Proposed Tech Specs Re Response Time Testing Requirements
ML17292A753
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/20/1997
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17292A752 List:
References
NUDOCS 9704010091
Download: ML17292A753 (6)


Text

REQUEST FOR ENFO CEMENT DISCRETION TO TEC ICAL SPECIFICATION RESPONSE TIME TESTING REQUIREMENTS Attachment 1 Proposed Technical Specification pages 97040i009i 970320 05000397 PDR ADQCK P

PDR

t Definitions 1.1 1.1 'Definitions DOSE EQUIVALENT I-131 Power and Test Reactor Sites;" Table E-7 of (continued) Regulatory Guide 1.109, Rev. 1, NRC, 1977; or ICRP 30, Supplement to Part 1, page 192-212, Table titled "Committed Dose Equivalent in Target Organs or Tissues per Intake of Unit Activity."

EMERGENCY CORE COOLING The ECCS RESPONSE TIME shall be that time interval SYSTEM (ECCS) RESPONSE from when the monitored parameter exceeds its ECCS TIME initiation setpoint at the channel sensor until the ECCS equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge pressures reach their required values, etc.). Times shall include diesel generator starting and sequence loading delays, where applicable. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire res onse time is measured.

END OF CYCLE The EOC-RPT SYSTEM RESPONSE TIME shall be that RECIRCULATION PUMP TRIP time interval from initial signal generation by (EOC-RPT) SYSTEH RESPONSE the associated turbine throttle valve limit 'switch TIME or from when the turbine governor valve hydraulic control oil pressure drops below the pressure switch setpoint to complete suppression of the electric arc between the fully open contacts of the recirculation pump circuit breaker. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured.

ISOLATION SYSTEH The ISOLATION SYSTEM RESPONSE TIME shall be that RESPONSE TIME time interval from when the monitored parameter exceeds its isolation initiation setpoint at the channel sensor until the isolation valves travel to their required positions. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured.

(continued)

(,. g,.(..kd v)~"" RF~Po PBviPu>e~ ~nA

(~ ,.g .Wi.d./.~y ;p,~edlous/g WNP-2 1.1-3 Amendment No. 149

eQ i'~

y

'I 1

r I

4 k

Definitions 1.1

1. 1 Defin'itions (continued)

RATED THERMAL POWER RTP shall be a total reactor core heat transfer (RTP) rate to the reactor coolant of 3486 MWt.

REACTOR PROTECTION The RPS RESPONSE TIME shall be that time interval SYSTEM (RPS) RESPONSE from when the monitored parameter exceeds its RPS TIME trip setpoint at the channel sensor until de-energization of the scram pilot valve solenoids. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured.

SHUTDOWN MARGIN (SDH) SDH shall be the amount of reactivity by which the reactor is subcritical or would be subcritical assuming that:

a. The reactor is xenon free;
b. The moderator temperature is 68'F; and
c. All control rods are fully inserted except for the single control rod of highest reactivity worth, which is assumed to be fully withdrawn.

With control rods not capable of being fully inserted, the reactivity worth of these control rods must be accounted for in the determination of SDH.

STAGGERED TEST BASIS A STAGGERED TEST BASIS shall consist of the testing of one of the systems, subsystems, channels, or other designated components during the interval specified by the Surveillance Frequency, so that all systems, subsystems, channels, or other designated components are tested during n Surveillance Frequency intervals, where n is the total number of systems, subsystems, channels, or other designated components in the associated function.

THERMAL POWER THERMAL POWER shall be the total reactor core heat transfer rate to the reactor coolant.

TURBINE BYPASS SYSTEM The TURBINE BYPASS SYSTEM RESPONSE TIME shall be RESPONSE TIME the time from when the turbine bypass control unit generates a turbine bypass valve flow signal until 80% of the turbine bypass capacity is established.

continued WNP-2 1.1-6 Amendment No. 149 7 ~~ gpgf'DOGE