Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23151A0046 June 2023Second Set RAIs Rev 4Annual Radiological Effluent Release Report
ML22357A06730 December 2022Enclosure RAI Re Approval of License Termination Plan
ML22119A2473 May 2022Review of Amendment Request to Add a LC to Include LTP Requirements, RAI for Environmental ReviewLicense Renewal
Environmental Justice
ML20111A21620 May 2020Revised PSDAR Request for Additional Information - RAILicense Renewal
Environmental Justice
ML19241A18121 August 2019Request for Additional Information on Proposed Changes to the FCS Emergency Plan and Emergency Action Level Scheme to Reflect an ISFSI-only Status
ML18067A1438 March 2018Enclosurequest for Additional Information (Letter to M. J. Fisher Request for Additional Information Regarding Omaha Public Power District'S Decommissioning Funding Plan Update for Fort Calhoun Station ISFSI)Decommissioning Funding Plan
Authorized possession limits
ML17236A34424 August 2017NRR E-mail Capture - Final RAI for Fort Calhoun Exemption from 10 CFR 140.11(a)(4), Off-site Primary and Secondary Liability Insurance (MF9664)
ML17236A34624 August 2017NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Permanently Defueled TS (MF9567)
ML17234A46922 August 2017NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Removal of Dry Cask Loading Limits (MF9831)
ML17194A97313 July 2017NRR E-mail Capture - Final RAI for Fort Calhoun Ultimate Strength Design for Aux. Bldg LAR (MF8525)
ML17112A03620 April 2017NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Permanently Defueled EP and EAL Scheme Change LARExemption Request
Minimum staff
Fire Protection Program
ML17090A39431 March 2017NRR E-mail Capture - Fort Calhoun - Final RAI Regarding Administrative Control TS Change LAR (MF8437)Fire Protection Program
ML17082A00222 March 2017NRR E-mail Capture - Fort Calhoun Station - Final Nsir/Dpr RAI Regarding Proposed Emergency Planning ExemptionExemption Request
ML17081A01921 March 2017NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Proposed Emergency Planning ExemptionExemption Request
ML17067A38615 March 2017Request for Additional Information, Request for Approval of Certified Fuel Handler Training and Retraining Program to Facilitate Activities Associated with Decommissioning and Irradiated Fuel Handling Management
ML17033A9692 February 2017NRR E-mail Capture - Fort Calhoun Station - Final Request for Additional Information Concerning Post-Shutdown Eplan AmendmentMinimum staff
ML16263A04920 September 2016Request for Additional Information, Request for Approval of Certified Fuel Handler Training and Retraining Program to Facilitate Activities Associated with Decommissioning and Irradiated Fuel Handling Management
ML16174A15027 June 2016Request for Additional Information, Relief Request, Use of Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1
ML16146A17827 May 2016Request for Additional Information, Round 2, Request to Revise Current Licensing Basis as Described in the Final Safety Analysis Report to Allow Equipment Classification Methodology from ANSI/ANS-58.14-2011
ML16106A02329 April 2016Request for Additional Information, Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water ReactorsCoatings
ML16104A28725 April 2016Request for Additional Information, License Amendment Request to Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength RequirementsFinite Element Analysis
ML16048A15423 February 2016Request for Additional Information, License Amendment Request, Revise Current Licensing Basis as Described in the Final Safety Analysis Report to Allow Equipment Classification Methodology from ANSI/ANS-58.14-2011
ML16048A02423 February 2016Request for Additional Information, License Amendment Request to Adopt Technical Specification Task Force (TSTF)-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control
ML15343A10815 December 2015Request for Additional Information, License Amendment Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a DefinitionLocked High Radiation Area
ML15323A03624 November 2015Request for Additional Information, Relief Requests P-1 - LPSI and CS Pumps and P-2 - Adjusting Hydraulic Parameters Consistent W/Code Case OMN-21, Fifth 10-Year Inservice Testing Interval
ML15194A27214 July 2015Request for Additional Information, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive ReactorsOperating Basis Earthquake
ML15057A0153 March 2015Request for Additional Information, Materials Reliability Program (MRP)-227-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines, Implementation ReviewAging Management
ML15043A06125 February 2015Request for Additional Information, Round 2, License Amendment Request to Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section III
ML14353A05122 December 2014Request for Additional Information, Request to Revise Updated Safety Analysis Report, Design and Evaluation of Seismic Class I Structures Using Ascm (Alternate Seismic Criteria and Methodologies) Developed Floor Response Spectra
ML14259A36524 September 2014Request for Additional Information, License Amendment Request to Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section IIIEarthquake
ML14195A08616 July 2014Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Hazard and Screening ReportSafe Shutdown Earthquake
Fukushima Dai-Ichi
ML13317A58325 November 2013Interim Staff Evaluation and Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Safe Shutdown
High Radiation Area
Safe Shutdown Earthquake
Finite Element Analysis
FLEX
Spent Fuel Pool Instrumentation
Fire Protection Program
GOTHIC
ML13304B4181 November 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
ML13282A5369 October 2013Request for Additional Information Email, Round 2, Exemption Request, Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7)Exemption Request
ML13290A0029 October 2013Request for Additional Information Email, License Amendment Request to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks
ML13270A28727 September 2013Email, Request for Additional Information Round 4 (Apla), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition)Hot Short
ML13261A21218 September 2013Request for Additional Information Email, Exemption Request, Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7)Tornado Generated Missile
Exemption Request
ML13233A24826 August 2013Supplemental Information Needed for Acceptance of Requested Licensing Action; Request for Exemption, Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage in Lieu of 10 CFR 26.205(d)(7)Exemption Request
ML13235A16823 August 2013Draft Request for Additional Information Email, Overall Integrated Plan in Response to 3/12/2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)Safe Shutdown
High Radiation Area
FLEX
Spent Fuel Pool Instrumentation
ML13234A43522 August 2013Request for Additional Information Email, Round 2, Request to Revise TS 2.0.1, General Requirements, and TS 2.7, Electrical Systems, for Inoperable System, Subsystem. or Component Due to Inoperable Power SourceBoric Acid
ML13226A12214 August 2013Email, Request for Additional Information Round 3 (Apla), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition)Safe Shutdown
Fire Barrier
Probabilistic Risk Assessment
Continuous fire watch
Fire Protection Program
ML13212A00930 July 2013Request for Additional Information Email, Request to Revise Technical Specification (TS) 2.0.1, General Requirements, and TS 2.7, Electrical Systems, for Inoperable System, Subsystem, or Component Due to Inoperable Power SourceBoric Acid
ML13205A12524 July 2013Request for Additional Information Email Round 2, Exigent Amendment Request to Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile ImpactSafe Shutdown
Tornado Generated Missile
Tornado Missile Protection
ML13205A01823 July 2013Request for Additional Information Email, Exigent License Amendment Request to Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile ImpactTornado Generated Missile
Tornado Missile Protection
ML13144A48223 May 2013Request for Additional Information Email, Decommissioning Funding Status Report
ML13100A17510 April 2013Request for Additional Information Email, Request for One-Time Exemption from Requirements of 10 CFR 26.205(d)(7) to Allow Less Restrictive Working Hour Limitations to Support Activities for Plant StartupExemption Request
ML13086A47327 March 2013Request for Additional Information Email, Request to Revise Technical Specification 2.16, River Level, and Establish EAL Classification Criteria for External Flooding Events Under Radiological Emergency Response Plan
ML13120A08422 March 2013Request for Additional Information Email Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 20 (TAC No. D91660)
ML13053A22622 February 2013Email, Second Round Draft Request for Additional Information, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants.Safe Shutdown
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Coatings
Operator Manual Action
Exemption Request
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
Scaffolding
ML13016A43216 January 2013E-mail, Request for Additional Information, Round 2, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition)Internal Flooding
Probabilistic Risk Assessment
Large early release frequency