|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML17284A9121999-10-13013 October 1999 Proposed Tech Specs 3.3.6.1,Table 3.3. 6.1-1, Primary Containment Isolation Instrumentation. ML17284A8521999-07-29029 July 1999 Proposed Tech Specs 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17284A8491999-07-29029 July 1999 Proposed Tech Specs,Revising SR 3.5.2.2 Re Condensate Storage Tank Water Level ML17284A8461999-07-29029 July 1999 Proposed Tech Specs,Revising Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & E.A. ML17284A8421999-07-29029 July 1999 Proposed Tech Specs Revising SR of TS 3.8.4, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17333A0021999-04-20020 April 1999 Proposed Tech Specs Section 3.4.11,replacing Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6341999-04-0707 April 1999 Proposed Tech Specs Modifying MCPR Safety Limits to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B4881998-12-17017 December 1998 Proposed Tech Specs SR 3.8.1.8,allowing Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML20198A7051998-11-30030 November 1998 Revs 8 Through 13 to TS Bases & Revs 12 Through 15 of Licensee Controlled Specs ML17284A7181998-08-0505 August 1998 Proposed Tech Specs SR 3.8.4.7,allowing Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7071998-07-17017 July 1998 Proposed Tech Specs Modifying SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc,Battery E-B1-2 ML17292B2831998-03-0909 March 1998 Proposed Tech Specs Establishing Interim SLMCPR for Siemens Power Corp ATRIUM-9X Fuel Applicable to Cycle 14 Only ML17292B1321997-12-0404 December 1997 Proposed Tech Specs Modifying Min Critical Power Ratio Safety Limits ML17292B0281997-08-14014 August 1997 Proposed Tech Specs Revising TS 5.5.6 by Adding Note That Would Extend Interval Requirement to Perform Full Stroke Exercise Testing of TIP-V-6 Until 1998 Refueling Outage ML17292A9691997-08-12012 August 1997 Proposed Tech Specs Supporting Request for Enforcement Discretion for Period of 45 Days from TS Action 3.6.1.3.A Required Actions to Isolate Purge Line & Verify Penetration Flow Path Isolated Every 31 Days ML17292A9421997-07-16016 July 1997 Proposed Tech Specs Adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 EFPYs ML17292A8901997-06-0606 June 1997 Revised Tech Spec Page 2.0-1 Modified to Indicate That SLMCPR for ATRIUM-9X Fuel Applies Only to Cycle 13 & Corresponding Bases Pages ML17292A8651997-05-20020 May 1997 Proposed Tech Specs,Requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A7631997-03-24024 March 1997 Rev 7 to Licensee Controlled Specs. ML17292A7621997-03-24024 March 1997 Rev 5 to TS Bases. ML17292A7581997-03-22022 March 1997 Proposed Tech Specs Modifying Response Time Testing SR for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A7531997-03-20020 March 1997 Proposed Tech Specs Re Response Time Testing Requirements ML17292A6591997-01-14014 January 1997 Proposed Tech Specs Reflecting Compilation of TS Change Requests Submitted to NRC in Ltrs Dtd 951208,960709 & 1212 ML17292A6341996-12-12012 December 1996 Proposed Tech Specs Requesting Conversion Based Upon NUREG-1434,rev 1 ML17292A5511996-10-15015 October 1996 Proposed Tech Specs Re Secondary Containment & SGTS to Reflect Revised Secondary Containment Drawdown & post- Accident Analyses Results ML17292A5411996-10-10010 October 1996 Proposed Tech Specs Requesting Addition of Section 2B(6) Re Storage of Byproduct,Source & Special Nuclear Materials ML17292A4501996-09-0606 September 1996 Proposed Tech Specs,Containing Corrections to Factual Statements & Proposed Info to Clarify Evaluations ML17292A4111996-08-0909 August 1996 Proposed Tech Specs,Revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 ML17292A3561996-07-0909 July 1996 Proposed Tech Specs,Revising Rev a, Including Changes in Vol 7.Proposed Rev Does Not Change Conclusion of NSHC or Environ Assessment Provided Rev a ML20107M3391996-04-24024 April 1996 Proposed Tech Specs,Modifying TS to Support Cycle 12, Scheduled to Begin Subsequent to Spring 1996 Outage ML17292A1511996-04-22022 April 1996 Proposed Tech Specs,Supplementing TS That Describes Administrative & Editorial Changes to Section 6.0, Administrative Controls. ML17291B2801996-03-19019 March 1996 Proposed Tech Specs Re Containment Leakage Testing ML17291B2491996-02-26026 February 1996 Proposed Tech Specs,Submitting Revised Copy of TS Bases Which Include Minor Changes & Clarifications Made Per Requirements of 10CFR50.59 ML17333A0201996-01-19019 January 1996 Proposed Tech Specs Re Primary Containment Leakage Testing ML17291B0941995-10-26026 October 1995 Proposed Tech Specs,Replacing Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A9911995-08-16016 August 1995 Proposed Tech Specs Page 3/4 4-4,incorporating Surveillance Notes in Front of Surveillances 4.4.1.2.1 & 4.4.1.2.2 for Jet Pump Operability to Clarify That Notes Apply to Each Surveillance ML17291A8441995-06-0606 June 1995 Proposed Tech Specs Section 6.0, Administrative Controls. ML17291A8401995-06-0606 June 1995 Proposed Tech Specs Index,Deleting Ref to Bases Pages ML17291A8371995-06-0606 June 1995 Proposed Tech Specs Section 6.9.3.2,adding Ref to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications ML17291A7561995-04-25025 April 1995 Proposed Tech Specs,Adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SRs to Tables 3.3.2-1,3.3.2-2 & 4.3.2.1-1 ML17291A6541995-02-10010 February 1995 Proposed Tech Specs,Modifying Surveillance Acceptance Criteria from 10% to 20% for Individual Jet Pump diffuser- to-lower Plenum Differential Pressure Variations of Individual Jet Pump from Established Patterns ML17291A4811994-10-31031 October 1994 Proposed Tech Spec Relocating Safety/Relief Valve Position Indication Instrumentation Requirements ML17291A4781994-10-31031 October 1994 Proposed Tech Spec 3/4.1.3.1, Reactivity Control Sys. ML17291A4451994-10-12012 October 1994 Corrected Proposed TS Bases 3/4.2.6, Power/Flow Instability. ML17291A4221994-09-26026 September 1994 Proposed Tech Specs,Reflecting Use of Siemens Power Corp Staif Code for Stability Analysis,Per Ieb 88-007,Suppl 1 ML17291A3981994-09-18018 September 1994 Proposed TS Table 3.6.3-1 Re Primary Containment Isolation Valve Requirements ML17291A3191994-08-0808 August 1994 Proposed Tech Specs 4.0.5 Re Guideliness for Inservice Insp & Testing Program ML17291A2171994-07-12012 July 1994 Proposed Tech Specs for Relocation of TS Tables for Instrument Response Time Limits ML17291A2221994-07-0808 July 1994 Proposed TS W/Regard to Control Rod Scram Insertion Testing Under Emergency Circumstances ML17291A1561994-06-23023 June 1994 Proposed Tech Specs Re Supporting Hydrostatic Testing 1999-07-29
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17284A9121999-10-13013 October 1999 Proposed Tech Specs 3.3.6.1,Table 3.3. 6.1-1, Primary Containment Isolation Instrumentation. ML17284A8761999-08-27027 August 1999 Replacement Page 9 of 9 to Attachment 4 of Procedure 13.10.6 ML17284A8491999-07-29029 July 1999 Proposed Tech Specs,Revising SR 3.5.2.2 Re Condensate Storage Tank Water Level ML17284A8421999-07-29029 July 1999 Proposed Tech Specs Revising SR of TS 3.8.4, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17284A8461999-07-29029 July 1999 Proposed Tech Specs,Revising Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & E.A. ML17284A8521999-07-29029 July 1999 Proposed Tech Specs 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17333A0021999-04-20020 April 1999 Proposed Tech Specs Section 3.4.11,replacing Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6341999-04-0707 April 1999 Proposed Tech Specs Modifying MCPR Safety Limits to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B5731999-03-0101 March 1999 ODCM for WNP-2 ML17292B4881998-12-17017 December 1998 Proposed Tech Specs SR 3.8.1.8,allowing Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML20198A7051998-11-30030 November 1998 Revs 8 Through 13 to TS Bases & Revs 12 Through 15 of Licensee Controlled Specs ML17284A7181998-08-0505 August 1998 Proposed Tech Specs SR 3.8.4.7,allowing Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7071998-07-17017 July 1998 Proposed Tech Specs Modifying SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc,Battery E-B1-2 ML17284A6431998-05-29029 May 1998 Revised Plant Procedure Sys for Site Wide Procedures, Replacing Pages Located in Manual W/Pages in Package ML17292B2831998-03-0909 March 1998 Proposed Tech Specs Establishing Interim SLMCPR for Siemens Power Corp ATRIUM-9X Fuel Applicable to Cycle 14 Only ML17292B2591998-01-31031 January 1998 Offsite Dose Calculation Manual. ML17292B1321997-12-0404 December 1997 Proposed Tech Specs Modifying Min Critical Power Ratio Safety Limits ML17292B0281997-08-14014 August 1997 Proposed Tech Specs Revising TS 5.5.6 by Adding Note That Would Extend Interval Requirement to Perform Full Stroke Exercise Testing of TIP-V-6 Until 1998 Refueling Outage ML17292A9691997-08-12012 August 1997 Proposed Tech Specs Supporting Request for Enforcement Discretion for Period of 45 Days from TS Action 3.6.1.3.A Required Actions to Isolate Purge Line & Verify Penetration Flow Path Isolated Every 31 Days ML17292A9421997-07-16016 July 1997 Proposed Tech Specs Adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 EFPYs ML17292A8901997-06-0606 June 1997 Revised Tech Spec Page 2.0-1 Modified to Indicate That SLMCPR for ATRIUM-9X Fuel Applies Only to Cycle 13 & Corresponding Bases Pages ML17292A8651997-05-20020 May 1997 Proposed Tech Specs,Requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A8301997-03-31031 March 1997 Wppss WNP-2 RPV Surveillance Matls Testing & Analysis. ML17292A7621997-03-24024 March 1997 Rev 5 to TS Bases. ML17292A7631997-03-24024 March 1997 Rev 7 to Licensee Controlled Specs. ML17292A7581997-03-22022 March 1997 Proposed Tech Specs Modifying Response Time Testing SR for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A7531997-03-20020 March 1997 Proposed Tech Specs Re Response Time Testing Requirements ML17292A6591997-01-14014 January 1997 Proposed Tech Specs Reflecting Compilation of TS Change Requests Submitted to NRC in Ltrs Dtd 951208,960709 & 1212 ML17292A6341996-12-12012 December 1996 Proposed Tech Specs Requesting Conversion Based Upon NUREG-1434,rev 1 ML17292A6161996-11-19019 November 1996 Rev 1 to WNP-2 IST Program Plan (Pumps & Valves) 2nd Interval (941213-041212). ML17292A5511996-10-15015 October 1996 Proposed Tech Specs Re Secondary Containment & SGTS to Reflect Revised Secondary Containment Drawdown & post- Accident Analyses Results ML17292A5411996-10-10010 October 1996 Proposed Tech Specs Requesting Addition of Section 2B(6) Re Storage of Byproduct,Source & Special Nuclear Materials ML17292A4501996-09-0606 September 1996 Proposed Tech Specs,Containing Corrections to Factual Statements & Proposed Info to Clarify Evaluations ML17292A4111996-08-0909 August 1996 Proposed Tech Specs,Revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 ML17292A3561996-07-0909 July 1996 Proposed Tech Specs,Revising Rev a, Including Changes in Vol 7.Proposed Rev Does Not Change Conclusion of NSHC or Environ Assessment Provided Rev a ML17292A7241996-05-31031 May 1996 Offsite Dose Calculation Manual. ML17292A2741996-04-25025 April 1996 Rev 0 to UT-WNP2-208V0, Exam Summary Sheet. ML20107M3391996-04-24024 April 1996 Proposed Tech Specs,Modifying TS to Support Cycle 12, Scheduled to Begin Subsequent to Spring 1996 Outage ML17292A1511996-04-22022 April 1996 Proposed Tech Specs,Supplementing TS That Describes Administrative & Editorial Changes to Section 6.0, Administrative Controls. ML17291B2801996-03-19019 March 1996 Proposed Tech Specs Re Containment Leakage Testing ML17291B2491996-02-26026 February 1996 Proposed Tech Specs,Submitting Revised Copy of TS Bases Which Include Minor Changes & Clarifications Made Per Requirements of 10CFR50.59 ML17333A0201996-01-19019 January 1996 Proposed Tech Specs Re Primary Containment Leakage Testing ML17291B1751995-12-31031 December 1995 Reactor Power Uprate Startup Test Rept, for WNP-2. W/951215 Ltr ML17291B0941995-10-26026 October 1995 Proposed Tech Specs,Replacing Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A9911995-08-16016 August 1995 Proposed Tech Specs Page 3/4 4-4,incorporating Surveillance Notes in Front of Surveillances 4.4.1.2.1 & 4.4.1.2.2 for Jet Pump Operability to Clarify That Notes Apply to Each Surveillance ML17291A9591995-07-28028 July 1995 Operations Instructions OI-23,Rev a to, Human Performance Improvement Program. ML20087E2831995-07-26026 July 1995 Performance Enhancement Strategy 1995 ML17291A8401995-06-0606 June 1995 Proposed Tech Specs Index,Deleting Ref to Bases Pages ML17291A8371995-06-0606 June 1995 Proposed Tech Specs Section 6.9.3.2,adding Ref to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications ML17291A8441995-06-0606 June 1995 Proposed Tech Specs Section 6.0, Administrative Controls. 1999-08-27
[Table view] |
Text
~ . REQUEST FOR MENT .
MSRMIM CRITICA WSS RATIO SASSTT LRCTS Attachment 2, Page 1 of 1 Marked Up Technical SpeciTication Pages
~ Technical Specification 2.1.1.2 Safety Limits (page 2.0-1) is modified to change the single loop MCPR limit for ABB fuel from 1.08 to 1.09 and to limit the use of the MCPR limits for the ATRIUM-9fuel to Cycle 14:
2.1.1.2 With the reactor steam dome pressure 2 785 psig and core flow 2 100/o rated core flow:
The MCPR for ATRIUM-9Xfuel shall be 2 1.13 for two recirculation loop operation or 2 1. 14 for single recirculation loop operation. For ABB fuel, the MCPR shall be 2 1.07 for two-recirculation loop operation or 2 1.09 for single recirculation "loop operation. The MCPR limits for the ATIGUM-9Xfuel are applicable to Cycle 14.
~ (Information Only) BASES Section 2.1:1.2 MCPR (pages B 2.0-3) is changed to acknowledge the
~
use of an interim additive constant uncertainty for the SPC ATRIUM-9Xfuel for Cycle 14 by
'modifying the following sentence (see attached page markup): ~
Reference 7 describes the interim use of increased ANFB additive constant uncertainty for the SPC ATRIUM-9Xfuel during Cycle 14.
4' 4
SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs, 2.1.1 Reactor Core SLs
- 2. 1. 1. 1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow:
THERMAL POWER shall be a 25% RTP.
'I 2.1.1.2 With the reactor steam dome pressure a 785 psig and core flow a 10% rated core flow:
The MCPR for ATRIUM-9X fuel shall be a 1.13 for two recirculation loop operation or ~ 1'.14 for single, recirculation loop operation. For all other fuel, the MCPR sha 1 be a 1.07 for two recirculation loop operation or ~ 1.08 for single recirculation loop operation. The MgPR sm~ts for the ATRIUM-9X fuel are applicable to cycl e (fP~o
- 2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.
- 2. 1.2 Reactor Coolant S stem Pressure SL Reactor steam dome pressure shall be a 1325 psig.
2.2 SL Violations With any SL, violation, the following actions shall be completed within 2 hours:
2.2. 1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control rods.
WNP-2 2.0-1 . Amendment No. 449 151
Reactor Core SLs
'B 2.1.1 BASES APPLICABLE 2. l. l. 1 Fuel Claddin Inte rit (continued)
SAFETY ANALYSES bundle flow for all fuel assemblies that have a relatively high power and potentially can approach a critical heat flux condition.- The minimum bundle flow
. is > 28 x 10'b/hr. The coolant minimum bundle flow and maximum flow area are such that the mass flux is
> 0.25 x 10'b/hr-ft'. Full scale critical power tests taken at pressures down to 14.7 psia indicate that the fuel assembly critical power at 0.25 x 10'b/hr-ft's approximately 3.35 HWt. At 25% RTP, a bundle power of approximately 3.35 Hwt corresponds to a bundle radial peaking factor of
> 2.9, which is significantly higher than the expected peaking factor. Thus, a THERMAL POWER limit of 25% RTP for reactor pressures < 785 psig is conservative.
2.1.1.2 MCPR
-The HCPR SL ensures sufficient conservatism in the operating HCPR limit that, in the event of an AOO from the limiting condition of operation, at least 99.9% of the fuel rods in the core would be expected to avoid boiling transition. The margin between calculated boiling transition (i .e.,
HCPR = 1.00) and the MCPR SL is based on a detailed statistical procedure that considers the uncertainties in monitoring the core operating state. One specific uncertainty included in the SL is the uncertainty inherent in the critical power correlations. Reference 7 describes the interim use of increased ANFB additive constant uncertainty for the SPC ATRIUM-9X fuel during Cycle~
/P Reference 4 describes the methodology used in determining the HCPR SL for Siemens Power Corporation fuel.'eference 5 describes the methodology used in determining the HCPR SL for ABB CENO fuel.
The critical power. correlations are based on a significant body of practical test data, providing a high degree of assurance that the critical power, as evaluated by the correlation, is within a small percentage of the actual critical power. As long as the core pressure and flow are within the range of validity of the critical power correlations, the assumed reactor conditions used in defining the SL introduce conservatism into the limit because bounding high radial power factors and bounding flat continued WNP-2' 2.0-3 Revision 7
~ ~
4
REQUEST FOR MENT; MINIMUMCRITICA WER RATIO SAFETY LIMITS , Page 1 of 2 Evaluation of Significant Hazards Considerations Summary of Proposed Change:
The Cycle 14 WNP-2 MCPR safety limits for the ATRIUM-9Xfuel are based on the continued use of a change implemented for Cycle 13 (Reference 6) which increased the limits from 1.07 to 1.13 for two loop operation and Rom 1.08 to 1.14 for single loop operation. This change was based on conservative calculations by SPC (Reference 3) using an interim ATRIUM-9X additive constant uncertainty (Reference 5). These calculations are based on a larger pool of data than previous calculations (Reference 1). Also, ABB calculated single loop MCPR limit about 0.006 greater for Cycle 14 than was calculated for Cycle 13 resulting in an increase from 1.08 to 1.09 for the single loop MCPR limit (Reference 7).
No significant Hazards Determination: ~
Washington'Public'Power Supply System has evaluated, the proposed changes to the .Technical. .
Specifications using the criteria established in.10CFR50.92(c) -and has determined that they. do not.
represent a significant hazards consideration as described below.
The operation of WNP-2 in accordance with the proposed amendment will not involve a significant increase in the probability or consequences of an accident previously evaluated.
The probability of an evaluated accident is derived from the probabilities of the individual precursors to that accident, The consequences of an evaluated accident are determined by the operability of plant systems designed to mitigate those consequences. Limits have been established consistent with NRC approved methods to ensure that fuel performance during normal, transient, and accident conditions is acceptable. The proposed Technical Specifications amendment continues the use of conservatively established ATRIUM-9X MCPR safety limits for WNP-2 such that the fuel is protected during normal operation as well as during plant transients or anticipated operational occurrences.
The probability of an evaluated accident is not increased by the continued use of the interim ATRIUM-9XMCPR safety limit of 1.13 (two loop operation) or 1. 14 (single loop operation) or from changing the ABB single loop MCPR safety limit of 1.08 (Cycle 13) to 1.09 (Cycle 14). The changes do not require any physical plant modifications, physically affect any plant component, or entail changes in plant operation. The increase in single loop MCPR safety limit is attributed to a slightly more conservative assembly power distribution used in the Cycle 14 calculations following ABB standard methodology. While the Cycle 13 result is also conservative, the increase in Cycle 14 is intended to accommodate small cycle to cycle variability. Therefore, no individual precursors of an accident are affected.
This Technical Specification amendment proposes to continue using the interim MCPR safety limits for ATRIUM-9Xfuel to protect the fuel during normal operation as well as during plant transients or anticipated operational occurrences. The method that is used to determine the ATRIUM-9X additive constant uncertainty is conservative, such that the resulting interim ATRIUM-9X MCPR safety limits are high enough to ensure that less than 0.1% of the fuel rods are expected to experience boiling transition if the limit is not violated. Using NRC approved methodology, ABB
~ ~
4
}4 }
44 f
+p444 V'w
SIRIMIM CRITICA WRR RATIO SASRTT LMITS , Page 2 of 2 has utilized these interim values as the basis for the Cycle 14 safety limit for the co-resident ATRIUM-9X. Operational limits have been established based on the interim ATRIUM-9X MCPR safety limits to ensure that the safety limits are not violated. This will ensure that the fuel design safety criteria (more than 99.9% of the fuel rods avoid transition boiling during normal operation as well as anticipated operational occurrences) is met. In addition, since the operability of plant systems designed to mitigate any consequences of accidents have not changed, the consequences of an accident previously evaluated are not expected to increase.
The operation of WNP-2 in accordance with the proposed amendment will not create the possibility of a new or different kind of accident from any accident previously evaluated:
Creation of the possibility of a new or different kind of accident would require the creation of one or more new precursors of that accident. New accident precursors may be created by modifications .
of the plant configuration; including changes. in allowable modes of operation. This Technical, Specification submittal does not involve any modifications of the plant configuration or allowable modes of operation. This Technical Specification change continues the use of added conservatism in the ATRIUM-9X MCPR safety limits which, resulted from analytical changes and use of an .
expanded database, Also, ABB has calculated single loop MCPR safety limit about 0.006 greater in Cycle 14 than was used in Cycle 13. The increase in single loop MCPR safety limit is attributed to a slightly more conservative assembly power distribution used in the Cycle 14 calculations following ABB standard methodology. While the Cycle 13 result is also conservative, the increase in Cycle 14 is intended to accommodate small cycle to cycle variability. Therefore, no new precursors of an accident are created and no new or different kinds of accidents are created.
The operation of WNP-2 in accordance with the proposed amendment will not involve a significant reduction in the margin of safety for the following reasons:
The continued use of the interim MCPR safety limits provides a margin of safety by ensuring that less than 0.1% of the rods are expected to be in boiling transition if the MCPR limit is not violated.
These interim limits are based on calculations by SPC using the revised ATRIUM-9X additive constant uncertainty. These calculations are based on a larger pool of data than previous calculations (527 data points versus 82 data points). Additionally, the revised additive constant uncertainty has been conservatively applied in the calculation of the interim ATRIUM-9XMCPR safety limits resulting in more restrictive limits.
The calculated single loop MCPR safety limit results are about 0.006 greater for Cycle 14 than they were for Cycle 13. The increase in single loop MCPR safety limit is attributed to a slightly more conservative assembly power distribution used in the Cycle 14 calculations following ABB standard methodology. Because the fuel design safety criteria of more than 99.9% of the fuel rods avoiding transition boiling during normal operation as well as anticipated operational occurrences is met, there is not a significant reduction in the margin of safety.
~, ~ f I t
'k
~i gf.<~,
-~1
REQUEST FOR MENT, IIIRIMIMCRITICA WAR IIATIORAIRTT LIMITRI , Page 1 of 1 Environmental Assessment Applicability Review Washington Public Power Supply System has evaluated the proposed amendment against the criteria for identification of licensing and regulatory actions requiring environmental assessment in accordance with 10CFR51.21. It has been determined that the proposed changes meet the criteria for categorical exclusion as provided for under 10CFR51.22(c)(9). This conclusion has been determined because the change requested does not pose a significant hazards considerations nor does it involve a significant increase in the amounts,.or, a significant change in the types of any effluent that may be released off-site. Additionally, this request does not involve a significant increase in individual or cumulative occupational radiation exposure..
~ .
P 1
'\
REQUEST FOR MENT.
LSNMIMCSITICA WM ILLTICSASXTT LMITS , Page 1 of 1 Revised Technical Specification Pages
4 4
n t'
>>,W4 'Pt I~
SLs 2.0 2.0.- SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs
- 2. l. l. 1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow:
THERMAL POWER shall be a 25% RTP.
- 2. 1. 1.2 With the reactor steam dome pressure ~ 785 psig and core flow a 10% rated core flow:
The HCPR for ATRIUM-9X fuel shall be a 1.13 for two recirculation loop operation or a 1. 14 for single recirculation loop operation. For all other fuel, the MCPR shall be a 1.07 for two recirculation loop operation or a 1.09 for single recirculation l'oop operation. The
=
MCPR limits for the ATRIUM-9X fuel are applicable to Cycle 14.
- 2. 1. 1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.
- 2. 1.2 Reactor Coolant S stem Pressure SL Reactor steam dome pressure shall be ~ 1325 psig.
2.2 SL Violations With any SL violation, the following actions shall be completed within 2 hours:
2.2. 1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control rods.
WNP-2 2.0-1 Amendment No. 449 kR.
,0 0' P I