MONTHYEARML17037D1622017-02-0707 February 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action - Request for Exemptions from 10 CFR 50.47 and 10 CFR 50 Appendix E, Reduce Emergency Planning Requirements for Permanently Defueled Condition (MF9067) Project stage: Acceptance Review LIC-17-0024, Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 4 of 4)2017-02-10010 February 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 4 of 4) Project stage: Supplement ML17041A4432017-02-10010 February 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 1 of 4) Project stage: Supplement ML17041A4442017-02-10010 February 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 2 of 4) Project stage: Supplement ML17041A2382017-02-15015 February 2017 Acceptance Review Letter, Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E to Allow Plant to Reduce Emergency Planning Requirements Consistent with Permanently Defueled Condition Project stage: Acceptance Review ML17039A6552017-03-0303 March 2017 Request for Withholding Information from Public Disclosure - 12/13/16 Affidavit Executed by G. Elliott, Areva Np; Calculation FC08513; Exemption Request to Reduce Emergency Planning Requirements for Permanently Defueled Condition Project stage: Withholding Request Acceptance ML17081A0192017-03-21021 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Proposed Emergency Planning Exemption Project stage: RAI ML17082A0022017-03-22022 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final Nsir/Dpr RAI Regarding Proposed Emergency Planning Exemption Project stage: RAI LIC-17-0037, Response to Request for Additional Information, Fort Calhoun Station, Unit No.1 - Final Request for Additional Information Concerning Exemption from the Requirements of 10 CFR 50.47 and Appendix E2017-04-14014 April 2017 Response to Request for Additional Information, Fort Calhoun Station, Unit No.1 - Final Request for Additional Information Concerning Exemption from the Requirements of 10 CFR 50.47 and Appendix E Project stage: Response to RAI LIC-17-0045, Response to Request for Additional Information Defueled Emergency Plan Exemption Request2017-04-20020 April 2017 Response to Request for Additional Information Defueled Emergency Plan Exemption Request Project stage: Response to RAI ML17164A2162017-06-12012 June 2017 FEMA Letter (J. Hoyes) to NRC Dated June 12, 2017: Proposed Commission Paper Language for the Fort Calhoun Station Emergency Plan Decommissioning Exemption Request Project stage: Other ML17261A4192017-11-21021 November 2017 Letter, Environmental Assessment and Finding of No Significant Impact Re Exemption Request from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition Project stage: Other ML17261A3432017-11-21021 November 2017 FRN, Environmental Assessment and Finding of No Significant Impact Re Exemption Request from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition Project stage: Other ML17263B1982017-12-11011 December 2017 Letter and Safety Evaluation, Request for Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003) Project stage: Approval ML17263B1912017-12-11011 December 2017 Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC No. MF9067; EPID L-2016-LLE-0003) Project stage: Approval ML17278A1782017-12-19019 December 2017 FRN, Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003) Project stage: Approval NRC-2017-0223, FRN, Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003)2017-12-19019 December 2017 FRN, Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003) Project stage: Approval 2017-02-07
[Table View] |
|
---|
Category:Federal Register Notice
MONTHYEARML23333A1092023-12-27027 December 2023 Federal Register Notice - Fort Calhoun Station, Unit 1, License Termination Plan Finding of No Significant Impact ML22178A0472022-07-0404 July 2022 Enclosure - Federal Register Notice - Fort Calhoun Station, Unit 1 - FRN on Public Meeting and Request for Comment on License Termination Plan (License No. DPR-40, Docket No. 50-285) ML21055A4002021-05-14014 May 2021 Enclosure 1: Environmental Assessments and Findings of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans Federal Register Notice ML19179A1242019-07-11011 July 2019 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI & SGI & Order Imposing Procedures for Access to SUNSI & SGI: August 6, 2019 ML18318A3602018-11-19019 November 2018 FRN Document for Partial Site Release Requests (License DPR-40,Docket Nos. 50-285 and 72-54) NRC-2017-0238, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 20182017-12-21021 December 2017 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 ML17353A1922017-12-21021 December 2017 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 NRC-2017-0223, FRN, Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003)2017-12-19019 December 2017 FRN, Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003) ML17278A1782017-12-19019 December 2017 FRN, Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003) ML17261A3432017-11-21021 November 2017 FRN, Environmental Assessment and Finding of No Significant Impact Re Exemption Request from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition ML17172A7352017-10-0404 October 2017 FRN, Partial Exemption from 10 CFR 50, Appendix B, 10 CFR 50.59(d)(3), and 10 CFR 50.71(c) Regarding Record Retention Requirements NRC-2017-0202, FRN, Partial Exemption from 10 CFR 50, Appendix B, 10 CFR 50.59(d)(3), and 10 CFR 50.71(c) Regarding Record Retention Requirements2017-10-0404 October 2017 FRN, Partial Exemption from 10 CFR 50, Appendix B, 10 CFR 50.59(d)(3), and 10 CFR 50.71(c) Regarding Record Retention Requirements NRC-2017-0175, Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 20172017-08-0404 August 2017 Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 2017 ML17213A1842017-08-0404 August 2017 Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 2017 NRC-2017-0160, FRN, Request for Exemption from Specific Provisions in 10 CFR 73.55 Related to Suspension of Security Measures for Licensed Senior Operator or Certified Fuel Handler2017-07-0707 July 2017 FRN, Request for Exemption from Specific Provisions in 10 CFR 73.55 Related to Suspension of Security Measures for Licensed Senior Operator or Certified Fuel Handler ML17067A3422017-07-0707 July 2017 FRN, Request for Exemption from Specific Provisions in 10 CFR 73.55 Related to Suspension of Security Measures for Licensed Senior Operator or Certified Fuel Handler NRC-2017-0099, FRN, Notification of the Availability of the Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate and Notice of Meeting to Discuss and Accept Comments2017-04-0707 April 2017 FRN, Notification of the Availability of the Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate and Notice of Meeting to Discuss and Accept Comments ML17094A7952017-04-0707 April 2017 Letter, Notification of the Availability of Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate and Notice of Meeting to Discuss and Accept Comments ML17094A7972017-04-0707 April 2017 FRN, Notification of the Availability of the Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate and Notice of Meeting to Discuss and Accept Comments ML16232A0892016-08-24024 August 2016 Letter, Withdrawal of an Amendment Request, Changes to Fire Protection License Condition Revised Commitment to Modify Plant Systems as Part of NFPA 805 Implementation ML16232A0882016-08-24024 August 2016 FRN, Withdrawal of an Amendment Request, Changes to Fire Protection License Condition Revised Commitment to Modify Plant Systems as Part of NFPA 805 Implementation NRC-2016-0096, FRN, Withdrawal of an Amendment Request, Changes to Fire Protection License Condition Revised Commitment to Modify Plant Systems as Part of NFPA 805 Implementation2016-08-24024 August 2016 FRN, Withdrawal of an Amendment Request, Changes to Fire Protection License Condition Revised Commitment to Modify Plant Systems as Part of NFPA 805 Implementation NRC-2016-0040, FRN, Withdrawal of Requested Licensing Action, License Amendment Request to Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength Requirements2016-08-0202 August 2016 FRN, Withdrawal of Requested Licensing Action, License Amendment Request to Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength Requirements ML16209A3692016-08-0202 August 2016 Letter, Withdrawal of Requested Licensing Action, License Amendment Request to Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength Requirements ML16209A3702016-08-0202 August 2016 FRN, Withdrawal of Requested Licensing Action, License Amendment Request to Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength Requirements ML16173A1222016-06-24024 June 2016 FRN, Withdrawal of Requested Licensing Action, Request to Revise Current Licensing Basis as Described in the Final Safety Analysis Report to Allow Equipment Classification Methodology from ANSI/ANS-58.14-2011 ML16061A3012016-03-0202 March 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: March 15, 2016 ML15356A5992015-12-29029 December 2015 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 5, 2016 NRC-2015-0269, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: December 8, 20152015-11-27027 November 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: December 8, 2015 ML15328A5502015-11-27027 November 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: December 8, 2015 ML15231A8382015-08-21021 August 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - September 1, 2015 NRC-2015-0204, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - September 1, 20152015-08-21021 August 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - September 1, 2015 NRC-2012-0014, G20110506/LTR-11-0402/EDATS: SECY-2011-0402, G20110492/LTR-11-0382/EDATS: OEDO-2011-0387 - FRN, 2.206 Final Director'S Decision, Petitioner Thomas Saporito Related to Cooper Nuclear Station and Fort Calhoun Station (TAC Nos. ME6681 and2015-06-0303 June 2015 G20110506/LTR-11-0402/EDATS: SECY-2011-0402, G20110492/LTR-11-0382/EDATS: OEDO-2011-0387 - FRN, 2.206 Final Director'S Decision, Petitioner Thomas Saporito Related to Cooper Nuclear Station and Fort Calhoun Station (TAC Nos. ME6681 and ME66 ML15128A1432015-06-0303 June 2015 G20110506/LTR-11-0402/EDATS: SECY-2011-0402, G20110492/LTR-11-0382/EDATS: OEDO-2011-0387 - FRN, 2.206 Final Director'S Decision, Petitioner Thomas Saporito Related to Cooper Nuclear Station and Fort Calhoun Station ML15062A3732015-04-15015 April 2015 G20110506/LTR-11-0402 and G20110492/LTR-11-0382 - 2.206 Proposed Director'S Decision, Petitioner Thomas Saporito Related to Cooper Nuclear Station and Fort Calhoun Station ML15092A1842015-04-0606 April 2015 FRN, Withdrawal of License Amendment Request to Revise Updated Safety Analysis Report, to Permit Use of Design and Evaluation of Seismic Class I Structures Using Ascm Developed Floor Response Spectra ML15092A1822015-04-0606 April 2015 Letter, Withdrawal of License Amendment Request to Revise Updated Safety Analysis Report, to Permit Use of Design and Evaluation of Seismic Class I Structures Using Ascm Developed Floor Response Spectra NRC-2014-0159, FRN, Withdrawal of License Amendment Request to Revise Updated Safety Analysis Report, to Permit Use of Design and Evaluation of Seismic Class I Structures Using Ascm Developed Floor Response Spectra2015-04-0606 April 2015 FRN, Withdrawal of License Amendment Request to Revise Updated Safety Analysis Report, to Permit Use of Design and Evaluation of Seismic Class I Structures Using Ascm Developed Floor Response Spectra ML15022A6532015-01-26026 January 2015 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 3, 2015 ML14311A6612014-11-10010 November 2014 FRN, Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months NRC-2014-0249, FRN, Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months2014-11-10010 November 2014 FRN, Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months ML14311A6602014-11-10010 November 2014 Letter, Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months NRC-2014-0193, Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 2, 20142014-08-22022 August 2014 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 2, 2014 ML14233A2082014-08-22022 August 2014 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 2, 2014 ML14204A5782014-07-25025 July 2014 Notice of Withdrawal of License Amendment Application, Revise TS 2.0.1, General Requirements, and TS 2.7, Electrical Systems, for Inoperable System, Subsystem, or Component Due to Inoperable Power Source ML14204A5922014-07-25025 July 2014 FRN, Notice of Withdrawal of License Amendment Application, Revise TS 2.0.1, General Requirements, and TS 2.7, Electrical Systems, for Inoperable System, Subsystem, or Component Due to Inoperable Power Source ML14177A6452014-06-27027 June 2014 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations NRC-2014-0028, Biweekly Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 18, 20142014-02-10010 February 2014 Biweekly Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 18, 2014 ML14037A4142014-02-10010 February 2014 Biweekly Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 18, 2014 ML13274A0262013-10-28028 October 2013 FRN, Exemption Related to Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) Requirements 2023-12-27
[Table view] |
Text
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-285; NRC-2017-0223]
Omaha Public Power District; Fort Calhoun Station, Unit No. 1 AGENCY: Nuclear Regulatory Commission.
ACTION: Environmental assessment and finding of no significant impact; issuance.
SUMMARY
- The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of exemptions in response to a request from Omaha Public Power District (OPPD or the licensee) that would permit the licensee to reduce its emergency planning (EP) activities at the Fort Calhoun Station, Unit No. 1 (Fort Calhoun). The licensee is seeking exemptions that would eliminate the requirements for the licensee to maintain formal offsite radiological emergency plans, and reduce some of the onsite EP activities, based on the reduced risks at Fort Calhoun, which is permanently shutdown and defueled.
However, requirements for certain onsite capabilities to communicate and coordinate with offsite response authorities, in the event of an emergency at Fort Calhoun, would be retained. The NRC staff is issuing an environmental assessment (EA) and finding of no significant impact (FONSI) associated with the proposed exemptions.
DATES: The EA and FONSI referenced in this document are available on November 21, 2017.
ADDRESSES: Please refer to Docket ID NRC-2017-0223 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods:
- Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0223. Address questions about NRC dockets to Carol Gallagher; telephone: 301-415-3463; e-mail: Carol.Gallagher@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
- NRCs Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ADAMS Public Documents and then select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. For the convenience of the reader, the ADAMS accession numbers are provided in a table in the Availability of Documents section of this document.
- NRCs PDR: You may examine and purchase copies of public documents at the NRCs PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: James Kim, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; telephone: 301-415-4125; e-mail: James.Kim@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction Fort Calhoun is a permanently shutdown and defueled nuclear power plant, located in Washington County, Nebraska, which is in the process of decommissioning.
2
The licensee is the holder of Renewed Facility Operating License No. DPR-40 for operation of Fort Calhoun. Fort Calhoun has been shut down since October 24, 2016, and the final removal of fuel from its reactor vessel was completed on November 13, 2016. By letter dated November 13, 2016, OPPD submitted to the NRC a certification of the permanent cessation of power operations at Fort Calhoun and the permanent removal of fuel from the Fort Calhoun reactor vessel. As a permanently shutdown and defueled facility, and pursuant to section 50.82(a)(2) of title 10 of the Code of Federal Regulations (10 CFR), Fort Calhoun is no longer authorized to be operated or to have fuel placed into its reactor vessel. However, the licensee is still authorized to possess and store irradiated nuclear fuel, which is currently stored onsite at Fort Calhoun in a spent fuel pool and in an independent spent fuel storage installation.
The licensee has requested exemptions for Fort Calhoun from certain EP requirements in 10 CFR part 50, Domestic Licensing of Production and Utilization Facilities. The NRC regulations concerning EP do not recognize the reduced risks after a reactor is permanently shut down and defueled. As such, a permanently shutdown and defueled reactor such as Fort Calhoun must continue to maintain the same EP requirements as an operating power reactor under the existing regulatory requirements.
To establish a level of EP commensurate with the reduced risks of a permanently shutdown and defueled reactor, OPPD requires exemptions from certain EP regulatory requirements before it can change its emergency plans.
The NRC is considering issuing exemptions from portions of 10 CFR 50.47, Emergency plans, and 10 CFR part 50, appendix E, Emergency Planning and Preparedness for Production and Utilization Facilities, to OPPD, which would eliminate the requirements for OPPD to maintain offsite radiological emergency plans and reduce some of the onsite EP activities, based on the reduced risks at Fort Calhoun, due to its permanently shutdown and defueled status. Consistent with 10 CFR 51.21, the NRC 3
has reviewed the requirements in 10 CFR 51.20(b) and 10 CFR 51.22(c) and determined that an EA is the appropriate form of environmental review for the requested action. Based on the results of the EA, which is provided in Section II of this document, the NRC has determined not to prepare an environmental impact statement for the proposed action, and is issuing a FONSI.
II. Environmental Assessment Description of the Proposed Action The proposed action would exempt OPPD from meeting certain requirements set forth in 10 CFR 50.47 and appendix E to 10 CFR part 50. More specifically, OPPD requested exemptions from: 1) certain requirements in 10 CFR 50.47(b) regarding onsite and offsite emergency response plans for nuclear power reactors; 2) certain requirements in 10 CFR 50.47(c)(2) to establish plume exposure and ingestion pathway emergency planning zones for nuclear power reactors; and 3) certain requirements in 10 CFR part 50, appendix E, section IV, which establishes the elements that make up the content of a licensees emergency plan. The proposed action of granting these exemptions would eliminate the requirements for OPPD to maintain formal offsite radiological emergency plans, as described in 44 CFR part 350, and reduce some of the onsite EP activities at Fort Calhoun, based on the reduced risks at the permanently shutdown and defueled reactor. However, requirements for certain onsite capabilities to communicate and coordinate with offsite response authorities, in the event of an emergency at Fort Calhoun, would be retained. Additionally, if necessary, offsite protective actions could still be implemented using a comprehensive emergency management plan (CEMP) process. A CEMP in this context, also referred to as an emergency operations plan, is addressed in the Federal Emergency Management 4
Agencys Comprehensive Preparedness Guide (CPG) 101. The CPG 101 is the foundation for State, territorial, Tribal, and local EP in the United States. It promotes a common understanding of the fundamentals of risk-informed planning and decision making, and helps planners at all levels of government in their efforts to develop and maintain viable, all-hazards, all-threats emergency plans. An emergency operations plan is flexible enough for use in all emergencies. It describes how people and property will be protected; details regarding who is responsible for carrying out specific actions; identifies the personnel, equipment, facilities, supplies, and other resources available; and outlines the process by which all actions will be coordinated. A CEMP is often referred to as a synonym for all-hazards planning.
The proposed action is in accordance with the licensees application dated December 16, 2016, as supplemented by letters dated February 10, April 14, and April 20, 2017, in which OPPD provided responses to the NRC staffs requests for additional information concerning the proposed exemptions.
Need for the Proposed Action The proposed action is needed for OPPD to revise Fort Calhouns Emergency Plan to reflect the permanently shutdown and defueled status of the facility. The EP requirements currently applicable to Fort Calhoun are for an operating power reactor.
There are no explicit regulatory provisions distinguishing EP requirements for a power reactor that has been permanently shut down and defueled, from those for an operating power reactor. Therefore, since the 10 CFR part 50 license for Fort Calhoun no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel, as specified in 10 CFR 50.82(a)(2), the occurrence of postulated accidents associated with reactor operation is no longer credible.
5
In its exemption request, the licensee identified the remaining possible accidents at Fort Calhoun in its permanently shutdown and defueled condition. The NRC staff evaluated these possible radiological accidents, as memorialized in the Commission Paper (SECY)-17-0080, Request by the Omaha Public Power District for Exemptions from Certain Emergency Planning Requirements for the Fort Calhoun Station, Unit No. 1, dated August 10, 2017. In SECY-17-0080, the NRC staff stated that it had verified that OPPDs analyses and calculations provided reasonable assurance that if the requested exemptions were granted, then: 1) for a design-basis accident, an offsite radiological release will not exceed the U.S. Environmental Protection Agencys Protective Action Guides (PAGs) at the exclusion area boundary, as detailed in the Environmental Protection Agency PAG Manual: Protective Action Guides and Planning Guidance for Radiological Incidents, January 2017; and 2) in the unlikely event of a beyond design-basis accident, resulting in a loss of all spent fuel pool cooling, there is sufficient time to initiate appropriate mitigating actions on site and, if a release is projected to occur, there is sufficient time for offsite agencies to take protective actions using a CEMP to protect the public health and safety. The Commission approved the NRC staffs recommendation to grant the exemptions, based on this evaluation in its Staff Requirements Memorandum (SRM) to SECY 0080, dated October 25, 2017.
Based on these analyses, the licensee stated that complete application of the EP rule to Fort Calhoun, in its particular circumstances as a permanently shutdown and defueled reactor, would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule. The licensee also stated that it would incur undue costs in the application of operating plant EP requirements for the maintenance of an emergency response organization in excess of that actually needed 6
to respond to the diminished scope of credible accidents for a permanently shutdown and defueled reactor.
Environmental Impacts of the Proposed Action Based on the conclusions reached in SECY-17-0080, the NRC staff concludes that the exemptions, if granted, would not significantly increase the probability or consequences of accidents at Fort Calhoun in its permanently shutdown and defueled condition. There would be no significant change in the types of any effluents that may be released offsite. There would be no significant increase in the amounts of any effluents that may be released offsite. There would be no significant increase in individual or cumulative occupational or public radiation exposure. Therefore, there are no significant radiological environmental impacts associated with the proposed action.
With regard to potential non-radiological impacts, the proposed action does not have any foreseeable impacts to land, air, or water resources, including impacts to biota.
In addition, there are no known socioeconomic or environmental justice impacts associated with the proposed action. Therefore, there are no significant non-radiological environmental impacts associated with the proposed action.
Accordingly, the NRC concludes that there are no significant environmental impacts associated with the proposed action.
Environmental Impacts of the Alternatives to the Proposed Action As an alternative to the proposed action, the NRC staff considered the denial of the proposed action (i.e., the no-action alternative). The denial of the proposed action would not result in a change to the current environmental impacts. Therefore, the environmental impacts of the proposed action and the alternative action are similar.
7
Alternative Use of Resources The proposed action does not involve the use of any different resources than those considered in the Final Environmental Statement for the Fort Calhoun Station, Unit No. 1 dated August 1972 as supplemented through the Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Fort Calhoun Station Unit 1 - Final Report (NUREG-1437, Supplement 12).
Agencies or Persons Consulted The NRC staff did not enter into consultation with any other Federal agency or with the State of Nebraska regarding the environmental impact of the proposed action.
On October 5, 2017, the Nebraska state representative was notified of this EA and FONSI.
III. Finding of No Significant Impact The licensee has proposed exemptions from: 1) certain requirements in 10 CFR 50.47(b) regarding onsite and offsite emergency response plans for nuclear power reactors; 2) certain requirements in 10 CFR 50.47(c)(2) to establish plume exposure and ingestion pathway emergency planning zones for nuclear power reactors; and 3) certain requirements in 10 CFR part 50, appendix E, section IV, which establishes the elements that make up the content of a licensees emergency plan. The proposed action of granting these exemptions would eliminate the requirements for the licensee to maintain formal offsite radiological emergency plans, as described in 44 CFR part 350, and reduce some of the onsite EP activities at Fort Calhoun, based on the reduced risks at the permanently shutdown and defueled reactor. However, requirements for certain onsite capabilities to communicate and coordinate with offsite response authorities following declaration of an emergency at Fort Calhoun will be retained and offsite all hazards EP provisions will still exist through State and local government use of a CEMP.
8
Consistent with 10 CFR 51.21, the NRC conducted the EA for the proposed action, which is included in Section II of this document, and incorporated by reference in this finding. On the basis of this EA, the NRC concludes that the proposed action will not have a significant effect on the quality of the human environment. Accordingly, the NRC has decided not to prepare an environmental impact statement for the proposed action.
IV. Availability of Documents The documents identified in the following table are available to interested persons through one or more of the following methods, as indicated.
Document ADAMS Accession No. / Web link Developing and Maintaining Emergency http://www.fema.gov/pdf/about/division Operations Plans, Comprehensive s/npd/CPG_101_V2.pdf Preparedness Guide (CPG) 101, Version 2.0, November 2010.
Docket No. 50-285, Request for ADAMS Accession No. ML16356A578 Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E, dated December 16, 2016.
Docket No. 50-285, Supplemental ADAMS Accession No. ML17041A443 Information Needed For Acceptance of Requested Licensing Action RE: Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E, dated February 10, 2017.
Docket No. 50-285, Response to Request ADAMS Accession No. ML17104A191 for Additional Information, Fort Calhoun Station, Unit No. 1 - Final Request for Additional Information Concerning Exemption from the Requirements of 10 CFR 50.47 and Appendix E, dated April 14, 2017.
Docket No. 50-285, Response to Request ADAMS Accession No. ML17111A857 for Additional Information, Fort Calhoun Station, Unit No. 1 - Request for Additional Information RE: Defueled Emergency Plan Exemption Request, dated April 20, 2017.
9
Document ADAMS Accession No. / Web link PAG Manual: Protective Action Guides ADAMS Accession No. ML17044A073 and Planning Guidance for Radiological Incidents, U.S. Environmental Protection Agency, January 2017.
SECY-17-0080, Request by the Omaha ADAMS Accession No. ML17116A430 Public Power District for Exemptions from Certain Emergency Planning Requirements for the Fort Calhoun Station, Unit No. 1, dated August 10, 2017.
Staff Requirements Memorandum to ADAMS Accession No. ML17298A976 SECY-17-0080, dated October 25, 2017.
Staff Requirements Memorandum to ADAMS Accession No. ML081400510 SECY-08-0024, Delegation of Commission Authority to Staff to Approve or Deny Emergency Plan Changes that Represent a Decrease in Effectiveness, dated May 19, 2008.
NUREG-1437, Supplement 12, Generic ADAMS Accession No. ML032110191 Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Fort Calhoun Station Unit 1, August 2003.
Dated at Rockville, Maryland, this 21st day of November, 2017.
For the Nuclear Regulatory Commission.
/RA/
Glenn E. Miller, Acting Chief, Special Projects and Process Branch, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.