Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting
Results
Other: CNL-16-008, Update on Progress of Facility Modifications for MSIV Leak Rate, CNL-18-112, Extended Power Uprate - Flow Induced Vibration Summary Report, CNL-18-124, Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Reports, CNL-18-134, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report, ML16085A301, ML16105A441, ML16168A026, ML16176A316
|
MONTHYEARML15282A2352015-09-21021 September 2015 RHR Heat Exchange K-values Utilities in EPU Containment Analyses Project stage: Request ML15282A1812015-09-21021 September 2015 Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 7 Project stage: Request ML15282A1522015-09-21021 September 2015 Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate Project stage: Request CNL-15-249, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information2015-12-15015 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information Project stage: Supplement CNL-15-250, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 72015-12-15015 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 7 Project stage: Supplement CNL-15-261, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information2015-12-18018 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information Project stage: Supplement ML16032A0442016-02-0101 February 2016 FWS to NRC, Updated List of Threatened and Endangered Species that May Occur in Your Proposed Project Location for Browns Ferry EPU Project stage: Request ML16041A3072016-02-18018 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16041A0222016-02-25025 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16040A2322016-02-25025 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16049A4632016-02-29029 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-045, Proposed Technical Specifications (Ts)Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 6, Response to Request for Additional Information2016-03-0909 March 2016 Proposed Technical Specifications (Ts)Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 6, Response to Request for Additional Information Project stage: Supplement ML16062A0722016-03-15015 March 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-048, Supplement 7, Responses to Requests for Additional Information, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU)2016-03-24024 March 2016 Supplement 7, Responses to Requests for Additional Information, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) Project stage: Supplement ML16084A3202016-03-25025 March 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-055, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 8, Response to Request for Additional Information2016-03-28028 March 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 8, Response to Request for Additional Information Project stage: Supplement ML16089A1372016-03-29029 March 2016 NRR E-mail Capture - Correction to Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16064A2862016-04-0404 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16091A0712016-04-0707 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16085A3012016-04-11011 April 2016 Regulatory Audit Plans for April 19 - 21, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other ML16085A0792016-04-14014 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16102A3392016-04-14014 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-069, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 11, Responses to Requests for Additional Information2016-04-14014 April 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 11, Responses to Requests for Additional Information Project stage: Supplement ML16104A2452016-04-20020 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-077, for Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information2016-04-27027 April 2016 for Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information Project stage: Supplement ML16105A4412016-04-27027 April 2016 Regulatory Audit Plan for May 10-11, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other CNL-16-079, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 15, Responses to Requests for Additional Information2016-05-11011 May 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 15, Responses to Requests for Additional Information Project stage: Supplement ML16124A9322016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16125A4232016-05-19019 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance CNL-16-008, Update on Progress of Facility Modifications for MSIV Leak Rate2016-05-26026 May 2016 Update on Progress of Facility Modifications for MSIV Leak Rate Project stage: Other CNL-16-091, Brown Ferry, Units 1, 2 & 3, Responses to Requests for Additional Information and Updates Associated with Interconnection System Impact Study Modifications on Proposed Technical Specifications Change TS-505 - Request for License Amendment2016-05-27027 May 2016 Brown Ferry, Units 1, 2 & 3, Responses to Requests for Additional Information and Updates Associated with Interconnection System Impact Study Modifications on Proposed Technical Specifications Change TS-505 - Request for License Amendments Project stage: Response to RAI CNL-16-094, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 20, Responses to Requests for Additional Information2016-06-0909 June 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 20, Responses to Requests for Additional Information Project stage: Supplement ML16146A6352016-06-13013 June 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16161A0642016-06-15015 June 2016 Notice of Forthcoming Closed Meeting with Tennessee Valley Authority and Its Consultant, GEH, Regarding Steam Dryers Structural Adequacy for Browns Ferry Units 1, 2 & 3 Extended Power Uprate (EPU) License Amendment Request (LAR) Project stage: Meeting CNL-16-093, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 19, Responses to Requests for Additional Information2016-06-17017 June 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 19, Responses to Requests for Additional Information Project stage: Supplement ML16154A5442016-06-21021 June 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16168A0262016-06-23023 June 2016 Summary Report for the April 19 to 21, 2016 Audit in Support of Replacement Steam Dryer Review Associated to Extended Power Uprate License Amendment Request (CAC Nos. MF6741, MF6742, and MF6743) Project stage: Other CNL-16-105, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 22, Responses to Requests for Additional Information2016-06-24024 June 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 22, Responses to Requests for Additional Information Project stage: Supplement ML16125A4062016-07-0606 July 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16127A6092016-07-0606 July 2016 NRC Letter Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16125A0842016-07-0707 July 2016 Approval for Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16130A6002016-07-0707 July 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16173A0262016-07-0707 July 2016 Approval for Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16176A3162016-07-11011 July 2016 Summary Report for the May 3 to May 5, 2016 Audit in Support Containment Accident Pressure Associated to Extended Power Uprate License Amendment Request Project stage: Other CNL-16-109, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 23, Miscellaneous Updates2016-07-13013 July 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 23, Miscellaneous Updates Project stage: Supplement CNL-16-119, Brown Ferry Nuclear Plant, Unit 1, 2 and 3 - Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information Related to Replacement Steam Dryers2016-07-13013 July 2016 Brown Ferry Nuclear Plant, Unit 1, 2 and 3 - Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information Related to Replacement Steam Dryers Project stage: Supplement ML16193A4602016-07-21021 July 2016 June 23, 2016, Summary of Closed Meeting with Tennessee Valley Authority Regarding the Structural Adequacy of Steam Dryers for Extended Power Uprate License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 (MF6741, MF6742 Project stage: Meeting ML16194A2292016-07-21021 July 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-116, Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 252016-07-27027 July 2016 Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 25 Project stage: Supplement CNL-16-118, Response to Request for Additional Information on Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 272016-07-29029 July 2016 Response to Request for Additional Information on Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 27 Project stage: Supplement 2016-04-07
[Table View] |
|
---|
Category:Letter type:CNL
MONTHYEARCNL-24-043, Application for Subsequent Renewed Operating Licenses, Second Safety Supplement2024-11-0101 November 2024 Application for Subsequent Renewed Operating Licenses, Second Safety Supplement CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-036, – 10 CFR 50.46 Annual Report2024-04-25025 April 2024 – 10 CFR 50.46 Annual Report CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-013, Cycle 22 Reload Analysis Report2024-03-14014 March 2024 Cycle 22 Reload Analysis Report CNL-24-026, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-14014 March 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-24-029, Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 372024-03-14014 March 2024 Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 37 CNL-24-023, Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 252024-02-20020 February 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 25 CNL-24-011, Application for Subsequent Renewed Operating Licenses, Supplemental Information - Neutron Fluence Analyses Methodology2024-01-22022 January 2024 Application for Subsequent Renewed Operating Licenses, Supplemental Information - Neutron Fluence Analyses Methodology CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-025, American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472023-07-0303 July 2023 American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-046, Revision to Notice of Intent to Pursue Subsequent License Renewal - Schedule Submittal2023-06-0606 June 2023 Revision to Notice of Intent to Pursue Subsequent License Renewal - Schedule Submittal CNL-23-037, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Request2023-06-0101 June 2023 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-034, 10 CFR 50.46 Annual Report2023-04-26026 April 2023 10 CFR 50.46 Annual Report CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-018, – Request for Amendment Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves (BFN TS-540)2023-03-30030 March 2023 – Request for Amendment Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves (BFN TS-540) CNL-23-027, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b (BFN TS-524)2023-03-29029 March 2023 Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b (BFN TS-524) CNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report CNL-23-019, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-322023-03-11011 March 2023 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-32 CNL-22-045, Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 42023-03-10010 March 2023 Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 4 CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-23-003, Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A2023-01-30030 January 2023 Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A CNL-23-008, Tennessee Valley Authority – Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority – Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-089, License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546)2022-12-20020 December 2022 License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546) CNL-22-090, Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests for the Fifth Inservice Testing Interval2022-12-12012 December 2022 Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests for the Fifth Inservice Testing Interval 2024-09-24
[Table view] |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-16-008 May 26, 2016 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Update on Progress of Facility Modifications for MSIV Leak Rate
References:
- 1. TVA letter to NRC, CNL-15-070, Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Withdrawal of Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs - TS-485, dated May 29, 2015 (ML15159B009)
- 2. TVA letter to NRC, CNL-15-123, Updated Reply to Notice of Violation; EA-11-252; and Follow-up to 10 CFR 50.9, Completeness and accuracy of information, Notification, dated July 15, 2015 (ML15198A353)
In Reference 1, Tennessee Valley Authority (TVA) withdrew a license amendment request (LAR) for the Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3. The LAR had proposed making the primary alternate leakage (ALT) pathway become the secondary pathway and the secondary pathway would become the credited primary ALT pathway. Additionally, the individual leakage and combined leakage rates through each MSIV would be decreased.
Reference 1 was submitted to the NRC to resolve a non-conforming/degraded condition related to the ALT pathway. In Reference 2, TVA informed the Nuclear Regulatory Commission (NRC) that to resolve the non-conforming/degraded condition, TVA would perform facility and licensing basis modifications such that the current licensing basis dose calculations would remain valid. Additionally, in Reference 1 TVA committed to provide the NRC with an annual status of the progress towards resolving the non-conformance beginning one year from the date of Reference 1 and continuing until the non-conformance has been resolved.
Accordingly, the first annual update of progress of facility modifications is provided below.
U.S. Nuclear Regulatory Commission CNL-16-008 Page 2 May 26, 2016 As described in Enclosure 2 of Reference 2, the proposed facility modifications are as follows.
- 1. "The main steam line (MSL) drain valves FCV-1-168, 169 , 170 , and 1-171 will either be replaced with fail-open Air Operated Valves (AOVs) with the same valve open control logic for turbine speed < 1700 rpm or the motor operated valve (MOV) breakers will be locked in the open position or these drain valves will be removed . Thus , an open 2" flow path will be assured.
- 2. MOV FCV-1 -58 will be replaced with a fail-open flow control valve . A second valve will be added in a parallel line around FCV-1-58 to avoid single point vulnerability (SPV) in the event that offsite power is not lost during the LOCA.
- 3. TVA will ensure, by design output, that FCV-1-57 is open and that the motive power is removed when the Unit is in Modes 1, 2 or 3."
Engineering analyses and creation of the associated design change packages are in progress.
Date When Full Compliance Will be Ach ieved The current target schedule for modifying each of the BFN units is during the following outages:
Unit 3: U3R18 Spring 2018 Unit 1: U1R12 Fall 2018 Unit 2: U2R20 Spring 2019 1 There are no changes to the existing compensatory measures described in Reference 2.
Therefore , if the above target schedule is maintained , full compliance will be achieved following the U2R20 outage scheduled for Spring 2019.
ly,sl-Should you have any questions concern ing this submittal, please contact J . L. Paul , Nuclear Site Licensing Manager, at (256) 729-2636.
J.
President, Nuclear Licensing cc: See Page 3 In Enclosure 2 of Reference 2, TVA stated that the modifications for Un it 2 would be completed by March 20 17, which was the scheduled date for the U2R19 outage . However, in Enclosure 2 of Reference 2, TVA indicated the possibility that it may be premature to implement the modifications on BFN Unit 2 during the U2R19 outage and that they may be implemented during the next scheduled outage (i. e., U2R20).
U.S. Nuclear Regulatory Commission CNL-16-008 Page 3 May 26, 2016 cc:
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRR Project Manager - Browns Ferry Nuclear Plant
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-16-008 May 26, 2016 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Update on Progress of Facility Modifications for MSIV Leak Rate
References:
- 1. TVA letter to NRC, CNL-15-070, Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Withdrawal of Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs - TS-485, dated May 29, 2015 (ML15159B009)
- 2. TVA letter to NRC, CNL-15-123, Updated Reply to Notice of Violation; EA-11-252; and Follow-up to 10 CFR 50.9, Completeness and accuracy of information, Notification, dated July 15, 2015 (ML15198A353)
In Reference 1, Tennessee Valley Authority (TVA) withdrew a license amendment request (LAR) for the Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3. The LAR had proposed making the primary alternate leakage (ALT) pathway become the secondary pathway and the secondary pathway would become the credited primary ALT pathway. Additionally, the individual leakage and combined leakage rates through each MSIV would be decreased.
Reference 1 was submitted to the NRC to resolve a non-conforming/degraded condition related to the ALT pathway. In Reference 2, TVA informed the Nuclear Regulatory Commission (NRC) that to resolve the non-conforming/degraded condition, TVA would perform facility and licensing basis modifications such that the current licensing basis dose calculations would remain valid. Additionally, in Reference 1 TVA committed to provide the NRC with an annual status of the progress towards resolving the non-conformance beginning one year from the date of Reference 1 and continuing until the non-conformance has been resolved.
Accordingly, the first annual update of progress of facility modifications is provided below.
U.S. Nuclear Regulatory Commission CNL-16-008 Page 2 May 26, 2016 As described in Enclosure 2 of Reference 2, the proposed facility modifications are as follows.
- 1. "The main steam line (MSL) drain valves FCV-1-168, 169 , 170 , and 1-171 will either be replaced with fail-open Air Operated Valves (AOVs) with the same valve open control logic for turbine speed < 1700 rpm or the motor operated valve (MOV) breakers will be locked in the open position or these drain valves will be removed . Thus , an open 2" flow path will be assured.
- 2. MOV FCV-1 -58 will be replaced with a fail-open flow control valve . A second valve will be added in a parallel line around FCV-1-58 to avoid single point vulnerability (SPV) in the event that offsite power is not lost during the LOCA.
- 3. TVA will ensure, by design output, that FCV-1-57 is open and that the motive power is removed when the Unit is in Modes 1, 2 or 3."
Engineering analyses and creation of the associated design change packages are in progress.
Date When Full Compliance Will be Ach ieved The current target schedule for modifying each of the BFN units is during the following outages:
Unit 3: U3R18 Spring 2018 Unit 1: U1R12 Fall 2018 Unit 2: U2R20 Spring 2019 1 There are no changes to the existing compensatory measures described in Reference 2.
Therefore , if the above target schedule is maintained , full compliance will be achieved following the U2R20 outage scheduled for Spring 2019.
ly,sl-Should you have any questions concern ing this submittal, please contact J . L. Paul , Nuclear Site Licensing Manager, at (256) 729-2636.
J.
President, Nuclear Licensing cc: See Page 3 In Enclosure 2 of Reference 2, TVA stated that the modifications for Un it 2 would be completed by March 20 17, which was the scheduled date for the U2R19 outage . However, in Enclosure 2 of Reference 2, TVA indicated the possibility that it may be premature to implement the modifications on BFN Unit 2 during the U2R19 outage and that they may be implemented during the next scheduled outage (i. e., U2R20).