ML17286A497: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/05/1990
| issue date = 12/05/1990
| title = Revised Epips,Including Rev 8 to 13.8.2,Rev 10 to 13.10.9, Rev 8 to 13.11.13,Rev 8 to 13.14.1,Rev 6 to 13.14.3,Rev 10 to 13.14.4 & Rev 7 to 13.14.9
| title = Revised Epips,Including Rev 8 to 13.8.2,Rev 10 to 13.10.9, Rev 8 to 13.11.13,Rev 8 to 13.14.1,Rev 6 to 13.14.3,Rev 10 to 13.14.4 & Rev 7 to 13.14.9
| author name = PETERS J F
| author name = Peters J
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)DOCKET.4 05000397 ACCESSION NBR: 9012130347 DOC.DATE: 90/12/05 NOTARIZED:
{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION PETERS,J.F.
ACCESSION NBR: 9012130347             DOC. DATE: 90/12/05     NOTARIZED: NO                       DOCKET. 4 FACIL:50-397   WPPSS   Nuclear Project, Unit 2, Washington Public                         Powe 05000397 AUTH. NAME           AUTHOR AFFILIATION PETERS,J.F.         Washington Public Power Supply RECIPIENT AFFILIATION                  System'ECIP.NAME R
Washington Public Power Supply System'ECIP.NAME RECIPIENT AFFILIATION
                                                                                                  //P/pg
//P/pg R


==SUBJECT:==
==SUBJECT:==
Rev 8 to Procedures Manual 13.8.2,"Manual Offsite Dose Calculations"&Rev 10 to Procedures Manual 13.10.9.D DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR ENCL 2 SIZE: TITLE: OR Submittal:
Rev 8     to Procedures         Manual 13.8.2,   "Manual Offsite Dose Calculations"       & Rev 10   to Procedures   Manual 13.10.9.
Emergency Preparedness Plans, Impel ment'g Procedures, C NOTES:/'ECIPIENT ID CODE/NAME PD5 PD INTERNAL: AEOD/DOA/IRB NUDOCS-ABSTRACT EXTERNAL: NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME ENG, P.L.NRR D PEPB9D LE 01 NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D D S D NOTE TO ALL"RIDS" RECIPIENTS:
D DISTRIBUTION CODE: A045D TITLE:  OR COPIES RECEIVED:LTR Submittal: Emergency Preparedness             Plans, Impel ENCL  2 ment'g SIZE:
PLEASE HELP US TO REDUCE WASTE!CONTACr THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL 8 D D f'-'a X WhSHlNGTON PUBLlC POWIll 2 SUPP'VSTEM IIV IXROPFlCE MEMOIRAZ%DUM DATE: TOt December 5, 1990 Distributi
Procedures, C NOTES:                                                                                                     /
;,90t21202e7 901205-P R ADOCK 05000397 PDC FROM: J.f.Pet , Plant Administration, WNP-2 (927S)SUBJECT WNP-2 PLANT PROCEDURES MANUAL" VOLUME 13 PACKAGE NO.90"318  
              'ECIPIENT                 COPIES          RECIPIENT                      COPIES ID  CODE/NAME            LTTR ENCL      ID   CODE/NAME                   LTTR ENCL PD5 PD                       1    1    ENG, P. L.                          1    1 D
INTERNAL: AEOD/DOA/IRB                   1     1     NRR D      PEPB9D                  1     1 NUDOCS-ABSTRACT              1     1             LE                   01     1     1             D EXTERNAL: NRC PDR                        1     1     NSIC                                1     1             S D
D D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACr THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR               8   ENCL                 8
 
f'
-'a X
 
WhSHlNGTON PUBLlC POWIll 2 SUPP'VSTEM IIVIXROPFlCE MEMOIRAZ%DUM
                                                                                ;,90t21202e7 901205
                                                                                -P R ADOCK 05000397 PDC DATE:    December 5, 1990 TOt    Distributi FROM:     J. f. Pet     , Plant Administration,       WNP-2 (927S)
SUBJECT       WNP-2 PLANT PROCEDURES MANUAL         " VOLUME 13 PACKAGE NO. 90"318


==REFERENCE:==
==REFERENCE:==
PPM  *1.2.4 The    following Procedures have been revised/approved and are to be inserted in your controlled copy of Volume 13 of the Plant Procedures Manual, and the superseded revisions are to be removed and destroyed:
Procedure              Rev ~                          Title 13.8.2                  8          Manual  Offsite  Dose  Calculations 13.10.9                10            Operations Support Center Operations and Operations Support Center Director Duties 13.11.13                8        . EOF News Writing Team Duties 13  '4.1                8          Emergency Exposure Levels/Protective Action Guides 13.14.3                6          Supply System Health Physics Procedures, Radiologi-cal 'rograms Innstructions, and'nvironmental Programs Instructions 13.14.4              10            Emergency Equipment 13.14.9                7          Emergency Program Maintenance To    verify receipt and inclusion of these Procedures, please sign, date and return this receipt to S. Le ard, MD 927A within TEN (10) WORKING DAYS of the date of this IOM.
Date          . signature  o    Manua  Ho  der        Contro    ed Copy Number JFP/sl Attachments WP.102 AS (440)


PPM*1.2.4 The following Procedures have been revised/approved and are to be inserted in your controlled copy of Volume 13 of the Plant Procedures Manual, and the superseded revisions are to be removed and destroyed:
ljlSII(MILUH VUlitt. D Control Control                                                                                                                                    lidil
Procedure Rev~Title 13.8.2 13.10.9 13.11.13 13'4.1 13.14.3 13.14.4 13.14.9 8 10 8 8 6 10 7 Manual Offsite Dose Calculations Operations Support Center Operations and Operations Support Center Director Duties.EOF News Writing Team Duties Emergency Exposure Levels/Protective Action Guides Supply System Health Physics Procedures, Radiologi-cal'rograms Innstructions, and'nvironmental Programs Instructions Emergency Equipment Emergency Program Maintenance To verify receipt and inclusion of these Procedures, please sign, date and return this receipt to S.Le ard, MD 927A within TEN (10)WORKING DAYS of the date of this IOM.Date.signature o Manua Ho der Contro ed Copy Number JFP/sl Attachments WP.102 AS (440) ljlSII(MILUH
: ~Co  y,Ho.                     ot~    Location                      Drop
-VUlitt.D Control~Co y No.2 3 4 5 6 7 8 9 10 ll 12 17 21 24 25 26 27 28 29 30 31 33 34 35 36 37 41 42 46 47 49 50 51 52 53-54 56 Location>w~Noil 0 927A Control Roan Shift Manager Plant Manager Licensed Training Sioulator Technical Manager Operations Manager HP/Chanistry lhnager Maintenance Manage Plant Admin.Manager Engineering Services Central Training Services (Sec.13.14)Chemistry Supervisor Health Physics Supervisor Plant gA/()C Manager Project Manager, Bechtel Region V, HRC Security Programs thnager Region Y, HRC LIP-3 Technical Library E.O.F.RecorddRoan
~Co y No.                               Location>           w~Noil 0                                     o 57            Benton County Dept of. Energ.'gmt.
~TSC Emergency Response/Cabinet Adnin.Security Specialist HP Technicians Office Resident Inspector Emergency Preparedness Program Ngr.of Emerg Plann&Environ Prog HHP-2'Security'lhintenance Training IS&FP Director Engineering Security Training/Evaluation Plant Enargency Director Energy Fac.Site Eval.Council Division of Energency thnayment Dept.Soc.&Health Serv.Dept.Soc.8 Health Serv.(Seattle)Federal Energency Mgmt.Agency U.S'.Department of Energy 927A 927M 1022 1034 988U 9270 927K 927S 927S 981G'027 927A 927A 9568 964D, 1021 700 1020 927A 968 927H 901A 1020 1020 913 184 9828 520 1021 927A I/Control:~Co y,Ho.57 58 60 61 63 64 66 68 69 73 74 75 78 80 82 83 86-87 90 91 92 93 94 95 96 97 98 102 104 105 106 ,114 123 126 127-132 (6)~133 134-136 (3)137-140 (4)142, H/A Location lid ot~o Benton County Dept of.Energ.'gmt.
2    Control Roan                                         927A              58            lIP-2 Security                                913'13, 3    Shift Manager                                       927A              60            HHP-2  Security 4    Plant Manager                                       927M              61            Operations Support Center/Cabinet            nichroco>
lIP-2 Security il Drop 913'13, nichroco>HHP-2 Security Operations Support Center/Cabinet 1020 927A'034'27A 1021 wg 927A 927A 1020 1020 Document Control Desk, HRC Corporate Camunications Energency Preparedness Program Energency Preparedness Program Radiological Programs Offsite Agency Center Security Decision Center Crisis Managenent Center Technical Data Center Corporate Library Telecamunication Services.Energency Preparedness Program HRC Grergency Response Energency Preparedness Program Energency Training Planning 8 Scheduling Asst.Managing Director for Operations Licensed Training Eoergency Planning t4$AC Field Team Kits (13.9 series, 13.13.4 and 13.14.4)tVF Field Team Kits (13.5.4, 13.7.5, ,13.9 series, 13.13.4, and 13.14.4)Pacific H.M.Labs Kathy t4Grllamh (tenn Onlv)Hash D.C 325 1020 1020 1020 1020 1020 325.-i 1020 330 1032 1020 1020 1020 1020 994E 1023 1020 1020 1020 917Y Emergency Training Rakaste Control Rocm Sinulator, Shift Manager Reoate Shutdae Roan (13.4.1)EOF Cammications Center (EOFCC)~Dept.~.8 llealth Serv.Dept.Soc.8 Health Serv.Dept.Soc.&Health Serv.Shift Technical Advisor Plant Records ECF Decision Center l"lNAC Sinulator, Shift Technical Advisor (QA)  
63            Emergency  Training                          1020 5    Licensed Training                                   1022 6    Sioulator                                           1034              64            Rakaste Control Rocm                          927A'034 7    Technical Manager                                   988U                66            Sinulator, Shift Manager Reoate Shutdae Roan (13.4.1)
<<h wAININO'ICN
                                                                                                                                                          '27A 8    Operations Manager                                   9270                68 69            EOF Cammications Center (EOFCC)              1021 HP/Chanistry lhnager                                 927K 10 9
~U~slc eowem 4P SUPPLY SYSTEM PLANT PROCEDURES MANUAL WNP-2 PRPCEOURE NUMBER i13.8.2 APPROVE OATE 03/29/90 VOI.UME NAME 18%EMERGENCY PLAN I LEMENTING PROCEDURES SECTION ,13.8 OFFSITE DOSE CALCULATIONS TITI.E 13.8.2 ONUAL.OFFSITE DOSE CALCULATIONS 13.8.2.1~pur ose The purpose of this rocedure is to provide instructions on using redun-dant EDPS Computer pr grams to predict off ite dose rates and integrated doses for populations downwind of WNP-2 during an emergency.
Maintenance Manage                                   927S                73        ~
These calculations are based u on actual meteg(ological data and the actual or projected airborne relea e rates.TP'is procedure is limited to the airborne pathway, since it's considered the only credible release mode.This procedure can be utilized by the Control Room, Technical Support Center, or fiUOAC dose assessmeiIt
Dept.  ~. 8 llealth Serv.
'ersonnel, if the Computerized Emergency Dose Projection System is not op rational, or if desired.The dose rates calculated from thi's procedure should be confirmed by actual Environmental Field Team Measureme'nts as soo as practicable.
ll    Plant Admin. Manager                                 927S                74 75 Dept. Soc. 8 Health Serv.
13.8.2.2 References EPIP 13.8.1, Computerized Emergency Dos Projection System Operations 13.8.2.3 Procedurer L(~II~I Res onsibi lit Action Assigned Dose Assess ent Personnel (Radiological Emergency Manager, Radiation Protection Manager, Shift Technical Adviser or other assi,gned individua'Is) 1.Perform this prooydure if the Emergency Dose Projection Systems EDPS)is inoperable, and an Alert, Site Area or General Emergency in-cluding a release ha been declared, or when directed by the Radio qgical Emergency Mana-ger, Radiation Protec&'on Hanager or Plant Emergency Director.PROCEOURE NUMBER 13.8.2 WP.597 R3 I2/86)REVISION NUMBER 7 PAGE NUMBER 13.8.2-1 of 9 E I r 4 j I Res onsibilit Assigned Dose Assessment Personnel (Radiological Emergency Manager, Radiation Protection Manager, Shift Technical Adviser or other assigned individuals)(Cont.)Action 2.Utilize the TRS-80 Model 100 micro-computer, or IBM PS/2 as the redundant Emergency Dose Projection System (BEDPS)The TRS-80 is stored in the STA's office, the TSC, or the MUOAC.The TRS-80 Model can be operated on four (4)AA batteries or adapted to 120 VAC.IBM PS/2s loaded with BEOPS are located in the Control Room, the TSC and MUDAC.3.Turn on the computer and select the program from the menu.a..TRS-80 Model 100 1)Turn the power switch ON.(The switch is on the right side of the computer.)
Dept. Soc. & Health Serv.
2)Adjust the display intensity'sing the control"OISP" next to the power switch.3)Press the space bar until the cursor is over"BEOPS.BA" on the menu.4)Press"ENTER".The program will load and start asking interactive questions.
wg 12    Engineering Services                                 981G 78            Shift Technical Advisor                      927A 17    Central Training Services (Sec. 13.14)                     '027 80            Plant Records                                927A Chemistry Supervisor                                 927A 1020 82            ECF  Decision Center 21    Health Physics Supervisor                           927A 1020 83            l"lNAC 24    Plant gA/()C Manager                                 9568 Sinulator, Shift Technical Advisor (QA) 86 25    Project Manager, Bechtel                             964D,            -                Document Control Desk, HRC                    Hash D.C 87 26    Region V,               HRC Corporate Camunications                        325 90 27    Security Programs thnager                           1021 91            Energency Preparedness Program                1020 28    Region Y,               HRC 92            Energency Preparedness Program                1020 29    LIP-3 Technical Library                             700 93            Radiological Programs                          1020 30    E.O.F. RecorddRoan                 ~
5)Whenever possible, operate computer using available 120 VAC power and minimize battery use.b.In the event that BEOPS.BA has been lost From the TRS-80 Model 100's memory, the program can be reloaded from the magnetic tape cassette stored with the TRS-BO.1)Connect the tape recorder/player to the TRS-80 using the supplied cable.2)Turn on the TRS-80.Set tape recorder volume control to"P".PROCEDURE NUMBER 13.8.2 REVISION NUMBER 7 PAGE NUMBER 13.8.2-2 of 19 iVP 59II R1 (9 aI)
1020 94            Offsite Agency Center                          1020 31    TSC Emergency Response/Cabinet                       927A 95            Security Decision Center                      1020 33    Adnin. Security Specialist                           968                96            Crisis Managenent Center                      325.
Res onsibi lit Action Assigned Dose Assessment Personnel (Radiological Emergency Manager, Radiation Protection Manager, Shift Technical Adviser or other assigned individuals)(Cont.)3)Insert the cassette containing the BEOPS.BA program and rewind.Reset tape counter to"000".Hake sure that the recorder/player is set for remote control.(" Pause" set to"Out")5)Press the PlAY key and be sure that it locks down.6)Access BASIC from the Main Menu of the TRS-80 (position cursor over BASIC and press ENTER).7)Type CLOAD"BEDPS" and press ENTER.8)The TRS-80 will search the, tape for BEOPS.BA and print the names of any files it passes over.Once BEDPS.BA is loaded, the TRS-80 will print OK.9)Type SAVE"BEDPS.BA".
34    HP   Technicians Office                             927H                97            Technical Data Center                    -i  1020 35    Resident Inspector                                   901A                98            Corporate Library                            330 36    Emergency Preparedness Program                       1020              102            Telecamunication Services                    1032 37    Ngr.       of Emerg Plann & Environ Prog             1020              104          . Energency Preparedness Program                1020 41                                                          913              105            HRC Grergency Response                        1020 HHP-2'Security'lhintenance 42                                Training                   184              106            Energency Preparedness Program                1020 46    IS&FP                                                 9828            ,114            Energency Training                            1020 47    Director Engineering                                 520              123            Planning  8  Scheduling                      994E 49    Security Training/Evaluation                         1021              126            Asst. Managing Director for Operations        1023 50    Plant Enargency Director                             927A              127-132 (6)      Licensed Training                              1020 51    Energy Fac. Site Eval. Council                                       ~  133            Eoergency Planning                            1020 52    Division of Energency thnayment                                         134-136 (3)     t4$ AC Field Team Kits (13.9 series, 53    Dept. Soc. & Health Serv.                             I/                                13.13.4 and 13.14.4) 54    Dept. Soc. 8 Health Serv. (Seattle)                                     137-140 (4)    tVF Field Team Kits (13.5.4, 13.7.5,           1020 Federal Energency Mgmt. Agency                                                          ,13.9 series, 13.13.4, and 13.14.4) 56    U.S'. Department              of Energy                                142,           Pacific H.M. Labs H/A            Kathy t4Grllamh (tenn Onlv)                   917Y
Stop tape recorder, rewind tape, remove tape and disconnect tape recorder.C.IBH PS/2 (HUOAC)Enter menu number For BEOPS selection.
2)Ensure laser printer is on.3)Read and follow instructions shown on screen.4)5)Default values must be entered.If needed, a backup disk for the PS/2 is located in PSF Room 129F.6)Nhen a Full page is not produced by the laser printer, you must eject the partial page before you begin another set of calculations.
PROCEDURE NUMBER VitP 598 Rl I9 83)REVISION NUMBER PAGE NUMBER 13.8.2-3 of 19


CQNTIROLLED COPY Res onsibi lit Action Assigned Oose Assessment Personnel (Radiological Emergency Hanager, Shift Technical Adviser or other assigned individuals)(Cont.)
  <<h wAININO'ICN ~ U ~ slc eowem 4P  SUPPLY SYSTEM PLANT PROCEDURES MANUAL WNP-2 PRPCEOURE NUMBER              APPROVE                                      OATE i13.8.2                                                                        03/29/90 VOI.UME NAME 18%        EMERGENCY PLAN    I  LEMENTING PROCEDURES SECTION
4, 5.Complete Attachment A,"Offsite Oose Calcu-lation Oata Sheet".See Attachment 8 for instructions on each individual question or entry.Using the information on the data sheet answer the questions as they appear on the computer screen.Always press"ENTER" after answering each question.6.At the completion of the program a"Summary of Ooses" will be displayed.
                        ,13.8       OFFSITE DOSE CALCULATIONS TITI.E 13.8.2     ONUAL. OFFSITE DOSE CALCULATIONS 13.8.2.1     ~pur ose The purpose    of this    rocedure    is to provide instructions                on  using redun-dant    EDPS  Computer pr grams to predict off ite dose rates and integrated doses for populations downwind of WNP-2 during an emergency.                                   These calculations are based u on actual meteg(ological data and the actual or projected airborne relea e rates.                 TP'is procedure              is limited to the airborne pathway, since it 's considered the only credible release mode.
7.8.Copy the results onto Attachment C,"Summary of EOPS Backup Calculation".
This procedure can be utilized by the Control Room, Technical Support Center, or fiUOAC dose assessmeiIt 'ersonnel,                     if   the Computerized Emergency Dose Projection System is not op rational, or                       if  desired. The dose rates calculated from thi's procedure should be confirmed by actual Environmental                            r Field    Team Measureme'nts  as soo    as practicable.
Perform calculations for 1.2, 2.0,.3.0+, 5.0 and 10 miles downwind.Perform calcu-lations for any other distance downwind, as needed.+NOTE: Also calculate 3.0 miles due to i rregul a ri t i es o f 2.0 mi 1 e boundary.9.Refer to EPIP 13.14.2,"Process for Oeter-mining Protective.
13.8.2.2       References L
Action Recommendations".
EPIP    13.8.1, Computerized Emergency        Dos      Projection System Operations                  (
Initiate protective actions as required.10, Attachments 0, E, F and G contain blank copies of the 10 mile maps for a)Whole Body Oose Rates, b)Whole Body Integrated Oose, c)Thyroid Oose Rate, and d)Thyroid Integrated Oose.Hark the calculated doses at the correct distances and in the downwind direction on all four maps.Indicate the centerline of the plume by a line on each map in the down-wind direction.
                                                                                                                        ~II  ~
Label"Plume Centerline".
13.8.2.3      Procedure I
ROCEDURE NUMBER 13,8.2 REVISION NUMBER 7 PAGE NUMBER 13.8.2-4 of 19 wP 59B Rl (9 83)
Res  onsibi  lit                                                Action Assigned Dose Assess        ent        1. Perform    this prooydure            if the  Emergency Dose Personnel                                    Projection Systems EDPS) is inoperable, and (Radiological Emergency                      an Alert, Site Area or General Emergency in-Manager,     Radiation                      cluding a release ha been declared, or when Protection Manager, Shift                    directed by the Radio qgical Emergency Mana-Technical Adviser or                         ger, Radiation Protec&'on Hanager or Plant other assi,gned                              Emergency Director.
E C'Y' Res onsibi lit Action Assigned Oose Assessment Personnel (Radiological Emergency Manager, Shift Technical Advisor or other assigned individuals)(Cont.)12.Include the maps with any recommendation for protective action recommendations made off-site using EPIP 13.14.2,"Process for Oeter-mining Protective Action Recommendations".
individua'Is)
13.Maintain copies of all calculations,'maps and Protective Action'ecommendations made using this procedure.
PROCEOURE NUMBER                  REVISION NUMBER    PAGE NUMBER 13.8.2                       7                                                 13.8.2-1 of   9 WP.597 R3 I2/86)
14, Evaluate the need to update the dose assess-ment calculations if~an of the following parameters change significantly (e.g., by 20$or more): a.Elevated release point monitors.b.Radwaste ventilation monitors.c.Turbine building ventilation monitors.d.Containment radiation level.e.Measured effluent flow rate.f.Containment pressure.g.Wind speed~h.Wind direction (change of 22.5 degree sector).i.Pasquill stability class.1)Temperature Lapse Rate.2)Sigma theta.j.Estimated duration of release.PROCEOURE NUMBER 13.8.2 REVISION NUMBER 7 PAGE NUMBER 13.8.2-5 of 19 WP 598 Rl Ig.aI)
CQNTIRQLLF.G CQPY 13.8.2.3 Attachments A.Offsite Dose Calculation Data Sheet.B.C.Instructions for Offsite Dose Calculation Data Sheet.Summary of EQPS Dose Calculations.
D.10 Nile Nap-Whole Body Dose Rate.E.10 Nile Nap-Whole Body Integrated Dose.F.10 Nile Nap-Thyroid Dose Rate G.10 Nile Nap-Thyroid Integrated Dose Radwaste Building Exhaust Flow-Millivolt to CFM Conversion.
PROCEDURE NUMBER 13.8.2 REVISION NUMBER 7 PAGE NUMBER 13.8.2-6 of 19 WP.598 R1 (9 LII CONTIROLLED COPY OFFSITE DOSE CALCULATION DATA SHEET DATE: TIME: NAME: CALCULATION:
REACTOR TURBINE RAOWASTE BLDG ORYMELL BLDG BLDG A.Release Point (RX Bldg, ON, TG, RW)(Y or N)B.Meteorology 1.Stability Class (A-G)(1)(2)(3)(4)(5)(6)or 4T/aZ or Sigma Theta 2.Distance Downwind (1.2, 2.0, 3.0, 5.0, 10.0 Miles)3.Mind Speed 4.Nind Direction (From-To)C.Time Since Reactor Shutdown O.Stand By Gas Treatment System (SGTS)Efficiency
'C/100m Degrees MPH Minutes Degrees Miles (7)(9)(10)E.Release Point Flow Rate (CFM)F.Source Term-Radiation Monitors, Field Data or Sample Results (R, F, or S)(If source term is based on sample results complete attached sheet)1.Radiation Monitor Reading CFH CFH CFH CFH (12)(13)Reactor Turbine Radwaste~Bl d~Bl d~Bl d a~High Range Elevated Release Point (R/Hr)R/hr XX XX (14)b.Intermediate (extended)
Range Noble Gas Monitor (PMU)PMU PHU PMU (15)C.Low Range Noble Gas Monitor (CPM)Attachment A Page 1 of 3 CPM CPM CPM (16)PROCEDURE NUMBER 13.8.2 WP 598 A I (9 83)REVISION NUMSER 7 PAGE NUMSER 13.8.2-7 of 19


OFFSITE DOSE CALCULATION DATA SHEET (Continued) 1.Radiation Monitor Reading Reactor Turbine Radwaste~Bl d~Bl d~Bl d d.Drywell LOCA Rad Monitor (CMS-R IS-27E)e.Drywell LOCA Rad Monitor (CMS-RIS-27F) 2.Field Data a.Plume Centerline Dose Rate b.Plume Centerline Air Sample at (Comp'lete attached Air Sample Data Sheet)G.Release Duration (Minutes)R/hr XX R/hr XX mR/hr at min XX XX miles miles Attachment A Page 2 of 3 PROCEDURE NUMBER 13.8.2 REVISION NUMBER 8 7 PAGE NUMBER 13.8.2-8 of 19 WP 599 Rl (9 8QI SAMPLE RESULTS FOR GASEOUS RELEASE POINTS CONCENTRATIONS IN Ci/M or Ci/CM 3 (See Attachment 8, Item 20, for instructions)
E I r
NUCLIDE Kr-83M Kr-85M Kr-85 Kr-87 Kr-88 Kr-89 Xe-1 31M Xe-133M Xe-133 Xe-135M Xe-135 Xe-137 Xe-138 I-131 I-132 I-133 I-134 I-135 REACTOR BUILDING PRE-SGTS POST SGTS-DRYWELL TURBINE BUILDING.RADWASTE BUILDING PRE-HEPA POST-HEPA-'LUME CENTER LINE AT MI Attachment A-1 Page 3 of 3 PROCEDURE NUMBER 13.8.2 REVISION NUMBER 7 PAGE NUMBER 13.8.2-9 of 19 WP.599 R1 (9.83)  
4 j
~.I 0 CONTIRQLLED COPY OFFSITE DOSE CALCULATION DATE SHEET INSTRUCTION 1.Date: Enter current date (mm:dd:yy).
I
2.Time: hh:mm, a.m.or p.m.3.Name: Person performing calculation.
 
4.Calculation g: Sequential Number of calculations performed during current emergency.
Res onsibilit                                        Action Assigned Dose Assessment        2. Utilize the TRS-80 Model 100 micro-computer, Personnel (Radiological                or IBM PS/2 as the redundant Emergency Dose Emergency Manager, Radiation          Projection System (BEDPS)                The TRS-80 is Protection Manager, Shift              stored in the STA's office, the TSC, or the Technical Adviser or other            MUOAC.      The TRS-80 Model can be          operated on assigned individuals) (Cont.)          four (4)  AA    batteries or adapted to 120 VAC.
5.Release Point: Indicate which building(s).
IBM PS/2s      loaded with BEOPS are located in the Control      Room,  the  TSC and  MUDAC.
There may be multiple points.If the release point is the Reactor Building, and the Drywell LOCA rad monitors (CNS-RIS-27E or F)are being used to estimate the source term, mark the Drywell as the release point, not the Reactor Building.6.Meteorology Conditions:
: 3. Turn on the computer and select the program from the menu.
Obtain necessary meteorological data from the plant Graphic Display System (GDS)or: a.Telephone the PNL Weather Forecaster (Primary)at 373-2875 or: b.Telephone the National Weather Service Forecaster at: 1-503-281-1911 Portland, Oregan 1-206-526-6083 Seattle, Washington c.Stability Class vs.hT/hz signal.Stabi 1 i ty Classification Pasquill Ca~ecaories Temperature Change With Hei ht'C/100 m Extremely un'stabl e Moderately unstable Slightly unstable Neutral aT/az-1.9-1.9 aT/hz-1.7-1.7 aT/az-1.5-1.5 aT/hz-0.5 Slightly stable Moderately stable Extremely stable-0.5 aT/az 1.5 aT/az 4.0 aT/az 1.5 4.0 Attachment 8 Page 1 of 4 PROCEDURE NUMBER 13.8.2 REVISION NUMBER 7 PAGE NUMBER 13.8.2-10 of 19 Wp 598 R1 I9 aI)  
: a.  .
TRS-80 Model 100
: 1)    Turn the        power switch ON.      (The switch is on the right side of the computer.)
: 2)    Adjust        the    display intensity
                                                                    'sing      the control "OISP" next to the power switch.
: 3)    Press    the space bar until the cursor is over "BEOPS.BA" on the menu.
: 4)    Press    "ENTER".      The program    will load and      start asking interactive questions.
: 5)    Whenever            possible,      operate computer using available 120            VAC power and minimize battery use.
: b. In the      event that BEOPS.BA has been lost    From    the TRS-80 Model 100's memory, the program can be reloaded from the magnetic tape cassette stored with the TRS-BO.
: 1)    Connect      the  tape recorder/player to the      TRS-80    using the supplied cable.
: 2)    Turn    on the TRS-80.          Set tape recorder volume control to "P".
PROCEDURE NUMBER                  REVISION NUMBER    PAGE NUMBER 13.8.2                    7                                        13.8.2-2 of  19 iVP 59II R1 (9 aI)
 
Res onsibi lit                                    Action Assigned Dose Assessment                  3)    Insert the cassette containing the Personnel (Radiological                          BEOPS.BA    program and rewind. Reset Emergency Manager, Radiation                      tape counter to "000".
Protection Manager, Shift Technical Adviser or other                      Hake sure      that the recorder/player assigned individuals) (Cont.)                    is set          for remote control.
(" Pause" set to "Out")
: 5)    Press    the    PlAY key      and  be    sure that  it locks      down.
: 6)    Access    BASIC      from the Main Menu of the      TRS-80 (position cursor over BASIC and press ENTER).
: 7)    Type      CLOAD      "BEDPS"    and      press ENTER.
: 8)    The    TRS-80    will search the, tape for    BEOPS.BA      and print the names of any files it passes                    over.
Once      BEDPS.BA        is loaded, the TRS-80 will print OK.
: 9)    Type    SAVE    "BEDPS.BA".        Stop tape recorder,        rewind      tape,      remove tape and disconnect tape recorder.
C. IBH PS/2 (HUOAC)
Enter      menu      number      For    BEOPS selection.
: 2)    Ensure    laser printer is on.
: 3)    Read      and      follow      instructions shown on screen.
: 4)    Default values must        be  entered.
: 5)    If  needed,    a  backup    disk for the PS/2  is located in      PSF Room      129F.
: 6)    Nhen  a Full page is not produced by  the laser printer, you must eject the partial page before you begin another set of calculations.
PROCEDURE NUMBER                  REVISION NUMBER PAGE NUMBER 13.8.2-3 of    19 VitP 598 Rl I9 83)
 
CQNTIROLLED COPY Res onsibi lit                                          Action Assigned Oose Assessment        4,      Complete Attachment A,            "Offsite    Oose  Calcu-Personnel (Radiological                  lation Oata Sheet".            See    Attachment    8  for Emergency Hanager, Shift                instructions on each          individual question or Technical Adviser or other              entry.
assigned individuals)(Cont.)
: 5.      Using the information on the data sheet answer the questions as they appear on the computer      screen.        Always press          "ENTER" after    answering each question.
: 6.      At the completion of the program                a  "Summary of Ooses"    will be displayed.
: 7.      Copy  the results onto Attachment            C, "Summary of  EOPS  Backup    Calculation".
: 8.      Perform calculations for 1.2, 2.0, .3.0 +,
5.0 and 10 miles downwind. Perform calcu-lations for any other distance downwind, as needed.
                                                      + NOTE:      Also      calculate      3.0    miles    due  to i rregul a ri t i es  o f 2. 0 mi 1 e boundary.
: 9.      Refer to EPIP 13.14.2, "Process for Oeter-mining Protective. Action Recommendations".
Initiate protective actions            as  required.
10,    Attachments 0, E, F and                  G  contain blank copies of the 10 mile maps            for a)      Whole Body Oose Rates, b)      Whole Body      Integrated    Oose, c)      Thyroid    Oose  Rate, and d)      Thyroid Integrated Oose.
Hark    the calculated doses at the correct distances and in the downwind direction on all four maps. Indicate the centerline of the plume by a line on each map in the down-wind    direction.        Label "Plume Centerline".
ROCEDURE NUMBER                REVISION NUMBER    PAGE NUMBER 13,8.2                      7                                          13.8.2-4 of      19 wP 59B Rl (9 83)
 
E C 'Y '
Res onsibi lit                                      Action Assigned Oose Assessment        12. Include the  maps  with any recommendation for Personnel (Radiological                protective    action recommendations made off-Emergency Manager, Shift                site using EPIP 13.14.2, "Process for Oeter-Technical Advisor or other              mining Protective Action Recommendations".
assigned individuals) (Cont.)
: 13. Maintain copies      of all calculations,    'maps and  Protective Action'ecommendations        made using  this procedure.
14,    Evaluate the need to update the dose assess-ment  calculations    if  ~an  of the following parameters change significantly (e.g., by 20$ or more):
: a. Elevated release point monitors.
: b. Radwaste  ventilation monitors.
: c. Turbine building ventilation monitors.
: d. Containment radiation      level.
: e. Measured  effluent flow rate.
: f. Containment pressure.
: g. Wind speed  ~
: h. Wind  direction    (change  of 22.5 degree sector)  .
: i. Pasquill  stability class.
: 1)    Temperature    Lapse Rate.
: 2)    Sigma  theta.
: j. Estimated duration of release.
PROCEOURE NUMBER                REVISION NUMBER    PAGE NUMBER 13.8.2                      7                                      13.8.2-5 of 19 WP 598 Rl Ig.aI)
 
CQNTIRQLLF.G CQPY 13.8.2.3 Attachments A. Offsite  Dose    Calculation Data Sheet.
B. Instructions for Offsite      Dose  Calculation Data Sheet.
C. Summary  of  EQPS  Dose  Calculations.
D. 10 Nile  Nap  Whole Body Dose      Rate.
E. 10 Nile  Nap  Whole Body    Integrated Dose.
F. 10 Nile  Nap  -  Thyroid Dose Rate G. 10 Nile  Nap  -  Thyroid Integrated  Dose Radwaste  Building Exhaust Flow -      Millivolt to CFM Conversion.
PROCEDURE NUMBER              REVISION NUMBER      PAGE NUMBER 13.8.2                    7                                  13.8.2-6 of  19 WP.598 R1 (9 LII
 
CONTIROLLED COPY OFFSITE DOSE CALCULATION DATA SHEET DATE:                        (1)
TIME:                        (2)
NAME:                        (3)
CALCULATION:                        (4)
REACTOR            TURBINE RAOWASTE BLDG ORYMELL      BLDG      BLDG A. Release    Point    (RX  Bldg,  ON, TG, RW)
(Y or  N)                                                                                    (5)
B. Meteorology
: 1. Stability      Class (A-G)                                                              (6) or 4T/    aZ                                          'C/100m or  Sigma Theta                                      Degrees
: 2. Distance Downwind                                                          Miles      (7)
(1.2, 2.0, 3.0, 5.0, 10.0 Miles)
: 3. Mind Speed                                              MPH
: 4. Nind Direction (From  To)                                        Degrees              (9)
C. Time Since Reactor Shutdown                                  Minutes                        (10)
O. Stand By Gas Treatment System (SGTS) Efficiency E. Release      Point Flow Rate    (CFM)                    CFH      CFH      CFH        CFH (12)
F. Source Term-Radiation Monitors, Field Data or Sample Results (R, F, or S)                                                                                (13)
( If source term is based on sample results complete attached sheet)
Reactor      Turbine    Radwaste
: 1. Radiation Monitor Reading                     ~Bl d        ~Bl d      ~Bl d a ~    High Range Elevated Release Point (R/Hr)                                  R/hr    XX          XX        (14)
: b.      Intermediate (extended)
Range Noble Gas    Monitor  (PMU)          PMU        PHU        PMU      (15)
C.      Low Range Noble Gas      Monitor (CPM)                                        CPM        CPM        CPM      (16)
Attachment    A Page  1 of  3 PROCEDURE NUMBER                      REVISION NUMSER      PAGE NUMSER 13.8.2                          7                                      13.8.2-7 of  19 WP 598 A I (9 83)
 
OFFSITE DOSE CALCULATION DATA SHEET      (Continued)
Reactor     Turbine   Radwaste
: 1. Radiation Monitor Reading                ~Bl d       ~Bl d     ~Bl d
: d. Drywell LOCA Rad Monitor
( CMS-R IS-27E)                             R/hr  XX        XX
: e. Drywell     LOCA Rad Monitor
( CMS-RIS-27F)                               R/hr  XX        XX
: 2. Field Data
: a. Plume   Centerline Dose Rate               mR/hr at          miles
: b. Plume   Centerline Air Sample   at                           miles (Comp'lete attached Air Sample Data Sheet)
G. Release Duration (Minutes)                             min Attachment   A Page   2 of 3 PROCEDURE NUMBER                  REVISION NUMBER    PAGE NUMBER 13.8.2                     8 7                                   13.8.2-8 of 19 WP 599 Rl (9 8QI
 
SAMPLE RESULTS FOR GASEOUS RELEASE POINTS 3
CONCENTRATIONS IN   Ci/M or   Ci/CM (See Attachment 8, Item 20,       for instructions)
REACTOR                            TURBINE NUCLIDE   BUILDING            DRYWELL        BUILDING .
RADWASTE BUILDING
                                                                                        'LUME CENTER LINE PRE-SGTS POST  SGTS PRE-HEPA POST-HEPA    AT MI Kr-83M Kr-85M Kr-85 Kr -87 Kr-88 Kr-89 Xe-1 31M Xe-133M Xe-133 Xe-135M Xe-135 Xe-137 Xe-138 I-131 I-132 I-133 I-134 I-135 Attachment A-1 Page 3   of 3 PROCEDURE NUMBER              REVISION NUMBER      PAGE NUMBER 13.8.2                     7                                   13.8.2-9 of 19 WP.599 R1 (9.83)
 
~. I 0
 
CONTIRQLLED COPY OFFSITE DOSE CALCULATION DATE SHEET INSTRUCTION
: 1. Date:   Enter current date (mm:dd:yy).
: 2. Time:   hh:mm, a.m.     or p.m.
: 3. Name:   Person performing     calculation.
: 4. Calculation g:           Sequential     Number     of calculations   performed     during current emergency.
: 5. Release   Point:     Indicate which building(s).         There may be multiple points.
If the release point is the Reactor Building, and the Drywell LOCA rad monitors (CNS-RIS-27E or F) are being used to estimate the source term, mark the Drywell as the release point, not the Reactor Building.
: 6. Meteorology Conditions: Obtain necessary meteorological data from the plant Graphic Display System (GDS) or:
: a. Telephone the     PNL Weather Forecaster     (Primary) at 373-2875 or:
: b. Telephone the National Weather Service Forecaster             at:
1-503-281-1911           Portland, Oregan 1-206-526-6083           Seattle, Washington
: c. Stability     Class vs. hT/hz signal.
Stabi i ty 1                          Pasquill                Temperature Change Classification                     Ca~ecaories             With Hei ht 'C/100     m Extremely un'stabl e                                             aT/az     -1.9 Moderately unstable                                        -1.9 aT/hz     -1.7 Slightly unstable                                          -1.7 aT/az     -1.5 Neutral                                                    -1.5 aT/hz   -0.5 Slightly stable                                             -0.5 aT/az     1.5 Moderately stable                                            1.5 aT/az     4.0 Extremely stable                                            4.0 aT/az Attachment   8 Page   1 of 4 PROCEDURE NUMBER                    REVISION NUMBER      PAGE NUMBER 13.8.2                         7                                     13.8.2-10 of   19 Wp 598 R1 I9 aI)
 
CQNTRQLLED CQPY OFFSITE DOSE CALCULATION DATE SHEET INSTRUCTION                  (Continued)  .
: d. Stability    Class vs. Sigma Theta. Signal Stability                      Pasqui    ll Classification                    ~Cate  aries                      de rees Extremely unstable                      A                            sigma  theta    22.5 Moderately unstable                      8                    22.5    sigma  theta    17.5 Slightly unstable                        C                    17.5    sigma  theta    12.5 Neutral                                  D          ~
12.5    sigma  theta    7' Slightly stable                          E                      7.5    sigma  theta    3.8 Moderately stable                        F                      3.8    sigma  theta    2.1 Extremely stable                        G                      2.1    sigma  theta Distance Downwind: 1.2 miles is the exclusion area boundary.
and 10.0 miles are the increments for population evacuatation.
2.0,  3.0''0 I Example:      If  the Dose Rate at 2 and 3 miles are above the Protective Action Guide    (EPIP 13.14.1 and 2) but below            it  at 5 miles then shelter or evacuate that downwind sector(s) to five miles.
: 8. Hind speed:      Enter in miles per hour.
            . 9. Hind  Direction:        Enter direction from and to in degrees 0-360o.
: 10. Time Since Reactor Shutdown:              Time    in minutes since reactor went subcri-tical. (Used to calculate decay of              radioactivity.)
ll. Standby    Gas  Treatment System (SGTS) Efficiency            (in percent):
: a. If ON, use 99.7
: b. If OFF, use 0
: 12. Ventilation Flow: In cubic feet per minute                (CFM).
Defaul t  .Va 1 ues:
RX    120,000    CFM normally, 4000 cfm if        SGTS on DM  0.725      Leakage/day = (.0072)(3.5E+5        ft. 3
                                                                                        )/24X60 =1.75CFM.
TG -  310,000    CFM RW -  84,000    CFM.  -  However,      if  getting Radwaste Building flow from Process Computer units are in millivolts not CFM.
See Attachment H For graph for conversion to CFM.
Attachment      B Page    2  of  4 PROCEDURE NUMBER                    REVISION NUMBER      PAGE NUMBER 13.8.2                          7                                        13.8.2-11 of  19 wP 598 Rl (9LI)


CQNTRQLLED CQPY OFFSITE DOSE CALCULATION DATE SHEET INSTRUCTION (Continued)
.d.Stability Class vs.Sigma Theta.Signal Stability Classification Pasqui ll~Cate aries de rees Extremely unstable Moderately unstable Slightly unstable Neutral Slightly stable Moderately stable Extremely stable Distance Downwind: 1.2 miles is and 10.0 miles are the increments A sigma 8 22.5 sigma C 17.5 sigma D~12.5 sigma E 7.5 sigma F 3.8 sigma G 2.1 sigma the exclusion area boundary.for population evacuatation.
theta 22.5 theta 17.5 theta 12.5 theta theta theta theta 7'3.8 2.1 2.0, 3.0''0 I 8..9.Example: If the Dose Rate at 2 and 3 miles are above the Protective Action Guide (EPIP 13.14.1 and 2)but below it at 5 miles then shelter or evacuate that downwind sector(s)to five miles.Hind speed: Enter in miles per hour.Hind Direction:
Enter direction from and to in degrees 0-360o.10.Time Since Reactor Shutdown: Time in minutes since reactor went subcri-tical.(Used to calculate decay of radioactivity.)
ll.Standby Gas Treatment System (SGTS)Efficiency (in percent): a.If ON, use 99.7 b.If OFF, use 0 12.Ventilation Flow: In cubic feet per minute (CFM).Defaul t RX DM TG RW.Va 1 ues:-120,000 CFM normally, 4000 cfm if SGTS on-0.725 Leakage/day
=(.0072)(3.5E+5 ft.)/24X60=1.75CFM.3-310,000 CFM-84,000 CFM.-However, if getting Radwaste Building flow from Process Computer units are in millivolts not CFM.See Attachment H For graph for conversion to CFM.Attachment B Page 2 of 4 PROCEDURE NUMBER 13.8.2 REVISION NUMBER 7 PAGE NUMBER 13.8.2-11 of 19 wP 598 Rl (9LI)
I''
I''
OFFSITE DOSE CALCULATION DATE SHEET INSTRUCTION (Continued) 13.Radiation Source Term: If release rates are being determined by the radiation monitors, mark (R);if they are based on sample results, mark (S);if based on field radioactivity samples or dose rates, mark (F).Refer to PPN 12.10 series"Post Accident Sampling and Analysis" if source term is based on samples.14.'igh Range Elevated Release Point Monitor (CNS-RIS-27C or D)(R/hour).Enter value if Reactor Buildng is release point.Use CMS-RIS-27C or 27D.(10 2-104 R/Hr)15.Intermediate (extended)
OFFSITE DOSE CALCULATION DATE SHEET INSTRUCTION               (Continued)
Range Noble Gas Radiation Monitors-Rx, TG or RW Indicate in Panel Heter Units (PNU).a~b.C.Rx-REA-RIS-19A (1-10 PNU)5 TG-TEA-RIS-13A (1-10 PHU)5 RW-WEA-RIS-14A (1-105 PHU)16.Low range Noble Gas Radiation Monitors-Rx, TG or RW (CPM).a, Rx-REA-RIS-19 (10-10 cpm)7 b.TG-TEA-RIS-13 (10-10 cpm)7 c.RW-WEA-RIS-14 (10-107 cpm)17.Drywell LOCA Radiation Monitor (R/Hr)-Use either one-not both.CHS-RIS-27E (1-107 R/Hr)CMS-RIS-27F (1-107 R/Hr)18.Field Data: Enter plume centerline dose rate in mR/hr and distance from Plant to the measurement location.If calculation of dose is to be based on field team radioactivity measurements, enter measurement distance and complete air sample data sheet.19.Release Duration in-minutes: Length of time the release is expected to last.120 minutes (two hours)is used as a default value.This is based on approximate time to evacuate a sector to 10 miles.20.Sample Results Attachment A-1: (Ci/m3 or pCi/cm3).If samples have been pulled and analyzed for any of the locations, (RX, DW, TG, RW or Plume Centerline) the results may be substituted into the calculations in place of the radiation monitor readings.Complete the'ppropriate columns in Attachment A-1 listing the concentrations of the thirteen (13)noble gas nuclides and five (5)radioiodines.
: 13. Radiation     Source   Term:     If     release rates are being determined by the radiation monitors,         mark   (R);     if they are based on sample results, mark (S); if   based   on field   radioactivity       samples or dose rates, mark (F).
Enter the concentrations in units of Ci/m3 or ICi/cm3 when asked to by the computer.Attachment 8 Page 3 of 4 PROCEDURE NUMBER 13.8.2 REVISION NUMBER 7 PAGE NUMBER 13.8.2-12 of 19 WP 59881(983) v OFFSITE DOSE CALCULATION DATE SHEET INSTRUCTION (Continued) 21.Summary of EDPS Calculations, Attachment C a.Enter dose rates and exposure as listed by computer output on form.b.Plume Transit Time=Distance (Ni les)Nindspeed (NPH)=Plume Transit Time (Hrs)c.Enter the time the release started.(HH:NN AN or PN)d.Completed By: Signature of individual completing Attachment C.Attachment 8 Page 4 of 4 PROCEDURE NUMBER 13.8.2 REVISION NUMBER 7 PAGE NUMBER 13.8.2-13 of 19 WP 598 RI I9 83)  
Refer to PPN 12.10 series "Post Accident Sampling and Analysis" if source term is based on samples.
: 14. 'igh     Range   Elevated     Release     Point Monitor (CNS-RIS-27C or       D) (R/hour).
Enter value     if Reactor     Buildng is release point.
Use CMS-RIS-27C     or 27D. (10 2-104 R/Hr)
: 15. Intermediate (extended) Range Noble               Gas   Radiation Monitors - Rx,   TG or RW Indicate in Panel Heter Units (PNU).
a ~   Rx REA-RIS-19A       (1-10 PNU)
: b. TG - TEA-RIS-13A (1-10 5        PHU)
C. RW   WEA-RIS-14A (1-105         PHU)
: 16. Low range   Noble Gas Radiation Monitors             Rx, TG or RW (CPM).
a,   Rx-REA-RIS-19 (10-10 7 cpm)
: b. TG-TEA-RIS-13 (10-10 7 cpm)
: c. RW-WEA-RIS-14 (10-107 cpm)
: 17. Drywell   LOCA   Radiation Monitor (R/Hr)           Use either one not both.
CHS-RIS-27E (1-107 R/Hr)
CMS-RIS-27F (1-107 R/Hr)
: 18. Field Data: Enter plume centerline dose rate in mR/hr and distance from Plant to the measurement location. If calculation of dose is to be based on field team radioactivity measurements,                 enter measurement distance and complete air sample data sheet.
: 19. Release   Duration in- minutes:           Length of time the release is expected to last. 120 minutes     (two hours) is used as a default value. This is based on   approximate time to evacuate a sector to 10 miles.
: 20. Sample     Results Attachment A-1:                 (Ci/m3 or pCi/cm3).
have been pulled and analyzed for any of the locations, (RX, DW, TG, RW If  samples or Plume Centerline) the results may be substituted into the calculations in place     of the radiation monitor readings.                 Complete the 'ppropriate columns   in Attachment A-1 listing the concentrations of the thirteen (13) noble gas nuclides and five (5) radioiodines.                     Enter the concentrations in units of Ci/m3 or ICi/cm3 when asked to by the computer.
Attachment     8 Page   3 of 4 PROCEDURE NUMBER                  REVISION NUMBER        PAGE NUMBER 13.8.2                         7                                       13.8.2-12 of   19 WP 59881(983)
 
v OFFSITE DOSE CALCULATION DATE SHEET INSTRUCTION         (Continued)
: 21. Summary of EDPS   Calculations, Attachment     C
: a. Enter dose rates and exposure as listed by computer output         on form.
: b. Plume Transit   Time = Distance (Ni les) Nindspeed     (NPH)
                                                  = Plume Transit Time (Hrs)
: c. Enter the time the release started.         (HH:NN AN or PN)
: d. Completed By:     Signature of individual completing Attachment       C.
Attachment   8 Page 4 of 4 PROCEDURE NUMBER                  REVISION NUMBER      PAGE NUMBER 13.8.2                     7                                   13.8.2-13 of 19 WP 598 RI I9 83)


==SUMMARY==
==SUMMARY==
OF EDPS OFFSITE DOSE CALCULATIONS (See Attachment 8, Item 21, for instructions) 1.2 2.0 3.0 Dose Rate REM/Hr Integrated Dose REM Dist Mhole Body[Nhole Body Thyroid Dose Rate REM/Hr Dose REM T i llle Hrs Thyroid (Plume Transit]5.0 10.0 Other Time Release Started: Completed By: (Name)Attachment C PROCEDURENUMBER 13.8.2 WP 59$R1 (9 83)REVISION NUMBER 7 PAGE NUMBER 13.8.2-14 of 19  
OF EDPS OFFSITE     DOSE CALCULATIONS (See Attachment 8, Item 21,       for instructions)
Dist     Mhole Body[ Nhole Body               Thyroid        Thyroid     (Plume      Transit]
Dose Rate      Integrated        Dose Rate             Dose          T i llle REM/Hr       Dose   REM         REM/Hr                REM              Hrs 1.2 2.0 3.0 5.0 10.0 Other Time Release   Started:
Completed By:
(Name)
Attachment   C PROCEDURENUMBER                   REVISION NUMBER      PAGE NUMBER 13.8.2                       7                                  13.8.2-14 of  19 WP 59$ R1 (9 83)
 
                                                                                      !t."QNTRQLLED CQPY 10 MILE EPZ WHOLE BODY DOSE RATE MAP ss t6~+)4+y~ 2'8 4 yy                                                                                      iayml..">> 'I ~d >
      'y)TP    '-;
      ,,j)r r4).                                                                                                                  (( I                                                                  c(zY".I>kq) Ya 4)ssA SAIS                                          ~ <<<<<<<<                                      '.I) )ISA 5
Ik
                  'JOY                                                                                                              L<<                                    <<<<L        O)SISOO I
w    P r    ROUTE 11A L55 I 8 mi.
N            5 I
                                                                                                                                                                              )Y. AYSSSI    )004
                                                                                                                                                                                                    ~
                                                                                                                                                                                                      /
        '4 I I
                                                                                                                                                                                                                        'q<<'I~'.
Eal tlag.
I<<                    .",
B B
I
                                                                                                                                              *4 tv. >pt 54p i)4;                                                                              I IISIOOIO SO.
                                                                      ')I+  yr 1g                        1Q ml.                                                                                I 4 y
                                                          ':lt'r 1
WO~WO~WO                                                                44 y44 SY Im 4)( 0 y
                                                                                                                                                                                                                            ~l444    4 2'                                                                                !~          I P;;g.t."2                                                      LTOPIA )NEST IIIL I
                                                                      'f                                        4 Sl''4 IISI                                                                                                                                                  tats.mna I<<      I            r(,r; 4,"
4(* 4  4'    :~c'2WYIY                                                  lg                    >>IS AO4'-0 It
                                                                                                                                              ';, 44~5 y.r4
                        }    X    G
                                                                                                                                            '7~'AAyy g                                  IIOAIY)O
                                                                                                                              ; '.4(    )                                                I 4
I sII 3                                                                                              ~ 422)SS
                                                                                                                                                                                              <<<< i <<<<<<<<<<<<
4                                                                                                                                                        Y r [SAN (8(
                                                                                                                                                  ~ \<<<<
425)405)5 4505 C54
                                                                                                                                                                ~ 5Y5
                                                                                                                                                                  ~ <<<< <<<<<<<<<<<<<<                          ~      LEGEND SAYSOSOAO IossOYso soAo as I
                                                                  ~ )1 8                                                    OSAYSL OOAO 55)SS                                                              gl SIV555540 Cf.        I AASA
                                                                                                                                                                <<\<<                                            Ia)tso Istss gl                      t                    0                                Oi  sas>>I.Y ststtss swea 0  al
                                                                                                                                                                                                          ~      OSS IASIS SO SIAYS CA&5, OIIO I
7 I                                                                                                EMERGENCY PLAN OICSSCIP 104ltLE ZONE MAP 890985.(001 SI89 REV 1 Attachment        0 PROCEDURE NUMBER                                      REV(S(QN NUMBER                                      PAGE NUMBER 13.8.2                                                          7                                                                        13.8.2-15 of                        19 WP.598 Rl (9 83(
 
10 MILE EPZ V/HOLE BODY iNTEGRATED DOSE MAP Si&                                                                                                                  Sl I    Sit g',eg~,    .+g
                      ', ( ~FP.,tt'*KM "t<M-      t Y&
                                                                                                                                                                                                                'hJt Atlt"'gl3 t'( @Yt                            (y Ty
              ',IO YA(&slA
                                                                                                                                    &SIOIO&31 AOUTE 11A II I 3
5mi.                                                                              S&JSSCLL SYL rt(,P. ~'I q&.
I
                                                                                                                                  , gO CASSIA MS  I                  I                                              .tl,ti&~,
                                                                                                                                '~JASJr,d y r&lc3&&YL y.d',",".-'~  1X ml.
3+ St&A't t~(
J'3I(Cyst&(It'
(/  YQ'                                                                      (      ',(&iiW&C&
g$            t CO~SO                                                (
t
                                                                                        '-('P,'':13. Ill                  (I%                                  ELTOPIA WEST AD.              I        IP Jt;      (C  Ply                                                          I~    rot sLro&(A 113~
Qc',                                      L- 'g,','Oi  P                          "Gi SIJAtAO YJ,                              JOO&&&
CIJS JYL 3                                                                                                  ~ tsrsll
(&&&W W W &W (Sr                                                                                                                  ~ JA        I 3
t Jt(
Li (Stt&SJ&
JJ&SCN
                                                                                                                                                        'W~ ~ W&&WWWW        &SYOI JIL          ~
w ee LEGEND
                                                                                                                                                                                                          &AYCO&OAO Or&OYSO AOAOOO I
t    .
C&AYSL&OAO SJJSA      I                                          81 ASIA
                                                                                                                                                                                                          &&Alt&SO
                                                                                                                                                                                                          &O(33(&A&Y IO(S&
cJJI&ssJ&cr tttsCS(SSA I                                                                                                                              ~ OS(&& IJJS&&
Ql    SSJ&SLY&Y&rtO
                                          ,3                                                                                                                                                              COO i&Jill&
(Wit(S(  Q L                                                                                                                                    sr&r&&Is&&.&ao CJJ&l 0          oi 8
                                                                                                                                                                                                                ~        Sl&
SSASAAA
                                                                                                                    )
EMERGENCY PLAN IJ(t&tt(S tt(3t                      104%LE 20NE MAP 890325 10E AJ89 REV1 Attachment                  E PROCEDURE NUMBER                                              REVISION NUMBER                 PAGE NUMBER 13.8.2                                                  7                                                                         13.8.2-16 of                            19 WP N8 Rl 19 83)
 
10 MILE EPZ THYROID DOSE RATE MAP SII I y qQ". I X ~~ Ifr  '~~ -*  <<g I Irosssosrroitw w..        -l gl                                                                    clrY, sA~'Iso ~<
                                                                                                                                  ~ WW&W
                                                                                                                                                                        ,'PIIOL l
SIICSS'BIO I
hami.              IE II0IITE 11A                                                              IE I  w.xuuAIIIIYs yak i'fs 4      r "y'j                                                                                                                                                                                          ,,I,QV>jlIAOI..I ',
            . "S; 0 I'"Yf)A,III'I>>. 1'+'
                                                                                                                                                                                                      +%A (fI'YICl lMsrr" rr                                  I srs SSIONO AO.
1X ml.                y'                                        sI I                      I I
Yf                                                          Olwr                      I E                        srf~
WO            WO~
                                                                                          ~ P                                                          ELTOPIA WE8Y RD.                  I        I W Al
                                                                'f                                                                                                                        lg IOIILIOPIA rI'+g/~                                ~ rKy";
40
                                                                                                      , y'<<,'for l
                                                                  .y
                                                                      ~~      A ISIS AOOSSS 2            O  8 I
I OAI I
S Arlrss r"-            wr&&rw&              BI V. <;
                                                                                                                                            /v                                                        SCOAII
                                                                                                                                                                                                                      ,/
Iffy rf~"
: w. ssoosfxw ASIE                                      M  .Gi
                                                                                                                                    ~ wmm r  AOfrAIJS Cw 4 w r AfrsI OIL
                                                                                                                                                                ~ IACIII%S
                                                                                                                                                          &&Mr&&                            ~
mw LEGEND AAYCO IIOAO I
SOAOYCO AOAOOS OSAYSL SOAO SfrSA AIASIAfOSI.
l1                                        jl  AASA SAIISOAO .
SOWIOAAYISICS I                                                                                                                                SOIICS Iilrss I                                                                                                                                                r llss lfsfrOOf                                                                                              y3l'-                          Pi  SOSICYSYSICM OSO Irfsisss SAICS Sy Ifs                          0 I1SIW O,                                                            'r.'ef 4
STAYS CSCL OISO I        OC I aessap      rr+                                                                                              EMEIIGENCY PLAN ps.'qQj                                                        r I>>                                                                      'Cc'/ 'f '.l,              104%LE ZONE MAP 890325.10f 4/89 REV 1 Attachment              F PROCEOURE NUMBER                                        REVISION NUMBER                      PAGE NUMBER 13.8.2                                                    7                                                                  13.8.2-17 of                                19 WP 598 RI (980)
 
10 MILE EPZ THYROID INTEGRATED DOSE MAP 110  011                                                                                                  111 f'vt<<0>>A1>>tLL ~
( <<~g <<If)P>>      << "'t~55r~tr, III ft OOS
                                                                                          '~7'                                      MWIILLtifL w It~
VCWSL  Wp 1
            >><<I                                                                        O                                                          I WXWuQIISL 5<<ag I    ~
        >>&#xc3; <
                >>M                                                                                                                                    gf                  j' 4                                                                      8 ml.                                                                        ISISSCLLISL I
W&&WWWW
            \                                                              ~ 5, >>>>, ~
w  ~IO.
3?IIIS                              I NCNwOCO 5>>
                                                                                                                          ~ Ikrtrrrhb I                                                    f&
00                                                                                IttrOS00
                                                                                                                                                                                        ~i>
I                                  IOSICQQI w.                        ~>>A", 'tiff>> fy'g 4'P4 ''>>                          1.2 ml.                                  I x,'"-                      ~4~L'85st 5;
                                            'r,
                                                  .    >>0"    t
                                                                                                                                                                          )'SJI  lewgwlwjg COASS IO.      5 5
t<<r,r gg.,f
                                                      /'g',5 5
r if ~ll CLI i.<<0>>4 Li>>44            ELTOPIA W'EST RO.              I I
5'0ll1Ql SLlCI5N I000ll0 I,t. qF'-
001  SjL
                                                                          <<"<<501                                                                                WSSl 1011%L I 8                                Q
                                                          '5
                                                                                      '"r,  ~-">>,w "f>>f~t ti gr .))5I 1CCSSS                                                            5<<
0                                                                                                                              B                      $ 01 M.
                                                                                                                    >>>>                                                              I SIIl00 I
m  Jmwm~wwawm I
0500T,    0 Y                        J I+m                                    WWW\        WW 151 I          +r                                      CSOJII autrrr N                  8 4.
                                                                                                                                      ~ +wadi                      SISCII M.
WWWWW>>'W                      ~      LEGEND tlrfoso00 0100orSO 1OAO OS
              ."-.'l 55, 8                                                  00l1101MY IIIISS A  +                                                                                                                                                                                POIISS IIIII~
pi  P<<00'rfial CSO SISLSSA awe clio t;5                                                                                  0      O, srsvs fi r  IO
                                                                                                                                                      ~rig          'I ',C>>t    5>>
EMERGENCY PLAN 104ULE ZONE fiAP 880328.10G 4/89 REV1 Attachment              G PROCEDURE NUMBER                  REVISION NUMBER                                      PAGE NUMBER 13.8.2                                7                                                                                        13.8.2-18 of                            19 W? 598 Rl (9 83)
 
CONmoLLED CopY RAOWASTE        8UILOING EXHAUST            FLOW    -  MILLIVOLT TO            CFH CONVERSION 8, Cj I
RAOHASTE BUILOING VEIITILATION uVN:mo-.FuW          C~SIe~(MEA-FH-IA, EXHAUST FANS 9..
8    ""
I O
LD C)    W C) 6 C) 8 4
5 C7
                                ~      ~                      ~ ~ ~                          ~ ~.                ~    ~        ~ ~          ~
V
                            ~                                                                          '
                                                        -J,                                ~              ...          ~ ~      ~
le  3 I
l/!
                                  ~~
                                                ~              4                      y 2
                            ""'- '"'                      ~  ~ I
                                                                                ~
                                                                                                    ~
                                                                                                      ~~
                                                                                                        ~        4
                                                                                                                      ~ ~ ~ ~
                                                                                                                            ~
                                                                                                                              ~ '
                                                                                                                                  ~
                                                                                                                                        '      ~~ ~
                                            ~        ~                                                                                    ~~ ~    ~
1-            I
                                          ~  ~  ~~          ~ ~ -  ~    ~ ~        ~ ~ ~                ~ ~ ~
0 0                                          9                100                    110              120 JI S4MIW lO llew (&tll MILLIVOLTS Attachment        H PROCEDURE NUMBER                    REVISION NUMBER              PAGE NUMBER 13.8.2                                    7                                                            13.8. 2-19 of                19 WP 59881I98Q)
 
siasns'ssstss\ el eels ~ ow an SUPPLY SYSTEM PLANT PROCf DURES MANUAL WNP-2 PROCEDURE NUMBER                                                        DATE 13.10.9                                                                03/22/90 VOLUME NAME 13          EMERGENCY PLAN IMPLEMENTING PROCEOURE SECTION 13.10        PLANT EHERGENCY    FACILITIES TITLE OPERATIONS SUPPORT CENTER OPERATIONS ANO 13.10.9      OPERATIONS SUPPORT CENTER OIRECTOR OUTIES 13.10.9.1      ~Pur ose The purpose      of this procedure is to describe the responsibilities of the Operations Support Center Oirector and the operation of the Operations Support Center.          The Service Building lunchroom will normally serve as the center.        If the need arises, the Hechanical Maintenance office space in the Service Building basement can serve as an alternate location for the Center.
13.10.9.2      References A. EPIP  13.5.1, Controlled Evacuation of the Protected Area B. EPIP  13.5.5, Personnel Accou'ntability C. EPIP  13.5.6, Personnel Search      and Rescue EPIP  13.7.8, Transportation of Injured or Contaminat:ed Injured Personnel to an Offsite Medical Facility E. EPIP  13.10.12, Reentry    Team  Outies F. EPIP  13.10.13, Recovery    Team  Outies EPIP  13.11.18, Information Network EPIP  13.13.4, Post Incident Reporting PROCEDURE NUMBER                  REVISION NUMBER    PAGE NUMBER 13.10.9                                                                    13.10.9-1 of  32 WP.591 R3 I3/BS)
 
lag 4
Bl I'
 
13.10.9.3  Procedure Res  onsibilit                                          Action Operations Support Center                Upon  notification of      an  Alert, Site    Area or Director                                General    Emergency,      or  if  so directed, pro-ceed to the Operations Support Center (OSC) and assume the Director's duties.
: 2. Obtain appropriate        briefing from the Shift Manager    (SM)    or Plant Emergency Director (PED)  on      current Plant systems status, locations and task assignments for Plant Emergency Teams (PETs), and known or antici-pated Plant hazards.
: 3.      Determine when adequate staFF and resources are in a state of readiness and the OSC can be declared        "ACTIYATED". Announce Acti-vated status to the OSC stafF and direct they assume control for their procedural responsibilities.
Announce    OSC activation to the      SM, PED, and other Plant emergency centers.
: 5. Assume  control of accountability          and  direc-tion for      any Plant emergency response        teams activated      by the Shift Manager.
NOTE:    If    certain Operations personnel (who may be    PET    members) are needed to complete critical tasks, under Control Room di rec-tion, discuss this with the SM (or PED).
When  determined, they will remain under Control Room (rather than OSC) that will be announced to them by the SM (or PED).
: 6. Direct    the    initiation of accountability operations        per    EPIP    13.5.5,    "Personnel Accountability.
: 7. For personnel          unaccounted    for,  initiate search      and      rescue    per    EPIP    13.5.6, "Personnel Search and Rescue".
: 8. Assign administrative support personnel              as defined in Attachments 0-1 through 0-13.
PROCEDURE NUMBER                REVIStON,NUMBER    PAGE NUMBER 13.10.9                      9                                        13.10.9-2 of    32 WP 59B Al (9 ID)
 
K CQNmQLLED t.QPY Res  onsibi lit                                        Action Operations Support Center          9. Maintain  a chronology of significant inputs, Director (Cont.)                          actions, events and their. resolutions on an already established log, or on a log simi-lar to the "Emergency Response Log", for attachment to your After Action R'eport.
See EPIP 13.13.4, "Post Incident Reporting".
: 10. Ensure    habitability monitoring of the          OSC has been  implemented.
ll. If the      OSC becomes  uninhabitable:
: a. Have the Lead Health Physics            Person determine    the habitability of the Hechanical Maintenance office space in the Service Building.
: b. Relocate  select    OSC  personnel    to the alternate    OSC  and  notify the Plant Emergency    Director and      other    center directors of the move.
: c. Evacuate    non-selected    OSC    personnel per instructions in EPIP 13.5.1 "Con-            .
trolled Evacuation of the Protected Area".
5
: 12. If  a  controlled or immediate evacuation is needed, refer to the appropriate section of EPIP 13.5. 5 "Personnel Accountabi 1 i ty" For guidance in accountability for emergency and  non-essential  personnel.
: 13. Direct the OSC Information Coordinator to transmit announcements over the information network that personnel          in other centers-should know.
: 14. Ensure    that the Significant Events Status Board,    similar to Attachment B, and other status boards      are    being    maintained      as necessary.
: 15. If    you    require    additional      manpower resources, contact the Plant Administrative Manager in the TSC.
PROCEDURE NUMBER                  REVISION NUMBER      PAGE NUMBER 13.10.9                      9                                    13.10.9-3 of    32 WP.SQI R1 (9 83)
 
J i'
f)
  ~h II,V
 
CQNmQLLED CQPY Res  onsibi lit                                          Action Operations Support Center          16. Initiate personnel accountability For entry Director (Cont.)                          or exit of personnel for all areas of the Protected Area, and when the PEO directs restriction of Protected Area entry or exit:
Coordinate with the Security Operations Coordinator to allow or deny entry into the Protected Area via the Primary (PAP) and Secondary Access Points (AAP).
: b. Coordinate with the Security Oper-ations  Coordinator to allow or deny exit From the Protected Area via PAP and AAP.
C. Coordinate with the Central Alarm Sta-tion, the Technical Support Center and the Control Room (or any other manned area in the Protected Area) that move.
ment of personnel      From those    areas into other areas of the Protected Area is reported to the OSC Accountability Coordinator, and that personnel receive briefing on radiological hazards, or HP support'is provided.
: 17. For medical emergencies requiring transpor-tation of individual(s) offsite, refer to EPIP  13.7.8,    "Transportation    of Injured or Contaminated      Injured    Personnel    to an Offsite Medical Facility."
: 18. Nhen  advised  by the Plant Emergency    Direc-t      tor or Shift      lIianager to initiate    reentry into radiological areas for the manipulation or modification of equipment, confer with the Lead Health Physics Person and initiate the appropriate section of EPIP 13.10.12 "Reentry Team Duties".
: 19. Keep  the Plant Emergency Director and Shift Manager    appraised oF the Reentry Team's progress.
PROCEDURE NUMBER                  REVISION NUMBER      PAGE NUMBER 13.10.9                      9                                      13.10.9-4 of  32 WP.5%I II1 (9 83)
 
I;I r,
4a
  %4 (I
  '4 a Q*
 
CQNTIRQILlED CQPY Res  onsibilit                                        Action Operations Support Center        20. When  conditions allow, have the Chemistry Director (Cont.)                          Support personnel man the Chemistry Lab.
Provide Health Physics coverage as required.
Provide additional Chemistry personnel to perform logkeeping tasks as necessary.
: 21. When    advised to have Chemistry personnel pull  PASS  samples, assign a Health Physics Technician and a PASS qualified Chemistry Technician.
: 22. When  the recovery phase of an emergency is declared and entry into radiological areas is required for manipulation or modifica-tion of equipment, confer with the Lead Health Physics Person and implement EPIP 13.10.13 "Recovery Team Duties".
: 23. Refer    incoming    media  calls to the Joint Information Center.
24 'pon      shift  change,  turn over Log and fully brief    your    relief of responsibilities, duties  and  current status.
: 25. Upon    shift  change    or termination    of the emergency:
: a. Prepare    your individual After Action Reports. Refer to EPIP 13.13.4, "Post Incident Reporting."
: b. Collect After Action Reports prepared by  staff personnel.
: c. Deliver all After Action Reports, Sta-tus Board Logs, and Significant Events Logs to the Plant Emergency Director.
Responding  OSC Support          26. Perform preassigned    duties.
Personnel
: 27. Maintain a chronology oF significant inputs, actions, events and their resolutions on an already established log, or on a log similar to the "Emergency Response Log", For attach-ment to your AFter Action Report.          See EPIP 13.13.4, "Post Incident Reporting."
: 28. Perform other assignments      as directed.
PROCEDURE NUMBER                  REVISION NUMBER      PAGE NUMBER 13.10.9                      9                                      13.10.9-5 of  32 WP 598 Rl (9 83)
 
4
,h II
 
13.10.9.4  Attachments A,  Emergency Team Tracking Log B. Significant    Events Log C. Operations Support Center Activation Cards D. Operations Support Center Administrative Staff E. Service Building Checkout Log F. Operations Support Center Floor Plan G. Operations Support Center Oirector Checklist PROCEDURE NUMBER                REVISlQN NUMBER    PAGE NUMBER 13.10.9                      9                        13.10.9-6 of 32 V/P 598 Rl (083)
 
EMERGENCY TEAM TRACKING LOG I              I        I                                I      I      I I              I        I                                ILEAVE EVENTITEAM MEMBERS/I LEAVEI OESTINATION        PHONE  IARRIVEI  WORK IARRIVEI    COMMENTS NO.      TITLE        OSC                      NO. OEST. AREA  OSC Attachment    A PROCEDURENUMBER                REVISIQN NUMBER    PAGE NUMBER 13.10.9                    9                                  13.10.9-7 of 32 WP 599 R1 (999I
 
t '
Cqp
 
OPERATIONS SUPPORT CENTER SIGNIFICANT EVENTS STATUS BOARD DATE:                                              RECORDER:
TIME                        EVENT                          STATUS Attachment  8 PRQCEOURE NUMBER              REVISION NUMBER      PAGE NUMBER 13.10.9                    9                              13.10.9-8 ot: 32 V(P 598 R1 (983)
 
1I OPERATIONS SUPPORT CENTER ACTIVATION CAROS C-1 Person  in Charge C-2 Equipment Person C-3 Radiological Monitor    A C-4 Radiological Monitor    B C-5 Accountability    Person Attachment    C Page  1 of 6 PROCEDURE NUMBER      REVISION NUMBER    PAGE NUMBER 13.10.9              9                            13.10.9-9 of 32 WP 598 R1(983)
 
e l'


!t."QNTRQLLED CQPY 10 MILE EPZ-WHOLE BODY DOSE RATE MAP ss 4 yy'y)TP'-;,,j)r r4).'JOY t6~+)4+y~2'8w P r ROUTE 11A SAIS iayml..">>'I~d>((I L<<I~<<<<<<<<L55 I 5 Ik<<<<L'.I))ISA O)SISOO c(zY".I>kq)Ya 4)ssA'4 I 8 mi.~/<<<<<<<<<<<<N 5)Y.AYSSSI)004 I I I<<B B I'q Eal tlag..",<<'I~'." WO~WO~WO}X G')I+yr 1g'f Sl''4':lt'r IISI It tv.>pt 54p i)4;44 y44 SY 1Q ml.4 y'P;;g.t."2 2 4 4(*4 4'*4:~c'2WYIY';, 44~5 y.r4 I IISIOOIO SO.I 1!~I Im LTOPIA)NEST IIIL I tats.mna I<<I lg 4)(0 y~l444 4 r(,r;4,">>IS AO4'-0 3;'.4()4'7~'AAyy g IIOAIY)O I I sII i~422)SS<<<<<<<<<<<<<<<<4 (8(Y r[SAN~)1 I 55)SS SIV555540 Cf.I swea I OICSSCIP gl AASA gl 0 al~\<<<<8 t 425)405)5 4505 C54~5Y5~<<<<<<\<<0 7<<<<<<<<<<<<<<LEGEND~SAYSOSOAO IossOYso soAo as OSAYSL OOAO Ia)tso Istss Oi sas>>I.Y ststtss OSS IASIS SO~SIAYS CA&5, OIIO I EMERGENCY PLAN 104ltLE ZONE MAP 890985.(001 SI89 REV 1 Attachment 0 PROCEDURE NUMBER 13.8.2 REV(S(QN NUMBER 7 PAGE NUMBER 13.8.2-15 of 19 WP.598 Rl (9 83(
OPERATIONS SUPPORT CENTER ACTIVATION CARDS Activation    Card  gl:    Person  in Char  e A. Coordinate activation of Operations Support                  Center  functions. Direct setup similar to Attachment F, OSC Floor Plan.
10 MILE EPZ-V/HOLE BODY iNTEGRATED DOSE MAP Si&Sl I Sit g',eg~,.+g', (~FP.,tt'*KM"t<M-t Y&'(@Yt t',IO YA(&slA (y Ty AOUTE 11A&SIOIO&31'hJt Atlt"'gl3 3 5mi.rt(,P.~'I q&., gO CASSIA MS I r&lc3&&Y L'~JASJr,d y I S&JSSCLL SYL I I I I.tl,ti&~, CO~SO (/YQ'g$Qc', y.d',",".-'~
B. Assign Activation Cards sequentially to responding personnel, attempting to give card 45 to one familiar with Personnel Accountability Observe any special instructions on each card.                  Ensure the actions are being carried out.
1X ml.3+St&A't (t'-('P,'':13.
C. Ensure  that all arriving personnel log in via the manual accountability log system.      Direct emergency personnel to the equipment lockers area, and nonessential personnel to the other side of the room.
Ill Jt;113~L-'g,','Oi P t~((t (I%(C Ply J'3I(Cyst&(It'
: 0. Instruct arwiving emergency personnel to remain in the Operations Support Center    until directed otherwise.                 Instruct arriving non-essential evacuation/assembly        personnel to remain in the GSB hallway or other locations out of the way of the entrance to the OSC.
',(&iiW&C&"Gi ELTOPIA WEST AD.I IP I~rot sLro&(A YJ, (Sr JOO&&&3'!'SIJAtAO CIJS JYL~tsrsll (&&&W W W&W~JA I t.t Jt(I SJJSA I cJJI&ssJ&cr I tttsCS(SSA
E. Notify the Control      Room and    the Technical Support Center of your arrival, name,   emergency    organization assignment          and the status of the Operations Support Center.      Keep the Shift Manager and the Plant Emergency Director informed of operational status.
,3 (Wit(S(Q CJJ&l L Li 81 ASIA 0 oi SSASAAA)(Stt&SJ&JJ&SCN'W~~IJ(t&tt(S tt(3t&SYOI JIL W&&WWWW 3 LEGEND~&AYCO&OAO w ee Or&OYSO AOAOOO C&AYSL&OAO&&Alt&SO&O(33(&A&Y IO(S&~OS(&&IJJS&&Ql SSJ&SLY&Y&rtO COO i&Jill&8 sr&r&&Is&&.&ao~Sl&EMERGENCY PLAN 104%LE 20NE MAP 890325 10E AJ89 REV1 Attachment E PROCEDURE NUMBER 13.8.2 REVISION NUMBER 7 PAGE NUMBER 13.8.2-16 of 19 WP N8 Rl 19 83)  
F. Establish contact with the.              Shift    Support Supervisor      and  provide information on personnel status          and  support as requested.
G. Properly brief and      be  relieved by the Operations Support Center Director upon  his arrival.
Attachment    C Page  2 of  6 PROCEDURE NUMBER                  REVISION NUMBER        PAGE NUMBER 13.10.9                        9                                      13.10.9-10 of 32 WP 598 Rl (083)
 
g d 0k!a~
 
Activation    Card g2:    E  ui ment Person    2nd  Arrivin  Emer enc    Res onse Person)
A. If a Health Physics person with locker and cabinet keys is not available, proceed to Access Control and obtain Operations Support Center emergency equipment locker and emerge'ncy supplies cabinet keys from the key box.
B. Return to Operations Support Center .,and unlock the Operations Support Center emergency equipment locker and emergency supplies cabinet. Remove and  set  up overhead    projector.
C. Oistribute Significant Events      Logs  to overhead projector location.
: 0. Remove  radio(s), charger(s),    and base  unit. Plug  in.
E. Assist person in charge      as needed.
F. Obtain the key from the inside of the cabinet door for the telephone box. Unlock the box and remove phones.          Place all equipment in accor-dance with locations similar to Operations Support Center Floor Plan.
                  ',Refer to diagram Attachment F.
Attachment    C Page  3  of 6 PROCEDURE NUMBER                  REVISIGN NUMBER    PAGE NUMBER 13.10.9                      9                                    13.10.9-11 of 32 WP 598 Rl (983)
 
9
~at~
I'
 
SPECIAL INSTRUCTIONS:          Assign this card to the              f i rs t available      Health Physics person arriving.-
Activation    Card g3      Health  Ph sics Tech.      A A. Obtain    portable monitoring equipment              from    the    .cabinet.      Perform operational checks on equipment before using.
B. As  directed by the Lead HP, if a radiological release is in progress to the environment,      or if there is a reason to .believe contamination control is in question, establish contamination control points at Access Control, the Service Building entrance, and the Operations Support Center entrance.
Survey personnel in the Center that were not surveyed for contamination as they entered.       Segregate any personnel found contaminated.               The portal monitors in HP Access Control may be utilized to expedite contamination monitoring of personnel if conditions permit.
C. As" directed by the      Lead HP,  or  if a  radiological release is in progress to the environment,        restrict  access    through the Maintenance        Shop  South roll-up door    and  the  441'evel      IKC Shop  North door.
: 0. Make  arrangements    for personnel decontamination        as necessary.
Maintain a continuous surveillance oF the radiological habitability of
.                       the Center (dose rate and airborne levels and periodically perform
                                      =
contamination surveys).           The center dose        rates should be monitored utilizing portable Area Radiation Monitors and the airborne levels should be monitored utilizing a portable Continuous Air Monitor (CAM) . Keep the Operations Support Center Oirector informed.
Brief the  Lead Health Physics      Person upon his    arrival.
Attachment    C Page  4 of 6 PRCCEOURE NUMBER                  REVISION NUMBER      PAGE NUMBER 13.10.9                      9                                        13.10.9-12    oF 32 wP.59s Rl I9 83)
 
~1 t
Vi'
 
CQNTRQLLED CQPY SPECIAL INSTRUCTIONS:          Assign this card to the            second    available  Health Physics person a rri ving.
Activation  Card 44:    Health  Ph sics Tech. S A. If, Plant Emergency Teams      or Reentry Teams are to be dispatched, assist team members with dress        out (in anti-Cs or fire gear), and obtaining emergency dosimetry.
B. When  assisting team members that are being dispatched into areas -with a potential for airborne radioiodine exposure, check protective clothing to insure  no  skin areas are exposed.
C. Perform the      following duties      until relieved      by    the  Health  Physics Logkeeper.
o    Oistribute    emergency dosimetry and keep a log        of exposure history.
o    Read  and  log in pencil dosimeters        and  estimated    dose  from returning teams.
Attachment    C Page  5 of  6 PROCEDURE NUMBER                    REVIS/ONNUMBER      PAGE NUMBER 13.10.9                      9                                      13.10.9-13 of  32 WP 598 11 (9 83)
 
t P"
y 0
Ap  ht14
 
Activation  Card g5:    Accountabilit Person Refer to EPIP 13.5.5 "Personnel Accountability" Attachment        A and implement "Activation Card 45 Accountability Duties".
Attachment    C Page  6 of 6 PROCEOURE NUMBER          REVISION NUMBER    PAGE NUMBER 13.10.9                    9                                13.10.9-14 of 32 wP 5S88I (9%I
 
'Eo >
~"
 
OPERATIONS SUPPORT CENTER ADMINISTRATION STAFF DUTIES D-1      Significant    Events Logkeeper D-2      Team  Tracking Locator 0-3      Radio Communicator 0-4       Phone Communicator 0-5       Information Coordinator 0-6      Stenographer 0-7       Records Coordinator 0-8      Health Physics Logkeeper 0-9      Accountability Coordinator 0-10      Team  Briefer/Debriefer D-ll      Dosimetry Support 0-12    Warehouse    Coordinator 0-13      Security. Operations Coordinator Attachment 0 PROCEDURE NUMBER          AEVISIQN NUMBER      PAGE NUMBER 13.10.9                  9                            13.10.9-15 of 32 WP 59$ Rl (983)
 
4 0
 
Duties of:      0 erations      Su    ort Center  Si nificant  Events Lo kee er Assignment Location:          0  erations  Su    ort Center Report to:    0  erations      Su    ort Center Director Activation Level: Alert Res  onsibi  lities
: 1. Maintain the Significant Events Board,                similar to Attachment    8  (i.e.,
status board via overhead projection).
: 2. When    full, file the log in a notebook for the briefing of incoming personnel.      Preserve the log for After Action Reports at the termination of. the emergency.
: 3. Assist with other administrative duties              as  directed by Operations Support Center Director.
: 4. Upon shift change,          fully brief    your  relief  on  responsibilities, duties, and current status.
: 5. Upon  shift  change    or termination of the emergency:
: a. Prepare an individual After Action Report.                Refer to EPIP -13.13.4, "Post Incident Reporting."
: b. Deliver all After Action Reports to the            OSC Director.
Attachment O-l PROCEDURE NUMBER                      REVISION NUMBER        PAGE NUMBER 13.10.9                          9                                    13.10.9-16 of  32 wP 5%I R l I9 83)
 
t
    ', lg 5
0
 
Duties of:      0 erations      Su    ort Center  Team Trackin    Locator Assignment Location:          0  erations  Su  ort Center Report  to:    0 erations      Su    ort Center Director Activation Level:        Alert Res  onsibi lities
: 1. Haintain the    Team    Location Status Board    up to date.
: 2. When    Full, make a log copy of the status board similar to Attachment A.
Maintain the log for future reconstruction documentation upon termination of the emergency.
: 3. Assist the Operations 'Support Center Director in                team  control and  other administrative duties as directed.
: 4. Assist the Radio Communicator and/or              Phone. Communicator    in maintaining contact with the teams on assignment.
: 5. Upon shift change,           Fully brief your relief      on  responsibilities, duties, and current status.
: 6. Upon  shift  change    or termination of the emergency:
: a. Prepare  an    individual After Action Report.          Refer to EPIP 13.13.4, "Post Incident Reporting."
: b. Deliver all After Action Reports to the          OSC  Director.
Attachment 0-2 PROCEDURE NUMBER                  REVISION NUMBER        PAGE NUMBER 13.10.9                          9                                    13.10.9-17 of  32 WP 59$ Rl(983)
 
1
  'I i
I ih
 
Duties of:      0  erations      Su    ort Center    Radio Communicator Assignment Location:            0  erations    Su  ort Center Report to:        0  erations      Su    ort  Center Director Activation Level:          Alert, Res    onsibilities 1... Set      up    and    maintain        radio    communications      with dispatched    teams as necessary.
: 2.      Maintain a radio traffic log so that requests                  for equipment or action can be relayed and tracked accurately.
3:  =  assi'st the, Team Tracking Locator.
: 4.   . Coordinate with the ,Operations              Support.,Center    Director in communicating duties  and  directions to        each team.
: 5.      Relay team      messages        to  the    Operations    Support    Center  Director  as necessary.
: 6.      Assist the Operations            Support Center Director with other administrative duties as directed.
: 7.       Upon shift change,           fully brief      your  relief  on  responsibilities, duties, and current status.
: 8.      Upon  shift  change or      termination of the emergency:
: a. Prepare an individual After Action Report.                    Refer to EPIP 13.13.4, "Post Incident Reporting."
: b. Deliver all After Action Reports              and Logs  to the  OSC  Director.
Attachment 0-3 ROCEDURE NUMBER                    REVISION NUMBER          PAGE NUMBER 13.10.9                              9                                      13.10.9-18 of  32 WP 598 R1(9aII
 
Duties of:      0 erations      Su  ort Center  Phone Communicator Assignment Location:          0  erations  Su  ort Center Report .to:    0 erations      Su  ort Center Director Activation Level:        Alert Res  onsibi lities
: l. Act as the phone communicator for the Operations Support Center Director.
2 ~   Assist the      Team    Tracking  Locator    if teams. are  utilizing  phones  for communications.
: 3. Assist with other administrative duties          as  directed by Operations Support Center Director.
: 4. Upon  shift  change,      brief your relief    on  responsibilities, duties, and current status.
: 5. Upon  shift  change    or termination of the emergency:
: a. Prepare    an  individual After Action Report.        Refer to EPIP 13.13.4, "Post Incident Reporting."=
                      'b. Deliver all After Action Reports to the          OSC Director.
Attachment D-4 PRGCECURE NUMBER                    REVIStON NUMBER      PAGE NUMBER 13.10.9                        9                                  13.10.9-19 of 32 WP.SQB Rl (9 83)
 
A I
S~"
qi
  '(
 
Duties of:  0  erations    Su  ort Center Information Coordinator Assignment Location:      0  erations  Su  ort Center Report to:  0  erations    Su  ort Center Director Activation Level:    Alert Res onsibilities Implement duties as directed in EPIP 13.11.18 "Information Network".
Attachment D-5 PROCEOURE NUMBER                REVISiON NUMBER      PAGE NUMBER 13.10.9                      9                                13.10.9-20 of 32 WP.598 R I (9 83)
 
L I
            .ILr
        +I N
I, 4*A%  s
 
CQNmQLLED CQPY Duties of:      0 erations      Su    ort Center  Steno ra her Assignment Location:          0  erations  Su  ort Center Report    to:    0 erations      Su    ort Center Director Activation Level:        Alert Res  onsibi lities
: 1.      Maintain    a  log of all major events and activities involving the                OSC Director or his designee, with emphasis on:
: a. Receipt of notifications of changes            in emergency classification.
: b. The  content of briefings and the identity of persons              with whom he interfaces.
: c. Significant telephone conversations.
: d. The  input    and  orders for decisions made.
: e. Any  entry at his request.
: 2.      Perform other duties as, requested          by the  OSC  Director or his designee.
: 3.     Upon  shift  change:
: a. Fully brief your relief of responsibilities,                  duties  and current status.
: b.  ,Forward your log to the          OSC  Director.
: 4.      Upon  shift    change    or termination of the emergency:
: a. Prepare    an  individual After Action Report.          Refer to EPIP 13.13.4, "Post Incident Reporting;"
: b. Deliver all After Action Reports to the            OSC Director.
: 5. Upon    termination of the emergency,            provide the    OSC Director with any required After Action Report typing            and  report consolidation needed.
Attachment 0-6 PROCEDURE NUMBER                       REVISION NUMBER       PAGE NUMBER 13.10.9                          9                                    13.10.9-21 of 32 Wp 598 III (9'aI)


-10 MILE EPZ-THYROID DOSE RATE MAP"y'j yak i'fs 4 r."S;I y qQ".I X~~I fr'~~-*<<g l II 0IITE 11A hami.IE IE SII gl I~WW&W I w.xuuAIIIIYs I Irosssosrroitw w..-l ,'PIIOL SIICSS'BIO clrY, sA~'Iso~<,,I,QV>jlIAOI..I
', 0 I'" Yf)A,II I'I>>.1'+'+%A (fI'YI Cl lM srr" rr I srs WO WO~1X ml., Yf~P W Al y'SSIONO AO.sI I I I E wr srf~Ol I ELTOPIA WE8Y RD.I I'f rI'+g/~~rKy";, y'<<,'for 40 l IOIILIOPIA lg ps.'qQj I SfrSA AIASIAfO SI.I llss lfsfrOOf SAICS Sy.y~~AOOSSS A ISIS l 1 I Ifs I aessap rr+r I>>jl AASA 0 O, I1SIW 2 O/v Iffy r f~" r AfrsI OIL AOfrAIJS~w m m Cw 4 w r 8 I OAI I I Arlrss S r"-wr&&rw&SCOAII BI V.<;,/w.ssoosfxw ASIE~IACII I%S&&Mr&&y3l'-'r.'ef'Cc'/'f'.l, M.Gi LEGEND~AAYCO IIOAO m w SOAOYCO AOAOOS OSAYSL SOAO SAIISOAO.SOWIOAAY ISICS SOIICS Iilrss r Pi SOSICYSYSICM OSO Irfsisss STAYS CSCL OISO 4 I OC EMEIIGENCY PLAN 104%LE ZONE MAP 890325.10f 4/89 REV 1 Attachment F PROCEOURE NUMBER 13.8.2 REVISION NUMBER 7 PAGE NUMBER 13.8.2-17 of 19 WP 598 RI (980) 10 MILE EPZ-THYROID INTEGRATED DOSE MAP 110 011 111 f'vt<<0>>A1>>tLL
~(<<~g<<If)P>><<"'t~55r~tr,>><<I 5<<ag OOS III ft'~7'VCWSL Wp 1 O MW IILL tifL I WXWuQIISL I~w It~>>&#xc3;<>>M 4\5>>00 x,'"-5;'r, t<<r,r~5,>>>>,~4'P4''>>~4~L'85st.>>0" t gg.,f/'g',5<<"<<501 8 ml.1.2 ml.5 if CLI I I r~ll i.<<0>>4 Li>>44 3?IIIS~I Ikrtrrrhb IttrOS00 gf j'ISISSCLLISL I W&&WWWW w~IO.I NCNwOCO f&~i>IOSICQQI w.~>>A",'tiff>>fy'g 5 I000ll0 WSSl 1011%L I 8 1Ql SLlCI5N I 5'0ll I,t.qF'-001 SjL Q)'SJI lewgwlwjg COASS IO.5 OPIA W'EST RO.I ELT 0 1CCSSS'5'"r,~-">>,w"f>>f~t ti gr.))5I 5<<>>>>B$01 M.I I SIIl00 m Jmwm~wwawm I 151 Y I+m I 0500T, 0 J+r autrrr N WWW\WW CSOJII 8 4.55,."-.'l A+t;5 r IO 0 O, fi~+wadi 8 SISCII M.WWWWW>>'W~rig'I',C>>t 5>>LEGEND~tlrfoso00 0100orSO 1OAO OS 00l1101MY IIIISS POIISS IIIII~pi P<<00'rfial CSO SISLSSA srsvs awe clio EMERGENCY PLAN 104ULE ZONE fiAP 880328.10G 4/89 REV1 Attachment G PROCEDURE NUMBER 13.8.2 REVISION NUMBER 7 PAGE NUMBER 13.8.2-18 of 19 W?598 Rl (9 83)
CONmoLLED CopY RAOWASTE 8UILOING EXHAUST FLOW-MILLIVOLT TO CFH CONVERSION RAOHASTE BUILOING VEIITILATION EXHAUST FANS (MEA-FH-IA, 8, Cj uVN:mo-.FuW C~SIe~......I 9..8"" I O LD C)W C)6 C)8 4 5 C7~~~~~~~.~~~~~V~'-J,~...~~~le I l/!3~~~4 y~~~~~~~~''~~~2""'-'"'~~I~~4~~~~~~~~1-I~~~~~~-~~~~~~~~~0 0 9 100 110 120 JI S4MIW lO llew (&tll MILL I VOLTS Attachment H PROCEDURE NUMBER 13.8.2 REVISION NUMBER 7 PAGE NUMBER 13.8.2-19 of 19 WP 59881I98Q)
PROCEDURE NUMBER 13.10.9 siasns'ssstss\
el eels~ow an SUPPLY SYSTEM PLANT PROCf DURES MANUAL WNP-2 DATE 03/22/90 VOLUME NAME 13 SECTION EMERGENCY PLAN IMPLEMENTING PROCEOURE 13.10 PLANT EHERGENCY FACILITIES TITLE OPERATIONS SUPPORT CENTER OPERATIONS ANO 13.10.9 OPERATIONS SUPPORT CENTER OIRECTOR OUTIES 13.10.9.1~Pur ose The purpose of this procedure is to describe the responsibilities of the Operations Support Center Oirector and the operation of the Operations Support Center.The Service Building lunchroom will normally serve as the center.If the need arises, the Hechanical Maintenance office space in the Service Building basement can serve as an alternate location for the Center.13.10.9.2 References A.B.C.E.F.EPIP 13.5.1, Controlled Evacuation of the Protected Area EPIP 13.5.5, Personnel Accou'ntability EPIP 13.5.6, Personnel Search and Rescue EPIP 13.7.8, Transportation of Injured or Contaminat:ed Injured Personnel to an Offsite Medical Facility EPIP 13.10.12, Reentry Team Outies EPIP 13.10.13, Recovery Team Outies EPIP 13.11.18, Information Network EPIP 13.13.4, Post Incident Reporting PROCEDURE NUMBER 13.10.9 WP.591 R3 I3/BS)REVISION NUMBER PAGE NUMBER 13.10.9-1 of 32 lag 4 Bl I' 13.10.9.3 Procedure Res onsibilit Action Operations Support Center Director Upon notification of an Alert, Site Area or General Emergency, or if so directed, pro-ceed to the Operations Support Center (OSC)and assume the Director's duties.2.Obtain appropriate briefing from the Shift Manager (SM)or Plant Emergency Director (PED)on current Plant systems status, locations and task assignments for Plant Emergency Teams (PETs), and known or antici-pated Plant hazards.3.Determine when adequate staFF and resources are in a state of readiness and the OSC can be declared"ACTIYATED".
Announce Acti-vated status to the OSC stafF and direct they assume control for their procedural responsibilities.
Announce OSC activation to the SM, PED, and other Plant emergency centers.5.Assume control of accountability and direc-tion for any Plant emergency response teams activated by the Shift Manager.6.NOTE: If certain Operations personnel (who may be PET members)are needed to complete critical tasks, under Control Room di rec-tion, discuss this with the SM (or PED).When determined, they will remain under Control Room (rather than OSC)that will be announced to them by the SM (or PED).Direct the initiation of accountability operations per EPIP 13.5.5,"Personnel Accountability.
7.For personnel unaccounted for, initiate search and rescue per EPIP 13.5.6,"Personnel Search and Rescue".8.Assign administrative support personnel as defined in Attachments 0-1 through 0-13.PROCEDURE NUMBER 13.10.9 REVIStON,NUMBER 9 PAGE NUMBER 13.10.9-2 of 32 WP 59B Al (9 ID)
K CQNmQLLED t.QPY Res onsibi lit Action Operations Support Center Director (Cont.)9.Maintain a chronology of significant inputs, actions, events and their.resolutions on an already established log, or on a log simi-lar to the"Emergency Response Log", for attachment to your After Action R'eport.See EPIP 13.13.4,"Post Incident Reporting".
10.Ensure habitability monitoring of the OSC has been implemented.
ll.If the OSC becomes uninhabitable:
a.Have the Lead Health Physics Person determine the habitability of the Hechanical Maintenance office space in the Service Building.b.Relocate select OSC personnel to the alternate OSC and notify the Plant Emergency Director and other center directors of the move.c.Evacuate non-selected OSC personnel per instructions in EPIP 13.5.1"Con-.trolled Evacuation of the Protected Area".5 12.If a controlled or immediate evacuation is needed, refer to the appropriate section of EPIP 13.5.5"Personnel Accountabi 1 i ty" For guidance in accountability for emergency and non-essential personnel.
13.Direct the OSC Information Coordinator to transmit announcements over the information network that personnel in other centers-should know.14.Ensure that the Significant Events Status Board, similar to Attachment B, and other status boards are being maintained as necessary.
15.If you require additional manpower resources, contact the Plant Administrative Manager in the TSC.PROCEDURE NUMBER 13.10.9 REVISION NUMBER 9 PAGE NUMBER 13.10.9-3 of 32 WP.SQI R1 (9 83)
J i'f)~h II,V CQNmQLLED CQPY Res onsibi lit Action Operations Support Center Director (Cont.)16.Initiate personnel accountability For entry or exit of personnel for all areas of the Protected Area, and when the PEO directs restriction of Protected Area entry or exit: Coordinate with the Security Operations Coordinator to allow or deny entry into the Protected Area via the Primary (PAP)and Secondary Access Points (AAP).b.Coordinate with the Security Oper-ations Coordinator to allow or deny exit From the Protected Area via PAP and AAP.C.Coordinate with the Central Alarm Sta-tion, the Technical Support Center and the Control Room (or any other manned area in the Protected Area)that move.-ment of personnel From those areas into other areas of the Protected Area is reported to the OSC Accountability Coordinator, and that personnel receive briefing on radiological hazards, or HP support'is provided.17.For medical emergencies requiring transpor-tation of individual(s) offsite, refer to EPIP 13.7.8,"Transportation of Injured or Contaminated Injured Personnel to an Offsite Medical Facility." 18.Nhen advised by the Plant Emergency Direc-t tor or ShiftlIianager to initiate reentry into radiological areas for the manipulation or modification of equipment, confer with the Lead Health Physics Person and initiate the appropriate section of EPIP 13.10.12"Reentry Team Duties".19.Keep the Plant Emergency Director and Shift Manager appraised oF the Reentry Team's progress.PROCEDURE NUMBER 13.10.9 REVISION NUMBER 9 PAGE NUMBER 13.10.9-4 of 32 WP.5%I II1 (9 83)
I;I r, 4a%4 (I'4 a Q*
CQNTIRQILlED CQPY Res onsibilit Action Operations Support Center Director (Cont.)20.When conditions allow, have the Chemistry Support personnel man the Chemistry Lab.Provide Health Physics coverage as required.Provide additional Chemistry personnel to perform logkeeping tasks as necessary.
21.When advised to have Chemistry personnel pull PASS samples, assign a Health Physics Technician and a PASS qualified Chemistry Technician.
22.When the recovery phase of an emergency is declared and entry into radiological areas is required for manipulation or modifica-tion of equipment, confer with the Lead Health Physics Person and implement EPIP 13.10.13"Recovery Team Duties".23.Refer incoming media calls to the Joint Information Center.24'pon shift change, turn over Log and fully brief your relief of responsibilities, duties and current status.25.Upon shift change or termination of the emergency:
a.Prepare your individual After Action Reports.Refer to EPIP 13.13.4,"Post Incident Reporting." b.Collect After Action Reports prepared by staff personnel.
Responding OSC Support Personnel 26.27.c.Deliver all After Action Reports, Sta-tus Board Logs, and Significant Events Logs to the Plant Emergency Director.Perform preassigned duties.Maintain a chronology oF significant inputs, actions, events and their resolutions on an already established log, or on a log similar to the"Emergency Response Log", For attach-ment to your AFter Action Report.See EPIP 13.13.4,"Post Incident Reporting." 28.Perform other assignments as directed.PROCEDURE NUMBER 13.10.9 REVISION NUMBER 9 PAGE NUMBER 13.10.9-5 of 32 WP 598 Rl (9 83) 4 ,h II 13.10.9.4 Attachments A, B.C.D.Emergency Team Tracking Log Significant Events Log Operations Support Center Activation Cards Operations Support Center Administrative Staff E.Service Building Checkout Log F.Operations Support Center Floor Plan G.Operations Support Center Oirector Checklist PROCEDURE NUMBER 13.10.9 REVISlQN NUMBER 9 PAGE NUMBER 13.10.9-6 of 32 V/P 598 Rl (083)
EMERGENCY TEAM TRACKING LOG I I I I I I EVENTITEAM MEMBERS/I LEAVEI OESTINATION I I I ILEAVE PHONE IARRIVEI WORK IARRIVEI COMMENTS NO.TITLE OSC NO.OEST.AREA OSC Attachment A PROCEDURENUMBER 13.10.9 WP 599 R1 (999I REVISIQN NUMBER 9 PAGE NUMBER 13.10.9-7 of 32 t'Cqp OPERATIONS SUPPORT CENTER SIGNIFICANT EVENTS STATUS BOARD DATE: RECORDER: TIME EVENT STATUS Attachment 8 PRQCEOURE NUMBER 13.10.9 REVISION NUMBER 9 PAGE NUMBER 13.10.9-8 ot: 32 V(P 598 R1 (983) 1I OPERATIONS SUPPORT CENTER ACTIVATION CAROS C-1 Person in Charge C-2 Equipment Person C-3 Radiological Monitor A C-4 Radiological Monitor B C-5 Accountability Person Attachment C Page 1 of 6 PROCEDURE NUMBER 13.10.9 REVISION NUMBER 9 PAGE NUMBER 13.10.9-9 of 32 WP 598 R1(983) e l' OPERATIONS SUPPORT CENTER ACTIVATION CARDS Activation Card gl: Person in Char e A.Coordinate activation of Operations Support Center functions.
Direct setup similar to Attachment F, OSC Floor Plan.B.Assign Activation Cards sequentially to responding personnel, attempting to give card 45 to one familiar with Personnel Accountability Observe any special instructions on each card.Ensure the actions are being carried out.C.Ensure that all arriving personnel log in via the manual accountability log system.Direct emergency personnel to the equipment lockers area, and nonessential personnel to the other side of the room.0.Instruct arwiving emergency personnel to remain in the Operations Support Center until directed otherwise.
Instruct arriving non-essential evacuation/assembly personnel to remain in the GSB hallway or other locations out of the way of the entrance to the OSC.E.Notify the Control Room and the Technical Support Center of your arrival, name, emergency organization assignment and the status of the Operations Support Center.Keep the Shift Manager and the Plant Emergency Director informed of operational status.-F.Establish contact with the.Shift Support Supervisor and provide information on personnel status and support as requested.
G.Properly brief and be relieved by the Operations Support Center Director upon his arrival.Attachment C Page 2 of 6 PROCEDURE NUMBER 13.10.9 REVISION NUMBER 9 PAGE NUMBER 13.10.9-10 of 32 WP 598 Rl (083) g d 0k!a~
Activation Card g2: E ui ment Person 2nd Arrivin Emer enc Res onse Person)A.If a Health Physics person with locker and cabinet keys is not available, proceed to Access Control and obtain Operations Support Center emergency equipment locker and emerge'ncy supplies cabinet keys from the key box.B.Return to Operations Support Center.,and unlock the Operations Support Center emergency equipment locker and emergency supplies cabinet.Remove and set up overhead projector.
C.Oistribute Significant Events Logs to overhead projector location.0.Remove radio(s), charger(s), and base unit.Plug in.E.Assist person in charge as needed.F.Obtain the key from the inside of the cabinet door for the telephone box.Unlock the box and remove phones.Place all equipment in accor-dance with locations similar to Operations Support Center Floor Plan.',Refer to diagram Attachment F.Attachment C Page 3 of 6 PROCEDURE NUMBER 13.10.9 REVISIGN NUMBER 9 PAGE NUMBER 13.10.9-11 of 32 WP 598 Rl (983) 9~at~I' SPECIAL INSTRUCTIONS:
Assign this card to the f i rs t available Health Physics person arriving.-
Activation Card g3 Health Ph sics Tech.A A.Obtain portable monitoring equipment from the.cabinet.Perform operational checks on equipment before using.B.As directed by the Lead HP, if a radiological release is in progress to the environment, or if there is a reason to.believe contamination control is in question, establish contamination control points at Access Control, the Service Building entrance, and the Operations Support Center entrance.Survey personnel in the Center that were not surveyed for contamination as they entered.Segregate any personnel found contaminated.
The portal monitors in HP Access Control may be utilized to expedite contamination monitoring of personnel if conditions permit.C.As" directed by the Lead HP, or if a radiological release is in progress to the environment, restrict access through the Maintenance Shop South roll-up door and the 441'evel IKC Shop North door.0.Make arrangements for personnel decontamination as necessary.
.Maintain a continuous surveillance oF the radiological habitability of the Center=(dose rate and airborne levels and periodically perform contamination surveys).The center dose rates should be monitored utilizing portable Area Radiation Monitors and the airborne levels should be monitored utilizing a portable Continuous Air Monitor (CAM).Keep the Operations Support Center Oirector informed.Brief the Lead Health Physics Person upon his arrival.Attachment C Page 4 of 6 PRCCEOURE NUMBER 13.10.9 REVISION NUMBER 9 PAGE NUMBER 13.10.9-12 oF 32 wP.59s Rl I9 83)
~1 t Vi' CQNTRQLLED CQPY SPECIAL INSTRUCTIONS:
Assign this card to the second available Health Physics person a rri ving.Activation Card 44: Health Ph sics Tech.S A.If, Plant Emergency Teams or Reentry Teams are to be dispatched, assist team members with dress out (in anti-Cs or fire gear), and obtaining emergency dosimetry.
B.When assisting team members that are being dispatched into areas-with a potential for airborne radioiodine exposure, check protective clothing to insure no skin areas are exposed.C.Perform the following duties until relieved by the Health Physics Logkeeper.
o Oistribute emergency dosimetry and keep a log of exposure history.o Read and log in pencil dosimeters and estimated dose from returning teams.Attachment C Page 5 of 6 PROCEDURE NUMBER 13.10.9 REVIS/ONNUMBER 9 PAGE NUMBER 13.10.9-13 of 32 WP 598 11 (9 83) t y P" 0 Ap ht14-Activation Card g5: Accountabilit Person Refer to EPIP 13.5.5"Personnel Accountability" Attachment A and implement"Activation Card 45 Accountability Duties".Attachment C Page 6 of 6 PROCEOURE NUMBER 13.10.9 REVISION NUMBER 9 PAGE NUMBER 13.10.9-14 of 32 wP 5S88I (9%I o>'E~"
OPERATIONS SUPPORT CENTER ADMINISTRATION STAFF DUTIES D-1 Significant Events Logkeeper D-2 Team Tracking Locator 0-3 Radio Communicator 0-4 Phone Communicator 0-5 Information Coordinator 0-6 Stenographer 0-7 Records Coordinator 0-8 Health Physics Logkeeper 0-9 Accountability Coordinator 0-10 Team Briefer/Debriefer D-ll Dosimetry Support 0-12 Warehouse Coordinator 0-13 Security.Operations Coordinator Attachment 0 PROCEDURE NUMBER 13.10.9 AEVISIQN NUMBER 9 PAGE NUMBER 13.10.9-15 of 32 WP 59$Rl (983) 4 0 Duties of: 0 erations Su ort Center Si nificant Events Lo kee er Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Director Activation Level: Alert Res onsibi lities 1.Maintain the Significant Events Board, similar to Attachment 8 (i.e., status board via overhead projection).
2.When full, file the log in a notebook for the briefing of incoming personnel.
Preserve the log for After Action Reports at the termination of.the emergency.
3.Assist with other administrative duties as directed by Operations Support Center Director.4.Upon shift change, fully brief your relief on responsibilities, duties, and current status.5.Upon shift change or termination of the emergency:
a.Prepare an individual After Action Report.Refer to EPIP-13.13.4,"Post Incident Reporting." b.Deliver all After Action Reports to the OSC Director.Attachment O-l PROCEDURE NUMBER 13.10.9 REVISION NUMBER 9 PAGE NUMBER 13.10.9-16 of 32 w P 5%I R l I9 83) t', lg 5 0 Duties of: 0 erations Su ort Center Team Trackin Locator Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Director Activation Level: Alert Res onsibi lities 1.Haintain the Team Location Status Board up to date.2.When Full, make a log copy of the status board similar to Attachment A.Maintain the log for future reconstruction documentation upon termination of the emergency.
3.Assist the Operations
'Support Center Director in team control and other administrative duties as directed.4.Assist the Radio Communicator and/or Phone.Communicator in maintaining contact with the teams on assignment.
5.Upon shift change, Fully brief your relief on responsibilities, duties, and current status.6.Upon shift change or termination of the emergency:
a.Prepare an individual After Action Report.Refer to EPIP 13.13.4,"Post Incident Reporting." b.Deliver all After Action Reports to the OSC Director.Attachment 0-2 PROCEDURE NUMBER 13.10.9 REVISION NUMBER 9 PAGE NUMBER 13.10.9-17 of 32 WP 59$Rl(983) 1'I i I ih Duties of: 0 erations Su ort Center Radio Communicator Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Director Activation Level: Alert, Res onsibilities 1...Set up and maintain radio communications with dispatched teams as necessary.
2.Maintain a radio traffic log so that requests for equipment or action can be relayed and tracked accurately.
3:=assi'st the, Team Tracking Locator.4..Coordinate with the ,Operations Support.,Center Director in communicating duties and directions to each team.5.Relay team messages to the Operations Support Center Director as necessary.
6.7.Assist the Operations Support Center Director with other administrative duties as directed.Upon shift change, fully brief your relief on responsibilities, duties, and current status.8.Upon shift change or termination of the emergency:
a.Prepare an individual After Action Report.Refer to EPIP 13.13.4,"Post Incident Reporting." b.Deliver all After Action Reports and Logs to the OSC Director.Attachment 0-3 ROCEDURE NUMBER 13.10.9 REVISION NUMBER 9 PAGE NUMBER 13.10.9-18 of 32 WP 598 R1(9aII Duties of: 0 erations Su ort Center Phone Communicator Assignment Location: 0 erations Su ort Center Report.to: 0 erations Su ort Center Director Activation Level: Alert Res onsibi lities l.Act as the phone communicator for the Operations Support Center Director.2~Assist the Team Tracking Locator if teams.are utilizing phones for communications.
3.Assist with other administrative duties as directed by Operations Support Center Director.4.Upon shift change, brief your relief on responsibilities, duties, and current status.5.Upon shift change or termination of the emergency:
a.Prepare an individual After Action Report.Refer to EPIP 13.13.4,"Post Incident Reporting."=
'b.Deliver all After Action Reports to the OSC Director.Attachment D-4 PRGCECURE NUMBER 13.10.9 REVIStON NUMBER 9 PAGE NUMBER 13.10.9-19 of 32 WP.SQB Rl (9 83)
A I S~" qi'(
Duties of: 0 erations Su ort Center Information Coordinator Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Director Activation Level: Alert Res onsibilities Implement duties as directed in EPIP 13.11.18"Information Network".Attachment D-5 PROCEOURE NUMBER 13.10.9 REVISiON NUMBER 9 PAGE NUMBER 13.10.9-20 of 32 WP.598 R I (9 83)
L I.ILr+I N I, 4*A%s CQNmQLLED CQPY Duties of: 0 erations Su ort Center Steno ra her Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Director Activation Level: Alert Res onsibi lities 1.Maintain a log of all major events and activities involving the OSC Director or his designee, with emphasis on: a.Receipt of notifications of changes in emergency classification.
b.The content of briefings and the identity of persons with whom he interfaces.
c.Significant telephone conversations.
d.The input and orders for decisions made.2.e.Any entry at his request.Perform other duties as, requested by the OSC Director or his designee.3.Upon shift change: a.Fully brief your relief of responsibilities, duties and current status.: b.,Forward your log to the OSC Director.4.Upon shift change or termination of the emergency:
a.Prepare an individual After Action Report.Refer to EPIP 13.13.4,"Post Incident Reporting;" b.Deliver all After Action Reports to the OSC Director.5.Upon termination of the emergency, provide the OSC Director with any required After Action Report typing and report consolidation needed.Attachment 0-6 PROCEDURE NUMBER 13.10.9 REVISION NUMBER 9 PAGE NUMBER 13.10.9-21 of 32 Wp 598 III (9'aI)
-"f%
-"f%
Outies of: Records Coordinator Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Oirector Activation Level: Alert Res onsibi lities Perform record searches, retrievals, and administrative duties as directed by the Operations Support Center Oirector.2.Verify that the most up-to-date revision of records/documents are being utilized, i.e., procedures, drawings, Forms, etc.3: 'pon shift change, fully brief your relief on responsibilities, duties, and current status.Upon shift change or termination of the emergency:
Outies of:     Records Coordinator Assignment Location:         0 erations Su   ort Center Report   to:   0 erations     Su   ort Center Oirector Activation Level:       Alert Res onsibi lities Perform record searches,             retrievals, and administrative                       duties   as directed by the Operations Support Center Oirector.
a.Prepare an individual After Action Report.Refer to EPIP 13.13.4,"Post Incident Reporting." b.Oeliver all After Action Reports to the OSC Oirector.'ttachment 0-7 PROCEDURE NUMBER 13.10.9 REVISION NUMBER 9 PAGE NUMBER 13.10.9-22 of 32 WP 598 Al (9 83)
: 2. Verify that the         most up-to-date     revision of records/documents                   are being utilized, i.e., procedures, drawings, Forms, etc.
C 4l'C'0 Duties of: Health Ph sics Lo kee er Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Lead Health Ph sicist Activation Level: Alert.Res onsibi lities 2.3.Oocument all reported health physics data.Keep the Lead'ealth Physics Person informed.Update the survey maps with the most current data.Update the Hazardous Area(s)Status Board.4.Assist the Lead Health Physics person as directed.5, Oistribute emergency dosimetry and keep a log of exposure history 6.Read and log in pencil dosimeters and estimated dose from returning teams.7.Upon shift change, fully brief your relief of'esponsibilites, duties and current status.8.Upon shift change or termination of the emergency:
3:   'pon shift change, fully brief your relief on responsibilities, duties, and current status.
a.Prepare an individual After Action Report.Refer to EPIP 13.13.4,"Post Incident Reporting." b.Deliver all After Action, Reports to the.Lead Health Physcis Person Attachment 0-8 PROCEDURE NUMBER , 13.10.9 REVISlGN NUMBER 9 PAGE NUMBER 13.10.9-23 of 32 WP.598 Rl (9 83) a CQNTRQLLEQ CQPY Duties of: 0 erations Su ort Accountabilit Coordinator Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Director Activation Level: Alert ,Res onsibi lities 1.Refer to EPIP 13.5.5"Personnel Accountability Duties"'nd implement the applicable section.2.Assist the Operations Support Center Director in, other administrative duties as directed.3.'aintain a log similar to Attachment E,"Service Building Checkout Log" of all personnel who leave the OSC.4.Upon shift change or termination of the emergency:
Upon   shift change     or termination of the emergency:
a.Prepare an individual After Action Report.Refer to EPIP 13.13.4,"Post incident Reporting." b.Deliver all After Action Reports to the OSC Director.Attachment 0-9 PROCEDURE NUMBER 13.10.9 REVISION NUMBER 9 PAGE NUMBER 13.10.9-24 of 32 VIP.598 R I (0 83)  
: a. Prepare   an   individual After Action Report.                         Refer to EPIP 13.13.4, "Post Incident Reporting."
: b. Oeliver all After Action Reports to the       OSC Oirector.'ttachment 0-7 PROCEDURE NUMBER                    REVISION NUMBER      PAGE NUMBER 13.10.9                         9                                                   13.10.9-22 of 32 WP 598 Al (9 83)
 
C 4l
    'C' 0
 
Duties of:     Health   Ph   sics   Lo kee er Assignment Location:           0 erations   Su   ort Center Report   to:   0 erations     Su   ort Center     Lead Health Ph sicist Activation Level:         Alert
              .Res   onsibi lities Oocument   all reported health physics data.               Keep the Lead'ealth   Physics Person   informed.
: 2. Update the survey maps           with the most current data.
: 3. Update the Hazardous         Area(s) Status Board.
: 4. Assist the   Lead   Health Physics person as directed.
5,     Oistribute   emergency dosimetry and keep a log of exposure               history
: 6. Read and log in pencil dosimeters and estimated dose from returning teams.
: 7. Upon shift   change,       fully brief     your   relief of'esponsibilites, duties     and current status.
: 8.     Upon shift   change     or termination of the emergency:
: a. Prepare   an   individual After Action Report.             Refer to EPIP 13.13.4, "Post Incident Reporting."
: b. Deliver all After Action, Reports to the             .Lead Health Physcis Person Attachment 0-8 PROCEDURE NUMBER                     REVISlGN NUMBER        PAGE NUMBER
                  , 13.10.9                         9                                       13.10.9-23 of 32 WP.598 Rl (9 83)
 
a CQNTRQLLEQ CQPY Duties of:     0 erations     Su   ort Accountabilit Coordinator Assignment Location:         0 erations Su   ort Center Report   to:   0 erations     Su   ort Center Director Activation Level:       Alert
                ,Res   onsibi lities
: 1. Refer to EPIP 13.5.5 "Personnel Accountability Duties"'nd implement the applicable section.
: 2. Assist   the Operations       Support   Center Director in, other administrative duties   as directed.
: 3.   'aintain     a log similar to Attachment E,"Service Building Checkout Log" of all personnel who leave the OSC.
: 4. Upon   shift change     or termination of the emergency:
: a. Prepare   an   individual After Action Report.       Refer to EPIP 13.13.4, "Post incident Reporting."
: b. Deliver all After Action Reports to the       OSC Director.
Attachment 0-9 PROCEDURE NUMBER                      REVISION NUMBER      PAGE NUMBER 13.10.9                         9                                 13.10.9-24 of 32 VIP.598 R I (0 83)
 
Duties of:      0 erations      Su    ort Center Briefer/Debriefer Assignment Location:          0  erations  Su  ort Center Report  to:    0 erations      Su  ort  Center Director Activation Level:        Alert
              .Res  onsibi lities
: 1. Complete,    process and maintain          a  team  briefing/debriefing form for    each reentry/recovery team dispatched              from, and returning to the      OSC pursuant to EPIP 13.10.12/13.10.13.
: 2. Assist the OSC Director in the briefing/debriefing                oF  the teams and with other administrative duties as directed.
: 3. Assist the Team Tracking Locator and Accountability Coordinator in the tracking of teams/personnel as required.
: 4. Upon shift change,          fully brief    your    relief  on responsibilities, duties, and current status.
: 5. Upon    shift  change    or termination of the emergency:
: a.      Prepare  an    individual After Action Report.            Refer to EPIP 13.13.4, "Post Incident Reporting."
: b.      Deliver all After Action Reports to the            OSC Director.
Attachment D-10 PROCEDURE NUMBER                    REVISION NUMBER        PAGE NUMBER 13.10.9                          9                                    13.10.9-25 of  32 WP 598 Rl i9.N)
 
  ~C t,)
        ~
1f "I 1'i e i ~
I
)1    Y
 
Duties of:      Dosimetr      Su    ort Assignment Location:            0  erations    Su    ort Center Report    to:    Lea'd  Health    Ph  sicist Activation Level:          Alert Res  onsibilities
: l. Distribute      emergency dosimetry and keep log of exposure            history.
2.. Read  and  log in pencil dosimeters and estimated dose from returning teams.
: 3. Verify exposure,          medical    and    training data    by way  of the  RER system as needed.
: 4. Update exposure data on the            RER  system as  directed.
: 5. Perform    habitability        check of OSC every 15 minutes by observing the CAN and ARN    performing radiation surveys            if  needed, and by spot checking For contamination.
: 6. Remind    personnel      in the    OSC    to read  their dosimetry periodically    as established by        Lead HP.
: 7. Upon  shift    change    or termination of the emergency:
: a. Prepare an individual After Action Report.                  Refer to EPlP 13.13.4, "Post incident Reporting".
b.'eliver        all After'ction        Reports  to'the  OSC Director.
Attachment D-ll PROCEDURE NUMBER                      REVIStON NUMBER        PAGE NUMBER 13.10.9                          9                                    13.10.9-26 of  32 WP 59$ Rl (9 83)
 
JVf Outies    of:  Warehouse      Coordinator Assignment Location:          0  erations  Su  ort Center Report    to:  0  erations      Su  ort Center Oirector Activation Level:        Alert Res  onsibilities
: 1. Provide the      OSC  Oirector with assistance in locating and obtaining ware-house  materials    and    parts needed by Plant emergency personnel.
: 2. Notify Warehouse Management/Supervisor that an emergency condition exists, and  request additional manpower resources that may be needed to support emergency operations.
: 3. Upon shift      change, fully brief your relief        on  responsibilities, duties and current    status of emergency operations.
: 4. Upon  shift  change      or termination of the emergency:
: a.      Prepare    an  individual After Action Report.      Refer to EPIP 13.13.4, "Post Incident Reporting".
: b. Oeliver all After Action Reports to the        OSC  Oirector.
Attachment 0-12 PROCEDURE NUMBER                      REVISION NUMBER      PAGE NUMBER 13.10.9                          9                                13.10.9-27 of 32 WP 59B Rl I9.aI)
 
yF V
,pl l~
W
 
CQNmQLLED t.QPY Duties of:      Securit    0  erations Coordinator Assignment Location:          0  erations  Su    ort Center Report  to:    0  erations    Su  ort  Center Director Activation Level:        Alert Res  onsibi  lities
: l. Provide the OSC Director, Security Manager, and TSC Administrative Manager with periodic briefings on specific security contingency events that may influence the movement of Plant emergency personnel within Protected or Owner Controlled Areas of the Plant during emergency events.
: 2. Maintain contact. with the Security Shift Supervisor in order to keep the OSC Director informed of Security Force personnel's              locations and actions.
: 3. Assist the OSC Accountability Coordinator in tracking Security personnel as required.
: 4. When    required, ensure the Primary Access Point ( PAP) and Alternate Access Point '(AAP) are directing personnel to process through the OSC beFore entering or exiting the Plant Protected Area.
: 5. Obtain information From the OSC Lead HP in order to coordinate instruc-tions with the Security Shift Supervisor on the nature and location of Plant radiological hazards; and where necessary, coordinate protective clothing needs and HP support for Security personnel that must operate in radiologically      hazardous    areas.
: 6. Upon shift      change, fully brief your relief            on  responsibil'ities,  duties and current    status of emergency operations.
: 7. Upon  shift    change    or termination of the emergency:
: a. Prepare an individual After Action Report.                Refer to EPIP 13.13.4, "Post Incident Reporting".
: b. Deliver all After Action Reports            and Logs  to the  OSC  Director.
Attachment D-13 PROCEDURE NUMBER                    REVISION NUMBER        PAGE NUMBER 13.10.9                        9                                      13.10.9-28  oF 32 WP 59IIRI I983I
 
tf ~ I il SERVICE BUILOING CHECKOUT LOG MANE                            OEST I MAT ION      OUT        IN of OSC  to  OSC Attachment    E PROCEDURE NUMBER            REVISION NUMBER    PAGE NUMBER 13.10.9                    9                          13.10.9-29 oF 32 WP 598 RI (9 N)


Duties of: 0 erations Su ort Center Briefer/Debriefer Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Director Activation Level: Alert.Res onsibi lities 1.Complete, process and maintain a team briefing/debriefing form for each reentry/recovery team dispatched from, and returning to the OSC pursuant to EPIP 13.10.12/13.10.13.
h f VfVVAV g+V fVVV, V 4 If
2.Assist the OSC Director in the briefing/debriefing oF the teams and with other administrative duties as directed.3.Assist the Team Tracking Locator and Accountability Coordinator in the tracking of teams/personnel as required.4.Upon shift change, fully brief your relief on responsibilities, duties, and current status.5.Upon shift change or termination of the emergency:
a.Prepare an individual After Action Report.Refer to EPIP 13.13.4,"Post Incident Reporting." b.Deliver all After Action Reports to the OSC Director.Attachment D-10 PROCEDURE NUMBER 13.10.9 REVISION NUMBER 9 PAGE NUMBER 13.10.9-25 of 32 WP 598 Rl i9.N)
~C t,)~"I 1'i e i~1f I)1 Y Duties of: Dosimetr Su ort Assignment Location: 0 erations Su ort Center Report to: Lea'd Health Ph sicist Activation Level: Alert Res onsibilities l.Distribute emergency dosimetry and keep log of exposure history.2..Read and log in pencil dosimeters and estimated dose from returning teams.3.Verify exposure, medical and training data by way of the RER system as needed.4.Update exposure data on the RER system as directed.5.Perform habitability check of OSC every 15 minutes by observing the CAN and ARN performing radiation surveys if needed, and by spot checking For contamination.
6.Remind personnel in the OSC to read their dosimetry periodically as established by Lead HP.7.Upon shift change or termination of the emergency:
a.Prepare an individual After Action Report.Refer to EPlP 13.13.4,"Post incident Reporting".
b.'eliver all After'ction Reports to'the OSC Director.Attachment D-ll PROCEDURE NUMBER 13.10.9 REVIStON NUMBER 9 PAGE NUMBER 13.10.9-26 of 32 WP 59$Rl (9 83)
JVf Outies of: Warehouse Coordinator Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Oirector Activation Level: Alert Res onsibilities 1.Provide the OSC Oirector with assistance in locating and obtaining ware-house materials and parts needed by Plant emergency personnel.
2.Notify Warehouse Management/Supervisor that an emergency condition exists, and request additional manpower resources that may be needed to support emergency operations.
3.Upon shift change, fully brief your relief on responsibilities, duties and current status of emergency operations.
4.Upon shift change or termination of the emergency:
a.Prepare an individual After Action Report.Refer to EPIP 13.13.4,"Post Incident Reporting".
b.Oeliver all After Action Reports to the OSC Oirector.Attachment 0-12 PROCEDURE NUMBER 13.10.9 REVISION NUMBER 9 PAGE NUMBER 13.10.9-27 of 32 WP 59B Rl I9.aI) yF V ,pl l~W CQNmQLLED t.QPY Duties of: Securit 0 erations Coordinator Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Director Activation Level: Alert Res onsibi lities l.Provide the OSC Director, Security Manager, and TSC Administrative Manager with periodic briefings on specific security contingency events that may influence the movement of Plant emergency personnel within Protected or Owner Controlled Areas of the Plant during emergency events.2.Maintain contact.with the Security Shift Supervisor in order to keep the OSC Director informed of Security Force personnel's locations and actions.3.Assist the OSC Accountability Coordinator in tracking Security personnel as required.4.When required, ensure the Primary.Access Point (PAP)and Alternate Access Point'(AAP)are directing personnel to process through the OSC beFore entering or exiting the Plant Protected Area.5.Obtain information From the OSC Lead HP in order to coordinate instruc-tions with the Security Shift Supervisor on the nature and location of Plant radiological hazards;and where necessary, coordinate protective clothing needs and HP support for Security personnel that must operate in radiologically hazardous areas.6.Upon shift change, fully brief your relief on responsibil'ities, duties and current status of emergency operations.
7.Upon shift change or termination of the emergency:
a.Prepare an individual After Action Report.Refer to EPIP 13.13.4,"Post Incident Reporting".
b.Deliver all After Action Reports and Logs to the OSC Director.Attachment D-13 PROCEDURE NUMBER 13.10.9 REVISION NUMBER 9 PAGE NUMBER 13.10.9-28 oF 32 WP 59IIRI I983I tf~I il SERVICE BUILOING CHECKOUT LOG MANE OEST I MAT ION OUT of OSC IN to OSC Attachment E PROCEDURE NUMBER 13.10.9 WP 598 RI (9 N)REVISION NUMBER 9 PAGE NUMBER 13.10.9-29 oF 32 h f VfVVAV g+fVVV, V V 4 If CQNTRQLLED CQPY Operations Support Center Floor plan (Similar to)Range M Cl Cl tL, C(4 a CS o Cl ccl cd Flies Cl o~Cl CS c 0 a CS C Vl 0 4 0t CI C1 CI 01-CD o 0 0 0 a~c 0 0 CD 0 0 o I O Cl a C.o 5 C~0 Vl C 0 o 0 0('0 (d a Cl Cl I 0 a.C 0 C C CJ~O a Oa Vl~OQ.~~~~~4(S dl'(S'1 o 41 0 4'0 Cl 41 CS (d 4 c1 (d Q OI aM 0l 41 C1 a a WQ oC C C 0 0 a 01 0 cl c<<Vl Q 0 a 01~o c a CSS a 0 OO 6 04a C 0 o CC aso~-CCC cd 01 o~p<<I 41 C 0 co%0 0 cs~asal C C~~<=22 CJ 41 a C~(CL l 0 0 c c a (cs cl a Cl CS Cl 0 LLS 44S:l l Id Cl C cd 0 o C C o~C 41 4 0 LLL C CI C Cl CQ PC Cl Co LLS I 41 C a O C Co O o LLS Cl vl as O o Vl E 0 LLS~~CS<<dl dl~Cl C C 0 01 Cl 01 g4 c O l g.~0 O 0 C Vl Cl 01 Cla CS a C a C L LLS C C 41 Q.Q.W WT+T+cd 0 01 Vl C Cl Q Cll CI 0 CQ QS 01 C cd 0 Ci 0l CI7 cd cd CS~O 0 Q3 Ql C Cl CS CS<<(CS 0 41 o QS c C 0 Cl a Vl Q OO Cll Vl 00 Cl 0 C 4l LLS CS O c 0 Vl Cl 0l T OOSS Cl'0 Cl C(S'0 Cl Vl 0 O 0 QS CS 41 01 0 Cl M 4 CS<<4 Ccl m~ICS Cd<<CV QS CLS CL QS CQ 4 4 Attachment F Ill$'I((c(I P ROCECURE NUMSER 13.10.9 REVISLCN NUMBER 9 PAGE NUMSER 13.10.9-30 of 32 WP 5((8 LL1 (9 81) 4 4't h Ie OSC DIRECTOR CHECKLIST OSC Director Date~Action l.Upon arrival, assess the state of readiness for OSC personnel and resources to perform defined tasks.Time Initiated Tl llle~tom 1eted 2.Obtain briefing from Shift Manager on Plant conditions, hazards, and status of Plant Emer-'ency Teams (PETs).3.Establish with SM/PED what teams will be under OSC or Control Room control.N/A N/A 4.'OSC"'d'eclared""ACTIVATED" at hrs.By a)PA announcement that OSC is activated and any special instructions.
N/A b)Announcement that OSC is activated to OSC staff, and other Plant emergency centers.N/A 5.Ensure OSC habitability monitoring has commenced.
N/A 6.Direct Plant,accountability commence per EPIP 13.5.5.7.If>OSC uninhabitable:
a.Relocate select personnel to alternate OSC.b.Notify PED and other Plant emergency'centers of OSC relocation.
N/A c.If required evacuate OSC non-selected personnel per EPIP 13.5.1.N/A 8.If additional OSC manpower is needed, notify the Plant Administrative Manager at the TSC.N/A Attachment G Page 1 of 2 PROCEDURE NUMBER 13.10.9 WP.SQI R 1 (9 83)REVISION NUMBER PAGE NUMBER 13.10.9-31 oF 32 est tl ih CQlMTIRQLLEG CD'SC DIRECTOR CHECKLIST (,Continued)
Action 9.IF required, transport injured or contaminated personnel ofFsite per EPIP 13.7.8.Time completed Initials 10.Chemistry Lab activated with Health Physics coverage as required.llew PASS samples obtained with HPs and PASS qualified Chemistry Technicians.
12.'If PED directs restriction of Protected Area entry or exit, coordinate PAP/AAP actions with OSC Security Coordinator.
13.Coordinate Plant's material needs with OSC Warehouse Coordinator.
N/A 14.Conduct Reentry Team actions per EPIP 13.10.12.15.Conduct Recovery Team actions per EPIP 13.10.13.16.Upon shift change, turn over OSC Director Log and fully b ri e f your re 1 i e f.17.Upon termination of emergency, prepare AFter Action Report, then collect all stafF After Action Reports and Logs, and deliver to Plant Emergency Director.N/A N/A Attachment G Page 2 of 2 PROCEOURE NUMBER 13.10.9 WP 59B R l (9 aI)REVISION NUMBER PAGE NUMBER 13.10.9-32 of 32


wAAHsnoson nv~Llc tosssn 4P SUPPLY SYSTEM PLANT PROCEDURES MANUAL WNP-2 PROCEDURE NUMBER 13.11.13 APPROVED/yg/g 4l~tr dCuI,I~DATE 08 08 89 VOLUME NAME 13 SECTION EMERGENCY PLAN IMPLEMENTING PROCEDURES 13.11 EMERGENCY OPERATIONS FACILITY TITLE 13.11.13 EOF NEWS WRITING TEAM DUTIES 13.11.13.1
CQNTRQLLED CQPY Operations Support Center Floor plan (Similar to)
~nor osn This procedure describes the activation and operation of the Emergency Operations Facility (EOF)News Writing Team.The purpose of this team is to prepare written Supply System news releases and technical bulletins and ensure timely transmission of these items to the Joint Information Center (JIC)Assistant JIC Director for dissemination to the JIC Director, Spokesperson, and Technical Spokesperson.
CS oCl ccl cd Range                                    C(4 M
This team also develops and transmits emergency information to INPO via Nuclear Network.The team reports to the Recovery Manager, The team consists of the EO Public Information Officer and the Network Coordinator and technical liaisons.13.11.13.2 References EPIP 13.13.4, Post Incident Reporting INPO 84-014 Rev.4, Nuclear Network User's Manual INPO.87-014 Rev.1, NPRDS Access Guide 13.11.13.3 Procedure Action EOF News Writing Team Member l.Upon notification of an Alert, Site Area or General Emergency, proceed to the Emergency Operations Facility (EOF).Show emergency ID to Hanford Security at checkpoint(s).
Cl a
2.Upon arrival at the EOF, enter through Ambulance Bay door if area is activated.
Cl tL, Flies Cl
If the ambulance bay is not activated enter via normal entry points'.PROCEDURE NUMBER 13.11.13 WP 697 R3 (2/66)REVISION NUMBER PAGE NUMBER 13.11.13-1 of 4
                                                      ~o    Cl CS oC C
C 0
c 0          0      a                                              cd 01            o                                        0 0 <<Vl c
a CS          cl C Vl      Q 0 a                                                  01 o        0          o a ~a 0 01    41 Id 0        4 0t      0 c    CSS OO 4 Cl Vl 0(
                                            '0        CI C1 CI
                                                                                '0              C                        C C (d        01 CD        6  04a        Cl 0 o cd          Cl C
Cl Cl a                    0 C 41 o  41 C                  C          Q CS                Cl 0
CC aso~
CS Cl        o 0                                                    0
                                                                  -CCC    o      (d        a                  01                          0 C
4l Cl 0 0 cd    01 4          O      C 01 g4 Cl    Cll CI 0  CS QS LLS I
0        a 0~ ~p          <<I                C C o
CQ  QS              CS CS
: a. c 0 41    C 0      c1 Co        ~
C 41 O l g.
c          01  <<(  CS 0
41 O
CD    co%0          (d                4O~        0      C  cd 0
C        0          0                    O                  0                41 o
01 c
0    o    cs ~asal                    0          C  Vl                          0 Cl O I                       C C Q                            Cl                QS  cC 0 C                a ~~< =    22          OI o LLS LLL C 01 Cla            0            Cl    Vl Cl T
                                                      '(S'1 C                                                              CS 0              0l CJ      C.o 5        CJ 41 a          aM                CI      a Ca          Ci        Cl    M  OOSSCl '0
                                          ~O                      C CL l ~ (                  C          C                a                    Cl C(S '0 41 0l    Cl Cl CQ a                                    C1 vl as              LLS Vl Q 0                            PC  L 0l OO 4 Cl Oa C ~0 a Cl 0cs cclCl ac0 a a OVl oE ClCo C 41C Vl ~
(
CI7  cd cd Cll Vl      CS OQ. Vl C 0 LLS 44S:l l WQ 0 LLS LLS I Q.Q. W CS
                                                                                                                      ~
CS O  00 <<4 Vl 0 O
                                                                                                  << WT+ T+          0      Ccl m    ~  ICS Cd  <<CV
                                        ~
                                          ~    ~
4(S dl
                                                    ~    ~                              ~
dl dl
                                                                                              ~ CS
                                                                                                ~                    Q3 Ql QS    CLS  CL QS CQ    44 Attachment        F Ill 'I(( c(I P ROCECURE        NUMSER                        REVISLCN NUMBER                       PAGE NUMSER 13.10.9                                            9                                                                    13.10.9-30 of 32 WP 5((8 LL1 (9 81)


Res onsibilit Action EOF News Writing Team Member 3.Sign in on staffing board in the Supply Sys-tem Decision Center and on the log-in sheet in the Media Briefing Preparation Area (HBPA).Pick up materials from the Offsite Agency Coordination Center (OACC)emergency cabinet.EOF Public Information Officer 5.Upon arrival at the EOF notify the Administrative Support of availability.
4 4
Establish contact with the JIC Director and the JIC Director's Secretary.
't h Ie
6.7.Coordinate and direct activities of the EOF News Writing Team as needed.Advise the Recovery Manager on matters pertinent to public information and JIC status and operations.
8.Obtain approval from the Recovery Manager for media tours and briefings at the EOF.Ensure detailed coordination with the JIC Director/Hedia Manager.EOF Public Information Officer/Technical Liaisons 9.Ascertain the status of the event.Prepare news releases, technical bulletins and Nuc-lear Network Bulletins as appropriate.
Obtain technical approval from the Assistant Recovery Manager before transmitting to the JIC.Remember that Counties report protec-tive actions.10.Establish computer link with JIC to trans-mit releases/bulletins to the Assistant JIC Director thru the JIC Editor.Remind JIC staff that if the technical content of a news release is changed, JIC must obtain approval from the Assistant Recovery Manager.Transmit Emergency Information Bulletins to INPO via Nuclear Network.Report emergency classification changes (upgrade, downgrade or termination) and major events occurring during the emergency.
See Attachment A, for Nuclear Network Information Bulletin format.t PROCEOURE NUMBER 13.11.13 WP.SSS R1 (943)REVISION NUMBER PAGE NUMBER 7 13.11.13-2 of 4


Res onsibilit Action Network Coordinator (Cont.)12.'As directed, access the Nuclear Plant Reliability Data System (NPRDS)to obtain information on the nationwide location of spare parts or sources for system information.
OSC  DIRECTOR CHECKLIST OSC  Director                                                                Date ~
13.Utilize communication equipment located in the PSF to access Nuclear Network and other information data bases.If necessary relocate portable equipment to the HBPA.EOF News Writing Team Hembers 14.Maintain a chronology of significant inputs, actions, events and their resolutions on an already established log, or on a log similar to the"Emergency Response Log", for attachment to your After Action Report.See EPIP 13.13.4,"Post Incident Reporting", 15.Refer any, calls from the news media to the Joint Information Center.16.Upon shift change, fully brief your relief as to events which have transpired.
Time            Tl llle Action                                                    Initiated      ~tom  1eted
17.Upon shift change or termination of the JjC function: 13.11.13.4 Attachments a, Prepare an individual After Action Report (Refer to EPIP 13.13.4,"Post Incident Reporting").b.Deliver the original After Action.Report to the JIC Director and provide a duplicate After Action Report to the Assistant Recovery Manager.>A.Format For Nuclear Network Information Bulletin PROCEDURE NUMBER 13.11.13 WP.598 R1 ($43)REVISION NUMBER 7 PAGE NUMBER 13.11.13-3 of 4 CONTIROLLED COP V FORMAT FOR NUCLEAR NETWORK INFORMATION BULLETIN NT Topic (Specified by INPO)(If THIS IS A GRILL-SO NOTE AT BEGINNING AND END OF THE TRANSMISSION)
: l. Upon  arrival,    assess    the state of readiness for  OSC  personnel      and  resources to perform defined tasks.
: 2. Obtain    briefing      from  Shift  Manager on Plant conditions, hazards,          and  status of Plant      Emer-'ency Teams  (PETs).
: 3. Establish with      SM/PED what teams        will be    under OSC  or Control    Room control.                                        N/A              N/A 4.'OSC"'d'eclared"      "ACTIVATED" at                    hrs.            By a)    PA  announcement        that  OSC  is activated and any    special instructions.                                    N/A b)    Announcement      that OSC is activated to OSC  staff,    and  other Plant emergency centers.                                                            N/A
: 5. Ensure    OSC  habitability monitoring          has commenced.                                                                N/A
: 6. Direct Plant,accountability            commence    per EPIP  13.5.5.
: 7. If>OSC    uninhabitable:
: a.      Relocate select personnel            to alternate OSC.
: b. Notify    PED  and    other Plant emergency
                          'centers of      OSC    relocation.                                  N/A
: c. If required      evacuate OSC non-selected personnel    per EPIP 13.5.1.                                      N/A
: 8. If additional      OSC    manpower    is needed, notify the Plant Administrative Manager at the                  TSC.              N/A Attachment    G Page  1 of  2 PROCEDURE NUMBER                      REVISION NUMBER        PAGE NUMBER 13.10.9                                                                      13.10.9-31 oF 32 WP.SQI R 1 (9 83)
 
est tl ih
 
CQlMTIRQLLEG CD'SC DIRECTOR CHECKLIST              (,Continued)
Time Action                                                    completed      Initials
: 9.      IF required, transport injured or contaminated llew personnel ofFsite per EPIP 13.7.8.
: 10. Chemistry Lab activated with Health Physics coverage as required.
PASS  samples  obtained with      HPs and    PASS qualified Chemistry Technicians.
: 12.    'If PED  directs restriction of Protected Area entry or exit, coordinate PAP/AAP actions with OSC Security Coordinator.
: 13. Coordinate Plant's material needs with                  OSC Warehouse  Coordinator.                                                  N/A
: 14.      Conduct Reentry Team actions per EPIP 13.10.12.
: 15. Conduct Recovery Team actions per EPIP 13.10.13.
: 16. Upon  shift change, turn      over  OSC  Director        Log and  fully b ri e f your re  1 ie f.                                    N/A
: 17. Upon termination of emergency, prepare AFter Action Report, then collect all stafF After Action Reports and Logs, and deliver to Plant Emergency  Director.                                                    N/A Attachment          G Page  2 of  2 PROCEOURE NUMBER                    REVISION NUMBER        PAGE NUMBER 13.10.9                                                                      13.10.9-32 of 32 WP 59B R l (9 aI)
 
wAAHsnoson nv ~ Llc tosssn 4P  SUPPLY SYSTEM PLANT PROCEDURES MANUAL WNP-2 PROCEDURE NUMBER              APPROVED    /  yg                          DATE 13.11.13                            4l~tr/gdCuI,I~                        08 08 89 VOLUME NAME 13          EMERGENCY PLAN IMPLEMENTING PROCEDURES SECTION 13.11        EMERGENCY OPERATIONS      FACILITY TITLE 13.11.13    EOF NEWS WRITING TEAM DUTIES 13.11.13.1      ~nor osn This procedure describes the activation and operation of the Emergency Operations Facility (EOF) News Writing Team. The purpose of this team is to prepare written Supply System news releases and technical bulletins and ensure timely transmission of these items to the Joint Information Center (JIC) Assistant JIC Director for dissemination to the JIC Director, Spokesperson,      and Technical Spokesperson.                  This team also develops and transmits emergency information to INPO via Nuclear Network. The team reports to the Recovery Manager,                The team consists of the EO Public Information Officer and the Network Coordinator and technical liaisons.
13.11.13.2      References EPIP  13.13.4, Post Incident Reporting INPO  84-014 Rev. 4, Nuclear Network User's Manual INPO  .87-014 Rev. 1,    NPRDS  Access Guide 13.11.13.3      Procedure Action EOF News    Writing    Team            l. Upon  notification of            an Alert, Site Area or Member                                        General    Emergency,          proceed to the Emergency Operations Facility (EOF). Show emergency ID to Hanford Security at checkpoint(s).
: 2. Upon    arrival at the              EOF,  enter through Ambulance Bay door                if  area  is activated.
If the ambulance bay is not                activated enter via normal entry points'.
PROCEDURE NUMBER                  REVISION NUMBER      PAGE NUMBER 13.11.13                                                                      13.11.13-1 of  4 WP 697 R3 (2/66)
 
Res onsibilit                                      Action EOF News  Writing Team          3. Sign in on    staffing    board in the Supply Sys-Member                                tem Decision Center and on the log-in sheet in the Media Briefing Preparation Area (HBPA). Pick up materials from the Offsite Agency Coordination Center (OACC) emergency cabinet.
EOF  Public Information              Upon arrival at the EOF notify the Officer                                Administrative Support of availability.
: 5. Establish contact with the JIC Director and the JIC Director's Secretary.
: 6. Coordinate and direct        activities of the  EOF News  Writing    Team as needed.
: 7. Advise    the    Recovery    Manager  on  matters pertinent    to public      information  and  JIC status  and  operations.
: 8. Obtain approval      from the Recovery Manager for  media tours and briefings at the EOF.
Ensure detailed coordination with the JIC Director/Hedia Manager.
EOF Public Information            9. Ascertain the status of the event. Prepare Officer/Technical                      news releases, technical bulletins and Nuc-Liaisons                              lear    Network Bulletins as          appropriate.
Obtain technical approval from the Assistant Recovery Manager before transmitting to the JIC. Remember that Counties report protec-tive actions.
: 10. Establish computer link with JIC to trans-mit releases/bulletins to the Assistant JIC Director thru the JIC Editor. Remind JIC staff that if the technical content of a news release      is changed, JIC must obtain approval      from    the    Assistant    Recovery Manager.
Transmit Emergency Information Bulletins to INPO via Nuclear Network.        Report emergency classification changes (upgrade, downgrade or termination) and major events occurring during the emergency.          See Attachment A, for Nuclear Network Information Bulletin format.
t  PROCEOURE NUMBER WP.SSS R1 (943) 13.11.13 REVISION NUMBER 7
PAGE NUMBER 13.11.13-2 of  4
 
Res onsibilit                                         Action Network Coordinator (Cont.)         12. 'As     directed,     access   the Nuclear       Plant Reliability       Data System (NPRDS) to         obtain information on the nationwide             location of spare parts or sources for system information.
: 13. Utilize     communication equipment located in the   PSF to access Nuclear Network and other information data bases. If necessary relocate portable equipment to the HBPA.
EOF News   Writing Team           14. Maintain     a chronology of significant inputs, Hembers                                  actions, events and their resolutions on an already established           log, or on a log similar to the "Emergency Response Log",
for attachment to your After Action Report.       See EPIP 13.13.4,       "Post Incident Reporting",
: 15. Refer any, calls from the         news media to the Joint Information Center.
: 16. Upon shift change,         fully brief   your   relief as to events which have       transpired.
: 17. Upon   shift   change   or termination of the JjC function:
a,     Prepare   an   individual After Action Report (Refer to EPIP 13.13.4, "Post Incident Reporting" ).
: b.     Deliver     the   original     After Action
                                                          . Report to the JIC Director and provide a duplicate After Action Report to the Assistant Recovery Manager.
13.11.13.4    Attachments
                > A. Format For Nuclear Network Information         Bulletin PROCEDURE NUMBER                    REVISION NUMBER    PAGE NUMBER 13.11.13                       7                                   13.11.13-3 of   4 WP.598 R1 ($ 43)
 
CONTIROLLED COP V FORMAT FOR NUCLEAR NETWORK INFORMATION BULLETIN NT Topic (Specified by INPO)
( If THIS IS A GRILL SO NOTE AT BEGINNING AND END OF THE TRANSMISSION)
GENERAL INFORMATION
GENERAL INFORMATION
'tility.'lant.Location.Oate.Classification
                  'tility.
.Time.Release No.
                  'lant.
                                                . Washington WNP-2' Public Power Supply System Location   .                 Richland, Washington Oate .
Classification   .
Time .
Release   No.


==SUBJECT:==
==SUBJECT:==
.Washington Public Power Supply System WNP-2'Richland, Washington MESSAGE: INFORMATION CONTACT NAME PHONE Approved by: Oate Time Attachment A PROCEDURENUMBER 13.11.'13 WP.598 Rl (9.83)REVISION NUMBER PAGE NUMBER 13.11.13-4 of 4 masssswmsms
~I el Is emllae 43 SUPPLY SYSTEM PLANT PROCEDURES MANUAL WNP-2 PROCEDURE NUMBER 13.14.1 g'pfj/ecu';ra DATE 06/25/90 VOLUME NAME 13 EMERGENCY PLAN INPLENENTING PROCEDURES SECTION 13.14 SUPPORTING INFORMATION PROCEDURES TITI.E 13.14.1 EMERGENCY EXPOSURE LEVELS/PROTECTIVE ACTION GUIDES 13.14.1.1~Pur ose This procedure outlines the authority and process to exceed administra-tive exposure guides, and to implement 10CFR20 limits and implement emer-gency worker Protective Action Guides (PAGs).Additionally, it provides Supply System, State, and Federal PAGs as references.
PAGs are numerical projected or monitored doses or dose rates that act as trigger points to initiate Protective Action Decisions (PAOs)for Supply System emergency workers and field team members and/or trigger Protective Action Recommen-dations (PARs)for other emergency workers and/or the general public outside of the Supply System's area of authority.
This procedure is divided into two parts: Part A deals with Emergency Exposure levels and Part B deals with PAGs.13.14.1.2 References A.10CFR20.101
-Radiation Dose Standards for Individuals in Restricted Areas B.C.Mashington State Oepartment of Health (OOH), Res ense Procedures for Radiation Emer encies, Appendix A,"Protective Action Guides" PPM 11.2.5.1-Personnel Exposure Limits and Guides EPIP 13.14.2-Process for Determining Protective Action Recommendations and Protective Action Decisions PROCEDURE NUMBER 13.14.1 REVISION NUMBER 7 PAGE NUMBER 13.14.1-1 of 15 WP.597 R3 I2/86) 4~
n 13.14.1.3 Procedure A.Emer enc Ex osure Levels Res onsibi lit Action Radiation Protection Manager (for emergency workers'within the Protected Area)and Radiological Emergency Manager (for Supply System emergency workers and field team members at any location outside of the Protected Area)l.Apply the principles of ALARA.2.If practical, do not authorize'expo-sures exceeding Supply System Adminis-trative Exposure Guides (Attachment A).3.When necessary, authorize exposure(s) in excess of Supply System Admini-strative Exposure Guides (but not to exceed 10CFR20 Limits, Attachment 8).4.Prior to authorizing increased expo-sures, if practical review individual exposure histories on the Radiation Exposure Records (RER)System.5.Caution personnel to maximize efforts to remain below 10CFR20 Limits.6.Oocument authorization and include in After Action Report.7.As needed,'obtain permission from the Plant Emergency Oirector or Recovery Manager (as applicable) to implement emergency exposure guides above 10CFR20 limits.8.When implementing the emergency expo-sure guides for emergency workers, ensure that: a.Persons involved are volunteers who are broadly familiar with the consequences of such exposures.
b.First consideration is given to volunters above the age of 45.C.Women of child bearing age are not normally included.wP.598 At I9 83)13.14.1 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.1-2 of 15 Res onsibi lit Action Plant Emergency Director (for emergency workers within the Protected Area)and Recovery Manager (for Supply System emergency workers and field team members at any location outside of the Protected Area)10.Nhen authorizing exposures in excess of 10CFR20 Limits, refer to Attachment C"Protective Action Guide For Plume Exposure Pathway" and Attachment 0,"Additional Emergency Morker Protective Action Guidance".
9.Evaluate alternatives prior to granting authorization to exceed Attachment 8,"10CFR20 Limits".12.Author i ze uti 1 i za t i on of app 1 i cabl e emergency guides in Attachments C and 0, when necessary, and after consultation with the Radiation Protection Manager, or with the Radiological Emergency Manager For respective areas, Document authori za t i on for later incorporation into your After Action Report.B.Protective Action Guides Plant Emergency Director, Recovery Hanager Radiation Protection Manager and Radiological Emergency Manager Refer to Attachment E,"Guidance in Administering Potassium Iodide", for guidance in developing recommendations to all emergency workers for the self-administration of (KI).Plant Emergency Director Shift Technical Advisor and Radiation Protection.
Manager OI Recovery Manager Radiological Emergency Manager and Protective Action Decision Group in HUDAC 2.3.Refer to Attachment C,"Protective Action Guide for Plume Exposure Path-way", for guidance in developing public PARs for the Plume Emergency Planning Zone.Refer to EPIP 13.14.2,"Process for Determining Protective Action Recommen-dations" for guidance in the handling of PARs and PADs.Recovery Manager, Radiological Emergency Manager and Protective Action Decision Group in HUDAC 4, Refer to Attachments F for standards in developing PARs for the Ingestion Zone.PROCEDURE NUMBER 13.14,1 WP 588 Rt I5 83)REVISION NUMBER PAGE NUMBER 13.14.1-3 of 15


Res onsibilit Action Life-Saving Emergency Worker 5.To avoid restricting actions that may be necessary to save lives, use your'udgement to determine the amount of exposure you will accept to perform emergency lifesaving actions (normally should not exceed 75 REN-see Attachment C).13,14.1.3 A.Attachments Supply System Administrative Exposure Guides B.10CFR20 Limits C.Protective Action Guide for Plume Exposure Pathway D.Additional Emergency LJorker Protective Action Guidance E.Guidance for Administering Potassium Iodide (KI)G.State Derived Intervention Levels (DILs), Ingestion Exposure Pathway State Radioactivity Contamination Guide State Surface Radioactivity Contamination Guide PROCEDURE NUMBER 13.14.1 REVIS1ON NUMBER PAGE NUMBER 13.14.1-4 of 15
MESSAGE:
%A SUPPLY SYSTEM ADMINISTRATIVE EXPOSURE GUIDES (a)NOTE: Authorization approval to exceed guides diFFers under emergency conditions, see EPIP 13.14.1.3 as allowed by Reference D.1.The admini strati ve exposure guide for the whole body shall be 300 mrem er da.This administrative exposure guide should not be exceeded without the prior approval of the Health Physics/Chemistry Manager or designated representative.
INFORMATION CONTACT                    NAME                PHONE Approved by:                                        Oate                    Time Attachment A PROCEDURENUMBER                        REVISION NUMBER  PAGE NUMBER 13.11.'13                                                    13.11.13-4 of 4 WP.598 Rl (9.83)
2.In keeping with the Supply System commitment to ALARA, the normal quarterly exposure guide is 1000 mrem, exposures greater'than 1000 mrem per quarter will be controlled by the Health Physics/Chemistry Manager who will ensure reasonable efforts are made to maintain personnel exposure to less than 5 rem per calendar year.3.For the calendar year, the external whole body exposure guide shall be 5.0 rem.Recommendations by the Health Physics/Chemistry Manager, concurrence of the Plant Manager and approval of the Assistant Managing Director For Operations is required to exceed this guide.(a)Reference C Attachment A PROCEDURE NUMBER 13.14.1 WP 598 II 1 (9.83)REVISION NUMBER PAGE NUMBER 13.14.1-5 of 15


-10CFR20 LIMITS (a)Permissible Ooses, Levels, and Concentrations 20.101 Radiation dose standards for individuals in restricted areas.(a)In accordance with the provisions of 20.102(a), and except as provided in paragraph (b)of this section, no licensee shall possess, use, or transfer licensed material in such a manner as to cause any individual in a restricted area to receive in any period of one calendar quarter from radioactive materials and other sources of radiation a total occupational dose in excess of the standards specified in the following table: REMS Per Calendar Quarter 1.Nhole body;head and trunk;active blood forming organs;lens of eyes;or gonads 1 1/4 2.Hands and forearms, feet and ankles 3.Skin of whole body 18 3/4 7 1/2 (b)A licensee may permit an individual in a restricted area to receive a total occupational dose to the whole body greater than that permitted under paragraph (a)of this section, provided: 2.Ouring any calendar quarter the total occupational dose to the whole body shall not exceed 3 rems;and The dose to the whole body, when added to the accumulated occupational dose to the whole body, shall not exceed 5 (N-18)rems where"N" equals the individual's age in years at his last birthday;and 3.The licensee has determined the individuals accumulated occupational dose to the whole body on Form NRC-4 or on a clear and legible record containing all the information required in that form;and has otherwise complied with the requirements of 20.102.As used in paragraph (b),"Oose to the whole body" shall be deemed to include any dose to the whole body, gonads, active blood-forming organs, head and trunk, or lens of eye.(25 FR 10914, Nov.17, 1960, as amended at 44FR32352, June 6, 1979)From the"Code of Federal Regulations-Energy-10 Parts 0-199 Rev.Jan 1, 1987.(a)Reference A Attachment 8 wP 598 Rl (983)13.14.1 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14 F 1-6 of 15 l~,"P+6~4, l PROTECTIVE ACTION GUIDE FOR PLUME EXPOSURE PATHMAY (a)Po ulation at Risk Projected Nhole Bod Gamma Dose rem Projected Thyroid Dose rem General population Emergency workers Lifesaving activities 25 75 125 (b)(a)Reference A (b)No specific upper limit is given for thyroid exposure since, in the extreme case, complete thyroid loss might be an acceptable penalty for a life saved.However, this should not be necessary if respirators and/or thyroid protection for rescue personnel are available.
masssswmsms ~I el Is  emllae 43  SUPPLY SYSTEM PLANT PROCEDURES MANUAL WNP-2 PROCEDURE NUMBER                                                         DATE 13.14.1                               g'pfj/ecu';ra                        06/25/90 VOLUME NAME 13          EMERGENCY PLAN INPLENENTING PROCEDURES SECTION 13.14       SUPPORTING    INFORMATION PROCEDURES TITI.E 13.14.1     EMERGENCY EXPOSURE      LEVELS/PROTECTIVE ACTION GUIDES 13.14.1.1       ~Pur  ose This procedure outlines the authority and process to exceed administra-tive exposure guides, and to implement 10CFR20 limits and implement emer-gency worker Protective Action Guides (PAGs). Additionally,                        it  provides Supply System, State, and Federal PAGs as references.                       PAGs are numerical projected or monitored doses or dose rates that act as trigger points to initiate Protective Action Decisions (PAOs) for Supply System emergency workers and field team members and/or trigger Protective Action Recommen-dations (PARs) for other emergency workers and/or the general public outside of the Supply System's area of authority. This procedure is divided into two parts: Part A deals with Emergency Exposure levels and Part B deals with PAGs.
Attachment C PROCEDURE NUMBER 13.14.1 VilP 598 IIl (9 83)REVISION NUMBER PAGE NUMBER 13.14.1-7 of 15 f t,~~"'+I'h pj"ol ADDITIONAL EMERGENCY MORKER PROTECTIVE ACTION GUIOANCE Function.Exposure Level Projected or Actual Oose/Rate Emer enc Action I~Oper ational and maintenance actions to limit accident.1.5 rem whole body.2~25 rem thyroid.3.75 rem extremities.
13.14.1.2        References A. 10CFR20.101      Radiation Dose    Standards            for Individuals in Restricted Areas B. Mashington State Oepartment of Health (OOH), Res ense Procedures                      for Radiation Emer encies, Appendix A, "Protective Action Guides" C. PPM  11.2.5.1     Personnel    Exposure Limits and Guides EPIP  13.14.2 - Process      for Determining Protective Action Recommendations      and   Protective Action Decisions PROCEDURE NUMBER                   REVISION NUMBER     PAGE NUMBER 13.14.1                         7                                            13.14.1-1 of 15 WP.597 R3 I2/86)
l.Emergency Operations Procedures (EOP)and activities associated with performing the procedures.
2.Volume IV), Abnormal Procedures, and activities associated with performing these guidelines.
3.Flaintenance activities to correct equipment and repair system under Emergency Operations Procedures and Volume IV, Abnormal Procedures.
II'iquid, air, and other environmental sampling under accident conditions.
1.5 rem whole body.2.25 rem thyroid.3.75 rem extremities.
1.Collect in-plant airborne and liquid samples.Use the Post Accident Sampling System (PASS).2.Oetermine offsite dose rate and collect environmental samples.III.Corrective or protective actions.25 rem whole body.2~125 rem thyroid.3.375 rem extremities.
l.Provide First aid, ambulance service, fire fighting.2.Any corrective or emergency action undertaken to plant systems and equipment For onsite and offsite safety purposes.Flay'nclude activation under EOP and Volume IV, Abnormal Procedures.
IV~l.ifesaving or rescue.l.75 rem whole body.2.No limit thyroid.(a)1.Rescue or removal of injured personnel from plant or offsite area.(a)Thyroid exposure should be minimized to the extent feasible by the use of respiratory protection and/or thyroid prophylaxis.
However, no upper limit is specified for life-saving action since complete loss of thyroid Function may be considered an acceptable risk for saving liFt.Attachment 0 Page 1 of 2 PROCEDURE NUMBER 13.14.1 WP 598 Rt (983I REVISION NUMBER PAGE NUMBER 13.14.1-8 of 15
"\tj ADDITIONAL EMERGENCY MORXER PROTECTIVE ACTION GUIOANCE{Continued)
Function or Actual Oose/Rate Emer enc Action V.Use and/or administration of Potassium Iodide (KI)for emergency workers.Refer to Attachment E.VI.Habitability
-Critical Area(b)A.Noncritical Functions 1.Projected dose rate to the thyroid greater than or equa'1 to 250 mrem/hr or radioiodine concentration are projected, expected, or measured to exceed 1.4 x 10 7 uci/cc (15 NPC).l.50 mrem/hr to whole body.1~Personnel in the Control.Room, Technical Support Center, Operations Support Center, and Emergency Operations Facility self-administer (KI).Potassium Iodide (KI)is available in kit located in each of the areas.2.If (KI)is not available, avoid activities in areas with dose projected to be greater than 250 mrem/hr to the thyroid or above 15 MPC.l.At 50 mR/hr whole body field, evacuate all emergency workers not critical to controlling the accident.(c)(Based on a 12-hour workday.)B.Cr itical Functions l.250 mrem/hr to whole body.l.At 250 mR/hr whole body field, limit time to critical workers to 12 hours or less.Take other corrective actions as appropriate to reduce exposure levels.(b)Critical areas include Control Room, Technical Support Center, and Emergency Operations Facility.(c)Evacuation of non'critical personnel to areas with lower exposure levels.Evaluations should be made to ensure that egress dose to the individual does not exceed the dose if the individual remained in the area.Attachment D Page 2 of 2 PROCEDURE NUMBER 13.14.1 IYP 598 B 1 (9 83)REVIStON NUMBER PAGE NUMBER 13.14.1-9 of 15 pl I f C GUIDANCE FOR ADMINISTERING POTASSIUM IODIDE KI A.~Per oee This attachment provides guidelines for recommending administration of potassium, iodide (KI)to all emergency workers both on and offsite as a thyroid-blocking agent to provide protection against airborne radioiodine.
8.Location of KI Su lies 1.Control Room 2.Technical Support Center 3.Operations Support Center 4.In-plant Emergency Equipment Cabinets 5.Emergency Operations Facility 6.Field Team Kits 7.Primary Access Point C.Procedure for Administration l.Within the protected area, the Plant Emergency Director, in consul-tation with the Radiation Protection Manager, shall recommend that emergency workers in the Control Room, Central Alarm Station, Operations Support Center, Technical Support Center, and any other Protected Area location deemed necessary, take KI: o When radioiodine concentrations in air are known, projected or expected to exceed 1.4 x 10>uCi/cc (15 NPC), if the projected dose rate to the thyroid is greater than or equal to 250 mrem/hr, or if the release is from an unmonitored source known to contain radioiodine.
2.The Radiological Emergency Manager shall recommend that Supply System emergency workers and all Field Teams at locations outside the Protected Area take KI and make the recommendation to the Recovery Manager for all other emergency workers: o When radioiodine concentrations in or expected to exceed 1.4 x 10 7 projected dose rate to the thyroid to 250 mrem/hr, or if the release is known to contain radioiodine.
air are known, projected uCi/cc (15 NPC), if the is greater than or equal from an unmonitored source Attachment E Page 1 of 2 PROCEDURE NUMBER 13.14,1 WP 598 Rl I983)REVISION NUMBER PAGE NUMBER 13.14.1-10 of 15 GUIDANCE FOR ADMINISTERING POTASSIUM IODIDE KI (Continued) 3.The Recovery Manager should transmit required protective action recommendations to authorities (State, County and DOE), recommending KI for emergency workers.4.Individuals recommending the use of KI tablets should direct personnel to follow the"Directions for Use" on the bottle's label (copy attached to each bottle).5.As directed by the Radiation Protection Manager, or the Radiological Emergency Manager for respective areas, personnel shall use respirators in addition to KI for thyroid protection.
6.Personnel precluded from taking KI due to medical or other reasons shall inform the Radiation Protection Manager or Radiological Emergency Manager as to their situation.
Attachment E Page 2 of 2 PROCEDURENUMBER REVISION NUMBER PAGE NUMBER WP 598 Rl (983)13.14.1 13.14.1-11 of 15 lt~f4 l'P;k k STATE DERIVED INTERVENTION LEVELS OILs INGESTION EXPOSURE PATHWAY Preventative Level a A, Total Projected Dose Commitment For One Year Ingestion++
Whole Body.Thyroid 0.5 rem 1.5 rem B.Deposition on Ground (picocuries/square meter)DERIVED INTERVENTION LEVELS 1-131 Cs-134 Cs-137 Sr-09 61,000+160,000 72,000 690,000 Sr-90 31,000 C.Deposition on Pasture (picocuries/kilogram) 23,000+64,000 31,000 260,000 11,000 D.Milk (picocuries/liter) 7,000+12,000 5,800 12,000 550 E.Water (picocuries/liter) 11,000+51,000 25,000 46,000 2,400 F.Leafy Vegetables (picocuries/kilogram) 7,800 12,000 6,000 13,000 580 G.Produce+++(picocuries/kilogram) 15,000+1,100 480',900 40 H, Heat (picocuries/kilogram)
I.Fish (picocuri es/kilogram) 38,000 14,000 7,300 15,000 12,000 13,000 6,300 13,000 680 590+Taken from the Infant Derived Intervention Levels: All other values taken from Child Derived Intervention Levels.++Except contaminated water ingested for only five days.+++The reason the produce numbers are low is that they do not include weathering.
Host produce is harvested when ripe and then stored, during which there is only decay.(a)Excerpted from State Department of Health (DOH)Procedures (Reference 8)Attachment F Page 1 of 2 PROCEOURE NUMBER 13,14,1 W17 598 Al (9 83)REVISION NUMBER PAGE NUMBER 13.14.1-12 of 15 ql~i F L' STATE DERIVED INTERVENTION LEVELS OILs INGESTION EXPOSURE PATHMAY Emer.enc Level a A.Total Projected Dose Commitment For One Year Ingestion++
Mhole Body Thyroid 5.0 rem 15.0 rem B.Deposition on Ground (picocuries/square meter)C.Deposition on Pasture (picocuries/kilogram)
D.Hi 1k (picocuries/liter)
E.Mater (picocuries/liter)
F.Leafy Vegetables (picocuries/kilogram)
DERIVED INTERVENTI'ON LEVELS I-131 Cs-134 Cs-137 Sr-89 Sr-90 610,000+1,600,000 720,000 6,900,000 310,000 230,000+640,000 310,000 2,600,000 110,000 70,000+120,000 58,000 120,000 5,550 110,000+510,000 250,000 460,000 24,000 78,000 120,000 60,000 130,000 5,800 G.Produce+H.(picocuries/kilogram) 150,000+11,000 4,800 39,000 400 H.Heat (picocuries/kilogram)
I.Fish (picocuri es/ki 1ogram)380,000 140,000 73,000 150,000 6,800 120,000 130,000 63,000 130,000 5,900+Taken from the Infant Derived Intervention Levels: All other values taken from Child Derived Intervention Levels.++Except contaminated water ingested for only five days.+++The reason the produce numbers are low is that they do not include weathering.
Host produce is harvested when ripe and then stored, during which there is only decay.(a)Excerpted from State DOH Procedures (Reference 8)Attachment F Page 2 of 2 j I PROCEDURENUMBER 13.14.1 V/P 593 Rl (9 83)REVISlON NUMBER PAGE NUMBER 13.14.1-13 of 15 STATE RAOIOACTIV ITY CONTAMINATION GUIDE (a)ALPHA[l]dpm/per 100 cm2 BETA-GAMMA[2]
dpm/per 100 cm2 Emergency Worker General Public Emergency Worker General Publ i c Personnel[3]200 100 2000 1000 Clothing and Personal Equipment 200 100 2200 1000 Vehicles and l.arge Equipment 2000 100 5000 2000[1]Nuclear Wea on Accident Res onse Procedures Manual, Department of Defense, January 1984.[2]Pre aredness and Res onse in Radiation Accidents, Devices and Radiological Health PB 84-104736, August 1983.Persons Accidentl Contaminated with Radionuclides, 1980.(a)Excerpted from state Department of Health Procedures (ReFerence 8), however, not included in the base document is the applicability of this guide to smearable contamination only.Attachment G OCEOURE NUMBER 13.14.1 WP 593 RI (9 83)REVISION NUMBER PAGE NUMBER 13.14.1-14 oF 15
~lg'I'iC e d'f 1 4 STATE SURFACE RADIOACTIVITY CONTAMINATION GUIDE+[dl Areas and/or items.that have radioactive contaminants exceeding the levels specified in this guide shall be decontaminated, restricted from access and/or use by the public, or removed, packaged, and disposed of as radioactive waste.This guide also applies to personnel that may become contaminated.
ITEM 1.Personnel ACTION;LEVEL V Less than 100 cpm(b)100-1000 cpm(b)ACTION Unconditional release.Decontaminate if time a 1 1ows;may be re leased without decontamination if necessary; Greater than 1000 cpm(b)Decontamination required.2.Personal Belongings
,(Except Clothing), Equipment, Tools, Vehicles, Other Materials/items Less than 1000 cpm(b)Greater than 1000 cpm(b)and/or equal to or greater than 1 mR/hr I Unconditional use.Decontaminate; hold for radioactive decay or disposal as radioactive waste.3.Areas (Equal to or[e])Less than 1 mR/hr Less than.2 uCi/m2 (alpha)Greater than 1 mR/hr (Greater than[e]).2 uCi/m2-6 uCi/m~(alpha)Uncontrolled access to area.Limited precautions may be recommended.
Control access to area until decay to below these levels or decontaminate area.[a]Above background.
[b]At 1/2 inch, using a beta-gamma pancake or thin-end window G-M survey meter;cpm=counts per minute as read from the survey meter.[c]dpm=disintegrations per minute, determined by correcting the cpm observed by the appropriate background, efficiency, and geometric factors for the counting instrument used.[d]Excerpted from state Department of Health Procedures (Reference B)[e]Not included in base document.+The purpose of this guide is only to indicate if surface contamination is about or below the established levels.Attachment H ROCEDURE NUMBER 13.14.1 Wt 598 R1 (983)REVISIGN NUMBER PAGE NUMBER 13.14.1-15 of 15


PROCEDURE NUMBER 13.14.3%4%HIWQeIIK eI 1I Ie'iiN~~b3 SUPPLY SYSTEM PLANT PROCEDURES MANUAL WNP-2 APPROV D 04/28/89 Vol.UME NAME 13 EMERGENCY PLAN IMPL SECTION ENTING PROCEDURES 13.14 SUPPORTING INFORMATION PROCEDURES SUPPLY SYSTEM HEALTH PHYSICS PROCEDURES, RADIOLOGICAL PROGRAMS 13.14.3 INSTRUCTIONS, AND ENVIRONMENTAL PROGRAMS INSTRUCTIONS 13.14.3.1~Pur ose This procedure provides instructions on the use of Health Physics Proce-dures from the Plant Procedures Manual, the Radiological Programs In-structions Manual, and the Environmental Programs Instruction Manual for emergency activities.
4 ~
This guidance is divided into three parts, apply-ing to Health Physics Procedures in the Plant, Radiological Program Instructions in.the Emergency Operations Facility, and Environmental Programs.Instructions.
n 13.14.1.3   Procedure A. Emer enc     Ex  osure Levels Res  onsibi  lit                                        Action Radiation Protection Manager             l. Apply the principles of        ALARA.
13.14.3.2 References A.MNP-2 Plant Procedures Manual, Volume No.11,"Health Physics Procedures" B.Radiological Programs Instruction Manual C.Environmental Programs Instruction Manual 13.14.3.3 Procedure A.Plant Emer enc Activities Action Radiation Protection Manager 1.Health Physics/Chemistry Personnel Utilize the applicable Health Physics Proce-dures in Volume No.11 of the Plant Proce-dures Manual during emergency situations During a declared emergency, refer to the Special Instructions and Modifications, Attachment A, for details of.the projected PROCEDURE NUMBER 13.14.3 WP.597 R3{2/88)REVISION NUMBER PAGE NUMBER 5 13.14.3-1 of 8 Res onsibilit Radiation Protection Manager Health Physics/Chemistry Personnel (cont'd)Radiation Protection Hanager (RPH)Action changes to Volume No.11 of the Plant Procedures Manual (normal Health Physics Procedures) during emergency activities.
(for emergency   workers'within the Protected Area) and                   2. If    practical,     do  not authorize 'expo-Radiological Emergency Manager                  sures exceeding Supply System Adminis-(for Supply System emergency                    trative Exposure Guides (Attachment A).
Refer to Attachment B for projected changes of RPI's which may effect plant Health Physics operations.
workers and field team members at any location outside of the Protected Area)                          3. When    necessary,    authorize exposure(s) in excess        of Supply System Admini-strative Exposure Guides (but not to exceed 10CFR20 Limits, Attachment 8).
2.Review and approve changes to the normal practices specified in the Health Physics Procedures as outlined by Attachment A.B.Emer enc 0 erations Facilit Activities Res onsibi lit Radiological Emergency Manager/HUOAC Staff (to include State and Federal Representatives Radiological Emergency Manager (REM)Action l.Utilize the listing of procedures and instructions in Attachment B for guidance applicable to the work performed at the Emergency Operations Facility.2.Take the'appropriate actions in the listed procedures and instructions in Attachment B.This is a compilation of procedures applicable to emergency activities, and the Special Instructions column details modifi-cations to the procedure.
: 4. Prior to authorizing increased expo-sures, if practical review individual exposure histories on the Radiation Exposure Records        (RER) System.
This column also provides additional guidance and criteria for use of the procedure.
: 5. Caution      personnel    to maximize efforts to  remain below 10CFR20      Limits.
3.Review and approve changes to Supply System procedures used in the Emergency Operations Facility as authorized by Attachment B.C.Offsite Emer enc Activities Res onsibi lit Action Radiological Emergency Manager/Environmental Field , Monitoring'eams/
: 6. Oocument authorization          and   include in After Action Report.
Offsite Recovery Teams 1.Review the listing'of procedures and instructions in Attachment C for guidance applicable to the work performed in the field.PROCCOURC NUMSSR 13.14.3 RCV SION NUMIIKR PROD NUMSER 13.14.3-2 of 8 WPiS~S Rl{SiSS)  
: 7. As    needed, 'obtain permission from the Plant    Emergency Oirector or Recovery Manager (as applicable) to implement emergency exposure guides above 10CFR20 limits.
: 8. When    implementing the emergency expo-sure    guides    for emergency workers, ensure    that:
: a. Persons    involved are volunteers who  are broadly familiar with the consequences of such exposures.
: b. First consideration        is given to volunters above the     age  of 45.
C. Women    of child bearing        age  are not normally included.
PROCEDURE NUMBER                  REVISION NUMBER    PAGE NUMBER 13.14.1                                                                13.14.1-2 of   15 wP.598 At I9 83)


Res onsibilit Action Radiological Emergency Manager/Environmental Field Monitoring Teams/Offsite Recovery Teams (cont'd)2.Take the appropriate actions to perform the ,Field Team/Recovery Team activities.
Res   onsibi lit                                          Action Plant Emergency Director                    9. Evaluate alternatives prior to granting (for emergency workers within                      authorization to exceed Attachment 8, the Protected Area) and                           "10CFR20 Limits".
Attachment C is a compilation of the Envi-ronmental Programs Instructions applicable to Emergency Field Team activities.
Recovery Manager (for Supply System emergency                10. Nhen authorizing exposures          in excess of workers and field team members                    10CFR20    Limits, refer to       Attachment C at any location outside of the                     "Protective Action Guide For Plume Protected Area)                                    Exposure Pathway" and Attachment 0, "Additional Emergency Morker Protective Action Guidance".
The Specia1 Instructions column of Attachment C provides, details of the modifications to the procedures and additional guidance.Radiological Emergency Manager 3.Review and approve changes to Offsite Field Monitoring and Recovery Team procedures as outlined by Attachment C.Approval of procedures will be a coordinated effort between the Supply System and Washington State DSHS.13.14.3.4 Attachments A.Plant Health Physics Procedures Modifications for Emergency Activities 8.Radiological Programs Instructions (RPIs)App'licable for Emergency Operations Facility Emergency Activities C.Environmental Programs Instructions (EPIs)and Health Physics Procedures Modifications for Offsite Emergency Activities PROCKOURK NUMBKR 13.14.3 RKVIKION NUMBKR PAOK NUMQKR 13.14.3-3 of 8 WP Sll R'I Ilill) 0 0 0 m 0 C m CD i m m~m PPII P P 11.2.2 Procedure Title AIAAA HTA PLANT IIEALTII PHYSICS PAOCFOUAFS MOOIFICATIOHS FOR OHSITE EMERGEHCY ACTIVITIES' ecial Instructions and Nodlfications P'" 11.2.2.1 through 11.2.2.8 ALARA Procedures ARP, AI, Exposure Accounting, etc.Radiation Protection All Manager (RPN)Objectives of the Supply Systan ALAAA policy are to be maliitalned throughout the emergency.
Author i ze    uti i za t i on 1              of app 1 i cabl e emergency      guides      in Attachments C and 0,      when    necessary,      and    after consultation        with      the      Radiation Protection      Manager,      or with the Radiological        Emergency       Manager    For respective areas,
Ilowever, the necessity for prompt action during the anergency prohibits formal ALARA evaluation and docgnented exposure planning.AIARA activities will be determined by Supply System Emergency Management.
: 12. Document      authori za t i on    for later incorporation into your After Action Report.
m 0 2 2 C CO m u 0 m 2 P" 3l Xl 11.2.5 PERMISSIBLE EXPOSURE LIMITS P 11.2.5.1 Personnel Exposure Limits and Guides 11.2;5.2 Authorization to Exceed Mnlnlstrative Exposure Guides 11~27.'"-AREA P+11;2.1:I-'''-Area COHTROL AHD LINITS Postings-.!'1.2.1.2 Entry Into, Conduct In, and Exit Free Controlled Areas Radlatlon Protection All Manager (RPN)Radiation Protection Manager (RPN)Alert," Site;Area, General Radiation Protection Manager (APN)Alert, Site Area, General See EPIP 13.14.1"Emer-All: gency Exposure Levels/PAG's For Limits of"-;Authorltles.
B. Protective Action Guides Plant Emergency Director,                         Refer to Attachment E, "Guidance in Recovery Hanager                                  Administering Potassium Iodide", for Radiation Protection Manager and                  guidance in developing recommendations Radiological Emergency Manager                    to all emergency workers for the self-administration of (KI).
P\Emergency exposure limits, guides and authorization scheme are In EPIP.am', 13.14.I,"Emergency Exposure Levels/Protective Action Guides.Honaal+4'xposure limits=and guides are reestablished when the recovery phase Q ls declared.;
Plant Emergency Director                    2. Refer  to Attachment          C"Protective Shift Technical Advisor      and                 Action Guide for Plume Exposure Path-Radiation Protection.      Manager               way", for guidance in developing public OI                                                PARs for the      Plume Emergency Planning Recovery Manager                                 Zone.
.See Authorization scheme and levels ln EPIP 13;14.1"Emergency Expo: sure Levels/Protective Action GuidesaP Q P P~"..L--.-C,'P.fA: Hoimai;Health;Physlci PProcedures do'not apply.Post the'ighest dose rate reading along with date and time on the door/entrance way to each area entered lf time permits.Ilonnai area posting will be reestabllshed at the beglnnlng of the recovery phase.Note: Access control ls to be malntalned for entry Into anergency g-areas.Cpa I 11.2.7.4 I.11.8 I.I I.8 Discrete Radioactive Particle Control RAOIATIOH WORK PERMIT Radiation Work Permit Radiation Protection Manager (RPM)Radiation Protection Manager (RPM)Alert, Site Area, General Alert, Site Area, General This procedure may be modified or suspended verbally by the Radiation Protection Manager as necessary but normally will remain in effect.The Radiation Wor'k Permits in effect are suspended.
Radiological Emergency Manager and                                         3. Refer to EPIP 13.14.2, "Process for Protective Action Decision        Group          Determining Protective Action Recommen-in HUDAC                                          dations" for guidance in the handling of  PARs and     PADs.
Radiation Work Permits will bi.replaced by<<ontlnuous monitoring by Ilcalth Physics Technicians or as directed by the Radiation Protection Manager.Honnal Radiation Work Permit use will bc rccstablishcd for the recovery phase.i This attaclvnent is a conyllation of procedures that are modified during emergencies at the nuclear facility.All other applicable llealth Physics Procedures vill be used in the normal manner.i i Plant Procedures Manual.  
Recovery Manager,                           4,   Refer to Attachments F for standards in Radiological Emergency Manager                   developing PARs for the Ingestion Zone.
and Protective Action Decision Group in HUDAC PROCEDURE NUMBER                REVISION NUMBER      PAGE NUMBER 13.14,1                                                                13.14.1-3 of      15 WP 588 Rt I5 83)


0 rl 0 C Pl GO i Pl PPM Ir 11.2.13 RAOIOlOGICAL SURVEYSATTACIRIEIIT A (contd.)PLNIT IIEAL)II PIIYSICS PROCEOURES MODIFICATIONS FOR OIISIIE ENFRG FNCY AC I IVIT IESP S eclal Instructions and Modifications 11.2.13.1 Olrect Area Radiation and Radiation Protection Contamlnatlon Surveys Manager (RPII)Alert, Site Area, General Contamination and radiation surveys will be made as directed by the Radiation Protection Manager.Norma)routine area surveys will be discontinued and replaced by surveys requlrcd to support emergency activities.
Res onsibilit                                        Action Life-Saving Emergency Worker            5. To  avoid restricting actions that may be necessary to save lives, use your
Pl (0 2 2 C Q Pl 11.2.14 REC~EIPT STO~RAGE ANO)RANSFER OF RADIOLOGICAL MA)ERIAL 11.2.13.3 Personnel Decontamination Radiation Protection Survey Manager (RPM)Alert, Site Area, Illgher contamination levels can be allowed by the Radiation Protection Genera I Nanager pursuant to FPIP 13.10.4.Documentation requirements remain ln effect.C4 CP 1 Vl 11.2.14.3 Storage of Radioactive Material Radiation Protection Manager (RPM)11.2.14.8 Transfer of Radioactive Materials Between Facilities Radiation Protection Nanager (RPN)11.2.15 CONTANINAT ION CONIROL 11.2.15.5 Area Oecontaminat Ion.Radiation Protection Manager (RPN)11.2.15.2 Skin Decontamination Radiation Protection Manager (RPM)Alert;Site Area, General Alert, Site Area, General Alert, Site Area General A)crt, Site Area, General Normal storage requirements suspended.
                                                        'udgement to determine the amount of exposure you will accept to perform emergency   lifesaving actions (normally see should    not exceed      75  REN Attachment C).
Supply System Radiation Pro-tection Manager and Radiological Emergency Nanager will provide guid-I ance and requirements.
13,14.1.3    Attachments A. Supply System Administrative Exposure Guides B. 10CFR20  Limits C. Protective Action Guide for      Plume Exposure    Pathway D. Additional    Emergency LJorker  Protective Action Guidance E. Guidance    for Administering  Potassium Iodide (KI)
XI Transfer of radioactive material under normal operating procedures Q (samples)between the plant and Emergency Operations Faci)ity will be suspended, Logs oF sarrp)es sent to the Emergency Operations Facility for analyses are to be kept.Transfer betwren the plant and Finer-Pl gency Operations Faci)I ty wl1)be directed by thc Radiation Q Protect'ion Manager and the Radiological Emergency Managir.Iligher contam'Ination levels can be allowed by the Radiation Protection.
State Derived Intervention Levels (DILs), Ingestion Exposure Pathway G. State Radioactivity Contamination Guide State Surface Radioactivity Contamination Guide PROCEDURE NUMBER             REVIS1ON NUMBER   PAGE NUMBER 13.14.1                                                             13.14.1-4 of 15
Manager pursuant to EPIP 13.10.4.Ooclrnentatlon rcqulrrinents remain in effect.I Ccntamlnatlon boundary limits vill remain unchanged.
Other allowable levels will hc determined by the Radiation Protection Manager, based on thc need for entry into or control of areas.Norma)Ilralth Physics practices will bc used For Recovery activities.
11.2.15.1 Release of Material Free Radiation Protection Radlologlca))y Contro))ed Manager (RPN)Areas Alert, Site Area, Norma)procedures wll)bc suspended.
Requirements will be estab-General lished by the Radiatlnn Protection Nanager and Radio)oglcal Finergency Nanager.l)his attadrnent Is a conyilatlnn oF procedures that are rnodiflcd during emergencies at the nuclear facility.AI)other appllcahle Nea)th I'hysics Procrdurrs vill be used in the norma)manner.
i edt adp 0 0 yct 0 Cpa CI m CcO ATTACIAIENI B~acedure'd Procedure patte S eclaI Instructions and IIodif ications 4.0 EXTERIUIL DOS IHETAY RAOIOIOGICAL PAOGlVIIS INSIAUCTIOHS+APis~APPLICABLE FOR DIERGEHCY OPERATIONS FACILITY EIIERGEHCY ACTIVIIIESt
&#xc3;I m 0 2 2 C X m Lh n 2 C Xl RPI 4.9 Routine Exchange of Personnel TI.D Badges Aadiologlcal Emergency Site Area, Hanager (REII)and General Radiological Protection Hanager (RPII)RPI 4.11 RPI 4.12 Processing, Evaluating, and Reporting Extremity Tlgs Processing, Evaluating, and Reporting Results of Enviromncntal TIOs Rad'iolog i ca I Emergency All Hanager (REN)Radi ologl ca'I Emergency Al'I Hanager (REN)IIPO 3.1o5" Permlsslb'le Exposure I.iml ts Radiological Emergency All Hanager (REII)HPD 3.1.2 As Low As Reasonably Radiological Emergency All Achievable (AIARA)/Hanager (REII)Normal TI.O badge changeout will be suspendi.d.
Special emergency badge exchanges will be made as necessary.and personnel held out of areas until results have been determined.
Io carply with the emer-gency exposure levels as listed in EPIP 13.14.I,"Imrgency Exposure levels/Protcctlve Action Guides", the Radiation Protection IIanager wili determine the badges that need to be exchanged in the plant and the Radiological Emergency Hanager will dctenn1ne badges that need to be.exchanged in the Emergency Operations Facility.Normal routine exchanges will be reestablishcd when the recovery phase is declared..A Hethods of reporting exposures to emergency personnel will be deter-mined by the Radiological Emergency Hanager.Homal RPI m'ethods wil be recstabllshed when the recovery phase is declared.Normal practices will be used for processing and reporting TLO gg results.The Radiological Emergency Hanager, in consultation with the State DSIIS, will determine the need for recovery of TLOs from t oFfsite environmental TLD locations.
aejecttucc op tha supply cyctaa dtltlm pot tcy are to ue matatataed III~throughout the emergency.
However, the necessity For prompt action gg during the emergency prohibits formal ALAAA evaluation and docancntcd exposure planning.AlARA activities will be determined by Supply Ql'ystem Emergency Hanagement.
Q Fsergency exposure limits, guides and authoiization scheme are in EAIP 13.14.1,"Emergency Exposure levels/Protective Action Guides".HorsRC exposure llmlts and guides are reestablished when the recpvery phase is cdeclared.
Co Caa I Cxt RPI 12.1 Radiation Work Permit Radiological Emergency Alert, Site Area, Hanager (REII)General 1he Radiation Work Permits in effect are suspended.
Radiation Work Permits will be replaced by continuous monitoring by Health Physics Technicians or as directed by the Radiological Emergency ttanager.Noreal Radiation Work Perm'it use will be reestabllshcd for the recovery pltase.i This attachment ls a contpilatlon of procedures that are modified during emergencies at the nuclear facility.All other applicable Ilealth Physics Procedures will be used in the normal manner.pI Plant Procedures Hanual.
Ik D~0 0 n m 0 C ill c X Xl Proceduce I RPI I2.29 RPI 12.30 ATTACIRIENT 6 (cantd.)Procedure Tit)e Posting oF Control Areas Fntry Into, Conduct ln, and Exit Fram Controlled Areas Radiologica)
Fmcrgcncy Nanager (REN)Radiolog'ical Emergency Nanager (AEN)Alert, Site Area, General Alert, Site Area, General 5 ecial Instructians and Nodiflcatinns Normal Nealth Physics Procedures do not apply.Post the highest dose rate reading along vith date and time on the door/entrance vay to each area affected if time permits.Norma)area posting will be reestablished at the beginning of the recovery phase.Nate: Access control is to'be maintained for entry into emergency areas.RADIOLOGICAL PROGIIAIIS IINIIIIIC1INIS lIIPlll APPLICIIOIE FOR EMEIIRENCY OPERAYINIS FACll~ll EIIERGEIICY IICIIIIIYIESI Col ca I O m 0 2 2 C X CE ill RPI 12.33 API 12.34 RPI)2,31 RPI 12.39 RPI 12.40.RPI 12.53 RPI 12.51 Decontamination of Mark Areas Oecan of Personnel Transfer of Radioactive Naterials Oetueen Facilities Release of Naterlal'From Radio)oglcal)y Controlled Areas Radiation/Contamination Surveys Personnel Contamination Survey Storage of Radioactive Nater)al Radiological Emergency Nanager (AEN)Radiological Emergency Nanager (AEN)Radiological Emergency Nanager (REN)Radiolgical Emergency Nanager (RFN)Radiological Emergency Nanager (REN)Radiological Finergcncy Nanager (REN)Radio)ogical Emergency Nanager (RFA)Alert, Site Area, General hlert, Site Area, General A)crt, Site Area, General A)crt, Site Area, General A)crt, Site Area, Genera)Alert, Site Area, General A)crt, Site Area, General Contam'ination boundary limits uill remain unchanged.
Other allowable levels uill be determined by the Radiological Fmergency Nanager, based on the need for entry into or contro)of areas.Norma)Nealth Physics practices wl)1 be used for Recovery activities.
Nigher contamlnatlon levels can bc allowed by the Radio)aglcal Emergency Nanager pursuant to EPIP 13.11.1.OacunentatialC
-requlrancnts remain in effect.EE Transfer of rad'ioactlve mater'lal under normal operating procedures (samp)es)between the plant and Emergency Operations Facility will be suspended.
togs of savy)es sent to the Emergency Operations Faci)lt for analyses are to be kept.Transfer between the plant and Emcr gency Operations Fac))ity ulll be directed by the Radiatioi Protection Nanager and the Radiological Emergency Nanager.I FA Normal procedures wil)be suspended.
Requirements ui)l he estab-lished by the Radiation Protection Nanager and Radiological Emergency Nanager.A Contamination and radiation surveys vl)I be made as directed by the C Radiological Emergency Nanager.Norma)routine area surveys vill he@discontinued and replaced by surveys required to support ancrgen~activities.
G Nigher contamlnatlon 1cvels can be a)lowed by the Radio)oglcal Emergency Nanager pursuant to EPIP 13.11.1.Dnclvtsentat)on requirements remain ln effect.Norma)starage rcqulrancnts suspended.
Supply Systan Radiation Pro-tection Nanagcr and Radlologlca)
Emergency Nanager will provide guid-ance and requirements.
ln thc norma)manner.
'I"r
~~I I I'I I~~I~~I~~I~I I I I~I~I'I~~~~~~~I~~~I.~~I~~I~'I~\~I',~~~~'~I.~I'I\I I~~I~I.~I I~I I I~.I~.~I I\~~~'~I I~I I~~I\'~~~.~~~~I~'~~~~~I~~I~I I I~I~~'~~~~~.~~I~~~I~~I~~'~~~I.I~'~~~~~I I~~I I, I~4~I'~~I'I'<<~~~\.II~~\~~I'~I I I I'I~
pf II4%HIWrellI
~4 elle ell'e~e 4J SUPPLY SYSTEIVI PLANT PROCEDURES MANUAL WNP.2 PROCEDURE NUMBER 13.14.4 Apeeoveo g~~DATE 03/22/90 VOLUME NAME 13 SECTION EMERGENCY PLAN IMPLEMENTING PROCEDURES 13.14 SUPPORTING INFORMATION PROCEDURES TITLE 13.14.4 EMERGENCY EQUIPMENT 13.14.4.1~Per ose This procedure describes requirements For inspection, inventory, and functional testing oF emergency equipment and supplies which are not maintained under other approved procedures.
Quantities distinguish between items that are required, which must be present;and items that are desired, which may be present to enhance emergency operations.
13.14.4.2 References A.EPIP 13.14.9, Emergency Program Maintenance B.NUREG 0654 13.14.4'Procedure Res onsibi lit Action Supervisor, Health Physics, l.tt1lNP-2 Ensure that the following cabinets are checked in accordance with the instructions outlined in Attachment A,"NNP-2 Emergency Equipment".
Radiolo ical and Fire Emer enc Cabinets Locations:
o Kit lE-Service Building, 441'levation, Operations Support Center (OSC).o Kit 2E-441'levation, Radwaste Reactor Building Corridor Junction.PROCEDURE NUMBER 13.14.4 WP 587 R3 (2/88)REVISION NUMBER PAGE NUMBER 13.14.4-1 of 91 I+)k T"qa Res onsibi lit Supervisor Health Physics, WNP-2 (Cont.)Action o Kit 3E-471'levation, Radwaste/Turbine Generator Building Corri-dor.o Kit 4E-501'levation, Radwaste/Turbine Generator Building Corri-dor at Control Room door.o Kit 5E-487'levation, Radwaste Building outside Chemistry Laboratory.
Decontamination Kits: Locations:
o Kit 10-Service Building, 441'levation, Access Control.o Kit 2D-Radwaste Building, 487'levation,=Decontamination Locker, Men's Locker Room.o Kit 30-Radwaste Building, 487'levation, Decontamination Locker, Women's Locker Room.First Aid Kits: Location: o Kit 1FA-441', Service Building, First Aid Room.Kit 2FA-487'levation, Radwaste Building, Health Physics Office.Kit 1FB-441'levation, Service Building, Operations Support Center (OSC)o Kit 2FB-441'levation, Rad'-waste/Reactor Building Corridor Junction.o Kit 3FB-471'levation,.Rad-waste/Turbine Generator Building Corridor.~*PROCEDURE NUMBER 13.14.4 REVISION NUMBER 9 PAGE NUMBER 13.14.4-2 of 91 WP 508 Al (9.83)  
~k pt CQMmQLLEG CQPY Res onsibi lit Supervisor Health Physics, WNP-2 (Cont.)Action o Kit 4FB-501'levation, Radwaste/Turbine Generator Building Corr-idor at Control Room Door.o Kit 5FB-4B7'levation, Radwaste Building outside Chemistry Labor-atory.~Emer enc Protection Kits: Location: o Kit EPK-Technical Support Center 2.Completed record forms are to be forwarded to the Manager, Emergency Planning.Shift Manager.3.Ensure that the following alarm systems are demonstrated in accordance with the instructions outlined in Attachment A,"WNP-2 Emergency Equipment." Plant Exclusive Use Si nals: Location: Control Room o Alerting Tone o Immediate Evacuation Alarm 4.Complete record forms and forward them to the Hanager, Emergency Planning.Supervisor, Radiological Services 5.Ensure the following are checked in Accor-dance with the instructions outlined in Attachment B,"Emergency Operation Facility, Emergency Equipment".
Field Monitorin Kits: Location: o Plant Support Facility and Headquarters PROCEDURE NUMBEA 13.14.4 REVISION NUMBER 9 PAGE NUMBER 13,14.4-3 of 91 WP.598 AI (9 83) 4l E1 1j 1 CQNIQLLED CQPY Res onsibi lit Supervisor, Radiological Services (Cont.)Action Oecon Stora e Trailer: Location: o Plant Support Facility River Evacuation Kits: Location: o Headquarters Aerial Monitorin Kit: Location: o Headquarters E ui ment for PASS: Location: o Ambulance Bay o Counting Room o Chemistry Lab 6.All completed record forms are to be for-warded to the Manager, Emergency Planning.Supervisor, Communications Services 7.Ensure that the Communications Systems are checked in accordance with the instructions outlined in Attachment E,"Communications System".8.Completed record forms are to be forwarded to the Manager, Emergency Planning.PROCEDURE NUMBER 13.14.4 REVISION NUMBER 9 PAGE NUMBER 13.14.4-4 of 91 WP 59$RI (0 83) 1 gg ,4 Res onsibi lit Action Assigned Personnel (As Listed Below)9.Ensure the following emergency centers are checked in accordance with the instructions outlined in Attachment G,"Emergency Center Equipment and Supplies".
Completed record forms are to be forwarded to the Hanager, Emergency Planning.Manager, WNP-2 Operations Manager, WNP-2 Administration Manager, WNP-2 Modifications 8 Upgrades (Site Support Manager)o Control Room o Technical Support Center o Operations Support Center o Alternate Operations Support Center o Supply System Decision Center Hanager, Security Programs o Security Decision Center Senior Specialist, State Liaison (Offsite Agency Coordinator) o EOF Communications Center o H(}Communications Center o Offsite Agency Coordination Center Manager, Generation Engineering Manager, Records Management Manager Radiological Programs and Instrument Calibration (Radiological Emergency Manager)o Technical Data Center o EOF Records Rooms o Meteorology and Unified Dose Assessment Center Senior Media Coordinator (EOF Public Information Officer)o Media Briefing Preparation Area Manager, Emergency Planning Manager, Facilities Services (Hg Administrative Support Supervisor) o NRC Work Area o Crisis Management Center Director, Administration 5 Information Services (Joint Information Center Director)o Joint Information Center PROCEDURE NUMBER 13,14.4 WP.598 R1 (9 83)REVISiON NUMBER PAGE NUMBER 13.14.4-5 of 91
~I J t~r t, I;'it Res onsibi 1 it Action Hanager, Health and Sciences 10.Ensure that the Emergency Operations Facility Medical Equipment and supplies are checked in accordance with Attachment F,"EOF Emergency Medical Equipment and Supplies".
Manager, Emergency Planning ll.Completed record Forms are to be forwarded to the Manager, Emergency Planning.12.Ensure the following cabinets are checked in accordance with the instructions out-lined in Attachment C,"Hospital Radiolog-ical Emergency Kits".Hos ital Radiolo ical Emer enc Kits Locations:
o Kadlec Hospital, Emergency Room.Storage Cabinet o Kennewick Hospital, Emergency Room Storage Closet o Our Lady of Lourdes, Decon Shower Room o Yakima Valley Memorial, Autopsy Room 13.Ensure the Emergency Telephone Directory is maintained in accordance with the instruc-tions outlined in Attachment 0,"Emergency Planner Communications System Tests".14.Ensure the dedicated telephone lines are checked in accordance with the instructions outlined in Attachment 0,"Emergency Planner Communications System Tests".15.Monitor compliance with this procedure's
.requirements, take action to insure dis-crepancies are corrected, and maintain auditable records oF performance of all required checks.PROCEDURE NUMBER 13.14.4 WP 598 RI I983)REVISION NUMBER PAGE NUMBER 13.14.4-6 of 91 lP<P 4g Manager, Emergency Planning (Cont.)Action 16.Ensure signs are checked in accordance with the instructions of Attachment J,"Off-site Emergency Signs".HPC Coordinator 17.Ensure that the HVAC is checked in accor-dance with instructions outlined in Attach-ment K,"Ventilation Radiation Monitoring".
18.Complete record forms are to be forwarded to the Manager, Emergency Planning.Supervisor, Facility Maintenance 19'nsure that the HVAC and diesel generators are tested in accordance with instructions outlined in Attachment L,"Facility Systems Tests".20.Completed record forms are to be forwarded to the Manager, Emergency Planning.13.14.4.4 Attachments A.B.C.WNP-2 Emergency Equipment EOF/Headquarters Emergency Equipment Hospital Radiological Emergency Kits 0.F.G.H.K.L.Emergency Planner Communications System Tests Communications System Tests EOF Medical Equipment and Supplies Emergency Center Equipment and Supplies Sign-In Sheet Sign-Out Sheet Off-Site Emergency Signs Ventilation Radiation Monitoring Fac'ilities Systems Tests PROCEOURE NUMBER 13.14.4 WP 59B Rl (983)REVISION NUMBER 9 PAGE NUMBER 13.14.4-7 of 91


WNP-2 EMERGENCY E UIPMENT A-1 WNP-2 Radiological and Fire Emergency Cabinet and Fire Response Van A-2 WNP-2 Oecontamination Kits A-3 WNP-2 First Aid Kit, Type A A-4 WNP-2 First Aid Kit, Type 8 A-5 WNP-2 Emergency Protective Equipment Kit (TSC)A-6 Plant Exclusive Use Signals e PROCEDURE NUMBER 13.14..4 WP 598 RI I9 aI)REVISION NUMBER 9 Attachment Section A Page 1 of 1 PAGE NUMBER 13.14.4-8 of 91 I V*k',
%A SUPPLY SYSTEM ADMINISTRATIVE EXPOSURE GUIDES        (a)
ITEMS IN/NEAR WNP-2 RAOIOLOGICAL ANO FIRE EMERGENCY CABINET QUANTITY Ai r Purifying Respirator Respirator Filter Battery, 6 Volt Lantern Battery, 0 Cell Bolt Cutter Chain Wrench Sledge Fire Axe Pinch Bar Hacksaw Frame/Blade Pocket Knife Fire Hose Wrench Pipe Wrench 6 Volt Lantern Safety Belt Nylon Rope, 100 Feet Leather Gloves High Voltage Gloves 8 Leather Covers Fireman Turnout Gear-Boots-Coats-Hood-G.loves-Helmet/Shi el d Scott Air Pak Scott Spare Bottles Protective Clothing-Covera 1 1 s-Rubber Boots-Plastic Booties-Glove Liners-Rubber Gloves-Hood/Cap Survey Instrument, Oose Rate Survey Instrument, Count Rate (GM Pancake Probe)Masking Tape Pocket Oosimeters, 200 R Oosimeter'harger Iodine Tablets (~OSC onl)Silver Zeolite Cartridge (Iodine Sampling)5 5 5 Sets 1 5 1 28 6 Ro1 1 Bottles 5 10 5 1 1 1 1 1 1 1 1 5 2 5 5 1 5 Pair 2 Pair 5 Sets+The silver Zeolite cartridges are in the OSC kit~onl (Kit Attachment A-1 Page 1 of 3 lE).PROCEOURE NUMBER 13.14.4 WP 59S III (9 aII REVISION NUMBER 9 PAGE NUMBER 13.14.4-9 of 91 N
NOTE:    Authorization approval        to exceed guides diFFers under emergency conditions, see EPIP 13.14.1.3        as allowed by Reference  D.
CQMTIRQlLED Il:QPV ITEMS IN WNP-2 FIRE RESPONSE VAN ITEM Turnout Gear Coat Helmet Boots Gloves Scott Air Packs Spare Bottles for SCBA 1 1/2" hose-200 feet 2 1/2" hose-300 feet 1 1/2" Adjustable Fog Nozzles Hydrant Wrench 2 1/2" x 1 1/2" x 1 1/2" Gated Wye 2 1/2" Gate Valve 204 ABC Extinguisher Flashlights Bolt Cutter'UANTITY 5 sets Attachment A-1 Page 2 of 3 PROCEDURE NUMBER 13,14.4 WP 598 R1 (9.83)REVISION NUMBER PAGE NUMBER 13.14.4-10 of 91 t 4, I Locations:
: 1. The admini strati ve      exposure guide for the whole body shall be 300 mrem      er da . This administrative exposure guide should not be exceeded without the prior approval of the Health Physics/Chemistry Manager or designated representative.
INSTRUCTIONS WNP-2 RADIOLOGICAL AND FIRE EMERGENCY CABINET and FIRE RESPONSE VAN Kit lE-Service Building, 441'levation, Operation Support Center (OSC)Kit 2E-441'levation, Radwaste/Reactor Building Corridor Junction Kit 3E-471'levation, Radwaste/Turbine Generator Building Corridor Kit 4E-501'elevation, Radwaste/Turbine Generator Building Corridor at Control Room Door Kit 5E-487'levation, Radwaste Building, outside Chemistry Laboratory Fire Response Van-WNP-2 Protected Area H~onthl (and after nse): 0 Verify spare air bottles full Inspect Scott Air Packs Inspect respirators Verify calibration/expiration dates will not be exceeded prior to next monthly check: o Portable instruments o Iodine tablets (OSC only)o High voltage gloves o Fire extinguishers (Van only)Inventory Contents Perform operational checks o Dosimeters (rezero)o Portable instruments (battery check)o Six-volt battery lanterns/flashlights Check physical condition of cabinet/van contents and replace items as necessary Attachment A-1 Page 3 of 3 PROCEOURE NUMBER 13.14.4 WP.598 R1 (9 83)REVISION NUMBER 9 PAGE NUMBER 13.14.4-11 of 91 f I' ITEMS IN/NEAR WNP-2 OECONTAMINATION KITS ITEM gUANTITY Body Outline Forms Facial Tissue Collodion Cotton Rolls or Balls Cotton Tip Applicators Decon.Detergent Gauze Sponge Procedures Masking Tape Paper Cups Plastic Bags'otassium Permanganate Sample Envelopes Scissor Skin Conditioner Sodium Bisulfite Soft Scrub Brush Nail Brush Surgical Gloves Tongue Oepressor Oisposable Toweling (RN 487'nly)2 Boxes 1 Bottle 2 Boxes 100 1 Bottle 50 1 Set 1 Roll 10 15 Pkgs~20 1 Jar 15 Pkgs.2 10 Pair 10 1 Set Attachment A-2 Page 1 of 2 PROCEDURE NUMBER 13.14.4 WP.SOS Rl (9.at)REVISION NUMBER PAGE NUMBER 13.14.4-12 of 91
: 2. In keeping with the Supply System commitment to ALARA, the normal quarterly exposure guide is 1000 mrem, exposures greater 'than 1000 mrem per quarter will be controlled by the Health Physics/
Chemistry Manager who will ensure reasonable efforts are made to maintain personnel exposure to less than 5 rem per calendar year.
: 3. For the calendar year, the external whole body exposure            guide shall be  5.0      rem. Recommendations    by  the  Health    Physics/Chemistry Manager, concurrence        of the Plant Manager and approval of the Assistant Managing Director For Operations is required to exceed this guide.
(a) Reference  C Attachment  A PROCEDURE NUMBER                   REVISION NUMBER      PAGE NUMBER 13.14.1                                                         13.14.1-5 of   15 WP 598 II1 (9.83)
 
-                                                       10CFR20 LIMITS      (a)
Permissible Ooses, Levels, and Concentrations 20.101 Radiation dose standards            for individuals in restricted areas.
(a)  In accordance with the provisions of                  20.102(a), and except as provided in paragraph (b) of this section,                  no    licensee shall possess, use, or transfer licensed material in such a              manner    as to cause any individual in a restricted      area to receive in any period of one calendar quarter from radioactive materials and other sources of radiation a total occupational dose in excess of the standards specified in the following table:
REMS  Per Calendar Quarter
: 1. Nhole body; head and trunk; active blood forming organs; lens of eyes; or gonads                                                      1 1/4
: 2. Hands and    forearms, feet and ankles                                      18 3/4
: 3. Skin of whole body                                                            7 1/2 (b)   A  licensee may permit an individual in a restricted area to receive a total occupational dose to the whole body greater than that permitted under paragraph (a) of this section, provided:
Ouring any calendar quarter the total occupational dose to the whole body shall not exceed 3 rems; and
: 2. The    dose    to    the    whole body, when added to the accumulated occupational      dose  to the whole body, shall not exceed 5 (N-18) rems where "N" equals the individual's age in years at his last birthday; and
: 3. The  licensee has determined the individuals accumulated occupational dose to the whole body on Form NRC-4 or on a clear and legible record containing all the information required in that form; and has otherwise complied with the requirements of                     20.102. As used in paragraph (b),        "Oose  to  the  whole    body"  shall  be  deemed  to include any  dose    to  the  whole    body,  gonads,    active  blood-forming    organs, head and trunk, or lens of eye.
(25  FR  10914, Nov. 17, 1960, as amended              at 44FR32352,  June 6, 1979)
From    the      "Code      of    Federal      Regulations-Energy-10        Parts    0-199 Rev. Jan 1, 1987.
(a) Reference      A Attachment    8 PROCEDURE NUMBER                  REVISION NUMBER        PAGE NUMBER 13.14.1                                                                   13.14 1-6 of 15 F
wP 598 Rl (983)
 
l~
,"P
+
6~
4, l
 
PROTECTIVE ACTION GUIDE FOR PLUME EXPOSURE PATHMAY      (a)
Projected Nhole          Projected Thyroid Po  ulation at Risk        Bod    Gamma  Dose  rem      Dose  rem General population Emergency workers                    25                      125 Lifesaving activities                75                      (b)
(a) Reference    A (b)  No  specific upper limit is given for thyroid exposure since, in the extreme case, complete thyroid loss might be an acceptable penalty for a life saved.      However, this should not be necessary if respirators and/or thyroid protection for rescue personnel are available.
Attachment  C PROCEDURE NUMBER                REVISION NUMBER      PAGE NUMBER 13.14.1                                                       13.14.1-7 of 15 VilP 598 IIl (9 83)
 
f t,~
  ~
    "'+I
'h pj "ol
 
ADDITIONAL EMERGENCY MORKER PROTECTIVE ACTION GUIOANCE
                                                          .Exposure Level Projected Function                      or Actual Oose/Rate                    Emer enc    Action I ~  Oper  ational  and maintenance    1. 5 rem  whole body.          l. Emergency Operations Procedures actions to    limit accident. 2~    25 rem  thyroid.                  (EOP) and activities associated
: 3. 75 rem  extremities.             with performing the procedures.
: 2. Volume IV), Abnormal Procedures, and activities associated with performing these guidelines.
: 3. Flaintenance        activities          to correct equipment and repair system          under          Emergency Operations        Procedures          and Volume IV, Abnormal Procedures.
II'iquid, air,        and other      1. 5 rem whole body.            1. Collect in-plant airborne and environmental sampling under    2. 25 rem thyroid.                  liquid samples. Use the Post accident conditions.            3. 75 rem extremities.              Accident Sampling System (PASS).
: 2. Oetermine    offsite    dose    rate  and collect environmental        samples.
III. Corrective    or  protective          25 rem whole body.          l. Provide  First aid, ambulance actions.                        2~    125 rem thyroid.                service, fire fighting.
: 3. 375 rem extremities.        2. Any    corrective or emergency action undertaken            to plant systems      and      equipment        For onsite      and    offsite        safety purposes.            Flay        'nclude activation        under        EOP    and Volume IV, Abnormal Procedures.
IV~  l.ifesaving or rescue.          l. 75 rem whole body.          1. Rescue  or removal of injured
: 2. No  limit thyroid.  (a)          personnel    from plant or offsite area.
(a) Thyroid exposure should be minimized to the extent feasible by the use of respiratory protection and/or thyroid prophylaxis. However, no upper limit is specified for life-saving action since complete loss of thyroid Function may be considered an acceptable risk for saving liFt.
Attachment      0 Page  1  of  2 PROCEDURE NUMBER                      REVISION NUMBER    PAGE NUMBER 13.14.1                                                                13.14.1-8 of        15 WP 598 Rt (983I
 
  "\
tj
 
ADDITIONAL EMERGENCY MORXER PROTECTIVE ACTION GUIOANCE                {Continued)
Function                      or Actual Oose/Rate                    Emer enc  Action V. Use  and/or administration of      1. Projected dose rate to       1 ~ Personnel in the Control. Room, Potassium Iodide (KI)   for          the thyroid greater than or      Technical Support Center, emergency workers. Refer to        equa'1 to 250 mrem/hr or          Operations Support Center, Attachment E.                          radioiodine concentration        and Emergency Operations are projected, expected,          Facility self-administer (KI).
or measured to exceed            Potassium Iodide (KI) is 1.4  x 10 7 uci/cc (15 NPC). available in kit located in each of the areas.
: 2. If (KI) is not available, avoid activities in areas with dose projected to be greater than 250 mrem/hr to the thyroid or above 15 MPC.
VI. Habitability    Critical Area(b)
A. Noncritical Functions            l. 50 mrem/hr to whole body. l. At 50 mR/hr whole body    field, evacuate all emergency workers not critical to controlling the accident.(c)
(Based on a 12-hour workday.)
B. Cr itical  Functions          l. 250 mrem/hr  to whole body. l. At 250 mR/hr whole body field, limit time to critical workers to 12 hours or less.          Take other corrective actions as appropriate to reduce exposure levels.
(b) Critical  areas include Control Room, Technical Support Center, and Emergency Operations    Facility.
(c) Evacuation of non'critical personnel to areas with lower exposure levels. Evaluations should be made to ensure that egress dose to the individual does not exceed the dose    if  the individual remained in the area.
Attachment      D Page    2 of  2 PROCEDURE NUMBER                      REVIStON NUMBER      PAGE NUMBER 13.14.1                                                                 13.14.1-9 of      15 IYP 598 B 1 (9 83)
 
pl If C
 
GUIDANCE FOR ADMINISTERING POTASSIUM IODIDE    KI A.  ~Per oee This attachment provides guidelines for recommending administration of potassium, iodide (KI) to all emergency workers both on and offsite as a thyroid-blocking agent to provide protection against airborne radioiodine.
: 8. Location of KI      Su  lies
: 1. Control  Room
: 2. Technical Support Center
: 3. Operations Support Center
: 4. In-plant  Emergency Equipment Cabinets
: 5. Emergency Operations      Facility
: 6. Field  Team  Kits
: 7. Primary Access Point C. Procedure  for Administration
: l. Within the protected area, the Plant Emergency Director, in consul-tation with the Radiation Protection Manager, shall recommend that emergency workers        in the Control Room, Central Alarm Station, Operations Support Center, Technical Support Center, and any other Protected Area location deemed necessary, take KI:
o    When    radioiodine concentrations in  air are known, projected or expected to exceed 1.4 x 10 >        uCi/cc (15 NPC),    if  the projected dose rate to the thyroid      is greater than or equal to 250 mrem/hr, or if the release is    from an unmonitored source known to contain radioiodine.
: 2. The  Radiological      Emergency Manager shall recommend    that  Supply System emergency workers and all Field      Teams  at  locations  outside the Protected Area take KI and make the recommendation            to the Recovery Manager for all other emergency workers:
o    When    radioiodine concentrations in air are known, projected or expected to exceed 1.4 x 10 7 uCi/cc (15 NPC), if the projected dose rate to the thyroid is greater than or equal to 250 mrem/hr, or if the release is from an unmonitored source known to contain radioiodine.
Attachment    E Page  1  of 2 PROCEDURE NUMBER                REVISION NUMBER      PAGE NUMBER 13.14,1                                                      13.14.1-10 of  15 WP 598 Rl I983)
 
GUIDANCE FOR ADMINISTERING POTASSIUM IODIDE        KI  (Continued)
: 3. The    Recovery Manager should        transmit required protective action recommendations to authorities        (State, County and DOE), recommending KI for emergency workers.
: 4. Individuals recommending the use of KI tablets bottle's        should direct personnel to follow the "Directions for Use" on the                    label (copy attached to each bottle).
: 5. As  directed by the Radiation Protection Manager, or the Radiological Emergency      Manager for respective areas, personnel shall use respirators in addition to KI for thyroid protection.
: 6. Personnel    precluded from taking KI due to medical or other reasons shall    inform the    Radiation Protection      Manager  or  Radiological Emergency Manager as    to their situation.
Attachment    E Page 2  of  2 PROCEDURENUMBER              REVISION NUMBER    PAGE NUMBER 13.14.1                                                        13.14.1-11 of  15 WP 598 Rl (983)
 
lt
~ f4 l
  'P
;k k
 
STATE DERIVED INTERVENTION LEVELS        OILs    INGESTION EXPOSURE PATHWAY Preventative Level      a A,    Total Projected    Dose Commitment For One Year      Ingestion++
Whole Body.                          0.5 rem Thyroid                              1.5 rem DERIVED INTERVENTION LEVELS 1-131      Cs-134    Cs-137    Sr-09      Sr-90 B. Deposition  on Ground                61,000+      160,000    72,000    690,000    31,000 (picocuries/square    meter)
C. Deposition  on  Pasture              23,000+      64,000    31,000    260,000    11,000 (picocuries/kilogram)
D. Milk                                    7,000+      12,000      5,800      12,000      550 (picocuries/liter)
E. Water                                11,000+      51,000    25,000      46,000    2,400 (picocuries/liter)
F. Leafy Vegetables                        7,800      12,000      6,000      13,000      580 (picocuries/kilogram)
G. Produce+++                            15,000+        1,100        480  ',900            40 (picocuries/kilogram)
H,    Heat                                  38,000        14,000      7,300      15,000      680 (picocuries/kilogram)
I. Fish                                  12,000        13,000      6,300      13,000      590 (picocuri es/kilogram)
                      +Taken from  the Infant Derived Intervention Levels:          All other values taken from Child Derived Intervention Levels.
                    ++Except contaminated    water ingested for only five days.
                  +++The reason  the produce numbers are low is that they do not include weathering.
Host produce  is harvested when ripe and then stored, during which there is only decay.
(a) Excerpted from State Department of Health          (DOH)  Procedures  (Reference 8)
Attachment    F Page  1  of  2 PROCEOURE NUMBER                  REVISION NUMBER    PAGE NUMBER 13,14,1                                                          13.14.1-12 of    15 W17 598 Al (9 83)
 
ql
~i F
L'
 
STATE DERIVED INTERVENTION LEVELS          OILs    INGESTION EXPOSURE PATHMAY Emer. enc    Level    a A.      Total Projected      Dose Commitment For One Year        Ingestion++
Mhole Body                                5.0 rem Thyroid                                15.0 rem DERIVED INTERVENTI'ON LEVELS I-131        Cs-134      Cs-137    Sr-89    Sr-90 B.      Deposition on Ground                    610,000+      1,600,000    720,000  6,900,000 310,000 (picocuries/square meter)
C.      Deposition    on Pasture                230,000+        640,000    310,000  2,600,000 110,000 (picocuries/kilogram)
D.      Hi 1k                                      70,000+      120,000    58,000    120,000    5,550 (picocuries/liter)
E.      Mater                                  110,000+        510,000    250,000    460,000  24,000 (picocuries/liter)
F.      Leafy Vegetables                          78,000        120,000    60,000    130,000    5,800 (picocuries/kilogram)
G.      Produce+H.                              150,000+          11,000    4,800    39,000      400 (picocuries/kilogram)
H.      Heat                                    380,000          140,000    73,000    150,000    6,800 (picocuries/kilogram)
I.      Fish                                    120,000          130,000    63,000    130,000    5,900 (picocuri es/ki 1ogram)
                      +Taken from the      Infant Derived Intervention Levels:          All other values taken from Child Derived Intervention Levels.
                    ++Except contaminated        water ingested for only five days.
                    +++The reason    the produce numbers are low is that they do not include weathering.
Host produce    is harvested when ripe and then stored, during which there is only decay.
j (a) Excerpted from State        DOH Procedures    (Reference 8)
I Attachment    F Page  2  of 2 PROCEDURENUMBER                    REVISlON NUMBER      PAGE NUMBER 13.14.1                                                                13.14.1-13 of  15 V/P 593 Rl (9 83)
 
STATE RAOIOACTIVITY CONTAMINATION GUIDE        (a)
ALPHA[l]                    BETA-GAMMA[2]
dpm/per 100 cm2                  dpm/per 100 cm2 Emergency            General        Emergency        General Worker              Public          Worker          Publ i c Personnel    [3]                  200                  100            2000            1000 Clothing    and Personal                          200                  100            2200            1000 Equipment Vehicles and l.arge                        2000                  100          5000            2000 Equipment
[1] Nuclear    Wea on  Accident  Res onse  Procedures  Manual, Department of Defense, January 1984.
[2]  Pre aredness and Res onse in Radiation Accidents, Devices and Radiological Health PB 84-104736, August 1983.
Persons  Accidentl    Contaminated with Radionuclides,      1980.
(a)  Excerpted from state Department of Health Procedures                  (ReFerence    8),
however, not included in the base document is the applicability of                this guide to smearable contamination            only.
Attachment  G OCEOURE NUMBER                REVISION NUMBER      PAGE NUMBER 13.14.1                                                          13.14.1-14  oF 15 WP 593 RI (9 83)
 
~ lg
    'I
'iC e
d'f 1
4
 
STATE SURFACE RADIOACTIVITY CONTAMINATION GUIDE +            [dl Areas    and/or items. that have radioactive contaminants exceeding the levels specified in this guide shall be decontaminated, restricted from access and/or use by the public, or removed, packaged, and disposed of as radioactive waste.
This guide also applies to personnel that may become contaminated.
ITEM                      ACTION;LEVEL                          ACTION V
: 1. Personnel                  Less than    100 cpm(b)      Unconditional release.
100-1000 cpm(b)        Decontaminate    if time a 1 1ows;  may  be  re leased without        decontamination if  necessary; Greater than 1000 cpm(b)      Decontamination required.
: 2. Personal Belongings        Less than 1000 cpm(b)        Unconditional use.
                    ,(Except Clothing),
Equipment, Tools,            Greater than 1000 cpm(b)      Decontaminate;    hold  for Vehicles, Other              and/or equal to or            radioactive decay or Materials/items              greater than 1 mR/hr          disposal      as  radioactive I
waste.
: 3. Areas                        (Equal to or    [e])        Uncontrolled access to Less than 1 mR/hr            area. Limited precautions Less than .2 uCi/m2          may be recommended.
(alpha)
Greater than 1 mR/hr          Control access to area (Greater than [e])            until decay to below
                                                  .2 uCi/m2-6 uCi/m~            these levels or (alpha)      decontaminate area.
[a] Above background.
[b] At 1/2 inch, using      a beta-gamma    pancake or thin-end window G-M survey meter;    cpm = counts    per minute as read from the survey meter.
[c]  dpm =  disintegrations    per minute, determined by correcting the cpm observed by the appropriate background, efficiency, and geometric factors for the counting instrument used.
[d]  Excerpted from state Department of Health Procedures (Reference B)
[e]  Not included in base document.
                + The purpose    of this guide is only to indicate      if surface    contamination is about or below the established levels.
Attachment    H ROCEDURE NUMBER                REVISIGN NUMBER      PAGE NUMBER 13.14.1                                                            13.14.1-15 of    15 Wt 598 R1 (983)
 
                                                              %4%HIWQeIIK eI 1I Ie' iiN~ ~
b3  SUPPLY SYSTEM PLANT PROCEDURES MANUAL WNP-2 PROCEDURE NUMBER                APPROV D 13.14.3                                                                          04/28/89 Vol.UME NAME 13            EMERGENCY PLAN IMPL      ENTING PROCEDURES SECTION 13.14        SUPPORTING INFORMATION PROCEDURES SUPPLY SYSTEM HEALTH PHYSICS PROCEDURES, RADIOLOGICAL PROGRAMS 13.14.3      INSTRUCTIONS, AND ENVIRONMENTAL PROGRAMS INSTRUCTIONS 13.14.3.1        ~Pur  ose This procedure provides instructions on the use of Health Physics Proce-dures from the Plant Procedures Manual, the Radiological Programs In-structions Manual, and the Environmental Programs Instruction Manual for emergency activities.            This guidance is divided into three parts, apply-ing to Health Physics Procedures in the Plant, Radiological Program Instructions in .the Emergency Operations Facility, and Environmental Programs      .Instructions.
13.14.3.2        References A. MNP-2      Plant    Procedures    Manual,      Volume            No. 11,  "Health    Physics Procedures" B. Radiological Programs Instruction Manual C. Environmental Programs Instruction Manual 13.14.3.3        Procedure A.      Plant    Emer enc    Activities Action Radiation Protection Manager              1. Utilize the applicable Health                Physics Proce-Health Physics/Chemistry                        dures in Volume No. 11                of the Plant Proce-Personnel                                        dures Manual during emergency situations During a declared emergency, refer to the Special      Instructions and Modifications, Attachment A, for details of. the projected PROCEDURE NUMBER                    REVISION NUMBER    PAGE NUMBER 13.14.3                          5                                                13.14.3-1 of  8 WP.597 R3 {2/88)
 
Res  onsibilit                                        Action Radiation Protection Manager              changes    to  Volume No. 11 of the Plant Health Physics/Chemistry                  Procedures    Manual (normal Health Physics Personnel    (cont'd)                      Procedures)    during emergency activities.
Refer to Attachment B for projected changes of RPI's which may        effect plant Health Physics operations.
Radiation Protection                2. Review and approve changes      to the normal Hanager (RPH)                              practices    specified in the Health Physics Procedures as outlined by Attachment A.
B. Emer enc  0  erations Facilit Activities Res  onsibi lit                                        Action Radiological Emergency              l. Utilize the listing of    procedures  and Manager/HUOAC    Staff (to                instructions in Attachment    B  for guidance include State and                          applicable to the work performed at the Federal Representatives                    Emergency Operations    Facility.
: 2. Take the    'appropriate actions in the listed procedures and instructions        in Attachment B. This is a compilation        of procedures applicable to emergency activities, and the Special Instructions column details modifi-cations to the procedure. This column also provides additional guidance and criteria for use of the procedure.
Radiological Emergency              3. Review and approve changes to Supply System Manager (REM)                              procedures used in the Emergency Operations Facility as authorized by Attachment B.
C. Offsite  Emer enc  Activities Res  onsibi lit                                        Action Radiological Emergency              1. Review the    listing 'of procedures and Manager/Environmental      Field          instructions in Attachment C for guidance
          , Monitoring'eams/                          applicable to the work performed in the Offsite Recovery Teams                    field.
PROCCOURC NUMSSR                RCV SION NUMIIKR    PROD NUMSER 13.14.3                                                            13.14.3-2 of  8 WPiS ~ S Rl {SiSS)
 
Res onsibilit                                      Action Radiological Emergency            2. Take the appropriate actions to perform the Manager/Environmental    Field          ,Field Team/Recovery Team activities.
Monitoring Teams/                        Attachment C is a compilation of the Envi-Offsite Recovery  Teams                ronmental Programs Instructions applicable (cont'd)                                to Emergency Field Team activities. The Specia1    Instructions column of Attachment C provides, details of the modifications to the procedures and additional guidance.
Radiological Emergency            3. Review and approve changes    to Offsite Field Manager                                Monitoring and Recovery      Team  procedures  as outlined by Attachment        C. Approval    of procedures will be a coordinated effort between the Supply System and Washington State  DSHS.
13.14.3.4    Attachments A. Plant    Health    Physics    Procedures    Modifications    for  Emergency Activities
: 8. Radiological Programs      Instructions (RPIs) App'licable for        Emergency Operations    Facility  Emergency  Activities C. Environmental      Programs    Instructions    (EPIs)  and    Health  Physics Procedures Modifications    for Offsite    Emergency Activities PROCKOURK NUMBKR              RKVIKIONNUMBKR    PAOK NUMQKR 13.14.3                                                          13.14.3-3 of  8 WP Sll R'I Ilill)
 
0 HTA 0
0                                              PLANT IIEALTII PHYSICS PAOCFOUAFS MOOIFICATIOHS FOR OHSITE EMERGEHCY m                                                                                                                                ACTIVITIES' 0
C CD m
i PPII P  P              Procedure  Title                                      P  '"                                        ecial Instructions  and  Nodlfications m    11.2.2              AIAAA m
~      m 11.2.2.1            ALARA Procedures  ARP,            Radiation Protection      All                  Objectives of the Supply Systan ALAAA policy are to be maliitalned through              AI, Exposure Accounting,          Manager (RPN)                                    throughout the emergency. Ilowever, the necessity for prompt action 11.2.2.8            etc.                                                                              during the anergency prohibits formal ALARA evaluation and docgnented exposure planning. AIARA activities will be determined by Supply System Emergency Management.
m 11.2.5              PERMISSIBLE EXPOSURE LIMITS        P 0                                                                                                                    \
2 2  11.2.5.1            Personnel  Exposure                Radlatlon Protection      All                  Emergency exposure limits, guides and authorization scheme are In EPIP              .
am',
C                        Limits and Guides                  Manager  (RPN)                                  13. 14. I, "Emergency Exposure Levels/Protective Action Guides . Honaal              +
u CO m                                                                                                                      limits=and guides are reestablished when the recovery phase ls declared.;      .
Q 4'xposure 11.2;5.2            Authorization to Exceed            See EPIP 13.14.1 "Emer-  All:                  See  Authorization      scheme and  levels ln  EPIP 13;14.1 "Emergency Expo:
Mnlnlstrative    Exposure          gency Exposure Levels/                          sure Levels/Protective Action GuidesaP P"
m 0
2 Guides                            PAG's For Limits of"-;
Authorltles.                                                  P P
Q
                                                                                                                                                                                                    ~ "..L-P 3l 11~27        '"    - AREA COHTROL AHD LINITS                                                                          -.- C,                                        'P fA Xl                                                                                                                                                                                            .
P+
11;2.1:I    -'''- Area Postings          -              Radiation Protection      Alert," Site; Area, : Hoimai; Health;Physlci PProcedures        do'not apply. Post  the'ighest Manager (RPN)            General              dose rate reading along with date and time on the door/entrance way
                                                        .!'1.2.1.2                                                to each area entered          lf time permits. Ilonnai area posting will be Entry Into, Conduct In,            Radiation Protection      Alert, Site Area,    reestabllshed at the beglnnlng of the recovery phase.
and Exit Free Controlled Areas Manager (APN)            General              Note: Access control ls to be malntalned for entry Into anergency areas.
g-11.2.7.4            Discrete Radioactive              Radiation Protection      Alert, Site Area,    This procedure may be modified or suspended verbally by the Radiation Particle Control                  Manager (RPM)            General              Protection Manager as necessary but normally will remain in effect.
Cpa I. 11.8              RAOIATIOH WORK PERMIT I
I. I I. 8            Radiation Work Permit              Radiation Protection      Alert, Site  Area,  The  Radiation Wor'k Permits in effect are suspended.          Radiation Work Manager (RPM)            General              Permits will bi. replaced by <<ontlnuous monitoring by Ilcalth Physics Technicians or as directed by the Radiation Protection Manager.
Honnal Radiation Work Permit use will bc rccstablishcd                    for the recovery phase.
i This    attaclvnent is a conyllation of procedures          that are modified during emergencies at the nuclear          facility. All other    applicable llealth Physics Procedures    vill be used in the normal manner.
i i Plant    Procedures    Manual.
 
0                                                                              ATTACIRIEIIT A (contd.)
rl 0
C                                              PLNIT IIEAL)II PIIYSICS PROCEOURES MODIFICATIONS FOR OIISIIE ENFRG FNCY AC I IVITIESP Pl PPM    Ir                                                                                                    S eclal Instructions  and  Modifications GO i
Pl 11.2. 13        RAOIOlOGICAL SURVEYS 11.2. 13.1      Olrect Area Radiation and    Radiation Protection        Alert, Site Area,    Contamination and radiation surveys    will be  made as  directed by the Contamlnatlon Surveys        Manager (RPII)              General              Radiation Protection Manager. Norma) routine area surveys will be discontinued and replaced by surveys requlrcd to support emergency activities.
Pl 11.2. 13.3      Personnel  Decontamination  Radiation Protection        Alert, Site Area,    Illgher contamination levels can be allowed by the Radiation Protection
(                  Survey                      Manager (RPM)              Genera I              Nanager pursuant    to FPIP 13.10.4. Documentation requirements remain ln effect.
0 2
2  11.2.14          REC~EIPT  STO~RAGE ANO C
                        )RANSFER OF RADIOLOGICAL Q
Pl                  MA)ERIAL 11.2. 14.3      Storage  of Radioactive      Radiation Protection        Alert; Site  Area,  Normal storage requirements suspended.      Supply System Radiation Pro-Material                    Manager (RPM)              General              tection Manager and Radiological Emergency Nanager will provide guid-        I ance and requirements.                                                      XI 11.2. 14.8      Transfer of Radioactive      Radiation Protection        Alert, Site Area,    Transfer of radioactive material under normal operating procedures          Q Materials Between            Nanager (RPN)              General                (samples) between the plant and Emergency Operations Faci)ity will be Facilities                                                                    suspended,    Logs oF sarrp)es sent to the Emergency Operations Facility for analyses are to be kept. Transfer betwren the plant and Finer-Pl gency Operations      Faci) I ty wl1) be directed by thc Radiation Protect'ion Manager and the Radiological Emergency Managir.
Q 11.2. 15      CONTANINATION CONIROL 11.2.15.2        Skin Decontamination        Radiation Protection        Alert, Site  Area    Iligher contam'Ination levels can be allowed by the Radiation Protection.
Manager (RPM)              General              Manager pursuant    to EPIP 13. 10.4. Ooclrnentatlon rcqulrrinents remain in effect.
I C4 11.2.15.5        Area Oecontaminat Ion.      Radiation Protection        A)crt, Site Area,    Ccntamlnatlon boundary limits vill remain unchanged. Other allowable Manager (RPN)              General                levels will hc determined by the Radiation Protection Manager, based on thc need for entry into or control of areas.              Norma) Ilralth CP 1                                                                                                    Physics practices will bc used For Recovery activities.
Vl 11.2.15.1        Release of Material Free    Radiation Protection        Alert, Site  Area,  Norma) procedures    wll) bc suspended. Requirements will be estab-Radlologlca))y Contro))ed  Manager (RPN)              General                lished by the Radiatlnn Protection Nanager and Radio)oglcal Finergency Areas                                                                        Nanager.
l  )his attadrnent Is a conyilatlnn oF procedures that are rnodiflcd during emergencies at the nuclear          facility. AI) other  appllcahle Nea)th I'hysics Procrdurrs vill be used in the norma) manner.
 
i edt      0 adp      0                                                                                          ATTACIAIENI B yct 0
RAOIOIOGICAL PAOGlVIIS INSIAUCTIOHS+APis~APPLICABLE FOR DIERGEHCY OPERATIONS FACILITY EIIERGEHCY            ACTIVIIIESt Cpa
              ~acedure'd                Procedure patte                                                                              S eclaI Instructions and IIodifications CI m
4.0              EXTERIUIL DOS IHETAY CcO RPI  4.9        Routine Exchange of              Aadiologlcal Emergency      Site Area,          Normal TI.O badge changeout will be suspendi.d.      Special emergency Personnel TI.D Badges            Hanager (REII) and          General              badge exchanges will be made as necessary.and personnel held out of Radiological Protection                          areas until results have been determined.        Io carply with the emer-Hanager (RPII)                                    gency exposure levels as listed in EPIP 13. 14. I, "Imrgency Exposure
          &#xc3;I levels/Protcctlve Action Guides", the Radiation Protection IIanager m                                                                                                        wili  determine the badges that need to be exchanged in the plant and the Radiological Emergency Hanager will dctenn1ne badges that need to 0                                                                                                        be .exchanged in the Emergency Operations Facility. Normal routine 2
2                                                                                                        exchanges will be reestablishcd when the recovery phase is declared.
C X
RPI 4.11          Processing, Evaluating,          Rad'iolog i ca I Emergency  All                  Hethods of reporting exposures to emergency personnel will be deter-
                                                                                                                                                                                            . A m
and Reporting Extremity          Hanager (REN)                                    mined by the Radiological Emergency Hanager. Homal RPI m'ethods wil Lh Tlgs                                                                              be recstabllshed when the recovery phase is declared.
RPI 4.12          Processing, Evaluating,          Radi ologl ca'I Emergency  Al 'I                Normal  practices will be used for processing and reporting TLO            gg n                    and Reporting Results            Hanager (REN)                                    results. The Radiological Emergency Hanager, in consultation with 2                    of Enviromncntal TIOs                                                              the State  DSIIS,  will determine  the need for recovery  of TLOs  from t C                                                                                                      oFfsite environmental      TLD locations.
Xl  HPD  3.1.2      As Low As Reasonably              Radiological Emergency      All                  aejecttucc op tha supply cyctaa dtltlm pot tcy are to ue matatataed          III~
Achievable (AIARA)    /          Hanager (REII)                                    throughout the emergency. However, the necessity For prompt action gg during the emergency prohibits formal ALAAA evaluation and docancntcd exposure planning. AlARA activities will be determined by Supply Emergency Hanagement.
Q Ql'ystem IIPO  3.1o5    "
Permlsslb'le Exposure            Radiological Emergency      All                  Fsergency exposure limits,    guides and  authoiization scheme are in EAIP I.iml ts                        Hanager (REII)                                    13.14.1, "Emergency Exposure levels/Protective Action Guides". HorsRC exposure llmlts and guides are reestablished        when  the recpvery phase is cdeclared.
Co RPI 12.1          Radiation Work Permit            Radiological Emergency      Alert, Site Area,    1he  Radiation Work Permits in effect are suspended.        Radiation Work Hanager (REII)              General              Permits will be replaced by continuous monitoring by Health Physics Caa                                                                                                            Technicians or as directed by the Radiological Emergency ttanager.
I Cxt                                                                                                            Noreal Radiation Work Perm'it use will be reestabllshcd              for the recovery pltase.
i This attachment      ls  a contpilatlon of procedures    that are modified during emergencies at the nuclear      facility. All other  applicable Ilealth Physics Procedures  will be    used in the normal manner.
pI Plant Procedures      Hanual.
 
Ik D
0                                                                              ATTACIRIENT 6  (cantd.)
~ 0    n m
0 C                              RADIOLOGICAL PROGIIAIIS IINIIIIIC1INIS lIIPlll APPLICIIOIE FOR EMEIIRENCY OPERAYINIS    FACll~ll EIIERGEIICY IICIIIIIYIESI ill c  Proceduce  I        Procedure Tit)e                                                                            5  ecial Instructians  and  Nodiflcatinns X
RPI  I2.29      Posting oF Control Areas    Radiologica) Fmcrgcncy        Alert, Site  Area,    Normal Nealth Physics Procedures do not apply. Post the highest Xl Nanager  (REN)              General              dose rate reading along vith date and time on the door/entrance vay to each area affected    if time permits. Norma) area posting will be RPI 12.30      Fntry Into, Conduct ln,      Radiolog'ical Emergency      Alert, Site Area,    reestablished at the beginning of the recovery phase.
and Exit Fram Controlled    Nanager (AEN)                General              Nate: Access control is to'be maintained for entry into emergency Areas                                                                            areas.
m  RPI 12.33      Decontamination  of  Mark    Radiological Emergency        Alert, Site  Area,    Contam'ination boundary limits uill remain unchanged.      Other allowable Areas                        Nanager (AEN)                General              levels uill be determined by the Radiological Fmergency Nanager, 0                                                                                                    based on the need for entry into or contro) of areas.          Norma) Nealth 2                                                                                                    Physics practices wl)1 be used for Recovery activities.
2 C
X CE API 12.34      Oecan  of Personnel          Radiological Emergency        hlert, Site  Area,    Nigher contamlnatlon levels can bc allowed by the Radio)aglcal ill                                              Nanager (AEN)                General              Emergency    Nanager    pursuant    to EPIP 13.11.1.        OacunentatialC
                                                                                                          - requlrancnts remain in effect.
EE RPI  )2,31      Transfer of Radioactive      Radiological Emergency        A)crt, Site Area,    Transfer of rad'ioactlve mater'lal under normal operating procedures Naterials Oetueen            Nanager (REN)                General              (samp)es) between the plant and Emergency Operations Facility will be Facilities                                                                      suspended. togs of savy)es sent to the Emergency Operations Faci)      lt for analyses are to be kept. Transfer between the plant and Emcr gency Operations      Fac))ity  ulll    be directed    by the Radiatioi Protection Nanager and the Radiological Emergency Nanager.                    I FA RPI 12.39      Release  of Naterlal 'From  Radiolgical Emergency        A)crt, Site Area,    Normal procedures wil) be suspended.        Requirements ui)l he estab-Radio)oglcal)y Controlled    Nanager (RFN)                General              lished by the Radiation Protection Nanager and Radiological Emergency Areas                                                                            Nanager.
A RPI  12.40. Radiation/Contamination      Radiological Emergency        A)crt, Site Area,    Contamination and radiation surveys vl) I be made as directed by the        C Surveys                      Nanager (REN)                Genera)              Radiological Emergency Nanager. Norma) routine area surveys          vill  he@
discontinued and replaced by surveys required to support ancrgen~
activities.
G Col RPI 12.53      Personnel Contamination      Radiological Finergcncy      Alert, Site Area,    Nigher contamlnatlon 1cvels can be a)lowed by the Radio)oglcal Survey                      Nanager (REN)                General              Emergency    Nanager    pursuant    to EPIP 13. 11.1.        Dnclvtsentat)on ca                                                                                                      requirements remain ln effect.
I RPI 12.51      Storage of Radioactive      Radio)ogical Emergency        A)crt, Site Area,    Norma) starage  rcqulrancnts suspended. Supply Systan Radiation Pro-O                      Nater)al                    Nanager (RFA)                General              tection  Nanagcr and Radlologlca) Emergency Nanager will provide guid-ance and requirements.
ln thc  norma) manner.
 
  'I "r
 
                                ~        ~                              I  I        I  '    I I      ~  ~ I
                                    ~            ~
I    ~    ~  I                                                                                                          ~      I    I                  I I ~                                                                                                          I    ~                                  I          '                  I                    ~    ~  ~
              ~          ~          ~          ~                                                                                                                                                    I    ~
                                                                                                                                    ~            ~                                                                        I    .    ~
                                                        ~    I          ~    ~        I                        ~
                                                                                                                    '                I      ~ \      ~      I  ',                ~          ~  ~    ~    '                            ~
I    .  ~
I'                                      I    \                I                                                                I          ~    ~
I  ~                                                                                                                                              I    .    ~
I    I  ~                                              I  I  I~        .      I                      ~          .    ~    I          I          \
                                                    ~ ~                                                                                                                                                                ~    '
                                                                                                                                          ~    I      I
                                  ~            I                      I  ~    ~  I                            \    '                                ~ ~            ~      .    ~                          ~  ~              ~  I
                    ~  '              ~                                  ~    ~                                ~      ~                            I~  ~                                                                        I  ~
I                              I                        I    ~                                          I        ~ ~      '    ~ ~            ~
                                                                                                                                                    ~      ~      . ~      ~
I  ~    ~ ~                                                    I~                                    ~      I      ~
                                                                                                                                                                                                                                ~            '      ~
                                                                                                                  ~    ~
I        .      I                                          ~  '
                                                                                                                                                                                          ~                                              ~    ~  ~  ~ I I
~~                                                                                                              I    I,        I
~4
                  ~  I'                                                            ~      ~
I 'I '
                  <<          ~    ~    ~  \.        II
                                              ~    ~    \    ~ ~ I '
                                                                                                  ~ I I I I '
I ~
 
pf II4%HIWrellI ~4 elle ell'e ~ e 4J  SUPPLY SYSTEIVI PLANT PROCEDURES MANUAL WNP.2 PROCEDURE NUMBER 13.14.4 VOLUME NAME Apeeoveo g~~                                DATE 03/22/90 13          EMERGENCY PLAN IMPLEMENTING PROCEDURES SECTION 13.14        SUPPORTING INFORMATION PROCEDURES TITLE 13.14.4      EMERGENCY EQUIPMENT 13.14.4.1        ~Per ose This    procedure    describes    requirements For inspection, inventory, and functional      testing    oF  emergency equipment and supplies which are not maintained under other approved procedures.                                Quantities distinguish between items that are required, which must be present; and items that are desired, which may be present to enhance emergency operations.
13.14.4.2        References A. EPIP  13.14.9, Emergency Program Maintenance B. NUREG  0654 13.14.4 '        Procedure Res  onsibi  lit                                                Action Supervisor, Health Physics,              l. Ensure  that the following cabinets are tt1lNP-2                                      checked    in accordance with the instructions outlined in Attachment A, "NNP-2 Emergency Equipment".
Radiolo ical and Fire Emer enc                  Cabinets Locations:
o      Kit lE              Service Building, Operations    Support 441'levation, Center (OSC).
o        Kit      2E    - 441'levation,      Radwaste Reactor Building Corridor Junction.
PROCEDURE NUMBER                    REVISION NUMBER    PAGE NUMBER 13.14.4                                                                          13.14.4-1 of  91 WP 587 R3 (2/88)
 
I+)
k T
    "qa
 
Res  onsibi lit                                    Action Supervisor Health Physics,                  o    Kit  3E  - 471'levation,      Radwaste/
WNP-2 (Cont.)                                    Turbine Generator      Building Corri-dor.
o    Kit 4E      501'levation,    Radwaste/
Turbine Generator Building Corri-dor at Control Room door.
o    Kit  5E    487'levation,      Radwaste Building        outside      Chemistry Laboratory.
Decontamination    Kits:
Locations:
o    Kit    10    -  Service    Building, 441'levation,      Access  Control.
o    Kit  2D  -  Radwaste  Building, Locker, 487'levation,=Decontamination Men's Locker Room.
o    Kit  30      Radwaste  Building, Decontamination Locker, 487'levation, Women's Locker Room.
First  Aid Kits:
Location:
o    Kit 1FA - 441', Service Building, First Aid Room.
Kit  2FA    487'levation,    Radwaste Building, Health Physics Office.
Kit  1FB    441'levation,      Service Building,        Operations      Support Center (OSC) o    Kit  2FB      441'levation,      Rad'-
waste/Reactor      Building  Corridor Junction.
o    Kit  3FB    - 471'levation,        .Rad-waste/Turbine      Generator  Building Corridor.
~
* PROCEDURE NUMBER                  REVISION NUMBER  PAGE NUMBER 13.14.4                      9                                  13.14.4-2 of  91 WP 508 Al (9.83)
 
~k pt
 
CQMmQLLEG CQPY Res onsibi lit                                      Action Supervisor Health Physics,                    o    Kit 4FB - 501'levation,        Radwaste WNP-2 (Cont.)                                        /Turbine Generator Building Corr-idor at Control Room Door.
o    Kit  5FB  - 4B7'levation,      Radwaste Building outside Chemistry Labor-atory.
                                                        ~
Emer enc    Protection Kits:
Location:
o    Kit  EPK  Technical    Support Center
: 2. Completed    record  forms are  to  be  forwarded to the Manager,    Emergency Planning.
Shift  Manager.                  3. Ensure  that the following alarm        systems  are demonstrated      in accordance        with the instructions      outlined in Attachment A, "WNP-2 Emergency    Equipment."
Plant Exclusive    Use Si  nals:
Location:    Control  Room o    Alerting    Tone o    Immediate Evacuation Alarm
: 4. Complete record forms and forward them to the Hanager, Emergency Planning.
Supervisor, Radiological          5. Ensure  the following are checked in Accor-Services                                dance  with the instructions outlined in Attachment B, "Emergency Operation        Facility, Emergency Equipment".
Field Monitorin Kits:
Location:
o    Plant      Support    Facility      and Headquarters PROCEDURE NUMBEA                  REVISION NUMBER    PAGE NUMBER 13.14.4                      9                                    13,14.4-3 of    91 WP.598 AI (9 83)
 
4l E1 1j 1
 
CQNIQLLED CQPY Res onsibi lit                                      Action Supervisor, Radiological                Oecon  Stora  e Trailer:
Services (Cont.)
Location:
o      Plant Support    Facility River Evacuation Kits:
Location:
o      Headquarters Aerial Monitorin Kit:
Location:
o      Headquarters E  ui ment for  PASS:
Location:
o      Ambulance Bay o      Counting  Room o      Chemistry Lab
: 6. All completed record        forms are  to be  for-warded  to the Manager,    Emergency Planning.
Supervisor, Communications        7. Ensure  that the Communications Systems are Services                                checked    in accordance with the instructions outlined in Attachment E, "Communications System".
: 8. Completed    record  forms are to be forwarded to the Manager,    Emergency Planning.
PROCEDURE NUMBER                  REVISION NUMBER    PAGE NUMBER 13.14.4                      9                                    13.14.4-4 of 91 WP 59$ RI (0 83)
 
1 gg
    ,4
 
Res  onsibi lit                                      Action Assigned Personnel                9. Ensure the following emergency centers are (As Listed Below)                        checked in accordance with the instructions outlined in Attachment G, "Emergency Center Equipment and Supplies".        Completed record forms are to be      forwarded  to the Hanager, Emergency  Planning.
Manager, WNP-2 Operations                o    Control  Room Manager, WNP-2    Administration        o    Technical Support Center o    Operations Support Center o    Alternate Operations Support Center Manager, WNP-2 Modifications 8          o    Supply System Decision Center Upgrades (Site Support Manager)
Hanager,  Security Programs            o    Security Decision Center o    EOF  Communications  Center o    H(} Communications  Center Senior Specialist, State Liaison        o    Offsite  Agency Coordination Center (Offsite Agency Coordinator)
Manager,  Generation Engineering        o    Technical Data Center Manager,  Records Management            o    EOF  Records Rooms Manager Radiological Programs            o    Meteorology and Unified Dose and Instrument Calibration                    Assessment Center (Radiological Emergency Manager)
Senior Media Coordinator                o    Media  Briefing Preparation  Area (EOF Public Information Officer)
Manager,  Emergency Planning            o    NRC  Work Area Manager,  Facilities Services          o    Crisis  Management  Center (Hg  Administrative Support Supervisor)
Director, Administration 5              o    Joint Information Center Information Services (Joint Information Center Director)
PROCEDURE NUMBER                  REVISiON NUMBER    PAGE NUMBER 13,14.4                                                        13.14.4-5 of  91 WP.598 R1 (9 83)
 
~ I J t
  ~r t,
I;
'it
 
Res  onsibi 1 it                                        Action Hanager,  Health and Sciences      10. Ensure    that    the    Emergency      Operations Facility  Medical Equipment and supplies are checked in accordance with Attachment F, "EOF    Emergency      Medical    Equipment      and Supplies".
ll. Completed record Forms are to be forwarded to the Manager, Emergency Planning.
Manager,  Emergency Planning      12. Ensure the following cabinets are checked in accordance with the instructions out-lined in Attachment      C,  "Hospital Radiolog-ical  Emergency    Kits".
Hos  ital  Radiolo ical    Emer  enc    Kits Locations:
o    Kadlec Hospital,      Emergency    Room .
Storage Cabinet o    Kennewick    Hospital,  Emergency Room Storage Closet o    Our Lady    of Lourdes,    Decon Shower Room o    Yakima    Valley Memorial,      Autopsy Room
: 13. Ensure the Emergency Telephone Directory is maintained in accordance with the instruc-tions outlined in Attachment 0, "Emergency Planner Communications System Tests".
: 14. Ensure the dedicated telephone lines are checked in accordance with the instructions outlined    in Attachment        0,    "Emergency Planner Communications System Tests".
: 15. Monitor compliance with this procedure's
                                                        . requirements, take action to insure dis-crepancies    are    corrected,      and  maintain auditable records oF performance of all required checks.
PROCEDURE NUMBER                  REVISION NUMBER    PAGE NUMBER 13.14.4                                                              13.14.4-6 of    91 WP 598 RI I983)
 
lP
<P 4g
 
Action Manager,  Emergency Planning        16. Ensure signs are checked in accordance with (Cont.)                                      the instructions of Attachment J, "Off-site Emergency Signs".
HPC  Coordinator                      17. Ensure that the HVAC is checked in accor-dance with instructions outlined in Attach-ment K, "Ventilation Radiation Monitoring".
: 18. Complete    record  forms    are to be forwarded to the Manager,    Emergency Planning.
Supervisor, Facility                  19 'nsure      that the  HVAC  and    diesel generators Maintenance                                  are tested    in accordance    with instructions outlined in Attachment L, "Facility Systems Tests".
: 20. Completed    record  forms are to be forwarded to the Manager,    Emergency Planning.
13.14.4.4    Attachments A. WNP-2 Emergency      Equipment B. EOF/Headquarters      Emergency Equipment C. Hospital Radiological Emergency Kits
: 0. Emergency Planner Communications          System Tests Communications System Tests F. EOF Medical Equipment and Supplies G. Emergency Center Equipment and Supplies H. Sign-In Sheet Sign-Out Sheet Off-Site  Emergency Signs K. Ventilation Radiation Monitoring L. Fac'ilities  Systems  Tests PROCEOURE NUMBER                  REVISION NUMBER        PAGE NUMBER 13.14.4                      9                                        13.14.4-7 of 91 WP 59B Rl (983)
 
WNP-2 EMERGENCY    E  UIPMENT A-1 WNP-2    Radiological    and  Fire  Emergency Cabinet and  Fire Response    Van A-2 WNP-2    Oecontamination Kits A-3 WNP-2    First  Aid  Kit,  Type A A-4 WNP-2    First  Aid  Kit,  Type 8 A-5 WNP-2 Emergency      Protective Equipment Kit    (TSC)
A-6 Plant Exclusive      Use  Signals Attachment Section      A of e
Page  1    1 PROCEDURE NUMBER              REVISION NUMBER      PAGE NUMBER 13.14..4                      9                                  13.14.4-8 of 91 WP 598 RI I9 aI)
 
I V
*k',
 
ITEMS IN/NEAR WNP-2 RAOIOLOGICAL ANO FIRE EMERGENCY CABINET QUANTITY Ai r  Purifying Respirator                          5 Respirator Filter                                  10 Battery, 6 Volt Lantern                              5 Battery, 0 Cell                                      1 Bolt Cutter                                          1 Chain Wrench                                        1 Sledge                                              1 Fire  Axe                                          1 Pinch Bar                                            1 Hacksaw Frame/Blade                                  1 Pocket Knife                                        1 Fire  Hose Wrench                                  5 Pipe Wrench                                          2 6 Volt Lantern                                      5 Safety Belt                                          5 Nylon Rope, 100 Feet                                1 Leather Gloves                                      5 Pair High Voltage Gloves 8 Leather Covers                2 Pair Fireman Turnout Gear                                5 Sets Boots Coats Hood G.loves
                                -  Helmet/Shi el d Scott Air Pak                                        5 Scott Spare Bottles                                  5 Protective Clothing                                  5 Sets Covera 1 1 s Rubber Boots Plastic Booties Glove Liners Rubber Gloves Hood/Cap Survey Instrument, Oose Rate Survey Instrument, Count Rate (GM Pancake Probe)
Masking Tape                                        1 Ro1 1 Pocket Oosimeters, 200 R                            5 Oosimeter'harger                                    1 Iodine Tablets    (~OSC  onl  )                    28 Bottles Silver Zeolite Cartridge (Iodine        Sampling)    6
                  + The silver Zeolite cartridges      are in the    OSC kit ~onl (Kit lE) .
Attachment A-1 Page  1  of  3 PROCEOURE NUMBER                REVISION NUMBER      PAGE NUMBER 13.14.4                    9                                    13.14.4-9 of 91 WP 59S III (9 aII
 
N CQMTIRQlLED Il:QPV ITEMS IN WNP-2 FIRE RESPONSE    VAN ITEM                                        'UANTITY Turnout Gear                                    5  sets Coat Helmet Boots Gloves Scott Air Packs Spare    Bottles for    SCBA 1  1/2" hose    - 200  feet 2  1/2" hose    - 300  feet 1  1/2" Adjustable      Fog Nozzles Hydrant Wrench 2  1/2"  x  1 1/2"  x  1  1/2" Gated Wye 2  1/2" Gate Valve 204    ABC  Extinguisher Flashlights Bolt Cutter Attachment A-1 Page  2 of 3 PROCEDURE NUMBER          REVISION NUMBER      PAGE NUMBER 13,14.4                                                    13.14.4-10 of 91 WP 598 R1 (9.83)
 
t 4,
I
 
INSTRUCTIONS WNP-2 RADIOLOGICAL AND FIRE EMERGENCY CABINET and FIRE RESPONSE VAN Locations:
Kit  lE -    Service    Building,      441'levation,    Operation  Support Center  (OSC)
Kit  2E  - 441'levation,          Radwaste/Reactor    Building Corridor Junction Kit 3E - 471'levation,              Radwaste/Turbine    Generator  Building Corridor Kit 4E -      501' elevation, Radwaste/Turbine          Generator  Building Corridor at Control Room Door Kit  5E  - 487'levation,          Radwaste  Building, outside Chemistry Laboratory Fire    Response  Van  -  WNP-2  Protected Area H~onthl (and  after nse):
Verify spare air bottles full 0    Inspect Scott Air Packs Inspect respirators Verify calibration/expiration dates will not              be exceeded    prior to next monthly check:
o      Portable instruments o      Iodine tablets (OSC only) o      High voltage gloves o      Fire extinguishers (Van only)
Inventory Contents Perform operational checks o      Dosimeters  (rezero) o      Portable instruments (battery check) o      Six-volt battery lanterns/flashlights Check    physical  condition of cabinet/van        contents  and  replace items as necessary Attachment A-1 Page  3 of  3 PROCEOURE NUMBER              REVISION NUMBER      PAGE NUMBER 13.14.4                      9                                      13.14.4-11 of  91 WP.598 R1 (9 83)
 
f I'
 
ITEMS IN/NEAR WNP-2 OECONTAMINATION KITS ITEM                        gUANTITY Body  Outline Forms Facial Tissue                    2  Boxes Collodion                        1  Bottle Cotton Rolls or Balls            2  Boxes Cotton Tip Applicators              100 Decon. Detergent                  1  Bottle Gauze Sponge                          50 Procedures                        1  Set Masking Tape                      1  Roll Paper Cups Plastic  Bags                        10 Permanganate
                                                'otassium 15 Pkgs  ~
Sample Envelopes                      20 Scissor Skin Conditioner                  1  Jar Sodium  Bisulfite                15 Pkgs.
Soft Scrub Brush                      2 Nail Brush Surgical Gloves                  10  Pair Tongue Oepressor                      10 Oisposable Toweling                1  Set (RN 487'nly)
Attachment A-2 Page      1 of 2 PROCEDURE NUMBER        REVISION NUMBER      PAGE NUMBER 13.14.4                                                      13.14.4-12 of 91 WP.SOS Rl (9.at)


INSTRUCTIONS WNP-2 OECONTAMINATION KITS Locations:
INSTRUCTIONS WNP-2 OECONTAMINATION KITS Locations:
o Kit 10-Service Building, 441'levation, Access Control o Kit 20-Radwaste Building, 487'levation, Men's Locker Room o Kit'0-Radwaste Building, 487'levation, Women's Locker Room~uarter1 (aad after uae): o Inventory contents o Verify expi,ration dates on chemicals will not be exceeded prior to next quarterly check o Check physical condition of cabinet contents and replace items as necessary o Insert changes in procedure book and update all forms Attachment A-2 Page 2 of 2 PROCEDURENUMBER 13.14.4 REVISION NUMBER PAGE NUMBER 13.14.4-13 of 91 WP.598 R1 (9.83) 1%1 CW f, ill Lt".QNTIRQLlEO CQPY ITEMS IN/NEAR WNP-2 FIRST AID KIT-TYPE A ITEM gUANTITY Multi-trauma Dressings Adhesive Bandages Compresses (4")Eye Pads Extraction Scissor Tweezer Triangular Bandages Antiseptic Pad-Alcohol Penl i ght Adhesive Tape Kling Dressing Surgipads Burnsheets Disposable Blankets Instant Glucose (Tube)Eye Irrigation Solution Normal Saline (500cc)Disposable Splints (assorted)
o   Kit   10   - Service Building, 441'levation,       Access Control o   Kit   20   Radwaste Building, 487'levation,       Men's Locker Room o   Kit'0 Radwaste       Building, 487'levation,       Women's Locker   Room
Surgical Gloves 4" x 4" (Bulk)Disposable Ice Packs Paper, Pad Ball-Point Pen Cervical Collar 32 10 6 1 1 10 10 1 2 6 4 2 2 1 1 1 2 Pair 1 Pkg.4 Attachment A-3 Page 1 of 2 PROCEDURE NUMBER 13.14.4~REVISION NUMBER 9.PAGE NUMBER 13.14.4-14 of 91 WP 598 Rl (9 83)
                  ~uarter1   (aad   after uae):
I'~, I I INSTRUCTIONS WNP-2 FIRST AIO KIT-TYPE A Locations:
o   Inventory contents o   Verify expi,ration dates         on chemicals will not be exceeded   prior to next quarterly check o   Check physical       condition of cabinet contents     and replace items as necessary o     Insert changes   in procedure   book and update   all forms Attachment A-2 Page   2 of 2 PROCEDURENUMBER               REVISION NUMBER      PAGE NUMBER 13.14.4                                                           13.14.4-13 of   91 WP.598 R1 (9.83)
o Kit 1FA-First Aid Room Service Building, 441'levation o Kit 2FA-Rad Waste Control Room~uarter 1 (and aFter uae): o Inventory contents o Check physical condition of contents and replace items as necessary Vl o Perform operational check on penlight o Verify expiration date of solutions'will not be exceeded prior to next quarterly check Attachment A-3 Page 2 of 2 PROCEDURE NUMBER 13.14.4 WP 59$Rl (9')REVISION NUMBER 9 PAGE NUMBER 13.14.4-15 of 91 "K
 
ITEMS IN/NEAR WNP-2 FIRST AID KIT-TYPE B TRAUMA KIT gUANTITY Extraction Scissor Penlight Trauma Dressing Surgical Gloves Adhesive Tape Kling Bandage Triangular Bandage Cold Packs 4" x 4" Bandage Stretcher Wool Blankets Oxygen Bottle (with kit)Gauze, 4.5" x 147" Blood Pressure Kit Steth-o-scope Saline Solution Burn Sheet Instant Glucose 5 pair 2 rolls 8 12 2 5 1 2 1 1 bottle 1 tube Attachment A-4 Page 1 of 2 PROCEDURE NUMBER 13.14.4 wP 598A1Is83)
1 %1 CW f, ill
REVISION NUMBER 9 PAGE NUMBER 13.14.4-16 of 91 i t P~
 
CQMTIRQllED CQP'f INSTRUCTIONS WNP-2 FIRST AID KIT-TYPE B TRAUMA Locations:
Lt".QNTIRQLlEO CQPY ITEMS IN/NEAR WNP-2 FIRST AID     KIT TYPE A ITEM                       gUANTITY Multi-trauma Dressings Adhesive Bandages                   32 Compresses   (4")                 10 Eye Pads                             6 Extraction Scissor                   1 Tweezer                               1 Triangular   Bandages             10 Antiseptic   Pad Alcohol         10 Penl i ght                           1 Adhesive Tape                         2 Kling Dressing                       6 Surgipads                             4 Burnsheets                           2 Disposable Blankets                   2 Instant Glucose (Tube)               1 Eye   Irrigation Solution             1 Normal   Saline (500cc)               1 Disposable Splints (assorted)
o Kit 1FB-Service Building, 441'levation, Operations Support Center (OSC)o Kit 2FB-441'levation, Radwaste/Reactor Building Corridor Junction o Kit 3FB-471'levation, Radwaste/Turbine Generator Building Corridor o Kit 4FB-501'levation, Radwaste/Turbine Generator Building Corridor at Control Room Ooor o'it SFB-487'levation, Radwaste Building Outside Chemistry Laboratory
Surgical Gloves                       2 Pair 4" x 4" (Bulk)                       1 Pkg.
~uarterl (aed after uae): o Inventory contents o Check physical condition of contents and replace items as necessary o Verify oxygen bottle is'ull o Perform operational check on penlights Attachment A-4-Page 2 of 2 PROCEDURE NUMBER 13.14.4 WP 598 R1 (0 83)REVISION NUMBER PAGE NUMBER 13.14.4-17 of 91 It:QNTIRQu.EO CQPV ITEHS IN/NEAR WNP-2 EMERGENCY PROTECTIVE E UIPHENT KIT (TSC)ITEM gUANTITY Protective Clothing-Coveralls-Hoods/caps
Disposable Ice Packs                 4 Paper,   Pad Ball-Point Pen Cervical Collar Attachment A-3 Page 1 of 2 PROCEDURE NUMBER        ~ REVISION NUMBER      PAGE NUMBER 13.14.4                 9.                                   13.14.4-14 of 91 WP 598 Rl (9 83)
-Plastic Booties-Rubber Boots-Rubber Gloves-Glove Liners Respirators (particulate)
 
Combination Filters (respi rator)Pocket Dosimeters Dosimeter Charger Dose Rate Instruments Potassium Iodine Tablets Duct Tape Hasking Tape 25 sets 25 50 25 25 sets 1 roll 1 roll PROCEDURE NUMBER 13.14.4 WP 59B R1 (9 83)REVISION NUMBER 9-Attachment A-5 Page 1 of 2 PAGE NUMBER 13.14.4-18 of 91 I
I '~,   I I
INSTRUCT IONS MNP-2 EMERGENCY PROTECTIVE E UIPMENT KIT (TSC)Location: o Technical Support Center~nnnthl (and after use): Inspect respirators Verify calibration/expiration dates will not be exceeded prior to next monthly check: o'ortable instruments o Potassium iodide tablets Inventory Contents Perform operational checks o Oosimeters (rezero)o Portable instruments (battery check)Check physical conditiop of cabinet contents and replace items as necessary Attachment A-5 Page 2 of 2'PROCEDURE NUMBER 13.14.4 WP 598 Rl (9 83)REVISION NUMBER PAGE NUMBER 13.14.4-19 of 91 g Il tl:QMTIRQU.EGI CQPY PLANT EXCLUSIVE USE SIGNALS Location:.Control Room The following demonstrations should be immediately preceded at least by voice announcement over the public address system.Oemonstrations should be conducted on all shifts on the First Monday of each month, at approximate times as follows: Oay Shift-1300 Swing Shift-1700 Hid Shift-0200 The following public address format should be adhered to: o."This is a demonstration of the ALERTING TONE.This is a demonstration of the ALERTING TONE." o Sound the ALERTING TONE (pulsed tone-constant level)for 5-10 seconds.o"This concludes the demonstration oF the ALERTING TONE." B.Immediate Evacuation Alarm: o"This is a demonstration of the Immediate Evacuation Alarm for the protected area.This is a demonstration of the IHHEOIATE EVACUATION ALARH for the protected area.This is only a demonstration, 00 NOT RESPONO!00 NOT RESPOND!" o Sound the protected area IHHEOIATE EVACUATION ALARM (wailing siren)for 5-10 seconds.o"This concludes the demonstration of the protected area IHHEOIATE EVACUATION ALARH." o"This concludes all signal demonstrations, regard all further signals as real."~Mnnthl Perform operational check.Attachment A-6 Page 1 of 1 PROCEDURE NUMBER 13.14.4 WP SM Rl (9.83)REVISION NUMBER 9 PAGE NUMBER 13.14.4-20 of 91  
 
INSTRUCTIONS WNP-2 FIRST AIO   KIT   TYPE A Locations:
o   Kit 1FA     First Aid   Room Service Building, 441'levation o   Kit   2FA Rad Waste     Control Room
                ~uarter 1 (and aFter uae):
o   Inventory contents o   Check     physical   condition     of contents   and   replace items   as necessary Vl o   Perform operational check on penlight o   Verify expiration date of solutions 'will not         be exceeded   prior to next quarterly check Attachment A-3 Page 2 of 2 PROCEDURE NUMBER            REVISION NUMBER      PAGE NUMBER 13.14.4                     9                                   13.14.4-15 of 91 WP 59$ Rl (9')
 
"K ITEMS IN/NEAR WNP-2 FIRST AID       KIT TYPE B TRAUMA KIT gUANTITY Extraction Scissor Penlight Trauma Dressing Surgical Gloves                     5 pair Adhesive Tape                       2 rolls Kling Bandage                       8 Triangular Bandage                 12 Cold Packs                           2 4" x 4" Bandage                     5 Stretcher                           1 Wool Blankets                       2 Oxygen   Bottle (with   kit)
Gauze,   4.5" x 147" Blood Pressure     Kit Steth-o-scope                       1 Saline Solution                     1 bottle Burn Sheet Instant Glucose                     1 tube Attachment A-4 Page 1 of 2 PROCEDURE NUMBER    REVISION NUMBER        PAGE NUMBER 13.14.4               9                                   13.14.4-16 of 91 wP 598A1Is83)
 
i t
P ~
 
CQMTIRQllED CQP'f INSTRUCTIONS WNP-2 FIRST AID     KIT TYPE B   TRAUMA Locations:
o   Kit 1FB   - Service Building, 441'levation,         Operations   Support Center (OSC) o   Kit 2FB   - 441'levation,         Radwaste/Reactor   Building Corridor Junction o   Kit 3FB   - 471'levation,         Radwaste/Turbine   Generator   Building Corridor o   Kit 4FB     501'levation,         Radwaste/Turbine   Generator   Building Corridor at Control Room Ooor o 'it     SFB   487'levation, Laboratory Radwaste   Building Outside Chemistry
                  ~uarterl   (aed   after uae):
o   Inventory contents o   Check     physical   condition     of contents   and   replace items   as necessary o   Verify   oxygen bottle   is'ull o   Perform operational check on penlights Attachment A-4
                                                    -Page 2 of 2 PROCEDURE NUMBER             REVISION NUMBER      PAGE NUMBER 13.14.4                                                           13.14.4-17 of   91 WP 598 R1 (0 83)
 
It:QNTIRQu.EO CQPV ITEHS IN/NEAR WNP-2 EMERGENCY PROTECTIVE         E UIPHENT KIT (TSC)
ITEM                       gUANTITY Protective Clothing                 25 sets
                                - Coveralls Hoods/caps Plastic Booties Rubber   Boots
                                - Rubber Gloves
                                - Glove Liners Respirators   (particulate)       25 Combination Filters                 50 (respi rator)
Pocket Dosimeters                   25 Dosimeter Charger Dose Rate Instruments Potassium Iodine Tablets           25 sets Duct Tape                           1 roll Hasking Tape                         1 roll Attachment A-5 Page  1 of 2 PROCEDURE NUMBER        REVISION NUMBER      PAGE NUMBER 13.14.4                 9-                                  13.14.4-18 of 91 WP 59B R1 (9 83)
 
I INSTRUCT IONS MNP-2 EMERGENCY PROTECTIVE         E UIPMENT KIT (TSC)
Location:
o   Technical Support Center
                  ~nnnthl (and   after use):
Inspect respirators Verify calibration/expiration dates will not               be exceeded   prior to next monthly check:
o     'ortable     instruments o       Potassium iodide     tablets Inventory Contents Perform operational checks o       Oosimeters   (rezero) o       Portable instruments (battery check)
Check physical       conditiop of cabinet contents       and replace items as necessary Attachment A-5 Page   2 of 2
'PROCEDURE NUMBER             REVISION NUMBER      PAGE NUMBER 13.14.4                                                             13.14.4-19 of   91 WP 598 Rl (9 83)
 
g Il
 
tl:QMTIRQU.EGI CQPY PLANT EXCLUSIVE USE SIGNALS Location: .Control       Room The following demonstrations             should be immediately preceded at least by voice announcement         over the public address system.
Oemonstrations should be conducted on all shifts on the                     First Monday of each month, at approximate times as follows:
Oay   Shift       1300 Swing Shift       1700 Hid Shift         0200 The following public address format should                 be adhered   to:
o .   "This is a demonstration of the ALERTING               TONE. This is   a demonstration of the ALERTING TONE."
o       Sound   the   ALERTING TONE       (pulsed tone-constant     level) for 5-10 seconds.
o       "This concludes the demonstration             oF the ALERTING TONE."
B. Immediate Evacuation Alarm:
o       "This is     a demonstration       of the Immediate Evacuation Alarm for the protected area.               This is a demonstration of the IHHEOIATE EVACUATION           ALARH for the protected area.           This is only     a demonstration,       00 NOT RESPONO!   00 NOT RESPOND!"
o       Sound     the   protected       area   IHHEOIATE   EVACUATION     ALARM (wailing siren) for 5-10 seconds.
o       "This concludes         the demonstration       of the protected       area IHHEOIATE EVACUATION ALARH."
o       "This     concludes     all signal       demonstrations,     regard   all further signals       as   real."
                  ~Mnnthl Perform operational check.
Attachment A-6 Page   1 of 1 PROCEDURE NUMBER              REVISION NUMBER        PAGE NUMBER 13.14.4                         9                                         13.14.4-20 of   91 WP SM Rl (9.83)
 
EMERGENCY OPERATIONS        FACILITY/HEAD UARTERS EMERGENCY E UIPMENT 8-1  Field Sampling Kit 8-2  Protective Clothing Kit 8-3  Air Sampling Kit 8-4  Instrumentation Kit 8-5  Multichannel Analyzer Kit 8-6  Oecon    Cabinet 8-7  Extra Protective Clothing 8-8  Field    Lab  Supplies 8-9  Portable Generator Set 8-10 River Evacuation Monitoring Kit B-ll River Evacuation      Oecontamination    Kit 8-12 Aerial Monitoring Kit 8-13 Oecon    Storage  Trailer 8-14 Equipment    for  PASS Attachment Section    8 Page 1  of 1 PROCEDURE NUMBER              REVISION NUMBER      PAGE NUMBER 13.14.4                    9                                  13.14.4-21 of 91 WP 598 II1 (9 aI)
 
t>>
g1 4
 
ITEMS IN/NEAR FIELD SAMPLING KIT
                                                              'TEM QUANTITY Case  for  Equipment Plastic    Bags  (assorted)          60 Cubitainers (1 gallon)                15 Rubber Gloves                          4 pair Digging Tools (small)                  3 Felt Tip,Marker (perm).
Note Pads (3x5)
Pens  (black)
Masking Tape      (2")                1 roll Cutting Shears Rubber Bands                          1 box Paper Towels                          1 pkg.
01sposabl  e Gloves                  2 boxes Smears    and Holders                100 Radiation Signs Barricade Tape                        1 roll Pocket Knife                          1 Syphon Pump Environmental Program                  1 set Instruction Manual, Contains only Section 12, Radiological Monitoring Program Procedures Attachment B-1 Page  1  of 2 PROCEDURE NUMBER      REVISlON NUMBER        PAGE NUMBER 13.14.4                9                                    13.14.4-22 of 91 VSP.598 A1 (9 N)
 
II g
I
 
CQIMTIRQLLEO CQPY INSTRUCTIONS FIELD SAMPLING KIT Locations:
o  Kit  1FS  - Field  Team    Cabinet Number 1,    PSF Ambulance Garage o  Kit  2FS    Field  Team    Cabinet Number 2,    PSF Ambulance Garage o  Kit  3FS  Field Team      Cabinet Number    3., PSF Ambulance Garage o  Kit 4FS - Headquarters, Cabinet          Number 4, Headquarters    MPF, 1st Floor,      Room 201
                  '~oarterl  (or  if seal  not  intact):
o  Inventory contents        and ensure    required quantities are correct.
o  Check  physical condition of contents          and  replace as necessary.
                        . o  Inspect    Environmental      Program    Instruction Manual, Section    12 Procedures    for latest revision      and  replace as necessary.
Attachment B-1 Page  2 of  2 PROCEDURE NUMBER              REVISION NUMBER      PAGE NUMBER 13.14.4                      9                                      13.14.4-23 of  91 WP.59S Rl (9 83)
 
P
'W f~
 
ITEMS IN/NEAR PROTECTIVE CLOTHING  KIT ITEM                        9UANTITY Case  for  Equipmen't Hoods Paper Coveralls Rubber Gloves                      3 pair Rubber Boots                        3 pair Masking Tape (2")                  2 rolls Full-Face Respirators with Cartridges Rain Suits Razor and Shaving Cream            1  set Plastic    Bags                  Assorted Skull caps Cotton glove liners                1 pkg.
t PROCEDURE NUMBER WP 598 Rl (9 83) 13.14.4 REVISION NUMBER 9
Attachment B-2 Page  1 of PAGE NUMBER 2
13.14 '-24 of 91
 
C;
  ~l "E
~
gg gi
 
INSTRUCTIONS PROTECTIVE CLOTHING  KIT Locations:
o    Kit  1PC    Field  Team  Cabinet Number 1 o    Kit  2PC    Field  Team  Cabinet Number 2 o    Kit  3PC    Field  Team  Cabinet Number 3 o    Kit 4PC    Headquarters
                  ~Nonth1 o    Check  condition of respirators
                  ~oarterl  (or  if seal  not  intact):
o    Inventory contents o    Check  physical condition of contents      and replace as necessary Attachment B-2 Page  2 of 2 PROCEDURE NUMBER            REVISION NUMBER      PAGE NUMBER 13.14.4                    9                                  13.14.4-25 of  91 WP 598 Rl (9KII
 
~r It
  't
 
Lt:QIMmQLLEO lt:QPV ITEMS IN/NEAR AIR SAMPLING KIT ITEM                    gUANTITY Case  for  Equipment            1 Portable Air Sampler            1 Paper  Filters              100 Note Pads (3x5)
Pens  (Black)
Charcoal Cartridges Tweezer Silver Eeolite Cartridges H809C Manual Spare Fuse Stopwatch Alligator  Forceps Attachment B-3 Page 1 of 2 PROCEDURE NUMBER        REVISION NUMBER      PAGE NUMBER 13.14.4                9.                            13.14.4-26 of 91 wP.59$ R1 I9 aII
 
I INSTRUCTIONS AIR SAMPLING KIT Locations:
o    Kit 1AS      Field  Team  Cabinet Number 1 o    Kit  2AS    Field  Team  Cabinet Number 2 o    Kit  3AS  - Field  Team  Cabinet Number 3 o    Kit 4AS      Headquarters
                  ~narterl  (or    if seal    not intact):
Inventory contents Check    physical condition of contents      and replace as necessary Verify air sampler calibration date will not            be exceeded  prior to the next quarterly check Start-up air sampler Perform operational check of stopwatch.
Attachment 8-3 of e PROCEDURE NUMBER            REVISIGN NUMBER Page 2 PAGE NUMBER 2
13.14.4                      9                                  13.14.4-27 of  91 WP 598 Rt (983)
 
ITEHS IN/NEAR INSTRUMENTATION KIT ITEM                                                  gUANTITY Case for Equipment Dose Rate Heter (HicroR)
Dose Rate Meter ( Ion Chamber)
Count Rate Heter (w/G-H Pancake Probe)                                          1 Pocket Dosimeter (0-5 R Range)                                  3 Pocket Dosimeter. (0-500 mR Range)                              3 Dosimeter Charger                                              1 TLD Badges                                                      2 Portable Radio and microphone                                  2  (Headquarters  kit only)
AC  Radio Charger                                              1 Check Source Cs-137                                            1 Desiccant                                                      1 Iodine Tablets                                                  3  sets Calculator and charger                                          1 0-Cell Batteries 9-Volt Batteries                                                2 Battery (6-volt)                                                1 Note Pads    (3x5)                                            3 Pens  (black)                                                  3 Phillips Screwdriver                                            1 Compass                                                        1 Battery Lantern (6-volt)                                        1 Flashlight                                                      1, First  Aid  Kit (In Cabinet)                                  1 Clipboard with the following (In Cabinet):                      1 10 mi Zone Hap-Book Emergency Response Log
                          - S-l/2    x 11    Tablet WA  State  Road  Atlas ( In Cabinet)
Expandable    Folder/Worksheet Packet Containing (In Cabinet)
Useful Phone      Numbers Change                                              $ 5.00 Credit Cards                                            3 (1 Each:    Shell, Chevron, Mobil)
                          -  Set Field      Team Worksheets:
                                  - Checklist for      Equipment Test                2 Exposure Rate      Measurement    Workshe et    20 Contamination      Survey Worksheet            10
                                  -  Environmental Sample Idenfication Form        20
                                  -*Wood Stakes, Survey Markers                    10 Attachment 8-4 Page  1 of 3 PROCEOURE NUMBER                REVISION NUMBER      PAGE NUMBER 13.14.4                        9                                    13.14.4-28 of  91 1
WP 59$ R1 (9 83)
 
lI I>
I lf ~
14
 
t:QNTRQLLED CQPY ITEMS IN/NEAR INSTRUMENTATION    KIT (Continued)
ITEM                                                  gUANTITY
                                      - Air Sampling Worksheet                          20
                                      - Aerial Radiological Survey      Oata Sheet      5
                                      - Aerial Monitoring Aircraft      Crew Exposure Record                                10 After Action Report                              5 Personnel Contamination      Report              5
                                      -  Personnel  Clothing Contamination Report      5 Set of Fi el d Team P rocedures Listed Below:
(In Cabinet)
EPIP 73.9.1 "Envi ronmenta 1 Fi el d Team Ope rat ons"
                              - EPIP 13.9.2 "Field Exposure Rate Surveys" i
EPIP 13.9.3 "Portable Air Sampling"
                              - EPIP 13.9.4 "TLO and Fixed Air Sample Retrieval" EPIP 13.9.5 "Environmental Sample Collection" EPIP 13.9.6 "Field Analysis of Environmental Samples" EPIP    13.9.7 "Aerial Monitoring" EPIP    13.13.4 "Post Incident Reporting" EPIP    13.14.4 "Emergency Equipment" Excerpt, Attachment 8 "Emergency Operations Facility Emergency Equipment" RPI    12.53      "Personnel Contamination Survey" Attachment B-4 Page 2  of 3 PROCEDURE NUMBER              REVISION NUMBER      PAGE NUMBER 13.14.4                      9                                    13.14.4-29 of 91 WP.$ 98 R1 (9 N)
 
+l h
pi
 
INSTRUCTIONS INSTRUMENTATION    KIT Locations:
Kit  1IK    Field  Team  Cabinet Number    1 Kit  2IK    Field  Team  Cabinet Number    2 Kit  3IK    Field  Team  Cabinet Number    3 Kit 4IK      Headquarters S~ionthl Verify that blank sign-in and sign-out forms (similar to Attachments H and    I) are inside the emergency cabinet door, and a copy of EPIP 13.14.4 "Emergency Equipment", Attachment 8-4, is available inside the  kit.
Replace    radios and batteries      in Headquarters Kit (obtain replacement radios    and  batteries    from  radio/battery charging unit in PSF Room 118A  cabinet    next to decon showers and deliver replaced radio/
batteries to Telecommunications for operational check.)
Verify that all procedures are the current revision and worksheets are similar to the current revisions and have not been written on.
                ~uarterl    (or  if seal    not  intact):
Inventory contents Check  physical condition of contents          and replace as necessary Verify portable instrument calibration dates will not                be  exceeded prior to the next quarterly check:
Perform operational checks:
o    Pocket dosimeters      (rezero) o    Portable instruments (battery check) o    Oosimeter charger o    Ca cul ator 1
o    Battery lantern o    F1 ashl i ght Verify expiration dates            will  not be exceeded    prior to  the  next quarterly check:
o    Credit card" o    Iodine tablets Attachment 8-4 Page 3  of 3 PROCEDURE NUMBER                  REVISION NUMBER        PAGE NUMBFR 13.14.4                                                            13.14.4-30 of  91 WP 59$ Rt (9 83)
 
Jl I'
 
CQNTRQLLED CQPY ITEMS IN/NEAR MULTICHANNEL ANALYZER    KIT ITEM                        gUANTITY Case  for  Equipment Multichannel Analyzer NaI Detector Lead Shield      Holder and Trays Check Source 8a-133 Check Source Cs-137 Note Pads    (3x5)
Pens    (black)
MCA  Data Sheet Davidson Model 10568 Instruction      Manual Abridged Radiological Health Handbook EPIP  13.9.6, Attachment      D Portable Instrument Calibration      Data Sheets          10 (desired quantity)
Attachment 8-5 Page 1  oF 2 PROCEDURE NUMBER        RF VIS lON NUMBER        PAGE NUMBER 13.14.4                  9                                  13.14.4-31 of  91 WP.598 Rl (9 83)
 
IN INSTRUCTIONS MULTICHANNEL ANALYZER  KIT Locations:
o    Kit  1HA    Field  Team  Cabinet Number 1 o    Kit  2HA  Field Team      Cabinet Number 2
                  ~oarterl  (or  if seal    not intact):
o    Inventory contents o    Check  physical condition of contents      and replace as necessary o    Verify multi-channel analyzer calibration date will not              be exceeded prior to next quarterly check o    Perform operational check on multi-channel analyzer Attachment 8-5 Page 2  of 2 PROCEDURE NUMBER              REVISlON NUMBER      PAGE NUMBER 13.14.4                                                        13.14.4-32 of  91 WP.SSB Rl (9 83)
 
je kJ'~,''
 
CQNTRQLLED CQPY ITEHS IN/NEAR DECON  CABINET ITEM                                                        gUANTITY Decon Record  Forms                                                20 Clip board                                                            1 Decon. Procedures (1 set of each)
EPIP 13.7.4 "Personnel Decontamination        Operations at the Emergency Operations Facility" EPIP 13.7.5 "Decontamination Operations, at Remote Decontamination Locations" EPIP 13.7.7 "Emergency Operations Facility First Aid Center Operations" EPIP 13.14;4 "Emergency Equipment" Excerpt, Attachment      B Red  markers Black markers Black ink pens 3" x 5" notepads Smears                                                          1,000 Masking tape                                                          1 Cotton tip applicators                                          2,000 Yellow magenta tape                                                    1 Tongue depressants                                                  20 Bottles Pax-land soap                                                  2 Scrubbing sponges                                                      2 Lava soap                                                              1 Ivory soap                                                            2 Soft scrub brushes                                                    2 Hoist towelettes-                                                  200 4" x 4" gauze sponges                                              200 3" x 3" gauze sponges                                              300 Scissors                                                              1 Paper towels                                                        500 Blank signs                                                          5 Paper coveral 1 s                                                    6 Rubber gloves                                                        6  pr Plastic booties                                                      20  pr Count Rate Heter (w/Alpha Probe)                                      1 Count Rate Heter (w/G-H Pancake Probe)                                1 Yellow plastic bags                                                  20 Clear plastic bags                                                  20 Extra soap                                                            2  boxes Potassium Permanganate                                                2  bottles Sodium  Bisulfite                                                    2  bottles Facial Tissue                                                        1  boxes Colloidion                                                            1  bottle Small Paper Cups                                                      1  box Saline Solution                                                      1  bottle Camera, Polaroid (Hod. Impulse)                                      1 Tape Recorder,    Dictaphone (Hod. 1252)                              1 Attachment B-6 Page  1 of  2 PROCEDURE NUMBER                  REVISION NUMBER  PAGE NUMBER 13.14.4                      9                            13.14.4-33 of    91 WP.588 81 (8 83)
 
g~t INSTRUCTIONS DECON    CABINET Location:
o  DC    Emergency Cabinet Number 14, PSF Decon Shower Area
                ~Mont hi o  Verify that all procedures are the current revisions and forms are similar to the current revision and have not been written on ~
                ~uarterl  (or  if sea'I  not intact):
o  Inventory contents o  Check    physical condition of contents      and  replace as necessary o  Verify calibration/expiration dates will not            be exceeded  prior to next quarterly check:
o      Portable instrument o      Chemicals o  Perform    operational      check  on portable  instruments    (battery check)
Attachment 8-6 Page  2 of 2 PROCEDURE NUMBER          REVISION NUMBER      PAGE NUMBER 13.14.4                      9                                    13.14.4-34 of  91
 
ti I'v
        \
h
 
ITEMS IN/NEAR EXTRA PROTECTIVE CLOTHING UANTITY Box  for  Equipment Paper Coveralls                  25 Plastic  Shoe Covers            20  Pairs Oisposable Gloves                1  Box Rubber Gloves                    5 ~
Pair Hoods                            12 Hasking Tape                      5  Rolls Rubber Boots                      2  Pair Attachment B-7 Page  1  of 2 PROCEDURE NUMBER        REVISION NUMBER      PAGE NUMBER 13.14.4                9                                  13.14.4-35 of 91 WP 598 Bl (9 83)
 
4
    ~!
V A  q n
  ~'n
 
CQNTIRQLLED CQPY INSTRUCTIONS EXTRA PROTECTIVE CLOTHING Location:
o    Kit  1XP  Emergency      Cabinet Number 6,  PSF  Ambulance Garage o    Kit  2XP  Emergency      Cabinet Number 6, PSf Ambulance Garage
                ~oarterl  (or  if seal    not intact):
o    Inventory contents o    Check    physical condition of contents      and  replace as necessary Attachment 8-7 Page  2 of 2 PROCEDURE NUMBER          REVISION NUMBER      PAGE NUMBER 13.14.4                      9                                    13.14.4-36 of  91
 
T
~ t
 
t."QNTRQLLED jt.QPY a
ITEMS IN/NEAR FIELO LAB SUPPLIES ITEM                    gUANTITY 100  ft Extension  Cord Air Sample Cart. Purger Radio Charger and Antenna Air Bottle (nearly full)
Attachment B-8 Page  1  of 2 PROCEDURE NUMBER        REVISION NUMBEA      PAGE NUMBER 13.14.4                9                              13.14.4-37 of 91 WP.598 RT (8 83)
 
$p'(, b 1
0
 
INSTRUCTIONS FIELD LAB SUPPLIES Locations:
o    Kit  1FL  Field Team      Cabinet Number 1,  PSF  Ambulance Garage o    Kit  2FL  - Field  Team  Cabinet Number 2,  PSF  Ambulance Garage
                ~oar teri (or  if seal    not  intact):
o    Inventory contents o    Check  physical condition of contents      and  replace as necessary o    Verify air bottle is nearly full o    Perform      operational      check  on  air    sample  cartridge  purge manifold.
Attachment 8-8 Page  2 of 2 PROCEDURE NUMBER          REVISION NUMBER      PAGE NUMBER 13.14.4                                                            13.14.4-38 of 91 WP 59SAl(983)
 
~ th ITEMS IN/NEAR PORTABLE GENERATOR SET ITEM                      gUANTITY Honda  Generator Gas  Can Siphon Spare Fuses:
8 amp 15 amp Tool  Kit Manual Attachment B-9 Page  1  of 2 PROCEDURE NUMBER        REVISION NUMBER      PAGE NUMBER 13,14.4                9                                13.14.4-39 of 91 WP.598 Rl (9 83)
 
,t C 'I
 
CQNTRQLLED CQPY INSTRUCTIONS PORTABLE GENERATOR SET Locations:
o    Kit  1PG    Emergency Cabinet Number 7, PSF Ambulance Garage o    Kit  2PG    Emergency Cabinet Number 7, PSF Ambulance Garage
                  ~uarterl  (or  if seal    not  intact):
o    Inventory contents o    Check  physical condition of contents  and replace as necessary o    Start-up    Honda  generator.
Attachment B-9 Page  2  of 2 PROCEDURE NUMBER              REVISION NUMBER      PAGE NUMBER 13.14.4                      9                              13.14.4-40 of  91 WP 598 Bi (9 83)
 
1f t
  'E 4
 
ITEMS IN/NEAR RIVER EVACUATION MONITORING KIT ITEM                          gUANTITY TLD Dosimeter Charger Pocket Dosimeter:
0-5 R 0-500 mR 0-50R Dose Rate    .
Meter RO-2A Micro R meter Check Source Respirators                              3 KI Tablets                                1 bottle Coveralls, paper                          3 pairs Hoods Shoe covers                              3 pairs Rubber gloves                            3 pairs Surgical gloves                          1 box Rain  suits Tape, masking                            1 roll Pens Portable Radio Radio headset Writing Tablet Personnel  Exposure Record Emergency Response      Log              1 Pad Procedures,                              1 each
                                      -EPIP  13.5.4,    Columbia. River Evacuation
                                      -EPIP  13,9.1,    Environmental Field  Team  Operations
                                      -EPIP  13.9.2,    Field Exposure Rate Survey
                                      -EPIP  13.9.8,    River Evacuation Monitoring Attachment 8-10 Page  1  of 2 PROCEDURE NUMBER        REVISION NUMBER      PAGE NUMBER 13.14.4                9                                    13.14.4-41 of  91 WP 598 R1 (9 aI)
 
I' INSTRUCTIONS RIVER EVACUATION MONITORING KIT Location:
o  Kit    1RM    Cabinet Number 4, Headquarters    MPF,  1St Floor,    Room 201
                      ~Month 1 Replace      radio    and                              checks radio and batteries. (Obtain replacement batteries from radio/battery charging unit in,PSF Room 118A cabinet next to decon showers and deliver replaced radio/
batteries to Telecommunications for operational                )
Verify that        blank sign-in and sign-out forms (similar to Attachment      H  and I) are inside the emergency cabinet door, and a  copy of    EPIP 13.14.4 "Emergency Equipment", Attachment 8-10, is available inside the        kit.
Verify that vehicle        keys are in the cabinet,  Headquarters,    MFP, Room 201 Perform    respirator    check per RPI 8.3 Verify all procedures are the current revision and forms are similar to the current revision and have not been written on;
                      ~uarterl  (or  if seal    not  intact):
o    Inventory contents I
o    Check    physical condition of contents    and replace as necessary o    Verify calibration/expiration dates will not          be exceeded    prior
                              ~
to next quarterly check.
o    Perform operational checks:
o      Portable instrument (battery check)
Attachment 8-10 Page  2 of  2 PROCEOURE NUMBER                  REVISlQN NUMBER      PAGE NUMBER 13.14.4                                                        13.14.4-42 of    91 WP 598 Rl (983)
 
"I tC''*i 1C tlgq
    , Ifl l
 
ITEMS IN/NEAR RIVER EVACUATION DECONTAMINATION KIT ITEM                      UANTITY TLD Dosimeter Charger Pocket Dosimeter:
0-5 R                          3 0-500 01R                      3 Bucket                              1 Sponges                            5 Soap                                2 bottles Toweling, disposable              10 Ribbon, Rad. Barrier            2 rolls Signs, Rad. Warning w/inserts      4 Coveralls, paper                    5 pairs Hoods                              5 Shoe  covers                        5 pairs Rubber gloves                      10 pairs Surgical gloves                    1 box Rain  suits                        3 Tape                                1 roll Plastic  bags (50 gal. yellow)    2 Count Rate Meter (w/G-H Pancake Probe)          1 Check Source                        1 Portable Radio                      1 KI Tablets                          1 bottle Survey Hap and Record Form        10 Personnel Contamination Form      10 Pens                                5 Procedures                          1 each
                                    -EPIP 13.5.4
                                    -EPIP 13.7.5
                                    -EPIP 13.9.1
                                    -EPIP 13.9.2
                                    -EPIP 13.9.8
                                    -RPI 12.34
                                    -RPI 12.53 Attachment    B-ll Page  1 of  2 PROCEDURE NUMBER        REVISION NUMBER      PAGE NUMBER 13.14.4                                              13.14.4-43 of 91 WP 598 R1 (9.8Q)
 
( "r S
h'l I
C,
 
CQNTIRQlLILEG CQFf INSTRUCTIONS RIVER EVACUATION OECONTAHINATION KIT Location:
o  Kit  1RO    Emergency Cabinet Number 4, Headquarters  NPF, 1St Floor,    Room 201 M~onthl Replace      radio  and batteries.  (Obtain replacement radio and batteries      from radio/battery charging unit in PSF Room 118A cabinet next to decon showers and deliver replaced radio/
batteries to Telecommunications for operational check.)
Verify all procedures are the current revision and forms are similar to the current revision and have not been written on.
                  ~narterl  (or  if seal    not intact):
o  Inventory contents Check    physical condition of contents  and replace as necessary Verify calibration/expiration dates will not        be exceeded  prior to next quarterly check.
o  Perform operational checks:
o      Portable instrument (battery
                                                              \
check)
Attachment 8-11 Page  2 of 2 PROCEDURE NUMBER              REVISION NUMBER      PAGE NUMBER 13.14.4                    9.                              13.14.4-44 of  91 WP 59B Rl I9.83)


EMERGENCY OPERATIONS FACILITY/HEAD UARTERS EMERGENCY E UIPMENT 8-1 Field Sampling Kit 8-2 Protective Clothing Kit 8-3 Air Sampling Kit 8-4 Instrumentation Kit 8-5 Multichannel Analyzer Kit 8-6 Oecon Cabinet 8-7 Extra Protective Clothing 8-8 Field Lab Supplies 8-9 Portable Generator Set 8-10 River Evacuation Monitoring Kit B-ll River Evacuation Oecontamination Kit 8-12 Aerial Monitoring Kit 8-13 Oecon Storage Trailer 8-14 Equipment for PASS Attachment Section 8 Page 1 of 1 PROCEDURE NUMBER 13.14.4 WP 598 II1 (9 aI)REVISION NUMBER 9 PAGE NUMBER 13.14.4-21 of 91 t>>g1 4 ITEMS IN/NEAR FIELD SAMPLING KIT'TEM QUANTITY Case for Equipment Plastic Bags (assorted)
Cubitainers (1 gallon)Rubber Gloves Digging Tools (small)Felt Tip,Marker (perm).Note Pads (3x5)Pens (black)Masking Tape (2")Cutting Shears Rubber Bands Paper Towels 01sposabl e Gloves Smears and Holders Radiation Signs Barricade Tape Pocket Knife Syphon Pump Environmental Program Instruction Manual, Contains only Section 12, Radiological Monitoring Program Procedures 60 15 4 pair 3 1 roll 1 box 1 pkg.2 boxes 100 1 roll 1 1 set Attachment B-1 Page 1 of 2 PROCEDURE NUMBER 13.14.4 REVISlON NUMBER 9 PAGE NUMBER 13.14.4-22 of 91 VSP.598 A1 (9 N)
II g I CQIMTIRQLLEO CQPY INSTRUCTIONS FIELD SAMPLING KIT Locations:
o Kit 1FS-Field Team Cabinet Number 1, PSF Ambulance Garage o Kit 2FS-Field Team Cabinet Number 2, PSF Ambulance Garage o Kit 3FS-Field Team Cabinet Number 3., PSF Ambulance Garage o Kit 4FS-Headquarters, Cabinet Number 4, Headquarters MPF, 1st Floor, Room 201'~oarterl (or if seal not intact): o Inventory contents and ensure required quantities are correct.o Check physical condition of contents and replace as necessary.
.o Inspect Environmental Program Instruction Manual, Section 12 Procedures for latest revision and replace as necessary.
Attachment B-1 Page 2 of 2 PROCEDURE NUMBER 13.14.4 REVISION NUMBER 9 PAGE NUMBER 13.14.4-23 of 91 WP.59S Rl (9 83)
P'Wf~
ITEMS IN/NEAR PROTECTIVE CLOTHING KIT ITEM 9UANTITY Case for Equipmen't Hoods Paper Coveralls Rubber Gloves Rubber Boots Masking Tape (2")Full-Face Respirators with Cartridges Rain Suits Razor and Shaving Cream Plastic Bags Skull caps Cotton glove liners 3 pair 3 pair 2 rolls 1 set Assorted 1 pkg.t PROCEDURE NUMBER 13.14.4 REVISION NUMBER 9 Attachment B-2 Page 1 of 2 PAGE NUMBER 13.14'-24 of 91 WP 598 Rl (9 83)
C;~l"E~gg gi INSTRUCTIONS PROTECTIVE CLOTHING KIT Locations:
o Kit 1PC-Field Team Cabinet Number 1 o Kit 2PC-Field Team Cabinet Number 2 o Kit 3PC-Field Team Cabinet Number 3 o Kit 4PC-Headquarters
~Nonth1 o Check condition of respirators
~oarterl (or if seal not intact): o Inventory contents o Check physical condition of contents and replace as necessary Attachment B-2 Page 2 of 2 PROCEDURE NUMBER 13.14.4 WP 598 Rl (9KII REVISION NUMBER 9 PAGE NUMBER 13.14.4-25 of 91
~r It't Lt:QIMmQLLEO lt:QPVITEMS IN/NEAR AIR SAMPLING KIT ITEM gUANTITY Case for Equipment Portable Air Sampler Paper Filters Note Pads (3x5)Pens (Black)Charcoal Cartridges Tweezer Silver Eeolite Cartridges H809C Manual Spare Fuse Stopwatch Alligator Forceps 1 1 100 Attachment B-3 Page 1 of 2 PROCEDURE NUMBER 13.14.4 wP.59$R1 I9 aII REVISION NUMBER 9.PAGE NUMBER 13.14.4-26 of 91 I
INSTRUCTIONS AIR SAMPLING KIT Locations:
o Kit 1AS-Field Team Cabinet Number 1 o Kit 2AS-Field Team Cabinet Number 2 o Kit 3AS-Field Team Cabinet Number 3 o Kit 4AS-Headquarters
~narterl (or if seal not intact): Inventory contents Check physical condition of contents and replace as necessary Verify air sampler calibration date will not be exceeded prior to the next quarterly check Start-up air sampler Perform operational check of stopwatch.
e PROCEDURE NUMBER 13.14.4 REVISIGN NUMBER 9 Attachment 8-3 Page 2 of 2 PAGE NUMBER 13.14.4-27 of 91 WP 598 Rt (983)
ITEM ITEHS IN/NEAR INSTRUMENTATION KIT gUANTITY Case for Equipment Dose Rate Heter (HicroR)Dose Rate Meter (Ion Chamber)Count Rate Heter (w/G-H Pancake Probe)Pocket Dosimeter (0-5 R Range)Pocket Dosimeter.
(0-500 mR Range)Dosimeter Charger TLD Badges Portable Radio and microphone AC Radio Charger Check Source Cs-137 Desiccant Iodine Tablets Calculator and charger 0-Cell Batteries 9-Volt Batteries Battery (6-volt)Note Pads (3x5)Pens (black)Phillips Screwdriver Compass Battery Lantern (6-volt)Flashlight First Aid Kit (In Cabinet)Clipboard with the following (In Cabinet):-10 mi Zone Hap-Book-Emergency Response Log-S-l/2 x 11 Tablet WA State Road Atlas (In Cabinet)Expandable Folder/Worksheet Packet Containing (In Cabinet)-Useful Phone Numbers-Change-Credit Cards (1 Each: Shell, Chevron, Mobil)-Set Field Team Worksheets:
-Checklist for Equipment Test-Exposure Rate Measurement Workshe-Contamination Survey Worksheet-Environmental Sample Idenfication
-*Wood Stakes, Survey Markers 1 3 3 1 2 2 1 1 1 3 1 2 1 3 3 1 1 1 1, 1 1$5.00 3 2 20 10 20 10 et Form (Headquarters kit only)sets Attachment 8-4 Page 1 of 3 PROCEOURE NUMBER 13.14.4 REVISION NUMBER 9 PAGE NUMBER 13.14.4-28 of 91 1 WP 59$R1 (9 83) lI I>I lf~14 t:QNTRQLLED CQPY ITEMS IN/NEAR INSTRUMENTATION KIT (Continued)
ITEM gUANTITY-Air Sampling Worksheet 20-Aerial Radiological Survey Oata Sheet 5-Aerial Monitoring Aircraft Crew Exposure Record 10-After Action Report 5-Personnel Contamination Report 5-Personnel Clothing Contamination Report 5 rocedures Listed Below: Set of Fi el d Team P (In Cabinet)-EPIP 73.9.1-EPIP 13.9.2-EPIP 13.9.3-EPIP 13.9.4-EPIP 13.9.5-EPIP 13.9.6-EPIP 13.9.7-EPIP 13.13.4-EPIP 13.14.4-RPI 12.53"Envi ronmenta 1 Fi el d Team Ope rat i ons""Field Exposure Rate Surveys""Portable Air Sampling""TLO and Fixed Air Sample Retrieval""Environmental Sample Collection""Field Analysis of Environmental Samples""Aerial Monitoring""Post Incident Reporting""Emergency Equipment" Excerpt, Attachment 8"Emergency Operations Facility Emergency Equipment""Personnel Contamination Survey" Attachment B-4 Page 2 of 3 PROCEDURE NUMBER 13.14.4 WP.$98 R1 (9 N)REVISION NUMBER 9 PAGE NUMBER 13.14.4-29 of 91
+l h pi Locations:
INSTRUCTIONS
, INSTRUMENTATION KIT Kit 1IK-Field Team Cabinet Number 1 Kit 2IK-Field Team Cabinet Number 2 Kit 3IK-Field Team Cabinet Number 3 Kit 4IK-Headquarters S~ionthl Verify that blank sign-in and sign-out forms (similar to Attachments H and I)are inside the emergency cabinet door, and a copy of EPIP 13.14.4"Emergency Equipment", Attachment 8-4, is available inside the kit.Replace radios and batteries in Headquarters Kit (obtain replacement radios and batteries from radio/battery charging unit in PSF Room 118A cabinet next to decon showers and deliver replaced radio/batteries to Telecommunications for operational check.)Verify that all procedures are the current revision and worksheets are similar to the current revisions and have not been written on.~uarterl (or if seal not intact): Inventory contents Check physical condition of contents and replace as necessary Verify portable instrument calibration dates will not be exceeded prior to the next quarterly check: Perform operational checks: o Pocket dosimeters (rezero)o Portable instruments (battery check)o Oosimeter charger o Ca 1 cul ator o Battery lantern o F1 ashl i ght Verify expiration dates will not be exceeded prior to the next quarterly check: PROCEDURE NUMBER 13.14.4 REVISION NUMBER o Credit card" o Iodine tablets Attachment 8-4 Page 3 of 3 PAGE NUMBFR 13.14.4-30 of 91 WP 59$Rt (9 83)
Jl I' CQNTRQLLED CQPY ITEMS IN/NEAR MULTICHANNEL ANALYZER KIT ITEM Case for Equipment Multichannel Analyzer NaI Detector gUANTITY Lead Shield Holder and Trays Check Source 8a-133 Check Source Cs-137 Note Pads (3x5)Pens (black)MCA Data Sheet Davidson Model 10568 Instruction Manual Abridged Radiological Health Handbook EPIP 13.9.6, Attachment D Portable Instrument Calibration Data Sheets 10 (desired quantity)Attachment 8-5 Page 1 oF 2 PROCEDURE NUMBER 13.14.4 WP.598 Rl (9 83)RF VIS lON NUMBER 9 PAGE NUMBER 13.14.4-31 of 91 IN INSTRUCTIONS MULTICHANNEL ANALYZER KIT Locations:
o Kit 1HA-Field Team Cabinet Number 1 o Kit 2HA-Field Team Cabinet Number 2~oarterl (or if seal not intact): o Inventory contents o Check physical condition of contents and replace as necessary o Verify multi-channel analyzer calibration date will not be exceeded prior to next quarterly check o Perform operational check on multi-channel analyzer Attachment 8-5 Page 2 of 2 PROCEDURE NUMBER 13.14.4 REVISlON NUMBER PAGE NUMBER 13.14.4-32 of 91 WP.SSB Rl (9 83) je kJ'~,''
CQNTRQLLED CQPY ITEHS IN/NEAR DECON CABINET ITEM Decon Record Forms Clip board Decon.Procedures (1 set of each)-EPIP 13.7.4"Personnel Decontamination Operations at the Emergency Operations Facility"-EPIP 13.7.5"Decontamination Operations, at Remote Decontamination Locations"-EPIP 13.7.7"Emergency Operations Facility First Aid Center Operations"-EPIP 13.14;4"Emergency Equipment" Excerpt, Attachment B Red markers Black markers Black ink pens 3" x 5" notepads Smears Masking tape Cotton tip applicators Yellow magenta tape Tongue depressants Bottles Pax-land soap Scrubbing sponges Lava soap Ivory soap Soft scrub brushes Hoist towelettes-4" x 4" gauze sponges 3" x 3" gauze sponges Scissors Paper towels Blank signs Paper coveral 1 s Rubber gloves Plastic booties Count Rate Heter (w/Alpha Probe)Count Rate Heter (w/G-H Pancake Probe)Yellow plastic bags Clear plastic bags Extra soap Potassium Permanganate Sodium Bisulfite Facial Tissue Colloidion Small Paper Cups Saline Solution Camera, Polaroid (Hod.Impulse)Tape Recorder, Dictaphone (Hod.1252)Attachment B-6 Page 1 of 2 gUANTITY 20 1 1,000 1 2,000 1 20 2 2 1 2 2 200 200 300 1 500 5 6 6 pr 20 pr 1 1 20 20 2 boxes 2 bottles 2 bottles 1 boxes 1 bottle 1 box 1 bottle 1 1 PROCEDURE NUMBER 13.14.4 REVISION NUMBER 9 PAGE NUMBER 13.14.4-33 of 91 WP.588 81 (8 83) g~t INSTRUCTIONS DECON CABINET Location: o DC-Emergency Cabinet Number 14, PSF Decon Shower Area~Mont hi o Verify that all procedures are the current revisions and forms are similar to the current revision and have not been written on~~uarterl (or if sea'I not intact): o Inventory contents o Check physical condition of contents and replace as necessary o Verify calibration/expiration dates will not be exceeded prior to next quarterly check: o Portable instrument o Chemicals o Perform operational check on portable instruments (battery check)Attachment 8-6 Page 2 of 2 PROCEDURE NUMBER 13.14.4 REVISION NUMBER 9 PAGE NUMBER 13.14.4-34 of 91 ti I'v\h ITEMS IN/NEAR EXTRA PROTECTIVE CLOTHING Box for Equipment Paper Coveralls Plastic Shoe Covers Oisposable Gloves Rubber Gloves Hoods Hasking Tape Rubber Boots UANTITY 25 20 Pairs 1 Box 5~Pair 12 5 Rolls 2 Pair Attachment B-7 Page 1 of 2 PROCEDURE NUMBER 13.14.4 WP 598 Bl (9 83)REVISION NUMBER 9 PAGE NUMBER 13.14.4-35 of 91 4~!V A q n~'n CQNTIRQLLED CQPY INSTRUCTIONS EXTRA PROTECTIVE CLOTHING Location: o Kit 1XP-Emergency Cabinet Number 6, PSF Ambulance Garage o Kit 2XP-Emergency Cabinet Number 6, PSf Ambulance Garage~oarterl (or if seal not intact): o Inventory contents o Check physical condition of contents and replace as necessary Attachment 8-7 Page 2 of 2 PROCEDURE NUMBER 13.14.4 REVISION NUMBER 9 PAGE NUMBER 13.14.4-36 of 91 T~t t."QNTRQLLED jt.QPY a ITEMS IN/NEAR FIELO LAB SUPPLIES ITEM 100 ft Extension Cord Air Sample Cart.Purger Radio Charger and Antenna Air Bottle (nearly full)gUANTITY Attachment B-8 Page 1 of 2 PROCEDURE NUMBER 13.14.4 WP.598 RT (8 83)REVISION NUMBEA 9 PAGE NUMBER 13.14.4-37 of 91
$p'(, b 0 1 INSTRUCTIONS FIELD LAB SUPPLIES Locations:
o Kit 1FL-Field Team Cabinet Number 1, PSF Ambulance Garage o Kit 2FL-Field Team Cabinet Number 2, PSF Ambulance Garage~oar teri (or if seal not intact): o Inventory contents o Check physical condition of contents and replace as necessary o Verify air bottle is nearly full o Perform operational check on air sample cartridge purge manifold.Attachment 8-8 Page 2 of 2 PROCEDURE NUMBER 13.14.4 WP 59SAl(983)
REVISION NUMBER PAGE NUMBER 13.14.4-38 of 91
~th ITEMS IN/NEAR PORTABLE GENERATOR SET ITEM Honda Generator Gas Can Siphon Spare Fuses: 8 amp 15 amp Tool Kit Manual gUANTITY Attachment B-9 Page 1 of 2 PROCEDURE NUMBER 13,14.4 REVISION NUMBER 9 PAGE NUMBER 13.14.4-39 of 91 WP.598 Rl (9 83)
,t C'I CQNTRQLLED CQPY INSTRUCTIONS PORTABLE GENERATOR SET Locations:
o Kit 1PG-Emergency Cabinet Number 7, PSF Ambulance Garage o Kit 2PG-Emergency Cabinet Number 7, PSF Ambulance Garage~uarterl (or if seal not intact): o Inventory contents o Check physical condition of contents and replace as necessary o Start-up Honda generator.
Attachment B-9 Page 2 of 2 PROCEDURE NUMBER 13.14.4 REVISION NUMBER 9 PAGE NUMBER 13.14.4-40 of 91 WP 598 Bi (9 83) 1f t'E 4 ITEMS IN/NEAR RIVER EVACUATION MONITORING KIT TLD ITEM gUANTITY Dosimeter Charger Pocket Dosimeter:
0-5 R 0-500 mR 0-50R Dose Rate.Meter RO-2A Micro R meter Check Source Respirators KI Tablets Coveralls, paper Hoods Shoe covers Rubber gloves Surgical gloves Rain suits Tape, masking Pens Portable Radio Radio headset Writing Tablet Personnel Exposure Record Emergency Response Log Procedures, 3 1 bottle 3 pairs 3 pairs 3 pairs 1 box 1 roll 1 Pad 1 each-EPIP 13.5.4,-EPIP 13,9.1,-EPIP 13.9.2,-EPIP 13.9.8, Columbia.River Evacuation Environmental Field Team Operations Field Exposure Rate Survey River Evacuation Monitoring Attachment 8-10 Page 1 of 2 PROCEDURE NUMBER 13.14.4 WP 598 R1 (9 aI)REVISION NUMBER 9 PAGE NUMBER 13.14.4-41 of 91 I'
INSTRUCTIONS RIVER EVACUATION MONITORING KIT Location: 201 o Kit 1RM-Cabinet Number 4, Headquarters MPF, 1St Floor, Room~Month 1 Replace radio and batteries.(Obtain replacement radio and batteries from radio/battery charging unit in,PSF Room 118A cabinet next to decon showers and deliver replaced radio/batteries to Telecommunications for operational checks~)Verify that blank sign-in and sign-out forms (similar to Attachment H and I)are inside the emergency cabinet door, and a copy of EPIP 13.14.4"Emergency Equipment", Attachment 8-10, is available inside the kit.Verify that vehicle keys are in the cabinet, Headquarters, MFP, Room 201 Perform respirator check per RPI 8.3 Verify all procedures are the current revision and forms are similar to the current revision and have not been written on;~uarterl (or if seal not intact): o Inventory contents I o Check physical condition of contents and replace as necessary o Verify calibration/expiration dates will not be exceeded prior~to next quarterly check.o Perform operational checks: o Portable instrument (battery check)Attachment 8-10 Page 2 of 2 PROCEOURE NUMBER 13.14.4 WP 598 Rl (983)REVISlQN NUMBER PAGE NUMBER 13.14.4-42 of 91 "I 1C tC''*i tlgq , Ifl l ITEMS IN/NEAR RIVER EVACUATION DECONTAMINATION KIT ITEM TLD Dosimeter Charger Pocket Dosimeter:
0-5 R 0-500 01R Bucket Sponges Soap Toweling, disposable Ribbon, Rad.Barrier Signs, Rad.Warning w/inserts Coveralls, paper Hoods Shoe covers Rubber gloves Surgical gloves Rain suits Tape Plastic bags (50 gal.yellow)Count Rate Meter (w/G-H Pancake Probe)Check Source Portable Radio KI Tablets Survey Hap and Record Form Personnel Contamination Form Pens Procedures-EPIP 13.5.4-EPIP 13.7.5-EPIP 13.9.1-EPIP 13.9.2-EPIP 13.9.8-RPI 12.34-RPI 12.53 UANTITY 3 3 1 5 2 bottles 10 2 rolls 4 5 pairs 5 5 pairs 10 pairs 1 box 3 1 roll 2 1 1 1 1 bottle 10 10 5 1 each Attachment B-ll Page 1 of 2 PROCEDURE NUMBER 13.14.4 WP 598 R1 (9.8Q)REVISION NUMBER PAGE NUMBER 13.14.4-43 of 91
("r S h'l I C, CQNTIRQlLILEG CQFf INSTRUCTIONS RIVER EVACUATION OECONTAHINATION KIT Location: o Kit 1RO-Emergency Cabinet Number 4, Headquarters NPF, 1St Floor, Room 201 M~onthl Replace radio and batteries.(Obtain replacement radio and batteries from radio/battery charging unit in PSF Room 118A cabinet next to decon showers and deliver replaced radio/batteries to Telecommunications for operational check.)Verify all procedures are the current revision and forms are similar to the current revision and have not been written on.~narterl (or if seal not intact): o Inventory contents Check physical condition of contents and replace as necessary Verify calibration/expiration dates will not be exceeded prior to next quarterly check.o Perform operational checks: o Portable instrument (battery check)\Attachment 8-11 Page 2 of 2 PROCEDURE NUMBER 13.14.4 REVISION NUMBER 9.PAGE NUMBER 13.14.4-44 of 91 WP 59B Rl I9.83)
S A)
S A)
ITEHS IN/NEAR AERIAL HONITORING KIT TLD ITEH gUANTITY Dosimeter Charger Pocket Dosimeter:
0-5 R 0-500 mR 0-50R Dose Rate Heter RO-2A Micro R meter Check Source Portable Radio Writing Tablet Pens KI Tablets Personnel Exposure Record Field Team Haps Emergency Response'og Procedures 1 1 2 1 bottle 1 set 1 pad 1 each'-EPIP 13.9.1, Environmental Field Team Operations-EPIP 13.9.2, Field Exposure Rate Survey-EPIP 13,9.7, Aerial Honitoring Attachment 8-12 Page 1 of 2 PROCEDURE NUMBER 13.14.4 REVISION NUMBER 9 PAGE NUMBER~13.14.4-45 of 91
'pj g4 ,pi INSTRUCTIONS AERIAL MONITORING KIT Location: o Kit 1AM-Emergency Cabinet Number 4, Headquarters MPF, 1St Floor, Room 201 M~onth 1 o Replace radio and batteries.(Obtain replacement radio and batteries from radio/battery charges uni t in Room 118A cabinet next to decon showers and deliver replaced radio/batteries to Telecommunications for operational check,)o Verify all procedures are the current revision and forms are similar to the current revision and have not been written on.~narterl (or if seal not intact): o Inventory contents o Check physical condition of contents and replace as necessary o Verify calibration/expiration dates will not be exceeded prior to next quarterly check.o Perform operational checks: o Portable instrument (battery check)Attachment 8-12 Page 2 of 2 PROCEDURE NUMBER 13.14'REVISION NUMBER 9 PAGE NUMBER 13.14.4-46 of 91 WP 598 R'I (983) ge vA yr jif ITEMS IN/NEAR OECON STORAGE TRAILER Stanchions Rad.Rope Rad.signs w/asst.inserts Paper coveralls Protective clothing Rubber boots Respirators, full-face Rain suits Plastic booties (yellow)Totes (shoe covers)Rubber gloves Cotton glove liners Surgical gloves Ouct tape Check source Count Rate Heter (w/G-H Pancake Probe)Extra Probes/cables Dose Rate Meter (Ion Chamber)Liquid soap Grannular hand soap Cotton applicators Envelopes (3" x 5)SUrgical scrub brushes Smears Plastic bags (50 gal., yellow)Plastic bags (12" x 24", yellow)Potassium Iodide (KI)Sodium Bisulfite,capsules, Potassium Permangerate capsules Sponges Buckets Toweling Blankets Collapsable water containers (1 gal)Oosimeter Charger (with spare battery)Vacuum Cleaners (12 volt)Generator (Gasoline)
Fire Extinguisher gUANTITY 20 2 spools 20 4 cases 20 sets 10 pair 20 25 1 case 100 pair 100 pair 200 pair 5 boxes 20 rolls 1 3 3 2 1 case 5 lbs 1.box 1 box 20 2 boxes 2 rolls 1 roll 3 bottles 100 100 50 6 2 cases 24 5 1 3 1 1 Attachment 8-13 Page 1 of 3 PROCEDURE NUMBER 13.14'WP.598 RI (9 aI)REVISION NUMBER PAGE NUMBER 13.14.4-47 of 91 tl y'4 4 4(i~'
ITEMS IN/NEAR OECON STORAGE TRAILER (Continued)
ITEM gUANTITY TLO's Pocket Oosimeter (0-500 mR)Generator Kit (with spare fuses)Gasoline can Syphon Legal pads Pens Clipboards Forms Survey Map and Record Forms Yehicle Contamination Forms Personnel Gontamination Forms After Action Report Emergency Response Log Procedures 4 4 1 1 1'1 box 2 boxes 5 100 10 100 5 1 pad 1 each-EPIP 13.7.5-EPIP 13.7.9,.-EPIP 13.13.4-EPIP 13.14.4-RPI 12.34-RPI 12.36-RPI 12.39-RPI 12.40-RPI 12.53 Oecontamination Operations at Remote Oecontamination Locations Oecontamination Within the Site Boundary Post Incident Reporting Emergency Equipment (located on the'nside of trailer door)Oecontamination of Personnel Self Frisking Release of Material from Radiologically Controlled Areas Radiation/Contamination Surveys Personnel Contamination Survey Attachment B-13 Page 2 of 3 PROCEDURE NUMBER 13.14~4 REVISION NUMBER 9 PAGE NUMBER 13.14.4-48 of 91 YYP 598 Rl (9 83I


CQMTIRQLLEG CQPY INSTRUCTIONS OECON STORAGE TRAILER Location: o South behind the PSF H~onth'I o Check condition of.respirators
ITEHS IN/NEAR AERIAL HONITORING KIT ITEH                      gUANTITY TLD Dosimeter Charger Pocket Dosimeter:
~oarterl (or if seal not intact): Inventory contents Check physical condition of contents and replace as necessary Verify calibration/expiration dates will not be exceeded prior to next quarterly check: o Portable instruments o Chemicals o Iodine Tablets Perform operational checks: o
0-5 R 0-500 mR 0-50R Dose Rate Heter  RO-2A Micro  R  meter                      1 Check Source                          1 Portable Radio Writing Tablet Pens                                  2 KI Tablets                            1 bottle Personnel  Exposure Record Field  Team Haps                    1 set Emergency Response'og                1 pad Procedures                            1 each
                                '-EPIP 13.9.1, Environmental Field  Team  Operations
                                  -EPIP 13.9.2, Field Exposure Rate Survey
                                  -EPIP 13,9.7, Aerial Honitoring Attachment 8-12 Page  1  of  2 PROCEDURE NUMBER    REVISION NUMBER      PAGE NUMBER ~
13.14.4                9                                13.14.4-45 of  91
 
'pj g4
,pi
 
INSTRUCTIONS AERIAL MONITORING KIT Location:
o  Kit    1AM  Emergency      Cabinet Number 4, Headquarters  MPF, 1St Floor,      Room 201 M~onth 1 o  Replace      radio    and    batteries.  (Obtain replacement radio and batteries      from radio/battery charges      uni t in Room 118A cabinet next to decon showers and deliver replaced radio/batteries to Telecommunications for operational check,)
o  Verify all procedures are the current revision and forms are similar to the current revision and have not been written on.
                  ~narterl  (or  if seal    not  intact):
o  Inventory contents o  Check    physical condition of contents      and  replace as necessary o  Verify calibration/expiration dates will not            be exceeded  prior to next quarterly check.
o  Perform operational checks:
o      Portable instrument (battery check)
Attachment 8-12 Page  2 of 2 PROCEDURE NUMBER              REVISION NUMBER        PAGE NUMBER 13.14 '                      9                                  13.14.4-46 of  91 WP 598 R'I (983)
 
ge vA yr jif
 
ITEMS IN/NEAR OECON STORAGE    TRAILER gUANTITY Stanchions                                                    20 Rad. Rope                                                      2 spools Rad. signs w/asst. inserts                                  20 Paper  coveralls                                                4 cases Protective clothing                                            20 sets Rubber boots                                                  10 pair Respirators,  full
Jdi 4 h A%
Jdi 4 h A%
VENTILATION RAOIATION MONITORING HVAC Location: o Emergency Operations Facility (EOF)~earterl o Perform radiological check of HVAC in accordance with RPI 7.45 with assistance from Facilities personnel for verification.
o Oocument this check by signing the tickler card and the data sheet, File 963.5.2.2, in the possession of Radiological Programs.Attachment K PROCEDURE NUMBER 13.14.4 REVISION NUMBER 9 PAGE NUMBER 13.14.4-90 of 91 WP 898 Al (9.88) pig v,q~r$'l k~%, lag FACILITIES SYSTEMS TESTS A.HVAC Location: Emergency Operations Facility (EOF)~ear ter1 Perform electrical check of HVAC in accordance with manufacturers speci fications.
Verify radiological check with assistance from Radiological Program personnel.
Document this check by signing the Data Sheet in possession of Rad.Services.B.'Diesel'Generators Locations:
o Headquarters (Hg)o Emergency Operations Facility (EOF)N~oethl o Perform load test of diesel generators in accordance with manu f acturers spec i f i cati ons.~uarterl o Verify operation of transfer switch in accordance with manufacturers specifications.
Attachment L PROCEOURE NUMBER 13.14.4 REVISIGN NUMBER 9 PAGE NUMBER 13.14.4-91 of 91


144\HI'luell'i tl~I II tIIW~4 SUPPLY SYSTEM PLANT PROCEDURES MANUAL WNP-2 PROCEDURE NUMBER 13.14.9 APP ROY DATE VOLUME NAME 13 SECTION EM RG NCY PL N I T 13.14 SUPPORTING INFORMATION PROCEOURES TITLE 13.14.9 EMERGENCY PROGRAM MAINTENANCE 13.14.9.1~Pur oee This procedure identifies the activities necessary on an on-going basis to maintain a current emergency preparedness program.This procedure is an overview reference and should not be utilized as a substitute for the detailed requirements contained in the referenced documents.
VENTILATION RAOIATION MONITORING HVAC Location:
13.14.9.2 References A.B.C.O.PPH 1.2 Series, Plant Administrative Procedures EPIP 13.14.4, Emergency Equipment EPIP 13.14.S, Emergency Organization EPIP 13.14.7, Emergency Training EPIP 13.14.8, Ori lls/Exercises F.10CFRSO, Appendix E, Section IV, F 13.14.9 WP 597 R3 (2/88)REVISION NUMBER PAGE NUMBER 13.14~9-1 of 7 P
o    Emergency Operations    Facility  (EOF)
13.14.9.3 Procedure Res onsibi lit Action Manager, Emergency Planning.1.Coordinate, as appropriate, with the WNP-2 Health Physics/Chemistry Manager, and Emergency Center Directors, to implement.the requirements oF Attachment A, Topics Requiring Periodic Review or Action.2.Notify the Manager, Health Physics/Chemistry of any condition which would preclude or interfer with the ability of the Supply System to respond to emergency conditions.
                      ~earterl o    Perform radiological check of HVAC in accordance with RPI 7.45 with assistance    from Facilities personnel for verification.
Manager, Health Physics/Chemistry and Emergency Center Directors 3.Coordinate, as appropriate, with the Mana-ger, Emergency Planning to implement the requirements of Attachment A, Topics Requir-ing Periodic Review or Action.4.Notify the Manager, Emergency Planning of any condition which would preclude or interfere with the ability oF the Supply System to respond to emergency conditions.
o    Oocument    this check by signing the tickler card and the data sheet, File 963.5.2.2, in the possession of Radiological Programs.
13.14.9.4 Attachments A.Topics Requiring Periodic Review or Action PROCEDURE NUMBER 13.14.9 WP 59B R1 (9 83)REVISION NUMBER PAGE NUMBER 13.14.9-2 of 7 g i': rr.
Attachment    K PROCEDURE NUMBER                  REVISION NUMBER    PAGE NUMBER 13.14.4                      9                             13.14.4-90 of 91 WP 898 Al (9.88)
g I~CQNIQLLED CQPY TOPICS RE UIRING PERIODIC REVIEW OR ACTION To ic Res onsibilit~Fee uenc Sco e 1.WNP-l, 2 Emergency Preparedness Plan Review Nanager, Emergency and WNP-2 Manager, Kealth Physics/Chemistry Annual (After the Major exer-cise and before the next years ma Jol'xercise)
 
Utilize guidance From PPN 1.4.5, to coordinate review, revision, approval, and issuance of the plan to incorporate changes resulting from new regulations, cri tiques of drills/exercises, audit findings, and corments From personnel/
pig v,q~r$
agencies inside and outside the Supply System.Insure that the Washington State Department of Emergency management, the Benton/Franklin County Department of~Emergency Management, and the Department of Energy-Richland Operations are con-tacted early in the review/revision process and that their corrrnents are solicited.
'l k~%, lag
and considered for input into the process.Assure a 10CFR50.59 review is completed in accordance with PPN 1.4.5.Ensure the supporting documen-tation is submitted to POC consistent with the proposed change.2.WNP-2 Emergency Plan Implementing Procedures Nanager, Emergency Planning and WNP-2 Manager, Health Physics/Chemistry As Necessary (at least once every two years For each EPIP)Utilize guidance Fram the PPN 1.2 Series to coordinate reviews, revisions, and deviations required by revisions to the Emergency Plan or other requirements such as Findings from drills/exercises and audits.Insure deviations are placed in all locations where they are likely to be used.Insure that revisions affecting ofFsite response are coordinated with the appropriate agencies.3.WNP-2 Emergency Plan Manager, Emergency Implementing Planning Procedures Telephone Numbers quarterly Review and document telephone numbers in emergency procedures.
 
4.Emergency Action Manager, Emergency Annually Level Review Planning Insure officials Fram the State of Washington, Benton and Franklin counties and DOE-RL are afforded the opportunity to review the EALs (EPIP 13.l.1).Attachment A Page 1 of 5 PROCEDURE NUMBER 13.14.9 wP 598 Al I HQI REVISION NUMBER PAGE NUMBER 13.14.9-3 of 7 I
FACILITIES    SYSTEMS TESTS A. HVAC Location:
CQNIQLLED CQPY TOPICS RE UIRING PERIOOIC REVIEW OR ACTION (Continued)
Emergency Operations        Facility    (EOF)
To ic Res onsibi lit~Fee uenc Sco e 5.Agreement Letters Manager, Emergency Planning Annually Coordinate review and revision (as neces-sary)of Agreement Letters.Maintain File of current agreement letters for inclusion in next annual revision of the Emergency Plan.Insure involved agencies are contacted to request their input to this review process.6.Emergency Organiza-Manager, Emergency tion Assignment List Planning guar terly quarterly (or after substantial change)l.Maintain in accordance with EPIP 13.14.5"Emergency Organization".
                ~ear ter1 Perform      electrical check            of    HVAC  in   accordance    with manufacturers speci fications.
2.Coordinate review, revision, approval, and issuance of current version.7., Emergency Training Manager, Emergency Planning I)uarterly 1.Review status of Emergency Organiza-I (or more tion personnel training.Frequently as necessary)
Verify radiological          check    with assistance      from Radiological Program personnel.
As applicable 2.Review and approve new/revised Emergency Training modules.3.Insure revisions to EPIP's are circu-lated for review of out-of-plant Supply System Emergency Organization personnel per EPIP 13.14.7"Emergency Training".
Document this check by          signing the Data Sheet in possession          of Rad. Services.
8.Notification Call-Trees Manager, Emergency Planning guar ter ly Review notifications Call-Trees to insure they are current and correct.Emergency Center Oirectors I)uarterly Ensure that center call trees are updated and current.Forward copy to Manager of FP and EW programs.9.Emergency Equipment Manager, Emergency Monthly and Supplies Planning Review status of task performance required by EPIP 13.14.4"Emergency Equipment".
B.   'Diesel'Generators Locations:
Attachment A Page 2 of 5 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER VIP 598 Rl (980)13.14.9-4 of 7 TOPICS RE UIRING PERIOOIC REVIEM OR ACTION (Continued)
o    Headquarters    (Hg) o    Emergency Operations        Facility    (EOF)
To ic Res onsibilit~Fre uenc Sco e 10.Emergency Facilities Emergency Center Oirectors Insure that all modifications to any of the Supply System's Emergency Centers-are documented and approved by the Manager of Emergency Planning.ll.Outy Rosters (for pager holders)Nanager, Emergency Meekly Planning Insure issuance of current duty rosters providing 24 hour per day availability of key Emergency Organization Personnel.
N~oethl o    Perform    load  test of diesel          generators    in accordance    with manu facturers    spec i f i cati ons.
Monthly Obtain and post in the MNP-2 Control Roan, the duty roster for HEHF duty physician.
              ~uarterl o    Verify operation of transfer                  switch  in    accordance    with manufacturers    specifications.
12.Annual Audi t Manager, Emergency Annually Planning Insure an annual audit, meeting MNP-2 Technical Specification requirements, is conducted.
Attachment      L PROCEOURE NUMBER            REVISIGN NUMBER      PAGE NUMBER 13.14.4                      9                                        13.14.4-91 of  91
The audit is to include the Emergency Plan and Imple-menting Procedures, training, readi-ness testing, equipment, and inter-.faces with state and local governments.
 
Annually Insure the repor t on the annual audit is submitted to the Oirector, Support Services for evaluation and resolu-tion of findings.As Necessary 3.Insure that corrective actions needed by the Supply System are tracked to completion.
144\HI'luell'i tl ~ I II tIIW 4
Annually 4.Insure the results of the review and recarmendations are forwarded to"appropriate corporate and plant managers and that the portions pertinent to interface with the state and counties are available to those jurisdictions.
                                                                                            ~
As Appropriate 5.Insure that the report and recom-mendations are retained for a minimum of five years.Attachment A Page 3 of 5 PROCEDURE NUMBEA 13;14.9 REVISION NUMBEA PAGE NUMBEA 13.14.9-5 of 7 WP.59r 81 (9.83)
SUPPLY SYSTEM PLANT PROCEDURES MANUAL WNP-2 PROCEDURE NUMBER              APP ROY                                          DATE 13.14.9 VOLUME NAME 13            EM RG NCY PL N        I        T SECTION 13.14         SUPPORTING  INFORMATION PROCEOURES TITLE 13.14.9       EMERGENCY PROGRAM MAINTENANCE 13.14.9.1      ~Pur  oee This procedure        identifies the activities                  necessary on an on-going basis to maintain      a  current emergency preparedness                      program. This procedure is an overview reference and should not be utilized as a substitute for the detailed requirements contained in the referenced documents.
N+A CQNIQLLEDl."QPY TOPICS RE UIRING PERIODIC REVIEW OR ACTION" (Continued)
13.14.9.2      References A. PPH    1.2 Series,   Plant Administrative Procedures B. EPIP    13.14.4, Emergency Equipment C. EPIP    13.14.S, Emergency Organization O. EPIP    13.14.7, Emergency Training EPIP    13.14.8, Ori lls/Exercises F. 10CFRSO,      Appendix E, Section IV,        F REVISION NUMBER    PAGE NUMBER 13.14.9                                                                           13.14 9-1 of
To ic Res'nnsibilit
                                                                                                      ~      7 WP 597 R3 (2/88)
~Fre cene Sco e 13.Ori ll/Exercise Program Nanager, Emergency Annually Planning 1.Prepare and issue a drill/exercise program schedule in accordance with EPIP 13.14.8"Ori lls/Exercises".
 
2.Review/revise multi-year exercise program to insure compliance with Attachment A of EPIP 13.14.8"Drills/Exercises" and 10CFR50, Appendix E, Section IV F.As Necessary 3.Insure that corrective action records are completed for each dl ill/exercise critique item requiring action by the Supply System.4.Maintain record copies of drill/exercise packages.5.Maintain a running log of all drills and excerises conducted during the year.6.Coordinate implementation of EPIP 13.14.8"Orills/Exercises" to ensure all requirements are met.Monthly 7.Review status of all open corrective action records and aggressively pursue any delinquent responses.
P 13.14.9.3    Procedure Res  onsibi lit                                    Action Manager,  Emergency              .1. Coordinate, as appropriate, with the WNP-2 Planning                                  Health    Physics/Chemistry    Manager,   and Emergency Center Directors, to implement        .
14.Emergency Planning Manager, Emergency Staff qualifications Planning As Necessary Insure all Emergency Planners maintain their professional qualifications by periodic attendance of industry seminars and courses and through observation of and participation in emergency exercises conducted at other facilities.
the requirements oF Attachment A, Topics Requiring Periodic Review or Action.
15.Evacuation Time Studies-Manager, Emergency Planning Annually Review and update as necessary.
: 2. Notify    the  Manager,     Health    Physics/
16.Population Studies Nanager, Emergency Planning Annually Review and update as.necessary.
Chemistry of any condition which would preclude or interfer with the ability of the Supply System to respond to emergency conditions.
Attachment A Page 4 of 5 PROCEOURE NUMBER 13.14.9 REVISION NUMBER PAGE NUMBER 13.14.9-6 of 7 WP-598 Al (9 83)
Manager, Health Physics/           3. Coordinate, as appropriate, with the Mana-Chemistry and Emergency                   ger, Emergency Planning to implement the Center Directors                          requirements of Attachment A, Topics Requir-ing Periodic Review or Action.
: 4. Notify the Manager, Emergency Planning of any condition which would preclude          or interfere with the ability oF the Supply System to respond to emergency conditions.
13.14.9.4    Attachments A. Topics Requiring Periodic Review or Action PROCEDURE NUMBER                  REVISION NUMBER    PAGE NUMBER 13.14.9                                                      13.14.9-2 of  7 WP 59B R1 (9 83)
 
g i': rr.
 
g      I    ~
CQNIQLLED CQPY TOPICS RE UIRING PERIODIC REVIEW OR ACTION To ic                Res  onsibilit        ~Fee uenc                            Sco e
: 1. WNP-l, 2 Emergency      Nanager,  Emergency    Annual          Utilize  guidance From    PPN  1.4.5, to Preparedness  Plan       and WNP-2 Manager,      (After the      coordinate review, revision, approval, Review                  Kealth Physics/         Major exer-    and issuance of the plan to incorporate Chemistry              cise and        changes  resulting from    new  regulations, before the     cri tiques of drills/exercises, audit next years      findings,   and corments From personnel/
ma              agencies    inside  and outside the Supply Jol'xercise)
System. Insure   that the Washington State Department      of Emergency management, the Benton/Franklin County Department of        ~
Emergency Management, and the Department of Energy-Richland Operations are con-tacted early in the review/revision process    and    that their corrrnents are solicited. and considered for input into the process. Assure a 10CFR50.59 review is completed in accordance with PPN 1.4.5. Ensure the supporting documen-tation is submitted to POC consistent with the proposed change.
: 2. WNP-2 Emergency  Plan  Nanager,    Emergency    As Necessary    Utilize  guidance Fram the      PPN  1.2 Series Implementing            Planning and WNP-2      (at least      to coordinate reviews, revisions, and Procedures              Manager, Health          once every      deviations required by revisions to Physics/Chemistry        two years For the Emergency Plan or other requirements each EPIP)      such as Findings from      drills/exercises and  audits. Insure deviations are placed in all locations where they are likely to be used. Insure that revisions affecting ofFsite response are coordinated with the appropriate agencies.
: 3. WNP-2 Emergency  Plan  Manager,   Emergency   quarterly       Review and document telephone numbers          in Implementing            Planning                                emergency procedures.
Procedures Telephone Numbers
: 4. Emergency Action      Manager, Emergency      Annually        Insure officials Fram the State of Level Review            Planning                                Washington, Benton and Franklin counties and DOE-RL are afforded the opportunity to review the    EALs (EPIP 13. l. 1).
Attachment          A Page  1  of     5 PROCEDURE NUMBER                      REVISION NUMBER          PAGE NUMBER 13.14.9                                                                    13.14.9-3 of        7 wP 598 Al I HQI
 
I CQNIQLLED CQPY TOPICS RE UIRING PERIOOIC REVIEW OR ACTION (Continued)
To  ic              Res onsibi lit        ~Fee uenc                          Sco e
: 5. Agreement  Letters      Manager,  Emergency    Annually        Coordinate review and revision (as neces-Planning                              sary) of Agreement Letters. Maintain File of current agreement letters for inclusion in next annual revision of the Emergency Plan. Insure involved agencies are contacted to request their input to this review process.
: 6. Emergency Organiza-     Manager, Emergency     guar terly      l. Maintain in accordance with EPIP tion Assignment List Planning                                      13. 14.5 "Emergency Organization".
quarterly      2. Coordinate review, revision, (or after          approval, and issuance of current substantial        version.
change)
I 7., Emergency  Training    Manager, Emergency     I)uarterly      1. Review status    of Emergency Organiza-Planning              (or more            tion personnel training.
Frequently as necessary)
As  applicable  2. Review and approve new/revised Emergency Training modules.
: 3. Insure revisions to EPIP's are circu-lated for review of out-of-plant Supply System Emergency Organization personnel per EPIP 13. 14.7 "Emergency Training".
: 8. Notification            Manager, Emergency    guar  ter ly    Review  notifications Call-Trees to insure Call-Trees              Planning                              they are current and correct.
Emergency Center       I)uarterly      Ensure  that center call trees are updated Oirectors                             and current. Forward copy to Manager of FP and EW    programs.
: 9. Emergency Equipment    Manager, Emergency     Monthly        Review  status of task performance and Supplies            Planning                               required by EPIP 13. 14.4 "Emergency Equipment".
Attachment      A Page  2 of  5 PROCEDURE NUMBER                  REVISION NUMBER        PAGE NUMBER 13.14.9-4 of      7 VIP 598 Rl (980)
 
TOPICS RE UIRING PERIOOIC REVIEM OR ACTION (Continued)
To  ic              Res  onsibilit        ~Fre uenc                          Sco e
: 10. Emergency  Facilities  Emergency Center                      Insure that all modifications to any of Oirectors                              the Supply System's Emergency Centers-are documented        and   approved by the Manager of Emergency Planning.
ll. Outy Rosters            Nanager,  Emergency    Meekly        Insure issuance of current duty rosters (for pager holders)    Planning                              providing    24 hour per day availability of key Emergency Organization Personnel.
Monthly        Obtain    and    post in the MNP-2 Control Roan,    the   duty roster for HEHF duty physician.
: 12. Annual Audi t          Manager, Emergency      Annually            Insure an annual audit, meeting MNP-2 Planning                                    Technical Specification requirements, is conducted. The audit is to include the Emergency Plan and Imple-menting Procedures, training, readi-ness testing, equipment, and inter- .
faces with state and local governments.
Annually            Insure the repor t on the annual audit is submitted to the Oirector, Support Services for evaluation and resolu-tion of findings.
As Necessary  3. Insure that corrective actions needed by the Supply System are tracked to completion.
Annually       4. Insure the results of the review and recarmendations are forwarded to "appropriate corporate and plant managers    and that the portions pertinent to interface with the state and counties are available to those  jurisdictions.
As Appropriate 5. Insure that the report and recom-mendations are retained for a minimum    of five years.
Attachment    A Page  3  of 5 PROCEDURE NUMBEA                    REVISION NUMBEA        PAGE NUMBEA 13;14.9                                                                  13.14.9-5 of      7 WP.59r 81 (9.83)
 
N +A CQNIQLLED l."QPY TOPICS RE UIRING PERIODIC REVIEW OR ACTION (Continued)
To ic              Res  'nnsibilit        ~Fre cene                        Sco e
: 13. Ori ll/Exercise        Nanager,    Emergency    Annually      1. Prepare and issue a drill/exercise Program                Planning                                  program schedule in accordance with EPIP 13. 14.8 "Ori lls/Exercises".
: 2. Review/revise multi-year exercise program to insure compliance with Attachment A of EPIP 13. 14.8 "Drills/Exercises"    and 10CFR50, Appendix E, Section IV F.
As Necessary 3. Insure that corrective action records are completed for each dl ill/exercise critique item requiring action by the Supply System.
: 4. Maintain record copies of      drill/
exercise packages.
: 5. Maintain a running log of all drills and excerises conducted during the year.
: 6. Coordinate implementation of EPIP
: 13. 14.8 "Orills/Exercises" to ensure all requirements are met.
Monthly      7. Review status of all open corrective action records and aggressively pursue any delinquent responses.
: 14. Emergency Planning    Manager,    Emergency    As Necessary Insure  all  Emergency Planners  maintain Staff qualifications Planning                                their professional qualifications by periodic attendance of industry seminars and   courses   and   through observation   of and participation in     emergency exercises conducted at other     facilities.
: 15. Evacuation Time       Manager, Emergency       Annually     Review and update as necessary.
Studies-              Planning
: 16. Population Studies     Nanager,   Emergency     Annually     Review and update as .necessary.
Planning Attachment     A Page 4   of 5 PROCEOURE NUMBER                    REVISION NUMBER          PAGE NUMBER 13.14.9                                                                 13.14.9-6 of       7 WP-598 Al (9 83)
 
TOPICS RE UIRING PERIODIC REVISI OR ACTION (Continued)
TOPICS RE UIRING PERIODIC REVISI OR ACTION (Continued)
To ic Res onsibi lit~Fre uenc Sco e 17.Nedia Briefing Nanager, Emergency Annual ly Planning Insure annual media briefing is conducted.
To ic               Res onsibi lit         ~Fre uenc                       Sco e
1B.Public Information Nanager, Emergency Planning Annually Insure preparation and distribution of public information occurs.19.Supply System Telephone Directory Nanager, Emergency Planning quarterly Distribute this directory to holders of Emergency Telephone Directory For insertion into the appropriate section.20.Emergency Telephone Directory Nanager, Emergency Planning Annually Review, revise as necessary and distrib-ute directory.
: 17. Nedia   Briefing         Nanager, Emergency       Annual ly   Insure annual media     briefing is Planning                              conducted.
21.Early Naming Systems Nanager, Emergency Planning Annually Generate report to FENA on Siren System availability.
1B. Public Information       Nanager,   Emergency     Annually     Insure preparation and distribution of Planning                              public information occurs.
Perform a coverage survey of Emergency Broadcast System warning effectiveness For a portion oF the covered area.Rotate such that all areas are surveyed within a four year period.Annual ly Nail 9-volt batteries to site neighbors having FN emergency alert radios.Review radio list for neighbors with AN radios.Arrange for battery',changeout if they have had For longer>than 3.5 years.22.Emergency Classifi-cation Notification List, EPIP 13.F 1 Attachment B Nanager, Planning Emergency quarterly (and as necessary)
: 19. Supply System           Nanager,   Emergency     quarterly   Distribute this directory to holders Telephone Directory      Planning                            of Emergency Telephone Directory For insertion into the appropriate section.
Review notification list at the EOF Comnunications Center (EOFCC)to ensure point of contact phone numbers are current.Correct as necessary.
: 20. Emergency Telephone     Nanager,   Emergency     Annually     Review, revise as necessary     and distrib-Directory                Planning                              ute directory.
Attachment A Page 5 of 5 PROCEDURE NUMBER 13.14.9 WP 588 RI (983)REVISION NUMBER PAGE NUMBER 13.14.9-7 of 7 t'0 l l 4'1 e)r(II'}}
: 21. Early Naming             Nanager,   Emergency     Annually   Generate report to     FENA on Siren System Systems                  Planning                              availability.
Perform a coverage survey of Emergency Broadcast System warning effectiveness For   a   portion oF the covered area.
Rotate such that all areas are surveyed within   a four year period.
Annual ly   Nail 9-volt batteries       to site neighbors having FN emergency   alert radios.
Review radio     list for   neighbors with AN radios. Arrange   for battery ',changeout if they have     had   For   longer >than 3.5 years.
: 22. Emergency   Classifi-   Nanager,   Emergency     quarterly   Review   notification   list at the EOF cation Notification      Planning                  (and as    Comnunications Center (EOFCC) to ensure List,  EPIP 13.F 1                                necessary)  point of contact phone numbers are Attachment  B                                                current. Correct as necessary.
Attachment       A Page   5 of   5 PROCEDURE NUMBER                      REVISION NUMBER          PAGE NUMBER 13.14.9                                                                   13.14.9-7 of       7 WP 588 RI (983)
 
t' 0 l '1 l
4 e
) r(
II '}}

Latest revision as of 06:49, 4 February 2020

Revised Epips,Including Rev 8 to 13.8.2,Rev 10 to 13.10.9, Rev 8 to 13.11.13,Rev 8 to 13.14.1,Rev 6 to 13.14.3,Rev 10 to 13.14.4 & Rev 7 to 13.14.9
ML17286A497
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/05/1990
From: Peters J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
PROC-901205, NUDOCS 9012130347
Download: ML17286A497 (332)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 9012130347 DOC. DATE: 90/12/05 NOTARIZED: NO DOCKET. 4 FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION PETERS,J.F. Washington Public Power Supply RECIPIENT AFFILIATION System'ECIP.NAME R

//P/pg

SUBJECT:

Rev 8 to Procedures Manual 13.8.2, "Manual Offsite Dose Calculations" & Rev 10 to Procedures Manual 13.10.9.

D DISTRIBUTION CODE: A045D TITLE: OR COPIES RECEIVED:LTR Submittal: Emergency Preparedness Plans, Impel ENCL 2 ment'g SIZE:

Procedures, C NOTES: /

'ECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 PD 1 1 ENG, P. L. 1 1 D

INTERNAL: AEOD/DOA/IRB 1 1 NRR D PEPB9D 1 1 NUDOCS-ABSTRACT 1 1 LE 01 1 1 D EXTERNAL: NRC PDR 1 1 NSIC 1 1 S D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACr THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL 8

f'

-'a X

WhSHlNGTON PUBLlC POWIll 2 SUPP'VSTEM IIVIXROPFlCE MEMOIRAZ%DUM

,90t21202e7 901205

-P R ADOCK 05000397 PDC DATE: December 5, 1990 TOt Distributi FROM: J. f. Pet , Plant Administration, WNP-2 (927S)

SUBJECT WNP-2 PLANT PROCEDURES MANUAL " VOLUME 13 PACKAGE NO. 90"318

REFERENCE:

PPM *1.2.4 The following Procedures have been revised/approved and are to be inserted in your controlled copy of Volume 13 of the Plant Procedures Manual, and the superseded revisions are to be removed and destroyed:

Procedure Rev ~ Title 13.8.2 8 Manual Offsite Dose Calculations 13.10.9 10 Operations Support Center Operations and Operations Support Center Director Duties 13.11.13 8 . EOF News Writing Team Duties 13 '4.1 8 Emergency Exposure Levels/Protective Action Guides 13.14.3 6 Supply System Health Physics Procedures, Radiologi-cal 'rograms Innstructions, and'nvironmental Programs Instructions 13.14.4 10 Emergency Equipment 13.14.9 7 Emergency Program Maintenance To verify receipt and inclusion of these Procedures, please sign, date and return this receipt to S. Le ard, MD 927A within TEN (10) WORKING DAYS of the date of this IOM.

Date . signature o Manua Ho der Contro ed Copy Number JFP/sl Attachments WP.102 AS (440)

ljlSII(MILUH VUlitt. D Control Control lidil

~Co y,Ho. ot~ Location Drop

~Co y No. Location> w~Noil 0 o 57 Benton County Dept of. Energ.'gmt.

2 Control Roan 927A 58 lIP-2 Security 913'13, 3 Shift Manager 927A 60 HHP-2 Security 4 Plant Manager 927M 61 Operations Support Center/Cabinet nichroco>

63 Emergency Training 1020 5 Licensed Training 1022 6 Sioulator 1034 64 Rakaste Control Rocm 927A'034 7 Technical Manager 988U 66 Sinulator, Shift Manager Reoate Shutdae Roan (13.4.1)

'27A 8 Operations Manager 9270 68 69 EOF Cammications Center (EOFCC) 1021 HP/Chanistry lhnager 927K 10 9

Maintenance Manage 927S 73 ~

Dept. ~. 8 llealth Serv.

ll Plant Admin. Manager 927S 74 75 Dept. Soc. 8 Health Serv.

Dept. Soc. & Health Serv.

wg 12 Engineering Services 981G 78 Shift Technical Advisor 927A 17 Central Training Services (Sec. 13.14) '027 80 Plant Records 927A Chemistry Supervisor 927A 1020 82 ECF Decision Center 21 Health Physics Supervisor 927A 1020 83 l"lNAC 24 Plant gA/()C Manager 9568 Sinulator, Shift Technical Advisor (QA) 86 25 Project Manager, Bechtel 964D, - Document Control Desk, HRC Hash D.C 87 26 Region V, HRC Corporate Camunications 325 90 27 Security Programs thnager 1021 91 Energency Preparedness Program 1020 28 Region Y, HRC 92 Energency Preparedness Program 1020 29 LIP-3 Technical Library 700 93 Radiological Programs 1020 30 E.O.F. RecorddRoan ~

1020 94 Offsite Agency Center 1020 31 TSC Emergency Response/Cabinet 927A 95 Security Decision Center 1020 33 Adnin. Security Specialist 968 96 Crisis Managenent Center 325.

34 HP Technicians Office 927H 97 Technical Data Center -i 1020 35 Resident Inspector 901A 98 Corporate Library 330 36 Emergency Preparedness Program 1020 102 Telecamunication Services 1032 37 Ngr. of Emerg Plann & Environ Prog 1020 104 . Energency Preparedness Program 1020 41 913 105 HRC Grergency Response 1020 HHP-2'Security'lhintenance 42 Training 184 106 Energency Preparedness Program 1020 46 IS&FP 9828 ,114 Energency Training 1020 47 Director Engineering 520 123 Planning 8 Scheduling 994E 49 Security Training/Evaluation 1021 126 Asst. Managing Director for Operations 1023 50 Plant Enargency Director 927A 127-132 (6) Licensed Training 1020 51 Energy Fac. Site Eval. Council ~ 133 Eoergency Planning 1020 52 Division of Energency thnayment 134-136 (3) t4$ AC Field Team Kits (13.9 series, 53 Dept. Soc. & Health Serv. I/ 13.13.4 and 13.14.4) 54 Dept. Soc. 8 Health Serv. (Seattle) 137-140 (4) tVF Field Team Kits (13.5.4, 13.7.5, 1020 Federal Energency Mgmt. Agency ,13.9 series, 13.13.4, and 13.14.4) 56 U.S'. Department of Energy 142, Pacific H.M. Labs H/A Kathy t4Grllamh (tenn Onlv) 917Y

<<h wAININO'ICN ~ U ~ slc eowem 4P SUPPLY SYSTEM PLANT PROCEDURES MANUAL WNP-2 PRPCEOURE NUMBER APPROVE OATE i13.8.2 03/29/90 VOI.UME NAME 18% EMERGENCY PLAN I LEMENTING PROCEDURES SECTION

,13.8 OFFSITE DOSE CALCULATIONS TITI.E 13.8.2 ONUAL. OFFSITE DOSE CALCULATIONS 13.8.2.1 ~pur ose The purpose of this rocedure is to provide instructions on using redun-dant EDPS Computer pr grams to predict off ite dose rates and integrated doses for populations downwind of WNP-2 during an emergency. These calculations are based u on actual meteg(ological data and the actual or projected airborne relea e rates. TP'is procedure is limited to the airborne pathway, since it 's considered the only credible release mode.

This procedure can be utilized by the Control Room, Technical Support Center, or fiUOAC dose assessmeiIt 'ersonnel, if the Computerized Emergency Dose Projection System is not op rational, or if desired. The dose rates calculated from thi's procedure should be confirmed by actual Environmental r Field Team Measureme'nts as soo as practicable.

13.8.2.2 References L

EPIP 13.8.1, Computerized Emergency Dos Projection System Operations (

~II ~

13.8.2.3 Procedure I

Res onsibi lit Action Assigned Dose Assess ent 1. Perform this prooydure if the Emergency Dose Personnel Projection Systems EDPS) is inoperable, and (Radiological Emergency an Alert, Site Area or General Emergency in-Manager, Radiation cluding a release ha been declared, or when Protection Manager, Shift directed by the Radio qgical Emergency Mana-Technical Adviser or ger, Radiation Protec&'on Hanager or Plant other assi,gned Emergency Director.

individua'Is)

PROCEOURE NUMBER REVISION NUMBER PAGE NUMBER 13.8.2 7 13.8.2-1 of 9 WP.597 R3 I2/86)

E I r

4 j

I

Res onsibilit Action Assigned Dose Assessment 2. Utilize the TRS-80 Model 100 micro-computer, Personnel (Radiological or IBM PS/2 as the redundant Emergency Dose Emergency Manager, Radiation Projection System (BEDPS) The TRS-80 is Protection Manager, Shift stored in the STA's office, the TSC, or the Technical Adviser or other MUOAC. The TRS-80 Model can be operated on assigned individuals) (Cont.) four (4) AA batteries or adapted to 120 VAC.

IBM PS/2s loaded with BEOPS are located in the Control Room, the TSC and MUDAC.

3. Turn on the computer and select the program from the menu.
a. .

TRS-80 Model 100

1) Turn the power switch ON. (The switch is on the right side of the computer.)
2) Adjust the display intensity

'sing the control "OISP" next to the power switch.

3) Press the space bar until the cursor is over "BEOPS.BA" on the menu.
4) Press "ENTER". The program will load and start asking interactive questions.
5) Whenever possible, operate computer using available 120 VAC power and minimize battery use.
b. In the event that BEOPS.BA has been lost From the TRS-80 Model 100's memory, the program can be reloaded from the magnetic tape cassette stored with the TRS-BO.
1) Connect the tape recorder/player to the TRS-80 using the supplied cable.
2) Turn on the TRS-80. Set tape recorder volume control to "P".

PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.8.2 7 13.8.2-2 of 19 iVP 59II R1 (9 aI)

Res onsibi lit Action Assigned Dose Assessment 3) Insert the cassette containing the Personnel (Radiological BEOPS.BA program and rewind. Reset Emergency Manager, Radiation tape counter to "000".

Protection Manager, Shift Technical Adviser or other Hake sure that the recorder/player assigned individuals) (Cont.) is set for remote control.

(" Pause" set to "Out")

5) Press the PlAY key and be sure that it locks down.
6) Access BASIC from the Main Menu of the TRS-80 (position cursor over BASIC and press ENTER).
7) Type CLOAD "BEDPS" and press ENTER.
8) The TRS-80 will search the, tape for BEOPS.BA and print the names of any files it passes over.

Once BEDPS.BA is loaded, the TRS-80 will print OK.

9) Type SAVE "BEDPS.BA". Stop tape recorder, rewind tape, remove tape and disconnect tape recorder.

C. IBH PS/2 (HUOAC)

Enter menu number For BEOPS selection.

2) Ensure laser printer is on.
3) Read and follow instructions shown on screen.
4) Default values must be entered.
5) If needed, a backup disk for the PS/2 is located in PSF Room 129F.
6) Nhen a Full page is not produced by the laser printer, you must eject the partial page before you begin another set of calculations.

PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.8.2-3 of 19 VitP 598 Rl I9 83)

CQNTIROLLED COPY Res onsibi lit Action Assigned Oose Assessment 4, Complete Attachment A, "Offsite Oose Calcu-Personnel (Radiological lation Oata Sheet". See Attachment 8 for Emergency Hanager, Shift instructions on each individual question or Technical Adviser or other entry.

assigned individuals)(Cont.)

5. Using the information on the data sheet answer the questions as they appear on the computer screen. Always press "ENTER" after answering each question.
6. At the completion of the program a "Summary of Ooses" will be displayed.
7. Copy the results onto Attachment C, "Summary of EOPS Backup Calculation".
8. Perform calculations for 1.2, 2.0, .3.0 +,

5.0 and 10 miles downwind. Perform calcu-lations for any other distance downwind, as needed.

+ NOTE: Also calculate 3.0 miles due to i rregul a ri t i es o f 2. 0 mi 1 e boundary.

9. Refer to EPIP 13.14.2, "Process for Oeter-mining Protective. Action Recommendations".

Initiate protective actions as required.

10, Attachments 0, E, F and G contain blank copies of the 10 mile maps for a) Whole Body Oose Rates, b) Whole Body Integrated Oose, c) Thyroid Oose Rate, and d) Thyroid Integrated Oose.

Hark the calculated doses at the correct distances and in the downwind direction on all four maps. Indicate the centerline of the plume by a line on each map in the down-wind direction. Label "Plume Centerline".

ROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13,8.2 7 13.8.2-4 of 19 wP 59B Rl (9 83)

E C 'Y '

Res onsibi lit Action Assigned Oose Assessment 12. Include the maps with any recommendation for Personnel (Radiological protective action recommendations made off-Emergency Manager, Shift site using EPIP 13.14.2, "Process for Oeter-Technical Advisor or other mining Protective Action Recommendations".

assigned individuals) (Cont.)

13. Maintain copies of all calculations, 'maps and Protective Action'ecommendations made using this procedure.

14, Evaluate the need to update the dose assess-ment calculations if ~an of the following parameters change significantly (e.g., by 20$ or more):

a. Elevated release point monitors.
b. Radwaste ventilation monitors.
c. Turbine building ventilation monitors.
d. Containment radiation level.
e. Measured effluent flow rate.
f. Containment pressure.
g. Wind speed ~
h. Wind direction (change of 22.5 degree sector) .
i. Pasquill stability class.
1) Temperature Lapse Rate.
2) Sigma theta.
j. Estimated duration of release.

PROCEOURE NUMBER REVISION NUMBER PAGE NUMBER 13.8.2 7 13.8.2-5 of 19 WP 598 Rl Ig.aI)

CQNTIRQLLF.G CQPY 13.8.2.3 Attachments A. Offsite Dose Calculation Data Sheet.

B. Instructions for Offsite Dose Calculation Data Sheet.

C. Summary of EQPS Dose Calculations.

D. 10 Nile Nap Whole Body Dose Rate.

E. 10 Nile Nap Whole Body Integrated Dose.

F. 10 Nile Nap - Thyroid Dose Rate G. 10 Nile Nap - Thyroid Integrated Dose Radwaste Building Exhaust Flow - Millivolt to CFM Conversion.

PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.8.2 7 13.8.2-6 of 19 WP.598 R1 (9 LII

CONTIROLLED COPY OFFSITE DOSE CALCULATION DATA SHEET DATE: (1)

TIME: (2)

NAME: (3)

CALCULATION: (4)

REACTOR TURBINE RAOWASTE BLDG ORYMELL BLDG BLDG A. Release Point (RX Bldg, ON, TG, RW)

(Y or N) (5)

B. Meteorology

1. Stability Class (A-G) (6) or 4T/ aZ 'C/100m or Sigma Theta Degrees
2. Distance Downwind Miles (7)

(1.2, 2.0, 3.0, 5.0, 10.0 Miles)

3. Mind Speed MPH
4. Nind Direction (From To) Degrees (9)

C. Time Since Reactor Shutdown Minutes (10)

O. Stand By Gas Treatment System (SGTS) Efficiency E. Release Point Flow Rate (CFM) CFH CFH CFH CFH (12)

F. Source Term-Radiation Monitors, Field Data or Sample Results (R, F, or S) (13)

( If source term is based on sample results complete attached sheet)

Reactor Turbine Radwaste

1. Radiation Monitor Reading ~Bl d ~Bl d ~Bl d a ~ High Range Elevated Release Point (R/Hr) R/hr XX XX (14)
b. Intermediate (extended)

Range Noble Gas Monitor (PMU) PMU PHU PMU (15)

C. Low Range Noble Gas Monitor (CPM) CPM CPM CPM (16)

Attachment A Page 1 of 3 PROCEDURE NUMBER REVISION NUMSER PAGE NUMSER 13.8.2 7 13.8.2-7 of 19 WP 598 A I (9 83)

OFFSITE DOSE CALCULATION DATA SHEET (Continued)

Reactor Turbine Radwaste

1. Radiation Monitor Reading ~Bl d ~Bl d ~Bl d
d. Drywell LOCA Rad Monitor

( CMS-R IS-27E) R/hr XX XX

e. Drywell LOCA Rad Monitor

( CMS-RIS-27F) R/hr XX XX

2. Field Data
a. Plume Centerline Dose Rate mR/hr at miles
b. Plume Centerline Air Sample at miles (Comp'lete attached Air Sample Data Sheet)

G. Release Duration (Minutes) min Attachment A Page 2 of 3 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.8.2 8 7 13.8.2-8 of 19 WP 599 Rl (9 8QI

SAMPLE RESULTS FOR GASEOUS RELEASE POINTS 3

CONCENTRATIONS IN Ci/M or Ci/CM (See Attachment 8, Item 20, for instructions)

REACTOR TURBINE NUCLIDE BUILDING DRYWELL BUILDING .

RADWASTE BUILDING

'LUME CENTER LINE PRE-SGTS POST SGTS PRE-HEPA POST-HEPA AT MI Kr-83M Kr-85M Kr-85 Kr -87 Kr-88 Kr-89 Xe-1 31M Xe-133M Xe-133 Xe-135M Xe-135 Xe-137 Xe-138 I-131 I-132 I-133 I-134 I-135 Attachment A-1 Page 3 of 3 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.8.2 7 13.8.2-9 of 19 WP.599 R1 (9.83)

~. I 0

CONTIRQLLED COPY OFFSITE DOSE CALCULATION DATE SHEET INSTRUCTION

1. Date: Enter current date (mm:dd:yy).
2. Time: hh:mm, a.m. or p.m.
3. Name: Person performing calculation.
4. Calculation g: Sequential Number of calculations performed during current emergency.
5. Release Point: Indicate which building(s). There may be multiple points.

If the release point is the Reactor Building, and the Drywell LOCA rad monitors (CNS-RIS-27E or F) are being used to estimate the source term, mark the Drywell as the release point, not the Reactor Building.

6. Meteorology Conditions: Obtain necessary meteorological data from the plant Graphic Display System (GDS) or:
a. Telephone the PNL Weather Forecaster (Primary) at 373-2875 or:
b. Telephone the National Weather Service Forecaster at:

1-503-281-1911 Portland, Oregan 1-206-526-6083 Seattle, Washington

c. Stability Class vs. hT/hz signal.

Stabi i ty 1 Pasquill Temperature Change Classification Ca~ecaories With Hei ht 'C/100 m Extremely un'stabl e aT/az -1.9 Moderately unstable -1.9 aT/hz -1.7 Slightly unstable -1.7 aT/az -1.5 Neutral -1.5 aT/hz -0.5 Slightly stable -0.5 aT/az 1.5 Moderately stable 1.5 aT/az 4.0 Extremely stable 4.0 aT/az Attachment 8 Page 1 of 4 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.8.2 7 13.8.2-10 of 19 Wp 598 R1 I9 aI)

CQNTRQLLED CQPY OFFSITE DOSE CALCULATION DATE SHEET INSTRUCTION (Continued) .

d. Stability Class vs. Sigma Theta. Signal Stability Pasqui ll Classification ~Cate aries de rees Extremely unstable A sigma theta 22.5 Moderately unstable 8 22.5 sigma theta 17.5 Slightly unstable C 17.5 sigma theta 12.5 Neutral D ~

12.5 sigma theta 7' Slightly stable E 7.5 sigma theta 3.8 Moderately stable F 3.8 sigma theta 2.1 Extremely stable G 2.1 sigma theta Distance Downwind: 1.2 miles is the exclusion area boundary.

and 10.0 miles are the increments for population evacuatation.

2.0, 3.00 I Example: If the Dose Rate at 2 and 3 miles are above the Protective Action Guide (EPIP 13.14.1 and 2) but below it at 5 miles then shelter or evacuate that downwind sector(s) to five miles.

8. Hind speed: Enter in miles per hour.

. 9. Hind Direction: Enter direction from and to in degrees 0-360o.

10. Time Since Reactor Shutdown: Time in minutes since reactor went subcri-tical. (Used to calculate decay of radioactivity.)

ll. Standby Gas Treatment System (SGTS) Efficiency (in percent):

a. If ON, use 99.7
b. If OFF, use 0
12. Ventilation Flow: In cubic feet per minute (CFM).

Defaul t .Va 1 ues:

RX 120,000 CFM normally, 4000 cfm if SGTS on DM 0.725 Leakage/day = (.0072)(3.5E+5 ft. 3

)/24X60 =1.75CFM.

TG - 310,000 CFM RW - 84,000 CFM. - However, if getting Radwaste Building flow from Process Computer units are in millivolts not CFM.

See Attachment H For graph for conversion to CFM.

Attachment B Page 2 of 4 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.8.2 7 13.8.2-11 of 19 wP 598 Rl (9LI)

I

OFFSITE DOSE CALCULATION DATE SHEET INSTRUCTION (Continued)

13. Radiation Source Term: If release rates are being determined by the radiation monitors, mark (R); if they are based on sample results, mark (S); if based on field radioactivity samples or dose rates, mark (F).

Refer to PPN 12.10 series "Post Accident Sampling and Analysis" if source term is based on samples.

14. 'igh Range Elevated Release Point Monitor (CNS-RIS-27C or D) (R/hour).

Enter value if Reactor Buildng is release point.

Use CMS-RIS-27C or 27D. (10 2-104 R/Hr)

15. Intermediate (extended) Range Noble Gas Radiation Monitors - Rx, TG or RW Indicate in Panel Heter Units (PNU).

a ~ Rx REA-RIS-19A (1-10 5 PNU)

b. TG - TEA-RIS-13A (1-10 5 PHU)

C. RW WEA-RIS-14A (1-105 PHU)

16. Low range Noble Gas Radiation Monitors Rx, TG or RW (CPM).

a, Rx-REA-RIS-19 (10-10 7 cpm)

b. TG-TEA-RIS-13 (10-10 7 cpm)
c. RW-WEA-RIS-14 (10-107 cpm)
17. Drywell LOCA Radiation Monitor (R/Hr) Use either one not both.

CHS-RIS-27E (1-107 R/Hr)

CMS-RIS-27F (1-107 R/Hr)

18. Field Data: Enter plume centerline dose rate in mR/hr and distance from Plant to the measurement location. If calculation of dose is to be based on field team radioactivity measurements, enter measurement distance and complete air sample data sheet.
19. Release Duration in- minutes: Length of time the release is expected to last. 120 minutes (two hours) is used as a default value. This is based on approximate time to evacuate a sector to 10 miles.
20. Sample Results Attachment A-1: (Ci/m3 or pCi/cm3).

have been pulled and analyzed for any of the locations, (RX, DW, TG, RW If samples or Plume Centerline) the results may be substituted into the calculations in place of the radiation monitor readings. Complete the 'ppropriate columns in Attachment A-1 listing the concentrations of the thirteen (13) noble gas nuclides and five (5) radioiodines. Enter the concentrations in units of Ci/m3 or ICi/cm3 when asked to by the computer.

Attachment 8 Page 3 of 4 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.8.2 7 13.8.2-12 of 19 WP 59881(983)

v OFFSITE DOSE CALCULATION DATE SHEET INSTRUCTION (Continued)

21. Summary of EDPS Calculations, Attachment C
a. Enter dose rates and exposure as listed by computer output on form.
b. Plume Transit Time = Distance (Ni les) Nindspeed (NPH)

= Plume Transit Time (Hrs)

c. Enter the time the release started. (HH:NN AN or PN)
d. Completed By: Signature of individual completing Attachment C.

Attachment 8 Page 4 of 4 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.8.2 7 13.8.2-13 of 19 WP 598 RI I9 83)

SUMMARY

OF EDPS OFFSITE DOSE CALCULATIONS (See Attachment 8, Item 21, for instructions)

Dist Mhole Body[ Nhole Body Thyroid Thyroid (Plume Transit]

Dose Rate Integrated Dose Rate Dose T i llle REM/Hr Dose REM REM/Hr REM Hrs 1.2 2.0 3.0 5.0 10.0 Other Time Release Started:

Completed By:

(Name)

Attachment C PROCEDURENUMBER REVISION NUMBER PAGE NUMBER 13.8.2 7 13.8.2-14 of 19 WP 59$ R1 (9 83)

!t."QNTRQLLED CQPY 10 MILE EPZ WHOLE BODY DOSE RATE MAP ss t6~+)4+y~ 2'8 4 yy iayml..">> 'I ~d >

'y)TP '-;

,,j)r r4). (( I c(zY".I>kq) Ya 4)ssA SAIS ~ <<<<<<<< '.I) )ISA 5

Ik

'JOY L<< <<<<L O)SISOO I

w P r ROUTE 11A L55 I 8 mi.

N 5 I

)Y. AYSSSI )004

~

/

'4 I I

'q<<'I~'.

Eal tlag.

I<< .",

B B

I

  • 4 tv. >pt 54p i)4; I IISIOOIO SO.

')I+ yr 1g 1Q ml. I 4 y

':lt'r 1

WO~WO~WO 44 y44 SY Im 4)( 0 y

~l444 4 2'  !~ I P;;g.t."2 LTOPIA )NEST IIIL I

'f 4 Sl4 IISI tats.mna I<< I r(,r; 4,"

4(* 4 4'  :~c'2WYIY lg >>IS AO4'-0 It

';, 44~5 y.r4

} X G

'7~'AAyy g IIOAIY)O

'.4( ) I 4

I sII 3 ~ 422)SS

<<<< i <<<<<<<<<<<<

4 Y r [SAN (8(

~ \<<<<

425)405)5 4505 C54

~ 5Y5

~ <<<< <<<<<<<<<<<<<< ~ LEGEND SAYSOSOAO IossOYso soAo as I

~ )1 8 OSAYSL OOAO 55)SS gl SIV555540 Cf. I AASA

<<\<< Ia)tso Istss gl t 0 Oi sas>>I.Y ststtss swea 0 al

~ OSS IASIS SO SIAYS CA&5, OIIO I

7 I EMERGENCY PLAN OICSSCIP 104ltLE ZONE MAP 890985.(001 SI89 REV 1 Attachment 0 PROCEDURE NUMBER REV(S(QN NUMBER PAGE NUMBER 13.8.2 7 13.8.2-15 of 19 WP.598 Rl (9 83(

10 MILE EPZ V/HOLE BODY iNTEGRATED DOSE MAP Si& Sl I Sit g',eg~, .+g

', ( ~FP.,tt'*KM "t<M- t Y&

'hJt Atlt"'gl3 t'( @Yt (y Ty

',IO YA(&slA

&SIOIO&31 AOUTE 11A II I 3

5mi. S&JSSCLL SYL rt(,P. ~'I q&.

I

, gO CASSIA MS I I .tl,ti&~,

'~JASJr,d y r&lc3&&YL y.d',",".-'~ 1X ml.

3+ St&A't t~(

J'3I(Cyst&(It'

(/ YQ' ( ',(&iiW&C&

g$ t CO~SO (

t

'-('P,:13. Ill (I% ELTOPIA WEST AD. I IP Jt; (C Ply I~ rot sLro&(A 113~

Qc', L- 'g,','Oi P "Gi SIJAtAO YJ, JOO&&&

CIJS JYL 3 ~ tsrsll

(&&&W W W &W (Sr ~ JA I 3

t Jt(

Li (Stt&SJ&

JJ&SCN

'W~ ~ W&&WWWW &SYOI JIL ~

w ee LEGEND

&AYCO&OAO Or&OYSO AOAOOO I

t .

C&AYSL&OAO SJJSA I 81 ASIA

&&Alt&SO

&O(33(&A&Y IO(S&

cJJI&ssJ&cr tttsCS(SSA I ~ OS(&& IJJS&&

Ql SSJ&SLY&Y&rtO

,3 COO i&Jill&

(Wit(S( Q L sr&r&&Is&&.&ao CJJ&l 0 oi 8

~ Sl&

SSASAAA

)

EMERGENCY PLAN IJ(t&tt(S tt(3t 104%LE 20NE MAP 890325 10E AJ89 REV1 Attachment E PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.8.2 7 13.8.2-16 of 19 WP N8 Rl 19 83)

10 MILE EPZ THYROID DOSE RATE MAP SII I y qQ". I X ~~ Ifr '~~ -* <<g I Irosssosrroitw w.. -l gl clrY, sA~'Iso ~<

~ WW&W

,'PIIOL l

SIICSS'BIO I

hami. IE II0IITE 11A IE I w.xuuAIIIIYs yak i'fs 4 r "y'j ,,I,QV>jlIAOI..I ',

. "S; 0 I'"Yf)A,III'I>>. 1'+'

+%A (fI'YICl lMsrr" rr I srs SSIONO AO.

1X ml. y' sI I I I

Yf Olwr I E srf~

WO WO~

~ P ELTOPIA WE8Y RD. I I W Al

'f lg IOIILIOPIA rI'+g/~ ~ rKy";

40

, y'<<,'for l

.y

~~ A ISIS AOOSSS 2 O 8 I

I OAI I

S Arlrss r"- wr&&rw& BI V. <;

/v SCOAII

,/

Iffy rf~"

w. ssoosfxw ASIE M .Gi

~ wmm r AOfrAIJS Cw 4 w r AfrsI OIL

~ IACIII%S

&&Mr&& ~

mw LEGEND AAYCO IIOAO I

SOAOYCO AOAOOS OSAYSL SOAO SfrSA AIASIAfOSI.

l1 jl AASA SAIISOAO .

SOWIOAAYISICS I SOIICS Iilrss I r llss lfsfrOOf y3l'- Pi SOSICYSYSICM OSO Irfsisss SAICS Sy Ifs 0 I1SIW O, 'r.'ef 4

STAYS CSCL OISO I OC I aessap rr+ EMEIIGENCY PLAN ps.'qQj r I>> 'Cc'/ 'f '.l, 104%LE ZONE MAP 890325.10f 4/89 REV 1 Attachment F PROCEOURE NUMBER REVISION NUMBER PAGE NUMBER 13.8.2 7 13.8.2-17 of 19 WP 598 RI (980)

10 MILE EPZ THYROID INTEGRATED DOSE MAP 110 011 111 f'vt<<0>>A1>>tLL ~

( <<~g <<If)P>> << "'t~55r~tr, III ft OOS

'~7' MWIILLtifL w It~

VCWSL Wp 1

>><<I O I WXWuQIISL 5<<ag I ~

>>Ã <

>>M gf j' 4 8 ml. ISISSCLLISL I

W&&WWWW

\ ~ 5, >>>>, ~

w ~IO.

3?IIIS I NCNwOCO 5>>

~ Ikrtrrrhb I f&

00 IttrOS00

~i>

I IOSICQQI w. ~>>A", 'tiff>> fy'g 4'P4 >> 1.2 ml. I x,'"- ~4~L'85st 5;

'r,

. >>0" t

)'SJI lewgwlwjg COASS IO. 5 5

t<<r,r gg.,f

/'g',5 5

r if ~ll CLI i.<<0>>4 Li>>44 ELTOPIA W'EST RO. I I

5'0ll1Ql SLlCI5N I000ll0 I,t. qF'-

001 SjL

<<"<<501 WSSl 1011%L I 8 Q

'5

'"r, ~-">>,w "f>>f~t ti gr .))5I 1CCSSS 5<<

0 B $ 01 M.

>>>> I SIIl00 I

m Jmwm~wwawm I

0500T, 0 Y J I+m WWW\ WW 151 I +r CSOJII autrrr N 8 4.

~ +wadi SISCII M.

WWWWW>>'W ~ LEGEND tlrfoso00 0100orSO 1OAO OS

."-.'l 55, 8 00l1101MY IIIISS A + POIISS IIIII~

pi P<<00'rfial CSO SISLSSA awe clio t;5 0 O, srsvs fi r IO

~rig 'I ',C>>t 5>>

EMERGENCY PLAN 104ULE ZONE fiAP 880328.10G 4/89 REV1 Attachment G PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.8.2 7 13.8.2-18 of 19 W? 598 Rl (9 83)

CONmoLLED CopY RAOWASTE 8UILOING EXHAUST FLOW - MILLIVOLT TO CFH CONVERSION 8, Cj I

RAOHASTE BUILOING VEIITILATION uVN:mo-.FuW C~SIe~(MEA-FH-IA, EXHAUST FANS 9..

8 ""

I O

LD C) W C) 6 C) 8 4

5 C7

~ ~ ~ ~ ~ ~ ~. ~ ~ ~ ~ ~

V

~ '

-J, ~ ... ~ ~ ~

le 3 I

l/!

~~

~ 4 y 2

""'- '"' ~ ~ I

~

~

~~

~ 4

~ ~ ~ ~

~

~ '

~

' ~~ ~

~ ~ ~~ ~ ~

1- I

~ ~ ~~ ~ ~ - ~ ~ ~ ~ ~ ~ ~ ~ ~

0 0 9 100 110 120 JI S4MIW lO llew (&tll MILLIVOLTS Attachment H PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.8.2 7 13.8. 2-19 of 19 WP 59881I98Q)

siasns'ssstss\ el eels ~ ow an SUPPLY SYSTEM PLANT PROCf DURES MANUAL WNP-2 PROCEDURE NUMBER DATE 13.10.9 03/22/90 VOLUME NAME 13 EMERGENCY PLAN IMPLEMENTING PROCEOURE SECTION 13.10 PLANT EHERGENCY FACILITIES TITLE OPERATIONS SUPPORT CENTER OPERATIONS ANO 13.10.9 OPERATIONS SUPPORT CENTER OIRECTOR OUTIES 13.10.9.1 ~Pur ose The purpose of this procedure is to describe the responsibilities of the Operations Support Center Oirector and the operation of the Operations Support Center. The Service Building lunchroom will normally serve as the center. If the need arises, the Hechanical Maintenance office space in the Service Building basement can serve as an alternate location for the Center.

13.10.9.2 References A. EPIP 13.5.1, Controlled Evacuation of the Protected Area B. EPIP 13.5.5, Personnel Accou'ntability C. EPIP 13.5.6, Personnel Search and Rescue EPIP 13.7.8, Transportation of Injured or Contaminat:ed Injured Personnel to an Offsite Medical Facility E. EPIP 13.10.12, Reentry Team Outies F. EPIP 13.10.13, Recovery Team Outies EPIP 13.11.18, Information Network EPIP 13.13.4, Post Incident Reporting PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 13.10.9-1 of 32 WP.591 R3 I3/BS)

lag 4

Bl I'

13.10.9.3 Procedure Res onsibilit Action Operations Support Center Upon notification of an Alert, Site Area or Director General Emergency, or if so directed, pro-ceed to the Operations Support Center (OSC) and assume the Director's duties.

2. Obtain appropriate briefing from the Shift Manager (SM) or Plant Emergency Director (PED) on current Plant systems status, locations and task assignments for Plant Emergency Teams (PETs), and known or antici-pated Plant hazards.
3. Determine when adequate staFF and resources are in a state of readiness and the OSC can be declared "ACTIYATED". Announce Acti-vated status to the OSC stafF and direct they assume control for their procedural responsibilities.

Announce OSC activation to the SM, PED, and other Plant emergency centers.

5. Assume control of accountability and direc-tion for any Plant emergency response teams activated by the Shift Manager.

NOTE: If certain Operations personnel (who may be PET members) are needed to complete critical tasks, under Control Room di rec-tion, discuss this with the SM (or PED).

When determined, they will remain under Control Room (rather than OSC) that will be announced to them by the SM (or PED).

6. Direct the initiation of accountability operations per EPIP 13.5.5, "Personnel Accountability.
7. For personnel unaccounted for, initiate search and rescue per EPIP 13.5.6, "Personnel Search and Rescue".
8. Assign administrative support personnel as defined in Attachments 0-1 through 0-13.

PROCEDURE NUMBER REVIStON,NUMBER PAGE NUMBER 13.10.9 9 13.10.9-2 of 32 WP 59B Al (9 ID)

K CQNmQLLED t.QPY Res onsibi lit Action Operations Support Center 9. Maintain a chronology of significant inputs, Director (Cont.) actions, events and their. resolutions on an already established log, or on a log simi-lar to the "Emergency Response Log", for attachment to your After Action R'eport.

See EPIP 13.13.4, "Post Incident Reporting".

10. Ensure habitability monitoring of the OSC has been implemented.

ll. If the OSC becomes uninhabitable:

a. Have the Lead Health Physics Person determine the habitability of the Hechanical Maintenance office space in the Service Building.
b. Relocate select OSC personnel to the alternate OSC and notify the Plant Emergency Director and other center directors of the move.
c. Evacuate non-selected OSC personnel per instructions in EPIP 13.5.1 "Con- .

trolled Evacuation of the Protected Area".

5

12. If a controlled or immediate evacuation is needed, refer to the appropriate section of EPIP 13.5. 5 "Personnel Accountabi 1 i ty" For guidance in accountability for emergency and non-essential personnel.
13. Direct the OSC Information Coordinator to transmit announcements over the information network that personnel in other centers-should know.
14. Ensure that the Significant Events Status Board, similar to Attachment B, and other status boards are being maintained as necessary.
15. If you require additional manpower resources, contact the Plant Administrative Manager in the TSC.

PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 9 13.10.9-3 of 32 WP.SQI R1 (9 83)

J i'

f)

~h II,V

CQNmQLLED CQPY Res onsibi lit Action Operations Support Center 16. Initiate personnel accountability For entry Director (Cont.) or exit of personnel for all areas of the Protected Area, and when the PEO directs restriction of Protected Area entry or exit:

Coordinate with the Security Operations Coordinator to allow or deny entry into the Protected Area via the Primary (PAP) and Secondary Access Points (AAP).

b. Coordinate with the Security Oper-ations Coordinator to allow or deny exit From the Protected Area via PAP and AAP.

C. Coordinate with the Central Alarm Sta-tion, the Technical Support Center and the Control Room (or any other manned area in the Protected Area) that move.

ment of personnel From those areas into other areas of the Protected Area is reported to the OSC Accountability Coordinator, and that personnel receive briefing on radiological hazards, or HP support'is provided.

17. For medical emergencies requiring transpor-tation of individual(s) offsite, refer to EPIP 13.7.8, "Transportation of Injured or Contaminated Injured Personnel to an Offsite Medical Facility."
18. Nhen advised by the Plant Emergency Direc-t tor or Shift lIianager to initiate reentry into radiological areas for the manipulation or modification of equipment, confer with the Lead Health Physics Person and initiate the appropriate section of EPIP 13.10.12 "Reentry Team Duties".
19. Keep the Plant Emergency Director and Shift Manager appraised oF the Reentry Team's progress.

PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 9 13.10.9-4 of 32 WP.5%I II1 (9 83)

I;I r,

4a

%4 (I

'4 a Q*

CQNTIRQILlED CQPY Res onsibilit Action Operations Support Center 20. When conditions allow, have the Chemistry Director (Cont.) Support personnel man the Chemistry Lab.

Provide Health Physics coverage as required.

Provide additional Chemistry personnel to perform logkeeping tasks as necessary.

21. When advised to have Chemistry personnel pull PASS samples, assign a Health Physics Technician and a PASS qualified Chemistry Technician.
22. When the recovery phase of an emergency is declared and entry into radiological areas is required for manipulation or modifica-tion of equipment, confer with the Lead Health Physics Person and implement EPIP 13.10.13 "Recovery Team Duties".
23. Refer incoming media calls to the Joint Information Center.

24 'pon shift change, turn over Log and fully brief your relief of responsibilities, duties and current status.

25. Upon shift change or termination of the emergency:
a. Prepare your individual After Action Reports. Refer to EPIP 13.13.4, "Post Incident Reporting."
b. Collect After Action Reports prepared by staff personnel.
c. Deliver all After Action Reports, Sta-tus Board Logs, and Significant Events Logs to the Plant Emergency Director.

Responding OSC Support 26. Perform preassigned duties.

Personnel

27. Maintain a chronology oF significant inputs, actions, events and their resolutions on an already established log, or on a log similar to the "Emergency Response Log", For attach-ment to your AFter Action Report. See EPIP 13.13.4, "Post Incident Reporting."
28. Perform other assignments as directed.

PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 9 13.10.9-5 of 32 WP 598 Rl (9 83)

4

,h II

13.10.9.4 Attachments A, Emergency Team Tracking Log B. Significant Events Log C. Operations Support Center Activation Cards D. Operations Support Center Administrative Staff E. Service Building Checkout Log F. Operations Support Center Floor Plan G. Operations Support Center Oirector Checklist PROCEDURE NUMBER REVISlQN NUMBER PAGE NUMBER 13.10.9 9 13.10.9-6 of 32 V/P 598 Rl (083)

EMERGENCY TEAM TRACKING LOG I I I I I I I I I ILEAVE EVENTITEAM MEMBERS/I LEAVEI OESTINATION PHONE IARRIVEI WORK IARRIVEI COMMENTS NO. TITLE OSC NO. OEST. AREA OSC Attachment A PROCEDURENUMBER REVISIQN NUMBER PAGE NUMBER 13.10.9 9 13.10.9-7 of 32 WP 599 R1 (999I

t '

Cqp

OPERATIONS SUPPORT CENTER SIGNIFICANT EVENTS STATUS BOARD DATE: RECORDER:

TIME EVENT STATUS Attachment 8 PRQCEOURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 9 13.10.9-8 ot: 32 V(P 598 R1 (983)

1I OPERATIONS SUPPORT CENTER ACTIVATION CAROS C-1 Person in Charge C-2 Equipment Person C-3 Radiological Monitor A C-4 Radiological Monitor B C-5 Accountability Person Attachment C Page 1 of 6 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 9 13.10.9-9 of 32 WP 598 R1(983)

e l'

OPERATIONS SUPPORT CENTER ACTIVATION CARDS Activation Card gl: Person in Char e A. Coordinate activation of Operations Support Center functions. Direct setup similar to Attachment F, OSC Floor Plan.

B. Assign Activation Cards sequentially to responding personnel, attempting to give card 45 to one familiar with Personnel Accountability Observe any special instructions on each card. Ensure the actions are being carried out.

C. Ensure that all arriving personnel log in via the manual accountability log system. Direct emergency personnel to the equipment lockers area, and nonessential personnel to the other side of the room.

0. Instruct arwiving emergency personnel to remain in the Operations Support Center until directed otherwise. Instruct arriving non-essential evacuation/assembly personnel to remain in the GSB hallway or other locations out of the way of the entrance to the OSC.

E. Notify the Control Room and the Technical Support Center of your arrival, name, emergency organization assignment and the status of the Operations Support Center. Keep the Shift Manager and the Plant Emergency Director informed of operational status.

F. Establish contact with the. Shift Support Supervisor and provide information on personnel status and support as requested.

G. Properly brief and be relieved by the Operations Support Center Director upon his arrival.

Attachment C Page 2 of 6 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 9 13.10.9-10 of 32 WP 598 Rl (083)

g d 0k!a~

Activation Card g2: E ui ment Person 2nd Arrivin Emer enc Res onse Person)

A. If a Health Physics person with locker and cabinet keys is not available, proceed to Access Control and obtain Operations Support Center emergency equipment locker and emerge'ncy supplies cabinet keys from the key box.

B. Return to Operations Support Center .,and unlock the Operations Support Center emergency equipment locker and emergency supplies cabinet. Remove and set up overhead projector.

C. Oistribute Significant Events Logs to overhead projector location.

0. Remove radio(s), charger(s), and base unit. Plug in.

E. Assist person in charge as needed.

F. Obtain the key from the inside of the cabinet door for the telephone box. Unlock the box and remove phones. Place all equipment in accor-dance with locations similar to Operations Support Center Floor Plan.

',Refer to diagram Attachment F.

Attachment C Page 3 of 6 PROCEDURE NUMBER REVISIGN NUMBER PAGE NUMBER 13.10.9 9 13.10.9-11 of 32 WP 598 Rl (983)

9

~at~

I'

SPECIAL INSTRUCTIONS: Assign this card to the f i rs t available Health Physics person arriving.-

Activation Card g3 Health Ph sics Tech. A A. Obtain portable monitoring equipment from the .cabinet. Perform operational checks on equipment before using.

B. As directed by the Lead HP, if a radiological release is in progress to the environment, or if there is a reason to .believe contamination control is in question, establish contamination control points at Access Control, the Service Building entrance, and the Operations Support Center entrance.

Survey personnel in the Center that were not surveyed for contamination as they entered. Segregate any personnel found contaminated. The portal monitors in HP Access Control may be utilized to expedite contamination monitoring of personnel if conditions permit.

C. As" directed by the Lead HP, or if a radiological release is in progress to the environment, restrict access through the Maintenance Shop South roll-up door and the 441'evel IKC Shop North door.

0. Make arrangements for personnel decontamination as necessary.

Maintain a continuous surveillance oF the radiological habitability of

. the Center (dose rate and airborne levels and periodically perform

=

contamination surveys). The center dose rates should be monitored utilizing portable Area Radiation Monitors and the airborne levels should be monitored utilizing a portable Continuous Air Monitor (CAM) . Keep the Operations Support Center Oirector informed.

Brief the Lead Health Physics Person upon his arrival.

Attachment C Page 4 of 6 PRCCEOURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 9 13.10.9-12 oF 32 wP.59s Rl I9 83)

~1 t

Vi'

CQNTRQLLED CQPY SPECIAL INSTRUCTIONS: Assign this card to the second available Health Physics person a rri ving.

Activation Card 44: Health Ph sics Tech. S A. If, Plant Emergency Teams or Reentry Teams are to be dispatched, assist team members with dress out (in anti-Cs or fire gear), and obtaining emergency dosimetry.

B. When assisting team members that are being dispatched into areas -with a potential for airborne radioiodine exposure, check protective clothing to insure no skin areas are exposed.

C. Perform the following duties until relieved by the Health Physics Logkeeper.

o Oistribute emergency dosimetry and keep a log of exposure history.

o Read and log in pencil dosimeters and estimated dose from returning teams.

Attachment C Page 5 of 6 PROCEDURE NUMBER REVIS/ONNUMBER PAGE NUMBER 13.10.9 9 13.10.9-13 of 32 WP 598 11 (9 83)

t P"

y 0

Ap ht14

Activation Card g5: Accountabilit Person Refer to EPIP 13.5.5 "Personnel Accountability" Attachment A and implement "Activation Card 45 Accountability Duties".

Attachment C Page 6 of 6 PROCEOURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 9 13.10.9-14 of 32 wP 5S88I (9%I

'Eo >

~"

OPERATIONS SUPPORT CENTER ADMINISTRATION STAFF DUTIES D-1 Significant Events Logkeeper D-2 Team Tracking Locator 0-3 Radio Communicator 0-4 Phone Communicator 0-5 Information Coordinator 0-6 Stenographer 0-7 Records Coordinator 0-8 Health Physics Logkeeper 0-9 Accountability Coordinator 0-10 Team Briefer/Debriefer D-ll Dosimetry Support 0-12 Warehouse Coordinator 0-13 Security. Operations Coordinator Attachment 0 PROCEDURE NUMBER AEVISIQN NUMBER PAGE NUMBER 13.10.9 9 13.10.9-15 of 32 WP 59$ Rl (983)

4 0

Duties of: 0 erations Su ort Center Si nificant Events Lo kee er Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Director Activation Level: Alert Res onsibi lities

1. Maintain the Significant Events Board, similar to Attachment 8 (i.e.,

status board via overhead projection).

2. When full, file the log in a notebook for the briefing of incoming personnel. Preserve the log for After Action Reports at the termination of. the emergency.
3. Assist with other administrative duties as directed by Operations Support Center Director.
4. Upon shift change, fully brief your relief on responsibilities, duties, and current status.
5. Upon shift change or termination of the emergency:
a. Prepare an individual After Action Report. Refer to EPIP -13.13.4, "Post Incident Reporting."
b. Deliver all After Action Reports to the OSC Director.

Attachment O-l PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 9 13.10.9-16 of 32 wP 5%I R l I9 83)

t

', lg 5

0

Duties of: 0 erations Su ort Center Team Trackin Locator Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Director Activation Level: Alert Res onsibi lities

1. Haintain the Team Location Status Board up to date.
2. When Full, make a log copy of the status board similar to Attachment A.

Maintain the log for future reconstruction documentation upon termination of the emergency.

3. Assist the Operations 'Support Center Director in team control and other administrative duties as directed.
4. Assist the Radio Communicator and/or Phone. Communicator in maintaining contact with the teams on assignment.
5. Upon shift change, Fully brief your relief on responsibilities, duties, and current status.
6. Upon shift change or termination of the emergency:
a. Prepare an individual After Action Report. Refer to EPIP 13.13.4, "Post Incident Reporting."
b. Deliver all After Action Reports to the OSC Director.

Attachment 0-2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 9 13.10.9-17 of 32 WP 59$ Rl(983)

1

'I i

I ih

Duties of: 0 erations Su ort Center Radio Communicator Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Director Activation Level: Alert, Res onsibilities 1... Set up and maintain radio communications with dispatched teams as necessary.

2. Maintain a radio traffic log so that requests for equipment or action can be relayed and tracked accurately.

3: = assi'st the, Team Tracking Locator.

4. . Coordinate with the ,Operations Support.,Center Director in communicating duties and directions to each team.
5. Relay team messages to the Operations Support Center Director as necessary.
6. Assist the Operations Support Center Director with other administrative duties as directed.
7. Upon shift change, fully brief your relief on responsibilities, duties, and current status.
8. Upon shift change or termination of the emergency:
a. Prepare an individual After Action Report. Refer to EPIP 13.13.4, "Post Incident Reporting."
b. Deliver all After Action Reports and Logs to the OSC Director.

Attachment 0-3 ROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 9 13.10.9-18 of 32 WP 598 R1(9aII

Duties of: 0 erations Su ort Center Phone Communicator Assignment Location: 0 erations Su ort Center Report .to: 0 erations Su ort Center Director Activation Level: Alert Res onsibi lities

l. Act as the phone communicator for the Operations Support Center Director.

2 ~ Assist the Team Tracking Locator if teams. are utilizing phones for communications.

3. Assist with other administrative duties as directed by Operations Support Center Director.
4. Upon shift change, brief your relief on responsibilities, duties, and current status.
5. Upon shift change or termination of the emergency:
a. Prepare an individual After Action Report. Refer to EPIP 13.13.4, "Post Incident Reporting."=

'b. Deliver all After Action Reports to the OSC Director.

Attachment D-4 PRGCECURE NUMBER REVIStON NUMBER PAGE NUMBER 13.10.9 9 13.10.9-19 of 32 WP.SQB Rl (9 83)

A I

S~"

qi

'(

Duties of: 0 erations Su ort Center Information Coordinator Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Director Activation Level: Alert Res onsibilities Implement duties as directed in EPIP 13.11.18 "Information Network".

Attachment D-5 PROCEOURE NUMBER REVISiON NUMBER PAGE NUMBER 13.10.9 9 13.10.9-20 of 32 WP.598 R I (9 83)

L I

.ILr

+I N

I, 4*A% s

CQNmQLLED CQPY Duties of: 0 erations Su ort Center Steno ra her Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Director Activation Level: Alert Res onsibi lities

1. Maintain a log of all major events and activities involving the OSC Director or his designee, with emphasis on:
a. Receipt of notifications of changes in emergency classification.
b. The content of briefings and the identity of persons with whom he interfaces.
c. Significant telephone conversations.
d. The input and orders for decisions made.
e. Any entry at his request.
2. Perform other duties as, requested by the OSC Director or his designee.
3. Upon shift change:
a. Fully brief your relief of responsibilities, duties and current status.
b. ,Forward your log to the OSC Director.
4. Upon shift change or termination of the emergency:
a. Prepare an individual After Action Report. Refer to EPIP 13.13.4, "Post Incident Reporting;"
b. Deliver all After Action Reports to the OSC Director.
5. Upon termination of the emergency, provide the OSC Director with any required After Action Report typing and report consolidation needed.

Attachment 0-6 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 9 13.10.9-21 of 32 Wp 598 III (9'aI)

-"f%

Outies of: Records Coordinator Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Oirector Activation Level: Alert Res onsibi lities Perform record searches, retrievals, and administrative duties as directed by the Operations Support Center Oirector.

2. Verify that the most up-to-date revision of records/documents are being utilized, i.e., procedures, drawings, Forms, etc.

3: 'pon shift change, fully brief your relief on responsibilities, duties, and current status.

Upon shift change or termination of the emergency:

a. Prepare an individual After Action Report. Refer to EPIP 13.13.4, "Post Incident Reporting."
b. Oeliver all After Action Reports to the OSC Oirector.'ttachment 0-7 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 9 13.10.9-22 of 32 WP 598 Al (9 83)

C 4l

'C' 0

Duties of: Health Ph sics Lo kee er Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Lead Health Ph sicist Activation Level: Alert

.Res onsibi lities Oocument all reported health physics data. Keep the Lead'ealth Physics Person informed.

2. Update the survey maps with the most current data.
3. Update the Hazardous Area(s) Status Board.
4. Assist the Lead Health Physics person as directed.

5, Oistribute emergency dosimetry and keep a log of exposure history

6. Read and log in pencil dosimeters and estimated dose from returning teams.
7. Upon shift change, fully brief your relief of'esponsibilites, duties and current status.
8. Upon shift change or termination of the emergency:
a. Prepare an individual After Action Report. Refer to EPIP 13.13.4, "Post Incident Reporting."
b. Deliver all After Action, Reports to the .Lead Health Physcis Person Attachment 0-8 PROCEDURE NUMBER REVISlGN NUMBER PAGE NUMBER

, 13.10.9 9 13.10.9-23 of 32 WP.598 Rl (9 83)

a CQNTRQLLEQ CQPY Duties of: 0 erations Su ort Accountabilit Coordinator Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Director Activation Level: Alert

,Res onsibi lities

1. Refer to EPIP 13.5.5 "Personnel Accountability Duties"'nd implement the applicable section.
2. Assist the Operations Support Center Director in, other administrative duties as directed.
3. 'aintain a log similar to Attachment E,"Service Building Checkout Log" of all personnel who leave the OSC.
4. Upon shift change or termination of the emergency:
a. Prepare an individual After Action Report. Refer to EPIP 13.13.4, "Post incident Reporting."
b. Deliver all After Action Reports to the OSC Director.

Attachment 0-9 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 9 13.10.9-24 of 32 VIP.598 R I (0 83)

Duties of: 0 erations Su ort Center Briefer/Debriefer Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Director Activation Level: Alert

.Res onsibi lities

1. Complete, process and maintain a team briefing/debriefing form for each reentry/recovery team dispatched from, and returning to the OSC pursuant to EPIP 13.10.12/13.10.13.
2. Assist the OSC Director in the briefing/debriefing oF the teams and with other administrative duties as directed.
3. Assist the Team Tracking Locator and Accountability Coordinator in the tracking of teams/personnel as required.
4. Upon shift change, fully brief your relief on responsibilities, duties, and current status.
5. Upon shift change or termination of the emergency:
a. Prepare an individual After Action Report. Refer to EPIP 13.13.4, "Post Incident Reporting."
b. Deliver all After Action Reports to the OSC Director.

Attachment D-10 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 9 13.10.9-25 of 32 WP 598 Rl i9.N)

~C t,)

~

1f "I 1'i e i ~

I

)1 Y

Duties of: Dosimetr Su ort Assignment Location: 0 erations Su ort Center Report to: Lea'd Health Ph sicist Activation Level: Alert Res onsibilities

l. Distribute emergency dosimetry and keep log of exposure history.

2.. Read and log in pencil dosimeters and estimated dose from returning teams.

3. Verify exposure, medical and training data by way of the RER system as needed.
4. Update exposure data on the RER system as directed.
5. Perform habitability check of OSC every 15 minutes by observing the CAN and ARN performing radiation surveys if needed, and by spot checking For contamination.
6. Remind personnel in the OSC to read their dosimetry periodically as established by Lead HP.
7. Upon shift change or termination of the emergency:
a. Prepare an individual After Action Report. Refer to EPlP 13.13.4, "Post incident Reporting".

b.'eliver all After'ction Reports to'the OSC Director.

Attachment D-ll PROCEDURE NUMBER REVIStON NUMBER PAGE NUMBER 13.10.9 9 13.10.9-26 of 32 WP 59$ Rl (9 83)

JVf Outies of: Warehouse Coordinator Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Oirector Activation Level: Alert Res onsibilities

1. Provide the OSC Oirector with assistance in locating and obtaining ware-house materials and parts needed by Plant emergency personnel.
2. Notify Warehouse Management/Supervisor that an emergency condition exists, and request additional manpower resources that may be needed to support emergency operations.
3. Upon shift change, fully brief your relief on responsibilities, duties and current status of emergency operations.
4. Upon shift change or termination of the emergency:
a. Prepare an individual After Action Report. Refer to EPIP 13.13.4, "Post Incident Reporting".
b. Oeliver all After Action Reports to the OSC Oirector.

Attachment 0-12 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 9 13.10.9-27 of 32 WP 59B Rl I9.aI)

yF V

,pl l~

W

CQNmQLLED t.QPY Duties of: Securit 0 erations Coordinator Assignment Location: 0 erations Su ort Center Report to: 0 erations Su ort Center Director Activation Level: Alert Res onsibi lities

l. Provide the OSC Director, Security Manager, and TSC Administrative Manager with periodic briefings on specific security contingency events that may influence the movement of Plant emergency personnel within Protected or Owner Controlled Areas of the Plant during emergency events.
2. Maintain contact. with the Security Shift Supervisor in order to keep the OSC Director informed of Security Force personnel's locations and actions.
3. Assist the OSC Accountability Coordinator in tracking Security personnel as required.
4. When required, ensure the Primary Access Point ( PAP) and Alternate Access Point '(AAP) are directing personnel to process through the OSC beFore entering or exiting the Plant Protected Area.
5. Obtain information From the OSC Lead HP in order to coordinate instruc-tions with the Security Shift Supervisor on the nature and location of Plant radiological hazards; and where necessary, coordinate protective clothing needs and HP support for Security personnel that must operate in radiologically hazardous areas.
6. Upon shift change, fully brief your relief on responsibil'ities, duties and current status of emergency operations.
7. Upon shift change or termination of the emergency:
a. Prepare an individual After Action Report. Refer to EPIP 13.13.4, "Post Incident Reporting".
b. Deliver all After Action Reports and Logs to the OSC Director.

Attachment D-13 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 9 13.10.9-28 oF 32 WP 59IIRI I983I

tf ~ I il SERVICE BUILOING CHECKOUT LOG MANE OEST I MAT ION OUT IN of OSC to OSC Attachment E PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 9 13.10.9-29 oF 32 WP 598 RI (9 N)

h f VfVVAV g+V fVVV, V 4 If

CQNTRQLLED CQPY Operations Support Center Floor plan (Similar to)

CS oCl ccl cd Range C(4 M

Cl a

Cl tL, Flies Cl

~o Cl CS oC C

C 0

c 0 0 a cd 01 o 0 0 <<Vl c

a CS cl C Vl Q 0 a 01 o 0 o a ~a 0 01 41 Id 0 4 0t 0 c CSS OO 4 Cl Vl 0(

'0 CI C1 CI

'0 C C C (d 01 CD 6 04a Cl 0 o cd Cl C

Cl Cl a 0 C 41 o 41 C C Q CS Cl 0

CC aso~

CS Cl o 0 0

-CCC o (d a 01 0 C

4l Cl 0 0 cd 01 4 O C 01 g4 Cl Cll CI 0 CS QS LLS I

0 a 0~ ~p <<I C C o

CQ QS CS CS

a. c 0 41 C 0 c1 Co ~

C 41 O l g.

c 01 <<( CS 0

41 O

CD co%0 (d 4O~ 0 C cd 0

C 0 0 O 0 41 o

01 c

0 o cs ~asal 0 C Vl 0 Cl O I C C Q Cl QS cC 0 C a ~~< = 22 OI o LLS LLL C 01 Cla 0 Cl Vl Cl T

'(S'1 C CS 0 0l CJ C.o 5 CJ 41 a aM CI a Ca Ci Cl M OOSSCl '0

~O C CL l ~ ( C C a Cl C(S '0 41 0l Cl Cl CQ a C1 vl as LLS Vl Q 0 PC L 0l OO 4 Cl Oa C ~0 a Cl 0cs cclCl ac0 a a OVl oE ClCo C 41C Vl ~

(

CI7 cd cd Cll Vl CS OQ. Vl C 0 LLS 44S:l l WQ 0 LLS LLS I Q.Q. W CS

~

CS O 00 <<4 Vl 0 O

<< WT+ T+ 0 Ccl m ~ ICS Cd <<CV

~

~ ~

4(S dl

~ ~ ~

dl dl

~ CS

~ Q3 Ql QS CLS CL QS CQ 44 Attachment F Ill 'I(( c(I P ROCECURE NUMSER REVISLCN NUMBER PAGE NUMSER 13.10.9 9 13.10.9-30 of 32 WP 5((8 LL1 (9 81)

4 4

't h Ie

OSC DIRECTOR CHECKLIST OSC Director Date ~

Time Tl llle Action Initiated ~tom 1eted

l. Upon arrival, assess the state of readiness for OSC personnel and resources to perform defined tasks.
2. Obtain briefing from Shift Manager on Plant conditions, hazards, and status of Plant Emer-'ency Teams (PETs).
3. Establish with SM/PED what teams will be under OSC or Control Room control. N/A N/A 4.'OSC"'d'eclared" "ACTIVATED" at hrs. By a) PA announcement that OSC is activated and any special instructions. N/A b) Announcement that OSC is activated to OSC staff, and other Plant emergency centers. N/A
5. Ensure OSC habitability monitoring has commenced. N/A
6. Direct Plant,accountability commence per EPIP 13.5.5.
7. If>OSC uninhabitable:
a. Relocate select personnel to alternate OSC.
b. Notify PED and other Plant emergency

'centers of OSC relocation. N/A

c. If required evacuate OSC non-selected personnel per EPIP 13.5.1. N/A
8. If additional OSC manpower is needed, notify the Plant Administrative Manager at the TSC. N/A Attachment G Page 1 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 13.10.9-31 oF 32 WP.SQI R 1 (9 83)

est tl ih

CQlMTIRQLLEG CD'SC DIRECTOR CHECKLIST (,Continued)

Time Action completed Initials

9. IF required, transport injured or contaminated llew personnel ofFsite per EPIP 13.7.8.
10. Chemistry Lab activated with Health Physics coverage as required.

PASS samples obtained with HPs and PASS qualified Chemistry Technicians.

12. 'If PED directs restriction of Protected Area entry or exit, coordinate PAP/AAP actions with OSC Security Coordinator.
13. Coordinate Plant's material needs with OSC Warehouse Coordinator. N/A
14. Conduct Reentry Team actions per EPIP 13.10.12.
15. Conduct Recovery Team actions per EPIP 13.10.13.
16. Upon shift change, turn over OSC Director Log and fully b ri e f your re 1 ie f. N/A
17. Upon termination of emergency, prepare AFter Action Report, then collect all stafF After Action Reports and Logs, and deliver to Plant Emergency Director. N/A Attachment G Page 2 of 2 PROCEOURE NUMBER REVISION NUMBER PAGE NUMBER 13.10.9 13.10.9-32 of 32 WP 59B R l (9 aI)

wAAHsnoson nv ~ Llc tosssn 4P SUPPLY SYSTEM PLANT PROCEDURES MANUAL WNP-2 PROCEDURE NUMBER APPROVED / yg DATE 13.11.13 4l~tr/gdCuI,I~ 08 08 89 VOLUME NAME 13 EMERGENCY PLAN IMPLEMENTING PROCEDURES SECTION 13.11 EMERGENCY OPERATIONS FACILITY TITLE 13.11.13 EOF NEWS WRITING TEAM DUTIES 13.11.13.1 ~nor osn This procedure describes the activation and operation of the Emergency Operations Facility (EOF) News Writing Team. The purpose of this team is to prepare written Supply System news releases and technical bulletins and ensure timely transmission of these items to the Joint Information Center (JIC) Assistant JIC Director for dissemination to the JIC Director, Spokesperson, and Technical Spokesperson. This team also develops and transmits emergency information to INPO via Nuclear Network. The team reports to the Recovery Manager, The team consists of the EO Public Information Officer and the Network Coordinator and technical liaisons.

13.11.13.2 References EPIP 13.13.4, Post Incident Reporting INPO 84-014 Rev. 4, Nuclear Network User's Manual INPO .87-014 Rev. 1, NPRDS Access Guide 13.11.13.3 Procedure Action EOF News Writing Team l. Upon notification of an Alert, Site Area or Member General Emergency, proceed to the Emergency Operations Facility (EOF). Show emergency ID to Hanford Security at checkpoint(s).

2. Upon arrival at the EOF, enter through Ambulance Bay door if area is activated.

If the ambulance bay is not activated enter via normal entry points'.

PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.11.13 13.11.13-1 of 4 WP 697 R3 (2/66)

Res onsibilit Action EOF News Writing Team 3. Sign in on staffing board in the Supply Sys-Member tem Decision Center and on the log-in sheet in the Media Briefing Preparation Area (HBPA). Pick up materials from the Offsite Agency Coordination Center (OACC) emergency cabinet.

EOF Public Information Upon arrival at the EOF notify the Officer Administrative Support of availability.

5. Establish contact with the JIC Director and the JIC Director's Secretary.
6. Coordinate and direct activities of the EOF News Writing Team as needed.
7. Advise the Recovery Manager on matters pertinent to public information and JIC status and operations.
8. Obtain approval from the Recovery Manager for media tours and briefings at the EOF.

Ensure detailed coordination with the JIC Director/Hedia Manager.

EOF Public Information 9. Ascertain the status of the event. Prepare Officer/Technical news releases, technical bulletins and Nuc-Liaisons lear Network Bulletins as appropriate.

Obtain technical approval from the Assistant Recovery Manager before transmitting to the JIC. Remember that Counties report protec-tive actions.

10. Establish computer link with JIC to trans-mit releases/bulletins to the Assistant JIC Director thru the JIC Editor. Remind JIC staff that if the technical content of a news release is changed, JIC must obtain approval from the Assistant Recovery Manager.

Transmit Emergency Information Bulletins to INPO via Nuclear Network. Report emergency classification changes (upgrade, downgrade or termination) and major events occurring during the emergency. See Attachment A, for Nuclear Network Information Bulletin format.

t PROCEOURE NUMBER WP.SSS R1 (943) 13.11.13 REVISION NUMBER 7

PAGE NUMBER 13.11.13-2 of 4

Res onsibilit Action Network Coordinator (Cont.) 12. 'As directed, access the Nuclear Plant Reliability Data System (NPRDS) to obtain information on the nationwide location of spare parts or sources for system information.

13. Utilize communication equipment located in the PSF to access Nuclear Network and other information data bases. If necessary relocate portable equipment to the HBPA.

EOF News Writing Team 14. Maintain a chronology of significant inputs, Hembers actions, events and their resolutions on an already established log, or on a log similar to the "Emergency Response Log",

for attachment to your After Action Report. See EPIP 13.13.4, "Post Incident Reporting",

15. Refer any, calls from the news media to the Joint Information Center.
16. Upon shift change, fully brief your relief as to events which have transpired.
17. Upon shift change or termination of the JjC function:

a, Prepare an individual After Action Report (Refer to EPIP 13.13.4, "Post Incident Reporting" ).

b. Deliver the original After Action

. Report to the JIC Director and provide a duplicate After Action Report to the Assistant Recovery Manager.

13.11.13.4 Attachments

> A. Format For Nuclear Network Information Bulletin PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.11.13 7 13.11.13-3 of 4 WP.598 R1 ($ 43)

CONTIROLLED COP V FORMAT FOR NUCLEAR NETWORK INFORMATION BULLETIN NT Topic (Specified by INPO)

( If THIS IS A GRILL SO NOTE AT BEGINNING AND END OF THE TRANSMISSION)

GENERAL INFORMATION

'tility.

'lant.

. Washington WNP-2' Public Power Supply System Location . Richland, Washington Oate .

Classification .

Time .

Release No.

SUBJECT:

MESSAGE:

INFORMATION CONTACT NAME PHONE Approved by: Oate Time Attachment A PROCEDURENUMBER REVISION NUMBER PAGE NUMBER 13.11.'13 13.11.13-4 of 4 WP.598 Rl (9.83)

masssswmsms ~I el Is emllae 43 SUPPLY SYSTEM PLANT PROCEDURES MANUAL WNP-2 PROCEDURE NUMBER DATE 13.14.1 g'pfj/ecu';ra 06/25/90 VOLUME NAME 13 EMERGENCY PLAN INPLENENTING PROCEDURES SECTION 13.14 SUPPORTING INFORMATION PROCEDURES TITI.E 13.14.1 EMERGENCY EXPOSURE LEVELS/PROTECTIVE ACTION GUIDES 13.14.1.1 ~Pur ose This procedure outlines the authority and process to exceed administra-tive exposure guides, and to implement 10CFR20 limits and implement emer-gency worker Protective Action Guides (PAGs). Additionally, it provides Supply System, State, and Federal PAGs as references. PAGs are numerical projected or monitored doses or dose rates that act as trigger points to initiate Protective Action Decisions (PAOs) for Supply System emergency workers and field team members and/or trigger Protective Action Recommen-dations (PARs) for other emergency workers and/or the general public outside of the Supply System's area of authority. This procedure is divided into two parts: Part A deals with Emergency Exposure levels and Part B deals with PAGs.

13.14.1.2 References A. 10CFR20.101 Radiation Dose Standards for Individuals in Restricted Areas B. Mashington State Oepartment of Health (OOH), Res ense Procedures for Radiation Emer encies, Appendix A, "Protective Action Guides" C. PPM 11.2.5.1 Personnel Exposure Limits and Guides EPIP 13.14.2 - Process for Determining Protective Action Recommendations and Protective Action Decisions PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.1 7 13.14.1-1 of 15 WP.597 R3 I2/86)

4 ~

n 13.14.1.3 Procedure A. Emer enc Ex osure Levels Res onsibi lit Action Radiation Protection Manager l. Apply the principles of ALARA.

(for emergency workers'within the Protected Area) and 2. If practical, do not authorize 'expo-Radiological Emergency Manager sures exceeding Supply System Adminis-(for Supply System emergency trative Exposure Guides (Attachment A).

workers and field team members at any location outside of the Protected Area) 3. When necessary, authorize exposure(s) in excess of Supply System Admini-strative Exposure Guides (but not to exceed 10CFR20 Limits, Attachment 8).

4. Prior to authorizing increased expo-sures, if practical review individual exposure histories on the Radiation Exposure Records (RER) System.
5. Caution personnel to maximize efforts to remain below 10CFR20 Limits.
6. Oocument authorization and include in After Action Report.
7. As needed, 'obtain permission from the Plant Emergency Oirector or Recovery Manager (as applicable) to implement emergency exposure guides above 10CFR20 limits.
8. When implementing the emergency expo-sure guides for emergency workers, ensure that:
a. Persons involved are volunteers who are broadly familiar with the consequences of such exposures.
b. First consideration is given to volunters above the age of 45.

C. Women of child bearing age are not normally included.

PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.1 13.14.1-2 of 15 wP.598 At I9 83)

Res onsibi lit Action Plant Emergency Director 9. Evaluate alternatives prior to granting (for emergency workers within authorization to exceed Attachment 8, the Protected Area) and "10CFR20 Limits".

Recovery Manager (for Supply System emergency 10. Nhen authorizing exposures in excess of workers and field team members 10CFR20 Limits, refer to Attachment C at any location outside of the "Protective Action Guide For Plume Protected Area) Exposure Pathway" and Attachment 0, "Additional Emergency Morker Protective Action Guidance".

Author i ze uti i za t i on 1 of app 1 i cabl e emergency guides in Attachments C and 0, when necessary, and after consultation with the Radiation Protection Manager, or with the Radiological Emergency Manager For respective areas,

12. Document authori za t i on for later incorporation into your After Action Report.

B. Protective Action Guides Plant Emergency Director, Refer to Attachment E, "Guidance in Recovery Hanager Administering Potassium Iodide", for Radiation Protection Manager and guidance in developing recommendations Radiological Emergency Manager to all emergency workers for the self-administration of (KI).

Plant Emergency Director 2. Refer to Attachment C, "Protective Shift Technical Advisor and Action Guide for Plume Exposure Path-Radiation Protection. Manager way", for guidance in developing public OI PARs for the Plume Emergency Planning Recovery Manager Zone.

Radiological Emergency Manager and 3. Refer to EPIP 13.14.2, "Process for Protective Action Decision Group Determining Protective Action Recommen-in HUDAC dations" for guidance in the handling of PARs and PADs.

Recovery Manager, 4, Refer to Attachments F for standards in Radiological Emergency Manager developing PARs for the Ingestion Zone.

and Protective Action Decision Group in HUDAC PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14,1 13.14.1-3 of 15 WP 588 Rt I5 83)

Res onsibilit Action Life-Saving Emergency Worker 5. To avoid restricting actions that may be necessary to save lives, use your

'udgement to determine the amount of exposure you will accept to perform emergency lifesaving actions (normally see should not exceed 75 REN Attachment C).

13,14.1.3 Attachments A. Supply System Administrative Exposure Guides B. 10CFR20 Limits C. Protective Action Guide for Plume Exposure Pathway D. Additional Emergency LJorker Protective Action Guidance E. Guidance for Administering Potassium Iodide (KI)

State Derived Intervention Levels (DILs), Ingestion Exposure Pathway G. State Radioactivity Contamination Guide State Surface Radioactivity Contamination Guide PROCEDURE NUMBER REVIS1ON NUMBER PAGE NUMBER 13.14.1 13.14.1-4 of 15

%A SUPPLY SYSTEM ADMINISTRATIVE EXPOSURE GUIDES (a)

NOTE: Authorization approval to exceed guides diFFers under emergency conditions, see EPIP 13.14.1.3 as allowed by Reference D.

1. The admini strati ve exposure guide for the whole body shall be 300 mrem er da . This administrative exposure guide should not be exceeded without the prior approval of the Health Physics/Chemistry Manager or designated representative.
2. In keeping with the Supply System commitment to ALARA, the normal quarterly exposure guide is 1000 mrem, exposures greater 'than 1000 mrem per quarter will be controlled by the Health Physics/

Chemistry Manager who will ensure reasonable efforts are made to maintain personnel exposure to less than 5 rem per calendar year.

3. For the calendar year, the external whole body exposure guide shall be 5.0 rem. Recommendations by the Health Physics/Chemistry Manager, concurrence of the Plant Manager and approval of the Assistant Managing Director For Operations is required to exceed this guide.

(a) Reference C Attachment A PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.1 13.14.1-5 of 15 WP 598 II1 (9.83)

- 10CFR20 LIMITS (a)

Permissible Ooses, Levels, and Concentrations 20.101 Radiation dose standards for individuals in restricted areas.

(a) In accordance with the provisions of 20.102(a), and except as provided in paragraph (b) of this section, no licensee shall possess, use, or transfer licensed material in such a manner as to cause any individual in a restricted area to receive in any period of one calendar quarter from radioactive materials and other sources of radiation a total occupational dose in excess of the standards specified in the following table:

REMS Per Calendar Quarter

1. Nhole body; head and trunk; active blood forming organs; lens of eyes; or gonads 1 1/4
2. Hands and forearms, feet and ankles 18 3/4
3. Skin of whole body 7 1/2 (b) A licensee may permit an individual in a restricted area to receive a total occupational dose to the whole body greater than that permitted under paragraph (a) of this section, provided:

Ouring any calendar quarter the total occupational dose to the whole body shall not exceed 3 rems; and

2. The dose to the whole body, when added to the accumulated occupational dose to the whole body, shall not exceed 5 (N-18) rems where "N" equals the individual's age in years at his last birthday; and
3. The licensee has determined the individuals accumulated occupational dose to the whole body on Form NRC-4 or on a clear and legible record containing all the information required in that form; and has otherwise complied with the requirements of 20.102. As used in paragraph (b), "Oose to the whole body" shall be deemed to include any dose to the whole body, gonads, active blood-forming organs, head and trunk, or lens of eye.

(25 FR 10914, Nov. 17, 1960, as amended at 44FR32352, June 6, 1979)

From the "Code of Federal Regulations-Energy-10 Parts 0-199 Rev. Jan 1, 1987.

(a) Reference A Attachment 8 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.1 13.14 1-6 of 15 F

wP 598 Rl (983)

l~

,"P

+

6~

4, l

PROTECTIVE ACTION GUIDE FOR PLUME EXPOSURE PATHMAY (a)

Projected Nhole Projected Thyroid Po ulation at Risk Bod Gamma Dose rem Dose rem General population Emergency workers 25 125 Lifesaving activities 75 (b)

(a) Reference A (b) No specific upper limit is given for thyroid exposure since, in the extreme case, complete thyroid loss might be an acceptable penalty for a life saved. However, this should not be necessary if respirators and/or thyroid protection for rescue personnel are available.

Attachment C PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.1 13.14.1-7 of 15 VilP 598 IIl (9 83)

f t,~

~

"'+I

'h pj "ol

ADDITIONAL EMERGENCY MORKER PROTECTIVE ACTION GUIOANCE

.Exposure Level Projected Function or Actual Oose/Rate Emer enc Action I ~ Oper ational and maintenance 1. 5 rem whole body. l. Emergency Operations Procedures actions to limit accident. 2~ 25 rem thyroid. (EOP) and activities associated

3. 75 rem extremities. with performing the procedures.
2. Volume IV), Abnormal Procedures, and activities associated with performing these guidelines.
3. Flaintenance activities to correct equipment and repair system under Emergency Operations Procedures and Volume IV, Abnormal Procedures.

II'iquid, air, and other 1. 5 rem whole body. 1. Collect in-plant airborne and environmental sampling under 2. 25 rem thyroid. liquid samples. Use the Post accident conditions. 3. 75 rem extremities. Accident Sampling System (PASS).

2. Oetermine offsite dose rate and collect environmental samples.

III. Corrective or protective 25 rem whole body. l. Provide First aid, ambulance actions. 2~ 125 rem thyroid. service, fire fighting.

3. 375 rem extremities. 2. Any corrective or emergency action undertaken to plant systems and equipment For onsite and offsite safety purposes. Flay 'nclude activation under EOP and Volume IV, Abnormal Procedures.

IV~ l.ifesaving or rescue. l. 75 rem whole body. 1. Rescue or removal of injured

2. No limit thyroid. (a) personnel from plant or offsite area.

(a) Thyroid exposure should be minimized to the extent feasible by the use of respiratory protection and/or thyroid prophylaxis. However, no upper limit is specified for life-saving action since complete loss of thyroid Function may be considered an acceptable risk for saving liFt.

Attachment 0 Page 1 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.1 13.14.1-8 of 15 WP 598 Rt (983I

"\

tj

ADDITIONAL EMERGENCY MORXER PROTECTIVE ACTION GUIOANCE {Continued)

Function or Actual Oose/Rate Emer enc Action V. Use and/or administration of 1. Projected dose rate to 1 ~ Personnel in the Control. Room, Potassium Iodide (KI) for the thyroid greater than or Technical Support Center, emergency workers. Refer to equa'1 to 250 mrem/hr or Operations Support Center, Attachment E. radioiodine concentration and Emergency Operations are projected, expected, Facility self-administer (KI).

or measured to exceed Potassium Iodide (KI) is 1.4 x 10 7 uci/cc (15 NPC). available in kit located in each of the areas.

2. If (KI) is not available, avoid activities in areas with dose projected to be greater than 250 mrem/hr to the thyroid or above 15 MPC.

VI. Habitability Critical Area(b)

A. Noncritical Functions l. 50 mrem/hr to whole body. l. At 50 mR/hr whole body field, evacuate all emergency workers not critical to controlling the accident.(c)

(Based on a 12-hour workday.)

B. Cr itical Functions l. 250 mrem/hr to whole body. l. At 250 mR/hr whole body field, limit time to critical workers to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or less. Take other corrective actions as appropriate to reduce exposure levels.

(b) Critical areas include Control Room, Technical Support Center, and Emergency Operations Facility.

(c) Evacuation of non'critical personnel to areas with lower exposure levels. Evaluations should be made to ensure that egress dose to the individual does not exceed the dose if the individual remained in the area.

Attachment D Page 2 of 2 PROCEDURE NUMBER REVIStON NUMBER PAGE NUMBER 13.14.1 13.14.1-9 of 15 IYP 598 B 1 (9 83)

pl If C

GUIDANCE FOR ADMINISTERING POTASSIUM IODIDE KI A. ~Per oee This attachment provides guidelines for recommending administration of potassium, iodide (KI) to all emergency workers both on and offsite as a thyroid-blocking agent to provide protection against airborne radioiodine.

8. Location of KI Su lies
1. Control Room
2. Technical Support Center
3. Operations Support Center
4. In-plant Emergency Equipment Cabinets
5. Emergency Operations Facility
6. Field Team Kits
7. Primary Access Point C. Procedure for Administration
l. Within the protected area, the Plant Emergency Director, in consul-tation with the Radiation Protection Manager, shall recommend that emergency workers in the Control Room, Central Alarm Station, Operations Support Center, Technical Support Center, and any other Protected Area location deemed necessary, take KI:

o When radioiodine concentrations in air are known, projected or expected to exceed 1.4 x 10 > uCi/cc (15 NPC), if the projected dose rate to the thyroid is greater than or equal to 250 mrem/hr, or if the release is from an unmonitored source known to contain radioiodine.

2. The Radiological Emergency Manager shall recommend that Supply System emergency workers and all Field Teams at locations outside the Protected Area take KI and make the recommendation to the Recovery Manager for all other emergency workers:

o When radioiodine concentrations in air are known, projected or expected to exceed 1.4 x 10 7 uCi/cc (15 NPC), if the projected dose rate to the thyroid is greater than or equal to 250 mrem/hr, or if the release is from an unmonitored source known to contain radioiodine.

Attachment E Page 1 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14,1 13.14.1-10 of 15 WP 598 Rl I983)

GUIDANCE FOR ADMINISTERING POTASSIUM IODIDE KI (Continued)

3. The Recovery Manager should transmit required protective action recommendations to authorities (State, County and DOE), recommending KI for emergency workers.
4. Individuals recommending the use of KI tablets bottle's should direct personnel to follow the "Directions for Use" on the label (copy attached to each bottle).
5. As directed by the Radiation Protection Manager, or the Radiological Emergency Manager for respective areas, personnel shall use respirators in addition to KI for thyroid protection.
6. Personnel precluded from taking KI due to medical or other reasons shall inform the Radiation Protection Manager or Radiological Emergency Manager as to their situation.

Attachment E Page 2 of 2 PROCEDURENUMBER REVISION NUMBER PAGE NUMBER 13.14.1 13.14.1-11 of 15 WP 598 Rl (983)

lt

~ f4 l

'P

k k

STATE DERIVED INTERVENTION LEVELS OILs INGESTION EXPOSURE PATHWAY Preventative Level a A, Total Projected Dose Commitment For One Year Ingestion++

Whole Body. 0.5 rem Thyroid 1.5 rem DERIVED INTERVENTION LEVELS 1-131 Cs-134 Cs-137 Sr-09 Sr-90 B. Deposition on Ground 61,000+ 160,000 72,000 690,000 31,000 (picocuries/square meter)

C. Deposition on Pasture 23,000+ 64,000 31,000 260,000 11,000 (picocuries/kilogram)

D. Milk 7,000+ 12,000 5,800 12,000 550 (picocuries/liter)

E. Water 11,000+ 51,000 25,000 46,000 2,400 (picocuries/liter)

F. Leafy Vegetables 7,800 12,000 6,000 13,000 580 (picocuries/kilogram)

G. Produce+++ 15,000+ 1,100 480 ',900 40 (picocuries/kilogram)

H, Heat 38,000 14,000 7,300 15,000 680 (picocuries/kilogram)

I. Fish 12,000 13,000 6,300 13,000 590 (picocuri es/kilogram)

+Taken from the Infant Derived Intervention Levels: All other values taken from Child Derived Intervention Levels.

++Except contaminated water ingested for only five days.

+++The reason the produce numbers are low is that they do not include weathering.

Host produce is harvested when ripe and then stored, during which there is only decay.

(a) Excerpted from State Department of Health (DOH) Procedures (Reference 8)

Attachment F Page 1 of 2 PROCEOURE NUMBER REVISION NUMBER PAGE NUMBER 13,14,1 13.14.1-12 of 15 W17 598 Al (9 83)

ql

~i F

L'

STATE DERIVED INTERVENTION LEVELS OILs INGESTION EXPOSURE PATHMAY Emer. enc Level a A. Total Projected Dose Commitment For One Year Ingestion++

Mhole Body 5.0 rem Thyroid 15.0 rem DERIVED INTERVENTI'ON LEVELS I-131 Cs-134 Cs-137 Sr-89 Sr-90 B. Deposition on Ground 610,000+ 1,600,000 720,000 6,900,000 310,000 (picocuries/square meter)

C. Deposition on Pasture 230,000+ 640,000 310,000 2,600,000 110,000 (picocuries/kilogram)

D. Hi 1k 70,000+ 120,000 58,000 120,000 5,550 (picocuries/liter)

E. Mater 110,000+ 510,000 250,000 460,000 24,000 (picocuries/liter)

F. Leafy Vegetables 78,000 120,000 60,000 130,000 5,800 (picocuries/kilogram)

G. Produce+H. 150,000+ 11,000 4,800 39,000 400 (picocuries/kilogram)

H. Heat 380,000 140,000 73,000 150,000 6,800 (picocuries/kilogram)

I. Fish 120,000 130,000 63,000 130,000 5,900 (picocuri es/ki 1ogram)

+Taken from the Infant Derived Intervention Levels: All other values taken from Child Derived Intervention Levels.

++Except contaminated water ingested for only five days.

+++The reason the produce numbers are low is that they do not include weathering.

Host produce is harvested when ripe and then stored, during which there is only decay.

j (a) Excerpted from State DOH Procedures (Reference 8)

I Attachment F Page 2 of 2 PROCEDURENUMBER REVISlON NUMBER PAGE NUMBER 13.14.1 13.14.1-13 of 15 V/P 593 Rl (9 83)

STATE RAOIOACTIVITY CONTAMINATION GUIDE (a)

ALPHA[l] BETA-GAMMA[2]

dpm/per 100 cm2 dpm/per 100 cm2 Emergency General Emergency General Worker Public Worker Publ i c Personnel [3] 200 100 2000 1000 Clothing and Personal 200 100 2200 1000 Equipment Vehicles and l.arge 2000 100 5000 2000 Equipment

[1] Nuclear Wea on Accident Res onse Procedures Manual, Department of Defense, January 1984.

[2] Pre aredness and Res onse in Radiation Accidents, Devices and Radiological Health PB 84-104736, August 1983.

Persons Accidentl Contaminated with Radionuclides, 1980.

(a) Excerpted from state Department of Health Procedures (ReFerence 8),

however, not included in the base document is the applicability of this guide to smearable contamination only.

Attachment G OCEOURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.1 13.14.1-14 oF 15 WP 593 RI (9 83)

~ lg

'I

'iC e

d'f 1

4

STATE SURFACE RADIOACTIVITY CONTAMINATION GUIDE + [dl Areas and/or items. that have radioactive contaminants exceeding the levels specified in this guide shall be decontaminated, restricted from access and/or use by the public, or removed, packaged, and disposed of as radioactive waste.

This guide also applies to personnel that may become contaminated.

ITEM ACTION;LEVEL ACTION V

1. Personnel Less than 100 cpm(b) Unconditional release.

100-1000 cpm(b) Decontaminate if time a 1 1ows; may be re leased without decontamination if necessary; Greater than 1000 cpm(b) Decontamination required.

2. Personal Belongings Less than 1000 cpm(b) Unconditional use.

,(Except Clothing),

Equipment, Tools, Greater than 1000 cpm(b) Decontaminate; hold for Vehicles, Other and/or equal to or radioactive decay or Materials/items greater than 1 mR/hr disposal as radioactive I

waste.

3. Areas (Equal to or [e]) Uncontrolled access to Less than 1 mR/hr area. Limited precautions Less than .2 uCi/m2 may be recommended.

(alpha)

Greater than 1 mR/hr Control access to area (Greater than [e]) until decay to below

.2 uCi/m2-6 uCi/m~ these levels or (alpha) decontaminate area.

[a] Above background.

[b] At 1/2 inch, using a beta-gamma pancake or thin-end window G-M survey meter; cpm = counts per minute as read from the survey meter.

[c] dpm = disintegrations per minute, determined by correcting the cpm observed by the appropriate background, efficiency, and geometric factors for the counting instrument used.

[d] Excerpted from state Department of Health Procedures (Reference B)

[e] Not included in base document.

+ The purpose of this guide is only to indicate if surface contamination is about or below the established levels.

Attachment H ROCEDURE NUMBER REVISIGN NUMBER PAGE NUMBER 13.14.1 13.14.1-15 of 15 Wt 598 R1 (983)

%4%HIWQeIIK eI 1I Ie' iiN~ ~

b3 SUPPLY SYSTEM PLANT PROCEDURES MANUAL WNP-2 PROCEDURE NUMBER APPROV D 13.14.3 04/28/89 Vol.UME NAME 13 EMERGENCY PLAN IMPL ENTING PROCEDURES SECTION 13.14 SUPPORTING INFORMATION PROCEDURES SUPPLY SYSTEM HEALTH PHYSICS PROCEDURES, RADIOLOGICAL PROGRAMS 13.14.3 INSTRUCTIONS, AND ENVIRONMENTAL PROGRAMS INSTRUCTIONS 13.14.3.1 ~Pur ose This procedure provides instructions on the use of Health Physics Proce-dures from the Plant Procedures Manual, the Radiological Programs In-structions Manual, and the Environmental Programs Instruction Manual for emergency activities. This guidance is divided into three parts, apply-ing to Health Physics Procedures in the Plant, Radiological Program Instructions in .the Emergency Operations Facility, and Environmental Programs .Instructions.

13.14.3.2 References A. MNP-2 Plant Procedures Manual, Volume No. 11, "Health Physics Procedures" B. Radiological Programs Instruction Manual C. Environmental Programs Instruction Manual 13.14.3.3 Procedure A. Plant Emer enc Activities Action Radiation Protection Manager 1. Utilize the applicable Health Physics Proce-Health Physics/Chemistry dures in Volume No. 11 of the Plant Proce-Personnel dures Manual during emergency situations During a declared emergency, refer to the Special Instructions and Modifications, Attachment A, for details of. the projected PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.3 5 13.14.3-1 of 8 WP.597 R3 {2/88)

Res onsibilit Action Radiation Protection Manager changes to Volume No. 11 of the Plant Health Physics/Chemistry Procedures Manual (normal Health Physics Personnel (cont'd) Procedures) during emergency activities.

Refer to Attachment B for projected changes of RPI's which may effect plant Health Physics operations.

Radiation Protection 2. Review and approve changes to the normal Hanager (RPH) practices specified in the Health Physics Procedures as outlined by Attachment A.

B. Emer enc 0 erations Facilit Activities Res onsibi lit Action Radiological Emergency l. Utilize the listing of procedures and Manager/HUOAC Staff (to instructions in Attachment B for guidance include State and applicable to the work performed at the Federal Representatives Emergency Operations Facility.

2. Take the 'appropriate actions in the listed procedures and instructions in Attachment B. This is a compilation of procedures applicable to emergency activities, and the Special Instructions column details modifi-cations to the procedure. This column also provides additional guidance and criteria for use of the procedure.

Radiological Emergency 3. Review and approve changes to Supply System Manager (REM) procedures used in the Emergency Operations Facility as authorized by Attachment B.

C. Offsite Emer enc Activities Res onsibi lit Action Radiological Emergency 1. Review the listing 'of procedures and Manager/Environmental Field instructions in Attachment C for guidance

, Monitoring'eams/ applicable to the work performed in the Offsite Recovery Teams field.

PROCCOURC NUMSSR RCV SION NUMIIKR PROD NUMSER 13.14.3 13.14.3-2 of 8 WPiS ~ S Rl {SiSS)

Res onsibilit Action Radiological Emergency 2. Take the appropriate actions to perform the Manager/Environmental Field ,Field Team/Recovery Team activities.

Monitoring Teams/ Attachment C is a compilation of the Envi-Offsite Recovery Teams ronmental Programs Instructions applicable (cont'd) to Emergency Field Team activities. The Specia1 Instructions column of Attachment C provides, details of the modifications to the procedures and additional guidance.

Radiological Emergency 3. Review and approve changes to Offsite Field Manager Monitoring and Recovery Team procedures as outlined by Attachment C. Approval of procedures will be a coordinated effort between the Supply System and Washington State DSHS.

13.14.3.4 Attachments A. Plant Health Physics Procedures Modifications for Emergency Activities

8. Radiological Programs Instructions (RPIs) App'licable for Emergency Operations Facility Emergency Activities C. Environmental Programs Instructions (EPIs) and Health Physics Procedures Modifications for Offsite Emergency Activities PROCKOURK NUMBKR RKVIKIONNUMBKR PAOK NUMQKR 13.14.3 13.14.3-3 of 8 WP Sll R'I Ilill)

0 HTA 0

0 PLANT IIEALTII PHYSICS PAOCFOUAFS MOOIFICATIOHS FOR OHSITE EMERGEHCY m ACTIVITIES' 0

C CD m

i PPII P P Procedure Title P '" ecial Instructions and Nodlfications m 11.2.2 AIAAA m

~ m 11.2.2.1 ALARA Procedures ARP, Radiation Protection All Objectives of the Supply Systan ALAAA policy are to be maliitalned through AI, Exposure Accounting, Manager (RPN) throughout the emergency. Ilowever, the necessity for prompt action 11.2.2.8 etc. during the anergency prohibits formal ALARA evaluation and docgnented exposure planning. AIARA activities will be determined by Supply System Emergency Management.

m 11.2.5 PERMISSIBLE EXPOSURE LIMITS P 0 \

2 2 11.2.5.1 Personnel Exposure Radlatlon Protection All Emergency exposure limits, guides and authorization scheme are In EPIP .

am',

C Limits and Guides Manager (RPN) 13. 14. I, "Emergency Exposure Levels/Protective Action Guides . Honaal +

u CO m limits=and guides are reestablished when the recovery phase ls declared.; .

Q 4'xposure 11.2;5.2 Authorization to Exceed See EPIP 13.14.1 "Emer- All: See Authorization scheme and levels ln EPIP 13;14.1 "Emergency Expo:

Mnlnlstrative Exposure gency Exposure Levels/ sure Levels/Protective Action GuidesaP P"

m 0

2 Guides PAG's For Limits of"-;

Authorltles. P P

Q

~ "..L-P 3l 11~27 '" - AREA COHTROL AHD LINITS -.- C, 'P fA Xl .

P+

11;2.1:I -- Area Postings - Radiation Protection Alert," Site; Area, : Hoimai; Health;Physlci PProcedures do'not apply. Post the'ighest Manager (RPN) General dose rate reading along with date and time on the door/entrance way

.!'1.2.1.2 to each area entered lf time permits. Ilonnai area posting will be Entry Into, Conduct In, Radiation Protection Alert, Site Area, reestabllshed at the beglnnlng of the recovery phase.

and Exit Free Controlled Areas Manager (APN) General Note: Access control ls to be malntalned for entry Into anergency areas.

g-11.2.7.4 Discrete Radioactive Radiation Protection Alert, Site Area, This procedure may be modified or suspended verbally by the Radiation Particle Control Manager (RPM) General Protection Manager as necessary but normally will remain in effect.

Cpa I. 11.8 RAOIATIOH WORK PERMIT I

I. I I. 8 Radiation Work Permit Radiation Protection Alert, Site Area, The Radiation Wor'k Permits in effect are suspended. Radiation Work Manager (RPM) General Permits will bi. replaced by <<ontlnuous monitoring by Ilcalth Physics Technicians or as directed by the Radiation Protection Manager.

Honnal Radiation Work Permit use will bc rccstablishcd for the recovery phase.

i This attaclvnent is a conyllation of procedures that are modified during emergencies at the nuclear facility. All other applicable llealth Physics Procedures vill be used in the normal manner.

i i Plant Procedures Manual.

0 ATTACIRIEIIT A (contd.)

rl 0

C PLNIT IIEAL)II PIIYSICS PROCEOURES MODIFICATIONS FOR OIISIIE ENFRG FNCY AC I IVITIESP Pl PPM Ir S eclal Instructions and Modifications GO i

Pl 11.2. 13 RAOIOlOGICAL SURVEYS 11.2. 13.1 Olrect Area Radiation and Radiation Protection Alert, Site Area, Contamination and radiation surveys will be made as directed by the Contamlnatlon Surveys Manager (RPII) General Radiation Protection Manager. Norma) routine area surveys will be discontinued and replaced by surveys requlrcd to support emergency activities.

Pl 11.2. 13.3 Personnel Decontamination Radiation Protection Alert, Site Area, Illgher contamination levels can be allowed by the Radiation Protection

( Survey Manager (RPM) Genera I Nanager pursuant to FPIP 13.10.4. Documentation requirements remain ln effect.

0 2

2 11.2.14 REC~EIPT STO~RAGE ANO C

)RANSFER OF RADIOLOGICAL Q

Pl MA)ERIAL 11.2. 14.3 Storage of Radioactive Radiation Protection Alert; Site Area, Normal storage requirements suspended. Supply System Radiation Pro-Material Manager (RPM) General tection Manager and Radiological Emergency Nanager will provide guid- I ance and requirements. XI 11.2. 14.8 Transfer of Radioactive Radiation Protection Alert, Site Area, Transfer of radioactive material under normal operating procedures Q Materials Between Nanager (RPN) General (samples) between the plant and Emergency Operations Faci)ity will be Facilities suspended, Logs oF sarrp)es sent to the Emergency Operations Facility for analyses are to be kept. Transfer betwren the plant and Finer-Pl gency Operations Faci) I ty wl1) be directed by thc Radiation Protect'ion Manager and the Radiological Emergency Managir.

Q 11.2. 15 CONTANINATION CONIROL 11.2.15.2 Skin Decontamination Radiation Protection Alert, Site Area Iligher contam'Ination levels can be allowed by the Radiation Protection.

Manager (RPM) General Manager pursuant to EPIP 13. 10.4. Ooclrnentatlon rcqulrrinents remain in effect.

I C4 11.2.15.5 Area Oecontaminat Ion. Radiation Protection A)crt, Site Area, Ccntamlnatlon boundary limits vill remain unchanged. Other allowable Manager (RPN) General levels will hc determined by the Radiation Protection Manager, based on thc need for entry into or control of areas. Norma) Ilralth CP 1 Physics practices will bc used For Recovery activities.

Vl 11.2.15.1 Release of Material Free Radiation Protection Alert, Site Area, Norma) procedures wll) bc suspended. Requirements will be estab-Radlologlca))y Contro))ed Manager (RPN) General lished by the Radiatlnn Protection Nanager and Radio)oglcal Finergency Areas Nanager.

l )his attadrnent Is a conyilatlnn oF procedures that are rnodiflcd during emergencies at the nuclear facility. AI) other appllcahle Nea)th I'hysics Procrdurrs vill be used in the norma) manner.

i edt 0 adp 0 ATTACIAIENI B yct 0

RAOIOIOGICAL PAOGlVIIS INSIAUCTIOHS+APis~APPLICABLE FOR DIERGEHCY OPERATIONS FACILITY EIIERGEHCY ACTIVIIIESt Cpa

~acedure'd Procedure patte S eclaI Instructions and IIodifications CI m

4.0 EXTERIUIL DOS IHETAY CcO RPI 4.9 Routine Exchange of Aadiologlcal Emergency Site Area, Normal TI.O badge changeout will be suspendi.d. Special emergency Personnel TI.D Badges Hanager (REII) and General badge exchanges will be made as necessary.and personnel held out of Radiological Protection areas until results have been determined. Io carply with the emer-Hanager (RPII) gency exposure levels as listed in EPIP 13. 14. I, "Imrgency Exposure

ÃI levels/Protcctlve Action Guides", the Radiation Protection IIanager m wili determine the badges that need to be exchanged in the plant and the Radiological Emergency Hanager will dctenn1ne badges that need to 0 be .exchanged in the Emergency Operations Facility. Normal routine 2

2 exchanges will be reestablishcd when the recovery phase is declared.

C X

RPI 4.11 Processing, Evaluating, Rad'iolog i ca I Emergency All Hethods of reporting exposures to emergency personnel will be deter-

. A m

and Reporting Extremity Hanager (REN) mined by the Radiological Emergency Hanager. Homal RPI m'ethods wil Lh Tlgs be recstabllshed when the recovery phase is declared.

RPI 4.12 Processing, Evaluating, Radi ologl ca'I Emergency Al 'I Normal practices will be used for processing and reporting TLO gg n and Reporting Results Hanager (REN) results. The Radiological Emergency Hanager, in consultation with 2 of Enviromncntal TIOs the State DSIIS, will determine the need for recovery of TLOs from t C oFfsite environmental TLD locations.

Xl HPD 3.1.2 As Low As Reasonably Radiological Emergency All aejecttucc op tha supply cyctaa dtltlm pot tcy are to ue matatataed III~

Achievable (AIARA) / Hanager (REII) throughout the emergency. However, the necessity For prompt action gg during the emergency prohibits formal ALAAA evaluation and docancntcd exposure planning. AlARA activities will be determined by Supply Emergency Hanagement.

Q Ql'ystem IIPO 3.1o5 "

Permlsslb'le Exposure Radiological Emergency All Fsergency exposure limits, guides and authoiization scheme are in EAIP I.iml ts Hanager (REII) 13.14.1, "Emergency Exposure levels/Protective Action Guides". HorsRC exposure llmlts and guides are reestablished when the recpvery phase is cdeclared.

Co RPI 12.1 Radiation Work Permit Radiological Emergency Alert, Site Area, 1he Radiation Work Permits in effect are suspended. Radiation Work Hanager (REII) General Permits will be replaced by continuous monitoring by Health Physics Caa Technicians or as directed by the Radiological Emergency ttanager.

I Cxt Noreal Radiation Work Perm'it use will be reestabllshcd for the recovery pltase.

i This attachment ls a contpilatlon of procedures that are modified during emergencies at the nuclear facility. All other applicable Ilealth Physics Procedures will be used in the normal manner.

pI Plant Procedures Hanual.

Ik D

0 ATTACIRIENT 6 (cantd.)

~ 0 n m

0 C RADIOLOGICAL PROGIIAIIS IINIIIIIC1INIS lIIPlll APPLICIIOIE FOR EMEIIRENCY OPERAYINIS FACll~ll EIIERGEIICY IICIIIIIYIESI ill c Proceduce I Procedure Tit)e 5 ecial Instructians and Nodiflcatinns X

RPI I2.29 Posting oF Control Areas Radiologica) Fmcrgcncy Alert, Site Area, Normal Nealth Physics Procedures do not apply. Post the highest Xl Nanager (REN) General dose rate reading along vith date and time on the door/entrance vay to each area affected if time permits. Norma) area posting will be RPI 12.30 Fntry Into, Conduct ln, Radiolog'ical Emergency Alert, Site Area, reestablished at the beginning of the recovery phase.

and Exit Fram Controlled Nanager (AEN) General Nate: Access control is to'be maintained for entry into emergency Areas areas.

m RPI 12.33 Decontamination of Mark Radiological Emergency Alert, Site Area, Contam'ination boundary limits uill remain unchanged. Other allowable Areas Nanager (AEN) General levels uill be determined by the Radiological Fmergency Nanager, 0 based on the need for entry into or contro) of areas. Norma) Nealth 2 Physics practices wl)1 be used for Recovery activities.

2 C

X CE API 12.34 Oecan of Personnel Radiological Emergency hlert, Site Area, Nigher contamlnatlon levels can bc allowed by the Radio)aglcal ill Nanager (AEN) General Emergency Nanager pursuant to EPIP 13.11.1. OacunentatialC

- requlrancnts remain in effect.

EE RPI )2,31 Transfer of Radioactive Radiological Emergency A)crt, Site Area, Transfer of rad'ioactlve mater'lal under normal operating procedures Naterials Oetueen Nanager (REN) General (samp)es) between the plant and Emergency Operations Facility will be Facilities suspended. togs of savy)es sent to the Emergency Operations Faci) lt for analyses are to be kept. Transfer between the plant and Emcr gency Operations Fac))ity ulll be directed by the Radiatioi Protection Nanager and the Radiological Emergency Nanager. I FA RPI 12.39 Release of Naterlal 'From Radiolgical Emergency A)crt, Site Area, Normal procedures wil) be suspended. Requirements ui)l he estab-Radio)oglcal)y Controlled Nanager (RFN) General lished by the Radiation Protection Nanager and Radiological Emergency Areas Nanager.

A RPI 12.40. Radiation/Contamination Radiological Emergency A)crt, Site Area, Contamination and radiation surveys vl) I be made as directed by the C Surveys Nanager (REN) Genera) Radiological Emergency Nanager. Norma) routine area surveys vill he@

discontinued and replaced by surveys required to support ancrgen~

activities.

G Col RPI 12.53 Personnel Contamination Radiological Finergcncy Alert, Site Area, Nigher contamlnatlon 1cvels can be a)lowed by the Radio)oglcal Survey Nanager (REN) General Emergency Nanager pursuant to EPIP 13. 11.1. Dnclvtsentat)on ca requirements remain ln effect.

I RPI 12.51 Storage of Radioactive Radio)ogical Emergency A)crt, Site Area, Norma) starage rcqulrancnts suspended. Supply Systan Radiation Pro-O Nater)al Nanager (RFA) General tection Nanagcr and Radlologlca) Emergency Nanager will provide guid-ance and requirements.

ln thc norma) manner.

'I "r

~ ~ I I I ' I I ~ ~ I

~ ~

I ~ ~ I ~ I I I I ~ I ~ I ' I ~ ~ ~

~ ~ ~ ~ I ~

~ ~ I . ~

~ I ~ ~ I ~

' I ~ \ ~ I ', ~ ~ ~ ~ ' ~

I . ~

I' I \ I I ~ ~

I ~ I . ~

I I ~ I I I~ . I ~ . ~ I I \

~ ~ ~ '

~ I I

~ I I ~ ~ I \ ' ~ ~ ~ . ~ ~ ~ ~ I

~ ' ~ ~ ~ ~ ~ I~ ~ I ~

I I I ~ I ~ ~ ' ~ ~ ~

~ ~ . ~ ~

I ~ ~ ~ I~ ~ I ~

~ ' ~

~ ~

I . I ~ '

~ ~ ~ ~ ~ I I

~~ I I, I

~4

~ I' ~ ~

I 'I '

<< ~ ~ ~ \. II

~ ~ \ ~ ~ I '

~ I I I I '

I ~

pf II4%HIWrellI ~4 elle ell'e ~ e 4J SUPPLY SYSTEIVI PLANT PROCEDURES MANUAL WNP.2 PROCEDURE NUMBER 13.14.4 VOLUME NAME Apeeoveo g~~ DATE 03/22/90 13 EMERGENCY PLAN IMPLEMENTING PROCEDURES SECTION 13.14 SUPPORTING INFORMATION PROCEDURES TITLE 13.14.4 EMERGENCY EQUIPMENT 13.14.4.1 ~Per ose This procedure describes requirements For inspection, inventory, and functional testing oF emergency equipment and supplies which are not maintained under other approved procedures. Quantities distinguish between items that are required, which must be present; and items that are desired, which may be present to enhance emergency operations.

13.14.4.2 References A. EPIP 13.14.9, Emergency Program Maintenance B. NUREG 0654 13.14.4 ' Procedure Res onsibi lit Action Supervisor, Health Physics, l. Ensure that the following cabinets are tt1lNP-2 checked in accordance with the instructions outlined in Attachment A, "NNP-2 Emergency Equipment".

Radiolo ical and Fire Emer enc Cabinets Locations:

o Kit lE Service Building, Operations Support 441'levation, Center (OSC).

o Kit 2E - 441'levation, Radwaste Reactor Building Corridor Junction.

PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 13.14.4-1 of 91 WP 587 R3 (2/88)

I+)

k T

"qa

Res onsibi lit Action Supervisor Health Physics, o Kit 3E - 471'levation, Radwaste/

WNP-2 (Cont.) Turbine Generator Building Corri-dor.

o Kit 4E 501'levation, Radwaste/

Turbine Generator Building Corri-dor at Control Room door.

o Kit 5E 487'levation, Radwaste Building outside Chemistry Laboratory.

Decontamination Kits:

Locations:

o Kit 10 - Service Building, 441'levation, Access Control.

o Kit 2D - Radwaste Building, Locker, 487'levation,=Decontamination Men's Locker Room.

o Kit 30 Radwaste Building, Decontamination Locker, 487'levation, Women's Locker Room.

First Aid Kits:

Location:

o Kit 1FA - 441', Service Building, First Aid Room.

Kit 2FA 487'levation, Radwaste Building, Health Physics Office.

Kit 1FB 441'levation, Service Building, Operations Support Center (OSC) o Kit 2FB 441'levation, Rad'-

waste/Reactor Building Corridor Junction.

o Kit 3FB - 471'levation, .Rad-waste/Turbine Generator Building Corridor.

~

  • PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-2 of 91 WP 508 Al (9.83)

~k pt

CQMmQLLEG CQPY Res onsibi lit Action Supervisor Health Physics, o Kit 4FB - 501'levation, Radwaste WNP-2 (Cont.) /Turbine Generator Building Corr-idor at Control Room Door.

o Kit 5FB - 4B7'levation, Radwaste Building outside Chemistry Labor-atory.

~

Emer enc Protection Kits:

Location:

o Kit EPK Technical Support Center

2. Completed record forms are to be forwarded to the Manager, Emergency Planning.

Shift Manager. 3. Ensure that the following alarm systems are demonstrated in accordance with the instructions outlined in Attachment A, "WNP-2 Emergency Equipment."

Plant Exclusive Use Si nals:

Location: Control Room o Alerting Tone o Immediate Evacuation Alarm

4. Complete record forms and forward them to the Hanager, Emergency Planning.

Supervisor, Radiological 5. Ensure the following are checked in Accor-Services dance with the instructions outlined in Attachment B, "Emergency Operation Facility, Emergency Equipment".

Field Monitorin Kits:

Location:

o Plant Support Facility and Headquarters PROCEDURE NUMBEA REVISION NUMBER PAGE NUMBER 13.14.4 9 13,14.4-3 of 91 WP.598 AI (9 83)

4l E1 1j 1

CQNIQLLED CQPY Res onsibi lit Action Supervisor, Radiological Oecon Stora e Trailer:

Services (Cont.)

Location:

o Plant Support Facility River Evacuation Kits:

Location:

o Headquarters Aerial Monitorin Kit:

Location:

o Headquarters E ui ment for PASS:

Location:

o Ambulance Bay o Counting Room o Chemistry Lab

6. All completed record forms are to be for-warded to the Manager, Emergency Planning.

Supervisor, Communications 7. Ensure that the Communications Systems are Services checked in accordance with the instructions outlined in Attachment E, "Communications System".

8. Completed record forms are to be forwarded to the Manager, Emergency Planning.

PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-4 of 91 WP 59$ RI (0 83)

1 gg

,4

Res onsibi lit Action Assigned Personnel 9. Ensure the following emergency centers are (As Listed Below) checked in accordance with the instructions outlined in Attachment G, "Emergency Center Equipment and Supplies". Completed record forms are to be forwarded to the Hanager, Emergency Planning.

Manager, WNP-2 Operations o Control Room Manager, WNP-2 Administration o Technical Support Center o Operations Support Center o Alternate Operations Support Center Manager, WNP-2 Modifications 8 o Supply System Decision Center Upgrades (Site Support Manager)

Hanager, Security Programs o Security Decision Center o EOF Communications Center o H(} Communications Center Senior Specialist, State Liaison o Offsite Agency Coordination Center (Offsite Agency Coordinator)

Manager, Generation Engineering o Technical Data Center Manager, Records Management o EOF Records Rooms Manager Radiological Programs o Meteorology and Unified Dose and Instrument Calibration Assessment Center (Radiological Emergency Manager)

Senior Media Coordinator o Media Briefing Preparation Area (EOF Public Information Officer)

Manager, Emergency Planning o NRC Work Area Manager, Facilities Services o Crisis Management Center (Hg Administrative Support Supervisor)

Director, Administration 5 o Joint Information Center Information Services (Joint Information Center Director)

PROCEDURE NUMBER REVISiON NUMBER PAGE NUMBER 13,14.4 13.14.4-5 of 91 WP.598 R1 (9 83)

~ I J t

~r t,

I;

'it

Res onsibi 1 it Action Hanager, Health and Sciences 10. Ensure that the Emergency Operations Facility Medical Equipment and supplies are checked in accordance with Attachment F, "EOF Emergency Medical Equipment and Supplies".

ll. Completed record Forms are to be forwarded to the Manager, Emergency Planning.

Manager, Emergency Planning 12. Ensure the following cabinets are checked in accordance with the instructions out-lined in Attachment C, "Hospital Radiolog-ical Emergency Kits".

Hos ital Radiolo ical Emer enc Kits Locations:

o Kadlec Hospital, Emergency Room .

Storage Cabinet o Kennewick Hospital, Emergency Room Storage Closet o Our Lady of Lourdes, Decon Shower Room o Yakima Valley Memorial, Autopsy Room

13. Ensure the Emergency Telephone Directory is maintained in accordance with the instruc-tions outlined in Attachment 0, "Emergency Planner Communications System Tests".
14. Ensure the dedicated telephone lines are checked in accordance with the instructions outlined in Attachment 0, "Emergency Planner Communications System Tests".
15. Monitor compliance with this procedure's

. requirements, take action to insure dis-crepancies are corrected, and maintain auditable records oF performance of all required checks.

PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 13.14.4-6 of 91 WP 598 RI I983)

lP

> g1 4 ITEMS IN/NEAR FIELD SAMPLING KIT 'TEM QUANTITY Case for Equipment Plastic Bags (assorted) 60 Cubitainers (1 gallon) 15 Rubber Gloves 4 pair Digging Tools (small) 3 Felt Tip,Marker (perm). Note Pads (3x5) Pens (black) Masking Tape (2") 1 roll Cutting Shears Rubber Bands 1 box Paper Towels 1 pkg. 01sposabl e Gloves 2 boxes Smears and Holders 100 Radiation Signs Barricade Tape 1 roll Pocket Knife 1 Syphon Pump Environmental Program 1 set Instruction Manual, Contains only Section 12, Radiological Monitoring Program Procedures Attachment B-1 Page 1 of 2 PROCEDURE NUMBER REVISlON NUMBER PAGE NUMBER 13.14.4 9 13.14.4-22 of 91 VSP.598 A1 (9 N) II g I CQIMTIRQLLEO CQPY INSTRUCTIONS FIELD SAMPLING KIT Locations: o Kit 1FS - Field Team Cabinet Number 1, PSF Ambulance Garage o Kit 2FS Field Team Cabinet Number 2, PSF Ambulance Garage o Kit 3FS Field Team Cabinet Number 3., PSF Ambulance Garage o Kit 4FS - Headquarters, Cabinet Number 4, Headquarters MPF, 1st Floor, Room 201 '~oarterl (or if seal not intact): o Inventory contents and ensure required quantities are correct. o Check physical condition of contents and replace as necessary. . o Inspect Environmental Program Instruction Manual, Section 12 Procedures for latest revision and replace as necessary. Attachment B-1 Page 2 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-23 of 91 WP.59S Rl (9 83) P 'W f~ ITEMS IN/NEAR PROTECTIVE CLOTHING KIT ITEM 9UANTITY Case for Equipmen't Hoods Paper Coveralls Rubber Gloves 3 pair Rubber Boots 3 pair Masking Tape (2") 2 rolls Full-Face Respirators with Cartridges Rain Suits Razor and Shaving Cream 1 set Plastic Bags Assorted Skull caps Cotton glove liners 1 pkg. t PROCEDURE NUMBER WP 598 Rl (9 83) 13.14.4 REVISION NUMBER 9 Attachment B-2 Page 1 of PAGE NUMBER 2 13.14 '-24 of 91 C; ~l "E ~ gg gi INSTRUCTIONS PROTECTIVE CLOTHING KIT Locations: o Kit 1PC Field Team Cabinet Number 1 o Kit 2PC Field Team Cabinet Number 2 o Kit 3PC Field Team Cabinet Number 3 o Kit 4PC Headquarters ~Nonth1 o Check condition of respirators ~oarterl (or if seal not intact): o Inventory contents o Check physical condition of contents and replace as necessary Attachment B-2 Page 2 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-25 of 91 WP 598 Rl (9KII ~r It 't Lt:QIMmQLLEO lt:QPV ITEMS IN/NEAR AIR SAMPLING KIT ITEM gUANTITY Case for Equipment 1 Portable Air Sampler 1 Paper Filters 100 Note Pads (3x5) Pens (Black) Charcoal Cartridges Tweezer Silver Eeolite Cartridges H809C Manual Spare Fuse Stopwatch Alligator Forceps Attachment B-3 Page 1 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9. 13.14.4-26 of 91 wP.59$ R1 I9 aII I INSTRUCTIONS AIR SAMPLING KIT Locations: o Kit 1AS Field Team Cabinet Number 1 o Kit 2AS Field Team Cabinet Number 2 o Kit 3AS - Field Team Cabinet Number 3 o Kit 4AS Headquarters ~narterl (or if seal not intact): Inventory contents Check physical condition of contents and replace as necessary Verify air sampler calibration date will not be exceeded prior to the next quarterly check Start-up air sampler Perform operational check of stopwatch. Attachment 8-3 of e PROCEDURE NUMBER REVISIGN NUMBER Page 2 PAGE NUMBER 2 13.14.4 9 13.14.4-27 of 91 WP 598 Rt (983) ITEHS IN/NEAR INSTRUMENTATION KIT ITEM gUANTITY Case for Equipment Dose Rate Heter (HicroR) Dose Rate Meter ( Ion Chamber) Count Rate Heter (w/G-H Pancake Probe) 1 Pocket Dosimeter (0-5 R Range) 3 Pocket Dosimeter. (0-500 mR Range) 3 Dosimeter Charger 1 TLD Badges 2 Portable Radio and microphone 2 (Headquarters kit only) AC Radio Charger 1 Check Source Cs-137 1 Desiccant 1 Iodine Tablets 3 sets Calculator and charger 1 0-Cell Batteries 9-Volt Batteries 2 Battery (6-volt) 1 Note Pads (3x5) 3 Pens (black) 3 Phillips Screwdriver 1 Compass 1 Battery Lantern (6-volt) 1 Flashlight 1, First Aid Kit (In Cabinet) 1 Clipboard with the following (In Cabinet): 1 10 mi Zone Hap-Book Emergency Response Log - S-l/2 x 11 Tablet WA State Road Atlas ( In Cabinet) Expandable Folder/Worksheet Packet Containing (In Cabinet) Useful Phone Numbers Change $ 5.00 Credit Cards 3 (1 Each: Shell, Chevron, Mobil) - Set Field Team Worksheets: - Checklist for Equipment Test 2 Exposure Rate Measurement Workshe et 20 Contamination Survey Worksheet 10 - Environmental Sample Idenfication Form 20 -*Wood Stakes, Survey Markers 10 Attachment 8-4 Page 1 of 3 PROCEOURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-28 of 91 1 WP 59$ R1 (9 83) lI I> I lf ~ 14 t:QNTRQLLED CQPY ITEMS IN/NEAR INSTRUMENTATION KIT (Continued) ITEM gUANTITY - Air Sampling Worksheet 20 - Aerial Radiological Survey Oata Sheet 5 - Aerial Monitoring Aircraft Crew Exposure Record 10 After Action Report 5 Personnel Contamination Report 5 - Personnel Clothing Contamination Report 5 Set of Fi el d Team P rocedures Listed Below: (In Cabinet) EPIP 73.9.1 "Envi ronmenta 1 Fi el d Team Ope rat ons" - EPIP 13.9.2 "Field Exposure Rate Surveys" i EPIP 13.9.3 "Portable Air Sampling" - EPIP 13.9.4 "TLO and Fixed Air Sample Retrieval" EPIP 13.9.5 "Environmental Sample Collection" EPIP 13.9.6 "Field Analysis of Environmental Samples" EPIP 13.9.7 "Aerial Monitoring" EPIP 13.13.4 "Post Incident Reporting" EPIP 13.14.4 "Emergency Equipment" Excerpt, Attachment 8 "Emergency Operations Facility Emergency Equipment" RPI 12.53 "Personnel Contamination Survey" Attachment B-4 Page 2 of 3 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-29 of 91 WP.$ 98 R1 (9 N) +l h pi INSTRUCTIONS INSTRUMENTATION KIT Locations: Kit 1IK Field Team Cabinet Number 1 Kit 2IK Field Team Cabinet Number 2 Kit 3IK Field Team Cabinet Number 3 Kit 4IK Headquarters S~ionthl Verify that blank sign-in and sign-out forms (similar to Attachments H and I) are inside the emergency cabinet door, and a copy of EPIP 13.14.4 "Emergency Equipment", Attachment 8-4, is available inside the kit. Replace radios and batteries in Headquarters Kit (obtain replacement radios and batteries from radio/battery charging unit in PSF Room 118A cabinet next to decon showers and deliver replaced radio/ batteries to Telecommunications for operational check.) Verify that all procedures are the current revision and worksheets are similar to the current revisions and have not been written on. ~uarterl (or if seal not intact): Inventory contents Check physical condition of contents and replace as necessary Verify portable instrument calibration dates will not be exceeded prior to the next quarterly check: Perform operational checks: o Pocket dosimeters (rezero) o Portable instruments (battery check) o Oosimeter charger o Ca cul ator 1 o Battery lantern o F1 ashl i ght Verify expiration dates will not be exceeded prior to the next quarterly check: o Credit card" o Iodine tablets Attachment 8-4 Page 3 of 3 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBFR 13.14.4 13.14.4-30 of 91 WP 59$ Rt (9 83) Jl I' CQNTRQLLED CQPY ITEMS IN/NEAR MULTICHANNEL ANALYZER KIT ITEM gUANTITY Case for Equipment Multichannel Analyzer NaI Detector Lead Shield Holder and Trays Check Source 8a-133 Check Source Cs-137 Note Pads (3x5) Pens (black) MCA Data Sheet Davidson Model 10568 Instruction Manual Abridged Radiological Health Handbook EPIP 13.9.6, Attachment D Portable Instrument Calibration Data Sheets 10 (desired quantity) Attachment 8-5 Page 1 oF 2 PROCEDURE NUMBER RF VIS lON NUMBER PAGE NUMBER 13.14.4 9 13.14.4-31 of 91 WP.598 Rl (9 83) IN INSTRUCTIONS MULTICHANNEL ANALYZER KIT Locations: o Kit 1HA Field Team Cabinet Number 1 o Kit 2HA Field Team Cabinet Number 2 ~oarterl (or if seal not intact): o Inventory contents o Check physical condition of contents and replace as necessary o Verify multi-channel analyzer calibration date will not be exceeded prior to next quarterly check o Perform operational check on multi-channel analyzer Attachment 8-5 Page 2 of 2 PROCEDURE NUMBER REVISlON NUMBER PAGE NUMBER 13.14.4 13.14.4-32 of 91 WP.SSB Rl (9 83) je kJ'~, CQNTRQLLED CQPY ITEHS IN/NEAR DECON CABINET ITEM gUANTITY Decon Record Forms 20 Clip board 1 Decon. Procedures (1 set of each) EPIP 13.7.4 "Personnel Decontamination Operations at the Emergency Operations Facility" EPIP 13.7.5 "Decontamination Operations, at Remote Decontamination Locations" EPIP 13.7.7 "Emergency Operations Facility First Aid Center Operations" EPIP 13.14;4 "Emergency Equipment" Excerpt, Attachment B Red markers Black markers Black ink pens 3" x 5" notepads Smears 1,000 Masking tape 1 Cotton tip applicators 2,000 Yellow magenta tape 1 Tongue depressants 20 Bottles Pax-land soap 2 Scrubbing sponges 2 Lava soap 1 Ivory soap 2 Soft scrub brushes 2 Hoist towelettes- 200 4" x 4" gauze sponges 200 3" x 3" gauze sponges 300 Scissors 1 Paper towels 500 Blank signs 5 Paper coveral 1 s 6 Rubber gloves 6 pr Plastic booties 20 pr Count Rate Heter (w/Alpha Probe) 1 Count Rate Heter (w/G-H Pancake Probe) 1 Yellow plastic bags 20 Clear plastic bags 20 Extra soap 2 boxes Potassium Permanganate 2 bottles Sodium Bisulfite 2 bottles Facial Tissue 1 boxes Colloidion 1 bottle Small Paper Cups 1 box Saline Solution 1 bottle Camera, Polaroid (Hod. Impulse) 1 Tape Recorder, Dictaphone (Hod. 1252) 1 Attachment B-6 Page 1 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-33 of 91 WP.588 81 (8 83) g~t INSTRUCTIONS DECON CABINET Location: o DC Emergency Cabinet Number 14, PSF Decon Shower Area ~Mont hi o Verify that all procedures are the current revisions and forms are similar to the current revision and have not been written on ~ ~uarterl (or if sea'I not intact): o Inventory contents o Check physical condition of contents and replace as necessary o Verify calibration/expiration dates will not be exceeded prior to next quarterly check: o Portable instrument o Chemicals o Perform operational check on portable instruments (battery check) Attachment 8-6 Page 2 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-34 of 91 ti I'v \ h ITEMS IN/NEAR EXTRA PROTECTIVE CLOTHING UANTITY Box for Equipment Paper Coveralls 25 Plastic Shoe Covers 20 Pairs Oisposable Gloves 1 Box Rubber Gloves 5 ~ Pair Hoods 12 Hasking Tape 5 Rolls Rubber Boots 2 Pair Attachment B-7 Page 1 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-35 of 91 WP 598 Bl (9 83) 4 ~! V A q n ~'n CQNTIRQLLED CQPY INSTRUCTIONS EXTRA PROTECTIVE CLOTHING Location: o Kit 1XP Emergency Cabinet Number 6, PSF Ambulance Garage o Kit 2XP Emergency Cabinet Number 6, PSf Ambulance Garage ~oarterl (or if seal not intact): o Inventory contents o Check physical condition of contents and replace as necessary Attachment 8-7 Page 2 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-36 of 91 T ~ t t."QNTRQLLED jt.QPY a ITEMS IN/NEAR FIELO LAB SUPPLIES ITEM gUANTITY 100 ft Extension Cord Air Sample Cart. Purger Radio Charger and Antenna Air Bottle (nearly full) Attachment B-8 Page 1 of 2 PROCEDURE NUMBER REVISION NUMBEA PAGE NUMBER 13.14.4 9 13.14.4-37 of 91 WP.598 RT (8 83) $p'(, b 1 0 INSTRUCTIONS FIELD LAB SUPPLIES Locations: o Kit 1FL Field Team Cabinet Number 1, PSF Ambulance Garage o Kit 2FL - Field Team Cabinet Number 2, PSF Ambulance Garage ~oar teri (or if seal not intact): o Inventory contents o Check physical condition of contents and replace as necessary o Verify air bottle is nearly full o Perform operational check on air sample cartridge purge manifold. Attachment 8-8 Page 2 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 13.14.4-38 of 91 WP 59SAl(983) ~ th ITEMS IN/NEAR PORTABLE GENERATOR SET ITEM gUANTITY Honda Generator Gas Can Siphon Spare Fuses: 8 amp 15 amp Tool Kit Manual Attachment B-9 Page 1 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13,14.4 9 13.14.4-39 of 91 WP.598 Rl (9 83) ,t C 'I CQNTRQLLED CQPY INSTRUCTIONS PORTABLE GENERATOR SET Locations: o Kit 1PG Emergency Cabinet Number 7, PSF Ambulance Garage o Kit 2PG Emergency Cabinet Number 7, PSF Ambulance Garage ~uarterl (or if seal not intact): o Inventory contents o Check physical condition of contents and replace as necessary o Start-up Honda generator. Attachment B-9 Page 2 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-40 of 91 WP 598 Bi (9 83) 1f t 'E 4 ITEMS IN/NEAR RIVER EVACUATION MONITORING KIT ITEM gUANTITY TLD Dosimeter Charger Pocket Dosimeter: 0-5 R 0-500 mR 0-50R Dose Rate . Meter RO-2A Micro R meter Check Source Respirators 3 KI Tablets 1 bottle Coveralls, paper 3 pairs Hoods Shoe covers 3 pairs Rubber gloves 3 pairs Surgical gloves 1 box Rain suits Tape, masking 1 roll Pens Portable Radio Radio headset Writing Tablet Personnel Exposure Record Emergency Response Log 1 Pad Procedures, 1 each -EPIP 13.5.4, Columbia. River Evacuation -EPIP 13,9.1, Environmental Field Team Operations -EPIP 13.9.2, Field Exposure Rate Survey -EPIP 13.9.8, River Evacuation Monitoring Attachment 8-10 Page 1 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-41 of 91 WP 598 R1 (9 aI) I' INSTRUCTIONS RIVER EVACUATION MONITORING KIT Location: o Kit 1RM Cabinet Number 4, Headquarters MPF, 1St Floor, Room 201 ~Month 1 Replace radio and checks radio and batteries. (Obtain replacement batteries from radio/battery charging unit in,PSF Room 118A cabinet next to decon showers and deliver replaced radio/ batteries to Telecommunications for operational ) Verify that blank sign-in and sign-out forms (similar to Attachment H and I) are inside the emergency cabinet door, and a copy of EPIP 13.14.4 "Emergency Equipment", Attachment 8-10, is available inside the kit. Verify that vehicle keys are in the cabinet, Headquarters, MFP, Room 201 Perform respirator check per RPI 8.3 Verify all procedures are the current revision and forms are similar to the current revision and have not been written on; ~uarterl (or if seal not intact): o Inventory contents I o Check physical condition of contents and replace as necessary o Verify calibration/expiration dates will not be exceeded prior ~ to next quarterly check. o Perform operational checks: o Portable instrument (battery check) Attachment 8-10 Page 2 of 2 PROCEOURE NUMBER REVISlQN NUMBER PAGE NUMBER 13.14.4 13.14.4-42 of 91 WP 598 Rl (983) "I tC*i 1C tlgq , Ifl l ITEMS IN/NEAR RIVER EVACUATION DECONTAMINATION KIT ITEM UANTITY TLD Dosimeter Charger Pocket Dosimeter: 0-5 R 3 0-500 01R 3 Bucket 1 Sponges 5 Soap 2 bottles Toweling, disposable 10 Ribbon, Rad. Barrier 2 rolls Signs, Rad. Warning w/inserts 4 Coveralls, paper 5 pairs Hoods 5 Shoe covers 5 pairs Rubber gloves 10 pairs Surgical gloves 1 box Rain suits 3 Tape 1 roll Plastic bags (50 gal. yellow) 2 Count Rate Meter (w/G-H Pancake Probe) 1 Check Source 1 Portable Radio 1 KI Tablets 1 bottle Survey Hap and Record Form 10 Personnel Contamination Form 10 Pens 5 Procedures 1 each -EPIP 13.5.4 -EPIP 13.7.5 -EPIP 13.9.1 -EPIP 13.9.2 -EPIP 13.9.8 -RPI 12.34 -RPI 12.53 Attachment B-ll Page 1 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 13.14.4-43 of 91 WP 598 R1 (9.8Q) ( "r S h'l I C, CQNTIRQlLILEG CQFf INSTRUCTIONS RIVER EVACUATION OECONTAHINATION KIT Location: o Kit 1RO Emergency Cabinet Number 4, Headquarters NPF, 1St Floor, Room 201 M~onthl Replace radio and batteries. (Obtain replacement radio and batteries from radio/battery charging unit in PSF Room 118A cabinet next to decon showers and deliver replaced radio/ batteries to Telecommunications for operational check.) Verify all procedures are the current revision and forms are similar to the current revision and have not been written on. ~narterl (or if seal not intact): o Inventory contents Check physical condition of contents and replace as necessary Verify calibration/expiration dates will not be exceeded prior to next quarterly check. o Perform operational checks: o Portable instrument (battery \ check) Attachment 8-11 Page 2 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9. 13.14.4-44 of 91 WP 59B Rl I9.83) S A) ITEHS IN/NEAR AERIAL HONITORING KIT ITEH gUANTITY TLD Dosimeter Charger Pocket Dosimeter: 0-5 R 0-500 mR 0-50R Dose Rate Heter RO-2A Micro R meter 1 Check Source 1 Portable Radio Writing Tablet Pens 2 KI Tablets 1 bottle Personnel Exposure Record Field Team Haps 1 set Emergency Response'og 1 pad Procedures 1 each '-EPIP 13.9.1, Environmental Field Team Operations -EPIP 13.9.2, Field Exposure Rate Survey -EPIP 13,9.7, Aerial Honitoring Attachment 8-12 Page 1 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER ~ 13.14.4 9 13.14.4-45 of 91 'pj g4 ,pi INSTRUCTIONS AERIAL MONITORING KIT Location: o Kit 1AM Emergency Cabinet Number 4, Headquarters MPF, 1St Floor, Room 201 M~onth 1 o Replace radio and batteries. (Obtain replacement radio and batteries from radio/battery charges uni t in Room 118A cabinet next to decon showers and deliver replaced radio/batteries to Telecommunications for operational check,) o Verify all procedures are the current revision and forms are similar to the current revision and have not been written on. ~narterl (or if seal not intact): o Inventory contents o Check physical condition of contents and replace as necessary o Verify calibration/expiration dates will not be exceeded prior to next quarterly check. o Perform operational checks: o Portable instrument (battery check) Attachment 8-12 Page 2 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14 ' 9 13.14.4-46 of 91 WP 598 R'I (983) ge vA yr jif ITEMS IN/NEAR OECON STORAGE TRAILER gUANTITY Stanchions 20 Rad. Rope 2 spools Rad. signs w/asst. inserts 20 Paper coveralls 4 cases Protective clothing 20 sets Rubber boots 10 pair Respirators, full-face 20 Rain suits 25 Plastic booties (yellow) 1 case Totes (shoe covers) 100 pair Rubber gloves 100 pair Cotton glove liners 200 pair Surgical gloves 5 boxes Ouct tape 20 rolls Check source 1 Count Rate Heter (w/G-H Pancake Probe) 3 Extra Probes/cables 3 Dose Rate Meter ( Ion Chamber) 2 Liquid soap 1 case Grannular hand soap 5 lbs Cotton applicators 1. box Envelopes (3" x 5) 1 box SUrgical scrub brushes 20 Smears 2 boxes Plastic bags (50 gal., yellow) 2 rolls Plastic bags (12" x 24", yellow) 1 roll Potassium Iodide (KI) 3 bottles Sodium Bisulfite,capsules, 100 Potassium Permangerate capsules 100 Sponges 50 Buckets 6 Toweling 2 cases Blankets 24 Collapsable water containers (1 gal) 5 Oosimeter Charger (with spare battery) 1 Vacuum Cleaners (12 volt) 3 Generator (Gasoline) 1 Fire Extinguisher 1 Attachment 8-13 Page 1 of 3 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14 ' 13.14.4-47 of 91 WP.598 RI (9 aI) tl y'4 4 4( i~' ITEMS IN/NEAR OECON STORAGE TRAILER (Continued) ITEM gUANTITY TLO's 4 Pocket Oosimeter (0-500 mR) 4 Generator Kit (with spare fuses) 1 Gasoline can 1 Syphon 1 Legal pads '1 box Pens 2 boxes Clipboards 5 Forms Survey Map and Record Forms 100 Yehicle Contamination Forms 10 Personnel Gontamination Forms 100 After Action Report 5 Emergency Response Log 1 pad Procedures 1 each -EPIP 13.7.5 Oecontamination Operations at Remote Oecontamination Locations -EPIP 13.7.9,. Oecontamination Within the Site Boundary -EPIP 13.13.4 Post Incident Reporting -EPIP 13.14.4 Emergency Equipment ( located on the'nside of trailer door) -RPI 12.34 Oecontamination of Personnel -RPI 12.36 Self Frisking -RPI 12.39 Release of Material from Radiologically Controlled Areas -RPI 12.40 Radiation/Contamination Surveys -RPI 12.53 Personnel Contamination Survey Attachment B-13 Page 2 of 3 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14 ~ 4 9 13.14.4-48 of 91 YYP 598 Rl (9 83I CQMTIRQLLEG CQPY INSTRUCTIONS OECON STORAGE TRAILER Location: o South behind the PSF H~onth'I o Check condition of .respirators ~oarterl (or if seal not intact): Inventory contents Check physical condition of contents and replace as necessary Verify calibration/expiration dates will not be exceeded prior to next quarterly check: o Portable instruments o Chemicals o Iodine Tablets Perform operational checks: o Portable instrument (battery check) o Oosimeter charger o Portable generator (Start-up) Verify all procedures are the current revision and Forms are similar to the current revision and have not been written on. Attachment B-13 Page 3 of 3 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-49 of 91 WP 59$ Rl I9.KI) v 4 I' E UIPMENT FOR PASS Locations: Hoist Crane (Ambulance Bay) Ramp (Counting Room) Handle for Cask (Counting Room) Tongs (Chemistry Lab) Syringes and Needles 'Chemistry Lab) Serum Bottles (Chemistry Lab) PH Heter Probe (Chemistry Lab) ~aarterl o Inventory contents o Check physical condition of contents and replace as necessary Attachment B-14 Page 1 of 1 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-50 of 91 +@1 / k" r, g Il CQIMTIRQlLED CQFr CONTENTS HOSPITAL RADIOLOGICAL EMERGENCY KIT ITEM gUANTITY Action Cards 1 setof 4 Body Outline Sketches 5 C 1 i pboa rd 1 Marking Pens 2 Masking Tape (2") 2 Rolls Paper or Plastic Floor Covering Assorted Paper Pads (Note Pads) 2 Pencils and/or Pens 6 Plastic (cover Air Inlets and equipment) Assorted Procedures 4 copies Radiation Control Signs 5 Radiation Rope Assorted Radiation Tags 5 Radiation Tape 1 Roll Scissor 1 Smears and Envelopes 25 Count Rate Heter (w/G-H Pancake Probe) 1 TLO's 6 and 1 Control Decontamination Kit 1 Set -Bulb Syringe -Ivory Soap -Hand Brush -Lava Soap -Potassium Permanganate Protective Clothing 6 Sets -Coveralls -Hood -Shoe Covers -Surgeon Gloves & Masks -Plastic Bags Attachment C Page 1 of 2 PROCEDURE NUMBER REVISION NUMBER 'AGE NUMBER 13.14.4 9 13.14.4-51 of 91 Wp 59B Rl (9.al) ~ 1 44 CQHTIRQLLED CQPY INSTRUCTIONS HOSPITAL RAOIOLOGICAL EMERGENCY KIT Locations:' Kit 1HK Kadlec Hospital Emergency Room Storage Cabinet o , Kit 2HK Kennewick Hospital Emergency Room Storage Closet o Kit 3HK Our Lady of Lourdes Hospital Decon Shower Room I o Kit 4HK- Yakima Valley Memorial Hospital Autopsy Room ~uarter1 (and after uae): o Inventory contents o Check physical condition of contents and replace items as needed. o Verify portable instrument calibration and TLO dates will not be exceeded prior to quarterly check: o Verify that all procedures and action cards are the current revision. Attachment C Page 2 of 2 PROCEOURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-52 of 91 WP 598 A1 (9 KI) P pl t > d tQ"

  • II =-

CQIMTIRQlLEOI CQP'It'MERGENCY PLANNER COMMUNICATIONS SYSTEM TEST ~hnnthl o Perform test (by two-way communication) of the fo lowing 1 dedicated telephone lines: o State of Washington Emergency, Operations Center (Olympia) o DOE o County o Nuclear Regulatory Commission Headquarters (phone located in the Control Room, TSC, EOF, NRC Room and MUDAC). ~Annnn11 o Verify accuracy of Emergency Telephone Directory. Revise and reissue as needed. Attachment D Page 1 of 1 PROCEDURE NUMBER REVISION NUMBER 'AGE NUMBER 13.14.4 9 13.14.4-53 of 91 WP.59$ Rl (9 LI) ')t Iran> !)( 0 ~5 COMMUNICATIONS SYSTEM TESTS A, Facsimile Network Locations: o WNP-2 Control Room o WNP-2 Technical Support System o Emergency Operations Facility (EOF) Communications Center o EOF, Technical Data Center o Joint Information Center, (Supply System Multi-Purpose Facility) o Headquarters Communication Center, (Supply System Multi-Purpose Facility) o State of Washington Emergency Operations Center (Olympia) o County Emergency Operations Center, (Kennewick) o Department of Energy-Richland (DOE-RL) ~Month 1 o Perform operational check of the facsimile transmission network by two-way transmission: ~Month 1 o Document performance of weekly siren system status tests. ~uarterl o Perform siren system growl test. ~Annual 1 o Perform full operational test of siren system. Attachment. E Page 1 of 4 PRCCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13e14.4-54 of 91 WP 59B Rl (0 83) QI 'I 4 gl CQMTIRQLlLK)CQPY COMMUNICATIONS SYSTEM TESTS (Continued) C. Oedicated Tele hone S stems ~Month 1 o Test all lines of the following: o Emergency Response Crash System o Emergency Response Oial-up System o Emergency Response Ring-down System ~ua rter1 o Test all lines of the following: o Emergency Response Public Information Officer Network

0. Data Circuits

~Monthl o Check status of data circuits between Supply System facilities. E. EOF Public Address S stem ~Monthl o Perform operational check F. Field Team Radios M~onthl o Perform operational check on portable radios and batteries. ~Annua 1 1 o Check per FCC requirements G. Plant Emer enc Team E ui ment M~onthl o Replace batteries and perform operational checks on portable radios (OSC). Attachment E Page 2 of 4 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 13.14.4-55 of 91 t~, g

)(

V ' j(.QHTIRQlLLED CQPY COMMUNICATIONS SYSTEM TESTS (Continued) ~uarterl o Check portable (orange) telephones for operability (OSC) o Check SCBA skullbone transmitters for operability (OSC) H. Communication Consoles Locations: 1CC EOF Communications Center (2) 2CC WNP-2 Central Alarm Station (1) o 3CC - WNP-2 Secondary Ala'rm Station (1) 4CC - Headquarters Communications Center (1) ~Month 1 Perform operational check (by two-way transmission) on all channels I. ~Pa era ~uarterl o Perform quarterly activation test. J. Auto Dialer ~uarterl o Perform quarterly activation test. Attachment E Page 3 of 4 ~ PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-56 of 91 WP 59B Rl (Ih83) I + 4 6l~i l '+P ~ 3w COMMUNICATIONS SYSTEM TESTS (Continued) K. Radio Controllers Locations: 0 SDC1- Security Decision Center 0 MDA1 MUDAC 0 MDA2- MUDAC 0 TSC1 Technical Support Center 0 TSC2- Technical Support Center 0 RSD1 Remote Shutdown Room 0 OSC1 Operations Support Center/Alternate OSC ~Month 1 o Perform two-way transmission check on all channels. o 'erform operational check on EOFCC patching system. Attachment E Page 4 oF 4 PRCCEOURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 13.14.4-57 of 91 WP 598 R1 (9 88) f gl CQMRQILlEG CQPY EMERGENCY OPERATIONS FACILITY MEOICAL E UIPMENT AND SUPPLIES INSTRUCTIONS EOF FIRST AIO ROOM ~uarterl (aod after major use): o Verify oxygen bottle full o Check oxygen regulator o Inventory contents o Check physical condition of contents and replace items as necessary o Verify expiration/calibraton dates of equipment/supplies will not be exceeded prior to next quarterly audit-o Perform operational checks o Pen light Attachment F Page 1 of 3 PROCEDURE NUMBER REVISiON NUMBER PAGE NUMBER 13.14.4 9 13.14.4-58 of 91 WP 598 Rt (0 83) \ E ~ f CONTENTS EOF FIRST AID ROOM DESIRED ITEM gUANTITY Kling Bandages (Assorted) 2 boxes Telfa Pads (Sterile)(Assorted) 1 box Coban Wrap Bandages (Assorted) 1 box Knuckle Dressing 4 Bandaids (Assorted) 24 ABD Dressings (Trauma) 10 Triangular Bandages 10 Tape, Paper (Adhesive)('Assorted) 6 rol 1 s Eye Pads (Dressings) 10 Pads (Bulk)(Assorted) 2 packages Scrub Brush (Soft) 4 ,Cotton Applicators 1 box Alcohol Wipes 2 boxes Burn Sheets (Sterile) 2 Surgical Gloves 12 pair Anticeptic Scrub 2 bottles+ Bacitracin 2 tubes+ Instant Glucose 3 tubes+ Oxygen and Oxygen Equipment: Portable "0" Bottle with Regulator 1 Face Masks 6 Eye Irrigation Dacriose Solution 3+ Pen Light and Spare Batteries 3 Bandage Scissors (5-1/2") 1 Stretcher (Gurney) with Casters 1 Pad (Stretcher)(3" Foam) 1 Back Board 1 Blood Pressure Cuff 1 Stethoscope 1 Extraction Scissors 1 + Indicates item has shelf life expiration date Attachment F Page 2 of 3 PROCEOURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 1 3. 14. 4-59 o f 91 wP.598 R1 I9 83) goal pkp j 4 CONTENTS EOF FIRST AI0 ROOM (Continued) OESIREO ITEN gUANTITY Blankets 4 Sheets 4 'Pillows 2 Pillow Cases 4 Clam Shell Stretcher 1 Splints (Cardboard)(Assorted) 2 sets Splint, Air, Assorted 6 Oisaster Tags 20 Patient Treatment Record Forms 20 NOTE: The following supplies are to be used only by qualified personnel. Ring Cutter 1 Tweezers (small and medium) 1 each Splinter Forceps 1 Bulb Syringe 1 Attachment F Page 3 of 3 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-60 of 91 WP 598 81 (9 aI) e ~ i g~yg ~ ls

  • 4

EMERGENCY CENTER E UIPMENT AND SUPPLIES G-1 Instructions Emergency Centers G-2 Control Room Inventory List G-3 Technical Support Center Inventory List G-4 Operations Support Center Inventory List G-5 Supply System Decision Center Inventory List G-6 Security Decision Center Inventory List G-7 EOF Communications Center Inventory List G-8 Hg Communications Center Inventory List G-9 Offsite Agency Coordination Center Inventory List G-10 Technical Data Center Inventory List G-11 MUDAC Inventory List G-12 Media Briefing Preparation Area Inventory List G-13 EOF Records Room Inventory List G-14 NRC Work Area Inventory List G-15 Crisis Management Center Inventory List G-16 Joint Information Center Inventory List Attachment Section G Page 1 of 1 PROCEDURE NUMBER REVISIGN NUMBER PAGE NUMBER 13.14.4 9 13.14.4-61 of 91 WP 598 R1 (9.83) 4+'I 4g t,(" 4 CQMTIRQllLFO CQPV INSTRUCTIONS EMERGENCY CENTERS ~uarterl o Inventory o Check physical conditions of center contents o Verify all procedures/documents are the current revision and have not been written on. o Verify potassium iodide (if present) will not exceed expiration date prior to next quarterly check. o Perform operational checks on center contents as appropriate to insure all listed equipment is functional. o Arrange replacement of missing items as necessary. Attachment G-1 Page 1 of 1 PROCEDURE NUMBER REVISIGN NUMBER PAGE NUMBER 13.14.4 9 13.14.4-62 of 91 WP.598 Rl (9 KI) l 1 II E I'~ a l CQHTIRQULEG tL."QPV CONTROL ROOM INVENTORY LIST Quantity Item ~Re aired . Oesirable On-Hand GDS Terminal TRS-BO, Model 100 Cassette Deck Emergency Plan Emergency Plan Implementing Procedures Emergency Organization Telephone Directory NEFAX manual 1 NEFAX Paper (Spare) 1 Roll FNF Notification Forms 1 Pkg After Action Report Forms 1 Pkg Emergency Response Log 1 Pad Potassium Iodide 7 Bottles Facsimile Attachment G-2 Page 1 of 1 PROCEDURE NUMBER REVIS/ON NUMBER PAGE NUMBER 13,14.4 9 13.14.4-63 of 91 WP 598Rl (983) l Al jI ((a ll ~~~ gV. g CQHTIRQlLILEG jl:QPV TECHNICAL SUPPORT CENTER INVENTORY LIST quantity Item Receuired Desirable On-Hand GDS Terminal 2 Printer/Plotter Device Standard CRT Display Terminal TRS-BO, Model 100 Schematic Printer WNP-l, 2 Emergency Preparedness Plan Emergency Plan Implementing Procedures Emergency Organization Telephone Directory WNP-2 Shielding Evaluation Report General Arrangment Plans/Flow Diagrams 1 Set Master Equipment. List WNP-2 Technical Specifications WNP-2 Plant Operating Procedures (All) WNP-2 Final Safety Analysis Report As-Built Drawings 1 Set Aperture Card Reader/Printer WNP-2 Emergency Operating Procedures (Vol. 5) WNP-2 Operations Records (reel film copy available in Service Building) 1 Set Plant Operations (Safety) Committee Records and Reports (available in Service Building) 1 Set EDPS User's Manual NEFAX Operator's Manual 1 NEFAX Paper (Spare) 1 Roll Overhead Projector Bulb (Spare) 1 FNF Notification Forms 1 Pkg After Action Report Forms 1 Pkg Emergency Response Log 1 Pad Portable Emergency Lights 8 Sets Duplicating Machine (available nearby) Duplicating Paper 2 Boxes Attachment G-3 Page 1 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13,14.4 9. 13.14.4-64 of 91 WP SSS Rl (9 kI) ( 1 fi( h ( <I ' TECHNICAL SUPPORT CENTER INVENTORY LIST (Continued) guantity Item ~Re uired Desirable On-Hand Significant Event Log Transparencies Staff Manning Chart Emergency Classification Status Board Ten-Mile Emergency Planning Zone Hap Fifty-Mile Emergency Planning Zone Map 200'ecision Washington State Road Atlas Plant Status Board Making Logic Protective Action Recommendation Flow Charts Set WNP-2 Emergency Procedure Poster WNP-2 Si'te Map Clock (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> display) Overhead Projector Projection Screen Cassette Recorder Potassium Iodide Bottle Various Operation and Maintenance Manuals as per Technical Staff, Manual Log in TSC Set ASHE Section III (available in GSB Library) Regulatory Guides Set 10 CFR Set of Systems and Procedures Training Manuals Set Environmental Equipment gualification Report (SR) Document Control System List (DCS) Fuse List SITS/FITS Complete Set of Diazo Cards (AE/CVI) Set Set of ALARA Diazo Cards Set Top Tier List Set of A.E. Top Tier Drawings Set Set of G.E. Top Tier Drawings Set Set of G,E. Most Wanted Drawings Set Attachment G-3 Page 2 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 ~ 13.14.4-65 of 91 WP 598 Rl (9 NI tc.r~' f OPERATIONS SUPPORT CENTER INVENTORY LIST guantity Item Receuired Oeairable On-Hand WNP-l, 2 Emergency Preparedness Plan Emergency Plan Implementing Procedures Emergency Organization Telephone Directory WNP-2 Shielding Evaluation Report General Arrangement Plans/Flow Diagrams 1 Set Master Equipment List OSC Activation Cards 1 Set Plant Status Maps 1 Set 'Staff Manning Chart Emergency Classification Status Board Plant Status Board OSC Team Location Status Board Plant Hazardous Areas Status Board WNP-2 Emergency Procedure Poster WNP-2 Site Map 1 Clock (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> display) 1 Overhead Projector 1 Projection Screen 1 Overhead "Projector Bulb (Spare) 1 15 Minute Time Clock 1 After Action Report Forms 1 Pkg Emergency Response Log 1 Pad Significant Event Log Transparencies 200 Radio Base Station Radio - Portable SCBA Skul lbone Transmitters HP List of Respiratory Equipment Work Restrictions 1 Set Complete Set of EWD Drawings 1 Set Attachment G-4 Pag.e 1 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-66 of 91 WP.598 Al (9 83) k, "I~ 'zc$ S$ p <<~F ALTERNATE LOCATION-OPERATIONS SUPPORT CENTER INVENTORY LIST Quantity Item ~Re aired Oesirable On-Hand Set of A.E. Top Tier Orawings 1 Set Battery - Powered Razor Staff Manning Chart Emergency Classification Status Board Plant Status Board OSC Team Location Status Board Plant Hazardous Area Status Board WNP-2 Emergency Procedure Poster

  • 'Pl'ant'Hazardous Area Status Board Attachment G-4 Page 2 of 2 PROCEDURE NUMBER REVISION NUMSER PAGE NUMSER 13.14.4 9 13.14.4-67 of 91 WP 59$ RI (9 N)

a qbj,4@( 'I v' SUPPLY SYSTEM DECISION CENTER INVENTORY LIST Quantity Item ~Re aired Desirable On-Hand WNP-l, 2 Emergency Preparedness Plan-Emergency Plan Implementing Procedures Emergency Organization Telephone Directory INPO Emergency Resourses Directory 1 NRC Telephone Directory 1 Washington State Road Atlas 1 Staff Manning Chart 1 Emergency Classification Status Board 1 Ten-Mile'Emergency Planning Zone Board 1 Significant Events Status Board 1 Plume EPZ PAR/PAD Status Board 1 Plant Status Board 1 Protective Action Recommendation Flow Charts 1 .Set Owner Controlled Area Emergency Procedure Chart 1 Evacuation Route, Barricade, and Assistance Center Map Whiteboard WNP-2 Cutaway Poster Easel (Butcher Paper) Offsite Agency Representative Manning Chart Clock (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> display) Individual Postion Signs 16 Cork Board Clipboard In/out Baskets 1 Set FNF Notification Forms 1 Pkg After Action Report Forms 1 Pkg Emergency Response Log 1 Pad t PROCEDURE NUMBER WP 598 Rl (983) 13.14.4 REVISION NUMBER 9 Attachment G-5 Page 1 of PAGE NUMBER 1 13.14.4-68 of 91 h i;.~ +<'cj)' SECURITY DECISION CENTER INVENTORY LIST Quantity Item ~Re aired. Oesirable On-Hand WNP-l, 2 Emergency Preparedness Plan Emergency Plan Implementing Procedures Emergency Organization Telephone Directory Benton/Franklin County Emergency Plan Staff Manning Chart Emergency Classification Status Board Ten-Mile Emergency Planning Zone Board Fifty-Mile Emergency Planning Zone Map Significant'Events Status Board Evacuation Route, Barricade, and Assistance Center Map Whiteboard Clock (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> display) Cork Board Clipboard In/Out Baskets 1 Set After Action Report Forms 1 Pkg Emergency Response Log 1 Pad Attachment G-6 Page 1 of 1 PROCEDURE NUMBER REVIStON NUMBER PAGE NUMBER 13.14.4 9 13.14.4-69 of 91 S I >I' EOF COMMUNICATIONS CENTER INVENTORY LIST guantity Item Re<euired Oeeirable On-Hand Emergency Plan Implementing Procedures Emergency Organization Telephone Directory Staff Manning Chart Cork Board Fire Alarm Location Map FCC License Display Map of EOF/PSF Clipboard In/Out Baskets 1 Set Message Board (outside center) 1 NAWAS Warning Point Information Sheet Duplicating Machine (outside center) Duplicating Paper 2 Boxes NEFAX Paper (Spare) 1 Roll FNF Notification Forms 1 Pkg After Action Report Forms 1 Pkg Emergency Response Log 1 Pad Communication's Runner's Folders 1 Set Attachment G-7 Page 1 of 1 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-70 of 91 WP SQS AI (983) I ll * %l Kl ~ \ ~, -~", +if l' I l l I'it 4 ~ 4 C - I /fl~ HEADQUARTERS COMMUNICATIONS CENTER INVENTORY LIST Quantity Item ~Re uired Oesirable On-Hand Staf f Manning Chart 1 Cork Board 1 FCC License Oisplay 1 Clipboard 1 In/Out Basket 1 NAWAS Warning Point Information Sheet 1 Nefax Paper-(Spare) 1 FNF Notification Forms 1 Pkg After Action Report Forms .1 Pkg Emergency Response Log 1 Pad Map of Multi-Purpose Facility, Hain Building, Warehouse Facsimile Attachment G-B Page 1 of 1 PROCEDURE NUM8ER REVISION NUM8ER PAGE NUM8ER 13.14.4 9 13e14.4-71 of 91 WIa 598 Rl (983I I~ I t '~ ",p >+fg$ 'l1 Sgi ll,/kg 'Cl'8 4 'I ' ' P e 4 'I ~ H OFFSITE AGENCY COOROINATION CENTER INVENTORY LIST guantity Item ~Re aired Oeairable On-Hand WNP-1, 2 Emergency Preparedness Plan Emergency Plan Implementing Procedures Benton/Franklin County Emergency Plan Washington State Emergency Plan 1 After Action Report Forms 1 Pkg Emergency Response Log 1 Pad Center Manning Chart Emergency Classification Status Board Ten-Mile"'Emergency Planning Zone Map Significant Events Status Board Evacuation Route, Barricade, and Assistance Center Map Whiteboard 1 WNP-2 Cutaway Poster 1 Clock (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> display) 1 Individual Position Signs 1 Cork Board 2 Clipboard 3 In/Out Baskets 1 EBS Radio 1 Benton and Franklin Counties FNF Emergency 1 Pkg Broadcast Message Forms

  • Attachment G-9 Page 1 of 1 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-72. of 91 WP.598 Ri (9 83)

1 ~ ) i'>" C. .4 ~*y= ~ ., q "~< ~" ic;w>" ~'I ~ % TECHNICAL OATA CENTER INVENTORY LIST Quantity Item ~Re aired desirable On-Hand GOS Terminal Standard CRT Oisplay Terminals Printer/Plotter Device NNP-1, 2 Emergency Preparedness Plan Emergency Plan Implementing Procedures Emergency Organization Telephone Oirectory NEFAX Operator's Hanual POIS Design Specifications 1 NEFAX Paper (Spare) 1 Roll Four Connection Hultiple Outlet Overhead Projector T-Square 1 After Action Report Forms 1 Pkg Emergency Response Log 1 Pad Staff Hanning Chart Emergency Classification Status Board Significant Events Status Board 1 Plant Status Board 1 Protective Action Recommendation Flow Charts 1 Set Nhite Board 5 Clock (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> display) 1 Cork Board 1 Tray of 35 mm Slides 1 Clipboard 3 In/Out Baskets 1 Attachment G-10 Page 1 of 1 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13e14.4-73 of 91 wP.59$ Rl (9 83) "4 METEOROLOGY AND UNIFIED DOSE ASSESSMENT CENTER INVENTORY LIST Quantity Item ~Re aired Desirable On-Hand GDS Terminal Standard CRT Display Terminal Tektronix Terminal and Color Printer Printer/Plotter Device TRS-BO, Model 100 ( In Cabinet) Computer Cassette Recorder ( In Cabinet) Program Casette Data tape ( In Cabinet) Electrical Supply Unit for TRS-80 ( In Cabinet) IBH-PS/2 Laser Printer Epson Printer Computer Terminal Modem HP 7470A Plotter . Potassium Iodide 50 Bottles WNP-l, 2 Emergency Preparedness Plan Emergency Plan Implementing Procedures Emergency Organization Telephone Directory Evacuation Time Study EDPS User's Manual Field Team Map Kits Emergency Planning Zone Map Book (50-Mile EPZ) Manual Emergency Dose Calculation Manual State DSHS Procedure Volume Aerial Photo Hap Book (10-mile EPZ) Tri-Cities Map Washington State Road Atlas WINCO-1009 WINCO-1012 Flip Chart with Easel Attachment G-ll Page 1 of 2 PROCEOURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14 4-74 of ~ 91 WP 598 II1 (9.83) IC~ g A ig V METEOROLOGY AND UNIFIED DOSE ASSESSMENT CENTER INVENTORY LIST (Continued) guantity Item ~Re aired Desirable On-Hand Staff Hanning Chart Emergency Classification Status Board Ten-Hi le Emergency Planning Zone Hap Protective Action Recommendation Flow Charts 1 Set Evacuation Route, Barricade, and Assistance Center Map Plume EPZ PAR/PAD Status Board HNP-2 Cutaway Poster Aerial Monitoring Hap Aerial Photograph Hosaic Meteorological and Plume Data Status Board Clock (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> display) Clipboards (Cabinet) In/Out Baskets (Cabinet) 1 Set After Action Report Forms (Cabinet) 25 Emergency Response Log (Cabinet) 25 Radio Console with Microphone (HDA I and HDA II) Radio Console (Meather Station Monitor) 3 Radio Console (Ai rc ra ft Ground Control) Radio Dispatcher Headset (Cabinet) (with push to talk clip on adaptors) Telephone dispatcher Headset (Cabinet) (with push to talk clip on adaptors) Attachment G-ll Page 2 of 2 PROCEDURE NUMBER REVISlON NUMBER PAGE NUMBER 13.14.4 9 13.14.4-75 of 91 WP 598 R1 (9 83) MEDIA BRIEFING ANO PREPARATION AREA INVENTORY LIST quantity Item ~Re aired Oesirahle On-Hand NNP-l, 2 Emergency Preparedness Plan Emergency Plan Implementing Procedures Emergency Organization Telephone Directory Cliboard 3 In/Out Baskets 1 After Action Report Forms 1 Pkg Emergency Response Log 1 Pad Attachment G-12 Page 1 of 1 PROCEDURE NUMBER REVlSION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-76 of 91 V(P 598 A1 (8 88) 'k Ql , h E EOF RECORDS ROOM INVENTORY LIST guantity Item ~Re uired Desirable On-Hand WNP-2 Shielding Evaluation Report General Arrangement Plan/Flow Diagram +Master Equipment List WNP-2 Technical Specifications WNP-2 Plant Operating Procedures 1 Set WNP-2 Final Safety Analysis Report 1 Set +WNP-2 As-Built Drawings 1 Set Microfilm Roll Reader/Printer 'perture Card .Reader/Printer WNP-2 Emergency Operating Procedures 1 Set Word Processing Station +lluuarterll Ensure that document contains the most recent published revision. Attachment G-13 Page 1 of 1 PROCEDURE NUMBER REVISlON NUMBER PAGE NUMBER 13.14.4 9 13.14.4-77 of 91 WP 59SR1(9 ai) f Wl j% y I CQMIRQU.ED CQPY NRC WORK AREA INVENTORY LIST Quantity Item ~Re uired Oeeirable On-Hand WNP-l, 2 Emergency Preparedness Plan Emergency Plan Implementing Procedures Emergency Organization Telephone Oirectory White Board Cork Board Clock (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> display) Cl i pboards In/Out Baskets 1 Set Attachment G-14 Page 1 of 1 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-78 of 91 WP 5SB Rl (983) 4 4'g CW lt AP "$t l w 'I ,r e t."QNTRQLLED CQPY CRISIS MANAGEMENT CENTER INVENTORY LIST Quantity Item ~Rs aired Oesirable Qn-Hand WNP-l, 2 Emergency Preparedness Plan Emergency Plan Implementing Procedures Emergency Organization Telephone Oirectory Drawings ( f rom FSAR) 1 Set Staff Manning Chart 1 Emergency Classification Status Board 1 Ten-Hi le Emergency Planning Zone Hap 1 Fifty-Mile Emergency Planning. Zone Hap 1' S'ignificant Events. Status Board Plant Status Board 1 Protective Action Recommendation Flow Chart 1 Owner Control led Area Emergency Procedure Poster 1 Evacuation Route, Barricade, and Assistance Center Map White Board WNP-2 Cutaway Poster Emergency Organization Chart Washington State Hap Safeguards and Contingency Chart Clock (24 hour display) Exclusion Area Map 1 After Action Report Forms 1 Pkg Emergency Response Log 1 Pad Attachment G-15 Page 1 of 1 PROCEOURENUMBER. REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-79 of 91 WP 59B Rl (983) 4 CQNTRQLl.ED CQPY JOINT INFORMATION CENTER INVENTORY LIST guankity Item Receuired Oesirable On-Hand NNP-l, 2 Emergency Preparedness Plan Emergency Plan Implementing Procedures Nord Processor Nork Stations 2 2, Emergency Organization Telephone Oirectory 2 Media Information Packages 15 25 Emergency Slides 1 Set Clock (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> display) Emergency Classification Status Board TV Honitor, EBS Radio Radio Actuality Machine 90 Hinute Tapes Ten-Mile Emergency Planning Zone Hap Staffing Roster Media Contact List 1 After Action Report Forms 1 Pkg Emergency Response Log 1 Pad Attachment G-16 Page 1 of 1 PROCEDURE NUMBER REVISlON NUMBER PAGE NUMBER 13.14,4 9 13. 1 4. 4-80 o f 91 ip "+9 P CQNTIRQLLED CQPY SIGN-IN SHEET Oate Time Team Number TEAM MEMBERS Print Sicinature Or anization DISCREPANCIES FOUND: Attachment H PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-81 of 91 WP.598 Al (0 N) CQNTRQLLED CQPY SIGN-OUT SHEET Oate Time Team Number. TEAM MEMBERS Print S~i nature Or anization OISCREPANCIES FOUNO: Attachment I PROCEDURE NUMBER REVISlCN NUMBER PAGE NUMBER 13.14.4 9 13e14.4-82 Of 91 WP 598 A$ (9 83) fp ~'l ~ CQNmQLLED CQPY OFF-SITE EMERGENCY SIGNS J-1 Instructions 3-2 Sign Locations 3-3 Sign Locations - Detailed Descriptions Attachment Section J PROCEDURE NUMBEFI REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-83 of 91 WP.598 II I I9 aI) CQNIQLLED CQPY INSTRUCTIONS OFF-SITE EMERGENCY SIGNS ~Annua11 o Check physical condition of signs. o Arrange repair and replacement of signs as necessary. Attachment J-1 Page 1 of 1 . PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-84 of 91 WP 598 R1 (9 S3) r ~l ih '\ tg SIGN LOCATIONS ~aaatit Number Location Restricted Area 1 ¹1) WNP-2 Access Road 2 ¹2) FFTF Railroad Access 1 ¹3) DOE Railroad Access (from South) 1 ¹4) WNP-1/4 Access Road 1 ¹5) 115 Kv Line (from South) 1 ¹6) Pump House Access Road 2 ¹7) Ashe Substation Road ¹8) (Not used) ¹9) DOE Railroad Access (from North) ¹10) WNP-2 Access Road 1 ¹11) Telephone Cable Road 12 Exclusion Area ¹1) WNP-2 Access Road ¹2) FFTF Railroad Access ¹3) DOE Railroad Access (from South East) ¹4) WNP-1/4 Access Road to WNP-2 ¹5) WNP-1/4 Access Road at Junction of Access Road to WNP-2 ¹6) DOE Railroad (to WNP-1/4) ~ ¹7) WNP-1/4 Access Road to WNP-1 ¹8) Pump House Access Road ¹9) 500 Kv Line (from River to Ashe) ¹10) Power Lines (from Northwest to Ashe) ¹11) DOE Railroad (from Northwest) ¹12) Power LInes (from Southwest to Ashe) ¹13) Entry to Parking Lot for WNP-1 ¹14) Construction Road along North Fence of WNP-4 ¹15) Road East of DOE Railroad 1 ¹16) Road West of DOE Railroad 17 Attachment J-2 Page 1 of 3 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 13.14.4-85 of 91 WP 599 II1 I9 99) tg Jj I J SIGN LOCATIONS (Continued) ~uantit Number Location Emergency Siren Infor- 1 ¹1) Selph Landing mation ¹2) WNP-2 River Pump House ¹3) North of WNP-2 River Pump House ¹4) Ringold Hatchery ¹5) Leslie Groves Park ¹6) Selph Landing Boat Ramp Access Caution ¹1) Plant Support Facility - Parking Lot Access Road ¹2) Meteorological Tower - on Building ¹3) GTE Microwave Building on Fence ¹4) Gate 23 Bechtel Badging Trailer ¹5) Gate 23 Vehicle Construction Area Gate ¹6) Gate 23 Pedestrian Construction Area Gate ¹7) Gate 23 - in Parking Lot Near Large Signs on Access Road ¹B) (Not Used) ¹9) (Not Used) ¹10) BPA Ashe Substation in Front of Smaller of Three Buildings ¹11) PAP - at Stop Sign at Railroad Crossing ¹12) Building 89 - Next to "Chalet" ¹13) Gate 25 - at Entrance to Warehouse Complex ¹14) (Not Used) ¹15) Visitor's Center on South Side ¹16) WNP-2 Lower Parking Lot at Steps to Upper Level Near Tracks ¹17) 8Y" Siren - on Pole Attachment J-2 Page 2 of 3 PROCEDURE NUMBER REVIS(CN NUMBER PAGE NUMBER 13.14.4 9 13.14.4-B6 of 91 WP.Sre8 Rl (8 83) 3' SIGN LOCATIONS (Continued) ~uantit Number Location gl8) Sewage Treatment Plant on North Side of Building 1 419) WNP-1 - on Main Vehicle Gate 1 f20) WNP-1 on Fence Next to Pedestrian Gate 1 f21) (Not Used) 1 g22) (Not Used) 1 f23) WNP-4 on Hain Vehicle Gate 1 g24) WNP-4 on Fence Next to Pedestrian Gate 1 Ã5) Firing Range on South Side of Building 86 Attachment J-2 Page 3 of 3 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-87 of 91 WP.598 Bl (9 83) > C CQNTIRQI.LEG CQPY SIGN LOCATIONS-DETAILED DESCRIPTIONS Restricted Area gl) WNP-2 Access Road - Approximately '30 feet West of small sign indicating PSF, approximately 200-300 feet West of PSF access road. g2) FFTF Railroad Access (2 signs) FFTF Railroad Access Road 0.4 miles from sewage treatment access road at railroad siding and buried phone cable. g3) DOE Railroad Access, (from South) - Where railroad tracks cross access road to the sewage plant. g4) WNP-1/4 Access Road On road, East side, across from access road to the sewage plant. g5) 115 kV Line (from South) On access road to sewage plant adjacent to the substation. "46) Pump 'House Access Road - East of intersection approximately 100-500 feet; adjacent to last post (Hest) on parking lot fence on North side of road. g7) Ashe Substation Road (2 signs) (1) At intersection with Unit 2 access road. (2) On dirt road that meets substation road at Unit 2 access road, approximately 20-30 feet East of intersection.

48) Not used.

g9) DOE Railroad Access (from North) At WNP-2 access road crossing on South side of road. glO) WNP-2 Access Road On West side of access road just South of turn in road which is just East of railroad track crossing. gll) Telephone Cable Road - On Hest side of road just South of road going off to West to parallel power lines; adjacent to old telephone pole ~ (See note bottom of page 2.) Exclusion Area gl) WNP-2 Access Road Just West of bend in road, West of PSF on South side, of road.

42) FFTF Railroad Access (3 signs) (1) On road on North side of tracks approximately 0.4 mile from Route 4, just East of bend in tracks. (2) On South side of tracks adjacent to sign (1) - (3) On road on South side of tracks adjacent to sign (2).

Attachment J-3 Page 1 of 2 PROCEDURE NUMBER REVIS lON NUMBER PAGE NUMBER 13.14.4 9 13.14.4-88 of 91 WP 59$ Rl (983} QP 1i qL SIGN LOCATIONS-DETAILED DESCRIPTIONS (Continued)

43) DOE Railroad Access (from Southeast) On East side of tracks adjacent to sign 44 below.

g4) WNP-1/4 Access Road to WNP-2 Under second set of traffic signs across highway, North of intersection.

45) North of WNP-1/4 Access Road, across from "WNP-1 Preparing for the Future" sign, 20 yards into desert.

g6) DOE Railroad (to WNP-4) - On fence where tracks enter WNP-4 fenced area-next to gate. g7) WNP-1/4 Access Road to WNP-1 On road. just North of intersection with road that runs East-West along WNP-1 fence.

48) Pump House Access Road At gate on East side of Unit 1 fence where roads passes through fenced area of WNP-1/4, approximtely 6 feet East of fence.
49) 500 kV line (from River to Ashe) - At third single tower after line turns East from Ashe. Small red sign on towe reads "ACF 188".

410) Power Lines (from Northwest to Ashe) - Just South of environmental sample road crossing. Sample road runs East of railroad corssing mentioned in sign gs 11, 15 and 16 below. gll) DOE Railroad (from Northwest) - On West side of tracks just North of road crossing, gl2) Power Lines (from Southwest to Ashe) Adjacent to the fourth set of towers West of the telephone cable road. (See note at bottom of page.) gl3) Entry to Parking Lot for WNP-1 At entry to WNP-1 parking lot which is just East of railroad access in sign 46 above. gl4) Construction Road along North Fence of WNP-4 At access gate due North of Unit containment; near stored polar crane; sign on North side of road and facing East. f15) Road East of DOE Railroad - On road just North of railroad crossing. gl6) Road West of DOE Railroad On road just South of railroad crossing. NOTE: The telephone cable road is the dirt/gravel road intersecting the WNP-2 access road about 150-200 feet North of the North fence line of Wye Burial Ground. Attachment J-3 Page 2 of 2 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-89 of 91 wP 598 Rl (983) Jdi 4 h A% VENTILATION RAOIATION MONITORING HVAC Location: o Emergency Operations Facility (EOF) ~earterl o Perform radiological check of HVAC in accordance with RPI 7.45 with assistance from Facilities personnel for verification. o Oocument this check by signing the tickler card and the data sheet, File 963.5.2.2, in the possession of Radiological Programs. Attachment K PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.4 9 13.14.4-90 of 91 WP 898 Al (9.88) pig v,q~r$ 'l k~%, lag FACILITIES SYSTEMS TESTS A. HVAC Location: Emergency Operations Facility (EOF) ~ear ter1 Perform electrical check of HVAC in accordance with manufacturers speci fications. Verify radiological check with assistance from Radiological Program personnel. Document this check by signing the Data Sheet in possession of Rad. Services. B. 'Diesel'Generators Locations: o Headquarters (Hg) o Emergency Operations Facility (EOF) N~oethl o Perform load test of diesel generators in accordance with manu facturers spec i f i cati ons. ~uarterl o Verify operation of transfer switch in accordance with manufacturers specifications. Attachment L PROCEOURE NUMBER REVISIGN NUMBER PAGE NUMBER 13.14.4 9 13.14.4-91 of 91 144\HI'luell'i tl ~ I II tIIW 4 ~ SUPPLY SYSTEM PLANT PROCEDURES MANUAL WNP-2 PROCEDURE NUMBER APP ROY DATE 13.14.9 VOLUME NAME 13 EM RG NCY PL N I T SECTION 13.14 SUPPORTING INFORMATION PROCEOURES TITLE 13.14.9 EMERGENCY PROGRAM MAINTENANCE 13.14.9.1 ~Pur oee This procedure identifies the activities necessary on an on-going basis to maintain a current emergency preparedness program. This procedure is an overview reference and should not be utilized as a substitute for the detailed requirements contained in the referenced documents. 13.14.9.2 References A. PPH 1.2 Series, Plant Administrative Procedures B. EPIP 13.14.4, Emergency Equipment C. EPIP 13.14.S, Emergency Organization O. EPIP 13.14.7, Emergency Training EPIP 13.14.8, Ori lls/Exercises F. 10CFRSO, Appendix E,Section IV, F REVISION NUMBER PAGE NUMBER 13.14.9 13.14 9-1 of ~ 7 WP 597 R3 (2/88) P 13.14.9.3 Procedure Res onsibi lit Action Manager, Emergency .1. Coordinate, as appropriate, with the WNP-2 Planning Health Physics/Chemistry Manager, and Emergency Center Directors, to implement . the requirements oF Attachment A, Topics Requiring Periodic Review or Action.

2. Notify the Manager, Health Physics/

Chemistry of any condition which would preclude or interfer with the ability of the Supply System to respond to emergency conditions. Manager, Health Physics/ 3. Coordinate, as appropriate, with the Mana-Chemistry and Emergency ger, Emergency Planning to implement the Center Directors requirements of Attachment A, Topics Requir-ing Periodic Review or Action.

4. Notify the Manager, Emergency Planning of any condition which would preclude or interfere with the ability oF the Supply System to respond to emergency conditions.

13.14.9.4 Attachments A. Topics Requiring Periodic Review or Action PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.9 13.14.9-2 of 7 WP 59B R1 (9 83) g i': rr. g I ~ CQNIQLLED CQPY TOPICS RE UIRING PERIODIC REVIEW OR ACTION To ic Res onsibilit ~Fee uenc Sco e

1. WNP-l, 2 Emergency Nanager, Emergency Annual Utilize guidance From PPN 1.4.5, to Preparedness Plan and WNP-2 Manager, (After the coordinate review, revision, approval, Review Kealth Physics/ Major exer- and issuance of the plan to incorporate Chemistry cise and changes resulting from new regulations, before the cri tiques of drills/exercises, audit next years findings, and corments From personnel/

ma agencies inside and outside the Supply Jol'xercise) System. Insure that the Washington State Department of Emergency management, the Benton/Franklin County Department of ~ Emergency Management, and the Department of Energy-Richland Operations are con-tacted early in the review/revision process and that their corrrnents are solicited. and considered for input into the process. Assure a 10CFR50.59 review is completed in accordance with PPN 1.4.5. Ensure the supporting documen-tation is submitted to POC consistent with the proposed change.

2. WNP-2 Emergency Plan Nanager, Emergency As Necessary Utilize guidance Fram the PPN 1.2 Series Implementing Planning and WNP-2 (at least to coordinate reviews, revisions, and Procedures Manager, Health once every deviations required by revisions to Physics/Chemistry two years For the Emergency Plan or other requirements each EPIP) such as Findings from drills/exercises and audits. Insure deviations are placed in all locations where they are likely to be used. Insure that revisions affecting ofFsite response are coordinated with the appropriate agencies.
3. WNP-2 Emergency Plan Manager, Emergency quarterly Review and document telephone numbers in Implementing Planning emergency procedures.

Procedures Telephone Numbers

4. Emergency Action Manager, Emergency Annually Insure officials Fram the State of Level Review Planning Washington, Benton and Franklin counties and DOE-RL are afforded the opportunity to review the EALs (EPIP 13. l. 1).

Attachment A Page 1 of 5 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.9 13.14.9-3 of 7 wP 598 Al I HQI I CQNIQLLED CQPY TOPICS RE UIRING PERIOOIC REVIEW OR ACTION (Continued) To ic Res onsibi lit ~Fee uenc Sco e

5. Agreement Letters Manager, Emergency Annually Coordinate review and revision (as neces-Planning sary) of Agreement Letters. Maintain File of current agreement letters for inclusion in next annual revision of the Emergency Plan. Insure involved agencies are contacted to request their input to this review process.
6. Emergency Organiza- Manager, Emergency guar terly l. Maintain in accordance with EPIP tion Assignment List Planning 13. 14.5 "Emergency Organization".

quarterly 2. Coordinate review, revision, (or after approval, and issuance of current substantial version. change) I 7., Emergency Training Manager, Emergency I)uarterly 1. Review status of Emergency Organiza-Planning (or more tion personnel training. Frequently as necessary) As applicable 2. Review and approve new/revised Emergency Training modules.

3. Insure revisions to EPIP's are circu-lated for review of out-of-plant Supply System Emergency Organization personnel per EPIP 13. 14.7 "Emergency Training".
8. Notification Manager, Emergency guar ter ly Review notifications Call-Trees to insure Call-Trees Planning they are current and correct.

Emergency Center I)uarterly Ensure that center call trees are updated Oirectors and current. Forward copy to Manager of FP and EW programs.

9. Emergency Equipment Manager, Emergency Monthly Review status of task performance and Supplies Planning required by EPIP 13. 14.4 "Emergency Equipment".

Attachment A Page 2 of 5 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.9-4 of 7 VIP 598 Rl (980) TOPICS RE UIRING PERIOOIC REVIEM OR ACTION (Continued) To ic Res onsibilit ~Fre uenc Sco e

10. Emergency Facilities Emergency Center Insure that all modifications to any of Oirectors the Supply System's Emergency Centers-are documented and approved by the Manager of Emergency Planning.

ll. Outy Rosters Nanager, Emergency Meekly Insure issuance of current duty rosters (for pager holders) Planning providing 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day availability of key Emergency Organization Personnel. Monthly Obtain and post in the MNP-2 Control Roan, the duty roster for HEHF duty physician.

12. Annual Audi t Manager, Emergency Annually Insure an annual audit, meeting MNP-2 Planning Technical Specification requirements, is conducted. The audit is to include the Emergency Plan and Imple-menting Procedures, training, readi-ness testing, equipment, and inter- .

faces with state and local governments. Annually Insure the repor t on the annual audit is submitted to the Oirector, Support Services for evaluation and resolu-tion of findings. As Necessary 3. Insure that corrective actions needed by the Supply System are tracked to completion. Annually 4. Insure the results of the review and recarmendations are forwarded to "appropriate corporate and plant managers and that the portions pertinent to interface with the state and counties are available to those jurisdictions. As Appropriate 5. Insure that the report and recom-mendations are retained for a minimum of five years. Attachment A Page 3 of 5 PROCEDURE NUMBEA REVISION NUMBEA PAGE NUMBEA 13;14.9 13.14.9-5 of 7 WP.59r 81 (9.83) N +A CQNIQLLED l."QPY TOPICS RE UIRING PERIODIC REVIEW OR ACTION (Continued) To ic Res 'nnsibilit ~Fre cene Sco e

13. Ori ll/Exercise Nanager, Emergency Annually 1. Prepare and issue a drill/exercise Program Planning program schedule in accordance with EPIP 13. 14.8 "Ori lls/Exercises".
2. Review/revise multi-year exercise program to insure compliance with Attachment A of EPIP 13. 14.8 "Drills/Exercises" and 10CFR50, Appendix E, Section IV F.

As Necessary 3. Insure that corrective action records are completed for each dl ill/exercise critique item requiring action by the Supply System.

4. Maintain record copies of drill/

exercise packages.

5. Maintain a running log of all drills and excerises conducted during the year.
6. Coordinate implementation of EPIP
13. 14.8 "Orills/Exercises" to ensure all requirements are met.

Monthly 7. Review status of all open corrective action records and aggressively pursue any delinquent responses.

14. Emergency Planning Manager, Emergency As Necessary Insure all Emergency Planners maintain Staff qualifications Planning their professional qualifications by periodic attendance of industry seminars and courses and through observation of and participation in emergency exercises conducted at other facilities.
15. Evacuation Time Manager, Emergency Annually Review and update as necessary.

Studies- Planning

16. Population Studies Nanager, Emergency Annually Review and update as .necessary.

Planning Attachment A Page 4 of 5 PROCEOURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.9 13.14.9-6 of 7 WP-598 Al (9 83) TOPICS RE UIRING PERIODIC REVISI OR ACTION (Continued) To ic Res onsibi lit ~Fre uenc Sco e

17. Nedia Briefing Nanager, Emergency Annual ly Insure annual media briefing is Planning conducted.

1B. Public Information Nanager, Emergency Annually Insure preparation and distribution of Planning public information occurs.

19. Supply System Nanager, Emergency quarterly Distribute this directory to holders Telephone Directory Planning of Emergency Telephone Directory For insertion into the appropriate section.
20. Emergency Telephone Nanager, Emergency Annually Review, revise as necessary and distrib-Directory Planning ute directory.
21. Early Naming Nanager, Emergency Annually Generate report to FENA on Siren System Systems Planning availability.

Perform a coverage survey of Emergency Broadcast System warning effectiveness For a portion oF the covered area. Rotate such that all areas are surveyed within a four year period. Annual ly Nail 9-volt batteries to site neighbors having FN emergency alert radios. Review radio list for neighbors with AN radios. Arrange for battery ',changeout if they have had For longer >than 3.5 years.

22. Emergency Classifi- Nanager, Emergency quarterly Review notification list at the EOF cation Notification Planning (and as Comnunications Center (EOFCC) to ensure List, EPIP 13.F 1 necessary) point of contact phone numbers are Attachment B current. Correct as necessary.

Attachment A Page 5 of 5 PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 13.14.9 13.14.9-7 of 7 WP 588 RI (983) t' 0 l '1 l 4 e ) r( II '