ML17087A090: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 5: Line 5:
| author name =  
| author name =  
| author affiliation = Dominion Nuclear Connecticut, Inc
| author affiliation = Dominion Nuclear Connecticut, Inc
| addressee name = Silk D M
| addressee name = Silk D
| addressee affiliation = NRC/RGN-I/DRS/OB
| addressee affiliation = NRC/RGN-I/DRS/OB
| docket = 05000336
| docket = 05000336
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: Maximum RCS Venting Time Determination JPMNumber:
{{#Wiki_filter:JOB PERFORMANCE MEASURE APPROVAL SHEET JPM
JPM-AlR (JPM-146)
 
Revision:
==Title:==
1 Initiated:
Maximum RCS Venting Time Determination JPMNumber:   JPM-AlR (JPM-146)                     Revision:       1 Initiated:
John W. Riley (Signature on File) 1/23117 Developer Date Reviewed:
John W. Riley (Signature on File)                 1/23117 Developer                               Date Reviewed:
Will Chesnutt (Signature on File) 1/27117 Technical Reviewer Date Approved:
Will Chesnutt (Signature on File)                 1/27117 Technical Reviewer                           Date Approved:
Michael John Cote (Signature on File) 1/24/17 Supervisor, Nuclear Training Date 1
Michael John Cote (Signature on File)               1/24/17 Supervisor, Nuclear Training                     Date 1


==SUMMARY==
==SUMMARY==
OF CHANGES DATE DESCRIPTION REV/CHANGE 1/9117 JPM 146 developed in 2001. Revised to latest JPM format. 1 Changed number for 201 7 NRC JPM exam. Changed initial condition to give a different vent time. Other editorial changes. 2 JPM WORKSHEET Facility:
OF CHANGES DATE                           DESCRIPTION                             REV/CHANGE 1/9117   JPM 146 developed in 2001. Revised to latest JPM format.               1 Changed number for 201 7 NRC JPM exam. Changed initial condition to give a different vent time. Other editorial changes.
MP2 Bxaminee:
2
JPMNumber:
 
JPM-AlR (JPM-146)
JPM WORKSHEET Facility:     MP2                           Bxaminee:
Revision:
JPMNumber:               JPM-AlR (JPM-146)                           Revision:       1 Task
1 Task Title: Maximum RCS Venting Time Determination System: RCS Time Critical Task: DYES Validated Time (minutes):
 
10 Task Number(s):
==Title:==
NUTIMS #000-05-222 Applicable To: STA ----RO ---x PBO SRO KIA Number: 2.1.23 KIA Rating: 4.314.4 --------Method of Testing: Simulated Performance:
Maximum RCS Venting Time Determination System:             RCS Time Critical Task:                   DYES       ~NO Validated Time (minutes):               10 Task Number(s):                   NUTIMS #000-05-222 Applicable To:               SRO                  STA
Actual Performance:
                                                          ----             RO
x Location:
                                                                                  -- x-         PBO KIA Number:                 2.1.23             KIA Rating:           4.314.4 Method of Testing:         Simulated Performance:                                   Actual Performance:           x Location:                   Classroom:         x               Simulator:                         In-Plant:
Classroom:
Task Standards:               At the completion of this JPM, the examinee will have determined the maximum allowable venting time (7 minutes+/- 2 minutes). under the stated plant conditions Required Materials:             BOP 2541, Appendix 24 (procedures, equipment, etc.)
x Simulator:
General  
In-Plant:
Task Standards:
At the completion of this JPM, the examinee will have determined the maximum allowable venting time (7 minutes+/- 2 minutes).
under the stated plant conditions Required Materials: (procedures, equipment, etc.) General  


==References:==
==References:==
BOP 2541
                                        *** READ TO THE EXAMINEE ***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
3


BOP 2541, Appendix 24 BOP 2541 *** READ TO THE EXAMINEE *** I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied.
JPM WORKSHEET JPMNumber:           JPM-AlR (JPM-146)                     Revision:         1 Initial Conditions:
With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
3 JPM WORKSHEET JPMNumber:
JPM-AlR (JPM-146)
Revision:
1 Initial Conditions:
Initiating Cues: Simulator Requirements:
* The plant tripped from 100% due to a LOCA.
* The plant tripped from 100% due to a LOCA.
* EOP 2532 is being performed.
* EOP 2532 is being performed.
Line 62: Line 56:
* Containment pressure is 2.2 psig.
* Containment pressure is 2.2 psig.
* Containment hydrogen concentration is currently 2.0%.
* Containment hydrogen concentration is currently 2.0%.
* Containment fans are running. The Unit Supervisor has directed you to determine the maximum allowable RCS venting time in accordance with EOP 2541, Appendix 24, "Void Elimination", Contingency Action Step 4.1.a. NIA ****NOTES TO TASK PERFORMANCE EVALUATOR****
* Containment fans are running.
Initiating Cues:              The Unit Supervisor has directed you to determine the maximum allowable RCS venting time in accordance with EOP 2541, Appendix 24, "Void Elimination", Contingency Action Step 4.1.a.
Simulator Requirements:        NIA
                  ****NOTES TO TASK PERFORMANCE EVALUATOR****
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). 4 PERFORMANCE INFORMATION JPM Number: JPM-AlR (JPM-146)
: 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
Task Title: Maximum RCS Venting Time Determination S TE P I Performance:  
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
#1 4.1 IF attempts to eliminate the void were not successful AND a non-condensable void is suspected, PERFORM the following to vent the reactor vessel: a. DETERMINE maximum allowable venting time. Refer to Attachment 24-A, "RCS Vent Time Based on Hydrogen Buildup Inside Containment." Standard:
4
Examinee refers to Attachment 24-A Revision:
 
1 START TIME: ----Critical:
PERFORMANCE INFORMATION JPM Number:         JPM-AlR (JPM-146)                                             Revision:      1 Task
Grade so uo Cue: Provide a copy ofEOP 2541, Appendix 24. The title on Attachment 24-A does not match the procedure step. The step has "RCS Vent Time Based on Hydrogen Buildup Inside Containment" and Attachment 24-A has "RCS Vent Time Based on Hydrogen Buildup".
 
==Title:==
Maximum RCS Venting Time Determination START TIME: - - - -
S TE P I Performance:                                         Standard:                                          Critical:        Grade
  #1 4.1 IF attempts to eliminate the void were           Examinee refers to Attachment 24-A              YON~              so uo not successful AND a non-condensable void is suspected, PERFORM the following to vent the reactor vessel:
: a. DETERMINE maximum allowable venting time. Refer to Attachment 24-A, "RCS Vent Time Based on Hydrogen Buildup Inside Containment."
Cue: Provide a copy ofEOP 2541, Appendix 24. The title on Attachment 24-A does not match the procedure step. The step has "RCS Vent Time Based on Hydrogen Buildup Inside Containment" and Attachment 24-A has "RCS Vent Time Based on Hydrogen Buildup".
If asked state as a the US state that Attachment 24-A "RCS Vent Time Based on Hydrogen Buildup" should be used and that you will make an entry in the Narrative Log on the discrepancy.
If asked state as a the US state that Attachment 24-A "RCS Vent Time Based on Hydrogen Buildup" should be used and that you will make an entry in the Narrative Log on the discrepancy.
Comments:
Comments:
5 PERFORMANCE INFORMATION JPMNumber:
5
JPM-AlR {J!1M-_146)
 
Revision:
PERFORMANCE INFORMATION JPMNumber:           JPM-AlR {J!1M-_146)                                               Revision:     1 Task
1 Task Title: Maximum RCS Venting Time Determination STEP Performance:
 
Standard:
==Title:==
Critical:
Maximum RCS Venting Time Determination STEP Performance:                                     Standard:                                               Critical:   Grade
Grade #2 This figure is valid only when the following Examinee compares initial conditions against the YD N!Z;J so uo conditions exist: requirements on Attachment 24-A and identifies
#2 This figure is valid only when the following conditions exist:
: 1. RCS temperature is greater than 212 °F. that the figure is valid for the current conditions.
Examinee compares initial conditions against the       YD N!Z;J   so uo requirements on Attachment 24-A and identifies
: 2. RCS pressure is less than 2250 psia. 3. Containment Temperature is less than 225 °F. 4. Containment pressure is greater than 0.0 psig. 5. Containment Hydrogen concentration is less than 2.9%. 6. Containment fans are running. Cue: Comments:
: 1. RCS temperature is greater than 212 °F.       that the figure is valid for the current conditions.
STEP Performance:
: 2. RCS pressure is less than 2250 psia.
Standard:
: 3. Containment Temperature is less than 225 °F.
Critical:
: 4. Containment pressure is greater than 0.0 psig.
Grade #3 Ycgj ND so uo Determine maximum vent time. Examine using the initial conditions of RCS pressure (760 psia) and current containment Hydrogen volume (2.0%) to determine maximum vent time. Examinee determines the maximum allowable vent time is 7 minutes(+/-
: 5. Containment Hydrogen concentration is less than 2.9%.
2 minutes).
: 6. Containment fans are running.
Cue:
Comments:
STEP Performance:                                     Standard:                                               Critical:   Grade
#3 Determine maximum vent time.                     Examine using the initial conditions of RCS Ycgj ND    so uo pressure (760 psia) and current containment Hydrogen volume (2.0%) to determine maximum vent time.
Examinee determines the maximum allowable vent time is 7 minutes(+/- 2 minutes).
Cue: Once the examinee has determined the maximum vent time state this JPM is complete.
Cue: Once the examinee has determined the maximum vent time state this JPM is complete.
Comments:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
TERMINATION CUE: The evaluation for this JPM is concluded.
STOP TIME: ---6 VERIFICATION OF JPM COMPLETION JPMNumber:
STOP TIME: - - -
JPM-AlR (JPM-146)
6
Revision:
 
1 Date Performed:
VERIFICATION OF JPM COMPLETION JPMNumber:                       JPM-AlR (JPM-146)                                   Revision:           1 Date Performed:
Student: For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
Student:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. EVALUATION SECTION: Time Critical Task? D Yes fZI No Validated Time (minutes):
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
I 10 Actual Time to Complete (minutes):
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
I Work Practice Performance:
EVALUATION SECTION:
D SAT D UNSAT Operator Fundamentals:
Time Critical Task?                                 D   Yes   fZI No Validated Time (minutes):               10       Actual Time to Complete (minutes):
D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question #1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:
I                                                                  I Work Practice Performance:                         D   SAT             D   UNSAT Operator Fundamentals:                             D   SAT             D   UNSAT JPM Question Portion Overall [NLO only]:           D   SAT             D   UNSAT               D   N/A Attached Question #1       D   SAT             D   UNSAT Attached Question #2       D   SAT             D UNSAT Overall Result of JPM:                             D   SAT             D   UNSAT Evaluator:
Print I Sign Areas for hnprovement I Comments:
Print I Sign Areas for hnprovement I Comments:
7 JPMNumber:
7
Initial Conditions:
 
Initiating Cues: STUDENT HANDOUT JPM-AlR (JPM-146)
STUDENT HANDOUT JPMNumber:            JPM-AlR (JPM-146)                           Revision:           1 Initial Conditions:
Revision:
1
* The plant tripped from 100% due to a LOCA.
* The plant tripped from 100% due to a LOCA.
* BOP 2532 is being performed.
* BOP 2532 is being performed.
Line 116: Line 122:
* Containment pressure is 2.2 psig.
* Containment pressure is 2.2 psig.
* Containment hydrogen concentration is currently 2.0%.
* Containment hydrogen concentration is currently 2.0%.
* Containment fans are running. The Unit Supervisor has directed you to determine the maximum allowable RCS venting time in accordance with BOP 2541, Appendix 24, "Void Elimination'', Contingency Action Step 4.1.a. 8 JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: Evaluate RCP Seal Problem (Admin) JPM Number: JPM-Al.1 Revision:
* Containment fans are running.
010 Initiated:
Initiating Cues:    The Unit Supervisor has directed you to determine the maximum allowable RCS venting time in accordance with BOP 2541, Appendix 24, "Void Elimination'', Contingency Action Step 4.1.a.
Robert L. Cimmino, Jr. 0113112017 Developer Date Reviewed:
8
Will Chesnutt Technical Reviewer Date Approved:
 
Michael John Cote Supervisor, Nuclear Training Date
JOB PERFORMANCE MEASURE APPROVAL SHEET JPM
 
==Title:==
Evaluate RCP Seal Problem (Admin)
JPM Number: JPM-Al.1                         Revision:     010 Initiated:
Robert L. Cimmino, Jr.                 0113112017 Developer                         Date Reviewed:
Will Chesnutt Technical Reviewer                     Date Approved:
Michael John Cote Supervisor, Nuclear Training               Date


==SUMMARY==
==SUMMARY==
OF CHANGES DATE DESCRIPTION REV/CHANGE 0612712003 Updated to reflect changes to OP 2301 C and new 1500 psid 8 criteria.
OF CHANGES DATE                             DESCRIPTION                       REV/CHANGE Updated to reflect changes to OP 2301 C and new 1500 psid 0612712003                                                                    8 criteria.
05/03/2016 rlc Updated to reflect new format and procedure chanaes. 9 O 1/26/201 7 rlc Concept copied from JPM-011for2017 NRG Re-Take Exam 010 2 JPM WORKSHEET Facility:
05/03/2016 rlc Updated to reflect new format and procedure chanaes.           9 O1/26/201 7 rlc Concept copied from JPM-011for2017 NRG Re-Take Exam           010 2
MP2 Examinee:
 
JPM Number: JPM-Al.l Revision:
JPM WORKSHEET Facility:     MP2                           Examinee:
0/0 Task Title: Evaluate RCP Seal Problem (Admin) System: RCP Time Critical Task: D YES cg] NO Validated Time (minutes):
JPM Number:                     JPM-Al.l                               Revision:     0/0 Task
20 Task Number(s):
 
NUTIMS #003-01-033 Applicable To: SRO STA RO x PEO KIA Number: 003/A2.01 KIA Rating: 3.5/3.9 KIA Number: 2.1.7 KIA Rating: 4.4/4.7 --------Method of Testing: Simulated Performance:
==Title:==
Actual Performance:
Evaluate RCP Seal Problem (Admin)
x Location:
System:             RCP Time Critical Task:                   D   YES     cg] NO Validated Time (minutes):               20 Task Number(s):                   NUTIMS #003-01-033 Applicable To:                 SRO                 STA                       RO     x           PEO KIA Number:               003/A2.01             KIA Rating:           3.5/3.9 KIA Number:                   2.1.7               KIA Rating:
Classroom:
                                                                - - -4.4/4.7 Method of Testing:           Simulated Performance:                                   Actual Performance:           x Location:                   Classroom:         x               Simulator:                         In-Plant:
x Simulator:
Task Standards:                 At the completion of this JPM, examinee has evaluated "A" RCP indications and reported that one seal has failed and another seal is failed/degraded. The examinee also recommends, based on the above findings, that a controlled shutdown should be initiated.
In-Plant:
Required Materials:             AOP 2586, RCP Malfunctions (procedures, equipment, etc.)   Calculator General  
Task Standards:
At the completion of this JPM, examinee has evaluated "A" RCP indications and reported that one seal has failed and another seal is failed/degraded.
The examinee also recommends, based on the above findings, that a controlled shutdown should be initiated.
Required Materials:
AOP 2586, RCP Malfunctions (procedures, equipment, etc.) Calculator General  


==References:==
==References:==
AOP 2586, RCP Malfunctions
                                        *** READ TO THE EXAMINEE ***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
3


AOP 2586, RCP Malfunctions
JPM WORKSHEET JPMNumber:                   JPM-Al.1                         Revision:         0/0 Initial Conditions:
*** READ TO THE EXAMINEE *** I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied.
* Several alarms have annunciated for the "A" RCP.
With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
3 JPM WORKSHEET JPMNumber:
JPM-Al.1 Revision:
0/0 Initial Conditions:
* Several alarms have annunciated for the "A" RCP. Initiating Cues:
* C-02/3; BA-18, RCP A MID SEAL PRES HI, remains locked in.
* C-02/3; BA-18, RCP A MID SEAL PRES HI, remains locked in.
* The PPC has failed and is unusable.
* The PPC has failed and is unusable.
* The US has entered AOP 2586, RCP Malfunctions, and has proceeded to step *2a. Trend RCP Data, CHECK PPC available.
* The US has entered AOP 2586, RCP Malfunctions, and has proceeded to step *2a. Trend RCP Data, CHECK PPC available.
* Another operator has just recorded the initial set of data for the "A" RCP on AOP 2586, Attachment A, A RCP Seal Data.
* Another operator has just recorded the initial set of data for the "A" RCP on AOP 2586, Attachment A, A RCP Seal Data.
Initiating Cues:
* You are the RO.
* You are the RO.
* The US has directed you to perform AOP 2586, RCP Malfunctions, starting with Step *2a. Trend RCP Data, to evaluate the operation of the "A" RCP, using the initial set of data that was recorded.
* The US has directed you to perform AOP 2586, RCP Malfunctions, starting with Step *2a. Trend RCP Data, to evaluate the operation of the "A" RCP, using the initial set of data that was recorded.
Line 159: Line 167:
* RCP vibration data will be acquired and trended by another operator.
* RCP vibration data will be acquired and trended by another operator.
* Only the initial set of data needs to be evaluated at this time. Subsequent trending of RCP data will be performed by other operators.
* Only the initial set of data needs to be evaluated at this time. Subsequent trending of RCP data will be performed by other operators.
Simulator Requirements:
Simulator Requirements:       None
None ****NOTES TO TASK PERFORMANCE EVALUATOR****
                ****NOTES TO TASK PERFORMANCE EVALUATOR****
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). 4 PERFORMANCE INFORMATION JPM Number: JPM-Al.l Revision:
: 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
0/0 Task Title: Evaluate RCP Seal Problem (Admin) START TIME: ___ _ STEP Performance:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Standard:
4
Critical:
 
Grade #1 AOP 2586 2 "RCP Malfunctions" YO N[gj so uo ACTION/EXPECTED RESPONSE Examinee refers to AOP 2586, Step 2 and notes the 2. Trend RCP Data PPC is not available per the initiating conditions.
PERFORMANCE INFORMATION JPM Number:       JPM-Al.l
: a. CHECK PPC available Examinee then refers to RNO Step 2a. l . and uses RESPONSE NOT OBTAINED the given copy of Attachment "A", with the a. PERFORM the following:
_::.__~~~~~~~~~~~~---~~~
provided initial data, to determine the status of the I. Using appropriate ATTACHMENT A "A" RCP seals. through ATTACHMENT D, RECORD the affected RCP data parameters at an interval determined by SM/US AND REFER to ATTACHMENT E. Cue: Comments:
Revision:     0/0 Task
The form is effectively a job aid in determining the status of RCP seals when the PPC is unavailable.
 
STEP Performance:
==Title:==
Standard:
Evaluate RCP Seal Problem (Admin)
Critical:
START TIME: _ _ __
Grade #2 AOP 2586 2 "RCP Malfunctions" Examinee fills out Attachment A in accordance YO N[gj so uo ATTACHMENT A 2 "A RCP Seal Data" with the attached key. Based on the calculations performed on Attachment A: I. One seal Lip < 200 psid. 2. Second seal Lip > 1500 psid. Cue: Comments:
STEP Performance:                                       Standard:                                               Critical:   Grade
5 PERFORMANCE INFORMATION JPM Number: JPM-Al.1 Revision:
#1 AOP 2586 2 "RCP Malfunctions"                                                                               YO   N[gj so uo ACTION/EXPECTED RESPONSE                           Examinee refers to AOP 2586, Step 2 and notes the
0/0 Task Title: Evaluate RCP Seal Problem (Admin) STEP Performance:
: 2. Trend RCP Data                                   PPC is not available per the initiating conditions.
Standard:
: a. CHECK PPC available                         Examinee then refers to RNO Step 2a. l . and uses RESPONSE NOT OBTAINED                               the given copy of Attachment "A", with the
Critical:
: a. PERFORM the following:                       provided initial data, to determine the status of the I. Using appropriate ATTACHMENT A           "A" RCP seals.
Grade #3 AOP 2586 2 "RCP Malfunctions" Examinee refers to AOP 2586, Attachment E,
through ATTACHMENT D, RECORD the affected RCP data parameters at an interval determined by SM/US AND REFER to ATTACHMENT E.
so uo ATTACHMENT E 2 "RCP Seal Failure "RCP Seal Failure Indication Significance", and Indication Significance" notes the following:
Cue:
Comments: The form is effectively a job aid in determining the status of RCP seals when the PPC is unavailable.
STEP Performance:                                       Standard:                                               Critical:   Grade
#2 AOP 25862 "RCP Malfunctions"                       Examinee fills out Attachment A in accordance           YO N[gj     so uo ATTACHMENT A 2 "A RCP Seal Data"                   with the attached key.
Based on the calculations performed on Attachment A:
I. One seal Lip < 200 psid.
: 2. Second seal Lip > 1500 psid.
Cue:
Comments:
5
 
PERFORMANCE INFORMATION JPM Number:         JPM-Al.1
                            ~~~~~~~~~~~~~~~~~~~
Revision:     0/0 Task
 
==Title:==
Evaluate RCP Seal Problem (Admin)
STEP Performance:                                       Standard:                                           Critical: Grade
#3 AOP 25862 "RCP Malfunctions"                       Examinee refers to AOP 2586, Attachment E,         Y~NO      so uo ATTACHMENT E 2 "RCP Seal Failure                   "RCP Seal Failure Indication Significance", and Indication Significance"                             notes the following:
Indication
Indication
* One seal failed (due to the < 200 psid) . RCP Lower, Mid, Upper seal DIP high/low
* One seal failed (due to the ~p < 200 psid) .
RCP Lower, Mid, Upper seal DIP high/low
* Second seal degraded/failing (due to seal
* Second seal degraded/failing (due to seal
* Any seal greater than 1500 psid RCP >1500 psid).
* Any seal greater than 1500 psid RCP                       ~p >1500 psid).
* DIP is less than or equal to 200 psid Possible Causes: Single RCP Seal Failure Cue: Comments:
* DIP is less than or equal to 200 psid Possible Causes:
Identifying which seal is failed or failing and why is not critical.
Single RCP Seal Failure Cue:
STEP 3. Check RCP For Plant Shutdown Required Standard:
Comments: Identifying which seal is failed or failing and why is not critical.
Critical:
STEP 3. Check RCP For Plant Shutdown Required           Standard:                                           Critical: Grade
Grade #4 a. CHECK affected RCP for the Examinee continues with step 3 and notes the so uo following:
#4     a. CHECK affected RCP for the                   Examinee continues with step 3 and notes the       YON~      so uo following:                                 following:
following:
* Any RCP seal stage DIP is
* Any RCP seal stage DIP is
* One seal has > 1500 psid GREATER THAN 1500 psid AND OR
* One seal has > 1500 psid GREATER THAN 1500 psid                     AND OR
* One seal has < 650 psid .
* One seal has < 650 psid .
* RCP has one RCP seal stage failed and another seal stage LESS THAN 650 psid Cue:
* RCP has one RCP seal stage failed and another seal stage LESS THAN 650 psid Cue:
Comments:
Comments:
6 PERFORMANCE INFORMATION JPM Number: JPM-Al.1 Revision:
6
0/0 Task Title: Evaluate RCP Seal Problem (Admin) STEP Performance:
 
Standard:
PERFORMANCE INFORMATION JPM Number:       JPM-Al.1
Critical:
                            ......=:~~~~~~~~~~~~~~~~~~
Grade #5 b. PERFORM the following:
Revision:   0/0 Task
Examinee continues with step 3b. and recommends Y[8J ND so uo I. GO TO OP 2204, Load Changes a plant shutdown be performed.
 
==Title:==
Evaluate RCP Seal Problem (Admin)
STEP Performance:                                       Standard:                                         Critical:   Grade
#5     b. PERFORM the following:                     Examinee continues with step 3b. and recommends   Y[8J ND   so uo I. GO TO OP 2204, Load Changes           a plant shutdown be performed.
AND INITIATE a plant shutdown AND CONTINUE with actions of this procedure beginning with step 3 .c Cue: The only critical action is to recommend a plant shutdown.
AND INITIATE a plant shutdown AND CONTINUE with actions of this procedure beginning with step 3 .c Cue: The only critical action is to recommend a plant shutdown.
Comments:
Comments:
Recommending a course of action for the plant completes the JPM. TERMINATION CUE: The evaluation for this JPM is concluded.
Recommending a course of action for the plant completes the JPM.
STOP TIME: __ _ 7 VERIFICATION OF JPM COMPLETION JPMNumber:
TERMINATION CUE: The evaluation for this JPM is concluded.
JPM-Al.1 Revision:
STOP TIME: _ __
0/0 Date Performed:
7
Student: For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
 
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. EVALUATION SECTION: Time Critical Task? D Yes 12] No Validated Time (minutes):
VERIFICATION OF JPM COMPLETION JPMNumber:                             JPM-Al.1                                       Revision:         0/0 Date Performed:
I 20 Actual Time to Complete (minutes):
Student:
I Work Practice Performance:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
D SAT D UNSAT Operator Fundamentals:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT 12] NIA Attached Question #1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:
EVALUATION SECTION:
Time Critical Task?                                 D   Yes 12] No Validated Time (minutes):               20         Actual Time to Complete (minutes):
I                                                                  I Work Practice Performance:                         D   SAT             D   UNSAT Operator Fundamentals:                             D   SAT             D   UNSAT JPM Question Portion Overall [NLO only]:           D   SAT             D   UNSAT               12] NIA Attached Question #1       D   SAT             D   UNSAT Attached Question #2       D   SAT             D   UNSAT Overall Result of JPM:                             D   SAT             D   UNSAT Evaluator:
Print I Sign Areas for Improvement I Comments:
Print I Sign Areas for Improvement I Comments:
8 JPMNumber:
8
Initial Conditions:
 
Initiating Cues: STUDENT HANDOUT JPM-Al.1 Revision:
STUDENT HANDOUT JPMNumber:                      JPM-Al.1                                 Revision:           0/0 Initial Conditions:
0/0
* Several alarms have annunciated for the "A" RCP.
* Several alarms have annunciated for the "A" RCP.
* C-02/3; BA-18, RCP A MID SEAL PRES HI, remains locked in.
* C-02/3; BA-18, RCP A MID SEAL PRES HI, remains locked in.
Line 224: Line 255:
* The US has entered AOP 2586, RCP Malfunctions, and has proceeded to step *2a. Trend RCP Data, CHECK PPC available.
* The US has entered AOP 2586, RCP Malfunctions, and has proceeded to step *2a. Trend RCP Data, CHECK PPC available.
* Another operator has just recorded the initial set of data for the "A" RCP on AOP 2586, Attachment A, A RCP Seal Data.
* Another operator has just recorded the initial set of data for the "A" RCP on AOP 2586, Attachment A, A RCP Seal Data.
Initiating Cues:
* You are the RO.
* You are the RO.
* The US has directed you to perform AOP 2586, RCP Malfunctions, starting with Step *2a. Trend RCP Data, to evaluate the operation of the "A" RCP, using the initial set of data that was recorded.
* The US has directed you to perform AOP 2586, RCP Malfunctions, starting with Step *2a. Trend RCP Data, to evaluate the operation of the "A" RCP, using the initial set of data that was recorded.
Line 229: Line 261:
* RCP vibration data will be acquired and trended by another operator.
* RCP vibration data will be acquired and trended by another operator.
* Only the initial set of data needs to be evaluated at this time. Subsequent trending of RCP data will be performed by other operators.
* Only the initial set of data needs to be evaluated at this time. Subsequent trending of RCP data will be performed by other operators.
: 1. Status of "A" RCP Seals: 2. Recommended action: 9 DOMINION Millstone Power Station RCP Malfunctions G H Parameter f-* Middle Seal Upper Seal Vapor Seal Upper Oil Reservoir Lower Oil Reservoir
: 1. Status of "A" RCP Seals:
[EXamillee-Handout I TABLE 1 (D -E ___ _ (C -D =G ___ _ (B -C =H ___ _ (A -B ___ _ PPC Point Expected Value PPC Alarm ATTACHMENT A A RCP Seal Data (Page 1 of 1) AOP 2586 Revision 002 Page 12 of 17 NOTE: RCP seals are four stage sealing devices. When operating properly, the first three seal stages reduce pressure by approximately one third (1i3) of the total pressure across the pump seaL NOTE: With RCS at rated pressure (2200 to 2300 psia), alarms actuate when seal stage pressures deviate from nominal values by 150 psig. This indicates a degraded or failing operation of a particular seal stage. NOTE: RCP seal stages are considered failed when dip across stage is less than 200 psid and RCS pressure is at rated pressure (2200 to 2300 psia). NOTE: The increased dip in the remaining intact seal stages is equal to the decrease in dip of the degraded or failed seal stage. For short periods of time. each seal stage is designed to safely function with full RCS pressure dip across the seal stage to allow for plant shutdown.
: 2. Recommended action:
Operation with dip less than 1500 psid across a seal stage is acceptable indefinitely.
9
Data I (Graphic Location Designator)
 
I Todav, Now (C-04R, HS-150*1)
[EXamillee- Handout I DOMINION                                                                                                                                                                                                           AOP 2586 Millstone Power Station                                                                                                                                                                                         Revision 002 RCP Malfunctions                                                                                                                                                                                               Page 12 of 17 ATTACHMENT A A RCP Seal Data (Page 1 of 1)
Temperature
TABLE 1                                 NOTE:  RCP seals are four stage sealing devices. When operating properly, the first three seal stages reduce pressure by approximately one third (1i3) of the total pressure across the pump seaL (D      -E _ _ __                                  NOTE: With RCS at rated pressure (2200 to 2300 psia), alarms actuate when seal stage pressures deviate from G                                                                    nominal values by 150 psig. This indicates a degraded or failing operation of a particular seal stage.
(&deg;F) _1 !..lcL____(_lill!
(C      -D            =G _ _ __                  NOTE: RCP seal stages are considered failed when dip across stage is less than 200 psid and RCS pressure is at H                                                                  rated pressure (2200 to 2300 psia).
Data (Time Acquired)
(B      -C            =H _ _ __                  NOTE: The increased dip in the remaining intact seal stages is equal to the decrease in dip of the degraded or failed seal stage. For short periods of time. each seal stage is designed to safely function with full RCS pressure dip across the seal stage to allow for plant shutdown. Operation with dip less than (A      -B _ _ __
I *-+-----*-*-+-------+-------+*--*-*----+
1500 psid across a seal stage is acceptable indefinitely.
-+------+--------+--------
Data PPC        Expected            PPC              Data      I  (Graphic (Time Acquired)
---+---'-_lJ . -+----+----l (C-04R, HS-150*2)
Parameter      Point        Value            Alarm            Location      Designator) I      Todav, Now                                                                      I (C-04R, HS-150*1) Temperature (&deg;F)
Pressure (psig) 1 (B) 2200 1625# (High) 1290# (Low)
_1              !..lcL____(_lill!          *-+-----*-*-+-------+-------+*--*-*----+
___ 605 -----+---------------+---------+-------
f-*
--+-----------+-------
                                                                                                                                                                            -+------+--------+--------
+---------
                                                                                                                      ---+---'-_lJ          .  -+----                       +---                                                 -l (C-04R, HS-150*2) Pressure (psig)
L156 78 to 84%
Middle Seal                                  1625# (High)          1              (B) 1290# (Low)                                              2200 Upper Seal                                    ~:=;; ~::~;-1--2---1-(c>j                          ___ 605              -----+---------------+---------+-------
to 84%*--125# (High) 20# /Lowl 85% (High) 70% (Low) 85% (High) 77% (low) 3 (C..04R, HS-150-3)
                                                                                                            *--(D)i-----71~--                             --+-----------+-------                               +---------
Level (%) 76 2 82 Additional Data (gpm I psia I psig I psid) Bleedoff Flow 0 9 to 1.3 pgm ------!--------(K) I -1.52 -----J m-------+*--*-----+-------+-
Vapor Seal                                    125# (High)          3 20# /Lowl (C..04R, HS-150-3) Level (%)
------j F150 RCS Pressure RCS (psia) -15 =A (psig) PZRPR 2240 to 2260 psia 2350# (High) C-02/3 (A) 2240 (2225 to 2245 psig) 1900# (Low) PR-100 Coora"'"'""'  
Upper Oil Reservoir        L156      78 to 84%         85% (High) 70% (Low) 76 Lower Oil Reservoir        *u~l-18 to      84%*--      85% (High)             2 77% (low) 82 Additional Data (gpm I psia I psig I psid)
""""". cmoRR --"' f 0 I 0 1 &deg; += 0 1 Vapor Seal d/p (F=O-El_ _iF_L_ _____ _ _____ _ Upper Seal dip (G=C-0 (G) dip (H=B-9._ _ _(_t:f)___
                                                                          ~_:5g:;;,,<~~~::) PR-~~~:R(#9)
______ --------Lower Seal dip (I=A-B) CVALWROP N/A Table 1 (1) G'aptncsNo CSS324 ATTACHMENT A -'A' RCP SEAL DATA CONTINUOUS USE IExaminee Handout!
Bleedoff Flow      F150    0 9 to 1.3 pgm
!ANSWER KJfY] DOMINION Millstone Power Station RCP Malfunctions G H (D 70 (C Ml5 (B .!200 (A 2240 TABLE 1 -E 0 -D 70 ----C 605 -B 2200 \ I =F __l_ H l I =G ='--"=' =H l:'.'"'I='
        ------                                     !--------                                                     (K)       I -1.52     -----J m-------+*--*-----+-------+-                                         ------j f
' I AOP 2586 Revision 002 Page 12 of 17 ATTACHMENT A A RCP Seal Data (Page 1 of 1) d/p Too High For Continued Operation I NOTE: I NOTE: INOTE: I NOTE: RCP seals are four stage sealing devices. When operating properly, the first three seal stages reduce pressure by approximately one third (1i3) of the total pressure across the pump seal. With RCS at rated pressure (2200 to 2300 psia), alarms actuate when seal stage pressures deviate from nominal values by 150 psig. This indicates a degraded or failing operation of a particular seal stage. RCP seal stages are considered failed when dip across stage is less than 200 psid and RCS pressure is at rated pressure (2200 to 2300 psia). The increased dip in the remaining intact seal stages is equal to the decrease in d/p of the degraded or failed seal stage. For short periods of time. each seal stage is designed to safely function with full RCS pressure dip across the seal stage to allow for plant shutdown.
RCS Pressure       PZRPR   2240 to 2260 psia   2350# (High)         C-02/3             (A) 2240 RCS (psia) - 15 =A (psig)
Operation with dip less than 1500 psid across a seal stage is acceptable indefinitely.
Coora"'"'""'
Data Data (Graphic (Time
Vapor    Seal d/p """"".
__ _ Location Designator)
(F=O-El_
I Today, Now 1-----------_:_::__.:.:._:_::__L_
Upper Seal dip (G=C-0 L.J:Ai_c:J~"1..&sect;eal dip (H=B-9._
_ _,__,_ __ _L ______ _l ______
cmoRR (2225 to 2245 psig)   1900# (Low)        PR-100
Parameter PPC Point Expected Value PPC Alarm _go_:_i=__--+----"-----+----'---'
                                                                                                              --"'_iF_L_
-+ Lower T151 Lube Oil Cooler Outlet T152 100 to 120"F 120"F 2 Lube Oil Cooler Inlet __
(G)
120 to 140"F 1.25 Controlled Bleedoff T154 110 to 150<'F 150&deg;F 115 Motor Stator Windin T155 1'75 --------Upper Gui9e Bearing T156 ISO 105 Lower Guide Bearin T157 140 to 160"'F _____ !&sect;O"F_--+--_--.....:..
__(_t:f)___
_____ +---
0 I    "--r-~-~
Thrust Bearin
0 1          &deg;      +=
__ _ 160&deg;F Thrust Bearing __
0
160"F Anti-reverse Bearing T190 175"'F , .... 8 I -----==P;-:,:;
______          1 Lower Seal dip (I=A-B)         CVALWROP                             N/A           Table 1             (1)
9 rn ------Lower Bearing Oil -,:194--100 to 125"F 125"F ------+---*
G'aptncsNo CSS324 ATTACHMENT A - 'A' RCP SEAL DATA CONTINUOUS USE IExaminee Handout!
11 I '>.\ Middle Seal P151 I 1400 to 1600 psig I 1625# (High) !------------
 
Upper Seal I P152 VaporSeal I P153 Upp8r Oil Reservoir L156 1290# (Low) 600-to 800 psig-40 to 1 OU psig 94-5#(High) 545# (Low)_ -----r---c125# (High) 20#(Low 78 to 84% 85% (High) (C-04R, HS-150-2)
                                                                                                              !ANSWER KJfY]
Pressure (psig) 1 (B) 2 (C) 3 (D) 2200 605 70 (C-04R, HS-150-3)
DOMINION                                                                                                                                                                                                                                   AOP 2586 Millstone Power Station                                                                                                                                                                                                               Revision 002 RCP Malfunctions                                                                                                                                                                                                                     Page 12 of 17 ATTACHMENT A A RCP Seal Data (Page 1 of 1) d/p Too High For Continued Operation TABLE 1         \                  I           I NOTE: RCP seals are four stage sealing devices. When operating properly, the first three seal stages reduce pressure by approximately one third (1i3) of the total pressure across the pump seal.
Level(%) 76 -------+-------+
70      -E      0      =F __l_      H                  I NOTE:
Lower Oil Reservoir I L 157 78 to 84% _"7()%
(D                                                  l  I                     With RCS at rated pressure (2200 to 2300 psia), alarms actuate when seal stage pressures deviate from G                                                                                          nominal values by 150 psig. This indicates a degraded or failing operation of a particular seal stage.
-----------+--85% (High)
(C Ml5      -D 70      =G      ='--"='                  INOTE: RCP seal stages are considered failed when dip across stage is less than 200 psid and RCS pressure is at H                                                                                          rated pressure (2200 to 2300 psia).
Bleedoff Flow RCS Pressure RCS (ps1a) -15 (psig) F150 PZRPR Containment Pressure CTMTPR -yap;;rs-;,aid1p (F=D-E) -CVAVAPDP Upper Seal dip CVAUPRDP _r-,.1iddle Seal dip (H=B-C) CVAMIDDP Lower Seal dip (I=A-B) CVALWRDP CONTINUOUS USE 0.9 to 1 .3 pgm 2240 to 2260 psia (2225 to 2245 psig) 77&deg;/c, (Low) 82 Additional Data (gpm I psia I psig I psid) 1.5 gpm (High) 0.85 gpm (Low) 2350# (High) 1900# (Low)
(B    .!200      -C    605      =H    l:'.'"'I='                I NOTE: The increased dip in the remaining intact seal stages is equal to the decrease in d/p of the degraded
I _ (K) __ L_1_*5_2 ___ _,_ ------1-----------------+----
                                                                                                            '  I or failed seal stage. For short periods of time. each seal stage is designed to safely function with (A    2240              2200                                                  full RCS pressure dip across the seal stage to allow for plant shutdown. Operation with dip less than
-----l-----
                                                                        -B 1500 psid across a seal stage is acceptable indefinitely.
C-0213 1 (A) PR-100 2240 0 0 -*Degraded Seal Failed Seal !ANSWER KEY I 0 G'apt11csNo CS8324 DOMINION Millstone Power Station RCP Malfunctions
Data PPC                Expected              PPC                    Data             (Graphic                                                   (Time Acq~~~-~)__ _
!ANSWER KEYj ATTACHMENT E RCP Seal Failure Indication Significance (Page 1 of 1) Indication Possible Causes: RCP Lower, Mid, Upper seal DIP high/low
Parameter          Point                Value              Alarm                Location         Designator) I         Today, Now 1-----------_:_::__.:.:._:_::__L__ _,__,__ __L_ _ _ _ _ __ l_ _ _ _ _ _-'--.(~C'-04,..~R',cHus'--;f;15o-1)Temperature(&deg;F)
* Any seal greater than 1500 psid I Single RCP Seal Failure
Lower Se~!          T151          ---~-c;u.~~~            _go_:_i=__--+----"-----+----'---'-                      +
* DIP is less than or equal to 200 psid RCP Lower, Mid, Upper seal DIP rate of change Single RCP Seal Failure
Lube Oil Cooler Outlet           T152             100 to 120"F             120"F                   2 Lube Oil Cooler Inlet       _ _I.:!._~1.__       120 to 140"F -+--~--                                                                1.25 Controlled Bleedoff         T154             110 to 150<'F             150&deg;F                                                             115 Motor Stator Windin             T155                                                                                                   1'75 Upper Gui9e Bearing             T156                                                                                                           ISO Lower Guide Bearin               T157             140 to 160"'F     _____!&sect;O"F_--+--_--.....:.._____ +---                             105
            --~r Thrust Bearin
          ~r              Thrust Bearing Anti-reverse Bearing
        - - - - - - Lower Bearing Oil
                                              ---~T158
_ _I_~~
T190
                                                    -,:194--
100 to 125"F
_    160&deg;F 160"F 175"'F 125"F 8
9 rn
                                                                                                                        , ....      I    -----==P;-:,:;
                                                                                                                                      - - - - - - + - I- -'>.\
11 (C-04R, HS-150-2) Pressure (psig)
Middle Seal           P151         I 1400 to 1600 psig   I   1625# (High)                 1                (B) 1290# (Low)                                                          2200
        !------------ Upper Seal             I     P152           600-to 800 psig-         94-5#(High)                2                  (C) 545# (Low)_
605
                                                                                                                                                                          -------+-------+
VaporSeal    I      P153            40 to-----r---c125#
1 OU psig                 (High)             3                 (D) 70 20#(Low (C-04R, HS-150-3) Level(%)
Upp8r Oil Reservoir          L156              78 to 84%            85% (High) 76
_"7()% (L_"::'_'~- ------          -----+--             -+-~---+--                                                                        t-~------j Lower Oil Reservoir   I     L 157             78 to 84%           85% (High) 82 77&deg;/c, (Low)
Additional Data (gpm I psia I psig I psid)
Bleedoff Flow          F150                                  1.5 gpm (High)
PR-~~~:R(#9]
0.9 to 1 .3 pgm RCS Pressure            PZRPR          2240 to 2260 psia 0.85 gpm (Low) 2350# (High)              C-0213      1I _    (K)_ _
(A)
L_1_*5_2____,_              ------1-----------------+---- -----l-----
RCS (ps1a) - 15      ~A (psig)                        (2225 to 2245 psig)                               PR-100 2240 1900# (Low)
Containment Pressure            CTMTPR                                                                                                                    0              0                                                   0
          -yap;;rs-;,aid1p (F=D-E)          -CVAVAPDP Upper Seal dip (G~C-D)              CVAUPRDP                                                                                                                -*Degraded Seal
_r-,.1iddle Seal dip (H=B-C)         CVAMIDDP Lower Seal dip (I=A-B)            CVALWRDP                                                                                                                Failed Seal                                                      G'apt11csNo CS8324 CONTINUOUS USE
                                                                                                              !ANSWER KEY I
 
DOMINION
                                              !ANSWER KEYj                                              AOP2586 Millstone Power Station                                                                                Revision 002 RCP Malfunctions                                                                                      Page 16 of 17 ATTACHMENT E RCP Seal Failure Indication Significance (Page 1 of 1)
Indication                                  Possible Causes:
RCP Lower, Mid, Upper seal DIP high/low
* Any seal greater than 1500 psid                              Single RCP Seal Failure
* DIP is less than or equal to 200 psid RCP Lower, Mid, Upper seal DIP rate of change I
Single RCP Seal Failure
* 10 psidlhr RCP Bleedoff Temperature High Single RCP Seal Failure
* 10 psidlhr RCP Bleedoff Temperature High Single RCP Seal Failure
* Bleedoff temperature greater than 195.0 &deg;F RCP Bleedoff Flow High Single RCP Seal Failure
* Bleedoff temperature greater than 195.0 &deg;F RCP Bleedoff Flow High Single RCP Seal Failure
Line 283: Line 355:
* Increasing Containment Sump level of equal to or greater than 1 gpm
* Increasing Containment Sump level of equal to or greater than 1 gpm
* less than 25 psid
* less than 25 psid
* Controlled Bleedoff pressure (P215) is low and AOP2586 Revision 002 Page 16 of 17 NOT able to be increased using PIC-215. Failed or Failing Vapor Seal Stage
* Controlled Bleedoff pressure (P215) is low and NOT able to be increased using PIC-215.                 Failed or Failing Vapor Seal Stage
* Stator temperature on the affected RCP is increasing and DOES NOT stabilize.
* Stator temperature on the affected RCP is increasing and DOES NOT stabilize.
* Increased upward trend Containment radiation monitors.
* Increased upward trend Containment radiation monitors.
Vapor Seal Pressure High Interruption of RCP Bleedoff Flow Path
Vapor Seal Pressure High Interruption of RCP Bleedoff Flow Path
* greater than 115 psid ,...... -d Operation with DIP less than or equal to 1500 ps1d across a seal stage is acceptable indefinitely.
* greater than 115 psid d Operation with DIP less than or equal to 1500 ps1d across a seal stage is acceptable indefinitely.
II ,____.._ -RCP seal stages are considered failed when DIP across that stage is less than or equal to 200 psld AND RCS pressure is between 2,200 and 2,300 psia IF one seal stage fails (DIP is less than or equal to 200 psid), OR is degrading AND the following are NOT in alarm or trending toward alarm limits, THEN allow affected RCP to remain in service:
                                                                                                              -II RCP seal stages are considered failed when DIP across that stage is less than or equal to 200 psld AND RCS pressure is between 2,200 and 2,300 psia IF one seal stage fails (DIP is less than or equal to 200 psid), OR is degrading AND the following are NOT in alarm or trending toward alarm limits, THEN allow affected RCP to remain in service:
* Controlled Bleedoff Flow
* Controlled Bleedoff Flow
* Controlled Bleedoff Temperature With RCS pressure at 2200 to 2300 psla, alarms are actuated when seal stage pressures deviate from nominal values by 150 psig, Indicating degraded or failing operation of a particular seal stage. !ANSWER KEYi CONTINUOUS USE DOMINION Millstone Power Station RCP Malfunctions  
* Controlled Bleedoff Temperature With RCS pressure at 2200 to 2300 psla, alarms are actuated when seal stage pressures deviate from nominal values by 150 psig, Indicating degraded or failing operation of a particular seal stage.
!ANSWER KEYi STEPll ACTION/EXPECTED RESPONSE II *3_ Check RCP For Plant Shutdown Required AOP2586 Revision 002 Page 7of17 RESPONSE NOT OBTAINED a. CHECK affected RCP for the following:
                                                !ANSWER KEYi CONTINUOUS USE
D a. PROCEED TO step 4. D
 
DOMINION                                 !ANSWER KEYi                                AOP2586 Millstone Power Station                                                           Revision 002 RCP Malfunctions                                                                   Page 7of17 STEPll         ACTION/EXPECTED RESPONSE                 II     RESPONSE NOT OBTAINED
*3_       Check RCP For Plant Shutdown Required
: a. CHECK affected RCP for the following:         D a. PROCEED TO step 4.
D
* Any RCP seal stage D/P is GREATER THAN 1500 psid QB D
* Any RCP seal stage D/P is GREATER THAN 1500 psid QB D
* RCP has one RCP seal stage failed and another seal stage LESS THAN 650 psid QB D
* RCP has one RCP seal stage failed and another seal stage LESS THAN 650 psid QB D
* RCP upper or lower oil reservoir level trending outside of PPG alarm values on Attachment A through Attachment D. QB D
* RCP upper or lower oil reservoir level trending outside of PPG alarm values on Attachment A through Attachment D.
* Any RCP seal temperature or bearing oil temperature increasing trend and evaluation indicates alarm setpoint will be reached b. PERFORM the following:
QB D
D 1. GO TO OP 2204, Load Changes AND INITIATE a plant shutdown AND CONTINUE with actions of this procedure beginning with step 3.c D c. WHEN Reactor is sub-critical, THEN STOP affected RCP CONTINUOUS USE !ANSWER KEYi JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: Determine Shutdown Margin JPMNumber:
* Any RCP seal temperature or bearing oil temperature increasing trend and evaluation indicates alarm setpoint will be reached
JPM-A1.2R Revision:
: b. PERFORM the following:
3 Initiated:
D       1. GO TO OP 2204, Load Changes AND INITIATE a plant shutdown AND CONTINUE with actions of this procedure beginning with step 3.c D   c. WHEN Reactor is sub-critical, THEN STOP affected RCP CONTINUOUS USE
John W. Riley (Signature on File) 01/23/2017 Developer Date Reviewed:
                                        !ANSWER KEYi
Will Chesnutt (Signature on File) 01/31/2017 Technical Reviewer Date Approved:
 
Michael John Cote (Signature on File) 01/24/2017 Supervisor, Nuclear Training Date 1
JOB PERFORMANCE MEASURE APPROVAL SHEET JPM
 
==Title:==
Determine Shutdown Margin JPMNumber:     JPM-A1.2R                       Revision:     3 Initiated:
John W. Riley (Signature on File)         01/23/2017 Developer                         Date Reviewed:
Will Chesnutt (Signature on File)         01/31/2017 Technical Reviewer                     Date Approved:
Michael John Cote (Signature on File)       01/24/2017 Supervisor, Nuclear Training               Date 1


==SUMMARY==
==SUMMARY==
OF CHANGES DATE DESCRIPTION REV/CHANGE Revised JPM for LOIT 2008 NRC Exam 1 Revised to incorporate NRC comments 2 (Note: Rev. 1 was never approved) 12/29/08 Incorporated NRC Post-Validation comments 2 01/23/17 Revised JPM for ILT 2017 JPM Retake Exam. Updated to 3 latest JPM template.
OF CHANGES DATE                           DESCRIPTION                           REV/CHANGE Revised JPM for LOIT 2008 NRC Exam                               1 Revised to incorporate NRC comments                               2 (Note: Rev. 1 was never approved) 12/29/08 Incorporated NRC Post-Validation comments                         2 01/23/17 Revised JPM for ILT 2017 JPM Retake Exam. Updated to             3 latest JPM template. This is essentially a complete re-write of JPM due to the significant changes to the procedure OP 2208 (revision 017) for determining Shutdown Margin and a completely new OP 2208-013 form (revision 009).
This is essentially a complete re-write of JPM due to the significant changes to the procedure OP 2208 (revision 017) for determining Shutdown Margin and a completely new OP 2208-013 form (revision 009). 2 JPM WORKSHEET Facility:
2
MP2 Examinee:
 
JPMNumber:
JPM WORKSHEET Facility:     MP2                           Examinee:
JPM-A1.2R Revision:
JPMNumber:                     JPM-A1.2R                             Revision:       3 Task
3 Task Title: Determine Shutdown Margin System: Administrative Time Critical Task: D YES Validated Time (minutes):
 
25 Task Number(s):
==Title:==
NUTIMS #121-01-145 Applicable To: SRO x STA x RO x PEO KIA Number: 2.1.37 KIA Rating: 4.3/4.6 Method of Testing: Simulated Performance:
Determine Shutdown Margin System:             Administrative Time Critical Task:                   D   YES     ~NO Validated Time (minutes):               25 Task Number(s):                   NUTIMS #121-01-145 Applicable To:                 SRO     x         STA       x             RO     x           PEO KIA Number:                 2.1.37             KIA Rating:           4.3/4.6 Method of Testing:         Simulated Performance:                                   Actual Performance:           x Location:                   Classroom:         x               Simulator:                         In-Plant:
Actual Performance:
Task Standards:                 At the completion of this JPM, the examinee has determined the required shutdown boron concentration is between 833.8 ppm to 850.4 ppm and that required SOM is not being met, taking into account xenon worth.
x Location:
Required Materials:
Classroom:
* OP 2208 and form 2208-13 (procedures, equipment, etc.)
x Simulator:
* RE Curve and Data Book (Cycle 24)
In-Plant:
* Calculator General  
Task Standards:
At the completion of this JPM, the examinee has determined the required shutdown boron concentration is between 833.8 ppm to 850.4 ppm and that required SOM is not being met, taking into account xenon worth. Required Materials: (procedures, equipment, etc.) General  


==References:==
==References:==
* OP 2208 and form 2208-13
OP 2208, Section 4.3
* RE Curve and Data Book (Cycle 24)
                                        *** READ TO THE EXAMINEE ***
* Calculator OP 2208, Section 4.3 *** READ TO THE EXAMINEE *** I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
3
3 JPM WORKSHEET JPMNumber:
 
JPM-A1.2R Revision:
JPM WORKSHEET JPMNumber:                 JPM-A1.2R                       Revision:         3 Initial Conditions:
3 Initial Conditions:
* The plant tripped from 100% steady-state equilibrium power at 1330, after 2 months of operation.
* The plant tripped from 100% steady-state equilibrium power at Initiating Cues: 1330, after 2 months of operation.
* On the trip, CEA #1 (Group 7 CEA) stuck fully withdrawn.
* On the trip, CEA #1 (Group 7 CEA) stuck fully withdrawn.
* All other plant components and systems responded as designed.
* All other plant components and systems responded as designed.
Line 335: Line 414:
* The Chemistry Department sampled the RCS, 15 minutes after the plant trip, and determined the Boron concentration is 650 ppm.
* The Chemistry Department sampled the RCS, 15 minutes after the plant trip, and determined the Boron concentration is 650 ppm.
* Reactor Engineering has indicated core average burnup is 8000 MWD/MTU.
* Reactor Engineering has indicated core average burnup is 8000 MWD/MTU.
Initiating Cues:
* The Unit Supervisor has directed you to verify adequate SDM for the first full hour immediately following a plant trip. Utilize OP 2208 "Reactivity Calculations" section 4.3, crediting Xenon Worth hourly and existing plant conditions.
* The Unit Supervisor has directed you to verify adequate SDM for the first full hour immediately following a plant trip. Utilize OP 2208 "Reactivity Calculations" section 4.3, crediting Xenon Worth hourly and existing plant conditions.
* Report status of Shutdown Margin to the Unit Supervisor after your calculations crediting xenon hourly worth.
* Report status of Shutdown Margin to the Unit Supervisor after your calculations crediting xenon hourly worth.
* An STA review of your results is NOT required.
* An STA review of your results is NOT required.
Simulator Requirements:
Simulator Requirements:       N/A
N/A * * * *NOTES TO TASK PERFORMANCE EVALUATOR* * *
                  * * * *NOTES TO TASK PERFORMANCE EVALUATOR* * * *
* 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). 4 PERFORMANCE INFORMATION JPMNumber:
: 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
JPM-A1.2R Revision:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
3 Task Title: Determine Shutdown Margin START TIME: ----STEP Performance:
4
Standard:
 
Critical:
PERFORMANCE INFORMATION JPMNumber:       JPM-A1.2R                                                   Revision:       3
Grade #1 OP-2208, Section 4.3 CAUTION: Examinee reads and acknowledges the YD N[g] so uo RCS boron concentration must meet CAUTION. SHUTDOWN MARGIN requirements of Technical Specifications LCO: 3.1.1.1, when in MODE 3, 4, and 5. Cue: Provide examinee with the following items:
                          ~-----------------~
Task
 
==Title:==
Determine Shutdown Margin START TIME: - - - -
STEP Performance:                                   Standard:                                         Critical:   Grade
#1 OP-2208, Section 4.3 CAUTION:                   Examinee reads and acknowledges the               YD   N[g] so uo RCS boron concentration must meet             CAUTION.
SHUTDOWN MARGIN requirements of Technical Specifications LCO:
3.1.1.1, when in MODE 3, 4, and 5.
Cue:
Provide examinee with the following items:
* OP 2208, Reactivity Calculations
* OP 2208, Reactivity Calculations
* Blank copy of OPS Form 2208-13, SOM Determination in MODES 3, 4, and 5
* Blank copy of OPS Form 2208-13, SOM Determination in MODES 3, 4, and 5
Line 353: Line 443:
* Calculator
* Calculator
* Ruler Comments:
* Ruler Comments:
STEP Performance:
STEP Performance:                                   Standard:                                         Critical:   Grade
Standard:
#2 4.3.1 REQUEST Chemistry Department             Examinee notes from the Initial Conditions that   YD   N[g] so uo sample and determine present RCS         Chemistry Department has already sampled boron concentration.                     the RCS and provided an RCS boron concentration of 650 ppm.
Critical:
Cue:
Grade #2 4.3.1 REQUEST Chemistry Department Examinee notes from the Initial Conditions that YD N[g] so uo sample and determine present RCS Chemistry Department has already sampled boron concentration.
Comments:
the RCS and provided an RCS boron concentration of 650 ppm. Cue: Comments:
5
5 PERFORMANCE INFORMATION JPMNurnber:
 
JPM-A1.2R Revision:
PERFORMANCE INFORMATION JPMNurnber:       JPM-A1.2R                                               Revision:   3 Task
3 ------------------
 
Task Title: Determine Shutdown Margin STEP Performance:
==Title:==
Standard:
Determine Shutdown Margin STEP Performance:                                   Standard:                                     Critical: Grade
Critical:
#3 NOTE                                                                                       YD   N[Z] so uo
Grade #3 NOTE YD N[Z] so uo 1. All data is recorded and calculated on OP Examinee reads and acknowledges the 2208-013, "SOM Determination in MODEs NOTE. 3, 4 and 5." Additional forms may be used as necessary.
: 1. All data is recorded and calculated on OP   Examinee reads and acknowledges the 2208-013, "SOM Determination in MODEs       NOTE.
3, 4 and 5." Additional forms may be used as necessary.
: 2. SOM Determination may be performed to evaluate anticipated future plant conditions (e.g., due to plant cooldown, plant heatup or Shutdown CEA Groups withdrawn).
: 2. SOM Determination may be performed to evaluate anticipated future plant conditions (e.g., due to plant cooldown, plant heatup or Shutdown CEA Groups withdrawn).
Cue: Comments:
Cue:
STEP Performance:
Comments:
Standard:
STEP Performance:                                   Standard:                                     Critical: Grade
Critical:
#4 4.3.2 RECORD Date and Time of                 Examinee records a date and time on OP       YD   N[Z] so uo calculation.                           2208-013.
Grade #4 4.3.2 RECORD Date and Time of Examinee records a date and time on OP YD N[Z] so uo calculation.
Cue:
2208-013.
Comments:
Cue: Comments:
STEP Performance:                                   Standard:                                     Critical: Grade
STEP Performance:
#5 4.3.3 OBTAIN present Core Burnup from         Examinee obtains present core burnup from   YD   N[Z] so uo one of the following and RECORD:       Initial Conditions (8000 MWD/MTU), as
Standard:
            * "CVBURNUP" (PPC)                     provided by Reactor Engineering, and records
Critical:
* Reactor EnQineerinQ                   it on OP 2208-013.
Grade #5 4.3.3 OBTAIN present Core Burnup from Examinee obtains present core burnup from YD N[Z] so uo one of the following and RECORD: Initial Conditions (8000 MWD/MTU), as * "CVBURNUP" (PPC) provided by Reactor Engineering, and records
Cue:
* Reactor EnQineerinQ it on OP 2208-013.
Comments:
Cue: Comments:
* Obtained from initial conditions .
* Obtained from initial conditions . 6 PERFORMANCE INFORMATION JPM Number: JPM-A 1.2R Revision:
6
3 Task Title: Determine Shutdown Margin STEP Performance:
 
Standard:
PERFORMANCE INFORMATION JPM Number:       JPM-A 1.2R                                               Revision:   3 Task
Critical:
 
Grade #6 4.3.4 RECORD RCS temperature (TAVG) Examines notes from the Initial Conditions that Y0N[gj so uo for the present OR anticipated plant the RCS TAVG is 532&deg;F and records 532&deg;F on condition.
==Title:==
OP 2208-013.
Determine Shutdown Margin STEP Performance:                                 Standard:                                       Critical: Grade
Cue: Comments:
#6 4.3.4 RECORD RCS temperature (TAVG)         Examines notes from the Initial Conditions that Y0N[gj     so uo for the present OR anticipated plant   the RCS TAVG is 532&deg;F and records 532&deg;F on condition.                             OP 2208-013.
STEP Performance:
Cue:
Standard:
Comments:
Critical:
STEP Performance:                                 Standard:                                       Critical: Grade
Grade #7 4.3.5 CIRCLE the status of the Shutdown Examines notes from initial conditions that all Y0N[gj so uo CEA Groups position (Shutdown CEA CEAs are inserted except for CEA #1 which is Groups may be withdrawn only in not a Shutdown CEA. Examines circles MODE 3) for the present OR inserted on 2208-13. anticipated plant condition.
#7 4.3.5 CIRCLE the status of the Shutdown     Examines notes from initial conditions that all Y0N[gj     so uo CEA Groups position (Shutdown CEA     CEAs are inserted except for CEA #1 which is Groups may be withdrawn only in       not a Shutdown CEA. Examines circles MODE 3) for the present OR             inserted on 2208-13.
Cue: Comments:
anticipated plant condition.
STEP Performance:
Cue:
Standard:
Comments:
Critical:
STEP Performance:                                 Standard:                                       Critical: Grade
Grade #8 NOTE Y0N[gj so uo 1. Interpolation may be required to Examines reads and acknowledges the determine required xenon free shutdown NOTE. boron concentration value. 2. RE Curve and Data Book Curve RE-B-03, "Minimum Boron Concentration, No Xenon, Keff = 0.99, Shutdown CEAs -Withdrawn, HZP," can only be used in MODE 3 with RCS average temperature (TAVG) Qreater than or equal to 500&deg;F. Cue: Comments:
#8 NOTE                                                                                         Y0N[gj     so uo
7 PERFORMANCE INFORMATION JPM Number: JPM-A1 .2R Revision:
: 1. Interpolation may be required to         Examines reads and acknowledges the determine required xenon free shutdown     NOTE.
3 Task Title: Determine Shutdown Margin STEP Performance:
boron concentration value.
Standard:
: 2. RE Curve and Data Book Curve RE-B-03, "Minimum Boron Concentration, No
Critical:
                      =
Grade #9 4.3.6 Refer To RE Curve and Data Book and Examinee uses 8000 MWD/MTU as burnup so uo DETERMINE the Required Xenon Free value and a Tavg of 532 &deg;F and determines Shutdown Boron Concentration as required shutdown boron concentration from follows: the RE Curve and Data Book (RE-B-01) is a. IF Shutdown CEA Groups are 786 ppm (Tolerance:
Xenon, Keff 0.99, Shutdown CEAs -
780 ppm to 790 ppm] inserted, Refer To RE Curve RE-B-01, "3.6% Shutdown Boron Note tabular RE-B-01 provides 786 ppm for Concentration vs. Moderator 8000 MWD/MTU. Temperature," and DETERMINE the required xenon free shutdown boron concentration as a function of RCS Examinee records required xenon free so uo temperature (TAVG) and core shutdown boron concentration value of 786 burn up. ppm (780 ppm to 790 ppm) on OP 2208-013" b. IF Shutdown CEA Groups are in "Required Xe Free CB." withdrawn OR are anticipated to be withdrawn, Refer To RE Curve RE-B-03, "Minimum Boron Concentration, No Xenon, Keff = 0.99, Shutdown CEAs -Withdrawn, HZP," and DETERMINE the required xenon free shutdown boron concentration as a function of core burnup. c. RECORD required xenon free shutdown boron concentration value in "Reauired Xe Free CB." Cue: Comments:
Withdrawn, HZP," can only be used in MODE 3 with RCS average temperature (TAVG) Qreater than or equal to 500&deg;F.
8 PERFORMANCE INFORMATION JPM Number: JPM-A1 .2R Revision:
Cue:
3 Task Title: Determine Shutdown Margin STEP Performance:
Comments:
Standard:
7
Critical:
 
Grade #10 NOTE: Examinee reads and acknowledges the Y0Ni:g] so uo FSAR Chapter 14 main steam line break NOTE. analysis uses the additional 350 ppm boration to disposition a main steam line break event initiated in MODE 3 with SIAS blocked. With SIAS blocked, the accident analysis does not credit boration from the HPSI pumps. Cue: Comments:
PERFORMANCE INFORMATION JPM Number:       JPM-A1 .2R
STEP Performance:
__:..;:___;___;~...:_~~~~~~~~~~~~~
Standard:
Revision:  3 Task
Critical:
 
Grade #11 4.3.7 DETERMINE the "Stuck Rod Boron Examinee from initial conditions identifies that Y0N0 so uo Equivalent" as follows: [Ref. 6.5] one regulating CEA did not insert into the core a. RECORD the number of untrippable when the unit was tripped. CEAs not inserted.
==Title:==
Examinee records one CEA not inserted, b. MULTIPLY the value recorded in multiplies one times 350 ppm and records step 4.3. 7.a. by 350 ppm. "Stuck Rod Boron Equivalent" as 350 ppm. c. RECORD result in "Stuck Rod Boron Equivalent." Cue: Comments:
Determine Shutdown Margin STEP Performance:                                   Standard:                                     Critical: Grade
Recording data is not critical.
#9 4.3.6 Refer To RE Curve and Data Book and     Examinee uses 8000 MWD/MTU as burnup         Y~NO      so uo DETERMINE the Required Xenon Free       value and a Tavg of 532 &deg;F and determines Shutdown Boron Concentration as         required shutdown boron concentration from follows:                                 the RE Curve and Data Book (RE-B-01) is
9 PERFORMANCE INFORMATION JPMNumber:
: a. IF Shutdown CEA Groups are           786 ppm (Tolerance: 780 ppm to 790 ppm]
JPM-A1.2R Revision:
inserted, Refer To RE Curve RE-B-01, "3.6% Shutdown Boron       Note tabular RE-B-01 provides 786 ppm for Concentration vs. Moderator         8000 MWD/MTU.
3 Task Title: Determine Shutdown Margin STEP Performance:
Temperature," and DETERMINE the required xenon free shutdown boron concentration as a function of RCS   Examinee records required xenon free         YON~      so uo temperature (TAVG) and core         shutdown boron concentration value of 786 burn up.                             ppm (780 ppm to 790 ppm) on OP 2208-013"
Standard:
: b. IF Shutdown CEA Groups are           in "Required Xe Free CB."
Critical:
withdrawn OR are anticipated to be withdrawn, Refer To RE Curve RE-B-03, "Minimum Boron Concentration, No Xenon, Keff   =
Grade #12 4.3.8 DETERMINE the "Total Required Xe Examinee adds 786 ppm (Required Xe Free Y[gj ND so uo Free CB" as follows: CB") and 350 ppm (Stuck Rod Boron a. ADD the values of "Required Xe Equivalent) to come up with 1136 ppm. Free CB" and "Stuck Rod Boron [Tolerance:
0.99, Shutdown CEAs - Withdrawn, HZP," and DETERMINE the required xenon free shutdown boron concentration as a function of core burnup.
1130 ppm to 1140 ppm] Equivalent." b. RECORD result in "Total Required Examinee records the Total Required Xe Free Xe Free CB." CB of 1136 ppm on the OP 2208-013 form. YD N[gj so uo Cue: Comments:
: c. RECORD required xenon free shutdown boron concentration value in "Reauired Xe Free CB."
STEP Performance:
Cue:
Standard:
Comments:
Critical:
8
Grade #13 4.3.9 WHEN sample results are obtained, Examinee records present RCS boron YD N[gj so uo RECORD present RCS Boron concentration of 650 ppm, given in the Initial Concentration.
 
Conditions, on OPS Form 2208-13. Cue: Comments:
PERFORMANCE INFORMATION JPM Number:         JPM-A1 .2R                                               Revision:       3 Task
STEP Performance:
 
Standard:
==Title:==
Critical:
Determine Shutdown Margin STEP Performance:                                 Standard:                                         Critical: Grade
Grade #14 4.3.10 RECORD Date and Time that RCS Examinee records Date and Time that RCS YD N[gj so uo boron sample was obtained.
#10 NOTE:                                         Examinee reads and acknowledges the             Y0Ni:g]   so uo FSAR Chapter 14 main steam line break         NOTE.
boron sample was obtained on OP 2208-013.
analysis uses the additional 350 ppm boration to disposition a main steam line break event initiated in MODE 3 with SIAS blocked. With SIAS blocked, the accident analysis does not credit boration from the HPSI pumps.
The initial conditions state that the sample was collected today, 15 minutes after the plant trip, at 1345. Cue: Comments:
Cue:
10 PERFORMANCE INFORMATION JPM Number: JPM-A1.2R Revision:
Comments:
3 ------------------
STEP Performance:                                   Standard:                                       Critical: Grade
Task Title: Determine Shutdown Margin STEP Performance:
#11 4.3.7 DETERMINE the "Stuck Rod Boron           Examinee from initial conditions identifies that Y0N0     so uo Equivalent" as follows: [Ref. 6.5]       one regulating CEA did not insert into the core
Standard:
: a. RECORD the number of untrippable     when the unit was tripped.
Critical:
CEAs not inserted.                   Examinee records one CEA not inserted,
Grade #15 NOTE Examinee reads and understands the note.
: b. MULTIPLY the value recorded in       multiplies one times 350 ppm and records step 4.3. 7.a. by 350 ppm.           "Stuck Rod Boron Equivalent" as 350 ppm.
so uo SHUTDOWN MARGIN is adequate if the value calculated in step 4.3.11 is positive, which indicates that the present RCS boron concentration is greater than the total required shutdown boron concentration.
: c. RECORD result in "Stuck Rod Boron Equivalent."
Cue: Comments:
Cue:
STEP Performance:
Comments: Recording data is not critical.
Standard:
9
Critical:
 
Grade #16 4.3.11 SUBTRACT "Total Required Xe Free Examinee subtracts 1136 ppm (Total so uo CB" from present RCS boron Required Xe Free CB) from 650 ppm (present concentration and RECORD result RCS boron concentration).
PERFORMANCE INFORMATION JPMNumber:       JPM-A1.2R
AND sign (-or+) in "SHUTDOWN MARGIN Without Xenon Credit." 650 ppm -1136 ppm = -486 ppm, with [Tolerance:  
                          ~~~~~~~~~~~~~~~~~~~
-480 ppm to -490 ppm]. Examinee records result (486 ppm) AND sign so uo (-)in "SHUTDOWN MARGIN Without Xenon Credit" on the OP 2208-013 form. Cue: Comments:
Revision:     3 Task
11 PERFORMANCE INFORMATION JPMNumber:
 
JPM-A1.2R Revision:
==Title:==
3 Task Title: Determine Shutdown Margin STEP Performance:
Determine Shutdown Margin STEP Performance:                               Standard:                                         Critical: Grade
Standard:
#12 4.3.8 DETERMINE the "Total Required Xe   Examinee adds 786 ppm (Required Xe Free           Y[gj ND   so uo Free CB" as follows:               CB") and 350 ppm (Stuck Rod Boron
Critical:
: a. ADD the values of "Required Xe   Equivalent) to come up with 1136 ppm.
Grade #17 4.3.12 CHECK that present RCS boron Examinee compares present RCS born (650 so uo concentration is greater than xenon ppm) against xenon free shutdown boron free shutdown boron concentration.
Free CB" and "Stuck Rod Boron     [Tolerance: 1130 ppm to 1140 ppm]
concentration ( 1136 ppm). Cue: Comments:
Equivalent."
STEP Performance:
: b. RECORD result in "Total Required Examinee records the Total Required Xe Free Xe Free CB."                     CB of 1136 ppm on the OP 2208-013 form.           YD N[gj   so uo Cue:
Standard:
Comments:
Critical:
STEP Performance:                               Standard:                                         Critical: Grade
Grade #18 4.3.13 IF present RCS boron concentration Examinee recognizes that present RCS boron so uo is less than the total required xenon concentration (650 ppm) is less than the total free shutdown boron concentration required xenon free shutdown boron for current plant condition, concentration ( 1136 ppm) for current plant PERFORM one of the following:
#13 4.3.9 WHEN sample results are obtained,   Examinee records present RCS boron               YD N[gj   so uo RECORD present RCS Boron           concentration of 650 ppm, given in the Initial Concentration.                     Conditions, on OPS Form 2208-13.
condition.
Cue:
* IF time after shutdown is less than 72 hours, Go To step 4.3.15 Either path, PERFORM xenon correction or so uo and PERFORM xenon correction.
Comments:
performing Emergency Boration are
STEP Performance:                               Standard:                                         Critical: Grade
* Refer To AOP 2558, "Emergency acceptable.
#14 4.3.10 RECORD Date and Time that RCS     Examinee records Date and Time that RCS           YD N[gj   so uo boron sample was obtained.         boron sample was obtained on OP 2208-013.
The initial conditions state that the sample was collected today, 15 minutes after the plant trip, at 1345.
Cue:
Comments:
10
 
PERFORMANCE INFORMATION JPM Number:
                          -JPM-A1.2R
                              -----------------                                       Revision:    3 Task
 
==Title:==
Determine Shutdown Margin STEP Performance:                                   Standard:                                   Critical: Grade
#15 NOTE                                         Examinee reads and understands the note. YON~      so uo SHUTDOWN MARGIN is adequate if the value calculated in step 4.3.11 is positive, which indicates that the present RCS boron concentration is greater than the total required shutdown boron concentration.
Cue:
Comments:
STEP Performance:                                   Standard:                                   Critical: Grade
#16 4.3.11 SUBTRACT "Total Required Xe Free CB" from present RCS boron Examinee subtracts 1136 ppm (Total         Y~NO      so uo Required Xe Free CB) from 650 ppm (present concentration and RECORD result         RCS boron concentration).
AND sign (-or+) in "SHUTDOWN MARGIN Without Xenon Credit."           650 ppm - 1136 ppm = - 486 ppm, with
[Tolerance: - 480 ppm to - 490 ppm].
Examinee records result (486 ppm) AND sign
(-)in "SHUTDOWN MARGIN Without Xenon       YON~      so uo Credit" on the OP 2208-013 form.
Cue:
Comments:
11
 
PERFORMANCE INFORMATION JPMNumber:           JPM-A1.2R                                                 Revision:         3 Task
 
==Title:==
Determine Shutdown Margin STEP Performance:                                     Standard:                                         Critical:       Grade
#17 4.3.12 CHECK that present RCS boron concentration is greater than xenon Examinee compares present RCS born (650           YON~            so uo ppm) against xenon free shutdown boron free shutdown boron concentration.       concentration ( 1136 ppm).
Cue:
Comments:
STEP Performance:                                     Standard:                                         Critical:       Grade
#18 4.3.13 IF present RCS boron concentration       Examinee recognizes that present RCS boron       YON~            so uo is less than the total required xenon   concentration (650 ppm) is less than the total free shutdown boron concentration       required xenon free shutdown boron for current plant condition,             concentration ( 1136 ppm) for current plant PERFORM one of the following:           condition.
* IF time after shutdown is less than 72 hours, Go To step 4.3.15 and PERFORM xenon correction.
Either path, PERFORM xenon correction or         YON~            so uo performing Emergency Boration are
* Refer To AOP 2558, "Emergency     acceptable.
Boration," and PERFORM emergency boration and ESTABLISH actual RCS boron concentration to greater than the total required xenon free shutdown boron concentration.
Boration," and PERFORM emergency boration and ESTABLISH actual RCS boron concentration to greater than the total required xenon free shutdown boron concentration.
Cue: If examinee decides to Emergency Borate then direct, as the Unit Supervisor, to Go To step 4.3.15 and PERFORM xenon correction.
Cue: If examinee decides to Emergency Borate then direct, as the Unit Supervisor, to Go To step 4.3.15 and PERFORM xenon correction. Go to step 4.3.15 and PERFORM xenon correction.
Go to step 4.3.15 and PERFORM xenon correction.
Comments: The initiating cue states that the Unit Supervisor has directed you to verify adequate SOM for the first full hour immediately following a plant trip, taking advantage of the Xenon worth modification option and existing plant conditions.
Comments:
The initiating cue states that the Unit Supervisor has directed you to verify adequate SOM for the first full hour immediately following a plant trip, taking advantage of the Xenon worth modification option and existing plant conditions.
Step 4.3.14 is N/A since step 4.3.13 sends you directly to step 4.3.15 and step 4.3.14 is for anticipated plant conditions.
Step 4.3.14 is N/A since step 4.3.13 sends you directly to step 4.3.15 and step 4.3.14 is for anticipated plant conditions.
12 PERFORMANCE INFORMATION JPM Number: JPM-A1 .2R Revision:
12
3 Task Title: Determine Shutdown Margin STEP Performance:
 
Standard:
PERFORMANCE INFORMATION JPM Number:     JPM-A1 .2R
Critical:
                          ~~~~~~~~~~~~~~~~~~~
Grade #19 NOTE Examinee reads and understands the note. YD NISI so uo Crediting xenon worth for the next 24 hour period is preferred over hourly calculations.
Revision:       3 Task
 
==Title:==
Determine Shutdown Margin STEP Performance:                                   Standard:                                       Critical:       Grade
#19 NOTE                                           Examinee reads and understands the note.         YD NISI         so uo Crediting xenon worth for the next 24 hour period is preferred over hourly calculations.
If the 24 hour xenon corrected shutdown boron concentration is not met, use of the hourly method may be necessary.
If the 24 hour xenon corrected shutdown boron concentration is not met, use of the hourly method may be necessary.
Cue: Comments:
Cue:
The initiating cue states that the Unit Supervisor has directed you to verify adequate SOM for the first full hour immediately following a plant trip 13 PERFORMANCE INFORMATION JPMNumber:
Comments: The initiating cue states that the Unit Supervisor has directed you to verify adequate SOM for the first full hour immediately following a plant trip 13
JPM-A1.2R Revision:
 
3 Task Title: Determine Shutdown Margin STEP Performance:
PERFORMANCE INFORMATION JPMNumber:         JPM-A1.2R                                                   Revision:       3 Task
Standard:
 
Critical:
==Title:==
Grade #20 4.3.15 IF xenon worth credit is applicable Examines recognizes that the initiating cue YD Nrg] so uo (i.e., post trip or shutdown), directs you to verify adequate SOM for the first PERFORM the following:
Determine Shutdown Margin STEP Performance:                                   Standard:                                       Critical:   Grade
full hour immediately following a plant trip, a. DETERMINE the Xenon taking advantage of the Xenon worth Reactivity worth as follows: modification.
#20 4.3.15 IF xenon worth credit is applicable (i.e., post trip or shutdown),
Therefore step 4.3.15.a.1 and 1) IF crediting Xenon Worth for the 4.3.15.a.2 are N/A. next 24 hour period, CHECK the "Next 24 hours" box. 2) IF crediting Xenon Worth for the next 24 hour period, Refer To one of the following and DETERMINE xenon reactivity worth expected at the end of the 24 hour period: * "Xenon -Samarium Post Trip Report" (printed automatically on Control Room printer following reactor trips)
Examines recognizes that the initiating cue      YD    Nrg] so uo directs you to verify adequate SOM for the first PERFORM the following:                 full hour immediately following a plant trip,
* RE Curve and Data Book *"XENON-SAMARIUM DEMAND" program (PPG)
: a. DETERMINE the Xenon                 taking advantage of the Xenon worth Reactivity worth as follows:         modification. Therefore step 4.3.15.a.1 and 4.3.15.a.2 are N/A.
* Reactor Engineering Cue: Comments:
: 1) IF crediting Xenon Worth for the next 24 hour period, CHECK the "Next 24 hours" box.
14 PERFORMANCE INFORMATION JPM Number: JPM-A1 .2R Revision:
: 2) IF crediting Xenon Worth for the next 24 hour period, Refer To one of the following and DETERMINE xenon reactivity worth expected at the end of the 24 hour period:
3 Task Title: Determine Shutdown Margin STEP Performance:
                  * "Xenon - Samarium Post Trip Report" (printed automatically on Control Room printer following reactor trips)
NOTE Standard:
* RE Curve and Data Book
Critical:
                    *"XENON-SAMARIUM DEMAND" program (PPG)
Grade #21 When determining the smallest xenon Examinee reads and understands the note YO NC8;1 so uo reactivity worth expected to occur at any and determines that xenon is building in. time during the next one hour period, the following should be considered:
* Reactor Engineering Cue:
Comments:
14
 
PERFORMANCE INFORMATION JPM Number:         JPM-A1 .2R                                                 Revision:       3 Task
 
==Title:==
Determine Shutdown Margin STEP Performance: NOTE                               Standard:                                       Critical:     Grade
#21 When determining the smallest xenon             Examinee reads and understands the note         YO NC8;1     so uo reactivity worth expected to occur at any       and determines that xenon is building in.
time during the next one hour period, the following should be considered:
* If xenon is building in, the value at the beginning of the hour should be used.
* If xenon is building in, the value at the beginning of the hour should be used.
* If xenon is decaying, the value at the end of the hour should be used. Cue: Comments:
* If xenon is decaying, the value at the end of the hour should be used.
STEP Performance:
Cue:
Standard:
Comments:
Critical:
STEP Performance:                                   Standard:                                       Critical:     Grade
Grade #22 3) IF crediting Xenon Worth hourly, CHECK Examinee checks the hourly box on YO NC8;1 so uo the "Hourly" box. OP 2208-013.
#22 3) IF crediting Xenon Worth hourly, CHECK       Examinee checks the hourly box on               YO NC8;1     so uo the "Hourly" box.                           OP 2208-013.
: 4) IF crediting Xenon Worth hourly, Refer To one of the following and DETERMINE the smallest xenon reactivity worth expected within the hour being evaluated:  
: 4) IF crediting Xenon Worth hourly, Refer To one of the following and DETERMINE the smallest xenon reactivity worth expected within the hour being evaluated:
* "Xenon-Samarium Post Trip Report" (printed automatically on Control Room Examinee obtains from the RE Curve and YC8;] NO so uo printer following reactor trips) Data Book (RE-C-01) and determines the
        * "Xenon-Samarium Post Trip Report" (printed automatically on Control Room printer following reactor trips)
* RE Curve and Data Book xenon reactivity worth value at the beginning  
Examinee obtains from the RE Curve and Data Book (RE-C-01) and determines the YC8;] NO      so uo
* "XENON-SAMARIUM DEMAND" of the hour = 2.676 %Lip (time zero) for MOC program on PPC (8,000 MTD/MTU) life conditions.
* RE Curve and Data Book                   xenon reactivity worth value at the beginning
* Reactor Engineering
        * "XENON-SAMARIUM DEMAND"                   of the hour = 2.676 %Lip (time zero) for MOC program on PPC                         (8,000 MTD/MTU) life conditions.
[Tolerance:
* Reactor Engineering                       [Tolerance: 2.650 %Lip to 2.700 %Lip]
2.650 %Lip to 2.700 %Lip] Cue: If asked which source to use, state that only the RE Curve and Data Book is available for use. (PPC is NOT available.)
Cue: If asked which source to use, state that only the RE Curve and Data Book is available for use. (PPC is NOT available.)
Comments:
15
 
PERFORMANCE INFORMATION JPMNumber:        JPM-A1.2R                                              Revision:    3 Task
 
==Title:==
Determine Shutdown Margin STEP Performance:                              Standard:                                    Critical: Grade
#23 5) RECORD the source of the xenon          Examinee records RE Curve and Data Book      YO NIS:]  so uo reactivity data.                        (RE-C-01) as the source of the xenon
: 6) RECORD xenon reactivity value in        reactivity data on OP 2208-013.
        "Xenon p."                              Examinee records xenon reactivity value of 2.676 %.1p (2.650 -2.700 %.1p) in "Xenon p."
Cue:
Comments:
Comments:
15 PERFORMANCE INFORMATION JPMNumber:
STEP Performance:                               Standard:                                   Critical: Grade
JPM-A1.2R Revision:
#24 b. DETERMINE Inverse Boron Worth as       Examinee uses 8,000 MWD/MTU burnup to       YIS:] NO so uo follows:                               determine 109.5 ppm/%.1p inverse boron
3 Task Title: Determine Shutdown Margin STEP Performance:
: 1) Refer To RE Curve and Data Book,     worth from the RE Curve and Data Book (RE-Curve RE-F-02, "Inverse Boron Worth F-02).
Standard:
versus Burnup, HFP, ARO," and       [Tolerance: 109.3 ppm/%.1p to 109.7 DETERMINE Inverse Boron Worth at   ppm/%.1p) present burnup.
Critical:
Examinee records 109.5 ppm/%.1p for Inverse YO NIS:] so uo
Grade #23 5) RECORD the source of the xenon Examinee records RE Curve and Data Book YO NIS:] so uo reactivity data. (RE-C-01) as the source of the xenon 6) RECORD xenon reactivity value in reactivity data on OP 2208-013. "Xenon p." Examinee records xenon reactivity value of 2.676 %.1p (2.650 -2.700 %.1p) in "Xenon p." Cue: Comments:
: 2) RECORD Inverse Boron Worth in         Boron Worth in "IBW" on OP 2208-013.
STEP Performance:
            "IBW."
Standard:
Cue:
Critical:
Grade #24 b. DETERMINE Inverse Boron Worth as Examinee uses 8,000 MWD/MTU burnup to YIS:] NO so uo follows: determine 109.5 ppm/%.1p inverse boron 1) Refer To RE Curve and Data Book, worth from the RE Curve and Data Book (RE-Curve RE-F-02, "Inverse Boron Worth F-02). versus Burnup, HFP, ARO," and [Tolerance:
109.3 ppm/%.1p to 109.7 DETERMINE Inverse Boron Worth at ppm/%.1p) present burnup. Examinee records 109.5 ppm/%.1p for Inverse YO NIS:] so uo 2) RECORD Inverse Boron Worth in Boron Worth in "IBW" on OP 2208-013. "IBW." Cue: Comments:
16 PERFORMANCE INFORMATION JPMNumber:
JPM-A1.2R Revision:
3 Task Title: Determine Shutdown Margin STEP Performance:
Standard:
Critical:
Grade #25 c. DETERMINE "Boron Equivalent Xe" as Examinee multiplies 2.676 (2.650 -Yi:8] ND so uo follows: 2.700 "Xenon p" by 109.5
: 1) MULTIPLY "Xenon p" by "IBW." (109.3 -109.7 "IBW." 2) RECORD result in "Boron Equivalent 2.676 x 109.5
= 293.0 ppm Xe." 2.650 x 109.3
= 289.6 ppm 2.700 x 109.7
= 296.2 ppm [Tolerance:
289.6 ppm to 296.2 ppm] Examinee records result 293.0 ppm (289.6 ppm to 296.2 ppm) in "Boron Equivalent Xe" YD Ni:8] so uo on 2208-013.
Cue: Comments:
17 PERFORMANCE INFORMATION JPMNumber:
JPM-A1.2R Revision:
3 Task Title: Determine Shutdown Margin STEP Performance:
Standard:
Critical:
Grade #26 d. RECORD the "Required Xe Free CB" Examinee records the Total Required Xe Free YO N[gj so uo value from step 4.3.8. CB of 1136 ppm on the OP 2208-013 form. e. DETERMINE
''Total Required Xe Examinee subtracts "Boron Equivalent Xe" Corrected CB" as follows: from "Total Required Xe Free CB." Y[gj NO so uo 1) SUBTRACT "Boron Equivalent Xe" 1136 ppm -293 ppm = 843.0 ppm from "Total Required Xe Free CB." 1130 ppm -296.2 ppm = 833.8 ppm 2) RECORD result in "Total Required Xe 1140 ppm -289.6 ppm = 850.4 ppm Corrected CB." [Tolerance:
833.8 ppm to 850.4 ppm] Examinee records result in "Total Required Xe YO N[gj so uo Corrected CB." Cue: Note, procedure step 4.3.15.e.1 stated "Total Required Xe Corrected Cs"* This should be, as it is on the form "Total Required Xe Free Cs". A procedure change was processed for this JPM to make this correction.
Comments:
Comments:
STEP Performance:
16
Standard:
 
Critical:
PERFORMANCE INFORMATION JPMNumber:      JPM-A1.2R                                              Revision:    3 Task
Grade #27 f. RECORD present RCS boron Examinee records present RCS boron YO N[gj so uo concentration value from step 4.3.9 concentration of 650 ppm, given in the Initial g. RECORD Date and Time that RCS boron Conditions, on OPS Form 2208-13. sample was obtained in step 4.3.10. Examinee records date and time sample was obtained as stated in the initial conditions; The sample was collected today at 1345. Cue: Comments:
 
18 PERFORMANCE INFORMATION JPMNumber:
==Title:==
JPM-A1.2R Revision:
Determine Shutdown Margin STEP Performance:                             Standard:                                  Critical: Grade
3 ------------------
#25 c. DETERMINE "Boron Equivalent Xe" as    Examinee multiplies 2.676 %~p (2.650 -      Yi:8] ND  so uo follows:                              2.700 %~p) "Xenon p" by 109.5 ppm/%~p
Task Title: Determine Shutdown Margin STEP Performance:
: 1) MULTIPLY "Xenon p" by "IBW."        (109.3 - 109.7 ppm/%~p) "IBW."
Standard:
: 2) RECORD result in "Boron Equivalent  2.676 %~p  x 109.5 ppm/%~p  =293.0 ppm Xe."                              2.650 %~p x 109.3 ppm/%~p =289.6 ppm 2.700 %~p x 109.7 ppm/%~p =296.2 ppm
Critical:
[Tolerance: 289.6 ppm to 296.2 ppm]
Grade #28 NOTE Examinee reads and understands the note. YO NC8) so uo SHUTDOWN MARGIN is adequate if the value calculated in step 4.3.15.h.
Examinee records result 293.0 ppm (289.6 ppm to 296.2 ppm) in "Boron Equivalent Xe" YD Ni:8]  so uo on 2208-013.
is positive, which indicates that the present RCS boron concentration is greater than the total required shutdown boron concentration.
Cue:
Cue: Comments:
Comments:
STEP Performance:
17
Standard:
 
Critical:
PERFORMANCE INFORMATION JPMNumber:        JPM-A1.2R
Grade #29 h. SUBTRACT "Total Required Xe Corrected Examinee subtracts  
                            ~-'-~~~~~~~~~~~~~~~~
'Total Required Xe YC8) NO so uo CB" from present RCS boron Corrected CB" from present RCS boron concentration and RECORD result AND concentration.
Revision:          3 Task
sign (-or+) in "SHUTDOWN MARGIN 650 ppm -843.0 ppm= -193.0 ppm With Xenon Credit." 650 ppm -833.8 ppm = -183.8 ppm 650 ppm -850.4 ppm = -200.4 ppm [Tolerance:  
 
-183.8 ppm to -200.4 ppm] Examinee records result (193.0 ppm) AND YO NC8) so uo sign(-) in "SHUTDOWN MARGIN With Xenon Credit." Cue: Comments:
==Title:==
19 PERFORMANCE INFORMATION JPM Number: JPM-A1 .2R Revision:
Determine Shutdown Margin STEP Performance:                                        Standard:                                           Critical:        Grade
3 Task Title: Determine Shutdown Margin STEP Performance:
#26 d. RECORD the "Required Xe Free CB"                Examinee records the Total Required Xe Free          YO N[gj          so uo value from step 4.3.8.                          CB of 1136 ppm on the OP 2208-013 form.
Standard:
: e. DETERMINE ''Total Required Xe                    Examinee subtracts "Boron Equivalent Xe" Corrected CB" as follows:                      from "Total Required Xe Free CB."
Critical:
: 1) SUBTRACT "Boron Equivalent Xe"              1136 ppm - 293 ppm      = 843.0 ppm Y[gj NO          so uo from "Total Required Xe Free CB."            1130 ppm - 296.2 ppm = 833.8 ppm
Grade #30 i. CHECK that present RCS boron Examinee checks present RCS boron Y[gj ND so uo concentration is greater than the total concentration is greater than the total required required xenon corrected shutdown boron xenon corrected shutdown boron concentration.
: 2) RECORD result in "Total Required Xe          1140 ppm - 289.6 ppm = 850.4 ppm Corrected CB."
concentration.
[Tolerance: 833.8 ppm to 850.4 ppm]
Examinee determines the total required xenon corrected shutdown boron concentration is greater than present RCS boron concentration and that required SOM is not met. Cue:
Examinee records result in "Total Required Xe Corrected CB."                                      YO N[gj          so uo Cue: Note, procedure step 4.3.15.e.1 stated "Total Required Xe Corrected Cs"* This should be, as it is on the form "Total Required Xe Free Cs". A procedure change was processed for this JPM to make this correction.
Comments:
STEP Performance:                                        Standard:                                            Critical:       Grade
#27 f. RECORD present RCS boron                         Examinee records present RCS boron                   YO N[gj         so uo concentration value from step 4.3.9             concentration of 650 ppm, given in the Initial
: g. RECORD Date and Time that RCS boron             Conditions, on OPS Form 2208-13.
sample was obtained in step 4.3.10.             Examinee records date and time sample was obtained as stated in the initial conditions; The sample was collected today at 1345.
Cue:
Comments:
18
 
PERFORMANCE INFORMATION JPMNumber:
                          -JPM-A1.2R
                              -----------------                                       Revision:    3 Task
 
==Title:==
Determine Shutdown Margin STEP Performance:                                   Standard:                                   Critical: Grade
#28 NOTE                                           Examinee reads and understands the note. YO NC8)   so uo SHUTDOWN MARGIN is adequate if the value calculated in step 4.3.15.h. is positive, which indicates that the present RCS boron concentration is greater than the total required shutdown boron concentration.
Cue:
Comments:
STEP Performance:                                   Standard:                                   Critical: Grade
#29 h. SUBTRACT "Total Required Xe Corrected       Examinee subtracts 'Total Required Xe       YC8) NO   so uo CB" from present RCS boron                   Corrected CB" from present RCS boron concentration and RECORD result AND         concentration.
sign (-or+) in "SHUTDOWN MARGIN             650 ppm - 843.0 ppm= - 193.0 ppm With Xenon Credit."
650 ppm - 833.8 ppm = - 183.8 ppm 650 ppm - 850.4 ppm = - 200.4 ppm
[Tolerance: -183.8 ppm to - 200.4 ppm]
Examinee records result (193.0 ppm) AND sign(-) in "SHUTDOWN MARGIN With Xenon     YO NC8)  so uo Credit."
Cue:
Comments:
19
 
PERFORMANCE INFORMATION JPM Number:     JPM-A1 .2R                                                   Revision:       3
                            ~----'----------------~
Task
 
==Title:==
Determine Shutdown Margin STEP Performance:                                   Standard:                                         Critical:   Grade
#30 i. CHECK that present RCS boron               Examinee checks present RCS boron                 Y[gj ND     so uo concentration is greater than the total     concentration is greater than the total required required xenon corrected shutdown boron     xenon corrected shutdown boron concentration.                             concentration.
Examinee determines the total required xenon corrected shutdown boron concentration is greater than present RCS boron concentration and that required SOM is not met.
Cue:
* Inform Examinee that an STA review of the results is NOT required (if asked) .
* Inform Examinee that an STA review of the results is NOT required (if asked) .
* Acknowledge report on Shutdown Margin .
* Acknowledge report on Shutdown Margin .
* State this JPM is complete . Comments:
* State this JPM is complete .
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
TERMINATION CUE: The evaluation for this JPM is concluded.
STOP TIME: ---20 VERIFICATION OF JPM COMPLETION JPMNumber:
STOP TIME: - - -
JPM-A1.2R Revision:
20
3 Date Performed:
 
Student: For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
VERIFICATION OF JPM COMPLETION JPMNumber:                           JPM-A1.2R                                       Revision:           3 Date Performed:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. EVALUATION SECTION: Time Critical Task? D Yes l?S] No Validated Time (minutes):
Student:
I 25 Actual Time to Complete (minutes):
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
I Work Practice Performance:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
D SAT D UNSAT Operator Fundamentals:
EVALUATION SECTION:
D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question #1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:
Time Critical Task?                                 D   Yes l?S] No Validated Time (minutes):                         Actual Time to Complete (minutes):
I    25                                                            I Work Practice Performance:                         D   SAT             D   UNSAT Operator Fundamentals:                             D   SAT             D   UNSAT JPM Question Portion Overall [NLO only]:           D   SAT             D UNSAT               D   N/A Attached Question #1       D   SAT             D UNSAT Attached Question #2       D   SAT             D UNSAT Overall Result of JPM:                             D   SAT             D UNSAT Evaluator:
Print I Sign Areas for Improvement I Comments:
Print I Sign Areas for Improvement I Comments:
21 JPMNumber:
21
Initial Conditions:
 
Initiating Cues: STUDENT HANDOUT JPM-A1.2R Revision:
STUDENT HANDOUT JPMNumber:                JPM-A1.2R                               Revision:           3 Initial Conditions:
3
* The plant tripped from 100% steady-state equilibrium power at 1330, after 2 months of operation.
* The plant tripped from 100% steady-state equilibrium power at 1330, after 2 months of operation.
* On the trip, CEA #1 (Group 7 CEA) stuck fully withdrawn.
* On the trip, CEA #1 (Group 7 CEA) stuck fully withdrawn.
Line 584: Line 748:
* The Chemistry Department sampled the RCS, 15 minutes after the plant trip, and determined the Boron concentration is 650 ppm.
* The Chemistry Department sampled the RCS, 15 minutes after the plant trip, and determined the Boron concentration is 650 ppm.
* Reactor Engineering has indicated core average burnup is 8000 MWD/MTU.
* Reactor Engineering has indicated core average burnup is 8000 MWD/MTU.
Initiating Cues:
* The Unit Supervisor has directed you to verify adequate SOM for the first full hour immediately following a plant trip. Utilize OP 2208 "Reactivity Calculations" section 4.3, crediting Xenon Worth hourly and existing plant conditions.
* The Unit Supervisor has directed you to verify adequate SOM for the first full hour immediately following a plant trip. Utilize OP 2208 "Reactivity Calculations" section 4.3, crediting Xenon Worth hourly and existing plant conditions.
* Report status of Shutdown Margin to the Unit Supervisor after your calculations crediting xenon hourly worth.
* Report status of Shutdown Margin to the Unit Supervisor after your calculations crediting xenon hourly worth.
* An STA review of your results is NOT required.
* An STA review of your results is NOT required.
22 Form Approval I Approval Date 5/30/2016 Effective Date 6/7/2016 Form Cover S/Jeet Generic Information I Form Title Shutdown Margin Determination in MODEs 3, 4 and 5 Reference Procedure Applicable Tech. Spec. OP 2208 This form is being used for the following:
22
0 System Alignment 0 Preventative Maintenance 0 Maintenance Restoration (Retest) Specific Information I 0 Other: OP 2208-13 Rev. 009 Pa e 1of5 Frequency Rev. No. 009 Shutdown Margin Determination in MODEs 3, 4 and 5 Step No. Calculation Date Calculation Time 4.3.2 T,, ,Jc..;;. d.1 1-e ... .-:--Tc*,,Jc,_y I I,.,,,...<!..  
 
,/ *"' v Shutdown Boron Concentration Determination Step No. Parameter/Calculation Value 4.3.3 Core Burnup 8/()()[J MWD/MTU ;/ 4.3.4 RCS Average Temperature (TAvG) 532. op / 4.3.5 Shutdown CEA Groups Position Withdrawn (Circle applicable value) i-' 4.3.6 Shutdown Boron Concentration, No Xenon 78b ppm Required Xe Free CB i/ 4.3.7 ( I )X350ppm ppm # of untrippable CEAs Not Inserted v' Stuck Rod Boron Equivalent i,/ 4.3.8 ( 7'ef&#xa3;, ) + ( 35*0 ) tl3b ppm Required Xe Free CB Stuck Rod Boron Equivalent Total Required Xe Free CB / Present RCS Boron Concentration Step No. Parameter Value 4.3.9 RCS Boron Concentration 650 ppm / Present RCS CB v 4.3.10 RCS Boron Sample Date and Time Date:  
Form Approval     I Approval Date                                            Effective Date 5/30/2016                                               6/7/2016 Form Cover S/Jeet Generic Information     I Form Title                                                                                     Rev. No.
,_, Time: l5'fS-,/ Clt1/e SHUTDOWN MARGIN Without Xenon Credit Step No. Parameter/Calculation Value 4.3.11 ( 6 5l> ) -( 113(:) ) ;/ i/ 486 Present RCS CB Total Required Xe Free CB ppm Acceptance Criteria SHUTDOWN MARGIN is adequate if this value is positive indicating that present RCS Boron Concentration is greater than the Total Required Xenon Corrected Shutdown Boron Concentration.
Shutdown Margin Determination in MODEs 3, 4 and 5                                       009 Reference Procedure               Applicable Tech. Spec.                           Frequency OP 2208 This form is being used for the following:
Determined By: STA Review: OP 2208-13 Rev.009 Page 2 of 5 Shutdown Margin Determination in MODEs 3, 4 and 5 Xenon Correction of Shutdown Boron Concentration Step No. Parameter/Calculation Value 7b 4.3.15.a.
0     System Alignment           0   Preventative Maintenance 0     Other:
Xenon Reactivity (Next 24 Hours O Gr) (Indicate source used: g(; C.vl'v't; r-r'-)., / Xenon p /' 4.3.15.b.
0    Maintenance Restoration (Retest)
Inverse Boron Worth I D'l. !J.
Specific Information   I OP 2208-13 Rev. 009 Pa e 1of5
IBW 1/ ( J.rv 1b ) x c l O'i. 5 f pNi )
 
3 ppm 4.3.15.c.  
Shutdown Margin Determination in MODEs 3, 4 and 5 Step No.                     Calculation Date                                       Calculation Time 4.3.2                           T,, ,Jc..;;. d.1 1-e             ,/
*-Xenon p v IBW /i,Ke j Boron Equivalent Xenon v/ 4.3.15.d.
I I,.,,,...<!.. Tc*,,Jc,_y v
Total Required Xenon Free Shutdown Boron I 13b ppm Concentration (from step ) Total Required Xe Free CB / 4.3.15.e. ( JI 3b ) -( ) 043 ppm Total Required Xe Free CB Boron Equivalent Xe Total Required Xe Corrected CB v/ Present RCS Boron Concentration Step No. Parameter Value 05D ppm 4.3.15.f.
Shutdown Boron Concentration Determination Step No.                 Parameter/Calculation                                               Value 4.3.3     Core Burnup                                                     8/()()[J                     MWD/MTU
RCS Boron Concentration Present RCS CB // 4.3.15.g.
                                                                                                                      ;/
RCS Boron Sample Date and Time Date: /i.,t'd" Time: ;34r;' dct I l/ .' SHUTDOWN MARGIN With Xenon Credit Step No. Parameter/Calculation Value ( r;,,_50 ) -( '8i/ *3 ) v"  
4.3.4     RCS Average Temperature (TAvG)                                                                         op 532.
... 4.3.15.h.
                                                                                                                    /
lCf 3 Present RCS CB / Total Required Xe Corrected CB (-) ppm ./ Acceptance Criteria SHUTDOWN MARGIN is adequate if this value is positive indicating that present RCS Boron Concentration is greater than the Total Required Xenon Corrected Shutdown Boron Concentration.
                                                                                                  ~
Determined By: STA Review: OP 2208-13 Rev. 009 Page 3 of 5 Shutdown Margin Determination in MODEs 3, 4 and 5 II Hourly Xenon Correction Log Date Time Present RCS Boron Total Required Xanon Shutdown Margin with Determined Concentration Corrected CB Xenon Credit By 1 2 3 4 5 6 7 8 9 10 11 12 ppm -ppm = ( ) ppm -ppm = ( ) ppm -ppm = ( ) ppm -ppm = ( ) ppm -ppm = ( ) ppm -ppm = ( ) ppm -ppm = ( ) ppm -ppm = ( ) ppm -ppm = ( ) ppm -ppm = ( ) ppm -ppm = ( ) ppm -ppm = ( )
Shutdown CEA Groups Position 4.3.5                                                                 Withdrawn (Circle applicable value) i-'
Acceptance Criteria SHUTDOWN MARGIN is adequate if this value is positive indicating that present RCS Boron Concentration is greater than the Total Required Xenon Corrected Shutdown Boron Concentration.
4.3.6     Shutdown Boron Concentration, No Xenon 78b                   ppm Required Xe Free CB                         i/
ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm OP 2208-13 Rev. 009 Page 4 of 5 STA Review I 13 14 15 16 17 18 19 20 21 22 23 24 Shutdown Margin Determination in MODEs 3, 4 and 5 Hourly Xenon Correction Log Date Time Present RCS Boron Total Required Xanon Shutdown Margin with Determined Concentration Corrected Cu Xenon Credit ppm -ppm = ( ) ppm ppm -ppm = ( ) ppm ppm -ppm = ( ) ppm ppm -ppm = ( ) ppm ppm -ppm = ( ) ppm ppm -ppm = ( ) ppm ppm -ppm = ( ) ppm ppm -ppm = ( ) ppm ppm -ppm = ( ) ppm ppm -ppm = ( ) ppm ppm -ppm = ( ) ppm ppm -ppm = ( ) ppm * ' Acceptance Criteria SHUTDOWN MARGIN is adequate if this value is positive indicating that present RCS Boron Concentration is greater than the Total Required Xenon Corrected Shutdown Boron Concentration.
4.3.7     (                 I                   )X350ppm                               3.~*o              ppm i,/
OP 2208-13 Rev. 009 Page 5 of 5 By STA Review JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: Complete "A" SW Pump Operability Surveillance, SP 2612A-003 JPMNumber:
            # of untrippable CEAs Not Inserted                 v'   Stuck Rod Boron Equivalent 4.3.8     (         7'ef&#xa3;,       )+(           35*0           )                       tl3b                   ppm Required Xe Free CB       Stuck Rod Boron Equivalent     Total Required Xe Free CB                     /
JPM-A2R Revision:
Present RCS Boron Concentration Step No.                         Parameter                                                     Value 4.3.9     RCS Boron Concentration 650               ppm     /
0/0 Initiated:
v Present RCS CB 4.3.10   RCS Boron Sample Date and Time                             Date: *;1.;~J4:1      ,_, Time:   l5'fS- ,/
Robert L. Cimmino, Jr. (Signature on File) 01/23/2017 Developer Date Reviewed:
Clt1/e SHUTDOWN MARGIN Without Xenon Credit Step No.                 Parameter/Calculation                                               Value 4.3.11   (     6 5l>         )- (       113(:)             )
Will Chesnutt (Signature on File) 01/27/2017 Technical Reviewer Date Approved:
                                                                        ;/                                       i/
Mike Cote (Signature on File) 01/24/2017 Supervisor, Nuclear Training Date 1
Present RCS CB         Total Required Xe Free CB       ~)                486                    ppm Acceptance Criteria SHUTDOWN MARGIN is adequate if this value is positive indicating that present RCS Boron Concentration is greater than the Total Required Xenon Corrected Shutdown Boron Concentration.
Determined By:
STA Review:
OP 2208-13 Rev.009 Page 2 of 5
 
Shutdown Margin Determination in MODEs 3, 4 and 5 Xenon Correction of Shutdown Boron Concentration Step No.                   Parameter/Calculation                                       Value Xenon Reactivity (Next 24 Hours O Houri~ Gr)                          (~~0 7b         %~p 4.3.15.a. (Indicate source used: g(; C.vl'v't; r- J}*~ r'-         )., /           Xenon p             /'
I D'l. !J. ppm/%~p 4.3.15.b. Inverse Boron Worth                                                                                     1/
IBW f pNi
(     J.rv 1b   ~Ike )x c     l O'i. 5
                                                      *-        )                   *a~,
3         ppm 4.3.15.c.
Xenon p     v                 IBW   /i,Ke   j         Boron Equivalent Xenon               v/
4.3.15.d.
Total Required Xenon Free Shutdown Boron                                 I 13b           ppm Concentration (from step )                                     Total Required Xe Free CB               /
(         JI 3b         )- (       ~c,3                )                 043               ppm 4.3.15.e.
Total Required Xe Free CB       Boron Equivalent Xe         Total Required Xe Corrected CB         v/
Present RCS Boron Concentration Step No.                         Parameter                                             Value 05D         ppm 4.3.15.f. RCS Boron Concentration                                                                         //
Present RCS CB 4.3.15.g. RCS Boron Sample Date and Time                               Date:   /i.,t'd" Time:
dct   I   l/
                                                                                                  ;34r;'
SHUTDOWN MARGIN With Xenon Credit Step No.                   Parameter/Calculation                                       Value
(     r;,,_50       )- (     '8i/ *3                     )       v"                                 ...
                                                                                                        ~,,,., ~
4.3.15.h.
Present RCS CB /       Total Required Xe Corrected CB
                                                        ./
(-)           lCf 3          ppm Acceptance Criteria SHUTDOWN MARGIN is adequate if this value is positive indicating that present RCS Boron Concentration is greater than the Total Required Xenon Corrected Shutdown Boron Concentration.
Determined By:
STA Review:
OP 2208-13 Rev. 009 Page 3 of 5
 
Shutdown Margin Determination in MODEs 3, 4 and 5 II Hourly Xenon Correction Log Present RCS Boron           Total Required Xanon       Shutdown Margin with   Determined STA Date    Time                                                                  Xenon Credit          By    Review Concentration                 Corrected CB 1                                     ppm -                         ppm = (   )               ppm 2                                      ppm -                         ppm = (   )               ppm 3                                      ppm  -                         ppm = (   )               ppm 4                                      ppm -                         ppm = (   )               ppm 5                                      ppm -                         ppm = (   )               ppm 6                                      ppm -                         ppm = (   )               ppm 7                                      ppm  -                         ppm = (   )               ppm 8                                      ppm -                         ppm = (   )               ppm 9                                      ppm  -                         ppm = (   )               ppm 10                                      ppm  -                         ppm = (   )               ppm 11                                      ppm  -                         ppm = (   )               ppm 12                                      ppm -                         ppm = (   )               ppm
    ~~~~~~~-~~                        Acceptance Criteria SHUTDOWN MARGIN is adequate if this value is positive indicating that present RCS Boron Concentration is greater than the Total Required Xenon Corrected Shutdown Boron Concentration.
OP 2208-13 Rev. 009 Page 4 of 5
 
Shutdown Margin Determination in MODEs 3, 4 and 5 I
Hourly Xenon Correction Log Present RCS Boron           Total Required Xanon       Shutdown Margin with   Determined STA Date    Time                                        Corrected Cu             Xenon Credit           By    Review Concentration 13                                      ppm -                         ppm = (   )               ppm 14                                      ppm -                         ppm = (   )               ppm 15                                      ppm -                         ppm = (   )               ppm 16                                      ppm -                         ppm = (   )               ppm 17                                      ppm -                         ppm = (   )               ppm 18                                      ppm -                         ppm = (   )               ppm 19                                      ppm -                         ppm = (   )               ppm 20                                      ppm -                         ppm = (   )               ppm 21                                      ppm -                         ppm = (   )               ppm 22                                      ppm -                         ppm = (   )               ppm 23                                      ppm -                         ppm = (   )               ppm 24                                          -                            =
ppm                           ppm   (   )               ppm Acceptance Criteria SHUTDOWN MARGIN is adequate if this value is positive indicating that present RCS Boron Concentration is greater than the Total Required Xenon Corrected Shutdown Boron Concentration.
OP 2208-13 Rev. 009 Page 5 of 5
 
JOB PERFORMANCE MEASURE APPROVAL SHEET JPM
 
==Title:==
Complete "A" SW Pump Operability Surveillance, SP 2612A-003 JPMNumber:     JPM-A2R                                   Revision:       0/0 Initiated:
Robert L. Cimmino, Jr. (Signature on File)             01/23/2017 Developer                                   Date Reviewed:
Will Chesnutt (Signature on File)                   01/27/2017 Technical Reviewer                             Date Approved:
Mike Cote (Signature on File)                     01/24/2017 Supervisor, Nuclear Training                         Date 1


==SUMMARY==
==SUMMARY==
OF CHANGES DATE DESCRIPTION REV/CHANGE 01/04/2017 Initial JPM creation for 2017 NRC Exam Re-Take 010 2 JPM WORKSHEET Facility:
OF CHANGES DATE                           DESCRIPTION           REV/CHANGE 01/04/2017 Initial JPM creation for 2017 NRC Exam Re-Take     010 2
MP2 Exarninee:
 
JPMNumber:
JPM WORKSHEET Facility:     MP2                           Exarninee:
A2R Revision:
JPMNumber:                         A2R                               Revision:
0/0 ----Task Title: Complete "A" SW Pump Operability Surveillance, SP 2612A-003 System: Service Water Time Critical Task: DYES Validated Time (minutes):
                                                                                    - -0/0 Task
15 ------Task Number(s):
 
076-01-096 Applicable To: SRO x STA RO x PEO KIA Number: 2.2.12 KIA Rating: 3.7/4.1 --------Method of Testing: Simulated Performance:
==Title:==
Actual Performance:
Complete "A" SW Pump Operability Surveillance, SP 2612A-003 System:             Service Water Time Critical Task:                   DYES       ~NO Validated Time (minutes):               15 Task Number(s):                         076-01-096 Applicable To:               SRO       x         STA                     RO     x           PEO KIA Number:                 2.2.12             KIA Rating:
x Location:
                                                                  - - -3.7/4.1 Method of Testing:         Simulated Performance:                                   Actual Performance:           x Location:                   Classroom:         x               Simulator:                         In-Plant:
Classroom:
Task Standards:                 At the completion of this JPM the exarninee will have completed surveillance form SP 2612A-003 IAW SP 2612A; calculates the "A" SW pump ~P, determines Mis UNSAT, and notifies the US of the UNSAT results.
x Simulator:
Required Materials:             SP 2612A, "A" Service Water Pump Tests procedure.
In-Plant:
(procedures, equipment, etc.)   SP 2612A-003, "A" SW Pump and Facility 1 Discharge Check Valve IST form.
Task Standards:
General  
Required Materials: (procedures, equipment, etc.) General  


==References:==
==References:==
SP 2612A, "A" Service Water Pump Tests procedure.
                                        *** READ TO THE EXAMINEE ***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
3


At the completion of this JPM the exarninee will have completed surveillance form SP 2612A-003 IAW SP 2612A; calculates the "A" SW pump determines Mis UNSAT, and notifies the US of the UNSAT results. SP 2612A, "A" Service Water Pump Tests procedure.
JPM WORKSHEET JPMNumber:                     JPM-A2R                         Revision:       0/0 Initial Conditions:
SP 2612A-003, "A" SW Pump and Facility 1 Discharge Check Valve IST form. SP 2612A, "A" Service Water Pump Tests procedure.
* Plant is in Mode 1, all conditions normal.
*** READ TO THE EXAMINEE *** I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied.
                                    *   "A" & "C" Service Water Pumps are in service.
With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
                                    *   "A" Service Water Pump surveillance SP 2612A is being performed following an overhaul of the pump strainer.
3 JPM WORKSHEET JPMNumber:
* Only the pump IST is being performed. The flush valve and check valve tests are not required.
JPM-A2R Revision:
0/0 Initial Conditions:
* Plant is in Mode 1, all conditions normal. Initiating Cues: * "A" & "C" Service Water Pumps are in service. * "A" Service Water Pump surveillance SP 2612A is being performed following an overhaul of the pump strainer.
* Only the pump IST is being performed.
The flush valve and check valve tests are not required.
* All vibration data has been recorded on SP 2612A-003.
* All vibration data has been recorded on SP 2612A-003.
The US has directed you to complete surveillance form SP 2612A-003, from step 4.1.l lc.1 through step 4.1.19, using the below listed data, which was obtained simultaneously.
Initiating Cues:                The US has directed you to complete surveillance form SP 2612A-003, from step 4.1.l lc.1 through step 4.1.19, using the below listed data, which was obtained simultaneously. Section 4.1 has been completed up to and including step 4.1.1 lb.
Section 4.1 has been completed up to and including step 4.1.1 lb.
* Discharge Pressure indication on PI-6474 (local)= 38.5 psig
* Discharge Pressure indication on PI-6474 (local)= 38.5 psig * "A" SW Header Flow indication on FIT-6471=10,500 gpm
                                    *   "A" SW Header Flow indication on FIT-6471=10,500 gpm
* Temp Flow Meter at Strainer Backwash Piping flow= 0 gpm
* Temp Flow Meter at Strainer Backwash Piping flow= 0 gpm
* Distance from floor to Circ Water Bay Level= 12.43 ft Simulator Requirements:
* Distance from floor to Circ Water Bay Level= 12.43 ft Simulator Requirements:       NIA
NI A ****NOTES TO TASK PERFORMANCE EVALUATOR****
                  ****NOTES TO TASK PERFORMANCE EVALUATOR****
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). 4 PERFORMANCE INFORMATION JPM Number: JPM-A2R Revision:
: 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
0/0 Task Title:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
SW Pump Operability Surveillance, SP 2612A-003 STARTTThfE:  
4
----STEP Performance:
 
Standard:
PERFORMANCE INFORMATION JPM Number:       JPM-A2R                                                         Revision:   0/0
Critical:
                            --=...::....:.:..:::....=..==-=------------~-~
Grade #1 SP "A" SW Purol! Tests YO Nrgj so uo 4.1.11 WHEN "A" Service Water Pump has Examinee enters applicable data from hritial operated for at least two minutes with Conditions onto form SP 2612A-003 under "Data": stable system flowrate of 10,500 gpm
Task
* 38.5 at step 4.1.1 lc. l) (10,300 to 10,700 gpm), PERFORM the
 
==Title:==
Complet~"A"      SW Pump Operability Surveillance, SP 2612A-003 STARTTThfE: - - - -
STEP Performance:                                       Standard:                                         Critical:   Grade
#1 SP 2612A~ "A" SW Purol! Tests                                                                       YO   Nrgj so uo 4.1.11 WHEN "A" Service Water Pump has             Examinee enters applicable data from hritial operated for at least two minutes with     Conditions onto form SP 2612A-003 under "Data":
stable system flowrate of 10,500 gpm
* 38.5 at step 4.1.1 lc. l)
(10,300 to 10,700 gpm), PERFORM the
* 10,500 at step 4.1.llc.2) following:
* 10,500 at step 4.1.llc.2) following:
* 0 at step 4.1.1 lc.3) a. NI A [completed per IC] b. NI A [completed per IC] c. OBTAIN the following simultaneously, and RECORD on SP 2612A-003:
* 0 at step 4.1.1 lc.3)
: a. NI A [completed per IC]
: b. NI A [completed per IC]
: c. OBTAIN the following simultaneously, and RECORD on SP 2612A-003:
: 1) "A" Service Water Pump discharge pressure (PI-6474, strainer inlet pressure).
: 1) "A" Service Water Pump discharge pressure (PI-6474, strainer inlet pressure).
: 2) Service Water Header "A" flow (FIT-6471).
: 2) Service Water Header "A" flow (FIT-6471).
: 3) Strainer backwash discharge flow from temporary flow meter. Cue: Comments:
: 3) Strainer backwash discharge flow from temporary flow meter.
Examinee will calculate total SW flow and determine IST acceptance criteria is SAT. 5 PERFORMANCE INFORMATION JPM Number: JPM-A2R Revision:
Cue:
0/0 Task Title: Complete "A" SW Pump Operability Surveillance, SP 2612A-003 STEP Performance:
Comments: Examinee will calculate total SW flow and determine IST acceptance criteria is SAT.
SP 2612A (cont) Standard:
5
Critical:
 
Grade #2 4.1.12 OBTAIN "A" Service Water Pump sea Examinee records distance from floor to CW bay YO N[gj so uo level, by performing the following:
PERFORMANCE INFORMATION JPM Number:           JPM-A2R
level (12.43 ft) on form SP 2612A-003 at step a. REQUEST local operator to Refer To 4.1.12b under "Level Indicator Data". Attachment 3 and measure the distance Examinee calculates Sea Level as: from floor to circulating water bay level. Y[gj NO so uo b. RECORD distance from floor to Exarninee calculated sea level; circulating water bay level on SP 2612A-(14-12.43 = 1.57 ft) [Tolerance:
                              --=..:=:..::....=.:==-=-~~~~~~~~~~~~~~~
1.5 to 1.6] 003. c. RECORD water level indicator NQ Examinee records 1.57 on SP 2612A-003, step YO N[gj so uo Number on SP 2612A-003 cover page. 4.1.12e under "Calculated Data". d. CALCULATE sea level as follows: Sea level = 14 -Distance from floor to water level e. RECORD sea level on SP 2612A-003.
Revision: 0/0 Task
Cue: Comments:
 
Recording of data is NOT critical.
==Title:==
STEP Performance:
Complete "A" SW Pump Operability Surveillance, SP 2612A-003 STEP Performance: SP 2612A (cont)                         Standard:                                         Critical: Grade
SP 2612A (cont) Standard:
#2 4.1.12 OBTAIN "A" Service Water Pump sea             Examinee records distance from floor to CW bay   YO N[gj   so uo level, by performing the following:         level (12.43 ft) on form SP 2612A-003 at step
Critical:
: a. REQUEST local operator to Refer To         4.1.12b under "Level Indicator Data".
Grade #3 4.1.13 CALCULATE pump suction pressure as Examinee calculates pump suction pressure as: Y[gj NO so uo follows: [1.57 x 0.45 = 0.71] Suction pressure = Sea level x 0.45 [Tolerance:
Attachment 3 and measure the distance       Examinee calculates Sea Level as:
0.675 to 0.72] Cue: Comments:
from floor to circulating water bay level.
6 PERFORMANCE INFORMATION JPM Number:
: b. RECORD distance from floor to                 Exarninee calculated sea level; Y[gj NO    so uo circulating water bay level on SP 2612A-   (14- 12.43 = 1.57 ft) [Tolerance: 1.5 to 1.6]
Revision:
003.
0/0 Task Title: Complete "A" SW Pump Operability Surveillance, SP 2612A-003 STEP Performance:
: c. RECORD water level indicator NQ             Examinee records 1.57 on SP 2612A-003, step     YO N[gj   so uo Number on SP 2612A-003 cover page.         4.1.12e under "Calculated Data".
SP 2612A (cont) Standard:
: d. CALCULATE sea level as follows:
Critical:
Sea level = 14 - Distance from floor to water level
Grade #4 4.1.14 RECORD pump suction pressure on Examinee records suction pressure [O. 71] on YO N[ZJ so uo SP 2612A-003.
: e. RECORD sea level on SP 2612A-003.
SP 2612A-003, step 4.1.14 under "Data". Cue: Comments:
Cue:
STEP Performance:
Comments: Recording of data is NOT critical.
SP 2612A (cont) Standard:
STEP Performance: SP 2612A (cont)                         Standard:                                         Critical: Grade
Critical:
#3 4.1.13 CALCULATE pump suction pressure as           Examinee calculates pump suction pressure as:
Grade #5 4.1.15 Using step 4.1.1 lc.1) and 4.1.14 Examinee calculates "A" SW Pump Y[ZJ NO so uo pressures, PERFORM the following: =Discharge (38.5) -Suction (0.71)= 37.8 psig a. CALCULATE "A" SW Pump follows: [Tolerance:
Y[gj NO   so uo follows:
37.78 to 37.82) LlP = Discharge  
[1.57 x 0.45 = 0.71]
-Suction pressure b. RECORD "A" SW Pump on Examinee records (37.8 psig) on SP 2612A-YO N[ZJ so uo SP 2612A-003.
Suction pressure = Sea level x 0.45
003, step 4.1.15b. under"Data".
[Tolerance: 0.675 to 0.72]
Cue: Comments:
Cue:
Recording of data is NOT critical.
Comments:
STEP Performance:
6
SP 2612A (cont) Standard:
 
Critical:
PERFORMANCE INFORMATION JPM Number:     .....:JP=-::....::M.:..:::....:-A.:::2:::R~--------------        Revision: 0/0 Task
Grade #6 4.1.16 DOCUMENT "A" SW Pump Results Examinee documents "A" SW Pump Results on Y[ZJ NO so uo SP 2612A-003.
 
SP2612A-003, step 4.1.16 as "UNSAT" for both "Acceptable" and "Normal" limits. Cue: Comments:
==Title:==
7 PERFORMANCE INFORMATION JPM Number: JPM-A2R Revision:
Complete "A" SW Pump Operability Surveillance, SP 2612A-003 STEP Performance: SP 2612A (cont)                     Standard:                                         Critical: Grade
0/0 Task Title: Complete "A" SW Pump Operability Surveillance, SP 2612A-003 STEP Performance:
#4 4.1.14 RECORD pump suction pressure on           Examinee records suction pressure [O. 71] on     YO N[ZJ   so uo SP 2612A-003.                             SP 2612A-003, step 4.1.14 under "Data".
SP 2612A (cont) Standard:
Cue:
Critical:
Comments:
Grade #7 4.1.17 DOCUMENT "A" Service Water Pump Examinee documents "A" SW Pump vibration YD NIZ;J so uD vibration Results on SP 2612A-003.
STEP Performance: SP 2612A (cont)                     Standard:                                         Critical: Grade
Results on SP2612A-003, step 4.1.17 as "SAT" for both "Acceptable" and "Normal" limits. Cue: Comments:
#5 4.1.15 Using step 4.1.1 lc.1) and 4.1.14         Examinee calculates "A" SW Pump ~p Y[ZJ NO   so uo pressures, PERFORM the following:
STEP Performance:
                                                      ~p =Discharge (38.5) - Suction (0.71)= 37.8 psig
SP 2612A (cont) Standard:
: a. CALCULATE "A" SW Pump ~pas follows:                             [Tolerance: 37.78 to 37.82)
Critical:
LlP = Discharge - Suction pressure
Grade #8 4.1.18 DOCUMENT "A" Service Water Pump Examinee documents "A" SW Pump Operational YD NIZ;J so uD Operational Readiness Results on SP Readiness Results on SP2612A-003, step 4.1.18 as 2612A-003. "UNSAT". Cue: Comments:
: b. RECORD "A" SW Pump         ~p on     Examinee records ~p (37.8 psig) on SP 2612A-     YO N[ZJ   so uo SP 2612A-003.                         003, step 4.1.15b. under"Data".
Recording of data is NOT critical.
Cue:
STEP Performance:
Comments: Recording of data is NOT critical.
SP 2612A (cont) Standard:
STEP Performance: SP 2612A (cont)                     Standard:                                         Critical: Grade
Critical:
#6 4.1.16 DOCUMENT "A" SW Pump           ~p Results Examinee documents "A" SW Pump ~p Results on Y[ZJ NO   so uo SP 2612A-003.                             SP2612A-003, step 4.1.16 as "UNSAT" for both "Acceptable" and "Normal" limits.
Grade #9 4.1.19 IF "A" Service Water Pump Operational Examinee refers to Att. 1, Actions for IST Data YIZ;J NO so uD Readiness Results "UNSAT," Refer To Outside "Acceptable" Limits, and notifies the US Attachment
Cue:
: 1. that of the "UNSAT" results. Cue: Comments:
Comments:
Once the Examinee has notified the US of the UNSAT results per Step 1 of Attachment 1, the JPM is complete.
7
 
PERFORMANCE INFORMATION JPM Number:       JPM-A2R
                          -=-::...::..::.....:..=:=-=.~~~~~~~~~~~~~~~
Revision:     0/0 Task
 
==Title:==
Complete "A" SW Pump Operability Surveillance, SP 2612A-003 STEP Performance: SP 2612A (cont)                   Standard:                                             Critical:       Grade
#7 4.1.17 DOCUMENT "A" Service Water Pump         Examinee documents "A" SW Pump vibration             YD NIZ;J       so uD vibration Results on SP 2612A-003.       Results on SP2612A-003, step 4.1.17 as "SAT" for both "Acceptable" and "Normal" limits.
Cue:
Comments:
STEP Performance: SP 2612A (cont)                   Standard:                                             Critical:       Grade
#8 4.1.18 DOCUMENT "A" Service Water Pump         Examinee documents "A" SW Pump Operational YD NIZ;J       so uD Operational Readiness Results on SP     Readiness Results on SP2612A-003, step 4.1.18 as 2612A-003.                               "UNSAT".
Cue:
Comments: Recording of data is NOT critical.
STEP Performance: SP 2612A (cont)                   Standard:                                             Critical:       Grade
#9 4.1.19 IF "A" Service Water Pump Operational   Examinee refers to Att. 1, Actions for IST Data YIZ;J NO       so uD Readiness Results "UNSAT," Refer To     Outside "Acceptable" Limits, and notifies the US Attachment 1.                           that of the "UNSAT" results.
Cue:
Comments: Once the Examinee has notified the US of the UNSAT results per Step 1 of Attachment 1, the JPM is complete.
TERMINATION CUE: The evaluation for this JPM is concluded.
TERMINATION CUE: The evaluation for this JPM is concluded.
STOPTThlE:  
STOPTThlE: - - -
---8 VERIFICATION OF JPM COMPLETION JPMNumber:
8
JPM-A2R Revision:
 
0/0 Date Performed:
VERIFICATION OF JPM COMPLETION JPMNumber:                             JPM-A2R                                       Revision:         0/0 Date Performed:
Student: For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
Student:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. EVALUATION SECTION: Time Critical Task? 0 Yes [;8J No Validated Time (minutes):
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
I 15 Actual Time to Complete (minutes):
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
I Work Practice Performance:
EVALUATION SECTION:
D SAT D UNSAT Operator Fundamentals:
Time Critical Task?                                 0   Yes [;8J No Validated Time (minutes):               15         Actual Time to Complete (minutes):
D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question # 1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:
I                                                                  I Work Practice Performance:                         D   SAT             D   UNSAT Operator Fundamentals:                             D   SAT             D   UNSAT JPM Question Portion Overall [NLO only]:           D   SAT             D   UNSAT               D   N/A Attached Question # 1       D   SAT             D   UNSAT Attached Question #2       D   SAT             D UNSAT Overall Result of JPM:                             D   SAT             D   UNSAT Evaluator:
Print I Sign Areas for Improvement I Comments:
Print I Sign Areas for Improvement I Comments:
9 JPMNumber:
9
Initial Conditions:
 
Initiating Cues: STUDENT HANDOUT JPM-A2R Revision:
STUDENT HANDOUT JPMNumber:                JPM-A2R                                 Revision:           0/0 Initial Conditions:
0/0
* Plant is in Mode 1, all conditions normal.
* Plant is in Mode 1, all conditions normal. * "A" & "C" Service Water Pumps are in service. * "A" Service Water Pump surveillance SP 2612A is being performed following an overhaul of the pump strainer.
                    *   "A" & "C" Service Water Pumps are in service.
* Only the pump IST is being performed.
                    *   "A" Service Water Pump surveillance SP 2612A is being performed following an overhaul of the pump strainer.
The flush valve and check valve tests are not required.
* Only the pump IST is being performed. The flush valve and check valve tests are not required.
* All vibration data has been recorded on SP 2612A-003.
* All vibration data has been recorded on SP 2612A-003.
The US has directed you to complete surveillance form SP 2612A-003, from step 4.1.11 c.1 through step 4.1.19, using the below listed data, which was obtained simultaneously.
Initiating Cues:    The US has directed you to complete surveillance form SP 2612A-003, from step 4.1.11 c.1 through step 4.1.19, using the below listed data, which was obtained simultaneously. Section 4.1 has been completed up to and including step 4.1.11 b.
Section 4.1 has been completed up to and including step 4.1.11 b.
* Discharge Pressure indication on PI-6474 (local)= 38.5 psig
* Discharge Pressure indication on PI-6474 (local)= 38.5 psig * "A" SW Header Flow indication on FIT-6471 = 10,500 gpm
                        *   "A" SW Header Flow indication on FIT-6471 = 10,500 gpm
* Temp Flow Meter at Strainer Backwash Piping flow = 0 gpm
* Temp Flow Meter at Strainer Backwash Piping flow = 0 gpm
* Distance from floor to Circ Water Bay Level= 12.43 ft 10
* Distance from floor to Circ Water Bay Level= 12.43 ft 10
. ' Form Approval I Approval Date 11/23/15 Effective Date 11/23/15 Suveillance Form Generic Information Form Title ''A!' SW Pump and Facility 1 Discharge Check Valve IST Reference Procedure SP 2612A Applicable TS{TRM 4.0.5; TRM Table 7.1.21-2 Item A Specific Information I Schedule Start Date Al A Performance Modes I Prerequisites Completed (Initials)
 
All Applicability (TS{TRM) All MODEs WO Number Precautions Noted (Initials) .cJ F Test Authorized By Date U 111 f S'v f} e .--v; v r ,-;c-,-J { /,i_ ,7 -. iv Performed By (Print/Sign)
Form Approval       I Approval Date                                                          Effective Date 11/23/15                                                                 11/23/15 Suveillance Form Generic Information Form Title                                                                                                                   Rev. No.
I Date 17 Accepted By (Print/Sign)
            ''A!' SW Pump and Facility 1 Discharge Check Valve IST                                                             008 Reference Procedure           Applicable TS{TRM                         Applicability (TS{TRM)                Frequency SP 2612A                    4.0.5; TRM Table                         All MODEs                            Every 92 days (Q) 7.1.21-2 Item A Specific Information I Schedule Start Date                                                           WO Number AlA      ~                                                                      Mntc Restoration Performance Modes All I Prerequisites Completed (Initials)               Precautions Noted (Initials)         I xi    Yes      DNo
Date Approved By (Department Head or Designee)
                                                                      ~                                    .cJ
Date Surveillance Information I Test Equipment Type QA Number Vi' ,. ;,,, An,:ilvzer (Vt r*..-d"?,l/Y1 A,.,.,,let " Ml&#xa3; -/J;.'11..( ( Water Level Indicator NO# <Y'Jr75 ("""" Stoowatch  
{,-/,i_ ;c-;..~"~
}/\le:-'* tJ 52..t.b Stopwatch , Temporary Flow Meter .'11\ n:: -it. 3 '61 I Comments I CR# Rev. No. 008 Frequency Every 92 days (Q) Mntc Restoration I xi Yes DNo Partial Surveillance
F Test Authorized By U111 f S'vf} e .--v; ~ vr                          ,7    - .
[iJ Yes DNo Acceptance Criteria Satisfied OYes DNo Cal Due Date tf-/3 o/J7 1-03-.'/17 7)1r/17 '8'/3;/; 7 7/i-1 In NOTE: Following acceptance, copy FORWARDED to IST Coordinator.
Date
D Initial SP 2612A-003 Rev. 008 Page 1of6 
                                                                                          ,-iv J/1~                  Partial Surveillance Performed By   (Print/Sign)                                       I         Date               17               [iJ    Yes      DNo Accepted By     (Print/Sign)                                                   Date                                 Acceptance Criteria Satisfied Approved By (Department Head or Designee)                                     Date                                 OYes            DNo Surveillance Information I Test Equipment Type                                               QA Number                 Cal Due Date Vi' ,. ;,,, An,:ilvzer                                                   (Vt r..-d"?,l/Y1                       tf-/3 o/J7 A,.,.,,let "   ~                                                      Ml&#xa3; -/J;.'11..( (                       .'/17 1
' I.. ''Al.' SW Pump and Facility 1 Discharge Check Valve IST Installation of Temp Flow Meter (Step 4.1.1 a.) SM approval to INSTALL temporary flow meter: lv'4 11,,.,,.. , SM signature A/11 <1. Date A//f. 11.A -Step Action Performer l.V. 4.1.lb. PDM to install temporary flow meter on service water v? strainer backwash piping Perform IV for installation of temporary flow meter on 4.1.lc. service water backwash piping 2-SW-90A, "'A' SERVICE WATER PUMP STRAINER FLUSH," Stroke and Timing Step Parameter Limits Minimum Data (sec) Maximum 2-SW-90A ''Acceptable" NIA 14.72 open stroke time "Normal" 3.68 7"')5 11.04 Baseline=
Water Level Indicator                                                       NO#           <Y'Jr75 (""""         7)1r/17 Stoowatch                                                             }/\le:- '* ,tJ 52..t.b               '8'/3;/; 7 Stopwatch Temporary Flow Meter                                                           .'11\ n:: -it. 3 '61               7/i-1    In I Comments I CR#
7.36 sec 4.l.5f./h.
NOTE: Following acceptance, copy FORWARDED to IST Coordinator.                                      D Initial SP 2612A-003 Rev. 008 Page 1of6
2-SW-90A ''Acceptable" NIA NIA close stroke time '-/. "i 3 (Augmented) "Normal" NIA NIA Step Parameter IST Acceptance Criteria Results Initials 2-SW-90A Within IST "Normal" limits 4J--stroke times "UNS.A: ' 4.l.5j./k.
 
2-SW-90A The following are met: Operational
' I..
* Stroke times within "SAT" Readiness IST ''Acceptable" limits "UNSAT" D
                    ''Al.' SW Pump and Facility 1 Discharge Check Valve IST Installation of Temp Flow Meter (Step 4.1.1 a.)
* Valve completed one full cycle 2-SW-1A, "'A' SERVICE WATER PUMP DISCHARGE CHECK," Open Check Step No. Parameter 4.l.9a. Service Water Header ''}!('flow Parameter 4.l.9b. 2-SW-lA Open Check Indicator IST Acceptance Criteria Minimum FIT-6471 10,300 IST Acceptance Criteria SW Header ''}!(' flow within IST ''Acceptance Criteria" Data (gpm) Maximum tf/, c; r>1>' Results "SAT" @' "UNSAT" D SP 2612A-003 Rev. 008 Page 2 of 6 10,700 Initials 9--
SM approval to INSTALL temporary flow meter:
'W' SW Pump and Facility 1 Discharge Check Valve IST "I(' SW Pump Vibration Level Data Step Parameter IST Acceptance Criteria Vibration Measurement Acceptable Limits Data (in/sec) Normal Limits Point MOH Baseline=  
lv'4     11,,.,,..
.102 <0.612 t5 /'}.. > <0.255 MOV Baseline=  
                                                                    ~
.134 <0.700 0J1'6&#xa3;, <0.325 MOA Baseline=  
SM signature Step A/11 Action
.055 <0.330 i,0c;t <0.137 4.1.lla. MIH Augmented  
                                                    <1.       ~            Date     A//f. 11.A Performer
<0.420 fe:,. I&#xa2;/ 2 NIA MIV Augmented  
                                                                                                      - l.V.
<0.330 Jl') , {lf' i NIA MIA Augmented  
4.1.lb.
<0.234 f!5. d? t/ NIA "I(' SW Pump Discharge Pressure Step Parameter Indicator Data (psig) 4.1.llc.l)
PDM to install temporary flow meter on service water strainer backwash piping
Discharge pressure PI-6474 (local) 38-.; ''N' SW Header Flow Step Parameter Indicator IST Acceptance Criteria Minimum Data (gpm) Maximum Service Water Header "Pl' FIT-6471 /0/ <.:; b 0 flow 4.1. llc.2)1 Temp Flow Meter at 0 3) strainer backwash piping Total Flow 10,300 10 '5-ou I 10,700 Item IST Acceptance Criteria Results Initials 4.1.llc. SW Header ''PC flow Meets IST Acceptance "SAT" YL-Criteria "UNSAT" 0 Intake Structure Level and "I(' SW Pump Suction Pressure Calculation Step Parameter Distance from floor to Circ Water Bay level 4.l.12b./e.
                                                                                        ~
Sea level (Sea level= 14 -Distance from floor to water level) 4.1.14 Suction pressure Note 1. Suction pressure (psig) =Sea level x 0.45 Indicator Data (ft) Level Indicator 3 Calculated / . .>7 Indicator Data (psig) Calculated
                                                                                              ~vA- v? '~
: o. 11 (Note 1.) SP 2612A-003 Rev. 008 Page 3 of 6
4.1.lc.
'W.' SW Pump and Facility 1 Discharge Check Valve IST "Ii.' SW Pump AP Step Parameter Limits IST Acceptance Criteria Min Data (psid) Max ''N..' SW Pump ''Acceptable" 40.97 3 7 .. 'I 48.45 4.l.15b. Baseline = 44.05 psid (Note 2.) "Normal" 41.85 NIA Note 2. LJP (psid) =Discharge  
Perform IV for installation of temporary flow meter on service water backwash piping
-Suction Pressure Step 4.1.16 Step 4.1.17 Step 4.1.18 Item Results Initials ''N..' SW Pump is within IST ''Acceptable" limits "SAT" D "UNSAT" //t-.-"SAT" D ''N..' SW Pump is within IST "Normal" limits ,.., . ., "UNSAT" lkl ( ' ,p/&#xa5;;;...,-z._-.,-SW Pump Vibration Level Data Item Data Initials All ''N..' SW Pump vibration data is within "SAT" IST ''Acceptable" limits "UNSAT" D 0** All ''N..' SW Pump vibration data is within "SAT" rig IST "Normal" limits "UNSAT" D SW Pump Operational Readiness Parameter IST Acceptance Data Criteria All within IST "Acceptable" limits: ''N..' SW Pump * ''N..' SW Pump "SAT" [I Operational
                                                                                            ~
* SW Header ''N..' "UNSAT" }4 Readiness total flow * ''N..' SW Pump vibration ( r Initials <..<?--SP 2612A-003 Rev. 008 Page 4 of 6
2-SW-90A, "'A' SERVICE WATER PUMP STRAINER FLUSH," Stroke and Timing Step       Parameter                     Limits               Minimum     Data (sec)       Maximum 2-SW-90A                   ''Acceptable"               NIA                           14.72 open stroke time                                                       7"')5 Baseline= 7.36 sec            "Normal"                 3.68                           11.04 4.l.5f./h.
. ' ' 'W' SW Pump and Facility 1 Discharge Check Valve IST 2-SW-18, "'B' SERVICE WATER PUMP DISCHARGE CHECK," Closure Check Step Parameter IST Acceptable Limit Results Initials "SA'l"' "B" SW Pump No reverse rotation observed 4.1.23 All within IST '1\cceptable" limits: d./e. 2-SW-lB closed * 'W..' SW Pump " 0 NJ " N .T" n '9---* "B" SW Pump reverse rotation -"Ii' SW Pump Reverse Rotation Check Step Parameter IST Acceptable Limit Results Initials "SAT"
2-SW-90A                   ''Acceptable"               NIA                             NIA close stroke time                                                     '-/. "i 3 (Augmented)                   "Normal"                 NIA                             NIA Step       Parameter                   IST Acceptance Criteria               Results           Initials 2-SW-90A Within IST "Normal" limits           "SAT"~              4J--
***-4.1.26 ''}(' SW Pump No sustained reverse rotation observed <._?.....-"U ,, n .-4-"B" SW Pump Discharge Pressure Step Parameter Indicator Data (psig) 4.1.28c.l)
stroke times                                                   "UNS.A: '
Discharge pressure PI-6480 (local) #If Qi.-2-SW-18, "'B' SERVICE WATER PUMP DISCHARGE CHECK," Open Check Step Parameter Indicator IST Acceptance Criteria Min Data (gpm) 4.1.28c.2)
4.l.5j./k.                         The following are met:
Service Water Header FIT-6471 10,300 Nf a ''}('flow
2-SW-90A
._.....__
* Stroke times within Operational                                                    "SAT"       ~
Item IST Acceptance Criteria Results 4.1.28d. 2-SW-lB Open Check SW Header 'W..' flow within IST '1\cceptance Criteria" "U ,, Intake Structure Level and "B" SW Pump Suction Pressure Calculation Step Parameter Distance from floor to Circ Water Bay level 4.1.29b./d.
Readiness IST ''Acceptable" limits
Sea level (Sea level = 14 -Distance from floor to water level) 4.1.31 Suction pressure Note 3. Suction pressure (psig) = Sea level x 0.45 Indicator Level Indicator Calculated Indicator Calculated (Note 3.) SP 2612A-003 Rev. 008 Page 5 of 6 Max 10,700 Initials ti/Jr 0-Data (ft) ;v4 /1--;vJr ,ry-Data (psig) NA-,,,,,_.
* Valve completed one full cycle "UNSAT" D            ~
'W' SW Pump and Facility 1 Discharge Check Valve IST "B" SW Pump AP Step Parameter Limits IST Acceptance Criteria Minimum Data (psid) 4.l.32b. "B" SW Pump i1P (Note 4.)
2-SW-1A, "'A' SERVICE WATER PUMP DISCHARGE CHECK," Open Check IST Acceptance Criteria Step No.             Parameter                     Indicator Minimum    Data (gpm)      Maximum Service Water Header 4.l.9a.             ''}!('flow                   FIT-6471         10,300       tf/, c;r>1>'    10,700 Parameter                  IST Acceptance Criteria           Results        Initials 4.l.9b.                                      SW Header ''}!(' flow within   "SAT"          @'
38.6 ,/\/A-, .4-" Note 4. LJP (psid) = Discharge  
2-SW-lA Open Check IST ''Acceptance Criteria"   "UNSAT" D          9--
-Suction Pressure Step Item IST Acceptance Criteria Results Initials 4.1.33 "B" SW Pump i1P Within IST Ej limits 2-SW-1A, "'A' SERVICE WATER PUMP DISCHARGE CHECK," Closure Check Step Parameter IST Acceptance Criteria Results Initials 2-SW-lA All within IST limits: t-rA-4.1.34 Closure Check * 'W' SW Pump reverse rotation "U " Yv * "B" SW Pump i1P 2-SW-18, "'B' SERVICE WATER PUMP DISCHARGE CHECK," Closure Check Step Parameter IST Acceptable Limit Results Initials "S-M" tJA <iv "B" SW Pump No reverse rotation observed 4.1.36 All within IST limits:
SP 2612A-003 Rev. 008 Page 2 of 6
i./j. "S tJA-2-SW-lB closed * "JC SW Pump i1P ,, D " SAT" 0-* "B" SW Pump reverse rotation SW Pump Strainer Control Restoration Step Parameter Performer l.V. 'W' SW Pump Strainer switch returned to 4.1.39 AJfi-J}UA /J,,, / "B" SW Pump Strainer switch returned to Removal of Temp Flow Meter (Step 4.1.40a.)
 
SM approval to REMOVE temporary flow meter: SM signature Date Step Action Performer l.V. PDM to remove temporary flow meter on service 4.l.40b. water strainer backwash piping 4.l.40c. Perform IV for removal of temporary flow meter on service water backwash piping ...--*""' ( SP 2612A-003 Rev. 008 Page 6 of 6 JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: Review RWP and Survey Map JPMNumber:
                  'W' SW Pump and Facility 1 Discharge Check Valve IST "I(' SW Pump Vibration Level Data Step           Parameter                               IST Acceptance Criteria Vibration Measurement           Acceptable Limits         Data (in/sec)             Normal Limits Point MOH Baseline= .102             <0.612               t5 ~ /'}.. >               <0.255 MOV Baseline= .134             <0.700               0J1'6&#xa3;,                     <0.325 MOA Baseline= .055             <0.330               rzs~  i,0c;t               <0.137 4.1.lla.
JPM-A3R Revision:
MIH Augmented                 <0.420               fe:,. I&#xa2;/ 2                 NIA MIV Augmented                 <0.330               Jl') , {lf' i                 NIA MIA Augmented                 <0.234               f!5. d? t/                   NIA "I(' SW Pump Discharge Pressure Step             Parameter                               Indicator                           Data (psig) 4.1.llc.l)       Discharge pressure                       PI-6474 (local)                           38-.;
0 Initiated:
                                          ''N' SW Header Flow IST Acceptance Criteria Step               Parameter                   Indicator Minimum           Data (gpm)     Maximum Service Water Header "Pl' FIT-6471                         /0/ <.:; b 0 flow 4.1. llc.2)1     Temp Flow Meter at
John W. Riley (Signature on File) 1/23/17 Developer Date Reviewed:
: 3)       strainer backwash piping                                               0 Total Flow                                   10,300           10 I '5-ou         10,700 Item                 IST Acceptance Criteria               Results         Initials 4.1.llc.                                         Meets IST Acceptance            "SAT" ~*
Will Chesnutt (Signature on File) 1127/17 Technical Reviewer Date Approved:
SW Header ''PC flow Criteria                 "UNSAT" 0           YL-Intake Structure Level and       "I(' SW Pump Suction Pressure Calculation Step                               Parameter                                 Indicator          Data (ft)
Michael John Cote (Signature on File) 1/26/17 Supervisor, Nuclear Training Date 1
Distance from floor to Circ Water Bay level               Level Indicator      i,~.Lf  3 4.l.12b./e. Sea level (Sea level= 14 - Distance from floor to water level)
Calculated          / . .>7 Indicator        Data (psig) 4.1.14                         Suction pressure                             Calculated (Note 1.)        o. 11 Note 1. Suction pressure (psig) =Sea level x 0.45 SP 2612A-003 Rev. 008 Page 3 of 6
 
                  'W.' SW Pump and Facility 1 Discharge Check Valve IST "Ii.' SW Pump AP IST Acceptance Criteria Step                     Parameter                             Limits Min       Data (psid)           Max
                      ''N..' SW Pump ~p                        ''Acceptable"   40.97                           48.45 4.l.15b.               Baseline = 44.05 psid 3 7.  'I (Note 2.)                         "Normal"       41.85                           NIA Note 2. LJP (psid) =Discharge - Suction Pressure Step                                               Item                                    Results          Initials "SAT"        D
              ''N..' SW Pump ~p is within IST ''Acceptable" limits                                             //t-.-
                                                                                        "UNSAT" ~              ~,,
4.1.16 "SAT"        D           ,.., ..,
                  ''N..' SW Pump ~p is within IST "Normal" limits                                               ( '
                                                                                        "UNSAT" lkl           ,p/&#xa5;;;...,-z._-.,-
                                        *~*  SW Pump Vibration Level Data Step                                    Item                                   Data                 Initials All ''N..' SW Pump vibration data is within                     "SAT"     ~
IST ''Acceptable" limits                         "UNSAT" D               0**
4.1.17 All ''N..' SW Pump vibration data is within IST "Normal" limits "SAT" "UNSAT" D rig
(
r
                                    *~*  SW Pump Operational Readiness IST Acceptance Step            Parameter                                                      Data                 Initials Criteria All within IST "Acceptable" limits:
                ''N..' SW Pump                 * ''N..' SW Pump ~p Operational
* SW Header ''N..'
                                                                            "SAT"      [I            <..<?--
4.1.18 "UNSAT" }4 Readiness                 total flow
                                              * ''N..' SW Pump vibration SP 2612A-003 Rev. 008 Page 4 of 6
 
                      'W' SW Pump and Facility 1 Discharge Check Valve IST 2-SW-18, "'B' SERVICE WATER PUMP DISCHARGE CHECK," Closure Check Step           Parameter                       IST Acceptable Limit               Results         Initials "SA'l"'
4.1.23 "B" SW Pump                   No reverse rotation observed "UN~A?o              tV/f-~
:~
d./e.                               All within IST '1\cceptable" limits:
2-SW-lB closed             * 'W..' SW Pump ~p                          "               0     NJ '9---
                                          * "B" SW Pump reverse rotation
                                                                                      " N    .T"    n-
                                    "Ii' SW Pump Reverse Rotation Check Step           Parameter                       IST Acceptable Limit               Results           Initials 4.1.26       ''}(' SW Pump         No sustained reverse rotation observed "SAT" ~TIT <._?.....-   ***-
                                                                                      "U       ,, n           .                                         "B" SW Pump Discharge Pressure Step             Parameter                                 Indicator                       Data (psig) 4.1.28c.l)       Discharge pressure                           PI-6480 (local)                       #If   Qi.-
2-SW-18, "'B' SERVICE WATER PUMP DISCHARGE CHECK," Open Check IST Acceptance Criteria Step             Parameter                     Indicator Min       Data (gpm)             Max Service Water Header 4.1.28c.2)               ''}('flow                    FIT-6471         10,300       Nf a._.....__     10,700 Item                   IST Acceptance Criteria         Results           Initials 4.1.28d.
2-SW-lB Open Check SW Header 'W..' flow within IST '1\cceptance Criteria" "S~
                                                                                      "U       ,,
ti/Jr 0-Intake Structure Level and "B" SW Pump Suction Pressure Calculation Step                               Parameter                               Indicator            Data (ft)
Distance from floor to Circ Water Bay level               Level Indicator          ;v4 /1--
4.1.29b./d.     Sea level (Sea level = 14 - Distance from floor to Calculated            ;vJr ,ry-water level)
Data Indicator 4.1.31                           Suction pressure                                                   (psig)
Calculated (Note 3.)        NA-,,,,,_.
Note 3. Suction pressure (psig) = Sea level x 0.45 SP 2612A-003 Rev. 008 Page 5 of 6
 
                    'W' SW Pump and Facility 1 Discharge Check Valve IST "B" SW Pump AP IST Acceptance Criteria Step                Parameter                    Limits Minimum          Data (psid) 4.l.32b.       "B" SW Pump i1P (Note 4.)         '~cceptable"      38.6             ,/\/A-
                                                                                            ,   .4-"
Note 4. LJP (psid) = Discharge - Suction Pressure Step                     Item                 IST Acceptance Criteria       Results           Initials Within IST '~cceptable"   "S~l"iu\)'. Ej 4.1.33            "B" SW Pump i1P limits           "U~il"W                Alf~
2-SW-1A, "'A' SERVICE WATER PUMP DISCHARGE CHECK," Closure Check Step         Parameter                 IST Acceptance Criteria               Results           Initials All within IST '~cceptable" limits:
4.1.34 2-SW-lA Closure Check
                                  * 'W' SW Pump reverse rotation             "S~
                                                                              "U         "
t-rA-Yv
                                  * "B" SW Pump i1P 2-SW-18, "'B' SERVICE WATER PUMP DISCHARGE CHECK," Closure Check Step             Parameter                     IST Acceptable Limit             Results           Initials "B" SW Pump                 No reverse rotation observed       "UNSAT.~>*-~ tJA <iv "S-M" 4.1.36                                                                             ..-<v~
i./j.                               All within IST '~cceptable" limits:            ,,      D        tJA-
                                                                                "S 2-SW-lB closed           * "JC SW Pump i1P                                                     ~
                                                                                "   SAT" 0-
                                      * "B" SW Pump reverse rotation SW Pump Strainer Control Restoration Step                                     Parameter                             Performer             l.V.
                    'W' SW Pump Strainer switch returned to       '~UTO" 4.1.39 "B" SW Pump Strainer switch returned to        '~UTO"              AJfi- ~ J}UA         /J,,, /
Removal of Temp Flow Meter (Step 4.1.40a.)
SM approval to REMOVE temporary flow meter:
SM signature                                 Date Step                                   Action                           Performer               l.V.
                                                                                  -~
PDM to remove temporary flow meter on service                                 ...--*""'
4.l.40b.
water strainer backwash piping                           l~ ~*~-
4.l.40c.
Perform IV for removal of temporary flow meter on                 (
service water backwash piping SP 2612A-003 Rev. 008 Page 6 of 6
 
JOB PERFORMANCE MEASURE APPROVAL SHEET JPM
 
==Title:==
Review RWP and Survey Map JPMNumber:     JPM-A3R                           Revision:       0 Initiated:
John W. Riley (Signature on File)             1/23/17 Developer                           Date Reviewed:
Will Chesnutt (Signature on File)             1127/17 Technical Reviewer                       Date Approved:
Michael John Cote (Signature on File)           1/26/17 Supervisor, Nuclear Training                 Date 1


==SUMMARY==
==SUMMARY==
OF CHANGES DATE DESCRIPTION REV/CHANGE 1111/2017 New JPM for 2017 NRC JPM exam re-take. Similar JPMs are in 0 the bank but task (vent a pump) and area have been changed. 2 JPM WORKSHEET Facility:
OF CHANGES DATE                           DESCRIPTION                       REV/CHANGE 1111/2017 New JPM for 2017 NRC JPM exam re-take. Similar JPMs are in       0 the bank but task (vent a pump) and area have been changed.
MP2 Examinee:
2
JPMNumber:
 
JPM-A3R Revision:
JPM WORKSHEET Facility:     MP2                           Examinee:
0 Task Title: Review RWP and Survey Map System: Radiation Control Time Critical Task: DYES [ZI NO Validated Time (minutes):
JPMNumber:                       JPM-A3R                               Revision:       0 Task
15 Task Number(s):
 
Applicable To: SRO x STA RO x PEO KIA Number: 2.3.7 KIA Rating: 3.5 I 3.6 Method of Testing: Simulated Performance:
==Title:==
Actual Performance:
Review RWP and Survey Map System:             Radiation Control Time Critical Task:                   DYES       [ZI NO Validated Time (minutes):               15 Task Number(s):
x Location:
Applicable To:               SRO       x         STA                     RO     x           PEO KIA Number:                   2.3.7               KIA Rating:           3.5 I 3.6 Method of Testing:         Simulated Performance:                                   Actual Performance:           x Location:                   Classroom:         x               Simulator:                         In-Plant:
Classroom:
Task Standards:                 At the completion of this JPM the examinee has reviewed the applicable RWP and survey map to determine the specified radiological requirements to perform the assigned task.
x Simulator:
Required Materials:             RWP 2170002 (procedures, equipment, etc.)   Millstone Nuclear Power Station - Radiation Survey Figure No. 27 Unit 2, -45 Safeguards, Aerated Waste Tank and Pump Rooms.
In-Plant:
General  
Task Standards:
Required Materials: (procedures, equipment, etc.) General  


==References:==
==References:==
MP-PROC-HP-RPM 5.2.2[r016] Basic Radiation Worker Responsibilities
                                        *** READ TO THE EXAMINEE ***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
3


At the completion of this JPM the examinee has reviewed the applicable RWP and survey map to determine the specified radiological requirements to perform the assigned task. RWP 2170002 Millstone Nuclear Power Station -Radiation Survey Figure No. 27 Unit 2, -45 Safeguards, Aerated Waste Tank and Pump Rooms. MP-PROC-HP-RPM 5.2.2[r016]
JPM WORKSHEET JPMNumber:                   JPM-A3R                         Revision:         0 Initial Conditions:
Basic Radiation Worker Responsibilities
* The plant is in MODE 1 operating at 100% power.
*** READ TO THE EXAMINEE *** I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied.
With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
3 JPM WORKSHEET JPMNumber:
JPM-A3R Revision:
0 Initial Conditions:
* The plant is in MODE 1 operating at 100% power. Initiating Cues:
* Maintenance on the "A" CS pump has been completed.
* Maintenance on the "A" CS pump has been completed.
* All pump tagging has been removed with the exception of the pump breaker. The pump breaker remains racked down and RED TAGGED.
* All pump tagging has been removed with the exception of the pump breaker. The pump breaker remains racked down and RED TAGGED.
* The suction, discharge, recirculation, vent and drain valves are all closed in preparation for filling and venting of the pump.
* The suction, discharge, recirculation, vent and drain valves are all closed in preparation for filling and venting of the pump.
Initiating Cues:
* You have been directed to fill and vent the "A" CS pump (P43A). The pump casing vent only needs to be vented and this vent is reached without climbing.
* You have been directed to fill and vent the "A" CS pump (P43A). The pump casing vent only needs to be vented and this vent is reached without climbing.
* Hoses need to be installed for venting.
* Hoses need to be installed for venting.
* The duration of filling and venting the "A" CS pump (P43A) is expected to take half an hour.
* The duration of filling and venting the "A" CS pump (P43A) is expected to take half an hour.
* All radiological protective action for this work is contained in the RWP. There are no additional radiological protective action requirements in the Operating procedure for filling and venting the pump.
* All radiological protective action for this work is contained in the RWP.
* State the radiological requirements for entering this area. Include in your answer: 1. WhichRWP task (job step) is appropriate for this assignment.
There are no additional radiological protective action requirements in the Operating procedure for filling and venting the pump.
* State the radiological requirements for entering this area. Include in your answer:
: 1. WhichRWP task (job step) is appropriate for this assignment.
: 2. Highest radiation level in the work area around the pump (including units of measure).
: 2. Highest radiation level in the work area around the pump (including units of measure).
: 3. Highest contamination level in the area of the pump (including units of measure).
: 3. Highest contamination level in the area of the pump (including units of measure).
: 4. Protective clothing required to perform venting operations.
: 4. Protective clothing required to perform venting operations.
: 5. Expected dose for this assignment area for you only (including units of measure) 6. Dose rate alarm (including units of measure) The examiner will act as Health Physics (HP) for any related questions.
: 5. Expected dose for this assignment area for you only (including units of measure)
Simulator Requirements:
: 6. Dose rate alarm (including units of measure)
NI A ****NOTES TO TASK PERFORMANCE EVALUATOR****
The examiner will act as Health Physics (HP) for any related questions.
Simulator Requirements:       NIA
                  ****NOTES TO TASK PERFORMANCE EVALUATOR****
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question stl,ldent for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). 4 PERFORMANCE INFORMATION JPM Number: JPM-A3R Revision:
: 3. If necessary, question stl,ldent for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
0 Task Title: Review RWP and Survey Map START TIME: ----STEP Performance:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Standard:
4
Critical:
 
Grade #1 Examinee reviews RWP 2170002, Nuclear Station so uo Review R WP 2170002, Nuclear Station Operations and Maintenance Radiation Work Operations and Maintenance Radiation Work Permit (RWP). Permit (RWP). Examinee reviews Millstone Nuclear Power Review Millstone Nuclear Power Station -Station -Radiation Survey Figure No. 27 Unit 2, -Radiation Survey Figure No. 27 Unit 2, -45 45 Safeguards, Aerated Waste Tank and Pump Safeguards, Aerated Waste Tank and Pump Rooms. Rooms. Cue:
PERFORMANCE INFORMATION JPM Number:         JPM-A3R                                                       Revision:     0 Task
 
==Title:==
Review RWP and Survey Map START TIME: - - - -
STEP Performance:                                   Standard:                                             Critical:       Grade
#1                                                 Examinee reviews RWP 2170002, Nuclear Station       YON~          so uo Review R WP 2170002, Nuclear Station           Operations and Maintenance Radiation Work Operations and Maintenance Radiation Work     Permit (RWP).
Permit (RWP).
Examinee reviews Millstone Nuclear Power Review Millstone Nuclear Power Station -       Station - Radiation Survey Figure No. 27 Unit 2, -
Radiation Survey Figure No. 27 Unit 2, -45     45 Safeguards, Aerated Waste Tank and Pump Safeguards, Aerated Waste Tank and Pump       Rooms.
Rooms.
Cue:
* Provide examinee with RWP 2170002, Nuclear Station Operations and Maintenance Radiation Work Permit.
* Provide examinee with RWP 2170002, Nuclear Station Operations and Maintenance Radiation Work Permit.
* Provide examinee Millstone Nuclear Power Station-Radiation Survey Figure No. 27 Unit 2, -45 Safeguards, Aerated Waste Tank and Pump Rooms
* Provide examinee Millstone Nuclear Power Station-Radiation Survey Figure No. 27 Unit 2, -45 Safeguards, Aerated Waste Tank and Pump Rooms
* Provide a calculator . Comments:
* Provide a calculator.
STEP Performance:
Comments:
Standard:
STEP Performance:                                   Standard:                                             Critical:       Grade
Critical:
#2     1. Determine which RWP task Gob step) is   Examinee states that task Gob step) No. 1 is         Y~NO          so uo appropriate for this assignment.       appropriate for this task. Task #1 is Operations:
Grade #2 1. Determine which RWP task Gob step) is Examinee states that task Gob step) No. 1 is so uo appropriate for this assignment.
appropriate for this task. Task #1 is Operations:
Perform routine work activities in RCAs and Radiation Areas: routine surveillance, rounds, system operation and restoration, tagging, walk downs and inspections.
Perform routine work activities in RCAs and Radiation Areas: routine surveillance, rounds, system operation and restoration, tagging, walk downs and inspections.
Cue: Comments:
Cue:
5 PERFORMANCE INFORMATION JPMNumber:
Comments:
JPM-A3R Revision:
5
0 Task Title: Review RWP and Survey Map STEP Performance:
 
Standard:
PERFORMANCE INFORMATION JPMNumber:         JPM-A3R                                                             Revision:     0 Task
Critical:
 
Grade #3 2. Determine the highest radiation level in Examinee states that highest radiation level in the Y[g] NO so uo the area around the "A" CS pump area around the "A" CS pump (P43A) is 5 mrem/hr (P43A) (including units of measure).
==Title:==
(2.4 mrem/hr to 5 mrem/hr is acceptable)
Review RWP and Survey Map STEP Performance:                                         Standard:                                             Critical:       Grade
Cue: Comments:
#3     2. Determine the highest radiation level in     Examinee states that highest radiation level in the Y[g] NO         so uo the area around the "A" CS pump             area around the "A" CS pump (P43A) is 5 mrem/hr (P43A) (including units of measure).         (2.4 mrem/hr to 5 mrem/hr is acceptable)
Note mr/hr is the same as mrem/hr STEP Performance:
Cue:
Standard:
Comments: Note mr/hr is the same as mrem/hr STEP Performance:                                         Standard:                                             Critical:       Grade
Critical:
#4     3. Determine the highest contamination           Examinee states that the contamination level in the Y[g] NO         so uo level in the area around the "A" CS         area around the "A" CS pump (P43A) area is 2
Grade #4 3. Determine the highest contamination Examinee states that the contamination level in the Y[g] NO so uo level in the area around the "A" CS area around the "A" CS pump (P43A) area is pump (P43A) (including units of < lk DPM/100 cm 2 measure).
pump (P43A) (including units of             < lk DPM/100 cm measure).
Cue: Comments:
Cue:
STEP Performance:
Comments:
Standard:
STEP Performance:                                         Standard:                                             Critical:       Grade
Critical:
#5     4. Determine the minimum protective             Examinee states that as a minimum lab coats and     Y[g] NO         so uo clothing required for hooking up hoses to   rubber gloves shall be worn when hoses are be used for the venting.                     connected to contaminated systems.
Grade #5 4. Determine the minimum protective Examinee states that as a minimum lab coats and Y[g] NO so uo clothing required for hooking up hoses to rubber gloves shall be worn when hoses are be used for the venting. connected to contaminated systems. Cue: Comments:
Cue:
Reference page 4 of Job Step 1, specifies 7.3 ofRWP 2170002. It is acceptable if the examinee includes shoe covers since HP might specify this requirement in the brief. STEP Performance:
Comments:
Standard:
Reference page 4 of Job Step 1, specifies 7.3 ofRWP 2170002. It is acceptable if the examinee includes shoe covers since HP might specify this requirement in the brief.
Critical:
STEP Performance:                                         Standard:                                             Critical:       Grade
Grade #6 5. Determine the expected dose for this Examinee states that the expected dose is between Y[g] NO so uo assignment, (including units of measure).
#6     5. Determine   the expected dose for this     Examinee   states that the expected dose is between Y[g]   NO       so uo assignment, (including units of measure). 1.2 to 2.5 mrem.
1.2 to 2.5 mrem. Cue: Comments:
Cue:
The exarninee could estimate high (conservative) using 5 mrem/hr Dose Rate X 1/2 hr = 2.5 mrem, or could use what appears to be the closes radiation reading to the pump 2.4 mrem/hr which would be 2.4 mrem/hr X 1/2 hr= 1.2 mrem Note mr is the same as mrem 6 PERFORMANCE INFORMATION JPMNumber:
Comments:
JPM-A3R Revision:
The exarninee could estimate high (conservative) using 5 mrem/hr Dose Rate X 1/2 hr = 2.5 mrem, or could use what appears to be the closes radiation reading to the pump 2.4 mrem/hr which would be 2.4 mrem/hr X 1/2 hr= 1.2 mrem Note mr is the same as mrem 6
0 Task Title: Review RWP and Survey Map STEP Performance:
 
Standard:
PERFORMANCE INFORMATION JPMNumber:       JPM-A3R                                                         Revision:     0 Task
Critical:
 
Grade #7 6. Determine the expected dose rate alarm Examinee states that the dose rate alarm is 20 so uo for this assignment, (including units of mrem/hr. measure).
==Title:==
Cue: Comments:
Review RWP and Survey Map STEP Performance:                                   Standard:                                           Critical:   Grade
Note mr/hr is the same as mrem/hr TERMINATION CUE: The evaluation for this JPM is concluded.
#7     6. Determine the expected dose rate alarm   Examinee states that the dose rate alarm is 20     Y~ND      so uo for this assignment, (including units of mrem/hr.
STOP TIME: ---7 PERFORMANCE INFORMATION JPM Number: JPM-A3R Revision:
measure).
0 Task Title: Review RWP and Survey Map Task #1 is Operations:
Cue:
Perform routine work activities in RCAs 1. RWP Task and Radiation Areas: routine surveillance, rounds, system operation and restoration, tagging, walk downs and inspections.
Comments: Note mr/hr is the same as mrem/hr TERMINATION CUE: The evaluation for this JPM is concluded.
: 2. Highest Radation level in 5 mrem/hr (2.4 to 5 mrem/hr is acceptable) pump area (units of measure) 3. Highest contamination Contamination level in the area around the "A" CS pump (P43A) level in the pump area area is < lk DPM/100 cm 2 (units of measure) 4. Minimum required PCs Minimum lab coats and rubber gloves shall be worn when hoses are connected to contaminated systems. Including shoe covers to vent would be acceptable.
STOP TIME: - - -
: 5. Expected Dose (units of Expected dose is between 1.2 to 2.5 mrem. measure) 6. Dose Rate Alarm Setting Dose Rate Alarm is 20 mrem/hr. (units of measure)s 8
7
VERIFICATION OF JPM COMPLETION JPMNumber:
 
JPM-A3R Revision:
PERFORMANCE INFORMATION JPM Number:         JPM-A3R                                                 Revision:       0 Task
0 Date Performed:
 
Student: For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
==Title:==
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. EVALUATION SECTION: Time Critical Task? D Yes Validated Time (minutes):
Review RWP and Survey Map Task #1 is Operations: Perform routine work activities in RCAs
I 15 Actual Time to Complete (minutes):
: 1. RWP Task                   and Radiation Areas: routine surveillance, rounds, system operation and restoration, tagging, walk downs and inspections.
I Work Practice Performance:
: 2. Highest Radation level in 5 mrem/hr (2.4 to 5 mrem/hr is acceptable) pump area (units of measure)
D SAT D UNSAT Operator Fundamentals:
: 3. Highest contamination     Contamination level in the area around the "A" CS pump (P43A) level in the pump area   area is < lk DPM/100 cm2 (units of measure)
D SAT D UNSAT JPM Question Portion Overall [.NLO only]: D SAT D UNSAT D N/A Attached Question #1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:
Minimum lab coats and rubber gloves shall be worn when hoses
: 4. Minimum required PCs are connected to contaminated systems. Including shoe covers to vent would be acceptable.
: 5. Expected Dose (units of   Expected dose is between 1.2 to 2.5 mrem.
measure)
: 6. Dose Rate Alarm Setting   Dose Rate Alarm is 20 mrem/hr.
(units of measure)s 8
 
VERIFICATION OF JPM COMPLETION JPMNumber:                             JPM-A3R                                       Revision:           0 Date Performed:
Student:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
EVALUATION SECTION:
Time Critical Task?                                 D   Yes ~No Validated Time (minutes):
I     15         Actual Time to Complete (minutes):
I Work Practice Performance:                         D   SAT             D UNSAT Operator Fundamentals:                             D   SAT             D UNSAT JPM Question Portion Overall [.NLO only]:           D   SAT             D UNSAT               D   N/A Attached Question #1       D   SAT             D UNSAT Attached Question #2       D   SAT             D UNSAT Overall Result of JPM:                             D   SAT             D UNSAT Evaluator:
Print I Sign Areas for Improvement I Comments:
Print I Sign Areas for Improvement I Comments:
9 JPMNumber:
9
hritial Conditions:
 
hritiating Cues: STUDENT HANDOUT (Page 1 of 2) JPM-A3R Revision:
STUDENT HANDOUT (Page 1 of 2)
0
JPMNumber:                    JPM-A3R                                 Revision:           0 hritial Conditions:
* The plant is in MODE I operating at 100% power.
* The plant is in MODE I operating at 100% power.
* Maintenance on the "A" CS pump has been completed.
* Maintenance on the "A" CS pump has been completed.
* All pump tagging has been removed with the exception of the pump breaker. The pump breaker remains racked down and RED TAGGED.
* All pump tagging has been removed with the exception of the pump breaker. The pump breaker remains racked down and RED TAGGED.
* The suction, discharge, recirculation, vent and drain valves are all closed in preparation for filling and venting of the pump.
* The suction, discharge, recirculation, vent and drain valves are all closed in preparation for filling and venting of the pump.
hritiating Cues:
* You have been directed to fill and vent the "A" CS pump (P43A). The pump casing vent only needs to be vented and this vent is reached without climbing.
* You have been directed to fill and vent the "A" CS pump (P43A). The pump casing vent only needs to be vented and this vent is reached without climbing.
* Hoses need to be installed for venting.
* Hoses need to be installed for venting.
* The duration of filling and venting the "A" CS pump (P43A) is expected to take half an hour.
* The duration of filling and venting the "A" CS pump (P43A) is expected to take half an hour.
* All radiological protective action for this work is contained in the RWP. There are no additional radiological protective action requirements in the Operating procedure for filling and venting the pump.
* All radiological protective action for this work is contained in the RWP.
* State the radiological requirements for entering this area. Include in your answer: 1. Which RWP task (job step) is appropriate for this assignment.
There are no additional radiological protective action requirements in the Operating procedure for filling and venting the pump.
* State the radiological requirements for entering this area. Include in your answer:
: 1. Which RWP task (job step) is appropriate for this assignment.
: 2. Highest radiation level in the work area around the pump (including units of measure).
: 2. Highest radiation level in the work area around the pump (including units of measure).
: 3. Highest contamination level in the area of the pump (including units of measure).
: 3. Highest contamination level in the area of the pump (including units of measure).
: 4. Protective clothing required to perform venting operations.
: 4. Protective clothing required to perform venting operations.
: 5. Expected dose for this assignment area for you only (including units of measure) 6. Dose rate alarm for this area (including units of measure) The examiner will act as Health Physics (HP) for any related questions.
: 5. Expected dose for this assignment area for you only (including units of measure)
10 STUDENT HANDOUT (Page 2 of2) JPMNumber:
: 6. Dose rate alarm for this area (including units of measure)
JPM-A3R Revision:
The examiner will act as Health Physics (HP) for any related questions.
0 1. RWPTask 2. Highest Radation level in the pump area (units of measure) 3. Highest contamination level in the pump area (units of measure) 4. Minimum required PCs to vent 5. Expected Dose (units of measure) 6. Dose Rate Alarm (units of measure) 11
10
' MILLSTONE NUCLEAR POWER STATION RADIATION SURVEY FIGURE NO. 27 UNIT 2 --* SURVE(BY *, \ -*-Survey Type Purpose Rad Material DATE 12/04/16 _. SIGNATURE  
 
*--**  
STUDENT HANDOUT (Page 2 of2)
--Contamination l&i Labeling & Radiation Routine Packaging SAT 1230 ....* G. Arends TIME PRINT NAME l&i Gamma l&i GA D Special INITIALS D Beta D LAS D RWPll REVIEWED BY I Mg 1.2 *7*/(-;, 'lo REACTOR 100 __J_ GWA IPMIT/S101UOATE)
JPMNumber:         JPM-A3R                               Revision: 0
(,\)<<!,.!/\ )J ;{I I'(!,\."--
: 1. RWPTask
POWER D Neutron 00 DRP Type Instrument Typel ) Serial Numller 1/Efficiency Bacl1ground Calibration Due Date y Tele 6611-140 N/A N/A 11/17 L-177 84679 10 80 cpm 06/17 a L-2241 I 43-2 234926 I 7496 6.5 O cpm 03/17 03/17 REASON FOR SURVEY: MONTHLY .,45 l!i R&#xa9;&#xa9;m Sl438 0.9;;;t P42B \!.;:I 3.5 0.5 &#xa9;1 2 1 2.5 7.5 X23B 2.6  
: 2. Highest Radation level in the pump area (units of measure)
@) Q ('} .QJ! .&sect; @) 0.3 Sl659 0 8 8 DD L16 X23A .4 D .4 b2 db Sl460 .QJ! '" -e @  2. @) O.B Resin Dewatering Panel =Nc:f> Smear Results NUMBER I DPM/100cm 2 1 -23 <1K ALPHA SMEARS NUMBER DPM/100 cm 2 a 3,6,12 <20 /f / y / Air Sample 0.0 %DAG IX! DRP Survey !Xl With LAS Masslin 0 With Tacky Roller With Microfiber O No DRP Detected !XI Noles: _______ _ RAD CONTROLLED AREA RAD MATERIAL AREA CONTAMINATED AREA RADIATION AREA HIGH RAD AREA LOCICEO HIGH RAO AREA VERY HIGH RAO AREA NEUTRON EXPOSURE AREA 1.QQ
: 3. Highest contamination level in the pump area (units of measure)
* gamma(y) at waist level in mremlhr 100* "gamma(y) contact in mremlhr 25 N -neutron(0 n 1) in mremlhr (j)'-DRP survey point (D-contamination survey point &sect;.Q p -beta (/3) reading in mrad/hr 250*110 HS* hot spot reading C) LAS -large area smear JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: Emergency Boration JPMNumber:
: 4. Minimum required PCs to vent
JPM-Sl (JPM-091)
: 5. Expected Dose (units of measure)
Revision:
: 6. Dose Rate Alarm (units of measure) 11
8/0 Initiated:
 
Robert L. Cimmino, Jr.(Signature on File) 01/23/2017 Developer Date Reviewed:
MILLSTONE NUCLEAR POWER STATION RADIATION SURVEY FIGURE NO. 27                                                                                                                 UNIT 2 SURVE(BY
Will Chesnutt (Signature on File) 01127/2017 Technical Reviewer Date Approved:
                                                                                                \
Michael John Cote (Signature on File) 01/26/2017 Supervisor, Nuclear Training Date I
                                                                                                      --* -*-                             Survey Type               Purpose         Rad Material DATE           12/04/16         SIGNATURE *-                       -**           -~*--        --                                                                             Labeling &
Radiation      Contamination   l&i Routine     Packaging SAT TIME            1230           PRINT NAME                                  G. Arends                                   l&i Gamma       l&i GA         D   Special IMg INITIALS D   Beta         D   LAS         D   RWPll
                                                                                                'lo REACTOR                                                       __J_
REVIEWED BY IPMIT/S101UOATE) s:r~o (,\)<<!,.!/\           )J ;{I I'(!,\."--
1.2 *7*/(-;,
POWER 100        D   Neutron     00 DRP                                 GWA Type             Instrument Typel )                     Serial Numller                       1/Efficiency                   Bacl1ground                 Calibration Due Date y                     Tele                               6611-140                               N/A                             N/A                             11/17
            ~+y                    L-177                                 84679                                 10                           80 cpm                           06/17 a           L-2241     I   43-2             234926         I     7496                       6.5                           O cpm                   03/17             03/17 REASON FOR SURVEY: MONTHLY
                      .,45   ~a~<eg!Ulairco1&sect;~ A<err&#xa9;l~co1 W&#xa9;l~~ l&#xa9;i!l1l~{                                                      l!i   IP!Ulm~0>        R&#xa9;&#xa9;m Sl438
                                                                                                                                                                    =Nc:f>
              ~
0.9     ;;;t P42B Smear Results
              \!.;:I         3.5
                                                                                                                            -    e NUMBER  I      DPM/100cm2 0.5                   &#xa9;1 2                                                                                                                           1 -23              <1K
          -~51406-'-                          2.5 7.5
                                                                                                            .4                            2.
1        2.6               X23B                    X23A D                                    @)
                                              @) ~o&sect;O Q   ('}
                                                                                                      .4
                                              .QJ!               .&sect;                                                                     O.B b2
                                                                                ~ ~,,
db
                                                                    @)
0.3 Sl659 Sl460
                                                                                      .QJ!
ALPHA SMEARS 0                                                                                      NUMBER     DPM/100 cm 2       a Resin              3,6,12               <20 Dewatering Panel                                            /f
                                                                                                                                                                                    /
                                                                                                                                                                            ~\~
y
                                                                                                                                                              /
Air Sample         0.0       %DAG IX!
8 DRP Survey                             !Xl With LAS Masslin                       0 With Tacky Roller                     ~
With Microfiber                       O No DRP Detected                       !XI 8
Noles: _ _ _ _ _ _ __
DD L16 RAD CONTROLLED AREA       RAD MATERIAL AREA     CONTAMINATED AREA             RADIATION AREA             HIGH RAD AREA     LOCICEO HIGH RAO AREA   VERY HIGH RAO AREA     NEUTRON EXPOSURE AREA 1.QQ
* gamma(y) at waist level in mremlhr                         100* "gamma(y) contact in mremlhr                     25 N -neutron(0n1) in mremlhr             (j)'-DRP survey point (D- contamination survey point                     &sect;.Q p - beta (/3) reading in mrad/hr                     250*110 HS* hot spot reading               C) LAS - large area smear
 
JOB PERFORMANCE MEASURE APPROVAL SHEET JPM
 
==Title:==
Emergency Boration JPMNumber:     JPM-Sl (JPM-091)                     Revision:       8/0 Initiated:
Robert L. Cimmino, Jr.(Signature on File)         01/23/2017 Developer                             Date Reviewed:
Will Chesnutt (Signature on File)             01127/2017 Technical Reviewer                         Date Approved:
Michael John Cote (Signature on File)           01/26/2017 Supervisor, Nuclear Training                   Date I


==SUMMARY==
==SUMMARY==
OF CHANGES A/l&DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format 711 01/09/2017 RLC Copied from JPM-091 and updated to latest procedure and format. 8/0 2 JPM WORKSHEET Facility:
OF CHANGES A/l&DATE                           DESCRIPTION                             REV/CHANGE 2006-317       Update JPM to include HUP evaluations and new format                 711 01/09/2017 RLC Copied from JPM-091 and updated to latest procedure and format.     8/0 2
MP-2 Examinee:
 
JPMNumber:
JPM WORKSHEET Facility:     MP-2                       Examinee:
JPM-Sl Revision:
JPMNumber:                       JPM-Sl                           Revision:   8/0 Task
8/0 Task Title: Emergency Boration System: Reactivity Control Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes):
 
15 TaskNumber(s):
==Title:==
NUTIMS # 000-04-099 Applicable To: SRO x RO x PEO ---------KIA Number: 004 A2.14 KIA Rating: 3.8/3.9 ----------------Method of Testing: Simulated Performance:
Emergency Boration System:           Reactivity Control Time Critical Task:                 ( ) YES     ( X ) NO Validated Time (minutes):               15 TaskNumber(s):                   NUTIMS # 000-04-099 Applicable To:               SRO - - x-         RO
Actual Performance:
                                                      -- x-     PEO - - -
x Location:
KIA Number:                                   KIA Rating:         3.8/3.9
Classroom:
                  - - -004  -- A2.14 Method of Testing:           Simulated Performance:                           Actual Performance:       x Location:                   Classroom:                       Simulator:     x             In-Plant:
Simulator:
Task Standards:                 At the completion of this JPM the examinee has recognized the failure of two (2)
x In-Plant:
Control Element Assemblies (CEAs) to insert and has taken action to perform Emergency Boration.
Task Standards:
Required Materials:             EOP 2525, Standard Post Trip Actions (procedures, equipment, etc.)   EOP 2541, Appendix 3, Emergency boration General  
At the completion of this JPM the examinee has recognized the failure of two (2) Control Element Assemblies (CEAs) to insert and has taken action to perform Emergency Boration.
Required Materials:
EOP 2525, Standard Post Trip Actions (procedures, equipment, etc.) EOP 2541, Appendix 3, Emergency boration General  


==References:==
==References:==
EOP 2525, Standard Post Trip Actions EOP 2541, Appendix 3, Emergency boration 3


EOP 2525, Standard Post Trip Actions EOP 2541, Appendix 3, Emergency boration 3 
                                        *** READ TO THE EXAMINEE ***
*** READ TO THE EXAMINEE *** I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
JPM WORKSHEET JPMNumber:                       JPM-Sl                             Revision:         8/0 Initial Conditions:
JPMNumber:
* The plant is at 100% power with all systems and equipment operating normally.
JPM WORKSHEET JPM-Sl Revision:
8/0 Initial Conditions:
Initiating Cues:
Initiating Cues:
* The plant is at 100% power with all systems and equipment operating normally.
* You are the RO.
* You are the RO.
* Respond to alarms and changing plant conditions on the Primary side.
* Respond to alarms and changing plant conditions on the Primary side.
* The examiner will act as the US. Simulator Requirements:
* The examiner will act as the US.
Simulator Requirements:
* Reset the simulator to any 100% power. IC-20 was used in validation.
* Reset the simulator to any 100% power. IC-20 was used in validation.
* Enter RD0201 and RD0238; CEA #1 and #38 stuck out on trip.
* Enter RD0201 and RD0238; CEA #1 and #38 stuck out on trip.
* Set up RP02, spurious Reactor trip on trigger 1. ****NOTES TO TASK PERFORMANCE EVALUATOR****
* Set up RP02, spurious Reactor trip on trigger 1.
                    ****NOTES TO TASK PERFORMANCE EVALUATOR****
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). 4 PERFORMANCE INFORMATION JPMNumber:
: 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
JPM-Sl Revision:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
8/0 Task Title: Emergency Boration STARTTIME: STEP Performance:
4
Standard:
 
Critical:
PERFORMANCE INFORMATION JPMNumber:           JPM-Sl                                                           Revision:   8/0 Task
Grade #1 Report that the Reactor has tripped Examinee observes indications and alarms of a YO N[gj so uo Reactor trip. Examinee reports the Reactor trip to the Unit Supervisor.
 
==Title:==
Emergency Boration STARTTIME: ~~~-
STEP Performance:                                   Standard:                                             Critical:       Grade
#1 Report that the Reactor has tripped           Examinee observes indications and alarms of a         YO   N[gj     so uo Reactor trip.
Examinee reports the Reactor trip to the Unit Supervisor.
Cue:
Cue:
* BOOTH: When the examinee has the watch or directed by the floor, initiate trigger 1, inserting malfunction RP02, spurious Reactor trip.
* BOOTH: When the examinee has the watch or directed by the floor, initiate trigger 1, inserting malfunction RP02, spurious Reactor trip.
* Examiner:
* Examiner: When the Examinee reports the Reactor trip, acknowledge and direct the RO to commence EOP 2525, Standard Post Trip Actions and state "going to alarm silence". Pause for a moment while the RO checks C-04 indications, and then (if necessary) ask the RO, "Status of the reactor?" and acknowledge the response.
When the Examinee reports the Reactor trip, acknowledge and direct the RO to commence EOP 2525, Standard Post Trip Actions and state "going to alarm silence".
* BOOTH: Once the US (Examiner) states "going to alarm silence", place all annunciators in "silence".
Pause for a moment while the RO checks C-04 indications, and then (if necessary) ask the RO, "Status of the reactor?" and acknowledge the response.
* FLOOR: Once the RO has commenced actions on C-02/3, change the PPC screens to "post-trip".
* BOOTH: Once the US (Examiner) states "going to alarm silence", place all annunciators in "silence" .
Comments:
* FLOOR: Once the RO has commenced actions on C-02/3, change the PPC screens to "post-trip" . Comments:
STEP Performance:                                   Standard:                                             Critical:       Grade
STEP Performance:
#2 EOP 2525                                                                                             YO   N[gj     so uo Reactivity Control - Reactor Trip             When asked about the status of Reactivity Control,
Standard:
: 1. ENSURE Reactor trip by ALL of           the examinee reports that the Reactor is tripped, the following:                         two CEAs are stuck out, power is dropping, and Startup Rate is negative.
Critical:
* ALL CEAs fully INSERTED .
Grade #2 EOP 2525 YO N[gj so uo Reactivity Control -Reactor Trip When asked about the status of Reactivity Control, 1. ENSURE Reactor trip by ALL of the examinee reports that the Reactor is tripped, the following:
* Reactor power is dropping .       Examinee states that he/she must perform the
two CEAs are stuck out, power is dropping, and
* SUR is negative .                 contingency action and commence Emergency Boration per Appendix 3.
* ALL CEAs fully INSERTED . Startup Rate is negative.
Cue:
* Reactor power is dropping . Examinee states that he/she must perform the
Comments: Examinee reports to the US are not critical, only that Emergency Boration is commenced.
* SUR is negative . contingency action and commence Emergency Boration per Appendix 3. Cue: Comments:
5
Examinee reports to the US are not critical, only that Emergency Boration is commenced.
 
5 PERFORMANCE INFORMATION JPMNumber:
PERFORMANCE INFORMATION JPMNumber:           JPM-Sl                                                         Revision: 8/0 Task
JPM-Sl Revision:
 
8/0 Task Title: Emergency Boration STEP Performance:
==Title:==
Standard:
Emergency Boration STEP Performance:                                 Standard:                                           Critical: Grade
Critical:
#3 2525 RESPONSE NOT OBTAINED                   Examinee goes to RESPONSE NOT OBTAINED             YON~      so uo 1.1 PERFORM the following:                   step 1.1. b commences emergency boration using Appendix 3, "Emergency Boration."
Grade #3 2525 RESPONSE NOT OBTAINED Examinee goes to RESPONSE NOT OBTAINED so uo 1.1 PERFORM the following:
: b. IF more than ONE CEA is not fully inserted, THEN USE Appendix Exatninee may use the laminated copy of 3, "Emergency Boration," and Attachment 3-A, which starts with JPM Step #5, COMMENCE emergency boration.
step 1.1. b commences emergency boration using b. IF more than ONE CEA is not Appendix 3, "Emergency Boration." fully inserted, THEN USE Appendix Exatninee may use the laminated copy of 3, "Emergency Boration," and COMMENCE emergency boration.
or reference BOP 2541, Appendix 3 (JPM Step #4).
Attachment 3-A, which starts with JPM Step #5, or reference BOP 2541, Appendix 3 (JPM Step #4). Cue: Comments:
Cue:
RESPONSE NOT OBTAINED step 1.1.a, IF Reactor trip breakers are CLOSED, THEN INSERT CEAs by ANY of the following methods. This step is not applicable since the Reactor trip breakers are OPEN. STEP Performance:
Comments: RESPONSE NOT OBTAINED step 1.1.a, IF Reactor trip breakers are CLOSED, THEN INSERT CEAs by ANY of the following methods. This step is not applicable since the Reactor trip breakers are OPEN.
Standard:
STEP Performance:                                 Standard:                                           Critical: Grade
Critical:
#4 BOP 2541, Appendix 3                         Examinee goes to Attachment 3-A, "Commencing       YON~      so uo
Grade #4 BOP 2541, Appendix 3 Examinee goes to Attachment 3-A, "Commencing so uo 1. IF emergency boration is desired, Emergency Boration." And commences emergency PERFORM Attachment 3-A, boration. "Commencing Emergency Boration." Cue: Comments:
: 1. IF emergency boration is desired,     Emergency Boration." And commences emergency PERFORM Attachment 3-A,               boration.
6 PERFORMANCE INFORMATION JPMNumber:
            "Commencing Emergency Boration."
JPM-Sl Revision:
Cue:
8/0 Task Title: Emergency Boration STEP Performance:
Comments:
Standard:
6
Critical:
 
Grade #5 EOP 2541, Appendix 3, Attachment 3A Examinee observes level in both Boric Acid so uo 1. IF boric acid storage tanks are Storage Tanks are >75% and detennines that both available, INITIATE emergency tanks are available.
PERFORMANCE INFORMATION JPMNumber:           JPM-Sl                                                         Revision: 8/0 Task
boration as follows: Cue: Comments:
 
STEP Performance:
==Title:==
Standard:
Emergency Boration STEP Performance:                             Standard:                                               Critical: Grade
Critical:
#5 EOP 2541, Appendix 3, Attachment 3A     Examinee observes level in both Boric Acid           YON~        so uo Storage Tanks are >75% and detennines that both
Grade #6 a. ENSURE CH-512, VCT makeup Exarninee ensures CH-512, VCT Makeup Valve, so uo valve stop is closed. (on C-04) is closed by observing the green (closed) light is lit and the red (open) light is NOT lit. Cue: Comments:
: 1. IF boric acid storage tanks are tanks are available.
STEP Performance:
available, INITIATE emergency boration as follows:
Standard:
Cue:
Critical:
Comments:
Grade #7 b. ENSURE CH-196, VCT makeup Exarninee ensures CH-196, VCT Makeup Bypass so uo bypass is closed. Valve, (on C-02) is closed by observing the green (closed) light is lit and the red (open) light is NOT lit. Cue: Comments:
STEP Performance:                             Standard:                                               Critical: Grade
7 PERFORMANCE INFORMATION JPMNumber:
#6       a. ENSURE CH-512, VCT makeup       Exarninee ensures CH-512, VCT Makeup Valve,           YON~      so uo valve stop is closed.           (on C-04) is closed by observing the green (closed) light is lit and the red (open) light is NOT lit.
JPM-Sl Revision:
Cue:
8/0 Task Title: Emergency Boration STEP Performance:
Comments:
Standard:
STEP Performance:                             Standard:                                               Critical: Grade
Critical:
#7     b. ENSURE CH-196, VCT makeup         Exarninee ensures CH-196, VCT Makeup Bypass           YON~      so uo bypass is closed.               Valve, (on C-02) is closed by observing the green (closed) light is lit and the red (open) light is NOT lit.
Grade #8 c. OPEN CH-514, boric acid Examinee opens 2-CH-514, boric acid isolation, by Yi:8] NO so uo isolation.
Cue:
momentarily holding the handswitch in the "OPEN" position and observing the associated red light is lit and the green light is NOT lit (on C-02). Cue: Comments:
Comments:
STEP Performance:
7
Standard:
 
Critical:
PERFORMANCE INFORMATION JPMNumber:           JPM-Sl                                                               Revision:     8/0 Task
Grade #9 d. START BOTH boric acid
 
* Examinee starts both "A" and "B" Boric Acid Yi:8] NO so uo pumps. Pumps by momentarily placing the respective handswitches to "START".
==Title:==
* Examinee observes the associated red light is lit and the green light is NOT lit. Cue: Comments:
Emergency Boration STEP Performance:                                   Standard:                                                   Critical: Grade
The only Critical part of this step is to start both boric acid pumps. STEP Performance:
#8       c. OPEN CH-514, boric acid               Examinee opens 2-CH-514, boric acid isolation, by         Yi:8] NO   so uo isolation.                           momentarily holding the handswitch in the "OPEN" position and observing the associated red light is lit and the green light is NOT lit (on C-02).
Standard:
Cue:
Critical:
Comments:
Grade #10 e. CLOSE BOTH boric acid pump Examinee takes 2-CH-510 and 2-CH-511 switches YO Ni:8] so uo recirc valves: to the "CLOSE" position.
STEP Performance:                                   Standard:                                                   Critical: Grade
* CH-510 Examinee observes both valves are closed by
#9       d. START BOTH boric acid
* CH-511 observing the green (closed) lights are lit and the red (open) lights are NOT lit. Cue: Comments:
* Examinee starts both "A" and "B" Boric Acid             Yi:8] NO   so uo pumps.                                   Pumps by momentarily placing the respective handswitches to "START".
The step is not critical because boric acid iajection will still occur with these valves full open. 8 PERFORMANCE INFORMATION JPMNumber:
* Examinee     observes the associated red light is lit and the green light is NOT lit.
JPM-Sl Revision:
Cue:
8/0 Task Title: Emergency Boration STEP Performance:
Comments: The only Critical part of this step is to start both boric acid pumps.
Standard:
STEP Performance:                                   Standard:                                                   Critical: Grade
Critical:
#10     e. CLOSE BOTH boric acid pump             Examinee takes 2-CH-510 and 2-CH-511 switches             YO Ni:8]   so uo recirc valves:                         to the "CLOSE" position.
Grade #11 f. OPEN BOTH boric acid gravity Examinee takes CH-508 and CH-509 handswitches y[;g] NO so uo feed isolations:
* CH-510                               Examinee observes both valves are closed by
to the "OPEN" position.
* CH-511                               observing the green (closed) lights are lit and the red (open) lights are NOT lit.
* CH-508 Exarninee observes both valves are go open and the
Cue:
* CH-509 associated red lights are lit and the green lights are NOT lit (on C-02). Cue: Comments:
Comments: The step is not critical because boric acid iajection will still occur with these valves full open.
STEP Performance:
8
Standard:
 
Critical:
PERFORMANCE INFORMATION JPMNumber:             JPM-Sl                                                       Revision:   8/0 Task
Grade #12 g. CLOSE CH-501, VCT outlet Examinee closes CH-501, VCT outlet isolation, by y[;g] NO so uo isolation.
 
holding the handswitch in the "CLOSE" position until the associated red light is NOT lit and the green light is lit (on C-02). Cue: Comments:
==Title:==
STEP Performance:
Emergency Boration STEP Performance:                             Standard:                                                 Critical: Grade
Standard:
#11     f. OPEN BOTH boric acid gravity     Examinee takes CH-508 and CH-509 handswitches           y[;g] NO   so uo feed isolations:                 to the "OPEN" position.
Critical:
* CH-508                         Exarninee observes both valves are go open and the
Grade #13 h. ENSURE BOTH of the following Examinee observes both valves are closed by YO N[;g] so uo are closed: observing the green (closed) lights are lit and the
* CH-509                         associated red lights are lit and the green lights are NOT lit (on C-02).
* CH-192, RWST isolation red (open) lights are NOT lit (on C-02).
Cue:
* CH-504, RWST to charging suction. Cue: Comments:
Comments:
9 PERFORMANCE INFORMATION JPMNumber:
STEP Performance:                             Standard:                                                 Critical: Grade
JPM-Sl Revision:
#12     g. CLOSE CH-501, VCT outlet         Examinee closes CH-501, VCT outlet isolation, by       y[;g] NO   so uo isolation.                       holding the handswitch in the "CLOSE" position until the associated red light is NOT lit and the green light is lit (on C-02).
8/0 Task Title: Emergency Boration STEP Performance:
Cue:
Standard:
Comments:
Critical:
STEP Performance:                             Standard:                                                 Critical: Grade
Grade #14 i. IF CH-500, letdown divert Examinee observes CH-500, Letdown Divert so uo handswitch is in the "VCT" handswitch position and places it in "RWS" as position, PLACE the valve to the necessary. "RWS" position.
#13       h. ENSURE BOTH of the following     Examinee observes both valves are closed by             YO N[;g]   so uo are closed:                     observing the green (closed) lights are lit and the
Cue: Comments:
* CH-192, RWST isolation         red (open) lights are NOT lit (on C-02).
This step has no relevance to the success of the task. STEP Performance:
* CH-504, RWST to charging suction.
Standard:
Cue:
Critical:
Comments:
Grade #15 j. ENSURE at least one charging Examinee determines the "A" and "C" Charging so uo pump is operating.
9
Pumps are operating by observing the associated red light is lit and the green light is NOT lit. Cue: Comments:
 
Examinee may start the "B" charging pump, though this is not required for this JPM. STEP Performance:
PERFORMANCE INFORMATION JPMNumber:         JPM-Sl                                                             Revision:   8/0 Task
Standard:
 
Critical:
==Title:==
Grade #16 k. CHECK charging flow is greater Examinee observes Charging flow is greater than so uo than40 gpm. 40 gpm and reports indication to the US. Cue: Acknowledge the report or, if necessary, ask the RO for a status. Comments:
Emergency Boration STEP Performance:                                 Standard:                                               Critical:   Grade
Establishing>/=
#14     i. IF CH-500, letdown divert             Examinee observes CH-500, Letdown Divert               YON~        so uo handswitch is in the "VCT"           handswitch position and places it in "RWS" as position, PLACE the valve to the     necessary.
40 gpm charging flow with a suction source of the BAST completes the JPM. TERMINATION CUE: The evaluation for this JPM is concluded.
            "RWS" position.
STOP TIME: ---10 VERIFICATION OF JPM COMPLETION JPMNumber:
Cue:
JPM-Sl Revision:
Comments: This step has no relevance to the success of the task.
8/0 Date Performed:
STEP Performance:                                 Standard:                                               Critical:   Grade
Student: For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
#15     j. ENSURE at least one charging         Examinee determines the "A" and "C" Charging           YON~        so uo pump is operating.                   Pumps are operating by observing the associated red light is lit and the green light is NOT lit.
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. As necessary, refer to TIG-04 for additional Pass/Fail criteria.
Cue:
EVALUATION SECTION: Time Critical Task? D Yes [:gj No Validated Time (minutes):
Comments: Examinee may start the "B" charging pump, though this is not required for this JPM.
I 15 min Actual Time to Complete (minutes):
STEP Performance:                                 Standard:                                               Critical: Grade
I Work Practice Performance:
#16     k. CHECK charging flow is greater       Examinee observes Charging flow is greater than       YON~        so uo than40 gpm.                           40 gpm and reports indication to the US.
D SAT D UNSAT Operator Fundamentals:
Cue: Acknowledge the report or, if necessary, ask the RO for a status.
D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question #1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:
Comments: Establishing>/= 40 gpm charging flow with a suction source of the BAST completes the JPM.
TERMINATION CUE: The evaluation for this JPM is concluded.
STOP TIME: - - -
10
 
VERIFICATION OF JPM COMPLETION JPMNumber:                               JPM-Sl                                       Revision:             8/0 Date Performed:
Student:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
As necessary, refer to TIG-04 for additional Pass/Fail criteria.
EVALUATION SECTION:
Time Critical Task?                                 D   Yes [:gj No Validated Time (minutes):             15 min       Actual Time to Complete (minutes):
I                                                                  I Work Practice Performance:                         D   SAT             D   UNSAT Operator Fundamentals:                             D   SAT             D   UNSAT JPM Question Portion Overall [NLO only]:           D   SAT             D   UNSAT               D   N/A Attached Question #1       D   SAT             D   UNSAT Attached Question #2       D   SAT             D   UNSAT Overall Result of JPM:                             D   SAT             D UNSAT Evaluator:
Print I Sign Areas for Improvement I Comments:
Print I Sign Areas for Improvement I Comments:
11 JPMNumber:
11
Initial Conditions:
 
Initiating Cues: STUDENT HANDOUT JPM-Sl Revision:
STUDENT HANDOUT JPMNumber:                        JPM-Sl                               Revision:         8/0 Initial Conditions:
8/0
* The plant is at 100% power with all systems and equipment operating normally.
* The plant is at 100% power with all systems and equipment operating normally.
Initiating Cues:
* You are the RO.
* You are the RO.
* Respond to alarms and changing plant conditions on the Primary side.
* Respond to alarms and changing plant conditions on the Primary side.
* The examiner will act as the US. 12
* The examiner will act as the US.
\ JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: Verify SI Flow IA W EOP 2532, LOCA JPMNumber:
12
JPM-S2 Revision:
 
010 Initiated:
\
Robert L. Cimmino, Jr. (Signature on File) 01/30/2017 Developer Date Reviewed:
JOB PERFORMANCE MEASURE APPROVAL SHEET JPM
Will Chesnutt (Signature on File) 01/31/2017 Technical Reviewer Date Approved:
 
Michael John Cote (Signature on File) 02/01/2017 Supervisor, Nuclear Training Date I
==Title:==
Verify SI Flow IAW EOP 2532, LOCA JPMNumber:     JPM-S2                               Revision:       010 Initiated:
Robert L. Cimmino, Jr. (Signature on File)         01/30/2017 Developer                             Date Reviewed:
Will Chesnutt (Signature on File)             01/31/2017 Technical Reviewer                         Date Approved:
Michael John Cote (Signature on File)           02/01/2017 Supervisor, Nuclear Training                   Date I


==SUMMARY==
==SUMMARY==
OF CHANGES DATE DESCRIPTION REV/CHANGE 01/17/17 rlc Create JPM for NRC 2017 Re-Take 010 2 JPM WORKSHEET Facility:
OF CHANGES DATE                         DESCRIPTION   REV/CHANGE 01/17/17 rlc Create JPM for NRC 2017 Re-Take       010 2
MPUnit2 Examinee:
 
JPMNumber:
JPM WORKSHEET Facility:     MPUnit2                       Examinee:
JPM-S2 Revision:
JPMNumber:                                                            Revision:
0/0 ----Task Title: Verify SI Flow IA W EOP 2532, LOCA System: LPSI Time Critical Task: DYES [3J NO Validated Time (minutes):
JPM-S2                                           - -0/0- -
12 ------Task Number(s):
Task
000-05-222 Applicable To: RO x PEO ---SRO ---STA ----KIA Number: KIA Rating: --------006/A3.03 4.1/4.1 Method of Testing: Simulated Performance:
 
Actual Performance:
==Title:==
x Location:
Verify SI Flow IAW EOP 2532, LOCA System:             LPSI Time Critical Task:                   DYES       [3J NO Validated Time (minutes): - - - -
Classroom:
Task Number(s):                         000-05-222 Applicable To:               SRO
Simulator:
                                      ---           STA - - - -             RO      x          PEO KIA Rating:
x In-Plant:
KIA Number:               006/A3.03                             - - -4.1/4.1 Method of Testing:         Simulated Performance:                                   Actual Performance:           x Location:                   Classroom:                           Simulator:       x                 In-Plant:
Task Standards:
Task Standards:                 At the completion of this JPM, the examinee has recognized SI flow is not adequate and has taken action to open Facility 2 LPSI injection valves that had failed to open on the already triggered SIAS signal.
At the completion of this JPM, the examinee has recognized SI flow is not adequate and has taken action to open Facility 2 LPSI injection valves that had failed to open on the already triggered SIAS signal. Required Materials:
Required Materials:             EOP 2532, LOCA, Step 4 through Step 6.
EOP 2532, LOCA, Step 4 through Step 6. (procedures, equipment, etc.) EOP 2541, Appendix 2, Figure 3 -"Pre-SRAS Minimum Required SI Flow" General  
(procedures, equipment, etc.)   EOP 2541, Appendix 2, Figure 3 - "Pre-SRAS Minimum Required SI Flow" General  


==References:==
==References:==
EOP 2532, Loss Of Coolant Accident
                                        *** READ TO THE EXAMINEE ***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
3


EOP 2532, Loss Of Coolant Accident *** READ TO THE EXAMINEE *** I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied.
JPM WORKSHEET JPMNumber:                     JPM-S2                       Revision:       0/0 Initial Conditions:           1. Plant tripped on EHC malfunction, the crew completed EOP 2525, Standard Post Trip Actions.
With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
: 2. Immediately after transitioning to EOP 2526, Reactor Trip Recovery, 24C de-energized due to a bus fault and a Large Break LOCA occurred.
3 JPM WORKSHEET JPMNumber:
JPM-S2 Revision:
0/0 Initial Conditions:
Initiating Cues: Simulator Requirements:
: 1. Plant tripped on EHC malfunction, the crew completed EOP 2525, Standard Post Trip Actions. 2. Immediately after transitioning to EOP 2526, Reactor Trip Recovery, 24C de-energized due to a bus fault and a Large Break LOCA occurred.
: 3. The crew then transitioned to EOP 2532, Loss of Coolant Accident.
: 3. The crew then transitioned to EOP 2532, Loss of Coolant Accident.
: 4. All steps in EOP 2532, LOCA have been completed through step 3. 5. Based on a loss ofRCP NPSH, all the RCPs are secured and TIC-4165 is in Manual-Closed.
: 4. All steps in EOP 2532, LOCA have been completed through step 3.
: 1. You are the Reactor Operator (RO). 2. The Unit Supervisor has directed you to perform steps 4, 5 and 6 ofEOP 2532, Loss Of Coolant Accident.
: 5. Based on a loss ofRCP NPSH, all the RCPs are secured and TIC-4165 is in Manual-Closed.
: 1. Reset Simulator to any power IC, [IC-140 presently set up] ensure CRACS is operating on Z-1. 2. Trip the plant and perform EOP 2525, immediate actions only. 3. Initiate a loss of 24C (ED05C) an trip the "A" EDG. 4. Then initiate a LOCA using RC02A @ 4000#/s, no ramp. 5. Acknowledge all alarms, ensure alarms are not silenced, and wait for RCS pressure to lower enough to allow LPSI flow. 6. When LPSI has been injecting for about 10 minutes, then override closed both of the Facility 2 LPSI injection valves. 7. Ensure SI flow curve is displayed on booth PPC monitor and be ready to print the screen if requested by the NRC examiner.
Initiating Cues:             1. You are the Reactor Operator (RO).
: 8. FREEZE the simulator until the exarninee takes the watch. ****NOTES TO TASK PERFORMANCE EVALUATOR****
: 2. The Unit Supervisor has directed you to perform steps 4, 5 and 6 ofEOP 2532, Loss Of Coolant Accident.
Simulator Requirements:       1. Reset Simulator to any power IC, [IC-140 presently set up] ensure CRACS is operating on Z-1.
: 2. Trip the plant and perform EOP 2525, immediate actions only.
: 3. Initiate a loss of 24C (ED05C) an trip the "A" EDG.
: 4. Then initiate a LOCA using RC02A @ 4000#/s, no ramp.
: 5. Acknowledge all alarms, ensure alarms are not silenced, and wait for RCS pressure to lower enough to allow LPSI flow.
: 6. When LPSI has been injecting for about 10 minutes, then override closed both of the Facility 2 LPSI injection valves.
: 7. Ensure SI flow curve is displayed on booth PPC monitor and be ready to print the screen if requested by the NRC examiner.
: 8. FREEZE the simulator until the exarninee takes the watch.
                  ****NOTES TO TASK PERFORMANCE EVALUATOR****
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance ofthis JPM (in-plant only). 4 PERFORMANCE INFORMATION JPM Number: JPM-S2 Revision:
: 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
0/0 Task Title: Verify SI Flow IA W EOP 2532, LOCA START TIME: ----STEP Performance:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance ofthis JPM (in-plant only).
Standard:
4
Critical:
 
Grade #1 EOP 2532, LOCA YD N[gj so uo Check SIAS Actuation
PERFORMANCE INFORMATION JPM Number:         JPM-S2                                                           Revision:     0/0 Task
: 4. IF pressurizer pressure is less than 1 714 Examinee refers to Step 4 of EOP 2532 and notes psia, PERFORM ALL of the following:
 
that SIAS, CIAS and EBF AS have actuated.
==Title:==
: a. ENSURE SIAS, CIAS and EBF AS have actuated. (CO 1) Cue: BOOTH: When the examinee is ready to take the watch, place the simulator in RUN. Comments:
Verify SI Flow IAW EOP 2532, LOCA START TIME: - - - -
Exarninee may note LPSI injection valves, SI-635 and SI-645, have not opened and either open them or recommend they be opened. Concur and direct. STEP Performance:
STEP Performance:                                     Standard:                                             Critical:       Grade
Standard:
#1 EOP 2532, LOCA                                                                                         YD N[gj         so uo Check SIAS Actuation
Critical:
: 4. IF pressurizer pressure is less than 1714    Examinee refers to Step 4 of EOP 2532 and notes psia, PERFORM ALL of the following:         that SIAS, CIAS and EBF AS have actuated.
Grade #2 Check SIAS Actuation YD N[gj so uo b. ENSURE ONE complete facility of Exarninee notes Facility 1 CRACS in not operating CRACS is operating in the recirc due to loss of power (and Fae. 1 section is N/A). mode: (C25) Facility 1 Cue: Comments:
: a. ENSURE SIAS, CIAS and EBF AS have actuated. (CO 1)
5 PERFORMANCE INFORMATION JPM Number:
Cue:
Revision:
BOOTH: When the examinee is ready to take the watch, place the simulator in RUN.
0/0 Task Title: Verify SI Flow IAW EOP 2532, LOCA STEP Performance:
Comments:
Standard:
Exarninee may note LPSI injection valves, SI-635 and SI-645, have not opened and either open them or recommend they be opened.
Critical:
Concur and direct.
Grade #3 4. Check SIAS Actuation (cont) YO N[gj so uo b. ENSURE ONE complete facility of CRACS is operating in the recirc mode: (C25) Facility 2 Examinee verifies Facility 2 CRACS is operating
STEP Performance:                                     Standard:                                               Critical:       Grade
* HV-203B, Fan F-21B exhaust damper is open. in recirc mode by performing the following:
#2 Check SIAS Actuation                                                                                   YD     N[gj     so uo
: b. ENSURE ONE complete facility of           Exarninee notes Facility 1 CRACS in not operating CRACS is operating in the recirc         due to loss of power (and Fae. 1 section is N/A).
mode: (C25)
Facility 1 Cue:
Comments:
5
 
PERFORMANCE INFORMATION JPM Number:     _JP=-=-=M=-=-S=-=2~--------------- Revision:                                 0/0 Task
 
==Title:==
Verify SI Flow IAW EOP 2532, LOCA STEP Performance:                                   Standard:                                         Critical: Grade
#3 4. Check SIAS Actuation (cont)                                                                   YO   N[gj so uo
: b. ENSURE ONE complete facility of CRACS is operating in the recirc mode: (C25)
Facility 2 Examinee verifies Facility 2 CRACS is operating
* HV-203B, Fan F-21B exhaust           in recirc mode by performing the following:
damper is open.
* Fan F-21B, supply fan is running .
* Fan F-21B, supply fan is running .
* Starts F-21B supply fan
* Starts F-21B supply fan
* HV-206B, Fan F-31B exhaust
* HV-206B, Fan F-31B exhaust
* Notes HV-203B damper opens . damper is open.
* Notes HV-203B damper opens .
damper is open.
* Starts F-31B, exhaust fan .
* Starts F-31B, exhaust fan .
* Fan F-3 lB, exhaust fan is running .
* Fan F-3 lB, exhaust fan is running .
* Notes HV-206B damper opens .
* Notes HV-206B damper opens .
* HV-212B, Fan F-32B exhaust
* HV-212B, Fan F-32B exhaust
* Notes HV-212B is open . damper is open.
* Notes HV-212B is open.
* Notes F-32B is running .
damper is open.
* Notes F-32B is running.
* Fan F-32B, filter fan is running .
* Fan F-32B, filter fan is running .
* Notes HV-495, fresh air damper is closed .
* Notes HV-495, fresh air damper is closed.
* HV-495, fresh air damper is closed .
* HV-495, fresh air damper is closed .
* Notes HV-496, exhaust air damper is closed .
* Notes HV-496, exhaust air damper is closed .
* HV-496, exhaust air damper is
* HV-496, exhaust air damper is
* Notes HV-497, cable vault exhaust damper is closed. closed.
* Notes HV-497, cable vault exhaust damper is closed.                                 closed.
* HV-497, cable vault exhaust damper is closed. Cue: Comments:
* HV-497, cable vault exhaust damper is closed.
6 PERFORMANCE INFORMATION JPMNumber:
Cue:
JPM-82 Revision:
Comments:
0/0 Task Title: Verify SI Flow IAW EOP 2532, LOCA STEP Performance:
6
Optimize Safety Injection Standard:
 
Critical:
PERFORMANCE INFORMATION JPMNumber:         JPM-82                                                             Revision:   0/0 Task
Grade #4 5. IF SIAS has initiated, PERFORM the a. Examinee checks COlX Facility 2 indication of so uo following:
 
SIAS, CIAS and EBFAS. lfnot previously
==Title:==
: a. CHECK at least one train of SIAS, CIAS opened, notes SI-635 and SI-645 are closed. and EBF AS has properly actuated.
Verify SI Flow IAW EOP 2532, LOCA STEP Performance: Optimize Safety Injection           Standard:                                               Critical:         Grade
: b. Examinee checks for adequate SI flow on the (COlX) PPC or compares total indicated flow on CO 1 b. CHECK that safety injection flow is to required flow per EOP 2541, Appendix 2 adequate.
#4 5. IF SIAS has initiated, PERFORM the           a. Examinee checks COlX Facility 2 indication of       YON~            so uo following:                                     SIAS, CIAS and EBFAS. lfnot previously
Refer To Appendix 2, Figure 3, "Pre-SRAS Minimum Required SI "Figures." Flow". Cue: Comments:
: a. CHECK at least one train of SIAS, CIAS       opened, notes SI-635 and SI-645 are closed.
STEP Performance:
and EBFAS has properly actuated.       b. Examinee checks for adequate SI flow on the (COlX)                                     PPC or compares total indicated flow on CO 1
Optimize Safety Injection Standard:
: b. CHECK that safety injection flow is         to required flow per EOP 2541, Appendix 2 adequate. Refer To Appendix 2,             Figure 3, "Pre-SRAS Minimum Required SI "Figures."                                 Flow".
Critical:
Cue:
Grade #5 CONTINGENCY ACTIONS a.1 Examinee notes two LPSI iajection valves so uo a.l IF ANY component is not in its required (SI-635 and SI-645) are indicating not in their position, manually ALIGN the applicable accident position (blue light off -C-OlX or component.
Green light lit, red light off -C-01 ). b.1 PERFORM ANY of the following to restore Examinee then uses C-01 control switches to safety injection flow within the SI Flow open SI-635 and SI-645 (red lights are lit and Curve: the green lights* are off for both valves). 1) ENSURE electrical power to safety b.l If LPSI SI valves were not opened in the injection pumps and valves. previous step, examinee performs step b.1 2) ENSURE correct safety injection valve 1) Examinee notes SI pumps and valves have lineup. adequate electrical power. 2) Examinee notes two LPSI injection valves are closed and opens injection valves until adequate SI flow is achieved (App. 2). Cue: Once LPSI injection valves are opened enough to satisfy EOP 2541Appendix2 Figure 3, the JPM is complete.
Comments:
Comments:
Opening the LPSI injection valves enough to meet SI flow IA W App. 2 figure in either step "a. l" or "b.1" is acceptable.
STEP Performance: Optimize Safety Injection          Standard:                                                Critical:          Grade
Satisfactory completion of this step requires LPSI injection flow indication on C-01 or the PPC meet Figure 3 of Appendix 2. TERMINATION CUE: The evaluation for this JPM is concluded.
#5  CONTINGENCY ACTIONS                              a.1  Examinee  notes  two  LPSI  iajection valves    Y~NO              so uo a.l IF ANY component is not in its required            (SI-635 and SI-645) are indicating not in their position, manually ALIGN the applicable          accident position (blue light off - C-OlX or component.                                        Green light lit, red light off - C-01 ).
STOP TIME: ---7 VERIFICATION OF JPM COMPLETION JPMNumber:
Examinee then uses C-01 control switches to b.1 PERFORM ANY of the following to restore open SI-635 and SI-645 (red lights are lit and safety injection flow within the SI Flow the green lights* are off for both valves).
JPM-S2 Revision:
Curve:
0/0 Date Performed:
b.l If LPSI SI valves were not opened in the
Student: For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 1) ENSURE electrical power to safety previous step, examinee performs step b.1 injection pumps and valves.
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. EVALUATION SECTION: Time Critical Task? D Yes Validated Time (minutes):
: 2) ENSURE correct safety injection valve          1) Examinee notes SI pumps and valves have adequate electrical power.
I 12 Actual Time to Complete (minutes):
lineup.
I Work Practice Performance:
: 2) Examinee notes two LPSI injection valves are closed and opens injection valves until adequate SI flow is achieved (App. 2).
D SAT D UNSAT Operator Fundamentals:
Cue: Once LPSI injection valves are opened enough to satisfy EOP 2541Appendix2 Figure 3, the JPM is complete.
D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question #1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:
Comments: Opening the LPSI injection valves enough to meet SI flow IAW App. 2 figure in either step "a. l" or "b.1" is acceptable.
Satisfactory completion of this step requires LPSI injection flow indication on C-01 or the PPC meet Figure 3 of Appendix 2.
TERMINATION CUE: The evaluation for this JPM is concluded.
STOP TIME: - - -
7
 
VERIFICATION OF JPM COMPLETION JPMNumber:                               JPM-S2                                       Revision:         0/0 Date Performed:
Student:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
EVALUATION SECTION:
Time Critical Task?                                 D   Yes ~No Validated Time (minutes):               12         Actual Time to Complete (minutes):
I                                                                  I Work Practice Performance:                         D   SAT             D   UNSAT Operator Fundamentals:                             D   SAT             D   UNSAT JPM Question Portion Overall [NLO only]:           D   SAT             D UNSAT               D   N/A Attached Question #1       D   SAT             D UNSAT Attached Question #2       D   SAT             D UNSAT Overall Result of JPM:                             D   SAT             D UNSAT Evaluator:
Print I Sign Areas for Improvement I Comments:
Print I Sign Areas for Improvement I Comments:
8 JPMNumber:
8
Initial Conditions:
 
Initiating Cues: STUDENT HANDOUT JPM-S2 Revision:
STUDENT HANDOUT JPMNumber:                    JPM-S2                               Revision:         0/0 Initial Conditions: 1. Plant tripped on EHC malfunction, the crew completed EOP 2525, Standard Post Trip Actions.
0/0 1. Plant tripped on EHC malfunction, the crew completed EOP 2525, Standard Post Trip Actions. 2. After transitioning to EOP 2526, Reactor Trip Recovery, 24C de-energized due to a bus fault and a Large Break LOCA occurred.
: 2. After transitioning to EOP 2526, Reactor Trip Recovery, 24C de-energized due to a bus fault and a Large Break LOCA occurred.
: 3. The crew then transitioned to EOP 2532, Loss of Coolant Accident.
: 3. The crew then transitioned to EOP 2532, Loss of Coolant Accident.
: 4. All steps in EOP 2532, LOCA have been completed through step 3. 5. Based on a loss ofRCP NPSH, all the RCPs are secured and TIC-4165 is in Manual-Closed.
: 4. All steps in EOP 2532, LOCA have been completed through step 3.
: 1. You are the Reactor Operator (RO). 2. The Unit Supervisor has directed you to perform steps 4, 5 and 6 of EOP 2532, Loss Of Coolant Accident.
: 5. Based on a loss ofRCP NPSH, all the RCPs are secured and TIC-4165 is in Manual-Closed.
9 JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: Forcing Pressurizer Sprays JPMNumber:
Initiating Cues:   1. You are the Reactor Operator (RO).
JPM-S3 Revision:
: 2. The Unit Supervisor has directed you to perform steps 4, 5 and 6 of EOP 2532, Loss Of Coolant Accident.
0/0 Initiated:
9
Robert L. Cimmino, Jr. (Signature on File) 01/26/2017 Developer Date Reviewed:
 
Will Chesnutt (Signature on File) 01/27/2017 Technical Reviewer Date Approved:
JOB PERFORMANCE MEASURE APPROVAL SHEET JPM
Michael John Cote (Signature on File) 02/1/2017 Supervisor, Nuclear Training Date 1
 
==Title:==
Forcing Pressurizer Sprays JPMNumber:                     JPM-S3               Revision:       0/0 Initiated:
Robert L. Cimmino, Jr. (Signature on File)         01/26/2017 Developer                             Date Reviewed:
Will Chesnutt (Signature on File)             01/27/2017 Technical Reviewer                         Date Approved:
Michael John Cote (Signature on File)             02/1/2017 Supervisor, Nuclear Training                   Date 1


==SUMMARY==
==SUMMARY==
OF CHANGES DATE DESCRIPTION REV/CHANGE 01/06/17 RLC Copied from JPM 223 and revised as JPM-S3 for 2017 NRC 010 Re-Take Exam, modified malfunction from controller output failure to controller input failure (PT-1 OOY). 2 JPM WORKSHEET Facility:
OF CHANGES DATE                             DESCRIPTION                     REV/CHANGE 01/06/17 RLC Copied from JPM 223 and revised as JPM-S3 for 2017 NRC       010 Re-Take Exam, modified malfunction from controller output failure to controller input failure (PT-1 OOY).
MP Unit2 Exarninee:
2
JPMNumber:
JPM-S3 Revision:
0/0 ---Task Title: Forcing Pressurizer Sprays System: Pressurizer Pressure Control System Time Critical Task: DYES Validated Time (minutes):
15 Task Number(s):
Applicable To: KIA Number: Method of Testing: Location:
Task Standards:
Simulator Requirements:
General


==References:==
JPM WORKSHEET Facility:     MP Unit2                      Exarninee:
Revision:
JPMNumber:                        JPM-S3                                          - 0/0 Task


------010-02-002 SRO x STA RO x PEO 010/K6.03 KIA Rating: 3.2/3.6 --------Simulated Performance:
==Title:==
Actual Performance:
Forcing Pressurizer Sprays System:              Pressurizer Pressure Control System Time Critical Task:                  DYES        ~NO Validated Time (minutes):
x Classroom:
Task Number(s):                          010-02-002 Applicable To:                SRO       x         STA                     RO     x           PEO KIA Number:                010/K6.03             KIA Rating: - - -3.2/3.6 Method of Testing:          Simulated Performance:                                   Actual Performance:           x Location:                  Classroom:                           Simulator:       x                 In-Plant:
Simulator:
Task Standards:                At the completion of this JPM, the examinee has attempted to Force Pressurizer Sprays and has taken action to prevent a Reactor trip due to a controller malfunction.
x In-Plant:
Simulator
At the completion of this JPM, the examinee has attempted to Force Pressurizer Sprays and has taken action to prevent a Reactor trip due to a controller malfunction.
* Initialize to a 100% power IC that will allow Forcing Pressurizer Sprays.
* Initialize to a 100% power IC that will allow Forcing Pressurizer Sprays.
Requirements:
* Ensure Channel "Y" is selected for pressure control.
* Ensure Channel "Y" is selected for pressure control.
* CAUTION tag Ch. "X" PIC-lOOX OOS. Place tag on Channel Selector Switch and over controller PIC-1 OOX.
* CAUTION tag Ch. "X" PIC-lOOX OOS. Place tag on Channel Selector Switch and over controller PIC-1 OOX.
* Insert malfunction RX03B, PT-1 OOY Pressure Transmitter failure, at 2348 psia, ramp = 1 min. when exarninee lowers selected pressure controller setpoint.
* Insert malfunction RX03B, PT-1 OOY Pressure Transmitter failure, at 2348 psia, ramp = 1 min. when exarninee lowers selected pressure controller setpoint.
General
==References:==
* OP 2204, Load Changes, Attachment 10, Forcing Pressurizer Sprays
* OP 2204, Load Changes, Attachment 10, Forcing Pressurizer Sprays
* ARP 2590B-212, D-37 on C-0213, PZR Pressure Selected Channel Deviation Hi/Lo
* ARP 2590B-212, D-37 on C-0213, PZR Pressure Selected Channel Deviation Hi/Lo
* ARP 2590B-216, D-38 on C-0213, Pressurizer Ch X Pres Hi/Lo
* ARP 2590B-216, D-38 on C-0213, Pressurizer Ch X Pres Hi/Lo
* ARP 2590B-220, D-39 on C-02/3, Pressurizer Ch Y Pres Hi/Lo
* ARP 2590B-220, D-39 on C-02/3, Pressurizer Ch Y Pres Hi/Lo
* AOP 2585, Immediate Operator Actions *** READ TO THE EXAMINEE *** I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied.
* AOP 2585, Immediate Operator Actions
With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
                                        *** READ TO THE EXAMINEE ***
3 JPM WORKSHEET JPMNumber:
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
JPM-S3 Revision:
3
0/0 Initial Conditions:
 
Initiating Cues: Required Materials: (procedures, equipment, etc.)
JPM WORKSHEET JPMNumber:                   JPM-S3                       Revision:         0/0 Initial Conditions:
* A down-power to 90% is being initiated using OP 2204, Load Changes.
* A down-power to 90% is being initiated using OP 2204, Load Changes.
* All equipment is operating normally.
* All equipment is operating normally.
* Channel "X" Pressure controller, PIC-1 OOX, is Out-Of-Service while l&C investigates an erratic control issue. You are the Reactor Operator (RO) and have been directed to initiate forcing Pressurizer Sprays in accordance with OP 2204, Load Changes, Attachment 10, Forcing Pressurizer Sprays.
* Channel "X" Pressure controller, PIC-1 OOX, is Out-Of-Service while l&C investigates an erratic control issue.
* OP 2204, Load Changes, Attachment 10, Forcing Pressurizer Sprays
Initiating Cues:              You are the Reactor Operator (RO) and have been directed to initiate forcing Pressurizer Sprays in accordance with OP 2204, Load Changes, Attachment 10, Forcing Pressurizer Sprays.
Required Materials:
* OP 2204, Load Changes, Attachment 10, Forcing Pressurizer (procedures, equipment, Sprays etc.)
* ARP 2590B-212, D-37 on C-02/3, PZR Pressure Selected Channel Deviation Hi/Lo
* ARP 2590B-212, D-37 on C-02/3, PZR Pressure Selected Channel Deviation Hi/Lo
* ARP 2590B-216, D-38 on C-02/3, Pressurizer Ch X Pres Hi/Lo
* ARP 2590B-216, D-38 on C-02/3, Pressurizer Ch X Pres Hi/Lo
* ARP 2590B-220, D-39 on C-02/3, Pressurizer Ch Y Pres Hi/Lo
* ARP 2590B-220, D-39 on C-02/3, Pressurizer Ch Y Pres Hi/Lo
* AOP 2585, Immediate Operator Actions ****NOTES TO TASK PERFORMANCE EVALUATOR****
* AOP 2585, Immediate Operator Actions
                  ****NOTES TO TASK PERFORMANCE EVALUATOR****
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). 4 PERFORMANCE INFORMATION JPM Number: JPM-83 Revision:
: 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
0/0 Task Title: Forcing_Pre_ssurizer Sprays START TIME: ----STEP Performance:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Standard:
4
Critical:
 
Grade #1 Examinee reads and acknowledges the Note.
PERFORMANCE INFORMATION JPM Number:         JPM-83
so uo OP 2204, Attachment 10 NOTE: 1. Annunciator C-02 window D-37, "PRESSURIZER SELECTED CHANNEL DEVIATION HI/LO," is expected during performance of this evolution.
_c..:::_::_:__~~~~~~~~~~~~~~~~
: 2. The potential effects of forcing pressurizer spray, due to the pressure coefficient of reactivity, need to be identified to ensure margin exists for thermal power limits. Cue: Provide OP 2204, Load Changes, Attachment 10, Forcing Pressurizer Sprays, to the examinee.
Revision:     0/0 Task
 
==Title:==
Forcing_Pre_ssurizer Sprays START TIME: - - - -
STEP Performance:                                     Standard:                                             Critical:   Grade
#1 OP 2204, Attachment 10                            Examinee reads and acknowledges the Note.           YON~        so uo NOTE:
: 1. Annunciator C-02 window D-37, "PRESSURIZER SELECTED CHANNEL DEVIATION HI/LO," is expected during performance of this evolution.
: 2. The potential effects of forcing pressurizer spray, due to the pressure coefficient of reactivity, need to be identified to ensure margin exists for thermal power limits.
Cue:
Provide OP 2204, Load Changes, Attachment 10, Forcing Pressurizer Sprays, to the examinee.
Comments:
STEP Performance:                                      Standard:                                            Critical:    Grade
#2 OP 2204, Attachment 10 Examinee recognizes that the Pressurizer Pressure    YON~        so uo Channel Selector Switch is NOT in the "X"
: 1. IF using PIC-IOOX, "PRESS CNTL-X," to          position, marks step I as NA, and proceeds to step force sprays, PERFORM the following:          2.
Cue:
Comments:
5
 
PERFORMANCE INFORMATION JPM Number:        JPM-S3                                                          Revision: 0/0 Task
 
==Title:==
Forcing Pressurizer Sprays STEP Performance:                                      Standard:                                          Critical:  Grade
#3  2. IF using PIC-lOOY, "PRESS CNTL-Y," to          PIC-lOOY has been verified in service in previous Y0N0      so uo force sprays, PERFORM the following:          step. Examinee continues with step 2 Cue:
Comments: If requested, provide examinee with a copy of ARP 2590B-212, PZR. PRESSURE SELECTED CHANNEL DEVIATION, D-37 on C-02/3.
STEP Performance:                                      Standard:                                          Critical:  Grade
#4  2.1 To initiate forcing sprays, PERFORM the      Examinee continues with step 2.                  Y0N0      so uo following:
Cue:
Comments:
STEP Performance:                                      Standard:                                          Critical:  Grade
#5  2.1.1 RECORD one of the following from PIC- Examinee observes either the PIC-1 OOY Controller      Y0N0      so uo lOOY, "PRESS CNTL-Y" (C-03):              setpoint (Black and white arrow) on C-03 or the
* Controller  setpoint (black and white    PIC-lOOY  Controller output signal on C-03 and arrow)                                  records>/= 1 of these values on Attachment 10.
* Controller output signal Cue:
Examinee may record both values on Attachment 10.
Comments:
STEP Performance:                                      Standard:                                          Critical:  Grade
#6  2.1.2 RECORD pressurizer pressure. (PPC or        Examinee observes Pressurizer pressure from the  Y0N0      so uo C-03)                                    PPC or on C-03 and records the value on Attachment 10.
Cue:
Comments:
6
 
PERFORMANCE INFORMATION JPM Number:          JPM-S3
                              ~=-=-=-=-~~~~~~~~~~~~~~~~
Revision:    0/0 Task
 
==Title:==
Forcing Pressurizer Sprays STEP Performance:                                      Standard:                                            Critical:  Grade
#7  2.1.3 PLACE all available pressurizer
* Examinee locates all 4 Backup Heater "BACKUP HTRS" group handswitches              handswitches on C-03 and momentarily places      Y~NO      so uo to "CLOSE" (C-03).                            each of them in the "CLOSE" position, observing red lights lit for each group.
Cue:
Comments:
STEP Performance:                                      Standard:                                            Critical:  Grade
#8  2.1.4  Slowly LOWER PIC-lOOY, "PRESS
* Examinee locates the thumbwheel for Pressure CNTL-Y," to obtain both of the                Controller, PIC-lOOY, and rotates it in the      Y~NO      so uo following:                                    downward direction to obtain a 40-50% output on the controller horizontal scale.
* Pressurizer controller output signal
* Examinee observes that the red pointer and the 40%to 50%                                black and white pointer on the vertical scales  YON~      so uo
* The following controllers output          of both Spray Valve Controllers, HIC-lOOE signal start to rise:                    and lOOF, are rising.
0  HIC-lOOE, "PZR SPRAY-IA"
* Examinee observes and acknowledges                YON~      so uo 0  HIC-lOOF, "PZR SPRAY-lB"            annunciator D-37, PZR. PRESSURE SELECTED CHANNEL DEVIATION HI/LO alarm and reports that this is an expected alarm for Forcing Sprays.
Cue:
BOOTH: When annunciator D-37 alarms on C-02/3 (PZR PRESSURE SELECTED CHANNEL DEVIATION), insert malfunction RX03B at 2348 psia with a 1 minute ramp.
Comments: If requested, provide examinee with a copy of ARP 2590B-212, PZR PRESSURE SELECTED CHANNEL DEVIATION HI/LO, D-37 on C-02/3.
7
 
PERFORMANCE INFORMATION JPM Number:        JPM-S3                                                              Revision:    0/0 Task
 
==Title:==
Forcing Pressurizer Sprays STEP  Performance:                                        Standard:                                              Critical:      Grade
#9  2.2 ADJUST PIC-lOOY, "PRESS CNTL-Y" (C-03), as necessary to maintain pressurizer While adjusting PIC-1 OOY setpoint, Examinee        YON~            so uo observes PZR pressure and PZR Spray valves pressure recorded in step 2.1.2.              continuing to OPEN.
Cue:
* If requested, provide examinee with ARP-2590B-220, PRESSURIZER CHY PRES HI/LO, D-39 on C-02/3 .
Comments:
Examinee may not ask for the ARP if Immediate Operator Actions are taken to mitigate the lowering pressure. If ARPs are used to mitigate the event, skip to JPM Step 14 (for alarm D-37) or Step 20 (for alarm D-38/39), depending on the ARP utilized.
STEP  Performance:                                        Standard:                                              Critical:      Grade
#10  AOP 2585 Immediate Operator Actions                Note: AOP 2585 actions contained in steps 10.1 -    YON~            so uo Examinee performs Section 10, Pressurizer          10.4 are required to be performed from memory.
Spray Valve Open:
[10.l] OBSERVE Pressurizer pressure safety          Examinee observes the four Safety Channels of channel indications to evaluate RCS pressure.      pressurizer pressure and notes they are lowering.
Cue:
Comments:
STEP  Performance:                                        Standard:                                          Critical:      Grade
  #11 [10.2] IF Pressurizer pressure less than 2260 psig, manually CLOSE affected spray Examinee verifies PZR pressure < 2260 psia, then places BOTH Spray Valve controllers, Y~NO          so uo valve(s):                                    HIC-1 OOE/F in "M" and manually closes the 0  HIC 1OOE, PZR SPRAY- 1A                affected spray valves on C-03.
0  HIC lOOF, PZR SPRAY- lB Cue:
Comments: This step is not critical if the examinee elects to utilize the ARPs to mitigate the event.
Examinee may also note RCS pressure has dropped below the Tech. Spec. DNB Limit of 2225 psia. This note is not Critical as it is a momentary issue and the Examinee is required to focus on mitigating the problem.
8
 
PERFORMANCE INFORMATION JPM Number:        ~J:..::P~M--"-S'-'-3_ _ _ _ _ _ _ _ _ _ _ _ _ _ __                        Revision:    0/0 Task
 
==Title:==
Forcing Pressurizer Sprays STEP Performance:                                          Standard:                                            Critical:      Grade
#12 [10.3] CHECK affected Pressurizer Spray                Examinee Verifies BOTH spray valves are closed        YO Ni:gj        so uo Valve(s) are closed:                            (red lights off, green lights lit on C-03);
0  HIC 1OOE, PZR SPRAY- I A                  0  HIC I OOE, PZR SPRAY- I A 0  HIC I OOF, PZR SPRAY- I B                  0  HIC I OOF, PZR SPRAY- I B Cue:
Comments:
STEP Performance:                                          Standard:                                            Critical:      Grade
#13 [10.4] START backup heaters as needed.                Examinee notes all backup heaters are already on. YO Ni:gj        so uo Cue:
Comments: Once both spray valves are closed, the JPM is complete.
STEP Performance:                                          Standard:                                            Critical:      Grade
#14 ARP 2590B-212 {C02/3; D-37},                          Examinee notes this is an expected alarm, but may    YO Ni:gj        so uo "PZR PRESSURE SELECTED CHANNEL                        reference the applicable ARP for guidance.
DEVIATION HI/LO" AUTOMATIC FUNCTIONS I. For High alarm, proportional heaters are at        Examinee reads and acknowledges the Automatic minimum output                                    Functions.
: 2. For Low alarm, proportional heaters are at maximum output Cue:
Comments: Steps 14 - 24 are included in case the examinee utilizes the ARPs to mitigate the event. Any critical steps listed in this set are only applicable if the spray valves have not yet been manually closed.
9
 
PERFORMANCE INFORMATION JPM Number:        ......:JP::..=....::M.:..:::_::-S:::3:____ _ _ _ _ _ _ _ _ _ _ _ _ __                    Revision:    0/0 Task
 
==Title:==
Forcing Pressurizer Sprays STEP Performance:                                                              Standard:                                        Critical: Grade
#15 CORRECTIVE ACTIONS                                                                                                          YON~      so uo NOTE; This is an expected alarm when                                      Examinee acknowledges the Note.
forcing pressurizer sprays, or testing heater capacity.
Cue:
Comments:
STEP Performance:                                                              Standard:                                        Critical: Grade
#16 1. OBSERVE the following to evaluate RCS                                  Examinee observes RCS pressure indication and    YON~      so uo pressure:                                                            notes pressure is lowering on Channel "X" and the Safety Channels.
* PRES CNTL-X, PIC-lOOX
* PRES CNTL-Y, PIC-lOOY
* Pressurizer pressure safety channel indication Cue:
Comments:
STEP Performance:                                                              Standard:                                        Critical: Grade
#17 2. IF channel check indicates the controlling                            Examinee may note the controlling channel is      YON~      so uo channel of pressurizer pressure has                                  malfunctioning, but also notes Ch. "X" is malfunctioned, AND the opposite channel is                            unavailable does NOT transfer control to Ch. "X".
operating properly, PERFORM the following (C-03):
Cue: If examinee suggests transferring to Channel "X" (it appears operational), as the US, state the status of Channel "X" is unknown and direct the exarninee to remain in Channel "Y" and continue with required actions.
Comments:
Comments:
STEP Performance:
10
Standard:
 
Critical:
PERFORMANCE INFORMATION JPM Number:       _:J:=. : P:. .:M=.. :-S:. .: 3_ _ _ _ _ _ _ _ _ _ _ _ _ _ __                      Revision:   0/0 Task
Grade #2 Examinee recognizes that the Pressurizer Pressure so uo OP 2204, Attachment 10 Channel Selector Switch is NOT in the "X" 1. IF using PIC-IOOX, "PRESS CNTL-X," to position, marks step I as NA, and proceeds to step force sprays, PERFORM the following:
 
: 2. Cue: Comments:
==Title:==
5 PERFORMANCE INFORMATION JPM Number: JPM-S3 Revision:
Forcing Pressurizer Sprays STEP Performance:                                                   Standard:                                           Critical: Grade
0/0 Task Title: Forcing Pressurizer Sprays STEP Performance:
#18 3. IF channel check indicates the controlling                  Examinee may attempt to raise the selected channel  YD N[gj  so uo channel of pressurizer pressure is operating                setpoint to mitigate the failure, but should soon properly, ENSURE selected channel setpoint                  recognize this action is not succeeding.
Standard:
is adjusted to desired pressurizer pressure (C-03).
Critical:
Cue:
Grade #3 2. IF using PIC-lOOY, "PRESS CNTL-Y," to PIC-lOOY has been verified in service in previous Y0N0 so uo force sprays, PERFORM the following:
Comments:
step. Examinee continues with step 2 Cue: Comments:
STEP Performance:                                                   Standard:                                           Critical: Grade
If requested, provide examinee with a copy of ARP 2590B-212, PZR. PRESSURE SELECTED CHANNEL DEVIATION, D-37 on C-02/3. STEP Performance:
#19 4. IF heaters and spray are not operating                      Examinee should take manual control of both spray    y[g] ND  so uo properly, PERFORM the following:                           valves and close them, or take manual control of 4.1 Manually OPERATE pressurizer heaters                  PIC-1 OOY and lower its output to close both spray valves (green lights lit, red lights off on C-03).
Standard:
and spray to establish desired RCS pressure.
Critical:
Cue:
Grade #4 2.1 To initiate forcing sprays, PERFORM the Examinee continues with step 2. Y0N0 so uo following:
Comments: This step is required only if spray valves have not yet been manually closed.
Cue: Comments:
STEP Performance:
Standard:
Critical:
Grade #5 2.1.1 RECORD one of the following from PIC-Examinee observes either the PIC-1 OOY Controller Y0N0 so uo lOOY, "PRESS CNTL-Y" (C-03): setpoint (Black and white arrow) on C-03 or the
* Controller setpoint (black and white PIC-lOOY Controller output signal on C-03 and arrow) records>/=
1 of these values on Attachment
: 10.
* Controller output signal Cue: Examinee may record both values on Attachment
: 10. Comments:
STEP Performance:
Standard:
Critical:
Grade #6 2.1.2 RECORD pressurizer pressure. (PPC or Examinee observes Pressurizer pressure from the Y0N0 so uo C-03) PPC or on C-03 and records the value on Attachment
: 10. Cue: Comments:
6 PERFORMANCE INFORMATION JPM Number: JPM-S3 Revision:
0/0 Task Title: Forcing Pressurizer Sprays STEP Performance:
Standard:
Critical:
Grade #7 2.1.3 PLACE all available pressurizer
* Examinee locates all 4 Backup Heater "BACKUP HTRS" group handswitches handswitches on C-03 and momentarily places so uo to "CLOSE" (C-03). each of them in the "CLOSE" position, observing red lights lit for each group. Cue: Comments:
STEP Performance:
Standard:
Critical:
Grade #8 2.1.4 Slowly LOWER PIC-lOOY, "PRESS
* Examinee locates the thumbwheel for Pressure CNTL-Y," to obtain both of the Controller, PIC-lOOY, and rotates it in the so uo following:
downward direction to obtain a 40-50% output on the controller horizontal scale.
* Pressurizer controller output signal Examinee observes that the red pointer and the
* 40%to 50% black and white pointer on the vertical scales so uo
* The following controllers output of both Spray Valve Controllers, HIC-lOOE signal start to rise: and lOOF, are rising. 0 HIC-lOOE, "PZR SPRAY-IA"
* Examinee observes and acknowledges so uo 0 HIC-lOOF, "PZR SPRAY-lB" annunciator D-37, PZR. PRESSURE SELECTED CHANNEL DEVIATION HI/LO alarm and reports that this is an expected alarm for Forcing Sprays. Cue: BOOTH: When annunciator D-37 alarms on C-02/3 (PZR PRESSURE SELECTED CHANNEL DEVIATION), insert malfunction RX03B at 2348 psia with a 1 minute ramp. Comments:
If requested, provide examinee with a copy of ARP 2590B-212, PZR PRESSURE SELECTED CHANNEL DEVIATION HI/LO, D-37 on C-02/3. 7 PERFORMANCE INFORMATION JPM Number: JPM-S3 Revision:
0/0 Task Title: Forcing Pressurizer Sprays STEP Performance:
Standard:
Critical:
Grade #9 2.2 ADJUST PIC-lOOY, "PRESS CNTL-Y" While adjusting PIC-1 OOY setpoint, Examinee so uo (C-03), as necessary to maintain pressurizer observes PZR pressure and PZR Spray valves pressure recorded in step 2.1.2. continuing to OPEN. Cue:
* If requested, provide examinee with ARP-2590B-220, PRESSURIZER CHY PRES HI/LO, D-39 on C-02/3 . Comments:
Examinee may not ask for the ARP if Immediate Operator Actions are taken to mitigate the lowering pressure.
If ARPs are used to mitigate the event, skip to JPM Step 14 (for alarm D-37) or Step 20 (for alarm D-38/39), depending on the ARP utilized.
STEP Performance:
Standard:
Critical:
Grade #10 AOP 2585 Immediate Operator Actions Note: AOP 2585 actions contained in steps 10.1 -
so uo Examinee performs Section 10, Pressurizer 10.4 are required to be performed from memory. Spray Valve Open: [10.l] OBSERVE Pressurizer pressure safety Examinee observes the four Safety Channels of channel indications to evaluate RCS pressure.
pressurizer pressure and notes they are lowering.
Cue: Comments:
STEP Performance:
Standard:
Critical:
Grade #11 [10.2] IF Pressurizer pressure less than 2260 Examinee verifies PZR pressure < 2260 psia, then so uo psig, manually CLOSE affected spray places BOTH Spray Valve controllers, valve(s):
HIC-1 OOE/F in "M" and manually closes the 0 HIC 1 OOE, PZR SPRAY-1 A affected spray valves on C-03. 0 HIC lOOF, PZR SPRAY-lB Cue: Comments:
This step is not critical if the examinee elects to utilize the ARPs to mitigate the event. Examinee may also note RCS pressure has dropped below the Tech. Spec. DNB Limit of 2225 psia. This note is not Critical as it is a momentary issue and the Examinee is required to focus on mitigating the problem. 8 PERFORMANCE INFORMATION JPM Number:
_______________
_ Revision:
0/0 Task Title: Forcing Pressurizer Sprays STEP Performance:
Standard:
Critical:
Grade #12 [10.3] CHECK affected Pressurizer Spray Examinee Verifies BOTH spray valves are closed YO Ni:gj so uo Valve(s) are closed: (red lights off, green lights lit on C-03); 0 HIC 1 OOE, PZR SPRAY-I A 0 HIC I OOE, PZR SPRAY-I A 0 HIC I OOF, PZR SPRAY-I B 0 HIC I OOF, PZR SPRAY-I B Cue: Comments:
STEP Performance:
Standard:
Critical:
Grade #13 [10.4] START backup heaters as needed. Examinee notes all backup heaters are already on. YO Ni:gj so uo Cue: Comments:
Once both spray valves are closed, the JPM is complete.
Once both spray valves are closed, the JPM is complete.
STEP Performance:
STEP Performance:                                                   Standard:                                           Critical: Grade
Standard:
#20 ARP 2590B-216[220] {C02/3; D-38[39]},                           Examinee notes this alarm and references the         YD N[gj   so uo "PRESSURIZER CH X[Y] PRES HI/LO"                               applicable ARP for guidance.
Critical:
Grade #14 ARP 2590B-212
{C02/3; D-37}, Examinee notes this is an expected alarm, but may YO Ni:gj so uo "PZR PRESSURE SELECTED CHANNEL reference the applicable ARP for guidance.
DEVIATION HI/LO" AUTOMATIC FUNCTIONS I. For High alarm, proportional heaters are at Examinee reads and acknowledges the Automatic minimum output Functions.
: 2. For Low alarm, proportional heaters are at maximum output Cue: Comments:
Steps 14 -24 are included in case the examinee utilizes the ARPs to mitigate the event. Any critical steps listed in this set are only applicable if the spray valves have not yet been manually closed. 9 PERFORMANCE INFORMATION JPM Number: ......:JP::..=....::M.:..:::_::-S:::3:___
______________
_ Revision:
0/0 Task Title: Forcing Pressurizer Sprays STEP Performance:
Standard:
Critical:
Grade #15 CORRECTIVE ACTIONS so uo NOTE; This is an expected alarm when Examinee acknowledges the Note. forcing pressurizer sprays, or testing heater capacity.
Cue: Comments:
STEP Performance:
Standard:
Critical:
Grade #16 1. OBSERVE the following to evaluate RCS Examinee observes RCS pressure indication and so uo pressure:
notes pressure is lowering on Channel "X" and the
* PRES CNTL-X, PIC-lOOX Safety Channels.
* PRES CNTL-Y, PIC-lOOY
* Pressurizer pressure safety channel indication Cue: Comments:
STEP Performance:
Standard:
Critical:
Grade #17 2. IF channel check indicates the controlling Examinee may note the controlling channel is so uo channel of pressurizer pressure has malfunctioning, but also notes Ch. "X" is malfunctioned, AND the opposite channel is unavailable does NOT transfer control to Ch. "X". operating properly, PERFORM the following (C-03): Cue: If examinee suggests transferring to Channel "X" (it appears operational), as the US, state the status of Channel "X" is unknown and direct the exarninee to remain in Channel "Y" and continue with required actions. Comments:
10 PERFORMANCE INFORMATION JPM Number: _:J:=..::P:...:M=...:-S:...::3
_______________
_ Revision:
0/0 Task Title: Forcing Pressurizer Sprays STEP Performance:
Standard:
Critical:
Grade #18 3. IF channel check indicates the controlling Examinee may attempt to raise the selected channel YD N[gj so uo channel of pressurizer pressure is operating setpoint to mitigate the failure, but should soon properly, ENSURE selected channel setpoint recognize this action is not succeeding.
is adjusted to desired pressurizer pressure (C-03). Cue: Comments:
STEP Performance:
Standard:
Critical:
Grade #19 4. IF heaters and spray are not operating Examinee should take manual control of both spray y[g] ND so uo properly, PERFORM the following:
valves and close them, or take manual control of 4.1 Manually OPERA TE pressurizer heaters PIC-1 OOY and lower its output to close both spray and spray to establish desired RCS valves (green lights lit, red lights off on C-03). pressure.
Cue: Comments:
This step is required only if spray valves have not yet been manually closed. Once both spray valves are closed, the JPM is complete.
STEP Performance:
Standard:
Critical:
Grade #20 ARP 2590B-216[220]
{C02/3; D-38[39]}, Examinee notes this alarm and references the YD N[gj so uo "PRESSURIZER CH X[Y] PRES HI/LO" applicable ARP for guidance.
AUTOMATIC FUNCTIONS
AUTOMATIC FUNCTIONS
: 1. IF high pressure alarm, backup heater breakers trip. Cue: Comments:
: 1. IF high pressure alarm, backup heater breakers trip.
Either Ch. "X" (2590-216) or Ch. "Y" (2590B-220)
Cue:
Hi/Lo alarms may be referenced due to duplicate actions. 11 PERFORMANCE INFORMATION JPM Number: JPM-S3 Revision:
Comments: Either Ch. "X" (2590-216) or Ch. "Y" (2590B-220) Hi/Lo alarms may be referenced due to duplicate actions.
0/0 Task Title: Forcing Pressurizer Sprays STEP Performance:
11
Standard:
 
Critical:
PERFORMANCE INFORMATION JPM Number:         JPM-S3                                                               Revision:         0/0 Task
Grade #21 CORRECTIVE ACTIONS YD NIZJ so uo 1. OBSERVE (CHECK) "PRESSURIZER Examinee observes various pressure indications PRESS, PR-100," pressurizer pressure and notes RCS pressure is lowering.
 
==Title:==
Forcing Pressurizer Sprays STEP Performance:                                           Standard:                                             Critical: Grade
#21 CORRECTIVE ACTIONS                                                                                           YD NIZJ   so uo
: 1. OBSERVE (CHECK) "PRESSURIZER                       Examinee observes various pressure indications PRESS, PR-100," pressurizer pressure               and notes RCS pressure is lowering.
controllers, and pressurizer pressure safety channels (C-03), and PPC indications of applicable RCS pressure.
controllers, and pressurizer pressure safety channels (C-03), and PPC indications of applicable RCS pressure.
Cue: Comments:
Cue:
STEP Performance:
Comments:
Standard:
STEP Performance:                                           Standard:                                             Critical: Grade
Critical:
#22 2. IF channel check indicates that channel "X"         Examinee notes Ch. "X" is unavailable and not the     YIZJ ND   so uo
Grade #22 2. IF channel check indicates that channel "X" Examinee notes Ch. "X" is unavailable and not the YIZJ ND so uo ("Y") is the controlling channel and has controlling channel (step is N/A) malfunctioned, AND channel "Y" ("X") is operating properly, PERFORM the following (C-03): Cue: Comments:
("Y") is the controlling channel and has           controlling channel (step is N/A) malfunctioned, AND channel "Y" ("X") is operating properly, PERFORM the following (C-03):
Not attempting to transfer control to Ch. "X" is the only critical part to this step. STEP Performance:
Cue:
Standard:
Comments: Not attempting to transfer control to Ch. "X" is the only critical part to this step.
Critical:
STEP Performance:                                           Standard:                                             Critical: Grade
Grade #23 3. IF pressure is high, VERIFY the following:
#23 3. IF pressure is high, VERIFY the following:         Examinee notes pressure is low, that the step is       YD NIZJ   so uo 3.1 All heaters are de-energized.                 NIA and takes no action.
Examinee notes pressure is low, that the step is YD NIZJ so uo 3.1 All heaters are de-energized.
3.2 "SPRAY VLVS, RC-lOOE and RC-lOOF" are fully open (C-03).
NI A and takes no action. 3.2 "SPRAY VLVS, RC-lOOE and RC-lOOF" are fully open (C-03). Cue: Comments:
Cue:
This step is only critical if this action is taken and not corrected before the plant trips on low pressure.
Comments: This step is only critical if this action is taken and not corrected before the plant trips on low pressure.
12 PERFORMANCE INFORMATION JPM Number: ....::J:=..::P:...:M.:.::....:-S:...:3
12
_______________
 
_ Revision:
PERFORMANCE INFORMATION JPM Number:       . . : J:=. : P:. .:M.:.: . . :-S:. .:3_ _ _ _ _ _ _ _ _ _ _ _ _ _ __                      Revision:         0/0 Task
0/0 Task Title: Forcing Pressurizer Sprays STEP Performance:
 
Standard:
==Title:==
Critical:
Forcing Pressurizer Sprays STEP Performance:                                                           Standard:                                                 Critical: Grade
Grade #24 4. IF pressure is low, VERIFY the following:
#24 4. IF pressure is low, VERIFY the following:                           Examinee verifies all backup heaters are energized       Y[8J ND   so uo 4.1 All heaters are energized.                                     and takes manual control of both spray valves and 4.2 "SPRAY VL VS, RC- IOOE and                                     closes both valves (green lights lit, red lights off on C-03).
Examinee verifies all backup heaters are energized Y[8J ND so uo 4.1 All heaters are energized.
RC- IOOF" are fully closed (C-03).
and takes manual control of both spray valves and 4.2 "SPRAY VL VS, RC-IOOE and closes both valves (green lights lit, red lights off on RC-IOOF" are fully closed (C-03). C-03). Examinee may also place PIC-1 OOY in "M" and manually drive the output low, which would also close both spray valves if their controllers are still in automatic mode ("A"). Cue: Comments:
Examinee may also place PIC-1 OOY in "M" and manually drive the output low, which would also close both spray valves if their controllers are still in automatic mode ("A").
This step is required only if spray valves have not yet been manually closed. Once both spray valves are closed, the JPM is complete.
Cue:
Comments: This step is required only if spray valves have not yet been manually closed.
Once both spray valves are closed, the JPM is complete.
TERMINATION CUE: The evaluation for this JPM is concluded.
TERMINATION CUE: The evaluation for this JPM is concluded.
STOP TIME: __ _ 13 VERIFICATION OF JPM COMPLETION JPMNumber:
STOP TIME: _ __
JPM-S3 Revision:
13
0/0 Date Performed:
 
Student: For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
VERIFICATION OF JPM COMPLETION JPMNumber:                               JPM-S3                                       Revision:         0/0 Date Performed:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. EVALUATION SECTION: Time Critical Task? 0 Yes 0 No Validated Time (minutes):
Student:
I 15 Actual Time to Complete (minutes):
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
I Work Practice Performance:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
0 SAT 0 UNSAT Operator Fundamentals:
EVALUATION SECTION:
0 SAT 0 UNSAT JPM Question Portion Overall [NLO only]: 0 SAT 0 UNSAT 0 N/A Attached Question #I 0 SAT 0 UNSAT Attached Question #2 0 SAT 0 UNSAT Overall Result of JPM: 0 SAT 0 UNSAT Evaluator:
Time Critical Task?                                 0   Yes   0   No Validated Time (minutes):               15         Actual Time to Complete (minutes):
I                                                                  I Work Practice Performance:                         0   SAT             0   UNSAT Operator Fundamentals:                             0   SAT             0   UNSAT JPM Question Portion Overall [NLO only]:           0   SAT             0 UNSAT               0   N/A Attached Question #I       0   SAT             0 UNSAT Attached Question #2       0   SAT             0 UNSAT Overall Result of JPM:                             0   SAT             0 UNSAT Evaluator:
Print I Sign Areas for Improvement I Comments:
Print I Sign Areas for Improvement I Comments:
14 JPMNumber:
14
Initial Conditions:
 
Initiating Cues: STUDENT HANDOUT JPM-S3 Revision:
STUDENT HANDOUT JPMNumber:                    JPM-S3                               Revision:           0/0 Initial Conditions:
0/0
* A down-power to 90% is being initiated using OP 2204, Load Changes.
* A down-power to 90% is being initiated using OP 2204, Load Changes.
* All equipment is operating normally.
* All equipment is operating normally.
* Channel "X" Pressure controller, PIC-IOOX, is Out-Of-Service while I&C investigates an erratic control issue. You are the Reactor Operator (RO) and have been directed to initiate forcing Pressurizer Sprays in accordance with OP 2204, Load Changes, Attachment 10, Forcing Pressurizer Sprays. 15 JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: Operate the TDAFP using BOP 2541, Appendix 6 (Alt. Path) JPMNumber:
* Channel "X" Pressure controller, PIC-IOOX, is Out-Of-Service while I&C investigates an erratic control issue.
JPM-S4 Revision:
Initiating Cues:    You are the Reactor Operator (RO) and have been directed to initiate forcing Pressurizer Sprays in accordance with OP 2204, Load Changes, Attachment 10, Forcing Pressurizer Sprays.
0/0 Initiated:
15
Robert L. Cimmino, Jr. (Signature on File) 01/23/2017 Developer Date Reviewed:
 
Will Chesnutt (Signature on File) 01/27/2017 Technical Reviewer Date Approved:
JOB PERFORMANCE MEASURE APPROVAL SHEET JPM
Michael John Cote (Signature on File) 01126/2017 Supervisor, Nuclear Training Date 1
 
==Title:==
Operate the TDAFP using BOP 2541, Appendix 6 (Alt. Path)
JPMNumber:     JPM-S4                                       Revision:       0/0 Initiated:
Robert L. Cimmino, Jr. (Signature on File)                 01/23/2017 Developer                                       Date Reviewed:
Will Chesnutt (Signature on File)                       01/27/2017 Technical Reviewer                                 Date Approved:
Michael John Cote (Signature on File)                     01126/2017 Supervisor, Nuclear Training                             Date 1


==SUMMARY==
==SUMMARY==
OF CHANGES DATE DESCRIPTION REV/CHANGE 01/18/17 rlc Created JPM for 2017 NRC Re-Take Exam 010 2 JPM WORKSHEET Facility:
OF CHANGES DATE                         DESCRIPTION     REV/CHANGE 01/18/17 rlc Created JPM for 2017 NRC Re-Take Exam     010 2
MPUnit2 Examinee:
 
JPMNumber:
JPM WORKSHEET Facility:     MPUnit2                       Examinee:
JPM-S4 Revision:
JPMNumber:                       JPM-S4                               Revision:
0/0 ----Task Title: Operate the TDAFP using EOP 2541, Appendix 6 (Alt. Path) System: Auxiliary Feed Water Time Critical Task: DYES Validated Time (minutes):
                                                                                    - -0/0 Task
15 ------Task Number(s):
 
061-01-076 Applicable To: SRO x STA RO X PEO ---KIA Number: 061/A2.04 KIA Rating: 3.4/3.8 --------Method of Testing: Simulated Performance:
==Title:==
Actual Performance:
Operate the TDAFP using EOP 2541, Appendix 6 (Alt. Path)
x Location:
System:             Auxiliary Feed Water Time Critical Task:                   DYES       ~NO Validated Time (minutes):
Classroom:
Task Number(s):                         061-01-076 Applicable To:               SRO       x         STA                     RO
Simulator:
                                                                                  -X- -         PEO KIA Number:               061/A2.04             KIA Rating:
x In-Plant:
                                                                - - -3.4/3.8 Method of Testing:         Simulated Performance:                                   Actual Performance:           x Location:                   Classroom:                           Simulator:       x                 In-Plant:
Task Standards:
Task Standards:                 The examinee will utilize EOP 2541, Appendix 6 to start up the TDAFP, place it in service feeding both SGs, then respond to a trip of the pump and return it to service feeding both SGs.
The examinee will utilize EOP 2541, Appendix 6 to start up the TDAFP, place it in service feeding both SGs, then respond to a trip of the pump and return it to service feeding both SGs. Required Materials: (procedures, equipment, etc.) General  
Required Materials:             1. EOP 2541, Appendix 6, "TDAFW Pump Normal Startup" (procedures, equipment, etc.)
: 2. EOP 2541, Appendix 7, "TDAFW Pump Abnormal Startup."
General  


==References:==
==References:==
: 1. EOP 2541, Appendix 6, "TDAFW Pump Normal Startup" 2. EOP 2541, Appendix 7, "TDAFW Pump Abnormal Startup." EOP 2541, Appendix 6, "TDAFW Pump Normal Startup" *** READ TO THE EXAMINEE *** I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied.
EOP 2541, Appendix 6, "TDAFW Pump Normal Startup"
With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
                                        *** READ TO THE EXAMINEE ***
3 JPM WORKSHEET JPMNumber:
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
JPM-S4 Revision:
3
0/0 Initial Conditions:
 
Initiating Cues: Simulator Requirements:
JPM WORKSHEET JPMNumber:                     JPM-S4                         Revision:       0/0 Initial Conditions:           1. The plant tripped from 100% power due to a loss of condenser vacuum.
: 1. The plant tripped from 100% power due to a loss of condenser vacuum. 2. All plant systems and components responded as designed on the trip. 3. EOP 2525, "Standard Post Trip Actions", were in progress when the "B" AFW pump tripped on overload.
: 2. All plant systems and components responded as designed on the trip.
: 1. You are the Balance Of Plant (BOP) operator.
: 3. EOP 2525, "Standard Post Trip Actions", were in progress when the "B" AFW pump tripped on overload.
: 2. As the BOP, complete step 7a. RNO actions to place the TDAFW pump in service. Initialize the simulator to the following conditions:
Initiating Cues:               1. You are the Balance Of Plant (BOP) operator.
: 2. As the BOP, complete step 7a. RNO actions to place the TDAFW pump in service.
Simulator Requirements:        Initialize the simulator to the following conditions:
: 1. Mode 3 with a plant trip due to loss of condenser vacuum (FW01/FW33).
: 1. Mode 3 with a plant trip due to loss of condenser vacuum (FW01/FW33).
: 2. Place alarms in "silence" and perform all EOP 2525 Immediate Actions, including setting up AFW to feed both SGs using the two electric pumps. 3. Trip the "B" AFW pump (FW20B) but do not start the TDAFP. 4. FREEZE the simulator until examinee is ready to take the watch. 5. Set up the following IO/Malfunctions to simulate TDAFP overspeed trip: a. BT-29; IO FWSI-4194A to 4500 rpm, no Ramp, auto Delete in 1 sec. b. BT-29; FW20C, no Ramp, no auto Delete. 6. Be prepared to delete FW20C when the examinee directs a PEO to locally reset the overspeed trip. ****NOTES TO TASK PERFORMANCE EVALUATOR****
: 2. Place alarms in "silence" and perform all EOP 2525 Immediate Actions, including setting up AFW to feed both SGs using the two electric pumps.
: 3. Trip the "B" AFW pump (FW20B) but do not start the TDAFP.
: 4. FREEZE the simulator until examinee is ready to take the watch.
: 5. Set up the following IO/Malfunctions to simulate TDAFP overspeed trip:
: a. BT-29; IO FWSI-4194A to 4500 rpm, no Ramp, auto Delete in 1 sec.
: b. BT-29; FW20C, no Ramp, no auto Delete.
: 6. Be prepared to delete FW20C when the examinee directs a PEO to locally reset the overspeed trip.
                  ****NOTES TO TASK PERFORMANCE EVALUATOR****
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance ofthis JPM (in-plant only). 4 PERFORMANCE INFORMATION JPM Number: JPM-S4 Revision:
: 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
0/0 Task Title: Operate the TDAFP using EOP 2541, Appendix 6 (Alt. Path) STARTTIME: STEP Performance:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance ofthis JPM (in-plant only).
Standard:
4
Critical:
 
Grade #1 EOP 2525 2 Standard Post Tri(! Actions so uo RESPONSE NOT OBTAINED a.1 RESTORE level to between 40% to 70% in Examinee notes the RNO action and refers to at least ONE steam generator using ANY of Appendix 6, "TDAFW Pump Normal Startup".
PERFORMANCE INFORMATION JPM Number:         JPM-S4
__::_:=-=-.::;,__:_::__~~~~~~~~~~~~~~~
Revision:     0/0 Task
 
==Title:==
Operate the TDAFP using EOP 2541, Appendix 6 (Alt. Path)
STARTTIME:   ~~~-
STEP Performance:                                         Standard:                                           Critical:       Grade
#1 EOP 2525 2 Standard Post Tri(! Actions                                                                   YON~          so uo RESPONSE NOT OBTAINED a.1 RESTORE level to between 40% to 70% in           Examinee notes the RNO action and refers to at least ONE steam generator using ANY of       Appendix 6, "TDAFW Pump Normal Startup".
the following:
the following:
* Main feedwater
* Main feedwater
* Motor-driven auxiliary feedwater pump
* Motor- driven auxiliary feedwater pump
* TDAFW Pump. Refer To Appendix 6, "TDAFW Pump Normal Startup."
* TDAFW Pump. Refer To Appendix 6, "TDAFW Pump Normal Startup."
* TDAFW Pump. Refer To Appendix 7, "TDAFW Pump Abnormal Startup." Cue: Comments:
* TDAFW Pump. Refer To Appendix 7, "TDAFW Pump Abnormal Startup."
Appendix 7 may also be used as it contains all the necessary steps of Appendix 6. However, Appendix 7 contains several steps that are beyond the scope of the given event that would be considered "NIA". STEP Performance:
Cue:
Standard:
Comments: Appendix 7 may also be used as it contains all the necessary steps of Appendix 6. However, Appendix 7 contains several steps that are beyond the scope of the given event that would be considered "NIA".
Critical:
STEP Performance:                                         Standard:                                           Critical:       Grade
Grade #2 EOP 2541 2 A(!(!endix 6 2 TDAFWPuml!
#2 EOP 2541 2 A(!(!endix 62 TDAFWPuml!                                                                     YON~          so uo Normal Startul!
so uo Normal Startul! 1. IF a SBO event has occurred OR DC Bus Exarninee recognizes a Station Blackout event has 201B is not energized, Go To Appendix not occurred and the step is NI A. 7, "TDAFW Pump Abnormal Operation" Cue: Comments:
: 1. IF a SBO event has occurred OR DC Bus             Exarninee recognizes a Station Blackout event has 201B is not energized, Go To Appendix           not occurred and the step is NIA.
5 PERFORMANCE INFORMATION JPM Number:
7, "TDAFW Pump Abnormal Operation" Cue:
Revision:
Comments:
0/0 Task Title:
5
the TDAFP using EOP 2541, Appendix 6 (Alt. Path) STEP Performance:
 
Standard:
PERFORMANCE INFORMATION JPM Number:       ....:JP::..:::....:M.:..::.....:-S:....:4~--------------- Revision:         0/0 Task
Critical:
 
Grade #3 CAUTION so uo 1. Operation of the TDAFW pump below Examinee reads and acknowledges the caution. 1400 rpm or above 4200 rpm will exceed the governor speed control range. 2. Opening SV-4188 too quickly could overspeed the TDAFP. Cue: Comments:
==Title:==
STEP Performance:
O~rate  the TDAFP using EOP 2541, Appendix 6 (Alt. Path)
Standard:
STEP Performance:                                       Standard:                                       Critical: Grade
Critical:
#3                   CAUTION                                                                           YON~      so uo
Grade #4 2. Slowly OPEN SV-4188, TDAFP steam Examinee opens the TDAFP steam supply valve, so uo valve. by manipulating C-05 control switch SV-4188 and observes TDAFP speed rising. Cue: BOOTH: Verify FW20C actuates when TDAFP speed exceeds 500 rpm and be prepared to delete FW20C when the examinee directs a PEO to locally reset the overspeed trip. Comments:
: 1. Operation of the TDAFW pump below           Examinee reads and acknowledges the caution.
Opening SV-4188 is the only critical part to this step. When the TDAFP speed rises above 500 rpm, the IO and malfunctions will trigger to simulate an overspeed trip. 6 PERFORMANCE INFORMATION JPM Number: JPM-84 Revision:
1400 rpm or above 4200 rpm will exceed the governor speed control range.
0/0 Task Title: Operate the TDAF].>_us_!ng_EOP 2541, Appendix 6 (Alt. Path} STEP Performance:
: 2. Opening SV-4188 too quickly could overspeed the TDAFP.
Standard:
Cue:
Critical:
Comments:
Grade #5 Examinee recognizes the TDAFP has tripped (on Y[SJ NO so uo CONTINGENCY ACTIONS overspeed) and begins Contingency Actions: 2.1 IF the TDAFW pump trips on overspeed, a. Adjusts governor speed to ensure at minimum. PERFORM the following: (Examinee may state governor speed is already a. ADJUST the turbine governor to at minimum or have a PEO check it locally).
STEP Performance:                                       Standard:                                       Critical: Grade
minimum speed. b. ENSURE MS-464,"TERRY TURBINE b. Closes steam supply valve operator to AUX FEED PUMP STEAM SUPPLY" MS-464 using SV-4188 until both green is closed. lights are lit (top one is already lit). c. OPEN MS-436, "LS-4590 c. Instructs PEO to perform step "2.lc.". INSTRUMENT DRAIN." d. Instructs PEO to perform step "2.1 d.". d. Slowly OPEN MS-447, "LS-4590 INSTRUMENT BACKUP DRAIN." e. Notes alarm window "AUX FW TURB e. ENSURE alarm window "AUX FW STEAM LINE WATER LEVEL HI" is clear. TURB STEAM LINE WATER LEVEL (A-14, COS). HI" is clear. (A-14, COS) f. Instructs PEO to perform step "2.lf.". f. WHEN the condensate has drained from Instructs PEO to perform step "2.lg.". the steam line drip pocket, CLOSE g. BOTH MS-436 and MS-447. Examinee resets annunciator C-05/C-15 when ENSURE that the TDAFW pump it clears. g. overspeed trip mechanical latch is reset. h. When the PEO reports all required steps are h. Go To Step 2. completed, the examinee proceeds to step "2." to restart the TDAFP. Cue: BOOTH: Monitor for and reset alarms on all panels except C-05. BOOTH: When a PEO is directed to perform step 2.lg local action, wait a couple minutes and delete the malfunction "FW20C". Examiner:
#4 2. Slowly OPEN SV-4188, TDAFP steam               Examinee opens the TDAFP steam supply valve,   Y~NO      so uo valve.                                         by manipulating C-05 control switch SV-4188 and observes TDAFP speed rising.
Closing SV-4188 to allow the overspeed trip mechanism to be reset locally is the only critical step. When the overspeed trip is reset locally, the overspeed trip alarm on C-05 (C-15) will reset. .If the US is performing communications with the PEO, then at this time inform the examinee that the PEO reports completing steps "c, d, f and g" and that all local conditions appear normal for the TDAFP. Comments:
Cue:
Annunciator C-15 on C-05 will clear when the TDAFP overspeed trip mechanism is reset locally. 7 PERFORMANCE INFORMATION JPMNumber:
BOOTH: Verify FW20C actuates when TDAFP speed exceeds 500 rpm and be prepared to delete FW20C when the examinee directs a PEO to locally reset the overspeed trip.
JPM-84 Revision:
Comments: Opening SV-4188 is the only critical part to this step.
0/0 Task Title: Operate the TDAFP using EOP 2541, Appendix 6 (Alt. Path) STEP Performance:
When the TDAFP speed rises above 500 rpm, the IO and malfunctions will trigger to simulate an overspeed trip.
Standard:
6
Critical:
 
Grade #6 2. Slowly OPEN SV-4188, TDAFP steam Examinee operates SV-4188 on C-05 and raises YIZ] ND so uo valve. TDAFP speed. Cue: Comments:
PERFORMANCE INFORMATION JPM Number:       JPM-84                                                                 Revision: 0/0 Task
STEP Performance:
 
Standard:
==Title:==
Critical:
Operate the TDAF].>_us_!ng_EOP 2541, Appendix 6 (Alt. Path}
Grade #7 CAUTION Examinee reads and acknowledges the caution. YD NIZ] so uo Failure to perform TDAFW pump warmup can cause an overspeed trip due to condensate in the steam line or a sluggish governor speed control. Cue: Comments:
STEP Performance:                                         Standard:                                             Critical:         Grade
STEP Performance:
#5 CONTINGENCY ACTIONS Examinee recognizes the TDAFP has tripped (on         Y[SJ NO         so uo overspeed) and begins Contingency Actions:
Standard:
2.1 IF the TDAFW pump trips on overspeed,           a. Adjusts governor speed to ensure at minimum.
Critical:
PERFORM the following:                             (Examinee may state governor speed is already
Grade #8 3. ADJUST the TDAFW pump "SPD CNTL" Examinee adjusts governor speed on C-05 to YD NIZ] so uo switch to maintain minimum governor speed. maintain minimum speed of approximately 1400 rpm. Cue: Comments:
: a. ADJUST the turbine governor to                   at minimum or have a PEO check it locally).
The governor is already at minimum speed so the step is effectively NIA. STEP Performance:
minimum speed.
Standard:
: b. ENSURE MS-464,"TERRY TURBINE               b. Closes steam supply valve operator to AUX FEED PUMP STEAM SUPPLY"                     MS-464 using SV-4188 until both green is closed.                                       lights are lit (top one is already lit).
Critical:
: c. OPEN MS-436, "LS-4590                       c. Instructs PEO to perform step "2.lc.".
Grade #9 4. WHEN TDAFW pump parameters have Examinee notes parameters are stable and raises YIZ] ND so uo stabilized, RAISE the "SPD CNTL" switch TDAFP speed until a rise in Auxiliary Feedwater to establish feed flow. flow is noted to both S/Gs on C-05. Cue: Comments:
INSTRUMENT DRAIN."
: d. Instructs PEO to perform step "2.1 d.".
: d. Slowly OPEN MS-447, "LS-4590 INSTRUMENT BACKUP DRAIN."                   e. Notes alarm window "AUX FW TURB
: e. ENSURE alarm window "AUX FW                     STEAM LINE WATER LEVEL HI" is clear.
TURB STEAM LINE WATER LEVEL                     (A-14, COS).
HI" is clear. (A-14, COS)                   f. Instructs PEO to perform step "2.lf.".
: f. WHEN the condensate has drained from the steam line drip pocket, CLOSE          g. Instructs PEO to perform step "2.lg.".
BOTH MS-436 and MS-447.                         Examinee resets annunciator C-05/C-15 when
: g. ENSURE that the TDAFW pump                       it clears.
overspeed trip mechanical latch is reset. h. When the PEO reports all required steps are
: h. Go To Step 2.                                   completed, the examinee proceeds to step "2."
to restart the TDAFP.
Cue:
BOOTH: Monitor for and reset alarms on all panels except C-05.
BOOTH: When a PEO is directed to perform step 2.lg local action, wait a couple minutes and delete the malfunction "FW20C".
Examiner: Closing SV-4188 to allow the overspeed trip mechanism to be reset locally is the only critical step.
When the overspeed trip is reset locally, the overspeed trip alarm on C-05 (C-15) will reset.
    .If the US is performing communications with the PEO, then at this time inform the examinee that the PEO reports completing steps "c, d, f and g" and that all local conditions appear normal for the TDAFP.
Comments: Annunciator C-15 on C-05 will clear when the TDAFP overspeed trip mechanism is reset locally.
7
 
PERFORMANCE INFORMATION JPMNumber:         JPM-84                                                         Revision:   0/0 Task
 
==Title:==
Operate the TDAFP using EOP 2541, Appendix 6 (Alt. Path)
STEP Performance:                                     Standard:                                           Critical:   Grade
#6 2. Slowly OPEN SV-4188, TDAFP steam valve.
Examinee operates SV-4188 on C-05 and raises       YIZ] ND   so uo TDAFP speed.
Cue:
Comments:
STEP Performance:                                     Standard:                                           Critical:   Grade
#7                   CAUTION                       Examinee reads and acknowledges the caution.       YD NIZ]   so uo Failure to perform TDAFW pump warmup can cause an overspeed trip due to condensate in the steam line or a sluggish governor speed control.
Cue:
Comments:
STEP Performance:                                     Standard:                                           Critical:   Grade
#8 3. ADJUST the TDAFW pump "SPD CNTL"             Examinee adjusts governor speed on C-05 to         YD NIZ]   so uo switch to maintain minimum governor speed. maintain minimum speed of approximately 1400 rpm.
Cue:
Comments: The governor is already at minimum speed so the step is effectively NIA.
STEP Performance:                                     Standard:                                           Critical:   Grade
#9 4. WHEN TDAFW pump parameters have               Examinee notes parameters are stable and raises   YIZ] ND   so uo stabilized, RAISE the "SPD CNTL" switch     TDAFP speed until a rise in Auxiliary Feedwater to establish feed flow.                     flow is noted to both S/Gs on C-05.
Cue:
Comments:
When the TDAFP discharge pressure exceeds S/G pressure and AFW flow to both S/Gs begins to rise, the JPM is complete.
When the TDAFP discharge pressure exceeds S/G pressure and AFW flow to both S/Gs begins to rise, the JPM is complete.
TERMINATION CUE: The evaluation for this JPM is concluded.
TERMINATION CUE: The evaluation for this JPM is concluded.
STOP TIME: 8 VERIFICATION OF JPM COMPLETION JPMNumber:
STOP TIME:
JPM-S4 Revision:
8
0/0 Date Performed:
 
Student: For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
VERIFICATION OF JPM COMPLETION JPMNumber:                               JPM-S4                                       Revision:         0/0 Date Performed:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. EVALUATION SECTION: Time Critical Task? D Yes lZ! No Validated Time (minutes):
Student:
I 15 Actual Time to Complete (minutes):
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
I Work Practice Performance:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
D SAT D UNSAT Operator Fundamentals:
EVALUATION SECTION:
D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question # 1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:
Time Critical Task?                                 D   Yes   lZ! No Validated Time (minutes):                           Actual Time to Complete (minutes):
I    15                                                            I Work Practice Performance:                         D   SAT             D   UNSAT Operator Fundamentals:                             D   SAT             D   UNSAT JPM Question Portion Overall [NLO only]:           D   SAT             D UNSAT               D   N/A Attached Question # 1       D   SAT             D UNSAT Attached Question #2       D   SAT             D UNSAT Overall Result of JPM:                             D   SAT             D   UNSAT Evaluator:
Print I Sign Areas for Improvement I Comments:
Print I Sign Areas for Improvement I Comments:
9 JPMNumber:
9
Initial Conditions:
 
Initiating Cues: STUDENT HANDOUT JPM-S4 Revision:
STUDENT HANDOUT JPMNumber:                    JPM-S4                             Revision:         0/0 Initial Conditions: 1. The plant tripped from 100% power due to a loss of condenser vacuum.
0/0 1. The plant tripped from 100% power due to a loss of condenser vacuum. 2. All plant systems and components responded as designed on the trip. 3. EOP 2525, "Standard Post Trip Actions", were in progress when the "B'' AFW pump tripped on overload.
: 2. All plant systems and components responded as designed on the trip.
: 1. You are the Balance Of Plant (BOP) operator.
: 3. EOP 2525, "Standard Post Trip Actions", were in progress when the "B''
: 2. As the BOP, complete step 7a. RNO actions to place the TDAFW pump in service. 10 JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: Restoring from Containment Spray fuadvertent Actuation JPMNumber:
AFW pump tripped on overload.
JPM-S5 Revision:
Initiating Cues:   1. You are the Balance Of Plant (BOP) operator.
0/0 fuitiated:
: 2. As the BOP, complete step 7a. RNO actions to place the TDAFW pump in service.
Robert L. Cimmino, Jr. (Signature on File) 01/23/2017 Developer Date Reviewed:
10
Will Chesnutt (Signature on File) 0112712017 Technical Reviewer Date Approved:
 
Michael John Cote (Signature on File) 01/26/2017 Supervisor, Nuclear Training Date 1
JOB PERFORMANCE MEASURE APPROVAL SHEET JPM
 
==Title:==
Restoring from Containment Spray fuadvertent Actuation JPMNumber:     JPM-S5                                         Revision:       0/0 fuitiated:
Robert L. Cimmino, Jr. (Signature on File)                   01/23/2017 Developer                                       Date Reviewed:
Will Chesnutt (Signature on File)                       0112712017 Technical Reviewer                                   Date Approved:
Michael John Cote (Signature on File)                     01/26/2017 Supervisor, Nuclear Training                             Date 1


==SUMMARY==
==SUMMARY==
OF CHANGES DATE DESCRIPTION REV/CHANGE 01 /13/17 RLC Created JPM-S5 for NRC 2017 Exam Re-Take 010 2 JPM WORKSHEET Facility:
OF CHANGES DATE                         DESCRIPTION         REV/CHANGE 01 /13/17 RLC Created JPM-S5 for NRC 2017 Exam Re-Take     010 2
MPUnit2 Examinee:
 
JPMNumber:
JPM WORKSHEET Facility:     MPUnit2                       Examinee:
JPM-S5 Revision:
JPMNumber:                       JPM-S5                               Revision:
0/0 ---Task Title: Restore From Inadvertent Containment Spray Actuation System: Containment Spray and ESAS Time Critical Task: DYES C8J NO Validated Time (minutes):
                                                                                    - 0/0 Task
15 TaskNumber(s): (NUTIMS) 026-01-035 Applicable To: SRO STA RO X PEO ---------K/ANumber:
 
026/A4.05 K/ARating:
==Title:==
3.5/3.5 --------Method of Testing: Simulated Performance:
Restore From Inadvertent Containment Spray Actuation System:             Containment Spray and ESAS Time Critical Task:                   DYES       C8J NO Validated Time (minutes):               15 TaskNumber(s):                   (NUTIMS) 026-01-035 Applicable To:               SRO - - -           STA                      RO -X- -           PEO - - -
Actual Performance:
K/ANumber:                 026/A4.05             K/ARating:
x Location:
                                                                  - - -3.5/3.5 Method of Testing:         Simulated Performance:                                   Actual Performance:           x Location:                   Classroom:                           Simulator:       x                 In-Plant:
Classroom:
Task Standards:               The examinee will reset ESAS and restore Facility 1 Containment Spray to its normal, at power configuration, following an inadvertent CSAS actuation, using AOP 2571, Inadvertent ESFAS Actuation.
Simulator:
Required Materials:             Provide the examinee with a copy of AOP 2571, Inadvertent ESFAS Actuation, (procedures, equipment, etc.)   with all applicable steps up to, and including, step 3.2 marked as "NIA".
x In-Plant:
General  
Task Standards:
The examinee will reset ESAS and restore Facility 1 Containment Spray to its normal, at power configuration, following an inadvertent CSAS actuation, using AOP 2571, Inadvertent ESFAS Actuation.
Required Materials: (procedures, equipment, etc.) General  


==References:==
==References:==
AOP 2571, Inadvertent ESFAS Actuation.
                                        *** READ TO THE EXAMINEE ***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
3


Provide the examinee with a copy of AOP 2571, Inadvertent ESFAS Actuation, with all applicable steps up to, and including, step 3.2 marked as "NIA". AOP 2571, Inadvertent ESFAS Actuation.
JPM WORKSHEET JPMNumber:                   JPM-S5                         Revision:       0/0 Initial Conditions:           1. Plant power is 100%, steady state, when an inadvertent Containment Spray actuation occurred on Facility 1 only.
*** READ TO THE EXAMINEE *** I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied.
: 2. The actuation has been deemed inadvertent because all plant conditions are normal and none of the Sensor Cabinet bistables have been triggered.
With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
3 JPM WORKSHEET JPMNumber:
JPM-S5 Revision:
0/0 Initial Conditions:
Initiating Cues: Simulator Requirements:
: 1. Plant power is 100%, steady state, when an inadvertent Containment Spray actuation occurred on Facility 1 only. 2. The actuation has been deemed inadvertent because all plant conditions are normal and none of the Sensor Cabinet bistables have been triggered.
: 3. I&C and all applicable personnel have been notified.
: 3. I&C and all applicable personnel have been notified.
: 4. The crew has entered AOP 2571, Inadvertent ESF AS Actuation, and has completed steps 3.1 and 3.2. 1. You are the Reactor Operator (RO). 2. The US has instructed you to restore from the inadvertent CSAS using AOP 2571, Inadvertent ESFAS Actuation, starting at step 3.3. 1. Reset the simulator to any full power, stable IC and go to RUN. 2. Trigger malfunction ES02E, SPURIOUS F AC 1 CSAS SIGNAL 3. Wait for the CTMT Sump alarm (C-06/7, BA-21) to come in. 4. Then, acknowledge all alarms and place the simulator in FREEZE until the examinee is ready to take the watch. NOTE: The simulator triggers an inadvertent CSAS by directly stimulating the ESAS Actuation Modules, and does not send a signal through the Sensor Modules. Therefore, the sensor bistables will not be triggered and will not have any red lights energized that need to be reset. This more precisely simulates an ESAS circuit failure based on OE. ****NOTES TO TASK PERFORMANCE EVALUATOR****
: 4. The crew has entered AOP 2571, Inadvertent ESF AS Actuation, and has completed steps 3.1 and 3.2.
Initiating Cues:              1. You are the Reactor Operator (RO).
: 2. The US has instructed you to restore from the inadvertent CSAS using AOP 2571, Inadvertent ESFAS Actuation, starting at step 3.3.
Simulator Requirements:      1. Reset the simulator to any full power, stable IC and go to RUN.
: 2. Trigger malfunction ES02E, SPURIOUS F AC 1 CSAS SIGNAL
: 3. Wait for the CTMT Sump alarm (C-06/7, BA-21) to come in.
: 4. Then, acknowledge all alarms and place the simulator in FREEZE until the examinee is ready to take the watch.
NOTE: The simulator triggers an inadvertent CSAS by directly stimulating the ESAS Actuation Modules, and does not send a signal through the Sensor Modules. Therefore, the sensor bistables will not be triggered and will not have any red lights energized that need to be reset. This more precisely simulates an ESAS circuit failure based on OE.
                  ****NOTES TO TASK PERFORMANCE EVALUATOR****
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance ofthis JPM (in-plant only). 4 PERFORMANCE INFORMATION JPM Number: JPM-SS Revision:
: 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
0/0 Task Title: Restoring from Spray Inadvertent Actuation STARTTThlE:  
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance ofthis JPM (in-plant only).
----STEP Performance:
4
Standard:
 
Critical:
PERFORMANCE INFORMATION JPM Number:       JPM-SS
Grade #1 AOP 2571 2 Inadvertent ESF AS Actuation YO Ni:8J so uo 3.0 Inadvertent CSAS Actuation 3.1 IF an inadvertent bus 24C UV 3 .1. actuation Examinee recognizes step 3.1 is "NI A" or already has occurred, Go To AOP 2502C, "Loss of completed.
                            --=-=:....::..:..::~~~~~~~~~~~~~~~~~
Vital 4.16 KV Bus 24C." Cue: BOOTH: When the examinee is ready to take the watch place the simulator in RUN. Comments:
Revision:         0/0 Task
It is acceptable for the examinee to briefly review the control boards and AOP 2571 prior to taking the watch. STEP Performance:
 
Standard:
==Title:==
Critical:
Restoring from _!;~mtainment Spray Inadvertent Actuation STARTTThlE: - - - -
Grade #2 3.2 IF an inadvertent bus 24D UV 3.2. actuation Examinee recognizes step 3.2 is "NIA" or already YO Ni:8J so uo has occurred, Go To AOP 2502D, "Loss of completed.
STEP Performance:                                       Standard:                                               Critical:     Grade
Vital 4.16 KV Bus 24D." Cue: Comments:
#1 AOP 2571 2 Inadvertent ESF AS Actuation                                                                   YO     Ni:8J   so uo 3.0 Inadvertent CSAS Actuation 3.1 IF an inadvertent bus 24C UV 3 .1. actuation Examinee recognizes step 3.1 is "NI A" or already has occurred, Go To AOP 2502C, "Loss of     completed.
STEP Performance:
Vital 4.16 KV Bus 24C."
Standard:
Cue: BOOTH: When the examinee is ready to take the watch place the simulator in RUN.
Critical:
Comments: It is acceptable for the examinee to briefly review the control boards and AOP 2571 prior to taking the watch.
Grade #3 CAUTION Examinee reads and acknowledges the Caution YO Ni:8J so uo When an ESAS signal has been overridden by use of the equipment handswitch, then future ESAS signals will not be processed for that equipment until the ESAS modules have been reset. Cue: Comments:
STEP Performance:                                       Standard:                                               Critical:     Grade
If the examinee chooses to make the US aware of the Caution, acknowledge any reports. 5 PERFORMANCE INFORMATION JPMNumber:
#2 3.2 IF an inadvertent bus 24D UV 3.2. actuation     Examinee recognizes step 3.2 is "NIA" or already     YO Ni:8J       so uo has occurred, Go To AOP 2502D, "Loss of       completed.
JPM-SS Revision:
Vital 4.16 KV Bus 24D."
0/0 Task Title: Restoring from Containment Spray Inadvertent Actuation STEP Performance:
Cue:
Standard:
Comments:
Critical:
STEP Performance:                                       Standard:                                               Critical:     Grade
Grade #4 3.3 IF an inadvertent containment spray Examinee notes the step applies and performs the actuation has occurred, PERFORM the following:
#3                     CAUTION                         Examinee reads and acknowledges the Caution           YO     Ni:8J   so uo When an ESAS signal has been overridden by use of the equipment handswitch, then future ESAS signals will not be processed for that equipment until the ESAS modules have been reset.
Cue:
Comments: If the examinee chooses to make the US aware of the Caution, acknowledge any reports.
5
 
PERFORMANCE INFORMATION JPMNumber:         JPM-SS                                                             Revision:       0/0 Task
 
==Title:==
Restoring from Containment Spray Inadvertent Actuation STEP Performance:                                       Standard:                                                 Critical:           Grade
#4 3.3 IF an inadvertent containment spray             Examinee notes the step applies and performs the actuation has occurred, PERFORM the           following:
following as required:
following as required:
: a. CHECK Containment pressure less than a. Verifies CTMT pressure on C-01 < 9 .48 psig. YD N[2] so uo 9.48 psig. b. Overrides and stops the "A" CS Pump by b. OVERRIDE CSAS start signals and taking the handswitch on C-01 to the "START" Y[2] ND so uo STOP containment spray pumps.(C-01) and then the "STOP" position (more than one c. OVERRIDE CSAS open signals and attempt is acceptable).
: a. CHECK Containment pressure less than         a. Verifies CTMT pressure on C-01 < 9 .48 psig.         YD N[2]           so uo 9.48 psig.                                 b. Overrides and stops the "A" CS Pump by
CLOSE the following valves:(C-
: b. OVERRIDE CSAS start signals and                 taking the handswitch on C-01 to the "START"         Y[2] ND           so uo STOP containment spray pumps.(C- 01)         and then the "STOP" position (more than one
: 01) c. Overrides and closes CS-4. lA, contaimnent
: c. OVERRIDE CSAS open signals and                 attempt is acceptable).
* CS-4. lA, containment spray header spray header "A" isolation valve by taking the YD N[2] so uo "A" isolation handswitch to "OPEN" and then "CLOSED" on
CLOSE the following valves:(C- 01)
* CS-4. lB, containment spray header C-01 (more than one attempt is acceptable). "B" isolation
: c. Overrides and closes CS-4. lA, contaimnent
: d. Proceeds to Section 7 .0, "Inadvertent CSAS Y0Nl:2J so uo d. Go To Section 7.0, "Inadvertent CSAS Actuation." Actuation." Cue: Comments:
* CS-4. lA, containment spray header           spray header "A" isolation valve by taking the     YD N[2]           so uo "A" isolation handswitch to "OPEN" and then "CLOSED" on
Stopping of the "A" CTMT Spray Pump is the only step that is critical.
* CS-4. lB, containment spray header           C-01 (more than one attempt is acceptable).
                "B" isolation
: d. Go To Section 7.0, "Inadvertent CSAS         d. Proceeds to Section 7 .0, "Inadvertent CSAS         Y0Nl:2J            so uo Actuation."
Actuation."
Cue:
Comments: Stopping of the "A" CTMT Spray Pump is the only step that is critical.
Examinee may state (per the Initiating Cue) that because only Facility 1 CSAS triggered, no action is required for the Facility 2 CTMT Spray components.
Examinee may state (per the Initiating Cue) that because only Facility 1 CSAS triggered, no action is required for the Facility 2 CTMT Spray components.
STEP Perfonnance:
STEP Perfonnance:                                       Standard:                                                 Critical:           Grade
Standard:
#5 AOP 2571 2 Inadvertent ESFAS Actuation                                                                     YD N[2]           so uo 7.0 Inadvertent CSAS Actuation                     Examinee goes to Section 7.0 reads step 7.1 and 7.1 Refer To Attachment 2, "Resetting ESAS,"       then proceeds to Attachment 2, Section 2.0 Section 2.0, "Resetting CSAS," and             "Resetting CSAS," for resetting the CSAS.
Critical:
ATTEMPT to reset CSAS.
Grade #5 AOP 2571 2 Inadvertent ESFAS Actuation YD N[2] so uo 7.0 Inadvertent CSAS Actuation Examinee goes to Section 7.0 reads step 7.1 and 7.1 Refer To Attachment 2, "Resetting ESAS," then proceeds to Attachment 2, Section 2.0 Section 2.0, "Resetting CSAS," and "Resetting CSAS," for resetting the CSAS. ATTEMPT to reset CSAS. Cue: Comments:
Cue:
6 PERFORMANCE INFORMATION JPM Number: JPM-SS Revision:
Comments:
0/0 Task Title: Restoring from Containment Spray Inadvertent Actuation STEP Performance:
6
Standard:
 
Critical:
PERFORMANCE INFORMATION JPM Number:       JPM-SS                                                               Revision:         0/0 Task
Grade #6 Attachment 2 2 Section 2.0 Resetting CSAS Examinee refers to Attachment 2, Section 2.0, so uo 2.1 PRESS to reset the following bistable Resetting CSAS. Examinee proceeds to ESAS and module "TRIP" lights: ensures the trip lights on the following bistables are * "CTM PRESSURE CSAS BISTABLE reset: BAl 02" (Sensor Cabinet A)
 
* Sensor Cabinet A, bistable BAl 02 * "CTM PRESSURE CSAS BISTABLE
==Title:==
Restoring from Containment Spray Inadvertent Actuation STEP Performance:                                       Standard:                                                     Critical:     Grade
#6 Attachment 2 2 Section 2.0 Resetting CSAS           Examinee refers to Attachment 2, Section 2.0,             YON~          so uo 2.1 PRESS to reset the following bistable           Resetting CSAS. Examinee proceeds to ESAS and module "TRIP" lights:                         ensures the trip lights on the following bistables are reset:
          * "CTM PRESSURE CSAS BISTABLE BAl 02" (Sensor Cabinet A)
* Sensor Cabinet A, bistable BAl 02
          *   "CTM PRESSURE CSAS BISTABLE
* Sensor Cabinet C, bistable BA302 BA302" (Sensor Cabinet C)
* Sensor Cabinet C, bistable BA302 BA302" (Sensor Cabinet C)
* Sensor Cabinet D, bistable BA402 * "CTM PRESSURE CSAS BISTABLE
* Sensor Cabinet D, bistable BA402
* Sensor Cabinet B, bistable BA202 BA402" (Sensor Cabinet D) Examinee may recognizes the Sensor bistables are * "CTM PRESSURE CSAS BISTABLE not triggered (all "TRIP" lights are de-energized), BA202" (Sensor Cabinet B) as explained by the Initiating Cue, and consider the step "NI A". Cue: Comments:
          *   "CTM PRESSURE CSAS BISTABLE
Although the Initiating Cue stated the Sensor bistables were not triggered by the circuit failure (simulator malfunction), the examinee may still elect to perform the step by pushing each de-energized trip light, just to be reassured it is complete.
* Sensor Cabinet B, bistable BA202 BA402" (Sensor Cabinet D)                 Examinee may recognizes the Sensor bistables are
STEP Performance:
          *   "CTM PRESSURE CSAS BISTABLE               not triggered (all "TRIP" lights are de-energized),
Standard:
BA202" (Sensor Cabinet B)                 as explained by the Initiating Cue, and consider the step "NIA".
Critical:
Cue:
Grade #7 2.2 PRESS "CSAS ACTUATION RESET" Examinee presses the "CSAS ACTUATION so uo (Actuation Cabinet 5). RESET" button on Actuation Cabinet 5. Cue: Comments:
Comments: Although the Initiating Cue stated the Sensor bistables were not triggered by the circuit failure (simulator malfunction), the examinee may still elect to perform the step by pushing each de-energized trip light, just to be reassured it is complete.
7 PERFORMANCE INFORMATION JPM Number: JPM-SS Revision:
STEP Performance:                                       Standard:                                                     Critical:     Grade
0/0 Task Title: Restoring from Containment Spray Inadvertent Actuation STEP Performance:
#7 2.2 PRESS "CSAS ACTUATION RESET"                   Examinee presses the "CSAS ACTUATION                       Y~NO        so uo (Actuation Cabinet 5).                         RESET" button on Actuation Cabinet 5.
Standard:
Cue:
Critical:
Grade #8 2.3 OBSERVE BOTH of the following CSAS Examinee notes the "TRIP" lights on both CSAS YO NIS] so uo actuation module "TRIP" lights Actuation modules on Actuation Cabinet 5, extinguished (Actuation Cabinet 5): AM509 and AM510, are de-energized.
* "CSAS GROUP 1 AM509" * "CSAS GROUP 2 AM51 O" Cue: After the completion of step 2.3, inform the examinee that the JPM is complete.
Comments:
Comments:
If the examinee notes the ATI should be reset, acknowledge and state that another operator will take care of that task. TERMINATION CUE: The evaluation for this JPM is concluded.
7
STOP TIME: ---8 VERIFICATION OF JPM COMPLETION JPMNumber:
 
JPM-SS Revision:
PERFORMANCE INFORMATION JPM Number:      JPM-SS                                                            Revision:          0/0 Task
0/0 Date Performed:
 
Student: For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
==Title:==
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. EVALUATION SECTION: Time Critical Task? D Yes k8'.I No Validated Time (minutes):
Restoring from Containment Spray Inadvertent Actuation STEP Performance:                                      Standard:                                                  Critical:  Grade
I 15 Actual Time to Complete (minutes):
#8  2.3 OBSERVE BOTH of the following CSAS            Examinee notes the "TRIP" lights on both CSAS            YO NIS]    so uo actuation module "TRIP" lights              Actuation modules on Actuation Cabinet 5, extinguished (Actuation Cabinet 5):          AM509 and AM510, are de-energized.
I Work Practice Performance:
          *    "CSAS  GROUP  1 AM509"
D SAT D UNSAT Operator Fundamentals:
          * "CSAS GROUP 2 AM51 O" Cue:
D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question #1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:
After the completion of step 2.3, inform the examinee that the JPM is complete.
Comments:
If the examinee notes the ATI should be reset, acknowledge and state that another operator will take care of that task.
TERMINATION CUE: The evaluation for this JPM is concluded.
STOP TIME: - - -
8
 
VERIFICATION OF JPM COMPLETION JPMNumber:                               JPM-SS                                       Revision:         0/0 Date Performed:
Student:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
EVALUATION SECTION:
Time Critical Task?                                 D   Yes k8'.I No Validated Time (minutes):               15         Actual Time to Complete (minutes):
I                                                                  I Work Practice Performance:                         D   SAT             D   UNSAT Operator Fundamentals:                             D   SAT             D UNSAT JPM Question Portion Overall [NLO only]:           D   SAT             D UNSAT               D   N/A Attached Question #1       D   SAT             D UNSAT Attached Question #2       D   SAT             D UNSAT Overall Result of JPM:                             D   SAT             D UNSAT Evaluator:
Print I Sign Areas for Improvement I Comments:
Print I Sign Areas for Improvement I Comments:
9 JPMNumber:
9
Initial Conditions:
 
Initiating Cues: STUDENT HANDOUT JPM-SS Revision:
STUDENT HANDOUT JPMNumber:                  JPM-SS                                 Revision:         0/0 Initial Conditions: 1. Plant power is 100%, steady state, when an inadvertent Containment Spray actuation occurred on Facility 1 only.
0/0 1. Plant power is 100%, steady state, when an inadvertent Containment Spray actuation occurred on Facility 1 only. 2. The actuation has been deemed inadvertent because all plant conditions are normal and none of the Sensor Cabinet bistables have been triggered.
: 2. The actuation has been deemed inadvertent because all plant conditions are normal and none of the Sensor Cabinet bistables have been triggered.
: 3. I&C and all applicable personnel have been notified.
: 3. I&C and all applicable personnel have been notified.
: 4. The crew has entered AOP 2571, Inadvertent ESF AS Actuation, and has completed steps 3 .1 and 3 .2. 1. You are the Reactor Operator (RO). 2. The US has instructed you to restore from the inadvertent CSAS using AOP 2571, Inadvertent ESFAS Actuation, starting at step 3.3. 10 JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: Unload and Shutdown the "B" EDG (Alt Path) JPMNumber:
: 4. The crew has entered AOP 2571, Inadvertent ESFAS Actuation, and has completed steps 3 .1 and 3 .2.
JPM-S6 (JPM 059) Revision:
Initiating Cues:    1. You are the Reactor Operator (RO).
10 Initiated:
: 2. The US has instructed you to restore from the inadvertent CSAS using AOP 2571, Inadvertent ESFAS Actuation, starting at step 3.3.
Robert L. Cimmino, Jr. (Signature on File) 01/23/2017 Developer Date Reviewed:
10
Will Chesnutt (Signature on File) 01/27/2017 Technical Reviewer Date Approved:
 
Mike J. Cote (Signature on File) 02/01/2017 Supervisor, Nuclear Training Date 1
JOB PERFORMANCE MEASURE APPROVAL SHEET JPM
 
==Title:==
Unload and Shutdown the "B" EDG (Alt Path)
JPMNumber:     JPM-S6 (JPM 059)                           Revision:       10 Initiated:
Robert L. Cimmino, Jr. (Signature on File)             01/23/2017 Developer                                   Date Reviewed:
Will Chesnutt (Signature on File)                   01/27/2017 Technical Reviewer                             Date Approved:
Mike J. Cote (Signature on File)                   02/01/2017 Supervisor, Nuclear Training                         Date 1


==SUMMARY==
==SUMMARY==
OF CHANGES DATE DESCRIPTION REV/CHANGE 06/30/2014 dii Updated Material to new format and procedures 9 01/13/17 rlc Updated Material to new format and procedures and added JPM 10 number designation for 2017 NRC Re-Take Exam 2 JPM WORKSHEET Facility:
OF CHANGES DATE                               DESCRIPTION                         REV/CHANGE 06/30/2014 dii         Updated Material to new format and procedures           9 Updated Material to new format and procedures and added JPM 01/13/17 rlc                                                                  10 number designation for 2017 NRC Re-Take Exam 2
Millstone Unit 2 Examinee:
 
JPMNumber:
JPM WORKSHEET Facility:     Millstone Unit 2               Examinee:
JPM-86 (JPM 059) Revision:
JPMNumber:                 JPM-86 (JPM 059)                           Revision:     10 Task
10 Task Title: Unload and Shutdown the "B" EDG (Alt Path) System: Emergency Diesel Generators Time Critical Task: ( ) YES (X) NO Validated Time (minutes):
 
10 Task Number(s):
==Title:==
NUTIMS 064 01 121 Applicable To: STA RO x PEO SRO ---x KIA Number: ---------3.913.9 064 A4.06 KIA Rating: -------Method of Testing: Simulated Performance:
Unload and Shutdown the "B" EDG (Alt Path)
Actual Performance:
System:             Emergency Diesel Generators Time Critical Task:                   ( ) YES     (X) NO Validated Time (minutes):               10 Task Number(s):                   NUTIMS 064 01 121 Applicable To:               SRO - -   x-         STA                      RO      x           PEO KIA Number:                       A4.06          KIA Rating:            3.913.9
x Location:
                  - -064 ----         ---                       ---       ----
Classroom:
Method of Testing:         Simulated Performance:                                   Actual Performance:           x Location:                   Classroom:                           Simulator:       x                 In-Plant:
Simulator:
Task Standards:                 At the completion of the JPM the examinee, while attempting to unload and secure the "B" EDG, will recognize an electrical fault has occurred that should have tripped the EDG but didn't, then respond by manually tripping the EDG.
x In-Plant:
Required Materials:
Task Standards:
* Simulator with the "B" EDG running paralleled at full load (procedures, equipment, etc.)
At the completion of the JPM the examinee, while attempting to unload and secure the "B" EDG, will recognize an electrical fault has occurred that should have tripped the EDG but didn't, then respond by manually tripping the EDG. Required Materials:  
* MP-PROC-OPS-OP 2346C "B" Emergency Diesel Generator
* (procedures, equipment, etc.) *
* MP-PROC-OPS-ARP 2590F-140 COS D-35 DIESEL GEN 13U DIFFERENTIAL LOCKOUT General  
* General  


==References:==
==References:==
* MP-PROC-OPS-OP 2346C "B" Emergency Diesel Generator
* MP-PROC-OPS-ARP 2590F-140 COS D-35 DIESEL GEN 13U DIFFERENTIAL LOCKOUT
                                        *** READ TO THE EXAMINEE ***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
3


*
JPM WORKSHEET JPMNumber:               JPM-S6 (JPM 059)                   Revision:         10 Initial Conditions:           1. The Plant is stable at 100% power with all conditions normal.
* Simulator with the "B" EDG running paralleled at full load MP-PROC-OPS-OP 2346C "B" Emergency Diesel Generator MP-PROC-OPS-ARP 2590F-140 COS D-35 DIESEL GEN 13U DIFFERENTIAL LOCKOUT MP-PROC-OPS-OP 2346C "B" Emergency Diesel Generator MP-PROC-OPS-ARP 2590F-140 COS D-35 DIESEL GEN 13U DIFFERENTIAL LOCKOUT *** READ TO THE EXAMINEE *** I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied.
: 2. The "B" EDG has been continually running at full load, in parallel with Bus 24D for a surveillance run.
With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
: 3. All data was collected on OP 2346C-002, the Unit Supervisor has completed his review and all data is SAT.
3 JPMNumber:
Initiating Cues:              The Unit Supervisor has directed you to Unload and Secure the "B" EDG in accordance with OP 2346C, "B" Emergency Diesel Generator procedure.
JPM WORKSHEET JPM-S6 (JPM 059) Revision:
Simulator Requirements:
10 Initial Conditions:
* Initialize to any 100% IC with the "B" EDG fully loaded X-Tied to 24D
Initiating Cues: Simulator Requirements:
[Note: IC-139 is saved with all required JPM conditions]
: 1. The Plant is stable at 100% power with all conditions normal. 2. The "B" EDG has been continually running at full load, in parallel with Bus 24D for a surveillance run. 3. All data was collected on OP 2346C-002, the Unit Supervisor has completed his review and all data is SAT. The Unit Supervisor has directed you to Unload and Secure the "B" EDG in accordance with OP 2346C, "B" Emergency Diesel Generator procedure.
* Under EG, insert the following I/O Overrides to prevent the "B" DG MAN START/STOP switch from tripping the "B" DG:
* Initialize to any 100% IC with the "B" EDG fully loaded X-Tied to 24D [Note: IC-139 is saved with all required JPM conditions]
o EGDGH7B15G13U_l - B DIG "Ready to Load" light on; W o EGDGH7B 1SG13U_2 - B DIG "Standby" light off; NW o 06A1A5S34 -B DIG Manual Start/Stop Switch; AUTO
* Under EG, insert the following I/O Overrides to prevent the "B" DG MAN START/STOP switch from tripping the "B" DG: o EGDGH7B15G13U_l  
-B DIG "Ready to Load" light on; W o EGDGH7B 1SG13U _2 -B DIG "Standby" light off; NW o 06A1A5S34 -B DIG Manual Start/Stop Switch; AUTO
* To simulate a fault, create Event 1 with the following:
* To simulate a fault, create Event 1 with the following:
o Trigger C08-D35; [ON], DIESEL GEN 13U DIFFERENTIAL LOCKOUT. o Trigger C08-B36; [ON], DIESEL GEN 13U TROUBLE. o TriggerC08-C31;
o Trigger C08-D35; [ON], DIESEL GEN 13U DIFFERENTIAL LOCKOUT.
[ON], 13U AUTO VOLTAGE REGULATOR SETPOINT NOT 4160 V AC. o I/O EGV2/MTR15G-13U; DG "B" Volts [300 AC_KV, no ramp] o I/O EGA2/MTR15G-13U; DG "B" Amps [600 AC_AMP, no ramp] o I/O EGV AR/MTRl 5G-13U, DIG "B" V ARs [2000 K, no ramp] o I/O EGW-2/MTR15G-13U, DIG "B" Power [300 AC_KW, no ramp] All of the above items must be duplicated to auto delete (return to normal) one second after a second BT is triggered.
o Trigger C08-B36; [ON], DIESEL GEN 13U TROUBLE.
This second BT should be triggered at the time the EDG is manually tripped by the examinee, so the simulator correctly reflects the EDG is no longer operating.  
o TriggerC08-C31; [ON], 13U AUTO VOLTAGE REGULATOR SETPOINT NOT 4160 VAC.
****NOTES TO TASK PERFORMANCE EVALUATOR****
o I/O EGV2/MTR15G-13U; DG "B" Volts [300 AC_KV, no ramp]
o I/O EGA2/MTR15G-13U; DG "B" Amps [600 AC_AMP, no ramp]
o I/O EGVAR/MTRl 5G-13U, DIG "B" V ARs [2000 K, no ramp]
o I/O EGW-2/MTR15G-13U, DIG "B" Power [300 AC_KW, no ramp]
All of the above items must be duplicated to auto delete (return to normal) one second after a second BT is triggered. This second BT should be triggered at the time the EDG is manually tripped by the examinee, so the simulator correctly reflects the EDG is no longer operating.
                ****NOTES TO TASK PERFORMANCE EVALUATOR****
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). 4 PERFORMANCE INFORMATION JPMNumber:
: 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
JPM-S6 (JPM 059) Revision:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
10 Task Title: Unload and Shutdown the "B" EDG (Alt Path) START TIME: ----STEP Performance:
4
Standard:
 
Critical:
PERFORMANCE INFORMATION JPMNumber:             JPM-S6 (JPM 059)                                               Revision:   10 Task
Grade #1 OP 2346Ci "B" Emergency Diesel Generator Examinee reads the initial conditions and proceeds so uo Section 4.6, Unloading and Shutdown of "B" to Section 4.6. DG from Control Room 4.6.1 IF "B" DG has been operated at low load Examinee notes per the Initial Conditions, Step ( <5 0% of full load) for greater than or 4.6.1 is N/As equal to eight hours, Refer To Section 4.5 and LOAD the diesel to between 2,550 and 2,650 kW for at least one hour. Cue: Comments:
 
STEP Performance:
==Title:==
Standard:
Unload and Shutdown the "B" EDG (Alt Path)
Critical:
START TIME: - - - -
Grade #2 NOTE so uo During isochronous mode of operation (i.e., not Examinee reads and N/As the NOTE the EDG is in in unit parallel), generator load is decreased by Unit parallel stopping components powered from applicable buses. 4.6.2 WHEN required DG run time has lapsed Examinee notes per the Initial Conditions, Step OR otherwise directed, ENSURE all 4.6.2 is complete.
STEP Performance:                                       Standard:                                             Critical:   Grade
#1 OP 2346Ci "B" Emergency Diesel Generator           Examinee reads the initial conditions and proceeds   YON~        so uo Section 4.6, Unloading and Shutdown of "B"         to Section 4.6.
DG from Control Room 4.6.1 IF "B" DG has been operated at low load     Examinee notes per the Initial Conditions, Step
(<5 0% of full load) for greater than or   4.6.1 is N/As equal to eight hours, Refer To Section 4.5 and LOAD the diesel to between 2,550 and 2,650 kW for at least one hour.
Cue:
Comments:
STEP Performance:                                       Standard:                                               Critical: Grade
#2 NOTE                                                                                                     YON~        so uo During isochronous mode of operation (i.e., not   Examinee reads and N/As the NOTE the EDG is in in unit parallel), generator load is decreased by Unit parallel stopping components powered from applicable buses.
4.6.2 WHEN required DG run time has lapsed         Examinee notes per the Initial Conditions, Step OR otherwise directed, ENSURE all         4.6.2 is complete.
required data has been recorded on OP 2346C-002.
required data has been recorded on OP 2346C-002.
Cue: Comments:
Cue:
Comments:
OP 2346A-002 was completed and signed off per the Initial Conditions.
OP 2346A-002 was completed and signed off per the Initial Conditions.
5 PERFORMANCE INFORMATION JPMNumber:
5
JPM-S6 ( JPM 059) Revision:
 
10 Task Title: Unload and Shutdown the "B" EDG (Alt Path) STEP Performance:
PERFORMANCE INFORMATION JPMNumber:           JPM-S6 (JPM 059)                                           Revision: 10 Task
Standard:
 
Critical:
==Title:==
Grade #3 4.6.3 WHEN lowering DG load, MAINTAIN Examinee maintains KV ARs at approximately 50% YD N[gj so uo Kvar loading at 50% of kW value, using of EDG Load using the Voltage Regulator. "B" DG "VOLTAGE CNTL REG AUTO CNTL" (C-08). Cue: Comments:
Unload and Shutdown the "B" EDG (Alt Path)
STEP Performance:
STEP Performance:                                   Standard:                                           Critical:         Grade
Standard:
#3 4.6.3 WHEN lowering DG load, MAINTAIN Kvar loading at 50% of kW value, using Examinee maintains KVARs at approximately 50%     YD     N[gj     so uo of EDG Load using the Voltage Regulator.
Critical:
          "B" DG "VOLTAGE CNTL REG AUTO CNTL" (C-08).
Grade #4 4.6.4 ADJUST "B" DG "LOAD CNTL Examinee adjusts the Governor Control to obtain YD N[gj so uo GOVERNOR CNTL" to reduce load to 1400 KW and voltage Regulator 700 Kvars in 1,400 kW (C-08). equal adjustments maintaining Kvars half of KW. Cue: Comments:
Cue:
STEP Performance:
Comments:
Standard:
STEP Performance:                                   Standard:                                           Critical:         Grade
Critical:
#4 4.6.4 ADJUST "B" DG "LOAD CNTL                 Examinee adjusts the Governor Control to obtain     YD     N[gj     so uo GOVERNOR CNTL" to reduce load to         1400 KW and voltage Regulator to~ 700 Kvars in 1,400 kW (C-08).                       equal adjustments maintaining Kvars half of KW.
Grade #5 NOTE YD N[gj so uo DG operation at 1,400 kW for at least five Examinee reads and acknowledges the note. minutes allows for proper cooldown of components and equalization of temperatures.
Cue:
Cue: Comments:
Comments:
STEP Performance:
STEP Performance:                                   Standard:                                             Critical:       Grade
Standard:
#5                       NOTE                                                                         YD     N[gj     so uo DG operation at 1,400 kW for at least five     Examinee reads and acknowledges the note.
Critical:
minutes allows for proper cooldown of components and equalization of temperatures.
Grade #6 4.6.5 ALLOW DG to operate at 1,400 kW for at When EDG is at 1400 KW the Examinee states YD N[gj so uo least five minutes. they are waiting the 5 minutes for cooldown.
Cue:
Cue: BOOTH: Once the examinee reports they are waiting the 5 minutes, or at the discretion of the examiner, trigger Event 1. Comments:
Comments:
Actions taken for the EDG malfunction are in the subsequent JPM steps. 6 STEP #7 PERFORMANCE INFORMATION JPMNumber:
STEP Performance:                                   Standard:                                             Critical:       Grade
JPM-S6 (JPM 059) Revision:
#6 4.6.5 ALLOW DG to operate at 1,400 kW for at   When EDG is at ~ 1400 KW the Examinee states       YD     N[gj     so uo least five minutes.                     they are waiting the 5 minutes for cooldown.
Task Title: Unload and Shutdown the "B" EDG (Alt Path) Performance:
Cue:
Standard:
BOOTH: Once the examinee reports they are waiting the 5 minutes, or at the discretion of the examiner, trigger Event 1.
OP 2346C, "B" Emergency Diesel Generator Precaution 3.8, 3.8 The following steps for use in emergencies 1 * (since it causes abrupt changes in engine loading and power output to the line) have been discussed in pre-job briefing:
Comments:
1
Actions taken for the EDG malfunction are in the subsequent JPM steps.
* 3. 8 .1 If, at any time, it becomes necessary to immediately stop either DG, perform the Cue: following:
6
1
 
* a. Using "EMERGENCY STOP. PUSH TO STOP ENGINE," button, TRIP DG fuel racks (local) OR simultaneously press both "EMERG STOP" buttons for DG (C-08) (C-38 if in local control).
PERFORMANCE INFORMATION JPMNumber:             JPM-S6 (JPM 059)                                                   Revision: 10 Task
 
==Title:==
Unload and Shutdown the "B" EDG (Alt Path)
STEP Performance:                                         Standard:                                               Critical:        Grade
#7  OP 2346C, "B" Emergency Diesel Generator Precaution 3.8, 3.8 The following steps for use in emergencies (since it causes abrupt changes in engine 1*    Examinee dete1mines an abnormal condition exists and the "B" DIG and output breaker YD    N['.]      so uo loading and power output to the line) have         should have tripped.
been discussed in pre-job briefing:         1
* Examinee simultaneously (momentarily) presses both EMERG STOP buttons for the Y['.]  ND          so uo
: 3. 8 .1 If, at any time, it becomes necessary to immediately stop either DG, perform the       "B" DIG.
following:
: a. Using "EMERGENCY STOP. PUSH 1*    Examinee observes the following:
o "B" DIG and the output breaker trip YD    N['.]      so uo TO STOP ENGINE," button, TRIP             o "B" DIG Frequency is at minimum (58 Hz).
DG fuel racks (local) OR                   o "B" DIG output breaker, A401, is open simultaneously press both "EMERG             (green light is lit and red light is out).
STOP" buttons for DG (C-08) (C-38 if in local control).
: b. Ensure the following (C-38):
: b. Ensure the following (C-38):
* DG "AC. BREAKER" opens
* DG "AC. BREAKER" opens
* Field excitation indicates 0 volts
* Field excitation indicates 0 volts
* Diesel engine shuts down Examinee dete1mines an abnormal condition exists and the "B" DIG and output breaker should have tripped. Examinee simultaneously (momentarily) presses both EMERG STOP buttons for the "B" DIG. Examinee observes the following:
* Diesel engine shuts down Cue:
o "B" DIG and the output breaker trip o "B" DIG Frequency is at minimum (58 Hz). o "B" DIG output breaker, A401, is open (green light is lit and red light is out). If the Examinee recommends tripping the "B" EDG, acknowledge and concur with the recommendation.
If the Examinee recommends tripping the "B" EDG, acknowledge and concur with the recommendation.
Comments:
Comments:
10 Critical:
YD N['.] Y['.] ND YD N['.]
* The normal Start/Stop switch will not function to stop the "B" DIG (as part of the JPM to require use of the trip buttons).
* The normal Start/Stop switch will not function to stop the "B" DIG (as part of the JPM to require use of the trip buttons).
Grade so uo so uo so uo
* The examinee may use the guidance of OP 2346C, Precaution 3.8, or ARP-2590F-140 (C-081D-35) to manually trip the EDG.
* The examinee may use the guidance of OP 2346C, Precaution 3.8, or ARP-2590F-140 (C-081D-35) to manually trip the EDG.
* It is NOT critical which procedural guidance is used, only that the EDG be manually tripped from C-08.
* It is NOT critical which procedural guidance is used, only that the EDG be manually tripped from C-08.
* Once the "B" DIG is emergency tripped from C-08, the JPM is complete.
* Once the "B" DIG is emergency tripped from C-08, the JPM is complete.
7 PERFORMANCE INFORMATION JPMNumber:
7
JPM-S6 (JPM 059) Revision:
 
10 Task Title: Unload and Shutdown the "B" EDG (Alt Path) STEP Performance:
PERFORMANCE INFORMATION JPMNumber:         JPM-S6 (JPM 059)                                                     Revision:   10 Task
Standard:
 
Critical:
==Title:==
Grade #8 ARP 2590F-140 2 "DIESEL GEN 13U
Unload and Shutdown the "B" EDG (Alt Path)
* Examinee observes some or all of the YD NC2] so uo DIFFERENTILA LOCKOUT" (C-08/D-35}
STEP Performance:                                     Standard:                                                 Critical:         Grade
following:
#8 ARP 2590F-140 2 "DIESEL GEN 13U
AUTOMATIC FUNCTIONS 0 Several parameters change. 1. Generator output breaker, A401 and diesel 0 D-35; DIESEL GEN 13U trip. DIFFERENTIAL LOCKOUT 2. Generator output breaker, closing circuitry is B-36; DIESEL GEN 13U TROUBLE blocked. 0 CORRECTIVE ACTIONS
* Examinee observes some or all of the                   YD NC2]             so uo DIFFERENTILA LOCKOUT" (C-08/D-35}                     following:
* Examinee determines that the "B" DIG and YD NC2] so uo 1. IF "B" DG has not tripped, PRESS both output breaker should have tripped. so uo "EMERG STOP" buttons for "B" DG (C-08).
AUTOMATIC FUNCTIONS                                   0   Several parameters change.
* Examinee simultaneously (momentarily)
: 1. Generator output breaker, A401 and diesel           0   D-35; DIESEL GEN 13U trip.                                                 DIFFERENTIAL LOCKOUT
YC2] ND 2. VERIFY "DG B FDRBKR, 15G-13U-2 presses both EMERG STOP buttons for the (A401)" open (C-08). "B" DIG.
: 2. Generator output breaker, closing circuitry is 0    B-36; DIESEL GEN 13U TROUBLE blocked.
* Examinee observes that the "B" DIG and the YD NC2] so uo output breaker trip: o "B" DIG Frequency is at minimum (58 Hz). o "B" DIG output breaker, A401, is open (green light is lit and red light is out). Cue: If the Examinee recommends tripping the "B" EDG, acknowledge and concur with the recommendation.
CORRECTIVE ACTIONS
* Examinee determines that the "B" DIG and               YD NC2]           so uo output breaker should have tripped.
: 1. IF "B" DG has not tripped, PRESS both "EMERG STOP" buttons for "B" DG (C-08).
* Examinee     simultaneously (momentarily)             YC2] ND           so uo
: 2. VERIFY "DG B FDRBKR, 15G-13U-2                     presses both EMERG STOP buttons for the "B" DIG.
(A401)" open (C-08).
* Examinee observes that the "B" DIG and the             YD NC2]           so uo output breaker trip:
o "B" DIG Frequency is at minimum (58 Hz).
o "B" DIG output breaker, A401, is open (green light is lit and red light is out).
Cue:
If the Examinee recommends tripping the "B" EDG, acknowledge and concur with the recommendation.
Comments:
Comments:
* The normal Start/Stop switch will not function to stop the "B" DIG (as part of the JPM to require use of the trip buttons) .
* The normal Start/Stop switch will not function to stop the "B" DIG (as part of the JPM to require use of the trip buttons) .
* The examinee may use the guidance of OP 2346C, Precaution 3.8, or ARP-2590F-140 (C-08/D-35) to manually trip the EDG .
* The examinee may use the guidance of OP 2346C, Precaution 3.8, or ARP-2590F-140 (C-08/D-35) to manually trip the EDG .
* It is NOT critical which procedural guidance is used, only that the EDG be manually tripped from C-08 .
* It is NOT critical which procedural guidance is used, only that the EDG be manually tripped from C-08 .
* Once the "B" DIG is emergency tripped from C-08, the JPM is complete . TERMINATION CUE: The evaluation for this JPM is concluded.
* Once the "B" DIG is emergency tripped from C-08, the JPM is complete.
STOP TIME: ---8 VERIFICATION OF JPM COMPLETION JPMNumber:
TERMINATION CUE: The evaluation for this JPM is concluded.
JPM-S6 (JPM 059) Revision:
STOP TIME: - - -
10 Date Performed:
8
Student: For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
 
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. As necessary, refer to TIG-04 for additional Pass/Fail criteria.
VERIFICATION OF JPM COMPLETION JPMNumber:                         JPM-S6 (JPM 059)                                   Revision:         10 Date Performed:
EVALUATION SECTION: Time Critical Task? D Yes IZ! No Validated Time (minutes):
Student:
I 10 Actual Time to Complete (minutes):
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
I Work Practice Performance:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
D SAT D UNSAT Operator Fundamentals:
As necessary, refer to TIG-04 for additional Pass/Fail criteria.
D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question #1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:
EVALUATION SECTION:
Time Critical Task?                                 D   Yes   IZ! No Validated Time (minutes):               10         Actual Time to Complete (minutes):
I                                                                  I Work Practice Performance:                         D   SAT             D   UNSAT Operator Fundamentals:                             D   SAT             D   UNSAT JPM Question Portion Overall [NLO only]:           D   SAT             D   UNSAT               D   N/A Attached Question #1       D   SAT             D   UNSAT Attached Question #2       D   SAT             D   UNSAT Overall Result of JPM:                             D   SAT             D   UNSAT Evaluator:
Print I Sign Areas for Improvement I Comments:
Print I Sign Areas for Improvement I Comments:
9 JPMNumber:
9
Initial Conditions:
 
Initiating Cues: STUDENT HANDOUT JPM-S6 (JPM 059) Revision:
STUDENT HANDOUT JPMNumber:                    JPM-S6 (JPM 059)                           Revision:         10 Initial Conditions: 1. The Plant is stable at 100% power with all conditions nonnal.
10 1. The Plant is stable at 100% power with all conditions nonnal. 2. The "B" EDG has been continually running at full load, in parallel with Bus 24D for a surveillance run. 3. All data was collected on OP 2346C-002, the Unit Supervisor has completed his review and all data is SAT. The Unit Supervisor has directed you to Unload and Secure the "B" EDG in accordance with OP 2346C, "B" Emergency Diesel Generator procedure.
: 2. The "B" EDG has been continually running at full load, in parallel with Bus 24D for a surveillance run.
10 JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: Respond to SG Level Safety Channel Failure Low JPMNumber:
: 3. All data was collected on OP 2346C-002, the Unit Supervisor has completed his review and all data is SAT.
JPM-S7 Revision:
Initiating Cues:    The Unit Supervisor has directed you to Unload and Secure the "B" EDG in accordance with OP 2346C, "B" Emergency Diesel Generator procedure.
010 Initiated:
10
Robert L. Cimmino, Jr. (Signature on File) 01/30/2017 Developer Date Reviewed:
 
Will Chesnutt (Signature on File) 01/31/2017 Technical Reviewer Date Approved:
JOB PERFORMANCE MEASURE APPROVAL SHEET JPM
Michael J. Cote (Signature on File) 02/01/2017 Supervisor, Nuclear Training Date 1
 
==Title:==
Respond to SG Level Safety Channel Failure Low JPMNumber:     JPM-S7                                         Revision:       010 Initiated:
Robert L. Cimmino, Jr. (Signature on File)                 01/30/2017 Developer                                       Date Reviewed:
Will Chesnutt (Signature on File)                       01/31/2017 Technical Reviewer                                 Date Approved:
Michael J. Cote (Signature on File)                     02/01/2017 Supervisor, Nuclear Training                             Date 1


==SUMMARY==
==SUMMARY==
OF CHANGES DATE DESCRIPTION REV/CHANGE 01/12/17 RLC Created new JPM for 2017 NRC Re-Take 010 2 JPM WORKSHEET Facility:
OF CHANGES DATE                         DESCRIPTION     REV/CHANGE 01/12/17 RLC Created new JPM for 2017 NRC Re-Take     010 2
MPUnit2 Examinee:
JPMNumber:
JPM-S7 Revision:
0/0 ---Task Title: Respond to SG Level Safety Channel Failure Low System: RPS andAFAS Time Critical Task: D YES 12:1 NO Validated Time (minutes):
10 Task Number(s):
NUTIMS # 012-01-006 Applicable To: STA RO X PEO ---SRO ---KIA Number: ---------KIA Rating: -------012/A4.03 3.613.6 Method of Testing: Simulated Performance:
Actual Performance:
x Location:
Classroom:
Simulator:
x In-Plant:
Task Standards:
At the completion of this JPM, the examinee has responded to the failure of Safety Channel "B" Steam Generator Level, to include bypassing the appropriate RPS and AF AS channels.
Required Materials: (procedures, equipment, etc.) General


==References:==
JPM WORKSHEET Facility:      MPUnit2                      Examinee:
* ARP 2590C-006, CB-1, Rev. 000-00, "SG LO LEVEL TRIP CH B"
JPMNumber:                                                            Revision:
JPM-S7
                                                                                    - 0/0 Task
 
==Title:==
Respond to SG Level Safety Channel Failure Low System:            RPS andAFAS Time Critical Task:                  D  YES    12:1 NO Validated Time (minutes):                10 Task Number(s):                  NUTIMS # 012-01-006 Applicable To:                SRO                  STA                      RO    X            PEO KIA Number:                                      KIA Rating:            3.613.6
                  - - -012/A4.03 Method of Testing:          Simulated Performance:                                  Actual Performance:          x Location:                  Classroom:                          Simulator:        x                In-Plant:
Task Standards:                At the completion of this JPM, the examinee has responded to the failure of Safety Channel "B" Steam Generator Level, to include bypassing the appropriate RPS and AFAS channels.
Required Materials:
* ARP 2590C-006, CB-1, Rev. 000-00, "SG LO LEVEL TRIP CH B" (procedures, equipment, etc.)
* Unit 2 Technical Specifications
* Unit 2 Technical Specifications
* RPS bypass key for SG Level
* RPS bypass key for SG Level
* C-51 7 and C-518 bypass keys ARP 2590C-006, CB-1, Rev. 000-00, "SG LO LEVEL TRIP CH B" *** READ TO THE EXAMINEE *** I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied.
* C-51 7 and C-518 bypass keys General
With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
 
3 JPM WORKSHEET JPMNumber:
==References:==
JPM-S7 Revision:
ARP 2590C-006, CB-1, Rev. 000-00, "SG LO LEVEL TRIP CH B"
0/0 Initial Conditions:
                                        *** READ TO THE EXAMINEE ***
Initiating Cues: Simulator Requirements:
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
The plant is stable at 100% power with all operating conditions normal.
3
 
JPM WORKSHEET JPMNumber:                     JPM-S7                         Revision:       0/0 Initial Conditions:           The plant is stable at 100% power with all operating conditions normal.
Initiating Cues:
* You are the BOP .
* You are the BOP .
* Respond to changing parameters and alarms by reporting your observations and conclusions.
* Respond to changing parameters and alarms by reporting your observations and conclusions.
* The examiner will act as the Unit Supervisor, participate in the communication process.
* The examiner will act as the Unit Supervisor, participate in the communication process.
* Make recommendations and perf onn actions as required.
* Make recommendations and perfonn actions as required.
Simulator Requirements:
* Initialize to any at power IC with all operating conditions normal.
* Initialize to any at power IC with all operating conditions normal.
* Ensure all bypass keys are removed from Channel "B" of RPS and C-517 and C-518.
* Ensure all bypass keys are removed from Channel "B" of RPS and C-517 and C-518.
* When examinee is in position (or directed by the floor evaluator), enter malfunction RP13B at 0% severity, no ramp, to fail LT-l l 13B (#1 SG Safety Ch "B" level) input to all systems at 0%. ****NOTES TO TASK PERFORMANCE EVALUATOR****
* When examinee is in position (or directed by the floor evaluator), enter malfunction RP13B at 0% severity, no ramp, to fail LT-l l 13B (#1 SG Safety Ch "B" level) input to all systems at 0%.
                ****NOTES TO TASK PERFORMANCE EVALUATOR****
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). 4 PERFORMANCE INFORMATION JPMNumber:
: 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
JPM-S7 Revision:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
0/0 Task Title: Respond to SG Level Safety Channel Failure Low START TIME: ----STEP Performance:
4
Standard:
 
Critical:
PERFORMANCE INFORMATION JPMNumber:         JPM-S7                                                               Revision:       0/0 Task
Grade #1 C-04, CB-1; ARP 2590C-006, "SG LO Examinee acknowledges the C-04 alarm, checks so uo LEVEL TRIP CH B" Actions: primary plant parameters, notes reactor did not trip AUTOMATIC FUNCTIONS and reports observations to the US. 1. If 2 RPS channels actuate, reactor trips. Examinee should recommend and/or reference ARP 2590C-006 and note that two channels of RPS did not actuate and the reactor did not trip. Cue: Booth: when directed, activate malfunction RP13B at 0%, no ramp. When the alarm actuates, solicit status of the reactor if not automatically given. Acknowledge any communication as the US and solicit recommendations for actions to take for the alarm ifthe examinee does not suggest referencing the applicable ARP. Comments:
 
STEP Performance:
==Title:==
Standard:
Respond to SG Level Safety Channel Failure Low START TIME: - - - -
Critical:
STEP Performance:                                         Standard:                                               Critical:     Grade
Grade #2 CORRECTIVE ACTIONS Examinee notes reactor did not trip and the step is so uo 1. IF reactor trips, Go To BOP 2525, NIA (i.e.; does not transition to EOP 2525). "Standard Post Trip Actions" and PERFORM necessary corrective actions. Cue: Comments:
#1 C-04, CB-1; ARP 2590C-006, "SG LO                     Examinee acknowledges the C-04 alarm, checks           YON~          so uo LEVEL TRIP CH B" Actions:                             primary plant parameters, notes reactor did not trip AUTOMATIC FUNCTIONS                                   and reports observations to the US.
STEP Performance:
Examinee should recommend and/or reference
Standard:
: 1. If 2 RPS channels actuate, reactor trips.
Critical:
ARP 2590C-006 and note that two channels of RPS did not actuate and the reactor did not trip.
Grade #3 2. OBSERVE channel "B" SG level indication Examinee notes # 1 SG Safety Channel "B" level so uo and COMP ARE to other safety channel indication has failed low, when compared to the indications (C-05, PPC). other three safety channels.
Cue: Booth: when directed, activate malfunction RP13B at 0%, no ramp.
Cue: Comments:
When the alarm actuates, solicit status of the reactor if not automatically given. Acknowledge any communication as the US and solicit recommendations for actions to take for the alarm ifthe examinee does not suggest referencing the applicable ARP.
Examinee may also note the #1 SG level control channel has not changed from pre-event conditions.
Comments:
5 PERFORMANCE INFORMATION JPMNumber:
STEP Performance:                                         Standard:                                               Critical:     Grade
JPM-S7 Revision:
#2 CORRECTIVE ACTIONS                                   Examinee notes reactor did not trip and the step is   YON~          so uo
0/0 Task Title: Respond to SG Level Safety Channel Failure Low STEP Performance:
: 1. IF reactor trips, Go To BOP 2525,                 NIA (i.e.; does not transition to EOP 2525).
Standard:
          "Standard Post Trip Actions" and PERFORM necessary corrective actions.
Critical:
Cue:
Grade #4 3. IF SG level is less than 49.5% AND no Examinee notes SG actual level has not lowered YD N[8] so uo automatic reactor trip has occurred, below pre-event values (i.e.; does not transition to manually TRIP reactor and Go To EOP EOP 2525). 2525, "Standard Post Trip Actions." Cue: Comments:
Comments:
STEP Perfonnance:
STEP Performance:                                         Standard:                                               Critical:     Grade
Standard:
#3 2. OBSERVE channel "B" SG level indication           Examinee notes # 1 SG Safety Channel "B" level         YON~        so uo and COMPARE to other safety channel             indication has failed low, when compared to the indications (C-05, PPC).                         other three safety channels.
Critical:
Cue:
Grade #5 4. IF SG level is greater than 49.5% AND Examinee notes SG level is greater than 49.5% and YD N[8] so uo alann is due to instrument malfunction, notes alann appears to be due to instrument PERFORM the following:
Comments: Examinee may also note the #1 SG level control channel has not changed from pre-event conditions.
malfunction.
5
4.1. OBTAIN necessary keys and Examinee obtains RPS SG Level bistable bypass Y[8] ND so uo PERFORM applicable actions to key (#4) from applicable RPS channel, inserts it bypass channel "B" SG level into RPS Channel "B" SG Level bistable and bistables on RPS, C-517, and C-518. turns it clockwise to bypass the tripped bistable.
 
4.2. Refer To the following Technical Examinee gets 2 AF AS bypass keys from Specifications LCOs and simulator key locker, inserts a key into HS-DETERMINE applicability:
PERFORMANCE INFORMATION JPMNumber:         JPM-S7                                                             Revision:     0/0 Task
1113B-1 (C-517) and HS-1113B-2 (C-518) and
 
* 3.3.1.1, Table 3.3-1 turns both keys clockwise to bypass the failed
==Title:==
* 3.3.2.1, Table 3.3-3 Channel "B" SG Level inputs to both facilities
Respond to SG Level Safety Channel Failure Low STEP Performance:                                       Standard:                                               Critical: Grade
* 3.3.3.5, Table 3.3-9 (LI-1123B only) ofAFAS . Examinee then suggests the US refer to the listed YD N[8] so uo Tech. Spec. LCOs to detennine applicability.
#4 3. IF SG level is less than 49.5% AND no           Examinee notes SG actual level has not lowered         YD N[8]   so uo automatic reactor trip has occurred,         below pre-event values (i.e.; does not transition to manually TRIP reactor and Go To EOP           EOP 2525).
2525, "Standard Post Trip Actions."
Cue:
Comments:
STEP Perfonnance:                                       Standard:                                               Critical: Grade
#5 4. IF SG level is greater than 49.5% AND           Examinee notes SG level is greater than 49.5% and     YD N[8]   so uo alann is due to instrument malfunction,       notes alann appears to be due to instrument PERFORM the following:                       malfunction.
4.1. OBTAIN necessary keys and PERFORM applicable actions to Examinee obtains RPS SG Level bistable bypass         Y[8] ND   so uo key (#4) from applicable RPS channel, inserts it bypass channel "B" SG level             into RPS Channel "B" SG Level bistable and bistables on RPS, C-517, and C-518. turns it clockwise to bypass the tripped bistable.
4.2. Refer To the following Technical         Examinee gets 2 AFAS bypass keys from Specifications LCOs and                 simulator key locker, inserts a key into HS-DETERMINE applicability:               1113B-1 (C-517) and HS-1113B-2 (C-518) and
* 3.3.1.1, Table 3.3-1                   turns both keys clockwise to bypass the failed
* 3.3.2.1, Table 3.3-3                   Channel "B" SG Level inputs to both facilities
* 3.3.3.5, Table 3.3-9 (LI-1123B only)   ofAFAS .
Examinee then suggests the US refer to the listed     YD N[8]   so uo Tech. Spec. LCOs to detennine applicability.
Cue: As necessary:
Cue: As necessary:
Solicit examinee for suggested actions and concur. Note that the RO will continue as Operator At The Controls (while BOP goes behind the control boards). Comments:
Solicit examinee for suggested actions and concur.
Step "4.1" is the only critical part of JPM Step #5. TERMINATION CUE: The evaluation for this JPM is concluded.
Note that the RO will continue as Operator At The Controls (while BOP goes behind the control boards).
STOP TIME: 6 VERIFICATION OF JPM COMPLETION JPMNumber:
Comments: Step "4.1" is the only critical part of JPM Step #5.
JPM-S7 Revision:
TERMINATION CUE: The evaluation for this JPM is concluded.
0/0 Date Performed:
STOP TIME:
Student: For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
6
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. EVALUATION SECTION: Time Critical Task? D Yes C8'.I No Validated Time (minutes):
 
I 10 Actual Time to Complete (minutes):
VERIFICATION OF JPM COMPLETION JPMNumber:                               JPM-S7                                       Revision:         0/0 Date Performed:
I Work Practice Performance:
Student:
D SAT D UNSAT Operator Fundamentals:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question # 1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
EVALUATION SECTION:
Time Critical Task?                                 D   Yes C8'.I No Validated Time (minutes):               10         Actual Time to Complete (minutes):
I                                                                  I Work Practice Performance:                         D   SAT             D   UNSAT Operator Fundamentals:                             D   SAT             D   UNSAT JPM Question Portion Overall [NLO only]:           D   SAT             D   UNSAT               D   N/A Attached Question # 1       D   SAT             D   UNSAT Attached Question #2       D   SAT             D   UNSAT Overall Result of JPM:                             D   SAT             D UNSAT Evaluator:
Print I Sign Areas for Improvement I Comments:
Print I Sign Areas for Improvement I Comments:
STUDENT HANDOUT 7 JPMNumber:
STUDENT HANDOUT 7
Initial Conditions:
 
Initiating Cues: JPM-S7 Revision:
JPMNumber:                   JPM-S7                                 Revision:           0/0 Initial Conditions: The plant is stable at 100% power with all operating conditions normal.
0/0 The plant is stable at 100% power with all operating conditions normal.
Initiating Cues:
* You are the BOP .
* You are the BOP .
* Respond to changing parameters and alarms by reporting your observations and conclusions.
* Respond to changing parameters and alarms by reporting your observations and conclusions.
* The examiner will act as the Unit Supervisor, participate in the communication process.
* The examiner will act as the Unit Supervisor, participate in the communication process.
* Make recommendations and perform actions as required.
* Make recommendations and perform actions as required.
8 JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: Respond to the Loss of a 2nd Circulating Water Pump JPMNumber:
8
JPM-S8 Revision:
 
010 Initiated:
JOB PERFORMANCE MEASURE APPROVAL SHEET JPM
Robert L. Cimmino, Jr. (Signature on File) 01/30/2017 Developer Date Reviewed:
 
Will Chesnutt (Signature on File) 01/31/2017 Technical Reviewer Date Approved:
==Title:==
Michael J. Cote (Signature on File) 02/01/2017 Supervisor, Nuclear Training Date 1
Respond to the Loss of a 2nd Circulating Water Pump JPMNumber:     JPM-S8                                           Revision:       010 Initiated:
Robert L. Cimmino, Jr. (Signature on File)                     01/30/2017 Developer                                         Date Reviewed:
Will Chesnutt (Signature on File)                           01/31/2017 Technical Reviewer                                     Date Approved:
Michael J. Cote (Signature on File)                         02/01/2017 Supervisor, Nuclear Training                               Date 1


==SUMMARY==
==SUMMARY==
OF CHANGES DATE DESCRIPTION REV/CHANGE 01/18/17 rlc Created new JPM for 2017 NRC Re-Take Exam 010 2 JPM WORKSHEET Facility:
OF CHANGES DATE                         DESCRIPTION         REV/CHANGE 01/18/17 rlc Created new JPM for 2017 NRC Re-Take Exam     010 2
MPUnit2 Examinee:
 
JPMNumber:
JPM WORKSHEET Facility:     MPUnit2                       Examinee:
JPM-S8 Revision:
JPMNumber:                         JPM-S8                               Revision:     0/0 Task
0/0 Task Title: Respond to the Loss of a 2&deg;d Circulating Water Pump System: Circulating Water Time Critical Task: D YES l3:I NO Validated Time (minutes):  
 
------10 Task Number(s):
==Title:==
Applicable To: KIA Number: Method of Testing: Location:
Respond to the Loss of a 2&deg;d Circulating Water Pump System:             Circulating Water Time Critical Task:                   D   YES     l3:I NO Validated Time (minutes): - - - -
Task Standards:
Task Number(s):                         000-04-250 Applicable To:                SRO       x         STA                     RO     x           PEO KIA Number:                                      KIA Rating:
000-04-250 SRO x STA RO x PEO 075/A2.02 KIA Rating: 2.5/2.7 --------Simulated Performance:
075/A2.02
Actual Performance:
                                                                - - -2.5/2.7 Method of Testing:          Simulated Performance:                                   Actual Performance:           x Location:                  Classroom:                           Simulator:       x                 In-Plant:
x Classroom:
Task Standards:                At the completion of this JPM, the examinee has cross-tied the "A" and "B" Circ.
Simulator:
Water pumps in response to an existing trip of the "A" Circ. Water pump, noted the subsequent loss of the "B" Circ. Water pump and either recommends or initiates a manual plant trip prior to an automatic plant trip on high condenser backpressure.
x In-Plant:
Required Materials:             AOP 2517, Circulating Water Malfunctions (procedures, equipment, etc.)   ARP 2590E-050 (C06/7, B-9); CIRC WATER PUMP B OVERLOAD/TRIP General  
At the completion of this JPM, the examinee has cross-tied the "A" and "B" Circ. Water pumps in response to an existing trip of the "A" Circ. Water pump, noted the subsequent loss of the "B" Circ. Water pump and either recommends or initiates a manual plant trip prior to an automatic plant trip on high condenser backpressure.
Required Materials: (procedures, equipment, etc.) AOP 2517, Circulating Water Malfunctions ARP 2590E-050 (C06/7, B-9); CIRC WATER PUMP B OVERLOAD/TRIP General  


==References:==
==References:==
AOP 2517, Circulating Water Malfunctions ARP 2590E-050 (C06/7, B-9); CIRC WATER PUMP B OVERLOAD/TRIP
                                        *** READ TO THE EXAMINEE ***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as ifthe evolution was actually being performed.
3


AOP 2517, Circulating Water Malfunctions ARP 2590E-050 (C06/7, B-9); CIRC WATER PUMP B OVERLOAD/TRIP
JPM WORKSHEET JPMNumber:                     JPM-S8                       Revision:       0/0 Initial Conditions:           The "A" Circulating Water pump has just tripped on overload and the crew has entered AOP 2517, Circulating Water Malfunctions.
*** READ TO THE EXAMINEE *** I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied.
With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as ifthe evolution was actually being performed.
3 JPM WORKSHEET JPMNumber:
JPM-S8 Revision:
0/0 Initial Conditions:
Initiating Cues: Simulator Requirements:
The "A" Circulating Water pump has just tripped on overload and the crew has entered AOP 2517, Circulating Water Malfunctions.
The plant is at 100% power, steady state, with all other systems and components are operating normally for the given conditions.
The plant is at 100% power, steady state, with all other systems and components are operating normally for the given conditions.
No liquid waste discharges are on progress.
No liquid waste discharges are on progress.
No sodium hypochlorite shocking of bays is in progress.
No sodium hypochlorite shocking of bays is in progress.
You are the Balance Of Plant (BOP) operator and have been instructed by the US to commence the actions of AOP 2517, Circulating Water Malfunctions, starting with step 3.0, Initial Actions. 1. Initialize to 100% power, steady state, all equipment operating normally.
Initiating Cues:              You are the Balance Of Plant (BOP) operator and have been instructed by the US to commence the actions of AOP 2517, Circulating Water Malfunctions, starting with step 3.0, Initial Actions.
: 2. Ensure all VFDs are set to 100% 3. Trip the "A" CW pump (CWOlA), acknowledge all alarms and place simulator in FREEZE until the examinee takes the watch. 4. Call up the malfunction to trip the "B" CW pump (CWOlB) and have it ready to trigger. ****NOTES TO TASK PERFORMANCE EVALUATOR****
Simulator Requirements:        1. Initialize to 100% power, steady state, all equipment operating normally.
: 2. Ensure all VFDs are set to 100%
: 3. Trip the "A" CW pump (CWOlA), acknowledge all alarms and place simulator in FREEZE until the examinee takes the watch.
: 4. Call up the malfunction to trip the "B" CW pump (CWOlB) and have it ready to trigger.
                  ****NOTES TO TASK PERFORMANCE EVALUATOR****
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). 4 PERFORMANCE INFORMATION JPMNumber:
: 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
JPM-S8 Revision:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
0/0 Task Title: Respond to the Loss of a 2"d Circulating Wafor _PumQ START TIME: ----STEP Performance:
4
Standard:
 
Critical:
PERFORMANCE INFORMATION JPMNumber:         JPM-S8                                                             Revision:         0/0 Task
Grade #1 AOP 2517 2 Circ. Water Malfunctions so uo 3.0 Initial Actions INSTRUCTIONS 3 .1 CHECK the following condition exists:
 
* BOTH circulating water pumps are tripped in ONE condenser Examinee notes that only one Circ. Water pump CONTINGENCY ACTIONS has tripped and per the Contingency Action 3 .1.1, 3.1.1 Proceed To step 3.3. proceeds to step 3 .3 Cue: BOOTH: When the examinee is ready to take the watch, place the simulator in RUN. Comments:
==Title:==
STEP Performance:
Respond to the Loss of a 2"d Circulating Wafor _PumQ START TIME: - - - -
Standard:
STEP Performance:                                         Standard:                                                 Critical:         Grade
Critical:
#1 AOP 2517 2 Circ. Water Malfunctions                                                                         YON~              so uo 3.0 Initial Actions INSTRUCTIONS 3 .1 CHECK the following condition exists:
Grade #2 *3 .3 MONITOR condenser backpressure The examinee should continuously monitor (*)
* BOTH circulating water pumps are tripped in ONE condenser                   Examinee notes that only one Circ. Water pump CONTINGENCY ACTIONS                                 has tripped and per the Contingency Action 3 .1.1, 3.1.1 Proceed To step 3.3.                     proceeds to step 3 .3 Cue:
so uo maintained less than or equal to 4.5 in Hg. condenser backpressure to ensure</=
BOOTH: When the examinee is ready to take the watch, place the simulator in RUN.
4.5" Hg. Ifbackpressure is>/= 6.5" Hg, the Examinee notes the Contingency Action guidance and recommends and/or trips the plant. Cue: If examinee suggests the plant be (conservatively) tripped due to rising condenser back pressure, decline the request and state that backpressure appears to be rising at a slower rate and to continue with the AOP actions at this time. Comments:
Comments:
Once a 2nd CW pump is lost, the examinee may recommend tripping the plant at any time due to rising backpressure.
STEP Performance:                                         Standard:                                                 Critical:         Grade
If this recommendation is made, the JPM may be considered complete.
#2 *3 .3 MONITOR condenser backpressure                 The examinee should continuously monitor (*)           YON~              so uo maintained less than or equal to 4.5 in Hg. condenser backpressure to ensure</= 4.5" Hg.
5 PERFORMANCE INFORMATION JPMNumber:
Ifbackpressure is>/= 6.5" Hg, the Examinee notes the Contingency Action guidance and recommends and/or trips the plant.
JPM-S8 Revision:
Cue:
0/0 Task Title: Respond to the Loss of a -1:d Water Pump STEP Performance:
If examinee suggests the plant be (conservatively) tripped due to rising condenser back pressure, decline the request and state that backpressure appears to be rising at a slower rate and to continue with the AOP actions at this time.
Standard:
Comments:
Critical:
Once a 2nd CW pump is lost, the examinee may recommend tripping the plant at any time due to rising backpressure. If this recommendation is made, the JPM may be considered complete.
Grade #3 3.4 RAISE speed of all VFD mode operating Examinee notes all VFDs at I 00% value.
5
so uo circulating water pumps to I 00%. Cue: Comments:
 
STEP Performance:
PERFORMANCE INFORMATION JPMNumber:           JPM-S8                                                       Revision:   0/0 Task
Standard:
 
Critical:
==Title:==
Grade #4 3.5 CLOSE water box inlets for pumps which Examinee notes the "A" CW pump has tripped and so uo tripped: closes CW-1 IH, "A" water box inlet on C-06 (red a. CW-1 lH, "A" water box inlet light out, green light lit). b. CW-11 G, "B" water box inlet c. CW-llF, "C" water box inlet d. CW-1 lE, "D" water box inlet Cue: Comments:
Respond to the Loss of a-1:d Cir~ulating Water Pump STEP Performance:                                     Standard:                                         Critical: Grade
STEP Performance:
#3 3.4 RAISE speed of all VFD mode operating         Examinee notes all VFDs at I 00% value.         YON~      so uo circulating water pumps to I 00%.
Standard:
Cue:
Critical:
Comments:
Grade #5 NOTE so uo A 15 to 20 second pause is required after Examinee reads and acknowledges the note. receiving the full closed position indication to allow for full closure prior to opening the crosstie valve. Cue: Comments:
STEP Performance:                                     Standard:                                         Critical: Grade
6 PERFORMANCE INFORMATION JPM Number: _JP:...::....::M.:.::__:-S:..:8:____
#4 3.5 CLOSE water box inlets for pumps which       Examinee notes the "A" CW pump has tripped and   Y~NO      so uo tripped:                                     closes CW-1 IH, "A" water box inlet on C-06 (red
______________
: a. CW-1 lH, "A" water box inlet             light out, green light lit).
_ Revision:
: b. CW-11 G, "B" water box inlet
0/0 Task Title: Respond to the Loss of a 2"d Circulating Water Pump STEP Performance:
: c. CW-llF, "C" water box inlet
Standard:
: d. CW-1 lE, "D" water box inlet Cue:
Critical:
Comments:
Grade #6 3.6 CHECK water box inlets for tripped pumps Examinee notes CW-I IH is closed, waits I5 -20 Ytzl ND so uo closed. seconds, then opens CW-12D, condenser IA inlet a. OPEN the following waterbox cross-tie cross-tie (red light lit, green light out on C-06). valves for tripped pump(s):
STEP Performance:                                     Standard:                                         Critical: Grade
#5                       NOTE                                                                         YON~      so uo A 15 to 20 second pause is required after Examinee reads and acknowledges the note.
receiving the full closed position indication to allow for full closure prior to opening the crosstie valve.
Cue:
Comments:
6
 
PERFORMANCE INFORMATION JPM Number:       _JP:.. ::.. .::M.:.::__:-S:..:8:_____ _ _ _ _ _ _ _ _ _ _ _ _ __                        Revision: 0/0 Task
 
==Title:==
Respond to the Loss of a 2"d Circulating Water Pump STEP Performance:                                                         Standard:                                             Critical: Grade
#6 3.6 CHECK water box inlets for tripped pumps closed.
Examinee notes CW-I IH is closed, waits I5 - 20       Ytzl ND   so uo seconds, then opens CW-12D, condenser IA inlet
: a. OPEN the following waterbox cross-tie                       cross-tie (red light lit, green light out on C-06).
valves for tripped pump(s):
* CW-I2D, condenser IA inlet cross-tie
* CW-I2D, condenser IA inlet cross-tie
* CW-I 2C, condenser 1B inlet cross-tie Cue: BOOTH: When examinee completes step 3.6 (before beginning step 3.7) immediately trip the "B" CW Pump (trigger CWOlB). Comments:
* CW- I 2C, condenser 1B inlet cross-tie Cue:
The critical only action is to open CW-12D. When the 2&deg;ct CW pump is lost, the examinee may immediately recommend tripping the plant. STEP Performance:
BOOTH: When examinee completes step 3.6 (before beginning step 3.7) immediately trip the "B" CW Pump (trigger CWOlB).
Standard:
Comments: The critical only action is to open CW-12D. When the 2&deg;ct CW pump is lost, the examinee may immediately recommend tripping the plant.
Critical:
STEP Performance:                                                         Standard:                                             Critical: Grade
Grade #7 ARP 2590E-050 (C06/7, B-9); CIRC WATER Examinee notes and acknowledges the "B" CW YD N[8J so uo PUMP B OVERLOAD/TRIP pump trip. AUTOMATIC FUNCTIONS Examinee informs US of the "B" CW pump trip. 1. "B" circulating water pump trips and alarms. Examinee may elect to recommend and/or trip Y[8J ND so uo CORRECTIVE ACTIONS the plant at this time, or proceed with the ARP 1. NOTIFY Security Shift Operations guidance to demonstrate the procedure flow path. Supervisor that the "B" circulating water 1. Informs US to notify Security Shift Operations pump has tripped. Supervisor that the "B" circulating water pump 2. Go To AOP 25I7, "Circulating Water has tripped. Malfunctions." 2. Goes back to AOP 2517, CW Malfunctions.
#7 ARP 2590E-050 (C06/7, B-9); CIRC WATER                               Examinee notes and acknowledges the "B" CW           YD N[8J   so uo PUMP B OVERLOAD/TRIP                                                 pump trip.
Cue: If at any time a plant trip is recommended, concur and direct. Comments:
AUTOMATIC FUNCTIONS                                                 Examinee informs US of the "B" CW pump trip.
If required, inform examinee that the Security Shift Operations Supervisor has been notified of the "B" CW pump trip. This step is critical only if a plant trip is recognized to be needed at this time. Examinee may first elect to refer to this ARP, and then go back to AOP 25 I 7 to demonstrate a procedure path. If the tripped at this time, the remaining steps are not critical.
: 1. "B" circulating water pump trips and alarms.
However, an automatic plant trip due to high condenser backpressure occurring before the examinee recommends a manual trip constitutes a failure of the JPM. Manually tripping the plant, or recommending the plant be manually tripped, due to the loss of a 2&deg;d CW pump or rising condenser backpressure, successfully completes the JPM. 7 PERFORMANCE INFORMATION JPMNumber:
CORRECTIVE ACTIONS Examinee may elect to recommend and/or trip the plant at this time, or proceed with the ARP Y[8J ND    so uo guidance to demonstrate the procedure flow path.
JPM-S8 Revision:
: 1. NOTIFY Security Shift Operations Supervisor that the "B" circulating water                       1. Informs US to notify Security Shift Operations pump has tripped.                                                   Supervisor that the "B" circulating water pump
0/0 Task Title: Respond to the Loss of a 2&deg;d Circulating Water Pump STEP Performance:
: 2. Go To AOP 25I7, "Circulating Water                                   has tripped.
Standard:
Malfunctions."                                                 2. Goes back to AOP 2517, CW Malfunctions.
Critical:
Cue: If at any time a plant trip is recommended, concur and direct.
Grade #8 AOP 2517 2 Circ. Water Malfunctions so uo 3.0 Initial Actions INSTRUCTIONS Examinee notes both circulating water pumps are 3 .1 CHECK the following condition exists: tripped in one condenser and proceeds to step 3 .2
Comments: If required, inform examinee that the Security Shift Operations Supervisor has been notified of the "B" CW pump trip.
* BOTH circulating water pumps are tripped in ONE condenser Cue: If at any time a plant trip is recommended, concur and direct. Comments:
This step is critical only if a plant trip is recognized to be needed at this time. Examinee may first elect to refer to this ARP, and then go back to AOP 25 I 7 to demonstrate a procedure path. If the plant~ tripped at this time, the remaining steps are not critical.
However, an automatic plant trip due to high condenser backpressure occurring before the examinee recommends a manual trip constitutes a failure of the JPM.
Manually tripping the plant, or recommending the plant be manually tripped, due to the loss of a 2&deg;d CW pump or rising condenser backpressure, successfully completes the JPM.
7
 
PERFORMANCE INFORMATION JPMNumber:           JPM-S8                                                           Revision:   0/0 Task
 
==Title:==
Respond to the Loss of a 2&deg;d Circulating Water Pump STEP Performance:                                         Standard:                                           Critical:         Grade
#8 AOP 2517 2 Circ. Water Malfunctions                                                                     YON~            so uo 3.0 Initial Actions INSTRUCTIONS Examinee notes both circulating water pumps are 3 .1 CHECK the following condition exists:           tripped in one condenser and proceeds to step 3 .2
* BOTH circulating water pumps are tripped in ONE condenser Cue:
If at any time a plant trip is recommended, concur and direct.
Comments:
An automatic plant trip due to high condenser backpressure occurring before the examinee recommends a manual trip constitutes a failure oftheJPM.
An automatic plant trip due to high condenser backpressure occurring before the examinee recommends a manual trip constitutes a failure oftheJPM.
Manually tripping the plant (or recommending the plant be tripped) due to the loss of a 2"d CW pump, or rising condenser backpressure, successfully completes the JPM. STEP Perfonnance:
Manually tripping the plant (or recommending the plant be tripped) due to the loss of a 2"d CW pump, or rising condenser backpressure, successfully completes the JPM.
Standard:
STEP Perfonnance:                                         Standard:                                           Critical:         Grade
Critical:
#9                       NOTE                           Examinee reads and acknowledges the note.         YON~            so uo When power is less than 15% AND linear power bistable light clears (not lit), on at least 3 RPS channels, the turbine trip is inhibited and turbine trip will not result in an automatic reactor trip.
Grade #9 NOTE Examinee reads and acknowledges the note.
Cue:
so uo When power is less than 15% AND linear power bistable light clears (not lit), on at least 3 RPS channels, the turbine trip is inhibited and turbine trip will not result in an automatic reactor trip. Cue: Comments:
Comments:
8 PERFORMANCE INFORMATION JPM Number: JPM-S8 Revision:
8
0/0 Task Title: Respond to the Loss of a znd Circulating Water Pump STEP Performance:
 
Standard:
PERFORMANCE INFORMATION JPM Number:       JPM-S8                                                           Revision:     0/0 Task
Critical:
 
Grade #10 3.2 CHECK BOTH of the following conditions Examinee notes power is> 15% and references the so uo exist: Contingency Action 3 .2.1.
==Title:==
Respond to the Loss of a znd Circulating Water Pump STEP Performance:                                       Standard:                                           Critical:           Grade
#10 3.2 CHECK BOTH of the following conditions         Examinee notes power is> 15% and references the     YON~              so uo exist:                                         Contingency Action 3 .2.1.
* Power less than 15%
* Power less than 15%
* Turbine trip inhibited Cue: Comments:
* Turbine trip inhibited Cue:
STEP Performance:
Comments:
Standard:
STEP Performance:                                       Standard:                                           Critical:           Grade
Critical:
#11 CONTINGENCY ACTIONS                                                                                   Y~NO              so uo 3.2.1 IF greater than or equal to 15% power,       Examinee recommends and/or trips the plant.
Grade #11 CONTINGENCY ACTIONS so uo 3.2.1 IF greater than or equal to 15% power, Examinee recommends and/or trips the plant. THEN PERFORM the following actions: a. TRIP the reactor and turbine. b. Go To EOP 2525, "Standard Post Trip Actions. Cue: Hat any time a plant trip is recommended, concur and direct. Comments:
THEN PERFORM the following actions:
An automatic plant trip due to high condenser backpressure occurring before the examinee recommends a manual trip constitutes a failure of the JPM. Manually tripping the plant (or recommending the plant be tripped) due to the loss of a 2&deg;d CW pump, or rising condenser backpressure, successfully completes the JPM. TERMINATION CUE: The evaluation for this JPM is concluded.
: a. TRIP the reactor and turbine.
STOP TIME: ---9 VERIFICATION OF JPM COMPLETION JPMNumber:
: b. Go To EOP 2525, "Standard Post Trip Actions.
JPM-S8 Revision:
Cue:
0/0 Date Performed:
Hat any time a plant trip is recommended, concur and direct.
Student: For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
Comments:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. EVALUATION SECTION: Time Critical Task? 0 Yes Validated Time (minutes):
An automatic plant trip due to high condenser backpressure occurring before the examinee recommends a manual trip constitutes a failure of the JPM.
I 10 Actual Time to Complete (minutes):
Manually tripping the plant (or recommending the plant be tripped) due to the loss of a 2&deg;d CW pump, or rising condenser backpressure, successfully completes the JPM.
I Work Practice Performance:
TERMINATION CUE: The evaluation for this JPM is concluded.
D SAT D UNSAT Operator Fundamentals:
STOP TIME: - - -
D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question # 1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:
9
 
VERIFICATION OF JPM COMPLETION JPMNumber:                               JPM-S8                                       Revision:         0/0 Date Performed:
Student:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
EVALUATION SECTION:
Time Critical Task?                                 0   Yes ~No Validated Time (minutes):               10         Actual Time to Complete (minutes):
I                                                                  I Work Practice Performance:                         D   SAT             D   UNSAT Operator Fundamentals:                             D   SAT             D   UNSAT JPM Question Portion Overall [NLO only]:           D   SAT             D   UNSAT               D   N/A Attached Question # 1       D   SAT             D   UNSAT Attached Question #2       D   SAT             D UNSAT Overall Result of JPM:                             D   SAT             D UNSAT Evaluator:
Print I Sign Areas for Improvement I Comments:
Print I Sign Areas for Improvement I Comments:
10 JPMNumber:
10
Initial Conditions:
 
Initiating Cues: STUDENT HANDOUT JPM-S8 Revision:
STUDENT HANDOUT JPMNumber:                    JPM-S8                                 Revision:         0/0 Initial Conditions: The "A" Circulating Water pump has just tripped on overload and the crew has entered AOP 2517, Circulating Water Malfunctions.
0/0 The "A" Circulating Water pump has just tripped on overload and the crew has entered AOP 2517, Circulating Water Malfunctions.
The plant is at 100% power, steady state, with all other systems and components are operating normally for the given conditions.
The plant is at 100% power, steady state, with all other systems and components are operating normally for the given conditions.
No liquid waste discharges are on progress.
No liquid waste discharges are on progress.
No sodium hypochlorite shocking of bays is in progress.
No sodium hypochlorite shocking of bays is in progress.
You are the Balance Of Plant (BOP) operator and have been instructed by the US to commence the actions of AOP 2517, Circulating Water Malfunctions, starting with step 3 .0, Initial Actions. 11 JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: Mitigate a Reactor Regulating System Failed T cow Input JPMNumber:
Initiating Cues:    You are the Balance Of Plant (BOP) operator and have been instructed by the US to commence the actions of AOP 2517, Circulating Water Malfunctions, starting with step 3 .0, Initial Actions.
JPM-S9 Revision:
11
010 Initiated:
 
Robert L. Cimmino, Jr. 02/03/2017 Developer Date Reviewed:
JOB PERFORMANCE MEASURE APPROVAL SHEET JPM
Will Chesnutt Technical Reviewer Date Approved:
 
Michael John Cote Supervisor, Nuclear Training Date 1
==Title:==
Mitigate a Reactor Regulating System Failed T cow Input JPMNumber: JPM-S9                                           Revision:     010 Initiated:
Robert L. Cimmino, Jr.                                 02/03/2017 Developer                                         Date Reviewed:
Will Chesnutt Technical Reviewer                                     Date Approved:
Michael John Cote Supervisor, Nuclear Training                               Date 1


==SUMMARY==
==SUMMARY==
OF CHANGES DATE DESCRIPTION REV/CHANGE 01/31/2017 rlc Created new JPM for 2017 NRG Re-Take Exam 010 2 JPM WORKSHEET Facility:
OF CHANGES DATE                           DESCRIPTION         REV/CHANGE 01/31/2017 rlc Created new JPM for 2017 NRG Re-Take Exam     010 2
MPUnit2 Examinee:
 
JPM Number: JPM-S9 Revision:
JPM WORKSHEET Facility:     MPUnit2                       Examinee:
0/0 Task Title: Mitigate a Reactor Regulating System Failed T coLo Input System: Reactor Regulating System Time Critical Task: DYES Validated Time (minutes):
JPM Number:                       JPM-S9                               Revision:     0/0 Task
10 Task Number(s):
 
NUTIMS 041-01-003 Applicable To: RO ---PEO ---SRO ---STA ----x KIA Number: 016/A4.0l KIA Rating: 2.9/2.8 --------Method of Testing: Simulated Performance:
==Title:==
Actual Performance:
Mitigate a Reactor Regulating System Failed T coLo Input System:             Reactor Regulating System Time Critical Task:                   DYES       ~NO Validated Time (minutes):               10 Task Number(s):                   NUTIMS 041-01-003 Applicable To:                 SRO
x Location:
                                    ---           STA - - - -               RO
Classroom:
                                                                                -- x-         PEO - - -
Simulator:
KIA Number:               016/A4.0l             KIA Rating:
x In-Plant:
                                                                - - -2.9/2.8 Method of Testing:           Simulated Performance:                                   Actual Performance:           x Location:                   Classroom:                         Simulator:         x                 In-Plant:
Task Standards:
Task Standards:                 The Examinee will use OP 2386, Reactor Regulating System, Section 4.2, "Removing (bypassing) Faulty Indication", to deselect a failed T cow input and restore system calculated outputs to normal.
The Examinee will use OP 2386, Reactor Regulating System, Section 4.2, "Removing (bypassing)
Required Materials:             OP 2386, "Reactor Regulating System" (procedures, equipment, etc.)   ARP 2590C-148, 'TAVG-TREF HI/LO" (C-04/DA-19)
Faulty Indication", to deselect a failed T cow input and restore system calculated outputs to normal. Required Materials:
OP 2386, "Reactor Regulating System" (procedures, equipment, etc.) ARP 2590C-148, 'TAVG-TREF HI/LO" (C-04/DA-19)
General  
General  


==References:==
==References:==
OP 2386, "Reactor Regulating System"
                                        *** READ TO THE EXAMINEE ***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
3


OP 2386, "Reactor Regulating System" *** READ TO THE EXAMINEE *** I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied.
JPM WORKSHEET JPMNumber:                   JPM-S9                         Revision:     0/0 Initial Conditions:             1. The Plant is at 100% power, steady state.
With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
: 2. Loop 1 Tcorn temperature transmitter, TE-111 Y, has failed to 614&deg;F.
3 JPM WORKSHEET JPMNumber:
: 3. I&C has been notified.
JPM-S9 Revision:
Initiating Cues:               1. You are the Balance Of Plant (BOP) operator.
0/0 Initial Conditions:
: 2. The Unit Supervisor has directed you to bypass the failed Tcorn input to the Reactor Regulating System IA W OP 2386, "Reactor Regulating System", Section 4.2, "Removing (bypassing) Faulty Indication".
Initiating Cues: Simulator Requirements:
Simulator Requirements:         1. Initialize the simulator to any steady state, 100% power IC.
: 1. The Plant is at 100% power, steady state. 2. Loop 1 Tcorn temperature transmitter, TE-111 Y, has failed to 614&deg;F. 3. I&C has been notified.
: 2. Enter malfunction RXOSA at 614&deg;F to fail TE-111 Y input to the RRS.
: 1. You are the Balance Of Plant (BOP) operator.
: 3. Acknowledge all alarms.
: 2. The Unit Supervisor has directed you to bypass the failed T corn input to the Reactor Regulating System IA W OP 2386, "Reactor Regulating System", Section 4.2, "Removing (bypassing)
: 4. On the BOP "Foxboro control PPC" application, select the "FEEDWATER HEATERS OVERVIEW" screen.
Faulty Indication".
                  ****NOTES TO TASK PERFORMANCE EVALUATOR****
: 1. Initialize the simulator to any steady state, 100% power IC. 2. Enter malfunction RXOSA at 614&deg;F to fail TE-111 Y input to the RRS. 3. Acknowledge all alarms. 4. On the BOP "Foxboro control PPC" application, select the "FEEDWATER HEATERS OVERVIEW" screen. ****NOTES TO TASK PERFORMANCE EVALUATOR****
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). 4 PERFORMANCE INFORMATION JPMNumber:
: 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
JPM-S9 Revision:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
0/0 Task Title: Mitigate a Reactor Regulating System T cow Input Failure START TIME: ___ _ STEP Performance:
4
Standard:
 
Critical:
PERFORMANCE INFORMATION JPMNumber:         JPM-S9                                                             Revision:       0/0 Task
Grade #1 OP Reactor Regulating System 1. Examinee references OP 2386, "Reactor YD NIZ! so uo 4.2 Removing (bypassing)
 
Faulty Indication Regulating System" (RRS), Section 4.2, "Removing (bypassing)
==Title:==
Faulty Indication" 2. Examinee uses any BOP computer work station to access the "Foxboro control PPC" application.
Mitigate a Reactor Regulating System T cow Input Failure START TIME: _ _ __
Cue: Comments:
STEP Performance:                                       Standard:                                               Critical:       Grade
All required actions in Steps 4.2.1 -4.2.6 are performed on the Foxboro control PPC interface to the Foxboro IA system. STEP Performance:
#1 OP 2386~ Reactor Regulating System                 1. Examinee references OP 2386, "Reactor             YD NIZ!         so uo 4.2 Removing (bypassing) Faulty Indication             Regulating System" (RRS), Section 4.2, "Removing (bypassing) Faulty Indication"
Standard:
: 2. Examinee uses any BOP computer work station to access the "Foxboro control PPC" application.
Critical:
Cue:
Grade #2 4.2.1 SELECT "Change Env" (Foxboro Examinee selects "Change Env" on the application.
Comments: All required actions in Steps 4.2.1 - 4.2.6 are performed on the Foxboro control PPC interface to the Foxboro IA system.
YD NIZ! so uo control PPC). Cue: Comments:
STEP Performance:                                       Standard:                                               Critical:       Grade
STEP Performance:
#2 4.2.1 SELECT "Change Env" (Foxboro                 Examinee selects "Change Env" on the application.     YD NIZ!         so uo control PPC).
Standard:
Cue:
Critical:
Comments:
Grade #3 4.2.2 SELECT "Reactor-Reg" (environment The RRS Instruments screen has been selected on YIZ! ND so uo selection screen PPC). the Foxboro control PPC. 4.2.3 CLICK on "OK." 4.2.4 SELECT "RRS Instruments" screen (Foxboro control PPC). Cue: Comments:
STEP Performance:                                       Standard:                                               Critical:       Grade
The RRS Instrument screen is labeled "REACTOR REGULATING  
#3 4.2.2 SELECT "Reactor-Reg" (environment           The RRS Instruments screen has been selected on       YIZ! ND         so uo selection screen PPC).                     the Foxboro control PPC.
& STEAM DUMP PROGRAM TEMPERATURE and PRESSURE INSTRUMENT SELECTION".
4.2.3 CLICK on "OK."
5 PERFORMANCE INFORMATION JPMNumber:
4.2.4 SELECT "RRS Instruments" screen (Foxboro control PPC).
JPM-S9 Revision:
Cue:
0/0 Task Title: Mitigate a Reactor Regulating System T COLD Input Failure STEP Performance:
Comments: The RRS Instrument screen is labeled "REACTOR REGULATING & STEAM DUMP PROGRAM TEMPERATURE and PRESSURE INSTRUMENT SELECTION".
Standard:
5
Critical:
 
Grade #4 NOTE Examinee reads and acknowledges the Note. YD N[8] so uo Removing a temperature input from the Selected Loop could cause Pressurizer level setpoint to change. Cue: If required, inform the examinee that the RO is monitoring pressurizer level control for any changes. Comments:
PERFORMANCE INFORMATION JPMNumber:         JPM-S9                                                             Revision:       0/0 Task
STEP Performance:
 
Standard:
==Title:==
Critical:
Mitigate a Reactor Regulating System TCOLD Input Failure STEP Performance:                                       Standard:                                               Critical: Grade
Grade #5 4.2.5 SELECT the input to be bypassed and Examinee CLICKS the "NORMAL" button under Yi:8] ND so uo PRESS the "NORMAL" button. the TE-lllY indication.
#4                       NOTE                         Examinee reads and acknowledges the Note.             YD N[8]   so uo Removing a temperature input from the Selected Loop could cause Pressurizer level setpoint to change.
Cue: If required, inform the examinee that the RO is monitoring pressurizer level control for any changes.
Comments:
STEP Performance:                                       Standard:                                               Critical: Grade
#5 4.2.5   SELECT the input to be bypassed and       Examinee CLICKS the "NORMAL" button under             Yi:8] ND   so uo PRESS the "NORMAL" button.                 the TE-lllY indication.
Cue: The button label for TE-111 Y must be changed from "NORMAL" to "BYPASSED" for the failed input to be successfully bypassed from the RRS output calculations.
Cue: The button label for TE-111 Y must be changed from "NORMAL" to "BYPASSED" for the failed input to be successfully bypassed from the RRS output calculations.
Comments:
Comments:
STEP Performance:
STEP Performance:                                       Standard:                                               Critical: Grade
Standard:
#6 4.2.6   OBSERVE that the "NORMAL" button           Examinee observes the TE-111 Y input is now           YD Ni:8]   so uo changed to "BYPASSED."                     bypassed.
Critical:
Cue:
Grade #6 4.2.6 OBSERVE that the "NORMAL" button Examinee observes the TE-111 Y input is now YD Ni:8] so uo changed to "BYPASSED." bypassed.
Comments: This completes the JPM.
Cue: Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
This completes the JPM. TERMINATION CUE: The evaluation for this JPM is concluded.
STOP TIME:
STOP TIME: 6 VERIFICATION OF .JPM COMPLETION JPMNumber:
6
JPM-S9 Revision:
 
0/0 Date Performed:
VERIFICATION OF .JPM COMPLETION JPMNumber:                             JPM-S9                                       Revision:         0/0 Date Performed:
Student: For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
Student:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. EVALUATION SECTION: Time Critical Task? D Yes D No Validated Time (minutes):
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
I 10 Actual Time to Complete (minutes):
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
I Work Practice Performance:
EVALUATION SECTION:
D SAT D UNSAT Operator Fundamentals:
Time Critical Task?                                 D   Yes   D   No Validated Time (minutes):               10         Actual Time to Complete (minutes):
D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question #1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:
I                                                                  I Work Practice Performance:                         D   SAT             D   UNSAT Operator Fundamentals:                             D   SAT             D   UNSAT JPM Question Portion Overall [NLO only]:           D   SAT             D   UNSAT               D   N/A Attached Question #1       D   SAT             D   UNSAT Attached Question #2       D   SAT             D   UNSAT Overall Result of JPM:                             D   SAT             D   UNSAT Evaluator:
Print I Sign Areas for Improvement I Comments:
Print I Sign Areas for Improvement I Comments:
7 JPMNumber:
7
Initial Conditions:
 
Initiating Cues: STUDENT HANDOUT JPM-S9 Revision:
STUDENT HANDOUT JPMNumber:          JPM-S9                                         Revision:           0/0 Initial Conditions: 1. The Plant is at 100% power, steady state.
0/0 1. The Plant is at 100% power, steady state. 2. Loop 1 T COLD temperature transmitter, TE-111 Y, has failed to 614&deg;F. 3. I&C has been notified.
: 2. Loop 1 T COLD temperature transmitter, TE-111 Y, has failed to 614&deg;F.
: 1. You are the Balance Of Plant (BOP) operator.
: 3. I&C has been notified.
: 2. The Unit Supervisor has directed you to bypass the failed T coLD input to the Reactor Regulating System IA WOP 2386, "Reactor Regulating System", Section 4.2, "Removing (bypassing)
Initiating Cues:   1. You are the Balance Of Plant (BOP) operator.
Faulty Indication".
: 2. The Unit Supervisor has directed you to bypass the failed T coLD input to the Reactor Regulating System IAWOP 2386, "Reactor Regulating System", Section 4.2, "Removing (bypassing) Faulty Indication".
8 JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: Transferring Computer UPS 480 V AC Main Power Supply JPMNumber:
8
JPM-Pl (JPM-116)
 
Revision:
JOB PERFORMANCE MEASURE APPROVAL SHEET JPM
5 Initiated:
 
John W. Riley (Signature on File) 01/23/2017 Developer Date Reviewed:
==Title:==
Will Chesnutt (Signature on File) 01127/2017 Technical Reviewer Date Approved:
Transferring Computer UPS 480 V AC Main Power Supply JPMNumber:   JPM-Pl (JPM-116)                         Revision:       5 Initiated:
Michael John Cote (Signature on File) 02/01/2017 Supervisor, Nuclear Training Date 1
John W. Riley (Signature on File)                   01/23/2017 Developer                                 Date Reviewed:
Will Chesnutt (Signature on File)                 01127/2017 Technical Reviewer                             Date Approved:
Michael John Cote (Signature on File)               02/01/2017 Supervisor, Nuclear Training                       Date 1


==SUMMARY==
==SUMMARY==
OF CHANGES DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format 310 06-11-07 (DAP) Verified JPM to comply with 2349A Rev 010-001. Made minor 310 changes to font and format but nothing of substance.
OF CHANGES DATE                               DESCRIPTION                         REV/CHANGE 2006-317         Update JPM to include HUP evaluations and new format             310 06-11-07 (DAP)   Verified JPM to comply with 2349A Rev 010-001. Made minor       310 changes to font and format but nothing of substance.
JWR 08-07-2012 Updated to new Format. Minor editorial changes. 311 07/22/2015  
JWR 08-07-2012   Updated to new Format. Minor editorial changes.                 311 07/22/2015 - RJA Updated to newest format and latest procedure revision.           4 1/16/17 jwr   Reviewed and validated for 201 7 NRC JPM exam. Changed Task       5 Number, minor changes some cues and initiating cue.
-RJA Updated to newest format and latest procedure revision.
2
4 1/16/17 jwr Reviewed and validated for 201 7 NRC JPM exam. Changed Task 5 Number, minor changes some cues and initiating cue. 2 JPM WORKSHEET Facility:
 
MP2 Examinee:
JPM WORKSHEET Facility:     MP2                           Examinee:
JPMNumber:
JPMNumber:                 JPM-Pl (JPM-116)                           Revision:       5 Task
JPM-Pl (JPM-116)
 
Revision:
==Title:==
5 Task Title: Transferring Computer UPS 480 V AC Main Power Supply System: Plant Process Computer Time Critical Task: DYES Validated Time (minutes):
Transferring Computer UPS 480 V AC Main Power Supply System:             Plant Process Computer Time Critical Task:                   DYES         ~NO Validated Time (minutes):
30 ------Task Number(s):
Task Number(s):                         083-01-030 Applicable To:               SRO       x         STA                     RO     x           PEO     x KIA Number:               062 A4.01              KIA Rating: - - -3.3/3.1-----
083-01-030 Applicable To: SRO x STA RO x PEO x KIA Number: KIA Rating: --------062 A4.01 3.3/3.1 Method of Testing: Simulated Performance:
Method of Testing:         Simulated Performance:             x                     Actual Performance:
x Actual Performance:
Location:                   Classroom:                           Simulator:                         In-Plant:     x Task Standards:                 At the completion of this JPM, the examinee has transferred the computer UPS main power supply from Facility 1 to Facility 2.
Location:
Required Materials:             OP 2349A, Plant Process Computer UPS System (procedures, equipment, etc.)
Classroom:
General  
Simulator:
In-Plant:
x Task Standards:
At the completion of this JPM, the examinee has transferred the computer UPS main power supply from Facility 1 to Facility 2. Required Materials:
OP 2349A, Plant Process Computer UPS System (procedures, equipment, etc.) General  


==References:==
==References:==
OP 2349A, Plant Process Computer UPS System
                                        *** READ TO THE EXAMINEE ***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
3


OP 2349A, Plant Process Computer UPS System *** READ TO THE EXAMINEE *** I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied.
JPM WORKSHEET JPMNumber:             JPM-Pl (JPM-116)                     Revision:         5 Initial Conditions:
With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
* The plant is at 100% power.
3 JPM WORKSHEET JPMNumber:
JPM-Pl (JPM-116)
Revision:
5 Initial Conditions:
* The plant is at 100% power. Initiating Cues:
* All systems are in a normal lineup.
* All systems are in a normal lineup.
* The computer uninterruptible power supply is being supplied from Facility 1.
* The computer uninterruptible power supply is being supplied from Facility 1.
* The Task Preview and Pre-job Brief have been completed.
* The Task Preview and Pre-job Brief have been completed.
Initiating Cues:
* The Unit Supervisor has directed you to transfer the computer UPS main power supply from Facility 1 to Facility 2 in accordance with OP 2349A, Section 4.8.
* The Unit Supervisor has directed you to transfer the computer UPS main power supply from Facility 1 to Facility 2 in accordance with OP 2349A, Section 4.8.
* The computer UPS main power supply is being swapped from Facility 1 to Facility 2 to support preventative maintenance on breaker B5238. Simulator Requirements:
* The computer UPS main power supply is being swapped from Facility 1 to Facility 2 to support preventative maintenance on breaker B5238.
NI A ****NOTES TO TASK PERFORMANCE EVALUATOR****
Simulator Requirements:       NIA
                ****NOTES TO TASK PERFORMANCE EVALUATOR****
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). 4 PERFORMANCE INFORMATION JPMNumber:
: 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
JPM-Pl (JPM-116)
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Revision:
4
5 Task Title: Transferring Computer UPS 480 V AC Main_Power  
 
&sect;upply STARTTIME: STEP Performance:
PERFORMANCE INFORMATION JPMNumber:         JPM-Pl (JPM-116)                                               Revision:       5 Task
Standard:
 
Critical:
==Title:==
Grade #1 OP 2349A, Section 4.8 Examinee reads and acknowledges the Note. YD N[gj so uo CA UT ION With safety switches, NB-5238 and NB-6245 open, computer power is supplied from computer battery. When computer battery is supplying power, positive operator action must be taken within 90 minutes to place computer UPS back on UPS inverter or alternate source. Cue: Provide examinee with a copy of OP 2349A, Plant Process Computer UPS System. Comments:
Transferring Computer UPS 480 V AC Main_Power &sect;upply STARTTIME:   ~~~-
STEP Performance:
STEP Performance:                                       Standard:                                           Critical:   Grade
Standard:
#1 OP 2349A, Section 4.8                             Examinee reads and acknowledges the Note.           YD   N[gj so uo CA UT ION With safety switches, NB-5238 and NB-6245 open, computer power is supplied from computer battery. When computer battery is supplying power, positive operator action must be taken within 90 minutes to place computer UPS back on UPS inverter or alternate source.
Critical:
Cue: Provide examinee with a copy of OP 2349A, Plant Process Computer UPS System.
Grade #2 4.8.1 IF transferring main power supply from Examinee proceeds to the Control Room Air YD N[gj so uo Facility 1 to Facility 2, PERFORM the Conditioning Room and observes breaker B6245, following: "computer uninterruptible power supply," is in the a. CHECK Facility 2 supply breaker, ON position.
Comments:
B6245, "computer uninterruptible power supply," closed (CRAC room). Cue: Breaker B6245 is in the ON (closed) position .. Comments:
STEP Performance:                                       Standard:                                           Critical:   Grade
5 PERFORMANCE INFORMATION JPM Number: JPM-Pl (JPM-116)
#2 4.8.1 IF transferring main power supply from       Examinee proceeds to the Control Room Air           YD   N[gj so uo Facility 1 to Facility 2, PERFORM the       Conditioning Room and observes breaker B6245, following:                                 "computer uninterruptible power supply," is in the
Revision:
: a. CHECK Facility 2 supply breaker,       ON position.
5 Task Title: Transferring C()mputer UPS 480 V AC Main Power Supply STEP Performance:
B6245, "computer uninterruptible power supply," closed (CRAC room).
Standard:
Cue: Breaker B6245 is in the ON (closed) position ..
Critical:
Comments:
Grade #3 b. CHECK computer battery, DB4A, Examinee locates CB-1 on DSOA (West DC so uo aligned to inverter with CB-1 closed switchgear room) and observes that the breaker is (DSOA). in the ON position.
5
 
PERFORMANCE INFORMATION JPM Number:       JPM-Pl (JPM-116)                                                 Revision:         5 Task
 
==Title:==
Transferring C()mputer UPS 480 V AC Main Power Supply STEP Performance:                                     Standard:                                               Critical:         Grade
#3
: b. CHECK computer battery, DB4A,         Examinee locates CB-1 on DSOA (West DC               YON~            so uo aligned to inverter with CB-1 closed   switchgear room) and observes that the breaker is (DSOA).                               in the ON position.
Cue: Breaker CB-1 is in the ON (closed) position.
Cue: Breaker CB-1 is in the ON (closed) position.
Comments: This area may be Protected. The preferred method to complete this step is to get the Shift Managers permission to enter the Protected Area. A photo maybe used to complete this step as an alternate method.
STEP Performance:                                      Standard:                                              Critical:        Grade
#4
: c. CHECK UPS not aligned to              Examinee observes that the red "ALTERNATE            YON~            so uo alternate source.                    SOURCE SUPPLYING LOAD" light on DSOA is NOT lit and I or the amber "INVERTER SUPPLYING LOAD" light is lit.
Cue: The red "ALTERNATE SOURCE SUPPLYING LOAD" light on DSOA is NOT lit and I or the amber "INVERTER SUPPLYING LOAD" light is lit.
Comments: This area may be Protected. The preferred method to complete this step is to get the Shift Managers permission to enter the Protected Area. A photo maybe used to complete this step as an alternate method.
6
PERFORMANCE INFORMATION JPMNumber:        JPM-Pl (JPM-116)                                              Revision:    5 Task
==Title:==
Transferring_!:;omput~r !JP~    480 VAC Main Power Supply STEP Performance:                                    Standard:                                        Critical:  Grade
#5
: d. PLACE safety switch, "computer      Examinee proceeds to the East DC Switchgear      Y[gj ND    so uo power safety switch NB-5238," to    Room and simulates placing switch NB-5238 to the "OFF" (East DC Switchgear          "OFF" position.
Room).
Cue: Switch NB-523 8 has been placed in the "OFF" position.
Comments:
Comments:
This area may be Protected.
STEP Performance:                                   Standard:                                         Critical: Grade
The preferred method to complete this step is to get the Shift Managers permission to enter the Protected Area. A photo maybe used to complete this step as an alternate method. STEP Performance:
#6
Standard:
: e. TURN and REMOVE Kirk-Key for        Examinee simulates turning and removing Kirk-    Y[gj ND    so uo safety switch, "computer power      Key for safety switch "computer power safety safety switch, NB-5238", (East DC  switch, NB-5238", (East DC Switchgear Room).
Critical:
Switchgear Room).
Grade #4 c. CHECK UPS not aligned to Examinee observes that the red "ALTERNATE so uo alternate source. SOURCE SUPPL YING LOAD" light on DSOA is NOT lit and I or the amber "INVERTER SUPPL YING LOAD" light is lit. Cue: The red "ALTERNATE SOURCE SUPPLYING LOAD" light on DSOA is NOT lit and I or the amber "INVERTER SUPPLYING LOAD" light is lit. Comments:
Cue: Kirk-Key for safety switch NB-5238 has been turned and the key has been removed.
This area may be Protected.
Comments:
The preferred method to complete this step is to get the Shift Managers permission to enter the Protected Area. A photo maybe used to complete this step as an alternate method. 6 PERFORMANCE INFORMATION JPMNumber:
STEP Performance:                                   Standard:                                         Critical: Grade
JPM-Pl (JPM-116)
#7
Revision:
: f. INSERT and TURN Kirk-key for        Examinee proceeds to the West DC Switchgear     Y[gj ND   so uo safety switch, "computer power      Room and simulates inserting the Kirk-key into safety switch, NB-6245" (West DC   safety switch NB-6245.
5 Task Title:
Switchgear Room).
480 V AC Main Power Supply STEP Performance:
Examinee simulates turning Kirk-Key for safety Y[gj ND    so uo switch NB-6245 ..
Standard:
Cue: The kirk-key has been inserted and turned.
Critical:
Grade #5 d. PLACE safety switch, "computer Examinee proceeds to the East DC Switchgear Y[gj ND so uo power safety switch NB-5238," to Room and simulates placing switch NB-5238 to the "OFF" (East DC Switchgear "OFF" position.
Room). Cue: Switch NB-523 8 has been placed in the "OFF" position.
Comments:
Comments:
STEP Performance:
7
Standard:
 
Critical:
PERFORMANCE INFORMATION JPM Number:         JPM-Pl (JPM-116)                                               Revision:         5 Task
Grade #6 e. TURN and REMOVE Kirk-Key for Examinee simulates turning and removing Kirk-Y[gj ND so uo safety switch, "computer power Key for safety switch "computer power safety safety switch, NB-5238", (East DC switch, NB-5238", (East DC Switchgear Room). Switchgear Room). Cue: Kirk-Key for safety switch NB-5238 has been turned and the key has been removed. Comments:
 
STEP Performance:
==Title:==
Standard:
Transferrin~omputer      UP&sect;_ 480 VA~ Ma!!J. ~_o'!er _&sect;upply STEP Performance:                                     Standard:                                               Critical:         Grade
Critical:
#8
Grade #7 f. INSERT and TURN Kirk-key for Examinee proceeds to the West DC Switchgear Y[gj ND so uo safety switch, "computer power Room and simulates inserting the Kirk-key into safety switch, NB-6245" (West DC safety switch NB-6245. Switchgear Room). Examinee simulates turning Kirk-Key for safety Y[gj ND so uo switch NB-6245 .. Cue: The kirk-key has been inserted and turned. Comments:
: g. PLACE safety switch, "computer       Examinee simulates placing safety switch,             Y~NO            so uo power safety switch, NB-6245," to   "computer power safety switch, NB-6245," to the "ON" (West DC Switchgear Room).     "ON" position.
7 PERFORMANCE INFORMATION JPM Number: JPM-Pl (JPM-116)
Revision:
5 Task Title:
UP&sect;_ 480 Ma!!J.
_&sect;upply STEP Performance:
Standard:
Critical:
Grade #8 g. PLACE safety switch, "computer Examinee simulates placing safety switch, so uo power safety switch, NB-6245," to "computer power safety switch, NB-6245," to the "ON" (West DC Switchgear Room). "ON" position.
Cue: "Computer power safety switch, NB-6245," is in the "ON" position.
Cue: "Computer power safety switch, NB-6245," is in the "ON" position.
Comments:
Comments:
STEP Performance:
STEP                                                                                                                             Grade Performance:                                     Standard:                                               Critical:
Standard:
#9
Critical:
: h. IF UPS inverter operating,           Examinee observes the following:                       YON~            so uo OBSERVE the following (D50A):
Grade #9 h. IF UPS inverter operating, Examinee observes the following:
* Amber "IN SYNC" light, lit
so uo OBSERVE the following (D50A):
* Amber "IN SYNC" light is lit
* Amber "IN SYNC" light is lit
* Amber "IN SYNC" light, lit
* Amber "INVERTER
* Amber "INVERTER SUPPLYING LOAD"
* Amber "INVERTER SUPPLYING LOAD" light is lit SUPPLYING LOAD" light lit
* Amber "INVERTER light is lit SUPPL YING LOAD" light lit
* Red  "BATTERY CURRENT"
* Red "BATTERY CURRENT" light is NOT lit.
* Red "BATTERY CURRENT" light is NOT lit.
* Red "BATTERY CURRENT" light not lit. Cue:
light not lit.
Cue:
* Amber "IN SYNC" light is lit
* Amber "IN SYNC" light is lit
* Amber "INVERTER SUPPLYING LOAD" light is lit
* Amber "INVERTER SUPPLYING LOAD" light is lit
* Red "BATTERY CURRENT" light is NOT lit. Comments:
* Red "BATTERY CURRENT" light is NOT lit.
This area may be Protected.
Comments: This area may be Protected. The preferred method to complete this step is to get the Shift Managers permission to enter the Protected Area. A photo maybe used to complete this step as an alternate method.
The preferred method to complete this step is to get the Shift Managers permission to enter the Protected Area. A photo maybe used to complete this step as an alternate method. TERMINATION CUE: The evaluation for this JPM is concluded.
TERMINATION CUE: The evaluation for this JPM is concluded.
STOP TIME: __ _ 8 VERIFICATION OF JPM COMPLETION JPMNumber:
STOP TIME: _ __
JPM-Pl (JPM-116)
8
Revision:
 
5 Date Performed:
VERIFICATION OF JPM COMPLETION JPMNumber:                         JPM-Pl (JPM-116)                                   Revision:           5 Date Performed:
Student: For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
Student:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. EVALUATION SECTION: Time Critical Task? D Yes [gj No Validated Time (minutes):
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
I 30 Actual Time to Complete (minutes):
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
I Work Practice Performance:
EVALUATION SECTION:
D SAT D UNSAT Operator Fundamentals:
Time Critical Task?                                 D   Yes [gj No Validated Time (minutes):               30         Actual Time to Complete (minutes):
D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question # 1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:
I                                                                  I Work Practice Performance:                         D   SAT             D   UNSAT Operator Fundamentals:                             D   SAT             D   UNSAT JPM Question Portion Overall [NLO only]:           D   SAT             D   UNSAT               D   N/A Attached Question # 1       D   SAT             D   UNSAT Attached Question #2       D   SAT             D   UNSAT Overall Result of JPM:                             D   SAT             D   UNSAT Evaluator:
Print I Sign Areas for Improvement I Comments:
Print I Sign Areas for Improvement I Comments:
9 JPMNumber:
9
Initial Conditions:
 
Initiating Cues: STUDENT HANDOUT JPM-Pl (JPM-116)
STUDENT HANDOUT JPMNumber:            JPM-Pl (JPM-116)                             Revision:         5 Initial Conditions:
Revision:
5
* The plant is at 100% power.
* The plant is at 100% power.
* All systems are in a normal lineup.
* All systems are in a normal lineup.
* The computer uninterruptible power supply is being supplied from Facility 1.
* The computer uninterruptible power supply is being supplied from Facility 1.
* The Task Preview and Pre-job Brief have been completed.
* The Task Preview and Pre-job Brief have been completed.
Initiating Cues:
* The Unit Supervisor has directed you to transfer the computer UPS main power supply from Facility 1 to Facility 2 in accordance with OP 2349A, Section 4.8.
* The Unit Supervisor has directed you to transfer the computer UPS main power supply from Facility 1 to Facility 2 in accordance with OP 2349A, Section 4.8.
* The computer UPS main power supply is being swapped from Facility 1 to Facility 2 to support preventative maintenance on breaker B5238. 10 JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: Swapping "B" Service Water Strainer from Facility 1 to Facility 2 JPMNumber:
* The computer UPS main power supply is being swapped from Facility 1 to Facility 2 to support preventative maintenance on breaker B5238.
JPM-P2 Revision:
10
0 Initiated:
 
John W. Riley (Signature on File) 01/24/2017 Developer Date Reviewed:
JOB PERFORMANCE MEASURE APPROVAL SHEET JPM
Will Chesnutt (Signature on File) 01/27/2017 Technical Reviewer Date Approved:
 
Michael John Cote (Signature on File) 02/01/2017 Supervisor, Nuclear Training Date 1
==Title:==
Swapping "B" Service Water Strainer from Facility 1 to Facility 2 JPMNumber:   JPM-P2                                       Revision:         0 Initiated:
John W. Riley (Signature on File)                       01/24/2017 Developer                                       Date Reviewed:
Will Chesnutt (Signature on File)                       01/27/2017 Technical Reviewer                                   Date Approved:
Michael John Cote (Signature on File)                   02/01/2017 Supervisor, Nuclear Training                             Date 1


==SUMMARY==
==SUMMARY==
OF CHANGES DATE DESCRIPTION REV/CHANGE 01/24/2017 jwr Initial issue JPM. Similar to JPM-123. Written for the 2017 ILT 0 NRC JPM exam. JPM-123 used the operating procedure.
OF CHANGES DATE                               DESCRIPTION                           REV/CHANGE 01/24/2017 jwr Initial issue JPM. Similar to JPM-123. Written for the 2017 ILT     0 NRC JPM exam. JPM-123 used the operating procedure. This JPM uses the Loss of Vital 480 VAC Bus 22E AOP; 2503E.
This JPM uses the Loss of Vital 480 VAC Bus 22E AOP; 2503E. 2 JPM WORKSHEET Facility:
2
MP2 Examinee:
 
JPMNumber:
JPM WORKSHEET Facility:     MP2                           Examinee:
JPM-P2 Revision:
JPMNumber:                         JPM-P2                               Revision: - -
0 ----Task Title: Swapping "B" Service Water Strainer from Facility 1 to Facility 2 System: Service Water Time Critical Task: DYES k?S1 NO Validated Time (minutes):
Task
10 ------Task Number(s):
 
000-04-018 Applicable To: STA RO PEO x SRO ---x x 076/A2.0l KIA Rating: --------3.5/3.7 KIA Number: Method of Testing: Simulated Performance:
==Title:==
x Actual Performance:
Swapping "B" Service Water Strainer from Facility 1 to Facility 2 System:             Service Water Time Critical Task:                   DYES       k?S1 NO Validated Time (minutes):
Location:
Task Number(s):                         000-04-018 Applicable To:               SRO
Classroom:
                                    -- x-         STA                      RO      x         PEO      x KIA Rating:
Simulator:
KIA Number:                076/A2.0l                             - - -3.5/3.7 Method of Testing:         Simulated Performance:             x                     Actual Performance:
In-Plant:
Location:                   Classroom:                           Simulator:                         In-Plant:     x Task Standards:                 At the completion of this JPM, the examinee has simulated swapping the "B" service water strainer power supply from Facility 1 to Facility 2.
x Task Standards:
Required Materials:             AOP 2503E, Loss of Vital 480 V AC Bus 22E (procedures, equipment, etc.)
At the completion of this JPM, the examinee has simulated swapping the "B" service water strainer power supply from Facility 1 to Facility 2. Required Materials:
General  
AOP 2503E, Loss of Vital 480 V AC Bus 22E (procedures, equipment, etc.) General  


==References:==
==References:==
AOP 2503E, Loss of Vital 480 V AC Bus 22E
                                        *** READ TO THE EXAMINEE ***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
3


AOP 2503E, Loss of Vital 480 V AC Bus 22E *** READ TO THE EXAMINEE *** I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied.
JPM WORKSHEET JPMNumber:                   JPM-P2                         Revision:         0 Initial Conditions:
With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
* The plant is at 100% power.
3 JPM WORKSHEET JPMNumber:
JPM-P2 Revision:
0 Initial Conditions:
* The plant is at 100% power. Initiating Cues:
* A loss of 480 volt electrical bus 22E has occurred.
* A loss of 480 volt electrical bus 22E has occurred.
* The crew has entered AOP 2503E, "Loss of Vital 480 VAC Bus 22E".
* The crew has entered AOP 2503E, "Loss of Vital 480 VAC Bus 22E".
* The crew is performing step 3 .18 to place the "B" SW pump in service on facility 1.
* The crew is performing step 3 .18 to place the "B" SW pump in service on facility 1.
* The crew has completed all steps through 3.18.e. The "B" SW pump is operating and the "A" SW pump has been stopped.
* The crew has completed all steps through 3.18.e. The "B" SW pump is operating and the "A" SW pump has been stopped.
Initiating Cues:
* The Unit Supervisor has directed you to swap the "B" service water strainer power supply from Facility 1 to Facility 2 in accordance with AOP 2503E, step 3.18.f.
* The Unit Supervisor has directed you to swap the "B" service water strainer power supply from Facility 1 to Facility 2 in accordance with AOP 2503E, step 3.18.f.
* The examiner will act as the US as needed. Simulator Requirements:
* The examiner will act as the US as needed.
NIA * * * *NOTES TO TASK PERFORMANCE EV ALU ATOR* * *
Simulator Requirements:       NIA
* 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
                  * * * *NOTES TO TASK PERFORMANCE EVALU ATOR* * * *
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). 4 PERFORMANCE INFORMATION JPMNumber:
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
JPM-P2 Revision:
: 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
0 Task Title: Swapping "B" Service Water Strainer from Facility 1 to Facility 2 START TIME: ----STEP Performance:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Standard:
4
Critical:
 
Grade #1 3 .18.f DISPATCH Operator to intake structure The examinee locates the "B" Service water Ycgj ND so uo to ENSURE "B" service water strainer Strainer control switch on the middle, left of the powered from facility 2, as follows: "B" Service Water Pump Discharge Strainer 1) PLACE "B" SW strainer control Control panel LIB (C58B), and simulates placing switch to "OFF." it to the "OFF" position.
PERFORMANCE INFORMATION JPMNumber:         JPM-P2                                                             Revision:       0 Task
 
==Title:==
Swapping "B" Service Water Strainer from Facility 1 to Facility 2 START TIME:   ----
STEP Performance:                                       Standard:                                               Critical:       Grade
#1 3 .18.f DISPATCH Operator to intake structure     The examinee locates the "B" Service water             Ycgj ND         so uo to ENSURE "B" service water strainer     Strainer control switch on the middle, left of the powered from facility 2, as follows:     "B" Service Water Pump Discharge Strainer Control panel LIB (C58B), and simulates placing
: 1) PLACE "B" SW strainer control it to the "OFF" position.
switch to "OFF."
Cue: "B" SW strainer control switch is in "OFF" position.
Cue: "B" SW strainer control switch is in "OFF" position.
Comments: The best way to administer this JPM is to have both the examiner and examinee stand on the floor using a flashlight and laser pointer. The examinee can climb the ladder and look at the panel but there is not enough room for the examinee and examiner on the platform. And it could be unsafe for the examinee to tum on the platform to communicate with the examiner.
STEP Performance:                                      Standard:                                                Critical:        Grade
#2
: 2) OPEN "Zl" knife switch.                The examinee locates the "B" Service Water            Ycgj ND        so uo Strainer "Z l" knife switch on the right side of the "B" Service Water Pump Discharge Strainer Control panel LIB (C58B), and simulates placing it in the "OFF" position.
Cue: "Zl" knife switch is in the "OFF" position.
Comments:
Comments:
The best way to administer this JPM is to have both the examiner and examinee stand on the floor using a flashlight and laser pointer. The examinee can climb the ladder and look at the panel but there is not enough room for the examinee and examiner on the platform.
5
And it could be unsafe for the examinee to tum on the platform to communicate with the examiner.
 
STEP Performance:
PERFORMANCE INFORMATION JPMNumber:      JPM-P2                                                                Revision:    0 Task
Standard:
 
Critical:
==Title:==
Grade #2 2) OPEN "Zl" knife switch. The examinee locates the "B" Service Water Ycgj ND so uo Strainer "Z l" knife switch on the right side of the "B" Service Water Pump Discharge Strainer Control panel LIB (C58B), and simulates placing it in the "OFF" position.
Swapping~B"      Service Water Strainer from Facility 1toFacility2 STEP Performance:                                        Standard:                                            Critical:  Grade
Cue: "Zl" knife switch is in the "OFF" position.
#3
: 3) ROTATE and REMOVE Kirk-key.
* The examinee locates the Kirk-key in the lock  Y[gj ND    so uo for the Zl knife switch, and simulates rotating it 90&deg; to lock the Zl knife switch.
* Examinee simulates removing the Kirk-key .      Y[gj ND    so uo Cue: The Zl Kirk-key has been rotated and removed.
Comments:
STEP Performance:                                                                                             Critical:  Grade Standard:
#4
: 4) INSERT Kirk-key in Z2 lock.             The examinee locates the Kirk-key lock for the Z2  Y[gj ND   so uo knife switch and simulates inserting the Kirk-key into the Z2 lock.
Cue: The Kirk key has been inserted into the Facility 2 key lock switch.
Comments:
Comments:
5 PERFORMANCE INFORMATION JPMNumber:
STEP Performance:                                       Standard:                                           Critical: Grade
JPM-P2 Revision:
#5
0 Task Title:
: 5) UNLOCK and CLOSE Z2 knife               The examinee simulates unlocking the Kirk key       Y[gj ND   so uo switch.                                 lock for the Z2 knife switch, and simulates closing the Z2 knife switch ("ON" position).
Service Water Strainer from Facility 1toFacility2 STEP Performance:
Standard:
Critical:
Grade #3 3) ROTATE and REMOVE Kirk-key.
* The examinee locates the Kirk-key in the lock Y[gj ND so uo for the Zl knife switch, and simulates rotating it 90&deg; to lock the Zl knife switch.
* Examinee simulates removing the Kirk-key . Y[gj ND so uo Cue: The Zl Kirk-key has been rotated and removed. Comments:
STEP Performance:
Standard:
Critical:
Grade #4 4) INSERT Kirk-key in Z2 lock. The examinee locates the Kirk-key lock for the Z2 Y[gj ND so uo knife switch and simulates inserting the Kirk-key into the Z2 lock. Cue: The Kirk key has been inserted into the Facility 2 key lock switch. Comments:
STEP Performance:
#5 Standard:
Critical:
Grade 5) UNLOCK and CLOSE Z2 knife The examinee simulates unlocking the Kirk key Y[gj ND so uo switch. lock for the Z2 knife switch, and simulates closing the Z2 knife switch ("ON" position).
Cue: The Z2 Kirk key switch is unlocked and the knife switch is closed ("ON" position).
Cue: The Z2 Kirk key switch is unlocked and the knife switch is closed ("ON" position).
Comments:
Comments:
6 PERFORMANCE INFORMATION JPMNumber:
6
JPM-P2 Revision:
 
0 Task Title: Swapping "B" Water Strainer from Facility 1toFacility2 STEP Performance:
PERFORMANCE INFORMATION JPMNumber:       JPM-P2                                                           Revision:     0 Task
Standard:
 
Critical:
==Title:==
Grade #6 6) PRESS "CLOSE" on strainer control The examinee simulates pressing "CLOSE" on Y[gj ND so uo panel (west side above Z2 knife strainer control panel (west side above Z2 knife switch). switch). Cue: "CLOSE" on strainer control panel has been pressed. Comments:
Swapping "B"     S~rvi~e Water Strainer from Facility 1toFacility2 STEP Performance:                                     Standard:                                           Critical:   Grade
STEP Performance:
#6
Standard:
: 6) PRESS "CLOSE" on strainer control     The examinee simulates pressing "CLOSE" on         Y[gj ND     so uo panel (west side above Z2 knife     strainer control panel (west side above Z2 knife switch).                             switch).
Critical:
Cue: "CLOSE" on strainer control panel has been pressed.
Grade #7 7) PLACE "B" SW strainer control Examinee simulates placing "B" SW strainer Y[gj ND so uo switch in "AUTO." control switch in "AUTO. Cue: The "B" SW strainer control switch is in "AUTO. Comments:
Comments:
STEP Performance:                                     Standard:                                           Critical:   Grade
#7
: 7) PLACE "B" SW strainer control         Examinee simulates placing "B" SW strainer         Y[gj ND     so uo switch in "AUTO."                   control switch in "AUTO.
Cue: The "B" SW strainer control switch is in "AUTO.
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
TERMINATION CUE: The evaluation for this JPM is concluded.
STOP TIME: ----7 VERIFICATION OF JPM COMPLETION JPM Number: JPM-P2 Revision:
STOP TIME: - - - -
0 Date Performed:
7
Student: For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
 
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. EVALUATION SECTION: Time Critical Task? 0 Yes Validated Time (minutes):
VERIFICATION OF JPM COMPLETION JPM Number:                             JPM-P2                                       Revision:           0 Date Performed:
I 10 Actual Time to Complete (minutes):
Student:
I Work Practice Performance:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
D SAT D UNSAT Operator Fundamentals:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question #1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:
EVALUATION SECTION:
Time Critical Task?                                 0   Yes ~No Validated Time (minutes):               10         Actual Time to Complete (minutes):
I                                                                  I Work Practice Performance:                         D   SAT             D   UNSAT Operator Fundamentals:                             D   SAT             D   UNSAT JPM Question Portion Overall [NLO only]:           D   SAT             D   UNSAT               D   N/A Attached Question #1       D   SAT             D   UNSAT Attached Question #2       D   SAT             D   UNSAT Overall Result of JPM:                             D   SAT             D   UNSAT Evaluator:
Print I Sign Areas for Improvement I Comments:
Print I Sign Areas for Improvement I Comments:
8 JPMNumber:
8
Initial Conditions:
 
Initiating Cues: STUDENT HANDOUT JPM-P2 Revision:
STUDENT HANDOUT JPMNumber:                  JPM-P2                                 Revision:           0 Initial Conditions:
0
* The plant is at 100% power.
* The plant is at 100% power.
* A loss of 480 volt electrical bus 22E has occurred.
* A loss of 480 volt electrical bus 22E has occurred.
Line 2,338: Line 3,031:
* The crew is performing step 3 .18 to place the "B" SW pump in service on Facility 1.
* The crew is performing step 3 .18 to place the "B" SW pump in service on Facility 1.
* The crew has completed all steps through 3 .18.e. The "B" SW pump is operating and the "A" SW pump has been stopped.
* The crew has completed all steps through 3 .18.e. The "B" SW pump is operating and the "A" SW pump has been stopped.
Initiating Cues:
* The Unit Supervisor has directed you to swap the "B" service water strainer power supply from Facility 1 to Facility 2 in accordance with AOP 2503, step 3.18.f.
* The Unit Supervisor has directed you to swap the "B" service water strainer power supply from Facility 1 to Facility 2 in accordance with AOP 2503, step 3.18.f.
* The examiner will act as the US as needed. 9 JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: Shift from "A" to "B" Waste Gas Decay Tank JPMNumber:
* The examiner will act as the US as needed.
JPM-P3 (JPM-225)
9
Revision:
 
2 Initiated:
JOB PERFORMANCE MEASURE APPROVAL SHEET JPM
John W. Riley (Signature on File) 1/18117 Developer Date Reviewed:
 
Will Chesnutt (Signature on File) 01/27/2017 Technical Reviewer Date Approved:
==Title:==
Michael John Cote (Signature on File) 02/01/2017 Supervisor, Nuclear Training Date 1
Shift from "A" to "B" Waste Gas Decay Tank JPMNumber:   JPM-P3 (JPM-225)                           Revision:       2 Initiated:
John W. Riley (Signature on File)                     1/18117 Developer                                   Date Reviewed:
Will Chesnutt (Signature on File)                   01/27/2017 Technical Reviewer                               Date Approved:
Michael John Cote (Signature on File)                 02/01/2017 Supervisor, Nuclear Training                         Date 1


==SUMMARY==
==SUMMARY==
OF CHANGES DATE DESCRIPTION REV/CHANGE 10/20/08 Revised JPM for LOIT 2008 NRC Exam 110 01102109 Incorporated NRC Post-Validation comments 1/0 01/17/2017 jwr Updated to the latest format in preparation for the 2017 NRC JPM 210 exam. Made changes due to procedure changes. 2 JPM WORKSHEET Facility:
OF CHANGES DATE                                 DESCRIPTION                           REV/CHANGE 10/20/08   Revised JPM for LOIT 2008 NRC Exam                                   110 01102109   Incorporated NRC Post-Validation comments                             1/0 01/17/2017 jwr Updated to the latest format in preparation for the 2017 NRC JPM     210 exam. Made changes due to procedure changes.
l\1P2 Examinee:
2
JPMNumber:
 
JPM-P3 (JPM-225)
JPM WORKSHEET Facility:     l\1P2                         Examinee:
Revision:
JPMNumber:                 JPM-P3 (JPM-225)                           Revision:
2/0 ---Task Title: Shift from "A" to "B" Waste Gas Decay Tank System: Gaseous Radwaste Time Critical Task: DYES Validated Time (minutes):
                                                                                    - 2/0 Task
25 ------Task Number(s):
 
071-01-035 Applicable To: SRO ---STA ----RO ---PEO x x x KIA Number: 071 A4.05 KIA Rating: 2.6*/2.6*  
==Title:==
--------Method of Testing: Simulated Performance:
Shift from "A" to "B" Waste Gas Decay Tank System:             Gaseous Radwaste Time Critical Task:                   DYES       ~NO Validated Time (minutes):
x Actual Performance:
Task Number(s):                         071-01-035 Applicable To:               SRO
Location:
                                      -- x-         STA - - - -             RO
Classroom:
                                                                                -- x-         PEO     x KIA Number:               071 A4.05             KIA Rating:           2.6*/2.6*
Simulator:
Method of Testing:         Simulated Performance:             x                     Actual Performance:
In-Plant:
Location:                   Classroom:                           Simulator:                         In-Plant:     x Task Standards:                 At the completion of this JPM the examinee has shifted from the "A" Waste Gas Decay Tank in service to the "B" Waste Gas Decay Tank in service.
x Task Standards:
Required Materials:             Waste Gas System, OP 2337, Section 4.2 (procedures, equipment, etc.)
At the completion of this JPM the examinee has shifted from the "A" Waste Gas Decay Tank in service to the "B" Waste Gas Decay Tank in service. Required Materials:
General  
Waste Gas System, OP 2337, Section 4.2 (procedures, equipment, etc.) General  


==References:==
==References:==
Waste Gas System, OP 2337, Section 4.2
                                        ***READ TO THE EXAMINEE ***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as ifthe evolution was actually being performed.
3


Waste Gas System, OP 2337, Section 4.2 ***READ TO THE EXAMINEE *** I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied.
JPM WORKSHEET JPMNumber:             JPM-P3 (JPM-225)                   Revision:         2/0 Initial Conditions:
With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as ifthe evolution was actually being performed.
3 JPM WORKSHEET JPMNumber:
JPM-P3 (JPM-225)
Revision:
2/0 Initial Conditions:
Initiating Cues: Simulator Requirements:
* The "A" Waste Gas Decay Tank is in service.
* The "A" Waste Gas Decay Tank is in service.
* The "A" Waste Gas Decay Tank pressure indicates 137 psig.
* The "A" Waste Gas Decay Tank pressure indicates 137 psig.
Line 2,380: Line 3,074:
* All prerequisites are met.
* All prerequisites are met.
* The Task Preview and Pre-job Brief have been completed.
* The Task Preview and Pre-job Brief have been completed.
The US has directed you to remove the "A" Waste Gas Decay Tank from service and place the "B" Waste Gas Decay Tank in service. NIA * * **NOTES TO TASK PERFORMANCE EVALUATOR****
Initiating Cues:              The US has directed you to remove the "A" Waste Gas Decay Tank from service and place the "B" Waste Gas Decay Tank in service.
Simulator Requirements:        NIA
                  * * **NOTES TO TASK PERFORMANCE EVALUATOR****
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). 4 PERFORMANCE INFORMATION JPMNumber:
: 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
JPM-P3 Revision:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
2/0 Task Title: Shift from "A" to "B" Waste Gas Decay Tank START TIME: ___ _ STEP Performance:
4
Standard:
 
Critical:
PERFORMANCE INFORMATION JPMNumber:           JPM-P3   (JPM-2~5)                                            Revision:   2/0 Task
Grade #1 OP 2337, Section 4.2, NOTE: Examinee reads and acknowledges NOTE prior to YD N[gj so uo 1. The following Section shifts any of the section 4.2, "Shifting Waste Gas Decay Tanks." following waste gas decay tanks ("A" through "F"): 2. When using this Section, the last designator is written in the box next to the component's identification number on a copy of this Section. Cue: Provide the examinee with OP 2337, Gaseous Radwaste System, prerequisites and precautions (pages 1-4) and section 4.2 Shifting Waste Gas Decay Tanks (pages 8-10). Comments:
 
STEP Performance:
==Title:==
Standard:
Shift from "A" to "B" Waste Gas Decay Tank START TIME: _ _ __
Critical:
STEP Performance:                                     Standard:                                             Critical:         Grade
Grade #2 OP 2337, Section 4.2, NOTE: Examinee reads and acknowledges NOTE at the YD N[gj so uo Waste Gas Decay Tanks are normally shifted start of section 4.2, "Shifting Waste Gas Decay when the gas pressure in the in service Waste Tanks." Gas Decay Tank reaches 135 to 140 psig. Cue: Comments:
#1 OP 2337, Section 4.2, NOTE:                       Examinee reads and acknowledges NOTE prior to       YD     N[gj       so uo section 4.2, "Shifting Waste Gas Decay Tanks."
5 PERFORMANCE INFORMATION JPMNumber:
: 1. The following Section shifts any of the following waste gas decay tanks ("A" through "F"):
JPM-P3 (JPM-225)
: 2. When using this Section, the last designator is written in the box next to the component's identification number on a copy of this Section.
Revision:
Cue: Provide the examinee with OP 2337, Gaseous Radwaste System, prerequisites and precautions (pages 1-4) and section 4.2 Shifting Waste Gas Decay Tanks (pages 8-10).
2/0 Task Title: Shift from "A" to "B" Waste Gas Decay Tank STEP Performance:
Comments:
Standard:
STEP Performance:                                     Standard:                                             Critical:         Grade
Critical:
#2 OP 2337, Section 4.2, NOTE:                       Examinee reads and acknowledges NOTE at the         YD     N[gj       so uo start of section 4.2, "Shifting Waste Gas Decay Waste Gas Decay Tanks are normally shifted Tanks."
Grade #3 4.2.1 MARK the boxes in step 4.2.6 with the Examinee records the letter "A" in the boxes YD N[8J so uo letter designator of the valve identification associated with step 4.2.6. number of the Waste Gas Decay Tank being removed from service. Cue: Comments:
when the gas pressure in the in service Waste Gas Decay Tank reaches 135 to 140 psig.
STEP Performance:
Cue:
Standard:
Comments:
Critical:
5
Grade #4 4.2.2 MARK the boxes in step 4.2.8 with the Examinee records the letter "B" in the boxes YD N[8J so uo letter designator of the valve identification associated with step 4.2.8. number of the Waste Gas Decay Tank which is to be placed in service. Cue: Comments:
 
6 PERFORMANCE INFORMATION JPM Number: JPM-P3 (JPM-225)
PERFORMANCE INFORMATION JPMNumber:         JPM-P3 (JPM-225)                                                   Revision: 2/0 Task
Revision:
 
2/0 Task Title: Shift from "A" to "B" Waste Gas Decay Tank STEP Performance:
==Title:==
Standard:
Shift from "A" to "B" Waste Gas Decay Tank STEP Performance:                                       Standard:                                         Critical: Grade
Critical:
#3 4.2.1 MARK the boxes in step 4.2.6 with the letter designator of the valve identification Examinee records the letter "A" in the boxes     YD   N[8J so uo associated with step 4.2.6.
Grade #5 4.2.3 CIRCLE position of Waste Gas Examinee locates the handswitches for the "A" and Y0Nl:8J so uo Compressor hand switches (C-61 ): "B" Waste Gas Compressors on Panel C-61 and
number of the Waste Gas Decay Tank being removed from service.
* HS-9188, "WASTE GAS records the position of the handswitches in the COMPRESSOR F-lA" appropriate space. OFF AUTO STANDBY
Cue:
* HS-9189, "WASTE GAS COMPRESSORF-lB" OFF AUTO STANDBY Cue: Comments:
Comments:
STEP Performance:
STEP Performance:                                       Standard:                                         Critical: Grade
Standard:
#4 4.2.2 MARK the boxes in step 4.2.8 with the         Examinee records the letter "B" in the boxes     YD   N[8J so uo letter designator of the valve identification associated with step 4.2.8.
Critical:
number of the Waste Gas Decay Tank which is to be placed in service.
Grade #6 4.2.4 WRlTE in-service Waste Gas Decay Tank Examinee writes in the in-service Waste Gas YD N(g] so uo pressure ps1g Decay Tank pressure as 137 psig. This was provided in the initial conditions.
Cue:
Cue: Comments:
Comments:
7 PERFORMANCE INFORMATION JPM Number: JPM-P3 (JPM-225)
6
Revision:
 
2/0 Task Title: Shift from "A" to "B" Waste Gas Decay Tank STEP Performance:
PERFORMANCE INFORMATION JPM Number:       JPM-P3 (JPM-225)                                             Revision:   2/0 Task
Standard:
 
Critical:
==Title:==
Grade #7 4.2.5 ENSURE the following in "OFF" (C-61): Examinee states he/she would place both "A" and so uo
Shift from "A" to "B" Waste Gas Decay Tank STEP Performance:                                 Standard:                                         Critical: Grade
* HS-9188, "WASTE GAS "B" Waste Gas Compressor handswitches in the COMPRESSOR F-lA" OFF position.
#5 4.2.3 CIRCLE position of Waste Gas           Examinee locates the handswitches for the "A" and Y0Nl:8J   so uo Compressor hand switches (C-61 ):     "B" Waste Gas Compressors on Panel C-61 and records the position of the handswitches in the
* HS-9188, "WASTE GAS appropriate space.
COMPRESSOR F-lA" OFF       AUTO       STANDBY
* HS-9189, "WASTE GAS COMPRESSORF-lB" OFF       AUTO       STANDBY Cue:
Comments:
STEP Performance:                                 Standard:                                         Critical: Grade
#6 4.2.4 WRlTE in-service Waste Gas Decay Tank Examinee writes in the in-service Waste Gas       YD N(g]   so uo pressure       ps1g                   Decay Tank pressure as 137 psig. This was provided in the initial conditions.
Cue:
Comments:
7
 
PERFORMANCE INFORMATION JPM Number:     JPM-P3 (JPM-225)                                               Revision: 2/0 Task
 
==Title:==
Shift from "A" to "B" Waste Gas Decay Tank STEP Performance:                                   Standard:                                       Critical: Grade
#7 4.2.5 ENSURE the following in "OFF" (C-61):   Examinee states he/she would place both "A" and Y~NO      so uo "B" Waste Gas Compressor handswitches in the
* HS-9188, "WASTE GAS OFF position.
COMPRESSOR F-lA"
* HS-9189, "WASTE GAS COMPRESSOR F-lB" Cue: Both Waste Gas Compressor handswitches are in the OFF position.
* HS-9189, "WASTE GAS COMPRESSOR F-lB" Cue: Both Waste Gas Compressor handswitches are in the OFF position.
Comments:
Comments:
8 STEP #8 PERFORMANCE INFORMATION JPMNumber:
8
JPM-P3 (JPM-225)
 
Revision:
PERFORMANCE INFORMATION JPMNumber:         JPM-P3 (JPM-225)                                                     Revision:     2/0 Task
Task Title: Shift from "A" to "B" Waste Gas Decay Tank Performance:
 
4.2.6 For Waste Gas Decay Tank being removed from service, CLOSE the following valves: Cue:
==Title:==
* 2-GR-6.lA, "DECAY TK (T-19A) INLET V ALVE"(C-61)
Shift from "A" to "B" Waste Gas Decay Tank STEP Performance:                                         Standard:                                              Critical:        Grade
* 2-GR-6A, "A DECAY TANK INLET STOP" (-25'6" Auxiliary Building)
#8 4.2.6 For Waste Gas Decay Tank being removed
* 2-GR-7A, "A DECAY TANK INLET" Standard:
* Examinee locates the "WASTE GAS DECAY            Y~NO            so uo from service, CLOSE the following valves:         TANK INLET VALVE, 2-GR-6.lA handswitch and states he/she would rotate it to
* Examinee locates the "WASTE GAS DECAY TANK INLET VAL VE, 2-GR-6.lA handswitch and states he/she would rotate it to the CLOSE position.
* 2-GR-6.lA, "DECAY TK (T-19A) the CLOSE position.
* Examinee locates the "A" Decay Tank Inlet Stop, 2-GR-6A and states he/she would rotate it in the clockwise direction until the handwheel stops.
INLET VALVE"(C-61)
* Examinee locates the "A" Decay Tank Inlet, 2-GR-7 A, and states he/she would rotate it in the clockwise direction until the handwheel stops. 2/0 Critical:
* 2-GR-6A, "A DECAY TANK INLET
Grade so uo so uo so uo
* Examinee locates the "A" Decay Tank Inlet         YON~            so uo Stop, 2-GR-6A and states he/she would rotate STOP" (-25'6" Auxiliary Building) it in the clockwise direction until the
* 2-GR-7A, "A DECAY TANK INLET"                  handwheel stops.
* Examinee locates the "A" Decay Tank Inlet, 2-     Y~NO            so uo GR-7A, and states he/she would rotate it in the clockwise direction until the handwheel stops.
Cue:
* When the examinee states that he/she is rotating the handswitch for 2-GR-6.lA to the closed position, inform examinee that the red light is NOT lit and the green light is lit.
* When the examinee states that he/she is rotating the handswitch for 2-GR-6.lA to the closed position, inform examinee that the red light is NOT lit and the green light is lit.
* When the examinee states that he/she is rotating the handle for 2-GR-6A and 2-GR-7 A, then inform him/her that the valve position indicator is pointing to the CLOSE position.
* When the examinee states that he/she is rotating the handle for 2-GR-6A and 2-GR-7A, then inform him/her that the valve position indicator is pointing to the CLOSE position.
Comments:
Comments:
* All of the manual valve handles rotate 90&deg; and have a pointer for valve position.
* All of the manual valve handles rotate 90&deg; and have a pointer for valve position.
* The handles for each of the manual valves may be oriented differently depending on local interference.
* The handles for each of the manual valves may be oriented differently depending on local interference.
* 2-GR-7A mark number matches, but noun name does not match on permanent label. A temporary label (pink tag) is in place for a 100% match while the new permanent label is being made. 9 PERFORMANCE INFORMATION JPM Number: JPM-P3 (JPM-225)
* 2-GR-7A mark number matches, but noun name does not match on permanent label. A temporary label (pink tag) is in place for a 100% match while the new permanent label is being made.
Revision:
9
2/0 Task Title: Shift from "A" to "B" Waste Gas Decay Tank STEP Perfonnance:
 
Standard:
PERFORMANCE INFORMATION JPM Number:     JPM-P3 (JPM-225)                                           Revision:   2/0 Task
Critical:
 
Grade #9 4.2. 7 WRITE time decay tank isolated.
==Title:==
Examinee writes in the time decay tank isolated.
Shift from "A" to "B" Waste Gas Decay Tank STEP Perfonnance:                                 Standard:                                         Critical: Grade
YD N[8J so uo Cue: Comments:
#9 4.2. 7 WRITE time decay tank isolated.       Examinee writes in the time decay tank isolated. YD   N[8J so uo Cue:
10 STEP #10 PERFORMANCE INFORMATION JPM Number: JPM-P3 (JPM-225)
Comments:
Revision:
10
Task Title: Shift from "A" to "B" Waste Gas Decay Tank Perfo1mance:
 
4.2.8 PLACE applicable Waste Gas Decay Tank in service as follows: a. ENSURE the following valves closed:
PERFORMANCE INFORMATION JPM Number:         JPM-P3 (JPM-225)                                                       Revision:         2/0 Task
* 2-GR-8a, "a DECAY TANK OUTLET ISOLATION" (-25'6" Auxiliary Building)
 
* 2-GR-9a, "a DECAY TANK OUTLET STOP" (-25'6" Auxiliary Building)
==Title:==
* 2-GR-8.lI!, "DECAY TK (T-19R) OUTLET VALVE" (C-61) b. OPEN the following valves:
Shift from "A" to "B" Waste Gas Decay Tank STEP Perfo1mance:                                         Standard:                                                    Critical:    Grade
* 2-GR-6.lI!, "DECAY TK (T-19R) INLET VAL VE" (C-61)
#10 4.2.8 PLACE applicable Waste Gas Decay Tank in service as follows:
* 2-GR-6!1 "a DECAY TANK INLET STOP" -25'6" Auxiliary Building)
* Examinee locates and states he/she would                YD N[2J    so uo attempt to rotate the "B" Decay tank outlet
* 2-GR-7a, "a DECAY TANK INLET" Standard:
: a. ENSURE the following valves closed:             isolation, 2-GR-8B, in the clockwise (close) direction and determines that the handle will
* Examinee locates and states he/she would attempt to rotate the "B" Decay tank outlet isolation, 2-GR-8B, in the clockwise (close) direction and determines that the handle will NOT move.
* 2-GR-8a, "a DECAY TANK                         NOT move.
* Examinee locates and states he/she would attempt to rotate the "B" Decay tank outlet stop, 2-GR-9B, in the clockwise (close) direction and determines that the handle will NOT move.
OUTLET ISOLATION" (-25'6" Auxiliary Building)
* Examinee locates and observes that the associated red light for the "B" DECAY TANK OUTLET CONTROL VAL VE, 2-GR-8. IB is out and the green light is lit.
* Examinee locates and states he/she would                 YD N[2J    so uo attempt to rotate the "B" Decay tank outlet
* Examinee locates and states he/she would place the "B" Decay tank inlet valve, 2-GR-6.IB, handswitch to the OPEN position.
* 2-GR-9a, "a DECAY TANK                        stop, 2-GR-9B, in the clockwise (close)
* Examinee locates and states he/she would rotate the "B" Decay Tank Inlet Stop, 2-GR-6B, in the counter clockwise (open) direction until the handle stops.
OUTLET STOP" (-25'6" Auxiliary                direction and determines that the handle will Building)                                      NOT move.
* Examinee locates and states he/she would rotate the "B" Decay Tank Inlet valve, 2-GR-7B, in the counter clockwise (open) direction until the handle stops. 2/0 Critical:
* Examinee locates and observes that the                   YD N[2J    so uo
Grade YD N[2J so uo YD N[2J so uo YD N[2J so uo Y[2J ND so uo Y[2J ND so uo Y[2J ND so uo Cue: For each of the above listed valves, when the examinee states that he/she is rotating a handswitch or a valve handle, then inform him/her that the valves are in the appropriate position or that the appropriate lights are lit as stated in the Standard.
* 2-GR-8.lI!, "DECAY TK (T-19R)                  associated red light for the "B" DECAY OUTLET VALVE" (C-61)                          TANK OUTLET CONTROL VALVE, 2-GR-
: b. OPEN the following valves:                      8. IB is out and the green light is lit.
* 2-GR-6.lI!, "DECAY TK (T-19R)
* Examinee locates and states he/she would                 Y[2J ND    so uo place the "B" Decay tank inlet valve, 2-GR-INLET VALVE" (C-61)                            6.IB, handswitch to the OPEN position.
* 2-GR-6!1 "a DECAY TANK INLET
* Examinee locates and states he/she would                 Y[2J ND    so uo STOP" -25'6" Auxiliary Building)              rotate the "B" Decay Tank Inlet Stop, 2-GR-6B, in the counter clockwise (open) direction
* 2-GR-7a, "a DECAY TANK INLET"                  until the handle stops.
* Examinee locates and states he/she would                 Y[2J ND    so uo rotate the "B" Decay Tank Inlet valve, 2-GR-7B, in the counter clockwise (open) direction until the handle stops.
Cue: For each of the above listed valves, when the examinee states that he/she is rotating a handswitch or a valve handle, then inform him/her that the valves are in the appropriate position or that the appropriate lights are lit as stated in the Standard.
Comments: 2-GR-7B mark number matches, but noun name does not match on permanent label. A temporary label (pink tag) is in place for a 100% match while the new permanent label is being made.
11
 
PERFORMANCE INFORMATION JPM Number:        JPM-P3 (JPM-225)                                                    Revision:    2/0 Task
 
==Title:==
Shift from "A" to "B" Waste Gas Decay Tank STEP Performance:                                        Standard:                                            Critical:  Grade
#11 4.2.9 PLACE Waste Gas Compressor switches to        Examinee places the handswitches for the "A" and    YON~      so uo position marked in step 4.2.3.                "B" Waste Gas Compressors on Panel C-61 back to the position recorded in step 4.2.3.
Cue: Inform examinee that the appropriate lights are lit.
Comments:
Comments:
2-GR-7B mark number matches, but noun name does not match on permanent label. A temporary label (pink tag) is in place for a 100% match while the new permanent label is being made. 11 PERFORMANCE INFORMATION JPM Number: JPM-P3 (JPM-225)
Revision:
2/0 Task Title: Shift from "A" to "B" Waste Gas Decay Tank STEP Performance:
Standard:
Critical:
Grade #11 4.2.9 PLACE Waste Gas Compressor switches to Examinee places the handswitches for the "A" and so uo position marked in step 4.2.3. "B" Waste Gas Compressors on Panel C-61 back to the position recorded in step 4.2.3. Cue: Inform examinee that the appropriate lights are lit. Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
TERMINATION CUE: The evaluation for this JPM is concluded.
STOP TIME: __ _ 12 VERIFICATION OF JPM COMPLETION JPMNumber:
STOP TIME: _ __
JPM-P3 (JPM-225)
12
Revision:
 
2/0 Date Performed:
VERIFICATION OF JPM COMPLETION JPMNumber:                         JPM-P3 (JPM-225)                                   Revision:         2/0 Date Performed:
Student: For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
Student:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. EVALUATION SECTION: Time Critical Task? D Yes Validated Time (minutes):
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
I 25 Actual Time to Complete (minutes):
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
I Work Practice Performance:
EVALUATION SECTION:
D SAT D UNSAT Operator Fundamentals:
Time Critical Task?                                 D   Yes ~No Validated Time (minutes):
D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question # 1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:
I     25         Actual Time to Complete (minutes):
I Work Practice Performance:                         D   SAT             D   UNSAT Operator Fundamentals:                             D   SAT             D   UNSAT JPM Question Portion Overall [NLO only]:           D   SAT             D   UNSAT               D   N/A Attached Question # 1       D   SAT             D   UNSAT Attached Question #2       D   SAT             D   UNSAT Overall Result of JPM:                             D   SAT             D   UNSAT Evaluator:
Print I Sign Areas for Improvement I Comments:
Print I Sign Areas for Improvement I Comments:
13 JPMNumber:
13
Initial Conditions:
 
Initiating Cues: STUDENT HANDOUT P3 (JPM-225)
STUDENT HANDOUT JPMNumber:                P3 (JPM-225)                           Revision:       2/0 Initial Conditions:
Revision:
2/0
* The "A" Waste Gas Decay Tank is in service.
* The "A" Waste Gas Decay Tank is in service.
* The "A" Waste Gas Decay Tank pressure indicates 137 psig.
* The "A" Waste Gas Decay Tank pressure indicates 137 psig.
Line 2,497: Line 3,223:
* All prerequisites are met.
* All prerequisites are met.
* The Task Preview and Pre-job Brief have been completed.
* The Task Preview and Pre-job Brief have been completed.
The US has directed you to remove the "A" Waste Gas Decay Tank from service and place the "B" Waste Gas Decay Tank in service. 14 JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: Local Manual Operation of a FRV JPMNumber:
Initiating Cues:    The US has directed you to remove the "A" Waste Gas Decay Tank from service and place the "B" Waste Gas Decay Tank in service.
JPM-P4 Revision:
14
0/0 Initiated:
 
John W. Riley (Signature on File) 1/30/2017 Developer Date Reviewed:
JOB PERFORMANCE MEASURE APPROVAL SHEET JPM
Will Chesnutt (Signature on File) 1/3112017 Technical Reviewer Date Approved:
 
Michael John Cote (Signature on File) 2/2/2017 Supervisor, Nuclear Training Date 1
==Title:==
Local Manual Operation of a FRV JPMNumber:     JPM-P4                           Revision:       0/0 Initiated:
John W. Riley (Signature on File)           1/30/2017 Developer                           Date Reviewed:
Will Chesnutt (Signature on File)           1/3112017 Technical Reviewer                       Date Approved:
Michael John Cote (Signature on File)         2/2/2017 Supervisor, Nuclear Training                 Date 1


==SUMMARY==
==SUMMARY==
OF CHANGES DATE DESCRIPTION REV/CHANGE 01125/2017 rlc Created from JPM-063 for 2017 NRC Re-Take Exam 010 2 JPM WORKSHEET Facility:
OF CHANGES DATE                             DESCRIPTION             REV/CHANGE 01125/2017 rlc Created from JPM-063 for 2017 NRC Re-Take Exam     010 2
MP2 Examinee:
 
JPMNumber:
JPM WORKSHEET Facility:     MP2                           Examinee:
JPM-P4 Revision:
JPMNumber:                       JPM-P4                               Revision:     0/0 Task
0/0 Task Title: Local Manual Operation of a FRV System: Main Feedwater (Steam Generator)
 
Time Critical Task: D YES 1:8:1 NO Validated Time (minutes):  
==Title:==
------15 Task Number(s):
Local Manual Operation of a FRV System:             Main Feedwater (Steam Generator)
059-01-038 Applicable To: STA ----RO ---PEO ---SRO ---x x KIA Number: 035/A4.0l KIA Rating: 3.713.6 --------Method of Testing: Simulated Performance:
Time Critical Task:                   D YES     1:8:1 NO Validated Time (minutes):
x Actual Performance:
Task Number(s):                         059-01-038 Applicable To:               SRO
Location:
                                      -- x-        STA
Classroom:
                                                          ----               RO
Simulator:
                                                                                -- x-         PEO KIA Number:               035/A4.0l             KIA Rating:           3.713.6 Method of Testing:         Simulated Performance:             x                     Actual Performance:
In-Plant:
Location:                   Classroom:                           Simulator:                         In-Plant:     x Task Standards:                 Examinee has simulated taking local manual control of the # 1 Feedwater Regulating Valve per OP 2385.
Task Standards:
Required Materials:             AOP 2504C Loss of 120 VAC Vital Instrument Panel VA-10 (procedures, equipment, etc.)   OP 2385 "Feedwater Control system Operation" General  
Examinee has simulated taking local manual control of the # 1 Feedwater Regulating Valve per OP 2385. Required Materials:
AOP 2504C Loss of 120 VAC Vital Instrument Panel VA-10 (procedures, equipment, etc.) OP 2385 "Feedwater Control system Operation" General  


==References:==
==References:==
AOP 2504C Loss of 120 VAC Vital Instrument Panel VA-10 OP 2385 "Feedwater Control system Operation"
                                        *** READ TO THE EXAMINEE ***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
3


AOP 2504C Loss of 120 VAC Vital Instrument Panel VA-10 OP 2385 "Feedwater Control system Operation" *** READ TO THE EXAMINEE *** x I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied.
JPM WORKSHEET JPMNumber:                   JPM-P4                         Revision:       0/0 Initial Conditions:
With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
3 JPM WORKSHEET JPMNumber:
JPM-P4 Revision:
0/0 Initial Conditions:
Initiating Cues: Simulator Requirements:
* The plant is at 100 % power, steady state.
* The plant is at 100 % power, steady state.
* V A-10 has de-energized due to a failure of the panel's main breaker.
* V A-10 has de-energized due to a failure of the panel's main breaker.
* Electrical Maintenance is investigating the breaker failure.
* Electrical Maintenance is investigating the breaker failure.
Initiating Cues:
* The US has directed you to establish communications with the control room and take local manual control of the #1 FRV in accordance with OP 2385 "Feedwater Control System Operation".
* The US has directed you to establish communications with the control room and take local manual control of the #1 FRV in accordance with OP 2385 "Feedwater Control System Operation".
* Simulate that you have an ASCOM phone and Headset with you.
* Simulate that you have an ASCOM phone and Headset with you.
* TSAS 3.7.1.6 "Main Feedwater Isolation Components" has been entered.
* TSAS 3.7.1.6 "Main Feedwater Isolation Components" has been entered.
* All of OP 2385 prerequisites are met except for Vital Instrument power from VAlO.
* All of OP 2385 prerequisites are met except for Vital Instrument power from VAlO.
* Step 4.7.2 has been completed by the control room. The controllers are properly configured. "REG VLV, LIC-5268" and "MSTR, LIC-5272" controllers are in manual and "BYPASS, LIC-5215" is in "AUTO". ****NOTES TO TASK PERFORMANCE EVALUATOR****
* Step 4.7.2 has been completed by the control room. The controllers are properly configured. "REG VLV, LIC-5268" and "MSTR, LIC-5272" controllers are in manual and "BYPASS, LIC-5215" is in "AUTO".
Simulator Requirements:
                  ****NOTES TO TASK PERFORMANCE EVALUATOR****
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). 4 PERFORMANCE INFORMATION JPMNumber:
: 3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
JPM-P4 Revision:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
0/0 Task Title: Local Manual Operation of a FRV STARTTIME: STEP Performance:
4
Standard:
 
Critical:
PERFORMANCE INFORMATION JPMNumber:         JPM-P4                                                         Revision:       0/0 Task
Grade #1 OP 2385 2 "Feedwater Control System Examinee reads and acknowledges the CAUTION.
 
so uo 0Qeration" 4.7 Local Operation of No. 1 FRV CAUTION 1. To remain within the Main Steam Line Break inside Containment analysis, operation with FRY bypass valve(s) open when greater than 25% power is not allowed. 2. During this mode of operation, the FRY override from "TURBINE TRIP" or "HI-HI SG LEVEL" signal does not function.
==Title:==
Cue: Provide a copy of OP 2385, "Feedwater Control System Operation";
Local Manual Operation of a FRV STARTTIME: ~~~-
index, prerequisites, and precaution (through page 7) and section 4.7, "Local Operation of No. 1 FRY". Comments:
STEP Performance:                                     Standard:                                               Critical:         Grade
STEP Performance:
#1 OP 2385 2 "Feedwater Control System             Examinee reads and acknowledges the CAUTION.           YON~            so uo 0Qeration" 4.7 Local Operation of No. 1 FRV CAUTION
Standard:
: 1. To remain within the Main Steam Line Break inside Containment analysis, operation with FRY bypass valve(s) open when greater than 25% power is not allowed.
Critical:
: 2. During this mode of operation, the FRY override from "TURBINE TRIP" or "HI-HI SG LEVEL" signal does not function.
Grade #2 NOTE Examinee reads and acknowledges the Note.
Cue: Provide a copy of OP 2385, "Feedwater Control System Operation"; index, prerequisites, and precaution (through page 7) and section 4.7, "Local Operation of No. 1 FRY".
so uo This Section is required when malfunctions occur which prevent movement of No. 1 FRY from the Control Room and operation of the Feedwater System*is required.
Comments:
Cue: Comments:
STEP Performance:                                     Standard:                                               Critical:         Grade
5 PERFORMANCE INFORMATION JPM Number: JPM-P4 Revision:
#2                       NOTE                     Examinee reads and acknowledges the Note.               YON~            so uo This Section is required when malfunctions occur which prevent movement of No. 1 FRY from the Control Room and operation of the Feedwater System*is required.
0/0 Task Title: Local Manual Operation of a FRV STEP Performance:
Cue:
Standard:
Comments:
Critical:
5
Grade #3 4.7.1 IF in MODEs 1, 2, or 3, ENTER TSAS Examinee notes that the initiating cue stated that YD N[g] so uo 3.7.1.6. TSAS 3. 7 .1.6 has been entered. Cue: Comments:
 
STEP Perfonnance:
PERFORMANCE INFORMATION JPM Number:       JPM-P4                                                         Revision:   0/0 Task
Standard:
 
Critical:
==Title:==
Grade #4 4.7.2 ENSURE the following (C-05): Examinee notes that the initiating cue stated that YD N[g] so uo Step 4.7.2 has been completed by the control room. * "REG VLV, LIC-5268," controller in manual (red light, lit) * "MSTR, LIC-5272," controller in manual (red light, lit) * "BYPASS, LIC-5215," controller in "AUTO" (green light, lit) Cue: Comments:
Local Manual Operation of a FRV STEP Performance:                                   Standard:                                           Critical: Grade
STEP Performance:
#3 4.7.1 IF in MODEs 1, 2, or 3, ENTER TSAS       Examinee notes that the initiating cue stated that YD   N[g] so uo 3.7.1.6.                               TSAS 3. 7 .1.6 has been entered.
Standard:
Cue:
Critical:
Comments:
Grade #5 4.7.3 STATION Operator at 2-FW-5 lA, "#1 Examinee proceeds to the FRV area and states that YD N[g] so uo S/G FEED REG VAL VE," and they would contact the control room on their ESTABLISH communications ASCOM phone. (54' 6" TB). Cue: Communications with Control room established.  
STEP Perfonnance:                                   Standard:                                           Critical: Grade
*BOP is on the line. Comments:
#4 4.7.2 ENSURE the following (C-05):             Examinee notes that the initiating cue stated that YD   N[g] so uo Step 4.7.2 has been completed by the control room.
6 PERFORMANCE INFORMATION JPMNumber:
          *   "REG VLV, LIC-5268," controller in manual (red light, lit)
JPM-P4 Revision:
          *   "MSTR, LIC-5272," controller in manual (red light, lit)
0/0 Task Title: Local Manual Operation of a FRV STEP Performance:
          *   "BYPASS, LIC-5215," controller in "AUTO" (green light, lit)
Standard:
Cue:
Critical:
Comments:
Grade #6 4.7.4 At 2-FW-51A, "#1 SIG FEED REG Examinee simulates removing the handwheel YcgjN0 so uo VAL VE," PERFORM the following anti-rotational restraint or states they would (54' 6" TB): remove the handwheel anti-rotational restraint.
STEP Performance:                                   Standard:                                           Critical: Grade
: a. REMOVE handwheel anti-rotational restraint.
#5 4.7.3 STATION Operator at 2-FW-5 lA, "#1       Examinee proceeds to the FRV area and states that YD   N[g] so uo S/G FEED REG VALVE," and               they would contact the control room on their ESTABLISH communications               ASCOM phone.
Cue: Restraining device is removed. Comments:
(54' 6" TB).
STEP Performance:
Cue: Communications with Control room established. *BOP is on the line.
Standard:
Comments:
Critical:
6
Grade #7 CAUTION Examinee reads and acknowledges the Caution Y0Ncgj so uo Feed Regulating valve may move in the closed direction when engaging the large manual hand wheel. Cue: Comments:
 
STEP Performance:
PERFORMANCE INFORMATION JPMNumber:             JPM-P4                                                         Revision: 0/0 Task
Standard:
 
Critical:
==Title:==
Grade #8 4.7.4 At 2-FW-51A, "#1 SIG FEED REG Y0N0 so uo VAL VE," PERFORM the following Examinee simulates turning the large handwheel (54 6" TB): for 2-FW-5 lA in the clockwise direction until it b. TURN large handwheel clockwise to will not turn any further or states that they would its limit of travel. turn the large handwheel for 2-FW-51A in the clockwise direction until it will not turn any further. Cue: Large handwheel for 2-FW-51A rotated clockwise to hard stop. Comments:
Local Manual Operation of a FRV STEP Performance:                                   Standard:                                             Critical: Grade
7 PERFORMANCE INFORMATION JPM Number: JPM-P4 Revision:
#6 4.7.4 At 2-FW-51A, "#1 SIG FEED REG             Examinee simulates removing the handwheel             YcgjN0     so uo VALVE," PERFORM the following           anti- rotational restraint or states they would (54' 6" TB):                             remove the handwheel anti- rotational restraint.
0/0 Task Title: Local Manual Operation of a FRV STEP Performance:
: a. REMOVE handwheel anti- rotational restraint.
Standard:
Cue: Restraining device is removed.
Critical:
Comments:
Grade #9 4.7.4 At 2-FW-51A, "#1 SIG FEED REG Examinee simulates turning the small handwheel in YC8] ND so uo VAL VE," PERFORM the following the counter-clockwise direction until it will not tum (54 6" TB): any further or states that they would tum the small c. TURN small handwheel handwheel in the counter-clockwise direction until counterclockwise until tight, locking it will not tum any further. large handwheel in "engaged" position.
STEP Performance:                                     Standard:                                             Critical: Grade
#7                       CAUTION                   Examinee reads and acknowledges the Caution           Y0Ncgj     so uo Feed Regulating valve may move in the closed direction when engaging the large manual handwheel.
Cue:
Comments:
STEP Performance:                                     Standard:                                             Critical: Grade
#8 4.7.4 At 2-FW-51A, "#1 SIG FEED REG                                                                   Y0N0       so uo VALVE," PERFORM the following           Examinee simulates turning the large handwheel (54 6" TB):                             for 2-FW-5 lA in the clockwise direction until it
: b. TURN large handwheel clockwise to     will not turn any further or states that they would its limit of travel.                 turn the large handwheel for 2-FW-51A in the clockwise direction until it will not turn any further.
Cue: Large handwheel for 2-FW-51A rotated clockwise to hard stop.
Comments:
7
 
PERFORMANCE INFORMATION JPM Number:       JPM-P4                                                             Revision:       0/0 Task
 
==Title:==
Local Manual Operation of a FRV STEP Performance:                                     Standard:                                                 Critical:       Grade
#9 4.7.4 At 2-FW-51A, "#1 SIG FEED REG VALVE," PERFORM the following Examinee simulates turning the small handwheel in       YC8] ND       so uo the counter-clockwise direction until it will not tum (54 6" TB):                               any further or states that they would tum the small
: c. TURN small handwheel                     handwheel in the counter-clockwise direction until counterclockwise until tight, locking   it will not tum any further.
large handwheel in "engaged" position.
Cue: Small handwheel turned counterclockwise and is tight (large handwheel is locked in engaged position).
Cue: Small handwheel turned counterclockwise and is tight (large handwheel is locked in engaged position).
Comments:
Comments:
STEP Performance:
STEP Performance:                                     Standard:                                                 Critical:       Grade
Standard:
#10 4.7.4 At 2-FW-51A, "#1 SIG FEED REG             Examinee locates 2-FW-39A and simulates turning         YC8] ND         so uo VALVE," PERFORM the following           its knob counterclockwise until it will not tum any (54 6" TB):                             further or states that they would open it by turning
Critical:
: d. OPEN 2-FW-39A, "'A' FEED                 its knob counterclockwise until it will not tum any REGULATING EQUALIZING STOP."           further.
Grade #10 4.7.4 At 2-FW-51A, "#1 SIG FEED REG Examinee locates 2-FW-39A and simulates turning YC8] ND so uo VAL VE," PERFORM the following its knob counterclockwise until it will not tum any (54 6" TB): further or states that they would open it by turning d. OPEN 2-FW-39A, "'A' FEED its knob counterclockwise until it will not tum any REGULATING EQUALIZING STOP." further. Cue: FW-39A, FEED REGULATING EQUALIZING STOP, is open. Comments:
Cue: FW-39A, FEED REGULATING EQUALIZING STOP, is open.
STEP Performance:
Comments:
Standard:
STEP Performance:                                     Standard:                                                 Critical:       Grade
Critical:
#11 4.7.5 As directed by Control Room,               Examinee informs the control room 2-FW-51A is           YD NC8]         so uo OPERATE No. 1 FRY large handwheel in Local-Manual control, standing by for direction.
Grade #11 4.7.5 As directed by Control Room, Examinee informs the control room 2-FW-51A is YD NC8] so uo OPERA TE No. 1 FRY large handwheel in Local-Manual control, standing by for direction.
and MAINTAIN No. 1 SG level within desired operating band.
and MAINTAIN No. 1 SG level within desired operating band. Cue: As BOP, acknowledge that #1 FRY is in local manual and instruct examinee to standby for instructions.
Cue: As BOP, acknowledge that #1 FRY is in local manual and instruct examinee to standby for instructions. This completes the JPM.
This completes the JPM. Comments:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
TERMINATION CUE: The evaluation for this JPM is concluded.
STOP TIME: ---8 VERIFICATION OF JPM COMPLETION JPMNumber:
STOP TIME: - - -
JPM-P4 Revision:
8
0/0 Date Performed:
 
Student: For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
VERIFICATION OF JPM COMPLETION JPMNumber:                             JPM-P4                                       Revision:         0/0 Date Performed:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. EVALUATION SECTION: Time Critical Task? D Yes [gj No Validated Time (minutes):
Student:
I 15 Actual Time to Complete (minutes):
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
I Work Practice Performance:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
D SAT D UNSAT Operator Fundamentals:
EVALUATION SECTION:
D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question # 1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:
Time Critical Task?                                 D   Yes [gj No Validated Time (minutes):               15         Actual Time to Complete (minutes):
I                                                                  I Work Practice Performance:                         D   SAT             D   UNSAT Operator Fundamentals:                             D   SAT             D   UNSAT JPM Question Portion Overall [NLO only]:           D   SAT             D   UNSAT               D   N/A Attached Question # 1       D   SAT             D   UNSAT Attached Question #2       D   SAT             D   UNSAT Overall Result of JPM:                             D   SAT             D   UNSAT Evaluator:
Print I Sign Areas for Improvement I Comments:
Print I Sign Areas for Improvement I Comments:
9 JPMNumber:
9
Initial Conditions:
 
Initiating Cues: STUDENT HANDOUT JPM-P4 Revision:
STUDENT HANDOUT JPMNumber:                  JPM-P4                                 Revision:         0/0 Initial Conditions:
0/0
* The plant is at 100 % power, steady state.
* The plant is at 100 % power, steady state.
* V A-10 has de-energized due to a failure of the panel's main breaker.
* V A-10 has de-energized due to a failure of the panel's main breaker.
* Electrical Maintenance is investigating the breaker failure.
* Electrical Maintenance is investigating the breaker failure.
Initiating Cues:
* The US has directed you to establish communications with the control room and take local manual control of the #1 FRV in accordance with OP 2385 "Feedwater Control System Operation".
* The US has directed you to establish communications with the control room and take local manual control of the #1 FRV in accordance with OP 2385 "Feedwater Control System Operation".
* Simulate that you have an ASCOM phone and Headset with you.
* Simulate that you have an ASCOM phone and Headset with you.
* TSAS 3.7.1.6 "Main Feedwater Isolation Components" has been entered.
* TSAS 3.7.1.6 "Main Feedwater Isolation Components" has been entered.
* All of OP 23 85 prerequisites are met except for Vital Instrument power from VAlO.
* All of OP 23 85 prerequisites are met except for Vital Instrument power from VAlO.
* Step 4.7.2 has been completed by the control room. The controllers are properly configured. "REG VLV, LIC-5268" and "MSTR, LIC-5272" controllers are in manual and "BYPASS, LIC-5215" is in "AUTO". 10}}
* Step 4.7.2 has been completed by the control room. The controllers are properly configured. "REG VLV, LIC-5268" and "MSTR, LIC-5272" controllers are in manual and "BYPASS, LIC-5215" is in "AUTO".
10}}

Latest revision as of 18:21, 4 February 2020

Draft Operating Exam (Section a and Section B) (Folder 2)
ML17087A090
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/06/2017
From:
Dominion Nuclear Connecticut
To: David Silk
Operations Branch I
Shared Package
ML16337A097 List:
References
U01968
Download: ML17087A090 (212)


Text

JOB PERFORMANCE MEASURE APPROVAL SHEET JPM

Title:

Maximum RCS Venting Time Determination JPMNumber: JPM-AlR (JPM-146) Revision: 1 Initiated:

John W. Riley (Signature on File) 1/23117 Developer Date Reviewed:

Will Chesnutt (Signature on File) 1/27117 Technical Reviewer Date Approved:

Michael John Cote (Signature on File) 1/24/17 Supervisor, Nuclear Training Date 1

SUMMARY

OF CHANGES DATE DESCRIPTION REV/CHANGE 1/9117 JPM 146 developed in 2001. Revised to latest JPM format. 1 Changed number for 201 7 NRC JPM exam. Changed initial condition to give a different vent time. Other editorial changes.

2

JPM WORKSHEET Facility: MP2 Bxaminee:

JPMNumber: JPM-AlR (JPM-146) Revision: 1 Task

Title:

Maximum RCS Venting Time Determination System: RCS Time Critical Task: DYES ~NO Validated Time (minutes): 10 Task Number(s): NUTIMS #000-05-222 Applicable To: SRO STA


RO

-- x- PBO KIA Number: 2.1.23 KIA Rating: 4.314.4 Method of Testing: Simulated Performance: Actual Performance: x Location: Classroom: x Simulator: In-Plant:

Task Standards: At the completion of this JPM, the examinee will have determined the maximum allowable venting time (7 minutes+/- 2 minutes). under the stated plant conditions Required Materials: BOP 2541, Appendix 24 (procedures, equipment, etc.)

General

References:

BOP 2541

      • READ TO THE EXAMINEE ***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

3

JPM WORKSHEET JPMNumber: JPM-AlR (JPM-146) Revision: 1 Initial Conditions:

  • The plant tripped from 100% due to a LOCA.
  • EOP 2532 is being performed.
  • Appendix 24, "Void Elimination" is being implemented.
  • Appendix 24, "Void Elimination, step 4, has been attempted to eliminate the voiding, by raising and lowering the RCS pressure within the RCS PIT curve.
  • Attempts to eliminate the void were not successful AND a non-condensable void is suspected.
  • RCS pressure is 760 psia.
  • RCS temperature is 342°F.
  • Containment temperature is 185°F.
  • Containment pressure is 2.2 psig.
  • Containment hydrogen concentration is currently 2.0%.
  • Containment fans are running.

Initiating Cues: The Unit Supervisor has directed you to determine the maximum allowable RCS venting time in accordance with EOP 2541, Appendix 24, "Void Elimination", Contingency Action Step 4.1.a.

Simulator Requirements: NIA

        • NOTES TO TASK PERFORMANCE EVALUATOR****
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

4

PERFORMANCE INFORMATION JPM Number: JPM-AlR (JPM-146) Revision: 1 Task

Title:

Maximum RCS Venting Time Determination START TIME: - - - -

S TE P I Performance: Standard: Critical: Grade

  1. 1 4.1 IF attempts to eliminate the void were Examinee refers to Attachment 24-A YON~ so uo not successful AND a non-condensable void is suspected, PERFORM the following to vent the reactor vessel:
a. DETERMINE maximum allowable venting time. Refer to Attachment 24-A, "RCS Vent Time Based on Hydrogen Buildup Inside Containment."

Cue: Provide a copy ofEOP 2541, Appendix 24. The title on Attachment 24-A does not match the procedure step. The step has "RCS Vent Time Based on Hydrogen Buildup Inside Containment" and Attachment 24-A has "RCS Vent Time Based on Hydrogen Buildup".

If asked state as a the US state that Attachment 24-A "RCS Vent Time Based on Hydrogen Buildup" should be used and that you will make an entry in the Narrative Log on the discrepancy.

Comments:

5

PERFORMANCE INFORMATION JPMNumber: JPM-AlR {J!1M-_146) Revision: 1 Task

Title:

Maximum RCS Venting Time Determination STEP Performance: Standard: Critical: Grade

  1. 2 This figure is valid only when the following conditions exist:

Examinee compares initial conditions against the YD N!Z;J so uo requirements on Attachment 24-A and identifies

1. RCS temperature is greater than 212 °F. that the figure is valid for the current conditions.
2. RCS pressure is less than 2250 psia.
3. Containment Temperature is less than 225 °F.
4. Containment pressure is greater than 0.0 psig.
5. Containment Hydrogen concentration is less than 2.9%.
6. Containment fans are running.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 3 Determine maximum vent time. Examine using the initial conditions of RCS Ycgj ND so uo pressure (760 psia) and current containment Hydrogen volume (2.0%) to determine maximum vent time.

Examinee determines the maximum allowable vent time is 7 minutes(+/- 2 minutes).

Cue: Once the examinee has determined the maximum vent time state this JPM is complete.

Comments:

TERMINATION CUE: The evaluation for this JPM is concluded.

STOP TIME: - - -

6

VERIFICATION OF JPM COMPLETION JPMNumber: JPM-AlR (JPM-146) Revision: 1 Date Performed:

Student:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

EVALUATION SECTION:

Time Critical Task? D Yes fZI No Validated Time (minutes): 10 Actual Time to Complete (minutes):

I I Work Practice Performance: D SAT D UNSAT Operator Fundamentals: D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question #1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:

Print I Sign Areas for hnprovement I Comments:

7

STUDENT HANDOUT JPMNumber: JPM-AlR (JPM-146) Revision: 1 Initial Conditions:

  • The plant tripped from 100% due to a LOCA.
  • BOP 2532 is being performed.
  • Appendix 24, "Void Elimination" is being implemented.
  • Appendix 24, "Void Elimination, step 4, has been attempted to eliminate the voiding, by raising and lowering the RCS pressure within the RCS PIT curve.
  • Attempts to eliminate the void were not successful AND a non-condensable void is suspected.
  • RCS pressure is 760 psia.
  • RCS temperature is 342°F.
  • Containment temperature is 185°F.
  • Containment pressure is 2.2 psig.
  • Containment hydrogen concentration is currently 2.0%.
  • Containment fans are running.

Initiating Cues: The Unit Supervisor has directed you to determine the maximum allowable RCS venting time in accordance with BOP 2541, Appendix 24, "Void Elimination, Contingency Action Step 4.1.a.

8

JOB PERFORMANCE MEASURE APPROVAL SHEET JPM

Title:

Evaluate RCP Seal Problem (Admin)

JPM Number: JPM-Al.1 Revision: 010 Initiated:

Robert L. Cimmino, Jr. 0113112017 Developer Date Reviewed:

Will Chesnutt Technical Reviewer Date Approved:

Michael John Cote Supervisor, Nuclear Training Date

SUMMARY

OF CHANGES DATE DESCRIPTION REV/CHANGE Updated to reflect changes to OP 2301 C and new 1500 psid 0612712003 8 criteria.

05/03/2016 rlc Updated to reflect new format and procedure chanaes. 9 O1/26/201 7 rlc Concept copied from JPM-011for2017 NRG Re-Take Exam 010 2

JPM WORKSHEET Facility: MP2 Examinee:

JPM Number: JPM-Al.l Revision: 0/0 Task

Title:

Evaluate RCP Seal Problem (Admin)

System: RCP Time Critical Task: D YES cg] NO Validated Time (minutes): 20 Task Number(s): NUTIMS #003-01-033 Applicable To: SRO STA RO x PEO KIA Number: 003/A2.01 KIA Rating: 3.5/3.9 KIA Number: 2.1.7 KIA Rating:

- - -4.4/4.7 Method of Testing: Simulated Performance: Actual Performance: x Location: Classroom: x Simulator: In-Plant:

Task Standards: At the completion of this JPM, examinee has evaluated "A" RCP indications and reported that one seal has failed and another seal is failed/degraded. The examinee also recommends, based on the above findings, that a controlled shutdown should be initiated.

Required Materials: AOP 2586, RCP Malfunctions (procedures, equipment, etc.) Calculator General

References:

AOP 2586, RCP Malfunctions

      • READ TO THE EXAMINEE ***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

3

JPM WORKSHEET JPMNumber: JPM-Al.1 Revision: 0/0 Initial Conditions:

  • Several alarms have annunciated for the "A" RCP.
  • C-02/3; BA-18, RCP A MID SEAL PRES HI, remains locked in.
  • The PPC has failed and is unusable.
  • The US has entered AOP 2586, RCP Malfunctions, and has proceeded to step *2a. Trend RCP Data, CHECK PPC available.
  • Another operator has just recorded the initial set of data for the "A" RCP on AOP 2586, Attachment A, A RCP Seal Data.

Initiating Cues:

  • You are the RO.
  • The US has directed you to perform AOP 2586, RCP Malfunctions, starting with Step *2a. Trend RCP Data, to evaluate the operation of the "A" RCP, using the initial set of data that was recorded.
  • Report any indications of failed seals and make recommendations concerning continued operation.
  • RCP vibration data will be acquired and trended by another operator.
  • Only the initial set of data needs to be evaluated at this time. Subsequent trending of RCP data will be performed by other operators.

Simulator Requirements: None

        • NOTES TO TASK PERFORMANCE EVALUATOR****
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

4

PERFORMANCE INFORMATION JPM Number: JPM-Al.l

_::.__~~~~~~~~~~~~---~~~

Revision: 0/0 Task

Title:

Evaluate RCP Seal Problem (Admin)

START TIME: _ _ __

STEP Performance: Standard: Critical: Grade

  1. 1 AOP 2586 2 "RCP Malfunctions" YO N[gj so uo ACTION/EXPECTED RESPONSE Examinee refers to AOP 2586, Step 2 and notes the
2. Trend RCP Data PPC is not available per the initiating conditions.
a. CHECK PPC available Examinee then refers to RNO Step 2a. l . and uses RESPONSE NOT OBTAINED the given copy of Attachment "A", with the
a. PERFORM the following: provided initial data, to determine the status of the I. Using appropriate ATTACHMENT A "A" RCP seals.

through ATTACHMENT D, RECORD the affected RCP data parameters at an interval determined by SM/US AND REFER to ATTACHMENT E.

Cue:

Comments: The form is effectively a job aid in determining the status of RCP seals when the PPC is unavailable.

STEP Performance: Standard: Critical: Grade

  1. 2 AOP 25862 "RCP Malfunctions" Examinee fills out Attachment A in accordance YO N[gj so uo ATTACHMENT A 2 "A RCP Seal Data" with the attached key.

Based on the calculations performed on Attachment A:

I. One seal Lip < 200 psid.

2. Second seal Lip > 1500 psid.

Cue:

Comments:

5

PERFORMANCE INFORMATION JPM Number: JPM-Al.1

~~~~~~~~~~~~~~~~~~~

Revision: 0/0 Task

Title:

Evaluate RCP Seal Problem (Admin)

STEP Performance: Standard: Critical: Grade

  1. 3 AOP 25862 "RCP Malfunctions" Examinee refers to AOP 2586, Attachment E, Y~NO so uo ATTACHMENT E 2 "RCP Seal Failure "RCP Seal Failure Indication Significance", and Indication Significance" notes the following:

Indication

  • One seal failed (due to the ~p < 200 psid) .

RCP Lower, Mid, Upper seal DIP high/low

  • Second seal degraded/failing (due to seal
  • Any seal greater than 1500 psid RCP ~p >1500 psid).
  • DIP is less than or equal to 200 psid Possible Causes:

Single RCP Seal Failure Cue:

Comments: Identifying which seal is failed or failing and why is not critical.

STEP 3. Check RCP For Plant Shutdown Required Standard: Critical: Grade

  1. 4 a. CHECK affected RCP for the Examinee continues with step 3 and notes the YON~ so uo following: following:
  • Any RCP seal stage DIP is
  • One seal has > 1500 psid GREATER THAN 1500 psid AND OR
  • One seal has < 650 psid .
  • RCP has one RCP seal stage failed and another seal stage LESS THAN 650 psid Cue:

Comments:

6

PERFORMANCE INFORMATION JPM Number: JPM-Al.1

......=:~~~~~~~~~~~~~~~~~~

Revision: 0/0 Task

Title:

Evaluate RCP Seal Problem (Admin)

STEP Performance: Standard: Critical: Grade

  1. 5 b. PERFORM the following: Examinee continues with step 3b. and recommends Y[8J ND so uo I. GO TO OP 2204, Load Changes a plant shutdown be performed.

AND INITIATE a plant shutdown AND CONTINUE with actions of this procedure beginning with step 3 .c Cue: The only critical action is to recommend a plant shutdown.

Comments:

Recommending a course of action for the plant completes the JPM.

TERMINATION CUE: The evaluation for this JPM is concluded.

STOP TIME: _ __

7

VERIFICATION OF JPM COMPLETION JPMNumber: JPM-Al.1 Revision: 0/0 Date Performed:

Student:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

EVALUATION SECTION:

Time Critical Task? D Yes 12] No Validated Time (minutes): 20 Actual Time to Complete (minutes):

I I Work Practice Performance: D SAT D UNSAT Operator Fundamentals: D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT 12] NIA Attached Question #1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:

Print I Sign Areas for Improvement I Comments:

8

STUDENT HANDOUT JPMNumber: JPM-Al.1 Revision: 0/0 Initial Conditions:

  • Several alarms have annunciated for the "A" RCP.
  • C-02/3; BA-18, RCP A MID SEAL PRES HI, remains locked in.
  • The PPC has failed and is unusable.
  • The US has entered AOP 2586, RCP Malfunctions, and has proceeded to step *2a. Trend RCP Data, CHECK PPC available.
  • Another operator has just recorded the initial set of data for the "A" RCP on AOP 2586, Attachment A, A RCP Seal Data.

Initiating Cues:

  • You are the RO.
  • The US has directed you to perform AOP 2586, RCP Malfunctions, starting with Step *2a. Trend RCP Data, to evaluate the operation of the "A" RCP, using the initial set of data that was recorded.
  • Report any indications of failed seals and make recommendations concerning continued operation.
  • RCP vibration data will be acquired and trended by another operator.
  • Only the initial set of data needs to be evaluated at this time. Subsequent trending of RCP data will be performed by other operators.
1. Status of "A" RCP Seals:
2. Recommended action:

9

[EXamillee- Handout I DOMINION AOP 2586 Millstone Power Station Revision 002 RCP Malfunctions Page 12 of 17 ATTACHMENT A A RCP Seal Data (Page 1 of 1)

TABLE 1 NOTE: RCP seals are four stage sealing devices. When operating properly, the first three seal stages reduce pressure by approximately one third (1i3) of the total pressure across the pump seaL (D -E _ _ __ NOTE: With RCS at rated pressure (2200 to 2300 psia), alarms actuate when seal stage pressures deviate from G nominal values by 150 psig. This indicates a degraded or failing operation of a particular seal stage.

(C -D =G _ _ __ NOTE: RCP seal stages are considered failed when dip across stage is less than 200 psid and RCS pressure is at H rated pressure (2200 to 2300 psia).

(B -C =H _ _ __ NOTE: The increased dip in the remaining intact seal stages is equal to the decrease in dip of the degraded or failed seal stage. For short periods of time. each seal stage is designed to safely function with full RCS pressure dip across the seal stage to allow for plant shutdown. Operation with dip less than (A -B _ _ __

1500 psid across a seal stage is acceptable indefinitely.

Data PPC Expected PPC Data I (Graphic (Time Acquired)

Parameter Point Value Alarm Location Designator) I Todav, Now I (C-04R, HS-150*1) Temperature (°F)

_1  !..lcL____(_lill! *-+-----*-*-+-------+-------+*--*-*----+

f-*

-+------+--------+--------

---+---'-_lJ . -+---- +--- -l (C-04R, HS-150*2) Pressure (psig)

Middle Seal 1625# (High) 1 (B) 1290# (Low) 2200 Upper Seal ~:=;; ~::~;-1--2---1-(c>j ___ 605 -----+---------------+---------+-------

  • --(D)i-----71~-- --+-----------+------- +---------

Vapor Seal 125# (High) 3 20# /Lowl (C..04R, HS-150-3) Level (%)

Upper Oil Reservoir L156 78 to 84% 85% (High) 70% (Low) 76 Lower Oil Reservoir *u~l-18 to 84%*-- 85% (High) 2 77% (low) 82 Additional Data (gpm I psia I psig I psid)

~_:5g:;;,,<~~~::) PR-~~~:R(#9)

Bleedoff Flow F150 0 9 to 1.3 pgm


 !-------- (K) I -1.52 -----J m-------+*--*-----+-------+- ------j f

RCS Pressure PZRPR 2240 to 2260 psia 2350# (High) C-02/3 (A) 2240 RCS (psia) - 15 =A (psig)

Coora"'"'""'

Vapor Seal d/p """"".

(F=O-El_

Upper Seal dip (G=C-0 L.J:Ai_c:J~"1..§eal dip (H=B-9._

cmoRR (2225 to 2245 psig) 1900# (Low) PR-100

--"'_iF_L_

(G)

__(_t:f)___

0 I "--r-~-~

0 1 ° +=

0

______ 1 Lower Seal dip (I=A-B) CVALWROP N/A Table 1 (1)

G'aptncsNo CSS324 ATTACHMENT A - 'A' RCP SEAL DATA CONTINUOUS USE IExaminee Handout!

!ANSWER KJfY]

DOMINION AOP 2586 Millstone Power Station Revision 002 RCP Malfunctions Page 12 of 17 ATTACHMENT A A RCP Seal Data (Page 1 of 1) d/p Too High For Continued Operation TABLE 1 \ I I NOTE: RCP seals are four stage sealing devices. When operating properly, the first three seal stages reduce pressure by approximately one third (1i3) of the total pressure across the pump seal.

70 -E 0 =F __l_ H I NOTE:

(D l I With RCS at rated pressure (2200 to 2300 psia), alarms actuate when seal stage pressures deviate from G nominal values by 150 psig. This indicates a degraded or failing operation of a particular seal stage.

(C Ml5 -D 70 =G ='--"=' INOTE: RCP seal stages are considered failed when dip across stage is less than 200 psid and RCS pressure is at H rated pressure (2200 to 2300 psia).

(B .!200 -C 605 =H l:'.'"'I=' I NOTE: The increased dip in the remaining intact seal stages is equal to the decrease in d/p of the degraded

' I or failed seal stage. For short periods of time. each seal stage is designed to safely function with (A 2240 2200 full RCS pressure dip across the seal stage to allow for plant shutdown. Operation with dip less than

-B 1500 psid across a seal stage is acceptable indefinitely.

Data PPC Expected PPC Data (Graphic (Time Acq~~~-~)__ _

Parameter Point Value Alarm Location Designator) I Today, Now 1-----------_:_::__.:.:._:_::__L__ _,__,__ __L_ _ _ _ _ __ l_ _ _ _ _ _-'--.(~C'-04,..~R',cHus'--;f;15o-1)Temperature(°F)

Lower Se~! T151 ---~-c;u.~~~ _go_:_i=__--+----"-----+----'---'- +

Lube Oil Cooler Outlet T152 100 to 120"F 120"F 2 Lube Oil Cooler Inlet _ _I.:!._~1.__ 120 to 140"F -+--~-- 1.25 Controlled Bleedoff T154 110 to 150<'F 150°F 115 Motor Stator Windin T155 1'75 Upper Gui9e Bearing T156 ISO Lower Guide Bearin T157 140 to 160"'F _____!§O"F_--+--_--.....:.._____ +--- 105

--~r Thrust Bearin

~r Thrust Bearing Anti-reverse Bearing

- - - - - - Lower Bearing Oil

---~T158

_ _I_~~

T190

-,:194--

100 to 125"F

_ 160°F 160"F 175"'F 125"F 8

9 rn

, .... I -----==P;-:,:;

- - - - - - + - I- -'>.\

11 (C-04R, HS-150-2) Pressure (psig)

Middle Seal P151 I 1400 to 1600 psig I 1625# (High) 1 (B) 1290# (Low) 2200

!------------ Upper Seal I P152 600-to 800 psig- 94-5#(High) 2 (C) 545# (Low)_

605


+-------+

VaporSeal I P153 40 to-----r---c125#

1 OU psig (High) 3 (D) 70 20#(Low (C-04R, HS-150-3) Level(%)

Upp8r Oil Reservoir L156 78 to 84% 85% (High) 76

_"7()% (L_"::'_'~- ------ -----+-- -+-~---+-- t-~------j Lower Oil Reservoir I L 157 78 to 84% 85% (High) 82 77°/c, (Low)

Additional Data (gpm I psia I psig I psid)

Bleedoff Flow F150 1.5 gpm (High)

PR-~~~:R(#9]

0.9 to 1 .3 pgm RCS Pressure PZRPR 2240 to 2260 psia 0.85 gpm (Low) 2350# (High) C-0213 1I _ (K)_ _

(A)

L_1_*5_2____,_ ------1-----------------+---- -----l-----

RCS (ps1a) - 15 ~A (psig) (2225 to 2245 psig) PR-100 2240 1900# (Low)

Containment Pressure CTMTPR 0 0 0

-yap;;rs-;,aid1p (F=D-E) -CVAVAPDP Upper Seal dip (G~C-D) CVAUPRDP -*Degraded Seal

_r-,.1iddle Seal dip (H=B-C) CVAMIDDP Lower Seal dip (I=A-B) CVALWRDP Failed Seal G'apt11csNo CS8324 CONTINUOUS USE

!ANSWER KEY I

DOMINION

!ANSWER KEYj AOP2586 Millstone Power Station Revision 002 RCP Malfunctions Page 16 of 17 ATTACHMENT E RCP Seal Failure Indication Significance (Page 1 of 1)

Indication Possible Causes:

RCP Lower, Mid, Upper seal DIP high/low

  • Any seal greater than 1500 psid Single RCP Seal Failure
  • DIP is less than or equal to 200 psid RCP Lower, Mid, Upper seal DIP rate of change I

Single RCP Seal Failure

  • 10 psidlhr RCP Bleedoff Temperature High Single RCP Seal Failure
  • Bleedoff temperature greater than 195.0 °F RCP Bleedoff Flow High Single RCP Seal Failure
  • Bleedoff Flow greater than 2.0 gpm Vapor Seal Pressure low (any of the following)
  • Increasing Containment Sump level of equal to or greater than 1 gpm
  • less than 25 psid
  • Controlled Bleedoff pressure (P215) is low and NOT able to be increased using PIC-215. Failed or Failing Vapor Seal Stage
  • Stator temperature on the affected RCP is increasing and DOES NOT stabilize.
  • Increased upward trend Containment radiation monitors.

Vapor Seal Pressure High Interruption of RCP Bleedoff Flow Path

  • greater than 115 psid d Operation with DIP less than or equal to 1500 ps1d across a seal stage is acceptable indefinitely.

-II RCP seal stages are considered failed when DIP across that stage is less than or equal to 200 psld AND RCS pressure is between 2,200 and 2,300 psia IF one seal stage fails (DIP is less than or equal to 200 psid), OR is degrading AND the following are NOT in alarm or trending toward alarm limits, THEN allow affected RCP to remain in service:

  • Controlled Bleedoff Flow
  • Controlled Bleedoff Temperature With RCS pressure at 2200 to 2300 psla, alarms are actuated when seal stage pressures deviate from nominal values by 150 psig, Indicating degraded or failing operation of a particular seal stage.

!ANSWER KEYi CONTINUOUS USE

DOMINION !ANSWER KEYi AOP2586 Millstone Power Station Revision 002 RCP Malfunctions Page 7of17 STEPll ACTION/EXPECTED RESPONSE II RESPONSE NOT OBTAINED

  • 3_ Check RCP For Plant Shutdown Required
a. CHECK affected RCP for the following: D a. PROCEED TO step 4.

D

  • Any RCP seal stage D/P is GREATER THAN 1500 psid QB D
  • RCP has one RCP seal stage failed and another seal stage LESS THAN 650 psid QB D
  • RCP upper or lower oil reservoir level trending outside of PPG alarm values on Attachment A through Attachment D.

QB D

  • Any RCP seal temperature or bearing oil temperature increasing trend and evaluation indicates alarm setpoint will be reached
b. PERFORM the following:

D 1. GO TO OP 2204, Load Changes AND INITIATE a plant shutdown AND CONTINUE with actions of this procedure beginning with step 3.c D c. WHEN Reactor is sub-critical, THEN STOP affected RCP CONTINUOUS USE

!ANSWER KEYi

JOB PERFORMANCE MEASURE APPROVAL SHEET JPM

Title:

Determine Shutdown Margin JPMNumber: JPM-A1.2R Revision: 3 Initiated:

John W. Riley (Signature on File) 01/23/2017 Developer Date Reviewed:

Will Chesnutt (Signature on File) 01/31/2017 Technical Reviewer Date Approved:

Michael John Cote (Signature on File) 01/24/2017 Supervisor, Nuclear Training Date 1

SUMMARY

OF CHANGES DATE DESCRIPTION REV/CHANGE Revised JPM for LOIT 2008 NRC Exam 1 Revised to incorporate NRC comments 2 (Note: Rev. 1 was never approved) 12/29/08 Incorporated NRC Post-Validation comments 2 01/23/17 Revised JPM for ILT 2017 JPM Retake Exam. Updated to 3 latest JPM template. This is essentially a complete re-write of JPM due to the significant changes to the procedure OP 2208 (revision 017) for determining Shutdown Margin and a completely new OP 2208-013 form (revision 009).

2

JPM WORKSHEET Facility: MP2 Examinee:

JPMNumber: JPM-A1.2R Revision: 3 Task

Title:

Determine Shutdown Margin System: Administrative Time Critical Task: D YES ~NO Validated Time (minutes): 25 Task Number(s): NUTIMS #121-01-145 Applicable To: SRO x STA x RO x PEO KIA Number: 2.1.37 KIA Rating: 4.3/4.6 Method of Testing: Simulated Performance: Actual Performance: x Location: Classroom: x Simulator: In-Plant:

Task Standards: At the completion of this JPM, the examinee has determined the required shutdown boron concentration is between 833.8 ppm to 850.4 ppm and that required SOM is not being met, taking into account xenon worth.

Required Materials:

  • OP 2208 and form 2208-13 (procedures, equipment, etc.)
  • RE Curve and Data Book (Cycle 24)
  • Calculator General

References:

OP 2208, Section 4.3

      • READ TO THE EXAMINEE ***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

3

JPM WORKSHEET JPMNumber: JPM-A1.2R Revision: 3 Initial Conditions:

  • The plant tripped from 100% steady-state equilibrium power at 1330, after 2 months of operation.
  • On the trip, CEA #1 (Group 7 CEA) stuck fully withdrawn.
  • All other plant components and systems responded as designed.
  • The plant is presently stable at a Tavg of 532 °F and a pressure of 2250 psia.
  • The Chemistry Department sampled the RCS, 15 minutes after the plant trip, and determined the Boron concentration is 650 ppm.
  • Reactor Engineering has indicated core average burnup is 8000 MWD/MTU.

Initiating Cues:

  • The Unit Supervisor has directed you to verify adequate SDM for the first full hour immediately following a plant trip. Utilize OP 2208 "Reactivity Calculations" section 4.3, crediting Xenon Worth hourly and existing plant conditions.
  • Report status of Shutdown Margin to the Unit Supervisor after your calculations crediting xenon hourly worth.
  • An STA review of your results is NOT required.

Simulator Requirements: N/A

  • * * *NOTES TO TASK PERFORMANCE EVALUATOR* * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

4

PERFORMANCE INFORMATION JPMNumber: JPM-A1.2R Revision: 3

~-----------------~

Task

Title:

Determine Shutdown Margin START TIME: - - - -

STEP Performance: Standard: Critical: Grade

  1. 1 OP-2208, Section 4.3 CAUTION: Examinee reads and acknowledges the YD N[g] so uo RCS boron concentration must meet CAUTION.

SHUTDOWN MARGIN requirements of Technical Specifications LCO:

3.1.1.1, when in MODE 3, 4, and 5.

Cue:

Provide examinee with the following items:

  • OP 2208, Reactivity Calculations
  • Blank copy of OPS Form 2208-13, SOM Determination in MODES 3, 4, and 5
  • RE Curve and Data Book
  • Calculator
  • Ruler Comments:

STEP Performance: Standard: Critical: Grade

  1. 2 4.3.1 REQUEST Chemistry Department Examinee notes from the Initial Conditions that YD N[g] so uo sample and determine present RCS Chemistry Department has already sampled boron concentration. the RCS and provided an RCS boron concentration of 650 ppm.

Cue:

Comments:

5

PERFORMANCE INFORMATION JPMNurnber: JPM-A1.2R Revision: 3 Task

Title:

Determine Shutdown Margin STEP Performance: Standard: Critical: Grade

  1. 3 NOTE YD N[Z] so uo
1. All data is recorded and calculated on OP Examinee reads and acknowledges the 2208-013, "SOM Determination in MODEs NOTE.

3, 4 and 5." Additional forms may be used as necessary.

2. SOM Determination may be performed to evaluate anticipated future plant conditions (e.g., due to plant cooldown, plant heatup or Shutdown CEA Groups withdrawn).

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 4 4.3.2 RECORD Date and Time of Examinee records a date and time on OP YD N[Z] so uo calculation. 2208-013.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 5 4.3.3 OBTAIN present Core Burnup from Examinee obtains present core burnup from YD N[Z] so uo one of the following and RECORD: Initial Conditions (8000 MWD/MTU), as
  • "CVBURNUP" (PPC) provided by Reactor Engineering, and records
  • Reactor EnQineerinQ it on OP 2208-013.

Cue:

Comments:

  • Obtained from initial conditions .

6

PERFORMANCE INFORMATION JPM Number: JPM-A 1.2R Revision: 3 Task

Title:

Determine Shutdown Margin STEP Performance: Standard: Critical: Grade

  1. 6 4.3.4 RECORD RCS temperature (TAVG) Examines notes from the Initial Conditions that Y0N[gj so uo for the present OR anticipated plant the RCS TAVG is 532°F and records 532°F on condition. OP 2208-013.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 7 4.3.5 CIRCLE the status of the Shutdown Examines notes from initial conditions that all Y0N[gj so uo CEA Groups position (Shutdown CEA CEAs are inserted except for CEA #1 which is Groups may be withdrawn only in not a Shutdown CEA. Examines circles MODE 3) for the present OR inserted on 2208-13.

anticipated plant condition.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 8 NOTE Y0N[gj so uo
1. Interpolation may be required to Examines reads and acknowledges the determine required xenon free shutdown NOTE.

boron concentration value.

2. RE Curve and Data Book Curve RE-B-03, "Minimum Boron Concentration, No

=

Xenon, Keff 0.99, Shutdown CEAs -

Withdrawn, HZP," can only be used in MODE 3 with RCS average temperature (TAVG) Qreater than or equal to 500°F.

Cue:

Comments:

7

PERFORMANCE INFORMATION JPM Number: JPM-A1 .2R

__:..;:___;___;~...:_~~~~~~~~~~~~~

Revision: 3 Task

Title:

Determine Shutdown Margin STEP Performance: Standard: Critical: Grade

  1. 9 4.3.6 Refer To RE Curve and Data Book and Examinee uses 8000 MWD/MTU as burnup Y~NO so uo DETERMINE the Required Xenon Free value and a Tavg of 532 °F and determines Shutdown Boron Concentration as required shutdown boron concentration from follows: the RE Curve and Data Book (RE-B-01) is
a. IF Shutdown CEA Groups are 786 ppm (Tolerance: 780 ppm to 790 ppm]

inserted, Refer To RE Curve RE-B-01, "3.6% Shutdown Boron Note tabular RE-B-01 provides 786 ppm for Concentration vs. Moderator 8000 MWD/MTU.

Temperature," and DETERMINE the required xenon free shutdown boron concentration as a function of RCS Examinee records required xenon free YON~ so uo temperature (TAVG) and core shutdown boron concentration value of 786 burn up. ppm (780 ppm to 790 ppm) on OP 2208-013"

b. IF Shutdown CEA Groups are in "Required Xe Free CB."

withdrawn OR are anticipated to be withdrawn, Refer To RE Curve RE-B-03, "Minimum Boron Concentration, No Xenon, Keff =

0.99, Shutdown CEAs - Withdrawn, HZP," and DETERMINE the required xenon free shutdown boron concentration as a function of core burnup.

c. RECORD required xenon free shutdown boron concentration value in "Reauired Xe Free CB."

Cue:

Comments:

8

PERFORMANCE INFORMATION JPM Number: JPM-A1 .2R Revision: 3 Task

Title:

Determine Shutdown Margin STEP Performance: Standard: Critical: Grade

  1. 10 NOTE: Examinee reads and acknowledges the Y0Ni:g] so uo FSAR Chapter 14 main steam line break NOTE.

analysis uses the additional 350 ppm boration to disposition a main steam line break event initiated in MODE 3 with SIAS blocked. With SIAS blocked, the accident analysis does not credit boration from the HPSI pumps.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 11 4.3.7 DETERMINE the "Stuck Rod Boron Examinee from initial conditions identifies that Y0N0 so uo Equivalent" as follows: [Ref. 6.5] one regulating CEA did not insert into the core
a. RECORD the number of untrippable when the unit was tripped.

CEAs not inserted. Examinee records one CEA not inserted,

b. MULTIPLY the value recorded in multiplies one times 350 ppm and records step 4.3. 7.a. by 350 ppm. "Stuck Rod Boron Equivalent" as 350 ppm.
c. RECORD result in "Stuck Rod Boron Equivalent."

Cue:

Comments: Recording data is not critical.

9

PERFORMANCE INFORMATION JPMNumber: JPM-A1.2R

~~~~~~~~~~~~~~~~~~~

Revision: 3 Task

Title:

Determine Shutdown Margin STEP Performance: Standard: Critical: Grade

  1. 12 4.3.8 DETERMINE the "Total Required Xe Examinee adds 786 ppm (Required Xe Free Y[gj ND so uo Free CB" as follows: CB") and 350 ppm (Stuck Rod Boron
a. ADD the values of "Required Xe Equivalent) to come up with 1136 ppm.

Free CB" and "Stuck Rod Boron [Tolerance: 1130 ppm to 1140 ppm]

Equivalent."

b. RECORD result in "Total Required Examinee records the Total Required Xe Free Xe Free CB." CB of 1136 ppm on the OP 2208-013 form. YD N[gj so uo Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 13 4.3.9 WHEN sample results are obtained, Examinee records present RCS boron YD N[gj so uo RECORD present RCS Boron concentration of 650 ppm, given in the Initial Concentration. Conditions, on OPS Form 2208-13.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 14 4.3.10 RECORD Date and Time that RCS Examinee records Date and Time that RCS YD N[gj so uo boron sample was obtained. boron sample was obtained on OP 2208-013.

The initial conditions state that the sample was collected today, 15 minutes after the plant trip, at 1345.

Cue:

Comments:

10

PERFORMANCE INFORMATION JPM Number:

-JPM-A1.2R


Revision: 3 Task

Title:

Determine Shutdown Margin STEP Performance: Standard: Critical: Grade

  1. 15 NOTE Examinee reads and understands the note. YON~ so uo SHUTDOWN MARGIN is adequate if the value calculated in step 4.3.11 is positive, which indicates that the present RCS boron concentration is greater than the total required shutdown boron concentration.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 16 4.3.11 SUBTRACT "Total Required Xe Free CB" from present RCS boron Examinee subtracts 1136 ppm (Total Y~NO so uo Required Xe Free CB) from 650 ppm (present concentration and RECORD result RCS boron concentration).

AND sign (-or+) in "SHUTDOWN MARGIN Without Xenon Credit." 650 ppm - 1136 ppm = - 486 ppm, with

[Tolerance: - 480 ppm to - 490 ppm].

Examinee records result (486 ppm) AND sign

(-)in "SHUTDOWN MARGIN Without Xenon YON~ so uo Credit" on the OP 2208-013 form.

Cue:

Comments:

11

PERFORMANCE INFORMATION JPMNumber: JPM-A1.2R Revision: 3 Task

Title:

Determine Shutdown Margin STEP Performance: Standard: Critical: Grade

  1. 17 4.3.12 CHECK that present RCS boron concentration is greater than xenon Examinee compares present RCS born (650 YON~ so uo ppm) against xenon free shutdown boron free shutdown boron concentration. concentration ( 1136 ppm).

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 18 4.3.13 IF present RCS boron concentration Examinee recognizes that present RCS boron YON~ so uo is less than the total required xenon concentration (650 ppm) is less than the total free shutdown boron concentration required xenon free shutdown boron for current plant condition, concentration ( 1136 ppm) for current plant PERFORM one of the following: condition.
  • IF time after shutdown is less than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, Go To step 4.3.15 and PERFORM xenon correction.

Either path, PERFORM xenon correction or YON~ so uo performing Emergency Boration are

  • Refer To AOP 2558, "Emergency acceptable.

Boration," and PERFORM emergency boration and ESTABLISH actual RCS boron concentration to greater than the total required xenon free shutdown boron concentration.

Cue: If examinee decides to Emergency Borate then direct, as the Unit Supervisor, to Go To step 4.3.15 and PERFORM xenon correction. Go to step 4.3.15 and PERFORM xenon correction.

Comments: The initiating cue states that the Unit Supervisor has directed you to verify adequate SOM for the first full hour immediately following a plant trip, taking advantage of the Xenon worth modification option and existing plant conditions.

Step 4.3.14 is N/A since step 4.3.13 sends you directly to step 4.3.15 and step 4.3.14 is for anticipated plant conditions.

12

PERFORMANCE INFORMATION JPM Number: JPM-A1 .2R

~~~~~~~~~~~~~~~~~~~

Revision: 3 Task

Title:

Determine Shutdown Margin STEP Performance: Standard: Critical: Grade

  1. 19 NOTE Examinee reads and understands the note. YD NISI so uo Crediting xenon worth for the next 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period is preferred over hourly calculations.

If the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> xenon corrected shutdown boron concentration is not met, use of the hourly method may be necessary.

Cue:

Comments: The initiating cue states that the Unit Supervisor has directed you to verify adequate SOM for the first full hour immediately following a plant trip 13

PERFORMANCE INFORMATION JPMNumber: JPM-A1.2R Revision: 3 Task

Title:

Determine Shutdown Margin STEP Performance: Standard: Critical: Grade

  1. 20 4.3.15 IF xenon worth credit is applicable (i.e., post trip or shutdown),

Examines recognizes that the initiating cue YD Nrg] so uo directs you to verify adequate SOM for the first PERFORM the following: full hour immediately following a plant trip,

a. DETERMINE the Xenon taking advantage of the Xenon worth Reactivity worth as follows: modification. Therefore step 4.3.15.a.1 and 4.3.15.a.2 are N/A.
1) IF crediting Xenon Worth for the next 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, CHECK the "Next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />" box.
2) IF crediting Xenon Worth for the next 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, Refer To one of the following and DETERMINE xenon reactivity worth expected at the end of the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period:
  • RE Curve and Data Book
  • "XENON-SAMARIUM DEMAND" program (PPG)
  • Reactor Engineering Cue:

Comments:

14

PERFORMANCE INFORMATION JPM Number: JPM-A1 .2R Revision: 3 Task

Title:

Determine Shutdown Margin STEP Performance: NOTE Standard: Critical: Grade

  1. 21 When determining the smallest xenon Examinee reads and understands the note YO NC8;1 so uo reactivity worth expected to occur at any and determines that xenon is building in.

time during the next one hour period, the following should be considered:

  • If xenon is building in, the value at the beginning of the hour should be used.
  • If xenon is decaying, the value at the end of the hour should be used.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 22 3) IF crediting Xenon Worth hourly, CHECK Examinee checks the hourly box on YO NC8;1 so uo the "Hourly" box. OP 2208-013.
4) IF crediting Xenon Worth hourly, Refer To one of the following and DETERMINE the smallest xenon reactivity worth expected within the hour being evaluated:
  • "Xenon-Samarium Post Trip Report" (printed automatically on Control Room printer following reactor trips)

Examinee obtains from the RE Curve and Data Book (RE-C-01) and determines the YC8;] NO so uo

  • RE Curve and Data Book xenon reactivity worth value at the beginning
  • "XENON-SAMARIUM DEMAND" of the hour = 2.676 %Lip (time zero) for MOC program on PPC (8,000 MTD/MTU) life conditions.
  • Reactor Engineering [Tolerance: 2.650 %Lip to 2.700 %Lip]

Cue: If asked which source to use, state that only the RE Curve and Data Book is available for use. (PPC is NOT available.)

Comments:

15

PERFORMANCE INFORMATION JPMNumber: JPM-A1.2R Revision: 3 Task

Title:

Determine Shutdown Margin STEP Performance: Standard: Critical: Grade

  1. 23 5) RECORD the source of the xenon Examinee records RE Curve and Data Book YO NIS:] so uo reactivity data. (RE-C-01) as the source of the xenon
6) RECORD xenon reactivity value in reactivity data on OP 2208-013.

"Xenon p." Examinee records xenon reactivity value of 2.676 %.1p (2.650 -2.700 %.1p) in "Xenon p."

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 24 b. DETERMINE Inverse Boron Worth as Examinee uses 8,000 MWD/MTU burnup to YIS:] NO so uo follows: determine 109.5 ppm/%.1p inverse boron
1) Refer To RE Curve and Data Book, worth from the RE Curve and Data Book (RE-Curve RE-F-02, "Inverse Boron Worth F-02).

versus Burnup, HFP, ARO," and [Tolerance: 109.3 ppm/%.1p to 109.7 DETERMINE Inverse Boron Worth at ppm/%.1p) present burnup.

Examinee records 109.5 ppm/%.1p for Inverse YO NIS:] so uo

2) RECORD Inverse Boron Worth in Boron Worth in "IBW" on OP 2208-013.

"IBW."

Cue:

Comments:

16

PERFORMANCE INFORMATION JPMNumber: JPM-A1.2R Revision: 3 Task

Title:

Determine Shutdown Margin STEP Performance: Standard: Critical: Grade

  1. 25 c. DETERMINE "Boron Equivalent Xe" as Examinee multiplies 2.676 %~p (2.650 - Yi:8] ND so uo follows: 2.700 %~p) "Xenon p" by 109.5 ppm/%~p
1) MULTIPLY "Xenon p" by "IBW." (109.3 - 109.7 ppm/%~p) "IBW."
2) RECORD result in "Boron Equivalent 2.676 %~p x 109.5 ppm/%~p =293.0 ppm Xe." 2.650 %~p x 109.3 ppm/%~p =289.6 ppm 2.700 %~p x 109.7 ppm/%~p =296.2 ppm

[Tolerance: 289.6 ppm to 296.2 ppm]

Examinee records result 293.0 ppm (289.6 ppm to 296.2 ppm) in "Boron Equivalent Xe" YD Ni:8] so uo on 2208-013.

Cue:

Comments:

17

PERFORMANCE INFORMATION JPMNumber: JPM-A1.2R

~-'-~~~~~~~~~~~~~~~~

Revision: 3 Task

Title:

Determine Shutdown Margin STEP Performance: Standard: Critical: Grade

  1. 26 d. RECORD the "Required Xe Free CB" Examinee records the Total Required Xe Free YO N[gj so uo value from step 4.3.8. CB of 1136 ppm on the OP 2208-013 form.
e. DETERMINE Total Required Xe Examinee subtracts "Boron Equivalent Xe" Corrected CB" as follows: from "Total Required Xe Free CB."
1) SUBTRACT "Boron Equivalent Xe" 1136 ppm - 293 ppm = 843.0 ppm Y[gj NO so uo from "Total Required Xe Free CB." 1130 ppm - 296.2 ppm = 833.8 ppm
2) RECORD result in "Total Required Xe 1140 ppm - 289.6 ppm = 850.4 ppm Corrected CB."

[Tolerance: 833.8 ppm to 850.4 ppm]

Examinee records result in "Total Required Xe Corrected CB." YO N[gj so uo Cue: Note, procedure step 4.3.15.e.1 stated "Total Required Xe Corrected Cs"* This should be, as it is on the form "Total Required Xe Free Cs". A procedure change was processed for this JPM to make this correction.

Comments:

STEP Performance: Standard: Critical: Grade

  1. 27 f. RECORD present RCS boron Examinee records present RCS boron YO N[gj so uo concentration value from step 4.3.9 concentration of 650 ppm, given in the Initial
g. RECORD Date and Time that RCS boron Conditions, on OPS Form 2208-13.

sample was obtained in step 4.3.10. Examinee records date and time sample was obtained as stated in the initial conditions; The sample was collected today at 1345.

Cue:

Comments:

18

PERFORMANCE INFORMATION JPMNumber:

-JPM-A1.2R


Revision: 3 Task

Title:

Determine Shutdown Margin STEP Performance: Standard: Critical: Grade

  1. 28 NOTE Examinee reads and understands the note. YO NC8) so uo SHUTDOWN MARGIN is adequate if the value calculated in step 4.3.15.h. is positive, which indicates that the present RCS boron concentration is greater than the total required shutdown boron concentration.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 29 h. SUBTRACT "Total Required Xe Corrected Examinee subtracts 'Total Required Xe YC8) NO so uo CB" from present RCS boron Corrected CB" from present RCS boron concentration and RECORD result AND concentration.

sign (-or+) in "SHUTDOWN MARGIN 650 ppm - 843.0 ppm= - 193.0 ppm With Xenon Credit."

650 ppm - 833.8 ppm = - 183.8 ppm 650 ppm - 850.4 ppm = - 200.4 ppm

[Tolerance: -183.8 ppm to - 200.4 ppm]

Examinee records result (193.0 ppm) AND sign(-) in "SHUTDOWN MARGIN With Xenon YO NC8) so uo Credit."

Cue:

Comments:

19

PERFORMANCE INFORMATION JPM Number: JPM-A1 .2R Revision: 3

~----'----------------~

Task

Title:

Determine Shutdown Margin STEP Performance: Standard: Critical: Grade

  1. 30 i. CHECK that present RCS boron Examinee checks present RCS boron Y[gj ND so uo concentration is greater than the total concentration is greater than the total required required xenon corrected shutdown boron xenon corrected shutdown boron concentration. concentration.

Examinee determines the total required xenon corrected shutdown boron concentration is greater than present RCS boron concentration and that required SOM is not met.

Cue:

  • Inform Examinee that an STA review of the results is NOT required (if asked) .
  • State this JPM is complete .

Comments:

TERMINATION CUE: The evaluation for this JPM is concluded.

STOP TIME: - - -

20

VERIFICATION OF JPM COMPLETION JPMNumber: JPM-A1.2R Revision: 3 Date Performed:

Student:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

EVALUATION SECTION:

Time Critical Task? D Yes l?S] No Validated Time (minutes): Actual Time to Complete (minutes):

I 25 I Work Practice Performance: D SAT D UNSAT Operator Fundamentals: D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question #1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:

Print I Sign Areas for Improvement I Comments:

21

STUDENT HANDOUT JPMNumber: JPM-A1.2R Revision: 3 Initial Conditions:

  • The plant tripped from 100% steady-state equilibrium power at 1330, after 2 months of operation.
  • On the trip, CEA #1 (Group 7 CEA) stuck fully withdrawn.
  • All other plant components and systems responded as designed.
  • The plant is presently stable at a Tavg of 532 °F and a pressure of 2250 psia.
  • The Chemistry Department sampled the RCS, 15 minutes after the plant trip, and determined the Boron concentration is 650 ppm.
  • Reactor Engineering has indicated core average burnup is 8000 MWD/MTU.

Initiating Cues:

  • The Unit Supervisor has directed you to verify adequate SOM for the first full hour immediately following a plant trip. Utilize OP 2208 "Reactivity Calculations" section 4.3, crediting Xenon Worth hourly and existing plant conditions.
  • Report status of Shutdown Margin to the Unit Supervisor after your calculations crediting xenon hourly worth.
  • An STA review of your results is NOT required.

22

Form Approval I Approval Date Effective Date 5/30/2016 6/7/2016 Form Cover S/Jeet Generic Information I Form Title Rev. No.

Shutdown Margin Determination in MODEs 3, 4 and 5 009 Reference Procedure Applicable Tech. Spec. Frequency OP 2208 This form is being used for the following:

0 System Alignment 0 Preventative Maintenance 0 Other:

0 Maintenance Restoration (Retest)

Specific Information I OP 2208-13 Rev. 009 Pa e 1of5

Shutdown Margin Determination in MODEs 3, 4 and 5 Step No. Calculation Date Calculation Time 4.3.2 T,, ,Jc..;;. d.1 1-e ,/

I I,.,,,...<!.. Tc*,,Jc,_y v

Shutdown Boron Concentration Determination Step No. Parameter/Calculation Value 4.3.3 Core Burnup 8/()()[J MWD/MTU

/

4.3.4 RCS Average Temperature (TAvG) op 532.

/

~

Shutdown CEA Groups Position 4.3.5 Withdrawn (Circle applicable value) i-'

4.3.6 Shutdown Boron Concentration, No Xenon 78b ppm Required Xe Free CB i/

4.3.7 ( I )X350ppm 3.~*o ppm i,/

  1. of untrippable CEAs Not Inserted v' Stuck Rod Boron Equivalent 4.3.8 ( 7'ef£, )+( 35*0 ) tl3b ppm Required Xe Free CB Stuck Rod Boron Equivalent Total Required Xe Free CB /

Present RCS Boron Concentration Step No. Parameter Value 4.3.9 RCS Boron Concentration 650 ppm /

v Present RCS CB 4.3.10 RCS Boron Sample Date and Time Date: *;1.;~J4:1 ,_, Time: l5'fS- ,/

Clt1/e SHUTDOWN MARGIN Without Xenon Credit Step No. Parameter/Calculation Value 4.3.11 ( 6 5l> )- ( 113(:) )

/ i/

Present RCS CB Total Required Xe Free CB ~) 486 ppm Acceptance Criteria SHUTDOWN MARGIN is adequate if this value is positive indicating that present RCS Boron Concentration is greater than the Total Required Xenon Corrected Shutdown Boron Concentration.

Determined By:

STA Review:

OP 2208-13 Rev.009 Page 2 of 5

Shutdown Margin Determination in MODEs 3, 4 and 5 Xenon Correction of Shutdown Boron Concentration Step No. Parameter/Calculation Value Xenon Reactivity (Next 24 Hours O Houri~ Gr) (~~0 7b  %~p 4.3.15.a. (Indicate source used: g(; C.vl'v't; r- J}*~ r'- )., / Xenon p /'

I D'l. !J. ppm/%~p 4.3.15.b. Inverse Boron Worth 1/

IBW f pNi

( J.rv 1b ~Ike )x c l O'i. 5

  • - ) *a~,

3 ppm 4.3.15.c.

Xenon p v IBW /i,Ke j Boron Equivalent Xenon v/

4.3.15.d.

Total Required Xenon Free Shutdown Boron I 13b ppm Concentration (from step ) Total Required Xe Free CB /

( JI 3b )- ( ~c,3 ) 043 ppm 4.3.15.e.

Total Required Xe Free CB Boron Equivalent Xe Total Required Xe Corrected CB v/

Present RCS Boron Concentration Step No. Parameter Value 05D ppm 4.3.15.f. RCS Boron Concentration //

Present RCS CB 4.3.15.g. RCS Boron Sample Date and Time Date: /i.,t'd" Time:

dct I l/

34r;'

SHUTDOWN MARGIN With Xenon Credit Step No. Parameter/Calculation Value

( r;,,_50 )- ( '8i/ *3 ) v" ...

~,,,., ~

4.3.15.h.

Present RCS CB / Total Required Xe Corrected CB

./

(-) lCf 3 ppm Acceptance Criteria SHUTDOWN MARGIN is adequate if this value is positive indicating that present RCS Boron Concentration is greater than the Total Required Xenon Corrected Shutdown Boron Concentration.

Determined By:

STA Review:

OP 2208-13 Rev. 009 Page 3 of 5

Shutdown Margin Determination in MODEs 3, 4 and 5 II Hourly Xenon Correction Log Present RCS Boron Total Required Xanon Shutdown Margin with Determined STA Date Time Xenon Credit By Review Concentration Corrected CB 1 ppm - ppm = ( ) ppm 2 ppm - ppm = ( ) ppm 3 ppm - ppm = ( ) ppm 4 ppm - ppm = ( ) ppm 5 ppm - ppm = ( ) ppm 6 ppm - ppm = ( ) ppm 7 ppm - ppm = ( ) ppm 8 ppm - ppm = ( ) ppm 9 ppm - ppm = ( ) ppm 10 ppm - ppm = ( ) ppm 11 ppm - ppm = ( ) ppm 12 ppm - ppm = ( ) ppm

~~~~~~~-~~ Acceptance Criteria SHUTDOWN MARGIN is adequate if this value is positive indicating that present RCS Boron Concentration is greater than the Total Required Xenon Corrected Shutdown Boron Concentration.

OP 2208-13 Rev. 009 Page 4 of 5

Shutdown Margin Determination in MODEs 3, 4 and 5 I

Hourly Xenon Correction Log Present RCS Boron Total Required Xanon Shutdown Margin with Determined STA Date Time Corrected Cu Xenon Credit By Review Concentration 13 ppm - ppm = ( ) ppm 14 ppm - ppm = ( ) ppm 15 ppm - ppm = ( ) ppm 16 ppm - ppm = ( ) ppm 17 ppm - ppm = ( ) ppm 18 ppm - ppm = ( ) ppm 19 ppm - ppm = ( ) ppm 20 ppm - ppm = ( ) ppm 21 ppm - ppm = ( ) ppm 22 ppm - ppm = ( ) ppm 23 ppm - ppm = ( ) ppm 24 - =

ppm ppm ( ) ppm Acceptance Criteria SHUTDOWN MARGIN is adequate if this value is positive indicating that present RCS Boron Concentration is greater than the Total Required Xenon Corrected Shutdown Boron Concentration.

OP 2208-13 Rev. 009 Page 5 of 5

JOB PERFORMANCE MEASURE APPROVAL SHEET JPM

Title:

Complete "A" SW Pump Operability Surveillance, SP 2612A-003 JPMNumber: JPM-A2R Revision: 0/0 Initiated:

Robert L. Cimmino, Jr. (Signature on File) 01/23/2017 Developer Date Reviewed:

Will Chesnutt (Signature on File) 01/27/2017 Technical Reviewer Date Approved:

Mike Cote (Signature on File) 01/24/2017 Supervisor, Nuclear Training Date 1

SUMMARY

OF CHANGES DATE DESCRIPTION REV/CHANGE 01/04/2017 Initial JPM creation for 2017 NRC Exam Re-Take 010 2

JPM WORKSHEET Facility: MP2 Exarninee:

JPMNumber: A2R Revision:

- -0/0 Task

Title:

Complete "A" SW Pump Operability Surveillance, SP 2612A-003 System: Service Water Time Critical Task: DYES ~NO Validated Time (minutes): 15 Task Number(s): 076-01-096 Applicable To: SRO x STA RO x PEO KIA Number: 2.2.12 KIA Rating:

- - -3.7/4.1 Method of Testing: Simulated Performance: Actual Performance: x Location: Classroom: x Simulator: In-Plant:

Task Standards: At the completion of this JPM the exarninee will have completed surveillance form SP 2612A-003 IAW SP 2612A; calculates the "A" SW pump ~P, determines Mis UNSAT, and notifies the US of the UNSAT results.

Required Materials: SP 2612A, "A" Service Water Pump Tests procedure.

(procedures, equipment, etc.) SP 2612A-003, "A" SW Pump and Facility 1 Discharge Check Valve IST form.

General

References:

SP 2612A, "A" Service Water Pump Tests procedure.

      • READ TO THE EXAMINEE ***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

3

JPM WORKSHEET JPMNumber: JPM-A2R Revision: 0/0 Initial Conditions:

  • Plant is in Mode 1, all conditions normal.
  • "A" Service Water Pump surveillance SP 2612A is being performed following an overhaul of the pump strainer.
  • Only the pump IST is being performed. The flush valve and check valve tests are not required.
  • All vibration data has been recorded on SP 2612A-003.

Initiating Cues: The US has directed you to complete surveillance form SP 2612A-003, from step 4.1.l lc.1 through step 4.1.19, using the below listed data, which was obtained simultaneously. Section 4.1 has been completed up to and including step 4.1.1 lb.

  • Discharge Pressure indication on PI-6474 (local)= 38.5 psig
  • "A" SW Header Flow indication on FIT-6471=10,500 gpm
  • Temp Flow Meter at Strainer Backwash Piping flow= 0 gpm
  • Distance from floor to Circ Water Bay Level= 12.43 ft Simulator Requirements: NIA
        • NOTES TO TASK PERFORMANCE EVALUATOR****
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

4

PERFORMANCE INFORMATION JPM Number: JPM-A2R Revision: 0/0

--=...::....:.:..:::....=..==-=------------~-~

Task

Title:

Complet~"A" SW Pump Operability Surveillance, SP 2612A-003 STARTTThfE: - - - -

STEP Performance: Standard: Critical: Grade

  1. 1 SP 2612A~ "A" SW Purol! Tests YO Nrgj so uo 4.1.11 WHEN "A" Service Water Pump has Examinee enters applicable data from hritial operated for at least two minutes with Conditions onto form SP 2612A-003 under "Data":

stable system flowrate of 10,500 gpm

  • 38.5 at step 4.1.1 lc. l)

(10,300 to 10,700 gpm), PERFORM the

  • 10,500 at step 4.1.llc.2) following:
  • 0 at step 4.1.1 lc.3)
a. NI A [completed per IC]
b. NI A [completed per IC]
c. OBTAIN the following simultaneously, and RECORD on SP 2612A-003:
1) "A" Service Water Pump discharge pressure (PI-6474, strainer inlet pressure).
2) Service Water Header "A" flow (FIT-6471).
3) Strainer backwash discharge flow from temporary flow meter.

Cue:

Comments: Examinee will calculate total SW flow and determine IST acceptance criteria is SAT.

5

PERFORMANCE INFORMATION JPM Number: JPM-A2R

--=..:=:..::....=.:==-=-~~~~~~~~~~~~~~~

Revision: 0/0 Task

Title:

Complete "A" SW Pump Operability Surveillance, SP 2612A-003 STEP Performance: SP 2612A (cont) Standard: Critical: Grade

  1. 2 4.1.12 OBTAIN "A" Service Water Pump sea Examinee records distance from floor to CW bay YO N[gj so uo level, by performing the following: level (12.43 ft) on form SP 2612A-003 at step
a. REQUEST local operator to Refer To 4.1.12b under "Level Indicator Data".

Attachment 3 and measure the distance Examinee calculates Sea Level as:

from floor to circulating water bay level.

b. RECORD distance from floor to Exarninee calculated sea level; Y[gj NO so uo circulating water bay level on SP 2612A- (14- 12.43 = 1.57 ft) [Tolerance: 1.5 to 1.6]

003.

c. RECORD water level indicator NQ Examinee records 1.57 on SP 2612A-003, step YO N[gj so uo Number on SP 2612A-003 cover page. 4.1.12e under "Calculated Data".
d. CALCULATE sea level as follows:

Sea level = 14 - Distance from floor to water level

e. RECORD sea level on SP 2612A-003.

Cue:

Comments: Recording of data is NOT critical.

STEP Performance: SP 2612A (cont) Standard: Critical: Grade

  1. 3 4.1.13 CALCULATE pump suction pressure as Examinee calculates pump suction pressure as:

Y[gj NO so uo follows:

[1.57 x 0.45 = 0.71]

Suction pressure = Sea level x 0.45

[Tolerance: 0.675 to 0.72]

Cue:

Comments:

6

PERFORMANCE INFORMATION JPM Number: .....:JP=-::....::M.:..:::....:-A.:::2:::R~-------------- Revision: 0/0 Task

Title:

Complete "A" SW Pump Operability Surveillance, SP 2612A-003 STEP Performance: SP 2612A (cont) Standard: Critical: Grade

  1. 4 4.1.14 RECORD pump suction pressure on Examinee records suction pressure [O. 71] on YO N[ZJ so uo SP 2612A-003. SP 2612A-003, step 4.1.14 under "Data".

Cue:

Comments:

STEP Performance: SP 2612A (cont) Standard: Critical: Grade

  1. 5 4.1.15 Using step 4.1.1 lc.1) and 4.1.14 Examinee calculates "A" SW Pump ~p Y[ZJ NO so uo pressures, PERFORM the following:

~p =Discharge (38.5) - Suction (0.71)= 37.8 psig

a. CALCULATE "A" SW Pump ~pas follows: [Tolerance: 37.78 to 37.82)

LlP = Discharge - Suction pressure

b. RECORD "A" SW Pump ~p on Examinee records ~p (37.8 psig) on SP 2612A- YO N[ZJ so uo SP 2612A-003. 003, step 4.1.15b. under"Data".

Cue:

Comments: Recording of data is NOT critical.

STEP Performance: SP 2612A (cont) Standard: Critical: Grade

  1. 6 4.1.16 DOCUMENT "A" SW Pump ~p Results Examinee documents "A" SW Pump ~p Results on Y[ZJ NO so uo SP 2612A-003. SP2612A-003, step 4.1.16 as "UNSAT" for both "Acceptable" and "Normal" limits.

Cue:

Comments:

7

PERFORMANCE INFORMATION JPM Number: JPM-A2R

-=-::...::..::.....:..=:=-=.~~~~~~~~~~~~~~~

Revision: 0/0 Task

Title:

Complete "A" SW Pump Operability Surveillance, SP 2612A-003 STEP Performance: SP 2612A (cont) Standard: Critical: Grade

  1. 7 4.1.17 DOCUMENT "A" Service Water Pump Examinee documents "A" SW Pump vibration YD NIZ;J so uD vibration Results on SP 2612A-003. Results on SP2612A-003, step 4.1.17 as "SAT" for both "Acceptable" and "Normal" limits.

Cue:

Comments:

STEP Performance: SP 2612A (cont) Standard: Critical: Grade

  1. 8 4.1.18 DOCUMENT "A" Service Water Pump Examinee documents "A" SW Pump Operational YD NIZ;J so uD Operational Readiness Results on SP Readiness Results on SP2612A-003, step 4.1.18 as 2612A-003. "UNSAT".

Cue:

Comments: Recording of data is NOT critical.

STEP Performance: SP 2612A (cont) Standard: Critical: Grade

  1. 9 4.1.19 IF "A" Service Water Pump Operational Examinee refers to Att. 1, Actions for IST Data YIZ;J NO so uD Readiness Results "UNSAT," Refer To Outside "Acceptable" Limits, and notifies the US Attachment 1. that of the "UNSAT" results.

Cue:

Comments: Once the Examinee has notified the US of the UNSAT results per Step 1 of Attachment 1, the JPM is complete.

TERMINATION CUE: The evaluation for this JPM is concluded.

STOPTThlE: - - -

8

VERIFICATION OF JPM COMPLETION JPMNumber: JPM-A2R Revision: 0/0 Date Performed:

Student:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

EVALUATION SECTION:

Time Critical Task? 0 Yes [;8J No Validated Time (minutes): 15 Actual Time to Complete (minutes):

I I Work Practice Performance: D SAT D UNSAT Operator Fundamentals: D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question # 1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:

Print I Sign Areas for Improvement I Comments:

9

STUDENT HANDOUT JPMNumber: JPM-A2R Revision: 0/0 Initial Conditions:

  • Plant is in Mode 1, all conditions normal.
  • "A" Service Water Pump surveillance SP 2612A is being performed following an overhaul of the pump strainer.
  • Only the pump IST is being performed. The flush valve and check valve tests are not required.
  • All vibration data has been recorded on SP 2612A-003.

Initiating Cues: The US has directed you to complete surveillance form SP 2612A-003, from step 4.1.11 c.1 through step 4.1.19, using the below listed data, which was obtained simultaneously. Section 4.1 has been completed up to and including step 4.1.11 b.

  • Discharge Pressure indication on PI-6474 (local)= 38.5 psig
  • "A" SW Header Flow indication on FIT-6471 = 10,500 gpm
  • Temp Flow Meter at Strainer Backwash Piping flow = 0 gpm
  • Distance from floor to Circ Water Bay Level= 12.43 ft 10

Form Approval I Approval Date Effective Date 11/23/15 11/23/15 Suveillance Form Generic Information Form Title Rev. No.

A!' SW Pump and Facility 1 Discharge Check Valve IST 008 Reference Procedure Applicable TS{TRM Applicability (TS{TRM) Frequency SP 2612A 4.0.5; TRM Table All MODEs Every 92 days (Q) 7.1.21-2 Item A Specific Information I Schedule Start Date WO Number AlA ~ Mntc Restoration Performance Modes All I Prerequisites Completed (Initials) Precautions Noted (Initials) I xi Yes DNo

~ .cJ

{,-/,i_ ;c-;..~"~

F Test Authorized By U111 f S'vf} e .--v; ~ vr ,7 - .

Date

,-iv J/1~ Partial Surveillance Performed By (Print/Sign) I Date 17 [iJ Yes DNo Accepted By (Print/Sign) Date Acceptance Criteria Satisfied Approved By (Department Head or Designee) Date OYes DNo Surveillance Information I Test Equipment Type QA Number Cal Due Date Vi' ,. ;,,, An,:ilvzer (Vt r..-d"?,l/Y1 tf-/3 o/J7 A,.,.,,let " ~ Ml£ -/J;.'11..( ( .'/17 1

Water Level Indicator NO# <Y'Jr75 ("""" 7)1r/17 Stoowatch }/\le:- '* ,tJ 52..t.b '8'/3;/; 7 Stopwatch Temporary Flow Meter .'11\ n:: -it. 3 '61 7/i-1 In I Comments I CR#

NOTE: Following acceptance, copy FORWARDED to IST Coordinator. D Initial SP 2612A-003 Rev. 008 Page 1of6

' I..

Al.' SW Pump and Facility 1 Discharge Check Valve IST Installation of Temp Flow Meter (Step 4.1.1 a.)

SM approval to INSTALL temporary flow meter:

lv'4 11,,.,,..

~

SM signature Step A/11 Action

<1. ~ Date A//f. 11.A Performer

- l.V.

4.1.lb.

PDM to install temporary flow meter on service water strainer backwash piping

~

~vA- v? '~

4.1.lc.

Perform IV for installation of temporary flow meter on service water backwash piping

~

2-SW-90A, "'A' SERVICE WATER PUMP STRAINER FLUSH," Stroke and Timing Step Parameter Limits Minimum Data (sec) Maximum 2-SW-90A Acceptable" NIA 14.72 open stroke time 7"')5 Baseline= 7.36 sec "Normal" 3.68 11.04 4.l.5f./h.

2-SW-90A Acceptable" NIA NIA close stroke time '-/. "i 3 (Augmented) "Normal" NIA NIA Step Parameter IST Acceptance Criteria Results Initials 2-SW-90A Within IST "Normal" limits "SAT"~ 4J--

stroke times "UNS.A: '

4.l.5j./k. The following are met:

2-SW-90A

Readiness IST Acceptable" limits

  • Valve completed one full cycle "UNSAT" D ~

2-SW-1A, "'A' SERVICE WATER PUMP DISCHARGE CHECK," Open Check IST Acceptance Criteria Step No. Parameter Indicator Minimum Data (gpm) Maximum Service Water Header 4.l.9a. }!('flow FIT-6471 10,300 tf/, c;r>1>' 10,700 Parameter IST Acceptance Criteria Results Initials 4.l.9b. SW Header }!(' flow within "SAT" @'

2-SW-lA Open Check IST Acceptance Criteria" "UNSAT" D 9--

SP 2612A-003 Rev. 008 Page 2 of 6

'W' SW Pump and Facility 1 Discharge Check Valve IST "I(' SW Pump Vibration Level Data Step Parameter IST Acceptance Criteria Vibration Measurement Acceptable Limits Data (in/sec) Normal Limits Point MOH Baseline= .102 <0.612 t5 ~ /'}.. > <0.255 MOV Baseline= .134 <0.700 0J1'6£, <0.325 MOA Baseline= .055 <0.330 rzs~ i,0c;t <0.137 4.1.lla.

MIH Augmented <0.420 fe:,. I¢/ 2 NIA MIV Augmented <0.330 Jl') , {lf' i NIA MIA Augmented <0.234 f!5. d? t/ NIA "I(' SW Pump Discharge Pressure Step Parameter Indicator Data (psig) 4.1.llc.l) Discharge pressure PI-6474 (local) 38-.;

N' SW Header Flow IST Acceptance Criteria Step Parameter Indicator Minimum Data (gpm) Maximum Service Water Header "Pl' FIT-6471 /0/ <.:; b 0 flow 4.1. llc.2)1 Temp Flow Meter at

3) strainer backwash piping 0 Total Flow 10,300 10 I '5-ou 10,700 Item IST Acceptance Criteria Results Initials 4.1.llc. Meets IST Acceptance "SAT" ~*

SW Header PC flow Criteria "UNSAT" 0 YL-Intake Structure Level and "I(' SW Pump Suction Pressure Calculation Step Parameter Indicator Data (ft)

Distance from floor to Circ Water Bay level Level Indicator i,~.Lf 3 4.l.12b./e. Sea level (Sea level= 14 - Distance from floor to water level)

Calculated / . .>7 Indicator Data (psig) 4.1.14 Suction pressure Calculated (Note 1.) o. 11 Note 1. Suction pressure (psig) =Sea level x 0.45 SP 2612A-003 Rev. 008 Page 3 of 6

'W.' SW Pump and Facility 1 Discharge Check Valve IST "Ii.' SW Pump AP IST Acceptance Criteria Step Parameter Limits Min Data (psid) Max

N..' SW Pump ~p Acceptable" 40.97 48.45 4.l.15b. Baseline = 44.05 psid 3 7. 'I (Note 2.) "Normal" 41.85 NIA Note 2. LJP (psid) =Discharge - Suction Pressure Step Item Results Initials "SAT" D

N..' SW Pump ~p is within IST Acceptable" limits //t-.-

"UNSAT" ~ ~,,

4.1.16 "SAT" D ,.., ..,

N..' SW Pump ~p is within IST "Normal" limits ( '

"UNSAT" lkl ,p/¥;;...,-z._-.,-

  • ~* SW Pump Vibration Level Data Step Item Data Initials All N..' SW Pump vibration data is within "SAT" ~

IST Acceptable" limits "UNSAT" D 0**

4.1.17 All N..' SW Pump vibration data is within IST "Normal" limits "SAT" "UNSAT" D rig

(

r

  • ~* SW Pump Operational Readiness IST Acceptance Step Parameter Data Initials Criteria All within IST "Acceptable" limits:

N..' SW Pump * N..' SW Pump ~p Operational

"SAT" [I <..<?--

4.1.18 "UNSAT" }4 Readiness total flow

  • N..' SW Pump vibration SP 2612A-003 Rev. 008 Page 4 of 6

'W' SW Pump and Facility 1 Discharge Check Valve IST 2-SW-18, "'B' SERVICE WATER PUMP DISCHARGE CHECK," Closure Check Step Parameter IST Acceptable Limit Results Initials "SA'l"'

4.1.23 "B" SW Pump No reverse rotation observed "UN~A?o tV/f-~

~

d./e. All within IST '1\cceptable" limits:

2-SW-lB closed * 'W..' SW Pump ~p " 0 NJ '9---

  • "B" SW Pump reverse rotation

" N .T" n-

"Ii' SW Pump Reverse Rotation Check Step Parameter IST Acceptable Limit Results Initials 4.1.26 }(' SW Pump No sustained reverse rotation observed "SAT" ~TIT <._?.....- ***-

"U ,, n . "B" SW Pump Discharge Pressure Step Parameter Indicator Data (psig) 4.1.28c.l) Discharge pressure PI-6480 (local) #If Qi.-

2-SW-18, "'B' SERVICE WATER PUMP DISCHARGE CHECK," Open Check IST Acceptance Criteria Step Parameter Indicator Min Data (gpm) Max Service Water Header 4.1.28c.2) }('flow FIT-6471 10,300 Nf a._.....__ 10,700 Item IST Acceptance Criteria Results Initials 4.1.28d.

2-SW-lB Open Check SW Header 'W..' flow within IST '1\cceptance Criteria" "S~

"U ,,

ti/Jr 0-Intake Structure Level and "B" SW Pump Suction Pressure Calculation Step Parameter Indicator Data (ft)

Distance from floor to Circ Water Bay level Level Indicator ;v4 /1--

4.1.29b./d. Sea level (Sea level = 14 - Distance from floor to Calculated ;vJr ,ry-water level)

Data Indicator 4.1.31 Suction pressure (psig)

Calculated (Note 3.) NA-,,,,,_.

Note 3. Suction pressure (psig) = Sea level x 0.45 SP 2612A-003 Rev. 008 Page 5 of 6

'W' SW Pump and Facility 1 Discharge Check Valve IST "B" SW Pump AP IST Acceptance Criteria Step Parameter Limits Minimum Data (psid) 4.l.32b. "B" SW Pump i1P (Note 4.) '~cceptable" 38.6 ,/\/A-

, .4-"

Note 4. LJP (psid) = Discharge - Suction Pressure Step Item IST Acceptance Criteria Results Initials Within IST '~cceptable" "S~l"iu\)'. Ej 4.1.33 "B" SW Pump i1P limits "U~il"W Alf~

2-SW-1A, "'A' SERVICE WATER PUMP DISCHARGE CHECK," Closure Check Step Parameter IST Acceptance Criteria Results Initials All within IST '~cceptable" limits:

4.1.34 2-SW-lA Closure Check

  • 'W' SW Pump reverse rotation "S~

"U "

t-rA-Yv

  • "B" SW Pump i1P 2-SW-18, "'B' SERVICE WATER PUMP DISCHARGE CHECK," Closure Check Step Parameter IST Acceptable Limit Results Initials "B" SW Pump No reverse rotation observed "UNSAT.~>*-~ tJA <iv "S-M" 4.1.36 ..-<v~

i./j. All within IST '~cceptable" limits: ,, D tJA-

"S 2-SW-lB closed * "JC SW Pump i1P ~

" SAT" 0-

  • "B" SW Pump reverse rotation SW Pump Strainer Control Restoration Step Parameter Performer l.V.

'W' SW Pump Strainer switch returned to '~UTO" 4.1.39 "B" SW Pump Strainer switch returned to '~UTO" AJfi- ~ J}UA /J,,, /

Removal of Temp Flow Meter (Step 4.1.40a.)

SM approval to REMOVE temporary flow meter:

SM signature Date Step Action Performer l.V.

-~

PDM to remove temporary flow meter on service ...--*""'

4.l.40b.

water strainer backwash piping l~ ~*~-

4.l.40c.

Perform IV for removal of temporary flow meter on (

service water backwash piping SP 2612A-003 Rev. 008 Page 6 of 6

JOB PERFORMANCE MEASURE APPROVAL SHEET JPM

Title:

Review RWP and Survey Map JPMNumber: JPM-A3R Revision: 0 Initiated:

John W. Riley (Signature on File) 1/23/17 Developer Date Reviewed:

Will Chesnutt (Signature on File) 1127/17 Technical Reviewer Date Approved:

Michael John Cote (Signature on File) 1/26/17 Supervisor, Nuclear Training Date 1

SUMMARY

OF CHANGES DATE DESCRIPTION REV/CHANGE 1111/2017 New JPM for 2017 NRC JPM exam re-take. Similar JPMs are in 0 the bank but task (vent a pump) and area have been changed.

2

JPM WORKSHEET Facility: MP2 Examinee:

JPMNumber: JPM-A3R Revision: 0 Task

Title:

Review RWP and Survey Map System: Radiation Control Time Critical Task: DYES [ZI NO Validated Time (minutes): 15 Task Number(s):

Applicable To: SRO x STA RO x PEO KIA Number: 2.3.7 KIA Rating: 3.5 I 3.6 Method of Testing: Simulated Performance: Actual Performance: x Location: Classroom: x Simulator: In-Plant:

Task Standards: At the completion of this JPM the examinee has reviewed the applicable RWP and survey map to determine the specified radiological requirements to perform the assigned task.

Required Materials: RWP 2170002 (procedures, equipment, etc.) Millstone Nuclear Power Station - Radiation Survey Figure No. 27 Unit 2, -45 Safeguards, Aerated Waste Tank and Pump Rooms.

General

References:

MP-PROC-HP-RPM 5.2.2[r016] Basic Radiation Worker Responsibilities

      • READ TO THE EXAMINEE ***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

3

JPM WORKSHEET JPMNumber: JPM-A3R Revision: 0 Initial Conditions:

  • The plant is in MODE 1 operating at 100% power.
  • Maintenance on the "A" CS pump has been completed.
  • All pump tagging has been removed with the exception of the pump breaker. The pump breaker remains racked down and RED TAGGED.
  • The suction, discharge, recirculation, vent and drain valves are all closed in preparation for filling and venting of the pump.

Initiating Cues:

  • You have been directed to fill and vent the "A" CS pump (P43A). The pump casing vent only needs to be vented and this vent is reached without climbing.
  • Hoses need to be installed for venting.
  • The duration of filling and venting the "A" CS pump (P43A) is expected to take half an hour.
  • All radiological protective action for this work is contained in the RWP.

There are no additional radiological protective action requirements in the Operating procedure for filling and venting the pump.

  • State the radiological requirements for entering this area. Include in your answer:
1. WhichRWP task (job step) is appropriate for this assignment.
2. Highest radiation level in the work area around the pump (including units of measure).
3. Highest contamination level in the area of the pump (including units of measure).
4. Protective clothing required to perform venting operations.
5. Expected dose for this assignment area for you only (including units of measure)
6. Dose rate alarm (including units of measure)

The examiner will act as Health Physics (HP) for any related questions.

Simulator Requirements: NIA

        • NOTES TO TASK PERFORMANCE EVALUATOR****
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question stl,ldent for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

4

PERFORMANCE INFORMATION JPM Number: JPM-A3R Revision: 0 Task

Title:

Review RWP and Survey Map START TIME: - - - -

STEP Performance: Standard: Critical: Grade

  1. 1 Examinee reviews RWP 2170002, Nuclear Station YON~ so uo Review R WP 2170002, Nuclear Station Operations and Maintenance Radiation Work Operations and Maintenance Radiation Work Permit (RWP).

Permit (RWP).

Examinee reviews Millstone Nuclear Power Review Millstone Nuclear Power Station - Station - Radiation Survey Figure No. 27 Unit 2, -

Radiation Survey Figure No. 27 Unit 2, -45 45 Safeguards, Aerated Waste Tank and Pump Safeguards, Aerated Waste Tank and Pump Rooms.

Rooms.

Cue:

  • Provide examinee with RWP 2170002, Nuclear Station Operations and Maintenance Radiation Work Permit.
  • Provide examinee Millstone Nuclear Power Station-Radiation Survey Figure No. 27 Unit 2, -45 Safeguards, Aerated Waste Tank and Pump Rooms
  • Provide a calculator.

Comments:

STEP Performance: Standard: Critical: Grade

  1. 2 1. Determine which RWP task Gob step) is Examinee states that task Gob step) No. 1 is Y~NO so uo appropriate for this assignment. appropriate for this task. Task #1 is Operations:

Perform routine work activities in RCAs and Radiation Areas: routine surveillance, rounds, system operation and restoration, tagging, walk downs and inspections.

Cue:

Comments:

5

PERFORMANCE INFORMATION JPMNumber: JPM-A3R Revision: 0 Task

Title:

Review RWP and Survey Map STEP Performance: Standard: Critical: Grade

  1. 3 2. Determine the highest radiation level in Examinee states that highest radiation level in the Y[g] NO so uo the area around the "A" CS pump area around the "A" CS pump (P43A) is 5 mrem/hr (P43A) (including units of measure). (2.4 mrem/hr to 5 mrem/hr is acceptable)

Cue:

Comments: Note mr/hr is the same as mrem/hr STEP Performance: Standard: Critical: Grade

  1. 4 3. Determine the highest contamination Examinee states that the contamination level in the Y[g] NO so uo level in the area around the "A" CS area around the "A" CS pump (P43A) area is 2

pump (P43A) (including units of < lk DPM/100 cm measure).

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 5 4. Determine the minimum protective Examinee states that as a minimum lab coats and Y[g] NO so uo clothing required for hooking up hoses to rubber gloves shall be worn when hoses are be used for the venting. connected to contaminated systems.

Cue:

Comments:

Reference page 4 of Job Step 1, specifies 7.3 ofRWP 2170002. It is acceptable if the examinee includes shoe covers since HP might specify this requirement in the brief.

STEP Performance: Standard: Critical: Grade

  1. 6 5. Determine the expected dose for this Examinee states that the expected dose is between Y[g] NO so uo assignment, (including units of measure). 1.2 to 2.5 mrem.

Cue:

Comments:

The exarninee could estimate high (conservative) using 5 mrem/hr Dose Rate X 1/2 hr = 2.5 mrem, or could use what appears to be the closes radiation reading to the pump 2.4 mrem/hr which would be 2.4 mrem/hr X 1/2 hr= 1.2 mrem Note mr is the same as mrem 6

PERFORMANCE INFORMATION JPMNumber: JPM-A3R Revision: 0 Task

Title:

Review RWP and Survey Map STEP Performance: Standard: Critical: Grade

  1. 7 6. Determine the expected dose rate alarm Examinee states that the dose rate alarm is 20 Y~ND so uo for this assignment, (including units of mrem/hr.

measure).

Cue:

Comments: Note mr/hr is the same as mrem/hr TERMINATION CUE: The evaluation for this JPM is concluded.

STOP TIME: - - -

7

PERFORMANCE INFORMATION JPM Number: JPM-A3R Revision: 0 Task

Title:

Review RWP and Survey Map Task #1 is Operations: Perform routine work activities in RCAs

1. RWP Task and Radiation Areas: routine surveillance, rounds, system operation and restoration, tagging, walk downs and inspections.
2. Highest Radation level in 5 mrem/hr (2.4 to 5 mrem/hr is acceptable) pump area (units of measure)
3. Highest contamination Contamination level in the area around the "A" CS pump (P43A) level in the pump area area is < lk DPM/100 cm2 (units of measure)

Minimum lab coats and rubber gloves shall be worn when hoses

4. Minimum required PCs are connected to contaminated systems. Including shoe covers to vent would be acceptable.
5. Expected Dose (units of Expected dose is between 1.2 to 2.5 mrem.

measure)

6. Dose Rate Alarm Setting Dose Rate Alarm is 20 mrem/hr.

(units of measure)s 8

VERIFICATION OF JPM COMPLETION JPMNumber: JPM-A3R Revision: 0 Date Performed:

Student:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

EVALUATION SECTION:

Time Critical Task? D Yes ~No Validated Time (minutes):

I 15 Actual Time to Complete (minutes):

I Work Practice Performance: D SAT D UNSAT Operator Fundamentals: D SAT D UNSAT JPM Question Portion Overall [.NLO only]: D SAT D UNSAT D N/A Attached Question #1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:

Print I Sign Areas for Improvement I Comments:

9

STUDENT HANDOUT (Page 1 of 2)

JPMNumber: JPM-A3R Revision: 0 hritial Conditions:

  • The plant is in MODE I operating at 100% power.
  • Maintenance on the "A" CS pump has been completed.
  • All pump tagging has been removed with the exception of the pump breaker. The pump breaker remains racked down and RED TAGGED.
  • The suction, discharge, recirculation, vent and drain valves are all closed in preparation for filling and venting of the pump.

hritiating Cues:

  • You have been directed to fill and vent the "A" CS pump (P43A). The pump casing vent only needs to be vented and this vent is reached without climbing.
  • Hoses need to be installed for venting.
  • The duration of filling and venting the "A" CS pump (P43A) is expected to take half an hour.
  • All radiological protective action for this work is contained in the RWP.

There are no additional radiological protective action requirements in the Operating procedure for filling and venting the pump.

  • State the radiological requirements for entering this area. Include in your answer:
1. Which RWP task (job step) is appropriate for this assignment.
2. Highest radiation level in the work area around the pump (including units of measure).
3. Highest contamination level in the area of the pump (including units of measure).
4. Protective clothing required to perform venting operations.
5. Expected dose for this assignment area for you only (including units of measure)
6. Dose rate alarm for this area (including units of measure)

The examiner will act as Health Physics (HP) for any related questions.

10

STUDENT HANDOUT (Page 2 of2)

JPMNumber: JPM-A3R Revision: 0

1. RWPTask
2. Highest Radation level in the pump area (units of measure)
3. Highest contamination level in the pump area (units of measure)
4. Minimum required PCs to vent
5. Expected Dose (units of measure)
6. Dose Rate Alarm (units of measure) 11

MILLSTONE NUCLEAR POWER STATION RADIATION SURVEY FIGURE NO. 27 UNIT 2 SURVE(BY

\

--* -*- Survey Type Purpose Rad Material DATE 12/04/16 SIGNATURE *- -** -~*-- -- Labeling &

Radiation Contamination l&i Routine Packaging SAT TIME 1230 PRINT NAME G. Arends l&i Gamma l&i GA D Special IMg INITIALS D Beta D LAS D RWPll

'lo REACTOR __J_

REVIEWED BY IPMIT/S101UOATE) s:r~o (,\)<<!,.!/\ )J ;{I I'(!,\."--

1.2 *7*/(-;,

POWER 100 D Neutron 00 DRP GWA Type Instrument Typel ) Serial Numller 1/Efficiency Bacl1ground Calibration Due Date y Tele 6611-140 N/A N/A 11/17

~+y L-177 84679 10 80 cpm 06/17 a L-2241 I 43-2 234926 I 7496 6.5 O cpm 03/17 03/17 REASON FOR SURVEY: MONTHLY

.,45 ~a~<eg!Ulairco1§~ A<err©l~co1 W©l~~ l©i!l1l~{ l!i IP!Ulm~0> R©©m Sl438

=Nc:f>

~

0.9  ;;;t P42B Smear Results

\!.;:I 3.5

- e NUMBER I DPM/100cm2 0.5 ©1 2 1 -23 <1K

-~51406-'- 2.5 7.5

.4 2.

1 2.6 X23B X23A D @)

@) ~o§O Q ('}

.4

.QJ! .§ O.B b2

~ ~,,

db

@)

0.3 Sl659 Sl460

.QJ!

ALPHA SMEARS 0 NUMBER DPM/100 cm 2 a Resin 3,6,12 <20 Dewatering Panel /f

/

~\~

y

/

Air Sample 0.0 %DAG IX!

8 DRP Survey !Xl With LAS Masslin 0 With Tacky Roller ~

With Microfiber O No DRP Detected !XI 8

Noles: _ _ _ _ _ _ __

DD L16 RAD CONTROLLED AREA RAD MATERIAL AREA CONTAMINATED AREA RADIATION AREA HIGH RAD AREA LOCICEO HIGH RAO AREA VERY HIGH RAO AREA NEUTRON EXPOSURE AREA 1.QQ

  • gamma(y) at waist level in mremlhr 100* "gamma(y) contact in mremlhr 25 N -neutron(0n1) in mremlhr (j)'-DRP survey point (D- contamination survey point §.Q p - beta (/3) reading in mrad/hr 250*110 HS* hot spot reading C) LAS - large area smear

JOB PERFORMANCE MEASURE APPROVAL SHEET JPM

Title:

Emergency Boration JPMNumber: JPM-Sl (JPM-091) Revision: 8/0 Initiated:

Robert L. Cimmino, Jr.(Signature on File) 01/23/2017 Developer Date Reviewed:

Will Chesnutt (Signature on File) 01127/2017 Technical Reviewer Date Approved:

Michael John Cote (Signature on File) 01/26/2017 Supervisor, Nuclear Training Date I

SUMMARY

OF CHANGES A/l&DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format 711 01/09/2017 RLC Copied from JPM-091 and updated to latest procedure and format. 8/0 2

JPM WORKSHEET Facility: MP-2 Examinee:

JPMNumber: JPM-Sl Revision: 8/0 Task

Title:

Emergency Boration System: Reactivity Control Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes): 15 TaskNumber(s): NUTIMS # 000-04-099 Applicable To: SRO - - x- RO

-- x- PEO - - -

KIA Number: KIA Rating: 3.8/3.9

- - -004 -- A2.14 Method of Testing: Simulated Performance: Actual Performance: x Location: Classroom: Simulator: x In-Plant:

Task Standards: At the completion of this JPM the examinee has recognized the failure of two (2)

Control Element Assemblies (CEAs) to insert and has taken action to perform Emergency Boration.

Required Materials: EOP 2525, Standard Post Trip Actions (procedures, equipment, etc.) EOP 2541, Appendix 3, Emergency boration General

References:

EOP 2525, Standard Post Trip Actions EOP 2541, Appendix 3, Emergency boration 3

      • READ TO THE EXAMINEE ***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

JPM WORKSHEET JPMNumber: JPM-Sl Revision: 8/0 Initial Conditions:

  • The plant is at 100% power with all systems and equipment operating normally.

Initiating Cues:

  • You are the RO.
  • Respond to alarms and changing plant conditions on the Primary side.
  • The examiner will act as the US.

Simulator Requirements:

  • Reset the simulator to any 100% power. IC-20 was used in validation.
  • Enter RD0201 and RD0238; CEA #1 and #38 stuck out on trip.
        • NOTES TO TASK PERFORMANCE EVALUATOR****
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

4

PERFORMANCE INFORMATION JPMNumber: JPM-Sl Revision: 8/0 Task

Title:

Emergency Boration STARTTIME: ~~~-

STEP Performance: Standard: Critical: Grade

  1. 1 Report that the Reactor has tripped Examinee observes indications and alarms of a YO N[gj so uo Reactor trip.

Examinee reports the Reactor trip to the Unit Supervisor.

Cue:

  • BOOTH: When the examinee has the watch or directed by the floor, initiate trigger 1, inserting malfunction RP02, spurious Reactor trip.
  • Examiner: When the Examinee reports the Reactor trip, acknowledge and direct the RO to commence EOP 2525, Standard Post Trip Actions and state "going to alarm silence". Pause for a moment while the RO checks C-04 indications, and then (if necessary) ask the RO, "Status of the reactor?" and acknowledge the response.
  • BOOTH: Once the US (Examiner) states "going to alarm silence", place all annunciators in "silence".
  • FLOOR: Once the RO has commenced actions on C-02/3, change the PPC screens to "post-trip".

Comments:

STEP Performance: Standard: Critical: Grade

  1. 2 EOP 2525 YO N[gj so uo Reactivity Control - Reactor Trip When asked about the status of Reactivity Control,
1. ENSURE Reactor trip by ALL of the examinee reports that the Reactor is tripped, the following: two CEAs are stuck out, power is dropping, and Startup Rate is negative.
  • ALL CEAs fully INSERTED .
  • Reactor power is dropping . Examinee states that he/she must perform the
  • SUR is negative . contingency action and commence Emergency Boration per Appendix 3.

Cue:

Comments: Examinee reports to the US are not critical, only that Emergency Boration is commenced.

5

PERFORMANCE INFORMATION JPMNumber: JPM-Sl Revision: 8/0 Task

Title:

Emergency Boration STEP Performance: Standard: Critical: Grade

  1. 3 2525 RESPONSE NOT OBTAINED Examinee goes to RESPONSE NOT OBTAINED YON~ so uo 1.1 PERFORM the following: step 1.1. b commences emergency boration using Appendix 3, "Emergency Boration."
b. IF more than ONE CEA is not fully inserted, THEN USE Appendix Exatninee may use the laminated copy of 3, "Emergency Boration," and Attachment 3-A, which starts with JPM Step #5, COMMENCE emergency boration.

or reference BOP 2541, Appendix 3 (JPM Step #4).

Cue:

Comments: RESPONSE NOT OBTAINED step 1.1.a, IF Reactor trip breakers are CLOSED, THEN INSERT CEAs by ANY of the following methods. This step is not applicable since the Reactor trip breakers are OPEN.

STEP Performance: Standard: Critical: Grade

  1. 4 BOP 2541, Appendix 3 Examinee goes to Attachment 3-A, "Commencing YON~ so uo
1. IF emergency boration is desired, Emergency Boration." And commences emergency PERFORM Attachment 3-A, boration.

"Commencing Emergency Boration."

Cue:

Comments:

6

PERFORMANCE INFORMATION JPMNumber: JPM-Sl Revision: 8/0 Task

Title:

Emergency Boration STEP Performance: Standard: Critical: Grade

  1. 5 EOP 2541, Appendix 3, Attachment 3A Examinee observes level in both Boric Acid YON~ so uo Storage Tanks are >75% and detennines that both
1. IF boric acid storage tanks are tanks are available.

available, INITIATE emergency boration as follows:

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 6 a. ENSURE CH-512, VCT makeup Exarninee ensures CH-512, VCT Makeup Valve, YON~ so uo valve stop is closed. (on C-04) is closed by observing the green (closed) light is lit and the red (open) light is NOT lit.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 7 b. ENSURE CH-196, VCT makeup Exarninee ensures CH-196, VCT Makeup Bypass YON~ so uo bypass is closed. Valve, (on C-02) is closed by observing the green (closed) light is lit and the red (open) light is NOT lit.

Cue:

Comments:

7

PERFORMANCE INFORMATION JPMNumber: JPM-Sl Revision: 8/0 Task

Title:

Emergency Boration STEP Performance: Standard: Critical: Grade

  1. 8 c. OPEN CH-514, boric acid Examinee opens 2-CH-514, boric acid isolation, by Yi:8] NO so uo isolation. momentarily holding the handswitch in the "OPEN" position and observing the associated red light is lit and the green light is NOT lit (on C-02).

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 9 d. START BOTH boric acid
  • Examinee starts both "A" and "B" Boric Acid Yi:8] NO so uo pumps. Pumps by momentarily placing the respective handswitches to "START".
  • Examinee observes the associated red light is lit and the green light is NOT lit.

Cue:

Comments: The only Critical part of this step is to start both boric acid pumps.

STEP Performance: Standard: Critical: Grade

  1. 10 e. CLOSE BOTH boric acid pump Examinee takes 2-CH-510 and 2-CH-511 switches YO Ni:8] so uo recirc valves: to the "CLOSE" position.
  • CH-510 Examinee observes both valves are closed by
  • CH-511 observing the green (closed) lights are lit and the red (open) lights are NOT lit.

Cue:

Comments: The step is not critical because boric acid iajection will still occur with these valves full open.

8

PERFORMANCE INFORMATION JPMNumber: JPM-Sl Revision: 8/0 Task

Title:

Emergency Boration STEP Performance: Standard: Critical: Grade

  1. 11 f. OPEN BOTH boric acid gravity Examinee takes CH-508 and CH-509 handswitches y[;g] NO so uo feed isolations: to the "OPEN" position.
  • CH-508 Exarninee observes both valves are go open and the
  • CH-509 associated red lights are lit and the green lights are NOT lit (on C-02).

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 12 g. CLOSE CH-501, VCT outlet Examinee closes CH-501, VCT outlet isolation, by y[;g] NO so uo isolation. holding the handswitch in the "CLOSE" position until the associated red light is NOT lit and the green light is lit (on C-02).

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 13 h. ENSURE BOTH of the following Examinee observes both valves are closed by YO N[;g] so uo are closed: observing the green (closed) lights are lit and the
  • CH-192, RWST isolation red (open) lights are NOT lit (on C-02).

Cue:

Comments:

9

PERFORMANCE INFORMATION JPMNumber: JPM-Sl Revision: 8/0 Task

Title:

Emergency Boration STEP Performance: Standard: Critical: Grade

  1. 14 i. IF CH-500, letdown divert Examinee observes CH-500, Letdown Divert YON~ so uo handswitch is in the "VCT" handswitch position and places it in "RWS" as position, PLACE the valve to the necessary.

"RWS" position.

Cue:

Comments: This step has no relevance to the success of the task.

STEP Performance: Standard: Critical: Grade

  1. 15 j. ENSURE at least one charging Examinee determines the "A" and "C" Charging YON~ so uo pump is operating. Pumps are operating by observing the associated red light is lit and the green light is NOT lit.

Cue:

Comments: Examinee may start the "B" charging pump, though this is not required for this JPM.

STEP Performance: Standard: Critical: Grade

  1. 16 k. CHECK charging flow is greater Examinee observes Charging flow is greater than YON~ so uo than40 gpm. 40 gpm and reports indication to the US.

Cue: Acknowledge the report or, if necessary, ask the RO for a status.

Comments: Establishing>/= 40 gpm charging flow with a suction source of the BAST completes the JPM.

TERMINATION CUE: The evaluation for this JPM is concluded.

STOP TIME: - - -

10

VERIFICATION OF JPM COMPLETION JPMNumber: JPM-Sl Revision: 8/0 Date Performed:

Student:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

As necessary, refer to TIG-04 for additional Pass/Fail criteria.

EVALUATION SECTION:

Time Critical Task? D Yes [:gj No Validated Time (minutes): 15 min Actual Time to Complete (minutes):

I I Work Practice Performance: D SAT D UNSAT Operator Fundamentals: D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question #1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:

Print I Sign Areas for Improvement I Comments:

11

STUDENT HANDOUT JPMNumber: JPM-Sl Revision: 8/0 Initial Conditions:

  • The plant is at 100% power with all systems and equipment operating normally.

Initiating Cues:

  • You are the RO.
  • Respond to alarms and changing plant conditions on the Primary side.
  • The examiner will act as the US.

12

\

JOB PERFORMANCE MEASURE APPROVAL SHEET JPM

Title:

Verify SI Flow IAW EOP 2532, LOCA JPMNumber: JPM-S2 Revision: 010 Initiated:

Robert L. Cimmino, Jr. (Signature on File) 01/30/2017 Developer Date Reviewed:

Will Chesnutt (Signature on File) 01/31/2017 Technical Reviewer Date Approved:

Michael John Cote (Signature on File) 02/01/2017 Supervisor, Nuclear Training Date I

SUMMARY

OF CHANGES DATE DESCRIPTION REV/CHANGE 01/17/17 rlc Create JPM for NRC 2017 Re-Take 010 2

JPM WORKSHEET Facility: MPUnit2 Examinee:

JPMNumber: Revision:

JPM-S2 - -0/0- -

Task

Title:

Verify SI Flow IAW EOP 2532, LOCA System: LPSI Time Critical Task: DYES [3J NO Validated Time (minutes): - - - -

Task Number(s): 000-05-222 Applicable To: SRO

--- STA - - - - RO x PEO KIA Rating:

KIA Number: 006/A3.03 - - -4.1/4.1 Method of Testing: Simulated Performance: Actual Performance: x Location: Classroom: Simulator: x In-Plant:

Task Standards: At the completion of this JPM, the examinee has recognized SI flow is not adequate and has taken action to open Facility 2 LPSI injection valves that had failed to open on the already triggered SIAS signal.

Required Materials: EOP 2532, LOCA, Step 4 through Step 6.

(procedures, equipment, etc.) EOP 2541, Appendix 2, Figure 3 - "Pre-SRAS Minimum Required SI Flow" General

References:

EOP 2532, Loss Of Coolant Accident

      • READ TO THE EXAMINEE ***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

3

JPM WORKSHEET JPMNumber: JPM-S2 Revision: 0/0 Initial Conditions: 1. Plant tripped on EHC malfunction, the crew completed EOP 2525, Standard Post Trip Actions.

2. Immediately after transitioning to EOP 2526, Reactor Trip Recovery, 24C de-energized due to a bus fault and a Large Break LOCA occurred.
3. The crew then transitioned to EOP 2532, Loss of Coolant Accident.
4. All steps in EOP 2532, LOCA have been completed through step 3.
5. Based on a loss ofRCP NPSH, all the RCPs are secured and TIC-4165 is in Manual-Closed.

Initiating Cues: 1. You are the Reactor Operator (RO).

2. The Unit Supervisor has directed you to perform steps 4, 5 and 6 ofEOP 2532, Loss Of Coolant Accident.

Simulator Requirements: 1. Reset Simulator to any power IC, [IC-140 presently set up] ensure CRACS is operating on Z-1.

2. Trip the plant and perform EOP 2525, immediate actions only.
3. Initiate a loss of 24C (ED05C) an trip the "A" EDG.
4. Then initiate a LOCA using RC02A @ 4000#/s, no ramp.
5. Acknowledge all alarms, ensure alarms are not silenced, and wait for RCS pressure to lower enough to allow LPSI flow.
6. When LPSI has been injecting for about 10 minutes, then override closed both of the Facility 2 LPSI injection valves.
7. Ensure SI flow curve is displayed on booth PPC monitor and be ready to print the screen if requested by the NRC examiner.
8. FREEZE the simulator until the exarninee takes the watch.
        • NOTES TO TASK PERFORMANCE EVALUATOR****
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance ofthis JPM (in-plant only).

4

PERFORMANCE INFORMATION JPM Number: JPM-S2 Revision: 0/0 Task

Title:

Verify SI Flow IAW EOP 2532, LOCA START TIME: - - - -

STEP Performance: Standard: Critical: Grade

  1. 1 EOP 2532, LOCA YD N[gj so uo Check SIAS Actuation
4. IF pressurizer pressure is less than 1714 Examinee refers to Step 4 of EOP 2532 and notes psia, PERFORM ALL of the following: that SIAS, CIAS and EBF AS have actuated.
a. ENSURE SIAS, CIAS and EBF AS have actuated. (CO 1)

Cue:

BOOTH: When the examinee is ready to take the watch, place the simulator in RUN.

Comments:

Exarninee may note LPSI injection valves, SI-635 and SI-645, have not opened and either open them or recommend they be opened.

Concur and direct.

STEP Performance: Standard: Critical: Grade

  1. 2 Check SIAS Actuation YD N[gj so uo
b. ENSURE ONE complete facility of Exarninee notes Facility 1 CRACS in not operating CRACS is operating in the recirc due to loss of power (and Fae. 1 section is N/A).

mode: (C25)

Facility 1 Cue:

Comments:

5

PERFORMANCE INFORMATION JPM Number: _JP=-=-=M=-=-S=-=2~--------------- Revision: 0/0 Task

Title:

Verify SI Flow IAW EOP 2532, LOCA STEP Performance: Standard: Critical: Grade

  1. 3 4. Check SIAS Actuation (cont) YO N[gj so uo
b. ENSURE ONE complete facility of CRACS is operating in the recirc mode: (C25)

Facility 2 Examinee verifies Facility 2 CRACS is operating

  • HV-203B, Fan F-21B exhaust in recirc mode by performing the following:

damper is open.

  • Fan F-21B, supply fan is running .
  • Starts F-21B supply fan
  • HV-206B, Fan F-31B exhaust

damper is open.

  • Starts F-31B, exhaust fan .
  • Fan F-3 lB, exhaust fan is running .
  • HV-212B, Fan F-32B exhaust
  • Notes HV-212B is open.

damper is open.

  • Notes F-32B is running.
  • Fan F-32B, filter fan is running .
  • Notes HV-495, fresh air damper is closed.
  • HV-495, fresh air damper is closed .
  • Notes HV-496, exhaust air damper is closed .
  • Notes HV-497, cable vault exhaust damper is closed. closed.
  • HV-497, cable vault exhaust damper is closed.

Cue:

Comments:

6

PERFORMANCE INFORMATION JPMNumber: JPM-82 Revision: 0/0 Task

Title:

Verify SI Flow IAW EOP 2532, LOCA STEP Performance: Optimize Safety Injection Standard: Critical: Grade

  1. 4 5. IF SIAS has initiated, PERFORM the a. Examinee checks COlX Facility 2 indication of YON~ so uo following: SIAS, CIAS and EBFAS. lfnot previously
a. CHECK at least one train of SIAS, CIAS opened, notes SI-635 and SI-645 are closed.

and EBFAS has properly actuated. b. Examinee checks for adequate SI flow on the (COlX) PPC or compares total indicated flow on CO 1

b. CHECK that safety injection flow is to required flow per EOP 2541, Appendix 2 adequate. Refer To Appendix 2, Figure 3, "Pre-SRAS Minimum Required SI "Figures." Flow".

Cue:

Comments:

STEP Performance: Optimize Safety Injection Standard: Critical: Grade

  1. 5 CONTINGENCY ACTIONS a.1 Examinee notes two LPSI iajection valves Y~NO so uo a.l IF ANY component is not in its required (SI-635 and SI-645) are indicating not in their position, manually ALIGN the applicable accident position (blue light off - C-OlX or component. Green light lit, red light off - C-01 ).

Examinee then uses C-01 control switches to b.1 PERFORM ANY of the following to restore open SI-635 and SI-645 (red lights are lit and safety injection flow within the SI Flow the green lights* are off for both valves).

Curve:

b.l If LPSI SI valves were not opened in the

1) ENSURE electrical power to safety previous step, examinee performs step b.1 injection pumps and valves.
2) ENSURE correct safety injection valve 1) Examinee notes SI pumps and valves have adequate electrical power.

lineup.

2) Examinee notes two LPSI injection valves are closed and opens injection valves until adequate SI flow is achieved (App. 2).

Cue: Once LPSI injection valves are opened enough to satisfy EOP 2541Appendix2 Figure 3, the JPM is complete.

Comments: Opening the LPSI injection valves enough to meet SI flow IAW App. 2 figure in either step "a. l" or "b.1" is acceptable.

Satisfactory completion of this step requires LPSI injection flow indication on C-01 or the PPC meet Figure 3 of Appendix 2.

TERMINATION CUE: The evaluation for this JPM is concluded.

STOP TIME: - - -

7

VERIFICATION OF JPM COMPLETION JPMNumber: JPM-S2 Revision: 0/0 Date Performed:

Student:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

EVALUATION SECTION:

Time Critical Task? D Yes ~No Validated Time (minutes): 12 Actual Time to Complete (minutes):

I I Work Practice Performance: D SAT D UNSAT Operator Fundamentals: D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question #1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:

Print I Sign Areas for Improvement I Comments:

8

STUDENT HANDOUT JPMNumber: JPM-S2 Revision: 0/0 Initial Conditions: 1. Plant tripped on EHC malfunction, the crew completed EOP 2525, Standard Post Trip Actions.

2. After transitioning to EOP 2526, Reactor Trip Recovery, 24C de-energized due to a bus fault and a Large Break LOCA occurred.
3. The crew then transitioned to EOP 2532, Loss of Coolant Accident.
4. All steps in EOP 2532, LOCA have been completed through step 3.
5. Based on a loss ofRCP NPSH, all the RCPs are secured and TIC-4165 is in Manual-Closed.

Initiating Cues: 1. You are the Reactor Operator (RO).

2. The Unit Supervisor has directed you to perform steps 4, 5 and 6 of EOP 2532, Loss Of Coolant Accident.

9

JOB PERFORMANCE MEASURE APPROVAL SHEET JPM

Title:

Forcing Pressurizer Sprays JPMNumber: JPM-S3 Revision: 0/0 Initiated:

Robert L. Cimmino, Jr. (Signature on File) 01/26/2017 Developer Date Reviewed:

Will Chesnutt (Signature on File) 01/27/2017 Technical Reviewer Date Approved:

Michael John Cote (Signature on File) 02/1/2017 Supervisor, Nuclear Training Date 1

SUMMARY

OF CHANGES DATE DESCRIPTION REV/CHANGE 01/06/17 RLC Copied from JPM 223 and revised as JPM-S3 for 2017 NRC 010 Re-Take Exam, modified malfunction from controller output failure to controller input failure (PT-1 OOY).

2

JPM WORKSHEET Facility: MP Unit2 Exarninee:

Revision:

JPMNumber: JPM-S3 - 0/0 Task

Title:

Forcing Pressurizer Sprays System: Pressurizer Pressure Control System Time Critical Task: DYES ~NO Validated Time (minutes):

Task Number(s): 010-02-002 Applicable To: SRO x STA RO x PEO KIA Number: 010/K6.03 KIA Rating: - - -3.2/3.6 Method of Testing: Simulated Performance: Actual Performance: x Location: Classroom: Simulator: x In-Plant:

Task Standards: At the completion of this JPM, the examinee has attempted to Force Pressurizer Sprays and has taken action to prevent a Reactor trip due to a controller malfunction.

Simulator

  • Initialize to a 100% power IC that will allow Forcing Pressurizer Sprays.

Requirements:

  • Ensure Channel "Y" is selected for pressure control.
  • CAUTION tag Ch. "X" PIC-lOOX OOS. Place tag on Channel Selector Switch and over controller PIC-1 OOX.
  • Insert malfunction RX03B, PT-1 OOY Pressure Transmitter failure, at 2348 psia, ramp = 1 min. when exarninee lowers selected pressure controller setpoint.

General

References:

  • OP 2204, Load Changes, Attachment 10, Forcing Pressurizer Sprays
  • ARP 2590B-212, D-37 on C-0213, PZR Pressure Selected Channel Deviation Hi/Lo
  • ARP 2590B-216, D-38 on C-0213, Pressurizer Ch X Pres Hi/Lo
  • ARP 2590B-220, D-39 on C-02/3, Pressurizer Ch Y Pres Hi/Lo
  • AOP 2585, Immediate Operator Actions
      • READ TO THE EXAMINEE ***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

3

JPM WORKSHEET JPMNumber: JPM-S3 Revision: 0/0 Initial Conditions:

  • A down-power to 90% is being initiated using OP 2204, Load Changes.
  • All equipment is operating normally.
  • Channel "X" Pressure controller, PIC-1 OOX, is Out-Of-Service while l&C investigates an erratic control issue.

Initiating Cues: You are the Reactor Operator (RO) and have been directed to initiate forcing Pressurizer Sprays in accordance with OP 2204, Load Changes, Attachment 10, Forcing Pressurizer Sprays.

Required Materials:

  • OP 2204, Load Changes, Attachment 10, Forcing Pressurizer (procedures, equipment, Sprays etc.)
  • ARP 2590B-212, D-37 on C-02/3, PZR Pressure Selected Channel Deviation Hi/Lo
  • ARP 2590B-216, D-38 on C-02/3, Pressurizer Ch X Pres Hi/Lo
  • ARP 2590B-220, D-39 on C-02/3, Pressurizer Ch Y Pres Hi/Lo
  • AOP 2585, Immediate Operator Actions
        • NOTES TO TASK PERFORMANCE EVALUATOR****
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

4

PERFORMANCE INFORMATION JPM Number: JPM-83

_c..:::_::_:__~~~~~~~~~~~~~~~~

Revision: 0/0 Task

Title:

Forcing_Pre_ssurizer Sprays START TIME: - - - -

STEP Performance: Standard: Critical: Grade

  1. 1 OP 2204, Attachment 10 Examinee reads and acknowledges the Note. YON~ so uo NOTE:
1. Annunciator C-02 window D-37, "PRESSURIZER SELECTED CHANNEL DEVIATION HI/LO," is expected during performance of this evolution.
2. The potential effects of forcing pressurizer spray, due to the pressure coefficient of reactivity, need to be identified to ensure margin exists for thermal power limits.

Cue:

Provide OP 2204, Load Changes, Attachment 10, Forcing Pressurizer Sprays, to the examinee.

Comments:

STEP Performance: Standard: Critical: Grade

  1. 2 OP 2204, Attachment 10 Examinee recognizes that the Pressurizer Pressure YON~ so uo Channel Selector Switch is NOT in the "X"
1. IF using PIC-IOOX, "PRESS CNTL-X," to position, marks step I as NA, and proceeds to step force sprays, PERFORM the following: 2.

Cue:

Comments:

5

PERFORMANCE INFORMATION JPM Number: JPM-S3 Revision: 0/0 Task

Title:

Forcing Pressurizer Sprays STEP Performance: Standard: Critical: Grade

  1. 3 2. IF using PIC-lOOY, "PRESS CNTL-Y," to PIC-lOOY has been verified in service in previous Y0N0 so uo force sprays, PERFORM the following: step. Examinee continues with step 2 Cue:

Comments: If requested, provide examinee with a copy of ARP 2590B-212, PZR. PRESSURE SELECTED CHANNEL DEVIATION, D-37 on C-02/3.

STEP Performance: Standard: Critical: Grade

  1. 4 2.1 To initiate forcing sprays, PERFORM the Examinee continues with step 2. Y0N0 so uo following:

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 5 2.1.1 RECORD one of the following from PIC- Examinee observes either the PIC-1 OOY Controller Y0N0 so uo lOOY, "PRESS CNTL-Y" (C-03): setpoint (Black and white arrow) on C-03 or the
  • Controller setpoint (black and white PIC-lOOY Controller output signal on C-03 and arrow) records>/= 1 of these values on Attachment 10.
  • Controller output signal Cue:

Examinee may record both values on Attachment 10.

Comments:

STEP Performance: Standard: Critical: Grade

  1. 6 2.1.2 RECORD pressurizer pressure. (PPC or Examinee observes Pressurizer pressure from the Y0N0 so uo C-03) PPC or on C-03 and records the value on Attachment 10.

Cue:

Comments:

6

PERFORMANCE INFORMATION JPM Number: JPM-S3

~=-=-=-=-~~~~~~~~~~~~~~~~

Revision: 0/0 Task

Title:

Forcing Pressurizer Sprays STEP Performance: Standard: Critical: Grade

  1. 7 2.1.3 PLACE all available pressurizer
  • Examinee locates all 4 Backup Heater "BACKUP HTRS" group handswitches handswitches on C-03 and momentarily places Y~NO so uo to "CLOSE" (C-03). each of them in the "CLOSE" position, observing red lights lit for each group.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 8 2.1.4 Slowly LOWER PIC-lOOY, "PRESS
  • Examinee locates the thumbwheel for Pressure CNTL-Y," to obtain both of the Controller, PIC-lOOY, and rotates it in the Y~NO so uo following: downward direction to obtain a 40-50% output on the controller horizontal scale.
  • Pressurizer controller output signal
  • Examinee observes that the red pointer and the 40%to 50% black and white pointer on the vertical scales YON~ so uo
  • The following controllers output of both Spray Valve Controllers, HIC-lOOE signal start to rise: and lOOF, are rising.

0 HIC-lOOE, "PZR SPRAY-IA"

  • Examinee observes and acknowledges YON~ so uo 0 HIC-lOOF, "PZR SPRAY-lB" annunciator D-37, PZR. PRESSURE SELECTED CHANNEL DEVIATION HI/LO alarm and reports that this is an expected alarm for Forcing Sprays.

Cue:

BOOTH: When annunciator D-37 alarms on C-02/3 (PZR PRESSURE SELECTED CHANNEL DEVIATION), insert malfunction RX03B at 2348 psia with a 1 minute ramp.

Comments: If requested, provide examinee with a copy of ARP 2590B-212, PZR PRESSURE SELECTED CHANNEL DEVIATION HI/LO, D-37 on C-02/3.

7

PERFORMANCE INFORMATION JPM Number: JPM-S3 Revision: 0/0 Task

Title:

Forcing Pressurizer Sprays STEP Performance: Standard: Critical: Grade

  1. 9 2.2 ADJUST PIC-lOOY, "PRESS CNTL-Y" (C-03), as necessary to maintain pressurizer While adjusting PIC-1 OOY setpoint, Examinee YON~ so uo observes PZR pressure and PZR Spray valves pressure recorded in step 2.1.2. continuing to OPEN.

Cue:

  • If requested, provide examinee with ARP-2590B-220, PRESSURIZER CHY PRES HI/LO, D-39 on C-02/3 .

Comments:

Examinee may not ask for the ARP if Immediate Operator Actions are taken to mitigate the lowering pressure. If ARPs are used to mitigate the event, skip to JPM Step 14 (for alarm D-37) or Step 20 (for alarm D-38/39), depending on the ARP utilized.

STEP Performance: Standard: Critical: Grade

  1. 10 AOP 2585 Immediate Operator Actions Note: AOP 2585 actions contained in steps 10.1 - YON~ so uo Examinee performs Section 10, Pressurizer 10.4 are required to be performed from memory.

Spray Valve Open:

[10.l] OBSERVE Pressurizer pressure safety Examinee observes the four Safety Channels of channel indications to evaluate RCS pressure. pressurizer pressure and notes they are lowering.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 11 [10.2] IF Pressurizer pressure less than 2260 psig, manually CLOSE affected spray Examinee verifies PZR pressure < 2260 psia, then places BOTH Spray Valve controllers, Y~NO so uo valve(s): HIC-1 OOE/F in "M" and manually closes the 0 HIC 1OOE, PZR SPRAY- 1A affected spray valves on C-03.

0 HIC lOOF, PZR SPRAY- lB Cue:

Comments: This step is not critical if the examinee elects to utilize the ARPs to mitigate the event.

Examinee may also note RCS pressure has dropped below the Tech. Spec. DNB Limit of 2225 psia. This note is not Critical as it is a momentary issue and the Examinee is required to focus on mitigating the problem.

8

PERFORMANCE INFORMATION JPM Number: ~J:..::P~M--"-S'-'-3_ _ _ _ _ _ _ _ _ _ _ _ _ _ __ Revision: 0/0 Task

Title:

Forcing Pressurizer Sprays STEP Performance: Standard: Critical: Grade

  1. 12 [10.3] CHECK affected Pressurizer Spray Examinee Verifies BOTH spray valves are closed YO Ni:gj so uo Valve(s) are closed: (red lights off, green lights lit on C-03);

0 HIC 1OOE, PZR SPRAY- I A 0 HIC I OOE, PZR SPRAY- I A 0 HIC I OOF, PZR SPRAY- I B 0 HIC I OOF, PZR SPRAY- I B Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 13 [10.4] START backup heaters as needed. Examinee notes all backup heaters are already on. YO Ni:gj so uo Cue:

Comments: Once both spray valves are closed, the JPM is complete.

STEP Performance: Standard: Critical: Grade

  1. 14 ARP 2590B-212 {C02/3; D-37}, Examinee notes this is an expected alarm, but may YO Ni:gj so uo "PZR PRESSURE SELECTED CHANNEL reference the applicable ARP for guidance.

DEVIATION HI/LO" AUTOMATIC FUNCTIONS I. For High alarm, proportional heaters are at Examinee reads and acknowledges the Automatic minimum output Functions.

2. For Low alarm, proportional heaters are at maximum output Cue:

Comments: Steps 14 - 24 are included in case the examinee utilizes the ARPs to mitigate the event. Any critical steps listed in this set are only applicable if the spray valves have not yet been manually closed.

9

PERFORMANCE INFORMATION JPM Number: ......:JP::..=....::M.:..:::_::-S:::3:____ _ _ _ _ _ _ _ _ _ _ _ _ __ Revision: 0/0 Task

Title:

Forcing Pressurizer Sprays STEP Performance: Standard: Critical: Grade

  1. 15 CORRECTIVE ACTIONS YON~ so uo NOTE; This is an expected alarm when Examinee acknowledges the Note.

forcing pressurizer sprays, or testing heater capacity.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 16 1. OBSERVE the following to evaluate RCS Examinee observes RCS pressure indication and YON~ so uo pressure: notes pressure is lowering on Channel "X" and the Safety Channels.
  • PRES CNTL-X, PIC-lOOX
  • PRES CNTL-Y, PIC-lOOY
  • Pressurizer pressure safety channel indication Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 17 2. IF channel check indicates the controlling Examinee may note the controlling channel is YON~ so uo channel of pressurizer pressure has malfunctioning, but also notes Ch. "X" is malfunctioned, AND the opposite channel is unavailable does NOT transfer control to Ch. "X".

operating properly, PERFORM the following (C-03):

Cue: If examinee suggests transferring to Channel "X" (it appears operational), as the US, state the status of Channel "X" is unknown and direct the exarninee to remain in Channel "Y" and continue with required actions.

Comments:

10

PERFORMANCE INFORMATION JPM Number: _:J:=. : P:. .:M=.. :-S:. .: 3_ _ _ _ _ _ _ _ _ _ _ _ _ _ __ Revision: 0/0 Task

Title:

Forcing Pressurizer Sprays STEP Performance: Standard: Critical: Grade

  1. 18 3. IF channel check indicates the controlling Examinee may attempt to raise the selected channel YD N[gj so uo channel of pressurizer pressure is operating setpoint to mitigate the failure, but should soon properly, ENSURE selected channel setpoint recognize this action is not succeeding.

is adjusted to desired pressurizer pressure (C-03).

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 19 4. IF heaters and spray are not operating Examinee should take manual control of both spray y[g] ND so uo properly, PERFORM the following: valves and close them, or take manual control of 4.1 Manually OPERATE pressurizer heaters PIC-1 OOY and lower its output to close both spray valves (green lights lit, red lights off on C-03).

and spray to establish desired RCS pressure.

Cue:

Comments: This step is required only if spray valves have not yet been manually closed.

Once both spray valves are closed, the JPM is complete.

STEP Performance: Standard: Critical: Grade

  1. 20 ARP 2590B-216[220] {C02/3; D-38[39]}, Examinee notes this alarm and references the YD N[gj so uo "PRESSURIZER CH X[Y] PRES HI/LO" applicable ARP for guidance.

AUTOMATIC FUNCTIONS

1. IF high pressure alarm, backup heater breakers trip.

Cue:

Comments: Either Ch. "X" (2590-216) or Ch. "Y" (2590B-220) Hi/Lo alarms may be referenced due to duplicate actions.

11

PERFORMANCE INFORMATION JPM Number: JPM-S3 Revision: 0/0 Task

Title:

Forcing Pressurizer Sprays STEP Performance: Standard: Critical: Grade

  1. 21 CORRECTIVE ACTIONS YD NIZJ so uo
1. OBSERVE (CHECK) "PRESSURIZER Examinee observes various pressure indications PRESS, PR-100," pressurizer pressure and notes RCS pressure is lowering.

controllers, and pressurizer pressure safety channels (C-03), and PPC indications of applicable RCS pressure.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 22 2. IF channel check indicates that channel "X" Examinee notes Ch. "X" is unavailable and not the YIZJ ND so uo

("Y") is the controlling channel and has controlling channel (step is N/A) malfunctioned, AND channel "Y" ("X") is operating properly, PERFORM the following (C-03):

Cue:

Comments: Not attempting to transfer control to Ch. "X" is the only critical part to this step.

STEP Performance: Standard: Critical: Grade

  1. 23 3. IF pressure is high, VERIFY the following: Examinee notes pressure is low, that the step is YD NIZJ so uo 3.1 All heaters are de-energized. NIA and takes no action.

3.2 "SPRAY VLVS, RC-lOOE and RC-lOOF" are fully open (C-03).

Cue:

Comments: This step is only critical if this action is taken and not corrected before the plant trips on low pressure.

12

PERFORMANCE INFORMATION JPM Number: . . : J:=. : P:. .:M.:.: . . :-S:. .:3_ _ _ _ _ _ _ _ _ _ _ _ _ _ __ Revision: 0/0 Task

Title:

Forcing Pressurizer Sprays STEP Performance: Standard: Critical: Grade

  1. 24 4. IF pressure is low, VERIFY the following: Examinee verifies all backup heaters are energized Y[8J ND so uo 4.1 All heaters are energized. and takes manual control of both spray valves and 4.2 "SPRAY VL VS, RC- IOOE and closes both valves (green lights lit, red lights off on C-03).

RC- IOOF" are fully closed (C-03).

Examinee may also place PIC-1 OOY in "M" and manually drive the output low, which would also close both spray valves if their controllers are still in automatic mode ("A").

Cue:

Comments: This step is required only if spray valves have not yet been manually closed.

Once both spray valves are closed, the JPM is complete.

TERMINATION CUE: The evaluation for this JPM is concluded.

STOP TIME: _ __

13

VERIFICATION OF JPM COMPLETION JPMNumber: JPM-S3 Revision: 0/0 Date Performed:

Student:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

EVALUATION SECTION:

Time Critical Task? 0 Yes 0 No Validated Time (minutes): 15 Actual Time to Complete (minutes):

I I Work Practice Performance: 0 SAT 0 UNSAT Operator Fundamentals: 0 SAT 0 UNSAT JPM Question Portion Overall [NLO only]: 0 SAT 0 UNSAT 0 N/A Attached Question #I 0 SAT 0 UNSAT Attached Question #2 0 SAT 0 UNSAT Overall Result of JPM: 0 SAT 0 UNSAT Evaluator:

Print I Sign Areas for Improvement I Comments:

14

STUDENT HANDOUT JPMNumber: JPM-S3 Revision: 0/0 Initial Conditions:

  • A down-power to 90% is being initiated using OP 2204, Load Changes.
  • All equipment is operating normally.
  • Channel "X" Pressure controller, PIC-IOOX, is Out-Of-Service while I&C investigates an erratic control issue.

Initiating Cues: You are the Reactor Operator (RO) and have been directed to initiate forcing Pressurizer Sprays in accordance with OP 2204, Load Changes, Attachment 10, Forcing Pressurizer Sprays.

15

JOB PERFORMANCE MEASURE APPROVAL SHEET JPM

Title:

Operate the TDAFP using BOP 2541, Appendix 6 (Alt. Path)

JPMNumber: JPM-S4 Revision: 0/0 Initiated:

Robert L. Cimmino, Jr. (Signature on File) 01/23/2017 Developer Date Reviewed:

Will Chesnutt (Signature on File) 01/27/2017 Technical Reviewer Date Approved:

Michael John Cote (Signature on File) 01126/2017 Supervisor, Nuclear Training Date 1

SUMMARY

OF CHANGES DATE DESCRIPTION REV/CHANGE 01/18/17 rlc Created JPM for 2017 NRC Re-Take Exam 010 2

JPM WORKSHEET Facility: MPUnit2 Examinee:

JPMNumber: JPM-S4 Revision:

- -0/0 Task

Title:

Operate the TDAFP using EOP 2541, Appendix 6 (Alt. Path)

System: Auxiliary Feed Water Time Critical Task: DYES ~NO Validated Time (minutes):

Task Number(s): 061-01-076 Applicable To: SRO x STA RO

-X- - PEO KIA Number: 061/A2.04 KIA Rating:

- - -3.4/3.8 Method of Testing: Simulated Performance: Actual Performance: x Location: Classroom: Simulator: x In-Plant:

Task Standards: The examinee will utilize EOP 2541, Appendix 6 to start up the TDAFP, place it in service feeding both SGs, then respond to a trip of the pump and return it to service feeding both SGs.

Required Materials: 1. EOP 2541, Appendix 6, "TDAFW Pump Normal Startup" (procedures, equipment, etc.)

2. EOP 2541, Appendix 7, "TDAFW Pump Abnormal Startup."

General

References:

EOP 2541, Appendix 6, "TDAFW Pump Normal Startup"

      • READ TO THE EXAMINEE ***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

3

JPM WORKSHEET JPMNumber: JPM-S4 Revision: 0/0 Initial Conditions: 1. The plant tripped from 100% power due to a loss of condenser vacuum.

2. All plant systems and components responded as designed on the trip.
3. EOP 2525, "Standard Post Trip Actions", were in progress when the "B" AFW pump tripped on overload.

Initiating Cues: 1. You are the Balance Of Plant (BOP) operator.

2. As the BOP, complete step 7a. RNO actions to place the TDAFW pump in service.

Simulator Requirements: Initialize the simulator to the following conditions:

1. Mode 3 with a plant trip due to loss of condenser vacuum (FW01/FW33).
2. Place alarms in "silence" and perform all EOP 2525 Immediate Actions, including setting up AFW to feed both SGs using the two electric pumps.
3. Trip the "B" AFW pump (FW20B) but do not start the TDAFP.
4. FREEZE the simulator until examinee is ready to take the watch.
5. Set up the following IO/Malfunctions to simulate TDAFP overspeed trip:
a. BT-29; IO FWSI-4194A to 4500 rpm, no Ramp, auto Delete in 1 sec.
b. BT-29; FW20C, no Ramp, no auto Delete.
6. Be prepared to delete FW20C when the examinee directs a PEO to locally reset the overspeed trip.
        • NOTES TO TASK PERFORMANCE EVALUATOR****
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance ofthis JPM (in-plant only).

4

PERFORMANCE INFORMATION JPM Number: JPM-S4

__::_:=-=-.::;,__:_::__~~~~~~~~~~~~~~~

Revision: 0/0 Task

Title:

Operate the TDAFP using EOP 2541, Appendix 6 (Alt. Path)

STARTTIME: ~~~-

STEP Performance: Standard: Critical: Grade

  1. 1 EOP 2525 2 Standard Post Tri(! Actions YON~ so uo RESPONSE NOT OBTAINED a.1 RESTORE level to between 40% to 70% in Examinee notes the RNO action and refers to at least ONE steam generator using ANY of Appendix 6, "TDAFW Pump Normal Startup".

the following:

  • TDAFW Pump. Refer To Appendix 6, "TDAFW Pump Normal Startup."
  • TDAFW Pump. Refer To Appendix 7, "TDAFW Pump Abnormal Startup."

Cue:

Comments: Appendix 7 may also be used as it contains all the necessary steps of Appendix 6. However, Appendix 7 contains several steps that are beyond the scope of the given event that would be considered "NIA".

STEP Performance: Standard: Critical: Grade

  1. 2 EOP 2541 2 A(!(!endix 62 TDAFWPuml! YON~ so uo Normal Startul!
1. IF a SBO event has occurred OR DC Bus Exarninee recognizes a Station Blackout event has 201B is not energized, Go To Appendix not occurred and the step is NIA.

7, "TDAFW Pump Abnormal Operation" Cue:

Comments:

5

PERFORMANCE INFORMATION JPM Number: ....:JP::..:::....:M.:..::.....:-S:....:4~--------------- Revision: 0/0 Task

Title:

O~rate the TDAFP using EOP 2541, Appendix 6 (Alt. Path)

STEP Performance: Standard: Critical: Grade

  1. 3 CAUTION YON~ so uo
1. Operation of the TDAFW pump below Examinee reads and acknowledges the caution.

1400 rpm or above 4200 rpm will exceed the governor speed control range.

2. Opening SV-4188 too quickly could overspeed the TDAFP.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 4 2. Slowly OPEN SV-4188, TDAFP steam Examinee opens the TDAFP steam supply valve, Y~NO so uo valve. by manipulating C-05 control switch SV-4188 and observes TDAFP speed rising.

Cue:

BOOTH: Verify FW20C actuates when TDAFP speed exceeds 500 rpm and be prepared to delete FW20C when the examinee directs a PEO to locally reset the overspeed trip.

Comments: Opening SV-4188 is the only critical part to this step.

When the TDAFP speed rises above 500 rpm, the IO and malfunctions will trigger to simulate an overspeed trip.

6

PERFORMANCE INFORMATION JPM Number: JPM-84 Revision: 0/0 Task

Title:

Operate the TDAF].>_us_!ng_EOP 2541, Appendix 6 (Alt. Path}

STEP Performance: Standard: Critical: Grade

  1. 5 CONTINGENCY ACTIONS Examinee recognizes the TDAFP has tripped (on Y[SJ NO so uo overspeed) and begins Contingency Actions:

2.1 IF the TDAFW pump trips on overspeed, a. Adjusts governor speed to ensure at minimum.

PERFORM the following: (Examinee may state governor speed is already

a. ADJUST the turbine governor to at minimum or have a PEO check it locally).

minimum speed.

b. ENSURE MS-464,"TERRY TURBINE b. Closes steam supply valve operator to AUX FEED PUMP STEAM SUPPLY" MS-464 using SV-4188 until both green is closed. lights are lit (top one is already lit).
c. OPEN MS-436, "LS-4590 c. Instructs PEO to perform step "2.lc.".

INSTRUMENT DRAIN."

d. Instructs PEO to perform step "2.1 d.".
d. Slowly OPEN MS-447, "LS-4590 INSTRUMENT BACKUP DRAIN." e. Notes alarm window "AUX FW TURB
e. ENSURE alarm window "AUX FW STEAM LINE WATER LEVEL HI" is clear.

TURB STEAM LINE WATER LEVEL (A-14, COS).

HI" is clear. (A-14, COS) f. Instructs PEO to perform step "2.lf.".

f. WHEN the condensate has drained from the steam line drip pocket, CLOSE g. Instructs PEO to perform step "2.lg.".

BOTH MS-436 and MS-447. Examinee resets annunciator C-05/C-15 when

g. ENSURE that the TDAFW pump it clears.

overspeed trip mechanical latch is reset. h. When the PEO reports all required steps are

h. Go To Step 2. completed, the examinee proceeds to step "2."

to restart the TDAFP.

Cue:

BOOTH: Monitor for and reset alarms on all panels except C-05.

BOOTH: When a PEO is directed to perform step 2.lg local action, wait a couple minutes and delete the malfunction "FW20C".

Examiner: Closing SV-4188 to allow the overspeed trip mechanism to be reset locally is the only critical step.

When the overspeed trip is reset locally, the overspeed trip alarm on C-05 (C-15) will reset.

.If the US is performing communications with the PEO, then at this time inform the examinee that the PEO reports completing steps "c, d, f and g" and that all local conditions appear normal for the TDAFP.

Comments: Annunciator C-15 on C-05 will clear when the TDAFP overspeed trip mechanism is reset locally.

7

PERFORMANCE INFORMATION JPMNumber: JPM-84 Revision: 0/0 Task

Title:

Operate the TDAFP using EOP 2541, Appendix 6 (Alt. Path)

STEP Performance: Standard: Critical: Grade

  1. 6 2. Slowly OPEN SV-4188, TDAFP steam valve.

Examinee operates SV-4188 on C-05 and raises YIZ] ND so uo TDAFP speed.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 7 CAUTION Examinee reads and acknowledges the caution. YD NIZ] so uo Failure to perform TDAFW pump warmup can cause an overspeed trip due to condensate in the steam line or a sluggish governor speed control.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 8 3. ADJUST the TDAFW pump "SPD CNTL" Examinee adjusts governor speed on C-05 to YD NIZ] so uo switch to maintain minimum governor speed. maintain minimum speed of approximately 1400 rpm.

Cue:

Comments: The governor is already at minimum speed so the step is effectively NIA.

STEP Performance: Standard: Critical: Grade

  1. 9 4. WHEN TDAFW pump parameters have Examinee notes parameters are stable and raises YIZ] ND so uo stabilized, RAISE the "SPD CNTL" switch TDAFP speed until a rise in Auxiliary Feedwater to establish feed flow. flow is noted to both S/Gs on C-05.

Cue:

Comments:

When the TDAFP discharge pressure exceeds S/G pressure and AFW flow to both S/Gs begins to rise, the JPM is complete.

TERMINATION CUE: The evaluation for this JPM is concluded.

STOP TIME:

8

VERIFICATION OF JPM COMPLETION JPMNumber: JPM-S4 Revision: 0/0 Date Performed:

Student:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

EVALUATION SECTION:

Time Critical Task? D Yes lZ! No Validated Time (minutes): Actual Time to Complete (minutes):

I 15 I Work Practice Performance: D SAT D UNSAT Operator Fundamentals: D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question # 1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:

Print I Sign Areas for Improvement I Comments:

9

STUDENT HANDOUT JPMNumber: JPM-S4 Revision: 0/0 Initial Conditions: 1. The plant tripped from 100% power due to a loss of condenser vacuum.

2. All plant systems and components responded as designed on the trip.
3. EOP 2525, "Standard Post Trip Actions", were in progress when the "B

AFW pump tripped on overload.

Initiating Cues: 1. You are the Balance Of Plant (BOP) operator.

2. As the BOP, complete step 7a. RNO actions to place the TDAFW pump in service.

10

JOB PERFORMANCE MEASURE APPROVAL SHEET JPM

Title:

Restoring from Containment Spray fuadvertent Actuation JPMNumber: JPM-S5 Revision: 0/0 fuitiated:

Robert L. Cimmino, Jr. (Signature on File) 01/23/2017 Developer Date Reviewed:

Will Chesnutt (Signature on File) 0112712017 Technical Reviewer Date Approved:

Michael John Cote (Signature on File) 01/26/2017 Supervisor, Nuclear Training Date 1

SUMMARY

OF CHANGES DATE DESCRIPTION REV/CHANGE 01 /13/17 RLC Created JPM-S5 for NRC 2017 Exam Re-Take 010 2

JPM WORKSHEET Facility: MPUnit2 Examinee:

JPMNumber: JPM-S5 Revision:

- 0/0 Task

Title:

Restore From Inadvertent Containment Spray Actuation System: Containment Spray and ESAS Time Critical Task: DYES C8J NO Validated Time (minutes): 15 TaskNumber(s): (NUTIMS) 026-01-035 Applicable To: SRO - - - STA RO -X- - PEO - - -

K/ANumber: 026/A4.05 K/ARating:

- - -3.5/3.5 Method of Testing: Simulated Performance: Actual Performance: x Location: Classroom: Simulator: x In-Plant:

Task Standards: The examinee will reset ESAS and restore Facility 1 Containment Spray to its normal, at power configuration, following an inadvertent CSAS actuation, using AOP 2571, Inadvertent ESFAS Actuation.

Required Materials: Provide the examinee with a copy of AOP 2571, Inadvertent ESFAS Actuation, (procedures, equipment, etc.) with all applicable steps up to, and including, step 3.2 marked as "NIA".

General

References:

AOP 2571, Inadvertent ESFAS Actuation.

      • READ TO THE EXAMINEE ***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

3

JPM WORKSHEET JPMNumber: JPM-S5 Revision: 0/0 Initial Conditions: 1. Plant power is 100%, steady state, when an inadvertent Containment Spray actuation occurred on Facility 1 only.

2. The actuation has been deemed inadvertent because all plant conditions are normal and none of the Sensor Cabinet bistables have been triggered.
3. I&C and all applicable personnel have been notified.
4. The crew has entered AOP 2571, Inadvertent ESF AS Actuation, and has completed steps 3.1 and 3.2.

Initiating Cues: 1. You are the Reactor Operator (RO).

2. The US has instructed you to restore from the inadvertent CSAS using AOP 2571, Inadvertent ESFAS Actuation, starting at step 3.3.

Simulator Requirements: 1. Reset the simulator to any full power, stable IC and go to RUN.

2. Trigger malfunction ES02E, SPURIOUS F AC 1 CSAS SIGNAL
3. Wait for the CTMT Sump alarm (C-06/7, BA-21) to come in.
4. Then, acknowledge all alarms and place the simulator in FREEZE until the examinee is ready to take the watch.

NOTE: The simulator triggers an inadvertent CSAS by directly stimulating the ESAS Actuation Modules, and does not send a signal through the Sensor Modules. Therefore, the sensor bistables will not be triggered and will not have any red lights energized that need to be reset. This more precisely simulates an ESAS circuit failure based on OE.

        • NOTES TO TASK PERFORMANCE EVALUATOR****
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance ofthis JPM (in-plant only).

4

PERFORMANCE INFORMATION JPM Number: JPM-SS

--=-=:....::..:..::~~~~~~~~~~~~~~~~~

Revision: 0/0 Task

Title:

Restoring from _!;~mtainment Spray Inadvertent Actuation STARTTThlE: - - - -

STEP Performance: Standard: Critical: Grade

  1. 1 AOP 2571 2 Inadvertent ESF AS Actuation YO Ni:8J so uo 3.0 Inadvertent CSAS Actuation 3.1 IF an inadvertent bus 24C UV 3 .1. actuation Examinee recognizes step 3.1 is "NI A" or already has occurred, Go To AOP 2502C, "Loss of completed.

Vital 4.16 KV Bus 24C."

Cue: BOOTH: When the examinee is ready to take the watch place the simulator in RUN.

Comments: It is acceptable for the examinee to briefly review the control boards and AOP 2571 prior to taking the watch.

STEP Performance: Standard: Critical: Grade

  1. 2 3.2 IF an inadvertent bus 24D UV 3.2. actuation Examinee recognizes step 3.2 is "NIA" or already YO Ni:8J so uo has occurred, Go To AOP 2502D, "Loss of completed.

Vital 4.16 KV Bus 24D."

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 3 CAUTION Examinee reads and acknowledges the Caution YO Ni:8J so uo When an ESAS signal has been overridden by use of the equipment handswitch, then future ESAS signals will not be processed for that equipment until the ESAS modules have been reset.

Cue:

Comments: If the examinee chooses to make the US aware of the Caution, acknowledge any reports.

5

PERFORMANCE INFORMATION JPMNumber: JPM-SS Revision: 0/0 Task

Title:

Restoring from Containment Spray Inadvertent Actuation STEP Performance: Standard: Critical: Grade

  1. 4 3.3 IF an inadvertent containment spray Examinee notes the step applies and performs the actuation has occurred, PERFORM the following:

following as required:

a. CHECK Containment pressure less than a. Verifies CTMT pressure on C-01 < 9 .48 psig. YD N[2] so uo 9.48 psig. b. Overrides and stops the "A" CS Pump by
b. OVERRIDE CSAS start signals and taking the handswitch on C-01 to the "START" Y[2] ND so uo STOP containment spray pumps.(C- 01) and then the "STOP" position (more than one
c. OVERRIDE CSAS open signals and attempt is acceptable).

CLOSE the following valves:(C- 01)

c. Overrides and closes CS-4. lA, contaimnent
  • CS-4. lA, containment spray header spray header "A" isolation valve by taking the YD N[2] so uo "A" isolation handswitch to "OPEN" and then "CLOSED" on

"B" isolation

d. Go To Section 7.0, "Inadvertent CSAS d. Proceeds to Section 7 .0, "Inadvertent CSAS Y0Nl:2J so uo Actuation."

Actuation."

Cue:

Comments: Stopping of the "A" CTMT Spray Pump is the only step that is critical.

Examinee may state (per the Initiating Cue) that because only Facility 1 CSAS triggered, no action is required for the Facility 2 CTMT Spray components.

STEP Perfonnance: Standard: Critical: Grade

  1. 5 AOP 2571 2 Inadvertent ESFAS Actuation YD N[2] so uo 7.0 Inadvertent CSAS Actuation Examinee goes to Section 7.0 reads step 7.1 and 7.1 Refer To Attachment 2, "Resetting ESAS," then proceeds to Attachment 2, Section 2.0 Section 2.0, "Resetting CSAS," and "Resetting CSAS," for resetting the CSAS.

ATTEMPT to reset CSAS.

Cue:

Comments:

6

PERFORMANCE INFORMATION JPM Number: JPM-SS Revision: 0/0 Task

Title:

Restoring from Containment Spray Inadvertent Actuation STEP Performance: Standard: Critical: Grade

  1. 6 Attachment 2 2 Section 2.0 Resetting CSAS Examinee refers to Attachment 2, Section 2.0, YON~ so uo 2.1 PRESS to reset the following bistable Resetting CSAS. Examinee proceeds to ESAS and module "TRIP" lights: ensures the trip lights on the following bistables are reset:
  • "CTM PRESSURE CSAS BISTABLE BAl 02" (Sensor Cabinet A)
  • Sensor Cabinet A, bistable BAl 02
  • "CTM PRESSURE CSAS BISTABLE
  • Sensor Cabinet C, bistable BA302 BA302" (Sensor Cabinet C)
  • Sensor Cabinet D, bistable BA402
  • "CTM PRESSURE CSAS BISTABLE
  • Sensor Cabinet B, bistable BA202 BA402" (Sensor Cabinet D) Examinee may recognizes the Sensor bistables are
  • "CTM PRESSURE CSAS BISTABLE not triggered (all "TRIP" lights are de-energized),

BA202" (Sensor Cabinet B) as explained by the Initiating Cue, and consider the step "NIA".

Cue:

Comments: Although the Initiating Cue stated the Sensor bistables were not triggered by the circuit failure (simulator malfunction), the examinee may still elect to perform the step by pushing each de-energized trip light, just to be reassured it is complete.

STEP Performance: Standard: Critical: Grade

  1. 7 2.2 PRESS "CSAS ACTUATION RESET" Examinee presses the "CSAS ACTUATION Y~NO so uo (Actuation Cabinet 5). RESET" button on Actuation Cabinet 5.

Cue:

Comments:

7

PERFORMANCE INFORMATION JPM Number: JPM-SS Revision: 0/0 Task

Title:

Restoring from Containment Spray Inadvertent Actuation STEP Performance: Standard: Critical: Grade

  1. 8 2.3 OBSERVE BOTH of the following CSAS Examinee notes the "TRIP" lights on both CSAS YO NIS] so uo actuation module "TRIP" lights Actuation modules on Actuation Cabinet 5, extinguished (Actuation Cabinet 5): AM509 and AM510, are de-energized.
  • "CSAS GROUP 1 AM509"
  • "CSAS GROUP 2 AM51 O" Cue:

After the completion of step 2.3, inform the examinee that the JPM is complete.

Comments:

If the examinee notes the ATI should be reset, acknowledge and state that another operator will take care of that task.

TERMINATION CUE: The evaluation for this JPM is concluded.

STOP TIME: - - -

8

VERIFICATION OF JPM COMPLETION JPMNumber: JPM-SS Revision: 0/0 Date Performed:

Student:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

EVALUATION SECTION:

Time Critical Task? D Yes k8'.I No Validated Time (minutes): 15 Actual Time to Complete (minutes):

I I Work Practice Performance: D SAT D UNSAT Operator Fundamentals: D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question #1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:

Print I Sign Areas for Improvement I Comments:

9

STUDENT HANDOUT JPMNumber: JPM-SS Revision: 0/0 Initial Conditions: 1. Plant power is 100%, steady state, when an inadvertent Containment Spray actuation occurred on Facility 1 only.

2. The actuation has been deemed inadvertent because all plant conditions are normal and none of the Sensor Cabinet bistables have been triggered.
3. I&C and all applicable personnel have been notified.
4. The crew has entered AOP 2571, Inadvertent ESFAS Actuation, and has completed steps 3 .1 and 3 .2.

Initiating Cues: 1. You are the Reactor Operator (RO).

2. The US has instructed you to restore from the inadvertent CSAS using AOP 2571, Inadvertent ESFAS Actuation, starting at step 3.3.

10

JOB PERFORMANCE MEASURE APPROVAL SHEET JPM

Title:

Unload and Shutdown the "B" EDG (Alt Path)

JPMNumber: JPM-S6 (JPM 059) Revision: 10 Initiated:

Robert L. Cimmino, Jr. (Signature on File) 01/23/2017 Developer Date Reviewed:

Will Chesnutt (Signature on File) 01/27/2017 Technical Reviewer Date Approved:

Mike J. Cote (Signature on File) 02/01/2017 Supervisor, Nuclear Training Date 1

SUMMARY

OF CHANGES DATE DESCRIPTION REV/CHANGE 06/30/2014 dii Updated Material to new format and procedures 9 Updated Material to new format and procedures and added JPM 01/13/17 rlc 10 number designation for 2017 NRC Re-Take Exam 2

JPM WORKSHEET Facility: Millstone Unit 2 Examinee:

JPMNumber: JPM-86 (JPM 059) Revision: 10 Task

Title:

Unload and Shutdown the "B" EDG (Alt Path)

System: Emergency Diesel Generators Time Critical Task: ( ) YES (X) NO Validated Time (minutes): 10 Task Number(s): NUTIMS 064 01 121 Applicable To: SRO - - x- STA RO x PEO KIA Number: A4.06 KIA Rating: 3.913.9

- -064 ---- --- --- ----

Method of Testing: Simulated Performance: Actual Performance: x Location: Classroom: Simulator: x In-Plant:

Task Standards: At the completion of the JPM the examinee, while attempting to unload and secure the "B" EDG, will recognize an electrical fault has occurred that should have tripped the EDG but didn't, then respond by manually tripping the EDG.

Required Materials:

  • Simulator with the "B" EDG running paralleled at full load (procedures, equipment, etc.)
  • MP-PROC-OPS-ARP 2590F-140 COS D-35 DIESEL GEN 13U DIFFERENTIAL LOCKOUT General

References:

  • MP-PROC-OPS-ARP 2590F-140 COS D-35 DIESEL GEN 13U DIFFERENTIAL LOCKOUT
      • READ TO THE EXAMINEE ***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

3

JPM WORKSHEET JPMNumber: JPM-S6 (JPM 059) Revision: 10 Initial Conditions: 1. The Plant is stable at 100% power with all conditions normal.

2. The "B" EDG has been continually running at full load, in parallel with Bus 24D for a surveillance run.
3. All data was collected on OP 2346C-002, the Unit Supervisor has completed his review and all data is SAT.

Initiating Cues: The Unit Supervisor has directed you to Unload and Secure the "B" EDG in accordance with OP 2346C, "B" Emergency Diesel Generator procedure.

Simulator Requirements:

  • Initialize to any 100% IC with the "B" EDG fully loaded X-Tied to 24D

[Note: IC-139 is saved with all required JPM conditions]

  • Under EG, insert the following I/O Overrides to prevent the "B" DG MAN START/STOP switch from tripping the "B" DG:

o EGDGH7B15G13U_l - B DIG "Ready to Load" light on; W o EGDGH7B 1SG13U_2 - B DIG "Standby" light off; NW o 06A1A5S34 -B DIG Manual Start/Stop Switch; AUTO

  • To simulate a fault, create Event 1 with the following:

o Trigger C08-D35; [ON], DIESEL GEN 13U DIFFERENTIAL LOCKOUT.

o Trigger C08-B36; [ON], DIESEL GEN 13U TROUBLE.

o TriggerC08-C31; [ON], 13U AUTO VOLTAGE REGULATOR SETPOINT NOT 4160 VAC.

o I/O EGV2/MTR15G-13U; DG "B" Volts [300 AC_KV, no ramp]

o I/O EGA2/MTR15G-13U; DG "B" Amps [600 AC_AMP, no ramp]

o I/O EGVAR/MTRl 5G-13U, DIG "B" V ARs [2000 K, no ramp]

o I/O EGW-2/MTR15G-13U, DIG "B" Power [300 AC_KW, no ramp]

All of the above items must be duplicated to auto delete (return to normal) one second after a second BT is triggered. This second BT should be triggered at the time the EDG is manually tripped by the examinee, so the simulator correctly reflects the EDG is no longer operating.

        • NOTES TO TASK PERFORMANCE EVALUATOR****
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

4

PERFORMANCE INFORMATION JPMNumber: JPM-S6 (JPM 059) Revision: 10 Task

Title:

Unload and Shutdown the "B" EDG (Alt Path)

START TIME: - - - -

STEP Performance: Standard: Critical: Grade

  1. 1 OP 2346Ci "B" Emergency Diesel Generator Examinee reads the initial conditions and proceeds YON~ so uo Section 4.6, Unloading and Shutdown of "B" to Section 4.6.

DG from Control Room 4.6.1 IF "B" DG has been operated at low load Examinee notes per the Initial Conditions, Step

(<5 0% of full load) for greater than or 4.6.1 is N/As equal to eight hours, Refer To Section 4.5 and LOAD the diesel to between 2,550 and 2,650 kW for at least one hour.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 2 NOTE YON~ so uo During isochronous mode of operation (i.e., not Examinee reads and N/As the NOTE the EDG is in in unit parallel), generator load is decreased by Unit parallel stopping components powered from applicable buses.

4.6.2 WHEN required DG run time has lapsed Examinee notes per the Initial Conditions, Step OR otherwise directed, ENSURE all 4.6.2 is complete.

required data has been recorded on OP 2346C-002.

Cue:

Comments:

OP 2346A-002 was completed and signed off per the Initial Conditions.

5

PERFORMANCE INFORMATION JPMNumber: JPM-S6 (JPM 059) Revision: 10 Task

Title:

Unload and Shutdown the "B" EDG (Alt Path)

STEP Performance: Standard: Critical: Grade

  1. 3 4.6.3 WHEN lowering DG load, MAINTAIN Kvar loading at 50% of kW value, using Examinee maintains KVARs at approximately 50% YD N[gj so uo of EDG Load using the Voltage Regulator.

"B" DG "VOLTAGE CNTL REG AUTO CNTL" (C-08).

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 4 4.6.4 ADJUST "B" DG "LOAD CNTL Examinee adjusts the Governor Control to obtain YD N[gj so uo GOVERNOR CNTL" to reduce load to 1400 KW and voltage Regulator to~ 700 Kvars in 1,400 kW (C-08). equal adjustments maintaining Kvars half of KW.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 5 NOTE YD N[gj so uo DG operation at 1,400 kW for at least five Examinee reads and acknowledges the note.

minutes allows for proper cooldown of components and equalization of temperatures.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 6 4.6.5 ALLOW DG to operate at 1,400 kW for at When EDG is at ~ 1400 KW the Examinee states YD N[gj so uo least five minutes. they are waiting the 5 minutes for cooldown.

Cue:

BOOTH: Once the examinee reports they are waiting the 5 minutes, or at the discretion of the examiner, trigger Event 1.

Comments:

Actions taken for the EDG malfunction are in the subsequent JPM steps.

6

PERFORMANCE INFORMATION JPMNumber: JPM-S6 (JPM 059) Revision: 10 Task

Title:

Unload and Shutdown the "B" EDG (Alt Path)

STEP Performance: Standard: Critical: Grade

  1. 7 OP 2346C, "B" Emergency Diesel Generator Precaution 3.8, 3.8 The following steps for use in emergencies (since it causes abrupt changes in engine 1* Examinee dete1mines an abnormal condition exists and the "B" DIG and output breaker YD N['.] so uo loading and power output to the line) have should have tripped.

been discussed in pre-job briefing: 1

  • Examinee simultaneously (momentarily) presses both EMERG STOP buttons for the Y['.] ND so uo
3. 8 .1 If, at any time, it becomes necessary to immediately stop either DG, perform the "B" DIG.

following:

a. Using "EMERGENCY STOP. PUSH 1* Examinee observes the following:

o "B" DIG and the output breaker trip YD N['.] so uo TO STOP ENGINE," button, TRIP o "B" DIG Frequency is at minimum (58 Hz).

DG fuel racks (local) OR o "B" DIG output breaker, A401, is open simultaneously press both "EMERG (green light is lit and red light is out).

STOP" buttons for DG (C-08) (C-38 if in local control).

b. Ensure the following (C-38):
  • DG "AC. BREAKER" opens
  • Field excitation indicates 0 volts
  • Diesel engine shuts down Cue:

If the Examinee recommends tripping the "B" EDG, acknowledge and concur with the recommendation.

Comments:

  • The normal Start/Stop switch will not function to stop the "B" DIG (as part of the JPM to require use of the trip buttons).
  • The examinee may use the guidance of OP 2346C, Precaution 3.8, or ARP-2590F-140 (C-081D-35) to manually trip the EDG.
  • It is NOT critical which procedural guidance is used, only that the EDG be manually tripped from C-08.
  • Once the "B" DIG is emergency tripped from C-08, the JPM is complete.

7

PERFORMANCE INFORMATION JPMNumber: JPM-S6 (JPM 059) Revision: 10 Task

Title:

Unload and Shutdown the "B" EDG (Alt Path)

STEP Performance: Standard: Critical: Grade

  1. 8 ARP 2590F-140 2 "DIESEL GEN 13U
  • Examinee observes some or all of the YD NC2] so uo DIFFERENTILA LOCKOUT" (C-08/D-35} following:

AUTOMATIC FUNCTIONS 0 Several parameters change.

1. Generator output breaker, A401 and diesel 0 D-35; DIESEL GEN 13U trip. DIFFERENTIAL LOCKOUT
2. Generator output breaker, closing circuitry is 0 B-36; DIESEL GEN 13U TROUBLE blocked.

CORRECTIVE ACTIONS

  • Examinee determines that the "B" DIG and YD NC2] so uo output breaker should have tripped.
1. IF "B" DG has not tripped, PRESS both "EMERG STOP" buttons for "B" DG (C-08).
  • Examinee simultaneously (momentarily) YC2] ND so uo
2. VERIFY "DG B FDRBKR, 15G-13U-2 presses both EMERG STOP buttons for the "B" DIG.

(A401)" open (C-08).

  • Examinee observes that the "B" DIG and the YD NC2] so uo output breaker trip:

o "B" DIG Frequency is at minimum (58 Hz).

o "B" DIG output breaker, A401, is open (green light is lit and red light is out).

Cue:

If the Examinee recommends tripping the "B" EDG, acknowledge and concur with the recommendation.

Comments:

  • The normal Start/Stop switch will not function to stop the "B" DIG (as part of the JPM to require use of the trip buttons) .
  • The examinee may use the guidance of OP 2346C, Precaution 3.8, or ARP-2590F-140 (C-08/D-35) to manually trip the EDG .
  • It is NOT critical which procedural guidance is used, only that the EDG be manually tripped from C-08 .
  • Once the "B" DIG is emergency tripped from C-08, the JPM is complete.

TERMINATION CUE: The evaluation for this JPM is concluded.

STOP TIME: - - -

8

VERIFICATION OF JPM COMPLETION JPMNumber: JPM-S6 (JPM 059) Revision: 10 Date Performed:

Student:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

As necessary, refer to TIG-04 for additional Pass/Fail criteria.

EVALUATION SECTION:

Time Critical Task? D Yes IZ! No Validated Time (minutes): 10 Actual Time to Complete (minutes):

I I Work Practice Performance: D SAT D UNSAT Operator Fundamentals: D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question #1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:

Print I Sign Areas for Improvement I Comments:

9

STUDENT HANDOUT JPMNumber: JPM-S6 (JPM 059) Revision: 10 Initial Conditions: 1. The Plant is stable at 100% power with all conditions nonnal.

2. The "B" EDG has been continually running at full load, in parallel with Bus 24D for a surveillance run.
3. All data was collected on OP 2346C-002, the Unit Supervisor has completed his review and all data is SAT.

Initiating Cues: The Unit Supervisor has directed you to Unload and Secure the "B" EDG in accordance with OP 2346C, "B" Emergency Diesel Generator procedure.

10

JOB PERFORMANCE MEASURE APPROVAL SHEET JPM

Title:

Respond to SG Level Safety Channel Failure Low JPMNumber: JPM-S7 Revision: 010 Initiated:

Robert L. Cimmino, Jr. (Signature on File) 01/30/2017 Developer Date Reviewed:

Will Chesnutt (Signature on File) 01/31/2017 Technical Reviewer Date Approved:

Michael J. Cote (Signature on File) 02/01/2017 Supervisor, Nuclear Training Date 1

SUMMARY

OF CHANGES DATE DESCRIPTION REV/CHANGE 01/12/17 RLC Created new JPM for 2017 NRC Re-Take 010 2

JPM WORKSHEET Facility: MPUnit2 Examinee:

JPMNumber: Revision:

JPM-S7

- 0/0 Task

Title:

Respond to SG Level Safety Channel Failure Low System: RPS andAFAS Time Critical Task: D YES 12:1 NO Validated Time (minutes): 10 Task Number(s): NUTIMS # 012-01-006 Applicable To: SRO STA RO X PEO KIA Number: KIA Rating: 3.613.6

- - -012/A4.03 Method of Testing: Simulated Performance: Actual Performance: x Location: Classroom: Simulator: x In-Plant:

Task Standards: At the completion of this JPM, the examinee has responded to the failure of Safety Channel "B" Steam Generator Level, to include bypassing the appropriate RPS and AFAS channels.

Required Materials:

  • ARP 2590C-006, CB-1, Rev. 000-00, "SG LO LEVEL TRIP CH B" (procedures, equipment, etc.)
  • Unit 2 Technical Specifications
  • RPS bypass key for SG Level
  • C-51 7 and C-518 bypass keys General

References:

ARP 2590C-006, CB-1, Rev. 000-00, "SG LO LEVEL TRIP CH B"

      • READ TO THE EXAMINEE ***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

3

JPM WORKSHEET JPMNumber: JPM-S7 Revision: 0/0 Initial Conditions: The plant is stable at 100% power with all operating conditions normal.

Initiating Cues:

  • You are the BOP .
  • Respond to changing parameters and alarms by reporting your observations and conclusions.
  • The examiner will act as the Unit Supervisor, participate in the communication process.
  • Make recommendations and perfonn actions as required.

Simulator Requirements:

  • Initialize to any at power IC with all operating conditions normal.
  • Ensure all bypass keys are removed from Channel "B" of RPS and C-517 and C-518.
  • When examinee is in position (or directed by the floor evaluator), enter malfunction RP13B at 0% severity, no ramp, to fail LT-l l 13B (#1 SG Safety Ch "B" level) input to all systems at 0%.
        • NOTES TO TASK PERFORMANCE EVALUATOR****
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

4

PERFORMANCE INFORMATION JPMNumber: JPM-S7 Revision: 0/0 Task

Title:

Respond to SG Level Safety Channel Failure Low START TIME: - - - -

STEP Performance: Standard: Critical: Grade

  1. 1 C-04, CB-1; ARP 2590C-006, "SG LO Examinee acknowledges the C-04 alarm, checks YON~ so uo LEVEL TRIP CH B" Actions: primary plant parameters, notes reactor did not trip AUTOMATIC FUNCTIONS and reports observations to the US.

Examinee should recommend and/or reference

1. If 2 RPS channels actuate, reactor trips.

ARP 2590C-006 and note that two channels of RPS did not actuate and the reactor did not trip.

Cue: Booth: when directed, activate malfunction RP13B at 0%, no ramp.

When the alarm actuates, solicit status of the reactor if not automatically given. Acknowledge any communication as the US and solicit recommendations for actions to take for the alarm ifthe examinee does not suggest referencing the applicable ARP.

Comments:

STEP Performance: Standard: Critical: Grade

  1. 2 CORRECTIVE ACTIONS Examinee notes reactor did not trip and the step is YON~ so uo
1. IF reactor trips, Go To BOP 2525, NIA (i.e.; does not transition to EOP 2525).

"Standard Post Trip Actions" and PERFORM necessary corrective actions.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 3 2. OBSERVE channel "B" SG level indication Examinee notes # 1 SG Safety Channel "B" level YON~ so uo and COMPARE to other safety channel indication has failed low, when compared to the indications (C-05, PPC). other three safety channels.

Cue:

Comments: Examinee may also note the #1 SG level control channel has not changed from pre-event conditions.

5

PERFORMANCE INFORMATION JPMNumber: JPM-S7 Revision: 0/0 Task

Title:

Respond to SG Level Safety Channel Failure Low STEP Performance: Standard: Critical: Grade

  1. 4 3. IF SG level is less than 49.5% AND no Examinee notes SG actual level has not lowered YD N[8] so uo automatic reactor trip has occurred, below pre-event values (i.e.; does not transition to manually TRIP reactor and Go To EOP EOP 2525).

2525, "Standard Post Trip Actions."

Cue:

Comments:

STEP Perfonnance: Standard: Critical: Grade

  1. 5 4. IF SG level is greater than 49.5% AND Examinee notes SG level is greater than 49.5% and YD N[8] so uo alann is due to instrument malfunction, notes alann appears to be due to instrument PERFORM the following: malfunction.

4.1. OBTAIN necessary keys and PERFORM applicable actions to Examinee obtains RPS SG Level bistable bypass Y[8] ND so uo key (#4) from applicable RPS channel, inserts it bypass channel "B" SG level into RPS Channel "B" SG Level bistable and bistables on RPS, C-517, and C-518. turns it clockwise to bypass the tripped bistable.

4.2. Refer To the following Technical Examinee gets 2 AFAS bypass keys from Specifications LCOs and simulator key locker, inserts a key into HS-DETERMINE applicability: 1113B-1 (C-517) and HS-1113B-2 (C-518) and

  • 3.3.1.1, Table 3.3-1 turns both keys clockwise to bypass the failed
  • 3.3.2.1, Table 3.3-3 Channel "B" SG Level inputs to both facilities
  • 3.3.3.5, Table 3.3-9 (LI-1123B only) ofAFAS .

Examinee then suggests the US refer to the listed YD N[8] so uo Tech. Spec. LCOs to detennine applicability.

Cue: As necessary:

Solicit examinee for suggested actions and concur.

Note that the RO will continue as Operator At The Controls (while BOP goes behind the control boards).

Comments: Step "4.1" is the only critical part of JPM Step #5.

TERMINATION CUE: The evaluation for this JPM is concluded.

STOP TIME:

6

VERIFICATION OF JPM COMPLETION JPMNumber: JPM-S7 Revision: 0/0 Date Performed:

Student:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

EVALUATION SECTION:

Time Critical Task? D Yes C8'.I No Validated Time (minutes): 10 Actual Time to Complete (minutes):

I I Work Practice Performance: D SAT D UNSAT Operator Fundamentals: D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question # 1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:

Print I Sign Areas for Improvement I Comments:

STUDENT HANDOUT 7

JPMNumber: JPM-S7 Revision: 0/0 Initial Conditions: The plant is stable at 100% power with all operating conditions normal.

Initiating Cues:

  • You are the BOP .
  • Respond to changing parameters and alarms by reporting your observations and conclusions.
  • The examiner will act as the Unit Supervisor, participate in the communication process.
  • Make recommendations and perform actions as required.

8

JOB PERFORMANCE MEASURE APPROVAL SHEET JPM

Title:

Respond to the Loss of a 2nd Circulating Water Pump JPMNumber: JPM-S8 Revision: 010 Initiated:

Robert L. Cimmino, Jr. (Signature on File) 01/30/2017 Developer Date Reviewed:

Will Chesnutt (Signature on File) 01/31/2017 Technical Reviewer Date Approved:

Michael J. Cote (Signature on File) 02/01/2017 Supervisor, Nuclear Training Date 1

SUMMARY

OF CHANGES DATE DESCRIPTION REV/CHANGE 01/18/17 rlc Created new JPM for 2017 NRC Re-Take Exam 010 2

JPM WORKSHEET Facility: MPUnit2 Examinee:

JPMNumber: JPM-S8 Revision: 0/0 Task

Title:

Respond to the Loss of a 2°d Circulating Water Pump System: Circulating Water Time Critical Task: D YES l3:I NO Validated Time (minutes): - - - -

Task Number(s): 000-04-250 Applicable To: SRO x STA RO x PEO KIA Number: KIA Rating:

075/A2.02

- - -2.5/2.7 Method of Testing: Simulated Performance: Actual Performance: x Location: Classroom: Simulator: x In-Plant:

Task Standards: At the completion of this JPM, the examinee has cross-tied the "A" and "B" Circ.

Water pumps in response to an existing trip of the "A" Circ. Water pump, noted the subsequent loss of the "B" Circ. Water pump and either recommends or initiates a manual plant trip prior to an automatic plant trip on high condenser backpressure.

Required Materials: AOP 2517, Circulating Water Malfunctions (procedures, equipment, etc.) ARP 2590E-050 (C06/7, B-9); CIRC WATER PUMP B OVERLOAD/TRIP General

References:

AOP 2517, Circulating Water Malfunctions ARP 2590E-050 (C06/7, B-9); CIRC WATER PUMP B OVERLOAD/TRIP

      • READ TO THE EXAMINEE ***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as ifthe evolution was actually being performed.

3

JPM WORKSHEET JPMNumber: JPM-S8 Revision: 0/0 Initial Conditions: The "A" Circulating Water pump has just tripped on overload and the crew has entered AOP 2517, Circulating Water Malfunctions.

The plant is at 100% power, steady state, with all other systems and components are operating normally for the given conditions.

No liquid waste discharges are on progress.

No sodium hypochlorite shocking of bays is in progress.

Initiating Cues: You are the Balance Of Plant (BOP) operator and have been instructed by the US to commence the actions of AOP 2517, Circulating Water Malfunctions, starting with step 3.0, Initial Actions.

Simulator Requirements: 1. Initialize to 100% power, steady state, all equipment operating normally.

2. Ensure all VFDs are set to 100%
3. Trip the "A" CW pump (CWOlA), acknowledge all alarms and place simulator in FREEZE until the examinee takes the watch.
4. Call up the malfunction to trip the "B" CW pump (CWOlB) and have it ready to trigger.
        • NOTES TO TASK PERFORMANCE EVALUATOR****
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

4

PERFORMANCE INFORMATION JPMNumber: JPM-S8 Revision: 0/0 Task

Title:

Respond to the Loss of a 2"d Circulating Wafor _PumQ START TIME: - - - -

STEP Performance: Standard: Critical: Grade

  1. 1 AOP 2517 2 Circ. Water Malfunctions YON~ so uo 3.0 Initial Actions INSTRUCTIONS 3 .1 CHECK the following condition exists:
  • BOTH circulating water pumps are tripped in ONE condenser Examinee notes that only one Circ. Water pump CONTINGENCY ACTIONS has tripped and per the Contingency Action 3 .1.1, 3.1.1 Proceed To step 3.3. proceeds to step 3 .3 Cue:

BOOTH: When the examinee is ready to take the watch, place the simulator in RUN.

Comments:

STEP Performance: Standard: Critical: Grade

  1. 2 *3 .3 MONITOR condenser backpressure The examinee should continuously monitor (*) YON~ so uo maintained less than or equal to 4.5 in Hg. condenser backpressure to ensure</= 4.5" Hg.

Ifbackpressure is>/= 6.5" Hg, the Examinee notes the Contingency Action guidance and recommends and/or trips the plant.

Cue:

If examinee suggests the plant be (conservatively) tripped due to rising condenser back pressure, decline the request and state that backpressure appears to be rising at a slower rate and to continue with the AOP actions at this time.

Comments:

Once a 2nd CW pump is lost, the examinee may recommend tripping the plant at any time due to rising backpressure. If this recommendation is made, the JPM may be considered complete.

5

PERFORMANCE INFORMATION JPMNumber: JPM-S8 Revision: 0/0 Task

Title:

Respond to the Loss of a-1:d Cir~ulating Water Pump STEP Performance: Standard: Critical: Grade

  1. 3 3.4 RAISE speed of all VFD mode operating Examinee notes all VFDs at I 00% value. YON~ so uo circulating water pumps to I 00%.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 4 3.5 CLOSE water box inlets for pumps which Examinee notes the "A" CW pump has tripped and Y~NO so uo tripped: closes CW-1 IH, "A" water box inlet on C-06 (red
a. CW-1 lH, "A" water box inlet light out, green light lit).
b. CW-11 G, "B" water box inlet
c. CW-llF, "C" water box inlet
d. CW-1 lE, "D" water box inlet Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 5 NOTE YON~ so uo A 15 to 20 second pause is required after Examinee reads and acknowledges the note.

receiving the full closed position indication to allow for full closure prior to opening the crosstie valve.

Cue:

Comments:

6

PERFORMANCE INFORMATION JPM Number: _JP:.. ::.. .::M.:.::__:-S:..:8:_____ _ _ _ _ _ _ _ _ _ _ _ _ __ Revision: 0/0 Task

Title:

Respond to the Loss of a 2"d Circulating Water Pump STEP Performance: Standard: Critical: Grade

  1. 6 3.6 CHECK water box inlets for tripped pumps closed.

Examinee notes CW-I IH is closed, waits I5 - 20 Ytzl ND so uo seconds, then opens CW-12D, condenser IA inlet

a. OPEN the following waterbox cross-tie cross-tie (red light lit, green light out on C-06).

valves for tripped pump(s):

  • CW-I2D, condenser IA inlet cross-tie
  • CW- I 2C, condenser 1B inlet cross-tie Cue:

BOOTH: When examinee completes step 3.6 (before beginning step 3.7) immediately trip the "B" CW Pump (trigger CWOlB).

Comments: The critical only action is to open CW-12D. When the 2°ct CW pump is lost, the examinee may immediately recommend tripping the plant.

STEP Performance: Standard: Critical: Grade

  1. 7 ARP 2590E-050 (C06/7, B-9); CIRC WATER Examinee notes and acknowledges the "B" CW YD N[8J so uo PUMP B OVERLOAD/TRIP pump trip.

AUTOMATIC FUNCTIONS Examinee informs US of the "B" CW pump trip.

1. "B" circulating water pump trips and alarms.

CORRECTIVE ACTIONS Examinee may elect to recommend and/or trip the plant at this time, or proceed with the ARP Y[8J ND so uo guidance to demonstrate the procedure flow path.

1. NOTIFY Security Shift Operations Supervisor that the "B" circulating water 1. Informs US to notify Security Shift Operations pump has tripped. Supervisor that the "B" circulating water pump
2. Go To AOP 25I7, "Circulating Water has tripped.

Malfunctions." 2. Goes back to AOP 2517, CW Malfunctions.

Cue: If at any time a plant trip is recommended, concur and direct.

Comments: If required, inform examinee that the Security Shift Operations Supervisor has been notified of the "B" CW pump trip.

This step is critical only if a plant trip is recognized to be needed at this time. Examinee may first elect to refer to this ARP, and then go back to AOP 25 I 7 to demonstrate a procedure path. If the plant~ tripped at this time, the remaining steps are not critical.

However, an automatic plant trip due to high condenser backpressure occurring before the examinee recommends a manual trip constitutes a failure of the JPM.

Manually tripping the plant, or recommending the plant be manually tripped, due to the loss of a 2°d CW pump or rising condenser backpressure, successfully completes the JPM.

7

PERFORMANCE INFORMATION JPMNumber: JPM-S8 Revision: 0/0 Task

Title:

Respond to the Loss of a 2°d Circulating Water Pump STEP Performance: Standard: Critical: Grade

  1. 8 AOP 2517 2 Circ. Water Malfunctions YON~ so uo 3.0 Initial Actions INSTRUCTIONS Examinee notes both circulating water pumps are 3 .1 CHECK the following condition exists: tripped in one condenser and proceeds to step 3 .2
  • BOTH circulating water pumps are tripped in ONE condenser Cue:

If at any time a plant trip is recommended, concur and direct.

Comments:

An automatic plant trip due to high condenser backpressure occurring before the examinee recommends a manual trip constitutes a failure oftheJPM.

Manually tripping the plant (or recommending the plant be tripped) due to the loss of a 2"d CW pump, or rising condenser backpressure, successfully completes the JPM.

STEP Perfonnance: Standard: Critical: Grade

  1. 9 NOTE Examinee reads and acknowledges the note. YON~ so uo When power is less than 15% AND linear power bistable light clears (not lit), on at least 3 RPS channels, the turbine trip is inhibited and turbine trip will not result in an automatic reactor trip.

Cue:

Comments:

8

PERFORMANCE INFORMATION JPM Number: JPM-S8 Revision: 0/0 Task

Title:

Respond to the Loss of a znd Circulating Water Pump STEP Performance: Standard: Critical: Grade

  1. 10 3.2 CHECK BOTH of the following conditions Examinee notes power is> 15% and references the YON~ so uo exist: Contingency Action 3 .2.1.
  • Power less than 15%

Comments:

STEP Performance: Standard: Critical: Grade

  1. 11 CONTINGENCY ACTIONS Y~NO so uo 3.2.1 IF greater than or equal to 15% power, Examinee recommends and/or trips the plant.

THEN PERFORM the following actions:

a. TRIP the reactor and turbine.
b. Go To EOP 2525, "Standard Post Trip Actions.

Cue:

Hat any time a plant trip is recommended, concur and direct.

Comments:

An automatic plant trip due to high condenser backpressure occurring before the examinee recommends a manual trip constitutes a failure of the JPM.

Manually tripping the plant (or recommending the plant be tripped) due to the loss of a 2°d CW pump, or rising condenser backpressure, successfully completes the JPM.

TERMINATION CUE: The evaluation for this JPM is concluded.

STOP TIME: - - -

9

VERIFICATION OF JPM COMPLETION JPMNumber: JPM-S8 Revision: 0/0 Date Performed:

Student:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

EVALUATION SECTION:

Time Critical Task? 0 Yes ~No Validated Time (minutes): 10 Actual Time to Complete (minutes):

I I Work Practice Performance: D SAT D UNSAT Operator Fundamentals: D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question # 1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:

Print I Sign Areas for Improvement I Comments:

10

STUDENT HANDOUT JPMNumber: JPM-S8 Revision: 0/0 Initial Conditions: The "A" Circulating Water pump has just tripped on overload and the crew has entered AOP 2517, Circulating Water Malfunctions.

The plant is at 100% power, steady state, with all other systems and components are operating normally for the given conditions.

No liquid waste discharges are on progress.

No sodium hypochlorite shocking of bays is in progress.

Initiating Cues: You are the Balance Of Plant (BOP) operator and have been instructed by the US to commence the actions of AOP 2517, Circulating Water Malfunctions, starting with step 3 .0, Initial Actions.

11

JOB PERFORMANCE MEASURE APPROVAL SHEET JPM

Title:

Mitigate a Reactor Regulating System Failed T cow Input JPMNumber: JPM-S9 Revision: 010 Initiated:

Robert L. Cimmino, Jr. 02/03/2017 Developer Date Reviewed:

Will Chesnutt Technical Reviewer Date Approved:

Michael John Cote Supervisor, Nuclear Training Date 1

SUMMARY

OF CHANGES DATE DESCRIPTION REV/CHANGE 01/31/2017 rlc Created new JPM for 2017 NRG Re-Take Exam 010 2

JPM WORKSHEET Facility: MPUnit2 Examinee:

JPM Number: JPM-S9 Revision: 0/0 Task

Title:

Mitigate a Reactor Regulating System Failed T coLo Input System: Reactor Regulating System Time Critical Task: DYES ~NO Validated Time (minutes): 10 Task Number(s): NUTIMS 041-01-003 Applicable To: SRO

--- STA - - - - RO

-- x- PEO - - -

KIA Number: 016/A4.0l KIA Rating:

- - -2.9/2.8 Method of Testing: Simulated Performance: Actual Performance: x Location: Classroom: Simulator: x In-Plant:

Task Standards: The Examinee will use OP 2386, Reactor Regulating System, Section 4.2, "Removing (bypassing) Faulty Indication", to deselect a failed T cow input and restore system calculated outputs to normal.

Required Materials: OP 2386, "Reactor Regulating System" (procedures, equipment, etc.) ARP 2590C-148, 'TAVG-TREF HI/LO" (C-04/DA-19)

General

References:

OP 2386, "Reactor Regulating System"

      • READ TO THE EXAMINEE ***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

3

JPM WORKSHEET JPMNumber: JPM-S9 Revision: 0/0 Initial Conditions: 1. The Plant is at 100% power, steady state.

2. Loop 1 Tcorn temperature transmitter, TE-111 Y, has failed to 614°F.
3. I&C has been notified.

Initiating Cues: 1. You are the Balance Of Plant (BOP) operator.

2. The Unit Supervisor has directed you to bypass the failed Tcorn input to the Reactor Regulating System IA W OP 2386, "Reactor Regulating System", Section 4.2, "Removing (bypassing) Faulty Indication".

Simulator Requirements: 1. Initialize the simulator to any steady state, 100% power IC.

2. Enter malfunction RXOSA at 614°F to fail TE-111 Y input to the RRS.
3. Acknowledge all alarms.
4. On the BOP "Foxboro control PPC" application, select the "FEEDWATER HEATERS OVERVIEW" screen.
        • NOTES TO TASK PERFORMANCE EVALUATOR****
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

4

PERFORMANCE INFORMATION JPMNumber: JPM-S9 Revision: 0/0 Task

Title:

Mitigate a Reactor Regulating System T cow Input Failure START TIME: _ _ __

STEP Performance: Standard: Critical: Grade

  1. 1 OP 2386~ Reactor Regulating System 1. Examinee references OP 2386, "Reactor YD NIZ! so uo 4.2 Removing (bypassing) Faulty Indication Regulating System" (RRS), Section 4.2, "Removing (bypassing) Faulty Indication"
2. Examinee uses any BOP computer work station to access the "Foxboro control PPC" application.

Cue:

Comments: All required actions in Steps 4.2.1 - 4.2.6 are performed on the Foxboro control PPC interface to the Foxboro IA system.

STEP Performance: Standard: Critical: Grade

  1. 2 4.2.1 SELECT "Change Env" (Foxboro Examinee selects "Change Env" on the application. YD NIZ! so uo control PPC).

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 3 4.2.2 SELECT "Reactor-Reg" (environment The RRS Instruments screen has been selected on YIZ! ND so uo selection screen PPC). the Foxboro control PPC.

4.2.3 CLICK on "OK."

4.2.4 SELECT "RRS Instruments" screen (Foxboro control PPC).

Cue:

Comments: The RRS Instrument screen is labeled "REACTOR REGULATING & STEAM DUMP PROGRAM TEMPERATURE and PRESSURE INSTRUMENT SELECTION".

5

PERFORMANCE INFORMATION JPMNumber: JPM-S9 Revision: 0/0 Task

Title:

Mitigate a Reactor Regulating System TCOLD Input Failure STEP Performance: Standard: Critical: Grade

  1. 4 NOTE Examinee reads and acknowledges the Note. YD N[8] so uo Removing a temperature input from the Selected Loop could cause Pressurizer level setpoint to change.

Cue: If required, inform the examinee that the RO is monitoring pressurizer level control for any changes.

Comments:

STEP Performance: Standard: Critical: Grade

  1. 5 4.2.5 SELECT the input to be bypassed and Examinee CLICKS the "NORMAL" button under Yi:8] ND so uo PRESS the "NORMAL" button. the TE-lllY indication.

Cue: The button label for TE-111 Y must be changed from "NORMAL" to "BYPASSED" for the failed input to be successfully bypassed from the RRS output calculations.

Comments:

STEP Performance: Standard: Critical: Grade

  1. 6 4.2.6 OBSERVE that the "NORMAL" button Examinee observes the TE-111 Y input is now YD Ni:8] so uo changed to "BYPASSED." bypassed.

Cue:

Comments: This completes the JPM.

TERMINATION CUE: The evaluation for this JPM is concluded.

STOP TIME:

6

VERIFICATION OF .JPM COMPLETION JPMNumber: JPM-S9 Revision: 0/0 Date Performed:

Student:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

EVALUATION SECTION:

Time Critical Task? D Yes D No Validated Time (minutes): 10 Actual Time to Complete (minutes):

I I Work Practice Performance: D SAT D UNSAT Operator Fundamentals: D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question #1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:

Print I Sign Areas for Improvement I Comments:

7

STUDENT HANDOUT JPMNumber: JPM-S9 Revision: 0/0 Initial Conditions: 1. The Plant is at 100% power, steady state.

2. Loop 1 T COLD temperature transmitter, TE-111 Y, has failed to 614°F.
3. I&C has been notified.

Initiating Cues: 1. You are the Balance Of Plant (BOP) operator.

2. The Unit Supervisor has directed you to bypass the failed T coLD input to the Reactor Regulating System IAWOP 2386, "Reactor Regulating System", Section 4.2, "Removing (bypassing) Faulty Indication".

8

JOB PERFORMANCE MEASURE APPROVAL SHEET JPM

Title:

Transferring Computer UPS 480 V AC Main Power Supply JPMNumber: JPM-Pl (JPM-116) Revision: 5 Initiated:

John W. Riley (Signature on File) 01/23/2017 Developer Date Reviewed:

Will Chesnutt (Signature on File) 01127/2017 Technical Reviewer Date Approved:

Michael John Cote (Signature on File) 02/01/2017 Supervisor, Nuclear Training Date 1

SUMMARY

OF CHANGES DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format 310 06-11-07 (DAP) Verified JPM to comply with 2349A Rev 010-001. Made minor 310 changes to font and format but nothing of substance.

JWR 08-07-2012 Updated to new Format. Minor editorial changes. 311 07/22/2015 - RJA Updated to newest format and latest procedure revision. 4 1/16/17 jwr Reviewed and validated for 201 7 NRC JPM exam. Changed Task 5 Number, minor changes some cues and initiating cue.

2

JPM WORKSHEET Facility: MP2 Examinee:

JPMNumber: JPM-Pl (JPM-116) Revision: 5 Task

Title:

Transferring Computer UPS 480 V AC Main Power Supply System: Plant Process Computer Time Critical Task: DYES ~NO Validated Time (minutes):

Task Number(s): 083-01-030 Applicable To: SRO x STA RO x PEO x KIA Number: 062 A4.01 KIA Rating: - - -3.3/3.1-----

Method of Testing: Simulated Performance: x Actual Performance:

Location: Classroom: Simulator: In-Plant: x Task Standards: At the completion of this JPM, the examinee has transferred the computer UPS main power supply from Facility 1 to Facility 2.

Required Materials: OP 2349A, Plant Process Computer UPS System (procedures, equipment, etc.)

General

References:

OP 2349A, Plant Process Computer UPS System

      • READ TO THE EXAMINEE ***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

3

JPM WORKSHEET JPMNumber: JPM-Pl (JPM-116) Revision: 5 Initial Conditions:

  • The plant is at 100% power.
  • All systems are in a normal lineup.
  • The computer uninterruptible power supply is being supplied from Facility 1.
  • The Task Preview and Pre-job Brief have been completed.

Initiating Cues:

  • The Unit Supervisor has directed you to transfer the computer UPS main power supply from Facility 1 to Facility 2 in accordance with OP 2349A, Section 4.8.
  • The computer UPS main power supply is being swapped from Facility 1 to Facility 2 to support preventative maintenance on breaker B5238.

Simulator Requirements: NIA

        • NOTES TO TASK PERFORMANCE EVALUATOR****
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

4

PERFORMANCE INFORMATION JPMNumber: JPM-Pl (JPM-116) Revision: 5 Task

Title:

Transferring Computer UPS 480 V AC Main_Power §upply STARTTIME: ~~~-

STEP Performance: Standard: Critical: Grade

  1. 1 OP 2349A, Section 4.8 Examinee reads and acknowledges the Note. YD N[gj so uo CA UT ION With safety switches, NB-5238 and NB-6245 open, computer power is supplied from computer battery. When computer battery is supplying power, positive operator action must be taken within 90 minutes to place computer UPS back on UPS inverter or alternate source.

Cue: Provide examinee with a copy of OP 2349A, Plant Process Computer UPS System.

Comments:

STEP Performance: Standard: Critical: Grade

  1. 2 4.8.1 IF transferring main power supply from Examinee proceeds to the Control Room Air YD N[gj so uo Facility 1 to Facility 2, PERFORM the Conditioning Room and observes breaker B6245, following: "computer uninterruptible power supply," is in the
a. CHECK Facility 2 supply breaker, ON position.

B6245, "computer uninterruptible power supply," closed (CRAC room).

Cue: Breaker B6245 is in the ON (closed) position ..

Comments:

5

PERFORMANCE INFORMATION JPM Number: JPM-Pl (JPM-116) Revision: 5 Task

Title:

Transferring C()mputer UPS 480 V AC Main Power Supply STEP Performance: Standard: Critical: Grade

  1. 3
b. CHECK computer battery, DB4A, Examinee locates CB-1 on DSOA (West DC YON~ so uo aligned to inverter with CB-1 closed switchgear room) and observes that the breaker is (DSOA). in the ON position.

Cue: Breaker CB-1 is in the ON (closed) position.

Comments: This area may be Protected. The preferred method to complete this step is to get the Shift Managers permission to enter the Protected Area. A photo maybe used to complete this step as an alternate method.

STEP Performance: Standard: Critical: Grade

  1. 4
c. CHECK UPS not aligned to Examinee observes that the red "ALTERNATE YON~ so uo alternate source. SOURCE SUPPLYING LOAD" light on DSOA is NOT lit and I or the amber "INVERTER SUPPLYING LOAD" light is lit.

Cue: The red "ALTERNATE SOURCE SUPPLYING LOAD" light on DSOA is NOT lit and I or the amber "INVERTER SUPPLYING LOAD" light is lit.

Comments: This area may be Protected. The preferred method to complete this step is to get the Shift Managers permission to enter the Protected Area. A photo maybe used to complete this step as an alternate method.

6

PERFORMANCE INFORMATION JPMNumber: JPM-Pl (JPM-116) Revision: 5 Task

Title:

Transferring_!:;omput~r !JP~ 480 VAC Main Power Supply STEP Performance: Standard: Critical: Grade

  1. 5
d. PLACE safety switch, "computer Examinee proceeds to the East DC Switchgear Y[gj ND so uo power safety switch NB-5238," to Room and simulates placing switch NB-5238 to the "OFF" (East DC Switchgear "OFF" position.

Room).

Cue: Switch NB-523 8 has been placed in the "OFF" position.

Comments:

STEP Performance: Standard: Critical: Grade

  1. 6
e. TURN and REMOVE Kirk-Key for Examinee simulates turning and removing Kirk- Y[gj ND so uo safety switch, "computer power Key for safety switch "computer power safety safety switch, NB-5238", (East DC switch, NB-5238", (East DC Switchgear Room).

Switchgear Room).

Cue: Kirk-Key for safety switch NB-5238 has been turned and the key has been removed.

Comments:

STEP Performance: Standard: Critical: Grade

  1. 7
f. INSERT and TURN Kirk-key for Examinee proceeds to the West DC Switchgear Y[gj ND so uo safety switch, "computer power Room and simulates inserting the Kirk-key into safety switch, NB-6245" (West DC safety switch NB-6245.

Switchgear Room).

Examinee simulates turning Kirk-Key for safety Y[gj ND so uo switch NB-6245 ..

Cue: The kirk-key has been inserted and turned.

Comments:

7

PERFORMANCE INFORMATION JPM Number: JPM-Pl (JPM-116) Revision: 5 Task

Title:

Transferrin~omputer UP§_ 480 VA~ Ma!!J. ~_o'!er _§upply STEP Performance: Standard: Critical: Grade

  1. 8
g. PLACE safety switch, "computer Examinee simulates placing safety switch, Y~NO so uo power safety switch, NB-6245," to "computer power safety switch, NB-6245," to the "ON" (West DC Switchgear Room). "ON" position.

Cue: "Computer power safety switch, NB-6245," is in the "ON" position.

Comments:

STEP Grade Performance: Standard: Critical:

  1. 9
h. IF UPS inverter operating, Examinee observes the following: YON~ so uo OBSERVE the following (D50A):
  • Amber "IN SYNC" light, lit
  • Amber "IN SYNC" light is lit
  • Amber "INVERTER
  • Amber "INVERTER SUPPLYING LOAD" light is lit SUPPLYING LOAD" light lit
  • Red "BATTERY CURRENT"
  • Red "BATTERY CURRENT" light is NOT lit.

light not lit.

Cue:

  • Amber "IN SYNC" light is lit
  • Amber "INVERTER SUPPLYING LOAD" light is lit
  • Red "BATTERY CURRENT" light is NOT lit.

Comments: This area may be Protected. The preferred method to complete this step is to get the Shift Managers permission to enter the Protected Area. A photo maybe used to complete this step as an alternate method.

TERMINATION CUE: The evaluation for this JPM is concluded.

STOP TIME: _ __

8

VERIFICATION OF JPM COMPLETION JPMNumber: JPM-Pl (JPM-116) Revision: 5 Date Performed:

Student:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

EVALUATION SECTION:

Time Critical Task? D Yes [gj No Validated Time (minutes): 30 Actual Time to Complete (minutes):

I I Work Practice Performance: D SAT D UNSAT Operator Fundamentals: D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question # 1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:

Print I Sign Areas for Improvement I Comments:

9

STUDENT HANDOUT JPMNumber: JPM-Pl (JPM-116) Revision: 5 Initial Conditions:

  • The plant is at 100% power.
  • All systems are in a normal lineup.
  • The computer uninterruptible power supply is being supplied from Facility 1.
  • The Task Preview and Pre-job Brief have been completed.

Initiating Cues:

  • The Unit Supervisor has directed you to transfer the computer UPS main power supply from Facility 1 to Facility 2 in accordance with OP 2349A, Section 4.8.
  • The computer UPS main power supply is being swapped from Facility 1 to Facility 2 to support preventative maintenance on breaker B5238.

10

JOB PERFORMANCE MEASURE APPROVAL SHEET JPM

Title:

Swapping "B" Service Water Strainer from Facility 1 to Facility 2 JPMNumber: JPM-P2 Revision: 0 Initiated:

John W. Riley (Signature on File) 01/24/2017 Developer Date Reviewed:

Will Chesnutt (Signature on File) 01/27/2017 Technical Reviewer Date Approved:

Michael John Cote (Signature on File) 02/01/2017 Supervisor, Nuclear Training Date 1

SUMMARY

OF CHANGES DATE DESCRIPTION REV/CHANGE 01/24/2017 jwr Initial issue JPM. Similar to JPM-123. Written for the 2017 ILT 0 NRC JPM exam. JPM-123 used the operating procedure. This JPM uses the Loss of Vital 480 VAC Bus 22E AOP; 2503E.

2

JPM WORKSHEET Facility: MP2 Examinee:

JPMNumber: JPM-P2 Revision: - -

Task

Title:

Swapping "B" Service Water Strainer from Facility 1 to Facility 2 System: Service Water Time Critical Task: DYES k?S1 NO Validated Time (minutes):

Task Number(s): 000-04-018 Applicable To: SRO

-- x- STA RO x PEO x KIA Rating:

KIA Number: 076/A2.0l - - -3.5/3.7 Method of Testing: Simulated Performance: x Actual Performance:

Location: Classroom: Simulator: In-Plant: x Task Standards: At the completion of this JPM, the examinee has simulated swapping the "B" service water strainer power supply from Facility 1 to Facility 2.

Required Materials: AOP 2503E, Loss of Vital 480 V AC Bus 22E (procedures, equipment, etc.)

General

References:

AOP 2503E, Loss of Vital 480 V AC Bus 22E

      • READ TO THE EXAMINEE ***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

3

JPM WORKSHEET JPMNumber: JPM-P2 Revision: 0 Initial Conditions:

  • The plant is at 100% power.
  • A loss of 480 volt electrical bus 22E has occurred.
  • The crew has entered AOP 2503E, "Loss of Vital 480 VAC Bus 22E".
  • The crew is performing step 3 .18 to place the "B" SW pump in service on facility 1.
  • The crew has completed all steps through 3.18.e. The "B" SW pump is operating and the "A" SW pump has been stopped.

Initiating Cues:

  • The Unit Supervisor has directed you to swap the "B" service water strainer power supply from Facility 1 to Facility 2 in accordance with AOP 2503E, step 3.18.f.
  • The examiner will act as the US as needed.

Simulator Requirements: NIA

  • * * *NOTES TO TASK PERFORMANCE EVALU ATOR* * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

4

PERFORMANCE INFORMATION JPMNumber: JPM-P2 Revision: 0 Task

Title:

Swapping "B" Service Water Strainer from Facility 1 to Facility 2 START TIME: ----

STEP Performance: Standard: Critical: Grade

  1. 1 3 .18.f DISPATCH Operator to intake structure The examinee locates the "B" Service water Ycgj ND so uo to ENSURE "B" service water strainer Strainer control switch on the middle, left of the powered from facility 2, as follows: "B" Service Water Pump Discharge Strainer Control panel LIB (C58B), and simulates placing
1) PLACE "B" SW strainer control it to the "OFF" position.

switch to "OFF."

Cue: "B" SW strainer control switch is in "OFF" position.

Comments: The best way to administer this JPM is to have both the examiner and examinee stand on the floor using a flashlight and laser pointer. The examinee can climb the ladder and look at the panel but there is not enough room for the examinee and examiner on the platform. And it could be unsafe for the examinee to tum on the platform to communicate with the examiner.

STEP Performance: Standard: Critical: Grade

  1. 2
2) OPEN "Zl" knife switch. The examinee locates the "B" Service Water Ycgj ND so uo Strainer "Z l" knife switch on the right side of the "B" Service Water Pump Discharge Strainer Control panel LIB (C58B), and simulates placing it in the "OFF" position.

Cue: "Zl" knife switch is in the "OFF" position.

Comments:

5

PERFORMANCE INFORMATION JPMNumber: JPM-P2 Revision: 0 Task

Title:

Swapping~B" Service Water Strainer from Facility 1toFacility2 STEP Performance: Standard: Critical: Grade

  1. 3
3) ROTATE and REMOVE Kirk-key.
  • The examinee locates the Kirk-key in the lock Y[gj ND so uo for the Zl knife switch, and simulates rotating it 90° to lock the Zl knife switch.
  • Examinee simulates removing the Kirk-key . Y[gj ND so uo Cue: The Zl Kirk-key has been rotated and removed.

Comments:

STEP Performance: Critical: Grade Standard:

  1. 4
4) INSERT Kirk-key in Z2 lock. The examinee locates the Kirk-key lock for the Z2 Y[gj ND so uo knife switch and simulates inserting the Kirk-key into the Z2 lock.

Cue: The Kirk key has been inserted into the Facility 2 key lock switch.

Comments:

STEP Performance: Standard: Critical: Grade

  1. 5
5) UNLOCK and CLOSE Z2 knife The examinee simulates unlocking the Kirk key Y[gj ND so uo switch. lock for the Z2 knife switch, and simulates closing the Z2 knife switch ("ON" position).

Cue: The Z2 Kirk key switch is unlocked and the knife switch is closed ("ON" position).

Comments:

6

PERFORMANCE INFORMATION JPMNumber: JPM-P2 Revision: 0 Task

Title:

Swapping "B" S~rvi~e Water Strainer from Facility 1toFacility2 STEP Performance: Standard: Critical: Grade

  1. 6
6) PRESS "CLOSE" on strainer control The examinee simulates pressing "CLOSE" on Y[gj ND so uo panel (west side above Z2 knife strainer control panel (west side above Z2 knife switch). switch).

Cue: "CLOSE" on strainer control panel has been pressed.

Comments:

STEP Performance: Standard: Critical: Grade

  1. 7
7) PLACE "B" SW strainer control Examinee simulates placing "B" SW strainer Y[gj ND so uo switch in "AUTO." control switch in "AUTO.

Cue: The "B" SW strainer control switch is in "AUTO.

Comments:

TERMINATION CUE: The evaluation for this JPM is concluded.

STOP TIME: - - - -

7

VERIFICATION OF JPM COMPLETION JPM Number: JPM-P2 Revision: 0 Date Performed:

Student:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

EVALUATION SECTION:

Time Critical Task? 0 Yes ~No Validated Time (minutes): 10 Actual Time to Complete (minutes):

I I Work Practice Performance: D SAT D UNSAT Operator Fundamentals: D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question #1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:

Print I Sign Areas for Improvement I Comments:

8

STUDENT HANDOUT JPMNumber: JPM-P2 Revision: 0 Initial Conditions:

  • The plant is at 100% power.
  • A loss of 480 volt electrical bus 22E has occurred.
  • The crew has entered AOP 2503E, "Loss of Vital 480 VAC Bus 22E".
  • The crew is performing step 3 .18 to place the "B" SW pump in service on Facility 1.
  • The crew has completed all steps through 3 .18.e. The "B" SW pump is operating and the "A" SW pump has been stopped.

Initiating Cues:

  • The Unit Supervisor has directed you to swap the "B" service water strainer power supply from Facility 1 to Facility 2 in accordance with AOP 2503, step 3.18.f.
  • The examiner will act as the US as needed.

9

JOB PERFORMANCE MEASURE APPROVAL SHEET JPM

Title:

Shift from "A" to "B" Waste Gas Decay Tank JPMNumber: JPM-P3 (JPM-225) Revision: 2 Initiated:

John W. Riley (Signature on File) 1/18117 Developer Date Reviewed:

Will Chesnutt (Signature on File) 01/27/2017 Technical Reviewer Date Approved:

Michael John Cote (Signature on File) 02/01/2017 Supervisor, Nuclear Training Date 1

SUMMARY

OF CHANGES DATE DESCRIPTION REV/CHANGE 10/20/08 Revised JPM for LOIT 2008 NRC Exam 110 01102109 Incorporated NRC Post-Validation comments 1/0 01/17/2017 jwr Updated to the latest format in preparation for the 2017 NRC JPM 210 exam. Made changes due to procedure changes.

2

JPM WORKSHEET Facility: l\1P2 Examinee:

JPMNumber: JPM-P3 (JPM-225) Revision:

- 2/0 Task

Title:

Shift from "A" to "B" Waste Gas Decay Tank System: Gaseous Radwaste Time Critical Task: DYES ~NO Validated Time (minutes):

Task Number(s): 071-01-035 Applicable To: SRO

-- x- STA - - - - RO

-- x- PEO x KIA Number: 071 A4.05 KIA Rating: 2.6*/2.6*

Method of Testing: Simulated Performance: x Actual Performance:

Location: Classroom: Simulator: In-Plant: x Task Standards: At the completion of this JPM the examinee has shifted from the "A" Waste Gas Decay Tank in service to the "B" Waste Gas Decay Tank in service.

Required Materials: Waste Gas System, OP 2337, Section 4.2 (procedures, equipment, etc.)

General

References:

Waste Gas System, OP 2337, Section 4.2

      • READ TO THE EXAMINEE ***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as ifthe evolution was actually being performed.

3

JPM WORKSHEET JPMNumber: JPM-P3 (JPM-225) Revision: 2/0 Initial Conditions:

  • The "A" Waste Gas Decay Tank is in service.
  • The "A" Waste Gas Decay Tank pressure indicates 137 psig.
  • The "B" Waste Gas Decay Tank pressure indicates 5 psig.
  • All prerequisites are met.
  • The Task Preview and Pre-job Brief have been completed.

Initiating Cues: The US has directed you to remove the "A" Waste Gas Decay Tank from service and place the "B" Waste Gas Decay Tank in service.

Simulator Requirements: NIA

  • * **NOTES TO TASK PERFORMANCE EVALUATOR****
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

4

PERFORMANCE INFORMATION JPMNumber: JPM-P3 (JPM-2~5) Revision: 2/0 Task

Title:

Shift from "A" to "B" Waste Gas Decay Tank START TIME: _ _ __

STEP Performance: Standard: Critical: Grade

  1. 1 OP 2337, Section 4.2, NOTE: Examinee reads and acknowledges NOTE prior to YD N[gj so uo section 4.2, "Shifting Waste Gas Decay Tanks."
1. The following Section shifts any of the following waste gas decay tanks ("A" through "F"):
2. When using this Section, the last designator is written in the box next to the component's identification number on a copy of this Section.

Cue: Provide the examinee with OP 2337, Gaseous Radwaste System, prerequisites and precautions (pages 1-4) and section 4.2 Shifting Waste Gas Decay Tanks (pages 8-10).

Comments:

STEP Performance: Standard: Critical: Grade

  1. 2 OP 2337, Section 4.2, NOTE: Examinee reads and acknowledges NOTE at the YD N[gj so uo start of section 4.2, "Shifting Waste Gas Decay Waste Gas Decay Tanks are normally shifted Tanks."

when the gas pressure in the in service Waste Gas Decay Tank reaches 135 to 140 psig.

Cue:

Comments:

5

PERFORMANCE INFORMATION JPMNumber: JPM-P3 (JPM-225) Revision: 2/0 Task

Title:

Shift from "A" to "B" Waste Gas Decay Tank STEP Performance: Standard: Critical: Grade

  1. 3 4.2.1 MARK the boxes in step 4.2.6 with the letter designator of the valve identification Examinee records the letter "A" in the boxes YD N[8J so uo associated with step 4.2.6.

number of the Waste Gas Decay Tank being removed from service.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 4 4.2.2 MARK the boxes in step 4.2.8 with the Examinee records the letter "B" in the boxes YD N[8J so uo letter designator of the valve identification associated with step 4.2.8.

number of the Waste Gas Decay Tank which is to be placed in service.

Cue:

Comments:

6

PERFORMANCE INFORMATION JPM Number: JPM-P3 (JPM-225) Revision: 2/0 Task

Title:

Shift from "A" to "B" Waste Gas Decay Tank STEP Performance: Standard: Critical: Grade

  1. 5 4.2.3 CIRCLE position of Waste Gas Examinee locates the handswitches for the "A" and Y0Nl:8J so uo Compressor hand switches (C-61 ): "B" Waste Gas Compressors on Panel C-61 and records the position of the handswitches in the
  • HS-9188, "WASTE GAS appropriate space.

COMPRESSOR F-lA" OFF AUTO STANDBY

  • HS-9189, "WASTE GAS COMPRESSORF-lB" OFF AUTO STANDBY Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 6 4.2.4 WRlTE in-service Waste Gas Decay Tank Examinee writes in the in-service Waste Gas YD N(g] so uo pressure ps1g Decay Tank pressure as 137 psig. This was provided in the initial conditions.

Cue:

Comments:

7

PERFORMANCE INFORMATION JPM Number: JPM-P3 (JPM-225) Revision: 2/0 Task

Title:

Shift from "A" to "B" Waste Gas Decay Tank STEP Performance: Standard: Critical: Grade

  1. 7 4.2.5 ENSURE the following in "OFF" (C-61): Examinee states he/she would place both "A" and Y~NO so uo "B" Waste Gas Compressor handswitches in the
  • HS-9188, "WASTE GAS OFF position.

COMPRESSOR F-lA"

  • HS-9189, "WASTE GAS COMPRESSOR F-lB" Cue: Both Waste Gas Compressor handswitches are in the OFF position.

Comments:

8

PERFORMANCE INFORMATION JPMNumber: JPM-P3 (JPM-225) Revision: 2/0 Task

Title:

Shift from "A" to "B" Waste Gas Decay Tank STEP Performance: Standard: Critical: Grade

  1. 8 4.2.6 For Waste Gas Decay Tank being removed
  • Examinee locates the "WASTE GAS DECAY Y~NO so uo from service, CLOSE the following valves: TANK INLET VALVE, 2-GR-6.lA handswitch and states he/she would rotate it to
  • 2-GR-6.lA, "DECAY TK (T-19A) the CLOSE position.

INLET VALVE"(C-61)

  • 2-GR-6A, "A DECAY TANK INLET
  • Examinee locates the "A" Decay Tank Inlet YON~ so uo Stop, 2-GR-6A and states he/she would rotate STOP" (-25'6" Auxiliary Building) it in the clockwise direction until the
  • 2-GR-7A, "A DECAY TANK INLET" handwheel stops.
  • Examinee locates the "A" Decay Tank Inlet, 2- Y~NO so uo GR-7A, and states he/she would rotate it in the clockwise direction until the handwheel stops.

Cue:

  • When the examinee states that he/she is rotating the handswitch for 2-GR-6.lA to the closed position, inform examinee that the red light is NOT lit and the green light is lit.
  • When the examinee states that he/she is rotating the handle for 2-GR-6A and 2-GR-7A, then inform him/her that the valve position indicator is pointing to the CLOSE position.

Comments:

  • All of the manual valve handles rotate 90° and have a pointer for valve position.
  • The handles for each of the manual valves may be oriented differently depending on local interference.
  • 2-GR-7A mark number matches, but noun name does not match on permanent label. A temporary label (pink tag) is in place for a 100% match while the new permanent label is being made.

9

PERFORMANCE INFORMATION JPM Number: JPM-P3 (JPM-225) Revision: 2/0 Task

Title:

Shift from "A" to "B" Waste Gas Decay Tank STEP Perfonnance: Standard: Critical: Grade

  1. 9 4.2. 7 WRITE time decay tank isolated. Examinee writes in the time decay tank isolated. YD N[8J so uo Cue:

Comments:

10

PERFORMANCE INFORMATION JPM Number: JPM-P3 (JPM-225) Revision: 2/0 Task

Title:

Shift from "A" to "B" Waste Gas Decay Tank STEP Perfo1mance: Standard: Critical: Grade

  1. 10 4.2.8 PLACE applicable Waste Gas Decay Tank in service as follows:
  • Examinee locates and states he/she would YD N[2J so uo attempt to rotate the "B" Decay tank outlet
a. ENSURE the following valves closed: isolation, 2-GR-8B, in the clockwise (close) direction and determines that the handle will
  • 2-GR-8a, "a DECAY TANK NOT move.

OUTLET ISOLATION" (-25'6" Auxiliary Building)

  • Examinee locates and states he/she would YD N[2J so uo attempt to rotate the "B" Decay tank outlet
  • 2-GR-9a, "a DECAY TANK stop, 2-GR-9B, in the clockwise (close)

OUTLET STOP" (-25'6" Auxiliary direction and determines that the handle will Building) NOT move.

  • Examinee locates and observes that the YD N[2J so uo
  • 2-GR-8.lI!, "DECAY TK (T-19R) associated red light for the "B" DECAY OUTLET VALVE" (C-61) TANK OUTLET CONTROL VALVE, 2-GR-
b. OPEN the following valves: 8. IB is out and the green light is lit.
  • 2-GR-6.lI!, "DECAY TK (T-19R)
  • Examinee locates and states he/she would Y[2J ND so uo place the "B" Decay tank inlet valve, 2-GR-INLET VALVE" (C-61) 6.IB, handswitch to the OPEN position.
  • 2-GR-6!1 "a DECAY TANK INLET
  • Examinee locates and states he/she would Y[2J ND so uo STOP" -25'6" Auxiliary Building) rotate the "B" Decay Tank Inlet Stop, 2-GR-6B, in the counter clockwise (open) direction
  • 2-GR-7a, "a DECAY TANK INLET" until the handle stops.
  • Examinee locates and states he/she would Y[2J ND so uo rotate the "B" Decay Tank Inlet valve, 2-GR-7B, in the counter clockwise (open) direction until the handle stops.

Cue: For each of the above listed valves, when the examinee states that he/she is rotating a handswitch or a valve handle, then inform him/her that the valves are in the appropriate position or that the appropriate lights are lit as stated in the Standard.

Comments: 2-GR-7B mark number matches, but noun name does not match on permanent label. A temporary label (pink tag) is in place for a 100% match while the new permanent label is being made.

11

PERFORMANCE INFORMATION JPM Number: JPM-P3 (JPM-225) Revision: 2/0 Task

Title:

Shift from "A" to "B" Waste Gas Decay Tank STEP Performance: Standard: Critical: Grade

  1. 11 4.2.9 PLACE Waste Gas Compressor switches to Examinee places the handswitches for the "A" and YON~ so uo position marked in step 4.2.3. "B" Waste Gas Compressors on Panel C-61 back to the position recorded in step 4.2.3.

Cue: Inform examinee that the appropriate lights are lit.

Comments:

TERMINATION CUE: The evaluation for this JPM is concluded.

STOP TIME: _ __

12

VERIFICATION OF JPM COMPLETION JPMNumber: JPM-P3 (JPM-225) Revision: 2/0 Date Performed:

Student:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

EVALUATION SECTION:

Time Critical Task? D Yes ~No Validated Time (minutes):

I 25 Actual Time to Complete (minutes):

I Work Practice Performance: D SAT D UNSAT Operator Fundamentals: D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question # 1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:

Print I Sign Areas for Improvement I Comments:

13

STUDENT HANDOUT JPMNumber: P3 (JPM-225) Revision: 2/0 Initial Conditions:

  • The "A" Waste Gas Decay Tank is in service.
  • The "A" Waste Gas Decay Tank pressure indicates 137 psig.
  • The "B" Waste Gas Decay Tank pressure indicates 5 psig.
  • All prerequisites are met.
  • The Task Preview and Pre-job Brief have been completed.

Initiating Cues: The US has directed you to remove the "A" Waste Gas Decay Tank from service and place the "B" Waste Gas Decay Tank in service.

14

JOB PERFORMANCE MEASURE APPROVAL SHEET JPM

Title:

Local Manual Operation of a FRV JPMNumber: JPM-P4 Revision: 0/0 Initiated:

John W. Riley (Signature on File) 1/30/2017 Developer Date Reviewed:

Will Chesnutt (Signature on File) 1/3112017 Technical Reviewer Date Approved:

Michael John Cote (Signature on File) 2/2/2017 Supervisor, Nuclear Training Date 1

SUMMARY

OF CHANGES DATE DESCRIPTION REV/CHANGE 01125/2017 rlc Created from JPM-063 for 2017 NRC Re-Take Exam 010 2

JPM WORKSHEET Facility: MP2 Examinee:

JPMNumber: JPM-P4 Revision: 0/0 Task

Title:

Local Manual Operation of a FRV System: Main Feedwater (Steam Generator)

Time Critical Task: D YES 1:8:1 NO Validated Time (minutes):

Task Number(s): 059-01-038 Applicable To: SRO

-- x- STA


RO

-- x- PEO KIA Number: 035/A4.0l KIA Rating: 3.713.6 Method of Testing: Simulated Performance: x Actual Performance:

Location: Classroom: Simulator: In-Plant: x Task Standards: Examinee has simulated taking local manual control of the # 1 Feedwater Regulating Valve per OP 2385.

Required Materials: AOP 2504C Loss of 120 VAC Vital Instrument Panel VA-10 (procedures, equipment, etc.) OP 2385 "Feedwater Control system Operation" General

References:

AOP 2504C Loss of 120 VAC Vital Instrument Panel VA-10 OP 2385 "Feedwater Control system Operation"

      • READ TO THE EXAMINEE ***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. With the exception of the questions at the end, you may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

3

JPM WORKSHEET JPMNumber: JPM-P4 Revision: 0/0 Initial Conditions:

  • The plant is at 100 % power, steady state.
  • V A-10 has de-energized due to a failure of the panel's main breaker.
  • Electrical Maintenance is investigating the breaker failure.

Initiating Cues:

  • The US has directed you to establish communications with the control room and take local manual control of the #1 FRV in accordance with OP 2385 "Feedwater Control System Operation".
  • Simulate that you have an ASCOM phone and Headset with you.
  • TSAS 3.7.1.6 "Main Feedwater Isolation Components" has been entered.
  • All of OP 2385 prerequisites are met except for Vital Instrument power from VAlO.
  • Step 4.7.2 has been completed by the control room. The controllers are properly configured. "REG VLV, LIC-5268" and "MSTR, LIC-5272" controllers are in manual and "BYPASS, LIC-5215" is in "AUTO".

Simulator Requirements:

        • NOTES TO TASK PERFORMANCE EVALUATOR****
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

4

PERFORMANCE INFORMATION JPMNumber: JPM-P4 Revision: 0/0 Task

Title:

Local Manual Operation of a FRV STARTTIME: ~~~-

STEP Performance: Standard: Critical: Grade

  1. 1 OP 2385 2 "Feedwater Control System Examinee reads and acknowledges the CAUTION. YON~ so uo 0Qeration" 4.7 Local Operation of No. 1 FRV CAUTION
1. To remain within the Main Steam Line Break inside Containment analysis, operation with FRY bypass valve(s) open when greater than 25% power is not allowed.
2. During this mode of operation, the FRY override from "TURBINE TRIP" or "HI-HI SG LEVEL" signal does not function.

Cue: Provide a copy of OP 2385, "Feedwater Control System Operation"; index, prerequisites, and precaution (through page 7) and section 4.7, "Local Operation of No. 1 FRY".

Comments:

STEP Performance: Standard: Critical: Grade

  1. 2 NOTE Examinee reads and acknowledges the Note. YON~ so uo This Section is required when malfunctions occur which prevent movement of No. 1 FRY from the Control Room and operation of the Feedwater System*is required.

Cue:

Comments:

5

PERFORMANCE INFORMATION JPM Number: JPM-P4 Revision: 0/0 Task

Title:

Local Manual Operation of a FRV STEP Performance: Standard: Critical: Grade

  1. 3 4.7.1 IF in MODEs 1, 2, or 3, ENTER TSAS Examinee notes that the initiating cue stated that YD N[g] so uo 3.7.1.6. TSAS 3. 7 .1.6 has been entered.

Cue:

Comments:

STEP Perfonnance: Standard: Critical: Grade

  1. 4 4.7.2 ENSURE the following (C-05): Examinee notes that the initiating cue stated that YD N[g] so uo Step 4.7.2 has been completed by the control room.
  • "REG VLV, LIC-5268," controller in manual (red light, lit)
  • "MSTR, LIC-5272," controller in manual (red light, lit)
  • "BYPASS, LIC-5215," controller in "AUTO" (green light, lit)

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 5 4.7.3 STATION Operator at 2-FW-5 lA, "#1 Examinee proceeds to the FRV area and states that YD N[g] so uo S/G FEED REG VALVE," and they would contact the control room on their ESTABLISH communications ASCOM phone.

(54' 6" TB).

Cue: Communications with Control room established. *BOP is on the line.

Comments:

6

PERFORMANCE INFORMATION JPMNumber: JPM-P4 Revision: 0/0 Task

Title:

Local Manual Operation of a FRV STEP Performance: Standard: Critical: Grade

  1. 6 4.7.4 At 2-FW-51A, "#1 SIG FEED REG Examinee simulates removing the handwheel YcgjN0 so uo VALVE," PERFORM the following anti- rotational restraint or states they would (54' 6" TB): remove the handwheel anti- rotational restraint.
a. REMOVE handwheel anti- rotational restraint.

Cue: Restraining device is removed.

Comments:

STEP Performance: Standard: Critical: Grade

  1. 7 CAUTION Examinee reads and acknowledges the Caution Y0Ncgj so uo Feed Regulating valve may move in the closed direction when engaging the large manual handwheel.

Cue:

Comments:

STEP Performance: Standard: Critical: Grade

  1. 8 4.7.4 At 2-FW-51A, "#1 SIG FEED REG Y0N0 so uo VALVE," PERFORM the following Examinee simulates turning the large handwheel (54 6" TB): for 2-FW-5 lA in the clockwise direction until it
b. TURN large handwheel clockwise to will not turn any further or states that they would its limit of travel. turn the large handwheel for 2-FW-51A in the clockwise direction until it will not turn any further.

Cue: Large handwheel for 2-FW-51A rotated clockwise to hard stop.

Comments:

7

PERFORMANCE INFORMATION JPM Number: JPM-P4 Revision: 0/0 Task

Title:

Local Manual Operation of a FRV STEP Performance: Standard: Critical: Grade

  1. 9 4.7.4 At 2-FW-51A, "#1 SIG FEED REG VALVE," PERFORM the following Examinee simulates turning the small handwheel in YC8] ND so uo the counter-clockwise direction until it will not tum (54 6" TB): any further or states that they would tum the small
c. TURN small handwheel handwheel in the counter-clockwise direction until counterclockwise until tight, locking it will not tum any further.

large handwheel in "engaged" position.

Cue: Small handwheel turned counterclockwise and is tight (large handwheel is locked in engaged position).

Comments:

STEP Performance: Standard: Critical: Grade

  1. 10 4.7.4 At 2-FW-51A, "#1 SIG FEED REG Examinee locates 2-FW-39A and simulates turning YC8] ND so uo VALVE," PERFORM the following its knob counterclockwise until it will not tum any (54 6" TB): further or states that they would open it by turning
d. OPEN 2-FW-39A, "'A' FEED its knob counterclockwise until it will not tum any REGULATING EQUALIZING STOP." further.

Cue: FW-39A, FEED REGULATING EQUALIZING STOP, is open.

Comments:

STEP Performance: Standard: Critical: Grade

  1. 11 4.7.5 As directed by Control Room, Examinee informs the control room 2-FW-51A is YD NC8] so uo OPERATE No. 1 FRY large handwheel in Local-Manual control, standing by for direction.

and MAINTAIN No. 1 SG level within desired operating band.

Cue: As BOP, acknowledge that #1 FRY is in local manual and instruct examinee to standby for instructions. This completes the JPM.

Comments:

TERMINATION CUE: The evaluation for this JPM is concluded.

STOP TIME: - - -

8

VERIFICATION OF JPM COMPLETION JPMNumber: JPM-P4 Revision: 0/0 Date Performed:

Student:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

EVALUATION SECTION:

Time Critical Task? D Yes [gj No Validated Time (minutes): 15 Actual Time to Complete (minutes):

I I Work Practice Performance: D SAT D UNSAT Operator Fundamentals: D SAT D UNSAT JPM Question Portion Overall [NLO only]: D SAT D UNSAT D N/A Attached Question # 1 D SAT D UNSAT Attached Question #2 D SAT D UNSAT Overall Result of JPM: D SAT D UNSAT Evaluator:

Print I Sign Areas for Improvement I Comments:

9

STUDENT HANDOUT JPMNumber: JPM-P4 Revision: 0/0 Initial Conditions:

  • The plant is at 100 % power, steady state.
  • V A-10 has de-energized due to a failure of the panel's main breaker.
  • Electrical Maintenance is investigating the breaker failure.

Initiating Cues:

  • The US has directed you to establish communications with the control room and take local manual control of the #1 FRV in accordance with OP 2385 "Feedwater Control System Operation".
  • Simulate that you have an ASCOM phone and Headset with you.
  • TSAS 3.7.1.6 "Main Feedwater Isolation Components" has been entered.
  • All of OP 23 85 prerequisites are met except for Vital Instrument power from VAlO.
  • Step 4.7.2 has been completed by the control room. The controllers are properly configured. "REG VLV, LIC-5268" and "MSTR, LIC-5272" controllers are in manual and "BYPASS, LIC-5215" is in "AUTO".

10