{{#Wiki_filter:GINNA STATION TRIVl Revision 0 TECH ICAL REQUIR MENTS MANUAL (T)R sponsible Manager Eff tive Oate N/p~Controlled Copy Ho.~~/96040101S9 960224 PDR ADOCK 05000244 P P DFt  
{{#Wiki_filter:GINNA STATION               TRIVl Revision 0 TECH ICAL REQUIR MENTS MANUAL (T       )
R sponsible Manager Eff tive Oate N
                                                                  /p ~
Controlled Copy Ho. ~ ~ /
96040101S9 960224 PDR ADOCK 05000244 P             P DFt


List of Effective Pages (TAM)Pa e Rev.TOC Pa e Rev..Section 3.4 Pa e Rev.Pa e Rev~Section 1.0 TRH 1.0-1 Section 2.0 ,TRH 2.0-1 Section 3.0 TRH 3.0-1 Section 3.1 TRH 3.1-1 TRH 3.1-2 TRM 3.1-3 TRH 3.1-4 TRH 3.1-5 TRM 3.1-6 TRM 3.1-7 TRH 3.1-8 TRH 3.1-9 Section 3.2 TRH 3.2-1 Section 3.3 TRH 3.3-1 TRH 3.3-P TRH 3.3-3 TRH 3.3-4 TRM 3.3-5 TRH 3.3-6 TRM 3.4-1 TRM 3.4-2 TRM 3.4-3 TRM 3.4-4 TRH 3.4-5 TRH 3.4-6 TRM 3.4-7 Section 3.5 TRH 3.5-1 Section 3.6 TRH 3.6-1 Section 3.7 TRH 3.7-1 Section 3.8 TRH 3.8-1 TRH 3.8-'2 TRH 3.8-3 Section 3.9 TRM 3.9-1 TRH 3.9-2 TRM 3.9-3 TRH 3,9-4 0 0 0 0'0 0 0 ip 0 0 0-LEP-i  
List of Effective Pages (TAM)
Pa e       Rev. Pa e       Rev.       Pa e       Rev. Pa e Rev ~
TOC          .Section 3.4 TRM  3.4-1         0 TRM  3.4-2          0 Section 1.0    TRM  3.4-3          0 TRM  3.4-4          0 TRH   1.0-1       TRH  3.4-5        '0 TRH  3.4-6          0 Section 2.0   TRM  3.4-7          0
,TRH 2.0-1             Section 3.5 Section 3.0   TRH  3.5-1 TRH 3.0-1             Section 3.6 Section 3. 1 TRH   3.6-1        ip TRH  3.1-1             Section 3.7 TRH 3.1-2 TRM 3.1-3         TRH  3.7-1 TRH 3.1-4 TRH 3.1-5             Section 3.8 TRM 3.1-6 TRM 3.1-7         TRH   3.8-1         0 TRH 3.1-8        TRH  3.8-'2       0 TRH 3.1-9        TRH   3.8-3         0-Section 3.2        Section 3.9 TRH 3.2-1        TRM   3.9-1 TRH  3.9-2 Section 3.3   TRM   3.9-3 TRH   3,9-4 TRH  3.3-1 TRH  3.3-P TRH  3.3-3 TRH   3.3-4 TRM  3.3-5 TRH   3.3-6 LEP-i


TABLE OF CONTENTS 1.0 2.0 3.0 3.0 3.1 3.1.1 3.1.2 3.1.3 3.2 3.3 3.3,1 3.3.2 3.3.3 3.4 3.4.1 3.4.2 3.5 3.6 USE ANO APPLICATION SAFETY LIHITS (SLs)LIMITING CONDITION FOR OPERATION (LCO)APPLICABILITY SURVEILLANCE RE(UIREMENT (SR)APPLICABILITY REACTIVITY CONTROL SYSTEMS.Boron Injection System-MODES 1, 2, 3, and Boron Injection System-HOOES 5 and 6 Rod Group Alignment Limits Safety Analyses Re-Evaluation POWER OISIN'IBUT'ON LIHITS 4 INSTRUMENTATION Control Room Emergency Air Treatment System (CREATS)Instrumentation Circulating Water Flood Protection Instrumentation
TABLE OF CONTENTS 1.0       USE ANO APPLICATION                                                    1.0-1 2.0        SAFETY  LIHITS (SLs)                                                  2.0-1 3.0        LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY                 3.0-1 3.0        SURVEILLANCE RE(UIREMENT (SR) APPLICABILITY                           3.0-1 3.1            REACTIVITY CONTROL SYSTEMS .                                     3.1-1 3.1.1                Boron Injection System MODES 1, 2, 3, and   4              3.1-1 3.1.2                Boron Injection System HOOES 5 and 6                       3.1-6 3.1.3                Rod Group Alignment Limits Safety Analyses Re-Evaluation                                               3.1-8 3.2            POWER OISIN'IBUT'ON LIHITS                                     3.2-1 3.3            INSTRUMENTATION                                                 3.3-1 3.3,1              Control Room Emergency   Air Treatment System (CREATS)
.Movable In-Core Instrumentation REACTOR COOLANT SYSTEH (RCS)Reactor Vessel Head Vents RCS Chemistry EMERGENCY CORE COOLING SYSTEHS (ECCS)CONTAINMENT SYSTEHS 1.0-1 2.0-1 3.0-1 3.0-1 3.1-1 3.1-1 3.1-6 3.1-8 3.2-1 3.3-1 3.3-1 3.3-3 3.3-6 3.4-1 3.4-1 3.4-3 3.5-I 3.'6-1 3.7 PLANT SYSTEMS I~~3.7-1 3.8 3.8.1 3.8.2 3~9 3,9.1 3.9.2 3,9.3 ELECTRICAL POWER SYSTEHS Offsite Power Sources Diesel Generator (OG)Load Sequencer.REFUELING OPERATIONS Fuel Storage in Spent Fuel Pool (SFP)Region Fuel Assembly Hovement in Auxiliary Building Refueling Hanipulator Crane Interlocks
Instrumentation                                             3.3-1 3.3.2              Circulating Water Flood Protection Instrumentation        . 3.3-3 3.3.3               Movable In-Core Instrumentation                              3.3-6 3.4            REACTOR COOLANT SYSTEH (RCS)                                      3.4-1 3.4.1              Reactor Vessel Head Vents                                    3.4-1 3.4.2              RCS Chemistry                                                3.4-3 3.5            EMERGENCY CORE COOLING SYSTEHS    (ECCS)                          3.5-I 3.6            CONTAINMENT SYSTEHS                                              3.'6-1 3.7             PLANT SYSTEMS                         I ~ ~                     3.7-1 3.8             ELECTRICAL POWER SYSTEHS                                        3.8-1 3.8.1                Offsite  Power Sources                                    3.8-1 3.8.2               Diesel Generator   (OG) Load Sequencer .                   3.8-2 3 9
,~~~2~~~3.8-1 3.8-1 3.8-2 3.9-1 3,9-1 3.9-2 3.9-4 M%%RtJKK JRR~SGinna Station TRM Revision 0  
  ~            REFUELING OPERATIONS                                   ~ ~  ~  3.9-1 3,9.1                Fuel Storage in Spent Fuel Pool (SFP) Region   2 ~ ~   ~   3,9-1 3.9.2               Fuel Assembly Hovement in Auxiliary Building                3.9-2 3,9.3               Refueling Hanipulator Crane Interlocks ,                    3.9-4 M%%RtJKK JRR~S Ginna  Station   TRM                                                       Revision     0


===3.0 LIHITIHG===
3.0     LIHITIHG COHOITIONS FOR OPERATION (LCO) APPLICABILITY SURVE ILLAHCE REOUIREHEHT (SR) APPLICABILITY The Technical Requirements (TRs) in this manual follow the same LCO applicabi lities as the Improved Technical Specifications with the exception of LCO 3.0.6 which deals solely with ITS LCOs on support/supported system inoperabilities. The Technical Surveillance Requirements (TSRs) in this manual follow the same SR apiplicabilities as the Improved Technical Specifications.
COHOITIONS FOR OPERATION (LCO)APPLICABILITY SURVE ILLAHCE REOUIREHEHT (SR)APPLICABILITY The Technical Requirements (TRs)in this manual follow the same LCO applicabi lities as the Improved Technical Specifications with the exception of LCO 3.0.6 which deals solely with ITS LCOs on support/supported system inoperabilities.
The TRs   in this manual also -follow the same organization as the Improved Technical Specifications (e.g., Reactivity Control System requirements are contained in TR Chapter 3,1).
The Technical Surveillance Requirements (TSRs)in this manual follow the same SR apiplicabilities as the Improved Technical Specifications.
Ginna Station TRH                   TRH 3.0-l"                       Revision 0
The TRs in this manual also-follow the same organization as the Improved Technical Specifications (e.g., Reactivity Control System requirements are contained in TR Chapter 3,1).Ginna Station TRH TRH 3.0-l" Revision 0  


ACTIONS continued CONDITION REQUIRED ACTIONS COMPLETION TIHE D.Required Action and associated Completion Time of Condition C not met.D.I Be in MODE 5, 30 hours E.Both boron injection subsystems inoperable.
ACTIONS   continued CONDITION               REQUIRED ACTIONS     COMPLETION TIHE D. Required Action and   D. I     Be in MODE 5,   30 hours associated Completion Time  of Condition C not met.
E.I Enter LCO 3'.3.Immediately Ginna Station TRH TRH 3.1-2 Revision 0 Boron injection System-MODES 5 and 6 IR 3.1.2 3.1 REACTIVITY CONTROL SYSTEMS 3.1,2 Boron Injection System-MODES 5 and 6 TR 3.1.2 One boron injection subsystem shall be OPERABLE.APPLICABILITY:
E. Both boron injection   E. I     Enter LCO 3 '.3. Immediately subsystems inoperable.
MODES 5 and 6.ACTIONS CONDITION RE(VIREO ACTIONS COMPLETION TIHE A.Required boron injection subsystem inoperable.
Ginna Station TRH               TRH  3.1-2                  Revision 0
0*4 A.l Suspend CORE ALTERATIONS.
AND A.2 Suspend positive reactivity changes.AND~*.o A.3 Initiate action to restore required boron injection subsystem to OPERABLE st'atus.Immedi a te1 y Immediately Immediately Ginna Station TRH TRM 3.1-6 Revision 0  


~I I I I~I
Boron  injection  System MODES    5 and 6 IR 3.1.2 3.1    REACTIVITY CONTROL SYSTEMS
: 3. 1,2  Boron  Injection  System MODES        5  and 6 TR  3.1.2          One boron  injection        subsystem  shall  be OPERABLE.
APPLICABILITY:      MODES 5  and 6.
ACTIONS CONDITION                        RE(VIREO ACTIONS                COMPLETION TIHE 0*4 A. Required boron              A.l            Suspend  CORE              Immedi a te1 y injection subsystem                        ALTERATIONS.
inoperable.
AND A.2            Suspend  positive          Immediately reactivity  changes.
AND
                                          ~ * .o A.3            Initiate action to        Immediately restore required boron injection subsystem to OPERABLE st'atus.
Ginna  Station  TRH                    TRM        3.1-6                              Revision  0


C REATS Toxic Ga s Instrumentation lR 3.3.1 3.3 IHSTRUHEHTATION
~ I I II  ~ I


====3.3.1 Control====
C REATS Toxic  Ga s    Instrumentation lR 3.3.1 3.3    IHSTRUHEHTATION 3.3.1     Control Room Emergency Air Treatment System             (CREATS) Toxic     Gas Instrumentation TR   3.3.1               The CREATS actuation instrumentation for each toxic gas Function in Table   TR 3.3. 1- 1 shall be OPERABLE.
Room Emergency Air Treatment System (CREATS)Toxic Gas Instrumentation TR 3.3.1 The CREATS actuation instrumentation for each toxic gas Function in Table TR 3.3.1-1 shall be OPERABLE.APPLICABILITY:
APPLICABILITY:           HOOES 1, 2, 3, 4,   5'and 6.
HOOES 1, 2, 3, 4, 5'and 6.ACTIONS-HOTE-CREATS air intake may be unisolated fnr up to 1 hour per day for fresh air makeup to improve the working environment in the control room.COHO I T ION, RE/VIREO ACTIONS COMPLETION TINE A.One or more toxic gas functions with one channel inoperable, A.I Place CREATS in HOOE F.1 hour SURVEILLANCE RE(jUIREHENTS SURVEILLANCE FRE(UEHCY TSR 3.3.1.1 Perform COT.31 days TSR 3.3.1.2 Perform CHANNEL CALIBRATION.
ACTIONS
)8 months Ginna Station TRH 3.3-1 Revision 0  
                                              -HOTE-CREATS   air intake     may be unisolated   fnr up   to   1 hour per day for fresh       air makeup   to   improve   the working environment   in   the control room.
'Circulating Water Flood Protection Instrumentation TR 3.3.2 3.3 INSTRUHENTATION
COHO I T ION,                   RE/VIREO ACTIONS                 COMPLETION TINE A. One   or more toxic gas         A.I       Place CREATS   in           1  hour functions with one                        HOOE F.
channel inoperable, SURVEILLANCE RE(jUIREHENTS SURVEILLANCE                                         FRE(UEHCY TSR   3.3.1.1       Perform COT.                                             31 days TSR   3.3. 1.2       Perform CHANNEL CALIBRATION.                             )8 months Ginna Station                                 TRH 3.3-1                                   Revision 0


====3.3.2 Circulating====
Circulating Water Flood Protection Instrumentation TR  3.3.2 3.3    INSTRUHENTATION 3.3.2   Circulating   Water Flood Protection Instrumentation TR   3.3.2           The Circulating Water Flood Protection instrumentation for
Water Flood Protection Instrumentation TR 3.3.2 The Circulating Water Flood Protection instrumentation for'each Function in Table TR 3.3.2-I shall he OPERABLE.APPLICABILITY:
                      'each Function in Table TR 3.3.2- I shall he OPERABLE.
HODES I and 2.ACTIONS-NOTE------
APPLICABILITY:       HODES I and 2.
Separate Condition entry is allowed for each set.CONDITION REQUIRED ACTION COHPLET ION T IHE A.One or more Functions with one required channel in one or more set(s)inoperable.
ACTIONS
Initiate action to verify that affected function set is OPERABLE.Immediately B.One or more Functions with two or more required channels per set inoperable.
                                            -NOTE------
B.I Restore set to OPERABLE status.7 days C.One or more Functions wl th both sets inoperable.
Separate   Condition entry is allowed for each set.
C.I Restore at least one set to OPERABLE" status.24 hours D.Required Action and Assn~i~ted Completion Time rut met.D.l Be in MODE 3.6 hours Ginna Station TRH 3.3-3 Revision 0  
CONDITION                       REQUIRED ACTION         COHPLET ION T IHE A. One or more Functions                 Initiate action to    Immediately with   one required                   verify that affected channel in one or more                 function set is set(s) inoperable.                     OPERABLE.
B. One or more Functions       B.I      Restore set to        7  days with two or more                       OPERABLE  status.
required channels per set inoperable.
C. One or more Functions       C.I       Restore at least one   24  hours wl th both sets                        set to OPERABLE inoperable.                        "
status.
D. Required Action and           D.l      Be  in  MODE 3.        6  hours Assn~i~ted Completion Time   rut met.
Ginna   Station                         TRH   3.3-3                         Revision 0


t eactor Vessel fiead Vents TR 3.4.1 3.4 RfACTOR COOLANT SYSTEM (RCS)3.4.1 Reactor Vessel Head Vents TR 3.4.1 Two reactor vessel head vent valves, in one vent flow path, shall be OPERABLE and closed.APPL I CAB IL I TY: 'OOES 1, 2, and 3.'CT IONS CONO I T ION REQUIRED ACTIONS COMPLETION TIHE A.One or more required reactor vessel head vent valves inoperable.
t eactor Vessel fiead Vents TR 3.4.1 3.4   RfACTOR COOLANT SYSTEM (RCS) 3.4.1 Reactor Vessel         Head Vents TR   3.4.1             Two reactor vessel       head vent   valves, in one vent flow path, shall be OPERABLE   and closed.
OR One or more required reactor vessel head vent valves open.-------------NOTE------------
APPL I CAB IL I TY: 'OOES       1, 2, and 3.
LCO 3.0.4 is not applicable.
                                              'CT IONS CONO I T ION                         REQUIRED ACTIONS             COMPLETION TIHE A. One or more required           -------------NOTE------------
Initiate action to close required vent valve(s).A.2 Initiate action to remove motive power I'rom each required vent valve actuator.Immediately Immediately AD 3 Restore required reactor vessel head vent valve(s)to OPfRABLE status.30 days B.Required Actions and associated Completion Time not met.B.l Be in HOOE 3.6 hours B.2 Be in MOOE 4.36 hours Ginna Station TRH TRH 3.4-1 Revision 0  
reactor vessel head            LCO 3.0.4 is not       applicable.
vent valves inoperable.
Initiate action to         Immediately OR                                          close required vent valve(s).
One  or more required reactor vessel      head vent valves open.
A.2           Initiate action   to     Immediately remove motive power I'rom each required vent valve actuator.
AD 3         Restore required           30 days reactor vessel head vent valve(s) to OPfRABLE   status.
B. Required Actions and           B.l           Be in HOOE 3.           6 hours associated Completion Time not met.
B.2           Be in MOOE 4.           36 hours Ginna   Station   TRH                     TRH       3.4-1                           Revision   0


Reactor Vesse)>lead Vents TR 3.4.1 SURVEILLANCE REQUIREHENTS SURVEILLANCE FREQUENCY TSR 3.4.1.1 Verify the required reactor hea'd vent manual isolation valves are locked open.18 months TSR 3.4.1.2 Verify flow through the required reactor vessel head vent path using either liquid or gas.10 monthsGinna Station TRH TRH 3.4-2 Revision 0  
Reactor Vesse) >lead Vents TR 3.4.1 SURVEILLANCE REQUIREHENTS SURVEILLANCE                             FREQUENCY TSR 3.4. 1. 1   Verify the required reactor hea'd vent         18 months manual isolation valves are locked open.
TSR 3.4. 1.2     Verify flow through the required reactor       10 months vessel head vent path using either liquid or gas.
Ginna Station   TRH                   TRH 3.4-2                         Revision   0


===3.7 PLANT===
3.7   PLANT SYSTEHS There are no technical requirements   associated with this Chapter.
SYSTEHS There are no technical requirements associated with this Chapter.I IGinna Station...TRH 3.7-1 Revision 0 V.e l' Refueling Manip Lor Crane interlocks TR 3.9.3'l 3.9 REFUELING OPERAl I ONS 3.9.3 Refueling Manipulator Crane Interlocks TR 3.9.3 The refueling manipulator crane interlocks shall be OPERABLE.APPLICABILITY:
I I
During use nf the refueling manipulator crane with fuel in the vessel.ACTIONS CONDITION REQUIRED ACTION COHPLETION TIHE A.Refuel ing manipul ator crane interlocks inoperable.
Ginna  Station                   ...TRH 3.7-1                     Revision 0
A.I Suspend use of refueling manipulator
 
--crane.Immedi~te 1 y SURVEILLANCE RE(U I REMEN TS SURVEILLANCE FREQUENCY TSR 3.9,3.1 Veri fy the refuel ing manipulator crane interlocks are OPERABLE.Once prior to refueling operations 0 Ginna Station TRH TRH 3.9-: Revision 0}}
V . e l
 
Refueling Manip   Lor Crane   interlocks TR 3.9.3
'l 3. 9 REFUELING OPERAl I ONS 3.9.3   Refueling Manipulator Crane Interlocks TR   3.9.3           The refueling manipulator crane interlocks shall     be OPERABLE.
APPLICABILITY:     During use nf the refueling manipulator crane with fuel in the vessel.
ACTIONS CONDITION                       REQUIRED ACTION           COHPLETION TIHE A. Refuel ing manipul ator     A.I       Suspend use of         Immedi ~ te 1 y crane interlocks                      refueling manipulator inoperable.                        --crane.
SURVEILLANCE RE(U I REMEN TS SURVEILLANCE                               FREQUENCY TSR   3.9,3.1     Veri fy the refuel ing manipulator crane         Once  prior to interlocks are   OPERABLE.                       refueling operations 0 Ginna Station                               3.9-:
TRH                    TRH                                    Revision   0}}

Latest revision as of 10:25, 4 February 2020

Rev 0 to Technical Requirements Manual (Trm).
ML17264A419
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/24/1996
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
References
PROC-960224, NUDOCS 9604010159
Download: ML17264A419 (23)


Text

GINNA STATION TRIVl Revision 0 TECH ICAL REQUIR MENTS MANUAL (T )

R sponsible Manager Eff tive Oate N

/p ~

Controlled Copy Ho. ~ ~ /

96040101S9 960224 PDR ADOCK 05000244 P P DFt

List of Effective Pages (TAM)

Pa e Rev. Pa e Rev. Pa e Rev. Pa e Rev ~

TOC .Section 3.4 TRM 3.4-1 0 TRM 3.4-2 0 Section 1.0 TRM 3.4-3 0 TRM 3.4-4 0 TRH 1.0-1 TRH 3.4-5 '0 TRH 3.4-6 0 Section 2.0 TRM 3.4-7 0

,TRH 2.0-1 Section 3.5 Section 3.0 TRH 3.5-1 TRH 3.0-1 Section 3.6 Section 3. 1 TRH 3.6-1 ip TRH 3.1-1 Section 3.7 TRH 3.1-2 TRM 3.1-3 TRH 3.7-1 TRH 3.1-4 TRH 3.1-5 Section 3.8 TRM 3.1-6 TRM 3.1-7 TRH 3.8-1 0 TRH 3.1-8 TRH 3.8-'2 0 TRH 3.1-9 TRH 3.8-3 0-Section 3.2 Section 3.9 TRH 3.2-1 TRM 3.9-1 TRH 3.9-2 Section 3.3 TRM 3.9-3 TRH 3,9-4 TRH 3.3-1 TRH 3.3-P TRH 3.3-3 TRH 3.3-4 TRM 3.3-5 TRH 3.3-6 LEP-i

TABLE OF CONTENTS 1.0 USE ANO APPLICATION 1.0-1 2.0 SAFETY LIHITS (SLs) 2.0-1 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY 3.0-1 3.0 SURVEILLANCE RE(UIREMENT (SR) APPLICABILITY 3.0-1 3.1 REACTIVITY CONTROL SYSTEMS . 3.1-1 3.1.1 Boron Injection System MODES 1, 2, 3, and 4 3.1-1 3.1.2 Boron Injection System HOOES 5 and 6 3.1-6 3.1.3 Rod Group Alignment Limits Safety Analyses Re-Evaluation 3.1-8 3.2 POWER OISIN'IBUT'ON LIHITS 3.2-1 3.3 INSTRUMENTATION 3.3-1 3.3,1 Control Room Emergency Air Treatment System (CREATS)

Instrumentation 3.3-1 3.3.2 Circulating Water Flood Protection Instrumentation . 3.3-3 3.3.3 Movable In-Core Instrumentation 3.3-6 3.4 REACTOR COOLANT SYSTEH (RCS) 3.4-1 3.4.1 Reactor Vessel Head Vents 3.4-1 3.4.2 RCS Chemistry 3.4-3 3.5 EMERGENCY CORE COOLING SYSTEHS (ECCS) 3.5-I 3.6 CONTAINMENT SYSTEHS 3.'6-1 3.7 PLANT SYSTEMS I ~ ~ 3.7-1 3.8 ELECTRICAL POWER SYSTEHS 3.8-1 3.8.1 Offsite Power Sources 3.8-1 3.8.2 Diesel Generator (OG) Load Sequencer . 3.8-2 3 9

~ REFUELING OPERATIONS ~ ~ ~ 3.9-1 3,9.1 Fuel Storage in Spent Fuel Pool (SFP) Region 2 ~ ~ ~ 3,9-1 3.9.2 Fuel Assembly Hovement in Auxiliary Building 3.9-2 3,9.3 Refueling Hanipulator Crane Interlocks , 3.9-4 M%%RtJKK JRR~S Ginna Station TRM Revision 0

3.0 LIHITIHG COHOITIONS FOR OPERATION (LCO) APPLICABILITY SURVE ILLAHCE REOUIREHEHT (SR) APPLICABILITY The Technical Requirements (TRs) in this manual follow the same LCO applicabi lities as the Improved Technical Specifications with the exception of LCO 3.0.6 which deals solely with ITS LCOs on support/supported system inoperabilities. The Technical Surveillance Requirements (TSRs) in this manual follow the same SR apiplicabilities as the Improved Technical Specifications.

The TRs in this manual also -follow the same organization as the Improved Technical Specifications (e.g., Reactivity Control System requirements are contained in TR Chapter 3,1).

Ginna Station TRH TRH 3.0-l" Revision 0

ACTIONS continued CONDITION REQUIRED ACTIONS COMPLETION TIHE D. Required Action and D. I Be in MODE 5, 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> associated Completion Time of Condition C not met.

E. Both boron injection E. I Enter LCO 3 '.3. Immediately subsystems inoperable.

Ginna Station TRH TRH 3.1-2 Revision 0

Boron injection System MODES 5 and 6 IR 3.1.2 3.1 REACTIVITY CONTROL SYSTEMS

3. 1,2 Boron Injection System MODES 5 and 6 TR 3.1.2 One boron injection subsystem shall be OPERABLE.

APPLICABILITY: MODES 5 and 6.

ACTIONS CONDITION RE(VIREO ACTIONS COMPLETION TIHE 0*4 A. Required boron A.l Suspend CORE Immedi a te1 y injection subsystem ALTERATIONS.

inoperable.

AND A.2 Suspend positive Immediately reactivity changes.

AND

~ * .o A.3 Initiate action to Immediately restore required boron injection subsystem to OPERABLE st'atus.

Ginna Station TRH TRM 3.1-6 Revision 0

~ I I II ~ I

C REATS Toxic Ga s Instrumentation lR 3.3.1 3.3 IHSTRUHEHTATION 3.3.1 Control Room Emergency Air Treatment System (CREATS) Toxic Gas Instrumentation TR 3.3.1 The CREATS actuation instrumentation for each toxic gas Function in Table TR 3.3. 1- 1 shall be OPERABLE.

APPLICABILITY: HOOES 1, 2, 3, 4, 5'and 6.

ACTIONS

-HOTE-CREATS air intake may be unisolated fnr up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per day for fresh air makeup to improve the working environment in the control room.

COHO I T ION, RE/VIREO ACTIONS COMPLETION TINE A. One or more toxic gas A.I Place CREATS in 1 hour functions with one HOOE F.

channel inoperable, SURVEILLANCE RE(jUIREHENTS SURVEILLANCE FRE(UEHCY TSR 3.3.1.1 Perform COT. 31 days TSR 3.3. 1.2 Perform CHANNEL CALIBRATION. )8 months Ginna Station TRH 3.3-1 Revision 0

Circulating Water Flood Protection Instrumentation TR 3.3.2 3.3 INSTRUHENTATION 3.3.2 Circulating Water Flood Protection Instrumentation TR 3.3.2 The Circulating Water Flood Protection instrumentation for

'each Function in Table TR 3.3.2- I shall he OPERABLE.

APPLICABILITY: HODES I and 2.

ACTIONS

-NOTE------

Separate Condition entry is allowed for each set.

CONDITION REQUIRED ACTION COHPLET ION T IHE A. One or more Functions Initiate action to Immediately with one required verify that affected channel in one or more function set is set(s) inoperable. OPERABLE.

B. One or more Functions B.I Restore set to 7 days with two or more OPERABLE status.

required channels per set inoperable.

C. One or more Functions C.I Restore at least one 24 hours wl th both sets set to OPERABLE inoperable. "

status.

D. Required Action and D.l Be in MODE 3. 6 hours Assn~i~ted Completion Time rut met.

Ginna Station TRH 3.3-3 Revision 0

t eactor Vessel fiead Vents TR 3.4.1 3.4 RfACTOR COOLANT SYSTEM (RCS) 3.4.1 Reactor Vessel Head Vents TR 3.4.1 Two reactor vessel head vent valves, in one vent flow path, shall be OPERABLE and closed.

APPL I CAB IL I TY: 'OOES 1, 2, and 3.

'CT IONS CONO I T ION REQUIRED ACTIONS COMPLETION TIHE A. One or more required -------------NOTE------------

reactor vessel head LCO 3.0.4 is not applicable.

vent valves inoperable.

Initiate action to Immediately OR close required vent valve(s).

One or more required reactor vessel head vent valves open.

A.2 Initiate action to Immediately remove motive power I'rom each required vent valve actuator.

AD 3 Restore required 30 days reactor vessel head vent valve(s) to OPfRABLE status.

B. Required Actions and B.l Be in HOOE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

B.2 Be in MOOE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Ginna Station TRH TRH 3.4-1 Revision 0

Reactor Vesse) >lead Vents TR 3.4.1 SURVEILLANCE REQUIREHENTS SURVEILLANCE FREQUENCY TSR 3.4. 1. 1 Verify the required reactor hea'd vent 18 months manual isolation valves are locked open.

TSR 3.4. 1.2 Verify flow through the required reactor 10 months vessel head vent path using either liquid or gas.

Ginna Station TRH TRH 3.4-2 Revision 0

3.7 PLANT SYSTEHS There are no technical requirements associated with this Chapter.

I I

Ginna Station ...TRH 3.7-1 Revision 0

V . e l

Refueling Manip Lor Crane interlocks TR 3.9.3

'l 3. 9 REFUELING OPERAl I ONS 3.9.3 Refueling Manipulator Crane Interlocks TR 3.9.3 The refueling manipulator crane interlocks shall be OPERABLE.

APPLICABILITY: During use nf the refueling manipulator crane with fuel in the vessel.

ACTIONS CONDITION REQUIRED ACTION COHPLETION TIHE A. Refuel ing manipul ator A.I Suspend use of Immedi ~ te 1 y crane interlocks refueling manipulator inoperable. --crane.

SURVEILLANCE RE(U I REMEN TS SURVEILLANCE FREQUENCY TSR 3.9,3.1 Veri fy the refuel ing manipulator crane Once prior to interlocks are OPERABLE. refueling operations 0 Ginna Station 3.9-:

TRH TRH Revision 0