| issue date = 08/26/1988
| issue date = 08/26/1988
| title = Revised Emergency Plan Implementing Procedures,Including Rev 1 to SC-321, Mgt of Emergency Off-Site Radiation Survey Teams & Rev 27 to SC-410, Insp of Emergency Equipment.
| title = Revised Emergency Plan Implementing Procedures,Including Rev 1 to SC-321, Mgt of Emergency Off-Site Radiation Survey Teams & Rev 27 to SC-410, Insp of Emergency Equipment.
| author name = MEYER T A
| author name = Meyer T
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ROCHESTER GASANDELECPICCORPORATION GINNASTATIONCONTROLLED COPYNUMBERoU6INNASTATIONUNIT¹'ICOMP(HIEDDATE:-TIME:-PROCEDURE NO.SC-321REV.NO.1MANAGEMENT OFEMERGENCY OFF-SITERADIATION SURVEYTEAMSTECHNICAL REVIEWPORCREVIEWDATELANTSUPERINTE EFFECTIVE DATEQAXNON-QACATEGORY1.0REVIEWEDBY:THISPROCEDURE CONTAINS2PAGES880'P080410 880886PDRADOCK.05000244IFPDRg
{{#Wiki_filter:6INNA STATION UNIT ¹'I ROCHESTER GAS AND ELEC  PIC CORPORATION      COMP( HIED GINNA STATION                DATE:-
'e SC-3?1:1SC-321MANAGI%ENT OFEMERGENCY OFF-SITERADIATION SURVEYTEAMS1.0PURPOSE:Theob)ective oftheoff-siteradiation surveyteamdirectoristoobtainmeaningful plumeinformation inatimelymanner.Thisprocedure providesguidanceforthesurveyteamdirectortoefficiently managethesurveyteamsinthecollection ofplumeinformation.
CONTROLLED COPY NUMBER    oU          TIME:-
2'
PROCEDURE NO.       SC-321                        REV. NO. 1 MANAGEMENT OF EMERGENCY    OFF-SITE RADIATION SURVEY TEAMS TECHNICAL REVIEW PORC REVIEW DATE LANT SUPERINTE EFFECTIVE DATE QA  X    NON-QA            CATEGORY 1.0 REVIEWED BY:
THIS  PROCEDURE CONTAINS      2  PAGES 880'P080410 880886 PDR  ADOCK. 05000244  I F                PDR g
 
'e SC-3? 1: 1 SC-321 MANAGI%ENT OF EMERGENCY OFF-SITE RADIATION SURVEY TEAMS
 
==1.0 PURPOSE==
The  ob)ective of the off-site radiation survey team director is to obtain meaningful plume information in a timely manner. This procedure provides guidance for the survey    team  director  to efficiently manage the survey  teams  in the  collection of plume information.
2 '          


==REFERENCES:==
==REFERENCES:==


F12'2'SC-323,Emergency Off-SiteRadiation SurveyTeamsSC-420,Estimating Off-SiteDosesSC-442,Monitoring SiteRadiation LevelbyTLDINSTRUCTIONS:
F 1            SC-323, Emergency     Off-Site Radiation Survey Teams 2 '            SC-420,   Estimating Off-Site Doses 2 '            SC-442,   Monitoring Site Radiation Level by TLD INSTRUCTIONS:
3.1.1Directing teamspriortorelease.Directteamstocompleteprimarysurveyroutes.Thiswillallowtheteamstocheckoutequipment andput,outadditional TLDsatlocations asdescribed inprocedure SC-442,TableZZZ,orotherlocations asdesired.3~1.2Positionteamsdownwindatthreedifferent distances fromtheplant.Thismight,beatone,threeandfivemiles.Haveteamssurveybackandforthacrosstheareawheretheplumewouldbeexpectedifareleaseoccurred.
Directing teams prior to release.
3.1.33.1.43.23.2'Informteamsofthepro)ected locationofthecenter-lineoftheplumeandthewindspeedanddirection.
3.1.1          Direct teams to complete primary survey routes. This will allow the teams to check      out equipment and put, out additional TLDs at locations as described in procedure SC-442, Table ZZZ, or other locations as desired.
Obtainnamesofteammembersandobtainexposurehistoryforthecurrentcalendarquarter.Directing teamsduringarelease.Informteamswhenreleasebeginsandtheirlocationinrelationoftheplumecenterline.
3   1.2        Position teams downwind at three different distances from the plant. This might, be at one, three and five
Tellwhatthepro)ected doseratesareattheplumecenterline.  
  ~
~l SC-321:2XnfanduseofKZ.nformteamsastoneedforrespiratory tt'roecsonPositionteamsdownwindatthreedifferent distances fromtheplant.Thismightbeatone,twoandfiveDirectteamstodoaprofileoftheplumeafteritarrives.Theyshouldbedirectedtodriveacrosstheplumetodetermine thewidthandthemaximumreading(centerline),
miles. Have teams survey back and forth across the area where the plume would be expected occurred.
recording doseratesevery1/10miles.Moreprofilesoftheplumearemadeasnecessary toputtheplumelocationonthemap.Direcrectteamstotakeanairsample(approximately 10minutes)attheplumecenterline.
if a  release
Maintainrecordofdosetosurveyteammembers.Zfteamsneedreliefformeals,etc.,relieveoneteamatatimeonarotatingbasis.Teamsonstandbyshouldbelocatedinlowbackground areas.
: 3. 1.3        Inform teams of the pro)ected location of the center-line of the plume and the wind speed and direction.
T1 GIN!SASTATIONUNIT0lCOMPLETED DAVE:-TlME:-ROCHESTER GASANDELECTRICCORPORATION GINNASTATIONCONTROLLED COPYNUMBERPROCEDURE NO.SC-322REV.NO.MANNINGTHEEMERGENCY SURVEYCENTERTECHNICAL REVIEWPORCREVIEWDATESEP223988PLANTUPERINTENDENT SEP271988EFFECTIVE DATEQA~NON-QACATEGORY1.0REVIEWEDBY:TNZSPROCEDURE CONTAINS4PAGES
: 3. 1.4        Obtain names of team members and obtain exposure history for the current calendar quarter.
3.2           Directing teams during a release.
3.2 '          Inform teams when release begins and their location in relation of the plume centerline. Tell what the pro)ected dose rates are at the plume centerline.
 
~l SC-321:2 nform teams as Xnf and use of KZ.
to  need for respiratory      tec t'ro son Position teams downwind at three different distances from the plant. This might be at one, two and five Direct teams to do a profile of the plume after it arrives. They should be directed to drive across the plume to determine the width and the maximum reading (centerline), recording dose rates every 1/10 miles.
More profiles of the plume are made as necessary to put the plume location on the map.
rect teams to take an air sample (approximately 10 Direc minutes) at the plume centerline.
Maintain record of dose to survey team members.
Zf teams need relief for meals, etc., relieve one team at a time on a rotating basis.
Teams on standby should be located in low background areas.
 
T1 GIN!SA STATION ROCHESTER GAS AND ELECTRIC CORPORATION UNIT 0 l COMPLETED                            GINNA STATION DAVE:-                         CONTROLLED COPY NUMBER TlME:-
PROCEDURE NO.       SC-322                        REV. NO.
MANNING THE EMERGENCY SURVEY CENTER TECHNICAL REVIEW PORC REVIEW DATE            SEP 2 2 3988 PLANT  UPERINTENDENT SEP 2 7 1988 EFFECTIVE DATE QA  ~     NON-QA            CATEGORY 1.0 REVIEWED BY:
TNZS PROCEDURE CONTAINS      4  PAGES
 
SC-322:1 SC-322 MANNING THE EMERGENCY SURVEY CENTER 1.0      PURPOSE The purpose of this procedure is to designate individ-uals who should report to the Emergency Survey Center for an Alert level or greater event. These personnel will  assist the TSC and OSC with emergency functions.


SC-322:1SC-322MANNINGTHEEMERGENCY SURVEYCENTER1.0PURPOSEThepurposeofthisprocedure istodesignate individ-ualswhoshouldreporttotheEmergency SurveyCenterforanAlertlevelorgreaterevent.Thesepersonnel willassisttheTSCandOSCwithemergency functions.
==2.0    REFERENCES==
2.02.
2.1    SC-323, Emergency    Off Site Radiation Survey Teams 2.2      SC-324, Emergency On Site Radiation Survey Teams 3  '      INSTRUCTIONS:
3  ~ 1  During normal working hours (or    if  on site) the following persons report directly to the Emergency Survey Certter upon announcement    of an  Alert level or greater.
: 1. Quality Control Personnel
: 2. Designated Survey  Team Members  per SC-600 3.2      Upon  Arrival at the  Emergency Survey Center 3~2~1    Assure Emergency Survey Center      is  open 3.2 '    Obtain appropriate tag from Survey Center Tag Board and Log name under tag. Tag instruction found in Attachment I ~
3 ' '    Sign out a TLD.
3 ' '    Sign out  a self reading pocket dosimeter.
3 '      During  off duty  hours,    individuals    will be called to report to Ginna Station.        You may    report directly to the Emergency Survey Center and        proceed with Step 3.2 above.
3.4      SURVEY CENTER MANAGER OR ASSISTANT 3 ~  4~1 Check out high range survey    instrument.


==12.2REFERENCES==
SC-322:2 3.4.2   Insure both radios in the Survey Center Manager's Office are  ON.
:
3 '.3   Conduct radi'ological survey of basement, areas exterior to the building.
SC-323,Emergency OffSiteRadiation SurveyTeamsSC-324,Emergency OnSiteRadiation SurveyTeams3'INSTRUCTIONS:
auditorium  and 3 '.4  If dose rate is greater than 50 mRem/hr advise emergency coordinator and make arrangements to relocate after survey teams are dispatched.
3~13.23~2~13.2'Duringnormalworkinghours(orifonsite)thefollowing personsreportdirectlytotheEmergency SurveyCertteruponannouncement ofanAlertlevelorgreater.1.QualityControlPersonnel 2.Designated SurveyTeamMembersperSC-600UponArrivalattheEmergency SurveyCenterAssureEmergency SurveyCenterisopenObtainappropriate tagfromSurveyCenterTagBoardandLognameundertag.Taginstruction foundinAttachment I~3''3''3'SignoutaTLD.Signoutaselfreadingpocketdosimeter.
3.4.5  Take an  air  sample and determine fied activity is greater than      1 activit~.
Duringoffdutyhours,individuals willbecalledtoreporttoGinnaStation.YoumayreportdirectlytotheEmergency SurveyCenterandproceedwithStep3.2above.3.4SURVEYCENTERMANAGERORASSISTANT 3~4~1Checkouthighrangesurveyinstrument.  
x 10  "
If unidenti-uci/cc, advise emergency  coordinator.
3.4.6  Start constant air monitor in operation.
P 3.5    Assist survey teams to organize and prepare for dispatch.
3 ~ 5~1 Obtain weather data from Control Room and advise survey teams of projected location of the plume.
3.5 '  Maintain a log of events as regards Survey Center opera-tions.
                                                                  ~ ~
3 ' '  Maintain  a  record of  all survey team samples and insure samples are properly marked and stored.
3 '    Notify Security at SAS of    TSC members  (by name) who  will need access to the site.
3.6 '  Advise those going to the  TSC  of  dose rates  in the area.


3.4.2SC-322:2InsurebothradiosintheSurveyCenterManager's OfficeareON.3'.33'.43.4.53.4.63.53~5~13.5'3''3'3.6'Conductradi'ological surveyofbasement, auditorium andareasexteriortothebuilding.
SC-322:3 ATTACHMENT I TO  SC-322 TAG BOARD ASSIGNMENTS Emergency Survey Center Manager Log Name on Tag Board                                REVERSE SIDE Follow procedure SC-322                              BLANK Emergency Survey Center Communicator Report to Survey Center Manager                    REVERSE SIDE BLANK On-Site Survey  Team  Blue Obtain Blue Foot locker                            REVERSE SIDE Follow procedure SC-324                              BLANK found inside foot locker On-Site Survey  Team  Yellow Obtain Yellow Foot locker                          REVERSE SIDE Follow procedure SC-324                            BLANK found inside foot locker Spare Survey Team White Report to Survey Center                            REVERSE SIDE Manger BLANK Obtain a dosimeter Follow procedure SC-323 and  324 found inside foot locker Standby  in Survey Center Off-Site Survey  Team Green Obtain Green  foot locker                          REVERSE SIDE Follow procedure SC-323                            BLANK Found  inside foot locker
Ifdoserateisgreaterthan50mRem/hradviseemergency coordinator andmakearrangements torelocateaftersurveyteamsaredispatched.
Takeanairsampleanddetermine activit~.
Ifunidenti-fiedactivityisgreaterthan1x10"uci/cc,adviseemergency coordinator.
Startconstantairmonitorinoperation.
PAssistsurveyteamstoorganizeandpreparefordispatch.
ObtainweatherdatafromControlRoomandadvisesurveyteamsofprojected locationoftheplume.MaintainalogofeventsasregardsSurveyCenteropera-tions.~~Maintainarecordofallsurveyteamsamplesandinsuresamplesareproperlymarkedandstored.NotifySecurityatSASofTSCmembers(byname)whowillneedaccesstothesite.AdvisethosegoingtotheTSCofdoseratesinthearea.


ATTACHMENT ITOSC-322SC-322:3TAGBOARDASSIGNMENTS Emergency SurveyCenterManagerLogNameonTagBoardFollowprocedure SC-322REVERSESIDEBLANKEmergency SurveyCenterCommunicator ReporttoSurveyCenterManagerOn-SiteSurveyTeamBlueObtainBlueFootlockerFollowprocedure SC-324foundinsidefootlockerOn-SiteSurveyTeamYellowObtainYellowFootlockerFollowprocedure SC-324foundinsidefootlockerSpareSurveyTeamWhiteReporttoSurveyCenterMangerObtainadosimeter REVERSESIDEBLANKREVERSESIDEBLANKREVERSESIDEBLANKREVERSESIDEBLANKFollowprocedure SC-323and324foundinsidefootlockerStandbyinSurveyCenterOff-SiteSurveyTeamGreenObtainGreenfootlockerFollowprocedure SC-323FoundinsidefootlockerREVERSESIDEBLANK
SC-322:4 Off-Site Survey  Team Red Obtain Red  foot locker                          REVERSE SIDE Follow procedure SC-323                          BLANK found irside foot locker Off-Site Survey  Team Orange Obtain Orange  Foot locker                      REVERSE SIDE Follow procedure SC-323                          BLANK found inside foot locker


Off-SiteSurveyTeamRedObtainRedfootlockerFollowprocedure SC-323foundirsidefootlockerOff-SiteSurveyTeamOrangeObtainOrangeFootlockerFollowprocedure SC-323foundinsidefootlockerSC-322:4REVERSESIDEBLANKREVERSESIDEBLANK 0'}}
0'}}

Latest revision as of 12:27, 4 February 2020

Revised Emergency Plan Implementing Procedures,Including Rev 1 to SC-321, Mgt of Emergency Off-Site Radiation Survey Teams & Rev 27 to SC-410, Insp of Emergency Equipment.
ML17251A255
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/26/1988
From: Meyer T
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17251A256 List:
References
PROC-880826, NUDOCS 8809080410
Download: ML17251A255 (16)


Text

6INNA STATION UNIT ¹'I ROCHESTER GAS AND ELEC PIC CORPORATION COMP( HIED GINNA STATION DATE:-

CONTROLLED COPY NUMBER oU TIME:-

PROCEDURE NO. SC-321 REV. NO. 1 MANAGEMENT OF EMERGENCY OFF-SITE RADIATION SURVEY TEAMS TECHNICAL REVIEW PORC REVIEW DATE LANT SUPERINTE EFFECTIVE DATE QA X NON-QA CATEGORY 1.0 REVIEWED BY:

THIS PROCEDURE CONTAINS 2 PAGES 880'P080410 880886 PDR ADOCK. 05000244 I F PDR g

'e SC-3? 1: 1 SC-321 MANAGI%ENT OF EMERGENCY OFF-SITE RADIATION SURVEY TEAMS

1.0 PURPOSE

The ob)ective of the off-site radiation survey team director is to obtain meaningful plume information in a timely manner. This procedure provides guidance for the survey team director to efficiently manage the survey teams in the collection of plume information.

2 '

REFERENCES:

F 1 SC-323, Emergency Off-Site Radiation Survey Teams 2 ' SC-420, Estimating Off-Site Doses 2 ' SC-442, Monitoring Site Radiation Level by TLD INSTRUCTIONS:

Directing teams prior to release.

3.1.1 Direct teams to complete primary survey routes. This will allow the teams to check out equipment and put, out additional TLDs at locations as described in procedure SC-442, Table ZZZ, or other locations as desired.

3 1.2 Position teams downwind at three different distances from the plant. This might, be at one, three and five

~

miles. Have teams survey back and forth across the area where the plume would be expected occurred.

if a release

3. 1.3 Inform teams of the pro)ected location of the center-line of the plume and the wind speed and direction.
3. 1.4 Obtain names of team members and obtain exposure history for the current calendar quarter.

3.2 Directing teams during a release.

3.2 ' Inform teams when release begins and their location in relation of the plume centerline. Tell what the pro)ected dose rates are at the plume centerline.

~l SC-321:2 nform teams as Xnf and use of KZ.

to need for respiratory tec t'ro son Position teams downwind at three different distances from the plant. This might be at one, two and five Direct teams to do a profile of the plume after it arrives. They should be directed to drive across the plume to determine the width and the maximum reading (centerline), recording dose rates every 1/10 miles.

More profiles of the plume are made as necessary to put the plume location on the map.

rect teams to take an air sample (approximately 10 Direc minutes) at the plume centerline.

Maintain record of dose to survey team members.

Zf teams need relief for meals, etc., relieve one team at a time on a rotating basis.

Teams on standby should be located in low background areas.

T1 GIN!SA STATION ROCHESTER GAS AND ELECTRIC CORPORATION UNIT 0 l COMPLETED GINNA STATION DAVE:- CONTROLLED COPY NUMBER TlME:-

PROCEDURE NO. SC-322 REV. NO.

MANNING THE EMERGENCY SURVEY CENTER TECHNICAL REVIEW PORC REVIEW DATE SEP 2 2 3988 PLANT UPERINTENDENT SEP 2 7 1988 EFFECTIVE DATE QA ~ NON-QA CATEGORY 1.0 REVIEWED BY:

TNZS PROCEDURE CONTAINS 4 PAGES

SC-322:1 SC-322 MANNING THE EMERGENCY SURVEY CENTER 1.0 PURPOSE The purpose of this procedure is to designate individ-uals who should report to the Emergency Survey Center for an Alert level or greater event. These personnel will assist the TSC and OSC with emergency functions.

2.0 REFERENCES

2.1 SC-323, Emergency Off Site Radiation Survey Teams 2.2 SC-324, Emergency On Site Radiation Survey Teams 3 ' INSTRUCTIONS:

3 ~ 1 During normal working hours (or if on site) the following persons report directly to the Emergency Survey Certter upon announcement of an Alert level or greater.

1. Quality Control Personnel
2. Designated Survey Team Members per SC-600 3.2 Upon Arrival at the Emergency Survey Center 3~2~1 Assure Emergency Survey Center is open 3.2 ' Obtain appropriate tag from Survey Center Tag Board and Log name under tag. Tag instruction found in Attachment I ~

3 ' ' Sign out a TLD.

3 ' ' Sign out a self reading pocket dosimeter.

3 ' During off duty hours, individuals will be called to report to Ginna Station. You may report directly to the Emergency Survey Center and proceed with Step 3.2 above.

3.4 SURVEY CENTER MANAGER OR ASSISTANT 3 ~ 4~1 Check out high range survey instrument.

SC-322:2 3.4.2 Insure both radios in the Survey Center Manager's Office are ON.

3 '.3 Conduct radi'ological survey of basement, areas exterior to the building.

auditorium and 3 '.4 If dose rate is greater than 50 mRem/hr advise emergency coordinator and make arrangements to relocate after survey teams are dispatched.

3.4.5 Take an air sample and determine fied activity is greater than 1 activit~.

x 10 "

If unidenti-uci/cc, advise emergency coordinator.

3.4.6 Start constant air monitor in operation.

P 3.5 Assist survey teams to organize and prepare for dispatch.

3 ~ 5~1 Obtain weather data from Control Room and advise survey teams of projected location of the plume.

3.5 ' Maintain a log of events as regards Survey Center opera-tions.

~ ~

3 ' ' Maintain a record of all survey team samples and insure samples are properly marked and stored.

3 ' Notify Security at SAS of TSC members (by name) who will need access to the site.

3.6 ' Advise those going to the TSC of dose rates in the area.

SC-322:3 ATTACHMENT I TO SC-322 TAG BOARD ASSIGNMENTS Emergency Survey Center Manager Log Name on Tag Board REVERSE SIDE Follow procedure SC-322 BLANK Emergency Survey Center Communicator Report to Survey Center Manager REVERSE SIDE BLANK On-Site Survey Team Blue Obtain Blue Foot locker REVERSE SIDE Follow procedure SC-324 BLANK found inside foot locker On-Site Survey Team Yellow Obtain Yellow Foot locker REVERSE SIDE Follow procedure SC-324 BLANK found inside foot locker Spare Survey Team White Report to Survey Center REVERSE SIDE Manger BLANK Obtain a dosimeter Follow procedure SC-323 and 324 found inside foot locker Standby in Survey Center Off-Site Survey Team Green Obtain Green foot locker REVERSE SIDE Follow procedure SC-323 BLANK Found inside foot locker

SC-322:4 Off-Site Survey Team Red Obtain Red foot locker REVERSE SIDE Follow procedure SC-323 BLANK found irside foot locker Off-Site Survey Team Orange Obtain Orange Foot locker REVERSE SIDE Follow procedure SC-323 BLANK found inside foot locker

0'