RidsOpaMail Resource RidsNrrOd Resource RidsOcaMailCenter Resource RidsNrrDorl Resource RidsNrrMailCenter Resource RidsNrrDorlLpl1-2 Resource RidsRgn1 MailCenter Resource ADAMS Accession No.
* via email OFFICE         NRRlDORLJLPL1-2IPM NRRlDORLJLPL1-21l.A   NRRlDPRlPGCB       NRRlDORLJLPL1-2/BC(A) DIRS/DD JLamb             ABaxter* w/comments   TMensah*           VRodriguez           AHowe 06/19/2013         06119/2013           06/1812013         06/2412013           06/26/2013}}
* via email OFFICE NRRlDORLJLPL1-2IPM NRRlDORLJLPL1-21l.A NRRlDPRlPGCB NRRlDORLJLPL1-2/BC(A)
DIRS/DD JLamb ABaxter* w/comments TMensah* VRodriguez AHowe 06/19/2013 06119/2013 06/1812013 06/2412013 06/26/2013 OFFICIAL RECORD COPY}}

Latest revision as of 06:02, 6 February 2020

2.206 Petition Closure Letter
ML13128A221
Person / Time
Site: Oyster Creek
Issue date: 06/26/2013
From: Howe A
Division of Inspection and Regional Support
To: Webster R
Environmental Enforcement Project, Grandmothers, Mothers & More for Energy Safety, New Jersey Environmental Federation, Public Justice P C
Lamb J
References
2.206, G20120902
Download: ML13128A221 (16)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20555*0001 June 26, 2013 Mr. Richard Webster, Counsel GRAMMES and NJEF Power-Cotchett Attorney Environmental Enforcement Project, Public Justice Public Justice Center 500 E. Lexington Street Baltimore, MD 21202

Dear Mr. Webster:

I am responding to your petition dated November 19,2012, and supplemented on November 30,2012, January 3,2013, and April 18, 2013.1 Your petition, which was addressed to Dr. Allison M. Macfarlane, was referred to the Office of Nuclear Reactor Regulation (NRR) pursuant to Section 2.206 of Title 10 of the Code of Federal Regulations (10 CFR 2.206) of the U.S. Nuclear Regulatory Commission's (NRC's) regulations.

Management Directive (MD) 8.11, which is publicly available,2 describes the NRC's review process for 10 CFR 2.206 petitions.

The New Jersey Environmental Federation, the Grandmothers, Mothers, and More for Energy Safety, and Beyond Nuclear, Inc. (collectively Petitioners) submitted an emergency 2.206 petition regarding lack of adequate protection of safety at Oyster Creek Nuclear Generating Station (Oyster Creek). Oyster Creek is owned by Exelon Generation Company, LLC (Exelon or the licensee). Your petition was filed under 10 CFR 2.206 because you requested that the NRC keep Oyster Creek from restarting until the following conditions were met:

(1) The evacuation plan is updated to reflect the new reality post-Sandy including evacuation shelters, blocked roads, emergency responders farther away and more distracted. etc.; and the sirens are repaired; (2) The design storm for flood defense purposes is updated to reflect the recent spate of storms and climate change and, additional flood protection is put in place as appropriate; (3) The "indications" (cracks or their precursors) are investigated ... and the public is assured through release of additional data ... and analysis ...

they pose no additional risk of a nuclear catastrophe; 1 Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML12326A361.

ML12338A246, ML13015A144, and ML13127A253, respectively.

2 ADAMS Accession No. ML041770328.

R. Webster -2 (4) Exelon reviews whether the indications were predicted by its modeling and whether it can predict that no problematic indications will develop before the next inspection cycle and proof of ability to predict fatigue ...

accurately is released to the public; and (5) To ensure transparency, a public meeting with NRC is held at which staff can satisfactorily answer the public's concerns, including those above.

On November 23, 2012, the NRR petition manager, Mr. John Lamb, offered you an opportunity to address the NRC's Petition Review Board (PRB) during a public meeting, which you accepted.

Because the petition requested immediate action, the PRB met on November 26, 2012, to review the request. The PRB concluded that there was no immediate safety concern to Oyster Creek, or to the health and safety of the public as described further in the enclosure letter. The PRB's decision to deny your request for immediate action was communicated to you on November 26, 2012. 3 You addressed the PRB on January 3,2013, to discuss your petition. On April 3, 2013, the PRB met to make its initial recommendation on whether to accept or reject the petition for review using the criteria in IVID 8.11. In accordance with MD 8.11, Part III, C.2, "Criteria for Rejecting Petitions Under 10 CFR 2.206," the PRB made an initial recommendation that the issues raised in your petition, as supplemented, met the criteria for rejection because the issues raised have already been reviewed, evaluated, and resolved by the NRC, as described further in the enclosure to this letter. The PRB's initial recommendation was communicated to you on April 5,2013. 4 A second opportunity to further address the PRB was provided and accepted.

This meeting took place on April 18, 2013. 5 On June 17, 2013, the PRB met to discuss the supplemental information you provided. The PRB's final recommendation is that your petition does not meet the criteria for consideration under 10 CFR 2.206, because it raises issues for Oyster Creek that have already been reviewed, evaluated, and resolved by the NRC; therefore, the PRB has concluded that your petition meets the criteria for rejection in accordance with MD 8.11, Part III, C.2.

You provided comments regarding the 2.206 petition process and those comments have been provided to the 2.206 Coordinator in the Division of Policy and Rulemaking.

3 ADAMS Accession No. ML12331A345.

4 ADAMS Accession No. ML13098A200.

5 ADAMS Accession No. ML13127A253.

R. Webster -3 Enclosed are the detailed PRB's responses to the issues raised in your petition, as supplemented. Thank you for bringing these issues to the attention of the NRC.

Sincerely,

~4v-<-

Allen Howe, Deputy Dir?c?;

Division of Inspection and Regional Support Office of Nuclear Reactor Regulation Docket No: 50-219

Enclosure:

As stated cc: Licensee (w/copy of incoming 2.206 request)

Listserv

2.206 PETITION BY NEW JERSEY ENVIRONMENTAL FEDERATION (ET. AL.)

FOR OYSTER CREEK NUCLEAR GENERATING STATION EXELON GENERATION COMPANY, LLC DOCKET NO. 50-219 INTRODUCTION In the petition submitted November 19, 2012,1 Richard Webster, representing the New Jersey Environmental Federation, the Grandmothers, Mothers, and More for Energy Safety, and Beyond Nuclear, Inc. (collectively Petitioners) asked the U.S. Nuclear Regulatory Commission (NRC) to keep Oyster Creek Nuclear Generating Station (Oyster Creek) from restarting until the following conditions are met:

(1) The evacuation plan is updated to reflect the new reality post-Sandy including evacuation shelters, blocked roads, emergency responders farther away and more distracted, etc.; and the sirens are repaired; (2) The desjgn storm for flood defense purposes is updated to reflect the recent spate of storms and climate change and, additional flood protection is put in place as appropriate; (3) The "indications" (cracks or their precursors) are investigated ... and the public is assured through release of additional data ... and analysis ...

they pose no additional risk of a nuclear catastrophe; (4) Exelon reviews whether the indications were predicted by its modeling and whether it can predict that no problematic indications will develop before the next inspection cycle and proof of ability to predict fatigue. , .

accurately is released to the public; and (5) To ensure transparency, a public meeting with NRC is held at which staff can satisfactorily answer the public's concerns, including those above.

On November 30, 2012,2 the Petitioners provided a supplement to the petition and requested that the public Petition Review Board (PRB) meeting be held close to Oyster Creek, The following is a summary of the issues the Petitioners are concerned about:

  • That Sandy illustrates that beyond design-basis storms are now more probable than NRC has been assuming since 1969, when the plant was first licensed, 1 Agencywide Documents Access and Management System (ADAMS) Accession No. M L 12326A361.

2 ADAMS Accession No. ML12338A246.

Enclosure

-2

  • The root cause of the leak on the reactor spray system and the implications on the license renewal AMP.

The NRC communicated to the Petitioners on November 30,2012, and December 6,2012, regarding arrangements for a public meeting. The NRC informed the Petitioners that the public meeting would be held at the NRC Headquarters in Rockville, Maryland. The NRC also informed the Petitioners that the purpose of the public meeting was to give them an opportunity to provide any additional explanation or support for the petition before the PRB's initial consideration and recommendation. The NRC also indicated that the meeting was not a hearing, nor was it an opportunity for the Petitioners to question or examine the PRB on the merits or the issues presented in the petition request. No decisions regarding the merits of the petition were made at the meeting.

On January 3,2013,3 the Petitioners addressed the PRB in a public meeting held in the Commissioners' Hearing Room in Rockville, Maryland. The public PRB meeting was scheduled from 11 :00 AM - 1:00 PM (Eastern Time). The public PRB meeting was recorded by the NRC Operations Center and was transcribed by a court reporter. The transcript became a supplement to the petition. The transcript was also made publicly available. There were telephone lines for members of the public to listen to the public PRB meeting. In addition, the public PRB meeting was webcasted through the NRC webpage. As the basis for this request, the Petitioners stated that they have serious concerns about the ongoing safety at Oyster Creek. The Petitioners believe that the NRC appears to be failing to enforce its regulations, and that lack of enforcement is leading to a lack of adequate protection at the power plant.

The Petitioners have three points and one procedural issue. The Petitioners' points are:

(1) Exelon [Exelon Generation Company, LLC or licensee] discovered unacceptable indications near the control rod drive return level on the reactor pressure vessel, and the Petitioners have some concerns about how this was dealt with; (2) During Hurricane Sandy, the Petitioners understand that the plant came within 6 inches of losing the service water pumps; and (3) The Petitioners believe Exelon failed to report a major loss of offsite emergency response capability in violation of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.72(b)(3)(viii).

The Petitioners' procedural issue is that they believe there is a major problem with transparency, and despite the Petitioners' repeated requests, the NRC has provided the Petitioners with no documents beyond a few emails, which provided cursory information.

3 ADAMS Accession No. ML13015A144.

-3 The Petitioners expressed the following concerns:

  • Water levels reached to 7.4 feet at the plant's water intake structure on the morning of October 30, 2012, and portends risks in future storms.
  • Because of power outages during the storm, 36 out of 43 warning sirens were inoperable so that an alert system in the surrounding community might have failed if it had been needed. Oyster Creek should have back-up power for sirens.
  • Also because of the power outages, the Petitioners have concerns about the capacity of the generators at the plant. What is their capacity to operate when power outages are long-lasting and if the cooling pumps were close to failure; and, if they did fail, are there other sources of cooling water for the generators?
  • Local residents have voiced concerns about electrical corrosion that might have been caused by the storm. Can the NRC verify if seawater reached any critical electrical infrastructure at the plant and whether there was corrosion?
  • Local residents have also raised concerns about the dry cask storage area. Was the dry cask storage of radioactive waste area compromised and could it be vulnerable to a future storm?
  • In light of dramatic changes to flood risks as evidenced by the Federal Emergency Management Agency (FEMA) new flood maps and damage from Sandy, the Petitioners asked that a revised flood management plan would be considered and an overall assessment made on how close we came to a disaster and whether projections indicate the site would be able to withstand damage from future hurricanes.
  • The Petitioners asked that the NRC request the release of Exelon data on the analysis of the cracks, precursors to cracks and pinhole leaks that were observed in the reactor nozzle and cooling system.

On April 18, 2013,4 the Petitioners addressed the PRB on a conference call. The conference call was recorded by the NRC Operations Center and was transcribed by a court reporter. The transcript became a supplement to the petition. The transcript was also made available to the public. The Petitioners expressed that: (1) there was not a degree of separation between the PRB and the NRC staff; (2) Oyster Creek is not meeting GDC-2 [General Design Criterion 2, "Design Bases for Protection Against Natural Phenomena"] due to Hurricane Sandy; and (3)

Oyster Creek did not meet reporting requirements during Hurricane Sandy.

BACKGROUND On November 23,2012, the petition manager contacted the Petitioners to discuss the 10 CFR 2.206 process and to offer the Petitioners an opportunity to address the PRB by phone 4 ADAMS Accession No. ML13127A253.

-4 or in person. The Petitioners requested to address the PRB prior to its internal meeting to make the initial recommendation to accept or reject the petition for review.

Because the petition requested immediate action, the PRB met internally on November 26, 2012, to review the request. The PRB denied the Petitioners request for immediate action on the basis that there was no immediate safety concern to Oyster Creek or to the health and safety of the public for the following reasons:

(1) On November 13, 2012,5 the FEMA concluded that offsite radiological emergency preparedness is adequate to provide "Reasonable Assurance," and that appropriate measures can be taken to protect the health and safety of the public, in the event of a radiological emergency at Oyster Creek in Ocean County, New Jersey.

(2) At the time, there were 3 emergency notification sirens inoperable out of a total of 42 emergency notification sirens, which does not exceed Exelon's reporting threshold of 25 percent or more sirens out of service. At the time, Exelon was working to restore the 3 inoperable sirens. FEMA's assessment determined that, in the areas where the sirens were determined to be inoperable, the FEMA-approved backup notification method of route alerting could be conducted, if needed.

(3) Hurricane Sandy did not exceed Oyster Creek's maximum flood level due to probable maximum hurricane (PMH). As reported in the Oyster Creek Final Safety Analysis Report (FSAR), Subsection 2.4.5, the maximum flood level due to PMH will be at elevation 22 feet (ft) mean sea level (MSL). The plant grade, elevation 23 ft MSL, is one foot above the PMH flood level. Therefore, the flood will not find its way into the plant buildings. The floor levels are generally 6 inches above grade at elevation 23 ft and 6 inches. The circulating water intake structure, with its deck at elevation 6 ft, will be under water. This deck supports, apart from the other equipment, the circulating water pumps and the emergency service water pumps. During a PMH flood, the circulating water and service water pumps will become inoperable. As such, emergency plant procedures have been instituted that require the plant to be shutdown when flood waters reach a pre-determined level, ensuring the capability for safe shutdown under normal or abnormal conditions.

(4) During a planned, routine inspection program, Exelon discovered control rod drive return nozzle safe end to pipe weld indications. These indications were determined to be surface in nature and did not result in any leakage. Exelon completed a structural weld overlay in accordance with the American Society of Mechanical Engineers (ASME)

Code.

The Petitioners were informed on November 26, 2012,6 via email of the PRB's decision to deny the Petitioners' request for immediate action to keep Oyster Creek to restarting after its refueling outage.

On November 28, 2012,7 the Petitioners requested to have a public meeting to address the PRB.

5 ADAMS Accession No. ML12319A627.

6 ADAMS Accession No. ML12331A345.

-5 On November 30, 2012,8 the Petitioners requested information related to the reactor spray flange leak.

The NRC communicated with the Petitioners on November 30,2012,9 and December 6,2012,10 regarding arrangements for the public PRB meeting. The NRC informed the Petitioners that the public meeting would be held at the NRC Headquarters in Rockville, Maryland. The NRC also informed the Petitioners that the purpose of the public PRB meeting was to give the Petitioners an opportunity to provide any additional explanation or support for the petition before the PRB's initial consideration and recommendation. The public PRB meeting was not a hearing, nor was it an opportunity for the Petitioners to question or examine the PRB on the merits or the issues presented in the petition request. The NRC informed the Petitioners that no decisions regarding the merits of the petition will be made at the public PRB meeting.

On December 12, 2012,11 the NRC issued a public meeting notice for this meeting and placed it on the NRC public webpage.

On December 31, 2012,12 the Petitioners made a request for the NRC to provide all the documents that the NRC staff reviewed in its decision-making.

On January 2,2013,13 the NRC informed the Petitioners that the public meeting would be held at the NRC Headquarters in Rockville, Maryland. The NRC also outlined information on the purpose and format of the public PRB meeting as had been done in the November 30, and December 6, 2012, communications.

On January 3, 2013, 14 the Petitioners addressed the PRB to discuss the petition.

On January 10, 2013, 15 the NRC issued the Special Inspection Team (SIT) report regarding the emergency preparedness program performance and organizational decision-making associated with Oyster Creek's response to Hurricane Sandy on October 29 and 30, 2012.

On January 11, 2013,16 the NRC informed the Petitioners that the NRC SIT report was issued and available to the public.

On January 15, 2013,17 the NRC informed the Petitioners that the transcript of the public PRB meeting, held on January 3,2013, was available to the public.

7 ADAMS Accession No. ML12338A234.

8 ADAMS Accession No. ML12338A240.

9 ADAMS Accession No. ML12338A234.

10 ADAMS Accession No. ML12341A299.

11 ADAMS Accession No. ML12340A493.

12 ADAMS Accession No. ML13002A150.

13 ADAMS Accession No. ML13002A159.

14 ADAMS Accession No. ML13007A084.

15 ADAMS Accession No. ML13010A470.

16 ADAIVIS Accession No. ML13015A626.

17 ADAMS Accession No. ML13015A635.

-6 On January 15, 2013,18 the Petitioners acknowledged reading the SIT report, but the Petitioners had a question regarding service water cooling to the Oyster Creek emergency diesel generators (EDGs).

On January 15, 2013,19 the NRC responded to the Petitioners' questions regarding service water cooling to the Oyster Creek EDGs.

On April 3, 2013, the PRB met and made an initial recommendation.

On April 5, 2013,20 the NRC informed the Petitioners of the PRB's initial recommendation.

On April 11, 2013,21 the NRC responded to questions from the Petitioners and offered the Petitioners a public meeting or a conference call to further address the PRB. The Petitioners elected to present supplemental information to the PRB via a conference call.

On April 18, 2013,22the Petitioners addressed the PRB via a conference call that was transcribed by a court reporter, made available to the public, and became part of the Petition.

On June 17, 2013, the PRB held an internal meeting to discuss the supplemental information provided on April 18, 2013, and to make a final recommendation.

RESPONSES Sirens Oyster Creek has 42 emergency notification sirens. NRC Event Report 48450 incorrectly stated that there are 43 emergency notification sirens and that 36 sirens out of 43 were out of service.

At the height of the storm, 39 sirens were out of service. Event Report 48495 stated that 11 emergency notification sirens were inoperable out of a total of 42 emergency notification sirens, which exceeded Exelon's reporting threshold of 25 percent or more sirens out of service.

Therefore, Exelon made an 8-hour report, as required under 10 CFR 50. 72(b )(3)(xiii) due to the "Loss of Emergency Preparedness Capabilities." Currently, all emergency notification sirens are operable.

FEMA's assessment determined that, in the areas where the sirens were determined to be inoperable, the FEMA-approved backup notification method of route alerting could be conducted, if needed. With regard to back-up power for the sirens, Exelon has installed 42 new sirens with battery back-up at Oyster Creek, and Exelon is working with the State of New Jersey to get FEMA to accept the new sirens with battery backup capability. Following acceptance by FEMA, the sirens will be placed in service and the old sirens will be removed; this expected by the end of December 2013.

The Petitioners requested that the NRC review whether Exelon had an obligation pursuant to 10 CFR 50.72(b)(3)(viii) to include in its event reports information regarding degraded emergency response that went beyond reporting of the siren failures. 10 CFR 50.72(b)(3)(xiii) 18 ADAMS Accession No. ML13015A626.

19 ADAMS Accession No. ML13015A676.

20 ADAMS Accession No. ML13098A200.

21 ADAMS Accession No. ML13105A431.

22 ADAMS Accession No. ML13127A253.

-7 states the following: "[a]ny event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of control room indication, Emergency Notification System, or offsite notification system)." In the SIT Report, the NRC inspectors interviewed personnel, reviewed various procedures, logs, critiques and corrective action program documents to assess whether equipment, human performance and programmatic issues related to emergency action level event declarations, the activation of Oyster Creek's emergency response organization and Oyster Creek's preparedness for the hurricane were appropriately identified and entered into the corrective action program. No findings were identified. Also, Exelon had no obligation pursuant to 10 CFR 50. 72(b )(3)(xiii) to include in its event reports information regarding degraded emergency response that went beyond reporting siren failures. In addition, FEMA and the State of New Jersey have jurisdiction, not the NRC, in evacuation capability, and determined there was no degradation of emergency responses and/or evacuations.

This issue was addressed in the following documents:

  • an email dated November 13,2012 (see footnote 5);
  • SIT report dated January 10, 2013 (see footnote 15);
  • Quarterly Inspection Report dated January 31,2013;23 and
  • letter dated February 22,2013. 24 Emergency Preparedness On November 13, 2012, FEMA concluded that offsite radiological emergency preparedness is adequate to provide "Reasonable Assurance," and that appropriate measures can be taken to protect the health and safety of the public, in the event of a radiological emergency at Oyster Creek in Ocean County, New Jersey.

The New Jersey Office of Emergency Management personnel have personally inspected all emergency response-related facilities within, and support the 10-mile Emergency Planning Zone (EPZ). FEMA Region II accompanied some of the inspections to verify that the emergency response facilities and infrastructure are intact and/or have been returned to service. FEMA is continuing to work with the State of New Jersey and the EPZ county to ensure that they are able to maintain reasonable assurance and institute any necessary compensatory measures, as they also deal with the needs of real world disaster response (44 CFR 350.13) in the aftermath of Hurricane Sandy and the subsequent Nor'easter.

The NRC staff held several discussions with the State of New Jersey and FEMA regarding offsite radiological emergency preparedness. Based on the discussions and the NRC staff observations during Hurricane Sandy and during the aftermath, the FEMA and the State of New Jersey conclusions that offsite radiological emergency preparedness is adequate.

23 ADAMS Accession No. ML13031A540.

24 ADAMS Accession No. ML13035A261.

- 8 This issue was addressed in the following documents:

  • an email dated November 13,2012 (see footnote 5);
  • SIT report dated January 10,2013 (see footnote 15);
  • Quarterly Inspection Report dated January 31, 2013 (see footnote 23); and
  • letter dated February 22, 2013 (see footnote 24).

Flooding Oyster Creek remained within its licensing basis during Hurricane Sandy. Hurricane Sandy did not exceed Oyster Creek's maximum flood level due to PMH. As reported in the Oyster Creek FSAR, Subsection 2.4.5, the maximum flood level due to PMH will be at elevation 22 ft MSL.

The plant grade, elevation 23 ft MSL, is one foot above the PMH flood level. Therefore, the flood will not find its way into the plant buildings. The floor levels are generally 6 inches above grade at elevation 23 ft and 6 inches. The circulating water intake structure, with its deck at elevation 6 ft, will be under water. This deck supports, apart from the other equipment, the circulating water pumps and the emergency service water pumps. During a PMH flood, the circulating water and service water pumps will become inoperable. As such, emergency plant procedures have been instituted that require the plant to be shutdown when flood waters reach a pre-determined level, ensuring the capability for safe shutdown under normal or abnormal conditions.

The NRC updated part of its March 12,2012, request for information from all U.S. nuclear power plants, setting out a schedule for completing flooding hazard re-evaluations recommended by the NRC's Near-Term Task Force, which examined lessons learned from the Fukushima Dai-ichi nuclear accident.

From the NRC Press Release No.12-055, "NRC Prioritizes Industry Responses to Request for Post-Fukushima Flood Hazard Evaluations," dated May 11,2012:

"The information in front of us today shows U.S. plants are capable of safely handling the most likely floods at their sites. These re-evaluations will help us better understand the very unlikely flooding that could occur in the future," said Eric Leeds, director of the NRC's Office of Nuclear Reactor Regulation. "We've publicly discussed the prioritization process several times since we issued the information request. and this schedule provides a solid path towards getting the work done correctly and efficiently."

The prioritization schedule, outlined in a letter to every plant owner. gives plants 1, 2, or 3 years to complete the hazard evaluations. Oyster Creek has until March 12, 2015, to complete the flooding re-evaluation.

The design-basis flood height at Oyster Creek is 22 ft. On page 5 of the NRC SIT Report, dated January 10, 2013, it states the following:

At approximately 12:18 a.m. on October 30,2012, the maximum intake level of 7.4 feet was reached as determined by water level measurements above the base of the service water pumps. Water levels remained below the service water pump motors and well below the design basis flood height of greater than 22 feet

-9 that is documented in UFSAR [Updated Final Safety Analysis Report] section 2.4.5.4.

The EDGs at Oyster Creek are not dependent on service water for cooling. The EDGs use a fan/radiator assembly for cooling, exactly like a car does. At Oyster Creek, if the service water pumps are unavailable, this has no effect on the EDGs ability to fulfill its design function. On October 29,2012, offsite power to Oyster Creek was lost at 8:18 PM, and operators entered procedure ABN-36, "Loss of Offsite Power." EDGs automatically started on the loss of offsite power. The EDGs were automatically aligned to restore power to the emergency busses.

Oyster Creek has two EDGs. The EDGs are independent of each other, with the exception of a common bulk fuel storage supply, and are provided with auxiliary systems to ensure reliable starting and continuous operation with no operator attention. Power to start the units is self contained and is not dependent on the availability of any other source of normal plant power at the moment of starting. The two EDGs are located in the Diesel Generator Building, which is a separate reinforced concrete structure, and it is located at the 23 ft elevation. Each unit and its auxiliaries is located in a separate room within the Diesel Generator Building. A 15,150 gallon Diesel Generator Fuel Storage Tank was sized to provide 3 days of fuel supply. The tank is maintained above a level corresponding to a capacity of 14,000 gallons by manually transferring fuel from a 75,000 gallon fuel oil tank, located directly east of the boiler house located at the 23 ft elevation.

The water levels reached 7.4 ft at the plant's water intake structure, so some electrical cabling was flooded. Exelon performed an inspection and surveillance tests to ensure operability of the electrical components. No safety-related electrical infrastructure was wetted. Motors were above the flood level. Cabling is enclosed in conduits. In addition to being enclosed in conduit, 4 safety-related power cables have been replaced with Okonite cables that are rated for submergence. This is a project that Exelon has been working over the past couple of years and is not related to the effects of Sandy. Cables used at Oyster Creek are not like Romex wiring used in homes. Oyster Creek cables are tested periodically, meggared and thermography is performed looking for hot spots which would indicate increased resistance due to corrosion.

Exelon cleaned and meggared a motor control center that has controls/breakers for low pressure and high pressure screen wash pumps and the traveling screens.

The NRC had a hydrologist. independent of the PRB, review the flooding that occurred at Oyster Creek during Hurricane Sandy to determine if the plant continued to meet its design and licensing basis. The hydrologist report25 concluded that Hurricane Sandy never exceeded the design-basis flood parameters for Oyster Creek. The PMH parameters used in the calculation of the 23 ft storm surge is conservative, based on the water level observed during Hurricane Sandy and storm surge studies conducted in 2000 using the Empirical Simulation Technique.

The post-Fukushima safety reviews of the current operating nuclear power plants is addressing the site flooding characteristics using the state-of-the-art methodology, as well as emergency procedures.

25 ADAMS Accession No. ML13127A239,

- 10 GDC-2, "Design Bases for Protection Against Natural Phenomena," states:

Structures, systems, and components important to safety shall be designed to withstand the effects of natural phenomena such as earthquakes, tornadoes, hurricanes, floods, tsunami, and seiches without loss of capability to perform their safety functions, The design bases for these structures, systems, and components shall reflect: (1) Appropriate consideration of the most severe of the natural phenomena that have been historically reported for the site and surrounding area, with sufficient margin for the limited accuracy, quantity, and period of time in which the historical data have been accumulated, (2) appropriate combinations of the effects of normal and accident conditions with the effects of the natural phenomena and (3) the importance of the safety functions to be performed.

In the SIT Report, it states: "At approximately 12:18 a,m. on October 30,2012, the maximum intake level of 7,4 ft was reached as determined by water level measurements above the base of the service water pumps. Water levels remained below the service water pump motors and well below the design basis flood height of greater than 22 ft that is documented in UFSAR section 2,4.5,4,"

The Petitioners questioned how decay heat would be removed if the circulating water pumps are not working during a flood event The Isolation Condenser System provides a backup heat sink for reactor heat when the main condenser is unavailable, The system provides a natural circulation heat transfer path for the reactor coolant system, with heat transferred to the environment by boiling secondary-side water in the isolation condensers and venting steam directly to atmosphere, This issue was addressed in the following documents:

  • SIT report dated January 10, 2013 (see footnote 15);
  • Quarterly Inspection Report dated January 31, 2013 (see footnote 23); and
  • letter dated February 22,2013 (see footnote 24).

Dry Cask Storage The base of the dry cask storage is located at 23 ft elevation and the water levels reached 7,4 ft during Hurricane Sandy. Therefore, the dry cask storage was never compromised at any point during Hurricane Sandy, This issue was addressed in the following documents:

  • Quarterly Inspection Report dated January 31, 2013 (see footnote 23); and
  • letter dated February 22, 2013 (see footnote 24).

Event Reports 48491 and 48537 On November 7,2012, during a planned, routine inspection program, General Electric notified the Oyster Creek management of surface indications that were detected by dye penetrant testing. The indications were in the adjacent base material area of the system pressure boundary weld. The indications were located top dead center of the 3 inch pipe,

- 11 Indication No.1 was upstream 0.7 inches away from the weld toe; the indication is 1.5 inches long. Indication No.2 was downstream 0.2 inches away from the weld toe; the indication is 2.5 inches long. The indications were determined to be surface in nature and did not result in any leakage. Exelon completed a structural weld overlay in accordance with the ASME Code. On January 7,2013,26 Exelon submitted a Licensee Event Report (LER) 2012-003-00, "Indications Identified in the Control Rod Drive Return Nozzle (N9)." Exelon stated that U[t]he most probable cause of the surface indications was determined to be outside diameter stress corrosion cracking." Exelon concluded that the N9 nozzle weld overlay can safely operate for one operating cycle of 24 months and subsequent analysis will be performed to support safe operation for continued operating cycles.

On November 26,2012, the licensee discovered a pinhole leak on a Reactor Head Spray line flange during the Nuclear Steam Supply System Leak Test. Water was found to be weeping from the pinhole leak (approximately 2 to 3 drops per minute). The licensee performed an ASME code repair. The licensee also revised the Oyster Creek Reactor Pressure Vessel Disassembly procedure to improve guidance and appropriate cautions for the Reactor Head Cooling (RHC) flange. On January 25, 2013, Exelon submitted LER 2012-005-00, "Flange Leakage Found During NSSS [Nuclear Steam Supply System] Leak Test." Exelon stated, U[t]he most probable cause of the leak is due to the flange weld-base metal being subject to additional mechanical and thermal stress of the design of the flange." The licensee states that mechanical and thermal stresses outside of the design of the flange, initiated by a 2008 event, were likely to have resulted in the pinhole leakage. LER 2012-005-00 states:

In 2008, during reactor disassembly (mirror insulation removal), an incorrect flange was disconnected from the reactor head instead of the 2 inch RHC flange, which should have been disconnected. Due to the RHC flange still being connected, the flange was stressed and the RHC piping was bent when an attempt was made to remove the RHC piping and mirror insulation from the reactor head using the overhead crane. There was no indication of damage to the RHC flange at the time of this event. A large portion of the piping up to the N-7B nozzle was replaced. Based on finding no indication of damage, the RHC flange was not replaced .... It is highly likely that the additional mechanical stress introduced an undetectable indication. Thermal cycling resulted in the base metal microstructure expanding and contracting, promoting propagation and growth of the metal indications. Based on the source of the leakage being identified as through-wall indication in the base metal, the most probable cause of the flange leakage was due to an undetectable indication initiated in 2008, which propagated over time into a through-wall leak by thermal cycling and additional mechanical stresses.

The objective of the NRC Inspection Manual Inspection Procedure IP-71003, "Post-Approval Site Inspection for License Renewal," is to verify the license conditions added as part of the renewed operating license, regulatory commitments, selected AMPs, and time limited aging analyses are implemented and/or completed in accordance with 10 CFR Part 54, "Requirements for the Renewal of Operating Licenses for Nuclear Power Plants."

The NRC staff has not found a problem with the licensee's AMP.

26 ADAMS Accession No. ML13025A082.

- 12 The NRC staff performed inspections and reviewed both ASME code repair packages.

The NRC provides ongoing oversight of the safety of Oyster Creek. One of the programs the NRC employs to provide that oversight is the Reactor Oversight Process (ROP). The ROP uses a variety of tools and inspection techniques to monitor and evaluate the licensee performance.

The process focuses on those plant activities that are most important to safety. The NRC Inspectors onsite at Oyster Creek look at thousands of pages of documents in the course of their duties. NRC Inspectors review procedures, emergency response organization records, issue reports, corrective action packages, work packages, surveillance testing, control room operators' narrative logs, interview station personnel, and various technical documents. The documents related to: (1) the control rod drive return nozzle safe end to pipe weld indications; and (2) the reactor head spray line flange, have not been submitted to the NRC. As such, the documents are not in the NRC possession, but they are available for inspection. The NRC Inspectors have reviewed the documents. The State of New Jersey Department of Environmental Protection personnel have access to Oyster Creek and can review Exelon's documents.

This issue was addressed in the following documents:

  • SIT report dated January 10, 2013 (see footnote 15);
  • Quarterly Inspection Report dated January 31, 2013 (see footnote 23); and
  • letter dated February 22, 2013 (see footnote 24).

Internal PRB Meeting During the public meeting, held on January 3, 2013, the Petitioners requested that the NRC staff make the staff presentation to the PRB a public meeting. The Petitioners were informed at the meeting held on January 3, 2013, that the staff presentation to the PRB is an internal meeting.

The PRB decided that the staff presentation would remain, consistent with Management Directive 8.11, an internal meeting.

ML13128A221

  • via email OFFICE NRRlDORLJLPL1-2IPM NRRlDORLJLPL1-21l.A NRRlDPRlPGCB NRRlDORLJLPL1-2/BC(A) DIRS/DD JLamb ABaxter* w/comments TMensah* VRodriguez AHowe 06/19/2013 06119/2013 06/1812013 06/2412013 06/26/2013