ML16295A057: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/01/2016
| issue date = 10/01/2016
| title = Final Operating Exam (Sections a, B, and C) (Folder 3)
| title = Final Operating Exam (Sections a, B, and C) (Folder 3)
| author name = Fish T H
| author name = Fish T
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name =  
| addressee name =  
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Administrative TASK NUMBER: 2990010101 2016 NRC EXAM RO-JPM A1 Copy __ of __ TASK: Perform The Watchstanding Duties Of The Nuclear Control Room Operator JPM NUMBER: 305H-JPM.ZZXXX REVISION:
{{#Wiki_filter:JOB PERFORMANCE MEASURE STATION: Hope Creek                               2016 NRC EXAM                        Copy _ _ of _ _
00 SAP BET: NOH05JPZZXXE KIA NUMBER: 2.1.5 Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc. (CFR: 41.10 I 43.5 I 45.12) IMPORTANCE FACTOR: RO: 2.9 SRO: 3.9 ALTERNATE PATH: D APPLICABILITY:
RO-JPM A1 SYSTEM:   Administrative TASK NUMBER:     2990010101 TASK: Perform The Watchstanding Duties Of The Nuclear Control Room Operator JPM NUMBER: 305H-JPM.ZZXXX                                                     REVISION: 00 SAP BET:   NOH05JPZZXXE KIA NUMBER:   2.1.5     Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.
RO IZJ EVALUATION SETTING/METHOD:
(CFR: 41.10 I 43.5 I 45.12)
Classroom/Perform  
IMPORTANCE FACTOR:               RO: 2.9     SRO: 3.9 ALTERNATE PATH:   D APPLICABILITY:                       RO IZJ                               SRoD EVALUATION SETTING/METHOD: Classroom/Perform


==REFERENCES:==
==REFERENCES:==
OP-AA-105-102, Rev. 11 TOOLS, AND EQUIPMENT:        None ESTIMATED COMPLETION TIME:
                                                                                      - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:
                                                                                      - -N/A- - - Minutes JPM PERFORMED BY:                                                      GRADE: SAT      D      UNSAT D ACTUAL COMPLETION TIME:
                                                                                      - - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME:
                                                                                      - -N/A
                                                                                            - - - Minutes REASON IF UNSATISFACTORY:
EVALUATOR:                                                                DATE:
Signature Page 1of12


OP-AA-105-102, Rev. 11 TOOLS, AND EQUIPMENT:
JOB PERFORMANCE MEASURE SYSTEM:     Administrative TASK NUMBER:         2990010101 TASK:   Perform The Watchstanding Duties Of The Nuclear Control Room Operator INITIAL CONDllTONS:
None SRoD ESTIMATED COMPLETION TIME: 15 Minutes ----TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes -----JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: Minutes -----ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes -----REASON IF UNSATISFACTORY:
: 1. You were issued a Reactor Operator (RO) License on May 15, 2016, and assigned as the Tagging NCO in Work Control.
EVALUATOR:
: 2. The computer system is down and the status of your active license must be verified.
DATE: Signature Page 1of12 JOB PERFORMANCE MEASURE SYSTEM: Administrative TASK NUMBER: 2990010101 TASK: Perform The Watchstanding Duties Of The Nuclear Control Room Operator INITIAL CONDllTONS:  
: 3. All shifts stood have been confirmed to be part of the Narrative Log.
: 1. You were issued a Reactor Operator (RO) License on May 15, 2016, and assigned as the Tagging NCO in Work Control. 2. The computer system is down and the status of your active license must be verified.  
: 4. All shifts included turnovers.
: 3. All shifts stood have been confirmed to be part of the Narrative Log. 4. All shifts included turnovers.
INITIATING CUE:
INITIATING CUE: 1. Fill out OP-AA-105-102 Attachment 1 for the third quarter of 2016. 2. Assume no other watchstanding will occur for the remainder of the third quarter of 2016. 3. REVIEW AND DETERMINE lE you will meet the requirements to maintain an active license into the fourth quarter of 2016. 4. Document how you did, or did not, meet the requirements on the following page. Examiner's Note: Provide past work schedule and a copy of OP-AA-105-102.
: 1. Fill out OP-AA-105-102 Attachment 1 for the third quarter of 2016.
Page 2of12 JPM NUMBER: zzxxx NAME:
: 2. Assume no other watchstanding will occur for the remainder of the third quarter of 2016.
REV NUMBER: 00 DATE: STEP STANDARD SAT/ COMMENTS NUMBER ELEMENT (*Critical Step) UNSAT (Required for (#Sequential Step) UNSAT)@ CUE: PROVIDE the operator the initiating cue AND ENTER START TIME AFTER Operator repeats back the Initiating Cue. START TIME: OP-AA-105-102
: 3. REVIEW AND DETERMINE lE you will meet the requirements to maintain an active license into the fourth quarter of 2016.
: 4. MAIN BODY NOTE: The quarterly shift watch Operator reads NOTE. requirement may be completed with a combination of complete 8 and 12-hour shifts (in a position appropriately credited for watch-standing proficiency as discussed below) at sites having a mixed shift schedule, and watches shall not be truncated when the minimum quarterly requirement (56 hours) is satisfied. (NUREG I 1021, Revision 9) 4.1 Active License Maintenance Page 3of12 JPM NUMBER: zzxxx NAME: REV NUMBER: 00 DATE: STEP STANDARD SAT/ COMMENTS ELEMENT (*Critical Step) (Required for NUMBER (#Sequential Step) UNSAT UNSAT)!a>
: 4. Document how you did, or did not, meet the requirements on the following page.
NOTE: As specified in 10 CFR 55.4, Operator reads NOTE. "Definitions," "Actively performing the functions of an operator or senior operator," means that "the individual carries out and is responsible for the duties covered by that position".
Examiner's Note: Provide past work schedule and a copy of OP-AA-105-102.
For RO and SRO watches being credited for license maintenance, administrative tasks not related to the licensed position should be minimized.
Page 2of12
Non-position related administrative tasks performed outside the control room, e.g., NRC physicals, all hands meetings, etc., shall not be scheduled during a credited shift. Non-position related administrative tasks performed inside the control room are allowed during'a credited shift provided the activities do not impact the individual's ability to perform assigned licensed responsibilities; i.e., the individual is in a position to provide prompt assistance to or oversight of the RO at the controls.


====4.1.1. MAINTAIN====
JPM NUMBER:                zzxxx                          NAME:    ~~~~~~~~~~~~~~~~~
an active license by Operator reads Step. actively performing the functions of RO, SRO or LSRO. 1. RO licenses by performing the duties of the Unit RO and/or Unit PO for a minimum of seven 8-hour or five 12-hour shifts per calendar quarter, including turnover to the next shift. 4.1.2 DOCUMENT the required *operator documents the shifts number of shifts on Attachment on 7/10, 7/31, and 8/6 as the 1, Active License Tracking Log required shifts on Attachment  
REV NUMBER:                  00                            DATE:
: 1. or similar computer-based tracking method. Examiner Note: Refer to Examiner's Copy of Attachment  
STANDARD                  COMMENTS STEP                                                                      SAT/
: 1. The order of shifts is not critical.
ELEMENT                          (*Critical Step)            (Required for NUMBER                                                                    UNSAT
Page 4of12 JPM NUMBER: ZZXXX NAME:
(#Sequential Step)              UNSAT)@
REV NUMBER: 00 DATE: STEP STANDARD SAT/ COMMENTS NUMBER ELEMENT (*Critical Step) UNSAT (Required for (#Sequential Step) UNSAT}@ *operator documents that the requirements to maintain an active license into the fourth quarter have NOT been met. Examiner Note: Operator is considered current for the third quarter. *operator documents that additional watches need to be completed by September 30, 2016 to maintain proficiency.
CUE:    PROVIDE the operator the initiating cue AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.
CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME. REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".  
START TIME:
' STOP TIME: Task Standard:
OP-AA-105-102
Operator determines license maintenance requirements have not been met. Specifically only 4 12 hour shifts were worked in the second quarter. @Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments.  
: 4. MAIN BODY NOTE:    The quarterly shift watch        Operator reads NOTE.
[IER L 1-11-3 Rec. 3b] Page 5of12 JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Administrative TASK NUMBER: 4010260201 TASK: Complete A Sunday Shift Routine Log JPM NUMBER: 305H-JPM.ZZOXX SAP BET: NOH05JPZZXXE 2016 NRC EXAM RO-JPM A2 Copy __ of __ REVISION:
requirement may be completed with a combination of complete 8 and 12-hour shifts (in a position appropriately credited for watch-standing proficiency as discussed below) at sites having a mixed shift schedule, and watches shall not be truncated when the minimum quarterly requirement (56 hours) is satisfied. (NUREG                                            I 1021, Revision 9) 4.1    Active License Maintenance Page 3of12
00 KIA NUMBER: 2.1 .. 25 Ability to interpret reference materials, such as graphs, curves, tables, etc. (CFR: 41.10 I 43.5 I 45.12) ALTERNATE PATH: D APPLICABILITY: IMPORTANCE FACTOR: RO: 3.9 SRO: 4.2 sRoD EVALUATION SETTING/METHOD:
 
Classroom/Perform  
JPM NUMBER:              zzxxx                          NAME:
REV NUMBER:                  00                            DATE:
STANDARD                      COMMENTS STEP                                                                            SAT/
ELEMENT                        (*Critical Step)                (Required for NUMBER                                                                          UNSAT
(#Sequential Step)                  UNSAT)!a>
NOTE:  As specified in 10 CFR 55.4,      Operator reads NOTE.
        "Definitions," "Actively performing the functions of an operator or senior operator,"
means that "the individual carries out and is responsible for the duties covered by that position". For RO and SRO watches being credited for license maintenance, administrative tasks not related to the licensed position should be minimized. Non-position related administrative tasks performed outside the control room, e.g., NRC physicals, all hands meetings, etc., shall not be scheduled during a credited shift. Non-position related administrative tasks performed inside the control room are allowed during'a credited shift provided the activities do not impact the individual's ability to perform assigned licensed responsibilities; i.e., the individual is in a position to provide prompt assistance to or oversight of the RO at the controls.
4.1.1. MAINTAIN an active license by     Operator reads Step.
actively performing the functions of RO, SRO or LSRO.
: 1. RO licenses by performing the duties of the Unit RO and/or Unit PO for a minimum of seven 8-hour or five 12-hour shifts per calendar quarter, including turnover to the next shift.
4.1.2 DOCUMENT the required             *operator documents the shifts number of shifts on Attachment     on 7/10, 7/31, and 8/6 as the 1, Active License Tracking Log     required shifts on Attachment 1.
or similar computer-based tracking method.                   Examiner Note: Refer to Examiner's Copy of Attachment 1.
The order of shifts is not critical.
Page 4of12
 
JPM NUMBER:   ~~~~~~~~~-
ZZXXX                             NAME:
REV NUMBER:                 00                             DATE:
STANDARD                          COMMENTS STEP                                                                         SAT/
ELEMENT                             (*Critical Step)                   (Required for NUMBER                                                                        UNSAT
(#Sequential Step)                     UNSAT}@
                                            *operator documents that the requirements to maintain an active license into the fourth quarter have NOT been met.
Examiner Note: Operator is considered current for the third quarter.
                                            *operator documents that additional watches need to be completed by September 30, 2016 to maintain proficiency.
CUE:   WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.
REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
STOP TIME:
Task Standard: Operator determines license maintenance requirements have not been met. Specifically only 4 12 hour shifts were worked in the second quarter.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]
Page 5of12
 
JOB PERFORMANCE MEASURE STATION: Hope Creek                                 2016 NRC EXAM                        Copy _ _ of _ _
RO-JPM A2 SYSTEM: Administrative TASK NUMBER:     4010260201 TASK: Complete A Sunday Shift Routine Log JPM NUMBER: 305H-JPM.ZZOXX                                                     REVISION: 00 SAP BET:   NOH05JPZZXXE KIA NUMBER:   2.1 .. 25   Ability to interpret reference materials, such as graphs, curves, tables, etc.
(CFR: 41.10 I 43.5 I 45.12)
IMPORTANCE FACTOR:           RO: 3.9       SRO: 4.2 ALTERNATE PATH:    D APPLICABILITY:                        RO~                                  sRoD EVALUATION SETTING/METHOD: Classroom/Perform


==REFERENCES:==
==REFERENCES:==
OP-HC-108-116-1001 Rev. 3                  HC.OP-DL.ZZ-0020, Rev. 38 TOOLS, AND EQUIPMENT:          OP-HC-108-116-1001; Straight-edge, Calculator ESTIMATED COMPLETION Tll)llE:      ----
7        Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:              ----
N/A        Minutes JPM PERFORMED BY:                                                        GRADE: SAT      D      UNSAT    D ACTUAL COMPLETION TIME:
                                                                                      - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME:                  N/A
                                                                                      --      - - Minutes REASON IF UNSATISFACTORY:
EVALUATOR:                                                                  DATE:
Signature Page 1of7
JOB PERFORMANCE MEASURE SYSTEM:    Administrative TASK NUMBER:        4010260201 TASK:    Complete A Sunday Shift Routine Log INITIAL CONDllTONS:
: 1. Plant is operating at 100% power fifteen (15) days following a refueling outage.
: 2. HC.OP-DL.ZZ-0020, Sunday Shift Routine Log, is in progress at Step 3.6.7.
: 3. GRIDS A3175, FUEL POOL HX COMMON INLET TEMP, indicates 83F.
: 4. The Reactor Engineer is not available.
INITIATING CUE:
DETERMINE the time for the Hope Creek Spent Fuel Pool (SFP) to reach 200 degrees Fahrenheit {bulk temperature) in the event that normal cooling is lost IAW OP-HC-108-116-1001. ENTER your determination on Attachment 3.
Page 2 of 7


OP-HC-108-116-1001 Rev. 3 HC.OP-DL.ZZ-0020, Rev. 38 TOOLS, AND EQUIPMENT:
JPM NUMBER:               zzoxx                         NAME:     ~~~~~~~~~~~~~~~~-
OP-HC-108-116-1001; Straight-edge, Calculator ESTIMATED COMPLETION Tll)llE: 7 Minutes ----TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes ----JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: Minutes ----ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes ----REASON IF UNSATISFACTORY:
REV NUMBER:                 00                             DATE:
EVALUATOR:
(*Critical Step)                     COMMENTS STEP                                                                          SAT/
DATE: Signature Page 1of7 JOB PERFORMANCE MEASURE SYSTEM: Administrative TASK NUMBER: 4010260201 TASK: Complete A Sunday Shift Routine Log INITIAL CONDllTONS:
ELEMENT                       (#Sequential Step)                     (Required for NUMBER                                                                          UNSAT STANDARD                             UNSAT)@
: 1. Plant is operating at 100% power fifteen (15) days following a refueling outage. 2. HC.OP-DL.ZZ-0020, Sunday Shift Routine Log, is in progress at Step 3.6.7. 3. GRIDS A3175, FUEL POOL HX COMMON INLET TEMP, indicates 83F. 4. The Reactor Engineer is not available.
CUE:   PROVIDE the operator the initiating cue, modified OP-HC-108-116-1001, AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.
INITIATING CUE: DETERMINE the time for the Hope Creek Spent Fuel Pool (SFP) to reach 200 degrees Fahrenheit
START TIME:
{bulk temperature) in the event that normal cooling is lost IAW OP-HC-108-116-1001.
OP-HC-108-116-1001
ENTER your determination on Attachment
: 4. MAIN BODY 4.1   Utilizing Attachment 1, Spent     *#operator determines that the Fuel Pool Decay Heat Load         approximate SFP decay heat rate Determination, determine the     for the current date is approximate SFP decay heat       approximately 9.5 ;t0.1 MBtu/hr.
: 3. Page 2 of 7 JPM NUMBER: zzoxx NAME:
rate for the current date.
REV NUMBER: 00 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ CUE: PROVIDE the operator the initiating cue, modified OP-HC-108-116-1001, AND ENTER START TIME AFTER Operator repeats back the Initiating Cue. START TIME: OP-HC-108-116-1001  
4.2   Select the series of curves from *#operator selects Page 4 of Attachment 2 for loss of         ATTACHMENT 2.
: 4. MAIN BODY 4.1 Utilizing Attachment 1, Spent *#operator determines that the Fuel Pool Decay Heat Load approximate SFP decay heat rate Determination, determine the for the current date is approximate SFP decay heat approximately 9.5 ;t0.1 MBtu/hr. rate for the current date. 4.2 Select the series of curves from *#operator selects Page 4 of Attachment 2 for loss of ATTACHMENT  
cooling, with the initial pool temperature that most closely matches current pool temperature, (round up to the next highest Fuel Pool                         '
: 2. cooling, with the initial pool temperature that most closely matches current pool temperature, (round up to the next highest Fuel Pool ' Temperature curve). 4.3 Utilizing the decay heat rate *# Operator determines the time determined in 4.1, determine in hours for the SFP to reach the time in hours for the SFP to 200°F in the event normal reach 200 °F in the event cooling is lost to be 44 ;t2 hours, normal cooling is lost. IF necessary, interpolate the heat and enters this time on Attachment load between lines. 3. ,, 4.4 Submit the completed time to Operator submits the completed CRS for review. time to CRS for review. CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME. REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
Temperature curve).
STOP TIME: Task Standard:
4.3   Utilizing the decay heat rate     *# Operator determines the time determined in 4.1, determine     in hours for the SFP to reach the time in hours for the SFP to 200°F in the event normal reach 200 °F in the event         cooling is lost to be 44 ;t2 hours, normal cooling is lost. IF necessary, interpolate the heat   and enters this time on Attachment load between lines.               3.           ,,
Operator determines the Spent Fuel Pool decay heat load IAW OP-HC-108-116-1001.  
4.4   Submit the completed time to     Operator submits the completed CRS for review.                   time to CRS for review.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments.  
CUE:   WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.
[IER L 1-11-3 Rec. 3b] Page 3of7 JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Administrative TASK NUMBER: 2990020301 2016 NRC EXAM RO-JPM A3 Copy __ of __ TASK: Perform A Manual Tagout With SAP System Inoperable JPM NUMBER: 305H-JPM.ZZXXX REVISION:
REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
00 SAP BET: NOH05JPZZXXE KIA NUMBER: 2.2.41 Ability to obtain and interpret station electrical and mechanical drawings. (CFR: 41.10 / 45.12 / 45.13) ALTERNATE PATH: D APPLICABILITY: IMPORTANCE FACTOR: RO: 3.5 SRO: 3.9 sRoD EVALUATION SETTING/METHOD:
STOP TIME:
Classroom/Perform  
Task Standard: Operator determines the Spent Fuel Pool decay heat load IAW OP-HC-108-116-1001.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]
Page 3of7
 
JOB PERFORMANCE MEASURE STATION: Hope Creek                               2016 NRC EXAM                        Copy _ _ of _ _
RO-JPM A3 SYSTEM:   Administrative TASK NUMBER:     2990020301 TASK: Perform A Manual Tagout With SAP System Inoperable JPM NUMBER: 305H-JPM.ZZXXX                                                     REVISION: 00 SAP BET:   NOH05JPZZXXE KIA NUMBER:   2.2.41   Ability to obtain and interpret station electrical and mechanical drawings.
(CFR: 41.10 / 45.12 / 45.13)
IMPORTANCE FACTOR:             RO: 3.5       SRO: 3.9 ALTERNATE PATH:    D APPLICABILITY:                      RO~                                    sRoD EVALUATION SETTING/METHOD: Classroom/Perform


==REFERENCES:==
==REFERENCES:==
M-51-1 Sheets 1 and 2, Rev. 50/44          OP-AA-109-115, Rev. 7 TOOLS, AND EQUIPMENT:        Highlighters; M-51-1 Sheets 1 and 2 [Large Size]
ESTIMATED COMPLETION T'ME: _ _1_7_ _ Minutes TIME PERIOD IDENTIF.IED FOR TIME CRITICAL STEPS:                    N/A
                                                                                      --      - - Minutes JPM PERFORMED BY:                                                        GRADE: SAT    D        UNSAT D ACTUAL COMPLETION TIME:
                                                                                      - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME:                    N/A
                                                                                      --      - - Minutes REASON IF UNSATISFACTORY:
EVALUATOR:                                                                DATE:
Signature Page 1of11


M-51-1 Sheets 1 and 2, Rev. 50/44 OP-AA-109-115, Rev. 7 TOOLS, AND EQUIPMENT:
JOB PERFORMANCE MEASURE SYSTEM:     Administrative TASK NUMBER:       2990020301 TASK:     Perform A Manual Tagout With SAP System Inoperable INITIAL CONDllTONS:
Highlighters; M-51-1 Sheets 1 and 2 [Large Size] ESTIMATED COMPLETION T'ME: __ 1_7 __ Minutes TIME PERIOD IDENTIF.IED FOR TIME CRITICAL STEPS: N/A Minutes ----JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: Minutes ----ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes ----REASON IF UNSATISFACTORY:
: 1. The plant is operating at 100% power.
EVALUATOR:
: 2. The Residual Heat Removal (RHR) System is in its normal standby lineup.
DATE: Signature Page 1of11 JOB PERFORMANCE MEASURE SYSTEM: Administrative TASK NUMBER: 2990020301 TASK: Perform A Manual Tagout With SAP System Inoperable INITIAL CONDllTONS:  
: 3. HV-F007C, RHR Pump C Min Flow Valve, is scheduled for in-body repair work.
: 1. The plant is operating at 100% power. 2. The Residual Heat Removal (RHR) System is in its normal standby lineup. 3. HV-F007C, RHR Pump C Min Flow Valve, is scheduled for in-body repair work. INITIATING CUE: HV-F007C, RHR Pump C Min Flow Valve, and its associated piping and electrical components need to be ISOLATED, VENTED, AND DRAINED to perform the repairs. Using controlled station drawing M-51-1, sheets 1 and 2 (provided):  
INITIATING CUE:
: 1. IDENTIFY the Mechanical components that are required to be tagged, and their required positions.  
HV-F007C, RHR Pump C Min Flow Valve, and its associated piping and electrical components need to be ISOLATED, VENTED, AND DRAINED to perform the repairs. Using controlled station drawing M-51-1, sheets 1 and 2 (provided):
: 1. IDENTIFY the Mechanical components that are required to be tagged, and their required positions.
: 2. IDENTIFY the Electrical components that are required to be tagged, and their required positions, NOTE: The following are NOT required to be identified:
: 2. IDENTIFY the Electrical components that are required to be tagged, and their required positions, NOTE: The following are NOT required to be identified:
* Electrical Breaker number(s)
* Electrical Breaker number(s)
Line 87: Line 160:
* Type of tag (Red blocking Tag, Worker Blocking Tag, etc)
* Type of tag (Red blocking Tag, Worker Blocking Tag, etc)
* Current position
* Current position
* Tag Sequence Page 2of11 JPM NUMBER: zzxxx NAME:
* Tag Sequence Page 2of11
REV NUMBER: 00 DATE: STEP STANDARD SAT/ COMMENTS NUMBER ELEMENT (*Critical Step) UNSAT (Required for (#Sequential Step) UNSAT)@ CUE: PROVIDE the operator:
the initiating cue; M-51-1, Sheets 1 and 2; AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue. START TIME: OP-AA-109-115


====4.1.2 Determine====
JPM NUMBER:            zzxxx                              NAME:    ~~~~~~~~~~~~~~~~~
REV NUMBER:                00                              DATE:
STANDARD                      COMMENTS STEP                                                                          SAT/
ELEMENT                            (*Critical Step)                (Required for NUMBER                                                                          UNSAT
(#Sequential Step)                UNSAT)@
CUE:    PROVIDE the operator: the initiating cue; M-51-1, Sheets 1 and 2; AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue.
START TIME:
OP-AA-109-115 4.1.2   Determine Blocking Points and Tag Types (Initiator)
: 1. Review the following:
              -  Controlled Documents and Drawings from the      Operator reviews provided M-51-1, TOR or DCRMS. If...        Sheets 1 and 2.
: 2. Perform the following:        Operator determines the blocking points AND required positions by
              -  Select blocking points    reviewing the controlled drawing.
and tag types.
Applicant identifies the following mechanical isolation valves:
Applicant identifies the following mechanical isolation valves AND the required positions:
                                            *  *V132, SHUT
                                            *  *V317, S.HUT
                                            *  *HV-F024A (V124), SHUT
                                            *  *HV-F010A (V125), SHUT
                                            *  *HV-F011A (V126), SHUT
                                            *  *v20s, SHUT
                                            *  *HV-F007A (V128), SHUT Applicant identifies the following mechanical VENT AND the required positions:
                                            *  *V372, OPEN
                                            *  *V373, OPEN Examiner Note: V338 and V339 would satisfy this vent path.
Page 3of11


Blocking Points and Tag Types (Initiator)
JPM NUMBER:     ZZXXX
: 1. Review the following:  
            ~~~~~~~~~-
-Controlled Documents and Drawings from the Operator reviews provided M-51-1, TOR or DCRMS. If ... Sheets 1 and 2. 2. Perform the following:
NAME:   ~~~~~~~~~~~~~~~~~
Operator determines the blocking Select blocking points points AND required positions by -reviewing the controlled drawing. and tag types. Applicant identifies the following mechanical isolation valves: Applicant identifies the following mechanical isolation valves AND the required positions:
REV NUMBER:       00                   DATE:
* *V132, SHUT * *V317, S.HUT * *HV-F024A (V124), SHUT * *HV-F010A (V125), SHUT * *HV-F011A (V126), SHUT * *v20s, SHUT * *HV-F007A (V128), SHUT Applicant identifies the following mechanical VENT AND the required positions:
STANDARD                      COMMENTS STEP                                                       SAT/
* *V372, OPEN * *V373, OPEN Examiner Note: V338 and V339 would satisfy this vent path. Page 3of11 JPM NUMBER: ZZXXX NAME:
ELEMENT             (*Critical Step)               (Required for NUMBER                                                       UNSAT
REV NUMBER: 00 DATE: STEP STANDARD SAT/ COMMENTS ELEMENT (*Critical Step) (Required for NUMBER (#Sequential Step) UNSAT UNSAT)@ Applicant identifies the following mechanical DRAIN valves AND the required positions:  
(#Sequential Step)                 UNSAT)@
* *V554, OPEN * *V555, OPEN Applicant identifies the following ELECTRICAL components AND the required positions:  
Applicant identifies the following mechanical DRAIN valves AND the required positions:
* *HV-F007C (V131) MOV breaker, OPEN * *HV-F024A (V124) MOV breaker, OPEN * *HV-F010A (V125) MOV breaker, OPEN *HV-F007A (V128) MOV '
                      *   *V554, OPEN
* breaker, OPEN Examiner Note: Breaker numbers are not required.
                      *   *V555, OPEN Applicant identifies the following ELECTRICAL components AND the required positions:
                      *   *HV-F007C (V131) MOV breaker, OPEN
                      *   *HV-F024A (V124) MOV breaker, OPEN
                      *   *HV-F010A (V125) MOV breaker, OPEN
                      *    *HV-F007A (V128) MOV breaker, OPEN Examiner Note: Breaker numbers are not required.
Examiner Note: The Applicant may identify the following additional components as part of the tagout for equipment protection or safety precaution (not considered critical):
Examiner Note: The Applicant may identify the following additional components as part of the tagout for equipment protection or safety precaution (not considered critical):
* HV-F007C (V131 ), OPEN (to allow proper draining on both upstream/downstream sides of valve)
* HV-F007C (V131 ), OPEN (to allow proper draining on both upstream/downstream sides of valve)
* CP202 RHR Pump 4kV Breaker, OPEN/PTL
* CP202 RHR Pump 4kV Breaker, OPEN/PTL
* AP202 RHR Pump 4kV Breaker, OPEN/PTL
* AP202 RHR Pump 4kV Breaker, OPEN/PTL
* V338 AND/OR V339, CLOSED (test connection).
* V338 AND/OR V339, CLOSED (test connection). Unless opened as vent path.
Unless opened as vent path.
* V9988 AND V9989, CLOSED (flow ports for FE4436C)
* V9988 AND V9989, CLOSED (flow ports for FE4436C)
* AP202 and CP202 control room hand switches Page 4of11 JPM NUMBER: ZZXXX NAME:
* AP202 and CP202 control room hand switches Page 4of11
REV NUMBER: 00 DATE: STEP STANDARD SAT/ COMMENTS NUMBER ELEMENT (*Critical Step) UNSAT (Required for (#Sequential Step) UNSAT)@ CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME. REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
 
STOP TIME: Task Standard:
JPM NUMBER:   ~~~~~~~~~~
Operator IDENTIFIES the mechanical and electrical components, and their required positions, to ISOLATE, VENT, AND DRAIN the affected pipe using controlled station Mechanical Drawings as noted. @Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments.  
ZZXXX                         NAME:   ~~~~~~~~~~~~~~~~~
[IER L 1-11-3 Rec. 3b] Page 5of11 JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Conduct of Operations TASK NUMBER: 4010010201 TASK: Complete the Daily Surveillance Logs JPM NUMBER: 305H-JPM.ZZ017 SAP BET: NOH05JPZZ17E 2016 NRC EXAM SRO-JPM A1 Copy __ of __ REVISION:
REV NUMBER:               00                           DATE:
04 K/A NUMBER: 2.1.18 Ability to make accurate, clear, and concise logs, records, status boards, I and reports. (CFR: 41.10 I 45.12 I 45.13) ALTERNATE PATH: D APPLICABILITY:
STANDARD                                COMMENTS STEP                                                                         SAT/
IMPORTANCE FACTOR: RO: 3.6 SRO: 3.8 EVALUATION SETTING/METHOD:
ELEMENT                         (*Critical Step)                         (Required for NUMBER                                                                        UNSAT
Classroom/Perform  
(#Sequential Step)                           UNSAT)@
CUE:   WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.
REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
STOP TIME:
Task Standard: Operator IDENTIFIES the mechanical and electrical components, and their required positions, to ISOLATE, VENT, AND DRAIN the affected pipe using controlled station Mechanical Drawings as noted.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]
Page 5of11
 
JOB PERFORMANCE MEASURE STATION: Hope Creek                             2016 NRC EXAM                        Copy _ _ of _ _
SRO-JPM A1 SYSTEM: Conduct of Operations TASK NUMBER:     4010010201 TASK: Complete the Daily Surveillance Logs JPM NUMBER: 305H-JPM.ZZ017                                                 REVISION: 04 SAP BET: NOH05JPZZ17E K/A NUMBER:   2.1.18 Ability to make accurate, clear, and concise logs, records, status boards, I and reports.
(CFR: 41.10 I 45.12 I 45.13)
IMPORTANCE FACTOR:             RO: 3.6       SRO: 3.8 ALTERNATE PATH:    D APPLICABILITY:                                                        SRO~
EVALUATION SETTING/METHOD:         Classroom/Perform


==REFERENCES:==
==REFERENCES:==
HC.OP-DL.ZZ-0026 Rev. 153 TOOLS, AND EQUIPMENT:      HC.OP-DL.ZZ-0026; HC.OP-IS.BD-0001 ESTIMATED COMPLETION TIME:          - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:                  N/A
                                                                                  --    - - Minutes JPM PERFORMED BY:                                                  GRADE: SAT      D      UNSAT    D ACTUAL COMPLETION TIME:
                                                                                  - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME:                  N/A
                                                                                  --    - - Minutes REASON IF UNSATISFACTORY:
EVALUATOR:                                                              DATE:
Signature Page 1of10


HC.OP-DL.ZZ-0026 Rev. 153 TOOLS, AND EQUIPMENT:
JOB PERFORMANCE MEASURE SYSTEM:     Conduct of Operations TASK NUMBER:       4010010201 TASK:   Complete the Daily Surveillance Logs INITIAL CONDllTONS:
HC.OP-DL.ZZ-0026; HC.OP-IS.BD-0001 ESTIMATED COMPLETION TIME: 13 Minutes ----TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes ----JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: Minutes ----ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes ----REASON IF UNSATISFACTORY:
: 1. The Plant is in OPCON 1 at 35% power
EVALUATOR:
: 2. A plant startup from a forced outage is in progress IAW HC.OP-IO.ZZ-0003.
DATE: Signature Page 1of10 JOB PERFORMANCE MEASURE SYSTEM: Conduct of Operations TASK NUMBER: 4010010201 TASK: Complete the Daily Surveillance Logs INITIAL CONDllTONS: 1 . The Plant is in OPCON 1 at 35% power 2. A plant startup from a forced outage is in progress IAW HC.OP-IO.ZZ-0003.  
: 3. RCIC IST is in progress and being turned over.
: 3. RCIC IST is in progress and being turned over. 4. River level is at 96.1 feet due to recent heavy rains. 5. River temperature is 83 degF but is NOT expected to exceed 85 degF. 6. All EDGs, SACS, and SSW pumps are operable.  
: 4. River level is at 96.1 feet due to recent heavy rains.
: 7. The SPV Effluent RMS Skid (all components) is inoperable and has been CIT for repairs. INITIATING CUE: You are the Control Room Supervisor.
: 5. River temperature is 83 degF but is NOT expected to exceed 85 degF.
: 6. All EDGs, SACS, and SSW pumps are operable.
: 7. The SPV Effluent RMS Skid (all components) is inoperable and has been CIT for repairs.
INITIATING CUE:
You are the Control Room Supervisor.
IMPLEMENT the log at the beginning of today by completing Attachment 1, Section A; Log Initiation, IDENTIFYING those Attachments that require performance due to the present conditions.
IMPLEMENT the log at the beginning of today by completing Attachment 1, Section A; Log Initiation, IDENTIFYING those Attachments that require performance due to the present conditions.
Page 2of10 JPM NUMBER: ZZ017 NAME:
Page 2of10
REV NUMBER: 04 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ CUE: PROVIDE the operator the initiating cue; a paper copy of HC.OP-DL.ZZ-0026; Attachment 1 of HG.OP-DL.ZZ-0026; AND ENTER START TIME AFTER Operator repeats back the Initiating Cue. START TIME: If requested, provide copy of HC.OP-IS.BD-0001.
 
Operator determines beginning Operator determines correct step of the procedure.
JPM NUMBER: ~~~~~~~~~~
beginning step to be 2.1. 2.1 Shift Manager/Control Room Supervisor  
ZZ017                           NAME:     ~~~~~~~~~~~~~~~~~
-the SM/CRS is responsible to implement, review, and ensure completion of the log including (CRS has primary responsibility for all log reviews and documentation):
REV NUMBER:                 04                             DATE:
2.1.1 The SM/CRS shall Examiner Note: Examiner Copy implement the log at the Exhibit 1 is provided for reference.  
(*Critical Step)                   COMMENTS STEP                                                                          SAT/
' beginning of each day by completing Attachment 1, Operator determines Attachment 1 Section A; Log Initiation, is required due to current listing those Attachments Operational Condition.
ELEMENT                         (#Sequential Step)                   (Required for NUMBER                                                                          UNSAT STANDARD                           UNSAT)@
that require performance due to present conditions.
CUE: PROVIDE the operator the initiating cue; a paper copy of HC.OP-DL.ZZ-0026; Attachment 1 of HG.OP-DL.ZZ-0026; AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.
Also, the present Operational Condition shall be listed. Operator checks Attachment 1 on Attachment 1 Section A Log Initiation.
START TIME:
Operator determined Attachment 3m is required due to RCIC IST adding heat to the Suppression Pool. *operator checks Attachment 3m on Attachment 1 Section A Log Initiation.
If requested, provide copy of HC.OP-IS.BD-0001.
Operator determines Attachment 3k is required IAW Item 1 and T/S 4.7.3 due to current River Water level. *operator checks Attachment 3k on Attachment 1 Section A Log Initiation.
Operator determines beginning     Operator determines correct step of the procedure.             beginning step to be 2.1.
Page 3of10 JPM NUMBER: REV NUMBER: STEP NUMBER ZZ017 04 ELEMENT NAME: DATE: (*Critical Step) (#Sequential Step) STANDARD Operator determines Attachment 3h is required IAW Item 1 and T/S 4.7.1.3.b.1 due to current River Water temperature.  
2.1 Shift Manager/Control Room Supervisor - the SM/CRS is responsible to implement, review, and ensure completion of the log including (CRS has primary responsibility for all log reviews and documentation):
*operator checks Attachment 3h on Attachment 1 Section A Log Initiation.
2.1.1 The SM/CRS shall Examiner Note: Examiner Copy implement the log at the Exhibit 1 is provided for reference.                     '
Operator determines Attachment 3t is required IAW Item 42 due to SPV RMS Inoperable.  
beginning of each day by completing Attachment 1,   Operator determines Attachment 1 Section A; Log Initiation, is required due to current listing those Attachments   Operational Condition.
*operator checks Attachment 3t on Attachment 1 Section A Log Initiation.
that require performance due to present conditions. Also, the present Operational Condition shall be listed.
Operator places a "1" in the Operational Condition blank. Operator determines Attachment 3z is required for tracking purposes.
Operator checks Attachment 1 on Attachment 1 Section A Log Initiation.
Operator determined Attachment 3m is required due to RCIC IST adding heat to the Suppression Pool.
                                          *operator checks Attachment 3m on Attachment 1 Section A Log Initiation.
Operator determines Attachment 3k is required IAW Item 1 and T/S 4.7.3 due to current River Water level.
                                          *operator checks Attachment 3k on Attachment 1 Section A Log Initiation.
Page 3of10
 
JPM NUMBER:             ZZ017                            NAME:
REV NUMBER:               04                               DATE:
(*Critical Step)                       COMMENTS STEP                                                                            SAT/
ELEMENT                          (#Sequential Step)                       (Required for NUMBER                                                                            UNSAT STANDARD                               UNSAT)
Operator determines Attachment 3h is required IAW Item 1 and T/S 4.7.1.3.b.1 due to current River Water temperature.
                                          *operator checks Attachment 3h on Attachment 1 Section A Log Initiation.
Operator determines Attachment 3t is required IAW Item 42 due to SPV RMS Inoperable.
                                          *operator checks Attachment 3t on Attachment 1 Section A Log Initiation.
Operator places a "1" in the Operational Condition blank.
Operator determines Attachment 3z is required for tracking purposes.
Operator checks Attachment 3z on Attachment 1 Section A Log Initiation.
Operator checks Attachment 3z on Attachment 1 Section A Log Initiation.
Operator checks Attachment 5 on Attachment 1 Section A Log Initiation.
Operator checks Attachment 5 on Attachment 1 Section A Log Initiation.
Examiner Note: Although not specifically required by the current conditions, Attachment 5 is typically used each day to track surveillance procedures and would be needed the first time a surveillance procedure with an action time is actually logged on. SAT/ UNSAT COMMENTS (Required for UNSAT) CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME. REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
Examiner Note: Although not specifically required by the current conditions, Attachment 5 is typically used each day to track surveillance procedures and would be needed the first time a surveillance procedure with an action time is actually logged on.
STOP TIME: Task Standard:
CUE:   WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.
Operator implements the log at the beginning of the day by completing Attachment 1, Section A, of HC. OP-DL.ZZ-0026.  
REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments.  
STOP TIME:
[IER L 1-11-3 Rec. 3b] Page 4of10 JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Administrative TASK NUMBER: 2990750302 2016 NRC EXAM SRO-JPM A2 TASK: Ensure The Operating Shift Is Adequately Manned JPM NUMBER: 305H-JPM.ZZXXX SAP BET: NOH05JPZZXXE
Task Standard: Operator implements the log at the beginning of the day by completing Attachment 1, Section A, of HC. OP-DL.ZZ-0026.
* Copy __ of __ REVISION:
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]
00 KIA NUMBER: 2.1.5 Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc. (CFR: 41.10 I 43.5 I 45.12) IMPORTANCE FACTOR: RO: 2.9 SRO: 3.9 ALTERNATE PATH: D APPLICABILITY:
Page 4of10
EVALUATION SETTING/METHOD:
 
Classroom/Perform  
JOB PERFORMANCE MEASURE STATION: Hope Creek                               2016 NRC EXAM
* Copy _ _ of _ _
SRO-JPM A2 SYSTEM: Administrative TASK NUMBER:     2990750302 TASK: Ensure The Operating Shift Is Adequately Manned JPM NUMBER: 305H-JPM.ZZXXX                                                   REVISION: 00 SAP BET:   NOH05JPZZXXE KIA NUMBER:   2.1.5   Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.
(CFR: 41.10 I 43.5 I 45.12)
IMPORTANCE FACTOR:               RO: 2.9     SRO: 3.9 ALTERNATE PATH:   D APPLICABILITY:                                                             SRO~
EVALUATION SETTING/METHOD: Classroom/Perform


==REFERENCES:==
==REFERENCES:==
OP-AA-105-102, Rev. 11 TOOLS, AND EQUIPMENT:      OP-AA-105-102 ESTIMATED COMPLETION TIME:                  6
                                                                                    ---    - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:
                                                                                    - -N/A- - - Minutes JPM PERFORMED BY:                                                      GRADE: SAT      D      UNSAT D ACTUAL COMPLETION TIME:
                                                                                    - - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME:
                                                                                    - -N/A- - - Minutes REASON IF UNSATISFACTORY:
EVALUATOR:                                                                DATE:
Signature Page 1of8


OP-AA-105-102, Rev. 11 TOOLS, AND EQUIPMENT:
JOB PERFORMANCE MEASURE SYSTEM:     Administrative TASK NUMBER:       2990750302 TASK:     Ensure The Operating Shift Is Adequately Manned INITIAL CONDllTONS:
OP-AA-105-102 ESTIMATED COMPLETION TIME: 6 Minutes -----TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes -----JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: Minutes -----ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes -----REASON IF UNSATISFACTORY:
: 1. John Smith is in the process of license re-activation for the Control Room Supervisor position in accordance with OP-AA-105-102, NRC Active License Maintenance. Refer to the provided OP-AA-105-102, Attachment 2.
EVALUATOR:
: 2. The Operations Training Manager has signified that the license holder is current in the Requal Program and Completion of plant-specific activation guide.
DATE: Signature Page 1of8 JOB PERFORMANCE MEASURE SYSTEM: Administrative TASK NUMBER: 2990750302 TASK: Ensure The Operating Shift Is Adequately Manned INITIAL CONDllTONS:  
: 3. The License Coordinator has verified that medical/respiratory protection qualifications are current.
: 1. John Smith is in the process of license re-activation for the Control Room Supervisor position in accordance with OP-AA-105-102, NRC Active License Maintenance.
: 4. SRO John Smith and the Operations Support Manager have verified that the license holder is compliant with
Refer to the provided OP-AA-105-102, Attachment  
      & concurs with restrictions on current NRC license.
: 2. 2. The Operations Training Manager has signified that the license holder is current in the Requal Program and Completion of plant-specific activation guide. 3. The License Coordinator has verified that medical/respiratory protection qualifications are current. 4. SRO John Smith and the Operations Support Manager have verified that the license holder is compliant with & concurs with restrictions on current NRC license. 5. SRO John Smith has completed the following:
: 5. SRO John Smith has completed the following:
* Main Control Room Tour: Completed with a current CRS on July 3, 2016
* Main Control Room Tour: Completed with a current CRS on July 3, 2016
* Turbine Building Tour: Completed with the on watch SM on July 14, 2016
* Turbine Building Tour: Completed with the on watch SM on July 14, 2016
Line 170: Line 318:
* Station Service Water and Yard Tour: Completed with the on watch Yard Equipment Operator on July 20, 2016
* Station Service Water and Yard Tour: Completed with the on watch Yard Equipment Operator on July 20, 2016
* Auxiliary Building Tour: Completed with a Current CRS on August 4, 2016.
* Auxiliary Building Tour: Completed with a Current CRS on August 4, 2016.
* Reviewed Shift Turnover responsibilities I procedure.  
* Reviewed Shift Turnover responsibilities I procedure.
: 6. SRO John Smith completed the Hours on Shift as shown. INITIATING CUE: Today is August 23, 2016. PERFORM the Shift Manager review of the OP-AA-105-102, Attachment 2, for John Smith's SRO license renewal for the Control Room Supervisor position.
: 6. SRO John Smith completed the Hours on Shift as shown.
COMPLETE the review AND SIGN the attachment, IF appropriate, OR LIST all gaps that require resolution before the form can be signed. Page 2 of 8 JPM NUMBER: ZZXXX NAME:
INITIATING CUE:
REV NUMBER: 00 DATE: STEP STANDARD SAT/ COMMENTS NUMBER ELEMENT (*Critical Step) UNSAT (Required for (#Sequential Step) UNSAT)@ CUE: PROVIDE the operator:
Today is August 23, 2016.
the initiating cue, a copy of OP-AA-105-102; the marked up Attachment 2 of OP-AA-105-102; AND ENTER START TIME AFTER Operator repeats back the Initiating Cue. START TIME: OP-AA-105-102  
PERFORM the Shift Manager review of the OP-AA-105-102, Attachment 2, for John Smith's SRO license renewal for the Control Room Supervisor position.
COMPLETE the review AND SIGN the attachment, IF appropriate, OR LIST all gaps that require resolution before the form can be signed.
Page 2 of 8
 
JPM NUMBER:     ~~~~~~~~~-
ZZXXX                         NAME:     ~~~~~~~~~~~~~~~~~
REV NUMBER:                   00                           DATE:
STANDARD                              COMMENTS STEP                                                                           SAT/
ELEMENT                         (*Critical Step)                         (Required for NUMBER                                                                          UNSAT
(#Sequential Step)                         UNSAT)@
CUE:   PROVIDE the operator: the initiating cue, a copy of OP-AA-105-102; the marked up Attachment 2 of OP-AA-105-102; AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.
START TIME:
OP-AA-105-102 4.2.3. DOCUMENT the reactivation on Attachment 2, Reactivation of License Log .                  *operator reviews the
: 1. The Shift Manager shall      Attachment 2 and the Initial signify that the required    Conditions. The operator OJT hours were              identifies that not all tours were completed.                    completed with an ACTIVE SRO license holder.
                                            *operator reviews the Attachment 2 and the Initial
                                  '        Conditions. The operator identifies that the watch hours stood as the CRS ONLY [20 hours total] could be used towards the 40 hours of watchstanding requirements.
* Operator does NOT sign as the Shift Manager.
CUE:    WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.
REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
STOP TIME:
Task Standard: Operator determines license reactivation requirements have not been met in accordance with OP-AA-105-102.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]
Page 3 of 8


====4.2.3. DOCUMENT====
JOB PERFORMANCE MEASURE STATION: Hope Creek                                 2016 NRC EXAM                      Copy _ _ of _ _
the reactivation on Attachment 2, Reactivation of License Log . *operator reviews the 1. The Shift Manager shall Attachment 2 and the Initial signify that the required Conditions.
SRO-JPM A3 SYSTEM:   Administrative TASK NUMBER:     WCD_CRS_001 TASK: Perform WCD Review and Pre-Approval JPM NUMBER: 305H-JPM.ZZXXX                                                     REVISION: 00 SAP BET:   NOH05JPZZXXE K/A NUMBER:   2.2.41   Ability to obtain and interpret station electrical and mechanical drawings.
The operator OJT hours were identifies that not all tours were completed.
(CFR: 41.10 I 45.12 I 45.13)
completed with an ACTIVE SRO license holder. *operator reviews the Attachment 2 and the Initial ' Conditions.
IMPORTANCE FACTOR:             RO: 3.5       SRO: 3.9 ALTERNATE PATH:    D APPLICABILITY:                      ROD                                    SRO~
The operator identifies that the watch hours stood as the CRS ONLY [20 hours total] could be used towards the 40 hours of watchstanding requirements.
EVALUATION SETTING/METHOD: Classroom/Perform
* Operator does NOT sign as the Shift Manager. CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME. REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
STOP TIME: Task Standard:
Operator determines license reactivation requirements have not been met in accordance with OP-AA-105-102.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments.
[IER L 1-11-3 Rec. 3b] Page 3 of 8 JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Administrative TASK NUMBER: WCD_CRS_001 TASK: Perform WCD Review and Pre-Approval JPM NUMBER: 305H-JPM.ZZXXX SAP BET: NOH05JPZZXXE 2016 NRC EXAM SRO-JPM A3 Copy __ of __ REVISION:
00 K/A NUMBER: 2.2.41 Ability to obtain and interpret station electrical and mechanical drawings. (CFR: 41.10 I 45.12 I 45.13) ALTERNATE PATH: D APPLICABILITY:
ROD IMPORTANCE FACTOR: RO: 3.5 SRO: 3.9 EVALUATION SETTING/METHOD:
Classroom/Perform  


==REFERENCES:==
==REFERENCES:==
OP-AA-109-115, Rev. 9                      M-51-1 Sheet 2, Rev. 44 TOOLS, AND EQUIPMENT:        M-51-1Sheet1and2, Rev. 50/44 [Large size]; OP-AA-109-115, Rev. 9; Technical Specifications,.Amendment 199 ESTIMATED COMPLETION TIME:                16
                                                                                      ---      - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:
                                                                                      - -N/A- - - Minutes JPM PERFORMED BY:                                                        GRADE: SAT    D      UNSAT  D ACTUAL COMPLETION TIME:
                                                                                      - - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME:                    N/A      Minutes REASON IF UNSATISFACTORY:
EVALUATOR:                                                                DATE:
Signature Page 1of11


OP-AA-109-115, Rev. 9 M-51-1 Sheet 2, Rev. 44 TOOLS, AND EQUIPMENT:
JOB PERFORMANCE MEASURE SYSTEM:     Administrative TASK NUMBER:       WCD_CRS_001 TASK:   Perform WCD Review and Pre-Approval INITIAL CONDllTONS:
M-51-1Sheet1and2, Rev. 50/44 [Large size]; OP-AA-109-115, Rev. 9; Technical Specifications,.Amendment 199 ' ESTIMATED COMPLETION TIME: 16 Minutes -----TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes -----JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: Minutes -----ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON IF UNSATISFACTORY:
: 1. The plant is operating at OPERATIONAL CONDITION 1.
EVALUATOR:
: 2. The Core Spray, ADS, HPCI and RCIC systems are OPERABLE.
DATE: Signature Page 1of11 JOB PERFORMANCE MEASURE SYSTEM: Administrative TASK NUMBER: WCD_CRS_001 TASK: Perform WCD Review and Pre-Approval INITIAL CONDllTONS:  
: 3. BC-HV-FOO?C, OP/V131 RHR PMP C MIN FL VLV, requires internal repair work.
: 1. The plant is operating at OPERATIONAL CONDITION  
: 4. SAP is unavailable.
: 1. 2. The Core Spray, ADS, HPCI and RCIC systems are OPERABLE.  
INITIATING CUE:
: 3. BC-HV-FOO?C, OP/V131 RHR PMP C MIN FL VLV, requires internal repair work. 4. SAP is unavailable.
You are the licensed Authorizing Supervisor designated to review and approve Work Clearance Documents (WCDs). You have been presented with the WCD for Independent Review and Pre-Approval in accordance with OP-AA-109-115, Safety Tagging Operations.
INITIATING CUE: You are the licensed Authorizing Supervisor designated to review and approve Work Clearance Documents (WCDs). You have been presented with the WCD for Independent Review and Pre-Approval in accordance with OP-AA-109-115, Safety Tagging Operations.
PERFORM the following:
PERFORM the following:  
: 1. Independently check that the WCD adequately isolates the equipment to be worked.
: 1. Independently check that the WCD adequately isolates the equipment to be worked. NOTE: Electrical breaker numbers are NOT required to be identified.
NOTE: Electrical breaker numbers are NOT required to be identified. Additionally, the type of tag (Red blocking Tag, Worker Blocking Tag, etc.), and the sequence of blocking points, are NOT required to be identified.
Additionally, the type of tag (Red blocking Tag, Worker Blocking Tag, etc.), and the sequence of blocking points, are NOT required to be identified.  
: 2. REVIEW Technical Specifications for applicable Limiting Conditions for Operation (LCOs):
: 2. REVIEW Technical Specifications for applicable Limiting Conditions for Operation (LCOs):
* IDENTIFY AND ENTER ON THE WCD ONLY those Technical Specifications required to be entered (ACTIVE) when the system is to be placed in this configuration.
* IDENTIFY AND ENTER ON THE WCD ONLY those Technical Specifications required to be entered (ACTIVE) when the system is to be placed in this configuration.
* Of the LCOs entered, IDENTIFY the most limiting.  
* Of the LCOs entered, IDENTIFY the most limiting.
: 3. PRE-APPROVE the WCD; ORJE changes are required, THEN IDENTIFY/ENTER the changes on theWCD. Page 2of11 JPM NUMBER: zzxxx NAME: REV NUMBER: 00 DATE: STEP STANDARD SAT/ COMMENTS NUMBER ELEMENT (*Critical Step) UNSAT (Required for (#Sequential Step) UNSAT)@ CUE: PROVIDE the operator the initiating cue; M-52-1, sheets 1 and 2; OP-AA-109-115; marked up OP-AA-109-115 FORMS 1 AND 4; AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue. START TIME: Operator determines beginning Operator determines correct step of the procedure.
: 3. PRE-APPROVE the WCD; ORJE changes are required, THEN IDENTIFY/ENTER the changes on theWCD.
beginning step to be 4.2.3. 4.2.3. Perform WCD Independent Operator reads Step. Review and Pre-Approval (Approving Supervisor)  
Page 2of11
: 1. The Approving Supervisor shall be designated by the Operations Director to approve WCDs. NOTE: Independence is maintained as Operator reads NOTE. follows:
 
JPM NUMBER:               zzxxx                         NAME:
REV NUMBER:                 00                           DATE:
STANDARD                            COMMENTS STEP                                                                         SAT/
ELEMENT                         (*Critical Step)                       (Required for NUMBER                                                                        UNSAT
(#Sequential Step)                       UNSAT)@
CUE:   PROVIDE the operator the initiating cue; M-52-1, sheets 1 and 2; OP-AA-109-115; marked up OP-AA-109-115 FORMS 1 AND 4; AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue.
START TIME:
Operator determines beginning     Operator determines correct step of the procedure.           beginning step to be 4.2.3.
4.2.3. Perform WCD Independent           Operator reads Step.
Review and Pre-Approval (Approving Supervisor)
: 1. The Approving Supervisor shall be designated by the Operations Director to approve WCDs.
NOTE:   Independence is maintained as     Operator reads NOTE.
follows:
* Do not discuss the clearance with the clearance writer until the approving supervisor has developed his or her own idea of the clearance boundary
* Do not discuss the clearance with the clearance writer until the approving supervisor has developed his or her own idea of the clearance boundary
* Use appropriate references (procedures, drawings, manuals, planning documents, etc.) *Separately assess an.d understand the work scope
* Use appropriate references (procedures, drawings, manuals, planning documents, etc.)
        *Separately assess an.d understand the work scope
* Separately assess and understand the hazards
* Separately assess and understand the hazards
* Separately walk down the work area, if needed
* Separately walk down the work area, if needed
* Mark up prints from a clean copy, especially for clearances on complex equipment where no historical/archived clearance is referenced
* Mark up prints from a clean copy, especially for clearances on complex equipment where no historical/archived clearance is referenced
* Do not read the draft boundary tag list until the above is complete 2. The Initiator and Approving Operator reads Step. Supervisor shall be different individuals and independent.
* Do not read the draft boundary tag list until the above is complete
At least one individual must be a currently licensed SRO. [CD-538E]
: 2. The Initiator and Approving Operator reads Step.
Page 3of11 JPM NUMBER: zzxxx NAME:
Supervisor shall be different individuals and independent. At least one individual must be a currently licensed SRO.
REV NUMBER: 00 DATE: STEP NUMBER ELEMENT 3. Perform the following:
[CD-538E]
-Review applicable documents and drawings.
Page 3of11
-Independently check that the WCD adequately isolates the equipment to be worked. STANDARD (*Critical Step) (#Sequential Step) Examiner Note: Only specific portions of 4.2.3.3 are being performed.  
 
*operator:
JPM NUMBER:               zzxxx                           NAME:
Reviews M-52-1 and the WCD; Determines that H1 BC BC-V205 in the closed position needs to be added to the WCD; Adds this information to the WCD. Examiner Note: Tagging Point Description is NOT critical.
                                                                    ~----------------
SAT/ UNSAT COMMENTS (Required for UNSAT)@ CUE: !f operator requests additional information to complete the Tagging Point Description, STATE exact description is not required at this time. Review applicable  
REV NUMBER:                 00                             DATE:
*operator lists the following Technical Specification on the WCD: Limiting Conditions for Operation (LCO) and ensure that potential Technical Specification
STANDARD                              COMMENTS STEP                                                                           SAT/
* Action Statements are identified.
ELEMENT                           (*Critical Step)                       (Required for NUMBER                                                                          UNSAT
TS 3.6.2.3 Action a.-One suppression pool cooling loop inoperable  
(#Sequential Step)                         UNSAT)@
-72 hr. LCO 4. !E changes are required, THEN return the tagging package to the Initiator.
: 3. Perform the following:        Examiner Note: Only specific
Examiner Note: The following Technical Specifications may be listed by are NOT critical:
              -  Review applicable        portions of 4.2.3.3 are being documents and            performed.
3.5.1.b; 3.6.2.2; 3.6.2.3; 3.6.3; 3.3.7.4; and 3.3.7.5. Operator does NOT sign for approval, and returns the package. CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME. REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
drawings.
STOP TIME: -------Task Standard:
              -  Independently check      *operator: Reviews M-52-1 and that the WCD              the WCD; Determines that H1 BC adequately isolates the  BC-V205 in the closed equipment to be          position needs to be added to worked.                  the WCD; Adds this information to the WCD.
Operator completes the required portions of the Approving Supervisor's Independent Review of the WCD in accordance with OP-AA-109-115.  
Examiner Note: Tagging Point Description is NOT critical.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments.  
CUE:   !f operator requests additional information to complete the Tagging Point Description, STATE exact description is not required at this time.
[IER L 1-11-3 Rec. 3b] Page 4of11 JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Administrative TASK NUMBER: 4000270401 2016 NRC EXAM RO/SRO-JPM A4 Copy __ of __ TASK: Respond To An Abnormal Release Of Gaseous Radioactivity JPM NUMBER: 305H-JPM.ZZ019 REVISION:
Review applicable         *operator lists the following Limiting Conditions for  Technical Specification on the Operation (LCO) and       WCD:
04 SAP BET: NOH05JPZZ19E K/A NUMBER: 2.3.11 Ability to control radiation releases. (CFR: 41.11 I 43.4 I 45.10) ALTERNATE PATH: D APPLICABILITY: IMPORTANCE FACTOR: RO: 3.8 SRO: 4.3 EVALUATION SETTING/METHOD:
ensure that potential Technical Specification
Simulator/Perform  
* TS 3.6.2.3 Action Statements are          Action a.-One suppression identified.                    pool cooling loop inoperable -
72 hr. LCO Examiner Note: The following Technical Specifications may be listed by are NOT critical:
3.5.1.b; 3.6.2.2; 3.6.2.3; 3.6.3; 3.3.7.4; and 3.3.7.5.
: 4.  !E changes are required,      Operator does NOT sign for THEN return the tagging      approval, and returns the package.
package to the Initiator.
CUE:   WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.
REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
STOP TIME: - - - - - - -
Task Standard: Operator completes the required portions of the Approving Supervisor's Independent Review of the WCD in accordance with OP-AA-109-115.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]
Page 4of11
 
JOB PERFORMANCE MEASURE STATION: Hope Creek                               2016 NRC EXAM                       Copy _ _ of _ _
RO/SRO-JPM A4 SYSTEM:  Administrative TASK NUMBER:    4000270401 TASK: Respond To An Abnormal Release Of Gaseous Radioactivity JPM NUMBER: 305H-JPM.ZZ019                                                 REVISION: 04 SAP BET: NOH05JPZZ19E K/A NUMBER:   2.3.11 Ability to control radiation releases. (CFR: 41.11 I 43.4 I 45.10)
IMPORTANCE FACTOR:           RO: 3.8     SRO: 4.3 ALTERNATE PATH:    D APPLICABILITY:                    RO~                                  SRO~
EVALUATION SETTING/METHOD: Simulator/Perform


==REFERENCES:==
==REFERENCES:==
HC.OP-AB.CONT-0004, Rev. 6              HC.OP-DL.ZZ-0026, Rev. 152 TOOLS, AND EQUIPMENT:      Calculator ESTIMATED COMPLETION TIME:                      Minut~s TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:                    N/A    Minutes JPM PERFORMED BY:                                                    GRADE: SAT      D      UNSAT D ACTUAL COMPLETION TIME:        - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME:                  N/A
                                                                                    --    - - Minutes REASON IF UNSATISFACTORY:
EVALUATOR:                                                                DATE:
Signature Page 1 of 10


HC.OP-AB.CONT-0004, Rev. 6 HC.OP-DL.ZZ-0026, Rev. 152 TOOLS, AND EQUIPMENT:
JOB PERFORMANCE MEASURE SYSTEM:     Administrative TASK NUMBER:       4000270401 TASK:   Respond To An Abnormal Release Of Gaseous Radioactivity INITIAL CONDllTONS:
Calculator ESTIMATED COMPLETION TIME: 10
: 1. North Plant Vent (NPV) Stack radiation monitoring activity was rising on RM-11 point 9RX590.
----TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: Minutes ----ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes ----REASON IF UNSATISFACTORY:
: 2. SPDS is unavailable.
EVALUATOR:
: 3. HC.OP-AB.CONT-0004 is being executed to determine and stop the release of activity.
DATE: Signature Page 1 of 10 JOB PERFORMANCE MEASURE SYSTEM: Administrative TASK NUMBER: 4000270401 TASK: Respond To An Abnormal Release Of Gaseous Radioactivity INITIAL CONDllTONS:  
: 4. NPV Exh Flow instrumentation channel 9AX300 is inoperable. Flow is being estimated in accordance with HC.OP-DL.ZZ-0026(Q), Attachment 3u (Provided).
: 1. North Plant Vent (NPV) Stack radiation monitoring activity was rising on RM-11 point 9RX590. 2. SPDS is unavailable.  
: 5. Monitor Item 136 display is 001.
: 3. HC.OP-AB.CONT-0004 is being executed to determine and stop the release of activity.  
INITIATING CUE:
: 4. NPV Exh Flow instrumentation channel 9AX300 is inoperable.
DETERMINE the Release Rate of NOBLE GAS from the NPV in accordance with HC.OP-AB.CONT-0004, Action A.4.
Flow is being estimated in accordance with HC.OP-DL.ZZ-0026(Q), Attachment 3u (Provided).  
Page 2of10
: 5. Monitor Item 136 display is 001. INITIATING CUE: DETERMINE the Release Rate of NOBLE GAS from the NPV in accordance with HC.OP-AB.CONT-0004, Action A.4. Page 2of10 JPM NUMBER: ZZ019 NAME:
 
REV NUMBER: 04 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT) CUE: PROVIDE the operator the initiating cue; HC.OP-DL.ZZ-0026(0), Attachment 3u; AND ENTER START TIME AFTER Operator repeats back the Initiating Cue. START TIME: Operator obtains the correct Operator obtains procedure procedure.
JPM NUMBER:   ~~~~~~~~~~
HC.OP-AB.CONT-0004.
ZZ019                               NAME:
Operator determines beginning Operator determines correct step of the procedure.
REV NUMBER:                 04                                 DATE:
beginning step to be A.4 A.4 DETERMINE the Total Release Operator determines that to Rates of Noble Gas and Iodine calculate the Noble Gas release as follows: from the NPV the formula in Table "A" must be used.
(*Critical Step)                               COMMENTS STEP                                                                                      SAT/
* USE the SPDS Noble Gas Total. OR
ELEMENT                             (#Sequential Step)                               (Required for NUMBER                                                                                    UNSAT STANDARD                                       UNSAT)
* USE one of the Formulas in Table "A". I IF the emuent (&#xb5;Ci/see) channel on the RM-11 is NOT operatmg for a specJfJc plant vent, THEN CALCULATE the Noble Gas release rate for that vent usin<i the following x x 472 = &#xb5;Ci/cc ) Plant Vent Exh &#xb5;Ci/sec (n.g.) Flow m cfm Where: &#xb5;Ci!cc (n.g.) The concentration of Noble Gas obtained from the RM-11 (the operable channel is indicated on monitor Item 136 at RM-23A .. ) OR from an actual sample of the plant vent 472 The conversion factor in units of cclsecJcfm  
CUE: PROVIDE the operator the initiating cue; HC.OP-DL.ZZ-0026(0), Attachment 3u; AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.
&#xb5;Ci/sec (n.g.) The calculated release rate from the specJfJed plant vent (Noble Gas) .. Monitor Item 136 display: {This monitor item is not accessible from the RM-11 ) 001 = Channel 1, low Range 002 = Channel 2, Mid Range 003 =Channel 3, High Range Operator manipulates the RM-11 terminal to obtain the value of NPV Noble Gas release from the 9RX602 Low Range detector and enters the value into the formula. *3.65E-5 uCi/cc. Page 3of10 JPM NUMBER: ZZ019 NAME:
START TIME:
REV NUMBER: 04 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT) Operator transfers the Plant Vent Exh Flow value from Attachment 3u of HC.OP-DL.ZZ-0026 (provided).  
Operator obtains the correct         Operator obtains procedure procedure.                             HC.OP-AB.CONT-0004.
*49613.9 CFM (49614 CFM acceptable)
Operator determines beginning         Operator determines correct step of the procedure.                 beginning step to be A.4 A.4 DETERMINE the Total Release           Operator determines that to Rates of Noble Gas and Iodine         calculate the Noble Gas release as follows:                           from the NPV the formula in Table "A" must be used.
Operator calculates the NPV Noble Gas release rate. Calculated Value = 3.65E-5 &#xb5;Ci/cc
* USE the SPDS Noble Gas Total.
OR
* USE one of the Formulas in Table "A".                                                                 I IF the emuent (&#xb5;Ci/see) channel on the RM-11 is NOT operatmg for a specJfJc plant vent, THEN CALCULATE the Noble Gas release rate for that vent usin<i the following x                     x   472   =
                          &#xb5;Ci/cc     )     Plant Vent Exh                   &#xb5;Ci/sec (n.g.)
Flow m cfm Where:
                                &#xb5;Ci!cc (n.g.)     The concentration of Noble Gas obtained from the RM-11 (the operable channel is indicated on monitor Item 136 at RM-23A.. )
OR from an actual sample of the plant vent 472               The conversion factor in units of cclsecJcfm
                                &#xb5;Ci/sec (n.g.)     The calculated release rate from the specJfJed plant vent (Noble Gas)
          .. Monitor Item 136 display: {This monitor item is not accessible from the RM-11 )
                    =
001 Channel 1, low Range
                    =
002 Channel 2, Mid Range 003 =Channel 3, High Range Operator manipulates the RM-11 terminal to obtain the value of NPV Noble Gas release from the 9RX602 Low Range detector and enters the value into the formula.
                                              *3.65E-5 uCi/cc.
Page 3of10
 
JPM NUMBER:             ZZ019                           NAME:   ~~~~~~~~~~~~~~~~-
REV NUMBER:                 04                           DATE:
(*Critical Step)                     COMMENTS STEP                                                                        SAT/
ELEMENT                         (#Sequential Step)                     (Required for NUMBER                                                                        UNSAT STANDARD                               UNSAT)
Operator transfers the Plant Vent Exh Flow value from Attachment 3u of HC.OP-DL.ZZ-0026 (provided).
                                            *49613.9 CFM (49614 CFM acceptable)
Operator calculates the NPV Noble Gas release rate.
Calculated Value =
3.65E-5 &#xb5;Ci/cc
* 49613.9 CFM
* 49613.9 CFM
* 472= *854.7 &#xb5;Ci/sec(+
* 472=
0.5) CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.
                                            *854.7 &#xb5;Ci/sec(+ 0.5)
BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
CUE:   WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.
STOP TIME: Task Standard:
RE~EAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
Operator calculates the Release Rate of NOBLE GAS from the NPV in accordance with HC.OP-AB.CONT-0004, Action A.4. Page 4of10 JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Emergency Procedures/Plan TASK NUMBER: 2000500302/2000020505 2016 NRC EXAM SRO-JPM AS Copy __ of __ TASK: Utilize The ECG To Determine The Emergency Classification And/Or Reportability Of An Event And/Or Plant Condition JPM NUMBER: 305H-JPM.ECG006 REVISION:
STOP TIME:
10 SAP BET: NOH05JPCL06E KIA NUMBER: 2.4.38 Ability to take actions called for in the facility emergency plan, including I supporting or acting as emergency coordinator if required. (CFR: 41.10 I 43.5 I 45.11) ALTERNATE PATH: D APPLICABILITY:
Task Standard: Operator calculates the Release Rate of NOBLE GAS from the NPV in accordance with HC.OP-AB.CONT-0004, Action A.4.
IMPORTANCE FACTOR: RO: 2.4 SRO: 4.4 EVALUATION SETTING/METHOD:
Page 4of10
Classroom(Simulator)/Perform  
 
JOB PERFORMANCE MEASURE STATION:   Hope Creek                                 2016 NRC EXAM                        Copy _ _ of _ _
SRO-JPM AS SYSTEM:   Emergency Procedures/Plan TASK NUMBER:     2000500302/2000020505 TASK: Utilize The ECG To Determine The Emergency Classification And/Or Reportability Of An Event And/Or Plant Condition JPM NUMBER: 305H-JPM.ECG006                                                     REVISION: 10 SAP BET:   NOH05JPCL06E KIA NUMBER:     2.4.38   Ability to take actions called for in the facility emergency plan, including I supporting or acting as emergency coordinator if required. (CFR: 41.10 I 43.5 I 45.11)
IMPORTANCE FACTOR:             RO: 2.4       SRO: 4.4 ALTERNATE PATH:    D APPLICABILITY:                                                                SRO~
EVALUATION SETTING/METHOD:           Classroom(Simulator)/Perform


==REFERENCES:==
==REFERENCES:==
EP-HC-111-100 Rev.18                      EP-HC-111-101 Rev.1 EAL Flowcharts and EAL Wallcharts        HCGS ECG - EAL Technical Basis TOOLS, AND EQUIPMENT:        EP-HC-111-F*[1-5, 24]; EP-HC-111-101; EAL Flowcharts and EAL Wallcharts:
HCGS ECG - EAL Technical Basis; Phone with EP Aid-031-Simulator Only.
ESTIMATED COMPLETION TIME:                  16
                                                                                      ---        - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: - -15/13              - - - Minutes JPM PERFORMED BY:                                                          GRADE: SAT    D        UNSAT  D ACTUAL COMPLETION TIME:
                                                                                      - - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME:              - - - - - Minutes REASON IF UNSATISFACTORY:
EVALUATOR:                                                                DATE:
Signature Page 1of16


EP-HC-111-100 Rev.18 EP-HC-111-101 Rev.1 EAL Flowcharts and EAL Wallcharts HCGS ECG -EAL Technical Basis TOOLS, AND EQUIPMENT:
JOB PERFORMANCE MEASURE SYSTEM:       Emergency Procedures/Plan TASK NUMBER:         2000500302/2000020505 TASK:     Utilize The ECG To Determine The Emergency Classification And/Or Reportability Of An Event And/Or Plant Condition INITIAL CONDllTONS:
EP-HC-111-F*[1-5, 24]; EP-HC-111-101; EAL Flowcharts and EAL Wallcharts:
: 1. The plant was operating at 100% power with Plant Effluent activity of:
HCGS ECG -EAL Technical Basis; Phone with EP Aid-031-Simulator Only. ' ESTIMATED COMPLETION TIME: 16 Minutes -----TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: 15/13 Minutes -----JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: Minutes -----ACTUAL TIME CRITICAL COMPLETION TIME: Minutes -----REASON IF UNSATISFACTORY:
EVALUATOR:
DATE: Signature Page 1of16 JOB PERFORMANCE MEASURE SYSTEM: Emergency Procedures/Plan TASK NUMBER: 2000500302/2000020505 TASK: Utilize The ECG To Determine The Emergency Classification And/Or Reportability Of An Event And/Or Plant Condition INITIAL CONDllTONS:
1 . The plant was operating at 100% power with Plant Effluent activity of:
* 1.17E+01 &#xb5;Ci/sec Noble Gas
* 1.17E+01 &#xb5;Ci/sec Noble Gas
* 1.1 ?E-02 &#xb5;Ci/sec 1-131 2. Hope Creek experienced an earthquake which indicated a magnitude of> 0.1g. 3. The earthquake was felt inside the Main Control Room. 4. Control Room Annunciator C6-C4 (SEISMIC MON PNL C673) is in alarm. 5. ON Panel 1 OC673:
* 1.1 ?E-02 &#xb5;Ci/sec 1-131
: 2. Hope Creek experienced an earthquake which indicated a magnitude of> 0.1g.
: 3. The earthquake was felt inside the Main Control Room.
: 4. Control Room Annunciator C6-C4 (SEISMIC MON PNL C673) is in alarm.
: 5. ON Panel 1OC673:
* The SMA-3 Event Indicator is White.
* The SMA-3 Event Indicator is White.
* The Strong Motion Accelerograph Tape Machines have advanced but are not currently running.
* The Strong Motion Accelerograph Tape Machines have advanced but are not currently running.
* The AMBER alarm light on the Seismic Switch Power Supply Drawer is lit. 6. Numerous amber lights and 3 red lights are lit on the response Seismic Response Spectrum Annunciator.  
* The AMBER alarm light on the Seismic Switch Power Supply Drawer is lit.
: 7. A LOCA results. The Reactor is successfully scrammed, with RPV level dropping rapidly to -250"; then stabilizing between -225" and -205'', and being maintained using all available ECCS (2 LPCI Loops only). 8. Drywell Pressure peaked at 44 psig, then dropped to < 2 psig over the next 90 seconds, and continues to slowly drop. 9. The current 33 ft. elevation wind direction is from 163&deg; at 11 mph. 10. Plant Effluent activity is:
: 6. Numerous amber lights and 3 red lights are lit on the response Seismic Response Spectrum Annunciator.
: 7. A LOCA results. The Reactor is successfully scrammed, with RPV level dropping rapidly to -250"; then stabilizing between -225" and -205'', and being maintained using all available ECCS (2 LPCI Loops only).
: 8. Drywell Pressure peaked at 44 psig, then dropped to < 2 psig over the next 90 seconds, and continues to slowly drop.
: 9. The current 33 ft. elevation wind direction is from 163&deg; at 11 mph.
: 10. Plant Effluent activity is:
* 1.17E+01 &#xb5;Ci/sec Noble Gas
* 1.17E+01 &#xb5;Ci/sec Noble Gas
* 1.1 ?E-02 &#xb5;Ci/sec 1-131 11. DAPA monitors indicate:
* 1.1 ?E-02 &#xb5;Ci/sec 1-131
: 11. DAPA monitors indicate:
* 2.000E+OO DAPA A
* 2.000E+OO DAPA A
* 1.500E+OO DAPA B INITIATING CUE: Based on this information, CLASSIFY this event AND MAKE the initial notifications.
* 1.500E+OO DAPA B INITIATING CUE:
Based on this information, CLASSIFY this event AND MAKE the initial notifications.
This is a time critical task, and has two time critical elements.
This is a time critical task, and has two time critical elements.
Time zero for the event is NOW. Page 2of16 JPM NUMBER: ECG006 NAME:
Time zero for the event is NOW.
REV NUMBER: 10 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ CUE: PROVIDE the operator the initiating cue AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue. START TIME: EP-HC-111-101
Page 2of16


===8.4 Classification===
JPM NUMBER:    ~~~~~~~~~~
ECG006                            NAME:    ~~~~~~~~~~~~~~~~~
REV NUMBER:                  10                              DATE:
(*Critical Step)            COMMENTS STEP                                                                          SAT/
ELEMENT                        (#Sequential Step)              (Required for NUMBER                                                                        UNSAT STANDARD                    UNSAT)@
CUE:    PROVIDE the operator the initiating cue AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue.
START TIME:
EP-HC-111-101 8.4   Classification                                       N/A              N/A      N/A NOTE    Comparison of redundant          Operator reads Note.
instrumentation, indications, and/or alarms should be used to confirm actual plant conditions.
The primary tools for            Operator reads text.
determining the emergency classification level are the EAL flowcharts or EAL wallcharts.
The user of the EAL flowcharts or wallcharts may (but is not                                  '
required to) consult the EAL Technical Basis in order to obtain additional information concerning the EALs under classification consideration. To use the EAL flowcharts or wallcharts, follow this sequence:
: 1. ASSESS the event and/or      Operator assesses the initial plant conditions and        conditions, and determines that DETERMINE which ECG -        EALs that are applicable under all EAL Group/Section is most    plant Operational Conditions appropriate.                (OPCONs), AND EALs applicable only under hot OPCONs apply to this classification.
: 2. REVIEW EAL categories        Operator assesses the initial and subcategories on the    conditions, and determines that H, appropriate                  and R, are appropriate ECG flowcharts/wallcharts.      categories; and H1, and R1 are appropriate subcategories.
Page 3of16


N/A N/A N/A NOTE Comparison of redundant Operator reads Note. instrumentation, indications, and/or alarms should be used to confirm actual plant conditions.
JPM NUMBER:              ECG006                        NAME:
The primary tools for Operator reads text. determining the emergency classification level are the EAL flowcharts or EAL wallcharts.
REV NUMBER:                  10                          DATE:
The user of the EAL flowcharts or wallcharts may (but is not ' required to) consult the EAL Technical Basis in order to obtain additional information concerning the EALs under classification consideration.
(*Critical Step)                COMMENTS STEP                                                                          SAT/
To use the EAL flowcharts or wallcharts, follow this sequence:
ELEMENT                      (#Sequential Step)                (Required for NUMBER                                                                        UNSAT STANDARD                        UNSAT)@
: 1. ASSESS the event and/or Operator assesses the initial plant conditions and conditions, and determines that DETERMINE which ECG -EALs that are applicable under all EAL Group/Section is most plant Operational Conditions appropriate. (OPCONs), AND EALs applicable only under hot OPCONs apply to this classification.  
: 3. If using the ECG - EAL      Operator refers to Flowchart flowcharts, for each        Diagrams and/or Wallcharts and applicable subcategory,      reviews EALs in H1, and R1.
: 2. REVIEW EAL categories Operator assesses the initial and subcategories on the conditions, and determines that H, appropriate and R, are appropriate ECG flowcharts/wallcharts.
REVIEW EALs in the subcategory beginning with  Operator determines that HA 1.1 ,
categories; and H1, and R1 are appropriate subcategories.
the lowest emergency         and HU1 .1 apply to the event.
Page 3of16 JPM NUMBER: ECG006 NAME: REV NUMBER: 10 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ 3. If using the ECG -EAL Operator refers to Flowchart flowcharts, for each Diagrams and/or Wallcharts and applicable subcategory, reviews EALs in H1, and R1. REVIEW EALs in the Operator determines that HA 1 .1 , subcategory beginning with the lowest emergency and HU1 .1 apply to the event. classification level to the highest classification level (left to right). ENSURE all pages of a particular subcategory being considered are reviewed.
classification level to the highest classification level (left to right). ENSURE all pages of a particular subcategory being considered are reviewed.
: 4. If using the ECG -EAL Wallcharts, for each applicable subcategory, REVIEW EALs in the subcategory beginning with the highest emergency classification level to the lowest classification level ' (left to right). 5. If in OPCON 1, 2 or 3, also REVIEW the Fission Product Barrier (FPB) Table: a. EXAMINE the FPB Operator examines the FPB categories in the left categories in the left column of the column of the table. table. b. SELECT the category Operator selects categories RPV that most likely Level; and RPV/Drywell Pressure coincides with event /Temperature/H2
: 4. If using the ECG - EAL Wallcharts, for each applicable subcategory, REVIEW EALs in the subcategory beginning with the highest emergency classification level to the lowest classification level
& 02 Levels most conditions.
  '        (left to right).
likely coincide with event conditions.
: 5. If in OPCON 1, 2 or 3, also REVIEW the Fission Product Barrier (FPB)
: c. REVIEW all thresholds Operator reviews all thresholds in in this category for each of the categories identified in each fission product 5.b for each fission product barrier, barrier. and determines FB1 .L, RB1 .L, RB2.L, and CB1 .L apply to this event. Page 4of16 JPM NUMBER: ECG006 NAME:
Table:
REV NUMBER: 10 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ d. For each threshold that Operator proceeds to the FPB is exceeded, IDENTIFY Table to determine the point values its point value and and classification level. DETERMINE the classification level in accordance with the instructions on the Fission Product Barrier Table (or in EAL Technical Bases, Attachment 1 ). Hope Creek-Fission Product Barrier Table NOTE1 The Primary Containment Operator reads NOTE. Barrier should not be declared lost or potentially lost based on exceeding Technical Specification action statement criteria, unless there is an event in progress requiring
: a. EXAMINE the FPB        Operator examines the FPB categories in the left categories in the left column of the column of the table. table.
' mitigation by the Primary Containment barrier. When no event is in progress (Loss or Potential Loss of either Fuel Clad and/or RCS barrier) the Primary Containment Barrier status is addressed by Technical Specifications.
: b. SELECT the category    Operator selects categories RPV that most likely      Level; and RPV/Drywell Pressure coincides with event  /Temperature/H2 & 02 Levels most conditions.            likely coincide with event conditions.
Page 5of16 JPM NUMBER: ECG006 REV NUMBER: 10 STEP NUMBER ELEMENT Use of Fjssion Product Barrier Table A point system is used lo dotennine the Emergency Classification Level based on the Fission Product Barrier Table. Each Fission Product Barrier Loss and Poteotial loss threshold is assigned a point value as noted below. Perform the IOllowing
: c. REVIEW all thresholds  Operator reviews all thresholds in in this category for  each of the categories identified in each fission product  5.b for each fission product barrier, barrier.               and determines FB1 .L, RB1 .L, RB2.L, and CB1 .L apply to this event.
: 1. Review all columns of the Fission Product Barrier Table and identify which need further review. 2. For each of the three barriers, detem1ine the EAL with the highest point value. No more than one EAL should be selected for each barrier 3. Add the point values for the three barriers.  
Page 4of16
: 4. Classify based on the point value sum as follows. Ms:um ... ::. 3 Emergency Acbon levels {EAls) $l7E AREA \...oss or lass EMERGENCY c' ANY -barn"" 1--0SS r:l ANY two C-ENE?.A:..
 
EME?GENCY AliQ Loss ECG ATT# NAME: DATE: (*Critical Step) (#Sequential Step) STANDARD Operator identifies the point values FB1 .L = 5 points, RB1 .L(OR RB2.L) = 5 points, and CB1 .L = 3 points. *operator adds the values, for a total of: 13 points -General Emergency.
JPM NUMBER:    ~~~~~~~~~~
Examiners Note: Determining this value for future use is critical; marking it on the FPB Table is not. Page 6of16 SAT/ UNSAT COMMENTS (Required for UNSAT JPM NUMBER: ECG006 NAME:
ECG006                        NAME:
REV NUMBER: 10 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ EP-HC-111-101
REV NUMBER:                    10                          DATE:
: 6. REVIEW the associated Operator reviews the EALs EALs as com pared to the identified in Step 8.4.3 and 4, and event and SELECT the selects EAL HA 1.1 as the highest highest appropriate emergency action level met or emergency.
(*Critical Step)               COMMENTS STEP                                                                          SAT/
If identification exceeded (ALERT). However, the of an EAL is questionable classification determined by the refer to paragraph 8.1 FPB Table (GENERAL above. EMERGENCY) is the highest. If there is any doubt with regard to assessment of a particular EAL, the ECG EAL Technical Bases Document should be reviewed.
ELEMENT                      (#Sequential Step)              (Required for NUMBER                                                                          UNSAT STANDARD                      UNSAT)@
Words contained in an EAL that appear in uppercase and bold print (e.g., VALID) are defined at the end of the bases for the particular EAL or ECG -EAL Technical Basis Document, Attachment 3, EP-HC-111-232, EAL Definitions.
: d. For each threshold that Operator proceeds to the FPB is exceeded, IDENTIFY  Table to determine the point values its point value and    and classification level.
Words or numbers contained in an EAL that are in bold print but not uppercase are EAL threshold values (e.g., ;;,::: 15 minutes).  
DETERMINE the classification level in accordance with the instructions on the Fission Product Barrier Table (or in EAL Technical Bases, Attachment 1).
: 7. If an EAL has been Examiner Note: Filling out the exceeded, equal level NRG Data Sheet is beyond the EALs or lower level EALs scope of this JPM. are not required to be seperately reported as long as the applicable N/A information is communicated to the NRG using ECG Attachment 5, EP-HC-111-F5, NRC Data Sheet & Completion Reference.
Hope Creek-Fission Product Barrier Table NOTE1    The Primary Containment          Operator reads NOTE.
Page 7of16 JPM NUMBER: ECG006 NAME: REV NUMBER: 10 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ 8. When the Shift Manager Operator requests STA/IA (SM) is the Emergency verification of classification.
Barrier should not be declared lost or potentially lost based on exceeding Technical Specification action statement criteria, unless there is an event in progress requiring              '
Coordinator, the Shift Examiner Note: Due to time spent Technical Advisor (STA} is responsible to perform an assessing and/or nature of JPM independent verification of administration, Operator may not the EAL classification.
mitigation by the Primary Containment barrier. When no event is in progress (Loss or Potential Loss of either Fuel Clad and/or RCS barrier) the Primary Containment Barrier status is addressed by Technical Specifications.
The request verification.
Page 5of16
ST A verification does not alleviate the requirement of the SM to make a timely classification.
 
Should the SM fill the STA role, independent verification of the EAL classification will be delegated to another on-shift SRO, the Independent Assessor.
JPM NUMBER:                        ECG006                                        NAME:
CUE: IF the Operator requests the STA/IA to independently verify the EAL Classification, THEN INFORM the Operator the STA/IA is not available.  
REV NUMBER:                                10                                    DATE:
' 9. IDENTIFY and Operator identifies and implements IMPLEMENT the EP-HC-111-F4, and refers to EP-referenced ECG form HC-111-102 as a guide for correct based on the Emergency description wording for entry on the Classification Level. ICMF for all EALs.
(*Critical Step)              COMMENTS STEP                                                                                                  SAT/
* Un:..1sual Event lmpletn*'nt EP*+IC 111 .f 1
ELEMENT                                        (#Sequential Step)              (Required for NUMBER                                                                                                UNSAT STANDARD                      UNSAT Use of Fjssion Product Barrier Table A point system is used lo dotennine the Emergency Classification Level based on the Fission Product Barrier Table. Each Fission Product Barrier Loss and Poteotial loss threshold is assigned a point value as noted below.
* Alert lmp!ernent EP*tiC, l l 1-F2
Perform the IOllowing
* site Area Emergency lmplemenl EP-HC-l 11-F3
: 1. Review all columns of the Fission Product Barrier Table and identify which need further review.
* General E:.mergency lmpfen1ent
: 2. For each of the three barriers, detem1ine the EAL with the highest point value. No more than one EAL should be selected for each barrier Operator identifies the point values
* unusual Event (Common Site) Implement EP-HC-111-F24 REFER to EP-HC-111-102, Hope Creek Emergency Classification Description Table, as a guide for correct description wording for entry on the Initial Contact Message Form (ICMF) for all EALs. EP-HC-111-F4 ATTACHMENT 4 GENERAL EMERGENCY A. CLASSIFICATION
: 3. Add the point values for the three barriers.
: 1. CALL communicators to Operator calls communicators to the Control Room. the Control Room and initials Step. CUE: After 2 minutes, report as the Primary and Secondary Communicators.
FB1 .L = 5 points, RB1 .L(OR
Page 8of16 JPM NUMBER: ECG006 NAME:
: 4. Classify based on the point value sum as follows.
REV NUMBER: 10 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ 2. IF a Security Event is in Operator determines Step is not progress, THEN applicable and marks Step N/A. IMPLEMENT the prompt actions of NC.EP-EP.ZZ-0102, EC Response, Attachment 10, prior to classification.  
RB2.L) =5 points, and CB1 .L = 3 points.
: 3. If time allows, DIRECT Operator requests ST A/IA Classification Independent verification of classification and Verification to be initials Step. performed Examiner Note: Due to time spent assessing and/or nature of JPM administration, Operator may not request a verification.
R.~f@rto Ms:um                    Emergency Acbon levels {EAls)        ECG ATT#
CUE: IF the Operator requests the STA/IA to independently verify the EAL Classification, THEN INFORM the Operator the STA/IA is not available.  
                                                                  *operator adds the values, for a total of:
: 4. ; After Classification Operator commences filling out Independent Verification ICMF and initials Step. is obtained:
::. 3                                                  13 points - General Emergency.
DECLARE the *operator declares a General
Examiners Note: Determining this value for future use is critical; marking it on the FPB Table is not.
* Emergency, places time and GENERAL date in the appropriate spots in the EMERGENCY (enter ICMF, time and date on ICMF) and initials the step as the EC. Examiners Note: NOTE the declaration time that the operator entered on the ICMF. The difference between the ST ART TIME and the "DECLARED AT" TIME is the first critical time (15 min). Time: Page 9of16 JPM NUMBER: ECG006 NAME:
                    $l7E AREA    \...oss or po~tal  lass EMERGENCY c' ANY -          barn""
REV NUMBER: 10 DATE: I (*Critical Step) COMMENTS STEP SAT/ NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@
1--0SS r:l ANY two C-ENE?.A:.. l>arni"">-
* COMPLETE I *operator places the EAL #(s): APPROVE the ICMF FB1.L, RB1.L(OR RB2.L) and CB1 .L, a description of the event, checks NO Release in progress, enters the wind direction and speed, determines PAR, and initials as EC in the appropriate spots in the ICMF, and initials the step as the EC. Examiners Note: See the attached ICMF for an example of what the form should look like when filled out properly.
EME?GENCY AliQ Loss Page 6of16
Note that the exact words do not have to be in the "DESCRIPTION OF EVENT", but the description must convey the sense of the Initiating Condition for EALs FB1 .L, RB1 .L(OR RB2.L), and CB1 .L. The operator may place the Examiner.'s name as the Communicator, or tell the Examiner to place his/her name as the Communicator.  
 
: 5. If time allows OBTAIN Operator requests ST A/IA perform accuracy peer check of the an accuracy peer check of the completed ICMF completed ICMF. CUE: IF the Operator requests the STA/IA to perform an. accuracy peer check of the completed ICMF, THEN INFORM the Operator the STA/IA is not available.
JPM NUMBER:               ECG006                                NAME:     ~~~~~~~~~~~~~~~~~
: 6. Continue with NOTIFICATION AND ACTIVATION as follows: Operator activates the ERO per posted instructions titled Training
REV NUMBER:                 10                                DATE:
* If not previously Use Emergency Callout Activation performed, ACTIVATE and initials Step. I DIRECT Examiner Note: ENSURE the ACTIVATION of ERO Emergency Callout operator is using the Simulator (EP 96-003) Training Activation instructions.
(*Critical Step)             COMMENTS STEP                                                                              SAT/
CUE: If asked/requested to activate the ERO Emergency Callout, ST ATE "The ERO Callout is complete." Page 10of16 JPM NUMBER: ECG006 NAME:
ELEMENT                            (#Sequential Step)              (Required for NUMBER                                                                              UNSAT STANDARD                      UNSAT)@
REV NUMBER: 10 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@
EP-HC-111-101
* DIRECT the Primary *operator provides the ICMF to Communicator to Primary Communicator and implement ECG directs implementation of Att.6 Attachment 6 and initials Step. Examiner Note: The difference between the "DECLARED AT" TIME and this LOG TIME is the second critical time (13 min.). Time: CUE: Role-play as Primary Communicator and repeat back the directions given.
: 6. REVIEW the associated            Operator reviews the EALs EALs as com pared to the          identified in Step 8.4.3 and 4, and event and SELECT the              selects EAL HA 1.1 as the highest highest appropriate              emergency action level met or emergency. If identification      exceeded (ALERT). However, the of an EAL is questionable        classification determined by the refer to paragraph 8.1            FPB Table (GENERAL above.                           EMERGENCY) is the highest.
* DIRECT the Secondary
If there is any doubt with regard to assessment of a particular EAL, the ECG EAL Technical Bases Document should be reviewed. Words contained in an EAL that appear in uppercase and bold print (e.g., VALID) are defined at the end of the bases for the particular EAL or i~ ECG -
*operator directs CM2 to Communicator to implement Att. 8 for a GENERAL implement ECG EMERGENCY Attachment 8 for a GENERAL and initials Step. EMERGENCY CUE: Role-play as Secondary Communicator and repeat back the directions given. Provide Terminating Cue. CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME. REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
EAL Technical Basis Document, Attachment 3, EP-HC-111-232, EAL Definitions. Words or numbers contained in an EAL that are in bold print but not uppercase are EAL threshold values (e.g., ; ,: : 15 minutes).
STOP TIME: Task Standard:
: 7. If an EAL has been                Examiner Note: Filling out the exceeded, equal level            NRG Data Sheet is beyond the EALs or lower level EALs          scope of this JPM.
Operator declares a General Emergency in accordance with EALs FB1 .L, RB1 .L(OR RB2.L), and CB1 .L; initiates a PAR; and makes notifications within identified Critical Times in accordance with EP-HC-111-101.
are not required to be seperately reported as long as the applicable N/A information is communicated to the NRG using ECG Attachment 5, EP-HC-111-F5, NRC Data Sheet & Completion Reference.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments.
Page 7of16
[IER L 1-11-3 Rec. 3b] Page 11of16 '
 
JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Control Rod and Drive Mechanism TASK NUMBER: 4000040401 TASK: Respond To An Uncoupled Control Rod JPM NUMBER: 305H-JPM.BF011 SAP BET: NOH05JPBF11 E 2016 NRC EXAM JPMA Copy __ of __ REVISION:
JPM NUMBER:                        ECG006                                            NAME:
04 KIA NUMBER: 201003 A2. Ability to (a) predict the impacts of the following on the CONTROL ROD AND DRIVE MECHANISM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR: 41.5 I 45.6) ALTERNATE PATH: C8J APPLICABILITY:
REV NUMBER:                             10                                          DATE:
A2.02 Uncoupled rod RO C8J IMPORTANCE FACTOR: RO: 3.7 SRO: 3.8 SRO C8J EVALUATION SETTING/METHOD:
(*Critical Step)                COMMENTS STEP                                                                                                      SAT/
Simulator/Perform  
ELEMENT                                          (#Sequential Step)                (Required for NUMBER                                                                                                    UNSAT STANDARD                        UNSAT)@
: 8.     When the Shift Manager                            Operator requests STA/IA (SM) is the Emergency                            verification of classification.
Coordinator, the Shift Technical Advisor (STA} is                        Examiner Note: Due to time spent responsible to perform an                        assessing and/or nature of JPM independent verification of                      administration, Operator may not the EAL classification. The                      request verification.
STA verification does not alleviate the requirement of the SM to make a timely classification. Should the SM fill the STA role, independent verification of the EAL classification will be delegated to another on-shift SRO, the Independent Assessor.
CUE:  IF the Operator requests the STA/IA to independently verify the EAL Classification, THEN INFORM the Operator the STA/IA is not available.
: 9.      IDENTIFY and                                      Operator identifies and implements IMPLEMENT the                                     EP-HC-111-F4, and refers to EP-referenced ECG form                              HC-111-102 as a guide for correct based on the Emergency                            description wording for entry on the Classification Level.                            ICMF for all EALs.
* Un:..1sual Event            lmpletn'nt EP*+IC 111 .f 1
* Alert                      lmp!ernent EP*tiC, l l 1-F2
* site Area Emergency          lmplemenl EP-HC-l 11-F3
* General E:.mergency        lmpfen1ent [P.HC-111-r~
* unusual Event (Common Site) Implement EP-HC-111-F24 REFER to EP-HC-111-102, Hope Creek Emergency Classification Description Table, as a guide for correct description wording for entry on the Initial Contact Message Form (ICMF) for all EALs.
EP-HC-111-F4 ATTACHMENT 4 GENERAL EMERGENCY A.        CLASSIFICATION
: 1.      CALL communicators to                            Operator calls communicators to the Control Room.                                the Control Room and initials Step.
CUE:   After 2 minutes, report as the Primary and Secondary Communicators.
Page 8of16
 
JPM NUMBER:              ECG006                          NAME:    ~~~~~~~~~~~~~~~~~
REV NUMBER:                  10                           DATE:
(*Critical Step)                   COMMENTS STEP                                                                          SAT/
ELEMENT                       (#Sequential Step)                   (Required for NUMBER                                                                        UNSAT STANDARD                           UNSAT)@
: 2. IF a Security Event is in    Operator determines Step is not progress, THEN              applicable and marks Step N/A.
IMPLEMENT the prompt actions of NC.EP-EP.ZZ-0102, EC Response, Attachment 10, prior to classification.
: 3. If time allows, DIRECT      Operator requests STA/IA Classification Independent  verification of classification and Verification to be            initials Step.
performed Examiner Note: Due to time spent assessing and/or nature of JPM administration, Operator may not request a verification.
CUE:  IF the Operator requests the STA/IA to independently verify the EAL Classification, THEN INFORM the Operator the STA/IA is not available.
: 4. ; After Classification        Operator commences filling out Independent Verification    ICMF and initials Step.
is obtained:
                                          *operator declares a General
* DECLARE the           Emergency, places time and GENERAL                date in the appropriate spots in the EMERGENCY (enter      ICMF, time and date on ICMF) and initials the step as the EC.
Examiners Note: NOTE the declaration time that the operator entered on the ICMF. The difference between the START TIME and the "DECLARED AT" TIME is the first critical time (15 min).
Time:
Page 9of16
 
JPM NUMBER:                ECG006                        NAME:    ~~~~~~~~~~~~~~~~-
REV NUMBER:                  10                        DATE:
I
(*Critical Step)                  COMMENTS STEP                                                                          SAT/
ELEMENT                      (#Sequential Step)                   (Required for NUMBER                                                                        UNSAT STANDARD                          UNSAT)@
* COMPLETE I            *operator places the EAL #(s):
APPROVE the ICMF       FB1.L, RB1.L(OR RB2.L) and CB1 .L, a description of the event, checks NO Release in progress, enters the wind direction and speed, determines PAR, and initials as EC in the appropriate spots in the ICMF, and initials the step as the EC.
Examiners Note: See the attached ICMF for an example of what the form should look like when filled out properly. Note that the exact words do not have to be in the "DESCRIPTION OF EVENT", but the description must convey the sense of the Initiating Condition for EALs FB1 .L, RB1 .L(OR RB2.L),
and CB1 .L. The operator may place the Examiner.'s name as the Communicator, or tell the Examiner to place his/her name as the Communicator.
: 5. If time allows OBTAIN      Operator requests ST A/IA perform accuracy peer check of the  an accuracy peer check of the completed ICMF              completed ICMF.
CUE: IF the Operator requests the STA/IA to perform an. accuracy peer check of the completed ICMF, THEN INFORM the Operator the STA/IA is not available.
: 6. Continue with NOTIFICATION AND ACTIVATION as follows:      Operator activates the ERO per posted instructions titled Training
* If not previously    Use Emergency Callout Activation performed, ACTIVATE  and initials Step.
I DIRECT ACTIVATION of ERO      Examiner Note: ENSURE the Emergency Callout    operator is using the Simulator (EP 96-003)            Training Activation instructions.
CUE:  If asked/requested to activate the ERO Emergency Callout, STATE "The ERO Callout is complete."
Page 10of16
 
JPM NUMBER:               ECG006                            NAME:      ~~~~~~~~~~~~~~~~-
REV NUMBER:                    10                            DATE:
(*Critical Step)                            COMMENTS STEP                                                                                  SAT/
ELEMENT                            (#Sequential Step)                           (Required for NUMBER                                                                                 UNSAT STANDARD                                    UNSAT)@
* DIRECT the Primary          *operator provides the ICMF to Communicator to            Primary Communicator and implement ECG              directs implementation of Att.6 Attachment 6 and initials Step.
Examiner Note: The difference between the "DECLARED AT" TIME and this LOG TIME is the second critical time (13 min.).
Time:
CUE:    Role-play as Primary Communicator and repeat back the directions given.
* DIRECT the Secondary        *operator directs CM2 to Communicator to            implement Att. 8 for a GENERAL implement ECG              EMERGENCY Attachment 8 for a GENERAL                    and initials Step.
EMERGENCY CUE:    Role-play as Secondary Communicator and repeat back the directions given. Provide Terminating Cue.
CUE:   WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.
REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
STOP TIME:
Task Standard: Operator declares a General Emergency in accordance with EALs FB1 .L, RB1 .L(OR RB2.L), and CB1 .L; initiates a PAR; and makes notifications within identified Critical Times in accordance with EP-HC-111-101.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]
Page 11of16
 
JOB PERFORMANCE MEASURE STATION: Hope Creek                                2016 NRC EXAM                    Copy _ _ of _ _
JPMA SYSTEM:   Control Rod and Drive Mechanism TASK NUMBER:    4000040401 TASK: Respond To An Uncoupled Control Rod JPM NUMBER: 305H-JPM.BF011                                                  REVISION: 04 SAP BET:  NOH05JPBF11 E KIA NUMBER:    201003 A2. Ability to (a) predict the impacts of the following on the CONTROL ROD AND DRIVE MECHANISM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:
(CFR: 41.5 I 45.6)
A2.02 Uncoupled rod IMPORTANCE FACTOR:             RO: 3.7    SRO: 3.8 ALTERNATE PATH:   C8J APPLICABILITY:                     RO   C8J                               SRO C8J EVALUATION SETTING/METHOD: Simulator/Perform


==REFERENCES:==
==REFERENCES:==
HC.OP-ST.BF-0001 Rev. 31 HC.OP-AB.IC-0001 Rev. 16 TOOLS, AND EQUIPMENT:      None ESTIMATED COMPLETION TIME:              33
                                                                                    ---    - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: - -N/A            ---
Minutes JPM PERFORMED BY:                                                    GRADE: SAT      D    UNSAT D ACTUAL COMPLETION TIME: - - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME: - -N/A            ---
Minutes REASON IF UNSATISFACTORY:
EVALUATOR:                                                                DATE:
Signature Page 1of14


HC.OP-ST.BF-0001 Rev. 31 HC.OP-AB.IC-0001 Rev. 16 TOOLS, AND EQUIPMENT:
JOB PERFORMANCE MEASURE SYSTEM:     Control Rod and Drive Mechanism TASK NUMBER:         4000040401 TASK:     Respond To An Uncoupled Control Rod INITIAL CONDllTONS:
None ESTIMATED COMPLETION TIME: 33 Minutes -----TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes -----JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: Minutes -----ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes -----REASON IF UNSATISFACTORY:
: 1. The Plant is operating at 100% power.
EVALUATOR:
: 2. Maintenance was performed on the position indication circuit of rod 38-03
DATE: Signature Page 1of14 JOB PERFORMANCE MEASURE SYSTEM: Control Rod and Drive Mechanism TASK NUMBER: 4000040401 TASK: Respond To An Uncoupled Control Rod INITIAL CONDllTONS: 1 . The Plant is operating at 100% power. 2. Maintenance was performed on the position indication circuit of rod 38-03 3. The maintenance is complete.  
: 3. The maintenance is complete.
: 4. As part of the retest requirements, performance of HC.OP-ST.BF-0001 Control Rod Drive Exercise -Weekly is required for control rod 38-03 only. 5. The "ON DUTY" Reactor Engineer has been notified that control rod 38-03 will be exercised IAW HC.OP-ST.BF-0001.  
: 4. As part of the retest requirements, performance of HC.OP-ST.BF-0001 Control Rod Drive Exercise - Weekly is required for control rod 38-03 only.
: 6. Use CRIDS for OD-7 control rod positions.  
: 5. The "ON DUTY" Reactor Engineer has been notified that control rod 38-03 will be exercised IAW HC.OP-ST.BF-0001.
: 7. The Reactor Engineer has approved exercising rod 38-03 at 100% power. 8. Stall flows are NOT required.  
: 6. Use CRIDS for OD-7 control rod positions.
: 9. HC.OP-ST.BF-0001, retest for control rod 38-03, has been entered in the Control Room log. INITIATING CUE: EXERCISE control rod 38-03 IAW HC.OP-ST.BF-0001.
: 7. The Reactor Engineer has approved exercising rod 38-03 at 100% power.
Page 2of14 JPM NUMBER: BF011 NAME:
: 8. Stall flows are NOT required.
REV NUMBER: 04 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ CUE: PROVIDE the operator the initiating cue, marked-up copy of HC.OP-ST.BF-0001, AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue. START TIME: Operator reviews precautions Operator reviews precautions and and limitations.
: 9. HC.OP-ST.BF-0001, retest for control rod 38-03, has been entered in the Control Room log.
limitations.
INITIATING CUE:
CUE: IF excessive time is taken reviewing precautions and limitations, THEN INFORM operator that all are satisfied.
EXERCISE control rod 38-03 IAW HC.OP-ST.BF-0001.
Operator determines beginning Operator determines correct step of the procedure.
Page 2of14
beginning step to be 5.1. 5.1 LOG test start time in the Operator requests the procedure Control Room log(s). be logged in the Control Room log and initials Step. CUE: The start time for HC.OP-ST.BF-0001 for retest of rod 38-03 only, has been logged in the Control Room log. ' 5.2 ENSURE all prerequisites of Operator ensures that all Section 2.0 are satisfied.
prerequisites have been satisfied and initials Step. CUE: If excessive time is taken reviewing prerequisites, inform operator that all are satisfied.


===5.3 ENSURE===
JPM NUMBER:              BF011                            NAME:      ~~~~~~~~~~~~~~~~~
Attachment 1, Operator observes Attachment 1 , Section 1.0 has been Section 1.0 has been completed completed AND Regular AND Retest is indicated and initials Surveillance OR Retest is Step. indicated.  
REV NUMBER:                04                              DATE:
(*Critical Step)                    COMMENTS STEP                                                                          SAT/
ELEMENT                        (#Sequential Step)                      (Required for NUMBER                                                                        UNSAT STANDARD                              UNSAT)@
CUE:  PROVIDE the operator the initiating cue, marked-up copy of HC.OP-ST.BF-0001, AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue.
START TIME:
Operator reviews precautions      Operator reviews precautions and and limitations.                  limitations.
CUE:  IF excessive time is taken reviewing precautions and limitations, THEN INFORM operator that all are satisfied.
Operator determines beginning    Operator determines correct step of the procedure.            beginning step to be 5.1.
5.1  LOG test start time in the        Operator requests the procedure Control Room log(s).              be logged in the Control Room log and initials Step.
CUE:  The start time for HC.OP-ST.BF-0001 for retest of rod 38-03 only, has been logged in the Control Room log.
5.2  ENSURE all prerequisites of      Operator ensures that all Section 2.0 are satisfied.        prerequisites have been satisfied and initials Step.
CUE:  If excessive time is taken reviewing prerequisites, inform operator that all are satisfied.
5.3 ENSURE Attachment 1,             Operator observes Attachment 1, Section 1.0 has been             Section 1.0 has been completed completed AND Regular             AND Retest is indicated and initials Surveillance OR Retest is         Step.
indicated.
5.4  OBTAIN a computer printout of    Operator displays OD-7 from the current Control Rod          GRIDS terminal and initials Step.
positions. (e.g. OD-7)
CUE:  Provide operator printout of OD-7 from CRIDS.
5.5  OBSERVE proper response of        Operator reviews the requirement the Nuclear Instrumentation      to observe proper response of the while withdrawing OR inserting    Nuclear Instrumentation while all Control Rods.                withdrawing OR inserting all Control Rods and initials Step.
5.6  SELECT the next Control Rod      *#Operator presses ROD AND RECORD or verify the          SELECT MODULE 38-03 initial Control Rod position on  pushbutton Attachment 2.
and initials Step.
Page 3of14


===5.4 OBTAIN===
JPM NUMBER:               BF011                           NAME:     ~~~~~~~~~~~~~~~~~
a computer printout of Operator displays OD-7 from the current Control Rod GRIDS terminal and initials Step. positions. (e.g. OD-7) CUE: Provide operator printout of OD-7 from CRIDS. 5.5 OBSERVE proper response of Operator reviews the requirement the Nuclear Instrumentation to observe proper response of the while withdrawing OR inserting Nuclear Instrumentation while all Control Rods. withdrawing OR inserting all Control Rods and initials Step. 5.6 SELECT the next Control Rod *#Operator presses ROD AND RECORD or verify the SELECT MODULE 38-03 initial Control Rod position on pushbutton Attachment
REV NUMBER:                 04                             DATE:
: 2. and initials Step. Page 3of14 JPM NUMBER: BF011 NAME:
(*Critical Step)             COMMENTS STEP                                                                          SAT/
REV NUMBER: 04 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ 5.7 lE Control Rod is at position 00, Operator determines that this step RECORD final Control Rod is N/A and marks Step N/A. position on Attachment  
ELEMENT                         (#Sequential Step)             (Required for NUMBER                                                                        UNSAT STANDARD                     UNSAT)@
: 2. All other blocks are N/A for this rod. 5.8 OBSERVE approximately 6 Operators observes approximately gpm total flow through both the 6 gpm total flow through both the insert AND withdraw Stabilizing insert AND withdraw Stabilizing Valves as indicated on CRID's Valves as indicated on CRID's point 82117. [70044199]
5.7 lE Control   Rod is at position 00, Operator determines that this step RECORD final Control Rod           is N/A and marks Step N/A.
point B2117 and initials Step. NOTE The following two steps will Operator reads NOTE and initials exercise the 1-BF-V138, Note. Cooling Water Header Check Valve, as required by TIS 4.0.5. If a "failed position" is encountered when a single notch insertion is attempted, an alternate position may be selected to insert the rod, provided that guidance is obtained from Reactor Engineering.
position on Attachment 2. All other blocks are N/A for this rod.
In this situation the remarks section of Attachment 3 should document the alternate position utilized.  
5.8 OBSERVE approximately 6             Operators observes approximately gpm total flow through both the     6 gpm total flow through both the insert AND withdraw Stabilizing   insert AND withdraw Stabilizing Valves as indicated on CRID's       Valves as indicated on CRID's point 82117. [70044199]           point B2117 and initials Step.
NOTE   The following two steps will       Operator reads NOTE and initials exercise the 1-BF-V138,             Note.
Cooling Water Header Check Valve, as required by TIS 4.0.5.
If a "failed position" is encountered when a single notch insertion is attempted, an alternate position may be selected to insert the rod, provided that guidance is obtained from Reactor Engineering. In this situation the remarks section of Attachment 3 should document the alternate position utilized.
5.9  INSERT the selected Control        *#operator momentarily Rod one notch (or as directed      presses the ROD MOTION by Reactor Engineering) AND        CONTROLS INSERT pushbutton PERFORM the following: [T/S 4.1.3.1.2, TIS 4.1.3.7]            and initials Step.
5.9.1 ENSURE proper operation of          Operator observes the CONTROL the RPIS.                          ROD POSITION FOUR ROD DISPLAY, RWM, or GRIDS indicates control rod movement to position 46 and initials Step.
5.9.2 lE a Control  rod is inadvertently  Operator determines that this step positioned at other than the        is N/A and marks Step N/A.
desired position, THEN IMPLEMENT the associated guidance contained in the Reactor Engineering Weekly Guidance AND CONTACT Reactor Engineering.
Page 4of14


===5.9 INSERT===
JPM NUMBER:   ~~~~~~~~~-
the selected Control *#operator momentarily Rod one notch (or as directed presses the ROD MOTION by Reactor Engineering)
BF011                         NAME:
AND CONTROLS INSERT pushbutton PERFORM the following:
REV NUMBER:                 04                           DATE:
[T/S 4.1.3.1.2, TIS 4.1.3.7] and initials Step. 5.9.1 ENSURE proper operation of Operator observes the CONTROL the RPIS. ROD POSITION FOUR ROD DISPLAY, RWM, or GRIDS indicates control rod movement to position 46 and initials Step. 5.9.2 lE a Control rod is inadvertently Operator determines that this step positioned at other than the is N/A and marks Step N/A. desired position, THEN IMPLEMENT the associated guidance contained in the Reactor Engineering Weekly Guidance AND CONTACT Reactor Engineering.
(*Critical Step)             COMMENTS STEP                                                                          SAT/
Page 4of14 JPM NUMBER: BF011 NAME:
ELEMENT                       (#Sequential Step)               (Required for NUMBER                                                                        UNSAT STANDARD                     UNSAT)(@
REV NUMBER: 04 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)(@ 5.9.3 lE the control rod does not Operator determines that this step insert to the next notch after is N/A and marks Step N/A. one attempt, PERFORM the following:  
5.9.3 lE the control rod does not     Operator determines that this step insert to the next notch after   is N/A and marks Step N/A.
... 5.9.4 INDICATE the condition of Operator then indicates the RPIS RPIS indication on Attachment indication is SAT on Attachment 2 2. and initials Step. 5.10 IF the position recorded in Step Operator determines the position 5.6 is an intermediate position, recorded in Step 5. 7 is NOT an THEN PERFORM Step 5.10.1, intermediate position, continues at OTHERWISE, GO TO Step step 5.10.2 and initials Step. 5.10.2 to return the control rod to its original position:  
one attempt, PERFORM the following: ...
... NOTE IF drive water pressure was Operator reads NOTE and increased to withdraw a control determines the NOTE is not rod from position 46, the same applicable and initials NOTE. or slightly higher pressure should be used to perform the ' uncoupling check. [80009340]
5.9.4 INDICATE the condition of       Operator then indicates the RPIS RPIS indication on Attachment     indication is SAT on Attachment 2
: 2.                               and initials Step.
5.10 IF the position recorded in Step Operator determines the position 5.6 is an intermediate position, recorded in Step 5. 7 is NOT an THEN PERFORM Step 5.10.1,         intermediate position, continues at OTHERWISE, GO TO Step             step 5.10.2 and initials Step.
5.10.2 to return the control rod to its original position: ...
NOTE   IF drive water pressure was       Operator reads NOTE and increased to withdraw a control   determines the NOTE is not rod from position 46, the same   applicable and initials NOTE.
or slightly higher pressure should be used to perform the                                   '
uncoupling check. [80009340]
Control Rods experiencing coupling problems should be single-notched to 48 (with settle) prior to using continuous withdraw to verify coupling.
Control Rods experiencing coupling problems should be single-notched to 48 (with settle) prior to using continuous withdraw to verify coupling.
5.10.2 WITHDRAW the control rod to *#Operator simultaneously . , position 48 AND PERFORM presses AND holds both the the following while giving the WITHDRAW pushbutton AND the selected Control Rod a CONTINUOUS WITHDRAW continuous withdraw signal: pushbutton  
5.10.2 WITHDRAW the control rod to       *#Operator simultaneously . ,
[T/S 4.1.3.6, T/S 4.1.3.7] and initials Step. A. OBSERVE the following as indication of the Control Rod being coupled: 1. ROD OVERTRAVEL alarm Operator observes OHA C6-F3 does NOT annunciate.
position 48 AND PERFORM           presses AND holds both the the following while giving the   WITHDRAW pushbutton AND the selected Control Rod a           CONTINUOUS WITHDRAW continuous withdraw signal:       pushbutton
ROD OVERTRAVEL DOES annunciate.
[T/S 4.1.3.6, T/S 4.1.3.7]
CRIDS C071, ROD OVERTRAVEL, in alarm. Operator releases both the WITHDRAW pushbutton AND the CONTINUOUS WITHDRAW pushbutton.  
and initials Step.
: 2. Red Full Out light Operator observes the red FULL illuminates on the Full Core OUT light on the Full Core Display Display. EXTINGUISHES.
A. OBSERVE the following as indication of the Control Rod being coupled:
Page 5of14 JPM NUMBER: BF011 NAME: REV NUMBER: 04 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ 3. RPIS indicates the Control Operator observes RPIS does Rod is full out (48). indicate position 48 on OD-7. However, indicates 49, in alarm, on CRIDS page 249. 4. Proper response of the Operator recognizes the expected Nuclear Instrumentation response of the Nuclear while withdrawing the Instrumentation while withdrawing Control Rod. the Control Rod. Examiner Note: The expected response for a rod from 46 to 48 is negligible.
: 1. ROD OVERTRAVEL alarm         Operator observes OHA C6-F3 does NOT annunciate.         ROD OVERTRAVEL DOES annunciate. CRIDS C071, ROD OVERTRAVEL, in alarm.
B. INDICATE on Attachment 2 the Operator indicates the coupling condition of Coupling Check. check is UNSAT on Attachment  
Operator releases both the WITHDRAW pushbutton AND the CONTINUOUS WITHDRAW pushbutton.
: 2. NOTE Stall flows need to be taken at Operator reads NOTE and initials least each month. Stall flows NOTE. should be recorded the first ' time this test is performed each month OR as requested by System Engineer.
: 2. Red Full Out light           Operator observes the red FULL illuminates on the Full Core OUT light on the Full Core Display Display.                     EXTINGUISHES.
C. PERFORM the following for Based on the Initial Conditions, stall flow: ... Operator determines Stall Flow is NOT required.
Page 5of14
Operator marks the step N/A. D. lE the CRD over travels, THEN Operator informs the CRS of IMPLEMENT HC.OP-AB.IC-uncoupled control rod and entry 0001(0), Control Rod. condition into HC.OP-AB.IC-0001 and initials Step. CUE: Acknowledge the report, and DIRECT the Operator to implement Condition D of HC.OP-AB.IC-0001. HC.OP-AB.IC-0001 CONDITION D, Uncoupled Rod AND Movement Permitted by the RWM NOTE 1 1. Tech Spec 3.1.3.6 has a 2 Operator reads NOTE 1. hour time limit associated with it. D.1 OBTAIN Reactor Engineering Operator requests Reactor guidance to recouple the Engineering guidance to recouple Control Rod. the Control Rod and initials Step. CUE: INFORM the Operator that Reactor Engineer's guidance in NOT available.
 
Page 6of14 JPM NUMBER: BF011 NAME:
JPM NUMBER:                 BF011                         NAME:
REV NUMBER: 04 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ D.2 lE Reactor Engineering Operator determines step D.2 is guidance CANNOT be applicable and initials Step. obtained, THEN RECOUPLE the Control Rod as follows: a. INSERT the CRD no more Operator single notch inserts rod than 2 notches from the 38-03 to position 46 (no more than point of discovery.
REV NUMBER:                   04                           DATE:
position 44) using INSERT PB and initials Step. Examiner Note: Due to the rod being at Overtravel, it will take two single notch insertions to insert the rod to 46. The first insertion will settle the rod at 48 and may bring in OHA C6 E3 ROD DRIFT. IF ROD DRIFT alarm comes in, THEN operator will respond using OHA C6-E3 Alarm Response Procedure and determine rod 38-03 caused the alarm. b. Single Notch WITHDRAW single notch the Control Rod to its withdraws rod 38-03 to position original position AND 48. VERIFY expected response.
(*Critical Step)               COMMENTS STEP                                                                          SAT/
Operator observes correct response of the control rod and initials Step. c. PERFORM a coupling Operator requests copy of HG.OP-check on the associated ST.BF-0001.
ELEMENT                     (#Sequential Step)                 (Required for NUMBER                                                                        UNSAT STANDARD                       UNSAT)@
control rod IAW ST.BF-0001. CUE: Provide operator 2nd marked up copy of HC.OP-ST.BF-0001 IF requested.
: 3. RPIS indicates the Control Operator observes RPIS does Rod is full out (48).       indicate position 48 on OD-7.
HC.OP-ST .BF-0001 5.10.2 WITHDRAW the control rod to *#Operator simultaneously position 48 AND PERFORM presses AND holds both the the following while giving the WITHDRAW pushbutton AND the selected Control Rod a CONTINUOUS WITHDRAW continuous withdraw signal: pushbutton.  
However, indicates 49, in alarm, on CRIDS page 249.
[T/S 4.1.3.6, T/S 4.1.3.7) A. OBSERVE the following as indication of the Control Rod Operator observes OHA C6 F3 being coupled: ROD OVERTRAVEL does NOT 1. ROD OVERT RAVEL alarm annunciate and initials Step. does NOT annunciate.
: 4. Proper response of the     Operator recognizes the expected Nuclear Instrumentation     response of the Nuclear while withdrawing the       Instrumentation while withdrawing Control Rod.               the Control Rod.
Page 7of14 JPM NUMBER: BF011 NAME:
Examiner Note: The expected response for a rod from 46 to 48 is negligible.
REV NUMBER: 04 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ 2. Red Full Out light Operator observes the red FULL illuminates on the Full Core OUT light on the Full Core Display Display. illuminates and initials Step. 3. RPIS indicates the Control Operator observes RPIS indicates Rod is full out (48). the Control Rod is full out (48) and initials Step. 4. Proper response of the Operator recognizes the expected Nuclear Instrumentation response of the Nuclear while withdrawing the Instrumentation while withdrawing Control Rod. the Control Rod and initials Step. Examiner Note: The expected response for a rod at 48 is negligible.
B. INDICATE on Attachment 2 the     Operator indicates the coupling condition of Coupling Check. check is UNSAT on Attachment 2.
B. INDICATE on Attachment 2 the Operator indicates the coupling condition of Coupling Check. check is SAT on Attachment 2 and initials Step. Examiner Note: Operator may ' initial D.2.c or HC.OP-AB.IC-0001 at this time. HC.OP-AB.IC-0001 CONDITION D, Uncoupled Rod AND Movement Permitted by the RWM D.3 RESTRICT all further Operator informs the CRS that all withdrawals of this rod to further withdrawals of this rod Single Notch movement until should be restricted to Single repairs have been completed.
NOTE   Stall flows need to be taken at Operator reads NOTE and initials least each month. Stall flows   NOTE.
Notch movement until repairs have been completed.
should be recorded the first
CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME. REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
      ' time this test is performed each month OR as requested by System Engineer.
STOP TIME: Task Standard:
C. PERFORM the following for       Based on the Initial Conditions, stall flow: ...                 Operator determines Stall Flow is NOT required. Operator marks the step N/A.
Operator exercises, and re-couples, control rod 38-03 IAW HC.OP-ST.BF-0001.  
D. lE the CRD over travels, THEN   Operator informs the CRS of IMPLEMENT HC.OP-AB.IC-           uncoupled control rod and entry 0001(0), Control Rod.           condition into HC.OP-AB.IC-0001 and initials Step.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments.  
CUE:   Acknowledge the report, and DIRECT the Operator to implement Condition D of HC.OP-AB.IC-0001.
[IER L 1-11-3 Rec. 3b] Page 8of14 JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Feedwater TASK NUMBER: 2590120101 TASK: Place The First RFPT In Service JPM NUMBER: 305H-JPM.AE005 SAP BET: NOH05JPAE05E 2016 NRC EXAM JPM B Copy __ of __ REVISION:
HC.OP-AB.IC-0001 CONDITION D, Uncoupled Rod AND Movement Permitted by the RWM NOTE 1   1. Tech Spec 3.1.3.6 has a 2   Operator reads NOTE 1.
10 KIA NUMBER: 259001 A4. Ability to manually operate and/or monitor in the control room: (CFR: 41.7 / 45.5 TO 45.8) A4.02 Manually start/control a RFP/TDRFP IMPORTANCE FACTOR: RO: 3.9 SRO: 3.7 ALTERNATE PATH: D APPLICABILITY: EVALUATION SETTING/METHOD:
hour time limit associated with it.
Simulator/Perform  
D.1   OBTAIN Reactor Engineering       Operator requests Reactor guidance to recouple the         Engineering guidance to recouple Control Rod.                     the Control Rod and initials Step.
CUE:   INFORM the Operator that Reactor Engineer's guidance in NOT available.
Page 6of14
 
JPM NUMBER:                 BF011                       NAME:     ~~~~~~~~~~~~~~~~-
REV NUMBER:                   04                         DATE:
(*Critical Step)               COMMENTS STEP                                                                          SAT/
ELEMENT                     (#Sequential Step)               (Required for NUMBER                                                                          UNSAT STANDARD                       UNSAT)@
D.2     lE Reactor Engineering         Operator determines step D.2 is guidance CANNOT be             applicable and initials Step.
obtained, THEN RECOUPLE the Control Rod as follows:
: a. INSERT the CRD no more   Operator single notch inserts rod than 2 notches from the   38-03 to position 46 (no more than point of discovery.       position 44) using INSERT PB and initials Step.
Examiner Note: Due to the rod being at Overtravel, it will take two single notch insertions to insert the rod to 46. The first insertion will settle the rod at 48 and may bring in OHA C6 E3 ROD DRIFT. IF ROD DRIFT alarm comes in, THEN operator will respond using OHA C6-E3 Alarm Response Procedure and determine rod 38-03 caused the alarm.
: b. Single Notch WITHDRAW     *#operat~r single notch the Control Rod to its   withdraws rod 38-03 to position original position AND     48.
VERIFY expected response.                 Operator observes correct response of the control rod and initials Step.
: c. PERFORM a coupling       Operator requests copy of HG.OP-check on the associated   ST.BF-0001.
control rod IAW ST.BF-0001.
CUE:     Provide operator 2nd marked up copy of HC.OP-ST.BF-0001 IF requested.
HC.OP-ST .BF-0001 5.10.2   WITHDRAW the control rod to   *#Operator simultaneously position 48 AND PERFORM       presses AND holds both the the following while giving the WITHDRAW pushbutton AND the selected Control Rod a         CONTINUOUS WITHDRAW continuous withdraw signal:   pushbutton.
[T/S 4.1.3.6, T/S 4.1.3.7)
A.     OBSERVE the following as indication of the Control Rod being coupled:                Operator observes OHA C6 F3 ROD OVERTRAVEL does NOT
: 1. ROD OVERT RAVEL alarm     annunciate and initials Step.
does NOT annunciate.
Page 7of14
 
JPM NUMBER:                 BF011                           NAME:     ~~~~~~~~~~~~~~~~~
REV NUMBER:                   04                             DATE:
(*Critical Step)                     COMMENTS STEP                                                                            SAT/
ELEMENT                         (#Sequential Step)                     (Required for NUMBER                                                                          UNSAT STANDARD                             UNSAT)@
: 2. Red Full Out light           Operator observes the red FULL illuminates on the Full Core OUT light on the Full Core Display Display.                     illuminates and initials Step.
: 3. RPIS indicates the Control   Operator observes RPIS indicates Rod is full out (48).       the Control Rod is full out (48) and initials Step.
: 4. Proper response of the       Operator recognizes the expected Nuclear Instrumentation       response of the Nuclear while withdrawing the         Instrumentation while withdrawing Control Rod.                 the Control Rod and initials Step.
Examiner Note: The expected response for a rod at 48 is negligible.
B.     INDICATE on Attachment 2 the     Operator indicates the coupling condition of Coupling Check. check is SAT on Attachment 2 and initials Step.
Examiner Note: Operator may                               '
initial D.2.c or HC.OP-AB.IC-0001 at this time.
HC.OP-AB.IC-0001 CONDITION D, Uncoupled Rod AND Movement Permitted by the RWM D.3     RESTRICT all further             Operator informs the CRS that all withdrawals of this rod to       further withdrawals of this rod Single Notch movement until       should be restricted to Single repairs have been completed.     Notch movement until repairs have been completed.
CUE:   WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.
REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
STOP TIME:
Task Standard: Operator exercises, and re-couples, control rod 38-03 IAW HC.OP-ST.BF-0001.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L1-11-3 Rec. 3b]
Page 8of14
 
JOB PERFORMANCE MEASURE STATION: Hope Creek                           2016 NRC EXAM                          Copy _ _ of _ _
JPM B SYSTEM:   Feedwater TASK NUMBER:     2590120101 TASK: Place The First RFPT In Service JPM NUMBER: 305H-JPM.AE005                                                 REVISION: 10 SAP BET:   NOH05JPAE05E KIA NUMBER:   259001 A4. Ability to manually operate and/or monitor in the control room:
(CFR: 41.7 / 45.5 TO 45.8)
A4.02 Manually start/control a RFP/TDRFP IMPORTANCE FACTOR:             RO: 3.9     SRO: 3.7 ALTERNATE PATH:   D APPLICABILITY:                     RO~                                SRO~
EVALUATION SETTING/METHOD: Simulator/Perform


==REFERENCES:==
==REFERENCES:==
HC.OP-SO.AE-0001 Rev. 72 TOOLS, AND EQUIPMENT:      None ESTIMATED COMPLETION TIME: - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: - -              N/A
                                                                                          - - Minutes JPM PERFORMED BY:                                                  GRADE: SAT      D      UNSAT D ACTUAL COMPLETION TIME:
                                                                                  - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME: - -              N/A
                                                                                          - - Minutes REASON IF UNSATISFACTORY:
EVALUATOR:                                                              DATE:
Signature Page 1of10


HC.OP-SO.AE-0001 Rev. 72 TOOLS, AND EQUIPMENT:
JOB PERFORMANCE MEASURE SYSTEM:     Feedwater TASK NUMBER:       2590120101 TASK:   Place The First RFPT In Service INITIAL CONDllTONS:
None ESTIMATED COMPLETION TIME: 11 Minutes ----TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes ----JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: Minutes ----ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes ----REASON IF UNSATISFACTORY:
: 1. A plant startup from cold shutdown is in progress IAW HC.OP-IO.ZZ-0003.
EVALUATOR:
: 2. Reactor Pressure is approximately 500 psig.
DATE: Signature Page 1of10 JOB PERFORMANCE MEASURE SYSTEM: Feedwater TASK NUMBER: 2590120101 TASK: Place The First RFPT In Service INITIAL CONDllTONS:  
: 3. AP101 and BP101 RFPs are on Recirc IAW Section 5.3 of HC.OP-SO.AE-0001.
: 1. A plant startup from cold shutdown is in progress IAW HC.OP-IO.ZZ-0003.  
: 4. Startup level control is in AUTO Reactor Vessel level control.
: 2. Reactor Pressure is approximately 500 psig. 3. AP101 and BP101 RFPs are on Recirc IAW Section 5.3 of HC.OP-SO.AE-0001.  
: 5. Chemistry is ready to place Condensate Polisher Vessels in service as required.
: 4. Startup level control is in AUTO Reactor Vessel level control. 5. Chemistry is ready to place Condensate Polisher Vessels in service as required.
INITIATING CUE:
INITIATING CUE: PLACE Reactor Feed Pump AP101 in service in Manual control in accordance with 5.4 of HC.OP-SO.AE-0001. Page 2of10 JPM NUMBER: AE005 NAME:
PLACE Reactor Feed Pump AP101 in service in Manual control in accordance with 5.4 of HC.OP-SO.AE-0001.
REV NUMBER: 10 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT) CUE: PROVIDE the operator the initiating cue AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue. START TIME: Operator obtains and locates Operator obtains the correct procedure HC.OP-SO.AE-procedure.
Page 2of10
0001. Operator reviews precautions Operator reviews precautions and and limitations.
limitations.
CUE: IF excessive time is taken reviewing precautions and limitations, THEN INFORM operator that all are satisfied.
Operator determines beginning Operator determines correct step of the procedure.
beginning step to be 5.4. 5.4.1 ENSURE all prerequisites of Operator ensures that all ' Section 2.4 are satisfied.
prerequisites have been satisfied, and initials Step. ' CAUTION Opening the HV-1769A{B,C)
Operator reads and initials REACTOR FEED PUMP CAUTION. A(B,C) DISCH STOP CHK VLV MOT OPER completes the RFP start logic. IF adequate SCP(s) are NOT in service, a RFP trip will occur. (REFER to Attachment 1.) 5.4.2 ENSURE HV-1769A(B,C), *#Operator opens HV-1769A, REACTOR FEED PUMP A(B,C) DISCH STOP CHK VLV and initials Step. MOT OPER, is open. NOTE Placing the initial Reactor Feed Operator reads and initials NOTE. Pump in service will cause a transient on the pump rotating assembly.
Vibration and/or axial displacement alarms are possible immediately after placing the pump in service, and are expected to clear after the pump is in service and the discharge pressure is stable. Page 3of10 JPM NUMBER: AE005 REV NUMBER: 10
(*Critical Step) SAT/ COMMENTS STEP ELEMENT (#Sequential Step) (Required for NUMBER STANDARD UNSAT UNSAT) CAUTION Reactor Feed Pump Turbine Operator reads and initials Critical Speed is approximately CAUTION. 3400 rpm. Operation in the range of 3250 rpm to 3550 rpm should be minimized.


====5.4.3 PRESS====
JPM NUMBER:  ~~~~~~~~~~
RFPT A(B,C) SPEED *#operator presses RFPT A CTRLR SPD DEMAND INC i SPEED CTRLR SPD DEMAND pushbutton as required to INC i pushbutton as required to establish approximately 150 to establish approximately 150 to 450 psid across the Startup 450 psid across the Startup Valves to achieve positive Valve, response on the startup valves. and initials Step. 5.4.4 CLOSE HV-1772A(B,C), RFPT *operator closes HV-1772A, A(B,C) STEAM LOW PRESSURE SUPPLY STOP and initials Step. VLV BELOW SEAT DRAIN MOV. 5.4.5 CLOSE HV-1786, RFP *#Operator closes HV-1786, BYPASS STOP VLV. and initials Step. NOTE For RFP Turbine speed ;::: 5000 Operator reads and initials NOTE. rpm increase the RFPT RECIRC FLOW CTRL A{B,C) setpoint to 4500 gpm. If possible, maintain RFP DISCH Press such that level control is accomplished via LV-1785. Valve differential pressure of < 450 psid should be attempted to be maintained.
AE005                          NAME:
CAUTION Carefully monitor for vessel Operator reads and initials level swings AND RFPT CAUTION. hunting when controlling differential pressure across the S/U valves in AUTO AND below 900 psig RX Pressure.
REV NUMBER:                  10                            DATE:
Page 4of10 JPM NUMBER: AE005 NAME:
(*Critical Step)                  COMMENTS STEP                                                                        SAT/
REV NUMBER: 10 DATE: STEP NUMBER 5.4.6 ELEMENT CONTROL the differential pressure across the startup valves automatically or manually by performing the following:
ELEMENT                        (#Sequential Step)                  (Required for NUMBER                                                                        UNSAT STANDARD                          UNSAT)
A. MANUAL 1. Intermittently PRESS RFPT A(B,C) SPEED CONTROLLER SPD DEMAND INC I OR DEC ! pushbutton as necessary to maintain RFP discharge press above Reactor pressure to allow Startup Valve to Control Reactor Vessel level. (*Critical Step) (#Sequential Step) STANDARD Examiner Note: Operator may adjust A RFP speed again to ensure dp in the range of 150 to 450 psid. Operator reads and initials Step. SAT/ UNSAT COMMENTS (Required for UNSAT) CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME. REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
CUE:  PROVIDE the operator the initiating cue AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue.
STOP TIME: -------Task Standard:
START TIME:
Operator places AP101 Reactor Feed Pump in service in Manual control in accordance with HC.OP-SO.AE-0001.
Operator obtains and locates      Operator obtains the correct procedure HC.OP-SO.AE-            procedure.
Page 5of10 JOB PERFORMANCE MEASURE STATION: Hope Creek 2016 NRC EXAM JPMC Copy __ of __ SYSTEM: Integrated Operating Procedures TASK NUMBER: 30002090101 TASK: Perform a Cooldown Using Bypass Valves JPM NUMBER: 305H-JPM.AC008 SAP BET: NOH05JPAC08E REVISION:
0001.
01 K/A NUMBER: 241000 A4. Ability to manually operate and/or monitor in the control room: (CFR: 41. 7 I 45.5 TO 45.8) A4.02 Reactor pressure IMPORTANCE FACTOR: RO: 4.1 ALTERNATE PATH: D APPLICABILITY: EVALUATION SETTING/METHOD:
Operator reviews precautions      Operator reviews precautions and and limitations.                  limitations.
Simulator/Perform  
CUE:  IF excessive time is taken reviewing precautions and limitations, THEN INFORM operator that all are satisfied.
Operator determines beginning    Operator determines correct step of the procedure.            beginning step to be 5.4.
5.4.1  ENSURE all prerequisites of      Operator ensures that all Section 2.4 are satisfied.        prerequisites have been satisfied, and initials Step.                      '
CAUTION Opening the HV-1769A{B,C)        Operator reads and initials REACTOR FEED PUMP                CAUTION.
A(B,C) DISCH STOP CHK VLV MOT OPER completes the RFP start logic. IF adequate SCP(s) are NOT in service, a RFP trip will occur. (REFER to Attachment 1.)
5.4.2  ENSURE HV-1769A(B,C),            *#Operator opens HV-1769A, REACTOR FEED PUMP A(B,C) DISCH STOP CHK VLV        and initials Step.
MOT OPER, is open.
NOTE  Placing the initial Reactor Feed  Operator reads and initials NOTE.
Pump in service will cause a transient on the pump rotating assembly. Vibration and/or axial displacement alarms are possible immediately after placing the pump in service, and are expected to clear after the pump is in service and the discharge pressure is stable.
Page 3of10
 
JPM NUMBER:    ~~~~~~~~~-
AE005 REV NUMBER:    ~~~~~~~~~-
10
(*Critical Step)            COMMENTS STEP                                                                      SAT/
ELEMENT                      (#Sequential Step)            (Required for NUMBER                                                                      UNSAT STANDARD                    UNSAT)
CAUTION Reactor Feed Pump Turbine        Operator reads and initials Critical Speed is approximately  CAUTION.
3400 rpm.
Operation in the range of 3250 rpm to 3550 rpm should be minimized.
5.4.3 PRESS RFPT A(B,C) SPEED         *#operator presses RFPT A CTRLR SPD DEMAND INC i           SPEED CTRLR SPD DEMAND pushbutton as required to       INC i pushbutton as required to establish approximately 150 to   establish approximately 150 to 450 psid across the Startup     450 psid across the Startup Valves to achieve positive       Valve, response on the startup valves.
and initials Step.
5.4.4 CLOSE HV-1772A(B,C), RFPT       *operator closes HV-1772A, A(B,C) STEAM LOW PRESSURE SUPPLY STOP             and initials Step.
VLV BELOW SEAT DRAIN MOV.
5.4.5 CLOSE HV-1786, RFP               *#Operator closes HV-1786, BYPASS STOP VLV.
and initials Step.
NOTE   For RFP Turbine speed ;::: 5000 Operator reads and initials NOTE.
rpm increase the RFPT RECIRC FLOW CTRL A{B,C) setpoint to 4500 gpm.
If possible, maintain RFP DISCH Press such that level control is accomplished via LV-1785. Valve differential pressure of < 450 psid should be attempted to be maintained.
CAUTION Carefully monitor for vessel     Operator reads and initials level swings AND RFPT           CAUTION.
hunting when controlling differential pressure across the S/U valves in AUTO AND below 900 psig RX Pressure.
Page 4of10
 
JPM NUMBER:               AE005                       NAME:
                ~---------                                      ~----------------
REV NUMBER:                 10                         DATE:
(*Critical Step)                        COMMENTS STEP                                                                         SAT/
ELEMENT                    (#Sequential Step)                        (Required for NUMBER                                                                       UNSAT STANDARD                                UNSAT)
Examiner Note: Operator may 5.4.6   CONTROL the differential adjust A RFP speed again to pressure across the startup ensure dp in the range of 150 to valves automatically or 450 psid.
manually by performing the following:                     Operator reads and initials Step.
A. MANUAL
: 1. Intermittently PRESS RFPT A(B,C) SPEED CONTROLLER SPD DEMAND INC I OR DEC ! pushbutton as necessary to maintain RFP discharge press above Reactor pressure to allow Startup Valve to Control Reactor Vessel level.
CUE:   WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.
REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
STOP TIME: - - - - - - -
Task Standard: Operator places AP101 Reactor Feed Pump in service in Manual control in accordance with HC.OP-SO.AE-0001.
Page 5of10
 
JOB PERFORMANCE MEASURE STATION: Hope Creek                                 2016 NRC EXAM                   Copy _ _ of _ _
JPMC SYSTEM:   Integrated Operating Procedures TASK NUMBER:     30002090101 TASK: Perform a Cooldown Using Bypass Valves JPM NUMBER: 305H-JPM.AC008                                                 REVISION: 01 SAP BET:   NOH05JPAC08E K/A NUMBER:   241000 A4. Ability to manually operate and/or monitor in the control room:
(CFR: 41. 7 I 45.5 TO 45.8)
A4.02 Reactor pressure IMPORTANCE FACTOR:             RO: 4.1    SRO: 4.1 ALTERNATE PATH:   D APPLICABILITY:                     RO~                                SRO~
EVALUATION SETTING/METHOD: Simulator/Perform


==REFERENCES:==
==REFERENCES:==
HC.OP-IO.ZZ-0004, Rev. 100 TOOLS, AND EQUIPMENT:      None ESTIMATED COMPLETION TIME:                16 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: - -N/A            ---
Minutes JPM PERFORMED BY:                                                  GRADE: SAT      D      UNSAT D ACTUAL COMPLETION TIME: - - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME: _ _N_;_/A          _ _ Minutes REASON IF UNSATISFACTORY:
EVALUATOR:                                                            DATE:
Signature Page 1of10


HC.OP-IO.ZZ-0004, Rev. 100 TOOLS, AND EQUIPMENT:
JOB PERFORMANCE MEASURE SYSTEM:     Integrated Operating Procedures TASK NUMBER:       30002090101 TASK:   Perform a Cool down Using Bypass Valves INITIAL CONDllTONS:
None SRO: 4.1 ESTIMATED COMPLETION TIME: 16 Minutes ----'---TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes -----JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: Minutes -----ACTUAL TIME CRITICAL COMPLETION TIME: __ N_;_/A __ Minutes REASON IF UNSATISFACTORY:
: 1. A plant shut down is in progress for a refueling outage.
EVALUATOR:
: 2. HC.OP-IO.ZZ-0004 has been implemented through Step 5.1.48.
DATE: Signature Page 1of10 JOB PERFORMANCE MEASURE SYSTEM: Integrated Operating Procedures TASK NUMBER: 30002090101 TASK: Perform a Cool down Using Bypass Valves INITIAL CONDllTONS:  
INITIATING CUE:
: 1. A plant shut down is in progress for a refueling outage. 2. HC.OP-IO.ZZ-0004 has been implemented through Step 5.1.48. INITIATING CUE: COMMENCE a Reactor Cooldown and Depressurization to 530 psig in accordance with Step 5.2.1.B of HC.OP-IO.ZZ-0004:
COMMENCE a Reactor Cooldown and Depressurization to 530 psig in accordance with Step 5.2.1.B of HC.OP-IO.ZZ-0004: Another operator will plot cooldown rate.
Another operator will plot cooldown rate. Page 2of10 JPM NUMBER: AC008 NAME:
Page 2of10
REV NUMBER: 01 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ CUE: PROVIDE the operator the initiating cue AND ENTER START TIME AFTER Operator repeats back the Initiating Cue. START TIME: Operator obtains procedure Operator obtains the correct HC.OP-IO.ZZ-0004.
 
JPM NUMBER:             AC008                           NAME:     ~~~~~~~~~~~~~~~~~
REV NUMBER:               01                             DATE:
(*Critical Step)                   COMMENTS STEP                                                                          SAT/
ELEMENT                       (#Sequential Step)                     (Required for NUMBER                                                                        UNSAT STANDARD                           UNSAT)@
CUE: PROVIDE the operator the initiating cue AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.
START TIME:
Operator obtains procedure       Operator obtains the correct HC.OP-IO.ZZ-0004.                 procedure.
Operator reviews precautions      Operator reviews precautions and and limitations.                  limitations, and initials each one.
CUE:  If excessive time is taken reviewing precautions and limitations, inform operator that all are satisfied.
2.0  PREREQUISITES ENSURE all personnel who are      Operator completes Attachment 1, to perform any step(s) in this    Section 1.0, prior to performing any procedure have completed          part of this procedure, and initials Attachment 1, Section 1.0, prior  Step.
to performing any part of this                                    '
procedure.
procedure.
Operator reviews precautions Operator reviews precautions and and limitations.
Operator determines beginning    Operator determines correct step of the procedure.            beginning step to be 5.2.1.B.
limitations, and initials each one. CUE: If excessive time is taken reviewing precautions and limitations, inform operator that all are satisfied.  
NOTE  Steam Loads, Decay Heat, and     Operator reads and initials NOTE.
Feed will directly affect Cooldown I Depressurization.
Impact of these variables,                                        ,,
regardless of DEHC Control mode selected, MUST be continuously evaluated for impact on the cooldown.
The cooldown rate should be limited to 60&deg;F per hour when above 200 psig to preclude RWCU flashing.
At approximately 200 psig reactor pressure, the cooldown rate should be limited to approximately 30&deg; F/hr to prevent excessive cavitation of the RWCU pump.
Page 3of10
 
JPM NUMBER:                  AC008                            NAME:
REV NUMBER:                    01                            DATE:
(*Critical Step)            COMMENTS STEP                                                                          SAT/
ELEMENT                        (#Sequential Step)            (Required for NUMBER                                                                          UNSAT STANDARD                  UNSAT)(a) 5.2.1. CONTINUE/MAINTAIN a cooldown rate of::; 60&deg;F/hr using Rx Cooldown mode, Pressure Control mode OR Bypass Valve Manual Jack as follows:
A. Establish PRESSURE          Operator determines and marks CONTROL as ...              this Step as N/A.
NOTE    When Rx Cooldown mode is          Operator reads and initials NOTE.
initiated with a bypass valve open, a minor Pressure Rise will occur. This pressure rise should be anticipated when placing Rx Cooldown controller in service.
Any cooldown that has occurred since the shutdown must be considered prior to
        ' establishing Rx Cooldown mode in determining initial cooldown so as NOT to exceed 60&deg;F/hr.
Once Rx Cooldown mode is established, the INTENT is to remain on the Rx Cooldown controller for the duration of the Cooldown I Depressurization.
An In-Progress Cooldown can be interrupted to support plant manipulations without exiting the Rx Cooldown mode by establishing the temperature Setpoint at the desired hold point on the Cooldown Controller.
5.2.1.B. B. IF desired, Establish        *#operator selects !control! ,
REACTOR COOLDOWN and IRX Cooldown I.
as follows:
and initials Step.
: 1. SELECT IControll ,
IRX Cooldownl
: 2. SELECT jRamp Rat~        *#operator selects !Ramp Rat~
AND ENTER desired        and enters a desired rate that rate not to exceed 60    does not exceed 60 deg F/hr, deg F/hr.
and initials Step.
Page 4of10


===2.0 PREREQUISITES===
JPM NUMBER:    ~~~~~~~~~-
AC008                            NAME:  ~~~~~~~~~~~~~~~~-
REV NUMBER:                01                              DATE:
(*Critical Step)                      COMMENTS STEP                                                                              SAT/
ELEMENT                          (#Sequential Step)                      (Required for NUMBER                                                                          UNSAT STANDARD                              UNSAT)@
: 3. SELECT [em~erature/      *#operator selects tfemperatur~
AND ENTER desired        and enters a value for the temperature.              desired temperature, and initials Step.
Examiner Note: Desired temperature is approximately 470F
:t20F.
: 4. SELECT Reactor            *#operator selects Reactor Cooldown /ON/ AND        Cooldown /ON/,
VERIFY Rx Cooldown Controlling indication is verifies Rx Cooldown Controlling observed.                indication is observed, and initials Step.
: 5. MAINTAIN Throttle        Operator maintains Throttle Pressure Set, Pressure    Pressure Set, Pressure Setpoint Setpoint approximately    approximately 50-100 psig above 50-100 psig above        Throttle Pre?"sure not to exceed Throttle Pressure not to  905 psig, and initials Step.
exceed 905 psig.
Examiner Note: Pressure Setpoint is currently 905 psig.
CUE:    WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.
REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
STOP TIME:
Task Standard: Operator establishes a cooldown in accordance with Step 5.2.1.B of HC.OP-10.ZZ-0004.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]
Page 5of10


ENSURE all personnel who are Operator completes Attachment 1, to perform any step(s) in this Section 1.0, prior to performing any procedure have completed part of this procedure, and initials Attachment 1, Section 1.0, prior Step. to performing any part of this ' procedure.
JOB PERFORMANCE MEASURE STATION: Hope Creek                                 2016 NRC EXAM                    Copy _ _ of _ _
Operator determines beginning Operator determines correct step of the procedure.
JPM D SYSTEM:   High Pressure Coolant Injection TASK NUMBER:     2060180201 TASK: Place HPCI in Full Flow Test Operation JPM NUMBER: 305H-JPM.BJ014                                                 REVISION: 04 SAP BET:   NOH05JPBJ14E KIA NUMBER:   206000 A4. Ability to manually operate and/or monitor in the control room:
beginning step to be 5.2.1.B. NOTE Steam Loads, Decay Heat, and Operator reads and initials NOTE. Feed will directly affect Cooldown I Depressurization.
(CFR: 41. 7 I 45.5 TO 45.8)
Impact of these variables, ,, regardless of DEHC Control mode selected, MUST be continuously evaluated for impact on the cooldown.
A4.06 Reactor pressure: BWR-2,3,4 IMPORTANCE FACTOR:             RO: 4.3     SRO: 4.3 ALTERNATE PATH:    [8J APPLICABILITY:                    RO  [8J                            SRO   [8J EVALUATION SETTING/METHOD: Simulator/Perform
The cooldown rate should be limited to 60&deg;F per hour when above 200 psig to preclude RWCU flashing.
At approximately 200 psig reactor pressure, the cooldown rate should be limited to approximately 30&deg; F/hr to prevent excessive cavitation of the RWCU pump. Page 3of10 JPM NUMBER: AC008 NAME: REV NUMBER: 01 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)(a) 5.2.1. CONTINUE/MAINTAIN a cooldown rate of::; 60&deg;F/hr using Rx Cooldown mode, Pressure Control mode OR Bypass Valve Manual Jack as follows: A. Establish PRESSURE Operator determines and marks CONTROL as ... this Step as N/A. NOTE When Rx Cooldown mode is Operator reads and initials NOTE. initiated with a bypass valve open, a minor Pressure Rise will occur. This pressure rise should be anticipated when placing Rx Cooldown controller in service. Any cooldown that has occurred since the shutdown must be considered prior to ' establishing Rx Cooldown mode in determining initial cooldown so as NOT to exceed 60&deg;F/hr. Once Rx Cooldown mode is established, the INTENT is to remain on the Rx Cooldown controller for the duration of the Cooldown I Depressurization.
An In-Progress Cooldown can be interrupted to support plant manipulations without exiting the Rx Cooldown mode by establishing the temperature Setpoint at the desired hold point on the Cooldown Controller.
5.2.1.B. B. IF desired, Establish
*#operator selects !control! , REACTOR COOLDOWN and IRX Cooldown I. as follows: 1. SELECT IControll , and initials Step. IRX Cooldownl
: 2. SELECT jRamp
*#operator selects !Ramp AND ENTER desired and enters a desired rate that rate not to exceed 60 does not exceed 60 deg F/hr, deg F/hr. and initials Step. Page 4of10 JPM NUMBER: AC008 NAME:
REV NUMBER: 01 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ 3. SELECT
*#operator selects AND ENTER desired and enters a value for the temperature.
desired temperature, and initials Step. Examiner Note: Desired temperature is approximately 470F :t20F. 4. SELECT Reactor *#operator selects Reactor Cooldown /ON/ AND Cooldown /ON/, VERIFY Rx Cooldown Controlling indication is verifies Rx Cooldown Controlling observed.
indication is observed, and initials Step. 5. MAINTAIN Throttle Operator maintains Throttle Pressure Set, Pressure Pressure Set, Pressure Setpoint Setpoint approximately approximately 50-100 psig above 50-100 psig above Throttle Pre?"sure not to exceed Throttle Pressure not to 905 psig, and initials Step. exceed 905 psig. Examiner Note: Pressure Setpoint is currently 905 psig. CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME. REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
STOP TIME: Task Standard:
Operator establishes a cooldown in accordance with Step 5.2.1.B of HC.OP-10.ZZ-0004.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments.
[IER L 1-11-3 Rec. 3b] Page 5of10 JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: High Pressure Coolant Injection TASK NUMBER: 2060180201 TASK: Place HPCI in Full Flow Test Operation JPM NUMBER: 305H-JPM.BJ014 SAP BET: NOH05JPBJ14E 2016 NRC EXAM JPM D Copy __ of __ REVISION:
04 KIA NUMBER: 206000 A4. Ability to manually operate and/or monitor in the control room: (CFR: 41. 7 I 45.5 TO 45.8) A4.06 Reactor pressure:
BWR-2,3,4 ALTERNATE PATH: [8J APPLICABILITY:
RO [8J IMPORTANCE FACTOR: RO: 4.3 SRO: 4.3 SRO [8J EVALUATION SETTING/METHOD:
Simulator/Perform  


==REFERENCES:==
==REFERENCES:==
HC.OP-AB.ZZ-0001, Rev 31 TOOLS, AND EQUIPMENT:      None ESTIMATED COMPLETION TIME: - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:            --    N/A
                                                                                          - - Minutes JPM PERFORMED BY:                                                  GRADE: SAT      D      UNSAT D ACTUAL COMPLETION TIME:        ----
Minutes ACTUAL TIME CRITICAL COMPLETION TIME:            ----
N/A    Minutes REASON IF UNSATISFACTORY:
EVALUATOR:                                                            DATE:
Signature Page 1of13


HC.OP-AB.ZZ-0001, Rev 31 TOOLS, AND EQUIPMENT:
JOB PERFORMANCE MEASURE SYSTEM:     High Pressure Coolant Injection TASK NUMBER:       2060180201 TASK:   Place HPCI in Full Flow Test Operation INITIAL CONDllTONS:
None ESTIMATED COMPLETION TIME: 13 Minutes ----TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes ----JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: Minutes ----ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes ----REASON IF UNSATISFACTORY:
: 1. The Reactor has scrammed due to a spurious Group 1 isolation.
EVALUATOR:
: 2. All control rods are full in.
DATE: Signature Page 1of13 JOB PERFORMANCE MEASURE SYSTEM: High Pressure Coolant Injection TASK NUMBER: 2060180201 TASK: Place HPCI in Full Flow Test Operation INITIAL CONDllTONS:  
: 3. RCIC has automatically initiated on low reactor water level and is injecting to the RPV.
: 1. The Reactor has scrammed due to a spurious Group 1 isolation.  
: 4. HPCI has automatically initiated on low reactor water level.
: 2. All control rods are full in. 3. RCIC has automatically initiated on low reactor water level and is injecting to the RPV. 4. HPCI has automatically initiated on low reactor water level. 5. Reactor water level is currently approximately-10 inches and slowly rising. 6. RHR Loop Bis in Suppression Pool Cooling. 7. Another operator is controlling RPV level and pressure.
: 5. Reactor water level is currently approximately-10 inches and slowly rising.
INITIATING CUE: PLACE HPCI into the Full Flow Test Mode in order to commence a plant cooldown in accordance with HC.OP-AB.ZZ-0001 (Q), Attachment  
: 6. RHR Loop Bis in Suppression Pool Cooling.
: 6. The simulator will remain in FREEZE until you are ready to start the task. Page 2of13 JPM NUMBER: BJ014 NAME:
: 7. Another operator is controlling RPV level and pressure.
REV NUMBER: 04 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ CUE: PROVIDE the operator the initiating cue, ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue AND states ready to begin. START TIME: CUE: PLACE the simulator in RUN, and inform the Operator that the simulator is in RUN. Operator obtains and locates Operator obtains the correct procedure.
INITIATING CUE:
procedure.
PLACE HPCI into the Full Flow Test Mode in order to commence a plant cooldown in accordance with HC.OP-AB.ZZ-0001 (Q), Attachment 6.
NOTE Loss of 1AD481, 1CD481, Operator reads and initials NOTE. 1AD482, or 1CD482 may affect controls and indication.
The simulator will remain in FREEZE until you are ready to start the task.
Operator determines beginning Operator determines correct step of the procedure.
Page 2of13
beginning step to be 2.0 on page 6 of 6. 2.0 lE HPCI is in the Injection Mode of Operati,an, THEN PERFORM the following:
 
A. IF necessary, RESET HPCI *operator depresses the RESET INITIATION LOGIC. HPCI INITIATION LOGIC pushbutton, and initials Step. B. ADJUST FIC R600 HPCI Operator observes zero % FLOW (STPT) to indication is reached on FIC-R600, zero% and initials Step. Examiner Note: Setpoint is already at zero%. C. WHEN FLOW indicates  
JPM NUMBER:   ~~~~~~~~~-
*operator observes zero gpm is zero gpm THEN CLOSE reached, and depresses the HV-F006. CLOSE pushbutton for HV-F006, and initials Step. Examiner Note: HPCI flow is currently zero gpm. D. CLOSE HV-8278. *operator depresses the CLOSE pushbutton for HV-8278, E. ENSURE HPCI AND RCIC Operator observes HPCI AND Suctions are lined up to the RCIC Suctions are lined up to the CST. CST. (OPEN lights for BJ-HV-F004 and BD-HV-F010 are illuminated) and initials Step. Page 3of13 JPM NUMBER: BJ014 NAME:
BJ014                         NAME:   ~~~~~~~~~~~~~~~~-
REV NUMBER: 04 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ F. PRESS HV-F008 INCR PB *operator depresses the INCR for == 20 seconds pushbutton for approximately 20 seconds and observes the OPEN light illuminate, resulting in dual indication for the FOOS, and initials Step. Examiner Note: Any timing method is acceptable, as the time requirement is "approximately" 20 seconds. G. OPEN AP-HV-F011.  
REV NUMBER:                   04                           DATE:
*operator depresses the AP-HV-F011 OPEN pushbutton, and initials Step. Examiner Note: Pressing the AP-HV-F011 pushbutton will activate ET-1, starting a slow rise in Suppression Pool water level. I H. ADJUST FIC-R600 *operator depresses the Raise setpoint to achieve 3000 and/or Lower Setpoint gpm flow. Pushbutton(s) until HPCI flow indicates approximately 3000 gpm on FIC-R600, and initials Step. Examiner Note: WHEN Suppression Pool Water Level reaches 78.5 inches, Overhead Annunciator B1-C3 SUPPRESSION POOL LEVEL HI/LO alarm and HPCI suction transfer occur. Performance of the next Step may/may not be observed.
(*Critical Step)                 COMMENTS STEP                                                                        SAT/
J. THROTTLE HV-F008 AND Operator throttles and adjusts FIC-ADJUST FIC-R600 R600 setpoint, as necessary, up to setpoint, as necessary, up and including full flow rate, to to and including full flow control HPCI pump parameters/
ELEMENT                       (#Sequential Step)                 (Required for NUMBER                                                                        UNSAT STANDARD                         UNSAT)@
CUE: PROVIDE the operator the initiating cue, ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue AND states ready to begin.
START TIME:
CUE: PLACE the simulator in RUN, and inform the Operator that the simulator is in RUN.
Operator obtains and locates     Operator obtains the correct procedure.                         procedure.
NOTE   Loss of 1AD481, 1CD481,           Operator reads and initials NOTE.
1AD482, or 1CD482 may affect controls and indication.
Operator determines beginning     Operator determines correct step of the procedure.             beginning step to be 2.0 on page 6 of 6.
2.0 lE HPCI   is in the Injection Mode of Operati,an, THEN PERFORM the following:
A. IF necessary, RESET HPCI       *operator depresses the RESET INITIATION LOGIC.             HPCI INITIATION LOGIC pushbutton, and initials Step.
B. ADJUST FIC R600 HPCI           Operator observes zero %
FLOW setp~int (STPT) to       indication is reached on FIC-R600, zero%                       and initials Step.
Examiner Note: Setpoint is already at zero%.
C. WHEN FLOW indicates           *operator observes zero gpm is zero gpm THEN CLOSE           reached, and depresses the HV-F006.                     CLOSE pushbutton for HV-F006, and initials Step.
Examiner Note: HPCI flow is currently zero gpm.
D. CLOSE HV-8278.                 *operator depresses the CLOSE pushbutton for HV-8278, E. ENSURE HPCI AND RCIC           Operator observes HPCI AND Suctions are lined up to the RCIC Suctions are lined up to the CST.                         CST. (OPEN lights for BJ-HV-F004 and BD-HV-F010 are illuminated) and initials Step.
Page 3of13
 
JPM NUMBER:                   BJ014                       NAME:   ~~~~~~~~~~~~~~~~~
REV NUMBER:                     04                         DATE:
(*Critical Step)                           COMMENTS STEP                                                                              SAT/
ELEMENT                     (#Sequential Step)                           (Required for NUMBER                                                                            UNSAT STANDARD                                 UNSAT)@
F. PRESS HV-F008 INCR PB       *operator depresses the INCR for == 20 seconds           pushbutton for approximately 20 seconds and observes the OPEN light illuminate, resulting in dual indication for the FOOS, and initials Step.
Examiner Note: Any timing method is acceptable, as the time requirement is "approximately" 20 seconds.
G. OPEN AP-HV-F011.           *operator depresses the AP-HV-F011 OPEN pushbutton, and initials Step.
Examiner Note: Pressing the AP-HV-F011 pushbutton will activate ET-1, starting a slow rise in Suppression Pool water level.                                                                 I H. ADJUST FIC-R600             *operator depresses the Raise setpoint to achieve 3000   and/or Lower Setpoint gpm flow.                   Pushbutton(s) until HPCI flow indicates approximately 3000 gpm on FIC-R600, and initials Step.
Examiner Note: WHEN Suppression Pool Water Level reaches 78.5 inches, Overhead Annunciator B1-C3 SUPPRESSION POOL LEVEL HI/LO alarm and HPCI suction transfer occur. Performance of the next Step may/may not be observed.
J. THROTTLE HV-F008 AND       Operator throttles and adjusts FIC-ADJUST FIC-R600             R600 setpoint, as necessary, up to setpoint, as necessary, up and including full flow rate, to to and including full flow control HPCI pump parameters/
rate, to control HPCI pump reactor pressure.
rate, to control HPCI pump reactor pressure.
parameters/reactor pressure.
parameters/reactor pressure.
Page 4of13 JPM NUMBER: REV NUMBER: STEP NUMBER BJ014 04 ELEMENT NAME:
Page 4of13
DATE: (*Critical Step) (#Sequential Step) STANDARD Operator identifies HPCI Suction Swap is occurring based on OHA B1-C3 and HPCI Pump suction auto-transferring from the CST (HV-F004) to the Torus (HV-F042).
 
Operator announces  
JPM NUMBER:                   BJ014                            NAME:    ~~~~~~~~~~~~~~~~~
'Suppression Pool Level Hi(/Lo)', and informs CRS. Examiner Note: The following actions may be performed by the Operator using the guidance from HC.OP-AB.ZZ-0001, Attachment 6 section for HPCI Suction Transfer to CST without/prior to direction from the CRS based on the direction in step 1.0 of that section. SAT/ UNSAT COMMENTS (Required for UNSAT)@ Operator identifies the need to perform HC.OP-AB.ZZ-0001, Attachment 6 section for HPCI Suction Transfer to CST and take the required actions from that section. I CUE: IF necessary, DIRECT the Operator to transfer HPCI suction back to the CST and place HPCI in Full Flow Test mode to continue plant cooldown in accordance with HC.OP-AB.ZZ-0001.
REV NUMBER:                   04                               DATE:
1.0 Loss of 1AD481 may affect controls and indication.
(*Critical Step)                   COMMENTS STEP                                                                                SAT/
lE a HPCI Suction Transfer has occurred while in Full Flow Test, OR HPCI is in Full Flow Test AND a Suction Swap is anticipated, THEN PERFORM the following:
ELEMENT                          (#Sequential Step)                   (Required for NUMBER                                                                                UNSAT STANDARD                           UNSAT)@
A. ADJUST FIC R600 Flow Setpoint to zero gpm. B. lE required, CLOSE HV-F011. C. WHEN Suction Swap to Suppression Pool is completed, (HV-F042 OPEN, HV-F004 and HV-F011 are CLOSED) THEN PROCEED in this Attachment.
Operator identifies HPCI Suction Swap is occurring based on OHA B1-C3 and HPCI Pump suction auto-transferring from the CST (HV-F004) to the Torus (HV-F042).
Operator reads and initials NOTE. *operator depresses the Lower Setpoint Pushbutton until zero gpm flow indication is reached on FIC-R600, and initials Step. Operator may depress the CLOSE Pb for AP-HV-F011, and initials Step. Examiner Note: Valve will auto close when BJ-HV-F042 is full open. Operator observes position indication and when the CST Suction valve HV-F004 indicates CLSD and the Torus Suction valve HV-F042 indicates open, and initials Step. Page 5of13 JPM NUMBER: BJ014 NAME:
Operator announces 'Suppression Pool Level Hi(/Lo)', and informs CRS.
REV NUMBER: 04 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@, 2.0 PRESS HV-F042 AUTO OPEN *operator depresses the OVRD OVRD Pushbutton AND Pb for HV-F042, VERIFY the HV-F042 OVRD Light is LIT. and initials Step. 3.0 IF a HPCI Initiation Signal is Operator identifies that the HPCI present, THEN PERFORM the Initiation Signal is NOT present, following:
Examiner Note: The following actions may be performed by the Operator using the guidance from HC.OP-AB.ZZ-0001, Attachment 6 section for HPCI Suction Transfer to CST without/prior to direction from the CRS based on the direction in step 1.0 of that section.
marks Step as N/A, and proceeds to Step 4.0. Examiner Note: The initiation signal was reset during the initial actions to place HPCI in Full Flow Test. 4.0 IF a HPCI Initiation Signal is NOT present, THEN PERFORM the following:  
Operator identifies the need to perform HC.OP-AB.ZZ-0001, Attachment 6 section for HPCI Suction Transfer to CST and take the required actions from that section.
*operator depresses the HV-A. PRESS the HV-F042 F042 CLOSE Pb, CLOSE Pushbutton and initials Step. ' B. WHEN HV-F042 indicates Operator observes both the OPEN dual position, THEN OPEN and CLSD lights are illuminated for HV-F004. HV-F042, *operator depresses the HV-F004 OPEN Pb, and initials Step. CUE: IF the CRS is asked about restoring HPCI to full flow test, DIRECT the Operator to restore HPCI to the Full Flow Test mode to continue plant cooldown.
I CUE:     IF necessary, DIRECT the Operator to transfer HPCI suction back to the CST and place HPCI in Full Flow Test mode to continue plant cooldown in accordance with HC.OP-AB.ZZ-0001.
5.0 !E required, RESTORE HPCI to *operator depresses the Raise Full Flow Test as follows: and/or Lower Setpoint A. ADJUST FIC-R600 HPCI Pushbutton(s) until HPCI flow FLOW setpoint to 1000 setpoint indicates approximately gpm. 1000 gpm on FIC-R600, and initials Step. B. IMMEDIATELY OPEN AP-*operator depresses the AP-HV-HV-F011. F011 OPEN pushbutton, and initials Step. Page 6of13 JPM NUMBER: BJ014 NAME:
Loss of 1AD481 may affect           Operator reads and initials NOTE.
REV NUMBER: 04 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ C. WHEN Discharge Pressure WHEN HPCI discharge pressure turns ADJUST FIC-R600 begins to lower, Operator setpoint to 3000 gpm. depresses the Raise and/or Lower Setpoint Pushbutton(s) until HPCI flow setpoint indicates approximately 3000 gpm on FIG-R600, and initials Step. Examiner note: The termination statement by the Operator may be a report to the CRS that HPCI is in Full Flow Test mode of operation.
controls and indication.
At that time it is acceptable to terminate the JPM. D. THROTTLE HV-F008 AND Operator throttles and adjusts FIG-ADJUST FIC-R600 R600 setpoint, as necessary, up to setpoint, as necessary, to and including full flow rate, to control HPCI pump control HPCI pump parameters/
1.0      lE a HPCI Suction Transfer has occurred while in Full Flow Test, OR HPCI is in Full Flow       *operator depresses the Lower Test AND a Suction Swap is         Setpoint Pushbutton until zero anticipated, THEN PERFORM gpm flow indication is reached the following:                     on FIC-R600, A. ADJUST FIC R600 Flow             and initials Step.
parameters/reactor reactor pressure.
Setpoint to zero gpm.
pressure.  
B. lE required, CLOSE AP-         Operator may depress the CLOSE HV-F011.                      Pb for AP-HV-F011, and initials Step.
' CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME. REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
Examiner Note: Valve will auto close when BJ-HV-F042 is full open.
STOP TIME: Task Standard:
C. WHEN Suction Swap to            Operator observes position Suppression Pool is            indication and when the CST completed, (HV-F042          Suction valve HV-F004 indicates OPEN, HV-F004 and AP-        CLSD and the Torus Suction valve HV-F011 are CLOSED)            HV-F042 indicates open, and THEN PROCEED in this          initials Step.
Operator places HPCI in Full Flow Test mode and returns to Full Flow Test mode after HPCI Suction Transfer to CST in accordance with HC.OP-AB.ZZ-0001.  
Attachment.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments.  
Page 5of13
[IER L 1-11-3 Rec. 3b] Page 7of13 JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Residual Heat Removal TASK NUMBER: 4000400401 2016 NRC EXAM JPM E Copy __ of __ TASK: Respond To A Loss Of Shutdown Cooling JPM NUMBER: 305H-JPM.BC003 REVISION:
 
09 SAP BET: NOH05JPBC03E K/A NUMBER: 205000 A2. Ability to (a) predict the impacts of the following on the SHUTDOWN COOLING SYSTEM (RHR SHUTDOWN COOLING MODE); and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR: 41.5 I 45.6) A2.06 SDC/RHR pump trips IMPORTANCE FACTOR: RO: 3.4 SRO: 3.5 ALTERNATE PATH: D APPLICABILITY: EVALUATION SETTING/METHOD:
JPM NUMBER:             BJ014                         NAME:   ~~~~~~~~~~~~~~~~-
Simulator/Perform  
REV NUMBER:                 04                           DATE:
(*Critical Step)                     COMMENTS STEP                                                                        SAT/
ELEMENT                       (#Sequential Step)                     (Required for NUMBER                                                                      UNSAT STANDARD                             UNSAT)@,
2.0 PRESS HV-F042 AUTO OPEN         *operator depresses the OVRD OVRD Pushbutton AND             Pb for HV-F042, VERIFY the HV-F042 OVRD Light is LIT.                   and initials Step.
3.0 IF a HPCI Initiation Signal is Operator identifies that the HPCI present, THEN PERFORM the       Initiation Signal is NOT present, following:                     marks Step as N/A, and proceeds to Step 4.0.
Examiner Note: The initiation signal was reset during the initial actions to place HPCI in Full Flow Test.
4.0 IF a HPCI Initiation Signal is NOT present, THEN PERFORM the following:         *operator depresses the HV-A. PRESS the HV-F042         F042 CLOSE Pb, CLOSE Pushbutton           and initials Step.
B. WHEN HV-F042 indicates       Operator observes both the OPEN dual position, THEN OPEN   and CLSD lights are illuminated for HV-F004.                   HV-F042,
                                        *operator depresses the HV-F004 OPEN Pb, and initials Step.
CUE: IF the CRS is asked about restoring HPCI to full flow test, DIRECT the Operator to restore HPCI to the Full Flow Test mode to continue plant cooldown.
5.0 !E required, RESTORE HPCI to   *operator depresses the Raise Full Flow Test as follows:     and/or Lower Setpoint A. ADJUST FIC-R600 HPCI         Pushbutton(s) until HPCI flow FLOW setpoint to 1000     setpoint indicates approximately gpm.                       1000 gpm on FIC-R600, and initials Step.
B. IMMEDIATELY OPEN AP-         *operator depresses the AP-HV-HV-F011.                   F011 OPEN pushbutton, and initials Step.
Page 6of13
 
JPM NUMBER:     ~~~~~~~~~-
BJ014                           NAME:   ~~~~~~~~~~~~~~~~-
REV NUMBER:                 04                               DATE:
(*Critical Step)                       COMMENTS STEP                                                                            SAT/
ELEMENT                         (#Sequential Step)                       (Required for NUMBER                                                                            UNSAT STANDARD                             UNSAT)@
C. WHEN Discharge Pressure         WHEN HPCI discharge pressure turns ADJUST FIC-R600         begins to lower, Operator setpoint to 3000 gpm.         depresses the Raise and/or Lower Setpoint Pushbutton(s) until HPCI flow setpoint indicates approximately 3000 gpm on FIG-R600, and initials Step.
Examiner note: The termination statement by the Operator may be a report to the CRS that HPCI is in Full Flow Test mode of operation.
At that time it is acceptable to terminate the JPM.
D. THROTTLE HV-F008 AND           Operator throttles and adjusts FIG-ADJUST FIC-R600               R600 setpoint, as necessary, up to setpoint, as necessary, to   and including full flow rate, to control HPCI pump             control HPCI pump parameters/
parameters/reactor           reactor pressure.
pressure.
CUE:   WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.
REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
STOP TIME:
Task Standard: Operator places HPCI in Full Flow Test mode and returns to Full Flow Test mode after HPCI Suction Transfer to CST in accordance with HC.OP-AB.ZZ-0001.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]
Page 7of13
 
JOB PERFORMANCE MEASURE STATION: Hope Creek                                 2016 NRC EXAM                      Copy _ _ of _ _
JPM E SYSTEM:   Residual Heat Removal TASK NUMBER:   4000400401 TASK: Respond To A Loss Of Shutdown Cooling JPM NUMBER: 305H-JPM.BC003                                                   REVISION: 09 SAP BET:   NOH05JPBC03E K/A NUMBER:   205000 A2. Ability to (a) predict the impacts of the following on the SHUTDOWN COOLING SYSTEM (RHR SHUTDOWN COOLING MODE); and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR: 41.5 I 45.6)
A2.06 SDC/RHR pump trips IMPORTANCE FACTOR:             RO: 3.4     SRO: 3.5 ALTERNATE PATH:   D APPLICABILITY:                     RO~                                    SRO~
EVALUATION SETTING/METHOD: Simulator/Perform


==REFERENCES:==
==REFERENCES:==
HC.OP-AB.RPV-0009, Rev. 11 TOOLS, AND EQUIPMENT:      None ESTIMATED COMPLETION TIME:            ---  8 - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:                --  N/A- - Minutes JPM PERFORMED BY:                                                      GRADE: SAT      D    UNSAT D ACTUAL COMPLETION TIME: - - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME:                    N/A
                                                                                    --    - - Minutes REASON IF UNSATISFACTORY:
EVALUATOR:                                                                DATE:
Signature Page 1of9


HC.OP-AB.RPV-0009, Rev. 11 ' TOOLS, AND EQUIPMENT:
JOB PERFORMANCE MEASURE SYSTEM:     Residual Heat Removal TASK NUMBER:       4000400401 TASK:   Respond To A Loss Of Shutdown Cooling INITIAL CONDllTONS:
None ESTIMATED COMPLETION TIME: 8 Minutes -----TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes ----JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: Minutes -----ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes ----REASON IF UNSATISFACTORY:
: 1. The plant was is OPCON 4.
EVALUATOR:
: 2. The reactor has been shut down for 200 hours.
DATE: Signature Page 1of9 JOB PERFORMANCE MEASURE SYSTEM: Residual Heat Removal TASK NUMBER: 4000400401 TASK: Respond To A Loss Of Shutdown Cooling INITIAL CONDllTONS:  
: 3. RHR Pump B was in shutdown cooling at 10,000 gpm for several days.
: 1. The plant was is OPCON 4. 2. The reactor has been shut down for 200 hours. 3. RHR Pump B was in shutdown cooling at 10,000 gpm for several days. 4. RCS temperature was 120F. 5. A worker inadvertently tripped the RHR Pump B breaker locally. 6. The breaker has been inspected and is undamaged.  
: 4. RCS temperature was 120F.
: 7. The Shutdown Cooling suction line did NOT isolate. 8. NSSSS and PCIS are reset. 9. The pump has been tripped for 5 minutes. 10. HC.OP-AB.RPV-0009 Shutdown Cooling is being implemented.
: 5. A worker inadvertently tripped the RHR Pump B breaker locally.
INITIATING CUE: PERFORM Condition A, Steps A.5 and A.6, of HC.OP-AB.RPV-0009.
: 6. The breaker has been inspected and is undamaged.
The required shutdown cooling flow for the 'B' RHR pump is between 9500 -10,000 gpm. Page 2of9 JPM NUMBER: BC003 NAME:
: 7. The Shutdown Cooling suction line did NOT isolate.
REV NUMBER: 09 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ CUE: PROVIDE the operator the initiating cue AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue. START TIME: Operator obtains and locates Operator obtains the correct . procedure HG.OP AB.RPV-procedure.
: 8. NSSSS and PCIS are reset.
0009. Operator determines beginning Operator determines correct step of the procedure.
: 9. The pump has been tripped for 5 minutes.
beginning step to be A.5. A.5 ENSURE the following:
: 10. HC.OP-AB.RPV-0009 Shutdown Cooling is being implemented.
* HV-F008, HV-F009 and Operator determines the HV-F008, HV-F006A(B) are OPEN. (If HV-F009, and HV-F006B are open necessary, dispatch by observing the red OPEN lights operators to operate are illuminated and green CLSD manually).
INITIATING CUE:
lights are extinguished, and initials [CD-065X]
PERFORM Condition A, Steps A.5 and A.6, of HC.OP-AB.RPV-0009.
Step. '
The required shutdown cooling flow for the 'B' RHR pump is between 9500 -10,000 gpm.
* HV-F006B(A) and HV-Operator determines the HV-FOO? A(B) are CLOSED. F006A is closed by observing the red OPEN lights are extinguished and green CLSD lights are illuminated, and initials Step. A.6 RESTORE tripped RHR pump *#operator presses the HV-as follows: F015B DECR pushbutton until a. CLOSE F015A(B).
Page 2of9
the OPEN light extinguishes, and initials Step. b. RESTART RHR Pump *#operator presses the BP202 A(B). START push button, observes the RUNNING indicator illuminates and the STOPPED indicator extinguishes, and initials Step. c. IMMEDIATELY  
 
*#operator presses HV-F015B THROTTLE OPEN INCR pushbutton until Shutdown F015A(B) to establish Cooling flow is between 9500 Shutdown Cooling flow gpm and 10,000 gpm, between 3000 gpm and 10,000 gpm. and initials Step. Page 3 of 9 JPM NUMBER: BC003 NAME:
JPM NUMBER:   ~~~~~~~~~-
REV NUMBER: 09 0 ATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME. REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
BC003                             NAME:   ~~~~~~~~~~~~~~~~-
STOP TIME: Task Standard:
REV NUMBER:               09                               DATE:
Operator performs Steps A.5 and A.6 of HC.OP-AB.RPV-0009.  
(*Critical Step)               COMMENTS STEP                                                                            SAT/
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments.  
ELEMENT                       (#Sequential Step)                 (Required for NUMBER                                                                          UNSAT STANDARD                       UNSAT)@
[IER L 1-11-3 Rec. 3b] Page 4of9 JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: System TASK NUMBER: 3620190101 2016 NRC EXAM JPM F Copy __ of __ TASK: Shift A 4160 V 1 E Bus To Alternate Feeder JPM NUMBER: 305H-JPM.PB001 SAP BET: NOH05JPPB01 E K/A NUMBER: 262001 A4.01 ALTERNATE PATH: APPLICABILITY: REVISION:
CUE:   PROVIDE the operator the initiating cue AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue.
00 IMPORTANCE FACTOR: RO: 3.4 SRO: 3.7 EVALUATION SETTING/METHOD:
START TIME:
Simulator/Perform  
Operator obtains and locates     Operator obtains the correct                             .
procedure HG.OP AB.RPV-           procedure.
0009.
Operator determines beginning     Operator determines correct step of the procedure.           beginning step to be A.5.
A.5   ENSURE the following:
* HV-F008, HV-F009 and         Operator determines the HV-F008, HV-F006A(B) are OPEN. (If     HV-F009, and HV-F006B are open necessary, dispatch           by observing the red OPEN lights operators to operate         are illuminated and green CLSD manually).                   lights are extinguished, and initials
[CD-065X]                     Step.
* HV-F006B(A) and HV-           Operator determines the HV-FOO? A(B) are CLOSED.         F006A is closed by observing the red OPEN lights are extinguished and green CLSD lights are illuminated, and initials Step.
A.6   RESTORE tripped RHR pump         *#operator presses the HV-as follows:                       F015B DECR pushbutton until
: a. CLOSE F015A(B).               the OPEN light extinguishes, and initials Step.
: b. RESTART RHR Pump             *#operator presses the BP202 A(B).                         START push button, observes the RUNNING indicator illuminates and the STOPPED indicator extinguishes, and initials Step.
: c. IMMEDIATELY                   *#operator presses HV-F015B THROTTLE OPEN                 INCR pushbutton until Shutdown F015A(B) to establish         Cooling flow is between 9500 Shutdown Cooling flow         gpm and 10,000 gpm, between 3000 gpm and 10,000 gpm.                   and initials Step.
Page 3 of 9
 
JPM NUMBER:   ~~~~~~~~~-
BC003                             NAME:   ~~~~~~~~~~~~~~~~-
REV NUMBER:               09                               0 ATE:
(*Critical Step)                       COMMENTS STEP                                                                            SAT/
ELEMENT                           (#Sequential Step)                       (Required for NUMBER                                                                          UNSAT STANDARD                             UNSAT)@
CUE:   WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.
REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
STOP TIME:
Task Standard: Operator performs Steps A.5 and A.6 of HC.OP-AB.RPV-0009.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]
Page 4of9
 
JOB PERFORMANCE MEASURE STATION:   Hope Creek                             2016 NRC EXAM          Copy _ _ of _ _
JPM F SYSTEM:   System TASK NUMBER:     3620190101 TASK: Shift A 4160 V 1E Bus To Alternate Feeder JPM NUMBER: 305H-JPM.PB001                                       REVISION: 00 SAP BET:   NOH05JPPB01 E K/A NUMBER:     262001 A4.01                     IMPORTANCE FACTOR:   RO: 3.4   SRO: 3.7 ALTERNATE PATH:    ~
APPLICABILITY:                    RO~                          SRO~
EVALUATION SETTING/METHOD: Simulator/Perform


==REFERENCES:==
==REFERENCES:==
HC.OP-SO.PB-0001, Rev. 29 TOOLS, AND EQUIPMENT:      None ESTIMATED COMPLETION TIME:
                                                                        - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:      N/A    Minutes JPM PERFORMED BY:                                            GRADE: SAT  D    UNSAT D ACTUAL COMPLETION TIME: - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME:      N/A
                                                                        --    - - Minutes REASON IF UNSATISFACTORY:
EVALUATOR:                                                  DATE:
Signature Page 1of10


HC.OP-SO.PB-0001, Rev. 29 TOOLS, AND EQUIPMENT:
JOB PERFORMANCE MEASURE SYSTEM:     System TASK NUMBER:       3620190101 TASK:     Shift A 4160 V 1E Bus To Alternate Feeder INITIAL CONDllTONS:
None ESTIMATED COMPLETION TIME: 15 Minutes ----TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: Minutes ----ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes ----REASON IF UNSATISFACTORY:
: 1. Maintenance is required on the 40201 breaker.
EVALUATOR:
INITIATING CUE:
DATE: Signature Page 1of10 JOB PERFORMANCE MEASURE SYSTEM: System TASK NUMBER: 3620190101 TASK: Shift A 4160 V 1 E Bus To Alternate Feeder INITIAL CONDllTONS:  
SHIFT 10A402 supply to the Alternate Feeder Breaker in accordance with Section 5.6 of HC.OP-SO.PB-
: 1. Maintenance is required on the 40201 breaker. INITIATING CUE: SHIFT 10A402 supply to the Alternate Feeder Breaker in accordance with Section 5.6 of . 0001. Page 2of10 JPM NUMBER: PB001 NAME:
      . 0001.
REV NUMBER: 00 DATE: STEP STANDARD SAT/ COMMENTS NUMBER ELEMENT (*Critical Step) UNSAT (Required for (#Sequential Step) UNSAT)@ CUE: PROVIDE the operator the initiating cue AND ENTER START TIME AFTER Operator repeats back the Initiating Cue. START TIME: Operator obtains and locates Operator obtains the correct procedure.
Page 2of10
procedure.
 
Operator reviews precautions Operator reviews precautions and and limitations.
JPM NUMBER:               PB001                             NAME:   ~~~~~~~~~~~~~~~~~-
limitations.
REV NUMBER:                 00                             DATE:
CUE: IF excessive time is taken reviewing precautions and limitations, THEN INFORM operator that all are satisfied.
STANDARD                      COMMENTS STEP                                                                         SAT/
Operator determines beginning Operator determines correct step of the procedure.
ELEMENT                           (*Critical Step)                 (Required for NUMBER                                                                        UNSAT
beginning step to be 5.6.1 . NOTE The Normal (Alternate)
(#Sequential Step)                 UNSAT)@
Feeder Operator reads and initials NOTE. Breaker should have the AUTO CLOSE BLOCK PB set ' (illuminated) when the breaker ... 5.6.1. ENSURE that the prerequisites Operator completes Attachment 1 of Section 2.6 have been Section 2.0 and ensures that all satisfied.
CUE:   PROVIDE the operator the initiating cue AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.
prerequisites have been satisfied, and initials each prerequisite.
START TIME:
CAUTION When transferring the A vital Operator reads NOTE, determines bus, the CRS should it is not applicable, and initials determine  
Operator obtains and locates     Operator obtains the correct procedure.                       procedure.
... NOTE. 5.6.2. IF desired, OPEN breakers 52-Operator determines that the Step 212071 and 52-212072 for is not applicable, and marks Step RAGS valves 1 EDHV-2598 and as N/A. 1 EDHV-2599.  
Operator reviews precautions     Operator reviews precautions and and limitations.                 limitations.
CUE:   IF excessive time is taken reviewing precautions and limitations, THEN INFORM operator that all are satisfied.
Operator determines beginning     Operator determines correct step of the procedure.           beginning step to be 5.6.1 .
NOTE   The Normal (Alternate) Feeder     Operator reads and initials NOTE.
Breaker should have the AUTO CLOSE BLOCK PB set (illuminated) when the breaker ...
5.6.1. ENSURE that the prerequisites     Operator completes Attachment 1 of Section 2.6 have been         Section 2.0 and ensures that all satisfied.                       prerequisites have been satisfied, and initials each prerequisite.
CAUTION When transferring the A vital     Operator reads NOTE, determines bus, the CRS should               it is not applicable, and initials determine ...                     NOTE.
5.6.2. IF desired, OPEN breakers 52-     Operator determines that the Step 212071 and 52-212072 for         is not applicable, and marks Step RAGS valves 1EDHV-2598 and       as N/A.
1EDHV-2599.
5.6.3. ENSURE Bus Voltage is            Operator refers to HC.OP-DL.ZZ-adjusted to the higher band      0003 and determines Bus Voltage required for the Bus alignment    adjustment is required, prior to transfer AND if necessary, PLACE 1AX501          *#places 1AX501 Tap Changer (1 BX501) Tap Changer in          in Manual and adjusts Bus Manual. (REFER TO HG.OP-          Voltage to 4.276 KV - 4.370 KV DL.ZZ-0002(3)(0), Control        (CRIDS A7066),
Console Log(s))
and initials Step.
Examiner Note: Operator may also place the 1BX501 Tap Changer in Manual in anticipation of future adjustments.
Page 3of10
 
JPM NUMBER:    ~~~~~~~~~
PB001 REV NUMBER:    ~~~~~~~~~
00 STANDARD                    COMMENTS STEP                                                                        SAT/
ELEMENT                        (*Critical Step)              (Required for NUMBER                                                                        UNSAT
(#Sequential Step)                UNSAT) 5.6.4. SHIFT breaker alignment on the desired Class 1 E 4160V busses (listed in Table PB-002, Section 5.4) as follows:
Operator observes the Alternate A. lE the Alternate (Normal)  AUTO CLOSE BLOCK PB AUTO CLOSE BLOCK PB backlight is OFF, and initials Step.
backlight is ON, THEN PRESS the Alternate (Normal) AUTO CLOSE BLOCK AND VERIFY that the PB backlight is OFF.
[CD-056H]
B. PRESS Normal (Alternate)  *#operator presses the 40201 AUTO CLOSE BLOCK            AUTO CLOSE BLOCK PB and AND VERIFY that the PB      verifies that the PB backlight is backlight is OFF. [CD-      OFF, 056H] AND INITIAL Attachment 1.              and initials Step.
C. PRESS CLOSE PB on            *#operator presses CLOSE PB Alternate (Normal) FEED    on Alternate Feed Breaker BRKR.
40208, and initials Step.
D. ENSURE that the Alternate    Operator observes the 40208 (Normal) FEED BRKR        CLOSE PB backlight is lit, and the closes AND that the        TRIP PB is extinguished, and the Normal (Alternate) FEED    40201 CLOSE PB backlight is BRKR trips. AND INITIAL    extinguished and the TRIP PB is lit, Attachment 1.              and initials Attachment 1.
E. PRESS the AUTO CLOSE      *#operator presses the AUTO BLOCK PB for the          CLOSE BLOCK PB for the Alternate (Normal) Feed Alternate Feed Breaker 40208, Breaker AND VERIFY that the AUTO CLOSE BLOCK        verifies that the AUTO CLOSE PB is illuminated. [CD-   BLOCK PB is illuminated, and 056H] AND INITIAL          initials Step.
Attachment 1.
5.6.5. ENSURE Bus Voltage is          Operator refers to HC.OP-DL.ZZ-adjusted, as necessary, within  0003 and determines Bus Voltage required range. (REFER TO      to be within the required range.
HC.OP-DL.ZZ-0002(3)(0),
Control Console Log( s))
Page 4of10


====5.6.3. ENSURE====
JPM NUMBER:     ~~~~~~~~~-
Bus Voltage is Operator refers to HC.OP-DL.ZZ-adjusted to the higher band 0003 and determines Bus Voltage required for the Bus alignment adjustment is required, prior to transfer AND if *#places 1AX501 Tap Changer necessary, PLACE 1 AX501 (1 BX501) Tap Changer in in Manual and adjusts Bus Manual. (REFER TO HG.OP-Voltage to 4.276 KV -4.370 KV DL.ZZ-0002(3)(0), Control (CRIDS A7066), Console Log(s)) and initials Step. Examiner Note: Operator may also place the 1 BX501 Tap Changer in Manual in anticipation of future adjustments.
PB001                         NAME:   ~~~~~~~~~~~~~~~~~
Page 3of10 JPM NUMBER: PB001 REV NUMBER: 00 STANDARD SAT/ COMMENTS STEP ELEMENT (*Critical Step) (Required for NUMBER (#Sequential Step) UNSAT UNSAT) 5.6.4. SHIFT breaker alignment on the desired Class 1 E 4160V busses (listed in Table PB-002, Section 5.4) as follows: A. lE the Alternate (Normal) Operator observes the Alternate AUTO CLOSE BLOCK PB AUTO CLOSE BLOCK PB backlight is OFF, and initials Step. backlight is ON, THEN PRESS the Alternate (Normal) AUTO CLOSE BLOCK AND VERIFY that the PB backlight is OFF. [CD-056H]
REV NUMBER:                   00                           DATE:
B. PRESS Normal (Alternate)
STANDARD                            COMMENTS STEP                                                                           SAT/
*#operator presses the 40201 AUTO CLOSE BLOCK AUTO CLOSE BLOCK PB and AND VERIFY that the PB verifies that the PB backlight is backlight is OFF. [CD-OFF, 056H] AND INITIAL Attachment
ELEMENT                         {*Critical Step)                       (Required for NUMBER                                                                          UNSAT
: 1. and initials Step. ' C. PRESS CLOSE PB on *#operator presses CLOSE PB Alternate (Normal) FEED on Alternate Feed Breaker BRKR. 40208, and initials Step. D. ENSURE that the Alternate Operator observes the 40208 (Normal) FEED BRKR CLOSE PB backlight is lit, and the closes AND that the TRIP PB is extinguished, and the Normal (Alternate)
{#Sequential Step)                         UNSAT)@
FEED 40201 CLOSE PB backlight is BRKR trips. AND INITIAL extinguished and the TRIP PB is lit, Attachment
5.6.6. lE opened   in Step 5.6.2,       Operator determines that this Step CLOSE breakers 52-212071         is not applicable and marks N/A.
: 1. and initials Attachment
and 52-212072 for RAGS isolation valves 1EDHV-2598 and 1EDHV-2599 AND INITIAL Attachment 1.
: 1. E. PRESS the AUTO CLOSE *#operator presses the AUTO BLOCK PB for the CLOSE BLOCK PB for the Alternate (Normal) Feed Alternate Feed Breaker 40208, Breaker AND VERIFY that the AUTO CLOSE BLOCK verifies that the AUTO CLOSE PB is illuminated.
5.6.7. PERFORM independent             Operator provides the procedure verification that the system is for an independent review.
[CD-BLOCK PB is illuminated, and 056H] AND INITIAL initials Step. Attachment
aligned IAW Attachment 1.
: 1. 5.6.5. ENSURE Bus Voltage is Operator refers to HC.OP-DL.ZZ-adjusted, as necessary, within 0003 and determines Bus Voltage required range. (REFER TO to be within the required range. HC.OP-DL.ZZ-0002(3)(0), Control Console Log( s)) Page 4of10 JPM NUMBER: PB001 NAME:
CUE:   WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.
REV NUMBER: 00 DATE: STEP STANDARD SAT/ COMMENTS NUMBER ELEMENT {*Critical Step) UNSAT (Required for {#Sequential Step) UNSAT)@ 5.6.6. lE opened in Step 5.6.2, Operator determines that this Step CLOSE breakers 52-212071 is not applicable and marks N/A. and 52-212072 for RAGS isolation valves 1 EDHV-2598 and 1 EDHV-2599 AND INITIAL Attachment  
REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
: 1. 5.6.7. PERFORM independent Operator provides the procedure verification that the system is for an independent review. aligned IAW Attachment  
STOP TIME:
: 1. CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME. REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
Task Standard: Operator shifts 10A402 supply to the Alternate Feeder in accordance with HC.OP-SO.PB-0001.
STOP TIME: Task Standard:
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]
Operator shifts 10A402 supply to the Alternate Feeder in accordance with HC.OP-SO.PB-0001.  
Page 5of10
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments.  
 
[IER L 1-11-3 Rec. 3b] Page 5of10 JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Control Area Ventilation System TASK NUMBER: 4880060101 TASK: Isolate the Control Room HVAC System JPM NUMBER: 305H-JPM.GK002 SAP BET: NOH05JPGK02E 2016 NRC EXAM JPMG Copy __ of __ REVISION:
JOB PERFORMANCE MEASURE STATION: Hope Creek                                   2016 NRC EXAM                  Copy _ _ of _ _
04 K/A NUMBER: 290003 A4. Ability to manually operate and/or monitor in the control room: (CFR: 41. 7 I 45.5 TO 45.8) A4.01 Initiate/reset system ALTERNATE APPLICABILITY:
JPMG SYSTEM:   Control Area Ventilation System TASK NUMBER:     4880060101 TASK: Isolate the Control Room HVAC System JPM NUMBER: 305H-JPM.GK002                                                 REVISION: 04 SAP BET:   NOH05JPGK02E K/A NUMBER:     290003 A4. Ability to manually operate and/or monitor in the control room:
EVALUATION SETTING/METHOD:  
(CFR: 41. 7 I 45.5 TO 45.8)
A4.01 Initiate/reset system IMPORTANCE FACTOR:          RO: 3.2      SRO: 3.2 ALTERNATE   PATH:~
APPLICABILITY:                     RO~                                SRO~
EVALUATION SETTING/METHOD:


==REFERENCES:==
==REFERENCES:==
HC.OP-AB.HVAC-0002 Rev.10 HC.OP-SO.GK-0001 Rev. 22 TOOLS, AND EQUIPMENT:        None ESTIMATED COMPLETION TIME:              7      Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:                  N/A
                                                                                  --      - - Minutes JPM PERFORMED BY:                                                  GRADE: SAT      D      UNSAT D ACTUAL COMPLETION TIME:
                                                                                  - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME:                  N/A
                                                                                  --      - - Minutes REASON IF UNSATISFACTORY:
EVALUATOR:                                                            DATE:
Signature Page 1 of 11


HC.OP-AB.HVAC-0002 Rev.10 HC.OP-SO.GK-0001 Rev. 22 TOOLS, AND EQUIPMENT:
JOB PERFORMANCE MEASURE SYSTEM:     Control Area Ventilation System TASK NUMBER:       4880060101 TASK:   Isolate the Control Room HVAC System INITIAL CONDllTONS:
None IMPORTANCE FACTOR: RO: 3.2 SRO: 3.2 ESTIMATED COMPLETION TIME: 7 Minutes ----TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes ----JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: Minutes ----ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes ----REASON IF UNSATISFACTORY:
: 1. The plant is at 100% power.
EVALUATOR:
: 2. Control Room Ventilation Train A is in service.
DATE: Signature Page 1 of 11 JOB PERFORMANCE MEASURE SYSTEM: Control Area Ventilation System TASK NUMBER: 4880060101 TASK: Isolate the Control Room HVAC System INITIAL CONDllTONS:  
: 3. The Aux Building Operator has been briefed and is standing by on location.
: 1. The plant is at 100% power. 2. Control Room Ventilation Train A is in service. 3. The Aux Building Operator has been briefed and is standing by on location.  
: 4. Chiller BK400 is ready for a start.
: 4. Chiller BK400 is ready for a start. INITIATING CUE: SWAP Control Room Ventilation Trains IAW Section 5.4 of HC.OP-SO.GK-0001.
INITIATING CUE:
Page 2of11 JPM NUMBER: GK002 NAME:
SWAP Control Room Ventilation Trains IAW Section 5.4 of HC.OP-SO.GK-0001.
REV NUMBER: 04 DATE: STEP STANDARD SAT/ COMMENTS NUMBER ELEMENT (*Critical Step) UNSAT (Required for (#Sequential Step) UNSAT)@ CUE: PROVIDE the operator the initiating cue AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue. START TIME: Operator obtains and locates Operator obtains the correct procedure.
Page 2of11
procedure.
 
Operator reviews precautions Operator reviews precautions and and limitations.
JPM NUMBER:               GK002                           NAME:   ~~~~~~~~~~~~~~~~~-
limitations.
REV NUMBER:                 04                             DATE:
CUE: IF excessive time is taken reviewing precautions and limitations, THEN INFORM operator that all are satisfied.
STANDARD                        COMMENTS STEP                                                                         SAT/
Operator determines beginning Operator determines correct step of the procedure.
ELEMENT                         (*Critical Step)                 (Required for NUMBER                                                                        UNSAT
beginning step to be 5.4.1. 5.4.1 ENSURE that all prerequisites Operator ensures that all have been satisfied IAW prerequisites have been satisfied Section 2.4. ' and initials each. NOTE All operations are performed Operator reads and initials NOTE. from 1 OC651 E unless otherwise noted. Procedure describes transfer from A Control Chilled Water Loop in service to the B Loop in service, values in parentheses used to transfer back to A in service. SACS Pump Room Unit Coolers 1AVH214 AND 1 BVH214 are interlocked to operate in AUTO only IF Chilled Water Pump AP400 is in service. SACS Pump Room Unit Coolers 1CVH214 and 1 DVH214 are interlocked to operate in AUTO only IF Chilled Water Pump BP400 is in service. Page 3of11 JPM NUMBER: GK002 NAME:
(#Sequential Step)                   UNSAT)@
REV NUMBER: 04 DATE: STEP NUMBER 5.4.2 ELEMENT PRESS CH W CIRC PUMP B(A)P400 MAN PB. VERIFY MAN comes on. STANDARD (*Critical Step) (#Sequential Step) *operator presses the BP400 MAN PB, and observes the MAN push button illuminated and the AUTO push button extinguished.
CUE:   PROVIDE the operator the initiating cue AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue.
Examiner Note: Operator may place BP400 in AUTO when proceeding to respond to smoke. SAT/ UNSAT COMMENTS (Required for UNSAT)@ CUE: "REPORT as Yard Operator that there is a large fire north of the HC Million Gallon Fuel Oil Storage Tank and smoke is headed towards the power block." "Light smoke is coming out of the Control Room ventilation supply ductwork into the Main Control Room. [SRO] Take any required actions. [SRO] If requested state, "Implement HC.OP-AB.HVAC-0002 and take any required actions." CUE: ENSURE ET-1 TRIGGERS; advance Fire Computer, OR PROVIDE Fire Computer Alarm Summary. HC.OP-AB.HVAC-0002  
START TIME:
' Operator reviews AB.HVAC-0002 CONTROL ROOM ENVIRONMENT.
Operator obtains and locates     Operator obtains the correct procedure.                       procedure.
EXAMINER NOTE: The directions to HC.OP-AB.HVAC-0002 are contained within HC.OP-AR.QK-0001 (2). The operator may respond to the fire alarm and not go directly to HC.OP-AB.HVAC-0002. CUE: If operator responds to OHA A2-A5 in accordance with HC.OP-AR.ZZ-0002, and HC.OP-AR.QK-0001 /2, respond as appropriate to implement HC.OP-AB.HVAC-0002 and take any required actions. I. Smoke OR Toxic Gases are ENTERING the Control Room from an Outside source. Date/Time:  
Operator reviews precautions     Operator reviews precautions and and limitations.                 limitations.
-----Operator determines Retainment Override Condition I. applies. Page 4of11 JPM NUMBER: GK002 NAME:
CUE:   IF excessive time is taken reviewing precautions and limitations, THEN INFORM operator that all are satisfied.
REV NUMBER: 04 DATE: STEP STANDARD SAT/ COMMENTS NUMBER ELEMENT (*Critical Step) UNSAT (Required for (#Sequential Step) UNSAT)@ I.a. PRESS the ISOLATE PB *#operator presses the for the 1/S Control Room ISOLATE PB for the A Control Ventilation Train. Room Ventilation Train. Operator observes the HD9598A ISOLATE PB for the A Control Room Ventilation Train illuminates.
Operator determines beginning     Operator determines correct step of the procedure.           beginning step to be 5.4.1.
5.4.1   ENSURE that all prerequisites     Operator ensures that all have been satisfied IAW           prerequisites have been satisfied Section 2.4.                     and initials each.
NOTE   All operations are performed     Operator reads and initials NOTE.
from 1OC651 E unless otherwise noted.
Procedure describes transfer from A Control Chilled Water Loop in service to the B Loop in service, values in parentheses used to transfer back to A in service.
SACS Pump Room Unit Coolers 1AVH214 AND 1BVH214 are interlocked to operate in AUTO only IF Chilled Water Pump AP400 is in service. SACS Pump Room Unit Coolers 1CVH214 and 1DVH214 are interlocked to operate in AUTO only IF Chilled Water Pump BP400 is in service.
Page 3of11
 
JPM NUMBER:             GK002                             NAME:
              ~---------                                          ~----------------
REV NUMBER:               04                             DATE:
STANDARD                            COMMENTS STEP                                                                       SAT/
ELEMENT                          (*Critical Step)                      (Required for NUMBER                                                                     UNSAT
(#Sequential Step)                      UNSAT)@
5.4.2 PRESS CH W CIRC PUMP           *operator presses the BP400 B(A)P400 MAN PB. VERIFY         MAN PB, MAN comes on.
and observes the MAN push button illuminated and the AUTO push button extinguished.
Examiner Note: Operator may place BP400 in AUTO when proceeding to respond to smoke.
CUE:   "REPORT as Yard Operator that there is a large fire north of the HC Million Gallon Fuel Oil Storage Tank and smoke is headed towards the power block."
        "Light smoke is coming out of the Control Room ventilation supply ductwork into the Main Control Room.
[SRO] Take any required actions.
[SRO] If requested state, "Implement HC.OP-AB.HVAC-0002 and take any required actions."
CUE:   ENSURE ET-1 TRIGGERS; advance Fire Computer, OR PROVIDE Fire Computer Alarm Summary.
HC.OP-AB.HVAC-0002 Operator reviews HC.OP-AB.HVAC-0002 CONTROL ROOM ENVIRONMENT.
EXAMINER NOTE: The directions to HC.OP-AB.HVAC-0002 are contained within HC.OP-AR.QK-0001 (2). The operator may respond to the fire alarm and not go directly to HC.OP-AB.HVAC-0002.
CUE:   If operator responds to OHA A2-A5 in accordance with HC.OP-AR.ZZ-0002, and HC.OP-AR.QK-0001 /2, respond as appropriate to implement HC.OP-AB.HVAC-0002 and take any required actions.
I. Smoke OR Toxic Gases are         Operator determines Retainment ENTERING the Control Room       Override Condition I. applies.
from an Outside source.
Date/Time:
Page 4of11
 
JPM NUMBER:     ~~~~~~~~~-
GK002                           NAME:   ~~~~~~~~~~~~~~~~~
REV NUMBER:                   04                           DATE:
STANDARD                          COMMENTS STEP                                                                           SAT/
ELEMENT                         (*Critical Step)                   (Required for NUMBER                                                                          UNSAT
(#Sequential Step)                     UNSAT)@
I.a. PRESS the ISOLATE PB         *#operator presses the for the 1/S Control Room     ISOLATE PB for the A Control Ventilation Train.           Room Ventilation Train.
Operator observes the HD9598A ISOLATE PB for the A Control Room Ventilation Train illuminates.
Operator observes the HD9588M and HD9588BA NORMAL ISOLATED lights are illuminated.
Operator observes the HD9588M and HD9588BA NORMAL ISOLATED lights are illuminated.
Operator observes the AV400 START PB illuminates, and the STOP PB extinguish.
Operator observes the AV400 START PB illuminates, and the STOP PB extinguish.
l.b. PRESS the RECIRC PB for *#Operator presses the RECIRC the l/S CREF Unit. PB for AV400. Operator observes the OA DMPR HD9593A OPEN PB extinguish and HD9593A CLOSED PB I illuminate.
l.b. PRESS the RECIRC PB for       *#Operator presses the RECIRC the l/S CREF Unit.           PB for AV400.
CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME. REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
Operator observes the OA DMPR HD9593A OPEN PB extinguish and HD9593A CLOSED PB                                     I illuminate.
STOP TIME: Task Standard:
CUE:   WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.
Operator Isolates the Control Room HVAC System in accordance with HC.OP-AB.HVAC-0002.  
REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments.  
STOP TIME:
[IER L 1-11-3 Rec. 3b] Page 5of11 JOB PERFORMANCE MEASURE STATION: Hope Creek 2016 NRC EXAM JPM H Copy __ of __ SYSTEM: Safety & Turbine Auxiliaries Cooling TASK NUMBER: 3080050101 TASK: Transfer TACS to the Standby SACS Loop JPM NUMBER: 305H-JPM.EG002 SAP BET: NOH05JPEG02E REVISION:
Task Standard: Operator Isolates the Control Room HVAC System in accordance with HC.OP-AB.HVAC-0002.
13 400000 A.4.Ability to manually operate and I or monitor in the control room: KIA NUMBER: (CFR: 41.7 I 45.5 TO 45.8) A4.01 CCW indications and control IMPORTANCE FACTOR: RO: 3.1 SRO: 3.0 ALTERNATE PATH: D APPLICABILITY: EVALUATION SETTING/METHOD:
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]
Simulator/Perform  
Page 5of11
 
JOB PERFORMANCE MEASURE STATION: Hope Creek                               2016 NRC EXAM                     Copy _ _ of _ _
JPM H SYSTEM:   Safety & Turbine Auxiliaries Cooling TASK NUMBER:     3080050101 TASK: Transfer TACS to the Standby SACS Loop JPM NUMBER: 305H-JPM.EG002                                                 REVISION: 13 SAP BET:   NOH05JPEG02E 400000 A.4.Ability to manually operate and I or monitor in the control room:
KIA NUMBER:           (CFR: 41.7 I 45.5 TO 45.8)
A4.01 CCW indications and control IMPORTANCE FACTOR:             RO: 3.1     SRO: 3.0 ALTERNATE PATH:   D APPLICABILITY:                     RO~                                  SRO~
EVALUATION SETTING/METHOD: Simulator/Perform


==REFERENCES:==
==REFERENCES:==
HC.OP-AB.ZZ-0001, Rev. 31 TOOLS, AND EQUIPMENT:      None ESTIMATED COMPLETION TIME:                9
                                                                                  ---      - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:                    N/A    Minutes JPM PERFORMED BY:                                                  GRADE: SAT      D      UNSAT D ACTUAL COMPLETION TIME:
                                                                                  - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME:
                                                                                  - -N/A- - - Minutes REASON IF UNSATISFACTORY:
EVALUATOR:                                                              DATE:
Signature Page 1of11


HC.OP-AB.ZZ-0001, Rev. 31 TOOLS, AND EQUIPMENT:
JOB PERFORMANCE MEASURE SYSTEM:     Safety & Turbine Auxiliaries Cooling TASK NUMBER:       3080050101 TASK:   Transfer T ACS to the Standby SACS Loop INITIAL CONDllTONS:
None ESTIMATED COMPLETION TIME: 9 Minutes -----TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: Minutes ----ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes -----REASON IF UNSATISFACTORY:
: 1. The plant is at 100% power.
EVALUATOR:
: 2. TAGS is being supplied by SACS Loop A.
DATE: Signature Page 1of11 JOB PERFORMANCE MEASURE SYSTEM: Safety & Turbine Auxiliaries Cooling TASK NUMBER: 3080050101 TASK: Transfer T ACS to the Standby SACS Loop INITIAL CONDllTONS:  
: 3. SACS Pump AP210 has developed an oil leak on the inboard pump bearing and there is no oil level in the bubbler.
: 1. The plant is at 100% power. 2. TAGS is being supplied by SACS Loop A. 3. SACS Pump AP210 has developed an oil leak on the inboard pump bearing and there is no oil level in the bubbler. 4. There is no line break in the system. 5. SACS Pump DP210 has been checked for a start. INITIATING CUE: TRANSFER TAGS to the B SACS loop IAW HC.OP-AB.ZZ-0001Attachment10 (Hard Card). STOP SACS Pump AP201. ENSURE SACS cooling is aligned to the A RHR Heat Exchanger AND secured to the B RHR Heat Exchanger.
: 4. There is no line break in the system.
There are no additional operators available to assist in the swap. Page 2of11 JPM NUMBER: EG002 NAME:
: 5. SACS Pump DP210 has been checked for a start.
REV NUMBER: 13 DATE: STEP STANDARD SAT/ COMMENTS NUMBER ELEMENT (*Critical Step) UNSAT (Required for (#Sequential Step) UNSAT)@ CUE: PROVIDE thia operator the initiating cue AND ENTER START TIME AFTER Operator repeats back the Initiating Cue. START TIME: Operator obtains procedure Operator obtains the correct HC.OP-AB.ZZ-0001 procedure.
INITIATING CUE:
Attachment 10, Page 2 of 2, T ACS TRANSFER TO B LOOP. Operator determines beginning Operator enters the Date and step of the procedure.
TRANSFER TAGS to the B SACS loop IAW HC.OP-AB.ZZ-0001Attachment10 (Hard Card).
Time, and determines correct beginning step to be 1.0. 1.0 IF 'A' Loop TAGS is isolating, Operator determines this step is THEN LOCKOUT: not applicable and marks the Steps N/A.
STOP SACS Pump AP201.
ENSURE SACS cooling is aligned to the A RHR Heat Exchanger AND secured to the B RHR Heat Exchanger.
There are no additional operators available to assist in the swap.
Page 2of11
 
JPM NUMBER: ~~~~~~~~~-
EG002                             NAME:
REV NUMBER:               13                               DATE:
STANDARD                    COMMENTS STEP                                                                         SAT/
ELEMENT                           (*Critical Step)             (Required for NUMBER                                                                        UNSAT
(#Sequential Step)               UNSAT)@
CUE: PROVIDE thia operator the initiating cue AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.
START TIME:
Operator obtains procedure         Operator obtains the correct HC.OP-AB.ZZ-0001                   procedure.
Attachment 10, Page 2 of 2, T ACS TRANSFER TO B LOOP.
Operator determines beginning     Operator enters the Date and step of the procedure.             Time, and determines correct beginning step to be 1.0.
1.0 IF 'A' Loop TAGS is isolating,     Operator determines this step is THEN LOCKOUT:                     not applicable and marks the Steps N/A.
* HV-2522 I 2496A
* HV-2522 I 2496A
* HV-2522 I 2496C 2.0 VERIFY no Line Break in the Operator reviews Initiating Cue T ACS System. and/or observes normal SACS Head Tank Levels, and determines no line break exists, and initials Step 3.0 ENSURE B and D SACS Pumps in service, lE required, THEN START the B(D) Pump as follows: Operator observes the SAFETY A. ENSURE REMOTE PB is AUXILIARIES COOLING LOOP B OFF. PUMPS PUMP D REMOTE light is extinguished, and initials Step. B. PLACE the B(D) Pump in *#operator presses the SAFETY MAN. AUXILIARIES COOLING LOOP B PUMPS PUMP D MAN pushbutton, observes the MAN light illuminates and the AUTO light extinguishes, and initials Step. Page 3of11 JPM NUMBER: EG002 NAME:
* HV-2522 I 2496C 2.0 VERIFY no Line Break in the       Operator reviews Initiating Cue T ACS System.                     and/or observes normal SACS Head Tank Levels, and determines no line break exists, and initials Step 3.0 ENSURE B and D SACS Pumps in service, lE required, THEN START the B(D) Pump as follows:                       Operator observes the SAFETY A. ENSURE REMOTE PB is           AUXILIARIES COOLING LOOP B OFF.                         PUMPS PUMP D REMOTE light is extinguished, and initials Step.
REV NUMBER: 13 DATE: STEP STANDARD SAT/ COMMENTS ELEMENT (*Critical Step) (Required for NUMBER (#Sequential Step) UNSAT UNSAT)@ C. START the B(D) SACS *#Operator presses the SAFETY Pump. AUXILIARIES COOLING LOOP B I PUMPS PUMP D DP210 START Date/Time pushbutton, observes the PUMP D DP210 START light illuminates and the STOP light extinguishes, enters the Date and Time, and initials Step. CUE: IF asked for status of 'D' SACS pump after the start, REPORT post start checks are satisfactory.
B. PLACE the B(D) Pump in         *#operator presses the SAFETY MAN.                         AUXILIARIES COOLING LOOP B PUMPS PUMP D MAN pushbutton, observes the MAN light illuminates and the AUTO light extinguishes, and initials Step.
D. OBSERVE LOW DIFF Operator observes the SAFETY PRESS light extinguishes.
Page 3of11
AUXILIARIES COOLING LOOP B PUMPS PUMP D LOW DIFF PRESS light is not illuminated, and initials Step. 4.0 ENSURE the following valves *#operator presses the LOOP B are OPEN/OPENING:
 
ISLN TACS CLG/HYDR PNEU
JPM NUMBER:           EG002                           NAME:   ~~~~~~~~~~~~~~~~
* HV-2522/24968 ACCUM AIR TACS INBD SPLY/RTN HV 2522B HV 2496B OPEN pushbutton, observes the HV 25228 HV 24968 OPEN light illuminates, and the CLOSE light extinguishes, and initials Step.
REV NUMBER:               13                           DATE:
* HV-2522/2496D  
STANDARD                          COMMENTS STEP                                                                       SAT/
*#operator presses the LOOP B ISLN TACS CLG/HYDR PNEU ACCUM AIR TACS OUTBD SPL Y/RTN HV-25220/HV-24960 OPEN pushbutton, observes the HV 2522D HV 2496D OPEN light illuminates, and the CLOSE light extinguishes, and initials Step. 5.0 WHEN a positive indication is *#operator presses the LOOP A observed that valves in Step ISLN TACS CLG/HYDR PNEU 4.0 are OPEN/OPENING, ACCUM AIR TACS INBD THEN ENSURE the following SPL Y/RTN CLOSE pushbutton valves are CLOSED/CLOSING:
ELEMENT                         (*Critical Step)                   (Required for NUMBER                                                                     UNSAT
for HV 2522 HV 2496A,
(#Sequential Step)                     UNSAT)@
* HV-2522 I 2496A observes the CLOSE lights illuminate and the HV 2522A HV 2496A OPEN light extinguishes, and initials Step. Page 4of11 JPM NUMBER: EG002 NAME:
C. START the B(D) SACS         *#Operator presses the SAFETY Pump.                       AUXILIARIES COOLING LOOP B I               PUMPS PUMP D DP210 START Date/Time           pushbutton, observes the PUMP D DP210 START light illuminates and the STOP light extinguishes, enters the Date and Time, and initials Step.
REV NUMBER: 13 DATE: STEP STANDARD SAT/ COMMENTS NUMBER ELEMENT (*Critical Step) UNSAT (Required for (#Sequential Step) UNSAT)(a)
CUE: IF asked for status of 'D' SACS pump after the start, REPORT post start checks are satisfactory.
* HV-2522 I 2496C *#Operator presses the LOOP A ISLN TACS CLG/HYDR PNEU ACCUM AIR TACS OUTBD SPL Y/RTN CLOSE pushbutton for HV 2522 HV 2496C, observes the CLOSE lights illuminate and the HV 2522C HV 2496C OPEN light extinguishes, and initials Step. 6.0 ENSURE the B AND D SACS Operator observes the SAFETY Pumps are in AUTO. AUXILIARIES COOLING LOOP B PUMPS PUMP B AUTO light is illuminated and MAN light is extinguished, *#operator presses the SAFETY AUXILIARIES COOLING LOOP B PUMPS PUMP D AUTO pushbutton, I observes the AUTO light illuminates and the MAN light extinguishes, and initials Step. 7.0 PERFORM the following lE required:  
D. OBSERVE LOW DIFF             Operator observes the SAFETY PRESS light extinguishes. AUXILIARIES COOLING LOOP B PUMPS PUMP D LOW DIFF PRESS light is not illuminated, and initials Step.
*#operator presses the A. ADJUST OPEN HV-2512A HV2512A INCR pushbutton until to ==4500 gpm SACS flow flow on Fl-2511A (CRIDS, or to "A" RHR Hx. ,, equivalent) indicates  
4.0 ENSURE the following valves     *#operator presses the LOOP B are OPEN/OPENING:               ISLN TACS CLG/HYDR PNEU ACCUM AIR TACS INBD
==4500 gpm, and initials Step. B. CLOSE HV-25128 *#operator presses the HV2512B DECR pushbutton until the HV2512B OPEN light extinguishes and initials Step. CUE: DIRECT the operator to secure SACS Pump AP210. C. PLACE the A(C) SACS Operator presses the SAFETY Pump in MAN. AUXILIARIES COOLING LOOP A PUMPS PUMP A MAN pushbutton, and/or observes the MAN light illuminates and the AUTO light extinguishes(d), and initials Step. EXAMINER NOTE: The pump should have already swapped to MAN. Page 5of11 JPM NUMBER: EG002 REV NUMBER: 13 STEP STANDARD SAT/ COMMENTS ELEMENT (*Critical Step) (Required for NUMBER (#Sequential Step) UNSAT UNSAT)@ D. STOP the A(C) SACS *#operator presses the SAFETY Pump. AUXILIARIES COOLING LOOP A PUMPS PUMP A STOP pushbutton, observes the PUMP A STOP light illuminates and the AP210 START light extinguishes, and initials Step. 8.0 ENSURE proper Service Water Operator observes that a SSW pump alignment IAW HC.OP-pump is operating in each loop, SO.EA-0001 and initials Step. CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME. REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
* HV-2522/24968 SPLY/RTN HV 2522B HV 2496B OPEN pushbutton, observes the HV 25228 HV 24968 OPEN light illuminates, and the CLOSE light extinguishes, and initials Step.
STOP TIME: ' Task Standard:
* HV-2522/2496D               *#operator presses the LOOP B ISLN TACS CLG/HYDR PNEU ACCUM AIR TACS OUTBD SPLY/RTN HV-25220/HV-24960 OPEN pushbutton, observes the HV 2522D HV 2496D OPEN light illuminates, and the CLOSE light extinguishes, and initials Step.
Operator transfers TACS to SACS Loop Bin accordance with HC.OP-AB.ZZ-0001 Attachment  
5.0 WHEN a positive indication is   *#operator presses the LOOP A observed that valves in Step   ISLN TACS CLG/HYDR PNEU 4.0 are OPEN/OPENING,           ACCUM AIR TACS INBD THEN ENSURE the following       SPLY/RTN CLOSE pushbutton valves are CLOSED/CLOSING:     for HV 2522 HV 2496A,
: 10. @Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments.  
* HV-2522 I 2496A             observes the CLOSE lights illuminate and the HV 2522A HV 2496A OPEN light extinguishes, and initials Step.
[IER L 1-11-3 Rec. 3b] Page 6of11 JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Reactor Protection 2016 NRC EXAM JPM I Copy __ of __ TASK NUMBER: 2120050101 TASK: Transfer RPS Bus A/B Power From Alternate Source To RPS MG Set JPM NUMBER: 305H-JPM.SB015 REVISION:
Page 4of11
06 SAP BET: NOH05JPSB1 SE K/A NUMBER: 212000 A2. Ability to (a) predict the impacts of the following on the REACTOR PROTECTION SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR: 41.5 I 45.6) A2.01 RPS Motor-Generator Set Failure IMPORTANCE FACTOR: RO: 3.7 SRO: 3.9 ALTERNATE PATH: APPLICABILITY: EVALUATION SETTING/METHOD:
 
Plant/Simulate  
JPM NUMBER: ~~~~~~~~~
EG002                       NAME:   ~~~~~~~~~~~~~~~~-
REV NUMBER:             13                           DATE:
STANDARD                    COMMENTS STEP                                                                     SAT/
ELEMENT                       (*Critical Step)               (Required for NUMBER                                                                    UNSAT
(#Sequential Step)               UNSAT)(a)
* HV-2522 I 2496C           *#Operator presses the LOOP A ISLN TACS CLG/HYDR PNEU ACCUM AIR TACS OUTBD SPLY/RTN CLOSE pushbutton for HV 2522 HV 2496C, observes the CLOSE lights illuminate and the HV 2522C HV 2496C OPEN light extinguishes, and initials Step.
6.0 ENSURE the B AND D SACS       Operator observes the SAFETY Pumps are in AUTO.           AUXILIARIES COOLING LOOP B PUMPS PUMP B AUTO light is illuminated and MAN light is extinguished,
                                      *#operator presses the SAFETY AUXILIARIES COOLING LOOP B PUMPS PUMP D AUTO pushbutton,                                           I observes the AUTO light illuminates and the MAN light extinguishes, and initials Step.
7.0 PERFORM the following lE required:
                                      *#operator presses the A. ADJUST OPEN HV-2512A       HV2512A INCR pushbutton until to ==4500 gpm SACS flow   flow on Fl- 2511A (CRIDS, or                         ,,
to "A" RHR Hx.           equivalent) indicates ==4500 gpm, and initials Step.
B. CLOSE HV-25128             *#operator presses the HV2512B DECR pushbutton until the HV2512B OPEN light extinguishes and initials Step.
CUE: DIRECT the operator to secure SACS Pump AP210.
C. PLACE the A(C) SACS       Operator presses the SAFETY Pump in MAN.             AUXILIARIES COOLING LOOP A PUMPS PUMP A MAN pushbutton, and/or observes the MAN light illuminates and the AUTO light extinguishes(d), and initials Step.
EXAMINER NOTE: The pump should have already swapped to MAN.
Page 5of11
 
JPM NUMBER:   ~~~~~~~~~
EG002 REV NUMBER:                 13 STANDARD                            COMMENTS STEP                                                                             SAT/
ELEMENT                         (*Critical Step)                     (Required for NUMBER                                                                           UNSAT
(#Sequential Step)                       UNSAT)@
D. STOP the A(C) SACS           *#operator presses the SAFETY Pump.                       AUXILIARIES COOLING LOOP A PUMPS PUMP A STOP pushbutton, observes the PUMP A STOP light illuminates and the AP210 START light extinguishes, and initials Step.
8.0   ENSURE proper Service Water     Operator observes that a SSW pump alignment IAW HC.OP-       pump is operating in each loop, SO.EA-0001                       and initials Step.
CUE:   WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.
REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
STOP TIME:
Task Standard: Operator transfers TACS to SACS Loop Bin accordance with HC.OP-AB.ZZ-0001 Attachment 10.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L1-11-3 Rec. 3b]
Page 6of11
 
JOB PERFORMANCE MEASURE STATION: Hope Creek                         2016 NRC EXAM                            Copy _ _ of _ _
SYSTEM:   Reactor Protection JPM I TASK NUMBER:     2120050101 TASK: Transfer RPS Bus A/B Power From Alternate Source To RPS MG Set JPM NUMBER: 305H-JPM.SB015                                                   REVISION: 06 SAP BET:   NOH05JPSB1 SE K/A NUMBER:   212000 A2. Ability to (a) predict the impacts of the following on the REACTOR PROTECTION SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:
(CFR: 41.5 I 45.6)
A2.01 RPS Motor-Generator Set Failure IMPORTANCE FACTOR:             RO: 3.7     SRO: 3.9 ALTERNATE PATH:   ~
APPLICABILITY:                     RO~                                    SRO~
EVALUATION SETTING/METHOD:         Plant/Simulate


==REFERENCES:==
==REFERENCES:==
HC.OP-SO.SB-0001, Rev 34 TOOLS, AND EQUIPMENT:      None ESTIMATED COMPLETION TIME:                12
                                                                                    ---    - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:                    N/A    Minutes JPM PERFORMED BY:                                                      GRADE: SAT    D      UNSAT D ACTUAL COMPLETION TIME: - - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME: - -N/A            - - - Minutes REASON IF UNSATISFACTORY:
EVALUATOR:                                                              DATE:
Signature Page 1of10
JOB PERFORMANCE MEASURE SYSTEM:    Reactor Protection TASK NUMBER:      2120050101 TASK:    Transfer RPS Bus A/B Power From Alternate Source To RPS MG Set INITIAL CONDllTONS:
: 1. The plant is at 100% power.
: 2. RPS A is being powered from the ALTERNATE A FEED.
: 3. Maintenance has been completed on 1A-G-401, RPS MG set.
: 4. Once the MG Set is running, Maintenance needs to check/adjust MG Set output voltage in accordance with Step 5.5.2.D.
INITIATING CUE:
START the 1A-G-401, RPS MG SET A, in preparation to transfer RPS Bus A power from RPS Alternate Transformer A to RPS MG SET A in accordance with Section 5.5 of HG.OP SO.SB 0001.
CONTACT Maintenance when ready for MG set output voltage check/adjust.
Page 2of10
JPM NUMBER:              SB015                          NAME:    ~~~~~~~~~~~~~~~~~
REV NUMBER:                06                            DATE:
(*Critical Step)                      COMMENTS STEP                                                                        SAT/
ELEMENT                        (#Sequential Step)                      (Required for NUMBER                                                                        UNSAT STANDARD                              UNSAT)@
CUE:  PROVIDE the operator the initiating cue AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.
START TIME:
Operator obtains procedure        Operator obtains the correct HC.OP-SO.SB-0001.                procedure.
Operator reviews precautions      Operator reviews precautions and and limitations.                  limitations.
CUE:  If excessive time is taken reviewing precautions and limitations, inform operator that all are satisfied.
Operator determines beginning    Operator determines correct step of the procedure.            beginning step to be 5.5.1 5.5.1 ENSURE all prerequisites of      Operator ensures that all Section 2.5 are satisfied.        prerequisites have been satisfied.
CUE:  If excessive time is taken reviewing prerequisites, inform operator that all are satisfied.
CUE:  IF asked about the current status/indications, state: The Red MOTOR ON lamp is extinguished, and the Green MOTOR OFF lamp is illuminated. The output breaker is open.
5.5.2 lE start of 1A(B)G401, RPS  MG    Operator determines that this Step Set, is necessary, THEN          applies and initials Step.
PERFORM the following (A[B]
MG Set Local Panel):
NOTE  IF the MOTOR ON push-button      Operator reads and initials NOTE.
is NOT held in for long enough, THEN the starting sequence will NOT be completed. This may result in an undervoltage condition in the generator, which may result in generator damage.
A. PRESS AND HOLD the            *#operator presses and holds MOTOR ON push-button          the AG401 MOTOR ON push-(Red MOTOR ON lamp            button, illuminates).
and initials Step.
CUE:  The Red MOTOR ON lamp is illuminated, and the Green MOTOR OFF lamp is extinguished.
Page 3of10


HC.OP-SO.SB-0001, Rev 34 TOOLS, AND EQUIPMENT:
JPM NUMBER:   ~~~~~~~~~-
None ESTIMATED COMPLETION TIME: 12 Minutes -----TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: Minutes -----ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes -----REASON IF UNSATISFACTORY:
SB015                         NAME:   ~~~~~~~~~~~~~~~~-
EVALUATOR:
REV NUMBER:                 06                           DATE:
DATE: Signature Page 1of10 JOB PERFORMANCE MEASURE SYSTEM: Reactor Protection TASK NUMBER: 2120050101 TASK: Transfer RPS Bus A/B Power From Alternate Source To RPS MG Set INITIAL CONDllTONS:
(*Critical Step)                     COMMENTS STEP                                                                          SAT/
: 1. The plant is at 100% power. 2. RPS A is being powered from the ALTERNATE A FEED. 3. Maintenance has been completed on 1A-G-401, RPS MG set. 4. Once the MG Set is running, Maintenance needs to check/adjust MG Set output voltage in accordance with Step 5.5.2.D. INITIATING CUE: START the 1 A-G-401, RPS MG SET A, in preparation to transfer RPS Bus A power from RPS Alternate Transformer A to RPS MG SET A in accordance with Section 5.5 of HG.OP SO.SB 0001. CONT ACT Maintenance when ready for MG set output voltage check/adjust.
ELEMENT                       (#Sequential Step)                     (Required for NUMBER                                                                         UNSAT STANDARD                           UNSAT)@
Page 2of10 JPM NUMBER: SB015 NAME:
B. VERIFY A-C VOL TS               Operator observes A-C VOL TS Generator Output Voltage       Generator Output Voltage and AND PERFORM the               EXPECTS a voltage increase to following:                     115-125 volts which stabilizes for approximately 5 seconds.
REV NUMBER: 06 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ CUE: PROVIDE the operator the initiating cue AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue. START TIME: Operator obtains procedure Operator obtains the correct HC.OP-SO.SB-0001.
: 1. IF voltage increases to 115 - 125 volts AND has   Following the next Cue, the been stabilized for       Operator determines need to approximately 5 seconds,   proceed to Step 5.5.2.B.2.
procedure.
Operator reviews precautions Operator reviews precautions and and limitations.
limitations.
CUE: If excessive time is taken reviewing precautions and limitations, inform operator that all are satisfied.
Operator determines beginning Operator determines correct step of the procedure.
beginning step to be 5.5.1 5.5.1 ENSURE all prerequisites of Operator ensures that all Section 2.5 are satisfied.
prerequisites have been satisfied.
' CUE: If excessive time is taken reviewing prerequisites, inform operator that all are satisfied.
CUE: IF asked about the current status/indications, state: The Red MOTOR ON lamp is extinguished, and the Green MOTOR OFF lamp is illuminated.
The output breaker is open. 5.5.2 lE start of 1A(B)G401, RPS MG Operator determines that this Step Set, is necessary, THEN applies and initials Step. PERFORM the following (A[B] MG Set Local Panel): NOTE IF the MOTOR ON push-button Operator reads and initials NOTE. is NOT held in for long enough, THEN the starting sequence will NOT be completed.
This may result in an undervoltage condition in the generator, which may result in generator damage. A. PRESS AND HOLD the *#operator presses and holds MOTOR ON push-button the AG401 MOTOR ON push-(Red MOTOR ON lamp button, illuminates).
and initials Step. CUE: The Red MOTOR ON lamp is illuminated, and the Green MOTOR OFF lamp is extinguished.
Page 3of10 JPM NUMBER: SB015 NAME:
REV NUMBER: 06 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ B. VERIFY A-C VOL TS Operator observes A-C VOL TS Generator Output Voltage Generator Output Voltage and AND PERFORM the EXPECTS a voltage increase to following:
115-125 volts which stabilizes for 1. IF voltage increases to approximately 5 seconds. 115 -125 volts AND has Following the next Cue, the been stabilized for Operator determines need to approximately 5 seconds, proceed to Step 5.5.2.B.2.
THEN RELEASE the MOTOR ON push-button.
THEN RELEASE the MOTOR ON push-button.
CUE: The meter identified has risen from 0 volts, and has stabilized at approximately 100 volts. 2. IF voltage does NOT increase to 115 -125 volts, THEN PERFORM *#Operator releases the AG401 the following:
CUE: The meter identified has risen from 0 volts, and has stabilized at approximately 100 volts.
MOTOR ON push-button, a. RELEASE the and initials Step. MOTOR ON push-button. ' b. PRESS AND HOLD *#Operator presses and holds MOTOR OFF push-the AG401 MOTOR OFF push-button. button, and initials Step. c. WHEN the MOTOR When the AG401 MOTOR ON light ON light extinguishes, extinguishes, the operator releases THEN RELEASE the the AG401 MOTOR OFF push-MOTOR OFF push-button. button. Following the next Cue, the *operator releases the MOTOR OFF push-button, and initials Step. CUE: The Red MOTOR ON lamp is extinguished, and the Green MOTOR OFF lamp is illuminated.  
: 2. IF voltage does NOT increase to 115 - 125 volts, THEN PERFORM       *#Operator releases the AG401 the following:             MOTOR ON push-button,
: d. REPEAT Step Operator returns to Step 5.5.2.A. 5.5.2.A. CUE: If asked about restarting the MG Set, inform the operator that one restart attempt is allowed and restart can be attempted while the MG Set is spinning.
: a. RELEASE the           and initials Step.
Page 4of10 JPM NUMBER: SB015 NAME:
MOTOR ON push-button.                                   '
REV NUMBER: 06 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ 5.5.2 A. PRESS AND HOLD the *#operator presses and holds MOTOR ON push-button the AG401 MOTOR ON push-(Red MOTOR ON lamp button, illuminates).
: b. PRESS AND HOLD         *#Operator presses and holds MOTOR OFF push-       the AG401 MOTOR OFF push-button.               button, and initials Step.
and initials Step. CUE: The Red MOTOR ON lamp is illuminated, and the Green MOTOR OFF lamp is extinguished.
: c. WHEN the MOTOR         When the AG401 MOTOR ON light ON light extinguishes, extinguishes, the operator releases THEN RELEASE the       the AG401 MOTOR OFF push-MOTOR OFF push-       button.
B. VERIFY A-C VOL TS Operator observes A-C VOL TS Generator Output Voltage Generator Output Voltage and AND PERFORM the EXPECTS a voltage increase to following:
button.
115-125 volts which stabilizes for 1. !E voltage increases to approximately 5 seconds. 115 -125 volts AND has Following the next Cue, the been stabilized for approximately 5 seconds, *#Operator releases the AG401 THEN RELEASE the MOTOR ON push-button, MOTOR ON push-button.
Following the next Cue, the
and initials Step. CUE: The meter identified has risen from 0 volts, and has stabilized at approximately 120 volts for I approximately 5 seconds. 2. !E voltage does NOT Operator determines this step no increase to 115 -125 longer applies. volts, THEN PERFORM the following:
                                          *operator releases the MOTOR OFF push-button, and initials Step.
C. WHEN 1 minute of MG Set Operator waits one minute, and operation has elapsed, *#places the RPS MG Set THEN PLACE RPS MG Set 1A(B)G401 GENERATOR 1AG401 GENERATOR OUTPUT OUTPUT breaker to ON breaker to ON, AND INITIAL Attachment  
CUE: The Red MOTOR ON lamp is extinguished, and the Green MOTOR OFF lamp is illuminated.
: 1. initials Attachment 1, and initials the Step. CUE: The breaker identified is in the stated position.
: d. REPEAT Step           Operator returns to Step 5.5.2.A.
NOTE The RPS MG Set output voltage shall NOT be set using the local panel meter. Use of the local panel meter ... Page 5of10 JPM NUMBER: SB015 NAME:
5.5.2.A.
REV NUMBER: 06 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ D. REQUEST Maintenance Operator requests maintenance to Department to CHECK AND check and adjust if necessary RPS ADJUST (as necessary), the MG Set A output voltage at the RPS MG Set(s) output input to Electrical Protection voltage at the input to Assembly (EPA) Circuit Breaker Electrical Protection 1AN410 (unloaded)
CUE: If asked about restarting the MG Set, inform the operator that one restart attempt is allowed and restart can be attempted while the MG Set is spinning.
IAW HG.MD-Assembly (EPA) Circuit PM.SB-0001 (Q). Breaker 1 AN410 ( 1 AN411) (unloaded)
Page 4of10
IAW HG.MD-PM.SB-0001 (Q), OTHERWISE, VERIFY A-C VOL TS at local panel meter is 115 to 125 volts. CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME. REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
 
STOP TIME: Task Standard:
JPM NUMBER:   ~~~~~~~~~-
Operator starts the 1 A-G-401, RPS MG SET A, in accordance with Section 5.5 of HG.OP SO.SB-0001. @Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments.  
SB015                           NAME:   ~~~~~~~~~~~~~~~~-
[IER L 1-11-3 Rec. 3b] Page 6of10 JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Control Rod Drive Hydraulic TASK NUMBER: 2010090104 TASK: Shift In-Service CRD Stabilizing Valves JPM NUMBER: 305H-JPM.BF002 SAP BET: NOH05JPBF02E 2016 NRC EXAM JPM J Copy __ of __ REVISION:
REV NUMBER:                 06                           DATE:
12 K/A NUMBER: 201001 A2. Ability to (a) predict the impacts of the following on the CONTROL ROD DRIVE HYDRAULIC SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR: 41.5 I 45.6) ALTERNATE PATH: D APPLICABILITY:
(*Critical Step)                   COMMENTS STEP                                                                        SAT/
A2.02 Valve closures RO l:8J IMPORTANCE FACTOR: RO: 3.2 SRO: 3.3 SRO l:8J EVALUATION SETTING/METHOD:
ELEMENT                       (#Sequential Step)                   (Required for NUMBER                                                                        UNSAT STANDARD                           UNSAT)@
Reactor Building/Simulate  
5.5.2 A. PRESS AND HOLD the             *#operator presses and holds MOTOR ON push-button         the AG401 MOTOR ON push-(Red MOTOR ON lamp           button, illuminates).
and initials Step.
CUE: The Red MOTOR ON lamp is illuminated, and the Green MOTOR OFF lamp is extinguished.
B. VERIFY A-C VOL TS             Operator observes A-C VOLTS Generator Output Voltage     Generator Output Voltage and AND PERFORM the               EXPECTS a voltage increase to following:                   115-125 volts which stabilizes for approximately 5 seconds.
: 1.   !E voltage increases to 115 - 125 volts AND has   Following the next Cue, the been stabilized for approximately 5 seconds, *#Operator releases the AG401 THEN RELEASE the         MOTOR ON push-button, MOTOR ON push-button.
and initials Step.
I CUE: The meter identified has risen from 0 volts, and has stabilized at approximately 120 volts for approximately 5 seconds.
: 2.   !E voltage does NOT       Operator determines this step no increase to 115 - 125     longer applies.
volts, THEN PERFORM the following:
C. WHEN 1 minute of MG Set       Operator waits one minute, and operation has elapsed, THEN PLACE RPS MG Set        *#places the RPS MG Set 1A(B)G401 GENERATOR           1AG401 GENERATOR OUTPUT OUTPUT breaker to ON         breaker to ON, AND INITIAL Attachment 1.
initials Attachment 1, and initials the Step.
CUE: The breaker identified is in the stated position.
NOTE The RPS MG Set output voltage shall NOT be set using the local panel meter. Use of the local panel meter ...
Page 5of10
 
JPM NUMBER:   ~~~~~~~~~
SB015                           NAME:   ~~~~~~~~~~~~~~~~
REV NUMBER:                 06                             DATE:
(*Critical Step)                     COMMENTS STEP                                                                          SAT/
ELEMENT                       (#Sequential Step)                     (Required for NUMBER                                                                        UNSAT STANDARD                             UNSAT)@
D. REQUEST Maintenance           Operator requests maintenance to Department to CHECK AND       check and adjust if necessary RPS ADJUST (as necessary), the     MG Set A output voltage at the RPS MG Set(s) output           input to Electrical Protection voltage at the input to       Assembly (EPA) Circuit Breaker Electrical Protection         1AN410 (unloaded) IAW HG.MD-Assembly (EPA) Circuit         PM.SB-0001 (Q).
Breaker 1AN410 ( 1AN411)
(unloaded) IAW HG.MD-PM.SB-0001 (Q),
OTHERWISE, VERIFY A-C VOL TS at local panel meter is 115 to 125 volts.
CUE:   WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.
REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
STOP TIME:
Task Standard: Operator starts the 1A-G-401, RPS MG SET A, in accordance with Section 5.5 of HG.OP SO.SB-0001.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]
Page 6of10
 
JOB PERFORMANCE MEASURE STATION: Hope Creek                             2016 NRC EXAM                        Copy _ _ of _ _
JPM J SYSTEM:   Control Rod Drive Hydraulic TASK NUMBER:     2010090104 TASK: Shift In-Service CRD Stabilizing Valves JPM NUMBER: 305H-JPM.BF002                                                   REVISION: 12 SAP BET:   NOH05JPBF02E K/A NUMBER:     201001 A2. Ability to (a) predict the impacts of the following on the CONTROL ROD DRIVE HYDRAULIC SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR: 41.5 I 45.6)
A2.02 Valve closures IMPORTANCE FACTOR:           RO: 3.2     SRO: 3.3 ALTERNATE PATH:    D APPLICABILITY:                      RO  l:8J                              SRO l:8J EVALUATION SETTING/METHOD:           Reactor Building/Simulate


==REFERENCES:==
==REFERENCES:==
HC.OP-SO.BF-0001 Rev. 34 TOOLS, AND EQUIPMENT:        None ESTIMATED COMPLETION TIME: - - -        10 - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: - -N/A            - - - Minutes JPM PERFORMED BY:                                                      GRADE: SAT    D    UNSAT  D ACTUAL COMPLETION TIME: - - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME:                  N/A      Minutes REASON IF UNSATISFACTORY:
EVALUATOR:                                                              DATE:
Signature Page 1of9


HC.OP-SO.BF-0001 Rev. 34 TOOLS, AND EQUIPMENT:
JOB PERFORMANCE MEASURE SYSTEM:     Control Rod Drive Hydraulic TASK NUMBER:       2010090104 TASK:   Shift In-Service CRD Stabilizing Valves INITIAL CONDllTONS:
None ESTIMATED COMPLETION TIME: 10 Minutes -----TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes -----JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: Minutes -----ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON IF UNSATISFACTORY:
: 1. The plant is operating at 80% power.
EVALUATOR:
: 2. Stabilizing Valves A(B) is in service.
DATE: Signature Page 1of9 JOB PERFORMANCE MEASURE SYSTEM: Control Rod Drive Hydraulic TASK NUMBER: 2010090104 TASK: Shift In-Service CRD Stabilizing Valves INITIAL CONDllTONS:  
: 3. Stabilizing Valves A(B) has failed closed due to a malfunction in the Reactor Manual Control System.
: 1. The plant is operating at 80% power. 2. Stabilizing Valves A(B) is in service. 3. Stabilizing Valves A(B) has failed closed due to a malfunction in the Reactor Manual Control System. INITIATING CUE: PLACE Stabilizing Valves B(A) in service; SECURE Stabilizing Valves A(B) in accordance with SO.BF-0001, Section 5.2. * [Evaluator:
INITIATING CUE:
DETERMINE the in service and standbys Stabilizing Valves based on current plant conditions, AND MODIFY the Initial Conditions and STANDARDS appropriately.]
PLACE Stabilizing Valves B(A) in service; SECURE Stabilizing Valves A(B) in accordance with HC.OP-SO.BF-0001, Section 5.2. *
Page 2of9 JPM NUMBER: BF002 NAME:
[Evaluator: DETERMINE the in service and standbys Stabilizing Valves based on current plant conditions, AND MODIFY the Initial Conditions and STANDARDS appropriately.]
REV NUMBER: 12 DATE: STEP STANDARD SAT/ COMMENTS NUMBER ELEMENT (*Critical Step) UNSAT (Required for (#Sequential Step) UNSAT)@ CUE: PROVIDE the operator the initiating cue, a marked up copy of HC.OP-SO.BF-0001, AND ENTER START TIME AFTER Operator repeats back the Initiating Cue. START TIME: Operator reviews precautions Operator reviews precautions and and limitations.
Page 2of9
limitations.
 
CUE: IF excessive time is taken reviewing precautions and limitations, THEN INFORM operator that all are satisfied.
JPM NUMBER: ~~~~~~~~~-
Operator determines beginning Operator determines correct step of the procedure.
BF002                           NAME:   ~~~~~~~~~~~~~~~~~
beginning step to be 5.2.1. 5.2.1 ENSURE all prerequisites of Operator ensures all prerequisites Section 2.2 are satisfied.
REV NUMBER:               12                             DATE:
are satisfied; completes Attachment 1 and initials each prerequisite.  
STANDARD                          COMMENTS STEP                                                                         SAT/
' 5.2.5 lE Stabilizing Valve B(A) is to *operator simulates rotating the be alternated, THEN 1-BF-V054(1-BF-V071)
ELEMENT                         (*Critical Step)                   (Required for NUMBER                                                                        UNSAT
PERFORM the following:
(#Sequential Step)                     UNSAT)@
handwheel in the A. Slowly OPEN 1-BF-counterclockwise direction until V054(1-BF-V071  
CUE: PROVIDE the operator the initiating cue, a marked up copy of HC.OP-SO.BF-0001, AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.
), CRD the handwheel reaches full open, Drive Wtr Stabilizing Vlvs and initials Step. "B(A)" Inlet Viv. CUE: The handwheel of the valve indicated rotates in the direction indicated and comes to a hard stop. B. Slowly OPEN 1-BF-*operator simulates rotating the V060(1-BF-V059), CRD 1-BF-V060(1-BF-V059)
START TIME:
Drive Wtr Stabilizing Vlvs handwheel in the "B(A)" Outlet Viv. counterclockwise direction until the handwheel reaches full open, and initials Step. CUE: The handwheel of the valve indicated rotates in the direction indicated and comes to a hard stop. C. PRESS (STABILIZER Operator requests that the Control VALVES) VALVE Room press the VAL VE SELECTOR AND VERIFY SELECTOR push button and verify that B(A) VAL VE B(A) VAL VE SELECTED is SELECTED is illuminated.
Operator reviews precautions     Operator reviews precautions and and limitations.                 limitations.
illuminated.  
CUE: IF excessive time is taken reviewing precautions and limitations, THEN INFORM operator that all are satisfied.
Operator determines beginning     Operator determines correct step of the procedure.           beginning step to be 5.2.1.
5.2.1 ENSURE all prerequisites of       Operator ensures all prerequisites Section 2.2 are satisfied.       are satisfied; completes Attachment 1 and initials each prerequisite.
5.2.5 lE Stabilizing Valve B(A) is to   *operator simulates rotating the be alternated, THEN               1-BF-V054(1-BF-V071)
PERFORM the following:           handwheel in the A. Slowly OPEN 1-BF-             counterclockwise direction until V054(1-BF-V071 ), CRD         the handwheel reaches full open, Drive Wtr Stabilizing Vlvs   and initials Step.
            "B(A)" Inlet Viv.
CUE: The handwheel of the valve indicated rotates in the direction indicated and comes to a hard stop.
B. Slowly OPEN 1-BF-             *operator simulates rotating the V060(1-BF-V059), CRD         1-BF-V060(1-BF-V059)
Drive Wtr Stabilizing Vlvs   handwheel in the "B(A)" Outlet Viv.           counterclockwise direction until the handwheel reaches full open, and initials Step.
CUE: The handwheel of the valve indicated rotates in the direction indicated and comes to a hard stop.
C. PRESS (STABILIZER             Operator requests that the Control VALVES) VALVE                 Room press the VAL VE SELECTOR AND VERIFY           SELECTOR push button and verify that B(A) VAL VE             B(A) VAL VE SELECTED is SELECTED is illuminated.     illuminated.
(10C651C)
(10C651C)
CUE: Respond as the Control Room, B(A) Valve Selected is illuminated.
CUE: Respond as the Control Room, B(A) Valve Selected is illuminated.
Page 3 of 9 JPM NUMBER: BF002 NAME: REV NUMBER: 12 DATE: STEP STANDARD SAT/ COMMENTS NUMBER ELEMENT (*Critical Step) UNSAT (Required for (#Sequential Step) UNSAT)(@, D. CLOSE 1-BF-V059(1-BF-
Page 3 of 9
*#operator simulates rotating V060},CRD Drive Wtr the 1-BF-V059(1-BF-V060)
 
Stabilizing Vlvs "A(B)" handwheel in the clockwise Outlet Viv. direction until valve handwheel reaches a hard stop, and initials Step. CUE: The handwheel of the valve indicated rotates in the direction indicated and comes to a hard stop. E. CLOSE 1-BF-V071 (1-BF-*#operator simulates rotating V054 ), CRD Drive Wtr the 1-BF-V071(1-BF-V054)
JPM NUMBER:               BF002                           NAME:
Stabilizing Vlvs "A(B)" Inlet handwheel in the clockwise Viv. direction until valve handwheel reaches a hard stop, and initials Step. CUE: The handwheel of the valve indicated rotates in the direction indicated and comes to a hard stop. F.' OBSERVE that Operator observes approximately 6 approximately 6 gpm total gpm total flow through both the flow through both the Insert Insert AND Withdraw Stabilizing AND Withdraw Stabilizing valves is indicated on 1 BF-Fl-R004 valves is indicated on 1 BF-C11, Stabilizing Header Flow Fl-R004 C11, Stabilizing Indicator, and initials Step. Header Flow Indicator.
REV NUMBER:                 12                             DATE:
CUE: The meter indicates as seen. ' G. PERFORM valve lineup Operator completes valve lineup in IAW Attachment  
STANDARD                              COMMENTS STEP                                                                           SAT/
: 1. accordance with Attachment 1 and requests verification.
ELEMENT                         (*Critical Step)                       (Required for NUMBER                                                                          UNSAT
CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME. REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
(#Sequential Step)                         UNSAT)(@,
STOP TIME: Task Standard:
D. CLOSE 1-BF-V059(1-BF-         *#operator simulates rotating V060},CRD Drive Wtr           the 1-BF-V059(1-BF-V060)
Operator alternates CRD Hydraulic System Stabilizing Valves in accordance with HC.OP-SO.BF-0001. @Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments.  
Stabilizing Vlvs "A(B)"       handwheel in the clockwise Outlet Viv.                   direction until valve handwheel reaches a hard stop, and initials Step.
[IER L 1-11-3 Rec. 3b] Page 4 of 9 JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: 120 VAC Electrical Distribution TASK NUMBER: 4000020404 TASK: Respond To A Station Blackout 2016 NRC EXAM JPM K Copy __ of __ JPM NUMBER: 305H-JPM.PN005 REVISION:
CUE:   The handwheel of the valve indicated rotates in the direction indicated and comes to a hard stop.
00 SAP BET: NOH05JPPN05E K/A NUMBER: 295003AA1.
E. CLOSE 1-BF-V071 (1-BF-       *#operator simulates rotating V054 ), CRD Drive Wtr         the 1-BF-V071(1-BF-V054)
Ability to operate and/or monitor the following as they apply to PARTIAL OR COMPLETE LOSS OF A.C. POWER :(CFR: 41.7 I 45.6) AA 1.01 A.C. Electrical Distribution System IMPORTANCE FACTOR: RO: 3.7 SRO: 3.8 ALTERNATE PATH: D APPLICABILITY:
Stabilizing Vlvs "A(B)" Inlet handwheel in the clockwise Viv.                         direction until valve handwheel reaches a hard stop, and initials Step.
EVALUATION SETTING/METHOD:
CUE:   The handwheel of the valve indicated rotates in the direction indicated and comes to a hard stop.
Auxiliary Building/Simulate  
F.' OBSERVE that                 Operator observes approximately 6 approximately 6 gpm total     gpm total flow through both the flow through both the Insert Insert AND Withdraw Stabilizing AND Withdraw Stabilizing     valves is indicated on 1BF-Fl-R004 valves is indicated on 1BF-   C11, Stabilizing Header Flow Fl-R004 C11, Stabilizing     Indicator, and initials Step.
Header Flow Indicator.
CUE:   The meter indicates as seen.
G. PERFORM valve lineup           Operator completes valve lineup in IAW Attachment 1.           accordance with Attachment 1 and requests verification.
CUE:   WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.
REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
STOP TIME:
Task Standard: Operator alternates CRD Hydraulic System Stabilizing Valves in accordance with HC.OP-SO.BF-0001.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]
Page 4 of 9
 
JOB PERFORMANCE MEASURE STATION: Hope Creek                               2016 NRC EXAM                    Copy _ _ of _ _
JPM K SYSTEM:   120 VAC Electrical Distribution TASK NUMBER:   4000020404 TASK: Respond To A Station Blackout JPM NUMBER: 305H-JPM.PN005                                               REVISION: 00 SAP BET:   NOH05JPPN05E K/A NUMBER:   295003AA1. Ability to operate and/or monitor the following as they apply to PARTIAL OR COMPLETE LOSS OF A.C. POWER :(CFR: 41.7 I 45.6)
AA 1.01 A.C. Electrical Distribution System IMPORTANCE FACTOR:           RO: 3.7     SRO: 3.8 ALTERNATE PATH:   D APPLICABILITY:                                                         SRO  (8J EVALUATION SETTING/METHOD: Auxiliary Building/Simulate


==REFERENCES:==
==REFERENCES:==
HC.OP-AB.ZZ-0135 Rev. 41 TOOLS, AND EQUIPMENT:      HC.OP-AB.ZZ-0135 Equipment stored in the EOP locker in the shift clerks office in the Main Control Room ESTIMATED COMPLETION TIME:          - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:
                                                                                - - Minutes JPM PERFORMED BY:                                                  GRADE: SAT    D      UNSAT  D ACTUAL COMPLETION TIME:                      Minutes ACTUAL TIME CRITICAL COMPLETION TIME:                        Minutes REASON IF UNSATISFACTORY:
EVALUATOR:                                                            DATE:
Signature Page 1of11


HC.OP-AB.ZZ-0135 Rev. 41 SRO (8J TOOLS, AND EQUIPMENT:
JOB PERFORMANCE MEASURE SYSTEM:     120 VAC Electrical Distribution TASK NUMBER:       4000020404 TASK:   Respond To A Station Blackout INITIAL CONDllTONS:
HC.OP-AB.ZZ-0135 Equipment stored in the EOP locker in the shift clerks office in the Main Control Room ESTIMATED COMPLETION TIME: 15 Minutes ----TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: 30 Minutes ----JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: Minutes REASON IF UNSATISFACTORY:
: 1. The plant is in OPCON 3.
EVALUATOR:
: 2. A loss of all offsite and onsite AC power has occurred.
DATE: Signature Page 1of11 JOB PERFORMANCE MEASURE SYSTEM: 120 VAC Electrical Distribution TASK NUMBER: 4000020404 TASK: Respond To A Station Blackout INITIAL CONDllTONS:  
: 1. The plant is in OPCON 3. 2. A loss of all offsite and onsite AC power has occurred.  
: 3. HC.OP-AB.ZZ-0135, STATION BLACKOUT //LOSS OF OFFSITE POWER//DIESEL GENERATOR MALFUNCTION is being implemented.
: 3. HC.OP-AB.ZZ-0135, STATION BLACKOUT //LOSS OF OFFSITE POWER//DIESEL GENERATOR MALFUNCTION is being implemented.
INITIATING CUE: PERFORM the 30 MINUTE SBO Actions of HC.OP-AB.ZZ-0135, Attachment 1 OA, Auxiliary Building Actions For SBO -Operator #1. This is a Time Critical JPM. Page 2of11 JPM NUMBER: PN005 NAME:
INITIATING CUE:
REV NUMBER: 00 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ CUE: PROVIDE the operator the initiating cue AND ENTER START TIME AFTER Operator repeats back the Initiating Cue. START TIME: Operator obtains and locates Operator obtains HG.OP AB.ZZ-procedure.
PERFORM the 30 MINUTE SBO Actions of HC.OP-AB.ZZ-0135, Attachment 1OA, Auxiliary Building Actions For SBO - Operator #1.
0135. Operator determines beginning Operator obtains copy of step of the procedure.
This is a Time Critical JPM.
Attachment 1 OA. ATTACHMENT 10A, AUXILIARY BUILDING ACTIONS FOR SBO-OPERATOR #1 EQUIPMENT REQUIRED:  
Page 2of11
*#operator obtains equipment (Equipment below is stored in required by Attachment 10A, the EOP locker in the shift (stored in the EOP locker in the clerk's office) shift clerks office) 7 Door Stops and initials Attachment 1 OA. 4 Keys, all #172 (PA 2235) in I Note: It is critical that the Work Control Key Cabinet equipment is obtained before the performance of the following actions. However, the following actions can be completed in any order. CUE: After the operator has obtained the equipment, inform the operator to return equipment to storage, and to assume that the Equipment Required has been obtained.  
 
: 1. BYPASS HPCI and RCIC high *operator inserts one #172 (PA temperature isolation trips at 2235) key into switch B21 B-S6A the following (Key 172, and rotates to the BYPASS PA2235, for all switches):
JPM NUMBER: ~~~~~~~~~-
position,
PN005                             NAME:     ~~~~~~~~~~~~~~~~-
* HPCI panel 1 O-C-620, Switch 821 B-S6A and initials Attachment 1 OA. CUE: The switch you have indicated is in the stated position.
REV NUMBER:               00                               DATE:
* HPCI panel 1 O-C-641, *operator inserts one #172 (PA Switch 821 B-S6C 2235) key into switch B21 B-S6C and rotates to the BYPASS position, and initials Attachment 1 OA. CUE: The switch you have indicated is in the stated position.
(*Critical Step)                   COMMENTS STEP                                                                      SAT/
Page 3of11 JPM NUMBER: PN005 NAME:
ELEMENT                       (#Sequential Step)                   (Required for NUMBER                                                                    UNSAT STANDARD                         UNSAT)@
REV NUMBER: 00 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@
CUE: PROVIDE the operator the initiating cue AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.
* RCIC panel 1 O-C-621, *operator inserts one #172 (PA Switch 821 B-S5B 2235) key into switch B21 B-S5B and rotates to the BYPASS position, and initials Attachment 1 OA. CUE: The switch you have indicated is in the stated position.
START TIME:
* RCIC panel 1 O-C-640, *operator inserts one #172 (PA Switch 821 B-S5D 2235) key into switch B21 B-S5D and rotates to the BYPASS position, and initials Attachment 1 OA. CUE: The switch you have indicated is in the stated position.  
Operator obtains and locates     Operator obtains HG.OP AB.ZZ-procedure.                       0135.
: 2. BLOCK OPEN the following doors in the Lower Relay Room. ' *operator opens and blocks 5335A,5302A,5302C,5316B, open door 5335A using a Door 5318C Stop, Note: The doors may be blocked open in any order. CUE: The door you have id.entified is blocked open. *operator opens and blocks open door 5302A using a Door Stop, CUE: The door you have identified is blocked open. *operator opens and blocks open door 5302C using a Door Stop, CUE: The door you have identified is blocked open. *operator opens and blocks open door 5316B using a Door Stop, CUE: The door you have identified is blocked open. Page 4of11 JPM NUMBER: PN005 NAME:
Operator determines beginning     Operator obtains copy of step of the procedure.           Attachment 1OA.
REV NUMBER: 00 DATE: STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ *operator opens and blocks open door 5318C using a Door Stop, and initials Attachment 1 OA. CUE: The door you have identified is blocked open. 3. OPEN the circuit breakers in Operator reads and initials Step the following tables to shed when complete.
ATTACHMENT 10A, AUXILIARY BUILDING ACTIONS FOR SBO- OPERATOR #1 EQUIPMENT REQUIRED:               *#operator obtains equipment (Equipment below is stored in     required by Attachment 10A, the EOP locker in the shift       (stored in the EOP locker in the clerk's office)                   shift clerks office) 7 Door Stops                     and initials Attachment 1OA.
non-essential loads. Note: All of the following actions are located in 54' CONTROL DIESEL, RM 5102A. I LOCATION PANEL# 54* *operator locates 1 BJ483, CONTROL 1BJ483 DIESEL and simulates opening circuit RM 5102A breaker #6, CIRCUIT#6 and initials block. FUSE PANEL 1YF406 I CUE: The breaker you have indicated is open. CIRCUIT#10  
4 Keys, all #172 (PA 2235) in     Note: It is critical that the I
*operator simulates opening ELECTRICAL PROTECTION circuit breaker #10, ASSEMBLY 1 AN414 and initials block. CUE: The breaker you have indicated is open. CIRCUIT#22  
Work Control Key Cabinet         equipment is obtained before the performance of the following actions. However, the following actions can be completed in any order.
*operator simulates opening FEEDWATER  
CUE: After the operator has obtained the equipment, inform the operator to return equipment to storage, and to assume that the Equipment Required has been obtained.
& RECIRC circuit breaker #22, INSTR. CAB. 10C612 and initials block. CUE: The breaker you have indicated is open. LOCATION PANEL# 54* *operator locates 1AJ483, CONTROL 1AJ483 DIESEL and simulates opening circuit RM 5102A breaker #7, CIRCUIT#?
: 1. BYPASS HPCI and RCIC high         *operator inserts one #172 (PA temperature isolation trips at   2235) key into switch B21 B-S6A the following (Key 172,           and rotates to the BYPASS PA2235, for all switches):       position,
and initials block. FUSE PANEL 1 YF405 CUE: The breaker you have indicated is open. Page 5of11 JPM NUMBER: PN005 REV NUMBER: 00 STEP (*Critical Step) SAT/ COMMENTS NUMBER ELEMENT (#Sequential Step) UNSAT (Required for STANDARD UNSAT)@ CIRCUIT#9  
* HPCI panel 1O-C-620,         and initials Attachment 1OA.
*operator simulates opening ELECTRICAL PROTECTION circuit breaker #9, ASSEMBLY 1 AN413 and initials block. CUE: The breaker you have indicated is open. CIRCUIT#15  
Switch 821 B-S6A CUE: The switch you have indicated is in the stated position.
*operator simulates opening ROD POSITION INFO CAB circuit breaker #15, 10C615 and initials block. CUE: The breaker you have indicated is open. CIRCUIT#21  
* HPCI panel 1O-C-641,         *operator inserts one #172 (PA Switch 821 B-S6C             2235) key into switch B21 B-S6C and rotates to the BYPASS position, and initials Attachment 1OA.
*operator simulates opening PROCESS INSTR. VERT. circuit breaker #21, BOARD 10C613 and initials block. CUE:
CUE: The switch you have indicated is in the stated position.
you have indicated is open. LOCATION PANEL# 54' *operator locates 1CJ483, CONTROL 1CJ483 DIESEL and simulates opening circuit RM 5102A breaker #6, CIRCUIT#6 ROD SEQUENCE CONTROL and initials block. CAB 10C659 CUE: The. breaker you have indicated is open. 4. NOTIFY CONTROL ROOM Operator notifies the control room, THAT 30 MINUTE SBO and initials Step. ACTIONS FOR ATTACHMENT 10A ARE COMPLETE and that you are continuing on with the remainder of the Attachment.
Page 3of11
CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME. REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
 
STOP TIME: Task Standard:
JPM NUMBER: ~~~~~~~~~-
Operator performs the 30 MINUTE SBO Actions of HC.OP-AB.ZZ-0135 Attachment 1 OA, Auxiliary Building Actions For SBO -Operator #1. @Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments.  
PN005                             NAME:   ~~~~~~~~~~~~~~~~-
[IER L 1-11-3 Rec. 3b] Page 6of11 SIMULATOR COPY __ OF __ EXAMINATION SCENARIO GUIDE SCENARIO TITLE: 2016 NRC EXAM SCENARI0-1 SCENARIO NUMBER: ESG-2016 NRC-1 EFFECTIVE DATE: Effective When Approved EXPECTED DURATION:
REV NUMBER:             00                             DATE:
1 Hour REVISION NUMBER: 1 PROGRAM: 0 LICENSED OPERATOR REQUALIFICATION cg] INITIAL LICENSE OOTHER: REVISION  
(*Critical Step)           COMMENTS STEP                                                                    SAT/
ELEMENT                       (#Sequential Step)           (Required for NUMBER                                                                  UNSAT STANDARD                 UNSAT)@
* RCIC panel 1O-C-621,         *operator inserts one #172 (PA Switch 821 B-S5B             2235) key into switch B21 B-S5B and rotates to the BYPASS position, and initials Attachment 1OA.
CUE: The switch you have indicated is in the stated position.
* RCIC panel 1O-C-640,         *operator inserts one #172 (PA Switch 821 B-S5D             2235) key into switch B21 B-S5D and rotates to the BYPASS position, and initials Attachment 1OA.
CUE: The switch you have indicated is in the stated position.
: 2. BLOCK OPEN the following doors in the Lower Relay Room.                 '         *operator opens and blocks 5335A,5302A,5302C,5316B,         open door 5335A using a Door 5318C                           Stop, Note: The doors may be blocked open in any order.
CUE: The door you have id.entified is blocked open.
                                        *operator opens and blocks open door 5302A using a Door Stop, CUE: The door you have identified is blocked open.
                                        *operator opens and blocks open door 5302C using a Door Stop, CUE: The door you have identified is blocked open.
                                        *operator opens and blocks open door 5316B using a Door Stop, CUE: The door you have identified is blocked open.
Page 4of11
 
JPM NUMBER:             PN005                         NAME:   ~~~~~~~~~~~~~~~~-
REV NUMBER:               00                           DATE:
(*Critical Step)               COMMENTS STEP                                                                        SAT/
ELEMENT                     (#Sequential Step)               (Required for NUMBER                                                                    UNSAT STANDARD                       UNSAT)@
                                        *operator opens and blocks open door 5318C using a Door Stop, and initials Attachment 1OA.
CUE: The door you have identified is blocked open.
: 3. OPEN the circuit breakers in   Operator reads and initials Step the following tables to shed   when complete.
non-essential loads.
Note: All of the following actions are located in 54' CONTROL DIESEL, RM 5102A.
I LOCATION     PANEL#
54*                       *operator locates 1BJ483, CONTROL 1BJ483 DIESEL                     and simulates opening circuit RM 5102A breaker #6, CIRCUIT#6                       and initials block.
FUSE PANEL 1YF406                                                   I CUE: The breaker you have indicated is open.
CIRCUIT#10                     *operator simulates opening ELECTRICAL PROTECTION           circuit breaker #10, ASSEMBLY 1AN414 and initials block.
CUE: The breaker you have indicated is open.
CIRCUIT#22                     *operator simulates opening FEEDWATER & RECIRC             circuit breaker #22, INSTR. CAB. 10C612 and initials block.
CUE: The breaker you have indicated is open.
LOCATION   PANEL#
54*                       *operator locates 1AJ483, CONTROL 1AJ483 DIESEL                     and simulates opening circuit RM 5102A breaker #7, CIRCUIT#?                       and initials block.
FUSE PANEL 1YF405 CUE: The breaker you have indicated is open.
Page 5of11
 
JPM NUMBER:     ~~~~~~~~~-
PN005 REV NUMBER:                   00
(*Critical Step)                       COMMENTS STEP                                                                            SAT/
ELEMENT                         (#Sequential Step)                       (Required for NUMBER                                                                          UNSAT STANDARD                             UNSAT)@
CIRCUIT#9                         *operator simulates opening ELECTRICAL PROTECTION             circuit breaker #9, ASSEMBLY 1AN413 and initials block.
CUE:   The breaker you have indicated is open.
CIRCUIT#15                         *operator simulates opening ROD POSITION INFO CAB             circuit breaker #15, 10C615 and initials block.
CUE:   The breaker you have indicated is open.
CIRCUIT#21                         *operator simulates opening PROCESS INSTR. VERT.               circuit breaker #21, BOARD 10C613 and initials block.
CUE:   Th~{breaker you have indicated is open.
LOCATION     PANEL#
54'                         *operator locates 1CJ483, CONTROL 1CJ483 DIESEL                         and simulates opening circuit RM 5102A breaker #6, CIRCUIT#6 ROD SEQUENCE CONTROL               and initials block.
CAB 10C659 CUE:   The. breaker you have indicated is open.
: 4. NOTIFY CONTROL ROOM               Operator notifies the control room, THAT 30 MINUTE SBO                 and initials Step.
ACTIONS FOR ATTACHMENT 10A ARE COMPLETE and that you are continuing on with the remainder of the Attachment.
CUE:   WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.
REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".
STOP TIME:
Task Standard: Operator performs the 30 MINUTE SBO Actions of HC.OP-AB.ZZ-0135 Attachment 1OA, Auxiliary Building Actions For SBO - Operator #1.
@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]
Page 6of11
 
SIMULATOR         COPY _ _ OF _ _
EXAMINATION SCENARIO GUIDE SCENARIO TITLE:           2016 NRC EXAM SCENARI0-1 SCENARIO NUMBER:         ESG-2016 NRC-1 EFFECTIVE DATE:           Effective When Approved EXPECTED DURATION:       1 Hour REVISION NUMBER:         1 PROGRAM:                 0   LICENSED OPERATOR REQUALIFICATION cg] INITIAL LICENSE OOTHER:
REVISION  


==SUMMARY==
==SUMMARY==
: 1. Minor editorial comments made from validation.
: 1. Minor editorial comments made from validation.
I. OBJECTIVE(S):
I. OBJECTIVE(S):
Enabling Objectives:
Enabling Objectives:
A. The crew must demonstrate the ability to operate effectively as a team while completing a series of CREW CRITICAL TASKS, which measure the crew's ability to safely operate the plant during normal, abnormal, and emergency plant conditions. (Crew critical tasks within this examination scenario guide are identified with an"*".) II. MAJOR EVENTS: A. Remove EOG From Service 8. EOG Trip C. Raise Reactor power using Control Rods. D. Stuck Control Rod E. Seismic Event (>OBE) I EHC Filter Clogging F. Safety Relief Valve Stuck Open G.ATWS H. SBLC Failure to Auto Start I SBLC Pump B Failure on Start I. RWCU Failure to Automatically Isolate J. Loss of EHC K. RHR Pump Trip Ill. SCENARIO  
A. The crew must demonstrate the ability to operate effectively as a team while completing a series of CREW CRITICAL TASKS, which measure the crew's ability to safely operate the plant during normal, abnormal, and emergency plant conditions.
(Crew critical tasks within this examination scenario guide are identified with an"*".)
II. MAJOR EVENTS:
A. Remove EOG From Service
: 8. EOG Trip C. Raise Reactor power using Control Rods.
D. Stuck Control Rod E. Seismic Event (>OBE) I EHC Filter Clogging F. Safety Relief Valve Stuck Open G.ATWS H. SBLC Failure to Auto Start I SBLC Pump B Failure on Start I. RWCU Failure to Automatically Isolate J. Loss of EHC K. RHR Pump Trip Ill. SCENARIO  


==SUMMARY==
==SUMMARY==
: The scenario begins with the plant at approximately 88% power; with power ascension in progress following maintenance on RFPT AP101, and an Emergency Diesel Generator test in progress.
The scenario begins with the plant at approximately 88% power; with power ascension in progress following maintenance on RFPT AP101, and an Emergency Diesel Generator test in progress. The EOG will trip during its removal from testing, making the EOG inoperable.
The EOG will trip during its removal from testing, making the EOG inoperable.
After Technical Specifications are addressed, the crew will continue with the power ascension. A stuck rod will require actions to raise drive pressure to move the rod. EHC Filter clogging will occur during a seismic event. Actions will be successful in preventing a loss of EHC pressure. A SRV will open requiring a Reactor Scram to comply with Technical Specifications. An ATWS occurs on the scram. The Standby Liquid Control System will fail to automatically initiate, and one pump will fail after the system is manually placed in service.
After Technical Specifications are addressed, the crew will continue with the power ascension.
Reactor Water Cleanup System will need to be manually isolated following SLC initiation. A loss of EHC will remove the Main Turbine and Bypass Valves from the pressure control strategy. The first RHR pump to be placed in service will trip requiring another pump be placed in service for containment control.
A stuck rod will require actions to raise drive pressure to move the rod. EHC Filter clogging will occur during a seismic event. Actions will be successful in preventing a loss of EHC pressure.
ESG-2016 NRC-1                               Page 2 of 28                                       Rev. 1
A SRV will open requiring a Reactor Scram to comply with Technical Specifications.
 
An ATWS occurs on the scram. The Standby Liquid Control System will fail to automatically initiate, and one pump will fail after the system is manually placed in service. Reactor Water Cleanup System will need to be manually isolated following SLC initiation.
IV. INITIAL CONDITIONS:
A loss of EHC will remove the Main Turbine and Bypass Valves from the pressure control strategy.
I     l.C.
The first RHR pump to be placed in service will trip requiring another pump be placed in service for containment control. ESG-2016 NRC-1 Page 2 of 28 Rev. 1 IV. INITIAL CONDITIONS:
lnftial I
I l.C. lnftial I INITIALIZE the simulator to 100% power, MOL, T ACS on SACS A. ---REDUCE Reactor Power to 88% with Recirculation Pumps, and inserting Groups 1 OA and 1 OB rods. ___ ENSURE Recirculation Pump A speed is NOT 68-71% AND Pump B speed is NOT 67-73%. STABILIZE Xenon concentration.  
- - - INITIALIZE the simulator to 100% power, MOL, T ACS on SACS A.
------ENSURE SACS Pump BP210 is in service, AND SACS Pump DP210 is in standby. ENSURE RACS Pumps Band Care in service. ---___ ENSURE EHC Pump AP116 is in service. START AG400 and load IAW HC.OP-ST.KJ-0001to1000 kw and 50-200 KvAR. ---PREP FOR TRAINING (i.e., RM-11 set points, procedures, bezel covers) Initial I ___ INITIAL IO.ZZ-0006;for the power ascension.  
REDUCE Reactor Power to 88% with Recirculation Pumps, and inserting Groups 1OA and 1OB rods.
---ENSURE REMA is provided to support power ascension.
_ _ _ ENSURE Recirculation Pump A speed is NOT 68-71% AND Pump B speed is NOT 67-73%.
Withdrawing 1 OA rods then TCF adjustment.
STABILIZE Xenon concentration.
MARKUP HC.OP-ST.KJ-0001to Step 5.4.13.D.  
- - - ENSURE SACS Pump BP210 is in service, AND SACS Pump DP210 is in standby.
---REVIEW the Scenario Reference section and CLEAN the balded EOPs, ABs and SOPs listed (at a ---minimum).  
ENSURE RACS Pumps Band Care in service.
(80091396 0270) ---COMPLETE the Simulator Ready for Training/Examination Checklist.
_ _ _ ENSURE EHC Pump AP116 is in service.
ESG-2016 NRC-1 Page 3 of 28 Rev. 1 EVENT FILE: Initial Event 4 Event Code: ET _ARRAY(2)  
- - - START AG400 and load IAW HC.OP-ST.KJ-0001to1000 kw and 50-200 KvAR.
& ZL TUEHSB
PREP FOR TRAINING (i.e., RM-11 set points, procedures, bezel covers)
Initial I
_ _ _ INITIAL IO.ZZ-0006;for the power ascension.
- - - ENSURE REMA is provided to support power ascension. Withdrawing 1OA rods then TCF adjustment.
- - - MARKUP HC.OP-ST.KJ-0001to Step 5.4.13.D.
REVIEW the Scenario Reference section and CLEAN the balded EOPs, ABs and SOPs listed (at a
---         minimum). (80091396 0270)
- - - COMPLETE the Simulator Ready for Training/Examination Checklist.
ESG-2016 NRC-1                                 Page 3 of 28                                           Rev. 1
 
EVENT FILE:
Initial Event Event Code: ET_ARRAY(2) & ZL TUEHSB 4


== Description:==
== Description:==
ET-2 ACTIVE & EHC B STARTED Event Code:  lcvposx(1) <= 700 5


ET-2 ACTIVE & EHC B STARTED 5 Event Code: lcvposx(1)
== Description:==
<= 700
Rod 18-03 Position Event Code: sl_pmbrn 6


== Description:==
== Description:==
SLC Pump B Running Event Code:  rh_bkr(1) & !et_array(14) 13


Rod 18-03 Position 6 Event Code: sl_pmbrn
== Description:==
RHR A Running First Event Code:  rh_bkr(2) & !et_array(13) 14
 
== Description:==
RHR B Running First Event Code:  ZLLCWHIT(123) & (A3015_V >=308) 15
 
== Description:==
Rod 30-39 Selected AND Drive Pressure >=308 psid Event Code: MONVAR(18) ~700 16


== Description:==
== Description:==
RPV Pressure ~_700 psig ESG-2016 NRC-1                          Page 4 of 28                        Rev. 1


SLC Pump B Running 13 Event Code: rh_bkr(1)
MALFUNCTION SCHEDULE:
& !et_array(14)  
Initial @Time  Event                      Action                                  Description RWCU isolation valve F001 failure to None  None  Insert malfunction CU11A auto close RWCU isolation valve F004 failure to None  None  Insert malfunction CU11 B auto close SBLC pump A failure of auto start None  None  Insert malfunction SL04A signal SBLC pump B failure of auto start None  None  Insert malfunction SL04B signal None  None  Insert malfunction RP06                        Half-core ATWS - left side None None  Insert malfunction CD033039                    Control Rod 30-39 stuck None None  Insert malfunction PC07 A on event 2          Seismic Event I Insert malfunction TC16 to 30.00000 in 120 on None None                                                EHC pump discharge filter plugging event2 ADS/Relief valve F013D (MS LINE D)
None None  Insert malfunction AD02DO on event 3 I
sticks open Insert malfunction TC16 to 0 on event 4 delete None None                                                EHC pump discharge filter plugging in 1 None None  Insert malfunction RPO? after 2 on event 5    Half-core ATWS - right side None None  Insert malfunction SL01 B after 5 on event 6  SBLC injection pump BP208 failure
        .None  None  Insert malfunction TCO?A after 300 on event 6  EHC pump A trip None  None Insert malfunction TCO?B after 300 on event 6  EHC pump B trip Insert malfunction TC01-10 after 420 on event None None                                                All turbine bypass valves fail closed 6
Insert malfunction QQ20 to SHORT on event None None                                                RHR pump AP202 Malfunctions 13 Insert malfunction QQ21 to SHORT on event None None                                                RHR pump BP202 Malfunctions 14 Insert malfunction CD033039 on event 15 None  None                                                Control Rod 30-39 stuck delete in 1 Insert malfunction AD02DO on event 16 delete  ADS/Relief valve F013D (MS LINE D)
None  None in 1                                          sticks open None None  Insert malfunction DG02A on event 17          Diesel generator A failure ESG-2016 NRC-1                            Page 5 of 28                                              Rev. 1


==
REMOTE SCHEDULE:
Description:==
Initial @Time Event                    Action                                  Description Insert remote EP01 after 360 to BYPASS on    EP01 EOP-301, bypass MSIV (-129")
None None events                                      isolation interlock Insert remote EP02 after 480 to BYPASS on    EP02 EOP-311, bypass PCIG (-129")
None None event 9                                      isolation interlock Insert remote EP38 after 180 to Emergency on EP38 EOP-319, Restoring Instrument None None event 10                                    Air in an Emergency Insert remote EP09 after 240 to REMOVED on  EP09 EOP-320 (step 5.1.2), ARI valve None None event 11                                    fuses F6A/F5A Insert remote EP1 O after 240 to REMOVED on  EP10 EOP-320 (step 5.1.4), ARI valve None None event 11                                    fuses F6B/F5B Insert remote EP11 after 360 to INSTALLED    EP11 EOP-320 (step 5.2.2), RPS None None on event 11                                  division 1 jumper Insert remote EP12 after 360 to INSTALLED    EP12 EOP-320 (step 5.2.4), RPS None None on event 11                                  division 2 jumper Insert remote EP13 after 360 to INSTALLED    EP13 EOP-320 (step 5.2.3), RPS None None on event 11                                  division 3 jumper Insert remote EP14 after 360 to INSTALLED    EP14 EOP-320 (step 5.2.5), RPS None None on event 11                                  division 4 jumper Insert remote EP35 after 180 to FAIL_CLOSE None None                                              EP35 EOP-322 HV-F006 HPCI to CS on event 12 OVERRIDE SCHEDULE:
Initial @Time Event                    Action                                  Description ESG-2016 NRC-1                            Page 6 of 28                                        Rev. 1


RHR A Running First 14 Event Code: rh_bkr(2)
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity                                  Comments
& !et_array(13)


==
===Response===
Description:==
* CRS directs unloading and Removing AG400 From Service:     securing 1AG400 in accordance with HG.OP-ST.KJ-0001.
* PO unloads and secures 1AG400 IAW HC.OP-ST.KJ-0001:
                                => Presses DIESEL ENG GOV DECR PB and lowers load to 50-200 kw
                                => Presses TRIP for EOG AG400 40107 Gen Brkr.
                                => Uses GEN VR RAISE OR LOWER PBs CYCLE Generator terminal voltage between 4056V and 4394V              I (one complete cycle) then returns voltage to approximately 4160V.
                                => Presses GEN VR MAN PB and ensures the MAN light is on.
                                => Uses GEN VR RAISE OR LOWER PBs, CYCLE                    ,,
Generator terminal voltage between 4056V and 4394V (one complete cycle), then returns voltage to approximately 4160V.
                                => Presses GEN VR AUTO PB and ensures the AUTO light is on.
ESG-2016 NRC-1                    Page 7 of 28                          Rev. 1


RHR B Running First 15 Event Code: ZLLCWHIT(123)
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity                                            Comments
& (A3015_V >=308)


== Description:==
===Response===
EOG Trip
* Crew recognizes EOG problem by:
BEFORE the operator stops the          => OHA E4-A3 DIESEL ENG EOG, or at the discretion of the          PNL A/B/C/D C423 Lead Examiner, TRIGGER ET-17          => OHA E4-A2 DIESEL GEN PNL A/B/C/D C422 REPORT as ABEO that there is a        => GRIDS 03776 DG A large oil leak from EOG A.                REGULAR LOCKOUT RELAY Report as EO that the oil leak is
* CRS declares EOG A            Perform Surveillance stopped. Cleanup is in progress.      inoperable and enters Tech    Requirement 4.8.1.1.1.a Spec 3.8.1.1.                within 1 hour and at least once per 8 hours thereafter.
If notified as SM/Work Control state                                Restore the inoperable that ST.ZZ-0001 will be performed
* diesel generator to by another operator. Continue with                                  OPERABLE status power ascension.                                                    within 72 hours, OR Verify the Salem Unit 3 gas turbine generator (GTG) is available within 72 hours and once per 12 hours thereafter*, and restore the inoperable diesel generator to OPERABLE status within 14 days.
Power Ascension:
* CRS directs power ascension IAW 10-6.
As RE, PROVIDE the following
* CRS directs withdrawing guidance:                              control rods IAW RE guidance.
* Withdraw Control Rods IAW REMA.
* Emergency Load reductions will be performed using SPRG.
ESG-2016 NRC-1                        Page 8 of 28                                  Rev. 1
 
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity                                              Comments


Rod 30-39 Selected AND Drive Pressure >=308 psid 16 Event Code: MONVAR(18)  
===Response===
* RO withdraws control rods IAW REMA guidance and HC.OP-SO.SF-0001.
                                  =:. Presses the desired Control Rod Select PB
                                  =:. Momentarily presses the WITHDRAW PB
                                  =:. After the withdrawal cycle is completed, ENSURE that the rod position indicates that the rod is in the correct, even numbered position and initials REMA.
Rod 30-39 Stuck:
* RO determines rod 30-39 is stuck and informs the CRS.
Rod 30-39 Stuck is pre-inserted.
CRS refers to TIS
* CRS Implements AB.IC 0001 3.1.3.1 if rod is
                                  =:. Condition F determined to be non-moveable.
* RO performs actions of Condition F of AB.IC-0001:
                                  =:. Verifies NO Rod Blocks are present.
                                  =:. Attempts to operate the drive in both directions to determine the exact condition of the Control Rod.
                                  =:. Vent Control Rod using Continuous Insert PB.
                                  =:. Attempts to withdraw Control Rod using Withdraw PB (including Continuous Withdraw PB).
ESG-2016 NRC-1                      Page 9 of 28                                      Rev. 1


==
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity                                      Comments
Description:==


RPV Pressure psig ESG-2016 NRC-1 Page 4 of 28 Rev. 1 MALFUNCTION SCHEDULE:
===Response===
Initial @Time Event Action Description None None Insert malfunction CU11A RWCU isolation valve F001 failure to auto close None None Insert malfunction CU11 B RWCU isolation valve F004 failure to auto close None None Insert malfunction SL04A SBLC pump A failure of auto start signal None None Insert malfunction SL04B SBLC pump B failure of auto start signal None None Insert malfunction RP06 Half-core A TWS -left side None None Insert malfunction CD033039 Control Rod 30-39 stuck None None Insert malfunction PC07 A on event 2 Seismic Event I None None Insert malfunction TC16 to 30.00000 in 120 on EHC pump discharge filter plugging event2 None None Insert malfunction AD02DO on event 3 ADS/Relief valve F013D (MS LINE D) I sticks open None None Insert malfunction TC16 to 0 on event 4 delete EHC pump discharge filter plugging in 1 None None Insert malfunction RPO? after 2 on event 5 Half-core ATWS -right side None None Insert malfunction SL01 B after 5 on event 6 SBLC injection pump BP208 failure .None None Insert malfunction TCO?A after 300 on event 6 EHC pump A trip None None Insert malfunction TCO?B after 300 on event 6 EHC pump B trip None None Insert malfunction TC01-10 after 420 on event All turbine bypass valves fail closed 6 None None Insert malfunction QQ20 to SHORT on event RHR pump AP202 Malfunctions 13 None None Insert malfunction QQ21 to SHORT on event RHR pump BP202 Malfunctions 14 None None Insert malfunction CD033039 on event 15 Control Rod 30-39 stuck delete in 1 None None Insert malfunction AD02DO on event 16 delete ADS/Relief valve F013D (MS LINE D) in 1 sticks open None None Insert malfunction DG02A on event 17 Diesel generator A failure ESG-2016 NRC-1 Page 5 of 28 Rev. 1 REMOTE SCHEDULE:
::::;. Simultaneously presses and holds both the Withdraw PB and the Continuous Withdraw PB.
Initial @Time Event Action Description None None Insert remote EP01 after 360 to BYPASS on EP01 EOP-301, bypass MSIV (-129") events isolation interlock None None Insert remote EP02 after 480 to BYPASS on EP02 EOP-311, bypass PCIG (-129") event 9 isolation interlock None None Insert remote EP38 after 180 to Emergency on EP38 EOP-319, Restoring Instrument event 10 Air in an Emergency None None Insert remote EP09 after 240 to REMOVED on EP09 EOP-320 (step 5.1.2), ARI valve event 11 fuses F6A/F5A None None Insert remote EP1 O after 240 to REMOVED on EP10 EOP-320 (step 5.1.4), ARI valve event 11 fuses F6B/F5B None None Insert remote EP11 after 360 to INSTALLED EP11 EOP-320 (step 5.2.2), RPS on event 11 division 1 jumper None None Insert remote EP12 after 360 to INSTALLED EP12 EOP-320 (step 5.2.4), RPS on event 11 division 2 jumper None None Insert remote EP13 after 360 to INSTALLED EP13 EOP-320 (step 5.2.3), RPS on event 11 division 3 jumper None None Insert remote EP14 after 360 to INSTALLED EP14 EOP-320 (step 5.2.5), RPS on event 11 division 4 jumper None None Insert remote EP35 after 180 to FAIL_CLOSE EP35 EOP-322 HV-F006 HPCI to CS on event 12 OVERRIDE SCHEDULE:
::::;. Momentarily presses and then releases the CONTINUOUS INSERT PB(this step may be repeated).
Initial @Time Event Action Description ESG-2016 NRC-1 Page 6 of 28 Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Comments Response
::::;. Releases both the Withdraw PB and the Continuous Withdraw PB.
* CRS directs unloading and Removing AG400 From Service: securing 1 AG400 in accordance with HG.OP-ST.KJ-0001.
::::;. Raises the drive water pressure in approximately I                     50 psid increments, not to exceed 500 psid (to approximately 315 psig) by throttling closed HV-F003
* PO unloads and secures 1AG400 IAW HC.OP-ST.KJ-0001: => Presses DIESEL ENG GOV DECR PB and lowers load to 50-200 kw => Presses TRIP for EOG AG400 40107 Gen Brkr. => Uses GEN VR RAISE OR LOWER PBs CYCLE Generator terminal voltage between 4056V and 4394V I (one complete cycle) then returns voltage to approximately 4160V. => Presses GEN VR MAN PB and ensures the MAN light is on. => Uses GEN VR RAISE OR LOWER PBs, CYCLE ,, Generator terminal voltage between 4056V and 4394V (one complete cycle), then returns voltage to approximately 4160V. => Presses GEN VR AUTO PB and ensures the AUTO light is on. ESG-2016 NRC-1 Page 7 of 28 Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student Comments Response EOG Trip
::::;. Attempts to notch in OR notch out the control rod at each new pressure increment.
* Crew recognizes EOG BEFORE the operator stops the problem by: => OHA E4-A3 DIESEL ENG EOG, or at the discretion of the PNL A/B/C/D C423 Lead Examiner, TRIGGER ET-17 => OHA E4-A2 DIESEL GEN PNL A/B/C/D C422 REPORT as ABEO that there is a => GRIDS 03776 DG A large oil leak from EOG A. REGULAR LOCKOUT RELAY Report as EO that the oil leak is
* CRS declares EOG A Perform Surveillance stopped. Cleanup is in progress.
inoperable and enters Tech Requirement 4.8.1.1.1.a Spec 3.8.1.1. within 1 hour and at least once per 8 hours thereafter.
If notified as SM/Work Control state Restore the inoperable that ST.ZZ-0001 will be performed
* diesel generator to by another operator.
Continue with OPERABLE status power ascension.
within 72 hours, OR Verify the Salem Unit 3 gas turbine generator (GTG) is available within 72 hours and once per 12 hours thereafter*, and restore the inoperable diesel generator to OPERABLE status within 14 days. Power Ascension:
* CRS directs power ascension IAW 10-6. As RE, PROVIDE the following
* CRS directs withdrawing guidance:
control rods IAW RE guidance.
* Withdraw Control Rods IAW REMA.
* Emergency Load reductions will be performed using SPRG. ESG-2016 NRC-1 Page 8 of 28 Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student Comments Response
* RO withdraws control rods IAW REMA guidance and HC.OP-SO.SF-0001.
=:. Presses the desired Control Rod Select PB =:. Momentarily presses the WITHDRAW PB =:. After the withdrawal cycle is completed, ENSURE that the rod position indicates that the rod is in the correct, even numbered position and initials REMA. Rod 30-39 Stuck:
* RO determines rod 30-39 is stuck and informs the CRS. Rod 30-39 Stuck is pre-inserted.
* CRS Implements AB.IC 0001 CRS refers to TIS Condition F 3.1.3.1 if rod is =:. determined to be non-moveable.
,,
* RO performs actions of Condition F of AB.IC-0001:
=:. Verifies NO Rod Blocks are present. =:. Attempts to operate the drive in both directions to determine the exact condition of the Control Rod. =:. Vent Control Rod using Continuous Insert PB. =:. Attempts to withdraw Control Rod using Withdraw PB (including Continuous Withdraw PB). ESG-2016 NRC-1 Page 9 of 28 Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Comments Response ::::;. Simultaneously presses and holds both the Withdraw PB and the Continuous Withdraw PB. ::::;. Momentarily presses and then releases the CONTINUOUS INSERT PB(this step may be repeated).  
::::;. Releases both the Withdraw PB and the Continuous Withdraw PB. ::::;. Raises the drive water pressure in approximately I 50 psid increments, not to exceed 500 psid (to approximately 315 psig) by throttling closed HV-F003 ::::;. Attempts to notch in OR notch out the control rod at each new pressure increment.
* RO determines that the control rod is freed and returns the drive water pressure to the normal operating range (260-270 psid on A3015).
* RO determines that the control rod is freed and returns the drive water pressure to the normal operating range (260-270 psid on A3015).
* RO ensures that rod 30-39 is at the desired position and initials REMA. ESG-2016 NRC-1 Page 10 of 28 Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student Comments Response Earthquake:
* RO ensures that rod 30-39 is at the desired position and initials REMA.
* Crew recognizes Seismic After CRD is returned to normal Event by: and at the discretion of the Lead OHA C6-C4 "SEISMIC Examiner, MON PNL C673"
ESG-2016 NRC-1                   Page 10 of 28                             Rev. 1
* PLAY the Earthquake Sound GRIDS D3977 "SEISMIC Effect (if available}
 
at medium TROUBLE ALARM TRBL" volume for about 15 seconds Response Spectrum OR Analyzer indications on ANNOUNCE "You feel motion 10C650C then it stops", AND TRIGGER Loud rumbling noise ET-2 (if available)
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity                                   Comments
* Crew monitors critical parameters to determine if plant is stable. I !E Crew calls National Earthquake
 
* CRS implements Center, AB.MISC-0001:
===Response===
THEN REPORT a seismic event of Condition E 6.0 on Richter scale centered 12 Condition F miles east of Wilmington, DE. !E Crew calls Security,
Earthquake:
* RO/PO implements THEN REPORT the Security AR.ZZ-0011 Attachment C4. system is intact. !E dispatched to 1 OC673,
* Crew recognizes Seismic After CRD is returned to normal       Event by:
* Crew dispatches ABEO to THEN REPORT: 10C673.
and at the discretion of the Lead     ~  OHA C6-C4 "SEISMIC Examiner,                                 MON PNL C673" GRIDS D3977 "SEISMIC
* PLAY the Earthquake Sound           ~
TROUBLE ALARM TRBL" Effect (if available} at medium volume for about 15 seconds       ~  Response Spectrum OR                                   Analyzer indications on ANNOUNCE "You feel motion             10C650C then it stops", AND TRIGGER       ~  Loud rumbling noise ET-2                                 (if available)
* Crew monitors critical parameters to determine if plant is stable.     I
!E Crew calls National Earthquake
* CRS implements Center,                               AB.MISC-0001:
THEN REPORT a seismic event of       ~  Condition E 6.0 on Richter scale centered 12     ~  Condition F miles east of Wilmington, DE.
!E Crew calls Security,
* RO/PO implements THEN REPORT the Security             AR.ZZ-0011 Attachment C4.
system is intact.
!E dispatched to 1OC673,
* Crew dispatches ABEO to THEN REPORT:                         10C673.
* The Event Indicator is WHITE
* The Event Indicator is WHITE
* Crew recognizes a seismic
* Crew recognizes a seismic
* The tape machines have event >0.1 g has occurred advanced but are not running
* The tape machines have             event >0.1 g has occurred advanced but are not running
* The Amber Alarm light on the Seismic Switch Power Supply drawer is lit. IF directed to reset 1 OC673,
* The Amber Alarm light on the Seismic Switch Power Supply drawer is lit.
* RO/PO directs ABEO to reset THEN DELETE Malfunction 1 OC673 IAW SO.SG-0001.
IF directed to reset 1OC673,
* RO/PO directs ABEO to reset THEN DELETE Malfunction               1OC673 IAW SO.SG-0001.
PC07A.
PC07A.
* RO/PO record Seismic Response Spectrum Analyzer lights on AR.ZZ-0011 Att. C4-1. ESG-2016 NRC-1 Page 11 of 28 Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student Comments Response
* RO/PO record Seismic Response Spectrum Analyzer lights on AR.ZZ-0011 Att.
C4-1.
ESG-2016 NRC-1                       Page 11 of 28                     Rev. 1
 
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity                                           Comments
 
===Response===
* RO/PO reset Seismic Response Spectrum Analyzer IAW SO.SG-0001.
* RO/PO reset Seismic Response Spectrum Analyzer IAW SO.SG-0001.
IF directed to investigate EOG
IF directed to investigate EOG
* RO/PO investigates A EOG alarms, THEN REPORT alarms LO and HI Priority Alarms. were Fuel Oil Day Tank Hi/Lo alarms. EHC Filter Clogging:
* RO/PO investigates A EOG alarms, THEN REPORT alarms             LO and HI Priority Alarms.
* Crew recognizes clogging of EHC Filter Clogging is automatically AP116 EHC pump discharge filter by: inserted on ET-2. => OHA D3-F5 "TURB HYDR PUMP TROUBLE" => GRIDS 03627 "MAIN ' TURB EHC PUMP A FILTER DP" lnSight Item:
were Fuel Oil Day Tank Hi/Lo alarms.
* RO/PO responds to OHA IAW CRS may refer to
EHC Filter Clogging:
* EHC Header Pressure HC.OP-AR.ZZ-0014 and AB.BOP-0003.
* Crew recognizes clogging of AP116 EHC pump discharge EHC Filter Clogging is automatically   filter by:
tupehchd HC.OP-AR.ZZ-0024.
inserted on ET-2.                     => OHA D3-F5 "TURB HYDR PUMP TROUBLE"
                                      =>   GRIDS   03627 "MAIN TURB EHC PUMP A FILTER DP" lnSight Item:
* RO/PO responds to OHA IAW       CRS may refer to
* EHC Header Pressure             HC.OP-AR.ZZ-0014 and           AB.BOP-0003.
tupehchd                         HC.OP-AR.ZZ-0024.
* EHC Pump Disch Pressure tup.ehc(1-2)
* EHC Pump Disch Pressure tup.ehc(1-2)
* EHC Pump Filter D/P tupehcdp(1-2)
* EHC Pump Filter D/P tupehcdp(1-2)
IF dispatched to the EHC pump,
IF dispatched to the EHC pump, THEN REPORT AP116 discharge
* RO/PO directs EO to the EHC THEN REPORT AP116 discharge skid to investigate the problem filter dp is very high.
* RO/PO directs EO to the EHC skid to investigate the problem filter dp is very high.
* RO/PO presses HYDR FLUID PUMP B MAN Pb. ENSURE ET-4 actuates when RO/PO presses BP116 BP116 is started.
* RO/PO presses HYDR FLUID PUMP B MAN Pb.
* START Pb and ensures HDYR FLUID PUMP BLOW DISCH PRESS is OFF. IF dispatched to swap EHC filters,
ENSURE ET-4 actuates when BP116 is started.
* RO/PO directs EO to SWAP THEN REPORT EHC Pump AP116 the AP116 HYDR FLUID filters have been swapped. PUMP in service Discharge Filter IAW HG.OP-SO.CH-0001 (Q). ESG-2016 NRC-1 Page 12 of 28 Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Comments Response
* RO/PO presses BP116 START Pb and ensures HDYR FLUID PUMP BLOW DISCH PRESS is OFF.
IF dispatched to swap EHC filters, THEN REPORT EHC Pump AP116
* RO/PO directs EO to SWAP the AP116 HYDR FLUID filters have been swapped.             PUMP in service Discharge Filter IAW HG.OP-SO.CH-0001 (Q).
ESG-2016 NRC-1                       Page 12 of 28                                   Rev. 1
 
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity                                           Comments
 
===Response===
* RO/PO presses HYDR FLUID PUMP A STOP Pb.
* RO/PO presses HYDR FLUID PUMP A STOP Pb.
* RO/PO presses HYDR FLUID PUMP A AUTO Pb. Stuck Open SRV:
* RO/PO presses HYDR FLUID PUMP A AUTO Pb.
* Crew recognizes SRV open At the discretion of the Lead by: =:> OHA C1-A3 "ADS/SAFETY Examiner, TRIGGER ET-3 (PSV RELIEF VALVE NOT F013D Inadvertent Opening).
Stuck Open SRV:
CLOSED" =:> Acoustic Monitor Indication on 10C650C =:> Tailpipe temperature on TR-R614 =:> L:.owering MWe =:> Steam Flow to Feed Flow mismatch =:> RPV level swell lnSight Items:
* Crew recognizes SRV open by:
At the discretion of the Lead     =:> OHA C1-A3 "ADS/SAFETY Examiner, TRIGGER ET-3 (PSV             RELIEF VALVE NOT F013D Inadvertent Opening).             CLOSED"
                                  =:> Acoustic Monitor Indication on 10C650C
                                  =:> Tailpipe temperature on TR-R614
                                  =:> L:.owering MWe
                                  =:> Steam Flow to Feed Flow mismatch
                                  =:> RPV level swell lnSight Items:
* PO cycles SRV control switch
* PO cycles SRV control switch
* PSV-F013D Position in attempt to close the SRV . advpos(4)
* PSV-F013D Position               in attempt to close the SRV .
* F013D B Channel Switch ,, zdads1(4)
advpos(4)
* F013D B Channel Switch                 ,,
zdads1(4)
* F013D D Channel Switch zdads2(4)
* F013D D Channel Switch zdads2(4)
* CRS implements AB. RPV-0006.
* CRS implements AB. RPV-0006.
* CRS recognizes SRV will not Action taken to comply close within two minutes, with T/S 3.4.2.1.b.
Action taken to comply
directs: =:> Reducing recirc pumps to minimum speed =:> Locking the Mode Switch in SHUTDOWN ESG-2016 NRC-1 Page 13 of 28 Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student Comments Response
* CRS recognizes SRV will not with T/S 3.4.2.1.b.
* RO performs the following:  
close within two minutes, directs:
:::;. Reduces Recirc Pumps A & B to minimum speed :::;. Locks the Mode Switch in SHUTDOWN :::;. Performs scram actions IAW AB.ZZ-0001 Att. 1. ATWS >4%:
                                  =:> Reducing recirc pumps to minimum speed
* Crew recognizes Scram Condition and Reactor Power The half core A TWS is already Above 4% EOP entry inserted on the right side of the condition:
                                  =:> Locking the Mode Switch in SHUTDOWN ESG-2016 NRC-1                   Page 13 of 28                                     Rev. 1
core. :::;. Rod FULL IN lights on Full Core Display Not lit as I expected :::;. APRM indications show higher than expected power levels
 
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity                                             Comments
 
===Response===
* RO performs the following:
:::;. Reduces Recirc Pumps A
                                          & B to minimum speed
:::;. Locks the Mode Switch in SHUTDOWN
:::;. Performs scram actions IAW AB.ZZ- 0001 Att. 1.
ATWS >4%:
* Crew recognizes Scram Condition and Reactor Power The half core A TWS is already     Above 4% EOP entry inserted on the right side of the   condition:
core.                               :::;. Rod FULL IN lights on Full Core Display Not lit as               I expected
:::;. APRM indications show higher than expected power levels
* CRS enters EOP-101A.
* CRS enters EOP-101A.
* Crew recognizes RPV Level Below 12.5" EOP entry ,, condition by: :::;. OHA C5-A4 "RPV WATER LEVEL LO" :::;. OHA A7-D5 "RPV LEVEL 3" :::;. Various water level indicators
* Crew recognizes RPV Level                   ,,
* CRS directs: :::;. Initiating SLC :::;. Verifying RWCU Isolates
Below 12.5" EOP entry condition by:
* Crew starts AP208 SLC ENTER Suppression pump before Suppression Pool temp when AP208 Pool temperature reaches SLC pump is started: 110 degrees. Temp: ESG-2016 NRC-1 Page 14 of 28 Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student Comments Response RWCU Failure to Isolate:
:::;. OHA C5-A4 "RPV WATER LEVEL LO"
* RO/PO manually initiates SLC identifies that RWCU FAILS to RWCU failure is pre-inserted.
:::;. OHA A7-D5 "RPV LEVEL 3"
isolate, isolates RWCU by closing HV-F001 and HV-F004, and notifies CRS of responses and actions taken. Failure of SLC to Auto-Start/Trip
:::;. Various water level indicators
* Crew recognizes trip of BP208 of SLC Pump: SLC pump by: => OHA C1-B1 "SLC The BP208 SLC pump will trip 5 PUMPNALVE O/PF" seconds after starting.
* CRS directs:
=> OHA C1-F1 "SLC/RRCS INITIATION FAILURE" => CRIDS D3023 "SLC INJ I PMP BP208 TROUBLE TRBL" => Flashing STOP light for BP208 IF dispatched to investigate trip of
:::;. Initiating SLC
* Crew dispatches NEO and BP208, Maintenance to investigate trip THEN REPORT the motor is hot to of BP208 SLC pump. the touch and the breaker will not reset. (52-222101)
:::;. Verifying RWCU Isolates Crew starts AP208 SLC           ENTER Suppression
* CRS directs: => Verifying Recirc runback to minimum => Tripping reactor recirc pumps
* Pool temp when AP208 pump before Suppression Pool temperature reaches         SLC pump is started:
* RO/PO: => Verifies Recirc runback to minimum => Trips reactor Recirc Pumps
110 degrees.                     Temp:
ESG-2016 NRC-1                     Page 14 of 28                                   Rev. 1
 
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity                                       Comments
 
===Response===
RWCU Failure to Isolate:
* RO/PO manually initiates SLC identifies that RWCU FAILS to RWCU failure is pre-inserted.         isolate, isolates RWCU by closing HV-F001 and HV-F004, and notifies CRS of responses and actions taken.
Failure of SLC to Auto-Start/Trip
* Crew recognizes trip of BP208 of SLC Pump:                           SLC pump by:
                                      => OHA C1-B1 "SLC The BP208 SLC pump will trip 5             PUMPNALVE O/PF"
                                      => OHA C1-F1 "SLC/RRCS seconds after starting.
INITIATION FAILURE"
                                      => CRIDS D3023 "SLC INJ I
PMP BP208 TROUBLE TRBL"
                                      => Flashing STOP light for BP208 IF dispatched to investigate trip of
* Crew dispatches NEO and BP208,                                 Maintenance to investigate trip THEN REPORT the motor is hot to       of BP208 SLC pump.
the touch and the breaker will not reset. (52-222101)
* CRS directs:
                                      => Verifying Recirc runback to minimum
                                      => Tripping reactor recirc pumps
* RO/PO:
                                      => Verifies Recirc runback to minimum
                                      => Trips reactor Recirc Pumps
* CRS directs inhibiting ADS .
* CRS directs inhibiting ADS .
* RO/PO inhibits ADS IAW AB.ZZ-0001 Att. 13. ESG-2016 NRC-1 Page 15 of 28 Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student Comments Response
* RO/PO inhibits ADS IAW AB.ZZ-0001 Att. 13.
* CREW prevents an This Critical Task is not uncontrolled applicable if RPV level depressurization during never reaches -129". A TWS conditions by See justification for preventing ADS failure criteria.
ESG-2016 NRC-1                       Page 15 of 28                         Rev. 1
 
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity                                                         Comments
 
===Response===
CREW prevents an                 This Critical Task is not
* applicable if RPV level uncontrolled depressurization during           never reaches -129".
A TWS conditions by               See justification for preventing ADS                   failure criteria.
ACTUATION.
ACTUATION.
REFER to the appropriate EOP and
REFER to the appropriate EOP and
* CRS directs performance of The timing, order, and SUPPORT Crew requests for EOPs the following EOPs: priority of the EOP IAW with the following.
* CRS directs performance of       The timing, order, and SUPPORT Crew requests for EOPs                 the following EOPs:               priority of the EOP IAW with the following. Validated               =;. EO.ZZ-0320 "Defeating         performance may vary.
Validated  
execution time delays are built-in:                 ARI and RPS Interlocks" EOP-301: ET-8                                   =;. EO.ZZ-0301 "Bypassing EOP-311: ET-9                                       MSIV Isolation Interlocks" EOP-319: ET-10                                 =;. EO.ZZ-0311 "Bypassing EOP-320: ET-11                                     Primary Containment EOP-322: ET-12                                     Instrument Gas Isolation   1 Interlocks" STRATEGIES FOR SUCESSFUL                       =;. EO.ZZ-0319 "Restoring TRANSIENT MITIGATION Instrument Air in an Promptly initiate actions IAW the 300               Emergency" series EOPs to shutdown the reactor.
=;. EO.ZZ-0320 "Defeating performance may vary. execution time delays are built-in:
Timely actions will reduce the potential
ARI and RPS Interlocks" EOP-301: ET-8 =;. EO.ZZ-0301 "Bypassing EOP-311: ET-9 MSIV Isolation Interlocks" EOP-319: ET-10 =;. EO.ZZ-0311 "Bypassing EOP-320: ET-11 Primary Containment EOP-322: ET-12 Instrument Gas Isolation 1 Interlocks" STRATEGIES FOR SUCESSFUL  
                                                =;. EO.ZZ-0322 "Core Spray continued challenges to containment. In             Injection Valve Override" addition, once the post scram hard card actions have been completed and RPV                                           ,,
=;. EO.ZZ-0319 "Restoring TRANSIENT MITIGATION Instrument Air in an Promptly initiate actions IAW the 300 Emergency" series EOPs to shutdown the reactor. EO.ZZ-0322 "Core Spray Timely actions will reduce the potential  
level has stabilized in the required band, an NCO should be assigned the responsibility to insert control rods IAW the post ATWS CRD operation hard card and CRAM move sheets. When control room portions of EOP-320 have been completed and the NCO is ready to re-insert a manual scram, the NCO should perform a crew update and utilize the post scram hard card to implement the applicable post scram actions following the manual scram attempt.
=;. continued challenges to containment.
* CRS directs terminating and preventing injection to the RPV with the exception of:
In Injection Valve Override" addition, once the post scram hard card actions have been completed and RPV level has stabilized in the required band, ,, an NCO should be assigned the responsibility to insert control rods IAW the post ATWS CRD operation hard card and CRAM move sheets. When control room portions of EOP-320 have been completed and the NCO is ready to re-insert a manual scram, the NCO should perform a crew update and utilize the post scram hard card to implement the applicable post scram actions following the manual scram attempt.
                                                =;. SLC
* CRS directs terminating and preventing injection to the RPV with the exception of: =;. SLC =;. CRD =;. RCIC ESG-2016 NRC-1 Page 16 of 28 Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Comments Response
                                                =;. CRD
* RO/PO terminate and prevent injection IAW AB.ZZ-0001:  
                                                =;. RCIC ESG-2016 NRC-1                                 Page 16 of 28                                       Rev. 1
=> Attachment 16 (1 OC651) => Attachment 17 (1 OC650)
 
* CRS directs maintaining RPV The first RHR pump to water level between -50" be started will trip. Refer and -185". to RHR Pump Trip event description on page 19.
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity                                     Comments
* RO/PO control level as directed by CRS with: => Feedwater IAW AB.ZZ-0001 Att. 14 => RCIC IAW AB.ZZ-0001 Att. I 6 => HPCI IAW EOP-322
 
* Crew maintains or restores adequate core cooling by maintaining or restoring RPV level above-185" /AW EOP-101A without ,, Emergency Depressurizing.
===Response===
* RO/PO terminate and prevent injection IAW AB.ZZ-0001:
                                => Attachment 16 (1 OC651)
                                => Attachment 17 (1 OC650)
The first RHR pump to
* CRS directs maintaining RPV be started will trip. Refer water level between -50" and -185".                 to RHR Pump Trip event description on page 19.
* RO/PO control level as directed by CRS with:
                                => Feedwater IAW AB.ZZ-0001 Att. 14
                                => RCIC IAW AB.ZZ-0001 Att.
I 6
                                => HPCI IAW EOP-322
* Crew maintains or restores adequate core cooling by maintaining or restoring RPV level above-185" /AW EOP-101A without
            ,,                 Emergency Depressurizing.
* CRS directs bypassing the RWM and commencing manual rod insertion.
* CRS directs bypassing the RWM and commencing manual rod insertion.
* RO/PO aligns CRD for A TWS operation IAW AB.ZZ-0001 Attachment  
* RO/PO aligns CRD for ATWS operation IAW AB.ZZ-0001 Attachment 18.
: 18.
* RO/PO bypasses RWM and inserts control rods IAW RE-AB.ZZ-0001 Attachment 1.
* RO/PO bypasses RWM and inserts control rods IAW RE-AB.ZZ-0001 Attachment  
ESG-2016 NRC-1                   Page 17 of 28                                   Rev. 1
: 1. ESG-2016 NRC-1 Page 17 of 28 Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Comments Response Total Loss of EHC:
 
* RO/PO recognizes loss of both EHC Pumps and informs Ensure ET-is active following the CRS. trip of SLC Pump 8. The bypass valves will fail shut about 2 minutes later.
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity                                                   Comments
* RO/PO aligns CRD for A TWS operation IAW AB.ZZ-0001 Attachment  
 
: 18.
===Response===
* Crew recognizes turbine bypass valves failing shut by: ==> OHA D3-D5 "EHC UNIT PANEL 1 OC363" ==> DEHC Bypass Valve Positioning Error alarms ==> Reactor pressure rising above Pressure Setpoint STRATEGIES FOR SUCESSFUL
Total Loss of EHC:
* CRS directs stabilizing When pressure control TRANSIENT MITIGATION pressure below 1037 psig swaps to SRVs, Pressure Leg with: maintaining RPV water Direct initial pressure control as Stabilize  
* RO/PO recognizes loss of both EHC Pumps and informs Ensure ET- is active following the             CRS.
==> Main Stearn. Line Drains level between -50" and pressure 800 psig to 1000 psig. The lower SRVs -129" will be very limit of 800 psig will not complicate RPV ==> level maintenance and will prevent an ==> RPFT challenging due to unwanted cooldown.
trip of SLC Pump 8. The bypass valves will fail shut about 2 minutes later.
The upper limit of shrink and swell and 1000 psig is a round number below 1047 changing reactor psig. pressure with the RFPTs in MAN.
* RO/PO aligns CRD for A TWS operation IAW AB.ZZ-0001 Attachment 18.
* RO/PO control pressure as directed by CRS with: ==> Main Steam Line Drains IAW AB.ZZ-0001 Att. 15 ==> SRVs IAW AB.ZZ-0001 Att. 13 ==> RFPTs ESG-2016 NRC-1 Page 18 of 28 Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student Comments Response
* Crew recognizes turbine bypass valves failing shut by:
* Crew recognizes Supp Pool Temp Above 95&deg;F EOP entry condition by: :::;. OHA C8-F1 "SUPPR POOL TEMP HIGH" :::;. Flashing 95 degree status light on 1 OC650C :::;. RM11 9AX833/834 alarm :::;. Various Suppression Pool temperature indicators Strategies For Successful Transient
                                              ==> OHA D3-D5 "EHC UNIT PANEL 1OC363"
* CRS implements EOP-102 . Mitigation Torus Temperature Leg Start all available Torus cooling as soon as possible to remove heat from containment.
                                              ==> DEHC Bypass Valve Positioning Error alarms
* CRS directs placing RHR in I Suppression Pool Cooling.
                                              ==> Reactor pressure rising above Pressure Setpoint STRATEGIES FOR SUCESSFUL TRANSIENT MITIGATION
* RO/PO place RHR in Suppression Pool Cooling IAW AB.ZZ-0001 Att. 2 or 3. TriQ of RHR PumQ:
* CRS directs stabilizing       When pressure control pressure below 1037 psig       swaps to SRVs, Pressure Leg                                   with:                         maintaining RPV water Direct initial pressure control as Stabilize                                 level between -50" and
* RO/PO recognizes RHR RHR Pump will trip after placing it Pump trip. in service, or it starting automatically.
                                              ==> Main Stearn. Line Drains pressure 800 psig to 1000 psig. The lower limit of 800 psig will not complicate RPV     ==> SRVs                      -129" will be very level maintenance and will prevent an         ==> RPFT                       challenging due to unwanted cooldown. The upper limit of                                         shrink and swell and 1000 psig is a round number below 1047                                       changing reactor psig.
pressure with the RFPTs in MAN.
* RO/PO control pressure as directed by CRS with:
                                              ==> Main Steam Line Drains IAW AB.ZZ-0001 Att. 15
                                              ==> SRVs   IAW AB.ZZ-0001 Att. 13
                                              ==> RFPTs ESG-2016 NRC-1                               Page 18 of 28                                   Rev. 1
 
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity                                               Comments
 
===Response===
* Crew recognizes Supp Pool Temp Above 95&deg;F EOP entry condition by:
:::;. OHA C8-F1 "SUPPR POOL TEMP HIGH"
:::;. Flashing 95 degree status light on 1OC650C
:::;. RM11 9AX833/834 alarm
:::;. Various Suppression Pool temperature indicators Strategies For Successful Transient Mitigation
* CRS implements EOP-102 .
Torus Temperature Leg Start all available Torus cooling as soon as possible to remove heat from containment.
* CRS directs placing RHR in                   I Suppression Pool Cooling.
* RO/PO place RHR in Suppression Pool Cooling IAW AB.ZZ-0001 Att. 2 or 3.
TriQ of RHR PumQ:
* RO/PO recognizes RHR Pump trip.
RHR Pump will trip after placing it in service, or it starting automatically.
* CRS directs placing remaining A/B RHR pump in Suppression Pool Cooling.
* CRS directs placing remaining A/B RHR pump in Suppression Pool Cooling.
* RO/PO place remaining A/B RHR pump in Suppression Pool Cooling IAW AB.ZZ-0001 Att. 2 or 3. ESG-2016 NRC-1 Page 19 of 28 Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Comments Response IF dispatched to investigate the trip
* RO/PO place remaining A/B RHR pump in Suppression Pool Cooling IAW AB.ZZ-0001 Att. 2 or 3.
* Crew dispatches operator and of the A/B RHR pump, Maintenance to the tripped THEN REPORT: RHR pump and breaker.
ESG-2016 NRC-1                                 Page 19 of 28                         Rev. 1
 
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity                                       Comments
 
===Response===
IF dispatched to investigate the trip
* Crew dispatches operator and of the A/B RHR pump,                     Maintenance to the tripped THEN REPORT:                             RHR pump and breaker.
* The breaker has target flags dropped on the 51A and 518 Time Overcurrent relays (401/402 bkr 06)
* The breaker has target flags dropped on the 51A and 518 Time Overcurrent relays (401/402 bkr 06)
* The pump motor is hot to the touch and bearing oil levels are normal
* The pump motor is hot to the touch and bearing oil levels are normal
* IF Suppression Pool temperature is >110 degrees, AND Reactor power is >4%, AND SRVs are open or ; cycling, THEN Crew terminates and prevents injection to the RPV with the exception of SLC, CRD, and RCIC, UNTIL Reactor power is <4%, OR RPV level reaches -129", OR SRVs remain closed. * : !E RPV level reaches -129", *THEN RO/PO terminate and prevents injection from Core Spray IAW AB.ZZ-0001 Attachment  
* IF Suppression Pool temperature is >110 degrees, AND Reactor power is >4%,
: 16. WHEN the Crew has reset RPS,
AND SRVs are open or
* WHEN EOP-320 Section 5.1 THEN DELETE Malfunctions RP06 and 5.2 are complete, AND RP07 to allow full rod THEN the Crew implements insertion on the next scram. EOP-320 Section 5.3 and reset RPS. At the Lead Examiners discretion,
                                        ; cycling, THEN Crew terminates and prevents injection to the RPV with the exception of SLC, CRD, and RCIC, UNTIL Reactor power is <4%,
* WHEN OHA C5-B4 clears, MODIFY lnSight Item lclsdv to THEN the Crew initiates a accelerate draining of the SDV. manual scram IAW EOP-320 Section 5.3. ESG-2016 NRC-1 Page 20 of 28 Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Comments Response
OR RPV level reaches -129",
OR SRVs remain closed.
                                      * : !E RPV level reaches -129",
                                        *THEN RO/PO terminate and prevents injection from Core Spray IAW AB.ZZ-0001 Attachment 16.
WHEN the Crew has reset RPS,
* WHEN EOP-320 Section 5.1 THEN DELETE Malfunctions RP06             and 5.2 are complete, AND RP07 to allow full rod               THEN the Crew implements insertion on the next scram.             EOP-320 Section 5.3 and reset RPS.
At the Lead Examiners discretion,
* WHEN OHA C5-B4 clears, MODIFY lnSight Item lclsdv to             THEN the Crew initiates a accelerate draining of the SDV.           manual scram IAW EOP-320 Section 5.3.
ESG-2016 NRC-1                           Page 20 of 28                       Rev. 1
 
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity                                     Comments
 
===Response===
* CREW fully inserts all control rods via RMCS and/or manual scram(s) IAW HC.OP-EO.ZZ-0320.
* CREW fully inserts all control rods via RMCS and/or manual scram(s) IAW HC.OP-EO.ZZ-0320.
* CREW fully inserts all control rods via RMCS and/or manual scram(s) /AW HC.OP-EO.ZZ-0320; OR inserts Cold Shutdown Boron Weight.
* CREW fully inserts all control rods via RMCS and/or manual scram(s) /AW HC.OP-EO.ZZ-0320; OR inserts Cold Shutdown Boron Weight.
* Crew recognizes the reactor is shutdown by: ::::::> SPDS ALL RODS IN I ::::::> RWM Confirm Shutdown ::::::> GRIDS Rod positions
* Crew recognizes the reactor is shutdown by:
::::::> SPDS ALL RODS IN       I
::::::> RWM Confirm Shutdown
::::::> GRIDS Rod positions
* CRS directs terminating SLC injection.
* CRS directs terminating SLC injection.
* RO/PO terminates SLC injection.
* RO/PO terminates SLC injection.
Termination Reguirement:
Termination Reguirement:
* CRS exits EOP-101A, enters The scenario may be terminated at EOP-101. the discretion of the Lead Examiner when:
* CRS exits EOP-101A, enters The scenario may be terminated at     EOP-101.
the discretion of the Lead Examiner when:
* RPV Level is being maintained above-185" AND
* RPV Level is being maintained above-185" AND
* All rods are fully inserted ESG-2016 NRC-1 Page 21 of 28 Rev. 1 SIMULATOR COPY OF ----EXAMINATION SCENARIO GUIDE SCENARIO TITLE: 2016 NRC EXAM SCENARIO SCENARIO NUMBER: ESG-2016NRC-2 EFFECTIVE DATE: Effective When Approved EXPECTED DURATION:
* All rods are fully inserted ESG-2016 NRC-1                       Page 21 of 28                       Rev. 1
60 Minutes REVISION NUMBER: 0 PROGRAM: 0 LICENSED OPERATOR REQUALIFICATION INITIAL LICENSE OOTHER: REVISION  
 
SIMULATOR           COPY - - OF - -
EXAMINATION SCENARIO GUIDE SCENARIO TITLE:           2016 NRC EXAM SCENARIO SCENARIO NUMBER:           ESG-2016NRC-2 EFFECTIVE DATE:           Effective When Approved EXPECTED DURATION:         60 Minutes REVISION NUMBER:           0 PROGRAM:                   0   LICENSED OPERATOR REQUALIFICATION
                          ~ INITIAL LICENSE OOTHER:
REVISION  


==SUMMARY==
==SUMMARY==
:
* Incorporated minor Editorial comments from validation.
* Incorporated minor Editorial comments from validation.
I. OBJECTIVE($):
I. OBJECTIVE($):
Enabling Objectives:
Enabling Objectives:
A. The crew must demonstrate the ability to operate effectively as a team while completing a series of CREW CRITICAL TASKS, which measure the crew's ability to safely operate the plant during normal, abnormal, and emergency plant conditions. (Crew critical tasks within this examination scenario guide are identified with an"*".) II. MAJOR EVENTS: A. Place Remaining Circulating Water Pumps In-Service B. Raise Power with Control Rods C. Flow Unit Failure D. LossofBD481120VAC 1E Inverter E. Steam Leak in the Steam Tunnel-Scram-MSIV Isolation Failure F. LOCA G. Suppression Pool Leak II. SCENARIO  
A. The crew must demonstrate the ability to operate effectively as a team while completing a series of CREW CRITICAL TASKS, which measure the crew's ability to safely operate the plant during normal, abnormal, and emergency plant conditions.
(Crew critical tasks within this examination scenario guide are identified with an"*".)
II. MAJOR EVENTS:
A. Place Remaining Circulating Water Pumps In-Service B. Raise Power with Control Rods C. Flow Unit Failure D. LossofBD481120VAC 1E Inverter E. Steam Leak in the Steam Tunnel-Scram-MSIV Isolation Failure F. LOCA G. Suppression Pool Leak II. SCENARIO  


==SUMMARY==
==SUMMARY==
: A Reactor startup is in progress following a forced outage. Nitrogen Makeup to the Drywell is:* in progress following lnerting the Containment.
A Reactor startup is in progress following a forced outage. Nitrogen Makeup to the Drywell is:*
The crew will place remaining Circulating Water Pumps in-service.
in progress following lnerting the Containment. The crew will place remaining Circulating Water Pumps in-service. Power will then be raised using Control Rods. During rod movement a Recirculation Flow Unit will fail initiating a % Scram and Rod Block. The crew will take action to bypass the failed Flow Unit and reset RPS in order to continue with the startup. A loss of a Class 1E 120VAC Inverter will cause a trip of the running Fuel Pool Cooling System (FPCS) pump and cause a loss of Reactor Building Ventilation. The crew will restore FPCS flow and cooling, and put FRVS in service. A steam leak develops in the Steam Tunnel that requires a scram and closure of the Main Steam Isolation Valves (MS IVs). Manual action will..
Power will then be raised using Control Rods. During rod movement a Recirculation Flow Unit will fail initiating a % Scram and Rod Block. The crew will take action to bypass the failed Flow Unit and reset RPS in order to continue with the startup. A loss of a Class 1 E 120VAC Inverter will cause a trip of the running Fuel Pool Cooling System (FPCS) pump and cause a loss of Reactor Building Ventilation.
be required to ensure isolation of the Main Steam Lines. A small break LOCA will develop during pressure control operations which will raise Drywell Pressure to above the High-High Pressure setpoint. A break develops on the suction line to RHR Pump D when the pump starts. The crew will be required to isolate the leak to maintain Suppression Pool level without Emergency Depressurizing the Reactor.
The crew will restore FPCS flow and cooling, and put FRVS in service. A steam leak develops in the Steam Tunnel that requires a scram and closure of the Main Steam Isolation Valves (MS IVs). Manual action will .. be required to ensure isolation of the Main Steam Lines. A small break LOCA will develop during pressure control operations which will raise Drywell Pressure to above the High-High Pressure setpoint.
ESG-2016NRC-2                               Page 2 of 21                                     Rev. 1
A break develops on the suction line to RHR Pump D when the pump starts. The crew will be required to isolate the leak to maintain Suppression Pool level without Emergency Depressurizing the Reactor. ESG-2016NRC-2 Page 2 of 21 Rev. 1 V. INITIAL CONDITIONS:
l.C. Initial INITIALIZE to IC at approximately 9% power with Reactor Startup in progress.
---INSERT Control Rods (Reverse Pull) to stabilize power at approximately 5%. ---DE-INERT Containment.
---ENSURE HC.OP-IO.ZZ-0003 complete through Step 5.3.38, and 5.3.39A, B, and G. ---ENSURE Containment is inerted, and Drywell makeup is in progress.
---ENSURE TAGS is supplied by SACS A. ---ENSURE HV-2173, CLG TWR BYPASS VALVE is CLOSED. ---ENSURE sufficient Condensate Demineralizers are in service/standby to support startup ---PREP FOR TRAINING (i.e., RM-11 set points, procedures, bezel covers) Initial I MARKUP HC.OP-IO.ZZ-0003;through Step 5.3.38, and 5.3.39A and G; N/A E and F. ------MARKUP HC.OP-SO.DA-0001 through Step 5.1.31. MARKUP HC.OP-SO.AC-0001 through Step 5.2.7.R.5.
---MARKUP HC.OP-SO.CG-0001 through Step 5.9.3 [5.9.2 is N/A]; and Att 3 to 1.4.D for ---degraded vacuum. ---MARKUP HC.OP-SO.GS-0001 through Step 5.2.10. ---MARKUP Rod Pull List to Step 359, Rod 42-43@ 06. ENSURE REMA available for Startup ---At a minimum review the Scenario Reference section and CLEAN the balded EOPs, ABs ---and SOPs listed. (80091396 0270) ---COMPLETE "Simulator Ready-for-Training/Examination Checklist".
EVENT FILE: Initial Event 6 Event Code: rh_bkr(4)


==
V.      INITIAL CONDITIONS:
Description:==
l.C.
Initial
- - - INITIALIZE to IC at approximately 9% power with Reactor Startup in progress.
INSERT Control Rods (Reverse Pull) to stabilize power at approximately 5%.
- - - DE-INERT Containment.
- - - ENSURE HC.OP-IO.ZZ-0003 complete through Step 5.3.38, and 5.3.39A, B, and G.
ENSURE Containment is inerted, and Drywell makeup is in progress.
ENSURE TAGS is supplied by SACS A.
- - - ENSURE HV-2173, CLG TWR BYPASS VALVE is CLOSED.
- - - ENSURE sufficient Condensate Demineralizers are in service/standby to support startup PREP FOR TRAINING (i.e., RM-11 set points, procedures, bezel covers)
Initial  I
- - - MARKUP HC.OP-IO.ZZ-0003;through Step 5.3.38, and 5.3.39A and G; N/A E and F.
MARKUP HC.OP-SO.DA-0001 through Step 5.1.31.
- - - MARKUP HC.OP-SO.AC-0001 through Step 5.2.7.R.5.
MARKUP HC.OP-SO.CG-0001 through Step 5.9.3 [5.9.2 is N/A]; and Att 3 to 1.4.D for
---          degraded  vacuum.
- - - MARKUP HC.OP-SO.GS-0001 through Step 5.2.10.
MARKUP Rod Pull List to Step 359, Rod 42-43@ 06.
ENSURE REMA available for Startup At a minimum review the Scenario Reference section and CLEAN the balded EOPs, ABs and SOPs listed. (80091396 0270)
- - - COMPLETE "Simulator Ready-for-Training/Examination Checklist".
EVENT FILE:
Initial    Event Event Code: rh_bkr(4) 6


RHR Pump D Start 7 Event Code: rhv004(4)  
== Description:==
<= 0
RHR Pump D Start Event Code: rhv004(4) <= 0 7


== Description:==
== Description:==
HV-F004D Closed ESG-2016NRC-2                                  Page 3 of 21                              Rev. 1
MALFUNCTION SCHEDULE:
Initial @Time  Event                    Action                              Description None  None Insert malfunction NM12D to 0 on event 1  Flow summer K607D failure Loss of 120 VAC class 1 E inst bus None  None Insert malfunction ED09B1 on event 2 1BD481 Insert malfunction MS04B to 80.00000 in None  None                                          Steam line B leak in tunnel 180 on event 3 None  None Insert malfunction MS19B                  MSIV F022B fail to auto isolation None  None Insert malfunction MS20B                  MSIV F028B fail to auto isolation Insert malfunction RR31A1 to 40.00000 in  Recirc loop A small break [V] (10%-60 None  None 300 on event 4                            gpm, 100%-600 gpm)
Insert malfunction RH07D after 5 on event None  None                                          RHR Leak via Pump Suction, Loop D 6
Insert malfunction PC06 to 2.00000 on None  None                                          Suppression pool break event 6 Insert malfunction PC06 to 0 on event 7 None  None                                          Suppression pool break delete in 1 None  None Insert malfunction HP06E                  HPCI aux oil pump failure to auto start REMOTE SCHEDULE:
Initial <@Time Event                    Action                              Description None  None Insert remote HV011 to STOP on event 3    HV011 Steam tunnel unit cooler AVH216 None  None Insert remote HV006 to STOP on event 9    HV006 RBVS Supply fan C None  None Insert remote HV005 to STOP on event 9    HV005 RBVS Supply fan B None  None Insert remote HV004 to STOP on event 9    HV004 RBVS Supply fan A Insert remote HV003 after 5 to STOP on None  None                                          HV003 RBVS Exhaust fan C event 9 Insert remote HV002 after 6 to STOP on None  None                                          HV002 RBVS Exhaust fan B event 9
                                                                                        \
Insert remote HV001 after 7 to STOP on None  None                                          HV001 RBVS Exhaust fan A event9 ESG-2016NRC-2                            Page 4 of 21                                            Rev. 1
OVERRIDE SCHEDULE:
Initial @Time Event    Action        Descriotion ESG-2016NRC-2          Page 5 of 21            Rev. 1
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity                                Comments
===Response===
PLACE REMAINING CIRCULATING WATER PUMPS
* CRS directs placing remaining Circulating Water Pumps in-IN-SERVICE                      service IAW HC.OP-SO.DA-0001.
* PO places remaining Circulating Water Pumps in-service IAW HC.OP-SO.DA-0001:
INSERT Remote AN-06 to NORM
                                  => OBSERVE CIRCULATING WATER PUMP STR ENBL when necessary to acknowledge is illuminated local alarm on pump start.
                                  =>  PRESS Pump START push-button.
                                  => OBSERVE DISCH VAL VE OPEN/CLOSE MID      I illuminates
                                  =>  PRESS Pump START push-button.
                                  =>  OBSERVE DISCH VALVE OPEN/CLOSE MID illuminates
                                  =>  PRESS DISCH VAL VE HV-2152A(B,C,D) OPEN FULL push-buttons to open fully each valve.
RAISE POWER WITH CONTROL RODS
* CRS directs power ascension IAW 10-3 and REMA.
* CRS directs withdrawing control rods IAW REMA guidance.
I ESG-2016NRC-2                    Page 6 of 21                        Rev.1
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity                                    Comments
===Response===
* RO withdraws control rods IAW REMA guidance and HC.OP-SO.SF-0001.
                                    => Presses the desired Control Rod Select PB
                                    => Momentarily presses the WITHDRAW PB
                                    => After the withdrawal cycle is completed, ENSURE that the rod position indicates that the rod is in the correct, even numbered position.
                                    => Initials Rod Pull Sheet Flow summer K607D failure:
* Crew monitors Reactor power, After the Crew raises power,      pressure, and level and OR,                                ensure plant conditions are at the discretion of the Lead      stable.
Examiner, TRIGGER ET-1.
        ,,
* Crew recognizes K607D failure Downscale by:
                                    =>  [C6-D1] "APRM/RBM FLOW REF OFF NORMAL".
                                    =>  Flow  Units C & D "COMPAR" status lights.
                                    => CRIDS C049 "RECIRC FLOW COMPAR".
If panels are opened, state that indications on 1OC608 indicate
* RO refers to HC.OP-AR.ZZ-0020, CRIDS C049:
K607D meter is downscale.          => CHECK flow unit readings AND under the direction of Flow Unit D COM PARATOR and            the SM/CRS BYPASS the Flow Unit C Comparator lights on      unit having an off normal 1OC608 should be illuminated.          reading.
ESG-2016NRC-2                        Page 7 of 21                          Rev. 1
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity                                          Comments
===Response===
* Crew enters OP-AB.IC-0004
                                          => Condition F
                                              => Crew bypasses the affected Flow Unit.
                                              => Crew refers to DD.ZZ-0020 for a failed PPG Sensor.
                                              => Crew directs Reactor Engineering to evaluate the flow unit failure on the PPG.
NOTE:                                        => Crew directs l&C to PLACE the MODE WHEN directed by the crew to                Switch, on the D flow place the flow unit mode switch to          u~it, to the the "unlabeled" position, THEN              "UNLABELED" position MODIFY NM120 to 100%.                      between STANDBY and ZERO.
                                              => Crew verifies RPS Trip clear.
If panels are opened, state that indications on 1OC608 indicate
* PO may check indications on 1OC608 and reports K607D is K607D is INOP.                          now BYPASSED.
* Crew contacts Maintenance to troubleshoot K607D failure.
* Crew contacts Operations Management.
* CRS enters Tracking LCOs for Tech Spec 3.3.6 [since Mode 2], and may enter a Tracking LCO for 3.1.4.3 [since Mode 2].
ESG-2016NRC-2                              Page 8 of 21                          Rev. 1
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity                                            Comments
* Response LOSS OF BD481120 VAC 1E INVERTER
* Crew identifies the loss of BD481 by:
                                    ~    OHA D3-E3 120VAC UPS AFTER actions are completed for TROUBLE the stuck control rod, OR at the
                                    ~    GRIDS Page 167 discretion of the Lead Examiner, TRIGGER ET-2.                      ~    GRIDS D4971 in alarm
* CRS enters AB.ZZ-0136 and Note: M/U to the drywell directs actions IAW will isolate on the AB.ZZ-0136:
inverter loss. RCIC is
                                    ~ Assess all plant systems inoperable due to no and enter appropriate power to the Flow Abnormal Procedures Controller.
                                    ~ Determine failed inverter
* CRS implements AB.COOL-                            I 0004 for the loss of FPC Flow:
                                    ~    Condition I
* PO restores Fuel Pool Cooling System flow IAW AB.COOL-0004 by restarting at least one Fuel Pool Cooling Pump as follows:                                            ,,
                                    ~    Ensures Skimmer Surge Tank> 22".
                                    ~    Opens 1-EC-HV-4689A(B),
FILTER DEMIN BYPASS VALVE.
                                    ~    Closes 1-EC-HV-4689B(A),
FILTER DEMIN BYPASS VALVE.
                                    ~    Closes either 1-EC-HV-4676A OR 1-EC-HV-4676B, F/D INL ISLN.
                                    ~  Starts one Fuel Pool Cooling Pump A(B)P211.
* CRS implements AB.COMP-0002 for the Inadvertent B Channel Isolation.:
                                    ~  Condition E ESG-2016NRC-2                      Page 9 of 21                                      Rev. 1
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity                                    Comments


HV-F004D Closed ESG-2016NRC-2 Page 3 of 21 Rev. 1 MALFUNCTION SCHEDULE:
===Response===
Initial @Time Event Action Description None None Insert malfunction NM12D to 0 on event 1 Flow summer K607D failure None None Insert malfunction ED09B1 on event 2 Loss of 120 VAC class 1 E inst bus 1 BD481 None None Insert malfunction MS04B to 80.00000 in Steam line B leak in tunnel 180 on event 3 None None Insert malfunction MS19B MSIV F022B fail to auto isolation None None Insert malfunction MS20B MSIV F028B fail to auto isolation None None Insert malfunction RR31A1 to 40.00000 in Recirc loop A small break [V] (10%-60 300 on event 4 gpm, 100%-600 gpm) None None Insert malfunction RH07D after 5 on event RHR Leak via Pump Suction, Loop D 6 None None Insert malfunction PC06 to 2.00000 on Suppression pool break event 6 None None Insert malfunction PC06 to 0 on event 7 Suppression pool break delete in 1 ' None None Insert malfunction HP06E HPCI aux oil pump failure to auto start REMOTE SCHEDULE:
* PO ensures Isolations per Attachment 5 for B Channel.
Initial <@Time Event Action Description None None Insert remote HV011 to STOP on event 3 HV011 Steam tunnel unit cooler AVH216 None None Insert remote HV006 to STOP on event 9 HV006 RBVS Supply fan C None None Insert remote HV005 to STOP on event 9 HV005 RBVS Supply fan B None None Insert remote HV004 to STOP on event 9 HV004 RBVS Supply fan A None None Insert remote HV003 after 5 to STOP on HV003 RBVS Exhaust fan C event 9 None None Insert remote HV002 after 6 to STOP on HV002 RBVS Exhaust fan B event 9 Insert remote HV001 after 7 to STOP on \ None None event9 HV001 RBVS Exhaust fan A ESG-2016NRC-2 Page 4 of 21 Rev. 1 OVERRIDE SCHEDULE:
                                      => KL-HV5126B
Initial @Time Event Action Descriotion ESG-2016NRC-2 Page 5 of 21 Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity PLACE REMAINING
                                      => KL-HV5172B
* CIRCULATING WATER PUMPS IN-SERVICE
* Crew recognizes Loss of RBVS by:
* INSERT Remote AN-06 to NORM when necessary to acknowledge local alarm on pump start. RAISE POWER WITH CONTROL
                                      => RB D/P indication on 10C650E
* RODS
                                      => SPDS RB PARAMETERS D/P indication.
* I ESG-2016NRC-2 Expected Plant/Student Response CRS directs placing remaining Circulating Water Pumps in-service IAW HC.OP-SO.DA-0001. PO places remaining Circulating Water Pumps in-service IAW HC.OP-SO.DA-0001: => OBSERVE CIRCULATING WATER PUMP STR ENBL is illuminated
                                      => OHA   E1-F5 "COMPUTER PT IN ALARM"
=> PRESS Pump START push-button.
                                      => GRIDS   B7164 "REACTOR BLDG DIFF PRESS"
=> OBSERVE DISCH VAL VE OPEN/CLOSE MID I illuminates
                                      => OHA E6-C5 "RBVS &
=> PRESS Pump START push-button.
WING AREA HVAC PNL 10C382"
=> OBSERVE DISCH VALVE OPEN/CLOSE MID illuminates
                                      => GRIDS D3960 "RBVS EXH RMT PNL C382 TRBL"
=> PRESS DISCH VAL VE HV-2152A(B,C,D)
                                      => GRIDS D3961 "RBVS SUPPLY RMT PNL C382 TRBL"
OPEN FULL push-buttons to open fully each valve. CRS directs power ascension IAW 10-3 and REMA. CRS directs withdrawing control rods IAW REMA guidance.
* CRS implements AB.CONT-003:
Page 6 of 21 Comments Rev.1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity
                                      => Condition A
* Flow summer K607D failure:
                                      => Condition D
* After the Crew raises power, OR, at the discretion of the Lead Examiner, TRIGGER ET-1. * ,, If panels are opened, state that
* CRS recognize the following Tech Specs actions apply for the loss of Secondary Containment Integrity.
* indications on 1 OC608 indicate K607D meter is downscale.
                                      => 3.6.5.1, IF unable to draw down the secondary containment to greater than or equal to 0.25" vac wg IF directed to secure RBVS,
Flow Unit D COM PARA TOR and Flow Unit C Comparator lights on 1 OC608 should be illuminated.
* RO/PO places FRVS in THEN TRIGGER ET-9.                  service IAW SO.GU-0001, or AB.ZZ-0001 Attachment 20.
ESG-2016NRC-2 Expected Plant/Student Response RO withdraws control rods IAW REMA guidance and HC.OP-SO.SF-0001.
ESG-2016NRC-2                        Page 10 of 21                         Rev. 1
=> Presses the desired Control Rod Select PB => Momentarily presses the WITHDRAW PB => After the withdrawal cycle is completed, ENSURE that the rod position indicates that the rod is in the correct, even numbered position.
 
=> Initials Rod Pull Sheet Crew monitors Reactor power, pressure, and level and ensure plant conditions are stable. Crew recognizes K607D failure Downscale by: => [C6-D1] "APRM/RBM FLOW REF OFF NORMAL". => Flow Units C & D "COMPAR" status lights. => CRIDS C049 "RECIRC FLOW COMPAR". RO refers to HC.OP-AR.ZZ-0020, CRIDS C049: => CHECK flow unit readings AND under the direction of the SM/CRS BYPASS the unit having an off normal reading. Page 7 of 21 Comments Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity                                         Comments
* NOTE: WHEN directed by the crew to place the flow unit mode switch to the "unlabeled" position, THEN MODIFY NM120 to 100%. If panels are opened, state that
 
* indications on 1 OC608 indicate K607D is INOP. * *
===Response===
* ESG-2016NRC-2 Expected Plant/Student Response Crew enters OP-AB.IC-0004
If sent to investigate Inverter problem, report Blown Main Fuse
=> Condition F => Crew bypasses the affected Flow Unit. => Crew refers to DD.ZZ-0020 for a failed PPG Sensor. => Crew directs Reactor Engineering to evaluate the flow unit failure on the PPG. => Crew directs l&C to PLACE the MODE Switch, on the D flow to the "UNLABELED" position between STANDBY and ZERO. => Crew verifies RPS Trip clear. PO may check indications on 1 OC608 and reports K607D is now BYPASSED.
* CRS recognize the following 8 hours to reenergize Tech Specs actions apply for panel and restore indicated on the Inverter Section. the loss of BD481:           inverter within 24 hours,
Crew contacts Maintenance to troubleshoot K607D failure. Crew contacts Operations Management.
                                      => Distribution - Operating or Hot SD in 12 hours 3.8.3.1 action a AND d   and Cold SD in following 24.
CRS enters Tracking LCOs for Tech Spec 3.3.6 [since Mode 2], and may enter a Tracking LCO for 3.1.4.3 [since Mode 2]. Page 8 of 21 Comments Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student
STEAM LEAK IN THE STEAM TUNNEL-SCRAM
* Response Comments LOSS OF BD481120 VAC 1E
* Crew recognizes rising temperature in the Steam Tunnel by:
* Crew identifies the loss of INVERTER BD481 by: AFTER actions are completed for OHA D3-E3 120VAC UPS the stuck control rod, OR at the TROUBLE discretion of the Lead Examiner, GRIDS Page 167 TRIGGER ET-2. GRIDS D4971 in alarm
AFTER FPCCU System flow has
* CRS enters AB.ZZ-0136 and directs actions IAW Note: M/U to the drywell AB.ZZ-0136:
. been restored, OR at the
will isolate on the Assess all plant systems inverter loss. RCIC is inoperable due to no and enter appropriate power to the Flow Abnormal Procedures Controller. Determine failed inverter
                                      => CRIDS A2541 "ST TUNNEL 10 VH216 INLET discretion of the Lead Examiner, AIR" TRIGGER ET-3.
* CRS implements AB.COOL-I 0004 for the loss of FPC Flow: Condition I
                                      => OHA D3-A3 "MN STM/RWCU AREA LEAK TEMP HI"
* PO restores Fuel Pool Cooling System flow IAW AB.COOL-0004 by restarting at least one Fuel Pool Cooling Pump as follows: ,, Ensures Skimmer Surge Tank> 22". Opens 1-EC-HV-4689A(B), FILTER DEMIN BYPASS VALVE. Closes 1-EC-HV-4689B(A), FILTER DEMIN BYPASS VALVE. Closes either 1-EC-HV-4676A OR 1-EC-HV-4676B, F/D INL ISLN. Starts one Fuel Pool Cooling Pump A(B)P211.
                                      => CRI DS D5866 "RWCU/MAIN ST LEAK DETTMPCHW" IF dispatched to check the status of Steam Tunnel Unit Coolers,
* CRS implements AB.COMP-0002 for the Inadvertent B Channel Isolation.: Condition E ESG-2016NRC-2 Page 9 of 21 Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity * * ' ,, *
* CRS implements AB.BOP 0005:
* IF directed to secure RBVS,
THEN REPORT both Steam                                              ..
* THEN TRIGGER ET-9. ESG-2016NRC-2 Expected Plant/Student Response PO ensures Isolations per Attachment 5 for B Channel. => KL-HV5126B  
Tunnel Unit Coolers are in service
=> KL-HV5172B Crew recognizes Loss of RBVS by: => RB D/P indication on 10C650E => SPDS RB PARAMETERS D/P indication.  
                                      => Condition A (Do NOT actually place the coolers in service).
=> OHA E1-F5 "COMPUTER PT IN ALARM" => GRIDS B7164 "REACTOR BLDG DIFF PRESS" => OHA E6-C5 "RBVS & WING AREA HVAC PNL 10C382" => GRIDS D3960 "RBVS EXH RMT PNL C382 TRBL" => GRIDS D3961 "RBVS SUPPLY RMT PNL C382 TRBL" CRS implements AB.CONT-003:  
At the Lead Examiners discretion, RAISE Steam Tunnel
=> Condition A => Condition D CRS recognize the following Tech Specs actions apply for the loss of Secondary Containment Integrity.  
* WHEN the Crew determines Steam Tunnel temperature temperature to 165 degrees in 2      cannot be maintained below degree increments using Insight      145 degrees THEN CRS Item mstunl.                        DIRECTS:
=> 3.6.5.1, IF unable to draw down the secondary containment to greater than or equal to 0.25" vac wg RO/PO places FRVS in service IAW SO.GU-0001, or AB.ZZ-0001 Attachment  
                                      => Lock the Mode Switch in Shutdown ESG-2016NRC-2                        Page 11 of 21                                 Rev. 1
: 20. Page 10 of 21 Comments Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity If sent to investigate Inverter
 
* problem, report Blown Main Fuse indicated on the Inverter Section. STEAM LEAK IN THE STEAM
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity                                         Comments
* TUNNEL-SCRAM AFTER FPCCU System flow has . been restored, OR at the discretion of the Lead Examiner, TRIGGER ET-3. IF dispatched to check the status
 
* of Steam Tunnel Unit Coolers, THEN REPORT both Steam Tunnel Unit Coolers are in service (Do NOT actually place the coolers in service).
===Response===
At the Lead Examiners discretion,
STRATEGIES FOR SUCESSFUL TRANSIENT MITIGATION
* RAISE Steam Tunnel temperature to 165 degrees in 2 degree increments using Insight Item mstunl. ESG-2016NRC-2 Expected Plant/Student Response CRS recognize the following Tech Specs actions apply for the loss of BD481: => Distribution  
* RO observes Recirc pump speeds at minimum and locks Reactor Scram Reports               the Mode Switch in Following a Reactor scram, the     SHUTDOWN and performs NCO should make an initial scram   scram actions IAW AB.ZZ-report by announcing reactor       0001 Att. 1.
-Operating 3.8.3.1 action a AND d Crew recognizes rising temperature in the Steam Tunnel by: => CRIDS A2541 "ST TUNNEL 10 VH216 INLET AIR" => OHA D3-A3 "MN STM/RWCU AREA LEAK TEMP HI" => CRI DS D5866 "RWCU/MAIN ST LEAK DETTMPCHW" CRS implements AB.BOP 0005: => Condition A WHEN the Crew determines Steam Tunnel temperature cannot be maintained below 145 degrees THEN CRS DIRECTS: => Lock the Mode Switch in Shutdown Page 11 of 21 Comments 8 hours to reenergize panel and restore inverter within 24 hours, or Hot SD in 12 hours and Cold SD in following
status IAW HC.OP-AB.ZZ-0001.
: 24. ' .. Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity STRATEGIES FOR SUCESSFUL TRANSIENT MITIGATION Reactor Scram Reports Following a Reactor scram, the NCO should make an initial scram report by announcing reactor status IAW HC.OP-AB.ZZ-0001.
Crew personnel should hold all other non-essential communications until after the initial scram report is complete.
Crew personnel should hold all other non-essential communications until after the initial scram report is complete.
The Control Room Supervisor should silence alarms during the scram report and the SM/CRS is not required to make a statement directing the NCO to check the overhead alarms, since these actions are already expected immediately following the scram. During the scram report, the NCO should report reactor level and pressure and their trends to the Control Room staff IAW HC.OPAB.ZZ-0001.
The Control Room Supervisor should silence alarms during the scram report and the SM/CRS is not required to make a statement directing the NCO to check the overhead alarms, since these actions are already expected immediately following the scram.
MSIV ISOLATION FAILURE MSIV isolation failure is pre-inserted.
During the scram report, the NCO should report reactor level and pressure and their trends to the Control Room staff IAW HC.OPAB.ZZ-0001.
ESG-2016NRC-2
* CRS implements AB-000 .
* * * *
* CRS may direct placing FRVS in service.
* Expected Plant/Student Response RO observes Recirc pump speeds at minimum and locks the Mode Switch in SHUTDOWN and performs scram actions IAW AB.ZZ-0001 Att. 1. CRS implements AB-000 . CRS may direct placing FRVS in service. Crew recognizes isolation signal has been generated by: OHAsC8-A14,NSSSS MSIV LOGIC A(B,C,D) INITIATED OHA C8-C4, NSSSS ISLN SIG-STM TNL TEMP HI RO recognizes all MSIVs are NOT closed, closes at least one valve in the failed line, and informs CRS. Page 12 of 21 Comments Crew may isolate the MSLs before isolation signal is received.
MSIV ISOLATION FAILURE
Immediate Operator Actions AB-CONT-0002. Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity LOCA AFTER the MSIVs have been closed, OR at the discretion of the Lead Examiner, TRIGGER ET-4. ESG-2016NRC-2 Expected Plant/Student Response *Crew prevents an uncontrolled leak of steam outside of secondary containment by closing at least one MSIV in each Main Steam Line.
* Crew recognizes isolation signal has been generated by:
* Crew recognizes LOCA condition:  
MSIV isolation failure is pre-
=> OHA C6 81 "OLD SYSTEM ALARM/TRBL" => RM11 9AX314 OLD FLOOR ORN FLOW alarm => Rising Drywell Pressure
                                    ~ OHAsC8-A14,NSSSS           Crew may isolate the inserted.
* CRS implements AB.CONT-001: => Condition A
MSIV LOGIC A(B,C,D)       MSLs before isolation INITIATED                 signal is received.
                                    ~ OHA C8-C4, NSSSS ISLN SIG-STM TNL TEMP HI
* RO recognizes all MSIVs are Immediate Operator NOT closed, closes at least Actions AB-CONT-one valve in the failed line, 0002.
and informs CRS.
ESG-2016NRC-2                        Page 12 of 21                                   Rev. 1
 
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity                                     Comments
 
===Response===
                                    *Crew prevents an uncontrolled leak of steam outside of secondary containment by closing at least one MSIV in each Main Steam Line.
LOCA
* Crew recognizes LOCA condition:
AFTER the MSIVs have been closed, OR at the discretion of the
                                        => OHA C6 81 "OLD SYSTEM ALARM/TRBL" Lead Examiner, TRIGGER ET-4.
                                        => RM11 9AX314 OLD FLOOR ORN FLOW alarm
                                        => Rising Drywell Pressure
* CRS implements AB.CONT-001:
                                        => Condition A
* RO/PO ensures drywell cooling maximized.
* RO/PO ensures drywell cooling maximized.
* Crew checks => Recirc pump seal parameters  
* Crew checks
=> SRV temperatures
                                        => Recirc pump seal parameters
* Crew recognizes High Drywell Pressure EOP-101 and 102 entry condition:  
                                        => SRV temperatures
=> OHA A 7-04 "DRYWELL PRESSURE HI/HI" => OHA C5-B5 "DRYWELL PRESSURE HI" => Various system initiations and isolations Page 13 of 21 Comments Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity * *
* Crew recognizes High Drywell Pressure EOP-101 and 102 entry condition:
* I SUPPRESSION POOL LEAK
                                        => OHA A 7-04 "DRYWELL PRESSURE HI/HI"
* ENSURE ET-6 activates when RHR D pump starts. * ,,
                                        => OHA C5-B5 "DRYWELL PRESSURE HI"
* NOTE: Entry into EOP-103 may
                                        => Various system initiations and isolations ESG-2016NRC-2                          Page 13 of 21                         Rev. 1
* not be made until reports of high water levels or Room Flood Alarm is received.
 
ESG-2016NRC-2 Expected Plant/Student Response Crew recognizes High Drywell Temperature EOP-102 entry condition:  
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity                                   Comments
=> CRIDS 85070 SPDS DRYWELL AVG TEMP in alarm. CRS enters EOP-102, and EOP-101. Crew recognizes LOCA Sequencer failure and starts/imitates various system initiations and isolations as necessary Crew recognizes lowering torus water level. Crew recognizes Supp Pool Level Below 7 4.5 In EOP entry condition by: => OHA B1-C3 "SUPPRESSION POOL LEVEL HI/LO" => Various Suppression Pool level indicators CRS re-enters EOP-102 . CRS implements EOP 103/104. Page 14 of 21 Comments Rev. 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity IF dispatched to 'D' RHR pump room, THEN REPORT there is about three inches of water on the floor. Water is coming from a cracked weld on an elbow of the 'D' RHR pump suction line. Expected Plant/Student Response
 
* Crew dispatches NEO and Maintenance to 'D' RHR pump room. IF directed to place the DP202
===Response===
* RO/PO close 'D' RHR suction RHR pump breaker in PTL, valve. THEN INSERT REMOTE ET109T TO TAGGED. IF directed to implement EOP-315, THEN REPORT operators will be briefed and sent into the field. Do NOT open makeup valves until after leak is isolated.
* Crew recognizes High Drywell Temperature EOP-102 entry condition:
                                    => CRIDS 85070 SPDS DRYWELL AVG TEMP in alarm.
* CRS enters EOP-102, and EOP-101.
* Crew recognizes LOCA Sequencer failure and starts/imitates various system initiations and isolations as necessary I
SUPPRESSION POOL LEAK
* Crew recognizes lowering torus water level.
ENSURE ET-6 activates when RHR D pump starts.
* Crew recognizes Supp Pool
  ,,                                Level Below 74.5 In EOP entry condition by:
                                    => OHA B1-C3 "SUPPRESSION POOL LEVEL HI/LO"
                                    => Various Suppression Pool level indicators
* CRS re-enters EOP-102 .
NOTE: Entry into EOP-103 may not be made until reports of high
* CRS implements EOP 103/104.
water levels or Room Flood Alarm is received.
ESG-2016NRC-2                        Page 14 of 21                         Rev. 1
 
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity                                     Comments
 
===Response===
IF dispatched to 'D' RHR pump
* Crew dispatches NEO and room,                                 Maintenance to 'D' RHR pump THEN REPORT there is about             room.
three inches of water on the floor.
Water is coming from a cracked weld on an elbow of the 'D' RHR pump suction line.
IF directed to place the DP202
* RO/PO close 'D' RHR suction RHR pump breaker in PTL,               valve.
THEN INSERT REMOTE ET109T TO TAGGED.
                                    *Crew isolates Suppression Pool leak and prevents a required Emergency Depressurization.
IF directed to implement
* RO/PO coordinates EOP-315,                               implementation of EOP-315 THEN REPORT operators will be         with NEO.
briefed and sent into the field.
Do NOT open makeup valves until after leak is isolated.
TERMINATION REQUIREMENT:
TERMINATION REQUIREMENT:
The scenario should be terminated at the discretion of the Lead Examiner when:
The scenario should be terminated at the discretion of the Lead Examiner when:
* RPV Level and Pressure Control is established and
* RPV Level and Pressure Control is established and
* The RHR leak has been isolated.
* The RHR leak has been isolated.
ESG-2016NRC-2  
ESG-2016NRC-2                           Page 15 of 21                       Rev. 1
*Crew isolates Suppression Pool leak and prevents a required Emergency Depressurization.
 
* RO/PO coordinates implementation of EOP-315 with NEO. Page 15 of 21 Comments Rev. 1 SCENARIO TITLE: SCENARIO NUMBER: EFFECTIVE DATE: EXPECTED DURATION:
COPY - - OF - -
REVISION NUMBER: PROGRAM: REVISION  
SIMULATOR EXAMINATION SCENARIO GUIDE SCENARIO TITLE:                   PCIG Leak/Loss of 10A110/Loss of Feedwater/HPCI Trip/LOCA SCENARIO NUMBER:                   ESG-2016 NRC-3 EFFECTIVE DATE:                   Effective When Approved EXPECTED DURATION:                 1.0 Hour REVISION NUMBER:                   1 PROGRAM:                             x    I LO. REQUAL X    I INITIAL LICENSE
                                .____ __.I OTHER REVISION  


==SUMMARY==
==SUMMARY==
: SIMULATOR EXAMINATION SCENARIO GUIDE COPY OF ----PCIG Leak/Loss of 10A110/Loss of Feedwater/HPCI Trip/LOCA ESG-2016 NRC-3 Effective When Approved 1.0 Hour 1 x I LO. REQUAL X I INITIAL LICENSE .___ _ __.I OTHER 1. Incorporated Editorial comments from validation.
: 1. Incorporated Editorial comments from validation.
 
I. OBJECTIVE(S):
I. OBJECTIVE(S):
Enabling Objectives A. The crew must demonstrate the ability to operate effectively as a team while completing a series of CREW CRITICAL TASKS, which measure the crew's ability to safely operate the plant during normal, abnormal, and emergency plant conditions. (Crew critical tasks within this examination scenario guide are identified with an "*.") II. MAJOR EVENTS: A. Recirculation Pump Runaway B. Primary Containment Instrument Gas Leak C. Loss of 10A110 D. Loss of Feedwater with Automatic Scram Failure E. Trip of HPCI F. LOCA G. Failure of 'A' Channel Core Spray and RHR Logics Ill. SCENARIO  
Enabling Objectives A. The crew must demonstrate the ability to operate effectively as a team while completing a series of CREW CRITICAL TASKS, which measure the crew's ability to safely operate the plant during normal, abnormal, and emergency plant conditions.
(Crew critical tasks within this examination scenario guide are identified with an "*.")
II. MAJOR EVENTS:
A. Recirculation Pump Runaway B. Primary Containment Instrument Gas Leak C. Loss of 10A110 D. Loss of Feedwater with Automatic Scram Failure E. Trip of HPCI F. LOCA G. Failure of 'A' Channel Core Spray and RHR Logics Ill. SCENARIO  


==SUMMARY==
==SUMMARY==
: The scenario begins with the plant at 95% power with power ascension in progress.
The scenario begins with the plant at 95% power with power ascension in progress. A Recirculation Pump runaway will occur during power ascension. The crew will need to lower power to less than the license maximum power level. After actions have been taken' for the power excursion a Primary Containment Instrument Gas Leak will develop and require the crew to isolate a portion of the PCIG System to stop the leak. After the leak has been isolated, the 1OA110 7 .2 KV bus is lost. The plant stabilizes in the OPRM Enable Region and power will rise to Region 1 due to the loss of Feedwater heating from the load reduction. The Crew must insert control rods to maintain the plant outside of Region 1. After exiting Region 1, 'C' PCP and all SCPs trip causing a complete loss of Feedwater. RPS fails to actuate on LVL 3 or the Mode Switch, and RPS or ARI must be manually initiated to shutdown the Reactor. Shortly after the reactor is scrammed, HPCI will trip due to a failed turbine exhaust pressure transmitter. A LOCA will occur which will be beyond the capacity of available high pressure injection. The 'A' Channels of Core Spray and RHR will fail to automatically initiate, but can be manually initiated.
A Recirculation Pump runaway will occur during power ascension.
The Crew must Emergency Depressurize and restore level with low pressure ECCS.
The crew will need to lower power to less than the license maximum power level. After actions have been taken' for the power excursion a Primary Containment Instrument Gas Leak will develop and require the crew to isolate a portion of the PCIG System to stop the leak. After the leak has been isolated, the 1OA110 7 .2 KV bus is lost. The plant stabilizes in the OPRM Enable Region and power will rise to Region 1 due to the loss of Feedwater heating from the load reduction.
ESG-2016 NRC-3                                 Page 2 of 28                                     Rev.: 1
The Crew must insert control rods to maintain the plant outside of Region 1. After exiting Region 1, 'C' PCP and all SCPs trip causing a complete loss of Feedwater.
 
RPS fails to actuate on L VL 3 or the Mode Switch, and RPS or ARI must be manually initiated to shutdown the Reactor. Shortly after the reactor is scrammed, HPCI will trip due to a failed turbine exhaust pressure transmitter.
IV.       INITIAL CONDITIONS:
A LOCA will occur which will be beyond the capacity of available high pressure injection.
l.C.
The 'A' Channels of Core Spray and RHR will fail to automatically initiate, but can be manually initiated.
Initial INITIALIZE the simulator to 100% power, MOL, TACS on SACS Loop A ENSURE 'D' SACS pump is in service and 'B' SACS pump in STBY.
The Crew must Emergency Depressurize and restore level with low pressure ECCS. ESG-2016 NRC-3 Page 2 of 28 Rev.: 1 IV. INITIAL CONDITIONS:
- - - LOWER power to 95% with Recirculation Pumps.
l.C. Initial ---INITIALIZE the simulator to 100% power, MOL, TACS on SACS Loop A ---ENSURE 'D' SACS pump is in service and 'B' SACS pump in STBY. LOWER power to 95% with Recirculation Pumps. ---EQUALIZE Xenon concentration.  
- - - EQUALIZE Xenon concentration.
---ENSURE CROSSFLOW is BLOCKED and NOT APPLIED. ------ENSURE associated Schedule file open and running. ENSURE associated Events file open. ---PREP FOR TRAINING (i.e., RM11 set points, procedures, bezel covers) I initial I Description  
- - - ENSURE CROSSFLOW is BLOCKED and NOT APPLIED.
---------ENSURE Data Collection is trending the following variables:
- - - ENSURE associated Schedule file open and running.
* Instrument Air Header Pressure:
- - - ENSURE associated Events file open.
iapiarca/iapiarcb or equivalent  
PREP FOR TRAINING (i.e., RM11 set points, procedures, bezel covers)
'
I initial I Description ENSURE Data Collection is trending the following variables:
* Instrument Air Header Pressure: iapiarca/iapiarcb or equivalent
* W/R Reactor Water Level: rrln091a or equivalent
* W/R Reactor Water Level: rrln091a or equivalent
* Fuel Zone Reactor Water Level: rrlfzcha or equivalent At a minimum review the Scenario Reference section and CLEAN the balded EOPs, ABs and SOPs listed. (80091396 0270) COMPLETE the Simulator Ready for Training/Examination Checklist.
* Fuel Zone Reactor Water Level: rrlfzcha or equivalent At a minimum review the Scenario Reference section and CLEAN the balded EOPs, ABs and
ESG-2016 NRC-3 Page 3 of 28 Rev.: 1 EVENT FILE: Initial ET# 3 Event code: crqnmi <= 10
- - - SOPs listed. (80091396 0270)
- - - COMPLETE the Simulator Ready for Training/Examination Checklist.
ESG-2016 NRC-3                                     Page 3 of 28                                 Rev.: 1
 
EVENT FILE:
Initial ET#
Event code: crqnmi <= 10 3


== Description:==
== Description:==
Reactor Power <= 10%
Event code: hpnt >= 2500 & monvar{174) >= -50 4


Reactor Power <= 10% 4 Event code: hpnt >= 2500 & monvar{174)
== Description:==
>= -50
HPCI running and RPV Water Level >= -50" Event code: zcrpsudn 7


== Description:==
== Description:==
Mode Switch in SHUTDOWN Event code: zcrpsudn 8


HPCI running and RPV Water Level >= -50" 7 Event code: zcrpsudn
== Description:==
Mode Switch in SHUTDOWN Event code: crqnmi <= 7.0 10


== Description:==
== Description:==
 
Reactor Power <= 7%
Mode Switch in SHUTDOWN 8 Event code: zcrpsudn
Event code: crqnmi <= 7.0 11


== Description:==
== Description:==
 
Reactor Power <= 7%
Mode Switch in SHUTDOWN 10 Event code: crqnmi <= 7.0
Event code: rrprv <= 765 12


== Description:==
== Description:==
 
Reactor Pressure <750 psig Event code: ZDRRS621{5) & !et_array{14) 13
Reactor Power <= 7% 11 Event code: crqnmi <= 7.0


== Description:==
== Description:==
 
RR A raise pb first Event code: ZDRRS621{6) & !et_array{13) 14
Reactor Power <= 7% 12 Event code: rrprv <= 765


== Description:==
== Description:==
RR B raise pb first ESG-2016 NRC-3                                Page 4 of 28      Rev.: 1


Reactor Pressure <750 psig 13 Event code: ZDRRS621{5)  
MALFUNCTION SCHEDULE:
& !et_array{14)
Initial  @Time  Event   Action                                  Description None  None    Insert malfunction AD01                Failure of ADS valves to open Insert malfunction PC03E from          Drywell pressure transmitter N094E None  None 0.40000 to 0.40000                      failure Insert malfunction RR20E from None  None                                            ECCS level transmitter N091 E failure 30.00000 to 30.00000 RRCS Level Transmitter LT-N402E None  None    Insert malfunction RZ01 E to 31 Failure RRCS Level Transmitter LT-N402F None  None    Insert malfunction RZ01 F to 31 Failure Insert malfunction IA03 from 0.00000 None  None                                            Loss of drywell instrument gas to 25.00000 in 600 on event 1 None  None    Insert malfunction ED03 on event 2      Loss of 7.2 KV bus E 10A110 Insert malfunction QQ02 to SEIZE on None  None                                            Condensate pump BP102 trip event 3 Insert malfunction QQ03 to SEIZE on None  None                                            Condensate pump CP102 trip event 3 Insert malfunction FW04B after 3 on None  None                                            Secondary condensate pump BP137 trip event 3 Insert malfunction FW04C after 3 on
        ;None  None                                            Secondary condensate pump CP137 trip event 3 None  None    Insert malfunction HP03 on event 4      HPCI turbine trip CRYWOLF ANN B1C4 HPCI TURBINE None  None    Insert malfunction AN-81 C4 on event 4 TROUBLE None  None    Insert malfunction CD08A on event 4    CRD suction filter AF201 clogging None  None    Insert malfunction CD08B on event 4    CRD suction filter BF201 clogging Insert malfunction RR31 A2 after 120 to Recirc loop A large break [V] (10%-6000 None  None 5.00000 in 600 on event 4              gpm, 100%-60000 gpm)
Insert malfunction TC01-10 on event None  None                                            All turbine bypass valves fail closed 12 Insert malfunction RZ01 E to 31 on      RRCS Level Transmitter LT-N402E None  None event 10 delete in 1                    Failure Insert malfunction RZ01 F to 31 on    RRCS Level Transmitter LT-N402F None  None event 11 delete in 1                    Failure None  7      SET rp_k14b    =0.0                    Allows Mode Sw to trip 81 RPS None  8      SET rp_k14d    =0.0                    Allows Mode Sw to trip 82 RPS ESG-2016 NRC-3                            Page 5 of 28                                              Rev.: 1


==
REMOTE SCHEDULE:
Description:==
Initial  @Time Event  Action                              Description EP11 EOP-320 (step 5.2.2), RPS division None  None    Insert remote EP11 to INSTALLED 1 jumper EP13 EOP-320 (step 5.2.3), RPS division None  None    Insert remote EP13 to INSTALLED 3 jumper Insert remote CD04 to OPEN on event CD04 CRD suction filter isolation valve None  None 5                                  V030 OVERRIDE SCHEDULE:
Initial  @Time Event  Action                              Description None  None    Insert override 3S22_D_DI to On      RPS MODE SWITCH - RUN (DI)
None  None    Insert override 10S200_A_DI to Off  HV-F021 B OPEN (DI)
Insert override 9DS41_A_LO to On on None  None                                        TRIP UNIT IN CAL OR GROSS FAIL (LO) event 4 Insert override 3A28_C_DI to On on None  None                                        SIC-R621 A RAISE-REC IRC PUMP A (DI) event 13 Insert override 3A46_C_DI to On on None  None                                        SIC-R621 B RAISE-REC IRC PUMP B (DI) event 14 ESG-2016 NRC-3                            Page 6 of 28                                          Rev.: 1


RR A raise pb first 14 Event code: ZDRRS621{6)
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Response       Comments Recirculation Pum~
& !et_array{13)
* Crew recognizes Reactor Runaway:                         Recirculation pump runaway by:
 
Ensure ET-13(14) (Stuck         ==> OHA C1-A5 "COMPUTER RAISE push button) is               POINT IN ALARM" triggered when RR Pump           ==> Reaciorpower>100%
==
speed is increased.             ==> CRIDS D2899(2900)
Description:==
                                    "RECIRC MG A(B) SPEED CONTROL SIG FAIL"
 
                                ==> CRIDS D2930(1) "RECIRC MG A(B) DRIVE TUBE LOCK TRBL"
RR B raise pb first ESG-2016 NRC-3 Page 4 of 28 Rev.: 1 MALFUNCTION SCHEDULE:
                                ==> SIC-R621A(B) SPEED DEMND and SPEED Upscale
Initial @Time Event Action Description None None Insert malfunction AD01 Failure of ADS valves to open None None Insert malfunction PC03E from Drywell pressure transmitter N094E 0.40000 to 0.40000 failure None None Insert malfunction RR20E from ECCS level transmitter N091 E failure 30.00000 to 30.00000 None None Insert malfunction RZ01 E to 31 RRCS Level Transmitter L T-N402E Failure None None Insert malfunction RZ01 F to 31 RRCS Level Transmitter LT-N402F Failure None None Insert malfunction IA03 from 0.00000 Loss of drywell instrument gas to 25.00000 in 600 on event 1 None None Insert malfunction ED03 on event 2 Loss of 7.2 KV bus E 10A110 None None Insert malfunction QQ02 to SEIZE on Condensate pump BP102 trip event 3 None None Insert malfunction QQ03 to SEIZE on Condensate pump CP102 trip event 3 None None Insert malfunction FW04B after 3 on Secondary condensate pump BP137 trip event 3 ;None None Insert malfunction FW04C after 3 on Secondary condensate pump CP137 trip event 3 None None Insert malfunction HP03 on event 4 HPCI turbine trip None None Insert malfunction AN-81 C4 on event 4 CRYWOLF ANN B1C4 HPCI TURBINE TROUBLE None None Insert malfunction CD08A on event 4 CRD suction filter AF201 clogging None None Insert malfunction CD08B on event 4 CRD suction filter BF201 clogging None None Insert malfunction RR31 A2 after 120 to Recirc loop A large break [V] (10%-6000 5.00000 in 600 on event 4 gpm, 100%-60000 gpm) None None Insert malfunction TC01-10 on event All turbine bypass valves fail closed 12 None None Insert malfunction RZ01 E to 31 on RRCS Level Transmitter L T-N402E event 10 delete in 1 Failure None None Insert malfunction RZ01 F to 31 on RRCS Level Transmitter L T-N402F event 11 delete in 1 Failure None 7 SET rp_k14b = 0.0 Allows Mode Sw to trip 81 RPS None 8 SET rp_k14d = 0.0 Allows Mode Sw to trip 82 RPS ESG-2016 NRC-3 Page 5 of 28 Rev.: 1 REMOTE SCHEDULE:
                                ==> 1OC650C Recirc and Jet pump indications
Initial @Time Event Action Description None None Insert remote EP11 to INSTALLED EP11 EOP-320 (step 5.2.2), RPS division 1 jumper None None Insert remote EP13 to INSTALLED EP13 EOP-320 (step 5.2.3), RPS division 3 jumper None None Insert remote CD04 to OPEN on event CD04 CRD suction filter isolation valve 5 V030 OVERRIDE SCHEDULE:
Initial @Time Event Action Description None None Insert override 3S22_D_DI to On RPS MODE SWITCH -RUN (DI) None None Insert override 10S200_A_DI to Off HV-F021 B OPEN (DI) ' None None Insert override 9DS41_A_LO to On on TRIP UNIT IN CAL OR GROSS FAIL (LO) event 4 None None Insert override 3A28_C_DI to On on SIC-R621 A RAISE-REC I RC PUMP A (DI) event 13 None None Insert override 3A46_C_DI to On on SIC-R621 B RAISE-REC I RC PUMP B (DI) event 14 ESG-2016 NRC-3 Page 6 of 28 Rev.: 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Response Comments Recirculation
* Crew recognizes Reactor Runaway: Recirculation pump runaway by: Ensure ET-13(14) (Stuck ==> OHA C1-A5 "COMPUTER RAISE push button) is POINT IN ALARM" triggered when RR Pump ==> Reaciorpower>100%
speed is increased.  
==> CRIDS D2899(2900) "RECIRC MG A(B) SPEED CONTROL SIG FAIL" ==> CRIDS D2930(1) "RECIRC MG A(B) DRIVE TUBE LOCK TRBL" ==> SIC-R621A(B)
SPEED DEMND and SPEED Upscale ==> 1 OC650C Recirc and Jet pump indications
* RO performs the following:
* RO performs the following:
I ==> Presses SCOOP TUBE TRIP Immediate Operator for 'A' Recirc Pump Action IAW ==> Reduces A(B) Recirc Pump AB.RPV-0001.
Immediate Operator I
                                ==> Presses SCOOP TUBE TRIP for 'A' Recirc Pump       Action IAW
                                ==> Reduces A(B) Recirc Pump AB.RPV-0001.
speed to reduce power to Note: RR lockup may pre-transient value occur before pressing SCOOP TUBE TRIP ob.
speed to reduce power to Note: RR lockup may pre-transient value occur before pressing SCOOP TUBE TRIP ob.
* CRS implements AB.RPV-001:  
* CRS implements AB.RPV-001:
==> Condition F
                                ==> Condition F Crew reduces power to ::; 3840 RECORD the time that
* Crew reduces power to ::; 3840 RECORD the time that MWt as indicated by the PPC 5 power was above 3840 minute average following the MWt. Recirc Pump runaway. TIME:
* power was above 3840 MWt as indicated by the PPC 5 minute average following the   MWt.
Recirc Pump runaway.
TIME:
* Crew checks Recirc Loop Flow mismatch IAW ST.BB-0001.
* Crew checks Recirc Loop Flow mismatch IAW ST.BB-0001.
SUPPORT requests for local
SUPPORT requests for local control of Recirc MG Oil
* Crew ensures Recirc MG Oil control of Recirc MG Oil Temperatures are maintained in Temperatures.
* Crew ensures Recirc MG Oil Temperatures are maintained in Temperatures. ADJUST             the normal band.
ADJUST the normal band. REMOTES CW15 and CW16 as necessary.
REMOTES CW15 and CW16 as necessary.
* Crew Monitors Offgas Pretreatment AND Main Steam Line Radiation Monitors for indications of Fuel Damage. ESG-2016 NRC-3 Page 7 of 28 Rev.: 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student Response Comments IF called as RE to determine
* Crew Monitors Offgas Pretreatment AND Main Steam Line Radiation Monitors for indications of Fuel Damage.
* Crew determines peak thermal maximum thermal power power during the transient.
ESG-2016 NRC-3                         Page 7 of 28                                 Rev.: 1
 
V.     SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student Response           Comments IF called as RE to determine
* Crew determines peak thermal maximum thermal power               power during the transient.
reached, THEN REPORT APRM power peaked at 103.6%.
reached, THEN REPORT APRM power peaked at 103.6%.
* CRS recognize the following IF mismatch is Tech Specs/actions apply: observed, then must 2.C(1) Maximum Power Level restore recirc loop flow 3.4.1.3 Recirculation Loop mismatch within two Flow hours or declare the A(B) loop inoperable.
* CRS recognize the following   IF mismatch is Tech Specs/actions apply:     observed, then must
                                    ~  2.C(1) Maximum Power Level restore recirc loop flow
                                    ~  3.4.1.3 Recirculation Loop mismatch within two Flow                       hours or declare the A(B) loop inoperable.
PCIG Leak:
PCIG Leak:
* Crew recognizes PCIG leak by: With no operator action, After the Crew has taken GRIDS A3460 "PCIG PCIG receiver actions for the runaway RECEIVER AT201 PRESS" pressures will reach 50 Recirculation Pump, and at the lowering psig in about 10 discretion of the Lead GRIDS A3461 "PCIG minutes. Examiner, TRIGGER ET-1 ' RECEIVER BT201 PRESS" (PCIG Leak on Supply Line to lowering Torus). OHA A 1-A3 "INST GAS RECEIVER A PRESSURE LO" OHA A1-A4 "INST GAS RECEIVER B PRESSURE LO" :* GRIDS D4480 "INSTRUMENT GAS PNL AC213 ALARM" GRIDS D4481 "PCIG RECEIVER AT201 PRESSURE" GRIDS D4482 INSTRUMENT GAS PANEL BC213" GRIDS D4483 "PCIG RECEIVER BT201 PRESSURE" Both PCIG compressors running Insight Items:
* Crew recognizes PCIG leak by: With no operator action, After the Crew has taken           ~  GRIDS A3460 "PCIG         PCIG receiver actions for the runaway               RECEIVER AT201 PRESS"     pressures will reach 50 Recirculation Pump, and at the         lowering                   psig in about 10 discretion of the Lead             ~  GRIDS A3461 "PCIG         minutes.
* CRS implements AB.COMP-002:  
Examiner, TRIGGER ET-1           '     RECEIVER BT201 PRESS" (PCIG Leak on Supply Line to           lowering Torus).                             ~  OHA A 1-A3 "INST GAS RECEIVER A PRESSURE LO"
* 'A' PCIG Receiver press Condition A iapigrca * 'B' PCIG Receiver press iapigrcb ESG-2016 NRC-3 Page 8 of 28 Rev.: 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Response Comments
                                    ~  OHA A1-A4 "INST GAS RECEIVER B PRESSURE LO"
:* GRIDS D4480 "INSTRUMENT GAS PNL AC213 ALARM"
                                    ~  GRIDS D4481 "PCIG RECEIVER AT201 PRESSURE"
                                    ~  GRIDS D4482 INSTRUMENT GAS PANEL BC213"
                                    ~  GRIDS D4483 "PCIG RECEIVER BT201 PRESSURE"
                                    ~  Both PCIG compressors running Insight Items:
* CRS implements AB.COMP-002:
*   'A' PCIG Receiver press         ~  Condition A iapigrca
*   'B' PCIG Receiver press iapigrcb ESG-2016 NRC-3                           Page 8 of 28                                 Rev.: 1
 
V.     SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity   Expected Plant/Student Response       Comments
* Crew announces lowering PCIG pressure on plant page.
* Crew announces lowering PCIG pressure on plant page.
* RO/PO closes: => HV-5156A => HV-51568
* RO/PO closes:
                                  => HV-5156A
                                  => HV-51568
* Crew recognizes leak isolated by rising PCIG receiver pressures.
* Crew recognizes leak isolated by rising PCIG receiver pressures.
IF dispatched as Site
IF dispatched as Site
* Crew dispatches Site Protection Protection to check 02 levels, to conduct 02 samples in THEN REPORT all samples Reactor Building.
* Crew dispatches Site Protection Protection to check 02 levels,     to conduct 02 samples in THEN REPORT all samples           Reactor Building.
are normal. !E dispatched to look for PCIG
are normal.
* Crew dispatches RBEO and leak, Maintenance to investigate loss THEN REPORT no evidence of of PCIG. leak in PCIG rooms. You will begin walking down the lines I isolated by the 5156A/B. IF directed to reset local panel alarms, THEN TOGGLE Remote AN-01A and AN-018 to NORMAL. REPORT alarm was "Low Low Pressure".  
!E dispatched to look for PCIG
,, Loss of 10A110 Bus:
* Crew dispatches RBEO and leak,                             Maintenance to investigate loss THEN REPORT no evidence of         of PCIG.
leak in PCIG rooms. You will begin walking down the lines                                       I isolated by the 5156A/B.
IF directed to reset local panel alarms, THEN TOGGLE Remote AN-01A and AN-018 to NORMAL. REPORT alarm was "Low Low Pressure".
Loss of 10A110 Bus:
* Crew recognizes:
* Crew recognizes:
After the Crew takes actions for => Reactor power lowering the PCIG Leak, => Reactor level swell OR at the discretion of the Lead Examiner, TRIGGER ET-2.
After the Crew takes actions for   => Reactor power lowering the PCIG Leak,                     => Reactor level swell OR at the discretion of the Lead
: Examiner, TRIGGER ET-2.
* Crew monitors Reactor power, pressure, and level until plant conditions are stable.
* Crew monitors Reactor power, pressure, and level until plant conditions are stable.
* PO ensures Feedwater restores and maintains RPV level between L VL 4 and L VL 7. ESG-2016 NRC-3 Page 9 of 28 Rev.: 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student Response Comments
* PO ensures Feedwater restores and maintains RPV level between LVL 4 and LVL 7.
* Crew recognizes trip of 'A' Recirc pump by: => OHA C1-D4 "REACTOR RECIRC A TROUBLE" => OHA B3-F2 CROSSFLOW ALARM/TRBL  
ESG-2016 NRC-3                           Page 9 of 28                         Rev.: 1
=> 1 OC651 C pump d/p and flow indications  
 
=> Flashing Reactor Recirculation PUMP A MOTOR GENERATOR TRIP light
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student Response             Comments
* RO ensures at least one Reactor Recirc pump remains running. *Only if INST AIR HOR PRESS
* Crew recognizes trip of 'A' Recirc pump by:
* Crew recognizes loss of 10K107 reaches the LO Pressure by: alarm. ' OHA A2-B2 "COMPRESSED  
                                => OHA C1-D4 "REACTOR RECIRC A TROUBLE"
=> AIR PANEL OOC188" => 10K107 CPRSR MOT OVLD/PWR FAIL light => *OHA A2-A1/A2 "INST AIR HEADER A/B PRESS LO" => *GRIDS 04601 "INSTR AIR SPL Y HOR A PRESS LO" ,, => *GRIDS 04602 "INSTR AIR SPL Y HOR B PRESS" LO => Lowering Service and Instrument Air pressures
                                => OHA   B3-F2 CROSSFLOW ALARM/TRBL
* PO places OOK107 in service Immediate Operator IAW AB.ZZ-0001 Attachment  
                                => 1OC651 C pump d/p and flow indications
: 7. Action IAW AB.COMP-0001.
                                => Flashing Reactor Recirculation PUMP A MOTOR GENERATOR TRIP light
* CRS enters AB.COMP-0001 and May enter Condition A, verifies immediate operator but success path actions complete.
* RO ensures at least one Reactor Recirc pump remains running.
remains starting of OOK107.
*Only if INST AIR HOR PRESS
* Crew recognizes trip of AP102 The trips of AP102 and PCP and AP137 SCP by: AP137 are silent and => OVLD/PWR FAIL lights may not be immediately  
* Crew recognizes loss of 10K107 reaches the LO Pressure         by:
=> STOP lights lit recognized by the => Motor amps zero Crew. ESG-2016 NRC-3 Page 10 of 28 Rev.: 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Response Comments
alarm.             '           => OHA A2-B2 "COMPRESSED AIR PANEL OOC188"
* Crew validates automatic actions: => Feedwater PCP Speed Limiter on => Feedwater SCP Speed Limiter on => Recirc pump Intermediate Run back
                                => 10K107 CPRSR MOT OVLD/PWR FAIL light
* Crew recognizes loss of AK111 The trip of AK111 is TB chiller by: silent and may not be => Solid OVLD/PWR FAIL lights immediately recognized  
                                => *OHA A2-A1/A2 "INST AIR HEADER A/B PRESS LO"
=> STOP lights lit by the Crew. => Motor amps zero
                                => *GRIDS 04601 "INSTR AIR SPL Y HOR A PRESS LO"
* Crew recognizes loss of 1OA110 bus from: => OHA E3-E1 7.2 KV S.YS INCOMING BRKR MALF => OVLD/PWR FAIL lights on loads lost => Flashing TRIP light for infeed bkr52-11001  
                                => *GRIDS 04602 "INSTR AIR SPLY HOR B PRESS" LO
=> CRIDS D3677 "SWGR BUS A110 DIFF LOCKOUT" => CRIDS D3679 "SWGR BUS A110 UNDERVOL TAGE" => GRIDS D5447 "SWGR BUS A 110 OVERCURRENT LKOUT"
                                => Lowering Service and Instrument Air pressures
* Crew announces loss of 1OA110 The order of the AOP on the plant page. implementation may vary.
* PO places OOK107 in service       Immediate Operator IAW AB.ZZ-0001 Attachment 7.       Action IAW AB.COMP-0001.
* Crew recognizes entry into the OPRM Enable Region by: => OHA C3-F1 "OPRM TRIP ENABLED" => GRIDS D5941-5948 "OPRM TRIP ENABLED" ESG-2016 NRC-3 Page 11 of 28 Rev.: 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity I Expected Plant/Student Response Comments IF directed to monitor/control
* CRS enters AB.COMP-0001 and       May enter Condition A, verifies immediate operator       but success path actions complete.                 remains starting of OOK107.
* CRS implements AB.RPV-0003:
* Crew recognizes trip of AP102     The trips of AP102 and PCP and AP137 SCP by:             AP137 are silent and
Rx Power ::::::56%
                                => OVLD/PWR FAIL lights           may not be immediately
recirc MG oil temps, Condition B Core Flow ::::::43 Mlbm/hr THEN INSERT CW15 and Condition A on recorder CW16 and MONITOR: Core Flow ::::::44 Mlbm/hr
                                => STOP lights lit                 recognized by the
* rrtoila(1) for 'A' MG by adding JP loop flows
                                => Motor amps zero                 Crew.
ESG-2016 NRC-3                         Page 10 of 28                                   Rev.: 1
 
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Response           Comments
* Crew validates automatic actions:
                                => Feedwater PCP Speed Limiter on
                                => Feedwater SCP Speed Limiter on
                                => Recirc pump Intermediate Run back
* Crew recognizes loss of AK111     The trip of AK111 is TB chiller by:                   silent and may not be
                                => Solid OVLD/PWR FAIL lights     immediately recognized
                                => STOP lights lit               by the Crew.
                                => Motor amps zero
* Crew recognizes loss of 1OA110 bus from:
                                => OHA E3-E1 7.2 KV S.YS INCOMING BRKR MALF
                                => OVLD/PWR FAIL lights on loads lost
                                => Flashing TRIP light for infeed bkr52-11001
                                => CRIDS D3677 "SWGR BUS A110 DIFF LOCKOUT"
                                => CRIDS D3679 "SWGR BUS A110 UNDERVOLTAGE"
                                => GRIDS D5447 "SWGR BUS A 110 OVERCURRENT LKOUT"
* Crew announces loss of 1OA110     The order of the AOP on the plant page.               implementation may vary.
* Crew recognizes entry into the OPRM Enable Region by:
                                => OHA C3-F1 "OPRM TRIP ENABLED"
                                => GRIDS   D5941-5948 "OPRM TRIP ENABLED" ESG-2016 NRC-3                         Page 11 of 28                                   Rev.: 1
 
V.     SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity IExpected Plant/Student Response         Comments IF directed to monitor/control
* CRS implements AB.RPV-0003:   Rx Power ::::::56%
recirc MG oil temps,             ~  Condition B               Core Flow ::::::43 Mlbm/hr THEN INSERT CW15 and             ~  Condition A               on recorder CW16 and MONITOR:                                               Core Flow ::::::44 Mlbm/hr
* rrtoila(1) for 'A' MG                                       by adding JP loop flows
* rrtoila(2) for 'B' MG The pace of the scenario will not allow the Crew to fully address single loop requirements.
* rrtoila(2) for 'B' MG The pace of the scenario will not allow the Crew to fully address single loop requirements.
lE the Crew manually scrams,
lE the Crew manually scrams,
* IF in Region 1 of the Pwr/Flow THEN the Loss of Feedwater map, and LOCA will be automatically THEN RO inserts rods IAW ESG inserted.
* IF in Region 1 of the Pwr/Flow THEN the Loss of Feedwater       map, and LOCA will be automatically   THEN RO inserts rods IAW ESG inserted.                         guidance as necessary to exit Region 1.
guidance as necessary to exit Region 1.
* RO/PO close HV-F031A Recirc pump discharge valve for 5 minutes, then re-open.
* RO/PO close HV-F031A Recirc pump discharge valve for 5 minutes, then re-open.
* RO/PO implements DL.ZZ-0026 Att. 3v.
* RO/PO implements DL.ZZ-0026 Att. 3v.
* CRS implements AB.RPV-0001: Condition B
* CRS implements AB.RPV-0001:
* CRS implements AB.RPV-0004:
                                  ~  Condition B
May not enter if RPV Condition D level alarms not Condition G reached.
* CRS implements AB.RPV-0004:   May not enter if RPV
                                  ~  Condition D               level alarms not
                                  ~  Condition G               reached.
* PO closes HV-1680A PCP discharge valve.
* PO closes HV-1680A PCP discharge valve.
* PO closes HV-1651A SCP discharge valve.
* PO closes HV-1651A SCP discharge valve.
* PO bypasses Feedwater Run backs.
* PO bypasses Feedwater Run backs.
* CRS references AB.CONT-0001:
* CRS references AB.CONT-0001:   Due to pace of scenario
Due to pace of scenario Condition A and relatively small Condition E effect of AK 111 loss on drywell pressure, may NOT enter at this time. ESG-2016 NRC-3 Page 12 of 28 Rev.: 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity I Expected Plant/Student Response Comments WHEN dispatched,
                                  ~  Condition A               and relatively small
* Crew dispatches TBEO and THEN REPORT the 10A110 Maintenance to investigate loss Bus Differential Overcurrent of 10A110 bus. Relays are tripped. There is no visible indication of damage to the bus.
                                  ~  Condition E               effect of AK 111 loss on drywell pressure, may NOT enter at this time.
* CRS recognize the following actions apply: => Recirculation Loops 3.4.1 .1 action a 4.4.1.1.1  
ESG-2016 NRC-3                         Page 12 of 28                                 Rev.: 1
=> Reactor Coolant System Specific Activity TIS Table 4.4.5-1 Item 4(b) => ODCM Table 4.11.2.1.2-1 Items (c) & (f)
 
* CRS notifies Shift Rad Pro and Shift Chem Tech to take samples IAW: => TIS Table 4.4.5-1 Item 4(b) => ODCM Table 4.11.2.1.2-1 Items (c) & (f)
V.     SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity IExpected Plant/Student Response   Comments WHEN dispatched,
* CRS implements IO.ZZ-0006 . IF asked as RE,
* Crew dispatches TBEO and THEN REPORT the 10A110             Maintenance to investigate loss Bus Differential Overcurrent       of 10A110 bus.
* Crew contacts RE for guidance . THEN REPORT that inserting the first 12 steps of the CRAM rods can be used to achieve an 80% rod line. ACKNOWLEDGE any direction to evaluate single loop operation IAW SE-PR.ZZ-0003.
Relays are tripped. There is no visible indication of damage to the bus.
ESG-2016 NRC-3 Page 13 of 28 Rev.: 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Response Comments
* CRS recognize the following actions apply:
                                  => Recirculation Loops 3.4.1 .1 action a 4.4.1.1.1
                                  => Reactor Coolant System Specific Activity TIS Table 4.4.5-1 Item 4(b)
                                  => ODCM Table 4.11.2.1.2-1 Items (c) & (f)
* CRS notifies Shift Rad Pro and Shift Chem Tech to take samples IAW:
                                  => TIS Table 4.4.5-1 Item 4(b)
                                  => ODCM Table 4.11.2.1.2-1 Items (c) & (f)
* CRS implements IO.ZZ-0006 .
IF asked as RE,
* Crew contacts RE for guidance .
THEN REPORT that inserting the first 12 steps of the CRAM rods can be used to achieve an 80% rod line.
ACKNOWLEDGE any direction to evaluate single loop operation IAW SE-PR.ZZ-0003.
ESG-2016 NRC-3                           Page 13 of 28                     Rev.: 1
 
V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Response     Comments
* Crew contacts ESOC and Trading Floor, gives estimate of MWe output limitations and duration of limitation.
* Crew contacts ESOC and Trading Floor, gives estimate of MWe output limitations and duration of limitation.
Loss of Feedwater I ATWS:
Loss of Feedwater I ATWS:
* Crew recognizes loss of 20 minutes after the Loss of Feedwater by: 10A110 bus, => OHA A6-F2 "CONDENSATE OR TRAIN B TROUBLE I at the discretion of the Lead => OHA A6-F3 "CONDENSATE Examiner, TRAIN C TROUBLE TRIGGER ET-3. => OHA B3-E1 "RFP TURBINE TRIP" => Flashing SCP TRIP lights => RFPT Governor Valve I Positions  
* Crew recognizes loss of 20 minutes after the Loss of     Feedwater by:
=> Feed flow indications  
10A110 bus,                     => OHA A6-F2 "CONDENSATE I
=> Lowering RPV level
OR                                   TRAIN B TROUBLE at the discretion of the Lead   => OHA A6-F3 "CONDENSATE Examiner,                           TRAIN C TROUBLE TRIGGER ET-3.                   => OHA B3-E1 "RFP TURBINE TRIP"
* RO locks the Mode Switch in SHUTDOWN when RPV level drops to 15" IAW AB.RPV-0004 Retainment Override. (May scram earlier if the loss of RFPT's is recognized.}
                                => Flashing SCP TRIP lights
                                => RFPT Governor Valve I
Positions
                                => Feed flow indications
                                => Lowering RPV level
* RO locks the Mode Switch in SHUTDOWN when RPV level drops to 15" IAW AB.RPV-0004 Retainment Override.
(May scram earlier if the loss of RFPT's is recognized.}
* Crew recognizes Scram Condition and Reactor Power Above 4% EOP entry condition.
* Crew recognizes Scram Condition and Reactor Power Above 4% EOP entry condition.
ESG-2016 NRC-3 Page 14 of 28 Rev.: 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student Response Comments STRATEGIES FOR SUCESSFUL
ESG-2016 NRC-3                         Page 14 of 28                       Rev.: 1
* RO performs scram actions IAW The Mode Switch will TRANSIENT MITIGATION AB .ZZ-0001 Att. 1 . not actuate A1/A2 RPS, Reactor Scram Reports but the Arm & Depress Following a Reactor scram, the NCO should make an initial scram Pushbuttons will. report by announcing reactor ARI will not status IAW HC.OP-AB.ZZ-0001.
 
automatically initiate, Crew personnel should hold all but can be manually other non-essential initiated.
V.       SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity       Expected Plant/Student Response             Comments STRATEGIES FOR SUCESSFUL TRANSIENT MITIGATION
* RO performs scram actions IAW     The Mode Switch will AB .ZZ-0001 Att. 1.               not actuate A1/A2 RPS, Reactor Scram Reports but the Arm & Depress Following a Reactor scram, the NCO should make an initial scram                                           Pushbuttons will.
report by announcing reactor                                               ARI will not status IAW HC.OP-AB.ZZ-0001.                                               automatically initiate, Crew personnel should hold all                                             but can be manually other non-essential                                                       initiated.
communications until after the initial scram report is complete.
communications until after the initial scram report is complete.
The Control Room Supervisor should silence alarms during the scram report and the SM/CRS is not required to make a statement directing the NCO to check the overhead alarms, since these actions are already expected immediately following the scram. During the scram report, the NCO ' should report reactor level and pressure and their trends to the Control Room staff IAW HC.OPAB.ZZ-0001.
The Control Room Supervisor should silence alarms during the scram report and the SM/CRS is not required to make a statement directing the NCO to check the overhead alarms, since these actions are already expected immediately following the scram.
* Before Reactor Water Level RECORD the RPV level reaches L VL 1, the Crew at which RPS or ARI is manually actuates RPS and/or actuated.  
During the scram report, the NCO '
,, ARI to shutdown the reactor. RPV Level:
should report reactor level and pressure and their trends to the Control Room staff IAW HC.OPAB.ZZ-0001.
* Crew recognizes RPV LVL 3 RPS A1/A2 will not EOP entry condition:
Before Reactor Water Level         RECORD the RPV level
actuate on ANY =:> OHA C5-A4 "RPVWATER automatic scram LEVEL LO" signals. =:> OHA A7-D5 "RPV LEVEL 3" =:> Various water level indicators
* at which RPS or ARI is reaches L VL 1, the Crew manually actuates RPS and/or       actuated.
                                  ,,   ARI to shutdown the reactor.       RPV Level:
* Crew recognizes RPV LVL 3         RPS A1/A2 will not EOP entry condition:               actuate on ANY
                                        =:> OHA C5-A4 "RPVWATER           automatic scram LEVEL LO"                     signals.
                                        =:> OHA A7-D5 "RPV LEVEL 3"
                                        =:> Various water level indicators
* CRS enters EOP-101A.
* CRS enters EOP-101A.
* AFTER the reactor is verified to be shutdown, THEN CRS exits EOP-101 A, implements EOP-101. ESG-2016 NRC-3 Page 15 of 28 Rev.: 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Response I Comments I STRATEGIES FOR SUCESSFUL
* AFTER the reactor is verified to be shutdown, THEN CRS exits EOP-101 A, implements EOP-101.
* Crew recognizes RPV L VL 2 by: TRANSIENT MITIGATION OHA A7-E5 "RPV LEVEL 2" EOP 101 RPV Control. => Level Leg => OHA C8-C3 "NSSSS ISLN SIG -RPV LEVEL LO" Direct an initial band of +12.5" to +54" OHA C1-D3 "REACTOR Rx level. This gives a manageable  
ESG-2016 NRC-3                               Page 15 of 28                                     Rev.: 1
=> band with level control still in the RECIRC PUMPS TRIP" indicating range. If controlling  
 
=> OHA E3-E3 "USS FEEDER Reactor Pressure with SRVs and the BRKRTRBL" MSIVs are closed, then the RPV level band assigned should be -30" to +30" to avoid high level trips of injection systems when the reactor is being depressurized and to maintain forced circulation in the RPV. When maintaining RPV level is challenged by a lack of high pressure feed sources, and RPV level can not be maintained above -129", the crew should anticipate the actions that are necessary to implement EOP-202 and emergency depressurize the reactor prior to RPV level reaching -185". Reducing reactor pressure under these conditions in anticipation of implementing EOP-202 is not permitted since RPV level would be further challenged without sufficient high pressure feed sources available to maintain level.
V.       SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity           Expected Plant/Student Response     I       Comments I
STRATEGIES FOR SUCESSFUL TRANSIENT MITIGATION
* Crew recognizes RPV LVL 2 by:
                                          => OHA A7-E5 "RPV LEVEL 2" EOP 101 RPV Control.
                                          => OHA C8-C3 "NSSSS ISLN Level Leg SIG - RPV LEVEL LO" Direct an initial band of +12.5" to +54" Rx level. This gives a manageable         => OHA C1-D3 "REACTOR band with level control still in the         RECIRC PUMPS TRIP" indicating range. If controlling           => OHA   E3-E3 "USS FEEDER Reactor Pressure with SRVs and the           BRKRTRBL" MSIVs are closed, then the RPV level band assigned should be -30" to +30" to avoid high level trips of injection systems when the reactor is being depressurized and to maintain forced circulation in the RPV.
When maintaining RPV level is challenged by a lack of high pressure feed sources, and RPV level can not be maintained above -129", the crew should anticipate the actions that are necessary to implement EOP-202 and emergency depressurize the reactor prior to RPV level reaching -
185". Reducing reactor pressure under these conditions in anticipation of implementing EOP-202 is not permitted since RPV level would be further challenged without sufficient high pressure feed sources available to maintain level.
* PO verifies HPCl/RCIC initiation . HPCI will NOT initiate until the reactor is scrammed.
* PO verifies HPCl/RCIC initiation . HPCI will NOT initiate until the reactor is scrammed.
LOCA with Tri12 of HPCI:
LOCA with Tri12 of HPCI:
* PO recognizes trip of HPCI by: After HPCI recovers RPV water => OHA B1-A4 "HPCI TURBINE level to -50", ENSURE ET-4 TRIP" triggers to insert the LOCA with => OHA B1-B5 "HPCI OUT OF trip of HPCI, SERVICE" OR, => OHA B1-C4 "HPCI TURBINE at the discretion of the Lead TROUBLE" Examiner, => OHA B1-E5 "HPCI PUMP TRIGGER ET-4 manually.
* PO recognizes trip of HPCI by:
DISCHARGE FLOW LO" (The LOCA will start two => HPCI Stop Valve & Control minutes after HPCI trips) Valve failure to open => HPCI speed and flow indications
After HPCI recovers RPV water             => OHA B1-A4 "HPCI TURBINE level to -50", ENSURE ET-4                   TRIP" triggers to insert the LOCA with           => OHA B1-B5 "HPCI OUT OF trip of HPCI,                                 SERVICE" OR,                                       => OHA B1-C4 "HPCI TURBINE at the discretion of the Lead                 TROUBLE" Examiner,                                 => OHA B1-E5 "HPCI PUMP TRIGGER ET-4 manually.                       DISCHARGE FLOW LO"
* PO informs CRS of HPCI trip . ESG-2016 NRC-3 Page 16 of 28 Rev.: 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Response Comments IF dispatched to investigate
                                          => HPCI Stop Valve & Control (The LOCA will start two minutes after HPCI trips)                     Valve failure to open
* Crew dispatches ABEO and HPCI trip units, Maintenance to investigate trip of THEN REPORT: HPCI.
                                          => HPCI speed and flow indications
* PO informs CRS of HPCI trip .
ESG-2016 NRC-3                                 Page 16 of 28                                       Rev.: 1
 
V.       SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity     Expected Plant/Student Response     Comments IF dispatched to investigate
* Crew dispatches ABEO and HPCI trip units,                     Maintenance to investigate trip of THEN REPORT:                         HPCI.
* E41-N656E Turb Exhaust Pressure is reading upscale with trip and gross fail lights lit.
* E41-N656E Turb Exhaust Pressure is reading upscale with trip and gross fail lights lit.
* E41-N656A Turb Exhaust Pressure is reading 0 IF dispatched to 'C' PCP,
* E41-N656A Turb Exhaust Pressure is reading 0 IF dispatched to 'C' PCP,
* Crew may dispatch TBEO and THEN REPORT the 51A and Maintenance to investigate trip of 51 C Time Overcurrent relays 'C' PCP. are tripped on the breaker (52-10208) and the motor is hot to the touch. IF dispatched to 'B/C' SCP's, THEN REPORT there are no apparent problems with the pumps or their breakers.
* Crew may dispatch TBEO and THEN REPORT the 51A and               Maintenance to investigate trip of 51 C Time Overcurrent relays         'C' PCP.
* Crew recognizes LOCA condition:  
are tripped on the breaker (52-10208) and the motor is hot to the touch.
=> OHA C6-B 1 "OLD SYSTEM ALARM/TRBL" => RM11 9AX314 OLD FLOOR ,, ORN FLOW alarm => RM 11 9AX317 /318/320 OLD CCM alarms => OHA D3-C3 "DRYWELL SUMP LEVEL HI/LO" => OHA A4-F5 "COMPUTER PT IN ALARM" => OHA A 7-E4 "DRYWELL PRESSURE HI/LO" => Rising Drywell Pressure on various indicators
IF dispatched to 'B/C' SCP's, THEN REPORT there are no apparent problems with the pumps or their breakers.
* Crew recognizes LOCA condition:
                                      => OHA C6-B 1 "OLD SYSTEM ALARM/TRBL"
              ,,                    => RM11 9AX314 OLD FLOOR ORN FLOW alarm
                                      => RM 11 9AX317 /318/320 OLD CCM alarms
                                      => OHA D3-C3 "DRYWELL SUMP LEVEL HI/LO"
                                      => OHA A4-F5 "COMPUTER PT IN ALARM"
                                      => OHA A 7-E4 "DRYWELL PRESSURE HI/LO"
                                      => Rising Drywell Pressure on various indicators
* CRS references AB.CONT-0006
* CRS references AB.CONT-0006
* CRS references AB.CONT-0001  
* CRS references AB.CONT-0001
=> Condition A
                                      => Condition A
* RO/PO ensures drywell cooling is maximized.
* RO/PO ensures drywell cooling is maximized.
ESG-2016 NRC-3 Page 17 of 28 Rev.: 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE I Event / Instructor Activity I Expected Plant/Student Response Comments
ESG-2016 NRC-3                             Page 17 of 28                         Rev.: 1
* Crew checks =:> Recirc pump seal parameters  
 
=:> SRV temperatures
V.     SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE I   Event / Instructor Activity IExpected Plant/Student Response             Comments
* Crew recognizes High Drywell Pressure EOP entry condition:  
* Crew checks
=:> OHA A7-D4 "DRYWELL PRESSURE HI/HI" =:> OHA C5-B5 "DRYWELL PRESSURE HI" =:> Various system initiations and isolations.
                                    =:> Recirc pump seal parameters
                                    =:> SRV temperatures
* Crew recognizes High Drywell Pressure EOP entry condition:
                                    =:> OHA A7-D4 "DRYWELL PRESSURE HI/HI"
                                    =:> OHA C5-B5 "DRYWELL PRESSURE HI"
                                    =:> Various system initiations and isolations.
* CRS implements EOP-102, re-enters EOP-101.
* CRS implements EOP-102, re-enters EOP-101.
* RO/PO verifies automatic actions. I Failure of 'A' Channel
* RO/PO verifies automatic actions.
* Crew recognizes failure of the A PCIS LOCA L VL 2 Initiations:
I Failure of 'A' Channel
Core Spray logics to initiate by: initiations WILL occur. The failure of 'A' Core Spray =:> A INIT AND SEALED IN light and RHR logics to auto initiate extinguished is already inserted.  
* Crew recognizes failure of the A   PCIS LOCA LVL 2 Initiations:                       Core Spray logics to initiate by: initiations WILL occur.
=:> Pump STOPPED indication  
The failure of 'A' Core Spray     =:> A INIT AND SEALED IN light and RHR logics to auto initiate       extinguished is already inserted.               =:> Pump STOPPED indication
=:> A channel breaker status on 1 OC650E NON CLASS 1 E LOAD ISLN CIRCUIT BREAKER STATUS AND CONTROL =:> A EDGs not running =:> Various valve failures to isolate
                                    =:> A channel breaker status on 1OC650E NON CLASS 1E LOAD ISLN CIRCUIT BREAKER STATUS AND CONTROL
                                    =:> A EDGs not running
                                    =:> Various valve failures to isolate
* RO/PO manually initiates Core Spray 'A' logic.
* RO/PO manually initiates Core Spray 'A' logic.
* Crew recognizes failure of the 'A' RHR logic to initiate by: =:> A INIT AND SEALED IN light extinguished  
* Crew recognizes failure of the 'A' RHR logic to initiate by:
=:> Pump STOPPED indication
                                    =:> A INIT AND SEALED IN light extinguished
* RO/PO manually initiates  
                                    =:> Pump STOPPED indication
'A' RHR logic.
* RO/PO manually initiates 'A' RHR logic.
* RO/PO trips 'B' recirc pump if not already tripped by RPV Level 2. ESG-2016 NRC-3 Page 18 of 28 Rev.: 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student Response Comments
* RO/PO trips 'B' recirc pump if not already tripped by RPV Level 2.
ESG-2016 NRC-3                           Page 18 of 28                                   Rev.: 1
 
V.     SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity   Expected Plant/Student Response         Comments
* CRS directs restoring PCIG to SRVs and Rx Bldg to Torus Vac Bkrs.
* CRS directs restoring PCIG to SRVs and Rx Bldg to Torus Vac Bkrs.
* RO/PO restores PCIG to SRVs and Rx Bldg to Torus Vac Bkrs IAW AB.ZZ-0001 Att. 9. * !Ethe Crew attempts to reduce pressure with the bypass valves, THEN Crew recognizes the bypass valves fail shut at 750# by: => OHA E1-F4 "COMPUTER PT RETURN TO NORMAL" => OHA D3-D5 "EHC UNIT PANEL 1 OC363" => Bypass valve indication BPV Positioning Error alarms ' => IF directed to align for two CRD
* RO/PO restores PCIG to SRVs and Rx Bldg to Torus Vac Bkrs IAW AB.ZZ-0001 Att. 9.
* CRS orders injection with two CRD pumps will trip on pump injection, CRD pumps. low suction pressure THEN PERFORM the
                                * !Ethe Crew attempts to reduce pressure with the bypass valves, THEN Crew recognizes the bypass valves fail shut at 750#
* CRS orders injection with SLC due to suction filter following:
by:
pumps. clogging.
                                  => OHA E1-F4 "COMPUTER PT RETURN TO NORMAL"
REFER to SO.BF-0001 Sect
                                  => OHA D3-D5 "EHC UNIT PANEL 1OC363"
* WHEN RPV water level drops 5.4. to -129", TRIGGER ET-5 (Suction filter). THEN the Crew inhibits ADS. SET Remote Function for Stby CRD pump discharge valve to 0% (CD01/CD02).
                                  => Bypass valve indication
REPORT Stby CRD pump ready for start. WHEN Stby CRD is running, THEN RAMP discharge valve to 100% open. Due to suction filter clogging, the CRD pumps will trip before the remainder of the lineup can be completed.
                                  => BPV Positioning Error alarms                             '
ESG-2016 NRC-3 Page 19 of 28 Rev.: 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student Response Comments
IF directed to align for two CRD
* WHEN the Crew determines RECORD compensated RPV water level cannot be RPV water level when maintained above -185", the Crew determines THEN the CRS implements EOP that Emergency 202. Depressurization is
* CRS orders injection with two   CRD pumps will trip on pump injection,                   CRD pumps.                       low suction pressure THEN PERFORM the                                                   due to suction filter following:
* Crew determines that required.
* CRS orders injection with SLC clogging.
Emergency Depressurization is required before LEVEL: compensated RPV water level reaches -185"; AND subsequently restores and maintains RPV water level to above -161 ". STRATEGIES FOR SUCESSFUL
pumps.
* WHEN directed, TRANSIENT MITIGATION THEN RO/PO open five ADS Emergency Depressurization Level Response And Control SRVs IAW AB.ZZ-0001 Att. 13. The Control Room Supervisor should I ensure that all ECCS is lined up for injection as required prior to initiating an emergency depressurization.
REFER to SO.BF-0001 Sect 5.4.
Only ECCS required to support RPV reflood needs to be lined up for injection.
* WHEN RPV water level drops to -129",
* RO/PO restore RPV level IAW IF the 'A' Core Spray AB.ZZ-0001:
TRIGGER ET-5 (Suction filter). THEN the Crew inhibits ADS.
logic was NOT .Att. 4 for RHR manually initiated, Att. 5 for Core Spray THEN the 'A' Core Spray loop will need to be manually aligned for injection during the blowdown.
SET Remote Function for Stby CRD pump discharge valve to 0% (CD01/CD02).
ESG-2016 NRC-3 Page 20 of 28 Rev.: 1 V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE I Event / Instructor Activity J Expected Plant/Student Response Comments STRATEGIES FOR SUCESSFUL
REPORT Stby CRD pump ready for start.
* AFTER adequate core cooling is TRANSIENT MITIGATION restored, Emergency Depressurization THEN CRS directs placing RHR Level Response And Control For non-ATWS emergency in Suppression Pool Cooling and depressurizations, the Control Room Spray. Supervisor should establish and maintain an RPV level band between -38" to +54" on Wide Range indication.
WHEN Stby CRD is running, THEN RAMP discharge valve to 100% open.
This transient level band will prevent adverse hydraulic effects caused by high outside shroud reactor level while maintaining adequate core submergence based on Fuel Zone indication.
Due to suction filter clogging, the CRD pumps will trip before the remainder of the lineup can be completed.
Following the emergency depressurization, level will be restored and maintained to the preferred EOP reactor level band by using a suggested Wide Range compensated level band of +12.5" to +54" if possible using I Condensate and Startup Level Control or the Control Room Supervisor can maintain an RPV level band of -38" to +54" if still batch feeding with low pressure ECCS to maintain RPV level.
ESG-2016 NRC-3                           Page 19 of 28                                   Rev.: 1
* RO/PO place RHR in Suppression Pool Cooling and Spray as directed by CRS IAW AB.ZZ-0001 Attachment  
 
: 3.
V.       SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity             Expected Plant/Student Response       Comments
* AFTER adequate core cooling is restored, THEN CRS directs placing one loop of RHR in Drywell Spray. Termination Reguirement:
* WHEN the Crew determines     RECORD compensated RPV water level cannot be     RPV water level when maintained above -185",       the Crew determines THEN the CRS implements EOP   that Emergency 202.                         Depressurization is Crew determines that         required.
* RO/PO place RHR in Drywell The HV-F021 B will The scenario may be Spray as directed by CRS IAW NOT open. terminated at the discretion of AB.ZZ-0001 Attachment  
* Emergency Depressurization is required before           LEVEL:
: 2. The 'A' RHR pump the Lead Examiner when the CANNOT be placed in RPV has been depressurized drywell spray UNLESS and level is being maintained the 'A' RHR logic has above -129". been manually initiated.
compensated RPV water level reaches -185"; AND subsequently restores and maintains RPV water level to above -161 ".
ESG-2016 NRC-3 Page 21 of 28 Rev.: 1}}
STRATEGIES FOR SUCESSFUL TRANSIENT MITIGATION
* WHEN directed, THEN RO/PO open five ADS Emergency Depressurization SRVs IAW AB.ZZ-0001 Att. 13.
Level Response And Control I
The Control Room Supervisor should ensure that all ECCS is lined up for injection as required prior to initiating an emergency depressurization. Only ECCS required to support RPV reflood needs to be lined up for injection.
* RO/PO restore RPV level IAW   IF the 'A' Core Spray AB.ZZ-0001:                   logic was NOT
                                            ~: .Att. 4 for RHR           manually initiated,
                                            ~ Att. 5 for Core Spray       THEN the 'A' Core Spray loop will need to be manually aligned for injection during the blowdown.
ESG-2016 NRC-3                                   Page 20 of 28                               Rev.: 1
 
V.       SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE I   Event / Instructor Activity         J Expected Plant/Student Response         Comments STRATEGIES FOR SUCESSFUL TRANSIENT MITIGATION
* AFTER adequate core cooling is restored, Emergency Depressurization THEN CRS directs placing RHR Level Response And Control For non-ATWS emergency                     in Suppression Pool Cooling and depressurizations, the Control Room       Spray.
Supervisor should establish and maintain an RPV level band between
-38" to +54" on Wide Range indication. This transient level band will prevent adverse hydraulic effects caused by high outside shroud reactor level while maintaining adequate core submergence based on Fuel Zone indication. Following the emergency depressurization, level will be restored and maintained to the preferred EOP reactor level band by using a suggested Wide Range compensated level band of
+12.5" to +54" if possible using                                                   I Condensate and Startup Level Control or the Control Room Supervisor can maintain an RPV level band of -38" to +54" if still batch feeding with low pressure ECCS to maintain RPV level.
* RO/PO place RHR in Suppression Pool Cooling and Spray as directed by CRS IAW AB.ZZ-0001 Attachment 3.
* AFTER adequate core cooling is restored, THEN CRS directs placing one loop of RHR in Drywell Spray.
Termination Reguirement:
* RO/PO place RHR in Drywell     The HV-F021 B will The scenario may be                       Spray as directed by CRS IAW   NOT open.
terminated at the discretion of           AB.ZZ-0001 Attachment 2.       The 'A' RHR pump the Lead Examiner when the                                                 CANNOT be placed in RPV has been depressurized                                                 drywell spray UNLESS and level is being maintained                                             the 'A' RHR logic has above -129".                                                               been manually initiated.
ESG-2016 NRC-3                                   Page 21 of 28                                 Rev.: 1}}

Latest revision as of 23:44, 4 February 2020

Final Operating Exam (Sections a, B, and C) (Folder 3)
ML16295A057
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 10/01/2016
From: Todd Fish
Operations Branch I
To:
Public Service Enterprise Group
Shared Package
ML15308A608 List:
References
TAC U01925
Download: ML16295A057 (157)


Text

JOB PERFORMANCE MEASURE STATION: Hope Creek 2016 NRC EXAM Copy _ _ of _ _

RO-JPM A1 SYSTEM: Administrative TASK NUMBER: 2990010101 TASK: Perform The Watchstanding Duties Of The Nuclear Control Room Operator JPM NUMBER: 305H-JPM.ZZXXX REVISION: 00 SAP BET: NOH05JPZZXXE KIA NUMBER: 2.1.5 Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.

(CFR: 41.10 I 43.5 I 45.12)

IMPORTANCE FACTOR: RO: 2.9 SRO: 3.9 ALTERNATE PATH: D APPLICABILITY: RO IZJ SRoD EVALUATION SETTING/METHOD: Classroom/Perform

REFERENCES:

OP-AA-105-102, Rev. 11 TOOLS, AND EQUIPMENT: None ESTIMATED COMPLETION TIME:

- - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:

- -N/A- - - Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME:

- - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME:

- -N/A

- - - Minutes REASON IF UNSATISFACTORY:

EVALUATOR: DATE:

Signature Page 1of12

JOB PERFORMANCE MEASURE SYSTEM: Administrative TASK NUMBER: 2990010101 TASK: Perform The Watchstanding Duties Of The Nuclear Control Room Operator INITIAL CONDllTONS:

1. You were issued a Reactor Operator (RO) License on May 15, 2016, and assigned as the Tagging NCO in Work Control.
2. The computer system is down and the status of your active license must be verified.
3. All shifts stood have been confirmed to be part of the Narrative Log.
4. All shifts included turnovers.

INITIATING CUE:

1. Fill out OP-AA-105-102 Attachment 1 for the third quarter of 2016.
2. Assume no other watchstanding will occur for the remainder of the third quarter of 2016.
3. REVIEW AND DETERMINE lE you will meet the requirements to maintain an active license into the fourth quarter of 2016.
4. Document how you did, or did not, meet the requirements on the following page.

Examiner's Note: Provide past work schedule and a copy of OP-AA-105-102.

Page 2of12

JPM NUMBER: zzxxx NAME: ~~~~~~~~~~~~~~~~~

REV NUMBER: 00 DATE:

STANDARD COMMENTS STEP SAT/

ELEMENT (*Critical Step) (Required for NUMBER UNSAT

(#Sequential Step) UNSAT)@

CUE: PROVIDE the operator the initiating cue AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.

START TIME:

OP-AA-105-102

4. MAIN BODY NOTE: The quarterly shift watch Operator reads NOTE.

requirement may be completed with a combination of complete 8 and 12-hour shifts (in a position appropriately credited for watch-standing proficiency as discussed below) at sites having a mixed shift schedule, and watches shall not be truncated when the minimum quarterly requirement (56 hours6.481481e-4 days <br />0.0156 hours <br />9.259259e-5 weeks <br />2.1308e-5 months <br />) is satisfied. (NUREG I 1021, Revision 9) 4.1 Active License Maintenance Page 3of12

JPM NUMBER: zzxxx NAME:

REV NUMBER: 00 DATE:

STANDARD COMMENTS STEP SAT/

ELEMENT (*Critical Step) (Required for NUMBER UNSAT

(#Sequential Step) UNSAT)!a>

NOTE: As specified in 10 CFR 55.4, Operator reads NOTE.

"Definitions," "Actively performing the functions of an operator or senior operator,"

means that "the individual carries out and is responsible for the duties covered by that position". For RO and SRO watches being credited for license maintenance, administrative tasks not related to the licensed position should be minimized. Non-position related administrative tasks performed outside the control room, e.g., NRC physicals, all hands meetings, etc., shall not be scheduled during a credited shift. Non-position related administrative tasks performed inside the control room are allowed during'a credited shift provided the activities do not impact the individual's ability to perform assigned licensed responsibilities; i.e., the individual is in a position to provide prompt assistance to or oversight of the RO at the controls.

4.1.1. MAINTAIN an active license by Operator reads Step.

actively performing the functions of RO, SRO or LSRO.

1. RO licenses by performing the duties of the Unit RO and/or Unit PO for a minimum of seven 8-hour or five 12-hour shifts per calendar quarter, including turnover to the next shift.

4.1.2 DOCUMENT the required *operator documents the shifts number of shifts on Attachment on 7/10, 7/31, and 8/6 as the 1, Active License Tracking Log required shifts on Attachment 1.

or similar computer-based tracking method. Examiner Note: Refer to Examiner's Copy of Attachment 1.

The order of shifts is not critical.

Page 4of12

JPM NUMBER: ~~~~~~~~~-

ZZXXX NAME:

REV NUMBER: 00 DATE:

STANDARD COMMENTS STEP SAT/

ELEMENT (*Critical Step) (Required for NUMBER UNSAT

(#Sequential Step) UNSAT}@

  • operator documents that the requirements to maintain an active license into the fourth quarter have NOT been met.

Examiner Note: Operator is considered current for the third quarter.

  • operator documents that additional watches need to be completed by September 30, 2016 to maintain proficiency.

CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Task Standard: Operator determines license maintenance requirements have not been met. Specifically only 4 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts were worked in the second quarter.

@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]

Page 5of12

JOB PERFORMANCE MEASURE STATION: Hope Creek 2016 NRC EXAM Copy _ _ of _ _

RO-JPM A2 SYSTEM: Administrative TASK NUMBER: 4010260201 TASK: Complete A Sunday Shift Routine Log JPM NUMBER: 305H-JPM.ZZOXX REVISION: 00 SAP BET: NOH05JPZZXXE KIA NUMBER: 2.1 .. 25 Ability to interpret reference materials, such as graphs, curves, tables, etc.

(CFR: 41.10 I 43.5 I 45.12)

IMPORTANCE FACTOR: RO: 3.9 SRO: 4.2 ALTERNATE PATH: D APPLICABILITY: RO~ sRoD EVALUATION SETTING/METHOD: Classroom/Perform

REFERENCES:

OP-HC-108-116-1001 Rev. 3 HC.OP-DL.ZZ-0020, Rev. 38 TOOLS, AND EQUIPMENT: OP-HC-108-116-1001; Straight-edge, Calculator ESTIMATED COMPLETION Tll)llE: ----

7 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: ----

N/A Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME:

- - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A

-- - - Minutes REASON IF UNSATISFACTORY:

EVALUATOR: DATE:

Signature Page 1of7

JOB PERFORMANCE MEASURE SYSTEM: Administrative TASK NUMBER: 4010260201 TASK: Complete A Sunday Shift Routine Log INITIAL CONDllTONS:

1. Plant is operating at 100% power fifteen (15) days following a refueling outage.
2. HC.OP-DL.ZZ-0020, Sunday Shift Routine Log, is in progress at Step 3.6.7.
3. GRIDS A3175, FUEL POOL HX COMMON INLET TEMP, indicates 83F.
4. The Reactor Engineer is not available.

INITIATING CUE:

DETERMINE the time for the Hope Creek Spent Fuel Pool (SFP) to reach 200 degrees Fahrenheit {bulk temperature) in the event that normal cooling is lost IAW OP-HC-108-116-1001. ENTER your determination on Attachment 3.

Page 2 of 7

JPM NUMBER: zzoxx NAME: ~~~~~~~~~~~~~~~~-

REV NUMBER: 00 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

CUE: PROVIDE the operator the initiating cue, modified OP-HC-108-116-1001, AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.

START TIME:

OP-HC-108-116-1001

4. MAIN BODY 4.1 Utilizing Attachment 1, Spent *#operator determines that the Fuel Pool Decay Heat Load approximate SFP decay heat rate Determination, determine the for the current date is approximate SFP decay heat approximately 9.5 ;t0.1 MBtu/hr.

rate for the current date.

4.2 Select the series of curves from *#operator selects Page 4 of Attachment 2 for loss of ATTACHMENT 2.

cooling, with the initial pool temperature that most closely matches current pool temperature, (round up to the next highest Fuel Pool '

Temperature curve).

4.3 Utilizing the decay heat rate *# Operator determines the time determined in 4.1, determine in hours for the SFP to reach the time in hours for the SFP to 200°F in the event normal reach 200 °F in the event cooling is lost to be 44 ;t2 hours, normal cooling is lost. IF necessary, interpolate the heat and enters this time on Attachment load between lines. 3. ,,

4.4 Submit the completed time to Operator submits the completed CRS for review. time to CRS for review.

CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Task Standard: Operator determines the Spent Fuel Pool decay heat load IAW OP-HC-108-116-1001.

@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]

Page 3of7

JOB PERFORMANCE MEASURE STATION: Hope Creek 2016 NRC EXAM Copy _ _ of _ _

RO-JPM A3 SYSTEM: Administrative TASK NUMBER: 2990020301 TASK: Perform A Manual Tagout With SAP System Inoperable JPM NUMBER: 305H-JPM.ZZXXX REVISION: 00 SAP BET: NOH05JPZZXXE KIA NUMBER: 2.2.41 Ability to obtain and interpret station electrical and mechanical drawings.

(CFR: 41.10 / 45.12 / 45.13)

IMPORTANCE FACTOR: RO: 3.5 SRO: 3.9 ALTERNATE PATH: D APPLICABILITY: RO~ sRoD EVALUATION SETTING/METHOD: Classroom/Perform

REFERENCES:

M-51-1 Sheets 1 and 2, Rev. 50/44 OP-AA-109-115, Rev. 7 TOOLS, AND EQUIPMENT: Highlighters; M-51-1 Sheets 1 and 2 [Large Size]

ESTIMATED COMPLETION T'ME: _ _1_7_ _ Minutes TIME PERIOD IDENTIF.IED FOR TIME CRITICAL STEPS: N/A

-- - - Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME:

- - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A

-- - - Minutes REASON IF UNSATISFACTORY:

EVALUATOR: DATE:

Signature Page 1of11

JOB PERFORMANCE MEASURE SYSTEM: Administrative TASK NUMBER: 2990020301 TASK: Perform A Manual Tagout With SAP System Inoperable INITIAL CONDllTONS:

1. The plant is operating at 100% power.
2. The Residual Heat Removal (RHR) System is in its normal standby lineup.
3. HV-F007C, RHR Pump C Min Flow Valve, is scheduled for in-body repair work.

INITIATING CUE:

HV-F007C, RHR Pump C Min Flow Valve, and its associated piping and electrical components need to be ISOLATED, VENTED, AND DRAINED to perform the repairs. Using controlled station drawing M-51-1, sheets 1 and 2 (provided):

1. IDENTIFY the Mechanical components that are required to be tagged, and their required positions.
2. IDENTIFY the Electrical components that are required to be tagged, and their required positions, NOTE: The following are NOT required to be identified:
  • Electrical Breaker number(s)
  • Control switches
  • Type of tag (Red blocking Tag, Worker Blocking Tag, etc)
  • Current position
  • Tag Sequence Page 2of11

JPM NUMBER: zzxxx NAME: ~~~~~~~~~~~~~~~~~

REV NUMBER: 00 DATE:

STANDARD COMMENTS STEP SAT/

ELEMENT (*Critical Step) (Required for NUMBER UNSAT

(#Sequential Step) UNSAT)@

CUE: PROVIDE the operator: the initiating cue; M-51-1, Sheets 1 and 2; AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue.

START TIME:

OP-AA-109-115 4.1.2 Determine Blocking Points and Tag Types (Initiator)

1. Review the following:

- Controlled Documents and Drawings from the Operator reviews provided M-51-1, TOR or DCRMS. If... Sheets 1 and 2.

2. Perform the following: Operator determines the blocking points AND required positions by

- Select blocking points reviewing the controlled drawing.

and tag types.

Applicant identifies the following mechanical isolation valves:

Applicant identifies the following mechanical isolation valves AND the required positions:

  • *V132, SHUT
  • *V317, S.HUT
  • *HV-F024A (V124), SHUT
  • *HV-F010A (V125), SHUT
  • *HV-F011A (V126), SHUT
  • *v20s, SHUT
  • *HV-F007A (V128), SHUT Applicant identifies the following mechanical VENT AND the required positions:
  • *V372, OPEN
  • *V373, OPEN Examiner Note: V338 and V339 would satisfy this vent path.

Page 3of11

JPM NUMBER: ZZXXX

~~~~~~~~~-

NAME: ~~~~~~~~~~~~~~~~~

REV NUMBER: 00 DATE:

STANDARD COMMENTS STEP SAT/

ELEMENT (*Critical Step) (Required for NUMBER UNSAT

(#Sequential Step) UNSAT)@

Applicant identifies the following mechanical DRAIN valves AND the required positions:

  • *V554, OPEN
  • *V555, OPEN Applicant identifies the following ELECTRICAL components AND the required positions:
  • *HV-F007C (V131) MOV breaker, OPEN
  • *HV-F024A (V124) MOV breaker, OPEN
  • *HV-F010A (V125) MOV breaker, OPEN
  • *HV-F007A (V128) MOV breaker, OPEN Examiner Note: Breaker numbers are not required.

Examiner Note: The Applicant may identify the following additional components as part of the tagout for equipment protection or safety precaution (not considered critical):

  • HV-F007C (V131 ), OPEN (to allow proper draining on both upstream/downstream sides of valve)
  • CP202 RHR Pump 4kV Breaker, OPEN/PTL
  • AP202 RHR Pump 4kV Breaker, OPEN/PTL
  • V338 AND/OR V339, CLOSED (test connection). Unless opened as vent path.
  • V9988 AND V9989, CLOSED (flow ports for FE4436C)
  • AP202 and CP202 control room hand switches Page 4of11

JPM NUMBER: ~~~~~~~~~~

ZZXXX NAME: ~~~~~~~~~~~~~~~~~

REV NUMBER: 00 DATE:

STANDARD COMMENTS STEP SAT/

ELEMENT (*Critical Step) (Required for NUMBER UNSAT

(#Sequential Step) UNSAT)@

CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Task Standard: Operator IDENTIFIES the mechanical and electrical components, and their required positions, to ISOLATE, VENT, AND DRAIN the affected pipe using controlled station Mechanical Drawings as noted.

@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]

Page 5of11

JOB PERFORMANCE MEASURE STATION: Hope Creek 2016 NRC EXAM Copy _ _ of _ _

SRO-JPM A1 SYSTEM: Conduct of Operations TASK NUMBER: 4010010201 TASK: Complete the Daily Surveillance Logs JPM NUMBER: 305H-JPM.ZZ017 REVISION: 04 SAP BET: NOH05JPZZ17E K/A NUMBER: 2.1.18 Ability to make accurate, clear, and concise logs, records, status boards, I and reports.

(CFR: 41.10 I 45.12 I 45.13)

IMPORTANCE FACTOR: RO: 3.6 SRO: 3.8 ALTERNATE PATH: D APPLICABILITY: SRO~

EVALUATION SETTING/METHOD: Classroom/Perform

REFERENCES:

HC.OP-DL.ZZ-0026 Rev. 153 TOOLS, AND EQUIPMENT: HC.OP-DL.ZZ-0026; HC.OP-IS.BD-0001 ESTIMATED COMPLETION TIME: - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A

-- - - Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME:

- - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A

-- - - Minutes REASON IF UNSATISFACTORY:

EVALUATOR: DATE:

Signature Page 1of10

JOB PERFORMANCE MEASURE SYSTEM: Conduct of Operations TASK NUMBER: 4010010201 TASK: Complete the Daily Surveillance Logs INITIAL CONDllTONS:

1. The Plant is in OPCON 1 at 35% power
2. A plant startup from a forced outage is in progress IAW HC.OP-IO.ZZ-0003.
3. RCIC IST is in progress and being turned over.
4. River level is at 96.1 feet due to recent heavy rains.
5. River temperature is 83 degF but is NOT expected to exceed 85 degF.
6. All EDGs, SACS, and SSW pumps are operable.
7. The SPV Effluent RMS Skid (all components) is inoperable and has been CIT for repairs.

INITIATING CUE:

You are the Control Room Supervisor.

IMPLEMENT the log at the beginning of today by completing Attachment 1, Section A; Log Initiation, IDENTIFYING those Attachments that require performance due to the present conditions.

Page 2of10

JPM NUMBER: ~~~~~~~~~~

ZZ017 NAME: ~~~~~~~~~~~~~~~~~

REV NUMBER: 04 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

CUE: PROVIDE the operator the initiating cue; a paper copy of HC.OP-DL.ZZ-0026; Attachment 1 of HG.OP-DL.ZZ-0026; AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.

START TIME:

If requested, provide copy of HC.OP-IS.BD-0001.

Operator determines beginning Operator determines correct step of the procedure. beginning step to be 2.1.

2.1 Shift Manager/Control Room Supervisor - the SM/CRS is responsible to implement, review, and ensure completion of the log including (CRS has primary responsibility for all log reviews and documentation):

2.1.1 The SM/CRS shall Examiner Note: Examiner Copy implement the log at the Exhibit 1 is provided for reference. '

beginning of each day by completing Attachment 1, Operator determines Attachment 1 Section A; Log Initiation, is required due to current listing those Attachments Operational Condition.

that require performance due to present conditions. Also, the present Operational Condition shall be listed.

Operator checks Attachment 1 on Attachment 1 Section A Log Initiation.

Operator determined Attachment 3m is required due to RCIC IST adding heat to the Suppression Pool.

  • operator checks Attachment 3m on Attachment 1 Section A Log Initiation.

Operator determines Attachment 3k is required IAW Item 1 and T/S 4.7.3 due to current River Water level.

  • operator checks Attachment 3k on Attachment 1 Section A Log Initiation.

Page 3of10

JPM NUMBER: ZZ017 NAME:

REV NUMBER: 04 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)

Operator determines Attachment 3h is required IAW Item 1 and T/S 4.7.1.3.b.1 due to current River Water temperature.

  • operator checks Attachment 3h on Attachment 1 Section A Log Initiation.

Operator determines Attachment 3t is required IAW Item 42 due to SPV RMS Inoperable.

  • operator checks Attachment 3t on Attachment 1 Section A Log Initiation.

Operator places a "1" in the Operational Condition blank.

Operator determines Attachment 3z is required for tracking purposes.

Operator checks Attachment 3z on Attachment 1 Section A Log Initiation.

Operator checks Attachment 5 on Attachment 1 Section A Log Initiation.

Examiner Note: Although not specifically required by the current conditions, Attachment 5 is typically used each day to track surveillance procedures and would be needed the first time a surveillance procedure with an action time is actually logged on.

CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Task Standard: Operator implements the log at the beginning of the day by completing Attachment 1, Section A, of HC. OP-DL.ZZ-0026.

@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]

Page 4of10

JOB PERFORMANCE MEASURE STATION: Hope Creek 2016 NRC EXAM

  • Copy _ _ of _ _

SRO-JPM A2 SYSTEM: Administrative TASK NUMBER: 2990750302 TASK: Ensure The Operating Shift Is Adequately Manned JPM NUMBER: 305H-JPM.ZZXXX REVISION: 00 SAP BET: NOH05JPZZXXE KIA NUMBER: 2.1.5 Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.

(CFR: 41.10 I 43.5 I 45.12)

IMPORTANCE FACTOR: RO: 2.9 SRO: 3.9 ALTERNATE PATH: D APPLICABILITY: SRO~

EVALUATION SETTING/METHOD: Classroom/Perform

REFERENCES:

OP-AA-105-102, Rev. 11 TOOLS, AND EQUIPMENT: OP-AA-105-102 ESTIMATED COMPLETION TIME: 6

--- - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:

- -N/A- - - Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME:

- - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME:

- -N/A- - - Minutes REASON IF UNSATISFACTORY:

EVALUATOR: DATE:

Signature Page 1of8

JOB PERFORMANCE MEASURE SYSTEM: Administrative TASK NUMBER: 2990750302 TASK: Ensure The Operating Shift Is Adequately Manned INITIAL CONDllTONS:

1. John Smith is in the process of license re-activation for the Control Room Supervisor position in accordance with OP-AA-105-102, NRC Active License Maintenance. Refer to the provided OP-AA-105-102, Attachment 2.
2. The Operations Training Manager has signified that the license holder is current in the Requal Program and Completion of plant-specific activation guide.
3. The License Coordinator has verified that medical/respiratory protection qualifications are current.
4. SRO John Smith and the Operations Support Manager have verified that the license holder is compliant with

& concurs with restrictions on current NRC license.

5. SRO John Smith has completed the following:
  • Main Control Room Tour: Completed with a current CRS on July 3, 2016
  • Turbine Building Tour: Completed with the on watch SM on July 14, 2016
  • Reactor Building Tour: Completed with a current NCO on July 15, 2016
  • Station Service Water and Yard Tour: Completed with the on watch Yard Equipment Operator on July 20, 2016
  • Auxiliary Building Tour: Completed with a Current CRS on August 4, 2016.
  • Reviewed Shift Turnover responsibilities I procedure.
6. SRO John Smith completed the Hours on Shift as shown.

INITIATING CUE:

Today is August 23, 2016.

PERFORM the Shift Manager review of the OP-AA-105-102, Attachment 2, for John Smith's SRO license renewal for the Control Room Supervisor position.

COMPLETE the review AND SIGN the attachment, IF appropriate, OR LIST all gaps that require resolution before the form can be signed.

Page 2 of 8

JPM NUMBER: ~~~~~~~~~-

ZZXXX NAME: ~~~~~~~~~~~~~~~~~

REV NUMBER: 00 DATE:

STANDARD COMMENTS STEP SAT/

ELEMENT (*Critical Step) (Required for NUMBER UNSAT

(#Sequential Step) UNSAT)@

CUE: PROVIDE the operator: the initiating cue, a copy of OP-AA-105-102; the marked up Attachment 2 of OP-AA-105-102; AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.

START TIME:

OP-AA-105-102 4.2.3. DOCUMENT the reactivation on Attachment 2, Reactivation of License Log . *operator reviews the

1. The Shift Manager shall Attachment 2 and the Initial signify that the required Conditions. The operator OJT hours were identifies that not all tours were completed. completed with an ACTIVE SRO license holder.
  • operator reviews the Attachment 2 and the Initial

' Conditions. The operator identifies that the watch hours stood as the CRS ONLY [20 hours total] could be used towards the 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of watchstanding requirements.

  • Operator does NOT sign as the Shift Manager.

CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Task Standard: Operator determines license reactivation requirements have not been met in accordance with OP-AA-105-102.

@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]

Page 3 of 8

JOB PERFORMANCE MEASURE STATION: Hope Creek 2016 NRC EXAM Copy _ _ of _ _

SRO-JPM A3 SYSTEM: Administrative TASK NUMBER: WCD_CRS_001 TASK: Perform WCD Review and Pre-Approval JPM NUMBER: 305H-JPM.ZZXXX REVISION: 00 SAP BET: NOH05JPZZXXE K/A NUMBER: 2.2.41 Ability to obtain and interpret station electrical and mechanical drawings.

(CFR: 41.10 I 45.12 I 45.13)

IMPORTANCE FACTOR: RO: 3.5 SRO: 3.9 ALTERNATE PATH: D APPLICABILITY: ROD SRO~

EVALUATION SETTING/METHOD: Classroom/Perform

REFERENCES:

OP-AA-109-115, Rev. 9 M-51-1 Sheet 2, Rev. 44 TOOLS, AND EQUIPMENT: M-51-1Sheet1and2, Rev. 50/44 [Large size]; OP-AA-109-115, Rev. 9; Technical Specifications,.Amendment 199 ESTIMATED COMPLETION TIME: 16

--- - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:

- -N/A- - - Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME:

- - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON IF UNSATISFACTORY:

EVALUATOR: DATE:

Signature Page 1of11

JOB PERFORMANCE MEASURE SYSTEM: Administrative TASK NUMBER: WCD_CRS_001 TASK: Perform WCD Review and Pre-Approval INITIAL CONDllTONS:

1. The plant is operating at OPERATIONAL CONDITION 1.
2. The Core Spray, ADS, HPCI and RCIC systems are OPERABLE.
3. BC-HV-FOO?C, OP/V131 RHR PMP C MIN FL VLV, requires internal repair work.
4. SAP is unavailable.

INITIATING CUE:

You are the licensed Authorizing Supervisor designated to review and approve Work Clearance Documents (WCDs). You have been presented with the WCD for Independent Review and Pre-Approval in accordance with OP-AA-109-115, Safety Tagging Operations.

PERFORM the following:

1. Independently check that the WCD adequately isolates the equipment to be worked.

NOTE: Electrical breaker numbers are NOT required to be identified. Additionally, the type of tag (Red blocking Tag, Worker Blocking Tag, etc.), and the sequence of blocking points, are NOT required to be identified.

2. REVIEW Technical Specifications for applicable Limiting Conditions for Operation (LCOs):
  • IDENTIFY AND ENTER ON THE WCD ONLY those Technical Specifications required to be entered (ACTIVE) when the system is to be placed in this configuration.
  • Of the LCOs entered, IDENTIFY the most limiting.
3. PRE-APPROVE the WCD; ORJE changes are required, THEN IDENTIFY/ENTER the changes on theWCD.

Page 2of11

JPM NUMBER: zzxxx NAME:

REV NUMBER: 00 DATE:

STANDARD COMMENTS STEP SAT/

ELEMENT (*Critical Step) (Required for NUMBER UNSAT

(#Sequential Step) UNSAT)@

CUE: PROVIDE the operator the initiating cue; M-52-1, sheets 1 and 2; OP-AA-109-115; marked up OP-AA-109-115 FORMS 1 AND 4; AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue.

START TIME:

Operator determines beginning Operator determines correct step of the procedure. beginning step to be 4.2.3.

4.2.3. Perform WCD Independent Operator reads Step.

Review and Pre-Approval (Approving Supervisor)

1. The Approving Supervisor shall be designated by the Operations Director to approve WCDs.

NOTE: Independence is maintained as Operator reads NOTE.

follows:

  • Do not discuss the clearance with the clearance writer until the approving supervisor has developed his or her own idea of the clearance boundary
  • Use appropriate references (procedures, drawings, manuals, planning documents, etc.)
  • Separately assess an.d understand the work scope
  • Separately assess and understand the hazards
  • Separately walk down the work area, if needed
  • Mark up prints from a clean copy, especially for clearances on complex equipment where no historical/archived clearance is referenced
  • Do not read the draft boundary tag list until the above is complete
2. The Initiator and Approving Operator reads Step.

Supervisor shall be different individuals and independent. At least one individual must be a currently licensed SRO.

[CD-538E]

Page 3of11

JPM NUMBER: zzxxx NAME:

~----------------

REV NUMBER: 00 DATE:

STANDARD COMMENTS STEP SAT/

ELEMENT (*Critical Step) (Required for NUMBER UNSAT

(#Sequential Step) UNSAT)@

3. Perform the following: Examiner Note: Only specific

- Review applicable portions of 4.2.3.3 are being documents and performed.

drawings.

- Independently check *operator: Reviews M-52-1 and that the WCD the WCD; Determines that H1 BC adequately isolates the BC-V205 in the closed equipment to be position needs to be added to worked. the WCD; Adds this information to the WCD.

Examiner Note: Tagging Point Description is NOT critical.

CUE: !f operator requests additional information to complete the Tagging Point Description, STATE exact description is not required at this time.

Review applicable *operator lists the following Limiting Conditions for Technical Specification on the Operation (LCO) and WCD:

ensure that potential Technical Specification

  • TS 3.6.2.3 Action Statements are Action a.-One suppression identified. pool cooling loop inoperable -

72 hr. LCO Examiner Note: The following Technical Specifications may be listed by are NOT critical:

3.5.1.b; 3.6.2.2; 3.6.2.3; 3.6.3; 3.3.7.4; and 3.3.7.5.

4. !E changes are required, Operator does NOT sign for THEN return the tagging approval, and returns the package.

package to the Initiator.

CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME: - - - - - - -

Task Standard: Operator completes the required portions of the Approving Supervisor's Independent Review of the WCD in accordance with OP-AA-109-115.

@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]

Page 4of11

JOB PERFORMANCE MEASURE STATION: Hope Creek 2016 NRC EXAM Copy _ _ of _ _

RO/SRO-JPM A4 SYSTEM: Administrative TASK NUMBER: 4000270401 TASK: Respond To An Abnormal Release Of Gaseous Radioactivity JPM NUMBER: 305H-JPM.ZZ019 REVISION: 04 SAP BET: NOH05JPZZ19E K/A NUMBER: 2.3.11 Ability to control radiation releases. (CFR: 41.11 I 43.4 I 45.10)

IMPORTANCE FACTOR: RO: 3.8 SRO: 4.3 ALTERNATE PATH: D APPLICABILITY: RO~ SRO~

EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-AB.CONT-0004, Rev. 6 HC.OP-DL.ZZ-0026, Rev. 152 TOOLS, AND EQUIPMENT: Calculator ESTIMATED COMPLETION TIME: Minut~s TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A

-- - - Minutes REASON IF UNSATISFACTORY:

EVALUATOR: DATE:

Signature Page 1 of 10

JOB PERFORMANCE MEASURE SYSTEM: Administrative TASK NUMBER: 4000270401 TASK: Respond To An Abnormal Release Of Gaseous Radioactivity INITIAL CONDllTONS:

1. North Plant Vent (NPV) Stack radiation monitoring activity was rising on RM-11 point 9RX590.
2. SPDS is unavailable.
3. HC.OP-AB.CONT-0004 is being executed to determine and stop the release of activity.
4. NPV Exh Flow instrumentation channel 9AX300 is inoperable. Flow is being estimated in accordance with HC.OP-DL.ZZ-0026(Q), Attachment 3u (Provided).
5. Monitor Item 136 display is 001.

INITIATING CUE:

DETERMINE the Release Rate of NOBLE GAS from the NPV in accordance with HC.OP-AB.CONT-0004, Action A.4.

Page 2of10

JPM NUMBER: ~~~~~~~~~~

ZZ019 NAME:

REV NUMBER: 04 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)

CUE: PROVIDE the operator the initiating cue; HC.OP-DL.ZZ-0026(0), Attachment 3u; AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.

START TIME:

Operator obtains the correct Operator obtains procedure procedure. HC.OP-AB.CONT-0004.

Operator determines beginning Operator determines correct step of the procedure. beginning step to be A.4 A.4 DETERMINE the Total Release Operator determines that to Rates of Noble Gas and Iodine calculate the Noble Gas release as follows: from the NPV the formula in Table "A" must be used.

  • USE the SPDS Noble Gas Total.

OR

  • USE one of the Formulas in Table "A". I IF the emuent (µCi/see) channel on the RM-11 is NOT operatmg for a specJfJc plant vent, THEN CALCULATE the Noble Gas release rate for that vent usin 0.1g.
3. The earthquake was felt inside the Main Control Room.
4. Control Room Annunciator C6-C4 (SEISMIC MON PNL C673) is in alarm.
5. ON Panel 1OC673:
  • The SMA-3 Event Indicator is White.
  • The Strong Motion Accelerograph Tape Machines have advanced but are not currently running.
  • The AMBER alarm light on the Seismic Switch Power Supply Drawer is lit.
6. Numerous amber lights and 3 red lights are lit on the response Seismic Response Spectrum Annunciator.
7. A LOCA results. The Reactor is successfully scrammed, with RPV level dropping rapidly to -250"; then stabilizing between -225" and -205, and being maintained using all available ECCS (2 LPCI Loops only).
8. Drywell Pressure peaked at 44 psig, then dropped to < 2 psig over the next 90 seconds, and continues to slowly drop.
9. The current 33 ft. elevation wind direction is from 163° at 11 mph.
10. Plant Effluent activity is:
  • 1.17E+01 µCi/sec Noble Gas
  • 1.1 ?E-02 µCi/sec 1-131
11. DAPA monitors indicate:
  • 2.000E+OO DAPA A
  • 1.500E+OO DAPA B INITIATING CUE:

Based on this information, CLASSIFY this event AND MAKE the initial notifications.

This is a time critical task, and has two time critical elements.

Time zero for the event is NOW.

Page 2of16

JPM NUMBER: ~~~~~~~~~~

ECG006 NAME: ~~~~~~~~~~~~~~~~~

REV NUMBER: 10 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

CUE: PROVIDE the operator the initiating cue AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue.

START TIME:

EP-HC-111-101 8.4 Classification N/A N/A N/A NOTE Comparison of redundant Operator reads Note.

instrumentation, indications, and/or alarms should be used to confirm actual plant conditions.

The primary tools for Operator reads text.

determining the emergency classification level are the EAL flowcharts or EAL wallcharts.

The user of the EAL flowcharts or wallcharts may (but is not '

required to) consult the EAL Technical Basis in order to obtain additional information concerning the EALs under classification consideration. To use the EAL flowcharts or wallcharts, follow this sequence:

1. ASSESS the event and/or Operator assesses the initial plant conditions and conditions, and determines that DETERMINE which ECG - EALs that are applicable under all EAL Group/Section is most plant Operational Conditions appropriate. (OPCONs), AND EALs applicable only under hot OPCONs apply to this classification.
2. REVIEW EAL categories Operator assesses the initial and subcategories on the conditions, and determines that H, appropriate and R, are appropriate ECG flowcharts/wallcharts. categories; and H1, and R1 are appropriate subcategories.

Page 3of16

JPM NUMBER: ECG006 NAME:

REV NUMBER: 10 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

3. If using the ECG - EAL Operator refers to Flowchart flowcharts, for each Diagrams and/or Wallcharts and applicable subcategory, reviews EALs in H1, and R1.

REVIEW EALs in the subcategory beginning with Operator determines that HA 1.1 ,

the lowest emergency and HU1 .1 apply to the event.

classification level to the highest classification level (left to right). ENSURE all pages of a particular subcategory being considered are reviewed.

4. If using the ECG - EAL Wallcharts, for each applicable subcategory, REVIEW EALs in the subcategory beginning with the highest emergency classification level to the lowest classification level

' (left to right).

5. If in OPCON 1, 2 or 3, also REVIEW the Fission Product Barrier (FPB)

Table:

a. EXAMINE the FPB Operator examines the FPB categories in the left categories in the left column of the column of the table. table.
b. SELECT the category Operator selects categories RPV that most likely Level; and RPV/Drywell Pressure coincides with event /Temperature/H2 & 02 Levels most conditions. likely coincide with event conditions.
c. REVIEW all thresholds Operator reviews all thresholds in in this category for each of the categories identified in each fission product 5.b for each fission product barrier, barrier. and determines FB1 .L, RB1 .L, RB2.L, and CB1 .L apply to this event.

Page 4of16

JPM NUMBER: ~~~~~~~~~~

ECG006 NAME:

REV NUMBER: 10 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

d. For each threshold that Operator proceeds to the FPB is exceeded, IDENTIFY Table to determine the point values its point value and and classification level.

DETERMINE the classification level in accordance with the instructions on the Fission Product Barrier Table (or in EAL Technical Bases, Attachment 1).

Hope Creek-Fission Product Barrier Table NOTE1 The Primary Containment Operator reads NOTE.

Barrier should not be declared lost or potentially lost based on exceeding Technical Specification action statement criteria, unless there is an event in progress requiring '

mitigation by the Primary Containment barrier. When no event is in progress (Loss or Potential Loss of either Fuel Clad and/or RCS barrier) the Primary Containment Barrier status is addressed by Technical Specifications.

Page 5of16

JPM NUMBER: ECG006 NAME:

REV NUMBER: 10 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT Use of Fjssion Product Barrier Table A point system is used lo dotennine the Emergency Classification Level based on the Fission Product Barrier Table. Each Fission Product Barrier Loss and Poteotial loss threshold is assigned a point value as noted below.

Perform the IOllowing

1. Review all columns of the Fission Product Barrier Table and identify which need further review.
2. For each of the three barriers, detem1ine the EAL with the highest point value. No more than one EAL should be selected for each barrier Operator identifies the point values
3. Add the point values for the three barriers.

FB1 .L = 5 points, RB1 .L(OR

4. Classify based on the point value sum as follows.

RB2.L) =5 points, and CB1 .L = 3 points.

R.~f@rto Ms:um Emergency Acbon levels {EAls) ECG ATT#

  • operator adds the values, for a total of:
. 3 13 points - General Emergency.

Examiners Note: Determining this value for future use is critical; marking it on the FPB Table is not.

$l7E AREA \...oss or po~tal lass EMERGENCY c' ANY - barn""

1--0SS r:l ANY two C-ENE?.A:.. l>arni"">-

EME?GENCY AliQ Loss Page 6of16

JPM NUMBER: ECG006 NAME: ~~~~~~~~~~~~~~~~~

REV NUMBER: 10 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

EP-HC-111-101

6. REVIEW the associated Operator reviews the EALs EALs as com pared to the identified in Step 8.4.3 and 4, and event and SELECT the selects EAL HA 1.1 as the highest highest appropriate emergency action level met or emergency. If identification exceeded (ALERT). However, the of an EAL is questionable classification determined by the refer to paragraph 8.1 FPB Table (GENERAL above. EMERGENCY) is the highest.

If there is any doubt with regard to assessment of a particular EAL, the ECG EAL Technical Bases Document should be reviewed. Words contained in an EAL that appear in uppercase and bold print (e.g., VALID) are defined at the end of the bases for the particular EAL or i~ ECG -

EAL Technical Basis Document, Attachment 3, EP-HC-111-232, EAL Definitions. Words or numbers contained in an EAL that are in bold print but not uppercase are EAL threshold values (e.g., ; ,: : 15 minutes).

7. If an EAL has been Examiner Note: Filling out the exceeded, equal level NRG Data Sheet is beyond the EALs or lower level EALs scope of this JPM.

are not required to be seperately reported as long as the applicable N/A information is communicated to the NRG using ECG Attachment 5, EP-HC-111-F5, NRC Data Sheet & Completion Reference.

Page 7of16

JPM NUMBER: ECG006 NAME:

REV NUMBER: 10 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

8. When the Shift Manager Operator requests STA/IA (SM) is the Emergency verification of classification.

Coordinator, the Shift Technical Advisor (STA} is Examiner Note: Due to time spent responsible to perform an assessing and/or nature of JPM independent verification of administration, Operator may not the EAL classification. The request verification.

STA verification does not alleviate the requirement of the SM to make a timely classification. Should the SM fill the STA role, independent verification of the EAL classification will be delegated to another on-shift SRO, the Independent Assessor.

CUE: IF the Operator requests the STA/IA to independently verify the EAL Classification, THEN INFORM the Operator the STA/IA is not available.

9. IDENTIFY and Operator identifies and implements IMPLEMENT the EP-HC-111-F4, and refers to EP-referenced ECG form HC-111-102 as a guide for correct based on the Emergency description wording for entry on the Classification Level. ICMF for all EALs.
  • Un:..1sual Event lmpletn'nt EP*+IC 111 .f 1
  • Alert lmp!ernent EP*tiC, l l 1-F2
  • site Area Emergency lmplemenl EP-HC-l 11-F3
  • General E:.mergency lmpfen1ent [P.HC-111-r~
  • unusual Event (Common Site) Implement EP-HC-111-F24 REFER to EP-HC-111-102, Hope Creek Emergency Classification Description Table, as a guide for correct description wording for entry on the Initial Contact Message Form (ICMF) for all EALs.

EP-HC-111-F4 ATTACHMENT 4 GENERAL EMERGENCY A. CLASSIFICATION

1. CALL communicators to Operator calls communicators to the Control Room. the Control Room and initials Step.

CUE: After 2 minutes, report as the Primary and Secondary Communicators.

Page 8of16

JPM NUMBER: ECG006 NAME: ~~~~~~~~~~~~~~~~~

REV NUMBER: 10 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

2. IF a Security Event is in Operator determines Step is not progress, THEN applicable and marks Step N/A.

IMPLEMENT the prompt actions of NC.EP-EP.ZZ-0102, EC Response, Attachment 10, prior to classification.

3. If time allows, DIRECT Operator requests STA/IA Classification Independent verification of classification and Verification to be initials Step.

performed Examiner Note: Due to time spent assessing and/or nature of JPM administration, Operator may not request a verification.

CUE: IF the Operator requests the STA/IA to independently verify the EAL Classification, THEN INFORM the Operator the STA/IA is not available.

4. ; After Classification Operator commences filling out Independent Verification ICMF and initials Step.

is obtained:

  • operator declares a General
  • DECLARE the Emergency, places time and GENERAL date in the appropriate spots in the EMERGENCY (enter ICMF, time and date on ICMF) and initials the step as the EC.

Examiners Note: NOTE the declaration time that the operator entered on the ICMF. The difference between the START TIME and the "DECLARED AT" TIME is the first critical time (15 min).

Time:

Page 9of16

JPM NUMBER: ECG006 NAME: ~~~~~~~~~~~~~~~~-

REV NUMBER: 10 DATE:

I

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

  • COMPLETE I *operator places the EAL #(s):

APPROVE the ICMF FB1.L, RB1.L(OR RB2.L) and CB1 .L, a description of the event, checks NO Release in progress, enters the wind direction and speed, determines PAR, and initials as EC in the appropriate spots in the ICMF, and initials the step as the EC.

Examiners Note: See the attached ICMF for an example of what the form should look like when filled out properly. Note that the exact words do not have to be in the "DESCRIPTION OF EVENT", but the description must convey the sense of the Initiating Condition for EALs FB1 .L, RB1 .L(OR RB2.L),

and CB1 .L. The operator may place the Examiner.'s name as the Communicator, or tell the Examiner to place his/her name as the Communicator.

5. If time allows OBTAIN Operator requests ST A/IA perform accuracy peer check of the an accuracy peer check of the completed ICMF completed ICMF.

CUE: IF the Operator requests the STA/IA to perform an. accuracy peer check of the completed ICMF, THEN INFORM the Operator the STA/IA is not available.

6. Continue with NOTIFICATION AND ACTIVATION as follows: Operator activates the ERO per posted instructions titled Training
  • If not previously Use Emergency Callout Activation performed, ACTIVATE and initials Step.

I DIRECT ACTIVATION of ERO Examiner Note: ENSURE the Emergency Callout operator is using the Simulator (EP 96-003) Training Activation instructions.

CUE: If asked/requested to activate the ERO Emergency Callout, STATE "The ERO Callout is complete."

Page 10of16

JPM NUMBER: ECG006 NAME: ~~~~~~~~~~~~~~~~-

REV NUMBER: 10 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

  • DIRECT the Primary *operator provides the ICMF to Communicator to Primary Communicator and implement ECG directs implementation of Att.6 Attachment 6 and initials Step.

Examiner Note: The difference between the "DECLARED AT" TIME and this LOG TIME is the second critical time (13 min.).

Time:

CUE: Role-play as Primary Communicator and repeat back the directions given.

  • DIRECT the Secondary *operator directs CM2 to Communicator to implement Att. 8 for a GENERAL implement ECG EMERGENCY Attachment 8 for a GENERAL and initials Step.

EMERGENCY CUE: Role-play as Secondary Communicator and repeat back the directions given. Provide Terminating Cue.

CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Task Standard: Operator declares a General Emergency in accordance with EALs FB1 .L, RB1 .L(OR RB2.L), and CB1 .L; initiates a PAR; and makes notifications within identified Critical Times in accordance with EP-HC-111-101.

@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]

Page 11of16

JOB PERFORMANCE MEASURE STATION: Hope Creek 2016 NRC EXAM Copy _ _ of _ _

JPMA SYSTEM: Control Rod and Drive Mechanism TASK NUMBER: 4000040401 TASK: Respond To An Uncoupled Control Rod JPM NUMBER: 305H-JPM.BF011 REVISION: 04 SAP BET: NOH05JPBF11 E KIA NUMBER: 201003 A2. Ability to (a) predict the impacts of the following on the CONTROL ROD AND DRIVE MECHANISM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:

(CFR: 41.5 I 45.6)

A2.02 Uncoupled rod IMPORTANCE FACTOR: RO: 3.7 SRO: 3.8 ALTERNATE PATH: C8J APPLICABILITY: RO C8J SRO C8J EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-ST.BF-0001 Rev. 31 HC.OP-AB.IC-0001 Rev. 16 TOOLS, AND EQUIPMENT: None ESTIMATED COMPLETION TIME: 33

--- - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: - -N/A ---

Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: - - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME: - -N/A ---

Minutes REASON IF UNSATISFACTORY:

EVALUATOR: DATE:

Signature Page 1of14

JOB PERFORMANCE MEASURE SYSTEM: Control Rod and Drive Mechanism TASK NUMBER: 4000040401 TASK: Respond To An Uncoupled Control Rod INITIAL CONDllTONS:

1. The Plant is operating at 100% power.
2. Maintenance was performed on the position indication circuit of rod 38-03
3. The maintenance is complete.
4. As part of the retest requirements, performance of HC.OP-ST.BF-0001 Control Rod Drive Exercise - Weekly is required for control rod 38-03 only.
5. The "ON DUTY" Reactor Engineer has been notified that control rod 38-03 will be exercised IAW HC.OP-ST.BF-0001.
6. Use CRIDS for OD-7 control rod positions.
7. The Reactor Engineer has approved exercising rod 38-03 at 100% power.
8. Stall flows are NOT required.
9. HC.OP-ST.BF-0001, retest for control rod 38-03, has been entered in the Control Room log.

INITIATING CUE:

EXERCISE control rod 38-03 IAW HC.OP-ST.BF-0001.

Page 2of14

JPM NUMBER: BF011 NAME: ~~~~~~~~~~~~~~~~~

REV NUMBER: 04 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

CUE: PROVIDE the operator the initiating cue, marked-up copy of HC.OP-ST.BF-0001, AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue.

START TIME:

Operator reviews precautions Operator reviews precautions and and limitations. limitations.

CUE: IF excessive time is taken reviewing precautions and limitations, THEN INFORM operator that all are satisfied.

Operator determines beginning Operator determines correct step of the procedure. beginning step to be 5.1.

5.1 LOG test start time in the Operator requests the procedure Control Room log(s). be logged in the Control Room log and initials Step.

CUE: The start time for HC.OP-ST.BF-0001 for retest of rod 38-03 only, has been logged in the Control Room log.

5.2 ENSURE all prerequisites of Operator ensures that all Section 2.0 are satisfied. prerequisites have been satisfied and initials Step.

CUE: If excessive time is taken reviewing prerequisites, inform operator that all are satisfied.

5.3 ENSURE Attachment 1, Operator observes Attachment 1, Section 1.0 has been Section 1.0 has been completed completed AND Regular AND Retest is indicated and initials Surveillance OR Retest is Step.

indicated.

5.4 OBTAIN a computer printout of Operator displays OD-7 from the current Control Rod GRIDS terminal and initials Step.

positions. (e.g. OD-7)

CUE: Provide operator printout of OD-7 from CRIDS.

5.5 OBSERVE proper response of Operator reviews the requirement the Nuclear Instrumentation to observe proper response of the while withdrawing OR inserting Nuclear Instrumentation while all Control Rods. withdrawing OR inserting all Control Rods and initials Step.

5.6 SELECT the next Control Rod *#Operator presses ROD AND RECORD or verify the SELECT MODULE 38-03 initial Control Rod position on pushbutton Attachment 2.

and initials Step.

Page 3of14

JPM NUMBER: BF011 NAME: ~~~~~~~~~~~~~~~~~

REV NUMBER: 04 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

5.7 lE Control Rod is at position 00, Operator determines that this step RECORD final Control Rod is N/A and marks Step N/A.

position on Attachment 2. All other blocks are N/A for this rod.

5.8 OBSERVE approximately 6 Operators observes approximately gpm total flow through both the 6 gpm total flow through both the insert AND withdraw Stabilizing insert AND withdraw Stabilizing Valves as indicated on CRID's Valves as indicated on CRID's point 82117. [70044199] point B2117 and initials Step.

NOTE The following two steps will Operator reads NOTE and initials exercise the 1-BF-V138, Note.

Cooling Water Header Check Valve, as required by TIS 4.0.5.

If a "failed position" is encountered when a single notch insertion is attempted, an alternate position may be selected to insert the rod, provided that guidance is obtained from Reactor Engineering. In this situation the remarks section of Attachment 3 should document the alternate position utilized.

5.9 INSERT the selected Control *#operator momentarily Rod one notch (or as directed presses the ROD MOTION by Reactor Engineering) AND CONTROLS INSERT pushbutton PERFORM the following: [T/S 4.1.3.1.2, TIS 4.1.3.7] and initials Step.

5.9.1 ENSURE proper operation of Operator observes the CONTROL the RPIS. ROD POSITION FOUR ROD DISPLAY, RWM, or GRIDS indicates control rod movement to position 46 and initials Step.

5.9.2 lE a Control rod is inadvertently Operator determines that this step positioned at other than the is N/A and marks Step N/A.

desired position, THEN IMPLEMENT the associated guidance contained in the Reactor Engineering Weekly Guidance AND CONTACT Reactor Engineering.

Page 4of14

JPM NUMBER: ~~~~~~~~~-

BF011 NAME:

REV NUMBER: 04 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)(@

5.9.3 lE the control rod does not Operator determines that this step insert to the next notch after is N/A and marks Step N/A.

one attempt, PERFORM the following: ...

5.9.4 INDICATE the condition of Operator then indicates the RPIS RPIS indication on Attachment indication is SAT on Attachment 2

2. and initials Step.

5.10 IF the position recorded in Step Operator determines the position 5.6 is an intermediate position, recorded in Step 5. 7 is NOT an THEN PERFORM Step 5.10.1, intermediate position, continues at OTHERWISE, GO TO Step step 5.10.2 and initials Step.

5.10.2 to return the control rod to its original position: ...

NOTE IF drive water pressure was Operator reads NOTE and increased to withdraw a control determines the NOTE is not rod from position 46, the same applicable and initials NOTE.

or slightly higher pressure should be used to perform the '

uncoupling check. [80009340]

Control Rods experiencing coupling problems should be single-notched to 48 (with settle) prior to using continuous withdraw to verify coupling.

5.10.2 WITHDRAW the control rod to *#Operator simultaneously . ,

position 48 AND PERFORM presses AND holds both the the following while giving the WITHDRAW pushbutton AND the selected Control Rod a CONTINUOUS WITHDRAW continuous withdraw signal: pushbutton

[T/S 4.1.3.6, T/S 4.1.3.7]

and initials Step.

A. OBSERVE the following as indication of the Control Rod being coupled:

1. ROD OVERTRAVEL alarm Operator observes OHA C6-F3 does NOT annunciate. ROD OVERTRAVEL DOES annunciate. CRIDS C071, ROD OVERTRAVEL, in alarm.

Operator releases both the WITHDRAW pushbutton AND the CONTINUOUS WITHDRAW pushbutton.

2. Red Full Out light Operator observes the red FULL illuminates on the Full Core OUT light on the Full Core Display Display. EXTINGUISHES.

Page 5of14

JPM NUMBER: BF011 NAME:

REV NUMBER: 04 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

3. RPIS indicates the Control Operator observes RPIS does Rod is full out (48). indicate position 48 on OD-7.

However, indicates 49, in alarm, on CRIDS page 249.

4. Proper response of the Operator recognizes the expected Nuclear Instrumentation response of the Nuclear while withdrawing the Instrumentation while withdrawing Control Rod. the Control Rod.

Examiner Note: The expected response for a rod from 46 to 48 is negligible.

B. INDICATE on Attachment 2 the Operator indicates the coupling condition of Coupling Check. check is UNSAT on Attachment 2.

NOTE Stall flows need to be taken at Operator reads NOTE and initials least each month. Stall flows NOTE.

should be recorded the first

' time this test is performed each month OR as requested by System Engineer.

C. PERFORM the following for Based on the Initial Conditions, stall flow: ... Operator determines Stall Flow is NOT required. Operator marks the step N/A.

D. lE the CRD over travels, THEN Operator informs the CRS of IMPLEMENT HC.OP-AB.IC- uncoupled control rod and entry 0001(0), Control Rod. condition into HC.OP-AB.IC-0001 and initials Step.

CUE: Acknowledge the report, and DIRECT the Operator to implement Condition D of HC.OP-AB.IC-0001.

HC.OP-AB.IC-0001 CONDITION D, Uncoupled Rod AND Movement Permitted by the RWM NOTE 1 1. Tech Spec 3.1.3.6 has a 2 Operator reads NOTE 1.

hour time limit associated with it.

D.1 OBTAIN Reactor Engineering Operator requests Reactor guidance to recouple the Engineering guidance to recouple Control Rod. the Control Rod and initials Step.

CUE: INFORM the Operator that Reactor Engineer's guidance in NOT available.

Page 6of14

JPM NUMBER: BF011 NAME: ~~~~~~~~~~~~~~~~-

REV NUMBER: 04 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

D.2 lE Reactor Engineering Operator determines step D.2 is guidance CANNOT be applicable and initials Step.

obtained, THEN RECOUPLE the Control Rod as follows:

a. INSERT the CRD no more Operator single notch inserts rod than 2 notches from the 38-03 to position 46 (no more than point of discovery. position 44) using INSERT PB and initials Step.

Examiner Note: Due to the rod being at Overtravel, it will take two single notch insertions to insert the rod to 46. The first insertion will settle the rod at 48 and may bring in OHA C6 E3 ROD DRIFT. IF ROD DRIFT alarm comes in, THEN operator will respond using OHA C6-E3 Alarm Response Procedure and determine rod 38-03 caused the alarm.

b. Single Notch WITHDRAW *#operat~r single notch the Control Rod to its withdraws rod 38-03 to position original position AND 48.

VERIFY expected response. Operator observes correct response of the control rod and initials Step.

c. PERFORM a coupling Operator requests copy of HG.OP-check on the associated ST.BF-0001.

control rod IAW ST.BF-0001.

CUE: Provide operator 2nd marked up copy of HC.OP-ST.BF-0001 IF requested.

HC.OP-ST .BF-0001 5.10.2 WITHDRAW the control rod to *#Operator simultaneously position 48 AND PERFORM presses AND holds both the the following while giving the WITHDRAW pushbutton AND the selected Control Rod a CONTINUOUS WITHDRAW continuous withdraw signal: pushbutton.

[T/S 4.1.3.6, T/S 4.1.3.7)

A. OBSERVE the following as indication of the Control Rod being coupled: Operator observes OHA C6 F3 ROD OVERTRAVEL does NOT

1. ROD OVERT RAVEL alarm annunciate and initials Step.

does NOT annunciate.

Page 7of14

JPM NUMBER: BF011 NAME: ~~~~~~~~~~~~~~~~~

REV NUMBER: 04 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

2. Red Full Out light Operator observes the red FULL illuminates on the Full Core OUT light on the Full Core Display Display. illuminates and initials Step.
3. RPIS indicates the Control Operator observes RPIS indicates Rod is full out (48). the Control Rod is full out (48) and initials Step.
4. Proper response of the Operator recognizes the expected Nuclear Instrumentation response of the Nuclear while withdrawing the Instrumentation while withdrawing Control Rod. the Control Rod and initials Step.

Examiner Note: The expected response for a rod at 48 is negligible.

B. INDICATE on Attachment 2 the Operator indicates the coupling condition of Coupling Check. check is SAT on Attachment 2 and initials Step.

Examiner Note: Operator may '

initial D.2.c or HC.OP-AB.IC-0001 at this time.

HC.OP-AB.IC-0001 CONDITION D, Uncoupled Rod AND Movement Permitted by the RWM D.3 RESTRICT all further Operator informs the CRS that all withdrawals of this rod to further withdrawals of this rod Single Notch movement until should be restricted to Single repairs have been completed. Notch movement until repairs have been completed.

CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Task Standard: Operator exercises, and re-couples, control rod 38-03 IAW HC.OP-ST.BF-0001.

@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L1-11-3 Rec. 3b]

Page 8of14

JOB PERFORMANCE MEASURE STATION: Hope Creek 2016 NRC EXAM Copy _ _ of _ _

JPM B SYSTEM: Feedwater TASK NUMBER: 2590120101 TASK: Place The First RFPT In Service JPM NUMBER: 305H-JPM.AE005 REVISION: 10 SAP BET: NOH05JPAE05E KIA NUMBER: 259001 A4. Ability to manually operate and/or monitor in the control room:

(CFR: 41.7 / 45.5 TO 45.8)

A4.02 Manually start/control a RFP/TDRFP IMPORTANCE FACTOR: RO: 3.9 SRO: 3.7 ALTERNATE PATH: D APPLICABILITY: RO~ SRO~

EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-SO.AE-0001 Rev. 72 TOOLS, AND EQUIPMENT: None ESTIMATED COMPLETION TIME: - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: - - N/A

- - Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME:

- - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME: - - N/A

- - Minutes REASON IF UNSATISFACTORY:

EVALUATOR: DATE:

Signature Page 1of10

JOB PERFORMANCE MEASURE SYSTEM: Feedwater TASK NUMBER: 2590120101 TASK: Place The First RFPT In Service INITIAL CONDllTONS:

1. A plant startup from cold shutdown is in progress IAW HC.OP-IO.ZZ-0003.
2. Reactor Pressure is approximately 500 psig.
3. AP101 and BP101 RFPs are on Recirc IAW Section 5.3 of HC.OP-SO.AE-0001.
4. Startup level control is in AUTO Reactor Vessel level control.
5. Chemistry is ready to place Condensate Polisher Vessels in service as required.

INITIATING CUE:

PLACE Reactor Feed Pump AP101 in service in Manual control in accordance with 5.4 of HC.OP-SO.AE-0001.

Page 2of10

JPM NUMBER: ~~~~~~~~~~

AE005 NAME:

REV NUMBER: 10 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)

CUE: PROVIDE the operator the initiating cue AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue.

START TIME:

Operator obtains and locates Operator obtains the correct procedure HC.OP-SO.AE- procedure.

0001.

Operator reviews precautions Operator reviews precautions and and limitations. limitations.

CUE: IF excessive time is taken reviewing precautions and limitations, THEN INFORM operator that all are satisfied.

Operator determines beginning Operator determines correct step of the procedure. beginning step to be 5.4.

5.4.1 ENSURE all prerequisites of Operator ensures that all Section 2.4 are satisfied. prerequisites have been satisfied, and initials Step. '

CAUTION Opening the HV-1769A{B,C) Operator reads and initials REACTOR FEED PUMP CAUTION.

A(B,C) DISCH STOP CHK VLV MOT OPER completes the RFP start logic. IF adequate SCP(s) are NOT in service, a RFP trip will occur. (REFER to Attachment 1.)

5.4.2 ENSURE HV-1769A(B,C), *#Operator opens HV-1769A, REACTOR FEED PUMP A(B,C) DISCH STOP CHK VLV and initials Step.

MOT OPER, is open.

NOTE Placing the initial Reactor Feed Operator reads and initials NOTE.

Pump in service will cause a transient on the pump rotating assembly. Vibration and/or axial displacement alarms are possible immediately after placing the pump in service, and are expected to clear after the pump is in service and the discharge pressure is stable.

Page 3of10

JPM NUMBER: ~~~~~~~~~-

AE005 REV NUMBER: ~~~~~~~~~-

10

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)

CAUTION Reactor Feed Pump Turbine Operator reads and initials Critical Speed is approximately CAUTION.

3400 rpm.

Operation in the range of 3250 rpm to 3550 rpm should be minimized.

5.4.3 PRESS RFPT A(B,C) SPEED *#operator presses RFPT A CTRLR SPD DEMAND INC i SPEED CTRLR SPD DEMAND pushbutton as required to INC i pushbutton as required to establish approximately 150 to establish approximately 150 to 450 psid across the Startup 450 psid across the Startup Valves to achieve positive Valve, response on the startup valves.

and initials Step.

5.4.4 CLOSE HV-1772A(B,C), RFPT *operator closes HV-1772A, A(B,C) STEAM LOW PRESSURE SUPPLY STOP and initials Step.

VLV BELOW SEAT DRAIN MOV.

5.4.5 CLOSE HV-1786, RFP *#Operator closes HV-1786, BYPASS STOP VLV.

and initials Step.

NOTE For RFP Turbine speed ;::: 5000 Operator reads and initials NOTE.

rpm increase the RFPT RECIRC FLOW CTRL A{B,C) setpoint to 4500 gpm.

If possible, maintain RFP DISCH Press such that level control is accomplished via LV-1785. Valve differential pressure of < 450 psid should be attempted to be maintained.

CAUTION Carefully monitor for vessel Operator reads and initials level swings AND RFPT CAUTION.

hunting when controlling differential pressure across the S/U valves in AUTO AND below 900 psig RX Pressure.

Page 4of10

JPM NUMBER: AE005 NAME:

~--------- ~----------------

REV NUMBER: 10 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)

Examiner Note: Operator may 5.4.6 CONTROL the differential adjust A RFP speed again to pressure across the startup ensure dp in the range of 150 to valves automatically or 450 psid.

manually by performing the following: Operator reads and initials Step.

A. MANUAL

1. Intermittently PRESS RFPT A(B,C) SPEED CONTROLLER SPD DEMAND INC I OR DEC ! pushbutton as necessary to maintain RFP discharge press above Reactor pressure to allow Startup Valve to Control Reactor Vessel level.

CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME: - - - - - - -

Task Standard: Operator places AP101 Reactor Feed Pump in service in Manual control in accordance with HC.OP-SO.AE-0001.

Page 5of10

JOB PERFORMANCE MEASURE STATION: Hope Creek 2016 NRC EXAM Copy _ _ of _ _

JPMC SYSTEM: Integrated Operating Procedures TASK NUMBER: 30002090101 TASK: Perform a Cooldown Using Bypass Valves JPM NUMBER: 305H-JPM.AC008 REVISION: 01 SAP BET: NOH05JPAC08E K/A NUMBER: 241000 A4. Ability to manually operate and/or monitor in the control room:

(CFR: 41. 7 I 45.5 TO 45.8)

A4.02 Reactor pressure IMPORTANCE FACTOR: RO: 4.1 SRO: 4.1 ALTERNATE PATH: D APPLICABILITY: RO~ SRO~

EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-IO.ZZ-0004, Rev. 100 TOOLS, AND EQUIPMENT: None ESTIMATED COMPLETION TIME: 16 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: - -N/A ---

Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: - - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME: _ _N_;_/A _ _ Minutes REASON IF UNSATISFACTORY:

EVALUATOR: DATE:

Signature Page 1of10

JOB PERFORMANCE MEASURE SYSTEM: Integrated Operating Procedures TASK NUMBER: 30002090101 TASK: Perform a Cool down Using Bypass Valves INITIAL CONDllTONS:

1. A plant shut down is in progress for a refueling outage.
2. HC.OP-IO.ZZ-0004 has been implemented through Step 5.1.48.

INITIATING CUE:

COMMENCE a Reactor Cooldown and Depressurization to 530 psig in accordance with Step 5.2.1.B of HC.OP-IO.ZZ-0004: Another operator will plot cooldown rate.

Page 2of10

JPM NUMBER: AC008 NAME: ~~~~~~~~~~~~~~~~~

REV NUMBER: 01 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

CUE: PROVIDE the operator the initiating cue AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.

START TIME:

Operator obtains procedure Operator obtains the correct HC.OP-IO.ZZ-0004. procedure.

Operator reviews precautions Operator reviews precautions and and limitations. limitations, and initials each one.

CUE: If excessive time is taken reviewing precautions and limitations, inform operator that all are satisfied.

2.0 PREREQUISITES ENSURE all personnel who are Operator completes Attachment 1, to perform any step(s) in this Section 1.0, prior to performing any procedure have completed part of this procedure, and initials Attachment 1, Section 1.0, prior Step.

to performing any part of this '

procedure.

Operator determines beginning Operator determines correct step of the procedure. beginning step to be 5.2.1.B.

NOTE Steam Loads, Decay Heat, and Operator reads and initials NOTE.

Feed will directly affect Cooldown I Depressurization.

Impact of these variables, ,,

regardless of DEHC Control mode selected, MUST be continuously evaluated for impact on the cooldown.

The cooldown rate should be limited to 60°F per hour when above 200 psig to preclude RWCU flashing.

At approximately 200 psig reactor pressure, the cooldown rate should be limited to approximately 30° F/hr to prevent excessive cavitation of the RWCU pump.

Page 3of10

JPM NUMBER: AC008 NAME:

REV NUMBER: 01 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)(a) 5.2.1. CONTINUE/MAINTAIN a cooldown rate of::; 60°F/hr using Rx Cooldown mode, Pressure Control mode OR Bypass Valve Manual Jack as follows:

A. Establish PRESSURE Operator determines and marks CONTROL as ... this Step as N/A.

NOTE When Rx Cooldown mode is Operator reads and initials NOTE.

initiated with a bypass valve open, a minor Pressure Rise will occur. This pressure rise should be anticipated when placing Rx Cooldown controller in service.

Any cooldown that has occurred since the shutdown must be considered prior to

' establishing Rx Cooldown mode in determining initial cooldown so as NOT to exceed 60°F/hr.

Once Rx Cooldown mode is established, the INTENT is to remain on the Rx Cooldown controller for the duration of the Cooldown I Depressurization.

An In-Progress Cooldown can be interrupted to support plant manipulations without exiting the Rx Cooldown mode by establishing the temperature Setpoint at the desired hold point on the Cooldown Controller.

5.2.1.B. B. IF desired, Establish *#operator selects !control! ,

REACTOR COOLDOWN and IRX Cooldown I.

as follows:

and initials Step.

1. SELECT IControll ,

IRX Cooldownl

2. SELECT jRamp Rat~ *#operator selects !Ramp Rat~

AND ENTER desired and enters a desired rate that rate not to exceed 60 does not exceed 60 deg F/hr, deg F/hr.

and initials Step.

Page 4of10

JPM NUMBER: ~~~~~~~~~-

AC008 NAME: ~~~~~~~~~~~~~~~~-

REV NUMBER: 01 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

3. SELECT [em~erature/ *#operator selects tfemperatur~

AND ENTER desired and enters a value for the temperature. desired temperature, and initials Step.

Examiner Note: Desired temperature is approximately 470F

t20F.
4. SELECT Reactor *#operator selects Reactor Cooldown /ON/ AND Cooldown /ON/,

VERIFY Rx Cooldown Controlling indication is verifies Rx Cooldown Controlling observed. indication is observed, and initials Step.

5. MAINTAIN Throttle Operator maintains Throttle Pressure Set, Pressure Pressure Set, Pressure Setpoint Setpoint approximately approximately 50-100 psig above 50-100 psig above Throttle Pre?"sure not to exceed Throttle Pressure not to 905 psig, and initials Step.

exceed 905 psig.

Examiner Note: Pressure Setpoint is currently 905 psig.

CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Task Standard: Operator establishes a cooldown in accordance with Step 5.2.1.B of HC.OP-10.ZZ-0004.

@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]

Page 5of10

JOB PERFORMANCE MEASURE STATION: Hope Creek 2016 NRC EXAM Copy _ _ of _ _

JPM D SYSTEM: High Pressure Coolant Injection TASK NUMBER: 2060180201 TASK: Place HPCI in Full Flow Test Operation JPM NUMBER: 305H-JPM.BJ014 REVISION: 04 SAP BET: NOH05JPBJ14E KIA NUMBER: 206000 A4. Ability to manually operate and/or monitor in the control room:

(CFR: 41. 7 I 45.5 TO 45.8)

A4.06 Reactor pressure: BWR-2,3,4 IMPORTANCE FACTOR: RO: 4.3 SRO: 4.3 ALTERNATE PATH: [8J APPLICABILITY: RO [8J SRO [8J EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-AB.ZZ-0001, Rev 31 TOOLS, AND EQUIPMENT: None ESTIMATED COMPLETION TIME: - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: -- N/A

- - Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: ----

Minutes ACTUAL TIME CRITICAL COMPLETION TIME: ----

N/A Minutes REASON IF UNSATISFACTORY:

EVALUATOR: DATE:

Signature Page 1of13

JOB PERFORMANCE MEASURE SYSTEM: High Pressure Coolant Injection TASK NUMBER: 2060180201 TASK: Place HPCI in Full Flow Test Operation INITIAL CONDllTONS:

1. The Reactor has scrammed due to a spurious Group 1 isolation.
2. All control rods are full in.
3. RCIC has automatically initiated on low reactor water level and is injecting to the RPV.
4. HPCI has automatically initiated on low reactor water level.
5. Reactor water level is currently approximately-10 inches and slowly rising.
6. RHR Loop Bis in Suppression Pool Cooling.
7. Another operator is controlling RPV level and pressure.

INITIATING CUE:

PLACE HPCI into the Full Flow Test Mode in order to commence a plant cooldown in accordance with HC.OP-AB.ZZ-0001 (Q), Attachment 6.

The simulator will remain in FREEZE until you are ready to start the task.

Page 2of13

JPM NUMBER: ~~~~~~~~~-

BJ014 NAME: ~~~~~~~~~~~~~~~~-

REV NUMBER: 04 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

CUE: PROVIDE the operator the initiating cue, ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue AND states ready to begin.

START TIME:

CUE: PLACE the simulator in RUN, and inform the Operator that the simulator is in RUN.

Operator obtains and locates Operator obtains the correct procedure. procedure.

NOTE Loss of 1AD481, 1CD481, Operator reads and initials NOTE.

1AD482, or 1CD482 may affect controls and indication.

Operator determines beginning Operator determines correct step of the procedure. beginning step to be 2.0 on page 6 of 6.

2.0 lE HPCI is in the Injection Mode of Operati,an, THEN PERFORM the following:

A. IF necessary, RESET HPCI *operator depresses the RESET INITIATION LOGIC. HPCI INITIATION LOGIC pushbutton, and initials Step.

B. ADJUST FIC R600 HPCI Operator observes zero %

FLOW setp~int (STPT) to indication is reached on FIC-R600, zero% and initials Step.

Examiner Note: Setpoint is already at zero%.

C. WHEN FLOW indicates *operator observes zero gpm is zero gpm THEN CLOSE reached, and depresses the HV-F006. CLOSE pushbutton for HV-F006, and initials Step.

Examiner Note: HPCI flow is currently zero gpm.

D. CLOSE HV-8278. *operator depresses the CLOSE pushbutton for HV-8278, E. ENSURE HPCI AND RCIC Operator observes HPCI AND Suctions are lined up to the RCIC Suctions are lined up to the CST. CST. (OPEN lights for BJ-HV-F004 and BD-HV-F010 are illuminated) and initials Step.

Page 3of13

JPM NUMBER: BJ014 NAME: ~~~~~~~~~~~~~~~~~

REV NUMBER: 04 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

F. PRESS HV-F008 INCR PB *operator depresses the INCR for == 20 seconds pushbutton for approximately 20 seconds and observes the OPEN light illuminate, resulting in dual indication for the FOOS, and initials Step.

Examiner Note: Any timing method is acceptable, as the time requirement is "approximately" 20 seconds.

G. OPEN AP-HV-F011. *operator depresses the AP-HV-F011 OPEN pushbutton, and initials Step.

Examiner Note: Pressing the AP-HV-F011 pushbutton will activate ET-1, starting a slow rise in Suppression Pool water level. I H. ADJUST FIC-R600 *operator depresses the Raise setpoint to achieve 3000 and/or Lower Setpoint gpm flow. Pushbutton(s) until HPCI flow indicates approximately 3000 gpm on FIC-R600, and initials Step.

Examiner Note: WHEN Suppression Pool Water Level reaches 78.5 inches, Overhead Annunciator B1-C3 SUPPRESSION POOL LEVEL HI/LO alarm and HPCI suction transfer occur. Performance of the next Step may/may not be observed.

J. THROTTLE HV-F008 AND Operator throttles and adjusts FIC-ADJUST FIC-R600 R600 setpoint, as necessary, up to setpoint, as necessary, up and including full flow rate, to to and including full flow control HPCI pump parameters/

rate, to control HPCI pump reactor pressure.

parameters/reactor pressure.

Page 4of13

JPM NUMBER: BJ014 NAME: ~~~~~~~~~~~~~~~~~

REV NUMBER: 04 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

Operator identifies HPCI Suction Swap is occurring based on OHA B1-C3 and HPCI Pump suction auto-transferring from the CST (HV-F004) to the Torus (HV-F042).

Operator announces 'Suppression Pool Level Hi(/Lo)', and informs CRS.

Examiner Note: The following actions may be performed by the Operator using the guidance from HC.OP-AB.ZZ-0001, Attachment 6 section for HPCI Suction Transfer to CST without/prior to direction from the CRS based on the direction in step 1.0 of that section.

Operator identifies the need to perform HC.OP-AB.ZZ-0001, Attachment 6 section for HPCI Suction Transfer to CST and take the required actions from that section.

I CUE: IF necessary, DIRECT the Operator to transfer HPCI suction back to the CST and place HPCI in Full Flow Test mode to continue plant cooldown in accordance with HC.OP-AB.ZZ-0001.

Loss of 1AD481 may affect Operator reads and initials NOTE.

controls and indication.

1.0 lE a HPCI Suction Transfer has occurred while in Full Flow Test, OR HPCI is in Full Flow *operator depresses the Lower Test AND a Suction Swap is Setpoint Pushbutton until zero anticipated, THEN PERFORM gpm flow indication is reached the following: on FIC-R600, A. ADJUST FIC R600 Flow and initials Step.

Setpoint to zero gpm.

B. lE required, CLOSE AP- Operator may depress the CLOSE HV-F011. Pb for AP-HV-F011, and initials Step.

Examiner Note: Valve will auto close when BJ-HV-F042 is full open.

C. WHEN Suction Swap to Operator observes position Suppression Pool is indication and when the CST completed, (HV-F042 Suction valve HV-F004 indicates OPEN, HV-F004 and AP- CLSD and the Torus Suction valve HV-F011 are CLOSED) HV-F042 indicates open, and THEN PROCEED in this initials Step.

Attachment.

Page 5of13

JPM NUMBER: BJ014 NAME: ~~~~~~~~~~~~~~~~-

REV NUMBER: 04 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@,

2.0 PRESS HV-F042 AUTO OPEN *operator depresses the OVRD OVRD Pushbutton AND Pb for HV-F042, VERIFY the HV-F042 OVRD Light is LIT. and initials Step.

3.0 IF a HPCI Initiation Signal is Operator identifies that the HPCI present, THEN PERFORM the Initiation Signal is NOT present, following: marks Step as N/A, and proceeds to Step 4.0.

Examiner Note: The initiation signal was reset during the initial actions to place HPCI in Full Flow Test.

4.0 IF a HPCI Initiation Signal is NOT present, THEN PERFORM the following: *operator depresses the HV-A. PRESS the HV-F042 F042 CLOSE Pb, CLOSE Pushbutton and initials Step.

B. WHEN HV-F042 indicates Operator observes both the OPEN dual position, THEN OPEN and CLSD lights are illuminated for HV-F004. HV-F042,

  • operator depresses the HV-F004 OPEN Pb, and initials Step.

CUE: IF the CRS is asked about restoring HPCI to full flow test, DIRECT the Operator to restore HPCI to the Full Flow Test mode to continue plant cooldown.

5.0 !E required, RESTORE HPCI to *operator depresses the Raise Full Flow Test as follows: and/or Lower Setpoint A. ADJUST FIC-R600 HPCI Pushbutton(s) until HPCI flow FLOW setpoint to 1000 setpoint indicates approximately gpm. 1000 gpm on FIC-R600, and initials Step.

B. IMMEDIATELY OPEN AP- *operator depresses the AP-HV-HV-F011. F011 OPEN pushbutton, and initials Step.

Page 6of13

JPM NUMBER: ~~~~~~~~~-

BJ014 NAME: ~~~~~~~~~~~~~~~~-

REV NUMBER: 04 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

C. WHEN Discharge Pressure WHEN HPCI discharge pressure turns ADJUST FIC-R600 begins to lower, Operator setpoint to 3000 gpm. depresses the Raise and/or Lower Setpoint Pushbutton(s) until HPCI flow setpoint indicates approximately 3000 gpm on FIG-R600, and initials Step.

Examiner note: The termination statement by the Operator may be a report to the CRS that HPCI is in Full Flow Test mode of operation.

At that time it is acceptable to terminate the JPM.

D. THROTTLE HV-F008 AND Operator throttles and adjusts FIG-ADJUST FIC-R600 R600 setpoint, as necessary, up to setpoint, as necessary, to and including full flow rate, to control HPCI pump control HPCI pump parameters/

parameters/reactor reactor pressure.

pressure.

CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Task Standard: Operator places HPCI in Full Flow Test mode and returns to Full Flow Test mode after HPCI Suction Transfer to CST in accordance with HC.OP-AB.ZZ-0001.

@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]

Page 7of13

JOB PERFORMANCE MEASURE STATION: Hope Creek 2016 NRC EXAM Copy _ _ of _ _

JPM E SYSTEM: Residual Heat Removal TASK NUMBER: 4000400401 TASK: Respond To A Loss Of Shutdown Cooling JPM NUMBER: 305H-JPM.BC003 REVISION: 09 SAP BET: NOH05JPBC03E K/A NUMBER: 205000 A2. Ability to (a) predict the impacts of the following on the SHUTDOWN COOLING SYSTEM (RHR SHUTDOWN COOLING MODE); and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR: 41.5 I 45.6)

A2.06 SDC/RHR pump trips IMPORTANCE FACTOR: RO: 3.4 SRO: 3.5 ALTERNATE PATH: D APPLICABILITY: RO~ SRO~

EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-AB.RPV-0009, Rev. 11 TOOLS, AND EQUIPMENT: None ESTIMATED COMPLETION TIME: --- 8 - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: -- N/A- - Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: - - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A

-- - - Minutes REASON IF UNSATISFACTORY:

EVALUATOR: DATE:

Signature Page 1of9

JOB PERFORMANCE MEASURE SYSTEM: Residual Heat Removal TASK NUMBER: 4000400401 TASK: Respond To A Loss Of Shutdown Cooling INITIAL CONDllTONS:

1. The plant was is OPCON 4.
2. The reactor has been shut down for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />.
3. RHR Pump B was in shutdown cooling at 10,000 gpm for several days.
4. RCS temperature was 120F.
5. A worker inadvertently tripped the RHR Pump B breaker locally.
6. The breaker has been inspected and is undamaged.
7. The Shutdown Cooling suction line did NOT isolate.
8. NSSSS and PCIS are reset.
9. The pump has been tripped for 5 minutes.
10. HC.OP-AB.RPV-0009 Shutdown Cooling is being implemented.

INITIATING CUE:

PERFORM Condition A, Steps A.5 and A.6, of HC.OP-AB.RPV-0009.

The required shutdown cooling flow for the 'B' RHR pump is between 9500 -10,000 gpm.

Page 2of9

JPM NUMBER: ~~~~~~~~~-

BC003 NAME: ~~~~~~~~~~~~~~~~-

REV NUMBER: 09 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

CUE: PROVIDE the operator the initiating cue AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue.

START TIME:

Operator obtains and locates Operator obtains the correct .

procedure HG.OP AB.RPV- procedure.

0009.

Operator determines beginning Operator determines correct step of the procedure. beginning step to be A.5.

A.5 ENSURE the following:

  • HV-F008, HV-F009 and Operator determines the HV-F008, HV-F006A(B) are OPEN. (If HV-F009, and HV-F006B are open necessary, dispatch by observing the red OPEN lights operators to operate are illuminated and green CLSD manually). lights are extinguished, and initials

[CD-065X] Step.

  • HV-F006B(A) and HV- Operator determines the HV-FOO? A(B) are CLOSED. F006A is closed by observing the red OPEN lights are extinguished and green CLSD lights are illuminated, and initials Step.

A.6 RESTORE tripped RHR pump *#operator presses the HV-as follows: F015B DECR pushbutton until

a. CLOSE F015A(B). the OPEN light extinguishes, and initials Step.
b. RESTART RHR Pump *#operator presses the BP202 A(B). START push button, observes the RUNNING indicator illuminates and the STOPPED indicator extinguishes, and initials Step.
c. IMMEDIATELY *#operator presses HV-F015B THROTTLE OPEN INCR pushbutton until Shutdown F015A(B) to establish Cooling flow is between 9500 Shutdown Cooling flow gpm and 10,000 gpm, between 3000 gpm and 10,000 gpm. and initials Step.

Page 3 of 9

JPM NUMBER: ~~~~~~~~~-

BC003 NAME: ~~~~~~~~~~~~~~~~-

REV NUMBER: 09 0 ATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Task Standard: Operator performs Steps A.5 and A.6 of HC.OP-AB.RPV-0009.

@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]

Page 4of9

JOB PERFORMANCE MEASURE STATION: Hope Creek 2016 NRC EXAM Copy _ _ of _ _

JPM F SYSTEM: System TASK NUMBER: 3620190101 TASK: Shift A 4160 V 1E Bus To Alternate Feeder JPM NUMBER: 305H-JPM.PB001 REVISION: 00 SAP BET: NOH05JPPB01 E K/A NUMBER: 262001 A4.01 IMPORTANCE FACTOR: RO: 3.4 SRO: 3.7 ALTERNATE PATH: ~

APPLICABILITY: RO~ SRO~

EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-SO.PB-0001, Rev. 29 TOOLS, AND EQUIPMENT: None ESTIMATED COMPLETION TIME:

- - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A

-- - - Minutes REASON IF UNSATISFACTORY:

EVALUATOR: DATE:

Signature Page 1of10

JOB PERFORMANCE MEASURE SYSTEM: System TASK NUMBER: 3620190101 TASK: Shift A 4160 V 1E Bus To Alternate Feeder INITIAL CONDllTONS:

1. Maintenance is required on the 40201 breaker.

INITIATING CUE:

SHIFT 10A402 supply to the Alternate Feeder Breaker in accordance with Section 5.6 of HC.OP-SO.PB-

. 0001.

Page 2of10

JPM NUMBER: PB001 NAME: ~~~~~~~~~~~~~~~~~-

REV NUMBER: 00 DATE:

STANDARD COMMENTS STEP SAT/

ELEMENT (*Critical Step) (Required for NUMBER UNSAT

(#Sequential Step) UNSAT)@

CUE: PROVIDE the operator the initiating cue AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.

START TIME:

Operator obtains and locates Operator obtains the correct procedure. procedure.

Operator reviews precautions Operator reviews precautions and and limitations. limitations.

CUE: IF excessive time is taken reviewing precautions and limitations, THEN INFORM operator that all are satisfied.

Operator determines beginning Operator determines correct step of the procedure. beginning step to be 5.6.1 .

NOTE The Normal (Alternate) Feeder Operator reads and initials NOTE.

Breaker should have the AUTO CLOSE BLOCK PB set (illuminated) when the breaker ...

5.6.1. ENSURE that the prerequisites Operator completes Attachment 1 of Section 2.6 have been Section 2.0 and ensures that all satisfied. prerequisites have been satisfied, and initials each prerequisite.

CAUTION When transferring the A vital Operator reads NOTE, determines bus, the CRS should it is not applicable, and initials determine ... NOTE.

5.6.2. IF desired, OPEN breakers 52- Operator determines that the Step 212071 and 52-212072 for is not applicable, and marks Step RAGS valves 1EDHV-2598 and as N/A.

1EDHV-2599.

5.6.3. ENSURE Bus Voltage is Operator refers to HC.OP-DL.ZZ-adjusted to the higher band 0003 and determines Bus Voltage required for the Bus alignment adjustment is required, prior to transfer AND if necessary, PLACE 1AX501 *#places 1AX501 Tap Changer (1 BX501) Tap Changer in in Manual and adjusts Bus Manual. (REFER TO HG.OP- Voltage to 4.276 KV - 4.370 KV DL.ZZ-0002(3)(0), Control (CRIDS A7066),

Console Log(s))

and initials Step.

Examiner Note: Operator may also place the 1BX501 Tap Changer in Manual in anticipation of future adjustments.

Page 3of10

JPM NUMBER: ~~~~~~~~~

PB001 REV NUMBER: ~~~~~~~~~

00 STANDARD COMMENTS STEP SAT/

ELEMENT (*Critical Step) (Required for NUMBER UNSAT

(#Sequential Step) UNSAT) 5.6.4. SHIFT breaker alignment on the desired Class 1 E 4160V busses (listed in Table PB-002, Section 5.4) as follows:

Operator observes the Alternate A. lE the Alternate (Normal) AUTO CLOSE BLOCK PB AUTO CLOSE BLOCK PB backlight is OFF, and initials Step.

backlight is ON, THEN PRESS the Alternate (Normal) AUTO CLOSE BLOCK AND VERIFY that the PB backlight is OFF.

[CD-056H]

B. PRESS Normal (Alternate) *#operator presses the 40201 AUTO CLOSE BLOCK AUTO CLOSE BLOCK PB and AND VERIFY that the PB verifies that the PB backlight is backlight is OFF. [CD- OFF, 056H] AND INITIAL Attachment 1. and initials Step.

C. PRESS CLOSE PB on *#operator presses CLOSE PB Alternate (Normal) FEED on Alternate Feed Breaker BRKR.

40208, and initials Step.

D. ENSURE that the Alternate Operator observes the 40208 (Normal) FEED BRKR CLOSE PB backlight is lit, and the closes AND that the TRIP PB is extinguished, and the Normal (Alternate) FEED 40201 CLOSE PB backlight is BRKR trips. AND INITIAL extinguished and the TRIP PB is lit, Attachment 1. and initials Attachment 1.

E. PRESS the AUTO CLOSE *#operator presses the AUTO BLOCK PB for the CLOSE BLOCK PB for the Alternate (Normal) Feed Alternate Feed Breaker 40208, Breaker AND VERIFY that the AUTO CLOSE BLOCK verifies that the AUTO CLOSE PB is illuminated. [CD- BLOCK PB is illuminated, and 056H] AND INITIAL initials Step.

Attachment 1.

5.6.5. ENSURE Bus Voltage is Operator refers to HC.OP-DL.ZZ-adjusted, as necessary, within 0003 and determines Bus Voltage required range. (REFER TO to be within the required range.

HC.OP-DL.ZZ-0002(3)(0),

Control Console Log( s))

Page 4of10

JPM NUMBER: ~~~~~~~~~-

PB001 NAME: ~~~~~~~~~~~~~~~~~

REV NUMBER: 00 DATE:

STANDARD COMMENTS STEP SAT/

ELEMENT {*Critical Step) (Required for NUMBER UNSAT

{#Sequential Step) UNSAT)@

5.6.6. lE opened in Step 5.6.2, Operator determines that this Step CLOSE breakers 52-212071 is not applicable and marks N/A.

and 52-212072 for RAGS isolation valves 1EDHV-2598 and 1EDHV-2599 AND INITIAL Attachment 1.

5.6.7. PERFORM independent Operator provides the procedure verification that the system is for an independent review.

aligned IAW Attachment 1.

CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Task Standard: Operator shifts 10A402 supply to the Alternate Feeder in accordance with HC.OP-SO.PB-0001.

@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]

Page 5of10

JOB PERFORMANCE MEASURE STATION: Hope Creek 2016 NRC EXAM Copy _ _ of _ _

JPMG SYSTEM: Control Area Ventilation System TASK NUMBER: 4880060101 TASK: Isolate the Control Room HVAC System JPM NUMBER: 305H-JPM.GK002 REVISION: 04 SAP BET: NOH05JPGK02E K/A NUMBER: 290003 A4. Ability to manually operate and/or monitor in the control room:

(CFR: 41. 7 I 45.5 TO 45.8)

A4.01 Initiate/reset system IMPORTANCE FACTOR: RO: 3.2 SRO: 3.2 ALTERNATE PATH:~

APPLICABILITY: RO~ SRO~

EVALUATION SETTING/METHOD:

REFERENCES:

HC.OP-AB.HVAC-0002 Rev.10 HC.OP-SO.GK-0001 Rev. 22 TOOLS, AND EQUIPMENT: None ESTIMATED COMPLETION TIME: 7 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A

-- - - Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME:

- - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A

-- - - Minutes REASON IF UNSATISFACTORY:

EVALUATOR: DATE:

Signature Page 1 of 11

JOB PERFORMANCE MEASURE SYSTEM: Control Area Ventilation System TASK NUMBER: 4880060101 TASK: Isolate the Control Room HVAC System INITIAL CONDllTONS:

1. The plant is at 100% power.
2. Control Room Ventilation Train A is in service.
3. The Aux Building Operator has been briefed and is standing by on location.
4. Chiller BK400 is ready for a start.

INITIATING CUE:

SWAP Control Room Ventilation Trains IAW Section 5.4 of HC.OP-SO.GK-0001.

Page 2of11

JPM NUMBER: GK002 NAME: ~~~~~~~~~~~~~~~~~-

REV NUMBER: 04 DATE:

STANDARD COMMENTS STEP SAT/

ELEMENT (*Critical Step) (Required for NUMBER UNSAT

(#Sequential Step) UNSAT)@

CUE: PROVIDE the operator the initiating cue AND ENTER ST ART TIME AFTER Operator repeats back the Initiating Cue.

START TIME:

Operator obtains and locates Operator obtains the correct procedure. procedure.

Operator reviews precautions Operator reviews precautions and and limitations. limitations.

CUE: IF excessive time is taken reviewing precautions and limitations, THEN INFORM operator that all are satisfied.

Operator determines beginning Operator determines correct step of the procedure. beginning step to be 5.4.1.

5.4.1 ENSURE that all prerequisites Operator ensures that all have been satisfied IAW prerequisites have been satisfied Section 2.4. and initials each.

NOTE All operations are performed Operator reads and initials NOTE.

from 1OC651 E unless otherwise noted.

Procedure describes transfer from A Control Chilled Water Loop in service to the B Loop in service, values in parentheses used to transfer back to A in service.

SACS Pump Room Unit Coolers 1AVH214 AND 1BVH214 are interlocked to operate in AUTO only IF Chilled Water Pump AP400 is in service. SACS Pump Room Unit Coolers 1CVH214 and 1DVH214 are interlocked to operate in AUTO only IF Chilled Water Pump BP400 is in service.

Page 3of11

JPM NUMBER: GK002 NAME:

~--------- ~----------------

REV NUMBER: 04 DATE:

STANDARD COMMENTS STEP SAT/

ELEMENT (*Critical Step) (Required for NUMBER UNSAT

(#Sequential Step) UNSAT)@

5.4.2 PRESS CH W CIRC PUMP *operator presses the BP400 B(A)P400 MAN PB. VERIFY MAN PB, MAN comes on.

and observes the MAN push button illuminated and the AUTO push button extinguished.

Examiner Note: Operator may place BP400 in AUTO when proceeding to respond to smoke.

CUE: "REPORT as Yard Operator that there is a large fire north of the HC Million Gallon Fuel Oil Storage Tank and smoke is headed towards the power block."

"Light smoke is coming out of the Control Room ventilation supply ductwork into the Main Control Room.

[SRO] Take any required actions.

[SRO] If requested state, "Implement HC.OP-AB.HVAC-0002 and take any required actions."

CUE: ENSURE ET-1 TRIGGERS; advance Fire Computer, OR PROVIDE Fire Computer Alarm Summary.

HC.OP-AB.HVAC-0002 Operator reviews HC.OP-AB.HVAC-0002 CONTROL ROOM ENVIRONMENT.

EXAMINER NOTE: The directions to HC.OP-AB.HVAC-0002 are contained within HC.OP-AR.QK-0001 (2). The operator may respond to the fire alarm and not go directly to HC.OP-AB.HVAC-0002.

CUE: If operator responds to OHA A2-A5 in accordance with HC.OP-AR.ZZ-0002, and HC.OP-AR.QK-0001 /2, respond as appropriate to implement HC.OP-AB.HVAC-0002 and take any required actions.

I. Smoke OR Toxic Gases are Operator determines Retainment ENTERING the Control Room Override Condition I. applies.

from an Outside source.

Date/Time:

Page 4of11

JPM NUMBER: ~~~~~~~~~-

GK002 NAME: ~~~~~~~~~~~~~~~~~

REV NUMBER: 04 DATE:

STANDARD COMMENTS STEP SAT/

ELEMENT (*Critical Step) (Required for NUMBER UNSAT

(#Sequential Step) UNSAT)@

I.a. PRESS the ISOLATE PB *#operator presses the for the 1/S Control Room ISOLATE PB for the A Control Ventilation Train. Room Ventilation Train.

Operator observes the HD9598A ISOLATE PB for the A Control Room Ventilation Train illuminates.

Operator observes the HD9588M and HD9588BA NORMAL ISOLATED lights are illuminated.

Operator observes the AV400 START PB illuminates, and the STOP PB extinguish.

l.b. PRESS the RECIRC PB for *#Operator presses the RECIRC the l/S CREF Unit. PB for AV400.

Operator observes the OA DMPR HD9593A OPEN PB extinguish and HD9593A CLOSED PB I illuminate.

CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Task Standard: Operator Isolates the Control Room HVAC System in accordance with HC.OP-AB.HVAC-0002.

@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]

Page 5of11

JOB PERFORMANCE MEASURE STATION: Hope Creek 2016 NRC EXAM Copy _ _ of _ _

JPM H SYSTEM: Safety & Turbine Auxiliaries Cooling TASK NUMBER: 3080050101 TASK: Transfer TACS to the Standby SACS Loop JPM NUMBER: 305H-JPM.EG002 REVISION: 13 SAP BET: NOH05JPEG02E 400000 A.4.Ability to manually operate and I or monitor in the control room:

KIA NUMBER: (CFR: 41.7 I 45.5 TO 45.8)

A4.01 CCW indications and control IMPORTANCE FACTOR: RO: 3.1 SRO: 3.0 ALTERNATE PATH: D APPLICABILITY: RO~ SRO~

EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-AB.ZZ-0001, Rev. 31 TOOLS, AND EQUIPMENT: None ESTIMATED COMPLETION TIME: 9

--- - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME:

- - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME:

- -N/A- - - Minutes REASON IF UNSATISFACTORY:

EVALUATOR: DATE:

Signature Page 1of11

JOB PERFORMANCE MEASURE SYSTEM: Safety & Turbine Auxiliaries Cooling TASK NUMBER: 3080050101 TASK: Transfer T ACS to the Standby SACS Loop INITIAL CONDllTONS:

1. The plant is at 100% power.
2. TAGS is being supplied by SACS Loop A.
3. SACS Pump AP210 has developed an oil leak on the inboard pump bearing and there is no oil level in the bubbler.
4. There is no line break in the system.
5. SACS Pump DP210 has been checked for a start.

INITIATING CUE:

TRANSFER TAGS to the B SACS loop IAW HC.OP-AB.ZZ-0001Attachment10 (Hard Card).

STOP SACS Pump AP201.

ENSURE SACS cooling is aligned to the A RHR Heat Exchanger AND secured to the B RHR Heat Exchanger.

There are no additional operators available to assist in the swap.

Page 2of11

JPM NUMBER: ~~~~~~~~~-

EG002 NAME:

REV NUMBER: 13 DATE:

STANDARD COMMENTS STEP SAT/

ELEMENT (*Critical Step) (Required for NUMBER UNSAT

(#Sequential Step) UNSAT)@

CUE: PROVIDE thia operator the initiating cue AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.

START TIME:

Operator obtains procedure Operator obtains the correct HC.OP-AB.ZZ-0001 procedure.

Attachment 10, Page 2 of 2, T ACS TRANSFER TO B LOOP.

Operator determines beginning Operator enters the Date and step of the procedure. Time, and determines correct beginning step to be 1.0.

1.0 IF 'A' Loop TAGS is isolating, Operator determines this step is THEN LOCKOUT: not applicable and marks the Steps N/A.

  • HV-2522 I 2496A
  • HV-2522 I 2496C 2.0 VERIFY no Line Break in the Operator reviews Initiating Cue T ACS System. and/or observes normal SACS Head Tank Levels, and determines no line break exists, and initials Step 3.0 ENSURE B and D SACS Pumps in service, lE required, THEN START the B(D) Pump as follows: Operator observes the SAFETY A. ENSURE REMOTE PB is AUXILIARIES COOLING LOOP B OFF. PUMPS PUMP D REMOTE light is extinguished, and initials Step.

B. PLACE the B(D) Pump in *#operator presses the SAFETY MAN. AUXILIARIES COOLING LOOP B PUMPS PUMP D MAN pushbutton, observes the MAN light illuminates and the AUTO light extinguishes, and initials Step.

Page 3of11

JPM NUMBER: EG002 NAME: ~~~~~~~~~~~~~~~~

REV NUMBER: 13 DATE:

STANDARD COMMENTS STEP SAT/

ELEMENT (*Critical Step) (Required for NUMBER UNSAT

(#Sequential Step) UNSAT)@

C. START the B(D) SACS *#Operator presses the SAFETY Pump. AUXILIARIES COOLING LOOP B I PUMPS PUMP D DP210 START Date/Time pushbutton, observes the PUMP D DP210 START light illuminates and the STOP light extinguishes, enters the Date and Time, and initials Step.

CUE: IF asked for status of 'D' SACS pump after the start, REPORT post start checks are satisfactory.

D. OBSERVE LOW DIFF Operator observes the SAFETY PRESS light extinguishes. AUXILIARIES COOLING LOOP B PUMPS PUMP D LOW DIFF PRESS light is not illuminated, and initials Step.

4.0 ENSURE the following valves *#operator presses the LOOP B are OPEN/OPENING: ISLN TACS CLG/HYDR PNEU ACCUM AIR TACS INBD

  • HV-2522/24968 SPLY/RTN HV 2522B HV 2496B OPEN pushbutton, observes the HV 25228 HV 24968 OPEN light illuminates, and the CLOSE light extinguishes, and initials Step.
  • HV-2522/2496D *#operator presses the LOOP B ISLN TACS CLG/HYDR PNEU ACCUM AIR TACS OUTBD SPLY/RTN HV-25220/HV-24960 OPEN pushbutton, observes the HV 2522D HV 2496D OPEN light illuminates, and the CLOSE light extinguishes, and initials Step.

5.0 WHEN a positive indication is *#operator presses the LOOP A observed that valves in Step ISLN TACS CLG/HYDR PNEU 4.0 are OPEN/OPENING, ACCUM AIR TACS INBD THEN ENSURE the following SPLY/RTN CLOSE pushbutton valves are CLOSED/CLOSING: for HV 2522 HV 2496A,

  • HV-2522 I 2496A observes the CLOSE lights illuminate and the HV 2522A HV 2496A OPEN light extinguishes, and initials Step.

Page 4of11

JPM NUMBER: ~~~~~~~~~

EG002 NAME: ~~~~~~~~~~~~~~~~-

REV NUMBER: 13 DATE:

STANDARD COMMENTS STEP SAT/

ELEMENT (*Critical Step) (Required for NUMBER UNSAT

(#Sequential Step) UNSAT)(a)

  • HV-2522 I 2496C *#Operator presses the LOOP A ISLN TACS CLG/HYDR PNEU ACCUM AIR TACS OUTBD SPLY/RTN CLOSE pushbutton for HV 2522 HV 2496C, observes the CLOSE lights illuminate and the HV 2522C HV 2496C OPEN light extinguishes, and initials Step.

6.0 ENSURE the B AND D SACS Operator observes the SAFETY Pumps are in AUTO. AUXILIARIES COOLING LOOP B PUMPS PUMP B AUTO light is illuminated and MAN light is extinguished,

    1. operator presses the SAFETY AUXILIARIES COOLING LOOP B PUMPS PUMP D AUTO pushbutton, I observes the AUTO light illuminates and the MAN light extinguishes, and initials Step.

7.0 PERFORM the following lE required:

    1. operator presses the A. ADJUST OPEN HV-2512A HV2512A INCR pushbutton until to ==4500 gpm SACS flow flow on Fl- 2511A (CRIDS, or ,,

to "A" RHR Hx. equivalent) indicates ==4500 gpm, and initials Step.

B. CLOSE HV-25128 *#operator presses the HV2512B DECR pushbutton until the HV2512B OPEN light extinguishes and initials Step.

CUE: DIRECT the operator to secure SACS Pump AP210.

C. PLACE the A(C) SACS Operator presses the SAFETY Pump in MAN. AUXILIARIES COOLING LOOP A PUMPS PUMP A MAN pushbutton, and/or observes the MAN light illuminates and the AUTO light extinguishes(d), and initials Step.

EXAMINER NOTE: The pump should have already swapped to MAN.

Page 5of11

JPM NUMBER: ~~~~~~~~~

EG002 REV NUMBER: 13 STANDARD COMMENTS STEP SAT/

ELEMENT (*Critical Step) (Required for NUMBER UNSAT

(#Sequential Step) UNSAT)@

D. STOP the A(C) SACS *#operator presses the SAFETY Pump. AUXILIARIES COOLING LOOP A PUMPS PUMP A STOP pushbutton, observes the PUMP A STOP light illuminates and the AP210 START light extinguishes, and initials Step.

8.0 ENSURE proper Service Water Operator observes that a SSW pump alignment IAW HC.OP- pump is operating in each loop, SO.EA-0001 and initials Step.

CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Task Standard: Operator transfers TACS to SACS Loop Bin accordance with HC.OP-AB.ZZ-0001 Attachment 10.

@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L1-11-3 Rec. 3b]

Page 6of11

JOB PERFORMANCE MEASURE STATION: Hope Creek 2016 NRC EXAM Copy _ _ of _ _

SYSTEM: Reactor Protection JPM I TASK NUMBER: 2120050101 TASK: Transfer RPS Bus A/B Power From Alternate Source To RPS MG Set JPM NUMBER: 305H-JPM.SB015 REVISION: 06 SAP BET: NOH05JPSB1 SE K/A NUMBER: 212000 A2. Ability to (a) predict the impacts of the following on the REACTOR PROTECTION SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:

(CFR: 41.5 I 45.6)

A2.01 RPS Motor-Generator Set Failure IMPORTANCE FACTOR: RO: 3.7 SRO: 3.9 ALTERNATE PATH: ~

APPLICABILITY: RO~ SRO~

EVALUATION SETTING/METHOD: Plant/Simulate

REFERENCES:

HC.OP-SO.SB-0001, Rev 34 TOOLS, AND EQUIPMENT: None ESTIMATED COMPLETION TIME: 12

--- - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: - - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME: - -N/A - - - Minutes REASON IF UNSATISFACTORY:

EVALUATOR: DATE:

Signature Page 1of10

JOB PERFORMANCE MEASURE SYSTEM: Reactor Protection TASK NUMBER: 2120050101 TASK: Transfer RPS Bus A/B Power From Alternate Source To RPS MG Set INITIAL CONDllTONS:

1. The plant is at 100% power.
2. RPS A is being powered from the ALTERNATE A FEED.
3. Maintenance has been completed on 1A-G-401, RPS MG set.
4. Once the MG Set is running, Maintenance needs to check/adjust MG Set output voltage in accordance with Step 5.5.2.D.

INITIATING CUE:

START the 1A-G-401, RPS MG SET A, in preparation to transfer RPS Bus A power from RPS Alternate Transformer A to RPS MG SET A in accordance with Section 5.5 of HG.OP SO.SB 0001.

CONTACT Maintenance when ready for MG set output voltage check/adjust.

Page 2of10

JPM NUMBER: SB015 NAME: ~~~~~~~~~~~~~~~~~

REV NUMBER: 06 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

CUE: PROVIDE the operator the initiating cue AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.

START TIME:

Operator obtains procedure Operator obtains the correct HC.OP-SO.SB-0001. procedure.

Operator reviews precautions Operator reviews precautions and and limitations. limitations.

CUE: If excessive time is taken reviewing precautions and limitations, inform operator that all are satisfied.

Operator determines beginning Operator determines correct step of the procedure. beginning step to be 5.5.1 5.5.1 ENSURE all prerequisites of Operator ensures that all Section 2.5 are satisfied. prerequisites have been satisfied.

CUE: If excessive time is taken reviewing prerequisites, inform operator that all are satisfied.

CUE: IF asked about the current status/indications, state: The Red MOTOR ON lamp is extinguished, and the Green MOTOR OFF lamp is illuminated. The output breaker is open.

5.5.2 lE start of 1A(B)G401, RPS MG Operator determines that this Step Set, is necessary, THEN applies and initials Step.

PERFORM the following (A[B]

MG Set Local Panel):

NOTE IF the MOTOR ON push-button Operator reads and initials NOTE.

is NOT held in for long enough, THEN the starting sequence will NOT be completed. This may result in an undervoltage condition in the generator, which may result in generator damage.

A. PRESS AND HOLD the *#operator presses and holds MOTOR ON push-button the AG401 MOTOR ON push-(Red MOTOR ON lamp button, illuminates).

and initials Step.

CUE: The Red MOTOR ON lamp is illuminated, and the Green MOTOR OFF lamp is extinguished.

Page 3of10

JPM NUMBER: ~~~~~~~~~-

SB015 NAME: ~~~~~~~~~~~~~~~~-

REV NUMBER: 06 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

B. VERIFY A-C VOL TS Operator observes A-C VOL TS Generator Output Voltage Generator Output Voltage and AND PERFORM the EXPECTS a voltage increase to following: 115-125 volts which stabilizes for approximately 5 seconds.

1. IF voltage increases to 115 - 125 volts AND has Following the next Cue, the been stabilized for Operator determines need to approximately 5 seconds, proceed to Step 5.5.2.B.2.

THEN RELEASE the MOTOR ON push-button.

CUE: The meter identified has risen from 0 volts, and has stabilized at approximately 100 volts.

2. IF voltage does NOT increase to 115 - 125 volts, THEN PERFORM *#Operator releases the AG401 the following: MOTOR ON push-button,
a. RELEASE the and initials Step.

MOTOR ON push-button. '

b. PRESS AND HOLD *#Operator presses and holds MOTOR OFF push- the AG401 MOTOR OFF push-button. button, and initials Step.
c. WHEN the MOTOR When the AG401 MOTOR ON light ON light extinguishes, extinguishes, the operator releases THEN RELEASE the the AG401 MOTOR OFF push-MOTOR OFF push- button.

button.

Following the next Cue, the

  • operator releases the MOTOR OFF push-button, and initials Step.

CUE: The Red MOTOR ON lamp is extinguished, and the Green MOTOR OFF lamp is illuminated.

d. REPEAT Step Operator returns to Step 5.5.2.A.

5.5.2.A.

CUE: If asked about restarting the MG Set, inform the operator that one restart attempt is allowed and restart can be attempted while the MG Set is spinning.

Page 4of10

JPM NUMBER: ~~~~~~~~~-

SB015 NAME: ~~~~~~~~~~~~~~~~-

REV NUMBER: 06 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

5.5.2 A. PRESS AND HOLD the *#operator presses and holds MOTOR ON push-button the AG401 MOTOR ON push-(Red MOTOR ON lamp button, illuminates).

and initials Step.

CUE: The Red MOTOR ON lamp is illuminated, and the Green MOTOR OFF lamp is extinguished.

B. VERIFY A-C VOL TS Operator observes A-C VOLTS Generator Output Voltage Generator Output Voltage and AND PERFORM the EXPECTS a voltage increase to following: 115-125 volts which stabilizes for approximately 5 seconds.

1. !E voltage increases to 115 - 125 volts AND has Following the next Cue, the been stabilized for approximately 5 seconds, *#Operator releases the AG401 THEN RELEASE the MOTOR ON push-button, MOTOR ON push-button.

and initials Step.

I CUE: The meter identified has risen from 0 volts, and has stabilized at approximately 120 volts for approximately 5 seconds.

2. !E voltage does NOT Operator determines this step no increase to 115 - 125 longer applies.

volts, THEN PERFORM the following:

C. WHEN 1 minute of MG Set Operator waits one minute, and operation has elapsed, THEN PLACE RPS MG Set *#places the RPS MG Set 1A(B)G401 GENERATOR 1AG401 GENERATOR OUTPUT OUTPUT breaker to ON breaker to ON, AND INITIAL Attachment 1.

initials Attachment 1, and initials the Step.

CUE: The breaker identified is in the stated position.

NOTE The RPS MG Set output voltage shall NOT be set using the local panel meter. Use of the local panel meter ...

Page 5of10

JPM NUMBER: ~~~~~~~~~

SB015 NAME: ~~~~~~~~~~~~~~~~

REV NUMBER: 06 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

D. REQUEST Maintenance Operator requests maintenance to Department to CHECK AND check and adjust if necessary RPS ADJUST (as necessary), the MG Set A output voltage at the RPS MG Set(s) output input to Electrical Protection voltage at the input to Assembly (EPA) Circuit Breaker Electrical Protection 1AN410 (unloaded) IAW HG.MD-Assembly (EPA) Circuit PM.SB-0001 (Q).

Breaker 1AN410 ( 1AN411)

(unloaded) IAW HG.MD-PM.SB-0001 (Q),

OTHERWISE, VERIFY A-C VOL TS at local panel meter is 115 to 125 volts.

CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Task Standard: Operator starts the 1A-G-401, RPS MG SET A, in accordance with Section 5.5 of HG.OP SO.SB-0001.

@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]

Page 6of10

JOB PERFORMANCE MEASURE STATION: Hope Creek 2016 NRC EXAM Copy _ _ of _ _

JPM J SYSTEM: Control Rod Drive Hydraulic TASK NUMBER: 2010090104 TASK: Shift In-Service CRD Stabilizing Valves JPM NUMBER: 305H-JPM.BF002 REVISION: 12 SAP BET: NOH05JPBF02E K/A NUMBER: 201001 A2. Ability to (a) predict the impacts of the following on the CONTROL ROD DRIVE HYDRAULIC SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR: 41.5 I 45.6)

A2.02 Valve closures IMPORTANCE FACTOR: RO: 3.2 SRO: 3.3 ALTERNATE PATH: D APPLICABILITY: RO l:8J SRO l:8J EVALUATION SETTING/METHOD: Reactor Building/Simulate

REFERENCES:

HC.OP-SO.BF-0001 Rev. 34 TOOLS, AND EQUIPMENT: None ESTIMATED COMPLETION TIME: - - - 10 - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: - -N/A - - - Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: - - - - - Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON IF UNSATISFACTORY:

EVALUATOR: DATE:

Signature Page 1of9

JOB PERFORMANCE MEASURE SYSTEM: Control Rod Drive Hydraulic TASK NUMBER: 2010090104 TASK: Shift In-Service CRD Stabilizing Valves INITIAL CONDllTONS:

1. The plant is operating at 80% power.
2. Stabilizing Valves A(B) is in service.
3. Stabilizing Valves A(B) has failed closed due to a malfunction in the Reactor Manual Control System.

INITIATING CUE:

PLACE Stabilizing Valves B(A) in service; SECURE Stabilizing Valves A(B) in accordance with HC.OP-SO.BF-0001, Section 5.2. *

[Evaluator: DETERMINE the in service and standbys Stabilizing Valves based on current plant conditions, AND MODIFY the Initial Conditions and STANDARDS appropriately.]

Page 2of9

JPM NUMBER: ~~~~~~~~~-

BF002 NAME: ~~~~~~~~~~~~~~~~~

REV NUMBER: 12 DATE:

STANDARD COMMENTS STEP SAT/

ELEMENT (*Critical Step) (Required for NUMBER UNSAT

(#Sequential Step) UNSAT)@

CUE: PROVIDE the operator the initiating cue, a marked up copy of HC.OP-SO.BF-0001, AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.

START TIME:

Operator reviews precautions Operator reviews precautions and and limitations. limitations.

CUE: IF excessive time is taken reviewing precautions and limitations, THEN INFORM operator that all are satisfied.

Operator determines beginning Operator determines correct step of the procedure. beginning step to be 5.2.1.

5.2.1 ENSURE all prerequisites of Operator ensures all prerequisites Section 2.2 are satisfied. are satisfied; completes Attachment 1 and initials each prerequisite.

5.2.5 lE Stabilizing Valve B(A) is to *operator simulates rotating the be alternated, THEN 1-BF-V054(1-BF-V071)

PERFORM the following: handwheel in the A. Slowly OPEN 1-BF- counterclockwise direction until V054(1-BF-V071 ), CRD the handwheel reaches full open, Drive Wtr Stabilizing Vlvs and initials Step.

"B(A)" Inlet Viv.

CUE: The handwheel of the valve indicated rotates in the direction indicated and comes to a hard stop.

B. Slowly OPEN 1-BF- *operator simulates rotating the V060(1-BF-V059), CRD 1-BF-V060(1-BF-V059)

Drive Wtr Stabilizing Vlvs handwheel in the "B(A)" Outlet Viv. counterclockwise direction until the handwheel reaches full open, and initials Step.

CUE: The handwheel of the valve indicated rotates in the direction indicated and comes to a hard stop.

C. PRESS (STABILIZER Operator requests that the Control VALVES) VALVE Room press the VAL VE SELECTOR AND VERIFY SELECTOR push button and verify that B(A) VAL VE B(A) VAL VE SELECTED is SELECTED is illuminated. illuminated.

(10C651C)

CUE: Respond as the Control Room, B(A) Valve Selected is illuminated.

Page 3 of 9

JPM NUMBER: BF002 NAME:

REV NUMBER: 12 DATE:

STANDARD COMMENTS STEP SAT/

ELEMENT (*Critical Step) (Required for NUMBER UNSAT

(#Sequential Step) UNSAT)(@,

D. CLOSE 1-BF-V059(1-BF- *#operator simulates rotating V060},CRD Drive Wtr the 1-BF-V059(1-BF-V060)

Stabilizing Vlvs "A(B)" handwheel in the clockwise Outlet Viv. direction until valve handwheel reaches a hard stop, and initials Step.

CUE: The handwheel of the valve indicated rotates in the direction indicated and comes to a hard stop.

E. CLOSE 1-BF-V071 (1-BF- *#operator simulates rotating V054 ), CRD Drive Wtr the 1-BF-V071(1-BF-V054)

Stabilizing Vlvs "A(B)" Inlet handwheel in the clockwise Viv. direction until valve handwheel reaches a hard stop, and initials Step.

CUE: The handwheel of the valve indicated rotates in the direction indicated and comes to a hard stop.

F.' OBSERVE that Operator observes approximately 6 approximately 6 gpm total gpm total flow through both the flow through both the Insert Insert AND Withdraw Stabilizing AND Withdraw Stabilizing valves is indicated on 1BF-Fl-R004 valves is indicated on 1BF- C11, Stabilizing Header Flow Fl-R004 C11, Stabilizing Indicator, and initials Step.

Header Flow Indicator.

CUE: The meter indicates as seen.

G. PERFORM valve lineup Operator completes valve lineup in IAW Attachment 1. accordance with Attachment 1 and requests verification.

CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Task Standard: Operator alternates CRD Hydraulic System Stabilizing Valves in accordance with HC.OP-SO.BF-0001.

@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]

Page 4 of 9

JOB PERFORMANCE MEASURE STATION: Hope Creek 2016 NRC EXAM Copy _ _ of _ _

JPM K SYSTEM: 120 VAC Electrical Distribution TASK NUMBER: 4000020404 TASK: Respond To A Station Blackout JPM NUMBER: 305H-JPM.PN005 REVISION: 00 SAP BET: NOH05JPPN05E K/A NUMBER: 295003AA1. Ability to operate and/or monitor the following as they apply to PARTIAL OR COMPLETE LOSS OF A.C. POWER :(CFR: 41.7 I 45.6)

AA 1.01 A.C. Electrical Distribution System IMPORTANCE FACTOR: RO: 3.7 SRO: 3.8 ALTERNATE PATH: D APPLICABILITY: SRO (8J EVALUATION SETTING/METHOD: Auxiliary Building/Simulate

REFERENCES:

HC.OP-AB.ZZ-0135 Rev. 41 TOOLS, AND EQUIPMENT: HC.OP-AB.ZZ-0135 Equipment stored in the EOP locker in the shift clerks office in the Main Control Room ESTIMATED COMPLETION TIME: - - Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:

- - Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT D ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: Minutes REASON IF UNSATISFACTORY:

EVALUATOR: DATE:

Signature Page 1of11

JOB PERFORMANCE MEASURE SYSTEM: 120 VAC Electrical Distribution TASK NUMBER: 4000020404 TASK: Respond To A Station Blackout INITIAL CONDllTONS:

1. The plant is in OPCON 3.
2. A loss of all offsite and onsite AC power has occurred.
3. HC.OP-AB.ZZ-0135, STATION BLACKOUT //LOSS OF OFFSITE POWER//DIESEL GENERATOR MALFUNCTION is being implemented.

INITIATING CUE:

PERFORM the 30 MINUTE SBO Actions of HC.OP-AB.ZZ-0135, Attachment 1OA, Auxiliary Building Actions For SBO - Operator #1.

This is a Time Critical JPM.

Page 2of11

JPM NUMBER: ~~~~~~~~~-

PN005 NAME: ~~~~~~~~~~~~~~~~-

REV NUMBER: 00 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

CUE: PROVIDE the operator the initiating cue AND ENTER START TIME AFTER Operator repeats back the Initiating Cue.

START TIME:

Operator obtains and locates Operator obtains HG.OP AB.ZZ-procedure. 0135.

Operator determines beginning Operator obtains copy of step of the procedure. Attachment 1OA.

ATTACHMENT 10A, AUXILIARY BUILDING ACTIONS FOR SBO- OPERATOR #1 EQUIPMENT REQUIRED: *#operator obtains equipment (Equipment below is stored in required by Attachment 10A, the EOP locker in the shift (stored in the EOP locker in the clerk's office) shift clerks office) 7 Door Stops and initials Attachment 1OA.

4 Keys, all #172 (PA 2235) in Note: It is critical that the I

Work Control Key Cabinet equipment is obtained before the performance of the following actions. However, the following actions can be completed in any order.

CUE: After the operator has obtained the equipment, inform the operator to return equipment to storage, and to assume that the Equipment Required has been obtained.

1. BYPASS HPCI and RCIC high *operator inserts one #172 (PA temperature isolation trips at 2235) key into switch B21 B-S6A the following (Key 172, and rotates to the BYPASS PA2235, for all switches): position,

Switch 821 B-S6A CUE: The switch you have indicated is in the stated position.

  • HPCI panel 1O-C-641, *operator inserts one #172 (PA Switch 821 B-S6C 2235) key into switch B21 B-S6C and rotates to the BYPASS position, and initials Attachment 1OA.

CUE: The switch you have indicated is in the stated position.

Page 3of11

JPM NUMBER: ~~~~~~~~~-

PN005 NAME: ~~~~~~~~~~~~~~~~-

REV NUMBER: 00 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

  • RCIC panel 1O-C-621, *operator inserts one #172 (PA Switch 821 B-S5B 2235) key into switch B21 B-S5B and rotates to the BYPASS position, and initials Attachment 1OA.

CUE: The switch you have indicated is in the stated position.

  • RCIC panel 1O-C-640, *operator inserts one #172 (PA Switch 821 B-S5D 2235) key into switch B21 B-S5D and rotates to the BYPASS position, and initials Attachment 1OA.

CUE: The switch you have indicated is in the stated position.

2. BLOCK OPEN the following doors in the Lower Relay Room. ' *operator opens and blocks 5335A,5302A,5302C,5316B, open door 5335A using a Door 5318C Stop, Note: The doors may be blocked open in any order.

CUE: The door you have id.entified is blocked open.

  • operator opens and blocks open door 5302A using a Door Stop, CUE: The door you have identified is blocked open.
  • operator opens and blocks open door 5302C using a Door Stop, CUE: The door you have identified is blocked open.
  • operator opens and blocks open door 5316B using a Door Stop, CUE: The door you have identified is blocked open.

Page 4of11

JPM NUMBER: PN005 NAME: ~~~~~~~~~~~~~~~~-

REV NUMBER: 00 DATE:

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

  • operator opens and blocks open door 5318C using a Door Stop, and initials Attachment 1OA.

CUE: The door you have identified is blocked open.

3. OPEN the circuit breakers in Operator reads and initials Step the following tables to shed when complete.

non-essential loads.

Note: All of the following actions are located in 54' CONTROL DIESEL, RM 5102A.

I LOCATION PANEL#

54* *operator locates 1BJ483, CONTROL 1BJ483 DIESEL and simulates opening circuit RM 5102A breaker #6, CIRCUIT#6 and initials block.

FUSE PANEL 1YF406 I CUE: The breaker you have indicated is open.

CIRCUIT#10 *operator simulates opening ELECTRICAL PROTECTION circuit breaker #10, ASSEMBLY 1AN414 and initials block.

CUE: The breaker you have indicated is open.

CIRCUIT#22 *operator simulates opening FEEDWATER & RECIRC circuit breaker #22, INSTR. CAB. 10C612 and initials block.

CUE: The breaker you have indicated is open.

LOCATION PANEL#

54* *operator locates 1AJ483, CONTROL 1AJ483 DIESEL and simulates opening circuit RM 5102A breaker #7, CIRCUIT#? and initials block.

FUSE PANEL 1YF405 CUE: The breaker you have indicated is open.

Page 5of11

JPM NUMBER: ~~~~~~~~~-

PN005 REV NUMBER: 00

(*Critical Step) COMMENTS STEP SAT/

ELEMENT (#Sequential Step) (Required for NUMBER UNSAT STANDARD UNSAT)@

CIRCUIT#9 *operator simulates opening ELECTRICAL PROTECTION circuit breaker #9, ASSEMBLY 1AN413 and initials block.

CUE: The breaker you have indicated is open.

CIRCUIT#15 *operator simulates opening ROD POSITION INFO CAB circuit breaker #15, 10C615 and initials block.

CUE: The breaker you have indicated is open.

CIRCUIT#21 *operator simulates opening PROCESS INSTR. VERT. circuit breaker #21, BOARD 10C613 and initials block.

CUE: Th~{breaker you have indicated is open.

LOCATION PANEL#

54' *operator locates 1CJ483, CONTROL 1CJ483 DIESEL and simulates opening circuit RM 5102A breaker #6, CIRCUIT#6 ROD SEQUENCE CONTROL and initials block.

CAB 10C659 CUE: The. breaker you have indicated is open.

4. NOTIFY CONTROL ROOM Operator notifies the control room, THAT 30 MINUTE SBO and initials Step.

ACTIONS FOR ATTACHMENT 10A ARE COMPLETE and that you are continuing on with the remainder of the Attachment.

CUE: WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Task Standard: Operator performs the 30 MINUTE SBO Actions of HC.OP-AB.ZZ-0135 Attachment 1OA, Auxiliary Building Actions For SBO - Operator #1.

@Comments regarding any identified trainee failure to adhere to Operator Fundamentals of SER 3-05, Weaknesses in Operator Fundamentals, shall be noted in the comments. [IER L 1-11-3 Rec. 3b]

Page 6of11

SIMULATOR COPY _ _ OF _ _

EXAMINATION SCENARIO GUIDE SCENARIO TITLE: 2016 NRC EXAM SCENARI0-1 SCENARIO NUMBER: ESG-2016 NRC-1 EFFECTIVE DATE: Effective When Approved EXPECTED DURATION: 1 Hour REVISION NUMBER: 1 PROGRAM: 0 LICENSED OPERATOR REQUALIFICATION cg] INITIAL LICENSE OOTHER:

REVISION

SUMMARY

1. Minor editorial comments made from validation.

I. OBJECTIVE(S):

Enabling Objectives:

A. The crew must demonstrate the ability to operate effectively as a team while completing a series of CREW CRITICAL TASKS, which measure the crew's ability to safely operate the plant during normal, abnormal, and emergency plant conditions.

(Crew critical tasks within this examination scenario guide are identified with an"*".)

II. MAJOR EVENTS:

A. Remove EOG From Service

8. EOG Trip C. Raise Reactor power using Control Rods.

D. Stuck Control Rod E. Seismic Event (>OBE) I EHC Filter Clogging F. Safety Relief Valve Stuck Open G.ATWS H. SBLC Failure to Auto Start I SBLC Pump B Failure on Start I. RWCU Failure to Automatically Isolate J. Loss of EHC K. RHR Pump Trip Ill. SCENARIO

SUMMARY

The scenario begins with the plant at approximately 88% power; with power ascension in progress following maintenance on RFPT AP101, and an Emergency Diesel Generator test in progress. The EOG will trip during its removal from testing, making the EOG inoperable.

After Technical Specifications are addressed, the crew will continue with the power ascension. A stuck rod will require actions to raise drive pressure to move the rod. EHC Filter clogging will occur during a seismic event. Actions will be successful in preventing a loss of EHC pressure. A SRV will open requiring a Reactor Scram to comply with Technical Specifications. An ATWS occurs on the scram. The Standby Liquid Control System will fail to automatically initiate, and one pump will fail after the system is manually placed in service.

Reactor Water Cleanup System will need to be manually isolated following SLC initiation. A loss of EHC will remove the Main Turbine and Bypass Valves from the pressure control strategy. The first RHR pump to be placed in service will trip requiring another pump be placed in service for containment control.

ESG-2016 NRC-1 Page 2 of 28 Rev. 1

IV. INITIAL CONDITIONS:

I l.C.

lnftial I

- - - INITIALIZE the simulator to 100% power, MOL, T ACS on SACS A.

REDUCE Reactor Power to 88% with Recirculation Pumps, and inserting Groups 1OA and 1OB rods.

_ _ _ ENSURE Recirculation Pump A speed is NOT 68-71% AND Pump B speed is NOT 67-73%.

STABILIZE Xenon concentration.

- - - ENSURE SACS Pump BP210 is in service, AND SACS Pump DP210 is in standby.

ENSURE RACS Pumps Band Care in service.

_ _ _ ENSURE EHC Pump AP116 is in service.

- - - START AG400 and load IAW HC.OP-ST.KJ-0001to1000 kw and 50-200 KvAR.

PREP FOR TRAINING (i.e., RM-11 set points, procedures, bezel covers)

Initial I

_ _ _ INITIAL IO.ZZ-0006;for the power ascension.

- - - ENSURE REMA is provided to support power ascension. Withdrawing 1OA rods then TCF adjustment.

- - - MARKUP HC.OP-ST.KJ-0001to Step 5.4.13.D.

REVIEW the Scenario Reference section and CLEAN the balded EOPs, ABs and SOPs listed (at a

--- minimum). (80091396 0270)

- - - COMPLETE the Simulator Ready for Training/Examination Checklist.

ESG-2016 NRC-1 Page 3 of 28 Rev. 1

EVENT FILE:

Initial Event Event Code: ET_ARRAY(2) & ZL TUEHSB 4

Description:

ET-2 ACTIVE & EHC B STARTED Event Code: lcvposx(1) <= 700 5

Description:

Rod 18-03 Position Event Code: sl_pmbrn 6

Description:

SLC Pump B Running Event Code: rh_bkr(1) & !et_array(14) 13

Description:

RHR A Running First Event Code: rh_bkr(2) & !et_array(13) 14

Description:

RHR B Running First Event Code: ZLLCWHIT(123) & (A3015_V >=308) 15

Description:

Rod 30-39 Selected AND Drive Pressure >=308 psid Event Code: MONVAR(18) ~700 16

Description:

RPV Pressure ~_700 psig ESG-2016 NRC-1 Page 4 of 28 Rev. 1

MALFUNCTION SCHEDULE:

Initial @Time Event Action Description RWCU isolation valve F001 failure to None None Insert malfunction CU11A auto close RWCU isolation valve F004 failure to None None Insert malfunction CU11 B auto close SBLC pump A failure of auto start None None Insert malfunction SL04A signal SBLC pump B failure of auto start None None Insert malfunction SL04B signal None None Insert malfunction RP06 Half-core ATWS - left side None None Insert malfunction CD033039 Control Rod 30-39 stuck None None Insert malfunction PC07 A on event 2 Seismic Event I Insert malfunction TC16 to 30.00000 in 120 on None None EHC pump discharge filter plugging event2 ADS/Relief valve F013D (MS LINE D)

None None Insert malfunction AD02DO on event 3 I

sticks open Insert malfunction TC16 to 0 on event 4 delete None None EHC pump discharge filter plugging in 1 None None Insert malfunction RPO? after 2 on event 5 Half-core ATWS - right side None None Insert malfunction SL01 B after 5 on event 6 SBLC injection pump BP208 failure

.None None Insert malfunction TCO?A after 300 on event 6 EHC pump A trip None None Insert malfunction TCO?B after 300 on event 6 EHC pump B trip Insert malfunction TC01-10 after 420 on event None None All turbine bypass valves fail closed 6

Insert malfunction QQ20 to SHORT on event None None RHR pump AP202 Malfunctions 13 Insert malfunction QQ21 to SHORT on event None None RHR pump BP202 Malfunctions 14 Insert malfunction CD033039 on event 15 None None Control Rod 30-39 stuck delete in 1 Insert malfunction AD02DO on event 16 delete ADS/Relief valve F013D (MS LINE D)

None None in 1 sticks open None None Insert malfunction DG02A on event 17 Diesel generator A failure ESG-2016 NRC-1 Page 5 of 28 Rev. 1

REMOTE SCHEDULE:

Initial @Time Event Action Description Insert remote EP01 after 360 to BYPASS on EP01 EOP-301, bypass MSIV (-129")

None None events isolation interlock Insert remote EP02 after 480 to BYPASS on EP02 EOP-311, bypass PCIG (-129")

None None event 9 isolation interlock Insert remote EP38 after 180 to Emergency on EP38 EOP-319, Restoring Instrument None None event 10 Air in an Emergency Insert remote EP09 after 240 to REMOVED on EP09 EOP-320 (step 5.1.2), ARI valve None None event 11 fuses F6A/F5A Insert remote EP1 O after 240 to REMOVED on EP10 EOP-320 (step 5.1.4), ARI valve None None event 11 fuses F6B/F5B Insert remote EP11 after 360 to INSTALLED EP11 EOP-320 (step 5.2.2), RPS None None on event 11 division 1 jumper Insert remote EP12 after 360 to INSTALLED EP12 EOP-320 (step 5.2.4), RPS None None on event 11 division 2 jumper Insert remote EP13 after 360 to INSTALLED EP13 EOP-320 (step 5.2.3), RPS None None on event 11 division 3 jumper Insert remote EP14 after 360 to INSTALLED EP14 EOP-320 (step 5.2.5), RPS None None on event 11 division 4 jumper Insert remote EP35 after 180 to FAIL_CLOSE None None EP35 EOP-322 HV-F006 HPCI to CS on event 12 OVERRIDE SCHEDULE:

Initial @Time Event Action Description ESG-2016 NRC-1 Page 6 of 28 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity Comments

Response

  • CRS directs unloading and Removing AG400 From Service: securing 1AG400 in accordance with HG.OP-ST.KJ-0001.
  • PO unloads and secures 1AG400 IAW HC.OP-ST.KJ-0001:

=> Presses DIESEL ENG GOV DECR PB and lowers load to 50-200 kw

=> Presses TRIP for EOG AG400 40107 Gen Brkr.

=> Uses GEN VR RAISE OR LOWER PBs CYCLE Generator terminal voltage between 4056V and 4394V I (one complete cycle) then returns voltage to approximately 4160V.

=> Presses GEN VR MAN PB and ensures the MAN light is on.

=> Uses GEN VR RAISE OR LOWER PBs, CYCLE ,,

Generator terminal voltage between 4056V and 4394V (one complete cycle), then returns voltage to approximately 4160V.

=> Presses GEN VR AUTO PB and ensures the AUTO light is on.

ESG-2016 NRC-1 Page 7 of 28 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity Comments

Response

EOG Trip

  • Crew recognizes EOG problem by:

BEFORE the operator stops the => OHA E4-A3 DIESEL ENG EOG, or at the discretion of the PNL A/B/C/D C423 Lead Examiner, TRIGGER ET-17 => OHA E4-A2 DIESEL GEN PNL A/B/C/D C422 REPORT as ABEO that there is a => GRIDS 03776 DG A large oil leak from EOG A. REGULAR LOCKOUT RELAY Report as EO that the oil leak is

  • CRS declares EOG A Perform Surveillance stopped. Cleanup is in progress. inoperable and enters Tech Requirement 4.8.1.1.1.a Spec 3.8.1.1. within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

If notified as SM/Work Control state Restore the inoperable that ST.ZZ-0001 will be performed

  • diesel generator to by another operator. Continue with OPERABLE status power ascension. within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, OR Verify the Salem Unit 3 gas turbine generator (GTG) is available within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter*, and restore the inoperable diesel generator to OPERABLE status within 14 days.

Power Ascension:

  • CRS directs power ascension IAW 10-6.

As RE, PROVIDE the following

  • Emergency Load reductions will be performed using SPRG.

ESG-2016 NRC-1 Page 8 of 28 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity Comments

Response

=:. Presses the desired Control Rod Select PB

=:. Momentarily presses the WITHDRAW PB

=:. After the withdrawal cycle is completed, ENSURE that the rod position indicates that the rod is in the correct, even numbered position and initials REMA.

Rod 30-39 Stuck:

Rod 30-39 Stuck is pre-inserted.

CRS refers to TIS

  • CRS Implements AB.IC 0001 3.1.3.1 if rod is

=:. Condition F determined to be non-moveable.

  • RO performs actions of Condition F of AB.IC-0001:

=:. Verifies NO Rod Blocks are present.

=:. Attempts to operate the drive in both directions to determine the exact condition of the Control Rod.

=:. Vent Control Rod using Continuous Insert PB.

=:. Attempts to withdraw Control Rod using Withdraw PB (including Continuous Withdraw PB).

ESG-2016 NRC-1 Page 9 of 28 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity Comments

Response

. Simultaneously presses and holds both the Withdraw PB and the Continuous Withdraw PB.
. Momentarily presses and then releases the CONTINUOUS INSERT PB(this step may be repeated).
. Releases both the Withdraw PB and the Continuous Withdraw PB.
. Raises the drive water pressure in approximately I 50 psid increments, not to exceed 500 psid (to approximately 315 psig) by throttling closed HV-F003
. Attempts to notch in OR notch out the control rod at each new pressure increment.
  • RO determines that the control rod is freed and returns the drive water pressure to the normal operating range (260-270 psid on A3015).
  • RO ensures that rod 30-39 is at the desired position and initials REMA.

ESG-2016 NRC-1 Page 10 of 28 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity Comments

Response

Earthquake:

  • Crew recognizes Seismic After CRD is returned to normal Event by:

and at the discretion of the Lead ~ OHA C6-C4 "SEISMIC Examiner, MON PNL C673" GRIDS D3977 "SEISMIC

TROUBLE ALARM TRBL" Effect (if available} at medium volume for about 15 seconds ~ Response Spectrum OR Analyzer indications on ANNOUNCE "You feel motion 10C650C then it stops", AND TRIGGER ~ Loud rumbling noise ET-2 (if available)

  • Crew monitors critical parameters to determine if plant is stable. I

!E Crew calls National Earthquake

  • CRS implements Center, AB.MISC-0001:

THEN REPORT a seismic event of ~ Condition E 6.0 on Richter scale centered 12 ~ Condition F miles east of Wilmington, DE.

!E Crew calls Security,

  • RO/PO implements THEN REPORT the Security AR.ZZ-0011 Attachment C4.

system is intact.

!E dispatched to 1OC673,

  • Crew dispatches ABEO to THEN REPORT: 10C673.
  • The Event Indicator is WHITE
  • Crew recognizes a seismic
  • The tape machines have event >0.1 g has occurred advanced but are not running
  • The Amber Alarm light on the Seismic Switch Power Supply drawer is lit.

IF directed to reset 1OC673,

  • RO/PO directs ABEO to reset THEN DELETE Malfunction 1OC673 IAW SO.SG-0001.

PC07A.

  • RO/PO record Seismic Response Spectrum Analyzer lights on AR.ZZ-0011 Att.

C4-1.

ESG-2016 NRC-1 Page 11 of 28 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity Comments

Response

  • RO/PO reset Seismic Response Spectrum Analyzer IAW SO.SG-0001.

IF directed to investigate EOG

  • RO/PO investigates A EOG alarms, THEN REPORT alarms LO and HI Priority Alarms.

were Fuel Oil Day Tank Hi/Lo alarms.

EHC Filter Clogging:

  • Crew recognizes clogging of AP116 EHC pump discharge EHC Filter Clogging is automatically filter by:

inserted on ET-2. => OHA D3-F5 "TURB HYDR PUMP TROUBLE"

=> GRIDS 03627 "MAIN TURB EHC PUMP A FILTER DP" lnSight Item:

  • RO/PO responds to OHA IAW CRS may refer to

tupehchd HC.OP-AR.ZZ-0024.

  • EHC Pump Disch Pressure tup.ehc(1-2)
  • EHC Pump Filter D/P tupehcdp(1-2)

IF dispatched to the EHC pump, THEN REPORT AP116 discharge

  • RO/PO directs EO to the EHC skid to investigate the problem filter dp is very high.
  • RO/PO presses HYDR FLUID PUMP B MAN Pb.

ENSURE ET-4 actuates when BP116 is started.

  • RO/PO presses BP116 START Pb and ensures HDYR FLUID PUMP BLOW DISCH PRESS is OFF.

IF dispatched to swap EHC filters, THEN REPORT EHC Pump AP116

  • RO/PO directs EO to SWAP the AP116 HYDR FLUID filters have been swapped. PUMP in service Discharge Filter IAW HG.OP-SO.CH-0001 (Q).

ESG-2016 NRC-1 Page 12 of 28 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity Comments

Response

  • RO/PO presses HYDR FLUID PUMP A STOP Pb.
  • RO/PO presses HYDR FLUID PUMP A AUTO Pb.

Stuck Open SRV:

  • Crew recognizes SRV open by:

At the discretion of the Lead =:> OHA C1-A3 "ADS/SAFETY Examiner, TRIGGER ET-3 (PSV RELIEF VALVE NOT F013D Inadvertent Opening). CLOSED"

=:> Acoustic Monitor Indication on 10C650C

=:> Tailpipe temperature on TR-R614

=:> L:.owering MWe

=:> Steam Flow to Feed Flow mismatch

=:> RPV level swell lnSight Items:

  • PO cycles SRV control switch
  • PSV-F013D Position in attempt to close the SRV .

advpos(4)

  • F013D B Channel Switch ,,

zdads1(4)

  • F013D D Channel Switch zdads2(4)
  • CRS implements AB. RPV-0006.

Action taken to comply

  • CRS recognizes SRV will not with T/S 3.4.2.1.b.

close within two minutes, directs:

=:> Reducing recirc pumps to minimum speed

=:> Locking the Mode Switch in SHUTDOWN ESG-2016 NRC-1 Page 13 of 28 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity Comments

Response

  • RO performs the following:
. Reduces Recirc Pumps A

& B to minimum speed

. Locks the Mode Switch in SHUTDOWN
. Performs scram actions IAW AB.ZZ- 0001 Att. 1.

ATWS >4%:

  • Crew recognizes Scram Condition and Reactor Power The half core A TWS is already Above 4% EOP entry inserted on the right side of the condition:

core.  :::;. Rod FULL IN lights on Full Core Display Not lit as I expected

. APRM indications show higher than expected power levels
  • Crew recognizes RPV Level ,,

Below 12.5" EOP entry condition by:

. OHA C5-A4 "RPV WATER LEVEL LO"
. OHA A7-D5 "RPV LEVEL 3"
. Various water level indicators
. Initiating SLC
. Verifying RWCU Isolates Crew starts AP208 SLC ENTER Suppression
  • Pool temp when AP208 pump before Suppression Pool temperature reaches SLC pump is started:

110 degrees. Temp:

ESG-2016 NRC-1 Page 14 of 28 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity Comments

Response

RWCU Failure to Isolate:

  • RO/PO manually initiates SLC identifies that RWCU FAILS to RWCU failure is pre-inserted. isolate, isolates RWCU by closing HV-F001 and HV-F004, and notifies CRS of responses and actions taken.

Failure of SLC to Auto-Start/Trip

  • Crew recognizes trip of BP208 of SLC Pump: SLC pump by:

=> OHA C1-B1 "SLC The BP208 SLC pump will trip 5 PUMPNALVE O/PF"

=> OHA C1-F1 "SLC/RRCS seconds after starting.

INITIATION FAILURE"

=> CRIDS D3023 "SLC INJ I

PMP BP208 TROUBLE TRBL"

=> Flashing STOP light for BP208 IF dispatched to investigate trip of

  • Crew dispatches NEO and BP208, Maintenance to investigate trip THEN REPORT the motor is hot to of BP208 SLC pump.

the touch and the breaker will not reset. (52-222101)

=> Verifying Recirc runback to minimum

=> Tripping reactor recirc pumps

  • RO/PO:

=> Verifies Recirc runback to minimum

=> Trips reactor Recirc Pumps

  • RO/PO inhibits ADS IAW AB.ZZ-0001 Att. 13.

ESG-2016 NRC-1 Page 15 of 28 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity Comments

Response

CREW prevents an This Critical Task is not

  • applicable if RPV level uncontrolled depressurization during never reaches -129".

A TWS conditions by See justification for preventing ADS failure criteria.

ACTUATION.

REFER to the appropriate EOP and

  • CRS directs performance of The timing, order, and SUPPORT Crew requests for EOPs the following EOPs: priority of the EOP IAW with the following. Validated =;. EO.ZZ-0320 "Defeating performance may vary.

execution time delays are built-in: ARI and RPS Interlocks" EOP-301: ET-8 =;. EO.ZZ-0301 "Bypassing EOP-311: ET-9 MSIV Isolation Interlocks" EOP-319: ET-10 =;. EO.ZZ-0311 "Bypassing EOP-320: ET-11 Primary Containment EOP-322: ET-12 Instrument Gas Isolation 1 Interlocks" STRATEGIES FOR SUCESSFUL =;. EO.ZZ-0319 "Restoring TRANSIENT MITIGATION Instrument Air in an Promptly initiate actions IAW the 300 Emergency" series EOPs to shutdown the reactor.

Timely actions will reduce the potential

=;. EO.ZZ-0322 "Core Spray continued challenges to containment. In Injection Valve Override" addition, once the post scram hard card actions have been completed and RPV ,,

level has stabilized in the required band, an NCO should be assigned the responsibility to insert control rods IAW the post ATWS CRD operation hard card and CRAM move sheets. When control room portions of EOP-320 have been completed and the NCO is ready to re-insert a manual scram, the NCO should perform a crew update and utilize the post scram hard card to implement the applicable post scram actions following the manual scram attempt.

  • CRS directs terminating and preventing injection to the RPV with the exception of:

=;. SLC

=;. CRD

=;. RCIC ESG-2016 NRC-1 Page 16 of 28 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity Comments

Response

  • RO/PO terminate and prevent injection IAW AB.ZZ-0001:

=> Attachment 16 (1 OC651)

=> Attachment 17 (1 OC650)

The first RHR pump to

  • CRS directs maintaining RPV be started will trip. Refer water level between -50" and -185". to RHR Pump Trip event description on page 19.
  • RO/PO control level as directed by CRS with:

=> Feedwater IAW AB.ZZ-0001 Att. 14

=> RCIC IAW AB.ZZ-0001 Att.

I 6

=> HPCI IAW EOP-322

  • Crew maintains or restores adequate core cooling by maintaining or restoring RPV level above-185" /AW EOP-101A without

,, Emergency Depressurizing.

  • CRS directs bypassing the RWM and commencing manual rod insertion.
  • RO/PO aligns CRD for ATWS operation IAW AB.ZZ-0001 Attachment 18.

ESG-2016 NRC-1 Page 17 of 28 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity Comments

Response

Total Loss of EHC:

  • RO/PO recognizes loss of both EHC Pumps and informs Ensure ET- is active following the CRS.

trip of SLC Pump 8. The bypass valves will fail shut about 2 minutes later.

  • RO/PO aligns CRD for A TWS operation IAW AB.ZZ-0001 Attachment 18.

==> OHA D3-D5 "EHC UNIT PANEL 1OC363"

==> DEHC Bypass Valve Positioning Error alarms

==> Reactor pressure rising above Pressure Setpoint STRATEGIES FOR SUCESSFUL TRANSIENT MITIGATION

  • CRS directs stabilizing When pressure control pressure below 1037 psig swaps to SRVs, Pressure Leg with: maintaining RPV water Direct initial pressure control as Stabilize level between -50" and

==> Main Stearn. Line Drains pressure 800 psig to 1000 psig. The lower limit of 800 psig will not complicate RPV ==> SRVs -129" will be very level maintenance and will prevent an ==> RPFT challenging due to unwanted cooldown. The upper limit of shrink and swell and 1000 psig is a round number below 1047 changing reactor psig.

pressure with the RFPTs in MAN.

  • RO/PO control pressure as directed by CRS with:

==> Main Steam Line Drains IAW AB.ZZ-0001 Att. 15

==> SRVs IAW AB.ZZ-0001 Att. 13

==> RFPTs ESG-2016 NRC-1 Page 18 of 28 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity Comments

Response

  • Crew recognizes Supp Pool Temp Above 95°F EOP entry condition by:
. OHA C8-F1 "SUPPR POOL TEMP HIGH"
. Flashing 95 degree status light on 1OC650C
. RM11 9AX833/834 alarm
. Various Suppression Pool temperature indicators Strategies For Successful Transient Mitigation

Torus Temperature Leg Start all available Torus cooling as soon as possible to remove heat from containment.

  • CRS directs placing RHR in I Suppression Pool Cooling.
  • RO/PO place RHR in Suppression Pool Cooling IAW AB.ZZ-0001 Att. 2 or 3.

TriQ of RHR PumQ:

  • RO/PO recognizes RHR Pump trip.

RHR Pump will trip after placing it in service, or it starting automatically.

  • CRS directs placing remaining A/B RHR pump in Suppression Pool Cooling.
  • RO/PO place remaining A/B RHR pump in Suppression Pool Cooling IAW AB.ZZ-0001 Att. 2 or 3.

ESG-2016 NRC-1 Page 19 of 28 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity Comments

Response

IF dispatched to investigate the trip

  • Crew dispatches operator and of the A/B RHR pump, Maintenance to the tripped THEN REPORT: RHR pump and breaker.
  • The breaker has target flags dropped on the 51A and 518 Time Overcurrent relays (401/402 bkr 06)
  • The pump motor is hot to the touch and bearing oil levels are normal
  • IF Suppression Pool temperature is >110 degrees, AND Reactor power is >4%,

AND SRVs are open or

cycling, THEN Crew terminates and prevents injection to the RPV with the exception of SLC, CRD, and RCIC, UNTIL Reactor power is <4%,

OR RPV level reaches -129",

OR SRVs remain closed.

  • : !E RPV level reaches -129",
  • THEN RO/PO terminate and prevents injection from Core Spray IAW AB.ZZ-0001 Attachment 16.

WHEN the Crew has reset RPS,

  • WHEN EOP-320 Section 5.1 THEN DELETE Malfunctions RP06 and 5.2 are complete, AND RP07 to allow full rod THEN the Crew implements insertion on the next scram. EOP-320 Section 5.3 and reset RPS.

At the Lead Examiners discretion,

  • WHEN OHA C5-B4 clears, MODIFY lnSight Item lclsdv to THEN the Crew initiates a accelerate draining of the SDV. manual scram IAW EOP-320 Section 5.3.

ESG-2016 NRC-1 Page 20 of 28 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity Comments

Response

  • Crew recognizes the reactor is shutdown by:
> SPDS ALL RODS IN I
> RWM Confirm Shutdown
> GRIDS Rod positions
  • CRS directs terminating SLC injection.
  • RO/PO terminates SLC injection.

Termination Reguirement:

the discretion of the Lead Examiner when:

  • RPV Level is being maintained above-185" AND
  • All rods are fully inserted ESG-2016 NRC-1 Page 21 of 28 Rev. 1

SIMULATOR COPY - - OF - -

EXAMINATION SCENARIO GUIDE SCENARIO TITLE: 2016 NRC EXAM SCENARIO SCENARIO NUMBER: ESG-2016NRC-2 EFFECTIVE DATE: Effective When Approved EXPECTED DURATION: 60 Minutes REVISION NUMBER: 0 PROGRAM: 0 LICENSED OPERATOR REQUALIFICATION

~ INITIAL LICENSE OOTHER:

REVISION

SUMMARY

  • Incorporated minor Editorial comments from validation.

I. OBJECTIVE($):

Enabling Objectives:

A. The crew must demonstrate the ability to operate effectively as a team while completing a series of CREW CRITICAL TASKS, which measure the crew's ability to safely operate the plant during normal, abnormal, and emergency plant conditions.

(Crew critical tasks within this examination scenario guide are identified with an"*".)

II. MAJOR EVENTS:

A. Place Remaining Circulating Water Pumps In-Service B. Raise Power with Control Rods C. Flow Unit Failure D. LossofBD481120VAC 1E Inverter E. Steam Leak in the Steam Tunnel-Scram-MSIV Isolation Failure F. LOCA G. Suppression Pool Leak II. SCENARIO

SUMMARY

A Reactor startup is in progress following a forced outage. Nitrogen Makeup to the Drywell is:*

in progress following lnerting the Containment. The crew will place remaining Circulating Water Pumps in-service. Power will then be raised using Control Rods. During rod movement a Recirculation Flow Unit will fail initiating a % Scram and Rod Block. The crew will take action to bypass the failed Flow Unit and reset RPS in order to continue with the startup. A loss of a Class 1E 120VAC Inverter will cause a trip of the running Fuel Pool Cooling System (FPCS) pump and cause a loss of Reactor Building Ventilation. The crew will restore FPCS flow and cooling, and put FRVS in service. A steam leak develops in the Steam Tunnel that requires a scram and closure of the Main Steam Isolation Valves (MS IVs). Manual action will..

be required to ensure isolation of the Main Steam Lines. A small break LOCA will develop during pressure control operations which will raise Drywell Pressure to above the High-High Pressure setpoint. A break develops on the suction line to RHR Pump D when the pump starts. The crew will be required to isolate the leak to maintain Suppression Pool level without Emergency Depressurizing the Reactor.

ESG-2016NRC-2 Page 2 of 21 Rev. 1

V. INITIAL CONDITIONS:

l.C.

Initial

- - - INITIALIZE to IC at approximately 9% power with Reactor Startup in progress.

INSERT Control Rods (Reverse Pull) to stabilize power at approximately 5%.

- - - DE-INERT Containment.

- - - ENSURE HC.OP-IO.ZZ-0003 complete through Step 5.3.38, and 5.3.39A, B, and G.

ENSURE Containment is inerted, and Drywell makeup is in progress.

ENSURE TAGS is supplied by SACS A.

- - - ENSURE HV-2173, CLG TWR BYPASS VALVE is CLOSED.

- - - ENSURE sufficient Condensate Demineralizers are in service/standby to support startup PREP FOR TRAINING (i.e., RM-11 set points, procedures, bezel covers)

Initial I

- - - MARKUP HC.OP-IO.ZZ-0003;through Step 5.3.38, and 5.3.39A and G; N/A E and F.

MARKUP HC.OP-SO.DA-0001 through Step 5.1.31.

- - - MARKUP HC.OP-SO.AC-0001 through Step 5.2.7.R.5.

MARKUP HC.OP-SO.CG-0001 through Step 5.9.3 [5.9.2 is N/A]; and Att 3 to 1.4.D for

--- degraded vacuum.

- - - MARKUP HC.OP-SO.GS-0001 through Step 5.2.10.

MARKUP Rod Pull List to Step 359, Rod 42-43@ 06.

ENSURE REMA available for Startup At a minimum review the Scenario Reference section and CLEAN the balded EOPs, ABs and SOPs listed. (80091396 0270)

- - - COMPLETE "Simulator Ready-for-Training/Examination Checklist".

EVENT FILE:

Initial Event Event Code: rh_bkr(4) 6

Description:

RHR Pump D Start Event Code: rhv004(4) <= 0 7

Description:

HV-F004D Closed ESG-2016NRC-2 Page 3 of 21 Rev. 1

MALFUNCTION SCHEDULE:

Initial @Time Event Action Description None None Insert malfunction NM12D to 0 on event 1 Flow summer K607D failure Loss of 120 VAC class 1 E inst bus None None Insert malfunction ED09B1 on event 2 1BD481 Insert malfunction MS04B to 80.00000 in None None Steam line B leak in tunnel 180 on event 3 None None Insert malfunction MS19B MSIV F022B fail to auto isolation None None Insert malfunction MS20B MSIV F028B fail to auto isolation Insert malfunction RR31A1 to 40.00000 in Recirc loop A small break [V] (10%-60 None None 300 on event 4 gpm, 100%-600 gpm)

Insert malfunction RH07D after 5 on event None None RHR Leak via Pump Suction, Loop D 6

Insert malfunction PC06 to 2.00000 on None None Suppression pool break event 6 Insert malfunction PC06 to 0 on event 7 None None Suppression pool break delete in 1 None None Insert malfunction HP06E HPCI aux oil pump failure to auto start REMOTE SCHEDULE:

Initial <@Time Event Action Description None None Insert remote HV011 to STOP on event 3 HV011 Steam tunnel unit cooler AVH216 None None Insert remote HV006 to STOP on event 9 HV006 RBVS Supply fan C None None Insert remote HV005 to STOP on event 9 HV005 RBVS Supply fan B None None Insert remote HV004 to STOP on event 9 HV004 RBVS Supply fan A Insert remote HV003 after 5 to STOP on None None HV003 RBVS Exhaust fan C event 9 Insert remote HV002 after 6 to STOP on None None HV002 RBVS Exhaust fan B event 9

\

Insert remote HV001 after 7 to STOP on None None HV001 RBVS Exhaust fan A event9 ESG-2016NRC-2 Page 4 of 21 Rev. 1

OVERRIDE SCHEDULE:

Initial @Time Event Action Descriotion ESG-2016NRC-2 Page 5 of 21 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity Comments

Response

PLACE REMAINING CIRCULATING WATER PUMPS

  • CRS directs placing remaining Circulating Water Pumps in-IN-SERVICE service IAW HC.OP-SO.DA-0001.
  • PO places remaining Circulating Water Pumps in-service IAW HC.OP-SO.DA-0001:

INSERT Remote AN-06 to NORM

=> OBSERVE CIRCULATING WATER PUMP STR ENBL when necessary to acknowledge is illuminated local alarm on pump start.

=> PRESS Pump START push-button.

=> OBSERVE DISCH VAL VE OPEN/CLOSE MID I illuminates

=> PRESS Pump START push-button.

=> OBSERVE DISCH VALVE OPEN/CLOSE MID illuminates

=> PRESS DISCH VAL VE HV-2152A(B,C,D) OPEN FULL push-buttons to open fully each valve.

RAISE POWER WITH CONTROL RODS

  • CRS directs power ascension IAW 10-3 and REMA.

I ESG-2016NRC-2 Page 6 of 21 Rev.1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity Comments

Response

=> Presses the desired Control Rod Select PB

=> Momentarily presses the WITHDRAW PB

=> After the withdrawal cycle is completed, ENSURE that the rod position indicates that the rod is in the correct, even numbered position.

=> Initials Rod Pull Sheet Flow summer K607D failure:

  • Crew monitors Reactor power, After the Crew raises power, pressure, and level and OR, ensure plant conditions are at the discretion of the Lead stable.

Examiner, TRIGGER ET-1.

,,

  • Crew recognizes K607D failure Downscale by:

=> [C6-D1] "APRM/RBM FLOW REF OFF NORMAL".

=> Flow Units C & D "COMPAR" status lights.

=> CRIDS C049 "RECIRC FLOW COMPAR".

If panels are opened, state that indications on 1OC608 indicate

  • RO refers to HC.OP-AR.ZZ-0020, CRIDS C049:

K607D meter is downscale. => CHECK flow unit readings AND under the direction of Flow Unit D COM PARATOR and the SM/CRS BYPASS the Flow Unit C Comparator lights on unit having an off normal 1OC608 should be illuminated. reading.

ESG-2016NRC-2 Page 7 of 21 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity Comments

Response

  • Crew enters OP-AB.IC-0004

=> Condition F

=> Crew bypasses the affected Flow Unit.

=> Crew refers to DD.ZZ-0020 for a failed PPG Sensor.

=> Crew directs Reactor Engineering to evaluate the flow unit failure on the PPG.

NOTE: => Crew directs l&C to PLACE the MODE WHEN directed by the crew to Switch, on the D flow place the flow unit mode switch to u~it, to the the "unlabeled" position, THEN "UNLABELED" position MODIFY NM120 to 100%. between STANDBY and ZERO.

=> Crew verifies RPS Trip clear.

If panels are opened, state that indications on 1OC608 indicate

  • PO may check indications on 1OC608 and reports K607D is K607D is INOP. now BYPASSED.
  • Crew contacts Maintenance to troubleshoot K607D failure.
  • Crew contacts Operations Management.
  • CRS enters Tracking LCOs for Tech Spec 3.3.6 [since Mode 2], and may enter a Tracking LCO for 3.1.4.3 [since Mode 2].

ESG-2016NRC-2 Page 8 of 21 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity Comments

  • Response LOSS OF BD481120 VAC 1E INVERTER
  • Crew identifies the loss of BD481 by:

~ OHA D3-E3 120VAC UPS AFTER actions are completed for TROUBLE the stuck control rod, OR at the

~ GRIDS Page 167 discretion of the Lead Examiner, TRIGGER ET-2. ~ GRIDS D4971 in alarm

  • CRS enters AB.ZZ-0136 and Note: M/U to the drywell directs actions IAW will isolate on the AB.ZZ-0136:

inverter loss. RCIC is

~ Assess all plant systems inoperable due to no and enter appropriate power to the Flow Abnormal Procedures Controller.

~ Determine failed inverter

  • CRS implements AB.COOL- I 0004 for the loss of FPC Flow:

~ Condition I

  • PO restores Fuel Pool Cooling System flow IAW AB.COOL-0004 by restarting at least one Fuel Pool Cooling Pump as follows: ,,

~ Ensures Skimmer Surge Tank> 22".

~ Opens 1-EC-HV-4689A(B),

FILTER DEMIN BYPASS VALVE.

~ Closes 1-EC-HV-4689B(A),

FILTER DEMIN BYPASS VALVE.

~ Closes either 1-EC-HV-4676A OR 1-EC-HV-4676B, F/D INL ISLN.

~ Starts one Fuel Pool Cooling Pump A(B)P211.

  • CRS implements AB.COMP-0002 for the Inadvertent B Channel Isolation.:

~ Condition E ESG-2016NRC-2 Page 9 of 21 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity Comments

Response

  • PO ensures Isolations per Attachment 5 for B Channel.

=> KL-HV5126B

=> KL-HV5172B

  • Crew recognizes Loss of RBVS by:

=> RB D/P indication on 10C650E

=> SPDS RB PARAMETERS D/P indication.

=> OHA E1-F5 "COMPUTER PT IN ALARM"

=> GRIDS B7164 "REACTOR BLDG DIFF PRESS"

=> OHA E6-C5 "RBVS &

WING AREA HVAC PNL 10C382"

=> GRIDS D3960 "RBVS EXH RMT PNL C382 TRBL"

=> GRIDS D3961 "RBVS SUPPLY RMT PNL C382 TRBL"

  • CRS implements AB.CONT-003:

=> Condition A

=> Condition D

=> 3.6.5.1, IF unable to draw down the secondary containment to greater than or equal to 0.25" vac wg IF directed to secure RBVS,

  • RO/PO places FRVS in THEN TRIGGER ET-9. service IAW SO.GU-0001, or AB.ZZ-0001 Attachment 20.

ESG-2016NRC-2 Page 10 of 21 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity Comments

Response

If sent to investigate Inverter problem, report Blown Main Fuse

  • CRS recognize the following 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to reenergize Tech Specs actions apply for panel and restore indicated on the Inverter Section. the loss of BD481: inverter within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,

=> Distribution - Operating or Hot SD in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 3.8.3.1 action a AND d and Cold SD in following 24.

STEAM LEAK IN THE STEAM TUNNEL-SCRAM

  • Crew recognizes rising temperature in the Steam Tunnel by:

AFTER FPCCU System flow has

. been restored, OR at the

=> CRIDS A2541 "ST TUNNEL 10 VH216 INLET discretion of the Lead Examiner, AIR" TRIGGER ET-3.

=> OHA D3-A3 "MN STM/RWCU AREA LEAK TEMP HI"

=> CRI DS D5866 "RWCU/MAIN ST LEAK DETTMPCHW" IF dispatched to check the status of Steam Tunnel Unit Coolers,

THEN REPORT both Steam ..

Tunnel Unit Coolers are in service

=> Condition A (Do NOT actually place the coolers in service).

At the Lead Examiners discretion, RAISE Steam Tunnel

  • WHEN the Crew determines Steam Tunnel temperature temperature to 165 degrees in 2 cannot be maintained below degree increments using Insight 145 degrees THEN CRS Item mstunl. DIRECTS:

=> Lock the Mode Switch in Shutdown ESG-2016NRC-2 Page 11 of 21 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity Comments

Response

STRATEGIES FOR SUCESSFUL TRANSIENT MITIGATION

  • RO observes Recirc pump speeds at minimum and locks Reactor Scram Reports the Mode Switch in Following a Reactor scram, the SHUTDOWN and performs NCO should make an initial scram scram actions IAW AB.ZZ-report by announcing reactor 0001 Att. 1.

status IAW HC.OP-AB.ZZ-0001.

Crew personnel should hold all other non-essential communications until after the initial scram report is complete.

The Control Room Supervisor should silence alarms during the scram report and the SM/CRS is not required to make a statement directing the NCO to check the overhead alarms, since these actions are already expected immediately following the scram.

During the scram report, the NCO should report reactor level and pressure and their trends to the Control Room staff IAW HC.OPAB.ZZ-0001.

  • CRS implements AB-000 .
  • CRS may direct placing FRVS in service.

MSIV ISOLATION FAILURE

  • Crew recognizes isolation signal has been generated by:

MSIV isolation failure is pre-

~ OHAsC8-A14,NSSSS Crew may isolate the inserted.

MSIV LOGIC A(B,C,D) MSLs before isolation INITIATED signal is received.

~ OHA C8-C4, NSSSS ISLN SIG-STM TNL TEMP HI

  • RO recognizes all MSIVs are Immediate Operator NOT closed, closes at least Actions AB-CONT-one valve in the failed line, 0002.

and informs CRS.

ESG-2016NRC-2 Page 12 of 21 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event / Instructor Activity Comments

Response

LOCA

  • Crew recognizes LOCA condition:

AFTER the MSIVs have been closed, OR at the discretion of the

=> OHA C6 81 "OLD SYSTEM ALARM/TRBL" Lead Examiner, TRIGGER ET-4.

=> RM11 9AX314 OLD FLOOR ORN FLOW alarm

=> Rising Drywell Pressure

  • CRS implements AB.CONT-001:

=> Condition A

  • RO/PO ensures drywell cooling maximized.
  • Crew checks

=> Recirc pump seal parameters

=> SRV temperatures

  • Crew recognizes High Drywell Pressure EOP-101 and 102 entry condition:

=> OHA A 7-04 "DRYWELL PRESSURE HI/HI"

=> OHA C5-B5 "DRYWELL PRESSURE HI"

=> Various system initiations and isolations ESG-2016NRC-2 Page 13 of 21 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity Comments

Response

  • Crew recognizes High Drywell Temperature EOP-102 entry condition:

=> CRIDS 85070 SPDS DRYWELL AVG TEMP in alarm.

  • Crew recognizes LOCA Sequencer failure and starts/imitates various system initiations and isolations as necessary I

SUPPRESSION POOL LEAK

  • Crew recognizes lowering torus water level.

ENSURE ET-6 activates when RHR D pump starts.

  • Crew recognizes Supp Pool

,, Level Below 74.5 In EOP entry condition by:

=> OHA B1-C3 "SUPPRESSION POOL LEVEL HI/LO"

=> Various Suppression Pool level indicators

NOTE: Entry into EOP-103 may not be made until reports of high

water levels or Room Flood Alarm is received.

ESG-2016NRC-2 Page 14 of 21 Rev. 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Expected Plant/Student Event/ Instructor Activity Comments

Response

IF dispatched to 'D' RHR pump

  • Crew dispatches NEO and room, Maintenance to 'D' RHR pump THEN REPORT there is about room.

three inches of water on the floor.

Water is coming from a cracked weld on an elbow of the 'D' RHR pump suction line.

IF directed to place the DP202

  • RO/PO close 'D' RHR suction RHR pump breaker in PTL, valve.

THEN INSERT REMOTE ET109T TO TAGGED.

  • Crew isolates Suppression Pool leak and prevents a required Emergency Depressurization.

IF directed to implement

  • RO/PO coordinates EOP-315, implementation of EOP-315 THEN REPORT operators will be with NEO.

briefed and sent into the field.

Do NOT open makeup valves until after leak is isolated.

TERMINATION REQUIREMENT:

The scenario should be terminated at the discretion of the Lead Examiner when:

  • RPV Level and Pressure Control is established and
  • The RHR leak has been isolated.

ESG-2016NRC-2 Page 15 of 21 Rev. 1

COPY - - OF - -

SIMULATOR EXAMINATION SCENARIO GUIDE SCENARIO TITLE: PCIG Leak/Loss of 10A110/Loss of Feedwater/HPCI Trip/LOCA SCENARIO NUMBER: ESG-2016 NRC-3 EFFECTIVE DATE: Effective When Approved EXPECTED DURATION: 1.0 Hour REVISION NUMBER: 1 PROGRAM: x I LO. REQUAL X I INITIAL LICENSE

.____ __.I OTHER REVISION

SUMMARY

1. Incorporated Editorial comments from validation.

I. OBJECTIVE(S):

Enabling Objectives A. The crew must demonstrate the ability to operate effectively as a team while completing a series of CREW CRITICAL TASKS, which measure the crew's ability to safely operate the plant during normal, abnormal, and emergency plant conditions.

(Crew critical tasks within this examination scenario guide are identified with an "*.")

II. MAJOR EVENTS:

A. Recirculation Pump Runaway B. Primary Containment Instrument Gas Leak C. Loss of 10A110 D. Loss of Feedwater with Automatic Scram Failure E. Trip of HPCI F. LOCA G. Failure of 'A' Channel Core Spray and RHR Logics Ill. SCENARIO

SUMMARY

The scenario begins with the plant at 95% power with power ascension in progress. A Recirculation Pump runaway will occur during power ascension. The crew will need to lower power to less than the license maximum power level. After actions have been taken' for the power excursion a Primary Containment Instrument Gas Leak will develop and require the crew to isolate a portion of the PCIG System to stop the leak. After the leak has been isolated, the 1OA110 7 .2 KV bus is lost. The plant stabilizes in the OPRM Enable Region and power will rise to Region 1 due to the loss of Feedwater heating from the load reduction. The Crew must insert control rods to maintain the plant outside of Region 1. After exiting Region 1, 'C' PCP and all SCPs trip causing a complete loss of Feedwater. RPS fails to actuate on LVL 3 or the Mode Switch, and RPS or ARI must be manually initiated to shutdown the Reactor. Shortly after the reactor is scrammed, HPCI will trip due to a failed turbine exhaust pressure transmitter. A LOCA will occur which will be beyond the capacity of available high pressure injection. The 'A' Channels of Core Spray and RHR will fail to automatically initiate, but can be manually initiated.

The Crew must Emergency Depressurize and restore level with low pressure ECCS.

ESG-2016 NRC-3 Page 2 of 28 Rev.: 1

IV. INITIAL CONDITIONS:

l.C.

Initial INITIALIZE the simulator to 100% power, MOL, TACS on SACS Loop A ENSURE 'D' SACS pump is in service and 'B' SACS pump in STBY.

- - - LOWER power to 95% with Recirculation Pumps.

- - - EQUALIZE Xenon concentration.

- - - ENSURE CROSSFLOW is BLOCKED and NOT APPLIED.

- - - ENSURE associated Schedule file open and running.

- - - ENSURE associated Events file open.

PREP FOR TRAINING (i.e., RM11 set points, procedures, bezel covers)

I initial I Description ENSURE Data Collection is trending the following variables:

  • Instrument Air Header Pressure: iapiarca/iapiarcb or equivalent
  • W/R Reactor Water Level: rrln091a or equivalent
  • Fuel Zone Reactor Water Level: rrlfzcha or equivalent At a minimum review the Scenario Reference section and CLEAN the balded EOPs, ABs and

- - - SOPs listed. (80091396 0270)

- - - COMPLETE the Simulator Ready for Training/Examination Checklist.

ESG-2016 NRC-3 Page 3 of 28 Rev.: 1

EVENT FILE:

Initial ET#

Event code: crqnmi <= 10 3

Description:

Reactor Power <= 10%

Event code: hpnt >= 2500 & monvar{174) >= -50 4

Description:

HPCI running and RPV Water Level >= -50" Event code: zcrpsudn 7

Description:

Mode Switch in SHUTDOWN Event code: zcrpsudn 8

Description:

Mode Switch in SHUTDOWN Event code: crqnmi <= 7.0 10

Description:

Reactor Power <= 7%

Event code: crqnmi <= 7.0 11

Description:

Reactor Power <= 7%

Event code: rrprv <= 765 12

Description:

Reactor Pressure <750 psig Event code: ZDRRS621{5) & !et_array{14) 13

Description:

RR A raise pb first Event code: ZDRRS621{6) & !et_array{13) 14

Description:

RR B raise pb first ESG-2016 NRC-3 Page 4 of 28 Rev.: 1

MALFUNCTION SCHEDULE:

Initial @Time Event Action Description None None Insert malfunction AD01 Failure of ADS valves to open Insert malfunction PC03E from Drywell pressure transmitter N094E None None 0.40000 to 0.40000 failure Insert malfunction RR20E from None None ECCS level transmitter N091 E failure 30.00000 to 30.00000 RRCS Level Transmitter LT-N402E None None Insert malfunction RZ01 E to 31 Failure RRCS Level Transmitter LT-N402F None None Insert malfunction RZ01 F to 31 Failure Insert malfunction IA03 from 0.00000 None None Loss of drywell instrument gas to 25.00000 in 600 on event 1 None None Insert malfunction ED03 on event 2 Loss of 7.2 KV bus E 10A110 Insert malfunction QQ02 to SEIZE on None None Condensate pump BP102 trip event 3 Insert malfunction QQ03 to SEIZE on None None Condensate pump CP102 trip event 3 Insert malfunction FW04B after 3 on None None Secondary condensate pump BP137 trip event 3 Insert malfunction FW04C after 3 on

None None Secondary condensate pump CP137 trip event 3 None None Insert malfunction HP03 on event 4 HPCI turbine trip CRYWOLF ANN B1C4 HPCI TURBINE None None Insert malfunction AN-81 C4 on event 4 TROUBLE None None Insert malfunction CD08A on event 4 CRD suction filter AF201 clogging None None Insert malfunction CD08B on event 4 CRD suction filter BF201 clogging Insert malfunction RR31 A2 after 120 to Recirc loop A large break [V] (10%-6000 None None 5.00000 in 600 on event 4 gpm, 100%-60000 gpm)

Insert malfunction TC01-10 on event None None All turbine bypass valves fail closed 12 Insert malfunction RZ01 E to 31 on RRCS Level Transmitter LT-N402E None None event 10 delete in 1 Failure Insert malfunction RZ01 F to 31 on RRCS Level Transmitter LT-N402F None None event 11 delete in 1 Failure None 7 SET rp_k14b =0.0 Allows Mode Sw to trip 81 RPS None 8 SET rp_k14d =0.0 Allows Mode Sw to trip 82 RPS ESG-2016 NRC-3 Page 5 of 28 Rev.: 1

REMOTE SCHEDULE:

Initial @Time Event Action Description EP11 EOP-320 (step 5.2.2), RPS division None None Insert remote EP11 to INSTALLED 1 jumper EP13 EOP-320 (step 5.2.3), RPS division None None Insert remote EP13 to INSTALLED 3 jumper Insert remote CD04 to OPEN on event CD04 CRD suction filter isolation valve None None 5 V030 OVERRIDE SCHEDULE:

Initial @Time Event Action Description None None Insert override 3S22_D_DI to On RPS MODE SWITCH - RUN (DI)

None None Insert override 10S200_A_DI to Off HV-F021 B OPEN (DI)

Insert override 9DS41_A_LO to On on None None TRIP UNIT IN CAL OR GROSS FAIL (LO) event 4 Insert override 3A28_C_DI to On on None None SIC-R621 A RAISE-REC IRC PUMP A (DI) event 13 Insert override 3A46_C_DI to On on None None SIC-R621 B RAISE-REC IRC PUMP B (DI) event 14 ESG-2016 NRC-3 Page 6 of 28 Rev.: 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Response Comments Recirculation Pum~

  • Crew recognizes Reactor Runaway: Recirculation pump runaway by:

Ensure ET-13(14) (Stuck ==> OHA C1-A5 "COMPUTER RAISE push button) is POINT IN ALARM" triggered when RR Pump ==> Reaciorpower>100%

speed is increased. ==> CRIDS D2899(2900)

"RECIRC MG A(B) SPEED CONTROL SIG FAIL"

==> CRIDS D2930(1) "RECIRC MG A(B) DRIVE TUBE LOCK TRBL"

==> SIC-R621A(B) SPEED DEMND and SPEED Upscale

==> 1OC650C Recirc and Jet pump indications

  • RO performs the following:

Immediate Operator I

==> Presses SCOOP TUBE TRIP for 'A' Recirc Pump Action IAW

==> Reduces A(B) Recirc Pump AB.RPV-0001.

speed to reduce power to Note: RR lockup may pre-transient value occur before pressing SCOOP TUBE TRIP ob.

  • CRS implements AB.RPV-001:

==> Condition F Crew reduces power to ::; 3840 RECORD the time that

  • power was above 3840 MWt as indicated by the PPC 5 minute average following the MWt.

Recirc Pump runaway.

TIME:

SUPPORT requests for local control of Recirc MG Oil

  • Crew ensures Recirc MG Oil Temperatures are maintained in Temperatures. ADJUST the normal band.

REMOTES CW15 and CW16 as necessary.

  • Crew Monitors Offgas Pretreatment AND Main Steam Line Radiation Monitors for indications of Fuel Damage.

ESG-2016 NRC-3 Page 7 of 28 Rev.: 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student Response Comments IF called as RE to determine

  • Crew determines peak thermal maximum thermal power power during the transient.

reached, THEN REPORT APRM power peaked at 103.6%.

  • CRS recognize the following IF mismatch is Tech Specs/actions apply: observed, then must

~ 2.C(1) Maximum Power Level restore recirc loop flow

~ 3.4.1.3 Recirculation Loop mismatch within two Flow hours or declare the A(B) loop inoperable.

PCIG Leak:

  • Crew recognizes PCIG leak by: With no operator action, After the Crew has taken ~ GRIDS A3460 "PCIG PCIG receiver actions for the runaway RECEIVER AT201 PRESS" pressures will reach 50 Recirculation Pump, and at the lowering psig in about 10 discretion of the Lead ~ GRIDS A3461 "PCIG minutes.

Examiner, TRIGGER ET-1 ' RECEIVER BT201 PRESS" (PCIG Leak on Supply Line to lowering Torus). ~ OHA A 1-A3 "INST GAS RECEIVER A PRESSURE LO"

~ OHA A1-A4 "INST GAS RECEIVER B PRESSURE LO"

  • ~ GRIDS D4480 "INSTRUMENT GAS PNL AC213 ALARM"

~ GRIDS D4481 "PCIG RECEIVER AT201 PRESSURE"

~ GRIDS D4482 INSTRUMENT GAS PANEL BC213"

~ GRIDS D4483 "PCIG RECEIVER BT201 PRESSURE"

~ Both PCIG compressors running Insight Items:

  • CRS implements AB.COMP-002:
  • 'A' PCIG Receiver press ~ Condition A iapigrca
  • 'B' PCIG Receiver press iapigrcb ESG-2016 NRC-3 Page 8 of 28 Rev.: 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Response Comments

  • Crew announces lowering PCIG pressure on plant page.
  • RO/PO closes:

=> HV-5156A

=> HV-51568

  • Crew recognizes leak isolated by rising PCIG receiver pressures.

IF dispatched as Site

  • Crew dispatches Site Protection Protection to check 02 levels, to conduct 02 samples in THEN REPORT all samples Reactor Building.

are normal.

!E dispatched to look for PCIG

  • Crew dispatches RBEO and leak, Maintenance to investigate loss THEN REPORT no evidence of of PCIG.

leak in PCIG rooms. You will begin walking down the lines I isolated by the 5156A/B.

IF directed to reset local panel alarms, THEN TOGGLE Remote AN-01A and AN-018 to NORMAL. REPORT alarm was "Low Low Pressure".

Loss of 10A110 Bus:

  • Crew recognizes:

After the Crew takes actions for => Reactor power lowering the PCIG Leak, => Reactor level swell OR at the discretion of the Lead

Examiner, TRIGGER ET-2.
  • Crew monitors Reactor power, pressure, and level until plant conditions are stable.
  • PO ensures Feedwater restores and maintains RPV level between LVL 4 and LVL 7.

ESG-2016 NRC-3 Page 9 of 28 Rev.: 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student Response Comments

  • Crew recognizes trip of 'A' Recirc pump by:

=> OHA C1-D4 "REACTOR RECIRC A TROUBLE"

=> OHA B3-F2 CROSSFLOW ALARM/TRBL

=> 1OC651 C pump d/p and flow indications

=> Flashing Reactor Recirculation PUMP A MOTOR GENERATOR TRIP light

  • RO ensures at least one Reactor Recirc pump remains running.
  • Only if INST AIR HOR PRESS
  • Crew recognizes loss of 10K107 reaches the LO Pressure by:

alarm. ' => OHA A2-B2 "COMPRESSED AIR PANEL OOC188"

=> 10K107 CPRSR MOT OVLD/PWR FAIL light

=> *OHA A2-A1/A2 "INST AIR HEADER A/B PRESS LO"

=> *GRIDS 04601 "INSTR AIR SPL Y HOR A PRESS LO"

=> *GRIDS 04602 "INSTR AIR SPLY HOR B PRESS" LO

=> Lowering Service and Instrument Air pressures

  • PO places OOK107 in service Immediate Operator IAW AB.ZZ-0001 Attachment 7. Action IAW AB.COMP-0001.
  • CRS enters AB.COMP-0001 and May enter Condition A, verifies immediate operator but success path actions complete. remains starting of OOK107.
  • Crew recognizes trip of AP102 The trips of AP102 and PCP and AP137 SCP by: AP137 are silent and

=> OVLD/PWR FAIL lights may not be immediately

=> STOP lights lit recognized by the

=> Motor amps zero Crew.

ESG-2016 NRC-3 Page 10 of 28 Rev.: 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Response Comments

  • Crew validates automatic actions:

=> Feedwater PCP Speed Limiter on

=> Feedwater SCP Speed Limiter on

=> Recirc pump Intermediate Run back

  • Crew recognizes loss of AK111 The trip of AK111 is TB chiller by: silent and may not be

=> Solid OVLD/PWR FAIL lights immediately recognized

=> STOP lights lit by the Crew.

=> Motor amps zero

  • Crew recognizes loss of 1OA110 bus from:

=> OHA E3-E1 7.2 KV S.YS INCOMING BRKR MALF

=> OVLD/PWR FAIL lights on loads lost

=> Flashing TRIP light for infeed bkr52-11001

=> CRIDS D3677 "SWGR BUS A110 DIFF LOCKOUT"

=> CRIDS D3679 "SWGR BUS A110 UNDERVOLTAGE"

=> GRIDS D5447 "SWGR BUS A 110 OVERCURRENT LKOUT"

  • Crew announces loss of 1OA110 The order of the AOP on the plant page. implementation may vary.
  • Crew recognizes entry into the OPRM Enable Region by:

=> OHA C3-F1 "OPRM TRIP ENABLED"

=> GRIDS D5941-5948 "OPRM TRIP ENABLED" ESG-2016 NRC-3 Page 11 of 28 Rev.: 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity IExpected Plant/Student Response Comments IF directed to monitor/control

  • CRS implements AB.RPV-0003: Rx Power ::::::56%

recirc MG oil temps, ~ Condition B Core Flow ::::::43 Mlbm/hr THEN INSERT CW15 and ~ Condition A on recorder CW16 and MONITOR: Core Flow ::::::44 Mlbm/hr

  • rrtoila(1) for 'A' MG by adding JP loop flows
  • rrtoila(2) for 'B' MG The pace of the scenario will not allow the Crew to fully address single loop requirements.

lE the Crew manually scrams,

  • IF in Region 1 of the Pwr/Flow THEN the Loss of Feedwater map, and LOCA will be automatically THEN RO inserts rods IAW ESG inserted. guidance as necessary to exit Region 1.
  • RO/PO close HV-F031A Recirc pump discharge valve for 5 minutes, then re-open.
  • RO/PO implements DL.ZZ-0026 Att. 3v.
  • CRS implements AB.RPV-0001:

~ Condition B

  • CRS implements AB.RPV-0004: May not enter if RPV

~ Condition D level alarms not

~ Condition G reached.

  • PO closes HV-1680A PCP discharge valve.
  • PO closes HV-1651A SCP discharge valve.
  • CRS references AB.CONT-0001: Due to pace of scenario

~ Condition A and relatively small

~ Condition E effect of AK 111 loss on drywell pressure, may NOT enter at this time.

ESG-2016 NRC-3 Page 12 of 28 Rev.: 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity IExpected Plant/Student Response Comments WHEN dispatched,

  • Crew dispatches TBEO and THEN REPORT the 10A110 Maintenance to investigate loss Bus Differential Overcurrent of 10A110 bus.

Relays are tripped. There is no visible indication of damage to the bus.

  • CRS recognize the following actions apply:

=> Recirculation Loops 3.4.1 .1 action a 4.4.1.1.1

=> Reactor Coolant System Specific Activity TIS Table 4.4.5-1 Item 4(b)

=> ODCM Table 4.11.2.1.2-1 Items (c) & (f)

  • CRS notifies Shift Rad Pro and Shift Chem Tech to take samples IAW:

=> TIS Table 4.4.5-1 Item 4(b)

=> ODCM Table 4.11.2.1.2-1 Items (c) & (f)

  • CRS implements IO.ZZ-0006 .

IF asked as RE,

  • Crew contacts RE for guidance .

THEN REPORT that inserting the first 12 steps of the CRAM rods can be used to achieve an 80% rod line.

ACKNOWLEDGE any direction to evaluate single loop operation IAW SE-PR.ZZ-0003.

ESG-2016 NRC-3 Page 13 of 28 Rev.: 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Response Comments

  • Crew contacts ESOC and Trading Floor, gives estimate of MWe output limitations and duration of limitation.

Loss of Feedwater I ATWS:

  • Crew recognizes loss of 20 minutes after the Loss of Feedwater by:

10A110 bus, => OHA A6-F2 "CONDENSATE I

OR TRAIN B TROUBLE at the discretion of the Lead => OHA A6-F3 "CONDENSATE Examiner, TRAIN C TROUBLE TRIGGER ET-3. => OHA B3-E1 "RFP TURBINE TRIP"

=> Flashing SCP TRIP lights

=> RFPT Governor Valve I

Positions

=> Feed flow indications

=> Lowering RPV level

  • RO locks the Mode Switch in SHUTDOWN when RPV level drops to 15" IAW AB.RPV-0004 Retainment Override.

(May scram earlier if the loss of RFPT's is recognized.}

  • Crew recognizes Scram Condition and Reactor Power Above 4% EOP entry condition.

ESG-2016 NRC-3 Page 14 of 28 Rev.: 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student Response Comments STRATEGIES FOR SUCESSFUL TRANSIENT MITIGATION

  • RO performs scram actions IAW The Mode Switch will AB .ZZ-0001 Att. 1. not actuate A1/A2 RPS, Reactor Scram Reports but the Arm & Depress Following a Reactor scram, the NCO should make an initial scram Pushbuttons will.

report by announcing reactor ARI will not status IAW HC.OP-AB.ZZ-0001. automatically initiate, Crew personnel should hold all but can be manually other non-essential initiated.

communications until after the initial scram report is complete.

The Control Room Supervisor should silence alarms during the scram report and the SM/CRS is not required to make a statement directing the NCO to check the overhead alarms, since these actions are already expected immediately following the scram.

During the scram report, the NCO '

should report reactor level and pressure and their trends to the Control Room staff IAW HC.OPAB.ZZ-0001.

Before Reactor Water Level RECORD the RPV level

  • at which RPS or ARI is reaches L VL 1, the Crew manually actuates RPS and/or actuated.

,, ARI to shutdown the reactor. RPV Level:

  • Crew recognizes RPV LVL 3 RPS A1/A2 will not EOP entry condition: actuate on ANY

=:> OHA C5-A4 "RPVWATER automatic scram LEVEL LO" signals.

=:> OHA A7-D5 "RPV LEVEL 3"

=:> Various water level indicators

  • AFTER the reactor is verified to be shutdown, THEN CRS exits EOP-101 A, implements EOP-101.

ESG-2016 NRC-3 Page 15 of 28 Rev.: 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Response I Comments I

STRATEGIES FOR SUCESSFUL TRANSIENT MITIGATION

  • Crew recognizes RPV LVL 2 by:

=> OHA A7-E5 "RPV LEVEL 2" EOP 101 RPV Control.

=> OHA C8-C3 "NSSSS ISLN Level Leg SIG - RPV LEVEL LO" Direct an initial band of +12.5" to +54" Rx level. This gives a manageable => OHA C1-D3 "REACTOR band with level control still in the RECIRC PUMPS TRIP" indicating range. If controlling => OHA E3-E3 "USS FEEDER Reactor Pressure with SRVs and the BRKRTRBL" MSIVs are closed, then the RPV level band assigned should be -30" to +30" to avoid high level trips of injection systems when the reactor is being depressurized and to maintain forced circulation in the RPV.

When maintaining RPV level is challenged by a lack of high pressure feed sources, and RPV level can not be maintained above -129", the crew should anticipate the actions that are necessary to implement EOP-202 and emergency depressurize the reactor prior to RPV level reaching -

185". Reducing reactor pressure under these conditions in anticipation of implementing EOP-202 is not permitted since RPV level would be further challenged without sufficient high pressure feed sources available to maintain level.

  • PO verifies HPCl/RCIC initiation . HPCI will NOT initiate until the reactor is scrammed.

LOCA with Tri12 of HPCI:

  • PO recognizes trip of HPCI by:

After HPCI recovers RPV water => OHA B1-A4 "HPCI TURBINE level to -50", ENSURE ET-4 TRIP" triggers to insert the LOCA with => OHA B1-B5 "HPCI OUT OF trip of HPCI, SERVICE" OR, => OHA B1-C4 "HPCI TURBINE at the discretion of the Lead TROUBLE" Examiner, => OHA B1-E5 "HPCI PUMP TRIGGER ET-4 manually. DISCHARGE FLOW LO"

=> HPCI Stop Valve & Control (The LOCA will start two minutes after HPCI trips) Valve failure to open

=> HPCI speed and flow indications

ESG-2016 NRC-3 Page 16 of 28 Rev.: 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event / Instructor Activity Expected Plant/Student Response Comments IF dispatched to investigate

  • Crew dispatches ABEO and HPCI trip units, Maintenance to investigate trip of THEN REPORT: HPCI.
  • E41-N656E Turb Exhaust Pressure is reading upscale with trip and gross fail lights lit.
  • E41-N656A Turb Exhaust Pressure is reading 0 IF dispatched to 'C' PCP,
  • Crew may dispatch TBEO and THEN REPORT the 51A and Maintenance to investigate trip of 51 C Time Overcurrent relays 'C' PCP.

are tripped on the breaker (52-10208) and the motor is hot to the touch.

IF dispatched to 'B/C' SCP's, THEN REPORT there are no apparent problems with the pumps or their breakers.

  • Crew recognizes LOCA condition:

=> OHA C6-B 1 "OLD SYSTEM ALARM/TRBL"

,, => RM11 9AX314 OLD FLOOR ORN FLOW alarm

=> RM 11 9AX317 /318/320 OLD CCM alarms

=> OHA D3-C3 "DRYWELL SUMP LEVEL HI/LO"

=> OHA A4-F5 "COMPUTER PT IN ALARM"

=> OHA A 7-E4 "DRYWELL PRESSURE HI/LO"

=> Rising Drywell Pressure on various indicators

  • CRS references AB.CONT-0006
  • CRS references AB.CONT-0001

=> Condition A

  • RO/PO ensures drywell cooling is maximized.

ESG-2016 NRC-3 Page 17 of 28 Rev.: 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE I Event / Instructor Activity IExpected Plant/Student Response Comments

  • Crew checks

=:> Recirc pump seal parameters

=:> SRV temperatures

  • Crew recognizes High Drywell Pressure EOP entry condition:

=:> OHA A7-D4 "DRYWELL PRESSURE HI/HI"

=:> OHA C5-B5 "DRYWELL PRESSURE HI"

=:> Various system initiations and isolations.

  • RO/PO verifies automatic actions.

I Failure of 'A' Channel

  • Crew recognizes failure of the A PCIS LOCA LVL 2 Initiations: Core Spray logics to initiate by: initiations WILL occur.

The failure of 'A' Core Spray =:> A INIT AND SEALED IN light and RHR logics to auto initiate extinguished is already inserted. =:> Pump STOPPED indication

=:> A channel breaker status on 1OC650E NON CLASS 1E LOAD ISLN CIRCUIT BREAKER STATUS AND CONTROL

=:> A EDGs not running

=:> Various valve failures to isolate

  • Crew recognizes failure of the 'A' RHR logic to initiate by:

=:> A INIT AND SEALED IN light extinguished

=:> Pump STOPPED indication

  • RO/PO manually initiates 'A' RHR logic.
  • RO/PO trips 'B' recirc pump if not already tripped by RPV Level 2.

ESG-2016 NRC-3 Page 18 of 28 Rev.: 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student Response Comments

  • CRS directs restoring PCIG to SRVs and Rx Bldg to Torus Vac Bkrs.
  • RO/PO restores PCIG to SRVs and Rx Bldg to Torus Vac Bkrs IAW AB.ZZ-0001 Att. 9.
  • !Ethe Crew attempts to reduce pressure with the bypass valves, THEN Crew recognizes the bypass valves fail shut at 750#

by:

=> OHA E1-F4 "COMPUTER PT RETURN TO NORMAL"

=> OHA D3-D5 "EHC UNIT PANEL 1OC363"

=> Bypass valve indication

=> BPV Positioning Error alarms '

IF directed to align for two CRD

  • CRS orders injection with two CRD pumps will trip on pump injection, CRD pumps. low suction pressure THEN PERFORM the due to suction filter following:
  • CRS orders injection with SLC clogging.

pumps.

REFER to SO.BF-0001 Sect 5.4.

  • WHEN RPV water level drops to -129",

TRIGGER ET-5 (Suction filter). THEN the Crew inhibits ADS.

SET Remote Function for Stby CRD pump discharge valve to 0% (CD01/CD02).

REPORT Stby CRD pump ready for start.

WHEN Stby CRD is running, THEN RAMP discharge valve to 100% open.

Due to suction filter clogging, the CRD pumps will trip before the remainder of the lineup can be completed.

ESG-2016 NRC-3 Page 19 of 28 Rev.: 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE Event/ Instructor Activity Expected Plant/Student Response Comments

  • WHEN the Crew determines RECORD compensated RPV water level cannot be RPV water level when maintained above -185", the Crew determines THEN the CRS implements EOP that Emergency 202. Depressurization is Crew determines that required.
  • Emergency Depressurization is required before LEVEL:

compensated RPV water level reaches -185"; AND subsequently restores and maintains RPV water level to above -161 ".

STRATEGIES FOR SUCESSFUL TRANSIENT MITIGATION

  • WHEN directed, THEN RO/PO open five ADS Emergency Depressurization SRVs IAW AB.ZZ-0001 Att. 13.

Level Response And Control I

The Control Room Supervisor should ensure that all ECCS is lined up for injection as required prior to initiating an emergency depressurization. Only ECCS required to support RPV reflood needs to be lined up for injection.

~: .Att. 4 for RHR manually initiated,

~ Att. 5 for Core Spray THEN the 'A' Core Spray loop will need to be manually aligned for injection during the blowdown.

ESG-2016 NRC-3 Page 20 of 28 Rev.: 1

V. SCENARIO GUIDE SEQUENCE AND EXPECTED RESPONSE I Event / Instructor Activity J Expected Plant/Student Response Comments STRATEGIES FOR SUCESSFUL TRANSIENT MITIGATION

  • AFTER adequate core cooling is restored, Emergency Depressurization THEN CRS directs placing RHR Level Response And Control For non-ATWS emergency in Suppression Pool Cooling and depressurizations, the Control Room Spray.

Supervisor should establish and maintain an RPV level band between

-38" to +54" on Wide Range indication. This transient level band will prevent adverse hydraulic effects caused by high outside shroud reactor level while maintaining adequate core submergence based on Fuel Zone indication. Following the emergency depressurization, level will be restored and maintained to the preferred EOP reactor level band by using a suggested Wide Range compensated level band of

+12.5" to +54" if possible using I Condensate and Startup Level Control or the Control Room Supervisor can maintain an RPV level band of -38" to +54" if still batch feeding with low pressure ECCS to maintain RPV level.

  • RO/PO place RHR in Suppression Pool Cooling and Spray as directed by CRS IAW AB.ZZ-0001 Attachment 3.
  • AFTER adequate core cooling is restored, THEN CRS directs placing one loop of RHR in Drywell Spray.

Termination Reguirement:

  • RO/PO place RHR in Drywell The HV-F021 B will The scenario may be Spray as directed by CRS IAW NOT open.

terminated at the discretion of AB.ZZ-0001 Attachment 2. The 'A' RHR pump the Lead Examiner when the CANNOT be placed in RPV has been depressurized drywell spray UNLESS and level is being maintained the 'A' RHR logic has above -129". been manually initiated.

ESG-2016 NRC-3 Page 21 of 28 Rev.: 1