| number = ML14022A041
| number = ML14022A041
| issue date = 01/21/2014
| issue date = 01/21/2014
| title = North Anna TI-182 Phase 2 RFI Final
| title = TI-182 Phase 2 RFI Final
| author name = Rivera-Ortiz J E
| author name = Rivera-Ortiz J
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II
| addressee name = Heacock D A
| addressee name = Heacock D
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| docket = 05000338, 05000339
| docket = 05000338, 05000339
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 21, 2014 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060
-1257 January 21, 2014 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060


==SUBJECT:==
==SUBJECT:==
NORTH ANNA POWER STATION
NORTH ANNA POWER STATION - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION
- NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION


==Dear Mr. Heacock:==
==Dear Mr. Heacock:==
On February 10
, 201 4, the Nuclear Regulatory Commission (NRC) will begin inspection activities for the North Anna Power Station, Unit s 1 , and 2, in accordance with Temporary Instruction (TI) 2515-182, "Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks
."  This inspection is scheduled to be performed from February 10
- 1 2, 201 4, and will address the inspection requirements for Phase 2 of this TI.
In order to minimize the impact to your on
-site resources , and to ensure a productive inspection, we have enclosed a list of documents needed for the preparation and implementation of this inspection. The documents that are requested for this inspection include all relevant documents that will allow the inspector(s) to adequately complete Phase 2 of this inspection
. We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be M r. Jay Lieberstein, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Robert Carrion at (404) 997
-45 22 or robert.carrion@nrc.gov. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice,"
a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide D. Heacock 2 Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/ adams.html (the Public Electronic Reading Room).
Sincerely,  RA  Joel Rivera
-Ortiz , (Acting) Chief Engineering Branch 3 Division of Reactor Safety Docket No s.:  50-338 and 50
-339 License No s.:  NPF-4 and NPF-7 


==Enclosure:==
On February 10, 2014, the Nuclear Regulatory Commission (NRC) will begin inspection activities for the North Anna Power Station, Units 1, and 2, in accordance with Temporary Instruction (TI) 2515-182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. This inspection is scheduled to be performed from February 10 - 12, 2014, and will address the inspection requirements for Phase 2 of this TI.
Temporary Instruction (TI 2515
In order to minimize the impact to your on-site resources, and to ensure a productive inspection, we have enclosed a list of documents needed for the preparation and implementation of this inspection. The documents that are requested for this inspection include all relevant documents that will allow the inspector(s) to adequately complete Phase 2 of this inspection.
-182)  Inspection Document Request TI-182 Phase II Questions c c:  Distribution via Listserv
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Jay Lieberstein, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Robert Carrion at (404) 997-4522 or robert.carrion@nrc.gov.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide


J. Shea 2 Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
D. Heacock                                2 Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/ adams.html (the Public Electronic Reading Room).
-rm/ adams.html (the Public Electronic Reading Room).
Sincerely, RA Joel Rivera-Ortiz, (Acting) Chief Engineering Branch 3 Division of Reactor Safety Docket Nos.: 50-338 and 50-339 License Nos.: NPF-4 and NPF-7
Sincerely, RA Joel Rivera
-Ortiz , (Acting) Chief Engineering Branch 3 Division of Reactor Safety Docket No s.: 50-338 and 50
-339 License N os.: NPF-4 and NPF-7


==Enclosure:==
==Enclosure:==


Temporary Instruction (TI 2515-182) Inspection Document Request TI-182 Phase II Questions
Temporary Instruction (TI 2515-182)
Inspection Document Request TI-182 Phase II Questions cc: Distribution via Listserv
 
__________          X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE            RII:DRS          RII:DRS          RII:DRS SIGNATURE          RA              RA NAME              R. Carrion      J. Rivera-Ortiz DATE              1/17/2014        1/21/2014 E-MAIL COPY?          YES    NO    YES      NO      YES    NO TEMPORARY INSTRUCTION 2515-182 INSPECTION DOCUMENT REQUEST Inspection Dates:                February 10 - 12, 2014 Inspection Procedures:          TI 2515-182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks Inspector:                      Robert Carrion, Senior Reactor Inspector Information Requested for the Preparation and Completion of the In-Office Inspection:
The following documents listed below are requested (electronic copy, if possible) by February 5, 2014, to facilitate the preparation for the on-site inspection week.
: 1. Contact information for plant staff responsible for the implementation of the underground piping and tanks program.
: 2. Copy of the documents governing the implementation of the sites underground piping and tanks program. For example, this includes administrative and implementing procedures for the program.
: 3. Please review the Attachment to this Enclosure, TI 2515-182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, Phase 2 Questions, and provide response to all the questions, as applicable.
: 4. Schedule for completion of the following NEI 09-14, Guideline for the Management of Underground Piping and Tank Integrity, Revision 3, attributes:
Buried Piping Procedures and Oversight Risk Ranking Inspection Plan Plan Implementation Asset Management Plan Underground Piping and Tanks Procedures and Oversight Prioritization Condition Assessment Plan Plan Implementation Asset Management Plan Information to be provided On-Site to the Inspector following the Entrance Meeting:
: 1. Copy or ready access to the program drawings showing the location of buried and underground piping and tanks within the scope of the program.
: 2. Copy or ready access to the industry standards and guidelines associated with the program.
Enclosure


cc: Distribution via Listserv
2
: 3. Self- or third-party assessments of the underground piping and tanks program (if any have been performed).
: 4. Response to additional information requested prior to the inspection based on the response to the TI 2515-182 questions in the Attachment.
: 5. For any of the NEI 09-14 (Revision 3) attributes identified below which have been completed prior to the NRCs onsite inspection, provide written records that demonstrate that the program attribute is complete.
Buried Piping
* Procedures and Oversight
* Risk Ranking
* Inspection Plan
* Plan Implementation
* Asset Management Plan Underground Piping and Tanks
* Procedures and Oversight
* Prioritization
* Condition Assessment Plan
* Plan Implementation
* Asset Management Plan Inspector Contact Information                Mailing Address Robert Carrion                                US NRC- Region II Sr. Reactor Inspector                        Attn: Robert Carrion 404-997-4522                                  245 Peachtree Center Avenue, Suite 1200 robert.carrion@nrc.gov                        Atlanta, GA 30303 Enclosure


X PUBLICLY AVAILABLE
TI 2515-182 Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks Phase 2 Questions Questions                                          Response Question Subpart Number Initiative Consistency 1     a        Has the licensee taken any deviations to either of Yes / No the initiatives?
  -PUBLICLY AVAILABLE X NON-SENSITIVE ADAMS: X YES  NUMBER:__________      X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS  SIGNATURE RA RA    NAME R. Carrion J. Rivera-Ortiz    DATE 1/17/201 4 1/21/201 4    E-MAIL COPY?
b        If so, what deviations have been taken and what is (are) the basis for these deviations?
YES  NO      YES NO      YES NO      OFFICIAL RECORD COPY DOCUMENT NAME:
2    a        Does the licensee have an onsite buried piping    Yes / No program manager (owner) and, potentially, a staff?
S:\DRS\ENG BRANCH 3
b        How many buried piping program owners have there been since January 1, 2010?
\INSPECTIONS
c        How many other site programs are assigned to the buried piping program owner?
\WORKING DOCUMENTS
3     a        Does the licensee have requirements to capture    Yes / No program performance, such as system health reports and performance indicators?
\TI182 REQUEST FOR INFORMATION LETTER\2014\NORTH ANNA TI
b        Are these requirements periodic or event driven?  Periodic /
-182 PHASE 2 RFI FINAL.DOCX
Event Driven /
None c        Are there examples where these requirements        Yes / No have been successfully used to upgrade piping systems or to avert piping or tank leaks?
4    a        Does the licensee have a program or procedure      Yes / No to confirm the as-built location of buried and underground piping and tanks at the plant?
b        Has the licensee used this program?                Yes / No c        Was the program effective in identifying the      Yes / No location of buried pipe?
Attachment


Enclosure TEMPORARY INSTRUCTION 2515
2 5  For a sample of buried pipe and underground          Yes / No piping and tanks (sample size at least 1 high and    Sample size 1 low risk/priority pipe or tank), did the risk      examined ranking and/or prioritization process utilized by    _____
-182 INSPECTION DOCUMENT REQUEST Inspection Dates:
the licensee produce results in accordance with the initiative guidelines, i.e., which emphasize the importance of components which have a high likelihood and consequence of failure and deemphasize the importance of components which have a low likelihood and consequence of failure?
February 10 - 1 2 , 201 4  Inspection Procedures
6 a As part of its risk ranking process did the          Yes / No licensee estimate/determine the total length of buried/ underground piping included in the initiatives?
: TI 2515-182, "Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks" Inspector:
b As part of its risk ranking process did the          Yes / No licensee estimate/determine the total length of high risk buried/underground piping included in the initiatives?
Robert Carrion
Preventive Actions / System Maintenance 1 a For uncoated steel piping, has the licensee          Yes / No / Not developed a technical basis for concluding that      Applicable (no structural (e.g. ASME Code minimum wall, if          uncoated applicable) and leaktight integrity of buried piping buried steel can be maintained?                                  pipe) b Is the technical basis provided as justification by  Yes / No the licensee consistent with the initiative (including its reference documents) or industry standards (e.g. NACE SP0169) 2 a For buried steel, copper, or aluminum piping or      Yes / No / Not tanks which are not cathodically protected, has      Applicable (no the licensee developed a technical basis for        buried steel, concluding that structural (e.g. ASME Code          copper, or minimum wall, if applicable) and leaktight          aluminum integrity of buried piping can be maintained?        piping which is not cathodically protected) b Is the technical basis provided as justification by  Yes / No the licensee consistent with the initiative (including its reference documents) or industry standards (e.g. NACE SP0169)
, Senior Reactor Inspector
Attachment


Information Requested for the Preparation and Completion of the In
3 3 a For licensees with cathodic protection systems,    Yes / No / Not does the licensee have procedures for the           Applicable (no maintenance, monitoring and surveys of this        cathodic equipment?                                          protection systems) b Are the licensee procedures consistent with the     Yes / No initiative (including its reference documents) or industry standards (e.g. NACE SP0169)?
-Office Inspection
c Is the cathodic protection system, including the   Yes / No evaluation of test data, being operated and maintained by personnel knowledgeable of, or trained in, such activities 4  Is there a program to ensure chase and vault        Yes / No / N/A areas which contain piping or tanks subject to the (No piping in underground piping and tanks initiative are        chases or monitored for, or protected against, accumulation  vaults) of leakage from these pipes or tanks?
:  The following documents listed below are requested (electronic copy
Inspection Activities / Corrective Actions 1 a Has the licensee prepared an inspection plan for    Yes / No its buried piping and underground piping and tanks?
, if possible) by February 5 , 201 4 , to facilitate the preparation for the on
b Does the plan specify dates and locations where    Yes / No inspections are planned?
-site inspection week
c Have inspections, for which the planned dates      Occurred as have passed, occurred as scheduled or have a        scheduled /
. 1. Contact information for plant staff responsible for the implementation of the underground piping and tanks program.
substantial number of inspections been deferred?    Deferred 2 a Has the licensee experienced leaks and/or          Leaks Yes / No significant degradation in safety related piping or Degradation piping carrying licensed material since January 1,  Yes / No 2009?
: 2. Copy of the documents governing the implementation of the site's undergrou nd piping and tanks program.
b If leakage or significant degradation did occur,    Yes / No did the licensee determine the cause of the leakage or degradation?
For example, this includes administrative and implementing procedures for the program.
Attachment
: 3. Please review the Attachment to this Enclosure, "TI 2515-182 , Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks , Phase 2 Questions ," and provide response to all the questions, as applicable
. 4. Schedule for completion of the following NEI 09
-14 , "Guideline for the Management of Underground Piping and Tank Integrity," Revision 3 , attributes:
Buried Piping Procedures and Oversight Risk Ranking Inspection Plan Plan Implementation Asset Management Plan Underground Piping and Tanks Procedures and Oversight Prioritization Condition Assessment Plan Plan Implementation Asset Management Plan Information t o b e provided On
-Site t o the Inspector following the Entrance Meeting
: 1. Copy or ready access to the program drawings showing the location of buried and underground piping and tanks within the scope of the program
. 2. Copy or ready access to the industry standards and guidelines associated with the program.
2  Enclosure 3. Self- or third-party assessments of the underground piping and tanks program (if any have been performed).
: 4. Response to additional information requested prior to the inspection based on the response to the TI 2515
-182 questions in the Attachment
. 5. For any of the NEI 09
-14 (Revision 3) attributes identified below which have been completed prior to the NRC's onsite inspection, provide written records that demonstrate that the program attribute is complete.
Buried Piping Procedures and Oversight Risk Ranking Inspection Plan Plan Implementation Asset Management Plan Underground Piping and Tanks Procedures and Oversight Prioritization Condition Assessment Plan Plan Implementation Asset Management Plan Inspector Contact Information Mailing Address Robert Carrion US NRC- Region II Sr. Reactor Inspector Attn:  Robert Carrion 404-997-45 22    245 Peachtree Center Avenue, Suite 1200 robert.carrion@nrc.gov  Atlanta, GA 30303


Attachment TI 2515-182 Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks Phase 2 Questions Questions Response Question Number Subpart        Initiative Consistency 1 a Has the licensee taken any deviations to either of the initiatives?
4 c Based on a review of a sample of root cause        Yes / No / N/A analyses for leaks from buried piping or           (no leaks) underground piping and tanks which are safety related or contain licensed material, did the licensee's corrective action taken as a result of the incident include addressing the cause of the degradation?
Yes / No  b If so, what deviations have been taken and what is (are) the basis for these deviations?
d Did the corrective action include an evaluation of Yes / No / N/A extent of condition of the piping or tanks and     (no leaks) possible expansion of scope of inspections?
2 a Does the licensee have an onsite buried piping program manager (owner) and, potentially, a staff? Yes / No  b How many buried piping program owners have there been since January 1, 2010?
(Preference should be given to high risk piping and significant leaks where more information is likely to be available).
c How many other site programs are assigned to the buried piping program owner?
3 a Based on a review of a sample of NDE activities     Yes / No which were either directly observed or for which records were reviewed, were the inspections conducted using a predetermined set of licensee/contractor procedures?
3 a Does the licensee have requirements to capture program performance, such as system health reports and performance indicators?
b Were these procedures sufficiently described and   Yes / No recorded such that the inspection could be reproduced at a later date?
Yes / No  b Are these requirements periodic or event driven?
c Were the procedures appropriate to detect the       Yes / No targeted degradation mechanism?
Periodic / Event Driven / None  c Are there examples where these requirements have been successfully used to upgrade piping systems or to avert piping or tank leaks?
d For quantitative inspections, were the procedures   Yes / No used adequate to collect quantitative information?
Yes / No 4 a Does the licensee have a program or procedure to confirm the as
4  Did the licensee disposition direct or indirect NDE Yes / No results in accordance with their procedural requirements?
-built location of buried and underground piping and tanks at the plant?
5  Based on a sample of piping segments, is there     Yes / No evidence that licensees are substantially meeting the pressure testing requirements of ASME Section XI IWA-5244?
Yes / No  b Has the licensee used this program?
Attachment}}
Yes / No  c Was the program effective in identifying the location of buried pipe?
Yes / No 2  Attachment 5  For a sample of buried pipe and underground piping and tanks (sample size at least 1 high and 1 low risk/priority pipe or tank), did the risk ranking and/or prioritization process utilized by the licensee produce results in accordance with the initiative guidelines, i.e., which emphasize the importance of components which have a high likelihood and consequence of failure and deemphasize the importance of components which have a low likelihood and consequence of failure? Yes / No    Sample size examined
_____ 6 a As part of its risk ranking process did the licensee estimate/determine the total length of buried/ underground piping included in the initiatives?
Yes / No  b As part of its risk ranking process did the licensee estimate/determine the total length of high risk buried/underground piping included in the initiatives?
Yes / No    Preventive Actions / System Maintenance 1 a For uncoated steel piping, has the licensee developed a technical basis for concluding that structural (e.g. ASME Code minimum wall, if applicable) and leaktight integrity of buried piping can be maintained?
Yes / No / Not Applicable (no uncoated buried steel pipe)  b Is the technical basis provided as justification by the licensee consistent with the initiative (including its reference documents) or industry standards (e.g. NACE SP0169)
Yes / No  2 a For buried steel, copper, or aluminum piping or tanks which are not cathodically protected, has the licensee developed a technical basis for concluding that structural (e.g. ASME Code minimum wall, if applicable) and leaktight integrity of buried piping can be maintained?
Yes / No / Not Applicable (no buried steel, copper, or aluminum piping which is not cathodically protected) b Is the technical basis provided as justification by the licensee consistent with the initiative (including its reference documents) or industry standards (e.g. NACE SP0169)
Yes / No 3  Attachment 3 a For licensees with cathodic protection systems, does the licensee have procedures for the maintenance, monitoring and surveys of this equipment?
Yes / No / Not Applicable (no cathodic protection systems)  b Are the licensee procedures consistent with the initiative (including its reference documents) or industry standards (e.g. NACE SP0169)?
Yes / No  c Is the cathodic protection system, including the evaluation of test data, being operated and maintained by personnel knowledgeable of, or trained in, such activities Yes / No 4  Is there a program to ensure chase and vault areas which contain piping or tanks subject to the underground piping and tanks initiative are monitored for, or protected against, accumulation of leakage from these pipes or tanks?
Yes / No / N/A (No piping in chases or vaults)    Inspection Activities / Corrective Actions 1 a Has the licensee prepared an inspection plan for its buried piping and underground piping and tanks?  Yes / No  b Does the plan specify dates and locations where inspections are planned?
Yes / No  c Have inspections, for which the planned dates have passed, occurred as scheduled or have a substantial number of inspections been deferred?
Occurred as scheduled / Deferred 2 a Has the licensee experienced leaks and/or significant degradation in safety related piping or piping carrying licensed material since January 1, 2009?  Leaks Yes / No    Degradation Yes / No  b If leakage or significant degradation did occur, did the licensee determine the cause of the leakage or degradation?
Yes / No 4  Attachment c Based on a review of a sample of root cause analyses for leaks from buried piping or underground piping and tanks which are safety related or contain licensed material, did the licensee's corrective action taken as a result of the incident include addressing the cause of the degradation?
Yes / No / N/A (no leaks) d Did the corrective action include an evaluation of extent of condition of the piping or tanks and possible expansion of scope of inspections?
(Preference should be given to high risk piping and "significant" leaks where more information is likely to be available).
Yes / No / N/A (no leaks) 3 a Based on a review of a sample of NDE activities which were either directly observed or for which records were reviewed, were the inspections conducted using a predetermined set of licensee/contractor procedures?
Yes / No  b Were these procedures sufficiently described and recorded such that the inspection could be reproduced at a later date?
Yes / No  c Were the procedures appropriate to detect the targeted degradation mechanism?
Yes / No  d For quantitative inspections, were the procedures used adequate to collect quantitative information?
Yes / No 4  Did the licensee disposition direct or indirect NDE results in accordance with their procedural requirements?
Yes / No 5  Based on a sample of piping segments, is there evidence that licensees are substantially meeting the pressure testing requirements of ASME Section XI IWA
-5244? Yes / No}}

Latest revision as of 23:51, 5 February 2020

TI-182 Phase 2 RFI Final
ML14022A041
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 01/21/2014
From: Rivera-Ortiz J
NRC/RGN-II
To: Heacock D
Virginia Electric & Power Co (VEPCO)
References
Download: ML14022A041 (11)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 21, 2014 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060

SUBJECT:

NORTH ANNA POWER STATION - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Heacock:

On February 10, 2014, the Nuclear Regulatory Commission (NRC) will begin inspection activities for the North Anna Power Station, Units 1, and 2, in accordance with Temporary Instruction (TI) 2515-182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. This inspection is scheduled to be performed from February 10 - 12, 2014, and will address the inspection requirements for Phase 2 of this TI.

In order to minimize the impact to your on-site resources, and to ensure a productive inspection, we have enclosed a list of documents needed for the preparation and implementation of this inspection. The documents that are requested for this inspection include all relevant documents that will allow the inspector(s) to adequately complete Phase 2 of this inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Jay Lieberstein, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Robert Carrion at (404) 997-4522 or robert.carrion@nrc.gov.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide

D. Heacock 2 Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/ adams.html (the Public Electronic Reading Room).

Sincerely, RA Joel Rivera-Ortiz, (Acting) Chief Engineering Branch 3 Division of Reactor Safety Docket Nos.: 50-338 and 50-339 License Nos.: NPF-4 and NPF-7

Enclosure:

Temporary Instruction (TI 2515-182)

Inspection Document Request TI-182 Phase II Questions cc: Distribution via Listserv

__________ X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE RA RA NAME R. Carrion J. Rivera-Ortiz DATE 1/17/2014 1/21/2014 E-MAIL COPY? YES NO YES NO YES NO TEMPORARY INSTRUCTION 2515-182 INSPECTION DOCUMENT REQUEST Inspection Dates: February 10 - 12, 2014 Inspection Procedures: TI 2515-182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks Inspector: Robert Carrion, Senior Reactor Inspector Information Requested for the Preparation and Completion of the In-Office Inspection:

The following documents listed below are requested (electronic copy, if possible) by February 5, 2014, to facilitate the preparation for the on-site inspection week.

1. Contact information for plant staff responsible for the implementation of the underground piping and tanks program.
2. Copy of the documents governing the implementation of the sites underground piping and tanks program. For example, this includes administrative and implementing procedures for the program.
3. Please review the Attachment to this Enclosure, TI 2515-182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, Phase 2 Questions, and provide response to all the questions, as applicable.
4. Schedule for completion of the following NEI 09-14, Guideline for the Management of Underground Piping and Tank Integrity, Revision 3, attributes:

Buried Piping Procedures and Oversight Risk Ranking Inspection Plan Plan Implementation Asset Management Plan Underground Piping and Tanks Procedures and Oversight Prioritization Condition Assessment Plan Plan Implementation Asset Management Plan Information to be provided On-Site to the Inspector following the Entrance Meeting:

1. Copy or ready access to the program drawings showing the location of buried and underground piping and tanks within the scope of the program.
2. Copy or ready access to the industry standards and guidelines associated with the program.

Enclosure

2

3. Self- or third-party assessments of the underground piping and tanks program (if any have been performed).
4. Response to additional information requested prior to the inspection based on the response to the TI 2515-182 questions in the Attachment.
5. For any of the NEI 09-14 (Revision 3) attributes identified below which have been completed prior to the NRCs onsite inspection, provide written records that demonstrate that the program attribute is complete.

Buried Piping

  • Procedures and Oversight
  • Risk Ranking
  • Inspection Plan
  • Plan Implementation
  • Asset Management Plan Underground Piping and Tanks
  • Procedures and Oversight
  • Prioritization
  • Condition Assessment Plan
  • Plan Implementation
  • Asset Management Plan Inspector Contact Information Mailing Address Robert Carrion US NRC- Region II Sr. Reactor Inspector Attn: Robert Carrion 404-997-4522 245 Peachtree Center Avenue, Suite 1200 robert.carrion@nrc.gov Atlanta, GA 30303 Enclosure

TI 2515-182 Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks Phase 2 Questions Questions Response Question Subpart Number Initiative Consistency 1 a Has the licensee taken any deviations to either of Yes / No the initiatives?

b If so, what deviations have been taken and what is (are) the basis for these deviations?

2 a Does the licensee have an onsite buried piping Yes / No program manager (owner) and, potentially, a staff?

b How many buried piping program owners have there been since January 1, 2010?

c How many other site programs are assigned to the buried piping program owner?

3 a Does the licensee have requirements to capture Yes / No program performance, such as system health reports and performance indicators?

b Are these requirements periodic or event driven? Periodic /

Event Driven /

None c Are there examples where these requirements Yes / No have been successfully used to upgrade piping systems or to avert piping or tank leaks?

4 a Does the licensee have a program or procedure Yes / No to confirm the as-built location of buried and underground piping and tanks at the plant?

b Has the licensee used this program? Yes / No c Was the program effective in identifying the Yes / No location of buried pipe?

Attachment

2 5 For a sample of buried pipe and underground Yes / No piping and tanks (sample size at least 1 high and Sample size 1 low risk/priority pipe or tank), did the risk examined ranking and/or prioritization process utilized by _____

the licensee produce results in accordance with the initiative guidelines, i.e., which emphasize the importance of components which have a high likelihood and consequence of failure and deemphasize the importance of components which have a low likelihood and consequence of failure?

6 a As part of its risk ranking process did the Yes / No licensee estimate/determine the total length of buried/ underground piping included in the initiatives?

b As part of its risk ranking process did the Yes / No licensee estimate/determine the total length of high risk buried/underground piping included in the initiatives?

Preventive Actions / System Maintenance 1 a For uncoated steel piping, has the licensee Yes / No / Not developed a technical basis for concluding that Applicable (no structural (e.g. ASME Code minimum wall, if uncoated applicable) and leaktight integrity of buried piping buried steel can be maintained? pipe) b Is the technical basis provided as justification by Yes / No the licensee consistent with the initiative (including its reference documents) or industry standards (e.g. NACE SP0169) 2 a For buried steel, copper, or aluminum piping or Yes / No / Not tanks which are not cathodically protected, has Applicable (no the licensee developed a technical basis for buried steel, concluding that structural (e.g. ASME Code copper, or minimum wall, if applicable) and leaktight aluminum integrity of buried piping can be maintained? piping which is not cathodically protected) b Is the technical basis provided as justification by Yes / No the licensee consistent with the initiative (including its reference documents) or industry standards (e.g. NACE SP0169)

Attachment

3 3 a For licensees with cathodic protection systems, Yes / No / Not does the licensee have procedures for the Applicable (no maintenance, monitoring and surveys of this cathodic equipment? protection systems) b Are the licensee procedures consistent with the Yes / No initiative (including its reference documents) or industry standards (e.g. NACE SP0169)?

c Is the cathodic protection system, including the Yes / No evaluation of test data, being operated and maintained by personnel knowledgeable of, or trained in, such activities 4 Is there a program to ensure chase and vault Yes / No / N/A areas which contain piping or tanks subject to the (No piping in underground piping and tanks initiative are chases or monitored for, or protected against, accumulation vaults) of leakage from these pipes or tanks?

Inspection Activities / Corrective Actions 1 a Has the licensee prepared an inspection plan for Yes / No its buried piping and underground piping and tanks?

b Does the plan specify dates and locations where Yes / No inspections are planned?

c Have inspections, for which the planned dates Occurred as have passed, occurred as scheduled or have a scheduled /

substantial number of inspections been deferred? Deferred 2 a Has the licensee experienced leaks and/or Leaks Yes / No significant degradation in safety related piping or Degradation piping carrying licensed material since January 1, Yes / No 2009?

b If leakage or significant degradation did occur, Yes / No did the licensee determine the cause of the leakage or degradation?

Attachment

4 c Based on a review of a sample of root cause Yes / No / N/A analyses for leaks from buried piping or (no leaks) underground piping and tanks which are safety related or contain licensed material, did the licensee's corrective action taken as a result of the incident include addressing the cause of the degradation?

d Did the corrective action include an evaluation of Yes / No / N/A extent of condition of the piping or tanks and (no leaks) possible expansion of scope of inspections?

(Preference should be given to high risk piping and significant leaks where more information is likely to be available).

3 a Based on a review of a sample of NDE activities Yes / No which were either directly observed or for which records were reviewed, were the inspections conducted using a predetermined set of licensee/contractor procedures?

b Were these procedures sufficiently described and Yes / No recorded such that the inspection could be reproduced at a later date?

c Were the procedures appropriate to detect the Yes / No targeted degradation mechanism?

d For quantitative inspections, were the procedures Yes / No used adequate to collect quantitative information?

4 Did the licensee disposition direct or indirect NDE Yes / No results in accordance with their procedural requirements?

5 Based on a sample of piping segments, is there Yes / No evidence that licensees are substantially meeting the pressure testing requirements of ASME Section XI IWA-5244?

Attachment