MONTHYEARML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 ML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A4902022-01-28028 January 2022 Scenarios ML22157A0722022-01-28028 January 2022 Administered Scenarios ML22153A5142022-01-28028 January 2022 Inplant JPM ML22153A5102022-01-28028 January 2022 ES-401-6 Clinton 2022 ML22153A4882022-01-28028 January 2022 RO Admin JPM ML22153A4942022-01-28028 January 2022 Sim JPM ML22157A0762022-01-28028 January 2022 Administered Sim JPM ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22157A4102022-01-28028 January 2022 ES-401-4 Record of Rejected KAs Jan 22 Clinton Written Exam ML22153A5292022-01-28028 January 2022 ES-D-1 Clinton Jan 2022 ML22157A3952022-01-28028 January 2022 ES-301-7 Op Test Review Wksht Clinton 22 ML22153A5282022-01-28028 January 2022 ES-401-3 Clinton Jan 2022 ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A1192022-01-28028 January 2022 Administered SRO Written Exam ML22157A0862022-01-28028 January 2022 Administered SRO Admin JPM ML22157A1452022-01-28028 January 2022 Administered in Plant JPM U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22153A5072022-01-28028 January 2022 ILT 20-1 NRC RO and SRO Submittal ML22153A5272022-01-28028 January 2022 ES-401-1 Clinton Jan 2022 ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A4782022-01-28028 January 2022 ES-301-3 ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22153A5302022-01-28028 January 2022 ES-301-1 Clinton Jan 22 ML22157A1982022-01-28028 January 2022 Administered RO Admin JPM ML22153A4982022-01-28028 January 2022 SRO Admin JPM ML22157A4162022-01-28028 January 2022 Outline Review Comments Clinton 2022 ML22153A4682022-01-28028 January 2022 ES-301-4 2024-06-27
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 ML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22153A5282022-01-28028 January 2022 ES-401-3 Clinton Jan 2022 ML22153A5102022-01-28028 January 2022 ES-401-6 Clinton 2022 ML22157A1192022-01-28028 January 2022 Administered SRO Written Exam ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22157A0762022-01-28028 January 2022 Administered Sim JPM ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22153A4722022-01-28028 January 2022 ES-301-6 ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22153A4782022-01-28028 January 2022 ES-301-3 ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22157A4142022-01-28028 January 2022 ES-401-9 Written Exam Review Wksht Clinton 22 U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A5292022-01-28028 January 2022 ES-D-1 Clinton Jan 2022 ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A4162022-01-28028 January 2022 Outline Review Comments Clinton 2022 ML22157A3952022-01-28028 January 2022 ES-301-7 Op Test Review Wksht Clinton 22 ML22153A5272022-01-28028 January 2022 ES-401-1 Clinton Jan 2022 ML22157A1452022-01-28028 January 2022 Administered in Plant JPM ML22153A4942022-01-28028 January 2022 Sim JPM ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22153A5072022-01-28028 January 2022 ILT 20-1 NRC RO and SRO Submittal ML22153A5142022-01-28028 January 2022 Inplant JPM ML22157A0702022-01-28028 January 2022 Administered RO Written Exam ML22153A4682022-01-28028 January 2022 ES-301-4 ML22157A0862022-01-28028 January 2022 Administered SRO Admin JPM ML22153A5252022-01-28028 January 2022 ES-301-2 Clinton Jan 22 ML22157A4102022-01-28028 January 2022 ES-401-4 Record of Rejected KAs Jan 22 Clinton Written Exam ML22157A3822022-01-28028 January 2022 ES-403-1 Clinton 2022 ML22153A4902022-01-28028 January 2022 Scenarios 2024-06-27
[Table view] |
Text
ES-301 Simulator Scenario Quality Checklist Form ES-301-4 Facility: Clinton Date of Exam: 1l3O/17 Scenario Numbers: 1 l2 /SOperaling Test Number: 2017-301 lnitials OUALITATIVE ATTRIBUTES a b. c#
The initial conditions are realistic, n that some equipment and/or instrumentation may be out of service, but it does not cue the operalors into expected events. fl 4 t,
- 2. The scenarios consist mostly of related events t, 1 A. *a4
- 3. Each event description conssts of
/ I o lhe point in the scenaro when it is to be initiated
. the malfunction(s) or conditions that are entered to initiate the event r the symptoms/cues that will be visible to the crew ,[
o the expected operator actions (by shft position) o the event termination point (if applicable) / ry
- 4. The events are valid with regard to physics and thermodynamcs. il /y .ta-I
- 5. Sequencing and timing of events s reasonable, and allows the examination team to obtain complete evaluation results commensurate with the scenario objectives.
I 6 ilI
- 6. lf tme compression techniques are used, the scenario summary clearly so indicates.
Operators have sufficient time to carry out expected activities without undue time constrainls.
Cues are given. fl9 rt/*
( ^k 7 The simulator modeling is not altered. t]
- 8. The scenarios have been validated. Pursuant to 10CFR55.46(d), any open simulator ,ø performance deficiencies or deviations from the referenced plant have been evaluated to ensure that functional fidelity is mantained while running the planned scenarios.
q ry
- 9. Every operator wll be evaluated using at least one new or significantly modified scenario.
All other scenarios have been altered in accordance with Section D.5 of ES-301. & q w)
- 10. All individual operator competencies can be evaluated, as verified using Form ES-301-6 (submt the form along with the simulator scenarios).
q ry 11 The scenario set provides the opportunity for each applicant to be evaluated in each of the applicable rating factors. (Competency Rating factors as described on forms ES-303-1 and ES-303-3) ø q og
- 12. Each applicant wll be signífcantly nvolved in the minmum number of transents and events specified on Form ES-301-5 (submit the form with the simulator scenarios).
,1
/ + u7
- 13. The level of difficulty is appropriate to supporl licensing decisions for each crew position. ¿ tu4 I
Target Quantitative Attributes (Per Scenario; See Section D.5.d) Actual Attributes
'l Malfunctions after EOP entry (1-2) I /l/ \ lL O.t
- 2. Abnormal events (2-4) q /, / q I ¿ A¿,
- 3. Major transients ('l -2) I /l t I ( I dta
- 4. EOPs entered/requiring substantive actions (1 -2) A t2 t 2 I hl-
- 5. EOP contingencies requiring substantive actions (0-2) t/l/o 0 / d4
- 6. Critical tasks (2-3) 2. t7 tq I e, NOTE - The faclity signature is not applicable for NRC-developed tests. I t,
- lndependent NRC reviewer initial items in Column "c", chief examiner concurrence required.
ES-301, Page 25 ot 27