ML16117A078: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/25/2016
| issue date = 04/25/2016
| title = Rescheduling Indian Point, Unit 2, Triennial Fire Protection Baseline Inspection
| title = Rescheduling Indian Point, Unit 2, Triennial Fire Protection Baseline Inspection
| author name = Rogge J F
| author name = Rogge J
| author affiliation = NRC/RGN-I/DRS/EB3
| author affiliation = NRC/RGN-I/DRS/EB3
| addressee name = Coyle L
| addressee name = Coyle L
Line 9: Line 9:
| docket = 05000247
| docket = 05000247
| license number = DPR-026
| license number = DPR-026
| contact person = Rogge J F
| contact person = Rogge J
| document type = Letter
| document type = Letter
| page count = 3
| page count = 3
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. KING OF PRUSSIA, PA 19406-2713   April 25, 2016 Mr. Lawrence Coyle Site Vice President Entergy Nuclear Operations, Inc.
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249  
KING OF PRUSSIA, PA 19406-2713 April 25, 2016 Mr. Lawrence Coyle Site Vice President Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249


==SUBJECT:==
==SUBJECT:==
RESCHEDULING OF INDIAN POINT 2 TRIENNIAL FIRE PROTECTION     BASELINE INSPECTION
RESCHEDULING OF INDIAN POINT 2 TRIENNIAL FIRE PROTECTION BASELINE INSPECTION


==Dear Mr. Coyle:==
==Dear Mr. Coyle:==


This letter confirms the rescheduling of Indian Point 2 triennial fire protection baseline inspection activity. Our January 5, 2016, letter titled, "Indian Point 2 - Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information," identified the baseline inspection to be conducted as follows:
This letter confirms the rescheduling of Indian Point 2 triennial fire protection baseline inspection activity. Our January 5, 2016, letter titled, Indian Point 2 - Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information, identified the baseline inspection to be conducted as follows:
* Information Gathering Visit: May 3 - 5, 2016
* Information Gathering Visit:   May 3 - 5, 2016
* On-Site Inspection:   May 23 - 27, 2016         June 6 - 10, 2016 This inspection has been rescheduled as follows:
* On-Site Inspection:             May 23 - 27, 2016 June 6 - 10, 2016 This inspection has been rescheduled as follows:
* Information Gathering Visit: November 1 - 3, 2016
* Information Gathering Visit:   November 1 - 3, 2016
* On-Site Inspection:   November 28 - December 2, 2016 December 12 - 16, 2016 The change in schedule was coordinated with Mr. G. Dahl of your staff. If you have any questions regarding the above changes to the baseline inspection schedule, please contact Mr. Dan Orr, Team Leader at (610) 337-5048, or via e-mail at Dan.Orr@nrc.gov In accordance with 10 CFR 2.390 of the NRC's "Rules and Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publically Available Records (PARS) component of NRC's document system (ADAMS).  
* On-Site Inspection:             November 28 - December 2, 2016 December 12 - 16, 2016 The change in schedule was coordinated with Mr. G. Dahl of your staff. If you have any questions regarding the above changes to the baseline inspection schedule, please contact Mr. Dan Orr, Team Leader at (610) 337-5048, or via e-mail at Dan.Orr@nrc.gov In accordance with 10 CFR 2.390 of the NRC's "Rules and Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publically Available Records (PARS) component of NRC's document system (ADAMS).


L. Coyle ADAMS is accessible from the NRC's Website at http://www.nrc.gov/reading-rm/adams.hmtl (the Public Electronic Reading Room).
L. Coyle                                   ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.hmtl (the Public Electronic Reading Room).
Sincerely, /RA/  
Sincerely,
                                            /RA/
John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-247 License No. DPR-26 cc: Distribution via ListServ


John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-247 License No. DPR-26 cc: Distribution via ListServ 
ML16117A078 Non-Sensitive                               Publicly Available SUNSI Review Sensitive                                  Non-Publicly Available OFFICE RI/DRS               RI/DRS NAME   DOrr                 JRogge DATE   04/25/16             04/25/16 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
 
KING OF PRUSSIA, PA 19406-2713 April 25, 2016 Mr. Lawrence Coyle Site Vice President Entergy Nuclear Operations, Inc.
ML16117A078 SUNSI Review  Non-Sensitive Sensitive  Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS    NAME DOrr JRogge    DATE 04/25/16 04/25/16 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. KING OF PRUSSIA, PA 19406-2713   April 25, 2016 Mr. Lawrence Coyle Site Vice President Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249  


==SUBJECT:==
==SUBJECT:==
RESCHEDULING OF INDIAN POINT 2 TRIENNIAL FIRE PROTECTION     BASELINE INSPECTION
RESCHEDULING OF INDIAN POINT 2 TRIENNIAL FIRE PROTECTION BASELINE INSPECTION


==Dear Mr. Coyle:==
==Dear Mr. Coyle:==


This letter confirms the rescheduling of Indian Point 2 triennial fire protection baseline inspection activity. Our January 5, 2016, letter titled, "Indian Point 2 - Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information," identified the baseline inspection to be conducted as follows:
This letter confirms the rescheduling of Indian Point 2 triennial fire protection baseline inspection activity. Our January 5, 2016, letter titled, Indian Point 2 - Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information, identified the baseline inspection to be conducted as follows:
* Information Gathering Visit: May 3 - 5, 2016
* Information Gathering Visit:   May 3 - 5, 2016
* On-Site Inspection:   May 23 - 27, 2016         June 6 - 10, 2016 This inspection has been rescheduled as follows:
* On-Site Inspection:             May 23 - 27, 2016 June 6 - 10, 2016 This inspection has been rescheduled as follows:
* Information Gathering Visit: November 1 - 3, 2016
* Information Gathering Visit:   November 1 - 3, 2016
* On-Site Inspection:   November 28 - December 2, 2016 December 12 - 16, 2016 The change in schedule was coordinated with Mr. G. Dahl of your staff. If you have any questions regarding the above changes to the baseline inspection schedule, please contact Mr. Dan Orr, Team Leader at (610) 337-5048, or via e-mail at Dan.Orr@nrc.gov In accordance with 10 CFR 2.390 of the NRC's "Rules and Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publically Available Records (PARS) component of NRC's document system (ADAMS).  
* On-Site Inspection:             November 28 - December 2, 2016 December 12 - 16, 2016 The change in schedule was coordinated with Mr. G. Dahl of your staff. If you have any questions regarding the above changes to the baseline inspection schedule, please contact Mr. Dan Orr, Team Leader at (610) 337-5048, or via e-mail at Dan.Orr@nrc.gov In accordance with 10 CFR 2.390 of the NRC's "Rules and Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publically Available Records (PARS) component of NRC's document system (ADAMS).
 
L. Coyle ADAMS is accessible from the NRC's Website at http://www.nrc.gov/reading-rm/adams.hmtl (the Public Electronic Reading Room).
Sincerely,  /RA/


John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-247 License No. DPR-26 cc: Distribution via ListServ  
L. Coyle                                  ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.hmtl (the Public Electronic Reading Room).
Sincerely,
                                            /RA/
John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-247 License No. DPR-26 cc: Distribution via ListServ


ML16117A078 SUNSI Review  Non-Sensitive Sensitive  Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS    NAME DOrr JRogge    DATE 04/25/16 04/25/16}}
ML16117A078 Non-Sensitive                               Publicly Available SUNSI Review Sensitive                                  Non-Publicly Available OFFICE RI/DRS               RI/DRS NAME   DOrr                 JRogge DATE   04/25/16             04/25/16}}

Latest revision as of 03:27, 5 February 2020

Rescheduling Indian Point, Unit 2, Triennial Fire Protection Baseline Inspection
ML16117A078
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 04/25/2016
From: Rogge J
Engineering Region 1 Branch 3
To: Coyle L
Entergy Nuclear Operations
Rogge J
References
Download: ML16117A078 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406-2713 April 25, 2016 Mr. Lawrence Coyle Site Vice President Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT:

RESCHEDULING OF INDIAN POINT 2 TRIENNIAL FIRE PROTECTION BASELINE INSPECTION

Dear Mr. Coyle:

This letter confirms the rescheduling of Indian Point 2 triennial fire protection baseline inspection activity. Our January 5, 2016, letter titled, Indian Point 2 - Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information, identified the baseline inspection to be conducted as follows:

  • Information Gathering Visit: May 3 - 5, 2016
  • On-Site Inspection: May 23 - 27, 2016 June 6 - 10, 2016 This inspection has been rescheduled as follows:
  • Information Gathering Visit: November 1 - 3, 2016
  • On-Site Inspection: November 28 - December 2, 2016 December 12 - 16, 2016 The change in schedule was coordinated with Mr. G. Dahl of your staff. If you have any questions regarding the above changes to the baseline inspection schedule, please contact Mr. Dan Orr, Team Leader at (610) 337-5048, or via e-mail at Dan.Orr@nrc.gov In accordance with 10 CFR 2.390 of the NRC's "Rules and Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publically Available Records (PARS) component of NRC's document system (ADAMS).

L. Coyle ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.hmtl (the Public Electronic Reading Room).

Sincerely,

/RA/

John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-247 License No. DPR-26 cc: Distribution via ListServ

ML16117A078 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRS NAME DOrr JRogge DATE 04/25/16 04/25/16 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406-2713 April 25, 2016 Mr. Lawrence Coyle Site Vice President Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT:

RESCHEDULING OF INDIAN POINT 2 TRIENNIAL FIRE PROTECTION BASELINE INSPECTION

Dear Mr. Coyle:

This letter confirms the rescheduling of Indian Point 2 triennial fire protection baseline inspection activity. Our January 5, 2016, letter titled, Indian Point 2 - Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information, identified the baseline inspection to be conducted as follows:

  • Information Gathering Visit: May 3 - 5, 2016
  • On-Site Inspection: May 23 - 27, 2016 June 6 - 10, 2016 This inspection has been rescheduled as follows:
  • Information Gathering Visit: November 1 - 3, 2016
  • On-Site Inspection: November 28 - December 2, 2016 December 12 - 16, 2016 The change in schedule was coordinated with Mr. G. Dahl of your staff. If you have any questions regarding the above changes to the baseline inspection schedule, please contact Mr. Dan Orr, Team Leader at (610) 337-5048, or via e-mail at Dan.Orr@nrc.gov In accordance with 10 CFR 2.390 of the NRC's "Rules and Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publically Available Records (PARS) component of NRC's document system (ADAMS).

L. Coyle ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.hmtl (the Public Electronic Reading Room).

Sincerely,

/RA/

John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-247 License No. DPR-26 cc: Distribution via ListServ

ML16117A078 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRS NAME DOrr JRogge DATE 04/25/16 04/25/16