| title = Requalification Program Inspection - Joseph M. Farley Nuclear Plant
| title = Requalification Program Inspection - Joseph M. Farley Nuclear Plant
| author name = Guthrie E F
| author name = Guthrie E
| author affiliation = NRC/RGN-II/DRS/EB2
| author affiliation = NRC/RGN-II/DRS/EB2
| addressee name = Gayheart C A
| addressee name = Gayheart C
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000348, 05000364
| docket = 05000348, 05000364
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 28, 2016 Mrs. Cheryl A. Gayheart Vice President  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 28, 2016 Mrs. Cheryl A. Gayheart Vice President Southern Nuclear Operating Company, Inc.
 
Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319
Southern Nuclear Operating Company, Inc.  
 
Joseph M. Farley Nuclear Plant  
 
7388 North State Highway 95 Columbia, AL 36319  


==SUBJECT:==
==SUBJECT:==
REQUALIFICATION PROGRAM INSPECTION - JOSEPH M. FARLEY NUCLEAR PLANT
REQUALIFICATION PROGRAM INSPECTION - JOSEPH M. FARLEY NUCLEAR PLANT


==Dear Mrs. Gayheart:==
==Dear Mrs. Gayheart:==


In a telephone conversation on June 16, 2016, Mr. Daniel Bacon, Senior Operations Engineer, and Mr. Randy Odom, Lead Instructor for Operations Continuing Training, made arrangements for the NRC to inspect the licensed operator requalification program at the Joseph M. Farley Nuclear Plant. The inspection is planned for the weeks of July 11 and August 22, 2016, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that you have committed to maintain your plant-referenced simulator in accordance with ANSI/ANS-3.5-1985, "American National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examination."
In a telephone conversation on June 16, 2016, Mr. Daniel Bacon, Senior Operations Engineer, and Mr. Randy Odom, Lead Instructor for Operations Continuing Training, made arrangements for the NRC to inspect the licensed operator requalification program at the Joseph M. Farley Nuclear Plant. The inspection is planned for the weeks of July 11 and August 22, 2016, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that you have committed to maintain your plant-referenced simulator in accordance with ANSI/ANS-3.5-1985, American National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examination.
 
In accordance with 10 CFR 55.59, the NRC has requested that you submit by August 1, 2016, the material as specified in paragraph A of the Enclosure, in order to support the NRC's inspection program needs. The NRC has further requested that you have all items as specified in paragraph B of the Enclosure available for review for the inspectors on the first day they arrive on site. Mr. Odom has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
In accordance with 10 CFR 55.59, the NRC has requested that you submit by August 1, 2016, the material as specified in paragraph "A" of the Enclosure, in order to support the NRC's inspection program needs. The NRC has further requested that you have all items as specified in paragraph "B" of the Enclosure available for review for the inspectors on the first day they arrive on site. Mr. Odom has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.  
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on April 30, 2016.
 
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on April 30,  
 
2016.
The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
C. Gayheart 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).
C. Gayheart                                    2 The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection please contact Mr. Bacon at (404) 997-4518, (Internet E-mail:  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).
 
Thank you for your cooperation in this matter. If you have any questions regarding this inspection please contact Mr. Bacon at (404) 997-4518, (Internet E-mail:
Daniel.Bacon@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov
Daniel.Bacon@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov).
).       Sincerely,  
Sincerely,
      /RA/ Eugene F. Guthrie, Chief       Operations Branch 2       Division of Reactor Safety  
                                              /RA/
 
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-348 and 50-364 License Nos.: NPF-2 and NPF-8
Docket Nos.: 50-348 and 50-364  
 
License Nos.: NPF-2 and NPF-8


==Enclosure:==
==Enclosure:==
Materials Request List cc: Distribution via Listserv  
Materials Request List cc: Distribution via Listserv
 
_____________ SUNSI REVIEW COMPLETE    FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE DXB2 EFG      NAME BACON GUTHRIE      DATE 6/27/2016 6/28/2016 7/    /2016 7/    /2016 7/    /2016 7/    /2016 7/    /2016 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO Enclosure Materials Request List The items listed below are necessary to support the Licensed Operator Requalification Program Inspection (IP-71111.11) in July and August 2016 at the Joseph M. Farley Nuclear Plant. Items listed under "In-office inspection material" must be received in the NRC Region II office by the due dates specified below. Items listed under "On-site inspection material" should be ready for review upon arrival of the inspectors on August 22, 2016.


A. In-office inspection material:  
_____________    SUNSI REVIEW COMPLETE      FORM 665 ATTACHED OFFICE            RII:DRS        RII:DRS SIGNATURE          DXB2          EFG NAME              BACON          GUTHRIE DATE                  6/27/2016      6/28/2016    7/ /2016      7/  /2016      7/ /2016      7/ /2016    7/ /2016 E-MAIL COPY?        YES    NO    YES      NO    YES    NO      YES    NO      YES    NO    YES    NO  YES    NO Materials Request List The items listed below are necessary to support the Licensed Operator Requalification Program Inspection (IP-71111.11) in July and August 2016 at the Joseph M. Farley Nuclear Plant. Items listed under In-office inspection material must be received in the NRC Region II office by the due dates specified below. Items listed under On-site inspection material should be ready for review upon arrival of the inspectors on August 22, 2016.
: 1. List of all licensed individuals (active and inactive; RO and SRO) including license restrictions.
A.     In-office inspection material:
[August 1, 2016]  
: 1. List of all licensed individuals (active and inactive; RO and SRO) including license restrictions. [August 1, 2016]
: 2. Organizational Chart for the training department, including the simulator fidelity staff, with phone number/email contact information.  
: 2. Organizational Chart for the training department, including the simulator fidelity staff, with phone number/email contact information. [August 1, 2016]
[August 1, 2016]  
: 3. Weekly examination schedules for the weeks that the 2016 annual operating exams will be administered, including a list of personnel scheduled for testing the week of November 16, 2015. [August 1, 2016]
: 3. Weekly examination schedules for the weeks that the 2016 annual operating exams will be administered, including a list of personnel scheduled for testing the week of November 16, 2015.
: 4. All 2016 biennial written examinations that have been approved for administration, final answer keys, re-take examinations, and spreadsheets or outlines that show the usage of written examination questions on the different versions of these written examinations.
[August 1, 2016]  
[August 1, 2016]
: 4. All 2016 biennial written examinations that have been approved for administration, final answer keys, re-take examinations, and spreadsheets or outlines that show the usage of written examination questions on the different versions of these written examinations.    
: 5. Site procedure(s) governing the conduct (process and content) of license operator requalification training (classroom & simulator), examination development/administration, remedial training, and examination security. [August 1, 2016]
[August 1, 2016]  
: 6. Site procedure(s) governing simulator configuration control, maintenance, and fidelity testing methods used to fulfill ANSI/ANS 3.5-1985 requirements. [August 1, 2016]
: 5. Site procedure(s) governing the conduct (process and content) of license operator requalification training (classroom & simulator), examination development/administration, remedial training, and examination security.  
: 7. All JPMs that have been approved for administration, including spreadsheets or outlines that show the usage of the JPMs in all of the 2015 annual exam weeks. [As available on August 1, 2016 or following completion of the annual operating tests]
[August 1, 2016]  
: 8. All simulator scenarios, approved for administration that will be administered in the 2016 annual exam, including which scenarios are assigned to a specific week. [As available on August 1, 2016 or following completion of the annual operating tests]
: 6. Site procedure(s) governing simulator configuration control, maintenance, and fidelity testing methods used to fulfill ANSI/ANS 3.5-1985 requirements.  
: 9. Self-assessment reports, condition reports, and/or Licensee Event Reports, written since the last biennial requalification inspection, which document operator errors or performance problems that occurred in the actual plant/main control room, including the corrective actions. [August 1, 2016]
[August 1, 2016]  
Enclosure
: 7. All JPMs that have been approved for administration, including spreadsheets or outlines that show the usage of the JPMs in all of the 2015 annual exam weeks.  
[As available on August 1, 2016 or following completion of the annual operating tests]  
: 8. All simulator scenarios, approved for administration that will be administered in the 2016 annual exam, including which scenarios are assigned to a specific week.
[As available on August 1, 2016 or following completion of the annual operating tests]  
: 9. Self-assessment reports, condition reports, and/or Licensee Event Reports, written since the last biennial requalification inspection, which document operator errors or performance problems that occurred in the actual plant/main control room, including the  


corrective actions. [August 1, 2016]
2 B. On-site inspection material [August 22, 2016]:
2   B. On-site inspection material [August 22, 2016]:  
: 1. Requalification training attendance records for the current two year biennial training cycle.
: 1. Requalification training attendance records for the current two year biennial training cycle. 2. Examination results since last requalification inspection (weekly operating & written examinations); copies of examinations with pass/failure rates outside the average.  
: 2. Examination results since last requalification inspection (weekly operating & written examinations); copies of examinations with pass/failure rates outside the average.
: 3. Copies of the simulator scenarios for the inspectors to observe the operating crews and evaluators the week of August 22, 2016.  
: 3. Copies of the simulator scenarios for the inspectors to observe the operating crews and evaluators the week of August 22, 2016.
: 4. All remedial training documentation for any licensed operator that failed an examination since the last requalification inspection.  
: 4. All remedial training documentation for any licensed operator that failed an examination since the last requalification inspection.
: 5. List of all operators that reactivated their licenses since the last requalification inspection.  
: 5. List of all operators that reactivated their licenses since the last requalification inspection.
: 6. Records that support verification of time on shift under instruction and complete plant tours for both the reactivating operator and the supervising active license since the last requalification inspection, including:  
: 6. Records that support verification of time on shift under instruction and complete plant tours for both the reactivating operator and the supervising active license since the last requalification inspection, including:
: a. Documentation of time on shift under instruction.  
: a. Documentation of time on shift under instruction.
: b. Security system and HP/dosimetry records for plant areas toured by reactivating individual and accompanying licensed operator.  
: b. Security system and HP/dosimetry records for plant areas toured by reactivating individual and accompanying licensed operator.
: 7. Records providing documentation of maintenance of active license status (time on shift) for all licensed operators since last requalification inspection.  
: 7. Records providing documentation of maintenance of active license status (time on shift) for all licensed operators since last requalification inspection.
: 8. Medical records for all licensed (active and inactive) operators.  
: 8. Medical records for all licensed (active and inactive) operators.
: 9. Simulator maintenance and testing records, including:  
: 9. Simulator maintenance and testing records, including:
: a. List of all open simulator discrepancies  
: a. List of all open simulator discrepancies
: b. List of all simulator discrepancies closed within the past 12 months c. List of simulator performance tests  
: b. List of all simulator discrepancies closed within the past 12 months
: c. List of simulator performance tests
: d. Simulator performance testing records and associated documentation}}
: d. Simulator performance testing records and associated documentation}}

Latest revision as of 01:53, 5 February 2020

Requalification Program Inspection - Joseph M. Farley Nuclear Plant
ML16187A308
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/28/2016
From: Eugene Guthrie
NRC/RGN-II/DRS/EB2
To: Gayheart C
Southern Nuclear Operating Co
References
Download: ML16187A308 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 28, 2016 Mrs. Cheryl A. Gayheart Vice President Southern Nuclear Operating Company, Inc.

Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - JOSEPH M. FARLEY NUCLEAR PLANT

Dear Mrs. Gayheart:

In a telephone conversation on June 16, 2016, Mr. Daniel Bacon, Senior Operations Engineer, and Mr. Randy Odom, Lead Instructor for Operations Continuing Training, made arrangements for the NRC to inspect the licensed operator requalification program at the Joseph M. Farley Nuclear Plant. The inspection is planned for the weeks of July 11 and August 22, 2016, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that you have committed to maintain your plant-referenced simulator in accordance with ANSI/ANS-3.5-1985, American National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examination.

In accordance with 10 CFR 55.59, the NRC has requested that you submit by August 1, 2016, the material as specified in paragraph A of the Enclosure, in order to support the NRC's inspection program needs. The NRC has further requested that you have all items as specified in paragraph B of the Enclosure available for review for the inspectors on the first day they arrive on site. Mr. Odom has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on April 30, 2016.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

C. Gayheart 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection please contact Mr. Bacon at (404) 997-4518, (Internet E-mail:

Daniel.Bacon@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov).

Sincerely,

/RA/

Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-348 and 50-364 License Nos.: NPF-2 and NPF-8

Enclosure:

Materials Request List cc: Distribution via Listserv

_____________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE DXB2 EFG NAME BACON GUTHRIE DATE 6/27/2016 6/28/2016 7/ /2016 7/ /2016 7/ /2016 7/ /2016 7/ /2016 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Materials Request List The items listed below are necessary to support the Licensed Operator Requalification Program Inspection (IP-71111.11) in July and August 2016 at the Joseph M. Farley Nuclear Plant. Items listed under In-office inspection material must be received in the NRC Region II office by the due dates specified below. Items listed under On-site inspection material should be ready for review upon arrival of the inspectors on August 22, 2016.

A. In-office inspection material:

1. List of all licensed individuals (active and inactive; RO and SRO) including license restrictions. [August 1, 2016]
2. Organizational Chart for the training department, including the simulator fidelity staff, with phone number/email contact information. [August 1, 2016]
3. Weekly examination schedules for the weeks that the 2016 annual operating exams will be administered, including a list of personnel scheduled for testing the week of November 16, 2015. [August 1, 2016]
4. All 2016 biennial written examinations that have been approved for administration, final answer keys, re-take examinations, and spreadsheets or outlines that show the usage of written examination questions on the different versions of these written examinations.

[August 1, 2016]

5. Site procedure(s) governing the conduct (process and content) of license operator requalification training (classroom & simulator), examination development/administration, remedial training, and examination security. [August 1, 2016]
6. Site procedure(s) governing simulator configuration control, maintenance, and fidelity testing methods used to fulfill ANSI/ANS 3.5-1985 requirements. [August 1, 2016]
7. All JPMs that have been approved for administration, including spreadsheets or outlines that show the usage of the JPMs in all of the 2015 annual exam weeks. [As available on August 1, 2016 or following completion of the annual operating tests]
8. All simulator scenarios, approved for administration that will be administered in the 2016 annual exam, including which scenarios are assigned to a specific week. [As available on August 1, 2016 or following completion of the annual operating tests]
9. Self-assessment reports, condition reports, and/or Licensee Event Reports, written since the last biennial requalification inspection, which document operator errors or performance problems that occurred in the actual plant/main control room, including the corrective actions. [August 1, 2016]

Enclosure

2 B. On-site inspection material [August 22, 2016]:

1. Requalification training attendance records for the current two year biennial training cycle.
2. Examination results since last requalification inspection (weekly operating & written examinations); copies of examinations with pass/failure rates outside the average.
3. Copies of the simulator scenarios for the inspectors to observe the operating crews and evaluators the week of August 22, 2016.
4. All remedial training documentation for any licensed operator that failed an examination since the last requalification inspection.
5. List of all operators that reactivated their licenses since the last requalification inspection.
6. Records that support verification of time on shift under instruction and complete plant tours for both the reactivating operator and the supervising active license since the last requalification inspection, including:
a. Documentation of time on shift under instruction.
b. Security system and HP/dosimetry records for plant areas toured by reactivating individual and accompanying licensed operator.
7. Records providing documentation of maintenance of active license status (time on shift) for all licensed operators since last requalification inspection.
8. Medical records for all licensed (active and inactive) operators.
9. Simulator maintenance and testing records, including:
a. List of all open simulator discrepancies
b. List of all simulator discrepancies closed within the past 12 months
c. List of simulator performance tests
d. Simulator performance testing records and associated documentation