{{#Wiki_filter:JPM407_R02 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure Complete an SRV Actuation Report JPM Number: JPM407 Revision Number: 0 2 Date: 8/2 5/16 Developed By:
{{#Wiki_filter:CLINTON POWER STATION Job Performance Measure Complete an SRV Actuation Report JPM Number: JPM407 Revision Number: 02 Date: 8/25/16 Developed By:         T. Jennings                         8/25/16 Instructor                         Date Validated By:         Michael Antonelli                   10/26/16 SME or Instructor                   Date Reviewed By:         Jim Lucas                           11/15/16 Operations Representative           Date Approved By:         Tony Jennings                       11/15/16 Training Department                 Date JPM407_R02 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111
T. Jennings 8/2 5/16   Instructor Date Validated By:
 
Michael Antonelli 10/26/16   SME or Instructor Date Reviewed By:
JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Jim Lucas 11/15/16   Operations Representative Date Approved By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Tony Jennings 11/15/16   Training Department Date JPM Number: JPM407 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
Page 2 of 18 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
(*).
Procedure CPS 3831.01 Rev: 6b Procedure CPS 3831.01D002 Rev: 6 Procedure CPS 3831.01F001 Rev: 4 ________ 9. Verify cues both verbal and visual are free of conflict.
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 10. Verify performance time is accurate
Procedure CPS 3831.01               Rev: 6b Procedure CPS 3831.01D002           Rev: 6 Procedure CPS 3831.01F001           Rev: 4
________ 11. If the JPM cannot be performed as written with proper responses, then revise the  
________     9. Verify cues both verbal and visual are free of conflict.
________     10. Verify performance time is accurate
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date Page 2 of 18


JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Revision Record (Summary)
Revision  Date                            Description 00      NA    New JPM number and updated revisions (10110001SAF01) 01    2/22/11 Updated for procedure revision.
02    8/23/16 Updated procedure references and made editorial changes throughout.
Page 3 of 18


SME / Instructor Date SME / Instructor Date SME / Instructor Date JPM Number: JPM407 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 18 Revision Record (Summary)
Simulator Setup Instructions
Revision Date Description 00 NA New JPM number and updated revisions (10110001SAF01) 01 2/22/11 Updated for procedure revision.
02 8/23/16 Updated procedure references and made editorial changes throughout
.
JPM Number:  JPM407 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
Page 4 of 18 Simulator Setup Instructions
: 1. No simulator setup is required for this JPM.
: 1. No simulator setup is required for this JPM.
Page 4 of 18


JPM Number: JPM407 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 18 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
TASK STANDARDS:
* The SRV actuation report is correctly filled out and SRV B21-F047A has been identified as leaking. TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* The SRV actuation report is correctly filled out and SRV B21-F047A has been identified as leaking.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* None PROCEDURAL/
* None PROCEDURAL/


Line 60: Line 63:
* Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
* Provide the examinee with the following items:
* Provide the examinee with the following items:
o Initial Conditions and Initiating Cue page (page 1 4 of the JPM) o SRV Tailpipe Temperature Graph (page 1 5 of the JPM) o DCS Display 6D
o Initial Conditions and Initiating Cue page (page 14 of the JPM) o SRV Tailpipe Temperature Graph (page 15 of the JPM) o DCS Display 6D-04 (page 16 of the JPM) o DCS Display D05AD1 (page 17 of the JPM) o DCS Display DD5BD3 (page 18 of the JPM) o CPS 3831.01 Safety Relief Valve Report Rev. 6b (blank) o CPS 3831.01D002 Actuation Log Rev. 6 (with block 310 marked NA) o CPS 3831.01F001 Comment Sheet Rev. 4 (blank)
-04 (page 1 6 of the JPM) o DCS Display D05AD1 (page 1 7 of the JPM) o DCS Display DD5BD3 (page 1 8 of the JPM) o CPS 3831.01 Safety Relief Valve Report Rev. 6b (blank) o CPS 3831.01D002 Actuation Log Rev. 6 (with block 310 marked NA) o CPS 3831.01F001 Comment Sheet Rev. 4 (blank)
* All pre-job briefings are completed.
* All pre-job briefings are completed.
Page 5 of 18


JPM Number: JPM407 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 18  INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are the 'B' RO on dayshift.
You are the B RO on dayshift.
The unit is operating at 80% power.
The unit is operating at 80% power.
CPS 9056.02 SAFETY/RELIEF VALVE ACTUATION TEST was performed on B21
CPS 9056.02 SAFETY/RELIEF VALVE ACTUATION TEST was performed on B21-F047A on the previous shift (midshift) during steady state operations.
-F047A on the previous shift (midshift) during steady state operations.
During the test, B21-F047A was opened at 0027 for 1 minute 0 seconds.
During the test, B21
-F047A was opened at 0027 for 1 minute 0 seconds.
INITIATING CUE:
INITIATING CUE:
CAUTION § All pre-job briefings are completed. § Do NOT shine any type light into a panel.
CAUTION
                § All pre-job briefings are completed.
                § Do NOT shine any type light into a panel.
The CRS has provided you with the following data sheets:
The CRS has provided you with the following data sheets:
* SRV B21-F047A tailpipe temperature graph
* SRV B21-F047A tailpipe temperature graph
* Pre-test and Post
* Pre-test and Post-test screen shots of PPC screens 6D-04 (IRM/APRM indications), D05AD1 (SPDS Summary Display), and DD5BD3 (SPDS RPV, Pri-Cnmt, and Hydrogen Display)
-test screen shots of PPC screens 6D
-04 (IRM/APRM indications), D05AD1 (SPDS Summary Display), and DD5BD3 (SPDS RPV, Pri
-Cnmt, and Hydrogen Display)
The CRS has marked block 310 of CPS 3831.01D002 Actuation Log NA.
The CRS has marked block 310 of CPS 3831.01D002 Actuation Log NA.
The CRS has directed you to complete CPS 3831.01 Safety Relief Valve Report for 1B21
The CRS has directed you to complete CPS 3831.01 Safety Relief Valve Report for 1B21-F047A.
-F047A. START TIME:
START TIME:
Page 6 of 18


JPM Number: JPM407 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 7 of 18 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 3831.01 Safety Relief Valve Report Section 8.0 Procedure CPS 3831.01D002 Actuation Log JPM Step 1 Fill in block 302 of CPS 3831.01D002, ACTUATION LOG.
PERFORMANCE STEPS CPS 3831.01 Safety Relief Valve Report Section 8.0 Procedure CPS 3831.01D002 Actuation Log JPM Step 1     Fill in block 302 of CPS 3831.01D002, ACTUATION LOG.
Standard: Examinee records "B21
Standard:           Examinee records B21-F047A in block 302.
-F047A" in block 302
Cue:
. Cue: Comments   SAT   £ UNSAT   £ Comment Number JPM Step 2 Fill in block 303 of CPS 3831.01D002, ACTUATION LOG.
Comments SAT £             UNSAT £                 Comment Number JPM Step 2     Fill in block 303 of CPS 3831.01D002, ACTUATION LOG.
Standard: Examinee records today's date in block 303.
Standard:           Examinee records todays date in block 303.
Cue: Comments   SAT   £ UNSAT   £ Comment Number
Cue:
Comments SAT £             UNSAT £                 Comment Number Page 7 of 18


JPM Number: JPM407 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 8 of 18  JPM Step 3 Fill in block 304 of CPS 3831.01D002, ACTUATION LOG.
JPM Step 3 Fill in block 304 of CPS 3831.01D002, ACTUATION LOG.
Standard: Examinee records "0 027" in block 304.
Standard:     Examinee records 0027 in block 304.
Cue: Comments   SAT   £ UNSAT   £ Comment Number
Cue:
  *JPM Step 4 Fill in block 30 5 of CPS 3831.01D002, ACTUATION LOG.
Comments SAT £             UNSAT £             Comment Number
Standard: Examinee records "B" in block 305.
  *JPM Step 4 Fill in block 305 of CPS 3831.01D002, ACTUATION LOG.
Cue: Comments   SAT   £ UNSAT   £ Comment Number
Standard:     Examinee records B in block 305.
  *JPM Step 5 Fill in block 30 6 of CPS 3831.01D002, ACTUATION LOG.
Cue:
Standard: Examinee records "C" in block 306.
Comments SAT £             UNSAT £             Comment Number
Cue: Comments   SAT   £ UNSAT   £ Comment Number
  *JPM Step 5 Fill in block 306 of CPS 3831.01D002, ACTUATION LOG.
Standard:     Examinee records C in block 306.
Cue:
Comments SAT £             UNSAT £             Comment Number Page 8 of 18


JPM Number: JPM407 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 9 of 18  *JPM Step 6 Fill in block 30 7 of CPS 3831.01D002, ACTUATION LOG.
  *JPM Step 6 Fill in block 307 of CPS 3831.01D002, ACTUATION LOG.
Standard: Examinee records "E" in block 307.
Standard:     Examinee records E in block 307.
Cue: Comments   SAT   £ UNSAT   £ Comment Number JPM Step 7 Fill in block 308 of CPS 3831.01D002, ACTUATION LOG.
Cue:
Standard: Examinee records "80%" in block 308.
Comments SAT £               UNSAT £                 Comment Number JPM Step 7 Fill in block 308 of CPS 3831.01D002, ACTUATION LOG.
Cue: Comments   SAT   £ UNSAT   £ Comment Number
Standard:     Examinee records 80% in block 308.
  *JPM Step 8 Fill in block 309 of CPS 3831.01D002, ACTUATION LOG.
Cue:
Standard: Examinee determines that the tailpipe temperature for B21
Comments SAT £               UNSAT £                 Comment Number
-F047A has not returned to normal or that the SRV is leaking. Block 309 may be left blank or N/A'd.
  *JPM Step 8 Fill in block 309 of CPS 3831.01D002, ACTUATION LOG.
Cue: If the examinee determines that the tailpipe has not returned to normal or that the SRV is leaking, as the CRS instruct the examinee to leave the block blank if questioned and continue
Standard:     Examinee determines that the tailpipe temperature for B21-F047A has not returned to normal or that the SRV is leaking. Block 309 may be left blank or N/Ad.
. Comment s The critical portion of this step is the determination that B21
Cue:           If the examinee determines that the tailpipe has not returned to normal or that the SRV is leaking, as the CRS instruct the examinee to leave the block blank if questioned and continue.
-F047A tailpipe temperature has not returned to normal value, not recording a data value.
Comments      The critical portion of this step is the determination that B21-F047A tailpipe temperature has not returned to normal value, not recording a data value.
SAT   £ UNSAT   £ Comment Number
SAT £               UNSAT £                 Comment Number Page 9 of 18


JPM Number: JPM407 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 10 of 18 JPM Step 9 Fill in block 3 10 of CPS 3831.01D002, ACTUATION LOG.
JPM Step 9 Fill in block 310 of CPS 3831.01D002, ACTUATION LOG.
Standard: No examinee action required  
Standard:     No examinee action required - block is already filled in.
- block is already filled in.
Cue:
Cue: Comments   SAT   £ UNSAT   £ Comment Number JPM Step 10 Fill in block 3 11 of CPS 3831.01D002, ACTUATION LOG.
Comments SAT £               UNSAT £               Comment Number JPM Step 10 Fill in block 311 of CPS 3831.01D002, ACTUATION LOG.
Standard: Examinee records "1013" in block 311.
Standard:     Examinee records 1013 in block 311.
Cue: Comments   SAT   £ UNSAT   £ Comment Number JPM Step 11 Fill in block 3 12 of CPS 3831.01D002, ACTUATION LOG.
Cue:
Standard: Examinee records "1013" in block 312.
Comments SAT £               UNSAT £               Comment Number JPM Step 11 Fill in block 312 of CPS 3831.01D002, ACTUATION LOG.
Cu e: If the examinee requests the reseat pressure value, cue him/her that the valve reseated at the pressure indicated on the post test SPDS summary screen.
Standard:     Examinee records 1013 in block 312.
Comments   SAT   £ UNSAT   £ Comment Number
Cue:           If the examinee requests the reseat pressure value, cue him/her that the valve reseated at the pressure indicated on the post test SPDS summary screen.
Comments SAT £               UNSAT £               Comment Number Page 10 of 18


JPM Number: JPM407 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 11 of 18  JPM Step 12 Fill in block 3 13 of CPS 3831.01D002, ACTUATION LOG.
JPM Step 12 Fill in block 313 of CPS 3831.01D002, ACTUATION LOG.
Standard: Examinee records "1 minute 0 seconds" in block 313.
Standard:     Examinee records 1 minute 0 seconds in block 313.
Cue: If the examinee requests the duration time for the actuation of B21
Cue:           If the examinee requests the duration time for the actuation of B21-F047A, cue him/her that B21-F047A was open for 1 minute 0 seconds.
-F047A, cue him/her that B21-F047A was open for 1 minute 0 seconds.
Comments SAT £             UNSAT £               Comment Number JPM Step 13 Fill in block 314 of CPS 3831.01D002, ACTUATION LOG.
Comments   SAT   £ UNSAT   £ Comment Number JPM Step 13 Fill in block 3 14 of CPS 3831.01D002, ACTUATION LOG.
Standard:     Examinee records A and/or E in block 314.
Standard: Examinee records "A" and/or "E" in block 314.
Cue:
Cue: Comments   SAT   £ UNSAT   £ Comment Number JPM Step 14 Fill in block 3 15 of CPS 3831.01D002, ACTUATION LOG. Standard: Examinee records "N/A" in block 315.
Comments SAT £             UNSAT £               Comment Number JPM Step 14 Fill in block 315 of CPS 3831.01D002, ACTUATION LOG.
Cue: As the CRS, cue the examinee to record "N/A" in block 315.
Standard:     Examinee records N/A in block 315.
Comments   SAT   £ UNSAT   £ Comment Number
Cue:           As the CRS, cue the examinee to record N/A in block 315.
Comments SAT £             UNSAT £               Comment Number Page 11 of 18


JPM Number: JPM407 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 12 of 18  JPM Step 15 If CPS 3831.01F001 Comment Sheet is completed for this log entry, indicate "YES" IN BLOCK 316. If not completed, indicate "NO" in block 316.
JPM Step 15   If CPS 3831.01F001 Comment Sheet is completed for this log entry, indicate YES IN BLOCK 316. If not completed, indicate NO in block 316.
Standard: Examinee records "Yes" or "No" in block 316.
Standard:         Examinee records Yes or No in block 316.
Cue: Comments If the examinee records "Yes" in block 316, an entry in CPS 3831.01F001 Comment Sheet should be made.
Cue:
SAT   £ UNSAT   £ Comment Number JPM Step 16 Examinee completes CPS 3831.01D002 Actuation Log.
Comments         If the examinee records Yes in block 316, an entry in CPS 3831.01F001 Comment Sheet should be made.
Standard: Examinee records his/her signature and date in the "Completed By" blanks and provides the completed CPS 3831.01D002 Actuation Log to Shift Supervision for review. Cue: Cue the examinee that the JPM is complete.
SAT £             UNSAT £             Comment Number JPM Step 16   Examinee completes CPS 3831.01D002 Actuation Log.
Comments   SAT   £ UNSAT   £ Comment Number TERMINATING CUES:
Standard:         Examinee records his/her signature and date in the Completed By blanks and provides the completed CPS 3831.01D002 Actuation Log to Shift Supervision for review.
Cue:             Cue the examinee that the JPM is complete.
Comments SAT £             UNSAT £             Comment Number TERMINATING CUES:
The JPM is complete when the student has delivered CPS 3831.01F001 Comment Sheet to Shift Supervision for review.
The JPM is complete when the student has delivered CPS 3831.01F001 Comment Sheet to Shift Supervision for review.
STOP TIME:
STOP TIME:
Page 12 of 18
 
JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
 
==Title:==
£ EO              £ RO                £ SRO            £ STA          £ SRO Cert JPM


JPM Number:  JPM407 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
==Title:==
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Complete an SRV Actuation Report JPM Number:     JPM407                                                        Revision Number: 02 Task Number and
Page 13 of 18 Operator's Name:
 
Job Title:
==Title:==
£  EO £  RO £  SRO £  STA £  SRO Cert JPM Title:
383101.01, Complete Control Room actions to document data on failures and actuation's of the Safety Relief Valves in the Main Steam System and to generate reports required by the Nuclear Regulatory Commission K/A System         K/A Number                     Importance (RO/SRO)
Complete an SRV Actuation Report JPM Number:
Generic             2.1.18                     3.6                 3.8 Ability to make accurate, clear, and concise logs, records, status boards, and reports.
JPM 4 07 Revision Number:
Suggested Testing Environment:               Classroom Actual Testing Environment:               £ Simulator             £ Plant         £ Control Room Testing Method:         £ Simulate                     Alternate Path:       £ Yes       ¢ No
0 2 Task Number and Title:
                          ¢ Perform                           SRO Only:       £ Yes       ¢ No Time Critical:       £ Yes           ¢ No Estimated Time to Complete:           18 minutes                 Actual Time Used:             minutes
383101.01, Complete Control Room actions to document data on failures and actuation's of the Safety Relief Valves in the Main Steam System and to generate reports required by the Nuclear Regulatory Commission K/A System K/A Number Importance (RO/SRO)
Generic 2.1.18 3.6 3.8 Ability to make accurate, clear, and concise logs, records, status boards, and reports
. Suggested Testing Environment:
Classroom Actual Testing Environment:
£   Simulator £ Plant £ Control Room Testing Method:
£ Simulate Alternate Path:
£ Yes ¢ No   ¢ Perform SRO Only: £ Yes ¢ No Time Critical:
£ Yes ¢ No Estimated Time to Complete:
18 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 176: Line 183:


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                 £ Yes       £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             £ Satisfactory             £ Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                             (Print)
£ Yes £ No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Signature:                                                              Date:
£ Satisfactory
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            Page 13 of 18
£ Unsatisfactory Comments:
 
Evaluator's Name:
(Print)   Evaluator's Signature:
Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 14 of 18  INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are the 'B' RO on dayshift.
You are the B RO on dayshift.
The unit is operating at 80% power.
The unit is operating at 80% power.
CPS 9056.02 SAFETY/RELIEF VALVE ACTUATION TEST was performed on B21
CPS 9056.02 SAFETY/RELIEF VALVE ACTUATION TEST was performed on B21-F047A on the previous shift (midshift) during steady state operations.
-F047A on the previous shift (midshift) during steady state operations.
During the test, B21-F047A was opened at 0027 for 1 minute 0 seconds.
During the test, B21
-F047A was opened at 0027 for 1 minute 0 seconds.
INITIATING CUE:
INITIATING CUE:
CAUTION § All pre-job briefings are completed.
CAUTION
§ Do NOT shine any type light into a panel.
                § All pre-job briefings are completed.
                § Do NOT shine any type light into a panel.
The CRS has provided you with the following data sheets:
The CRS has provided you with the following data sheets:
* SRV B21-F047A tailpipe temperature graph
* SRV B21-F047A tailpipe temperature graph
* Pre-test and Post
* Pre-test and Post-test screen shots of PPC screens 6D-04 (IRM/APRM indications), D05AD1 (SPDS Summary Display), and DD5BD3 (SPDS RPV, Pri-Cnmt, and Hydrogen Display)
-test screen shots of PPC screens 6D
-04 (IRM/APRM indications), D05AD1 (SPDS Summary Display), and DD5BD3 (SPDS RPV, Pri
-Cnmt, and Hydrogen Display)
The CRS has marked block 310 of CPS 3831.01D002 Actuation Log NA.
The CRS has marked block 310 of CPS 3831.01D002 Actuation Log NA.
The CRS has directed you to complete CPS 3831.01 Safety Relief Valve Report for 1B21
The CRS has directed you to complete CPS 3831.01 Safety Relief Valve Report for 1B21-F047A.
-F047A.
Page 14 of 18
 
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 15 of 18 Attachments
Attachments B21-F047A Tailpipe Temperature Graph Page 15 of 18


B 21-F047A Tailpipe Temperature Graph Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 16 of 18 Pre and Post Test
Pre and Post Test Page 16 of 18


Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 17 of 18   Pre and Post Test
Pre and Post Test Page 17 of 18


Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 18 of 18   Pre and Post Test
Pre and Post Test Page 18 of 18


JPM484_R0 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure Evaluate License Maintenance Requirements JPM Number: JPM 484 Revision Number: 0 0 Date: 8/2 5/16 Developed By:
CLINTON POWER STATION Job Performance Measure Evaluate License Maintenance Requirements JPM Number: JPM484 Revision Number: 00 Date: 8/25/16 Developed By:         T. Jennings                       8/25/16 Instructor                         Date Validated By:         Michael Antonelli                 10/26/16 SME or Instructor                 Date Reviewed By:         Jim Lucas                         11/15/16 Operations Representative         Date Approved By:         Tony Jennings                     11/15/16 Training Department               Date JPM484_R0 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111
T. Jennings 8/2 5/16   Instructor Date Validated By:
 
Michael Antonelli 10/26/16   SME or Instructor Date Reviewed By:
JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)
Jim Lucas 11/15/16   Operations Representative Date Approved By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Tony Jennings 11/15/16   Training Department Date JPM Number: JPM484 - Rev 0 0  Clinton Power Station Job Performance Measure (JPM)
Page 2 of 12 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
(*).
Procedure OP-AA-105-102 Rev: 11 Procedur e  Rev: Procedure Rev: ________ 9. Verify cues both verbal and visual are free of conflict.
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 10. Verify performance time is accurate
Procedure OP-AA-105-102             Rev: 11 Procedure                          Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Procedure                           Rev:
________     9. Verify cues both verbal and visual are free of conflict.
________     10. Verify performance time is accurate
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date Page 2 of 12


SME / Instructor Date SME / Instructor Date SME / Instructor Date JPM Number: JPM484 - Rev 0 0  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 12 Revision Record (Summary)
Revision Record (Summary)
Revision Date Description 00 8/25/16 New JP M.
Revision Date                           Description 00     8/25/16 New JPM.
JPM Number: JPM484 - Rev 0 0  Clinton Power Station Job Performance Measure (JPM)
Page 3 of 12
Page 4 of 12 Simulator Setup Instructions
 
JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions
: 1. No simulator setup is required for this JPM.
: 1. No simulator setup is required for this JPM.
Page 4 of 12


JPM Number: JPM484 - Rev 0 0  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 12 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
TASK STANDARDS:
:
* The examinee correctly documents shifts worked during the quarter on OP-AA-105-102 Attachment 1 Active License Tracking Log and determines that 2 additional 8 hour or 12 hour RO watches are needed to maintain his/her license active past 12/31/16.
* The examinee correctly documents shifts worked during the quarter on OP
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
-AA-105-102 Attachment 1 Active License Tracking Log and determines that 2 additional 8 hour or 12 hour RO watches are needed to maintain his/her license active past 12/31/16. TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
* OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE Rev. 11 EVALUATOR INSTRUCTIONS:
* OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE Rev. 11 EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
* All pre-job briefings are completed.
* Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
* Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
* Provide the examinee with a blank copy of OP
* Provide the examinee with a blank copy of OP-AA-105-102 Attachment 1 Active License Tracking Log.
-AA-1 05-102 Attachment 1 Active License Tracking Log.
Page 5 of 12
 
JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS:
You are a Reactor Operator with an active NRC license.
Today is 12/23/16.
You are currently assigned to relieve the A RO on 1/2/17.
During the current quarter (4th quarter of 2016) you worked a mixed shift schedule consisting of the following:
* You stood three complete 12-hour day shift watches as the A RO on October 12th, 13th, and 14th.
* You stood two 8-hour swing shift watches as the B RO on October 23rd and 24th.
* You split 8-hour day shifts working 4 hours as the B RO and the remaining 4 hours as a clearance writer on October 1st, 2nd, 8th, 9th, 15th, 16th, 22nd, 27th, 29th, and 30th.
* You split two 12-hour midnight shifts, working six hours as the A RO and the other six hours as a clearance writer during the outage on November 10th and 11th.
* The remaining days in the 4th quarter of 2016 were spent as a clearance writer (Monday through Friday).
* All shifts covered were entered in the Narrative log.
INITIATING CUE:
CAUTION
                §  All pre-job briefings are completed.
                §  Do NOT shine any type light into a panel.
You are to document your shift coverage for the 4th quarter of 2016 on OP-AA-105-102 Attachment 1 Active License Tracking Log, and determine your ability to assume shift for 1/2/17.
START TIME:
Page 6 of 12


JPM Number: JPM484 - Rev 0 0  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 12  INITIAL CONDITIONS:
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
You are a Reactor Operator with an active NRC license
PERFORMANCE STEPS OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE JPM Step 1    Record shift coverage from 4th quarter of 2016.
. Today is 12/23/16.
Standard:          Examinee records the dates, shifts, length of shift, position filled, and signs attachment 1 using information from the initial conditions per the key (next page).
You are currently assigned to relieve the "A" RO on 1/2/17.
Cue:
During the current quarter (4 th quarter of 2016) you worked a mixed shift schedule consisting of the following:
Comments SAT £             UNSAT £                   Comment Number Page 7 of 12
* You stood three complete 12
-hour day shift watches as the "A" RO on October 12 th , 13 th, and 14 th.
* You stood two 8
-hour swing shift watches as the "B" RO on October 23 rd and 24 th.
* You split 8
-hour day shifts working 4 hours as the "B" RO and the remaining 4 hours as a clearance writer on October 1 st , 2nd , 8 th , 9 th , 15 th, 16 th , 22nd , 27 th , 29 th, and 30 th.
* You split two 12
-hour midnight shifts, working six hours as the "A" RO and the other six hours as a clearance writer during the outage on November 10 th and 11 th.
* The remaining days in the 4 th quarter of 2016 were spent as a clearance writer (Monday through Friday).
* All shifts covered were entered in the Narrative log. INITIATING CUE:
CAUTION § All pre-job briefings are completed.
§ Do NOT shine any type light into a panel.
You are to document your shift coverage for the 4 th quarter of 2016 on OP-AA-105-102 Attachment 1 Active License Tracking Log, and determine your ability to assume shift for 1/2/17.
START TIME: 


JPM Number: JPM484 - Rev 0 0  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 7 of 12 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
KEY Attachment 1 Active License Tracking Log Page 1 of 1 Employee Number: ______________  012345 (example)
PERFORMANCE STEPS OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE JPM Step 1 Record shift coverage from 4 th quarter of 2016
SHIFT COVERAGE FOR THE _____(1                  4th          ST
. Standard: Examinee records the dates, shifts, length of shift, position filled, and signs attachment 1 using information from the initial conditions per the key (next page)
                                                                , 2ND, 3RD, 4TH) CALENDAR QUARTER OF _____(YEAR)                  2016 Examinees Name
. Cue:  Comments  SAT  £ UNSAT  £ Comment Number 
_____________________                                                                                              ACTIVE / INACTIVE Name of License Holder (Print)                                                                                      License Status At Start Quarter (Circle one)
RECORD OF 8 /12 HOUR SHIFTS WORKED DURING QUARTER Enter the date the shift ended, the shift, the shift length, the Unit, position covered, circle Y or N for logged in the SM log and signature. If working an 8 hour or 8 / 12 hour shift, enter a 1 for midnight shift, 2 for the day shift, or a 3 for the afternoon shift (only enter shifts at least 8 hours length for which turnovers were conducted). Seven shifts at least 8 hours in length are required per quarter. If working a straight 12 hour shift, enter a N for night shift or a D for day shift (only enter shifts at least 12 hours in length for which turnovers were conducted). Five 12 hour shifts are required per quarter. The quarterly shift watch requirement may be completed with a combination of complete 8 and 12 hour shifts (in a position required by the plants Technical Specifications) at sites having a mixed shift schedule (enter appropriate shift designator), and watches shall not be truncated when the minimum quarterly requirement (56 hours) is satisfied. (NUREG 1021, Revision 9)
DATE          SHIFT        LENGTH            UNIT                POSITION                  SM LOG                SIGNATURE OF (circle one)                                  LICENSE HOLDER ONE                                                                                                          Logged 10/12/16      D (or 2)            12            1         FHS      SM      US      RO        Y/N Examinee Signature TWO                                                                                                          Logged 10/13/16      D (or 2)            12            1         FHS      SM      US      RO        Y/N Examinee Signature THREE          10/14/16      D (or 2)           12              1        FHS      SM      US      RO Logged Examinee Signature Y/N FOUR                                                                                                          Logged 10/23/16          3              8              1        FHS      SM      US      RO        Y/N Examinee Signature FIVE                                                                                                          Logged 10/24/16          3              8              1        FHS      SM      US      RO        Y/N            Examinee Signature SIX*                                                                                                          Logged FHS      SM      US      RO        Y/N SEVEN*                                                                                                          Logged FHS      SM      US      RO        Y/N
________________________/_____
Operations Support Manager Date KEY Page 8 of 12


JPM Number: JPM484 - Rev 0 0  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 8 of 12 KEY  Attachment 1 Active License Tracking Log Page 1 of 1 Employee Number: ______________ SHIFT COVERAGE FOR THE _____(1 ST , 2 ND , 3 RD , 4 TH) CALENDAR QUARTER OF _____(YEAR)
  *JPM Step 2 Reviews requirements to maintain an active license.
_____________________                                                                                    ACTIVE / INACTIVE Name of License Holder (Print)                                                                            License Status At Start
Standard:    Examinee determines that he/she does NOT have the minimum number of hours required to maintain their license in an active status past 12/31/16.
Cue:
Comments SAT £              UNSAT £                Comment Number
  *JPM Step 3 Reviews requirements to maintain an active license.
Standard:    Examinee determines that he/she is NOT eligible to stand watch on 1/2/17.
Cue:          When the examinee has determined that they will not be eligible to assume the watch on 1/2/17, ask him/her what additional requirements they will need to be able to stand the watch on 1/2/17.
Comments SAT £              UNSAT £                Comment Number
  *JPM Step 4 Reviews requirements to maintain their license active past 12/31/16.
Standard:    Examinee determines that a minimum of one more complete eight hour or twelve hour watch is needed to maintain their license active past 12/31/16.
Cue:          When the student has completed OP-AA-105-102 Attachment 1 Active License Tracking Log and determined eligibility to stand watch on 1/2/17 state that the JPM is complete.
Comments SAT £              UNSAT £                Comment Number Page 9 of 12


Quarter (Circle one)
JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)
RECORD OF 8 /12 HOUR SHIFTS WORKED DURING QUARTER Enter the date the shift ended, the shift, the shift length, the Unit, position covered, circle Y or N for logged in the SM log and signature. If working an 8 hour or 8 / 12 hour shift, enter a "1" for midnight shift, "2" for the day shift, or a "3" for the afternoon shift (only enter shifts at least 8 hours length for which turnovers were conducted). Seven shifts at least 8 hours in length are required per quarter. If working a straight 12 hour shift, enter a "N" for night shift or a "D" for day shift (only enter shifts at least 12 hours in length for which turnovers were conducted). Five 12 hour shifts are required per quarter. The quarterly shift watch requirement may be completed with a combination of complete 8 and 12 hour shifts (in a position required by the plant's Technical Specifications) at sites having a mixed shift schedule (enter appropriate shift designator), and watches shall not be truncated when the minimum quarterly requirement (56 hours) is satisfied.  (NUREG 1021, Revision 9)
TERMINATING CUES:
DATE SHIFT LENGTH UNIT POSITION (circle one)
The JPM is complete when the student has completed OP-AA-105-102 Attachment 1 Active License Tracking Log and determined eligibility to stand watch on 1/2/17.
SM LOG SIGNATURE OF LICENSE HOLDER ONE    FHS SM US  RO Logged Y / N  TWO    FHS SM US RO Logged Y / N  THREE    FHS SM US RO Logged Y / N  FOUR    FHS SM US RO Logged Y / N  FIVE    FHS SM US RO Logged Y / N  SIX*    FHS SM US RO Logged Y / N  SEVEN*    FHS SM US RO Logged Y / N    ________________________/_____
STOP TIME:
Operations Support Manager    Date KEY  012345 (example) 4th 2016 Examinee's Name 10/12/16 D (or 2) 12 1 1 1 1 1 10/1 3/16 10/1 4/16 10/23/16 10/24/16 D (or 2) D (or 2) 3 3 8 8 Examinee Signature Examinee Signature Examinee Signature Examinee Signature Examinee Signature 12 12 JPM Number: JPM484 - Rev 0 0  Clinton Power Station Job Performance Measure (JPM)
Page 10 of 12
Page 9 of 12 *JPM Step 2 Reviews requirements to maintain an active license
. Standard: Examinee determines that he/she does NOT have the minimum number of hours required to maintain their license in an active status past 12/31/16
. Cue:  Comments  SAT  £ UNSAT  £ Comment Numbe r      *JPM Step 3 Reviews requirements to maintain an active license
. Standard: Examinee determines that he/she is NOT eligible to stand watch on 1/2/17.
Cue: When the examinee has determined that they will not be eligible to assume the watch on 1/2/17, ask him/her what additional requirements they will need to be able to stand the watch on 1/2/17.
Comments  SAT  £ UNSAT  £ Comment Number 
  *JPM Step 4 Reviews requirements to maintain their license active past 12/31/16
. Standard: Examinee determines that a minimum of one more complete eight hour or twelve hour watch is needed to maintain their license active past 12/31/16
. Cue: When the student has completed OP
-AA-105-102 Attachment 1 Active License Tracking Log and determined eligibility to stand watch on 1/2/17 state that the JPM is complete.
Comments  SAT  £ UNSAT  £ Comment Number 


JPM Number: JPM484 - Rev 0 0  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 10 of 12 TERMINATING CUE S: The JPM is complete when the student has completed OP
Operators Name:
-AA-105-102 Attachment 1 Active License Tracking Log and determined eligibility to stand watch on 1/2/17
Job
. STOP TIME: 


JPM Number:  JPM484 - Rev 0 0  Clinton Power Station Job Performance Measure (JPM)
==Title:==
SRRS: 3D.105 (when utilized for operator initial or continuing training)
£ EO             £ RO               £ SRO           £ STA         £ SRO Cert JPM
Page 11 of 12 Operator's Name:
 
Job Title:
==Title:==
£ EO £ RO £ SRO £ STA £ SRO Cert JPM Title:
Evaluate License Maintenance Requirements JPM Number:       JPM484                                                      Revision Number: 00 Task Number and
Evaluate License Maintenance Requirements JPM Number:
 
JPM 4 84 Revision Number:
==Title:==
0 0 Task Number and Title:
LP85801.2.1.4 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, no solo operation, maintenance of active license status, 10CFR55, etc.
LP85801.2.1.4 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, "no solo" operation, maintenance of active license status, 10CFR55, etc.
K/A System         K/A Number                     Importance (RO/SRO)
K/A System K/A Number Importance (RO/SRO)
Generic               2.1.4                     3.3                 3.8 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, no solo operation, maintenance of active license status, 10CFR55, etc.
Generic 2.1.4 3.3 3.8 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, "no solo" operation, maintenance of active license status, 10CFR55, etc
Suggested Testing Environment:               Classroom Actual Testing Environment:               £ Simulator             £ Plant         £ Control Room Testing Method:         £ Simulate                     Alternate Path:       £ Yes       ¢ No
. Suggested Testing Environment:
                          ¢ Perform                           SRO Only:       £ Yes       ¢ No Time Critical:       £ Yes           ¢ No Estimated Time to Complete:           15 minutes                 Actual Time Used:             minutes
Classroom Actual Testing Environment:
£   Simulator £ Plant £ Control Room Testing Method:
£ Simulate Alternate Path:
£ Yes ¢ No   ¢ Perform SRO Only: £ Yes ¢ No Time Critical:
£ Yes ¢ No Estimated Time to Complete:
1 5 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 335: Line 342:


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                 £ Yes       £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             £ Satisfactory             £ Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                             (Print)
£ Yes £ No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Signature:                                                              Date:
£ Satisfactory
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            Page 11 of 12
£ Unsatisfactory Comments:
 
Evaluator's Name:
(Print)
Evaluator's Signature:
Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 12 of 12  INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are a Reactor Operator with an active NRC license.
You are a Reactor Operator with an active NRC license.
Today is 12/23/16.
Today is 12/23/16.
You are currently assigned to relieve the "A" RO on 1/2/17.
You are currently assigned to relieve the A RO on 1/2/17.
 
During the current quarter (4th quarter of 2016) you worked a mixed shift schedule consisting of the following:
During the current quarter (4 th quarter of 2016) you worked a mixed shift schedule consisting of the following:
* You stood three complete 12-hour day shift watches as the A RO on October 12th, 13th, and 14th.
* You stood three complete 12-hour day shift watches as the "A" RO on October 12 th , 13 th, and 14 th.
* You stood two 8-hour swing shift watches as the B RO on October 23rd and 24th.
* You stood two 8
* You split 8-hour day shifts working 4 hours as the B RO and the remaining 4 hours as a clearance writer on October 1st, 2nd, 8th, 9th, 15th, 16th, 22nd, 27th, 29th, and 30th.
-hour swing shift watches as the "B" RO on October 23 rd and 24 th.
* You split two 12-hour midnight shifts, working six hours as the A RO and the other six hours as a clearance writer during the outage on November 10th and 11th.
* You split 8
* The remaining days in the 4th quarter of 2016 were spent as a clearance writer (Monday through Friday).
-hour day shifts working 4 hours as the "B" RO and the remaining 4 hours as a clearance writer on October 1 st , 2nd , 8 th , 9 th , 15 th, 16 th , 22nd , 27 th , 29 th, and 30 th.
* You split two 12
-hour midnight shifts, working six hours as the "A" RO and the other six hours as a clearance writer during the outage on November 10 th and 11 th.
* The remaining days in the 4 th quarter of 2016 were spent as a clearance writer (Monday through Friday).
* All shifts covered were entered in the Narrative log.
* All shifts covered were entered in the Narrative log.
INITIATING CUE:
CAUTION
                §  All pre-job briefings are completed.
                §  Do NOT shine any type light into a panel.
You are to document your shift coverage for the 4th quarter of 2016 on OP-AA-105-102 Attachment 1 Active License Tracking Log, and determine your ability to assume shift for 1/2/17.
Page 12 of 12


INITIATING CUE:
CLINTON POWER STATION Job Performance Measure Print Reading - Determine Isolation Boundaries and Depressurize 1B21-F022A Accumulator JPM Number: JPM526 Revision Number: 01 Date: 8/26/16 Developed By:          T. Jennings                      8/26/16 Instructor                      Date Validated By:          Michael Antonelli                10/26/16 SME or Instructor                Date Reviewed By:          Jim Lucas                        11/15/16 Operations Representative        Date Approved By:          T. Jennings                      11/15/16 Training Department              Date JPM526_1 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111
CAUTION § All pre-job briefings are completed.
§ Do NOT shine any type light into a panel.
You are to document your shift coverage for the 4 th quarter of 2016 on OP
-AA-105-102 Attachment 1 Active License Tracking Log, and determine your ability to assume shift for 1/2/17.


JPM526_1 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure Print Reading
JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)
- Determine Isolation Boundaries and Depressurize 1B21-F022 A Accumulator JPM Number:  JPM526 Revision Number: 0 1 Date:  8/26/16 Developed By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
T. Jennings 8/26/16  Instructor Date  Validated By:
Michael Antonelli 10/26/16  SME or Instructor Date  Reviewed By:
Jim Lucas  11/15/16  Operations Representative Date  Approved By:
T. Jennings 11/15/16  Training Department Date JPM Number: JPM526 - rev 0 1  Clinton Power Station Job Performance Measure (JPM)
Page 2 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified. ________ 6. Task standards identified and verified by SME review.
________     6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revisio n: Procedure Rev:   Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
________ 10. Verify performance time is accurate
(*).
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                           Rev:
Procedure                           Rev:
Procedure                           Rev:
________     9. Verify cues both verbal and visual are free of conflict.
________     10. Verify performance time is accurate
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date Page 2 of 11


SME / Instructor Date SME / Instructor Date SME / Instructor Date JPM Number: JPM526 - rev 0 1  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 11 Revision Record (Summary)
Revision Record (Summary)
Revision Date Description 00 6/16/14 New JPM. 01 8/26/16 Corrected typographical error on page 5 and added revision numbers to the procedure references used for the JPM.
Revision Date                             Description 00     6/16/14 New JPM.
01     8/26/16 Corrected typographical error on page 5 and added revision numbers to the procedure references used for the JPM.
Page 3 of 11


JPM Number: JPM526 - rev 0 1  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 4 of 11 Simulator Setup Instructions
Simulator Setup Instructions
: 1. This is a RO Admin JPM and requires no simulator setup
: 1. This is a RO Admin JPM and requires no simulator setup.
.
Page 4 of 11
JPM Number: JPM526 - rev 0 1  Clinton Power Station Job Performance Measure (JPM)
 
Page 5 of 11 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)
TASK STANDARDS
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
:
TASK STANDARDS:
* The examinee determines isolation boundaries and depressurizes 1B21A001 A Inboard MSIV 1B21-F022 A accumulator using station mechanical drawings.
* The examinee determines isolation boundaries and depressurizes 1B21A001A Inboard MSIV 1B21-F022A accumulator using station mechanical drawings.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* None PROCEDURAL/
* None PROCEDURAL/
Line 407: Line 413:
* All pre-job briefings are completed.
* All pre-job briefings are completed.
* Administer this JPM in a location with access to station drawings and a computer (if requested).
* Administer this JPM in a location with access to station drawings and a computer (if requested).
Page 5 of 11


JPM Number: JPM526 - rev 0 1  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 11  INITIAL CONDITIONS:
INITIAL CONDITIONS:
The station is in a refueling outage.
The station is in a refueling outage.
All Inboard and Outboard Main Steam Line Isolation Valve hand switches are in the CLOSED position.
All Inboard and Outboard Main Steam Line Isolation Valve hand switches are in the CLOSED position.
INITIATING CUE:
INITIATING CUE:
CAUTION § All pre-job briefings are completed.
CAUTION
                §   All pre-job briefings are completed.
You are an extra RO.
You are an extra RO.
The CRS has requested that you determine which valves are required to:
The CRS has requested that you determine which valves are required to:
: 1) isolate air to accumulator 1B21-A001A (1B21-F022 A Inbd MSIV Air Accumulator), and 2) depressurize accumulator 1B21-A001 A Report to the CRS after completing the task
: 1) isolate air to accumulator 1B21-A001A (1B21-F022A Inbd MSIV Air Accumulator), and
. START TIME:
: 2) depressurize accumulator 1B21-A001A Report to the CRS after completing the task.
START TIME:
Page 6 of 11


JPM Number: JPM526 - rev 0 1  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 7 of 11 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
. PERFORMANCE STEPS M10-9002-5 *1 Determines that accumulator 1B21
PERFORMANCE STEPS M10-9002-5
-A001 A is located on print M10
              *1   Determines that accumulator 1B21-A001A is located on print M10-9002-5.
-9002-5. Standard: The examinee can determine the correct print by using one of the following methods:
Standard:           The examinee can determine the correct print by using one of the following methods:
* Passport equipment search
* Passport equipment search
* ESOMs equipment database
* ESOMs equipment database
* M05-1000 P&ID Index Cue: Comments   SAT   £ UNSAT   £ Comment Number
* M05-1000 P&ID Index Cue:
  *2 Determines that opening V3 (1B21-F083 A) will depressurize accumulator 1B21
Comments SAT £             UNSAT £                 Comment Number
-A001A. Standard: Examinee determines that V3 is the accumulator drain and uses the table at the top of M10-9002-5 to determine that V3 for 1B21
              *2   Determines that opening V3 (1B21-F083A) will depressurize accumulator 1B21-A001A.
-A001A is 1B21-F083A. Cue: Comments Steps 2 - 4 can be performed in any order.
Standard:           Examinee determines that V3 is the accumulator drain and uses the table at the top of M10-9002-5 to determine that V3 for 1B21-A001A is 1B21-F083A.
SAT   £ UNSAT   £ Comment Number
Cue:
Comments            Steps 2 - 4 can be performed in any order.
SAT £              UNSAT £                  Comment Number Page 7 of 11
 
JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM) 3 Determines that opening V2 (1IA092A) will depressurize the air supply header upstream of accumulator 1B21-A001A.
Standard:    Examinee determines that V2 is a drain that taps off of the IA supply line to 1B21-A001A upstream of check valve 1B21-F024A and determines that opening the valve will depressurize the IA supply line (but not the accumulator).
Cue:
Comments    This is an optional step added in the event that the examinee determines that opening 1IA092A is appropriate in depressurizing the IA supply header upstream of check valve 1B21-F024A.
It is NOT a competency hit if the examinee includes or excludes 1IA092A in his/her answer. It would be a failure of a critical step, however, if the examinee determines that solely opening 1IA092A will depressurize accumulator 1B21-A001A and does not include 1B21-F083A in his/her answer.
SAT £              UNSAT £                Comment Number
          *4 Determines that closing 1IA077A will isolate instrument air to accumulator 1B21-A001A.
Standard:    Examinee determines that the IA supply line to accumulator 1B21-A001A is located on M05-1040 Sheet 14, and then determines that 1IA077A is the isolation valve for line 1IA80AA 1/2.
Cue:
Comments     Steps 2 - 4 can be performed in any order.
SAT £             UNSAT £               Comment Number Page 8 of 11


JPM Number: JPM526 - rev 0 1  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM) 3   Determines that closing 1IA078A will depressurize the actuator air supply header for 1B21-F022A.
Page 8 of 11  3 Determines that opening V2 (1IA092 A) will depressurize the air supply header upstream of accumulator 1B21
Standard:         Examinee determines that 1IA078A is the actuator air supply isolation valve supplying air to the actuator solenoids for 1B21-F022A.
-A001A. Standard: Examinee determines that V2 is a drain that taps off of the IA supply line to 1B21
Cue:
-A001A upstream of check valve 1B21
Comments         This is an optional step added in the event that the examinee determines that closing 1IA078A is needed to isolate all air sources from 1B21-A001A.
-F024A and determines that opening the valve will depressurize the IA supply line (but not the accumulator).
With the MSIV control switch in the CLOSE position (provided in the initiating cue), actuator air via 1IA078A is isolated from 1B21-A001A by the A and B operating solenoids. It is NOT a competency hit if the examinee includes or excludes 1IA078A in his/her answer. It would be a failure of a critical step however, if the examinee determines that solely closing 1IA078A will isolate air to accumulator 1B21-A001A and does not include 1IA077A in his/her answer.
Cue: Comments This is an optional step added in the event that the examinee determines that opening 1IA092 A is appropriate in depressurizing the IA supply header upstream of check valve 1B21
SAT £               UNSAT £               Comment Number TERMINATING CUES:
-F024A. It is NOT a competency hit if the examinee includes or excludes 1IA092 A in his/her answer. It would be a failure of a critical step, however, if the examinee determines that solely opening 1IA092 A will depressurize accumulator 1B21
The examinee has identified the IA isolation and drain valve for accumulator 1B21A001A using station mechanical drawings.
-A 001A and does not include 1B21
STOP TIME:
-F083 A in his/her answer.
Page 9 of 11
SAT   £ UNSAT   £ Comment Number
  *4 Determines that closing 1IA077 A will isolate instrument air to accumulator 1B21
-A001 A. Standard: Examinee determines that the IA supply line to accumulator 1B21
-A001A is located on M05
-1040 Sheet 14, and then determines that 1IA077 A is the isolation valve for line 1IA80 AA 1/2. Cue: Comments Steps 2 - 4 can be performed in any order.
SAT  £ UNSAT  £ Comment Number 


JPM Number: JPM526 - rev 0 1  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 9 of 11  3 Determines that closing 1IA0 78 A will depressurize the actuator air supply header for 1B21-F022 A. Standard: Examinee determines that 1IA078 A is the actuator air supply isolation valve supplying air to the actuator solenoids for 1B21
Operators Name:
-F022 A. Cue:  Comments This is an optional step added in the event that the examinee determines that closing 1IA078 A is needed to isolate all air sources from 1B21
Job
-A001A. With the MSIV control switch in the CLOSE position (provided in the initiating cue), actuator air via 1IA078A is isolated from 1B21
-A001A by the 'A' and 'B' operating solenoids. It is NOT a competency hit if the examinee includes or excludes 1IA0 78 A in his/her answer. It would be a failure of a critical step however, if the examinee determines that solely closing 1IA0 78 A will isolate air to accumulator 1B21
-A001 A and does not include 1IA077A in his/her answer.
SAT  £ UNSAT  £ Comment Number TERMINATING CUES:
The examinee has identified the IA isolation and drain valve for accumulator 1B21A001 A using station mechanical drawings.
STOP TIME: 


JPM Number:  JPM526  - rev 0 1  Clinton Power Station Job Performance Measure (JPM)
==Title:==
SRRS: 3D.105 (when utilized for operator initial or continuing training)
£ EO               £ RO               £ SRO           £ STA         £ SRO Cert JPM
Page 10 of 11 Operator's Name:
 
Job Title:
==Title:==
£ EO £ RO £ SRO £ STA £ SRO Cert JPM Title:
Print Reading - Determine Isolation Boundaries and Depressurize 1B21-F022A Accumulator JPM Number:     JPM526                                                        Revision Number: 00 Task Number and
Print Reading  
 
- Determine Isolation Boundaries and Depressurize 1B21
==Title:==
-F022A Accumulator JPM Number: JPM 526 Revision Number:
0.13L Read Mechanical and Electrical Prints K/A System         K/A Number                     Importance (RO/SRO)
0 0 Task Number and Title:
NA                 2.2.41                     3.5                 3.9 Suggested Testing Environment:                 Simulator or Classroom Actual Testing Environment:               ¢ Simulator             £ Plant         £ Control Room Testing Method:         £ Simulate                     Alternate Path:       £ Yes       ¢ No
0.13L Read Mechanical and Electrical Prints K/A System K/A Number Importance (RO/SRO)
                          ¢ Perform                           SRO Only:       £ Yes       ¢ No Time Critical:       £ Yes           ¢ No Estimated Time to Complete:           20 minutes                 Actual Time Used:             minutes
NA 2.2.41 3.5 3.9 Suggested Testing Environment:
Simulator or Classroom Actual Testing Environment:
¢   Simulator £ Plant £ Control Room Testing Method:
£ Simulate Alternate Path:
£ Yes ¢ No   ¢ Perform SRO Only: £ Yes ¢ No Time Critical:
£ Yes ¢ No Estimated Time to Complete:
2 0 minutes Actual Time Used:
minutes  


==References:==
==References:==
M10-9002-5, M05-1040-14 EVALUATION  
M10-9002-5, M05-1040-14 EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                 £ Yes       £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             £ Satisfactory             £ Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                              (Print)
£ Yes £ No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Signature:                                                              Date:
£ Satisfactory
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            Page 10 of 11
£ Unsatisfactory Comments:


Evaluator's Name:
(Print)
Evaluator's Signature:
Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 11 of 11  INITIAL CONDITIONS:
INITIAL CONDITIONS:
The station is in a refueling outage.
The station is in a refueling outage.
All Inboard and Outboard Main Steam Line Isolation Valve hand switches are in the CLOSED position.
All Inboard and Outboard Main Steam Line Isolation Valve hand switches are in the CLOSED position.
INITIATING CUE:
INITIATING CUE:
CAUTIO N § All pre-job briefings are completed.
CAUTION
                §   All pre-job briefings are completed.
You are an extra RO.
You are an extra RO.
The CRS has requested that you determine which valves are required to:
The CRS has requested that you determine which valves are required to:
: 1) isolate air to accumulator 1B21
: 1) isolate air to accumulator 1B21-A001A (1B21-F022A Inbd MSIV Air Accumulator), and
-A001A (1B21
: 2) depressurize accumulator 1B21-A001A Report to the CRS after completing the task.
-F022A Inbd MSIV Air Accumulator), and 2) depressurize accumulator 1B21
Page 11 of 11
-A001A Report to the CRS after completing the task.
 
CLINTON POWER STATION Job Performance Measure Use CPS RP On-Line To Determine Radiological Requirements JPM Number: JPM532 Revision Number: 01 Date: 8/29/16 Developed By:          T. Jennings                      8/29/16 Instructor                        Date Validated By:        Michael Antonelli                10/26/16 SME or Instructor                Date Reviewed By:          Jim Lucas                        11/15/16 Operations Representative        Date Approved By:          T. Jennings                      11/15/16 Training Department              Date Retain approved Master Copy per SRRS 3D.126/3D.111 JPM532_R1 Facility Approved.doc


Retain approved Master Copy per SRRS 3D.126/3D.111 JPM532_R1 Facility Approved.doc CLINTON POWER STATION Job Performance Measure Use CPS RP On-Line To Determine Radiological Requirements JPM Number:  JPM532 Revision Number: 0 1 Date:  8/29/16 Developed By:
JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)
T. Jennings 8/29/16  Instructor Date  Validated By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Michael Antonel li  10/26/16  SME or Instructor Date  Reviewed By:
Jim Lucas  11/15/16  Operations Representative Date  Approved By:
T. Jennings 11/15/16  Training Department Date JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 2 of 14 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included. ________ 3. Performance location specified. (in
________     2. Knowledge and Abilities (K/A) references are included.
-plant, control room, simulator, or other)
________     3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________     4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________     6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
Procedure RP-AA-210 Rev: 2 6  Procedure RP-AA-376 Rev: 9 Procedure RP-AA-403 Rev: 8 Procedure RP-AA-460 Rev: 2 8  ________ 9. Verify cues both verbal and visual are free of conflict.
(*).
________ 10. Verify performance time is accurate
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Procedure RP-AA-210                 Rev: 26 Procedure RP-AA-376                 Rev: 9 Procedure RP-AA-403                 Rev: 8 Procedure RP-AA-460                 Rev: 28
________     9. Verify cues both verbal and visual are free of conflict.
________     10. Verify performance time is accurate
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date Page 2 of 14
 
JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Revision Record (Summary)
Revision  Date                            Description 00    10/7/14 New JPM.
01    8/29/16 Updated procedure revisions and made editorial changes throughout.
Page 3 of 14


SME / Instructor Date SME / Instructor Date SME / Instructor Date JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 14 Revision Record (Summary)
Simulator Setup Instructions
Revision Date Description 00 10/7/14 New JPM. 01 8/29/16 Updated procedure revisions and made editorial changes throughout.
: 1. There are no simulator setup instructions for this JPM.
Page 4 of 14


JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 4 of 14 Simulator Setup Instructions
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
: 1. There are no simulator setup instructions for this JPM
TASK STANDARDS:
.
JPM Number:  JPM532  - rev 01  Clinton Power Station Job Performance Measure (JPM)
Page 5 of 14 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
:
* Given a specific location in a Radiological Controlled Area (RCA), demonstrate the ability to obtain survey data and determine highest dose rate.
* Given a specific location in a Radiological Controlled Area (RCA), demonstrate the ability to obtain survey data and determine highest dose rate.
* Given a Radiological Work Permit (RWP), determine the RWP requirements for entering a specific location in an RCA
* Given a Radiological Work Permit (RWP), determine the RWP requirements for entering a specific location in an RCA.
. TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
* RP-AA-210, Rev. 2 6 DOSIMETRY ISSUE, USAGE, AND CONTROL
* RP-AA-210, Rev. 26 DOSIMETRY ISSUE, USAGE, AND CONTROL
* RP-AA-376, REV.
* RP-AA-376, REV. 9 RADIOLOGICAL POSTINGS, LABELING, AND MARKINGS
9 RADIOLOGICAL POSTINGS, LABELING, AND MARKINGS
* RP-AA-403, Rev. 8 ADMINISTRATION OF THE RADIATION WORK PERMIT PROGRAM
* RP-AA-403, Rev.
* RP-AA-460, Rev. 28 CONTROLS FOR HIGH AND LOCKED HIGH RADIATION AREAS EVALUATOR INSTRUCTIONS:
8 ADMINISTRATION OF THE RADIATION WORK PERMIT PROGRAM
* RP-A A-460, Rev. 2 8 CONTROLS FOR HIGH AND LOCKED HIGH RADIATION AREAS EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
* All pre-job briefings are completed.
* This JPM can be performed in a classroom or other suitable setting that has access to a computer with LAN access.
* This JPM can be performed in a classroom or other suitable setting that has access to a computer with LAN access. CPS RP On-Line Main Screen will be displayed.
CPS RP On-Line Main Screen will be displayed.
* This JPM contains 2 attachments (RWP and Survey Map) in addition to the Initial Conditions and Initiating Cue page (last) page of the JPM. Do NOT provide the examinee with these attachments until prompted to do so.
* This JPM contains 2 attachment s (RWP and Survey Map) in addition to the Initial Conditions and Initiating Cue page (last
) page of the JPM. Do NOT provide the examinee with these attachments until prompted to do so.
* Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
* Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
Page 5 of 14


JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 14  INITIAL CONDITIONS:
INITIAL CONDITIONS:
It is 12/3/16.
It is 12/3/16.
The plant is operating at rated thermal power.
The plant is operating at rated thermal power.
Annunciator 5130
Annunciator 5130-6E O.G. Analyzer A Trouble Chk Status Lights has just been received on the A OG Hydrogen Analyzer at 1H13-P845 Off Gas Control Panel.
-6E O.G. Analyzer A Trouble Chk Status Lights has just been received on the 'A' OG Hydrogen Analyzer at 1H13-P845 Off Gas Control Panel.
INITIATING CUE:
INITIATING CUE:
CAUTION § All pre-job briefings are completed.
CAUTION
Retrieve and review the latest periodic survey data for the 'A' OG Hydrogen Analyzer using CPS RP On-Line in preparation for entering the 'A' OG Hydrogen Analyzer room to investigate the trouble alarm. Determine requirements for entry and dose levels.
              §   All pre-job briefings are completed.
START TIME:
Retrieve and review the latest periodic survey data for the A OG Hydrogen Analyzer using CPS RP On-Line in preparation for entering the A OG Hydrogen Analyzer room to investigate the trouble alarm.
Determine requirements for entry and dose levels.
START TIME:
Page 6 of 14


JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 7 of 14 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS RP-AA-403 Administration of the Radiation Work Permit Program RP-AA-460 Controls for High and Locked High Radiation Areas RP-AA-1008 Unescorted Access To And Conduct In Radiologically Controlled Areas
PERFORMANCE STEPS RP-AA-403 Administration of the Radiation Work Permit Program RP-AA-460 Controls for High and Locked High Radiation Areas RP-AA-1008 Unescorted Access To And Conduct In Radiologically Controlled Areas
*1 Examinee retrieves the latest periodic survey data for the 'A' OG Hydrogen Analyzer using the CPS RP On-Line computer program.
              *1   Examinee retrieves the latest periodic survey data for the A OG Hydrogen Analyzer using the CPS RP On-Line computer program.
Standard: Examinee clicks on the box labeled Turbine Building.
Standard:           Examinee clicks on the box labeled Turbine Building.
Examinee clicks on the box labeled 800'.
Examinee clicks on the box labeled 800.
Examinee clicks the link for the latest periodic "Pre-Treatment A/E PRM" survey (in the "Survey" column). Cue: 1. When the examinee has retrieved the survey sheet in CPS RP On-Line, provide the examinee with Attachment 2 - Survey Map and then close the CPS RP On-Line program.
Examinee clicks the link for the latest periodic Pre-Treatment A/E PRM survey (in the Survey column).
: 2. Ask the examinee to determine the highest dose rate in the walking path to the OG Hydrogen Analyzer
Cue:               1. When the examinee has retrieved the survey sheet in CPS RP On-Line, provide the examinee with Attachment 2 - Survey Map and then close the CPS RP On-Line program.
: s. Comments When the examinee clicks the link for the latest "Pre
: 2. Ask the examinee to determine the highest dose rate in the walking path to the OG Hydrogen Analyzers.
-Treatment A/E PRM" survey, a PDF document of the survey sheet for the room will open. SAT  £ UNSAT   £ Comment Number
Comments           When the examinee clicks the link for the latest Pre-Treatment A/E PRM survey, a PDF document of the survey sheet for the room will open.
SAT £              UNSAT £                  Comment Number Page 7 of 14
 
JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)
          *2 Examinee determines the highest dose rate in the walking path to the A OG Hydrogen Analyzer Room.
Standard:    Identifies the intended location on the map and determines the highest dose rate in the walking path to the A OG Hydrogen Analyzer is 2.2 mr/hr.
Cue:        Ask the examinee to identify the location of the highest dose rate in the TB 805 EL. Pre-Treatment A/E PRM Room.
Comments    The contamination levels in the room are all less than 1,000 dpm/100cm2; no contaminated area posting is required.
SAT £              UNSAT £              Comment Number
          *3 Examinee determines the location of the area containing the highest dose rate in the TB 805 EL. Pre-Treatment A/E PRM Room.
Standard:    Examinee reviews the survey map and determines the highest dose rate is on a component in the HRA area by the A/E PRM (annotated by *1500/260).
Cue:        Ask the examinee to identify the RWP requirements for entering the area with the highest dose rate.
Comments SAT £              UNSAT £              Comment Number Page 8 of 14
 
JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)
              *4   Examinee determines the RWP requirements for entering the HRA area.
Standard:        Examinee determines that entry into the HRA area requires a specific HRA briefing.
Cue:              JPM is complete.
Comments SAT £           UNSAT £               Comment Number TERMINATING CUES:
The examinee has demonstrated the proper method to enter a specific location in a Radiological Controlled Area (RCA).
STOP TIME:
Page 9 of 14


JPM Number: JPM532  - rev 01  Clinton Power Station Job Performance Measure (JPM)
FOR TRAINING USE ONLY Operators Name:
Page 8 of 14 *2 Examinee determines the highest dose rate in the walking path to the 'A' OG Hydrogen Analyzer Room.
Job
Standard: Identifies the intended location on the map and determines the highest dose rate in the walking path to the 'A' OG Hydrogen Analyzer is 2.2 mr/hr. Cue: Ask the examinee to identify the location of the highest dose rate in the TB 805
' EL. Pre-Treatment A/E PRM Room
. Comments The contamination levels in the room are all less than 1,000 dpm/100cm2; no contaminated area posting is required.
SAT  £ UNSAT  £ Comment Number 
  *3 Examinee determines the location of the area containing the highest dose rate in the TB 805' EL. Pre
-Treatment A/E PRM Room
. Standard: Examinee reviews the survey map and determines the highest dose rate is on a component in the HRA area by the A/E PRM (annotated by *1500/260)
. Cue: Ask the examinee to identify the RWP requirements for entering the area with the highest dose rate.
Comments  SAT  £ UNSAT  £ Comment Number 


JPM Number: JPM532  - rev 01  Clinton Power Station Job Performance Measure (JPM)
==Title:==
Page 9 of 14  *4 Examinee determines the RWP requirements for entering the HRA area. Standard: Examinee determines that entry into the HRA area requires a specific HRA briefing. Cue: JPM is complete.
£ EO          £ RO          £ SRO          £ STA          £ SRO Cert JPM
Comments  SAT  £ UNSAT  £ Comment Number 


TERMINATING CUES:
==Title:==
The examinee has demonstrated the proper method to enter a specific location in a Radiological Controlled Area (RCA)
Use CPS RP On-Line To Determine Radiological Requirements JPM Number:      JPM532                                              Revision Number: 00 Task Number and
. STOP TIME:


FOR TRAINING USE ONLY Page 10 of 14 Operator's Name:
==Title:==
Job Title:
102405.01 Apply the administrative requirements of ALARA program K/A System         K/A Number           Importance (RO/SRO)
£  EO £  RO £  SRO £  STA £  SRO Cert JPM Title:
Generic             2.3.7             3.5                 3.6 Ability to comply with radiation work permit requirements during normal or abnormal conditions.
Use CPS RP On-Line To Determine Radiological Requirements JPM Number:
Suggested Testing Environment:       Classroom/Simulator Actual Testing Environment:       £ Simulator           £ Plant           £ Control Room Testing Method:       £ Simulate             Alternate Path:     £ Yes       ¢ No
JPM 532 Revision Number:
                        ¢ Perform                   SRO Only:       £ Yes       ¢ No Time Critical:     £ Yes       ¢ No Estimated Time to Complete:       20 minutes             Actual Time Used:             minutes
0 0 Task Number and Title:
102405.01 Apply the administrative requirements of ALARA program K/A System K/A Number Importance (RO/SRO)
Generic 2.3.7 3.5 3.6 Ability to comply with radiation work permit requirements during normal or abnormal conditions.
Suggested Testing Environment:
Classroom/Simulator Actual Testing Environment:
£ Simulator £ Plant £ Control Room Testing Method:
£ Simulate Alternate Path:
£ Yes ¢ No   ¢ Perform SRO Only: £ Yes ¢ No Time Critical:
£ Yes ¢ No Estimated Time to Complete:
2 0 minutes Actual Time Used:
minutes  


==References:==
==References:==
* RP-AA-210, Rev. 2 6 Dosimetry Issue, Usage, and Control
* RP-AA-210, Rev. 26 Dosimetry Issue, Usage, and Control
* RP-AA-376, Rev. 9 Radiological Postings, Labeling, and Markings
* RP-AA-376, Rev. 9 Radiological Postings, Labeling, and Markings
* RP-AA-403, Rev.
* RP-AA-403, Rev. 8 Administration of the Radiation Work Permit Program
8 Administration of the Radiation Work Permit Program
* RP-AA-460, Rev. 28 Controls For High and Locked High Radiation Areas EVALUATION  
* RP-AA-460, Rev. 2 8 Controls For High and Locked High Radiation Areas EVALUATION SUMM ARY: Were all the Critical Elements performed satisfactorily?
 
£ Yes £ No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
==SUMMARY==
£ Satisfactory
Were all the Critical Elements performed satisfactorily?     £ Yes         £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                     £ Satisfactory         £ Unsatisfactory Comments:
£ Unsatisfactory Comments:
Evaluators Name:                                                   (Print)
Evaluator's Name:
Evaluators Signature:                                                   Date:
(Print) Evaluator's Signature:
Page 10 of 14
Date:
 
FOR TRAINING USE ONLY Page 11 of 14 Attachment 1 - Radiation Work Permit (RWP)
FOR TRAINING USE ONLY Attachment 1 - Radiation Work Permit (RWP)
Clinton Power Station Radiation Work Permit Worker Information RWP#: 10010001           Rev:   0 RWP
Clinton Power Station Radiation Work Permit                                                   RWP#: 10010001                     Rev:       0 Worker Information RWP


== Description:==
== Description:==
20 16 Operations Department Generic Unit:                       Building:                 Elevation:               Location:
2016 Operations Department Generic Unit:               Building:           Elevation:         Location:
1                             All                           All                           Various Equipment:             Various RWP Dose Approval:
1                   All                   All               Various Equipment:           Various RWP Dose Approval: 25 mrem ED Dose Alarm: 20 mrem Dose Rate Alarm: 200 mrem/hr Exposure Monitoring Requirements                                       Respiratory Protection Required DLR and Electronic Dosimeter                                           Radiation Protection shall evaluate for engineering control and respiratory protection per RP-AA-401.
ED Dose Alarm:
Teledosimetry may be used in lieu of standard ED.
Dose Rate Alarm:
ED setpoints may be raised IAW RP-AA-403 based upon current survey data in the work location.
25 mrem 20 mrem 200 mrem/hr Exposure Monitoring Requirements Respiratory Protection Required DLR and Electronic Dosimeter Teledosimetry may be used in lieu of standard ED.
Special Instructions                                                   Protective Clothing Requirements This RWP allows High Radiation Area access: A specific                 Protective Clothing ( 100,000 dpm/100 cm2)
ED setpoints may be raised IAW RP
HRA briefing is required to enter.
-AA-403 based upon current survey data in the work location.
Coveralls, Hardhat cover, cotton liners, 1 pair rubber No LHRA access permitted on this RWP.                                 gloves, rubber shoe covers and booties Electronic Dosimeters should be checked at approximately 15 minute intervals or more often in higher radiation areas.           Protective Clothing (< 10,000 dpm/100 cm2)
Radiation Protection shall evaluate for engineering control and respiratory protection per RP
RP APPROVAL REQUIRED Radiation Worker Pocket Data Sheet Trip Ticket will be used by each individual for each entry.                               Modesty garments, rubber shoe covers and booties, cotton liners, 1 pair rubber gloves Verify with RP that your work area has been surveyed AND that the ED dose rate alarm and dose alarm setpoints are               Company modesty garments shall be worn under PCs.
-AA-401. Special Instructions Protective Clothing Requirements This RWP allows High Radiation Area access: A specific HRA briefing is required to enter.
adequate. If dose rates and/or contamination levels and/or dosimetry placement (when applicable) are not known for current plant status, an RPT may survey the area prior to start of work.
No LHRA access permitted on this RWP.
Electronic Dosimeters should be checked at approximately 15 minute intervals or more often in higher radiation areas.
Radiation Worker Pocket Data Sheet "Trip Ticket" will be  
 
used by each individual for each entry.
Verify with RP that your work area has been surveyed AND that the ED dose rate alarm and dose alarm setpoints are adequate. If dose rates and/or contamination levels and/or dosimetry placement (when applicable) are not known for current plant status, an RPT may survey the area prior to start of work.
Contact RP prior to accessing areas above 7 ft.
Contact RP prior to accessing areas above 7 ft.
NO work to be done in pools of water on this RWP, ie 755 Fuel/828&737 CT and suppression pool.
NO work to be done in pools of water on this RWP, ie 755 Fuel/828&737 CT and suppression pool.
Line 650: Line 645:
: 1. GA dose rates =/> 200 mr/hr
: 1. GA dose rates =/> 200 mr/hr
: 2. GA contamination levels =/> 100K dpm/100cm2
: 2. GA contamination levels =/> 100K dpm/100cm2
: 3. Airborne radioactivity =/> 0.3 DAC Coveralls, Hardhat cover, cotton liners, 1 pair rubber gloves, rubber shoe covers and booties Protective Clothing (< 10,000 dpm/100 cm2)
: 3. Airborne radioactivity =/> 0.3 DAC Page 11 of 14
RP APPROVAL REQUIRED


Modesty garments, rubber shoe covers and booties, cotton liners, 1 pair rubber gloves
FOR TRAINING USE ONLY Attachment 1 (contd) - Radiation Work Permit (RWP)
 
Clinton Power Station Radiation Work Permit                       RWP#: 10010001         Rev: 0 Radiation Protection Information Survey Frequency Requirements:              Shielding Recommended:
Company modesty garments shall be worn under PC's.
Radiation :           R           None Contamination: R                     Temporary Airborne:             R             Permanent Pre-Job Briefing Notes:
 
FOR TRAINING USE ONLY Page 12 of 14 Attachment 1 (cont'd) - Radiation Work Permit (RWP)
Clinton Power Station Radiation Work Permit Radiation Protection Information RWP#: 10010001           Rev:   0 Survey Frequency Requirements:
Radiation :          R Contamination:   R Airborne:             R Shielding Recommended:
None Temporary Permanent   Pre-Job Briefing Notes:
RPT Coverage / Comments:
RPT Coverage / Comments:
  &#xff; Initial Intermittent
Initial Intermittent Continuous RP Supervisor                              ALARA Review By Prepared By                                Terminated By J. Smith                          1/1/2015 Job Supervisor Page 12 of 14
&#xff; Continuous


RP Supervisor ALARA Review By Prepared By J. Smith                                                                          1/1/2015 Terminated By Job Supervisor
FOR TRAINING USE ONLY Attachment 2 - Survey Map Page 13 of 14


FOR TRAINING USE ONLY Page 13 of 14 Attachment 2 - Survey Map
INITIAL CONDITIONS:
 
Page 14 of 14  INITIAL CONDITIONS:
It is 12/3/16.
It is 12/3/16.
The plant is operating at rated thermal power.
The plant is operating at rated thermal power.
Annunciator 5130
Annunciator 5130-6E O.G. Analyzer A Trouble Chk Status Lights has just been received on the A OG Hydrogen Analyzer at 1H13-P845 Off Gas Control Panel.
-6E O.G. Analyzer A Trouble Chk Status Lights has just been received on the 'A' OG Hydrogen Analyzer at 1H13
-P845 Off Gas Control Panel.
INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.
CAUTION
Retrieve and review the latest survey data for the 'A' OG Hydrogen Analyzer using CPS RP On
              &sect;   All pre-job briefings are completed.
-Line in preparation for entering the 'A' OG Hydrogen Analyzer room to investigate the trouble alarm.
Retrieve and review the latest survey data for the A OG Hydrogen Analyzer using CPS RP On-Line in preparation for entering the A OG Hydrogen Analyzer room to investigate the trouble alarm.
Determine requirements for entry and dose levels.  
Determine requirements for entry and dose levels.
Page 14 of 14


JPM425_R02 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure Review Surveillance 9820.01 Power Distribution Limits JPM Number: JPM425 Revision Number: 0 2 Date: 8/23/16 Developed By:
CLINTON POWER STATION Job Performance Measure Review Surveillance 9820.01 Power Distribution Limits JPM Number: JPM425 Revision Number: 02 Date: 8/23/16 Developed By:         T. Jennings                       8/23/16 Instructor                         Date Validated By:         Matt Baker                         10/26/16 SME or Instructor                 Date Reviewed By:         Jim Lucas                         11/15/16 Operations Representative         Date Approved By:         T. Jennings                       11/15/16 Training Department               Date JPM425_R02 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111
T. Jennings 8/23/16   Instructor Date Validated By:
 
Matt Baker 10/26/16   SME or Instructor Date Reviewed By:
JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Jim Lucas 11/15/16   Operations Representative Date Approved By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
T. Jennings 11/15/16   Training Department Date JPM Number: JPM425 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
Page 2 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
(*).
Procedure CPS 9820.01 Rev: 34 Procedure CPS 9820.01D001 Rev: 32e Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 10. Verify performance time is accurate
Procedure CPS 9820.01               Rev: 34 Procedure CPS 9820.01D001           Rev: 32e Procedure                           Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________     9. Verify cues both verbal and visual are free of conflict.
________     10. Verify performance time is accurate
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date Page 2 of 11


SME / Instructor Date SME / Instructor Date SME / Instructor Date JPM Number: JPM425 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 11 Revision Record (Summary)
Revision Record (Summary)
Revision Date Description 00 7/26/10 New JPM number and updated revisions (10110001SAF01) 01 06/14/13 Converted to new template 02 8/23/16 Updated procedure references.
Revision   Date                           Description 00     7/26/10 New JPM number and updated revisions (10110001SAF01) 01     06/14/13 Converted to new template 02     8/23/16 Updated procedure references.
Page 3 of 11


JPM Number: JPM425 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 4 of 11 Simulator Setup Instructions
Simulator Setup Instructions
: 1. This JPM can be performed in a classroom or other secure area with the 3D cases generated per step 2. 2. The following can be used as necessary to recreate the 3D Case printouts with out of spec MFLCPR and MFLPD:
: 1. This JPM can be performed in a classroom or other secure area with the 3D cases generated per step 2.
: 2. The following can be used as necessary to recreate the 3D Case printouts with out of spec MFLCPR and MFLPD:
: a. Initialize to a full power IC.
: a. Initialize to a full power IC.
: b. Insert Malfunction M3D_FLCPR_V_10 to a final value of 1.012 to raise MFLCPR for fuel assembly 21-18 to a value greater than 1.0.
: b. Insert Malfunction M3D_FLCPR_V_10 to a final value of 1.012 to raise MFLCPR for fuel assembly 21-18 to a value greater than 1.0.
: c. Insert Malfunction M3D_FLPD_V_2 to a final value of 1.083 to raise MFLPD for fuel assembly 23
: c. Insert Malfunction M3D_FLPD_V_2 to a final value of 1.083 to raise MFLPD for fuel assembly 23-32 to a value greater than 1.0.
-32 to a value greater than 1.0.
: d. Print out a 3D case.
: d. Print out a 3D case
: e. Verify MFLCPR and MFLPD are > 1.0.
. e. Verify MFLCPR and MFLPD are > 1.0.
: 3. Freeze Simulator.
: 3. Freeze Simulator.
: 4. Markup a copy of 9820.01D001 Power Distribution Limits Data Sheet to match the attached example. 5. Attach the 3D Monicore Case to the copy of 9820.01D001.
: 4. Markup a copy of 9820.01D001 Power Distribution Limits Data Sheet to match the attached example.
: 5. Attach the 3D Monicore Case to the copy of 9820.01D001.
Page 4 of 11


JPM Number: JPM425 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 11 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
TASK STANDARDS:
:
* The CRS review finds the two mistakes on the datasheet showing all thermal limits are in specification which is in conflict with the 3D Monicore Case showing a bundle with a MFLCPR and MFLPD of greater than one.
* The CRS review finds the two mistak es on the datasheet showing all thermal limits are in specification which is in conflict with the 3D Monicore Case showing a bundle with a MFLCPR and MFLPD of greater than one.
* CPS No. 9820.01 Power Distribution Limits, Revision 34.
* CPS No. 9820.01 Power Distribution Limits, Revision 3
: 4.
* CPS No. 9820.01D001 Power Distribution Limits Data Sheet, Revision 32e.
* CPS No. 9820.01D001 Power Distribution Limits Data Sheet, Revision 32e.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
Line 728: Line 716:


==REFERENCES:==
==REFERENCES:==
* CPS No. 9820.01 Power Distribution Limits, Revision 3
* CPS No. 9820.01 Power Distribution Limits, Revision 34.
: 4.
* CPS No. 9820.01D001 Power Distribution Limits Data Sheet, Revision 32e.
* CPS No. 9820.01D001 Power Distribution Limits Data Sheet, Revision 32e.
* Technical Specifications 3.2.2 Amendment 192
* Technical Specifications 3.2.2 Amendment 192
Line 737: Line 724:
* When the initiating cue is read, provide the student with the marked up copy of 9820.01D001 with the attached 3D Monicore Printout.
* When the initiating cue is read, provide the student with the marked up copy of 9820.01D001 with the attached 3D Monicore Printout.
* All pre-job briefings are completed.
* All pre-job briefings are completed.
Page 5 of 11


JPM Number: JPM425 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 11  INITIAL CONDITIONS:
INITIAL CONDITIONS:
The unit is at full power. A rod shuffle was completed one hour ago. The B RO has just completed 9820.01 Power Distribution Limits surveillance.
The unit is at full power. A rod shuffle was completed one hour ago. The B RO has just completed 9820.01 Power Distribution Limits surveillance.
INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.
CAUTION
&sect; Do NOT shine any type light into a panel.
                &sect;   All pre-job briefings are completed.
                &sect;   Do NOT shine any type light into a panel.
: 1. You are the CRS. Review the completed surveillance data sheet, CPS No. 9820.01D001, Power Distribution Limits Data Sheet.
: 1. You are the CRS. Review the completed surveillance data sheet, CPS No. 9820.01D001, Power Distribution Limits Data Sheet.
: 2. Take any required actions.
: 2. Take any required actions.
The evaluator will act as all other crew members.
The evaluator will act as all other crew members.
START TIME:
START TIME:
Page 6 of 11


JPM Number: JPM425 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 7 of 11 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS 9820.01D001 Power Distribution Limits Data Sheet
PERFORMANCE STEPS 9820.01D001 Power Distribution Limits Data Sheet
*JPM Step 1 8.3 The examinee reviews the completed datasheet and notes that step 8.3 was incorrectly marked indicating MFLCPR was less than 0.98 when the 3D Monicore case shows a bundle with MFLCPR is greater than 1.00.
  *JPM Step 1       The examinee reviews the completed datasheet and notes that step 8.3 was 8.3    incorrectly marked indicating MFLCPR was less than 0.98 when the 3D Monicore case shows a bundle with MFLCPR is greater than 1.00.
Standard: CRS determines that the data sheet was not correctly filled out and MFLCPR is out of specification.
Standard:           CRS determines that the data sheet was not correctly filled out and MFLCPR is out of specification.
Cue: Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number 9820.01D001 Power Distribution Limits Data Sheet
Cue:
*JPM Step 2 8.4 The examinee reviews the completed datasheet and notes that step 8.4 was incorrectly marked indicating MFL PD was less than 0.98 when the 3D Monicore case shows a bundle with MFL PD is greater than 1.00.
Comments SAT &#xa3;               UNSAT &#xa3;                 Comment Number 9820.01D001 Power Distribution Limits Data Sheet
Standard: CRS determines that the data sheet was not correctly filled out and MFLPD is out of specification.
  *JPM Step 2       The examinee reviews the completed datasheet and notes that step 8.4 was 8.4    incorrectly marked indicating MFLPD was less than 0.98 when the 3D Monicore case shows a bundle with MFLPD is greater than 1.00.
Cue: Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number
Standard:           CRS determines that the data sheet was not correctly filled out and MFLPD is out of specification.
Cue:
Comments SAT &#xa3;               UNSAT &#xa3;                 Comment Number Page 7 of 11
 
JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
  *JPM Step 3  Technical Specifications - Minimum Critical Power Ratio (MCPR)


JPM Number:  JPM425 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
====3.2.2 Standard====
Page 8 of 11  *JPM Step 3 3.2.2 Technical Specifications
The examinee reviews Technical Specifications and enters Action 3.2.2 A.1 -
- Minimum Critical Power Ratio (MCPR)
Restore MCPR to within limits within 2 hours.
Standard: The examinee reviews Technical Specification s and enters Action 3.2.2 A.1 - Restore MCP R to within limits within 2 hours. Cue: Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number
Cue:
  *JPM Step 4 3.2.3 Technical Specifications  
Comments SAT &#xa3;           UNSAT &#xa3;             Comment Number
- Linear Heat Generation Rate (LHGR) Standard: The examinee reviews Technical Specification s and enters Action 3.2.3 A.1
  *JPM Step 4   Technical Specifications - Linear Heat Generation Rate (LHGR)
- Restore LHGR to within limits within 2 hours. Cue:  Comments  SAT  &#xa3; UNSAT  &#xa3; Comment Number 


JPM Number: JPM425 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
====3.2.3 Standard====
Page 9 of 11  JPM Step 5 Examinee contacts RE for instructions to restore MFLCPR and MFLPD to within limits within 2 hours.
The examinee reviews Technical Specifications and enters Action 3.2.3 A.1 -
Standard: Examinee contacts the RE for instructions.
Restore LHGR to within limits within 2 hours.
Cue: If the examinee consults with the RE, tell him/her that the RE's are determining an appropriate course of action to restore MFLCPR and MFLPD to within limit s. Comments If the examinee requires a new 3D case, cue him/her that values are identical to the case used for the surveillance. SAT   &#xa3; UNSAT   &#xa3; Comment Number JPM Step 6 Examinee notifies the Shift Manager that MFLCPR and MFLPD are outside Technical Specification Limits
Cue:
. Standard: Examinee notifies the Shift Manager that the ITS limits for MCPR and LHGR have been exceeded and that ITS LCO 3.2.2 A.1 and 3.2.3 A.1 have been entered.
Comments SAT &#xa3;            UNSAT &#xa3;              Comment Number Page 8 of 11
Cue: Acknowledge report from the examinee.
 
Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number TERMINATING CUES:
JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM Step 5   Examinee contacts RE for instructions to restore MFLCPR and MFLPD to within limits within 2 hours.
Standard:       Examinee contacts the RE for instructions.
Cue:             If the examinee consults with the RE, tell him/her that the REs are determining an appropriate course of action to restore MFLCPR and MFLPD to within limits.
Comments         If the examinee requires a new 3D case, cue him/her that values are identical to the case used for the surveillance.
SAT &#xa3;             UNSAT &#xa3;               Comment Number JPM Step 6   Examinee notifies the Shift Manager that MFLCPR and MFLPD are outside Technical Specification Limits.
Standard:       Examinee notifies the Shift Manager that the ITS limits for MCPR and LHGR have been exceeded and that ITS LCO 3.2.2 A.1 and 3.2.3 A.1 have been entered.
Cue:             Acknowledge report from the examinee.
Comments SAT &#xa3;             UNSAT &#xa3;               Comment Number TERMINATING CUES:
The JPM is complete when the student has determined that the MFLCPR and MFLPD limit has been exceeded and determines the appropriate Technical Specification actions that are required.
The JPM is complete when the student has determined that the MFLCPR and MFLPD limit has been exceeded and determines the appropriate Technical Specification actions that are required.
STOP TIME:
STOP TIME:
Page 9 of 11
 
JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
 
==Title:==
&#xa3; EO              &#xa3; RO                &#xa3; SRO            &#xa3; STA          &#xa3; SRO Cert JPM
 
==Title:==
Review Surveillance 9820.01 Power Distribution Limits JPM Number:      JPM425                                                        Revision Number: 01 Task Number and


JPM Number:  JPM425 - Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
==Title:==
SRRS: 3D.105 (when utilized for operator initial or continuing training)
(101100.01) Apply the administrative requirements of SURVEILLANCE TESTING PROGRAM K/A System         K/A Number                     Importance (RO/SRO)
Page 10 of 11 Operator's Name:
Generic               2.1.7                     N/A                 4.7 Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.
Job Title:
Suggested Testing Environment:                 Simulator Actual Testing Environment:               &#xa3; Simulator             &#xa3; Plant         &#xa3; Control Room Testing Method:         &#xa3; Simulate                     Alternate Path:       &#xa3; Yes       &#xa2; No
&#xa3;  EO &#xa3;  RO &#xa3;  SRO &#xa3;  STA &#xa3;  SRO Cert JPM Title:
                          &#xa2; Perform                           SRO Only:       &#xa2; Yes       &#xa3; No Time Critical:       &#xa3; Yes           &#xa2; No Estimated Time to Complete:           10 minutes                 Actual Time Used:             minutes
Review Surveillance 9820.01 Power Distribution Limits JPM Number:
J PM 425 Revision Number:
0 1 Task Number and Title:
(101100.01) Apply the administrative requirements of SURVEILLANCE TESTING PROGRAM K/A System K/A Number Importance (RO/SRO)
Generic 2.1.7 N/A 4.7 Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.
Suggested Testing Environment:
Simulator Actual Testing Environment:
&#xa3;   Simulator &#xa3; Plant &#xa3; Control Room Testing Method:
&#xa3; Simulate Alternate Path:
&#xa3; Yes &#xa2; No   &#xa2; Perform SRO Only: &#xa2; Yes &#xa3; No Time Critical:
&#xa3; Yes &#xa2; No Estimated Time to Complete:
10 minutes Actual Time Used:
minutes  


==References:==
==References:==
 
CPS No. 9820.01 Power Distribution Limits, Revision 34.
CPS No. 9820.01 Power Distribution Limits, Revision
CPS No. 9820.01D001 Power Distribution Limits Data Sheet, Revision 32e.
: 34. CPS No. 9820.01D001 Power Distribution Limits Data Sheet, Revision 32e.
EVALUATION  
EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                 &#xa3; Yes       &#xa3; No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             &#xa3; Satisfactory             &#xa3; Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                              (Print)
&#xa3; Yes &#xa3; No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Signature:                                                              Date:
&#xa3; Satisfactory
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            Page 10 of 11
&#xa3; Unsatisfactory Comments:


Evaluator's Name:
(Print)
Evaluator's Signature:
Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 11 of 11  INITIAL CONDITIONS:
INITIAL CONDITIONS:
The unit is at full power. A rod shuffle was completed one hour ago. The B RO has just completed 9820.01 Power Distribution Limits surveillance.
The unit is at full power. A rod shuffle was completed one hour ago. The B RO has just completed 9820.01 Power Distribution Limits surveillance.
INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.
CAUTION
&sect; Do NOT shine any type light into a panel.
                &sect;   All pre-job briefings are completed.
                &sect;   Do NOT shine any type light into a panel.
: 1. You are the CRS. Review the completed surveillance data sheet, CPS No. 9820.01D001, Power Distribution Limits Data Sheet.
: 1. You are the CRS. Review the completed surveillance data sheet, CPS No. 9820.01D001, Power Distribution Limits Data Sheet.
: 2. Take any required actions.
: 2. Take any required actions.
The evaluator will act as all other crew members.
The evaluator will act as all other crew members.
Page 11 of 11


JPM483_R0 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure Evaluation of Work Hours IAW 10CFR26 JPM Number: JPM483 Revision Number: 0 0 Date: 8/24/16 Developed By:
CLINTON POWER STATION Job Performance Measure Evaluation of Work Hours IAW 10CFR26 JPM Number: JPM483 Revision Number: 00 Date: 8/24/16 Developed By:         T. Jennings                       8/24/16 Instructor                       Date Validated By:         Matt Baker                       10/26/16 SME or Instructor                 Date Reviewed By:         Jim Lucas                         11/15/16 Operations Representative         Date Approved By:         T. Jennings                       11/15/16 Training Department               Date JPM483_R0 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111
T. Jennings 8/24/16   Instructor Date Validated By:
 
Matt Baker 10/26/16   SME or Instructor Date Reviewed By:
JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Jim Lucas 11/15/16   Operations Representative Date Approved By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
T. Jennings 11/15/16   Training Department Date JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review. ________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
Procedure LS-AA-119________
(*).
Rev: 12 Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 10. Verify performance time is accurate
Procedure LS-AA-119________ Rev: 12 Procedure                           Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Procedure                           Rev:
________     9. Verify cues both verbal and visual are free of conflict.
________     10. Verify performance time is accurate
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date Page 2 of 9


SME / Instructor Date SME / Instructor Date SME / Instructor Date JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 9 Revision Record (Summary)
Revision Record (Summary)
Revision Date Description 00 8/24/16 New JPM.
Revision Date                           Description 00     8/24/16 New JPM.
JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 9
Page 4 of 9 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
 
TASK STANDAR DS:
JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)
* Examinee determines that LS
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
-AA-119 work hour limits will be exceeded and reports findings to the Shift Manager.
TASK STANDARDS:
* Examinee determines that LS-AA-119 work hour limits will be exceeded and reports findings to the Shift Manager.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
* LS-AA-119 Rev. 1 2 Fatigue Management and Work Hour Limits EVALUATOR INSTRUCTIONS:
* LS-AA-119 Rev. 12 Fatigue Management and Work Hour Limits EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
* All pre-job briefings are completed.
* Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
* Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
* Provide the examinee with the following items when requested:
* Provide the examinee with the following items when requested:
o LS-AA-119 Fatigue Management and Work Hour Limits
o   LS-AA-119 Fatigue Management and Work Hour Limits Page 4 of 9


JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 9  INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is in Mode 1.
The plant is in Mode 1.
INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.
CAUTION
You are a Shift Supervisor on an operating cr ew. Review the proposed work schedule for the upcoming six weeks and determine if the requirements of LS-AA-119 Fatigue Management and Work Hour Limits will be met if implemented as written and report results to the Shift Manager.
              &sect; All pre-job briefings are completed.
SUN MON TUE WED THU FRI SAT Week 1 X D D D X X X Week 2 X X X D D D D Week 3 D R D X X N N Week 4 N N X R R R X Week 5 X X N N N X X Week 6 X T T T T T N X = Day Off D = 12 Hour Day N = 12 Hour Night (Starts at 190 0 on previous day)
You are a Shift Supervisor on an operating crew.
R = 8 Hour Relief Shift T = 8 Hour Training Day START TIME:
Review the proposed work schedule for the upcoming six weeks and determine if the requirements of LS-AA-119 Fatigue Management and Work Hour Limits will be met if implemented as written and report results to the Shift Manager.
 
SUN         MON           TUE       WED     THU     FRI         SAT Week 1         X           D           D         D       X       X           X Week 2         X           X           X         D       D       D           D Week 3         D             R           D         X       X       N           N Week 4         N             N           X         R       R       R           X Week 5         X           X           N         N       N       X           X Week 6         X           T             T         T       T       T           N X = Day Off D = 12 Hour Day N = 12 Hour Night (Starts at 1900 on previous day)
JPM Number:  JPM483  - rev 00  Clinton Power Station Job Performance Measure (JPM)
R = 8 Hour Relief Shift T = 8 Hour Training Day START TIME:
Page 6 of 9 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
Page 5 of 9
PERFORMANCE STEPS LS-AA-119 Fatigue Management and Work Hour Limits STEP ELEMENT STANDARD SAT UNSAT Comment Number 1 Determine s 10 CFR 26 Work Hour Limits
. Locates and reviews LS
-AA-119 section 5.1.1 10CFR26 Work Hour Limits
. 2 Reviews Week 1 of the proposed schedule. 5.1.1 Determines that the scheduled hours will not violate 10CFR26 work hour limits.
3 Reviews Week 2 of the proposed schedule. 5.1.1 Determines that the scheduled hours will not violate 10CFR26 work hour limits.
4 Reviews Week 3 of the proposed schedule. *5.1.1 Determines that the scheduled 80 hours from Week 2 Wednesday to Week 3 on Tuesday will violate 10CFR26 work hour limit of 72 hours in a 7-day period
. Evaluator Cue
- When reported, acknowledge the report and cue the examinee to complete the schedule review. 5 Reviews Week 4 of the proposed schedule. 5.1.1 Determines that the scheduled hours will
 
not violate 10CFR26 work hour limits. 6 Reviews Week 5 of the proposed schedule. 5.1.1 Determines that the scheduled hours will


not violate 10CFR26 work hour limits.
JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS LS-AA-119 Fatigue Management and Work Hour Limits Comment SAT    UNSAT STEP              ELEMENT                                STANDARD Number Determines 10 CFR 26 Work          Locates and reviews LS-AA-119 section 1
Hour Limits.                        5.1.1 10CFR26 Work Hour Limits.
2          Reviews Week 1 of the proposed      5.1.1 schedule.                          Determines that the scheduled hours will not violate 10CFR26 work hour limits.
3          Reviews Week 2 of the proposed      5.1.1 schedule.                          Determines that the scheduled hours will not violate 10CFR26 work hour limits.
4          Reviews Week 3 of the proposed      *5.1.1 schedule.                          Determines that the scheduled 80 hours from Week 2 Wednesday to Week 3 on Tuesday will violate 10CFR26 work hour limit of 72 hours in a 7-day period.
Evaluator Cue - When reported, acknowledge the report and cue the examinee to complete the schedule review.
5          Reviews Week 4 of the proposed      5.1.1 schedule.                          Determines that the scheduled hours will not violate 10CFR26 work hour limits.
6          Reviews Week 5 of the proposed      5.1.1 schedule.                          Determines that the scheduled hours will not violate 10CFR26 work hour limits.
Page 6 of 9


JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 7 of 9 STEP ELEMENT STANDARD SAT UNSAT Comment Number 7 Reviews Week 6 of the proposed schedule. *5.1.1 Determines that the scheduled hours will violate the following 10CFR26 work hour limit s:
Comment SAT    UNSAT STEP             ELEMENT                               STANDARD Number 7           Reviews Week 6 of the proposed     *5.1.1 schedule.                          Determines that the scheduled hours will violate the following 10CFR26 work hour limits:
* 16 in 24 (0700 on Friday until 0700 on Saturday = 20 hours in a 24 hour period), or
* 16 in 24 (0700 on Friday until 0700 on Saturday = 20 hours in a 24 hour period), or
* 26 in 48 (0700 on Thursday until 0700 on Saturday = 28 hours in a 48 hour period), or
* 26 in 48 (0700 on Thursday until 0700 on Saturday = 28 hours in a 48 hour period), or
* 10 hour break between successive work periods (the transition from training on Friday to night shift on Saturday is 4 hours)
* 10 hour break between successive work periods (the transition from training on Friday to night shift on Saturday is 4 hours)
Evaluator Note  
Evaluator Note - the 10 hour break requirement drives the violation of the 16 in 24 and 26 in 48 hour requirements, so stating a violation of any one of the three limits above constitutes satisfactory performance of the step.
- the 10 hour break requirement drives the violation of the 16 in 24 and 26 in 48 hour requirements, so stating a violation of any one of the three limits above constitutes satisfactory performance of the step.
Evaluator Cue - When reported, acknowledge the report and cue the examinee that the JPM is complete.
Evaluator Cue  
- When reported, acknowledge the report and cue the examinee that the JPM is complete.
TERMINATING CUES:
TERMINATING CUES:
Candidate completes review of the proposed work schedule and reports identified issues to the Shif t Manager. STOP TIME:
Candidate completes review of the proposed work schedule and reports identified issues to the Shift Manager.
STOP TIME:
Page 7 of 9


JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Operators Name:
Page 8 of 9 Operator's Name:
Job
Job Title:
 
&#xa3; EO &#xa3; RO &#xa3; SRO &#xa3; STA &#xa3; SRO Cert JPM Title:
==Title:==
Evaluation of Work Hours IAW 10CFR26 JPM Number:
&#xa3; EO               &#xa3; RO               &#xa3; SRO           &#xa3; STA         &#xa3; SRO Cert JPM
JPM 4 83 Revision Number:
 
0 0 Task Number and Title:
==Title:==
999999.25 Prepare a Minimum Shift Complement Form K/A System K/A Number Importance (RO/SRO)
Evaluation of Work Hours IAW 10CFR26 JPM Number:     JPM483                                                        Revision Number: 00 Task Number and
Generic 2.1.5 3.9 Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.
 
Suggested Testing Environment:
==Title:==
Classroom Actual Testing Environment:
999999.25 Prepare a Minimum Shift Complement Form K/A System         K/A Number                     Importance (RO/SRO)
&#xa3; Simulator &#xa3; Plant &#xa3; Control Room Testing Method:
Generic               2.1.5                                         3.9 Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.
&#xa3; Simulate Alternate Path:
Suggested Testing Environment:                 Classroom Actual Testing Environment:               &#xa3; Simulator             &#xa3; Plant         &#xa3; Control Room Testing Method:         &#xa3; Simulate                     Alternate Path:       &#xa3; Yes       &#xa2; No
&#xa3; Yes &#xa2; No   &#xa2; Perform SRO Only: &#xa2; Yes &#xa3; No Time Critical:
                          &#xa2; Perform                           SRO Only:       &#xa2; Yes       &#xa3; No Time Critical:       &#xa3; Yes           &#xa2; No Estimated Time to Complete:           15 minutes                 Actual Time Used:             minutes
&#xa3; Yes &#xa2; No Estimated Time to Complete:
1 5 minutes Actual Time Used:
minutes  


==References:==
==References:==
 
LS-AA-119, Rev. 12, Fatigue Management and Work Hour Limits EVALUATION  
LS-AA-119, Rev. 1 2, Fatigue Management and Work Hour Limits EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                 &#xa3; Yes       &#xa3; No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             &#xa3; Satisfactory             &#xa3; Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                              (Print)
&#xa3; Yes &#xa3; No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Signature:                                                              Date:
&#xa3; Satisfactory
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            Page 8 of 9
&#xa3; Unsatisfactory Comments:


Evaluator's Name:
(Print)
Evaluator's Signature:
Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 9 of 9  INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is in Mode 1.
The plant is in Mode 1.
INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.
CAUTION
You are a Shift Supervisor on an operating crew. Review the proposed work schedule for the upcoming six weeks and determine if the requirements of LS-AA-119 Fatigue Management and Work Hour Limits will be met if implemented as written and report results to the Shift Manager.
              &sect; All pre-job briefings are completed.
SUN MON TUE WED THU FRI SAT Week 1 X D D D X X X Week 2 X X X D D D D Week 3 D R D X X N N Week 4 N N X R R R X Week 5 X X N N N X X Week 6 X T T T T T N X = Day Off D = 12 Hour Day N = 12 Hour Night (Starts at 190 0 on previous day)
You are a Shift Supervisor on an operating crew.
R = 8 Hour Relief Shift T = 8 Hour Training Day
Review the proposed work schedule for the upcoming six weeks and determine if the requirements of LS-AA-119 Fatigue Management and Work Hour Limits will be met if implemented as written and report results to the Shift Manager.
SUN         MON           TUE       WED     THU   FRI           SAT Week 1         X           D           D         D       X     X             X Week 2         X           X           X         D       D     D             D Week 3         D             R           D         X       X     N             N Week 4         N             N           X         R       R     R             X Week 5         X           X           N         N       N     X             X Week 6         X           T             T         T       T     T             N X = Day Off D = 12 Hour Day N = 12 Hour Night (Starts at 1900 on previous day)
R = 8 Hour Relief Shift T = 8 Hour Training Day Page 9 of 9
 
CLINTON POWER STATION Job Performance Measure Tech Spec Call / Clearance Approval JPM Number: JPM469 Revision Number: 01 Date: 7/8/16 Developed By:          T. Jennings                        7/8/16 Instructor                          Date Validated By:        Brian Glynn                        10/26/16 SME or Instructor                  Date Reviewed By:          Jim Lucas                          11/15/16 Operations Representative          Date Approved By:          T. Jennings                        11/15/16 Training Department                Date JPM469_R1 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111


JPM469_R1 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure Tech Spec Call / Clearance Approval JPM Number:  JPM469 Revision Number: 0 1 Date:  7/8/16 Developed By:
JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)
T. Jennings 7/8/16  Instructor Date  Validated By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Brian Glynn 10/26/16  SME or Instructor  Date  Reviewed By:
Jim Lucas  11/15/16  Operations Representative Date  Approved By:
T. Jennings 11/15/16  Training Department Date JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review. ________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
Procedure OP-AA-109-101 Rev: 1 2  Procedure CPS 3309.01E0 01  Rev: 8 Procedure CPS 3309.01V001 Rev: 11b Procedure M05-1074 SH001 Rev: AH Procedure E02-1HP99 SH110 Rev: H Procedure E02-1HP99 SH505 Rev: N ________ 9. Verify cues both verbal and visual are free of conflict.
(*).
________ 10. Verify performance time is accurate
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Procedure OP-AA-109-101             Rev: 12 Procedure CPS 3309.01E001          Rev: 8 Procedure CPS 3309.01V001           Rev: 11b Procedure M05-1074 SH001           Rev: AH Procedure E02-1HP99 SH110 Rev: H Procedure E02-1HP99 SH505 Rev: N
________     9. Verify cues both verbal and visual are free of conflict.
________     10. Verify performance time is accurate
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date Page 2 of 10


SME / Instructor Date SME / Instructor Date SME / Instructor Date JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 10 Revision Record (Summary)
Revision Record (Summary)
Revision Date Description 00 6/15/15 New JPM. 01 7/8/16 Updated procedure references.
Revision   Date                           Description 00     6/15/15 New JPM.
01     7/8/16 Updated procedure references.
Page 3 of 10


JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 4 of 10 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
TASK STANDARDS:
:
* Candidate reviews the Technical Specifications and determines the correct Technical Specification Action requirement(s).
* Candidate reviews the Technical Specifications and determines the correct Technical Specification Action requirement(s).
* Candidate reviews the Clearance Order Checklist and determines:
* Candidate reviews the Clearance Order Checklist and determines:
o that compartment/circuit breaker AB MCC 1C COMPT 2C (1E22
o that compartment/circuit breaker AB MCC 1C COMPT 2C (1E22-S002/2C) for HPCS Water Leg Pump 1E22-C003 must be added to the Clearance Order Checklist.
-S002/2C) for HPCS Water Leg Pump 1E22
o that EIN 1E22F356 is incorrect for the HPCS WTR LEG PUMP TEST LINE ISOL and that the correct EIN for the HPCS WTR LEG PUMP TEST LINE ISOL is 1E22F351.
-C003 must be added to the Clearance Order Checklist
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
. o that EIN 1E22F356 is incorrect for the HPCS WTR LEG PUMP TEST LINE ISOL and that the correct EIN for the HPCS WTR LEG PUMP TEST LINE ISOL is 1E22F351
. TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
* OP-AA-109-101, Rev 1 2 CLEARANCE AND TAGGING
* OP-AA-109-101, Rev 12 CLEARANCE AND TAGGING
* CPS 3309.01E001, Rev 008, HIGH PRESSURE CORE SPRAY ELECTRICAL LINEUP
* CPS 3309.01E001, Rev 008, HIGH PRESSURE CORE SPRAY ELECTRICAL LINEUP
* CPS 3309.01V001, Rev 011 B, HIGH PRESSURE CORE SPRAY VALVE LINEUP
* CPS 3309.01V001, Rev 011 B, HIGH PRESSURE CORE SPRAY VALVE LINEUP
* M05-107 4 Sheet 00 1, Rev A H HIGH PRESSURE CORE SPRAY (HP)
* M05-1074 Sheet 001, Rev AH HIGH PRESSURE CORE SPRAY (HP)
* E02-1HP99 Sheet 110, Rev H HPCS Power Supply System
* E02-1HP99 Sheet 110, Rev H HPCS Power Supply System
* E02-1 HP99 Sheet 505, Rev N HPCS WATER LEG PUMP (1E22
* E02-1HP99 Sheet 505, Rev N HPCS WATER LEG PUMP (1E22-C003) AND (DIV 3)
-C003) AND (DIV 3)
EVALUATOR INSTRUCTIONS:
EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
* After providing the initiating cue, provide the examinee with a copy of
* After providing the initiating cue, provide the examinee with a copy of:
: o Clearance Order Checklist o OP-AA-109-101, Rev 1 2 CLEARANCE AND TAGGING
o Clearance Order Checklist o OP-AA-109-101, Rev 12 CLEARANCE AND TAGGING
* Allow candidate access to the remaining PROCEDURAL/REFERENCES listed above.
* Allow candidate access to the remaining PROCEDURAL/REFERENCES listed above.
Page 4 of 10


JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 10  INITIAL CONDITIONS:
INITIAL CONDITIONS:
* The plant is operating at rated power
* The plant is operating at rated power.
.
* The High Pressure Core Spray (HPCS) Water Leg Pump was secured due to a report of a leak.
* The High Pressure Core Spray (HPCS) Water Leg Pump was secured due to a report of a l eak.
* HPCS Pump Breaker control power fuses were removed IAW CPS 3309.01 HIGH PRESSURE CORE SPRAY (HPCS).
* HPCS Pump Breaker control power fuses were removed IAW CPS 3309.01 HIGH PRESSURE CORE SPRAY (HPCS).
* A Clearance Order Checklist has been prepared to isolate the HPCS Water Leg Pump leak and facilitate repairs.
* A Clearance Order Checklist has been prepared to isolate the HPCS Water Leg Pump leak and facilitate repairs.
INITIATING CUE:
INITIATING CUE:
As CRS you are tasked to:
As CRS you are tasked to:
* Provide an independent Tech Spec call based on the conditions above
* Provide an independent Tech Spec call based on the conditions above.
.
* Review the prepared Clearance Order Checklist for approval (Passport is NOT available).
* Review the prepared Clearance Order Checklist for approval (Passport is NOT available).
START TIME:
START TIME:
Page 5 of 10
 
JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS Technical Specifications
            *1. The candidate reviews the Technical Specifications and determines the correct Technical Specification Action requirement.
Standard:          Determines the required action is TS 3.5.1 Action B.1 and B.2.
Cue:
Comments SAT &#xa3;            UNSAT &#xa3;                  Comment Number Page 6 of 10


JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 10 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
Clearance Order Checklist OP-AA-109-101, Rev 12 Clearance And Tagging HPCS Water Leg Pump Drawing (E02-1HP99 Sheet 505) or equivalent
PERFORMANCE STEPS  Technical Specifications
          *2. The candidate reviews the Clearance Order Checklist and determines that the electrical isolation of the HPCS Water Leg Pump is incomplete. The HPCS Water Leg Pump Breaker must be added to the Clearance Order Checklist.
*1. The candidate reviews the Technical Specifications and determines the correct Technical Specification Action requirement.
Standard:      Determines that compartment/circuit breaker AB MCC 1C COMPT 2C (1E22-S002/2C) for HPCS Water Leg Pump 1E22-C003 must be added to the Clearance Order Checklist.
Standard: Determines the required action is TS 3.5.1 Action B.1 and B.2. Cue: Comments   SA T  &#xa3; UNSAT   &#xa3; Comment Number
Cue:            None Comments SAT &#xa3;                UNSAT &#xa3;              Comment Number Clearance Order Checklist High Pressure Core Spray (HP) Drawing (M05-1074 Sheet 001)
          *3. The candidate reviews the Clearance Order Checklist and determines that the Equipment Identification Number (EIN) listed for the HPCS WTR LEG PUMP TEST LINE ISOL is incorrect.
Standard:       Determines that EIN 1E22F356 is incorrect for the HPCS WTR LEG PUMP TEST LINE ISOL and that the correct EIN for the HPCS WTR LEG PUMP TEST LINE ISOL is 1E22F351.
Cue:           None Comments SAT &#xa3;               UNSAT &#xa3;             Comment Number Page 7 of 10


JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 7 of 10  Clearance Order Checklist OP-AA-109-101, Rev 1 2 Clearance A nd Tagging HPCS Water L eg Pump Drawing (E02-1HP99 Sheet 505
: 4. Task Completion Standard:    Review is complete.
) or equivalent
Cue:         JPM is complete.
*2. The candidate reviews the Clearance Order Checklist and determines that the electrical isolation of the HPCS Water Leg Pump is incomplete. The HPCS Water Leg Pump Breaker must be added to the Clearance Order Checklist
Comments SAT &#xa3;             UNSAT &#xa3;             Comment Number STOP TIME:
. Standard: Determines that compartment/circuit breaker AB MCC 1C COMPT 2C (1E22
Page 8 of 10
-S002/2C) for HPCS Water Leg Pump 1E 22-C003 must be added to the Clearance Order Checklist
. Cue: None Comments  SAT  &#xa3; UNSAT  &#xa3; Comment Number Clearance Order Checklist High Pressure Core Spray (HP) Drawing (M05-1074 Sheet 001)
*3. The candidate reviews the Clearance Order Checklist and determines that the Equipment Identification Number (EIN) listed for the HPCS WTR LEG PUMP TEST LINE ISOL is incorrect
. Standard: Determines that EIN 1E22F356 is incorrect for the HPCS WTR LEG PUMP TEST LINE ISOL and that the correct EIN for the HPCS WTR LEG PUMP TEST LINE ISOL is 1E22F351
. Cue: None Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number


JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 8 of 10 4. Task Completion Standard: Review is complete.
Operators Name:
Cue: JPM is complete.
Job
Comments  SAT  &#xa3; UNSAT  &#xa3; Comment Number 


STOP TIME:
==Title:==
&#xa3; EO              &#xa3; RO                &#xa3; SRO            &#xa3; STA          &#xa3; SRO Cert JPM


JPM Number:  JPM469  - rev 01  Clinton Power Station Job Performance Measure (JPM)
==Title:==
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Tech Spec Call / Clearance Approval JPM Number:     JPM469                                                        Revision Number: 00 Task Number and
Page 9 of 10 Operator's Name:
 
Job Title:
==Title:==
&#xa3;  EO &#xa3;  RO &#xa3;  SRO &#xa3;  STA &#xa3;  SRO Cert JPM Title:
140109.23 Apply the administrative requirements for Execution of Technical Specifications or Off-Site Dose Calculation Manual Requirements.
Tech Spec Call / Clearance Approval JPM Number:
K/A System         K/A Number                     Importance (RO/SRO)
JPM 469 Revision Number:
Generic               2.2.40                    3.4                 4.7 Suggested Testing Environment:                 Simulator Actual Testing Environment:               &#xa3; Simulator             &#xa3; Plant         &#xa3; Control Room Testing Method:         &#xa3; Simulate                     Alternate Path:       &#xa3; Yes       &#xa2; No
0 0 Task Number and Title:
                          &#xa2; Perform                           SRO Only:       &#xa2; Yes       &#xa3; No Time Critical:       &#xa3; Yes           &#xa2; No Estimated Time to Complete:           25 minutes                 Actual Time Used:             minutes
140109.23 Apply the administrative requirements for Execution of Technical Specifications or Off
-Site Dose Calculation Manual Requirements.
K/A System K/A Number Importance (RO/SRO)
Generic 2.2.4 0 3.4 4.7 Suggested Testing Environment:
Simulator Actual Testing Environment:
&#xa3;   Simulator &#xa3; Plant &#xa3; Control Room Testing Method:
&#xa3; Simulate Alternate Path:
&#xa3; Yes &#xa2; No   &#xa2; Perform SRO Only: &#xa2; Yes &#xa3; No Time Critical:
&#xa3; Yes &#xa2; No Estimated Time to Complete:
2 5 minutes Actual Time Used:
minutes  


==References:==
==References:==
See page 4 of 10.
See page 4 of 10.
EVALUATION  
EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                 &#xa3; Yes       &#xa3; No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             &#xa3; Satisfactory             &#xa3; Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                              (Print)
&#xa3; Yes &#xa3; No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Signature:                                                              Date:
&#xa3; Satisfactory
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            Page 9 of 10
&#xa3; Unsatisfactory Comments:


Evaluator's Name:
(Print)
Evaluator's Signature:
Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 10 of 10  INITIAL CONDITIONS:
INITIAL CONDITIONS:
* The plant is operated at rated power
* The plant is operated at rated power.
.
* The High Pressure Core Spray (HPCS) Water Leg Pump was secured due to a report of a leak.
* The High Pressure Core Spray (HPCS) Water Leg Pump was secured due to a report of a leak.
* HPCS Pump Breaker control power fuses were removed IAW CPS 3309.01 HIGH PRESSURE CORE SPRAY (HPCS).
* HPCS Pump Breaker control power fuses were removed IAW CPS 3309.01 HIGH PRESSURE CORE SPRAY (HPCS).
Line 1,074: Line 1,056:
* Provide an independent Tech Spec call based on the conditions above.
* Provide an independent Tech Spec call based on the conditions above.
* Review the prepared Clearance Order Checklist for approval (Passport is NOT available).
* Review the prepared Clearance Order Checklist for approval (Passport is NOT available).
Page 10 of 10


Retain approved Master Copy per SRRS 3D.126/3D.111 JPM536_R1 Facility Approved.doc CLINTON POWER STATION Job Performance Measure Review CPS 9038.70 Radiation Monitoring Source Check Surveillance JPM Number: JPM536 Revision Number: 0 1 Date: 8/23/16 Developed By:
CLINTON POWER STATION Job Performance Measure Review CPS 9038.70 Radiation Monitoring Source Check Surveillance JPM Number: JPM536 Revision Number: 01 Date: 8/23/16 Developed By:         T. Jennings                       8/23/16 Instructor                         Date Validated By:         Brian Glynn                       10/26/16 SME or Instructor                 Date Reviewed By:         Jim Lucas                         11/15/16 Operations Representative         Date Approved By:         T. Jennings                       11/15/16 Training Department               Date Retain approved Master Copy per SRRS 3D.126/3D.111 JPM536_R1 Facility Approved.doc
T. Jennings 8/23/16   Instructor Date Validated By:
 
Brian Glynn 10/26/16   SME or Instructor Date Reviewed By:
JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Jim Lucas 11/15/16   Operations Representative Date Approved By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
T. Jennings 11/15/16   Training Department Date JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 2 of 12 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included. ________ 3. Performance location specified. (in
________     2. Knowledge and Abilities (K/A) references are included.
-plant, control room, simulator, or other)
________     3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________     4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________     6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
Procedure CY-CL-170-301 Rev: 2 5  Procedure CPS 9038.70 Rev: 3 e  Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
(*).
________ 10. Verify performance time is accurate
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Procedure CY-CL-170-301             Rev: 25 Procedure CPS 9038.70               Rev: 3e Procedure                           Rev:
________     9. Verify cues both verbal and visual are free of conflict.
________     10. Verify performance time is accurate
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date Page 2 of 12


SME / Instructor Date SME / Instructor Date SME / Instructor Date JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 12 Revision Record (Summary)
Revision Record (Summary)
Revision Date Description 00 10/9/14 New JPM. 01 8/23/16 Updated procedure references.
Revision Date                           Description 00     10/9/14 New JPM.
01     8/23/16 Updated procedure references.
Page 3 of 12


JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 4 of 12 Simulator Setup Instructions
Simulator Setup Instructions
: 1. No simulator setup is required for this JPM.
: 1. No simulator setup is required for this JPM.
: 2. This JPM should be conducted in a location that provides easy access to the required reference procedures (simulator, library, SM office, etc.).
: 2. This JPM should be conducted in a location that provides easy access to the required reference procedures (simulator, library, SM office, etc.).
: 3. The following procedures are required to be available should the candidate request them:
: 3. The following procedures are required to be available should the candidate request them:
: a. CY-CL-170-301 Offsite Dose Calculation Manual
: a. CY-CL-170-301 Offsite Dose Calculation Manual - Clinton Power Station Page 4 of 12
- Clinton Power Station


JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 12 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
TASK STANDARDS:
:
* ODCM Requirements for 1RIX-PR034 OG Pre-Treatment PRM and 1RIX-PR035/41 OG Post-Treatment PRMs identified.
* ODCM Requirements for 1RIX
-PR034 OG Pre-Treatment PRM and 1RIX-PR035/41 OG Post-Treatment PRMs identified.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* None PROCEDURAL/
* None PROCEDURAL/
Line 1,116: Line 1,101:
==REFERENCES:==
==REFERENCES:==
* CY-CL-170-301 Clinton Power Station Unit 1 Offsite Dose Calculation Manual (ODCM) Rev.
* CY-CL-170-301 Clinton Power Station Unit 1 Offsite Dose Calculation Manual (ODCM) Rev.
2 5
25
* CPS 9038.70 Radiation Monitoring Source Check Surveillance Rev. 3 e EVALUATOR INSTRUCTIONS:
* CPS 9038.70 Radiation Monitoring Source Check Surveillance Rev. 3e EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
* All pre-job briefings are completed.
Page 5 of 12


JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 12  INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is operating at 97% power. NO LCOs are in effect.
The plant is operating at 97% power.
1RIX-PR041 Off Gas Post
NO LCOs are in effect.
-Treatment Monitor is currently NON-FUNCTIONAL for maintenance.
1RIX-PR041 Off Gas Post-Treatment Monitor is currently NON-FUNCTIONAL for maintenance.
The OG Vault Refrigeration (VO) System has been shut down for repairs. The repairs have just been completed, and the VO system is being prepared for startup. The OG Charcoal Beds are in BYPASS to support VO system startup IAW CPS 3407.01 Off-Gas Vault Refrigeration (VO) step 4.1.
The OG Vault Refrigeration (VO) System has been shut down for repairs. The repairs have just been completed, and the VO system is being prepared for startup. The OG Charcoal Beds are in BYPASS to support VO system startup IAW CPS 3407.01 Off-Gas Vault Refrigeration (VO) step 4.1.
CPS 9038.70 Radiation Monitoring Source Check Surveillance has just been completed for the gaseous radiation monitors, OG Pre
CPS 9038.70 Radiation Monitoring Source Check Surveillance has just been completed for the gaseous radiation monitors, OG Pre-treatment process radiation monitor, and the OG Post-Treatment process radiation monitors.
-treatment process radiation monitor, and the OG Post
-Treatment process radiation monitors.
INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.
CAUTION
As an on-shift SRO, perform the supervisory review of CPS 9038.70 Radiation Monitoring Source Check Surveillance
              &sect;   All pre-job briefings are completed.
. START TIME:
As an on-shift SRO, perform the supervisory review of CPS 9038.70 Radiation Monitoring Source Check Surveillance.
START TIME:
Page 6 of 12


JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 7 of 12 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CY-CL-170-301 Clinton Power Station Unit 1 Offsite Dose Calculation Manual 1 Examinee reviews section 5.0 Prerequisites of CPS 9038.
PERFORMANCE STEPS CY-CL-170-301 Clinton Power Station Unit 1 Offsite Dose Calculation Manual 1   Examinee reviews section 5.0 Prerequisites of CPS 9038.70 Radiation Monitoring Source Check Surveillance.
70 Radiation Monitoring Source Check Surveillance
Standard:           Examinee reviews section 5.0 and determines section is filled out correctly.
. Standard: Examinee reviews section 5.0 and determines section is filled out correctly.
Cue:               Provide the examinee with the completed copy of CPS 9038.70 and attached data sheets for this step.
Cue: Provide the examinee with the completed copy of CPS 9038.70 and attached data sheets for this step.
Comments SAT &#xa3;               UNSAT &#xa3;                 Comment Number Page 7 of 12
Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number


JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 8 of 12  *2 Examinee evaluates surveillance data for 1RIX
          *2 Examinee evaluates surveillance data for 1RIX-PR034 Off-Gas Pre-treatment PRM.
-PR034 Off-Gas Pre-treatment PRM.
Standard:   Examinee reviews surveillance data for 1RIX-PR034 and determines the following:
Standard: Examinee reviews surveillance data for 1RIX
* Monitor failed to reach the required value of 1.5 times the current cpm value during the surveillance.
-PR034 and determines the following:
* Monitor failed to reach the required value of 1.5 times the current cpm value during the surveillance
.
* 1RIX-PR034 is NON-FUNCTIONAL per ODCM 3.2.1.
* 1RIX-PR034 is NON-FUNCTIONAL per ODCM 3.2.1.
* 1RIX-PR034 is required to be FUNCTIONAL during operation of the main condenser air ejector(s) per ODCM 3.
* 1RIX-PR034 is required to be FUNCTIONAL during operation of the main condenser air ejector(s) per ODCM 3.2.1.1 Applicability.
2.1.1 Applicability
.
* The following ODCM 3.2.1 Required Actions must be taken:
* The following ODCM 3.2.1 Required Actions must be taken:
o A.1 , C.1, C.2.1.1, and C.2.1.2, OR o A.1, C.1, C.2.2.1, C2.2.2, and C2.2.3 (requires that the OG Charcoal Beds must immediately be placed in service)
o A.1, C.1, C.2.1.1, and C.2.1.2, OR o A.1, C.1, C.2.2.1, C2.2.2, and C2.2.3 (requires that the OG Charcoal Beds must immediately be placed in service)
Cue: If the examinee reports the failure, acknowledge the report and direct the examinee to complete the task.
Cue:         If the examinee reports the failure, acknowledge the report and direct the examinee to complete the task.
If the examinee attempts to check the calculations on the data sheets, inform the examinee that the calculations have already been verified and to assume the calculations are correct.
If the examinee attempts to check the calculations on the data sheets, inform the examinee that the calculations have already been verified and to assume the calculations are correct.
Comments The examinee may perform review steps in any order.
Comments     The examinee may perform review steps in any order.
Per the initiating cue, the OG Charcoal Beds are bypassed to support startup of the OG Vault Refrigeration System.
Per the initiating cue, the OG Charcoal Beds are bypassed to support startup of the OG Vault Refrigeration System.
SAT   &#xa3; UNSAT   &#xa3; Comment Number
SAT &#xa3;               UNSAT &#xa3;               Comment Number Page 8 of 12


JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 9 of 12  *3 Examinee evaluates surveillance data for 1RIX
          *3 Examinee evaluates surveillance data for 1RIX-PR035 Off-gas Post-treatment PRM
-PR035 Off-gas Post-treatment PRM  
            #1.
#1. Standard: Examinee reviews surveillance data for 1RIX
Standard:   Examinee reviews surveillance data for 1RIX-PR035 and determines the following:
-PR035 and determines the following:
* Monitor failed to reach 30 cpm and 1.5 times the current cpm value when the source check was performed.
* Monitor failed to reach 30 cpm and 1.5 times the current cpm value when the source check was performed.
* 1RIX-PR035 is NON-FUNCTIONAL per ODCM 3.
* 1RIX-PR035 is NON-FUNCTIONAL per ODCM 3.2.1.
2.1.
* 1RIX-PR035 or 1RIX-PR041 is required to be FUNCTIONAL during operation of the main condenser air ejector(s) per ODCM 3.2.1 Applicability.
* 1RIX-PR035 or 1RIX-PR041 is required to be FUNCTIONAL during operation of the main condenser air ejector(s) per ODCM 3.
2.1 Applicability
.
* With 1RIX-PR041 already NON-FUNCTIONAL for maintenance, the following ODCM Required Actions must be taken:
* With 1RIX-PR041 already NON-FUNCTIONAL for maintenance, the following ODCM Required Actions must be taken:
o A.1, D.1, and D.2.1, OR o A.1, D.1, D.2.2.1, and D.2.2
o A.1, D.1, and D.2.1, OR o A.1, D.1, D.2.2.1, and D.2.2.2 Cue:         If the examinee reports the failure, acknowledge the report and direct the examinee to complete the task.
.2 Cue: If the examinee reports the failure, acknowledge the report and direct the examinee to complete the task. If the examinee attempts to check the calculations on the data sheets, inform the examinee that the calculations have already been verified and to assume the calculations are correct.
If the examinee attempts to check the calculations on the data sheets, inform the examinee that the calculations have already been verified and to assume the calculations are correct.
Comments The examinee may perform review steps in any order.
Comments     The examinee may perform review steps in any order.
SA T  &#xa3; UNSAT   &#xa3; Comment Number
SAT &#xa3;               UNSAT &#xa3;               Comment Number Page 9 of 12


JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM) 4   Examinee evaluates surveillance data for the remainder of the Gaseous Monitors in the surveillance.
Page 10 of 12  4 Examinee evaluates surveillance data for the remainder of the Gaseous Monitors in the surveillance
Standard:         Examinee reviews surveillance data for each of the remaining gaseous radiation monitors and determines the following:
. Standard: Examinee reviews surveillance data for each of the remaining gaseous radiation monitors and determines the following:
* Each monitor passed channel functional testing with the exception of 0RIX-PR002 HVAC Exhaust PRM #2 Iodine channel.
* Each monitor passed channel functional testing with the exception of 0RIX
* 0RIX-PR002 HVAC Exhaust PRM #2 Iodine Sampler is required to be FUNCTIONAL at all times, and that the non-ODCM failure does not impact functionality.
-PR002 HVAC Exhaust PRM #2 Iodine channel.
Cue:               If the examinee reports the failure, acknowledge the report and direct the examinee to complete the task.
* 0RIX-PR002 HVAC Exhaust PRM #2 Iodine Sampler is required to be FUNCTIONAL at all times, and that the non
If asked, 0RIX-PR001 is in service.
-ODCM failure does not impact functionality
. Cue: If the examinee reports the failure, acknowledge the report and direct the examinee to complete the task.
If asked, 0RIX
-PR001 is in service.
If the examinee attempts to check the calculations on the data sheets, inform the examinee that the calculations have already been verified and to assume the calculations are correct.
If the examinee attempts to check the calculations on the data sheets, inform the examinee that the calculations have already been verified and to assume the calculations are correct.
Comments The examinee may perform review steps in any order.
Comments           The examinee may perform review steps in any order.
SAT   &#xa3; UNSAT   &#xa3; Comment Number TERMINATING CUES:
SAT &#xa3;             UNSAT &#xa3;                   Comment Number TERMINATING CUES:
CPS 9038.70 Radiation Monitoring Source Check Surveillance has been reviewed and ODCM impact has been evaluated and appropriate actions taken
CPS 9038.70 Radiation Monitoring Source Check Surveillance has been reviewed and ODCM impact has been evaluated and appropriate actions taken.
. STOP TIME:
STOP TIME:
Page 10 of 12
 
JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
 
==Title:==
&#xa3; EO              &#xa3; RO                &#xa2; SRO            &#xa3; STA          &#xa3; SRO Cert JPM
 
==Title:==
Review CPS 9038.70 Radiation Monitoring Source Check Surveillance JPM Number:      JPM536                                                        Revision Number: 00 Task Number and


JPM Number:  JPM536  - rev 01  Clinton Power Station Job Performance Measure (JPM)
==Title:==
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 11 of 12 Operator's Name:
Job Title:
&#xa3;  EO &#xa3;  RO &#xa2;  SRO &#xa3;  STA &#xa3;  SRO Cert JPM Title:
Review CPS 9038.70 Radiation Monitoring Source Check Surveillance JPM Number:
JPM 536 Revision Number:
0 0 Task Number and Title:
999999.19 Review the results of Surveillance Tests.
999999.19 Review the results of Surveillance Tests.
K/A System K/A Number Importance (RO/SRO)
K/A System         K/A Number                     Importance (RO/SRO)
Generic 2.3.15 NA 3.1 Knowledge of radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.
Generic               2.3.15                     NA                   3.1 Knowledge of radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.
Suggested Testing Environment:
Suggested Testing Environment:                 Classroom or Simulator Actual Testing Environment:               &#xa3; Simulator             &#xa3; Plant         &#xa3; Control Room Testing Method:         &#xa3; Simulate                     Alternate Path:       &#xa3; Yes       &#xa2; No
Classroom or Simulator Actual Testing Environment:
                          &#xa2; Perform                           SRO Only:       &#xa2; Yes       &#xa3; No Time Critical:       &#xa3; Yes           &#xa2; No Estimated Time to Complete:           15 minutes                 Actual Time Used:             minutes
&#xa3; Simulator &#xa3; Plant &#xa3; Control Room Testing Method:
&#xa3; Simulate Alternate Path:
&#xa3; Yes &#xa2; No   &#xa2; Perform SRO Only: &#xa2; Yes &#xa3; No Time Critical:
&#xa3; Yes &#xa2; No Estimated Time to Complete:
1 5 minutes Actual Time Used:
minutes  


==References:==
==References:==
* CY-CL-170-301 Clinton Power Station Unit 1 Offsite Dose Calculation Manual (ODCM) Rev. 2 5
* CY-CL-170-301 Clinton Power Station Unit 1 Offsite Dose Calculation Manual (ODCM)
* CPS 9038.70 Radiation Monitoring Source Check Surveillance Rev. 3 e EVALUATION  
Rev. 25
* CPS 9038.70 Radiation Monitoring Source Check Surveillance Rev. 3e EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                 &#xa3; Yes       &#xa3; No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             &#xa3; Satisfactory             &#xa3; Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                              (Print)
&#xa3; Yes &#xa3; No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Signature:                                                              Date:
&#xa3; Satisfactory
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            Page 11 of 12
&#xa3; Unsatisfactory Comments:


Evaluator's Name:
(Print)
Evaluator's Signature:
Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 12 of 12  INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is operating a t 97% power. NO LCOs are in effect.
The plant is operating at 97% power.
1RIX-PR041 Off Gas Post
NO LCOs are in effect.
-Treatment Monitor is currently NON-FUNCTIONAL for maintenance.
1RIX-PR041 Off Gas Post-Treatment Monitor is currently NON-FUNCTIONAL for maintenance.
The OG Vault Refrigeration (VO) System has been shut down for repairs. The repairs have just been completed, and the VO system is being prepared for startup. The OG Charcoal Beds are in BYPASS to support VO system startup IAW CPS 3407.01 Off
The OG Vault Refrigeration (VO) System has been shut down for repairs. The repairs have just been completed, and the VO system is being prepared for startup. The OG Charcoal Beds are in BYPASS to support VO system startup IAW CPS 3407.01 Off-Gas Vault Refrigeration (VO) step 4.1.
-Gas Vault Refrigeration (VO) step 4.1.
CPS 9038.70 Radiation Monitoring Source Check Surveillance has just been completed for the gaseous radiation monitors, OG Pre-treatment process radiation monitor, and the OG Post-Treatment process radiation monitors.
CPS 9038.70 Radiation Monitoring Source Check Surveillance has just been completed for the gaseous radiation monitors, OG Pre
-treatment process radiation monitor, and the OG Post
-Treatment process radiation monitors.
INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.
CAUTION
              &sect;   All pre-job briefings are completed.
As an on-shift SRO, perform the supervisory review of CPS 9038.70 Radiation Monitoring Source Check Surveillance.
As an on-shift SRO, perform the supervisory review of CPS 9038.70 Radiation Monitoring Source Check Surveillance.
Page 12 of 12


JPM482_R0 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure Determine Protective Action Recommendation s JPM Number: JPM482 Revision Number: 0 0 Date: 08/24/16 Developed By:
CLINTON POWER STATION Job Performance Measure Determine Protective Action Recommendations JPM Number: JPM482 Revision Number: 00 Date: 08/24/16 Developed By:         T. Jennings                       8/24/16 Instructor                       Date Validated By:         Matt Baker                       10/26/16 SME or Instructor                 Date Reviewed By:         Jim Lucas                         11/15/16 Operations Representative         Date Approved By:         T. Jennings                       11/15/16 Training Department               Date JPM482_R0 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111
T. Jennings 8/24/16   Instructor Date Validated By:
 
Matt Baker 10/26/16   SME or Instructor Date Reviewed By:
JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)
Jim Lucas 11/15/16   Operations Representative Date Approved By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
T. Jennings 11/15/16   Training Department Date JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM) Page 2 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
(*).
Procedure EP-AA-111 Rev: 19 Procedure EP-AA-1003 Addendum 3 Rev: 1 Procedure EP-AA-111-F-07 Rev: G Procedure EP-AA-112-100-F-01 Rev: V ________ 9. Verify cues both verbal and visual are free of conflict.
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 10. Verify performance time is accurate
Procedure EP-AA-111                 Rev: 19 Procedure EP-AA-1003 Addendum 3 Rev: 1 Procedure EP-AA-111-F-07           Rev: G Procedure EP-AA-112-100-F-01 Rev: V
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________     9. Verify cues both verbal and visual are free of conflict.
________     10. Verify performance time is accurate
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date Page 2 of 11


SME / Instructor Date SME / Instructor Date SME / Instructor Date JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM) Page 3 of 11 Revision Record (Summary)
JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)
Revision Date Description 00 8/24/16 New JPM JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM) Page 4 of 11 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
Revision Record (Summary)
TASK STANDARDS
Revision Date                           Description 00     8/24/16 New JPM Page 3 of 11
:
 
JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
* Examinee classifies the event, and determines appropriate PARs (evacuate Sub Area 1) within the required time frame.
* Examinee classifies the event, and determines appropriate PARs (evacuate Sub Area 1) within the required time frame.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
Line 1,271: Line 1,242:


==REFERENCES:==
==REFERENCES:==
* EP-AA-111, Emergency Classification and Protective Action Recommendations, Rev 1 9
* EP-AA-111, Emergency Classification and Protective Action Recommendations, Rev 19
* EP-AA-1003 Addendum 3 , Emergency Action Levels For Clinton Station, Rev 1
* EP-AA-1003 Addendum 3, Emergency Action Levels For Clinton Station, Rev 1
* EP-AA-111-F-07, Clinton PAR Flowchart, Rev G
* EP-AA-111-F-07, Clinton PAR Flowchart, Rev G
* EP-AA-112-100-F-01 Shift Emergency Director Checklist, Rev.
* EP-AA-112-100-F-01 Shift Emergency Director Checklist, Rev. V EVALUATOR INSTRUCTIONS:
V EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
* All pre-job briefings are completed.
* Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
* Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
* Provide the examinee with the following items when requested:
* Provide the examinee with the following items when requested:
o Shift Emergency Director Binder o EP-AA-1003, Addendum 3 EALs o EP-AA-1003, Addendum 3 Bases
o Shift Emergency Director Binder o EP-AA-1003, Addendum 3 EALs o EP-AA-1003, Addendum 3 Bases Page 4 of 11


JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM) Page 5 of 11  INITIAL CONDITIONS:
JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS:
You are the Shift Manager.
You are the Shift Manager.
The plant was operating at rated thermal power when a transient occurred.
The plant was operating at rated thermal power when a transient occurred.
Plant conditions are as follows:
Plant conditions are as follows:
* Reactor Water level is  
* Reactor Water level is -177 inches and lowering with no injection sources available.
-177 inches and lowering with no injection sources available.
* Radiation levels in the containment are 37 R/hr.
* Radiation levels in the containment are 37 R/hr.
* Hydrogen concentration in the drywell is 9.2%.
* Hydrogen concentration in the drywell is 9.2%.
* No release is in progress
* No release is in progress.
. INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.
CAUTION
&sect; No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
              &sect; All pre-job briefings are completed.
&sect; Do NOT shine any type light into a panel.
              &sect; No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
This JPM is time critical. You are to determine if any Emergency Action Levels have been exceeded.
              &sect; Do NOT shine any type light into a panel.
This JPM is time critical.
You are to determine if any Emergency Action Levels have been exceeded.
Evaluator: Log START TIME as soon as the Initiating Cue is read and acknowledged by the examinee.
Evaluator: Log START TIME as soon as the Initiating Cue is read and acknowledged by the examinee.
START TIME:
START TIME:
Page 5 of 11


JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM) Page 6 of 11 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS EP-AA-1003 Radiological Emergency Plan Annex For Clinton Station
PERFORMANCE STEPS EP-AA-1003 Radiological Emergency Plan Annex For Clinton Station
*JPM Step 1 Examinee determines that a Site Area Emergency EAL has been exceeded due to FS1 Loss or Potential Loss of ANY two barriers.
  *JPM Step 1       Examinee determines that a Site Area Emergency EAL has been exceeded due to FS1 Loss or Potential Loss of ANY two barriers.
Standard: Examinee reviews EP
Standard:           Examinee reviews EP-AA-1003 Hot Matrix and determines that FS1 threshold has been exceeded due to:
-A A-1003 Hot Matrix and determines that FS1 threshold has been exceeded due to:
* Potential Loss of Fuel Clad because RPV level cannot be restored and maintained > -162 inches (TAF).
* Potential Loss of Fuel Clad because RPV level cannot be restored and maintained >  
* Loss of Reactor Coolant System because Containment Radiation Monitor is reading > 33 R/hr and RPV level cannot be restored and maintained > -
-162 inches (TAF).
162 inches (TAF).
* Loss of Reactor Coolant System because Containment Radiation Monitor is reading > 33 R/hr and RPV level cannot be restored and maintained >  
* Potential Loss of Containment because Drywell hydrogen concentration 9%
-162 inches (TAF)
Cue:               Acknowledge report from the examinee.
.
Comments           Evaluator Note: A 15-minute clock to declare the EAL starts as soon as the initiating cue is read and acknowledged via 3-part communication by the examinee. Record the time of the declaration below. The time declared must be no more than 15 minutes from the START TIME.
* Potential Loss of Containment because 9%   Cue: Acknowledge report from the examinee.
Record Time EAL Declared ___________
Comments Evaluator Note: A 15
-minute clock to declare the EAL starts as soon as the initiating cue is read and acknowledged via 3
-part communication by the examinee. Record the time of the declaration below. The time declared must be no more than 15 minutes from the START TIME.
Record Time EAL Declared ___
________
Record Start Time (from Page 5) ___________
Record Start Time (from Page 5) ___________
NOT longer than 15 minutes between the time EAL Declared and Start Time:
NOT longer than 15 minutes between the time EAL Declared and Start Time:
YES / NO Page 6 of 11


YES / NO JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM) Page 7 of 11  SAT   &#xa3; UNSAT   &#xa3; Comment Number JPM Step 2 Evaluator provides an additional cue.
JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)
Standard: Examinee acknowledges the additional information provided by the evaluator.
SAT &#xa3;               UNSAT &#xa3;               Comment Number JPM Step 2 Evaluator provides an additional cue.
Cue: After the EAL call has been made, cue the examinee as follows:
Standard:       Examinee acknowledges the additional information provided by the evaluator.
Cue:           After the EAL call has been made, cue the examinee as follows:
* Hydrogen concentration in the Drywell is now 10.2%.
* Hydrogen concentration in the Drywell is now 10.2%.
* Radiation level in the containment is now 103 R/hr.
* Radiation level in the containment is now 103 R/hr.
* No release is in progress
* No release is in progress.
. Determine if any Emergency Action Levels have been exceeded
Determine if any Emergency Action Levels have been exceeded.
. Comments Evaluator Note: A 15
Comments       Evaluator Note: A 15-minute clock to declare the EAL starts as soon as the initiating cue in JPM step 2 is read and acknowledged via 3-part communication by the examinee.
-minute clock to declare the EAL starts as soon as the initiating cue in JPM step 2 is read and acknowledged via 3
-part communication by the examinee.
Record Start Time ___________
Record Start Time ___________
SAT   &#xa3; UNSAT   &#xa3; Comment Number
SAT &#xa3;               UNSAT &#xa3;               Comment Number Page 7 of 11


JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM) Page 8 of 11  *JPM Step 3 Examinee determines that a General Emergency EAL has been exceeded due to FG1 Loss of ANY two barriers AND Loss o r Potential Loss of third barrier. Standard: Examinee reviews EP
JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)
-AA-1003 Hot Matrix and determines that FG1 threshold has been exceeded due to:
  *JPM Step 3 Examinee determines that a General Emergency EAL has been exceeded due to FG1 Loss of ANY two barriers AND Loss or Potential Loss of third barrier.
Standard:     Examinee reviews EP-AA-1003 Hot Matrix and determines that FG1 threshold has been exceeded due to:
* Loss of Fuel Clad because Containment Radiation Monitor is reading >
* Loss of Fuel Clad because Containment Radiation Monitor is reading >
41.3 R/hr.
41.3 R/hr.
* Loss of Reactor Coolant System because Containment Radiation Monitor is reading > 33 R/hr and RPV level cannot be restored and maintained >  
* Loss of Reactor Coolant System because Containment Radiation Monitor is reading > 33 R/hr and RPV level cannot be restored and maintained > -
-162 inches (TAF).
162 inches (TAF).
* Potential Loss of Containment because Containment Radiation Monitor is reading > 97 R/hr and DW Hydrogen concentration is . Cue: Acknowledge report from the examinee.
* Potential Loss of Containment because Containment Radiation Monitor is reading > 97 R/hr and DW Hydrogen concentration is 9%.
Ask examinee to determine what (if any) Protective Action Recommendations (PARs) are required.
Cue:         Acknowledge report from the examinee. Ask examinee to determine what (if any)
Comments Evaluator Note: A 15
Protective Action Recommendations (PARs) are required.
-minute clock to declare the EAL starts as soon as the initiating cue is read and acknowledged via 3
Comments     Evaluator Note: A 15-minute clock to declare the EAL starts as soon as the initiating cue is read and acknowledged via 3-part communication by the examinee. Record the time of the declaration below. The time declared must be no more than 15 minutes from the START TIME.
-part communication by the examinee. Record the time of the declaration below. The time declared must be no more than 15 minutes from the START TIME.
Record Time EAL Declared ___________
Record Time EAL Declared ___________
Record Start Time (from JPM Step 2) ________
Record Start Time (from JPM Step 2) ___________
___  NOT longer than 15 minutes between the time EAL Declared and Start Time:
NOT longer than 15 minutes between the time EAL Declared and Start Time:
YES / NO SAT   &#xa3; UNSAT   &#xa3; Comment Number
YES / NO SAT &#xa3;               UNSAT &#xa3;             Comment Number Page 8 of 11


JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM) Page 9 of 11  *JPM Step 4 Examinee determine s the protective action recommendation is to Evacuate Sub Area 1 for a 2 mile radius and 10 miles downwind.
JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)
Standard: Examinee reviews EP
  *JPM Step 4     Examinee determines the protective action recommendation is to Evacuate Sub Area 1 for a 2 mile radius and 10 miles downwind.
-AA-111-F-07 Clinton PAR Flowchart and determines that a Rapidly Progressing Severe Accident is not in progress (primary containment has not be lost), requiring evacuation of Sub Area 1.
Standard:         Examinee reviews EP-AA-111-F-07 Clinton PAR Flowchart and determines that a Rapidly Progressing Severe Accident is not in progress (primary containment has not be lost), requiring evacuation of Sub Area 1.
Cue: When requested, cue the examinee that wind direction is 159
Cue:             When requested, cue the examinee that wind direction is 159&deg;.
&deg;. Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number TERMINATING CUES:
Comments SAT &#xa3;               UNSAT &#xa3;               Comment Number TERMINATING CUES:
EAL thresholds evaluated and Protective Action Recommendations determined.
EAL thresholds evaluated and Protective Action Recommendations determined.
STOP TIME:
STOP TIME:
Page 9 of 11


JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 10 of 11 Operator's Name:
Operators Name:
Job Title:
Job
&#xa3; EO &#xa3; RO &#xa3; SRO &#xa3; STA &#xa3; SRO Cert JPM Title:
 
Determine a Protective Action Recommendation JPM Number:
==Title:==
JPM 482 Revision Number:
&#xa3; EO               &#xa3; RO               &#xa3; SRO           &#xa3; STA         &#xa3; SRO Cert JPM
0 0 Task Number and Title:
 
997777.02, Determine a Protective Action Recommendation K/A System K/A Number Importance (RO/SRO)
==Title:==
Generic 2.4.44 2.4 4.4 Knowledge of emergency plan protective action recommendations.
Determine a Protective Action Recommendation JPM Number:     JPM482                                                        Revision Number: 00 Task Number and
Suggested Testing Environment
 
: Simulator Actual Testing Environment:
==Title:==
&#xa3;   Simulator &#xa3; Plant &#xa3; Control Room Testing Method:
997777.02, Determine a Protective Action Recommendation K/A System         K/A Number                     Importance (RO/SRO)
&#xa3; Simulate Alternate Path:
Generic               2.4.44                     2.4                 4.4 Knowledge of emergency plan protective action recommendations.
&#xa3; Yes &#xa2; No   &#xa2; Perform SRO Only: &#xa2; Yes &#xa3; No Time Critical:
Suggested Testing Environment:                 Simulator Actual Testing Environment:               &#xa3; Simulator             &#xa3; Plant         &#xa3; Control Room Testing Method:         &#xa3; Simulate                     Alternate Path:       &#xa3; Yes       &#xa2; No
&#xa2; Yes &#xa3; No Estimated Time to Complete:
                          &#xa2; Perform                           SRO Only:       &#xa2; Yes       &#xa3; No Time Critical:       &#xa2; Yes           &#xa3; No Estimated Time to Complete:           20 minutes                 Actual Time Used:             minutes
20 minutes Actual Time Used:
minutes  


==References:==
==References:==
* EP-AA-111, Emergency Classification and Protective Action Recommendations, Rev. 1 9
* EP-AA-111, Emergency Classification and Protective Action Recommendations, Rev. 19
* EP-AA-1003, Radiological Emergency Plan Annex for Clinton Station, Rev. 2 5
* EP-AA-1003, Radiological Emergency Plan Annex for Clinton Station, Rev. 25
* EP-AA-1003 Addendum 3 Emergency Action Levels For Clinton Station, Rev. 1
* EP-AA-1003 Addendum 3 Emergency Action Levels For Clinton Station, Rev. 1
* EP-AA-111-F-07, Clinton Plant based Par Flowchart, Rev G
* EP-AA-111-F-07, Clinton Plant based Par Flowchart, Rev G
* EP-AA-112-100-F-01 Shift Emergency Director Checklist, Rev.
* EP-AA-112-100-F-01 Shift Emergency Director Checklist, Rev. V EVALUATION  
V EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                 &#xa3; Yes       &#xa3; No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             &#xa3; Satisfactory             &#xa3; Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                              (Print)
&#xa3; Yes &#xa3; No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Signature:                                                              Date:
&#xa3; Satisfactory
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            Page 10 of 11
&#xa3; Unsatisfactory Comments:


Evaluator's Name:
(Print)
Evaluator's Signature:
Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 11 of 11  INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are the Shift Manager.
You are the Shift Manager.
The plant was operating at rated thermal power when a transient occurred.
The plant was operating at rated thermal power when a transient occurred.
Plant conditions are as follows:
Plant conditions are as follows:
* Reactor Water level is  
* Reactor Water level is -177 inches and lowering with no injection sources available.
-177 inches and lowering with no injection sources available.
* Radiation levels in the containment are 37 R/hr.
* Radiation levels in the containment are 37 R/hr.
* Hydrogen concentration in the drywell is 9.2%.
* Hydrogen concentration in the drywell is 9.2%.
* No release is in progress.
* No release is in progress.
INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.
CAUTION
&sect; No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
              &sect; All pre-job briefings are completed.
&sect; Do NOT shine any type light into a panel.
              &sect; No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
              &sect; Do NOT shine any type light into a panel.
This JPM is time critical.
This JPM is time critical.
You are to determine if any Emergency Action Levels have been exceeded.
You are to determine if any Emergency Action Levels have been exceeded.
Page 11 of 11
CLINTON POWER STATION Job Performance Measure Transfer RR Pumps from Fast to Slow Speed JPM Number: JPM448 Revision Number: 02 Date: 9/14/16 Developed By:      Tony Jennings                  9/14/16 Instructor                      Date Validated By:      Brian Glynn                    10/26/16 SME or Instructor              Date Reviewed By:      Jim Lucas                      11/15/16 Operations Representative      Date Approved By:      T. Jennings                    11/15/16 Training Department            Date JPM448_R2 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111


JPM448_R2 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure Transfer RR Pumps from Fast to Slow Speed JPM Number:  JPM44 8 Revision Number: 0 2 Date:  9/14/16 Developed By:
JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Tony Jennings 9/14/16  Instructor Date  Validated By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Brian Glynn 10/26/16  SME or Instructor Date  Reviewed By:
Jim Lucas  11/15/16  Operations Representative Date  Approved By:
T. Jennings 11/15/16  Training Department Date JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 2 of 12 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure CPS 3302.01             Rev: 35f Procedure                         Rev:
Procedure CPS 3302.01 Rev: 35f Procedure Rev: Procedure Rev: ________ 9. Verify cues both verbal and visual are free of conflict.
Procedure                         Rev:
________ 10. Verify performance time is accurate
________     9. Verify cues both verbal and visual are free of conflict.
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     10. Verify performance time is accurate
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
SME / Instructor Date SME / Instructor Date SME / Instructor Date JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Page 3 of 12 Revision Record (Summary)
SME / Instructor                                   Date SME / Instructor                                   Date SME / Instructor                                   Date Page 2 of 12
Revision Date Description 0 0 2/23/11 Modified from JPM 215. Removed alternate path.
 
01 11/27/12 Updated procedure references.
JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
0 2 8/29/16 Updated procedure references.
Revision Record (Summary)
Converted to new template. Made editorial changes throughout. Added new instructions for setting up the IC.
Revision   Date                             Description 00    2/23/11 Modified from JPM 215. Removed alternate path.
01     11/27/12 Updated procedure references.
02    8/29/16 Updated procedure references. Converted to new template.
Made editorial changes throughout. Added new instructions for setting up the IC.
Page 3 of 12


JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 4 of 12 Simulator Setup Instructions
Simulator Setup Instructions
: 1. IC Setup a. Reset the simulator to IC-7 or equivalent with power  33%. b. Lower RR flow (if necessary) until reactor power is ~ 33%.
: 1. IC Setup
: c. Perform CPS 3006.01 Unit Shutdown steps 8.2.1  
: a. Reset the simulator to IC-7 or equivalent with power  33%.
- 8.2.4. d. Ensure plant is stable and then save to a different IC if JPM is being used more than once.
: b. Lower RR flow (if necessary) until reactor power is ~ 33%.
IC-228 (pw: 76319) is saved for the ILT 15
: c. Perform CPS 3006.01 Unit Shutdown steps 8.2.1 - 8.2.4.
-1 NRC Exam.
: d. Ensure plant is stable and then save to a different IC if JPM is being used more than once.
: 2. JPM Setup a. Reset the simulator to the IC saved in 1.d above with power ~ 33%.
IC-228 (pw: 76319) is saved for the ILT 15-1 NRC Exam.
: b. Open and execute Simulator Lesson Plan ILT 15-1 NRC Exam JPMs/JPM 44 8 containing the following: 1) RR_FBYPSA to Bypass on Remote1
: 2. JPM Setup
: 2) RR_FBYPSB to Bypass on Remote2
: a. Reset the simulator to the IC saved in 1.d above with power ~ 33%.
: b. Open and execute Simulator Lesson Plan ILT 15-1 NRC Exam JPMs/JPM448 containing the following:
: 1)   RR_FBYPSA to Bypass on Remote1
: 2)   RR_FBYPSB to Bypass on Remote2
: c. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
: c. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
: d. This completes the setup for this JPM.
: d. This completes the setup for this JPM.
Page 4 of 12


JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 12 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
TASK STANDARDS:
:
* Examinee has successfully performed steps for transferring Reactor Recirculation Pumps to Slow Speed.
* Examinee has successfully performed steps for transferring Reactor Recirculation Pumps to Slow Speed.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
Line 1,458: Line 1,426:


==REFERENCES:==
==REFERENCES:==
* CPS 3302.01, Rev 3 5f Reactor Recirculation (RR)
* CPS 3302.01, Rev 35f Reactor Recirculation (RR)
EVALUATOR INSTRUCTIONS:
EVALUATOR INSTRUCTIONS:
* Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
* Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
* Provide the examinee with a cop y of CPS 3302.01, Reactor Recirculation (RR) and applicable REMA with the cue sheet.
* Provide the examinee with a copy of CPS 3302.01, Reactor Recirculation (RR) and applicable REMA with the cue sheet.
* Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
* All pre-job briefings are completed.
Page 5 of 12


JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 12  INITIAL CONDITIONS:
INITIAL CONDITIONS:
A plant shutdown is in progress with power at approximately 33% of rated thermal power. One TDRFP is in operation with level control on the Master Level Controller (MLC). INITIATING CUE:
A plant shutdown is in progress with power at approximately 33% of rated thermal power. One TDRFP is in operation with level control on the Master Level Controller (MLC).
INITIATING CUE:
As the Reactor Operator you are directed to transfer the Reactor Recirculation Pumps to Slow Speed per CPS 3302.01 Reactor Recirculation (RR) and the REMA.
As the Reactor Operator you are directed to transfer the Reactor Recirculation Pumps to Slow Speed per CPS 3302.01 Reactor Recirculation (RR) and the REMA.
Annunciators associated with Reactor Recirculation Pump transfer are to be considered "Expected Annunciators" and treated as such.
Annunciators associated with Reactor Recirculation Pump transfer are to be considered Expected Annunciators and treated as such.
The Field Operator is available via PCS phone. RP has been notified.
The Field Operator is available via PCS phone. RP has been notified.
The 'B' RO will respond to all back
The B RO will respond to all back-panel annunciators.
-panel annunciators.
START TIME:
START TIME:
Page 6 of 12


JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 7 of 12 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM. CPS 3302.01, REACTOR RECIRCULATION
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
*8.1.3.1 1. Start both LFMG's:
CPS 3302.01, REACTOR RECIRCULATION
        *8.1.3.1   1.     Start both LFMGs:
* Close LFMG A Bkr 1A for RR pump 1A.
* Close LFMG A Bkr 1A for RR pump 1A.
* Close LFMG B Bkr 1B for RR pump 1B Standard: Examinee depresses the "CLOSE" pushbutton for LFMG A Mtr Bkr 1A and LFMG B Mtr Bkr 1B (red light is on and the green light i s off for both breakers)
* Close LFMG B Bkr 1B for RR pump 1B Standard:           Examinee depresses the CLOSE pushbutton for LFMG A Mtr Bkr 1A and LFMG B Mtr Bkr 1B (red light is on and the green light is off for both breakers).
. Cue: As CRS respond to 'A' RO report of start of the LFMGs. If candidate requests condition of LFMG's from the field, report "both LFMG's are operating normally".
Cue:               As CRS respond to A RO report of start of the LFMGs. If candidate requests condition of LFMGs from the field, report both LFMGs are operating normally.
Comments The field cue will be performed by the Simulator Booth Operator (Field Operator) if candidate uses PCS phone to contact the Field Operator.
Comments           The field cue will be performed by the Simulator Booth Operator (Field Operator) if candidate uses PCS phone to contact the Field Operator.
SAT   &#xa3; UNSAT   &#xa3; Comment Number
SAT &#xa3;             UNSAT &#xa3;                 Comment Number Page 7 of 12


JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM) 8.1.3.2 (Local)     At 1B33-P001A and B, LFMG Aux Relay Panel, place following keylock switches to BYPASS:
Page 8 of 12  8.1.3.2 (Local) At 1B33-P001A and B, LFMG Aux Relay Panel, place following keylock switches to BYPASS:
A pump:       &deg; S126A, Power Interlock (Both on FB 781 East)
A pump: &deg; S126A, Power Interlock (Both on FB 781' East)
                              &deg; S127A, Total Feedwater Low Flow Interlock B pump:       &deg; S126B, Power Interlock (Both on FB 781 West)
&deg; S127A, Total Feedwater Low Flow Interlock B pump: &deg; S126B, Power Interlock (Both on FB 781' West)
                              &deg; S127B, Total Feedwater Low Flow Interlock Standard:       Examinee requests area operator to place S126A&B and S127A&B in BYPASS at panels 1B33-P001A and 1B33-P001B.
&deg; S127B, Total Feedwater Low Flow Interlock Standard: Examinee requests area operator to place S126A&B and S127A&B in BYPASS at panels 1B33
Cue:           Insert REMOTE 1 and REMOTE 2 and inform the examinee that S126A&B and S127A&B are in BYPASS.
-P001A and 1B33
Comments       The cue will be performed by the Simulator Booth Operator (Field Operator) if candidate uses PCS phone to contact the Field Operator.
-P001B. Cue: Insert REMOTE 1 and REMOTE 2 and inform the examinee that S126A&B and S127A&B are in BYPASS.
SAT &#xa3;               UNSAT &#xa3;             Comment Number 8.1.3.3 Make the following RR pump transfer notifications:
Comments The cue will be performed by the Simulator Booth Operator (Field Operator) if candidate uses PCS phone to contact the Field Operator.
SAT   &#xa3; UNSAT   &#xa3; Comment Number 8.1.3.3 Make the following RR pump transfer notifications:
: 1) Notify RP of potential change in Rad levels.
: 1) Notify RP of potential change in Rad levels.
: 2) Make a plant wide Gaitronics announcement that the RR pumps will be transferred to slow.
: 2) Make a plant wide Gaitronics announcement that the RR pumps will be transferred to slow.
Standard: Simulates calling RP to notify them of potential rad level changes
Standard:       Simulates calling RP to notify them of potential rad level changes.
. Simulates making Gaitronics announcement, "Transferring RR Pumps to Slow Speed". Cue: Respond as RP acknowledging notification of changing rad levels.
Simulates making Gaitronics announcement, Transferring RR Pumps to Slow Speed.
Comments Part of initiating cue. Candidate should recognize condition met. Only respond if needed. SAT   &#xa3; UNSAT   &#xa3; Comment Number
Cue:           Respond as RP acknowledging notification of changing rad levels.
Comments       Part of initiating cue. Candidate should recognize condition met. Only respond if needed.
SAT &#xa3;               UNSAT &#xa3;             Comment Number Page 8 of 12


JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 9 of 12 *8.1.3.4 Place both 1B33
      *8.1.3.4 Place both 1B33-F060A & B, Recirc FCVs at ~ 10%, but not > 10% position.
-F060A & B, Recirc FCVs at  
Standard:       Examinee positions both FCV slide levers (one at a time) to the left until both 1B33-F060A & B, Recirc FCVs are at ~ 10% (but not > 10%) position.
~ 10%, but not > 10% position.
Cue:
Standard: Examinee positions both FCV slide levers (one at a time) to the left until both 1B33-F060A & B, Recirc FCVs are at ~ 10% (but not > 10%) position
Comments       Alarms 5006-3D OPRM Enabled, 5004-3D & 5005-3D TCV/TSV Trip Bypassed, and 5006-3H Low Power Alarm Point are expected alarms.
. Cue: Comments Alarms 5006-3D OPRM Enabled , 5004-3D & 5005-3D TCV/TSV Trip Bypassed , and 5006-3H Low Power Alarm Point are expected alarms.
SAT &#xa3;           UNSAT &#xa3;               Comment Number
SAT   &#xa3; UNSAT   &#xa3; Comment Number
      *8.1.3.5 Transfer the RR pumps to the LFMG by depressing both TRANSFER TO LFMG A and B push-buttons simultaneously.
    *8.1.3.5 Transfer the RR pumps to the LFMG by depressin g both TRANSFER TO LFMG A and B push
Standard:       Examinee simultaneously depresses both RECIRC PUMP A & B DRIVE MOTOR BKR 5A & 5B TRANS TO LFMG A and B push-buttons.
-buttons simultaneously.
Cue:           As CRS respond to A RO report of RR Pump transfer to slow speed.
Standard: Examinee simultaneously depresses both RECIRC PUMP A & B DRIVE MOTOR BKR 5A & 5B TRANS TO LFMG A and B push
Comments SAT &#xa3;           UNSAT &#xa3;               Comment Number Page 9 of 12
-buttons. Cue: As CRS respond to 'A' RO report of RR Pump transfer to slow speed. Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number


JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM) 8.1.3.6 Observe that the 5A and 5B breakers open and when pump speed decreases, the 2A and 2B breakers close.
Page 10 of 12  8.1.3.6 Observe that the 5A and 5B breakers open and when pump speed decreases, the 2A and 2B breakers close.
Standard:       Examinee observes that the 5A and 5B breakers open (red light off, green light on) and when pump speed decreases the 2A and 2B breakers close (red light on, green light off).
Standard: Examinee observes that the 5A and 5B breakers open (red light off, green light on) and when pump speed decreases the 2A and 2B breakers close (red light on, green light off).
Cue:           State that the JPM is complete Comments SAT &#xa3;               UNSAT &#xa3;             Comment Number TERMINATING CUES:
Cue: State that the JPM is complete Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number TERMINATING CUES:
RR Pumps A and B have been shifted to slow speed.
RR Pumps A and B have been shifted to slow speed.
STOP TIME:
STOP TIME:
Page 10 of 12
 
JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
 
==Title:==
&#xa3; NLO              &#xa3; RO                &#xa3; SRO            &#xa3; STA          &#xa3; SRO Cert JPM
 
==Title:==
Transfer RR Pumps from Fast to Slow Speed JPM Number:      JPM448                                                        Revision Number: 02 Task Number and


JPM448 - Rev 02  Clinton Power Station Job Performance Measure (JPM)
==Title:==
SRRS: 3D.105 (when utilized for operator initial or continuing training)
330201.24 RR Pump Transfer To Slow Speed K/A System         K/A Number                     Importance (RO/SRO) 202001               A4.01                     3.7                 3.7 Ability to manually operate and/or monitor in the control room:
Page 11 of 12 Operator's Name:    Job Title:
Recirculation pumps.
&#xa3;  NLO &#xa3;  RO &#xa3;  SRO &#xa3;  STA &#xa3;  SRO Cert JPM Title:
Suggested Testing Environment:                 Simulator Actual Testing Environment:               &#xa2; Simulator             &#xa3; Plant         &#xa3; Control Room Testing Method:         &#xa3; Simulate                     Alternate Path:       &#xa3; Yes       &#xa2; No
Transfer RR Pumps from Fast to Slow Speed JPM Number:
                          &#xa2; Perform                           SRO Only:       &#xa3; Yes       &#xa2; No Time Critical:       &#xa3; Yes           &#xa2; No Estimated Time to Complete: 20 minutes                             Actual Time Used:             minutes
JPM 44 8 Revision Number:
 
0 2 Task Number and Title:
==References:==
330201.24 RR Pump Transfer To Slow Speed K/A System K/A Number Importance (RO/SR O) 202001 A4.01 3.7 3.7 Ability to manually operate and/or monitor in the control room: Recirculation pump s. Suggested Testing Environment:
Simulator Actual Testing Environment:
&#xa2; Simulator &#xa3; Plant &#xa3; Control Room Testing Method:
&#xa3; Simulate Alternate Path: &#xa3; Yes &#xa2; No   &#xa2; Perform SRO Only: &#xa3; Yes &#xa2; No Time Critical:
&#xa3; Yes &#xa2; No Estimated Time to Complete:
20 minutes Actual Time Used:
minutes References
:
* CPS No. 3302.01, Rev 35f REACTOR RECIRCULATION (RR)
* CPS No. 3302.01, Rev 35f REACTOR RECIRCULATION (RR)
EVALUATION  
EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                 &#xa3; Yes       &#xa3; No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             &#xa3; Satisfactory             &#xa3; Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                              (Print)
&#xa3; Yes &#xa3; No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Signature:                                                              Date:
&#xa3; Satisfactory
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            Page 11 of 12
&#xa3; Unsatisfactory Comments:


Evaluator's Name:
(Print)
Evaluator's Signature:
Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 12 of 12  INITIAL CONDITIONS:
INITIAL CONDITIONS:
A plant shutdown is in progress with power at approximately 33% of rated thermal power. One TDRFP is in operation with level control on the Master Level Controller (MLC)
A plant shutdown is in progress with power at approximately 33% of rated thermal power. One TDRFP is in operation with level control on the Master Level Controller (MLC).
. INITIATING CUE:
INITIATING CUE:
As the Reactor Operator you are directed to transfer the Reactor Recirculation Pumps to Slow Speed per CPS 3302.01 Reactor Recirculation (RR) and the REMA.
As the Reactor Operator you are directed to transfer the Reactor Recirculation Pumps to Slow Speed per CPS 3302.01 Reactor Recirculation (RR) and the REMA.
Annunciators associated with Reactor Recirculation Pump transfer are to be considered "Expected Annunciators" and treated as such.
Annunciators associated with Reactor Recirculation Pump transfer are to be considered Expected Annunciators and treated as such.
The Field Operator is available via PCS phone. RP has been notified.
The Field Operator is available via PCS phone. RP has been notified.
The 'B' RO will respond to all back
The B RO will respond to all back-panel annunciators.
-panel annunciators.
Page 12 of 12
 
CLINTON POWER STATION Job Performance Measure Turbine Driven Reactor Feed Pump (TDRFP) B Startup (Alternate Path)
JPM Number: JPM530 Revision Number: 01 Date: 9/16/16 Developed By:          T. Jennings                      9/16/16 Instructor                        Date Validated By:          Michael Antonelli                10/25/16 SME or Instructor                Date Reviewed By:          Jim Lucas                        11/15/16 Operations Representative        Date Approved By:          T. Jennings                      11/15/16 Training Department              Date JPM530_1 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111


JPM530_1 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure Turbine Driven Reactor Feed Pump (TDRFP) 'B' Startup (Alternate Path)
JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number:  JPM530 Revision Number: 0 1 Date: 9/16/16  Developed By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
T. Jennings 9/16/16  Instructor Date  Validated By:
Michael Antonelli 10/25/16  SME or Instructor Date  Reviewed By:
Jim Lucas  11/15/16  Operations Representative Date  Approved By:
T. Jennings 11/15/16  Training Department Date JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 2 of 13 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
(*).
Procedure CPS 3 103.01 Rev: 31 Procedure CPS 5002.02 Rev: 29 e  Procedure CPS 5002.03 Rev: 28 b  ________ 9. Verify cues both verbal and visual are free of conflict.
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 10. Verify performance time is accurate
Procedure CPS 3103.01               Rev: 31 Procedure CPS 5002.02               Rev: 29e Procedure CPS 5002.03               Rev: 28b
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________     9. Verify cues both verbal and visual are free of conflict.
________     10. Verify performance time is accurate
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date Page 2 of 13


SME / Instructor Date SME / Instructor Date SME / Instructor Date JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 13 Revision Record (Summary)
Revision Record (Summary)
Revision Date Description 00 7/25/14 New JPM. 01 9/16/16 Updated procedure references.
Revision Date                           Description 00     7/25/14 New JPM.
01     9/16/16 Updated procedure references.
Page 3 of 13


JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 4 of 13 Simulator Setup Instructions
Simulator Setup Instructions
: 1. IC Setup a. Initialize to any suitable IC (comparable with IC
: 1. IC Setup
-26) with TDRFP 'A' on the MLC in auto and the TDRFP 'B' in rolling standby.
: a. Initialize to any suitable IC (comparable with IC-26) with TDRFP A on the MLC in auto and the TDRFP B in rolling standby.
: b. Save to a different IC if JPM is being used more than once.
: b. Save to a different IC if JPM is being used more than once. IC-225 is saved for the ILT 15-1 NRC Exam (password 76319).
IC-225 is saved for the ILT 15
: 2. JPM Setup
-1 NRC Exam (password 76319).
: a. Reset the simulator to the IC saved in step 1 above.
: 2. JPM Setup a. Reset the simulator to the IC saved in step 1 above.
: b. Open and execute Simulator Lesson Plan ILT 15-1 NRC Exam JPMs.
: b. Open and execute Simulator Lesson Plan ILT 15-1 NRC Exam JPMs. c. Release JPM 530 which will perform the following:
: c. Release JPM530 which will perform the following:
* Disable TDRFP 'B' trips from 1H13
* Disable TDRFP B trips from 1H13-P680.
-P680.
* Insert vibration alarms and indications when TDRFP B speed is increased above 2800 rpm.
* Insert vibration alarms and indications when TDRFP 'B' speed is increased above 2800 rpm.
* Insert seat leakage into the HPSV & HPCV (9% & 2% respectively)
* Insert seat leakage into the HPSV & HPCV (9% & 2% respectively)
: a. MS0ASLVALVE41 9%
: a. MS0ASLVALVE41 9%
Line 1,599: Line 1,569:
: 4. This completes the setup for this JPM.
: 4. This completes the setup for this JPM.
: 5. Freeze Simulator.
: 5. Freeze Simulator.
Page 4 of 13


JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 13 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
TASK STANDARDS:
:
* Mitigating actions have been taken for high vibrations on the B TDRFP and the RFP has been secured.
* Mitigating actions have been taken for high vibrations on the 'B' TDRFP and the RFP has been secured.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* None PROCEDURAL/
* None PROCEDURAL/
Line 1,610: Line 1,580:
==REFERENCES:==
==REFERENCES:==
* CPS No. 3103.01, Rev 31 Feedwater (FW)
* CPS No. 3103.01, Rev 31 Feedwater (FW)
* CPS No. 5002.02, Rev 29 e Alarm Panel 5002 Annunciators  
* CPS No. 5002.02, Rev 29e Alarm Panel 5002 Annunciators - Row 2
- Row 2
* CPS No. 5002.03, Rev 28b Alarm Panel 5002 Annunciators - Row 3 EVALUATOR INSTRUCTIONS:
* CPS No. 5 002.03, Rev 28 b Alarm Panel 5002 Annunciators  
- Row 3 EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
* All pre-job briefings are completed.
* Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
* Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
* Provide the examinee with a marked up copy of CPS 3103.01 Feedwater (FW) with section 8.1.4.2 TDRFP NORMAL Startup to Rolling STANDBY marked complete.
* Provide the examinee with a marked up copy of CPS 3103.01 Feedwater (FW) with section 8.1.4.2 TDRFP NORMAL Startup to Rolling STANDBY marked complete.
Page 5 of 13


JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 13  INITIAL CONDITIONS:
INITIAL CONDITIONS:
A reactor startup / power ascension is in progress.
A reactor startup / power ascension is in progress.
Reactor power is ~
Reactor power is ~ 50%.
50%. Turbine Driven Reactor Feed Pump (TDRFP) 'A' is operating on the Master Level Controller (MLC) in auto feeding the RPV.
Turbine Driven Reactor Feed Pump (TDRFP) A is operating on the Master Level Controller (MLC) in auto feeding the RPV.
TDRFP 'B' is in rolling standby IAW CPS 3103.01 Feedwater (FW) section 8.1.4.2 TDRFP NORMAL Startup to Rolling STANDBY
TDRFP B is in rolling standby IAW CPS 3103.01 Feedwater (FW) section 8.1.4.2 TDRFP NORMAL Startup to Rolling STANDBY.
. 5 Condensate Polishers (A  
5 Condensate Polishers (A - E) are in service.
- E) are in service.
INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.
CAUTION
The CRS has directed you to place TDRFP 'B' in service feeding the RPV using the 'AUTO' method IAW CPS 3103.01 Feedwater (FW) section 8.1.4.4.
                &sect;   All pre-job briefings are completed.
Transfer rolling STANDBY TDRFP to feeding RPV through 1FW002 A (B). Permission has been granted to perform all critical steps required to perform the task.
The CRS has directed you to place TDRFP B in service feeding the RPV using the AUTO method IAW CPS 3103.01 Feedwater (FW) section 8.1.4.4. Transfer rolling STANDBY TDRFP to feeding RPV through 1FW002A (B).
Report to the CRS after completing the task
Permission has been granted to perform all critical steps required to perform the task.
. START TIME:
Report to the CRS after completing the task.
START TIME:
Page 6 of 13


JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 7 of 13 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 3103.01 Feedwater (FW) section 8.1.4.4 Transfer rolling STANDBY TDRFP to feeding RPV through 1FW002A (B)
PERFORMANCE STEPS CPS 3103.01 Feedwater (FW) section 8.1.4.4 Transfer rolling STANDBY TDRFP to feeding RPV through 1FW002A (B)
STEP ELEMENT STANDARD SAT UNSAT Comment Number *8.1.4.4 Transfer rolling STANDBY TDRFP B to feeding RPV through 1FW002B. 8.1.4.4.1 Examinee determines TDRFP 'B' is in rolling standby per the initiating cue.
Comment SAT      UNSAT STEP               ELEMENT                                 STANDARD Number
*8.1.4.4   Transfer rolling STANDBY TDRFP   8.1.4.4.1 B to feeding RPV through        Examinee determines TDRFP B is in rolling 1FW002B.                        standby per the initiating cue.
8.1.4.4.2 Examinee determines that 5 Condensate Polishers are adequate to perform the evolution.
8.1.4.4.2 Examinee determines that 5 Condensate Polishers are adequate to perform the evolution.
Cue: 5 Condensate Polishers are in service.
Cue: 5 Condensate Polishers are in service.
8.1.4.4.3 Examinee observes Red 'M' on the Digital Feedwater Display for 1FW010B and the 1FW010B valve icon is red.
8.1.4.4.3 Examinee observes Red M on the Digital Feedwater Display for 1FW010B and the 1FW010B valve icon is red.
8.1.4.4.4 Examinee clicks on:
8.1.4.4.4 Examinee clicks on:
* FPB
* FPB
* TDRFP B (and observes the blue outline on the control box)
* TDRFP B (and observes the blue outline on the control box)
* to ~ 2370 rpm
                                                * (and observes TDRFP B RPM decreasing to ~ 2370 rpm)
)
* Exit
* Exit   *8.1.4.4.5 Examinee clicks on:
                                            *8.1.4.4.5 Examinee clicks on:
* Valve icon for 1FW002B
* Valve icon for 1FW002B
* TDRFP Main Discharge Valve 1FW002B (and observes the blue outline on the control box)
* TDRFP Main Discharge Valve 1FW002B (and observes the blue outline on the control box)
* Open (and then verifies indication changes to 'Intermediate' and then 'Full Open')
* Open (and then verifies indication changes to Intermediate and then Full Open)
* Exit JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)
* Exit Page 7 of 13
Page 8 of 13  STEP ELEMENT STANDARD SAT UNSAT Comment Number *8.1.4.4 (cont.) Transfer rolling STANDBY TDRFP B to feeding RPV through 1FW002B
 
  *8.1.4.4.6 Examinee clicks on:
JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Comment SAT    UNSAT STEP                   ELEMENT                                   STANDARD Number
*8.1.4.4   Transfer rolling STANDBY TDRFP B to     *8.1.4.4.6 feeding RPV through 1FW002B (cont.)                                            Examinee clicks on:
* Valve icon for 1FW010B
* Valve icon for 1FW010B
* 1FW010B Min Flow (and observes the blue outline on the control box)
* 1FW010B Min Flow (and observes the blue outline on the control box)
* Close
* Close
* Exit Note: 1FW010B will not physically close with TDRFP 'B' reset and 1FW002B full open. If the examinee depresses the 1FW010B close pushbutton before 1FW002B is full open, 1FW010B will close. If this happens, the error should be considered a failure of a critical step.
* Exit Note: 1FW010B will not physically close with TDRFP B reset and 1FW002B full open.
NOTE Step 8.1.4.4.7 is N/A. *8.1.4.4 (cont.)  *8.1.4.4.8 Examinee observes that TDRFP 'B' indicates 'FPB Speed Setter'.
If the examinee depresses the 1FW010B close pushbutton before 1FW002B is full open, 1FW010B will close. If this happens, the error should be considered a failure of a critical step.
NOTE Step 8.1.4.4.7 is N/A.
*8.1.4.4                                           *8.1.4.4.8 (cont.)                                            Examinee observes that TDRFP B indicates FPB Speed Setter.
Examinee clicks on:
Examinee clicks on:
* FPB Speed Setter
* FPB Speed Setter
* TDRFP B Speed Setpoint Mode (and observes the blue outline on the control box)
* TDRFP B Speed Setpoint Mode (and observes the blue outline on the control box)
* Bring Pump On
* Bring Pump On-Line (and then verifies TDRFP B speed increasing)
-Line (and then verifies TDRFP 'B' speed increasing)
* Exit Page 8 of 13
* Exit JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)
 
Page 9 of 13  ALTERNATE PATH BEGINS Annunciator 5002
JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)
-2F High Vibr RFP 1B Shaft will be received when TDRFP 'B' speed increases above 2800 rpm.
ALTERNATE PATH BEGINS Annunciator 5002-2F High Vibr RFP 1B Shaft will be received when TDRFP B speed increases above 2800 rpm.
Annunciator 5002
Annunciator 5002-3F High Vibr RFPT 1B Shaft will be received 30 seconds later.
-3F High Vibr RFPT 1B Shaft will be received 30 seconds later.
Comment SAT    UNSAT STEP                   ELEMENT                                   STANDARD Number 8.1.4.4.8   Reduce Turbine Speed to clear vibration   8.1.4.4.8.c alarms (fails)                            Examinee clicks on:
STEP ELEMENT STANDARD SAT UNSAT Comment Number 8.1.4.4.8 5002-2F 5002-3F Reduce Turbine Speed to clear vibration alarms (fails) 8.1.4.4.8.c Examinee clicks on:
5002-2F
* FPB Speed Setter
* FPB Speed Setter 5002-3F
* TDRFP B Speed Setpoint Mode (and observes the blue outline on the control box)
* TDRFP B Speed Setpoint Mode (and observes the blue outline on the control box)
* Speed Setter Mode
* Speed Setter Mode
* Exit   Examinee clicks on:
* Exit Examinee clicks on:
* FPB (pump icon)
* FPB (pump icon)
* TDRFP B (and observes the blue outline on the control box)
* TDRFP B (and observes the blue outline on the control box)
* RPM (and then observes that TDRFP 'B' speed begins to lower, but stabilizes at ~ 2000 RPM and that annunciators 5002-2F and 3F remain locked in)
* until setpoint (SP) indicates 0 RPM (and then observes that TDRFP B speed begins to lower, but stabilizes at ~ 2000 RPM and that annunciators 5002-2F and 3F remain locked in)
* Exit Cue: If the examinee requests an Equipment Operator to investigate, acknowledge the order and then cue the examinee, "Vibrations can be felt on the floor of TB 800. I'm leaving due to safety concerns."
* Exit Cue: If the examinee requests an Equipment Operator to investigate, acknowledge the order and then cue the examinee, Vibrations can be felt on the floor of TB 800. Im leaving due to safety concerns.
Page 9 of 13


JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 10 of 13  STEP ELEMENT STANDARD SAT UNSAT Comment Number 8.1.10 TDRFP Shutdown 8.1.10.1 Examinee discuss es with the CRS the need to lockout the RR FCVs during the TDRFP S/D.
Comment SAT    UNSAT STEP                 ELEMENT                                     STANDARD Number 8.1.10   TDRFP Shutdown                           8.1.10.1 Examinee discusses with the CRS the need to lockout the RR FCVs during the TDRFP S/D.
Cue: "Do not lockout the RR FCVs".
Cue: Do not lockout the RR FCVs.
Note: If the examinee elects to trip 'B' TDRFP based on the report from the Equipment Operator, th is step is NA. 8.1.10.4 Examinee clicks on:
Note: If the examinee elects to trip B TDRFP based on the report from the Equipment Operator, this step is NA.
8.1.10.4 Examinee clicks on:
* FPB Trip/Reset pushbutton
* FPB Trip/Reset pushbutton
* TDRFP B (and observes the blue outline on the control box)
* TDRFP B (and observes the blue outline on the control box)
* TDRFP B Trip (and then observes that the HP and LP Stop Valves remain full open)
* TDRFP B Trip (and then observes that the HP and LP Stop Valves remain full open)
* Exit (may or may not perform)
* Exit (may or may not perform)
Examinee reports failure of the 'B' TDRFP to trip to the CRS.
Examinee reports failure of the B TDRFP to trip to the CRS.
    *8.3.14 Securing A TDRFP That Will Not Trip From P680 8.3.14.1 On 1H13-P680-5002, the examinee depresses the 'L' pushbutton on the 'B' TDRFP SLIM Controller and verifies the 'L' pushbutton red light illuminates.
*8.3.14     Securing A TDRFP That Will Not Trip   8.3.14.1 From P680                            On 1H13-P680-5002, the examinee depresses the L pushbutton on the B TDRFP SLIM Controller and verifies the L pushbutton red light illuminates.
8.3.14.2 No action required; the SLIM is at 0% output.   *8.3.14.3 Examinee locates control switch for 1B21-F303B on 1H13
8.3.14.2 No action required; the SLIM is at 0%
-P870-5016, rotates the control switch counter clockwise to the close position, and then verifies the green light illuminates and the red light extinguishes.
output.
Examinee verifies TDRFP 'B' RPM lowering, and that the high vibration annunciators clear.
                                                  *8.3.14.3 Examinee locates control switch for 1B21-F303B on 1H13-P870-5016, rotates the control switch counter clockwise to the close position, and then verifies the green light illuminates and the red light extinguishes.
Examinee verifies TDRFP B RPM lowering, and that the high vibration annunciators clear.
Cue: the JPM is complete.
Cue: the JPM is complete.
Page 10 of 13
JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)
TERMINATING CUES:
The B TDRFP is secured IAW CPS No. 3103.01 section 8.3.14 Securing A TDRFP That Will Not Trip From P680.
STOP TIME:
Page 11 of 13
JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
==Title:==
&#xa3; EO              &#xa3; RO                &#xa3; SRO            &#xa3; STA          &#xa3; SRO Cert JPM


JPM Number: JPM530  - rev 01  Clinton Power Station Job Performance Measure (JPM)
==Title:==
Page 11 of 13 TERMINATING CUES:
Turbine Driven Reactor Feed Pump (TDRFP) B Startup (Alternate Path)
The 'B' TDRFP is secured IAW CPS No. 3103.01 section 8.3.14 Securing A TDRFP That Will Not Trip From P680
JPM Number:     JPM530                                                        Revision Number: 00 Task Number and
. STOP TIME:


JPM Number:  JPM530  - rev 01  Clinton Power Station Job Performance Measure (JPM)
==Title:==
SRRS: 3D.105 (when utilized for operator initial or continuing training)
310301.40d TDRFP Normal Startup/Rolling Standby Operation K/A System         K/A Number                     Importance (RO/SRO) 259001               A4.02                      3.9                 3.7 Ability to manually operate and/or monitor in the control room:
Page 12 of 13 Operator's Name:
Manually start/control a RFP/TDRFP Suggested Testing Environment:                 Simulator Actual Testing Environment:               &#xa2; Simulator             &#xa3; Plant         &#xa3; Control Room Testing Method:         &#xa3; Simulate                     Alternate Path:       &#xa2; Yes       &#xa3; No
Job Titl e: &#xa3;  EO &#xa3;  RO &#xa3;  SRO &#xa3;  STA &#xa3;  SRO Cert JPM Title:
                          &#xa2; Perform                           SRO Only:       &#xa3; Yes       &#xa2; No Time Critical:       &#xa3; Yes           &#xa2; No Estimated Time to Complete:           25 minutes                 Actual Time Used:             minutes
Turbine Driven Reactor Feed Pump (TDRFP) 'B' Startup (Alternate Path)
JPM Number:
JPM 530 Revision Number:
0 0 Task Number and Title:
310301.40d TDRFP Normal Startup/Rolling Standby Operation K/A System K/A Number Importance (RO/SRO) 259001 A 4.0 2 3.9 3.7 Ability to manually operate and/or monitor in the control room: Manually start/control a RFP/TDRFP Suggested Testing Environment:
Simulator Actual Testing Environment:
&#xa2;   Simulator &#xa3; Plant &#xa3; Control Room Testing Method:
&#xa3; Simulate Alternate Path:
&#xa2; Yes &#xa3; No   &#xa2; Perform SRO Only: &#xa3; Yes &#xa2; No Time Critical:
&#xa3; Yes &#xa2; No Estimated Time to Complete:
25 minutes Actual Time Used:
minutes  


==References:==
==References:==
CPS No. 3103.01, Rev 31 Feedwater (FW)
CPS No. 3103.01, Rev 31 Feedwater (FW)
CPS 5002.0 2, Rev 29 e Alarm Panel 5002 Annunciators  
CPS 5002.02, Rev 29e Alarm Panel 5002 Annunciators - Row 2 CPS No. 5002.03, Rev 28b Alarm Panel 5002 Annunciators - Row 3 EVALUATION  
- Row 2 CPS No. 5002.03, Rev 28 b Alarm Panel 5002 Annunciators  
- Row 3 EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                 &#xa3; Yes       &#xa3; No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             &#xa3; Satisfactory             &#xa3; Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                             (Print)
&#xa3; Yes &#xa3; No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Signature:                                                              Date:
&#xa3; Satisfactory
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            Page 12 of 13
&#xa3; Unsatisfactory Comments:
 
Evaluator's Name:
(Print)
Evaluator's Signature:
Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 13 of 13  INITIAL CONDITIONS:
INITIAL CONDITIONS:
A reactor startup / power ascension is in progres
A reactor startup / power ascension is in progress.
: s. Reactor power is ~
Reactor power is ~ 50%.
50%. Turbine Driven Reactor Feed Pump (TDRFP) 'A' is operating on the Master Level Controller (MLC) in auto feeding the RPV.
Turbine Driven Reactor Feed Pump (TDRFP) A is operating on the Master Level Controller (MLC) in auto feeding the RPV.
TDRFP 'B' is in rolling standby IAW CPS 3103.01 Feedwater (FW) section 8.1.4.2 TDRFP NORMAL Startup to Rolling STANDBY. 5 Condensate Polishers (A  
TDRFP B is in rolling standby IAW CPS 3103.01 Feedwater (FW) section 8.1.4.2 TDRFP NORMAL Startup to Rolling STANDBY.
- E) are in service.
5 Condensate Polishers (A - E) are in service.
INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.
CAUTION
The CRS has directed you to place TDRFP 'B' in service feeding the RPV using the 'AUTO' method IAW CPS 3103.01 Feedwater (FW) section 8.1.4.4. Transfer rolling STANDBY TDRFP to feeding RPV through 1FW002 A (B). Permission has been granted to perform all critical steps required to perform the task.
                &sect;   All pre-job briefings are completed.
The CRS has directed you to place TDRFP B in service feeding the RPV using the AUTO method IAW CPS 3103.01 Feedwater (FW) section 8.1.4.4. Transfer rolling STANDBY TDRFP to feeding RPV through 1FW002A (B).
Permission has been granted to perform all critical steps required to perform the task.
Report to the CRS after completing the task.
Report to the CRS after completing the task.
Page 13 of 13
CLINTON POWER STATION Job Performance Measure Steam Bypass Valve Tests JPM Number: JPM419 Revision Number: 00 Date: 2/18/15 Developed By:          T. Jennings                      2/18/15 Instructor                        Date Validated By:          Matt Baker                        10/25/16 SME or Instructor                Date Reviewed By:          Jim Lucas                        11/15/16 Operations Representative        Date Approved By:          T. Jennings                      11/15/16 Training Department              Date JPM419_0 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111


JPM419_0 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure Steam Bypass Valve Tests JPM Number:  JPM419 Revision Number: 0 0 Date: 2/18/15  Developed By:
JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)
T. Jennings 2/1 8/15  Instructor Date  Validated By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Matt Baker 10/25/16  SME or Instructor Date  Reviewed By:
Jim Lucas  11/15/16  Operations Representative Date  Approved By:
T. Jennings 11/15/16  Training Department Date JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 2 of 12 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
(*).
Procedure CPS 9072.01 Rev: 32e Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 10. Verify performance time is accurate
Procedure CPS 9072.01               Rev: 32e Procedure                           Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Procedure                           Rev:
________     9. Verify cues both verbal and visual are free of conflict.
________     10. Verify performance time is accurate
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date Page 2 of 12
 
JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Revision Record (Summary)
Revision  Date                            Description 00    2/18/15 New JPM.
Page 3 of 12


SME / Instructor Date SME / Instructor Date SME / Instructor Date JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 12 Revision Record (Summary)
Simulator Setup Instructions
Revision Date Description 00 2/18/15 New JPM.
: 1. Reset the simulator to an IC with the Main Turbine On-line.
JPM Number:  JPM419  - rev 00  Clinton Power Station Job Performance Measure (JPM)
: 2. No Simulator Lesson Plan is required for this JPM.
Page 4 of 12 Simulator Setup Instructions
: 1. Reset the simulator to an IC with the Main Turbine On
-line. 2. No Simulator Lesson Plan is required for this JPM.
: 3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
: 3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
: 4. This completes the setup for this JPM.
: 4. This completes the setup for this JPM.
: 5. Save to a different IC if JPM is being used more than once. IC
: 5. Save to a different IC if JPM is being used more than once. IC-225 is saved for the ILT 15-1 NRC Exam (password 76319).
-2 25 is saved for the ILT 1 5-1 NRC Exam (password 76319). 6. Freeze Simulator.
: 6. Freeze Simulator.
: 7. Station a training instructor to monitor Main Turbine Bypass Valve Positions at 1H13
: 7. Station a training instructor to monitor Main Turbine Bypass Valve Positions at 1H13-P678 and to initial IV blanks in 9072.01 Table 2: BPV Test Data when requested.
-P678 and to initial IV blanks in 9072.01 Table 2: BPV Test Data when requested.
Page 4 of 12


JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 12 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
TASK STANDARDS:
:
* The Steam Bypass Valve Tests are complete IAW CPS 9072.01 Steam Bypass Valve Tests.
* The Steam Bypass Valve Tests are complete IAW CPS 9072.01 Steam Bypass Valve Tests.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
Line 1,786: Line 1,765:


==REFERENCES:==
==REFERENCES:==
* CPS No. 90 72.0 1, Rev 3 2e Steam Bypass Valve Tests EVALUATOR INSTRUCTIONS:
* CPS No. 9072.01, Rev 32e Steam Bypass Valve Tests EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
* All pre-job briefings are completed.
* This JPM contains cues provided to the examinee from the instructor stationed at 1H13
* This JPM contains cues provided to the examinee from the instructor stationed at 1H13-P678.
-P678. Review these cues with the instructor to ensure the communications between the instructor and examinee are clear and coordinated
Review these cues with the instructor to ensure the communications between the instructor and examinee are clear and coordinated.
.
Page 5 of 12
JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)
 
Page 6 of 12  INITIAL CONDITIONS:
JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)
The reactor is in Mode 1 at ~ 50% power. INITIATING CUE:
INITIAL CONDITIONS:
CAUTION &sect; All pre-job briefings are completed. You are an extra RO. The CRS has directed you to perform CPS 90 72.01 Steam Bypass Valve Tests
The reactor is in Mode 1 at ~ 50% power.
. CPS 9072.01 Section 5.0 Prerequisites are complete.
INITIATING CUE:
CAUTION
                &sect; All pre-job briefings are completed.
You are an extra RO. The CRS has directed you to perform CPS 9072.01 Steam Bypass Valve Tests.
CPS 9072.01 Section 5.0 Prerequisites are complete.
The activity has been screened for production risk.
The activity has been screened for production risk.
Another operator will monitor BPV positions at 1H13-P678.
Report to the CRS after completing the task.
START TIME:
Page 6 of 12


Another operator will monitor BPV positions at 1H1 3-P678. Report to the CRS after completing the task.
JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)
START TIME: 
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
 
PERFORMANCE STEPS CPS 9072.01 Steam Bypass Valve Tests Comment SAT      UNSAT STEP                     ELEMENT                                       STANDARD Number Step 8.2 1     Performs pre-test verifications.
JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Examinee locates the position meters for Bypass Valves 1-6 on 1H13-P678 and verifies they read 0% and then initials step 8.2 of the surveillance.
Page 7 of 12 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
                                                          *Note to evaluator - if the examinee requests the training instructor stationed at P678 to perform the verification, cue the examinee to perform the verifications instead.
PERFORMANCE STEPS CPS 9072.01 Steam Bypass Valve Tests STEP ELEMENT STANDARD SAT UNSAT Comment Number 1 Performs pre
Procedure step 8.3 is NA - step only applies if the plant is shutdown with a low vacuum condition present.
-test verifications.
Step 8.4
Step 8.2 Examinee locates the position meters for Bypass Valves 1
  *2     Aligns system for testing.
-6 on 1H13-P678 and verifies they read 0% and then initials step 8.2 of the surveillance.
Examinee locates and depresses the BPV testing push-button on 1H13-P680-5006, and then verifies the:
*Note to evaluator  
- if the examinee requests the training instructor stationed at P678 to perform the verification, cue the examinee to perform the verifications instead. Procedure step 8.3 is NA  
- step only applies if the plant is shutdown with a low vacuum condition present.
  *2 Aligns system for testing.
Step 8.4 Examinee locates and depresses the BPV testing push
-button on 1H13
-P680-5006, and then verifies the:
* TESTING light energizes
* TESTING light energizes
* READY TO SELECT light energizes
* READY TO SELECT light energizes
* OFF light de
* OFF light de-energizes Examinee initials blanks for steps 8.4.1, 8.4.2, and 8.4.3.
-energizes Examinee initials blanks for steps 8.4.1, 8.4.2, and 8.4.3.
Page 7 of 12


JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 8 of 12  STEP ELEMENT STANDARD SAT UNSAT Comment Number *3 Strokes #1 BPV from fully open to fully shut. 8.5.1.3 Examinee depresses and holds the TEST BPV 1 push
Comment SAT    UNSAT STEP                 ELEMENT                                   STANDARD Number
-button on 1H13
*3   Strokes #1 BPV from fully open to fully   8.5.1.3 shut.                                    Examinee depresses and holds the TEST BPV 1 push-button on 1H13-P680-5006 and observes the following:
-P680-5006 and observes the following:
: 1. Annunciator 5006-5M BYPASS VALVE OPEN CHECK LPSP alarms
: 1. Annunciator 5006
: 2. The #1 BPV fast acting solenoid energizes during the last 5-15% of of travel.
-5M BYPASS VALVE OPEN CHECK LPSP alarms
: 3. The #1 BPV CLOSED light is de-energized.
: 2. The #1 BPV fast acting solenoid energizes during the last 5
-15% of of travel.
: 3. The #1 BPV CLOSED light is de
-energized.
: 4. The #1 BPV FULL OPEN light is energized.
: 4. The #1 BPV FULL OPEN light is energized.
: 5. 1H13-P678 meter indication for #1 BPV indicates ~ 100% and stops moving. Cue - When #1 BPV reaches 100% open, the Training Instructor stationed at 1H13
: 5. 1H13-P678 meter indication for #1 BPV indicates ~ 100% and stops moving.
-P678 should cue the examinee that #1 BPV opened quickly the last 10% of opening travel and that the meter stopped moving. 8.5.1.4 Examinee releases the TEST BPV 1 push-button on 1H13
Cue - When #1 BPV reaches 100% open, the Training Instructor stationed at 1H13-P678 should cue the examinee that #1 BPV opened quickly the last 10% of opening travel and that the meter stopped moving.
-P680-5006 and observes the following:
8.5.1.4 Examinee releases the TEST BPV 1 push-button on 1H13-P680-5006 and observes the following:
: 1. The #1 BPV FULL OPEN light is de
: 1. The #1 BPV FULL OPEN light is de-energized.
-energized.
: 2. The #1 BPV OPEN light is de-energized.
: 2. The #1 BPV OPEN light is de
-energized.
: 3. The #1 BPV CLOSED light is energized.
: 3. The #1 BPV CLOSED light is energized.
: 4. 1H13-P678 meter indication for #1 BPV indicates ~ 0% and stops moving. 5. Annunciator 5006
: 4. 1H13-P678 meter indication for #1 BPV indicates ~ 0% and stops moving.
-5M BYPASS VALVE OPEN CHECK LPSP resets Cue - When #1 BPV reaches 0% open, the Training Instructor stationed at 1H13
: 5. Annunciator 5006-5M BYPASS VALVE OPEN CHECK LPSP resets Cue - When #1 BPV reaches 0% open, the Training Instructor stationed at 1H13-P678 should cue the examinee that #1 BPV meter is indicating 0% and has stopped moving.
-P678 should cue the examinee that #1 BPV meter is indicating 0% and has stopped moving.
Page 8 of 12
JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)
 
Page 9 of 12  STEP ELEMENT STANDARD SAT UNSAT Comment Number Evaluators
JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Comment SAT    UNSAT STEP                       ELEMENT                                     STANDARD Number Evaluators
* JPM Step #4 is optional - if desired, cue the examinee to proceed to CPS 9072.01 step 8.6 and perform step 8.6 and remaining steps of the surveillance.
* JPM Step #4 is optional - if desired, cue the examinee to proceed to CPS 9072.01 step 8.6 and perform step 8.6 and remaining steps of the surveillance.
* If performing JPM step #4 on the remaining Bypass Valves, the examinee should allow a 7 minute stabilization period between cycling each BPV (procedure recommendation only).
* If performing JPM step #4 on the remaining Bypass Valves, the examinee should allow a 7 minute stabilization period between cycling each BPV (procedure recommendation only).
*4 (optional)
8.5.2.3 (8.5.3.3, 8.5.4.3, 8.5.5.3, 8.5.6.3)
Strokes #2 - 6 BPV s fully open, and then fully shut.
Examinee depresses and holds the TEST BPV 2-6 push-buttons (one at a time) on 1H13-P680-5006 and observes the following:
Evaluator placekeeping table
: 1. Annunciator 5006-5M BYPASS VALVE OPEN CHECK LPSP alarms for each valve tested.
- check after each BPV is tested.
BPV #2 BPV #3 BPV #4 BPV #5 BPV #6      8.5.2.3 (8.5.3.3, 8.5.4.3, 8.5.5.3, 8.5.6.3)
Examinee depresses and holds the TEST BPV 2
-6 push-buttons (one at a time) on 1H13
-P680-5006 and observes the following:
: 1. Annunciator 5006
-5M BYPASS VALVE OPEN CHECK LPSP alarms for each valve tested.
: 2. The respective BPV fast acting solenoid energizes during the last 5-15% of of travel.
: 2. The respective BPV fast acting solenoid energizes during the last 5-15% of of travel.
: 3. The respective BPV CLOSED light is de-energized.
: 3. The respective BPV CLOSED light is de-energized.
: 4. The respective BPV FULL OPEN light is energized.
Strokes #2 - 6 BPVs fully open, and
: 5. 1H13-P678 meter indication for the respective BPV indicates ~ 100% and stops moving.
: 4. The respective BPV FULL OPEN then fully shut.
Cue - When respective BPV reaches 100% open, the Training Instructor stationed at 1H13
light is energized.
-P678 should cue the examinee that #1 BPV opened quickly the last 10% of opening travel and that the meter stopped moving.
: 5. 1H13-P678 meter indication for the respective BPV indicates ~ 100%
8.5.2.4 (8.5.3.4, 8.5.4.4, 8.5.5.4, 8.5.6.4)
and stops moving.
Examinee releases the TEST BPV 1 push-button on 1H13
    *4                                                      Cue - When respective BPV reaches (optional)                                                  100% open, the Training Instructor stationed at 1H13-P678 should cue the examinee that #1 BPV opened quickly the Evaluator placekeeping table - check after each BPV is tested.          last 10% of opening travel and that the BPV    BPV      BPV      BPV    BPV              meter stopped moving.
-P680-5006 and observes the following:
                #2      #3      #4      #5      #6    8.5.2.4 (8.5.3.4, 8.5.4.4, 8.5.5.4, 8.5.6.4)
: 1. The respective BPV FULL OPEN light is de
Examinee releases the TEST BPV 1 push-button on 1H13-P680-5006 and observes the following:
-energized.
: 1. The respective BPV FULL OPEN light is de-energized.
: 2. The respective BPV OPEN light is de-energized.
: 2. The respective BPV OPEN light is de-energized.
: 3. The respective BPV CLOSED light is energized.
: 3. The respective BPV CLOSED light is energized.
: 4. 1H13-P678 meter indication for  
: 4. 1H13-P678 meter indication for #1 BPV indicates ~ 0% and stops moving.
#1 BPV indicates ~ 0% and stops moving. 5. Annunciator 5006
: 5. Annunciator 5006-5M BYPASS VALVE OPEN CHECK LPSP resets Page 9 of 12
-5M BYPASS VALVE OPEN CHECK LPSP resets  


JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 10 of 12 STEP ELEMENT STANDARD SAT UNSAT Comment Number Cue - When the respective BPV reaches 0% open, the Training Instructor stationed at 1H13-P678 should cue the examinee that the BPV meter is indicating 0% and has stopped moving.
Comment SAT    UNSAT STEP                 ELEMENT                             STANDARD Number Cue - When the respective BPV reaches 0% open, the Training Instructor stationed at 1H13-P678 should cue the examinee that the BPV meter is indicating 0% and has stopped moving.
*5 Restores system alignment.
8.6 - When all bypass valves have been tested, examinee momentarily depresses the OFF push-button on 1H13-P680-5006, and then verifies the following:
8.6 - When all bypass valves have been tested, examinee momentarily depresses the OFF push
* TESTING light de-energizes
-button on 1H13-P680-5006, and then verifies the following:
* READY TO SELECT light de-energizes
* TESTING light de
* OFF light energizes
-energizes
  *5          Restores system alignment.
* READY TO SELECT light de
8.7 - Notifies the Electrical Supply Dispatcher and the Exelon Power Team of the test completion.
- energizes
* OFF light energizes 8.7 - Notifies the Electrical Supply Dispatcher and the Exelon Power Team of the test completion.
Cue - Notify the examinee that the JPM is complete.
Cue - Notify the examinee that the JPM is complete.
TERMINATING CUES:
TERMINATING CUES:
The Steam Bypass Valves have been tested IAW CPS 9072.01 Steam Bypass Valve Tests
The Steam Bypass Valves have been tested IAW CPS 9072.01 Steam Bypass Valve Tests.
. STOP TIME:
STOP TIME:
Page 10 of 12
 
JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
 
==Title:==
&#xa3; EO              &#xa3; RO                &#xa3; SRO            &#xa3; STA          &#xa3; SRO Cert JPM
 
==Title:==
Steam Bypass Valve Tests JPM Number:      JPM419                                                        Revision Number: 00 Task Number and


JPM Number:  JPM419  - rev 00  Clinton Power Station Job Performance Measure (JPM)
==Title:==
SRRS: 3D.105 (when utilized for operator initial or continuing training)
907201.01 Steam Bypass Valve Tests K/A System         K/A Number                     Importance (RO/SRO) 241000               A4.06                      3.9                 3.9 Reactor Turbine Pressure Regulating System - Ability to manually operate and/or monitor in the control room: Bypass valves (operation).
Page 11 of 12 Operator's Name:
Suggested Testing Environment:                 Simulator Actual Testing Environment:               &#xa2; Simulator             &#xa3; Plant         &#xa3; Control Room Testing Method:         &#xa3; Simulate                     Alternate Path:       &#xa3; Yes       &#xa2; No
Job Title:
                          &#xa2; Perform                           SRO Only:       &#xa3; Yes       &#xa2; No Time Critical:       &#xa3; Yes           &#xa2; No Estimated Time to Complete:           10 minutes*                 Actual Time Used:             minutes
&#xa3;  EO &#xa3;  RO &#xa3;  SRO &#xa3;  STA &#xa3;  SRO Cert JPM Title:
*only if JPM step 4 is omitted, otherwise 60 minutes
Steam Bypass Valve Tests JPM Number:
JPM 419 Revision Number:
0 0 Task Number and Title:
907201.01 Steam Bypass Valve Tests K/A System K/A Number Importance (RO/SRO) 241000 A 4.0 6 3.9 3.9 Reactor Turbine Pressure Regulating System  
- Ability to manually operate and/or monitor in the control room: Bypass valves (operation).
Suggested Testing Environment:
Simulator Actual Testing Environment:
&#xa2;   Simulator &#xa3; Plant &#xa3; Control Room Testing Method:
&#xa3; Simulate Alternate Path:
&#xa3; Yes &#xa2; No   &#xa2; Perform SRO Only: &#xa3; Yes &#xa2; No Time Critical:
&#xa3; Yes &#xa2; No Estimated Time to Complete:
10 minutes* Actual Time Used:
minutes *only if JPM step 4 is omitted, otherwise 60 minutes


==References:==
==References:==
CPS No. 9072.01, Rev 32e Steam Bypass Valve Tests EVALUATION  
CPS No. 9072.01, Rev 32e Steam Bypass Valve Tests EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                 &#xa3; Yes       &#xa3; No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             &#xa3; Satisfactory             &#xa3; Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                              (Print)
&#xa3; Yes &#xa3; No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Signature:                                                              Date:
&#xa3; Satisfactory
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            Page 11 of 12
&#xa3; Unsatisfacto ry Comments:


Evaluator's Name:
(Print)
Evaluator's Signature:
Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 12 of 12  INITIAL CONDITIONS:
INITIAL CONDITIONS:
The reactor is in Mode 1 at ~ 50% power. INITIATING CUE:
The reactor is in Mode 1 at ~ 50% power.
CAUTION &sect; All pre-job briefings are completed.
INITIATING CUE:
You are an extra RO. The CRS has directed you to perform CPS 90 72.01 Steam Bypass Valve Tests
CAUTION
. CPS 9072.01 Section 5.0 Prerequisites are complete.
                &sect; All pre-job briefings are completed.
You are an extra RO. The CRS has directed you to perform CPS 9072.01 Steam Bypass Valve Tests.
CPS 9072.01 Section 5.0 Prerequisites are complete.
The activity has been screened for production risk.
The activity has been screened for production risk.
Another operator will monitor BPV positions at 1H13-P678.
Report to the CRS after completing the task.
Page 12 of 12


Another operator will monitor BPV positions at 1H13
CLINTON POWER STATION Job Performance Measure Perform a HPCS Pump Operability Test (Alternate Path)
-P678. Report to the CRS after completing the task.
JPM Number: JPM288 Revision Number: 02 Date: 8/29/16 Developed By:       Tony Jennings                   8/29/16 Instructor                       Date Validated By:     Matt Baker                       10/25/16 SME or Instructor               Date Reviewed By:       Jim Lucas                       11/15/16 Operations Representative       Date Approved By:       T. Jennings                     11/15/16 Training Department             Date JPM288_R2 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111
JPM288_R2 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure Perform a HPCS Pump Operability Test (Alternate Path)
 
JPM Number: JPM288 Revision Number: 0 2 Date: 8/29/16 Developed By:
JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Tony Jennings 8/29/16   Instructor Date Validated By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Matt Baker 10/25/16   SME or Instructor Date Reviewed By:
Jim Lucas 11/15/16   Operations Representative Date Approved By:
T. Jennings 11/15/16   Training Department Date JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 2 of 12 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure CPS 9051.01             Rev: 48 Procedure CPS 9051.01D001         Rev: 48 Procedure CPS 5062.04             Rev: 27b
Procedure CPS 9051.01 Rev: 4 8  Procedure CPS 9051.01D001 Rev: 48 Procedure CPS 5062.04 Rev: 27b ________ 9. Verify cues both verbal and visual are free of conflict.
________     9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________     10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
SME / Instructor                                   Date SME / Instructor                                   Date SME / Instructor                                   Date Page 2 of 12
Page 3 of 12 Revision Record (Summary)
 
Revisi on Date Description 0 6/21/12 New JPM 1 8/4/14 Updated procedure references.
JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
2 8/29/16 Updated procedure references.
Revision Record (Summary)
Revision  Date                           Description 0     6/21/12 New JPM 1     8/4/14 Updated procedure references.
2     8/29/16 Updated procedure references.
Page 3 of 12


JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 4 of 12 Simulator Setup Instructions
Simulator Setup Instructions
: 1. IC Setup a. Reset the simulator to any at power IC with HPCS Suction aligned to the RCIC Storage Tank (E22F001 open, E22F015 shut)
: 1. IC Setup
. b. Place the HPCS Out of Service Switch to INOP. c. Place the HPCS Test Prep Switch to TEST.
: a. Reset the simulator to any at power IC with HPCS Suction aligned to the RCIC Storage Tank (E22F001 open, E22F015 shut).
: d. Save to a different IC if JPM is being used more than once. IC
: b. Place the HPCS Out of Service Switch to INOP.
-225 (pw: 76319) is saved for the ILT 15
: c. Place the HPCS Test Prep Switch to TEST.
-1 NRC Exam.
: d. Save to a different IC if JPM is being used more than once. IC-225 (pw: 76319) is saved for the ILT 15-1 NRC Exam.
: 2. Simulator Setup
: 2. Simulator Setup
: a. Reset the simulator to the IC established in step 1 above.
: a. Reset the simulator to the IC established in step 1 above.
: b. Open and execute Simulator Lesson Plan ILT 15-1 NRC Exam JPMs.
: b. Open and execute Simulator Lesson Plan ILT 15-1 NRC Exam JPMs.
: c. Release JPM288 to cause the following:
: c. Release JPM288 to cause the following:
* Energizes 1E22
* Energizes 1E22-F010 (completed prerequisite in 9051.01)
-F010 (completed prerequisite in 9051.01)
* Fails 1E22-F001 Green light to off and Red light to on
* Fails 1E22
* Close 1E22-F001 (simulates suction clogging/collapsing) when HPCS flow is approximately greater than 2000 gpm.
-F001 Green light to off and Red light to on
* Fails 1E22-F015 Control Switch to the Close position.
* Close 1E22
: d. Verify HPCS Out of Service Switch to INOP.
-F001 (simulates suction clogging/collapsing) when HPCS flow is approximately greater than 2000 gpm.
: e. Verify HPCS Test Prep Switch to TEST.
* Fails 1E22
: 3. WHEN IC IS RESET, OVERRIDE SWITCH CHECK FOR A05-A02-A15S23 (if necessary).
-F015 Control Switch to the Close position.
Page 4 of 12
: d. Verify HPCS "Out of Service" Switch to INOP
 
. e. Verify HPCS Test Prep Switch to TEST
JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
. 3. WHEN IC IS RESET, OVERRIDE SWITCH CHECK FOR A05
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
-A02-A15S23 (if necessary)
TASK STANDARDS:
.
JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 12 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
:
* HPCS Pump has been tripped due to loss of suction source.
* HPCS Pump has been tripped due to loss of suction source.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
Line 1,991: Line 1,947:


==REFERENCES:==
==REFERENCES:==
* CPS No. 9051.01, Rev 4 8 HPCS Pump HPCS Water Leg Pump Operability
* CPS No. 9051.01, Rev 48 HPCS Pump HPCS Water Leg Pump Operability
* CPS No. 9051.01D001, Rev 48 HPCS Pump HPCS Water Leg Pump Operability Data Sheet
* CPS No. 9051.01D001, Rev 48 HPCS Pump HPCS Water Leg Pump Operability Data Sheet
* CPS No. 5062.04 , Rev 27 b Alarm Panel 5062 Annunciators
* CPS No. 5062.04, Rev 27b Alarm Panel 5062 Annunciators - Row 4 EVALUATOR INSTRUCTIONS:
- Row 4 EVALUATOR INSTRUCTIONS:
* Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
* Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
* Provide the examinee with mark ed up copies of :
* Provide the examinee with marked up copies of :
o CPS No. 9051.01, HPCS Pump & HPCS Water Leg Pump Operability  
o CPS No. 9051.01, HPCS Pump & HPCS Water Leg Pump Operability - up to and including step 8.2.7.1.
- up to and including step 8.2.7.1.
o CPS No. 9051.01D001, HPCS Pump & HPCS Water Leg Pump Operability Data Sheet -
o CPS No. 9051.01D001, HPCS Pump & HPCS Water Leg Pump Operability Data Sheet
up to and including any data collected up to step 8.2.7.1.
up to and including any data collected up to step 8.2.7.1.
* Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
* All pre-job briefings are completed.
Page 5 of 12


JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 12  INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are the Extra RO assuming the shift.
You are the Extra RO assuming the shift.
CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability is in progress.
CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability is in progress.
An Equipment Operator is stationed locally at the HPCS Pump and has established communication with the Main Control Room.
An Equipment Operator is stationed locally at the HPCS Pump and has established communication with the Main Control Room.
INITIATING CUE:
INITIATING CUE:
Continue performing CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability commencing at step 8.2.7.2. Inform the CRS when section 8.2 is complete.
Continue performing CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability commencing at step 8.2.7.2.
START TIME:
Inform the CRS when section 8.2 is complete.
START TIME:
Page 6 of 12


JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 7 of 12 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
9051.01 HPCS PUMP & HPCS WATER LEG PUMP OPERABILITY 8.2.7.2 Verify HPCS WATER LEG DISCHARGE PRESSURE LOW annunciator 5062
9051.01 HPCS PUMP & HPCS WATER LEG PUMP OPERABILITY 8.2.7.2       Verify HPCS WATER LEG DISCHARGE PRESSURE LOW annunciator 5062-7D is cleared.
-7D is cleared.
Standard:           Examinee observes annunciator 5062-7D is clear (not illuminated).
Standard: Examinee observes annunciator 5062
Cue:
-7D is clear (not illuminated
Comments SAT &#xa3;             UNSAT &#xa3;                 Comment Number
). Cue: Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number
    *8.2.7.3       Start HPCS Pump, 1E22-C001.
  *8.2.7.3 Start HPCS Pump, 1E22
Standard:           Examinee places control switch for 1E22-C001 to the START position. Verifies RED light ON, GREEN light OFF. Observes HPCS motor current pegging high and then lowering into the meter green band.
-C001. Standard: Examinee places control switch for 1E22
Cue:
-C001 to the 'START' position. Verifies RED light ON, GREEN light OFF. Observes HPCS motor current pegging high and then lowering into the meter green band
Comments SAT &#xa3;             UNSAT &#xa3;                 Comment Number Page 7 of 12
. Cue: Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number


JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM) 8.2.7.4.1 Observe/perform (Record): Verify 1E22-F012, HPCS Pump Min Flow To Suppr Pool, indicates open.
Page 8 of 12  8.2.7.4.1 Observe/perform (Record):   Verify 1E22
Standard:     Examinee observes RED light ON, GREEN light OFF for 1E22-F012. Records SAT on the data sheet for step 8.2.7.4.1 (D001 page 6).
-F012, HPCS Pump Min Flow To Suppr Pool, indicates open.
Cue:
Standard: Examinee observes RED light ON, GREEN light OFF for 1E22
Comments SAT &#xa3;               UNSAT &#xa3;               Comment Number
-F012. Records "SAT" on the data sheet for step 8.2.7.4.1 (D001 page 6)
   *8.2.7.4.2 Alternately slowly throttle open both 1E22-F010 and 1E22-F011, HPCS First and Second Test Vlv To Storage Tank, and increase flow to ~ 5050 gpm as read on Comp Pt HP-DA301.
. Cue: Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number
Standard:     Examinee alternately places both control switches for 1E22-F010 and 1E22-F011 to the throttle open position.
   *8.2.7.4.2 Alternately slowly throttle open both 1E22
Cue:         If examinee reports receipt of Annunciator 5062-4D, acknowledge report.
-F010 and 1E22
Comments     The suction line will start clogging when HPCS flow exceeds approximately 2000 gpm. HPCS Pump amps and flow will rapidly oscillate.
-F011, HPCS First and Second Test Vlv To Storage Tank, and increase flow to ~ 5050 gpm as read on Comp Pt HP
SAT &#xa3;               UNSAT &#xa3;               Comment Number Page 8 of 12
-DA301. Standard: Examinee alternately places both control switches for 1E22-F010 and 1E22
-F011 to the throttle open position
. Cue: If examinee reports receipt of Annunciator 5062
-4D, acknowledge report
. Comments The suction line will start clogging when HPCS flow exceeds approximately 2000 gpm. HPCS Pump amps and flow will rapidly oscillate.
SAT   &#xa3; UNSAT   &#xa3; Comment Number


JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 9 of 12 BEGINS ALTERNATE PATH 5062-4D, HPCS PUMP SUCTION PRESSURE ABNORMAL NOTE: Steps 1 and 2 may be performed in any order.
BEGINS ALTERNATE PATH 5062-4D, HPCS PUMP SUCTION PRESSURE ABNORMAL NOTE: Steps 1 and 2 may be performed in any order.
: 1. Verify/establish an available HPCS Suction Path (1E22
: 1.       Verify/establish an available HPCS Suction Path (1E22-F001 preferred unless RCIC Tank/Suction Piping is not available) per CPS 3309.01, High Pressure Core Spray (HPCS). Refer to CPS 3309.01 (HPCS) CLOC PRECAUTION criteria.
-F001 preferred unless RCIC Tank/Suction Piping is not available) per CPS 3309.01, High Pressure Core Spray (HPCS). Refer to CPS 3309.01 (HPCS) CLOC PRECAUTION criteria.
Standard:     Examinee verifies 1E22-F001 is full open (red light ON, green light OFF).
Standard: Examinee verifies 1E22
Cue:
-F001 is full open (red light ON, green light OFF)
Comments       Examinee may elect to trip the HPCS Pump based on abnormal indications without referring to the Annunciator Response Procedure. This is an acceptable action.
. Cue: Comments Examinee may elect to trip the HPCS Pump based on abnormal indications without referring to the Annunciator Response Procedure. This is an acceptable action. SAT   &#xa3; UNSAT   &#xa3; Comment Number
SAT &#xa3;               UNSAT &#xa3;               Comment Number
  *2 If HPCS pump is running for testing, and normal suction pressure was not restored by the previous step, trip the HPCS pump.
      *2       If HPCS pump is running for testing, and normal suction pressure was not restored by the previous step, trip the HPCS pump.
Standard: Examinee trips the HPCS Pump using the associated control switch.
Standard:     Examinee trips the HPCS Pump using the associated control switch.
Cue: If an operator is dispatched to investigate, cue the examinee that loud 'surging' noises are coming from the HPCS Pump.
Cue:           If an operator is dispatched to investigate, cue the examinee that loud surging noises are coming from the HPCS Pump.
Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number
Comments SAT &#xa3;               UNSAT &#xa3;               Comment Number Page 9 of 12


JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 10 of 12  Informs Control Room Supervisor.
Informs Control Room Supervisor.
Standard: Examinee informs Control Room Supervisor the HPCS was tripped per Annunciator Response Procedure.
Standard:       Examinee informs Control Room Supervisor the HPCS was tripped per Annunciator Response Procedure.
Cue: Acknowledge the report. State JPM is complete.
Cue:           Acknowledge the report. State JPM is complete.
Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number TERMINATING CUES:
Comments SAT &#xa3;             UNSAT &#xa3;               Comment Number TERMINATING CUES:
HPCS Pump has been tripped due to loss of suction source.
HPCS Pump has been tripped due to loss of suction source.
STOP TIME:
STOP TIME:
Page 10 of 12


JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Operators Name:
Page 11 of 12 Operator's Name:    Job Title:
Job
&#xa3; NLO &#xa3; RO &#xa3; SRO &#xa3; STA &#xa3; SRO Cert JPM Title:
 
==Title:==
&#xa3; NLO             &#xa3; RO               &#xa3; SRO           &#xa3; STA         &#xa3; SRO Cert JPM
 
==Title:==
Perform a HPCS Pump Operability Test (Alternate Path)
Perform a HPCS Pump Operability Test (Alternate Path)
JPM Number:
JPM Number:     JPM288                                                       Revision Number: 02 Task Number and
JPM288 Revision Number:
 
0 2 Task Number and Title:
==Title:==
905101.06 - HPCS Pump & HPCS Water Leg Pump Operability K/A System K/A Number Importance (RO/SRO) 209002 A4.01 3.7 3.7 Ability to manually operate and/or monitor in the control room: HPCS pump. Suggested Testing Environment:
905101.06 - HPCS Pump & HPCS Water Leg Pump Operability K/A System         K/A Number                     Importance (RO/SRO) 209002             A4.01                           3.7                 3.7 Ability to manually operate and/or monitor in the control room: HPCS pump.
Simulator Actual Testing Environment:
Suggested Testing Environment:                 Simulator Actual Testing Environment:               &#xa2; Simulator             &#xa3; Plant         &#xa3; Control Room Testing Method:         &#xa3; Simulate                     Alternate Path:       &#xa2; Yes       &#xa3; No
&#xa2; Simulator &#xa3; Plant &#xa3; Control Room Testing Method:
                          &#xa2; Perform                           SRO Only:       &#xa3; Yes       &#xa2; No Time Critical:       &#xa3; Yes           &#xa2; No Estimated Time to Complete: 15 minutes                             Actual Time Used:             minutes
&#xa3; Simulate Alternate Path:
 
&#xa2; Yes &#xa3; No   &#xa2; Perform SRO Only: &#xa3; Yes &#xa2; No Time Critical:
==References:==
&#xa3; Yes &#xa2; No Estimated Time to Complete:
15 minutes Actual Time Used:
minutes References
:
* CPS No. 9051.01, Rev 47e HPCS Pump HPCS Water Leg Pump Operability
* CPS No. 9051.01, Rev 47e HPCS Pump HPCS Water Leg Pump Operability
* CPS No. 9051.01D001, Rev 48 HPCS Pump HPCS Water Leg Pump Operability Data Sheet
* CPS No. 9051.01D001, Rev 48 HPCS Pump HPCS Water Leg Pump Operability Data Sheet
* *CPS No. 5062.04, Rev 27B Alarm Panel 5062 Annunciators
    *     *CPS No. 5062.04, Rev 27B Alarm Panel 5062 Annunciators - Row 4
- Row 4 *Procedure s with an asterisk do not need to be copied for the JPM administration.
              *Procedures with an asterisk do not need to be copied for the JPM administration.
EVALUATION  
EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                 &#xa3; Yes       &#xa3; No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             &#xa3; Satisfactory             &#xa3; Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                            (Print)
&#xa3; Yes &#xa3; No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Signature:                                                              Date:
&#xa3; Satisfactory
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            Page 11 of 12
&#xa3; Unsatisfactory Comments:


Evaluator's Name:
(Print)
Evaluator's Signature:
Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 12 of 12  INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are the Extra RO assuming the shift.
You are the Extra RO assuming the shift.
CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability is in progress.
CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability is in progress.
An Equipment Operator is stationed locally at the HPCS Pump and has established communication with the Main Control Room.
An Equipment Operator is stationed locally at the HPCS Pump and has established communication with the Main Control Room.
INITIATING CUE:
INITIATING CUE:
Continue performing CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability commencing at step 8.2.7.2. Inform the CRS when section 8.2 is complete.
Continue performing CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability commencing at step 8.2.7.2.
Inform the CRS when section 8.2 is complete.
Page 12 of 12


JPM473_R0 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure Place Feedwater Leakage Control (FWLC) In
CLINTON POWER STATION Job Performance Measure Place Feedwater Leakage Control (FWLC) In-Service JPM Number: JPM473 Revision Number: 00 Date: 9/14/16 Developed By:         T. Jennings                       9/14/16 Instructor                         Date Validated By:         Matt Baker                         10/26/16 SME or Instructor                 Date Reviewed By:         Jim Lucas                         11/15/16 Operations Representative         Date Approved By:         T. Jennings                       11/15/16 Training Department               Date JPM473_R0 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111
-Service JPM Number: JPM473 Revision Number: 0 0 Date: 9/14/16 Developed By:
 
T. Jennings 9/14/16   Instructor Date Validated By:
JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Matt Baker 10/26/16   SME or Instructor Date Reviewed By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Jim Lucas 11/15/16   Operations Representative Date Approved By:
T. Jennings 11/15/16   Training Department Date JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
(*).
Procedure CPS 3312.01 Rev: 45b Procedure Rev: Procedure Rev: ________ 9. Verify cues both verbal and visual are free of conflict.
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 10. Verify performance time is accurate
Procedure CPS 3312.01               Rev: 45b Procedure                           Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Procedure                           Rev:
________     9. Verify cues both verbal and visual are free of conflict.
________     10. Verify performance time is accurate
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date Page 2 of 10


SME / Instructor Date SME / Instructor Date SME / Instructor Date JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 10 Revision Record (Summary)
Revision Record (Summary)
Revision Date Description 00 9/14/16 New JPM.
Revision Date                           Description 00     9/14/16 New JPM.
JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 10
Page 4 of 10 Simulator Setup Instructions
 
: 1. IC Setup a. Reset the simulator to any shutdown IC.
JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)
: b. Open or verify open 1B21
Simulator Setup Instructions
-F065A and B RPV Inlet Valves.
: 1. IC Setup
: a. Reset the simulator to any shutdown IC.
: b. Open or verify open 1B21-F065A and B RPV Inlet Valves.
: c. Open and execute Simulator Lesson Plan JPM473 containing the following:
: c. Open and execute Simulator Lesson Plan JPM473 containing the following:
: 1) RAT_B_DIFFERENTIAL
: 1)   RAT_B_DIFFERENTIAL
: 2) YP_XMFTB_1 HPCS PMP MTR COUPLING FAILURE
: 2)   YP_XMFTB_1 HPCS PMP MTR COUPLING FAILURE
: 3) YFRIPPSS RCIC PUMP SHEARED SHAFT
: 3)   YFRIPPSS RCIC PUMP SHEARED SHAFT
: 4) Ed01LMalfMot(32) = 3 LPCS Motor Short Circuit
: 4)   Ed01LMalfMot(32) = 3 LPCS Motor Short Circuit
: 5) Ed01LMalfMot(35) = 3 RHR Pump C002C Motor Short Circuit
: 5)   Ed01LMalfMot(35) = 3 RHR Pump C002C Motor Short Circuit
: 6) YPXMALSE_510 RR03B
: 6)   YPXMALSE_510 RR03B-RR B SUCTION LINE LEAK (51%)
-RR B SUCTION LINE LEAK (51%)
: d. Allow ADS to automatically initiate and depressurize the RPV.
: d. Allow ADS to automatically initiate and depressurize the RPV.
: e. Ensure plant is stable and then save to a different IC if JPM is being used more than once.
: e. Ensure plant is stable and then save to a different IC if JPM is being used more than once.
IC-227 (pw: 76319) is saved for the ILT 15
IC-227 (pw: 76319) is saved for the ILT 15-1 NRC Exam.
-1 NRC Exam.
: 2. JPM Setup
: 2. JPM Setup a. Reset the simulator to the IC saved in Section 1 above with the reactor shutdown, a LOCA present, and RHR 'A' and 'B' operating in LPCI injection mode.
: a. Reset the simulator to the IC saved in Section 1 above with the reactor shutdown, a LOCA present, and RHR A and B operating in LPCI injection mode.
: b. No Simulator Lesson Plan is required once the IC has been established.
: b. No Simulator Lesson Plan is required once the IC has been established.
: c. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
: c. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
: d. This completes the setup for this JPM.
: d. This completes the setup for this JPM.
: e. Place the simulator in freeze.
: e. Place the simulator in freeze.
Page 4 of 10


JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 10 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
TASK STANDARDS:
:
* Examinee has successfully placed the Feedwater Leakage Control System (FWLCS) in service.
* Examinee has successfully placed the Feedwater Leakage Control System (FWLCS) in service
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
. TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
* CPS 33 12.01, Rev 45b RESIDUAL HEAT REMOVAL (RHR)
* CPS 3312.01, Rev 45b RESIDUAL HEAT REMOVAL (RHR)
EVALUATOR INSTRUCTIONS:
EVALUATOR INSTRUCTIONS:
* Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
* Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
* Provide the examinee with a copy of CPS 33 12.01, RESIDUAL HEAT REMOVAL (RHR) with the cue sheet.
* Provide the examinee with a copy of CPS 3312.01, RESIDUAL HEAT REMOVAL (RHR) with the cue sheet.
* Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
* All pre-job briefings are completed.
Page 5 of 10


JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 10  INITIAL CONDITIONS:
INITIAL CONDITIONS:
A Loss of Coolant Accident has occurred.
A Loss of Coolant Accident has occurred.
FW/CB/CD injection is no longer available.
FW/CB/CD injection is no longer available.
INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.
CAUTION
                &sect;   All pre-job briefings are completed.
This is a time critical JPM.
This is a time critical JPM.
The CRS has directed you to place Feedwater Leakage Control System (FWLCS) in service per CPS 3312.01 Residual Heat Removal (RHR) section 8.3.1 Feedwater Leakage Control System (FWLCS).
The CRS has directed you to place Feedwater Leakage Control System (FWLCS) in service per CPS 3312.01 Residual Heat Removal (RHR) section 8.3.1 Feedwater Leakage Control System (FWLCS).
Report to the CRS when the task has been completed.
Report to the CRS when the task has been completed.
START TIME:
START TIME:
Page 6 of 10


JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 7 of 10 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 3312.01, Residual Heat Removal (RHR) Section 8.3.1 STEP ELEMENT STANDARD S AT UNSAT Comment Number *1      
PERFORMANCE STEPS CPS 3312.01, Residual Heat Removal (RHR) Section 8.3.1 Comment SAT      UNSAT STEP                       ELEMENT                                 STANDARD Number
*1           Aligns RHR A and B to the Feedwater  8.3.1.1 Leakage Control (FWLC) System.            Examinee determines FW/CB/CD injection is no longer available.
Cue: If asked, cue the examinee that FW/CB/CD injection is no longer available.
Evaluator - Record current time: ________
                                                        *8.3.1.2 Examinee rotates the control switches for 1B21-F065A and B RPV Inlet Valves (1H13-P870-5016) counter clockwise to the close position and verifies green lights are illuminated and red lights are extinguished.
8.3.1.3 Examinee observes that RPV pressure is <
330 psig using PPC or MCR meter indications.
8.3.1.4 Examinee observes that RHR Pumps A and B are operating in LPCI mode.
                                                        *8.3.1.5 On 1H13-P601-5065, examinee turns the control switch for 1E12-F496, RHR to Feedwater B Keep Fill Valve clockwise to the Open position and verifies red light illuminated and green light extinguished.
Page 7 of 10


Aligns RHR 'A' and 'B' to the Feedwater Leakage Control (FWLC) System.
JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)
8.3.1.1 Examinee determines FW/CB/CD injection is no longer available
Comment SAT      UNSAT STEP                ELEMENT                              STANDARD Number
. Cue: If asked, cue the examinee that FW/CB/CD injection is no longer available.
*1 (contd)                                     *8.3.1.6 On 1H13-P601-5064, examinee turns the control switch for 1E12-F497, RHR to Feedwater A Keep Fill Valve clockwise to the Open position and verifies red light illuminated and green light extinguished.
Evaluator
Evaluator - Record current time: ________
- Record current time: ________
Evaluator - Verify times recorded in step 8.3.1.6 and 8.3.1.1 does not exceed 20 minutes.
    *8.3.1.2 Examinee rotates the control switches for 1B21-F065A and B RPV Inlet Valves (1H13-P870-5016) counter clockwise to the close position and verifies green lights are illuminated and red lights are extinguished.
Cue: State the JPM is complete.
8.3.1.3 Examinee observes that RPV pressure is < 330 psig using PPC or MCR meter indications.
TERMINATING CUES:
8.3.1.4 Examinee observes that RHR Pumps A and B are operating in LPCI mode
RHR A and B are aligned to the Feedwater Leakage Control (FWLC) System.
.    *8.3.1.5 On 1H13-P601-5065, examinee turns the control switch for 1E12
STOP TIME:
-F496, RHR to Feedwater "B" Keep Fill Valve clockwise to the Open position and verifies red light illuminated and green light extinguished.
Page 8 of 10


JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 8 of 10 STEP ELEMENT STANDARD S AT UNSAT Comment Number *1 (cont'd) *8.3.1.6 On 1H13-P601-506 4, examinee turns the control switch for 1E12
Operators Name:
-F 49 7, RHR to Feedwater "
Job
A" Keep Fill Valve clockwise to the Open position and verifies red light illuminated and green light extinguished.
Evaluator
- Record current time: ________
Evaluator
- Verify times recorded in step 8.3.1.6 and 8.3.1.1 does not excee d 20 minutes. Cue: State the JPM is complete
. TERMINATING CUES:
RHR 'A' and 'B' are aligned to the Feedwater Leakage Control (FWLC) System.
STOP TIME: 


JPM Number:  JPM473  - rev 00  Clinton Power Station Job Performance Measure (JPM)
==Title:==
SRRS: 3D.105 (when utilized for operator initial or continuing training)
&#xa3; EO             &#xa3; RO               &#xa3; SRO           &#xa3; STA         &#xa3; SRO Cert JPM
Page 9 of 10 Operator's Name:
 
Job Title:
==Title:==
&#xa3; EO &#xa3; RO &#xa3; SRO &#xa3; STA &#xa3; SRO Cert JPM Title:
Place Feedwater Leakage Control (FWLC) In-Service JPM Number:       JPM473                                                      Revision Number: 00 Task Number and
Place Feedwater Leakage Control (FWLC) In
 
-Service JPM Number:
==Title:==
JPM 473 Revision Number:
0 0 Task Number and Title:
331201.22 Feedwater Leakage Control System (FWLCS)
331201.22 Feedwater Leakage Control System (FWLCS)
K/A System K/A Number Importance (RO/SRO) 2 23001 A2.01 4.3 4.4 Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of coolant accident Suggested Testing Environment:
K/A System         K/A Number                     Importance (RO/SRO) 223001                A2.01                     4.3                 4.4 Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of coolant accident Suggested Testing Environment:                 Simulator Actual Testing Environment:               &#xa2; Simulator             &#xa3; Plant         &#xa3; Control Room Testing Method:         &#xa3; Simulate                     Alternate Path:       &#xa3; Yes       &#xa2; No
Simulator Actual Testing Environment:
                          &#xa2; Perform                           SRO Only:       &#xa3; Yes       &#xa2; No Time Critical:       &#xa2; Yes           &#xa3; No Estimated Time to Complete:           10 minutes                 Actual Time Used:             minutes
&#xa2;   Simulator &#xa3; Plant &#xa3; Control Room Testing Method:
&#xa3; Simulate Alternate Path:
&#xa3; Yes &#xa2; No   &#xa2; Perform SRO Only: &#xa3; Yes &#xa2; No Time Critical:
&#xa2; Yes &#xa3; No Estimated Time to Complete:
1 0 minutes Actual Time Used:
minutes  


==References:==
==References:==
 
CPS 3312.01, Rev 45b RESIDUAL HEAT REMOVAL (RHR)
CPS 33 12.01, Rev 45 b RESIDUAL HEAT REMOVAL (RHR)
EVALUATION  
EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                 &#xa3; Yes       &#xa3; No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             &#xa3; Satisfactory             &#xa3; Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                              (Print)
&#xa3; Yes &#xa3; No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Signature:                                                              Date:
&#xa3; Satisfactory
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            Page 9 of 10
&#xa3; Unsatisfactory Comments:


Evaluator's Name:
(Print)
Evaluator's Signature:
Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 10 of 10  INITIAL CONDITIONS:
INITIAL CONDITIONS:
A Loss of Coolant Accident has occurred.
A Loss of Coolant Accident has occurred.
FW/CB/CD injection is no longer available.
FW/CB/CD injection is no longer available.
INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.
CAUTION
                &sect;   All pre-job briefings are completed.
This is a time critical JPM.
This is a time critical JPM.
The CRS has directed you to place Feedwater Leakage Control System (FWLCS) in service per CPS 3312.01 Residual Heat Removal (RHR) section 8.3.1 Feedwater Leakage Control System (FWLCS).
The CRS has directed you to place Feedwater Leakage Control System (FWLCS) in service per CPS 3312.01 Residual Heat Removal (RHR) section 8.3.1 Feedwater Leakage Control System (FWLCS).
Report to the CRS when the task has been completed.
Report to the CRS when the task has been completed.
Page 10 of 10
CLINTON POWER STATION Job Performance Measure Re-energize 4160V Bus 1A JPM Number: JPM503 Revision Number: 01 Date: 9/16/16 Developed By:          T. Jennings                        9/16/16 Instructor                        Date Validated By:        Brian Glynn                        10/25/16 SME or Instructor                  Date Reviewed By:          Jim Lucas                          11/15/16 Operations Representative          Date Approved By:          T. Jennings                        11/15/16 Training Department                Date JPM503_R1 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111


JPM503_R1 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure Re-energize 4160V Bus 1A JPM Number:  JPM503 Revision Number: 0 1 Date: 9/1 6/16  Developed By:
JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)
T. Jennings 9/1 6/16  Instructor Date  Validated By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Brian Glynn 10/25/16  SME or Instructor Date  Reviewed By:
Jim Lucas  11/15/16  Operations Representative Date  Approved By:
T. Jennings 11/15/16  Training Department Date JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
(*).
Procedure CPS 4200.01 Rev: 24 Procedure CPS 3501.01 Rev: 28c Procedure Rev: ________ 9. Verify cues both verbal and visual are free of conflict.
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 10. Verify performance time is accurate
Procedure CPS 4200.01               Rev: 24 Procedure CPS 3501.01               Rev:28c Procedure                           Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________     9. Verify cues both verbal and visual are free of conflict.
________     10. Verify performance time is accurate
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date Page 2 of 10


SME / Instructor Date SME / Instructor Date SME / Instructor Date JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 10 Revision Record (Summary)
Revision Record (Summary)
Revision Date Description 00 11/17/12 New JPM. 01 9/16/16 Updated procedure references. Updated to new template.
Revision   Date                           Description 00     11/17/12 New JPM.
01     9/16/16 Updated procedure references. Updated to new template.
Page 3 of 10


JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 4 of 10 Simulator Setup Instructions
Simulator Setup Instructions
: 1. IC Setup a. Initialize to any suitable at power IC.
: 1. IC Setup
: a. Initialize to any suitable at power IC.
: b. Verify CRD Pump B is running.
: b. Verify CRD Pump B is running.
: c. Insert a manual scram and allow the MDRFP to stabilize RPV level.
: c. Insert a manual scram and allow the MDRFP to stabilize RPV level.
: d. Place the following control switches in PTL or Lock/Stop:
: d. Place the following control switches in PTL or Lock/Stop:
: 1) Component Cooling Water Pump 1A, 1CC01PA
: 1)     Component Cooling Water Pump 1A, 1CC01PA
: 2) Component Cooling Water Pump 1C, 1CC01PC
: 2)     Component Cooling Water Pump 1C, 1CC01PC
: 3) Plant Service Water Pump 1A, 1WS01PA
: 3)     Plant Service Water Pump 1A, 1WS01PA
: 4) Plant Service Water Pump 1C, 1WS01PC
: 4)     Plant Service Water Pump 1C, 1WS01PC
: 5) Service Air Compressor 0, 0SA01C
: 5)     Service Air Compressor 0, 0SA01C
: 6) Condensate Pump 1A, 1CD01PA 7) Condensate Pump 1C, 1CD01PC
: 6)     Condensate Pump 1A, 1CD01PA
: 8) Condensate Booster A, 1CB01PA / Cond Booster Pmp 1A Aux Lube Oil Pmp, 1CB07PA
: 7)     Condensate Pump 1C, 1CD01PC
: 9) Condensate Booster C, 1CB01PC / Cond Booster Pmp 1C Aux Lube Oil Pmp, 1CB07PC
: 8)     Condensate Booster A, 1CB01PA / Cond Booster Pmp 1A Aux Lube Oil Pmp, 1CB07PA
: e. Save to a different IC if JPM is being used more than once. IC
: 9)     Condensate Booster C, 1CB01PC / Cond Booster Pmp 1C Aux Lube Oil Pmp, 1CB07PC
-22 6 (IC Password: 76319) is saved for ILT 15
: e. Save to a different IC if JPM is being used more than once. IC-226 (IC Password: 76319) is saved for ILT 15-1 NRC Exam. When IC-226 is reset, override switch check for A04_A23_S06 (if necessary).
-1 NRC Exam. When IC
: 2. JPM Setup
-226 is reset, override switch check for A04_A23_S06 (if necessary).
: a. Reset the simulator to the IC saved in Section 1 above.
: 2. JPM Setup a. Reset the simulator to the IC saved in Section 1 above.
: b. Open and execute simulator lesson plan ILT 15-1 NRC Exam JPMs.
: b. Open and execute simulator lesson plan ILT 15-1 NRC Exam JPMs. c. Release JPM503 which performs the following:
: c. Release JPM503 which performs the following:
: 1) Inserts override to switch 4160V BUS 1A RES BKR 1AP06EM to the PTL position.
: 1)     Inserts override to switch 4160V BUS 1A RES BKR 1AP06EM to the PTL position.
: 2) Overrides 1AP06EM GREEN LITE to ON.
: 2)     Overrides 1AP06EM GREEN LITE to ON.
: d. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
: d. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
: e. This completes the setup for this JPM.
: e. This completes the setup for this JPM.
: f. Freeze Simulator.
: f. Freeze Simulator.
Page 4 of 10


JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 10 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
TASK STANDARDS:
:
* 4160 Volt Bus 1A is re-energized per CPS 4200.01 Loss of AC Power section 4.3 and CPS 3501.01 High Voltage Auxiliary Power System section 8.1.2 Energizing 4160V Bus 1A, 1AP06E.
* 4160 Volt Bus 1A is re
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
-energized per CPS 4200.01 Loss of AC Power section 4.3 and CPS 3501.01 High Voltage Auxiliary Power System section 8.1.2 Energizing 4160V Bus 1A, 1AP06E. TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* None PROCEDURAL/
* None PROCEDURAL/


Line 2,314: Line 2,262:
o CPS 4200.01, section 4.3, all steps complete up to and including step 4.3.3.2.
o CPS 4200.01, section 4.3, all steps complete up to and including step 4.3.3.2.
o CPS 3501.01 (blank)
o CPS 3501.01 (blank)
JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 10
Page 6 of 10  INITIAL CONDITIONS:
 
JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS:
A scram has occurred.
A scram has occurred.
4160V Bus 1A failed to transfer to the reserve source due to a breaker failure
4160V Bus 1A failed to transfer to the reserve source due to a breaker failure.
. The breaker failure has been corrected.
The breaker failure has been corrected.
INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.
CAUTION
You are the 'B' RO.
              &sect;   All pre-job briefings are completed.
The CRS has directed you to re
You are the B RO.
-energize 4160V Bus 1A IAW CPS 4200.01 Loss of AC Power, section 4.3 Loss of Non
The CRS has directed you to re-energize 4160V Bus 1A IAW CPS 4200.01 Loss of AC Power, section 4.3 Loss of Non-ECCS Busses.
-ECCS Busses.
In CPS 4200.01 section 4.3, all steps are complete up to and including step 4.3.3.2 (completed by another Reactor Operator). Equipment control switches listed in CPS 4200.01 Appendix A for 4160V Bus 1A have been placed in PULL-TO-LOCK or LOCKED and verified.
In CPS 4200.01 section 4.3, all steps are complete up to and including step 4.3.3.2 (completed by another Reactor Operator). Equipment control switches listed in CPS 4200.01 Appendix A for 4160V Bus 1A have been placed in PULL
After 4160V Bus 1A has been re-energized, restoration actions will be performed by another Reactor Operator.
-TO-LOCK or LOCKED and verified.
Report to the CRS after completing the task.
After 4160V Bus 1A has been re
START TIME:
-energized, restoration actions will be performed by another Reactor Operator. Report to the CRS after completing the task.
Page 6 of 10
START TIME:


JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 7 of 10 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 4200.01 Loss of AC Power CPS 3501.01 High Voltage Auxiliary Power STEP ELEMENT STANDARD SAT UNSAT Comment Number *1 Prepares 4160V Bus 1A for re
PERFORMANCE STEPS CPS 4200.01 Loss of AC Power CPS 3501.01 High Voltage Auxiliary Power Comment SAT      UNSAT STEP                       ELEMENT                                     STANDARD Number
-energization.
*1           Prepares 4160V Bus 1A for re-energization.   *CPS 4200.01 step 4.3.3.3 On 1H13-P870-5012, examinee places the following control switches in PTL:
*CPS 4200.01 step 4.3.3.3 On 1H13-P870-5012, examinee places the following control switches in PTL:
* 4160V Bus 1A Mn Bkr 1A 1AP06EK
* 4160V Bus 1A Mn Bkr 1A 1AP06EK
* 4160V Bus 1A Res Bkr 1A 1AP06EM Cue: If asked about the availability of DC control power to 4160V Bus 1A, cue the examinee that DC control power was unaffected by the failure. CPS 4200.01 step 4.3.3.4 Examinee proceeds to CPS 3501.01 High Voltage Auxiliary Power System to re
* 4160V Bus 1A Res Bkr 1A 1AP06EM Cue: If asked about the availability of DC control power to 4160V Bus 1A, cue the examinee that DC control power was unaffected by the failure.
-energize 4160V Bus 1A.
CPS 4200.01 step 4.3.3.4 Examinee proceeds to CPS 3501.01 High Voltage Auxiliary Power System to re-energize 4160V Bus 1A.
CPS 3501.01 step 8.1.2.1 Examinee verifies that 4160V Bus 1A Mn Bkr 1A 1AP06EK and 4160V Bus 1A Res Bkr 1A 1AP06EM are in the Pull
CPS 3501.01 step 8.1.2.1 Examinee verifies that 4160V Bus 1A Mn Bkr 1A 1AP06EK and 4160V Bus 1A Res Bkr 1A 1AP06EM are in the Pull-To-Lock position (performed in CPS 4200.01 step 4.3.3.3 above).
-To-Lock position (performed in CPS 4200.01 step 4.3.3.3 above).
CPS 3501.01 step 8.1.2.2 On 1H13-P870-5012, examinee opens/verifies open (green light illuminated, red light extinguished) the following breakers:
CPS 3501.01 step 8.1.2.2 On 1H13-P870-5012, examinee opens/verifies open (green light illuminated, red light extinguished) the following breakers:
* 480V XFMR Q & I BKR, 1AP06EJ
* 480V XFMR Q & I BKR, 1AP06EJ
* 480V XFMR G & K BKR, 1AP06EQ CPS 3501.01 steps 8.1.2.3 & 8.1.2.4 Examinee verifies control switches for 4160V Bus 1A loads are in Pull-To-Lock or Lock/Stop
* 480V XFMR G & K BKR, 1AP06EQ CPS 3501.01 steps 8.1.2.3 & 8.1.2.4 Examinee verifies control switches for 4160V Bus 1A loads are in Pull-To-Lock or Lock/Stop.
. Evaluator note  
Evaluator note - no action is required by the examinee. This verification was noted as complete in the initiating cue.
- no action is required by the examinee. This verification was noted as complete in the initiating cue.
Page 7 of 10


JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 8 of 10 STEP ELEMENT STANDARD SAT UNSAT Comment Number *2 Re-energizes 4160V Bus 1A
Comment SAT      UNSAT STEP                   ELEMENT                                 STANDARD Number
*CPS 3501.01 step 8.1.2.5 On 1H13-P870-5012, examinee places 4160V Bus 1A Res Bkr Sync switch to ON.
  *2     Re-energizes 4160V Bus 1A               *CPS 3501.01 step 8.1.2.5 On 1H13-P870-5012, examinee places 4160V Bus 1A Res Bkr Sync switch to ON.
    *CPS 3501.01 step 8.1.2.6 On 1H13-P870-5012, examinee places 4160V Bus 1A Res Bkr 1AP06EM in CLOSE (red light illuminated and green light extinguished).
                                                  *CPS 3501.01 step 8.1.2.6 On 1H13-P870-5012, examinee places 4160V Bus 1A Res Bkr 1AP06EM in CLOSE (red light illuminated and green light extinguished).
CPS 3501.01 step 8.1.2.7 Examinee verifies 4160 Bus 1A energized by observing any/all of the following indications:
CPS 3501.01 step 8.1.2.7 Examinee verifies 4160 Bus 1A energized by observing any/all of the following indications:
* Bus energized red light
* Bus energized red light
* 4160 V Bus 1A Voltage Meter on P870
* 4160 V Bus 1A Voltage Meter on P870
* Annunciator 5012
* Annunciator 5012-1D AC Undervoltage 4160V Bus reset.
-1D AC Undervoltage 4160V Bus reset.
CPS 3501.01 step 8.1.2.8 On 1H13-P870-5012, examinee places 4160V Bus 1A Res Bkr Sync switch to OFF.
CPS 3501.01 step 8.1.2.8 On 1H13-P870-5012, examinee places 4160V Bus 1A Res Bkr Sync switch to OFF.
CPS 3501.01 step 8.1.2.9
CPS 3501.01 step 8.1.2.9 Examinee may place 4160V Bus 1A Mn Bkr, 1AP06EK C/S to AUTO.
Evaluator note - Examinee may N/A step 8.1.2.9 in anticipation of placing the plant in a normal shutdown alignment. If that occurs, is should not be considered a competency hit.
CPS 3501.01 step 8.1.2.10 Re-energize 480V Unit Subs No action required by examinee.
Cue - State that the JPM is complete.
TERMINATING CUES:
4160V Bus 1A is re-energized IAW CPS 4200.01 Loss of AC Power and CPS 3501.01 High Voltage Auxiliary Power System.
STOP TIME:
Page 8 of 10
 
JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
 
==Title:==
&#xa3; EO              &#xa3; RO                &#xa3; SRO            &#xa3; STA          &#xa3; SRO Cert JPM


Examinee may place 4160V Bus 1A Mn Bkr, 1AP06EK C/S to AUTO.
==Title:==
Evaluator note
Re-energize 4160V Bus 1A JPM Number:      JPM503                                                        Revision Number: 01 Task Number and
- Examinee may N
/A step 8.1.2.9 in anticipation of placing the plant in a normal shutdown alignment. If that occurs, is should not be considered a competency hit.
CPS 3501.01 step 8.1.2.10 Re
-energize 480V Unit Subs No action required by examinee. Cue - State that the JPM is complete.
TERMINATING CUES:
4160V Bus 1A is re
-energized IAW CPS 4200.01 Loss of AC Power and CPS 3501.01 High Voltage Auxiliary Power System.
STOP TIME: 


JPM Number:  JPM503  - rev 01  Clinton Power Station Job Performance Measure (JPM)
==Title:==
SRRS: 3D.105 (when utilized for operator initial or continuing training)
350101.17 Energize 4160V Bus 1A 1AP06E K/A System         K/A Number                     Importance (RO/SRO) 295003             AA1.01                     3.7                 3.8 Ability to operate and/or monitor the following as they apply to PARTIAL OR COMPLETE LOSS OF A.C. POWER: A.C. electrical distribution system.
Page 9 of 10 Operator's Name:
Suggested Testing Environment:                 Simulator Actual Testing Environment:               &#xa2; Simulator             &#xa3; Plant         &#xa3; Control Room Testing Method:         &#xa3; Simulate                     Alternate Path:       &#xa3; Yes       &#xa2; No
Job Title:
                          &#xa2; Perform                           SRO Only:       &#xa3; Yes       &#xa2; No Time Critical:       &#xa2; Yes           &#xa3; No Estimated Time to Complete:           15 minutes                 Actual Time Used:             minutes
&#xa3;  EO &#xa3;  RO &#xa3;  SRO &#xa3;  ST A &#xa3;  SRO Cert JPM Title:
Re-energize 4160V Bus 1A JPM Number:
JPM 503 Revision Number:
0 1 Task Number and Title:
350101.17 Energize 4160V Bus 1A 1AP06E K/A System K/A Number Importance (RO/SRO) 295003 AA1.01 3.7 3.8 Ability to operate and/or monitor the following as they apply to PARTIAL OR COMPLETE LOSS OF A.C. POWER: A.C. electrical distribution system.
Suggested Testing Environment:
Simulator Actual Testing Environment:
&#xa2;   Simulator &#xa3; Plant &#xa3; Control Room Testing Method:
&#xa3; Simulate Alternate Pat h: &#xa3; Yes &#xa2; No   &#xa2; Perform SRO Only: &#xa3; Yes &#xa2; No Time Critical:
&#xa2; Yes &#xa3; No Estimated Time to Complete:
15 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 2,392: Line 2,332:


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                 &#xa3; Yes       &#xa3; No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             &#xa3; Satisfactory             &#xa3; Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                            (Print)
&#xa3; Yes &#xa3; No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Signature:                                                              Date:
&#xa3; Satisfactory
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            Page 9 of 10
&#xa3; Unsatisfactory Comments:


Evaluator's Name:
(Print)
Evaluator's Signature:
Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 10 of 10  INITIAL CONDITIONS:
INITIAL CONDITIONS:
A scram has occurred.
A scram has occurred.
4160V Bus 1A failed to transfer to the reserve source due to a breaker failure.
4160V Bus 1A failed to transfer to the reserve source due to a breaker failure.
The breaker failure has been corrected.
The breaker failure has been corrected.
INITIATING CUE:
INITIATING CUE:
CAUTI ON &sect; All pre-job briefings are completed.
CAUTION
You are the 'B' RO.
              &sect;   All pre-job briefings are completed.
The CRS has directed you to re
You are the B RO.
-energize 4160V Bus 1A IAW CPS 4200.01 Loss of AC Power, section 4.3 Loss of Non
The CRS has directed you to re-energize 4160V Bus 1A IAW CPS 4200.01 Loss of AC Power, section 4.3 Loss of Non-ECCS Busses.
-ECCS Busses.
In CPS 4200.01 section 4.3, all steps are complete up to and including step 4.3.3.2 (completed by another Reactor Operator). Equipment control switches listed in CPS 4200.01 Appendix A for 4160V Bus 1A have been placed in PULL-TO-LOCK or LOCKED and verified.
In CPS 4200.01 section 4.3, all steps are complete up to and including step 4.3.3.2 (completed by another Reactor Operator).
After 4160V Bus 1A has been re-energized, restoration actions will be performed by another Reactor Operator.
Equipment control switches listed in CPS 4200.01 Appendix A for 4160V Bus 1A have been placed in PULL
Report to the CRS after completing the task.
-TO-LOCK or LOCKED and verified. After 4160V Bus 1A has been re
Page 10 of 10
-energized, restoration actions will be performed by another Reactor Operator. Report to the CRS after completing the task.


JPM427_R2 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure Restore ADS Air Supply To Normal Source JPM Number: JPM427 Revision Number: 0 2 Date: 8/29/16 Developed By:
CLINTON POWER STATION Job Performance Measure Restore ADS Air Supply To Normal Source JPM Number: JPM427 Revision Number: 02 Date: 8/29/16 Developed By:         T. Jennings                       8/29/16 Instructor                       Date Validated By:         Matt Baker                       10/25/16 SME or Instructor                 Date Reviewed By:         Jim Lucas                         11/15/16 Operations Representative         Date Approved By:         T. Jennings                       11/15/16 Training Department               Date JPM427_R2 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111
T. Jennings 8/29/16   Instructor Date Validated By:
 
Matt Baker 10/25/16   SME or Instructor Date Reviewed By:
JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Jim Lucas 11/15/16   Operations Representative Date Approved By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
T. Jennings 11/15/16   Training Department Date JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 2 of 13 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
(*).
Procedure CPS 3101.01 Rev: 23e Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 10. Verify performance time is accurate
Procedure CPS 3101.01               Rev: 23e Procedure                           Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Procedure                           Rev:
________     9. Verify cues both verbal and visual are free of conflict.
________     10. Verify performance time is accurate
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date Page 2 of 13


SME / Instructor Date SME / Instructor Date SME / Instructor Date JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 13 Revision Record (Summary)
Revision Record (Summary)
Revision Date Description 00 07/28/10 Update Procedure Revs, KAs and JPM number (31010107LSN02) 01 06/14/13 Updated to new template 02 8/29/16 Updated procedure references. Made editorial changes to the simulator setup instructions.
Revision   Date                             Description 00     07/28/10 Update Procedure Revs, KAs and JPM number (31010107LSN02) 01     06/14/13 Updated to new template 02     8/29/16 Updated procedure references. Made editorial changes to the simulator setup instructions.
Page 3 of 13


JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 4 of 13 Simulator Setup Instructions Simulator Setup
Simulator Setup Instructions Simulator Setup
: 1. Initialize to any suitable shutdown IC. 2. Place ADS Backup Air Bottles in service with 1IA012A & 13A open, and 1IA012B & 13B shut IAW 3101.01 Steps 8.2.4.1 through 8.2.4.2
: 1. Initialize to any suitable shutdown IC.
. 3. Save to a different IC if JPM is being used more than once.
: 2. Place ADS Backup Air Bottles in service with 1IA012A & 13A open, and 1IA012B & 13B shut IAW 3101.01 Steps 8.2.4.1 through 8.2.4.2.
IC-226 (PW 76319) is saved for the ILT 15
: 3. Save to a different IC if JPM is being used more than once. IC-226 (PW 76319) is saved for the ILT 15-1 NRC Exam.
-1 NRC Exam. JPM Administration
JPM Administration
: 1. Initialize to IC
: 1. Initialize to IC-226 (PW 76319).
-226 (PW 76319).
: 2. Open and execute Simulator Lesson Plan ILT 15-1 NRC Exam JPMs.
: 2. Open and execute Simulator Lesson Plan ILT 15-1 NRC Exam JPMs.
: 3. Release JPM 427 which will insert the following instructor overrides and malfunctions:
: 3. Release JPM427 which will insert the following instructor overrides and malfunctions:
* Fail 1PI-IA079 to 125 psig (0.5) on a 2 minute ramp when 1IA013A is shut.
* Fail 1PI-IA079 to 125 psig (0.5) on a 2 minute ramp when 1IA013A is shut.
* Fail 1PI-IA078 to 125 psig (0.5) on a 2 minute ramp when 1IA012A is shut.
* Fail 1PI-IA078 to 125 psig (0.5) on a 2 minute ramp when 1IA012A is shut.
* Delete the 1PI
* Delete the 1PI-IA079 (P601) instructor override when 1IA013A is reopened.
-IA079 (P601) instructor override when 1IA013A is reopened.
* Delete the 1PI-IA078 (P601) instructor override when 1IA012A is reopened.
* Delete the 1PI
* Bring in Annunciator 5040-6F when either 1PI-IA079 or 1PI-IA078 less than 150 psig (0.6).
-IA078 (P601) instructor override when 1IA012A is reopened.
* Clear Annunciator 5040-6F when both 1IA013A and 1IA012A open.
* Bring in Annunciator 5040
: 4. Prepare a (blank) administration copy of CPS 3101.01 MAIN STEAM (MS, IS & ADS) for candidate place-keeping.
-6F when either 1PI
: 5. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
-IA079 or 1PI
-IA078 less than 150 psig (0.6).
* Clear Annunciator 5040
-6F when both 1IA013A and 1IA012A open.
: 4. Prepare a (blank) administration copy of CPS 3101.01 MAIN STEAM (MS, IS & ADS) for candidate place
-keeping. 5. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
: 6. This completes the setup for this JPM.
: 6. This completes the setup for this JPM.
: 7. Freeze Simulator.
: 7. Freeze Simulator.
Page 4 of 13


JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 13  READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
TASK STANDARDS:
:
* ADS Backup Air Bottles are on service IAW CPS No. 3101.01 MAIN STEAM (MS, IS &
* ADS Backup Air Bottles are on service IAW CPS No. 3101.01 MAIN STEAM (MS, IS &
ADS) TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
ADS)
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
* CPS No. 3101.01, Rev 2 3e, MAIN STEAM (MS, IS & ADS)
* CPS No. 3101.01, Rev 23e, MAIN STEAM (MS, IS & ADS)
EVALUATOR INSTRUCTIONS:
EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
* All pre-job briefings are completed.
* Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
* Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
Page 5 of 13


JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 13  INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are the  
You are the B RO.
'B' RO. Due to a loss of IA , the ADS backup air bottles were placed in service. INITIATING CUE:
Due to a loss of IA, the ADS backup air bottles were placed in service.
CAUTION &sect; All pre-job briefings are completed.
INITIATING CUE:
CAUTION
              &sect;   All pre-job briefings are completed.
Instrument Air has been restored.
Instrument Air has been restored.
Return ADS to the normal air supply per 3101.01 Main Steam (MS, IS & ADS) step 8.2.4.5.
Return ADS to the normal air supply per 3101.01 Main Steam (MS, IS & ADS) step 8.2.4.5.
Report to the CRS after completing the task
Report to the CRS after completing the task.
. START TIME:
START TIME:
Page 6 of 13


JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 7 of 13 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS No. 3101.01 MAIN STEAM (MS, IS & ADS)
PERFORMANCE STEPS CPS No. 3101.01 MAIN STEAM (MS, IS & ADS)
*8.2.4.5.1 Place Control Switches for 1IA012A AND 1IA013A, ADS IA CNMT Outbd Isol Vlv to CLOSE.
      *8.2.4.5.1   Place Control Switches for 1IA012A AND 1IA013A, ADS IA CNMT Outbd Isol Vlv to CLOSE.
Standard: At 1H13-P800-50 41, examinee:
Standard:           At 1H13-P800-5041, examinee:
* locates the control switch for 1IA012A and rotates the switch counter clockwise to the CLOSE position and then verifies the Green light comes ON and the Red light goes OFF.
* locates the control switch for 1IA012A and rotates the switch counter clockwise to the CLOSE position and then verifies the Green light comes ON and the Red light goes OFF.
* locates the control switch for 1IA013A and rotates the switch counter clockwise to the CLOSE position and then verifies the Green light comes ON and the Red light goes OFF.
* locates the control switch for 1IA013A and rotates the switch counter clockwise to the CLOSE position and then verifies the Green light comes ON and the Red light goes OFF.
Cue: Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number
Cue:
  *8.2.4.5.2 Place Control Switches for 1IA012B AND 1IA013B, ADS IA CNMT Inbd Isol Vlv to OPEN.
Comments SAT &#xa3;             UNSAT &#xa3;                 Comment Number
Standard: At 1H13-P800-5041, examinee:
      *8.2.4.5.2   Place Control Switches for 1IA012B AND 1IA013B, ADS IA CNMT Inbd Isol Vlv to OPEN.
Standard:           At 1H13-P800-5041, examinee:
* locates the control switch for 1IA012B and rotates the switch clockwise to the OPEN position and then verifies the Red light comes ON and the Green light goes OFF.
* locates the control switch for 1IA012B and rotates the switch clockwise to the OPEN position and then verifies the Red light comes ON and the Green light goes OFF.
* locates the control switch for 1IA013B and rotates the switch clockwise to the OPEN position and then verifies the Red light comes ON and the Green light goes OFF. Cue:
* locates the control switch for 1IA013B and rotates the switch clockwise to the OPEN position and then verifies the Red light comes ON and the Green light goes OFF.
JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Cue:
Page 8 of 13 Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number 8.2.4.5.3 Return Control Switches for 1IA012A AND 1IA013A to AUTO.
Page 7 of 13
Standard: At 1H13-P800-5041, examinee:
 
JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Comments SAT &#xa3;             UNSAT &#xa3;               Comment Number 8.2.4.5.3 Return Control Switches for 1IA012A AND 1IA013A to AUTO.
Standard:       At 1H13-P800-5041, examinee:
* Locates the control switch for 1IA012A and rotates the switch clockwise to the AUTO position.
* Locates the control switch for 1IA012A and rotates the switch clockwise to the AUTO position.
* Locates the control switch for 1IA013A and rotates the switch clockwise to the AUTO position.
* Locates the control switch for 1IA013A and rotates the switch clockwise to the AUTO position.
Cue: Comments No valve movement will occur when the 1IA012A and 13A control switches are restored to AUTO.
Cue:
SAT   &#xa3; UNSAT   &#xa3; Comment Number 8.2.4.5.4 Verify ADS Air Hdr Pressure on 1H13
Comments       No valve movement will occur when the 1IA012A and 13A control switches are restored to AUTO.
-P601 (1PI-IA078 / 79) is 160  
SAT &#xa3;             UNSAT &#xa3;               Comment Number 8.2.4.5.4 Verify ADS Air Hdr Pressure on 1H13-P601 (1PI-IA078 / 79) is 160 - 170 psig.
- 170 psig. Standard: Locates 1PI
Standard:       Locates 1PI-IA078 / 79 on 1H13-P601-5067 and determines air pressure is less than 160 psig.
-IA078 / 79 on 1H13
Cue:           If the examinee requests an Equipment Operator to check air amplifier operation, cue him/her that the Containment is not accessible.
-P601-5067 and determines air pressure is less than 160 psig. Cue: If the examinee requests an Equipment Operator to check air amplifier operation, cue him/her that the Containment is not accessible.
Comments SAT &#xa3;             UNSAT &#xa3;               Comment Number Page 8 of 13
Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number


JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 9 of 13 ALTERNATE PATH BEGINS HERE Annunciator 5040
ALTERNATE PATH BEGINS HERE Annunciator 5040-6F High/Low Press ADS IA Supply Div 1 or 2.
-6F High/Low Press ADS IA Supply Div 1 or 2.
Alternate Path Responds to Annunciator 5040-6F High/Low Press ADS IA Supply Div 1 or 2.
Alternate Path Step 1 Responds to Annunciator 5040
Step 1 OPERATOR ACTIONS
-6F High/Low Press ADS IA Supply Div 1 or 2.
: 4. As appropriate, shift to ADS Backup Air Bottles or Normal IA Standard:       Examinee refers to Annunciator Response Procedure 5040-6F and determines that Operator Action 4 applies.
OPERATOR ACTIONS
Cue:           If the examinee reports receipt of annunciator 5040-6F, acknowledge the report.
: 4. As appropriate, shift to 'ADS Backup Air Bottles' or 'Normal IA' Standard: Examinee refers to Annunciator Response Procedure 5040
Comments SAT &#xa3;               UNSAT &#xa3;               Comment Number CPS No. 3101.01 MAIN STEAM (MS, IS & ADS)
-6F and determines that Operator Action 4 applies.
* Alternate  Shut 1IA012B, ADS IA CNMT Inbd Isol Vlv. Verify 1IA012A, ADS IA Path Step 2  CNMT Outbd Isol Vlv opens.
Cue: If the examinee reports receipt of annunciator 5040
      *8.2.4.1 Standard:
-6F, acknowledge the report.
* Examinee locates the control switch for 1IA012B ADS IA CNMT Inbd Isol Vlv on 1H13-P800-5041, rotates the switch counter clockwise and then verifies the Green light comes ON and the Red light goes OFF.
Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number CPS No. 3101.01 MAIN STEAM (MS, IS & ADS)
* Examinee locates the control switch for 1IA012A and verifies the Red light comes ON and the Green light goes OFF.
* Alternate Path Step 2
Cue:
  *8.2.4.1 Shut 1IA012B, ADS IA CNMT Inbd Isol Vlv.
Comments       Closing 1IA012B is the only portion of the step that is critical.
Verify 1IA012A, ADS IA CNMT Outbd Isol Vlv opens. Standard:
SAT &#xa3;               UNSAT &#xa3;               Comment Number Page 9 of 13
* Examinee locates the control switch for 1IA01 2B ADS IA CNMT Inbd Isol Vlv on 1H13
-P800-5041, rotates the switch counter clockwise and then verifies the Green light comes ON and the Red light goes OFF.
* Examinee locates the control switch for 1IA012A and verifies the Red light comes ON and the Green light goes OFF. Cue: Comments Closing 1IA012B is the only portion of the step that is critical.
SAT   &#xa3; UNSAT   &#xa3; Comment Number


JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 10 of 13
* Alternate Shut 1IA013B, ADS IA CNMT Inbd Isol Vlv. Verify 1IA013A, ADS IA Path Step 3 CNMT Outbd Isol Vlvs opens.
* Alternate Path Step 3 8.2.4.2 Shut 1IA013B, ADS IA CNMT Inbd Isol Vlv.
8.2.4.2 Standard:
Verify 1IA013A, ADS IA CNMT Outbd Isol Vlvs opens.
* Examinee locates the control switch for 1IA013B ADS IA CNMT Inbd Isol Vlv on 1H13-P800-5041, rotates the switch counter clockwise and then verifies the Green light comes ON and the Red light goes OFF.
* Examinee locates the control switch for 1IA013A and verifies the Red light comes ON and the Green light goes OFF.
Cue:
Comments        Closing 1IA013B is the only portion of the step that is critical.
SAT &#xa3;              UNSAT &#xa3;              Comment Number JPM Step 8  Verify (1H13-P601, 5067):
8.2.4.3      o ADS Instrument Air Hdr Pressure, 1PI-IA078/79 > 147.5 psig.
o ADS Backup Air Hdr Pressure, 1PI-IA080/81 > 2300 psig.
Standard:
Standard:
* Examinee locates the control switch for 1IA01 3B ADS IA CNMT Inbd Isol Vlv on 1H13
* Examinee locates 1PI-IA078 / 79 on 1H13-P601-5067 and determines Instrument Air Header Pressure is > 147.5 psig.
-P800-5041, rotates the switch counter clockwise and then verifies the Green light comes ON and the Red light goes OFF.
* Examinee locates 1PI-IA080 / 81 on 1H13-P601-5067 and determines Backup Air Header Pressure is > 2300 psig.
* Examinee locates the control switch for 1IA01 3 A and verifies the Red light comes ON and the Green light goes OFF. Cue:  Comments Closing 1IA013B is the only portion of the step that is critical.
Cue:           If the examinee reports that the ADS Backup Air Bottles have been placed on service, acknowledge the report.
SAT  &#xa3; UNSAT  &#xa3; Comment Number JPM Step 8 8.2.4.3 Verify (1H13
Comments SAT &#xa3;               UNSAT &#xa3;               Comment Number Page 10 of 13
-P601, 5067):
 
o ADS Instrument Air Hdr Pressure, 1PI
JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
-IA078/79 > 147.5 psig.
TERMINATING CUES:
o ADS Backup Air Hdr Pressure, 1PI
ADS Backup Air Bottles have been placed in service IAW CPS No. 3101.01 Main Steam (MS, IS, &
-IA080/81 > 2300 psig.
ADS) section 8.2.4 Placing ADS Backup Air Bottles On Service.
Standard:
STOP TIME:
* Examinee locates 1PI
Page 11 of 13
-IA078 / 79 on 1H13-P601-5067 and determines Instrument Air Header Pressure is  
 
> 147.5 psig.
JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
* Examinee locates 1PI
Operators Name:
-IA080 / 81 on 1H13
Job
-P601-5067 and determines Backup Air Header Pressure is > 2300 psig.
 
Cue: If the examinee reports that the ADS Backup Air Bottles have been placed on service, acknowledge the report.
==Title:==
Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number
&#xa3; EO              &#xa3; RO                &#xa3; SRO            &#xa3; STA          &#xa3; SRO Cert JPM


JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
==Title:==
Page 11 of 13 TERMINATING CUES:
Restore ADS Air Supply To Normal Source JPM Number:     JPM427                                                       Revision Number: 02 Task Number and
ADS Backup Air Bottles have been placed in service IAW CPS No. 3101.01 Main Steam (MS, IS, & ADS) section 8.2.4 Placing ADS Backup Air Bottles On Service.
STOP TIME: 


JPM Number:  JPM427 - Rev 02  Clinton Power Station Job Performance Measure (JPM)
==Title:==
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 12 of 13 Operator's Name:
Job Title:
&#xa3;  E O &#xa3;  RO &#xa3;  SRO &#xa3;  STA &#xa3;  SRO Cert JPM Title:
Restore ADS Air Supply To Normal Source JPM Number:
JPM 427 Revision Number:
0 2 Task Number and Title:
310101.08 Complete control room actions to perform placing ADS backup air bottles in service.
310101.08 Complete control room actions to perform placing ADS backup air bottles in service.
K/A System K/A Number Importance (RO/SRO) 300000 A4.01 2.6 2.7 Ability to manually operate and/or monitor in the control room: Pressure gauges Suggested Testing Environment:
K/A System         K/A Number                     Importance (RO/SRO) 300000               A4.01                     2.6                 2.7 Ability to manually operate and/or monitor in the control room:
Simulator Actual Testing Environment:
Pressure gauges Suggested Testing Environment:                 Simulator Actual Testing Environment:               &#xa2; Simulator             &#xa3; Plant         &#xa3; Control Room Testing Method:         &#xa3; Simulate                     Alternate Path:       &#xa2; Yes       &#xa3; No
&#xa2;   Simulator &#xa3; Plant &#xa3; Control Room Testing Method
                          &#xa2; Perform                           SRO Only:       &#xa3; Yes       &#xa2; No Time Critical:       &#xa3; Yes           &#xa2; No Estimated Time to Complete:           15 minutes                 Actual Time Used:             minutes
: &#xa3; Simulate Alternate Path:
&#xa2; Yes &#xa3; No   &#xa2; Perform SRO Only: &#xa3; Yes &#xa2; No Time Critical:
&#xa3; Yes &#xa2; No Estimated Time to Complete:
1 5 minutes Actual Time Used:
minutes  


==References:==
==References:==
* CPS No. 3101.01, Rev 2 3e MAIN STEAM (MS, IS & ADS)
* CPS No. 3101.01, Rev 23e MAIN STEAM (MS, IS & ADS)
* CPS 5040.06 (6F) HIGH/LOW PRESS ADS IA SUPPLY DIV 1 OR 2, Rev. 28b EVALUATION  
* CPS 5040.06 (6F) HIGH/LOW PRESS ADS IA SUPPLY DIV 1 OR 2, Rev. 28b EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                 &#xa3; Yes       &#xa3; No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             &#xa3; Satisfactory             &#xa3; Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                              (Print)
&#xa3; Yes &#xa3; No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Signature:                                                              Date:
&#xa3; Satisfactory
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            Page 12 of 13
&#xa3; Unsatisfactory Comments:


Evaluator's Name:
(Print)
Evaluator's Signature:
Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 13 of 13  INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are the 'B' RO.
You are the B RO.
Due to a loss of IA, the ADS backup air bottles were placed in service.
Due to a loss of IA, the ADS backup air bottles were placed in service.
INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.
CAUTION
              &sect;   All pre-job briefings are completed.
Instrument Air has been restored.
Instrument Air has been restored.
Return ADS to the normal air supply per 3101.01 Main Steam (MS, IS & ADS) step 8.2.4.5.
Return ADS to the normal air supply per 3101.01 Main Steam (MS, IS & ADS) step 8.2.4.5.
Report to the CRS after completing the task.
Report to the CRS after completing the task.
Page 13 of 13
CLINTON POWER STATION Job Performance Measure VF Trip During Swap of VC Trains (Alternate Path)
JPM Number: JPM474 Revision Number: 00 Date: 9/14/16 Developed By:          T. Jennings                        9/14/16 Instructor                        Date Validated By:        Michael Antonelli                  10/25/16 SME or Instructor                  Date Reviewed By:          Jim Lucas                          11/15/16 Operations Representative          Date Approved By:          T. Jennings                        11/15/16 Training Department                Date JPM474_R0 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111


JPM474_R0 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure VF Trip During Swap of VC Trains (Alternate Path)
JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number:  JPM47 4 Revision Number: 0 0 Date: 9/14/16  Developed By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
T. Jennings 9/14/16  Instructor Date  Validated By:
Michael Antonelli 10/25/16  SME or Instructor Date  Reviewed By:
Jim Lucas  11/15/16  Operations Representative Date  Approved By:
T. Jennings 11/15/16  Training Department Date JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 2 of 14 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
(*).
Procedure CPS 3402.01P001 Rev: 6 b  Procedure CPS 3319.01 Rev: 17 Procedure CPS 3404.01 Rev: 13e ________ 9. Verify cues both verbal and visual are free of conflict.
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 10. Verify performance time is accurate
Procedure CPS 3402.01P001           Rev: 6b Procedure CPS 3319.01               Rev:17 Procedure CPS 3404.01               Rev:13e
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________     9. Verify cues both verbal and visual are free of conflict.
________     10. Verify performance time is accurate
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date Page 2 of 14


SME / Instructor Date SME / Instructor Date SME / Instructor Date JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 14 Revision Record (Summary)
Revision Record (Summary)
Revisi on Date Description 00 9/14/16 New JPM.
Revision  Date                           Description 00     9/14/16 New JPM.
JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 14
Page 4 of 14 Simulator Setup Instructions
 
: 1. IC Setup a. Reset the simulator to any shutdown or at power IC with VC Train 'A' in service and VC Train 'B' secured. b. Insert Remote Function VC10VC_CHILLERATCC OFF to secure VC Chiller 'A'.
JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions
: 1. IC Setup
: a. Reset the simulator to any shutdown or at power IC with VC Train A in service and VC Train B secured.
: b. Insert Remote Function VC10VC_CHILLERATCC OFF to secure VC Chiller A.
: c. Ensure plant is stable and then save to a different IC if JPM is being used more than once.
: c. Ensure plant is stable and then save to a different IC if JPM is being used more than once.
IC-225 (pw: 76319) is saved for the ILT 15
IC-225 (pw: 76319) is saved for the ILT 15-1 NRC Exam.
-1 NRC Exam.
: 2. JPM Setup
: 2. JPM Setup a. Reset the simulator to the IC saved in Section 1 above. b. Open and execute Simulator Lesson Plan ILT 15-1 NRC Exam JPMs.
: a. Reset the simulator to the IC saved in Section 1 above.
: c. Release JPM474 which will trigger the following when the 0VC03CB Cont Rm Sply Fan is started: 1) A12_A06_DS164_1 OFF (1VF06Y/7Y Green Light Off)
: b. Open and execute Simulator Lesson Plan ILT 15-1 NRC Exam JPMs.
: 2) A12_A06_DS142_1 ON (1VF07Y Green Light On)
: c. Release JPM474 which will trigger the following when the 0VC03CB Cont Rm Sply Fan is started:
: 3) A12_A05_S24 OFF (VF Exhaust Fans Off
: 1)   A12_A06_DS164_1 OFF (1VF06Y/7Y Green Light Off)
) 4) A12_A05_DS124_1 ON (1VF04CA/B Amber Light On)
: 2)   A12_A06_DS142_1 ON (1VF07Y Green Light On)
: 5) A12_A05_DS70_1 OFF (1VF03CA/B Red Light Off)
: 3)   A12_A05_S24 OFF (VF Exhaust Fans Off)
: 6) A12_A05_DS68_1 ON (1VF03CA/B Amber Light On)
: 4)   A12_A05_DS124_1 ON (1VF04CA/B Amber Light On)
: 7) A12_A05_DS69_1 ON (1VF03CA/B Green Light O n) d. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
: 5)   A12_A05_DS70_1 OFF (1VF03CA/B Red Light Off)
: 6)   A12_A05_DS68_1 ON (1VF03CA/B Amber Light On)
: 7)   A12_A05_DS69_1 ON (1VF03CA/B Green Light On)
: d. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
: e. This completes the setup for this JPM.
: e. This completes the setup for this JPM.
Page 4 of 14


JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 14 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
TASK STANDARDS:
:
* Examinee has successfully placed one of the two Standby Gas Treatment Trains in service to restore secondary containment differential pressure.
* Examinee has successfully placed one of the two Standby Gas Treatment Trains in service to restore secondary containment differential pressure.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
Line 2,657: Line 2,590:


==REFERENCES:==
==REFERENCES:==
* CPS 3 402.01P001, Rev 6 b CONTROL ROOM HVAC (VC) TRAIN SHIFTING
* CPS 3402.01P001, Rev 6b CONTROL ROOM HVAC (VC) TRAIN SHIFTING
* CPS 5042.05 (5D), Rev 31a ALARM PANEL 5042 ANNUNCIATORS  
* CPS 5042.05 (5D), Rev 31a ALARM PANEL 5042 ANNUNCIATORS - ROW 5
- ROW 5
* CPS 3319.01, Rev. 17 STANDBY GAS TREATMENT (VG)
* CPS 3319.01, Rev. 17 STANDBY GAS TREATMENT (VG)
* CPS 3404.01, Rev. 13e FUEL BUILDING HVAC (VF)
* CPS 3404.01, Rev. 13e FUEL BUILDING HVAC (VF)
EVALUATOR INSTRUCTIONS:
EVALUATOR INSTRUCTIONS:
* This JPM was developed from events detailed in LER 2014
* This JPM was developed from events detailed in LER 2014-001-00 Premature Failure Of Air Supply Solenoid Results in Isolation of Fuel Building Ventilation System and Loss of Secondary Containment Pressure.
-001-00 Premature Failure Of Air Supply Solenoid Results in Isolation of Fuel Building Ventilation System and Loss of Secondary Containment Pressure.
* During performance of this JPM, when 0VC03CB Main Control Room Ventilation (VC)
* During performance of this JPM, when 0VC03CB Main Control Room Ventilation (VC) System 'B' Supply fan is started, the resultant voltage transient will result in a trip of the Fuel Building Supply and Exhaust Fans and high differential pressure in the Secondary Containment. These conditions will require the examinee to pursue the alternate path task to start one of the two Standby Gas Treatment (VG) Trains to restore Secondary Containment differential pressure.
System B Supply fan is started, the resultant voltage transient will result in a trip of the Fuel Building Supply and Exhaust Fans and high differential pressure in the Secondary Containment. These conditions will require the examinee to pursue the alternate path task to start one of the two Standby Gas Treatment (VG) Trains to restore Secondary Containment differential pressure.
* Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
* Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
* Provide the examinee with a marked up copy of CPS 3402.01P001, CONTROL ROOM HVAC (VC) TRAIN SHIFTING with the cue sheet ONLY. Do NOT provide copies of CP S 3319.01 or CPS 3404.01 until prompted to do so after JPM step 3 and step 4.
* Provide the examinee with a marked up copy of CPS 3402.01P001, CONTROL ROOM HVAC (VC) TRAIN SHIFTING with the cue sheet ONLY. Do NOT provide copies of CPS 3319.01 or CPS 3404.01 until prompted to do so after JPM step 3 and step 4.
* Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
* All pre-job briefings are completed.
Page 5 of 14


JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 14  INITIAL CONDITIONS:
INITIAL CONDITIONS:
Main Control Room Ventilation (VC) Train 'A' is in
Main Control Room Ventilation (VC) Train A is in-service.
-service. INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.
CAUTION
The CRS has directed you to shift Control Room HVAC (VC) trains to 'B' in service and 'A' secured in accordance with CPS 3402.01P001 CONTROL ROOM HVAC (VC) TRAIN SHIFTING starting at step  
                &sect;   All pre-job briefings are completed.
 
The CRS has directed you to shift Control Room HVAC (VC) trains to B in service and A secured in accordance with CPS 3402.01P001 CONTROL ROOM HVAC (VC) TRAIN SHIFTING starting at step 8.1.7.4.2.
8.1.7.4.2. The following steps have already been completed:
The following steps have already been completed:
* 8.1.7.1 - 8.1.7.3 (all steps)
* 8.1.7.1 - 8.1.7.3 (all steps)
* 8.1.7.4.1
* 8.1.7.4.1
* 8.1.7.5.1  
* 8.1.7.5.1 - 8.1.7.5.6
- 8.1.7.5.6
* 8.1.7.6.1 - 8.1.7.6.6 Report to the CRS when the task has been completed.
* 8.1.7.6.1  
START TIME:
- 8.1.7.6.6 Report to the CRS when the task has been completed.
Page 6 of 14
START TIME:


JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 7 of 14 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 3 402.01P001 , Control Room HVAC (VC) Train Shifting Section 8.
PERFORMANCE STEPS CPS 3402.01P001, Control Room HVAC (VC) Train Shifting Section 8.1.7.4 Comment SAT      UNSAT STEP                       ELEMENT                               STANDARD Number
1.7.4 STEP ELEMENT STANDARD SAT UNSAT Comment Number *1      
*1           Secures VC Ventilation Train A.      8.1.7.4.2 On panel 1H13-P801-5050, examinee shuts 0VC69Y Locker Rm Exh Fan 11C Isol Dmpr.
8.1.7.4.3 On panel 1H13-P801-5052, examinee shuts 0VC70Y Locker Rm Exh Fan 11C Isol Dmpr.
8.1.7.4.4 On panel 1H13-P801-5050, examinee verifies 0VC11C Cont Rm Locker Rm Exhaust Fan not running (green light illuminated, red light extinguished).
8.1.7.4.5 On panel 1H13-P801-5050, examinee either secures or leaves running Cont Rm HVAC Eq Rm Sply Fan 0VC18CA.
Cue: If asked, cue the examinee to leave 0VC18CA running.
8.1.7.4.6 Examinee verifies CPS 3402.01P001 section 8.1.7.3 Chiller Shutdown is complete.
                                                      *8.1.4.7 On panel 1H13-P801-5050, examinee secures 0VC03CA, Cont Rm Trn A Supply Fan.
Page 7 of 14


Secures VC Ventilation Train '
JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
A'. 8.1.7.4.2 On panel 1H13
Comment SAT      UNSAT STEP                      ELEMENT                                STANDARD Number
-P801-5050, examinee shuts 0VC69Y Locker Rm Exh Fan 11C Isol Dmpr. 8.1.7.4.3 On panel 1H13
    *1                                                8.1.7.4.8 (contd)
-P801-5052, examinee shuts 0VC70Y Locker Rm Exh Fan 11C Isol Dmpr. 8.1.7.4.4 On panel 1H13
On 1H13-P801-5050, examinee verifies the following VC A Ventilation components automatically realign:
-P801-5050, examinee verifies 0VC11C Cont Rm Locker Rm Exhaust Fan not running (green light illuminated, red light extinguished)
0VC03YA damper shuts 0VC115YA damper shuts 0VC04CA, Cont Rm Rtrn Fan stops 0VC08YA damper shuts 0VC08PA, Cont Rm Ch Wtr Pump A stops 0VC21YA damper shuts 0VC24YA damper shuts 0VC27YA damper shuts 0VC30YA damper shuts 0VC33YA damper shuts 0VC36YA damper shuts 0VC39YA damper shuts 0VC04YA damper shuts
. 8.1.7.4.5 On panel 1H13
*2          Starts VC Ventilation Train B.         8.1.7.5.7 On 1H13-P801-5050 and 5052, examinee verifies 0VC01YA, Cont Rm Trn A Min OS Air Dmpr and 0VC01YB, Cont Rm Trn B Min OS Air Dmpr are open (red light illuminated, green light extinguished)
-P801-5050, examinee either secures or leaves running Cont Rm HVAC Eq Rm Sply Fan 0VC18CA.
                                                      *8.1.7.5.8 On 1H13-P801-5052, examinee starts 0VC03CB, Cont Rm Trn B Supply Fan (red light illuminated, green light extinguished).
Cue: If asked, cue the examinee to leave 0VC18CA running
Begin Alternate Path CPS 5042-5D High Diff Press Fuel Bldg Page 8 of 14
. 8.1.7.4.6 Examinee verifies CPS 3402.01P001 section 8.1.7.3 Chiller Shutdown is complete.    *8.1.4.7 On panel 1H13
-P801-5050, examinee secures 0VC03CA, Cont Rm Trn A Supply Fan.


JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 8 of 14 STEP ELEMENT STANDARD SAT UNSAT Comment Number *1 (cont'd)  8.1.7.4.8 On 1H13-P801-5050, examinee verifies the following VC 'A' Ventilation components automatically realign:
Comment SAT     UNSAT STEP                 ELEMENT                                     STANDARD Number 3         Responds to High Differential Pressure in   Operator Action 1 the Fuel Building (Secondary Containment Dispatches an operator to local panel 1PL44J to determine cause of the high differential pressure condition.
&#xff; 0VC03YA damper shuts &#xff; 0VC115YA damper shuts &#xff; 0VC04CA, Cont Rm Rtrn Fan stops
Cue: If the examinee does not respond to 1H13-P800-5042 alarms, cue him/her to report 1H13-P800 alarms and take appropriate actions.
&#xff; 0VC08YA damper shuts &#xff; 0VC08PA, Cont Rm Ch Wtr Pump A stops &#xff; 0VC21YA damper shuts &#xff; 0VC24YA damper shuts &#xff; 0VC27YA damper shuts &#xff; 0VC30YA damper shuts &#xff; 0VC33YA damper shuts &#xff; 0VC36YA damper shuts &#xff; 0VC39YA damper shuts &#xff; 0VC04YA damper shuts    *2 Starts VC Ventilation Train 'B'.
8.1.7.5.7 On 1H13-P801-5050 and 5052, examinee verifies 0VC01YA, Cont Rm Trn A Min OS Air Dmpr and 0VC01YB, Cont Rm Trn B Min OS Air Dmpr are open (red light illuminated, green light extinguished)
    *8.1.7.5.8 On 1H13-P801-5052, examinee starts 0VC03CB, Cont Rm Trn B Supply Fan (red light illuminated, green light extinguished).
Begin Alternate Path CPS 5042-5D High Diff Press Fuel Bldg JPM Number:  JPM474  - rev 00  Clinton Power Station Job Performance Measure (JPM)
Page 9 of 14 STEP ELEMENT STANDARD SAT UNSAT Comment Number 3 Responds to High Differential Pressure in the Fuel Building (Secondary Containment Operator Action 1 Dispatches an operator to local panel 1PL44J to determine cause of the high differential pressure condition
. Cue: If the examinee does not respond to 1H13-P800-5042 alarms, cue him/her to report 1H13
-P800 alarms and take appropriate actions.
Cue: when examinee reports trip of the Fuel Building Ventilation System to the CRS, acknowledge the report and direct the examinee to respond to annunciators as appropriate.
Cue: when examinee reports trip of the Fuel Building Ventilation System to the CRS, acknowledge the report and direct the examinee to respond to annunciators as appropriate.
Cue: (when asked to investigate local panel alarm), acknowledge the order and state, "I am on my way to the panel to investigate".
Cue: (when asked to investigate local panel alarm), acknowledge the order and state, I am on my way to the panel to investigate.
Operator Action 3 Starts the Standby Gas Treatment System.
Operator Action 3 Starts the Standby Gas Treatment System.
Cue - If the examinee reports to the CRS that 5042-5D references ITS LCO 3.6.4.1 and may be reportable per SAF 1.8, acknowledge the report and state that you will refer to Technical Specifications and the Reportability Manual.
Cue - If the examinee reports to the CRS that 5042-5D references ITS LCO 3.6.4.1 and may be reportable per SAF 1.8, acknowledge the report and state that you will refer to Technical Specifications and the Reportability Manual.
CPS 3319.01 STANDBY GAS TREATMENT (VG) (Provide copy to the examinee) (hard card use is acceptable) 4           Makes preparations for starting one of the two Standby Gas Treatment System trains.
CPS 3319.01 STANDBY GAS TREATMENT (VG) (Provide copy to the examinee) (hard card use is acceptable) 4         Makes preparations for starting one of the   8.2.1.1 two Standby Gas Treatment System trains.
8.2.1.1  Verify/secure all diesel exhaust sources (i.e., truck engines in the Fuel Bldg) which have the potential of being drawn into VG charcoal beds.
Verify/secure all diesel exhaust sources (i.e., truck engines in the Fuel Bldg) which have the potential of being drawn into VG charcoal beds.
Cue - If asked about diesel exhaust sources in the Fuel Building, cue the examinee that there are no diesel exhaust sources in the Fuel Building.
Cue - If asked about diesel exhaust sources in the Fuel Building, cue the examinee that there are no diesel exhaust sources in the Fuel Building.
8.2.1.2 Examinee verifies either 0RIX
8.2.1.2 Examinee verifies either 0RIX-PR003 or PR004, SGTS Stack PRM in-service and operable.
-PR003 or PR004, SGTS Stack PRM in
Cue - If asked about the operability status of 0RIX-PR003 and/or PR004, state that both monitors are operable.
-service and operable. Cue - If asked about the operability status of 0RIX-PR003 and/or PR004, state that both monitors are operable.
Page 9 of 14


JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 10 of 14 STEP ELEMENT STANDARD SAT UNSAT Comment Number *4 (cont'd) 8.2.1.3 Examinee notifies RP that VG will be manually started.
Comment SAT      UNSAT STEP                 ELEMENT                                     STANDARD Number 8.2.1.3
Cue - When examinee reports that VG will be manually started, acknowledge the report. 8.2.1.4 Notifies Chemistry after SGTS flow is initiated to perform sampling per CPS 9940.01, Weekly Chemistry Surveillance Log. Cue - when the examinee requests Chemistry to perform sampling per CPS 9940.01 acknowledge the order.
*4 (contd)                                                Examinee notifies RP that VG will be manually started.
8.2.1.5 Examinee monitor s Secondary Containment pressure using Secondary CNMT DP (Div 1  
Cue - When examinee reports that VG will be manually started, acknowledge the report.
- 5050) or Secondary CNMT DP (Div 2  
8.2.1.4 Notifies Chemistry after SGTS flow is initiated to perform sampling per CPS 9940.01, Weekly Chemistry Surveillance Log.
- 5052) on 1H13
Cue - when the examinee requests Chemistry to perform sampling per CPS 9940.01 acknowledge the order.
-P801 as needed through the remainder of this section. 8.2.1.6 Examinee performs manual shutdown and isolation of VF using CPS 3404.01, Fuel Building HVAC (VF) to prevent tripping on high differential pressure.
8.2.1.5 Examinee monitors Secondary Containment pressure using Secondary CNMT DP (Div 1 - 5050) or Secondary CNMT DP (Div 2 - 5052) on 1H13-P801 as needed through the remainder of this section.
CPS 3404.01 Fuel Building HVAC (VF)
8.2.1.6 Examinee performs manual shutdown and isolation of VF using CPS 3404.01, Fuel Building HVAC (VF) to prevent tripping on high differential pressure.
(Provide copy to the examinee) 5 Performs manual shutdown and isolation of VF. 8.3.1.1 Notifies RP of pending VF system shutdown. Cue - when the examinee reports pending VF system shutdown, acknowledge the report. 8.3.1.2 Examinee directs equipment operator to turn Heater 1VF02A H/S to OFF.
CPS 3404.01 Fuel Building HVAC (VF) (Provide copy to the examinee) 5           Performs manual shutdown and isolation of   8.3.1.1 VF.
Notifies RP of pending VF system shutdown.
Cue - when the examinee reports pending VF system shutdown, acknowledge the report.
8.3.1.2 Examinee directs equipment operator to turn Heater 1VF02A H/S to OFF.
Cue - as the Area Operator, report that the 1VF02A handswitch was already off.
Cue - as the Area Operator, report that the 1VF02A handswitch was already off.
Page 10 of 14


JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 11 of 14 STEP ELEMENT STANDARD SAT UNSAT Comment Number 5 (cont'd) 8.3.1.3 - 8.3.1.7 Examinee directs equipment operator to perform local panel 1PL44J shutdown actions for the Fuel Building Ventilation System. Cue - as the Area Operator, report that steps CPS 3404.01 steps 8.3.1.3  
Comment SAT      UNSAT STEP               ELEMENT                           STANDARD Number 8.3.1.3 - 8.3.1.7 5 (contd)
- 8.3.1.7 are complete.
Examinee directs equipment operator to perform local panel 1PL44J shutdown actions for the Fuel Building Ventilation System.
Cue - as the Area Operator, report that steps CPS 3404.01 steps 8.3.1.3 - 8.3.1.7 are complete.
8.3.1.8 On 1H13-P801-5050, examinee closes 1VF04Y/9Y Fuel Bldg Sply Outbd Isol Dmprs (green lights illuminated, red lights extinguished).
8.3.1.8 On 1H13-P801-5050, examinee closes 1VF04Y/9Y Fuel Bldg Sply Outbd Isol Dmprs (green lights illuminated, red lights extinguished).
8.3.1.9 On 1H13-P801-505 2, examinee closes 1VF06Y/7Y Fuel Bldg Sply Inbd Isol Dmprs (green lights illuminated, red lights extinguished).
8.3.1.9 On 1H13-P801-5052, examinee closes 1VF06Y/7Y Fuel Bldg Sply Inbd Isol Dmprs (green lights illuminated, red lights extinguished).
8.3.1.10 If desired, place 1RIX
8.3.1.10 If desired, place 1RIX-PR019, Fuel Bldg CAM (EOP-8 Monitor) in STANDBY per CPS 3315.03 (AR/PR).
-PR019, Fuel Bldg CAM (EOP-8 Monitor) in STANDBY per CPS 3315.03 (AR/PR).
Cue - as the CRS, state that another operator will place 1RIX-PR019 in standby and to proceed with placing Standby Gas Treatment in service.
Cue - as the CRS, state that another operator will place 1RIX
-PR019 in standby and to proceed with placing Standby Gas Treatment in service.
CPS 3319.01 STANDBY GAS TREATMENT (VG)
CPS 3319.01 STANDBY GAS TREATMENT (VG)
Page 11 of 14


JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 12 of 14 STEP ELEMENT STANDARD SAT UNSAT Comment Number *6 Manually initiates either train of the Standby Gas Treatment System.
Comment SAT      UNSAT STEP                   ELEMENT                                 STANDARD Number
*8.2.1.7 On 1H13-P801-5050 or 5052, the examinee place s the selected SGTS train in service by starting SGTS Trn A(B) Exh Fan, 0VG02CA(B), and then performs the following verifications:
*6       Manually initiates either train of the   *8.2.1.7 Standby Gas Treatment System.
&#xff; 1VG17YA(B) Closes
On 1H13-P801-5050 or 5052, the examinee places the selected SGTS train in service by starting SGTS Trn A(B) Exh Fan, 0VG02CA(B), and then performs the following verifications:
&#xff; 1VG16YA(B) Closes
1VG17YA(B) Closes 1VG16YA(B) Closes 1VG04YA(B) Opens 1VG05YA(B) Opens 1VG06YA(B) Opens 1VG02YA(B) Opens 0VG01YA(B) Opens (modulates) 0VG04AA(B) Energizes 0VG02YA(B) Opens 0VG05YA(B) Opens 0VG03CA(B) Stops (if running) 0VG05CA(B) Starts (local indication)
&#xff; 1VG04YA(B) Opens
&#xff; 1VG05YA(B) Opens
&#xff; 1VG06YA(B) Opens
&#xff; 1VG02YA(B) Opens
&#xff; 0VG01YA(B) Opens (modulates)
&#xff; 0VG04AA(B) Energizes
&#xff; 0VG02YA(B) Opens
&#xff; 0VG05YA(B) Opens
&#xff; 0VG03CA(B) Stops (if running) &#xff; 0VG05CA(B)
Starts (local indication)
Cue - when directed to verify status of 0VG05CA(B)(depending on which VG train was started), report that 0VG05CA(B) is running.
Cue - when directed to verify status of 0VG05CA(B)(depending on which VG train was started), report that 0VG05CA(B) is running.
Cue - State that the JPM is complete when verifications are completed.
Cue - State that the JPM is complete when verifications are completed.
TERMINATING CUES:
TERMINATING CUES:
The Standby Gas Treatment System has been manually initiated to restore Secondary Containment differential pressure
The Standby Gas Treatment System has been manually initiated to restore Secondary Containment differential pressure.
. STOP TIME:
STOP TIME:
Page 12 of 14
 
JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
 
==Title:==
&#xa3; EO              &#xa3; RO                &#xa3; SRO            &#xa3; STA          &#xa3; SRO Cert JPM


JPM Number:  JPM474  - rev 00  Clinton Power Station Job Performance Measure (JPM)
==Title:==
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 13 of 14 Operator's Name:
Job Title:
&#xa3;  EO &#xa3;  RO &#xa3;  SRO &#xa3;  STA &#xa3;  SRO Cert JPM Title:
VF Trip During Swap of VC Trains (Alternate Path)
VF Trip During Swap of VC Trains (Alternate Path)
JPM Number:
JPM Number:     JPM474                                                        Revision Number: 00 Task Number and
JPM 47 4 Revision Number:
 
0 0 Task Number and Title:
==Title:==
340401.05 Respond to High or Low Fuel Building Differential Pressure K/A System K/A Number Importance (RO/SRO) 288000 A 4.01 3.1 2.9 Ability to manually operate and/or monitor in the control room: Start and stop fans.
340401.05 Respond to High or Low Fuel Building Differential Pressure K/A System         K/A Number                     Importance (RO/SRO) 288000               A4.01                     3.1                 2.9 Ability to manually operate and/or monitor in the control room: Start and stop fans.
Suggested Testing Environment:
Suggested Testing Environment:                 Simulator Actual Testing Environment:               &#xa2; Simulator             &#xa3; Plant         &#xa3; Control Room Testing Method:         &#xa3; Simulate                    Alternate Path:       &#xa2; Yes       &#xa3; No
Simulator Actual Testing Environment:
                          &#xa2; Perform                           SRO Only:       &#xa3; Yes       &#xa2; No Time Critical:       &#xa3; Yes           &#xa2; No Estimated Time to Complete:           15 minutes                 Actual Time Used:             minutes
&#xa2;   Simulator &#xa3; Plant &#xa3; Control Room Testing Method:
&#xa3; Simula te Alternate Path:
&#xa2; Yes &#xa3; No   &#xa2; Perform SRO Only: &#xa3; Yes &#xa2; No Time Critical:
&#xa3; Yes &#xa2; No Estimated Time to Complete:
15 minutes Actual Time Used:
minutes  


==References:==
==References:==
* CPS 3402.01P001, Rev 6 b CONTROL ROOM HVAC (VC) TRAIN SHIFTING
* CPS 3402.01P001, Rev 6b CONTROL ROOM HVAC (VC) TRAIN SHIFTING
* CPS 5042.05 (5D), Rev 31a ALARM PANEL 5042 ANNUNCIATORS  
* CPS 5042.05 (5D), Rev 31a ALARM PANEL 5042 ANNUNCIATORS - ROW 5
- ROW 5
* CPS 3319.01, Rev. 17 STANDBY GAS TREATMENT (VG)
* CPS 3319.01, Rev. 17 STANDBY GAS TREATMENT (VG)
* CPS 3404.01, Rev. 13e FUEL BUILDING HVAC (VF)
* CPS 3404.01, Rev. 13e FUEL BUILDING HVAC (VF)
Line 2,795: Line 2,716:


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                 &#xa3; Yes       &#xa3; No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             &#xa3; Satisfactory             &#xa3; Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                             (Print)
&#xa3; Yes &#xa3; No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Signature:                                                              Date:
&#xa3; Satisfactory
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            Page 13 of 14
&#xa3; Unsatisfactory Comments:
 
Evaluator's Name:
(Print)   Evaluator's Signature:
Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 14 of 14  INITIAL CONDITIONS:
INITIAL CONDITIONS:
Main Control Room Ventilation (VC) Train 'A' is in
Main Control Room Ventilation (VC) Train A is in-service.
-service. INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.
CAUTION
The CRS has directed you to shift Control Room HVAC (VC) trains to 'B' in service and 'A' secured in accordance with CPS 3402.01P001 CONTROL ROOM HVAC (VC) TRAIN SHIFTING starting at step 8.1.7.4.2.
                &sect;   All pre-job briefings are completed.
The CRS has directed you to shift Control Room HVAC (VC) trains to B in service and A secured in accordance with CPS 3402.01P001 CONTROL ROOM HVAC (VC) TRAIN SHIFTING starting at step 8.1.7.4.2.
The following steps have already been completed:
The following steps have already been completed:
* 8.1.7.1 - 8.1.7.3 (all steps)
* 8.1.7.1 - 8.1.7.3 (all steps)
* 8.1.7.4.1
* 8.1.7.4.1
* 8.1.7.5.1  
* 8.1.7.5.1 - 8.1.7.5.6
- 8.1.7.5.6
* 8.1.7.6.1 - 8.1.7.6.6 Report to the CRS when the task has been completed.
* 8.1.7.6.1  
Page 14 of 14
- 8.1.7.6.6 Report to the CRS when the task has been completed.


JPM247_R3 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure RCIC Startup at the RSP - Alternate Path JPM Number: JPM247 Revision Number: 0 3 Date: 9/19/16 Developed By:
CLINTON POWER STATION Job Performance Measure RCIC Startup at the RSP - Alternate Path JPM Number: JPM247 Revision Number: 03 Date: 9/19/16 Developed By:         T. Jennings                       9/19/16 Instructor                       Date Validated By:         Brian Glynn                       10/25/16 SME or Instructor                 Date Reviewed By:         Jim Lucas                         11/15/16 Operations Representative         Date Approved By:         T. Jennings                       11/15/16 Training Department               Date JPM247_R3 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111
T. Jennings 9/19/16   Instructor Date Validated By:
 
Brian Glynn 10/25/16   SME or Instructor Date Reviewed By:
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
Jim Lucas 11/15/16   Operations Representative Date Approved By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
T. Jennings 11/15/16   Training Department Date JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Page 2 of 23 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________     1. Task description and number, JPM description and number are identified.
________ 1.
________     2. Knowledge and Abilities (K/A) references are included.
Task description and number, JPM description and number are identified. ________ 2.
________     3. Performance location specified. (in-plant, control room, simulator, or other)
Knowledge and Abilities (K/A) references are included.
________     4. Initial setup conditions are identified.
________ 3.
________     5. Initiating cue (and terminating cue if required) are properly identified.
Performance location specified. (in-plant, control room, simulator, or other) ________ 4.
________     6. Task standards identified and verified by SME review.
Initial setup conditions are identified.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
________ 5.
(*).
Initiating cue (and terminating cue if required) are properly identified.
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 6.
Procedure CPS 4003.01               Rev: 17c Procedure CPS 4003.01C002           Rev: 5a Procedure CPS 4003.01C003           Rev: 1 Procedure OP-AA-101-111             Rev: 9
Task standards identified and verified by SME review.
________     9. Verify cues both verbal and visual are free of conflict.
________ 7.
________     10. Verify performance time is accurate
Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8.
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
Verify the procedure(s) referenced by this JPM reflects the current revision:
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Procedure CPS 4003.01 Rev: 17c Procedure CPS 4003.01C002 Rev: 5a Procedure CPS 4003.01C003 Rev: 1 Procedure OP-AA-101-111 Rev: 9 ________ 9.
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date Page 2 of 23
Verify cues both verbal and visual are free of conflict.
________ 10.
Verify performance time is accurate
________ 11.
If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12.
When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:  


SME / Instructor Date SME / Instructor Date SME / Instructor Date JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 23 Revision Record (Summary)
Revision Record (Summary)
Revision Date Description 00 08/08/09 Updated numbering convention and technically corrected. Old JPM number: 40030104LSA01.
Revision   Date                             Description 00     08/08/09 Updated numbering convention and technically corrected. Old JPM number: 40030104LSA01.
01 06/06/12 Updated format, aligned with procedure revision and revision numbers. 02 10/09/12 Revision due to procedure and template revision.
01     06/06/12 Updated format, aligned with procedure revision and revision numbers.
03 9/19/16 Updated procedure references.
02     10/09/12 Revision due to procedure and template revision.
03     9/19/16 Updated procedure references.
Page 3 of 23


JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
Page 4 of 23 Simulator Setup Instructions
Simulator Setup Instructions
: 1. IC Setup a. To establish initial conditions for JPM247, perform the following actions:
: 1. IC Setup
: 1) Reset to any at power IC. 2) Place Reactor Mode Switch in Shutdown and stabilize RPV level below level 3 but above level 2 with the Motor Driven Reactor Feed Pump. May have to secure RD Pumps to get level down.
: a. To establish initial conditions for JPM247, perform the following actions:
: 3) Open and execute Simulator Lesson Plan JPM247 to cause the RSP RCIC Flow Controller to be overridden in Manual.
: 1)   Reset to any at power IC.
: 4) Place the simulator in Run.
: 2)   Place Reactor Mode Switch in Shutdown and stabilize RPV level below level 3 but above level 2 with the Motor Driven Reactor Feed Pump. May have to secure RD Pumps to get level down.
: 5) Depress the RCIC Flow Controller Close Pushbutton until controller output is at zero.
: 3)   Open and execute Simulator Lesson Plan JPM247 to cause the RSP RCIC Flow Controller to be overridden in Manual.
: 6) Save to a different IC if JPM is being used more than once. IC-226 (PW-76319) is saved for the ILT 15-1 NRC Exam. 2. JPM Administration
: 4)   Place the simulator in Run.
: 1) Reset the simulator to the IC saved in step 1 above.
: 5)   Depress the RCIC Flow Controller Close Pushbutton until controller output is at zero.
: 2) Verify command A17_A01_A02_4 RSP RCIC Turb Flow Controller - Man/Auto =
: 6)   Save to a different IC if JPM is being used more than once. IC-226 (PW-76319) is saved for the ILT 15-1 NRC Exam.
: 2. JPM Administration
: 1)   Reset the simulator to the IC saved in step 1 above.
: 2)   Verify command A17_A01_A02_4 RSP RCIC Turb Flow Controller - Man/Auto =
Manual is active.
Manual is active.
: 3) Place book of Remote Shutdown procedures in RSP Room.
: 3)   Place book of Remote Shutdown procedures in RSP Room.
: 4) Verify RCIC is not initiated.
: 4)   Verify RCIC is not initiated.
: 5) Verify the RCIC controller at the Remote Shutdown Panel is in Auto set at 620 gpm.
: 5)   Verify the RCIC controller at the Remote Shutdown Panel is in Auto set at 620 gpm.
: 6) Verify the RCIC suction is aligned to the RCIC Storage Tank.
: 6)   Verify the RCIC suction is aligned to the RCIC Storage Tank.
: 7) No simulator lesson plan is required for this JPM once initial conditions have been established per step 1.
: 7)   No simulator lesson plan is required for this JPM once initial conditions have been established per step 1.
: 8) Freeze Simulator.
: 8)   Freeze Simulator.
Page 4 of 23


JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 23 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
TASK STANDARDS:
* The RCIC System is started from the Remote Shutdown Panel and injecting to the Reactor Vessel to restore and control RPV water level, Level 3 to Level 8 per CPS 4003.01C002 RSP - RCIC Operation. TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* The RCIC System is started from the Remote Shutdown Panel and injecting to the Reactor Vessel to restore and control RPV water level, Level 3 to Level 8 per CPS 4003.01C002 RSP -
RCIC Operation.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
* CPS 4003.01, REMOTE SHUTDOWN (RS)
* CPS 4003.01, REMOTE SHUTDOWN (RS)
* CPS 4003.01C002, RSP  
* CPS 4003.01C002, RSP - RCIC OPERATION
- RCIC OPERATION
* CPS 4003.01C003, RSP - RCIC ALARM LIGHT RESPONSES
* CPS 4003.01C003, RSP  
* OP-AA-101-111, ROLES AND RESPONSIBILITES OF ON-SHIFT PERSONNEL EVALUATOR INSTRUCTIONS:
- RCIC ALARM LIGHT RESPONSES
* OP-AA-101-111, ROLES AND RESPONSIBILITES OF ON
-SHIFT PERSONNEL EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
* All pre-job briefings are completed.
Line 2,887: Line 2,804:
* When the examinee has acknowledged the initiating cue, provide him/her with the following procedures:
* When the examinee has acknowledged the initiating cue, provide him/her with the following procedures:
o CPS 4003.01 Remote Shutdown (RS) - place kept with step 4.1.1 marked N/A.
o CPS 4003.01 Remote Shutdown (RS) - place kept with step 4.1.1 marked N/A.
o CPS 4003.01C002 RSP - RCIC Operations (blank) o CPS 4003.01C003 RSP - RCIC Alarm Light Responses (blank)  
o CPS 4003.01C002 RSP - RCIC Operations (blank) o CPS 4003.01C003 RSP - RCIC Alarm Light Responses (blank)
Page 5 of 23


JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 23  INITIAL CONDITIONS:
INITIAL CONDITIONS:
A plant transient has resulted in a reactor scram, loss of Feedwater, and loss of RCIC control from 1H13-P601.
A plant transient has resulted in a reactor scram, loss of Feedwater, and loss of RCIC control from 1H13-P601.
INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.
CAUTION
The CRS directs you to startup the RCIC system from the Remote Shutdown Panel and inject to the Reactor Vessel to restore and control RPV water level from Level 3 to Level 8 per CPS 4003.01 Remote Shutdown (RS) section 4.3, CPS 4003.01C002, RSP - RCIC Operation and CPS 4003.01C003, RSP - Alarm Light Responses. Inform the CRS when the task is complete.
              &sect;   All pre-job briefings are completed.
START TIME:
The CRS directs you to startup the RCIC system from the Remote Shutdown Panel and inject to the Reactor Vessel to restore and control RPV water level from Level 3 to Level 8 per CPS 4003.01 Remote Shutdown (RS) section 4.3, CPS 4003.01C002, RSP - RCIC Operation and CPS 4003.01C003, RSP -
Alarm Light Responses.
Inform the CRS when the task is complete.
START TIME:
Page 6 of 23


JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
Page 7 of 23 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS 4003.01C002 RSP - RCIC Operation 4.0 RCIC TRANSFER TO THE RSP
PERFORMANCE STEPS 4003.01C002 RSP - RCIC Operation 4.0 RCIC TRANSFER TO THE RSP


Line 2,906: Line 2,828:
* 120 VAC CONTROL POWER CKT #12, AB MCC 1A1
* 120 VAC CONTROL POWER CKT #12, AB MCC 1A1
: 2. RCIC TURBINE TRIP in NORM.
: 2. RCIC TURBINE TRIP in NORM.
: 3. RCIC TURB FLOW CONTROLLER, C61-R001 set to A (Automatic)/620 gpm. Standard
: 3. RCIC TURB FLOW CONTROLLER, C61-R001 set to A (Automatic)/620 gpm.
Standard
* For substep 1, the examinee verifies two blue lights lit on the upper left hand side of the Remote Shutdown Panel.
* For substep 1, the examinee verifies two blue lights lit on the upper left hand side of the Remote Shutdown Panel.
* For substep 2, the examinee verifies the RCIC Turbine Trip switch in Norm (vertical) in the center of the Remote Shutdown Panel.
* For substep 2, the examinee verifies the RCIC Turbine Trip switch in Norm (vertical) in the center of the Remote Shutdown Panel.
* For substep 3, the examinee verifies the RCIC Turbine Flow Controller M/A slide switch is positioned to the right and the tape set is set to 620 gpm. Cue: None Comments SAT   &#xa3; UNSAT   &#xa3; Comment Number  
* For substep 3, the examinee verifies the RCIC Turbine Flow Controller M/A slide switch is positioned to the right and the tape set is set to 620 gpm.
Cue:               None Comments SAT &#xa3;               UNSAT &#xa3;                 Comment Number Page 7 of 23


JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
Page 8 of 23 *4.2 Verify / Place following TRANSFER SWITCHES to EMERG:
*4.2     Verify / Place following TRANSFER SWITCHES to EMERG:
: 1. C61-S3 2. C61-S2 3. C61-S11 Standard: Examinee places the above 3 switches in the EMERG position. Cue: None Comments SAT   &#xa3; UNSAT   &#xa3; Comment Number 4.3 Verify GLAND SEAL COMPRESSOR, 1E51
: 1.     C61-S3
-C002F in STOP if compressor is off , or in START if the compressor is running.
: 2.     C61-S2
Standard Examinee verifies control switch for the RCIC Gland Seal Compressor, 1E51-C002F is in the vertical position (STOP). Cue: None Comments  SAT  &#xa3; UNSAT  &#xa3; Comment Number JPM Number:  JPM247 - rev 03  Clinton Power Station Job Performance Measure (JPM)
: 3.     C61-S11 Standard: Examinee places the above 3 switches in the EMERG position.
Page 9 of 23  *4.4 Verify / Place TRANSFER SWITCH C61-S4 to EMERG. Standard Examinee places Transfer Switch C61-S4 in the EMERG position. Cue: None Comments  SAT  &#xa3; UNSAT  &#xa3; Comment Number 4.5 Place/verify 1E51-F068, RCIC TURB E XH TO SUPPR P OOL STOP V LV switch in OPEN. Standard Examinee verifies 1E51-F068, RCIC Turb Exh To Suppr Pool Stop Vlv is in the OPEN position by verifying the control switch is rotated clockwise to the OPEN position and observing the RED status light is lit and the green status light is extinguished. Cue: None Comments SAT   &#xa3; UNSAT   &#xa3; Comment Number JPM Number:  JPM247 - rev 03  Clinton Power Station Job Performance Measure (JPM)
Cue:     None Comments SAT &#xa3;             UNSAT &#xa3;               Comment Number 4.3       Verify GLAND SEAL COMPRESSOR, 1E51-C002F in STOP if compressor is off, or in START if the compressor is running.
Page 10 of 23   *4.6 Verify / Place TRANSFER SWITCH C61-S5 to EMERG. Standard Examinee places Transfer Switch C61-S5 in the EMERG position. Cue: None Comments  SAT  &#xa3; UNSAT  &#xa3; Comment Number 4.7.1 Verify open 1E51-F063, RHR & RCIC STM SUPP INBD ISOL VALVE.
Standard Examinee verifies control switch for the RCIC Gland Seal Compressor, 1E51-C002F is in the vertical position (STOP).
Standard Examinee verifies 1E51-F063 is OPEN by observing the RED status light is lit and the GREEN status light is off. Cue: None Comments  SAT  &#xa3; UNSAT  &#xa3; Comment Number   
Cue:     None Comments SAT &#xa3;             UNSAT &#xa3;               Comment Number Page 8 of 23


JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
Page 11 of 23 4.7.2 Verify open 1E51-F064, RHR & RCIC STM SUPP OUTBD ISOL VALVE.
*4.4    Verify / Place TRANSFER SWITCH C61-S4 to EMERG.
Standard Examinee verifies 1E51-F064 is OPEN by observing the RED status light is lit and the GREEN status light is off. Cue: None Comments Step 4.7.3 is N/A.
Standard Examinee places Transfer Switch C61-S4 in the EMERG position.
SAT   &#xa3; UNSAT   &#xa3; Comment Number 4.8 Check RCIC status:
Cue:    None Comments SAT &#xa3;            UNSAT &#xa3;                Comment Number 4.5      Place/verify 1E51-F068, RCIC TURB EXH TO SUPPR POOL STOP VLV switch in OPEN.
Standard Examinee verifies 1E51-F068, RCIC Turb Exh To Suppr Pool Stop Vlv is in the OPEN position by verifying the control switch is rotated clockwise to the OPEN position and observing the RED status light is lit and the green status light is extinguished.
Cue:    None Comments SAT &#xa3;            UNSAT &#xa3;                Comment Number Page 9 of 23
 
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
*4.6    Verify / Place TRANSFER SWITCH C61-S5 to EMERG.
Standard Examinee places Transfer Switch C61-S5 in the EMERG position.
Cue:    None Comments SAT &#xa3;            UNSAT &#xa3;            Comment Number 4.7.1    Verify open 1E51-F063, RHR & RCIC STM SUPP INBD ISOL VALVE.
Standard Examinee verifies 1E51-F063 is OPEN by observing the RED status light is lit and the GREEN status light is off.
Cue:    None Comments SAT &#xa3;            UNSAT &#xa3;            Comment Number Page 10 of 23
 
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM) 4.7.2   Verify open 1E51-F064, RHR & RCIC STM SUPP OUTBD ISOL VALVE.
Standard Examinee verifies 1E51-F064 is OPEN by observing the RED status light is lit and the GREEN status light is off.
Cue:     None Comments Step 4.7.3 is N/A.
SAT &#xa3;             UNSAT &#xa3;             Comment Number 4.8     Check RCIC status:
* RCIC TURB SPEED, C61-R003.
* RCIC TURB SPEED, C61-R003.
* RCIC PUMP FLOW, C61-R001-1. Standard Examinee observes meters C61-R003 and C61-R001-1 read 0 and determines RCIC is Shutdown. Cue: None Comments SAT   &#xa3; UNSAT   &#xa3; Comment Number  
* RCIC PUMP FLOW, C61-R001-1.
Standard Examinee observes meters C61-R003 and C61-R001-1 read 0 and determines RCIC is Shutdown.
Cue:     None Comments SAT &#xa3;             UNSAT &#xa3;             Comment Number Page 11 of 23


JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM) 4.8.1         IF RCIC is running, THEN verify that Section 5.0, RCIC STARTUP actions have occurred.
Page 12 of 23 4.8.1 IF RCIC is running, THEN verify that Section 5.0, RCIC STARTUP actions have occurred. OTHERWISE, proceed to 5.0, RCIC STARTUP to startup RCIC. Standard Examinee proceeds to Section 5.0 of 4003.01C002. Cue: None Comments SAT   &#xa3; UNSAT   &#xa3; Comment Number 5.0 RCIC STARTUP 5.1 At DC MCC 1A-12A (1DC13E12A), Shut circuit #21.
OTHERWISE, proceed to 5.0, RCIC STARTUP to startup RCIC.
Standard     Examinee proceeds to Section 5.0 of 4003.01C002.
Cue:         None Comments SAT &#xa3;             UNSAT &#xa3;               Comment Number 5.0 RCIC STARTUP 5.1           At DC MCC 1A-12A (1DC13E12A), Shut circuit #21.
[Energizes AOV 1E51-F005/F026 to allow for steam line/condensate pot drain down. Circuit will be deenergized in step 5.9.]
[Energizes AOV 1E51-F005/F026 to allow for steam line/condensate pot drain down. Circuit will be deenergized in step 5.9.]
Standard Examinee states they would perform or dispatches an Equipment Operator to shut circuit #21 at DC MCC 1A-12A (1DC13E12A) Cue: Acknowledge request/dispatch and state the component is in the position requested.
Standard     Examinee states they would perform or dispatches an Equipment Operator to shut circuit #21 at DC MCC 1A-12A (1DC13E12A)
Comments SAT   &#xa3; UNSAT   &#xa3; Comment Number
Cue:         Acknowledge request/dispatch and state the component is in the position requested.
Comments SAT &#xa3;             UNSAT &#xa3;               Comment Number Page 12 of 23


JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM) 5.2     Open 1E51-C002E, TURBINE TRIP THROTTLE VALVE.
Page 13 of 23 5.2 Open 1E51-C002E, TURBINE TRIP THROTTLE VALVE.
[Trips on Mechanical Overspeed]
[Trips on Mechanical Overspeed]
Standard Examinee verifies 1E51-C002E, Turbine Trip Throttle Valve is open by observing the RED status light is lit and the GREEN status light is extinguished. Cue: None Comments SAT   &#xa3; UNSAT   &#xa3; Comment Number 5.3 IF   RCIC Cond Stor Tnk Lvl, C61
Standard Examinee verifies 1E51-C002E, Turbine Trip Throttle Valve is open by observing the RED status light is lit and the GREEN status light is extinguished.
-R505 &#xb3; 3.2 ft, or Suppression Pool Level, C61-R504  
Cue:     None Comments SAT &#xa3;             UNSAT &#xa3;                 Comment Number 5.3     IF RCIC Cond Stor Tnk Lvl, C61-R505 3.2 ft, or Suppression Pool Level, C61-R504 19.9 ft, THEN Open 1E51-F010, RCIC STORAGE TANK SUCTION VALVE, OTHERWISE Open 1E51-F031, RCIC SUPPR POOL SUCTION VALVE.
&#xa3; 19.9 ft, THEN Open 1E51-F010, RCIC STORAGE TANK SUCTION VALVE, OTHERWISE Open 1E51-F031, RCIC SUPPR POOL SUCTION VALVE.
Standard Examinee observes RCIC Cond Stor Tnk Lvl and Suppression Pool Level indicators on the RSP and determines that RCIC tank level is > 3.2 ft and Suppression Pool Level is <19.9 ft and then determines 1E51-F010 is Open by observing the RED status light is lit and the GREEN status light is extinguished.
Standard Examinee observes RCIC Cond Stor Tnk Lvl and Suppression Pool Level indicators on the RSP and determines that RCIC tank level is > 3.2 ft and Suppression Pool Level is <19.9 ft and then determines 1E51-F010 is Open by observing the RED status light is lit and the GREEN status light is extinguished. Cue: None Comments SAT   &#xa3; UNSAT   &#xa3; Comment Number
Cue:     None Comments SAT &#xa3;             UNSAT &#xa3;                 Comment Number Page 13 of 23


JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM) 5.4     Open / Verify Open:
Page 14 of 23 5.4 Open / Verify Open: 1. 1E51-F077, RCIC EXH VAC BKR OUTBD ISOL VALVE.
: 1. 1E51-F077, RCIC EXH VAC BKR OUTBD ISOL VALVE.
: 2. 1E51-F078, RCIC EXH VAC BKR INBD ISOL VALVE.
: 2. 1E51-F078, RCIC EXH VAC BKR INBD ISOL VALVE.
Standard Examinee verifies 1E51-F077, RCIC Exh Vac Bkr Outbd Isol Valve and 1E51-F078, RCIC Exh Vac Bkr Inbd Isol Valve are open by observing RED status lights are lit and GREEN status lights are extinguished. Cue: None Comments SAT   &#xa3; UNSAT   &#xa3; Comment Number 5.5 Start GLAND SEAL COMPRESSOR, 1E51-C002F. Standard Examinee rotates the control switch for the Gland Seal Compressor, 1E51-C002F clockwise to the start position and and verifies the RED status light is lit and the GREEN status light is extinguished. Cue: None Comments This step is not critical because RCIC will perform its intended safety function without the Gland Seal Air Compressor running.
Standard Examinee verifies 1E51-F077, RCIC Exh Vac Bkr Outbd Isol Valve and 1E51-F078, RCIC Exh Vac Bkr Inbd Isol Valve are open by observing RED status lights are lit and GREEN status lights are extinguished.
SAT   &#xa3; UNSAT   &#xa3; Comment Number  
Cue:     None Comments SAT &#xa3;               UNSAT &#xa3;               Comment Number 5.5     Start GLAND SEAL COMPRESSOR, 1E51-C002F.
Standard Examinee rotates the control switch for the Gland Seal Compressor, 1E51-C002F clockwise to the start position and and verifies the RED status light is lit and the GREEN status light is extinguished.
Cue:     None Comments This step is not critical because RCIC will perform its intended safety function without the Gland Seal Air Compressor running.
SAT &#xa3;               UNSAT &#xa3;               Comment Number Page 14 of 23


JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
Page 15 of 23  *5.6 Open 1E51-F019, RCIC PMP MIN FLOW RECIRC TO SUPPR POOL.
*5.6     Open 1E51-F019, RCIC PMP MIN FLOW RECIRC TO SUPPR POOL.
Standard Examinee rotates the control switch for 1E51-F019, RCIC Pmp Min Flow Recirc To Suppr Pool clockwise to the open position and verifies the RED status light is lit and the GREEN status light is extinguished. Cue: None Comments SAT   &#xa3; UNSAT   &#xa3; Comment Number 5.7 Open / Verify Open 1E51-F0 68, RCIC TURB EXH TO SUPPR POOL STOP V LV. Standard Examinee verifies 1E51-F068, RCIC Turb Exh To Suppr Pool Stop Vlv open by observing the RED status light is lit and the GREEN status light is extinguished. Cue: None Comments SAT   &#xa3; UNSAT   &#xa3; Comment Number  
Standard Examinee rotates the control switch for 1E51-F019, RCIC Pmp Min Flow Recirc To Suppr Pool clockwise to the open position and verifies the RED status light is lit and the GREEN status light is extinguished.
Cue:     None Comments SAT &#xa3;             UNSAT &#xa3;                 Comment Number 5.7     Open / Verify Open 1E51-F068, RCIC TURB EXH TO SUPPR POOL STOP VLV.
Standard Examinee verifies 1E51-F068, RCIC Turb Exh To Suppr Pool Stop Vlv open by observing the RED status light is lit and the GREEN status light is extinguished.
Cue:     None Comments SAT &#xa3;             UNSAT &#xa3;                 Comment Number Page 15 of 23


JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
Page 16 of 23  *5.8 Open 1E51-F045, RCIC T URB S TM SUPP SHUTOFF VALVE. Standard Examinee opens 1E51-F045, RCIC Turb Stm Supp Shutoff Valve and observes RED status light is lit and the GREEN status light is extinguished. Cue: None Comments Due to RCIC Turbine Speed being low because of C61-R001 Controller failure, it is acceptable for the examinee to take manual control and adjust the C61-R001 Controller (manual actions for failed Auto Actions).
*5.8     Open 1E51-F045, RCIC TURB STM SUPP SHUTOFF VALVE.
SAT   &#xa3; UNSAT   &#xa3; Comment Number 5.9 While continuing with steps 5.10 or 5.11: At DC MCC 1A-12A (1DC13E12A), open circuit #21. [Deenergizes AOV 1E51-F005/F026 to prevent possible steam releases (temp/rad concerns) into RCIC room and Turbine Bldg.]
Standard Examinee opens 1E51-F045, RCIC Turb Stm Supp Shutoff Valve and observes RED status light is lit and the GREEN status light is extinguished.
Standa rd Examinee state they would perform or dispatches an equipment operator to open circuit #21 at DC MCC 1A-12A.
Cue:     None Comments Due to RCIC Turbine Speed being low because of C61-R001 Controller failure, it is acceptable for the examinee to take manual control and adjust the C61-R001 Controller (manual actions for failed Auto Actions).
SAT &#xa3;               UNSAT &#xa3;             Comment Number 5.9     While continuing with steps 5.10 or 5.11:
At DC MCC 1A-12A (1DC13E12A), open circuit #21.
[Deenergizes AOV 1E51-F005/F026 to prevent possible steam releases (temp/rad concerns) into RCIC room and Turbine Bldg.]
Standard Examinee state they would perform or dispatches an equipment operator to open circuit #21 at DC MCC 1A-12A.
Acknowledge request/dispatch and state the component is in the position requested.
Acknowledge request/dispatch and state the component is in the position requested.
Comments SAT   &#xa3; UNSAT   &#xa3; Comment Number  
Comments SAT &#xa3;               UNSAT &#xa3;             Comment Number Page 16 of 23


JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
Page 17 of 23 *5.10.1 IF RCIC is required for RPV water level control, THEN Open 1E51-F013, RCIC PUMP DISCH TO RX OUTBD ISOL VALVE.
*5.10.1 IF RCIC is required for RPV water level control, THEN Open 1E51-F013, RCIC PUMP DISCH TO RX OUTBD ISOL VALVE.
Standard Examinee turns the control switch for 1E51-F013, RCIC Pump Disch To Rx Outbd Isol Valve clockwise to the open position and observes th e RED status light is lit and the GREEN status light is extinguished. Cue: None Comments Per limitation 3.5, the minimum flow orifice is sized for 60 to 76 gpm. RCIC pump operation under this condition should be limited to < 20 seconds to prevent potential degradation of internal pump parts.
Standard Examinee turns the control switch for 1E51-F013, RCIC Pump Disch To Rx Outbd Isol Valve clockwise to the open position and observes the RED status light is lit and the GREEN status light is extinguished.
SAT   &#xa3; UNSAT   &#xa3; Comment Number 5.10.2 Shut 1E51-F022, RCIC PMP FIRST TEST VALVE TO STOR TNK.
Cue:     None Comments Per limitation 3.5, the minimum flow orifice is sized for 60 to 76 gpm. RCIC pump operation under this condition should be limited to < 20 seconds to prevent potential degradation of internal pump parts.
Standard Examinee verifies 1E51-F022, RCIC Pmp First Test Valve To Stor Tnk is shut by observing the RED status light is extinguished and the GREEN status light is lit. Cue: None Comments Valve is normally shut. SAT   &#xa3; UNSAT   &#xa3; Comment Number  
SAT &#xa3;               UNSAT &#xa3;               Comment Number 5.10.2   Shut 1E51-F022, RCIC PMP FIRST TEST VALVE TO STOR TNK.
Standard Examinee verifies 1E51-F022, RCIC Pmp First Test Valve To Stor Tnk is shut by observing the RED status light is extinguished and the GREEN status light is lit.
Cue:     None Comments Valve is normally shut.
SAT &#xa3;               UNSAT &#xa3;               Comment Number Page 17 of 23


JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM) 5.10.3   Shut 1E51-F059, RCIC PMP SECOND TEST VALVE TO STOR TNK.
Page 18 of 23  5.10.3 Shut 1E51-F059, RCIC PMP SECOND TEST VALVE TO STOR TNK.
Standard Examinee verifies 1E51-F059, RCIC Pmp Second Test Valve To Stor Tnk is shut by observing the RED status light is extinguished and the GREEN status light is lit.
Standard Examinee verifies 1E51-F059, RCIC Pmp Second Test Valve To Stor Tnk is shut by observing the RED status light is extinguished and the GREEN status light is lit. Cue: None Comments Valve is normally shut.
Cue:     None Comments Valve is normally shut.
SAT   &#xa3; UNSAT   &#xa3; Comment Number 5.10.4 Adjust RCIC TURB FLOW CONTROLLER, C61-R001 to maintain flow 80 to 700 gpm.
SAT &#xa3;             UNSAT &#xa3;                 Comment Number 5.10.4   Adjust RCIC TURB FLOW CONTROLLER, C61-R001 to maintain flow 80 to 700 gpm.
NOTE: Avoid AUTO when < 450 gpm (see Precaution 1.4). Standard Reports to SRO failure of RCIC controller or takes manual control of controller.
NOTE: Avoid AUTO when < 450 gpm (see Precaution 1.4).
Cue: When the student reports the controller has failed, cue the Examinee: "RCIC is needed to restore vessel level, inject with RCIC."
Standard Reports to SRO failure of RCIC controller or takes manual control of controller.
Comments Expected response it to take manual control to establish injection flow. Cue/direction to restore level.
Cue:     When the student reports the controller has failed, cue the Examinee: RCIC is needed to restore vessel level, inject with RCIC.
SAT   &#xa3; UNSAT   &#xa3; Comment Number BEGIN ALTERNATE PATH
Comments Expected response it to take manual control to establish injection flow.
Cue/direction to restore level.
SAT &#xa3;             UNSAT &#xa3;                 Comment Number BEGIN ALTERNATE PATH Page 18 of 23


JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
Page 19 of 23
* Places controller C61-R001 selector to M (MANUAL).
* Places controller C61
Standard Examinee positions Controller C61-R001 mode selector to the left in M position.
-R001 selector to 'M' (MANUAL).
Cue:     None Comments OP-AA-101-111 step 4.7.2.5 directs taking manual control.
Standard Examinee positions Controller C61-R001 mode selector to the left in 'M' position. Cue: None Comments OP-AA-101-111 step 4.7.2.5 directs taking manual control.
SAT &#xa3;             UNSAT &#xa3;               Comment Number
SAT   &#xa3; UNSAT   &#xa3; Comment Number
* Adjusts controller in MANUAL to raise RCIC turbine speed and pump flow above minimum requirements and to achieve rising RPV level.
* Adjusts controller in MANUAL to raise RCIC turbine speed and pump flow above minimum requirements and to achieve rising RPV level.
Standard Examinee adjusts Controller to establish >60 gpm flow and >1500 rpm and rising RPV level. Cue: None Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number     
Standard Examinee adjusts Controller to establish >60 gpm flow and >1500 rpm and rising RPV level.
Cue:     None Comments SAT &#xa3;             UNSAT &#xa3;               Comment Number Page 19 of 23
 
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM) 5.10.5   Shut 1E51-F019, RCIC PMP MIN FLOW RECIRC TO SUPPR POOL.
Standard  Examinee shuts 1E51-F019, RCIC Pmp Min Flow Recirc To Suppr Pool and observes the RED status light is extinguished and the GREEN status light is lit.
Cue:      None Comments  Valve is normally shut.
SAT &#xa3;              UNSAT &#xa3;                Comment Number 5.10.6    Verify 1VY04C, RCIC PMP RM SPLY FAN has started.
Standard  Examinee verifies 1VY04C, RCIC Pmp Rm Sply Fan has started by observing the RED status light is lit and the GREEN status light is extinguished.
Cue:      None Comments SAT &#xa3;              UNSAT &#xa3;                Comment Number Task Completion Standard: Informs Control Room Supervisor he/she has commenced RCIC injection into the Reactor Pressure Vessel.
Cue:      Acknowledge the report. State JPM is complete.
Comments SAT &#xa3;              UNSAT &#xa3;                Comment Number Page 20 of 23
 
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
STOP TIME: _____________________
Page 21 of 23


JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)
Page 20 of 23  5.10.5 Shut 1E51-F019, RCIC PMP MIN FLOW RECIRC TO SUPPR POOL.
Operators Name:
Standard Examinee shuts 1E51-F019, RCIC Pmp Min Flow Recirc To Suppr Pool and observes the RED status light is extinguished and the GREEN status light is lit. Cue: None Comments Valve is normally shut.
Job
SAT  &#xa3; UNSAT  &#xa3; Comment Number 5.10.6 Verify 1VY04C, RCIC PMP RM SPLY FAN has started.
 
Standard Examinee verifies 1VY04 C, RCIC Pmp Rm Sply Fan has started by observing the RED status light is lit and the GREEN status light is extinguished. Cue: None Comments  SAT  &#xa3; UNSAT  &#xa3; Comment Number Task Completion Standard: Informs Control Room Supervisor he/she has commenced RCIC injection into the Reactor Pressure Vessel.
==Title:==
Cue: Acknowledge the report. State JPM is complete.
&#xa3; EO             &#xa3; RO               &#xa3; SRO           &#xa3; STA       &#xa3; SRO Cert JPM
Comments  SAT  &#xa3; UNSAT  &#xa3; Comment Number JPM Number:  JPM247 - rev 03  Clinton Power Station Job Performance Measure (JPM)
 
Page 21 of 23 STOP TIME:
==Title:==
_____________________
RCIC Startup at the RSP - Alternate Path JPM Number:       JPM247                                                     Revision Number: 02 Task Number and
JPM Number:  JPM247 - rev 03  Clinton Power Station Job Performance Measure (JPM)
 
SRRS: 3D.105 (when utilized for operator initial or continuing training)      Page 22 of 23 Operator's Name:
==Title:==
Job Title:  
40030104, Remote Shutdown tasks that DO require MCR evacuation K/A System           K/A Number                                 Importance (RO/SRO) 217000                   A2.10                           3.1                       3.1 Ability to (a) predict the impacts of the following on the RCIC ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Turbine control system failures Suggested Testing Environment:                 Simulator Actual Testing Environment:               &#xa2; Simulator             &#xa3; Plant       &#xa3; Control Room Testing Method:         &#xa3; Simulate                     Alternate Path:     &#xa2; Yes       &#xa3; No
&#xa3; EO &#xa3; RO &#xa3; SRO &#xa3; STA &#xa3; SRO Cert JPM Title:
                          &#xa2; Perform                           SRO Only:     &#xa3; Yes       &#xa2; No Time Critical:       &#xa3; Yes           &#xa2; No Estimated Time to Complete:           20 minutes                 Actual Time Used:             minutes
RCIC Startup at the RSP  
- Alternate Path JPM Number: JPM247 Revision Number: 02 Task Number and Title: 40030104, Remote Shutdown tasks that DO require MCR evacuation K/A System K/A Number Importance (RO/SRO) 217000 A2.10 3.1 3.1 Ability to (a) predict the impacts of the following on the RCIC ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Turbine control system failures Suggested Testing Environment:
Simulator Actual Testing Environment:
&#xa2;   Simulator &#xa3; Plant &#xa3; Control Room Testing Method:
&#xa3; Simulate Alternate Path:
&#xa2; Yes &#xa3; No   &#xa2; Perform SRO Only: &#xa3; Yes &#xa2; No Time Critical:
&#xa3; Yes &#xa2; No Estimated Time to Complete: 20 minutes Actual Time Used:   minutes  


==References:==
==References:==


CPS 4003.01, REMOTE SHUTDOWN (RS), Rev. 17c CPS 4003.01C002, RSP  
CPS 4003.01, REMOTE SHUTDOWN (RS), Rev. 17c CPS 4003.01C002, RSP - RCIC OPERATION, Rev. 5a CPS 4003.01C003, RSP - RCIC ALARM LIGHT RESPONSES, Rev. 1 OP-AA-101-111, ROLES AND RESPONSIBILITES OF ON-SHIFT PERSONNEL, Rev. 9*
- RCIC OPERATION, Rev. 5a CPS 4003.01C003, RSP  
* Procedure is not required to be copied for JPM administration.
- RCIC ALARM LIGHT RESPONSES, Rev. 1 OP-AA-101-111, ROLES AND RESPONSIBILITES OF ON
EVALUATION  
-SHIFT PERSONNEL, Rev. 9*
* Procedure is not required to be copied for JPM administration. EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                 &#xa3; Yes       &#xa3; No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             &#xa3; Satisfactory             &#xa3; Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                            (Print)
&#xa3; Yes &#xa3; No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:  
Evaluators Signature:                                                            Date:
&#xa3; Satisfactory
SRRS: 3D.105 (when utilized for operator initial or continuing training)                          Page 22 of 23
&#xa3; Unsatisfactory Comments:


Evaluator's Name:    (Print)
Evaluator's Signature:  Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 23 of 23  INITIAL CONDITIONS:
INITIAL CONDITIONS:
A plant transient has resulted in a reactor scram, loss of Feedwater, and loss of RCIC control from 1H13-P601.
A plant transient has resulted in a reactor scram, loss of Feedwater, and loss of RCIC control from 1H13-P601.
INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.
CAUTION
              &sect;   All pre-job briefings are completed.
The CRS directs you to startup the RCIC system from the Remote Shutdown Panel and inject to the Reactor Vessel to restore and control RPV water level from Level 3 to Level 8 per CPS 4003.01 Remote Shutdown (RS) section 4.3, CPS 4003.01C002, RSP - RCIC Operation and CPS 4003.01C003, RSP -
The CRS directs you to startup the RCIC system from the Remote Shutdown Panel and inject to the Reactor Vessel to restore and control RPV water level from Level 3 to Level 8 per CPS 4003.01 Remote Shutdown (RS) section 4.3, CPS 4003.01C002, RSP - RCIC Operation and CPS 4003.01C003, RSP -
Alarm Light Responses. Inform the CRS when the task is complete.  
Alarm Light Responses.
Inform the CRS when the task is complete.
Page 23 of 23
 
CLINTON POWER STATION Job Performance Measure High Containment Pool Level Protective Actions JPM Number: JPM222 Revision Number: 02 Date: 09/19/2016 Developed By:          Tony Jennings                    09/19/16 Instructor                        Date Validated By:        Brian Glynn                      10/27/16 SME or Instructor                Date Reviewed By:          Jim Lucas                        11/15/16 Operations Representative        Date Approved By:          T. Jennings                      11/15/16 Training Department              Date JPM222_ R02 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111


JPM222_ R02 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure High Containment Pool Level Protective Actions JPM Number:  JPM222 Revision Number: 02 Date:  0 9/1 9/2016 Developed By:
JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Tony Jennings 0 9/1 9/1 6  Instructor Date  Validated By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Brian Glynn 10/27/1 6  SME or Instructor Date  Reviewed By:
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Jim Lucas  11/15/16  Operations Representative Date  Approved By:
________     1. Task description and number, JPM description and number are identified.
T. Jennings 11/15/16  Training Department Date JPM Number: JPM222 -
________     2. Knowledge and Abilities (K/A) references are included.
Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
________     3. Performance location specified. (in-plant, control room, simulator, or other)
Page 2 of 13 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________     4. Initial setup conditions are identified.
________ 1.
________     5. Initiating cue (and terminating cue if required) are properly identified.
Task description and number, JPM description and number are identified. ________ 2.
________     6. Task standards identified and verified by SME review.
Knowledge and Abilities (K/A) references are included.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
________ 3.
(*).
Performance location specified. (in-plant, control room, simulator, or other) ________ 4.
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Initial setup conditions are identified.
Procedure CPS 4411.05               Rev: 4b Procedure                           Rev:
________ 5.
Procedure                           Rev:
Initiating cue (and terminating cue if required) are properly identified.
________     9. Verify cues both verbal and visual are free of conflict.
________ 6.
________     10. Verify performance time is accurate
Task standards identified and verified by SME review.
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 7.
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8.
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date Page 2 of 13
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure CPS 4411.05 Rev: 4b Procedure Rev:   Procedure Rev:   ________ 9.
Verify cues both verbal and visual are free of conflict.
________ 10.
Verify performance time is accurate
________ 11.
If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12.
When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:  


SME / Instructor Date SME / Instructor Date SME / Instructor Date JPM Number: JPM222 -
JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
Revision Record (Summary)
Page 3 of 13 Revision Record (Summary)
Revision   Date                             Description 00     07/11/2007 Updated numbering convention. Old JPM number:
Revision Date Description 00 07/11/2007 Updated numbering convention. Old JPM number: 44110502NSN01.
44110502NSN01.
01 08/02/2010 Updated format and task number 02 06/14/13 Updated to new template
01     08/02/2010 Updated format and task number 02     06/14/13 Updated to new template Page 3 of 13


JPM Number: JPM222 -
JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
Page 4 of 13 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
TASK STANDARDS:
TASK STANDARDS:
* Complete the Outside MCR portion of CPS No. 4411.05 High Containment Pool Level Protective Actions, Table 1, TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* Complete the Outside MCR portion of CPS No. 4411.05 High Containment Pool Level Protective Actions, Table 1, TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* None. PROCEDURAL/
* None.
PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
Line 3,080: Line 3,035:
* Once the initiating cue has been acknowledged by the examinee, provide him/her with a marked up copy of CPS 4411.05 High Containment Pool Level Protective Actions with the following notations:
* Once the initiating cue has been acknowledged by the examinee, provide him/her with a marked up copy of CPS 4411.05 High Containment Pool Level Protective Actions with the following notations:
* Page 2, step 2.1, TABLE 1 STARTED: <10 minutes prior to current time>
* Page 2, step 2.1, TABLE 1 STARTED: <10 minutes prior to current time>
* Page 4, STARTED: <today's date> / <10 minutes prior to current time>
* Page 4, STARTED: <todays date> / <10 minutes prior to current time>
* Page 4, step 1) MCR - fill in initials for MCR actions in Table 1  
* Page 4, step 1) MCR - fill in initials for MCR actions in Table 1 Page 4 of 13


JPM Number: JPM222 -
JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS:
Page 5 of 13  INITIAL CONDITIONS:
The decision has been made to flood the Primary Containment. Current level in the Primary Containment is 22 5 and rising at ~1 every 5 minutes.
The decision has been made to flood the Primary Containment. Current level in the Primary Containment is 22
&#xa2; 5&#xb2; and rising at ~1" every 5 minutes.
INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.  
CAUTION
&sect; No equipment or controls will be manipulated during this evaluation, only Simulated actions will occur.
              &sect;   All pre-job briefings are completed.
&sect; Do NOT shine any type light into a panel. You are directed to deenergize electrical loads per CPS No. 4411.05 High Containment Pool Level Protective Actions, Table 1, Section 2, OUTSIDE MCR. Report to the CRS after completing the task. START TIME:
              &sect;   No equipment or controls will be manipulated during this evaluation, only Simulated actions will occur.
              &sect;   Do NOT shine any type light into a panel.
You are directed to deenergize electrical loads per CPS No. 4411.05 High Containment Pool Level Protective Actions, Table 1, Section 2, OUTSIDE MCR.
Report to the CRS after completing the task.
START TIME:
Page 5 of 13


JPM Number: JPM222 -
JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
Page 6 of 13 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS No. 4411.05 High Containment Pool Level Protective Actions Deenergizes electrical equipment per Table 1, Section 2 Outside MCR.
PERFORMANCE STEPS CPS No. 4411.05 High Containment Pool Level Protective Actions Deenergizes electrical equipment per Table 1, Section 2 Outside MCR.
At AB 781&#xa2; East
At AB 781 East At AB MCC 1A1, Cubicle 1D place both breakers to the OFF position for
* At AB MCC 1A1, Cubicle 1D place both breakers to the OFF position for Drywell Cooling Fan 1A.
* Drywell Cooling Fan 1A.
Standard:
Standard:
* Examinee wears the following PPE(as a minimum):
* Examinee wears the following PPE(as a minimum):
o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants
o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants
* Examinee simulates rotating both breaker handles to the OFF position. Cue: The breaker handles are in the position described.
* Examinee simulates rotating both breaker handles to the OFF position.
Comments The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.
Cue:               The breaker handles are in the position described.
SAT   &#xa3; UNSAT   &#xa3; Comment Number  
Comments           The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.
SAT &#xa3;             UNSAT &#xa3;                 Comment Number Page 6 of 13


JPM Number: JPM222 -
JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
At AB 762 East At AB MCC 1F, Cubicle 3D place both breakers to the OFF position for
Page 7 of 13  At AB 762&#xa2; East
* Drywell Equip Drain Sump Pump 1A.
* At AB MCC 1F, Cubicle 3D place both breakers to the OFF position for Drywell Equip Drain Sump Pump 1A.
Standard:
Standard:
* Examinee wears the following PPE(as a minimum):
* Examinee wears the following PPE(as a minimum):
o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants
o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants
* Examinee simulates rotating both breaker handles to the OFF position. Cue: The breaker handles are in the position described.
* Examinee simulates rotating both breaker handles to the OFF position.
Comments The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.
Cue:             The breaker handles are in the position described.
SAT   &#xa3; UNSAT   &#xa3; Comment Number
Comments         The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.
SAT &#xa3;             UNSAT &#xa3;                 Comment Number Page 7 of 13


JPM Number: JPM222 -
JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
At AB 762 East At AB MCC 1F, Cubicle 5B place both breakers to the OFF position for
Page 8 of 13  At AB 762&#xa2; East
* Drywell Floor Drain Sump Pump 1A.
* At AB MCC 1F, Cubicle 5B place both breakers to the OFF position for Drywell Floor Drain Sump Pump 1A.
Standard:
Standard:
* Examinee wears the following PPE(as a minimum):
* Examinee wears the following PPE(as a minimum):
o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants
o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants
* Examinee simulates rotating both breaker handles to the OFF position
* Examinee simulates rotating both breaker handles to the OFF position.
. Cue: The breaker handles are in the position described.
Cue:             The breaker handles are in the position described.
Comments The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.
Comments         The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.
SAT   &#xa3; UNSAT   &#xa3; Comment Number
SAT &#xa3;             UNSAT &#xa3;                 Comment Number Page 8 of 13


JPM Number: JPM222 -
JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
At AB 762 West At AB MCC 1G, Cubicle 4A place both breakers to the OFF position for
Page 9 of 13  At AB 762&#xa2; West
* Drywell Equip Drain Sump Pump 1B.
* At AB MCC 1G, Cubicle 4A place both breakers to the OFF position for Drywell Equip Drain Sump Pump 1B.
Standard:
Standard:
* Examinee wears the following PPE(as a minimum):
* Examinee wears the following PPE(as a minimum):
o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants
o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants
* Examinee simulates rotating both breaker handles to the OFF position
* Examinee simulates rotating both breaker handles to the OFF position.
. Cue: The breaker handles are in the position described.
Cue:           The breaker handles are in the position described.
Comments The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.
Comments       The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.
SAT   &#xa3; UNSAT   &#xa3; Comment Number
SAT &#xa3;             UNSAT &#xa3;                 Comment Number Page 9 of 13


JPM Number: JPM222 -
JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
At AB 762 West At AB MCC 1G, Cubicle 4C place both breakers to the OFF position for
Page 10 of 13  At AB 762&#xa2; West
* Drywell Floor Drain Sump Pump 1B.
* At AB MCC 1G, Cubicle 4C place both breakers to the OFF position for Drywell Floor Drain Sump Pump 1B.
Standard:
Standard:
* Examinee wears the following PPE(as a minimum):
* Examinee wears the following PPE(as a minimum):
o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants
o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants
* Examinee simulates rotating both breaker handles to the OFF position
* Examinee simulates rotating both breaker handles to the OFF position.
. Cue: The breaker handles are in the position described.
Cue:           The breaker handles are in the position described.
Comments The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.
Comments       The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.
SAT   &#xa3; UNSAT   &#xa3; Comment Number
SAT &#xa3;             UNSAT &#xa3;                 Comment Number Page 10 of 13


JPM Number: JPM222 -
JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
At AB 781 West At AB MCC 1B1, Cubicle 2C place both breakers to the OFF position for
Page 11 of 13  At AB 781&#xa2; West
* Drywell Cooling Fan 1B.
* At AB MCC 1B1, Cubicle 2C place both breakers to the OFF position for Drywell Cooling Fan 1B.
Standard:
Standard:
* Examinee wears the following PPE(as a minimum):
* Examinee wears the following PPE(as a minimum):
o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants
o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants
* Examinee simulates rotating both breaker handles to the OFF position
* Examinee simulates rotating both breaker handles to the OFF position.
. Cue: The breaker handles are in the position described.
Cue:               The breaker handles are in the position described.
Comments The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.
Comments           The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.
SAT   &#xa3; UNSAT   &#xa3; Comment Number TERMINATING CUES:
SAT &#xa3;             UNSAT &#xa3;                 Comment Number TERMINATING CUES:
All breakers simulated being placed in the OFF position per CPS No. 4411.05 High Containment Pool Level Protective Actions, Table 1, Section 2, Outside MCR. STOP TIME:
All breakers simulated being placed in the OFF position per CPS No. 4411.05 High Containment Pool Level Protective Actions, Table 1, Section 2, Outside MCR.
STOP TIME:
Page 11 of 13
 
JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
 
==Title:==
&#xa3; EO              &#xa3; RO                &#xa3; SRO            &#xa3; STA          &#xa3; SRO Cert JPM
 
==Title:==
High Containment Pool Level Protective Actions JPM Number:      JPM222                                                        Revision Number: 02 Task Number and


JPM Number:  JPM222  -
==Title:==
Rev 0 2  Clinton Power Station Job Performance Measure (JPM)
441105.01 High Containment Pool Level Protective Actions K/A System         K/A Number                     Importance (RO/SRO) 295029               2.4.35                     3.8                 4.0 Knowledge of local auxiliary operator tasks during an emergency and the resultant operational effects.
SRRS: 3D.105 (when utilized for operator initial or continuing training)      Page 12 of 13 Operator's Name:
Suggested Testing Environment:               Plant Actual Testing Environment:               &#xa3; Simulator             &#xa2; Plant         &#xa3; Control Room Testing Method:         &#xa2; Simulate                     Alternate Path:       &#xa3; Yes       &#xa2; No
Job Title:  
                          &#xa3; Perform                           SRO Only:       &#xa3; Yes       &#xa2; No Time Critical:       &#xa3; Yes           &#xa2; No Estimated Time to Complete:           18 minutes                 Actual Time Used:             minutes
&#xa3;  EO &#xa3;  RO &#xa3;  SRO &#xa3;  STA &#xa3;  SRO Cert JPM Title:
*The JPM task would normally be assigned in the OSC; therefore 3 minutes were added on to the JPM Estimated Time to account for the transient time between the OSC and the R&S Line location
High Containment Pool Level Protective Actions JPM Number: JPM222 Revision Number: 02 Task Number and Title: 441105.01 High Containment Pool Level Protective Actions K/A System K/A Number Importance (RO/SRO) 295029 2.4.35 3.8 4.0 Knowledge of local auxiliary operator tasks during an emergency and the resultant operational effects.
Suggested Testing Environment:
Plant Actual Testing Environment:
&#xa3; Simulator &#xa2; Plant &#xa3; Control Room Testing Method:
&#xa2; Simulate Alternate Path:
&#xa3; Yes &#xa2; No   &#xa3; Perform SRO Only: &#xa3; Yes &#xa2; No Time Critical:
&#xa3; Yes &#xa2; No Estimated Time to Complete: 18 minutes Actual Time Used:   minutes *The JPM task would normally be assigned in the OSC; therefore 3 minutes were added on to the JPM Estimated Time to account for the transient time between the OSC and the R&S Line location


==References:==
==References:==
 
CPS No. 4411.05 Rev 4b, High Containment Pool Level Protective Actions.
CPS No. 4411.05 Rev 4b, High Containment Pool Level Protective Actions. EVALUATION  
EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                 &#xa3; Yes       &#xa3; No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             &#xa3; Satisfactory             &#xa3; Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily? &#xa3; Yes &#xa3; No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:  
Evaluators Name:                                                              (Print)
&#xa3; Satisfactory
Evaluators Signature:                                                              Date:
&#xa3; Unsatisfactory Comments:
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            Page 12 of 13


Evaluator's Name:    (Print)
Evaluator's Signature:  Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 13 of 13  INITIAL CONDITIONS:
INITIAL CONDITIONS:
The decision has been made to flood the Primary Containment. Current level in the Primary Containment is 22
The decision has been made to flood the Primary Containment. Current level in the Primary Containment is 22 5 and rising at ~1 every 5 minutes.
&#xa2; 5&#xb2; and rising at ~1" every 5 minutes.
INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed.  
CAUTION
&sect; No equipment or controls will be manipulated during this evaluation, only Simulated actions will occur.
              &sect;   All pre-job briefings are completed.
&sect; Do NOT shine any type light into a panel. You are directed to deenergize electrical loads per CPS No. 4411.05 High Containment Pool Level Protective Actions, Table 1, Section 2, OUTSIDE MCR. Report to the CRS after completing the task.
              &sect;   No equipment or controls will be manipulated during this evaluation, only Simulated actions will occur.
              &sect;   Do NOT shine any type light into a panel.
You are directed to deenergize electrical loads per CPS No. 4411.05 High Containment Pool Level Protective Actions, Table 1, Section 2, OUTSIDE MCR.
Report to the CRS after completing the task.
Page 13 of 13
 
CLINTON POWER STATION Job Performance Measure Startup the Fuel Building HVAC VF System to support Emergency Containment Venting JPM Number: JPM431 Revision Number: 02 Date: 9/19/16 Developed By:          T. Jennings                      9/19/16 Instructor                        Date Validated By:        Matt Baker                        10/27/16 SME or Instructor                Date Reviewed By:          Jim Lucas                        11/15/16 Operations Representative        Date Approved By:          T. Jennings                      11/15/16 Training Department              Date JPM431_R2 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111


JPM431_R2 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure Startup the Fuel Building HVAC VF System to support Emergency Containment Venting JPM Number: JPM431 Revision Number: 0 2 Date:  9/19/16 Developed By:
JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)
T. Jennings 9/19/16  Instructor Date  Validated By: Matt Baker 10/27/16  SME or Instructor Date  Reviewed By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Jim Lucas  11/15/16  Operations Representative Date  Approved By:
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
T. Jennings 11/15/16  Training Department Date JPM Number:  JPM431  - rev 0 2  Clinton Power Station Job Performance Measure (JPM)
________     a)   Task description and number, JPM description and number are identified.
Page 2 of 13 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________     b)   Knowledge and Abilities (K/A) references are included.
________ a) Task description and number, JPM description and number are identified. ________ b)
________     c)   Performance location specified. (in-plant, control room, simulator, or other)
Knowledge and Abilities (K/A) references are included.
________     d)   Initial setup conditions are identified.
________ c) Performance location specified. (in-plant, control room, simulator, or other) ________ d)
________     e)   Initiating cue (and terminating cue if required) are properly identified.
Initial setup conditions are identified.
________     f)   Task standards identified and verified by SME review.
________ e) Initiating cue (and terminating cue if required) are properly identified.
________     g)   Critical steps meet the criteria for critical steps and are identified with an asterisk
________ f) Task standards identified and verified by SME review.
(*).
________ g) Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ h)
________     h)   Verify the procedure(s) referenced by this JPM reflects the current revision:
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure CPS 3404.01               Rev: 13e Procedure                           Rev:
Procedure CPS 3404.01 Rev: 13e Procedure Rev:   Procedure Rev:   ________ i) Verify cues both verbal and visual are free of conflict.
Procedure                           Rev:
________ j) Verify performance time is accurate
________     i)   Verify cues both verbal and visual are free of conflict.
________ k)
________     j)   Verify performance time is accurate
If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ l) When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:  
________     k)   If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     l)   When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date Page 2 of 13


SME / Instructor Date SME / Instructor Date SME / Instructor Date JPM Number: JPM431 - rev 0 2  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 13 Revision Record (Summary)
Revision Record (Summary)
Revision Date Description 00 7/28/10 New JPM. 01 6/14/14 Updated to new JPM template and updated procedure revisions.
Revision Date                           Description 00     7/28/10 New JPM.
02 9/19/16 Updated procedure references.
01     6/14/14 Updated to new JPM template and updated procedure revisions.
02     9/19/16 Updated procedure references.
Page 3 of 13


JPM Number: JPM431 - rev 0 2  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 4 of 13 Simulator Setup Instructions
Simulator Setup Instructions
: 1. This is an in-plant JPM and requires no simulator setup..  
: 1. This is an in-plant JPM and requires no simulator setup..
Page 4 of 13


JPM Number: JPM431 - rev 0 2  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 13 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
TASK STANDARDS:
* The Fuel Building HVAC system is in operation IAW CPS No. 3404.01 Fuel Building HVAC (VF) TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* The Fuel Building HVAC system is in operation IAW CPS No. 3404.01 Fuel Building HVAC (VF)
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* None PROCEDURAL/
* None PROCEDURAL/


Line 3,239: Line 3,207:
* Provide the examinee with a copy of CPS 3404.01 Fuel Building HVAC (VF) when providing the initiating cue.
* Provide the examinee with a copy of CPS 3404.01 Fuel Building HVAC (VF) when providing the initiating cue.
* Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.  
* All pre-job briefings are completed.
Page 5 of 13


JPM Number: JPM431 - rev 0 2  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 13  INITIAL CONDITIONS:
INITIAL CONDITIONS:
A condition exists which requires Emergency Venting of the Containment. VF System is shutdown IAW CPS 3404.01 FUEL BUILDING HVAC (VF) section 8.3 Shutdown. The Standby Gas Treatment System (VG) is shut down.
A condition exists which requires Emergency Venting of the Containment.
VF System is shutdown IAW CPS 3404.01 FUEL BUILDING HVAC (VF) section 8.3 Shutdown.
The Standby Gas Treatment System (VG) is shut down.
EOP checklist CPS No. 4410.00C011, DEFEATING LOW RPV WATER LEVEL AND HIGH DRYWELL PRESSURE FUEL BUILDING VENTILATION ISOLATIONS, has been completed.
EOP checklist CPS No. 4410.00C011, DEFEATING LOW RPV WATER LEVEL AND HIGH DRYWELL PRESSURE FUEL BUILDING VENTILATION ISOLATIONS, has been completed.
INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed. The CRS has directed you to restart the Fuel Building HVAC system to support the venting process per the normal startup section of CPS 3404.01 FUEL BUILDING HVAC (VF), section 8.1.7. MCR actions per steps 8.1.1 through 8.1.6 are complete. Report to the CRS after completing the task. START TIME:
CAUTION
              &sect;   All pre-job briefings are completed.
The CRS has directed you to restart the Fuel Building HVAC system to support the venting process per the normal startup section of CPS 3404.01 FUEL BUILDING HVAC (VF), section 8.1.7.
MCR actions per steps 8.1.1 through 8.1.6 are complete.
Report to the CRS after completing the task.
START TIME:
Page 6 of 13


JPM Number: JPM431 - rev 0 2  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 7 of 13 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 3404.01 FUEL BUILDING HVAC (VF)
PERFORMANCE STEPS CPS 3404.01 FUEL BUILDING HVAC (VF)
*8.1.7.1 For all available Exhaust/Supply fan(s):
        *8.1.7.1   For all available Exhaust/Supply fan(s):
a)   Place 1VF04CA, Exhaust Fan H/S [1HS
a)   Place 1VF04CA, Exhaust Fan H/S [1HS-VF005] to AFTER-STOP.
-VF005] to AFTER-STOP. b) Place 1VF04CB, Exhaust Fan H/S [1HS
b)   Place 1VF04CB, Exhaust Fan H/S [1HS-VF006] to AFTER-STOP.
-VF006] to AFTER
c)   Place 1VF03CA, Supply Fan H/S [1HS-VF002] to AFTER-STOP.
-STOP. c) Place 1VF03CA, Supply Fan H/S [1HS
d)   Place 1VF03CB, Supply Fan H/S [1HS-VF003] to AFTER-STOP.
-VF002] to AFTER
Standard:           Examinee locates the control switches for 1VF04CA, 4CB, 3CA, and 3CB at 1PL44J and simulates taking each control switch out of PTL and into AFTER-STOP.
-STOP. d) Place 1VF03CB, Supply Fan H/S [1HS
Cue:               The components are in the position youve described.
-VF003] to AFTER
Comments SAT &#xa3;               UNSAT &#xa3;                 Comment Number Page 7 of 13
-STOP. Standard: Examinee locates the control switches for 1VF04CA, 4CB, 3CA, and 3CB at 1PL44J and simulates taking each control switch out of PTL and into AFTER-STOP. Cue: The components are in the position you've described. Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number  
 
JPM Number:  JPM431  - rev 0 2  Clinton Power Station Job Performance Measure (JPM)
Page 8 of 13 *8.1.7.2 Start 1VF04CA(CB), Exhaust Fan [1HS-VF005(006)]. Observe the following:
a) 1VF11YA(YB), Exh Fan Disch Dmpr opens.
b) Fuel Bldg Average Pressure (1PDI-VF035B) begins to go negative. Standard: Examinee locates control switches for 1VF04CA or 1VF04CB, simulates turning the respective control switch 1HS-VF005 or 1HS-VF 006 clockwise to the START position and then releases. 


JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)
      *8.1.7.2 Start 1VF04CA(CB), Exhaust Fan [1HS-VF005(006)].
Observe the following:
a)    1VF11YA(YB), Exh Fan Disch Dmpr opens.
b)    Fuel Bldg Average Pressure (1PDI-VF035B) begins to go negative.
Standard:      Examinee locates control switches for 1VF04CA or 1VF04CB, simulates turning the respective control switch 1HS-VF005 or 1HS-VF006 clockwise to the START position and then releases.
Examinee verifies the following:
Examinee verifies the following:
* 1VF04CA(B) RED light ON and GREEN light OFF.
* 1VF04CA(B) RED light ON and GREEN light OFF.
* 1VF11YA(YB) RED light ON and GREEN light OFF.
* 1VF11YA(YB) RED light ON and GREEN light OFF.
* Verifies 1PDI-VF035B moves in the negative direction. Cue: If the examinee asks which set of supply and/or exhaust fans to start, cue him/her that the MCR has no preference on which fans are started.
* Verifies 1PDI-VF035B moves in the negative direction.
Cue:           If the examinee asks which set of supply and/or exhaust fans to start, cue him/her that the MCR has no preference on which fans are started.
When the exhaust fan is started, cue the indicator needle (with an ink pen or similar device) on 1PDI-VF035B trending slowly in the negative direction.
When the exhaust fan is started, cue the indicator needle (with an ink pen or similar device) on 1PDI-VF035B trending slowly in the negative direction.
Cue the examinee that components and indications are as you've described. Comments If checked INITIALLY, 1PDI-VF035B reads 0 inches water.
Cue the examinee that components and indications are as youve described.
SAT   &#xa3; UNSAT   &#xa3; Comment Number  
Comments       If checked INITIALLY, 1PDI-VF035B reads 0 inches water.
SAT &#xa3;               UNSAT &#xa3;               Comment Number Page 8 of 13


JPM Number: JPM431 - rev 0 2  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)
Page 9 of 13  *8.1.7.3 WHEN Fuel Bldg Average Pressure reaches  
      *8.1.7.3 WHEN Fuel Bldg Average Pressure reaches -0.5 H2O, THEN Start 1VF03CA(CB), Supply Fan [1HS-VF002(003)].
-0.5" H2O, THEN Start 1VF03CA(CB), Supply Fan [1HS-VF002(003)].
Observe the following:
Observe the following:
a) 1VF02YA(YB), Supply Fan Disch Dmpr opens.
a)   1VF02YA(YB), Supply Fan Disch Dmpr opens.
b) 1VF01Y, Supply Fan Intake Dmpr opens.
b)   1VF01Y, Supply Fan Intake Dmpr opens.
c) Fuel Bldg Average Pressure steadies out at ~  
c)   Fuel Bldg Average Pressure steadies out at ~ -0.7 inches water (1PDI-VF035B)
-0.7 inches water (1PDI
Standard:       Examinee locates control switches for 1VF03CA or 1VF03CB, simulates turning the respective control switch 1HS-VF002 or 1HS-VF003 clockwise to the START position and then releases.
-VF035B) Standard: Examinee locates control switches for 1VF03CA or 1VF03CB, simulates turning the respective control switch 1HS-VF002 or 1HS-VF00 3 clockwise to the START position and then releases.
Examinee verifies the following:
Examinee verifies the following:
* 1VF03CA(B) RED light ON and GREEN light OFF.
* 1VF03CA(B) RED light ON and GREEN light OFF.
* 1VF02YA(YB) RED light ON and GREEN light OFF.
* 1VF02YA(YB) RED light ON and GREEN light OFF.
* Verifies 1VF01Y RED light ON and GREEN light OFF.
* Verifies 1VF01Y RED light ON and GREEN light OFF.
* 1PDI-VF035B steadies out at -0.7 inches water. Cue: After the VF supply fan has been started, cue the indicator needle on 1PDI-VF035B trending slowly in the negative direction and then steadying out at  
* 1PDI-VF035B steadies out at -0.7 inches water.
~ -0.7 inches water.
Cue:           After the VF supply fan has been started, cue the indicator needle on 1PDI-VF035B trending slowly in the negative direction and then steadying out at ~ -0.7 inches water.
Cue the examinee that components and indications are as you've described.
Cue the examinee that components and indications are as youve described.
Comments   SAT   &#xa3; UNSAT   &#xa3; Comment Number  
Comments SAT &#xa3;             UNSAT &#xa3;               Comment Number Page 9 of 13
 
JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM) 8.1.7.4 4)    IF Needed to maintain building temperature, THEN Place Heater, 1VF02A, H/S to ON (1HS-VF028).
Standard:      No action required.
Cue:            If examinee asks whether to energize heater 1VF02A, respond as MCR Do NOT start building heater.
Comments SAT &#xa3;              UNSAT &#xa3;                  Comment Number 8.1.8 Place/verify 1RIX-PR019, Fuel Bldg CAM (EOP-8 Monitor) in NORMAL per CPS 3315.03, Radiation Monitoring (AR/PR).
Standard:      No action required (MCR Action).
Cue:            May contact RP or MCR to perform this action.
Comments SAT &#xa3;              UNSAT &#xa3;                  Comment Number 8.1.9 Following system stabilization, position supply and exhaust fan switches to agree with running and standby status of the respective fan(s) (red flag/green flag).
Standard:      No action required; switch positions should be in agreement with the running and standby status of each fan.
Cue:
Comments SAT &#xa3;              UNSAT &#xa3;                  Comment Number Page 10 of 13
 
JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)
TERMINATING CUES:
Fuel Building HVAC is in service IAW CPS No. 3404.01 FUEL BUILDING HVAC (VF).
STOP TIME:
Page 11 of 13
 
JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
 
==Title:==
&#xa3; EO              &#xa3; RO                &#xa3; SRO            &#xa3; STA          &#xa3; SRO Cert JPM


JPM Number: JPM431  - rev 0 2  Clinton Power Station Job Performance Measure (JPM)
==Title:==
Page 10 of 13  8.1.7.4 4)  IF Needed to maintain building temperature,  THEN Place Heater, 1VF02A, H/S to ON (1HS-VF028). Standard: No action required. Cue: If examinee asks whether to energize heater 1VF02A, respond as MCR "Do NOT start building heater". Comments  SAT  &#xa3; UNSAT  &#xa3; Comment Number 8.1.8 Place/verify 1RIX-PR019, Fuel Bldg CAM (EOP-8 Monitor) in NORMAL per CPS 3315.03, Radiation Monitoring (AR/PR). Standard: No action required (MCR Action). Cue: May contact RP or MCR to perform this action. Comments  SAT  &#xa3; UNSAT  &#xa3; Comment Number 8.1.9 Following system stabilization, position supply and exhaust fan switches to agree with running and standby status of the respective fan(s) (red flag/green flag).
Startup the Fuel Building HVAC VF System to support Emergency Containment Venting JPM Number:       JPM431                                                       Revision Number: 02 Task Number and
Standard: No action required; switch positions should be in agreement with the running and standby status of each fan. Cue:  Comments  SAT  &#xa3; UNSAT  &#xa3; Comment Number JPM Number: JPM431 - rev 0 2  Clinton Power Station Job Performance Measure (JPM)
Page 11 of 13  TERMINATING CUES:
Fuel Building HVAC is in service IAW CPS No.
3404.01 FUEL BUILDING HVAC (VF). STOP TIME: 


JPM Number:  JPM431  - rev 0 2  Clinton Power Station Job Performance Measure (JPM)
==Title:==
SRRS: 3D.105 (when utilized for operator initial or continuing training)      Page 12 of 13 Operator's Name:
340401.01 Start up of the VF system.
Job Title:  
K/A System         K/A Number                     Importance (RO/SRO) 288000               A2.03                     3.5                 3.7 Ability to (a) predict the impacts of the following on the PLANT VENTILATION SYSTEMS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of coolant accident: Plant-Specific Suggested Testing Environment:                 Plant Actual Testing Environment:               &#xa3; Simulator             &#xa2; Plant         &#xa3; Control Room Testing Method:         &#xa2; Simulate                     Alternate Path:       &#xa3; Yes       &#xa2; No
&#xa3;  EO &#xa3;  RO &#xa3;  SRO &#xa3;  STA &#xa3;  SRO Cert JPM Title: Startup the Fuel Building HVAC VF System  to support Emergency Containment Venting JPM Number: JPM431 Revision Number: 02 Task Number and Title: 340401.01 Start up of the VF system. K/A System K/A Number Importance (RO/SRO) 288000 A2.03 3.5 3.7 Ability to (a) predict the impacts of the following on the PLANT VENTILATION SYSTEMS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of coolant accident: Plant-Specific Suggested Testing Environment:
                          &#xa3; Perform                           SRO Only:       &#xa3; Yes       &#xa2; No Time Critical:       &#xa3; Yes           &#xa2; No Estimated Time to Complete:           15 minutes                 Actual Time Used:             minutes
Plant Actual Testing Environment:
&#xa3; Simulator &#xa2;   Plant &#xa3; Control Room Testing Method:
&#xa2; Simulate Alternate Path:
&#xa3; Yes &#xa2; No   &#xa3; Perform SRO Only: &#xa3; Yes &#xa2; No Time Critical:
&#xa3; Yes &#xa2; No Estimated Time to Complete: 15 minutes Actual Time Used:   minutes  


==References:==
==References:==
Line 3,314: Line 3,306:


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                 &#xa3; Yes       &#xa3; No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             &#xa3; Satisfactory             &#xa3; Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                              (Print)
&#xa3; Yes &#xa3; No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:  
Evaluators Signature:                                                              Date:
&#xa3; Satisfactory
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            Page 12 of 13
&#xa3; Unsatisfactory Comments:


Evaluator's Name:    (Print)
Evaluator's Signature:  Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 13 of 13  INITIAL CONDITIONS:
INITIAL CONDITIONS:
A condition exists which requires Emergency Venting of the Containment. VF System is shutdown IAW CPS 3404.01 FUEL BUILDING HVAC (V F) section 8.3 Shutdown. The Standby Gas Treatment System (VG) is shut down.
A condition exists which requires Emergency Venting of the Containment.
VF System is shutdown IAW CPS 3404.01 FUEL BUILDING HVAC (VF) section 8.3 Shutdown.
The Standby Gas Treatment System (VG) is shut down.
EOP checklist CPS No. 4410.00C011, DEFEATING LOW RPV WATER LEVEL AND HIGH DRYWELL PRESSURE FUEL BUILDING VENTILATION ISOLATIONS, has been completed.
EOP checklist CPS No. 4410.00C011, DEFEATING LOW RPV WATER LEVEL AND HIGH DRYWELL PRESSURE FUEL BUILDING VENTILATION ISOLATIONS, has been completed.
INITIATING CUE:
INITIATING CUE:
CAUTION &sect; All pre-job briefings are completed. The CRS has directed you to restart the Fuel Building HVAC system to support the venting process per the normal startup section of CPS 3404.01 FUEL BUILDING HVAC (VF), section 8.1.7. MCR actions per steps 8.1.1 through 8.1.6 are complete.
CAUTION
              &sect;   All pre-job briefings are completed.
The CRS has directed you to restart the Fuel Building HVAC system to support the venting process per the normal startup section of CPS 3404.01 FUEL BUILDING HVAC (VF), section 8.1.7.
MCR actions per steps 8.1.1 through 8.1.6 are complete.
Report to the CRS after completing the task.
Report to the CRS after completing the task.
Page 13 of 13


ILT 15-1 NRC Exam Scenario 1 Rev. 0 ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 1 of 19  Exelon Nuclear ILT 15-1 NRC Exam  
ILT 15-1 NRC Exam Scenario 1                                                             Rev. 0 Exelon Nuclear ILT 15-1 NRC Exam Scenario Number:
NRC Exam Scenario 1 Revision Number: 0 Date: 10/28/16 Developed By:                    T. Jennings                  10/28/16 Instructor              Date Validated By:                    Michael Antonelli            10/28/16 SME or Instructor            Date Reviewed By:                      Jim Lucas                    11/15/16 Operations Representative        Date Approved By:                      T. Jennings                  11/15/16 Training Department            Date ILT 15-1 NRC Exam Scenario 1 Facility Approved        Page 1 of 19


Scenario Number:  NRC Exam Scenario 1 Revision Number: 0 Date: 10/28/16
ILT 15-1 NRC Exam Scenario 1                                                                           Rev. 0 Appendix D                                               Scenario Outline                               Form ES-D-1 Facility: Clinton Power Station                   Scenario No.: 1             Operating Test No.: 2017-301 Examiners: ____________________________                                     Operators: ____________________
 
Developed By:
T. Jennings 10/2 8/16  Instructor Date  Validated By:
Michael Antonelli 10/28/16  SME or Instructor Date  Reviewed By:
Jim Lucas  11/15/16  Operations Representative Date  Approved By:
T. Jennings 11/15/16  Training Department Date ILT 15-1 NRC Exam Scenario 1 Rev. 0 ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 2 of 19 Appendix D Scenario Outline Form ES-D-1   Facility:
Clinton Power Station Scenario No.:
1                       Operating Test No.:
2017-301   Examiners: ____________________________
Operators: ____________________
____________________________                                                      ____________________
 
____________________________
____________________
Initial Conditions:
Initial Conditions:
Mode 1 at  
* Mode 1 at ~78% power to support performance of CPS 9031.07 Main Turbine Control Valve Tests on the next shift.
~78% power to support performance of CPS 9031.07 Main Turbine Control Valve Tests on the next shift. Thunderstorms are expected in the area within the next hour.
* Thunderstorms are expected in the area within the next hour.
CY Pump 'B' (0CY01PB) is OOS for maintenance. Not expected back this shift.
* CY Pump B (0CY01PB) is OOS for maintenance. Not expected back this shift.
CPS 9080.03 DG 1C Operability - Manual and Quick Start Operability is in progress
* CPS 9080.03 DG 1C Operability - Manual and Quick Start Operability is in progress. DG 1C is running in parallel with RAT B.
. DG 1C is running in parallel with RAT 'B'.
Turnover:
Turnover:
Priorities for the shift are as follows: Secure Division 3 Diesel Generator (DG 1C) per CPS 9080.03 DG 1C Operability - Manual and Quick Start Operability, starting at step 8.2.16 - First Priority
* Priorities for the shift are as follows:
. CPS 9082.01 Offsite Source Power Verification was completed one (1) hour ago.
* Secure Division 3 Diesel Generator (DG 1C) per CPS 9080.03 DG 1C Operability - Manual and Quick Start Operability, starting at step 8.2.16 - First Priority. CPS 9082.01 Offsite Source Power Verification was completed one (1) hour ago.
Maintain power at 78% throughout the shift.
* Maintain power at 78% throughout the shift.
Event No. Malf. No. Event Type* Event Description 1 N/A N-BOP Secure DG 1C 2 YP_XMFTB_3986 A05_A02_A104_3_TVM A05_A02_A105_3_TVM A05_A02_A106_3_TVM TS-SRO DG 1C Overspeeds When Unloaded 3 A02_A05_01_7_TVM=2 C-ATC CRD high temperature 4 CAM0PR001IA_PUMP to 1 CAM0PR001TV_VALUE15 to 0 C-BOP TS-SRO Failure of 0RIX-PR001 Ch 15 - Low flow due to sample pump failure 5 A01_A02_01_8_TVM C-ATC Clogged oil filter Condensate Booster Pump 'A' 6 YPXMALSE_77 to 50 C-BOP Inadvertent opening of a SRV 7 YFFWPPSS_11 YAFWPPDE_9 R-ATC Loss of CY - Rapid Plant Shutdown 8 RAT_B_OVERCURRENT YARIMVFP_2 = 0 ED17B221C1FO YPXMALSE_511 M-All LOCA/RAT trip/E51-F013 Failure/Div 3 ERAT Feed Breaker Failure/TAF Blowdown 9 YP_XMFTB_4106 lp11acld001fsp=True C-BOP LPCS Fails To Auto Start LPCS Injection Valve 1E21F005 Fails to Auto Open at 472 psig RPV pressure
Event                   Malf. No.                       Event                          Event No.                                                      Type*                       Description 1                         N/A                         N-BOP     Secure DG 1C 2               YP_XMFTB_3986                         TS-SRO     DG 1C Overspeeds When Unloaded A05_A02_A104_3_TVM A05_A02_A105_3_TVM A05_A02_A106_3_TVM 3           A02_A05_01_7_TVM=2                       C-ATC     CRD high temperature 4         CAM0PR001IA_PUMP to 1                       C-BOP     Failure of 0RIX-PR001 Ch 15 - Low flow due TS-SRO      to sample pump failure CAM0PR001TV_VALUE15 to 0 5             A01_A02_01_8_TVM                         C-ATC     Clogged oil filter Condensate Booster Pump A
* (N)ormal,    (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor
6             YPXMALSE_77 to 50                       C-BOP     Inadvertent opening of a SRV 7               YFFWPPSS_11                           R-ATC     Loss of CY - Rapid Plant Shutdown YAFWPPDE_9 8           RAT_B_OVERCURRENT                           M-All     LOCA/RAT trip/E51-F013 Failure/Div 3 ERAT YARIMVFP_2 = 0                                    Feed Breaker Failure/TAF Blowdown ED17B221C1FO YPXMALSE_511 9                                                                 LPCS Fails To Auto Start YP_XMFTB_4106 C-BOP LPCS Injection Valve 1E21F005 Fails to Auto lp11acld001fsp=True Open at 472 psig RPV pressure
  *         (N)ormal,    (R)eactivity,     (I)nstrument,   (C)omponent,   (M)ajor ILT 15-1 NRC Exam Scenario 1 Facility Approved      Page 2 of 19


ILT 15-1 NRC Exam Scenario 1 Rev. 0 ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 3 of 19 Appendix D Scenario Outline Form ES-D-1   Scenario No.:
ILT 15-1 NRC Exam Scenario 1                                                                     Rev. 0 Appendix D                                       Scenario Outline                                   Form ES-D-1 Scenario No.:     1                                                                     Operating Test No.: 2017-301 Narrative Summary Event #                                             Description
1                           Operating Test No.:
: 1. Secure DG 1C Division 3 DG is running in parallel with RAT B IAW CPS 9080.03, Diesel Generator 1C Operability -
2017-301 Narrative Summary Event # Description
Manual and Quick Start Operability. Following shift turnover, the SRO will direct the BOP operator to unload and secure DG 1C and place it back in standby.
: 1. Secure DG 1C Division 3 DG is running in parallel with RAT 'B' IAW CPS 9080.0 3 , Diesel Generator 1C Operability - Manual and Quick Start Operability.
: 2. DG 1C Overspeeds When Unloaded When the BOP opens the output breaker for DG 1C in event 1, annunciators 5062-2C TRIP/LOCKOUT DIESEL GEN 1C, 5062-4C OVERSPEED DIESEL GEN 1C, 5062-5C TRIPPED DIESEL GEN 1C ENGINE and 5062-6C TROUBLE DIESEL GEN 1C come in due to an overspeed trip of the Div 3 DG.
Following shift turnover, the SRO will direct the BOP operator to unload and secure DG 1C and place it back in standby. 2. DG 1C Overspeeds When Unloaded When the BOP opens the output breaker for DG 1C in event 1, annunciators 5062-2C TRIP/LOCKOUT DIESEL GEN 1C, 50 62-4C OVERSPEED DIESEL GEN 1C, 5062
The overspeed trip will result in a lockout of the Div 3 DG, rendering the DG inoperable and unavailable.
-5C TRIPPED DIESEL GEN 1C ENGINE and 5062
The field operator stationed in the Div 3 DG Room will confirm MCR indications. Technical Specification 3.8.1 Condition B (one required DG inoperable) will be entered and appropriate actions taken.
-6C TROUBLE DIESEL GEN 1C come in due to an overspeed trip of the Div 3 DG. The overspeed trip will result in a lockout of the Div 3 DG, rendering the DG inoperable and unavailable. The field operator stationed in the Div 3 DG Room will confirm MCR indications. Technical Specification 3.8.1 Condition B (one required DG inoperable) will be entered and appropriate actions taken.
: 3. CRD high temperature Annunciator 5006-1G CRD HYDR TEMP HI is received. The ATC operator will dispatch a field operator to the local recorder on 1H22-P007 to determine rod 52-25 is alarming. The ATC operator will note that rod 52-25 is currently at position 48 and IAW CPS 3304.01 Control Rod Hydraulic & Control (RD) perform an extended coupling check. The annunciator will clear for ~ 30 seconds and then alarm again. The ATC operator will then insert rod 52-25 to position 46 which will clear the high temperature condition.
: 3. CRD high temperature Annunciator 5006
: 4. Failure of 0RIX-PR001 Ch 15 - Low flow due to sample pump failure A channel (15) trouble - flow out of limit is received on the MCR AR/PR LAN for 0RIX-PR001 HVAC Exhaust Stack PRM #1. The BOP will identify a low flow condition. The SRO will declare 0RIX-PR001 inoperable and enter ODCM 3.2.2 Conditions A and C. The SRO will direct the BOP to place 0RIX-PR002 in service and exit ODCM actions.
-1G CRD HYDR TEMP HI is received.
: 5. Clogged Oil Filter Condensate Booster Pump A Annunciator 5001-1H CLOGGED OIL FILTER CB PUMP 1A will be received. An Equipment Operator will be dispatched to turn the CUNO filter handle several times in an attempt to clear the alarm, but will be unsuccessful. The SRO will direct the ATC to start a non-running Condensate Booster Pump and secure CB Pump 1A per CPS 3104.01 Condensate/Condensate Booster (CD/CB), section 8.2.2 Starting Additional/Shifting Condensate Booster Pumps.
T he ATC operator will dispatch a field operator to the local recorder on 1H22
: 6. Inadvertent opening of a SRV Annunciators 5066-5B ADS OR SAFETY RELIEF VALVE LEAKING and 5067-8L SRV MONITORING SYSTEM TROUBLE come in due to SRV 1B21-F041G failing ~ 50 % open. The BOP operator will diagnose and determine the problem is with 1B21-F041G. The SRO will direct the BOP operator to sound the containment evacuation alarm and coordinate with the ATC and attempt to close the SRV IAW CPS 4009.01 Inadvertent Opening Safety/Relief Valve. The SRO will enter and execute CPS 4005.01 Loss of Feedwater Heating and direct the ATC to restore and maintain reactor power at or below the original power level. SRV 1B21-F041G will shut when the first fuse is simulated removed for the associated A solenoid at 1H13-P661.
-P007 to determine rod 52
: 7. Loss of CY - Rapid Plant Shutdown The scenario starts with the B CY Pump out of service. In this event the shaft shears on the running CY Pump (0CY01PC). The BOP operator will start the A CY Pump and secure the C CY Pump. However, the A CY pump capacity begins to degrade and annunciator 5014-2B Low Press Cycle Cond Xfer Pump Disch Hdr will be received. Due to the complete loss of CY system pumps, the crew will perform a Rapid Plant Shutdown and attempt to scram the reactor per CPS 3208.01 Cycled / Makeup Condensate (CY/MC).
-25 is alarming. The ATC operator will note that rod 52-25 is currently at position 48 and IAW CPS 3304.01 Control Rod Hydraulic & Control (RD) perform an extended coupling check. The annunciator will clear for ~ 30 seconds and then alarm again. The ATC operator will then insert rod 52
ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 3 of 19
-25 to position 46 which will clear the high temperature condition.
: 4. Failure of 0RIX
-PR001 Ch 15 - Low flow due to sample pump failure A channel (15) trouble - flow out of limit is received on the MCR AR/PR LAN for 0RIX
-PR001 HVAC Exhaust Stack PRM #1. The BOP will identify a low flow condition. The SRO will declare 0RIX
-PR001 inoperable and enter ODCM 3.2.2 Conditions A and C. The SRO will direct the BOP to place 0RIX
-PR002 in service and exit ODCM actions. 5. Clogged O il Filter Condensate Booster Pump 'A' Annunciator 5001
-1H CLOGGED O IL FILTER CB PUMP 1A will be received. An Equipment Operator will be dispatched to turn the CUNO filter handle several times in an attempt to clear the alarm, but will be unsuccessful. The SRO will direct the ATC to start a non
-running Condensate Booster Pump and secure CB Pump 1A per CPS 3104.01 Condensate/Condensate Booster (CD/CB), section 8.2.2 Starting Additional/Shifting Condensate Booster Pumps
. 6. Inadvertent opening of a SRV Annunciators 5066-5B ADS OR SAFETY RELIEF VALVE LEAKING and 5067-8L SRV MONITORING SYSTEM TROUBLE come in due to SRV 1B21-F041G failing ~ 50 % open.
The BOP operator will diagnose and determine the problem is with 1B21
-F041G. The SRO will direct the BOP operator to sound the containment evacuation alarm and coordinate with the ATC and attempt to close the SRV IAW CPS 4009.01 Inadvertent Opening Safety/Relief Valve. The SRO will enter and execute CPS 4005.01 Loss of Feedwater Heating and direct the ATC to restore and maintain reactor power at or below the original power level. SRV 1B21
-F041G will shut when the first fuse is simulated removed for th e associated 'A' solenoid at 1H13
-P661. 7. Loss of CY - Rapid Plant Shutdown The scenario starts with the 'B' CY Pump out of service. In this event the shaft shears on the running CY Pump (0CY01PC). The BOP operator will start the 'A' CY Pump and secure the 'C' CY Pump. However, the 'A' CY pump capacity begins to degrade and annunciator 5014
-2B Low Press Cycle Cond Xfer Pump Disch Hdr will be received. Due to the complete loss of CY system pumps, the crew will perform a Rapid Plant Shutdown and attempt to scram the reactor per CPS 3208.01 Cycled / Makeup Condensate (CY/MC).
ILT 15-1 NRC Exam Scenario 1  Rev. 0  ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 4 of 19 Narrative Summary (cont.)  Event # Description
: 8. LOCA/RAT Trip/E51-F013 Failure/Div 3 ERAT Feed Breaker Failure/TAF Blowdown When the unit is scrammed in event 7, the Main Generator will trip on reverse power (normal post
-scram response). When Generator Output Gas Circuit Breaker (GCB) 4506 opens, a lockout of RAT 'B' results in a loss of non
-vital 4160 and 6900 volt power, resulting in a loss of Feedwater and Control Rod Drive as injection sources. Additionally, the ERAT Feed Breaker to 4160V Bus 1C1 fails to close, resulting in de
-energization of 4160V Bus 1C1 resulting in loss of HPCS as a feed source, and the RCIC injection valve will fail to open remotely and manually. This will complete the loss of all high pressure feed sources to the RPV. A LOCA will then commence, resulting in a loss of RPV inventory and causing DW pressure to increase. The LOCA will escalate, causing RPV level to fall to TAF, requiring an emergency depressurization to be performed (ADS fails to automatically initiate).
: 9. LPCS Fails To Auto Start
/ LPCS Injection Valve 1E21F005 Fails to Auto Open at 472 psig RPV pressure The Low Pressure Core Spray Pump will fail to auto start when DW pressure reaches 1.68 psig and will have to be manually started (critical task). In addition, 1E21
-F005 LPCS Injection Valve will fail to automatically open at 472 psig RPV pressure, requiring the injection valve to be manually opened to recover RPV level above TAF.
EOP 1, 3 , 6 Critical tasks:
RPV-1.1 Enter EOP
-3 and blowdown on a failure of the Automatic Depressurization System to automatically initiate within 17.5 minutes of RPV level reaching
-145.5 inches.
RPV-1.2 Maximize injection to restore water level above
-162" (TAF).
For this scenario, the magnitude of the leak is such that RPV water level will not recover above TAF if LPCS is not manually initiated within 17.5 minutes of RPV level reaching
-145.5 inches.


ILT 15-1 NRC Exam Scenario 1 Rev. 0 ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 5 of 19 Operator Actions Event No.(s):
ILT 15-1 NRC Exam Scenario 1                                                                     Rev. 0 Narrative Summary (cont.)
1  Page 1 of 1
Event #                                            Description
: 8. LOCA/RAT Trip/E51-F013 Failure/Div 3 ERAT Feed Breaker Failure/TAF Blowdown When the unit is scrammed in event 7, the Main Generator will trip on reverse power (normal post-scram response). When Generator Output Gas Circuit Breaker (GCB) 4506 opens, a lockout of RAT B results in a loss of non-vital 4160 and 6900 volt power, resulting in a loss of Feedwater and Control Rod Drive as injection sources. Additionally, the ERAT Feed Breaker to 4160V Bus 1C1 fails to close, resulting in de-energization of 4160V Bus 1C1 resulting in loss of HPCS as a feed source, and the RCIC injection valve will fail to open remotely and manually. This will complete the loss of all high pressure feed sources to the RPV. A LOCA will then commence, resulting in a loss of RPV inventory and causing DW pressure to increase. The LOCA will escalate, causing RPV level to fall to TAF, requiring an emergency depressurization to be performed (ADS fails to automatically initiate).
: 9. LPCS Fails To Auto Start / LPCS Injection Valve 1E21F005 Fails to Auto Open at 472 psig RPV pressure The Low Pressure Core Spray Pump will fail to auto start when DW pressure reaches 1.68 psig and will have to be manually started (critical task). In addition, 1E21-F005 LPCS Injection Valve will fail to automatically open at 472 psig RPV pressure, requiring the injection valve to be manually opened to recover RPV level above TAF.
EOP 1, 3, 6 Critical tasks:
* RPV-1.1 Enter EOP-3 and blowdown on a failure of the Automatic Depressurization System to automatically initiate within 17.5 minutes of RPV level reaching -145.5 inches.
* RPV-1.2 Maximize injection to restore water level above -162 (TAF). For this scenario, the magnitude of the leak is such that RPV water level will not recover above TAF if LPCS is not manually initiated within 17.5 minutes of RPV level reaching -145.5 inches.
ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 4 of 19


== Description:==
ILT 15-1 NRC Exam Scenario 1                                                                            Rev. 0 Operator Actions Event No.(s):              1                                                                            Page    1  of 1
Secure DG 1C Initiation: Following shift turnover and when directed by the Lead Examiner Cues: Directed by SRO Time Position Applicant's Actions or Behavior General Note on Requirements for "Expected Annunciator Response"
 
- OP-AA-103-102 If this evolution was pre
==
-briefed and "Expected Alarms" were reviewed, the following expectations apply:
Description:==
  "Expected alarms" will be flagged When the annunciator comes in the operator will announce "Expected Alarm" The annunciator response procedure (ARP) need not be entered since it has already been reviewed in the pre
Secure DG 1C Initiation: Following shift turnover and when directed by the Lead Examiner Cues: Directed by SRO Time         Position                                       Applicants Actions or Behavior General Note on Requirements for Expected Annunciator Response - OP-AA-103-102 If this evolution was pre-briefed and Expected Alarms were reviewed, the following expectations apply:
-brief. If a pre-brief was not conducted the operator should perform the following:
* Expected alarms will be flagged
When an annunciator comes in the ARP should be referred to.
* When the annunciator comes in the operator will announce Expected Alarm
The annunciator may then be identified as an "Expected Alarm", flagged, and from that point on the ARP need not be referred to.
* The annunciator response procedure (ARP) need not be entered since it has already been reviewed in the pre-brief.
Key Parameter Response:
If a pre-brief was not conducted the operator should perform the following:
None Expected Annunciators:
* When an annunciator comes in the ARP should be referred to.
None Automatic Actions
* The annunciator may then be identified as an Expected Alarm, flagged, and from that point on the ARP need not be referred to.
: None ATC   Monitors reactor to ensure operations remain within established bands.
Key Parameter Response: None Expected Annunciators: None Automatic Actions: None ATC
o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
* Monitors reactor to ensure operations remain within established bands.
BOP o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
o     Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
Per CPS 9080.03, performs steps 8.2.16.2 - 8.2.16.4 to unload and secure DG 1C from surveillance (DG 1C will trip when the output breaker is opened in step 8.2.16.4): Slowly lowers DG 1C load to 100
BOP         o     Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
-200 KW using the DG 1C Governor Control Switch.
Per CPS 9080.03, performs steps 8.2.16.2 - 8.2.16.4 to unload and secure DG 1C from surveillance (DG 1C will trip when the output breaker is opened in step 8.2.16.4):
* Slowly lowers DG 1C load to 100-200 KW using the DG 1C Governor Control Switch.
o Adjusts DG 1C VARs to ~ 0 KVAR using the DG 1C Voltage Regulator Control Switch.
o Adjusts DG 1C VARs to ~ 0 KVAR using the DG 1C Voltage Regulator Control Switch.
Opens DG 1C Output Bkr, 1E22
* Opens DG 1C Output Bkr, 1E22-S001.
-S001. Reports DG 1C tripped to the SRO (annunciators 5062
* Reports DG 1C tripped to the SRO (annunciators 5062-2C, 4C, 5C, 6C).
-2C, 4C, 5C, 6C)
SRO
. SRO Directs actions listed above.
* Directs actions listed above.
Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
* Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
Terminus: DG 1C unloaded and tripped.
Terminus: DG 1C unloaded and tripped.
NOTES:  
NOTES:
* Solid bullets are required actions o    Hollow bullets are actions that may or may not be performed ILT 15-1 NRC Exam Scenario 1 Facility Approved      Page 5 of 19


Solid bullets are required actions o Hollow bullets are actions that may or may not be performed
ILT 15-1 NRC Exam Scenario 1                                                                             Rev. 0 Operator Actions Event No.(s):               2                                                                             Page     1 of   1
 
ILT 15-1 NRC Exam Scenario 1 Rev. 0 ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 6 of 19  Operator Actions Event No.(s):
2 Page 1 of 1
 
== Description:==


==
Description:==
DG 1C Overspeeds When Unloaded Initiation: When DG 1C Output Breaker is opened in Event 1.
DG 1C Overspeeds When Unloaded Initiation: When DG 1C Output Breaker is opened in Event 1.
Cues: Annunciators 5062
Cues: Annunciators 5062-2C TRIP/LOCKOUT DIESEL GEN 1C, 5062-4C OVERSPEED DIESEL GEN 1C, 5062-5C TRIPPED DIESEL GEN 1C ENGINE, 5062-6C TROUBLE DIESEL GEN 1C Time         Position                                         Applicants Actions or Behavior Key Parameter Response: None Expected Annunciators: 5062-2C, 5062-4C, 5062-5C, 5062-6C Automatic Actions: None ATC
-2C TRIP/LOCKOUT DIESEL GEN 1C, 5062
* Monitors reactor to ensure operations remain within established bands.
-4C OVERSPEED DIESEL GEN 1C, 5062
o     Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
-5C TRIPPED DIESEL GEN 1C ENGINE, 5062
o     Dispatches Equipment Operator to investigate.
-6C TROUBLE DIESEL GEN 1C Time Position Applicant's Actions or Behavior Key Parameter Response: None Expected Annunciators
BOP
: 5062-2C, 5062-4C, 5062-5C, 5062-6C Automatic Actions
* Reports receipt of annunciators 5062-2C, 4C, 5C, and 6C to the SRO.
: None ATC Monitors reactor to ensure operations remain within established bands.
* Refers to ARPs for 5062-2C, 4C, 5C, and 6C.
o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
o     Informs SRO to refer to CPS 4200.01 Loss of AC Power.
o Dispatch es Equipment Operator to investigate.
o     Informs SRO to refer to ITS 3.8.1, 3.8.2, and 3.8.3.
BOP Reports receipt of annunciators 5062
o     Informs SRO of possible need to notify Ameren of Div 3 DG UNAVAILABILITY.
-2C, 4C, 5C, and 6C to the SRO.
o     Dispatches Equipment Operator to investigate.
Refers to ARPs for 5062
* Acknowledges reports from ATC/BOP.
-2C, 4C, 5C, and 6C.
SRO
o Informs SRO to refer to CPS 4200.01 Loss of AC Power.
* Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
o Informs SRO to refer to ITS 3.8.1, 3.8.2, and 3.8.3.
o     Enters and executes CPS 4200.01 Loss of AC Power.
o Informs SRO of possible need to notify Ameren of Div 3 DG UNAVAILABILITY.
* Evaluates and enters ITS 3.8.1 AC Sources - Operating, Condition B Required Actions B.1, B.2, B.3.1 (or B.3.2), and B.4.
o Dispatch es Equipment Operator to investigate.
o     Informs Shift Manager.
SRO  Acknowledges reports from ATC/BOP.
o     Contacts Maintenance to investigate.
Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
o     Conducts a brief.
o Enters and executes CPS 4200.01 Loss of AC Power.
Terminus: ITS 3.8.1 evaluated.
Evaluates and enters ITS 3.8.1 AC Sources - Operating, Condition B Required Actions B.1, B.2, B.3.1 (or B.3.2), and B.4.
NOTES:
o Informs Shift Manager.
ILT 15-1 NRC Exam Scenario 1 Facility Approved       Page 6 of 19
o Contacts Maintenance to investigate.
o Conducts a brief.
Terminus: ITS 3.8.1 evaluated. NOTES:
 
ILT 15-1 NRC Exam Scenario 1  Rev. 0  ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 7 of 19 Operator Actions Event No.(s):
3  Page 1 of 1


== Description:==
ILT 15-1 NRC Exam Scenario 1                                                                            Rev. 0 Operator Actions Event No.(s):               3                                                                            Page    1    of  1


CRD high temperature Initiation: Following Event 2 and upon direction of the Lead Examiner, insert REMOTE 1. Cues: Annunciator 50 06-1G, CRD Hydr Temp Hi Time Position Applicant's Actions or Behavior Key Parameter Response
==
: CRD 52-25 operating temperature Expected Annunciators
Description:==
: 5006-1G, CRD Hyd r Temp Hi Automatic Actions
CRD high temperature Initiation: Following Event 2 and upon direction of the Lead Examiner, insert REMOTE 1.
: None ATC Reports issue to SRO. Refers to ARP.
Cues: Annunciator 5006-1G, CRD Hydr Temp Hi Time         Position                                         Applicants Actions or Behavior Key Parameter Response: CRD 52-25 operating temperature Expected Annunciators: 5006-1G, CRD Hydr Temp Hi Automatic Actions: None ATC
o Directs Field Operator to investigate.
* Reports issue to SRO.
Monitors reactor to ensure operations remain within established bands.
* Refers to ARP.
o     Directs Field Operator to investigate.
* Monitors reactor to ensure operations remain within established bands.
Per 3304.01, Control Rod Hydraulic & Control (RD):
Per 3304.01, Control Rod Hydraulic & Control (RD):
Determines CRD 52-25 is alarming.
* Determines CRD 52-25 is alarming.
Performs extended coupling check of rod 52-25 (10-15 seconds). Insert s control rod 52-25 to position 46.
* Performs extended coupling check of rod 52-25 (10-15 seconds).
BOP Monitors control room panels and notifies the SRO of any unusual or unexpected conditions.
* Inserts control rod 52-25 to position 46.
o Initiates an Issue Report and contacts the Reactor Engineer regarding the uncoupled rod event. SRO Acknowledges report from ATC. Directs actions listed above.
BOP
Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
* Monitors control room panels and notifies the SRO of any unusual or unexpected conditions.
o Informs Shift Manager.
o     Initiates an Issue Report and contacts the Reactor Engineer regarding the uncoupled rod event.
o Contacts Maintenance to investigate.
SRO
o Conducts a brief.
* Acknowledges report from ATC.
Terminus: Control rod 52-25 inserted to position 46. Annunciator 5006-1G clear NOTES:
* Directs actions listed above.
ILT 15-1 NRC Exam Scenario 1  Rev. 0  ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 8 of 19 Operator Actions Event No.(s):
* Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
4  Page 1 of 1
o     Informs Shift Manager.
o     Contacts Maintenance to investigate.
o     Conducts a brief.
Terminus: Control rod 52-25 inserted to position 46. Annunciator 5006-1G clear NOTES:
ILT 15-1 NRC Exam Scenario 1 Facility Approved       Page 7 of 19


== Description:==
ILT 15-1 NRC Exam Scenario 1                                                                                Rev. 0 Operator Actions Event No.(s):               4                                                                              Page    1  of 1


Failure of 0RIX
==
-PR001 Ch 15 - Low flow due to sample pump failure Initiation: Following Event 3 and upon direction of the Lead Examiner, insert REMOTE 2 Cues: MCR AR/PR LAN Alarm Time Position Applicant's Actions or Behavior Key Parameter Response
Description:==
: 0RIX-PR001 Channel 15 Flow Expected Annunciators
Failure of 0RIX-PR001 Ch 15 - Low flow due to sample pump failure Initiation: Following Event 3 and upon direction of the Lead Examiner, insert REMOTE 2 Cues: MCR AR/PR LAN Alarm Time         Position                                         Applicants Actions or Behavior Key Parameter Response: 0RIX-PR001 Channel 15 Flow Expected Annunciators: None Automatic Actions: None ATC
: None Automatic Actions
* Monitors reactor to ensure operations remain within established bands o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
: None ATC   Monitors reactor to ensure operations remain within established bands o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
BOP
BOP Reports issue to SRO.
* Reports issue to SRO.
Refers to the ARP.
* Refers to the ARP.
o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
Determines 0RIX
* Determines 0RIX-PR001 sample pump is OFF.
-PR001 sample pump is OFF.
Per CPS 3315.03, Radiation Monitoring section 8.4, places 0RIX-PR002 in service :
Per CPS 3315.03 , Radiation Monitoring section 8.4, places 0RIX
o Directs Chemistry to perform CY-CL-6954-01, HVAC Stack Effluent-Iodine and Particulate.
-PR002 in service : o Directs Chemistry to perform CY
o At Channel Status screen for monitor 0RIX-PR002 ;
-CL-6954-01, HVAC Stack Effluent
* Starts the pump by selecting ON under Pump Command.
-Iodine and Particulate.
* Verifies Channel 14 pressure is indicating < 14.9 psia AND is not DELETED.
o At Channel Status screen for monitor 0RIX-PR00 2 ; Starts the pump by selecting ON under Pump Command.
* Observes sample flow (Ch 15) stabilizes (53-57 LPM).
Verifies Channel 14 pressure is indicating < 14.9 psia AND is not DELETED. Observes sample flow (Ch 15) stabilizes (53
* Places 0RIX-PR002 in Normal by selecting NRML under Stdby Cmnd.
-57 LPM). Places 0RIX-PR00 2 in Normal by selecting NRML under Stdby Cmnd.
o At Channel Status screen for monitor to be placed in STANDBY (0RIX-PR001):
o At Channel Status screen for monitor to be placed in STANDBY (0RIX-PR001): Places monitor in STANDBY by selecting STBY under Stdby Cmnd.
* Places monitor in STANDBY by selecting STBY under Stdby Cmnd.
o Resets/verifies reset all alarms for 0RIX-PR002. Performs a channel check of monitor 0RIX-PR002 per CPS 9000.01, Control Room Surveillance Log
o Resets/verifies reset all alarms for 0RIX-PR002.
. SRO Acknowledge reports from BOP. Directs actions listed above.
* Performs a channel check of monitor 0RIX-PR002 per CPS 9000.01, Control Room Surveillance Log.
Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
SRO
Enters ODCM 3.2.2 Required Actions A.1, C.1 , C.2.2.1, C2.2.2, D.1, and D.2. o Contacts Maintenance to investigate.
* Acknowledge reports from BOP.
o Informs Shift Manager.
* Directs actions listed above.
o Conducts a brief.
* Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
Terminus: 0RIX-PR001 secured, 0RIX
* Enters ODCM 3.2.2 Required Actions A.1, C.1, C.2.2.1, C2.2.2, D.1, and D.2.
-PR002 started, tech specs evaluated. NOTES:
o     Contacts Maintenance to investigate.
 
o     Informs Shift Manager.
ILT 15-1 NRC Exam Scenario 1  Rev. 0  ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 9 of 19 Operator Actions  Event No.(s):
o     Conducts a brief.
5  Page 1 of 1
Terminus: 0RIX-PR001 secured, 0RIX-PR002 started, tech specs evaluated.
NOTES:
ILT 15-1 NRC Exam Scenario 1 Facility Approved       Page 8 of 19


== Description:==
ILT 15-1 NRC Exam Scenario 1                                                                            Rev. 0 Operator Actions Event No.(s):               5                                                                            Page    1  of 1


Clogged oil filter Condensate Booster (CB) Pump 'A' Initiation: Following Event 4 and upon direction of the Lead Examiner, insert REMOTE 3 Cues: Annunciator 5001
==
-1H Clogged Oil Filter CB Pump 1A Time Position Applicant's Actions or Behavior Key Parameter Response:
Description:==
Expected Annunciators:
Clogged oil filter Condensate Booster (CB) Pump A Initiation: Following Event 4 and upon direction of the Lead Examiner, insert REMOTE 3 Cues: Annunciator 5001-1H Clogged Oil Filter CB Pump 1A Time         Position                                         Applicants Actions or Behavior Key Parameter Response:
5001-1H Clogged Oil Filter CB Pump 1A Automatic Actions
Expected Annunciators: 5001-1H Clogged Oil Filter CB Pump 1A Automatic Actions: None ATC
: None ATC   Monitors reactor to ensure operations remain within established bands o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
* Monitors reactor to ensure operations remain within established bands o     Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
Reports issue to SRO.
* Reports issue to SRO.
Per CPS 5001
Per CPS 5001-1H, Clogged Oil Filter Condensate Booster Pump 1A:
-1H, Clogged Oil Filter Condensate Booster Pump 1A:
o Directs Equipment Operator to turn CUNO filter handle several turns for the 1A CB Pump.
o Directs Equipment Operator to turn C UNO filter handle several turns for the 1A CB Pump.
Per ARP or CPS 3104.01, Condensate/Condensate Booster (CD/CB) step 8.2.2:
Per ARP or CPS 3104.01, Condensate/Condensate Booster (CD/CB) step 8.2.2:
Starts CB Pump 1C.
* Starts CB Pump 1C.
Secures CB Pump 1A
* Secures CB Pump 1A.
. BOP Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
BOP
o Monitors reactor to ensure operations remain within established bands o Directs Equipment Operator to turn C UNO filter handle several turns for the 1A CB Pump.
* Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
SRO Acknowledges reports from ATC/BOP.
o Monitors reactor to ensure operations remain within established bands o Directs Equipment Operator to turn CUNO filter handle several turns for the 1A CB Pump.
Directs actions listed above.
SRO
Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
* Acknowledges reports from ATC/BOP.
* Directs actions listed above.
* Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
o Informs Shift Manager.
o Informs Shift Manager.
o Conducts a brief.
o Conducts a brief.
o Contacts Maintenance to investigate.
o Contacts Maintenance to investigate.
Terminus: CB Pumps shifted.
Terminus: CB Pumps shifted.
 
NOTES:
NOTES:
ILT 15-1 NRC Exam Scenario 1  Rev. 0  ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 10 of 19 Operator Actions Event No.(s):
ILT 15-1 NRC Exam Scenario 1 Facility Approved       Page 9 of 19
6  Page 1 of 1


== Description:==
ILT 15-1 NRC Exam Scenario 1                                                                            Rev. 0 Operator Actions Event No.(s):               6                                                                            Page      1    of  1


Inadvertent opening of a SRV Initiation: Following Event 5 and upon direction of the Lead Examiner, insert REMOTE 4 Cues: Annunciators 50 67-8L , SRV Monitoring System Trouble and 5066
==
-5B, ADS Or Safety Relief Valve Lifting Time Position Applicant's Actions or Behavior Key Parameter Response
Description:==
: Reactor Power, RPV Level Expected Annunciators
Inadvertent opening of a SRV Initiation: Following Event 5 and upon direction of the Lead Examiner, insert REMOTE 4 Cues: Annunciators 5067-8L, SRV Monitoring System Trouble and 5066-5B, ADS Or Safety Relief Valve Lifting Time         Position                                         Applicants Actions or Behavior Key Parameter Response: Reactor Power, RPV Level Expected Annunciators: 5067-8L, SRV Monitoring System Trouble and 5066-5B, ADS Or Safety Relief Valve Lifting Automatic Actions: None ATC         o     Reports issue to SRO.
: 5067-8L, SRV Monitoring System Trouble and 5066
* Monitors reactor to ensure operations remain within established bands.
-5B, ADS Or Safety Relief Valve Lifting Automatic Actions: None ATC o Reports issue to SRO.
o     Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
Monitors reactor to ensure operations remain within established bands. o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
Per CPS 4005.01 Loss Of Feedwater Heating
Per CPS 4005.01 Loss Of Feedwater Heating Reduces RR flow with FCV(s) to restore and maintain power at or below the original power level. BOP o Reports issue to SRO.
* Reduces RR flow with FCV(s) to restore and maintain power at or below the original power level.
o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
BOP         o     Reports issue to SRO.
Per CPS 4009.01 Inadvertent Opening Safety/Relief Valves: Sounds the containment evacuation alarm.
o     Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
(Attempts) to SHUT open SRV (F041G) by placing control switch to OPEN, and then back to OFF (from 1H13
Per CPS 4009.01 Inadvertent Opening Safety/Relief Valves:
-P601 or P642 control switches as necessary).
* Sounds the containment evacuation alarm.
Removes fuses for the "A" and "B" solenoids (for F041G) at panels 1H13
                              *      (Attempts) to SHUT open SRV (F041G) by placing control switch to OPEN, and then back to OFF (from 1H13-P601 or P642 control switches as necessary).
-P661/P662, using Table 1 for fuse location.
* Removes fuses for the A and B solenoids (for F041G) at panels 1H13-P661/P662, using Table 1 for fuse location.
SRO Acknowledges report from ATC/BOP. Directs actions listed above.
SRO
Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
* Acknowledges report from ATC/BOP.
Enters CPS 4009.01 Inadvertent Opening Safety/Relief Valves and CPS 4005.01 Loss Of Feedwater Heating.
* Directs actions listed above.
o May review ITS 3.4.4 Safety/Relief Valves (S/RVs) and verify entry conditions are NOT met.
* Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
o Informs Shift Manager.
* Enters CPS 4009.01 Inadvertent Opening Safety/Relief Valves and CPS 4005.01 Loss Of Feedwater Heating.
o Conducts a brief.
o     May review ITS 3.4.4 Safety/Relief Valves (S/RVs) and verify entry conditions are NOT met.
Terminus: SRV F041G is SHUT NOTES:
o     Informs Shift Manager.
ILT 15-1 NRC Exam Scenario 1  Rev. 0  ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 11 of 19 Operator Actions Event No.(s):
o     Conducts a brief.
7  Page 1 of 1
Terminus: SRV F041G is SHUT NOTES:
ILT 15-1 NRC Exam Scenario 1 Facility Approved     Page 10 of 19


== Description:==
ILT 15-1 NRC Exam Scenario 1                                                                            Rev. 0 Operator Actions Event No.(s):               7                                                                            Page      1    of 1


Loss of CY - Rapid Plant Shutdown Initiation: Following Event 6 and upon direction of the Lead Examiner, insert REMOTE 5 Cues: Annunciator CPS 5014-2B Low Press Cycle Cond Xfer Pump Disch Hdr Time Position Applicant's Actions or Behavior Key Parameter Response
==
: None Expected Annunciators
Description:==
: CPS 5014-2D, Low Press Cycled Cond Xfer Pumps Disch Hdr Automatic Actions
Loss of CY - Rapid Plant Shutdown Initiation: Following Event 6 and upon direction of the Lead Examiner, insert REMOTE 5 Cues: Annunciator CPS 5014-2B Low Press Cycle Cond Xfer Pump Disch Hdr Time         Position                                         Applicants Actions or Behavior Key Parameter Response: None Expected Annunciators: CPS 5014-2D, Low Press Cycled Cond Xfer Pumps Disch Hdr Automatic Actions: None o     For the Rapid Plant Shutdown, evacuates the containment and makes a plant ATC                announcement, Performing a Rapid Plant Shutdown due to loss of CY Pumps.
: None ATC o For the Rapid Plant Shutdown, evacuates the containment and makes a plant announcement, "Performing a Rapid Plant Shutdown due to loss of CY Pumps".
* When directed by the SRO, performs a Rapid Plant Shutdown IAW CPS 3005.01 Unit Power Changes by lowering core flow using RR FCVs until core flow is ~ 43 mlbm/hr.
When directed by the SRO, performs a Rapid Plant Shutdown IAW CPS 3005.01 Unit Power Changes by lowering core flow using RR FCVs until core flow is ~ 43 mlbm/hr.
* Places the mode switch in SHUTDOWN and carries out Scram Choreography by reporting:
Places the mode switch in SHUTDOWN and carries out Scram Choreography by reporting
* Rod status is
Rod status is-Reactor Power is- and trend Reactor pressure is- and trend Reactor level is- and trend Any EOPs with entry conditions (no values required).
* Reactor Power is and trend
o Stops all running condensate pumps 1CD01PA (B) (C) (D). Performs EOP actions as directed by SRO.
* Reactor pressure is and trend
BOP Reports annunciator 5014
* Reactor level is and trend
-2D Low Press Cycled Cond Xfer Pumps Disch Hdr to the SRO.
* Any EOPs with entry conditions (no values required).
Refers to the ARP for 5014
o     Stops all running condensate pumps 1CD01PA (B) (C) (D).
-2D. Per CPS 5014
* Performs EOP actions as directed by SRO.
-2D, Low Press Cycled Cond Xfer Pumps Disch Hdr:
BOP
Operates CY transfer pumps consistent with system demand to maintain normal header pressure per CPS 3208.01, Cycled/Makeup Condensate (CY/MC) o Operator may go to CPS 3208.01 Section 8.2.2 directly or to 8.3.1 which will then direct him/her to section 8.2.2.
* Reports annunciator 5014-2D Low Press Cycled Cond Xfer Pumps Disch Hdr to the SRO.
* Refers to the ARP for 5014-2D.
Per CPS 5014-2D, Low Press Cycled Cond Xfer Pumps Disch Hdr:
* Operates CY transfer pumps consistent with system demand to maintain normal header pressure per CPS 3208.01, Cycled/Makeup Condensate (CY/MC) o     Operator may go to CPS 3208.01 Section 8.2.2 directly or to 8.3.1 which will then direct him/her to section 8.2.2.
Per CPS 3208.01, Cycled/Makeup Condensate (CY/MC):
Per CPS 3208.01, Cycled/Makeup Condensate (CY/MC):
Starts the 'A' CY Pump:
* Starts the A CY Pump:
Observes an increase in Cyc Cond Xfer Pmp Disch Hdr Pressure followed by a decrease in Cyc Cond Xfer Pmp Disch Hdr Pressure on 1H13
* Observes an increase in Cyc Cond Xfer Pmp Disch Hdr Pressure followed by a decrease in Cyc Cond Xfer Pmp Disch Hdr Pressure on 1H13-P870-5014.
-P870-5014. Reports annunciator 5014
* Reports annunciator 5014-2D Low Press Cycled Cond Xfer Pumps Disch Hdr has been received again.
-2D Low Press Cycled Cond Xfer Pumps Disch Hdr has been received again.
* Reports loss of CY to the SRO.
Reports loss of CY to the SRO.
o     For the Rapid Plant Shutdown, evacuates the containment and makes a plant announcement, Performing a Rapid Plant Shutdown due to loss of CY Pumps.
o For the Rapid Plant Shutdown, evacuates the containment and makes a plant announcement, "Performing a Rapid Plant Shutdown due to loss of CY Pumps".
* Carries out Scram Choreography by reporting:
Carries out Scram Choreography by reporting:
* Reactor Scram
Reactor Scram MDRFP may start Evacuate the RCIC room Evacuate the Containment Determines rod status and reports it to the SRO Performs EOP actions as directed by SRO.
* MDRFP may start
SRO  Acknowledge s report s from ATC/BOP. Ensures operations are conducted within the bounds of Tech Specs and IAW Operations standards and approved procedures.
* Evacuate the RCIC room
Per CPS 3005.01 Unit Power Changes, d irects ATC to perform a Rapid Plant Shutdown or Reactor Scram when it has been determined that CY has been lost.
* Evacuate the Containment
o Directs ATC to stop all running condensate pumps 1CD01PA (B) (C) (D)
* Determines rod status and reports it to the SRO
* Performs EOP actions as directed by SRO.
* Acknowledges reports from ATC/BOP.
SRO
* Ensures operations are conducted within the bounds of Tech Specs and IAW Operations standards and approved procedures.
* Per CPS 3005.01 Unit Power Changes, directs ATC to perform a Rapid Plant Shutdown or Reactor Scram when it has been determined that CY has been lost.
o     Directs ATC to stop all running condensate pumps 1CD01PA (B) (C) (D)
ILT 15-1 NRC Exam Scenario 1 Facility Approved        Page 11 of 19


ILT 15-1 NRC Exam Scenario 1 Rev. 0 ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 12 of 19  Enters and executes CPS 4100.01 Reactor Scram. Carries out Scram Choreography by performing an Update:
ILT 15-1 NRC Exam Scenario 1                                                               Rev. 0
Update: Entering EOP-1 Entering the Scram Off
* Enters and executes CPS 4100.01 Reactor Scram.
-Normal End of Update Terminus: Reactor has been scrammed and scram actions are in progress.
* Carries out Scram Choreography by performing an Update:
* Update:
* Entering EOP-1
* Entering the Scram Off-Normal
* End of Update Terminus: Reactor has been scrammed and scram actions are in progress.
NOTES:
NOTES:
ILT 15-1 NRC Exam Scenario 1  Rev. 0  ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 13 of 19 Operator Actions Event No.(s):
ILT 15-1 NRC Exam Scenario 1 Facility Approved     Page 12 of 19
8 , 9  Page 1 of 2


== Description:==
ILT 15-1 NRC Exam Scenario 1                                                                              Rev. 0 Operator Actions Event No.(s):             8, 9                                                                            Page      1    of    2


==
Description:==
LOCA/RAT trip/E51-F013 Failure/Div 3 ERAT Feed Breaker Failure/TAF Blowdown/LPCS Fails to Auto Start Initiation: Triggered by the Main Generator trip in Event 7.
LOCA/RAT trip/E51-F013 Failure/Div 3 ERAT Feed Breaker Failure/TAF Blowdown/LPCS Fails to Auto Start Initiation: Triggered by the Main Generator trip in Event 7.
Cues: Multiple annunciators on 1H13
Cues: Multiple annunciators on 1H13-P680, 1H13-P870, and 1H13-P601, rising DW pressure and temperature indications Time         Position                                         Applicants Actions or Behavior Key Parameter Response: Rising DW temperature and pressure, loss of 4160 and 6900 V Non-vital busses.
-P680, 1H13
Expected Annunciators: Multiple annunciators on 1H13-P680, 1H13-P870, and 1H13-P601 Automatic Actions: ECCS systems and DGs start on high DW pressure (1.68 psig)
-P870, and 1H13
ATC         o     Reports trip of the RAT transformers/loss of non-vital AC power.
-P601, rising DW pressure and temperature indications Time Position Applicant's Actions or Behavior Key Parameter Response: Rising DW temperature and pressure, loss of 4160 and 6900 V Non
o     Reports that the RCIC Injection valve failed to open remotely and manually.Performs EOP actions as directed by SRO.
-vital busses.
* Performs EOP actions as directed by SRO.
Expected Annunciators
o     Reports that the LPCS Pump failed to automatically start and manually starts the pump.
: Multiple annunciators on 1H13
o     Coordinates with BOP operator to monitor and control RPV level and pressure.
-P680, 1H13
o     Reports failure of ADS to automatically initiate when RPV level reaches Level 1 (-145.5).
-P870, and 1H13
-P601 Automatic Actions: ECCS systems and DGs start on high DW pressure (1.68 psig)
 
[CT]  [CT] ATC o Reports trip of the RAT transformers/loss of non
-vital AC power
. o Reports that the RCIC Injection valve failed to open remotely and manually.Performs EOP actions as directed by SRO.
Performs EOP actions as directed by SRO.
o Reports that the LPCS Pump failed to automatically start and manually starts the pump.
o Coordinates with BOP operator to monitor and control RPV level and pressure.
o Reports failure of ADS to automatically initiate when RPV level reaches Level 1 (-145.5").
Per EOP-3, Emergency RPV Depressurization (may be performed by BOP):
Per EOP-3, Emergency RPV Depressurization (may be performed by BOP):
o When TAF (-160 inches) is reached, initiates ADS to Blowdown the reactor within 17.5 minutes after RPV level reaches  
[CT]
-145.5" (Level 1) when directed by the SRO. o Maximizes ECCS injection (including starting LPCS Pump) to restore RPV water level above TAF within 17.5 minutes after RPV level reaches  
o When TAF (-160 inches) is reached, initiates ADS to Blowdown the reactor within 17.5 minutes after RPV level reaches -145.5 (Level 1) when directed by the SRO.
-145.5" (Level 1)
[CT]
.  
o Maximizes ECCS injection (including starting LPCS Pump) to restore RPV water level above TAF within 17.5 minutes after RPV level reaches -145.5 (Level 1).
 
BOP         o     Reports trip of the RAT transformers/loss of non-vital AC power.
[CT] [CT] BOP o Reports trip of the RAT transformers/loss of non-vital AC power.
o     Performs a manual Group 1 Isolation.
o Performs a manual Group 1 Isolation.
o     Reports that the RCIC Injection valve failed to open remotely and manually.
o Reports that the RCIC Injection valve failed to open remotely and manually.
* Performs EOP actions as directed by SRO.
Performs EOP actions as directed by SRO.
o     Reports that the LPCS Pump failed to automatically start and manually starts the pump.
o Reports that the LPCS Pump failed to automatically start and manually starts the pump.
* Starts Containment Spray, as directed by the SRO.
Starts Containment Spray, as directed by the SRO.
* Secures Containment Spray when RPV water level is -100 inches WR.
Secures Containment Spray when RPV water level is -100 inches WR.
o     Reports failure of ADS to automatically initiate when RPV level reaches Level 1 (-145.5).
o Reports failure of ADS to automatically initiate when RPV level reaches Level 1 (-145.5").
Per EOP-3, Emergency RPV Depressurization (may be performed by BOP):
Per EOP-3, Emergency RPV Depressurization (may be performed by BOP):
o When TAF (-160 inches) is reached, initiates ADS to Blowdown the reactor within 17.5 minutes after RPV level reaches  
[CT]                        o When TAF (-160 inches) is reached, initiates ADS to Blowdown the reactor within 17.5 minutes after RPV level reaches -145.5 (Level 1) when directed by the SRO.
-145.5" (Level 1) when directed by the SRO. o Maximizes ECCS injection (including starting LPCS Pump and opening 1E12
[CT]                        o Maximizes ECCS injection (including starting LPCS Pump and opening 1E12-F005) to restore RPV water level above TAF within 17.5 minutes after RPV level reaches -
-F005) to restore RPV water level above TAF within 17.5 minutes after RPV level reaches  
145.5 (Level 1).
-145.5" (Level 1). Verifies ADS actuation using the following indications:
* Verifies ADS actuation using the following indications:
o SPDS o DCS Display 122 (2H) [Acoustic Monitor Input]
o SPDS o DCS Display 122 (2H) [Acoustic Monitor Input]
o DCS Display 186 (7B) ['A' Solenoid Input]
o DCS Display 186 (7B) [A Solenoid Input]
o 1H13-P601/P642 Solenoid Indicator Lights o 1H13-P866, Valve Flow Monitor Control Panel o 1H13-P614, ADS Safety Valve Temperature recorder 1B21
o 1H13-P601/P642 Solenoid Indicator Lights o 1H13-P866, Valve Flow Monitor Control Panel o 1H13-P614, ADS Safety Valve Temperature recorder 1B21-R614 o Indirect indication via changes in RPV pressure, RPV level, MSL flows &
-R614   o Indirect indication via changes in RPV pressure, RPV level, MSL flows & suppression pool temperatures.
suppression pool temperatures.
ILT 15-1 NRC Exam Scenario 1 Facility Approved      Page 13 of 19


ILT 15-1 NRC Exam Scenario 1 Rev. 0 ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 14 of 19   Event No.(s):
ILT 15-1 NRC Exam Scenario 1                                                                           Rev. 0 Event No.(s):            8, 9                                                                        Page    2    of  2 SRO
8 , 9  Page 2 of 2   
* Acknowledges reports from ATC/BOP.
* Directs actions listed above.
* Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
* Enters and executes the following off-normal procedures:
* CPS 4001.01 Reactor Coolant Leakage
* CPS 4001.02 Automatic Isolation
* Enters and executes EOP-1 RPV Control.
* Enters and executes EOP-6 Primary Containment Control
* Enters and executes EOP-3 Emergency RPV Depressurization (Blowdown) when RPV Level reaches TAF.
* When TAF (-160 inches) is reached, directs:
[CT]
* initiating ADS to Blowdown the reactor within 17.5 minutes after RPV level reaches -145.5 (Level 1).
[CT]
* maximizing ECCS injection (including starting LPCS Pump and opening 1E12-F005) to restore RPV water level above TAF within 17.5 minutes after RPV level reaches -145.5 (Level 1).
Terminus: The scenario can be terminated when a blowdown has been initiated and RPV level has being raised above TAF.
NOTES:
ILT 15-1 NRC Exam Scenario 1 Facility Approved       Page 14 of 19


[CT]  [CT] SRO  Acknowledge s reports from ATC/BOP.
ILT 15-1 NRC Exam Scenario 1                                                                         Rev. 0 Simulator Operator Instructions Initial Setup
Directs actions listed above.
Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
Enters and executes the following off
-normal procedures:
CPS 4001.01 Reactor Coolant Leakage CPS 4001.02 Automatic Isolation Enters and executes EOP
-1 RPV Control. Enters and executes EOP
-6 Primary Containment Control Enters and executes EOP
-3 Emergency RPV Depressurization (Blowdown) when RPV Level reaches TAF.
When TAF (-160 inches) is reached, directs:  initiating ADS to Blowdown the reactor within 17.5 minutes after RPV level reaches -145.5" (Level 1).
maximizing ECCS injection (including starting LPCS Pump and opening 1E12
-F005) to restore RPV water level above TAF within 17.5 minutes after RPV level reaches -145.5" (Level 1).
Terminus:  The scenario can be terminated when a blowdown has been initiated and RPV level has being raised above TAF. NOTES:
 
ILT 15-1 NRC Exam Scenario 1 Rev. 0 ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 15 of 19  Simulator Operator Instructions Initial Setup
: 1. Fill out plant status and have Turnover Sheet ready for the crew.
: 1. Fill out plant status and have Turnover Sheet ready for the crew.
: 2. Verify daily lamp test completed.
: 2. Verify daily lamp test completed.
: 3. Reset to IC-221 (PW 76319) @ 78% Power. If this is the first reset after swapping simulator loads, reset the IC twice.
: 3. Reset to IC-221 (PW 76319) @ 78% Power. If this is the first reset after swapping simulator loads, reset the IC twice.
: 4. Load the lesson plan for this scenario.
: 4. Load the lesson plan for this scenario.
: 5. Verify the following commands are active: A05_A02_A0508 TVM 5066
: 5. Verify the following commands are active:
-8A ADS B Out of Service (OFF) A05_A02_A0608 TVM 5067
* A05_A02_A0508 TVM 5066-8A ADS B Out of Service (OFF)
-8A ADS A Out of Service (OFF) A05_A02_A13DS47_1 ADS A&E Inhibit Wht Light (OFF) A05_A02_A13DS48_1 ADS B&F Inhibit Wht Light (OFF) A05_A02_A13S63 ADS A&E Inhibit PB (Inhibited)
* A05_A02_A0608 TVM 5067-8A ADS A Out of Service (OFF)
A05_A02_A13S64 ADS B&F Inhibit PB (Inhibited)
* A05_A02_A13DS47_1 ADS A&E Inhibit Wht Light (OFF)
YARIMVFP_2 E51F013 (immediate) Fail
* A05_A02_A13DS48_1 ADS B&F Inhibit Wht Light (OFF)
-To Position (FV = 0) YP_XMFTB_4106 LPCS Fail to Auto Start lp11acld001fsp=True (LPCS Injection Valve Auto Open Failure)
* A05_A02_A13S63 ADS A&E Inhibit PB (Inhibited)
* A05_A02_A13S64 ADS B&F Inhibit PB (Inhibited)
* YARIMVFP_2 E51F013 (immediate) Fail-To Position (FV = 0)
* YP_XMFTB_4106 LPCS Fail to Auto Start
* lp11acld001fsp=True (LPCS Injection Valve Auto Open Failure)
: 6. Place simulator in RUN.
: 6. Place simulator in RUN.
: 7. Turn on and advance recorders. 8. Verify RCIC Flow Controller is set at 6 2 0 g pm. 9. Verify the AR/PR server is running and stabilize AR/PR.
: 7. Turn on and advance recorders.
: 10. Verify Rod Drive pressure is in the expected range of 235-265 psid. 11. Provide pull sheets:
: 8. Verify RCIC Flow Controller is set at 620 gpm.
Step 29 is in progress - Gang 10A is at Position 10
: 9. Verify the AR/PR server is running and stabilize AR/PR.
. 12. Make sure Sequence A is selected.
: 10. Verify Rod Drive pressure is in the expected range of 235-265 psid.
: 11. Provide pull sheets: Step 29 is in progress - Gang 10A is at Position 10.
: 12. Make sure Sequence A is selected.
: 13. Make sure Individual Drive Mode is selected on the OCM.
: 13. Make sure Individual Drive Mode is selected on the OCM.
: 14. Remove EST Tags from the following control switches:
: 14. Remove EST Tags from the following control switches:
1H13-P877-5014 - MC Pump 'B' 1H13-P877-5016 - 1TD004A RFPT 1A HP Stop Vlv Before SDV 1H13-P877-5019 - 1B21-BSFV-1 Aux Stm to MSR 1B Inlet Vlv 1H13-P877-5019 - 1GS02CB SPE Blower 1B2 1H13-P800-5042 - 0VQ03CC DW Prg Low Flow Exh Fan 1H13-P801-5050 - 1VY03C RHR Hx Rm A Sply Fan 1H13-P801-5050 - 1VY04C RCIC Pmp Rm Sply Fan 1H13-P801-5050 - 0VC69Y Locker Rm Exh Fan 11C Isol Dmp r  1H13-P801-5052 - 0VC70Y Locker Rm Exh Fan 11C Isol Dmpr 1H13-P601-5064 - 1SX011A Div 1 Cross Tie Valve 1H13-P601-5065 - 1SX011B Div 2 Cross Tie Valve 1H13-P601-5067 - 1B21-F067B MSL B Outbd MSIV Before Seat Drain Vlv
* 1H13-P877-5014 - MC Pump B
* 1H13-P877-5016 - 1TD004A RFPT 1A HP Stop Vlv Before SDV
* 1H13-P877-5019 - 1B21-BSFV-1 Aux Stm to MSR 1B Inlet Vlv
* 1H13-P877-5019 - 1GS02CB SPE Blower 1B2
* 1H13-P800-5042 - 0VQ03CC DW Prg Low Flow Exh Fan
* 1H13-P801-5050 - 1VY03C RHR Hx Rm A Sply Fan
* 1H13-P801-5050 - 1VY04C RCIC Pmp Rm Sply Fan
* 1H13-P801-5050 - 0VC69Y Locker Rm Exh Fan 11C Isol Dmpr
* 1H13-P801-5052 - 0VC70Y Locker Rm Exh Fan 11C Isol Dmpr
* 1H13-P601-5064 - 1SX011A Div 1 Cross Tie Valve
* 1H13-P601-5065 - 1SX011B Div 2 Cross Tie Valve
* 1H13-P601-5067 - 1B21-F067B MSL B Outbd MSIV Before Seat Drain Vlv
: 15. Procedures that are expected to be used during this scenario are:
: 15. Procedures that are expected to be used during this scenario are:
CPS 9080.03 DG 1C Operability - Manual and Quick Start Operability (provided in the Crew Docs binders)
* CPS 9080.03 DG 1C Operability - Manual and Quick Start Operability (provided in the Crew Docs binders)
CPS 5062 Annunciator Response Procedures CPS 4200.01 Loss of AC Power ITS 3.8.1 AC Sources - Operating CPS 5006 Annunciator Response Procedures CPS 3304.01 Control Rod Hydraulic and Control (RD)
* CPS 5062 Annunciator Response Procedures
CPS 3304.02 Rod Control and Information System (RC&IS)
* CPS 4200.01 Loss of AC Power
* ITS 3.8.1 AC Sources - Operating
* CPS 5006 Annunciator Response Procedures
* CPS 3304.01 Control Rod Hydraulic and Control (RD)
* CPS 3304.02 Rod Control and Information System (RC&IS)
ILT 15-1 NRC Exam Scenario 1 Facility Approved  Page 15 of 19


ILT 15-1 NRC Exam Scenario 1 Rev. 0 ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 16 of 19  CPS 5140 Annunciators (MCR AR/PR LAN)
ILT 15-1 NRC Exam Scenario 1                                                                   Rev. 0
CPS 3315.03 Radiation Monitoring (AR/PR)
* CPS 5140 Annunciators (MCR AR/PR LAN)
ODCM 3.9.2 Radioactive Gaseous Effluent Monitoring Instrumentation CPS 5001 Annunciator Response Procedures CPS 3104.01 Condensate/Condensate Booster (CD/CB)
* CPS 3315.03 Radiation Monitoring (AR/PR)
CPS 5066 Annunciator Response Procedures CPS 5067 Annunciator Response Procedures CPS 4005.01 Loss of Feedwater Heating CPS 4009.01 Inadvertent Opening Safety/Relief Valves ITS 3.4.4 Safety/Relief Valves (S/RVs)
* ODCM 3.9.2 Radioactive Gaseous Effluent Monitoring Instrumentation
CPS 5014 Annunciator Response Procedures CPS 3208.01 Cycled/Makeup Condensate (CY/MC)
* CPS 5001 Annunciator Response Procedures
CPS 3005.01 Unit Power Changes CPS 4100.01 Reactor Scram EOP-1 RPV Control CPS 4001.01 Reactor Coolant Leak age  CPS 4001.02 Automatic Isolation EOP-6 Primary Containment Control EOP-3 Emergency RPV Depressurization
* CPS 3104.01 Condensate/Condensate Booster (CD/CB)
: 16. Hang OOS tags on: CY Pump 'B' (0CY01PB)
* CPS 5066 Annunciator Response Procedures
: 17. Identify T/S issues associated with OOS and turnover:
* CPS 5067 Annunciator Response Procedures
ITS 3.8.1 AC Sources - Operating, Condition B (with Division 3 DG speed droop set to 50%).
* CPS 4005.01 Loss of Feedwater Heating
: 18. Operating Equipment: None 19. Marked up copies: CPS 9080.03 (all step up to and including 8.2.16.1)
* CPS 4009.01 Inadvertent Opening Safety/Relief Valves
* ITS 3.4.4 Safety/Relief Valves (S/RVs)
* CPS 5014 Annunciator Response Procedures
* CPS 3208.01 Cycled/Makeup Condensate (CY/MC)
* CPS 3005.01 Unit Power Changes
* CPS 4100.01 Reactor Scram
* EOP-1 RPV Control
* CPS 4001.01 Reactor Coolant Leakage
* CPS 4001.02 Automatic Isolation
* EOP-6 Primary Containment Control
* EOP-3 Emergency RPV Depressurization
: 16. Hang OOS tags on: CY Pump B (0CY01PB)
: 17. Identify T/S issues associated with OOS and turnover: ITS 3.8.1 AC Sources - Operating, Condition B (with Division 3 DG speed droop set to 50%).
: 18. Operating Equipment: None
: 19. Marked up copies: CPS 9080.03 (all step up to and including 8.2.16.1)
: 20. Verify simulator conditions match the turnover.
: 20. Verify simulator conditions match the turnover.
ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 16 of 19


ILT 15-1 NRC Exam Scenario 1 Rev. 0 ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 17 of 19 Event Triggers and Role Play Event # 1. Secure DG 1C a. Event Trigger - None b. Role Play - Field Operator:
ILT 15-1 NRC Exam Scenario 1                                                                             Rev. 0 Event Triggers and Role Play Event #
If the BOP reports commencing to unload DG 1C, acknowledge the report.
: 1. Secure DG 1C
: a. Event Trigger - None
: b. Role Play - Field Operator: If the BOP reports commencing to unload DG 1C, acknowledge the report.
: 2. DG 1C Overspeeds When Unloaded
: 2. DG 1C Overspeeds When Unloaded
: a. Event Trigger - None b. Role Play - Field Operator: If requested to report local panel 1E22
: a. Event Trigger - None
-S001B status following the DG 1C trip , report the following:
: b. Role Play - Field Operator: If requested to report local panel 1E22-S001B status following the DG 1C trip, report the following:
(1) Annunciator 5286
(1) Annunciator 5286-1B Overspeed locked in (2) Annunciator 5286-2C Engine Tripped locked in (3) Both DG 1C 86 lockout relays tripped
-1B Overspeed locked in (2) Annunciator 5286
-2C Engine Tripped locked in (3) Both DG 1C 86 lockout relays tripped
: 3. CRD high temperature
: 3. CRD high temperature
: a. Event Trigger - Following Event 2 and when directed by the Lead Examiner , Activate Remote 1 and verify the following command(s):
: a. Event Trigger - Following Event 2 and when directed by the Lead Examiner, Activate Remote 1 and verify the following command(s):
(1) A02_A05_01_7_TVM=2 (Annunciator 5006
(1) A02_A05_01_7_TVM=2 (Annunciator 5006-1G CRD Hydr Temp Hi).
-1G CRD Hydr Temp Hi
: b. Role play:
). b. Role play: (1) Field Operator (if requested):
(1)   Field Operator (if requested):
a) Report, "CRD 52-25 is alarming at 255&deg;F and trending up at 1&deg;F every five minutes. All other CRD temperatures appear to be normal" b) After rod 52-25 has been repositioned to position 46, report "CRD 52-25 temperature is ~ 240&deg;F and slowly lowering.
a)         Report, CRD 52-25 is alarming at 255&deg;F and trending up at 1&deg;F every five minutes. All other CRD temperatures appear to be normal b)         After rod 52-25 has been repositioned to position 46, report CRD 52-25 temperature is ~ 240&deg;F and slowly lowering.
: 4. Failure of 0RIX
: 4. Failure of 0RIX-PR001 Ch 15 - Low flow due to sample pump failure
-PR001 Ch 15 - Low flow due to sample pump failure
: a. Event Trigger - Following Event 3 and when directed by the Lead Examiner, Activate Remote 2 and verify the following command(s):
: a. Event Trigger - Following Event 3 and when directed by the Lead Examiner , Activate Remote 2 and verify the following command(s):
(1) CAM0PR001IA_PUMP to 1. (PR001 Sample Pump Status)
(1) CAM0PR001IA_PUMP to 1. (PR001 Sample Pump Status)
(2) CAM0PR001TV_VALUE15 to 0. (PR001 Ch 15 input)
(2)   CAM0PR001TV_VALUE15 to 0. (PR001 Ch 15 input)
: b. Role play (1) Field Operator/Chemistry (if directed to check the status of the sample pump for 0RIX-PR001A) - "The pump is not running. No other abnormalities exist locally at the PRM."
: b. Role play (1)   Field Operator/Chemistry (if directed to check the status of the sample pump for 0RIX-PR001A) - The pump is not running. No other abnormalities exist locally at the PRM.
: 5. Clogged oil filter Condensate Booster Pump 'A'
: 5. Clogged oil filter Condensate Booster Pump A
: a. Event Trigger - When directed by the Lead Examiner , Activate Remote 3 and verify the following command(s):
: a. Event Trigger - When directed by the Lead Examiner, Activate Remote 3 and verify the following command(s):
(1) A01_A02_01_8_TVM Steady
(1) A01_A02_01_8_TVM Steady
: b. Role play (1) Field Operator (If requested): a) (when directed to turn the handle on the CB 1A C UNO Filter) - acknowledge request. Wait ~ one minute and report "I turned the handle on Condensate Booster Pump 1A C UNO Filter several times".
: b. Role play (1)   Field Operator (If requested):
b) (if asked for CB Pump 'A' oil pressure) - report "13 psig and slowly lowering".
a)         (when directed to turn the handle on the CB 1A CUNO Filter) - acknowledge request. Wait ~ one minute and report I turned the handle on Condensate Booster Pump 1A CUNO Filter several times".
c) (when directed to perform startup checks for the standby CB pump) - report "Pre
b)         (if asked for CB Pump A oil pressure) - report 13 psig and slowly lowering.
-starts are complete".
c)         (when directed to perform startup checks for the standby CB pump) - report Pre-starts are complete".
d) (when directed for local indications during prestart checks) - report "Lube oil pressure is > 8 psi and lube oil temperature is >75 F". e) (when asked if CB Pump C is operating normally locally) - report "CB Pump C is running normally".
d)         (when directed for local indications during prestart checks) - report Lube oil pressure is > 8 psi and lube oil temperature is >75&deg;F".
e)         (when asked if CB Pump C is operating normally locally) - report CB Pump C is running normally.
ILT 15-1 NRC Exam Scenario 1 Facility Approved    Page 17 of 19


ILT 15-1 NRC Exam Scenario 1 Rev. 0 ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 18 of 19 6. Inadvertent opening of a SRV
ILT 15-1 NRC Exam Scenario 1                                                                             Rev. 0
: a. Event Trigger - Following Event 5 and when directed by the Lead Examine r , Activate Remote 4 and verify the following command(s):
: 6. Inadvertent opening of a SRV
: a. Event Trigger - Following Event 5 and when directed by the Lead Examiner, Activate Remote 4 and verify the following command(s):
(1) YPXMALSE_77 to 50 (F041G MS Relief Failure)
(1) YPXMALSE_77 to 50 (F041G MS Relief Failure)
: b. Role play (1) Booth Operator (if requested by BOP and not performed at the V
: b. Role play (1)   Booth Operator (if requested by BOP and not performed at the V-Panel):
-Panel): a) cycle the Div 2 CS for SRV 41G to Open and then Off - Release 41G P642 CS to Open / Off (YP_HP101_7 Open and YP_HP101_7 Off) b) remove fuses for F041G 'A' Solenoid - Release 41G 'A' Fuse Removed (YP_XREMT_371 = OFF) c) remove fuses for F041G "B' Solenoid - Release 41G 'B' Fuse Removed (YP_XREMT_387 = OFF)
a)         cycle the Div 2 CS for SRV 41G to Open and then Off - Release 41G P642 CS to Open / Off (YP_HP101_7 Open and YP_HP101_7 Off) b)         remove fuses for F041G A Solenoid - Release 41G A Fuse Removed (YP_XREMT_371 = OFF) c)         remove fuses for F041G B Solenoid - Release 41G B Fuse Removed (YP_XREMT_387 = OFF)
: 7. Loss of CY - Rapid Plant Shutdown a. Event Trigger - Following Event 6 and when directed by the Lead Examiner , Activate Remote 5 and verify the following command(s):
: 7. Loss of CY - Rapid Plant Shutdown
: a. Event Trigger - Following Event 6 and when directed by the Lead Examiner, Activate Remote 5 and verify the following command(s):
(1) YFFWPPSS_11. (CY Pump C Shaft Shear)
(1) YFFWPPSS_11. (CY Pump C Shaft Shear)
(2) YAFWPPDE_9. (CY Pump A Pumping Efficiency)
(2) YAFWPPDE_9. (CY Pump A Pumping Efficiency)
: b. Role play (1) Field Operator
: b. Role play (1)   Field Operator:
: a) When directed to check operation of CY Pump 'C' - "The motor is running, but the pump shaft is not turning, and the motor is making noise and vibrating."
a)         When directed to check operation of CY Pump C - The motor is running, but the pump shaft is not turning, and the motor is making noise and vibrating.
b) When directed to perform CY Pump 'A' prestart checks - "CY Pump 'A' prestart checks are complete". When directed to Shut/verify shut 0CY004A CY Pump 'A' Discharge - "0CY004A is Shut". When directed to slowly open 0CY004A CY Pump 'A' Discharge - "0CY004A is Open".
b)         When directed to perform CY Pump A prestart checks - CY Pump A prestart checks are complete. When directed to Shut/verify shut 0CY004A CY Pump A Discharge - 0CY004A is Shut. When directed to slowly open 0CY004A CY Pump A Discharge - 0CY004A is Open.
c) When directed to check operation of CY Pump 'A' - "CY Pump 'A' discharge pressure indicates 30 psig locally. The pump is not making any unusual noises. There is no evidence of leakage locally."
c)         When directed to check operation of CY Pump A - CY Pump A discharge pressure indicates 30 psig locally. The pump is not making any unusual noises. There is no evidence of leakage locally.
(2) ROC Operator
(2)   ROC Operator:
: a) When informed that the CY system has been lost (3208.01 step 8.3.1.5 - acknowledge report.
a)         When informed that the CY system has been lost (3208.01 step 8.3.1.5 - acknowledge report.
b) If directed to check for indications of CY leakage - "There are no indications of increased inleakage in the ROC."
b)         If directed to check for indications of CY leakage - There are no indications of increased inleakage in the ROC.
: 8. LOCA/RAT trip/E51
: 8. LOCA/RAT trip/E51-F013 Failure/Div 3 ERAT Feed Breaker Failure/TAF Blowdown
-F013 Failure/Div 3 ERAT Feed Breaker Failure/TAF Blowdown
: a. Event Trigger - triggered by GCB 4506 opening during Event 7. Verify the following command(s):
: a. Event Trigger - triggered by GCB 4506 opening during Event 7. Verify the following command(s):
(1) RAT_B_OVERCURRENT (2) ED17B221C1FO 1ETR4C1 Bkr Tripped (3) YPXMALSE_511 RR03C Lower Plenum Leak
(1) RAT_B_OVERCURRENT (2) ED17B221C1FO 1ETR4C1 Bkr Tripped (3) YPXMALSE_511 RR03C Lower Plenum Leak
: b. Role play: (1) Maintenance (after 2 minutes from scram announcement) - report to the MCR as IMD.
: b. Role play:
(2) Field Operator:
(1)   Maintenance (after 2 minutes from scram announcement) - report to the MCR as IMD.
a) (If requested to check the status of Div 3 ERAT feeder breaker) - "The overcurrent relay is tripped".
(2)   Field Operator:
b) (If requested to manually open the RCIC injection valve) - "Heading to WEC for a brief".
a)         (If requested to check the status of Div 3 ERAT feeder breaker) - The overcurrent relay is tripped.
: 9. LPCS Fails to Auto Start
b)         (If requested to manually open the RCIC injection valve) - Heading to WEC for a brief.
/ LPCS Injection Valve 1E21F005 Fails to Auto Open at 472 psig RPV pressure
: 9. LPCS Fails to Auto Start / LPCS Injection Valve 1E21F005 Fails to Auto Open at 472 psig RPV pressure
: a. Event Trigger - Initial condition
: a. Event Trigger - Initial condition
: b. Role play - none ILT 15-1 NRC Exam Scenario 1  Rev. 0  ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 19 of 19 Turnover  1. Day of week and shift Today day shift
: b. Role play - none ILT 15-1 NRC Exam Scenario 1 Facility Approved     Page 18 of 19
: 2. Weather conditions Thunderstorms are expected in the area within the next hour.
: 3. Plant power level The plant is in Mode 1, operating at ~
78% power to support performance of CPS 9031.07 Main Turbine Control Valve Tests on the next shift.
RR Pumps A and B are operating in fast speed with FCVs at 53%/54%. 2714 MWt, 872 MWe, 71.02 Mlbm/hr Core Flow.
Control rods - Step 29 / Gang 10A is at position 10.
: 4. Thermal Limit Problems/Power Evolutions Power will be maintained at 78% throughout the shift.
CPS 3005.01 Unit Power Changes section 8.2 Power Decrease in progress. Step 8.2.5 is complete.
On Step 2 of ReMA C16
-001  RE and Rod Verifier are available on request.
: 5. LCO's in effect ITS 3.8.1 AC Sources - Operating, Condition B (with Division 3 DG speed droop set to 50%).
: 6. Surveillances in progress Div 3 DG has been operating at full load for > 60 minutes IAW CPS 9080.03 DG 1C Operability - Manual and Quick Start Operability step 8.2.16.1.
CPS 9082.01 Offsite Source Power Verification was completed one hour ago.
: 7. Status of Tagged Out Equipment CY Pump 'B' (0CY01PB) is OOS for maintenance. Not expected back this shift.
: 8. Previous Shift Evolutions completed Power was lowered to 78%. Div 3 DG was started and paralleled to RAT 'B' IAW CPS 9080.03 DG 1C Operability - Manual and Quick Start Operability.
CPS 9082.01 Offsite Source Power Verification was completed one (1) hour ago.
: 9. Evolutions planned for the shift Unload DG 1C and complete CPS 9080.03 DG 1C Operability - Manual and Quick Start Operability starting at step 8.2.16.2.
: 10. Risk Levels Green  Protected Equipment: FC 'B'
: 11. Dose equivalent Iodine 131 reading 1.5 E
-6 curies per gram ILT 15-1 NRC Exam Scenario 2  Rev. 1  ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 1 of 18  Exelon Nuclear ILT 15-1 NRC Exam


Scenario Number:  NRC Exam Scenario 2 Revision Number: 1 Date: 10/28/16  
ILT 15-1 NRC Exam Scenario 1                                                                      Rev. 0 Turnover
: 1.      Day of week and shift
* Today day shift
: 2.      Weather conditions
* Thunderstorms are expected in the area within the next hour.
: 3.      Plant power level
* The plant is in Mode 1, operating at ~ 78% power to support performance of CPS 9031.07 Main Turbine Control Valve Tests on the next shift.
* RR Pumps A and B are operating in fast speed with FCVs at 53%/54%. 2714 MWt, 872 MWe, 71.02 Mlbm/hr Core Flow.
* Control rods - Step 29 / Gang 10A is at position 10.
: 4.      Thermal Limit Problems/Power Evolutions
* Power will be maintained at 78% throughout the shift.
* CPS 3005.01 Unit Power Changes section 8.2 Power Decrease in progress. Step 8.2.5 is complete.
* On Step 2 of ReMA C16-001
* RE and Rod Verifier are available on request.
: 5.      LCOs in effect
* ITS 3.8.1 AC Sources - Operating, Condition B (with Division 3 DG speed droop set to 50%).
: 6.      Surveillances in progress
* Div 3 DG has been operating at full load for > 60 minutes IAW CPS 9080.03 DG 1C Operability - Manual and Quick Start Operability step 8.2.16.1.
* CPS 9082.01 Offsite Source Power Verification was completed one hour ago.
: 7.      Status of Tagged Out Equipment
* CY Pump B (0CY01PB) is OOS for maintenance. Not expected back this shift.
: 8.      Previous Shift Evolutions completed
* Power was lowered to 78%. Div 3 DG was started and paralleled to RAT B IAW CPS 9080.03 DG 1C Operability - Manual and Quick Start Operability.
* CPS 9082.01 Offsite Source Power Verification was completed one (1) hour ago.
: 9.      Evolutions planned for the shift
* Unload DG 1C and complete CPS 9080.03 DG 1C Operability - Manual and Quick Start Operability starting at step 8.2.16.2.
: 10.      Risk Levels
* Green
* Protected Equipment: FC B
: 11.      Dose equivalent Iodine 131
* reading 1.5 E-6 &#xb5;curies per gram ILT 15-1 NRC Exam Scenario 1 Facility Approved  Page 19 of 19


Developed By:
ILT 15-1 NRC Exam Scenario 2                                                              Rev. 1 Exelon Nuclear ILT 15-1 NRC Exam Scenario Number:
T. Jennings 9/2 2/16   Instructor Date Validated By:
NRC Exam Scenario 2 Revision Number: 1 Date: 10/28/16 Developed By:                     T. Jennings                   9/22/16 Instructor               Date Validated By:                     Michael Antonelli             10/28/16 SME or Instructor             Date Reviewed By:                     Jim Lucas                     11/15/16 Operations Representative         Date Approved By:                     T. Jennings                   11/15/16 Training Department             Date ILT 15-1 NRC Exam Scenario 2 Facility Approved        Page 1 of 18
Michael Antonelli 10/28/16   SME or Instructor Date Reviewed By: Jim Lucas 11/15/16   Operations Representative Date Approved By:
 
T. Jennings 11/15/16   Training Department Date ILT 15-1 NRC Exam Scenario 2 Rev. 1 ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 2 of 18 Appendix D Scenario Outline Form ES-D-1   Facility:
ILT 15-1 NRC Exam Scenario 2                                                                           Rev. 1 Appendix D                                               Scenario Outline                               Form ES-D-1 Facility: Clinton Power Station                   Scenario No.: 2             Operating Test No.: 2017-301 Examiners: ____________________________                                     Operators: ____________________
Clinton Power Station Scenario No.:
2                       Operating Test No.:
2017-301   Examiners: ____________________________
Operators: ____________________
____________________________                                                      ____________________
____________________________
____________________
Initial Conditions:
Initial Conditions:
Mode 1 Rx Power at 99%.
* Mode 1 Rx Power at 99%.
Weather conditions are calm and clear.
* Weather conditions are calm and clear.
Turnover:
Turnover:
Priorities for the shift are as follows: Shift Generator Stator Cooling Pumps IAW CPS 3110.01 01Generator Stator Cooling (GC) section 8.2.4 Shifting GC Water Pumps (MCR) to support upcoming corrective maintenance on GC Pump B
* Priorities for the shift are as follows:
. Maintain power at 99% throughout the shift.
* Shift Generator Stator Cooling Pumps IAW CPS 3110.01 01Generator Stator Cooling (GC) section 8.2.4 Shifting GC Water Pumps (MCR) to support upcoming corrective maintenance on GC Pump B.
Event No. Malf. No. Event Type* Event Description 1 N/A N-BOP Shift Generator Stator Cooling (GC) Pumps.
* Maintain power at 99% throughout the shift.
2 YP_XMFTB_4102 I-BOP TS-SRO Spurious HPCS auto initiation 3 A02_A01_02_10_TVM C-ATC TS-SRO RR Pump B high vibration 4 N/A R-ATC Reduce power with Control Rods 5 YP_XMFTB_3917 C-BOP CCW Pump 1A trip 6 YP_XMFTB_4965 YP_XMFTB_4963 C-ATC RR Pump A trip/ATWS 7 YPXMALSE_256 0.08%
Event                   Malf. No.                       Event                         Event No.                                                      Type*                       Description 1                         N/A                         N-BOP     Shift Generator Stator Cooling (GC) Pumps.
YAMSSIFP_4 YVMSSILK_8 YPXMALSE_256 0.5%
2               YP_XMFTB_4102                         I-BOP     Spurious HPCS auto initiation TS-SRO 3             A02_A01_02_10_TVM                       C-ATC     RR Pump B high vibration TS-SRO 4                         N/A                         R-ATC     Reduce power with Control Rods 5               YP_XMFTB_3917                         C-BOP     CCW Pump 1A trip 6               YP_XMFTB_4965                         C-ATC     RR Pump A trip/ATWS YP_XMFTB_4963 7             YPXMALSE_256 0.08%                       M-All     Unisolable MSL D Leak / Multiple Secondary YAMSSIFP_4                                    Containment Areas above max safe YVMSSILK_8                                    temperatures requiring blowdown YPXMALSE_256 0.5%
M-All Unisolable MSL 'D' Leak
8               YP_XREMT_739                           C-All     MSIVs fail to close on Group 1 isolation signal
/ Multiple Secondary Containment Areas above max safe temperatures requiring blowdown 8 YP_XREMT_739 C-All MSIVs fail to close on Group 1 isolation signal
  *         (N)ormal,    (R)eactivity,     (I)nstrument,   (C)omponent,   (M)ajor ILT 15-1 NRC Exam Scenario 2 Facility Approved      Page 2 of 18
* (N)ormal,    (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor


ILT 15-1 NRC Exam Scenario 2 Rev. 1 ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 3 of 18 Appendix D Scenario Outline Form ES-D-1   Scenario No.:
ILT 15-1 NRC Exam Scenario 2                                                                     Rev. 1 Appendix D                                       Scenario Outline                                   Form ES-D-1 Scenario No.:     2                                                                     Operating Test No.: 2017-301 Narrative Summary Event #                                             Description
2                           Operating Test No.:
: 1. Shift Generator Stator Cooling (GC) Pumps The BOP will shift GC Water Pumps IAW CPS 3110.01Generator Stator Cooling (GC) section 8.2.4 Shifting GC Water Pumps (MCR) to support upcoming maintenance on 1GC01PB.
2017-301 Narrative Summary Event # Description 1. Shift Generator Stator Cooling (GC) Pumps The BOP will shift GC Water Pumps IAW CPS 3110.01Generator Stator Cooling (GC) section 8.2.4 Shifting GC Water Pumps (MCR) to support upcoming maintenance on 1GC01PB. 2. Spurious HPCS auto initiation High Pressure Core Spray (HPCS) initiates with no operator action. The following annunciators are received: 5062
: 2. Spurious HPCS auto initiation High Pressure Core Spray (HPCS) initiates with no operator action. The following annunciators are received: 5062-3C RUNNING DIESEL GEN 1C, 5062-4E HPCS PUMP AUTO START, 5064-1B AUTO START SSW PUMP 1C and 5064-4B AUTO START DG FUEL OIL XFER PUMP 1C. IAW CPS 3309.01 High Pressure Core Spray (HPCS), the crew will verify by at least two independent indications that misoperation in automatic is confirmed or adequate core cooling is assured. Once confirmed, the SRO will direct the BOP operator to secure HPCS. Technical Specification LCO 3.5.1 Actions B.1 and B.2 will be evaluated requiring verification by administrative means that the RCIC system is operable when required AND the HPCS system is restored to operable status within 14 days.
-3C RUNNING DIESEL GEN 1C, 5062
: 3. RR Pump B high vibration Annunciator 5003-2K RECIRC PMP B MTR VIBR HI is received. BOP will determine B RR Pump vibration levels are 20 mil P-P steady on both probes. ATC will perform RR Loop B Emergency Shutdown. SRO will enter CPS 4008.01 Abnormal Reactor Coolant Flow, CPS 4002.01 Abnormal RPV Level/Loss of Feedwater At Power and ITS LCO 3.4.1 B.1 and C.1.
-4E HPCS PUMP AUTO START, 5064
: 4. Reduce power with Control Rods Due to the RR Pump B Emergency Loop Shutdown and using CPS 3005.01 Unit Power Changes (Figure 1: Stability Control & Power/Flow Operating Map), the crew will identify a MELLA Limit violation.
-1B AUTO START SSW PUMP 1C and 5064
Per CPS 3005.01 Unit Power Changes, section 6.5 MELLA Limit Operational Concerns, the SRO will enter Action A.1 for ITS 3.2.1, 3.2.2 and 3.2.3 to restore power distribution limits within 2 hours and direct the ATC to promptly lower power via reverse rod sequence or CRAM RODS. Additionally, the SRO may direct ATC to lower reactor power to 58% RTP IAW TS LCO 3.4.1 B.1 based on having one recirculation loop in operation.
-4B AUTO START DG FUEL OIL XFER PUMP 1C. IAW CPS 3309.01 High Pressure Core Spray (HPCS), the crew will verify by at least two independent indications that misoperation in automatic is confirmed or adequate core cooling is assured. Once confirmed, the SRO will direct the BOP operator to secure HPCS. Technical Specification LCO 3.5.1 Actions B.1 and B.2 will be evaluated requiring verification by administrative means that the RCIC system is operable when required AND the HPCS system is restored to operable status within 14 days.
: 5. CCW Pump 1A trip The following annunciators are received: 5040-1B AUTO TRIP PUMP/MOTOR, 5040-2C LOW PRESS CCW HX OUTLET HEADER and 5003-3D/3K RECIRC MTR A/B WDG CLG WTR FLOW LO are received. BOP will observe that CCW Pump 1A has tripped, review the ARP and start a standby CCW pump.
: 3. RR Pump B high vibration Annunciator 5003
: 6. RR Pump A trip/ATWS Annunciator 5003-1F RECIRC PMP A MTR BRKR Trip is received due to a trip of the A RR Pump. With no RR Pumps operating with the mode switch in RUN, the ATC will insert a manual scram (IAW CPS 4008.01 Abnormal Reactor Coolant Flow) and shut 1B33-F023A RR Pmp Suction Vlv. When the mode switch is placed in shutdown, the reactor will fail to scram requiring entry into EOP-1 RPV Control and then transition into EOP-1A ATWS RPV Control. Control Rods will be successfully inserted when ARI is manually initiated. Once shutdown criteria is met, the SRO will exit EOP-1A and re-enter EOP-1 RPV Control.
-2K RECIRC PMP B MTR VIBR HI is received. BOP will determine 'B' RR Pump -P 'steady' on both probes. ATC will perform RR Loop 'B' Emergency Shutdown. SRO will enter CPS 4008.01 Abnormal Reactor Coolant Flow, CPS 4002.01 Abnormal RPV Level/Loss of Feedwater At Power and ITS LCO 3.4.1 B.1 and C.1.
: 7. Unisolable MSL D Leak / Multiple Secondary Containment Areas above max safe temperatures requiring blowdown Multiple annunciators are received due to an unisolable MSL D leak into the Aux Building Steam Tunnel (secondary containment). The SRO will enter 4001.01 Reactor Coolant Leakage off-normal and EOP-8 Secondary Containment Control. Temperatures will continue to rise in the Secondary Containment, and when two or more areas exceed max safe temperatures, the SRO will enter EOP-3 Emergency RPV Depressurization and will direct a blowdown to be performed.
: 4. Reduce power with Control Rods Due to the RR Pump 'B' Emergency Loop Shutdown and using CPS 3005.01 Unit Power Changes (Figure 1: Stability Control & Power/Flow Operating Map), the crew will identify a MELLA Limit violation.
Per CPS 3005.01 Unit Power Changes, section 6.5 MELLA Limit Operational Concerns, the SRO will enter Action A.1 for ITS 3.2.1, 3.2.2 and 3.2.3 to restore power distribution limits within 2 hours and direct the ATC to promptly lower power via reverse rod sequence or CRAM RODS. Additionally, the SRO may loop in operation.
: 5. CCW Pump 1A trip The following annunciators are received: 5040
-1B AUTO TRIP PUMP/MOTOR, 5040
-2C LOW PRESS CCW HX OUTLET HEADER and 5003
-3D/3K RECIRC MTR A/B WDG CLG WTR FLOW LO are received. BOP will observe that CCW Pump 1A has tripped, review the ARP and start a standby CCW pump. 6. RR Pump A trip/ATWS Annunciator 5003
-1F RECIRC PMP A MTR BRKR Trip is received due to a trip of the 'A' RR Pump. With no RR Pumps operating with the mode switch in RUN, the ATC will insert a manual scram (IAW CPS 4008.01 Abnormal Reactor Coolant Flow) and shut 1B33
-F023A RR Pmp Suction Vlv. When the mode switch is placed in shutdown, the reactor will fail to scram requiring entry into EOP-1 RPV Control and then transition into EOP-1A ATWS RPV Control. Control Rods will be successfully inserted when ARI is manually initiated. Once shutdown criteria is met, the SRO will exit EOP
-1A and re-enter EOP-1 RPV Control. 7. Unisolable MSL 'D' Leak / Multiple Secondary Containment Areas above max safe temperatures requiring blowdown Multiple annunciators are received due to an unisolable MSL 'D' leak into the Aux Building Steam Tunnel (secondary containment). The SRO will enter 4001.01 Reactor Coolant Leakage off
-normal and EOP
-8 Secondary Containment Control. Temperatures will continue to rise in the Secondary Containment, and when two or more areas exceed max safe temperatures, the SRO will enter EOP
-3 Emergency RPV Depressurization and will direct a blowdown to be performed.
: 8. MSIVs fail to close on Group 1 isolation signal Condenser vacuum will continue to degrade causing the Main Turbine and the TDRFPs to trip. The MSIVs fail to automatically close but can be manually closed from the MCR.
: 8. MSIVs fail to close on Group 1 isolation signal Condenser vacuum will continue to degrade causing the Main Turbine and the TDRFPs to trip. The MSIVs fail to automatically close but can be manually closed from the MCR.
ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 3 of 18


ILT 15-1 NRC Exam Scenario 2 Rev. 1 ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 4 of 18 EOP 1, 3, 8 Critical tasks:
ILT 15-1 NRC Exam Scenario 2                                                                   Rev. 1 EOP 1, 3, 8 Critical tasks:
RPV-5.1/6.1 ATC/BOP inserts control rods and/or starts Standby Liquid Control Pumps to shutdown the reactor. SC-1.2 SRO enters EOP
* RPV-5.1/6.1 ATC/BOP inserts control rods and/or starts Standby Liquid Control Pumps to shutdown the reactor.
-3 and performs a blowdown when 2 or more areas are above the max safe value of the same parameter (Table T, U, W), and a Primary System is discharging into the Secondary Containment, which cannot be isolated. If the crew Anticipates Blowdown using bypass valves, and in doing so two areas do not reach a max safe condition, then this critical task is considered to be met. (PRA)
* SC-1.2 SRO enters EOP-3 and performs a blowdown when 2 or more areas are above the max safe value of the same parameter (Table T, U, W), and a Primary System is discharging into the Secondary Containment, which cannot be isolated. If the crew Anticipates Blowdown using bypass valves, and in doing so two areas do not reach a max safe condition, then this critical task is considered to be met.
ILT 15-1 NRC Exam Scenario 2  Rev. 1  ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 5 of 18 Operator Actions Event No.(s):
(PRA)
1  Page 1 of 1
ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 4 of 18


== Description:==
ILT 15-1 NRC Exam Scenario 2                                                                                    Rev. 1 Operator Actions Event No.(s):                 1                                                                                    Page        1    of  1


Shift Generator Stator Cooling (GC) Pumps Initiation: Following shift turnover and when directed by the Lead Examiner Cues: Directed by SRO Time Position Applicant's Actions or Behavior General Note on Requirements for "Expected Annunciator Response"
==
- OP-AA-103-102 If this evolution was pre
Description:==
-briefed and "Expected Alarms" were reviewed, the following expectations apply:
Shift Generator Stator Cooling (GC) Pumps Initiation: Following shift turnover and when directed by the Lead Examiner Cues: Directed by SRO Time         Position                                           Applicants Actions or Behavior General Note on Requirements for Expected Annunciator Response - OP-AA-103-102 If this evolution was pre-briefed and Expected Alarms were reviewed, the following expectations apply:
  "Expected alarms" will be flagged When the annunciator comes in the operator will announce "Expected Alarm" The annunciator response procedure (ARP) need not be entered since it has already been reviewed in the pre
* Expected alarms will be flagged
-brief. If a pre-brief was not conducted the operator should perform the following:
* When the annunciator comes in the operator will announce Expected Alarm
When an annunciator comes in the ARP should be referred to.
* The annunciator response procedure (ARP) need not be entered since it has already been reviewed in the pre-brief.
The annunciator may then be identified as an "Expected Alarm", flagged, and from that point on the ARP need not be referred t
If a pre-brief was not conducted the operator should perform the following:
: o. Key Parameter Response:
* When an annunciator comes in the ARP should be referred to.
GC Pump indicator lights on 1H13
* The annunciator may then be identified as an Expected Alarm, flagged, and from that point on the ARP need not be referred to.
-P870-5017 Expected Annunciators:
Key Parameter Response: GC Pump indicator lights on 1H13-P870-5017 Expected Annunciators: 5017-5A Auto Start Stator Cooling Water Pump (when the standby pump auto start feature is tested)
5017-5A Auto Start Stator Cooling Water Pump (when the standby pump auto start feature is tested)
Automatic Actions: GC Pump 1B will auto start when the when the standby pump auto start feature is tested.
Automatic Actions
ATC
: GC Pump 1B will auto start when the when the standby pump auto start feature is tested.
* Monitors reactor to ensure operations remain within established bands.
ATC   Monitors reactor to ensure operations remain within established bands.
o     Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
o     Performs Plant Announcement.
o Performs Plant Announcement.
BOP
BOP Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
* Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
o Monitors reactor to ensure operations remain within established bands.
o     Monitors reactor to ensure operations remain within established bands.
o Performs Plant Announcement.
o     Performs Plant Announcement.
IAW CPS 3110.01 Generator Stator Cooling (GC) section 8.2.4:
IAW CPS 3110.01 Generator Stator Cooling (GC) section 8.2.4:
BOP obtains authorization from the Control Room Supervisor to perform critical steps ({CS}) before performing CPS 3110.01 Section 8.2.4.
* BOP obtains authorization from the Control Room Supervisor to perform critical steps ({CS})
{CS} Starts standby GC Pump 1A (1GC01PA).
before performing CPS 3110.01 Section 8.2.4.
{CS} Stops GC Pump 1B (1GC01PB). Allows the control switch to spring return to AUTO.
                                      *    {CS} Starts standby GC Pump 1A (1GC01PA).
Tests the standby GC pump auto start by:
                                      *    {CS} Stops GC Pump 1B (1GC01PB). Allows the control switch to spring return to AUTO.
Depressing the Generator Cooling Water Pump Test push
* Tests the standby GC pump auto start by:
-button. Verify the AUTO START STATOR COOLING WATER (5017
* Depressing the Generator Cooling Water Pump Test push-button.
-5A) annunciator illuminates.
* Verify the AUTO START STATOR COOLING WATER (5017-5A) annunciator illuminates.
{CS} Places control switch for the GC Pump 1B (1GC01PB) in the STOP position, AND lets it spring return to AUTO.
                                *      {CS} Places control switch for the GC Pump 1B (1GC01PB) in the STOP position, AND lets it spring return to AUTO.
SRO Acknowledges reports from ATC/BOP. Authorizes BOP to perform the critical steps contained in CPS 3110.01 Section 8.2.4 (denoted by {CS}). Provides direct oversight of the GC Pump shift.
SRO
Directs actions listed above.
* Acknowledges reports from ATC/BOP.
Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
* Authorizes BOP to perform the critical steps contained in CPS 3110.01 Section 8.2.4 (denoted by
Terminus: GC Pumps shifted and the auto start feature of the standby GC pump has been tested.
{CS}).
NOTES:
* Provides direct oversight of the GC Pump shift.
 
* Directs actions listed above.
Solid bullets are required actions o Hollow bullets are actions that may or may not be performed
* Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
 
Terminus: GC Pumps shifted and the auto start feature of the standby GC pump has been tested.
ILT 15-1 NRC Exam Scenario 2  Rev. 1  ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 6 of 18 Operator Actions Event No.(s):
NOTES:
2  Page 1 of 1
* Solid bullets are required actions o     Hollow bullets are actions that may or may not be performed ILT 15-1 NRC Exam Scenario 2 Facility Approved         Page 5 of 18
 
== Description:==


Spurious HPCS Auto Initiation Initiation: Following Event 1 and upon direction of the Lead Examiner, insert REMOTE 1. Cues: Annunciator 50 62-4E , HPCS Pump Auto Start Time Position Applicant's Actions or Behavior Key Parameter Response
ILT 15-1 NRC Exam Scenario 2                                                                              Rev. 1 Operator Actions Event No.(s):               2                                                                              Page    1    of   1
: None Expected Annunciators
: Multiple annunciators Automatic Actions
: DG 1C Auto Starts, HPCS To CNMT Outbd Isln Valve (1E22
-F004) OPEN ATC  Monitors reactor to ensure operations remain within established bands. o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
o Performs Plant Announcements.
o Dispatches an Equipment Operator to investigate.
BOP  Reports issue to SRO.
Refers to ARPs. o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
o Performs Plant Announcements.
o Dispatches an Equipment Operator to investigate.


Per CPS 3309.01 High Pressure Core Spray (HPCS): Verifies by at least two independent indications that:
==
Misoperation in automatic is confirmed, or Adequate core cooling is assured.
Description:==
Performs shutdown of HPCS (Initiation Signal Present):
Spurious HPCS Auto Initiation Initiation: Following Event 1 and upon direction of the Lead Examiner, insert REMOTE 1.
Shuts 1E22
Cues: Annunciator 5062-4E, HPCS Pump Auto Start Time        Position                                          Applicants Actions or Behavior Key Parameter Response: None Expected Annunciators: Multiple annunciators Automatic Actions: DG 1C Auto Starts, HPCS To CNMT Outbd Isln Valve (1E22-F004) OPEN ATC
-F004 HPCS To CNMT Outbd Isln Valve.
* Monitors reactor to ensure operations remain within established bands.
Stops HPCS Pump, 1E22
o      Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
-C001. o Verifies 1E22
o      Performs Plant Announcements.
-F012, HPCS Min Flow To Suppr Pool shuts.
o      Dispatches an Equipment Operator to investigate.
BOP
* Reports issue to SRO.
* Refers to ARPs.
o      Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
o      Performs Plant Announcements.
o      Dispatches an Equipment Operator to investigate.
Per CPS 3309.01 High Pressure Core Spray (HPCS):
* Verifies by at least two independent indications that:
* Misoperation in automatic is confirmed, or
* Adequate core cooling is assured.
* Performs shutdown of HPCS (Initiation Signal Present):
* Shuts 1E22-F004 HPCS To CNMT Outbd Isln Valve.
* Stops HPCS Pump, 1E22-C001.
o Verifies 1E22-F012, HPCS Min Flow To Suppr Pool shuts.
o Verifies HPCS Pmp Rm Sply Fan, 1VY08CA stops.
o Verifies HPCS Pmp Rm Sply Fan, 1VY08CA stops.
o Verifies HPCS Pmp Rm Sply Fan, 1VY08CB stops.
o Verifies HPCS Pmp Rm Sply Fan, 1VY08CB stops.
SRO Acknowledges report from BOP.
SRO
Directs actions listed above.
* Acknowledges report from BOP.
Enters and executes CPS 4002.01 Abnormal RPV Level/Loss Of Feedwater At Power o Establishes reactor water level as a critical parameter and directs ATC to scram the reactor if RPV water level reaches 48 inches and rising.
* Directs actions listed above.
Evaluates and enters TS 3.5.1 Action B.1 and B.2. Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
* Enters and executes CPS 4002.01 Abnormal RPV Level/Loss Of Feedwater At Power o     Establishes reactor water level as a critical parameter and directs ATC to scram the reactor if RPV water level reaches 48 inches and rising.
o Contacts Maintenance to investigate.
* Evaluates and enters TS 3.5.1 Action B.1 and B.2.
o Informs Shift Manager.
* Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
Conducts a brief.
o     Contacts Maintenance to investigate.
Terminus: HPCS is secured and Technical Specifications evaluated. NOTES:  
o     Informs Shift Manager.
* Conducts a brief.
Terminus: HPCS is secured and Technical Specifications evaluated.
NOTES:
ILT 15-1 NRC Exam Scenario 2 Facility Approved        Page 6 of 18


ILT 15-1 NRC Exam Scenario 2 Rev. 1 ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 7 of 18  Operator Actions Event No.(s):
ILT 15-1 NRC Exam Scenario 2                                                                                           Rev. 1 Operator Actions Event No.(s):               3                                                                                           Page         1     of   1
3 Page 1 of 1


== Description:==
==
RR Pump 'B' High Vibration Initiation: Following Event 2 and upon direction of the Lead Examiner, insert REMOTE 2. Cues: Annunciator 5003
Description:==
-2K Recirc Pmp B Mtr Vibr Hi Time Position Applicant's Actions or Behavior Key Parameter Response
RR Pump B High Vibration Initiation: Following Event 2 and upon direction of the Lead Examiner, insert REMOTE 2.
: RR Pump Vibration Indications Expected Annunciators
Cues: Annunciator 5003-2K Recirc Pmp B Mtr Vibr Hi Time         Position                                               Applicants Actions or Behavior Key Parameter Response: RR Pump Vibration Indications Expected Annunciators: 5003-2K Recirc Pmp B Mtr Vibr Hi Automatic Actions: None ATC
: 5003-2K Recirc Pmp B Mtr Vibr Hi Automatic Actions
* Reports issue to SRO.
: None ATC Reports issue to SRO.
* Refers to ARPs.
Refers to ARPs.
Per 5003-2K Recirc Pmp B Mtr Vibr Hi and CPS 3302.01 Reactor Recirculation (RR):
Per 5003-2K Recirc Pmp B Mtr Vibr Hi and CPS 3302.01 Reactor Recirculation (RR):
Performs emergency loop shutdown of RR Pump B.
* Performs emergency loop shutdown of RR Pump B.
o Depresses P680 RR Pump B Vibration reset button.
o     Depresses P680 RR Pump B Vibration reset button.
Per CPS 4008.01 Abnormal Reactor Coolant Flow:
Per CPS 4008.01 Abnormal Reactor Coolant Flow:
o Monitors RR Pump seal pressure for signs of degradation Checks operation on the Power to Flow map Notifies SRO MELLLA limit has being excee ded  Determines flow transient has resulted in entry into the OPRM Enable Region by observing the status of annunciator 5006
o     Monitors RR Pump seal pressure for signs of degradation
-3D Per CPS 4002.01 Abnormal RPV Level/Loss of Feedwater at Power:
* Checks operation on the Power to Flow map
Per 3302.01 Reactor Recirculation (RR) Appendix A: RR Loop/Pump Shutdown and Isolation Hard Card:
* Notifies SRO MELLLA limit has being exceeded
Lowers RPV water level setpoint to ~ 31 inches Trips RR Pump B by opening RR 3B, 4B, or 5B (any one of the three as a minimum)
* Determines flow transient has resulted in entry into the OPRM Enable Region by observing the status of annunciator 5006-3D Per CPS 4002.01 Abnormal RPV Level/Loss of Feedwater at Power:
Shuts 1B33
* Per 3302.01 Reactor Recirculation (RR) Appendix A: RR Loop/Pump Shutdown and Isolation Hard Card:
-F023B, Pmp Suction Vlv BOP  Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
* Lowers RPV water level setpoint to ~ 31 inches
o Monitors reactor to ensure operations remain within established bands.
* Trips RR Pump B by opening RR 3B, 4B, or 5B (any one of the three as a minimum)
o -P 'steady' on both probes o Makes plant announcement o Demands an official 3D Monicore Case SRO  Acknowledges report from ATC.
* Shuts 1B33-F023B, Pmp Suction Vlv
Directs actions listed above Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
* Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
Reviews and enters Tech Spec 3.4.1 B.1 and C.1 Enters CPS 4008.01 Abnormal Reactor Coolant Flow Enters CPS 4100.02 Core Stability Control Directs ATC to scram the reactor if the restricted zone is entered of if core instabilities are observed.
BOP          o     Monitors reactor to ensure operations remain within established bands.
Enters CPS 4002.01 Abnormal RPV Level / Loss of Feedwater At Power   Directs ATC to monitor RPV Level and to scram if RPV level approaches 52" (Level 8).
o     Checks RR Vibration Monitor and determines RR Pump B Vibration is  20 mil P-P steady on both probes o     Makes plant announcement o     Demands an official 3D Monicore Case
o Directs lowering power below the MELLLA limit using reverse rod sequence or CRAM Rods within 15 minutes after plant is stable to be in compliance within 2 hours.
* Acknowledges report from ATC.
With the MELLLA Limit exceeded, enters ITS LCOs 3.2.1, 3.2.2, AND 3.2.3 o Informs Shift Manager.
SRO
o Conducts a brief.
* Directs actions listed above
Terminus: RR Pump B secured and Tech Spec review complete. NOTES:
* Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
ILT 15-1 NRC Exam Scenario 2  Rev. 1  ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 8 of 18 Operator Actions Event No.(s):
* Reviews and enters Tech Spec 3.4.1 B.1 and C.1
4  Page 1 of 1
* Enters CPS 4008.01 Abnormal Reactor Coolant Flow
* Enters CPS 4100.02 Core Stability Control
* Directs ATC to scram the reactor if the restricted zone is entered of if core instabilities are observed.
* Enters CPS 4002.01 Abnormal RPV Level / Loss of Feedwater At Power
* Directs ATC to monitor RPV Level and to scram if RPV level approaches 52 (Level 8).
o     Directs lowering power below the MELLLA limit using reverse rod sequence or CRAM Rods within 15 minutes after plant is stable to be in compliance within 2 hours.
* With the MELLLA Limit exceeded, enters ITS LCOs 3.2.1, 3.2.2, AND 3.2.3 o     Informs Shift Manager.
o     Conducts a brief.
Terminus: RR Pump B secured and Tech Spec review complete.
NOTES:
ILT 15-1 NRC Exam Scenario 2 Facility Approved           Page 7 of 18


== Description:==
ILT 15-1 NRC Exam Scenario 2                                                                                Rev. 1 Operator Actions Event No.(s):               4                                                                                Page      1    of    1


Reduce power with Control Rods Initiation: After RR Pump B has been secured Cues: Directed by SRO Time Position Applicant's Actions or Behavior Key Parameter Response
==
: Reactor Power , Rod Drive Parameters (flows, dP), Control Rods move as expected Expected Annunciato rs: None Automatic Actions
Description:==
: None ATC   Per CPS 3304.02 Rod Control and Information System (RC&IS), NF
Reduce power with Control Rods Initiation: After RR Pump B has been secured Cues: Directed by SRO Time         Position                                       Applicants Actions or Behavior Key Parameter Response: Reactor Power, Rod Drive Parameters (flows, dP), Control Rods move as expected Expected Annunciators: None Automatic Actions: None ATC
-CL-721-1002 Control Rod Move Sheets, and CPS 3005.01 Unit Power Changes section 8.2:
* Per CPS 3304.02 Rod Control and Information System (RC&IS), NF-CL-721-1002 Control Rod Move Sheets, and CPS 3005.01 Unit Power Changes section 8.2:
Reduces reactor power by inserting control rods to get below the MELLLA limit (< 67%). o Reduces reactor power to < 58% using control rod insertion when directed by SRO Monitors reactor to ensure operations remain within established bands.
* Reduces reactor power by inserting control rods to get below the MELLLA limit (<
67%).
o Reduces reactor power to < 58% using control rod insertion when directed by SRO
* Monitors reactor to ensure operations remain within established bands.
o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
BO P  Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
BOP
* Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
o Monitors reactor to ensure operations remain within established bands.
o Monitors reactor to ensure operations remain within established bands.
SRO Directs actions listed above Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
SRO
Positions himself/herself in proximity of the reactor operator, typically the location from which EOP actions are directed (OP-AA-300) o Notifies Shift Manager o Notifies TSO o Conducts a brief.
* Directs actions listed above
* Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
* Positions himself/herself in proximity of the reactor operator, typically the location from which EOP actions are directed (OP-AA-300) o Notifies Shift Manager o Notifies TSO o Conducts a brief.
Terminus: Clearly observable plant response from change in power level.
Terminus: Clearly observable plant response from change in power level.
NOTES:
ILT 15-1 NRC Exam Scenario 2 Facility Approved      Page 8 of 18


NOTES: 
ILT 15-1 NRC Exam Scenario 2                                                                             Rev. 1 Operator Actions Event No.(s):               5                                                                             Page     1 of   1
 
ILT 15-1 NRC Exam Scenario 2 Rev. 1 ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 9 of 18  Operator Actions Event No.(s):
5 Page 1 of 1
 
== Description:==


CCW Pump 1A Trip Initiation: Following Event 4 and upon direction of the Lead Examiner, insert REMOTE 3 Cues: Annunciator 5040
==
-1B Auto Trip Pump/Motor alarm.
Description:==
Time Position Applicant's Actions or Behavior Key Parameter Response:
CCW Pump 1A Trip Initiation: Following Event 4 and upon direction of the Lead Examiner, insert REMOTE 3 Cues: Annunciator 5040-1B Auto Trip Pump/Motor alarm.
Lowering CCW System Header Pressure Expected Annunciators:
Time         Position                                       Applicants Actions or Behavior Key Parameter Response: Lowering CCW System Header Pressure Expected Annunciators: 5040-1B Auto Trip Pump/Motor, 5003-3D RECIRC MTR A WDG CLG WTR FLOW LO, 5003-3K RECIRC MTR B WDG CLG WTR FLOW LO Automatic Actions: None ATC
5040-1B Auto Trip Pump/Motor, 5003
* Monitors reactor to ensure operations remain within established bands.
-3D RECIRC MTR A WDG CLG WTR FLOW LO , 5 003-3K RECIRC MTR B WDG CLG WTR FLOW LO Automatic Actions
o     Monitors control room panels, notifies SRO of unusual/unexpected conditions.
: None ATC   Monitors reactor to ensure operations remain within established bands.
o     Makes plant announcement.
o Monitors control room panels, notifies SRO of unusual/unexpected conditions.
o     Dispatches EO to investigate CCW Pump trip.
o Makes plant announcement. o Dispatches EO to investigate CCW Pump trip. o Monitors CCW Storage Tank Level. o Monitors RR Pump motor and seal parameters
o     Monitors CCW Storage Tank Level.
. BOP Reports issue to SRO. Refers to ARP. Per 5040-1B Auto Trip Pump/Motor alarm:
o     Monitors RR Pump motor and seal parameters.
Determines CCW Pump A has tripped. Determines CCW Pump B is running. Starts CCW Pump C. o Monitors CCW Storage Tank Level. o Dispatches EO to investigate
BOP
. SRO Acknowledges reports from BOP.
* Reports issue to SRO.
* Refers to ARP.
Per 5040-1B Auto Trip Pump/Motor alarm:
* Determines CCW Pump A has tripped.
* Determines CCW Pump B is running.
* Starts CCW Pump C.
o Monitors CCW Storage Tank Level.
o Dispatches EO to investigate.
SRO
* Acknowledges reports from BOP.
o Directs actions listed above.
o Directs actions listed above.
Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
* Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
o Informs Shift Manager.
o Informs Shift Manager.
o Contacts Maintenance to investigate. o Conducts a brief.
o Contacts Maintenance to investigate.
Terminus: CCW Pump 'B' running.
o Conducts a brief.
Terminus: CCW Pump B running.
NOTES:
NOTES:
ILT 15-1 NRC Exam Scenario 2  Rev. 1  ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 10 of 18 Operator Actions Event No.(s):
ILT 15-1 NRC Exam Scenario 2 Facility Approved       Page 9 of 18
6  Page 1 of 2


== Description:==
ILT 15-1 NRC Exam Scenario 2                                                                            Rev. 1 Operator Actions Event No.(s):               6                                                                            Page      1  of  2


RR Pump 'A' Trip / ATWS Initiation: Following Event 5 and upon direction of the Lead Examiner, insert REMOTE 4 Cues: Annunciator 5003
==
-1F RECIRC PMP A MTR BRKR TRIP Time Position Applicant's Actions or Behavior Key Parameter Response
Description:==
: Reactor Power, RPV Level Expected Annunciators
RR Pump A Trip / ATWS Initiation: Following Event 5 and upon direction of the Lead Examiner, insert REMOTE 4 Cues: Annunciator 5003-1F RECIRC PMP A MTR BRKR TRIP Time         Position                                         Applicants Actions or Behavior Key Parameter Response: Reactor Power, RPV Level Expected Annunciators: 5003-1F RECIRC PMP A MTR BRKR TRIP Automatic Actions: None ATC         o     Reports issue to SRO.
: 5003-1F RECIRC PMP A MTR BRKR TRIP Automatic Actions: None
* Monitors reactor to ensure operations remain within established bands.
[CT] ATC o Reports issue to SRO.
o     Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
Monitors reactor to ensure operations remain within established bands. o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
* Determines that no Recirculation Pumps are running with the Reactor Mode Switch in RUN (entry condition for CPS 4008.01 Abnormal Reactor Coolant Flow).
Determines that no Recirculation Pumps are running with the Reactor Mode Switch in RUN (entry condition for CPS 4008.01 Abnormal Reactor Coolant Flow).
Per CPS 5003-1F RECIRC PMP A MTR BRKR TRIP, CPS 4008.01 Abnormal Reactor Coolant Flow and CPS 4100.01 Reactor Scram:
Per CPS 5003-1F RECIRC PMP A MTR BRKR TRIP , CPS 4008.01 Abnormal Reactor Coolant Flow and CPS 4100.01 Reactor Scram: Places the mode switch in SHUTDOWN.
* Places the mode switch in SHUTDOWN.
Determines that Shutdown Criteria is not met. Arms and depresses Manual Scram Pushbuttons.
* Determines that Shutdown Criteria is not met.
[CT] Initiates ARI.
* Arms and depresses Manual Scram Pushbuttons.
Determines Shutdown Criteria is met. Carries out Scram Choreography by reporting:
                              * [CT] Initiates ARI.
Rod status is-Reactor power is- and trend Reactor pressure is- and trend Reactor level is- and trend Manual Scram and ARI have been initiated Any EOPs with entry conditions (no values required)
[CT]
IF RPV level is rising with 2 feed pumps operating, THEN Secures/verifies secured 1 Fe ed Pump and controls RPV water level between Level 3 and Level 8.
* Determines Shutdown Criteria is met.
* Carries out Scram Choreography by reporting:
* Rod status is
* Reactor power is and trend
* Reactor pressure is and trend
* Reactor level is and trend
* Manual Scram and ARI have been initiated
* Any EOPs with entry conditions (no values required)
* IF RPV level is rising with 2 feed pumps operating, THEN Secures/verifies secured 1 Feed Pump and controls RPV water level between Level 3 and Level 8.
o Verifies Turbine and Generator trip when required.
o Verifies Turbine and Generator trip when required.
o Shuts 1B33
o Shuts 1B33-F023A RR Pump A Suction Valve.
-F023A RR Pump A Suction Valve.
* Stabilizes Reactor Pressure 800 to 1065 or per directed band.
Stabilizes Reactor Pressure 800 to 1065 or per directed band.
* Performs EOP actions as directed by SRO.
Performs EOP actions as directed by SRO. BOP Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
BOP
o Monitors reactor to ensure operations remain within established bands. Per CPS 4100.01 Reactor Scram: Carries out Scram Choreography by:
* Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
Making an Announcement Reactor Scram Motor Driven Reactor Feed Pump may start Evacuate the RCIC room Evacuate the Containment Determines Rod status and reports shutdown criteria met to the SRO.
o     Monitors reactor to ensure operations remain within established bands.
Per CPS 4100.01 Reactor Scram:
* Carries out Scram Choreography by:
* Making an Announcement Reactor Scram Motor Driven Reactor Feed Pump may start Evacuate the RCIC room Evacuate the Containment Determines Rod status and reports shutdown criteria met to the SRO.
ILT 15-1 NRC Exam Scenario 2 Facility Approved      Page 10 of 18


ILT 15-1 NRC Exam Scenario 2 Rev. 1 ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 11 of 18
ILT 15-1 NRC Exam Scenario 2                                                                           Rev. 1 SRO
[CT] SRO  Acknowledges reports from ATC/BOP. Directs actions listed above. Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
* Acknowledges reports from ATC/BOP.
Enters and executes CPS 400 8.01 Abnormal Reactor Coolant Flow and CPS 4100.01 Reactor Scram Enters CPS 4100.01 Reactor Scram: o Directs ATC to scram the reactor. Carries out Scram Choreography by performing an Update:
* Directs actions listed above.
Update Entering EOP-1 Transitioning to EOP
* Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
-1A Entering the Scram Off
* Enters and executes CPS 4008.01 Abnormal Reactor Coolant Flow and CPS 4100.01 Reactor Scram Enters CPS 4100.01 Reactor Scram:
-Normal End of Update Enters EOP
o     Directs ATC to scram the reactor.
-1A, ATWS RPV Control, and directs the following:
* Carries out Scram Choreography by performing an Update:
o Inhibit ADS. [CT] Verifies ATC manually initiates ARI
* Update
. Determines Shutdown Criteria is met when ARI pushbuttons have been armed and depressed and transitions from EOP
* Entering EOP-1
-1A back to EOP
* Transitioning to EOP-1A
-1. Directs / Verifies performance of appropriate actions per EOP-1 RPV Control:
* Entering the Scram Off-Normal
Control of RPV pressure between 800 to 1065 psig with Bypass Valves or SRVs.
* End of Update Enters EOP-1A, ATWS RPV Control, and directs the following:
Control of RPV water level between Level 3 to Level 8 by using Preferred Injection Systems.
[CT]                        o     Inhibit ADS.
                              *      [CT] Verifies ATC manually initiates ARI.
* Determines Shutdown Criteria is met when ARI pushbuttons have been armed and depressed and transitions from EOP-1A back to EOP-1.
Directs / Verifies performance of appropriate actions per EOP-1 RPV Control:
* Control of RPV pressure between 800 to 1065 psig with Bypass Valves or SRVs.
* Control of RPV water level between Level 3 to Level 8 by using Preferred Injection Systems.
o Informs Shift Manager.
o Informs Shift Manager.
o Conducts a brief.
o Conducts a brief.
Terminus: Scram choreography complete. Rods manually inserted by initiating ARI.
Terminus: Scram choreography complete. Rods manually inserted by initiating ARI.
 
NOTES:
NOTES:
ILT 15-1 NRC Exam Scenario 2  Rev. 1  ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 12 of 18 Operator Actions Event No.(s):
ILT 15-1 NRC Exam Scenario 2 Facility Approved     Page 11 of 18
7 , 8  Page 1 of 2


== Description:==
ILT 15-1 NRC Exam Scenario 2                                                                            Rev. 1 Operator Actions Event No.(s):             7, 8                                                                            Page    1  of 2


Unisolable MSL 'D' Leak / Multiple Secondary Containment Areas above max safe temperatures requiring blowdown
==
/ MSIVs fail to close on Group 1 Isolation Signal Initiation: Following Event 6 and upon direction of the Lead Examiner, insert REMOTE 5 Cues: Multiple Aux Building Steam Tunnel High Temperature annunciators on 1H13
Description:==
-P601. Time Position Applicant's Actions or Behavior Key Parameter Respon se: Rising temperatures on 1TR
Unisolable MSL D Leak / Multiple Secondary Containment Areas above max safe temperatures requiring blowdown / MSIVs fail to close on Group 1 Isolation Signal Initiation: Following Event 6 and upon direction of the Lead Examiner, insert REMOTE 5 Cues: Multiple Aux Building Steam Tunnel High Temperature annunciators on 1H13-P601.
-CM326 & 327 Secondary Containment Temperature Recorder (multiple points).
Time         Position                                         Applicants Actions or Behavior Key Parameter Response: Rising temperatures on 1TR-CM326 & 327 Secondary Containment Temperature Recorder (multiple points).
Expected Annunciators
Expected Annunciators: Multiple annunciators on 1H13-P601 Automatic Actions: CRVICS Group 1, 4, 5, 6 isolations on High MSL Tunnel Ambient Temperature
: Multiple annunciators on 1H13
* Monitors reactor to ensure operations remain within established bands.
-P601 Automatic Actions
ATC o     Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
: CRVICS Group 1, 4, 5, 6 isolations on High MSL Tunnel Ambient Temperature
o     Reports EOP-8 entry on secondary containment area temperature above max normal.
 
* Performs EOP actions as directed by the SRO.
[CT] ATC  Monitors reactor to ensure operations remain within established bands.
o     Reports EOP entry conditions.
o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
o     Coordinates with BOP to monitor and control RPV level and pressure.
o Reports EOP
o    Performs a manual Group 1 Isolation of the MSLs and MSL Drains.
-8 entry on secondary containment area temperature above max normal.
[CT]                      Per EOP-8, Secondary Containment Control (will probably be BOP):
Performs EOP actions as directed by the SRO.
o [CT] Initiates ADS when directed by SRO.
o Reports EOP entry conditions.
* Verifies ADS actuation using the following indications:
o Coordinates with BOP to monitor and control RPV level and pressure.
o SPDS o DCS Display 122 (2H) [Acoustic Monitor Input]
o 1H13-P601/P642 Solenoid Indicator Lights o 1H13-P866 Valve Flow Monitor Control Panel o 1H13-P614 ADS Safety Valve Temperature recorder 1B21-R614 o Indirect indication via changes in RPV pressure, RPV level, MSL flows &
suppression pool temperatures.
* Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
BOP o Monitors reactor to ensure operations remain within established bands.
o Reports EOP-8 entry on secondary containment area temperature above max normal.
o Monitors and reports secondary containment temperatures on 1H13-P678 recorders 1TR-CM326 and 327 (may be performed by ATC/WEC).
o Determines that Group 1 MSL Isolation Valves failed to isolate on High MSL Tunnel temperature.
o Performs a manual Group 1 Isolation of the MSLs and MSL Drains.
o Performs a manual Group 1 Isolation of the MSLs and MSL Drains.
Per EOP-8, Secondary Containment Control (will probably be BOP): o [CT] Initiates ADS when directed by SRO.
o Reports to the SRO when two areas are above Max Safe temperatures per EOP-8, Secondary Containment Control (may be performed by ATC/WEC).
Verifies ADS actuation using the following indications:
o [CT] Initiates ADS when directed by the SRO.
[CT]
* Verifies ADS actuation using the following indications:
o SPDS o DCS Display 122 (2H) [Acoustic Monitor Input]
o SPDS o DCS Display 122 (2H) [Acoustic Monitor Input]
o 1H13-P601/P642 Solenoid Indicator Lights o 1H13-P866 Valve Flow Monitor Control Panel o 1H13-P614 ADS Safety Valve Temperature recorder 1B21
o 1H13-P601/P642 Solenoid Indicator Lights o 1H13-P866 Valve Flow Monitor Control Panel o 1H13-P614 ADS Safety Valve Temperature recorder 1B21-R614 o Indirect indication via changes in RPV pressure, RPV level, MSL flows &
-R614 o Indirect indication via changes in RPV pressure, RPV level, MSL flows & suppression pool temperatures.
suppression pool temperatures.
ILT 15-1 NRC Exam Scenario 2 Facility Approved      Page 12 of 18


[CT] BOP Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
ILT 15-1 NRC Exam Scenario 2                                                                          Rev. 1
o Monitors reactor to ensure operations remain within established bands.
* Acknowledges reports from ATC/BOP.
o Reports EOP
SRO
-8 entry on secondary containment area temperature above max normal.
* Ensures operations are conducted within the bounds of Tech Specs and IAW Operations standards and approved procedures.
o Monitors and reports secondary containment temperatures on 1H13
* Enters and executes EOP-8 Secondary Containment Control when ABST Temperatures have exceeded max normal values of EOP-8 Table T Area Temperature Limits.
-P678 recorders 1TR
* Directs BOP/ATC to perform a manual Group 1 Isolation
-CM326 and 327 (may be performed by ATC/WEC)
* Enters and executes EOP-3 Emergency RPV Depressurization when 2 or more of the following areas have exceeded max safe temperature values of EOP-8 Table T Area Temperature Limits:
. o Determines that Group 1 MSL Isolation Valves fail ed to isolate on High MSL Tunnel temperature. o Performs a manual Group 1 Isolation of the MSLs and MSL Drains.
* Point 14 1TR-CM326 (Upper Recorder) - Aux Bldg Below MS Tunnel > 200&deg;F
o Reports to the SRO when two areas are above Max Safe temperatures per EOP-8, Secondary Containment Control (may be performed by ATC/WEC). o [CT] Initiates ADS when directed by the SRO.
* Point 18 1TR-CM326 (Upper Recorder) - Aux Bldg Steam Tunnel > 200&deg;F
Verifies ADS actuation using the following indications:
* Point 15 or 16 1TR-CM327 (Lower Recorder) - Aux Bldg MSIV Room A or B >
o SPDS o DCS Display 122 (2H) [Acoustic Monitor Input]
200&deg;F
o 1H13-P601/P642 Solenoid Indicator Lights o 1H13-P866 Valve Flow Monitor Control Panel o 1H13-P614 ADS Safety Valve Temperature recorder 1B21
[CT]
-R614 o Indirect indication via changes in RPV pressure, RPV level, MSL flows & suppression pool temperatures.
                                          *    [CT] Directs initiation of ADS to blowdown the reactor.
o     Informs Shift Manager.
o     Conducts a brief.
Terminus: The scenario can be terminated when 7 SRVs have been opened and RPV water level is being maintained in accordance with EOP-1.
NOTES:
ILT 15-1 NRC Exam Scenario 2 Facility Approved      Page 13 of 18


ILT 15-1 NRC Exam Scenario 2 Rev. 1 ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 13 of 18     
ILT 15-1 NRC Exam Scenario 2                                                                         Rev. 1 Simulator Operator Instructions Initial Setup
 
[CT] SRO  Acknowledge s report s from ATC/BOP. Ensures operations are conducted within the bounds of Tech Specs and IAW Operations standards and approved procedures.
Enters and executes EOP
-8 Secondary Containment Control when ABST Temperatures have exceeded max normal values of EOP
-8 Table T Area Temperature Limits.
Directs BOP/ATC to perform a manual Group 1 Isolation Enters and executes EOP
-3 Emergency RPV Depressurization when 2 or more of the following areas have exceeded max safe temperature values of EOP
-8 Table T Area Temperature Limits
:  Point 14 1TR-CM326 (Upper Recorder) - Aux Bldg Below MS Tunnel > 200&deg;F Point 18 1TR
-CM326 (Upper Recorder) - Aux Bldg Steam Tunnel > 200&deg;F Point 15 or 16 1TR
-CM327 (Lower Recorder) - Aux Bldg MSIV Room A or B > 200&deg;F  [CT] Directs initiation of ADS to blowdown the reactor. o Informs Shift Manager.
o Conducts a brief
. Terminus: The scenario can be terminated when 7 SRVs have been opened and RPV water level is being maintained in accordance with EOP
-1.
NOTES:
ILT 15-1 NRC Exam Scenario 2  Rev. 1  ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 14 of 18    Simulator Operator Instructions Initial Setup
: 1. Fill out plant status and have Turnover Sheet ready for the crew.
: 1. Fill out plant status and have Turnover Sheet ready for the crew.
: 2. Verify daily lamp test completed.
: 2. Verify daily lamp test completed.
: 3. Reset to IC-222 (PW 76319) @ 99% Power. If this is the first reset after swapping simulator loads, reset the IC twice.
: 3. Reset to IC-222 (PW 76319) @ 99% Power. If this is the first reset after swapping simulator loads, reset the IC twice.
: 4. Load the lesson plan for this scenario.
: 4. Load the lesson plan for this scenario.
: 5. Verify the following commands are active: YP_XMFTB_4 963 Auto & Manual Scram Failure YP_XREMT_739 Defeat Group 1 Interlocks
: 5. Verify the following commands are active:
* YP_XMFTB_4963 Auto & Manual Scram Failure
* YP_XREMT_739 Defeat Group 1 Interlocks
: 6. Place simulator in RUN.
: 6. Place simulator in RUN.
: 7. Turn on and advance recorders.
: 7. Turn on and advance recorders.
: 8. Verify RCIC Flow Controller is set at 6 2 0 g pm. 9. Verify the AR/PR server is running and stabilize AR/PR.
: 8. Verify RCIC Flow Controller is set at 620 gpm.
: 10. Verify Rod Drive pressure is in the expected range of 235-265 psid. 11. Provide pull sheets:
: 9. Verify the AR/PR server is running and stabilize AR/PR.
Step 30 is in progress - Gang 10B is at Position 22
: 10. Verify Rod Drive pressure is in the expected range of 235-265 psid.
. 12. Make sure Sequence A is selected.
: 11. Provide pull sheets: Step 30 is in progress - Gang 10B is at Position 22.
: 12. Make sure Sequence A is selected.
: 13. Make sure Individual Drive Mode is selected on the OCM.
: 13. Make sure Individual Drive Mode is selected on the OCM.
: 14. Remove EST Tags from the following control switches:
: 14. Remove EST Tags from the following control switches:
1H13-P877-5014 - MC Pump 'B' 1H13-P877-5016 - 1TD004A RFPT 1A HP Stop Vlv Before SDV 1H13-P877-5019 - 1B21-BSFV-1 Aux Stm to MSR 1B Inlet Vlv 1H13-P877-5019 - 1GS02CB SPE Blower 1B2 1H13-P800-5042 - 0VQ03CC DW Prg Low Flow Exh Fan 1H13-P801-5050 - 1VY03C RHR Hx Rm A Sply Fan 1H13-P801-5050 - 1VY04C RCIC Pmp Rm Sply Fan 1H13-P801-5050 - 0VC69Y Locker Rm Exh Fan 11C Isol Dmpr 1H13-P801-5052 - 0VC70Y Locker Rm Exh Fan 11C Isol Dmpr 1H13-P601-5064 - 1SX011A Div 1 Cross Tie Valve 1H13-P601-5065 - 1SX011B Div 2 Cross Tie Valve 1H13-P601-5067 - 1B21-F067B MSL B Outbd MSIV Before Seat Drain Vlv
* 1H13-P877-5014 - MC Pump B
* 1H13-P877-5016 - 1TD004A RFPT 1A HP Stop Vlv Before SDV
* 1H13-P877-5019 - 1B21-BSFV-1 Aux Stm to MSR 1B Inlet Vlv
* 1H13-P877-5019 - 1GS02CB SPE Blower 1B2
* 1H13-P800-5042 - 0VQ03CC DW Prg Low Flow Exh Fan
* 1H13-P801-5050 - 1VY03C RHR Hx Rm A Sply Fan
* 1H13-P801-5050 - 1VY04C RCIC Pmp Rm Sply Fan
* 1H13-P801-5050 - 0VC69Y Locker Rm Exh Fan 11C Isol Dmpr
* 1H13-P801-5052 - 0VC70Y Locker Rm Exh Fan 11C Isol Dmpr
* 1H13-P601-5064 - 1SX011A Div 1 Cross Tie Valve
* 1H13-P601-5065 - 1SX011B Div 2 Cross Tie Valve
* 1H13-P601-5067 - 1B21-F067B MSL B Outbd MSIV Before Seat Drain Vlv
: 15. Procedures that are expected to be used during this scenario are:
: 15. Procedures that are expected to be used during this scenario are:
CPS 3110.01 Generator Stator Cooling (GC) (provided in the Crew Docs Notebook)
* CPS 3110.01 Generator Stator Cooling (GC) (provided in the Crew Docs Notebook)
CPS 3309.01 High Pressure Core Spray (HPCS)
* CPS 3309.01 High Pressure Core Spray (HPCS)
ITS 3.5.1 ECCS - Operating CPS 4008.01 Abnormal Reactor Coolant Flow CPS 4002.01 Abnormal RPV Level/Loss of Feedwater At Power CPS 3302.01 Reactor Recirculation (RR)
* ITS 3.5.1 ECCS - Operating
ITS 3.4.1 Recirculation Loops Operating CPS 3005.01 Unit Power Changes ITS 3.2.1 APLHGR ITS 3.2.2 MCPR ITS 3.2.3 LHGR EOP-1 RPV Control EOP-1A ATWS RPV Control EOP-3 Emergency RPV Depressurization (Blowdown)
* CPS 4008.01 Abnormal Reactor Coolant Flow
EOP-8 Secondary Containment Control CPS 4200.01 Auto Isolation
* CPS 4002.01 Abnormal RPV Level/Loss of Feedwater At Power
* CPS 3302.01 Reactor Recirculation (RR)
* ITS 3.4.1 Recirculation Loops Operating
* CPS 3005.01 Unit Power Changes
* ITS 3.2.1 APLHGR
* ITS 3.2.2 MCPR
* ITS 3.2.3 LHGR
* EOP-1 RPV Control
* EOP-1A ATWS RPV Control
* EOP-3 Emergency RPV Depressurization (Blowdown)
* EOP-8 Secondary Containment Control
* CPS 4200.01 Auto Isolation ILT 15-1 NRC Exam Scenario 2 Facility Approved  Page 14 of 18


ILT 15-1 NRC Exam Scenario 2 Rev. 1 ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 15 of 18 16. Hang OOS tags on: None 17. Identify T/S issues associated with OOS and turnover:
ILT 15-1 NRC Exam Scenario 2                                         Rev. 1
None 18. Operating Equipment: Make sure CCW Pumps 'A' and 'B' are running
: 16. Hang OOS tags on: None
: 19. Marked up copies: None 20. Verify simulator conditions match the turnover.
: 17. Identify T/S issues associated with OOS and turnover: None
: 18. Operating Equipment: Make sure CCW Pumps A and B are running
: 19. Marked up copies: None
: 20. Verify simulator conditions match the turnover.
ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 15 of 18


ILT 15-1 NRC Exam Scenario 2 Rev. 1 ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 16 of 18 Event Triggers and Role Play Event # 1. Shift Generator Stator Cooling Pumps (Pull up 1PL10J trouble alarms)
ILT 15-1 NRC Exam Scenario 2                                                                         Rev. 1 Event Triggers and Role Play Event #
: 1. Shift Generator Stator Cooling Pumps (Pull up 1PL10J trouble alarms)
: a. Event Trigger - Following shift turnover.
: a. Event Trigger - Following shift turnover.
: b. Role play :
: b. Role play :
(1) EO (If requested) a) (when asked to check local panel alarms on 1PL10J ) - acknowledge 1PL10J alarms and provide reports. b) (when asked to perform prestart checks for GC Pump A) - "Prestart checks are complete for GC Pump A. I'm standing by for pump start".
(1) EO (If requested) a)       (when asked to check local panel alarms on 1PL10J ) - acknowledge 1PL10J alarms and provide reports.
c) (when asked to check for GC Pump A locally) - "GC Pump A is running normally."
b)       (when asked to perform prestart checks for GC Pump A) - Prestart checks are complete for GC Pump A. Im standing by for pump start.
c)       (when asked to check for GC Pump A locally) - GC Pump A is running normally.
: 2. Spurious HPCS auto initiation
: 2. Spurious HPCS auto initiation
: a. Event Trigger - Following Even t 1 and when directed by the Lead Examiner , Activate Remote 1 and verify the following command(s):
: a. Event Trigger - Following Event 1 and when directed by the Lead Examiner, Activate Remote 1 and verify the following command(s):
(1) YP_XMFTB_4102 (HPCS Spurious Automatic Initiation
(1) YP_XMFTB_4102 (HPCS Spurious Automatic Initiation)
) b. Role play (1) Maintenance (if requested) - respond as dispatching personnel to investigate.
: b. Role play (1)   Maintenance (if requested) - respond as dispatching personnel to investigate.
(2) EO (when requested to check Div 3 DG and/or SX for proper operation) - wait 5 minutes and report that requested equipment is operating normally.
(2)   EO (when requested to check Div 3 DG and/or SX for proper operation) - wait 5 minutes and report that requested equipment is operating normally.
: 3. RR Pump B high vibration
: 3. RR Pump B high vibration
: a. Event Trigger - Following Event 2 and when directed by the Lead Examiner , Activate Remote 2 and verify the following command(s):
: a. Event Trigger - Following Event 2 and when directed by the Lead Examiner, Activate Remote 2 and verify the following command(s):
(1) A02_A0 1_02_10_TVM (5003-2K Recirc Pmp B Mtr Vibr Hi
(1) A02_A01_02_10_TVM (5003-2K Recirc Pmp B Mtr Vibr Hi).
). b. Role play: (1) If asked to check RR Pump vibration monitor - "RR Vibration Monitoring Computer shows RR Pump 'B' vibration indicates 21 mils and stable.
: b. Role play:
" 4. Reduce power with Control Rods a. Event Trigger - Following Event 3
(1)   If asked to check RR Pump vibration monitor - RR Vibration Monitoring Computer shows RR Pump B vibration indicates 21 mils and stable.
. b. Role play (1) If RE and/or Rod Verifier are requested - report to the MCR as the RE and/or Rod Verifier.
: 4. Reduce power with Control Rods
(2) If Chief Examiner requires additional power reduction, enter MCR as RE and recommend lowering power an additional 5% to provide additional margin to the MELLA Limit.
: a. Event Trigger - Following Event 3.
: 5. CCW Pump '1 A' Trip a. Event Trigger - When directed by the Lead Examiner , Activate Remote 3 and verify the following command(s):
: b. Role play (1)   If RE and/or Rod Verifier are requested - report to the MCR as the RE and/or Rod Verifier.
(2)   If Chief Examiner requires additional power reduction, enter MCR as RE and recommend lowering power an additional 5% to provide additional margin to the MELLA Limit.
: 5. CCW Pump 1A Trip
: a. Event Trigger - When directed by the Lead Examiner, Activate Remote 3 and verify the following command(s):
(1) YP_XMFTB_3917 CCW Pump 1A Trip
(1) YP_XMFTB_3917 CCW Pump 1A Trip
: b. Role play (1) EO a) (when asked to investigate trip of CCW Pump 'A') - "The breaker for CCW Pump 'A' is tripped on overcurrent and the motor is very hot to the touch."
: b. Role play (1)   EO a) (when asked to investigate trip of CCW Pump A) - The breaker for CCW Pump A is tripped on overcurrent and the motor is very hot to the touch.
b) (when asked to check for proper operation of CCW Pump 'C') - "The 'C' CCW Pump is operating normally."
b) (when asked to check for proper operation of CCW Pump C) - The C CCW Pump is operating normally.
ILT 15-1 NRC Exam Scenario 2 Facility Approved  Page 16 of 18


ILT 15-1 NRC Exam Scenario 2 Rev. 1 ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 17 of 18 6. RR Pump A Trip / ATWS
ILT 15-1 NRC Exam Scenario 2                                                                     Rev. 1
: a. Event Trigger - Following Event 5 and when directed by the Lead Examiner , Activate Remote 4 and verify the following command(s):
: 6. RR Pump A Trip / ATWS
(1) YP_XMFTB_4965 (RR02A-Recirc Pump A Trip
: a. Event Trigger - Following Event 5 and when directed by the Lead Examiner, Activate Remote 4 and verify the following command(s):
) b. Role play (1) Maintenance (after 2 minutes from scram announcement) - report to the MCR as IMD.
(1) YP_XMFTB_4965 (RR02A-Recirc Pump A Trip)
: 7. Unisolable MSL 'D' Leak into the Aux Building Steam Tunnel requiring blowdown
: b. Role play (1)   Maintenance (after 2 minutes from scram announcement) - report to the MCR as IMD.
: a. Event Trigger - Following Event 6 and when directed by the Lead Examiner , Activate Remote 5 and verify the following command(s):
: 7. Unisolable MSL D Leak into the Aux Building Steam Tunnel requiring blowdown
: a. Event Trigger - Following Event 6 and when directed by the Lead Examiner, Activate Remote 5 and verify the following command(s):
(1) YPXMALSE_256 0.08%, YVMSSILK_4 100%, YVMSSILK_8 100%, YPXMALSE_256 0.4% (after ATC places the RMS in Shutdown)
(1) YPXMALSE_256 0.08%, YVMSSILK_4 100%, YVMSSILK_8 100%, YPXMALSE_256 0.4% (after ATC places the RMS in Shutdown)
: b. Role play (1) WEC Supervisor (when requested to monitor secondary containment temperatures on P678 recorders 1TR
: b. Role play (1)   WEC Supervisor (when requested to monitor secondary containment temperatures on P678 recorders 1TR-CM326 and 327) - report to the MCR and report temperatures as directed by the SRO.
-CM326 and 327) - report to the MCR and report temperatures as directed by the SRO.
: 8. MSIVs fail to close on Group 1 isolation signal
: 8. MSIVs fail to close on Group 1 isolation signal
: a. Event Trigger - Initial condition
: a. Event Trigger - Initial condition
: b. Role play - none ILT 15-1 NRC Exam Scenario 2 Rev. 1  ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 18 of 18 Turnover 1. Day of week and shift
: b. Role play - none ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 17 of 18
 
ILT 15-1 NRC Exam Scenario 2                                                                   Rev. 1 Turnover
: 1.       Day of week and shift
: a. Today day shift
: a. Today day shift
: 2. Weather conditions
: 2.       Weather conditions
: a. Calm and clear.
: a. Calm and clear.
: 3. Plant power level
: 3.       Plant power level
: a. The plant is in Mode 1, operating at ~ 99% power.
: a. The plant is in Mode 1, operating at ~ 99% power.
: b. RR Pumps A and B are operating in fast speed with FCVs at 8 7%/89%. 34 36 MWt, 1130 MWe, 83.95 Mlbm/hr Core Flow.
: b. RR Pumps A and B are operating in fast speed with FCVs at 87%/89%. 3436 MWt, 1130 MWe, 83.95 Mlbm/hr Core Flow.
: c. Control rods - Step 30 / Gang 10B is at position 22.
: c. Control rods - Step 30 / Gang 10B is at position 22.
: 4. Thermal Limit Problems/Power Evolutions Power will be maintained at 99% throughout the shift. 5. LCO's in effect None 6. Surveillances in progress None 7. Status of Tagged Out Equipment None 8. Previous Shift Evolutions completed None 9. Evolutions planned for the shift Shift GC Pumps IAW CPS 3110.01 Generator Stator Cooling (GC) section 8.2.4 Shifting GC Water Pumps. 10. Risk Levels Green Protected Equipment: FC 'B'
: 4.       Thermal Limit Problems/Power Evolutions
: 11. Dose equivalent Iodine 131 reading 1.5 E
* Power will be maintained at 99% throughout the shift.
-6 curies per gram
: 5.       LCOs in effect
 
* None
ILT 15-1 NRC Exam Scenario 3  Rev. 1  ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 1 of 17  Exelon Nuclear ILT 15-1 NRC Exam
: 6.       Surveillances in progress
* None
: 7.       Status of Tagged Out Equipment
* None
: 8.       Previous Shift Evolutions completed
* None
: 9.       Evolutions planned for the shift
* Shift GC Pumps IAW CPS 3110.01 Generator Stator Cooling (GC) section 8.2.4 Shifting GC Water Pumps.
: 10.     Risk Levels
* Green
* Protected Equipment: FC B
: 11.     Dose equivalent Iodine 131
* reading 1.5 E-6 &#xb5;curies per gram ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 18 of 18


Scenario Number:   NRC Exam Scenario 3 Revision Number: 1 Date: 10/25/16  
ILT 15-1 NRC Exam Scenario 3                                                              Rev. 1 Exelon Nuclear ILT 15-1 NRC Exam Scenario Number:
NRC Exam Scenario 3 Revision Number: 1 Date: 10/25/16 Developed By:                    T. Jennings                  9/22/16 Instructor                Date Validated By:                    Michael Antonelli            10/28/16 SME or Instructor            Date Reviewed By:                      Jim Lucas                    11/15/16 Operations Representative        Date Approved By:                      T. Jennings                  11/15/16 Training Department            Date ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved  Page 1 of 17


Developed By:
ILT 15-1 NRC Exam Scenario 3                                                                             Rev. 1 Appendix D                                                 Scenario Outline                                 Form ES-D-1 Facility: Clinton Power Station                     Scenario No.: 3             Operating Test No.: 2017-301 Examiners: ____________________________                                     Operators: ____________________
T. Jennings 9/2 2/16  Instructor Date  Validated By:
Michael Antonelli 10/28/16  SME or Instructor Date  Reviewed By: Jim Lucas  11/15/16  Operations Representative Date  Approved By:
T. Jennings 11/15/16  Training Department Date ILT 15-1 NRC Exam Scenario 3 Rev. 1 ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 2 of 17 Appendix D Scenario Outline Form ES-D-1   Facility:
Clinton Power Station Scenario No.:
3                       Operating Test No.:
2017-301   Examiners: ____________________________
Operators: ____________________
____________________________                                                      ____________________
____________________________
____________________
Initial Conditions:
Initial Conditions:
Mode 1 at  
* Mode 1 at ~10% power.
~10% power. Weather conditions are calm and clear.
* Weather conditions are calm and clear.
SF System is secured to support surveillance testing.
* SF System is secured to support surveillance testing.
Turnover:
Turnover:
CPS 3002.01 Heatup and Pressurization is complete with the exception of placing a TDRFP in rolling standby (to be performed at 15% power).
* CPS 3002.01 Heatup and Pressurization is complete with the exception of placing a TDRFP in rolling standby (to be performed at 15% power).
CPS 3004.01 Turbine Startup and Generator Synchronization is in progress. Section 5.0 Prerequisites are complete. Steps 8.1.1 - 8.1.4 are complete.
* CPS 3004.01 Turbine Startup and Generator Synchronization is in progress. Section 5.0 Prerequisites are complete. Steps 8.1.1 - 8.1.4 are complete. Step 8.1.5 will be performed after placing a TDRFP in rolling standby.
Step 8.1.5 will be performed after placing a TDRFP in rolling standby
* On Step 12. Gang 3C is at position 48.
. On Step 12. Gang 3C is at position
* Priorities for the shift are as follows:
: 48. Priorities for the shift are as follows:
o Perform CPS 9061.03C012 Week 12 - CM, SF, SM, LD ISOL Valve Operability Checklist sections 8.12.6 and 8.12.7 (Method B). Position indication testing is NOT required. Do NOT restart SF after the completion of 9061.03C012/D012.
o Perform CPS 9061.03C012 Week 12  
o Continue with power ascension to 15% IAW Step 8.1.6 of CPS 3004.01. The RE has requested single rod, single notch rod motion. After reaching 15 % power:
- CM, SF, SM, LD ISOL Valve Operability Checklist sections 8.12.6 and 8.12.7 (Method B).
o Place TDRFP A in rolling standby IAW Step 8.6.3 of CPS 3002.01.
Position indication testing is NOT required.
o Perform Turbine Roll IAW Step 8.1.8 of CPS 3004.01.
Do NOT restart SF after the completion of 9061.03C012/D012.
Event                   Malf. No.                         Event                           Event No.                                                      Type*                       Description 1                         N/A                           N-BOP     Perform 9061.03C012 Week 12 - SF Valve Operability Checklist 2                         NA                           R-ATC     Raise power with rods to 15%.
o Continue with power ascension to 1 5% IAW Step 8.1.6 of CPS 3004.01. The RE has requested single rod, single notch rod motion.
3                                                       C-ATC ROD1233TFIA5                        TS-SRO     Uncoupled Rod 4                 Rod4433TFIA4                         C-ATC     Control Rod difficult to withdraw 5           A05_A02_A0204_1_TVM;                       C-BOP     RCIC failure to auto isolate on an isolation A05_A02_A09DS08_1                      TS-SRO      signal 6                 SA01B1SA1CFO                         C-BOP     #1 SA Compressor trips with failure of SA01B0SA1CFTC                                    Standby Compressor to Auto Start 7               Seismic_Value 0.25g                     M-All     Earthquake Multiple Annunciators Loss of Main Condenser vacuum YPXMALSE_239 YP_XMFTB_4963                                    ATWS 8               ed01LMalfMot(19)                       C-All     CRD Pump B Trips During ATWS
After reaching 15 % power:
  *           (N)ormal,   (R)eactivity,     (I)nstrument,   (C)omponent,   (M)ajor ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved  Page 2 of 17
o Place TDRFP 'A' in rolling standby IAW Step 8.6.3 of CPS 3002.01. o Perform Turbine Roll IAW Step 8.1.8 of CPS 3004.01.
Event No. Malf. No. Event Type* Event Description 1 N/A N-BOP Perform 9061.03C012 Week 12 - SF Valve Operability Checklist 2 NA R-ATC Raise power with rods to 15%. 3 ROD1233TFIA5 C-ATC TS-SRO Uncoupled Rod 4 Rod4433TFIA4 C-ATC Control Rod difficult to withdraw 5 A05_A02_A0204_1_TVM; A05_A02_A09DS08_1 C-BOP TS-SRO RCIC failure to auto isolate on an isolation signal 6 SA01B1SA1CFO SA01B0SA1CFTC C-BOP #1 SA Compressor trips with failure of Standby Compressor to Auto Start 7 Seismic_Value 0.25g Multiple Annunciators YPXMALSE_239 YP_XMFTB_4963 M-All Earthquake Loss of Main Condenser vacuum ATWS 8 ed01LMalfMot(19)
C-All CRD Pump 'B' Trips During ATWS
* (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor


ILT 15-1 NRC Exam Scenario 3 Rev. 1 ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 3 of 17 Appendix D Scenario Outline Form ES-D-1   Scenario No.:
ILT 15-1 NRC Exam Scenario 3                                                                   Rev. 1 Appendix D                                             Scenario Outline                           Form ES-D-1 Scenario No.:     2                                                                 Operating Test No.: 2017-301 Narrative Summary Event #                                                 Description
2                           Operating Test No.:
: 1. Perform 9061.03C012 Week 12 - SF Valve Operability Checklist The SRO directs BOP to perform CPS 9061.03C012 Week 12 - SF Valve Operability Checklist sections 8.12.6 and 8.12.7 (Method B).
2017-301 Narrative Summary Event # Description
: 2. Raise power with rods to 15%
: 1. Perform 9061.03C012 Week 12 - SF Valve Operability Checklist The SRO directs BOP to perform CPS 9061.03C012 Week 12 - SF Valve Operability Checklist sections 8.12.6 and 8.12.7 (Method B). 2. Raise power with rods to 15% The crew will continue the power ascension to 15% by withdrawing control rods in accordance with Step 8.1.6 of CPS 3004.01 Turbine Startup and Generator Synchronization. 3. Uncoupled rod When the first in
The crew will continue the power ascension to 15% by withdrawing control rods in accordance with Step 8.1.6 of CPS 3004.01 Turbine Startup and Generator Synchronization.
-sequence control rod (12-33) reaches position 48, the ATC will perform a coupling check IAW CPS 3304.02 Rod Control And Information System (RC&IS) section 8.1.10 Coupling Check by applying a continuous withdraw to the rod at position 48. Annunciator 5006
: 3. Uncoupled rod When the first in-sequence control rod (12-33) reaches position 48, the ATC will perform a coupling check IAW CPS 3304.02 Rod Control And Information System (RC&IS) section 8.1.10 Coupling Check by applying a continuous withdraw to the rod at position 48. Annunciator 5006-5G Rod Overtravel will be received, indicating that the control rod has become uncoupled from its drive mechanism. The operating crew will attempt to recouple the control rod IAW the annunciator response procedure. The SRO will evaluate and enter ITS 3.1.3 Condition C until the control rod is successfully recoupled.
-5G Rod Overtravel will be received, indicating that the control rod has become uncoupled from its drive mechanism. The operating crew will attempt to recouple the control rod IAW the annunciator response procedure. The SRO will evaluate and enter ITS 3.1.3 Condition C until the control rod is successfully recoupled.
: 4. Control Rod difficult to withdraw Control Rod 44-33 will not withdraw when using normal drive differential pressure. The crew will perform actions for a difficult to withdraw control rod IAW CPS 3304.01 Control Rod Hydraulic & Control (RD)
: 4. Control Rod difficult to withdraw Control Rod 44-33 will not withdraw when using normal drive differential pressure. The crew will perform actions for a difficult to withdraw control rod IAW CPS 3304.01 Control Rod Hydraulic & Control (RD)
Section 8.3.4 Control Rod Difficult to Withdraw. When drive dP is increased to 300 psid, the control rod withdrawal will be successful, allowing the power ascension to continue.
Section 8.3.4 Control Rod Difficult to Withdraw. When drive dP is increased to 300 psid, the control rod withdrawal will be successful, allowing the power ascension to continue.
: 5. RCIC failure to auto isolate on an isolation signal Annunciator 5063
: 5. RCIC failure to auto isolate on an isolation signal Annunciator 5063-4A RCIC DIV 2 STEAM LINE DIFF PRESS HIGH is received. BOP will observe that 1E51-F063 and F076 have failed to automatically shut and will manually shut them and trip the RCIC turbine. SRO will enter Tech Spec LCO 3.5.3 RCIC System Action A.1 and A.2, and LCO 3.3.6.1 Primary Containment and Drywell Isolation Instrumentation Action D.1.
-4A RCIC DIV 2 STEAM LINE DIFF PRESS HIGH is received. BOP will observe that 1E51-F063 and F076 have failed to automatically shut and will manually shut them and trip the RCIC turbine. SRO will enter Tech Spec LCO 3.5.3 RCIC System Action A.1 and A.2, and LCO 3.3.6.1 Primary Containment and Drywell Isolation Instrumentation Action D.1. 6. #1 SA Compressor trips with failure of Standby Compressor to Auto Start Annunciator 5041
: 6. #1 SA Compressor trips with failure of Standby Compressor to Auto Start Annunciator 5041-1A AUTO TRIP PUMP/MOTOR is received due to a trip of the #1 Service Air Compressor (1SA01C). The SRO will enter CPS 4004.01 Instrument Air Loss and direct the BOP to start the standby Service Air Compressor (0SA01C). If the crew fails to manually start 0SA01C, the air compressor will fail to automatically start to restore air pressure.
-1A AUTO TRIP PUMP/MOTOR is received due to a trip of the #1 Service Air Compressor (1SA01C). The SRO will enter CPS 4004.01 Instrument Air Loss and direct the BOP to start the standby Service Air Compressor (0SA01C). If the crew fails to manually start 0SA01C, the air compressor will fail to automatically start to restore air pressure.
: 7. Earthquake/Loss of Main Condenser Vacuum/ ATWS Annunciators 5009-1A ACCL EXCDED SAFE SHUTDN EARTHQKE, 5009-2A ACCL EXCDED SEIS SW/OPER BAS EARTHQKE, 5009-2B ACCL EXCDED OPER BAS EARTHQKE and 5009-3A ACTIVATED SEIS RCDR are received. SRO enters CPS 4301.01 Earthquake. BOP observes status lights on the Seismic Warning Panel and determines that a Safe Shutdown Earthquake (SSE) has been exceeded. The earthquake causes a vacuum leak in the Main Condenser. The MCR will take actions for degrading vacuum IAW CPS 4004.02 Loss of Vacuum. Efforts to determine the location of the vacuum leak will be unsuccessful. When it is determined that vacuum cannot be controlled above 24 Hg vac, the SRO will direct the ATC to perform a Rapid Plant Shutdown or to scram the reactor. When the ATC places the Reactor Mode Switch in shutdown/attempts manual scram or ARI, control rods fail to insert.
: 7. Earthquake/Loss of Main Condenser Vacuum/ ATWS Annunciators 5009
The SRO will enter EOP-1 RPV Control and transition to EOP-1A ATWS RPV Control. The SRO will direct the BOP to start SLC and the ATC to insert control rods per EOP-1A.
-1A ACCL EXCDED SAFE SHUTDN EARTHQKE, 5009
: 8. CRD Pump B trips during ATWS CRD Pump B will trip 15 seconds after the Reactor Mode Switch is placed in Shutdown during Event 7, causing a loss of Control Rod Hydraulic (RD) Drive pressure and inability to insert control rods. The Crew will take actions to restore RD Drive pressure by starting the A RD Pump.
-2A ACCL EXCDED SEIS SW/OPER BAS EARTHQKE, 5009
ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 3 of 17
-2B ACCL EXCDED OPER BAS EARTHQKE and 5009
-3A ACTIVATED SEIS RCDR are received. SRO enters CPS 4301.01 Earthquake. BOP observes status  


lights on the Seismic Warning Panel and determines that a Safe Shutdown Earthquake (SSE) has been exceeded. The earthquake causes a vacuum leak in the Main Condenser. The MCR will take actions for degrading vacuum IAW CPS 4004.02 Loss of Vacuum. Efforts to determine the location of the vacuum leak will be unsuccessful. When it is determined that vacuum cannot be controlled above 24" Hg vac, the SRO will direct the ATC to perform a Rapid Plant Shutdown or to scram the reactor. When the ATC places the Reactor Mode Switch in shutdown/attempts manual scram or ARI, control rods fail to insert.
ILT 15-1 NRC Exam Scenario 3                                                        Rev. 1 EOP 1, 1A Critical tasks:
The SRO will enter EOP
* RPV-6.1 BOP/ATC inserts control rods and/or starts Standby Liquid Control Pumps to shutdown the reactor.
-1 RPV Control and transition to EOP
* (Conditional) RPV-6.2 BOP Inhibits ADS (only if level challenges Level 1).
-1A ATWS RPV Control. The SRO will direct the BOP to start SLC and the ATC to insert control rods per EOP
* RPV-6.3 BOP and ATC terminates and prevents injection IAW Detail F1 to lower level to reduce subcooling or to lower level to decrease reactor power.
-1A. 8. CRD Pump B trips during ATWS CRD Pump 'B' will trip 15 seconds after the Reactor Mode Switch is placed in Shutdown during Event 7, causing a loss of Control Rod Hydraulic (RD) Drive pressure and inability to insert control rods. The Crew will take actions to restore RD Drive pressure by starting the 'A' RD Pump.
* RPV-6.3 BOP terminates and prevents injection from HPCS.
* RPV-6.4 ATC controls RPV level between TAF and -60 (PRA).
ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 4 of 17


ILT 15-1 NRC Exam Scenario 3 Rev. 1 ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 4 of 17 EOP 1, 1A  Critical tasks:
ILT 15-1 NRC Exam Scenario 3                                                                                   Rev. 1 Operator Actions Event No.(s):                1                                                                                 Page      1     of     1
RPV-6.1 BOP/ATC inserts control rods and/or starts Standby Liquid Control Pumps to shutdown the reactor.
(Conditional) RPV
-6.2 BOP Inhibits ADS (only if level challenges Level 1). RPV-6.3 BOP and ATC terminates and prevents injection IAW Detail F1 to lower level to reduce subcooling or to lower level to decrease reactor power.
RPV-6.3 BOP terminates and prevents injection from HPCS. RPV-6.4 ATC controls RPV level between TAF and
-60" (PRA).


ILT 15-1 NRC Exam Scenario 3  Rev. 1  ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 5 of 17  Operator Actions Event No.(s):
==
1  Page 1 of 1
Description:==
 
Perform 9061.03C012 Week 12 - SF Valve Operability Checklist (Method B).
== Description:==
Initiation: Following shift turnover and when directed by the Lead Examiner Cues: Directed by SRO Time         Position                                         Applicants Actions or Behavior General Note on Requirements for Expected Annunciator Response - OP-AA-103-102 If this evolution was pre-briefed and Expected Alarms were reviewed, the following expectations apply:
 
* Expected alarms will be flagged
Perform 9061.03C012 Week 12 - SF Valve Operability Checklist (Method B)
* When the annunciator comes in the operator will announce Expected Alarm
. Initiation: Following shift turnover and when directed by the Lead Examiner Cues: Directed by SRO Time Position Applicant's Actions or Behavior General Note on Requirements for "Expected Annunciator Response"
* The annunciator response procedure (ARP) need not be entered since it has already been reviewed in the pre-brief.
- OP-AA-103-102 If this evolution was pre
If a pre-brief was not conducted the operator should perform the following:
-briefed and "Expected Alarms" were reviewed, the following expectations apply:
* When an annunciator comes in the ARP should be referred to.
  "Expected alarms" will be flagged When the annunciator comes in the operator will announce "Expected Alarm" The annunciator response procedure (ARP) need not be entered since it has already been reviewed in the pre
* The annunciator may then be identified as an Expected Alarm, flagged, and from that point on the ARP need not be referred to.
-brief. If a pre-brief was not conducted the operator should perform the following:
Key Parameter Response: 1SF001, 1SF002, and 1SF004 valve position indication.
When an annunciator comes in the ARP should be referred to.
Expected Annunciators: 5041-7C NOT AVAILABLE SF SYSTEM DIVISION 1, 5041-7F NOT AVAILABLE SF SYSTEM DIVISION 2 Automatic Actions: None ATC
The annunciator may then be identified as an "Expected Alarm", flagged, and from that point on the ARP need not be referred t
* Monitors reactor to ensure operations remain within established bands.
: o. Key Parameter Response:
o   Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
1SF001, 1SF002, and 1SF004 valve position indication.
BOP
Expected Annunciators:
* Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
5041-7C NOT AVAILABLE SF SYSTEM DIVISION 1, 5041
o   Monitors reactor to ensure operations remain within established bands.
-7F NOT AVAILABLE SF SYSTEM DIVISION 2 Automatic Actions
IAW CPS 9061.03C012 Week 12 - SF Valve Operability Checklist section 8.12.6:
: None ATC   Monitors reactor to ensure operations remain within established bands.
* Places SF SYS DIV 1 IN TEST switch to TEST.
o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
* Performs open and close testing of 1SF001 and 1SF004; records data on D001.
BOP Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
* Places SF SYS DIV 1 IN TEST switch to NORMAL.
o Monitors reactor to ensure operations remain within established bands.
IAW CPS 9061.03C012 Week 12 - SF Valve Operability Checklist section 8.12.7:
IAW CPS 9061.03C012 Week 12 - SF Valve Operability Checklist section 8.12.6:
* Places SF SYS DIV 2 IN TEST switch to TEST.
Places SF SYS DIV 1 IN TEST switch to TEST.
* Performs open and close testing of 1SF002; records data on D001.
Performs open and close testing of 1SF001 and 1SF004; records data on D001. Places SF SYS DIV 1 IN TEST switch to NORMAL.
* Places SF SYS DIV 2 IN TEST switch to NORMAL.
IAW CPS 9061.03C012 Week 12 - SF Valve Operability Checklist section 8.12.7: Places SF SYS DIV 2 IN TEST switch to TEST.
SRO
Performs open and close testing of 1SF00 2; records data on D001. Places SF SYS DIV 2 IN TEST switch to NORMAL.
* Acknowledges reports from ATC/BOP.
SRO Acknowledges reports from ATC/BOP.
* Directs actions listed above.
Directs actions listed above. Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
* Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
Terminus: CPS 9061.03C012 Week 12 - SF Valve Operability Checklist sections 8.12.6 and 8.12.7 complete. NOTES:   
Terminus: CPS 9061.03C012 Week 12 - SF Valve Operability Checklist sections 8.12.6 and 8.12.7 complete.
NOTES:
* Solid bullets are required actions o      Hollow bullets are actions that may or may not be performed ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 5 of 17


Solid bullets are required actions o Hollow bullets are actions that may or may not be performed
ILT 15-1 NRC Exam Scenario 3                                                                                Rev. 1 Operator Actions Event No.(s):          2, 3, 4                                                                              Page    1    of    2


ILT 15-1 NRC Exam Scenario 3  Rev. 1  ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 6 of 17 Operator Actions Event No.(s):
==
2, 3, 4  Page 1 of 2
Description:==
 
Raise power with rods to 15% / Uncoupled Rod / Control Rod Difficult To Withdraw Initiation: Following Event 1 and upon direction of the SRO Cues: Annunciator 5006-5G Rod Overtravel, Control Rod 44-33 fails to move when withdraw signal is applied.
== Description:==
Time         Position                                         Applicants Actions or Behavior Key Parameter Response: Reactor power, Rod drive parameters (flow, dP), control rod position, Bypass Valve Position, rod uncoupled light on P680 OCM for control rod 12-33, Expected Annunciators: 5005-2K SRM Period, 5006-5G Rod Overtravel Automatic Actions: None
 
* Monitors reactor to ensure operations remain within established bands.
Raise power with rods to 15% / Uncoupled Rod / Control Rod Difficult To Withdraw Initiation: Following Event 1 and upon direction of the SRO Cues: Annunciator 5006
ATC o   Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
-5G Rod Overtravel, Control Rod 44
Reactivity Maneuver Per CPS 3004.01 Turbine Startup and Generator Synchronization, NF-CL-721-F-2 Control Rod Move Sheets and CPS 3304.02 RCIS:
-33 fails to move when withdraw signal is applied.
* Withdraws control rods (beginning with 12-33 from position 12) per the control rod sequence to raise power.
Time Position Applicant's Actions or Behavior Key Parameter Response
* Monitors nuclear instruments during rod movement.
: Reactor power, Rod drive parameters (flow, dP), control rod position, Bypass Valve Position, rod uncoupled light on P680 OCM for control rod 12
-33, Expected Annunciators
: 5005-2K SRM Period, 5006-5G Rod Overtravel Automatic Actions
: None ATC  Monitors reactor to ensure operations remain within established bands.
o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
Reactivity Maneuver Per CPS 3004.01 Turbine Startup and Generator Synchronization, NF
-CL-721-F-2 Control Rod Move Sheets and CPS 3304.02 RCIS:
Withdraws control rods (beginning with 12-33 from position
: 12) per the control rod sequence to raise power.
Monitors nuclear instruments during rod movement.
o Monitors the Power to Flow Map during power ascension.
o Monitors the Power to Flow Map during power ascension.
Performs a Coupling Check for any control rod(s) withdrawn to position 48.
* Performs a Coupling Check for any control rod(s) withdrawn to position 48.
Uncoupled Rod Per CPS 3304.02 Rod Control And Information System, section 8.1.10 Coupling Check:
Uncoupled Rod Per CPS 3304.02 Rod Control And Information System, section 8.1.10 Coupling Check:
After 12-33 is withdrawn to position 48, applies a continuous withdraw signal to verify rod coupling. Observes 5006-3G Rod Overtravel is received.
* After 12-33 is withdrawn to position 48, applies a continuous withdraw signal to verify rod coupling.
Observes red full
* Observes 5006-3G Rod Overtravel is received.
-out light for 12-33 goes out. Determines control rod 12-33 is uncoupled by pressing the ROD UNCOUPLED button on the P680 OCM.
* Observes red full-out light for 12-33 goes out.
Informs SRO that 12-33 is uncoupled and to refer to ITS 3.1.3.
* Determines control rod 12-33 is uncoupled by pressing the ROD UNCOUPLED button on the P680 OCM.
* Informs SRO that 12-33 is uncoupled and to refer to ITS 3.1.3.
Per CPS 3304.02 Rod Control And Information System, section 8.2.6:
Per CPS 3304.02 Rod Control And Information System, section 8.2.6:
Verifies that the INDIVID DRIVE light is energized on the OCM. If not, selects individual drive by depressing DRIVE MODE push
* Verifies that the INDIVID DRIVE light is energized on the OCM. If not, selects individual drive by depressing DRIVE MODE push-button.
-button. Inserts the drive 1 or 2 notches in an attempt to recouple the rod. Determines if the rod has recoupled by fully withdrawing the drive.
* Inserts the drive 1 or 2 notches in an attempt to recouple the rod.
Performs the coupling check and determines that the rod is recoupled.
* Determines if the rod has recoupled by fully withdrawing the drive.
o Initiates an Issue Report and contacts the Reactor Engineer regarding the uncoupled rod event. Control Rod Difficult To Withdraw Determines control rod 44
* Performs the coupling check and determines that the rod is recoupled.
-33 will not withdraw with normal drive water differential pressure. Informs SRO that 44
o     Initiates an Issue Report and contacts the Reactor Engineer regarding the uncoupled rod event.
-33 will not withdraw using normal drive water differential pressure.
Control Rod Difficult To Withdraw
* Determines control rod 44-33 will not withdraw with normal drive water differential pressure.
* Informs SRO that 44-33 will not withdraw using normal drive water differential pressure.
Per CPS 3304.01, Control Rod Hydraulic & Control (RD), Section 8.3.4:
Per CPS 3304.01, Control Rod Hydraulic & Control (RD), Section 8.3.4:
o Increases Drive Water Diff Press in ~ 50 psid increments to a maximum of 500 psid by throttling closed on C11
o Increases Drive Water Diff Press in ~ 50 psid increments to a maximum of 500 psid by throttling closed on C11-F003, CRD Press Control Valve to achieve the desired differential pressure (will probably be performed by BOP).
-F003, CRD Press Control Valve to achieve the desired differential pressure (will probably be performed by BOP).
* Attempts to withdraw rod 44-33 using normal notch withdrawal.
Attempts to withdraw rod 44-33 using normal notch withdrawal.
o Logs Drive Water Flow and Drive Water Diff Press.
o Logs Drive Water Flow and Drive Water Diff Press.
o Returns Drive Water Diff Press to normal (235 - 265 psid) using C11
o Returns Drive Water Diff Press to normal (235 - 265 psid) using C11-F003 (will probably be performed by BOP).
-F003 (will probably be performed by BOP).
ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved  Page 6 of 17


ILT 15-1 NRC Exam Scenario 3 Rev. 1 ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 7 of 17  BOP  Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
ILT 15-1 NRC Exam Scenario 3                                                                               Rev. 1
o Monitors reactor to ensure operations remain within established bands. Reactivity Maneuver o Monitors the Power to Flow Map during power ascension.
* Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
Uncoupled Rod o Initiates an Issue Report and contacts the Reactor Engineer regarding the uncoupled rod event. Control Rod Difficult To Withdraw Increases Drive Water Diff Press in ~ 50 psid increments to a maximum of 500 psid by throttling closed on C11
BOP o   Monitors reactor to ensure operations remain within established bands.
-F003, CRD Press Control Valve (may be performed by ATC).
Reactivity Maneuver o Monitors the Power to Flow Map during power ascension.
Throttles C11
Uncoupled Rod o Initiates an Issue Report and contacts the Reactor Engineer regarding the uncoupled rod event.
-F003 to restore drive water differential pressure to normal (235 - 265 psid) after control rod is successfully withdrawn (may be performed by ATC).
Control Rod Difficult To Withdraw
* Increases Drive Water Diff Press in ~ 50 psid increments to a maximum of 500 psid by throttling closed on C11-F003, CRD Press Control Valve (may be performed by ATC).
* Throttles C11-F003 to restore drive water differential pressure to normal (235 - 265 psid) after control rod is successfully withdrawn (may be performed by ATC).
o Logs Drive Water Flow and Drive Water Diff Press.
o Logs Drive Water Flow and Drive Water Diff Press.
SRO  Acknowledges reports from ATC/BOP.
* Acknowledges reports from ATC/BOP.
Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
SRO
* Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
o Informs Shift Manager.
o Informs Shift Manager.
o Conducts a brief.
o Conducts a brief.
Reactivity Maneuver Directs ATC to raise power to 15%. Maintains oversight during control rod movement; positioned in proximity to the ATC (typically from the SRO desk).
Reactivity Maneuver
Uncoupled Rod Verifies / directs ATC to attempt to recouple rod 12-33. Enters ITS 3.1.3 Action C.1 and C.2 to fully insert control rod 12-33 within 3 hours and disarm 12-33 within 4 hours.
* Directs ATC to raise power to 15%.
Exits ITS 3.1.3 Action C.1 and C.2 when 12-33 is successfully recoupled.
* Maintains oversight during control rod movement; positioned in proximity to the ATC (typically from the SRO desk).
Control Rod Difficult To Withdraw Verifies / directs ATC to perform CPS 3304.01 Control Rod Hydraulic and Control (RD) section 8.3.4 Control Rod Difficult To Withdraw.
Uncoupled Rod
o Directs continuing startup. Terminus: Clearly observable plant response from change in power level, control rod 12-33 recoupled and returned to position 48, successful withdrawal of control rod 28
* Verifies / directs ATC to attempt to recouple rod 12-33.
-33, and rod drive dP restored to normal (235 - 265 psid).
* Enters ITS 3.1.3 Action C.1 and C.2 to fully insert control rod 12-33 within 3 hours and disarm 12-33 within 4 hours.
* Exits ITS 3.1.3 Action C.1 and C.2 when 12-33 is successfully recoupled.
Control Rod Difficult To Withdraw
* Verifies / directs ATC to perform CPS 3304.01 Control Rod Hydraulic and Control (RD) section 8.3.4 Control Rod Difficult To Withdraw.
o Directs continuing startup.
Terminus: Clearly observable plant response from change in power level, control rod 12-33 recoupled and returned to position 48, successful withdrawal of control rod 28-33, and rod drive dP restored to normal (235 - 265 psid).
NOTES:
NOTES:
ILT 15-1 NRC Exam Scenario 3  Rev. 1  ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 8 of 17 Operator Actions  Event No.(s):
ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 7 of 17
5  Page 1 of 1
 
== Description:==


RCIC failure to auto isolate on an isolation signal Initiation: Following Event 4 and upon direction of the Lead Examiner, insert REMOTE 1. Cues: Annunciator 5063
ILT 15-1 NRC Exam Scenario 3                                                                          Rev. 1 Operator Actions Event No.(s):              5                                                                          Page    1    of   1
-4A RCIC Div 2 Steam Line Diff Press High alarm Time Position Applicant's Actions or Behavior Key Parameter Response:
Annunciator 5063
-4A RCIC Div 2 Steam Line Diff Press High alarm Expected Annunciators:
5063-4A RCIC Div 2 Steam Line Diff Press High alarm Automatic Actions: None (automatic isolation fails)
ATC   Monitors reactor to ensure operations remain within established bands.
o Monitors control room panels, notifies SRO of unusual/unexpected conditions.
o Makes plant announcement.
BOP  Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
o Monitors reactor to ensure operations remain within established bands.Reports issue to SRO. Refers to ARP.


==
Description:==
RCIC failure to auto isolate on an isolation signal Initiation: Following Event 4 and upon direction of the Lead Examiner, insert REMOTE 1.
Cues: Annunciator 5063-4A RCIC Div 2 Steam Line Diff Press High alarm Time        Position                                        Applicants Actions or Behavior Key Parameter Response: Annunciator 5063-4A RCIC Div 2 Steam Line Diff Press High alarm Expected Annunciators: 5063-4A RCIC Div 2 Steam Line Diff Press High alarm Automatic Actions: None (automatic isolation fails)
ATC
* Monitors reactor to ensure operations remain within established bands.
o    Monitors control room panels, notifies SRO of unusual/unexpected conditions.
o    Makes plant announcement.
BOP
* Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
o    Monitors reactor to ensure operations remain within established bands.Reports issue to SRO.
* Refers to ARP.
Per 5063-4A RCIC Div 2 Steam Line Diff Press High alarm:
Per 5063-4A RCIC Div 2 Steam Line Diff Press High alarm:
o Determines that a Group 5 isolation has not occurred. Manually initiates a Group 5 isolation by:
o Determines that a Group 5 isolation has not occurred.
Closing 1E51
* Manually initiates a Group 5 isolation by:
-F063, RHR & RCIC Stm Supp Inbd Isol Valve. o Verifying closed 1E51-F076, RHR & RCIC Stm Supp Warm Up Isol Valve. Tripping the RCIC turbine
* Closing 1E51-F063, RHR & RCIC Stm Supp Inbd Isol Valve.
. SRO Acknowledges report from BOP. Directs actions listed above.
o Verifying closed 1E51-F076, RHR & RCIC Stm Supp Warm Up Isol Valve.
Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
* Tripping the RCIC turbine.
Directs performing a Group 5 isolation. Reviews and enters ITS 3.5.3 A.1 and A.2, and 3.3.6.1 D.1. o Informs Shift Manager.
SRO
o Contacts maintenance to investigate. o Conducts a brief.
* Acknowledges report from BOP.
Terminus: Technical Specification review complete.
* Directs actions listed above.
* Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
* Directs performing a Group 5 isolation.
* Reviews and enters ITS 3.5.3 A.1 and A.2, and 3.3.6.1 D.1.
o Informs Shift Manager.
o Contacts maintenance to investigate.
o Conducts a brief.
Terminus: Technical Specification review complete.
NOTES:
NOTES:
ILT 15-1 NRC Exam Scenario 3  Rev. 1  ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 9 of 17 Operator Actions Event No.(s):
ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 8 of 17
6  Page 1 of 2


== Description:==
ILT 15-1 NRC Exam Scenario 3                                                                            Rev. 1 Operator Actions Event No.(s):               6                                                                            Page    1  of    2


Service Air Compressor (SAC) trip / failure of the standby SAC to auto start Initiation: Following Event 5 and upon direction of the Lead Examiner, insert REMOTE 2. Cues: Annunciator 5041
==
-1A, Auto Trip Pump/Motor Time Position Applicant's Actions or Behavior Key Parameter Response: SA header pressure decreases, 1SA01C amber trip light energized Expected Annunciators: 5041-1A Auto Trip Pump/Motor Automatic Actions: None ATC   Monitors reactor to ensure operations remain within established bands.
Description:==
o Monitors control room panels and notifies the SRO of any unusual or unexpected condition s. o Dispatches Equipment Operator to investigate.
Service Air Compressor (SAC) trip / failure of the standby SAC to auto start Initiation: Following Event 5 and upon direction of the Lead Examiner, insert REMOTE 2.
Cues: Annunciator 5041-1A, Auto Trip Pump/Motor Time         Position                                       Applicants Actions or Behavior Key Parameter Response: SA header pressure decreases, 1SA01C amber trip light energized Expected Annunciators: 5041-1A Auto Trip Pump/Motor Automatic Actions: None ATC
* Monitors reactor to ensure operations remain within established bands.
o   Monitors control room panels and notifies the SRO of any unusual or unexpected conditions.
o   Dispatches Equipment Operator to investigate.
Per CPS 4004.01 Instrument Air Loss:
Per CPS 4004.01 Instrument Air Loss:
o IF air pressure lowers to 60 psig and cannot be restored, or SDV level increases resulting in a rod block, or any control rod begins to drift, THEN turn mode switch to SHUTDOWN. BOP Monitors control room panels and notifies the SRO of any unusual or unexpected conditions.
o IF air pressure lowers to 60 psig and cannot be restored, or SDV level increases resulting in a rod block, or any control rod begins to drift, THEN turn mode switch to SHUTDOWN.
BOP
* Monitors control room panels and notifies the SRO of any unusual or unexpected conditions.
o Monitors reactor to ensure operations remain within established bands.
o Monitors reactor to ensure operations remain within established bands.
Determines that 1SA01C has tripped.
* Determines that 1SA01C has tripped.
Reports issue to SRO.
* Reports issue to SRO.
Refers to the ARP for 5041-1A. Per 5041-1A AUTO TRIP SERVICE AIR COMPRESSOR and CPS 4004.01 Instrument Air Loss:
* Refers to the ARP for 5041-1A.
Starts standby Service Air Compressor (0SA01C)
Per 5041-1A AUTO TRIP SERVICE AIR COMPRESSOR and CPS 4004.01 Instrument Air Loss:
(fails to Auto Start). Monitors SA Header Pressure.
* Starts standby Service Air Compressor (0SA01C) (fails to Auto Start).
* Monitors SA Header Pressure.
o Dispatches Equipment Operator to investigate cause of trip.
o Dispatches Equipment Operator to investigate cause of trip.
SRO Acknowledges report from BOP.
SRO
Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards, and approved procedures.
* Acknowledges report from BOP.
Enters and executes CPS 4004.01 Instrument Air Loss.
* Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards, and approved procedures.
Directs actions listed above.
* Enters and executes CPS 4004.01 Instrument Air Loss.
* Directs actions listed above.
o Informs Shift Manager.
o Informs Shift Manager.
o Contacts Maintenance to investigate.
o Contacts Maintenance to investigate.
o Conducts a brief.
o Conducts a brief.
Terminus: 0SA01C running and maintaining SA header pressure.
Terminus: 0SA01C running and maintaining SA header pressure.
 
NOTES:
NOTES:
ILT 15-1 NRC Exam Scenario 3  Rev. 1  ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 10 of 17 Operator Actions Event No.(s):
ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 9 of 17
7, 8  Page 1 of 3


== Description:==
ILT 15-1 NRC Exam Scenario 3                                                                          Rev. 1 Operator Actions Event No.(s):             7, 8                                                                          Page    1    of    3


Earthquake / Loss of Main Condenser vacuum / ATWS / CRD Pump 'B' Trips During ATWS Initiation: Following Event 6 and upon direction of the Lead Examiner, insert REMOTE 3. Cues: Multiple annunciators on 1H13
==
-P601 and P870 Time Position Applicant's Actions or Behavior Key Parameter Response
Description:==
: Lowering (degrading) Main Condenser Vacuum Expected Annunciators
Earthquake / Loss of Main Condenser vacuum / ATWS / CRD Pump B Trips During ATWS Initiation: Following Event 6 and upon direction of the Lead Examiner, insert REMOTE 3.
: 5009-1A ACCL EXCDED SAFE SHUTDN EARTHQKE, 5009
Cues: Multiple annunciators on 1H13-P601 and P870 Time         Position                                         Applicants Actions or Behavior Key Parameter Response: Lowering (degrading) Main Condenser Vacuum Expected Annunciators: 5009-1A ACCL EXCDED SAFE SHUTDN EARTHQKE, 5009-2A ACCL EXCDED SEIS SW/OPER BAS EARTHQKE, 5009-2B ACCL EXCDED OPER BAS EARTHQKE and 5009-3A ACTIVATED SEIS RCDR Automatic Actions: None ATC
-2A ACCL EXCDED SEIS SW/OPER BAS EARTHQKE, 5009
* Monitors reactor to ensure operations remain within established bands.
-2B ACCL EXCDED OPER BAS EARTHQKE and 5009
o    Monitors control room panels and notifies the SRO of any unusual or unexpected conditions.
-3A ACTIVATED SEIS RCDR Automatic Actions
* Reports receipt of annunciators 5009-1A, 2A, 2B, and 3A to the SRO.
: None    
o    Recognizes lowering Main Condenser Vacuum and notifies SRO.
Per CPS 4301.01 Earthquake, checks the following parameters:
* Reactor power, RPV pressure, RPV level
* Feed flow, Steam flow
* Generator load, Turbine vibration o Electrical distribution system integrity o Off-Gas, Area Radiation & Process Radiation Monitors o Leak detection systems o Balance of plant annunciators
* Reactor Feed Pump vibrations
* Reactor Recirculation Pump vibrations o Tank levels (MC, CY, DG Fuel Oil, etc.)
* Trip and isolation logic status Per 5007-2B/2D Low Vacuum LP Turb 1A/1B Exh Hood:
o Monitors condenser vacuum.
* Scrams the reactor when directed by the SRO.
* Carries out ATWS Scram Choreography by reporting the following:
* Mode Switch in shutdown, power is
* Shutdown Criteria is not met
* Reactor Power is  and trend
* Reactor Pressure is  and trend
* Reactor Level is  and trend
* Manual Scram and ARI have been initiated
* Any EOPs with entry conditions (EOP-1 on power)
* Arms and Depresses manual scram pushbuttons.
* Initiates ARI.
[CT]                      *    [CT] Inserts Control Rods per CPS 4411.08 & 4410.00C012 (only critical if SLC is not started).
[CT]                      *    [CT] Terminates and prevents injection from Condensate/Feedwater when directed by the SRO.
[CT]                      *    [CT] Controls level in Level Band B or C of EOP-1A (depending on whether BIT Override is met).
o    Reports critical parameters as required.
o   Coordinates with BOP to monitor and control RPV level and pressure.
ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 10 of 17


[CT]  [CT]  [CT]  ATC  Monitors reactor to ensure operations remain within established bands.
ILT 15-1 NRC Exam Scenario 3                                                                             Rev. 1 BOP
o Monitors control room panels and notifies the SRO of any unusual or unexpected conditions.
* Monitors control room panels and notifies the SRO of unusual or unexpected conditions.
Reports receipt of annunciators 5009-1A, 2A, 2B, and 3A to the SRO.
o   Monitors reactor to ensure operations remain within established bands.
o Recognizes lowering Main Condenser Vacuum and notifies SRO. Per CPS 4301.01 Earthquake, checks the following parameters:
o   Recognizes lowering Main Condenser Vacuum and notifies SRO.
Reactor power, RPV pressure, RPV level Feed flow, Steam flow Generator load, Turbine vibration o Electrical distribution system integrity o Off-Gas, Area Radiation & Process Radiation Monitors o Leak detection systems o Balance of plant annunciators Reactor Feed Pump vibrations Reactor Recirculation Pump vibrations o Tank levels (MC, CY, DG Fuel Oil, etc.)
o   Performs a Manual Group 1 Isolation when directed by the SRO.
Trip and isolation logic status Per 5007-2B/2D Low Vacuum LP Turb 1A/1B Exh Hood:
Per CPS 5009-1A, 2A, 2B and 3A and CPS 4301.01 Earthquake:
o Monitors condenser vacuum. Scrams the reactor when directed by the SRO. Carries out ATWS Scram Choreography by reporting the following:
* Verifies at Seismic Warning Panel 1H13-P865 (NOTE: This panel is only simulated at the simulator V-Panel in the back corner of the simulator):
Mode Switch in shutdown, power is-Shutdown Criteria is not met-  Reactor Power is - and trend Reactor Pressure is - and trend Reactor Level is - and trend Manual Scram and ARI have been initiated Any EOPs with entry conditions (EOP-1 on power)  Arms and Depresses manual scram pushbuttons. Initiates ARI.  [CT] Inserts Control Rods per CPS 4411.08
* SAFE SHUTDOWN EARTHQUAKE red light ON.
& 4410.00C012 (only critical if SLC is not started).  [CT] Terminates and prevents injection from Condensate/Feedwater when directed by the SRO.  [CT] Controls level in Level Band B or C of EOP
* 1VS-EM014 Contmnt 7120 red light ON.
-1A (depending on whether BIT Override is met). o Reports critical parameters as required. o Coordinates with BOP to monitor and control RPV level and pressure
* Operating Basis Equake red light ON.
.
* Seismic System Triggered red light ON.
ILT 15-1 NRC Exam Scenario 3 Rev. 1 ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 11 of 17     
* Determines that SSE level earthquake has been exceeded.
 
[CT] [CT]  [CT] BOP  Monitors control room panels and notifies the SRO of unusual or unexpected conditions. o Monitors reactor to ensure operations remain within established bands.
o Recognizes lowering Main Condenser Vacuum and notifies SRO. o Performs a Manual Group 1 Isolation when directed by the SRO.
Per CPS 5009-1A, 2A, 2B and 3A and CPS 4301.01 Earthquake: Verifies at Seismic Warning Panel 1H13-P865 (NOTE: This panel is only simulated at the simulator V
-Panel in the back corner of the simulator): SAFE SHUTDOWN EARTHQUAKE red light ON.
1VS-EM014 Contmnt 712'0" red light ON.
Operating Basis Equake red light O N. Seismic System Triggered red light ON.
Determines that SSE level earthquake has been exceeded.
Per CPS 4301.01 Earthquake, checks the following parameters:
Per CPS 4301.01 Earthquake, checks the following parameters:
Electrical distribution system integrity Off-Gas, Area Radiation & Process Radiation Monitors Leak detection systems Balance of plant annunciators o RPV pressure, RPV level, Steam flow o Generator load, Turbine vibration o Reactor Recirculation Pump vibrations Tank levels (MC, CY, DG Fuel Oil, etc.)
* Electrical distribution system integrity
o Trip and isolation logic status Directs Equipment Operators to perform visual inspection of plant equipment for damage. Performs ATWS scram choreography actions.
* Off-Gas, Area Radiation & Process Radiation Monitors
Announces:
* Leak detection systems
Reactor Scram with Failure to Scram Motor Driven Reactor Feed Pump may start Evacuate the RCIC room Evacuate the Containment Determines rod status and reports "Shutdown Criteria is not met" to SRO. Starts Control Rod Drive Pump 'A'.
* Balance of plant annunciators o RPV pressure, RPV level, Steam flow o Generator load, Turbine vibration o Reactor Recirculation Pump vibrations
[CT] Inhibits ADS when directed by SRO. [CT] Starts SLC (only critical if control rods are not inserted). [CT] Terminates and prevents injection of HPCS, RCIC (only performed and critical if NOT running), LPCS, & LPCI using hard cards at P601
* Tank levels (MC, CY, DG Fuel Oil, etc.)
.
o Trip and isolation logic status
ILT 15-1 NRC Exam Scenario 3  Rev. 1  ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 12 of 17    
* Directs Equipment Operators to perform visual inspection of plant equipment for damage.
* Performs ATWS scram choreography actions.
* Announces:
* Reactor Scram with Failure to Scram
* Motor Driven Reactor Feed Pump may start
* Evacuate the RCIC room
* Evacuate the Containment
* Determines rod status and reports Shutdown Criteria is not met to SRO.
* Starts Control Rod Drive Pump A.
[CT]                       *    [CT] Inhibits ADS when directed by SRO.
[CT]                      *    [CT] Starts SLC (only critical if control rods are not inserted).
                            *    [CT] Terminates and prevents injection of HPCS, RCIC (only performed and critical if
[CT]                      NOT running), LPCS, & LPCI using hard cards at P601.
ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 11 of 17


[CT] [CT] SRO  Acknowledges reports from ATC/BOP.
ILT 15-1 NRC Exam Scenario 3                                                                              Rev. 1
Determines that a valid seismic event has occurred.
* Acknowledges reports from ATC/BOP.
Directs performance of plant and MCR Panel walkdowns.
SRO
Enters and executes CPS 4301.01 Earthquake.
* Determines that a valid seismic event has occurred.
Enters and executes CPS 4004.02 Loss of Vacuum. o Notifies Engineering Duty Director / Manager that a seismic event has occurred and to perform CPS 1337.05 Seismic Response and Reporting.
* Directs performance of plant and MCR Panel walkdowns.
o Notifies Illinois Department of Natural Resources of the seismic event.
* Enters and executes CPS 4301.01 Earthquake.
o Notifies Shift Manager of the event. o Directs performance of CPS 1850.00 Post
* Enters and executes CPS 4004.02 Loss of Vacuum.
-Earthquake CPS Organizational Response to verify integrity of buildings systems and components.
o   Notifies Engineering Duty Director / Manager that a seismic event has occurred and to perform CPS 1337.05 Seismic Response and Reporting.
o Directs CMO to perform thermography on switchyard components and transformers, including bushings.
o   Notifies Illinois Department of Natural Resources of the seismic event.
o Makes preparations for performing an orderly plant shutdown.
o   Notifies Shift Manager of the event.
o Enters ORM 2.2.7 Seismic Monitoring Instrumentation Action 3.2.7.a, with one or more of the above seismic monitoring instruments inoperable for more than 30 days, initiate a Condition Report. Per CPS 4004.02 Loss of Vacuum:
o   Directs performance of CPS 1850.00 Post-Earthquake CPS Organizational Response to verify integrity of buildings systems and components.
When it is determined that Main Condenser Vacuum cannot be controlled above 24" Hg vacuum, directs ATC to place the Reactor Mode Switch in SHUTDOWN.
o   Directs CMO to perform thermography on switchyard components and transformers, including bushings.
o   Makes preparations for performing an orderly plant shutdown.
o   Enters ORM 2.2.7 Seismic Monitoring Instrumentation Action 3.2.7.a, with one or more of the above seismic monitoring instruments inoperable for more than 30 days, initiate a Condition Report.
Per CPS 4004.02 Loss of Vacuum:
* When it is determined that Main Condenser Vacuum cannot be controlled above 24 Hg vacuum, directs ATC to place the Reactor Mode Switch in SHUTDOWN.
o Directs a manual Group 1 Isolation to be performed.
o Directs a manual Group 1 Isolation to be performed.
Enters CPS 4100.01 Reactor Scram Carries out ATWS Scram Choreography by performing an Update:
Enters CPS 4100.01 Reactor Scram
Entering EOP
* Carries out ATWS Scram Choreography by performing an Update:
-1, transitioning to EOP-1A. Entering the Scram Off
* Entering EOP-1, transitioning to EOP-1A.
-Normal. End of Update.
* Entering the Scram Off-Normal.
Enters EOP
* End of Update.
-1A, ATWS RPV Control and directs:
Enters EOP-1A, ATWS RPV Control and directs:
Inhibiting ADS.
* Inhibiting ADS.
Initiating ARI. [CT] Terminate and Prevent injection of HPCS. [CT] Insertion of control rods per CPS 4411.08, and/or initiation of SLC per CPS 4411.10. Stabilization of RPV Pressure 800 to 1065 psig with Bypass Valves and SRVs. o Informs the Shift Manager.
* Initiating ARI.
o Conducts a brief.
                              *    [CT] Terminate and Prevent injection of HPCS.
Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
[CT]
Terminus: The scenario can be terminated when control rods are being inserted and RPV water level is being maintained in accordance with EOP-1A. NOTES:
                              *    [CT] Insertion of control rods per CPS 4411.08, and/or initiation of SLC per CPS
ILT 15-1 NRC Exam Scenario 3 Rev. 1 ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 13 of 17    Simulator Operator Instructions Initial Setup
[CT]
4411.10.
* Stabilization of RPV Pressure 800 to 1065 psig with Bypass Valves and SRVs.
o   Informs the Shift Manager.
o   Conducts a brief.
* Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
Terminus: The scenario can be terminated when control rods are being inserted and RPV water level is being maintained in accordance with EOP-1A.
NOTES:
ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 12 of 17
 
ILT 15-1 NRC Exam Scenario 3                                                                         Rev. 1 Simulator Operator Instructions Initial Setup
: 1. Fill out plant status and have Turnover Sheet ready for the crew.
: 1. Fill out plant status and have Turnover Sheet ready for the crew.
: 2. Verify daily lamp test completed.
: 2. Verify daily lamp test completed.
: 3. Reset to IC-223 (PW 76319) @ 10% Power. If this is the first reset after swapping simulator loads, reset the IC twice.
: 3. Reset to IC-223 (PW 76319) @ 10% Power. If this is the first reset after swapping simulator loads, reset the IC twice.
: 4. Load the lesson plan for this scenario.
: 4. Load the lesson plan for this scenario.
: 5. Verify the following commands are active: YP_XMFTB_4 963 Auto & Manual Scram Failure ROD4433TFIA4 Rod 44
: 5. Verify the following commands are active:
-33 Is Stuck At Present Location ROD1233TFIA5 Rod 12
* YP_XMFTB_4963 Auto & Manual Scram Failure
-33 Rod Uncoupled
* ROD4433TFIA4 Rod 44-33 Is Stuck At Present Location
* ROD1233TFIA5 Rod 12-33 Rod Uncoupled
: 6. Place simulator in RUN.
: 6. Place simulator in RUN.
: 7. Turn on and advance recorders.
: 7. Turn on and advance recorders.
: 8. Verify RCIC Flow Controller is set at 6 2 0 g pm. 9. Verify the AR/PR server is running and stabilize AR/PR.
: 8. Verify RCIC Flow Controller is set at 620 gpm.
: 10. Verify Rod Drive pressure is in the expected range of 235-265 psid. 11. Provide pull sheets: On step 12. Gang 3C is at position 48.
: 9. Verify the AR/PR server is running and stabilize AR/PR.
: 10. Verify Rod Drive pressure is in the expected range of 235-265 psid.
: 11. Provide pull sheets: On step 12. Gang 3C is at position 48.
: 12. Make sure Sequence A is selected.
: 12. Make sure Sequence A is selected.
: 13. Make sure Individual Drive Mode is selected on the OCM.
: 13. Make sure Individual Drive Mode is selected on the OCM.
: 14. Remove EST Tags from the following control switches:
: 14. Remove EST Tags from the following control switches:
1H13-P877-5014 - MC Pump 'B' 1H13-P877-5016 - 1TD004A RFPT 1A HP Stop Vlv Before SDV 1H13-P877-5019 - 1B21-BSFV-1 Aux Stm to MSR 1B Inlet Vlv 1H13-P877-5019 - 1GS02CB SPE Blower 1B2 1H13-P800-5042 - 0VQ03CC DW Prg Low Flow Exh Fan 1H13-P801-5050 - 1VY03C RHR Hx Rm A Sply F an  1H13-P801-5050 - 1VY04C RCIC Pmp Rm Sply Fan 1H13-P801-5050 - 0VC69Y Locker Rm Exh Fan 11C Isol Dmpr 1H13-P801-5052 - 0VC70Y Locker Rm Exh Fan 11C Isol Dmpr 1H13-P601-5064 - 1SX011A Div 1 Cross Tie Valve 1H13-P601-5065 - 1SX011B Div 2 Cross Tie Valve 1H13-P601-5067 - 1B21-F067B MSL B Outbd MSIV Before Seat Drain Vlv
* 1H13-P877-5014 - MC Pump B
* 1H13-P877-5016 - 1TD004A RFPT 1A HP Stop Vlv Before SDV
* 1H13-P877-5019 - 1B21-BSFV-1 Aux Stm to MSR 1B Inlet Vlv
* 1H13-P877-5019 - 1GS02CB SPE Blower 1B2
* 1H13-P800-5042 - 0VQ03CC DW Prg Low Flow Exh Fan
* 1H13-P801-5050 - 1VY03C RHR Hx Rm A Sply Fan
* 1H13-P801-5050 - 1VY04C RCIC Pmp Rm Sply Fan
* 1H13-P801-5050 - 0VC69Y Locker Rm Exh Fan 11C Isol Dmpr
* 1H13-P801-5052 - 0VC70Y Locker Rm Exh Fan 11C Isol Dmpr
* 1H13-P601-5064 - 1SX011A Div 1 Cross Tie Valve
* 1H13-P601-5065 - 1SX011B Div 2 Cross Tie Valve
* 1H13-P601-5067 - 1B21-F067B MSL B Outbd MSIV Before Seat Drain Vlv
: 15. Procedures that are expected to be used during this scenario are:
: 15. Procedures that are expected to be used during this scenario are:
CPS 3004.01 Heatup and Presurization CPS 9061.03C012/D012 Week 12 - CM, SF SM, LD ISOL Valve Operability CPS 3304.02 Rod Control and Information System (RC&IS)
* CPS 3004.01 Heatup and Presurization
ITS 3.1.3 Control Rod OPERABILITY CPS 3304.01 Control Rod Hydraulic & Control (RD)
* CPS 9061.03C012/D012 Week 12 - CM, SF SM, LD ISOL Valve Operability
CPS 4001.02 Automatic Isolation ITS 3.5.3 RCIC System ITS 3.3.6.1 Primary Containment and Drywell Isolation Instrumentation CPS 4004.01 Instrument Air Loss CPS 4301.01 Earthquake CPS 4004.02 Loss of Vacuum EOP-1 RPV Control EOP-1A ATWS RPV Control
* CPS 3304.02 Rod Control and Information System (RC&IS)
: 16. Hang OOS tags on: None ILT 15-1 NRC Exam Scenario 3  Rev. 1  ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 14 of 17 17. Identify T/S issues associated with OOS and turnover:
* ITS 3.1.3 Control Rod OPERABILITY
None 18. Operating Equipment:
* CPS 3304.01 Control Rod Hydraulic & Control (RD)
Verify 1SA01C is running  Verify Suppression Pool Cleanup (SF) is shutdown (pumps secured, SF001/2/4 SHUT)
* CPS 4001.02 Automatic Isolation
: 19. Marked up copies: None 20. Verify simulator conditions match the turnover.
* ITS 3.5.3 RCIC System
* ITS 3.3.6.1 Primary Containment and Drywell Isolation Instrumentation
* CPS 4004.01 Instrument Air Loss
* CPS 4301.01 Earthquake
* CPS 4004.02 Loss of Vacuum
* EOP-1 RPV Control
* EOP-1A ATWS RPV Control
: 16. Hang OOS tags on: None ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 13 of 17


ILT 15-1 NRC Exam Scenario 3 Rev. 1 ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 15 of 17 Event Triggers and Role Play Event # 1. Perform 9061.03C012 Week 12 - SF Valve Operability Checklist
ILT 15-1 NRC Exam Scenario 3                                                               Rev. 1
: 17. Identify T/S issues associated with OOS and turnover: None
: 18. Operating Equipment:
* Verify 1SA01C is running
* Verify Suppression Pool Cleanup (SF) is shutdown (pumps secured, SF001/2/4 SHUT)
: 19. Marked up copies: None
: 20. Verify simulator conditions match the turnover.
ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 14 of 17
 
ILT 15-1 NRC Exam Scenario 3                                                                          Rev. 1 Event Triggers and Role Play Event #
: 1. Perform 9061.03C012 Week 12 - SF Valve Operability Checklist
: a. Event Trigger - Following shift turnover.
: a. Event Trigger - Following shift turnover.
: b. Role play - none 2. Raise power with rods to 15%. a. Event Trigger - Following Event 1 and when directed by the SRO. b. Role play (1) Booth Operator - (when RE and/or Rod Verifier requested) - report to the MCR as the RE and/or Rod Verifier.
: b. Role play - none
: 3. Uncoupled Rod a. Event Trigger - When Rod12
: 2. Raise power with rods to 15%.
-33 is withdrawn to position 48.
: a. Event Trigger - Following Event 1 and when directed by the SRO.
: b. Role play (1) Booth Operator - When control rod 12-33 is inserted from position 48 , verify Delete ROD1233TFIA5 is inserted (Delete Rod 12
: b. Role play (1)   Booth Operator - (when RE and/or Rod Verifier requested) - report to the MCR as the RE and/or Rod Verifier.
-33 Malfunction
: 3. Uncoupled Rod
). 4. Control Rod Difficult To Withdraw
: a. Event Trigger - When Rod12-33 is withdrawn to position 48.
: a. Event Trigger - Following Event 3 when withdrawal of rod 44-33 is attempted
: b. Role play (1)   Booth Operator - When control rod 12-33 is inserted from position 48, verify Delete ROD1233TFIA5 is inserted (Delete Rod 12-33 Malfunction).
: (1) Verify ROD 4433TFIA4 is inserted (Rod 44-33 Is Stuck At Present Location).
: 4. Control Rod Difficult To Withdraw
: b. Role play (1) System Engineer (if asked about the performance / maintenance history of control rod 44
: a. Event Trigger - Following Event 3 when withdrawal of rod 44-33 is attempted:
-33) - "The seals for rod 44-33 were NOT replaced during the last outage. There are no previous problems noted in the history file for 44-33." 5. RCIC failure to auto isolate on an isolation signal
(1) Verify ROD4433TFIA4 is inserted (Rod 44-33 Is Stuck At Present Location).
: a. Event Trigger - When directed by the Lead Examiner , Activate Remote 1 and verify the following command(s):
: b. Role play (1)   System Engineer (if asked about the performance / maintenance history of control rod 44-33) - The seals for rod 44-33 were NOT replaced during the last outage. There are no previous problems noted in the history file for 44-33.
: 5. RCIC failure to auto isolate on an isolation signal
: a. Event Trigger - When directed by the Lead Examiner, Activate Remote 1 and verify the following command(s):
(1) A05_A02_A0204_1_TVM (2) A05_A02_A09DS08_1 On
(1) A05_A02_A0204_1_TVM (2) A05_A02_A09DS08_1 On
: b. Role play:
: b. Role play:
(1) Maintenance (if asked to investigate Div 2 Steam Line Diff Press High alarm malfunction) - "We'll send a technician to the control room to gather information for the troubleshooting plan."
(1) Maintenance (if asked to investigate Div 2 Steam Line Diff Press High alarm malfunction) - Well send a technician to the control room to gather information for the troubleshooting plan.
(2) If RCIC Flow ATMs are checked:
(2) If RCIC Flow ATMs are checked:
ATM Value Trip Status 1E31-N690B 100% (300" H 2O) (upscale)
ATM                                         Value                                 Trip Status 1E31-N690B                             100% (300 H 2 O) (upscale)                       Tripped 1E31-N683B                             100% (300 H 2 O) (upscale)                       Tripped 1E31-N690A                                   50% (0 H 2 O)                             Not tripped 1E31-N683A                                   50% (0 H 2 O)                             Not tripped 1E31-N691B                                   50% (0 H 2 O)                             Not tripped 1E31-N684B                                   50% (0 H 2 O)                             Not tripped 1E31-N691A                                   50% (0 H 2 O)                             Not tripped 1E31-N684A                                   50% (0 H 2 O)                             Not tripped ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 15 of 17
Tripped 1E31-N683B 100% (300" H 2O) (upscale)
Tripped 1E31-N690A 50% (0" H 2 O) Not tripped 1E31-N683A 50% (0" H 2 O) Not tripped 1E31-N691B 50% (0" H 2 O) Not tripped 1E31-N684B 50% (0" H 2 O) Not tripped 1E31-N691A 50% (0" H 2 O) Not tripped 1E31-N684A 50% (0" H 2 O) Not tripped


ILT 15-1 NRC Exam Scenario 3 Rev. 1 ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 16 of 17 6. #1 SA Compressor trips with failure of Standby Compressor to Auto Start
ILT 15-1 NRC Exam Scenario 3                                                                               Rev. 1
: 6.     #1 SA Compressor trips with failure of Standby Compressor to Auto Start
: a. Event Trigger - Following Event 5 and when directed by the Lead Examiner, Activate Remote 2 and verify the following command(s):
: a. Event Trigger - Following Event 5 and when directed by the Lead Examiner, Activate Remote 2 and verify the following command(s):
(1) SA01B1SA1CFO (2) SA01B0SA1CFTC
(1) SA01B1SA1CFO (2) SA01B0SA1CFTC
: b. Role play (If requested):
: b. Role play (If requested):
(1) Maintenance (investigate loss of service air pressure or failure of compressor to start) - Report, "I will brief and dispatch personnel to investigate".
(1)   Maintenance (investigate loss of service air pressure or failure of compressor to start) - Report, I will brief and dispatch personnel to investigate.
(2) EO (investigate trip of 1SA01C) - Report, "The breaker for 1SA01C is tripped on overcurrent. There are no abnormalities locally. 0SA01C is operating normally."
(2)   EO (investigate trip of 1SA01C) - Report, The breaker for 1SA01C is tripped on overcurrent. There are no abnormalities locally. 0SA01C is operating normally.
(3) EO (if directed to support shifting standby Service Air Compressors - acknowledge the order and report, "I'm on my way up to get a brief".
(3)   EO (if directed to support shifting standby Service Air Compressors - acknowledge the order and report, Im on my way up to get a brief.
: 7. Earthquake / Loss of Main Condenser vacuum / ATWS
: 7. Earthquake / Loss of Main Condenser vacuum / ATWS
: a. Event Trigger - Following Event 6 and when directed by the Lead Examiner , Activate Remote 3 and verify the following command(s):
: a. Event Trigger - Following Event 6 and when directed by the Lead Examiner, Activate Remote 3 and verify the following command(s):
(1) SEISMIC_VALUE 0.25g (2) A04_ A08_02_1_TVM (3) A04_ A0 5_01_4_TVM (4) A04_ A0 5_01_3_TVM b. Role play (1) Security (if asked if ground motion felt): "I've had several security officers report that ground motion was felt".
(1) SEISMIC_VALUE 0.25g (2) A04_ A08_02_1_TVM (3) A04_ A05_01_4_TVM (4) A04_ A05_01_3_TVM
(2) EO (when directed to investigate loss of condenser vacuum): "I will verify Travelling Screens/Screenwash operating properly and verify the Vacuum Breaker Loop Seal is filled."
: b. Role play (1)   Security (if asked if ground motion felt): Ive had several security officers report that ground motion was felt.
(3) EO (if asked to check RFP Seal Tank Level) - "1LIC-TD040 is in auto; level is in the green band controlling at 10". (4) EO (if asked to make preparations to startup a Condenser Vacuum Pump): "I'm on my way to the WEC office for a brief".
(2)   EO (when directed to investigate loss of condenser vacuum): I will verify Travelling Screens/Screenwash operating properly and verify the Vacuum Breaker Loop Seal is filled.
(5) Booth operator (when asked to defeat ATWS interlocks per 4410.00C012 Defeating ATWS Interlocks) - defeat the following isolations (using the ATWS actions in the simulator lesson plan) in the order provided by the ATC: a) Defeat IA Isolations b) Defeating RPS Logic Trips c) Defeating Rod Pattern Controller d) Defeating ARI Logic Trips (6) Maintenance (after 2 minutes from scram announcement) - report to the MCR as IMD.
(3)   EO (if asked to check RFP Seal Tank Level) - 1LIC-TD040 is in auto; level is in the green band controlling at 10.
: 8. CRD Pump 'B' Trips During ATWS
(4)   EO (if asked to make preparations to startup a Condenser Vacuum Pump): Im on my way to the WEC office for a brief.
(5)   Booth operator (when asked to defeat ATWS interlocks per 4410.00C012 Defeating ATWS Interlocks) - defeat the following isolations (using the ATWS actions in the simulator lesson plan) in the order provided by the ATC:
a)         Defeat IA Isolations b)         Defeating RPS Logic Trips c)         Defeating Rod Pattern Controller d)         Defeating ARI Logic Trips (6)   Maintenance (after 2 minutes from scram announcement) - report to the MCR as IMD.
: 8. CRD Pump B Trips During ATWS
: a. Event Trigger - Triggered when RMS is placed in shutdown during event 7.
: a. Event Trigger - Triggered when RMS is placed in shutdown during event 7.
: b. Role play (1) EO (when directed to open 1C11
: b. Role play (1)   EO (when directed to open 1C11-F116, Suct Filt Bypass and 1C11-F117, Suct Filt Bypass for 4411.08):
-F116, Suct Filt Bypass and 1C11
1C11-F116 and 1C11-F117 are open.)
-F117, Suct Filt Bypass for 4411.08): "1C11-F116 and 1C11
(2)   EO (when directed to shut/verify shut 1C11-F014A, Pump A Stop Chk Discharge Valve for 4411.08): Insert YP_XREMT_697 Normal and report, 1C11-F014A is shut.
-F117 are open.")
(3)   EO (when directed to open 1C11-F014A, Pump A Stop Chk Discharge Valve for 4411.08): Insert YP_XREMT_697 Open and report, 1C11-F014A is open.
(2) EO (when directed to shut
ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 16 of 17
/verify shut 1C11
 
-F014 A, Pump A Stop Chk Discharge Valve for 4411.08): Insert YP_XREMT_697 Normal and report, "1C11-F014 A is shut." (3) EO (when directed to open 1C11
ILT 15-1 NRC Exam Scenario 3                                                                         Rev. 1 Turnover
-F014 A, Pump A Stop Chk Discharge Valve for 4411.08): Insert YP_XREMT_697 Open and report, "1C11-F014 A is open."
: 1.       Day of week and shift
ILT 15-1 NRC Exam Scenario 3 Rev. 1 ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 17 of 17 Turnover 1. Day of week and shift Today day shift
* Today day shift
: 2. Weather conditions Calm and clear.
: 2.       Weather conditions
: 3. Plant power level The plant is in Mode 1, operating at ~
* Calm and clear.
10% power. RR Pumps A and B are operating in slow speed with FCVs at 90%/90%. 346 MWt, 0 MWe, 27.3 Mlbm/hr Core Flow.
: 3.       Plant power level
CPS 3002.01 Heatup and Pressurization is complete with the exception of placing a TDRFP in rolling standby (to be performed at 15% power).
* The plant is in Mode 1, operating at ~ 10% power.
CPS 3004.01 Turbine Startup and Generator Synchronization is in progress. Section 5.0 Prerequisites are complete. Steps 8.1.1 - 8.1.5 are complete.
* RR Pumps A and B are operating in slow speed with FCVs at 90%/90%. 346 MWt, 0 MWe, 27.3 Mlbm/hr Core Flow.
Control rods - On Step 12. Gang 3C is at position 48.
* CPS 3002.01 Heatup and Pressurization is complete with the exception of placing a TDRFP in rolling standby (to be performed at 15% power).
MDRFP is on the MLC in automatic.
* CPS 3004.01 Turbine Startup and Generator Synchronization is in progress. Section 5.0 Prerequisites are complete. Steps 8.1.1 - 8.1.5 are complete.
: 4. Thermal Limit Problems/Power Evolutions Continue with power ascension to 15% IAW Step 8.1.6 of CPS 3004.01. The RE has requested single rod, single notch rod motion. After reaching 15% power:
* Control rods - On Step 12. Gang 3C is at position 48.
Place TDRFP 'A' in rolling standby IAW Step 8.6.3 of CPS 3002.01.
* MDRFP is on the MLC in automatic.
Perform Turbine Roll IAW Step 8.1.8 of CPS 3004.01.
: 4.       Thermal Limit Problems/Power Evolutions
: 5. LCO's in effect None 6. Surveillances in progress CPS 9061.03C012/D012 - Week 12 - SF Valve Operability Checklist
* Continue with power ascension to 15% IAW Step 8.1.6 of CPS 3004.01. The RE has requested single rod, single notch rod motion. After reaching 15% power:
: 7. Status of Tagged Out Equipment None 8. Previous Shift Evolutions completed SF System was secured to support performance of CPS 9061.03C012/D012. 9. Evolutions planned for the shift Priority 1 - Perform CPS 9061.03C012 Week 12 - CM, SF, SM, LD ISOL Valve Operability Checklist sections 8.12.6 and 8.12.7 (Method B). Position indication testing is NOT required. Do NOT restart SF after the completion of 9061.03C012/D012.
* Place TDRFP A in rolling standby IAW Step 8.6.3 of CPS 3002.01.
Priority 2 - Continue with power ascension to 1 5% IAW Step 8.1.6 CPS 3004.01.
* Perform Turbine Roll IAW Step 8.1.8 of CPS 3004.01.
: 10. Risk Levels Green Protected Equipment: FC 'B'
: 5.       LCOs in effect
: 11. Dose equivalent Iodine 131 Reading 1.5 E-6 curies per gram.}}
* None
: 6.       Surveillances in progress
* CPS 9061.03C012/D012 - Week 12 - SF Valve Operability Checklist
: 7.       Status of Tagged Out Equipment
* None
: 8.       Previous Shift Evolutions completed
* SF System was secured to support performance of CPS 9061.03C012/D012.
: 9.       Evolutions planned for the shift
* Priority 1 - Perform CPS 9061.03C012 Week 12 - CM, SF, SM, LD ISOL Valve Operability Checklist sections 8.12.6 and 8.12.7 (Method B). Position indication testing is NOT required. Do NOT restart SF after the completion of 9061.03C012/D012.
* Priority 2 - Continue with power ascension to 15% IAW Step 8.1.6 CPS 3004.01.
: 10.     Risk Levels
* Green
* Protected Equipment: FC B
: 11.     Dose equivalent Iodine 131
* Reading 1.5 E-6 &#xb5;curies per gram.
ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 17 of 17}}

Latest revision as of 18:58, 4 February 2020

2017 Clinton Power Station Initial Licensed Operator Examination Proposed Operating Test
ML17108A444
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/09/2017
From: Chuck Zoia
Operations Branch III
To:
Exelon Generation Co, Exelon Nuclear
Shared Package
ML16308A466 List:
References
50-461/17-301
Download: ML17108A444 (307)


Text

CLINTON POWER STATION Job Performance Measure Complete an SRV Actuation Report JPM Number: JPM407 Revision Number: 02 Date: 8/25/16 Developed By: T. Jennings 8/25/16 Instructor Date Validated By: Michael Antonelli 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: Tony Jennings 11/15/16 Training Department Date JPM407_R02 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 3831.01 Rev: 6b Procedure CPS 3831.01D002 Rev: 6 Procedure CPS 3831.01F001 Rev: 4

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 NA New JPM number and updated revisions (10110001SAF01) 01 2/22/11 Updated for procedure revision.

02 8/23/16 Updated procedure references and made editorial changes throughout.

Page 3 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. No simulator setup is required for this JPM.

Page 4 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • The SRV actuation report is correctly filled out and SRV B21-F047A has been identified as leaking.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS 9056.02, SAFETY/RELIEF VALVE ACTUATION TEST Rev. 29b
  • CPS 3831.01D002 ACTUATION LOG Rev. 6
  • CPS 3831.01F001 COMMENT SHEET Rev. 4 EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • Provide the examinee with the following items:

o Initial Conditions and Initiating Cue page (page 14 of the JPM) o SRV Tailpipe Temperature Graph (page 15 of the JPM) o DCS Display 6D-04 (page 16 of the JPM) o DCS Display D05AD1 (page 17 of the JPM) o DCS Display DD5BD3 (page 18 of the JPM) o CPS 3831.01 Safety Relief Valve Report Rev. 6b (blank) o CPS 3831.01D002 Actuation Log Rev. 6 (with block 310 marked NA) o CPS 3831.01F001 Comment Sheet Rev. 4 (blank)

  • All pre-job briefings are completed.

Page 5 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the B RO on dayshift.

The unit is operating at 80% power.

CPS 9056.02 SAFETY/RELIEF VALVE ACTUATION TEST was performed on B21-F047A on the previous shift (midshift) during steady state operations.

During the test, B21-F047A was opened at 0027 for 1 minute 0 seconds.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

§ Do NOT shine any type light into a panel.

The CRS has provided you with the following data sheets:

  • SRV B21-F047A tailpipe temperature graph
  • Pre-test and Post-test screen shots of PPC screens 6D-04 (IRM/APRM indications), D05AD1 (SPDS Summary Display), and DD5BD3 (SPDS RPV, Pri-Cnmt, and Hydrogen Display)

The CRS has marked block 310 of CPS 3831.01D002 Actuation Log NA.

The CRS has directed you to complete CPS 3831.01 Safety Relief Valve Report for 1B21-F047A.

START TIME:

Page 6 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 3831.01 Safety Relief Valve Report Section 8.0 Procedure CPS 3831.01D002 Actuation Log JPM Step 1 Fill in block 302 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records B21-F047A in block 302.

Cue:

Comments SAT £ UNSAT £ Comment Number JPM Step 2 Fill in block 303 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records todays date in block 303.

Cue:

Comments SAT £ UNSAT £ Comment Number Page 7 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JPM Step 3 Fill in block 304 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records 0027 in block 304.

Cue:

Comments SAT £ UNSAT £ Comment Number

  • JPM Step 4 Fill in block 305 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records B in block 305.

Cue:

Comments SAT £ UNSAT £ Comment Number

  • JPM Step 5 Fill in block 306 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records C in block 306.

Cue:

Comments SAT £ UNSAT £ Comment Number Page 8 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

  • JPM Step 6 Fill in block 307 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records E in block 307.

Cue:

Comments SAT £ UNSAT £ Comment Number JPM Step 7 Fill in block 308 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records 80% in block 308.

Cue:

Comments SAT £ UNSAT £ Comment Number

  • JPM Step 8 Fill in block 309 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee determines that the tailpipe temperature for B21-F047A has not returned to normal or that the SRV is leaking. Block 309 may be left blank or N/Ad.

Cue: If the examinee determines that the tailpipe has not returned to normal or that the SRV is leaking, as the CRS instruct the examinee to leave the block blank if questioned and continue.

Comments The critical portion of this step is the determination that B21-F047A tailpipe temperature has not returned to normal value, not recording a data value.

SAT £ UNSAT £ Comment Number Page 9 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JPM Step 9 Fill in block 310 of CPS 3831.01D002, ACTUATION LOG.

Standard: No examinee action required - block is already filled in.

Cue:

Comments SAT £ UNSAT £ Comment Number JPM Step 10 Fill in block 311 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records 1013 in block 311.

Cue:

Comments SAT £ UNSAT £ Comment Number JPM Step 11 Fill in block 312 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records 1013 in block 312.

Cue: If the examinee requests the reseat pressure value, cue him/her that the valve reseated at the pressure indicated on the post test SPDS summary screen.

Comments SAT £ UNSAT £ Comment Number Page 10 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JPM Step 12 Fill in block 313 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records 1 minute 0 seconds in block 313.

Cue: If the examinee requests the duration time for the actuation of B21-F047A, cue him/her that B21-F047A was open for 1 minute 0 seconds.

Comments SAT £ UNSAT £ Comment Number JPM Step 13 Fill in block 314 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records A and/or E in block 314.

Cue:

Comments SAT £ UNSAT £ Comment Number JPM Step 14 Fill in block 315 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records N/A in block 315.

Cue: As the CRS, cue the examinee to record N/A in block 315.

Comments SAT £ UNSAT £ Comment Number Page 11 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JPM Step 15 If CPS 3831.01F001 Comment Sheet is completed for this log entry, indicate YES IN BLOCK 316. If not completed, indicate NO in block 316.

Standard: Examinee records Yes or No in block 316.

Cue:

Comments If the examinee records Yes in block 316, an entry in CPS 3831.01F001 Comment Sheet should be made.

SAT £ UNSAT £ Comment Number JPM Step 16 Examinee completes CPS 3831.01D002 Actuation Log.

Standard: Examinee records his/her signature and date in the Completed By blanks and provides the completed CPS 3831.01D002 Actuation Log to Shift Supervision for review.

Cue: Cue the examinee that the JPM is complete.

Comments SAT £ UNSAT £ Comment Number TERMINATING CUES:

The JPM is complete when the student has delivered CPS 3831.01F001 Comment Sheet to Shift Supervision for review.

STOP TIME:

Page 12 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Complete an SRV Actuation Report JPM Number: JPM407 Revision Number: 02 Task Number and

Title:

383101.01, Complete Control Room actions to document data on failures and actuation's of the Safety Relief Valves in the Main Steam System and to generate reports required by the Nuclear Regulatory Commission K/A System K/A Number Importance (RO/SRO)

Generic 2.1.18 3.6 3.8 Ability to make accurate, clear, and concise logs, records, status boards, and reports.

Suggested Testing Environment: Classroom Actual Testing Environment: £ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 18 minutes Actual Time Used: minutes

References:

  • CPS 9056.02, SAFETY/RELIEF VALVE ACTUATION TEST Rev. 29b
  • CPS 3831.01D002 ACTUATION LOG Rev. 6
  • CPS 3831.01F001 COMMENT SHEET Rev. 4 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 13 of 18

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the B RO on dayshift.

The unit is operating at 80% power.

CPS 9056.02 SAFETY/RELIEF VALVE ACTUATION TEST was performed on B21-F047A on the previous shift (midshift) during steady state operations.

During the test, B21-F047A was opened at 0027 for 1 minute 0 seconds.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

§ Do NOT shine any type light into a panel.

The CRS has provided you with the following data sheets:

  • SRV B21-F047A tailpipe temperature graph
  • Pre-test and Post-test screen shots of PPC screens 6D-04 (IRM/APRM indications), D05AD1 (SPDS Summary Display), and DD5BD3 (SPDS RPV, Pri-Cnmt, and Hydrogen Display)

The CRS has marked block 310 of CPS 3831.01D002 Actuation Log NA.

The CRS has directed you to complete CPS 3831.01 Safety Relief Valve Report for 1B21-F047A.

Page 14 of 18

Clinton Power Station Job Performance Measure (JPM)

Attachments B21-F047A Tailpipe Temperature Graph Page 15 of 18

Clinton Power Station Job Performance Measure (JPM)

Pre and Post Test Page 16 of 18

Clinton Power Station Job Performance Measure (JPM)

Pre and Post Test Page 17 of 18

Clinton Power Station Job Performance Measure (JPM)

Pre and Post Test Page 18 of 18

CLINTON POWER STATION Job Performance Measure Evaluate License Maintenance Requirements JPM Number: JPM484 Revision Number: 00 Date: 8/25/16 Developed By: T. Jennings 8/25/16 Instructor Date Validated By: Michael Antonelli 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: Tony Jennings 11/15/16 Training Department Date JPM484_R0 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure OP-AA-105-102 Rev: 11 Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 12

JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 8/25/16 New JPM.

Page 3 of 12

JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. No simulator setup is required for this JPM.

Page 4 of 12

JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • The examinee correctly documents shifts worked during the quarter on OP-AA-105-102 Attachment 1 Active License Tracking Log and determines that 2 additional 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> RO watches are needed to maintain his/her license active past 12/31/16.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE Rev. 11 EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Provide the examinee with a blank copy of OP-AA-105-102 Attachment 1 Active License Tracking Log.

Page 5 of 12

JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are a Reactor Operator with an active NRC license.

Today is 12/23/16.

You are currently assigned to relieve the A RO on 1/2/17.

During the current quarter (4th quarter of 2016) you worked a mixed shift schedule consisting of the following:

  • You stood three complete 12-hour day shift watches as the A RO on October 12th, 13th, and 14th.
  • You stood two 8-hour swing shift watches as the B RO on October 23rd and 24th.
  • You split 8-hour day shifts working 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> as the B RO and the remaining 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> as a clearance writer on October 1st, 2nd, 8th, 9th, 15th, 16th, 22nd, 27th, 29th, and 30th.
  • You split two 12-hour midnight shifts, working six hours as the A RO and the other six hours as a clearance writer during the outage on November 10th and 11th.
  • The remaining days in the 4th quarter of 2016 were spent as a clearance writer (Monday through Friday).
  • All shifts covered were entered in the Narrative log.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

§ Do NOT shine any type light into a panel.

You are to document your shift coverage for the 4th quarter of 2016 on OP-AA-105-102 Attachment 1 Active License Tracking Log, and determine your ability to assume shift for 1/2/17.

START TIME:

Page 6 of 12

JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE JPM Step 1 Record shift coverage from 4th quarter of 2016.

Standard: Examinee records the dates, shifts, length of shift, position filled, and signs attachment 1 using information from the initial conditions per the key (next page).

Cue:

Comments SAT £ UNSAT £ Comment Number Page 7 of 12

JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

KEY Attachment 1 Active License Tracking Log Page 1 of 1 Employee Number: ______________ 012345 (example)

SHIFT COVERAGE FOR THE _____(1 4th ST

, 2ND, 3RD, 4TH) CALENDAR QUARTER OF _____(YEAR) 2016 Examinees Name

_____________________ ACTIVE / INACTIVE Name of License Holder (Print) License Status At Start Quarter (Circle one)

RECORD OF 8 /12 HOUR SHIFTS WORKED DURING QUARTER Enter the date the shift ended, the shift, the shift length, the Unit, position covered, circle Y or N for logged in the SM log and signature. If working an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or 8 / 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift, enter a 1 for midnight shift, 2 for the day shift, or a 3 for the afternoon shift (only enter shifts at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> length for which turnovers were conducted). Seven shifts at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> in length are required per quarter. If working a straight 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift, enter a N for night shift or a D for day shift (only enter shifts at least 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in length for which turnovers were conducted). Five 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts are required per quarter. The quarterly shift watch requirement may be completed with a combination of complete 8 and 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts (in a position required by the plants Technical Specifications) at sites having a mixed shift schedule (enter appropriate shift designator), and watches shall not be truncated when the minimum quarterly requirement (56 hours6.481481e-4 days <br />0.0156 hours <br />9.259259e-5 weeks <br />2.1308e-5 months <br />) is satisfied. (NUREG 1021, Revision 9)

DATE SHIFT LENGTH UNIT POSITION SM LOG SIGNATURE OF (circle one) LICENSE HOLDER ONE Logged 10/12/16 D (or 2) 12 1 FHS SM US RO Y/N Examinee Signature TWO Logged 10/13/16 D (or 2) 12 1 FHS SM US RO Y/N Examinee Signature THREE 10/14/16 D (or 2) 12 1 FHS SM US RO Logged Examinee Signature Y/N FOUR Logged 10/23/16 3 8 1 FHS SM US RO Y/N Examinee Signature FIVE Logged 10/24/16 3 8 1 FHS SM US RO Y/N Examinee Signature SIX* Logged FHS SM US RO Y/N SEVEN* Logged FHS SM US RO Y/N

________________________/_____

Operations Support Manager Date KEY Page 8 of 12

JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

  • JPM Step 2 Reviews requirements to maintain an active license.

Standard: Examinee determines that he/she does NOT have the minimum number of hours required to maintain their license in an active status past 12/31/16.

Cue:

Comments SAT £ UNSAT £ Comment Number

  • JPM Step 3 Reviews requirements to maintain an active license.

Standard: Examinee determines that he/she is NOT eligible to stand watch on 1/2/17.

Cue: When the examinee has determined that they will not be eligible to assume the watch on 1/2/17, ask him/her what additional requirements they will need to be able to stand the watch on 1/2/17.

Comments SAT £ UNSAT £ Comment Number

  • JPM Step 4 Reviews requirements to maintain their license active past 12/31/16.

Standard: Examinee determines that a minimum of one more complete eight hour or twelve hour watch is needed to maintain their license active past 12/31/16.

Cue: When the student has completed OP-AA-105-102 Attachment 1 Active License Tracking Log and determined eligibility to stand watch on 1/2/17 state that the JPM is complete.

Comments SAT £ UNSAT £ Comment Number Page 9 of 12

JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

TERMINATING CUES:

The JPM is complete when the student has completed OP-AA-105-102 Attachment 1 Active License Tracking Log and determined eligibility to stand watch on 1/2/17.

STOP TIME:

Page 10 of 12

JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Evaluate License Maintenance Requirements JPM Number: JPM484 Revision Number: 00 Task Number and

Title:

LP85801.2.1.4 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, no solo operation, maintenance of active license status, 10CFR55, etc.

K/A System K/A Number Importance (RO/SRO)

Generic 2.1.4 3.3 3.8 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, no solo operation, maintenance of active license status, 10CFR55, etc.

Suggested Testing Environment: Classroom Actual Testing Environment: £ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 11 of 12

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are a Reactor Operator with an active NRC license.

Today is 12/23/16.

You are currently assigned to relieve the A RO on 1/2/17.

During the current quarter (4th quarter of 2016) you worked a mixed shift schedule consisting of the following:

  • You stood three complete 12-hour day shift watches as the A RO on October 12th, 13th, and 14th.
  • You stood two 8-hour swing shift watches as the B RO on October 23rd and 24th.
  • You split 8-hour day shifts working 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> as the B RO and the remaining 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> as a clearance writer on October 1st, 2nd, 8th, 9th, 15th, 16th, 22nd, 27th, 29th, and 30th.
  • You split two 12-hour midnight shifts, working six hours as the A RO and the other six hours as a clearance writer during the outage on November 10th and 11th.
  • The remaining days in the 4th quarter of 2016 were spent as a clearance writer (Monday through Friday).
  • All shifts covered were entered in the Narrative log.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

§ Do NOT shine any type light into a panel.

You are to document your shift coverage for the 4th quarter of 2016 on OP-AA-105-102 Attachment 1 Active License Tracking Log, and determine your ability to assume shift for 1/2/17.

Page 12 of 12

CLINTON POWER STATION Job Performance Measure Print Reading - Determine Isolation Boundaries and Depressurize 1B21-F022A Accumulator JPM Number: JPM526 Revision Number: 01 Date: 8/26/16 Developed By: T. Jennings 8/26/16 Instructor Date Validated By: Michael Antonelli 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM526_1 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 11

JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 6/16/14 New JPM.

01 8/26/16 Corrected typographical error on page 5 and added revision numbers to the procedure references used for the JPM.

Page 3 of 11

JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. This is a RO Admin JPM and requires no simulator setup.

Page 4 of 11

JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • The examinee determines isolation boundaries and depressurizes 1B21A001A Inboard MSIV 1B21-F022A accumulator using station mechanical drawings.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • M10-9002-5 Rev. D
  • M05-1040-14 Rev. AB EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Administer this JPM in a location with access to station drawings and a computer (if requested).

Page 5 of 11

JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The station is in a refueling outage.

All Inboard and Outboard Main Steam Line Isolation Valve hand switches are in the CLOSED position.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

You are an extra RO.

The CRS has requested that you determine which valves are required to:

1) isolate air to accumulator 1B21-A001A (1B21-F022A Inbd MSIV Air Accumulator), and
2) depressurize accumulator 1B21-A001A Report to the CRS after completing the task.

START TIME:

Page 6 of 11

JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS M10-9002-5

Standard: The examinee can determine the correct print by using one of the following methods:

  • Passport equipment search
  • ESOMs equipment database
  • M05-1000 P&ID Index Cue:

Comments SAT £ UNSAT £ Comment Number

Standard: Examinee determines that V3 is the accumulator drain and uses the table at the top of M10-9002-5 to determine that V3 for 1B21-A001A is 1B21-F083A.

Cue:

Comments Steps 2 - 4 can be performed in any order.

SAT £ UNSAT £ Comment Number Page 7 of 11

JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM) 3 Determines that opening V2 (1IA092A) will depressurize the air supply header upstream of accumulator 1B21-A001A.

Standard: Examinee determines that V2 is a drain that taps off of the IA supply line to 1B21-A001A upstream of check valve 1B21-F024A and determines that opening the valve will depressurize the IA supply line (but not the accumulator).

Cue:

Comments This is an optional step added in the event that the examinee determines that opening 1IA092A is appropriate in depressurizing the IA supply header upstream of check valve 1B21-F024A.

It is NOT a competency hit if the examinee includes or excludes 1IA092A in his/her answer. It would be a failure of a critical step, however, if the examinee determines that solely opening 1IA092A will depressurize accumulator 1B21-A001A and does not include 1B21-F083A in his/her answer.

SAT £ UNSAT £ Comment Number

Standard: Examinee determines that the IA supply line to accumulator 1B21-A001A is located on M05-1040 Sheet 14, and then determines that 1IA077A is the isolation valve for line 1IA80AA 1/2.

Cue:

Comments Steps 2 - 4 can be performed in any order.

SAT £ UNSAT £ Comment Number Page 8 of 11

JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM) 3 Determines that closing 1IA078A will depressurize the actuator air supply header for 1B21-F022A.

Standard: Examinee determines that 1IA078A is the actuator air supply isolation valve supplying air to the actuator solenoids for 1B21-F022A.

Cue:

Comments This is an optional step added in the event that the examinee determines that closing 1IA078A is needed to isolate all air sources from 1B21-A001A.

With the MSIV control switch in the CLOSE position (provided in the initiating cue), actuator air via 1IA078A is isolated from 1B21-A001A by the A and B operating solenoids. It is NOT a competency hit if the examinee includes or excludes 1IA078A in his/her answer. It would be a failure of a critical step however, if the examinee determines that solely closing 1IA078A will isolate air to accumulator 1B21-A001A and does not include 1IA077A in his/her answer.

SAT £ UNSAT £ Comment Number TERMINATING CUES:

The examinee has identified the IA isolation and drain valve for accumulator 1B21A001A using station mechanical drawings.

STOP TIME:

Page 9 of 11

JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Print Reading - Determine Isolation Boundaries and Depressurize 1B21-F022A Accumulator JPM Number: JPM526 Revision Number: 00 Task Number and

Title:

0.13L Read Mechanical and Electrical Prints K/A System K/A Number Importance (RO/SRO)

NA 2.2.41 3.5 3.9 Suggested Testing Environment: Simulator or Classroom Actual Testing Environment: ¢ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

M10-9002-5, M05-1040-14 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 11

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The station is in a refueling outage.

All Inboard and Outboard Main Steam Line Isolation Valve hand switches are in the CLOSED position.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

You are an extra RO.

The CRS has requested that you determine which valves are required to:

1) isolate air to accumulator 1B21-A001A (1B21-F022A Inbd MSIV Air Accumulator), and
2) depressurize accumulator 1B21-A001A Report to the CRS after completing the task.

Page 11 of 11

CLINTON POWER STATION Job Performance Measure Use CPS RP On-Line To Determine Radiological Requirements JPM Number: JPM532 Revision Number: 01 Date: 8/29/16 Developed By: T. Jennings 8/29/16 Instructor Date Validated By: Michael Antonelli 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date Retain approved Master Copy per SRRS 3D.126/3D.111 JPM532_R1 Facility Approved.doc

JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure RP-AA-210 Rev: 26 Procedure RP-AA-376 Rev: 9 Procedure RP-AA-403 Rev: 8 Procedure RP-AA-460 Rev: 28

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 14

JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 10/7/14 New JPM.

01 8/29/16 Updated procedure revisions and made editorial changes throughout.

Page 3 of 14

JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. There are no simulator setup instructions for this JPM.

Page 4 of 14

JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Given a specific location in a Radiological Controlled Area (RCA), demonstrate the ability to obtain survey data and determine highest dose rate.
  • Given a Radiological Work Permit (RWP), determine the RWP requirements for entering a specific location in an RCA.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • RP-AA-210, Rev. 26 DOSIMETRY ISSUE, USAGE, AND CONTROL
  • RP-AA-376, REV. 9 RADIOLOGICAL POSTINGS, LABELING, AND MARKINGS
  • RP-AA-403, Rev. 8 ADMINISTRATION OF THE RADIATION WORK PERMIT PROGRAM
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • This JPM can be performed in a classroom or other suitable setting that has access to a computer with LAN access. CPS RP On-Line Main Screen will be displayed.
  • This JPM contains 2 attachments (RWP and Survey Map) in addition to the Initial Conditions and Initiating Cue page (last) page of the JPM. Do NOT provide the examinee with these attachments until prompted to do so.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.

Page 5 of 14

JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

It is 12/3/16.

The plant is operating at rated thermal power.

Annunciator 5130-6E O.G. Analyzer A Trouble Chk Status Lights has just been received on the A OG Hydrogen Analyzer at 1H13-P845 Off Gas Control Panel.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

Retrieve and review the latest periodic survey data for the A OG Hydrogen Analyzer using CPS RP On-Line in preparation for entering the A OG Hydrogen Analyzer room to investigate the trouble alarm.

Determine requirements for entry and dose levels.

START TIME:

Page 6 of 14

JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS RP-AA-403 Administration of the Radiation Work Permit Program RP-AA-460 Controls for High and Locked High Radiation Areas RP-AA-1008 Unescorted Access To And Conduct In Radiologically Controlled Areas

  • 1 Examinee retrieves the latest periodic survey data for the A OG Hydrogen Analyzer using the CPS RP On-Line computer program.

Standard: Examinee clicks on the box labeled Turbine Building.

Examinee clicks on the box labeled 800.

Examinee clicks the link for the latest periodic Pre-Treatment A/E PRM survey (in the Survey column).

Cue: 1. When the examinee has retrieved the survey sheet in CPS RP On-Line, provide the examinee with Attachment 2 - Survey Map and then close the CPS RP On-Line program.

2. Ask the examinee to determine the highest dose rate in the walking path to the OG Hydrogen Analyzers.

Comments When the examinee clicks the link for the latest Pre-Treatment A/E PRM survey, a PDF document of the survey sheet for the room will open.

SAT £ UNSAT £ Comment Number Page 7 of 14

JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)

  • 2 Examinee determines the highest dose rate in the walking path to the A OG Hydrogen Analyzer Room.

Standard: Identifies the intended location on the map and determines the highest dose rate in the walking path to the A OG Hydrogen Analyzer is 2.2 mr/hr.

Cue: Ask the examinee to identify the location of the highest dose rate in the TB 805 EL. Pre-Treatment A/E PRM Room.

Comments The contamination levels in the room are all less than 1,000 dpm/100cm2; no contaminated area posting is required.

SAT £ UNSAT £ Comment Number

  • 3 Examinee determines the location of the area containing the highest dose rate in the TB 805 EL. Pre-Treatment A/E PRM Room.

Standard: Examinee reviews the survey map and determines the highest dose rate is on a component in the HRA area by the A/E PRM (annotated by *1500/260).

Cue: Ask the examinee to identify the RWP requirements for entering the area with the highest dose rate.

Comments SAT £ UNSAT £ Comment Number Page 8 of 14

JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)

  • 4 Examinee determines the RWP requirements for entering the HRA area.

Standard: Examinee determines that entry into the HRA area requires a specific HRA briefing.

Cue: JPM is complete.

Comments SAT £ UNSAT £ Comment Number TERMINATING CUES:

The examinee has demonstrated the proper method to enter a specific location in a Radiological Controlled Area (RCA).

STOP TIME:

Page 9 of 14

FOR TRAINING USE ONLY Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Use CPS RP On-Line To Determine Radiological Requirements JPM Number: JPM532 Revision Number: 00 Task Number and

Title:

102405.01 Apply the administrative requirements of ALARA program K/A System K/A Number Importance (RO/SRO)

Generic 2.3.7 3.5 3.6 Ability to comply with radiation work permit requirements during normal or abnormal conditions.

Suggested Testing Environment: Classroom/Simulator Actual Testing Environment: £ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

  • RP-AA-210, Rev. 26 Dosimetry Issue, Usage, and Control
  • RP-AA-376, Rev. 9 Radiological Postings, Labeling, and Markings
  • RP-AA-403, Rev. 8 Administration of the Radiation Work Permit Program

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 10 of 14

FOR TRAINING USE ONLY Attachment 1 - Radiation Work Permit (RWP)

Clinton Power Station Radiation Work Permit RWP#: 10010001 Rev: 0 Worker Information RWP

Description:

2016 Operations Department Generic Unit: Building: Elevation: Location:

1 All All Various Equipment: Various RWP Dose Approval: 25 mrem ED Dose Alarm: 20 mrem Dose Rate Alarm: 200 mrem/hr Exposure Monitoring Requirements Respiratory Protection Required DLR and Electronic Dosimeter Radiation Protection shall evaluate for engineering control and respiratory protection per RP-AA-401.

Teledosimetry may be used in lieu of standard ED.

ED setpoints may be raised IAW RP-AA-403 based upon current survey data in the work location.

Special Instructions Protective Clothing Requirements This RWP allows High Radiation Area access: A specific Protective Clothing ( 100,000 dpm/100 cm2)

HRA briefing is required to enter.

Coveralls, Hardhat cover, cotton liners, 1 pair rubber No LHRA access permitted on this RWP. gloves, rubber shoe covers and booties Electronic Dosimeters should be checked at approximately 15 minute intervals or more often in higher radiation areas. Protective Clothing (< 10,000 dpm/100 cm2)

RP APPROVAL REQUIRED Radiation Worker Pocket Data Sheet Trip Ticket will be used by each individual for each entry. Modesty garments, rubber shoe covers and booties, cotton liners, 1 pair rubber gloves Verify with RP that your work area has been surveyed AND that the ED dose rate alarm and dose alarm setpoints are Company modesty garments shall be worn under PCs.

adequate. If dose rates and/or contamination levels and/or dosimetry placement (when applicable) are not known for current plant status, an RPT may survey the area prior to start of work.

Contact RP prior to accessing areas above 7 ft.

NO work to be done in pools of water on this RWP, ie 755 Fuel/828&737 CT and suppression pool.

Stop Work Limits:

1. GA dose rates =/> 200 mr/hr
2. GA contamination levels =/> 100K dpm/100cm2
3. Airborne radioactivity =/> 0.3 DAC Page 11 of 14

FOR TRAINING USE ONLY Attachment 1 (contd) - Radiation Work Permit (RWP)

Clinton Power Station Radiation Work Permit RWP#: 10010001 Rev: 0 Radiation Protection Information Survey Frequency Requirements: Shielding Recommended:

Radiation : R None Contamination: R Temporary Airborne: R Permanent Pre-Job Briefing Notes:

RPT Coverage / Comments:

Initial Intermittent Continuous RP Supervisor ALARA Review By Prepared By Terminated By J. Smith 1/1/2015 Job Supervisor Page 12 of 14

FOR TRAINING USE ONLY Attachment 2 - Survey Map Page 13 of 14

INITIAL CONDITIONS:

It is 12/3/16.

The plant is operating at rated thermal power.

Annunciator 5130-6E O.G. Analyzer A Trouble Chk Status Lights has just been received on the A OG Hydrogen Analyzer at 1H13-P845 Off Gas Control Panel.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

Retrieve and review the latest survey data for the A OG Hydrogen Analyzer using CPS RP On-Line in preparation for entering the A OG Hydrogen Analyzer room to investigate the trouble alarm.

Determine requirements for entry and dose levels.

Page 14 of 14

CLINTON POWER STATION Job Performance Measure Review Surveillance 9820.01 Power Distribution Limits JPM Number: JPM425 Revision Number: 02 Date: 8/23/16 Developed By: T. Jennings 8/23/16 Instructor Date Validated By: Matt Baker 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM425_R02 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 9820.01 Rev: 34 Procedure CPS 9820.01D001 Rev: 32e Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 11

JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 7/26/10 New JPM number and updated revisions (10110001SAF01) 01 06/14/13 Converted to new template 02 8/23/16 Updated procedure references.

Page 3 of 11

JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. This JPM can be performed in a classroom or other secure area with the 3D cases generated per step 2.
2. The following can be used as necessary to recreate the 3D Case printouts with out of spec MFLCPR and MFLPD:
a. Initialize to a full power IC.
b. Insert Malfunction M3D_FLCPR_V_10 to a final value of 1.012 to raise MFLCPR for fuel assembly 21-18 to a value greater than 1.0.
c. Insert Malfunction M3D_FLPD_V_2 to a final value of 1.083 to raise MFLPD for fuel assembly 23-32 to a value greater than 1.0.
d. Print out a 3D case.
e. Verify MFLCPR and MFLPD are > 1.0.
3. Freeze Simulator.
4. Markup a copy of 9820.01D001 Power Distribution Limits Data Sheet to match the attached example.
5. Attach the 3D Monicore Case to the copy of 9820.01D001.

Page 4 of 11

JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • The CRS review finds the two mistakes on the datasheet showing all thermal limits are in specification which is in conflict with the 3D Monicore Case showing a bundle with a MFLCPR and MFLPD of greater than one.
  • CPS No. 9820.01 Power Distribution Limits, Revision 34.
  • CPS No. 9820.01D001 Power Distribution Limits Data Sheet, Revision 32e.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 9820.01 Power Distribution Limits, Revision 34.
  • CPS No. 9820.01D001 Power Distribution Limits Data Sheet, Revision 32e.
  • Amplifying cues are provided within the JPM steps.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • When the initiating cue is read, provide the student with the marked up copy of 9820.01D001 with the attached 3D Monicore Printout.
  • All pre-job briefings are completed.

Page 5 of 11

JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The unit is at full power. A rod shuffle was completed one hour ago. The B RO has just completed 9820.01 Power Distribution Limits surveillance.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

§ Do NOT shine any type light into a panel.

1. You are the CRS. Review the completed surveillance data sheet, CPS No. 9820.01D001, Power Distribution Limits Data Sheet.
2. Take any required actions.

The evaluator will act as all other crew members.

START TIME:

Page 6 of 11

JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS 9820.01D001 Power Distribution Limits Data Sheet

  • JPM Step 1 The examinee reviews the completed datasheet and notes that step 8.3 was 8.3 incorrectly marked indicating MFLCPR was less than 0.98 when the 3D Monicore case shows a bundle with MFLCPR is greater than 1.00.

Standard: CRS determines that the data sheet was not correctly filled out and MFLCPR is out of specification.

Cue:

Comments SAT £ UNSAT £ Comment Number 9820.01D001 Power Distribution Limits Data Sheet

  • JPM Step 2 The examinee reviews the completed datasheet and notes that step 8.4 was 8.4 incorrectly marked indicating MFLPD was less than 0.98 when the 3D Monicore case shows a bundle with MFLPD is greater than 1.00.

Standard: CRS determines that the data sheet was not correctly filled out and MFLPD is out of specification.

Cue:

Comments SAT £ UNSAT £ Comment Number Page 7 of 11

JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

  • JPM Step 3 Technical Specifications - Minimum Critical Power Ratio (MCPR)

3.2.2 Standard

The examinee reviews Technical Specifications and enters Action 3.2.2 A.1 -

Restore MCPR to within limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Cue:

Comments SAT £ UNSAT £ Comment Number

  • JPM Step 4 Technical Specifications - Linear Heat Generation Rate (LHGR)

3.2.3 Standard

The examinee reviews Technical Specifications and enters Action 3.2.3 A.1 -

Restore LHGR to within limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Cue:

Comments SAT £ UNSAT £ Comment Number Page 8 of 11

JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JPM Step 5 Examinee contacts RE for instructions to restore MFLCPR and MFLPD to within limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Standard: Examinee contacts the RE for instructions.

Cue: If the examinee consults with the RE, tell him/her that the REs are determining an appropriate course of action to restore MFLCPR and MFLPD to within limits.

Comments If the examinee requires a new 3D case, cue him/her that values are identical to the case used for the surveillance.

SAT £ UNSAT £ Comment Number JPM Step 6 Examinee notifies the Shift Manager that MFLCPR and MFLPD are outside Technical Specification Limits.

Standard: Examinee notifies the Shift Manager that the ITS limits for MCPR and LHGR have been exceeded and that ITS LCO 3.2.2 A.1 and 3.2.3 A.1 have been entered.

Cue: Acknowledge report from the examinee.

Comments SAT £ UNSAT £ Comment Number TERMINATING CUES:

The JPM is complete when the student has determined that the MFLCPR and MFLPD limit has been exceeded and determines the appropriate Technical Specification actions that are required.

STOP TIME:

Page 9 of 11

JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Review Surveillance 9820.01 Power Distribution Limits JPM Number: JPM425 Revision Number: 01 Task Number and

Title:

(101100.01) Apply the administrative requirements of SURVEILLANCE TESTING PROGRAM K/A System K/A Number Importance (RO/SRO)

Generic 2.1.7 N/A 4.7 Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.

Suggested Testing Environment: Simulator Actual Testing Environment: £ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: ¢ Yes £ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

CPS No. 9820.01 Power Distribution Limits, Revision 34.

CPS No. 9820.01D001 Power Distribution Limits Data Sheet, Revision 32e.

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 11

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The unit is at full power. A rod shuffle was completed one hour ago. The B RO has just completed 9820.01 Power Distribution Limits surveillance.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

§ Do NOT shine any type light into a panel.

1. You are the CRS. Review the completed surveillance data sheet, CPS No. 9820.01D001, Power Distribution Limits Data Sheet.
2. Take any required actions.

The evaluator will act as all other crew members.

Page 11 of 11

CLINTON POWER STATION Job Performance Measure Evaluation of Work Hours IAW 10CFR26 JPM Number: JPM483 Revision Number: 00 Date: 8/24/16 Developed By: T. Jennings 8/24/16 Instructor Date Validated By: Matt Baker 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM483_R0 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure LS-AA-119________ Rev: 12 Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 9

JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 8/24/16 New JPM.

Page 3 of 9

JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Examinee determines that LS-AA-119 work hour limits will be exceeded and reports findings to the Shift Manager.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • LS-AA-119 Rev. 12 Fatigue Management and Work Hour Limits EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Provide the examinee with the following items when requested:

o LS-AA-119 Fatigue Management and Work Hour Limits Page 4 of 9

JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The plant is in Mode 1.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

You are a Shift Supervisor on an operating crew.

Review the proposed work schedule for the upcoming six weeks and determine if the requirements of LS-AA-119 Fatigue Management and Work Hour Limits will be met if implemented as written and report results to the Shift Manager.

SUN MON TUE WED THU FRI SAT Week 1 X D D D X X X Week 2 X X X D D D D Week 3 D R D X X N N Week 4 N N X R R R X Week 5 X X N N N X X Week 6 X T T T T T N X = Day Off D = 12 Hour Day N = 12 Hour Night (Starts at 1900 on previous day)

R = 8 Hour Relief Shift T = 8 Hour Training Day START TIME:

Page 5 of 9

JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS LS-AA-119 Fatigue Management and Work Hour Limits Comment SAT UNSAT STEP ELEMENT STANDARD Number Determines 10 CFR 26 Work Locates and reviews LS-AA-119 section 1

Hour Limits. 5.1.1 10CFR26 Work Hour Limits.

2 Reviews Week 1 of the proposed 5.1.1 schedule. Determines that the scheduled hours will not violate 10CFR26 work hour limits.

3 Reviews Week 2 of the proposed 5.1.1 schedule. Determines that the scheduled hours will not violate 10CFR26 work hour limits.

4 Reviews Week 3 of the proposed *5.1.1 schedule. Determines that the scheduled 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> from Week 2 Wednesday to Week 3 on Tuesday will violate 10CFR26 work hour limit of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in a 7-day period.

Evaluator Cue - When reported, acknowledge the report and cue the examinee to complete the schedule review.

5 Reviews Week 4 of the proposed 5.1.1 schedule. Determines that the scheduled hours will not violate 10CFR26 work hour limits.

6 Reviews Week 5 of the proposed 5.1.1 schedule. Determines that the scheduled hours will not violate 10CFR26 work hour limits.

Page 6 of 9

JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number 7 Reviews Week 6 of the proposed *5.1.1 schedule. Determines that the scheduled hours will violate the following 10CFR26 work hour limits:

  • 16 in 24 (0700 on Friday until 0700 on Saturday = 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> in a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period), or
  • 26 in 48 (0700 on Thursday until 0700 on Saturday = 28 hours3.240741e-4 days <br />0.00778 hours <br />4.62963e-5 weeks <br />1.0654e-5 months <br /> in a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period), or
  • 10 hour1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> break between successive work periods (the transition from training on Friday to night shift on Saturday is 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />)

Evaluator Note - the 10 hour1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> break requirement drives the violation of the 16 in 24 and 26 in 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> requirements, so stating a violation of any one of the three limits above constitutes satisfactory performance of the step.

Evaluator Cue - When reported, acknowledge the report and cue the examinee that the JPM is complete.

TERMINATING CUES:

Candidate completes review of the proposed work schedule and reports identified issues to the Shift Manager.

STOP TIME:

Page 7 of 9

JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Evaluation of Work Hours IAW 10CFR26 JPM Number: JPM483 Revision Number: 00 Task Number and

Title:

999999.25 Prepare a Minimum Shift Complement Form K/A System K/A Number Importance (RO/SRO)

Generic 2.1.5 3.9 Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.

Suggested Testing Environment: Classroom Actual Testing Environment: £ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: ¢ Yes £ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

LS-AA-119, Rev. 12, Fatigue Management and Work Hour Limits EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 9

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The plant is in Mode 1.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

You are a Shift Supervisor on an operating crew.

Review the proposed work schedule for the upcoming six weeks and determine if the requirements of LS-AA-119 Fatigue Management and Work Hour Limits will be met if implemented as written and report results to the Shift Manager.

SUN MON TUE WED THU FRI SAT Week 1 X D D D X X X Week 2 X X X D D D D Week 3 D R D X X N N Week 4 N N X R R R X Week 5 X X N N N X X Week 6 X T T T T T N X = Day Off D = 12 Hour Day N = 12 Hour Night (Starts at 1900 on previous day)

R = 8 Hour Relief Shift T = 8 Hour Training Day Page 9 of 9

CLINTON POWER STATION Job Performance Measure Tech Spec Call / Clearance Approval JPM Number: JPM469 Revision Number: 01 Date: 7/8/16 Developed By: T. Jennings 7/8/16 Instructor Date Validated By: Brian Glynn 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM469_R1 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure OP-AA-109-101 Rev: 12 Procedure CPS 3309.01E001 Rev: 8 Procedure CPS 3309.01V001 Rev: 11b Procedure M05-1074 SH001 Rev: AH Procedure E02-1HP99 SH110 Rev: H Procedure E02-1HP99 SH505 Rev: N

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 10

JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 6/15/15 New JPM.

01 7/8/16 Updated procedure references.

Page 3 of 10

JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Candidate reviews the Technical Specifications and determines the correct Technical Specification Action requirement(s).
  • Candidate reviews the Clearance Order Checklist and determines:

o that compartment/circuit breaker AB MCC 1C COMPT 2C (1E22-S002/2C) for HPCS Water Leg Pump 1E22-C003 must be added to the Clearance Order Checklist.

o that EIN 1E22F356 is incorrect for the HPCS WTR LEG PUMP TEST LINE ISOL and that the correct EIN for the HPCS WTR LEG PUMP TEST LINE ISOL is 1E22F351.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • E02-1HP99 Sheet 110, Rev H HPCS Power Supply System
  • E02-1HP99 Sheet 505, Rev N HPCS WATER LEG PUMP (1E22-C003) AND (DIV 3)

EVALUATOR INSTRUCTIONS:

  • Amplifying cues are provided within the JPM steps.
  • After providing the initiating cue, provide the examinee with a copy of:

o Clearance Order Checklist o OP-AA-109-101, Rev 12 CLEARANCE AND TAGGING

  • Allow candidate access to the remaining PROCEDURAL/REFERENCES listed above.

Page 4 of 10

JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

  • The plant is operating at rated power.
  • A Clearance Order Checklist has been prepared to isolate the HPCS Water Leg Pump leak and facilitate repairs.

INITIATING CUE:

As CRS you are tasked to:

  • Provide an independent Tech Spec call based on the conditions above.
  • Review the prepared Clearance Order Checklist for approval (Passport is NOT available).

START TIME:

Page 5 of 10

JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS Technical Specifications

  • 1. The candidate reviews the Technical Specifications and determines the correct Technical Specification Action requirement.

Standard: Determines the required action is TS 3.5.1 Action B.1 and B.2.

Cue:

Comments SAT £ UNSAT £ Comment Number Page 6 of 10

JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Clearance Order Checklist OP-AA-109-101, Rev 12 Clearance And Tagging HPCS Water Leg Pump Drawing (E02-1HP99 Sheet 505) or equivalent

  • 2. The candidate reviews the Clearance Order Checklist and determines that the electrical isolation of the HPCS Water Leg Pump is incomplete. The HPCS Water Leg Pump Breaker must be added to the Clearance Order Checklist.

Standard: Determines that compartment/circuit breaker AB MCC 1C COMPT 2C (1E22-S002/2C) for HPCS Water Leg Pump 1E22-C003 must be added to the Clearance Order Checklist.

Cue: None Comments SAT £ UNSAT £ Comment Number Clearance Order Checklist High Pressure Core Spray (HP) Drawing (M05-1074 Sheet 001)

  • 3. The candidate reviews the Clearance Order Checklist and determines that the Equipment Identification Number (EIN) listed for the HPCS WTR LEG PUMP TEST LINE ISOL is incorrect.

Standard: Determines that EIN 1E22F356 is incorrect for the HPCS WTR LEG PUMP TEST LINE ISOL and that the correct EIN for the HPCS WTR LEG PUMP TEST LINE ISOL is 1E22F351.

Cue: None Comments SAT £ UNSAT £ Comment Number Page 7 of 10

JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)

4. Task Completion Standard: Review is complete.

Cue: JPM is complete.

Comments SAT £ UNSAT £ Comment Number STOP TIME:

Page 8 of 10

JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Tech Spec Call / Clearance Approval JPM Number: JPM469 Revision Number: 00 Task Number and

Title:

140109.23 Apply the administrative requirements for Execution of Technical Specifications or Off-Site Dose Calculation Manual Requirements.

K/A System K/A Number Importance (RO/SRO)

Generic 2.2.40 3.4 4.7 Suggested Testing Environment: Simulator Actual Testing Environment: £ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: ¢ Yes £ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 25 minutes Actual Time Used: minutes

References:

See page 4 of 10.

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 10

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

  • The plant is operated at rated power.
  • A Clearance Order Checklist has been prepared to isolate the HPCS Water Leg Pump leak and facilitate repairs.

INITIATING CUE:

As CRS you are tasked to:

  • Provide an independent Tech Spec call based on the conditions above.
  • Review the prepared Clearance Order Checklist for approval (Passport is NOT available).

Page 10 of 10

CLINTON POWER STATION Job Performance Measure Review CPS 9038.70 Radiation Monitoring Source Check Surveillance JPM Number: JPM536 Revision Number: 01 Date: 8/23/16 Developed By: T. Jennings 8/23/16 Instructor Date Validated By: Brian Glynn 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date Retain approved Master Copy per SRRS 3D.126/3D.111 JPM536_R1 Facility Approved.doc

JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CY-CL-170-301 Rev: 25 Procedure CPS 9038.70 Rev: 3e Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 12

JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 10/9/14 New JPM.

01 8/23/16 Updated procedure references.

Page 3 of 12

JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. No simulator setup is required for this JPM.
2. This JPM should be conducted in a location that provides easy access to the required reference procedures (simulator, library, SM office, etc.).
3. The following procedures are required to be available should the candidate request them:
a. CY-CL-170-301 Offsite Dose Calculation Manual - Clinton Power Station Page 4 of 12

JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

25

  • CPS 9038.70 Radiation Monitoring Source Check Surveillance Rev. 3e EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

Page 5 of 12

JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The plant is operating at 97% power.

NO LCOs are in effect.

1RIX-PR041 Off Gas Post-Treatment Monitor is currently NON-FUNCTIONAL for maintenance.

The OG Vault Refrigeration (VO) System has been shut down for repairs. The repairs have just been completed, and the VO system is being prepared for startup. The OG Charcoal Beds are in BYPASS to support VO system startup IAW CPS 3407.01 Off-Gas Vault Refrigeration (VO) step 4.1.

CPS 9038.70 Radiation Monitoring Source Check Surveillance has just been completed for the gaseous radiation monitors, OG Pre-treatment process radiation monitor, and the OG Post-Treatment process radiation monitors.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

As an on-shift SRO, perform the supervisory review of CPS 9038.70 Radiation Monitoring Source Check Surveillance.

START TIME:

Page 6 of 12

JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CY-CL-170-301 Clinton Power Station Unit 1 Offsite Dose Calculation Manual 1 Examinee reviews section 5.0 Prerequisites of CPS 9038.70 Radiation Monitoring Source Check Surveillance.

Standard: Examinee reviews section 5.0 and determines section is filled out correctly.

Cue: Provide the examinee with the completed copy of CPS 9038.70 and attached data sheets for this step.

Comments SAT £ UNSAT £ Comment Number Page 7 of 12

JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)

  • 2 Examinee evaluates surveillance data for 1RIX-PR034 Off-Gas Pre-treatment PRM.

Standard: Examinee reviews surveillance data for 1RIX-PR034 and determines the following:

  • Monitor failed to reach the required value of 1.5 times the current cpm value during the surveillance.
  • The following ODCM 3.2.1 Required Actions must be taken:

o A.1, C.1, C.2.1.1, and C.2.1.2, OR o A.1, C.1, C.2.2.1, C2.2.2, and C2.2.3 (requires that the OG Charcoal Beds must immediately be placed in service)

Cue: If the examinee reports the failure, acknowledge the report and direct the examinee to complete the task.

If the examinee attempts to check the calculations on the data sheets, inform the examinee that the calculations have already been verified and to assume the calculations are correct.

Comments The examinee may perform review steps in any order.

Per the initiating cue, the OG Charcoal Beds are bypassed to support startup of the OG Vault Refrigeration System.

SAT £ UNSAT £ Comment Number Page 8 of 12

JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)

  • 3 Examinee evaluates surveillance data for 1RIX-PR035 Off-gas Post-treatment PRM
  1. 1.

Standard: Examinee reviews surveillance data for 1RIX-PR035 and determines the following:

  • Monitor failed to reach 30 cpm and 1.5 times the current cpm value when the source check was performed.
  • With 1RIX-PR041 already NON-FUNCTIONAL for maintenance, the following ODCM Required Actions must be taken:

o A.1, D.1, and D.2.1, OR o A.1, D.1, D.2.2.1, and D.2.2.2 Cue: If the examinee reports the failure, acknowledge the report and direct the examinee to complete the task.

If the examinee attempts to check the calculations on the data sheets, inform the examinee that the calculations have already been verified and to assume the calculations are correct.

Comments The examinee may perform review steps in any order.

SAT £ UNSAT £ Comment Number Page 9 of 12

JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM) 4 Examinee evaluates surveillance data for the remainder of the Gaseous Monitors in the surveillance.

Standard: Examinee reviews surveillance data for each of the remaining gaseous radiation monitors and determines the following:

  • Each monitor passed channel functional testing with the exception of 0RIX-PR002 HVAC Exhaust PRM #2 Iodine channel.
  • 0RIX-PR002 HVAC Exhaust PRM #2 Iodine Sampler is required to be FUNCTIONAL at all times, and that the non-ODCM failure does not impact functionality.

Cue: If the examinee reports the failure, acknowledge the report and direct the examinee to complete the task.

If asked, 0RIX-PR001 is in service.

If the examinee attempts to check the calculations on the data sheets, inform the examinee that the calculations have already been verified and to assume the calculations are correct.

Comments The examinee may perform review steps in any order.

SAT £ UNSAT £ Comment Number TERMINATING CUES:

CPS 9038.70 Radiation Monitoring Source Check Surveillance has been reviewed and ODCM impact has been evaluated and appropriate actions taken.

STOP TIME:

Page 10 of 12

JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO ¢ SRO £ STA £ SRO Cert JPM

Title:

Review CPS 9038.70 Radiation Monitoring Source Check Surveillance JPM Number: JPM536 Revision Number: 00 Task Number and

Title:

999999.19 Review the results of Surveillance Tests.

K/A System K/A Number Importance (RO/SRO)

Generic 2.3.15 NA 3.1 Knowledge of radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.

Suggested Testing Environment: Classroom or Simulator Actual Testing Environment: £ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: ¢ Yes £ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

Rev. 25

  • CPS 9038.70 Radiation Monitoring Source Check Surveillance Rev. 3e EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 11 of 12

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The plant is operating at 97% power.

NO LCOs are in effect.

1RIX-PR041 Off Gas Post-Treatment Monitor is currently NON-FUNCTIONAL for maintenance.

The OG Vault Refrigeration (VO) System has been shut down for repairs. The repairs have just been completed, and the VO system is being prepared for startup. The OG Charcoal Beds are in BYPASS to support VO system startup IAW CPS 3407.01 Off-Gas Vault Refrigeration (VO) step 4.1.

CPS 9038.70 Radiation Monitoring Source Check Surveillance has just been completed for the gaseous radiation monitors, OG Pre-treatment process radiation monitor, and the OG Post-Treatment process radiation monitors.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

As an on-shift SRO, perform the supervisory review of CPS 9038.70 Radiation Monitoring Source Check Surveillance.

Page 12 of 12

CLINTON POWER STATION Job Performance Measure Determine Protective Action Recommendations JPM Number: JPM482 Revision Number: 00 Date: 08/24/16 Developed By: T. Jennings 8/24/16 Instructor Date Validated By: Matt Baker 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM482_R0 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure EP-AA-111 Rev: 19 Procedure EP-AA-1003 Addendum 3 Rev: 1 Procedure EP-AA-111-F-07 Rev: G Procedure EP-AA-112-100-F-01 Rev: V

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 11

JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 8/24/16 New JPM Page 3 of 11

JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Examinee classifies the event, and determines appropriate PARs (evacuate Sub Area 1) within the required time frame.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • EP-AA-111, Emergency Classification and Protective Action Recommendations, Rev 19
  • EP-AA-1003 Addendum 3, Emergency Action Levels For Clinton Station, Rev 1
  • EP-AA-111-F-07, Clinton PAR Flowchart, Rev G
  • EP-AA-112-100-F-01 Shift Emergency Director Checklist, Rev. V EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Provide the examinee with the following items when requested:

o Shift Emergency Director Binder o EP-AA-1003, Addendum 3 EALs o EP-AA-1003, Addendum 3 Bases Page 4 of 11

JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the Shift Manager.

The plant was operating at rated thermal power when a transient occurred.

Plant conditions are as follows:

  • Reactor Water level is -177 inches and lowering with no injection sources available.
  • Radiation levels in the containment are 37 R/hr.
  • Hydrogen concentration in the drywell is 9.2%.
  • No release is in progress.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

§ No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

§ Do NOT shine any type light into a panel.

This JPM is time critical.

You are to determine if any Emergency Action Levels have been exceeded.

Evaluator: Log START TIME as soon as the Initiating Cue is read and acknowledged by the examinee.

START TIME:

Page 5 of 11

JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS EP-AA-1003 Radiological Emergency Plan Annex For Clinton Station

  • JPM Step 1 Examinee determines that a Site Area Emergency EAL has been exceeded due to FS1 Loss or Potential Loss of ANY two barriers.

Standard: Examinee reviews EP-AA-1003 Hot Matrix and determines that FS1 threshold has been exceeded due to:

  • Potential Loss of Fuel Clad because RPV level cannot be restored and maintained > -162 inches (TAF).
  • Loss of Reactor Coolant System because Containment Radiation Monitor is reading > 33 R/hr and RPV level cannot be restored and maintained > -

162 inches (TAF).

  • Potential Loss of Containment because Drywell hydrogen concentration 9%

Cue: Acknowledge report from the examinee.

Comments Evaluator Note: A 15-minute clock to declare the EAL starts as soon as the initiating cue is read and acknowledged via 3-part communication by the examinee. Record the time of the declaration below. The time declared must be no more than 15 minutes from the START TIME.

Record Time EAL Declared ___________

Record Start Time (from Page 5) ___________

NOT longer than 15 minutes between the time EAL Declared and Start Time:

YES / NO Page 6 of 11

JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

SAT £ UNSAT £ Comment Number JPM Step 2 Evaluator provides an additional cue.

Standard: Examinee acknowledges the additional information provided by the evaluator.

Cue: After the EAL call has been made, cue the examinee as follows:

  • Hydrogen concentration in the Drywell is now 10.2%.
  • Radiation level in the containment is now 103 R/hr.
  • No release is in progress.

Determine if any Emergency Action Levels have been exceeded.

Comments Evaluator Note: A 15-minute clock to declare the EAL starts as soon as the initiating cue in JPM step 2 is read and acknowledged via 3-part communication by the examinee.

Record Start Time ___________

SAT £ UNSAT £ Comment Number Page 7 of 11

JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

  • JPM Step 3 Examinee determines that a General Emergency EAL has been exceeded due to FG1 Loss of ANY two barriers AND Loss or Potential Loss of third barrier.

Standard: Examinee reviews EP-AA-1003 Hot Matrix and determines that FG1 threshold has been exceeded due to:

  • Loss of Fuel Clad because Containment Radiation Monitor is reading >

41.3 R/hr.

  • Loss of Reactor Coolant System because Containment Radiation Monitor is reading > 33 R/hr and RPV level cannot be restored and maintained > -

162 inches (TAF).

  • Potential Loss of Containment because Containment Radiation Monitor is reading > 97 R/hr and DW Hydrogen concentration is 9%.

Cue: Acknowledge report from the examinee. Ask examinee to determine what (if any)

Protective Action Recommendations (PARs) are required.

Comments Evaluator Note: A 15-minute clock to declare the EAL starts as soon as the initiating cue is read and acknowledged via 3-part communication by the examinee. Record the time of the declaration below. The time declared must be no more than 15 minutes from the START TIME.

Record Time EAL Declared ___________

Record Start Time (from JPM Step 2) ___________

NOT longer than 15 minutes between the time EAL Declared and Start Time:

YES / NO SAT £ UNSAT £ Comment Number Page 8 of 11

JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

  • JPM Step 4 Examinee determines the protective action recommendation is to Evacuate Sub Area 1 for a 2 mile radius and 10 miles downwind.

Standard: Examinee reviews EP-AA-111-F-07 Clinton PAR Flowchart and determines that a Rapidly Progressing Severe Accident is not in progress (primary containment has not be lost), requiring evacuation of Sub Area 1.

Cue: When requested, cue the examinee that wind direction is 159°.

Comments SAT £ UNSAT £ Comment Number TERMINATING CUES:

EAL thresholds evaluated and Protective Action Recommendations determined.

STOP TIME:

Page 9 of 11

JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Determine a Protective Action Recommendation JPM Number: JPM482 Revision Number: 00 Task Number and

Title:

997777.02, Determine a Protective Action Recommendation K/A System K/A Number Importance (RO/SRO)

Generic 2.4.44 2.4 4.4 Knowledge of emergency plan protective action recommendations.

Suggested Testing Environment: Simulator Actual Testing Environment: £ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: ¢ Yes £ No Time Critical: ¢ Yes £ No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

  • EP-AA-111, Emergency Classification and Protective Action Recommendations, Rev. 19
  • EP-AA-1003 Addendum 3 Emergency Action Levels For Clinton Station, Rev. 1
  • EP-AA-111-F-07, Clinton Plant based Par Flowchart, Rev G
  • EP-AA-112-100-F-01 Shift Emergency Director Checklist, Rev. V EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 11

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the Shift Manager.

The plant was operating at rated thermal power when a transient occurred.

Plant conditions are as follows:

  • Reactor Water level is -177 inches and lowering with no injection sources available.
  • Radiation levels in the containment are 37 R/hr.
  • Hydrogen concentration in the drywell is 9.2%.
  • No release is in progress.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

§ No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

§ Do NOT shine any type light into a panel.

This JPM is time critical.

You are to determine if any Emergency Action Levels have been exceeded.

Page 11 of 11

CLINTON POWER STATION Job Performance Measure Transfer RR Pumps from Fast to Slow Speed JPM Number: JPM448 Revision Number: 02 Date: 9/14/16 Developed By: Tony Jennings 9/14/16 Instructor Date Validated By: Brian Glynn 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM448_R2 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111

JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 3302.01 Rev: 35f Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 12

JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 2/23/11 Modified from JPM 215. Removed alternate path.

01 11/27/12 Updated procedure references.

02 8/29/16 Updated procedure references. Converted to new template.

Made editorial changes throughout. Added new instructions for setting up the IC.

Page 3 of 12

JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. IC Setup
a. Reset the simulator to IC-7 or equivalent with power 33%.
b. Lower RR flow (if necessary) until reactor power is ~ 33%.
c. Perform CPS 3006.01 Unit Shutdown steps 8.2.1 - 8.2.4.
d. Ensure plant is stable and then save to a different IC if JPM is being used more than once.

IC-228 (pw: 76319) is saved for the ILT 15-1 NRC Exam.

2. JPM Setup
a. Reset the simulator to the IC saved in 1.d above with power ~ 33%.
b. Open and execute Simulator Lesson Plan ILT 15-1 NRC Exam JPMs/JPM448 containing the following:
1) RR_FBYPSA to Bypass on Remote1
2) RR_FBYPSB to Bypass on Remote2
c. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
d. This completes the setup for this JPM.

Page 4 of 12

JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS 3302.01, Rev 35f Reactor Recirculation (RR)

EVALUATOR INSTRUCTIONS:

  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Provide the examinee with a copy of CPS 3302.01, Reactor Recirculation (RR) and applicable REMA with the cue sheet.
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

Page 5 of 12

JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A plant shutdown is in progress with power at approximately 33% of rated thermal power. One TDRFP is in operation with level control on the Master Level Controller (MLC).

INITIATING CUE:

As the Reactor Operator you are directed to transfer the Reactor Recirculation Pumps to Slow Speed per CPS 3302.01 Reactor Recirculation (RR) and the REMA.

Annunciators associated with Reactor Recirculation Pump transfer are to be considered Expected Annunciators and treated as such.

The Field Operator is available via PCS phone. RP has been notified.

The B RO will respond to all back-panel annunciators.

START TIME:

Page 6 of 12

JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

CPS 3302.01, REACTOR RECIRCULATION

  • 8.1.3.1 1. Start both LFMGs:
  • Close LFMG A Bkr 1A for RR pump 1A.
  • Close LFMG B Bkr 1B for RR pump 1B Standard: Examinee depresses the CLOSE pushbutton for LFMG A Mtr Bkr 1A and LFMG B Mtr Bkr 1B (red light is on and the green light is off for both breakers).

Cue: As CRS respond to A RO report of start of the LFMGs. If candidate requests condition of LFMGs from the field, report both LFMGs are operating normally.

Comments The field cue will be performed by the Simulator Booth Operator (Field Operator) if candidate uses PCS phone to contact the Field Operator.

SAT £ UNSAT £ Comment Number Page 7 of 12

JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM) 8.1.3.2 (Local) At 1B33-P001A and B, LFMG Aux Relay Panel, place following keylock switches to BYPASS:

A pump: ° S126A, Power Interlock (Both on FB 781 East)

° S127A, Total Feedwater Low Flow Interlock B pump: ° S126B, Power Interlock (Both on FB 781 West)

° S127B, Total Feedwater Low Flow Interlock Standard: Examinee requests area operator to place S126A&B and S127A&B in BYPASS at panels 1B33-P001A and 1B33-P001B.

Cue: Insert REMOTE 1 and REMOTE 2 and inform the examinee that S126A&B and S127A&B are in BYPASS.

Comments The cue will be performed by the Simulator Booth Operator (Field Operator) if candidate uses PCS phone to contact the Field Operator.

SAT £ UNSAT £ Comment Number 8.1.3.3 Make the following RR pump transfer notifications:

1) Notify RP of potential change in Rad levels.
2) Make a plant wide Gaitronics announcement that the RR pumps will be transferred to slow.

Standard: Simulates calling RP to notify them of potential rad level changes.

Simulates making Gaitronics announcement, Transferring RR Pumps to Slow Speed.

Cue: Respond as RP acknowledging notification of changing rad levels.

Comments Part of initiating cue. Candidate should recognize condition met. Only respond if needed.

SAT £ UNSAT £ Comment Number Page 8 of 12

JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

  • 8.1.3.4 Place both 1B33-F060A & B, Recirc FCVs at ~ 10%, but not > 10% position.

Standard: Examinee positions both FCV slide levers (one at a time) to the left until both 1B33-F060A & B, Recirc FCVs are at ~ 10% (but not > 10%) position.

Cue:

Comments Alarms 5006-3D OPRM Enabled, 5004-3D & 5005-3D TCV/TSV Trip Bypassed, and 5006-3H Low Power Alarm Point are expected alarms.

SAT £ UNSAT £ Comment Number

  • 8.1.3.5 Transfer the RR pumps to the LFMG by depressing both TRANSFER TO LFMG A and B push-buttons simultaneously.

Standard: Examinee simultaneously depresses both RECIRC PUMP A & B DRIVE MOTOR BKR 5A & 5B TRANS TO LFMG A and B push-buttons.

Cue: As CRS respond to A RO report of RR Pump transfer to slow speed.

Comments SAT £ UNSAT £ Comment Number Page 9 of 12

JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM) 8.1.3.6 Observe that the 5A and 5B breakers open and when pump speed decreases, the 2A and 2B breakers close.

Standard: Examinee observes that the 5A and 5B breakers open (red light off, green light on) and when pump speed decreases the 2A and 2B breakers close (red light on, green light off).

Cue: State that the JPM is complete Comments SAT £ UNSAT £ Comment Number TERMINATING CUES:

RR Pumps A and B have been shifted to slow speed.

STOP TIME:

Page 10 of 12

JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ NLO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Transfer RR Pumps from Fast to Slow Speed JPM Number: JPM448 Revision Number: 02 Task Number and

Title:

330201.24 RR Pump Transfer To Slow Speed K/A System K/A Number Importance (RO/SRO) 202001 A4.01 3.7 3.7 Ability to manually operate and/or monitor in the control room:

Recirculation pumps.

Suggested Testing Environment: Simulator Actual Testing Environment: ¢ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

  • CPS No. 3302.01, Rev 35f REACTOR RECIRCULATION (RR)

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 11 of 12

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A plant shutdown is in progress with power at approximately 33% of rated thermal power. One TDRFP is in operation with level control on the Master Level Controller (MLC).

INITIATING CUE:

As the Reactor Operator you are directed to transfer the Reactor Recirculation Pumps to Slow Speed per CPS 3302.01 Reactor Recirculation (RR) and the REMA.

Annunciators associated with Reactor Recirculation Pump transfer are to be considered Expected Annunciators and treated as such.

The Field Operator is available via PCS phone. RP has been notified.

The B RO will respond to all back-panel annunciators.

Page 12 of 12

CLINTON POWER STATION Job Performance Measure Turbine Driven Reactor Feed Pump (TDRFP) B Startup (Alternate Path)

JPM Number: JPM530 Revision Number: 01 Date: 9/16/16 Developed By: T. Jennings 9/16/16 Instructor Date Validated By: Michael Antonelli 10/25/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM530_1 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 3103.01 Rev: 31 Procedure CPS 5002.02 Rev: 29e Procedure CPS 5002.03 Rev: 28b

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 13

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 7/25/14 New JPM.

01 9/16/16 Updated procedure references.

Page 3 of 13

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. IC Setup
a. Initialize to any suitable IC (comparable with IC-26) with TDRFP A on the MLC in auto and the TDRFP B in rolling standby.
b. Save to a different IC if JPM is being used more than once. IC-225 is saved for the ILT 15-1 NRC Exam (password 76319).
2. JPM Setup
a. Reset the simulator to the IC saved in step 1 above.
b. Open and execute Simulator Lesson Plan ILT 15-1 NRC Exam JPMs.
c. Release JPM530 which will perform the following:
  • Insert vibration alarms and indications when TDRFP B speed is increased above 2800 rpm.
  • Insert seat leakage into the HPSV & HPCV (9% & 2% respectively)
a. MS0ASLVALVE41 9%
b. MS0ASLVALVE40 2%
3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
4. This completes the setup for this JPM.
5. Freeze Simulator.

Page 4 of 13

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Mitigating actions have been taken for high vibrations on the B TDRFP and the RFP has been secured.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 5002.03, Rev 28b Alarm Panel 5002 Annunciators - Row 3 EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Provide the examinee with a marked up copy of CPS 3103.01 Feedwater (FW) with section 8.1.4.2 TDRFP NORMAL Startup to Rolling STANDBY marked complete.

Page 5 of 13

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A reactor startup / power ascension is in progress.

Reactor power is ~ 50%.

Turbine Driven Reactor Feed Pump (TDRFP) A is operating on the Master Level Controller (MLC) in auto feeding the RPV.

TDRFP B is in rolling standby IAW CPS 3103.01 Feedwater (FW) section 8.1.4.2 TDRFP NORMAL Startup to Rolling STANDBY.

5 Condensate Polishers (A - E) are in service.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

The CRS has directed you to place TDRFP B in service feeding the RPV using the AUTO method IAW CPS 3103.01 Feedwater (FW) section 8.1.4.4. Transfer rolling STANDBY TDRFP to feeding RPV through 1FW002A (B).

Permission has been granted to perform all critical steps required to perform the task.

Report to the CRS after completing the task.

START TIME:

Page 6 of 13

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 3103.01 Feedwater (FW) section 8.1.4.4 Transfer rolling STANDBY TDRFP to feeding RPV through 1FW002A (B)

Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 8.1.4.4 Transfer rolling STANDBY TDRFP 8.1.4.4.1 B to feeding RPV through Examinee determines TDRFP B is in rolling 1FW002B. standby per the initiating cue.

8.1.4.4.2 Examinee determines that 5 Condensate Polishers are adequate to perform the evolution.

Cue: 5 Condensate Polishers are in service.

8.1.4.4.3 Examinee observes Red M on the Digital Feedwater Display for 1FW010B and the 1FW010B valve icon is red.

8.1.4.4.4 Examinee clicks on:

  • FPB
  • TDRFP B (and observes the blue outline on the control box)
  • (and observes TDRFP B RPM decreasing to ~ 2370 rpm)
  • Exit
  • 8.1.4.4.5 Examinee clicks on:
  • Valve icon for 1FW002B
  • TDRFP Main Discharge Valve 1FW002B (and observes the blue outline on the control box)
  • Open (and then verifies indication changes to Intermediate and then Full Open)
  • Exit Page 7 of 13

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 8.1.4.4 Transfer rolling STANDBY TDRFP B to *8.1.4.4.6 feeding RPV through 1FW002B (cont.) Examinee clicks on:
  • Valve icon for 1FW010B
  • 1FW010B Min Flow (and observes the blue outline on the control box)
  • Close
  • Exit Note: 1FW010B will not physically close with TDRFP B reset and 1FW002B full open.

If the examinee depresses the 1FW010B close pushbutton before 1FW002B is full open, 1FW010B will close. If this happens, the error should be considered a failure of a critical step.

NOTE Step 8.1.4.4.7 is N/A.

  • 8.1.4.4 *8.1.4.4.8 (cont.) Examinee observes that TDRFP B indicates FPB Speed Setter.

Examinee clicks on:

  • FPB Speed Setter
  • TDRFP B Speed Setpoint Mode (and observes the blue outline on the control box)
  • Bring Pump On-Line (and then verifies TDRFP B speed increasing)
  • Exit Page 8 of 13

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

ALTERNATE PATH BEGINS Annunciator 5002-2F High Vibr RFP 1B Shaft will be received when TDRFP B speed increases above 2800 rpm.

Annunciator 5002-3F High Vibr RFPT 1B Shaft will be received 30 seconds later.

Comment SAT UNSAT STEP ELEMENT STANDARD Number 8.1.4.4.8 Reduce Turbine Speed to clear vibration 8.1.4.4.8.c alarms (fails) Examinee clicks on:

5002-2F

  • FPB Speed Setter 5002-3F
  • TDRFP B Speed Setpoint Mode (and observes the blue outline on the control box)
  • Speed Setter Mode
  • Exit Examinee clicks on:
  • FPB (pump icon)
  • TDRFP B (and observes the blue outline on the control box)
  • until setpoint (SP) indicates 0 RPM (and then observes that TDRFP B speed begins to lower, but stabilizes at ~ 2000 RPM and that annunciators 5002-2F and 3F remain locked in)
  • Exit Cue: If the examinee requests an Equipment Operator to investigate, acknowledge the order and then cue the examinee, Vibrations can be felt on the floor of TB 800. Im leaving due to safety concerns.

Page 9 of 13

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number 8.1.10 TDRFP Shutdown 8.1.10.1 Examinee discusses with the CRS the need to lockout the RR FCVs during the TDRFP S/D.

Cue: Do not lockout the RR FCVs.

Note: If the examinee elects to trip B TDRFP based on the report from the Equipment Operator, this step is NA.

8.1.10.4 Examinee clicks on:

  • FPB Trip/Reset pushbutton
  • TDRFP B (and observes the blue outline on the control box)
  • TDRFP B Trip (and then observes that the HP and LP Stop Valves remain full open)
  • Exit (may or may not perform)

Examinee reports failure of the B TDRFP to trip to the CRS.

  • 8.3.14 Securing A TDRFP That Will Not Trip 8.3.14.1 From P680 On 1H13-P680-5002, the examinee depresses the L pushbutton on the B TDRFP SLIM Controller and verifies the L pushbutton red light illuminates.

8.3.14.2 No action required; the SLIM is at 0%

output.

  • 8.3.14.3 Examinee locates control switch for 1B21-F303B on 1H13-P870-5016, rotates the control switch counter clockwise to the close position, and then verifies the green light illuminates and the red light extinguishes.

Examinee verifies TDRFP B RPM lowering, and that the high vibration annunciators clear.

Cue: the JPM is complete.

Page 10 of 13

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

TERMINATING CUES:

The B TDRFP is secured IAW CPS No. 3103.01 section 8.3.14 Securing A TDRFP That Will Not Trip From P680.

STOP TIME:

Page 11 of 13

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Turbine Driven Reactor Feed Pump (TDRFP) B Startup (Alternate Path)

JPM Number: JPM530 Revision Number: 00 Task Number and

Title:

310301.40d TDRFP Normal Startup/Rolling Standby Operation K/A System K/A Number Importance (RO/SRO) 259001 A4.02 3.9 3.7 Ability to manually operate and/or monitor in the control room:

Manually start/control a RFP/TDRFP Suggested Testing Environment: Simulator Actual Testing Environment: ¢ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: ¢ Yes £ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 25 minutes Actual Time Used: minutes

References:

CPS No. 3103.01, Rev 31 Feedwater (FW)

CPS 5002.02, Rev 29e Alarm Panel 5002 Annunciators - Row 2 CPS No. 5002.03, Rev 28b Alarm Panel 5002 Annunciators - Row 3 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 12 of 13

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A reactor startup / power ascension is in progress.

Reactor power is ~ 50%.

Turbine Driven Reactor Feed Pump (TDRFP) A is operating on the Master Level Controller (MLC) in auto feeding the RPV.

TDRFP B is in rolling standby IAW CPS 3103.01 Feedwater (FW) section 8.1.4.2 TDRFP NORMAL Startup to Rolling STANDBY.

5 Condensate Polishers (A - E) are in service.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

The CRS has directed you to place TDRFP B in service feeding the RPV using the AUTO method IAW CPS 3103.01 Feedwater (FW) section 8.1.4.4. Transfer rolling STANDBY TDRFP to feeding RPV through 1FW002A (B).

Permission has been granted to perform all critical steps required to perform the task.

Report to the CRS after completing the task.

Page 13 of 13

CLINTON POWER STATION Job Performance Measure Steam Bypass Valve Tests JPM Number: JPM419 Revision Number: 00 Date: 2/18/15 Developed By: T. Jennings 2/18/15 Instructor Date Validated By: Matt Baker 10/25/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM419_0 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 9072.01 Rev: 32e Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 12

JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 2/18/15 New JPM.

Page 3 of 12

JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. Reset the simulator to an IC with the Main Turbine On-line.
2. No Simulator Lesson Plan is required for this JPM.
3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
4. This completes the setup for this JPM.
5. Save to a different IC if JPM is being used more than once. IC-225 is saved for the ILT 15-1 NRC Exam (password 76319).
6. Freeze Simulator.
7. Station a training instructor to monitor Main Turbine Bypass Valve Positions at 1H13-P678 and to initial IV blanks in 9072.01 Table 2: BPV Test Data when requested.

Page 4 of 12

JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • The Steam Bypass Valve Tests are complete IAW CPS 9072.01 Steam Bypass Valve Tests.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 9072.01, Rev 32e Steam Bypass Valve Tests EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • This JPM contains cues provided to the examinee from the instructor stationed at 1H13-P678.

Review these cues with the instructor to ensure the communications between the instructor and examinee are clear and coordinated.

Page 5 of 12

JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The reactor is in Mode 1 at ~ 50% power.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

You are an extra RO. The CRS has directed you to perform CPS 9072.01 Steam Bypass Valve Tests.

CPS 9072.01 Section 5.0 Prerequisites are complete.

The activity has been screened for production risk.

Another operator will monitor BPV positions at 1H13-P678.

Report to the CRS after completing the task.

START TIME:

Page 6 of 12

JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 9072.01 Steam Bypass Valve Tests Comment SAT UNSAT STEP ELEMENT STANDARD Number Step 8.2 1 Performs pre-test verifications.

Examinee locates the position meters for Bypass Valves 1-6 on 1H13-P678 and verifies they read 0% and then initials step 8.2 of the surveillance.

  • Note to evaluator - if the examinee requests the training instructor stationed at P678 to perform the verification, cue the examinee to perform the verifications instead.

Procedure step 8.3 is NA - step only applies if the plant is shutdown with a low vacuum condition present.

Step 8.4

  • 2 Aligns system for testing.

Examinee locates and depresses the BPV testing push-button on 1H13-P680-5006, and then verifies the:

  • TESTING light energizes
  • READY TO SELECT light energizes
  • OFF light de-energizes Examinee initials blanks for steps 8.4.1, 8.4.2, and 8.4.3.

Page 7 of 12

JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 3 Strokes #1 BPV from fully open to fully 8.5.1.3 shut. Examinee depresses and holds the TEST BPV 1 push-button on 1H13-P680-5006 and observes the following:
1. Annunciator 5006-5M BYPASS VALVE OPEN CHECK LPSP alarms
2. The #1 BPV fast acting solenoid energizes during the last 5-15% of of travel.
3. The #1 BPV CLOSED light is de-energized.
4. The #1 BPV FULL OPEN light is energized.
5. 1H13-P678 meter indication for #1 BPV indicates ~ 100% and stops moving.

Cue - When #1 BPV reaches 100% open, the Training Instructor stationed at 1H13-P678 should cue the examinee that #1 BPV opened quickly the last 10% of opening travel and that the meter stopped moving.

8.5.1.4 Examinee releases the TEST BPV 1 push-button on 1H13-P680-5006 and observes the following:

1. The #1 BPV FULL OPEN light is de-energized.
2. The #1 BPV OPEN light is de-energized.
3. The #1 BPV CLOSED light is energized.
4. 1H13-P678 meter indication for #1 BPV indicates ~ 0% and stops moving.
5. Annunciator 5006-5M BYPASS VALVE OPEN CHECK LPSP resets Cue - When #1 BPV reaches 0% open, the Training Instructor stationed at 1H13-P678 should cue the examinee that #1 BPV meter is indicating 0% and has stopped moving.

Page 8 of 12

JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number Evaluators

  • JPM Step #4 is optional - if desired, cue the examinee to proceed to CPS 9072.01 step 8.6 and perform step 8.6 and remaining steps of the surveillance.
  • If performing JPM step #4 on the remaining Bypass Valves, the examinee should allow a 7 minute stabilization period between cycling each BPV (procedure recommendation only).

8.5.2.3 (8.5.3.3, 8.5.4.3, 8.5.5.3, 8.5.6.3)

Examinee depresses and holds the TEST BPV 2-6 push-buttons (one at a time) on 1H13-P680-5006 and observes the following:

1. Annunciator 5006-5M BYPASS VALVE OPEN CHECK LPSP alarms for each valve tested.
2. The respective BPV fast acting solenoid energizes during the last 5-15% of of travel.
3. The respective BPV CLOSED light is de-energized.

Strokes #2 - 6 BPVs fully open, and

4. The respective BPV FULL OPEN then fully shut.

light is energized.

5. 1H13-P678 meter indication for the respective BPV indicates ~ 100%

and stops moving.

  • 4 Cue - When respective BPV reaches (optional) 100% open, the Training Instructor stationed at 1H13-P678 should cue the examinee that #1 BPV opened quickly the Evaluator placekeeping table - check after each BPV is tested. last 10% of opening travel and that the BPV BPV BPV BPV BPV meter stopped moving.
  1. 2 #3 #4 #5 #6 8.5.2.4 (8.5.3.4, 8.5.4.4, 8.5.5.4, 8.5.6.4)

Examinee releases the TEST BPV 1 push-button on 1H13-P680-5006 and observes the following:

1. The respective BPV FULL OPEN light is de-energized.
2. The respective BPV OPEN light is de-energized.
3. The respective BPV CLOSED light is energized.
4. 1H13-P678 meter indication for #1 BPV indicates ~ 0% and stops moving.
5. Annunciator 5006-5M BYPASS VALVE OPEN CHECK LPSP resets Page 9 of 12

JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number Cue - When the respective BPV reaches 0% open, the Training Instructor stationed at 1H13-P678 should cue the examinee that the BPV meter is indicating 0% and has stopped moving.

8.6 - When all bypass valves have been tested, examinee momentarily depresses the OFF push-button on 1H13-P680-5006, and then verifies the following:

  • TESTING light de-energizes
  • READY TO SELECT light de-energizes
  • OFF light energizes
  • 5 Restores system alignment.

8.7 - Notifies the Electrical Supply Dispatcher and the Exelon Power Team of the test completion.

Cue - Notify the examinee that the JPM is complete.

TERMINATING CUES:

The Steam Bypass Valves have been tested IAW CPS 9072.01 Steam Bypass Valve Tests.

STOP TIME:

Page 10 of 12

JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Steam Bypass Valve Tests JPM Number: JPM419 Revision Number: 00 Task Number and

Title:

907201.01 Steam Bypass Valve Tests K/A System K/A Number Importance (RO/SRO) 241000 A4.06 3.9 3.9 Reactor Turbine Pressure Regulating System - Ability to manually operate and/or monitor in the control room: Bypass valves (operation).

Suggested Testing Environment: Simulator Actual Testing Environment: ¢ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 10 minutes* Actual Time Used: minutes

  • only if JPM step 4 is omitted, otherwise 60 minutes

References:

CPS No. 9072.01, Rev 32e Steam Bypass Valve Tests EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 11 of 12

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The reactor is in Mode 1 at ~ 50% power.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

You are an extra RO. The CRS has directed you to perform CPS 9072.01 Steam Bypass Valve Tests.

CPS 9072.01 Section 5.0 Prerequisites are complete.

The activity has been screened for production risk.

Another operator will monitor BPV positions at 1H13-P678.

Report to the CRS after completing the task.

Page 12 of 12

CLINTON POWER STATION Job Performance Measure Perform a HPCS Pump Operability Test (Alternate Path)

JPM Number: JPM288 Revision Number: 02 Date: 8/29/16 Developed By: Tony Jennings 8/29/16 Instructor Date Validated By: Matt Baker 10/25/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM288_R2 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111

JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 9051.01 Rev: 48 Procedure CPS 9051.01D001 Rev: 48 Procedure CPS 5062.04 Rev: 27b

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 12

JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 0 6/21/12 New JPM 1 8/4/14 Updated procedure references.

2 8/29/16 Updated procedure references.

Page 3 of 12

JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. IC Setup
a. Reset the simulator to any at power IC with HPCS Suction aligned to the RCIC Storage Tank (E22F001 open, E22F015 shut).
b. Place the HPCS Out of Service Switch to INOP.
c. Place the HPCS Test Prep Switch to TEST.
d. Save to a different IC if JPM is being used more than once. IC-225 (pw: 76319) is saved for the ILT 15-1 NRC Exam.
2. Simulator Setup
a. Reset the simulator to the IC established in step 1 above.
b. Open and execute Simulator Lesson Plan ILT 15-1 NRC Exam JPMs.
c. Release JPM288 to cause the following:
  • Energizes 1E22-F010 (completed prerequisite in 9051.01)
  • Fails 1E22-F001 Green light to off and Red light to on
  • Close 1E22-F001 (simulates suction clogging/collapsing) when HPCS flow is approximately greater than 2000 gpm.
  • Fails 1E22-F015 Control Switch to the Close position.
d. Verify HPCS Out of Service Switch to INOP.
e. Verify HPCS Test Prep Switch to TEST.
3. WHEN IC IS RESET, OVERRIDE SWITCH CHECK FOR A05-A02-A15S23 (if necessary).

Page 4 of 12

JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • HPCS Pump has been tripped due to loss of suction source.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 9051.01, Rev 48 HPCS Pump HPCS Water Leg Pump Operability
  • CPS No. 9051.01D001, Rev 48 HPCS Pump HPCS Water Leg Pump Operability Data Sheet
  • CPS No. 5062.04, Rev 27b Alarm Panel 5062 Annunciators - Row 4 EVALUATOR INSTRUCTIONS:
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Provide the examinee with marked up copies of :

o CPS No. 9051.01, HPCS Pump & HPCS Water Leg Pump Operability - up to and including step 8.2.7.1.

o CPS No. 9051.01D001, HPCS Pump & HPCS Water Leg Pump Operability Data Sheet -

up to and including any data collected up to step 8.2.7.1.

  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

Page 5 of 12

JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the Extra RO assuming the shift.

CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability is in progress.

An Equipment Operator is stationed locally at the HPCS Pump and has established communication with the Main Control Room.

INITIATING CUE:

Continue performing CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability commencing at step 8.2.7.2.

Inform the CRS when section 8.2 is complete.

START TIME:

Page 6 of 12

JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

9051.01 HPCS PUMP & HPCS WATER LEG PUMP OPERABILITY 8.2.7.2 Verify HPCS WATER LEG DISCHARGE PRESSURE LOW annunciator 5062-7D is cleared.

Standard: Examinee observes annunciator 5062-7D is clear (not illuminated).

Cue:

Comments SAT £ UNSAT £ Comment Number

Standard: Examinee places control switch for 1E22-C001 to the START position. Verifies RED light ON, GREEN light OFF. Observes HPCS motor current pegging high and then lowering into the meter green band.

Cue:

Comments SAT £ UNSAT £ Comment Number Page 7 of 12

JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM) 8.2.7.4.1 Observe/perform (Record): Verify 1E22-F012, HPCS Pump Min Flow To Suppr Pool, indicates open.

Standard: Examinee observes RED light ON, GREEN light OFF for 1E22-F012. Records SAT on the data sheet for step 8.2.7.4.1 (D001 page 6).

Cue:

Comments SAT £ UNSAT £ Comment Number

  • 8.2.7.4.2 Alternately slowly throttle open both 1E22-F010 and 1E22-F011, HPCS First and Second Test Vlv To Storage Tank, and increase flow to ~ 5050 gpm as read on Comp Pt HP-DA301.

Standard: Examinee alternately places both control switches for 1E22-F010 and 1E22-F011 to the throttle open position.

Cue: If examinee reports receipt of Annunciator 5062-4D, acknowledge report.

Comments The suction line will start clogging when HPCS flow exceeds approximately 2000 gpm. HPCS Pump amps and flow will rapidly oscillate.

SAT £ UNSAT £ Comment Number Page 8 of 12

JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

BEGINS ALTERNATE PATH 5062-4D, HPCS PUMP SUCTION PRESSURE ABNORMAL NOTE: Steps 1 and 2 may be performed in any order.

1. Verify/establish an available HPCS Suction Path (1E22-F001 preferred unless RCIC Tank/Suction Piping is not available) per CPS 3309.01, High Pressure Core Spray (HPCS). Refer to CPS 3309.01 (HPCS) CLOC PRECAUTION criteria.

Standard: Examinee verifies 1E22-F001 is full open (red light ON, green light OFF).

Cue:

Comments Examinee may elect to trip the HPCS Pump based on abnormal indications without referring to the Annunciator Response Procedure. This is an acceptable action.

SAT £ UNSAT £ Comment Number

  • 2 If HPCS pump is running for testing, and normal suction pressure was not restored by the previous step, trip the HPCS pump.

Standard: Examinee trips the HPCS Pump using the associated control switch.

Cue: If an operator is dispatched to investigate, cue the examinee that loud surging noises are coming from the HPCS Pump.

Comments SAT £ UNSAT £ Comment Number Page 9 of 12

JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Informs Control Room Supervisor.

Standard: Examinee informs Control Room Supervisor the HPCS was tripped per Annunciator Response Procedure.

Cue: Acknowledge the report. State JPM is complete.

Comments SAT £ UNSAT £ Comment Number TERMINATING CUES:

HPCS Pump has been tripped due to loss of suction source.

STOP TIME:

Page 10 of 12

JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ NLO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Perform a HPCS Pump Operability Test (Alternate Path)

JPM Number: JPM288 Revision Number: 02 Task Number and

Title:

905101.06 - HPCS Pump & HPCS Water Leg Pump Operability K/A System K/A Number Importance (RO/SRO) 209002 A4.01 3.7 3.7 Ability to manually operate and/or monitor in the control room: HPCS pump.

Suggested Testing Environment: Simulator Actual Testing Environment: ¢ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: ¢ Yes £ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

  • CPS No. 9051.01, Rev 47e HPCS Pump HPCS Water Leg Pump Operability
  • CPS No. 9051.01D001, Rev 48 HPCS Pump HPCS Water Leg Pump Operability Data Sheet
  • *CPS No. 5062.04, Rev 27B Alarm Panel 5062 Annunciators - Row 4
  • Procedures with an asterisk do not need to be copied for the JPM administration.

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 11 of 12

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the Extra RO assuming the shift.

CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability is in progress.

An Equipment Operator is stationed locally at the HPCS Pump and has established communication with the Main Control Room.

INITIATING CUE:

Continue performing CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability commencing at step 8.2.7.2.

Inform the CRS when section 8.2 is complete.

Page 12 of 12

CLINTON POWER STATION Job Performance Measure Place Feedwater Leakage Control (FWLC) In-Service JPM Number: JPM473 Revision Number: 00 Date: 9/14/16 Developed By: T. Jennings 9/14/16 Instructor Date Validated By: Matt Baker 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM473_R0 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 3312.01 Rev: 45b Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 10

JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 9/14/16 New JPM.

Page 3 of 10

JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. IC Setup
a. Reset the simulator to any shutdown IC.
b. Open or verify open 1B21-F065A and B RPV Inlet Valves.
c. Open and execute Simulator Lesson Plan JPM473 containing the following:
1) RAT_B_DIFFERENTIAL
2) YP_XMFTB_1 HPCS PMP MTR COUPLING FAILURE
3) YFRIPPSS RCIC PUMP SHEARED SHAFT
4) Ed01LMalfMot(32) = 3 LPCS Motor Short Circuit
5) Ed01LMalfMot(35) = 3 RHR Pump C002C Motor Short Circuit
6) YPXMALSE_510 RR03B-RR B SUCTION LINE LEAK (51%)
d. Allow ADS to automatically initiate and depressurize the RPV.
e. Ensure plant is stable and then save to a different IC if JPM is being used more than once.

IC-227 (pw: 76319) is saved for the ILT 15-1 NRC Exam.

2. JPM Setup
a. Reset the simulator to the IC saved in Section 1 above with the reactor shutdown, a LOCA present, and RHR A and B operating in LPCI injection mode.
b. No Simulator Lesson Plan is required once the IC has been established.
c. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
d. This completes the setup for this JPM.
e. Place the simulator in freeze.

Page 4 of 10

JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Examinee has successfully placed the Feedwater Leakage Control System (FWLCS) in service.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

EVALUATOR INSTRUCTIONS:

  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

Page 5 of 10

JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A Loss of Coolant Accident has occurred.

FW/CB/CD injection is no longer available.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

This is a time critical JPM.

The CRS has directed you to place Feedwater Leakage Control System (FWLCS) in service per CPS 3312.01 Residual Heat Removal (RHR) section 8.3.1 Feedwater Leakage Control System (FWLCS).

Report to the CRS when the task has been completed.

START TIME:

Page 6 of 10

JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 3312.01, Residual Heat Removal (RHR) Section 8.3.1 Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 1 Aligns RHR A and B to the Feedwater 8.3.1.1 Leakage Control (FWLC) System. Examinee determines FW/CB/CD injection is no longer available.

Cue: If asked, cue the examinee that FW/CB/CD injection is no longer available.

Evaluator - Record current time: ________

  • 8.3.1.2 Examinee rotates the control switches for 1B21-F065A and B RPV Inlet Valves (1H13-P870-5016) counter clockwise to the close position and verifies green lights are illuminated and red lights are extinguished.

8.3.1.3 Examinee observes that RPV pressure is <

330 psig using PPC or MCR meter indications.

8.3.1.4 Examinee observes that RHR Pumps A and B are operating in LPCI mode.

  • 8.3.1.5 On 1H13-P601-5065, examinee turns the control switch for 1E12-F496, RHR to Feedwater B Keep Fill Valve clockwise to the Open position and verifies red light illuminated and green light extinguished.

Page 7 of 10

JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 1 (contd) *8.3.1.6 On 1H13-P601-5064, examinee turns the control switch for 1E12-F497, RHR to Feedwater A Keep Fill Valve clockwise to the Open position and verifies red light illuminated and green light extinguished.

Evaluator - Record current time: ________

Evaluator - Verify times recorded in step 8.3.1.6 and 8.3.1.1 does not exceed 20 minutes.

Cue: State the JPM is complete.

TERMINATING CUES:

RHR A and B are aligned to the Feedwater Leakage Control (FWLC) System.

STOP TIME:

Page 8 of 10

JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Place Feedwater Leakage Control (FWLC) In-Service JPM Number: JPM473 Revision Number: 00 Task Number and

Title:

331201.22 Feedwater Leakage Control System (FWLCS)

K/A System K/A Number Importance (RO/SRO) 223001 A2.01 4.3 4.4 Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of coolant accident Suggested Testing Environment: Simulator Actual Testing Environment: ¢ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: ¢ Yes £ No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

CPS 3312.01, Rev 45b RESIDUAL HEAT REMOVAL (RHR)

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 10

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A Loss of Coolant Accident has occurred.

FW/CB/CD injection is no longer available.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

This is a time critical JPM.

The CRS has directed you to place Feedwater Leakage Control System (FWLCS) in service per CPS 3312.01 Residual Heat Removal (RHR) section 8.3.1 Feedwater Leakage Control System (FWLCS).

Report to the CRS when the task has been completed.

Page 10 of 10

CLINTON POWER STATION Job Performance Measure Re-energize 4160V Bus 1A JPM Number: JPM503 Revision Number: 01 Date: 9/16/16 Developed By: T. Jennings 9/16/16 Instructor Date Validated By: Brian Glynn 10/25/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM503_R1 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 4200.01 Rev: 24 Procedure CPS 3501.01 Rev:28c Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 10

JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 11/17/12 New JPM.

01 9/16/16 Updated procedure references. Updated to new template.

Page 3 of 10

JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. IC Setup
a. Initialize to any suitable at power IC.
b. Verify CRD Pump B is running.
c. Insert a manual scram and allow the MDRFP to stabilize RPV level.
d. Place the following control switches in PTL or Lock/Stop:
1) Component Cooling Water Pump 1A, 1CC01PA
2) Component Cooling Water Pump 1C, 1CC01PC
3) Plant Service Water Pump 1A, 1WS01PA
4) Plant Service Water Pump 1C, 1WS01PC
5) Service Air Compressor 0, 0SA01C
6) Condensate Pump 1A, 1CD01PA
7) Condensate Pump 1C, 1CD01PC
8) Condensate Booster A, 1CB01PA / Cond Booster Pmp 1A Aux Lube Oil Pmp, 1CB07PA
9) Condensate Booster C, 1CB01PC / Cond Booster Pmp 1C Aux Lube Oil Pmp, 1CB07PC
e. Save to a different IC if JPM is being used more than once. IC-226 (IC Password: 76319) is saved for ILT 15-1 NRC Exam. When IC-226 is reset, override switch check for A04_A23_S06 (if necessary).
2. JPM Setup
a. Reset the simulator to the IC saved in Section 1 above.
b. Open and execute simulator lesson plan ILT 15-1 NRC Exam JPMs.
c. Release JPM503 which performs the following:
1) Inserts override to switch 4160V BUS 1A RES BKR 1AP06EM to the PTL position.
2) Overrides 1AP06EM GREEN LITE to ON.
d. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
e. This completes the setup for this JPM.
f. Freeze Simulator.

Page 4 of 10

JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • 4160 Volt Bus 1A is re-energized per CPS 4200.01 Loss of AC Power section 4.3 and CPS 3501.01 High Voltage Auxiliary Power System section 8.1.2 Energizing 4160V Bus 1A, 1AP06E.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 4200.01, Rev 24 Loss Of AC Power
  • CPS No. 3501.01, Rev 28c High Voltage Auxiliary Power System EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Provide the examinee with copies of CPS 4200.01 Loss of AC Power and CPS 3501.01 High Voltage Auxiliary Power System marked up as follows:

o CPS 4200.01, section 4.3, all steps complete up to and including step 4.3.3.2.

o CPS 3501.01 (blank)

Page 5 of 10

JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A scram has occurred.

4160V Bus 1A failed to transfer to the reserve source due to a breaker failure.

The breaker failure has been corrected.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

You are the B RO.

The CRS has directed you to re-energize 4160V Bus 1A IAW CPS 4200.01 Loss of AC Power, section 4.3 Loss of Non-ECCS Busses.

In CPS 4200.01 section 4.3, all steps are complete up to and including step 4.3.3.2 (completed by another Reactor Operator). Equipment control switches listed in CPS 4200.01 Appendix A for 4160V Bus 1A have been placed in PULL-TO-LOCK or LOCKED and verified.

After 4160V Bus 1A has been re-energized, restoration actions will be performed by another Reactor Operator.

Report to the CRS after completing the task.

START TIME:

Page 6 of 10

JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 4200.01 Loss of AC Power CPS 3501.01 High Voltage Auxiliary Power Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 1 Prepares 4160V Bus 1A for re-energization. *CPS 4200.01 step 4.3.3.3 On 1H13-P870-5012, examinee places the following control switches in PTL:
  • 4160V Bus 1A Mn Bkr 1A 1AP06EK
  • 4160V Bus 1A Res Bkr 1A 1AP06EM Cue: If asked about the availability of DC control power to 4160V Bus 1A, cue the examinee that DC control power was unaffected by the failure.

CPS 4200.01 step 4.3.3.4 Examinee proceeds to CPS 3501.01 High Voltage Auxiliary Power System to re-energize 4160V Bus 1A.

CPS 3501.01 step 8.1.2.1 Examinee verifies that 4160V Bus 1A Mn Bkr 1A 1AP06EK and 4160V Bus 1A Res Bkr 1A 1AP06EM are in the Pull-To-Lock position (performed in CPS 4200.01 step 4.3.3.3 above).

CPS 3501.01 step 8.1.2.2 On 1H13-P870-5012, examinee opens/verifies open (green light illuminated, red light extinguished) the following breakers:

  • 480V XFMR Q & I BKR, 1AP06EJ
  • 480V XFMR G & K BKR, 1AP06EQ CPS 3501.01 steps 8.1.2.3 & 8.1.2.4 Examinee verifies control switches for 4160V Bus 1A loads are in Pull-To-Lock or Lock/Stop.

Evaluator note - no action is required by the examinee. This verification was noted as complete in the initiating cue.

Page 7 of 10

JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 2 Re-energizes 4160V Bus 1A *CPS 3501.01 step 8.1.2.5 On 1H13-P870-5012, examinee places 4160V Bus 1A Res Bkr Sync switch to ON.
  • CPS 3501.01 step 8.1.2.6 On 1H13-P870-5012, examinee places 4160V Bus 1A Res Bkr 1AP06EM in CLOSE (red light illuminated and green light extinguished).

CPS 3501.01 step 8.1.2.7 Examinee verifies 4160 Bus 1A energized by observing any/all of the following indications:

  • Bus energized red light
  • 4160 V Bus 1A Voltage Meter on P870

CPS 3501.01 step 8.1.2.8 On 1H13-P870-5012, examinee places 4160V Bus 1A Res Bkr Sync switch to OFF.

CPS 3501.01 step 8.1.2.9 Examinee may place 4160V Bus 1A Mn Bkr, 1AP06EK C/S to AUTO.

Evaluator note - Examinee may N/A step 8.1.2.9 in anticipation of placing the plant in a normal shutdown alignment. If that occurs, is should not be considered a competency hit.

CPS 3501.01 step 8.1.2.10 Re-energize 480V Unit Subs No action required by examinee.

Cue - State that the JPM is complete.

TERMINATING CUES:

4160V Bus 1A is re-energized IAW CPS 4200.01 Loss of AC Power and CPS 3501.01 High Voltage Auxiliary Power System.

STOP TIME:

Page 8 of 10

JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Re-energize 4160V Bus 1A JPM Number: JPM503 Revision Number: 01 Task Number and

Title:

350101.17 Energize 4160V Bus 1A 1AP06E K/A System K/A Number Importance (RO/SRO) 295003 AA1.01 3.7 3.8 Ability to operate and/or monitor the following as they apply to PARTIAL OR COMPLETE LOSS OF A.C. POWER: A.C. electrical distribution system.

Suggested Testing Environment: Simulator Actual Testing Environment: ¢ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: ¢ Yes £ No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

  • CPS 4200.01, Rev 24 Loss of AC Power
  • CPS 3501.01, Rev 28c High Voltage Auxiliary Power System EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 10

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A scram has occurred.

4160V Bus 1A failed to transfer to the reserve source due to a breaker failure.

The breaker failure has been corrected.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

You are the B RO.

The CRS has directed you to re-energize 4160V Bus 1A IAW CPS 4200.01 Loss of AC Power, section 4.3 Loss of Non-ECCS Busses.

In CPS 4200.01 section 4.3, all steps are complete up to and including step 4.3.3.2 (completed by another Reactor Operator). Equipment control switches listed in CPS 4200.01 Appendix A for 4160V Bus 1A have been placed in PULL-TO-LOCK or LOCKED and verified.

After 4160V Bus 1A has been re-energized, restoration actions will be performed by another Reactor Operator.

Report to the CRS after completing the task.

Page 10 of 10

CLINTON POWER STATION Job Performance Measure Restore ADS Air Supply To Normal Source JPM Number: JPM427 Revision Number: 02 Date: 8/29/16 Developed By: T. Jennings 8/29/16 Instructor Date Validated By: Matt Baker 10/25/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM427_R2 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 3101.01 Rev: 23e Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 13

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 07/28/10 Update Procedure Revs, KAs and JPM number (31010107LSN02) 01 06/14/13 Updated to new template 02 8/29/16 Updated procedure references. Made editorial changes to the simulator setup instructions.

Page 3 of 13

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions Simulator Setup

1. Initialize to any suitable shutdown IC.
2. Place ADS Backup Air Bottles in service with 1IA012A & 13A open, and 1IA012B & 13B shut IAW 3101.01 Steps 8.2.4.1 through 8.2.4.2.
3. Save to a different IC if JPM is being used more than once. IC-226 (PW 76319) is saved for the ILT 15-1 NRC Exam.

JPM Administration

1. Initialize to IC-226 (PW 76319).
2. Open and execute Simulator Lesson Plan ILT 15-1 NRC Exam JPMs.
3. Release JPM427 which will insert the following instructor overrides and malfunctions:
  • Fail 1PI-IA079 to 125 psig (0.5) on a 2 minute ramp when 1IA013A is shut.
  • Fail 1PI-IA078 to 125 psig (0.5) on a 2 minute ramp when 1IA012A is shut.
  • Delete the 1PI-IA079 (P601) instructor override when 1IA013A is reopened.
  • Delete the 1PI-IA078 (P601) instructor override when 1IA012A is reopened.
  • Clear Annunciator 5040-6F when both 1IA013A and 1IA012A open.
4. Prepare a (blank) administration copy of CPS 3101.01 MAIN STEAM (MS, IS & ADS) for candidate place-keeping.
5. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
6. This completes the setup for this JPM.
7. Freeze Simulator.

Page 4 of 13

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

ADS)

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

EVALUATOR INSTRUCTIONS:

  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.

Page 5 of 13

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the B RO.

Due to a loss of IA, the ADS backup air bottles were placed in service.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

Instrument Air has been restored.

Return ADS to the normal air supply per 3101.01 Main Steam (MS, IS & ADS) step 8.2.4.5.

Report to the CRS after completing the task.

START TIME:

Page 6 of 13

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS No. 3101.01 MAIN STEAM (MS, IS & ADS)

  • 8.2.4.5.1 Place Control Switches for 1IA012A AND 1IA013A, ADS IA CNMT Outbd Isol Vlv to CLOSE.

Standard: At 1H13-P800-5041, examinee:

  • locates the control switch for 1IA012A and rotates the switch counter clockwise to the CLOSE position and then verifies the Green light comes ON and the Red light goes OFF.
  • locates the control switch for 1IA013A and rotates the switch counter clockwise to the CLOSE position and then verifies the Green light comes ON and the Red light goes OFF.

Cue:

Comments SAT £ UNSAT £ Comment Number

  • 8.2.4.5.2 Place Control Switches for 1IA012B AND 1IA013B, ADS IA CNMT Inbd Isol Vlv to OPEN.

Standard: At 1H13-P800-5041, examinee:

  • locates the control switch for 1IA012B and rotates the switch clockwise to the OPEN position and then verifies the Red light comes ON and the Green light goes OFF.
  • locates the control switch for 1IA013B and rotates the switch clockwise to the OPEN position and then verifies the Red light comes ON and the Green light goes OFF.

Cue:

Page 7 of 13

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Comments SAT £ UNSAT £ Comment Number 8.2.4.5.3 Return Control Switches for 1IA012A AND 1IA013A to AUTO.

Standard: At 1H13-P800-5041, examinee:

  • Locates the control switch for 1IA012A and rotates the switch clockwise to the AUTO position.
  • Locates the control switch for 1IA013A and rotates the switch clockwise to the AUTO position.

Cue:

Comments No valve movement will occur when the 1IA012A and 13A control switches are restored to AUTO.

SAT £ UNSAT £ Comment Number 8.2.4.5.4 Verify ADS Air Hdr Pressure on 1H13-P601 (1PI-IA078 / 79) is 160 - 170 psig.

Standard: Locates 1PI-IA078 / 79 on 1H13-P601-5067 and determines air pressure is less than 160 psig.

Cue: If the examinee requests an Equipment Operator to check air amplifier operation, cue him/her that the Containment is not accessible.

Comments SAT £ UNSAT £ Comment Number Page 8 of 13

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

ALTERNATE PATH BEGINS HERE Annunciator 5040-6F High/Low Press ADS IA Supply Div 1 or 2.

Alternate Path Responds to Annunciator 5040-6F High/Low Press ADS IA Supply Div 1 or 2.

Step 1 OPERATOR ACTIONS

4. As appropriate, shift to ADS Backup Air Bottles or Normal IA Standard: Examinee refers to Annunciator Response Procedure 5040-6F and determines that Operator Action 4 applies.

Cue: If the examinee reports receipt of annunciator 5040-6F, acknowledge the report.

Comments SAT £ UNSAT £ Comment Number CPS No. 3101.01 MAIN STEAM (MS, IS & ADS)

  • Alternate Shut 1IA012B, ADS IA CNMT Inbd Isol Vlv. Verify 1IA012A, ADS IA Path Step 2 CNMT Outbd Isol Vlv opens.
  • 8.2.4.1 Standard:
  • Examinee locates the control switch for 1IA012B ADS IA CNMT Inbd Isol Vlv on 1H13-P800-5041, rotates the switch counter clockwise and then verifies the Green light comes ON and the Red light goes OFF.
  • Examinee locates the control switch for 1IA012A and verifies the Red light comes ON and the Green light goes OFF.

Cue:

Comments Closing 1IA012B is the only portion of the step that is critical.

SAT £ UNSAT £ Comment Number Page 9 of 13

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

  • Alternate Shut 1IA013B, ADS IA CNMT Inbd Isol Vlv. Verify 1IA013A, ADS IA Path Step 3 CNMT Outbd Isol Vlvs opens.

8.2.4.2 Standard:

  • Examinee locates the control switch for 1IA013B ADS IA CNMT Inbd Isol Vlv on 1H13-P800-5041, rotates the switch counter clockwise and then verifies the Green light comes ON and the Red light goes OFF.
  • Examinee locates the control switch for 1IA013A and verifies the Red light comes ON and the Green light goes OFF.

Cue:

Comments Closing 1IA013B is the only portion of the step that is critical.

SAT £ UNSAT £ Comment Number JPM Step 8 Verify (1H13-P601, 5067):

8.2.4.3 o ADS Instrument Air Hdr Pressure, 1PI-IA078/79 > 147.5 psig.

o ADS Backup Air Hdr Pressure, 1PI-IA080/81 > 2300 psig.

Standard:

Cue: If the examinee reports that the ADS Backup Air Bottles have been placed on service, acknowledge the report.

Comments SAT £ UNSAT £ Comment Number Page 10 of 13

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

TERMINATING CUES:

ADS Backup Air Bottles have been placed in service IAW CPS No. 3101.01 Main Steam (MS, IS, &

ADS) section 8.2.4 Placing ADS Backup Air Bottles On Service.

STOP TIME:

Page 11 of 13

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Restore ADS Air Supply To Normal Source JPM Number: JPM427 Revision Number: 02 Task Number and

Title:

310101.08 Complete control room actions to perform placing ADS backup air bottles in service.

K/A System K/A Number Importance (RO/SRO) 300000 A4.01 2.6 2.7 Ability to manually operate and/or monitor in the control room:

Pressure gauges Suggested Testing Environment: Simulator Actual Testing Environment: ¢ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: ¢ Yes £ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

  • CPS 5040.06 (6F) HIGH/LOW PRESS ADS IA SUPPLY DIV 1 OR 2, Rev. 28b EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 12 of 13

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the B RO.

Due to a loss of IA, the ADS backup air bottles were placed in service.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

Instrument Air has been restored.

Return ADS to the normal air supply per 3101.01 Main Steam (MS, IS & ADS) step 8.2.4.5.

Report to the CRS after completing the task.

Page 13 of 13

CLINTON POWER STATION Job Performance Measure VF Trip During Swap of VC Trains (Alternate Path)

JPM Number: JPM474 Revision Number: 00 Date: 9/14/16 Developed By: T. Jennings 9/14/16 Instructor Date Validated By: Michael Antonelli 10/25/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM474_R0 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 3402.01P001 Rev: 6b Procedure CPS 3319.01 Rev:17 Procedure CPS 3404.01 Rev:13e

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 14

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 9/14/16 New JPM.

Page 3 of 14

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. IC Setup
a. Reset the simulator to any shutdown or at power IC with VC Train A in service and VC Train B secured.
b. Insert Remote Function VC10VC_CHILLERATCC OFF to secure VC Chiller A.
c. Ensure plant is stable and then save to a different IC if JPM is being used more than once.

IC-225 (pw: 76319) is saved for the ILT 15-1 NRC Exam.

2. JPM Setup
a. Reset the simulator to the IC saved in Section 1 above.
b. Open and execute Simulator Lesson Plan ILT 15-1 NRC Exam JPMs.
c. Release JPM474 which will trigger the following when the 0VC03CB Cont Rm Sply Fan is started:
1) A12_A06_DS164_1 OFF (1VF06Y/7Y Green Light Off)
2) A12_A06_DS142_1 ON (1VF07Y Green Light On)
3) A12_A05_S24 OFF (VF Exhaust Fans Off)
4) A12_A05_DS124_1 ON (1VF04CA/B Amber Light On)
5) A12_A05_DS70_1 OFF (1VF03CA/B Red Light Off)
6) A12_A05_DS68_1 ON (1VF03CA/B Amber Light On)
7) A12_A05_DS69_1 ON (1VF03CA/B Green Light On)
d. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
e. This completes the setup for this JPM.

Page 4 of 14

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Examinee has successfully placed one of the two Standby Gas Treatment Trains in service to restore secondary containment differential pressure.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS 3402.01P001, Rev 6b CONTROL ROOM HVAC (VC) TRAIN SHIFTING
  • CPS 3319.01, Rev. 17 STANDBY GAS TREATMENT (VG)
  • CPS 3404.01, Rev. 13e FUEL BUILDING HVAC (VF)

EVALUATOR INSTRUCTIONS:

  • This JPM was developed from events detailed in LER 2014-001-00 Premature Failure Of Air Supply Solenoid Results in Isolation of Fuel Building Ventilation System and Loss of Secondary Containment Pressure.
  • During performance of this JPM, when 0VC03CB Main Control Room Ventilation (VC)

System B Supply fan is started, the resultant voltage transient will result in a trip of the Fuel Building Supply and Exhaust Fans and high differential pressure in the Secondary Containment. These conditions will require the examinee to pursue the alternate path task to start one of the two Standby Gas Treatment (VG) Trains to restore Secondary Containment differential pressure.

  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Provide the examinee with a marked up copy of CPS 3402.01P001, CONTROL ROOM HVAC (VC) TRAIN SHIFTING with the cue sheet ONLY. Do NOT provide copies of CPS 3319.01 or CPS 3404.01 until prompted to do so after JPM step 3 and step 4.
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

Page 5 of 14

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

Main Control Room Ventilation (VC) Train A is in-service.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

The CRS has directed you to shift Control Room HVAC (VC) trains to B in service and A secured in accordance with CPS 3402.01P001 CONTROL ROOM HVAC (VC) TRAIN SHIFTING starting at step 8.1.7.4.2.

The following steps have already been completed:

  • 8.1.7.1 - 8.1.7.3 (all steps)
  • 8.1.7.4.1
  • 8.1.7.5.1 - 8.1.7.5.6
  • 8.1.7.6.1 - 8.1.7.6.6 Report to the CRS when the task has been completed.

START TIME:

Page 6 of 14

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 3402.01P001, Control Room HVAC (VC) Train Shifting Section 8.1.7.4 Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 1 Secures VC Ventilation Train A. 8.1.7.4.2 On panel 1H13-P801-5050, examinee shuts 0VC69Y Locker Rm Exh Fan 11C Isol Dmpr.

8.1.7.4.3 On panel 1H13-P801-5052, examinee shuts 0VC70Y Locker Rm Exh Fan 11C Isol Dmpr.

8.1.7.4.4 On panel 1H13-P801-5050, examinee verifies 0VC11C Cont Rm Locker Rm Exhaust Fan not running (green light illuminated, red light extinguished).

8.1.7.4.5 On panel 1H13-P801-5050, examinee either secures or leaves running Cont Rm HVAC Eq Rm Sply Fan 0VC18CA.

Cue: If asked, cue the examinee to leave 0VC18CA running.

8.1.7.4.6 Examinee verifies CPS 3402.01P001 section 8.1.7.3 Chiller Shutdown is complete.

  • 8.1.4.7 On panel 1H13-P801-5050, examinee secures 0VC03CA, Cont Rm Trn A Supply Fan.

Page 7 of 14

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 1 8.1.7.4.8 (contd)

On 1H13-P801-5050, examinee verifies the following VC A Ventilation components automatically realign:

0VC03YA damper shuts 0VC115YA damper shuts 0VC04CA, Cont Rm Rtrn Fan stops 0VC08YA damper shuts 0VC08PA, Cont Rm Ch Wtr Pump A stops 0VC21YA damper shuts 0VC24YA damper shuts 0VC27YA damper shuts 0VC30YA damper shuts 0VC33YA damper shuts 0VC36YA damper shuts 0VC39YA damper shuts 0VC04YA damper shuts

  • 2 Starts VC Ventilation Train B. 8.1.7.5.7 On 1H13-P801-5050 and 5052, examinee verifies 0VC01YA, Cont Rm Trn A Min OS Air Dmpr and 0VC01YB, Cont Rm Trn B Min OS Air Dmpr are open (red light illuminated, green light extinguished)
  • 8.1.7.5.8 On 1H13-P801-5052, examinee starts 0VC03CB, Cont Rm Trn B Supply Fan (red light illuminated, green light extinguished).

Begin Alternate Path CPS 5042-5D High Diff Press Fuel Bldg Page 8 of 14

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number 3 Responds to High Differential Pressure in Operator Action 1 the Fuel Building (Secondary Containment Dispatches an operator to local panel 1PL44J to determine cause of the high differential pressure condition.

Cue: If the examinee does not respond to 1H13-P800-5042 alarms, cue him/her to report 1H13-P800 alarms and take appropriate actions.

Cue: when examinee reports trip of the Fuel Building Ventilation System to the CRS, acknowledge the report and direct the examinee to respond to annunciators as appropriate.

Cue: (when asked to investigate local panel alarm), acknowledge the order and state, I am on my way to the panel to investigate.

Operator Action 3 Starts the Standby Gas Treatment System.

Cue - If the examinee reports to the CRS that 5042-5D references ITS LCO 3.6.4.1 and may be reportable per SAF 1.8, acknowledge the report and state that you will refer to Technical Specifications and the Reportability Manual.

CPS 3319.01 STANDBY GAS TREATMENT (VG) (Provide copy to the examinee) (hard card use is acceptable) 4 Makes preparations for starting one of the 8.2.1.1 two Standby Gas Treatment System trains.

Verify/secure all diesel exhaust sources (i.e., truck engines in the Fuel Bldg) which have the potential of being drawn into VG charcoal beds.

Cue - If asked about diesel exhaust sources in the Fuel Building, cue the examinee that there are no diesel exhaust sources in the Fuel Building.

8.2.1.2 Examinee verifies either 0RIX-PR003 or PR004, SGTS Stack PRM in-service and operable.

Cue - If asked about the operability status of 0RIX-PR003 and/or PR004, state that both monitors are operable.

Page 9 of 14

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number 8.2.1.3

  • 4 (contd) Examinee notifies RP that VG will be manually started.

Cue - When examinee reports that VG will be manually started, acknowledge the report.

8.2.1.4 Notifies Chemistry after SGTS flow is initiated to perform sampling per CPS 9940.01, Weekly Chemistry Surveillance Log.

Cue - when the examinee requests Chemistry to perform sampling per CPS 9940.01 acknowledge the order.

8.2.1.5 Examinee monitors Secondary Containment pressure using Secondary CNMT DP (Div 1 - 5050) or Secondary CNMT DP (Div 2 - 5052) on 1H13-P801 as needed through the remainder of this section.

8.2.1.6 Examinee performs manual shutdown and isolation of VF using CPS 3404.01, Fuel Building HVAC (VF) to prevent tripping on high differential pressure.

CPS 3404.01 Fuel Building HVAC (VF) (Provide copy to the examinee) 5 Performs manual shutdown and isolation of 8.3.1.1 VF.

Notifies RP of pending VF system shutdown.

Cue - when the examinee reports pending VF system shutdown, acknowledge the report.

8.3.1.2 Examinee directs equipment operator to turn Heater 1VF02A H/S to OFF.

Cue - as the Area Operator, report that the 1VF02A handswitch was already off.

Page 10 of 14

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number 8.3.1.3 - 8.3.1.7 5 (contd)

Examinee directs equipment operator to perform local panel 1PL44J shutdown actions for the Fuel Building Ventilation System.

Cue - as the Area Operator, report that steps CPS 3404.01 steps 8.3.1.3 - 8.3.1.7 are complete.

8.3.1.8 On 1H13-P801-5050, examinee closes 1VF04Y/9Y Fuel Bldg Sply Outbd Isol Dmprs (green lights illuminated, red lights extinguished).

8.3.1.9 On 1H13-P801-5052, examinee closes 1VF06Y/7Y Fuel Bldg Sply Inbd Isol Dmprs (green lights illuminated, red lights extinguished).

8.3.1.10 If desired, place 1RIX-PR019, Fuel Bldg CAM (EOP-8 Monitor) in STANDBY per CPS 3315.03 (AR/PR).

Cue - as the CRS, state that another operator will place 1RIX-PR019 in standby and to proceed with placing Standby Gas Treatment in service.

CPS 3319.01 STANDBY GAS TREATMENT (VG)

Page 11 of 14

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number

On 1H13-P801-5050 or 5052, the examinee places the selected SGTS train in service by starting SGTS Trn A(B) Exh Fan, 0VG02CA(B), and then performs the following verifications:

1VG17YA(B) Closes 1VG16YA(B) Closes 1VG04YA(B) Opens 1VG05YA(B) Opens 1VG06YA(B) Opens 1VG02YA(B) Opens 0VG01YA(B) Opens (modulates) 0VG04AA(B) Energizes 0VG02YA(B) Opens 0VG05YA(B) Opens 0VG03CA(B) Stops (if running) 0VG05CA(B) Starts (local indication)

Cue - when directed to verify status of 0VG05CA(B)(depending on which VG train was started), report that 0VG05CA(B) is running.

Cue - State that the JPM is complete when verifications are completed.

TERMINATING CUES:

The Standby Gas Treatment System has been manually initiated to restore Secondary Containment differential pressure.

STOP TIME:

Page 12 of 14

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

VF Trip During Swap of VC Trains (Alternate Path)

JPM Number: JPM474 Revision Number: 00 Task Number and

Title:

340401.05 Respond to High or Low Fuel Building Differential Pressure K/A System K/A Number Importance (RO/SRO) 288000 A4.01 3.1 2.9 Ability to manually operate and/or monitor in the control room: Start and stop fans.

Suggested Testing Environment: Simulator Actual Testing Environment: ¢ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: ¢ Yes £ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

  • CPS 3402.01P001, Rev 6b CONTROL ROOM HVAC (VC) TRAIN SHIFTING
  • CPS 3319.01, Rev. 17 STANDBY GAS TREATMENT (VG)
  • CPS 3404.01, Rev. 13e FUEL BUILDING HVAC (VF)

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 13 of 14

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

Main Control Room Ventilation (VC) Train A is in-service.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

The CRS has directed you to shift Control Room HVAC (VC) trains to B in service and A secured in accordance with CPS 3402.01P001 CONTROL ROOM HVAC (VC) TRAIN SHIFTING starting at step 8.1.7.4.2.

The following steps have already been completed:

  • 8.1.7.1 - 8.1.7.3 (all steps)
  • 8.1.7.4.1
  • 8.1.7.5.1 - 8.1.7.5.6
  • 8.1.7.6.1 - 8.1.7.6.6 Report to the CRS when the task has been completed.

Page 14 of 14

CLINTON POWER STATION Job Performance Measure RCIC Startup at the RSP - Alternate Path JPM Number: JPM247 Revision Number: 03 Date: 9/19/16 Developed By: T. Jennings 9/19/16 Instructor Date Validated By: Brian Glynn 10/25/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM247_R3 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 4003.01 Rev: 17c Procedure CPS 4003.01C002 Rev: 5a Procedure CPS 4003.01C003 Rev: 1 Procedure OP-AA-101-111 Rev: 9

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 08/08/09 Updated numbering convention and technically corrected. Old JPM number: 40030104LSA01.

01 06/06/12 Updated format, aligned with procedure revision and revision numbers.

02 10/09/12 Revision due to procedure and template revision.

03 9/19/16 Updated procedure references.

Page 3 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. IC Setup
a. To establish initial conditions for JPM247, perform the following actions:
1) Reset to any at power IC.
2) Place Reactor Mode Switch in Shutdown and stabilize RPV level below level 3 but above level 2 with the Motor Driven Reactor Feed Pump. May have to secure RD Pumps to get level down.
3) Open and execute Simulator Lesson Plan JPM247 to cause the RSP RCIC Flow Controller to be overridden in Manual.
4) Place the simulator in Run.
5) Depress the RCIC Flow Controller Close Pushbutton until controller output is at zero.
6) Save to a different IC if JPM is being used more than once. IC-226 (PW-76319) is saved for the ILT 15-1 NRC Exam.
2. JPM Administration
1) Reset the simulator to the IC saved in step 1 above.
2) Verify command A17_A01_A02_4 RSP RCIC Turb Flow Controller - Man/Auto =

Manual is active.

3) Place book of Remote Shutdown procedures in RSP Room.
4) Verify RCIC is not initiated.
5) Verify the RCIC controller at the Remote Shutdown Panel is in Auto set at 620 gpm.
6) Verify the RCIC suction is aligned to the RCIC Storage Tank.
7) No simulator lesson plan is required for this JPM once initial conditions have been established per step 1.
8) Freeze Simulator.

Page 4 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • The RCIC System is started from the Remote Shutdown Panel and injecting to the Reactor Vessel to restore and control RPV water level, Level 3 to Level 8 per CPS 4003.01C002 RSP -

RCIC Operation.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • OP-AA-101-111, ROLES AND RESPONSIBILITES OF ON-SHIFT PERSONNEL EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • When the examinee has acknowledged the initiating cue, provide him/her with the following procedures:

o CPS 4003.01 Remote Shutdown (RS) - place kept with step 4.1.1 marked N/A.

o CPS 4003.01C002 RSP - RCIC Operations (blank) o CPS 4003.01C003 RSP - RCIC Alarm Light Responses (blank)

Page 5 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A plant transient has resulted in a reactor scram, loss of Feedwater, and loss of RCIC control from 1H13-P601.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

The CRS directs you to startup the RCIC system from the Remote Shutdown Panel and inject to the Reactor Vessel to restore and control RPV water level from Level 3 to Level 8 per CPS 4003.01 Remote Shutdown (RS) section 4.3, CPS 4003.01C002, RSP - RCIC Operation and CPS 4003.01C003, RSP -

Alarm Light Responses.

Inform the CRS when the task is complete.

START TIME:

Page 6 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS 4003.01C002 RSP - RCIC Operation 4.0 RCIC TRANSFER TO THE RSP

4.1 Verify

1. Power to 4160V Bus 1A1 available as indicated by the following energized blue lights:
  • 120 VAC CONTROL POWER CKT #12, AB MCC 1A1
2. RCIC TURBINE TRIP in NORM.
3. RCIC TURB FLOW CONTROLLER, C61-R001 set to A (Automatic)/620 gpm.

Standard

  • For substep 1, the examinee verifies two blue lights lit on the upper left hand side of the Remote Shutdown Panel.
  • For substep 3, the examinee verifies the RCIC Turbine Flow Controller M/A slide switch is positioned to the right and the tape set is set to 620 gpm.

Cue: None Comments SAT £ UNSAT £ Comment Number Page 7 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

  • 4.2 Verify / Place following TRANSFER SWITCHES to EMERG:
1. C61-S3
2. C61-S2
3. C61-S11 Standard: Examinee places the above 3 switches in the EMERG position.

Cue: None Comments SAT £ UNSAT £ Comment Number 4.3 Verify GLAND SEAL COMPRESSOR, 1E51-C002F in STOP if compressor is off, or in START if the compressor is running.

Standard Examinee verifies control switch for the RCIC Gland Seal Compressor, 1E51-C002F is in the vertical position (STOP).

Cue: None Comments SAT £ UNSAT £ Comment Number Page 8 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

  • 4.4 Verify / Place TRANSFER SWITCH C61-S4 to EMERG.

Standard Examinee places Transfer Switch C61-S4 in the EMERG position.

Cue: None Comments SAT £ UNSAT £ Comment Number 4.5 Place/verify 1E51-F068, RCIC TURB EXH TO SUPPR POOL STOP VLV switch in OPEN.

Standard Examinee verifies 1E51-F068, RCIC Turb Exh To Suppr Pool Stop Vlv is in the OPEN position by verifying the control switch is rotated clockwise to the OPEN position and observing the RED status light is lit and the green status light is extinguished.

Cue: None Comments SAT £ UNSAT £ Comment Number Page 9 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

  • 4.6 Verify / Place TRANSFER SWITCH C61-S5 to EMERG.

Standard Examinee places Transfer Switch C61-S5 in the EMERG position.

Cue: None Comments SAT £ UNSAT £ Comment Number 4.7.1 Verify open 1E51-F063, RHR & RCIC STM SUPP INBD ISOL VALVE.

Standard Examinee verifies 1E51-F063 is OPEN by observing the RED status light is lit and the GREEN status light is off.

Cue: None Comments SAT £ UNSAT £ Comment Number Page 10 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM) 4.7.2 Verify open 1E51-F064, RHR & RCIC STM SUPP OUTBD ISOL VALVE.

Standard Examinee verifies 1E51-F064 is OPEN by observing the RED status light is lit and the GREEN status light is off.

Cue: None Comments Step 4.7.3 is N/A.

SAT £ UNSAT £ Comment Number 4.8 Check RCIC status:

  • RCIC TURB SPEED, C61-R003.
  • RCIC PUMP FLOW, C61-R001-1.

Standard Examinee observes meters C61-R003 and C61-R001-1 read 0 and determines RCIC is Shutdown.

Cue: None Comments SAT £ UNSAT £ Comment Number Page 11 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM) 4.8.1 IF RCIC is running, THEN verify that Section 5.0, RCIC STARTUP actions have occurred.

OTHERWISE, proceed to 5.0, RCIC STARTUP to startup RCIC.

Standard Examinee proceeds to Section 5.0 of 4003.01C002.

Cue: None Comments SAT £ UNSAT £ Comment Number 5.0 RCIC STARTUP 5.1 At DC MCC 1A-12A (1DC13E12A), Shut circuit #21.

[Energizes AOV 1E51-F005/F026 to allow for steam line/condensate pot drain down. Circuit will be deenergized in step 5.9.]

Standard Examinee states they would perform or dispatches an Equipment Operator to shut circuit #21 at DC MCC 1A-12A (1DC13E12A)

Cue: Acknowledge request/dispatch and state the component is in the position requested.

Comments SAT £ UNSAT £ Comment Number Page 12 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM) 5.2 Open 1E51-C002E, TURBINE TRIP THROTTLE VALVE.

[Trips on Mechanical Overspeed]

Standard Examinee verifies 1E51-C002E, Turbine Trip Throttle Valve is open by observing the RED status light is lit and the GREEN status light is extinguished.

Cue: None Comments SAT £ UNSAT £ Comment Number 5.3 IF RCIC Cond Stor Tnk Lvl, C61-R505 3.2 ft, or Suppression Pool Level, C61-R504 19.9 ft, THEN Open 1E51-F010, RCIC STORAGE TANK SUCTION VALVE, OTHERWISE Open 1E51-F031, RCIC SUPPR POOL SUCTION VALVE.

Standard Examinee observes RCIC Cond Stor Tnk Lvl and Suppression Pool Level indicators on the RSP and determines that RCIC tank level is > 3.2 ft and Suppression Pool Level is <19.9 ft and then determines 1E51-F010 is Open by observing the RED status light is lit and the GREEN status light is extinguished.

Cue: None Comments SAT £ UNSAT £ Comment Number Page 13 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM) 5.4 Open / Verify Open:

1. 1E51-F077, RCIC EXH VAC BKR OUTBD ISOL VALVE.
2. 1E51-F078, RCIC EXH VAC BKR INBD ISOL VALVE.

Standard Examinee verifies 1E51-F077, RCIC Exh Vac Bkr Outbd Isol Valve and 1E51-F078, RCIC Exh Vac Bkr Inbd Isol Valve are open by observing RED status lights are lit and GREEN status lights are extinguished.

Cue: None Comments SAT £ UNSAT £ Comment Number 5.5 Start GLAND SEAL COMPRESSOR, 1E51-C002F.

Standard Examinee rotates the control switch for the Gland Seal Compressor, 1E51-C002F clockwise to the start position and and verifies the RED status light is lit and the GREEN status light is extinguished.

Cue: None Comments This step is not critical because RCIC will perform its intended safety function without the Gland Seal Air Compressor running.

SAT £ UNSAT £ Comment Number Page 14 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

Standard Examinee rotates the control switch for 1E51-F019, RCIC Pmp Min Flow Recirc To Suppr Pool clockwise to the open position and verifies the RED status light is lit and the GREEN status light is extinguished.

Cue: None Comments SAT £ UNSAT £ Comment Number 5.7 Open / Verify Open 1E51-F068, RCIC TURB EXH TO SUPPR POOL STOP VLV.

Standard Examinee verifies 1E51-F068, RCIC Turb Exh To Suppr Pool Stop Vlv open by observing the RED status light is lit and the GREEN status light is extinguished.

Cue: None Comments SAT £ UNSAT £ Comment Number Page 15 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

Standard Examinee opens 1E51-F045, RCIC Turb Stm Supp Shutoff Valve and observes RED status light is lit and the GREEN status light is extinguished.

Cue: None Comments Due to RCIC Turbine Speed being low because of C61-R001 Controller failure, it is acceptable for the examinee to take manual control and adjust the C61-R001 Controller (manual actions for failed Auto Actions).

SAT £ UNSAT £ Comment Number 5.9 While continuing with steps 5.10 or 5.11:

At DC MCC 1A-12A (1DC13E12A), open circuit #21.

[Deenergizes AOV 1E51-F005/F026 to prevent possible steam releases (temp/rad concerns) into RCIC room and Turbine Bldg.]

Standard Examinee state they would perform or dispatches an equipment operator to open circuit #21 at DC MCC 1A-12A.

Acknowledge request/dispatch and state the component is in the position requested.

Comments SAT £ UNSAT £ Comment Number Page 16 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

Standard Examinee turns the control switch for 1E51-F013, RCIC Pump Disch To Rx Outbd Isol Valve clockwise to the open position and observes the RED status light is lit and the GREEN status light is extinguished.

Cue: None Comments Per limitation 3.5, the minimum flow orifice is sized for 60 to 76 gpm. RCIC pump operation under this condition should be limited to < 20 seconds to prevent potential degradation of internal pump parts.

SAT £ UNSAT £ Comment Number 5.10.2 Shut 1E51-F022, RCIC PMP FIRST TEST VALVE TO STOR TNK.

Standard Examinee verifies 1E51-F022, RCIC Pmp First Test Valve To Stor Tnk is shut by observing the RED status light is extinguished and the GREEN status light is lit.

Cue: None Comments Valve is normally shut.

SAT £ UNSAT £ Comment Number Page 17 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM) 5.10.3 Shut 1E51-F059, RCIC PMP SECOND TEST VALVE TO STOR TNK.

Standard Examinee verifies 1E51-F059, RCIC Pmp Second Test Valve To Stor Tnk is shut by observing the RED status light is extinguished and the GREEN status light is lit.

Cue: None Comments Valve is normally shut.

SAT £ UNSAT £ Comment Number 5.10.4 Adjust RCIC TURB FLOW CONTROLLER, C61-R001 to maintain flow 80 to 700 gpm.

NOTE: Avoid AUTO when < 450 gpm (see Precaution 1.4).

Standard Reports to SRO failure of RCIC controller or takes manual control of controller.

Cue: When the student reports the controller has failed, cue the Examinee: RCIC is needed to restore vessel level, inject with RCIC.

Comments Expected response it to take manual control to establish injection flow.

Cue/direction to restore level.

SAT £ UNSAT £ Comment Number BEGIN ALTERNATE PATH Page 18 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

  • Places controller C61-R001 selector to M (MANUAL).

Standard Examinee positions Controller C61-R001 mode selector to the left in M position.

Cue: None Comments OP-AA-101-111 step 4.7.2.5 directs taking manual control.

SAT £ UNSAT £ Comment Number

  • Adjusts controller in MANUAL to raise RCIC turbine speed and pump flow above minimum requirements and to achieve rising RPV level.

Standard Examinee adjusts Controller to establish >60 gpm flow and >1500 rpm and rising RPV level.

Cue: None Comments SAT £ UNSAT £ Comment Number Page 19 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM) 5.10.5 Shut 1E51-F019, RCIC PMP MIN FLOW RECIRC TO SUPPR POOL.

Standard Examinee shuts 1E51-F019, RCIC Pmp Min Flow Recirc To Suppr Pool and observes the RED status light is extinguished and the GREEN status light is lit.

Cue: None Comments Valve is normally shut.

SAT £ UNSAT £ Comment Number 5.10.6 Verify 1VY04C, RCIC PMP RM SPLY FAN has started.

Standard Examinee verifies 1VY04C, RCIC Pmp Rm Sply Fan has started by observing the RED status light is lit and the GREEN status light is extinguished.

Cue: None Comments SAT £ UNSAT £ Comment Number Task Completion Standard: Informs Control Room Supervisor he/she has commenced RCIC injection into the Reactor Pressure Vessel.

Cue: Acknowledge the report. State JPM is complete.

Comments SAT £ UNSAT £ Comment Number Page 20 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

STOP TIME: _____________________

Page 21 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

RCIC Startup at the RSP - Alternate Path JPM Number: JPM247 Revision Number: 02 Task Number and

Title:

40030104, Remote Shutdown tasks that DO require MCR evacuation K/A System K/A Number Importance (RO/SRO) 217000 A2.10 3.1 3.1 Ability to (a) predict the impacts of the following on the RCIC ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Turbine control system failures Suggested Testing Environment: Simulator Actual Testing Environment: ¢ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: ¢ Yes £ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

CPS 4003.01, REMOTE SHUTDOWN (RS), Rev. 17c CPS 4003.01C002, RSP - RCIC OPERATION, Rev. 5a CPS 4003.01C003, RSP - RCIC ALARM LIGHT RESPONSES, Rev. 1 OP-AA-101-111, ROLES AND RESPONSIBILITES OF ON-SHIFT PERSONNEL, Rev. 9*

  • Procedure is not required to be copied for JPM administration.

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 22 of 23

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A plant transient has resulted in a reactor scram, loss of Feedwater, and loss of RCIC control from 1H13-P601.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

The CRS directs you to startup the RCIC system from the Remote Shutdown Panel and inject to the Reactor Vessel to restore and control RPV water level from Level 3 to Level 8 per CPS 4003.01 Remote Shutdown (RS) section 4.3, CPS 4003.01C002, RSP - RCIC Operation and CPS 4003.01C003, RSP -

Alarm Light Responses.

Inform the CRS when the task is complete.

Page 23 of 23

CLINTON POWER STATION Job Performance Measure High Containment Pool Level Protective Actions JPM Number: JPM222 Revision Number: 02 Date: 09/19/2016 Developed By: Tony Jennings 09/19/16 Instructor Date Validated By: Brian Glynn 10/27/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM222_ R02 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 4411.05 Rev: 4b Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 13

JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 07/11/2007 Updated numbering convention. Old JPM number:

44110502NSN01.

01 08/02/2010 Updated format and task number 02 06/14/13 Updated to new template Page 3 of 13

JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

TASK STANDARDS:

  • Complete the Outside MCR portion of CPS No. 4411.05 High Containment Pool Level Protective Actions, Table 1, TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
  • None.

PROCEDURAL/

REFERENCES:

  • CPS No. 4411.05 Rev 4b, High Containment Pool Level Protective Actions.

EVALUATOR INSTRUCTIONS:

  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Do NOT allow examinee to shine any type of light into any panel.
  • Provide the Initiating Cue in the R&S Line in the Radwaste Building.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Once the initiating cue has been acknowledged by the examinee, provide him/her with a marked up copy of CPS 4411.05 High Containment Pool Level Protective Actions with the following notations:
  • Page 2, step 2.1, TABLE 1 STARTED: <10 minutes prior to current time>
  • Page 4, STARTED: <todays date> / <10 minutes prior to current time>
  • Page 4, step 1) MCR - fill in initials for MCR actions in Table 1 Page 4 of 13

JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The decision has been made to flood the Primary Containment. Current level in the Primary Containment is 22 5 and rising at ~1 every 5 minutes.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

§ No equipment or controls will be manipulated during this evaluation, only Simulated actions will occur.

§ Do NOT shine any type light into a panel.

You are directed to deenergize electrical loads per CPS No. 4411.05 High Containment Pool Level Protective Actions, Table 1, Section 2, OUTSIDE MCR.

Report to the CRS after completing the task.

START TIME:

Page 5 of 13

JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS No. 4411.05 High Containment Pool Level Protective Actions Deenergizes electrical equipment per Table 1, Section 2 Outside MCR.

At AB 781 East At AB MCC 1A1, Cubicle 1D place both breakers to the OFF position for

  • Drywell Cooling Fan 1A.

Standard:

  • Examinee wears the following PPE(as a minimum):

o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants

  • Examinee simulates rotating both breaker handles to the OFF position.

Cue: The breaker handles are in the position described.

Comments The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.

SAT £ UNSAT £ Comment Number Page 6 of 13

JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

At AB 762 East At AB MCC 1F, Cubicle 3D place both breakers to the OFF position for

  • Drywell Equip Drain Sump Pump 1A.

Standard:

  • Examinee wears the following PPE(as a minimum):

o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants

  • Examinee simulates rotating both breaker handles to the OFF position.

Cue: The breaker handles are in the position described.

Comments The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.

SAT £ UNSAT £ Comment Number Page 7 of 13

JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

At AB 762 East At AB MCC 1F, Cubicle 5B place both breakers to the OFF position for

  • Drywell Floor Drain Sump Pump 1A.

Standard:

  • Examinee wears the following PPE(as a minimum):

o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants

  • Examinee simulates rotating both breaker handles to the OFF position.

Cue: The breaker handles are in the position described.

Comments The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.

SAT £ UNSAT £ Comment Number Page 8 of 13

JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

At AB 762 West At AB MCC 1G, Cubicle 4A place both breakers to the OFF position for

  • Drywell Equip Drain Sump Pump 1B.

Standard:

  • Examinee wears the following PPE(as a minimum):

o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants

  • Examinee simulates rotating both breaker handles to the OFF position.

Cue: The breaker handles are in the position described.

Comments The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.

SAT £ UNSAT £ Comment Number Page 9 of 13

JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

At AB 762 West At AB MCC 1G, Cubicle 4C place both breakers to the OFF position for

  • Drywell Floor Drain Sump Pump 1B.

Standard:

  • Examinee wears the following PPE(as a minimum):

o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants

  • Examinee simulates rotating both breaker handles to the OFF position.

Cue: The breaker handles are in the position described.

Comments The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.

SAT £ UNSAT £ Comment Number Page 10 of 13

JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

At AB 781 West At AB MCC 1B1, Cubicle 2C place both breakers to the OFF position for

  • Drywell Cooling Fan 1B.

Standard:

  • Examinee wears the following PPE(as a minimum):

o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants

  • Examinee simulates rotating both breaker handles to the OFF position.

Cue: The breaker handles are in the position described.

Comments The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.

SAT £ UNSAT £ Comment Number TERMINATING CUES:

All breakers simulated being placed in the OFF position per CPS No. 4411.05 High Containment Pool Level Protective Actions, Table 1, Section 2, Outside MCR.

STOP TIME:

Page 11 of 13

JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

High Containment Pool Level Protective Actions JPM Number: JPM222 Revision Number: 02 Task Number and

Title:

441105.01 High Containment Pool Level Protective Actions K/A System K/A Number Importance (RO/SRO) 295029 2.4.35 3.8 4.0 Knowledge of local auxiliary operator tasks during an emergency and the resultant operational effects.

Suggested Testing Environment: Plant Actual Testing Environment: £ Simulator ¢ Plant £ Control Room Testing Method: ¢ Simulate Alternate Path: £ Yes ¢ No

£ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 18 minutes Actual Time Used: minutes

  • The JPM task would normally be assigned in the OSC; therefore 3 minutes were added on to the JPM Estimated Time to account for the transient time between the OSC and the R&S Line location

References:

CPS No. 4411.05 Rev 4b, High Containment Pool Level Protective Actions.

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 12 of 13

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The decision has been made to flood the Primary Containment. Current level in the Primary Containment is 22 5 and rising at ~1 every 5 minutes.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

§ No equipment or controls will be manipulated during this evaluation, only Simulated actions will occur.

§ Do NOT shine any type light into a panel.

You are directed to deenergize electrical loads per CPS No. 4411.05 High Containment Pool Level Protective Actions, Table 1, Section 2, OUTSIDE MCR.

Report to the CRS after completing the task.

Page 13 of 13

CLINTON POWER STATION Job Performance Measure Startup the Fuel Building HVAC VF System to support Emergency Containment Venting JPM Number: JPM431 Revision Number: 02 Date: 9/19/16 Developed By: T. Jennings 9/19/16 Instructor Date Validated By: Matt Baker 10/27/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM431_R2 Facility Approved.doc Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ a) Task description and number, JPM description and number are identified.

________ b) Knowledge and Abilities (K/A) references are included.

________ c) Performance location specified. (in-plant, control room, simulator, or other)

________ d) Initial setup conditions are identified.

________ e) Initiating cue (and terminating cue if required) are properly identified.

________ f) Task standards identified and verified by SME review.

________ g) Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ h) Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 3404.01 Rev: 13e Procedure Rev:

Procedure Rev:

________ i) Verify cues both verbal and visual are free of conflict.

________ j) Verify performance time is accurate

________ k) If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ l) When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 13

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 7/28/10 New JPM.

01 6/14/14 Updated to new JPM template and updated procedure revisions.

02 9/19/16 Updated procedure references.

Page 3 of 13

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. This is an in-plant JPM and requires no simulator setup..

Page 4 of 13

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • The Fuel Building HVAC system is in operation IAW CPS No. 3404.01 Fuel Building HVAC (VF)

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 340401, Rev 13e FUEL BUILDING HVAC (VF)

EVALUATOR INSTRUCTIONS:

  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page) of the JPM) when providing the initiating cue.
  • Provide the examinee with a copy of CPS 3404.01 Fuel Building HVAC (VF) when providing the initiating cue.
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

Page 5 of 13

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A condition exists which requires Emergency Venting of the Containment.

VF System is shutdown IAW CPS 3404.01 FUEL BUILDING HVAC (VF) section 8.3 Shutdown.

The Standby Gas Treatment System (VG) is shut down.

EOP checklist CPS No. 4410.00C011, DEFEATING LOW RPV WATER LEVEL AND HIGH DRYWELL PRESSURE FUEL BUILDING VENTILATION ISOLATIONS, has been completed.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

The CRS has directed you to restart the Fuel Building HVAC system to support the venting process per the normal startup section of CPS 3404.01 FUEL BUILDING HVAC (VF), section 8.1.7.

MCR actions per steps 8.1.1 through 8.1.6 are complete.

Report to the CRS after completing the task.

START TIME:

Page 6 of 13

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 3404.01 FUEL BUILDING HVAC (VF)

  • 8.1.7.1 For all available Exhaust/Supply fan(s):

a) Place 1VF04CA, Exhaust Fan H/S [1HS-VF005] to AFTER-STOP.

b) Place 1VF04CB, Exhaust Fan H/S [1HS-VF006] to AFTER-STOP.

c) Place 1VF03CA, Supply Fan H/S [1HS-VF002] to AFTER-STOP.

d) Place 1VF03CB, Supply Fan H/S [1HS-VF003] to AFTER-STOP.

Standard: Examinee locates the control switches for 1VF04CA, 4CB, 3CA, and 3CB at 1PL44J and simulates taking each control switch out of PTL and into AFTER-STOP.

Cue: The components are in the position youve described.

Comments SAT £ UNSAT £ Comment Number Page 7 of 13

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)

  • 8.1.7.2 Start 1VF04CA(CB), Exhaust Fan [1HS-VF005(006)].

Observe the following:

a) 1VF11YA(YB), Exh Fan Disch Dmpr opens.

b) Fuel Bldg Average Pressure (1PDI-VF035B) begins to go negative.

Standard: Examinee locates control switches for 1VF04CA or 1VF04CB, simulates turning the respective control switch 1HS-VF005 or 1HS-VF006 clockwise to the START position and then releases.

Examinee verifies the following:

  • 1VF04CA(B) RED light ON and GREEN light OFF.
  • 1VF11YA(YB) RED light ON and GREEN light OFF.

Cue: If the examinee asks which set of supply and/or exhaust fans to start, cue him/her that the MCR has no preference on which fans are started.

When the exhaust fan is started, cue the indicator needle (with an ink pen or similar device) on 1PDI-VF035B trending slowly in the negative direction.

Cue the examinee that components and indications are as youve described.

Comments If checked INITIALLY, 1PDI-VF035B reads 0 inches water.

SAT £ UNSAT £ Comment Number Page 8 of 13

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)

  • 8.1.7.3 WHEN Fuel Bldg Average Pressure reaches -0.5 H2O, THEN Start 1VF03CA(CB), Supply Fan [1HS-VF002(003)].

Observe the following:

a) 1VF02YA(YB), Supply Fan Disch Dmpr opens.

b) 1VF01Y, Supply Fan Intake Dmpr opens.

c) Fuel Bldg Average Pressure steadies out at ~ -0.7 inches water (1PDI-VF035B)

Standard: Examinee locates control switches for 1VF03CA or 1VF03CB, simulates turning the respective control switch 1HS-VF002 or 1HS-VF003 clockwise to the START position and then releases.

Examinee verifies the following:

  • 1VF03CA(B) RED light ON and GREEN light OFF.
  • 1VF02YA(YB) RED light ON and GREEN light OFF.
  • Verifies 1VF01Y RED light ON and GREEN light OFF.

Cue: After the VF supply fan has been started, cue the indicator needle on 1PDI-VF035B trending slowly in the negative direction and then steadying out at ~ -0.7 inches water.

Cue the examinee that components and indications are as youve described.

Comments SAT £ UNSAT £ Comment Number Page 9 of 13

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM) 8.1.7.4 4) IF Needed to maintain building temperature, THEN Place Heater, 1VF02A, H/S to ON (1HS-VF028).

Standard: No action required.

Cue: If examinee asks whether to energize heater 1VF02A, respond as MCR Do NOT start building heater.

Comments SAT £ UNSAT £ Comment Number 8.1.8 Place/verify 1RIX-PR019, Fuel Bldg CAM (EOP-8 Monitor) in NORMAL per CPS 3315.03, Radiation Monitoring (AR/PR).

Standard: No action required (MCR Action).

Cue: May contact RP or MCR to perform this action.

Comments SAT £ UNSAT £ Comment Number 8.1.9 Following system stabilization, position supply and exhaust fan switches to agree with running and standby status of the respective fan(s) (red flag/green flag).

Standard: No action required; switch positions should be in agreement with the running and standby status of each fan.

Cue:

Comments SAT £ UNSAT £ Comment Number Page 10 of 13

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)

TERMINATING CUES:

Fuel Building HVAC is in service IAW CPS No. 3404.01 FUEL BUILDING HVAC (VF).

STOP TIME:

Page 11 of 13

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Startup the Fuel Building HVAC VF System to support Emergency Containment Venting JPM Number: JPM431 Revision Number: 02 Task Number and

Title:

340401.01 Start up of the VF system.

K/A System K/A Number Importance (RO/SRO) 288000 A2.03 3.5 3.7 Ability to (a) predict the impacts of the following on the PLANT VENTILATION SYSTEMS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of coolant accident: Plant-Specific Suggested Testing Environment: Plant Actual Testing Environment: £ Simulator ¢ Plant £ Control Room Testing Method: ¢ Simulate Alternate Path: £ Yes ¢ No

£ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

CPS No. 3404.01, Rev 13e FUEL BUILDING HVAC (VF)

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 12 of 13

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A condition exists which requires Emergency Venting of the Containment.

VF System is shutdown IAW CPS 3404.01 FUEL BUILDING HVAC (VF) section 8.3 Shutdown.

The Standby Gas Treatment System (VG) is shut down.

EOP checklist CPS No. 4410.00C011, DEFEATING LOW RPV WATER LEVEL AND HIGH DRYWELL PRESSURE FUEL BUILDING VENTILATION ISOLATIONS, has been completed.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

The CRS has directed you to restart the Fuel Building HVAC system to support the venting process per the normal startup section of CPS 3404.01 FUEL BUILDING HVAC (VF), section 8.1.7.

MCR actions per steps 8.1.1 through 8.1.6 are complete.

Report to the CRS after completing the task.

Page 13 of 13

ILT 15-1 NRC Exam Scenario 1 Rev. 0 Exelon Nuclear ILT 15-1 NRC Exam Scenario Number:

NRC Exam Scenario 1 Revision Number: 0 Date: 10/28/16 Developed By: T. Jennings 10/28/16 Instructor Date Validated By: Michael Antonelli 10/28/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 1 of 19

ILT 15-1 NRC Exam Scenario 1 Rev. 0 Appendix D Scenario Outline Form ES-D-1 Facility: Clinton Power Station Scenario No.: 1 Operating Test No.: 2017-301 Examiners: ____________________________ Operators: ____________________

Initial Conditions:

  • Thunderstorms are expected in the area within the next hour.
  • CY Pump B (0CY01PB) is OOS for maintenance. Not expected back this shift.
  • CPS 9080.03 DG 1C Operability - Manual and Quick Start Operability is in progress. DG 1C is running in parallel with RAT B.

Turnover:

  • Priorities for the shift are as follows:
  • Secure Division 3 Diesel Generator (DG 1C) per CPS 9080.03 DG 1C Operability - Manual and Quick Start Operability, starting at step 8.2.16 - First Priority. CPS 9082.01 Offsite Source Power Verification was completed one (1) hour ago.
  • Maintain power at 78% throughout the shift.

Event Malf. No. Event Event No. Type* Description 1 N/A N-BOP Secure DG 1C 2 YP_XMFTB_3986 TS-SRO DG 1C Overspeeds When Unloaded A05_A02_A104_3_TVM A05_A02_A105_3_TVM A05_A02_A106_3_TVM 3 A02_A05_01_7_TVM=2 C-ATC CRD high temperature 4 CAM0PR001IA_PUMP to 1 C-BOP Failure of 0RIX-PR001 Ch 15 - Low flow due TS-SRO to sample pump failure CAM0PR001TV_VALUE15 to 0 5 A01_A02_01_8_TVM C-ATC Clogged oil filter Condensate Booster Pump A

6 YPXMALSE_77 to 50 C-BOP Inadvertent opening of a SRV 7 YFFWPPSS_11 R-ATC Loss of CY - Rapid Plant Shutdown YAFWPPDE_9 8 RAT_B_OVERCURRENT M-All LOCA/RAT trip/E51-F013 Failure/Div 3 ERAT YARIMVFP_2 = 0 Feed Breaker Failure/TAF Blowdown ED17B221C1FO YPXMALSE_511 9 LPCS Fails To Auto Start YP_XMFTB_4106 C-BOP LPCS Injection Valve 1E21F005 Fails to Auto lp11acld001fsp=True Open at 472 psig RPV pressure

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 2 of 19

ILT 15-1 NRC Exam Scenario 1 Rev. 0 Appendix D Scenario Outline Form ES-D-1 Scenario No.: 1 Operating Test No.: 2017-301 Narrative Summary Event # Description

1. Secure DG 1C Division 3 DG is running in parallel with RAT B IAW CPS 9080.03, Diesel Generator 1C Operability -

Manual and Quick Start Operability. Following shift turnover, the SRO will direct the BOP operator to unload and secure DG 1C and place it back in standby.

2. DG 1C Overspeeds When Unloaded When the BOP opens the output breaker for DG 1C in event 1, annunciators 5062-2C TRIP/LOCKOUT DIESEL GEN 1C, 5062-4C OVERSPEED DIESEL GEN 1C, 5062-5C TRIPPED DIESEL GEN 1C ENGINE and 5062-6C TROUBLE DIESEL GEN 1C come in due to an overspeed trip of the Div 3 DG.

The overspeed trip will result in a lockout of the Div 3 DG, rendering the DG inoperable and unavailable.

The field operator stationed in the Div 3 DG Room will confirm MCR indications. Technical Specification 3.8.1 Condition B (one required DG inoperable) will be entered and appropriate actions taken.

3. CRD high temperature Annunciator 5006-1G CRD HYDR TEMP HI is received. The ATC operator will dispatch a field operator to the local recorder on 1H22-P007 to determine rod 52-25 is alarming. The ATC operator will note that rod 52-25 is currently at position 48 and IAW CPS 3304.01 Control Rod Hydraulic & Control (RD) perform an extended coupling check. The annunciator will clear for ~ 30 seconds and then alarm again. The ATC operator will then insert rod 52-25 to position 46 which will clear the high temperature condition.
4. Failure of 0RIX-PR001 Ch 15 - Low flow due to sample pump failure A channel (15) trouble - flow out of limit is received on the MCR AR/PR LAN for 0RIX-PR001 HVAC Exhaust Stack PRM #1. The BOP will identify a low flow condition. The SRO will declare 0RIX-PR001 inoperable and enter ODCM 3.2.2 Conditions A and C. The SRO will direct the BOP to place 0RIX-PR002 in service and exit ODCM actions.
5. Clogged Oil Filter Condensate Booster Pump A Annunciator 5001-1H CLOGGED OIL FILTER CB PUMP 1A will be received. An Equipment Operator will be dispatched to turn the CUNO filter handle several times in an attempt to clear the alarm, but will be unsuccessful. The SRO will direct the ATC to start a non-running Condensate Booster Pump and secure CB Pump 1A per CPS 3104.01 Condensate/Condensate Booster (CD/CB), section 8.2.2 Starting Additional/Shifting Condensate Booster Pumps.
6. Inadvertent opening of a SRV Annunciators 5066-5B ADS OR SAFETY RELIEF VALVE LEAKING and 5067-8L SRV MONITORING SYSTEM TROUBLE come in due to SRV 1B21-F041G failing ~ 50 % open. The BOP operator will diagnose and determine the problem is with 1B21-F041G. The SRO will direct the BOP operator to sound the containment evacuation alarm and coordinate with the ATC and attempt to close the SRV IAW CPS 4009.01 Inadvertent Opening Safety/Relief Valve. The SRO will enter and execute CPS 4005.01 Loss of Feedwater Heating and direct the ATC to restore and maintain reactor power at or below the original power level. SRV 1B21-F041G will shut when the first fuse is simulated removed for the associated A solenoid at 1H13-P661.
7. Loss of CY - Rapid Plant Shutdown The scenario starts with the B CY Pump out of service. In this event the shaft shears on the running CY Pump (0CY01PC). The BOP operator will start the A CY Pump and secure the C CY Pump. However, the A CY pump capacity begins to degrade and annunciator 5014-2B Low Press Cycle Cond Xfer Pump Disch Hdr will be received. Due to the complete loss of CY system pumps, the crew will perform a Rapid Plant Shutdown and attempt to scram the reactor per CPS 3208.01 Cycled / Makeup Condensate (CY/MC).

ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 3 of 19

ILT 15-1 NRC Exam Scenario 1 Rev. 0 Narrative Summary (cont.)

Event # Description

8. LOCA/RAT Trip/E51-F013 Failure/Div 3 ERAT Feed Breaker Failure/TAF Blowdown When the unit is scrammed in event 7, the Main Generator will trip on reverse power (normal post-scram response). When Generator Output Gas Circuit Breaker (GCB) 4506 opens, a lockout of RAT B results in a loss of non-vital 4160 and 6900 volt power, resulting in a loss of Feedwater and Control Rod Drive as injection sources. Additionally, the ERAT Feed Breaker to 4160V Bus 1C1 fails to close, resulting in de-energization of 4160V Bus 1C1 resulting in loss of HPCS as a feed source, and the RCIC injection valve will fail to open remotely and manually. This will complete the loss of all high pressure feed sources to the RPV. A LOCA will then commence, resulting in a loss of RPV inventory and causing DW pressure to increase. The LOCA will escalate, causing RPV level to fall to TAF, requiring an emergency depressurization to be performed (ADS fails to automatically initiate).
9. LPCS Fails To Auto Start / LPCS Injection Valve 1E21F005 Fails to Auto Open at 472 psig RPV pressure The Low Pressure Core Spray Pump will fail to auto start when DW pressure reaches 1.68 psig and will have to be manually started (critical task). In addition, 1E21-F005 LPCS Injection Valve will fail to automatically open at 472 psig RPV pressure, requiring the injection valve to be manually opened to recover RPV level above TAF.

EOP 1, 3, 6 Critical tasks:

  • RPV-1.2 Maximize injection to restore water level above -162 (TAF). For this scenario, the magnitude of the leak is such that RPV water level will not recover above TAF if LPCS is not manually initiated within 17.5 minutes of RPV level reaching -145.5 inches.

ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 4 of 19

ILT 15-1 NRC Exam Scenario 1 Rev. 0 Operator Actions Event No.(s): 1 Page 1 of 1

==

Description:==

Secure DG 1C Initiation: Following shift turnover and when directed by the Lead Examiner Cues: Directed by SRO Time Position Applicants Actions or Behavior General Note on Requirements for Expected Annunciator Response - OP-AA-103-102 If this evolution was pre-briefed and Expected Alarms were reviewed, the following expectations apply:

  • Expected alarms will be flagged
  • When the annunciator comes in the operator will announce Expected Alarm
  • The annunciator response procedure (ARP) need not be entered since it has already been reviewed in the pre-brief.

If a pre-brief was not conducted the operator should perform the following:

  • The annunciator may then be identified as an Expected Alarm, flagged, and from that point on the ARP need not be referred to.

Key Parameter Response: None Expected Annunciators: None Automatic Actions: None ATC

  • Monitors reactor to ensure operations remain within established bands.

o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

BOP o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

Per CPS 9080.03, performs steps 8.2.16.2 - 8.2.16.4 to unload and secure DG 1C from surveillance (DG 1C will trip when the output breaker is opened in step 8.2.16.4):

  • Slowly lowers DG 1C load to 100-200 KW using the DG 1C Governor Control Switch.

o Adjusts DG 1C VARs to ~ 0 KVAR using the DG 1C Voltage Regulator Control Switch.

SRO

  • Directs actions listed above.
  • Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.

Terminus: DG 1C unloaded and tripped.

NOTES:

  • Solid bullets are required actions o Hollow bullets are actions that may or may not be performed ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 5 of 19

ILT 15-1 NRC Exam Scenario 1 Rev. 0 Operator Actions Event No.(s): 2 Page 1 of 1

==

Description:==

DG 1C Overspeeds When Unloaded Initiation: When DG 1C Output Breaker is opened in Event 1.

Cues: Annunciators 5062-2C TRIP/LOCKOUT DIESEL GEN 1C, 5062-4C OVERSPEED DIESEL GEN 1C, 5062-5C TRIPPED DIESEL GEN 1C ENGINE, 5062-6C TROUBLE DIESEL GEN 1C Time Position Applicants Actions or Behavior Key Parameter Response: None Expected Annunciators: 5062-2C, 5062-4C, 5062-5C, 5062-6C Automatic Actions: None ATC

  • Monitors reactor to ensure operations remain within established bands.

o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

o Dispatches Equipment Operator to investigate.

BOP

  • Refers to ARPs for 5062-2C, 4C, 5C, and 6C.

o Informs SRO to refer to CPS 4200.01 Loss of AC Power.

o Informs SRO to refer to ITS 3.8.1, 3.8.2, and 3.8.3.

o Informs SRO of possible need to notify Ameren of Div 3 DG UNAVAILABILITY.

o Dispatches Equipment Operator to investigate.

  • Acknowledges reports from ATC/BOP.

SRO

  • Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.

o Enters and executes CPS 4200.01 Loss of AC Power.

  • Evaluates and enters ITS 3.8.1 AC Sources - Operating, Condition B Required Actions B.1, B.2, B.3.1 (or B.3.2), and B.4.

o Informs Shift Manager.

o Contacts Maintenance to investigate.

o Conducts a brief.

Terminus: ITS 3.8.1 evaluated.

NOTES:

ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 6 of 19

ILT 15-1 NRC Exam Scenario 1 Rev. 0 Operator Actions Event No.(s): 3 Page 1 of 1

==

Description:==

CRD high temperature Initiation: Following Event 2 and upon direction of the Lead Examiner, insert REMOTE 1.

Cues: Annunciator 5006-1G, CRD Hydr Temp Hi Time Position Applicants Actions or Behavior Key Parameter Response: CRD 52-25 operating temperature Expected Annunciators: 5006-1G, CRD Hydr Temp Hi Automatic Actions: None ATC

  • Reports issue to SRO.

o Directs Field Operator to investigate.

  • Monitors reactor to ensure operations remain within established bands.

Per 3304.01, Control Rod Hydraulic & Control (RD):

BOP

  • Monitors control room panels and notifies the SRO of any unusual or unexpected conditions.

o Initiates an Issue Report and contacts the Reactor Engineer regarding the uncoupled rod event.

SRO

  • Acknowledges report from ATC.
  • Directs actions listed above.
  • Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.

o Informs Shift Manager.

o Contacts Maintenance to investigate.

o Conducts a brief.

Terminus: Control rod 52-25 inserted to position 46. Annunciator 5006-1G clear NOTES:

ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 7 of 19

ILT 15-1 NRC Exam Scenario 1 Rev. 0 Operator Actions Event No.(s): 4 Page 1 of 1

==

Description:==

Failure of 0RIX-PR001 Ch 15 - Low flow due to sample pump failure Initiation: Following Event 3 and upon direction of the Lead Examiner, insert REMOTE 2 Cues: MCR AR/PR LAN Alarm Time Position Applicants Actions or Behavior Key Parameter Response: 0RIX-PR001 Channel 15 Flow Expected Annunciators: None Automatic Actions: None ATC

  • Monitors reactor to ensure operations remain within established bands o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

BOP

  • Reports issue to SRO.
  • Refers to the ARP.

o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

Per CPS 3315.03, Radiation Monitoring section 8.4, places 0RIX-PR002 in service :

o Directs Chemistry to perform CY-CL-6954-01, HVAC Stack Effluent-Iodine and Particulate.

o At Channel Status screen for monitor 0RIX-PR002 ;

  • Starts the pump by selecting ON under Pump Command.
  • Verifies Channel 14 pressure is indicating < 14.9 psia AND is not DELETED.
  • Observes sample flow (Ch 15) stabilizes (53-57 LPM).
  • Places 0RIX-PR002 in Normal by selecting NRML under Stdby Cmnd.

o At Channel Status screen for monitor to be placed in STANDBY (0RIX-PR001):

  • Places monitor in STANDBY by selecting STBY under Stdby Cmnd.

o Resets/verifies reset all alarms for 0RIX-PR002.

  • Performs a channel check of monitor 0RIX-PR002 per CPS 9000.01, Control Room Surveillance Log.

SRO

  • Acknowledge reports from BOP.
  • Directs actions listed above.
  • Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
  • Enters ODCM 3.2.2 Required Actions A.1, C.1, C.2.2.1, C2.2.2, D.1, and D.2.

o Contacts Maintenance to investigate.

o Informs Shift Manager.

o Conducts a brief.

Terminus: 0RIX-PR001 secured, 0RIX-PR002 started, tech specs evaluated.

NOTES:

ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 8 of 19

ILT 15-1 NRC Exam Scenario 1 Rev. 0 Operator Actions Event No.(s): 5 Page 1 of 1

==

Description:==

Clogged oil filter Condensate Booster (CB) Pump A Initiation: Following Event 4 and upon direction of the Lead Examiner, insert REMOTE 3 Cues: Annunciator 5001-1H Clogged Oil Filter CB Pump 1A Time Position Applicants Actions or Behavior Key Parameter Response:

Expected Annunciators: 5001-1H Clogged Oil Filter CB Pump 1A Automatic Actions: None ATC

  • Monitors reactor to ensure operations remain within established bands o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.
  • Reports issue to SRO.

Per CPS 5001-1H, Clogged Oil Filter Condensate Booster Pump 1A:

o Directs Equipment Operator to turn CUNO filter handle several turns for the 1A CB Pump.

Per ARP or CPS 3104.01, Condensate/Condensate Booster (CD/CB) step 8.2.2:

  • Starts CB Pump 1C.
  • Secures CB Pump 1A.

BOP

  • Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

o Monitors reactor to ensure operations remain within established bands o Directs Equipment Operator to turn CUNO filter handle several turns for the 1A CB Pump.

SRO

  • Acknowledges reports from ATC/BOP.
  • Directs actions listed above.
  • Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.

o Informs Shift Manager.

o Conducts a brief.

o Contacts Maintenance to investigate.

Terminus: CB Pumps shifted.

NOTES:

ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 9 of 19

ILT 15-1 NRC Exam Scenario 1 Rev. 0 Operator Actions Event No.(s): 6 Page 1 of 1

==

Description:==

Inadvertent opening of a SRV Initiation: Following Event 5 and upon direction of the Lead Examiner, insert REMOTE 4 Cues: Annunciators 5067-8L, SRV Monitoring System Trouble and 5066-5B, ADS Or Safety Relief Valve Lifting Time Position Applicants Actions or Behavior Key Parameter Response: Reactor Power, RPV Level Expected Annunciators: 5067-8L, SRV Monitoring System Trouble and 5066-5B, ADS Or Safety Relief Valve Lifting Automatic Actions: None ATC o Reports issue to SRO.

  • Monitors reactor to ensure operations remain within established bands.

o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

Per CPS 4005.01 Loss Of Feedwater Heating

  • Reduces RR flow with FCV(s) to restore and maintain power at or below the original power level.

BOP o Reports issue to SRO.

o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

Per CPS 4009.01 Inadvertent Opening Safety/Relief Valves:

  • Sounds the containment evacuation alarm.
  • (Attempts) to SHUT open SRV (F041G) by placing control switch to OPEN, and then back to OFF (from 1H13-P601 or P642 control switches as necessary).
  • Removes fuses for the A and B solenoids (for F041G) at panels 1H13-P661/P662, using Table 1 for fuse location.

SRO

  • Acknowledges report from ATC/BOP.
  • Directs actions listed above.
  • Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
  • Enters CPS 4009.01 Inadvertent Opening Safety/Relief Valves and CPS 4005.01 Loss Of Feedwater Heating.

o May review ITS 3.4.4 Safety/Relief Valves (S/RVs) and verify entry conditions are NOT met.

o Informs Shift Manager.

o Conducts a brief.

Terminus: SRV F041G is SHUT NOTES:

ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 10 of 19

ILT 15-1 NRC Exam Scenario 1 Rev. 0 Operator Actions Event No.(s): 7 Page 1 of 1

==

Description:==

Loss of CY - Rapid Plant Shutdown Initiation: Following Event 6 and upon direction of the Lead Examiner, insert REMOTE 5 Cues: Annunciator CPS 5014-2B Low Press Cycle Cond Xfer Pump Disch Hdr Time Position Applicants Actions or Behavior Key Parameter Response: None Expected Annunciators: CPS 5014-2D, Low Press Cycled Cond Xfer Pumps Disch Hdr Automatic Actions: None o For the Rapid Plant Shutdown, evacuates the containment and makes a plant ATC announcement, Performing a Rapid Plant Shutdown due to loss of CY Pumps.

  • When directed by the SRO, performs a Rapid Plant Shutdown IAW CPS 3005.01 Unit Power Changes by lowering core flow using RR FCVs until core flow is ~ 43 mlbm/hr.
  • Places the mode switch in SHUTDOWN and carries out Scram Choreography by reporting:
  • Rod status is
  • Reactor Power is and trend
  • Reactor pressure is and trend
  • Reactor level is and trend
  • Any EOPs with entry conditions (no values required).

o Stops all running condensate pumps 1CD01PA (B) (C) (D).

  • Performs EOP actions as directed by SRO.

BOP

  • Reports annunciator 5014-2D Low Press Cycled Cond Xfer Pumps Disch Hdr to the SRO.
  • Refers to the ARP for 5014-2D.

Per CPS 5014-2D, Low Press Cycled Cond Xfer Pumps Disch Hdr:

  • Operates CY transfer pumps consistent with system demand to maintain normal header pressure per CPS 3208.01, Cycled/Makeup Condensate (CY/MC) o Operator may go to CPS 3208.01 Section 8.2.2 directly or to 8.3.1 which will then direct him/her to section 8.2.2.

Per CPS 3208.01, Cycled/Makeup Condensate (CY/MC):

  • Starts the A CY Pump:
  • Observes an increase in Cyc Cond Xfer Pmp Disch Hdr Pressure followed by a decrease in Cyc Cond Xfer Pmp Disch Hdr Pressure on 1H13-P870-5014.
  • Reports annunciator 5014-2D Low Press Cycled Cond Xfer Pumps Disch Hdr has been received again.
  • Reports loss of CY to the SRO.

o For the Rapid Plant Shutdown, evacuates the containment and makes a plant announcement, Performing a Rapid Plant Shutdown due to loss of CY Pumps.

  • Carries out Scram Choreography by reporting:
  • Evacuate the RCIC room
  • Evacuate the Containment
  • Determines rod status and reports it to the SRO
  • Performs EOP actions as directed by SRO.
  • Acknowledges reports from ATC/BOP.

SRO

  • Ensures operations are conducted within the bounds of Tech Specs and IAW Operations standards and approved procedures.
  • Per CPS 3005.01 Unit Power Changes, directs ATC to perform a Rapid Plant Shutdown or Reactor Scram when it has been determined that CY has been lost.

o Directs ATC to stop all running condensate pumps 1CD01PA (B) (C) (D)

ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 11 of 19

ILT 15-1 NRC Exam Scenario 1 Rev. 0

  • Enters and executes CPS 4100.01 Reactor Scram.
  • Carries out Scram Choreography by performing an Update:
  • Update:
  • Entering the Scram Off-Normal
  • End of Update Terminus: Reactor has been scrammed and scram actions are in progress.

NOTES:

ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 12 of 19

ILT 15-1 NRC Exam Scenario 1 Rev. 0 Operator Actions Event No.(s): 8, 9 Page 1 of 2

==

Description:==

LOCA/RAT trip/E51-F013 Failure/Div 3 ERAT Feed Breaker Failure/TAF Blowdown/LPCS Fails to Auto Start Initiation: Triggered by the Main Generator trip in Event 7.

Cues: Multiple annunciators on 1H13-P680, 1H13-P870, and 1H13-P601, rising DW pressure and temperature indications Time Position Applicants Actions or Behavior Key Parameter Response: Rising DW temperature and pressure, loss of 4160 and 6900 V Non-vital busses.

Expected Annunciators: Multiple annunciators on 1H13-P680, 1H13-P870, and 1H13-P601 Automatic Actions: ECCS systems and DGs start on high DW pressure (1.68 psig)

ATC o Reports trip of the RAT transformers/loss of non-vital AC power.

o Reports that the RCIC Injection valve failed to open remotely and manually.Performs EOP actions as directed by SRO.

  • Performs EOP actions as directed by SRO.

o Reports that the LPCS Pump failed to automatically start and manually starts the pump.

o Coordinates with BOP operator to monitor and control RPV level and pressure.

o Reports failure of ADS to automatically initiate when RPV level reaches Level 1 (-145.5).

Per EOP-3, Emergency RPV Depressurization (may be performed by BOP):

[CT]

o When TAF (-160 inches) is reached, initiates ADS to Blowdown the reactor within 17.5 minutes after RPV level reaches -145.5 (Level 1) when directed by the SRO.

[CT]

o Maximizes ECCS injection (including starting LPCS Pump) to restore RPV water level above TAF within 17.5 minutes after RPV level reaches -145.5 (Level 1).

BOP o Reports trip of the RAT transformers/loss of non-vital AC power.

o Performs a manual Group 1 Isolation.

o Reports that the RCIC Injection valve failed to open remotely and manually.

  • Performs EOP actions as directed by SRO.

o Reports that the LPCS Pump failed to automatically start and manually starts the pump.

o Reports failure of ADS to automatically initiate when RPV level reaches Level 1 (-145.5).

Per EOP-3, Emergency RPV Depressurization (may be performed by BOP):

[CT] o When TAF (-160 inches) is reached, initiates ADS to Blowdown the reactor within 17.5 minutes after RPV level reaches -145.5 (Level 1) when directed by the SRO.

[CT] o Maximizes ECCS injection (including starting LPCS Pump and opening 1E12-F005) to restore RPV water level above TAF within 17.5 minutes after RPV level reaches -

145.5 (Level 1).

  • Verifies ADS actuation using the following indications:

o SPDS o DCS Display 122 (2H) [Acoustic Monitor Input]

o DCS Display 186 (7B) [A Solenoid Input]

o 1H13-P601/P642 Solenoid Indicator Lights o 1H13-P866, Valve Flow Monitor Control Panel o 1H13-P614, ADS Safety Valve Temperature recorder 1B21-R614 o Indirect indication via changes in RPV pressure, RPV level, MSL flows &

suppression pool temperatures.

ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 13 of 19

ILT 15-1 NRC Exam Scenario 1 Rev. 0 Event No.(s): 8, 9 Page 2 of 2 SRO

  • Acknowledges reports from ATC/BOP.
  • Directs actions listed above.
  • Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
  • Enters and executes the following off-normal procedures:
  • CPS 4001.02 Automatic Isolation
  • Enters and executes EOP-3 Emergency RPV Depressurization (Blowdown) when RPV Level reaches TAF.
  • When TAF (-160 inches) is reached, directs:

[CT]

  • initiating ADS to Blowdown the reactor within 17.5 minutes after RPV level reaches -145.5 (Level 1).

[CT]

  • maximizing ECCS injection (including starting LPCS Pump and opening 1E12-F005) to restore RPV water level above TAF within 17.5 minutes after RPV level reaches -145.5 (Level 1).

Terminus: The scenario can be terminated when a blowdown has been initiated and RPV level has being raised above TAF.

NOTES:

ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 14 of 19

ILT 15-1 NRC Exam Scenario 1 Rev. 0 Simulator Operator Instructions Initial Setup

1. Fill out plant status and have Turnover Sheet ready for the crew.
2. Verify daily lamp test completed.
3. Reset to IC-221 (PW 76319) @ 78% Power. If this is the first reset after swapping simulator loads, reset the IC twice.
4. Load the lesson plan for this scenario.
5. Verify the following commands are active:
  • A05_A02_A0508 TVM 5066-8A ADS B Out of Service (OFF)
  • A05_A02_A0608 TVM 5067-8A ADS A Out of Service (OFF)
  • A05_A02_A13DS47_1 ADS A&E Inhibit Wht Light (OFF)
  • A05_A02_A13DS48_1 ADS B&F Inhibit Wht Light (OFF)
  • A05_A02_A13S63 ADS A&E Inhibit PB (Inhibited)
  • A05_A02_A13S64 ADS B&F Inhibit PB (Inhibited)
  • YARIMVFP_2 E51F013 (immediate) Fail-To Position (FV = 0)
  • YP_XMFTB_4106 LPCS Fail to Auto Start
  • lp11acld001fsp=True (LPCS Injection Valve Auto Open Failure)
6. Place simulator in RUN.
7. Turn on and advance recorders.
8. Verify RCIC Flow Controller is set at 620 gpm.
9. Verify the AR/PR server is running and stabilize AR/PR.
10. Verify Rod Drive pressure is in the expected range of 235-265 psid.
11. Provide pull sheets: Step 29 is in progress - Gang 10A is at Position 10.
12. Make sure Sequence A is selected.
13. Make sure Individual Drive Mode is selected on the OCM.
14. Remove EST Tags from the following control switches:
15. Procedures that are expected to be used during this scenario are:
  • CPS 9080.03 DG 1C Operability - Manual and Quick Start Operability (provided in the Crew Docs binders)
  • CPS 4200.01 Loss of AC Power
  • ITS 3.8.1 AC Sources - Operating
  • CPS 3304.02 Rod Control and Information System (RC&IS)

ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 15 of 19

ILT 15-1 NRC Exam Scenario 1 Rev. 0

  • CPS 3315.03 Radiation Monitoring (AR/PR)
  • ODCM 3.9.2 Radioactive Gaseous Effluent Monitoring Instrumentation
  • CPS 3104.01 Condensate/Condensate Booster (CD/CB)
  • CPS 4009.01 Inadvertent Opening Safety/Relief Valves
  • ITS 3.4.4 Safety/Relief Valves (S/RVs)
  • CPS 3208.01 Cycled/Makeup Condensate (CY/MC)
  • CPS 4001.02 Automatic Isolation
16. Hang OOS tags on: CY Pump B (0CY01PB)
17. Identify T/S issues associated with OOS and turnover: ITS 3.8.1 AC Sources - Operating, Condition B (with Division 3 DG speed droop set to 50%).
18. Operating Equipment: None
19. Marked up copies: CPS 9080.03 (all step up to and including 8.2.16.1)
20. Verify simulator conditions match the turnover.

ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 16 of 19

ILT 15-1 NRC Exam Scenario 1 Rev. 0 Event Triggers and Role Play Event #

1. Secure DG 1C
a. Event Trigger - None
b. Role Play - Field Operator: If the BOP reports commencing to unload DG 1C, acknowledge the report.
2. DG 1C Overspeeds When Unloaded
a. Event Trigger - None
b. Role Play - Field Operator: If requested to report local panel 1E22-S001B status following the DG 1C trip, report the following:

(1) Annunciator 5286-1B Overspeed locked in (2) Annunciator 5286-2C Engine Tripped locked in (3) Both DG 1C 86 lockout relays tripped

3. CRD high temperature
a. Event Trigger - Following Event 2 and when directed by the Lead Examiner, Activate Remote 1 and verify the following command(s):

(1) A02_A05_01_7_TVM=2 (Annunciator 5006-1G CRD Hydr Temp Hi).

b. Role play:

(1) Field Operator (if requested):

a) Report, CRD 52-25 is alarming at 255°F and trending up at 1°F every five minutes. All other CRD temperatures appear to be normal b) After rod 52-25 has been repositioned to position 46, report CRD 52-25 temperature is ~ 240°F and slowly lowering.

4. Failure of 0RIX-PR001 Ch 15 - Low flow due to sample pump failure
a. Event Trigger - Following Event 3 and when directed by the Lead Examiner, Activate Remote 2 and verify the following command(s):

(1) CAM0PR001IA_PUMP to 1. (PR001 Sample Pump Status)

(2) CAM0PR001TV_VALUE15 to 0. (PR001 Ch 15 input)

b. Role play (1) Field Operator/Chemistry (if directed to check the status of the sample pump for 0RIX-PR001A) - The pump is not running. No other abnormalities exist locally at the PRM.
5. Clogged oil filter Condensate Booster Pump A
a. Event Trigger - When directed by the Lead Examiner, Activate Remote 3 and verify the following command(s):

(1) A01_A02_01_8_TVM Steady

b. Role play (1) Field Operator (If requested):

a) (when directed to turn the handle on the CB 1A CUNO Filter) - acknowledge request. Wait ~ one minute and report I turned the handle on Condensate Booster Pump 1A CUNO Filter several times".

b) (if asked for CB Pump A oil pressure) - report 13 psig and slowly lowering.

c) (when directed to perform startup checks for the standby CB pump) - report Pre-starts are complete".

d) (when directed for local indications during prestart checks) - report Lube oil pressure is > 8 psi and lube oil temperature is >75°F".

e) (when asked if CB Pump C is operating normally locally) - report CB Pump C is running normally.

ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 17 of 19

ILT 15-1 NRC Exam Scenario 1 Rev. 0

6. Inadvertent opening of a SRV
a. Event Trigger - Following Event 5 and when directed by the Lead Examiner, Activate Remote 4 and verify the following command(s):

(1) YPXMALSE_77 to 50 (F041G MS Relief Failure)

b. Role play (1) Booth Operator (if requested by BOP and not performed at the V-Panel):

a) cycle the Div 2 CS for SRV 41G to Open and then Off - Release 41G P642 CS to Open / Off (YP_HP101_7 Open and YP_HP101_7 Off) b) remove fuses for F041G A Solenoid - Release 41G A Fuse Removed (YP_XREMT_371 = OFF) c) remove fuses for F041G B Solenoid - Release 41G B Fuse Removed (YP_XREMT_387 = OFF)

7. Loss of CY - Rapid Plant Shutdown
a. Event Trigger - Following Event 6 and when directed by the Lead Examiner, Activate Remote 5 and verify the following command(s):

(1) YFFWPPSS_11. (CY Pump C Shaft Shear)

(2) YAFWPPDE_9. (CY Pump A Pumping Efficiency)

b. Role play (1) Field Operator:

a) When directed to check operation of CY Pump C - The motor is running, but the pump shaft is not turning, and the motor is making noise and vibrating.

b) When directed to perform CY Pump A prestart checks - CY Pump A prestart checks are complete. When directed to Shut/verify shut 0CY004A CY Pump A Discharge - 0CY004A is Shut. When directed to slowly open 0CY004A CY Pump A Discharge - 0CY004A is Open.

c) When directed to check operation of CY Pump A - CY Pump A discharge pressure indicates 30 psig locally. The pump is not making any unusual noises. There is no evidence of leakage locally.

(2) ROC Operator:

a) When informed that the CY system has been lost (3208.01 step 8.3.1.5 - acknowledge report.

b) If directed to check for indications of CY leakage - There are no indications of increased inleakage in the ROC.

8. LOCA/RAT trip/E51-F013 Failure/Div 3 ERAT Feed Breaker Failure/TAF Blowdown
a. Event Trigger - triggered by GCB 4506 opening during Event 7. Verify the following command(s):

(1) RAT_B_OVERCURRENT (2) ED17B221C1FO 1ETR4C1 Bkr Tripped (3) YPXMALSE_511 RR03C Lower Plenum Leak

b. Role play:

(1) Maintenance (after 2 minutes from scram announcement) - report to the MCR as IMD.

(2) Field Operator:

a) (If requested to check the status of Div 3 ERAT feeder breaker) - The overcurrent relay is tripped.

b) (If requested to manually open the RCIC injection valve) - Heading to WEC for a brief.

9. LPCS Fails to Auto Start / LPCS Injection Valve 1E21F005 Fails to Auto Open at 472 psig RPV pressure
a. Event Trigger - Initial condition
b. Role play - none ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 18 of 19

ILT 15-1 NRC Exam Scenario 1 Rev. 0 Turnover

1. Day of week and shift
  • Today day shift
2. Weather conditions
  • Thunderstorms are expected in the area within the next hour.
3. Plant power level
  • RR Pumps A and B are operating in fast speed with FCVs at 53%/54%. 2714 MWt, 872 MWe, 71.02 Mlbm/hr Core Flow.
4. Thermal Limit Problems/Power Evolutions
  • Power will be maintained at 78% throughout the shift.
  • CPS 3005.01 Unit Power Changes section 8.2 Power Decrease in progress. Step 8.2.5 is complete.
  • On Step 2 of ReMA C16-001
  • RE and Rod Verifier are available on request.
5. LCOs in effect
  • ITS 3.8.1 AC Sources - Operating, Condition B (with Division 3 DG speed droop set to 50%).
6. Surveillances in progress
  • Div 3 DG has been operating at full load for > 60 minutes IAW CPS 9080.03 DG 1C Operability - Manual and Quick Start Operability step 8.2.16.1.
  • CPS 9082.01 Offsite Source Power Verification was completed one hour ago.
7. Status of Tagged Out Equipment
  • CY Pump B (0CY01PB) is OOS for maintenance. Not expected back this shift.
8. Previous Shift Evolutions completed
  • Power was lowered to 78%. Div 3 DG was started and paralleled to RAT B IAW CPS 9080.03 DG 1C Operability - Manual and Quick Start Operability.
  • CPS 9082.01 Offsite Source Power Verification was completed one (1) hour ago.
9. Evolutions planned for the shift
  • Unload DG 1C and complete CPS 9080.03 DG 1C Operability - Manual and Quick Start Operability starting at step 8.2.16.2.
10. Risk Levels
  • Green
  • Protected Equipment: FC B
11. Dose equivalent Iodine 131
  • reading 1.5 E-6 µcuries per gram ILT 15-1 NRC Exam Scenario 1 Facility Approved Page 19 of 19

ILT 15-1 NRC Exam Scenario 2 Rev. 1 Exelon Nuclear ILT 15-1 NRC Exam Scenario Number:

NRC Exam Scenario 2 Revision Number: 1 Date: 10/28/16 Developed By: T. Jennings 9/22/16 Instructor Date Validated By: Michael Antonelli 10/28/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 1 of 18

ILT 15-1 NRC Exam Scenario 2 Rev. 1 Appendix D Scenario Outline Form ES-D-1 Facility: Clinton Power Station Scenario No.: 2 Operating Test No.: 2017-301 Examiners: ____________________________ Operators: ____________________

Initial Conditions:

  • Mode 1 Rx Power at 99%.
  • Weather conditions are calm and clear.

Turnover:

  • Priorities for the shift are as follows:
  • Shift Generator Stator Cooling Pumps IAW CPS 3110.01 01Generator Stator Cooling (GC) section 8.2.4 Shifting GC Water Pumps (MCR) to support upcoming corrective maintenance on GC Pump B.
  • Maintain power at 99% throughout the shift.

Event Malf. No. Event Event No. Type* Description 1 N/A N-BOP Shift Generator Stator Cooling (GC) Pumps.

2 YP_XMFTB_4102 I-BOP Spurious HPCS auto initiation TS-SRO 3 A02_A01_02_10_TVM C-ATC RR Pump B high vibration TS-SRO 4 N/A R-ATC Reduce power with Control Rods 5 YP_XMFTB_3917 C-BOP CCW Pump 1A trip 6 YP_XMFTB_4965 C-ATC RR Pump A trip/ATWS YP_XMFTB_4963 7 YPXMALSE_256 0.08% M-All Unisolable MSL D Leak / Multiple Secondary YAMSSIFP_4 Containment Areas above max safe YVMSSILK_8 temperatures requiring blowdown YPXMALSE_256 0.5%

8 YP_XREMT_739 C-All MSIVs fail to close on Group 1 isolation signal

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 2 of 18

ILT 15-1 NRC Exam Scenario 2 Rev. 1 Appendix D Scenario Outline Form ES-D-1 Scenario No.: 2 Operating Test No.: 2017-301 Narrative Summary Event # Description

1. Shift Generator Stator Cooling (GC) Pumps The BOP will shift GC Water Pumps IAW CPS 3110.01Generator Stator Cooling (GC) section 8.2.4 Shifting GC Water Pumps (MCR) to support upcoming maintenance on 1GC01PB.
2. Spurious HPCS auto initiation High Pressure Core Spray (HPCS) initiates with no operator action. The following annunciators are received: 5062-3C RUNNING DIESEL GEN 1C, 5062-4E HPCS PUMP AUTO START, 5064-1B AUTO START SSW PUMP 1C and 5064-4B AUTO START DG FUEL OIL XFER PUMP 1C. IAW CPS 3309.01 High Pressure Core Spray (HPCS), the crew will verify by at least two independent indications that misoperation in automatic is confirmed or adequate core cooling is assured. Once confirmed, the SRO will direct the BOP operator to secure HPCS. Technical Specification LCO 3.5.1 Actions B.1 and B.2 will be evaluated requiring verification by administrative means that the RCIC system is operable when required AND the HPCS system is restored to operable status within 14 days.
3. RR Pump B high vibration Annunciator 5003-2K RECIRC PMP B MTR VIBR HI is received. BOP will determine B RR Pump vibration levels are 20 mil P-P steady on both probes. ATC will perform RR Loop B Emergency Shutdown. SRO will enter CPS 4008.01 Abnormal Reactor Coolant Flow, CPS 4002.01 Abnormal RPV Level/Loss of Feedwater At Power and ITS LCO 3.4.1 B.1 and C.1.
4. Reduce power with Control Rods Due to the RR Pump B Emergency Loop Shutdown and using CPS 3005.01 Unit Power Changes (Figure 1: Stability Control & Power/Flow Operating Map), the crew will identify a MELLA Limit violation.

Per CPS 3005.01 Unit Power Changes, section 6.5 MELLA Limit Operational Concerns, the SRO will enter Action A.1 for ITS 3.2.1, 3.2.2 and 3.2.3 to restore power distribution limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and direct the ATC to promptly lower power via reverse rod sequence or CRAM RODS. Additionally, the SRO may direct ATC to lower reactor power to 58% RTP IAW TS LCO 3.4.1 B.1 based on having one recirculation loop in operation.

5. CCW Pump 1A trip The following annunciators are received: 5040-1B AUTO TRIP PUMP/MOTOR, 5040-2C LOW PRESS CCW HX OUTLET HEADER and 5003-3D/3K RECIRC MTR A/B WDG CLG WTR FLOW LO are received. BOP will observe that CCW Pump 1A has tripped, review the ARP and start a standby CCW pump.
6. RR Pump A trip/ATWS Annunciator 5003-1F RECIRC PMP A MTR BRKR Trip is received due to a trip of the A RR Pump. With no RR Pumps operating with the mode switch in RUN, the ATC will insert a manual scram (IAW CPS 4008.01 Abnormal Reactor Coolant Flow) and shut 1B33-F023A RR Pmp Suction Vlv. When the mode switch is placed in shutdown, the reactor will fail to scram requiring entry into EOP-1 RPV Control and then transition into EOP-1A ATWS RPV Control. Control Rods will be successfully inserted when ARI is manually initiated. Once shutdown criteria is met, the SRO will exit EOP-1A and re-enter EOP-1 RPV Control.
7. Unisolable MSL D Leak / Multiple Secondary Containment Areas above max safe temperatures requiring blowdown Multiple annunciators are received due to an unisolable MSL D leak into the Aux Building Steam Tunnel (secondary containment). The SRO will enter 4001.01 Reactor Coolant Leakage off-normal and EOP-8 Secondary Containment Control. Temperatures will continue to rise in the Secondary Containment, and when two or more areas exceed max safe temperatures, the SRO will enter EOP-3 Emergency RPV Depressurization and will direct a blowdown to be performed.
8. MSIVs fail to close on Group 1 isolation signal Condenser vacuum will continue to degrade causing the Main Turbine and the TDRFPs to trip. The MSIVs fail to automatically close but can be manually closed from the MCR.

ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 3 of 18

ILT 15-1 NRC Exam Scenario 2 Rev. 1 EOP 1, 3, 8 Critical tasks:

  • SC-1.2 SRO enters EOP-3 and performs a blowdown when 2 or more areas are above the max safe value of the same parameter (Table T, U, W), and a Primary System is discharging into the Secondary Containment, which cannot be isolated. If the crew Anticipates Blowdown using bypass valves, and in doing so two areas do not reach a max safe condition, then this critical task is considered to be met.

(PRA)

ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 4 of 18

ILT 15-1 NRC Exam Scenario 2 Rev. 1 Operator Actions Event No.(s): 1 Page 1 of 1

==

Description:==

Shift Generator Stator Cooling (GC) Pumps Initiation: Following shift turnover and when directed by the Lead Examiner Cues: Directed by SRO Time Position Applicants Actions or Behavior General Note on Requirements for Expected Annunciator Response - OP-AA-103-102 If this evolution was pre-briefed and Expected Alarms were reviewed, the following expectations apply:

  • Expected alarms will be flagged
  • When the annunciator comes in the operator will announce Expected Alarm
  • The annunciator response procedure (ARP) need not be entered since it has already been reviewed in the pre-brief.

If a pre-brief was not conducted the operator should perform the following:

  • The annunciator may then be identified as an Expected Alarm, flagged, and from that point on the ARP need not be referred to.

Key Parameter Response: GC Pump indicator lights on 1H13-P870-5017 Expected Annunciators: 5017-5A Auto Start Stator Cooling Water Pump (when the standby pump auto start feature is tested)

Automatic Actions: GC Pump 1B will auto start when the when the standby pump auto start feature is tested.

ATC

  • Monitors reactor to ensure operations remain within established bands.

o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

o Performs Plant Announcement.

BOP

  • Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

o Monitors reactor to ensure operations remain within established bands.

o Performs Plant Announcement.

IAW CPS 3110.01 Generator Stator Cooling (GC) section 8.2.4:

  • BOP obtains authorization from the Control Room Supervisor to perform critical steps ({CS})

before performing CPS 3110.01 Section 8.2.4.

  • {CS} Starts standby GC Pump 1A (1GC01PA).
  • {CS} Stops GC Pump 1B (1GC01PB). Allows the control switch to spring return to AUTO.
  • Tests the standby GC pump auto start by:
  • Depressing the Generator Cooling Water Pump Test push-button.
  • {CS} Places control switch for the GC Pump 1B (1GC01PB) in the STOP position, AND lets it spring return to AUTO.

SRO

  • Acknowledges reports from ATC/BOP.
  • Authorizes BOP to perform the critical steps contained in CPS 3110.01 Section 8.2.4 (denoted by

{CS}).

  • Provides direct oversight of the GC Pump shift.
  • Directs actions listed above.
  • Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.

Terminus: GC Pumps shifted and the auto start feature of the standby GC pump has been tested.

NOTES:

  • Solid bullets are required actions o Hollow bullets are actions that may or may not be performed ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 5 of 18

ILT 15-1 NRC Exam Scenario 2 Rev. 1 Operator Actions Event No.(s): 2 Page 1 of 1

==

Description:==

Spurious HPCS Auto Initiation Initiation: Following Event 1 and upon direction of the Lead Examiner, insert REMOTE 1.

Cues: Annunciator 5062-4E, HPCS Pump Auto Start Time Position Applicants Actions or Behavior Key Parameter Response: None Expected Annunciators: Multiple annunciators Automatic Actions: DG 1C Auto Starts, HPCS To CNMT Outbd Isln Valve (1E22-F004) OPEN ATC

  • Monitors reactor to ensure operations remain within established bands.

o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

o Performs Plant Announcements.

o Dispatches an Equipment Operator to investigate.

BOP

  • Reports issue to SRO.

o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

o Performs Plant Announcements.

o Dispatches an Equipment Operator to investigate.

Per CPS 3309.01 High Pressure Core Spray (HPCS):

  • Verifies by at least two independent indications that:
  • Misoperation in automatic is confirmed, or
  • Adequate core cooling is assured.
  • Performs shutdown of HPCS (Initiation Signal Present):

o Verifies 1E22-F012, HPCS Min Flow To Suppr Pool shuts.

o Verifies HPCS Pmp Rm Sply Fan, 1VY08CA stops.

o Verifies HPCS Pmp Rm Sply Fan, 1VY08CB stops.

SRO

  • Acknowledges report from BOP.
  • Directs actions listed above.
  • Enters and executes CPS 4002.01 Abnormal RPV Level/Loss Of Feedwater At Power o Establishes reactor water level as a critical parameter and directs ATC to scram the reactor if RPV water level reaches 48 inches and rising.
  • Evaluates and enters TS 3.5.1 Action B.1 and B.2.
  • Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.

o Contacts Maintenance to investigate.

o Informs Shift Manager.

  • Conducts a brief.

Terminus: HPCS is secured and Technical Specifications evaluated.

NOTES:

ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 6 of 18

ILT 15-1 NRC Exam Scenario 2 Rev. 1 Operator Actions Event No.(s): 3 Page 1 of 1

==

Description:==

RR Pump B High Vibration Initiation: Following Event 2 and upon direction of the Lead Examiner, insert REMOTE 2.

Cues: Annunciator 5003-2K Recirc Pmp B Mtr Vibr Hi Time Position Applicants Actions or Behavior Key Parameter Response: RR Pump Vibration Indications Expected Annunciators: 5003-2K Recirc Pmp B Mtr Vibr Hi Automatic Actions: None ATC

  • Reports issue to SRO.

Per 5003-2K Recirc Pmp B Mtr Vibr Hi and CPS 3302.01 Reactor Recirculation (RR):

  • Performs emergency loop shutdown of RR Pump B.

o Depresses P680 RR Pump B Vibration reset button.

Per CPS 4008.01 Abnormal Reactor Coolant Flow:

o Monitors RR Pump seal pressure for signs of degradation

  • Checks operation on the Power to Flow map
  • Per 3302.01 Reactor Recirculation (RR) Appendix A: RR Loop/Pump Shutdown and Isolation Hard Card:
  • Lowers RPV water level setpoint to ~ 31 inches
  • Trips RR Pump B by opening RR 3B, 4B, or 5B (any one of the three as a minimum)
  • Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

BOP o Monitors reactor to ensure operations remain within established bands.

o Checks RR Vibration Monitor and determines RR Pump B Vibration is 20 mil P-P steady on both probes o Makes plant announcement o Demands an official 3D Monicore Case

  • Acknowledges report from ATC.

SRO

  • Directs actions listed above
  • Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
  • Enters CPS 4100.02 Core Stability Control
  • Directs ATC to scram the reactor if the restricted zone is entered of if core instabilities are observed.
  • Directs ATC to monitor RPV Level and to scram if RPV level approaches 52 (Level 8).

o Directs lowering power below the MELLLA limit using reverse rod sequence or CRAM Rods within 15 minutes after plant is stable to be in compliance within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

  • With the MELLLA Limit exceeded, enters ITS LCOs 3.2.1, 3.2.2, AND 3.2.3 o Informs Shift Manager.

o Conducts a brief.

Terminus: RR Pump B secured and Tech Spec review complete.

NOTES:

ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 7 of 18

ILT 15-1 NRC Exam Scenario 2 Rev. 1 Operator Actions Event No.(s): 4 Page 1 of 1

==

Description:==

Reduce power with Control Rods Initiation: After RR Pump B has been secured Cues: Directed by SRO Time Position Applicants Actions or Behavior Key Parameter Response: Reactor Power, Rod Drive Parameters (flows, dP), Control Rods move as expected Expected Annunciators: None Automatic Actions: None ATC

67%).

o Reduces reactor power to < 58% using control rod insertion when directed by SRO

  • Monitors reactor to ensure operations remain within established bands.

o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

BOP

  • Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

o Monitors reactor to ensure operations remain within established bands.

SRO

  • Directs actions listed above
  • Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
  • Positions himself/herself in proximity of the reactor operator, typically the location from which EOP actions are directed (OP-AA-300) o Notifies Shift Manager o Notifies TSO o Conducts a brief.

Terminus: Clearly observable plant response from change in power level.

NOTES:

ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 8 of 18

ILT 15-1 NRC Exam Scenario 2 Rev. 1 Operator Actions Event No.(s): 5 Page 1 of 1

==

Description:==

CCW Pump 1A Trip Initiation: Following Event 4 and upon direction of the Lead Examiner, insert REMOTE 3 Cues: Annunciator 5040-1B Auto Trip Pump/Motor alarm.

Time Position Applicants Actions or Behavior Key Parameter Response: Lowering CCW System Header Pressure Expected Annunciators: 5040-1B Auto Trip Pump/Motor, 5003-3D RECIRC MTR A WDG CLG WTR FLOW LO, 5003-3K RECIRC MTR B WDG CLG WTR FLOW LO Automatic Actions: None ATC

  • Monitors reactor to ensure operations remain within established bands.

o Monitors control room panels, notifies SRO of unusual/unexpected conditions.

o Makes plant announcement.

o Dispatches EO to investigate CCW Pump trip.

o Monitors CCW Storage Tank Level.

o Monitors RR Pump motor and seal parameters.

BOP

  • Reports issue to SRO.

Per 5040-1B Auto Trip Pump/Motor alarm:

  • Determines CCW Pump A has tripped.
  • Determines CCW Pump B is running.
  • Starts CCW Pump C.

o Monitors CCW Storage Tank Level.

o Dispatches EO to investigate.

SRO

  • Acknowledges reports from BOP.

o Directs actions listed above.

  • Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.

o Informs Shift Manager.

o Contacts Maintenance to investigate.

o Conducts a brief.

Terminus: CCW Pump B running.

NOTES:

ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 9 of 18

ILT 15-1 NRC Exam Scenario 2 Rev. 1 Operator Actions Event No.(s): 6 Page 1 of 2

==

Description:==

RR Pump A Trip / ATWS Initiation: Following Event 5 and upon direction of the Lead Examiner, insert REMOTE 4 Cues: Annunciator 5003-1F RECIRC PMP A MTR BRKR TRIP Time Position Applicants Actions or Behavior Key Parameter Response: Reactor Power, RPV Level Expected Annunciators: 5003-1F RECIRC PMP A MTR BRKR TRIP Automatic Actions: None ATC o Reports issue to SRO.

  • Monitors reactor to ensure operations remain within established bands.

o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

  • Determines that no Recirculation Pumps are running with the Reactor Mode Switch in RUN (entry condition for CPS 4008.01 Abnormal Reactor Coolant Flow).

Per CPS 5003-1F RECIRC PMP A MTR BRKR TRIP, CPS 4008.01 Abnormal Reactor Coolant Flow and CPS 4100.01 Reactor Scram:

  • Places the mode switch in SHUTDOWN.
  • Determines that Shutdown Criteria is not met.
  • [CT] Initiates ARI.

[CT]

  • Determines Shutdown Criteria is met.
  • Carries out Scram Choreography by reporting:
  • Rod status is
  • Reactor power is and trend
  • Reactor pressure is and trend
  • Reactor level is and trend
  • Any EOPs with entry conditions (no values required)
  • IF RPV level is rising with 2 feed pumps operating, THEN Secures/verifies secured 1 Feed Pump and controls RPV water level between Level 3 and Level 8.

o Verifies Turbine and Generator trip when required.

o Shuts 1B33-F023A RR Pump A Suction Valve.

  • Stabilizes Reactor Pressure 800 to 1065 or per directed band.
  • Performs EOP actions as directed by SRO.

BOP

  • Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

o Monitors reactor to ensure operations remain within established bands.

Per CPS 4100.01 Reactor Scram:

  • Carries out Scram Choreography by:
  • Making an Announcement Reactor Scram Motor Driven Reactor Feed Pump may start Evacuate the RCIC room Evacuate the Containment Determines Rod status and reports shutdown criteria met to the SRO.

ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 10 of 18

ILT 15-1 NRC Exam Scenario 2 Rev. 1 SRO

  • Acknowledges reports from ATC/BOP.
  • Directs actions listed above.
  • Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.

o Directs ATC to scram the reactor.

  • Carries out Scram Choreography by performing an Update:
  • Update
  • Entering the Scram Off-Normal
  • End of Update Enters EOP-1A, ATWS RPV Control, and directs the following:

[CT] o Inhibit ADS.

  • [CT] Verifies ATC manually initiates ARI.
  • Determines Shutdown Criteria is met when ARI pushbuttons have been armed and depressed and transitions from EOP-1A back to EOP-1.

Directs / Verifies performance of appropriate actions per EOP-1 RPV Control:

  • Control of RPV pressure between 800 to 1065 psig with Bypass Valves or SRVs.
  • Control of RPV water level between Level 3 to Level 8 by using Preferred Injection Systems.

o Informs Shift Manager.

o Conducts a brief.

Terminus: Scram choreography complete. Rods manually inserted by initiating ARI.

NOTES:

ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 11 of 18

ILT 15-1 NRC Exam Scenario 2 Rev. 1 Operator Actions Event No.(s): 7, 8 Page 1 of 2

==

Description:==

Unisolable MSL D Leak / Multiple Secondary Containment Areas above max safe temperatures requiring blowdown / MSIVs fail to close on Group 1 Isolation Signal Initiation: Following Event 6 and upon direction of the Lead Examiner, insert REMOTE 5 Cues: Multiple Aux Building Steam Tunnel High Temperature annunciators on 1H13-P601.

Time Position Applicants Actions or Behavior Key Parameter Response: Rising temperatures on 1TR-CM326 & 327 Secondary Containment Temperature Recorder (multiple points).

Expected Annunciators: Multiple annunciators on 1H13-P601 Automatic Actions: CRVICS Group 1, 4, 5, 6 isolations on High MSL Tunnel Ambient Temperature

  • Monitors reactor to ensure operations remain within established bands.

ATC o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

o Reports EOP-8 entry on secondary containment area temperature above max normal.

  • Performs EOP actions as directed by the SRO.

o Reports EOP entry conditions.

o Coordinates with BOP to monitor and control RPV level and pressure.

o Performs a manual Group 1 Isolation of the MSLs and MSL Drains.

[CT] Per EOP-8, Secondary Containment Control (will probably be BOP):

o [CT] Initiates ADS when directed by SRO.

  • Verifies ADS actuation using the following indications:

o SPDS o DCS Display 122 (2H) [Acoustic Monitor Input]

o 1H13-P601/P642 Solenoid Indicator Lights o 1H13-P866 Valve Flow Monitor Control Panel o 1H13-P614 ADS Safety Valve Temperature recorder 1B21-R614 o Indirect indication via changes in RPV pressure, RPV level, MSL flows &

suppression pool temperatures.

  • Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

BOP o Monitors reactor to ensure operations remain within established bands.

o Reports EOP-8 entry on secondary containment area temperature above max normal.

o Monitors and reports secondary containment temperatures on 1H13-P678 recorders 1TR-CM326 and 327 (may be performed by ATC/WEC).

o Determines that Group 1 MSL Isolation Valves failed to isolate on High MSL Tunnel temperature.

o Performs a manual Group 1 Isolation of the MSLs and MSL Drains.

o Reports to the SRO when two areas are above Max Safe temperatures per EOP-8, Secondary Containment Control (may be performed by ATC/WEC).

o [CT] Initiates ADS when directed by the SRO.

[CT]

  • Verifies ADS actuation using the following indications:

o SPDS o DCS Display 122 (2H) [Acoustic Monitor Input]

o 1H13-P601/P642 Solenoid Indicator Lights o 1H13-P866 Valve Flow Monitor Control Panel o 1H13-P614 ADS Safety Valve Temperature recorder 1B21-R614 o Indirect indication via changes in RPV pressure, RPV level, MSL flows &

suppression pool temperatures.

ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 12 of 18

ILT 15-1 NRC Exam Scenario 2 Rev. 1

  • Acknowledges reports from ATC/BOP.

SRO

  • Ensures operations are conducted within the bounds of Tech Specs and IAW Operations standards and approved procedures.
  • Directs BOP/ATC to perform a manual Group 1 Isolation
  • Enters and executes EOP-3 Emergency RPV Depressurization when 2 or more of the following areas have exceeded max safe temperature values of EOP-8 Table T Area Temperature Limits:
  • Point 14 1TR-CM326 (Upper Recorder) - Aux Bldg Below MS Tunnel > 200°F
  • Point 18 1TR-CM326 (Upper Recorder) - Aux Bldg Steam Tunnel > 200°F
  • Point 15 or 16 1TR-CM327 (Lower Recorder) - Aux Bldg MSIV Room A or B >

200°F

[CT]

  • [CT] Directs initiation of ADS to blowdown the reactor.

o Informs Shift Manager.

o Conducts a brief.

Terminus: The scenario can be terminated when 7 SRVs have been opened and RPV water level is being maintained in accordance with EOP-1.

NOTES:

ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 13 of 18

ILT 15-1 NRC Exam Scenario 2 Rev. 1 Simulator Operator Instructions Initial Setup

1. Fill out plant status and have Turnover Sheet ready for the crew.
2. Verify daily lamp test completed.
3. Reset to IC-222 (PW 76319) @ 99% Power. If this is the first reset after swapping simulator loads, reset the IC twice.
4. Load the lesson plan for this scenario.
5. Verify the following commands are active:
  • YP_XREMT_739 Defeat Group 1 Interlocks
6. Place simulator in RUN.
7. Turn on and advance recorders.
8. Verify RCIC Flow Controller is set at 620 gpm.
9. Verify the AR/PR server is running and stabilize AR/PR.
10. Verify Rod Drive pressure is in the expected range of 235-265 psid.
11. Provide pull sheets: Step 30 is in progress - Gang 10B is at Position 22.
12. Make sure Sequence A is selected.
13. Make sure Individual Drive Mode is selected on the OCM.
14. Remove EST Tags from the following control switches:
15. Procedures that are expected to be used during this scenario are:
  • CPS 3110.01 Generator Stator Cooling (GC) (provided in the Crew Docs Notebook)
  • CPS 3302.01 Reactor Recirculation (RR)
  • ITS 3.4.1 Recirculation Loops Operating
  • EOP-3 Emergency RPV Depressurization (Blowdown)
  • CPS 4200.01 Auto Isolation ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 14 of 18

ILT 15-1 NRC Exam Scenario 2 Rev. 1

16. Hang OOS tags on: None
17. Identify T/S issues associated with OOS and turnover: None
18. Operating Equipment: Make sure CCW Pumps A and B are running
19. Marked up copies: None
20. Verify simulator conditions match the turnover.

ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 15 of 18

ILT 15-1 NRC Exam Scenario 2 Rev. 1 Event Triggers and Role Play Event #

1. Shift Generator Stator Cooling Pumps (Pull up 1PL10J trouble alarms)
a. Event Trigger - Following shift turnover.
b. Role play :

(1) EO (If requested) a) (when asked to check local panel alarms on 1PL10J ) - acknowledge 1PL10J alarms and provide reports.

b) (when asked to perform prestart checks for GC Pump A) - Prestart checks are complete for GC Pump A. Im standing by for pump start.

c) (when asked to check for GC Pump A locally) - GC Pump A is running normally.

2. Spurious HPCS auto initiation
a. Event Trigger - Following Event 1 and when directed by the Lead Examiner, Activate Remote 1 and verify the following command(s):

(1) YP_XMFTB_4102 (HPCS Spurious Automatic Initiation)

b. Role play (1) Maintenance (if requested) - respond as dispatching personnel to investigate.

(2) EO (when requested to check Div 3 DG and/or SX for proper operation) - wait 5 minutes and report that requested equipment is operating normally.

3. RR Pump B high vibration
a. Event Trigger - Following Event 2 and when directed by the Lead Examiner, Activate Remote 2 and verify the following command(s):

(1) A02_A01_02_10_TVM (5003-2K Recirc Pmp B Mtr Vibr Hi).

b. Role play:

(1) If asked to check RR Pump vibration monitor - RR Vibration Monitoring Computer shows RR Pump B vibration indicates 21 mils and stable.

4. Reduce power with Control Rods
a. Event Trigger - Following Event 3.
b. Role play (1) If RE and/or Rod Verifier are requested - report to the MCR as the RE and/or Rod Verifier.

(2) If Chief Examiner requires additional power reduction, enter MCR as RE and recommend lowering power an additional 5% to provide additional margin to the MELLA Limit.

5. CCW Pump 1A Trip
a. Event Trigger - When directed by the Lead Examiner, Activate Remote 3 and verify the following command(s):

(1) YP_XMFTB_3917 CCW Pump 1A Trip

b. Role play (1) EO a) (when asked to investigate trip of CCW Pump A) - The breaker for CCW Pump A is tripped on overcurrent and the motor is very hot to the touch.

b) (when asked to check for proper operation of CCW Pump C) - The C CCW Pump is operating normally.

ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 16 of 18

ILT 15-1 NRC Exam Scenario 2 Rev. 1

6. RR Pump A Trip / ATWS
a. Event Trigger - Following Event 5 and when directed by the Lead Examiner, Activate Remote 4 and verify the following command(s):

(1) YP_XMFTB_4965 (RR02A-Recirc Pump A Trip)

b. Role play (1) Maintenance (after 2 minutes from scram announcement) - report to the MCR as IMD.
7. Unisolable MSL D Leak into the Aux Building Steam Tunnel requiring blowdown
a. Event Trigger - Following Event 6 and when directed by the Lead Examiner, Activate Remote 5 and verify the following command(s):

(1) YPXMALSE_256 0.08%, YVMSSILK_4 100%, YVMSSILK_8 100%, YPXMALSE_256 0.4% (after ATC places the RMS in Shutdown)

b. Role play (1) WEC Supervisor (when requested to monitor secondary containment temperatures on P678 recorders 1TR-CM326 and 327) - report to the MCR and report temperatures as directed by the SRO.
8. MSIVs fail to close on Group 1 isolation signal
a. Event Trigger - Initial condition
b. Role play - none ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 17 of 18

ILT 15-1 NRC Exam Scenario 2 Rev. 1 Turnover

1. Day of week and shift
a. Today day shift
2. Weather conditions
a. Calm and clear.
3. Plant power level
a. The plant is in Mode 1, operating at ~ 99% power.
b. RR Pumps A and B are operating in fast speed with FCVs at 87%/89%. 3436 MWt, 1130 MWe, 83.95 Mlbm/hr Core Flow.
c. Control rods - Step 30 / Gang 10B is at position 22.
4. Thermal Limit Problems/Power Evolutions
  • Power will be maintained at 99% throughout the shift.
5. LCOs in effect
  • None
6. Surveillances in progress
  • None
7. Status of Tagged Out Equipment
  • None
8. Previous Shift Evolutions completed
  • None
9. Evolutions planned for the shift
  • Shift GC Pumps IAW CPS 3110.01 Generator Stator Cooling (GC) section 8.2.4 Shifting GC Water Pumps.
10. Risk Levels
  • Green
  • Protected Equipment: FC B
11. Dose equivalent Iodine 131
  • reading 1.5 E-6 µcuries per gram ILT 15-1 NRC Exam Scenario 2 Facility Approved Page 18 of 18

ILT 15-1 NRC Exam Scenario 3 Rev. 1 Exelon Nuclear ILT 15-1 NRC Exam Scenario Number:

NRC Exam Scenario 3 Revision Number: 1 Date: 10/25/16 Developed By: T. Jennings 9/22/16 Instructor Date Validated By: Michael Antonelli 10/28/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 1 of 17

ILT 15-1 NRC Exam Scenario 3 Rev. 1 Appendix D Scenario Outline Form ES-D-1 Facility: Clinton Power Station Scenario No.: 3 Operating Test No.: 2017-301 Examiners: ____________________________ Operators: ____________________

Initial Conditions:

  • Mode 1 at ~10% power.
  • Weather conditions are calm and clear.
  • SF System is secured to support surveillance testing.

Turnover:

  • CPS 3002.01 Heatup and Pressurization is complete with the exception of placing a TDRFP in rolling standby (to be performed at 15% power).
  • CPS 3004.01 Turbine Startup and Generator Synchronization is in progress. Section 5.0 Prerequisites are complete. Steps 8.1.1 - 8.1.4 are complete. Step 8.1.5 will be performed after placing a TDRFP in rolling standby.
  • On Step 12. Gang 3C is at position 48.
  • Priorities for the shift are as follows:

o Perform CPS 9061.03C012 Week 12 - CM, SF, SM, LD ISOL Valve Operability Checklist sections 8.12.6 and 8.12.7 (Method B). Position indication testing is NOT required. Do NOT restart SF after the completion of 9061.03C012/D012.

o Continue with power ascension to 15% IAW Step 8.1.6 of CPS 3004.01. The RE has requested single rod, single notch rod motion. After reaching 15 % power:

o Place TDRFP A in rolling standby IAW Step 8.6.3 of CPS 3002.01.

o Perform Turbine Roll IAW Step 8.1.8 of CPS 3004.01.

Event Malf. No. Event Event No. Type* Description 1 N/A N-BOP Perform 9061.03C012 Week 12 - SF Valve Operability Checklist 2 NA R-ATC Raise power with rods to 15%.

3 C-ATC ROD1233TFIA5 TS-SRO Uncoupled Rod 4 Rod4433TFIA4 C-ATC Control Rod difficult to withdraw 5 A05_A02_A0204_1_TVM; C-BOP RCIC failure to auto isolate on an isolation A05_A02_A09DS08_1 TS-SRO signal 6 SA01B1SA1CFO C-BOP #1 SA Compressor trips with failure of SA01B0SA1CFTC Standby Compressor to Auto Start 7 Seismic_Value 0.25g M-All Earthquake Multiple Annunciators Loss of Main Condenser vacuum YPXMALSE_239 YP_XMFTB_4963 ATWS 8 ed01LMalfMot(19) C-All CRD Pump B Trips During ATWS

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 2 of 17

ILT 15-1 NRC Exam Scenario 3 Rev. 1 Appendix D Scenario Outline Form ES-D-1 Scenario No.: 2 Operating Test No.: 2017-301 Narrative Summary Event # Description

1. Perform 9061.03C012 Week 12 - SF Valve Operability Checklist The SRO directs BOP to perform CPS 9061.03C012 Week 12 - SF Valve Operability Checklist sections 8.12.6 and 8.12.7 (Method B).
2. Raise power with rods to 15%

The crew will continue the power ascension to 15% by withdrawing control rods in accordance with Step 8.1.6 of CPS 3004.01 Turbine Startup and Generator Synchronization.

3. Uncoupled rod When the first in-sequence control rod (12-33) reaches position 48, the ATC will perform a coupling check IAW CPS 3304.02 Rod Control And Information System (RC&IS) section 8.1.10 Coupling Check by applying a continuous withdraw to the rod at position 48. Annunciator 5006-5G Rod Overtravel will be received, indicating that the control rod has become uncoupled from its drive mechanism. The operating crew will attempt to recouple the control rod IAW the annunciator response procedure. The SRO will evaluate and enter ITS 3.1.3 Condition C until the control rod is successfully recoupled.
4. Control Rod difficult to withdraw Control Rod 44-33 will not withdraw when using normal drive differential pressure. The crew will perform actions for a difficult to withdraw control rod IAW CPS 3304.01 Control Rod Hydraulic & Control (RD)

Section 8.3.4 Control Rod Difficult to Withdraw. When drive dP is increased to 300 psid, the control rod withdrawal will be successful, allowing the power ascension to continue.

5. RCIC failure to auto isolate on an isolation signal Annunciator 5063-4A RCIC DIV 2 STEAM LINE DIFF PRESS HIGH is received. BOP will observe that 1E51-F063 and F076 have failed to automatically shut and will manually shut them and trip the RCIC turbine. SRO will enter Tech Spec LCO 3.5.3 RCIC System Action A.1 and A.2, and LCO 3.3.6.1 Primary Containment and Drywell Isolation Instrumentation Action D.1.
6. #1 SA Compressor trips with failure of Standby Compressor to Auto Start Annunciator 5041-1A AUTO TRIP PUMP/MOTOR is received due to a trip of the #1 Service Air Compressor (1SA01C). The SRO will enter CPS 4004.01 Instrument Air Loss and direct the BOP to start the standby Service Air Compressor (0SA01C). If the crew fails to manually start 0SA01C, the air compressor will fail to automatically start to restore air pressure.
7. Earthquake/Loss of Main Condenser Vacuum/ ATWS Annunciators 5009-1A ACCL EXCDED SAFE SHUTDN EARTHQKE, 5009-2A ACCL EXCDED SEIS SW/OPER BAS EARTHQKE, 5009-2B ACCL EXCDED OPER BAS EARTHQKE and 5009-3A ACTIVATED SEIS RCDR are received. SRO enters CPS 4301.01 Earthquake. BOP observes status lights on the Seismic Warning Panel and determines that a Safe Shutdown Earthquake (SSE) has been exceeded. The earthquake causes a vacuum leak in the Main Condenser. The MCR will take actions for degrading vacuum IAW CPS 4004.02 Loss of Vacuum. Efforts to determine the location of the vacuum leak will be unsuccessful. When it is determined that vacuum cannot be controlled above 24 Hg vac, the SRO will direct the ATC to perform a Rapid Plant Shutdown or to scram the reactor. When the ATC places the Reactor Mode Switch in shutdown/attempts manual scram or ARI, control rods fail to insert.

The SRO will enter EOP-1 RPV Control and transition to EOP-1A ATWS RPV Control. The SRO will direct the BOP to start SLC and the ATC to insert control rods per EOP-1A.

8. CRD Pump B trips during ATWS CRD Pump B will trip 15 seconds after the Reactor Mode Switch is placed in Shutdown during Event 7, causing a loss of Control Rod Hydraulic (RD) Drive pressure and inability to insert control rods. The Crew will take actions to restore RD Drive pressure by starting the A RD Pump.

ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 3 of 17

ILT 15-1 NRC Exam Scenario 3 Rev. 1 EOP 1, 1A Critical tasks:

  • (Conditional) RPV-6.2 BOP Inhibits ADS (only if level challenges Level 1).
  • RPV-6.3 BOP and ATC terminates and prevents injection IAW Detail F1 to lower level to reduce subcooling or to lower level to decrease reactor power.
  • RPV-6.3 BOP terminates and prevents injection from HPCS.

ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 4 of 17

ILT 15-1 NRC Exam Scenario 3 Rev. 1 Operator Actions Event No.(s): 1 Page 1 of 1

==

Description:==

Perform 9061.03C012 Week 12 - SF Valve Operability Checklist (Method B).

Initiation: Following shift turnover and when directed by the Lead Examiner Cues: Directed by SRO Time Position Applicants Actions or Behavior General Note on Requirements for Expected Annunciator Response - OP-AA-103-102 If this evolution was pre-briefed and Expected Alarms were reviewed, the following expectations apply:

  • Expected alarms will be flagged
  • When the annunciator comes in the operator will announce Expected Alarm
  • The annunciator response procedure (ARP) need not be entered since it has already been reviewed in the pre-brief.

If a pre-brief was not conducted the operator should perform the following:

  • The annunciator may then be identified as an Expected Alarm, flagged, and from that point on the ARP need not be referred to.

Key Parameter Response: 1SF001, 1SF002, and 1SF004 valve position indication.

Expected Annunciators: 5041-7C NOT AVAILABLE SF SYSTEM DIVISION 1, 5041-7F NOT AVAILABLE SF SYSTEM DIVISION 2 Automatic Actions: None ATC

  • Monitors reactor to ensure operations remain within established bands.

o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

BOP

  • Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

o Monitors reactor to ensure operations remain within established bands.

IAW CPS 9061.03C012 Week 12 - SF Valve Operability Checklist section 8.12.6:

  • Places SF SYS DIV 1 IN TEST switch to TEST.
  • Performs open and close testing of 1SF001 and 1SF004; records data on D001.
  • Places SF SYS DIV 1 IN TEST switch to NORMAL.

IAW CPS 9061.03C012 Week 12 - SF Valve Operability Checklist section 8.12.7:

  • Places SF SYS DIV 2 IN TEST switch to TEST.
  • Performs open and close testing of 1SF002; records data on D001.
  • Places SF SYS DIV 2 IN TEST switch to NORMAL.

SRO

  • Acknowledges reports from ATC/BOP.
  • Directs actions listed above.
  • Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.

Terminus: CPS 9061.03C012 Week 12 - SF Valve Operability Checklist sections 8.12.6 and 8.12.7 complete.

NOTES:

  • Solid bullets are required actions o Hollow bullets are actions that may or may not be performed ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 5 of 17

ILT 15-1 NRC Exam Scenario 3 Rev. 1 Operator Actions Event No.(s): 2, 3, 4 Page 1 of 2

==

Description:==

Raise power with rods to 15% / Uncoupled Rod / Control Rod Difficult To Withdraw Initiation: Following Event 1 and upon direction of the SRO Cues: Annunciator 5006-5G Rod Overtravel, Control Rod 44-33 fails to move when withdraw signal is applied.

Time Position Applicants Actions or Behavior Key Parameter Response: Reactor power, Rod drive parameters (flow, dP), control rod position, Bypass Valve Position, rod uncoupled light on P680 OCM for control rod 12-33, Expected Annunciators: 5005-2K SRM Period, 5006-5G Rod Overtravel Automatic Actions: None

  • Monitors reactor to ensure operations remain within established bands.

ATC o Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

Reactivity Maneuver Per CPS 3004.01 Turbine Startup and Generator Synchronization, NF-CL-721-F-2 Control Rod Move Sheets and CPS 3304.02 RCIS:

  • Monitors nuclear instruments during rod movement.

o Monitors the Power to Flow Map during power ascension.

Uncoupled Rod Per CPS 3304.02 Rod Control And Information System, section 8.1.10 Coupling Check:

  • After 12-33 is withdrawn to position 48, applies a continuous withdraw signal to verify rod coupling.
  • Observes red full-out light for 12-33 goes out.
  • Determines control rod 12-33 is uncoupled by pressing the ROD UNCOUPLED button on the P680 OCM.
  • Informs SRO that 12-33 is uncoupled and to refer to ITS 3.1.3.

Per CPS 3304.02 Rod Control And Information System, section 8.2.6:

  • Verifies that the INDIVID DRIVE light is energized on the OCM. If not, selects individual drive by depressing DRIVE MODE push-button.
  • Inserts the drive 1 or 2 notches in an attempt to recouple the rod.
  • Determines if the rod has recoupled by fully withdrawing the drive.
  • Performs the coupling check and determines that the rod is recoupled.

o Initiates an Issue Report and contacts the Reactor Engineer regarding the uncoupled rod event.

Control Rod Difficult To Withdraw

  • Determines control rod 44-33 will not withdraw with normal drive water differential pressure.
  • Informs SRO that 44-33 will not withdraw using normal drive water differential pressure.

Per CPS 3304.01, Control Rod Hydraulic & Control (RD), Section 8.3.4:

o Increases Drive Water Diff Press in ~ 50 psid increments to a maximum of 500 psid by throttling closed on C11-F003, CRD Press Control Valve to achieve the desired differential pressure (will probably be performed by BOP).

  • Attempts to withdraw rod 44-33 using normal notch withdrawal.

o Logs Drive Water Flow and Drive Water Diff Press.

o Returns Drive Water Diff Press to normal (235 - 265 psid) using C11-F003 (will probably be performed by BOP).

ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 6 of 17

ILT 15-1 NRC Exam Scenario 3 Rev. 1

  • Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

BOP o Monitors reactor to ensure operations remain within established bands.

Reactivity Maneuver o Monitors the Power to Flow Map during power ascension.

Uncoupled Rod o Initiates an Issue Report and contacts the Reactor Engineer regarding the uncoupled rod event.

Control Rod Difficult To Withdraw

  • Increases Drive Water Diff Press in ~ 50 psid increments to a maximum of 500 psid by throttling closed on C11-F003, CRD Press Control Valve (may be performed by ATC).
  • Throttles C11-F003 to restore drive water differential pressure to normal (235 - 265 psid) after control rod is successfully withdrawn (may be performed by ATC).

o Logs Drive Water Flow and Drive Water Diff Press.

  • Acknowledges reports from ATC/BOP.

SRO

  • Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.

o Informs Shift Manager.

o Conducts a brief.

Reactivity Maneuver

  • Directs ATC to raise power to 15%.
  • Maintains oversight during control rod movement; positioned in proximity to the ATC (typically from the SRO desk).

Uncoupled Rod

  • Enters ITS 3.1.3 Action C.1 and C.2 to fully insert control rod 12-33 within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and disarm 12-33 within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
  • Exits ITS 3.1.3 Action C.1 and C.2 when 12-33 is successfully recoupled.

Control Rod Difficult To Withdraw

o Directs continuing startup.

Terminus: Clearly observable plant response from change in power level, control rod 12-33 recoupled and returned to position 48, successful withdrawal of control rod 28-33, and rod drive dP restored to normal (235 - 265 psid).

NOTES:

ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 7 of 17

ILT 15-1 NRC Exam Scenario 3 Rev. 1 Operator Actions Event No.(s): 5 Page 1 of 1

==

Description:==

RCIC failure to auto isolate on an isolation signal Initiation: Following Event 4 and upon direction of the Lead Examiner, insert REMOTE 1.

Cues: Annunciator 5063-4A RCIC Div 2 Steam Line Diff Press High alarm Time Position Applicants Actions or Behavior Key Parameter Response: Annunciator 5063-4A RCIC Div 2 Steam Line Diff Press High alarm Expected Annunciators: 5063-4A RCIC Div 2 Steam Line Diff Press High alarm Automatic Actions: None (automatic isolation fails)

ATC

  • Monitors reactor to ensure operations remain within established bands.

o Monitors control room panels, notifies SRO of unusual/unexpected conditions.

o Makes plant announcement.

BOP

  • Monitors control room panels, notifies the SRO of unusual/unexpected conditions.

o Monitors reactor to ensure operations remain within established bands.Reports issue to SRO.

Per 5063-4A RCIC Div 2 Steam Line Diff Press High alarm:

o Determines that a Group 5 isolation has not occurred.

  • Manually initiates a Group 5 isolation by:

o Verifying closed 1E51-F076, RHR & RCIC Stm Supp Warm Up Isol Valve.

  • Tripping the RCIC turbine.

SRO

  • Acknowledges report from BOP.
  • Directs actions listed above.
  • Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.
  • Directs performing a Group 5 isolation.
  • Reviews and enters ITS 3.5.3 A.1 and A.2, and 3.3.6.1 D.1.

o Informs Shift Manager.

o Contacts maintenance to investigate.

o Conducts a brief.

Terminus: Technical Specification review complete.

NOTES:

ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 8 of 17

ILT 15-1 NRC Exam Scenario 3 Rev. 1 Operator Actions Event No.(s): 6 Page 1 of 2

==

Description:==

Service Air Compressor (SAC) trip / failure of the standby SAC to auto start Initiation: Following Event 5 and upon direction of the Lead Examiner, insert REMOTE 2.

Cues: Annunciator 5041-1A, Auto Trip Pump/Motor Time Position Applicants Actions or Behavior Key Parameter Response: SA header pressure decreases, 1SA01C amber trip light energized Expected Annunciators: 5041-1A Auto Trip Pump/Motor Automatic Actions: None ATC

  • Monitors reactor to ensure operations remain within established bands.

o Monitors control room panels and notifies the SRO of any unusual or unexpected conditions.

o Dispatches Equipment Operator to investigate.

Per CPS 4004.01 Instrument Air Loss:

o IF air pressure lowers to 60 psig and cannot be restored, or SDV level increases resulting in a rod block, or any control rod begins to drift, THEN turn mode switch to SHUTDOWN.

BOP

  • Monitors control room panels and notifies the SRO of any unusual or unexpected conditions.

o Monitors reactor to ensure operations remain within established bands.

  • Determines that 1SA01C has tripped.
  • Reports issue to SRO.
  • Refers to the ARP for 5041-1A.

Per 5041-1A AUTO TRIP SERVICE AIR COMPRESSOR and CPS 4004.01 Instrument Air Loss:

  • Starts standby Service Air Compressor (0SA01C) (fails to Auto Start).

o Dispatches Equipment Operator to investigate cause of trip.

SRO

  • Acknowledges report from BOP.
  • Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards, and approved procedures.
  • Enters and executes CPS 4004.01 Instrument Air Loss.
  • Directs actions listed above.

o Informs Shift Manager.

o Contacts Maintenance to investigate.

o Conducts a brief.

Terminus: 0SA01C running and maintaining SA header pressure.

NOTES:

ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 9 of 17

ILT 15-1 NRC Exam Scenario 3 Rev. 1 Operator Actions Event No.(s): 7, 8 Page 1 of 3

==

Description:==

Earthquake / Loss of Main Condenser vacuum / ATWS / CRD Pump B Trips During ATWS Initiation: Following Event 6 and upon direction of the Lead Examiner, insert REMOTE 3.

Cues: Multiple annunciators on 1H13-P601 and P870 Time Position Applicants Actions or Behavior Key Parameter Response: Lowering (degrading) Main Condenser Vacuum Expected Annunciators: 5009-1A ACCL EXCDED SAFE SHUTDN EARTHQKE, 5009-2A ACCL EXCDED SEIS SW/OPER BAS EARTHQKE, 5009-2B ACCL EXCDED OPER BAS EARTHQKE and 5009-3A ACTIVATED SEIS RCDR Automatic Actions: None ATC

  • Monitors reactor to ensure operations remain within established bands.

o Monitors control room panels and notifies the SRO of any unusual or unexpected conditions.

o Recognizes lowering Main Condenser Vacuum and notifies SRO.

Per CPS 4301.01 Earthquake, checks the following parameters:

  • Reactor power, RPV pressure, RPV level
  • Feed flow, Steam flow
  • Generator load, Turbine vibration o Electrical distribution system integrity o Off-Gas, Area Radiation & Process Radiation Monitors o Leak detection systems o Balance of plant annunciators
  • Reactor Feed Pump vibrations
  • Trip and isolation logic status Per 5007-2B/2D Low Vacuum LP Turb 1A/1B Exh Hood:

o Monitors condenser vacuum.

  • Carries out ATWS Scram Choreography by reporting the following:
  • Mode Switch in shutdown, power is
  • Shutdown Criteria is not met
  • Reactor Power is and trend
  • Reactor Pressure is and trend
  • Reactor Level is and trend
  • Any EOPs with entry conditions (EOP-1 on power)

[CT] * [CT] Inserts Control Rods per CPS 4411.08 & 4410.00C012 (only critical if SLC is not started).

[CT] * [CT] Terminates and prevents injection from Condensate/Feedwater when directed by the SRO.

[CT] * [CT] Controls level in Level Band B or C of EOP-1A (depending on whether BIT Override is met).

o Reports critical parameters as required.

o Coordinates with BOP to monitor and control RPV level and pressure.

ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 10 of 17

ILT 15-1 NRC Exam Scenario 3 Rev. 1 BOP

  • Monitors control room panels and notifies the SRO of unusual or unexpected conditions.

o Monitors reactor to ensure operations remain within established bands.

o Recognizes lowering Main Condenser Vacuum and notifies SRO.

o Performs a Manual Group 1 Isolation when directed by the SRO.

Per CPS 5009-1A, 2A, 2B and 3A and CPS 4301.01 Earthquake:

  • Verifies at Seismic Warning Panel 1H13-P865 (NOTE: This panel is only simulated at the simulator V-Panel in the back corner of the simulator):
  • Operating Basis Equake red light ON.
  • Seismic System Triggered red light ON.

Per CPS 4301.01 Earthquake, checks the following parameters:

  • Electrical distribution system integrity
  • Off-Gas, Area Radiation & Process Radiation Monitors
  • Leak detection systems
  • Tank levels (MC, CY, DG Fuel Oil, etc.)

o Trip and isolation logic status

  • Directs Equipment Operators to perform visual inspection of plant equipment for damage.
  • Announces:
  • Motor Driven Reactor Feed Pump may start
  • Evacuate the RCIC room
  • Evacuate the Containment
  • Determines rod status and reports Shutdown Criteria is not met to SRO.

[CT] * [CT] Inhibits ADS when directed by SRO.

[CT] * [CT] Starts SLC (only critical if control rods are not inserted).

  • [CT] Terminates and prevents injection of HPCS, RCIC (only performed and critical if

[CT] NOT running), LPCS, & LPCI using hard cards at P601.

ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 11 of 17

ILT 15-1 NRC Exam Scenario 3 Rev. 1

  • Acknowledges reports from ATC/BOP.

SRO

  • Determines that a valid seismic event has occurred.
  • Directs performance of plant and MCR Panel walkdowns.
  • Enters and executes CPS 4004.02 Loss of Vacuum.

o Notifies Engineering Duty Director / Manager that a seismic event has occurred and to perform CPS 1337.05 Seismic Response and Reporting.

o Notifies Illinois Department of Natural Resources of the seismic event.

o Notifies Shift Manager of the event.

o Directs performance of CPS 1850.00 Post-Earthquake CPS Organizational Response to verify integrity of buildings systems and components.

o Directs CMO to perform thermography on switchyard components and transformers, including bushings.

o Makes preparations for performing an orderly plant shutdown.

o Enters ORM 2.2.7 Seismic Monitoring Instrumentation Action 3.2.7.a, with one or more of the above seismic monitoring instruments inoperable for more than 30 days, initiate a Condition Report.

Per CPS 4004.02 Loss of Vacuum:

  • When it is determined that Main Condenser Vacuum cannot be controlled above 24 Hg vacuum, directs ATC to place the Reactor Mode Switch in SHUTDOWN.

o Directs a manual Group 1 Isolation to be performed.

Enters CPS 4100.01 Reactor Scram

  • Carries out ATWS Scram Choreography by performing an Update:
  • Entering the Scram Off-Normal.
  • End of Update.

Enters EOP-1A, ATWS RPV Control and directs:

  • Inhibiting ADS.
  • Initiating ARI.
  • [CT] Terminate and Prevent injection of HPCS.

[CT]

[CT]

4411.10.

  • Stabilization of RPV Pressure 800 to 1065 psig with Bypass Valves and SRVs.

o Informs the Shift Manager.

o Conducts a brief.

  • Ensures operations are conducted within the bounds of Tech Specs and IAW Operations expectations, standards and approved procedures.

Terminus: The scenario can be terminated when control rods are being inserted and RPV water level is being maintained in accordance with EOP-1A.

NOTES:

ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 12 of 17

ILT 15-1 NRC Exam Scenario 3 Rev. 1 Simulator Operator Instructions Initial Setup

1. Fill out plant status and have Turnover Sheet ready for the crew.
2. Verify daily lamp test completed.
3. Reset to IC-223 (PW 76319) @ 10% Power. If this is the first reset after swapping simulator loads, reset the IC twice.
4. Load the lesson plan for this scenario.
5. Verify the following commands are active:
  • ROD4433TFIA4 Rod 44-33 Is Stuck At Present Location
6. Place simulator in RUN.
7. Turn on and advance recorders.
8. Verify RCIC Flow Controller is set at 620 gpm.
9. Verify the AR/PR server is running and stabilize AR/PR.
10. Verify Rod Drive pressure is in the expected range of 235-265 psid.
11. Provide pull sheets: On step 12. Gang 3C is at position 48.
12. Make sure Sequence A is selected.
13. Make sure Individual Drive Mode is selected on the OCM.
14. Remove EST Tags from the following control switches:
15. Procedures that are expected to be used during this scenario are:
  • CPS 3004.01 Heatup and Presurization
  • CPS 9061.03C012/D012 Week 12 - CM, SF SM, LD ISOL Valve Operability
  • CPS 3304.02 Rod Control and Information System (RC&IS)
  • CPS 4001.02 Automatic Isolation
  • CPS 4004.01 Instrument Air Loss
  • CPS 4004.02 Loss of Vacuum
16. Hang OOS tags on: None ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 13 of 17

ILT 15-1 NRC Exam Scenario 3 Rev. 1

17. Identify T/S issues associated with OOS and turnover: None
18. Operating Equipment:
  • Verify 1SA01C is running
  • Verify Suppression Pool Cleanup (SF) is shutdown (pumps secured, SF001/2/4 SHUT)
19. Marked up copies: None
20. Verify simulator conditions match the turnover.

ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 14 of 17

ILT 15-1 NRC Exam Scenario 3 Rev. 1 Event Triggers and Role Play Event #

1. Perform 9061.03C012 Week 12 - SF Valve Operability Checklist
a. Event Trigger - Following shift turnover.
b. Role play - none
2. Raise power with rods to 15%.
a. Event Trigger - Following Event 1 and when directed by the SRO.
b. Role play (1) Booth Operator - (when RE and/or Rod Verifier requested) - report to the MCR as the RE and/or Rod Verifier.
3. Uncoupled Rod
a. Event Trigger - When Rod12-33 is withdrawn to position 48.
b. Role play (1) Booth Operator - When control rod 12-33 is inserted from position 48, verify Delete ROD1233TFIA5 is inserted (Delete Rod 12-33 Malfunction).
4. Control Rod Difficult To Withdraw
a. Event Trigger - Following Event 3 when withdrawal of rod 44-33 is attempted:

(1) Verify ROD4433TFIA4 is inserted (Rod 44-33 Is Stuck At Present Location).

b. Role play (1) System Engineer (if asked about the performance / maintenance history of control rod 44-33) - The seals for rod 44-33 were NOT replaced during the last outage. There are no previous problems noted in the history file for 44-33.
5. RCIC failure to auto isolate on an isolation signal
a. Event Trigger - When directed by the Lead Examiner, Activate Remote 1 and verify the following command(s):

(1) A05_A02_A0204_1_TVM (2) A05_A02_A09DS08_1 On

b. Role play:

(1) Maintenance (if asked to investigate Div 2 Steam Line Diff Press High alarm malfunction) - Well send a technician to the control room to gather information for the troubleshooting plan.

(2) If RCIC Flow ATMs are checked:

ATM Value Trip Status 1E31-N690B 100% (300 H 2 O) (upscale) Tripped 1E31-N683B 100% (300 H 2 O) (upscale) Tripped 1E31-N690A 50% (0 H 2 O) Not tripped 1E31-N683A 50% (0 H 2 O) Not tripped 1E31-N691B 50% (0 H 2 O) Not tripped 1E31-N684B 50% (0 H 2 O) Not tripped 1E31-N691A 50% (0 H 2 O) Not tripped 1E31-N684A 50% (0 H 2 O) Not tripped ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 15 of 17

ILT 15-1 NRC Exam Scenario 3 Rev. 1

6. #1 SA Compressor trips with failure of Standby Compressor to Auto Start
a. Event Trigger - Following Event 5 and when directed by the Lead Examiner, Activate Remote 2 and verify the following command(s):

(1) SA01B1SA1CFO (2) SA01B0SA1CFTC

b. Role play (If requested):

(1) Maintenance (investigate loss of service air pressure or failure of compressor to start) - Report, I will brief and dispatch personnel to investigate.

(2) EO (investigate trip of 1SA01C) - Report, The breaker for 1SA01C is tripped on overcurrent. There are no abnormalities locally. 0SA01C is operating normally.

(3) EO (if directed to support shifting standby Service Air Compressors - acknowledge the order and report, Im on my way up to get a brief.

7. Earthquake / Loss of Main Condenser vacuum / ATWS
a. Event Trigger - Following Event 6 and when directed by the Lead Examiner, Activate Remote 3 and verify the following command(s):

(1) SEISMIC_VALUE 0.25g (2) A04_ A08_02_1_TVM (3) A04_ A05_01_4_TVM (4) A04_ A05_01_3_TVM

b. Role play (1) Security (if asked if ground motion felt): Ive had several security officers report that ground motion was felt.

(2) EO (when directed to investigate loss of condenser vacuum): I will verify Travelling Screens/Screenwash operating properly and verify the Vacuum Breaker Loop Seal is filled.

(3) EO (if asked to check RFP Seal Tank Level) - 1LIC-TD040 is in auto; level is in the green band controlling at 10.

(4) EO (if asked to make preparations to startup a Condenser Vacuum Pump): Im on my way to the WEC office for a brief.

(5) Booth operator (when asked to defeat ATWS interlocks per 4410.00C012 Defeating ATWS Interlocks) - defeat the following isolations (using the ATWS actions in the simulator lesson plan) in the order provided by the ATC:

a) Defeat IA Isolations b) Defeating RPS Logic Trips c) Defeating Rod Pattern Controller d) Defeating ARI Logic Trips (6) Maintenance (after 2 minutes from scram announcement) - report to the MCR as IMD.

8. CRD Pump B Trips During ATWS
a. Event Trigger - Triggered when RMS is placed in shutdown during event 7.
b. Role play (1) EO (when directed to open 1C11-F116, Suct Filt Bypass and 1C11-F117, Suct Filt Bypass for 4411.08):

1C11-F116 and 1C11-F117 are open.)

(2) EO (when directed to shut/verify shut 1C11-F014A, Pump A Stop Chk Discharge Valve for 4411.08): Insert YP_XREMT_697 Normal and report, 1C11-F014A is shut.

(3) EO (when directed to open 1C11-F014A, Pump A Stop Chk Discharge Valve for 4411.08): Insert YP_XREMT_697 Open and report, 1C11-F014A is open.

ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 16 of 17

ILT 15-1 NRC Exam Scenario 3 Rev. 1 Turnover

1. Day of week and shift
  • Today day shift
2. Weather conditions
  • Calm and clear.
3. Plant power level
  • The plant is in Mode 1, operating at ~ 10% power.
  • RR Pumps A and B are operating in slow speed with FCVs at 90%/90%. 346 MWt, 0 MWe, 27.3 Mlbm/hr Core Flow.
  • CPS 3002.01 Heatup and Pressurization is complete with the exception of placing a TDRFP in rolling standby (to be performed at 15% power).
  • CPS 3004.01 Turbine Startup and Generator Synchronization is in progress. Section 5.0 Prerequisites are complete. Steps 8.1.1 - 8.1.5 are complete.
  • MDRFP is on the MLC in automatic.
4. Thermal Limit Problems/Power Evolutions
  • Continue with power ascension to 15% IAW Step 8.1.6 of CPS 3004.01. The RE has requested single rod, single notch rod motion. After reaching 15% power:
  • Place TDRFP A in rolling standby IAW Step 8.6.3 of CPS 3002.01.
  • Perform Turbine Roll IAW Step 8.1.8 of CPS 3004.01.
5. LCOs in effect
  • None
6. Surveillances in progress
  • CPS 9061.03C012/D012 - Week 12 - SF Valve Operability Checklist
7. Status of Tagged Out Equipment
  • None
8. Previous Shift Evolutions completed
  • SF System was secured to support performance of CPS 9061.03C012/D012.
9. Evolutions planned for the shift
  • Priority 1 - Perform CPS 9061.03C012 Week 12 - CM, SF, SM, LD ISOL Valve Operability Checklist sections 8.12.6 and 8.12.7 (Method B). Position indication testing is NOT required. Do NOT restart SF after the completion of 9061.03C012/D012.
  • Priority 2 - Continue with power ascension to 15% IAW Step 8.1.6 CPS 3004.01.
10. Risk Levels
  • Green
  • Protected Equipment: FC B
11. Dose equivalent Iodine 131
  • Reading 1.5 E-6 µcuries per gram.

ILT 15-1 NRC Exam Scenario 3 Rev 1 Facility Approved Page 17 of 17