ACCELEIUiTI DOCUlVIENTDISTRJTION SYSTEM h
REGULATORY INFORMATION 'DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9406160115 DOC.DATE: 94/06/16 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear project. Unit 2. Washington public powe 05000397 R
AUTH.NAME AUTHOR AFFILIATION Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION I
~ gi'(/pp
SUBJECT:
Pages 9
a 10 to Rev 11 to PPM-13-15,inadvertently ommitted from original submittal.
DISTRIBUTION CODE:
A045D COPIES RECEIVED:LTR 0 ENCL r
SIZE: 5 TITLE: OR Submittal:
- Plans, Implement'g Procedures, C
NOTES RECIPIENT ID CODE/NAME PDIV-3 PD INTERNAL AEOD/DOA/IRB NUDOCS-ABSTRACT EXTERNAL: NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 RECIPIENT
,ID CODE/NAME CLIFFORD,J DRSS PEPB EG IL 01 NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 A
D R
D D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP VS TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DONT NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 8
ENCL 8
D
)
1 t
7 DISTRIBUTI N - V LUME 13 Control.
~oy 2
3 5
6 7
8 10 12 20 21 25 26 27 28 30 31 35 36 37 42 46 49 50 52 53 54 55 56 57 58 59 60 Location Control Room Shift Manager Licensed Training Simulator Technical Manager Operations Manager Maintenance Manager Engineering Mgmt. Support Chemistry Supervisor Health Physics Supervisor Project Manager, Bechtel Region IV, NRC Security Programs Manager Region IV, NRC EOF Records Room TSC Emergency Response NRC Resident Inspector Emergency Preparedness Program Mgr. of Emerg Plann Ec Environ Prog Maintenance Training HSBGFP Security Training/Evaluation Emergency Director Division of Emergency Management Division of Community Development Dept. Of Health Radiation Protection Federal Emergency Mgmt. Agency Emergency Preparedness Coordinator Benton County Dept of Emerg. Mgmt.
Security '(SAS)
Security (CAS)
Security Page1of2 M~ail Dro 927A 927A 1027 1034 PE27 9270 927S PE13 927A 927A 964D 1021 1020 927A 927N 1020 1020 184 981S 1021 927A 913 913 913 WASHINGTONPUBLIC POWER SUPPLY SYSTEM P.O. Box 968
~ 3000 George Washington Way
~ Richland, Washington 99352%968 Jl ar-
~ ~-A 9406160115 940616 PDR RDDDK 05000597 F
PDR 1
Control Xmz 63 64 66 68 69 73 74 75 78 80 82 83 86 C82'0 93 94 95 97 104 105 106 114 118 126 127-132 (6) 133 134-136 (3) 137-140 (4) 142 144 146 161 164 N/A N/A N/A N/A t
t DTSTRIBUTION-V LUME 13 Continued L~ocati n Emergency Training Radwaste Control Room Simulator Shift Manager Remote Shutdown Room (13.4.1)
EOF Communications Center (EOFCC)
Dept. of Health Radiation Protection Dept. of Health Radiation Protection Dept. of Health Radiation Protection Control Room STA Plant Records EOF Decision Center MUDAC Simulator STA document-ControLDesk, NRC Corporate Communications Health Physics Center Offsite Agency Center Security Decision Center Technical Data Center Emergency Preparedness Program NRC Emergency Response Emergency Preparedness Program EOF Decision Center Procedure Development Group Asst. Managing Director for Operations Licensed Training Emergency Planning MUDACField Team Kits (Sec. 9, 13.13.4, 13.14A)
MPF Field Team Kits (13.5.4, 13.7.5, Sec. 9, 13.13.4, and 13.14.4)
Hanford UDAC Work Control Group FEMA RX Liason Equipment Operator Training Oregon State Dept. of Energy Charlie Callahan (PIU' Summary of Changes Only)
Sandy Day (IOMOnly)
CNSRB (1 Info Copy, 1 Copy PRF & Safety Evaluation)
Judy Schnell (2 Copies Complete PPM with "Yes"
.'ate Questions Only)
Admin. File w/o M~ail Dr 1020 927A 1034 927A 1021 927A 927A 1020 1020 1034 325 1020 1020 1020 1020 1020 1020 1020 1020 909 1023 1027 1020 1020 325 927W 1022 1022 927A 927A 927A 927A Page 2 of 2
TYPI AL J INT INFORMATION ENTER JIC Office Area Arrangement ELE TRONIC PAGE LEFT BLANKINTENTIONALLY To View this Attachment See a Hard Copy of this PPM PROCEDURE NUMBER 13.12.15 REViSION.5 PAOE 9 of 10
L J
t,
4
~
~
TYPICALJ INT INFORMATIONCENTER JIC ARRANGEMENT ELECTRONIC PAGE LEFT BLANKINTENTIONALLY
\\
To View this Attachment See a Hard Copy
'fthis PPM PROCEDURE NUMBER 13.12.15 REVISlON.6 PAOE 10 of 10
~
~
S'