| | number = ML17193A219 | | | number = ML17193A219 |
| | issue date = 07/12/2017 | | | issue date = 07/12/2017 |
| | title = RWCU LAR MF8318, Formal Release of RAIs | | | title = NRR E-mail Capture - Columbia RWCU LAR MF8318, Formal Release of RAIs |
| | author name = Klos J | | | author name = Klos J |
| | author affiliation = NRC/NRR/DORL/LPLIV-1 | | | author affiliation = NRC/NRR/DORL/LPLIV-1 |
Line 13: |
Line 13: |
| | document type = E-Mail, Request for Additional Information (RAI) | | | document type = E-Mail, Request for Additional Information (RAI) |
| | page count = 4 | | | page count = 4 |
| | | project = |
| | | stage = Other |
| }} | | }} |
|
| |
|
Line 27: |
Line 29: |
| RG 1.26 establishes an acceptable method for complying with requirements of GDC 1 and 10 CFR 50.55a by classifying fluid systems and components important to safety and applying corresponding quality codes and standards to such systems and components. This RG describes an acceptable method for determining quality standards for Quality Group B, C, and D water- and steam-containing components important to safety of water-cooled nuclear power plants. | | RG 1.26 establishes an acceptable method for complying with requirements of GDC 1 and 10 CFR 50.55a by classifying fluid systems and components important to safety and applying corresponding quality codes and standards to such systems and components. This RG describes an acceptable method for determining quality standards for Quality Group B, C, and D water- and steam-containing components important to safety of water-cooled nuclear power plants. |
| Columbia FSAR Section 3.2.2 states that the Quality Group classifications indicated in Tables 3.2-1 and 3.2-2 meet the requirements of 10 CFR 50.55a and Regulatory Guide 1.26, Revision 3. Table 3.2-2 shows that Quality Group C corresponds to ASME Section III, Class 3 equipment designed to Subsections NA and ND for piping, valves, and pressure vessels. Table 3.2-2 also shows that the design standards for Quality Group D components are ASME B31.1 for piping and valves, and ASME Boiler and Pressure Vessel Code, Section VIII, Division 1, for pressure vessels. | | Columbia FSAR Section 3.2.2 states that the Quality Group classifications indicated in Tables 3.2-1 and 3.2-2 meet the requirements of 10 CFR 50.55a and Regulatory Guide 1.26, Revision 3. Table 3.2-2 shows that Quality Group C corresponds to ASME Section III, Class 3 equipment designed to Subsections NA and ND for piping, valves, and pressure vessels. Table 3.2-2 also shows that the design standards for Quality Group D components are ASME B31.1 for piping and valves, and ASME Boiler and Pressure Vessel Code, Section VIII, Division 1, for pressure vessels. |
| As specified in 10 CFR 50.55a(g)(4), components (including supports) that are classified as ASME Code Class 1, Class 2, and Class 3 must meet the requirements, except design and access provisions and preservice examination requirements, set forth in Section XI of the ASME Boiler and Pressure Vessel Code (BPVC) to the extent practical within the limitations of design, geometry, and materials of construction of the components. As stated in the Enclosure to the Energy Northwest letter dated February 4, 2016, (ADAMS Accession No. | | As specified in 10 CFR 50.55a(g)(4), components (including supports) that are classified as ASME Code Class 1, Class 2, and Class 3 must meet the requirements, except design and access provisions and preservice examination requirements, set forth in Section XI of the ASME Boiler and Pressure Vessel Code (BPVC) to the extent practical within the limitations of design, geometry, and materials of construction of the components. As stated in the Enclosure to the Energy Northwest letter dated February 4, 2016, (ADAMS Accession No. ML16035A405) the applicable ASME Section XI Code Edition and Addenda for Columbias fourth ten-year inservice inspection interval ending December 12, 2025, is the 2007 Edition through the 2008 Addenda. |
| ML16035A405) the applicable ASME Section XI Code Edition and Addenda for Columbias fourth ten-year inservice inspection interval ending December 12, 2025, is the 2007 Edition through the 2008 Addenda. | |
| The applicable requirements of Section XI of the ASME BPVC include inservice examination and repair and replacement criteria. The repair and replacement criteria of Subsection IWA apply to all ASME Class 3 components. The examination requirements of Subsection IWD applied to all ASME Class 3 pressure-retaining components and their integral attachments on Class 3 systems in support of certain functions, including emergency core cooling and containment heat removal. These requirements are not applicable to Quality Group D components and are not included in the ASME B31.1 code. | | The applicable requirements of Section XI of the ASME BPVC include inservice examination and repair and replacement criteria. The repair and replacement criteria of Subsection IWA apply to all ASME Class 3 components. The examination requirements of Subsection IWD applied to all ASME Class 3 pressure-retaining components and their integral attachments on Class 3 systems in support of certain functions, including emergency core cooling and containment heat removal. These requirements are not applicable to Quality Group D components and are not included in the ASME B31.1 code. |
| 1 | | 1 |
|
---|
Category:E-Mail
MONTHYEARML24291A1072024-10-16016 October 2024 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - Application to Revise TS to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements - EPID L-2024-LLA-0132 ML24215A3672024-08-0101 August 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station - License Amendment Request to Revise Emergency Plan - EPID L-2024-LLA-0011 ML24183A2392024-07-0101 July 2024 NRR E-mail Capture - LIC-109 Acceptance - Columbia Generating Station - Relief Request for the Fourth Ten-Year Interval Inservice Testing - EPID L-2024-LLR-0039 ML24169A0402024-06-14014 June 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station (Columbia) - Relief Requests for the Fifth Ten-Year Interval Inservice Testing - EPIDs (L-2024-LLR-007 Through 0013) ML24103A2022024-04-0909 April 2024 EN 57068 - Transco Products Inc Part 21 Initial Notification of Unverified Critical Characteristics of Darmatt KM-1 Flat Board ML24060A1022024-02-28028 February 2024 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2023 Biological Monitoring Report ML24053A0092024-02-21021 February 2024 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Relief Requests for the Fifth Ten-Year Interval Inservice Testing - EPIDs L-2024-LLR-0007 Through 00013 ML24008A0022024-01-0505 January 2024 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of License Amendment Request for Application to Revise TS to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation - EPID L-2023-LLA-0170 ML23278A0042023-10-0404 October 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling - EPID L-2023-LLA-0128 ML23275A0092023-09-29029 September 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise Tech Specs to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling - EPID: L-2023-LLA-0128 ML23150A2502023-05-26026 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - License Amendment Request to Clean-Up Operating License and Appendix a, Technical Specifications - EPID L-2023-LLA-0062 ML23124A2412023-05-0404 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise TS to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position - EPID L-2023-LLA-0063 ML23124A0062023-05-0303 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - Application to Revise Tech Specs to Adopt TSTF-541, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling - EPID L-2023-LLA-0063 ML23065A0422023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2022 Biological Monitoring Report ML22343A1802022-12-0808 December 2022 February 2023 Emergency Preparedness Program Inspection - Request for Information ML22349A2002022-12-0101 December 2022 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2022 Priority Pollutant Discharge Monitoring Report ML22312A0042022-11-0707 November 2022 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Fourth 10 Year ISI RR 4ISI-11 - EPID L-2022-LLR-0071 ML22301A1432022-10-28028 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Adopt TSTF-505 - EPID L-2022-LLA-0023 ML22256A2002022-09-13013 September 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22241A0182022-08-26026 August 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22235A1052022-08-22022 August 2022 August 2022 Emergency Preparedness Exercise Inspection Request for Information ML22210A0072022-07-28028 July 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22173A0682022-06-17017 June 2022 Email Concurrence on SE Input for Columbia Pltr LAR ML22166A4122022-06-15015 June 2022 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - Application to Revise TS to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling - EPID L-2022-LLA-0081 ML22144A0342022-05-18018 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22075A3392022-03-15015 March 2022 NRR E-mail Capture - Columbia Generating Station - Audit Questions - Regulatory Audit of License Amendment Request to Adopt 50.69 - Categorization Process - EPID L-2021-LLA-0207 ML22067A0132022-03-0707 March 2022 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of License Amendment Request to Adopt TSTF-505, Revision 2, Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4b - EPID L-2022-LLA-0023 A002515, NRR E-mail Capture - (External Sender) Energy Northwest Columbia Generating Station 2021 Priority Pollutant Discharge Monitoring Report2022-01-12012 January 2022 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2021 Priority Pollutant Discharge Monitoring Report ML21348A1852021-12-14014 December 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia - License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors - EPID L-2021-LLA-0207 ML21335A0182021-11-30030 November 2021 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Requested Licensing Action - License Amendment Request to Change TS 3.4.11 Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML21216A0502021-08-0303 August 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia - License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO EPID L-2021-LLA-0259 ML21209A9792021-07-28028 July 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21162A3062021-06-11011 June 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - License Amendment Request to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement - EPID L-2021-LLA-0084 ML21137A0012021-05-14014 May 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21120A1182021-04-30030 April 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - On-Site Cooling System Sediment Disposal Approval Request - EPID L-2020-LLL-0031 ML21109A2762021-04-0808 April 2021 Email Request for Information for Columbia Generating Station'S PIR Inspection_Redacted ML21068A2842021-03-0404 March 2021 2021002 Inservice Inspection (ISI) Request for Information (RFI) ML21036A2932021-02-0404 February 2021 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2020 Biological Monitoring Report ML20357B1502020-12-22022 December 2020 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia - License Amendment Request - Adoption of TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Rev. 2 - EPID L-2020-LLA-0259 ML20336A1852020-11-30030 November 2020 NRR E-mail Capture - Final - RAI - Columbia - One -Time Exemption from 10 CFR 73, App B, Sect VI, Subsection C.3.(l)(1) Regarding Annual Force-On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20325A0402020-11-19019 November 2020 NRR E-mail Capture - Draft - RAI - Columbia - One -Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force -On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20314A0452020-11-0606 November 2020 NMFS to Energy Northwest, Entrainment Study Results for Columbia Generating Station ML20297A3032020-10-22022 October 2020 NRR E-mail Capture - LIC-109 Acceptance Review of License Amendment Request for Columbia - Application to Revise Tech Specs to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements - EPID L-2020-LLA-0212 ML20267A5162020-09-23023 September 2020 NRR E-mail Capture - Columbia Generating Station - Final - Request for Additional Information - Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-09 - EPID L-2020-LLR-0068 ML20265A3242020-09-20020 September 2020 Email 9-20-2020 - Req_ Kick-Off Call Columbia Generating Station RFI Provided for Roll-Back EP Program Inspection (Week of Nov 2 2020) ML20245E2822020-08-31031 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20239A9702020-08-26026 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20149K4362020-05-26026 May 2020 NRR E-mail Capture - Formal RAIs for Columbia (COVID-19) QA Plan Change Surveillance, Request Response by Tuesday June 2, 2020 ML20136A0112020-05-14014 May 2020 NRR E-mail Capture - Acceptance Columbia Relief Request ISI Reactor Pressure Vessel Feedwater Nozzles, 4ISI-09 ML20112F4572020-04-21021 April 2020 NRR E-mail Capture - Official Release of NRC RAIs for Columbia Covid Exigent Due Friday April 24, 2020 2024-08-01
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24215A3672024-08-0101 August 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station - License Amendment Request to Revise Emergency Plan - EPID L-2024-LLA-0011 ML24169A0402024-06-14014 June 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station (Columbia) - Relief Requests for the Fifth Ten-Year Interval Inservice Testing - EPIDs (L-2024-LLR-007 Through 0013) ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information ML23110A2642023-04-20020 April 2023 Request for Information License Renewal Phase 2 Inspection ML22343A1802022-12-0808 December 2022 February 2023 Emergency Preparedness Program Inspection - Request for Information ML22301A1432022-10-28028 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Adopt TSTF-505 - EPID L-2022-LLA-0023 ML22242A1082022-08-30030 August 2022 Information Request, Information Request, Security IR 2022404 ML22235A1052022-08-22022 August 2022 August 2022 Emergency Preparedness Exercise Inspection Request for Information ML22145A4462022-06-0606 June 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000397/2022401 ML22144A0342022-05-18018 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22041A4572022-02-10010 February 2022 Notification of NRC Design Bases Assurance Inspection (Team) (05000397/2022010) and Request for Information ML21277A3572021-10-12012 October 2021 CGS Brq RFI Letter, Columbia Generating Station - Notification of Inspection (NRC Inspection Report 05000397/2021004) and Request for Information ML21216A0502021-08-0303 August 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia - License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO EPID L-2021-LLA-0259 ML21209A9792021-07-28028 July 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21120A1182021-04-30030 April 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - On-Site Cooling System Sediment Disposal Approval Request - EPID L-2020-LLL-0031 ML21068A2842021-03-0404 March 2021 2021002 Inservice Inspection (ISI) Request for Information (RFI) ML20336A1852020-11-30030 November 2020 NRR E-mail Capture - Final - RAI - Columbia - One -Time Exemption from 10 CFR 73, App B, Sect VI, Subsection C.3.(l)(1) Regarding Annual Force-On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20325A0402020-11-19019 November 2020 NRR E-mail Capture - Draft - RAI - Columbia - One -Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force -On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20267A5162020-09-23023 September 2020 NRR E-mail Capture - Columbia Generating Station - Final - Request for Additional Information - Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-09 - EPID L-2020-LLR-0068 ML20245E2822020-08-31031 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20239A9702020-08-26026 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20149K4362020-05-26026 May 2020 NRR E-mail Capture - Formal RAIs for Columbia (COVID-19) QA Plan Change Surveillance, Request Response by Tuesday June 2, 2020 ML20112F4572020-04-21021 April 2020 NRR E-mail Capture - Official Release of NRC RAIs for Columbia Covid Exigent Due Friday April 24, 2020 ML20034E6082020-02-0303 February 2020 NRR E-mail Capture - RAI Formal Release Columbia TSTF 563 LAR, 30 Day Response Period Due March 3, 2020 ML20028E1512020-01-27027 January 2020 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000397/2020002) and Request for Information ML19267A1842019-09-24024 September 2019 Request for Information for Upcoming Open Phase Condition Inspection at Columbia Generating Station ML19232A2282019-08-20020 August 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Columbia Exigent Amendment - One Electrical RAI, ML19183A4752019-07-0202 July 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Columbia HVAC LAR L-2019-LLA-0034 ML18088A0152018-03-29029 March 2018 Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment Plans (05000397/2018010) and Request for ML17341B0272017-12-0707 December 2017 NRR E-mail Capture - RAI Associated with Columbia Amendment Request Revise Tech Spec 5.5.12 for Permanent Extension of Type a and Type C Containment Testing Frequencies for MF9469, EPID: L-2017-LLA-0197, ILRT, LLRT LAR - New RAI Response Da ML17292A0572017-10-18018 October 2017 NRR E-mail Capture - New RWCU RAI Due Date Now November 24, 2017 ML17249A6882017-09-0606 September 2017 NRR E-mail Capture - RAIs for Columbia Relief Request RAI (MF8925), 3ISI-19 ML17205A3152017-07-20020 July 2017 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000397/2017004) and Request for Information ML17193A2192017-07-12012 July 2017 NRR E-mail Capture - Columbia RWCU LAR MF8318, Formal Release of RAIs ML17144A1702017-05-24024 May 2017 NRR E-mail Capture - NRC RAIs for Columbia Relief Request MF8922, 3ISI-16 ML17047A7492017-02-16016 February 2017 Response to Request for Additional Information, Columbia Mur LAR Evib Rais ML17006A0902017-01-0404 January 2017 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate ML17006A0922017-01-0404 January 2017 NRR E-mail Capture - Eicb RAIs for Columbia Mur ML16356A1382016-12-21021 December 2016 NRR E-mail Capture - Columbia Mur LAR Evib RAIs Non - Proprietary Version - Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate ML16342C4322016-12-0707 December 2016 NRR E-mail Capture - Columbia Measurement Uncertainty Recapture Power Uprate LAR Rais: Human Performance: MF8060, Formal Release for Response on Monday January 9, 2017 ML16327A1842016-11-22022 November 2016 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate ML16323A1192016-11-16016 November 2016 NRR E-mail Capture - Eicb RAIs for Columbia Mur ML16218A3902016-08-0808 August 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action, Request for Measurement Uncertainty Recapture (Mur) Power Uprate (from 3486 Mwt to 3544 Mwt) ML16194A3702016-07-11011 July 2016 Notification of NRC Triennial Heat Sink Performance Inspection 05000397/2016003 and Request for Information ML16069A3592016-03-0909 March 2016 NRR E-mail Capture - Second Round Rais: Columbia MF6042 LAR TSTF-425 ML16061A5542016-03-0101 March 2016 Notification of NRC Design Bases Inspection (05000397/2016007) and Initial Request for Information ML16061A5662016-03-0101 March 2016 Notification of Design Bases Inspection (Programs)(Inspection Report 05000397/2016008) and Initial Request for Information ML15254A2572015-09-16016 September 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1 Seismic Reevaluations ML15215A0432015-08-18018 August 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Reevaluations 2024-08-01
[Table view] |
Text
NRR-PMDAPEm Resource From: Klos, John Sent: Wednesday, July 12, 2017 8:58 AM To: Williams, Lisa L.
Cc: Klos, John
Subject:
Columbia RWCU LAR , MF8318, formal release of RAIs Importance: High
- Lisa, By letter dated August 30, 2016 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML16243A515), Energy Northwest (the licensee) submitted a License Amendment Request (LAR) for Columbia Generating Station, which requested approval to revise the Quality Group designation for the piping, valves, pumps and mechanical modules located in low temperature portions of the reactor water cleanup (RWCU) system located in the radwaste building from Quality Group C to Quality Group D.
The NRC staff has reviewed the LAR and has identified areas where additional information is needed to complete its review. Clarification calls were held on June 1, 2017, June 20, 2017 and July 6, 2017 that developed the final set of questions below which require no further clarification. These RAIs are now released formally with a 75 calendar day response time; thereby, these RAIs are due September 25, 2017.
RAI1:
RG 1.26 establishes an acceptable method for complying with requirements of GDC 1 and 10 CFR 50.55a by classifying fluid systems and components important to safety and applying corresponding quality codes and standards to such systems and components. This RG describes an acceptable method for determining quality standards for Quality Group B, C, and D water- and steam-containing components important to safety of water-cooled nuclear power plants.
Columbia FSAR Section 3.2.2 states that the Quality Group classifications indicated in Tables 3.2-1 and 3.2-2 meet the requirements of 10 CFR 50.55a and Regulatory Guide 1.26, Revision 3. Table 3.2-2 shows that Quality Group C corresponds to ASME Section III, Class 3 equipment designed to Subsections NA and ND for piping, valves, and pressure vessels. Table 3.2-2 also shows that the design standards for Quality Group D components are ASME B31.1 for piping and valves, and ASME Boiler and Pressure Vessel Code,Section VIII, Division 1, for pressure vessels.
As specified in 10 CFR 50.55a(g)(4), components (including supports) that are classified as ASME Code Class 1, Class 2, and Class 3 must meet the requirements, except design and access provisions and preservice examination requirements, set forth in Section XI of the ASME Boiler and Pressure Vessel Code (BPVC) to the extent practical within the limitations of design, geometry, and materials of construction of the components. As stated in the Enclosure to the Energy Northwest letter dated February 4, 2016, (ADAMS Accession No. ML16035A405) the applicable ASME Section XI Code Edition and Addenda for Columbias fourth ten-year inservice inspection interval ending December 12, 2025, is the 2007 Edition through the 2008 Addenda.
The applicable requirements of Section XI of the ASME BPVC include inservice examination and repair and replacement criteria. The repair and replacement criteria of Subsection IWA apply to all ASME Class 3 components. The examination requirements of Subsection IWD applied to all ASME Class 3 pressure-retaining components and their integral attachments on Class 3 systems in support of certain functions, including emergency core cooling and containment heat removal. These requirements are not applicable to Quality Group D components and are not included in the ASME B31.1 code.
1
As stated in the license amendment request, Columbias RWCU system was originally designed fully compliant with Regulatory Guide 1.26, Revision 3 guidance. Regulatory Position C.2.c of RG 1.26 specified that water-containing components not part of the reactor coolant pressure boundary or included in Quality Group B, but part of systems or portions of systems that are connected to the reactor coolant pressure boundary and are capable of being isolated from that boundary during all modes of normal reactor operation by two valves, each of which is either normally closed or capable of automatic closure, should be designated Quality Group C.
The staff did not identify any discussion of the effect of the proposed quality group classification change on 10CFR50.55a implementation in the amendment request. As described above, the change in Quality Group could remove the requirement for inservice examination of pressure retaining components and their integral attachments and would remove the repair and replacement criteria currently required to be applied to Quality Group C components, thereby potentially increasing the probability of pressure boundary failure. Provide a discussion addressing changes in application of 10 CFR 50.55a(g)(4) requirements applicable to components classified Quality Class C that would result from the proposed reclassification as Quality Class D components.
This discussion should address the following:
- Describe any adverse results of past required inservice examinations that resulted in repair or replacement activities. In the event that the Quality Group C RWCU system components have been excluded from inservice examination under Subsection IWD of the ASME BPVC, provide justification for the exclusion.
- Provide an appropriate administrative means of controlling future examination, repair, and replacement activities affecting the high-pressure portion of the RWCU system proposed for classification as Quality Group D, such as a license condition, or justify the relaxation based on an a risk-informed assessment if the potential for containment bypass. The voluntary process outlined in 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, provides an acceptable alternative for compliance with the requirements of 10 CFR 50.55a(g).
RAI 2
Section 3.2 of the Columbia Final Safety Analysis Report (FSAR) states that Quality Class II+ corresponds to augmented quality and involves the assignment of qualities affecting activities as specifically committed. The staff identified no discussion of any augmented qualities applicable to the components proposed for downgrading to Quality Group D other than extension of the high energy line classification to RWCU piping in the radwaste building meeting the pressure criteria for high energy lines. Explain the effect of including the components proposed for reclassification as a high energy line with respect to the quality class designation of the components. As appropriate, describe the components and associated attributes that would be subject to augmented quality and designation as Quality Class II+, as described in Section 3.2 of the Columbia FSAR.
Clarify the components of the RWCU system within the radwaste building that are currently designated Quality Class II+ (e.g., resin backwash line) and provide the basis for the augmented quality class relative to the high pressure Quality Class II piping.
RAI 3
Section 4.1.10 of Attachment 1 to the LAR described that originally 39 valves (31 fully replaced and 8 with valve internal-only modifications) were changed from the original Quality Group C to Quality Group D.
However, 2 of these fully-replaced valves were restored back to their original Quality Group C classification.
Please provide the technical basis for returning 2 valves back to the Quality Group C classification. If degradation or damage to the Quality Group D component contributed to returning the component to Quality Group C, describe the degraded condition and the cause of the degradation.
Thank you, John Klos DORL Callaway, Columbia Project Manager 2
U.S. NRC, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing, O9D09 NRC/NRR/DORL/LPL4, MS O9E3 Washington, DC 20555-0001 301.415.5136, 301.415.2102 (fax)
John.Klos@NRC.gov 3
Hearing Identifier: NRR_PMDA Email Number: 3602 Mail Envelope Properties (d9c4f1e07f7b49d8ba085d1add32ac48)
Subject:
Columbia RWCU LAR , MF8318, formal release of RAIs Sent Date: 7/12/2017 8:58:10 AM Received Date: 7/12/2017 8:58:11 AM From: Klos, John Created By: John.Klos@nrc.gov Recipients:
"Klos, John" <John.Klos@nrc.gov>
Tracking Status: None "Williams, Lisa L." <llwilliams@energy-northwest.com>
Tracking Status: None Post Office: HQPWMSMRS02.nrc.gov Files Size Date & Time MESSAGE 7724 7/12/2017 8:58:11 AM Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: