(9 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML17082A002 | | | number = ML17082A002 |
| | issue date = 03/22/2017 | | | issue date = 03/22/2017 |
| | title = 2017/03/22 NRR E-mail Capture - Fort Calhoun Station - Final Nsir/Dpr RAI Regarding Proposed Emergency Planning Exemption (CAC No. MF9067) | | | title = NRR E-mail Capture - Fort Calhoun Station - Final Nsir/Dpr RAI Regarding Proposed Emergency Planning Exemption |
| | author name = Kim J | | | author name = Kim J |
| | author affiliation = NRC/NRR/DORL/LPLIV | | | author affiliation = NRC/NRR/DORL/LPLIV |
| | addressee name = Matzke E P | | | addressee name = Matzke E |
| | addressee affiliation = Omaha Public Power District | | | addressee affiliation = Omaha Public Power District |
| | docket = 05000285 | | | docket = 05000285 |
Line 13: |
Line 13: |
| | document type = E-Mail, Request for Additional Information (RAI) | | | document type = E-Mail, Request for Additional Information (RAI) |
| | page count = 4 | | | page count = 4 |
| | | project = CAC:MF9067 |
| | | stage = RAI |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Kim, JamesSent:Wednesday, March 22, 2017 1:30 PMTo:MATZKE, ERICK PCc:BLOME, BRADLEY H; CAMERON, COREY A | | {{#Wiki_filter:NRR-PMDAPEm Resource From: Kim, James Sent: Wednesday, March 22, 2017 1:30 PM To: MATZKE, ERICK P Cc: BLOME, BRADLEY H; CAMERON, COREY A |
|
| |
|
| ==Subject:== | | ==Subject:== |
| FORT CALHOUN STATION - FINAL NSIR/DPR RAI Regarding Proposed Emergency Planning Exemption (CAC NO. MF9067)Final Request for Additional Information On March 16, 2017, the U.S. Nuclear Regulatory Commission (NRC) staff sent Fort Calhoun Station (FCS) the draft Request for Additional Information (RAI). This RAI relates to exemptions from portions of Part 50 of Title 10 of the Code of Federal Regulations (10 CFR Part 50) for the FCS Radiological Emergency Response Plan.On March 22, 2017, a teleconference between FCS and NRC staff was held to discuss the information requested by the NRC staff was understood and any additional clarifications on the RAI were required. Based on the teleconference, FCS determined that the information requested by the NRC staff was clearly understood and any other additional clarifications on the RAI was not necessary. FCS agreed to provide a response to this final RAI shown below within 30 days from the date of this correspondence. The NRC staff also informed the licensee that a publicly available version of this final RAI would be placed in the NRC's Agencywide Documents Access and Management System. REQUEST FOR ADDITIONAL INFORMATION EXEMPTION FROM THE REQUIREMENTS OF 10 CFR 50.47 AND APPENDIX E OMAHA PUBLIC POWER DISTRICT FORT CALHOUN STATION DOCKET NO. 50-285 By letter dated June 24, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16176A213), supplemented by letter dated August 25, 2016 (Accession No. ML16242A127), OPPD submitted certification to the U.S. Nuclear Regulatory Commission (NRC) indicating its intention to permanently cease power operations at the FCS facility on October 24, 2016, pursuant to10 CFR 50.82(a)(1)(i). By letter dated November 13, 2016 (Accession No. ML16319A254), OPPD submitted a certification to the NRC of the removal of fuel from the reactor vessel, pursuant to 10 CFR 50.82(a)(1)(ii). Upon docketing of the certifications, the 10 CFR Part 50 license for FCS no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel, as specified in 10 CFR 50.82(a)(2). By letter dated December 16, 2016 (Agency-wide Documents Access and Management System (ADAMS) Accession No. ML16356A578), as supplemented by letter dated February 10, 2017 (ADAMS Accession No. ML17041A443), Omaha Public Power District (OPPD) requested exemptions from portions of Part 50 of Title 10 of the Code of Federal Regulations (10 CFR Part 50) for the Fort Calhoun Station (FCS) Radiological Emergency Response Plan. Specifically, OPPD requested exemption from certain Emergency Plan Requirements contained in 10 CFR 50.47(b), 10 CFR 50.47(c)(2), and Section IV to Appendix E of 10 CFR Part 50. The requested exemptions would allow OPPD to modify the FCS emergency plan commensurate with the reduced likelihood of significant radiological events presented by the permanently defueled condition of the reactor and low decay heat rate of the stored fuel. | | FORT CALHOUN STATION - FINAL NSIR/DPR RAI Regarding Proposed Emergency Planning Exemption (CAC NO. MF9067) |
| 2In reviewing the request for exemption, the NRC staff used the guidance from recent emergency preparedness (EP)-related decommissioning exemption reviews provided in Interim Staff Guidance (ISG) document - NSIR/DPR-ISG-02, "Emergency Planning Exemption Requests For Decommissioning Nuclear Power Plants" (ADAMS Accession No. ML14106A057). The staff also informed its review with guidance and regulations applicable to an Independent Spent Fuel Storage Installation (ISFSI). Based on the NRC staff's initial review of OPPD's EP exemption request, the following requests for additional information (RAIs) are required to facilitate completion of the staff's technical review: RAI-NSIR/DPR-001 In Table 1, "Exemptions Requested from 10 CFR 50.47(b) and 50.47(c)(2)", Item 18 (page 12), to Attachment 1 of the December 16, 2016 letter, OPPD provides the basis for the exemption to 10 CFR 50.47(c)(2), which references the U.S. Environmental Protection Agency (EPA) document, entitled "Protective Action Guides and Planning Guidance for Radiological Incidents, Draft for Interim Use and Public Comment," dated March 2013. It provides a quote from the referenced document that "EPZs are not necessary at those facilities where it is not possible for PAGs to be exceeded off-site." Since OPPD's December 16, 2016 letter, EPA issued a revision to the PAG Manual: "Protective Action Guides and Planning Guidance for Radiological Incidents, EPA-400/R-17/001," dated January 2017 (ADAMS Accession No. ML17044A073), which no longer includes the quote cited.
| | Final Request for Additional Information On March 16, 2017, the U.S. Nuclear Regulatory Commission (NRC) staff sent Fort Calhoun Station (FCS) the draft Request for Additional Information (RAI). This RAI relates to exemptions from portions of Part 50 of Title 10 of the Code of Federal Regulations (10 CFR Part 50) for the FCS Radiological Emergency Response Plan. |
| Please update the basis for the exemption in Table 1 to Attachment 1 accordingly, to reflect current Federal guidance provided in EPA-400/R-17/001.
| | On March 22, 2017, a teleconference between FCS and NRC staff was held to discuss the information requested by the NRC staff was understood and any additional clarifications on the RAI were required. Based on the teleconference, FCS determined that the information requested by the NRC staff was clearly understood and any other additional clarifications on the RAI was not necessary. FCS agreed to provide a response to this final RAI shown below within 30 days from the date of this correspondence. The NRC staff also informed the licensee that a publicly available version of this final RAI would be placed in the NRCs Agencywide Documents Access and Management System. |
| | REQUEST FOR ADDITIONAL INFORMATION EXEMPTION FROM THE REQUIREMENTS OF 10 CFR 50.47 AND APPENDIX E OMAHA PUBLIC POWER DISTRICT FORT CALHOUN STATION DOCKET NO. 50-285 By letter dated June 24, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16176A213), supplemented by letter dated August 25, 2016 (Accession No. ML16242A127), OPPD submitted certification to the U.S. Nuclear Regulatory Commission (NRC) indicating its intention to permanently cease power operations at the FCS facility on October 24, 2016, pursuant to10 CFR 50.82(a)(1)(i). By letter dated November 13, 2016 (Accession No. ML16319A254), OPPD submitted a certification to the NRC of the removal of fuel from the reactor vessel, pursuant to 10 CFR 50.82(a)(1)(ii). Upon docketing of the certifications, the 10 CFR Part 50 license for FCS no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel, as specified in 10 CFR 50.82(a)(2). |
| | By letter dated December 16, 2016 (Agency-wide Documents Access and Management System (ADAMS) |
| | Accession No. ML16356A578), as supplemented by letter dated February 10, 2017 (ADAMS Accession No. ML17041A443), Omaha Public Power District (OPPD) requested exemptions from portions of Part 50 of Title 10 of the Code of Federal Regulations (10 CFR Part 50) for the Fort Calhoun Station (FCS) Radiological Emergency Response Plan. Specifically, OPPD requested exemption from certain Emergency Plan Requirements contained in 10 CFR 50.47(b), 10 CFR 50.47(c)(2), and Section IV to Appendix E of 10 CFR Part 50. The requested exemptions would allow OPPD to modify the FCS emergency plan commensurate with the reduced likelihood of significant radiological events presented by the permanently defueled condition of the reactor and low decay heat rate of the stored fuel. |
| | 1 |
|
| |
|
| RAI-NSIR/DPR-002 Section IV.B.1 of Appendix E to 10 CFR Part 50 states, in part that "emergency action levels shall be reviewed with the State and local government authorities on an annual basis." OPPD proposes in Table 2, "Exemptions Requested from 10 CFR 50, Appendix E", Item 37 (page 21), to Attachment 1 of the December 16, 2016 letter, to "continue to review EALs with the State of Nebraska and Washington County on an annual basis." | | In reviewing the request for exemption, the NRC staff used the guidance from recent emergency preparedness (EP)-related decommissioning exemption reviews provided in Interim Staff Guidance (ISG) document - |
| Please provide further explanation as to why the State of Iowa and Harrison County, which are contiguous to the FCS site (directly across the Missouri River from the FCS site), are not planned to be part of any EAL annual review. Please provide any documentation of discussions with the State of Iowa and Harrison County indicating agreement with proposed change. RAI-NSIR/DPR-003 Proposed exemptions related to the notification and communications with State and local response organizations include: | | NSIR/DPR-ISG-02, Emergency Planning Exemption Requests For Decommissioning Nuclear Power Plants (ADAMS Accession No. ML14106A057). The staff also informed its review with guidance and regulations applicable to an Independent Spent Fuel Storage Installation (ISFSI). |
| * Exemption to 10 CFR 50.47(b)(5), as proposed in Table 1, Item 6 (page 8) to Attachment 1 states that "Procedures have been established for notification, by the licensee, of State and local response organizations-" | | Based on the NRC staff's initial review of OPPD's EP exemption request, the following requests for additional information (RAIs) are required to facilitate completion of the staff's technical review: |
| * Exemption to Section IV.D.3 of Appendix E to 10 CFR Part 50, as proposed in Table 2, Item 43 (page 26) to Attachment 1 continues to provide that "A licensee shall have the capability to notify responsible State and local government agencies within 15 minutes after declaring an emergency." | | RAI-NSIR/DPR-001 In Table 1, Exemptions Requested from 10 CFR 50.47(b) and 50.47(c)(2), Item 18 (page 12), to Attachment 1 of the December 16, 2016 letter, OPPD provides the basis for the exemption to 10 CFR 50.47(c)(2), which references the U.S. Environmental Protection Agency (EPA) document, entitled Protective Action Guides and Planning Guidance for Radiological Incidents, Draft for Interim Use and Public Comment, dated March 2013. It provides a quote from the referenced document that EPZs are not necessary at those facilities where it is not possible for PAGs to be exceeded off-site. Since OPPDs December 16, 2016 letter, EPA issued a revision to the PAG Manual: Protective Action Guides and Planning Guidance for Radiological Incidents, EPA-400/R-17/001, dated January 2017 (ADAMS Accession No. ML17044A073), which no longer includes the quote cited. |
| * Exemption to Section IV.E.9.a of Appendix E to 10 CFR Part 50, as proposed in Table 2, Item 65 (page 34) to Attachment 1 continues to provide that "Provision for communications with contiguous State/local governments within the plume exposure pathway EPZ. Such communications shall be tested monthly." However, in the Basis for Exemption for Item 43 (page 27) on Table 2 to Attachment 1, OPPD states, "FCS proposes to complete emergency notification to the State of Nebraska within 60 minutes after an emergency declaration or a change in classification." This appears to be inconsistent with Item 65 (page 33) of Table 2 to 3Attachment 1 where OPPD states, "FCS will maintain communications with the State of Nebraska, Washington County, and the NRC." [Emphasis added] a. Please clarify the apparent inconsistencies as to what communications will occur between FCS and the site's host county (Washington County, NE), as well as with Harrison County, IA, which is located contiguous to the FCS site. | | Please update the basis for the exemption in Table 1 to Attachment 1 accordingly, to reflect current Federal guidance provided in EPA-400/R-17/001. |
| b. The Basis for Exemption for Item 43 (page 27) on Table 2 also states the "Emergency management officials with both states have agreed that the proposed notification to Nebraska within 60 minutes is appropriate." Please provide documentation that the State of Iowa and Harrison County, which reside contiguous to the FCS site, concur in the proposed notification being exclusively to the State of Nebraska. In addition, if FCS does not propose to include Washington County in emergency notification, then documentation should include discussions with Washington County. Regards, | | RAI-NSIR/DPR-002 Section IV.B.1 of Appendix E to 10 CFR Part 50 states, in part that emergency action levels shall be reviewed with the State and local government authorities on an annual basis. OPPD proposes in Table 2, Exemptions Requested from 10 CFR 50, Appendix E, Item 37 (page 21), to Attachment 1 of the December 16, 2016 letter, to continue to review EALs with the State of Nebraska and Washington County on an annual basis. |
| | Please provide further explanation as to why the State of Iowa and Harrison County, which are contiguous to the FCS site (directly across the Missouri River from the FCS site), are not planned to be part of any EAL annual review. Please provide any documentation of discussions with the State of Iowa and Harrison County indicating agreement with proposed change. |
| | RAI-NSIR/DPR-003 Proposed exemptions related to the notification and communications with State and local response organizations include: |
| | * Exemption to 10 CFR 50.47(b)(5), as proposed in Table 1, Item 6 (page 8) to Attachment 1 states that Procedures have been established for notification, by the licensee, of State and local response organizations |
| | * Exemption to Section IV.D.3 of Appendix E to 10 CFR Part 50, as proposed in Table 2, Item 43 (page |
| | : 26) to Attachment 1 continues to provide that A licensee shall have the capability to notify responsible State and local government agencies within 15 minutes after declaring an emergency. |
| | * Exemption to Section IV.E.9.a of Appendix E to 10 CFR Part 50, as proposed in Table 2, Item 65 (page |
| | : 34) to Attachment 1 continues to provide that Provision for communications with contiguous State/local governments within the plume exposure pathway EPZ. Such communications shall be tested monthly. |
| | However, in the Basis for Exemption for Item 43 (page 27) on Table 2 to Attachment 1, OPPD states, FCS proposes to complete emergency notification to the State of Nebraska within 60 minutes after an emergency declaration or a change in classification. This appears to be inconsistent with Item 65 (page 33) of Table 2 to 2 |
| | where OPPD states, FCS will maintain communications with the State of Nebraska, Washington County, and the NRC. [Emphasis added] |
| | : a. Please clarify the apparent inconsistencies as to what communications will occur between FCS and the sites host county (Washington County, NE), as well as with Harrison County, IA, which is located contiguous to the FCS site. |
| | : b. The Basis for Exemption for Item 43 (page 27) on Table 2 also states the Emergency management officials with both states have agreed that the proposed notification to Nebraska within 60 minutes is appropriate. Please provide documentation that the State of Iowa and Harrison County, which reside contiguous to the FCS site, concur in the proposed notification being exclusively to the State of Nebraska. In addition, if FCS does not propose to include Washington County in emergency notification, then documentation should include discussions with Washington County. |
| | : Regards, Jim Kim Project Manager - Fort Calhoun Station NRR/DORL/LSPB 301-415-4125 3 |
|
| |
|
| Jim Kim Project Manager - Fort Calhoun Station NRR/DORL/LSPB 301-415-4125 Hearing Identifier: NRR_PMDA Email Number: 3412 Mail Envelope Properties (James.Kim@nrc.gov20170322133000)
| | Hearing Identifier: NRR_PMDA Email Number: 3412 Mail Envelope Properties (James.Kim@nrc.gov20170322133000) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| FORT CALHOUN STATION - FINAL NSIR/DPR RAI Regarding Proposed Emergency Planning Exemption (CAC NO. MF9067) Sent Date: 3/22/2017 1:30:06 PM Received Date: 3/22/2017 1:30:00 PM From: Kim, James Created By: James.Kim@nrc.gov Recipients: "BLOME, BRADLEY H" <bblome@oppd.com> Tracking Status: None "CAMERON, COREY A" <ccameron@oppd.com> Tracking Status: None "MATZKE, ERICK P" <ematzke@oppd.com> | | FORT CALHOUN STATION - FINAL NSIR/DPR RAI Regarding Proposed Emergency Planning Exemption (CAC NO. MF9067) |
| Tracking Status: None Post Office: Files Size Date & Time MESSAGE 7776 3/22/2017 1:30:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: | | Sent Date: 3/22/2017 1:30:06 PM Received Date: 3/22/2017 1:30:00 PM From: Kim, James Created By: James.Kim@nrc.gov Recipients: |
| }} | | "BLOME, BRADLEY H" <bblome@oppd.com> |
| | Tracking Status: None "CAMERON, COREY A" <ccameron@oppd.com> |
| | Tracking Status: None "MATZKE, ERICK P" <ematzke@oppd.com> |
| | Tracking Status: None Post Office: |
| | Files Size Date & Time MESSAGE 7776 3/22/2017 1:30:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| | Recipients Received:}} |
Letter Sequence RAI |
---|
|
|
MONTHYEARML17037D1622017-02-0707 February 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action - Request for Exemptions from 10 CFR 50.47 and 10 CFR 50 Appendix E, Reduce Emergency Planning Requirements for Permanently Defueled Condition (MF9067) Project stage: Acceptance Review LIC-17-0024, Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 4 of 4)2017-02-10010 February 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 4 of 4) Project stage: Supplement ML17041A4432017-02-10010 February 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 1 of 4) Project stage: Supplement ML17041A4442017-02-10010 February 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 2 of 4) Project stage: Supplement ML17041A2382017-02-15015 February 2017 Acceptance Review Letter, Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E to Allow Plant to Reduce Emergency Planning Requirements Consistent with Permanently Defueled Condition Project stage: Acceptance Review ML17039A6552017-03-0303 March 2017 Request for Withholding Information from Public Disclosure - 12/13/16 Affidavit Executed by G. Elliott, Areva Np; Calculation FC08513; Exemption Request to Reduce Emergency Planning Requirements for Permanently Defueled Condition Project stage: Withholding Request Acceptance ML17081A0192017-03-21021 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Proposed Emergency Planning Exemption Project stage: RAI ML17082A0022017-03-22022 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final Nsir/Dpr RAI Regarding Proposed Emergency Planning Exemption Project stage: RAI LIC-17-0037, Response to Request for Additional Information, Fort Calhoun Station, Unit No.1 - Final Request for Additional Information Concerning Exemption from the Requirements of 10 CFR 50.47 and Appendix E2017-04-14014 April 2017 Response to Request for Additional Information, Fort Calhoun Station, Unit No.1 - Final Request for Additional Information Concerning Exemption from the Requirements of 10 CFR 50.47 and Appendix E Project stage: Response to RAI LIC-17-0045, Response to Request for Additional Information Defueled Emergency Plan Exemption Request2017-04-20020 April 2017 Response to Request for Additional Information Defueled Emergency Plan Exemption Request Project stage: Response to RAI ML17164A2162017-06-12012 June 2017 FEMA Letter (J. Hoyes) to NRC Dated June 12, 2017: Proposed Commission Paper Language for the Fort Calhoun Station Emergency Plan Decommissioning Exemption Request Project stage: Other ML17261A4192017-11-21021 November 2017 Letter, Environmental Assessment and Finding of No Significant Impact Re Exemption Request from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition Project stage: Other ML17261A3432017-11-21021 November 2017 FRN, Environmental Assessment and Finding of No Significant Impact Re Exemption Request from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition Project stage: Other ML17263B1982017-12-11011 December 2017 Letter and Safety Evaluation, Request for Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003) Project stage: Approval ML17263B1912017-12-11011 December 2017 Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC No. MF9067; EPID L-2016-LLE-0003) Project stage: Approval ML17278A1782017-12-19019 December 2017 FRN, Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003) Project stage: Approval NRC-2017-0223, FRN, Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003)2017-12-19019 December 2017 FRN, Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003) Project stage: Approval 2017-02-07
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24289A2052024-10-0909 October 2024 E-mail with Responses to Clarification Questions on Response to Request for Additional Information on the Phase 1 Final Status Survey Reports ML24025A1792024-01-23023 January 2024 State Consultation Response e-mail on Fort Calhoun Station, Unit 1 License Termination Plan License Amendment– (License No. DPR-40, Docket No. 50-285) ML24024A2242024-01-22022 January 2024 State Consultation e-mail on Fort Calhoun Station, Unit 1 License Termination Plan License Amendment- (License No. DPR-40, Docket No. 50-285) ML23311A0862023-11-0505 November 2023 Letter to M Morales Re Ft Calhoun License Termination Section 7 Determination for Ipac 2022-0029456 ML23038A1882023-01-31031 January 2023 Request for Additional Time to Respond to Request for Additional Information on License Amendment Request for Approval of License Termination Plan (License No. DPR-40, Docket No. 50-285) ML22222A1192022-08-0808 August 2022 Email Section 106 NHPA- Ft Calhoun Station License Termination Plan ML21069A2482021-03-10010 March 2021 Umax, 07200054, 05000361, 05000362, FSAR Revision 4 for San Onofre ISFSI ML21335A3352021-01-25025 January 2021 January 25, 2021 e-mail from J. Parrott, NRC to C. Cameron, OPPD Use of Resrad Model to Represent Well Water Concentrations in a Basement Substructure (License No. DPR-40, Docket No. 50-285) ML20204B0782020-07-22022 July 2020 Donna Gilmore Email Holtec Umax Materials (07200054, 05000361, 05000362) ML20113F0622020-04-22022 April 2020 E-mail Results of Acceptance Review of OPPD Request for Exemption from 10 CFR 20, App G, Section Iii.E (License No. DPR-40, Docket No. 50-285) ML20100J2272020-03-26026 March 2020 E-mail Notification to the State of Nebraska on the Issuance of the License Amendment for Revised Security Plans to Reflect an ISFSI-only Configuration (License No. DPR-40, Docket Nos. 50-285 and 72-54) ML20100L7232020-03-15015 March 2020 Email: Town of Desoto National Register of Historic Places Eligibility ML19353C3612019-12-11011 December 2019 E-mail to State of Nebraska Informing of the Pending Revision to the Emergency Plan to Reflect Independent Spent Fuel Storage Installation Only Status (License DPR-40, Docket Nos. 50-285 and 72-054) ML19309F1112019-10-11011 October 2019 ISFSI-Only Tech Specs ML19241A1812019-08-21021 August 2019 Request for Additional Information on Proposed Changes to the FCS Emergency Plan and Emergency Action Level Scheme to Reflect an ISFSI-only Status ML19175A0212019-06-19019 June 2019 Acceptance Review - License Amendment Request to Revise Security and Safeguards Requirements to Reflect ISFSI-Only Configuration ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19126A2802019-05-0101 May 2019 Acceptance Review - License Amendment Request for ISFSI-Only EP and EAL Scheme ML18100A2712018-04-0909 April 2018 04-09-18 OPPD E-Mail (FCS Permanently Defueled Emergency Plan Implementation) ML17236A3462017-08-24024 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Permanently Defueled TS (MF9567) ML17236A3442017-08-24024 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun Exemption from 10 CFR 140.11(a)(4), Off-site Primary and Secondary Liability Insurance (MF9664) ML17234A4692017-08-22022 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Removal of Dry Cask Loading Limits (MF9831) ML17194A9732017-07-13013 July 2017 NRR E-mail Capture - Final RAI for Fort Calhoun Ultimate Strength Design for Aux. Bldg LAR (MF8525) ML17191B0212017-07-10010 July 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review of Modification of LC 3.C to Delete Commission-approved CSP ML17184A0042017-06-30030 June 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review of Removal of Dry Cask Loading Limits ML17139C8342017-05-19019 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Partial Exemption from Record Retention Requirements ML17139C5082017-05-19019 May 2017 NRR E-mail Capture - (External_Sender) Need Corrected Page 6 for LIC-17-0043 ML17144A0132017-05-19019 May 2017 NRR E-mail Capture - Fort Calhoun PSDAR - Findings and Concerns ML17142A0202017-05-19019 May 2017 NRR E-mail Capture - (External_Sender) Need Corrected Page 6 to TQ-DC-FC-101 ML17139B6762017-05-18018 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Exemption from 10 CFR 140.11(a)(4), Off-Site Liability Insurance ML17139B6782017-05-18018 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Exemption from 10 CFR 50.54(w)(1), On-Site Property Damage Insurance ML17136A1692017-05-16016 May 2017 NRR E-mail Capture - (External_Sender) OPPD FCS Decommissioning Financial Reports ML17115A4722017-04-25025 April 2017 NRR E-mail Capture - (External_Sender) Corrected Page 18 to TQ-DC-FC-201 ML17114A3112017-04-24024 April 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review TS Changes to Align for Decommissioning ML17112A0362017-04-20020 April 2017 NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Permanently Defueled EP and EAL Scheme Change LAR ML17090A3942017-03-31031 March 2017 NRR E-mail Capture - Fort Calhoun - Final RAI Regarding Administrative Control TS Change LAR (MF8437) ML17082A0022017-03-22022 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final Nsir/Dpr RAI Regarding Proposed Emergency Planning Exemption ML17081A0192017-03-21021 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Proposed Emergency Planning Exemption ML17052A0272017-02-15015 February 2017 NRR E-mail Capture - Fort Calhoun Station, Unit No. 1 - Acceptance of Requested Amendment Revise Permanently Defueled Emergency Plan and EAL Scheme ML17033A9692017-02-0202 February 2017 NRR E-mail Capture - Fort Calhoun Station - Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment ML16351A0432016-12-15015 December 2016 NRR E-mail Capture - (External_Sender) Fort Calhoun Station Offsite Response Organizations ML16350A0392016-12-15015 December 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8858) Fort Calhoun, Unit 1 - License Amendment Request (LAR) 16-06; Removal of License Condition 3.D., Fire Protection Program ML16334A3002016-11-29029 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8525) Fort Calhoun, Unit 1 - License Amendment Request LAR-16-04 to Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements ML16333A2312016-11-28028 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8843)Fort Calhoun, Unit 1, Request for Rescission of Interim Compensatory Measure B.1.a from EA-02-026, Order for Interim Safeguards and Security Compensatory Measures. ML16333A0992016-11-28028 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8452), Fort Calhoun, Unit 1 - Request for Exemption from Specific Provisions in 10 CFR 73.55 ML16286A0812016-10-12012 October 2016 NRR E-mail Capture - Acceptance Review Fort Calhoun Station, Unit 1, License Amendment Request 16-03, Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning ML16278A0292016-10-0303 October 2016 NRR E-mail Capture - Acceptance Review Fort Calhoun Station Radiological Emergency Response Plan (RERP) for Decommissioning ML16257A0262016-09-12012 September 2016 NRR E-mail Capture - (External_Sender) OPPD Slides for 9/13/16 Pre-Application Meeting on Class 1 Structures ML16207A0182016-07-22022 July 2016 NRR E-mail Capture - Acceptance Review ML16137A0092016-05-16016 May 2016 NRR E-mail Capture - Acceptance Review CAC No. MF7574 2024-10-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24243A1042024-09-12012 September 2024 Proposed Revision to the OPPD FCS DQAP - Request for Additional Information (License No. DPR-40, Docket Nos. 50-285, 72-054, and 71-0256) ML24180A2062024-07-0808 July 2024 Phase 1 Final Status Survey Reports Request for Additional Information ML23151A0042023-06-0606 June 2023 Second Set RAIs Rev 4 ML22357A0672022-12-30030 December 2022 Enclosure RAI Re Approval of License Termination Plan ML22119A2472022-05-0303 May 2022 Review of Amendment Request to Add a LC to Include LTP Requirements, RAI for Environmental Review ML20111A2162020-05-20020 May 2020 Revised PSDAR Request for Additional Information - RAI ML19241A1812019-08-21021 August 2019 Request for Additional Information on Proposed Changes to the FCS Emergency Plan and Emergency Action Level Scheme to Reflect an ISFSI-only Status ML18067A1432018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to M. J. Fisher Request for Additional Information Regarding Omaha Public Power District'S Decommissioning Funding Plan Update for Fort Calhoun Station ISFSI) ML17236A3462017-08-24024 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Permanently Defueled TS (MF9567) ML17236A3442017-08-24024 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun Exemption from 10 CFR 140.11(a)(4), Off-site Primary and Secondary Liability Insurance (MF9664) ML17234A4692017-08-22022 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Removal of Dry Cask Loading Limits (MF9831) ML17194A9732017-07-13013 July 2017 NRR E-mail Capture - Final RAI for Fort Calhoun Ultimate Strength Design for Aux. Bldg LAR (MF8525) ML17112A0362017-04-20020 April 2017 NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Permanently Defueled EP and EAL Scheme Change LAR ML17090A3942017-03-31031 March 2017 NRR E-mail Capture - Fort Calhoun - Final RAI Regarding Administrative Control TS Change LAR (MF8437) ML17082A0022017-03-22022 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final Nsir/Dpr RAI Regarding Proposed Emergency Planning Exemption ML17081A0192017-03-21021 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Proposed Emergency Planning Exemption ML17067A3862017-03-15015 March 2017 Request for Additional Information, Request for Approval of Certified Fuel Handler Training and Retraining Program to Facilitate Activities Associated with Decommissioning and Irradiated Fuel Handling Management ML17033A9692017-02-0202 February 2017 NRR E-mail Capture - Fort Calhoun Station - Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment ML16263A0492016-09-20020 September 2016 Request for Additional Information, Request for Approval of Certified Fuel Handler Training and Retraining Program to Facilitate Activities Associated with Decommissioning and Irradiated Fuel Handling Management ML16174A1502016-06-27027 June 2016 Request for Additional Information, Relief Request, Use of Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML16146A1782016-05-27027 May 2016 Request for Additional Information, Round 2, Request to Revise Current Licensing Basis as Described in the Final Safety Analysis Report to Allow Equipment Classification Methodology from ANSI/ANS-58.14-2011 ML16106A0232016-04-29029 April 2016 Request for Additional Information, Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML16104A2872016-04-25025 April 2016 Request for Additional Information, License Amendment Request to Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength Requirements ML16048A1542016-02-23023 February 2016 Request for Additional Information, License Amendment Request, Revise Current Licensing Basis as Described in the Final Safety Analysis Report to Allow Equipment Classification Methodology from ANSI/ANS-58.14-2011 ML16048A0242016-02-23023 February 2016 Request for Additional Information, License Amendment Request to Adopt Technical Specification Task Force (TSTF)-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML15343A1082015-12-15015 December 2015 Request for Additional Information, License Amendment Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a Definition ML15323A0362015-11-24024 November 2015 Request for Additional Information, Relief Requests P-1 - LPSI and CS Pumps and P-2 - Adjusting Hydraulic Parameters Consistent W/Code Case OMN-21, Fifth 10-Year Inservice Testing Interval ML15194A2722015-07-14014 July 2015 Request for Additional Information, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML15057A0152015-03-0303 March 2015 Request for Additional Information, Materials Reliability Program (MRP)-227-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines, Implementation Review ML15043A0612015-02-25025 February 2015 Request for Additional Information, Round 2, License Amendment Request to Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section III ML14353A0512014-12-22022 December 2014 Request for Additional Information, Request to Revise Updated Safety Analysis Report, Design and Evaluation of Seismic Class I Structures Using Ascm (Alternate Seismic Criteria and Methodologies) Developed Floor Response Spectra ML14259A3652014-09-24024 September 2014 Request for Additional Information, License Amendment Request to Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section III ML14195A0862014-07-16016 July 2014 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Hazard and Screening Report ML13317A5832013-11-25025 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13290A0022013-10-0909 October 2013 Request for Additional Information Email, License Amendment Request to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks ML13282A5362013-10-0909 October 2013 Request for Additional Information Email, Round 2, Exemption Request, Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) ML13270A2872013-09-27027 September 2013 Email, Request for Additional Information Round 4 (Apla), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) ML13261A2122013-09-18018 September 2013 Request for Additional Information Email, Exemption Request, Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) ML13233A2482013-08-26026 August 2013 Supplemental Information Needed for Acceptance of Requested Licensing Action; Request for Exemption, Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage in Lieu of 10 CFR 26.205(d)(7) ML13235A1682013-08-23023 August 2013 Draft Request for Additional Information Email, Overall Integrated Plan in Response to 3/12/2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) ML13234A4352013-08-22022 August 2013 Request for Additional Information Email, Round 2, Request to Revise TS 2.0.1, General Requirements, and TS 2.7, Electrical Systems, for Inoperable System, Subsystem. or Component Due to Inoperable Power Source ML13226A1222013-08-14014 August 2013 Email, Request for Additional Information Round 3 (Apla), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) ML13212A0092013-07-30030 July 2013 Request for Additional Information Email, Request to Revise Technical Specification (TS) 2.0.1, General Requirements, and TS 2.7, Electrical Systems, for Inoperable System, Subsystem, or Component Due to Inoperable Power Source ML13205A1252013-07-24024 July 2013 Request for Additional Information Email Round 2, Exigent Amendment Request to Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile Impact ML13205A0182013-07-23023 July 2013 Request for Additional Information Email, Exigent License Amendment Request to Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile Impact ML13144A4822013-05-23023 May 2013 Request for Additional Information Email, Decommissioning Funding Status Report ML13100A1752013-04-10010 April 2013 Request for Additional Information Email, Request for One-Time Exemption from Requirements of 10 CFR 26.205(d)(7) to Allow Less Restrictive Working Hour Limitations to Support Activities for Plant Startup ML13086A4732013-03-27027 March 2013 Request for Additional Information Email, Request to Revise Technical Specification 2.16, River Level, and Establish EAL Classification Criteria for External Flooding Events Under Radiological Emergency Response Plan ML13120A0842013-03-22022 March 2013 Request for Additional Information Email Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 20 (TAC No. D91660) 2024-09-12
[Table view] |
Text
NRR-PMDAPEm Resource From: Kim, James Sent: Wednesday, March 22, 2017 1:30 PM To: MATZKE, ERICK P Cc: BLOME, BRADLEY H; CAMERON, COREY A
Subject:
FORT CALHOUN STATION - FINAL NSIR/DPR RAI Regarding Proposed Emergency Planning Exemption (CAC NO. MF9067)
Final Request for Additional Information On March 16, 2017, the U.S. Nuclear Regulatory Commission (NRC) staff sent Fort Calhoun Station (FCS) the draft Request for Additional Information (RAI). This RAI relates to exemptions from portions of Part 50 of Title 10 of the Code of Federal Regulations (10 CFR Part 50) for the FCS Radiological Emergency Response Plan.
On March 22, 2017, a teleconference between FCS and NRC staff was held to discuss the information requested by the NRC staff was understood and any additional clarifications on the RAI were required. Based on the teleconference, FCS determined that the information requested by the NRC staff was clearly understood and any other additional clarifications on the RAI was not necessary. FCS agreed to provide a response to this final RAI shown below within 30 days from the date of this correspondence. The NRC staff also informed the licensee that a publicly available version of this final RAI would be placed in the NRCs Agencywide Documents Access and Management System.
REQUEST FOR ADDITIONAL INFORMATION EXEMPTION FROM THE REQUIREMENTS OF 10 CFR 50.47 AND APPENDIX E OMAHA PUBLIC POWER DISTRICT FORT CALHOUN STATION DOCKET NO. 50-285 By letter dated June 24, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16176A213), supplemented by letter dated August 25, 2016 (Accession No. ML16242A127), OPPD submitted certification to the U.S. Nuclear Regulatory Commission (NRC) indicating its intention to permanently cease power operations at the FCS facility on October 24, 2016, pursuant to10 CFR 50.82(a)(1)(i). By letter dated November 13, 2016 (Accession No. ML16319A254), OPPD submitted a certification to the NRC of the removal of fuel from the reactor vessel, pursuant to 10 CFR 50.82(a)(1)(ii). Upon docketing of the certifications, the 10 CFR Part 50 license for FCS no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel, as specified in 10 CFR 50.82(a)(2).
By letter dated December 16, 2016 (Agency-wide Documents Access and Management System (ADAMS)
Accession No. ML16356A578), as supplemented by letter dated February 10, 2017 (ADAMS Accession No. ML17041A443), Omaha Public Power District (OPPD) requested exemptions from portions of Part 50 of Title 10 of the Code of Federal Regulations (10 CFR Part 50) for the Fort Calhoun Station (FCS) Radiological Emergency Response Plan. Specifically, OPPD requested exemption from certain Emergency Plan Requirements contained in 10 CFR 50.47(b), 10 CFR 50.47(c)(2), and Section IV to Appendix E of 10 CFR Part 50. The requested exemptions would allow OPPD to modify the FCS emergency plan commensurate with the reduced likelihood of significant radiological events presented by the permanently defueled condition of the reactor and low decay heat rate of the stored fuel.
1
In reviewing the request for exemption, the NRC staff used the guidance from recent emergency preparedness (EP)-related decommissioning exemption reviews provided in Interim Staff Guidance (ISG) document -
NSIR/DPR-ISG-02, Emergency Planning Exemption Requests For Decommissioning Nuclear Power Plants (ADAMS Accession No. ML14106A057). The staff also informed its review with guidance and regulations applicable to an Independent Spent Fuel Storage Installation (ISFSI).
Based on the NRC staff's initial review of OPPD's EP exemption request, the following requests for additional information (RAIs) are required to facilitate completion of the staff's technical review:
RAI-NSIR/DPR-001 In Table 1, Exemptions Requested from 10 CFR 50.47(b) and 50.47(c)(2), Item 18 (page 12), to Attachment 1 of the December 16, 2016 letter, OPPD provides the basis for the exemption to 10 CFR 50.47(c)(2), which references the U.S. Environmental Protection Agency (EPA) document, entitled Protective Action Guides and Planning Guidance for Radiological Incidents, Draft for Interim Use and Public Comment, dated March 2013. It provides a quote from the referenced document that EPZs are not necessary at those facilities where it is not possible for PAGs to be exceeded off-site. Since OPPDs December 16, 2016 letter, EPA issued a revision to the PAG Manual: Protective Action Guides and Planning Guidance for Radiological Incidents, EPA-400/R-17/001, dated January 2017 (ADAMS Accession No. ML17044A073), which no longer includes the quote cited.
Please update the basis for the exemption in Table 1 to Attachment 1 accordingly, to reflect current Federal guidance provided in EPA-400/R-17/001.
RAI-NSIR/DPR-002 Section IV.B.1 of Appendix E to 10 CFR Part 50 states, in part that emergency action levels shall be reviewed with the State and local government authorities on an annual basis. OPPD proposes in Table 2, Exemptions Requested from 10 CFR 50, Appendix E, Item 37 (page 21), to Attachment 1 of the December 16, 2016 letter, to continue to review EALs with the State of Nebraska and Washington County on an annual basis.
Please provide further explanation as to why the State of Iowa and Harrison County, which are contiguous to the FCS site (directly across the Missouri River from the FCS site), are not planned to be part of any EAL annual review. Please provide any documentation of discussions with the State of Iowa and Harrison County indicating agreement with proposed change.
RAI-NSIR/DPR-003 Proposed exemptions related to the notification and communications with State and local response organizations include:
- Exemption to 10 CFR 50.47(b)(5), as proposed in Table 1, Item 6 (page 8) to Attachment 1 states that Procedures have been established for notification, by the licensee, of State and local response organizations
- Exemption to Section IV.D.3 of Appendix E to 10 CFR Part 50, as proposed in Table 2, Item 43 (page
- 26) to Attachment 1 continues to provide that A licensee shall have the capability to notify responsible State and local government agencies within 15 minutes after declaring an emergency.
- Exemption to Section IV.E.9.a of Appendix E to 10 CFR Part 50, as proposed in Table 2, Item 65 (page
- 34) to Attachment 1 continues to provide that Provision for communications with contiguous State/local governments within the plume exposure pathway EPZ. Such communications shall be tested monthly.
However, in the Basis for Exemption for Item 43 (page 27) on Table 2 to Attachment 1, OPPD states, FCS proposes to complete emergency notification to the State of Nebraska within 60 minutes after an emergency declaration or a change in classification. This appears to be inconsistent with Item 65 (page 33) of Table 2 to 2
where OPPD states, FCS will maintain communications with the State of Nebraska, Washington County, and the NRC. [Emphasis added]
- a. Please clarify the apparent inconsistencies as to what communications will occur between FCS and the sites host county (Washington County, NE), as well as with Harrison County, IA, which is located contiguous to the FCS site.
- b. The Basis for Exemption for Item 43 (page 27) on Table 2 also states the Emergency management officials with both states have agreed that the proposed notification to Nebraska within 60 minutes is appropriate. Please provide documentation that the State of Iowa and Harrison County, which reside contiguous to the FCS site, concur in the proposed notification being exclusively to the State of Nebraska. In addition, if FCS does not propose to include Washington County in emergency notification, then documentation should include discussions with Washington County.
- Regards, Jim Kim Project Manager - Fort Calhoun Station NRR/DORL/LSPB 301-415-4125 3
Hearing Identifier: NRR_PMDA Email Number: 3412 Mail Envelope Properties (James.Kim@nrc.gov20170322133000)
Subject:
FORT CALHOUN STATION - FINAL NSIR/DPR RAI Regarding Proposed Emergency Planning Exemption (CAC NO. MF9067)
Sent Date: 3/22/2017 1:30:06 PM Received Date: 3/22/2017 1:30:00 PM From: Kim, James Created By: James.Kim@nrc.gov Recipients:
"BLOME, BRADLEY H" <bblome@oppd.com>
Tracking Status: None "CAMERON, COREY A" <ccameron@oppd.com>
Tracking Status: None "MATZKE, ERICK P" <ematzke@oppd.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 7776 3/22/2017 1:30:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: