Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17284A9121999-10-13013 October 1999 Proposed Tech Specs 3.3.6.1,Table 3.3. 6.1-1, Primary Containment Isolation Instrumentation. ML17284A8761999-08-27027 August 1999 Replacement Page 9 of 9 to Attachment 4 of Procedure 13.10.6 ML17284A8491999-07-29029 July 1999 Proposed Tech Specs,Revising SR 3.5.2.2 Re Condensate Storage Tank Water Level ML17284A8421999-07-29029 July 1999 Proposed Tech Specs Revising SR of TS 3.8.4, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17284A8461999-07-29029 July 1999 Proposed Tech Specs,Revising Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & E.A. ML17284A8521999-07-29029 July 1999 Proposed Tech Specs 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17333A0021999-04-20020 April 1999 Proposed Tech Specs Section 3.4.11,replacing Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6341999-04-0707 April 1999 Proposed Tech Specs Modifying MCPR Safety Limits to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B5731999-03-0101 March 1999 ODCM for WNP-2 ML17292B4881998-12-17017 December 1998 Proposed Tech Specs SR 3.8.1.8,allowing Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML20198A7051998-11-30030 November 1998 Revs 8 Through 13 to TS Bases & Revs 12 Through 15 of Licensee Controlled Specs ML17284A7181998-08-0505 August 1998 Proposed Tech Specs SR 3.8.4.7,allowing Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7071998-07-17017 July 1998 Proposed Tech Specs Modifying SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc,Battery E-B1-2 ML17284A6431998-05-29029 May 1998 Revised Plant Procedure Sys for Site Wide Procedures, Replacing Pages Located in Manual W/Pages in Package ML17292B2831998-03-0909 March 1998 Proposed Tech Specs Establishing Interim SLMCPR for Siemens Power Corp ATRIUM-9X Fuel Applicable to Cycle 14 Only ML17292B2591998-01-31031 January 1998 Offsite Dose Calculation Manual. ML17292B1321997-12-0404 December 1997 Proposed Tech Specs Modifying Min Critical Power Ratio Safety Limits ML17292B0281997-08-14014 August 1997 Proposed Tech Specs Revising TS 5.5.6 by Adding Note That Would Extend Interval Requirement to Perform Full Stroke Exercise Testing of TIP-V-6 Until 1998 Refueling Outage ML17292A9691997-08-12012 August 1997 Proposed Tech Specs Supporting Request for Enforcement Discretion for Period of 45 Days from TS Action 3.6.1.3.A Required Actions to Isolate Purge Line & Verify Penetration Flow Path Isolated Every 31 Days ML17292A9421997-07-16016 July 1997 Proposed Tech Specs Adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 EFPYs ML17292A8901997-06-0606 June 1997 Revised Tech Spec Page 2.0-1 Modified to Indicate That SLMCPR for ATRIUM-9X Fuel Applies Only to Cycle 13 & Corresponding Bases Pages ML17292A8651997-05-20020 May 1997 Proposed Tech Specs,Requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A8301997-03-31031 March 1997 Wppss WNP-2 RPV Surveillance Matls Testing & Analysis. ML17292A7621997-03-24024 March 1997 Rev 5 to TS Bases. ML17292A7631997-03-24024 March 1997 Rev 7 to Licensee Controlled Specs. ML17292A7581997-03-22022 March 1997 Proposed Tech Specs Modifying Response Time Testing SR for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A7531997-03-20020 March 1997 Proposed Tech Specs Re Response Time Testing Requirements ML17292A6591997-01-14014 January 1997 Proposed Tech Specs Reflecting Compilation of TS Change Requests Submitted to NRC in Ltrs Dtd 951208,960709 & 1212 ML17292A6341996-12-12012 December 1996 Proposed Tech Specs Requesting Conversion Based Upon NUREG-1434,rev 1 ML17292A6161996-11-19019 November 1996 Rev 1 to WNP-2 IST Program Plan (Pumps & Valves) 2nd Interval (941213-041212). ML17292A5511996-10-15015 October 1996 Proposed Tech Specs Re Secondary Containment & SGTS to Reflect Revised Secondary Containment Drawdown & post- Accident Analyses Results ML17292A5411996-10-10010 October 1996 Proposed Tech Specs Requesting Addition of Section 2B(6) Re Storage of Byproduct,Source & Special Nuclear Materials ML17292A4501996-09-0606 September 1996 Proposed Tech Specs,Containing Corrections to Factual Statements & Proposed Info to Clarify Evaluations ML17292A4111996-08-0909 August 1996 Proposed Tech Specs,Revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 ML17292A3561996-07-0909 July 1996 Proposed Tech Specs,Revising Rev a, Including Changes in Vol 7.Proposed Rev Does Not Change Conclusion of NSHC or Environ Assessment Provided Rev a ML17292A7241996-05-31031 May 1996 Offsite Dose Calculation Manual. ML17292A2741996-04-25025 April 1996 Rev 0 to UT-WNP2-208V0, Exam Summary Sheet. ML20107M3391996-04-24024 April 1996 Proposed Tech Specs,Modifying TS to Support Cycle 12, Scheduled to Begin Subsequent to Spring 1996 Outage ML17292A1511996-04-22022 April 1996 Proposed Tech Specs,Supplementing TS That Describes Administrative & Editorial Changes to Section 6.0, Administrative Controls. ML17291B2801996-03-19019 March 1996 Proposed Tech Specs Re Containment Leakage Testing ML17291B2491996-02-26026 February 1996 Proposed Tech Specs,Submitting Revised Copy of TS Bases Which Include Minor Changes & Clarifications Made Per Requirements of 10CFR50.59 ML17333A0201996-01-19019 January 1996 Proposed Tech Specs Re Primary Containment Leakage Testing ML17291B1751995-12-31031 December 1995 Reactor Power Uprate Startup Test Rept, for WNP-2. W/951215 Ltr ML17291B0941995-10-26026 October 1995 Proposed Tech Specs,Replacing Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A9911995-08-16016 August 1995 Proposed Tech Specs Page 3/4 4-4,incorporating Surveillance Notes in Front of Surveillances 4.4.1.2.1 & 4.4.1.2.2 for Jet Pump Operability to Clarify That Notes Apply to Each Surveillance ML17291A9591995-07-28028 July 1995 Operations Instructions OI-23,Rev a to, Human Performance Improvement Program. ML20087E2831995-07-26026 July 1995 Performance Enhancement Strategy 1995 ML17291A8401995-06-0606 June 1995 Proposed Tech Specs Index,Deleting Ref to Bases Pages ML17291A8371995-06-0606 June 1995 Proposed Tech Specs Section 6.9.3.2,adding Ref to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications ML17291A8441995-06-0606 June 1995 Proposed Tech Specs Section 6.0, Administrative Controls. 1999-08-27
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML17284A8761999-08-27027 August 1999 Replacement Page 9 of 9 to Attachment 4 of Procedure 13.10.6 ML17292B5731999-03-0101 March 1999 ODCM for WNP-2 ML17284A6431998-05-29029 May 1998 Revised Plant Procedure Sys for Site Wide Procedures, Replacing Pages Located in Manual W/Pages in Package ML17292B2591998-01-31031 January 1998 Offsite Dose Calculation Manual. ML17292A6161996-11-19019 November 1996 Rev 1 to WNP-2 IST Program Plan (Pumps & Valves) 2nd Interval (941213-041212). ML17292A7241996-05-31031 May 1996 Offsite Dose Calculation Manual. ML17292A2741996-04-25025 April 1996 Rev 0 to UT-WNP2-208V0, Exam Summary Sheet. ML17291A9591995-07-28028 July 1995 Operations Instructions OI-23,Rev a to, Human Performance Improvement Program. ML20087E2831995-07-26026 July 1995 Performance Enhancement Strategy 1995 ML17291B1621995-03-0606 March 1995 Rev 9 to Procedure Qci 6-4, Ultrasonic Exam Feedwater Nozzle Inner Radii. ML17291A1341994-06-16016 June 1994 Pages 9 & 10 to Rev 11 to PPM 13.12.15,inadvertently Omitted from Original Submittal ML17291A6661994-04-30030 April 1994 WNP-2 Odcm. ML17290A9951993-12-31031 December 1993 Amend 16 to Odcm. ML17290A3771993-05-27027 May 1993 Amend 1 to Inservice Insp Program Plan,First Insp Interval. New Relief Request Will Be Submitted to Define Areas of Limited Exam of RPV nozzle-to-shell Welds ML17272B0141993-04-28028 April 1993 Amend 1 to Vols 1-3 of ISI Program Plan. ML17289B2621993-02-22022 February 1993 Rev 1 to LTI7.4, Operations Liaison Responsibilities. ML17289B1931993-01-31031 January 1993 Offsite Dose Calculation Manual. ML17289A7811992-07-31031 July 1992 Revised Plant Procedures Manual Including Rev 10 to 13.8.2, Backup Emergency Dose Projection Sys Operations & Rev 7 to 13.11.1, Recovery Manager Duties. ML20097H7511992-04-23023 April 1992 Plant Procedure 10.25.89, One Hour - Three Hour Fire Barrier Installation ML17289A5031992-04-0101 April 1992 Washington Nuclear Plant - 2 Licensed Operator Requalification Program Corrective Action Plan Resolution Documentation. ML17286B1791991-11-21021 November 1991 Rev 4 to Pump & Valve Inservice Test Program Plan,WPPSS-2. ML17286A9051991-06-28028 June 1991 Odcm. ML17286A7381991-04-30030 April 1991 Revised Plant Procedures Manual Including,Procedures 13.7.7, 12.7.8,13.8.1 & 13.11.15 ML17286A4971990-12-0505 December 1990 Revised Epips,Including Rev 8 to 13.8.2,Rev 10 to 13.10.9, Rev 8 to 13.11.13,Rev 8 to 13.14.1,Rev 6 to 13.14.3,Rev 10 to 13.14.4 & Rev 7 to 13.14.9 ML17285B0621990-02-26026 February 1990 Amend 7 to Odcm. ML17285B0501990-02-22022 February 1990 Rev 6 to Plant Procedures Manual 13.8.2, Manual Offsite Dose Calculations. W/900222 Ltr ML20066K0451989-03-28028 March 1989 Rev 5 to Qci 6-4, Ultrasonic Exam Feedwater Nozzle Inner Radii ML17285A2621988-11-30030 November 1988 Amend 6 to Offsite Dose Calculation Manual. ML17285A2511988-11-30030 November 1988 Amend 6 to Offsite Dose Calculation Manual. ML20090M2951987-11-17017 November 1987 Rev 4 to FATE-84-100, Vipre Code Maint Procedures Manual ML20236N3071987-11-0606 November 1987 Corrected Page 16 of Rev 7 to Procedure 13.14.2, Process for Determining Protective Action Recommendations & Protective Action Decisions ML17279A5931987-10-0808 October 1987 Rev 3b to Pump & Valve Inservice Test Program Plan. ML17284A3901987-06-30030 June 1987 Draft A-3453-87-6, Washington Nuclear Plant 2 Generic PRA- Based Insp Plan. ML17278B1221986-11-17017 November 1986 Rev 2 to Emergency Procedure 5.3.6, Reactor Pressure Vessel Flooding (Contingency). ML20215B7551986-07-24024 July 1986 Rev 3 to NDE & I Instruction Qci 6-4, Ultrasonic Exam BWR Nozzle Inner Radius ML20215B7631986-03-20020 March 1986 Rev 3 to NDE & I Instruction Qci 6-13, Ultrasonic Exam of Piping Welds (Manual) ML17278A5681986-01-0606 January 1986 Rev 5 to Emergency Plan Implementing Procedure 13.14.7, Emergency Training. ML17278A5341985-12-20020 December 1985 Rev 3a to Pump & Valve Inservice Test Program Plan. ML17278A4731985-11-0101 November 1985 Revised Emergency Procedures,Including Rev 1 to Procedure 5.0.0, Emergency Procedure General Precautions, Rev 0 to Procedure 5.0.1, Emergency Operating Procedure Flow Chart & Rev 1 to Procedure 5.1.3, Reactor Power Control. ML17278A5491985-09-24024 September 1985 Rev 0 to Procedure Tp 8.6.6, Special Test Procedure for Tdas Class 1E Isolators. ML20133N3611985-09-0909 September 1985 WPPSS-2 Emergency Preparedness Exercise Manual for 850909-13 ML20129B5491985-05-0606 May 1985 Vol 1 of Rev 0 to Inservice Insp Program Plan ML17278A4291985-03-20020 March 1985 Rev 1 to Operating & Engineering Test Procedure 8.2.92, UHS Performance. ML17277B6461985-03-0505 March 1985 Amend 4 to 85-01, Preservice Insp Program Plan, Vols 1-4 ML17277B3101984-02-29029 February 1984 Control Room Design Review Program Plan. ML17277B3091984-02-17017 February 1984 Function & Task Analysis of Emergency Operating Procedures. ML17277B7331983-12-28028 December 1983 Rev 2 to 23A1900AA, RHR Sys. ML17277B0401983-11-0707 November 1983 Rev 6 to Administrative Procedure 1.3.8, Equipment Clearance & Tagging. ML17277B0421983-11-0707 November 1983 Rev 6 to Administrative Procedure 1.5.1, Tech Spec Surveillance Testing Program. ML17277B0361983-11-0707 November 1983 Rev 5 to Administrative Procedure 1.3.1, Standing Orders/ Night Orders. 1999-08-27
[Table view] |
Text
ACCEZ,ERATEWOOCUMENT MSTRISUTION SYSTEM REUULRT~ INFORMATION DISTRIBUTION STEM (RIDE)
ACCESSION NBR:9306030213 DOC.DATE: 93/05/27 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) R
SUBJECT:
Amend l, to "Inservice Insp Program Plan, First Insp Interval." New relief request will be submitted to define areas of limited exam of RPV nozzle-to-shell welds. D DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDV LA 1 0 PDV PD 1 1 CLIFFORD,J 2 2 D INTERNAL: ACRS 6 6 NRR/DE/EMEB 1 1 NUDOCS-ABSTRACT '
1 1 0 OGC/HDS1 1 0 0 CREME 1 1 RES/DSIR/EIB 1 1 EXTERNAL: EGSG BROWN,B 1 1 EG&G RANSOME,C 1 1 NRC PDR 1 1 NSIC 1 1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DONT NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 17
0 0 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Bax 968 ~ 3000 George Wasbtngton Way ~ Rtcbkrnd, Wasbtngton 993524968 ~ 509) 372-5000 May 27, 1993 G02-93-127 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject:
WNP-2, OPERATING LICENSE NPF-21 AMENDMENTNO. 1 TO INSERVICE INSPECTION PROGRAM PLAN, FIRST INSPECTION INTERVAL
References:
- 1) Letter, G02-85-274, dated May 29, 1985, GC Sorensen (SS) to Mr.
W.R. Butler (NRC), "Inservice Inspection Program Plan, Requests for Relief'etter,
- 2) G02-92-240, dated October 16, 1992, GC Sorensen (SS) to NRC, "Inservice Inspection Summary Report, NIS-1, NIS-2, Owner's Reports" The Washington Public Power Supply System (SS) submits five (5) copies of Amendment No. 1 to the Inservice Inspection Program Plan for the first Inspection Interval. Amendment No. 1 replaces in its entirety the Program Plan submitted via Reference 1. The changes made by this amendment are summarized in Attachment 1 to this letter. They consist of editorial changes and updating the Program Plan to current approved NRC commitments.
This amendment does not contain any commitments that have not already been reviewed and approved by the NRC or required by 10CFR50.55a. This submittal commits to revising relief request 2-ISI-001 on RPV shell weld examination coverage in response to 10CFR50.55a issued August 6, 1992. In addition the Supply System will submit a new relief request, per the requirements of 10CFR50.55a, defining areas of limited examination of the RPV nozzle to shell welds. Coverage for these welds was reported in the Refueling Outage 7 ISI Summary Report, Reference 2.
Sincerely, OaooV~
J . Parrish (M Drop 1023) ssistant Managing Director, Operations cc: JB Martin - NRC RV Williams - BPA/399 pt NS Reynolds - Winston & Strawn NRC Site Inspector - 901A
'PDR JW Clifford - NRC 9306030Zi3 930527 ADOCK 05000397'.
PDR'L
1 gl I
I
+~
J P
ATTACHMENT1 AMENDMENT 1 TO ISI PROGRAM PLAN This amendment replaces revision 0 of the ISI Program Plan in its entirety.
The changes made in Amendment 1 consist of editorial, retyping and addition or modifica-tions to existing commitments where NRC approval has already been granted. No changes in this revision modify or change existing approved commitments to the NRC. Editorial changes are defined as correcting spelling, grammar, capitalization, punctuation and page numbering. No changes to meaning of sentences were done under editorial type changes.
Two commitments are made in this submittal:
- 1) Relief request 2-ISI-001 will be modified after vessel examinations are completed at R8 or R9 to reflect the requirements in August 6, 1992 10CFR50.55a. This regula-tion revoked all relief requests for the RPV shell welds and requires plants to perform 100% examination. WNP-2 can perform 100% examination on almost all of these welds. The exact percentages will be known at the conclusion of the examinations during R8 or R9.
- 2) A new relief request will be submitted to NRC prior to 12/13/94 to identify the volume of RPV nozzle welds that could be examined. The extent of these examina-tions was reported in the 1992 ISI Summary Report, which was submitted to the NRC.
Major changes to the Program Plan:
Description of snubber testing program was removed from the ISI Program. The ISI Program Plan now references the Technical Specifications where this program is described. This will eliminate any chance of making conflicting commitments in this program. The safety-related snubber list remains in the ISI Program Plan as Table 6-2.
Changes to GL 88-01 commitments made by the Supply System through October, 1992 (Letter G02-92-241, dated October 16,1992, GC Sorensen to NRC, "Response to Generic Letter 88-01"). All of these changes have been reviewed and approved by NRC gast letter from NRC was dated January 19, 1993, "Alternate Schedule for IGSCC Inspections" ).
Changes to extent of RPV shell weld exams as described above (10CFR50.55a, dated August 6, 1992).
k fj
Two new commitments: 1) to revise relief request 2-ISI-001 after RPV examinations are completed; and 2) to summit a new relief request identifying RPV nozzle to shell welds which cannot be completely examined due to part geometry. Both commit-ments are required by 10CFR50.55a.
Added Volume 3. The Weld & Component Diagrams will be in this new volume while the schedule of examinations will remain in Volume 2.
I~
r
AMENDMENT 1 TO ISI PROGRAM PLAN Replace Pages New Pages Reason for Change 1-1 thru 1-2, Rev 0 1-1 thru 1-2, Amend 1 Add Volume 3. Split examination schedule and diagrams into sepa-rate volumes.
2-1 thru 2-27, Rev 0 2-1 thru 2-22, Amend 1 Update page revision status. Edito-2-23 thru 2-27 deleted rial 3-1, Rev 0 3-1, Amend 1 Update to GL 88-01 commitments approved by NRC 3-2, Rev 0 3-2, Amend 1 Add FFTR commitment on RFW nozzle inspection. NRC approved 3-3 thru 3-5, Rev 0 3-3 thru 3-5, Amend 1 Editorial changes 3-6, Rev 0 3-6, Amend 1 Editorial, section 14.0 split into schedule tables and ISI diagrams.
New 3-6a, Amend 1 Added 1st interval inspection sched-ule New 3-6b, Amend 1 Editorial, blank page 3-7, 3-8, Rev 0 3-7, 3-8, Amend 1 Editorial changes. Removed defi-nitions for snubber testing.
3-9, 3-10, Rev 0 3-9, 3-10, Amend 1 Editorial changes 4-1, Rev 0 4-1, Amend 1 Added Code Cases and GL 88-01 commitments. NRC approved.
Editorial changes, 4-2, Rev 0 4-2, Amend 1 Editorial changes Table 4-1, Rev 0 Table 4-1, Amend 1 Editorial changes. Category B-D changed complies with Sec XI from "yes" to "no". Geometry prevents full Code volume examination.
Commit to providing relief request prior to interval end (12/13/94).
Category C-F replaced table C-F with ones from C-F-1, C-F-2 W83 Code.
4-3, Rev 0 4-3, Amend 1 Editorial changes, new page 4-3, Rev 0 4-4, Amend 1 Editorial changes. Added reference to August 6, 1992 10CFR50.55a.
A lt l
'I 4
AMENDMENT 1 TO ISI PROGRAM PLAN Replace Pages New Pages Reason for Change 4-4, Rev 0 4-5, Amend 1 Added relief requests ISI-2-008 and ISI-2-009. NRC approved. Page number different.
4-5, Rev 0 4-6, Amend 1 Editorial changes. Page number different. Changed number of welds affected by relief request from 13 to correct number - 16. The relief request approved by NRC identified 16 welds. (Ref letter G02-86-679, 7/22/86.)
4-6, Rev 0 4-7, Amend 1 Editorial changes. Page number different.
4-7, Rev 0 4-8, Amend 1 Editorial changes. Added reference to August 6, 1992, 10CFR 50.55a.
Page number different.
4-8, Rev 0 4-9, Amend 1 Editorial changes. Added reference to August 6, 1992 10CFR 50.55a.
New commitment- Revise this relief request prior to end of interval.
Page number different, 4-9 thru 4-10, Rev 0 4-10 thru 4-11, Amend 1 Deleted relief request not approved.
Page number different.
4-11 thru 4-18, Rev 0 4-12 thru 4-19, Amend 1 Editorial changes. Different page 4-19 thru 4-26, Rev 0 4-20 thru 4-27, Amend 1 Revised Relief Request. NRC approved. Different pages.
New 4-28 thru 4-32, Amend 1 New relief requests ISI-2-008 and 2-009. NRC approved.
5-1, Rev 0 5-1, Amend 1 Added reference to FSAR 5.2.3.2.3. Editorial changes.
5-2 thru 5-8, Rev 0 5-2 thru 5-8, Amend 1 Editorial changes 5-9, Rev 0 5-9i thru 5-9vii, Amend 1 Replaced Table 5-2 with one that identifies welds by IGSCC cate-gory.
5-10, Rev 0 5-10, Amend 1 Added NRC approved FFW'IR RFW nozzle examinations.
r
~ ~ k ~ q s e, ~
5 U I~
AMENDMENT 1 TO ISI PROGRAM PLAN Replace Pages New Pages Reason for Change 5-11, Rev 0 5-11, Amend 1 RFW erosion transferred to erosion/
corrosion program. Added non-mandatory RWCU thermal sleeve examination.
6-1 thru 6-3, Rev 0 6-1 thru 6-3, Amend 1 Editorial changes 6-4, thru 6-7, Rev 0 6-4, thru 6-7 Amend 1 Removed snubber testing program description and referenced Techni-cal Specifications, which describes the program. Program description in one place- TS Table 6-1, Rev 0 Table 6-1, Amend 1 Updated table for component sup-ports that have been added, deleted or modified. Now includes all snub-bers within Section XI scope.
Table 6-2, Rev 0 Table 6-2, Amend 1 Updated table for, safety-related snubbers that have been added, deleted or modified.
7-1 thru 7-14 and 7-1 thru 7-14 and associ- Editorial changes all text pages 7-1, associated boundary ated boundary diagrams, 7-2, etc. Boundary diagrams, diagrams, Rev 0 Amend 1. Boundary ISI-200, ISI-217, etc revised to re-diagrams updated to latest flect current plant configuration.
revision.
8-1, Rev 0 8-1, Amend 1 Editorial changes. Table 8-1 does not exist.
8-2, Rev 0 8-2, Amend 1 Editorial changes. New commit-ment. Identified the basis for SS visual acceptance standard since Reference Code does not have one.
9-1, Rev 0 9-1, Amend 1 Editorial changes Table 9-1, Rev 0 Table 9-1, Amend 1 Editorial changes/updated UTCB drawings.
UTCB-XXX UTCB-XXX, current Updated to current approved revi-revision sion.
Table 9-2, Rev 0 Table 9-2, Amend 1 Editorial changes. Added several calibration blocks to table/updated UTCB drawings
V a+ l ll I'
AMENDMENT 1 TO ISI PROGRAM PLAN Replace Pages New Pages Reason for Change 10-1, Rev 0 10-1, Amend 1 Editorial changes 11-1, Rev 0 11-1, Amend 1 Editorial changes 11-2, Rev 0 11-2, Amend 1 Editorial changes Organizational changes 12-1, Rev 0 12-1, Amend 1 Editorial changes 13-1, Rev 0 13-1, Amend 1 Editorial changes 14-1 thru 14-4, Rev 0 14-1 thru 14-4, Amend 1 Editorial changes
0 , '0 I
C li