ML13266A233: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(11 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13266A233
| number = ML13266A233
| issue date = 12/18/2013
| issue date = 12/18/2013
| title = Fermi Nuclear Plant, Unit No. 2 - Request for Withholding Information from Public Disclosure Regarding License Amendment Request to Relocate Pressure and Temperature Limits Report
| title = Request for Withholding Information from Public Disclosure Regarding License Amendment Request to Relocate Pressure and Temperature Limits Report
| author name = Wengert T J
| author name = Wengert T
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
| addressee name = Plona J M
| addressee name = Plona J
| addressee affiliation = DTE Electric Company
| addressee affiliation = DTE Electric Company
| docket = 05000341
| docket = 05000341
| license number = NPF-043
| license number = NPF-043
| contact person = Chawla M L
| contact person = Chawla M
| case reference number = TAC MF0446
| case reference number = TAC MF0446
| document type = Letter, Proprietary Information Review
| document type = Letter, Proprietary Information Review
| page count = 5
| page count = 5
| project = TAC:MF0446
| stage = Withholding Request Acceptance
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055~-0001 December 18, 2013 Mr. Joseph M. Plena Senior Vice President and Chief Nuclear Officer DTE Electric Company Fermi 2 -210 NOC 6400 North Dixie Highway Newport, Ml 48166
==SUBJECT:==
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR FERMI 2 (T AC NO. MF0446)
==Dear Mr. Plena:==
I By letter to the U.S. Nuclear Regulatory Commission (NRC) dated December 21, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13004A134), supplemented by letters dated July 9, 2013 (ADAMS Accession No. ML13191A748), and October 17,2013 (ADAMS Accession No. ML13291A363), DTE Electric Company (DTE, or the licensee) submitted a license amendment request to amend the Fermi 2 Plant Operating License, Technical Specification Section 1.1, "Definitions", Section 3.4.1 0, "RCS Pressure and Temperature (P!T) Limits," and Section 5.6, "Reporting Requirements," by replacing the existing reactor vessel heatup and cooldown rate limits and the P!T limit curves with references to the Pressure and Temperature Limits Report at Fermi 2.
The proposed amendment also adopts the NRC approved methodology of the General Electric Hitachi (GEH) Nuclear Energy Licensing Topical Report NEDC-33178P-A, Revision 1, "General Electric Methodology for Development of Reactor Pressure Vessel Pressure-Temperature Curves," for the preparation of the Fermi 2 P!T limit curves.
December 21, 2012, submittal:
In a letter dated December 21,2012 (ADAMS Accession No. ML13004A134), DTE submitted as , two affidavits requesting that information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR) Part 2, Section 2.390:
Proposed License Amendment to Revise and Relocate Pressure Temperature Curves to a Pressure Temperature Limits Report, Contained in Enclosure 1 of GE-Hitachi Nuclear Energy Americas LLC (GEH) letter, 1-2RXPKK-13, "GEH Response to GGNS PT Curve RAis," dated October 19, 2012.
J. Plena                                                1) Electric Power Research Institute. Inc (EPRI)
EPRI affidavit dated October 4, 2012, which was replaced in a July 9, 2013, submittal by an affidavit executed on May 13, 2013, as Enclosure 9 (ADAMS Accession No. ML13191A748), by Neil Wilmshurst, the Vice President and Chief Nuclear Officer at EPRI. The May 13, 2013, affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
: c. The information sought to be withheld is considered to be proprietary for the following reasons. EPRI made a substantial economic investment to develop the Proprietary Information and, by prqhibiting public disclosure, EPRI derives an economic benefit in the form of licensing royalties and other additional fees from the confidential nature of the Proprietary Information. If the Proprietary information were publicly available to consultants and/or other businesses providing services in the electric and/or nuclear power industry, they would be able to use the Proprietary Information for their own commercial benefit and profit and without expending the substantial economic resources required of EPRI to develop the Proprietary Information.
: 2) GE-Hitachi Nuclear Energy Americas LLC (GEH)
GEH affidavit dated October 19, 2012 (resubmitted as Enclosure 4 to supplemental letter dated October 17, 2013), executed by Edward D. Schrull, Vice President, Regulatory Affairs Services Licensing, GEH. This affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companie~.
(4)b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
The nonproprietary version of 1-2RXPKK-13, GEH Responses to GGNS PT Curve RAis, is
. included as Enclosure 7 of the December 21, 2012, submittal.
July 9, 2013 submittal:
In a letter dated July 9, 2013, DTE submitted an affidavit as Enclosure 4 (ADAMS Accession No. ML f3191A748), requesting that information contained in the following document be withheld from public disclosure pursuant to 10 CFR 2.390:
J. Plona                                              1) Affidavit submitted by EPRI for the following document:
        "DTE Energy/Enrico Fermi Power Plant 2 Pressure and Temperature Limits Report Up to 24 and 32 Effective Full-Power Years" Contained in GE Hitachi Nuclear Energy Americas, NEDC-33785P, Revision 1, DRF Section 0000-0153-5712 R1, dated June 2013 DTE submitted an affidavit dated June 19, 2013, executed by Kurt Edsinger, Director of PWR and BWR Materials at EPRI, requesting that the information submitted for the above document be considered exempt from mandatory public disclosure for the following reasons:
: c. The information sought to be withheld is considered to be proprietary for the following reasons. EPRI made a substantial economic investment to develop the Proprietary Information and, by prohibiting public disclosure, EPRI derives an economic benefit in the form of licensing royalties and other additional fees from the confidential nature of the Proprietary Information. If the Proprietary Information were publicly available to consultants and/or other businesses providing services in the electric and/or nuclear power industry, they would be able to use the Proprietary Information for their own commercial benefit and profit and without expending the substantial economic resources required of EPRI to develop the Proprietary Information.
The non-proprietary version of NEDC-33785P, Revision 1, DRF Section 0000-0153-5712 R1, dated June 2013, is included as Enclosure 5 of the July 9, 2013, submittal.
: 2) Affidavit submitted by GEH for the following do.cument:
Enclosure 1 of GEH letter, 317855-3, "GEH Revised Response to GGNS PT Curve RAI 8," dated June 17, 2013 (ADAMS Accession No. ML13191A746), (Enclosure 6).
GEH submitted an affidavit dated June 17, 2013, (Enclosure 7 of July 9, 2013, letter) executed by Linda C. Dolan, Manager, Regulatory Compliance, requesting that the information submitted for the above document be considered exempt from mandatory public disclosure for the following reasons:
(4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies.
(4)b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
The non-proprietary version of Enclosure 1, "GEH Revised Response to GGNS PT Curve RAI 8," is included as Enclosure 8 (ADAMS Accession No. ML13191A748) dated July 9, 2013.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavits, have determined that the
J. Plona                                        submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the documents identified above marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
* Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area.* We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-4037.
Sincerely,
                                                  ~""~~
Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-341 cc: See next page Additional Distribution via Listserv
Edward D. Schrull, PE                  . Linda C. Dolan Vice President, Regulatory Affairs      Manager, Regulatory Compliance GE-Hitachi Nuclear Energy Americas LLC  GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Rd.
* 3901 Castle Hayne Rd.
Wilmington, NC 28401                    Wilmington, NC. 28401 Neil Wilmshurst, Vice President and      Kurt Edsinger, Director Chief Nuclear Officer                    PWR & BWR Materials Electric Power Research Institute        Electric Power Research Institute 1300 West W.T. Harris Boulevard          3420 Hillview Avenue Charlotte, NC 28262                      Palo Alto, CA 94304
..* ML13266A233 OFFICE      NRR/LPL3-1/PM        NRR/LPL3-1/PM            NRR/LPL3-1/LA        NRR/SRXB/BC NAME        MChawla              TWenQert                MHenderson            CJackson DATE        12/04/13            12/16/13                12/16/13              12/05/13 OFFICE      NRR/DE/EVIB/BC      NRR/LPL3-1/BC            NRR/LPL3-1/PM NAME        SRosenberg          RCa rison                TWengert DATE        10/07/13            12/18/13                12/18/13}}

Latest revision as of 01:36, 6 February 2020

Request for Withholding Information from Public Disclosure Regarding License Amendment Request to Relocate Pressure and Temperature Limits Report
ML13266A233
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/18/2013
From: Thomas Wengert
Plant Licensing Branch III
To: Plona J
DTE Electric Company
Chawla M
References
TAC MF0446
Download: ML13266A233 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055~-0001 December 18, 2013 Mr. Joseph M. Plena Senior Vice President and Chief Nuclear Officer DTE Electric Company Fermi 2 -210 NOC 6400 North Dixie Highway Newport, Ml 48166

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR FERMI 2 (T AC NO. MF0446)

Dear Mr. Plena:

I By letter to the U.S. Nuclear Regulatory Commission (NRC) dated December 21, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13004A134), supplemented by letters dated July 9, 2013 (ADAMS Accession No. ML13191A748), and October 17,2013 (ADAMS Accession No. ML13291A363), DTE Electric Company (DTE, or the licensee) submitted a license amendment request to amend the Fermi 2 Plant Operating License, Technical Specification Section 1.1, "Definitions", Section 3.4.1 0, "RCS Pressure and Temperature (P!T) Limits," and Section 5.6, "Reporting Requirements," by replacing the existing reactor vessel heatup and cooldown rate limits and the P!T limit curves with references to the Pressure and Temperature Limits Report at Fermi 2.

The proposed amendment also adopts the NRC approved methodology of the General Electric Hitachi (GEH) Nuclear Energy Licensing Topical Report NEDC-33178P-A, Revision 1, "General Electric Methodology for Development of Reactor Pressure Vessel Pressure-Temperature Curves," for the preparation of the Fermi 2 P!T limit curves.

December 21, 2012, submittal:

In a letter dated December 21,2012 (ADAMS Accession No. ML13004A134), DTE submitted as , two affidavits requesting that information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR) Part 2, Section 2.390:

Proposed License Amendment to Revise and Relocate Pressure Temperature Curves to a Pressure Temperature Limits Report, Contained in Enclosure 1 of GE-Hitachi Nuclear Energy Americas LLC (GEH) letter, 1-2RXPKK-13, "GEH Response to GGNS PT Curve RAis," dated October 19, 2012.

J. Plena 1) Electric Power Research Institute. Inc (EPRI)

EPRI affidavit dated October 4, 2012, which was replaced in a July 9, 2013, submittal by an affidavit executed on May 13, 2013, as Enclosure 9 (ADAMS Accession No. ML13191A748), by Neil Wilmshurst, the Vice President and Chief Nuclear Officer at EPRI. The May 13, 2013, affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

c. The information sought to be withheld is considered to be proprietary for the following reasons. EPRI made a substantial economic investment to develop the Proprietary Information and, by prqhibiting public disclosure, EPRI derives an economic benefit in the form of licensing royalties and other additional fees from the confidential nature of the Proprietary Information. If the Proprietary information were publicly available to consultants and/or other businesses providing services in the electric and/or nuclear power industry, they would be able to use the Proprietary Information for their own commercial benefit and profit and without expending the substantial economic resources required of EPRI to develop the Proprietary Information.
2) GE-Hitachi Nuclear Energy Americas LLC (GEH)

GEH affidavit dated October 19, 2012 (resubmitted as Enclosure 4 to supplemental letter dated October 17, 2013), executed by Edward D. Schrull, Vice President, Regulatory Affairs Services Licensing, GEH. This affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

(4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companie~.

(4)b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

The nonproprietary version of 1-2RXPKK-13, GEH Responses to GGNS PT Curve RAis, is

. included as Enclosure 7 of the December 21, 2012, submittal.

July 9, 2013 submittal:

In a letter dated July 9, 2013, DTE submitted an affidavit as Enclosure 4 (ADAMS Accession No. ML f3191A748), requesting that information contained in the following document be withheld from public disclosure pursuant to 10 CFR 2.390:

J. Plona 1) Affidavit submitted by EPRI for the following document:

"DTE Energy/Enrico Fermi Power Plant 2 Pressure and Temperature Limits Report Up to 24 and 32 Effective Full-Power Years" Contained in GE Hitachi Nuclear Energy Americas, NEDC-33785P, Revision 1, DRF Section 0000-0153-5712 R1, dated June 2013 DTE submitted an affidavit dated June 19, 2013, executed by Kurt Edsinger, Director of PWR and BWR Materials at EPRI, requesting that the information submitted for the above document be considered exempt from mandatory public disclosure for the following reasons:

c. The information sought to be withheld is considered to be proprietary for the following reasons. EPRI made a substantial economic investment to develop the Proprietary Information and, by prohibiting public disclosure, EPRI derives an economic benefit in the form of licensing royalties and other additional fees from the confidential nature of the Proprietary Information. If the Proprietary Information were publicly available to consultants and/or other businesses providing services in the electric and/or nuclear power industry, they would be able to use the Proprietary Information for their own commercial benefit and profit and without expending the substantial economic resources required of EPRI to develop the Proprietary Information.

The non-proprietary version of NEDC-33785P, Revision 1, DRF Section 0000-0153-5712 R1, dated June 2013, is included as Enclosure 5 of the July 9, 2013, submittal.

2) Affidavit submitted by GEH for the following do.cument:

Enclosure 1 of GEH letter, 317855-3, "GEH Revised Response to GGNS PT Curve RAI 8," dated June 17, 2013 (ADAMS Accession No. ML13191A746), (Enclosure 6).

GEH submitted an affidavit dated June 17, 2013, (Enclosure 7 of July 9, 2013, letter) executed by Linda C. Dolan, Manager, Regulatory Compliance, requesting that the information submitted for the above document be considered exempt from mandatory public disclosure for the following reasons:

(4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies.

(4)b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

The non-proprietary version of Enclosure 1, "GEH Revised Response to GGNS PT Curve RAI 8," is included as Enclosure 8 (ADAMS Accession No. ML13191A748) dated July 9, 2013.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavits, have determined that the

J. Plona submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the documents identified above marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

  • Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area.* We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-4037.

Sincerely,

~""~~

Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-341 cc: See next page Additional Distribution via Listserv

Edward D. Schrull, PE . Linda C. Dolan Vice President, Regulatory Affairs Manager, Regulatory Compliance GE-Hitachi Nuclear Energy Americas LLC GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Rd.

  • 3901 Castle Hayne Rd.

Wilmington, NC 28401 Wilmington, NC. 28401 Neil Wilmshurst, Vice President and Kurt Edsinger, Director Chief Nuclear Officer PWR & BWR Materials Electric Power Research Institute Electric Power Research Institute 1300 West W.T. Harris Boulevard 3420 Hillview Avenue Charlotte, NC 28262 Palo Alto, CA 94304

..* ML13266A233 OFFICE NRR/LPL3-1/PM NRR/LPL3-1/PM NRR/LPL3-1/LA NRR/SRXB/BC NAME MChawla TWenQert MHenderson CJackson DATE 12/04/13 12/16/13 12/16/13 12/05/13 OFFICE NRR/DE/EVIB/BC NRR/LPL3-1/BC NRR/LPL3-1/PM NAME SRosenberg RCa rison TWengert DATE 10/07/13 12/18/13 12/18/13