Letter Sequence Supplement |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting
Results
Other: CNL-16-008, Update on Progress of Facility Modifications for MSIV Leak Rate, CNL-18-112, Extended Power Uprate - Flow Induced Vibration Summary Report, CNL-18-124, Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Reports, CNL-18-134, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report, ML16085A301, ML16105A441, ML16168A026, ML16176A316
|
MONTHYEARML15282A2352015-09-21021 September 2015 RHR Heat Exchange K-values Utilities in EPU Containment Analyses Project stage: Request ML15282A1812015-09-21021 September 2015 Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 7 Project stage: Request ML15282A1522015-09-21021 September 2015 Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate Project stage: Request CNL-15-249, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information2015-12-15015 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information Project stage: Supplement CNL-15-250, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 72015-12-15015 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 7 Project stage: Supplement CNL-15-261, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information2015-12-18018 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information Project stage: Supplement ML16032A0442016-02-0101 February 2016 FWS to NRC, Updated List of Threatened and Endangered Species that May Occur in Your Proposed Project Location for Browns Ferry EPU Project stage: Request ML16041A3072016-02-18018 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16041A0222016-02-25025 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16040A2322016-02-25025 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16049A4632016-02-29029 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-045, Proposed Technical Specifications (Ts)Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 6, Response to Request for Additional Information2016-03-0909 March 2016 Proposed Technical Specifications (Ts)Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 6, Response to Request for Additional Information Project stage: Supplement ML16062A0722016-03-15015 March 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-048, Supplement 7, Responses to Requests for Additional Information, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU)2016-03-24024 March 2016 Supplement 7, Responses to Requests for Additional Information, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) Project stage: Supplement ML16084A3202016-03-25025 March 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-055, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 8, Response to Request for Additional Information2016-03-28028 March 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 8, Response to Request for Additional Information Project stage: Supplement ML16089A1372016-03-29029 March 2016 NRR E-mail Capture - Correction to Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16064A2862016-04-0404 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16091A0712016-04-0707 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16085A3012016-04-11011 April 2016 Regulatory Audit Plans for April 19 - 21, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other ML16085A0792016-04-14014 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16102A3392016-04-14014 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-069, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 11, Responses to Requests for Additional Information2016-04-14014 April 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 11, Responses to Requests for Additional Information Project stage: Supplement ML16104A2452016-04-20020 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-077, for Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information2016-04-27027 April 2016 for Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information Project stage: Supplement ML16105A4412016-04-27027 April 2016 Regulatory Audit Plan for May 10-11, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other CNL-16-079, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 15, Responses to Requests for Additional Information2016-05-11011 May 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 15, Responses to Requests for Additional Information Project stage: Supplement ML16124A9322016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16125A4232016-05-19019 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance CNL-16-008, Update on Progress of Facility Modifications for MSIV Leak Rate2016-05-26026 May 2016 Update on Progress of Facility Modifications for MSIV Leak Rate Project stage: Other CNL-16-091, Brown Ferry, Units 1, 2 & 3, Responses to Requests for Additional Information and Updates Associated with Interconnection System Impact Study Modifications on Proposed Technical Specifications Change TS-505 - Request for License Amendment2016-05-27027 May 2016 Brown Ferry, Units 1, 2 & 3, Responses to Requests for Additional Information and Updates Associated with Interconnection System Impact Study Modifications on Proposed Technical Specifications Change TS-505 - Request for License Amendments Project stage: Response to RAI CNL-16-094, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 20, Responses to Requests for Additional Information2016-06-0909 June 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 20, Responses to Requests for Additional Information Project stage: Supplement ML16146A6352016-06-13013 June 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16161A0642016-06-15015 June 2016 Notice of Forthcoming Closed Meeting with Tennessee Valley Authority and Its Consultant, GEH, Regarding Steam Dryers Structural Adequacy for Browns Ferry Units 1, 2 & 3 Extended Power Uprate (EPU) License Amendment Request (LAR) Project stage: Meeting CNL-16-093, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 19, Responses to Requests for Additional Information2016-06-17017 June 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 19, Responses to Requests for Additional Information Project stage: Supplement ML16154A5442016-06-21021 June 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16168A0262016-06-23023 June 2016 Summary Report for the April 19 to 21, 2016 Audit in Support of Replacement Steam Dryer Review Associated to Extended Power Uprate License Amendment Request (CAC Nos. MF6741, MF6742, and MF6743) Project stage: Other CNL-16-105, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 22, Responses to Requests for Additional Information2016-06-24024 June 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 22, Responses to Requests for Additional Information Project stage: Supplement ML16125A4062016-07-0606 July 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16127A6092016-07-0606 July 2016 NRC Letter Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16125A0842016-07-0707 July 2016 Approval for Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16130A6002016-07-0707 July 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16173A0262016-07-0707 July 2016 Approval for Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16176A3162016-07-11011 July 2016 Summary Report for the May 3 to May 5, 2016 Audit in Support Containment Accident Pressure Associated to Extended Power Uprate License Amendment Request Project stage: Other CNL-16-109, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 23, Miscellaneous Updates2016-07-13013 July 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 23, Miscellaneous Updates Project stage: Supplement CNL-16-119, Brown Ferry Nuclear Plant, Unit 1, 2 and 3 - Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information Related to Replacement Steam Dryers2016-07-13013 July 2016 Brown Ferry Nuclear Plant, Unit 1, 2 and 3 - Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information Related to Replacement Steam Dryers Project stage: Supplement ML16193A4602016-07-21021 July 2016 June 23, 2016, Summary of Closed Meeting with Tennessee Valley Authority Regarding the Structural Adequacy of Steam Dryers for Extended Power Uprate License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 (MF6741, MF6742 Project stage: Meeting ML16194A2292016-07-21021 July 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-116, Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 252016-07-27027 July 2016 Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 25 Project stage: Supplement CNL-16-118, Response to Request for Additional Information on Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 272016-07-29029 July 2016 Response to Request for Additional Information on Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 27 Project stage: Supplement 2016-04-07
[Table View] |
|
---|
Category:Letter type:CNL
MONTHYEARCNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-025, American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472023-07-0303 July 2023 American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-046, Revision to Notice of Intent to Pursue Subsequent License Renewal - Schedule Submittal2023-06-0606 June 2023 Revision to Notice of Intent to Pursue Subsequent License Renewal - Schedule Submittal CNL-23-037, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Request2023-06-0101 June 2023 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-034, 10 CFR 50.46 Annual Report2023-04-26026 April 2023 10 CFR 50.46 Annual Report CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-018, Request for Amendment Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves (BFN TS-540)2023-03-30030 March 2023 Request for Amendment Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves (BFN TS-540) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-027, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b (BFN TS-524)2023-03-29029 March 2023 Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b (BFN TS-524) CNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report CNL-23-019, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-322023-03-11011 March 2023 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-32 CNL-22-045, Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 42023-03-10010 March 2023 Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 4 CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-23-003, Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A2023-01-30030 January 2023 Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-089, License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546)2022-12-20020 December 2022 License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546) CNL-22-090, Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests for the Fifth Inservice Testing Interval2022-12-12012 December 2022 Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests for the Fifth Inservice Testing Interval CNL-22-100, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3,in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535)2022-12-0909 December 2022 to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3,in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535) CNL-22-097, Response to Request for Additional Information and Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide .2022-12-0101 December 2022 Response to Request for Additional Information and Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide . CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat2022-11-28028 November 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio CNL-22-105, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 222022-11-0808 November 2022 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 22 CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2022-10-31031 October 2022 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-22-098, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 552022-10-17017 October 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55 CNL-22-055, Application to Delete Acreage Value Discussion from Technical Specifications (BFN TS-543)2022-09-29029 September 2022 Application to Delete Acreage Value Discussion from Technical Specifications (BFN TS-543) CNL-22-096, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535)2022-09-29029 September 2022 to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535) CNL-22-083, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535).2022-09-13013 September 2022 to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535). CNL-22-075, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Unit 2, Request for Alternative, BFN-21-ISI-02, Alternative to American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section Xi,.2022-09-12012 September 2022 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Unit 2, Request for Alternative, BFN-21-ISI-02, Alternative to American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section Xi,. CNL-22-025, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-322022-08-22022 August 2022 American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-32 CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-08-11011 August 2022 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-065, Response to Request for Confirmation of Information and Additional Information and Second Supplement Regarding Application Requesting NRC Prior Approval of a Proposed Chilled-Water Cross-tie.2022-08-0101 August 2022 Response to Request for Confirmation of Information and Additional Information and Second Supplement Regarding Application Requesting NRC Prior Approval of a Proposed Chilled-Water Cross-tie. CNL-22-076, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel2022-07-28028 July 2022 to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel CNL-22-066, Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for in Support of Atrium 11 Fuel Use Supplement 3, Response to Request for Additional Information2022-07-18018 July 2022 Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for in Support of Atrium 11 Fuel Use Supplement 3, Response to Request for Additional Information CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-22-068, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-06-0808 June 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 2024-01-17
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARCNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 CNL-23-037, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Request2023-06-0101 June 2023 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests CNL-23-019, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-322023-03-11011 March 2023 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-32 CNL-22-097, Response to Request for Additional Information and Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide .2022-12-0101 December 2022 Response to Request for Additional Information and Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide . CNL-22-075, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Unit 2, Request for Alternative, BFN-21-ISI-02, Alternative to American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section Xi,.2022-09-12012 September 2022 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Unit 2, Request for Alternative, BFN-21-ISI-02, Alternative to American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section Xi,. CNL-22-065, Response to Request for Confirmation of Information and Additional Information and Second Supplement Regarding Application Requesting NRC Prior Approval of a Proposed Chilled-Water Cross-tie.2022-08-0101 August 2022 Response to Request for Confirmation of Information and Additional Information and Second Supplement Regarding Application Requesting NRC Prior Approval of a Proposed Chilled-Water Cross-tie. CNL-22-066, Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for in Support of Atrium 11 Fuel Use Supplement 3, Response to Request for Additional Information2022-07-18018 July 2022 Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for in Support of Atrium 11 Fuel Use Supplement 3, Response to Request for Additional Information CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-22-007, Supplement to Application Requesting NRC Prior Approval of a Proposed Chilled-Water Cross-tie Modification to Support System Operability (BFN-TS-518)2022-04-0606 April 2022 Supplement to Application Requesting NRC Prior Approval of a Proposed Chilled-Water Cross-tie Modification to Support System Operability (BFN-TS-518) CNL-22-028, Response to Request for Additional Information Regarding License Amendment Request Regarding Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel (TS-534)2022-03-18018 March 2022 Response to Request for Additional Information Regarding License Amendment Request Regarding Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel (TS-534) CNL-21-052, Response to Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.8.6, Battery Cell Parameters (TS-531)2021-07-21021 July 2021 Response to Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.8.6, Battery Cell Parameters (TS-531) CNL-21-033, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components2021-04-28028 April 2021 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components CNL-21-017, Response to Request for Additional Information Regarding License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into the Licensing Basis, (L-2020-LLA-0099)2020-12-29029 December 2020 Response to Request for Additional Information Regarding License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into the Licensing Basis, (L-2020-LLA-0099) CNL-20-089, Response to RAI Re Application for Tech. Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-518)2020-12-21021 December 2020 Response to RAI Re Application for Tech. Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-518) CNL-20-059, Response to Request for Additional Information Regarding Proposed Alternative Request No. 0-ISI-47 for the Third, Fifth, and Fourth 10-Year Inservice Inspection Intervals2020-08-10010 August 2020 Response to Request for Additional Information Regarding Proposed Alternative Request No. 0-ISI-47 for the Third, Fifth, and Fourth 10-Year Inservice Inspection Intervals CNL-19-122, Seismic Probabilistic Risk Assessment Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights2019-12-17017 December 2019 Seismic Probabilistic Risk Assessment Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights CNL-19-064, Response to NRC Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water...2019-08-0808 August 2019 Response to NRC Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water... CNL-19-052, Response to NRC Request for Additional Information Regarding Re-Submittal of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program and Augmented Program, Second2019-07-19019 July 2019 Response to NRC Request for Additional Information Regarding Re-Submittal of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program and Augmented Program, Second CNL-19-017, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 7, Response to Requests for Additional Information2019-01-25025 January 2019 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 7, Response to Requests for Additional Information CNL-19-007, Supplement 5, Response to Requests for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus2019-01-16016 January 2019 Supplement 5, Response to Requests for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus CNL-19-011, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 6, Additional Operator Training Results2019-01-16016 January 2019 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 6, Additional Operator Training Results CNL-18-139, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Information2018-12-14014 December 2018 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Information CNL-18-140, Response to Request for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 42018-12-13013 December 2018 Response to Request for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 4 CNL-18-117, Response to Request for Additional Information Regarding Browns Ferry Units 1, 2, and 3: Code Case N-702 for Alternative Request ISI-462018-10-17017 October 2018 Response to Request for Additional Information Regarding Browns Ferry Units 1, 2, and 3: Code Case N-702 for Alternative Request ISI-46 CNL-18-120, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant Unit 1, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program, Unit 1 Second Ten-year ..2018-10-11011 October 2018 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant Unit 1, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program, Unit 1 Second Ten-year ... ML18283A8972018-10-10010 October 2018 Enclosure 1: Proposed Changes to Browns Ferry Nuclear Plant Unit 1 Technical Specifications, Attachments 1, 2, & 3 CNL-18-089, Response to Request for Additional Information Regarding Decommissioning Funding Plan Update for Browns Ferry Nuclear Plant and Sequoyah Nuclear Plant Independent Spent Fuel Storage Installations, Docket Nos. 72-052 and 72-0342018-07-23023 July 2018 Response to Request for Additional Information Regarding Decommissioning Funding Plan Update for Browns Ferry Nuclear Plant and Sequoyah Nuclear Plant Independent Spent Fuel Storage Installations, Docket Nos. 72-052 and 72-034 CNL-18-044, Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation.2018-04-19019 April 2018 Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation. NL-18-044, Browns Ferry Units 1, 2, and 3; Sequoyah Units 1 and 2; Watts Bar Units 1 and 2 - Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Pre2018-04-19019 April 2018 Browns Ferry Units 1, 2, and 3; Sequoyah Units 1 and 2; Watts Bar Units 1 and 2 - Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Prec CNL-18-032, Tennessee Valley Authority Response to NRC Request for Additional Information (Set 2) Related to BFN Application to Revise Technical Specification 5.5.12 Primary Containment Leakage Rate Testing Program2018-03-27027 March 2018 Tennessee Valley Authority Response to NRC Request for Additional Information (Set 2) Related to BFN Application to Revise Technical Specification 5.5.12 Primary Containment Leakage Rate Testing Program CNL-18-011, Tennessee Valley Authority Response to NRC Request for Additional Information Related to BFN Application to Revise Technical Specification 5.5.12 Primary Containment Leakage Rate Testing Program (BFN-TS-497)2018-02-0505 February 2018 Tennessee Valley Authority Response to NRC Request for Additional Information Related to BFN Application to Revise Technical Specification 5.5.12 Primary Containment Leakage Rate Testing Program (BFN-TS-497) CNL-17-130, Update to Response to NRC Request for Additional Information for License Amendment Request to Revise Modifications and an Implementation Item Related to NFPA 805 Performance-Based Standard for Fire Protection For..2017-10-23023 October 2017 Update to Response to NRC Request for Additional Information for License Amendment Request to Revise Modifications and an Implementation Item Related to NFPA 805 Performance-Based Standard for Fire Protection For.. CNL-17-109, Response to NRC Request for Additional Information for License Amendment Request to Revise Modifications and an Implementation Item Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Genera2017-09-18018 September 2017 Response to NRC Request for Additional Information for License Amendment Request to Revise Modifications and an Implementation Item Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generati CNL-17-098, Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels2017-07-27027 July 2017 Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels CNL-17-085, Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels2017-07-0707 July 2017 Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels CNL-17-039, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident - Withdrawal of Regulatory..2017-03-10010 March 2017 Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident - Withdrawal of Regulatory.. CNL-17-035, Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate(Epu) - Supplement 38, Spent Fuel Pool Criticality Safety Analysis - Updated Information2017-03-0303 March 2017 Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate(Epu) - Supplement 38, Spent Fuel Pool Criticality Safety Analysis - Updated Information CNL-17-017, Proposed Technical Specifications (TS) Change TS-505 Request for License Amendments - Extended Power Uprate (EPU) - Supplement 37, Transmission System Update - Environmental Aspects2017-02-0303 February 2017 Proposed Technical Specifications (TS) Change TS-505 Request for License Amendments - Extended Power Uprate (EPU) - Supplement 37, Transmission System Update - Environmental Aspects CNL-17-015, Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 36, Transmission System Update -Safety Aspects2017-01-20020 January 2017 Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 36, Transmission System Update -Safety Aspects NL-17-015, Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 36, Transmission System Update -Saf2017-01-20020 January 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 36, Transmission System Update -Safe CNL-16-196, Revised Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2016-12-19019 December 2016 Revised Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools CNL-16-161, Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 33, Revised Response to Request for Additional..2016-10-13013 October 2016 Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 33, Revised Response to Request for Additional.. CNL-16-145, Revised Responses to Requests for Additional Information Regarding Proposed Technical Specifications Change TS-505 - Extended Power Uprate - Supplement 302016-09-23023 September 2016 Revised Responses to Requests for Additional Information Regarding Proposed Technical Specifications Change TS-505 - Extended Power Uprate - Supplement 30 CNL-16-150, Revised Response to Requests for Additional Information Proposed Technical Specifications Change TS-505 - Request for License Amendment - Extended Power Uprate - Supplement 312016-09-21021 September 2016 Revised Response to Requests for Additional Information Proposed Technical Specifications Change TS-505 - Request for License Amendment - Extended Power Uprate - Supplement 31 CNL-16-133, Response to NRC Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486) (CAC Nos. MF6738, MF6739, and MF6740) - Letter 72016-09-15015 September 2016 Response to NRC Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486) (CAC Nos. MF6738, MF6739, and MF6740) - Letter 7 CNL-16-152, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 32, Revised Responses to Requests for Additional Information2016-09-12012 September 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 32, Revised Responses to Requests for Additional Information CNL-16-126, Response to NRC Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486)2016-08-24024 August 2016 Response to NRC Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486) CNL-16-129, Response to Request for Additional Information Regarding Proposed Technical Specifications (TS) Change TS-505 License Amendments - Extended Power Uprate (EPU) - Supplement 292016-08-0303 August 2016 Response to Request for Additional Information Regarding Proposed Technical Specifications (TS) Change TS-505 License Amendments - Extended Power Uprate (EPU) - Supplement 29 CNL-16-127, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Upgrade (EPU) - Supplement 28, Responses to Requests for Additional Information2016-08-0303 August 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Upgrade (EPU) - Supplement 28, Responses to Requests for Additional Information CNL-16-114, Responses to Requests for Additional Information and Containment Accident Pressure Credit Elimination Updates on Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate .2016-08-0303 August 2016 Responses to Requests for Additional Information and Containment Accident Pressure Credit Elimination Updates on Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate . 2024-01-11
[Table view] |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-16-118 July 29, 2016 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 27, Response to Requests for Additional Information
References:
- 1. Letter from TVA to NRC, CNL-15-169, "Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU)," dated September 21, 2015 (ML15282A152)
- 2. Letter from NRC to TVA, Browns Ferry Nuclear Plant, Units 1, 2, and 3 -
Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate (CAC Nos. MF6741, MF6742, and MF6743), dated July 21, 2016 (ML16187A293)
- 3. Letter from TVA to NRC, CNL-16-091, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 18, Responses to Requests for Additional Information and Updates Associated with Interconnection System Impact Study Modifications, dated May 27, 2016 (ML16197A563)
By the Reference 1 letter, Tennessee Valley Authority (TVA) submitted a license amendment request (LAR) for the Extended Power Uprate (EPU) of Browns Ferry Nuclear Plant (BFN) Units 1, 2 and 3. The proposed LAR modifies the renewed operating licenses to increase the maximum authorized core thermal power level from the current licensed thermal power of 3458 megawatts to 3952 megawatts. During the technical review of the LAR, the Nuclear Regulatory Commission (NRC) identified the need for additional information. The Reference 2 letter provided an NRC Request for Additional Information (RAI) related to dose analyses. The due date for the response to NRC RAI ARCB-DA-RAI 1.1, provided by the Reference 2 letter, is July 29, 2016. to this letter provides the response to NRC RAI ARCB-DA-RAI 1.1.
U.S. Nuclear Regulatory Commission CNL-16-118 Page 2 July 29, 2016 to this letter provides Revision 2 to the BFN EPU List and Status of Plant Modifications. The BFN EPU List and Status of Modifications is revised to reflect the response to NRC RAI ARCB-DA-1.1. Enclosure 2 supersedes and replaces Revision 1 of 7 of the BFN EPU LAR (Enclosure 10 of Reference 3) , dated May 27, 2016.
TVA has reviewed the information supporting a finding of no significant hazards consideration and the environmental consideration provided to the NRC in the Reference 1 letter. The supplemental information provided in this submittal does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration . In addition, the supplemental information in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed license amendment.
Additionally, in accordance with 10 CFR 50.91 (b)(1 ), TVA is sending a copy of this letter to the Alabama State Department of Public Health .
There are no new regulatory commitments associated with this submittal. If there are any questions or if additional information is needed, please contact Edward D. Schrull at (423) 751-3850.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 29th day of July 2016.
RJicttull(L J. :~~
Vice President, Nuclear Licensing
Enclosures:
- 1. Response to NRC Request for Additional Information ARCB-DA-RAI 1.1
- 2. BFN EPU LAR Attachment 47, List and Status of Plant Modifications, Revision 2 cc:
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant State Health Officer, Alabama Department of Public Health
ENCLOSURE 1 Response to NRC Request for Additional Information ARCB-DA-RAI 1.1
ENCLOSURE 1 ARCB-DA-RAI 1.1 In Section 2.9.2, Radiological Consequences Analyses Using Alternative Source Terms, of Attachments 6 and 7, Safety Analysis Report for Browns Ferry Nuclear Plant Units,1, 2, and 3 Extended Power Uprate, of the extended power uprate (EPU) LAR dated September 21, 2015, TVA stated, in part, that the effect of the proposed EPU on the radiological consequences of the loss-of-coolant accident (LOCA), fuel handling accident, control rod drop accident, and the main steamline break accident is based on an assessment of the effect of EPU changes on the dose consequence analyses that were evaluated by the NRC in the safety evaluation for the Browns Ferry AST License Amendments 251, 290, and 249, which approved a full-scope implementation of an AST that complies with the guidance given in RG 1.183 and 10 CFR 50.67.
By letter dated March 9, 2016 (ADAMS Accession No. ML16070A189), TVA responded to the RAIs associated with dose analysis. Specifically, the staff in ARCB DA RAI 1 asked that the licensee provide the current licensing basis (CLB) and the revised EPU input values, assumptions, and methods, as well as a justification for any changes to the CLB. The NRC also requested that the licensee identify which of these parameters were not previously reviewed and approved by the NRC and provide a justification for the change from the previously reviewed values to the CLB. TVA, in its response dated March 9, 2016, supplemented the above information with additional information regarding updates to the LOCA analyses. TVA in the RAI response stated, in part, that The LOCA analysis was subsequently [after approval of the AST] revised and approved in the license amendments issued for Technical Specification (TS) Change Request TS-474 [Amendment Nos. 282, 308 and 267 for Units 1, 2 and 3, respectively].
In the RAI response TVA did not discuss information regarding a non-conforming/degraded condition that impacts the design configuration and accident response reviewed and approved in the Amendment Nos. 251/282 (Unit 1), 290/308 (Unit 2) and 249/267 (Unit 3). However, in a letter dated May 26, 2016 (ADAMS Accession No. ML16148A108), TVA stated that it is expected to resolve the nonconforming/degraded condition during Refueling Outage 18 in Fall 2018 (Unit 1), Refueling Outage 20 in Spring 2019 (Unit 2), and Refueling Outage 18 in Spring 2018 (Unit 3).
E1-1
ENCLOSURE 1 TVA proposes to use the approval of Amendments 251/282 (Unit 1), 290/308 (Unit 2) and 249/267 (Unit 3) to justify the dose analysis at the EPU condition, but the design configuration and accident response assumed in these amendments does not exist due to a non-conforming/degraded condition. In order to determine that there is reasonable assurance that the acceptance criteria for the radiological consequences analyses for 10 CFR 50.67 and GDC 19 are met, the NRC staff asks TVA to provide either:
- 1. A license condition to "perform facility and licensing basis modifications such that the current licensing basis dose calculations would remain valid" prior to the implementation of the EPU, Or
- 2. Provide the following information.
- a. Since the withdrawal of the LAR on May 29, 2015, what changes were made to the compensatory measures (including the dose analysis submitted to the NRC) to address the NRCs concerns with the LAR (as discussed in the March 18, 2015 meeting)?
- b. Explain how the compensatory measures, discussed above, restored all applicable structures systems and components to operability/functionality such that they can perform their desired safety function.
- c. With a nonconforming/degraded condition in the primary ALT flow path (that may not function during a LOCA due to valve(s) closing that may not be reopened) and considering a single failure in the secondary ALT flow path how are the safety functions of these ALT flow paths ensured?
TVA Response:
As part of the Extended Power Uprate License Amendments, Browns Ferry Nuclear Plant will accept license conditions for resolution of the Alternate Leakage Treatment pathway non-conforming/degraded condition worded as follows.
TVA shall perform facility and licensing basis modifications to resolve the non-conforming/degraded condition associated with the Alternate Leakage Treatment pathway such that the current licensing basis dose calculations (approved in License Amendment Nos. [251/282 (Unit 1), 290/308 (Unit 2) and 249/267 (Unit 3)]) would remain valid. These facility and licensing basis modifications shall be complete prior to initial power ascension above 3458 MWt.
E1-2
ENCLOSURE 2 BFN EPU LAR Attachment 47, List and Status of Plant Modifications, Revision 2
Browns Ferry Units 1, 2 and 3 EPU Modifications, Revision 2 The modifications required to support Extended Power Uprate (EPU) for Browns Ferry Nuclear Power Station (BFN) Units 1, 2 and 3 are shown in Table 1. The modifications reported as Complete in Table 1 are fully implemented, for all other modifications, a schedule for full implementation is provided. All EPU modifications, either completed or being prepared, are in accordance with the TVA Plant Modifications and Engineering Change Control process.
Further evaluations may identify the need for additional modifications or obviate the need for some modifications. As such, Table 1 listings are not a formal commitment to implement the modifications exactly as described or per the proposed schedule.
Additionally, various minor modifications and adjustments to plant equipment, which may be necessary, are not listed.
Att 47-1
Table 1: BFN EPU Planned Modifications and Current Schedule Scheduled Modification Description Completion (Note 1)
Replacement New steam dryers will be installed with increased structural design margin Unit 1 - Fall 2018 Steam Dryer to accommodate EPU operation. Unit 2 - Spring 2019 Replacement steam dryers are curved hood six-bank dryers analyzed Unit 3 - Spring 2018 for fatigue resulting from flow induced vibration and hydrodynamic loads.
Main steam line strain gages were previously installed to obtain measurements at CLTP conditions which were used to design the replacement steam dryers.
New main steam line strain gages will be installed to replace the existing strain gages which have reached end of life to obtain measurements during power ascension testing of the replacement steam dryers.
Main Turbine Replace the High Pressure Turbine rotor. Incorporate GE's Advanced Design Steam Path which is designed for the increased flow associated with EPU.
Unit 1 - Fall 2018 Replace High Pressure Turbine diaphragms and rotor buckets. Unit 2 - Spring 2019 Unit 3 - Spring 2018 Modify the cross around relief valves (CARVs) to permit increased set Unit 1 - Complete pressure. Unit 2 - Complete Unit 3 - Complete Replace and/or recalibrate Main Steam system flow and pressure Unit 1 - Complete instruments. Unit 2 - Complete Unit 3 - Complete Turbine Sealing Increase the size of the Steam Packing Unloader Valves (SPUVs) and Unit 1 - Complete Steam associated piping to enable the turbine sealing system to accommodate Unit 2 - Complete EPU flow requirements. Unit 3 - Complete Increase SPUVs and piping from 8-inch to 10-inch components.
Replace and rescale steam flow and steam pressure transmitters.
Att 47-2
Scheduled Modification Description Completion (Note 1)
Condensate Upgrade Condensate pumps with new impellers and motors to Unit 1 - Complete Pumps accommodate the increased flows that will be required for EPU operation. Unit 2 - Complete Replace impellers in each pump (3 pumps per Unit). Unit 3 - Complete Replace 900 HP motors with 1250 HP motors.
Add orifice plate to the Condensate Recirculation line to reduce pressure drop across the flow control valve to minimize cavitation and vibration.
Replace existing pump discharge check valves with different style check valves having lower pressure drop and better transient response.
Replace pump suction strainers with stronger mesh screen to prevent screen deformation with the increased EPU flow conditions.
Change motor protection relay settings.
Recalibrate/replace pump and motor instrumentation.
Condensate Replace the Condensate Booster (CB) pumps and motors to increase Unit 1 - Complete Booster Pumps pump capacity to accommodate the increased flows that will be required Unit 2 - Complete for EPU operation. Unit 3 - Complete Replace CB pumps with higher capacity pumps.
Replace air-cooled 1750 HP motors with water-cooled 3000 HP motors.
Replace existing pump discharge check valves with different style check valves having lower pressure drop and better transient response.
Change motor protection relay settings.
Recalibrate/replace pump and motor instrumentation.
Condensate Pump Provide additional cooling/ventilation in vicinity of the Condensate and Unit 1 - Complete and Condensate Condensate Booster pumps to accommodate the increased heat load Unit 2 - Complete Booster Pump resulting from larger air-cooled Condensate Pump motors and supplement Unit 3 - Complete Area Ventilation cooling requirements for the hydrogen water chemistry (HWC) main control panel.
Replace 3-position switches for operation of the Air Handling Units (AHUs) with 4-position switches that will allow parallel operation of the AHUs.
Addition of a balancing damper to the Condensate Pump motors to provide better balancing of air flow.
Addition of a branch duct and balancing damper to the HWC main control panel.
Att 47-3
Scheduled Modification Description Completion (Note 1)
Feedwater Pumps Upgrade the Feedwater system to provide increased Feedwater flow for and Turbines EPU operation.
Replace pumps with higher capacity pumps. Unit 1 - Complete Replace turbine rotor, diaphragms and buckets. Unit 2 - Complete Replace turbine/pump coupling. Unit 3 - Complete Upgrade seal water injection subsystem.
Update Feedwater control system software for EPU conditions. Unit 1 - Fall 2018 Unit 2 - Spring 2019 Unit 3 - Spring 2018 Moisture Modify the internals of the moisture separators to increase moisture Unit 1 - Complete Separators removal and accommodate increased flows at EPU conditions. Unit 2 - Complete Change vanes and added perforated plate on moisture separators. Unit 3 - Complete Modify internal drains as needed.
Feedwater Upgrade Feedwater Heaters to support EPU operating conditions.
Heaters Unit 1 - Complete Re-rate the number 1, 2 and 3 Feedwater Heater shells to meet higher Unit 2 - Complete pressures, temperatures and flows under EPU conditions by Unit 3 - Spring 2018 modification of selected nozzles and replacement of shell relief valves to meet ASME code requirements.
Replace level control instrumentation on the number 1, 2 and 3 Feedwater Heaters to reduce susceptibility to flow induced turbulence (pressure transients).
Provide additional welds and bracing to the pass partition plates for Unit 1 - Complete Nos. 1, 2, 3, and 5 Feedwater Heaters. (Number 4 Feedwater Unit 2 - Complete Heaters pass partition plates will be addressed with replacement of Unit 3 - Complete the tube bundle and channel head.)
Due to the increase in tube-side design pressure with the increase Unit 1 - Complete head capacity of the Condensate Booster pumps, replace channel Unit 2 - Complete head relief valves for No. 3 Feedwater Heaters with valves having Unit 3 - Spring 2018 higher setpoints, and install a reinforcement ring on the manways for the number 3 and number 5 Feedwater Heaters.
On each of the number 3 Feedwater Heaters, replace the upper shell Unit 1 - Complete and install an extraction steam inlet duct to minimize heater shell Unit 2 - Spring 2017 erosion and preclude tube damage from steam jet impingement. Unit 3 - Complete Replace tube bundle and channel head in the number 4 Feedwater Unit 1 - Fall 2018 Heaters with a design less susceptible to damage from flow induced Unit 2 - Spring 2019 vibration. Unit 3 - Spring 2018 Main Condenser Replace Main Condenser Extraction Steam bellows #2, #3, #4 and #5 with Unit 1 - Complete Extraction Steam bellows accommodating higher design temperatures and pressures for Unit 2 - Complete Bellows EPU. Unit 3 - Complete Att 47-4
Scheduled Modification Description Completion (Note 1)
Condensate Install a 10th condensate demineralizer (and associated valves and Unit 1 - Complete Demineralizers controls) on each unit to accommodate the increased condensate flow Unit 2 - Complete associated with EPU operation.
Unit 3 - Complete Steam Packing Increase the capacity of the steam packing exhauster bypass line to Unit 1 - Complete Exhauster Bypass accommodate increased flow under EPU conditions. Unit 2 - Complete Install larger piping and flow control valve. Unit 3 - Complete Torus Attached Modification to reinforce an existing pad at an ECCS ring header branch Unit 1 - N/A Piping connection to address higher pipe stresses associated with EPU Unit 2 - Complete conditions. Required only on Units 2 and 3 as sufficient stress margin Unit 3 - Complete exists on Unit 1.
Main Steam Modify one Unit 2 Main Steam pipe support due to increased loads Unit 1 - NA Supports resulting from turbine stop valve closure at EPU steam flow rates. All other Unit 2 - Complete existing Unit 2 Main Steam pipe supports, and all Main Steam pipe Unit 3 - NA supports on Units 1 and 3, were determined to have sufficient design margin to accommodate the increased turbine stop valve closure loads.
Reactor Upgrade the reactor recirculation system for EPU core flow operating Recirculation conditions.
Pumps & Motors Perform analyses/evaluations to increase the design ratings for the Unit 1 - Complete recirculation pumps and motors. Unit 2 - Complete Upgrade the Variable Frequency Drive (VFD) control system. Unit 3 - Complete Perform pump and motor instrumentation upgrades - jet pump head, RCW flow, motor winding temperatures, VFD protective relay settings.
Revise Upper Power Runback setting for EPU conditions. Unit 1 - Fall 2018 Unit 2 - Spring 2019 Unit 3 - Spring 2018 Jet Pump Sensing Install jet pump sensing line clamps to reduce pipe vibration under EPU Unit 1 - Complete Line Clamps conditions. Unit 2 - Complete Unit 3 - Complete Main Generator Uprate main generator to 1330 MVA (Unit 1) / 1332 MVA (Units 2 & 3). Unit 1 - Complete System Install rewound stator to support higher generator output capacity. Unit 2 - Spring 2019 Unit 3 - Complete Replace/modify stator water cooling (SWC) instruments and change SWC flow, pressure, DP and temperature settings to support increased stator water cooling requirements.
Main Generator Increase generator hydrogen pressure from 65 psig to 75 psig to support Unit 1 - Fall 2018 Hydrogen EPU operation. Unit 2 - Spring 2019 Pressure Change pressure regulating valve settings and pressure alarm setting. Unit 3 - Spring 2018 Replace pressure switches as needed for new operating range.
Change generator field over-excitation relay settings.
Eliminate hydrogen flow integrator to mitigate hydrogen leakage.
Att 47-5
Scheduled Modification Description Completion (Note 1)
Isophase Bus Duct Modify isophase bus duct cooling system to remove increased bus duct Unit 1 - Complete Cooling heat under EPU conditions. Unit 2 - Complete Replace cooling fans and motors. Unit 3 - Complete Replace cooling coils.
Main Bank Upgrade main bank transformers to account for the higher power output Unit 1 - Complete Transformers from the main generators at EPU conditions. Unit 2 - Complete Replace three 500 MVA transformers per unit. Unit 3 - Installation Replace one Units 1 and 2 500 MVA spare transformer. complete, post-Install new dedicated Unit 3 500 MVA spare transformer. modification testing of the Unit 3 Spare Transformer pending Vibration Install mounting brackets/supports and temporary instrumentation for Unit 1 - Fall 2018 Monitoring vibration monitoring during EPU power ascension in accordance with Unit 2 - Spring 2019 Attachment 45 (Flow Induced Vibration Analysis and Monitoring Program).
Unit 3 - Spring 2018 Main Steam Modify MSIVs to support steam flow increase at EPU conditions. Unit 1 - Complete Isolation Valves Install longer stroke actuators to move the poppet further out of the Unit 2 - Complete (MSIV) flow stream. This modification reduced valve pressure drop to Unit 3 - Complete accommodate EPU conditions.
Perform additional modifications to improve performance of the MSIVs including new bonnets, nose guided poppets (trimmed profile), and larger diameter valve stems.
Electro-Hydraulic Revise EHC software to address changes in plant parameters required to Unit 1 - Complete Control (EHC) support EPU.
Unit 2 - Complete Software Electrical Overspeed set point, Intermediate Pressure, Power Load Unbalance, Turbine First Stage Pressure, and Megawatt (MW) Control Unit 3 - Complete Technical Technical Specification Instrument respan and setpoint changes for EPU Unit 1 - Fall 2018 Specification Turbine 1st stage pressure scram bypass permissive setpoint change Unit 2 - Spring 2019 Instrument Main steam line high flow isolation channel respan Unit 3 - Spring 2018 Respan APRM flow biased and setdown instrument respan and setpoint change Balance of Plant Respan balance of plant (BOP) instruments for EPU. Unit 1 - Complete Instrument Update hydrogen water chemistry programmable logic controller (PLC) Unit 2 - Complete Respan software for control of hydrogen and oxygen injection at EPU. Unit 3 - Complete Replace and respan hydrogen water chemistry flow instruments.
Replace and respan extraction steam pressure instruments.
Replace and respan feedwater heater pressure and level instruments.
Recalibrate setpoints for reactor feedwater low suction and steam jet air ejector stage I/II/III low pressure switches.
Respan high pressure turbine exhaust intermediate pressure.
Replace and respan offgas condenser cooling water temperature instruments.
Att 47-6
Scheduled Modification Description Completion (Note 1)
Condenser Upgrade condenser instrumentation for improved reliability and Instrumentation performance monitoring under EPU conditions.
Replace/relocate condenser A/B/C hotwell pressure transmitters to Unit 1 - Complete improve inputs to the integrated computer system (ICS).
Add condenser circulating water (CCW) inlet/outlet temperature inputs Unit 2 - Complete to the integrated computer system (ICS). Unit 3 - Complete Respan condenser A/B/C CCW outlet flow channels and add to ICS.
Revise reactor feed pump turbine (RFPT) trip to two out of three logic.
Modify Steam jet air ejector (SJAE) to remove the trip on low condenser vacuum and eliminate auto-start of standby SJAE.
Install nine new condenser vacuum pressure transmitters per unit (3 on each condenser) and provide signals to electro-hydraulic control Unit 1 - Fall 2018 (EHC) system. Unit 2 - Spring 2019 Move condenser A/B/C low vacuum alarm, low vacuum turbine trip Unit 3 - Spring 2018 and low vacuum bypass trip functions to EHC logic (previously performed by pressure switches).
Perform hardware and software changes to EHC system to support new alarm and trip functions.
Steam Jet Air Revise setpoints for SJAE condensate pressure switches to prevent Unit 1 - Complete Ejector (SJAE) inadvertent SJAE isolation. Unit 2 - Complete Pressure switches Unit 3 - Complete Main Steam Install Acoustic Vibration Suppressors (AVS) inside the Main Steam 6" Unit 1 - Complete Acoustic Vibration diameter blind flanged branch lines to reduce acoustic loading on the Unit 2 - Complete Suppressors steam dryer.
Unit 3 - Complete Standby Liquid The shutdown capability of the SLC system is being increased to support Unit 1 - Fall 2018 Control (SLC) the Containment Accident Pressure Credit Elimination during an ATWS Unit 2 - Spring 2019 System event as discussed in PUSAR Section 2.8.4.5.3 (Attachment 6) by Unit 3 - Spring 2018 increasing the Boron-10 enrichment.
Emergency High As part of the transition to National Fire Protection Association Standard Unit 1 - Fall 2016 Pressure Makeup (NFPA) 805, BFN is installing a non-safety related emergency high Unit 2 - Spring 2017 Pump pressure pump in each unit to provide makeup from the Condensate Unit 3 - Spring 2018 Storage Tank to the Reactor Pressure Vessel. This modification is not required for EPU operation but is addressed in PUSAR Section 2.6.5.2 (Attachment 6), Containment Accident Pressure (CAP) Elimination.
Although not needed for CAP Credit Elimination, use of the makeup pump will provide additional NPSH margin during the Fire Event.
Att 47-7
Scheduled Completion Modification Description (Note 1)
Emergency High As part of the transition to National Fire Protection Association Unit 1 - Fall 2016 Pressure Makeup Standard (NFPA) 805, BFN is installing a non-safety related Unit 2 - Spring 2017 Pump emergency high pressure pump in each unit to provide makeup from Unit 3 - Spring 2018 the Condensate Storage Tank to the Reactor Pressure Vessel. This modification is not required for EPU operation but is addressed in PUSAR Section 2.6.5.2 (Attachment 6), Containment Accident Pressure (CAP) Elimination. Although not needed for CAP Credit Elimination, use of the makeup pump will provide additional NPSH margin during the Fire Event.
Hardened Wetwell In response to EA-13-109, Order Modifying Licenses with Regard to Unit 1 - Fall 2016 Vent Reliable Hardened Containment Vents Capable of Operation Under Unit 2 - Spring 2017 Severe Accident Conditions, the Hardened Wetwell Vent (HWWV) Unit 3 - Spring 2018 will be modified to provide individual vent lines for each BFN unit.
As discussed in PUSAR Section 2.6.1.4 (Attachment 6), the existing HWWV capacity would be reduced to 0.88% of rated thermal power under EPU conditions. However, with the implementation of this modification in response to EA-13-109, the capacity of the HWWV will be restored to 1% of EPU thermal power.
Static Excitation As a result of the increased electrical generation at EPU, the Unit 1 - Fall 2020 System Excitation System on Units 1, 2, and 3 will be upgraded by installing Unit 2 - Spring 2023 a Static Excitation System. The system will include a dual channel Unit 3 - Spring 2024 digital automatic voltage regulator (AVR) for complete redundancy, with each channel consisting of an auto and manual back-up mode.
(See also Note 2 below.)
Alternate Leakage Provide a highly reliable Alternate Leakage Treatment Pathway that Unit 1 - Fall 2018 Treatment routes 99.5% of the leakage from the primary containment MSIVs Unit 2 - Spring 2019 Pathway directly to the condenser. The modification on each unit will include Unit 3 - Spring 2018 replacement of five motor operated valves on the Main Steam drain lines with air operated valves. Also, an additional Main Steam drain line valve will be installed, with an air operator, to address single failure criteria. All the new air operated valves will fail open on loss of electrical power or control air.
Notes:
- 1) The expected completion timeframes reported in Table 1 correspond to the following refuel outages: For BFN Unit 1, Fall of 2016 is RFO-U1R11, Fall of 2018 is RFO-U1R12 and Fall 2020 is RFO-U1R13. For BFN Unit 2, Spring of 2017 is RFO-U2R19, Spring of 2019 is RFO-U2R20 and Spring 2023 is RFO-U2R22. For BFN Unit 3, Spring of 2018 is RFO-U3R18 and Spring 2024 is RFO-U3R21.
- 2) The Static Excitation System is not required to be installed prior to EPU operation. During the interim period of EPU operation preceding installation of the Static Excitation System, transmission system grid stability will be maintained through use of a detailed temporary operating guide.
Att 47-8