ACCELERATED DISTRIBUTION DEMONSTPATION SYSTEM REGULA& INFORMATION DISTRIBUTIONYSTEM (RIDE)

ACCESSiON NBR:9208120098 DOC.DATE: 92/07/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION

.SCHNELL,J.L. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Revised plant procedures manual including rev 10 to 13.8.2, "Backup Emergency Dose Projection Sys Operations" & rev 7 to 13.11.1, "Recovery Manager Duties." I DISTRIBUTION COP ": A045D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submi al: Emergency Preparedness Plans, Implement'g Pr cedures, C NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 PD 1 1 DEAN,W. 1 1 D

INTERNAL: AEOD/DOA/IRB 1 1 NRR PB9D 1 1 NUDOCS-ABSTRACT 1 1 EG LF~~ 01 1 1 D EXTERNAL: NRC PDR 1 1 NSIC 1 1 R

D D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WAS'ONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED)

TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL 8

jl X

'A

WAS)IINGTOK PUBLIC POWB)

SUPPLV SVSTXuVr INTEROFFICE MEMORANDUM DATE: July 31, 1992 TO: Distribution FROM J. L. h, Plant Administration, WNP-2 (927A)

SUBJECT:

WNP-2 PLANT PROCEDUM~B MANUAL- VOLUME 13 PACKAGE NO.92-183 AMENDMENT

REFERENCE:

PPM *1.2.4 The editorial pages sent out with Package 92-183 were not on Controlled Copy paper.

Please replace the pages you received with the enclosed pages.

P~rcedure Rev Title ~Pa 13.8.2 10 Backup Emergency Dose Projection System Operations 3,4 of 19 13.11.1 7 Recovery Manager Duties 6of10 To verify receipt and inclusion of these Procedures, please sign, date and return this receipt to SHERYL THOMASON, 927A within TEN 1 W RKIN DAYS of the date of this IOM.

Date Signature of Manual Holder Controlled Copy Number JLS/st Attachments t'000 920812009B '))20731

'F...

PDR ADOCK 05000397

'DR'

0 V

~ ~

t ll I

Dl TRIB N- V L 1 ontinued Control

~M'1 Dro Mm Lgggiin 63 Emergency Training 1020 64 Radwaste Control Room 927A 66 Simulator, Shift Manager 1034 68 Remote Shutdown Room (13.4. 1) 927A 69 EOF Communications Center (EOFCC) 1021 73 Dept. Soc. & Health Serv.

74 Dept. Soc. & Health Serv.

75 Dept. Soc. & Health Serv.

78 Shift Technical Advisor 927A 80 Plant Records 927A 82 EOF Decision Center 1020 83 MUDAC 1020 86 Simulator, Shift Technical Advisor (STA) 1034

~87 ~Document Control Desk, NRC 90 Corporate Communications 325 92 Emergency Preparedness Program 1020 93 Radiological Programs 1020 94 Offsite Agency Center 1020 95 Security Decision Center 1020 96 Crisis Management Center 325 97 Technical Data Center 1020 98 Corporate Library 330 102 Telecommunication Services 1032 104 Emergency Preparedness Program 1020 105 NRC Emergency Response 1020 106 Emergency Preparedness Program 1020 114 EOF Decision Center 1020

'23 Planning & Scheduling 988P 126 Asst. Managing Director for Operations 1023 127-132 (6) Licensed Training 1027 133 Emergency Planning 1020 134-136 (3) >

MUDAC Field Team Kits (Sec. 9, 13. 13 .4, 13.14.4) 1020 137-140 (4) MPF Field Team Kits (13.5.4, 13.7.5, S ec. 9, 1020 13.13.4, and 13.14.4) 141 Reliability Centered Maintenance (TOC 0 nly) 142 Pacific N.W. Labs 146 FEMA RX Liason 148 Emergency Planning N/A Kathy McCullough (IOM Only) 917Y N/A Sheryl Thomason (IOM Only) 927A Plant Admin. w/o 927A Susan Legard (IOM Only) 909 Page 2 of 2

DI TRIB N - V LUME 13 Control

~o )y Lamgun ~Mu'1 D~rp 2 Control Room 927A 3 Shift Manager 927A 5 Licensed Training 1027 6 Simulator 1034 7 Technical Manager PE27 8 Operations Manager 9270 HP/Chemistry Manager

'27K 9

10 Maintenance Manager 927S ll Plant Admin. Manager 927S 12 Engineering Services PE13 17 Central Training Services (Sec. 14) 1027 20 Chemistry Supervisor 927A 21 Health Physics Supervisor 927A 25 Project Manager, Bechtel 964D 26 Region V, NRC 27 Security Programs Manager 1021 28 Region V, NRC 29 WNP-3 Technical Library 700 30 EOF Records Room 1020 31 TSC Emergency Response 927A 33 Admin. Security Specialist 953 34 HP Technicians Office 927A 35 Resident Inspector 901A 36 Emergency Preparedness Program 1020 37 Mgr. of Emerg Plann & Environ Prog 1020 42 Maintenance Training 184 46 HS&FP PE12 47 Director, Projects 580 49 Security Training/Evaluation 1021 50 Plant Emergency Director 927A 52 Division of Emergency Management 53 Division of Community Development 54 Dept. Soc. & Health Serv. (Seattle) 55 Federal Emergency Mgmt. Agency 56 Emergency Preparedness Coordinator 57 Benton County Dept of Emerg. Mgmt.

58 WNP-2 Security (SAS) 913 59 WNP-2 Security (CAS) 913 60 WNP-2 Security 913 61 Operations Support Center/Cabinet Lunchroom of 2

'age 1

~R ~Ac ion BEDPS Operator (Cont.) e. Answer the interactive questions based on your judgement and Plant conditions, uch as those that may be listed on MUDAC Calculati n Worksheet (similar to Attachment 4.1), or Control om Calculation Worksheet (similar to Attachment 4.4), provide the basis for TRS-80 EDPS calculations.

The TRS-80 does not ha e a printer capability so EDPS calculations may be list on a worksheet similar to Attachment 4.3.

N~TB: In the eve~ of BEDPS program failure from the TRS-80 Model 1 s memory, the program can be reloaded from th magnetic tape cassette stored with the TRS-80 by doin the following:

Connec the tape recorder/player to the TRS-80 using e supplied cable.

Tu on the TRS-80. Set tape recorder volume co ol to "P".

~ I sert the cassette containing the BEDPS.BA rogram and rewind. Reset tape counter to 000.

e sure that the recorder/player is set for rem te control. (Pause is set to Out)

Press PLAY key and be sure that it locks down.

Access BAS from the Main Menu of the TRS-80 (positi cursor over BASIC and press ENTER).

Type L AD BED and press ENTER.

The TRS-80 will search the tape for the BEDPS.BA program and rint the names of any files it passes over. Once EDPS.BA is loaded, the TRS-80 will print OK.

PROCEDURE NUMBER VISION PhOE 13.8.2 10 3 of19

IVIII ~Acti o BEDPS Operator (Cont.) Tpp ~AV A. 2 p p I rewind tape, remove tape and disconnect tape recorder.

I~M/I A

a. Enter menu number for BEDPS or RASCAL selection.
b. Ensure laser printer is on.
c. Read and follow instructions shown on screen.
d. Default values must be entered.
e. If needed, a backup disk for the PS/2 is located in the

'disc storage file in the MUDAC equipment cabinet, When a full page is not produced by the laser printer, you must eject the partial page before you begin another set of calculations.

4. When directed, complete Attachment 4.1, Offsite Dose Calculation Worksheet. See Attachment 4.2 for instructions for completing Attachment 4.1.
5. Using the information on the worksheet, answer the questions as they appear on the computer screen, Always press ENTER after answering each question.
6. At the completion of the program, a Summary of Doses will be displayed.
7. RASCAL will display a dose map of effective committed doses.
8. Copy the results onto Attachment 4.3, Summary of EDPS Backup Calculation and attach RASCAL results when requested.
9. Perform calculations for 1.2, 2.0, 3.0+, 5.0 and 10 miles downwind. Perform calculations for any other distance downwind, as needed.

PROCEDURE NUMEER REVISION PAGE

/

13,8.2 10 4 of 19

A

',g I I

t

CGNTROLLED CGPY CHE KLT T F RRE VERY D Time

~~~1~ ~ni i~l N T AKE R EMER A. Contact the PEP and obtain briefing on event and actions taken to mitigate.

B. Assure the designated JIC Director has emergency event information for mahng timely and accurate releases of information to the public.

ATIN T TAK FR A. Contact the PEP and obtain briefing on event and actions taken to mitigate.

B. Assure the designated JIC Director has emergency event information for making timely and accurate releases of information to the public.

C. Direct notifications be made for partial or full EOF activation as you deem necessary.

A N T TAKEF RAL T:

A. Notify Plant Emergency Director upon your arrival at the EOF and obtain briefing on event status and mitigation activities.

B. Maintain log until secretary arrives.

C. Determine when EOF can be declared ACTIVATED, then:

1) Relieve PED of RM duties.
2) Assume responsibility for PAR notifications.
3) Direct CRASH-initiate and EOF PA announcements be made to inform emergency centers of RM duty transfer.

D. Inform Managing Director/Rep as required.

Attachment 4.1 Page 1 of 3 PROCBDURB NUhIBBR RBYISION PAOB 13.11.1 6of10