ML15328A052: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15328A052
| number = ML15328A052
| issue date = 11/16/2015
| issue date = 11/16/2015
| title = Sequoyah, Unit 1 Cycle 21 and Unit 2 Cycle 20 Core Operating Limits Reports, Revision No. 1
| title = Cycle 21 and Unit 2 Cycle 20 Core Operating Limits Reports, Revision No. 1
| author name = Carlin J T
| author name = Carlin J
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee 37384-2000 November 16, 2015 10 CFR 50.4 ATTN: Document Controi Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328  
{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee 37384-2000 November 16, 2015 10 CFR 50.4 ATTN: Document Controi Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328


==Subject:==
==Subject:==
Sequoyah Unit I Cycle 21, and Unit 2 Cycle 20 Core Operating Limits Reports, Revision No. 1


==References:==
==References:==
: 1. Letter from NRC to TVA, "Sequoyah Nuclear Plant, Units 1 and 2
                          -  Issuance of Amendments for the Conversion to the Improved Technical Specifications with Beyond Scope Issues (TAC Nos.
MF3128 and MF3129)," dated September 30, 20015 (ML15238B460)
In accordance with Sequoyah Nuclear Plant (SQN) Units 1 and 2 Technical Specifications (TSs) 5.6.3.d, enclosed is the Unit 1 Cycle 21 Core Operating Limits Report (COLR), Revision 1, and Unit 2 Cycle 20OCOLR, Revision 1. In accordance with TSs 5.6.3.d, the COLRs are required to be provided to the Nuclear Regulatory Commission (NRC) within 30 days of issuance for each reload cycle. Sequoyah Units 1 and 2 were issued license amendment Nos. 334 and 327, respectively for improved standard TSs (Reference 1). These license amendments resulted in the revisions to each of the COLRs as discussed in Enclosure 1. The revised COLRs became effective on October 21, 2016.
There are no new regulatory commitments in this letter. If you have any questions, please contact Jonathan Johnson, SQN Site Licensing Manager at (423) 843-8129.
Soso


Sequoyah Unit I Cycle 21, and Unit 2 Cycle 20 Core Operating Limits Reports, Revision No. 1 1. Letter from NRC to TVA, "Sequoyah Nuclear Plant, Units 1 and 2-Issuance of Amendments for the Conversion to the Improved Technical Specifications with Beyond Scope Issues (TAC Nos.MF3128 and MF3129)," dated September 30, 20015 (ML1 5238B460)In accordance with Sequoyah Nuclear Plant (SQN) Units 1 and 2 Technical Specifications (TSs) 5.6.3.d, enclosed is the Unit 1 Cycle 21 Core Operating Limits Report (COLR), Revision 1, and Unit 2 Cycle 20OCOLR, Revision 1. In accordance with TSs 5.6.3.d, the COLRs are required to be provided to the Nuclear Regulatory Commission (NRC) within 30 days of issuance for each reload cycle. Sequoyah Units 1 and 2 were issued license amendment Nos. 334 and 327, respectively for improved standard TSs (Reference 1). These license amendments resulted in the revisions to each of the COLRs as discussed in Enclosure
U.S. Nuclear Regulatory Commission Page 2 November 16, 2015 Sequoyah Nuclear Plant Enclosures
: 1. The revised COLRs became effective on October 21, 2016.There are no new regulatory commitments in this letter. If you have any questions, please contact Jonathan Johnson, SQN Site Licensing Manager at (423) 843-8129.Soso U.S. Nuclear Regulatory Commission Page 2 November 16, 2015 Sequoyah Nuclear Plant Enclosures 1.2.3.Units 1 and 2 Core Operating Limits Report Changes Sequoyah Unit I Cycle 21 Core Operating Limits Report, Revision 1 Sequoyah Unit 2 Cycle 20 Core Operating Limits Report, Revision 1 ZTK: DVG Enclosures cc (Enclosures):
: 1.      Units 1 and 2 Core Operating Limits Report Changes
NRC Regional Administrator
: 2.      Sequoyah Unit I Cycle 21 Core Operating Limits Report, Revision 1
-Region II NRC Senior Resident Inspector
: 3.      Sequoyah Unit 2 Cycle 20 Core Operating Limits Report, Revision 1 ZTK: DVG Enclosures cc (Enclosures):
-SQN ENCLOSURE1I SEQUOYAH UNITS 1 AND 2 CORE OPERATING LIMITS REPORT CHANGES The following describes the changes made to each Units' Core Operating Limits Report (COLR), as result of the NRC review and approval of License Amendment Request for the conversion of the Sequoyah Technical Specification (TS) to Improved Standard Technical Specification, NUREG-1 431, Revision 4.1. Acronyms for All Rods Out (ARO) and Hot Zero THERMAL POWER (HZP) were removed from the COLRs.2. In Section 1.0, a table was added to assist user of the COLRs.3. Section 2.0 was updated to align the new TSs Reporting Requirements Section, 5.6.3,"Core Operating Limits Report".4. In Section 2.1 the Cycle-Specific Parameter Limits were relocated from the TSs to the COLRs. These parameters involve the Shutdown Margin requirements with references to the associated Limiting Condition for Operation (LCO).5. 60 ppm Moderator Temperature Coefficient limits were added in "Section 2.2 consistent with the NOTE in TSs LCO 3.1.3, "Moderator Temperature Coefficient," Surveillance Requirement 3.1.3.2.6. Control Bank Insertion Limits requirement were added in Section 2.4 as necessary for TSs LCO 3.1.6, "Control Bank Insertion Limits," Surveillance Requirements.
NRC Regional Administrator - Region II NRC Senior Resident Inspector - SQN
: 7. Section 2.5 was revised to add information relocated from previous TSs for consistency with approved TSs LCO 3.2.1, "Heat Flux Hot Channel Factor (Fq(X, Y, Z))".8. Section 2.6 was revised to add information relocated from previous TSs for consistency with approved TSs LCO 3.2.2, 'Nuclear Enthalpy Rise Hot Channel Factor F&H(X, Y)".9. Power Distribution Limits coefficient definitions, such as BQNOM and BHDES, were eliminated as these are defined in the TS Bases.10. The boron concentration limit for TSs LCO 3.9.1, 'Boron Concentration," were added to the COLRs consistent with the approved TVA License Amendment Request.
 
ENCLOSURE 2 SEQUOYAH UNIT 1 CYCLE 21 CORE OPERATING LIMITS REPORT REVISION 1 QA Record QA RcordL36 151009 802 SEQUOYAH UNIT 1 CYCLE 21 CORE OPERATING LIMITS REPORT REVISION 1 October 2015 Prepared by: Christine A. Setter, PWR Fuel Engineering Verified by: John E. Strange, P R Fuel Engineering Reviewed by:
ENCLOSURE1I SEQUOYAH UNITS 1 AND 2 CORE OPERATING LIMITS REPORT CHANGES The following describes the changes made to each Units' Core Operating Limits Report (COLR), as result of the NRC review and approval of License Amendment Request for the conversion of the Sequoyah Technical Specification (TS) to Improved Standard Technical Specification, NUREG-1 431, Revision 4.
unningham, PW Fue ngneig ManagerL radnS. Catalanotto, Reactor Engineering Manager Approved by: Date Date Date/ '&,/S Date Revision Pages affected All Reason for Revision:  
: 1. Acronyms for All Rods Out (ARO) and Hot Zero THERMAL POWER (HZP) were removed from the COLRs.
*Update for Improved Technical Specifications  
: 2. In Section 1.0, a table was added to assist user of the COLRs.
('ITS) Implementation SEQUOYAH-UNIT 1Pae1o16Rvsn1 Page 1 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 1.0 CORE OPERATING LIMITS REPORT This CORE OPERATING LIMITS REPORT (COLR) for Sequoyah Unit I Cycle 21 has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.3.The TSs affected by this Report are listed below: TS COLR COLR Section Technical Specification COLR Parameter Section Page 3.1.1 SHUTDOWN MARGIN (SDM) SDM 2.1 3 BOL MTC Limit 2.2.1 4 3.3 Moderator Temperature EOL MTC Limit "2.2.2 4 313 Coefficient (MTC) 300 ppm Surveillance Limit 2.2.3 4________________60 ppm Surveillance Limit 2.2.4 4 3.1.4 Rod Group Alignment Limits SDM 2.1.3 3 Shutdown Bank Insertion Limits 2.3 4 3.1.5 Shutdown Bank Insertion LimitsSD2.4 3 CotoS BnDnsrinMiit 2.14 5 3.1.6rConrolnBanknnsertion imitstSD 2.1. 3 3.1.8 PHYSICS TESTS Exceptions-SDM 2.1.6 3 MODE 2 -___________
: 3. Section 2.0 was updated to align the new TSs Reporting Requirements Section, 5.6.3, "Core Operating Limits Report".
__FQ 2.5.1 6 K(Z) 2.5.2 6 NSLOPEAFD 2.5.3 6 321 H eat Flux Hot Channel Factor PSLOPEAFD 2.5.4 6 321 (F 0 (X,Y,Z)) NSLOPEf 2 (Al) 2.5.5 6 PSLOPEf 2 (AI) 2.5.6 6 FQ(X,YZ) Appropriate Factor 2.5.7 6 ITS LCO 3.2.1 Required Action A.3 2.5.8 6 MAP(X,Y,Z) 2.6.1 6 RRH 2.6.2 6 Nuclear Enthalpy Rise Hot TRH2.3 6 3.2.2263 6 Channel Factor (FAH(XY))
: 4. In Section 2.1 the Cycle-Specific Parameter Limits were relocated from the TSs to the COLRs. These parameters involve the Shutdown Margin requirements with references to the associated Limiting Condition for Operation (LCO).
FAH(X,Y) Appropriate Factor 2.6.4 7 ITS 3.2.2 Required Action A.4 2.6.5 7 ITS 3.2.2 Required Action B.1 2.6.6 7 3.2.3 AXIAL FLUX DIFFERENCE AFD Limits 2.7 7 (AFD)___3.3.1 Reactor Trip System (RTS) QTNL, QTPL, QTNS, and QTPS 2.8.1 8 Instrumentation QPNL, QPPL, QPNS, and QPPS 2.8.2 9 3.9.1 Boron Concentration Refueling Boron Concentration 2.9 9 CORE OPERATING LIMITS Aayia ehd 5.6.3 REOT(OR nltclMtos2.0 3 SEQUOYAH-UNIT 1Pae2o16Rvsn1 Page 2 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.0 .OPERATING LIMITS The cycle-specific parameter limits for the TS listed in section 1 .0 are presented in the following subsections.
: 5. 60 ppm Moderator Temperature Coefficient limits were added in "Section 2.2 consistent with the NOTE in TSs LCO 3.1.3, "Moderator Temperature Coefficient," Surveillance Requirement 3.1.3.2.
These limits have been developed using the NRC approved methodologies specified in TS 5.6.3. The versions of the topical reports which describe the methodologies used for this cycle are listed in Table 1.The following abbreviations are used in this section: BOL stands for Beginning of Cycle Life EOL stands for End of Cycle Life RTP stands for RATED THERMAL POWER 2.1 SHUTDOWN MARGIN -SDM (TS 3.1 .1, 3.1.4, 3.1.5, 3.1.6, 3.1.8)2.1.1 For TS 3.1.1, SDM shall be ->1.6 %Ak/k in MODE 2 with keff < 1.0, MODE 3 and MODE 4*2.1.2 For TS 3.1.1, SDM shall be > 1.0 %Ak/k in MODE 5.2.1.3 For TS 3.1.4, SDM shall be > 1.6 %Ak/k in MODE 1 and MODE 2.2.1.4 For TS 3.1.5, SDM shall be >-1.6 %Ak/k in MODE 1 and MODE 2.2.1.5 For TS 3.1.6, SDM shall be --.1.6 %Alk/in MODE 1 and MODE 2 with keff> 1.0.2.1.6 For TS 3.1.8, SDM shall be _> 1.6 %Ak/k in MODE 2.SEQUOYAH-UNIT 1 ae3o 6Rvso Page 3 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.2 Moderator Temperature Coefficient  
: 6. Control Bank Insertion Limits requirement were added in Section 2.4 as necessary for TSs LCO 3.1.6, "Control Bank Insertion Limits," Surveillance Requirements.
-MTC (TS 3.1.3)2.2.1 The BOL MTC limit is: less positive than 2.2.2 The EOL MTC limit is: less negative than or equal to 2.2.3 The 300 ppm Surveillance limit is: less negative than or equal to 2.2.4 The 60 ppm Surveillance limit is: less negative than or equal to-0.05 x10-5 Ak/k/0 F.-4.50 x 10.4 Ak/k/&deg;F.-3.74 x 10-4 Ak/k/&deg;F.-4.15 xl10 Ak/k/0 F.2.3 Shutdown Bank Insertion Limits (TS 3.1.5)2.3.1 Each shutdown bank shall be withdrawn to a position as defined below: SEQUOYAH-UNIT 1 ae4o 6Rvso page 4 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.4 Control Bank Insertion Limits (TS 3.1.6)2.4.1 The control banks shall be limited in physical insertion as shown in Figure 1.2.4.2 Each cOntrol bank shall be considered fully withdrawn from the core at>__225 steps.2.4.3 The control banks shall be operated in sequence by withdrawal of Bank A, Bank B, Bank C, and Bank D. The control banks shall be sequenced in reverse order upon insertion.
: 7. Section 2.5 was revised to add information relocated from previous TSs for consistency with approved TSs LCO 3.2.1, "Heat Flux Hot Channel Factor (Fq(X, Y, Z))".
2.4.4 Each control bank not fully withdrawn from the core shall be operated with the following overlap as a function of full out position.Full Out Position (steps) Bank Overlap (steps) Bank Difference (steps)225 97 128 226 98 128 227 99 128 228 100 128 229 101 128 230 102 128 231 103 128 SEQUOYAH-UNIT 1 ae f16Rvso Page 5 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.5 Heat Flux Hot Channel Factor -FQ(X,Y,Z) (TS 3.2.1)2.5.1 FQRT- 2.62 2.5.2 K(Z) is provided in Figure 2 2.5.3 NSLOPEAFD  
: 8. Section 2.6 was revised to add information relocated from previous TSs for consistency with approved TSs LCO 3.2.2, 'Nuclear Enthalpy Rise Hot Channel Factor F&H(X, Y)".
= 1.21 2.5.4 PSLOPEAFD  
: 9. Power Distribution Limits coefficient definitions, such as BQNOM and BHDES, were eliminated as these are defined in the TS Bases.
= 1.55 2.5.5 NSLOPEf 2 (AI) = 1.48 2.5.6 PSLOPEf 2 (AI) = 2.00 2.5.7 The appropriate factor for increase in FQM(X,Y,Z) for compliance with SR 3.2.1.2 and SR 3.2.1.3 is specified as follows: For all cycle burn ups, use 2.0%2.5.8 ITS LCO 3.2.1 Required Action A.3 reduces the Overpower Delta T Trip setpoints (value of K<4) at least 1 % (in AT span) for each 1 % that FQC(x,Y,Z) exceeds its limit.2.6 Nuclear Enthalpy Rise Hot Channel Factor -FAH(X,Y) (TS 3.2.2)2.6.1 MAP(X,Y,Z) is provided in Table 2.2.6.2 RRH=3.34 when 0.8 <P<1.0 RRH=1.67 whenP<0.8 P = THERMAL POWER / RATED THERMAL POWER RRH = Thermal power reduction required to compensate for each 1% that FAH(X,Y) exceeds its limit.2.6.3 TRH = 0.0334 when 0.8 < P < 1.0 TRH = 0.0167 when P < 0.8 P = THERMAL POWER / RATED THERMAL POWER TRH = Reduction in Overtemperature Delta T K 1 setpoint required to compensate for each 1% that FAH(X,Y) exceeds its limit.SEQUOYAH-UNIT 1Pae6o16RvsnI Page 6 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.6.4 The appropriate factor for increase in FAHM (X,Y) for compliance with-SR 3.2.2.1 and SR 3.2.2.2 is specified as follows: For all cycle burnups, use 2.0%2.6.5 ITS 3.2.2 Required Action A.4 reduces the Overtemperature Delta T setpoint (K 1 term in Table 3.3.1-1) by > TRH multiplied by the FAH min margin.*2.6.6 ITS 3.2.2 Required Action B.1 reduces the Overtemperature Delta T setpoint (K 1 term in Table 3.3.1-1) by >- TRH multiplied by the f 1 (Al)min margin.2.7 AXIAL FLUX DIFFERENCE  
: 10. The boron concentration limit for TSs LCO 3.9.1, 'Boron Concentration," were added to the COLRs consistent with the approved TVA License Amendment Request.
-AFD (TS 3.2.3)2.7.1 The AFD limits are specified in Figure 3 SEQUOYAH-UNIT 1Pae7o16RvsnI Page 7 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.8 Reactor Trip System Instrumentation (TS *3.3.1)2.8.1 Trip Reset Term [f 1 (Al)] for Overtemperature Delta-T Trip*The following parameters are required to specify the power level-dependent f 1 (AI) trip reset term limits for Table 3.3.1-1 (function 6), Overtemperature Delta-T trip function: 2.8.1.1 QTNL = -20%where QTNL = the maximum negative Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
 
2.8.1.2 QTPL = +5%where QTPL = the maximum positive Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
ENCLOSURE 2 SEQUOYAH UNIT 1 CYCLE 21 CORE OPERATING LIMITS REPORT REVISION 1
2.8.1.3 QTNS = 2.50%where QTNS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QTNL).2.8.1.4 QTPS = 1.40%where QTPS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its positive limit at RATED THERMAL POWER (QTPL).SEQUOYAH-UNIT 1 ae8o 6Rvso Page 8 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.8.2 Trip Reset Term [f 2 (AI)] for Overpower Delta-T Trip The following parameters are required to specify the power level-dependent f 2 (AI) trip reset term limits for Table 3.3.1-1 (function 7), Overpower Delta-T trip function:*2.8.2.1 QPNL = -25%where QPNL = the maximum negative Al setpoint at RATED THERMAL *POWER at which the trip setpoint is not reduced by the axial power distribution.
 
2.8.2.2 QPPL = +25%where QPPL = the maximum positive Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
QA Record                                                                             QARcordL36 151009 802 SEQUOYAH UNIT 1 CYCLE 21 CORE OPERATING LIMITS REPORT REVISION 1 October 2015 Prepared by:
2.8.2.3 QPNS = 1.70%where QPNS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QPNL).2.8.2.4 QPPS = 1.70%where QPPS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al> exceeds its positive limit at RATED.THERMAL POWER (QPPL).2.9 Boron Concentration (TS 3.9.1)2.9.1 The refueling boron concentration shall be z 2080 ppm.SEQUOYAH-UNIT 1 ae9o 6Rvso Page 9 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 Table 1 COLR Methodology Topical Reports 1. BAW-10180-A, Revision 1, "NEMO-Nodal Expansion Method Optimized," March 1993.(Methodology for TS 3.1 .1-SHUTDOWN MARGIN, 3.1 .3-Moderator Temperature Coefficient, 3.9.1-Boron Concentration)
Christine A. Setter, PWR Fuel Engineering                                           Date Verified by:
: 2. BAW-10169P-A, Revision 0, "RSG Plant Safety Analysis-B&W Safety Analysis Methodology for Recirculating Steam Generator Plants," October 1989.(Methodology for TS 3.1 .3-Moderator Temperature Coefficient)
John E. Strange, P   R Fuel Engineering Reviewed by:
: 3. BAW-10163P-A, Revision 0, ."Core Operating Limit Methodology for Westinghouse-Designed PWRs," June 1989.(Methodology for TS 3.3.1-Reactor Trip System Instrumentation  
Date Kathl&*i',A  unningham, PW         Fuengneig ManagerL Date radnS. Catalanotto, Reactor Engineering Manager Approved by:
[f 1 (AI), f 2 (AI) limits], 3.1.5-Shutdown Bank Insertion Limits, 3.1.6-Control Bank Insertion Limits, 3.2.1-Heat F~lux Hot Channel Factor, 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.2.3-AXIAL FLUX DIFFERENCE)
                                                                            /   '&,/S Date Revision Pages affected     All Reason for Revision: *Update for Improved Technical Specifications ('ITS) Implementation SEQUOYAH-UNIT 1Pae1o16Rvsn1                   Page 1 of 16                                 Revision 1
: 4. EMF-2328(P)(A), "PWR Small Break LOCA Evaluation Model,"' March 2001.(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)5. BAW-10227P-A, Revision 1, "Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel," June 2003.(Methodology for TS 3.2.1-Hleat Flux Hot Channel Factor)6. BAW-10186P-A, Revision 2, "Extended Burnup Evaluation," June 2003.(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)7. EMF-2103P-A, Revision 0, "Realistic Large Break LOCA Methodology for Pressurized Water Reactors,".
 
April 2003.(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)8. BAW-1 0241 P-A, Revision 1, "BHTP DNB Correlation Applied with LYNXT," July 2005.(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation  
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 1.0       CORE OPERATING LIMITS REPORT This CORE OPERATING LIMITS REPORT (COLR) for Sequoyah Unit I Cycle 21 has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.3.
[f 1 (AI) limits])9. BAW-10199P-A, Revision 0, "The BWU Critical Heat Flux Correlations," August 1996.(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation  
The TSs affected by this Report are listed below:
[f 1 (AI) limits])10. BAW-10189P-A, "CHF Testing and Analysis of the Mark-BW Fuel Assembly Design," January 1996.(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation  
TS                                                                                   COLR COLR Section         Technical Specification                       COLR Parameter             Section Page 3.1.1     SHUTDOWN MARGIN (SDM)                     SDM                                   2.1   3 BOL MTC Limit                       2.2.1   4 3.3 Moderator Temperature                     EOL MTC Limit             "2.2.2             4 313 Coefficient (MTC)                         300 ppm Surveillance Limit           2.2.3   4
[f 1 (AI) limits])1 1. BAW-10159P-A, "BWCMV Correlation of Critical Heat Fluxin Mixing Vane Grid Fuel Assemblies," August .1990.(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation  
________________60                  ppm Surveillance Limit           2.2.4   4 3.1.4     Rod Group Alignment Limits               SDM                                 2.1.3   3 Shutdown Bank Insertion Limits         2.3   4 3.1.5     Shutdown Bank Insertion LimitsSD2.4                                                   3 CotoS BnDnsrinMiit                   2.14   5 3.1.6rConrolnBanknnsertion imitstSD                                           2.1. 3 3.1.8     PHYSICS TESTS Exceptions-               SDM                                 2.1.6   3 MODE 2                       -___________                                       __
[f 1 (AI) limits])12. BAW-10231P-A, Revision 1, "COPERNIC Fuel Rod Design Computer Code," January 2004.(Methodology for TS 3.3.1-Reactor Trip System Instrumentation  
FQ                                  2.5.1   6 K(Z)                                 2.5.2   6 NSLOPEAFD                           2.5.3   6 321 Heat Flux Hot Channel Factor             PSLOPEAFD                           2.5.4   6 321 (F0 (X,Y,Z))                             NSLOPEf 2 (Al)                       2.5.5   6 PSLOPEf 2 (AI)                       2.5.6   6 FQ(X,YZ) Appropriate Factor         2.5.7   6 ITS LCO 3.2.1 Required Action A.3   2.5.8   6 MAP(X,Y,Z)                           2.6.1   6 RRH                                 2.6.2   6 Nuclear Enthalpy Rise Hot                 TRH2.3                                       6 3.2.2263 Channel Factor (FAH(XY))                   FAH(X,Y) Appropriate Factor                 6 2.6.4   7 ITS 3.2.2 Required Action A.4       2.6.5   7 ITS 3.2.2 Required Action B.1       2.6.6   7 3.2.3     AXIAL FLUX DIFFERENCE                     AFD Limits                           2.7   7 (AFD)___
[f 2 (AI) limits])-SEQUOYAH-UNIT 1 ae1 f16Rvso Page 10 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 Table 2 Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation (TS 3.2.2)AXlAL(X,Y)
3.3.1     Reactor Trip System (RTS)                 QTNL, QTPL, QTNS, and QTPS           2.8.1   8 Instrumentation                           QPNL, QPPL, QPNS, and QPPS           2.8.2   9 3.9.1     Boron Concentration                       Refueling Boron Concentration         2.9   9 5.6.3     CORE REOT(OR OPERATING LIMITS                Aayia        ehd nltclMtos2.0                               3 SEQUOYAH-UNIT 1Pae2o16Rvsn1Page 2 of 16                                                 Revision 1
ELEVATION (ft) MAP(X,Y,Z) 1 1.8128 2 1.8125 3 1.8122.4 1.8119 5 1.8115 1.1 6 1.8109 7 1.8106 8 1.8104 9 1.8098 10 1.8092 11 1.7599 1 2.0671 2 2.0664 3 2.0656 4 2.0649 5 2.0642 1.2 6 2.0636 7 2.0624 8 2.0615 9 2.0457 10 1.9492 11 -1.8589 1 2.3433 2 2.3419 3 2.3412 4 2.3397 5 2.3389 1.3 6 2.3381 7 2.3357 8 2.3130 9 2.1886 10 2.0643______11 1.9439 AXIAL(X,Y)
 
ELEVATION (ft) MAP(X,Y,Z) 1 2.5969 2 2.5380 3 2.4827 4 2.4411 5 2.4315 1.4 6 2.4800 7 2.5356 8 2.4447 9 2.3555 10 2.1738 11 2.0238 1 2.6723 2 2.6061 3 2.5417 4 2.4913 5 2.4801 1.5 6 2.5380 7 2.6273 8 2.5311 9 2.4447 10 2.2772 11 2.0975 1 2.7308 2 2.6605 3 2.5947 4 2.5371 5 2.5234 1.6 6 2.5906 7 2.7077 8 2.6117 9 2.5240 10 2.3758 11 2.1662 SEQUOYAH-UNIT 1 ae1 f16Rvso Page 11 of 16 Revision 1 TableFO 2EU A Uont in CYCEd 2 Table 2 (continued)
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.0   .OPERATING LIMITS The cycle-specific parameter limits for the TS listed in section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in TS 5.6.3. The versions of the topical reports which describe the methodologies used for this cycle are listed in Table 1.
AXIAL(X,Y)
The following abbreviations are used in this section:
ELEVATION(ft)
BOL stands for Beginning of Cycle Life EOL stands for End of Cycle Life RTP stands for RATED THERMAL POWER 2.1     SHUTDOWN MARGIN         - SDM (TS 3.1 .1, 3.1.4, 3.1.5, 3.1.6, 3.1.8) 2.1.1   For TS 3.1.1, SDM shall be ->1.6%Ak/k in MODE 2 with keff < 1.0, MODE 3 and MODE 4
MAP(X,Y,Z) 1 2.7664 2 2.7083 3 2.6380 4 2.5791 5 2.5639 1.7 6 2.6359 7 2.7795 8 2.6870 9 " 2.5798 10 2.4726 11 2.2304 1 2.7963 2 2.7466 3 2.6775 4 2.6172 5 2.6010 1.8 6 2.6802 7 2.8456 8 2.7552 9 2.6648 10 2.5655 11 2.2931 1 2.8235 2 2.7739 3 2.7125 4 2.6523 5 2.6328 1.9 6 2.7200 7 2.9065 8 2.8193 9 2.7288 10 2.6384______11 2.3482 AXIAL(X,Y)
        *2.1.2   For TS 3.1.1, SDM shall be > 1.0 %Ak/k in MODE 5.
ELEVATION (if) MAP(X,Y,Z) 1 2.4339 2 2.4060 3 2.3856 4 2.3423 5 2.3114>1.9 6 2.6006 7 2.5003 8 2.4004 9 2.2989 10 2.1483 11 .1.9630 1 2.5057 2 2.4754 3 2.4449 4 2.3591 5 2.4205 2.1 6 2.7643 7 2.6474 8 2.5360 9 2.4400 10 2.3277 11 2.0549 1 2.5380 2 2.5216 3 2.4619 4 2.4294 5 2.4290 2.3 6 2.8222 7 2.7334 8 2.6234 9 2.5186 10 2.4215_____11 2.1250 SEQUOYAH-UNIT I1ae1 f16Rvso Page 12 of 16 Revision 1 TableFO 2EU A UcnItin CYCEd 2 Table 2 (continued)
2.1.3   For TS 3.1.4, SDM shall be > 1.6 %Ak/k in MODE 1 and MODE 2.
AXIAL(X,Y)
2.1.4   For TS 3.1.5, SDM shall be >-1.6 %Ak/k in MODE 1 and MODE 2.
ELEVATION (ft) MAP(X,Y,Z) 1 2.6440 2 2.5160 3 2.5045 4 2.4488 5 2.5803 2.5 6 2.9481 7 2.8544 8 2.7286 9 2.6450 10 2.5527 11 2.1731 1 2.5554 2 2.5529 3 2.5197 4 2.4375 5 2.5643 2.7 6 2.9839 7 2.8837 8 2.7939 9 2.7040 10 2.5997 11 2.1995 1 2.4223 2 2.5653 3 2.5075 4 2.3955 5 2.7295 2.9 6 3.0921 7 3.0070 8 2.8896 9 2.8058 10 2.6974_____11 2.2039 AXIAL(X,Y)
2.1.5   For TS 3.1.6, SDM shall be --.1.6 %Alk/
ELEVATION (ft) MAP(X,Y,Z) 1 2.2448 2 2.5535 3 2.4678 4 2.3229 5 2.8913 3.1 6 3.1515 7 3.0181 8 2.9699 9 2.8941 10 2.7819 11 2.1866 1 2.0228 2 2.5172 3 2.4007 4 2.2195 5 3.0496 3.3 6 3.2226 7 3.1446 8 3.0350 9 2.9688 10 2.8533 11 2.1473 1 1.7563 2 2.4566 3 2.3062 4 2.0854 5 3.2045 3.5 6 3.2929 7 3.2627 8 3.0846 9 3.0299* 10 2.9117_____11 2.0862 SEQUOYAH-UNIT 1 Pg 3o 6Rvso Page 13 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 231 220(FuI~y Withdn~wn Regior~ (575~225)p --'Inn I 0-Cl)rm 0/ ABANK D 820 400 20 __ _ _ _ _40 (Fully Inserted)0.2 0.4 0.6 0_8 I Fraction of RATED THERMAL POWER FIGURE 1 Rod Bank Insertion Limits Versus THERMAL POWER, Four Loop Operation (TS 3.1.6)* Fully withdrawn region shall be the condition where shutdown and control banks are at a position within the interval of 225 and <231 steps withdrawn, inclusive.
in MODE 1 and MODE 2 with keff> 1.0.
Fully withdrawn shall be the position as defined below Cycle Burnup (MWd/mtU)>0 Steps Withdrawn-> 225 to < 231 This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.
2.1.6   For TS 3.1.8, SDM shall be _>1.6 %Ak/k in MODE 2.
If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1 .3% in power, and the rod insertion limit lines must be increased by 3 steps withdrawn until the LEFM is returned to operation.
SEQUOYAH-UNIT 1                     ae3o Page        6Rvso 3 of 16                         Revision 1
SEQUOYAH-UNIT 1 ae1 f16Rvso Page 14 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 1.2 1.0 0.8 0.6 0.4 0.2 0.0 Eeaio K Iz)( )0.00 1000 6,25 1000\ I I i I Elvaio K!z 0 2 4 6-Core Height (Feet)8 10 12 FIGURE 2 K(Z) -Normalized FQ(X,Y,Z) as a Function of Core Height (TS 3.2.1)SEQUOYAH-UNIT 1 Page 15 of 16 Rvso Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 a.0 0 0.'I I-a'U II-0 120 110 100 90 80 70 60 50 40 30 20 10 0 I II I I (710) UnaccieptableI_
 
--hOpe rationI-_ -. I_S I I 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 I q]I I L I I I' ! i '-50-40 20 -10 0 10 20 30 Flux Difference (Al) %FIGURE 3 AXIAL FLUX DIFFERENCE Limits As A Function of RATED THERMAL POWER For Burnup Range 0 EFPD to EOL (TS 3.2.3)40 50 This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.2   Moderator Temperature Coefficient     - MTC (TS 3.1.3) 2.2.1   The BOL MTC limit is: ,*
less positive than                 -0.05 x10-5 Ak/k/ 0 F.
2.2.2   The EOL MTC limit is:
less negative than or equal to     -4.50 x 10.4 Ak/k/&deg;F.
2.2.3   The 300 ppm Surveillance limit is:
less negative than or equal to     -3.74 x 10-4 Ak/k/&deg;F.
2.2.4   The 60 ppm Surveillance limit is:
less negative than or equal to     -4.15 xl10  Ak/k/0 F.
2.3   Shutdown Bank Insertion Limits (TS 3.1.5) 2.3.1   Each shutdown bank shall be withdrawn to a position as defined below:
SEQUOYAH-UNIT 1                 ae4o page        6Rvso 4 of 16                         Revision 1
 
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.4   Control Bank Insertion Limits (TS 3.1.6) 2.4.1     The control banks shall be limited in physical insertion as shown in Figure 1.
2.4.2     Each cOntrol bank shall be considered fully withdrawn from the core at>__225 steps.
2.4.3     The control banks shall be operated in sequence by withdrawal of Bank A, Bank B, Bank C, and Bank D. The control banks shall be sequenced in reverse order upon insertion.
2.4.4     Each control bank not fully withdrawn from the core shall be operated with the following overlap as a function of full out position.
Full Out Position (steps)     Bank Overlap (steps)       Bank Difference (steps) 225                         97                           128 226                         98                           128 227                         99                           128 228                         100                           128 229                         101                           128 230                         102                           128 231                         103                           128 SEQUOYAH-UNIT 1                     ae 5 off16Rvso Page     16                           Revision 1
 
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.5   Heat Flux Hot Channel Factor - FQ(X,Y,Z) (TS 3.2.1) 2.5.1   FQRT-         2.62 2.5.2   K(Z) is provided in Figure 2 2.5.3   NSLOPEAFD =         1.21 2.5.4   PSLOPEAFD =         1.55 2.5.5   NSLOPEf2 (AI) =     1.48 2.5.6   PSLOPEf 2(AI) =     2.00 2.5.7   The appropriate factor for increase in FQM(X,Y,Z) for compliance with SR 3.2.1.2 and SR 3.2.1.3 is specified as follows:
For all cycle burn ups, use 2.0%
2.5.8   ITS LCO 3.2.1 Required Action A.3 reduces the Overpower Delta T Trip setpoints (value of K< 4) at least 1% (in AT span) for each 1% that FQC(x,Y,Z) exceeds its limit.
2.6   Nuclear Enthalpy Rise Hot Channel Factor - FAH(X,Y) (TS 3.2.2) 2.6.1   MAP(X,Y,Z) is provided in Table 2.
2.6.2   RRH=3.34       when 0.8 <P<*1.0 RRH=1.67         whenP<0.8 P = THERMAL POWER / RATED THERMAL POWER RRH = Thermal power reduction required to compensate for each 1% that FAH(X,Y) exceeds its limit.
2.6.3   TRH = 0.0334 when 0.8 < P < 1.0 TRH = 0.0167 when P < 0.8 P = THERMAL POWER / RATED THERMAL POWER TRH = Reduction in Overtemperature Delta T K1 setpoint required to compensate for each 1% that FAH(X,Y) exceeds its limit.
SEQUOYAH-UNIT 1Pae6o16RvsnIPage 6 of 16                               Revision 1
 
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.6.4   The appropriate factor for increase in FAHM (X,Y) for compliance with-SR 3.2.2.1 and SR 3.2.2.2 is specified as follows:
For all cycle burnups, use 2.0%
2.6.5   ITS 3.2.2 Required Action A.4 reduces the Overtemperature Delta T setpoint (K1 term in Table 3.3.1-1) by > TRH multiplied by the FAH min margin.
      *2.6.6   ITS 3.2.2 Required Action B.1 reduces the Overtemperature Delta T setpoint (K1 term in Table 3.3.1-1) by >-TRH multiplied by the f1(Al) min margin.
2.7   AXIAL FLUX DIFFERENCE       - AFD (TS 3.2.3) 2.7.1   The AFD limits are specified in Figure 3 SEQUOYAH-UNIT 1Pae7o16RvsnIPage 7 of 16                             Revision 1
 
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.8   Reactor Trip System Instrumentation (TS *3.3.1) 2.8.1       Trip Reset Term [f1(Al)] for Overtemperature Delta-T Trip
      *The following parameters are required to specify the power level-dependent f1(AI) trip reset term limits for Table 3.3.1-1 (function 6), Overtemperature Delta-T trip function:
2.8.1.1     QTNL = -20%
where QTNL     =   the maximum negative Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
2.8.1.2     QTPL = +5%
where QTPL     =   the maximum positive Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
2.8.1.3   QTNS   = 2.50%
where QTNS     =   the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QTNL).
2.8.1.4   QTPS   = 1.40%
where QTPS     =   the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its positive limit at RATED THERMAL POWER (QTPL).
SEQUOYAH-UNIT 1                     ae8o Page     8 of 166Rvso                    Revision 1
 
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.8.2       Trip Reset Term [f2 (AI)] for Overpower Delta-T Trip The following parameters are required to specify the power level-dependent f2(AI) trip reset term limits for Table 3.3.1-1 (function 7),
Overpower Delta-T trip function:
          *2.8.2.1     QPNL = -25%
where QPNL   = the maximum negative Al setpoint at RATED THERMAL *POWER at which the trip setpoint is not reduced by the axial power distribution.
2.8.2.2     QPPL = +25%
where QPPL   = the maximum positive Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
2.8.2.3     QPNS   = 1.70%
where QPNS     = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QPNL).
2.8.2.4     QPPS = 1.70%
where QPPS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al
                                    > exceeds its positive limit at RATED.THERMAL POWER (QPPL).
2.9   Boron Concentration (TS 3.9.1) 2.9.1       The refueling boron concentration shall be z 2080 ppm.
SEQUOYAH-UNIT 1                     ae9o Page   9 of 166Rvso                    Revision 1
 
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 Table 1 COLR Methodology Topical Reports
: 1. BAW-10180-A, Revision 1, "NEMO-Nodal Expansion Method Optimized," March 1993.
(Methodology for TS 3.1 .1-SHUTDOWN MARGIN, 3.1 .3-Moderator Temperature Coefficient, 3.9.1-Boron Concentration)
: 2. BAW-10169P-A, Revision 0, "RSG Plant Safety Analysis-B&W Safety Analysis Methodology for Recirculating Steam Generator Plants," October 1989.
(Methodology for TS 3.1 .3-Moderator Temperature Coefficient)
: 3. BAW-10163P-A, Revision 0, ."Core Operating Limit Methodology for Westinghouse-Designed PWRs," June 1989.
(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f1 (AI), f2(AI) limits],
3.1.5-Shutdown Bank Insertion Limits, 3.1.6-Control Bank Insertion Limits, 3.2.1-Heat F~lux Hot Channel Factor, 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.2.3-AXIAL FLUX DIFFERENCE)
: 4. EMF-2328(P)(A), "PWR Small Break LOCA Evaluation Model,"' March 2001.
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
: 5. BAW-10227P-A, Revision 1, "Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel," June 2003.
(Methodology for TS 3.2.1-Hleat Flux Hot Channel Factor)
: 6. BAW-10186P-A, Revision 2, "Extended Burnup Evaluation," June 2003.
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
: 7. EMF-2103P-A, Revision 0, "Realistic Large Break LOCA Methodology for Pressurized Water Reactors,". April 2003.
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
: 8. BAW-1 0241 P-A, Revision 1, "BHTP DNB Correlation Applied with LYNXT," July 2005.
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])
: 9. BAW-10199P-A, Revision 0, "The BWU Critical Heat Flux Correlations," August 1996.
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])
: 10. BAW-10189P-A, "CHF Testing and Analysis of the Mark-BW Fuel Assembly Design,"
January 1996.
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])
1 1. BAW-10159P-A, "BWCMV Correlation of Critical Heat Fluxin Mixing Vane Grid Fuel Assemblies," August .1990.
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])
: 12. BAW-10231P-A, Revision 1, "COPERNIC Fuel Rod Design Computer Code," January 2004.
(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f2 (AI) limits])-
SEQUOYAH-UNIT 1                     ae110 off16Rvso Page           16                       Revision 1
 
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 Table 2 Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation (TS 3.2.2)
AXlAL(X,Y)   ELEVATION (ft) MAP(X,Y,Z)        AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) 1           1.8128                           1          2.5969 2           1.8125                           2          2.5380 3           1.8122.                         3          2.4827 4           1.8119                           4          2.4411 5           1.8115                           5          2.4315 1.1             6           1.8109             1.4          6          2.4800 7           1.8106                           7          2.5356 8           1.8104                           8          2.4447 9           1.8098                           9          2.3555 10           1.8092                         10          2.1738 11           1.7599                         11          2.0238 1           2.0671                           1          2.6723 2           2.0664                           2          2.6061 3           2.0656                           3          2.5417 4           2.0649                           4          2.4913 5           2.0642                           5          2.4801 1.2             6           2.0636             1.5          6          2.5380 7           2.0624                           7          2.6273 8           2.0615                           8          2.5311 9           2.0457                           9          2.4447 10           1.9492                         10          2.2772 11         - 1.8589                         11          2.0975 1           2.3433                           1          2.7308 2           2.3419                         2          2.6605 3           2.3412                           3          2.5947 4           2.3397                         4          2.5371 5           2.3389                         5          2.5234 1.3             6           2.3381             1.6          6          2.5906 7           2.3357                         7          2.7077 8           2.3130                           8          2.6117 9           2.1886                           9          2.5240 10           2.0643                          10          2.3758
______11                    1.9439                         11          2.1662 SEQUOYAH-UNIT 1                    ae111 off16Rvso Page        16                    Revision 1
 
Uont in    CYCEd2 2EUA TableFO Table 2 (continued)
AXIAL(X,Y) ELEVATION(ft) MAP(X,Y,Z)      AXIAL(X,Y)      ELEVATION (if) MAP(X,Y,Z) 1       2.7664                                1          2.4339 2       2.7083                                2          2.4060 3        2.6380                                3           2.3856 4        2.5791                                4           2.3423 5        2.5639                                5           2.3114 1.7            6       2.6359              >1.9             6          2.6006 7        2.7795                                7          2.5003 8        2.6870                                8          2.4004 9    "  2.5798                                9          2.2989 10        2.4726                              10          2.1483 11        2.2304                              11    .      1.9630 1        2.7963                                1          2.5057 2        2.7466                                2          2.4754 3        2.6775                                3          2.4449 4        2.6172                              4          2.3591 5        2.6010                                5          2.4205 1.8            6        2.6802              2.1             6          2.7643 7        2.8456                                7         2.6474 8       2.7552                                8          2.5360 9        2.6648                              9          2.4400 10        2.5655                              10         2.3277 11        2.2931                              11         2.0549 1       2.8235                                1         2.5380 2         2.7739                              2          2.5216 3        2.7125                              3          2.4619 4        2.6523                              4           2.4294 5        2.6328                              5           2.4290 1.9          6         2.7200              2.3            6          2.8222 7        2.9065                              7          2.7334 8        2.8193                              8          2.6234 9        2.7288                              9          2.5186 10        2.6384                              10          2.4215
______11                2.3482                _____11                    2.1250 SEQUOYAH-UNIT I1ae1          Page 12 off16Rvso 16                        Revision 1
 
2 2EUA    UcnItinCYCEd TableFO Table 2 (continued)
AXIAL(X,Y)  ELEVATION (ft) MAP(X,Y,Z)      AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) 1         2.6440                            1          2.2448 2        2.5160                            2         2.5535 3         2.5045                            3          2.4678 4        2.4488                          4          2.3229 5        2.5803                            5          2.8913 2.5            6        2.9481            3.1           6          3.1515 7        2.8544                            7          3.0181 8        2.7286                            8          2.9699 9        2.6450                            9          2.8941 10        2.5527                          10          2.7819 11        2.1731                          11          2.1866 1        2.5554                            1          2.0228 2        2.5529                            2          2.5172 3        2.5197                            3         2.4007 4        2.4375                          4           2.2195 5        2.5643                            5         3.0496 2.7            6        2.9839            3.3            6         3.2226 7        2.8837                            7         3.1446 8         2.7939                            8          3.0350 9        2.7040                            9         2.9688 10        2.5997                          10         2.8533 11        2.1995                          11          2.1473 1        2.4223                            1          1.7563 2         2.5653                          2          2.4566 3        2.5075                          3           2.3062 4         2.3955                          4          2.0854 5        2.7295                          5           3.2045 2.9            6        3.0921            3.5          6          3.2929 7          3.0070                          7          3.2627 8         2.8896                          8          3.0846 9         2.8058                          9          3.0299 10         2.6974
* 10          2.9117
_____11                2.2039              _____11                  2.0862 SEQUOYAH-UNIT 1              Pg 13 Page    3oof 16 6Rvso                Revision 1
 
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 231
{Fu]* %%%hdr'a*.* RegiGn)*                (.575*225}
220                      p Regior~
(FuI~y Withdn~wn                -        (575~225)
                'Inn I 14160/'*B 0-
                                                  /      ABANK                            D Cl) 820 rm 0
400 20                                                                          __ _  _ _ _
40 0.2               0.4              0.6           0_8            I (Fully Inserted)
Fraction of RATED THERMAL POWER FIGURE 1 Rod Bank Insertion Limits Versus THERMAL POWER, Four Loop Operation (TS 3.1.6)
* Fully withdrawn region shall be the condition where shutdown and control banks are at a position within the interval of &#x17d;225 and <231 steps withdrawn, inclusive.
Fully withdrawn shall be the position as defined below Cycle Burnup (MWd/mtU)                                Steps Withdrawn
                        >0                                            ->225 to < 231 This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.
If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the rod insertion limit lines must be increased by 3 steps withdrawn until the LEFM is returned to operation.
SEQUOYAH-UNIT 1                                  ae114 off16Rvso Page      16                            Revision 1
 
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 1.2 1.0 Eeaio        K        Iz) 0.8
(         )
0.00    1000 6,25  1000 0.6
                                \                        I 0.4                                        I i
I Elvaio          K!z 0.2 0.0 0        2               4            6-      8   10         12 Core Height (Feet)
FIGURE 2 K(Z) - Normalized FQ(X,Y,Z) as a Function of Core Height (TS 3.2.1)
SEQUOYAH-UNIT 1                    Page 15 of 16                Revision 1 Rvso
 
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 120                  COLR FOR SEQUOYAH UNIT 1 CYCLE 21 I          II      I        I 110 100 (710) UnaccieptableI_
90
                                                              -        -  hOpe rationI a.
0  80 0
0.
70                                            -        _                                                                            -. I_
          'I 60 I-a'U  50 II-0  40 30
                              ]
I       q            L I
20           I                    I S I        I1 10 I                    I 0                               '      !      i      '
                    -50    -40    -30    -20    -10      0     10      20    30    40    50 Flux Difference (Al) %
FIGURE 3 AXIAL FLUX DIFFERENCE Limits As A Function of RATED THERMAL POWER For Burnup Range 0 EFPD to EOL (TS 3.2.3)
This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.
If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the AFD limit lines must be made more restrictive by 1% in AFD until the LEFM is returned to operation.
If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the AFD limit lines must be made more restrictive by 1% in AFD until the LEFM is returned to operation.
SEQUOYAH-UNIT 1 Pg 6o 6Rvso Page 16 of 16 Revision 1 ENCLOSURE 3 SEQUOYAH UNIT 2 CYCLE 20 CORE OPERATING LIMITS REPORT REVISION 1 QA Record QA RcordL36 151009 803 SEQUOYAH UNIT 2 CYCLE 20 CORE OPERATING LIMITS REPORT REVISION I October 2015 Prepared by: Christine A. Setter, PWR Fuel Engineering Date Verified by:/P,5R Fuel Engineering DatO! e Reviewed by: K PWR Fuel Engineering Manager Date Brandon S. Catalanotto, Reactor Engineering Manager Date/ /Approved by: PORC Chairman Date Plant Manager 'Date Revision .._1 Pages affected All Reason for Revision:
SEQUOYAH-UNIT 1                           Pg 166oof 16 Page          6Rvso                         Revision 1
Update for Improved Technical Specifications (ITS) Implementation SEQUOYAH-UNJT 2Pae1o17Rvsn1 Page 1 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 1.0 CORE OPERATING LIMITS REPORT This CORE OPERATING LIMITS REPORT (COLR) for Sequoyah Unit 2 Cycle 20 has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.3.The TSs affected by this Report are listed below: TS COLR COLR Section Technical Specification COLR Parameter Section Page 3.1.1 SHUTDOWN MARGIN (SDM) SDM 2.1 3 BOL MTC Limit 2.2.1 4 313 Moderator Temperature EOL MTC Limit 2.2.2 4 Coefficient (MTC) 300Oppm Surveillance Limit 2.2.3 4 60 ppm Surveillance Limit 2.2.4 4 3.1.4 Rod Group Alignment Limits SDM 2.1.3 3 Shutdown Bank Insertion Limits 2.3 4 3.1.5 Shutdown Bank Insertion LimitsSD214 3 CotoS anDnetinLmt 2..4 5 3.1.6rCntrolnBnkIInsetionnLiitsiSs 2.14 3 3.1.8 PHYSICS TESTS Exceptions  
 
-SDM 2.1.6 3 MODE 2 FTP 2.5.1 6 K(Z) 2.5.2 6 NSLOPEAFD 2.5.3 6 321 Heat Flux Hot ChanneiFactor PSLOPEAFD 2.5.4 6 (F 0 (X,Y,Z)) NSLOPEf 2 (AI) 2.5.5 6 PSLOPEf 2 (AI) 2.5.6 6 FQ(X,Y,Z)
ENCLOSURE 3 SEQUOYAH UNIT 2 CYCLE 20 CORE OPERATING LIMITS REPORT REVISION 1
Appropriate Factor 2.5.7 6___________________ITS LCO 3.2.1 Required Action A.3 2.5.8 6 MAP(X,Y,Z) 2.6.1 6 RRH 2.6.2 6 322 Nuclear Enthalpy Rise Hot TRH 2.6.3 6 Channel Factor (FAH(X,Y))
 
FAH(X,Y) Appropriate Factor 2.6.4 7 ITS 3.2.2 Required Action A.4 2.6.5 7 ITS 3.2.2 Required Action B.1 2.6.6 7 323 AXIAL FLUX DIFFERENCE AOLmt .(AFD) _ _ _ _ _ _ _ _ _ _ _331 Reactor Trip System (RTS) QTNL, QTPL, QTNS, and QTPS 2.8.1 8 Instrumentation QPNL, QPPL, QPNS, and QPPS 2.8.2 9 3.9.1 Boron Concentration Refueling Boron Concentration 2.9 9 CORE OPERATING LlMITS Aayia ehd 5.6.3 REOT(OR nltclMtos2.0 3 SEQUOYAH-UNIT 2Pae2o17Risn1 Page 2 of 17 Revision 1 COLR FoR SEQUOYAH UNIT 2 CYCLE 20 2.0 OPERATING LIMITS The cycle-specific parameter limits for the TS listed in section 1 .0 are presented in the following subsections.
QA Record                                                                               QARcordL36 151009 803 SEQUOYAH UNIT 2 CYCLE 20 CORE OPERATING LIMITS REPORT REVISION I October 2015 Prepared by:
These limits have been developed using the NRC approved methodologies specified in TS 5.6.3. The versions of the topical reports which describe the methodologies used for this cycle are listed in Table 1.The following abbreviations are used in this section:, BOL stands for Beginning of Cycle Life EOL stands for End of Cycle Life RTP stands for RATED THERMAL POWER 2.1 SHUTDOWN MARGIN -SOM (TS 3.1.1, 3.1.4, 3.1.5, 3.1.6, 3.1.8)2.1.1 For TS 3.1.1, SOM shall be >_1.6 %Ak/k in MODE 2 with keff < 1.0, MODE 3 and MODE 4 2.1.2 For TS 3.1.1, SDM shall be >_1.0 %Ak/k in MODE 5.2.1.3 For TS 3.1.4, SDM shall be >1.6 %Ak/k in MODE 1 and MODE 2.2.1.4 For TS 3.1.5, SDM shall be >_1.6 %Ak/k in MODE 1 and MODE 2.2.1.5 For TS 3.1.6, SDM shall be >__1.6 %Ak/k in MODE 1 and MODE 2 with keff> 1.0.2.1.6 For TS 3.1.8, SDM shall, be >_.1.6 %Ak/k in MODE 2.SEQUOYAH-UNIT 2Pae3o17RvsnI Page 3 of 17.Revision 1
Christine A. Setter, PWR Fuel Engineering                                         Date Verified by:
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.2 Moderator Temperature Coefficient  
Jol*E.Strange., P,5R* Fuel Engineering                               /            DatO!e Reviewed by:
-MTC (TS 3.1.3)2.2.1 The BOL MTC limit is: less positive than 2.2.2 The EOL MTC limit is: less negative than or equal to 2.2.3 The 300 ppm Surveillance limit is: less negative than or equal to 2.2.4 The 60 ppm Surveillance limit is: less negative than or equal to-0.16 x10-5 Ak/k/&deg;F.-4.50 x 1 0 A Ak/k/&deg;F.-3.75 x 1 04 Ak/k/&deg;F.-4.20 x10A Ak/k/&deg;F.2.3 Shutdown Bank Insertion Limits (TS 3.1.5)2.3.1 Each shutdown bank shall be withdrawn to a position as defined below: SEQUOYAH-UNIT 2Pae4o17RvsnI
K   *he1A.Cnigam, PWR Fuel Engineering Manager                                   Date Brandon S. Catalanotto, Reactor Engineering Manager                               Date/
* Page 4 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.4 Control Bank Insertion Limits (TS 3.1.6)2.4.1 The control banks Shall be limited in physical insertion as shown in Figure 1.2.4.2 Each control bank shall be considered fully withdrawn from the core at>__225 steps.2.4.3 The control banks shall be operated in sequence by withdrawal of Bank A, Bank B, Bank C, and Bank 0. The control banks shall be sequenced in reverse order upon insertion.
                                                                                      /
2.4.4 Each control bank not fully withdrawn from the core shall be operated with the following overlap as a function of full out position.Full Out Position Bank Overlap Bank Difference (ts) (steps) (steps)225 9712 226 9812 227 99 128__________
Approved by:
228 100 128 229 101 128 230 102 128 231 103 "128 SEQUOYAH-UNIT 2Pae5o17RvsnI Page 5 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.5 Heat Flux Hot Channel Factor- FQ(X,Y,Z) (TS 3.2.1)RTP 2.5.1 FQ = 2.62 2.5.2 K(Z) is provided in Figure 2 2.5.3 NsLoPEAFD  
PORC Chairman                                                                     Date Plant Manager                                                               'Date Revision .. _1 Pages affected   All Reason for Revision: Update for Improved Technical Specifications (ITS) Implementation SEQUOYAH-UNJT 2Pae1o17Rvsn1                 Page 1 of 17                                   Revision 1
= 1.44 2.5.4 PSLOPEAFD  
 
= 1.76-2.5.5 NSLOPEf 2 (/I) = 1.48 2.5.6 PSLOPEf 2 (AI) = 2.98 M 2.5.7 The appropriate factor for increase in FQ (X,Y,Z) for compliance with SR 3.2.1.2 and SR 3.2.1.3 is specified as follows: For cycle burnups: 0 to 3312 MWd/mtU, use 2.0%For cycle burnups: > 3312 to 3864 MWd/mtU, use 2.12%For cycle* burnups: > 386,4 MWd/mtU, use 2.0%2.5.8 ITS LCO 3.2.1 Required Action A.3 reduces the Overpower Delta T Trip setpoints (value of K 4) at least 1% (in AT span) for each 1% that FQC(X,Y,Z) exceeds its limit.2.6 Nuclear Enthalpy Rise Hot Channel Factor -FAH(X,Y) (TS 3.2.2)2.6.1 MAP(X,Y,Z) is provided in Tables 2a and 2b.2.6.2 RRH = 3.34 when 0.8 < P_ 1.0 RRHIl.67 whenP<0.8 P = THERMAL POWER / RATED THERMAL POWER RRH = Thermal power reduction required to compensate for each*1% that FAH(X,Y) exceeds its limit.2.6.3 TRH = 0.0334 when 0.8 < P < 1.0 TRH = 0.01 67 when P < 0.8 P = THERMAL POWER I RATED THERMAL POWER TRH = Reduction in Overtemperature Delta T K 1 setpoint required to compensate for each 1 % that FAH(X,Y) exceeds its limit.SEQUOYAH-UNIT 2 Pg f1 Page 6 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.6.4 The appropriate factor for increase in FAHM (X,Y) for compliance with SR 3.2.2.1 and SR 3.2.2.2 is specified as follows: For all cycle burnups, use 2.0%: 2.6.5 ITS 3.2.2 Required Action A.4 reduces the overtemperature Delta T setpoint (K 1 term in Table 3.3.1-1) by > TRH multiplied by the FAN min margin.2.6.6 ITS 3.2.2 Required Action 8.1 reduces the Overtemperature Delta T setpoint (K 1 term in Table 3.3.1-1) by > TRH multiplied by the f 1 (Al)min margin.2.7 AXIAL FLUX DIFFERENCE  
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 1.0         CORE OPERATING LIMITS REPORT This CORE OPERATING LIMITS REPORT (COLR) for Sequoyah Unit 2 Cycle 20 has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.3.
-AFD (TS 3.2.3)2.7.1 The AFD limits are specified in Figure 3 SEQUOYAH-UNIT 2Pae7o17RvsnI Page 7 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.8 Reactor Trip System Instrumentation (TS 3.3.1)2.8.1 Trip Reset Term [f 1 (AI)] for Overtemperature Delta-T Trip The following parameters are required to specify the power level-dependent f 1 (AI) trip reset term limits for Table 3.3.1-1 (function 6), Overtemperature Delta-T trip function: 2.8.1 .1 QTNL = -20%where QTNL = the maximum negative Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
The TSs affected by this Report are listed below:
2.8.1.2 QTPL = +5%where QTPL = the maximum positive AlI setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
TS                                                                                   COLR     COLR Section         Technical Specification                   COLR Parameter             Section   Page 3.1.1     SHUTDOWN MARGIN (SDM)                 SDM                                   2.1     3 BOL MTC Limit                       2.2.1     4 313 Moderator Temperature                   EOL MTC Limit                       2.2.2     4 Coefficient (MTC)                     300Oppm Surveillance Limit           2.2.3     4 60 ppm Surveillance Limit             2.2.4     4 3.1.4     Rod Group Alignment Limits           SDM                                   2.1.3     3 Shutdown Bank Insertion Limits         2.3     4 3.1.5     Shutdown Bank Insertion LimitsSD214                                                   3 CotoS anDnetinLmt                     2..4     5 3.1.6rCntrolnBnkIInsetionnLiitsiSs                                         2.14     3 3.1.8     PHYSICS TESTS Exceptions           - SDM                                   2.1.6     3 MODE 2 FTP                                 2.5.1     6 K(Z)                                 2.5.2     6 NSLOPEAFD                             2.5.3     6 321 Heat Flux Hot ChanneiFactor             PSLOPEAFD                           2.5.4     6 (F0 (X,Y,Z))                         NSLOPEf 2 (AI)                       2.5.5     6 PSLOPEf 2 (AI)                       2.5.6     6 FQ(X,Y,Z) Appropriate Factor         2.5.7     6
2.8.1.3 QTNS = 2.50%where QTNS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QTNL).2.8.1.4 QTPS = 1.40%where QTPS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its positive limit at RATED THERMAL POWER (QTPL).SEQUOYAH-UNIT 2Pae8o17Rvsn1 Page 8 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.8.2 Trip Reset Term [fz(AI)] for Overpower Delta-T Trip The following parameters are required to specify the power level-dependent f 2 (AI)trip reset term limits for Table 3.3.1-1 (function 7), Overpower Delta-T trip function:.2.8.2.1 QPNL =-25%Where QPNL = the maximum negative Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
___________________ITS            LCO 3.2.1 Required Action A.3   2.5.8     6 MAP(X,Y,Z)                           2.6.1     6 RRH                                   2.6.2     6 322 Nuclear Enthalpy Rise Hot             TRH                                   2.6.3     6 Channel Factor (FAH(X,Y))             FAH(X,Y) Appropriate Factor           2.6.4     7 ITS 3.2.2 Required Action A.4         2.6.5     7 ITS 3.2.2 Required Action B.1         2.6.6     7 323 AXIAL FLUX DIFFERENCE                 AOLmt                                   .
2.8.2.2 QPPL = +25%where QPPL = the maximum positive Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
(AFD)                                 _   _ _ _   _   _ _ _ _   _ _
2.8.2.3 QPNS = 1.70%where QPNS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QPNL).2.8.2.4 QPPS = 1.70%where QPPS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al exceeds its positive limit at RATED THERMAL POWER (QPPL).2.9 Boron Concentration (TS 3.9.1)2.9.1 The refueling boron concentration shall be > 2000 ppm.SEQUOYAH-UNIT 2Pae9o17Rvsn1 Page 9 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 Table 1 COLR Methodology Topical Reports 1. BAW-1 0180-A, Revision 1, "NEMO-Nodal Expansion Method Optimized," March 1993.(Methodology for TS 3.1.1-SHUTDOWN MARGIN, 3.1.3-Moderator Temperature Coefficient, 3.9.1-Boron Concentration)-
331 Reactor Trip System (RTS)             QTNL, QTPL, QTNS, and QTPS           2.8.1     8 Instrumentation                       QPNL, QPPL, QPNS, and QPPS           2.8.2     9 3.9.1     Boron Concentration                   Refueling Boron Concentration         2.9     9 5.6.3     CORE REOT(OR OPERATING LlMITS              Aayia nltclMtos2.0 ehd                              3 SEQUOYAH-UNIT 2Pae2o17Risn1 Page 2 of 17                                             Revision 1
: 2. BAW-10169P-A, Revision 0, "RSG Plant Safety Analysis-B&W Safety Analysis Methodology for Recirculating Steam Generator Plants," October 1989.(Methodology for TS 3.1 .3-Moderator Temperature Coefficient)
 
: 3. BAW-1 01 63P-A, Revision 0, "Core Operating Limit Methodology for Westinghouse-Designed PWRs," June 1989.(Methodology for TS 3.3.1-Reactor Trip System Instrumentation  
COLR FoR SEQUOYAH UNIT 2 CYCLE 20 2.0     OPERATING LIMITS The cycle-specific parameter limits for the TS listed in section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in TS 5.6.3. The versions of the topical reports which describe the methodologies used for this cycle are listed in Table 1.
[f 1 (AI), f 2 (AI) limits], 3.1.5-Shutdown Bank Insertion Limits, 3.1.6-Control Bank Insertion Limits, 3.2.1-Heat Flux Hot Channel Factor, 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.2.3-AXIAL FLUX DIFFERENCE)
The following abbreviations are used in this section:,
: 4. EMF-2328(P)(A), "PWR Small Break LOCA Evaluation Model," March 2001.(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)5. BAW-1 0227P-A, Revision 1, "Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel,"' June 2003.(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)6. BAW-10186P-A, Revision 2, "Extended Burnup Evaluation," June 2003.(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)7. EMF-2103P-A, Revision 0, "Realistic Large Break LOCA Methodology for Pressurized Water Reactors," April 2003.(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)8. BAW-1 0241 P-A, Revision 1, "BHTP DNB Correlation Applied with LYNXT," July 2005.(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation  
BOL stands for Beginning of Cycle Life EOL stands for End of Cycle Life RTP stands for RATED THERMAL POWER 2.1     SHUTDOWN MARGIN         - SOM (TS 3.1.1, 3.1.4, 3.1.5, 3.1.6, 3.1.8) 2.1.1   For TS 3.1.1, SOM shall be >_1.6 %Ak/k in MODE 2 with keff < 1.0, MODE 3 and MODE 4 2.1.2   For TS 3.1.1, SDM shall be >_1.0 %Ak/k in MODE 5.
[f 1 (AI) limits])9. BAW-10199P-A, Revision 0, "The BWU Critical Heat Flux Correlations," August 1996.(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation  
2.1.3   For TS 3.1.4, SDM shall be >1.6 %Ak/k in MODE 1 and MODE 2.
[f 1 (AI) limits])10. BAW-10189P-A, "CHF Testing and Analysis of the Mark-BW Fuel Assembly Design," January 1996.(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation  
2.1.4   For TS 3.1.5, SDM shall be >_1.6 %Ak/k in MODE 1 and MODE 2.
[f 1 (Al) limits])11. BAW-1 01 59P-A, "BWCMV Correlation of Critical Heat Flux in Mixing Vane Grid Fuel Assemblies," August 1990.(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation  
2.1.5   For TS 3.1.6, SDM shall be >__1.6 %Ak/k in MODE 1 and MODE 2 with keff> 1.0.
[f 1 (AI) limits])12. BAW-10231 P-A, Revision .1, "COPERNIC Fuel Rod Design Computer Code," January 2004.(Methodology for TS 3.3.1-Reactor Trip System Instrumentation  
2.1.6   For TS 3.1.8, SDM shall, be >_.1.6 %Ak/k in MODE 2.
[f 2 (Al) limits])SEQUOYAH-UNIT 2 Pg 0o 7Rvso Page 10 of 17 Revision 1 CQLR FOR SEQUOYAH UNIT 2 CYCLE 20 Table 2a Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation Advanced W17 HTP T M Fuel (TS 3.2.2)AXIAL(X,Y)
SEQUOYAH-UNIT 2Pae3o17RvsnIPage 3 of 17                                 .Revision 1
ELEVATION (ft) MAP(X,Y,Z) 1 1.8128 2 1.8125 3 1.8122 4 1.8119 5 1.8115 1.1 6 1.8109 7 1.8106 8 1.8104 9 1.8098 10 1.8092______11 1.7599 1 2.0671 2 2.0664 3 2.0656 4 2.0649 5 2.0642 1.2 6 2.0636 7 2.0624 8 2.0615 9 2.0457 10 1.9492_____11 1.8589 1 2.3433 2 2.3419 3 2.3412 4 2.3397 5 2.3389 1.3 6 2.3381-7 2.3357 8 2.3130 9 2.1886 10 2.0643______11 1.9439 AXIAL(X,Y)
 
ELEVATION (ft) MAP(X,Y,Z) 1 2.5969 2 2.5380 3 2.4827 4 2.4411 5 2.4315 1.4 6 2.4800 7 2.5356 8 2.4447 9 2.3555 10 2.1738 11 2.0238 1 2.6723 2 2.6061 3 2.5417 4 2.4913 5 2.4801 1.5 6 2.5380 7 2.6273 8 2.5311 9 2.4447 10 2.2772 11 2.0975 1 2.7308 2 2.6605 3. 2.5947 4 2.5371 5 2.5234 1.6 6 2.5906 7 2.7077 8 2.6117 9 2.5240 10 2.3758_ _ _ _ _11 2.1662 SEQUOYAH-UNIT 2Pae1of7eisnI Page 11 of 17 Revision 1 CO ablFO 2OaH UcnIti2n YCed 20 Table 2a (continued)
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.2   Moderator Temperature Coefficient - MTC (TS 3.1.3) 2.2.1   The BOL MTC limit is:
AXIAL(X,Y)
less positive than               -0.16 x10-5 Ak/k/&deg;F.
ELEVATION (ft) MAP(X,Y,Z) 1 ,2.7664 2 2.7083 3 2.6380 4 2.5791 5 2.5639 1.7 6 2.6359, 7 2.7795 8 2.6870 9 2.5798 10 2.4726 11 2.2304 1 2.7963 2 2.7466 3 2.6775 4 2.6172 5 2.6010 1.8 6 2.6802 7 2.8456 8 2.7552 9 2.6648 10 2.5655 11 2.2931 1 2.8235 2 2.7739 3 2.7125 4 2.6523 5 2.6328 1.9 6 2.7200 7 2.9065 8 2.8193 9 2.7288 10 2.6384_____11 2.3482 AXlAL(X,Y)
2.2.2   The EOL MTC limit is:
ELEVATION (ft) MAP(X,Y,Z) 1 2.4339 2 2.4060 3 2.3856 4 2.3423 5 2.3114>1.9 6 2.6006 7 2.5003 8 2.4004 9 2.2989 10 2.1483_____11 1.9630 1 2.5057 2 2.4754 3 2.4449 4 2.3591 5 2.4205 2.1 6 2.7643 7 2.6474 8 2.5360 9 2.4400 10 2.3277_____11 2.0549 1 2.5380 2 2.5216 3 2.4619 4 2.4294 5 2.4290 2.3 6 2.8222 7 2.7334 8 2.6234 9 2.5186 10 2.4215_____11 2.1250 SEQUOYAH-UNIT 2Pae1of7 Page 12 of 17 Revision 1 TableFO 2OaH UcnIti2nCYLEd 2 Table 2a (continued)
less negative than or equal to     -4.50 x 10 A Ak/k/&deg;F.
AXIAL(X,Y)
2.2.3   The 300 ppm Surveillance limit is:
ELEVATION (ft) MAP(X,Y,Z) 1 2.6440 2 2.5160' 3 2.5045 4 2.4488 5 2.5803 2.5. 6 2.9481 7 2.8544 8 2.7286 9 2.6450 10 2.5527_____11 2.1731 1 2.5554 2 2.5529 3 2.5197 4 2.4375 5 2.5643 2.7 6 2.9839 7 2.8837 8 2.7939 9 2.7040 10 .2.5997 11 2.1995 1 2.4223 2 2.5653 3 2.5075 4 2.3955 5 2.7295 2.9 6 3.0921 7 3.0070 8 2.8896 9 2.8058 10 2.6974_____11 2.2039 AXIAL(X,Y)
less negative than or equal to     -3.75 x 104 Ak/k/&deg;F.
ELEVATION (ft) MAP(X,Y,Z) 1 2.2448 2 2.5535 3 2.4678 4 2.3229 5 2.8913 3.1 6 3.1515 7 3.0181 8 2.9699 9 2.8941 10 2.7819 11 2.1866 1 2.0228 2 2.5172 3 2.4007 4 2.2195 5 3.0496 3.3 6 3.2226 7 3.1446 8 3.0350 9 2.9688 10 2.8533 11 2.1473 1. 1.7563 2 2.4566 3 2.3062 4 2.0854 5 3.2045 3.5 6 3.2929 7 3.2627 8 3.0846 9 .3.0299 10. 2.9117_____11 2.0862 SEQUOYAH-UNIT 2 Pg 3f7Rvso Page 13 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 Table 2b Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation Mark-BW Fuel (TS 3.2.2)AXIAL(X,Y)
2.2.4   The 60 ppm Surveillance limit is:
ELEVATION (ft) MAP(X,Y,Z) 2 1.9343 4 1.9300 1.1 6 1.9234 8 1.9115 10 1.8894 2 2.1663 4 2.1558 1.2 6 2.1410 8 2.1153'10 2,0582 2 *2.4023 4 2.3825 1.3 6 2.3599 8 2.3100_______10 2.1760 2 2.6453 4 2.6136 1.4 6 2.5610 8 2.4199 10 2.2787 2 2.7189 4 2.8181 1.5 6 2.6735 8 2.5280 10 2.3749 2 2.7720 4 2.9219 1.7 6 2.8641 8 2.7064 10 2.5539 AXIAL(X,Y)
less negative than or equal to     -4.20 x10A Ak/k/&deg;F.
ELEVATION (ft) MAP(X,Y,Z) 2 2.8143 4 2.9856 1.9 6 3.0073 8 2.8509 10 2.7048 2 2.4405 4 2.4405>1.9 6 2.7376 8 2.5906 10 2.3456 2 2.5881 4 2.5881 2.2 6 2.9899 8 2.7800 10 2.5367 2 2.6111 4 2.6111 2.6 6 3.2947 8 3.2055 10 2.8049 2 2.9142 4 2.9142 36 4.0216 8 3.6527 10 3.1711 2 2.9618 4 2.9618 3.5 6 4.2351 8 3.7452 10 3.3214 SEQUOYAH-UNIT 2 Pg 4o 7Rvso Page 14 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 r- /~- BA K C/* 140& (u120 8 w100 _______BANK 0D Z80 40 /20, 0 {.09,o) ________ ________ _______ _______0 0.2 0.A 0.6 0_8 (Fully Inserted)Fraction of RATED THERMAL POWER FIGURE 1 Rod Bank Insertion Limits Versus THERMAL POWER, Four Loop Operation (TS 3.1.6)* Fully withdrawn region shall be the condition where shutdown and control banks are at a position within the interval of >225 and <231 steps withdrawn, inclusive.
2.3  Shutdown Bank Insertion Limits (TS 3.1.5) 2.3.1   Each shutdown bank shall be withdrawn to a position as defined below:
Fully withdrawn shall be the position as defined below, Cycle Burnup (MWd/mtU)
SEQUOYAH-UNIT 2Pae4o17RvsnI*Page 4 of 17                           Revision 1
Steps Withdrawn0  225 to -231 This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.
 
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.4   Control Bank Insertion Limits (TS 3.1.6) 2.4.1     The control banks Shall be limited in physical insertion as shown in Figure 1.
2.4.2     Each control bank shall be considered fully withdrawn from the core at>__225 steps.
2.4.3     The control banks shall be operated in sequence by withdrawal of Bank A, Bank B, Bank C, and Bank 0. The control banks shall be sequenced in reverse order upon insertion.
2.4.4     Each control bank not fully withdrawn from the core shall be operated with the following overlap as a function of full out position.
Full Out Position             Bank Overlap                 Bank Difference (ts)           (steps)                   (steps) 225                         9712 226                         9812 227                         99                           128__________
228                         100                           128 229                         101                           128 230                         102                           128 231                         103                           "128 SEQUOYAH-UNIT 2Pae5o17RvsnIPage 5 of 17                                 Revision 1
 
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.5   Heat Flux Hot Channel Factor- FQ(X,Y,Z) (TS 3.2.1)
RTP 2.5.1   FQ     =       2.62 2.5.2   K(Z) is provided in Figure 2 2.5.3   NsLoPEAFD =     1.44 2.5.4   PSLOPEAFD =     1.76-2.5.5   NSLOPEf 2(/I) = 1.48 2.5.6   PSLOPEf 2(AI) = 2.98 M
2.5.7   The appropriate factor for increase in FQ (X,Y,Z) for compliance with SR 3.2.1.2 and SR 3.2.1.3 is specified as follows:
For cycle burnups:           0 to 3312 MWd/mtU,   use 2.0%
For cycle burnups:     > 3312 to 3864 MWd/mtU,     use 2.12%
For cycle* burnups:               > 386,4 MWd/mtU,   use 2.0%
2.5.8     ITS LCO 3.2.1 Required Action A.3 reduces the Overpower Delta T Trip setpoints (value of K4 ) at least 1% (in AT span) for each 1% that FQC(X,Y,Z) exceeds its limit.
2.6   Nuclear Enthalpy Rise Hot Channel Factor - FAH(X,Y) (TS 3.2.2) 2.6.1     MAP(X,Y,Z) is provided in Tables 2a and 2b.
2.6.2     RRH   =   3.34   when 0.8   < P_* 1.0 RRHIl.67         whenP<0.8 P = THERMAL POWER / RATED THERMAL POWER RRH   =   Thermal power reduction required to compensate for each
                          *1% that FAH(X,Y) exceeds its limit.
2.6.3     TRH   = 0.0334 when 0.8   < P < 1.0 TRH   = 0.01 67 when P   < 0.8 P = THERMAL POWER I RATED THERMAL POWER TRH = Reduction in Overtemperature Delta T K1 setpoint required to compensate for each 1% that FAH(X,Y) exceeds its limit.
SEQUOYAH-UNIT 2                 Pg Page 6 off117                        Revision 1
 
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.6.4   The appropriate factor for increase in FAHM (X,Y) for compliance with SR 3.2.2.1 and SR 3.2.2.2 is specified as follows:
For all cycle burnups, use 2.0%:
2.6.5   ITS 3.2.2 Required Action A.4 reduces the overtemperature Delta T setpoint (K1 term in Table 3.3.1-1) by > TRH multiplied by the FAN min margin.
2.6.6   ITS 3.2.2 Required Action 8.1 reduces the Overtemperature Delta T setpoint (K1 term in Table 3.3.1-1) by > TRH multiplied by the f1 (Al) min margin.
2.7   AXIAL FLUX DIFFERENCE       - AFD (TS 3.2.3) 2.7.1   The AFD limits are specified in Figure 3 SEQUOYAH-UNIT 2Pae7o17RvsnI Page 7 of 17                           Revision 1
 
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.8   Reactor Trip System Instrumentation (TS 3.3.1) 2.8.1     Trip Reset Term [f1(AI)] for Overtemperature Delta-T Trip The following parameters are required to specify the power level-dependent f1(AI) trip reset term limits for Table 3.3.1-1 (function 6), Overtemperature Delta-T trip function:
2.8.1 .1   QTNL   = -20%
where QTNL     = the maximum negative Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
2.8.1.2   QTPL = +5%
where QTPL   = the maximum positive AlI setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
2.8.1.3   QTNS = 2.50%
where QTNS     = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QTNL).
2.8.1.4     QTPS   = 1.40%
where QTPS     = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its positive limit at RATED THERMAL POWER (QTPL).
SEQUOYAH-UNIT 2Pae8o17Rvsn1Page 8 of 17                                     Revision 1
 
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.8.2     Trip Reset Term [fz(AI)] for Overpower Delta-T Trip The following parameters are required to specify the power level-dependent f2 (AI) trip reset term limits for Table 3.3.1-1 (function 7), Overpower Delta-T trip function:
            .2.8.2.1   QPNL =-25%
Where QPNL     = the maximum negative Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
2.8.2.2   QPPL   = +25%
where QPPL     = the maximum positive Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
2.8.2.3   QPNS   = 1.70%
where QPNS     =   the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QPNL).
2.8.2.4   QPPS   = 1.70%
where QPPS     = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al exceeds its positive limit at RATED THERMAL POWER (QPPL).
2.9     Boron Concentration (TS 3.9.1) 2.9.1     The refueling boron concentration shall be > 2000 ppm.
SEQUOYAH-UNIT 2Pae9o17Rvsn1                                               Revision 1 Page 9 of 17
 
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 Table 1 COLR Methodology Topical Reports
: 1. BAW-1 0180-A, Revision 1, "NEMO-Nodal Expansion Method Optimized," March 1993.
(Methodology for TS 3.1.1-SHUTDOWN MARGIN, 3.1.3-Moderator Temperature Coefficient, 3.9.1-Boron Concentration)-
: 2. BAW-10169P-A, Revision 0, "RSG Plant Safety Analysis-B&W Safety Analysis Methodology for Recirculating Steam Generator Plants," October 1989.
(Methodology for TS 3.1 .3-Moderator Temperature Coefficient)
: 3. BAW-1 01 63P-A, Revision 0, "Core Operating Limit Methodology for Westinghouse-Designed PWRs," June 1989.
(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f1(AI), f2(AI) limits],
3.1.5-Shutdown Bank Insertion Limits, 3.1.6-Control Bank Insertion Limits, 3.2.1-Heat Flux Hot Channel Factor, 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.2.3-AXIAL FLUX DIFFERENCE)
: 4. EMF-2328(P)(A), "PWR Small Break LOCA Evaluation Model," March 2001.
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
: 5. BAW-1 0227P-A, Revision 1, "Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel,"' June 2003.
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
: 6. BAW-10186P-A, Revision 2, "Extended Burnup Evaluation," June 2003.
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
: 7. EMF-2103P-A, Revision 0, "Realistic Large Break LOCA Methodology for Pressurized Water Reactors," April 2003.
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
: 8. BAW-1 0241 P-A, Revision 1, "BHTP DNB Correlation Applied with LYNXT," July 2005.
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])
: 9. BAW-10199P-A, Revision 0, "The BWU Critical Heat Flux Correlations," August 1996.
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])
: 10. BAW-10189P-A, "CHF Testing and Analysis of the Mark-BW Fuel Assembly Design,"
January 1996.
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(Al) limits])
: 11. BAW-1 01 59P-A, "BWCMV Correlation of Critical Heat Flux in Mixing Vane Grid Fuel Assemblies," August 1990.
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])
: 12. BAW-10231 P-A, Revision .1, "COPERNIC Fuel Rod Design Computer Code," January 2004.
(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f2(Al) limits])
SEQUOYAH-UNIT 2                   Pg Page 100oof 17 7Rvso                  Revision 1
 
CQLR FOR SEQUOYAH UNIT 2 CYCLE 20 Table 2a Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation Advanced W17 HTP TM Fuel (TS 3.2.2)
AXIAL(X,Y)     ELEVATION (ft) MAP(X,Y,Z)      AXIAL(X,Y)    ELEVATION (ft) MAP(X,Y,Z) 1         1.8128                             1          2.5969 2         1.8125                             2          2.5380 3         1.8122                             3          2.4827 4         1.8119                             4          2.4411 5         1.8115                             5          2.4315 1.1             6         1.8109           1.4              6          2.4800 7         1.8106                             7          2.5356 8         1.8104                             8          2.4447 9         1.8098                             9          2.3555 10         1.8092                            10          2.1738
______11                  1.7599                           11          2.0238 1         2.0671                             1          2.6723 2         2.0664                             2          2.6061 3         2.0656                             3          2.5417 4          2.0649                           4          2.4913 5         2.0642                             5          2.4801 1.2             6         2.0636           1.5              6          2.5380 7         2.0624                             7          2.6273 8         2.0615                             8          2.5311 9         2.0457                             9          2.4447 10         1.9492                            10          2.2772
_____11                    1.8589                           11          2.0975 1         2.3433                             1          2.7308 2          2.3419                           2          2.6605 3          2.3412                           3.          2.5947 4         2.3397                           4          2.5371 5         2.3389                           5          2.5234 1.3               6         2.3381           1.6            6          2.5906
                    -7         2.3357                           7          2.7077 8         2.3130                             8          2.6117 9         2.1886                             9          2.5240 10         2.0643                            10          2.3758
______11                    1.9439           __  __ _11                  2.1662 SEQUOYAH-UNIT 2Pae1of7eisnI Page 11 of 17                            Revision 1
 
YCed 20 CO    ablFO2OaH UcnIti2n Table 2a (continued)
AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z)       AXlAL(X,Y)      ELEVATION (ft) MAP(X,Y,Z) 1          ,2.7664                              1          2.4339 2            2.7083                              2          2.4060 3            2.6380                              3          2.3856 4            2.5791                              4          2.3423 5            2.5639                              5          2.3114 1.7            6            2.6359,          >1.9              6          2.6006 7            2.7795                              7          2.5003 8            2.6870                              8         2.4004 9           2.5798                              9          2.2989 10            2.4726                              10         2.1483 11           2.2304            _____11                      1.9630 1            2.7963                              1         2.5057 2            2.7466                              2          2.4754 3            2.6775                              3         2.4449 4            2.6172                              4         2.3591 5            2.6010                              5         2.4205 1.8            6           2.6802            2.1                6         2.7643 7            2.8456                              7         2.6474 8            2.7552                              8         2.5360 9            2.6648                              9         2.4400 10           2.5655                              10          2.3277 11           2.2931            _____11                      2.0549 1           2.8235                              1         2.5380 2            2.7739                              2           2.5216 3           2.7125                              3          2.4619 4            2.6523                              4           2.4294 5            2.6328                              5           2.4290 1.9            6           2.7200            2.3                6          2.8222 7            2.9065                              7          2.7334 8            2.8193                              8          2.6234 9            2.7288                              9           2.5186 10           2.6384                              10          2.4215
_____11                    2.3482            _____11                      2.1250 SEQUOYAH-UNIT 2Pae1of7                                                Revision 1 Page 12 of 17
 
2 2OaH UcnIti2nCYLEd TableFO Table 2a (continued)
AXIAL(X,Y)  ELEVATION (ft) MAP(X,Y,Z)        AXIAL(X,Y)   ELEVATION (ft) MAP(X,Y,Z) 1         2.6440                            1          2.2448 2         2.5160                            2           2.5535
              '  3          2.5045                            3          2.4678 4          2.4488                            4          2.3229 5          2.5803                            5          2.8913 2.5.           6          2.9481              3.1            6          3.1515 7          2.8544                            7          3.0181 8          2.7286                            8          2.9699 9          2.6450                            9          2.8941 10          2.5527                            10          2.7819
_____11                  2.1731                            11          2.1866 1         2.5554                            1          2.0228 2          2.5529                            2           2.5172 3          2.5197                            3           2.4007 4          2.4375                            4          2.2195 5          2.5643                            5          3.0496 2.7            6          2.9839              3.3            6          3.2226 7          2.8837                            7          3.1446 8          2.7939                            8          3.0350 9          2.7040                            9          2.9688 10        .2.5997                            10          2.8533 11          2.1995                            11          2.1473 1          2.4223                            1.         1.7563 2          2.5653                            2           2.4566 3         2.5075                            3          2.3062 4          2.3955                            4          2.0854 5          2.7295                            5          3.2045 2.9           6          3.0921              3.5            6          3.2929 7          3.0070                            7          3.2627 8          2.8896                            8          3.0846 9          2.8058                            9         .3.0299 10          2.6974                            10.          2.9117
_____11                  2.2039              _____11                  2.0862 SEQUOYAH-UNIT 2                Pg Page 133f7Rvso of 17                      Revision 1
 
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 Table 2b Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation Mark-BW Fuel (TS 3.2.2)
AXIAL(X,Y)      ELEVATION (ft) MAP(X,Y,Z)      AXIAL(X,Y) ELEVATION (ft)  MAP(X,Y,Z) 2        1.9343                          2            2.8143 4         1.9300                          4            2.9856 1.1                6        1.9234            1.9          6           3.0073 8        1.9115                          8           2.8509 10        1.8894                        10           2.7048 2         2.1663                          2           2.4405 4        2.1558                          4           2.4405 1.2                6        2.1410            >1.9          6           2.7376 8        2.1153                          8           2.5906
                      '10        2,0582                        10           2.3456 2        *2.4023                          2           2.5881 4        2.3825                          4           2.5881 1.3               6        2.3599            2.2          6           2.9899 8         2.3100                          8            2.7800
_______10                    2.1760                        10            2.5367 2         2.6453                          2            2.6111 4        2.6136                          4           2.6111 1.4                6         2.5610            2.6          6            3.2947 8        2.4199                          8            3.2055 10        2.2787                        10            2.8049 2         2.7189                          2            2.9142 4        2.8181                          4           2.9142 1.5                6         2.6735                36                    4.0216 8         2.5280                          8            3.6527 10        2.3749                        10            3.1711 2         2.7720                          2           2.9618 4        2.9219                          4           2.9618 1.7                6         2.8641            3.5          6            4.2351 8        2.7064                          8           3.7452 10         2.5539                         10            3.3214 SEQUOYAH-UNIT 2                  Pg 144oof 17 Page        7Rvso                Revision 1
 
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 r-                  /~-          BA K C/
* 140
        &          (u1208 w100                                                                              _______
        -*                                                                        BANK 0D Z80 40                              /
20, 0 {.09,o)            ________          ________            _______          _______
0                0.2               0.A              0.6             0_8 (Fully Inserted)
Fraction of RATED THERMAL POWER FIGURE 1 Rod Bank Insertion Limits Versus THERMAL POWER, Four Loop Operation (TS 3.1.6)
* Fully withdrawn region shall be the condition where shutdown and control banks are at a position within the interval of >225 and <231 steps withdrawn, inclusive.
Fully withdrawn shall be the position as defined below, Cycle Burnup (MWd/mtU)                               Steps Withdrawn
                    &#x17d;0                                            &#x17d; 225 to -231 This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.
If the LEEM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the rod insertion limit lines must be increased by 3 steps withdrawn until the LEFM is returned to operation.
If the LEEM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the rod insertion limit lines must be increased by 3 steps withdrawn until the LEFM is returned to operation.
SEQUOYAH-UNIT 2 Pg 5o 7Rvso Page 15 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 1.2 1.0 0.8 0.6 0.4 0.2 0.0 I 2 2 I I 2 I I-2 I I I I I I 2 I 4-----2 2 2 2 I 2 2 I 2 2 Elevation K(z)(ft)0.000 1.0000 6.285 1.0000 -~----------
SEQUOYAH-UNIT 2                             Pg Page 155oof 17 7Rvso                      Revision 1
2 7.995 1.0000 2 2 2 2 9.705 1.0000 2 2 2 12.000 1.0000 2 2-2 2 I 2 2 2 2 2 2 2 2 I. 2 2 2 2 I I 2 I I I I 0 2 4 6 Core Height (Feet)10 12 FIGURE 2 K(Z) -Normalized FQ(X,Y,Z) as a Function of Core Height (TS 3.2.1 )SEQUOYAH-UNIT 2 Pg 6o 7Rvso Page 16 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 I-1-S1*6='U 120 110 100 90 80 70 60 50 40 30 20 10 0 I I II---K- ---L U accept be_/--tperatD-7 -n---I----/ .--&deg;PecirainI
 
* -- I--/ t- --- I (-4b,5o) I I I II I I-- -V- -- -K-I [-.II i I _-- -- i28,o -I 2-----1--K* l--I-I I.v-50 30 10 0 10 Flux Difference (hl) %20 30 40 50 FIGURE 3 AXIAL FLUX DIFFERENCE Limits As A Function of RATED THERMAL. POWER.For Burnup Range 0 EFPD to EOL (TS 3.2.3)This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in oPeration.
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 1.2 I             2           2   I I             2           I   I
If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable  
                            -       2 1.0                                          I           I   I I             I           I 2         I 0.8          4-----2 2             2         2 I               2         2   I 2         2 0.6 Elevation     K(z)
*power level must be reduced by 1.3% in power, and the AFD limit lines must be made more restrictive by 1% in AFO until the LEFM is returned to operation.
(ft) 0.000       1.0000 0.4 6.285       1.0000   -~----------
SEQUOYAH-UNIT 2 Pg 7o 7Rvso Page 17 of 17 Revision 1 Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee 37384-2000 November 16, 2015 10 CFR 50.4 ATTN: Document Controi Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328  
2       7.995       1.0000     2         2   2 2       9.705       1.0000     2         2   2 12.000       1.0000               2    2 0.2             -             2             2         I 2             2         2   2 2             2         2   2 I.             2         2   2 2               I             I         2   I I         I   I 0.0 0        2                 4             6             10          12 Core Height (Feet)
FIGURE 2 K(Z) - Normalized FQ(X,Y,Z) as a Function of Core Height (TS 3.2.1 )
SEQUOYAH-UNIT 2                       Page 166oof 17 Pg             7Rvso         Revision 1
 
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 120 110 100
                          --- K-I I       II
                                                - - - L I --
II
                                                                            -V---
I I
K-I
[-.
Uaccept be_/
90          - -tperatD-     7     -n-I-
80      -  -I----/.         --   &deg;PecirainI           II          i  I _
70
                                                                      --      --    i28,o      -
60      * -- I--/t- ---               I 1-S1 50
              *6=
                'U
(-4b,5o) I         I 40 30              I2 20
                                                        ---             1--K 10
* l--
I           -I 0v                                          I.
                        -50       -40    -30   -20    -10     0     10       20    30  40    50 Flux Difference (hl) %
FIGURE 3 AXIAL FLUX DIFFERENCE Limits As A Function of RATED THERMAL. POWER
                                          .For Burnup Range 0 EFPD to EOL (TS 3.2.3)
This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in oPeration.
If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable *power level must be reduced by 1.3% in power, and the AFD limit lines must be made more restrictive by 1% in AFO until the LEFM is returned to operation.
SEQUOYAH-UNIT 2                               Pg Page 17 7oof 17 7Rvso                    Revision 1
 
Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee 37384-2000 November 16, 2015 10 CFR 50.4 ATTN: Document Controi Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328


==Subject:==
==Subject:==
Sequoyah Unit I Cycle 21, and Unit 2 Cycle 20 Core Operating Limits Reports, Revision No. 1


==References:==
==References:==
: 1. Letter from NRC to TVA, "Sequoyah Nuclear Plant, Units 1 and 2
                          -  Issuance of Amendments for the Conversion to the Improved Technical Specifications with Beyond Scope Issues (TAC Nos.
MF3128 and MF3129)," dated September 30, 20015 (ML15238B460)
In accordance with Sequoyah Nuclear Plant (SQN) Units 1 and 2 Technical Specifications (TSs) 5.6.3.d, enclosed is the Unit 1 Cycle 21 Core Operating Limits Report (COLR), Revision 1, and Unit 2 Cycle 20OCOLR, Revision 1. In accordance with TSs 5.6.3.d, the COLRs are required to be provided to the Nuclear Regulatory Commission (NRC) within 30 days of issuance for each reload cycle. Sequoyah Units 1 and 2 were issued license amendment Nos. 334 and 327, respectively for improved standard TSs (Reference 1). These license amendments resulted in the revisions to each of the COLRs as discussed in Enclosure 1. The revised COLRs became effective on October 21, 2016.
There are no new regulatory commitments in this letter. If you have any questions, please contact Jonathan Johnson, SQN Site Licensing Manager at (423) 843-8129.
Soso


Sequoyah Unit I Cycle 21, and Unit 2 Cycle 20 Core Operating Limits Reports, Revision No. 1 1. Letter from NRC to TVA, "Sequoyah Nuclear Plant, Units 1 and 2-Issuance of Amendments for the Conversion to the Improved Technical Specifications with Beyond Scope Issues (TAC Nos.MF3128 and MF3129)," dated September 30, 20015 (ML1 5238B460)In accordance with Sequoyah Nuclear Plant (SQN) Units 1 and 2 Technical Specifications (TSs) 5.6.3.d, enclosed is the Unit 1 Cycle 21 Core Operating Limits Report (COLR), Revision 1, and Unit 2 Cycle 20OCOLR, Revision 1. In accordance with TSs 5.6.3.d, the COLRs are required to be provided to the Nuclear Regulatory Commission (NRC) within 30 days of issuance for each reload cycle. Sequoyah Units 1 and 2 were issued license amendment Nos. 334 and 327, respectively for improved standard TSs (Reference 1). These license amendments resulted in the revisions to each of the COLRs as discussed in Enclosure
U.S. Nuclear Regulatory Commission Page 2 November 16, 2015 Sequoyah Nuclear Plant Enclosures
: 1. The revised COLRs became effective on October 21, 2016.There are no new regulatory commitments in this letter. If you have any questions, please contact Jonathan Johnson, SQN Site Licensing Manager at (423) 843-8129.Soso U.S. Nuclear Regulatory Commission Page 2 November 16, 2015 Sequoyah Nuclear Plant Enclosures 1.2.3.Units 1 and 2 Core Operating Limits Report Changes Sequoyah Unit I Cycle 21 Core Operating Limits Report, Revision 1 Sequoyah Unit 2 Cycle 20 Core Operating Limits Report, Revision 1 ZTK: DVG Enclosures cc (Enclosures):
: 1.      Units 1 and 2 Core Operating Limits Report Changes
NRC Regional Administrator
: 2.      Sequoyah Unit I Cycle 21 Core Operating Limits Report, Revision 1
-Region II NRC Senior Resident Inspector
: 3.      Sequoyah Unit 2 Cycle 20 Core Operating Limits Report, Revision 1 ZTK: DVG Enclosures cc (Enclosures):
-SQN ENCLOSURE1I SEQUOYAH UNITS 1 AND 2 CORE OPERATING LIMITS REPORT CHANGES The following describes the changes made to each Units' Core Operating Limits Report (COLR), as result of the NRC review and approval of License Amendment Request for the conversion of the Sequoyah Technical Specification (TS) to Improved Standard Technical Specification, NUREG-1 431, Revision 4.1. Acronyms for All Rods Out (ARO) and Hot Zero THERMAL POWER (HZP) were removed from the COLRs.2. In Section 1.0, a table was added to assist user of the COLRs.3. Section 2.0 was updated to align the new TSs Reporting Requirements Section, 5.6.3,"Core Operating Limits Report".4. In Section 2.1 the Cycle-Specific Parameter Limits were relocated from the TSs to the COLRs. These parameters involve the Shutdown Margin requirements with references to the associated Limiting Condition for Operation (LCO).5. 60 ppm Moderator Temperature Coefficient limits were added in "Section 2.2 consistent with the NOTE in TSs LCO 3.1.3, "Moderator Temperature Coefficient," Surveillance Requirement 3.1.3.2.6. Control Bank Insertion Limits requirement were added in Section 2.4 as necessary for TSs LCO 3.1.6, "Control Bank Insertion Limits," Surveillance Requirements.
NRC Regional Administrator - Region II NRC Senior Resident Inspector - SQN
: 7. Section 2.5 was revised to add information relocated from previous TSs for consistency with approved TSs LCO 3.2.1, "Heat Flux Hot Channel Factor (Fq(X, Y, Z))".8. Section 2.6 was revised to add information relocated from previous TSs for consistency with approved TSs LCO 3.2.2, 'Nuclear Enthalpy Rise Hot Channel Factor F&H(X, Y)".9. Power Distribution Limits coefficient definitions, such as BQNOM and BHDES, were eliminated as these are defined in the TS Bases.10. The boron concentration limit for TSs LCO 3.9.1, 'Boron Concentration," were added to the COLRs consistent with the approved TVA License Amendment Request.
 
ENCLOSURE 2 SEQUOYAH UNIT 1 CYCLE 21 CORE OPERATING LIMITS REPORT REVISION 1 QA Record QA RcordL36 151009 802 SEQUOYAH UNIT 1 CYCLE 21 CORE OPERATING LIMITS REPORT REVISION 1 October 2015 Prepared by: Christine A. Setter, PWR Fuel Engineering Verified by: John E. Strange, P R Fuel Engineering Reviewed by:
ENCLOSURE1I SEQUOYAH UNITS 1 AND 2 CORE OPERATING LIMITS REPORT CHANGES The following describes the changes made to each Units' Core Operating Limits Report (COLR), as result of the NRC review and approval of License Amendment Request for the conversion of the Sequoyah Technical Specification (TS) to Improved Standard Technical Specification, NUREG-1 431, Revision 4.
unningham, PW Fue ngneig ManagerL radnS. Catalanotto, Reactor Engineering Manager Approved by: Date Date Date/ '&,/S Date Revision Pages affected All Reason for Revision:  
: 1. Acronyms for All Rods Out (ARO) and Hot Zero THERMAL POWER (HZP) were removed from the COLRs.
*Update for Improved Technical Specifications  
: 2. In Section 1.0, a table was added to assist user of the COLRs.
('ITS) Implementation SEQUOYAH-UNIT 1Pae1o16Rvsn1 Page 1 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 1.0 CORE OPERATING LIMITS REPORT This CORE OPERATING LIMITS REPORT (COLR) for Sequoyah Unit I Cycle 21 has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.3.The TSs affected by this Report are listed below: TS COLR COLR Section Technical Specification COLR Parameter Section Page 3.1.1 SHUTDOWN MARGIN (SDM) SDM 2.1 3 BOL MTC Limit 2.2.1 4 3.3 Moderator Temperature EOL MTC Limit "2.2.2 4 313 Coefficient (MTC) 300 ppm Surveillance Limit 2.2.3 4________________60 ppm Surveillance Limit 2.2.4 4 3.1.4 Rod Group Alignment Limits SDM 2.1.3 3 Shutdown Bank Insertion Limits 2.3 4 3.1.5 Shutdown Bank Insertion LimitsSD2.4 3 CotoS BnDnsrinMiit 2.14 5 3.1.6rConrolnBanknnsertion imitstSD 2.1. 3 3.1.8 PHYSICS TESTS Exceptions-SDM 2.1.6 3 MODE 2 -___________
: 3. Section 2.0 was updated to align the new TSs Reporting Requirements Section, 5.6.3, "Core Operating Limits Report".
__FQ 2.5.1 6 K(Z) 2.5.2 6 NSLOPEAFD 2.5.3 6 321 H eat Flux Hot Channel Factor PSLOPEAFD 2.5.4 6 321 (F 0 (X,Y,Z)) NSLOPEf 2 (Al) 2.5.5 6 PSLOPEf 2 (AI) 2.5.6 6 FQ(X,YZ) Appropriate Factor 2.5.7 6 ITS LCO 3.2.1 Required Action A.3 2.5.8 6 MAP(X,Y,Z) 2.6.1 6 RRH 2.6.2 6 Nuclear Enthalpy Rise Hot TRH2.3 6 3.2.2263 6 Channel Factor (FAH(XY))
: 4. In Section 2.1 the Cycle-Specific Parameter Limits were relocated from the TSs to the COLRs. These parameters involve the Shutdown Margin requirements with references to the associated Limiting Condition for Operation (LCO).
FAH(X,Y) Appropriate Factor 2.6.4 7 ITS 3.2.2 Required Action A.4 2.6.5 7 ITS 3.2.2 Required Action B.1 2.6.6 7 3.2.3 AXIAL FLUX DIFFERENCE AFD Limits 2.7 7 (AFD)___3.3.1 Reactor Trip System (RTS) QTNL, QTPL, QTNS, and QTPS 2.8.1 8 Instrumentation QPNL, QPPL, QPNS, and QPPS 2.8.2 9 3.9.1 Boron Concentration Refueling Boron Concentration 2.9 9 CORE OPERATING LIMITS Aayia ehd 5.6.3 REOT(OR nltclMtos2.0 3 SEQUOYAH-UNIT 1Pae2o16Rvsn1 Page 2 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.0 .OPERATING LIMITS The cycle-specific parameter limits for the TS listed in section 1 .0 are presented in the following subsections.
: 5. 60 ppm Moderator Temperature Coefficient limits were added in "Section 2.2 consistent with the NOTE in TSs LCO 3.1.3, "Moderator Temperature Coefficient," Surveillance Requirement 3.1.3.2.
These limits have been developed using the NRC approved methodologies specified in TS 5.6.3. The versions of the topical reports which describe the methodologies used for this cycle are listed in Table 1.The following abbreviations are used in this section: BOL stands for Beginning of Cycle Life EOL stands for End of Cycle Life RTP stands for RATED THERMAL POWER 2.1 SHUTDOWN MARGIN -SDM (TS 3.1 .1, 3.1.4, 3.1.5, 3.1.6, 3.1.8)2.1.1 For TS 3.1.1, SDM shall be ->1.6 %Ak/k in MODE 2 with keff < 1.0, MODE 3 and MODE 4*2.1.2 For TS 3.1.1, SDM shall be > 1.0 %Ak/k in MODE 5.2.1.3 For TS 3.1.4, SDM shall be > 1.6 %Ak/k in MODE 1 and MODE 2.2.1.4 For TS 3.1.5, SDM shall be >-1.6 %Ak/k in MODE 1 and MODE 2.2.1.5 For TS 3.1.6, SDM shall be --.1.6 %Alk/in MODE 1 and MODE 2 with keff> 1.0.2.1.6 For TS 3.1.8, SDM shall be _> 1.6 %Ak/k in MODE 2.SEQUOYAH-UNIT 1 ae3o 6Rvso Page 3 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.2 Moderator Temperature Coefficient  
: 6. Control Bank Insertion Limits requirement were added in Section 2.4 as necessary for TSs LCO 3.1.6, "Control Bank Insertion Limits," Surveillance Requirements.
-MTC (TS 3.1.3)2.2.1 The BOL MTC limit is: less positive than 2.2.2 The EOL MTC limit is: less negative than or equal to 2.2.3 The 300 ppm Surveillance limit is: less negative than or equal to 2.2.4 The 60 ppm Surveillance limit is: less negative than or equal to-0.05 x10-5 Ak/k/0 F.-4.50 x 10.4 Ak/k/&deg;F.-3.74 x 10-4 Ak/k/&deg;F.-4.15 xl10 Ak/k/0 F.2.3 Shutdown Bank Insertion Limits (TS 3.1.5)2.3.1 Each shutdown bank shall be withdrawn to a position as defined below: SEQUOYAH-UNIT 1 ae4o 6Rvso page 4 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.4 Control Bank Insertion Limits (TS 3.1.6)2.4.1 The control banks shall be limited in physical insertion as shown in Figure 1.2.4.2 Each cOntrol bank shall be considered fully withdrawn from the core at>__225 steps.2.4.3 The control banks shall be operated in sequence by withdrawal of Bank A, Bank B, Bank C, and Bank D. The control banks shall be sequenced in reverse order upon insertion.
: 7. Section 2.5 was revised to add information relocated from previous TSs for consistency with approved TSs LCO 3.2.1, "Heat Flux Hot Channel Factor (Fq(X, Y, Z))".
2.4.4 Each control bank not fully withdrawn from the core shall be operated with the following overlap as a function of full out position.Full Out Position (steps) Bank Overlap (steps) Bank Difference (steps)225 97 128 226 98 128 227 99 128 228 100 128 229 101 128 230 102 128 231 103 128 SEQUOYAH-UNIT 1 ae f16Rvso Page 5 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.5 Heat Flux Hot Channel Factor -FQ(X,Y,Z) (TS 3.2.1)2.5.1 FQRT- 2.62 2.5.2 K(Z) is provided in Figure 2 2.5.3 NSLOPEAFD  
: 8. Section 2.6 was revised to add information relocated from previous TSs for consistency with approved TSs LCO 3.2.2, 'Nuclear Enthalpy Rise Hot Channel Factor F&H(X, Y)".
= 1.21 2.5.4 PSLOPEAFD  
: 9. Power Distribution Limits coefficient definitions, such as BQNOM and BHDES, were eliminated as these are defined in the TS Bases.
= 1.55 2.5.5 NSLOPEf 2 (AI) = 1.48 2.5.6 PSLOPEf 2 (AI) = 2.00 2.5.7 The appropriate factor for increase in FQM(X,Y,Z) for compliance with SR 3.2.1.2 and SR 3.2.1.3 is specified as follows: For all cycle burn ups, use 2.0%2.5.8 ITS LCO 3.2.1 Required Action A.3 reduces the Overpower Delta T Trip setpoints (value of K<4) at least 1 % (in AT span) for each 1 % that FQC(x,Y,Z) exceeds its limit.2.6 Nuclear Enthalpy Rise Hot Channel Factor -FAH(X,Y) (TS 3.2.2)2.6.1 MAP(X,Y,Z) is provided in Table 2.2.6.2 RRH=3.34 when 0.8 <P<1.0 RRH=1.67 whenP<0.8 P = THERMAL POWER / RATED THERMAL POWER RRH = Thermal power reduction required to compensate for each 1% that FAH(X,Y) exceeds its limit.2.6.3 TRH = 0.0334 when 0.8 < P < 1.0 TRH = 0.0167 when P < 0.8 P = THERMAL POWER / RATED THERMAL POWER TRH = Reduction in Overtemperature Delta T K 1 setpoint required to compensate for each 1% that FAH(X,Y) exceeds its limit.SEQUOYAH-UNIT 1Pae6o16RvsnI Page 6 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.6.4 The appropriate factor for increase in FAHM (X,Y) for compliance with-SR 3.2.2.1 and SR 3.2.2.2 is specified as follows: For all cycle burnups, use 2.0%2.6.5 ITS 3.2.2 Required Action A.4 reduces the Overtemperature Delta T setpoint (K 1 term in Table 3.3.1-1) by > TRH multiplied by the FAH min margin.*2.6.6 ITS 3.2.2 Required Action B.1 reduces the Overtemperature Delta T setpoint (K 1 term in Table 3.3.1-1) by >- TRH multiplied by the f 1 (Al)min margin.2.7 AXIAL FLUX DIFFERENCE  
: 10. The boron concentration limit for TSs LCO 3.9.1, 'Boron Concentration," were added to the COLRs consistent with the approved TVA License Amendment Request.
-AFD (TS 3.2.3)2.7.1 The AFD limits are specified in Figure 3 SEQUOYAH-UNIT 1Pae7o16RvsnI Page 7 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.8 Reactor Trip System Instrumentation (TS *3.3.1)2.8.1 Trip Reset Term [f 1 (Al)] for Overtemperature Delta-T Trip*The following parameters are required to specify the power level-dependent f 1 (AI) trip reset term limits for Table 3.3.1-1 (function 6), Overtemperature Delta-T trip function: 2.8.1.1 QTNL = -20%where QTNL = the maximum negative Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
 
2.8.1.2 QTPL = +5%where QTPL = the maximum positive Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
ENCLOSURE 2 SEQUOYAH UNIT 1 CYCLE 21 CORE OPERATING LIMITS REPORT REVISION 1
2.8.1.3 QTNS = 2.50%where QTNS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QTNL).2.8.1.4 QTPS = 1.40%where QTPS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its positive limit at RATED THERMAL POWER (QTPL).SEQUOYAH-UNIT 1 ae8o 6Rvso Page 8 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.8.2 Trip Reset Term [f 2 (AI)] for Overpower Delta-T Trip The following parameters are required to specify the power level-dependent f 2 (AI) trip reset term limits for Table 3.3.1-1 (function 7), Overpower Delta-T trip function:*2.8.2.1 QPNL = -25%where QPNL = the maximum negative Al setpoint at RATED THERMAL *POWER at which the trip setpoint is not reduced by the axial power distribution.
 
2.8.2.2 QPPL = +25%where QPPL = the maximum positive Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
QA Record                                                                             QARcordL36 151009 802 SEQUOYAH UNIT 1 CYCLE 21 CORE OPERATING LIMITS REPORT REVISION 1 October 2015 Prepared by:
2.8.2.3 QPNS = 1.70%where QPNS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QPNL).2.8.2.4 QPPS = 1.70%where QPPS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al> exceeds its positive limit at RATED.THERMAL POWER (QPPL).2.9 Boron Concentration (TS 3.9.1)2.9.1 The refueling boron concentration shall be z 2080 ppm.SEQUOYAH-UNIT 1 ae9o 6Rvso Page 9 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 Table 1 COLR Methodology Topical Reports 1. BAW-10180-A, Revision 1, "NEMO-Nodal Expansion Method Optimized," March 1993.(Methodology for TS 3.1 .1-SHUTDOWN MARGIN, 3.1 .3-Moderator Temperature Coefficient, 3.9.1-Boron Concentration)
Christine A. Setter, PWR Fuel Engineering                                           Date Verified by:
: 2. BAW-10169P-A, Revision 0, "RSG Plant Safety Analysis-B&W Safety Analysis Methodology for Recirculating Steam Generator Plants," October 1989.(Methodology for TS 3.1 .3-Moderator Temperature Coefficient)
John E. Strange, P   R Fuel Engineering Reviewed by:
: 3. BAW-10163P-A, Revision 0, ."Core Operating Limit Methodology for Westinghouse-Designed PWRs," June 1989.(Methodology for TS 3.3.1-Reactor Trip System Instrumentation  
Date Kathl&*i',A  unningham, PW         Fuengneig ManagerL Date radnS. Catalanotto, Reactor Engineering Manager Approved by:
[f 1 (AI), f 2 (AI) limits], 3.1.5-Shutdown Bank Insertion Limits, 3.1.6-Control Bank Insertion Limits, 3.2.1-Heat F~lux Hot Channel Factor, 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.2.3-AXIAL FLUX DIFFERENCE)
                                                                            /   '&,/S Date Revision Pages affected     All Reason for Revision: *Update for Improved Technical Specifications ('ITS) Implementation SEQUOYAH-UNIT 1Pae1o16Rvsn1                   Page 1 of 16                                 Revision 1
: 4. EMF-2328(P)(A), "PWR Small Break LOCA Evaluation Model,"' March 2001.(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)5. BAW-10227P-A, Revision 1, "Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel," June 2003.(Methodology for TS 3.2.1-Hleat Flux Hot Channel Factor)6. BAW-10186P-A, Revision 2, "Extended Burnup Evaluation," June 2003.(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)7. EMF-2103P-A, Revision 0, "Realistic Large Break LOCA Methodology for Pressurized Water Reactors,".
 
April 2003.(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)8. BAW-1 0241 P-A, Revision 1, "BHTP DNB Correlation Applied with LYNXT," July 2005.(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation  
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 1.0       CORE OPERATING LIMITS REPORT This CORE OPERATING LIMITS REPORT (COLR) for Sequoyah Unit I Cycle 21 has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.3.
[f 1 (AI) limits])9. BAW-10199P-A, Revision 0, "The BWU Critical Heat Flux Correlations," August 1996.(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation  
The TSs affected by this Report are listed below:
[f 1 (AI) limits])10. BAW-10189P-A, "CHF Testing and Analysis of the Mark-BW Fuel Assembly Design," January 1996.(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation  
TS                                                                                   COLR COLR Section         Technical Specification                       COLR Parameter             Section Page 3.1.1     SHUTDOWN MARGIN (SDM)                     SDM                                   2.1   3 BOL MTC Limit                       2.2.1   4 3.3 Moderator Temperature                     EOL MTC Limit             "2.2.2             4 313 Coefficient (MTC)                         300 ppm Surveillance Limit           2.2.3   4
[f 1 (AI) limits])1 1. BAW-10159P-A, "BWCMV Correlation of Critical Heat Fluxin Mixing Vane Grid Fuel Assemblies," August .1990.(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation  
________________60                  ppm Surveillance Limit           2.2.4   4 3.1.4     Rod Group Alignment Limits               SDM                                 2.1.3   3 Shutdown Bank Insertion Limits         2.3   4 3.1.5     Shutdown Bank Insertion LimitsSD2.4                                                   3 CotoS BnDnsrinMiit                   2.14   5 3.1.6rConrolnBanknnsertion imitstSD                                           2.1. 3 3.1.8     PHYSICS TESTS Exceptions-               SDM                                 2.1.6   3 MODE 2                       -___________                                       __
[f 1 (AI) limits])12. BAW-10231P-A, Revision 1, "COPERNIC Fuel Rod Design Computer Code," January 2004.(Methodology for TS 3.3.1-Reactor Trip System Instrumentation  
FQ                                  2.5.1   6 K(Z)                                 2.5.2   6 NSLOPEAFD                           2.5.3   6 321 Heat Flux Hot Channel Factor             PSLOPEAFD                           2.5.4   6 321 (F0 (X,Y,Z))                             NSLOPEf 2 (Al)                       2.5.5   6 PSLOPEf 2 (AI)                       2.5.6   6 FQ(X,YZ) Appropriate Factor         2.5.7   6 ITS LCO 3.2.1 Required Action A.3   2.5.8   6 MAP(X,Y,Z)                           2.6.1   6 RRH                                 2.6.2   6 Nuclear Enthalpy Rise Hot                 TRH2.3                                       6 3.2.2263 Channel Factor (FAH(XY))                   FAH(X,Y) Appropriate Factor                 6 2.6.4   7 ITS 3.2.2 Required Action A.4       2.6.5   7 ITS 3.2.2 Required Action B.1       2.6.6   7 3.2.3     AXIAL FLUX DIFFERENCE                     AFD Limits                           2.7   7 (AFD)___
[f 2 (AI) limits])-SEQUOYAH-UNIT 1 ae1 f16Rvso Page 10 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 Table 2 Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation (TS 3.2.2)AXlAL(X,Y)
3.3.1     Reactor Trip System (RTS)                 QTNL, QTPL, QTNS, and QTPS           2.8.1   8 Instrumentation                           QPNL, QPPL, QPNS, and QPPS           2.8.2   9 3.9.1     Boron Concentration                       Refueling Boron Concentration         2.9   9 5.6.3     CORE REOT(OR OPERATING LIMITS                Aayia        ehd nltclMtos2.0                               3 SEQUOYAH-UNIT 1Pae2o16Rvsn1Page 2 of 16                                                 Revision 1
ELEVATION (ft) MAP(X,Y,Z) 1 1.8128 2 1.8125 3 1.8122.4 1.8119 5 1.8115 1.1 6 1.8109 7 1.8106 8 1.8104 9 1.8098 10 1.8092 11 1.7599 1 2.0671 2 2.0664 3 2.0656 4 2.0649 5 2.0642 1.2 6 2.0636 7 2.0624 8 2.0615 9 2.0457 10 1.9492 11 -1.8589 1 2.3433 2 2.3419 3 2.3412 4 2.3397 5 2.3389 1.3 6 2.3381 7 2.3357 8 2.3130 9 2.1886 10 2.0643______11 1.9439 AXIAL(X,Y)
 
ELEVATION (ft) MAP(X,Y,Z) 1 2.5969 2 2.5380 3 2.4827 4 2.4411 5 2.4315 1.4 6 2.4800 7 2.5356 8 2.4447 9 2.3555 10 2.1738 11 2.0238 1 2.6723 2 2.6061 3 2.5417 4 2.4913 5 2.4801 1.5 6 2.5380 7 2.6273 8 2.5311 9 2.4447 10 2.2772 11 2.0975 1 2.7308 2 2.6605 3 2.5947 4 2.5371 5 2.5234 1.6 6 2.5906 7 2.7077 8 2.6117 9 2.5240 10 2.3758 11 2.1662 SEQUOYAH-UNIT 1 ae1 f16Rvso Page 11 of 16 Revision 1 TableFO 2EU A Uont in CYCEd 2 Table 2 (continued)
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.0   .OPERATING LIMITS The cycle-specific parameter limits for the TS listed in section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in TS 5.6.3. The versions of the topical reports which describe the methodologies used for this cycle are listed in Table 1.
AXIAL(X,Y)
The following abbreviations are used in this section:
ELEVATION(ft)
BOL stands for Beginning of Cycle Life EOL stands for End of Cycle Life RTP stands for RATED THERMAL POWER 2.1     SHUTDOWN MARGIN         - SDM (TS 3.1 .1, 3.1.4, 3.1.5, 3.1.6, 3.1.8) 2.1.1   For TS 3.1.1, SDM shall be ->1.6%Ak/k in MODE 2 with keff < 1.0, MODE 3 and MODE 4
MAP(X,Y,Z) 1 2.7664 2 2.7083 3 2.6380 4 2.5791 5 2.5639 1.7 6 2.6359 7 2.7795 8 2.6870 9 " 2.5798 10 2.4726 11 2.2304 1 2.7963 2 2.7466 3 2.6775 4 2.6172 5 2.6010 1.8 6 2.6802 7 2.8456 8 2.7552 9 2.6648 10 2.5655 11 2.2931 1 2.8235 2 2.7739 3 2.7125 4 2.6523 5 2.6328 1.9 6 2.7200 7 2.9065 8 2.8193 9 2.7288 10 2.6384______11 2.3482 AXIAL(X,Y)
        *2.1.2   For TS 3.1.1, SDM shall be > 1.0 %Ak/k in MODE 5.
ELEVATION (if) MAP(X,Y,Z) 1 2.4339 2 2.4060 3 2.3856 4 2.3423 5 2.3114>1.9 6 2.6006 7 2.5003 8 2.4004 9 2.2989 10 2.1483 11 .1.9630 1 2.5057 2 2.4754 3 2.4449 4 2.3591 5 2.4205 2.1 6 2.7643 7 2.6474 8 2.5360 9 2.4400 10 2.3277 11 2.0549 1 2.5380 2 2.5216 3 2.4619 4 2.4294 5 2.4290 2.3 6 2.8222 7 2.7334 8 2.6234 9 2.5186 10 2.4215_____11 2.1250 SEQUOYAH-UNIT I1ae1 f16Rvso Page 12 of 16 Revision 1 TableFO 2EU A UcnItin CYCEd 2 Table 2 (continued)
2.1.3   For TS 3.1.4, SDM shall be > 1.6 %Ak/k in MODE 1 and MODE 2.
AXIAL(X,Y)
2.1.4   For TS 3.1.5, SDM shall be >-1.6 %Ak/k in MODE 1 and MODE 2.
ELEVATION (ft) MAP(X,Y,Z) 1 2.6440 2 2.5160 3 2.5045 4 2.4488 5 2.5803 2.5 6 2.9481 7 2.8544 8 2.7286 9 2.6450 10 2.5527 11 2.1731 1 2.5554 2 2.5529 3 2.5197 4 2.4375 5 2.5643 2.7 6 2.9839 7 2.8837 8 2.7939 9 2.7040 10 2.5997 11 2.1995 1 2.4223 2 2.5653 3 2.5075 4 2.3955 5 2.7295 2.9 6 3.0921 7 3.0070 8 2.8896 9 2.8058 10 2.6974_____11 2.2039 AXIAL(X,Y)
2.1.5   For TS 3.1.6, SDM shall be --.1.6 %Alk/
ELEVATION (ft) MAP(X,Y,Z) 1 2.2448 2 2.5535 3 2.4678 4 2.3229 5 2.8913 3.1 6 3.1515 7 3.0181 8 2.9699 9 2.8941 10 2.7819 11 2.1866 1 2.0228 2 2.5172 3 2.4007 4 2.2195 5 3.0496 3.3 6 3.2226 7 3.1446 8 3.0350 9 2.9688 10 2.8533 11 2.1473 1 1.7563 2 2.4566 3 2.3062 4 2.0854 5 3.2045 3.5 6 3.2929 7 3.2627 8 3.0846 9 3.0299* 10 2.9117_____11 2.0862 SEQUOYAH-UNIT 1 Pg 3o 6Rvso Page 13 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 231 220(FuI~y Withdn~wn Regior~ (575~225)p --'Inn I 0-Cl)rm 0/ ABANK D 820 400 20 __ _ _ _ _40 (Fully Inserted)0.2 0.4 0.6 0_8 I Fraction of RATED THERMAL POWER FIGURE 1 Rod Bank Insertion Limits Versus THERMAL POWER, Four Loop Operation (TS 3.1.6)* Fully withdrawn region shall be the condition where shutdown and control banks are at a position within the interval of 225 and <231 steps withdrawn, inclusive.
in MODE 1 and MODE 2 with keff> 1.0.
Fully withdrawn shall be the position as defined below Cycle Burnup (MWd/mtU)>0 Steps Withdrawn-> 225 to < 231 This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.
2.1.6   For TS 3.1.8, SDM shall be _>1.6 %Ak/k in MODE 2.
If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1 .3% in power, and the rod insertion limit lines must be increased by 3 steps withdrawn until the LEFM is returned to operation.
SEQUOYAH-UNIT 1                     ae3o Page        6Rvso 3 of 16                         Revision 1
SEQUOYAH-UNIT 1 ae1 f16Rvso Page 14 of 16 Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 1.2 1.0 0.8 0.6 0.4 0.2 0.0 Eeaio K Iz)( )0.00 1000 6,25 1000\ I I i I Elvaio K!z 0 2 4 6-Core Height (Feet)8 10 12 FIGURE 2 K(Z) -Normalized FQ(X,Y,Z) as a Function of Core Height (TS 3.2.1)SEQUOYAH-UNIT 1 Page 15 of 16 Rvso Revision 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 a.0 0 0.'I I-a'U II-0 120 110 100 90 80 70 60 50 40 30 20 10 0 I II I I (710) UnaccieptableI_
 
--hOpe rationI-_ -. I_S I I 1 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 I q]I I L I I I' ! i '-50-40 20 -10 0 10 20 30 Flux Difference (Al) %FIGURE 3 AXIAL FLUX DIFFERENCE Limits As A Function of RATED THERMAL POWER For Burnup Range 0 EFPD to EOL (TS 3.2.3)40 50 This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.2   Moderator Temperature Coefficient     - MTC (TS 3.1.3) 2.2.1   The BOL MTC limit is: ,*
less positive than                 -0.05 x10-5 Ak/k/ 0 F.
2.2.2   The EOL MTC limit is:
less negative than or equal to     -4.50 x 10.4 Ak/k/&deg;F.
2.2.3   The 300 ppm Surveillance limit is:
less negative than or equal to     -3.74 x 10-4 Ak/k/&deg;F.
2.2.4   The 60 ppm Surveillance limit is:
less negative than or equal to     -4.15 xl10  Ak/k/0 F.
2.3   Shutdown Bank Insertion Limits (TS 3.1.5) 2.3.1   Each shutdown bank shall be withdrawn to a position as defined below:
SEQUOYAH-UNIT 1                 ae4o page        6Rvso 4 of 16                         Revision 1
 
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.4   Control Bank Insertion Limits (TS 3.1.6) 2.4.1     The control banks shall be limited in physical insertion as shown in Figure 1.
2.4.2     Each cOntrol bank shall be considered fully withdrawn from the core at>__225 steps.
2.4.3     The control banks shall be operated in sequence by withdrawal of Bank A, Bank B, Bank C, and Bank D. The control banks shall be sequenced in reverse order upon insertion.
2.4.4     Each control bank not fully withdrawn from the core shall be operated with the following overlap as a function of full out position.
Full Out Position (steps)     Bank Overlap (steps)       Bank Difference (steps) 225                         97                           128 226                         98                           128 227                         99                           128 228                         100                           128 229                         101                           128 230                         102                           128 231                         103                           128 SEQUOYAH-UNIT 1                     ae 5 off16Rvso Page     16                           Revision 1
 
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.5   Heat Flux Hot Channel Factor - FQ(X,Y,Z) (TS 3.2.1) 2.5.1   FQRT-         2.62 2.5.2   K(Z) is provided in Figure 2 2.5.3   NSLOPEAFD =         1.21 2.5.4   PSLOPEAFD =         1.55 2.5.5   NSLOPEf2 (AI) =     1.48 2.5.6   PSLOPEf 2(AI) =     2.00 2.5.7   The appropriate factor for increase in FQM(X,Y,Z) for compliance with SR 3.2.1.2 and SR 3.2.1.3 is specified as follows:
For all cycle burn ups, use 2.0%
2.5.8   ITS LCO 3.2.1 Required Action A.3 reduces the Overpower Delta T Trip setpoints (value of K< 4) at least 1% (in AT span) for each 1% that FQC(x,Y,Z) exceeds its limit.
2.6   Nuclear Enthalpy Rise Hot Channel Factor - FAH(X,Y) (TS 3.2.2) 2.6.1   MAP(X,Y,Z) is provided in Table 2.
2.6.2   RRH=3.34       when 0.8 <P<*1.0 RRH=1.67         whenP<0.8 P = THERMAL POWER / RATED THERMAL POWER RRH = Thermal power reduction required to compensate for each 1% that FAH(X,Y) exceeds its limit.
2.6.3   TRH = 0.0334 when 0.8 < P < 1.0 TRH = 0.0167 when P < 0.8 P = THERMAL POWER / RATED THERMAL POWER TRH = Reduction in Overtemperature Delta T K1 setpoint required to compensate for each 1% that FAH(X,Y) exceeds its limit.
SEQUOYAH-UNIT 1Pae6o16RvsnIPage 6 of 16                               Revision 1
 
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.6.4   The appropriate factor for increase in FAHM (X,Y) for compliance with-SR 3.2.2.1 and SR 3.2.2.2 is specified as follows:
For all cycle burnups, use 2.0%
2.6.5   ITS 3.2.2 Required Action A.4 reduces the Overtemperature Delta T setpoint (K1 term in Table 3.3.1-1) by > TRH multiplied by the FAH min margin.
      *2.6.6   ITS 3.2.2 Required Action B.1 reduces the Overtemperature Delta T setpoint (K1 term in Table 3.3.1-1) by >-TRH multiplied by the f1(Al) min margin.
2.7   AXIAL FLUX DIFFERENCE       - AFD (TS 3.2.3) 2.7.1   The AFD limits are specified in Figure 3 SEQUOYAH-UNIT 1Pae7o16RvsnIPage 7 of 16                             Revision 1
 
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.8   Reactor Trip System Instrumentation (TS *3.3.1) 2.8.1       Trip Reset Term [f1(Al)] for Overtemperature Delta-T Trip
      *The following parameters are required to specify the power level-dependent f1(AI) trip reset term limits for Table 3.3.1-1 (function 6), Overtemperature Delta-T trip function:
2.8.1.1     QTNL = -20%
where QTNL     =   the maximum negative Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
2.8.1.2     QTPL = +5%
where QTPL     =   the maximum positive Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
2.8.1.3   QTNS   = 2.50%
where QTNS     =   the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QTNL).
2.8.1.4   QTPS   = 1.40%
where QTPS     =   the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its positive limit at RATED THERMAL POWER (QTPL).
SEQUOYAH-UNIT 1                     ae8o Page     8 of 166Rvso                    Revision 1
 
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.8.2       Trip Reset Term [f2 (AI)] for Overpower Delta-T Trip The following parameters are required to specify the power level-dependent f2(AI) trip reset term limits for Table 3.3.1-1 (function 7),
Overpower Delta-T trip function:
          *2.8.2.1     QPNL = -25%
where QPNL   = the maximum negative Al setpoint at RATED THERMAL *POWER at which the trip setpoint is not reduced by the axial power distribution.
2.8.2.2     QPPL = +25%
where QPPL   = the maximum positive Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
2.8.2.3     QPNS   = 1.70%
where QPNS     = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QPNL).
2.8.2.4     QPPS = 1.70%
where QPPS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al
                                    > exceeds its positive limit at RATED.THERMAL POWER (QPPL).
2.9   Boron Concentration (TS 3.9.1) 2.9.1       The refueling boron concentration shall be z 2080 ppm.
SEQUOYAH-UNIT 1                     ae9o Page   9 of 166Rvso                    Revision 1
 
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 Table 1 COLR Methodology Topical Reports
: 1. BAW-10180-A, Revision 1, "NEMO-Nodal Expansion Method Optimized," March 1993.
(Methodology for TS 3.1 .1-SHUTDOWN MARGIN, 3.1 .3-Moderator Temperature Coefficient, 3.9.1-Boron Concentration)
: 2. BAW-10169P-A, Revision 0, "RSG Plant Safety Analysis-B&W Safety Analysis Methodology for Recirculating Steam Generator Plants," October 1989.
(Methodology for TS 3.1 .3-Moderator Temperature Coefficient)
: 3. BAW-10163P-A, Revision 0, ."Core Operating Limit Methodology for Westinghouse-Designed PWRs," June 1989.
(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f1 (AI), f2(AI) limits],
3.1.5-Shutdown Bank Insertion Limits, 3.1.6-Control Bank Insertion Limits, 3.2.1-Heat F~lux Hot Channel Factor, 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.2.3-AXIAL FLUX DIFFERENCE)
: 4. EMF-2328(P)(A), "PWR Small Break LOCA Evaluation Model,"' March 2001.
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
: 5. BAW-10227P-A, Revision 1, "Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel," June 2003.
(Methodology for TS 3.2.1-Hleat Flux Hot Channel Factor)
: 6. BAW-10186P-A, Revision 2, "Extended Burnup Evaluation," June 2003.
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
: 7. EMF-2103P-A, Revision 0, "Realistic Large Break LOCA Methodology for Pressurized Water Reactors,". April 2003.
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
: 8. BAW-1 0241 P-A, Revision 1, "BHTP DNB Correlation Applied with LYNXT," July 2005.
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])
: 9. BAW-10199P-A, Revision 0, "The BWU Critical Heat Flux Correlations," August 1996.
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])
: 10. BAW-10189P-A, "CHF Testing and Analysis of the Mark-BW Fuel Assembly Design,"
January 1996.
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])
1 1. BAW-10159P-A, "BWCMV Correlation of Critical Heat Fluxin Mixing Vane Grid Fuel Assemblies," August .1990.
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])
: 12. BAW-10231P-A, Revision 1, "COPERNIC Fuel Rod Design Computer Code," January 2004.
(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f2 (AI) limits])-
SEQUOYAH-UNIT 1                     ae110 off16Rvso Page           16                       Revision 1
 
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 Table 2 Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation (TS 3.2.2)
AXlAL(X,Y)   ELEVATION (ft) MAP(X,Y,Z)        AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) 1           1.8128                           1          2.5969 2           1.8125                           2          2.5380 3           1.8122.                         3          2.4827 4           1.8119                           4          2.4411 5           1.8115                           5          2.4315 1.1             6           1.8109             1.4          6          2.4800 7           1.8106                           7          2.5356 8           1.8104                           8          2.4447 9           1.8098                           9          2.3555 10           1.8092                         10          2.1738 11           1.7599                         11          2.0238 1           2.0671                           1          2.6723 2           2.0664                           2          2.6061 3           2.0656                           3          2.5417 4           2.0649                           4          2.4913 5           2.0642                           5          2.4801 1.2             6           2.0636             1.5          6          2.5380 7           2.0624                           7          2.6273 8           2.0615                           8          2.5311 9           2.0457                           9          2.4447 10           1.9492                         10          2.2772 11         - 1.8589                         11          2.0975 1           2.3433                           1          2.7308 2           2.3419                         2          2.6605 3           2.3412                           3          2.5947 4           2.3397                         4          2.5371 5           2.3389                         5          2.5234 1.3             6           2.3381             1.6          6          2.5906 7           2.3357                         7          2.7077 8           2.3130                           8          2.6117 9           2.1886                           9          2.5240 10           2.0643                          10          2.3758
______11                    1.9439                         11          2.1662 SEQUOYAH-UNIT 1                    ae111 off16Rvso Page        16                    Revision 1
 
Uont in    CYCEd2 2EUA TableFO Table 2 (continued)
AXIAL(X,Y) ELEVATION(ft) MAP(X,Y,Z)      AXIAL(X,Y)      ELEVATION (if) MAP(X,Y,Z) 1       2.7664                                1          2.4339 2       2.7083                                2          2.4060 3        2.6380                                3           2.3856 4        2.5791                                4           2.3423 5        2.5639                                5           2.3114 1.7            6       2.6359              >1.9             6          2.6006 7        2.7795                                7          2.5003 8        2.6870                                8          2.4004 9    "  2.5798                                9          2.2989 10        2.4726                              10          2.1483 11        2.2304                              11    .      1.9630 1        2.7963                                1          2.5057 2        2.7466                                2          2.4754 3        2.6775                                3          2.4449 4        2.6172                              4          2.3591 5        2.6010                                5          2.4205 1.8            6        2.6802              2.1             6          2.7643 7        2.8456                                7         2.6474 8       2.7552                                8          2.5360 9        2.6648                              9          2.4400 10        2.5655                              10         2.3277 11        2.2931                              11         2.0549 1       2.8235                                1         2.5380 2         2.7739                              2          2.5216 3        2.7125                              3          2.4619 4        2.6523                              4           2.4294 5        2.6328                              5           2.4290 1.9          6         2.7200              2.3            6          2.8222 7        2.9065                              7          2.7334 8        2.8193                              8          2.6234 9        2.7288                              9          2.5186 10        2.6384                              10          2.4215
______11                2.3482                _____11                    2.1250 SEQUOYAH-UNIT I1ae1          Page 12 off16Rvso 16                        Revision 1
 
2 2EUA    UcnItinCYCEd TableFO Table 2 (continued)
AXIAL(X,Y)  ELEVATION (ft) MAP(X,Y,Z)      AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) 1         2.6440                            1          2.2448 2        2.5160                            2         2.5535 3         2.5045                            3          2.4678 4        2.4488                          4          2.3229 5        2.5803                            5          2.8913 2.5            6        2.9481            3.1           6          3.1515 7        2.8544                            7          3.0181 8        2.7286                            8          2.9699 9        2.6450                            9          2.8941 10        2.5527                          10          2.7819 11        2.1731                          11          2.1866 1        2.5554                            1          2.0228 2        2.5529                            2          2.5172 3        2.5197                            3         2.4007 4        2.4375                          4           2.2195 5        2.5643                            5         3.0496 2.7            6        2.9839            3.3            6         3.2226 7        2.8837                            7         3.1446 8         2.7939                            8          3.0350 9        2.7040                            9         2.9688 10        2.5997                          10         2.8533 11        2.1995                          11          2.1473 1        2.4223                            1          1.7563 2         2.5653                          2          2.4566 3        2.5075                          3           2.3062 4         2.3955                          4          2.0854 5        2.7295                          5           3.2045 2.9            6        3.0921            3.5          6          3.2929 7          3.0070                          7          3.2627 8         2.8896                          8          3.0846 9         2.8058                          9          3.0299 10         2.6974
* 10          2.9117
_____11                2.2039              _____11                  2.0862 SEQUOYAH-UNIT 1              Pg 13 Page    3oof 16 6Rvso                Revision 1
 
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 231
{Fu]* %%%hdr'a*.* RegiGn)*                (.575*225}
220                      p Regior~
(FuI~y Withdn~wn                -        (575~225)
                'Inn I 14160/'*B 0-
                                                  /      ABANK                            D Cl) 820 rm 0
400 20                                                                          __ _  _ _ _
40 0.2               0.4              0.6           0_8            I (Fully Inserted)
Fraction of RATED THERMAL POWER FIGURE 1 Rod Bank Insertion Limits Versus THERMAL POWER, Four Loop Operation (TS 3.1.6)
* Fully withdrawn region shall be the condition where shutdown and control banks are at a position within the interval of &#x17d;225 and <231 steps withdrawn, inclusive.
Fully withdrawn shall be the position as defined below Cycle Burnup (MWd/mtU)                                Steps Withdrawn
                        >0                                            ->225 to < 231 This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.
If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the rod insertion limit lines must be increased by 3 steps withdrawn until the LEFM is returned to operation.
SEQUOYAH-UNIT 1                                  ae114 off16Rvso Page      16                            Revision 1
 
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 1.2 1.0 Eeaio        K        Iz) 0.8
(         )
0.00    1000 6,25  1000 0.6
                                \                        I 0.4                                        I i
I Elvaio          K!z 0.2 0.0 0        2               4            6-      8   10         12 Core Height (Feet)
FIGURE 2 K(Z) - Normalized FQ(X,Y,Z) as a Function of Core Height (TS 3.2.1)
SEQUOYAH-UNIT 1                    Page 15 of 16                Revision 1 Rvso
 
COLR FOR SEQUOYAH UNIT 1 CYCLE 21 120                  COLR FOR SEQUOYAH UNIT 1 CYCLE 21 I          II      I        I 110 100 (710) UnaccieptableI_
90
                                                              -        -  hOpe rationI a.
0  80 0
0.
70                                            -        _                                                                            -. I_
          'I 60 I-a'U  50 II-0  40 30
                              ]
I       q            L I
20           I                    I S I        I1 10 I                    I 0                               '      !      i      '
                    -50    -40    -30    -20    -10      0     10      20    30    40    50 Flux Difference (Al) %
FIGURE 3 AXIAL FLUX DIFFERENCE Limits As A Function of RATED THERMAL POWER For Burnup Range 0 EFPD to EOL (TS 3.2.3)
This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.
If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the AFD limit lines must be made more restrictive by 1% in AFD until the LEFM is returned to operation.
If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the AFD limit lines must be made more restrictive by 1% in AFD until the LEFM is returned to operation.
SEQUOYAH-UNIT 1 Pg 6o 6Rvso Page 16 of 16 Revision 1 ENCLOSURE 3 SEQUOYAH UNIT 2 CYCLE 20 CORE OPERATING LIMITS REPORT REVISION 1 QA Record QA RcordL36 151009 803 SEQUOYAH UNIT 2 CYCLE 20 CORE OPERATING LIMITS REPORT REVISION I October 2015 Prepared by: Christine A. Setter, PWR Fuel Engineering Date Verified by:/P,5R Fuel Engineering DatO! e Reviewed by: K PWR Fuel Engineering Manager Date Brandon S. Catalanotto, Reactor Engineering Manager Date/ /Approved by: PORC Chairman Date Plant Manager 'Date Revision .._1 Pages affected All Reason for Revision:
SEQUOYAH-UNIT 1                           Pg 166oof 16 Page          6Rvso                         Revision 1
Update for Improved Technical Specifications (ITS) Implementation SEQUOYAH-UNJT 2Pae1o17Rvsn1 Page 1 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 1.0 CORE OPERATING LIMITS REPORT This CORE OPERATING LIMITS REPORT (COLR) for Sequoyah Unit 2 Cycle 20 has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.3.The TSs affected by this Report are listed below: TS COLR COLR Section Technical Specification COLR Parameter Section Page 3.1.1 SHUTDOWN MARGIN (SDM) SDM 2.1 3 BOL MTC Limit 2.2.1 4 313 Moderator Temperature EOL MTC Limit 2.2.2 4 Coefficient (MTC) 300Oppm Surveillance Limit 2.2.3 4 60 ppm Surveillance Limit 2.2.4 4 3.1.4 Rod Group Alignment Limits SDM 2.1.3 3 Shutdown Bank Insertion Limits 2.3 4 3.1.5 Shutdown Bank Insertion LimitsSD214 3 CotoS anDnetinLmt 2..4 5 3.1.6rCntrolnBnkIInsetionnLiitsiSs 2.14 3 3.1.8 PHYSICS TESTS Exceptions  
 
-SDM 2.1.6 3 MODE 2 FTP 2.5.1 6 K(Z) 2.5.2 6 NSLOPEAFD 2.5.3 6 321 Heat Flux Hot ChanneiFactor PSLOPEAFD 2.5.4 6 (F 0 (X,Y,Z)) NSLOPEf 2 (AI) 2.5.5 6 PSLOPEf 2 (AI) 2.5.6 6 FQ(X,Y,Z)
ENCLOSURE 3 SEQUOYAH UNIT 2 CYCLE 20 CORE OPERATING LIMITS REPORT REVISION 1
Appropriate Factor 2.5.7 6___________________ITS LCO 3.2.1 Required Action A.3 2.5.8 6 MAP(X,Y,Z) 2.6.1 6 RRH 2.6.2 6 322 Nuclear Enthalpy Rise Hot TRH 2.6.3 6 Channel Factor (FAH(X,Y))
 
FAH(X,Y) Appropriate Factor 2.6.4 7 ITS 3.2.2 Required Action A.4 2.6.5 7 ITS 3.2.2 Required Action B.1 2.6.6 7 323 AXIAL FLUX DIFFERENCE AOLmt .(AFD) _ _ _ _ _ _ _ _ _ _ _331 Reactor Trip System (RTS) QTNL, QTPL, QTNS, and QTPS 2.8.1 8 Instrumentation QPNL, QPPL, QPNS, and QPPS 2.8.2 9 3.9.1 Boron Concentration Refueling Boron Concentration 2.9 9 CORE OPERATING LlMITS Aayia ehd 5.6.3 REOT(OR nltclMtos2.0 3 SEQUOYAH-UNIT 2Pae2o17Risn1 Page 2 of 17 Revision 1 COLR FoR SEQUOYAH UNIT 2 CYCLE 20 2.0 OPERATING LIMITS The cycle-specific parameter limits for the TS listed in section 1 .0 are presented in the following subsections.
QA Record                                                                               QARcordL36 151009 803 SEQUOYAH UNIT 2 CYCLE 20 CORE OPERATING LIMITS REPORT REVISION I October 2015 Prepared by:
These limits have been developed using the NRC approved methodologies specified in TS 5.6.3. The versions of the topical reports which describe the methodologies used for this cycle are listed in Table 1.The following abbreviations are used in this section:, BOL stands for Beginning of Cycle Life EOL stands for End of Cycle Life RTP stands for RATED THERMAL POWER 2.1 SHUTDOWN MARGIN -SOM (TS 3.1.1, 3.1.4, 3.1.5, 3.1.6, 3.1.8)2.1.1 For TS 3.1.1, SOM shall be >_1.6 %Ak/k in MODE 2 with keff < 1.0, MODE 3 and MODE 4 2.1.2 For TS 3.1.1, SDM shall be >_1.0 %Ak/k in MODE 5.2.1.3 For TS 3.1.4, SDM shall be >1.6 %Ak/k in MODE 1 and MODE 2.2.1.4 For TS 3.1.5, SDM shall be >_1.6 %Ak/k in MODE 1 and MODE 2.2.1.5 For TS 3.1.6, SDM shall be >__1.6 %Ak/k in MODE 1 and MODE 2 with keff> 1.0.2.1.6 For TS 3.1.8, SDM shall, be >_.1.6 %Ak/k in MODE 2.SEQUOYAH-UNIT 2Pae3o17RvsnI Page 3 of 17.Revision 1
Christine A. Setter, PWR Fuel Engineering                                         Date Verified by:
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.2 Moderator Temperature Coefficient  
Jol*E.Strange., P,5R* Fuel Engineering                               /            DatO!e Reviewed by:
-MTC (TS 3.1.3)2.2.1 The BOL MTC limit is: less positive than 2.2.2 The EOL MTC limit is: less negative than or equal to 2.2.3 The 300 ppm Surveillance limit is: less negative than or equal to 2.2.4 The 60 ppm Surveillance limit is: less negative than or equal to-0.16 x10-5 Ak/k/&deg;F.-4.50 x 1 0 A Ak/k/&deg;F.-3.75 x 1 04 Ak/k/&deg;F.-4.20 x10A Ak/k/&deg;F.2.3 Shutdown Bank Insertion Limits (TS 3.1.5)2.3.1 Each shutdown bank shall be withdrawn to a position as defined below: SEQUOYAH-UNIT 2Pae4o17RvsnI
K   *he1A.Cnigam, PWR Fuel Engineering Manager                                   Date Brandon S. Catalanotto, Reactor Engineering Manager                               Date/
* Page 4 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.4 Control Bank Insertion Limits (TS 3.1.6)2.4.1 The control banks Shall be limited in physical insertion as shown in Figure 1.2.4.2 Each control bank shall be considered fully withdrawn from the core at>__225 steps.2.4.3 The control banks shall be operated in sequence by withdrawal of Bank A, Bank B, Bank C, and Bank 0. The control banks shall be sequenced in reverse order upon insertion.
                                                                                      /
2.4.4 Each control bank not fully withdrawn from the core shall be operated with the following overlap as a function of full out position.Full Out Position Bank Overlap Bank Difference (ts) (steps) (steps)225 9712 226 9812 227 99 128__________
Approved by:
228 100 128 229 101 128 230 102 128 231 103 "128 SEQUOYAH-UNIT 2Pae5o17RvsnI Page 5 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.5 Heat Flux Hot Channel Factor- FQ(X,Y,Z) (TS 3.2.1)RTP 2.5.1 FQ = 2.62 2.5.2 K(Z) is provided in Figure 2 2.5.3 NsLoPEAFD  
PORC Chairman                                                                     Date Plant Manager                                                               'Date Revision .. _1 Pages affected   All Reason for Revision: Update for Improved Technical Specifications (ITS) Implementation SEQUOYAH-UNJT 2Pae1o17Rvsn1                 Page 1 of 17                                   Revision 1
= 1.44 2.5.4 PSLOPEAFD  
 
= 1.76-2.5.5 NSLOPEf 2 (/I) = 1.48 2.5.6 PSLOPEf 2 (AI) = 2.98 M 2.5.7 The appropriate factor for increase in FQ (X,Y,Z) for compliance with SR 3.2.1.2 and SR 3.2.1.3 is specified as follows: For cycle burnups: 0 to 3312 MWd/mtU, use 2.0%For cycle burnups: > 3312 to 3864 MWd/mtU, use 2.12%For cycle* burnups: > 386,4 MWd/mtU, use 2.0%2.5.8 ITS LCO 3.2.1 Required Action A.3 reduces the Overpower Delta T Trip setpoints (value of K 4) at least 1% (in AT span) for each 1% that FQC(X,Y,Z) exceeds its limit.2.6 Nuclear Enthalpy Rise Hot Channel Factor -FAH(X,Y) (TS 3.2.2)2.6.1 MAP(X,Y,Z) is provided in Tables 2a and 2b.2.6.2 RRH = 3.34 when 0.8 < P_ 1.0 RRHIl.67 whenP<0.8 P = THERMAL POWER / RATED THERMAL POWER RRH = Thermal power reduction required to compensate for each*1% that FAH(X,Y) exceeds its limit.2.6.3 TRH = 0.0334 when 0.8 < P < 1.0 TRH = 0.01 67 when P < 0.8 P = THERMAL POWER I RATED THERMAL POWER TRH = Reduction in Overtemperature Delta T K 1 setpoint required to compensate for each 1 % that FAH(X,Y) exceeds its limit.SEQUOYAH-UNIT 2 Pg f1 Page 6 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.6.4 The appropriate factor for increase in FAHM (X,Y) for compliance with SR 3.2.2.1 and SR 3.2.2.2 is specified as follows: For all cycle burnups, use 2.0%: 2.6.5 ITS 3.2.2 Required Action A.4 reduces the overtemperature Delta T setpoint (K 1 term in Table 3.3.1-1) by > TRH multiplied by the FAN min margin.2.6.6 ITS 3.2.2 Required Action 8.1 reduces the Overtemperature Delta T setpoint (K 1 term in Table 3.3.1-1) by > TRH multiplied by the f 1 (Al)min margin.2.7 AXIAL FLUX DIFFERENCE  
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 1.0         CORE OPERATING LIMITS REPORT This CORE OPERATING LIMITS REPORT (COLR) for Sequoyah Unit 2 Cycle 20 has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.3.
-AFD (TS 3.2.3)2.7.1 The AFD limits are specified in Figure 3 SEQUOYAH-UNIT 2Pae7o17RvsnI Page 7 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.8 Reactor Trip System Instrumentation (TS 3.3.1)2.8.1 Trip Reset Term [f 1 (AI)] for Overtemperature Delta-T Trip The following parameters are required to specify the power level-dependent f 1 (AI) trip reset term limits for Table 3.3.1-1 (function 6), Overtemperature Delta-T trip function: 2.8.1 .1 QTNL = -20%where QTNL = the maximum negative Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
The TSs affected by this Report are listed below:
2.8.1.2 QTPL = +5%where QTPL = the maximum positive AlI setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
TS                                                                                   COLR     COLR Section         Technical Specification                   COLR Parameter             Section   Page 3.1.1     SHUTDOWN MARGIN (SDM)                 SDM                                   2.1     3 BOL MTC Limit                       2.2.1     4 313 Moderator Temperature                   EOL MTC Limit                       2.2.2     4 Coefficient (MTC)                     300Oppm Surveillance Limit           2.2.3     4 60 ppm Surveillance Limit             2.2.4     4 3.1.4     Rod Group Alignment Limits           SDM                                   2.1.3     3 Shutdown Bank Insertion Limits         2.3     4 3.1.5     Shutdown Bank Insertion LimitsSD214                                                   3 CotoS anDnetinLmt                     2..4     5 3.1.6rCntrolnBnkIInsetionnLiitsiSs                                         2.14     3 3.1.8     PHYSICS TESTS Exceptions           - SDM                                   2.1.6     3 MODE 2 FTP                                 2.5.1     6 K(Z)                                 2.5.2     6 NSLOPEAFD                             2.5.3     6 321 Heat Flux Hot ChanneiFactor             PSLOPEAFD                           2.5.4     6 (F0 (X,Y,Z))                         NSLOPEf 2 (AI)                       2.5.5     6 PSLOPEf 2 (AI)                       2.5.6     6 FQ(X,Y,Z) Appropriate Factor         2.5.7     6
2.8.1.3 QTNS = 2.50%where QTNS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QTNL).2.8.1.4 QTPS = 1.40%where QTPS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its positive limit at RATED THERMAL POWER (QTPL).SEQUOYAH-UNIT 2Pae8o17Rvsn1 Page 8 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.8.2 Trip Reset Term [fz(AI)] for Overpower Delta-T Trip The following parameters are required to specify the power level-dependent f 2 (AI)trip reset term limits for Table 3.3.1-1 (function 7), Overpower Delta-T trip function:.2.8.2.1 QPNL =-25%Where QPNL = the maximum negative Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
___________________ITS            LCO 3.2.1 Required Action A.3   2.5.8     6 MAP(X,Y,Z)                           2.6.1     6 RRH                                   2.6.2     6 322 Nuclear Enthalpy Rise Hot             TRH                                   2.6.3     6 Channel Factor (FAH(X,Y))             FAH(X,Y) Appropriate Factor           2.6.4     7 ITS 3.2.2 Required Action A.4         2.6.5     7 ITS 3.2.2 Required Action B.1         2.6.6     7 323 AXIAL FLUX DIFFERENCE                 AOLmt                                   .
2.8.2.2 QPPL = +25%where QPPL = the maximum positive Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
(AFD)                                 _   _ _ _   _   _ _ _ _   _ _
2.8.2.3 QPNS = 1.70%where QPNS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QPNL).2.8.2.4 QPPS = 1.70%where QPPS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al exceeds its positive limit at RATED THERMAL POWER (QPPL).2.9 Boron Concentration (TS 3.9.1)2.9.1 The refueling boron concentration shall be > 2000 ppm.SEQUOYAH-UNIT 2Pae9o17Rvsn1 Page 9 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 Table 1 COLR Methodology Topical Reports 1. BAW-1 0180-A, Revision 1, "NEMO-Nodal Expansion Method Optimized," March 1993.(Methodology for TS 3.1.1-SHUTDOWN MARGIN, 3.1.3-Moderator Temperature Coefficient, 3.9.1-Boron Concentration)-
331 Reactor Trip System (RTS)             QTNL, QTPL, QTNS, and QTPS           2.8.1     8 Instrumentation                       QPNL, QPPL, QPNS, and QPPS           2.8.2     9 3.9.1     Boron Concentration                   Refueling Boron Concentration         2.9     9 5.6.3     CORE REOT(OR OPERATING LlMITS              Aayia nltclMtos2.0 ehd                              3 SEQUOYAH-UNIT 2Pae2o17Risn1 Page 2 of 17                                             Revision 1
: 2. BAW-10169P-A, Revision 0, "RSG Plant Safety Analysis-B&W Safety Analysis Methodology for Recirculating Steam Generator Plants," October 1989.(Methodology for TS 3.1 .3-Moderator Temperature Coefficient)
 
: 3. BAW-1 01 63P-A, Revision 0, "Core Operating Limit Methodology for Westinghouse-Designed PWRs," June 1989.(Methodology for TS 3.3.1-Reactor Trip System Instrumentation  
COLR FoR SEQUOYAH UNIT 2 CYCLE 20 2.0     OPERATING LIMITS The cycle-specific parameter limits for the TS listed in section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in TS 5.6.3. The versions of the topical reports which describe the methodologies used for this cycle are listed in Table 1.
[f 1 (AI), f 2 (AI) limits], 3.1.5-Shutdown Bank Insertion Limits, 3.1.6-Control Bank Insertion Limits, 3.2.1-Heat Flux Hot Channel Factor, 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.2.3-AXIAL FLUX DIFFERENCE)
The following abbreviations are used in this section:,
: 4. EMF-2328(P)(A), "PWR Small Break LOCA Evaluation Model," March 2001.(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)5. BAW-1 0227P-A, Revision 1, "Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel,"' June 2003.(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)6. BAW-10186P-A, Revision 2, "Extended Burnup Evaluation," June 2003.(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)7. EMF-2103P-A, Revision 0, "Realistic Large Break LOCA Methodology for Pressurized Water Reactors," April 2003.(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)8. BAW-1 0241 P-A, Revision 1, "BHTP DNB Correlation Applied with LYNXT," July 2005.(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation  
BOL stands for Beginning of Cycle Life EOL stands for End of Cycle Life RTP stands for RATED THERMAL POWER 2.1     SHUTDOWN MARGIN         - SOM (TS 3.1.1, 3.1.4, 3.1.5, 3.1.6, 3.1.8) 2.1.1   For TS 3.1.1, SOM shall be >_1.6 %Ak/k in MODE 2 with keff < 1.0, MODE 3 and MODE 4 2.1.2   For TS 3.1.1, SDM shall be >_1.0 %Ak/k in MODE 5.
[f 1 (AI) limits])9. BAW-10199P-A, Revision 0, "The BWU Critical Heat Flux Correlations," August 1996.(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation  
2.1.3   For TS 3.1.4, SDM shall be >1.6 %Ak/k in MODE 1 and MODE 2.
[f 1 (AI) limits])10. BAW-10189P-A, "CHF Testing and Analysis of the Mark-BW Fuel Assembly Design," January 1996.(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation  
2.1.4   For TS 3.1.5, SDM shall be >_1.6 %Ak/k in MODE 1 and MODE 2.
[f 1 (Al) limits])11. BAW-1 01 59P-A, "BWCMV Correlation of Critical Heat Flux in Mixing Vane Grid Fuel Assemblies," August 1990.(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation  
2.1.5   For TS 3.1.6, SDM shall be >__1.6 %Ak/k in MODE 1 and MODE 2 with keff> 1.0.
[f 1 (AI) limits])12. BAW-10231 P-A, Revision .1, "COPERNIC Fuel Rod Design Computer Code," January 2004.(Methodology for TS 3.3.1-Reactor Trip System Instrumentation  
2.1.6   For TS 3.1.8, SDM shall, be >_.1.6 %Ak/k in MODE 2.
[f 2 (Al) limits])SEQUOYAH-UNIT 2 Pg 0o 7Rvso Page 10 of 17 Revision 1 CQLR FOR SEQUOYAH UNIT 2 CYCLE 20 Table 2a Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation Advanced W17 HTP T M Fuel (TS 3.2.2)AXIAL(X,Y)
SEQUOYAH-UNIT 2Pae3o17RvsnIPage 3 of 17                                 .Revision 1
ELEVATION (ft) MAP(X,Y,Z) 1 1.8128 2 1.8125 3 1.8122 4 1.8119 5 1.8115 1.1 6 1.8109 7 1.8106 8 1.8104 9 1.8098 10 1.8092______11 1.7599 1 2.0671 2 2.0664 3 2.0656 4 2.0649 5 2.0642 1.2 6 2.0636 7 2.0624 8 2.0615 9 2.0457 10 1.9492_____11 1.8589 1 2.3433 2 2.3419 3 2.3412 4 2.3397 5 2.3389 1.3 6 2.3381-7 2.3357 8 2.3130 9 2.1886 10 2.0643______11 1.9439 AXIAL(X,Y)
 
ELEVATION (ft) MAP(X,Y,Z) 1 2.5969 2 2.5380 3 2.4827 4 2.4411 5 2.4315 1.4 6 2.4800 7 2.5356 8 2.4447 9 2.3555 10 2.1738 11 2.0238 1 2.6723 2 2.6061 3 2.5417 4 2.4913 5 2.4801 1.5 6 2.5380 7 2.6273 8 2.5311 9 2.4447 10 2.2772 11 2.0975 1 2.7308 2 2.6605 3. 2.5947 4 2.5371 5 2.5234 1.6 6 2.5906 7 2.7077 8 2.6117 9 2.5240 10 2.3758_ _ _ _ _11 2.1662 SEQUOYAH-UNIT 2Pae1of7eisnI Page 11 of 17 Revision 1 CO ablFO 2OaH UcnIti2n YCed 20 Table 2a (continued)
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.2   Moderator Temperature Coefficient - MTC (TS 3.1.3) 2.2.1   The BOL MTC limit is:
AXIAL(X,Y)
less positive than               -0.16 x10-5 Ak/k/&deg;F.
ELEVATION (ft) MAP(X,Y,Z) 1 ,2.7664 2 2.7083 3 2.6380 4 2.5791 5 2.5639 1.7 6 2.6359, 7 2.7795 8 2.6870 9 2.5798 10 2.4726 11 2.2304 1 2.7963 2 2.7466 3 2.6775 4 2.6172 5 2.6010 1.8 6 2.6802 7 2.8456 8 2.7552 9 2.6648 10 2.5655 11 2.2931 1 2.8235 2 2.7739 3 2.7125 4 2.6523 5 2.6328 1.9 6 2.7200 7 2.9065 8 2.8193 9 2.7288 10 2.6384_____11 2.3482 AXlAL(X,Y)
2.2.2   The EOL MTC limit is:
ELEVATION (ft) MAP(X,Y,Z) 1 2.4339 2 2.4060 3 2.3856 4 2.3423 5 2.3114>1.9 6 2.6006 7 2.5003 8 2.4004 9 2.2989 10 2.1483_____11 1.9630 1 2.5057 2 2.4754 3 2.4449 4 2.3591 5 2.4205 2.1 6 2.7643 7 2.6474 8 2.5360 9 2.4400 10 2.3277_____11 2.0549 1 2.5380 2 2.5216 3 2.4619 4 2.4294 5 2.4290 2.3 6 2.8222 7 2.7334 8 2.6234 9 2.5186 10 2.4215_____11 2.1250 SEQUOYAH-UNIT 2Pae1of7 Page 12 of 17 Revision 1 TableFO 2OaH UcnIti2nCYLEd 2 Table 2a (continued)
less negative than or equal to     -4.50 x 10 A Ak/k/&deg;F.
AXIAL(X,Y)
2.2.3   The 300 ppm Surveillance limit is:
ELEVATION (ft) MAP(X,Y,Z) 1 2.6440 2 2.5160' 3 2.5045 4 2.4488 5 2.5803 2.5. 6 2.9481 7 2.8544 8 2.7286 9 2.6450 10 2.5527_____11 2.1731 1 2.5554 2 2.5529 3 2.5197 4 2.4375 5 2.5643 2.7 6 2.9839 7 2.8837 8 2.7939 9 2.7040 10 .2.5997 11 2.1995 1 2.4223 2 2.5653 3 2.5075 4 2.3955 5 2.7295 2.9 6 3.0921 7 3.0070 8 2.8896 9 2.8058 10 2.6974_____11 2.2039 AXIAL(X,Y)
less negative than or equal to     -3.75 x 104 Ak/k/&deg;F.
ELEVATION (ft) MAP(X,Y,Z) 1 2.2448 2 2.5535 3 2.4678 4 2.3229 5 2.8913 3.1 6 3.1515 7 3.0181 8 2.9699 9 2.8941 10 2.7819 11 2.1866 1 2.0228 2 2.5172 3 2.4007 4 2.2195 5 3.0496 3.3 6 3.2226 7 3.1446 8 3.0350 9 2.9688 10 2.8533 11 2.1473 1. 1.7563 2 2.4566 3 2.3062 4 2.0854 5 3.2045 3.5 6 3.2929 7 3.2627 8 3.0846 9 .3.0299 10. 2.9117_____11 2.0862 SEQUOYAH-UNIT 2 Pg 3f7Rvso Page 13 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 Table 2b Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation Mark-BW Fuel (TS 3.2.2)AXIAL(X,Y)
2.2.4   The 60 ppm Surveillance limit is:
ELEVATION (ft) MAP(X,Y,Z) 2 1.9343 4 1.9300 1.1 6 1.9234 8 1.9115 10 1.8894 2 2.1663 4 2.1558 1.2 6 2.1410 8 2.1153'10 2,0582 2 *2.4023 4 2.3825 1.3 6 2.3599 8 2.3100_______10 2.1760 2 2.6453 4 2.6136 1.4 6 2.5610 8 2.4199 10 2.2787 2 2.7189 4 2.8181 1.5 6 2.6735 8 2.5280 10 2.3749 2 2.7720 4 2.9219 1.7 6 2.8641 8 2.7064 10 2.5539 AXIAL(X,Y)
less negative than or equal to     -4.20 x10A Ak/k/&deg;F.
ELEVATION (ft) MAP(X,Y,Z) 2 2.8143 4 2.9856 1.9 6 3.0073 8 2.8509 10 2.7048 2 2.4405 4 2.4405>1.9 6 2.7376 8 2.5906 10 2.3456 2 2.5881 4 2.5881 2.2 6 2.9899 8 2.7800 10 2.5367 2 2.6111 4 2.6111 2.6 6 3.2947 8 3.2055 10 2.8049 2 2.9142 4 2.9142 36 4.0216 8 3.6527 10 3.1711 2 2.9618 4 2.9618 3.5 6 4.2351 8 3.7452 10 3.3214 SEQUOYAH-UNIT 2 Pg 4o 7Rvso Page 14 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 r- /~- BA K C/* 140& (u120 8 w100 _______BANK 0D Z80 40 /20, 0 {.09,o) ________ ________ _______ _______0 0.2 0.A 0.6 0_8 (Fully Inserted)Fraction of RATED THERMAL POWER FIGURE 1 Rod Bank Insertion Limits Versus THERMAL POWER, Four Loop Operation (TS 3.1.6)* Fully withdrawn region shall be the condition where shutdown and control banks are at a position within the interval of >225 and <231 steps withdrawn, inclusive.
2.3  Shutdown Bank Insertion Limits (TS 3.1.5) 2.3.1   Each shutdown bank shall be withdrawn to a position as defined below:
Fully withdrawn shall be the position as defined below, Cycle Burnup (MWd/mtU)
SEQUOYAH-UNIT 2Pae4o17RvsnI*Page 4 of 17                           Revision 1
Steps Withdrawn0  225 to -231 This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.
 
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.4   Control Bank Insertion Limits (TS 3.1.6) 2.4.1     The control banks Shall be limited in physical insertion as shown in Figure 1.
2.4.2     Each control bank shall be considered fully withdrawn from the core at>__225 steps.
2.4.3     The control banks shall be operated in sequence by withdrawal of Bank A, Bank B, Bank C, and Bank 0. The control banks shall be sequenced in reverse order upon insertion.
2.4.4     Each control bank not fully withdrawn from the core shall be operated with the following overlap as a function of full out position.
Full Out Position             Bank Overlap                 Bank Difference (ts)           (steps)                   (steps) 225                         9712 226                         9812 227                         99                           128__________
228                         100                           128 229                         101                           128 230                         102                           128 231                         103                           "128 SEQUOYAH-UNIT 2Pae5o17RvsnIPage 5 of 17                                 Revision 1
 
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.5   Heat Flux Hot Channel Factor- FQ(X,Y,Z) (TS 3.2.1)
RTP 2.5.1   FQ     =       2.62 2.5.2   K(Z) is provided in Figure 2 2.5.3   NsLoPEAFD =     1.44 2.5.4   PSLOPEAFD =     1.76-2.5.5   NSLOPEf 2(/I) = 1.48 2.5.6   PSLOPEf 2(AI) = 2.98 M
2.5.7   The appropriate factor for increase in FQ (X,Y,Z) for compliance with SR 3.2.1.2 and SR 3.2.1.3 is specified as follows:
For cycle burnups:           0 to 3312 MWd/mtU,   use 2.0%
For cycle burnups:     > 3312 to 3864 MWd/mtU,     use 2.12%
For cycle* burnups:               > 386,4 MWd/mtU,   use 2.0%
2.5.8     ITS LCO 3.2.1 Required Action A.3 reduces the Overpower Delta T Trip setpoints (value of K4 ) at least 1% (in AT span) for each 1% that FQC(X,Y,Z) exceeds its limit.
2.6   Nuclear Enthalpy Rise Hot Channel Factor - FAH(X,Y) (TS 3.2.2) 2.6.1     MAP(X,Y,Z) is provided in Tables 2a and 2b.
2.6.2     RRH   =   3.34   when 0.8   < P_* 1.0 RRHIl.67         whenP<0.8 P = THERMAL POWER / RATED THERMAL POWER RRH   =   Thermal power reduction required to compensate for each
                          *1% that FAH(X,Y) exceeds its limit.
2.6.3     TRH   = 0.0334 when 0.8   < P < 1.0 TRH   = 0.01 67 when P   < 0.8 P = THERMAL POWER I RATED THERMAL POWER TRH = Reduction in Overtemperature Delta T K1 setpoint required to compensate for each 1% that FAH(X,Y) exceeds its limit.
SEQUOYAH-UNIT 2                 Pg Page 6 off117                        Revision 1
 
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.6.4   The appropriate factor for increase in FAHM (X,Y) for compliance with SR 3.2.2.1 and SR 3.2.2.2 is specified as follows:
For all cycle burnups, use 2.0%:
2.6.5   ITS 3.2.2 Required Action A.4 reduces the overtemperature Delta T setpoint (K1 term in Table 3.3.1-1) by > TRH multiplied by the FAN min margin.
2.6.6   ITS 3.2.2 Required Action 8.1 reduces the Overtemperature Delta T setpoint (K1 term in Table 3.3.1-1) by > TRH multiplied by the f1 (Al) min margin.
2.7   AXIAL FLUX DIFFERENCE       - AFD (TS 3.2.3) 2.7.1   The AFD limits are specified in Figure 3 SEQUOYAH-UNIT 2Pae7o17RvsnI Page 7 of 17                           Revision 1
 
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.8   Reactor Trip System Instrumentation (TS 3.3.1) 2.8.1     Trip Reset Term [f1(AI)] for Overtemperature Delta-T Trip The following parameters are required to specify the power level-dependent f1(AI) trip reset term limits for Table 3.3.1-1 (function 6), Overtemperature Delta-T trip function:
2.8.1 .1   QTNL   = -20%
where QTNL     = the maximum negative Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
2.8.1.2   QTPL = +5%
where QTPL   = the maximum positive AlI setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
2.8.1.3   QTNS = 2.50%
where QTNS     = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QTNL).
2.8.1.4     QTPS   = 1.40%
where QTPS     = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its positive limit at RATED THERMAL POWER (QTPL).
SEQUOYAH-UNIT 2Pae8o17Rvsn1Page 8 of 17                                     Revision 1
 
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.8.2     Trip Reset Term [fz(AI)] for Overpower Delta-T Trip The following parameters are required to specify the power level-dependent f2 (AI) trip reset term limits for Table 3.3.1-1 (function 7), Overpower Delta-T trip function:
            .2.8.2.1   QPNL =-25%
Where QPNL     = the maximum negative Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
2.8.2.2   QPPL   = +25%
where QPPL     = the maximum positive Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
2.8.2.3   QPNS   = 1.70%
where QPNS     =   the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QPNL).
2.8.2.4   QPPS   = 1.70%
where QPPS     = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al exceeds its positive limit at RATED THERMAL POWER (QPPL).
2.9     Boron Concentration (TS 3.9.1) 2.9.1     The refueling boron concentration shall be > 2000 ppm.
SEQUOYAH-UNIT 2Pae9o17Rvsn1                                               Revision 1 Page 9 of 17
 
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 Table 1 COLR Methodology Topical Reports
: 1. BAW-1 0180-A, Revision 1, "NEMO-Nodal Expansion Method Optimized," March 1993.
(Methodology for TS 3.1.1-SHUTDOWN MARGIN, 3.1.3-Moderator Temperature Coefficient, 3.9.1-Boron Concentration)-
: 2. BAW-10169P-A, Revision 0, "RSG Plant Safety Analysis-B&W Safety Analysis Methodology for Recirculating Steam Generator Plants," October 1989.
(Methodology for TS 3.1 .3-Moderator Temperature Coefficient)
: 3. BAW-1 01 63P-A, Revision 0, "Core Operating Limit Methodology for Westinghouse-Designed PWRs," June 1989.
(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f1(AI), f2(AI) limits],
3.1.5-Shutdown Bank Insertion Limits, 3.1.6-Control Bank Insertion Limits, 3.2.1-Heat Flux Hot Channel Factor, 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.2.3-AXIAL FLUX DIFFERENCE)
: 4. EMF-2328(P)(A), "PWR Small Break LOCA Evaluation Model," March 2001.
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
: 5. BAW-1 0227P-A, Revision 1, "Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel,"' June 2003.
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
: 6. BAW-10186P-A, Revision 2, "Extended Burnup Evaluation," June 2003.
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
: 7. EMF-2103P-A, Revision 0, "Realistic Large Break LOCA Methodology for Pressurized Water Reactors," April 2003.
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
: 8. BAW-1 0241 P-A, Revision 1, "BHTP DNB Correlation Applied with LYNXT," July 2005.
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])
: 9. BAW-10199P-A, Revision 0, "The BWU Critical Heat Flux Correlations," August 1996.
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])
: 10. BAW-10189P-A, "CHF Testing and Analysis of the Mark-BW Fuel Assembly Design,"
January 1996.
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(Al) limits])
: 11. BAW-1 01 59P-A, "BWCMV Correlation of Critical Heat Flux in Mixing Vane Grid Fuel Assemblies," August 1990.
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])
: 12. BAW-10231 P-A, Revision .1, "COPERNIC Fuel Rod Design Computer Code," January 2004.
(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f2(Al) limits])
SEQUOYAH-UNIT 2                   Pg Page 100oof 17 7Rvso                  Revision 1
 
CQLR FOR SEQUOYAH UNIT 2 CYCLE 20 Table 2a Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation Advanced W17 HTP TM Fuel (TS 3.2.2)
AXIAL(X,Y)     ELEVATION (ft) MAP(X,Y,Z)      AXIAL(X,Y)    ELEVATION (ft) MAP(X,Y,Z) 1         1.8128                             1          2.5969 2         1.8125                             2          2.5380 3         1.8122                             3          2.4827 4         1.8119                             4          2.4411 5         1.8115                             5          2.4315 1.1             6         1.8109           1.4              6          2.4800 7         1.8106                             7          2.5356 8         1.8104                             8          2.4447 9         1.8098                             9          2.3555 10         1.8092                            10          2.1738
______11                  1.7599                           11          2.0238 1         2.0671                             1          2.6723 2         2.0664                             2          2.6061 3         2.0656                             3          2.5417 4          2.0649                           4          2.4913 5         2.0642                             5          2.4801 1.2             6         2.0636           1.5              6          2.5380 7         2.0624                             7          2.6273 8         2.0615                             8          2.5311 9         2.0457                             9          2.4447 10         1.9492                            10          2.2772
_____11                    1.8589                           11          2.0975 1         2.3433                             1          2.7308 2          2.3419                           2          2.6605 3          2.3412                           3.          2.5947 4         2.3397                           4          2.5371 5         2.3389                           5          2.5234 1.3               6         2.3381           1.6            6          2.5906
                    -7         2.3357                           7          2.7077 8         2.3130                             8          2.6117 9         2.1886                             9          2.5240 10         2.0643                            10          2.3758
______11                    1.9439           __  __ _11                  2.1662 SEQUOYAH-UNIT 2Pae1of7eisnI Page 11 of 17                            Revision 1
 
YCed 20 CO    ablFO2OaH UcnIti2n Table 2a (continued)
AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z)       AXlAL(X,Y)      ELEVATION (ft) MAP(X,Y,Z) 1          ,2.7664                              1          2.4339 2            2.7083                              2          2.4060 3            2.6380                              3          2.3856 4            2.5791                              4          2.3423 5            2.5639                              5          2.3114 1.7            6            2.6359,          >1.9              6          2.6006 7            2.7795                              7          2.5003 8            2.6870                              8         2.4004 9           2.5798                              9          2.2989 10            2.4726                              10         2.1483 11           2.2304            _____11                      1.9630 1            2.7963                              1         2.5057 2            2.7466                              2          2.4754 3            2.6775                              3         2.4449 4            2.6172                              4         2.3591 5            2.6010                              5         2.4205 1.8            6           2.6802            2.1                6         2.7643 7            2.8456                              7         2.6474 8            2.7552                              8         2.5360 9            2.6648                              9         2.4400 10           2.5655                              10          2.3277 11           2.2931            _____11                      2.0549 1           2.8235                              1         2.5380 2            2.7739                              2           2.5216 3           2.7125                              3          2.4619 4            2.6523                              4           2.4294 5            2.6328                              5           2.4290 1.9            6           2.7200            2.3                6          2.8222 7            2.9065                              7          2.7334 8            2.8193                              8          2.6234 9            2.7288                              9           2.5186 10           2.6384                              10          2.4215
_____11                    2.3482            _____11                      2.1250 SEQUOYAH-UNIT 2Pae1of7                                                Revision 1 Page 12 of 17
 
2 2OaH UcnIti2nCYLEd TableFO Table 2a (continued)
AXIAL(X,Y)  ELEVATION (ft) MAP(X,Y,Z)        AXIAL(X,Y)   ELEVATION (ft) MAP(X,Y,Z) 1         2.6440                            1          2.2448 2         2.5160                            2           2.5535
              '  3          2.5045                            3          2.4678 4          2.4488                            4          2.3229 5          2.5803                            5          2.8913 2.5.           6          2.9481              3.1            6          3.1515 7          2.8544                            7          3.0181 8          2.7286                            8          2.9699 9          2.6450                            9          2.8941 10          2.5527                            10          2.7819
_____11                  2.1731                            11          2.1866 1         2.5554                            1          2.0228 2          2.5529                            2           2.5172 3          2.5197                            3           2.4007 4          2.4375                            4          2.2195 5          2.5643                            5          3.0496 2.7            6          2.9839              3.3            6          3.2226 7          2.8837                            7          3.1446 8          2.7939                            8          3.0350 9          2.7040                            9          2.9688 10        .2.5997                            10          2.8533 11          2.1995                            11          2.1473 1          2.4223                            1.         1.7563 2          2.5653                            2           2.4566 3         2.5075                            3          2.3062 4          2.3955                            4          2.0854 5          2.7295                            5          3.2045 2.9           6          3.0921              3.5            6          3.2929 7          3.0070                            7          3.2627 8          2.8896                            8          3.0846 9          2.8058                            9         .3.0299 10          2.6974                            10.          2.9117
_____11                  2.2039              _____11                  2.0862 SEQUOYAH-UNIT 2                Pg Page 133f7Rvso of 17                      Revision 1
 
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 Table 2b Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation Mark-BW Fuel (TS 3.2.2)
AXIAL(X,Y)      ELEVATION (ft) MAP(X,Y,Z)      AXIAL(X,Y) ELEVATION (ft)  MAP(X,Y,Z) 2        1.9343                          2            2.8143 4         1.9300                          4            2.9856 1.1                6        1.9234            1.9          6           3.0073 8        1.9115                          8           2.8509 10        1.8894                        10           2.7048 2         2.1663                          2           2.4405 4        2.1558                          4           2.4405 1.2                6        2.1410            >1.9          6           2.7376 8        2.1153                          8           2.5906
                      '10        2,0582                        10           2.3456 2        *2.4023                          2           2.5881 4        2.3825                          4           2.5881 1.3               6        2.3599            2.2          6           2.9899 8         2.3100                          8            2.7800
_______10                    2.1760                        10            2.5367 2         2.6453                          2            2.6111 4        2.6136                          4           2.6111 1.4                6         2.5610            2.6          6            3.2947 8        2.4199                          8            3.2055 10        2.2787                        10            2.8049 2         2.7189                          2            2.9142 4        2.8181                          4           2.9142 1.5                6         2.6735                36                    4.0216 8         2.5280                          8            3.6527 10        2.3749                        10            3.1711 2         2.7720                          2           2.9618 4        2.9219                          4           2.9618 1.7                6         2.8641            3.5          6            4.2351 8        2.7064                          8           3.7452 10         2.5539                         10            3.3214 SEQUOYAH-UNIT 2                  Pg 144oof 17 Page        7Rvso                Revision 1
 
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 r-                  /~-          BA K C/
* 140
        &          (u1208 w100                                                                              _______
        -*                                                                        BANK 0D Z80 40                              /
20, 0 {.09,o)            ________          ________            _______          _______
0                0.2               0.A              0.6             0_8 (Fully Inserted)
Fraction of RATED THERMAL POWER FIGURE 1 Rod Bank Insertion Limits Versus THERMAL POWER, Four Loop Operation (TS 3.1.6)
* Fully withdrawn region shall be the condition where shutdown and control banks are at a position within the interval of >225 and <231 steps withdrawn, inclusive.
Fully withdrawn shall be the position as defined below, Cycle Burnup (MWd/mtU)                               Steps Withdrawn
                    &#x17d;0                                            &#x17d; 225 to -231 This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.
If the LEEM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the rod insertion limit lines must be increased by 3 steps withdrawn until the LEFM is returned to operation.
If the LEEM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the rod insertion limit lines must be increased by 3 steps withdrawn until the LEFM is returned to operation.
SEQUOYAH-UNIT 2 Pg 5o 7Rvso Page 15 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 1.2 1.0 0.8 0.6 0.4 0.2 0.0 I 2 2 I I 2 I I-2 I I I I I I 2 I 4-----2 2 2 2 I 2 2 I 2 2 Elevation K(z)(ft)0.000 1.0000 6.285 1.0000 -~----------
SEQUOYAH-UNIT 2                             Pg Page 155oof 17 7Rvso                      Revision 1
2 7.995 1.0000 2 2 2 2 9.705 1.0000 2 2 2 12.000 1.0000 2 2-2 2 I 2 2 2 2 2 2 2 2 I. 2 2 2 2 I I 2 I I I I 0 2 4 6 Core Height (Feet)10 12 FIGURE 2 K(Z) -Normalized FQ(X,Y,Z) as a Function of Core Height (TS 3.2.1 )SEQUOYAH-UNIT 2 Pg 6o 7Rvso Page 16 of 17 Revision 1 COLR FOR SEQUOYAH UNIT 2 CYCLE 20 I-1-S1*6='U 120 110 100 90 80 70 60 50 40 30 20 10 0 I I II---K- ---L U accept be_/--tperatD-7 -n---I----/ .--&deg;PecirainI
 
* -- I--/ t- --- I (-4b,5o) I I I II I I-- -V- -- -K-I [-.II i I _-- -- i28,o -I 2-----1--K* l--I-I I.v-50 30 10 0 10 Flux Difference (hl) %20 30 40 50 FIGURE 3 AXIAL FLUX DIFFERENCE Limits As A Function of RATED THERMAL. POWER.For Burnup Range 0 EFPD to EOL (TS 3.2.3)This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in oPeration.
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 1.2 I             2           2   I I             2           I   I
If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable  
                            -       2 1.0                                          I           I   I I             I           I 2         I 0.8          4-----2 2             2         2 I               2         2   I 2         2 0.6 Elevation     K(z)
*power level must be reduced by 1.3% in power, and the AFD limit lines must be made more restrictive by 1% in AFO until the LEFM is returned to operation.
(ft) 0.000       1.0000 0.4 6.285       1.0000   -~----------
SEQUOYAH-UNIT 2 Pg 7o 7Rvso Page 17 of 17 Revision 1}}
2       7.995       1.0000     2         2   2 2       9.705       1.0000     2         2   2 12.000       1.0000               2   2 0.2            -             2             2         I 2             2         2   2 2             2         2   2 I.             2         2   2 2               I             I         2   I I         I   I 0.0 0        2                 4             6             10          12 Core Height (Feet)
FIGURE 2 K(Z) - Normalized FQ(X,Y,Z) as a Function of Core Height (TS 3.2.1 )
SEQUOYAH-UNIT 2                       Page 166oof 17 Pg             7Rvso         Revision 1
 
COLR FOR SEQUOYAH UNIT 2 CYCLE 20 120 110 100
                          --- K-I I       II
                                                - - - L I --
II
                                                                            -V---
I I
K-I
[-.
Uaccept be_/
90          - -tperatD-     7     -n-I-
80      -   -I----/.         --   &deg;PecirainI           II          i  I _
70
                                                                      --      --    i28,o      -
60      * -- I--/t- ---               I 1-S1 50
              *6=
                'U
(-4b,5o) I         I 40 30              I2 20
                                                        ---             1--K 10
* l--
I           -I 0v                                          I.
                        -50       -40    -30   -20    -10     0     10       20    30  40    50 Flux Difference (hl) %
FIGURE 3 AXIAL FLUX DIFFERENCE Limits As A Function of RATED THERMAL. POWER
                                          .For Burnup Range 0 EFPD to EOL (TS 3.2.3)
This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in oPeration.
If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable *power level must be reduced by 1.3% in power, and the AFD limit lines must be made more restrictive by 1% in AFO until the LEFM is returned to operation.
SEQUOYAH-UNIT 2                               Pg Page 17 7oof 17 7Rvso                    Revision 1}}

Latest revision as of 08:24, 5 February 2020

Cycle 21 and Unit 2 Cycle 20 Core Operating Limits Reports, Revision No. 1
ML15328A052
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/16/2015
From: John Carlin
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML15328A052 (38)


Text

Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee 37384-2000 November 16, 2015 10 CFR 50.4 ATTN: Document Controi Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328

Subject:

Sequoyah Unit I Cycle 21, and Unit 2 Cycle 20 Core Operating Limits Reports, Revision No. 1

References:

1. Letter from NRC to TVA, "Sequoyah Nuclear Plant, Units 1 and 2

- Issuance of Amendments for the Conversion to the Improved Technical Specifications with Beyond Scope Issues (TAC Nos.

MF3128 and MF3129)," dated September 30, 20015 (ML15238B460)

In accordance with Sequoyah Nuclear Plant (SQN) Units 1 and 2 Technical Specifications (TSs) 5.6.3.d, enclosed is the Unit 1 Cycle 21 Core Operating Limits Report (COLR), Revision 1, and Unit 2 Cycle 20OCOLR, Revision 1. In accordance with TSs 5.6.3.d, the COLRs are required to be provided to the Nuclear Regulatory Commission (NRC) within 30 days of issuance for each reload cycle. Sequoyah Units 1 and 2 were issued license amendment Nos. 334 and 327, respectively for improved standard TSs (Reference 1). These license amendments resulted in the revisions to each of the COLRs as discussed in Enclosure 1. The revised COLRs became effective on October 21, 2016.

There are no new regulatory commitments in this letter. If you have any questions, please contact Jonathan Johnson, SQN Site Licensing Manager at (423) 843-8129.

Soso

U.S. Nuclear Regulatory Commission Page 2 November 16, 2015 Sequoyah Nuclear Plant Enclosures

1. Units 1 and 2 Core Operating Limits Report Changes
2. Sequoyah Unit I Cycle 21 Core Operating Limits Report, Revision 1
3. Sequoyah Unit 2 Cycle 20 Core Operating Limits Report, Revision 1 ZTK: DVG Enclosures cc (Enclosures):

NRC Regional Administrator - Region II NRC Senior Resident Inspector - SQN

ENCLOSURE1I SEQUOYAH UNITS 1 AND 2 CORE OPERATING LIMITS REPORT CHANGES The following describes the changes made to each Units' Core Operating Limits Report (COLR), as result of the NRC review and approval of License Amendment Request for the conversion of the Sequoyah Technical Specification (TS) to Improved Standard Technical Specification, NUREG-1 431, Revision 4.

1. Acronyms for All Rods Out (ARO) and Hot Zero THERMAL POWER (HZP) were removed from the COLRs.
2. In Section 1.0, a table was added to assist user of the COLRs.
3. Section 2.0 was updated to align the new TSs Reporting Requirements Section, 5.6.3, "Core Operating Limits Report".
4. In Section 2.1 the Cycle-Specific Parameter Limits were relocated from the TSs to the COLRs. These parameters involve the Shutdown Margin requirements with references to the associated Limiting Condition for Operation (LCO).
5. 60 ppm Moderator Temperature Coefficient limits were added in "Section 2.2 consistent with the NOTE in TSs LCO 3.1.3, "Moderator Temperature Coefficient," Surveillance Requirement 3.1.3.2.
6. Control Bank Insertion Limits requirement were added in Section 2.4 as necessary for TSs LCO 3.1.6, "Control Bank Insertion Limits," Surveillance Requirements.
7. Section 2.5 was revised to add information relocated from previous TSs for consistency with approved TSs LCO 3.2.1, "Heat Flux Hot Channel Factor (Fq(X, Y, Z))".
8. Section 2.6 was revised to add information relocated from previous TSs for consistency with approved TSs LCO 3.2.2, 'Nuclear Enthalpy Rise Hot Channel Factor F&H(X, Y)".
9. Power Distribution Limits coefficient definitions, such as BQNOM and BHDES, were eliminated as these are defined in the TS Bases.
10. The boron concentration limit for TSs LCO 3.9.1, 'Boron Concentration," were added to the COLRs consistent with the approved TVA License Amendment Request.

ENCLOSURE 2 SEQUOYAH UNIT 1 CYCLE 21 CORE OPERATING LIMITS REPORT REVISION 1

QA Record QARcordL36 151009 802 SEQUOYAH UNIT 1 CYCLE 21 CORE OPERATING LIMITS REPORT REVISION 1 October 2015 Prepared by:

Christine A. Setter, PWR Fuel Engineering Date Verified by:

John E. Strange, P R Fuel Engineering Reviewed by:

Date Kathl&*i',A unningham, PW Fuengneig ManagerL Date radnS. Catalanotto, Reactor Engineering Manager Approved by:

/ '&,/S Date Revision Pages affected All Reason for Revision: *Update for Improved Technical Specifications ('ITS) Implementation SEQUOYAH-UNIT 1Pae1o16Rvsn1 Page 1 of 16 Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 1.0 CORE OPERATING LIMITS REPORT This CORE OPERATING LIMITS REPORT (COLR) for Sequoyah Unit I Cycle 21 has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.3.

The TSs affected by this Report are listed below:

TS COLR COLR Section Technical Specification COLR Parameter Section Page 3.1.1 SHUTDOWN MARGIN (SDM) SDM 2.1 3 BOL MTC Limit 2.2.1 4 3.3 Moderator Temperature EOL MTC Limit "2.2.2 4 313 Coefficient (MTC) 300 ppm Surveillance Limit 2.2.3 4

________________60 ppm Surveillance Limit 2.2.4 4 3.1.4 Rod Group Alignment Limits SDM 2.1.3 3 Shutdown Bank Insertion Limits 2.3 4 3.1.5 Shutdown Bank Insertion LimitsSD2.4 3 CotoS BnDnsrinMiit 2.14 5 3.1.6rConrolnBanknnsertion imitstSD 2.1. 3 3.1.8 PHYSICS TESTS Exceptions- SDM 2.1.6 3 MODE 2 -___________ __

FQ 2.5.1 6 K(Z) 2.5.2 6 NSLOPEAFD 2.5.3 6 321 Heat Flux Hot Channel Factor PSLOPEAFD 2.5.4 6 321 (F0 (X,Y,Z)) NSLOPEf 2 (Al) 2.5.5 6 PSLOPEf 2 (AI) 2.5.6 6 FQ(X,YZ) Appropriate Factor 2.5.7 6 ITS LCO 3.2.1 Required Action A.3 2.5.8 6 MAP(X,Y,Z) 2.6.1 6 RRH 2.6.2 6 Nuclear Enthalpy Rise Hot TRH2.3 6 3.2.2263 Channel Factor (FAH(XY)) FAH(X,Y) Appropriate Factor 6 2.6.4 7 ITS 3.2.2 Required Action A.4 2.6.5 7 ITS 3.2.2 Required Action B.1 2.6.6 7 3.2.3 AXIAL FLUX DIFFERENCE AFD Limits 2.7 7 (AFD)___

3.3.1 Reactor Trip System (RTS) QTNL, QTPL, QTNS, and QTPS 2.8.1 8 Instrumentation QPNL, QPPL, QPNS, and QPPS 2.8.2 9 3.9.1 Boron Concentration Refueling Boron Concentration 2.9 9 5.6.3 CORE REOT(OR OPERATING LIMITS Aayia ehd nltclMtos2.0 3 SEQUOYAH-UNIT 1Pae2o16Rvsn1Page 2 of 16 Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.0 .OPERATING LIMITS The cycle-specific parameter limits for the TS listed in section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in TS 5.6.3. The versions of the topical reports which describe the methodologies used for this cycle are listed in Table 1.

The following abbreviations are used in this section:

BOL stands for Beginning of Cycle Life EOL stands for End of Cycle Life RTP stands for RATED THERMAL POWER 2.1 SHUTDOWN MARGIN - SDM (TS 3.1 .1, 3.1.4, 3.1.5, 3.1.6, 3.1.8) 2.1.1 For TS 3.1.1, SDM shall be ->1.6%Ak/k in MODE 2 with keff < 1.0, MODE 3 and MODE 4

  • 2.1.2 For TS 3.1.1, SDM shall be > 1.0 %Ak/k in MODE 5.

2.1.3 For TS 3.1.4, SDM shall be > 1.6 %Ak/k in MODE 1 and MODE 2.

2.1.4 For TS 3.1.5, SDM shall be >-1.6 %Ak/k in MODE 1 and MODE 2.

2.1.5 For TS 3.1.6, SDM shall be --.1.6 %Alk/

in MODE 1 and MODE 2 with keff> 1.0.

2.1.6 For TS 3.1.8, SDM shall be _>1.6 %Ak/k in MODE 2.

SEQUOYAH-UNIT 1 ae3o Page 6Rvso 3 of 16 Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.2 Moderator Temperature Coefficient - MTC (TS 3.1.3) 2.2.1 The BOL MTC limit is: ,*

less positive than -0.05 x10-5 Ak/k/ 0 F.

2.2.2 The EOL MTC limit is:

less negative than or equal to -4.50 x 10.4 Ak/k/°F.

2.2.3 The 300 ppm Surveillance limit is:

less negative than or equal to -3.74 x 10-4 Ak/k/°F.

2.2.4 The 60 ppm Surveillance limit is:

less negative than or equal to -4.15 xl10 Ak/k/0 F.

2.3 Shutdown Bank Insertion Limits (TS 3.1.5) 2.3.1 Each shutdown bank shall be withdrawn to a position as defined below:

SEQUOYAH-UNIT 1 ae4o page 6Rvso 4 of 16 Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.4 Control Bank Insertion Limits (TS 3.1.6) 2.4.1 The control banks shall be limited in physical insertion as shown in Figure 1.

2.4.2 Each cOntrol bank shall be considered fully withdrawn from the core at>__225 steps.

2.4.3 The control banks shall be operated in sequence by withdrawal of Bank A, Bank B, Bank C, and Bank D. The control banks shall be sequenced in reverse order upon insertion.

2.4.4 Each control bank not fully withdrawn from the core shall be operated with the following overlap as a function of full out position.

Full Out Position (steps) Bank Overlap (steps) Bank Difference (steps) 225 97 128 226 98 128 227 99 128 228 100 128 229 101 128 230 102 128 231 103 128 SEQUOYAH-UNIT 1 ae 5 off16Rvso Page 16 Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.5 Heat Flux Hot Channel Factor - FQ(X,Y,Z) (TS 3.2.1) 2.5.1 FQRT- 2.62 2.5.2 K(Z) is provided in Figure 2 2.5.3 NSLOPEAFD = 1.21 2.5.4 PSLOPEAFD = 1.55 2.5.5 NSLOPEf2 (AI) = 1.48 2.5.6 PSLOPEf 2(AI) = 2.00 2.5.7 The appropriate factor for increase in FQM(X,Y,Z) for compliance with SR 3.2.1.2 and SR 3.2.1.3 is specified as follows:

For all cycle burn ups, use 2.0%

2.5.8 ITS LCO 3.2.1 Required Action A.3 reduces the Overpower Delta T Trip setpoints (value of K< 4) at least 1% (in AT span) for each 1% that FQC(x,Y,Z) exceeds its limit.

2.6 Nuclear Enthalpy Rise Hot Channel Factor - FAH(X,Y) (TS 3.2.2) 2.6.1 MAP(X,Y,Z) is provided in Table 2.

2.6.2 RRH=3.34 when 0.8 <P<*1.0 RRH=1.67 whenP<0.8 P = THERMAL POWER / RATED THERMAL POWER RRH = Thermal power reduction required to compensate for each 1% that FAH(X,Y) exceeds its limit.

2.6.3 TRH = 0.0334 when 0.8 < P < 1.0 TRH = 0.0167 when P < 0.8 P = THERMAL POWER / RATED THERMAL POWER TRH = Reduction in Overtemperature Delta T K1 setpoint required to compensate for each 1% that FAH(X,Y) exceeds its limit.

SEQUOYAH-UNIT 1Pae6o16RvsnIPage 6 of 16 Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.6.4 The appropriate factor for increase in FAHM (X,Y) for compliance with-SR 3.2.2.1 and SR 3.2.2.2 is specified as follows:

For all cycle burnups, use 2.0%

2.6.5 ITS 3.2.2 Required Action A.4 reduces the Overtemperature Delta T setpoint (K1 term in Table 3.3.1-1) by > TRH multiplied by the FAH min margin.

  • 2.6.6 ITS 3.2.2 Required Action B.1 reduces the Overtemperature Delta T setpoint (K1 term in Table 3.3.1-1) by >-TRH multiplied by the f1(Al) min margin.

2.7 AXIAL FLUX DIFFERENCE - AFD (TS 3.2.3) 2.7.1 The AFD limits are specified in Figure 3 SEQUOYAH-UNIT 1Pae7o16RvsnIPage 7 of 16 Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.8 Reactor Trip System Instrumentation (TS *3.3.1) 2.8.1 Trip Reset Term [f1(Al)] for Overtemperature Delta-T Trip

  • The following parameters are required to specify the power level-dependent f1(AI) trip reset term limits for Table 3.3.1-1 (function 6), Overtemperature Delta-T trip function:

2.8.1.1 QTNL = -20%

where QTNL = the maximum negative Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.

2.8.1.2 QTPL = +5%

where QTPL = the maximum positive Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.

2.8.1.3 QTNS = 2.50%

where QTNS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QTNL).

2.8.1.4 QTPS = 1.40%

where QTPS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its positive limit at RATED THERMAL POWER (QTPL).

SEQUOYAH-UNIT 1 ae8o Page 8 of 166Rvso Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.8.2 Trip Reset Term [f2 (AI)] for Overpower Delta-T Trip The following parameters are required to specify the power level-dependent f2(AI) trip reset term limits for Table 3.3.1-1 (function 7),

Overpower Delta-T trip function:

  • 2.8.2.1 QPNL = -25%

where QPNL = the maximum negative Al setpoint at RATED THERMAL *POWER at which the trip setpoint is not reduced by the axial power distribution.

2.8.2.2 QPPL = +25%

where QPPL = the maximum positive Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.

2.8.2.3 QPNS = 1.70%

where QPNS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QPNL).

2.8.2.4 QPPS = 1.70%

where QPPS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al

> exceeds its positive limit at RATED.THERMAL POWER (QPPL).

2.9 Boron Concentration (TS 3.9.1) 2.9.1 The refueling boron concentration shall be z 2080 ppm.

SEQUOYAH-UNIT 1 ae9o Page 9 of 166Rvso Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 Table 1 COLR Methodology Topical Reports

1. BAW-10180-A, Revision 1, "NEMO-Nodal Expansion Method Optimized," March 1993.

(Methodology for TS 3.1 .1-SHUTDOWN MARGIN, 3.1 .3-Moderator Temperature Coefficient, 3.9.1-Boron Concentration)

2. BAW-10169P-A, Revision 0, "RSG Plant Safety Analysis-B&W Safety Analysis Methodology for Recirculating Steam Generator Plants," October 1989.

(Methodology for TS 3.1 .3-Moderator Temperature Coefficient)

3. BAW-10163P-A, Revision 0, ."Core Operating Limit Methodology for Westinghouse-Designed PWRs," June 1989.

(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f1 (AI), f2(AI) limits],

3.1.5-Shutdown Bank Insertion Limits, 3.1.6-Control Bank Insertion Limits, 3.2.1-Heat F~lux Hot Channel Factor, 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.2.3-AXIAL FLUX DIFFERENCE)

4. EMF-2328(P)(A), "PWR Small Break LOCA Evaluation Model,"' March 2001.

(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)

5. BAW-10227P-A, Revision 1, "Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel," June 2003.

(Methodology for TS 3.2.1-Hleat Flux Hot Channel Factor)

6. BAW-10186P-A, Revision 2, "Extended Burnup Evaluation," June 2003.

(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)

7. EMF-2103P-A, Revision 0, "Realistic Large Break LOCA Methodology for Pressurized Water Reactors,". April 2003.

(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)

8. BAW-1 0241 P-A, Revision 1, "BHTP DNB Correlation Applied with LYNXT," July 2005.

(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])

9. BAW-10199P-A, Revision 0, "The BWU Critical Heat Flux Correlations," August 1996.

(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])

10. BAW-10189P-A, "CHF Testing and Analysis of the Mark-BW Fuel Assembly Design,"

January 1996.

(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])

1 1. BAW-10159P-A, "BWCMV Correlation of Critical Heat Fluxin Mixing Vane Grid Fuel Assemblies," August .1990.

(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])

12. BAW-10231P-A, Revision 1, "COPERNIC Fuel Rod Design Computer Code," January 2004.

(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f2 (AI) limits])-

SEQUOYAH-UNIT 1 ae110 off16Rvso Page 16 Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 Table 2 Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation (TS 3.2.2)

AXlAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) 1 1.8128 1 2.5969 2 1.8125 2 2.5380 3 1.8122. 3 2.4827 4 1.8119 4 2.4411 5 1.8115 5 2.4315 1.1 6 1.8109 1.4 6 2.4800 7 1.8106 7 2.5356 8 1.8104 8 2.4447 9 1.8098 9 2.3555 10 1.8092 10 2.1738 11 1.7599 11 2.0238 1 2.0671 1 2.6723 2 2.0664 2 2.6061 3 2.0656 3 2.5417 4 2.0649 4 2.4913 5 2.0642 5 2.4801 1.2 6 2.0636 1.5 6 2.5380 7 2.0624 7 2.6273 8 2.0615 8 2.5311 9 2.0457 9 2.4447 10 1.9492 10 2.2772 11 - 1.8589 11 2.0975 1 2.3433 1 2.7308 2 2.3419 2 2.6605 3 2.3412 3 2.5947 4 2.3397 4 2.5371 5 2.3389 5 2.5234 1.3 6 2.3381 1.6 6 2.5906 7 2.3357 7 2.7077 8 2.3130 8 2.6117 9 2.1886 9 2.5240 10 2.0643 10 2.3758

______11 1.9439 11 2.1662 SEQUOYAH-UNIT 1 ae111 off16Rvso Page 16 Revision 1

Uont in CYCEd2 2EUA TableFO Table 2 (continued)

AXIAL(X,Y) ELEVATION(ft) MAP(X,Y,Z) AXIAL(X,Y) ELEVATION (if) MAP(X,Y,Z) 1 2.7664 1 2.4339 2 2.7083 2 2.4060 3 2.6380 3 2.3856 4 2.5791 4 2.3423 5 2.5639 5 2.3114 1.7 6 2.6359 >1.9 6 2.6006 7 2.7795 7 2.5003 8 2.6870 8 2.4004 9 " 2.5798 9 2.2989 10 2.4726 10 2.1483 11 2.2304 11 . 1.9630 1 2.7963 1 2.5057 2 2.7466 2 2.4754 3 2.6775 3 2.4449 4 2.6172 4 2.3591 5 2.6010 5 2.4205 1.8 6 2.6802 2.1 6 2.7643 7 2.8456 7 2.6474 8 2.7552 8 2.5360 9 2.6648 9 2.4400 10 2.5655 10 2.3277 11 2.2931 11 2.0549 1 2.8235 1 2.5380 2 2.7739 2 2.5216 3 2.7125 3 2.4619 4 2.6523 4 2.4294 5 2.6328 5 2.4290 1.9 6 2.7200 2.3 6 2.8222 7 2.9065 7 2.7334 8 2.8193 8 2.6234 9 2.7288 9 2.5186 10 2.6384 10 2.4215

______11 2.3482 _____11 2.1250 SEQUOYAH-UNIT I1ae1 Page 12 off16Rvso 16 Revision 1

2 2EUA UcnItinCYCEd TableFO Table 2 (continued)

AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) 1 2.6440 1 2.2448 2 2.5160 2 2.5535 3 2.5045 3 2.4678 4 2.4488 4 2.3229 5 2.5803 5 2.8913 2.5 6 2.9481 3.1 6 3.1515 7 2.8544 7 3.0181 8 2.7286 8 2.9699 9 2.6450 9 2.8941 10 2.5527 10 2.7819 11 2.1731 11 2.1866 1 2.5554 1 2.0228 2 2.5529 2 2.5172 3 2.5197 3 2.4007 4 2.4375 4 2.2195 5 2.5643 5 3.0496 2.7 6 2.9839 3.3 6 3.2226 7 2.8837 7 3.1446 8 2.7939 8 3.0350 9 2.7040 9 2.9688 10 2.5997 10 2.8533 11 2.1995 11 2.1473 1 2.4223 1 1.7563 2 2.5653 2 2.4566 3 2.5075 3 2.3062 4 2.3955 4 2.0854 5 2.7295 5 3.2045 2.9 6 3.0921 3.5 6 3.2929 7 3.0070 7 3.2627 8 2.8896 8 3.0846 9 2.8058 9 3.0299 10 2.6974

  • 10 2.9117

_____11 2.2039 _____11 2.0862 SEQUOYAH-UNIT 1 Pg 13 Page 3oof 16 6Rvso Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 231

{Fu]* %%%hdr'a*.* RegiGn)* (.575*225}

220 p Regior~

(FuI~y Withdn~wn - (575~225)

'Inn I 14160/'*B 0-

/ ABANK D Cl) 820 rm 0

400 20 __ _ _ _ _

40 0.2 0.4 0.6 0_8 I (Fully Inserted)

Fraction of RATED THERMAL POWER FIGURE 1 Rod Bank Insertion Limits Versus THERMAL POWER, Four Loop Operation (TS 3.1.6)

  • Fully withdrawn region shall be the condition where shutdown and control banks are at a position within the interval of Ž225 and <231 steps withdrawn, inclusive.

Fully withdrawn shall be the position as defined below Cycle Burnup (MWd/mtU) Steps Withdrawn

>0 ->225 to < 231 This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.

If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the rod insertion limit lines must be increased by 3 steps withdrawn until the LEFM is returned to operation.

SEQUOYAH-UNIT 1 ae114 off16Rvso Page 16 Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 1.2 1.0 Eeaio K Iz) 0.8

( )

0.00 1000 6,25 1000 0.6

\ I 0.4 I i

I Elvaio K!z 0.2 0.0 0 2 4 6- 8 10 12 Core Height (Feet)

FIGURE 2 K(Z) - Normalized FQ(X,Y,Z) as a Function of Core Height (TS 3.2.1)

SEQUOYAH-UNIT 1 Page 15 of 16 Revision 1 Rvso

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 120 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 I II I I 110 100 (710) UnaccieptableI_

90

- - hOpe rationI a.

0 80 0

0.

70 - _ -. I_

'I 60 I-a'U 50 II-0 40 30

]

I q L I

20 I I S I I1 10 I I 0 '  ! i '

-50 -40 -30 -20 -10 0 10 20 30 40 50 Flux Difference (Al) %

FIGURE 3 AXIAL FLUX DIFFERENCE Limits As A Function of RATED THERMAL POWER For Burnup Range 0 EFPD to EOL (TS 3.2.3)

This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.

If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the AFD limit lines must be made more restrictive by 1% in AFD until the LEFM is returned to operation.

SEQUOYAH-UNIT 1 Pg 166oof 16 Page 6Rvso Revision 1

ENCLOSURE 3 SEQUOYAH UNIT 2 CYCLE 20 CORE OPERATING LIMITS REPORT REVISION 1

QA Record QARcordL36 151009 803 SEQUOYAH UNIT 2 CYCLE 20 CORE OPERATING LIMITS REPORT REVISION I October 2015 Prepared by:

Christine A. Setter, PWR Fuel Engineering Date Verified by:

Jol*E.Strange., P,5R* Fuel Engineering / DatO!e Reviewed by:

K *he1A.Cnigam, PWR Fuel Engineering Manager Date Brandon S. Catalanotto, Reactor Engineering Manager Date/

/

Approved by:

PORC Chairman Date Plant Manager 'Date Revision .. _1 Pages affected All Reason for Revision: Update for Improved Technical Specifications (ITS) Implementation SEQUOYAH-UNJT 2Pae1o17Rvsn1 Page 1 of 17 Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 1.0 CORE OPERATING LIMITS REPORT This CORE OPERATING LIMITS REPORT (COLR) for Sequoyah Unit 2 Cycle 20 has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.3.

The TSs affected by this Report are listed below:

TS COLR COLR Section Technical Specification COLR Parameter Section Page 3.1.1 SHUTDOWN MARGIN (SDM) SDM 2.1 3 BOL MTC Limit 2.2.1 4 313 Moderator Temperature EOL MTC Limit 2.2.2 4 Coefficient (MTC) 300Oppm Surveillance Limit 2.2.3 4 60 ppm Surveillance Limit 2.2.4 4 3.1.4 Rod Group Alignment Limits SDM 2.1.3 3 Shutdown Bank Insertion Limits 2.3 4 3.1.5 Shutdown Bank Insertion LimitsSD214 3 CotoS anDnetinLmt 2..4 5 3.1.6rCntrolnBnkIInsetionnLiitsiSs 2.14 3 3.1.8 PHYSICS TESTS Exceptions - SDM 2.1.6 3 MODE 2 FTP 2.5.1 6 K(Z) 2.5.2 6 NSLOPEAFD 2.5.3 6 321 Heat Flux Hot ChanneiFactor PSLOPEAFD 2.5.4 6 (F0 (X,Y,Z)) NSLOPEf 2 (AI) 2.5.5 6 PSLOPEf 2 (AI) 2.5.6 6 FQ(X,Y,Z) Appropriate Factor 2.5.7 6

___________________ITS LCO 3.2.1 Required Action A.3 2.5.8 6 MAP(X,Y,Z) 2.6.1 6 RRH 2.6.2 6 322 Nuclear Enthalpy Rise Hot TRH 2.6.3 6 Channel Factor (FAH(X,Y)) FAH(X,Y) Appropriate Factor 2.6.4 7 ITS 3.2.2 Required Action A.4 2.6.5 7 ITS 3.2.2 Required Action B.1 2.6.6 7 323 AXIAL FLUX DIFFERENCE AOLmt .

(AFD) _ _ _ _ _ _ _ _ _ _ _

331 Reactor Trip System (RTS) QTNL, QTPL, QTNS, and QTPS 2.8.1 8 Instrumentation QPNL, QPPL, QPNS, and QPPS 2.8.2 9 3.9.1 Boron Concentration Refueling Boron Concentration 2.9 9 5.6.3 CORE REOT(OR OPERATING LlMITS Aayia nltclMtos2.0 ehd 3 SEQUOYAH-UNIT 2Pae2o17Risn1 Page 2 of 17 Revision 1

COLR FoR SEQUOYAH UNIT 2 CYCLE 20 2.0 OPERATING LIMITS The cycle-specific parameter limits for the TS listed in section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in TS 5.6.3. The versions of the topical reports which describe the methodologies used for this cycle are listed in Table 1.

The following abbreviations are used in this section:,

BOL stands for Beginning of Cycle Life EOL stands for End of Cycle Life RTP stands for RATED THERMAL POWER 2.1 SHUTDOWN MARGIN - SOM (TS 3.1.1, 3.1.4, 3.1.5, 3.1.6, 3.1.8) 2.1.1 For TS 3.1.1, SOM shall be >_1.6 %Ak/k in MODE 2 with keff < 1.0, MODE 3 and MODE 4 2.1.2 For TS 3.1.1, SDM shall be >_1.0 %Ak/k in MODE 5.

2.1.3 For TS 3.1.4, SDM shall be >1.6 %Ak/k in MODE 1 and MODE 2.

2.1.4 For TS 3.1.5, SDM shall be >_1.6 %Ak/k in MODE 1 and MODE 2.

2.1.5 For TS 3.1.6, SDM shall be >__1.6 %Ak/k in MODE 1 and MODE 2 with keff> 1.0.

2.1.6 For TS 3.1.8, SDM shall, be >_.1.6 %Ak/k in MODE 2.

SEQUOYAH-UNIT 2Pae3o17RvsnIPage 3 of 17 .Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.2 Moderator Temperature Coefficient - MTC (TS 3.1.3) 2.2.1 The BOL MTC limit is:

less positive than -0.16 x10-5 Ak/k/°F.

2.2.2 The EOL MTC limit is:

less negative than or equal to -4.50 x 10 A Ak/k/°F.

2.2.3 The 300 ppm Surveillance limit is:

less negative than or equal to -3.75 x 104 Ak/k/°F.

2.2.4 The 60 ppm Surveillance limit is:

less negative than or equal to -4.20 x10A Ak/k/°F.

2.3 Shutdown Bank Insertion Limits (TS 3.1.5) 2.3.1 Each shutdown bank shall be withdrawn to a position as defined below:

SEQUOYAH-UNIT 2Pae4o17RvsnI*Page 4 of 17 Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.4 Control Bank Insertion Limits (TS 3.1.6) 2.4.1 The control banks Shall be limited in physical insertion as shown in Figure 1.

2.4.2 Each control bank shall be considered fully withdrawn from the core at>__225 steps.

2.4.3 The control banks shall be operated in sequence by withdrawal of Bank A, Bank B, Bank C, and Bank 0. The control banks shall be sequenced in reverse order upon insertion.

2.4.4 Each control bank not fully withdrawn from the core shall be operated with the following overlap as a function of full out position.

Full Out Position Bank Overlap Bank Difference (ts) (steps) (steps) 225 9712 226 9812 227 99 128__________

228 100 128 229 101 128 230 102 128 231 103 "128 SEQUOYAH-UNIT 2Pae5o17RvsnIPage 5 of 17 Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.5 Heat Flux Hot Channel Factor- FQ(X,Y,Z) (TS 3.2.1)

RTP 2.5.1 FQ = 2.62 2.5.2 K(Z) is provided in Figure 2 2.5.3 NsLoPEAFD = 1.44 2.5.4 PSLOPEAFD = 1.76-2.5.5 NSLOPEf 2(/I) = 1.48 2.5.6 PSLOPEf 2(AI) = 2.98 M

2.5.7 The appropriate factor for increase in FQ (X,Y,Z) for compliance with SR 3.2.1.2 and SR 3.2.1.3 is specified as follows:

For cycle burnups: 0 to 3312 MWd/mtU, use 2.0%

For cycle burnups: > 3312 to 3864 MWd/mtU, use 2.12%

For cycle* burnups: > 386,4 MWd/mtU, use 2.0%

2.5.8 ITS LCO 3.2.1 Required Action A.3 reduces the Overpower Delta T Trip setpoints (value of K4 ) at least 1% (in AT span) for each 1% that FQC(X,Y,Z) exceeds its limit.

2.6 Nuclear Enthalpy Rise Hot Channel Factor - FAH(X,Y) (TS 3.2.2) 2.6.1 MAP(X,Y,Z) is provided in Tables 2a and 2b.

2.6.2 RRH = 3.34 when 0.8 < P_* 1.0 RRHIl.67 whenP<0.8 P = THERMAL POWER / RATED THERMAL POWER RRH = Thermal power reduction required to compensate for each

  • 1% that FAH(X,Y) exceeds its limit.

2.6.3 TRH = 0.0334 when 0.8 < P < 1.0 TRH = 0.01 67 when P < 0.8 P = THERMAL POWER I RATED THERMAL POWER TRH = Reduction in Overtemperature Delta T K1 setpoint required to compensate for each 1% that FAH(X,Y) exceeds its limit.

SEQUOYAH-UNIT 2 Pg Page 6 off117 Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.6.4 The appropriate factor for increase in FAHM (X,Y) for compliance with SR 3.2.2.1 and SR 3.2.2.2 is specified as follows:

For all cycle burnups, use 2.0%:

2.6.5 ITS 3.2.2 Required Action A.4 reduces the overtemperature Delta T setpoint (K1 term in Table 3.3.1-1) by > TRH multiplied by the FAN min margin.

2.6.6 ITS 3.2.2 Required Action 8.1 reduces the Overtemperature Delta T setpoint (K1 term in Table 3.3.1-1) by > TRH multiplied by the f1 (Al) min margin.

2.7 AXIAL FLUX DIFFERENCE - AFD (TS 3.2.3) 2.7.1 The AFD limits are specified in Figure 3 SEQUOYAH-UNIT 2Pae7o17RvsnI Page 7 of 17 Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.8 Reactor Trip System Instrumentation (TS 3.3.1) 2.8.1 Trip Reset Term [f1(AI)] for Overtemperature Delta-T Trip The following parameters are required to specify the power level-dependent f1(AI) trip reset term limits for Table 3.3.1-1 (function 6), Overtemperature Delta-T trip function:

2.8.1 .1 QTNL = -20%

where QTNL = the maximum negative Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.

2.8.1.2 QTPL = +5%

where QTPL = the maximum positive AlI setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.

2.8.1.3 QTNS = 2.50%

where QTNS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QTNL).

2.8.1.4 QTPS = 1.40%

where QTPS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its positive limit at RATED THERMAL POWER (QTPL).

SEQUOYAH-UNIT 2Pae8o17Rvsn1Page 8 of 17 Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.8.2 Trip Reset Term [fz(AI)] for Overpower Delta-T Trip The following parameters are required to specify the power level-dependent f2 (AI) trip reset term limits for Table 3.3.1-1 (function 7), Overpower Delta-T trip function:

.2.8.2.1 QPNL =-25%

Where QPNL = the maximum negative Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.

2.8.2.2 QPPL = +25%

where QPPL = the maximum positive Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.

2.8.2.3 QPNS = 1.70%

where QPNS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QPNL).

2.8.2.4 QPPS = 1.70%

where QPPS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al exceeds its positive limit at RATED THERMAL POWER (QPPL).

2.9 Boron Concentration (TS 3.9.1) 2.9.1 The refueling boron concentration shall be > 2000 ppm.

SEQUOYAH-UNIT 2Pae9o17Rvsn1 Revision 1 Page 9 of 17

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 Table 1 COLR Methodology Topical Reports

1. BAW-1 0180-A, Revision 1, "NEMO-Nodal Expansion Method Optimized," March 1993.

(Methodology for TS 3.1.1-SHUTDOWN MARGIN, 3.1.3-Moderator Temperature Coefficient, 3.9.1-Boron Concentration)-

2. BAW-10169P-A, Revision 0, "RSG Plant Safety Analysis-B&W Safety Analysis Methodology for Recirculating Steam Generator Plants," October 1989.

(Methodology for TS 3.1 .3-Moderator Temperature Coefficient)

3. BAW-1 01 63P-A, Revision 0, "Core Operating Limit Methodology for Westinghouse-Designed PWRs," June 1989.

(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f1(AI), f2(AI) limits],

3.1.5-Shutdown Bank Insertion Limits, 3.1.6-Control Bank Insertion Limits, 3.2.1-Heat Flux Hot Channel Factor, 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.2.3-AXIAL FLUX DIFFERENCE)

4. EMF-2328(P)(A), "PWR Small Break LOCA Evaluation Model," March 2001.

(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)

5. BAW-1 0227P-A, Revision 1, "Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel,"' June 2003.

(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)

6. BAW-10186P-A, Revision 2, "Extended Burnup Evaluation," June 2003.

(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)

7. EMF-2103P-A, Revision 0, "Realistic Large Break LOCA Methodology for Pressurized Water Reactors," April 2003.

(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)

8. BAW-1 0241 P-A, Revision 1, "BHTP DNB Correlation Applied with LYNXT," July 2005.

(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])

9. BAW-10199P-A, Revision 0, "The BWU Critical Heat Flux Correlations," August 1996.

(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])

10. BAW-10189P-A, "CHF Testing and Analysis of the Mark-BW Fuel Assembly Design,"

January 1996.

(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(Al) limits])

11. BAW-1 01 59P-A, "BWCMV Correlation of Critical Heat Flux in Mixing Vane Grid Fuel Assemblies," August 1990.

(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])

12. BAW-10231 P-A, Revision .1, "COPERNIC Fuel Rod Design Computer Code," January 2004.

(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f2(Al) limits])

SEQUOYAH-UNIT 2 Pg Page 100oof 17 7Rvso Revision 1

CQLR FOR SEQUOYAH UNIT 2 CYCLE 20 Table 2a Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation Advanced W17 HTP TM Fuel (TS 3.2.2)

AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) 1 1.8128 1 2.5969 2 1.8125 2 2.5380 3 1.8122 3 2.4827 4 1.8119 4 2.4411 5 1.8115 5 2.4315 1.1 6 1.8109 1.4 6 2.4800 7 1.8106 7 2.5356 8 1.8104 8 2.4447 9 1.8098 9 2.3555 10 1.8092 10 2.1738

______11 1.7599 11 2.0238 1 2.0671 1 2.6723 2 2.0664 2 2.6061 3 2.0656 3 2.5417 4 2.0649 4 2.4913 5 2.0642 5 2.4801 1.2 6 2.0636 1.5 6 2.5380 7 2.0624 7 2.6273 8 2.0615 8 2.5311 9 2.0457 9 2.4447 10 1.9492 10 2.2772

_____11 1.8589 11 2.0975 1 2.3433 1 2.7308 2 2.3419 2 2.6605 3 2.3412 3. 2.5947 4 2.3397 4 2.5371 5 2.3389 5 2.5234 1.3 6 2.3381 1.6 6 2.5906

-7 2.3357 7 2.7077 8 2.3130 8 2.6117 9 2.1886 9 2.5240 10 2.0643 10 2.3758

______11 1.9439 __ __ _11 2.1662 SEQUOYAH-UNIT 2Pae1of7eisnI Page 11 of 17 Revision 1

YCed 20 CO ablFO2OaH UcnIti2n Table 2a (continued)

AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) AXlAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) 1 ,2.7664 1 2.4339 2 2.7083 2 2.4060 3 2.6380 3 2.3856 4 2.5791 4 2.3423 5 2.5639 5 2.3114 1.7 6 2.6359, >1.9 6 2.6006 7 2.7795 7 2.5003 8 2.6870 8 2.4004 9 2.5798 9 2.2989 10 2.4726 10 2.1483 11 2.2304 _____11 1.9630 1 2.7963 1 2.5057 2 2.7466 2 2.4754 3 2.6775 3 2.4449 4 2.6172 4 2.3591 5 2.6010 5 2.4205 1.8 6 2.6802 2.1 6 2.7643 7 2.8456 7 2.6474 8 2.7552 8 2.5360 9 2.6648 9 2.4400 10 2.5655 10 2.3277 11 2.2931 _____11 2.0549 1 2.8235 1 2.5380 2 2.7739 2 2.5216 3 2.7125 3 2.4619 4 2.6523 4 2.4294 5 2.6328 5 2.4290 1.9 6 2.7200 2.3 6 2.8222 7 2.9065 7 2.7334 8 2.8193 8 2.6234 9 2.7288 9 2.5186 10 2.6384 10 2.4215

_____11 2.3482 _____11 2.1250 SEQUOYAH-UNIT 2Pae1of7 Revision 1 Page 12 of 17

2 2OaH UcnIti2nCYLEd TableFO Table 2a (continued)

AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) 1 2.6440 1 2.2448 2 2.5160 2 2.5535

' 3 2.5045 3 2.4678 4 2.4488 4 2.3229 5 2.5803 5 2.8913 2.5. 6 2.9481 3.1 6 3.1515 7 2.8544 7 3.0181 8 2.7286 8 2.9699 9 2.6450 9 2.8941 10 2.5527 10 2.7819

_____11 2.1731 11 2.1866 1 2.5554 1 2.0228 2 2.5529 2 2.5172 3 2.5197 3 2.4007 4 2.4375 4 2.2195 5 2.5643 5 3.0496 2.7 6 2.9839 3.3 6 3.2226 7 2.8837 7 3.1446 8 2.7939 8 3.0350 9 2.7040 9 2.9688 10 .2.5997 10 2.8533 11 2.1995 11 2.1473 1 2.4223 1. 1.7563 2 2.5653 2 2.4566 3 2.5075 3 2.3062 4 2.3955 4 2.0854 5 2.7295 5 3.2045 2.9 6 3.0921 3.5 6 3.2929 7 3.0070 7 3.2627 8 2.8896 8 3.0846 9 2.8058 9 .3.0299 10 2.6974 10. 2.9117

_____11 2.2039 _____11 2.0862 SEQUOYAH-UNIT 2 Pg Page 133f7Rvso of 17 Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 Table 2b Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation Mark-BW Fuel (TS 3.2.2)

AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) 2 1.9343 2 2.8143 4 1.9300 4 2.9856 1.1 6 1.9234 1.9 6 3.0073 8 1.9115 8 2.8509 10 1.8894 10 2.7048 2 2.1663 2 2.4405 4 2.1558 4 2.4405 1.2 6 2.1410 >1.9 6 2.7376 8 2.1153 8 2.5906

'10 2,0582 10 2.3456 2 *2.4023 2 2.5881 4 2.3825 4 2.5881 1.3 6 2.3599 2.2 6 2.9899 8 2.3100 8 2.7800

_______10 2.1760 10 2.5367 2 2.6453 2 2.6111 4 2.6136 4 2.6111 1.4 6 2.5610 2.6 6 3.2947 8 2.4199 8 3.2055 10 2.2787 10 2.8049 2 2.7189 2 2.9142 4 2.8181 4 2.9142 1.5 6 2.6735 36 4.0216 8 2.5280 8 3.6527 10 2.3749 10 3.1711 2 2.7720 2 2.9618 4 2.9219 4 2.9618 1.7 6 2.8641 3.5 6 4.2351 8 2.7064 8 3.7452 10 2.5539 10 3.3214 SEQUOYAH-UNIT 2 Pg 144oof 17 Page 7Rvso Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 r- /~- BA K C/

  • 140

& (u1208 w100 _______

-* BANK 0D Z80 40 /

20, 0 {.09,o) ________ ________ _______ _______

0 0.2 0.A 0.6 0_8 (Fully Inserted)

Fraction of RATED THERMAL POWER FIGURE 1 Rod Bank Insertion Limits Versus THERMAL POWER, Four Loop Operation (TS 3.1.6)

  • Fully withdrawn region shall be the condition where shutdown and control banks are at a position within the interval of >225 and <231 steps withdrawn, inclusive.

Fully withdrawn shall be the position as defined below, Cycle Burnup (MWd/mtU) Steps Withdrawn

Ž0 Ž 225 to -231 This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.

If the LEEM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the rod insertion limit lines must be increased by 3 steps withdrawn until the LEFM is returned to operation.

SEQUOYAH-UNIT 2 Pg Page 155oof 17 7Rvso Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 1.2 I 2 2 I I 2 I I

- 2 1.0 I I I I I I 2 I 0.8 4-----2 2 2 2 I 2 2 I 2 2 0.6 Elevation K(z)

(ft) 0.000 1.0000 0.4 6.285 1.0000 -~----------

2 7.995 1.0000 2 2 2 2 9.705 1.0000 2 2 2 12.000 1.0000 2 2 0.2 - 2 2 I 2 2 2 2 2 2 2 2 I. 2 2 2 2 I I 2 I I I I 0.0 0 2 4 6 10 12 Core Height (Feet)

FIGURE 2 K(Z) - Normalized FQ(X,Y,Z) as a Function of Core Height (TS 3.2.1 )

SEQUOYAH-UNIT 2 Page 166oof 17 Pg 7Rvso Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 120 110 100

--- K-I I II

- - - L I --

II

-V---

I I

K-I

[-.

Uaccept be_/

90 - -tperatD- 7 -n-I-

80 - -I----/. -- °PecirainI II i I _

70

-- -- i28,o -

60 * -- I--/t- --- I 1-S1 50

  • 6=

'U

(-4b,5o) I I 40 30 I2 20

--- 1--K 10

  • l--

I -I 0v I.

-50 -40 -30 -20 -10 0 10 20 30 40 50 Flux Difference (hl) %

FIGURE 3 AXIAL FLUX DIFFERENCE Limits As A Function of RATED THERMAL. POWER

.For Burnup Range 0 EFPD to EOL (TS 3.2.3)

This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in oPeration.

If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable *power level must be reduced by 1.3% in power, and the AFD limit lines must be made more restrictive by 1% in AFO until the LEFM is returned to operation.

SEQUOYAH-UNIT 2 Pg Page 17 7oof 17 7Rvso Revision 1

Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee 37384-2000 November 16, 2015 10 CFR 50.4 ATTN: Document Controi Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328

Subject:

Sequoyah Unit I Cycle 21, and Unit 2 Cycle 20 Core Operating Limits Reports, Revision No. 1

References:

1. Letter from NRC to TVA, "Sequoyah Nuclear Plant, Units 1 and 2

- Issuance of Amendments for the Conversion to the Improved Technical Specifications with Beyond Scope Issues (TAC Nos.

MF3128 and MF3129)," dated September 30, 20015 (ML15238B460)

In accordance with Sequoyah Nuclear Plant (SQN) Units 1 and 2 Technical Specifications (TSs) 5.6.3.d, enclosed is the Unit 1 Cycle 21 Core Operating Limits Report (COLR), Revision 1, and Unit 2 Cycle 20OCOLR, Revision 1. In accordance with TSs 5.6.3.d, the COLRs are required to be provided to the Nuclear Regulatory Commission (NRC) within 30 days of issuance for each reload cycle. Sequoyah Units 1 and 2 were issued license amendment Nos. 334 and 327, respectively for improved standard TSs (Reference 1). These license amendments resulted in the revisions to each of the COLRs as discussed in Enclosure 1. The revised COLRs became effective on October 21, 2016.

There are no new regulatory commitments in this letter. If you have any questions, please contact Jonathan Johnson, SQN Site Licensing Manager at (423) 843-8129.

Soso

U.S. Nuclear Regulatory Commission Page 2 November 16, 2015 Sequoyah Nuclear Plant Enclosures

1. Units 1 and 2 Core Operating Limits Report Changes
2. Sequoyah Unit I Cycle 21 Core Operating Limits Report, Revision 1
3. Sequoyah Unit 2 Cycle 20 Core Operating Limits Report, Revision 1 ZTK: DVG Enclosures cc (Enclosures):

NRC Regional Administrator - Region II NRC Senior Resident Inspector - SQN

ENCLOSURE1I SEQUOYAH UNITS 1 AND 2 CORE OPERATING LIMITS REPORT CHANGES The following describes the changes made to each Units' Core Operating Limits Report (COLR), as result of the NRC review and approval of License Amendment Request for the conversion of the Sequoyah Technical Specification (TS) to Improved Standard Technical Specification, NUREG-1 431, Revision 4.

1. Acronyms for All Rods Out (ARO) and Hot Zero THERMAL POWER (HZP) were removed from the COLRs.
2. In Section 1.0, a table was added to assist user of the COLRs.
3. Section 2.0 was updated to align the new TSs Reporting Requirements Section, 5.6.3, "Core Operating Limits Report".
4. In Section 2.1 the Cycle-Specific Parameter Limits were relocated from the TSs to the COLRs. These parameters involve the Shutdown Margin requirements with references to the associated Limiting Condition for Operation (LCO).
5. 60 ppm Moderator Temperature Coefficient limits were added in "Section 2.2 consistent with the NOTE in TSs LCO 3.1.3, "Moderator Temperature Coefficient," Surveillance Requirement 3.1.3.2.
6. Control Bank Insertion Limits requirement were added in Section 2.4 as necessary for TSs LCO 3.1.6, "Control Bank Insertion Limits," Surveillance Requirements.
7. Section 2.5 was revised to add information relocated from previous TSs for consistency with approved TSs LCO 3.2.1, "Heat Flux Hot Channel Factor (Fq(X, Y, Z))".
8. Section 2.6 was revised to add information relocated from previous TSs for consistency with approved TSs LCO 3.2.2, 'Nuclear Enthalpy Rise Hot Channel Factor F&H(X, Y)".
9. Power Distribution Limits coefficient definitions, such as BQNOM and BHDES, were eliminated as these are defined in the TS Bases.
10. The boron concentration limit for TSs LCO 3.9.1, 'Boron Concentration," were added to the COLRs consistent with the approved TVA License Amendment Request.

ENCLOSURE 2 SEQUOYAH UNIT 1 CYCLE 21 CORE OPERATING LIMITS REPORT REVISION 1

QA Record QARcordL36 151009 802 SEQUOYAH UNIT 1 CYCLE 21 CORE OPERATING LIMITS REPORT REVISION 1 October 2015 Prepared by:

Christine A. Setter, PWR Fuel Engineering Date Verified by:

John E. Strange, P R Fuel Engineering Reviewed by:

Date Kathl&*i',A unningham, PW Fuengneig ManagerL Date radnS. Catalanotto, Reactor Engineering Manager Approved by:

/ '&,/S Date Revision Pages affected All Reason for Revision: *Update for Improved Technical Specifications ('ITS) Implementation SEQUOYAH-UNIT 1Pae1o16Rvsn1 Page 1 of 16 Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 1.0 CORE OPERATING LIMITS REPORT This CORE OPERATING LIMITS REPORT (COLR) for Sequoyah Unit I Cycle 21 has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.3.

The TSs affected by this Report are listed below:

TS COLR COLR Section Technical Specification COLR Parameter Section Page 3.1.1 SHUTDOWN MARGIN (SDM) SDM 2.1 3 BOL MTC Limit 2.2.1 4 3.3 Moderator Temperature EOL MTC Limit "2.2.2 4 313 Coefficient (MTC) 300 ppm Surveillance Limit 2.2.3 4

________________60 ppm Surveillance Limit 2.2.4 4 3.1.4 Rod Group Alignment Limits SDM 2.1.3 3 Shutdown Bank Insertion Limits 2.3 4 3.1.5 Shutdown Bank Insertion LimitsSD2.4 3 CotoS BnDnsrinMiit 2.14 5 3.1.6rConrolnBanknnsertion imitstSD 2.1. 3 3.1.8 PHYSICS TESTS Exceptions- SDM 2.1.6 3 MODE 2 -___________ __

FQ 2.5.1 6 K(Z) 2.5.2 6 NSLOPEAFD 2.5.3 6 321 Heat Flux Hot Channel Factor PSLOPEAFD 2.5.4 6 321 (F0 (X,Y,Z)) NSLOPEf 2 (Al) 2.5.5 6 PSLOPEf 2 (AI) 2.5.6 6 FQ(X,YZ) Appropriate Factor 2.5.7 6 ITS LCO 3.2.1 Required Action A.3 2.5.8 6 MAP(X,Y,Z) 2.6.1 6 RRH 2.6.2 6 Nuclear Enthalpy Rise Hot TRH2.3 6 3.2.2263 Channel Factor (FAH(XY)) FAH(X,Y) Appropriate Factor 6 2.6.4 7 ITS 3.2.2 Required Action A.4 2.6.5 7 ITS 3.2.2 Required Action B.1 2.6.6 7 3.2.3 AXIAL FLUX DIFFERENCE AFD Limits 2.7 7 (AFD)___

3.3.1 Reactor Trip System (RTS) QTNL, QTPL, QTNS, and QTPS 2.8.1 8 Instrumentation QPNL, QPPL, QPNS, and QPPS 2.8.2 9 3.9.1 Boron Concentration Refueling Boron Concentration 2.9 9 5.6.3 CORE REOT(OR OPERATING LIMITS Aayia ehd nltclMtos2.0 3 SEQUOYAH-UNIT 1Pae2o16Rvsn1Page 2 of 16 Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.0 .OPERATING LIMITS The cycle-specific parameter limits for the TS listed in section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in TS 5.6.3. The versions of the topical reports which describe the methodologies used for this cycle are listed in Table 1.

The following abbreviations are used in this section:

BOL stands for Beginning of Cycle Life EOL stands for End of Cycle Life RTP stands for RATED THERMAL POWER 2.1 SHUTDOWN MARGIN - SDM (TS 3.1 .1, 3.1.4, 3.1.5, 3.1.6, 3.1.8) 2.1.1 For TS 3.1.1, SDM shall be ->1.6%Ak/k in MODE 2 with keff < 1.0, MODE 3 and MODE 4

  • 2.1.2 For TS 3.1.1, SDM shall be > 1.0 %Ak/k in MODE 5.

2.1.3 For TS 3.1.4, SDM shall be > 1.6 %Ak/k in MODE 1 and MODE 2.

2.1.4 For TS 3.1.5, SDM shall be >-1.6 %Ak/k in MODE 1 and MODE 2.

2.1.5 For TS 3.1.6, SDM shall be --.1.6 %Alk/

in MODE 1 and MODE 2 with keff> 1.0.

2.1.6 For TS 3.1.8, SDM shall be _>1.6 %Ak/k in MODE 2.

SEQUOYAH-UNIT 1 ae3o Page 6Rvso 3 of 16 Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.2 Moderator Temperature Coefficient - MTC (TS 3.1.3) 2.2.1 The BOL MTC limit is: ,*

less positive than -0.05 x10-5 Ak/k/ 0 F.

2.2.2 The EOL MTC limit is:

less negative than or equal to -4.50 x 10.4 Ak/k/°F.

2.2.3 The 300 ppm Surveillance limit is:

less negative than or equal to -3.74 x 10-4 Ak/k/°F.

2.2.4 The 60 ppm Surveillance limit is:

less negative than or equal to -4.15 xl10 Ak/k/0 F.

2.3 Shutdown Bank Insertion Limits (TS 3.1.5) 2.3.1 Each shutdown bank shall be withdrawn to a position as defined below:

SEQUOYAH-UNIT 1 ae4o page 6Rvso 4 of 16 Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.4 Control Bank Insertion Limits (TS 3.1.6) 2.4.1 The control banks shall be limited in physical insertion as shown in Figure 1.

2.4.2 Each cOntrol bank shall be considered fully withdrawn from the core at>__225 steps.

2.4.3 The control banks shall be operated in sequence by withdrawal of Bank A, Bank B, Bank C, and Bank D. The control banks shall be sequenced in reverse order upon insertion.

2.4.4 Each control bank not fully withdrawn from the core shall be operated with the following overlap as a function of full out position.

Full Out Position (steps) Bank Overlap (steps) Bank Difference (steps) 225 97 128 226 98 128 227 99 128 228 100 128 229 101 128 230 102 128 231 103 128 SEQUOYAH-UNIT 1 ae 5 off16Rvso Page 16 Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.5 Heat Flux Hot Channel Factor - FQ(X,Y,Z) (TS 3.2.1) 2.5.1 FQRT- 2.62 2.5.2 K(Z) is provided in Figure 2 2.5.3 NSLOPEAFD = 1.21 2.5.4 PSLOPEAFD = 1.55 2.5.5 NSLOPEf2 (AI) = 1.48 2.5.6 PSLOPEf 2(AI) = 2.00 2.5.7 The appropriate factor for increase in FQM(X,Y,Z) for compliance with SR 3.2.1.2 and SR 3.2.1.3 is specified as follows:

For all cycle burn ups, use 2.0%

2.5.8 ITS LCO 3.2.1 Required Action A.3 reduces the Overpower Delta T Trip setpoints (value of K< 4) at least 1% (in AT span) for each 1% that FQC(x,Y,Z) exceeds its limit.

2.6 Nuclear Enthalpy Rise Hot Channel Factor - FAH(X,Y) (TS 3.2.2) 2.6.1 MAP(X,Y,Z) is provided in Table 2.

2.6.2 RRH=3.34 when 0.8 <P<*1.0 RRH=1.67 whenP<0.8 P = THERMAL POWER / RATED THERMAL POWER RRH = Thermal power reduction required to compensate for each 1% that FAH(X,Y) exceeds its limit.

2.6.3 TRH = 0.0334 when 0.8 < P < 1.0 TRH = 0.0167 when P < 0.8 P = THERMAL POWER / RATED THERMAL POWER TRH = Reduction in Overtemperature Delta T K1 setpoint required to compensate for each 1% that FAH(X,Y) exceeds its limit.

SEQUOYAH-UNIT 1Pae6o16RvsnIPage 6 of 16 Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.6.4 The appropriate factor for increase in FAHM (X,Y) for compliance with-SR 3.2.2.1 and SR 3.2.2.2 is specified as follows:

For all cycle burnups, use 2.0%

2.6.5 ITS 3.2.2 Required Action A.4 reduces the Overtemperature Delta T setpoint (K1 term in Table 3.3.1-1) by > TRH multiplied by the FAH min margin.

  • 2.6.6 ITS 3.2.2 Required Action B.1 reduces the Overtemperature Delta T setpoint (K1 term in Table 3.3.1-1) by >-TRH multiplied by the f1(Al) min margin.

2.7 AXIAL FLUX DIFFERENCE - AFD (TS 3.2.3) 2.7.1 The AFD limits are specified in Figure 3 SEQUOYAH-UNIT 1Pae7o16RvsnIPage 7 of 16 Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.8 Reactor Trip System Instrumentation (TS *3.3.1) 2.8.1 Trip Reset Term [f1(Al)] for Overtemperature Delta-T Trip

  • The following parameters are required to specify the power level-dependent f1(AI) trip reset term limits for Table 3.3.1-1 (function 6), Overtemperature Delta-T trip function:

2.8.1.1 QTNL = -20%

where QTNL = the maximum negative Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.

2.8.1.2 QTPL = +5%

where QTPL = the maximum positive Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.

2.8.1.3 QTNS = 2.50%

where QTNS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QTNL).

2.8.1.4 QTPS = 1.40%

where QTPS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its positive limit at RATED THERMAL POWER (QTPL).

SEQUOYAH-UNIT 1 ae8o Page 8 of 166Rvso Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 2.8.2 Trip Reset Term [f2 (AI)] for Overpower Delta-T Trip The following parameters are required to specify the power level-dependent f2(AI) trip reset term limits for Table 3.3.1-1 (function 7),

Overpower Delta-T trip function:

  • 2.8.2.1 QPNL = -25%

where QPNL = the maximum negative Al setpoint at RATED THERMAL *POWER at which the trip setpoint is not reduced by the axial power distribution.

2.8.2.2 QPPL = +25%

where QPPL = the maximum positive Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.

2.8.2.3 QPNS = 1.70%

where QPNS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QPNL).

2.8.2.4 QPPS = 1.70%

where QPPS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al

> exceeds its positive limit at RATED.THERMAL POWER (QPPL).

2.9 Boron Concentration (TS 3.9.1) 2.9.1 The refueling boron concentration shall be z 2080 ppm.

SEQUOYAH-UNIT 1 ae9o Page 9 of 166Rvso Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 Table 1 COLR Methodology Topical Reports

1. BAW-10180-A, Revision 1, "NEMO-Nodal Expansion Method Optimized," March 1993.

(Methodology for TS 3.1 .1-SHUTDOWN MARGIN, 3.1 .3-Moderator Temperature Coefficient, 3.9.1-Boron Concentration)

2. BAW-10169P-A, Revision 0, "RSG Plant Safety Analysis-B&W Safety Analysis Methodology for Recirculating Steam Generator Plants," October 1989.

(Methodology for TS 3.1 .3-Moderator Temperature Coefficient)

3. BAW-10163P-A, Revision 0, ."Core Operating Limit Methodology for Westinghouse-Designed PWRs," June 1989.

(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f1 (AI), f2(AI) limits],

3.1.5-Shutdown Bank Insertion Limits, 3.1.6-Control Bank Insertion Limits, 3.2.1-Heat F~lux Hot Channel Factor, 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.2.3-AXIAL FLUX DIFFERENCE)

4. EMF-2328(P)(A), "PWR Small Break LOCA Evaluation Model,"' March 2001.

(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)

5. BAW-10227P-A, Revision 1, "Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel," June 2003.

(Methodology for TS 3.2.1-Hleat Flux Hot Channel Factor)

6. BAW-10186P-A, Revision 2, "Extended Burnup Evaluation," June 2003.

(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)

7. EMF-2103P-A, Revision 0, "Realistic Large Break LOCA Methodology for Pressurized Water Reactors,". April 2003.

(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)

8. BAW-1 0241 P-A, Revision 1, "BHTP DNB Correlation Applied with LYNXT," July 2005.

(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])

9. BAW-10199P-A, Revision 0, "The BWU Critical Heat Flux Correlations," August 1996.

(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])

10. BAW-10189P-A, "CHF Testing and Analysis of the Mark-BW Fuel Assembly Design,"

January 1996.

(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])

1 1. BAW-10159P-A, "BWCMV Correlation of Critical Heat Fluxin Mixing Vane Grid Fuel Assemblies," August .1990.

(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])

12. BAW-10231P-A, Revision 1, "COPERNIC Fuel Rod Design Computer Code," January 2004.

(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f2 (AI) limits])-

SEQUOYAH-UNIT 1 ae110 off16Rvso Page 16 Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 Table 2 Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation (TS 3.2.2)

AXlAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) 1 1.8128 1 2.5969 2 1.8125 2 2.5380 3 1.8122. 3 2.4827 4 1.8119 4 2.4411 5 1.8115 5 2.4315 1.1 6 1.8109 1.4 6 2.4800 7 1.8106 7 2.5356 8 1.8104 8 2.4447 9 1.8098 9 2.3555 10 1.8092 10 2.1738 11 1.7599 11 2.0238 1 2.0671 1 2.6723 2 2.0664 2 2.6061 3 2.0656 3 2.5417 4 2.0649 4 2.4913 5 2.0642 5 2.4801 1.2 6 2.0636 1.5 6 2.5380 7 2.0624 7 2.6273 8 2.0615 8 2.5311 9 2.0457 9 2.4447 10 1.9492 10 2.2772 11 - 1.8589 11 2.0975 1 2.3433 1 2.7308 2 2.3419 2 2.6605 3 2.3412 3 2.5947 4 2.3397 4 2.5371 5 2.3389 5 2.5234 1.3 6 2.3381 1.6 6 2.5906 7 2.3357 7 2.7077 8 2.3130 8 2.6117 9 2.1886 9 2.5240 10 2.0643 10 2.3758

______11 1.9439 11 2.1662 SEQUOYAH-UNIT 1 ae111 off16Rvso Page 16 Revision 1

Uont in CYCEd2 2EUA TableFO Table 2 (continued)

AXIAL(X,Y) ELEVATION(ft) MAP(X,Y,Z) AXIAL(X,Y) ELEVATION (if) MAP(X,Y,Z) 1 2.7664 1 2.4339 2 2.7083 2 2.4060 3 2.6380 3 2.3856 4 2.5791 4 2.3423 5 2.5639 5 2.3114 1.7 6 2.6359 >1.9 6 2.6006 7 2.7795 7 2.5003 8 2.6870 8 2.4004 9 " 2.5798 9 2.2989 10 2.4726 10 2.1483 11 2.2304 11 . 1.9630 1 2.7963 1 2.5057 2 2.7466 2 2.4754 3 2.6775 3 2.4449 4 2.6172 4 2.3591 5 2.6010 5 2.4205 1.8 6 2.6802 2.1 6 2.7643 7 2.8456 7 2.6474 8 2.7552 8 2.5360 9 2.6648 9 2.4400 10 2.5655 10 2.3277 11 2.2931 11 2.0549 1 2.8235 1 2.5380 2 2.7739 2 2.5216 3 2.7125 3 2.4619 4 2.6523 4 2.4294 5 2.6328 5 2.4290 1.9 6 2.7200 2.3 6 2.8222 7 2.9065 7 2.7334 8 2.8193 8 2.6234 9 2.7288 9 2.5186 10 2.6384 10 2.4215

______11 2.3482 _____11 2.1250 SEQUOYAH-UNIT I1ae1 Page 12 off16Rvso 16 Revision 1

2 2EUA UcnItinCYCEd TableFO Table 2 (continued)

AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) 1 2.6440 1 2.2448 2 2.5160 2 2.5535 3 2.5045 3 2.4678 4 2.4488 4 2.3229 5 2.5803 5 2.8913 2.5 6 2.9481 3.1 6 3.1515 7 2.8544 7 3.0181 8 2.7286 8 2.9699 9 2.6450 9 2.8941 10 2.5527 10 2.7819 11 2.1731 11 2.1866 1 2.5554 1 2.0228 2 2.5529 2 2.5172 3 2.5197 3 2.4007 4 2.4375 4 2.2195 5 2.5643 5 3.0496 2.7 6 2.9839 3.3 6 3.2226 7 2.8837 7 3.1446 8 2.7939 8 3.0350 9 2.7040 9 2.9688 10 2.5997 10 2.8533 11 2.1995 11 2.1473 1 2.4223 1 1.7563 2 2.5653 2 2.4566 3 2.5075 3 2.3062 4 2.3955 4 2.0854 5 2.7295 5 3.2045 2.9 6 3.0921 3.5 6 3.2929 7 3.0070 7 3.2627 8 2.8896 8 3.0846 9 2.8058 9 3.0299 10 2.6974

  • 10 2.9117

_____11 2.2039 _____11 2.0862 SEQUOYAH-UNIT 1 Pg 13 Page 3oof 16 6Rvso Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 231

{Fu]* %%%hdr'a*.* RegiGn)* (.575*225}

220 p Regior~

(FuI~y Withdn~wn - (575~225)

'Inn I 14160/'*B 0-

/ ABANK D Cl) 820 rm 0

400 20 __ _ _ _ _

40 0.2 0.4 0.6 0_8 I (Fully Inserted)

Fraction of RATED THERMAL POWER FIGURE 1 Rod Bank Insertion Limits Versus THERMAL POWER, Four Loop Operation (TS 3.1.6)

  • Fully withdrawn region shall be the condition where shutdown and control banks are at a position within the interval of Ž225 and <231 steps withdrawn, inclusive.

Fully withdrawn shall be the position as defined below Cycle Burnup (MWd/mtU) Steps Withdrawn

>0 ->225 to < 231 This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.

If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the rod insertion limit lines must be increased by 3 steps withdrawn until the LEFM is returned to operation.

SEQUOYAH-UNIT 1 ae114 off16Rvso Page 16 Revision 1

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 1.2 1.0 Eeaio K Iz) 0.8

( )

0.00 1000 6,25 1000 0.6

\ I 0.4 I i

I Elvaio K!z 0.2 0.0 0 2 4 6- 8 10 12 Core Height (Feet)

FIGURE 2 K(Z) - Normalized FQ(X,Y,Z) as a Function of Core Height (TS 3.2.1)

SEQUOYAH-UNIT 1 Page 15 of 16 Revision 1 Rvso

COLR FOR SEQUOYAH UNIT 1 CYCLE 21 120 COLR FOR SEQUOYAH UNIT 1 CYCLE 21 I II I I 110 100 (710) UnaccieptableI_

90

- - hOpe rationI a.

0 80 0

0.

70 - _ -. I_

'I 60 I-a'U 50 II-0 40 30

]

I q L I

20 I I S I I1 10 I I 0 '  ! i '

-50 -40 -30 -20 -10 0 10 20 30 40 50 Flux Difference (Al) %

FIGURE 3 AXIAL FLUX DIFFERENCE Limits As A Function of RATED THERMAL POWER For Burnup Range 0 EFPD to EOL (TS 3.2.3)

This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.

If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the AFD limit lines must be made more restrictive by 1% in AFD until the LEFM is returned to operation.

SEQUOYAH-UNIT 1 Pg 166oof 16 Page 6Rvso Revision 1

ENCLOSURE 3 SEQUOYAH UNIT 2 CYCLE 20 CORE OPERATING LIMITS REPORT REVISION 1

QA Record QARcordL36 151009 803 SEQUOYAH UNIT 2 CYCLE 20 CORE OPERATING LIMITS REPORT REVISION I October 2015 Prepared by:

Christine A. Setter, PWR Fuel Engineering Date Verified by:

Jol*E.Strange., P,5R* Fuel Engineering / DatO!e Reviewed by:

K *he1A.Cnigam, PWR Fuel Engineering Manager Date Brandon S. Catalanotto, Reactor Engineering Manager Date/

/

Approved by:

PORC Chairman Date Plant Manager 'Date Revision .. _1 Pages affected All Reason for Revision: Update for Improved Technical Specifications (ITS) Implementation SEQUOYAH-UNJT 2Pae1o17Rvsn1 Page 1 of 17 Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 1.0 CORE OPERATING LIMITS REPORT This CORE OPERATING LIMITS REPORT (COLR) for Sequoyah Unit 2 Cycle 20 has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.3.

The TSs affected by this Report are listed below:

TS COLR COLR Section Technical Specification COLR Parameter Section Page 3.1.1 SHUTDOWN MARGIN (SDM) SDM 2.1 3 BOL MTC Limit 2.2.1 4 313 Moderator Temperature EOL MTC Limit 2.2.2 4 Coefficient (MTC) 300Oppm Surveillance Limit 2.2.3 4 60 ppm Surveillance Limit 2.2.4 4 3.1.4 Rod Group Alignment Limits SDM 2.1.3 3 Shutdown Bank Insertion Limits 2.3 4 3.1.5 Shutdown Bank Insertion LimitsSD214 3 CotoS anDnetinLmt 2..4 5 3.1.6rCntrolnBnkIInsetionnLiitsiSs 2.14 3 3.1.8 PHYSICS TESTS Exceptions - SDM 2.1.6 3 MODE 2 FTP 2.5.1 6 K(Z) 2.5.2 6 NSLOPEAFD 2.5.3 6 321 Heat Flux Hot ChanneiFactor PSLOPEAFD 2.5.4 6 (F0 (X,Y,Z)) NSLOPEf 2 (AI) 2.5.5 6 PSLOPEf 2 (AI) 2.5.6 6 FQ(X,Y,Z) Appropriate Factor 2.5.7 6

___________________ITS LCO 3.2.1 Required Action A.3 2.5.8 6 MAP(X,Y,Z) 2.6.1 6 RRH 2.6.2 6 322 Nuclear Enthalpy Rise Hot TRH 2.6.3 6 Channel Factor (FAH(X,Y)) FAH(X,Y) Appropriate Factor 2.6.4 7 ITS 3.2.2 Required Action A.4 2.6.5 7 ITS 3.2.2 Required Action B.1 2.6.6 7 323 AXIAL FLUX DIFFERENCE AOLmt .

(AFD) _ _ _ _ _ _ _ _ _ _ _

331 Reactor Trip System (RTS) QTNL, QTPL, QTNS, and QTPS 2.8.1 8 Instrumentation QPNL, QPPL, QPNS, and QPPS 2.8.2 9 3.9.1 Boron Concentration Refueling Boron Concentration 2.9 9 5.6.3 CORE REOT(OR OPERATING LlMITS Aayia nltclMtos2.0 ehd 3 SEQUOYAH-UNIT 2Pae2o17Risn1 Page 2 of 17 Revision 1

COLR FoR SEQUOYAH UNIT 2 CYCLE 20 2.0 OPERATING LIMITS The cycle-specific parameter limits for the TS listed in section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in TS 5.6.3. The versions of the topical reports which describe the methodologies used for this cycle are listed in Table 1.

The following abbreviations are used in this section:,

BOL stands for Beginning of Cycle Life EOL stands for End of Cycle Life RTP stands for RATED THERMAL POWER 2.1 SHUTDOWN MARGIN - SOM (TS 3.1.1, 3.1.4, 3.1.5, 3.1.6, 3.1.8) 2.1.1 For TS 3.1.1, SOM shall be >_1.6 %Ak/k in MODE 2 with keff < 1.0, MODE 3 and MODE 4 2.1.2 For TS 3.1.1, SDM shall be >_1.0 %Ak/k in MODE 5.

2.1.3 For TS 3.1.4, SDM shall be >1.6 %Ak/k in MODE 1 and MODE 2.

2.1.4 For TS 3.1.5, SDM shall be >_1.6 %Ak/k in MODE 1 and MODE 2.

2.1.5 For TS 3.1.6, SDM shall be >__1.6 %Ak/k in MODE 1 and MODE 2 with keff> 1.0.

2.1.6 For TS 3.1.8, SDM shall, be >_.1.6 %Ak/k in MODE 2.

SEQUOYAH-UNIT 2Pae3o17RvsnIPage 3 of 17 .Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.2 Moderator Temperature Coefficient - MTC (TS 3.1.3) 2.2.1 The BOL MTC limit is:

less positive than -0.16 x10-5 Ak/k/°F.

2.2.2 The EOL MTC limit is:

less negative than or equal to -4.50 x 10 A Ak/k/°F.

2.2.3 The 300 ppm Surveillance limit is:

less negative than or equal to -3.75 x 104 Ak/k/°F.

2.2.4 The 60 ppm Surveillance limit is:

less negative than or equal to -4.20 x10A Ak/k/°F.

2.3 Shutdown Bank Insertion Limits (TS 3.1.5) 2.3.1 Each shutdown bank shall be withdrawn to a position as defined below:

SEQUOYAH-UNIT 2Pae4o17RvsnI*Page 4 of 17 Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.4 Control Bank Insertion Limits (TS 3.1.6) 2.4.1 The control banks Shall be limited in physical insertion as shown in Figure 1.

2.4.2 Each control bank shall be considered fully withdrawn from the core at>__225 steps.

2.4.3 The control banks shall be operated in sequence by withdrawal of Bank A, Bank B, Bank C, and Bank 0. The control banks shall be sequenced in reverse order upon insertion.

2.4.4 Each control bank not fully withdrawn from the core shall be operated with the following overlap as a function of full out position.

Full Out Position Bank Overlap Bank Difference (ts) (steps) (steps) 225 9712 226 9812 227 99 128__________

228 100 128 229 101 128 230 102 128 231 103 "128 SEQUOYAH-UNIT 2Pae5o17RvsnIPage 5 of 17 Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.5 Heat Flux Hot Channel Factor- FQ(X,Y,Z) (TS 3.2.1)

RTP 2.5.1 FQ = 2.62 2.5.2 K(Z) is provided in Figure 2 2.5.3 NsLoPEAFD = 1.44 2.5.4 PSLOPEAFD = 1.76-2.5.5 NSLOPEf 2(/I) = 1.48 2.5.6 PSLOPEf 2(AI) = 2.98 M

2.5.7 The appropriate factor for increase in FQ (X,Y,Z) for compliance with SR 3.2.1.2 and SR 3.2.1.3 is specified as follows:

For cycle burnups: 0 to 3312 MWd/mtU, use 2.0%

For cycle burnups: > 3312 to 3864 MWd/mtU, use 2.12%

For cycle* burnups: > 386,4 MWd/mtU, use 2.0%

2.5.8 ITS LCO 3.2.1 Required Action A.3 reduces the Overpower Delta T Trip setpoints (value of K4 ) at least 1% (in AT span) for each 1% that FQC(X,Y,Z) exceeds its limit.

2.6 Nuclear Enthalpy Rise Hot Channel Factor - FAH(X,Y) (TS 3.2.2) 2.6.1 MAP(X,Y,Z) is provided in Tables 2a and 2b.

2.6.2 RRH = 3.34 when 0.8 < P_* 1.0 RRHIl.67 whenP<0.8 P = THERMAL POWER / RATED THERMAL POWER RRH = Thermal power reduction required to compensate for each

  • 1% that FAH(X,Y) exceeds its limit.

2.6.3 TRH = 0.0334 when 0.8 < P < 1.0 TRH = 0.01 67 when P < 0.8 P = THERMAL POWER I RATED THERMAL POWER TRH = Reduction in Overtemperature Delta T K1 setpoint required to compensate for each 1% that FAH(X,Y) exceeds its limit.

SEQUOYAH-UNIT 2 Pg Page 6 off117 Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.6.4 The appropriate factor for increase in FAHM (X,Y) for compliance with SR 3.2.2.1 and SR 3.2.2.2 is specified as follows:

For all cycle burnups, use 2.0%:

2.6.5 ITS 3.2.2 Required Action A.4 reduces the overtemperature Delta T setpoint (K1 term in Table 3.3.1-1) by > TRH multiplied by the FAN min margin.

2.6.6 ITS 3.2.2 Required Action 8.1 reduces the Overtemperature Delta T setpoint (K1 term in Table 3.3.1-1) by > TRH multiplied by the f1 (Al) min margin.

2.7 AXIAL FLUX DIFFERENCE - AFD (TS 3.2.3) 2.7.1 The AFD limits are specified in Figure 3 SEQUOYAH-UNIT 2Pae7o17RvsnI Page 7 of 17 Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.8 Reactor Trip System Instrumentation (TS 3.3.1) 2.8.1 Trip Reset Term [f1(AI)] for Overtemperature Delta-T Trip The following parameters are required to specify the power level-dependent f1(AI) trip reset term limits for Table 3.3.1-1 (function 6), Overtemperature Delta-T trip function:

2.8.1 .1 QTNL = -20%

where QTNL = the maximum negative Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.

2.8.1.2 QTPL = +5%

where QTPL = the maximum positive AlI setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.

2.8.1.3 QTNS = 2.50%

where QTNS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QTNL).

2.8.1.4 QTPS = 1.40%

where QTPS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of Al exceeds its positive limit at RATED THERMAL POWER (QTPL).

SEQUOYAH-UNIT 2Pae8o17Rvsn1Page 8 of 17 Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 2.8.2 Trip Reset Term [fz(AI)] for Overpower Delta-T Trip The following parameters are required to specify the power level-dependent f2 (AI) trip reset term limits for Table 3.3.1-1 (function 7), Overpower Delta-T trip function:

.2.8.2.1 QPNL =-25%

Where QPNL = the maximum negative Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.

2.8.2.2 QPPL = +25%

where QPPL = the maximum positive Al setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.

2.8.2.3 QPNS = 1.70%

where QPNS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al exceeds its negative limit at RATED THERMAL POWER (QPNL).

2.8.2.4 QPPS = 1.70%

where QPPS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of Al exceeds its positive limit at RATED THERMAL POWER (QPPL).

2.9 Boron Concentration (TS 3.9.1) 2.9.1 The refueling boron concentration shall be > 2000 ppm.

SEQUOYAH-UNIT 2Pae9o17Rvsn1 Revision 1 Page 9 of 17

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 Table 1 COLR Methodology Topical Reports

1. BAW-1 0180-A, Revision 1, "NEMO-Nodal Expansion Method Optimized," March 1993.

(Methodology for TS 3.1.1-SHUTDOWN MARGIN, 3.1.3-Moderator Temperature Coefficient, 3.9.1-Boron Concentration)-

2. BAW-10169P-A, Revision 0, "RSG Plant Safety Analysis-B&W Safety Analysis Methodology for Recirculating Steam Generator Plants," October 1989.

(Methodology for TS 3.1 .3-Moderator Temperature Coefficient)

3. BAW-1 01 63P-A, Revision 0, "Core Operating Limit Methodology for Westinghouse-Designed PWRs," June 1989.

(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f1(AI), f2(AI) limits],

3.1.5-Shutdown Bank Insertion Limits, 3.1.6-Control Bank Insertion Limits, 3.2.1-Heat Flux Hot Channel Factor, 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.2.3-AXIAL FLUX DIFFERENCE)

4. EMF-2328(P)(A), "PWR Small Break LOCA Evaluation Model," March 2001.

(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)

5. BAW-1 0227P-A, Revision 1, "Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel,"' June 2003.

(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)

6. BAW-10186P-A, Revision 2, "Extended Burnup Evaluation," June 2003.

(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)

7. EMF-2103P-A, Revision 0, "Realistic Large Break LOCA Methodology for Pressurized Water Reactors," April 2003.

(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)

8. BAW-1 0241 P-A, Revision 1, "BHTP DNB Correlation Applied with LYNXT," July 2005.

(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])

9. BAW-10199P-A, Revision 0, "The BWU Critical Heat Flux Correlations," August 1996.

(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])

10. BAW-10189P-A, "CHF Testing and Analysis of the Mark-BW Fuel Assembly Design,"

January 1996.

(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(Al) limits])

11. BAW-1 01 59P-A, "BWCMV Correlation of Critical Heat Flux in Mixing Vane Grid Fuel Assemblies," August 1990.

(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(AI) limits])

12. BAW-10231 P-A, Revision .1, "COPERNIC Fuel Rod Design Computer Code," January 2004.

(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f2(Al) limits])

SEQUOYAH-UNIT 2 Pg Page 100oof 17 7Rvso Revision 1

CQLR FOR SEQUOYAH UNIT 2 CYCLE 20 Table 2a Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation Advanced W17 HTP TM Fuel (TS 3.2.2)

AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) 1 1.8128 1 2.5969 2 1.8125 2 2.5380 3 1.8122 3 2.4827 4 1.8119 4 2.4411 5 1.8115 5 2.4315 1.1 6 1.8109 1.4 6 2.4800 7 1.8106 7 2.5356 8 1.8104 8 2.4447 9 1.8098 9 2.3555 10 1.8092 10 2.1738

______11 1.7599 11 2.0238 1 2.0671 1 2.6723 2 2.0664 2 2.6061 3 2.0656 3 2.5417 4 2.0649 4 2.4913 5 2.0642 5 2.4801 1.2 6 2.0636 1.5 6 2.5380 7 2.0624 7 2.6273 8 2.0615 8 2.5311 9 2.0457 9 2.4447 10 1.9492 10 2.2772

_____11 1.8589 11 2.0975 1 2.3433 1 2.7308 2 2.3419 2 2.6605 3 2.3412 3. 2.5947 4 2.3397 4 2.5371 5 2.3389 5 2.5234 1.3 6 2.3381 1.6 6 2.5906

-7 2.3357 7 2.7077 8 2.3130 8 2.6117 9 2.1886 9 2.5240 10 2.0643 10 2.3758

______11 1.9439 __ __ _11 2.1662 SEQUOYAH-UNIT 2Pae1of7eisnI Page 11 of 17 Revision 1

YCed 20 CO ablFO2OaH UcnIti2n Table 2a (continued)

AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) AXlAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) 1 ,2.7664 1 2.4339 2 2.7083 2 2.4060 3 2.6380 3 2.3856 4 2.5791 4 2.3423 5 2.5639 5 2.3114 1.7 6 2.6359, >1.9 6 2.6006 7 2.7795 7 2.5003 8 2.6870 8 2.4004 9 2.5798 9 2.2989 10 2.4726 10 2.1483 11 2.2304 _____11 1.9630 1 2.7963 1 2.5057 2 2.7466 2 2.4754 3 2.6775 3 2.4449 4 2.6172 4 2.3591 5 2.6010 5 2.4205 1.8 6 2.6802 2.1 6 2.7643 7 2.8456 7 2.6474 8 2.7552 8 2.5360 9 2.6648 9 2.4400 10 2.5655 10 2.3277 11 2.2931 _____11 2.0549 1 2.8235 1 2.5380 2 2.7739 2 2.5216 3 2.7125 3 2.4619 4 2.6523 4 2.4294 5 2.6328 5 2.4290 1.9 6 2.7200 2.3 6 2.8222 7 2.9065 7 2.7334 8 2.8193 8 2.6234 9 2.7288 9 2.5186 10 2.6384 10 2.4215

_____11 2.3482 _____11 2.1250 SEQUOYAH-UNIT 2Pae1of7 Revision 1 Page 12 of 17

2 2OaH UcnIti2nCYLEd TableFO Table 2a (continued)

AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) 1 2.6440 1 2.2448 2 2.5160 2 2.5535

' 3 2.5045 3 2.4678 4 2.4488 4 2.3229 5 2.5803 5 2.8913 2.5. 6 2.9481 3.1 6 3.1515 7 2.8544 7 3.0181 8 2.7286 8 2.9699 9 2.6450 9 2.8941 10 2.5527 10 2.7819

_____11 2.1731 11 2.1866 1 2.5554 1 2.0228 2 2.5529 2 2.5172 3 2.5197 3 2.4007 4 2.4375 4 2.2195 5 2.5643 5 3.0496 2.7 6 2.9839 3.3 6 3.2226 7 2.8837 7 3.1446 8 2.7939 8 3.0350 9 2.7040 9 2.9688 10 .2.5997 10 2.8533 11 2.1995 11 2.1473 1 2.4223 1. 1.7563 2 2.5653 2 2.4566 3 2.5075 3 2.3062 4 2.3955 4 2.0854 5 2.7295 5 3.2045 2.9 6 3.0921 3.5 6 3.2929 7 3.0070 7 3.2627 8 2.8896 8 3.0846 9 2.8058 9 .3.0299 10 2.6974 10. 2.9117

_____11 2.2039 _____11 2.0862 SEQUOYAH-UNIT 2 Pg Page 133f7Rvso of 17 Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 Table 2b Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation Mark-BW Fuel (TS 3.2.2)

AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) AXIAL(X,Y) ELEVATION (ft) MAP(X,Y,Z) 2 1.9343 2 2.8143 4 1.9300 4 2.9856 1.1 6 1.9234 1.9 6 3.0073 8 1.9115 8 2.8509 10 1.8894 10 2.7048 2 2.1663 2 2.4405 4 2.1558 4 2.4405 1.2 6 2.1410 >1.9 6 2.7376 8 2.1153 8 2.5906

'10 2,0582 10 2.3456 2 *2.4023 2 2.5881 4 2.3825 4 2.5881 1.3 6 2.3599 2.2 6 2.9899 8 2.3100 8 2.7800

_______10 2.1760 10 2.5367 2 2.6453 2 2.6111 4 2.6136 4 2.6111 1.4 6 2.5610 2.6 6 3.2947 8 2.4199 8 3.2055 10 2.2787 10 2.8049 2 2.7189 2 2.9142 4 2.8181 4 2.9142 1.5 6 2.6735 36 4.0216 8 2.5280 8 3.6527 10 2.3749 10 3.1711 2 2.7720 2 2.9618 4 2.9219 4 2.9618 1.7 6 2.8641 3.5 6 4.2351 8 2.7064 8 3.7452 10 2.5539 10 3.3214 SEQUOYAH-UNIT 2 Pg 144oof 17 Page 7Rvso Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 r- /~- BA K C/

  • 140

& (u1208 w100 _______

-* BANK 0D Z80 40 /

20, 0 {.09,o) ________ ________ _______ _______

0 0.2 0.A 0.6 0_8 (Fully Inserted)

Fraction of RATED THERMAL POWER FIGURE 1 Rod Bank Insertion Limits Versus THERMAL POWER, Four Loop Operation (TS 3.1.6)

  • Fully withdrawn region shall be the condition where shutdown and control banks are at a position within the interval of >225 and <231 steps withdrawn, inclusive.

Fully withdrawn shall be the position as defined below, Cycle Burnup (MWd/mtU) Steps Withdrawn

Ž0 Ž 225 to -231 This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.

If the LEEM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the rod insertion limit lines must be increased by 3 steps withdrawn until the LEFM is returned to operation.

SEQUOYAH-UNIT 2 Pg Page 155oof 17 7Rvso Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 1.2 I 2 2 I I 2 I I

- 2 1.0 I I I I I I 2 I 0.8 4-----2 2 2 2 I 2 2 I 2 2 0.6 Elevation K(z)

(ft) 0.000 1.0000 0.4 6.285 1.0000 -~----------

2 7.995 1.0000 2 2 2 2 9.705 1.0000 2 2 2 12.000 1.0000 2 2 0.2 - 2 2 I 2 2 2 2 2 2 2 2 I. 2 2 2 2 I I 2 I I I I 0.0 0 2 4 6 10 12 Core Height (Feet)

FIGURE 2 K(Z) - Normalized FQ(X,Y,Z) as a Function of Core Height (TS 3.2.1 )

SEQUOYAH-UNIT 2 Page 166oof 17 Pg 7Rvso Revision 1

COLR FOR SEQUOYAH UNIT 2 CYCLE 20 120 110 100

--- K-I I II

- - - L I --

II

-V---

I I

K-I

[-.

Uaccept be_/

90 - -tperatD- 7 -n-I-

80 - -I----/. -- °PecirainI II i I _

70

-- -- i28,o -

60 * -- I--/t- --- I 1-S1 50

  • 6=

'U

(-4b,5o) I I 40 30 I2 20

--- 1--K 10

  • l--

I -I 0v I.

-50 -40 -30 -20 -10 0 10 20 30 40 50 Flux Difference (hl) %

FIGURE 3 AXIAL FLUX DIFFERENCE Limits As A Function of RATED THERMAL. POWER

.For Burnup Range 0 EFPD to EOL (TS 3.2.3)

This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in oPeration.

If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable *power level must be reduced by 1.3% in power, and the AFD limit lines must be made more restrictive by 1% in AFO until the LEFM is returned to operation.

SEQUOYAH-UNIT 2 Pg Page 17 7oof 17 7Rvso Revision 1