| number = ML15197A032
| number = ML15197A032
| issue date = 07/13/2015
| issue date = 07/13/2015
| title = Calvert Cliffs, Units 1 and 2 - Submittal of Emergency Response Data System Revision
| title = Submittal of Emergency Response Data System Revision
| author name = Smith L D
| author name = Smith L
| author affiliation = Exelon Generation Co, LLC
| author affiliation = Exelon Generation Co, LLC
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Exe!.on GenerationLarry D. SmithRegulatory Assurance ManagerCalvert Cliffs Nuclear Power Plant1650 Calvert Cliffs ParkwayLusby, MD 20657410 495 5219 Office410 610 9729 Mobilewww.exeloncorp.comLa rry.Smith2@exeloncorp.com10 CFR 50, Appendix EJuly 13, 2015U. S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, DC 20555Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2Renewed Facility Operating License Nos. DPR-53 and DPR-69NRC Docket Nos. 50-317 and 50-318
{{#Wiki_filter:Larry D. Smith Regulatory Assurance Manager Exe!.on Generation                                                      Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 410 495 5219 Office 410 610 9729 Mobile www.exeloncorp.com La rry.Smith2@exeloncorp.com 10 CFR 50, Appendix E July 13, 2015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318


==Subject:==
==Subject:==
Emerqjencv Response Data SystemThe attached revision to the Emergency Response Data System (ERDS) Data Point Library forthe Calvert Cliffs Nuclear Power Plant is provided pursuant to 10 CFR Part 50, Appendix E,Section VI.3.a. The revision is described below.The table below provides a brief summary of the changes:Unit 1DPLPae Point ID Description of Change1) Plant Specific Point Description changed from LOG POWER toWide Range Power.2) Generic/Condition Description changed from NI WIDE RANGELOG REACTOR PWR to Nuclear Instruments, Power Range.1 1 Si 109 3) ENGR Units changed from % POWER to %.4) Minimum Instrument Range changed from 1 E-7 to 1 E-8.5) Unique System Description changed from '...provides a______logarithmic indication...' to '...provides an indication...'1) Number of Sensors changed from 32 to 16.2 1SP2112 2) Unique System Descriptions changed from "...strategically nearthe vicinity..." to ". ..strategically in a vacant CEA shroudassembly near the vicinity..."1) How Processed description changed to AVG EACHQUADRANT'S PTS, SHOW HIGH AVG2) Unique System Description changed to CORE EXITTHERMOCOUPLES ARE LOCATED AT THE TOP OF THE31SP2113 INCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN35 SELECTED FUEL ASSEMBLIES. THESE DETECTORSARE DIVIDED INTO QUADRANTS AND EACH QUADRANTIS AVERAGED. THIS POINT IS THE HIGHEST QUADRANTAVG.
Emerqjencv Response Data System The attached revision to the Emergency Response Data System (ERDS) Data Point Library for the Calvert Cliffs Nuclear Power Plant is provided pursuant to 10 CFR Part 50, Appendix E, Section VI.3.a. The revision is described below.
Document Control DeskJuly 13, 2015Page 2Unit 1DPLPaciePoint IDDescription of Changev 1) Minimum and Maximum Instrument Range fields changed toN/A.2) Number of sensors changed to 37 (35 CETs and 2 pressuresensors)41SP3123 3) Unique System Description changed to: CORE SUBCOOLEDMARGIN IS CALCULATED BY THE SATURATIONTEMPERATURE AS DETERMINED FROM PRESSURIZERPRESSURE (SP3120) MINUS THE CORE EXIT TEMP($P211 3).1) ENGR Units changed from % FLOW to %.51 F131 A 2) Number of sensors changed to 2 (1 per SG)3) Proc or Sens changed to P6 1SP3I17A No changes other than point ID.7 1SP3117B No changes other than point I D.8 1SP3116A No changes other than point ID.9 1SP3116B No changes other than point ID.1) Minimum and Maximum Instrument Range changed to N/A.10 1 Fl111% 2) Number of Sensors changed to 8.3) Unique System Description, first line updated to THIS IS ATEMPERATURE COMPENSATED FEED FLOW.11 1 Fl1121% 1) Minimum and Maximum Instrument Range changed to N/A.2) Number of Sensors changed to 812 1SP3118A Maximum Instrument Range changed to 1250.13 1SP3118B Maximum Instrument Range changed to 1250.14 1SP0106A No changes other than point ID.15 1 SP0106B No changes other than point ID.16 1SP3113A No changes other than point I D.17 1SP3113B No changes other than point ID.18 1 SP3120 No changes other than point ID.19 1 SP2109 No changes other than point ID.1) Proc or Sens changed to S.20 1SP1114 2) Number of Sensors changed to 13) Unique System Descriptions updated.21 1SP2115 No changes other than point ID.22 1SP2116 Proc or Sens changed to S.23 1 SP4112 No changes other than point ID.24 1 R5415! Proc or Sens changed to S.25 1S5P6120 How Processed changed to Inverse Log of Instrument Value.26 1SP6117 How Processed changed to Reference Unique System Description.
The table below provides a brief summary of the changes:
Document Control DeskJuly 13, 2015Page 3Unit 1Point IDDescription of Change27 1SP6121 No changes other than point ID.28 1 R5202! Proc or Sens changed to S.29 1 5421! 1) Proc or Sens changed to S.2) How Processed changed to Inverse Log of Instrument Value.30 1R5422! 1) Proc or Sens changed to S.2) How Processed changed to Inverse Log of Instrument Value.1) Proc or Sens changed to S.31 1R4014! 2) How Processed changed to Inverse Log of Instrument Value.3) Alarm / Trip Setpoints format changed to match other DPLentries.32 1SP4110 Unique System Descriptions updated.33 1SP4111 No changes other than point ID.1) Zero Point Reference changed to TNKBOT34 1SP2RWLVL 2) How Processed changed to WR sensor when outside NRsensor band35 1WS60#15M Engr Units changed to M/S (no spaces).36 1WD60#15M No changes other than point I D.37 1WS10#15M No changes other than point ID.38 1WD10#15M No changes other than point ID.39 1 MMSDTASTB No changes other than point ID.40 1 MMS_S60STB No changes other than point ID.Unit 2DPLPae Point ID Change1) Plant Specific Point Description changed from LOG POWER toWide Range Power.2) Generic/Condition Description changed from NI WIDE RANGE109 LOG REACTOR PWR to Nuclear Instruments, Power Range.1 25P13) ENGR Units changed from % POWER to %.4) Minimum Instrument Range changed from 1 E-7 to 1 E-8.5) Unique System Description changed from '...provides alogarithmic indication...' to '...provides an indication...'1) Number of Sensors changed from 32 to 16.2 2SP2112 2) Unique System Descriptions changed from "...strategically nearthe vicinity..." to "...strategically in a vacant CEA shroud_____ _____________ assembly near the vicinity..."
Unit 1 DPL Pae          Point ID                                 Description of Change
Document Control DeskJuly 13, 2015Page 4Unit 2Pae Point ID Change1) How Processed description changed to AVG EACHQUADRANT'S PTS, SHOW HIGH AVG2) Unique System Description changed to CORE EXITTHERMOCOUPLES ARE LOCATED AT THE TOP OF THE3 2SP2113 INCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN35 SELECTED FUEL ASSEMBLIES. THESE DETECTORSARE DIVIDED INTO QUADRANTS AND EACH QUADRANTIS AVERAGED. THIS POINT IS THE HIGHEST QUADRANTAVG.1) Minimum and Maximum Instrument Range fields changed toN/A.2) Number of sensors changed to 37 (35 CETs and 2 pressuresensors)3) Unique System Description changed to: CORE SUBCOOLED4 2SP3123 MARGIN IS CALCULATED BY THE SATURATIONTEMPERATURE AS DETERMINED FROM PRESSURIZERPRESSURE (SP3120) MINUS THE CORE EXIT TEMP(SF2113).4) How Processed changed to RE: USD (REFERENCE UNIQUESYS DESC).1) ENGR Units changed from % FLOW to %.5 2F131A 2) Number of sensors changed to 2 (1 per SG)3) Proc or Sens changedto P6 2SP3117A No changes other than point ID.7 2SP3117B No changes other than point ID.8 2SP31 16A Alarm / Trip Setpoints, X >= changed from 985 to 950.9 2SP311 6B Alarm / Trip Setpoints, X >= changed from 985 to 950.1) Minimum and Maximum Instrument Range changed to N/A.10 2F1 11% 2) Number of Sensors changed to 8.3) Unique System Description, first line updated to THIS IS ATEMPERATURE COMPENSATED FEED FLOW.1) Minimum and Maximum Instrument Range changed to N/A.11 2F1 121% 2) Number of Sensors changed to 83) Unique System Description, first line updated to THIS IS ATEMPERATURE COMPENSATED FEED FLOW.12 2SP3118A Maximum Instrument Range changed to 1250.13 2SP3118B Maximum Instrument Range changed to 1250.14 2SP0106A No changes other than point ID.15 2SP0106B No changes other than point ID.16 2SP3113A Alarm / Trip Setpoints, X <= changed from 504 to 525.17 2SP3113B Alarm I Trip Setpoints, X <= changed from 504 to 525.18 2SP3I20 No changes other than point ID.
: 1) Plant Specific Point Description changed from LOG POWER to Wide Range Power.
Document Control DeskJuly 13, 2015Page 5Unit 2Pae Point ID Change19 2SP2109 Alarm / Trip Setpoints, X >= changed from 300 to 305.1) Proc or Sens changed to S.20 2SPl114 2) Number of Sensors changed to 1_____________3) Unique System Descriptions updated,21 2SP2115 No changes other than point ID.22 2SP2116 Proc or Sens changed to S.23 2SP4112 No changes other than point ID.The "before" and "after" ERDS Data Point Library sheets are attached.There are no regulatory commitments contained in this correspondence.Should you have questions regarding this matter, please contact me at (410) 495-5219.Respectfully,Regulatory Assurance ManagerLDS/PSF/bjm
: 2) Generic/Condition Description changed from NI WIDE RANGE LOG REACTOR PWR to Nuclear Instruments, Power Range.
1       1Si 109           3) ENGR Units changed from % POWER to                 %.
: 4) Minimum Instrument Range changed from 1 E-7 to 1 E-8.
: 5) Unique System Description changed from '...provides                       a
______logarithmic                          indication...' to '...provides an indication...'
: 1) Number of Sensors changed from 32 to 16.
2               1SP2112           2) Unique System Descriptions changed from "...strategically near the vicinity..." to ". ..strategically     in a vacant CEA shroud assembly near the vicinity..."
: 1) How Processed description changed to AVG EACH QUADRANT'S PTS, SHOW HIGH AVG
: 2) Unique System Description changed to CORE EXIT THERMOCOUPLES ARE LOCATED AT THE TOP OF THE 31SP2113                            INCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN 35 SELECTED FUEL ASSEMBLIES. THESE DETECTORS ARE DIVIDED INTO QUADRANTS AND EACH QUADRANT IS AVERAGED. THIS POINT IS THE HIGHEST QUADRANT AVG.
 
Document Control Desk July 13, 2015 Page 2 Unit 1 DPL Pacie        Point ID                    Description of Change v            1) Minimum and Maximum Instrument Range fields changed to N/A.
: 2) Number of sensors changed to 37 (35 CETs and 2 pressure sensors) 41SP3123         3) Unique System Description changed to: CORE SUBCOOLED MARGIN      IS CALCULATED       BY THE       SATURATION TEMPERATURE AS DETERMINED FROM PRESSURIZER PRESSURE (SP3120) MINUS THE CORE EXIT TEMP
($P211 3).
: 1) ENGR Units changed from % FLOW to     %.
51       F131 A 2) Number of sensors changed to 2 (1 per SG)
: 3) Proc or Sens changed to P 6        1SP3I17A No changes other than point ID.
7         1SP3117B No changes other than point ID.
8         1SP3116A No changes other than point ID.
9         1SP3116B No changes other than point ID.
: 1) Minimum and Maximum Instrument Range changed to N/A.
10         1 Fl111% 2) Number of Sensors changed to 8.
: 3) Unique System Description, first line updated to THIS IS A TEMPERATURE COMPENSATED FEED FLOW.
11         1Fl1121% 1) Minimum and Maximum Instrument Range changed to N/A.
: 2) Number of Sensors changed to 8 12        1SP3118A Maximum Instrument Range changed to 1250.
13         1SP3118B Maximum Instrument Range changed to 1250.
14         1SP0106A No changes other than point ID.
15         1SP0106B  No changes other than point ID.
16         1SP3113A No changes other than point ID.
17         1SP3113B No changes other than point ID.
18         1 SP3120 No changes other than point ID.
19         1 SP2109 No changes other than point ID.
: 1) Proc or Sens changed to S.
20         1SP1114 2) Number of Sensors changed to 1
: 3) Unique System Descriptions updated.
21         1SP2115 No changes other than point ID.
22         1SP2116 Proc or Sens changed to S.
23         1SP4112  No changes other than point ID.
24         1 R5415! Proc or Sens changed to S.
25         1S5P6120 How Processed changed to Inverse Log of Instrument Value.
26         1SP6117 How Processed changed to Reference Unique System Description.
 
Document Control Desk July 13, 2015 Page 3 Unit 1 Point    IDDescription                     of Change 27            1SP6121         No changes other than point ID.
28             1 R5202!       Proc or Sens changed to S.
29       1 5421!       1) Proc or Sens changed to S.
: 2) How Processed changed to Inverse Log of Instrument Value.
30             1R5422!       1) Proc or Sens changed to S.
: 2) How Processed changed to Inverse Log of Instrument Value.
: 1) Proc or Sens changed to S.
31             1R4014!       2) How Processed changed to Inverse Log of Instrument Value.
: 3) Alarm / Trip Setpoints format changed to match other DPL entries.
32             1SP4110         Unique System Descriptions updated.
33             1SP4111         No changes other than point ID.
: 1) Zero Point Reference changed to TNKBOT 34          1SP2RWLVL         2) How Processed changed to WR sensor when outside NR sensor band 35          1WS60#15M         Engr Units changed to M/S (no spaces).
36         1WD60#15M         No changes other than point ID.
37         1WS10#15M         No changes other than point ID.
38         1WD10#15M         No changes other than point ID.
39       1 MMSDTASTB           No changes other than point ID.
40       1 MMS_S60STB         No changes other than point ID.
Unit 2 DPL Pae          Point ID                                       Change
: 1) Plant Specific Point Description changed from LOG POWER to Wide Range Power.
: 2) Generic/Condition Description changed from NI WIDE RANGE 109      LOG REACTOR PWR to Nuclear Instruments, Power Range.
1     25P13)             ENGR Units changed from % POWER to           %.
: 4) Minimum Instrument Range changed from 1 E-7 to 1 E-8.
: 5) Unique System Description changed from '...provides a logarithmic indication...' to '...provides an indication...'
: 1) Number of Sensors changed from 32 to 16.
2             2SP2112         2) Unique System Descriptions changed from "...strategically near the vicinity..." to "...strategically in a vacant CEA shroud
_____________             assembly near the vicinity..."
 
Document Control Desk July 13, 2015 Page 4 Unit 2 Pae      Point ID                               Change
: 1) How Processed description changed to AVG EACH QUADRANT'S PTS, SHOW HIGH AVG
: 2) Unique System Description changed to CORE EXIT THERMOCOUPLES ARE LOCATED AT THE TOP OF THE 3          2SP2113     INCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN 35 SELECTED FUEL ASSEMBLIES. THESE DETECTORS ARE DIVIDED INTO QUADRANTS AND EACH QUADRANT IS AVERAGED. THIS POINT IS THE HIGHEST QUADRANT AVG.
: 1) Minimum and Maximum Instrument Range fields changed to N/A.
: 2) Number of sensors changed to 37 (35 CETs and 2 pressure sensors)
: 3) Unique System Description changed to: CORE SUBCOOLED 4          2SP3123     MARGIN     IS CALCULATED         BY THE       SATURATION TEMPERATURE AS DETERMINED FROM PRESSURIZER PRESSURE (SP3120) MINUS THE CORE EXIT TEMP (SF2113).
: 4) How Processed changed to RE: USD (REFERENCE UNIQUE SYS DESC).
: 1) ENGR Units changed from % FLOW to %.
5         2F131A   2) Number of sensors changed to 2 (1 per SG)
: 3) Proc or Sens changedto P 6        2SP3117A No changes other than point ID.
7         2SP3117B No changes other than point ID.
8         2SP31 16A Alarm / Trip Setpoints, X >= changed from 985 to 950.
9         2SP311 6B Alarm / Trip Setpoints, X >= changed from 985 to 950.
: 1) Minimum and Maximum Instrument Range changed       to N/A.
10         2F1 11% 2) Number of Sensors changed to 8.
: 3) Unique System Description, first line updated to   THIS IS A TEMPERATURE COMPENSATED FEED FLOW.
: 1) Minimum and Maximum Instrument Range changed       to N/A.
11         2F1 121% 2) Number of Sensors changed to 8
: 3) Unique System Description, first line updated to   THIS IS A TEMPERATURE COMPENSATED FEED FLOW.
12         2SP3118A Maximum Instrument Range changed to 1250.
13         2SP3118B Maximum Instrument Range changed to 1250.
14         2SP0106A No changes other than point ID.
15         2SP0106B No changes other than point ID.
16         2SP3113A Alarm / Trip Setpoints, X <= changed from 504 to 525.
17         2SP3113B Alarm I Trip Setpoints, X <= changed from 504 to 525.
18         2SP3I20 No changes other than point ID.
 
Document Control Desk July 13, 2015 Page 5 Unit 2 Pae      Point ID                                     Change 19          2SP2109         Alarm / Trip Setpoints, X >= changed from 300 to 305.
: 1) Proc or Sens changed to S.
20         2SPl114         2) Number of Sensors changed to 1
_____________3)     Unique System Descriptions updated, 21         2SP2115         No changes other than point ID.
22         2SP2116         Proc or Sens changed to S.
23         2SP4112         No changes other than point ID.
The "before" and "after" ERDS Data Point Library sheets are attached.
There are no regulatory commitments contained in this correspondence.
Should you have questions regarding this matter, please contact me at (410) 495-5219.
Respectfully, Regulatory Assurance Manager LDS/PSF/bjm


==Attachment:==
==Attachment:==
Emergency Response Data System Data Point Library (80 pages)cc: NRC Project Manager, Calvert Cliffs NRC Resident Inspector, Calvert CliffsNRC Regional Administrator, Region I S. Gray, MD-DNR ATTACHM ENTEMERGENCY RESPONSE DATA SYSTEM DATA POINT LIBRARY(80 pages)Calvert Cliffs Nuclear Power PlantJuly 13, 2015 PWR Data Point Library Reference FileReport Date :Page :06-24-20151Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
Emergency Response Data System Data Point Library (80 pages) cc:     NRC Project Manager, Calvert Cliffs           NRC Resident Inspector, Calvert Cliffs NRC Regional Administrator, Region I         S. Gray, MD-DNR
 
ATTACHM ENT EMERGENCY RESPONSE DATA SYSTEM DATA POINT LIBRARY (80 pages)
Calvert Cliffs Nuclear Power Plant July 13, 2015
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            1 Date:                             5/4/2015 Reactor Unit:                     CC 1 Data Feeder:                       CCll NRC ERDS Parameter:               NI POWER RNG Point ID:                         1SPll109 Plant Specific Point


== Description:==
== Description:==
Generic I Condition
WIDE RANGE POWER Generic I Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum instrument Range:Zero Point  
NUCLEAR INSTRUMENTS, POWER RANGE Analog I Digital:                 A ENGR Units / Digital States:
ENGR Units Conversion:             N/A Minimum Instrument Range:         1E-8 Maximum instrument Range:         200 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 4 How Processed:                     AVG OF THE TWO CLOSEST CHANNEL VALUES Sensor Locations                  N/A Alarm I Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC 1CCllNI POWER RNG1SPll109WIDE RANGE POWERNUCLEAR INSTRUMENTS, POWER RANGEAN/A1E-8200N/AN/AP4AVG OF THE TWO CLOSEST CHANNEL VALUESN/AN/AN/AN/AN/AN/AN/AWIDE RANGE NUCLEAR INSTRUMENTATION PROVIDES AN INDICATION OFREACTOR POWER AS A PERCENT OF REACTOR POWER. START UP RATEREACTOR TRIP IS GIVEN FROM WIDE RANGE NUCLEAR INSTRUMENTSBETWEEN THE RANGE OF 1 E-4% TO 15% POWER. THESE DETECTORSARE FISSION CHAMBERS WHICH DO NOT GET DEENERGIZED DURINGNORMAL POWER OPERATIONS.
WIDE RANGE NUCLEAR INSTRUMENTATION PROVIDES AN INDICATION OF REACTOR POWER AS A PERCENT OF REACTOR POWER. START UP RATE REACTOR TRIP IS GIVEN FROM WIDE RANGE NUCLEAR INSTRUMENTS BETWEEN THE RANGE OF 1E-4% TO 15% POWER. THESE DETECTORS ARE FISSION CHAMBERS WHICH DO NOT GET DEENERGIZED DURING NORMAL POWER OPERATIONS.
PWR Data Point Library Reference FileReport Date : 06-24-2015Page : 2Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :         06-24-2015 Page :               2 Date:                             5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               REC VES LEV Point ID:                         1SP2112 Plant Specific Point


== Description:==
== Description:==
Generic I Condition
REACTOR VESSEL LEVEL Generic I Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
REACTOR VESSEL WATER LEVEL Analog / Digital:                 A ENGR Units / Digital States:       INCHES ENGR Units Conversion:             N/A Minimum Instrument Range:         N/A Maximum Instrument Range:         N/A Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
FAP Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 16 How Processed:                     RE:USD (REFERENCE UNIQUE SYS DESC)
Sensor Locations                  160,151,112,71,50,29,19, & 10" ABOVE FAP Alarm / Trip Setpoints:           VOID DETECTED NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllREC VES LEV1SP2112REACTOR VESSEL LEVELREACTOR VESSEL WATER LEVELAINCHESN/AN/AN/AFAPN/AP16RE:USD (REFERENCE UNIQUE SYS DESC)160,151,112,71,50,29,19, & 10" ABOVE FAPVOID DETECTEDN/AN/AN/AN/AN/A8 HEATED JUNCTION THERMOCOUPLES (HJTC) ARE SPACEDSTRATEGICALLY IN A VACANT CEA SHROUD ASSEMBLY NEAR THEVICINITY OF ONE HOT LEG OUTLET NOZZLE. AS HJTC IS UNCOVEREDTHE LVL THAT THE REACTOR HEAD IS UNCOVERED IS INDICATED ININCREMENTAL STEPS. THE 1ST HJTC IS 160" FROM TOP OF FUELALIGNMENT PLATE(FAP); 8TH HJTC IS 10" FROM FAP; 5TH HJTC IS 50"FROM FAP WHICH IS THE CENTER LINE OF THE HOT LEGS. HOWPROCESSED: WHEN LVL DECREASES A VOID IN THE HJTC WILL PROVIDEAN OUTPUT SIGNAL FOR THAT SPECIFIC HJTC POSITION.
8 HEATED JUNCTION THERMOCOUPLES (HJTC) ARE SPACED STRATEGICALLY IN A VACANT CEA SHROUD ASSEMBLY NEAR THE VICINITY OF ONE HOT LEG OUTLET NOZZLE. AS HJTC IS UNCOVERED THE LVL THAT THE REACTOR HEAD IS UNCOVERED IS INDICATED IN INCREMENTAL STEPS. THE 1ST HJTC IS 160" FROM TOP OF FUEL ALIGNMENT PLATE(FAP); 8TH HJTC IS 10" FROM FAP; 5TH HJTC IS 50" FROM FAP WHICH IS THE CENTER LINE OF THE HOT LEGS. HOW PROCESSED: WHEN LVL DECREASES A VOID INTHE HJTC WILL PROVIDE AN OUTPUT SIGNAL FOR THAT SPECIFIC HJTC POSITION.
PWR Data Point Library Reference FileReport Date :Page :06-24-20153Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            3 Date:                             5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CC1 1 NRC ERDS Parameter:               TEMP CORE EX Point ID:                         1SP2113 Plant Specific Point


== Description:==
== Description:==
Generic / Condition
CORE EXIT TEMP Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
HIGHEST TEMP AT THE CORE EXIT Analog I Digital:                 A ENGR Units / Digital States:       DEGF ENGR Units Conversion:             N/A Minimum Instrument Range:         40 Maximum Instrument Range:         2300 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sons:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes            N/A Proc or Sons:                     P Number of Sensors:               35 How Processed:                   AVG EACH QUADRANT'S PTS:SHOW HIGH AVG Sensor Locations                  N/A Alarm / Trip Setpoints:           X >= 650 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CC1 1TEMP CORE EX1SP2113CORE EXIT TEMPHIGHEST TEMP AT THE CORE EXITADEGFN/A402300N/AN/AP35AVG EACH QUADRANT'S PTS:SHOW HIGH AVGN/AX >= 650N/AN/AN/AN/AN/ACORE EXIT THERMOCOUPLES ARE LOCATED AT THE TOP OF THEINCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN 35 SELECTEDFUEL ASSEMBLIES. THESE DETECTORS ARE DIVIDED INTO QUADRANTSAND EACH QUADRANT IS AVERAGED. THIS POINT IS THE HIGHESTQUADRANT AVG.
CORE EXIT THERMOCOUPLES ARE LOCATED AT THE TOP OF THE INCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN 35 SELECTED FUEL ASSEMBLIES. THESE DETECTORS ARE DIVIDED INTO QUADRANTS AND EACH QUADRANT IS AVERAGED. THIS POINT IS THE HIGHEST QUADRANT AVG.
PWR Data Point Library Reference Fi~eReport Date :Page :06-24-20154Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference Fi~e Report Date :       06-24-2015 Page :              4 Date:                             5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               SUB MARGIN Point ID:                         1SP3123 Plant Specific Point


== Description:==
== Description:==
Generic / Condition
CORE SUBCOOLED MARGIN Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
SATURATION TEMPERATURE-HIGH CET Analog I Digital:                 A ENGR Units / Digital States:       DEGF ENGR Units Conversion:             N/A Minimum Instrument Range:         N/A Maximum Instrument Range:         N/A Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 37 How Processed:                     RE:USD (REFERENCE UNIQUE SYS DESC)
Sensor Locations                  N/A Alarm I Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllSUB MARGIN1SP3123CORE SUBCOOLED MARGINSATURATION TEMPERATURE-HIGH CETADEGFN/AN/AN/AN/AN/AP37RE:USD (REFERENCE UNIQUE SYS DESC)N/AN/AN/AN/AN/AN/AN/ACORE SUBCOOLED MARGIN IS CALCULATED BY THE SATURATIONTEMPERATURE AS DETERMINED FROM PRESSURIZER PRESSURE(SP3120) MINUS THE CORE EXIT TEMP (SP211 3).
CORE SUBCOOLED MARGIN IS CALCULATED BY THE SATURATION TEMPERATURE AS DETERMINED FROM PRESSURIZER PRESSURE (SP3120) MINUS THE CORE EXIT TEMP (SP211 3).
PWR Data Point Library Reference FileReport Date :Page :06-24-20155Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :   06-24-2015 Page :         5 Date:                              5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               CORE FLOW Point ID:                         1F131A Plant Specific Point


== Description:==
== Description:==
Generic / Condition
RCS TOTAL FLOW CH A Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
TOTAL REACTOR COOLANT FLOW Analog I Digital:                 A ENGR Units I Digital States:
ENGR Units Conversion:             100% RX COOLANT FLOW = 370,000 GPM Minimum Instrument Range:         -53.57 Maximum Instrument Range:         151.48 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:-Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     N/A Sensor Locations                  N/A Alarm / Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:-             N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllCORE FLOW1F131ARCS TOTAL FLOW CH ATOTAL REACTOR COOLANT FLOWA100% RX COOLANT FLOW = 370,000 GPM-53.57151.48N/AN/AP2N/AN/AN/AN/AN/AN/AN/AN/AREACTOR COOLANT FLOW IS DETERMINED BY THE D/P ACROSS THESTEAM GENERATORS. WHERE TOTAL FLOW IS THE SUM OF BOTH LOOPFLOWS.
REACTOR COOLANT FLOW IS DETERMINED BY THE D/P ACROSS THE STEAM GENERATORS. WHERE TOTAL FLOW IS THE SUM OF BOTH LOOP FLOWS.
PWR Data Point Library Reference FileReport Date :Page :06-24-20156Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            6 Date:                             5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       OCil1 NRC ERDS Parameter:               SG LEVEL 1/A Point ID:                           1SP3117A Plant Specific Point


== Description:==
== Description:==
Generic / Condition
SG LEVEL LOOP 11 Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STEAM GENERATOR 11 WATER LEVEL Analog I Digital:                 A ENGR Units / Digital States:       INCH ES ENGR Units Conversion:             N/A Minimum Instrument Range:         -401.0 Maximum Instrument Range:         63.5 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              0" = 40" ABOVE THE FEED RING Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                  N/A Alarm I Trip Setpoints:           X >= 50  X <=-170 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               WET Unique System


== Description:==
== Description:==
5/4/2015CC1OCil1SG LEVEL 1/A1SP3117ASG LEVEL LOOP 11STEAM GENERATOR 11 WATER LEVELAINCH ESN/A-401.063.5N/A0" = 40" ABOVE THE FEED RINGP2AVG OFN/AX >= 50TWO CHANNELSX <=-170N/AN/AN/AN/AWETA LOW LEVEL REACTOR TRIP OCCURS AT -50" AS READ ON THE NARROWRANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170' AS READ ONTHE WIDE RANGE SIG LVL DETECTOR. POINT ID SP3117A IS A WIDERANGE LVL INDICATOR.
A LOW LEVEL REACTOR TRIP OCCURS AT -50" AS READ ON THE NARROW RANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170' AS READ ON THE WIDE RANGE SIG LVL DETECTOR. POINT ID SP3117A IS A WIDE RANGE LVL INDICATOR.
PWR Data Point Library Reference FileReport Date :Page :06-24-20157Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :             7 Date:                              5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               SG LEVEL 2/B Point ID:                         1SP3117B Plant Specific Point


== Description:==
== Description:==
Generic I Condition
SG LEVEL LOOP 12 Generic I Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STEAM GENERATOR 12 WATER LEVEL Analog I Digital:                   A ENGR Units I Digital States:       INCHES ENGR Units Conversion:             N/A Minimum Instrument Range:         -401.0 Maximum Instrument Range:         63.5 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              0' = 40" ABOVE THE FEED RING Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                    N/A Alarm I Trip Setpoints:             X>=50    X<=-170 NI Detector Power Supply Cut-Off Power Level:         N/A NI Detector Power Supply Turn-on Power Level:         N/A instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               WET Unique System


== Description:==
== Description:==
5/4/2015CC1CCllSG LEVEL 2/B1SP3117BSG LEVEL LOOP 12STEAM GENERATOR 12 WATER LEVELAINCHESN/A-401.063.5N/A0' = 40" ABOVE THE FEED RINGP2AVG OF TWO CHANNELSN/AX>=50 X<=-170N/AN/AN/AN/AWETA LOW LEVEL REACTOR TRIP OCCURS AT -50" AS READ ON THE NARROWRANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170" AS READ ONTHE WIDE RANGE SIG LVL DETECTOR. POINT ID SP3117B IS A WIDERANGE LVL INDICATOR.
A LOW LEVEL REACTOR TRIP OCCURS AT -50" AS READ ON THE NARROW RANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170" AS READ ON THE WIDE RANGE SIG LVL DETECTOR. POINT ID SP3117B IS A WIDE RANGE LVL INDICATOR.
PWR Data Point Library Reference FileReport Date : 06-24-2015Page : 8Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :   06-24-2015 Page :           8 Date:                             5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               SG PRESS 1/A Point ID:                         1SP3116A Plant Specific Point


== Description:==
== Description:==
Generic I Condition
SG PRESSURE LOOP 11 Generic I Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STEAM GENERATOR 11 PRESSURE Analog I Digital:                 A ENGR Units I Digital States:       PSIA ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:         1200 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                  N/A Alarm I Trip Setpoints:           X>= 950 X<= 703 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllSG PRESS 1/A1SP3116ASG PRESSURE LOOP 11STEAM GENERATOR 11 PRESSUREAPSIAN/A01200N/AN/AP2AVG OF TWO CHANNELSN/AX>= 950 X<= 703N/AN/AN/AN/AN/AREACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEATEXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LINE RUPTURE ORCOMP FAILURE.
REACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEAT EXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LINE RUPTURE OR COMP FAILURE.
PWR Data Point Library Reference FileReport Date :Page :06-24-20159Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :   06-24-2015 Page :           9 Date:                            5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               SG PRESS 2/B Point ID:                         1SP3116B Plant Specific Point


== Description:==
== Description:==
Generic I Condition
SG PRESSURE LOOP 12 Generic I Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STEAM GENERATOR 12 PRESSURE Analog I Digital:                 A ENGR Units I Digital States:       PSIA ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:         1200 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm /Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     p Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                  N/A Alarm /Trip Setpoints:             X>=950 X<=703 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllSG PRESS 2/B1SP3116BSG PRESSURE LOOP 12STEAM GENERATOR 12 PRESSUREAPSIAN/A01200N/AN/Ap2AVG OF TWO CHANNELSN/AX>=950 X<=703N/AN/AN/AN/AN/AREACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEATEXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LiNE RUPTURE OFCOMP FAILURE.
REACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEAT EXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LiNE RUPTURE OF COMP FAILURE.
PWR Data Point Library Reference FileReport Date :Page :06-24-201510Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            10 Date:                             5/4/2015 Reactor Unit:
CCll Data Feeder:
NRC ERDS Parameter:               MN FD FL 1/A Point ID:                         1F1111%
Plant Specific Point


== Description:==
== Description:==
Generic / Condition
FW FLOW TO STEAM GEN. 11 Generic / Condition


== Description:==
== Description:==
Analog!/ Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 11 MAIN FEEDWATER FLOW Analog!/ Digital:                 A ENGR Units I Digital States:       KLB/HR ENGR Units Conversion:             N/A Minimum Instrument Range:         N/A Maximum Instrument Range:         N/A Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 8 How Processed:                     COMPLEX Sensor Locations                  N/A Alarm I Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:
Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CCllMN FD FL 1/A1F1111%FW FLOW TO STEAM GEN. 11STM GEN 11 MAIN FEEDWATER FLOWAKLB/HRN/AN/AN/AN/AN/AP8COMPLEXN/AN/AN/AN/AN/AN/ATHIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVENMAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATEREXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEEDREG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONEDTO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARERUNNING.
THIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVEN MAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATER EXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEED REG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONED TO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARE RUNNING.
PWR Data Point Library Reference FileReport Date :Page :06-24-201511Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            11 Date:                             5/4/2015 Reactor Unit:                       CC1 Data Feeder:                       CCll NRC ERDS Parameter:                 MN FD FL 2/B Point ID:                         1F1121%
Plant Specific Point


== Description:==
== Description:==
Generic I Condition
FW FLOW TO STEAM GEN. 12 Generic I Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 12 MAIN FEEDWATER FLOW Analog I Digital:                   A ENGR Units I Digital States:       KLB/HR ENGR Units Conversion:             N/A Minimum Instrument Range:           N/A Maximum Instrument Range:           N/A Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                       P Number of Sensors:                 8 How Processed:                     COMPLEX Sensor Locations                    N/A Alarm / Trip Setpoints:             N/A NI Detector Power Supply Cut-Off Power Level:         N/A NI Detector Power Supply Turn-on Power Level:         N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:
Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllMN FD FL 2/B1F1121%FW FLOW TO STEAM GEN. 12STM GEN 12 MAIN FEEDWATER FLOWAKLB/HRN/AN/AN/AN/AN/AP8COMPLEXN/AN/AN/AN/AN/AN/ATHIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVENMAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATEREXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEEDREG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONEDTO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARERUNNING.
THIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVEN MAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATER EXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEED REG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONED TO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARE RUNNING.
PWR Data Point Library Reference FileReport Date :Page :06-24-201512Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            12 Date:                               5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               AX FD FL 1/A Point ID:                           1SP3118A Plant Specific Point


== Description:==
== Description:==
Generic / Condition
AUX FEED FLOW LOOP 11 Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 11 AUXILIARY FW FLOW Analog I Digital:                 A.
ENGR Units / Digital States:       GPM ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:           1250 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCH Sensor Locations                  N/A Alarm / Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllAX FD FL 1/A1SP3118AAUX FEED FLOW LOOP 11STM GEN 11 AUXILIARY FW FLOWA.GPMN/A01250N/AN/AP2SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCHN/AN/AN/AN/AN/ANN/ATHERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRICDRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMONHEADER FOR BOTH #11 & #12 STM GENS. THE MOTOR DRIVEN PUMPDISCHARGES TO A SEPARATE HEADER FOR BOTH #11 & #12 STM GENS.BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOREACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM#12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP ISNORMALLY ALIGNED TO START.
THERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRIC DRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMON HEADER FOR BOTH #11 &#12 STM GENS. THE MOTOR DRIVEN PUMP DISCHARGES TO A SEPARATE HEADER FOR BOTH #11 &#12 STM GENS.
PWR Data Point Library Reference FileReport Date :Page :06-24-201513Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOR EACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM
                                  #12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP IS NORMALLY ALIGNED TO START.
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            13 Date:                             5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               AX FD FL 2/B Point ID:                           1SP3I18B Plant Specific Point


== Description:==
== Description:==
Generic / Condition
AUX FEED FLOW LOOP 12 Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 12 AUXILIARY FW FLOW Analog I Digital:                 A ENGR Units / Digital States:       GPM ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:           1250 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Tem perature Comnpensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCH Sensor Locations                  N/A Alarm I Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Tem perature Comnpensation for DP Transmitters:               N Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllAX FD FL 2/B1SP3I18BAUX FEED FLOW LOOP 12STM GEN 12 AUXILIARY FW FLOWAGPMN/A01250N/AN/AP2SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCHN/AN/AN/AN/AN/ANN/ATHERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRICDRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMONHEADER FOR BOTH #11 & #12 STM GENS. THE MOTOR DRIVEN PUMPDISCHARGES TO A SEPARATE HEADER FOR BOTH #11 & #12 STM GENS.BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOREACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM#12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP ISNORMALLY ALIGNED TO START.
THERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRIC DRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMON HEADER FOR BOTH #11 &#12 STM GENS. THE MOTOR DRIVEN PUMP DISCHARGES TO A SEPARATE HEADER FOR BOTH #11 & #12 STM GENS.
PWR Data Point Library Reference FileReport Date : 06-24-2015Page : 14Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOR EACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM
                                  #12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP IS NORMALLY ALIGNED TO START.
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :           14 Date:                             5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               HL TEMP 1/A Point ID:                         1SP0106A Plant Specific Point


== Description:==
== Description:==
Generic / Condition
THOT LOOP 11 Generic / Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 11 INLET TEMPERATURE Analog / Digital:                 A ENGR Units I Digital States:       DEGF ENGR Units Conversion:             N/A Minimum Instrument Range:         50 Maximum Instrument Range:         700 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                  N/A Alarm / Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllHL TEMP 1/A1SP0106ATHOT LOOP 11STM GEN 11 INLET TEMPERATUREADEGFN/A50700N/AN/AP2AVG OF TWO CHANNELSN/AN/AN/AN/AN/AN/AN/ATHOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THESTEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGINMONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUITFOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTIONSYSTEM.
THOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THE STEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUIT FOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM.
PWR Data Point Library Reference FileReport Date :Page :06-24-201515Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            15 Date:                             5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               HL TEMP 2/B Point ID:                         1SP0I06B Plant Specific Point


== Description:==
== Description:==
Generic / Condition
THOT LOOP 12 Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 12 INLET TEMPERATURE Analog I Digital:                 A ENGR Units / Digital States:       DEGF ENGR Units Conversion:             N/A Minimum Instrument Range:         50 Maximum Instrument Range:         700 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                  N/A Alarm / Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllHL TEMP 2/B1SP0I06BTHOT LOOP 12STM GEN 12 INLET TEMPERATUREADEGFN/A50700N/AN/AP2AVG OF TWO CHANNELSN/AN/AN/AN/AN/AN/AN/ATHOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THESTEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGINMONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUITFOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTIONSYSTEM.
THOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THE STEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUIT FOR A TOTAL POWER CALCULATION INTHE REACTOR PROTECTION SYSTEM.
PWR Data Point Library Reference FileReport Date :Page :06-24-201516Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :             16 Date:                              5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               CL TEMP 1/A Point ID:                         1 SP3I113A Plant Specific Point


== Description:==
== Description:==
Generic / Condition
TCOLD LOOP 11 Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 11 OUTLET TEMPERATURE Analog I Digital:                 A ENGR Units / Digital States:       DEGF ENGR Units Conversion:             N/A Minimum Instrument Range:         50 Maximum Instrument Range:         700 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 3 How Processed:                     AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)
Sensor Locations                  N/A Alarm / Trip Setpoints:           X>= 560 X<=525 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllCL TEMP 1/A1 SP3I113ATCOLD LOOP 11STM GEN 11 OUTLET TEMPERATUREADEGFN/A50700N/AN/AP3AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)N/AX>= 560 X<=525N/AN/AN/AN/AN/ATHE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SETPOINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANELINDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLEDMARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP)CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTORPROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TOBE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.
THE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SET POINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANEL INDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP)
PWR Data Point Library Reference FileReport Date :Page :06-24-201517Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TO BE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :             17 Date:                              5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               CL TEMP 2/B Point ID:                         1SP3I13B Plant Specific Point


== Description:==
== Description:==
Generic I Condition
TCOLD LOOP 12 Generic I Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 12 OUTLET TEMPERATURE Analog / Digital:                 A ENGR Units / Digital States:       DEGF ENGR Units Conversion:             N/A Minimum Instrument Range:         50 Maximum Instrument Range:         700 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm/ITrip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temnperature Comnpensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 3 How Processed:                     AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)
Sensor Locations                  N/A Alarm/ITrip Setpoints:             X>=560 X<=525 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temnperature Comnpensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllCL TEMP 2/B1SP3I13BTCOLD LOOP 12STM GEN 12 OUTLET TEMPERATUREADEGFN/A50700N/AN/AP3AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)N/AX>=560 X<=525N/AN/AN/AN/AN/ATHE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SETPOINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANELINDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLEDMARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TMILP)CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTORPROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TOBE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.
THE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SET POINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANEL INDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TMILP)
PWR Data Point Library Reference FileReport Date : 06-24-2015Page : 18Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TO BE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.
 
PWR Data Point Library Reference File Report Date :       06-24-2015 Page :             18 Date:                             5/4/2015 Reactor Unit:                       CC1 Data Feeder:                       CC11 NRC ERDS Parameter:                 RCS PRESSURE Point ID:                         1 SP3120 Plant Specific Point


== Description:==
== Description:==
Generic I Condition
PRESSURIZER PRESSURE Generic I Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
REACTOR COOLANT SYSTEM PRESSURE Analog / Digital:                 A ENGR Units / Digital States:       PSIA ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:         4000 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                  N/A Alarm / Trip Setpoints:           X >= 2400 X <= 1740 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CC11RCS PRESSURE1 SP3120PRESSURIZER PRESSUREREACTOR COOLANT SYSTEM PRESSUREAPSIAN/A04000N/AN/AP2AVG OF TWO CHANNELSN/AX >= 2400 X <= 1740N/AN/AN/AN/AN/AREACTOR COOLANT PRESSURE IS THE AVERAGE OF 2 WIDE RANGEPRESSURIZER PRESSURE DETECTORS. THE SAFETY VALVES ARE SETTO OPEN AT 2500#. HIGH PRESSURE REACTOR TRIP OCCURS AT 2400#.PORVS OPEN AT 2400 PSIA ON A REACTOR TRIP FROM HIGH PRESSURE.SPRAY VALVE SETPOINT IS DEPENDENT ON CONTROLLER SETPOINT.BOTH SPRAY VALVES CLOSE AT 2300 PSIA. ESFAS ACTUATION ISINITIATED AT 1 740#.
REACTOR COOLANT PRESSURE IS THE AVERAGE OF 2 WIDE RANGE PRESSURIZER PRESSURE DETECTORS. THE SAFETY VALVES ARE SET TO OPEN AT 2500#. HIGH PRESSURE REACTOR TRIP OCCURS AT 2400#.
PWR Data Point Library Reference FileReport Date :Page :06-24-201519Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
PORVS OPEN AT 2400 PSIA ON A REACTOR TRIP FROM HIGH PRESSURE.
SPRAY VALVE SETPOINT IS DEPENDENT ON CONTROLLER SETPOINT.
BOTH SPRAY VALVES CLOSE AT 2300 PSIA. ESFAS ACTUATION IS INITIATED AT 1740#.
 
PWR Data Point Library Reference File Report Date :       06-24-2015 Page :              19 Date:                             5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CC11 NRC ERDS Parameter:               PRZR LEVEL Point ID:                         1SP2109 Plant Specific Point


== Description:==
== Description:==
Generic / Condition
PRESSURIZER LEVEL Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
PRIMARY SYSTEM PRESSURIZER LEVEL Analog I Digital:                 A ENGR Units I Digital States:       INCHES ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:         360 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Tem perature Comnpensationfor DP Transmitters:Level Reference Leg:Unique System
RE: USD Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                  N/A Alarm / Trip Setpoints:           X>=305    X<=50 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Tem perature Comnpensation for DP Transmitters:               N/A Level Reference Leg:               WET Unique System


== Description:==
== Description:==
5/4/2015CC1CC11PRZR LEVEL1SP2109PRESSURIZER LEVELPRIMARY SYSTEM PRESSURIZER LEVELAINCHESN/A0360RE: USDN/AP2AVG OF TWO CHANNELSN/AX>=305 X<=50N/AN/AN/AN/AWETPRESSURIZER LEVEL IS NORMALLY CONTROLLED IN A BAND BETWEEN160' TO 216" DURING NORMAL POWER OPERATIONS. PRESSURIZERHEATERS CUTOUT AT A LEVEL OF 101" IN THE PRESSURIZER.PRESSURIZER HEATERS WJLL START TO BE UNCOVERED AT APPROX 84"OF INDICATED LEVEL. ZERO POINT  
PRESSURIZER LEVEL IS NORMALLY CONTROLLED IN A BAND BETWEEN 160' TO 216" DURING NORMAL POWER OPERATIONS. PRESSURIZER HEATERS CUTOUT AT A LEVEL OF 101" INTHE PRESSURIZER.
PRESSURIZER HEATERS WJLL START TO BE UNCOVERED AT APPROX 84" OF INDICATED LEVEL. ZERO POINT  


==REFERENCE:==
==REFERENCE:==
BOTTIOM OFPRESSURIZER.
BOTTIOM OF PRESSURIZER.
PWR Data Point Library Reference FileReport Date :Page :06-24-201520Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            20 Date:                             5/4/2015 Reactor Unit:                     CC1 Data Feeder:                     CCll NRC ERDS Parameter:               RCS CHG/MU Point ID:                         1SPil114 Plant Specific Point


== Description:==
== Description:==
Generic I Condition
CHG PUMP FLOW Generic I Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
PRIMARY SYSTEM CHARGING/MAKEUP F Analog I Digital:                 A ENGR Units / Digital States:       GPM ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:         150 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     S Number of Sensors:                 1 How Processed:                     RE:USD (REFERENCE UNIQ SYS DESC)
Sensor Locations                  N/A Alarm I Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllRCS CHG/MU1SPil114CHG PUMP FLOWPRIMARY SYSTEM CHARGING/MAKEUP FAGPMN/A0150N/AN/AS1RE:USD (REFERENCE UNIQ SYS DESC)N/AN/AN/AN/AN/ANN/ATHERE ARE 3 CHARGING PUMPS THAT ARE RATED TO SUPPLY 44 GPMEACH TO THE RCS (REACTOR COOLANT SYSTEM). CHARGING PUMP #13CAN BE POWERED FROM ONE OF TWO BUSSES #11 OR #14. WHICH MUSTBE MANUALLY SELECTED BY A "KIRK" KEY INTERLOCK SCHEME.
THERE ARE 3 CHARGING PUMPS THAT ARE RATED TO SUPPLY 44 GPM EACH TO THE RCS (REACTOR COOLANT SYSTEM). CHARGING PUMP #13 CAN BE POWERED FROM ONE OF TWO BUSSES #11 OR #14. WHICH MUST BE MANUALLY SELECTED BY A "KIRK" KEY INTERLOCK SCHEME.
PWR Data Point Library Reference FileReport Date :Page :06-24-201521Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            21 Date:                             5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               HP SI FLOW Point ID:                         1SP2115 Plant Specific Point


== Description:==
== Description:==
Generic / Condition
HPSI FLOW Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
HIGH PRESSURE SAFETY INJECTION F Analog I Digital:                 A ENGR Units / Digital States:       GPM ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:         1600 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 4 How Processed:                     SUM OF FLOW LOOPS 11A, 11B, 12A, 12B Sensor Locations                  N/A Alarm I Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllHP SI FLOW1SP2115HPSI FLOWHIGH PRESSURE SAFETY INJECTION FAGPMN/A01600N/AN/AP4SUM OF FLOW LOOPS 11A, 11B, 12A, 12BN/AN/AN/AN/AN/ANN/A3 HIGH PRESSURE SAFETY INJECTION PUMPS DELIVER EMERGENCYCOOLANT TO ALL FOUR COLD LEGS. SHUTOFF HEAD PRESSURE IS 1275PSIA. ONLY TWO PUMPS WILL START. 12 HPSI IS MAINTAINED IN PULL TOLOCK. 2 INDEPENDENT SUCTION HEADERS SUPPLY WATER FROM THEREFUELING WATER TANK UNTIL THE TANK IS DOWN TO 10% FULL. AFTERTHE RWTI IS DOWN TO 10% FULL THE HPSI LINE IS CHANGED TOPROVIDE SUCTION FROM THE CONTAINMENT SUMP.
3 HIGH PRESSURE SAFETY INJECTION PUMPS DELIVER EMERGENCY COOLANT TO ALL FOUR COLD LEGS. SHUTOFF HEAD PRESSURE IS 1275 PSIA. ONLY TWO PUMPS WILL START. 12 HPSI IS MAINTAINED IN PULL TO LOCK. 2 INDEPENDENT SUCTION HEADERS SUPPLY WATER FROM THE REFUELING WATER TANK UNTIL THE TANK IS DOWN TO 10% FULL. AFTER THE RWTI IS DOWN TO 10% FULL THE HPSI LINE IS CHANGED TO PROVIDE SUCTION FROM THE CONTAINMENT SUMP.
PWR Data Point Library Reference FileReport Date :Page :06-24-201522Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :           22 Date:                            5/4/2015 Reactor Unit:                     CC1 Data Feeder:                     CCll NRC ERDS Parameter:               LP SI FLOW Point ID:                         lSP2116 Plant Specific Point


== Description:==
== Description:==
Generic 1 Condition
LPSI FLOW Generic 1Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:-Maximum Instrument Range:Zero Point  
LOW PRESSURE SAFETY INJECTION FL Analog I Digital:                 A ENGR Units I Digital States:       GPM ENGR Units Conversion:             N/A Minimum Instrument Range:         0
-Maximum     Instrument Range:       8000 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes            N/A Proc or Sens:                     S Number of Sensors:               1 How Processed:                   INSTRUMENT VALUE Sensor Locations                  N/A Alarm I Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:
Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllLP SI FLOWlSP2116LPSI FLOWLOW PRESSURE SAFETY INJECTION FLAGPMN/A08000N/AN/AS1INSTRUMENT VALUEN/AN/AN/AN/AN/AN/A2 LOW PRESSURE SAFETY INJECTION PUMPS SUPPLY LOW HEAD/HIGHVOLUME COOLANT TO THE COLD LEGS. EACH LPSI PUMP TAKES ASUCTION OFF A SEPARATE HEADER FROM THE RWT. DURINGRECIRCULATION MODE (APPROX 36 MIN AFTER A D.B.A.) THE LPSI PUMPSARE SHUT DOWN AND THE HPSI PUMPS TAKE SUCTION FROM THECONTAIMENT SUMP TO RECIRCULATE WATER THROUGH THE SYSTEM.
2 LOW PRESSURE SAFETY INJECTION PUMPS SUPPLY LOW HEAD/HIGH VOLUME COOLANT TO THE COLD LEGS. EACH LPSI PUMP TAKES A SUCTION OFF A SEPARATE HEADER FROM THE RWT. DURING RECIRCULATION MODE (APPROX 36 MIN AFTER A D.B.A.) THE LPSI PUMPS ARE SHUT DOWN AND THE HPSI PUMPS TAKE SUCTION FROM THE CONTAIMENT SUMP TO RECIRCULATE WATER THROUGH THE SYSTEM.
PWR Data Point Library Reference FileReport Date :Page :06-24-201523Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            23 Date:                             5/4/2015 Reactor Unit:                     CC1 Data Feeder:                     CCll NRC ERDS Parameter:               CTMNT SMP WR Point ID:                         1SP4112 Plant Specific Point


== Description:==
== Description:==
Generic / Condition
CNTMT LEVEL Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
CONTAINMENT SUMP WIDE RNG LEVEL Analog I Digital:                 A ENGR Units I Digital States:       INCHES ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:         120 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                  N/A Alarm / Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllCTMNT SMP WR1SP4112CNTMT LEVELCONTAINMENT SUMP WIDE RNG LEVELAINCHESN/A0120N/AN/AP2AVG OF TWO CHANNELSN/AN/AN/AN/AN/AN/AN/ATHE CONTAINMENT EMERGENCY SUMP PROVIDES ADEQUATE NPSH TOBOTH HPSI AND CONTAINMENT SPRAY PUMPS WHEN IN THERECIRCULATION MODE. "TWO 24" DIAMETER RECIRC LINES SUPPLYWATER TO THE CONTAINMENT SPRAY AND SAFETY INJECTION SYSTEM.THE SUMP IS COVERED WITH A METAL GRATING TO PREVENT DEBRISFROM ENTERING THE SUMP.
THE CONTAINMENT EMERGENCY SUMP PROVIDES ADEQUATE NPSH TO BOTH HPSI AND CONTAINMENT SPRAY PUMPS WHEN IN THE RECIRCULATION MODE. "TWO24" DIAMETER RECIRC LINES SUPPLY WATER TO THE CONTAINMENT SPRAY AND SAFETY INJECTION SYSTEM.
PWR Data Point Library Reference FileReport Date :Page :06-24-201524Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
THE SUMP IS COVERED WITH A METAL GRATING TO PREVENT DEBRIS FROM ENTERING THE SUMP.
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            24 Date:                             5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               EFF GAS RAD Point ID:                         1R5415!
Plant Specific Point


== Description:==
== Description:==
Generic I Condition
WR EFF MONITOR Generic I Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
RADIOACTIVITY OF RELEASED GASSES Analog / Digital:                 A ENGR Units I Digital States:       UCI/SEC ENGR Units Conversion:             N/A Minimum Instrument Range:         1 El Maximum Instrument Range:         1El13 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     S Number of Sensors:                 1 How Processed:                     INVERSE LOG OF INSTRUMENT VALUE Sensor Locations                  N/A Alarm / Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllEFF GAS RAD1R5415!WR EFF MONITORRADIOACTIVITY OF RELEASED GASSESAUCI/SECN/A1 El1El13N/AN/AS1INVERSE LOG OF INSTRUMENT VALUEN/AN/AN/AN/AN/AN/AN/ATHE EFFLUENT GAS RADIATION MONITOR MEASURES MAIN VENT STACKEFFLUENT GROSS ACTIVITY. 3 CHANNELS: LOW, MEDIUM, & HIGH AREUSED TO PROVIDE AN OUTPUT TO A FOURTH PSEUDO CHANNEL. THERANGE OF ACTIVITY DETECTED DETERMINES WHICH CHANNEL (L,M,H) ISSELECTED. THE OUTPUT OF THE FOURTH CHANNEL COMBINES GASIOUSFLOW WITH THE MEASURED ACTIVITY TO PROVIDE THE EFFECTIVEEFFLUENT GROSS ACTIVITY.
THE EFFLUENT GAS RADIATION MONITOR MEASURES MAIN VENT STACK EFFLUENT GROSS ACTIVITY. 3 CHANNELS: LOW, MEDIUM, & HIGH ARE USED TO PROVIDE AN OUTPUT TO A FOURTH PSEUDO CHANNEL. THE RANGE OF ACTIVITY DETECTED DETERMINES WHICH CHANNEL (L,M,H) IS SELECTED. THE OUTPUT OF THE FOURTH CHANNEL COMBINES GASIOUS FLOW WITH THE MEASURED ACTIVITY TO PROVIDE THE EFFECTIVE EFFLUENT GROSS ACTIVITY.
PWR Data Point Library Reference FileReport Date :Page :06-24-201525Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            25 Date:                             5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               EFF LIQ RAD Point ID:                         1SP6120 Plant Specific Point


== Description:==
== Description:==
Generic / Condition
LIQUID WASTE RAD Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
RADIOACTIVITY OF RELEASED LIQUID Analog I Digital:                 A ENGR Units / Digital States:       CPM ENGR Units Conversion:             N/A Minimum Instrument Range:         1E1 Maximum Instrument Range:         1E6 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 3 How Processed:                     INVERSE LOG OF INSTRUMENT VALUE Sensor Locations                  N/A Alarm / Trip Setpoints:           X >= 4.21 E5 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllEFF LIQ RAD1SP6120LIQUID WASTE RADRADIOACTIVITY OF RELEASED LIQUIDACPMN/A1E11E6N/AN/AP3INVERSE LOG OF INSTRUMENT VALUEN/AX >= 4.21 E5N/AN/AN/AN/AN/ALIQUID WASTE PROCESSING MONITORS THE COMMON DISCHARGEHEADER FROM REACTOR COOLANT WASTE PROCESSING AND MISCWASTE PROCESS. 50000 CPM WILL AUTOMATICALLY CLOSE 2DISCHARGE VALVES 0-CV-2201 & 0-CV-2202 TO ISOLATE FLOW TO THECIRCULATION WATER DISCHARGE CONDUITS. ALARM LIMIT GIVEN INALARM/TRIP SET POINT IS THE SPDS ALARM LIMIT.
LIQUID WASTE PROCESSING MONITORS THE COMMON DISCHARGE HEADER FROM REACTOR COOLANT WASTE PROCESSING AND MISC WASTE PROCESS. 50000 CPM WILL AUTOMATICALLY CLOSE 2 DISCHARGE VALVES 0-CV-2201 &0-CV-2202 TO ISOLATE FLOW TO THE CIRCULATION WATER DISCHARGE CONDUITS. ALARM LIMIT GIVEN IN ALARM/TRIP SET POINT IS THE SPDS ALARM LIMIT.
PWR Data Point Library Reference FileReport Date :Page :06-24-201526Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :              26 Date:                             5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               COND A/E RAD Point ID:                         1SP6117 Plant Specific Point


== Description:==
== Description:==
Generic I Condition
OFF GAS RAD Generic I Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
CONDENSER AIR EJECTOR RADIOACTIV Analog / Digital:                 A ENGR Units / Digital States:       GPD ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:         250 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 4 How Processed:                     REFERENCE UNIQUE SYSTEM DESCRIPTION Sensor Locations                  N/A Alarm / Trip Setpoints:           X >= 5 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllCOND A/E RAD1SP6117OFF GAS RADCONDENSER AIR EJECTOR RADIOACTIVAGPDN/A0250N/AN/AP4REFERENCE UNIQUE SYSTEM DESCRIPTIONN/AX >= 5N/AN/AN/AN/AN/ATHE CONDENSER AIR EJECTOR DISCHARGE MONITOR INCLUDES FOURRADIATION SENSORS. ONE SENSOR IS INSTALLED IN THE SUCTION SIDEOF EACH OF THE FOUR CONDENSER AIR REMOVAL PUMPS. OUTPUTSIGNALS ARE DISPLAYED IN THE CONTROL ROOM. THE AUCTIONEEREDHIGH SIGNAL IS CONVERTED FROM CPM TO GALLONS PER DAY (GPD)AND IS USED AS AN EARLY INDICATION OF A PRIMARY TO SECONDARYLEAK THROUGH THE S/G TUBES.
THE CONDENSER AIR EJECTOR DISCHARGE MONITOR INCLUDES FOUR RADIATION SENSORS. ONE SENSOR IS INSTALLED IN THE SUCTION SIDE OF EACH OF THE FOUR CONDENSER AIR REMOVAL PUMPS. OUTPUT SIGNALS ARE DISPLAYED IN THE CONTROL ROOM. THE AUCTIONEERED HIGH SIGNAL IS CONVERTED FROM CPM TO GALLONS PER DAY (GPD)
PWR Data Point Library Reference FileReport Date :Page :06-24-201527Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Paint ID:Plant Specific Point
AND IS USED AS AN EARLY INDICATION OF A PRIMARY TO SECONDARY LEAK THROUGH THE S/G TUBES.
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :             27 Date:                              5/4/2015 Reactor Unit:
CCll Data Feeder:
NRC ERDS Parameter:                 CNTMNT RAD Paint ID:                         1 SP6121 Plant Specific Point


== Description:==
== Description:==
Generic I Condition
CNTMT RAD Generic I Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
RADIATION LEVEL IN CONTAINMENT Analog I Digital:                   A ENGR Units I Digital States:       R/HR ENGR Units Conversion:             N/A Minimum Instrument Range:           1 Maximum Instrument Range:           1 E8 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
              "N/A Reference Point Notes              N/A Proc or Sens:                       P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                    N/A Alarm I Trip Setpoints:             X  >= 6 NI Detector Power Supply Cut-Off Power Level:         N/A NI Detector Power Supply Turn-on Power Level:         N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CCllCNTMNT RAD1 SP6121CNTMT RADRADIATION LEVEL IN CONTAINMENTAR/HRN/A11 E8"N/AN/AP2AVG OF TWO CHANNELSN/AX >= 6N/AN/AN/AN/AN/ATHESE CONTAINMENT RADIATION MONITORS MEASURE GAMMARADIATION LEVELS IN CONTAINMENT UNDER ACCIDENT CONDITIONS.THE DETECTORS ARE LOCATED AT THE 73-FOOT LEVEL AND AREPLACED NEAR THE PRESSURIZER AND #11 STEAM GEN.
THESE CONTAINMENT RADIATION MONITORS MEASURE GAMMA RADIATION LEVELS IN CONTAINMENT UNDER ACCIDENT CONDITIONS.
PWR Data Point Library Reference FileReport Date :Page :06-24-201528Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
THE DETECTORS ARE LOCATED AT THE 73-FOOT LEVEL AND ARE PLACED NEAR THE PRESSURIZER AND #11 STEAM GEN.
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :           28 Date:                              5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               RCS LTDN RAD Point ID:                         1 R5202!
Plant Specific Point


== Description:==
== Description:==
Generic / Condition
PROCESS RAD MONITOR Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
RAD LEVEL OF RCS LETDOWN LINE Analog I Digital:                 A ENGR Units / Digital States:       CPM ENGR Units Conversion:             N/A Minimum Instrument Range:         1E1 Maximum Instrument Range:         1 E6 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     S Number of Sensors:                 1 How Processed:                     INVERSE LOG OF INSTRUMENT VALUE Sensor Locations                  N/A Alarm I Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllRCS LTDN RAD1 R5202!PROCESS RAD MONITORRAD LEVEL OF RCS LETDOWN LINEACPMN/A1E11 E6N/AN/AS1INVERSE LOG OF INSTRUMENT VALUEN/AN/AN/AN/AN/AN/AN/ATHE CVCS LTDN RAD MONITOR IS INSTALLED IN THE LET DOWN LINE TOMONITOR GROSS REACTOR COOLANT ACTIVITY INDICATING APOTENTIAL FUEL ELEMENT FAILURE.
THE CVCS LTDN RAD MONITOR IS INSTALLED IN THE LET DOWN LINE TO MONITOR GROSS REACTOR COOLANT ACTIVITY INDICATING A POTENTIAL FUEL ELEMENT FAILURE.
PWR Data Point Library Reference FileReport Date : 06-24-2015Page : 29Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :   06-24-2015 Page :           29 Date:                             5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll1 NRC ERDS Parameter:                 MAIN SL I/A Point ID:                           1 R5421 !
Plant Specific Point


== Description:==
== Description:==
Generic / Condition
MAIN STM RAD LP 11 Generic / Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 11 STEAM LINE RAD LEVEL Analog / Digital:                 A ENGR Units / Digital States:       uCi/cc ENGR Units Conversion:             N/A Minimum Instrument Range:           I1E-2 Maximum Instrument Range:         I1E5 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     S Number of Sensors:                 1 How Processed:                     INVERSE LOG OF INSTRUMENT VALUE Sensor Locations                  N/A Alarm I Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCll1MAIN SL I/A1 R5421 !MAIN STM RAD LP 11STM GEN 11 STEAM LINE RAD LEVELAuCi/ccN/AI1E-2I1E5N/AN/AS1INVERSE LOG OF INSTRUMENT VALUEN/AN/AN/AN/AN/AN/AN/ATHE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FORNOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARELOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIVROOM.
THE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FOR NOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARE LOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIV ROOM.
PWR Data Point Library Reference FileReport Date :Page :06-24-201530Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :           30 Date:                              5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               MAIN SL 2/B Point ID:                         1 R5422!
Plant Specific Point


== Description:==
== Description:==
Generic I Condition
MAIN STM RAD LP 12 Generic I Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 12 STEAM LINE RAD LEVEL Analog I Digital:                   A ENGR Units I Digital States:       uCi/cc ENGR Units Conversion:             N/A Minimum Instrument Range:         1 E-2 Maximum Instrument Range:           1 E5 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                       S Number of Sensors:                 1 How Processed:                     INVERSE LOG OF INSTRUMENT VALUE Sensor Locations                    N/A Alarm I Trip Setpoints:             N/A NI Detector Power Supply Cut-Off Power Level:         N/A NI Detector Power Supply Turn-on Power Level:         N/A instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllMAIN SL 2/B1 R5422!MAIN STM RAD LP 12STM GEN 12 STEAM LINE RAD LEVELAuCi/ccN/A1 E-21 E5N/AN/AS1INVERSE LOG OF INSTRUMENT VALUEN/AN/AN/AN/AN/AN/AN/ATHE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FORNOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARELOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIVROOM.
THE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FOR NOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARE LOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIV ROOM.
PWR Data Point Library Reference FileReport Date :Page :06-24-201531Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :           31 Date:                              5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               SG BD RAD IA Point ID:                           iR4014!
Plant Specific Point


== Description:==
== Description:==
Generic / Condition
STM GEN BLOWDOWN ACTIVITY Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 11 BLOWDOWN RAD LEVEL Analog I Digital:                   A ENGR Units I Digital States:       CPM ENGR Units Conversion:             N/A Minimum Instrument Range:           1 El Maximum Instrument Range:           1 E6 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                       S Number of Sensors:                 1 How Processed:                     INVERSE LOG OF INSTRUMENT VALUE Sensor Locations                    N/A Alarm / Trip Setpoints:             X  >= 5E4 NI Detector Power Supply Cut-Off Power Level:         N/A NI Detector Power Supply Turn-on Power Level:         N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllSG BD RAD IAiR4014!STM GEN BLOWDOWN ACTIVITYSTM GEN 11 BLOWDOWN RAD LEVELACPMN/A1 El1 E6N/AN/AS1INVERSE LOG OF INSTRUMENT VALUEN/AX >= 5E4N/AN/AN/AN/AN/ATHIS DETECTOR MONITORS A SMALL PORTION OF THE STM GENBLOWDOWN TO PROVIDE OPERATORS WITH AN EARLY INDICATION OFSTM GEN U-TUBE LEAKAGE. ACTUATION OF THE HIGH ALARMAUTOMATICALLY SHUT THE SURFACE BLOWDOWN AND THE BOTT-IOMBLOWDOWN ISOLATION VALVES. OF BOTH #11 & #12 STEAMGENERATORS THIS MONITOR IS IN THE LINE OF THE BLOWDOWN TANKAND IS COMMON TO BOTH STM GEN.
THIS DETECTOR MONITORS A SMALL PORTION OF THE STM GEN BLOWDOWN TO PROVIDE OPERATORS WITH AN EARLY INDICATION OF STM GEN U-TUBE LEAKAGE. ACTUATION OF THE HIGH ALARM AUTOMATICALLY SHUT THE SURFACE BLOWDOWN AND THE BOTT-IOM BLOWDOWN ISOLATION VALVES. OF BOTH #11 &#12 STEAM GENERATORS THIS MONITOR IS INTHE LINE OF THE BLOWDOWN TANK AND IS COMMON TO BOTH STM GEN.
PWR Data Point Library Reference FileReport Date :Page :06-24-201532Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :       06-24-2015 Page :               32 Date:                              5/412015 Reactor Unit:                     CC1 Data Feeder:                       CC11 NRC ERDS Parameter:               CTMNT PRESS Point ID:                         1 SP41 10 Plant Specific Point


== Description:==
== Description:==
Generic I Condition
CNTMT PRESSURE Generic I Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
CONTAINMENT PRESSURE Analog / Digital:                 A ENGR Units / Digital States:       PSIG ENGR Units Conversion:             N/A Minimum Instrument Range:         -5 Maximum Instrument Range:         150 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 3 How Processed:                     AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)
Sensor Locations                  N/A Alarm I Trip Setpoints:           X >= 2.8 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/412015CC1CC11CTMNT PRESS1 SP41 10CNTMT PRESSURECONTAINMENT PRESSUREAPSIGN/A-5150N/AN/AP3AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)N/AX >= 2.8N/AN/AN/AN/AN/ATHERE ARE A TOTAL OF 3 CONTAINMENT PRESSURE INDICATORS. TWOPROVIDE WIDE RANGE PRESSURE INDICATION, -5 TO +150 AND 0 TO 150PSIG, FOR POST ACCIDENT MONITORING. THE THIRD INDICATOR IS ANARROW RANGE INDICATION -5 TO +5 PSIG WHICH PROVIDESCONTAINMENT DIFFERENTIAL PRESSURE. ACTUATIONS OCCUR: CIS @2.8 PSIG; CSAS @ 4.25 PSIG; SIAS @ 2.8 PSIG; RPS @ 2.4 PSIG.
THERE ARE A TOTAL OF 3 CONTAINMENT PRESSURE INDICATORS. TWO PROVIDE WIDE RANGE PRESSURE INDICATION, -5 TO +150 AND 0 TO 150 PSIG, FOR POST ACCIDENT MONITORING. THE THIRD INDICATOR IS A NARROW RANGE INDICATION -5 TO +5 PSIG WHICH PROVIDES CONTAINMENT DIFFERENTIAL PRESSURE. ACTUATIONS OCCUR: CIS @
PWR Data Point Library Reference FileReport Date :Page :06-24-201533Date:Reactor Unit:Data Feeder:NRC EROS Parameter:Point ID:Plant Specific Point
2.8 PSIG; CSAS @ 4.25 PSIG; SIAS @ 2.8 PSIG; RPS @ 2.4 PSIG.
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            33 Date:                             5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC EROS Parameter:               CTMNT TEMP Point ID:                         1SP4I111 Plant Specific Point


== Description:==
== Description:==
Generic I Condition
CNTMT TEMPERATURE Generic I Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
CONTAINMENT TEMPERATURE Analog I Digital:                 A ENGR Units / Digital States:       DEGF ENGR Units Conversion:             N/A Minimum Instrument Range:         50 Maximum Instrument Range:         300 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor OP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                  N/A Alarm / Trip Setpoints:           X >= 220 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for OP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllCTMNT TEMP1SP4I111CNTMT TEMPERATURECONTAINMENT TEMPERATUREADEGFN/A50300N/AN/AP2AVG OF TWO CHANNELSN/AX >= 220N/AN/AN/AN/AN/ATHERE ARE 2 CONTAINMENT TEMP DETECTORS. ONE MEASURES DOMETEMP, ANOTHER MEASURES THE REACTOR CAVITY TEMP. BOTH OFTHESE PROVIDE INDICATION TO THE CONTROL ROOM OPERATORS.
THERE ARE 2 CONTAINMENT TEMP DETECTORS. ONE MEASURES DOME TEMP, ANOTHER MEASURES THE REACTOR CAVITY TEMP. BOTH OF THESE PROVIDE INDICATION TO THE CONTROL ROOM OPERATORS.
PWR Data Point Library Reference FileReport Date :Page :06-24-201534Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :             34 Date:                              5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll1 NRC ERDS Parameter:               BWST LEVEL Point ID:                           1 SP2RWLVL Plant Specific Point


== Description:==
== Description:==
Generic / Condition
REFUELJNG WATER TANK LEVEL Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
BORATED WATER STORAGE TANK LEVEL Analog I Digital:                   A ENGR Units / Digital States:       FEET ENGR Units Conversion:             N/A Minimum Instrument Range:           0 Maximum Instrument Range:           40 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
TNKBOT Reference Point Notes              RE:USD (REFERENCE UNIQ SYS DESC)
Proc or Sens:                       P Number of Sensors:                 2 How Processed:                     WR SENSOR WHEN OUTSIDE NR SENSOR BAND Sensor Locations                    N/A Alarm I Trip Setpoints:             N/A NI Detector Power Supply Cut-Off Power Level:         N/A NI Detector Power Supply Turn-on Power Level:         N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               WET Unique System


== Description:==
== Description:==
5/4/2015CC1CCll1BWST LEVEL1 SP2RWLVLREFUELJNG WATER TANK LEVELBORATED WATER STORAGE TANK LEVELAFEETN/A040TNKBOTRE:USD (REFERENCE UNIQ SYS DESC)P2WR SENSOR WHEN OUTSIDE NR SENSOR BANDN/AN/AN/AN/AN/AN/AWETTHE REFUELING WATER TANK SUPPLIES 2300-2700 PPM BORATEDWATER TO THE SAFETY INJECTION SYSTEM AND ALSO SUPPLIES WATERFOR USE DURING REFUELING. TANK CAPACITY IS 420,000 GALS. AT 2.5FEET THE SAFETY INJECTION LINE-UP IS SWITCHED TO THERECIRCULATION MODE. THIS LEVEL IS EQUAL TO APPROX 10% OF TANKVOLUME.
THE REFUELING WATER TANK SUPPLIES 2300-2700 PPM BORATED WATER TO THE SAFETY INJECTION SYSTEM AND ALSO SUPPLIES WATER FOR USE DURING REFUELING. TANK CAPACITY IS 420,000 GALS. AT 2.5 FEET THE SAFETY INJECTION LINE-UP IS SWITCHED TO THE RECIRCULATION MODE. THIS LEVEL IS EQUAL TO APPROX 10% OF TANK VOLUME.
PWR Data Point Library Reference FileReport Date :Page :06-24-201535Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            35 Date:                             5/4/2015 Reactor Unit:                     CC1 Data Feeder:                     CCll NRC ERDS Parameter:               WIND SPEED Point ID:                         1WS60#15SM Plant Specific Point


== Description:==
== Description:==
Generic I Condition
WiND SPEED 60 METER 15 MINUTE AVG Generic I Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
WIND SPEED AT REACTOR SITE Analog I Digital:                 A ENGR Units I Digital States:       M/S ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:         50 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     S Number of Sensors:                 1 How Processed:                     N/A Sensor Locations                  N/A Alarm I Trip Setpoints:           X  >= 22 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           LOW Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllWIND SPEED1 WS60#15SMWiND SPEED 60 METER 15 MINUTE AVGWIND SPEED AT REACTOR SITEAM/SN/A050N/AN/AS1N/AN/AX >= 22N/AN/ALOWN/AN/AWIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTERIS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 60METER ELEVATION PWR Data Point Library Reference FileReport Date :Page :06-24-201536Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
WIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 60 METER ELEVATION
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :           36 Date:                              5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               WIND DIR Point ID:                           1WD60#15SM Plant Specific Point


== Description:==
== Description:==
Generic / Condition
WIND DIRECTION 60 METER 15 MINUTE AVG Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
WIND DIRECTION AT REACTOR SITE Analog I Digital:                   A ENGR Units I Digital States:       DEG ENGR Units Conversion:             N/A Minimum Instrument Range:           0 Maximum Instrument Range:           360 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                       S Number of Sensors:                 1 How Processed:                     N/A Sensor Locations                    N/A Alarm / Trip Setpoints:             N/A NI Detector Power Supply Cut-Off Power Level:         N/A NI Detector Power Supply Turn-on Power Level:         N/A Instrument Failure Mode:           0 DEGREES (NORTH)
Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllWIND DIR1WD60#15SMWIND DIRECTION 60 METER 15 MINUTE AVGWIND DIRECTION AT REACTOR SITEADEGN/A0360N/AN/AS1N/AN/AN/AN/AN/A0 DEGREES (NORTH)N/AN/AWIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THEPRIMARY MET TOWER ON SITE. 60 METER ELEVATION PWR Data Point Library Reference FileReport Date :Page :06-24-201537Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Paint
WIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER ON SITE. 60 METER ELEVATION
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            37 Date:                             5/4/2015 Reactor Unit:                     CCI Data Feeder:                     CCIl NRC ERDS Parameter:               WIND SPEED Point ID:                         1WS10#15M Plant Specific Paint


== Description:==
== Description:==
Generic I Condition
WIND SPEED 10 METER 15 MINUTE AVG Generic I Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum instrument Range:Maximum Instrument Range:Zero Point  
WIND SPEED AT REACTOR SITE Analog / Digital:                 A ENGR Units I Digital States:     M/S ENGR Units Conversion:             N/A Minimum instrument Range:         0 Maximum Instrument Range:         50 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     S Number of Sensors:                 1 How Processed:                     N/A Sensor Locations                  N/A Alarm I Trip Setpoints:           X >= 22 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           LOW Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CCICCIlWIND SPEED1WS10#15MWIND SPEED 10 METER 15 MINUTE AVGWIND SPEED AT REACTOR SITEAM/SN/A050N/AN/AS1N/AN/AX >= 22N/AN/ALOWN/AN/AWIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTERIS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 10METER ELEVATION PWR Data Point Library Reference FileReport Date :Page :06-24-201538Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
WIND SPEED INDICATION INMETERS PER SECOND TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 10 METER ELEVATION
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :             38 Date:                              5/4/2015 Reactor Unit:                     CCl Data Feeder:                       CCll NRC ERDS Parameter:               WIND DIR Point ID:                         1WD10#15M Plant Specific Point


== Description:==
== Description:==
Generic I Condition
WIND DIRECTION 10 METER 15 MINUTE AVG Generic I Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
WIND DIRECTION AT REACTOR SITE Analog I Digital:                 A ENGR Units I Digital States:       DEG ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:         360 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     S Number of Sensors:                 1 How Processed:                     N/A Sensor Locations                  N/A Alarm I Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           0 DEGREES (NORTH)
Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CClCCllWIND DIR1WD10#15MWIND DIRECTION 10 METER 15 MINUTE AVGWIND DIRECTION AT REACTOR SITEADEGN/A0360N/AN/AS1N/AN/AN/AN/AN/A0 DEGREES (NORTH)N/AN/AWIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THEPRIMARY MET TOWER ON SITE. 10 METER ELEVATION PWR Data Point Library Reference FileReport Date :Page :06-24-20 1539Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
WIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER ON SITE. 10 METER ELEVATION
 
PWR Data Point Library Reference File Report Date :           06-24-20 15 Page :                39 Date:                             5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               ATMOSPHERIC STABILITY Point ID:                         1MMS_DTASTB Plant Specific Point


== Description:==
== Description:==
WIND STABILITY BASED ON DELTA TEMP (A)
Generic / Condition
Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum instrument Range:Maximum Instrument Range:Zero Point  
AIR STABILITY AT REACTOR SITE Analog I Digital:                 A ENGR Units / Digital States:       N/A ENGR Units Conversion:             N/A Minimum instrument Range:         0 (A)
Maximum Instrument Range:         6 (G)
Zero Point  


==Reference:==
==Reference:==
Reference Paint NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Paint Notes              N/A Proc or Sens:                     P Number of Sensors:                 1 How Processed:                     COMPLEX Sensor Locations                  N/A Alarm I Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllATMOSPHERIC STABILITY1MMS_DTASTBWIND STABILITY BASED ON DELTA TEMP (A)AIR STABILITY AT REACTOR SITEAN/AN/A0 (A)6 (G)N/AN/AP1COMPLEXN/AN/AN/AN/AN/AN/AN/AATMOSPHERIC STABILITY BASED ON DELTA T (60 METER TEMPERATUREMINUS 10 METER TEMPERATURE, CHANNEL A). CALCULATED ON THEPLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITYCLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A,I=B, 2=C, 3=D, 4=E, 5=F, 6=G PWR Data Point Library Reference FileReport Date :Page :06-24-201540Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
ATMOSPHERIC STABILITY BASED ON DELTA T (60 METER TEMPERATURE MINUS 10 METER TEMPERATURE, CHANNEL A). CALCULATED ON THE PLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITY CLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A, I=B, 2=C, 3=D, 4=E, 5=F, 6=G
 
PWR Data Point Library Reference File Report Date :         06-24-2015 Page :                 40 Date:                              5/4/2015 Reactor Unit:                     CC1 Data Feeder:                       CCll NRC ERDS Parameter:               ATMOSPHERIC STABILITY Point ID:                         I MMSS6OSTB Plant Specific Point


== Description:==
== Description:==
Generic / Condition
60 METER WIND STABILITY - SIGMA-THETA Generic / Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
AIR STABILITY AT REACTOR SITE Analog / Digital:                 A ENGR Units I Digital States:       N/A ENGR Units Conversion:             N/A Minimum Instrument Range:         0 (A)
Maximum Instrument Range:         6 (G)
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 1 How Processed:                     COMPLEX Sensor Locations                  N/A Alarm I Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC1CCllATMOSPHERIC STABILITYI MMSS6OSTB60 METER WIND STABILITY -SIGMA-THETAAIR STABILITY AT REACTOR SITEAN/AN/A0 (A)6 (G)N/AN/AP1COMPLEXN/AN/AN/AN/AN/AN/AN/AATMOSPHERIC STABILITY BASED ON SIGMA-THETA. CALCULATED ONTHE PLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITYCLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A,1=B, 2=C, 3=D, 4=E, 5=F, 6=G PWR Data Point Library Reference FileReport Date :Page :06-24-20151Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
ATMOSPHERIC STABILITY BASED ON SIGMA-THETA. CALCULATED ON THE PLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITY CLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A, 1=B, 2=C, 3=D, 4=E, 5=F, 6=G
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :             1 Date:                              5/4/2015 Reactor Unit:                     002 Data Feeder:                       CC21 NRC ERDS Parameter:               NI POWER RNG Point ID:                         2SP1 109 Plant Specific Point


== Description:==
== Description:==
Generic I Condition
WIDE RANGE POWER Generic I Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
NUCLEAR INSTRUMENTS, POWER RANGE Analog / Digital:                 A ENGR Units I Digital States:
ENGR Units Conversion:             N/A Minimum Instrument Range:         1 E-8 Maximum Instrument Range:         2O00 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 4 How Processed:                     AVG OF THE TWO CLOSEST CHANNEL VALUES Sensor Locations                  N/A Alarm I Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015002CC21NI POWER RNG2SP1 109WIDE RANGE POWERNUCLEAR INSTRUMENTS, POWER RANGEAN/A1 E-82O00N/AN/AP4AVG OF THE TWO CLOSEST CHANNEL VALUESN/AN/AN/AN/AN/AN/AN/AWIDE RANGE NUCLEAR INSTRUMENTATION PROVIDES AN INDICATION OFREACTOR POWER AS A PERCENT OF REACTOR POWER. START UP RATEREACTOR TRIP IS GIVEN FROM WIDE RANGE NUCLEAR INSTRUMENTSBETWEEN THE RANGE OF 1E-4% TO 15% POWER. THESE DETECTORSARE FISSION CHAMBERS WHICH DO NOT GET DEENERGIZED DURINGNORMAL POWER OPERATIONS.
WIDE RANGE NUCLEAR INSTRUMENTATION PROVIDES AN INDICATION OF REACTOR POWER AS A PERCENT OF REACTOR POWER. START UP RATE REACTOR TRIP IS GIVEN FROM WIDE RANGE NUCLEAR INSTRUMENTS BETWEEN THE RANGE OF 1E-4% TO 15% POWER. THESE DETECTORS ARE FISSION CHAMBERS WHICH DO NOT GET DEENERGIZED DURING NORMAL POWER OPERATIONS.
PWR Data Point Library Reference FileReport Date :Page :06-24-20152Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :       06-24-2015 Page :              2 Date:                             5/4/2015 Reactor Unit:                     002 Data Feeder:                       0021 NRC ERDS Parameter:               REC VES LEV Point ID:                         2SP2112 Plant Specific Point


== Description:==
== Description:==
Generic / Condition
REACTOR VESSEL LEVEL Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
REACTOR VESSEL WATER LEVEL Analog I Digital:                   A ENGR Units I Digital States:       INCHES ENGR Units Conversion:             N/A Minimum Instrument Range:           N/A Maximum Instrument Range:           N/A Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
FAP Reference Point Notes              N/A Proc or Sens:                       P Number of Sensors:                 16 How Processed:                     RE:USD (REFERENCE UNIQUE SYS DESC)
Sensor Locations                    160,151,112,71,50,29,19, & 10" ABOVE FAP Alarm I Trip Setpoints:             VOID DETECTED NI Detector Power Supply Cut-Off Power Level:         N/A NI Detector Power Supply Turn-on Power Level:         N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/20150020021REC VES LEV2SP2112REACTOR VESSEL LEVELREACTOR VESSEL WATER LEVELAINCHESN/AN/AN/AFAPN/AP16RE:USD (REFERENCE UNIQUE SYS DESC)160,151,112,71,50,29,19, & 10" ABOVE FAPVOID DETECTEDN/AN/AN/AN/AN/A8 HEATED JUNCTION THERMOCOUPLES (HJTC) ARE SPACEDSTRATEGICALLY IN A VACANT CEA SHROUD ASSEMBLY NEAR THEVICINITY OF ONE HOT LEG OUTLET NOZZLE. AS HJTC IS UNCOVEREDTHE LVL THAT THE REACTOR HEAD IS UNCOVERED IS INDICATED ININCREMENTAL STEPS. THE 1ST HJTC IS 160" FROM TOP OF FUELALIGNMENT PLATE(FAP); 8TH HJTC IS 10" FROM FAP; 5TH HJTC IS 50"FROM FAP WHICH IS THE CENTER LINE OF THE HOT LEGS. HOWPROCESSED: WHEN LVL DECREASES A VOID IN THE HJTC WILL PROVIDEAN OUTPUT SIGNAL FOR THAT SPECIFIC HJTC POSITION.
8 HEATED JUNCTION THERMOCOUPLES (HJTC) ARE SPACED STRATEGICALLY IN A VACANT CEA SHROUD ASSEMBLY NEAR THE VICINITY OF ONE HOT LEG OUTLET NOZZLE. AS HJTC IS UNCOVERED THE LVL THAT THE REACTOR HEAD IS UNCOVERED IS INDICATED IN INCREMENTAL STEPS. THE 1ST HJTC IS 160" FROM TOP OF FUEL ALIGNMENT PLATE(FAP); 8TH HJTC IS 10" FROM FAP; 5TH HJTC IS 50" FROM FAP WHICH IS THE CENTER LINE OF THE HOT LEGS. HOW PROCESSED: WHEN LVL DECREASES A VOID IN THE HJTC WILL PROVIDE AN OUTPUT SIGNAL FOR THAT SPECIFIC HJTC POSITION.
PWR Data Point Library Reference FileReport Date:*Page :06-24-20153Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Paint ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date:*     06-24-2015 Page :            3 Date:                             5/4/2015 Reactor Unit:                     CC2 Data Feeder:                       CC21 NRC ERDS Parameter:               TEMP CORE EX Paint ID:                         2SP2113 Plant Specific Point


== Description:==
== Description:==
Generic I Condition
CORE EXIT TEMP Generic I Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
HIGHEST TEMP AT THE CORE EXIT Analog / Digital:                 A ENGR Units I Digital States:       DEG F ENGR Units Conversion:             N/A Minimum Instrument Range:         40 Maximum Instrument Range:         2300 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 35 How Processed:                     AVG EACH QUADRANT'S PTS:SHOW HIGH AVG Sensor Locations                  N/A Alarm / Trip Setpoints:           X >= 650 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC2CC21TEMP CORE EX2SP2113CORE EXIT TEMPHIGHEST TEMP AT THE CORE EXITADEG FN/A402300N/AN/AP35AVG EACH QUADRANT'S PTS:SHOW HIGH AVGN/AX >= 650N/AN/AN/AN/AN/ACORE EXIT THERMOCOUPLES ARE LOCATED AT THE TOP OF THEINCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN 35 SELECTEDFUEL ASSEMBLIES. THESE DETECTORS ARE DIVIDED INTO QUADRANTSAND EACH QUADRANT IS AVERAGED. THIS POINT IS THE HIGHESTQUADRANT AVG.
CORE EXIT THERMOCOUPLES ARE LOCATED AT THE TOP OF THE INCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN 35 SELECTED FUEL ASSEMBLIES. THESE DETECTORS ARE DIVIDED INTO QUADRANTS AND EACH QUADRANT IS AVERAGED. THIS POINT IS THE HIGHEST QUADRANT AVG.
PWR Data Point Library Reference FileReport Date :Page :06-24-20154Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :       06-24-2015 Page :              4 Date:                             5/4/2015 Reactor Unit:                     CC2 Data Feeder:                       0021 NRC ERDS Parameter:               SUB MARGIN Point ID:                         2SP3123 Plant Specific Point


== Description:==
== Description:==
Generic / Condition
CORE SUBCOOLED MARGIN Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
SATURATION TEMPERATURE-HIGH CET Analog I Digital:                   A ENGR Units / Digital States:       DEGF ENGR Units Conversion:             N/A Minimum Instrument Range:           N/A Maximum Instrument Range:           N/A Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                       P Number of Sensors:                 37 How Processed:                     RE: USD (REFERENCE UNIQUE SYS DESC)
Sensor Locations                    N/A Alarm / Trip Setpoints:             N/A NI Detector Power Supply Cut-Off Power Level:         N/A NI Detector Power Supply Turn-on Power Level:         N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC20021SUB MARGIN2SP3123CORE SUBCOOLED MARGINSATURATION TEMPERATURE-HIGH CETADEGFN/AN/AN/AN/AN/AP37RE: USD (REFERENCE UNIQUE SYS DESC)N/AN/AN/AN/AN/AN/AN/ACORE SUBCOOLED MARGIN IS CALCULATED BY THE SATURATIONTEMPERATURE AS DETERMINED FROM PRESSURIZER PRESSURE(SP3120) MINUS THE CORE EXIT TEMP (SP2113).
CORE SUBCOOLED MARGIN IS CALCULATED BY THE SATURATION TEMPERATURE AS DETERMINED FROM PRESSURIZER PRESSURE (SP3120) MINUS THE CORE EXIT TEMP (SP2113).
PWR Data Point Library Reference FileReport Date :Page :06-24-20155Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :   06-24-2015 Page :         5 Date:                              5/4/2015 Reactor Unit:                     002 Data Feeder:                       CC21 NRC ERDS Parameter:               CORE FLOW Point ID:                         2F131A Plant Specific Point


== Description:==
== Description:==
Generic / Condition
RCS TOTAL FLOW OH A Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum instrument Range:Maximum Instrument Range:Zero Point  
TOTAL REACTOR COOLANT FLOW Analog I Digital:                   A ENGR Units I Digital States:
ENGR Units Conversion:             100% RX COOLANT FLOW = 370,000 GPM Minimum instrument Range:         -54.35 Maximum Instrument Range:         153.68 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                       P Number of Sensors:                 2 How Processed:                     N/A Sensor Locations                    N/A Alarm I Trip Setpoints:             N/A NI Detector Power Supply Cut-Off Power Level:         N/A NI Detector Power Supply Turn-on Power Level:         N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015002CC21CORE FLOW2F131ARCS TOTAL FLOW OH ATOTAL REACTOR COOLANT FLOWA100% RX COOLANT FLOW = 370,000 GPM-54.35153.68N/AN/AP2N/AN/AN/AN/AN/AN/AN/AN/AREACTOR COOLANT FLOW IS DETERMINED BY THE 0/P ACROSS THESTEAM GENERATORS. WHERE TOTAL FLOW IS THE SUM OF BOTH LOOPFLOWS.
REACTOR COOLANT FLOW IS DETERMINED BY THE 0/P ACROSS THE STEAM GENERATORS. WHERE TOTAL FLOW IS THE SUM OF BOTH LOOP FLOWS.
PWR Data Point Library Reference FileReport Date :Page :06-24-20156Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            6 Date:                             5/4/2015 Reactor Unit:                     CC2 Data Feeder:                       CC21 NRC ERDS Parameter:               SG LEVEL 1/A Point ID:                         2SP3I17A Plant Specific Point


== Description:==
== Description:==
Generic I Condition
SG LEVEL LOOP 21 Generic I Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STEAM GENERATOR 21 WATER LEVEL Analog I Digital:                   A ENGR Units I Digital States:       INCHES ENGR Units Conversion:             N/A Minimum Instrument Range:         -401.0 Maximum Instrument Range:         63.5 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              0" = 40' ABOVE THE FEED RING Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                    N/A Alarm / Trip Setpoints:             X>=50    X<=-170 NI Detector Power Supply Cut-Off Power Level:         N/A NI Detector Power Supply Turn-on Power Level:         N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               WET Unique System


== Description:==
== Description:==
5/4/2015CC2CC21SG LEVEL 1/A2SP3I17ASG LEVEL LOOP 21STEAM GENERATOR 21 WATER LEVELAINCHESN/A-401.063.5N/A0" = 40' ABOVE THE FEED RINGP2AVG OF TWO CHANNELSN/AX>=50 X<=-170N/AN/AN/AN/AWETA LOW LEVEL REACTOR TRIP OCCURS AT -50" AS READ ON THE NARROWRANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170" AS READ ONTHE WIDE RANGE S/G LVL DETECTOR. POINT ID SP3117A IS A WIDERANGE LVL INDICATOR.
A LOW LEVEL REACTOR TRIP OCCURS AT -50" AS READ ON THE NARROW RANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170" AS READ ON THE WIDE RANGE S/G LVL DETECTOR. POINT ID SP3117A IS A WIDE RANGE LVL INDICATOR.
PWR Data Point Library Reference FileReport Date :Page :06-24-20157Date:Reactor Unit:Data Feeder:NRC EROS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :           7 Date:                              5/4/2015 Reactor Unit:                     CC2 Data Feeder:                       CC21 NRC EROS Parameter:               SG LEVEL 2/B Point ID:                         2SP3117B Plant Specific Point


== Description:==
== Description:==
Generic / Condition
SG LEVEL LOOP 22 Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STEAM GENERATOR 22 WATER LEVEL Analog I Digital:                 A ENGR Units I Digital States:       INCHES ENGR Units Conversion:             N/A Minimum Instrument Range:         -401.0 Maximum Instrument Range:         63.5 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              0" = 40' ABOVE THE FEED RING Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                  N/A Alarm I Trip Setpoints:           X>=50    X<z=-170 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               WET Unique System


== Description:==
== Description:==
5/4/2015CC2CC21SG LEVEL 2/B2SP3117BSG LEVEL LOOP 22STEAM GENERATOR 22 WATER LEVELAINCHESN/A-401.063.5N/A0" = 40' ABOVE THE FEED RINGP2AVG OF TWO CHANNELSN/AX>=50 X<z=-170N/AN/AN/AN/AWETA LOW LEVEL REACTOR TRIP OCCURS AT -50' AS READ ON THE NARROWRANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170" AS READ ONTHE WIDE RANGE S/G LVL DETECTOR. POINT ID 5P3117B IS A WIDERANGE LVL INDICATOR.
A LOW LEVEL REACTOR TRIP OCCURS AT -50' AS READ ON THE NARROW RANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170" AS READ ON THE WIDE RANGE S/G LVL DETECTOR. POINT ID 5P3117B IS A WIDE RANGE LVL INDICATOR.
PWR Data Point Library Reference FileReport Date :Page :06-24-20158Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :           8 Date:                            5/4/2015 Reactor Unit:                     CC2 Data Feeder:                       CC21 NRC ERDS Parameter:               SG PRESS 1/A Point ID:                         2SP3116A Plant Specific Point


== Description:==
== Description:==
Generic / Condition
SG PRESSURE LOOP 21 Generic / Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum instrument Range:Maximum Instrument Range:Zero Point  
STEAM GENERATOR 21 PRESSURE Analog / Digital:                 A ENGR Units I Digital States:       PSIA ENGR Units Conversion:             N/A Minimum instrument Range:         0 Maximum Instrument Range:         1200 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:Ni Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Tem perature Comnpensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                  N/A Alarm I Trip Setpoints:           X>=950    X<=703 NI Detector Power Supply Cut-Off Power Level:       N/A Ni Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Tem perature Comnpensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC2CC21SG PRESS 1/A2SP3116ASG PRESSURE LOOP 21STEAM GENERATOR 21 PRESSUREAPSIAN/A01200N/AN/AP2AVG OF TWO CHANNELSN/AX>=950 X<=703N/AN/AN/AN/AN/AREACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEATEXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LINE RUPTURE ORCOMP FAILURE.
REACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEAT EXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LINE RUPTURE OR COMP FAILURE.
PWR Data Point Library Reference FimeReport Date :Page :06-24-20159Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference Fime Report Date :   06-24-2015 Page :           9 Date:                            5/4/2015 Reactor Unit:                     C02 Data Feeder:                     0021 NRC ERDS Parameter:               SG PRESS 2/B Point ID:                         2SP3116B Plant Specific Point


== Description:==
== Description:==
Generic / Condition
SG PRESSURE LOOP 22 Generic / Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STEAM GENERATOR 22 PRESSURE Analog / Digital:                 A ENGR Units / Digital States:       PSIA ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:         1200 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                  N/A Alarm / Trip Setpoints:           X>=950    X<=703 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015C020021SG PRESS 2/B2SP3116BSG PRESSURE LOOP 22STEAM GENERATOR 22 PRESSUREAPSIAN/A01200N/AN/AP2AVG OF TWO CHANNELSN/AX>=950 X<=703N/AN/AN/AN/AN/AREACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEATEXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LINE RUPTURE OFCOMP FAILURE.
REACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEAT EXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LINE RUPTURE OF COMP FAILURE.
PWR Data Point Library Reference FileReport Date :Page :06-24-201510Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :              10 Date:                             5/4/2015 Reactor Unit:                     CC2 Data Feeder:                       0021 NRC ERDS Parameter:               MN ED FL 1/A Point ID:                         2F1111%
Plant Specific Point


== Description:==
== Description:==
Generic I Condition
FW FLOW TO STEAM GEN. 21 Generic I Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 21 MAIN FEEDWATER FLOW Analog I Digital:                 A ENGR Units I Digital States:       KLB/HR ENGR Units Conversion:             N/A Minimum Instrument Range:         N/A Maximum Instrument Range:         N/A Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 8 How Processed:                     COMPLEX Sensor Locations                  N/A Alarm I Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               Y Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC20021MN ED FL 1/A2F1111%FW FLOW TO STEAM GEN. 21STM GEN 21 MAIN FEEDWATER FLOWAKLB/HRN/AN/AN/AN/AN/AP8COMPLEXN/AN/AN/AN/AN/AYN/ATHIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVENMAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATEREXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEEDREG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONEDTO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARERUNNING.
THIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVEN MAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATER EXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEED REG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONED TO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARE RUNNING.
PWR Data Point Library Reference FileReport Date :Page :06-24-201511Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            11 Date:                             5/4/2015 Reactor Unit:                     002 Data Feeder:                       0021 NRC ERDS Parameter:               MN FD FL 2/B Point ID:                         2F1121%
Plant Specific Point


== Description:==
== Description:==
Generic / Condition
FW FLOW TO STEAM GEN. 22 Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 22 MAIN FEEDWATER FLOW Analog I Digital:                 A ENGR Units I Digital States:       KLB/HR ENGR Units Conversion:             N/A Minimum Instrument Range:         N/A Maximum Instrument Range:         N/A Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:instrument Failure Mode:Temperature Compensationfor OP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 8 How Processed:                     COMPLEX Sensor Locations                  N/A Alarm / Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A instrument Failure Mode:           N/A Temperature Compensation for OP Transmitters:               Y Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/20150020021MN FD FL 2/B2F1121%FW FLOW TO STEAM GEN. 22STM GEN 22 MAIN FEEDWATER FLOWAKLB/HRN/AN/AN/AN/AN/AP8COMPLEXN/AN/AN/AN/AN/AYN/ATHIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVENMAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATEREXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEEDREG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONEDTO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARERUNNING.
THIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVEN MAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATER EXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEED REG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONED TO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARE RUNNING.
PWR Data Point Library Reference FileReport Date :Page :06-24-201512Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            12 Date:                             5/4/2015 Reactor Unit:                     002 Data Feeder:                       0021 NRC ERDS Parameter:               AX FD FL 1/A Point ID:                         2SP311 8A Plant Specific Point


== Description:==
== Description:==
Generic / Condition
AUX FEED FLOW LOOP 21 Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 21 AUXILIARY FW FLOW Analog I Digital:                   A ENGR Units / Digital States:       GPM ENGR Units Conversion:             N/A Minimum Instrument Range:           0 Maximum Instrument Range:           1250 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                       P Number of Sensors:                 2 How Processed:                     SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCH Sensor Locations                    N/A Alarm / Trip Setpoints:             N/A NI Detector Power Supply Cut-Off Power Level:         N/A NI Detector Power Supply Turn-on Power Level:         N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/20150020021AX FD FL 1/A2SP311 8AAUX FEED FLOW LOOP 21STM GEN 21 AUXILIARY FW FLOWAGPMN/A01250N/AN/AP2SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCHN/AN/AN/AN/AN/ANN/ATHERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRICDRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMONHEADER FOR BOTH #21 & #22 STM GENS. THE MOTOR DRIVEN PUMPDISCHARGES TO A SEPARATE HEADER FOR BOTH #21 & #22 STM GENS.BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOREACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM#12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP ISNORMALLY ALIGNED TO START.
THERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRIC DRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMON HEADER FOR BOTH #21 &#22 STM GENS. THE MOTOR DRIVEN PUMP DISCHARGES TO A SEPARATE HEADER FOR BOTH #21 & #22 STM GENS.
PWR Data Point Library Reference FileReport Date :Page :06-24-201513Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOR EACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM
                                    #12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP IS NORMALLY ALIGNED TO START.
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            13 Date:                             5/4/2015 Reactor Unit:                     CC2 Data Feeder:                     CC21 NRC ERDS Parameter:               AX FD FL 2/B Point ID:                         2SP3118B Plant Specific Point


== Description:==
== Description:==
Generic / Condition
AUX FEED FLOW LOOP 22 Generic / Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 22 AUXILIARY FW FLOW Analog / Digital:                 A ENGR Units / Digital States:       GPM ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:         1250 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCH Sensor Locations                  N/A Alarm / Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC2CC21AX FD FL 2/B2SP3118BAUX FEED FLOW LOOP 22STM GEN 22 AUXILIARY FW FLOWAGPMN/A01250N/AN/AP2SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCHN/AN/AN/AN/AN/ANN/ATHERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRICDRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMONHEADER FOR BOTH #21 & #22 STM GENS. THE MOTOR DRIVEN PUMPDISCHARGES TO A SEPARATE HEADER FOR BOTH #21 & #22 STM GENS.BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOREACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM#12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP ISNORMALLY ALIGNED TO START.
THERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRIC DRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMON HEADER FOR BOTH #21 & #22 STM GENS. THE MOTOR DRIVEN PUMP DISCHARGES TO A SEPARATE HEADER FOR BOTH #21 & #22 STM GENS.
PWR Data Point Library Reference FileReport Date :Page :06-24-201514Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOR EACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM
                                  #12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP IS NORMALLY ALIGNED TO START.
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :           14 Date:                              5/4/2015 Reactor Unit:                     CC2 Data Feeder:                       CC21 NRC ERDS Parameter:               HL TEMP 1/A Point ID:                         2SP0106A Plant Specific Point


== Description:==
== Description:==
Generic / Condition
THOT LOOP 21 Generic / Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum instrument Range:Maximum instrument Range:Zero Point  
STM GEN 21 INLET TEMPERATURE Analog / Digital:                   A ENGR Units I Digital States:       0DEG F ENGR Units Conversion:             N/A Minimum instrument Range:           50 Maximum instrument Range:           700 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm /Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                       P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                    N/A Alarm /Trip Setpoints:             N/A NI Detector Power Supply Cut-Off Power Level:         N/A NI Detector Power Supply Turn-on Power Level:         N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC2CC21HL TEMP 1/A2SP0106ATHOT LOOP 21STM GEN 21 INLET TEMPERATUREA0DEG FN/A50700N/AN/AP2AVG OF TWO CHANNELSN/AN/AN/AN/AN/AN/AN/ATHOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THESTEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGINMONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUITFOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTIONSYSTEM.
THOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THE STEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUIT FOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM.
PWR Data Point Library Reference FileReport Date :Page :06-24-201515Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            15 Date:                             5/4/2015 Reactor Unit:                     002 Data Feeder:                       CC21 NRC ERDS Parameter:               HL TEMP 2/B Point ID:                         2SP0106B Plant Specific Point


== Description:==
== Description:==
Generic / Condition
THOT LOOP 22 Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 22 INLET TEMPERATURE Analog I Digital:                 A ENGR Units I Digital States:       DEGF ENGR Units Conversion:             N/A Minimum Instrument Range:         50 Maximum Instrument Range:         700 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                  N/A Alarm / Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015002CC21HL TEMP 2/B2SP0106BTHOT LOOP 22STM GEN 22 INLET TEMPERATUREADEGFN/A50700N/AN/AP2AVG OF TWO CHANNELSN/AN/AN/AN/AN/AN/AN/ATHOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THESTEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGINMONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUITFOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTIONSYSTEM.
THOT ISTHE COOLANT TEMPERATURE MEASURED AT THE INLET TO THE STEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUIT FOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM.
PWR Data Point Library Reference FileReport Date :Page :06-24-201516Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :             16 Date:                              5/4/2015 Reactor Unit:                     CC2 Data Feeder:                       0021 NRC ERDS Parameter:               CL TEMP 1/A Point ID:                         2SP3113A Plant Specific Point


== Description:==
== Description:==
Generic / Condition
TCOLD LOOP 21 Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 21 OUTLET TEMPERATURE Analog I Digital:                 A ENGR Units I Digital States:       DEGF ENGR Units Conversion:             N/A Minimum Instrument Range:         50 Maximum Instrument Range:         700 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 3 How Processed:                     AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)
Sensor Locations                  N/A Alarm I Trip Setpoints:           X>=560 X<=525 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC20021CL TEMP 1/A2SP3113ATCOLD LOOP 21STM GEN 21 OUTLET TEMPERATUREADEGFN/A50700N/AN/AP3AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)N/AX>=560 X<=525N/AN/AN/AN/AN/ATHE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SETPOINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANELINDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLEDMARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP)CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTORPROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TOBE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.
THE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SET POINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANEL INDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP)
PWR Data Point Library Reference FileReport Date :Page :06-24-201517Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TO BE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :             17 Date:                              5/4/2015 Reactor Unit:                     002 Data Feeder:                       0021 NRC ERDS Parameter:               CL TEMP 2/B Point ID:                         2SP311 3B Plant Specific Point


== Description:==
== Description:==
Generic / Condition
TCOLD LOOP 22 Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 22 OUTLET TEMPERATURE Analog I Digital:                 A ENGR Units I Digital States:       DEGF ENGR Units Conversion:             N/A Minimum Instrument Range:         50 Maximum Instrument Range:         700 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 3 How Processed:                     AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)
Sensor Locations                  N/A Alarm I Trip Setpoints:           X>=560    X<=525 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/20150020021CL TEMP 2/B2SP311 3BTCOLD LOOP 22STM GEN 22 OUTLET TEMPERATUREADEGFN/A50700N/AN/AP3AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)N/AX>=560 X<=525N/AN/AN/AN/AN/ATHE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SETPOINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANELINDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLEDMARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP)CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTORPROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TOBE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.
THE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SET POINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANEL INDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP)
PWR Data Point Library Reference FileReport Date :Page :06-24-201518Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
CIRCUIT FOR TOTAL POWER CALCULATION INTHE REACTOR PROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TO BE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.
 
PWR Data Point Library Reference File Report Date :       06-24-2015 Page :             18 Date:                            5/4/2015 Reactor Unit:                     002 Data Feeder:                     CC21 NRC ERDS Parameter:               RCS PRESSURE Point ID:                         2SP3120 Plant Specific Point


== Description:==
== Description:==
Generic / Condition
PRESSURIZER PRESSURE Generic / Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
REACTOR COOLANT SYSTEM PRESSURE Analog / Digital:                 A ENGR Units I Digital States:       PSIA ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:         4000 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                  N/A Alarm / Trip Setpoints:           X >= 2400 X.<= 1740 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015002CC21RCS PRESSURE2SP3120PRESSURIZER PRESSUREREACTOR COOLANT SYSTEM PRESSUREAPSIAN/A04000N/AN/AP2AVG OF TWO CHANNELSN/AX >= 2400 X.<= 1740N/AN/AN/AN/AN/AREACTOR COOLANT PRESSURE IS THE AVERAGE OF 2 WIDE RANGEPRESSURIZER PRESSURE DETECTORS. THE SAFETY VALVES ARE SETTO OPEN AT 2500#. HIGH PRESSURE REACTOR TRIP OCCURS AT 2400#.PORVS OPEN AT 2400 PSIA ON A REACTOR TRIP FROM HIGH PRESSURE.SPRAY VALVE SETPOINT IS DEPENDENT ON CONTROLLER SETPOINT.BOTH SPRAY VALVES CLOSE AT 2300 PSIA. ESFAS ACTUATION ISINITIATED AT 1740#.
REACTOR COOLANT PRESSURE ISTHE AVERAGE OF 2 WIDE RANGE PRESSURIZER PRESSURE DETECTORS. THE SAFETY VALVES ARE SET TO OPEN AT 2500#. HIGH PRESSURE REACTOR TRIP OCCURS AT 2400#.
PWR Data Point Library Reference FileReport Date :Page :06-24-201519Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
PORVS OPEN AT 2400 PSIA ON A REACTOR TRIP FROM HIGH PRESSURE.
SPRAY VALVE SETPOINT IS DEPENDENT ON CONTROLLER SETPOINT.
BOTH SPRAY VALVES CLOSE AT 2300 PSIA. ESFAS ACTUATION IS INITIATED AT 1740#.
 
PWR Data Point Library Reference File Report Date :       06-24-2015 Page :              19 Date:                             5/4/2015 Reactor Unit:                     002 Data Feeder:                       CC21 NRC ERDS Parameter:                 PRZR LEVEL Point ID:                         2SP2109 Plant Specific Point


== Description:==
== Description:==
Generic / Condition
PRESSURIZER LEVEL Generic / Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
PRIMARY SYSTEM PRESSURIZER LEVEL Analog / Digital:                   A ENGR Units / Digital States:       INCHES ENGR Units Conversion:             N/A Minimum Instrument Range:           0 Maximum Instrument Range:           360 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
RE: USD Reference Point Notes              N/A Proc or Sens:                       P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                    N/A Alarm / Trip Setpoints:             X>=305    X<=50 NI Detector Power Supply Cut-Off Power Level:         N/A NI Detector Power Supply Turn-on Power Level:         N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               WET Unique System


== Description:==
== Description:==
5/4/2015002CC21PRZR LEVEL2SP2109PRESSURIZER LEVELPRIMARY SYSTEM PRESSURIZER LEVELAINCHESN/A0360RE: USDN/AP2AVG OF TWO CHANNELSN/AX>=305 X<=50N/AN/AN/AN/AWETPRESSURIZER LEVEL IS NORMALLY CONTROLLED IN A BAND BETWEEN160" TO 216" DURING NORMAL POWER OPERATIONS. PRESSURIZERHEATERS CUTOUT AT A LEVEL OF 101" IN THE PRESSURIZER.PRESSURIZER HEATERS WILL START TO BE UNCOVERED AT APPROX 84'OF INDICATED LEVEL. ZERO REFERENCE POINT: BOTTOM OFPRESSURIZER.
PRESSURIZER LEVEL IS NORMALLY CONTROLLED IN A BAND BETWEEN 160" TO 216" DURING NORMAL POWER OPERATIONS. PRESSURIZER HEATERS CUTOUT AT A LEVEL OF 101" IN THE PRESSURIZER.
PWR Data Point Library Reference FileReport Date :Page :06-24-201520Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
PRESSURIZER HEATERS WILL START TO BE UNCOVERED AT APPROX 84' OF INDICATED LEVEL. ZERO REFERENCE POINT: BOTTOM OF PRESSURIZER.
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            20 Date:                             5/4/2015 Reactor Unit:                     CC2 Data Feeder:                       CC21 NRC ERDS Parameter:               RCS CHG/MU Point ID:                         2SPl114 Plant Specific Point


== Description:==
== Description:==
Generic / Condition
CHG PUMP FLOW Generic / Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum instrument Range:Zero Point  
PRIMARY SYSTEM CHARGING/MAKEUP F Analog / Digital:                 A ENGR Units I Digital States:       GPM ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum instrument Range:         150 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     S Number of Sensors:                 1 How Processed:                     RE:USD (REFERENCE UNIQ SYS DESC)
Sensor Locations                  N/A Alarm I Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC2CC21RCS CHG/MU2SPl114CHG PUMP FLOWPRIMARY SYSTEM CHARGING/MAKEUP FAGPMN/A0150N/AN/AS1RE:USD (REFERENCE UNIQ SYS DESC)N/AN/AN/AN/AN/ANN/ATHERE ARE 3 CHARGING PUMPS THAT ARE RATED TO SUPPLY 44 GPMEACH TO THE RCS (REACTOR COOLANT SYSTEM). CHARGING PUMP #23CAN BE POWERED FROM ONE OF TWO BUSSES #21 OR #24. WHICH MUSTBE MANUALLY SELECTED BY A 'KIRK" KEY INTERLOCK SCHEME.
THERE ARE 3 CHARGING PUMPS THAT ARE RATED TO SUPPLY 44 GPM EACH TO THE RCS (REACTOR COOLANT SYSTEM). CHARGING PUMP #23 CAN BE POWERED FROM ONE OF TWO BUSSES #21 OR #24. WHICH MUST BE MANUALLY SELECTED BY A 'KIRK" KEY INTERLOCK SCHEME.
PWR Data Point Library Reference FileReport Date :Page :06-24-201521Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            21 Date:                             5/4/2015 Reactor Unit:                     002 Data Feeder:                       0021 NRC ERDS Parameter:               HP SI FLOW Point ID:                         2SP2115 Plant Specific Point


== Description:==
== Description:==
Generic / Condition
HPSI FLOW Generic / Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units /Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
HIGH PRESSURE SAFETY INJECTION F Analog / Digital:                 A ENGR Units /Digital States:       GPM ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:         1600 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 4 How Processed:                     SUM OF FLOW LOOPS 21A, 21B, 22A, 22B Sensor Locations                  N/A Alarm I Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/20150020021HP SI FLOW2SP2115HPSI FLOWHIGH PRESSURE SAFETY INJECTION FAGPMN/A01600N/AN/AP4SUM OF FLOW LOOPS 21A, 21B, 22A, 22BN/AN/AN/AN/AN/ANN/A3 HIGH PRESSURE SAFETY INJECTION PUMPS DELIVER EMERGENCYCOOLANT TO ALL FOUR COLD LEGS. SHUTOFF HEAD PRESSURE IS 1275PSIA. ONLY TWO PUMPS WILL START. 22 HPSI IS MAINTAINED IN PULL TOLOCK. 2 INDEPENDENT SUCTION HEADERS SUPPLY WATER FROM THEREFUELING WATER TANK UNTIL THE TANK IS DOWN TO 10% FULL. AFTERTHE RWT IS DOWN TO 10% FULL THE HPSI LINE IS CHANGED TOPROVIDE SUCTION FROM THE CONTAINMENT SUMP.
3 HIGH PRESSURE SAFETY INJECTION PUMPS DELIVER EMERGENCY COOLANT TO ALL FOUR COLD LEGS. SHUTOFF HEAD PRESSURE IS 1275 PSIA. ONLY TWO PUMPS WILL START. 22 HPSI IS MAINTAINED IN PULL TO LOCK. 2 INDEPENDENT SUCTION HEADERS SUPPLY WATER FROM THE REFUELING WATER TANK UNTIL THE TANK IS DOWN TO 10% FULL. AFTER THE RWT IS DOWN TO 10% FULL THE HPSI LINE IS CHANGED TO PROVIDE SUCTION FROM THE CONTAINMENT SUMP.
PWR Data Point Library Reference FileReport Date :Page :06-24-201522Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :             22 Date:                              5/4/2015 Reactor Unit:                     CC2 Data Feeder:                       0021 NRC ERDS Parameter:               LP SI FLOW Point ID:                         2SP2116 Plant Specific Point


== Description:==
== Description:==
Generic / Condition
LPSI FLOW Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
LOW PRESSURE SAFETY INJECTION FL Analog I Digital:                 A ENGR Units / Digital States:       GPM ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:         8000 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     S Number of Sensors:                 1 How Processed:                     INSTRUMENT VALUE Sensor Locations                  N/A Alarm / Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:
Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC20021LP SI FLOW2SP2116LPSI FLOWLOW PRESSURE SAFETY INJECTION FLAGPMN/A08000N/AN/AS1INSTRUMENT VALUEN/AN/AN/AN/AN/AN/A2 LOW PRESSURE SAFETY INJECTION PUMPS SUPPLY LOW HEAD/HIGHVOLUME COOLANT TO THE COLD LEGS. EACH LPSI PUMP TAKES ASUCTION OFF A SEPARATE HEADER FROM THE RWT. DURINGRECIRCULATION MODE (APPROX 36 MIN AFTER A D.B.A.) THE LPSI PUMPSARE SHUT DOWN AND THE HPSI PUMPS TAKE SUCTION FROM THECONTAIMENT SUMP TO RECIRCULATE WATER THROUGH THE SYSTEM.
2 LOW PRESSURE SAFETY INJECTION PUMPS SUPPLY LOW HEAD/HIGH VOLUME COOLANT TO THE COLD LEGS. EACH LPSI PUMP TAKES A SUCTION OFF A SEPARATE HEADER FROM THE RWT. DURING RECIRCULATION MODE (APPROX 36 MIN AFTER A D.B.A.) THE LPSI PUMPS ARE SHUT DOWN AND THE HPSI PUMPS TAKE SUCTION FROM THE CONTAIMENT SUMP TO RECIRCULATE WATER THROUGH THE SYSTEM.
PWR Data Point Library Reference FileReport Date :Page :06-24-201523Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Paint
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            23 Date:                             5/4/2015 Reactor Unit:                     CC2 Data Feeder:                       CC21 NRC ERDS Parameter:               CTMNT SMP WR Point ID:                         2SP4112 Plant Specific Paint


== Description:==
== Description:==
Generic / Condition
CNTMT LEVEL Generic / Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
CONTAINMENT SUMP WIDE RNG LEVEL Analog / Digital:                 A ENGR Units I Digital States:       INCHES ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:         120 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor VP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                  N/A Alarm I Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for VP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC2CC21CTMNT SMP WR2SP4112CNTMT LEVELCONTAINMENT SUMP WIDE RNG LEVELAINCHESN/A0120N/AN/AP2AVG OF TWO CHANNELSN/AN/AN/AN/AN/AN/AN/ATHE CONTAINMENT EMERGENCY SUMP PROVIDES ADEQUATE NPSH TOBOTH HPSI AND CONTAINMENT SPRAY PUMPS WHEN IN THERECIRCULATION MODE. TWO 24" DIAMETER RECIRC LINES SUPPLYWATER TO THE CONTAINMENT SPRAY AND SAFETY INJECTION SYSTEM.THE SUMP IS COVERED WITH A METAL GRATING TO PREVENT DEBRISFROM ENTERING THE SUMP.
THE CONTAINMENT EMERGENCY SUMP PROVIDES ADEQUATE NPSH TO BOTH HPSI AND CONTAINMENT SPRAY PUMPS WHEN IN THE RECIRCULATION MODE. TWO 24" DIAMETER RECIRC LINES SUPPLY WATER TO THE CONTAINMENT SPRAY AND SAFETY INJECTION SYSTEM.
Data Point Library Reference FileReport Date :Page :06-24-201524Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
THE SUMP IS COVERED WITH A METAL GRATING TO PREVENT DEBRIS FROM ENTERING THE SUMP.
 
PWR* Data Point Library Reference File Report Date :     06-24-2015 Page :           24 Date:                              5/4/2015 Reactor Unit:                       CC2 Data Feeder:                       CC21 NRC ERDS Parameter:                 EFF GAS RAD Point ID:                           2R54151 Plant Specific Point


== Description:==
== Description:==
Generic / Condition
WR EFF MONITOR Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum instrument Range:Zero Point  
RADIOACTIVITY OF RELEASED GASSES Analog I Digital:                   A ENGR Units / Digital States:       UCI/SEC ENGR Units Conversion:             N/A Minimum Instrument Range:           1E1 Maximum instrument Range:           1E13 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                       S Number of Sensors:
How Processed:                     INVERSE LOG OF INSTRUMENT VALUE Sensor Locations                    N/A Alarm I Trip Setpoints:             N/A NI Detector Power Supply Cut-Off Power Level:         N/A NI Detector Power Supply Turn-on Power Level:         N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC2CC21EFF GAS RAD2R54151WR EFF MONITORRADIOACTIVITY OF RELEASED GASSESAUCI/SECN/A1E11E13N/AN/ASINVERSE LOG OF INSTRUMENT VALUEN/AN/AN/AN/AN/AN/AN/ATHE EFFLUENT GAS RADIATION MONITOR MEASURES MAIN VENT STACKEFFLUENT GROSS ACTIVITY. 3 CHANNELS: LOW, MEDIUM, & HIGH AREUSED TO PROVIDE AN OUTPUT TO A FOURTH PSEUDO CHANNEL. THERANGE OF ACTIVITY DETECTED DETERMINES WHICH CHANNEL (L,M,H) ISSELECTED. THE OUTPUT OF THE FOURTH CHANNEL COMBINES GASIOUSFLOW WITH THE MEASURED ACTIVITY TO PROVIDE THE EFFECTIVEEFFLUENT GROSS ACTIVITY.
THE EFFLUENT GAS RADIATION MONITOR MEASURES MAIN VENT STACK EFFLUENT GROSS ACTIVITY. 3 CHANNELS: LOW, MEDIUM, & HIGH ARE USED TO PROVIDE AN OUTPUT TO A FOURTH PSEUDO CHANNEL. THE RANGE OF ACTIVITY DETECTED DETERMINES WHICH CHANNEL (L,M,H) IS SELECTED. THE OUTPUT OF THE FOURTH CHANNEL COMBINES GASIOUS FLOW WITH THE MEASURED ACTIVITY TO PROVIDE THE EFFECTIVE EFFLUENT GROSS ACTIVITY.
PWR Data Point Library Reference FileReport Date :Page :06-24-201525Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            25 Date:                             5/4/2015 Reactor Unit:                     002 Data Feeder:                       0021 NRC ERDS Parameter:               EFF LIQ RAD Point ID:                         2SP6120 Plant Specific Point


== Description:==
== Description:==
Generic / Condition
LIQUID WASTE RAD Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum instrument Range:Maximum instrument Range:Zero Point  
RADIOACTIVITY OF RELEASED LIQUID Analog I Digital:                 A ENGR Units I Digital States:       CPM ENGR Units Conversion:             N/A Minimum instrument Range:         1E1 Maximum instrument Range:         1E6 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:N umber of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P N umber of Sensors:               3 How Processed:                     INVERSE LOG OF INSTRUMENT VALUE Sensor Locations                  N/A Alarm I Trip Setpoints:           X >= 4.21 E5 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/20150020021EFF LIQ RAD2SP6120LIQUID WASTE RADRADIOACTIVITY OF RELEASED LIQUIDACPMN/A1E11E6N/AN/AP3INVERSE LOG OF INSTRUMENT VALUEN/AX >= 4.21 E5N/AN/AN/AN/AN/ALIQUID WASTE PROCESSING MONITORS THE COMMON DISCHARGEHEADER FROM REACTOR COOLANT WASTE PROCESSING AND MISCWASTE PROCESS. 50000 CPM WILL AUTOMATICALLY CLOSE 2DISCHARGE VALVES 0-CV-2201 & 0-CV-2202 TO ISOLATE FLOW TO THECIRCULATION WATER DISCHARGE CONDUITS. ALARM LIMIT GIVEN INALARM/TRIP SET POINT IS THE SPDS ALARM LIMIT.
LIQUID WASTE PROCESSING MONITORS THE COMMON DISCHARGE HEADER FROM REACTOR COOLANT WASTE PROCESSING AND MISC WASTE PROCESS. 50000 CPM WILL AUTOMATICALLY CLOSE 2 DISCHARGE VALVES 0-CV-2201 &0-CV-2202 TO ISOLATE FLOW TO THE CIRCULATION WATER DISCHARGE CONDUITS. ALARM LIMIT GIVEN IN ALARM/TRIP SET POINT IS THE SPDS ALARM LIMIT.
PWR Data Point Library Reference FileReport Date :Page :06-24-201526Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Paint
 
PWR Data Point Library Reference File Report Date :       06-24-2015 Page :              26 Date:                             5/4/2015 Reactor Unit:                     002 Data Feeder:                       0C21 NRC ERDS Parameter:               COND A/E RAD Point ID:                         2SP6117 Plant Specific Paint


== Description:==
== Description:==
Generic / Condition
OFF GAS RAD Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
CONDENSER AIR EJECTOR RADIOACTIV Analog I Digital:                 A ENGR Units I Digital States:       GPD ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:         250 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 4 How Processed:                     REFERENCE UNIQUE SYSTEM DESCRIPTION Sensor Locations                  N/A Alarm I Trip Setpoints:           X >= 5 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/20150020C21COND A/E RAD2SP6117OFF GAS RADCONDENSER AIR EJECTOR RADIOACTIVAGPDN/A0250N/AN/AP4REFERENCE UNIQUE SYSTEM DESCRIPTIONN/AX >= 5N/AN/AN/AN/AN/ATHE CONDENSER AIR EJECTOR DISCHARGE MONITOR INCLUDES FOURRADIATION SENSORS. ONE SENSOR IS INSTALLED IN THE SUCTION SIDEOF EACH OF THE FOUR CONDENSER AIR REMOVAL PUMPS. OUTPUTSIGNALS ARE DISPLAYED IN THE CONTROL ROOM. THE AUCTIONEEREDHIGH SIGNAL IS CONVERTED FROM CPM TO GALLONS PER DAY (GPO)AND IS USED AS AN EARLY INDICATION OF A PRIMARY TO SECONDARYLEAK THROUGH THE S/G TUBES.
THE CONDENSER AIR EJECTOR DISCHARGE MONITOR INCLUDES FOUR RADIATION SENSORS. ONE SENSOR IS INSTALLED INTHE SUCTION SIDE OF EACH OF THE FOUR CONDENSER AIR REMOVAL PUMPS. OUTPUT SIGNALS ARE DISPLAYED INTHE CONTROL ROOM. THE AUCTIONEERED HIGH SIGNAL IS CONVERTED FROM CPM TO GALLONS PER DAY (GPO)
PWR Data Point Library Reference FileReport Date :Page :06-24-201527Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Paint ID:Plant Specific Point
AND IS USED AS AN EARLY INDICATION OF A PRIMARY TO SECONDARY LEAK THROUGH THE S/G TUBES.
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :             27 Date:                              5/4/2015 Reactor Unit:                     CC2 Data Feeder:                       CC21 NRC ERDS Parameter:               CNTMNT RAD Paint ID:                         2SP6121 Plant Specific Point


== Description:==
== Description:==
Generic I Condition
CNTMT RAD Generic I Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units /Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
RADIATION LEVEL IN CONTAINMENT Analog I Digital:                 A ENGR Units /Digital States:       R/H R ENGR Units Conversion:             N/A Minimum Instrument Range:
Maximum Instrument Range:         1E8 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                  N/A Alarm I Trip Setpoints:           X >=6 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC2CC21CNTMNT RAD2SP6121CNTMT RADRADIATION LEVEL IN CONTAINMENTAR/H RN/A1E8N/AN/AP2AVG OF TWO CHANNELSN/AX >=6N/AN/AN/AN/AN/ATHESE CONTAINMENT RADIATION MONITORS MEASURE GAMMARADIATION LEVELS IN CONTAINMENT UNDER ACCIDENT CONDITIONS.THE DETECTORS ARE LOCATED AT THE 73-FOOT LEVEL AND AREPLACED NEAR THE PRESSURIZER AND #21 STEAM GEN.
THESE CONTAINMENT RADIATION MONITORS MEASURE GAMMA RADIATION LEVELS INCONTAINMENT UNDER ACCIDENT CONDITIONS.
PWR Data Point Library Reference FileReport Date :Page :06-24-20 1528Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
THE DETECTORS ARE LOCATED AT THE 73-FOOT LEVEL AND ARE PLACED NEAR THE PRESSURIZER AND #21 STEAM GEN.
 
PWR Data Point Library Reference File Report Date :     06-24-20 15 Page :           28 Date:                              5/4/2015 Reactor Unit:                     002 Data Feeder:                       0021 NRC ERDS Parameter:               RCS LTDN RAD Point ID:                         2R5202!
Plant Specific Point


== Description:==
== Description:==
Generic I Condition
PROCESS RAD MONITOR Generic I Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
RAD LEVEL OF RCS LETDOWN LINE Analog I Digital:                 A ENGR Units / Digital States:       KCPM ENGR Units Conversion:             N/A Minimum Instrument Range:         1 E-2 Maximum Instrument Range:         1E3 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm /Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     S Number of Sensors:                 1 How Processed:                     INVERSE LOG OF INSTRUMENT VALUE Sensor Locations                  N/A Alarm /Trip Setpoints:             N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/20150020021RCS LTDN RAD2R5202!PROCESS RAD MONITORRAD LEVEL OF RCS LETDOWN LINEAKCPMN/A1 E-21E3N/AN/AS1INVERSE LOG OF INSTRUMENT VALUEN/AN/AN/AN/AN/AN/AN/ATHE CVCS LTDN RAD MONITOR IS INSTALLED IN THE LET DOWN LINE TOMONITOR GROSS REACTOR COOLANT ACTIVITY INDICATING APOTENTIAL FUEL ELEMENT FAILURE.
THE CVCS LTDN RAD MONITOR IS INSTALLED IN THE LET DOWN LINE TO MONITOR GROSS REACTOR COOLANT ACTIVITY INDICATING A POTENTIAL FUEL ELEMENT FAILURE.
PWR Data Point Library Reference FileReport Date :Page :06-24-201529Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            29 Date:                             5/4/2015 Reactor Unit:                     002 Data Feeder:                       0021 NRC ERDS Parameter:               MAIN SL 1/A Point ID:                         2R5421 !
Plant Specific Point


== Description:==
== Description:==
Generic / Condition
MAIN STM RAD LP 21 Generic / Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 21 STEAM LINE RAD LEVEL Analog / Digital:                 A ENGR Units I Digital States:       uCi/cc ENGR Units Conversion:             N/A Minimum Instrument Range:         1 E-2 Maximum Instrument Range:         1 E5 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     S Number of Sensors:                 1 How Processed:                     INVERSE LOG OF INSTRUMENT VALUE Sensor Locations                  N/A Alarm / Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/20150020021MAIN SL 1/A2R5421 !MAIN STM RAD LP 21STM GEN 21 STEAM LINE RAD LEVELAuCi/ccN/A1 E-21 E5N/AN/AS1INVERSE LOG OF INSTRUMENT VALUEN/AN/AN/AN/AN/AN/AN/ATHE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FORNOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARELOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIVROOM.
THE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FOR NOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARE LOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIV ROOM.
PWR Data Point Library Reference FileReport Date :Page :06-24-201530Date:Reactor Unit:Data Feeder:NRC EROS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :           30 Date:                            5/4/2015 Reactor Unit:                     002 Data Feeder:                     CC21 NRC EROS Parameter:               MAIN SL 2/B Point ID:                         2R5422!
Plant Specific Point


== Description:==
== Description:==
Generic I Condition
MAIN STM RAD LP 22 Generic I Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 22 STEAM LINE RAD LEVEL Analog / Digital:                 A ENGR Units I Digital States:     uCi/cc ENGR Units Conversion:             N/A Minimum Instrument Range:         1 E-2 Maximum Instrument Range:         1 E5 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor OP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     S Number of Sensors:
How Processed:                     INVERSE LOG OF INSTRUMENT VALUE Sensor Locations                  N/A Alarm I Trip Setpoints:           N/A NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for OP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015002CC21MAIN SL 2/B2R5422!MAIN STM RAD LP 22STM GEN 22 STEAM LINE RAD LEVELAuCi/ccN/A1 E-21 E5N/AN/ASINVERSE LOG OF INSTRUMENT VALUEN/AN/AN/AN/AN/AN/AN/ATHE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FORNOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARELOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIVROOM.
THE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FOR NOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARE LOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIV ROOM.
PWR Data Point Library Reference FileReport Date : 06-24-2015Page : 31Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :           31 Date:                             5/4/2015 Reactor Unit:                     CC2 Data Feeder:                       0021 NRC ERDS Parameter:               SG BD RAD 1A Point ID:                         2R401 4!
Plant Specific Point


== Description:==
== Description:==
Generic / Condition
STM GEN BLOWDOWN ACTIVITY Generic / Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
STM GEN 21 BLOWDOWN RAD LEVEL Analog / Digital:                 A ENGR Units I Digital States:       CPM ENGR Units Conversion:             N/A Minimum Instrument Range:         1E1 Maximum Instrument Range:         1E6 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     S Number of Sensors:
How Processed:                     INVERSE LOG OF INSTRUMENT VALUE Sensor Locations                  N/A Alarm / Trip Setpoints:           X >= 5E4 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC20021SG BD RAD 1A2R401 4!STM GEN BLOWDOWN ACTIVITYSTM GEN 21 BLOWDOWN RAD LEVELACPMN/A1E11E6N/AN/ASINVERSE LOG OF INSTRUMENT VALUEN/AX >= 5E4N/AN/AN/AN/AN/ATHIS DETECTOR MONITORS A SMALL PORTION OF THE STM GENBLOWDOWN TO PROVIDE OPERATORS WITH AN EARLY INDICATION OFSTM GEN U-TUBE LEAKAGE. ACTUATION OF THE HIGH ALARMAUTOMATICALLY SHUT THE SURFACE BLOWDOWN AND THE BOTTIOMBLOWDOWN ISOLATION VALVES. OF BOTH #11 & #12 STEAMGENERATORS THIS MONITOR IS IN THE LINE OF THE BLOWDOWN TANKAND IS COMMON TO BOTH STM GEN.
THIS DETECTOR MONITORS A SMALL PORTION OF THE STM GEN BLOWDOWN TO PROVIDE OPERATORS WITH AN EARLY INDICATION OF STM GEN U-TUBE LEAKAGE. ACTUATION OF THE HIGH ALARM AUTOMATICALLY SHUT THE SURFACE BLOWDOWN AND THE BOTTIOM BLOWDOWN ISOLATION VALVES. OF BOTH #11 & #12 STEAM GENERATORS THIS MONITOR IS INTHE LINE OF THE BLOWDOWN TANK AND IS COMMON TO BOTH STM GEN.
PWR Data Point Library Reference FileReport Date :Page :06-24-201532Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Paint ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :       06-24-2015 Page :              32 Date:                             5/4/2015 Reactor Unit:                     CC2 Data Feeder:                       CC21 NRC ERDS Parameter:               CTMNT PRESS Paint ID:                         2SP411 0 Plant Specific Point


== Description:==
== Description:==
Generic / Condition
CNTMT PRESSURE Generic / Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
CONTAINMENT PRESSURE Analog / Digital:                 A ENGR Units I Digital States:       PSIG ENGR Units Conversion:             N/A Minimum Instrument Range:         -5 Maximum Instrument Range:         150 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 3 How Processed:                     AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)
Sensor Locations                  N/A Alarm I Trip Setpoints:           X >= 2.8 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC2CC21CTMNT PRESS2SP411 0CNTMT PRESSURECONTAINMENT PRESSUREAPSIGN/A-5150N/AN/AP3AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)N/AX >= 2.8N/AN/AN/AN/AN/ATHERE ARE A TOTAL OF 3 CONTAINMENT PRESSURE INDICATORS. TWOPROVIDE WIDE RANGE PRESSURE INDICATION, -5 TO +150 AND 0 TO 150PSIG, FOR POST ACCIDENT MONITORING. THE THIRD INDICATOR IS ANARROW RANGE IND1CATION -5 TO +5 PSIG WHICH PROVIDESCONTAINMENT DIFFERENTIAL PRESSURE. ACTUATIONS OCCUR: CIS @2.8 PSlG; CSAS @ 4.25 PSIG; SIAS @ 2.8 PSIG; RPS @ 2.4 PSlG.
THERE ARE A TOTAL OF 3 CONTAINMENT PRESSURE INDICATORS. TWO PROVIDE WIDE RANGE PRESSURE INDICATION, -5 TO +150 AND 0 TO 150 PSIG, FOR POST ACCIDENT MONITORING. THE THIRD INDICATOR IS A NARROW RANGE IND1CATION -5 TO +5 PSIG WHICH PROVIDES CONTAINMENT DIFFERENTIAL PRESSURE. ACTUATIONS OCCUR: CIS @
PWR Data Point Library Reference FileReport Date :Page :06-24-201533Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
2.8 PSlG; CSAS @ 4.25 PSIG; SIAS @ 2.8 PSIG; RPS @ 2.4 PSlG.
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :             33 Date:                              5/4/2015 Reactor Unit:                     CC2 Data Feeder:                       CC21 NRC ERDS Parameter:               CTMNT TEMP Point ID:                         2SP4tl 1 Plant Specific Point


== Description:==
== Description:==
Generic / Condition
CNTMT TEMPERATURE Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
CONTAINMENT TEMPERATURE Analog I Digital:                 A ENGR Units / Digital States:       D EGF ENGR Units Conversion:             N/A Minimum Instrument Range:         50 Maximum Instrument Range:         300 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     AVG OF TWO CHANNELS Sensor Locations                  N/A Alarm / Trip Setpoints:           X >= 220 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC2CC21CTMNT TEMP2SP4tl 1CNTMT TEMPERATURECONTAINMENT TEMPERATUREAD EGFN/A50300N/AN/AP2AVG OF TWO CHANNELSN/AX >= 220N/AN/AN/AN/AN/ATHERE ARE 2 CONTAINMENT TEMP DETECTORS. ONE MEASURES DOMETEMP, ANOTHER MEASURES THE REACTOR CAVITY TEMP. BOTH OFTHESE PROVIDE INDICATION TO THE CONTROL ROOM OPERATORS.
THERE ARE 2 CONTAINMENT TEMP DETECTORS. ONE MEASURES DOME TEMP, ANOTHER MEASURES THE REACTOR CAVITY TEMP. BOTH OF THESE PROVIDE INDICATION TO THE CONTROL ROOM OPERATORS.
PWR Data Point Library Reference FileReport Date :Page :06-24-201534Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :             34 Date:                              5/4/2015 Reactor Unit:                     002 Data Feeder:                       0021 NRC ERDS Parameter:               BWST LEVEL Point ID:                         2SP2RWLVL Plant Specific Point


== Description:==
== Description:==
Generic / Condition
REFUELING WATER TANK LEVEL Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
BORATED WATER STORAGE TANK LEVEL Analog I Digital:                 A ENGR Units I Digital States:       FEET ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:         40 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
TNKBOT Reference Point Notes              RE:USD (REFERENCE UNIQ SYS DESC)
Proc or Sens:                     P Number of Sensors:                 2 How Processed:                     WR SENSOR WHEN OUTSIDE NR SENSOR BAND Sensor Locations                    N/A Alarm / Trip Setpoints:             N/A NI Detector Power Supply Cut-Off Power Level:         N/A NI Detector Power Supply Turn-on Power Level:         N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               WET Unique System


== Description:==
== Description:==
5/4/20150020021BWST LEVEL2SP2RWLVLREFUELING WATER TANK LEVELBORATED WATER STORAGE TANK LEVELAFEETN/A040TNKBOTRE:USD (REFERENCE UNIQ SYS DESC)P2WR SENSOR WHEN OUTSIDE NR SENSOR BANDN/AN/AN/AN/AN/AN/AWETTHE REFUELING WATER TANK SUPPLIES 2300-2700 PPM BORATEDWATER TO THE SAFETY INJECTION SYSTEM AND ALSO SUPPLIES WATERFOR USE DURING REFUELING. TANK CAPACITY IS 420,000 GALS. AT 2.5FEET THE SAFETY INJECTION LINE-UP IS SWITCHED TO THERECIRCULATION MODE. THIS LEVEL IS EQUAL TO APPROX 10% OF TANKVOLUME.
THE REFUELING WATER TANK SUPPLIES 2300-2700 PPM BORATED WATER TO THE SAFETY INJECTION SYSTEM AND ALSO SUPPLIES WATER FOR USE DURING REFUELING. TANK CAPACITY IS 420,000 GALS. AT 2.5 FEET THE SAFETY INJECTION LINE-UP IS SWITCHED TO THE RECIRCULATION MODE. THIS LEVEL IS EQUAL TO APPROX 10% OF TANK VOLUME.
PWR Data Point Library Reference FileReport Date :Page :06-24-201535Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Paint ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :            35 Date:                             5/4/2015 Reactor Unit:                     002 Data Feeder:                       0021 NRC ERDS Parameter:               WIND SPEED Paint ID:                         2WS60#15SM Plant Specific Point


== Description:==
== Description:==
Generic I Condition
WIND SPEED 60 METER 15 MINUTE AVG Generic I Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
WIND SPEED AT REACTOR SITE Analog I Digital:                 A ENGR Units / Digital States:       M/S ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:         50 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm /Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     S Number of Sensors:
N/
How Processed:
N/A Sensor Locations Alarm /Trip Setpoints:             X >= 22 NI Detector Power Supply Cut-Off Power Level:       N/A NI Detector Power Supply Turn-on Power Level:       N/A Instrument Failure Mode:           LOW Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/20150020021WIND SPEED2WS60#15SMWIND SPEED 60 METER 15 MINUTE AVGWIND SPEED AT REACTOR SITEAM/SN/A050N/AN/ASN/N/AX >= 22N/AN/ALOWN/AN/AWIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTERIS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 60METER ELEVATION PWR Data Point Library Reference FileReport Date :Page :06-24-201536Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
WIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 60 METER ELEVATION
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :           36 Date:                            5/4/2015 Reactor Unit:                     CC2 Data Feeder:                       CC21 NRC ERDS Parameter:               WIND DIR Point ID:                         2WD60#15M Plant Specific Point


== Description:==
== Description:==
Generic / Condition
WIND DIRECTION 60 METER 15 MINUTE AVG Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units!/ Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
WIND DIRECTION AT REACTOR SITE Analog I Digital:                 A ENGR Units!/ Digital States:       DEG ENGR Units Conversion:             N/A Minimum Instrument Range:         0 Maximum Instrument Range:         360 Zero Point  


==Reference:==
==Reference:==
Reference Paint NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Paint Notes              N/A Proc or Sens:                     S Number of Sensors:
N/
How Processed:
N/A Sensor Locations N/A Alarm I Trip Setpoints:
NI Detector Power                  N/A Supply Cut-Off Power Level:
NI Detector Power                  N/A Supply Turn-on Power Level:
Instrument Failure Mode:           0 DEGREES (NORTH)
Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC2CC21WIND DIR2WD60#15MWIND DIRECTION 60 METER 15 MINUTE AVGWIND DIRECTION AT REACTOR SITEADEGN/A0360N/AN/ASN/N/AN/AN/AN/A0 DEGREES (NORTH)N/AN/AWIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THEPRIMARY MET TOWER ON SITE. 60 METER ELEVATION  
WIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER ON SITE. 60 METER ELEVATION
-w1PWR Data Point Library Reference FileReport Date :Page :06-24-201537Date:Reactor Unit:Data Feeder:NRC EROS Parameter:Point ID:Plant Specific Point
 
-w1 PWR Data Point Library Reference File Report Date :     06-24-2015 Page :             37 Date:                              5/4/2015 Reactor Unit:                     CC2 Data Feeder:                       0021 NRC EROS Parameter:               WIND SPEED Point ID:                         2WS10#15M Plant Specific Point


== Description:==
== Description:==
Generic / Condition
WIND SPEED 10 METER 15 MINUTE AVG Generic / Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
WIND SPEED AT REACTOR SITE Analog I Digital:                   A ENGR Units I Digital States:       M/S ENGR Units Conversion:             N/A Minimum Instrument Range:           0 Maximum Instrument Range:           50 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                       S Number of Sensors:                 1 How Processed:                     N/A Sensor Locations                    N/A Alarm I Trip Setpoints:             X >= 22 NI Detector Power Supply Cut-Off Power Level:         N/A NI Detector Power Supply Turn-on Power Level:         N/A Instrument Failure Mode:           LOW Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC20021WIND SPEED2WS10#15MWIND SPEED 10 METER 15 MINUTE AVGWIND SPEED AT REACTOR SITEAM/SN/A050N/AN/AS1N/AN/AX >= 22N/AN/ALOWN/AN/AWIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTERIS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 10METER ELEVATION PWR Data Point Library Reference FileReport Date :Page :06-24-201538Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
WIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 10 METER ELEVATION
 
PWR Data Point Library Reference File Report Date :     06-24-2015 Page :           38 Date:                              5/4/2015 Reactor Unit:                     CC2 Data Feeder:                       CC21 NRC ERDS Parameter:               WIND DIR Point ID:                         2WD1 0#15M Plant Specific Point


== Description:==
== Description:==
Generic / Condition
WIND DIRECTION 10 METER 15 MINUTE AVG Generic / Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
WIND DIRECTION AT REACTOR SITE Analog / Digital:                   A ENGR Units I Digital States:       DEG ENGR Units Conversion:             N/A Minimum Instrument Range:           0 Maximum Instrument Range:           360 Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor OP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                       S Number of Sensors:                 1 How Processed:                     N/A Sensor Locations                    N/A Alarm I Trip Setpoints:             N/A NI Detector Power Supply Cut-Off Power Level:         N/A NI Detector Power Supply Turn-on Power Level:         N/A Instrument Failure Mode:           0 DEGREES (NORTH)
Temperature Compensation for OP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015CC2CC21WIND DIR2WD1 0#15MWIND DIRECTION 10 METER 15 MINUTE AVGWIND DIRECTION AT REACTOR SITEADEGN/A0360N/AN/AS1N/AN/AN/AN/AN/A0 DEGREES (NORTH)N/AN/AWIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THEPRIMARY MET TOWER ON SITE. 10 METER ELEVATION PWR Data Point Library Reference FileReport Date :Page :06-24-201539Date:Reactor Unit:Data Feeder:NRC EROS Parameter:Point ID:Plant Specific Point
WIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER ON SITE. 10 METER ELEVATION
 
PWR Data Point Library Reference File Report Date :         06-24-2015 Page :                 39 Date:                              5/4/2015 Reactor Unit:                     002 Data Feeder:                       CC2 1 NRC EROS Parameter:               ATMOSPHERIC STABILITY Point ID:                         2MMS_DTASTB Plant Specific Point


== Description:==
== Description:==
WIND STABILITY BASED ON DELTA TEMP (A)
Generic 1 Condition
Generic 1 Condition


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
AIR STABILITY AT REACTOR SITE Analog / Digital:                   A ENGR Units I Digital States:       N/A ENGR Units Conversion:             N/A Minimum Instrument Range:           0 (A)
Maximum Instrument Range:           6 (G)
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm /Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor OP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                       P Number of Sensors:
How Processed:                     COMPLEX Sensor Locations                    N/A Alarm /Trip Setpoints:             N/A NI Detector Power Supply Cut-Off Power Level:         N/A NI Detector Power Supply Turn-on Power Level:         N/A Instrument Failure Mode:           N/A Temperature Compensation for OP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/2015002CC2 1ATMOSPHERIC STABILITY2MMS_DTASTBWIND STABILITY BASED ON DELTA TEMP (A)AIR STABILITY AT REACTOR SITEAN/AN/A0 (A)6 (G)N/AN/APCOMPLEXN/AN/AN/AN/AN/AN/AN/AATMOSPHERIC STABILITY BASED ON DELTA T (60 METER TEMPERATUREMINUS 10 METER TEMPERATURE, CHANNEL A). CALCULATED ON THEPLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITYCLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A,I=B, 2=C, 3=D, 4=E, 5=F, 6=G PWR Data Point Library Reference FileReport Date :Page :06-24-201540Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
ATMOSPHERIC STABILITY BASED ON DELTA T (60 METER TEMPERATURE MINUS 10 METER TEMPERATURE, CHANNEL A). CALCULATED ON THE PLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITY CLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A, I=B, 2=C, 3=D, 4=E, 5=F, 6=G
 
PWR Data Point Library Reference File Report Date :         06-24-2015 Page :                40 Date:                             5/4/2015 Reactor Unit:                     002 Data Feeder:                       0021 NRC ERDS Parameter:               ATMOSPHERIC STABILITY Point ID:                         2MMS_S60STB Plant Specific Point


== Description:==
== Description:==
Generic I Condition
60 METER WIND STABILITY        - SIGMA-THETA Generic I Condition


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
AIR STABILITY AT REACTOR SITE Analog I Digital:                   A ENGR Units I Digital States:       N/A ENGR Units Conversion:             N/A Minimum Instrument Range:           0 (A)
Maximum Instrument Range:           6 (G)
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
N/A Reference Point Notes              N/A Proc or Sens:                     P Number of Sensors:
How Processed:                     COMPLEX Sensor Locations                    N/A Alarm I Trip Setpoints:             N/A NI Detector Power Supply Cut-Off Power Level:         N/A NI Detector Power Supply Turn-on Power Level:         N/A Instrument Failure Mode:           N/A Temperature Compensation for DP Transmitters:               N/A Level Reference Leg:               N/A Unique System


== Description:==
== Description:==
5/4/20150020021ATMOSPHERIC STABILITY2MMS_S60STB60 METER WIND STABILITY -SIGMA-THETAAIR STABILITY AT REACTOR SITEAN/AN/A0 (A)6 (G)N/AN/APCOMPLEXN/AN/AN/AN/AN/AN/AN/AATMOSPHERIC STABILITY BASED ON SIGMA-THETA. CALCULATED ONTHE PLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITYCLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A,1=B, 2=C, 3=D, 4=E, 5=F, 6=G}}
ATMOSPHERIC STABILITY BASED ON SIGMA-THETA. CALCULATED ON THE PLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITY CLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A, 1=B, 2=C, 3=D, 4=E, 5=F, 6=G}}

Latest revision as of 11:31, 5 February 2020

Submittal of Emergency Response Data System Revision
ML15197A032
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 07/13/2015
From: Laura Smith
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML15197A032 (86)


Text

Larry D. Smith Regulatory Assurance Manager Exe!.on Generation Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 410 495 5219 Office 410 610 9729 Mobile www.exeloncorp.com La rry.Smith2@exeloncorp.com 10 CFR 50, Appendix E July 13, 2015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318

Subject:

Emerqjencv Response Data System The attached revision to the Emergency Response Data System (ERDS) Data Point Library for the Calvert Cliffs Nuclear Power Plant is provided pursuant to 10 CFR Part 50, Appendix E, Section VI.3.a. The revision is described below.

The table below provides a brief summary of the changes:

Unit 1 DPL Pae Point ID Description of Change

1) Plant Specific Point Description changed from LOG POWER to Wide Range Power.
2) Generic/Condition Description changed from NI WIDE RANGE LOG REACTOR PWR to Nuclear Instruments, Power Range.

1 1Si 109 3) ENGR Units changed from % POWER to  %.

4) Minimum Instrument Range changed from 1 E-7 to 1 E-8.
5) Unique System Description changed from '...provides a

______logarithmic indication...' to '...provides an indication...'

1) Number of Sensors changed from 32 to 16.

2 1SP2112 2) Unique System Descriptions changed from "...strategically near the vicinity..." to ". ..strategically in a vacant CEA shroud assembly near the vicinity..."

1) How Processed description changed to AVG EACH QUADRANT'S PTS, SHOW HIGH AVG
2) Unique System Description changed to CORE EXIT THERMOCOUPLES ARE LOCATED AT THE TOP OF THE 31SP2113 INCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN 35 SELECTED FUEL ASSEMBLIES. THESE DETECTORS ARE DIVIDED INTO QUADRANTS AND EACH QUADRANT IS AVERAGED. THIS POINT IS THE HIGHEST QUADRANT AVG.

Document Control Desk July 13, 2015 Page 2 Unit 1 DPL Pacie Point ID Description of Change v 1) Minimum and Maximum Instrument Range fields changed to N/A.

2) Number of sensors changed to 37 (35 CETs and 2 pressure sensors) 41SP3123 3) Unique System Description changed to: CORE SUBCOOLED MARGIN IS CALCULATED BY THE SATURATION TEMPERATURE AS DETERMINED FROM PRESSURIZER PRESSURE (SP3120) MINUS THE CORE EXIT TEMP

($P211 3).

1) ENGR Units changed from % FLOW to  %.

51 F131 A 2) Number of sensors changed to 2 (1 per SG)

3) Proc or Sens changed to P 6 1SP3I17A No changes other than point ID.

7 1SP3117B No changes other than point ID.

8 1SP3116A No changes other than point ID.

9 1SP3116B No changes other than point ID.

1) Minimum and Maximum Instrument Range changed to N/A.

10 1 Fl111% 2) Number of Sensors changed to 8.

3) Unique System Description, first line updated to THIS IS A TEMPERATURE COMPENSATED FEED FLOW.

11 1Fl1121% 1) Minimum and Maximum Instrument Range changed to N/A.

2) Number of Sensors changed to 8 12 1SP3118A Maximum Instrument Range changed to 1250.

13 1SP3118B Maximum Instrument Range changed to 1250.

14 1SP0106A No changes other than point ID.

15 1SP0106B No changes other than point ID.

16 1SP3113A No changes other than point ID.

17 1SP3113B No changes other than point ID.

18 1 SP3120 No changes other than point ID.

19 1 SP2109 No changes other than point ID.

1) Proc or Sens changed to S.

20 1SP1114 2) Number of Sensors changed to 1

3) Unique System Descriptions updated.

21 1SP2115 No changes other than point ID.

22 1SP2116 Proc or Sens changed to S.

23 1SP4112 No changes other than point ID.

24 1 R5415! Proc or Sens changed to S.

25 1S5P6120 How Processed changed to Inverse Log of Instrument Value.

26 1SP6117 How Processed changed to Reference Unique System Description.

Document Control Desk July 13, 2015 Page 3 Unit 1 Point IDDescription of Change 27 1SP6121 No changes other than point ID.

28 1 R5202! Proc or Sens changed to S.

29 1 5421! 1) Proc or Sens changed to S.

2) How Processed changed to Inverse Log of Instrument Value.

30 1R5422! 1) Proc or Sens changed to S.

2) How Processed changed to Inverse Log of Instrument Value.
1) Proc or Sens changed to S.

31 1R4014! 2) How Processed changed to Inverse Log of Instrument Value.

3) Alarm / Trip Setpoints format changed to match other DPL entries.

32 1SP4110 Unique System Descriptions updated.

33 1SP4111 No changes other than point ID.

1) Zero Point Reference changed to TNKBOT 34 1SP2RWLVL 2) How Processed changed to WR sensor when outside NR sensor band 35 1WS60#15M Engr Units changed to M/S (no spaces).

36 1WD60#15M No changes other than point ID.

37 1WS10#15M No changes other than point ID.

38 1WD10#15M No changes other than point ID.

39 1 MMSDTASTB No changes other than point ID.

40 1 MMS_S60STB No changes other than point ID.

Unit 2 DPL Pae Point ID Change

1) Plant Specific Point Description changed from LOG POWER to Wide Range Power.
2) Generic/Condition Description changed from NI WIDE RANGE 109 LOG REACTOR PWR to Nuclear Instruments, Power Range.

1 25P13) ENGR Units changed from % POWER to  %.

4) Minimum Instrument Range changed from 1 E-7 to 1 E-8.
5) Unique System Description changed from '...provides a logarithmic indication...' to '...provides an indication...'
1) Number of Sensors changed from 32 to 16.

2 2SP2112 2) Unique System Descriptions changed from "...strategically near the vicinity..." to "...strategically in a vacant CEA shroud

_____________ assembly near the vicinity..."

Document Control Desk July 13, 2015 Page 4 Unit 2 Pae Point ID Change

1) How Processed description changed to AVG EACH QUADRANT'S PTS, SHOW HIGH AVG
2) Unique System Description changed to CORE EXIT THERMOCOUPLES ARE LOCATED AT THE TOP OF THE 3 2SP2113 INCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN 35 SELECTED FUEL ASSEMBLIES. THESE DETECTORS ARE DIVIDED INTO QUADRANTS AND EACH QUADRANT IS AVERAGED. THIS POINT IS THE HIGHEST QUADRANT AVG.
1) Minimum and Maximum Instrument Range fields changed to N/A.
2) Number of sensors changed to 37 (35 CETs and 2 pressure sensors)
3) Unique System Description changed to: CORE SUBCOOLED 4 2SP3123 MARGIN IS CALCULATED BY THE SATURATION TEMPERATURE AS DETERMINED FROM PRESSURIZER PRESSURE (SP3120) MINUS THE CORE EXIT TEMP (SF2113).
4) How Processed changed to RE: USD (REFERENCE UNIQUE SYS DESC).
1) ENGR Units changed from % FLOW to %.

5 2F131A 2) Number of sensors changed to 2 (1 per SG)

3) Proc or Sens changedto P 6 2SP3117A No changes other than point ID.

7 2SP3117B No changes other than point ID.

8 2SP31 16A Alarm / Trip Setpoints, X >= changed from 985 to 950.

9 2SP311 6B Alarm / Trip Setpoints, X >= changed from 985 to 950.

1) Minimum and Maximum Instrument Range changed to N/A.

10 2F1 11% 2) Number of Sensors changed to 8.

3) Unique System Description, first line updated to THIS IS A TEMPERATURE COMPENSATED FEED FLOW.
1) Minimum and Maximum Instrument Range changed to N/A.

11 2F1 121% 2) Number of Sensors changed to 8

3) Unique System Description, first line updated to THIS IS A TEMPERATURE COMPENSATED FEED FLOW.

12 2SP3118A Maximum Instrument Range changed to 1250.

13 2SP3118B Maximum Instrument Range changed to 1250.

14 2SP0106A No changes other than point ID.

15 2SP0106B No changes other than point ID.

16 2SP3113A Alarm / Trip Setpoints, X <= changed from 504 to 525.

17 2SP3113B Alarm I Trip Setpoints, X <= changed from 504 to 525.

18 2SP3I20 No changes other than point ID.

Document Control Desk July 13, 2015 Page 5 Unit 2 Pae Point ID Change 19 2SP2109 Alarm / Trip Setpoints, X >= changed from 300 to 305.

1) Proc or Sens changed to S.

20 2SPl114 2) Number of Sensors changed to 1

_____________3) Unique System Descriptions updated, 21 2SP2115 No changes other than point ID.

22 2SP2116 Proc or Sens changed to S.

23 2SP4112 No changes other than point ID.

The "before" and "after" ERDS Data Point Library sheets are attached.

There are no regulatory commitments contained in this correspondence.

Should you have questions regarding this matter, please contact me at (410) 495-5219.

Respectfully, Regulatory Assurance Manager LDS/PSF/bjm

Attachment:

Emergency Response Data System Data Point Library (80 pages) cc: NRC Project Manager, Calvert Cliffs NRC Resident Inspector, Calvert Cliffs NRC Regional Administrator, Region I S. Gray, MD-DNR

ATTACHM ENT EMERGENCY RESPONSE DATA SYSTEM DATA POINT LIBRARY (80 pages)

Calvert Cliffs Nuclear Power Plant July 13, 2015

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 1 Date: 5/4/2015 Reactor Unit: CC 1 Data Feeder: CCll NRC ERDS Parameter: NI POWER RNG Point ID: 1SPll109 Plant Specific Point

Description:

WIDE RANGE POWER Generic I Condition

Description:

NUCLEAR INSTRUMENTS, POWER RANGE Analog I Digital: A ENGR Units / Digital States:

ENGR Units Conversion: N/A Minimum Instrument Range: 1E-8 Maximum instrument Range: 200 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 4 How Processed: AVG OF THE TWO CLOSEST CHANNEL VALUES Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

WIDE RANGE NUCLEAR INSTRUMENTATION PROVIDES AN INDICATION OF REACTOR POWER AS A PERCENT OF REACTOR POWER. START UP RATE REACTOR TRIP IS GIVEN FROM WIDE RANGE NUCLEAR INSTRUMENTS BETWEEN THE RANGE OF 1E-4% TO 15% POWER. THESE DETECTORS ARE FISSION CHAMBERS WHICH DO NOT GET DEENERGIZED DURING NORMAL POWER OPERATIONS.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 2 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: REC VES LEV Point ID: 1SP2112 Plant Specific Point

Description:

REACTOR VESSEL LEVEL Generic I Condition

Description:

REACTOR VESSEL WATER LEVEL Analog / Digital: A ENGR Units / Digital States: INCHES ENGR Units Conversion: N/A Minimum Instrument Range: N/A Maximum Instrument Range: N/A Zero Point

Reference:

FAP Reference Point Notes N/A Proc or Sens: P Number of Sensors: 16 How Processed: RE:USD (REFERENCE UNIQUE SYS DESC)

Sensor Locations 160,151,112,71,50,29,19, & 10" ABOVE FAP Alarm / Trip Setpoints: VOID DETECTED NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

8 HEATED JUNCTION THERMOCOUPLES (HJTC) ARE SPACED STRATEGICALLY IN A VACANT CEA SHROUD ASSEMBLY NEAR THE VICINITY OF ONE HOT LEG OUTLET NOZZLE. AS HJTC IS UNCOVERED THE LVL THAT THE REACTOR HEAD IS UNCOVERED IS INDICATED IN INCREMENTAL STEPS. THE 1ST HJTC IS 160" FROM TOP OF FUEL ALIGNMENT PLATE(FAP); 8TH HJTC IS 10" FROM FAP; 5TH HJTC IS 50" FROM FAP WHICH IS THE CENTER LINE OF THE HOT LEGS. HOW PROCESSED: WHEN LVL DECREASES A VOID INTHE HJTC WILL PROVIDE AN OUTPUT SIGNAL FOR THAT SPECIFIC HJTC POSITION.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 3 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CC1 1 NRC ERDS Parameter: TEMP CORE EX Point ID: 1SP2113 Plant Specific Point

Description:

CORE EXIT TEMP Generic / Condition

Description:

HIGHEST TEMP AT THE CORE EXIT Analog I Digital: A ENGR Units / Digital States: DEGF ENGR Units Conversion: N/A Minimum Instrument Range: 40 Maximum Instrument Range: 2300 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sons: P Number of Sensors: 35 How Processed: AVG EACH QUADRANT'S PTS:SHOW HIGH AVG Sensor Locations N/A Alarm / Trip Setpoints: X >= 650 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

CORE EXIT THERMOCOUPLES ARE LOCATED AT THE TOP OF THE INCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN 35 SELECTED FUEL ASSEMBLIES. THESE DETECTORS ARE DIVIDED INTO QUADRANTS AND EACH QUADRANT IS AVERAGED. THIS POINT IS THE HIGHEST QUADRANT AVG.

PWR Data Point Library Reference Fi~e Report Date : 06-24-2015 Page : 4 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: SUB MARGIN Point ID: 1SP3123 Plant Specific Point

Description:

CORE SUBCOOLED MARGIN Generic / Condition

Description:

SATURATION TEMPERATURE-HIGH CET Analog I Digital: A ENGR Units / Digital States: DEGF ENGR Units Conversion: N/A Minimum Instrument Range: N/A Maximum Instrument Range: N/A Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 37 How Processed: RE:USD (REFERENCE UNIQUE SYS DESC)

Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

CORE SUBCOOLED MARGIN IS CALCULATED BY THE SATURATION TEMPERATURE AS DETERMINED FROM PRESSURIZER PRESSURE (SP3120) MINUS THE CORE EXIT TEMP (SP211 3).

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 5 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: CORE FLOW Point ID: 1F131A Plant Specific Point

Description:

RCS TOTAL FLOW CH A Generic / Condition

Description:

TOTAL REACTOR COOLANT FLOW Analog I Digital: A ENGR Units I Digital States:

ENGR Units Conversion: 100% RX COOLANT FLOW = 370,000 GPM Minimum Instrument Range: -53.57 Maximum Instrument Range: 151.48 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: N/A Sensor Locations N/A Alarm / Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters:- N/A Level Reference Leg: N/A Unique System

Description:

REACTOR COOLANT FLOW IS DETERMINED BY THE D/P ACROSS THE STEAM GENERATORS. WHERE TOTAL FLOW IS THE SUM OF BOTH LOOP FLOWS.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 6 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: OCil1 NRC ERDS Parameter: SG LEVEL 1/A Point ID: 1SP3117A Plant Specific Point

Description:

SG LEVEL LOOP 11 Generic / Condition

Description:

STEAM GENERATOR 11 WATER LEVEL Analog I Digital: A ENGR Units / Digital States: INCH ES ENGR Units Conversion: N/A Minimum Instrument Range: -401.0 Maximum Instrument Range: 63.5 Zero Point

Reference:

N/A Reference Point Notes 0" = 40" ABOVE THE FEED RING Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm I Trip Setpoints: X >= 50 X <=-170 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: WET Unique System

Description:

A LOW LEVEL REACTOR TRIP OCCURS AT -50" AS READ ON THE NARROW RANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170' AS READ ON THE WIDE RANGE SIG LVL DETECTOR. POINT ID SP3117A IS A WIDE RANGE LVL INDICATOR.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 7 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: SG LEVEL 2/B Point ID: 1SP3117B Plant Specific Point

Description:

SG LEVEL LOOP 12 Generic I Condition

Description:

STEAM GENERATOR 12 WATER LEVEL Analog I Digital: A ENGR Units I Digital States: INCHES ENGR Units Conversion: N/A Minimum Instrument Range: -401.0 Maximum Instrument Range: 63.5 Zero Point

Reference:

N/A Reference Point Notes 0' = 40" ABOVE THE FEED RING Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm I Trip Setpoints: X>=50 X<=-170 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: WET Unique System

Description:

A LOW LEVEL REACTOR TRIP OCCURS AT -50" AS READ ON THE NARROW RANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170" AS READ ON THE WIDE RANGE SIG LVL DETECTOR. POINT ID SP3117B IS A WIDE RANGE LVL INDICATOR.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 8 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: SG PRESS 1/A Point ID: 1SP3116A Plant Specific Point

Description:

SG PRESSURE LOOP 11 Generic I Condition

Description:

STEAM GENERATOR 11 PRESSURE Analog I Digital: A ENGR Units I Digital States: PSIA ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 1200 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm I Trip Setpoints: X>= 950 X<= 703 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

REACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEAT EXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LINE RUPTURE OR COMP FAILURE.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 9 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: SG PRESS 2/B Point ID: 1SP3116B Plant Specific Point

Description:

SG PRESSURE LOOP 12 Generic I Condition

Description:

STEAM GENERATOR 12 PRESSURE Analog I Digital: A ENGR Units I Digital States: PSIA ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 1200 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: p Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm /Trip Setpoints: X>=950 X<=703 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

REACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEAT EXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LiNE RUPTURE OF COMP FAILURE.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 10 Date: 5/4/2015 Reactor Unit:

CCll Data Feeder:

NRC ERDS Parameter: MN FD FL 1/A Point ID: 1F1111%

Plant Specific Point

Description:

FW FLOW TO STEAM GEN. 11 Generic / Condition

Description:

STM GEN 11 MAIN FEEDWATER FLOW Analog!/ Digital: A ENGR Units I Digital States: KLB/HR ENGR Units Conversion: N/A Minimum Instrument Range: N/A Maximum Instrument Range: N/A Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 8 How Processed: COMPLEX Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters:

Level Reference Leg: N/A Unique System

Description:

THIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVEN MAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATER EXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEED REG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONED TO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARE RUNNING.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 11 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: MN FD FL 2/B Point ID: 1F1121%

Plant Specific Point

Description:

FW FLOW TO STEAM GEN. 12 Generic I Condition

Description:

STM GEN 12 MAIN FEEDWATER FLOW Analog I Digital: A ENGR Units I Digital States: KLB/HR ENGR Units Conversion: N/A Minimum Instrument Range: N/A Maximum Instrument Range: N/A Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 8 How Processed: COMPLEX Sensor Locations N/A Alarm / Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters:

Level Reference Leg: N/A Unique System

Description:

THIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVEN MAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATER EXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEED REG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONED TO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARE RUNNING.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 12 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: AX FD FL 1/A Point ID: 1SP3118A Plant Specific Point

Description:

AUX FEED FLOW LOOP 11 Generic / Condition

Description:

STM GEN 11 AUXILIARY FW FLOW Analog I Digital: A.

ENGR Units / Digital States: GPM ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 1250 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCH Sensor Locations N/A Alarm / Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N Level Reference Leg: N/A Unique System

Description:

THERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRIC DRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMON HEADER FOR BOTH #11 &#12 STM GENS. THE MOTOR DRIVEN PUMP DISCHARGES TO A SEPARATE HEADER FOR BOTH #11 &#12 STM GENS.

BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOR EACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM

  1. 12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP IS NORMALLY ALIGNED TO START.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 13 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: AX FD FL 2/B Point ID: 1SP3I18B Plant Specific Point

Description:

AUX FEED FLOW LOOP 12 Generic / Condition

Description:

STM GEN 12 AUXILIARY FW FLOW Analog I Digital: A ENGR Units / Digital States: GPM ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 1250 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCH Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Tem perature Comnpensation for DP Transmitters: N Level Reference Leg: N/A Unique System

Description:

THERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRIC DRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMON HEADER FOR BOTH #11 &#12 STM GENS. THE MOTOR DRIVEN PUMP DISCHARGES TO A SEPARATE HEADER FOR BOTH #11 & #12 STM GENS.

BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOR EACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM

  1. 12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP IS NORMALLY ALIGNED TO START.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 14 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: HL TEMP 1/A Point ID: 1SP0106A Plant Specific Point

Description:

THOT LOOP 11 Generic / Condition

Description:

STM GEN 11 INLET TEMPERATURE Analog / Digital: A ENGR Units I Digital States: DEGF ENGR Units Conversion: N/A Minimum Instrument Range: 50 Maximum Instrument Range: 700 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm / Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THE STEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUIT FOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 15 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: HL TEMP 2/B Point ID: 1SP0I06B Plant Specific Point

Description:

THOT LOOP 12 Generic / Condition

Description:

STM GEN 12 INLET TEMPERATURE Analog I Digital: A ENGR Units / Digital States: DEGF ENGR Units Conversion: N/A Minimum Instrument Range: 50 Maximum Instrument Range: 700 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm / Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THE STEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUIT FOR A TOTAL POWER CALCULATION INTHE REACTOR PROTECTION SYSTEM.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 16 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: CL TEMP 1/A Point ID: 1 SP3I113A Plant Specific Point

Description:

TCOLD LOOP 11 Generic / Condition

Description:

STM GEN 11 OUTLET TEMPERATURE Analog I Digital: A ENGR Units / Digital States: DEGF ENGR Units Conversion: N/A Minimum Instrument Range: 50 Maximum Instrument Range: 700 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 3 How Processed: AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)

Sensor Locations N/A Alarm / Trip Setpoints: X>= 560 X<=525 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SET POINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANEL INDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP)

CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TO BE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 17 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: CL TEMP 2/B Point ID: 1SP3I13B Plant Specific Point

Description:

TCOLD LOOP 12 Generic I Condition

Description:

STM GEN 12 OUTLET TEMPERATURE Analog / Digital: A ENGR Units / Digital States: DEGF ENGR Units Conversion: N/A Minimum Instrument Range: 50 Maximum Instrument Range: 700 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 3 How Processed: AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)

Sensor Locations N/A Alarm/ITrip Setpoints: X>=560 X<=525 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temnperature Comnpensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SET POINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANEL INDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TMILP)

CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TO BE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 18 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CC11 NRC ERDS Parameter: RCS PRESSURE Point ID: 1 SP3120 Plant Specific Point

Description:

PRESSURIZER PRESSURE Generic I Condition

Description:

REACTOR COOLANT SYSTEM PRESSURE Analog / Digital: A ENGR Units / Digital States: PSIA ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 4000 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm / Trip Setpoints: X >= 2400 X <= 1740 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

REACTOR COOLANT PRESSURE IS THE AVERAGE OF 2 WIDE RANGE PRESSURIZER PRESSURE DETECTORS. THE SAFETY VALVES ARE SET TO OPEN AT 2500#. HIGH PRESSURE REACTOR TRIP OCCURS AT 2400#.

PORVS OPEN AT 2400 PSIA ON A REACTOR TRIP FROM HIGH PRESSURE.

SPRAY VALVE SETPOINT IS DEPENDENT ON CONTROLLER SETPOINT.

BOTH SPRAY VALVES CLOSE AT 2300 PSIA. ESFAS ACTUATION IS INITIATED AT 1740#.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 19 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CC11 NRC ERDS Parameter: PRZR LEVEL Point ID: 1SP2109 Plant Specific Point

Description:

PRESSURIZER LEVEL Generic / Condition

Description:

PRIMARY SYSTEM PRESSURIZER LEVEL Analog I Digital: A ENGR Units I Digital States: INCHES ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 360 Zero Point

Reference:

RE: USD Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm / Trip Setpoints: X>=305 X<=50 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Tem perature Comnpensation for DP Transmitters: N/A Level Reference Leg: WET Unique System

Description:

PRESSURIZER LEVEL IS NORMALLY CONTROLLED IN A BAND BETWEEN 160' TO 216" DURING NORMAL POWER OPERATIONS. PRESSURIZER HEATERS CUTOUT AT A LEVEL OF 101" INTHE PRESSURIZER.

PRESSURIZER HEATERS WJLL START TO BE UNCOVERED AT APPROX 84" OF INDICATED LEVEL. ZERO POINT

REFERENCE:

BOTTIOM OF PRESSURIZER.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 20 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: RCS CHG/MU Point ID: 1SPil114 Plant Specific Point

Description:

CHG PUMP FLOW Generic I Condition

Description:

PRIMARY SYSTEM CHARGING/MAKEUP F Analog I Digital: A ENGR Units / Digital States: GPM ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 150 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors: 1 How Processed: RE:USD (REFERENCE UNIQ SYS DESC)

Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N Level Reference Leg: N/A Unique System

Description:

THERE ARE 3 CHARGING PUMPS THAT ARE RATED TO SUPPLY 44 GPM EACH TO THE RCS (REACTOR COOLANT SYSTEM). CHARGING PUMP #13 CAN BE POWERED FROM ONE OF TWO BUSSES #11 OR #14. WHICH MUST BE MANUALLY SELECTED BY A "KIRK" KEY INTERLOCK SCHEME.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 21 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: HP SI FLOW Point ID: 1SP2115 Plant Specific Point

Description:

HPSI FLOW Generic / Condition

Description:

HIGH PRESSURE SAFETY INJECTION F Analog I Digital: A ENGR Units / Digital States: GPM ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 1600 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 4 How Processed: SUM OF FLOW LOOPS 11A, 11B, 12A, 12B Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N Level Reference Leg: N/A Unique System

Description:

3 HIGH PRESSURE SAFETY INJECTION PUMPS DELIVER EMERGENCY COOLANT TO ALL FOUR COLD LEGS. SHUTOFF HEAD PRESSURE IS 1275 PSIA. ONLY TWO PUMPS WILL START. 12 HPSI IS MAINTAINED IN PULL TO LOCK. 2 INDEPENDENT SUCTION HEADERS SUPPLY WATER FROM THE REFUELING WATER TANK UNTIL THE TANK IS DOWN TO 10% FULL. AFTER THE RWTI IS DOWN TO 10% FULL THE HPSI LINE IS CHANGED TO PROVIDE SUCTION FROM THE CONTAINMENT SUMP.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 22 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: LP SI FLOW Point ID: lSP2116 Plant Specific Point

Description:

LPSI FLOW Generic 1Condition

Description:

LOW PRESSURE SAFETY INJECTION FL Analog I Digital: A ENGR Units I Digital States: GPM ENGR Units Conversion: N/A Minimum Instrument Range: 0

-Maximum Instrument Range: 8000 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors: 1 How Processed: INSTRUMENT VALUE Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters:

Level Reference Leg: N/A Unique System

Description:

2 LOW PRESSURE SAFETY INJECTION PUMPS SUPPLY LOW HEAD/HIGH VOLUME COOLANT TO THE COLD LEGS. EACH LPSI PUMP TAKES A SUCTION OFF A SEPARATE HEADER FROM THE RWT. DURING RECIRCULATION MODE (APPROX 36 MIN AFTER A D.B.A.) THE LPSI PUMPS ARE SHUT DOWN AND THE HPSI PUMPS TAKE SUCTION FROM THE CONTAIMENT SUMP TO RECIRCULATE WATER THROUGH THE SYSTEM.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 23 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: CTMNT SMP WR Point ID: 1SP4112 Plant Specific Point

Description:

CNTMT LEVEL Generic / Condition

Description:

CONTAINMENT SUMP WIDE RNG LEVEL Analog I Digital: A ENGR Units I Digital States: INCHES ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 120 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm / Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THE CONTAINMENT EMERGENCY SUMP PROVIDES ADEQUATE NPSH TO BOTH HPSI AND CONTAINMENT SPRAY PUMPS WHEN IN THE RECIRCULATION MODE. "TWO24" DIAMETER RECIRC LINES SUPPLY WATER TO THE CONTAINMENT SPRAY AND SAFETY INJECTION SYSTEM.

THE SUMP IS COVERED WITH A METAL GRATING TO PREVENT DEBRIS FROM ENTERING THE SUMP.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 24 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: EFF GAS RAD Point ID: 1R5415!

Plant Specific Point

Description:

WR EFF MONITOR Generic I Condition

Description:

RADIOACTIVITY OF RELEASED GASSES Analog / Digital: A ENGR Units I Digital States: UCI/SEC ENGR Units Conversion: N/A Minimum Instrument Range: 1 El Maximum Instrument Range: 1El13 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors: 1 How Processed: INVERSE LOG OF INSTRUMENT VALUE Sensor Locations N/A Alarm / Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THE EFFLUENT GAS RADIATION MONITOR MEASURES MAIN VENT STACK EFFLUENT GROSS ACTIVITY. 3 CHANNELS: LOW, MEDIUM, & HIGH ARE USED TO PROVIDE AN OUTPUT TO A FOURTH PSEUDO CHANNEL. THE RANGE OF ACTIVITY DETECTED DETERMINES WHICH CHANNEL (L,M,H) IS SELECTED. THE OUTPUT OF THE FOURTH CHANNEL COMBINES GASIOUS FLOW WITH THE MEASURED ACTIVITY TO PROVIDE THE EFFECTIVE EFFLUENT GROSS ACTIVITY.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 25 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: EFF LIQ RAD Point ID: 1SP6120 Plant Specific Point

Description:

LIQUID WASTE RAD Generic / Condition

Description:

RADIOACTIVITY OF RELEASED LIQUID Analog I Digital: A ENGR Units / Digital States: CPM ENGR Units Conversion: N/A Minimum Instrument Range: 1E1 Maximum Instrument Range: 1E6 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 3 How Processed: INVERSE LOG OF INSTRUMENT VALUE Sensor Locations N/A Alarm / Trip Setpoints: X >= 4.21 E5 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

LIQUID WASTE PROCESSING MONITORS THE COMMON DISCHARGE HEADER FROM REACTOR COOLANT WASTE PROCESSING AND MISC WASTE PROCESS. 50000 CPM WILL AUTOMATICALLY CLOSE 2 DISCHARGE VALVES 0-CV-2201 &0-CV-2202 TO ISOLATE FLOW TO THE CIRCULATION WATER DISCHARGE CONDUITS. ALARM LIMIT GIVEN IN ALARM/TRIP SET POINT IS THE SPDS ALARM LIMIT.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 26 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: COND A/E RAD Point ID: 1SP6117 Plant Specific Point

Description:

OFF GAS RAD Generic I Condition

Description:

CONDENSER AIR EJECTOR RADIOACTIV Analog / Digital: A ENGR Units / Digital States: GPD ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 250 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 4 How Processed: REFERENCE UNIQUE SYSTEM DESCRIPTION Sensor Locations N/A Alarm / Trip Setpoints: X >= 5 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THE CONDENSER AIR EJECTOR DISCHARGE MONITOR INCLUDES FOUR RADIATION SENSORS. ONE SENSOR IS INSTALLED IN THE SUCTION SIDE OF EACH OF THE FOUR CONDENSER AIR REMOVAL PUMPS. OUTPUT SIGNALS ARE DISPLAYED IN THE CONTROL ROOM. THE AUCTIONEERED HIGH SIGNAL IS CONVERTED FROM CPM TO GALLONS PER DAY (GPD)

AND IS USED AS AN EARLY INDICATION OF A PRIMARY TO SECONDARY LEAK THROUGH THE S/G TUBES.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 27 Date: 5/4/2015 Reactor Unit:

CCll Data Feeder:

NRC ERDS Parameter: CNTMNT RAD Paint ID: 1 SP6121 Plant Specific Point

Description:

CNTMT RAD Generic I Condition

Description:

RADIATION LEVEL IN CONTAINMENT Analog I Digital: A ENGR Units I Digital States: R/HR ENGR Units Conversion: N/A Minimum Instrument Range: 1 Maximum Instrument Range: 1 E8 Zero Point

Reference:

"N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm I Trip Setpoints: X >= 6 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THESE CONTAINMENT RADIATION MONITORS MEASURE GAMMA RADIATION LEVELS IN CONTAINMENT UNDER ACCIDENT CONDITIONS.

THE DETECTORS ARE LOCATED AT THE 73-FOOT LEVEL AND ARE PLACED NEAR THE PRESSURIZER AND #11 STEAM GEN.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 28 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: RCS LTDN RAD Point ID: 1 R5202!

Plant Specific Point

Description:

PROCESS RAD MONITOR Generic / Condition

Description:

RAD LEVEL OF RCS LETDOWN LINE Analog I Digital: A ENGR Units / Digital States: CPM ENGR Units Conversion: N/A Minimum Instrument Range: 1E1 Maximum Instrument Range: 1 E6 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors: 1 How Processed: INVERSE LOG OF INSTRUMENT VALUE Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THE CVCS LTDN RAD MONITOR IS INSTALLED IN THE LET DOWN LINE TO MONITOR GROSS REACTOR COOLANT ACTIVITY INDICATING A POTENTIAL FUEL ELEMENT FAILURE.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 29 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll1 NRC ERDS Parameter: MAIN SL I/A Point ID: 1 R5421 !

Plant Specific Point

Description:

MAIN STM RAD LP 11 Generic / Condition

Description:

STM GEN 11 STEAM LINE RAD LEVEL Analog / Digital: A ENGR Units / Digital States: uCi/cc ENGR Units Conversion: N/A Minimum Instrument Range: I1E-2 Maximum Instrument Range: I1E5 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors: 1 How Processed: INVERSE LOG OF INSTRUMENT VALUE Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FOR NOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARE LOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIV ROOM.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 30 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: MAIN SL 2/B Point ID: 1 R5422!

Plant Specific Point

Description:

MAIN STM RAD LP 12 Generic I Condition

Description:

STM GEN 12 STEAM LINE RAD LEVEL Analog I Digital: A ENGR Units I Digital States: uCi/cc ENGR Units Conversion: N/A Minimum Instrument Range: 1 E-2 Maximum Instrument Range: 1 E5 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors: 1 How Processed: INVERSE LOG OF INSTRUMENT VALUE Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FOR NOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARE LOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIV ROOM.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 31 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: SG BD RAD IA Point ID: iR4014!

Plant Specific Point

Description:

STM GEN BLOWDOWN ACTIVITY Generic / Condition

Description:

STM GEN 11 BLOWDOWN RAD LEVEL Analog I Digital: A ENGR Units I Digital States: CPM ENGR Units Conversion: N/A Minimum Instrument Range: 1 El Maximum Instrument Range: 1 E6 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors: 1 How Processed: INVERSE LOG OF INSTRUMENT VALUE Sensor Locations N/A Alarm / Trip Setpoints: X >= 5E4 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THIS DETECTOR MONITORS A SMALL PORTION OF THE STM GEN BLOWDOWN TO PROVIDE OPERATORS WITH AN EARLY INDICATION OF STM GEN U-TUBE LEAKAGE. ACTUATION OF THE HIGH ALARM AUTOMATICALLY SHUT THE SURFACE BLOWDOWN AND THE BOTT-IOM BLOWDOWN ISOLATION VALVES. OF BOTH #11 &#12 STEAM GENERATORS THIS MONITOR IS INTHE LINE OF THE BLOWDOWN TANK AND IS COMMON TO BOTH STM GEN.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 32 Date: 5/412015 Reactor Unit: CC1 Data Feeder: CC11 NRC ERDS Parameter: CTMNT PRESS Point ID: 1 SP41 10 Plant Specific Point

Description:

CNTMT PRESSURE Generic I Condition

Description:

CONTAINMENT PRESSURE Analog / Digital: A ENGR Units / Digital States: PSIG ENGR Units Conversion: N/A Minimum Instrument Range: -5 Maximum Instrument Range: 150 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 3 How Processed: AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)

Sensor Locations N/A Alarm I Trip Setpoints: X >= 2.8 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THERE ARE A TOTAL OF 3 CONTAINMENT PRESSURE INDICATORS. TWO PROVIDE WIDE RANGE PRESSURE INDICATION, -5 TO +150 AND 0 TO 150 PSIG, FOR POST ACCIDENT MONITORING. THE THIRD INDICATOR IS A NARROW RANGE INDICATION -5 TO +5 PSIG WHICH PROVIDES CONTAINMENT DIFFERENTIAL PRESSURE. ACTUATIONS OCCUR: CIS @

2.8 PSIG; CSAS @ 4.25 PSIG; SIAS @ 2.8 PSIG; RPS @ 2.4 PSIG.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 33 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC EROS Parameter: CTMNT TEMP Point ID: 1SP4I111 Plant Specific Point

Description:

CNTMT TEMPERATURE Generic I Condition

Description:

CONTAINMENT TEMPERATURE Analog I Digital: A ENGR Units / Digital States: DEGF ENGR Units Conversion: N/A Minimum Instrument Range: 50 Maximum Instrument Range: 300 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm / Trip Setpoints: X >= 220 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for OP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THERE ARE 2 CONTAINMENT TEMP DETECTORS. ONE MEASURES DOME TEMP, ANOTHER MEASURES THE REACTOR CAVITY TEMP. BOTH OF THESE PROVIDE INDICATION TO THE CONTROL ROOM OPERATORS.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 34 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll1 NRC ERDS Parameter: BWST LEVEL Point ID: 1 SP2RWLVL Plant Specific Point

Description:

REFUELJNG WATER TANK LEVEL Generic / Condition

Description:

BORATED WATER STORAGE TANK LEVEL Analog I Digital: A ENGR Units / Digital States: FEET ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 40 Zero Point

Reference:

TNKBOT Reference Point Notes RE:USD (REFERENCE UNIQ SYS DESC)

Proc or Sens: P Number of Sensors: 2 How Processed: WR SENSOR WHEN OUTSIDE NR SENSOR BAND Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: WET Unique System

Description:

THE REFUELING WATER TANK SUPPLIES 2300-2700 PPM BORATED WATER TO THE SAFETY INJECTION SYSTEM AND ALSO SUPPLIES WATER FOR USE DURING REFUELING. TANK CAPACITY IS 420,000 GALS. AT 2.5 FEET THE SAFETY INJECTION LINE-UP IS SWITCHED TO THE RECIRCULATION MODE. THIS LEVEL IS EQUAL TO APPROX 10% OF TANK VOLUME.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 35 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: WIND SPEED Point ID: 1WS60#15SM Plant Specific Point

Description:

WiND SPEED 60 METER 15 MINUTE AVG Generic I Condition

Description:

WIND SPEED AT REACTOR SITE Analog I Digital: A ENGR Units I Digital States: M/S ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 50 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors: 1 How Processed: N/A Sensor Locations N/A Alarm I Trip Setpoints: X >= 22 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: LOW Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

WIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 60 METER ELEVATION

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 36 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: WIND DIR Point ID: 1WD60#15SM Plant Specific Point

Description:

WIND DIRECTION 60 METER 15 MINUTE AVG Generic / Condition

Description:

WIND DIRECTION AT REACTOR SITE Analog I Digital: A ENGR Units I Digital States: DEG ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 360 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors: 1 How Processed: N/A Sensor Locations N/A Alarm / Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: 0 DEGREES (NORTH)

Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

WIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER ON SITE. 60 METER ELEVATION

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 37 Date: 5/4/2015 Reactor Unit: CCI Data Feeder: CCIl NRC ERDS Parameter: WIND SPEED Point ID: 1WS10#15M Plant Specific Paint

Description:

WIND SPEED 10 METER 15 MINUTE AVG Generic I Condition

Description:

WIND SPEED AT REACTOR SITE Analog / Digital: A ENGR Units I Digital States: M/S ENGR Units Conversion: N/A Minimum instrument Range: 0 Maximum Instrument Range: 50 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors: 1 How Processed: N/A Sensor Locations N/A Alarm I Trip Setpoints: X >= 22 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: LOW Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

WIND SPEED INDICATION INMETERS PER SECOND TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 10 METER ELEVATION

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 38 Date: 5/4/2015 Reactor Unit: CCl Data Feeder: CCll NRC ERDS Parameter: WIND DIR Point ID: 1WD10#15M Plant Specific Point

Description:

WIND DIRECTION 10 METER 15 MINUTE AVG Generic I Condition

Description:

WIND DIRECTION AT REACTOR SITE Analog I Digital: A ENGR Units I Digital States: DEG ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 360 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors: 1 How Processed: N/A Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: 0 DEGREES (NORTH)

Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

WIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER ON SITE. 10 METER ELEVATION

PWR Data Point Library Reference File Report Date : 06-24-20 15 Page : 39 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: ATMOSPHERIC STABILITY Point ID: 1MMS_DTASTB Plant Specific Point

Description:

WIND STABILITY BASED ON DELTA TEMP (A)

Generic / Condition

Description:

AIR STABILITY AT REACTOR SITE Analog I Digital: A ENGR Units / Digital States: N/A ENGR Units Conversion: N/A Minimum instrument Range: 0 (A)

Maximum Instrument Range: 6 (G)

Zero Point

Reference:

N/A Reference Paint Notes N/A Proc or Sens: P Number of Sensors: 1 How Processed: COMPLEX Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

ATMOSPHERIC STABILITY BASED ON DELTA T (60 METER TEMPERATURE MINUS 10 METER TEMPERATURE, CHANNEL A). CALCULATED ON THE PLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITY CLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A, I=B, 2=C, 3=D, 4=E, 5=F, 6=G

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 40 Date: 5/4/2015 Reactor Unit: CC1 Data Feeder: CCll NRC ERDS Parameter: ATMOSPHERIC STABILITY Point ID: I MMSS6OSTB Plant Specific Point

Description:

60 METER WIND STABILITY - SIGMA-THETA Generic / Condition

Description:

AIR STABILITY AT REACTOR SITE Analog / Digital: A ENGR Units I Digital States: N/A ENGR Units Conversion: N/A Minimum Instrument Range: 0 (A)

Maximum Instrument Range: 6 (G)

Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 1 How Processed: COMPLEX Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

ATMOSPHERIC STABILITY BASED ON SIGMA-THETA. CALCULATED ON THE PLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITY CLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A, 1=B, 2=C, 3=D, 4=E, 5=F, 6=G

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 1 Date: 5/4/2015 Reactor Unit: 002 Data Feeder: CC21 NRC ERDS Parameter: NI POWER RNG Point ID: 2SP1 109 Plant Specific Point

Description:

WIDE RANGE POWER Generic I Condition

Description:

NUCLEAR INSTRUMENTS, POWER RANGE Analog / Digital: A ENGR Units I Digital States:

ENGR Units Conversion: N/A Minimum Instrument Range: 1 E-8 Maximum Instrument Range: 2O00 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 4 How Processed: AVG OF THE TWO CLOSEST CHANNEL VALUES Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

WIDE RANGE NUCLEAR INSTRUMENTATION PROVIDES AN INDICATION OF REACTOR POWER AS A PERCENT OF REACTOR POWER. START UP RATE REACTOR TRIP IS GIVEN FROM WIDE RANGE NUCLEAR INSTRUMENTS BETWEEN THE RANGE OF 1E-4% TO 15% POWER. THESE DETECTORS ARE FISSION CHAMBERS WHICH DO NOT GET DEENERGIZED DURING NORMAL POWER OPERATIONS.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 2 Date: 5/4/2015 Reactor Unit: 002 Data Feeder: 0021 NRC ERDS Parameter: REC VES LEV Point ID: 2SP2112 Plant Specific Point

Description:

REACTOR VESSEL LEVEL Generic / Condition

Description:

REACTOR VESSEL WATER LEVEL Analog I Digital: A ENGR Units I Digital States: INCHES ENGR Units Conversion: N/A Minimum Instrument Range: N/A Maximum Instrument Range: N/A Zero Point

Reference:

FAP Reference Point Notes N/A Proc or Sens: P Number of Sensors: 16 How Processed: RE:USD (REFERENCE UNIQUE SYS DESC)

Sensor Locations 160,151,112,71,50,29,19, & 10" ABOVE FAP Alarm I Trip Setpoints: VOID DETECTED NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

8 HEATED JUNCTION THERMOCOUPLES (HJTC) ARE SPACED STRATEGICALLY IN A VACANT CEA SHROUD ASSEMBLY NEAR THE VICINITY OF ONE HOT LEG OUTLET NOZZLE. AS HJTC IS UNCOVERED THE LVL THAT THE REACTOR HEAD IS UNCOVERED IS INDICATED IN INCREMENTAL STEPS. THE 1ST HJTC IS 160" FROM TOP OF FUEL ALIGNMENT PLATE(FAP); 8TH HJTC IS 10" FROM FAP; 5TH HJTC IS 50" FROM FAP WHICH IS THE CENTER LINE OF THE HOT LEGS. HOW PROCESSED: WHEN LVL DECREASES A VOID IN THE HJTC WILL PROVIDE AN OUTPUT SIGNAL FOR THAT SPECIFIC HJTC POSITION.

PWR Data Point Library Reference File Report Date:* 06-24-2015 Page : 3 Date: 5/4/2015 Reactor Unit: CC2 Data Feeder: CC21 NRC ERDS Parameter: TEMP CORE EX Paint ID: 2SP2113 Plant Specific Point

Description:

CORE EXIT TEMP Generic I Condition

Description:

HIGHEST TEMP AT THE CORE EXIT Analog / Digital: A ENGR Units I Digital States: DEG F ENGR Units Conversion: N/A Minimum Instrument Range: 40 Maximum Instrument Range: 2300 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 35 How Processed: AVG EACH QUADRANT'S PTS:SHOW HIGH AVG Sensor Locations N/A Alarm / Trip Setpoints: X >= 650 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

CORE EXIT THERMOCOUPLES ARE LOCATED AT THE TOP OF THE INCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN 35 SELECTED FUEL ASSEMBLIES. THESE DETECTORS ARE DIVIDED INTO QUADRANTS AND EACH QUADRANT IS AVERAGED. THIS POINT IS THE HIGHEST QUADRANT AVG.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 4 Date: 5/4/2015 Reactor Unit: CC2 Data Feeder: 0021 NRC ERDS Parameter: SUB MARGIN Point ID: 2SP3123 Plant Specific Point

Description:

CORE SUBCOOLED MARGIN Generic / Condition

Description:

SATURATION TEMPERATURE-HIGH CET Analog I Digital: A ENGR Units / Digital States: DEGF ENGR Units Conversion: N/A Minimum Instrument Range: N/A Maximum Instrument Range: N/A Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 37 How Processed: RE: USD (REFERENCE UNIQUE SYS DESC)

Sensor Locations N/A Alarm / Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

CORE SUBCOOLED MARGIN IS CALCULATED BY THE SATURATION TEMPERATURE AS DETERMINED FROM PRESSURIZER PRESSURE (SP3120) MINUS THE CORE EXIT TEMP (SP2113).

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 5 Date: 5/4/2015 Reactor Unit: 002 Data Feeder: CC21 NRC ERDS Parameter: CORE FLOW Point ID: 2F131A Plant Specific Point

Description:

RCS TOTAL FLOW OH A Generic / Condition

Description:

TOTAL REACTOR COOLANT FLOW Analog I Digital: A ENGR Units I Digital States:

ENGR Units Conversion: 100% RX COOLANT FLOW = 370,000 GPM Minimum instrument Range: -54.35 Maximum Instrument Range: 153.68 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: N/A Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

REACTOR COOLANT FLOW IS DETERMINED BY THE 0/P ACROSS THE STEAM GENERATORS. WHERE TOTAL FLOW IS THE SUM OF BOTH LOOP FLOWS.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 6 Date: 5/4/2015 Reactor Unit: CC2 Data Feeder: CC21 NRC ERDS Parameter: SG LEVEL 1/A Point ID: 2SP3I17A Plant Specific Point

Description:

SG LEVEL LOOP 21 Generic I Condition

Description:

STEAM GENERATOR 21 WATER LEVEL Analog I Digital: A ENGR Units I Digital States: INCHES ENGR Units Conversion: N/A Minimum Instrument Range: -401.0 Maximum Instrument Range: 63.5 Zero Point

Reference:

N/A Reference Point Notes 0" = 40' ABOVE THE FEED RING Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm / Trip Setpoints: X>=50 X<=-170 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: WET Unique System

Description:

A LOW LEVEL REACTOR TRIP OCCURS AT -50" AS READ ON THE NARROW RANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170" AS READ ON THE WIDE RANGE S/G LVL DETECTOR. POINT ID SP3117A IS A WIDE RANGE LVL INDICATOR.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 7 Date: 5/4/2015 Reactor Unit: CC2 Data Feeder: CC21 NRC EROS Parameter: SG LEVEL 2/B Point ID: 2SP3117B Plant Specific Point

Description:

SG LEVEL LOOP 22 Generic / Condition

Description:

STEAM GENERATOR 22 WATER LEVEL Analog I Digital: A ENGR Units I Digital States: INCHES ENGR Units Conversion: N/A Minimum Instrument Range: -401.0 Maximum Instrument Range: 63.5 Zero Point

Reference:

N/A Reference Point Notes 0" = 40' ABOVE THE FEED RING Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm I Trip Setpoints: X>=50 X<z=-170 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: WET Unique System

Description:

A LOW LEVEL REACTOR TRIP OCCURS AT -50' AS READ ON THE NARROW RANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170" AS READ ON THE WIDE RANGE S/G LVL DETECTOR. POINT ID 5P3117B IS A WIDE RANGE LVL INDICATOR.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 8 Date: 5/4/2015 Reactor Unit: CC2 Data Feeder: CC21 NRC ERDS Parameter: SG PRESS 1/A Point ID: 2SP3116A Plant Specific Point

Description:

SG PRESSURE LOOP 21 Generic / Condition

Description:

STEAM GENERATOR 21 PRESSURE Analog / Digital: A ENGR Units I Digital States: PSIA ENGR Units Conversion: N/A Minimum instrument Range: 0 Maximum Instrument Range: 1200 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm I Trip Setpoints: X>=950 X<=703 NI Detector Power Supply Cut-Off Power Level: N/A Ni Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Tem perature Comnpensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

REACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEAT EXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LINE RUPTURE OR COMP FAILURE.

PWR Data Point Library Reference Fime Report Date : 06-24-2015 Page : 9 Date: 5/4/2015 Reactor Unit: C02 Data Feeder: 0021 NRC ERDS Parameter: SG PRESS 2/B Point ID: 2SP3116B Plant Specific Point

Description:

SG PRESSURE LOOP 22 Generic / Condition

Description:

STEAM GENERATOR 22 PRESSURE Analog / Digital: A ENGR Units / Digital States: PSIA ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 1200 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm / Trip Setpoints: X>=950 X<=703 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

REACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEAT EXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LINE RUPTURE OF COMP FAILURE.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 10 Date: 5/4/2015 Reactor Unit: CC2 Data Feeder: 0021 NRC ERDS Parameter: MN ED FL 1/A Point ID: 2F1111%

Plant Specific Point

Description:

FW FLOW TO STEAM GEN. 21 Generic I Condition

Description:

STM GEN 21 MAIN FEEDWATER FLOW Analog I Digital: A ENGR Units I Digital States: KLB/HR ENGR Units Conversion: N/A Minimum Instrument Range: N/A Maximum Instrument Range: N/A Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 8 How Processed: COMPLEX Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: Y Level Reference Leg: N/A Unique System

Description:

THIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVEN MAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATER EXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEED REG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONED TO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARE RUNNING.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 11 Date: 5/4/2015 Reactor Unit: 002 Data Feeder: 0021 NRC ERDS Parameter: MN FD FL 2/B Point ID: 2F1121%

Plant Specific Point

Description:

FW FLOW TO STEAM GEN. 22 Generic / Condition

Description:

STM GEN 22 MAIN FEEDWATER FLOW Analog I Digital: A ENGR Units I Digital States: KLB/HR ENGR Units Conversion: N/A Minimum Instrument Range: N/A Maximum Instrument Range: N/A Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 8 How Processed: COMPLEX Sensor Locations N/A Alarm / Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A instrument Failure Mode: N/A Temperature Compensation for OP Transmitters: Y Level Reference Leg: N/A Unique System

Description:

THIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVEN MAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATER EXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEED REG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONED TO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARE RUNNING.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 12 Date: 5/4/2015 Reactor Unit: 002 Data Feeder: 0021 NRC ERDS Parameter: AX FD FL 1/A Point ID: 2SP311 8A Plant Specific Point

Description:

AUX FEED FLOW LOOP 21 Generic / Condition

Description:

STM GEN 21 AUXILIARY FW FLOW Analog I Digital: A ENGR Units / Digital States: GPM ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 1250 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCH Sensor Locations N/A Alarm / Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N Level Reference Leg: N/A Unique System

Description:

THERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRIC DRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMON HEADER FOR BOTH #21 &#22 STM GENS. THE MOTOR DRIVEN PUMP DISCHARGES TO A SEPARATE HEADER FOR BOTH #21 & #22 STM GENS.

BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOR EACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM

  1. 12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP IS NORMALLY ALIGNED TO START.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 13 Date: 5/4/2015 Reactor Unit: CC2 Data Feeder: CC21 NRC ERDS Parameter: AX FD FL 2/B Point ID: 2SP3118B Plant Specific Point

Description:

AUX FEED FLOW LOOP 22 Generic / Condition

Description:

STM GEN 22 AUXILIARY FW FLOW Analog / Digital: A ENGR Units / Digital States: GPM ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 1250 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCH Sensor Locations N/A Alarm / Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N Level Reference Leg: N/A Unique System

Description:

THERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRIC DRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMON HEADER FOR BOTH #21 & #22 STM GENS. THE MOTOR DRIVEN PUMP DISCHARGES TO A SEPARATE HEADER FOR BOTH #21 & #22 STM GENS.

BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOR EACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM

  1. 12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP IS NORMALLY ALIGNED TO START.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 14 Date: 5/4/2015 Reactor Unit: CC2 Data Feeder: CC21 NRC ERDS Parameter: HL TEMP 1/A Point ID: 2SP0106A Plant Specific Point

Description:

THOT LOOP 21 Generic / Condition

Description:

STM GEN 21 INLET TEMPERATURE Analog / Digital: A ENGR Units I Digital States: 0DEG F ENGR Units Conversion: N/A Minimum instrument Range: 50 Maximum instrument Range: 700 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm /Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THE STEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUIT FOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 15 Date: 5/4/2015 Reactor Unit: 002 Data Feeder: CC21 NRC ERDS Parameter: HL TEMP 2/B Point ID: 2SP0106B Plant Specific Point

Description:

THOT LOOP 22 Generic / Condition

Description:

STM GEN 22 INLET TEMPERATURE Analog I Digital: A ENGR Units I Digital States: DEGF ENGR Units Conversion: N/A Minimum Instrument Range: 50 Maximum Instrument Range: 700 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm / Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THOT ISTHE COOLANT TEMPERATURE MEASURED AT THE INLET TO THE STEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUIT FOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 16 Date: 5/4/2015 Reactor Unit: CC2 Data Feeder: 0021 NRC ERDS Parameter: CL TEMP 1/A Point ID: 2SP3113A Plant Specific Point

Description:

TCOLD LOOP 21 Generic / Condition

Description:

STM GEN 21 OUTLET TEMPERATURE Analog I Digital: A ENGR Units I Digital States: DEGF ENGR Units Conversion: N/A Minimum Instrument Range: 50 Maximum Instrument Range: 700 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 3 How Processed: AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)

Sensor Locations N/A Alarm I Trip Setpoints: X>=560 X<=525 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SET POINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANEL INDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP)

CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TO BE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 17 Date: 5/4/2015 Reactor Unit: 002 Data Feeder: 0021 NRC ERDS Parameter: CL TEMP 2/B Point ID: 2SP311 3B Plant Specific Point

Description:

TCOLD LOOP 22 Generic / Condition

Description:

STM GEN 22 OUTLET TEMPERATURE Analog I Digital: A ENGR Units I Digital States: DEGF ENGR Units Conversion: N/A Minimum Instrument Range: 50 Maximum Instrument Range: 700 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 3 How Processed: AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)

Sensor Locations N/A Alarm I Trip Setpoints: X>=560 X<=525 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SET POINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANEL INDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP)

CIRCUIT FOR TOTAL POWER CALCULATION INTHE REACTOR PROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TO BE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 18 Date: 5/4/2015 Reactor Unit: 002 Data Feeder: CC21 NRC ERDS Parameter: RCS PRESSURE Point ID: 2SP3120 Plant Specific Point

Description:

PRESSURIZER PRESSURE Generic / Condition

Description:

REACTOR COOLANT SYSTEM PRESSURE Analog / Digital: A ENGR Units I Digital States: PSIA ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 4000 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm / Trip Setpoints: X >= 2400 X.<= 1740 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

REACTOR COOLANT PRESSURE ISTHE AVERAGE OF 2 WIDE RANGE PRESSURIZER PRESSURE DETECTORS. THE SAFETY VALVES ARE SET TO OPEN AT 2500#. HIGH PRESSURE REACTOR TRIP OCCURS AT 2400#.

PORVS OPEN AT 2400 PSIA ON A REACTOR TRIP FROM HIGH PRESSURE.

SPRAY VALVE SETPOINT IS DEPENDENT ON CONTROLLER SETPOINT.

BOTH SPRAY VALVES CLOSE AT 2300 PSIA. ESFAS ACTUATION IS INITIATED AT 1740#.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 19 Date: 5/4/2015 Reactor Unit: 002 Data Feeder: CC21 NRC ERDS Parameter: PRZR LEVEL Point ID: 2SP2109 Plant Specific Point

Description:

PRESSURIZER LEVEL Generic / Condition

Description:

PRIMARY SYSTEM PRESSURIZER LEVEL Analog / Digital: A ENGR Units / Digital States: INCHES ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 360 Zero Point

Reference:

RE: USD Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm / Trip Setpoints: X>=305 X<=50 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: WET Unique System

Description:

PRESSURIZER LEVEL IS NORMALLY CONTROLLED IN A BAND BETWEEN 160" TO 216" DURING NORMAL POWER OPERATIONS. PRESSURIZER HEATERS CUTOUT AT A LEVEL OF 101" IN THE PRESSURIZER.

PRESSURIZER HEATERS WILL START TO BE UNCOVERED AT APPROX 84' OF INDICATED LEVEL. ZERO REFERENCE POINT: BOTTOM OF PRESSURIZER.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 20 Date: 5/4/2015 Reactor Unit: CC2 Data Feeder: CC21 NRC ERDS Parameter: RCS CHG/MU Point ID: 2SPl114 Plant Specific Point

Description:

CHG PUMP FLOW Generic / Condition

Description:

PRIMARY SYSTEM CHARGING/MAKEUP F Analog / Digital: A ENGR Units I Digital States: GPM ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum instrument Range: 150 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors: 1 How Processed: RE:USD (REFERENCE UNIQ SYS DESC)

Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N Level Reference Leg: N/A Unique System

Description:

THERE ARE 3 CHARGING PUMPS THAT ARE RATED TO SUPPLY 44 GPM EACH TO THE RCS (REACTOR COOLANT SYSTEM). CHARGING PUMP #23 CAN BE POWERED FROM ONE OF TWO BUSSES #21 OR #24. WHICH MUST BE MANUALLY SELECTED BY A 'KIRK" KEY INTERLOCK SCHEME.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 21 Date: 5/4/2015 Reactor Unit: 002 Data Feeder: 0021 NRC ERDS Parameter: HP SI FLOW Point ID: 2SP2115 Plant Specific Point

Description:

HPSI FLOW Generic / Condition

Description:

HIGH PRESSURE SAFETY INJECTION F Analog / Digital: A ENGR Units /Digital States: GPM ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 1600 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 4 How Processed: SUM OF FLOW LOOPS 21A, 21B, 22A, 22B Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N Level Reference Leg: N/A Unique System

Description:

3 HIGH PRESSURE SAFETY INJECTION PUMPS DELIVER EMERGENCY COOLANT TO ALL FOUR COLD LEGS. SHUTOFF HEAD PRESSURE IS 1275 PSIA. ONLY TWO PUMPS WILL START. 22 HPSI IS MAINTAINED IN PULL TO LOCK. 2 INDEPENDENT SUCTION HEADERS SUPPLY WATER FROM THE REFUELING WATER TANK UNTIL THE TANK IS DOWN TO 10% FULL. AFTER THE RWT IS DOWN TO 10% FULL THE HPSI LINE IS CHANGED TO PROVIDE SUCTION FROM THE CONTAINMENT SUMP.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 22 Date: 5/4/2015 Reactor Unit: CC2 Data Feeder: 0021 NRC ERDS Parameter: LP SI FLOW Point ID: 2SP2116 Plant Specific Point

Description:

LPSI FLOW Generic / Condition

Description:

LOW PRESSURE SAFETY INJECTION FL Analog I Digital: A ENGR Units / Digital States: GPM ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 8000 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors: 1 How Processed: INSTRUMENT VALUE Sensor Locations N/A Alarm / Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters:

Level Reference Leg: N/A Unique System

Description:

2 LOW PRESSURE SAFETY INJECTION PUMPS SUPPLY LOW HEAD/HIGH VOLUME COOLANT TO THE COLD LEGS. EACH LPSI PUMP TAKES A SUCTION OFF A SEPARATE HEADER FROM THE RWT. DURING RECIRCULATION MODE (APPROX 36 MIN AFTER A D.B.A.) THE LPSI PUMPS ARE SHUT DOWN AND THE HPSI PUMPS TAKE SUCTION FROM THE CONTAIMENT SUMP TO RECIRCULATE WATER THROUGH THE SYSTEM.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 23 Date: 5/4/2015 Reactor Unit: CC2 Data Feeder: CC21 NRC ERDS Parameter: CTMNT SMP WR Point ID: 2SP4112 Plant Specific Paint

Description:

CNTMT LEVEL Generic / Condition

Description:

CONTAINMENT SUMP WIDE RNG LEVEL Analog / Digital: A ENGR Units I Digital States: INCHES ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 120 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for VP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THE CONTAINMENT EMERGENCY SUMP PROVIDES ADEQUATE NPSH TO BOTH HPSI AND CONTAINMENT SPRAY PUMPS WHEN IN THE RECIRCULATION MODE. TWO 24" DIAMETER RECIRC LINES SUPPLY WATER TO THE CONTAINMENT SPRAY AND SAFETY INJECTION SYSTEM.

THE SUMP IS COVERED WITH A METAL GRATING TO PREVENT DEBRIS FROM ENTERING THE SUMP.

PWR* Data Point Library Reference File Report Date : 06-24-2015 Page : 24 Date: 5/4/2015 Reactor Unit: CC2 Data Feeder: CC21 NRC ERDS Parameter: EFF GAS RAD Point ID: 2R54151 Plant Specific Point

Description:

WR EFF MONITOR Generic / Condition

Description:

RADIOACTIVITY OF RELEASED GASSES Analog I Digital: A ENGR Units / Digital States: UCI/SEC ENGR Units Conversion: N/A Minimum Instrument Range: 1E1 Maximum instrument Range: 1E13 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors:

How Processed: INVERSE LOG OF INSTRUMENT VALUE Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THE EFFLUENT GAS RADIATION MONITOR MEASURES MAIN VENT STACK EFFLUENT GROSS ACTIVITY. 3 CHANNELS: LOW, MEDIUM, & HIGH ARE USED TO PROVIDE AN OUTPUT TO A FOURTH PSEUDO CHANNEL. THE RANGE OF ACTIVITY DETECTED DETERMINES WHICH CHANNEL (L,M,H) IS SELECTED. THE OUTPUT OF THE FOURTH CHANNEL COMBINES GASIOUS FLOW WITH THE MEASURED ACTIVITY TO PROVIDE THE EFFECTIVE EFFLUENT GROSS ACTIVITY.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 25 Date: 5/4/2015 Reactor Unit: 002 Data Feeder: 0021 NRC ERDS Parameter: EFF LIQ RAD Point ID: 2SP6120 Plant Specific Point

Description:

LIQUID WASTE RAD Generic / Condition

Description:

RADIOACTIVITY OF RELEASED LIQUID Analog I Digital: A ENGR Units I Digital States: CPM ENGR Units Conversion: N/A Minimum instrument Range: 1E1 Maximum instrument Range: 1E6 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P N umber of Sensors: 3 How Processed: INVERSE LOG OF INSTRUMENT VALUE Sensor Locations N/A Alarm I Trip Setpoints: X >= 4.21 E5 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

LIQUID WASTE PROCESSING MONITORS THE COMMON DISCHARGE HEADER FROM REACTOR COOLANT WASTE PROCESSING AND MISC WASTE PROCESS. 50000 CPM WILL AUTOMATICALLY CLOSE 2 DISCHARGE VALVES 0-CV-2201 &0-CV-2202 TO ISOLATE FLOW TO THE CIRCULATION WATER DISCHARGE CONDUITS. ALARM LIMIT GIVEN IN ALARM/TRIP SET POINT IS THE SPDS ALARM LIMIT.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 26 Date: 5/4/2015 Reactor Unit: 002 Data Feeder: 0C21 NRC ERDS Parameter: COND A/E RAD Point ID: 2SP6117 Plant Specific Paint

Description:

OFF GAS RAD Generic / Condition

Description:

CONDENSER AIR EJECTOR RADIOACTIV Analog I Digital: A ENGR Units I Digital States: GPD ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 250 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 4 How Processed: REFERENCE UNIQUE SYSTEM DESCRIPTION Sensor Locations N/A Alarm I Trip Setpoints: X >= 5 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THE CONDENSER AIR EJECTOR DISCHARGE MONITOR INCLUDES FOUR RADIATION SENSORS. ONE SENSOR IS INSTALLED INTHE SUCTION SIDE OF EACH OF THE FOUR CONDENSER AIR REMOVAL PUMPS. OUTPUT SIGNALS ARE DISPLAYED INTHE CONTROL ROOM. THE AUCTIONEERED HIGH SIGNAL IS CONVERTED FROM CPM TO GALLONS PER DAY (GPO)

AND IS USED AS AN EARLY INDICATION OF A PRIMARY TO SECONDARY LEAK THROUGH THE S/G TUBES.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 27 Date: 5/4/2015 Reactor Unit: CC2 Data Feeder: CC21 NRC ERDS Parameter: CNTMNT RAD Paint ID: 2SP6121 Plant Specific Point

Description:

CNTMT RAD Generic I Condition

Description:

RADIATION LEVEL IN CONTAINMENT Analog I Digital: A ENGR Units /Digital States: R/H R ENGR Units Conversion: N/A Minimum Instrument Range:

Maximum Instrument Range: 1E8 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm I Trip Setpoints: X >=6 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THESE CONTAINMENT RADIATION MONITORS MEASURE GAMMA RADIATION LEVELS INCONTAINMENT UNDER ACCIDENT CONDITIONS.

THE DETECTORS ARE LOCATED AT THE 73-FOOT LEVEL AND ARE PLACED NEAR THE PRESSURIZER AND #21 STEAM GEN.

PWR Data Point Library Reference File Report Date : 06-24-20 15 Page : 28 Date: 5/4/2015 Reactor Unit: 002 Data Feeder: 0021 NRC ERDS Parameter: RCS LTDN RAD Point ID: 2R5202!

Plant Specific Point

Description:

PROCESS RAD MONITOR Generic I Condition

Description:

RAD LEVEL OF RCS LETDOWN LINE Analog I Digital: A ENGR Units / Digital States: KCPM ENGR Units Conversion: N/A Minimum Instrument Range: 1 E-2 Maximum Instrument Range: 1E3 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors: 1 How Processed: INVERSE LOG OF INSTRUMENT VALUE Sensor Locations N/A Alarm /Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THE CVCS LTDN RAD MONITOR IS INSTALLED IN THE LET DOWN LINE TO MONITOR GROSS REACTOR COOLANT ACTIVITY INDICATING A POTENTIAL FUEL ELEMENT FAILURE.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 29 Date: 5/4/2015 Reactor Unit: 002 Data Feeder: 0021 NRC ERDS Parameter: MAIN SL 1/A Point ID: 2R5421 !

Plant Specific Point

Description:

MAIN STM RAD LP 21 Generic / Condition

Description:

STM GEN 21 STEAM LINE RAD LEVEL Analog / Digital: A ENGR Units I Digital States: uCi/cc ENGR Units Conversion: N/A Minimum Instrument Range: 1 E-2 Maximum Instrument Range: 1 E5 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors: 1 How Processed: INVERSE LOG OF INSTRUMENT VALUE Sensor Locations N/A Alarm / Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FOR NOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARE LOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIV ROOM.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 30 Date: 5/4/2015 Reactor Unit: 002 Data Feeder: CC21 NRC EROS Parameter: MAIN SL 2/B Point ID: 2R5422!

Plant Specific Point

Description:

MAIN STM RAD LP 22 Generic I Condition

Description:

STM GEN 22 STEAM LINE RAD LEVEL Analog / Digital: A ENGR Units I Digital States: uCi/cc ENGR Units Conversion: N/A Minimum Instrument Range: 1 E-2 Maximum Instrument Range: 1 E5 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors:

How Processed: INVERSE LOG OF INSTRUMENT VALUE Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for OP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FOR NOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARE LOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIV ROOM.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 31 Date: 5/4/2015 Reactor Unit: CC2 Data Feeder: 0021 NRC ERDS Parameter: SG BD RAD 1A Point ID: 2R401 4!

Plant Specific Point

Description:

STM GEN BLOWDOWN ACTIVITY Generic / Condition

Description:

STM GEN 21 BLOWDOWN RAD LEVEL Analog / Digital: A ENGR Units I Digital States: CPM ENGR Units Conversion: N/A Minimum Instrument Range: 1E1 Maximum Instrument Range: 1E6 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors:

How Processed: INVERSE LOG OF INSTRUMENT VALUE Sensor Locations N/A Alarm / Trip Setpoints: X >= 5E4 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THIS DETECTOR MONITORS A SMALL PORTION OF THE STM GEN BLOWDOWN TO PROVIDE OPERATORS WITH AN EARLY INDICATION OF STM GEN U-TUBE LEAKAGE. ACTUATION OF THE HIGH ALARM AUTOMATICALLY SHUT THE SURFACE BLOWDOWN AND THE BOTTIOM BLOWDOWN ISOLATION VALVES. OF BOTH #11 & #12 STEAM GENERATORS THIS MONITOR IS INTHE LINE OF THE BLOWDOWN TANK AND IS COMMON TO BOTH STM GEN.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 32 Date: 5/4/2015 Reactor Unit: CC2 Data Feeder: CC21 NRC ERDS Parameter: CTMNT PRESS Paint ID: 2SP411 0 Plant Specific Point

Description:

CNTMT PRESSURE Generic / Condition

Description:

CONTAINMENT PRESSURE Analog / Digital: A ENGR Units I Digital States: PSIG ENGR Units Conversion: N/A Minimum Instrument Range: -5 Maximum Instrument Range: 150 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 3 How Processed: AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)

Sensor Locations N/A Alarm I Trip Setpoints: X >= 2.8 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THERE ARE A TOTAL OF 3 CONTAINMENT PRESSURE INDICATORS. TWO PROVIDE WIDE RANGE PRESSURE INDICATION, -5 TO +150 AND 0 TO 150 PSIG, FOR POST ACCIDENT MONITORING. THE THIRD INDICATOR IS A NARROW RANGE IND1CATION -5 TO +5 PSIG WHICH PROVIDES CONTAINMENT DIFFERENTIAL PRESSURE. ACTUATIONS OCCUR: CIS @

2.8 PSlG; CSAS @ 4.25 PSIG; SIAS @ 2.8 PSIG; RPS @ 2.4 PSlG.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 33 Date: 5/4/2015 Reactor Unit: CC2 Data Feeder: CC21 NRC ERDS Parameter: CTMNT TEMP Point ID: 2SP4tl 1 Plant Specific Point

Description:

CNTMT TEMPERATURE Generic / Condition

Description:

CONTAINMENT TEMPERATURE Analog I Digital: A ENGR Units / Digital States: D EGF ENGR Units Conversion: N/A Minimum Instrument Range: 50 Maximum Instrument Range: 300 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors: 2 How Processed: AVG OF TWO CHANNELS Sensor Locations N/A Alarm / Trip Setpoints: X >= 220 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

THERE ARE 2 CONTAINMENT TEMP DETECTORS. ONE MEASURES DOME TEMP, ANOTHER MEASURES THE REACTOR CAVITY TEMP. BOTH OF THESE PROVIDE INDICATION TO THE CONTROL ROOM OPERATORS.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 34 Date: 5/4/2015 Reactor Unit: 002 Data Feeder: 0021 NRC ERDS Parameter: BWST LEVEL Point ID: 2SP2RWLVL Plant Specific Point

Description:

REFUELING WATER TANK LEVEL Generic / Condition

Description:

BORATED WATER STORAGE TANK LEVEL Analog I Digital: A ENGR Units I Digital States: FEET ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 40 Zero Point

Reference:

TNKBOT Reference Point Notes RE:USD (REFERENCE UNIQ SYS DESC)

Proc or Sens: P Number of Sensors: 2 How Processed: WR SENSOR WHEN OUTSIDE NR SENSOR BAND Sensor Locations N/A Alarm / Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: WET Unique System

Description:

THE REFUELING WATER TANK SUPPLIES 2300-2700 PPM BORATED WATER TO THE SAFETY INJECTION SYSTEM AND ALSO SUPPLIES WATER FOR USE DURING REFUELING. TANK CAPACITY IS 420,000 GALS. AT 2.5 FEET THE SAFETY INJECTION LINE-UP IS SWITCHED TO THE RECIRCULATION MODE. THIS LEVEL IS EQUAL TO APPROX 10% OF TANK VOLUME.

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 35 Date: 5/4/2015 Reactor Unit: 002 Data Feeder: 0021 NRC ERDS Parameter: WIND SPEED Paint ID: 2WS60#15SM Plant Specific Point

Description:

WIND SPEED 60 METER 15 MINUTE AVG Generic I Condition

Description:

WIND SPEED AT REACTOR SITE Analog I Digital: A ENGR Units / Digital States: M/S ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 50 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors:

N/

How Processed:

N/A Sensor Locations Alarm /Trip Setpoints: X >= 22 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: LOW Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

WIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 60 METER ELEVATION

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 36 Date: 5/4/2015 Reactor Unit: CC2 Data Feeder: CC21 NRC ERDS Parameter: WIND DIR Point ID: 2WD60#15M Plant Specific Point

Description:

WIND DIRECTION 60 METER 15 MINUTE AVG Generic / Condition

Description:

WIND DIRECTION AT REACTOR SITE Analog I Digital: A ENGR Units!/ Digital States: DEG ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 360 Zero Point

Reference:

N/A Reference Paint Notes N/A Proc or Sens: S Number of Sensors:

N/

How Processed:

N/A Sensor Locations N/A Alarm I Trip Setpoints:

NI Detector Power N/A Supply Cut-Off Power Level:

NI Detector Power N/A Supply Turn-on Power Level:

Instrument Failure Mode: 0 DEGREES (NORTH)

Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

WIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER ON SITE. 60 METER ELEVATION

-w1 PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 37 Date: 5/4/2015 Reactor Unit: CC2 Data Feeder: 0021 NRC EROS Parameter: WIND SPEED Point ID: 2WS10#15M Plant Specific Point

Description:

WIND SPEED 10 METER 15 MINUTE AVG Generic / Condition

Description:

WIND SPEED AT REACTOR SITE Analog I Digital: A ENGR Units I Digital States: M/S ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 50 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors: 1 How Processed: N/A Sensor Locations N/A Alarm I Trip Setpoints: X >= 22 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: LOW Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

WIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 10 METER ELEVATION

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 38 Date: 5/4/2015 Reactor Unit: CC2 Data Feeder: CC21 NRC ERDS Parameter: WIND DIR Point ID: 2WD1 0#15M Plant Specific Point

Description:

WIND DIRECTION 10 METER 15 MINUTE AVG Generic / Condition

Description:

WIND DIRECTION AT REACTOR SITE Analog / Digital: A ENGR Units I Digital States: DEG ENGR Units Conversion: N/A Minimum Instrument Range: 0 Maximum Instrument Range: 360 Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: S Number of Sensors: 1 How Processed: N/A Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: 0 DEGREES (NORTH)

Temperature Compensation for OP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

WIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER ON SITE. 10 METER ELEVATION

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 39 Date: 5/4/2015 Reactor Unit: 002 Data Feeder: CC2 1 NRC EROS Parameter: ATMOSPHERIC STABILITY Point ID: 2MMS_DTASTB Plant Specific Point

Description:

WIND STABILITY BASED ON DELTA TEMP (A)

Generic 1 Condition

Description:

AIR STABILITY AT REACTOR SITE Analog / Digital: A ENGR Units I Digital States: N/A ENGR Units Conversion: N/A Minimum Instrument Range: 0 (A)

Maximum Instrument Range: 6 (G)

Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors:

How Processed: COMPLEX Sensor Locations N/A Alarm /Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for OP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

ATMOSPHERIC STABILITY BASED ON DELTA T (60 METER TEMPERATURE MINUS 10 METER TEMPERATURE, CHANNEL A). CALCULATED ON THE PLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITY CLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A, I=B, 2=C, 3=D, 4=E, 5=F, 6=G

PWR Data Point Library Reference File Report Date : 06-24-2015 Page : 40 Date: 5/4/2015 Reactor Unit: 002 Data Feeder: 0021 NRC ERDS Parameter: ATMOSPHERIC STABILITY Point ID: 2MMS_S60STB Plant Specific Point

Description:

60 METER WIND STABILITY - SIGMA-THETA Generic I Condition

Description:

AIR STABILITY AT REACTOR SITE Analog I Digital: A ENGR Units I Digital States: N/A ENGR Units Conversion: N/A Minimum Instrument Range: 0 (A)

Maximum Instrument Range: 6 (G)

Zero Point

Reference:

N/A Reference Point Notes N/A Proc or Sens: P Number of Sensors:

How Processed: COMPLEX Sensor Locations N/A Alarm I Trip Setpoints: N/A NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-on Power Level: N/A Instrument Failure Mode: N/A Temperature Compensation for DP Transmitters: N/A Level Reference Leg: N/A Unique System

Description:

ATMOSPHERIC STABILITY BASED ON SIGMA-THETA. CALCULATED ON THE PLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITY CLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A, 1=B, 2=C, 3=D, 4=E, 5=F, 6=G