Proposed Tech Specs Modifying SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc,Battery E-B1-2
ML17284A707
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/17/1998
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17284A706 List:
References
NUDOCS 9807290136
Download: ML17284A707 (5)


Text

DC Sources Operating 3.8.4 SURVEILLANCE REQUIREMENTS continued SURVEILLANCE FREQUENCY SR 3.8.4.5 Verify battery connection resistance is 12 months

< 24.4 E-6 ohms for inter-cell connectors of the Division 1 and 2 batteries,

< 169 E-6 ohms for inter-cell connectors of the Division 3 battery, and < 20% above the resistance as measured during installation for inter-tier and inter-rack connectors.

SR 3.8.4.6 Verify each required battery charger 24 months supplies the required load for a 1.5 hours at.

a. a 126 V for the 125 V battery chargers; and
b. a 252 V for the 250 V battery charger.

SR 3.8.4.7 -NOTES

1. The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7 once per 60 months.*
2. This Surveillance shall not be performed in MODE 1, 2, or 3.

However, credit may be taken for unplanned events that satisfy this SR.

Verify battery capacity is adequate to 24 months supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.

(continued)

  • Rote 1 is modified to allow the performance gscharge test in SR 3.8.4 8 to be performed in lieu of the

~

service test in SR 3.8.4.7 for Battery E-81-2 until SR 3.8.4.7 is performed during the R-14 refueling outage or a forced outage of sufficient duration to perform the service test and accomplish the necessary post test battery recovery actions.

MNP-2 3.8-2T Amendment No. 449

'P807290X36 'M07l7 PDR ADGCK 05000S97 P PDR

l

. EXIGENT TECHNIC ECIFICATION AlVKÃDMENT <UEST TECHNICAL SPEC IPICA PION SIEI THILL ANCE EEQ SHIPMENT 3 8. II Attachment 5

DC Sources Operating 3.8.4 SURVEILLANCE REQUIREMENTS continued SURVEILLANCE FRE(UENCY SR 3.8.4.5 Verify battery connection resistance is 12 months

< 24.4 E-6 ohms for inter-cell connectors of the Division 1 and 2 batteries,

< 169 E-6 ohms for inter-cell connectors of the Division 3 battery, and < 20% above the resistance as measured during installation for inter-tier and inter-rack connectors.

SR 3.8.4.6 Verify each required battery charger 24 months supplies the required load for a 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> at-:

a. a 126 V for the 125 V battery chargers; and
b. a 252 V for the 250 V battery charger.

SR 3.8.4.7 -- NOTES

1. The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7 once per 60 months.*
2. This Surveillance shall not be performed in MODE 1, 2, or 3.

However, credit may be taken for unplanned events that satisfy this SR.

Verify battery capacity is adequate to 24 months supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.

(continued)

  • Note 1 is modified to allow the performance, discharge test in SR 3.8.4.8 to be performed in lieu of the service test in SR 3.8.4.7 for Battery E-81-2 until SR 3.8.4.7 is performed during the R-14 refueling outage or a forced outage of sufficient duration to perform the service test and accomplish the necessary post test battery recovery actions.