ML17309A545: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/23/1994
| issue date = 05/23/1994
| title = Forwards Application for Amend to License DPR-18,increasing Allowable RCA to Improved TS Values (NUREG-1431). Westinghouse Proprietary Rept WCAP-11668 & Nonproprietary Rept WCAP-11678 Encl.Proprietary Rept WCAP-11668 Withheld
| title = Forwards Application for Amend to License DPR-18,increasing Allowable RCA to Improved TS Values (NUREG-1431). Westinghouse Proprietary Rept WCAP-11668 & Nonproprietary Rept WCAP-11678 Encl.Proprietary Rept WCAP-11668 Withheld
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = JOHNSON A R
| addressee name = Johnson A
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000244
| docket = 05000244
Line 15: Line 15:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 71
| page count = 71
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:..ACCELERATEDDISTRIBUTIONDEMONS+ATIONSYSTEMJIREGULATORYINFORMATIONDISTRIBUTIONSYSTEM(RIDS)ACCESSIONNBR:9405310164DOC.DATE:94/05/23NOTARIZED:YESDOCKETFACIL:50-244RobertEmmetGinnaNuclearPlant,Unit1,RochesterG05000244AUTH.*NAMEAUTHORAFFILIATIONMECREDY,R.C.RochesterGas6ElectricCorp.RECIP.NAMERECIPIENTAFFILIATIONJOHNSON,A.R.ProjectDirectorateI-3+5R
{{#Wiki_filter:..ACCELERATED DISTRIBUTION DEMONS+ATION SYSTEM J
I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9405310164                DOC.DATE: 94/05/23    NOTARIZED: YES        DOCKET FACIL:50-244 Robert Emmet            Ginna Nuclear Plant, Unit 1, Rochester      G 05000244 AUTH.*NAME            AUTHOR AFFILIATION MECREDY,R.C.           Rochester Gas 6 Electric Corp.
RECIP.NAME            RECIPIENT AFFILIATION JOHNSON,A.R.               Project Directorate I-3                                     +5    R


==SUBJECT:==
==SUBJECT:==
ForwardsapplicationforamendtolicenseDPR-18,increasingallowableRCAtoimprovedTSvalues(NUREG-1431).IWestinghouseproprietaryreptWCAP-116686nonproprietaryreptWCAP-11678encl.ProprietaryreptWCAP-11668withheld.DDISTRIBUTIONCODE:AP01DCOPIESRECEIVED:LTRJENCLLSIZE:/STITLE:ProprietaryReviewDistribution-PreOperatingLicense6OperatingR/NOTES:LicenseExpdateinaccordancewith10CFR2,2.109(9/19/72).05000244ARECIPIENTIDCODE/NAMEPD1-3LAJOHNSON,ACOPIESLTTRENCL1133RECIPIENTIDCODE/NAMEPD1-3PDCOPIESLTTRENCL11DDINTERNAL:AEO~DOA~GFfQEEXTERNALNRCPDR01111110OGC/HDS110DSNOTETOALL"RIDS"RECIPIENTS:DDPLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMP1-37(EXT.20079)TOELIMINATEYOURNAMEFROMDISTRIBUTIONLISTSFORDOCUMENTSYOUDON'TNEED!TOTALNUMBEROFCOPIESREQUIRED:LTTR9ENCL7 Itg~0<~  
Forwards application for amend to license DPR-18,increasing                          I allowable RCA to improved TS values (NUREG-1431).
/////I///////'g//Z1//I///I/I///////////i////I//////SKfROCHESTERGASANDELECTRICCORPORATIONo89EASTAVENUE,ROCHESTERN.Y.14649-0001ROBERTC.MECREDYVicePresidentClnnaNuclearProductionMay23,1994TELEPHONEhREACODE7tB5462700U.S.NuclearRegulatoryCommissionDocumentControlDeskAttn:AllenR.JohnsonProjectDirectorateI-3Washington,D.C.20555
Westinghouse proprietary rept WCAP-11668 6 nonproprietary rept WCAP-11678 encl. Proprietary rept WCAP-11668 withheld.                         D DISTRIBUTION CODE: AP01D TITLE: Proprietary Review COPIES RECEIVED:LTR Distribution J ENCL  L    SIZE:     / S Pre Operating License 6 Operating    R NOTES:License Exp date          in accordance with 10CFR2,2.109(9/19/72).
                                                                                                  /
05000244 A
RECIPIENT                COPIES          RECIPIENT          COPIES            D ID  CODE/NAME            LTTR ENCL      ID CODE/NAME        LTTR ENCL PD1-3 LA                      1    1    PD1-3 PD                1    1            D JOHNSON,A                    3    3 INTERNAL:   AEO~D    OA                  1    1    OGC/HDS1                1    0
            ~GF fQE          01          1    1 EXTERNAL    NRC PDR                      1    0 D
S D
D NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                9  ENCL    7
 
g~
It 0 < ~
 
                  /////I/////// 'g//Z1
                //I///   I/ I///////////
i/ ///I     /         /////SKf ROCHESTER GAS AND ELECTRIC CORPORATION                          o  89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 ROBERT C. MECREDY                                                                                  TELEPHONE Vice President                                                                              hREA CODE 7 t B 546 Clnna Nuclear Production                                  May 23, 1994                                          2700 U.S. Nuclear Regulatory Commission Document                          Control Desk Attn:                               Allen R. Johnson Project Directorate I-3 Washington, D.C.                             20555


==Subject:==
==Subject:==
ApplicationforAmendmenttoOperatingLicenseReactorCoolantActivityTechnicalSpecificationsRochesterGasandElectricCorporationR.E.GinnaNuclearPowerPlantDocketNo.50-244Ref.(a):NRCLetter,C.RossitoA.Ladieu(WOG),"AcceptanceforReferencingofLicensingTopicalReportWCAP-10698...",March30,1987.(b):NUREG-0916,"SafetyEvaluationReportRelatedtotheRestartofR.E.GinnaNuclearPowerPlant",May1982.(c):RG&ELetter,R.MecredytoA.Johnson(NRC),"EmergencyResponseCapability...",October14,1992.(d):NRCLetter,A.JohnsontoR.Mecredy(RG&E),EmergencyResponseCapability-ConformancetoRegulatoryGuide1.97,revision3",February24,1993.(e):WOGLetter,L.WalshandA.EngeltoR.Jones(NRC),"WestinghouseOwnersGroupSteamGeneratorTubeUncoveryIssue",March31,1992.(f):NRCLetter,R.JonestoL.Walsh(WOG),"WestinghouseOwnersGroup,SteamGeneratorTubeUncoveryIssue",March10,1993.
Application for    Amendment to Operating License Reactor Coolant Activity Technical Specifications Rochester Gas and Electric Corporation R.E. Ginna Nuclear Power Plant Docket No. 50-244 Ref.(a):                           NRC Letter, C. Rossi to A. Ladieu (WOG), "Acceptance for Referencing of Licensing Topical Report WCAP-10698...",
March 30, 1987.
(b):               NUREG-0916, "Safety Evaluation Report Related to the Restart of R.E. Ginna Nuclear Power Plant", May 1982.
(c):               RG&E  Letter,   R. Mecredy  to  A. Johnson     (NRC), "Emergency Response  Capability...",   October 14, 1992.
(d):               NRC  Letter, A. Johnson to R. Mecredy (RG&E), Emergency Response Capability        Conformance to Regulatory Guide 1.97, revision    3", February  24, 1993.
(e):               WOG Letter,     L. Walsh and A. Engel to R. Jones (NRC),
                                          "Westinghouse Owners Group Steam Generator Tube Uncovery Issue", March 31, 1992.
(f):               NRC Letter, R. Jones to L. Walsh           (WOG), "Westinghouse Issue", March Owners Group, Steam Generator Tube Uncovery 10, 1993.


==DearMr.Johnson:==
==Dear Mr. Johnson:==
WCAP-11668(Proprietary)/WCAP-11678(Non-Proprietary)evaluatethepotentialradiologicalconsequencesduetoasteamgeneratortuberupture(SGTR)fortheR.E.GinnaNuclearPowerPlant.Thisg'Ti4053101b4'Tl40523PDR"ADOt"K'05000244ThepurposeofthisapplicationforAmendmenttoOperatingLicenseistoamendAppendixAofthatLicensetoincreasetheTechnicalSpecificationallowableprimarycoolantiodine(I-131)activitylimitfrom0.2pC+igmto1.0pCi/gm;andthetotalprimarycoolantactivityfrom84/EpCi/gmtotheStandardTechnicalSpecificationvalueof100/EpCi/gm,consistentwiththeImprovedTechnicalSpecifications(NUREG-1431).
 
evaluationutilizestheanalysismethodologyofWCAP-10698-P-A"SGTRAnalysisMethodologytoDeterminetheMargintoSteamGeneratorOverfill."RG&EhasmettherequirementsforusageofWCAP-10698asoutlinedinNuclearRegulatoryCommissionletterfromC.E.Rossi(NRC)toA.E.Ladieu(WOG),(Referencea).Theletterrequiredeachutilitytoprovidefiveplantspecificinputs:1.Demonstrationthatcriticaloperatoractiontimesusedintheanalysisarerealisticandconsistentwiththoseobservedduringsimulatorexercises.2.AsitespecificSteamGeneratorTubeRuptureradiologicaloffsiteconsequenceanalysis.3.Astructural,analysisofthemainsteam'inesdemonstratingadequacyunderwater-filledconditions.4.Alistofsystems,components,andinstrumentationcreditedforaccidentmitigationandthespecifiedsafetygradeforeach.5.Acomparisonoftheplanttothe"boundingplant"usedinWCAP-10698.Items2and5areaddressedin.thesitespecificanalysisbeingsubmittedwiththisletter,WCAP-11668(Proprietary).Item3wasaddressedduringthereviewoftheSteamGeneratorTubeRuptureincidentatGinnaStation.ItsacceptabilityisdocumentedinNUREG-0916,(Referenceb).Item4iscontainedinourpost-accidentinstrumentationsubmittal(Referencec)(re.RegulatoryGuide1.97).NRCreviewandacceptanceofthisinformationisdocumentedinreferenced.Item1isdiscussedbelow.DuringtheweekofAugust19through23,1991simulatorrunsofthetwomostlimitingcasesidentifiedinWCAP-11668(Proprietary)/WCAP-11678(Non-Proprietary),weremadetovalidateassumedoperatorresponsetimes.ThesesimulatorrunsdemonstratedthatnotonlyweretheoperatorresponsetimesassumedintheWCAPsconservativewithadequatemargin,butalsothatrecentrefinementsintheemergencyoperatingprocedureshavefurtherreducedthelikelihoodofoverfillingtherupturedsteamgenerator.Forthetwolimitingcasesidentifiedoperatorresponsepreventedoverfillwithsignificantmargin,andterminatedbreakflowinunder45minutes.InbothcasesitwasnecessarytousetheWCAPassumedtimesforoperatoractionoutsidethecontrolroom.Thesetimeswerethelimitingfactorsinthescenarios,ascontrolroomoperatorshadtowaittoproceedwithfurthermitigatingactionsuntiltheseactionswereassumedtobecompleted.Operatorcritiquefollowingthesessionsindicatedthattheyfeltthesetimeswereunrealisticallyconservative.We,therefore,feelthatactualmitigationtimeswouldbeevenlessthanthosedemonstratedduringthesimulatorexercise.WCAP-11668/11678assumesthetuberuptureremainscoveredthrough-ItI outtheevent.Morerecentlyithasbeensuggestedthat,thisassumptionmaynotbeconservative.TheWestinghouseOwnersGroup(WOG)hasundertakenaprogramtoassesstheconsequencesoftuberuptureuncovery.Theresultsindicatethattheincreaseindosesisinsignificant.Theseresultsweretransmittedtothestaff(Referencee).Thestaffhasreviewedandapprovedthistransmittal(referencef).Therefore,wefeelthisissuehasbeenadequatelyaddressed.ItshouldbenotedthataproposaltomodifySection3.1.4.3.ahasalreadybeensubmittedtotheNRCvialetterMay13,1994.Page3.1-21ofAttachmentsBandCisbeingsubmittedinbothversions,sothatapprovalisnotdependentonthesequenceofproposedLicenseAmendmentRequestreviews.WerequestthatuponNRCapproval,thisamendmentshouldbeconsideredeffectiveimmediatelyandimplementedwithin60days.Veryrulyyours,oertc.ecryBJF/190Attachment
The purpose                          of this application for Amendment to Operating License is to                    amend Appendix A          of that License to increase the Technical Specification allowable primary coolant iodine (I-131) activity limit from 0.2 pC+igm to 1.0pCi/gm; and the total primary coolant activity from 84/E pCi/gm to the Standard Technical Specification value of 100/E pCi/gm, consistent with the Improved Technical Specifications (NUREG-1431).
WCAP-11668                           (Proprietary)/WCAP-11678 (Non-Proprietary) evaluate the potential radiological consequences due to a steam generator tube rupture (SGTR) for the R. E. Ginna Nuclear Power Plant.                                                   This
'Ti4053101b4'Tl40523 PDR" ADOt"K'05000244 g
 
evaluation utilizes the analysis methodology of WCAP-10698-P-A "SGTR Analysis Methodology to Determine the Margin to Steam Generator Overfill." RG&E has met the requirements for usage of WCAP-10698 as outlined in Nuclear Regulatory Commission letter from C. E. Rossi (NRC) to A. E. Ladieu (WOG), (Reference a). The letter required each utility to provide five plant specific inputs:
: 1. Demonstration that critical operator action times used in the analysis are realistic and consistent with those observed during simulator exercises.
: 2. A  site specific Steam Generator      Tube Rupture  radiological offsite consequence analysis.
: 3. A    structural,   analysis      of  the    main  steam 'ines demonstrating adequacy under          water-filled conditions.
: 4. A    list of systems, components, and instrumentation credited for accident mitigation and the specified safety grade    for each.
: 5. A  comparison of the plant      to the "bounding plant" used in WCAP-10698.
Items 2 and 5 are addressed in .the site specific analysis being submitted with this letter, WCAP-11668 (Proprietary). Item 3 was addressed during the review of the Steam Generator Tube Rupture incident at Ginna Station. Its acceptability is documented in NUREG-0916,     (Reference b).       Item 4 is contained in our post-accident instrumentation submittal (Reference c) (re. Regulatory Guide 1.97).       NRC review and acceptance        of this information is documented  in reference d.       Item  1 is discussed  below.
During the week of August      19 through 23, 1991 simulator runs of the two most  limiting    cases  identified in    WCAP-11668   (Proprietary)/
WCAP-11678     (Non-Proprietary), were made to validate assumed operator response times. These simulator runs demonstrated that not only were the operator response times assumed in the WCAPs conservative with adequate margin, but also that recent refinements in the emergency operating procedures have further reduced the likelihood of overfilling the ruptured steam generator. For the two limiting cases identified operator response prevented overfill with significant margin, and terminated break flow in under 45 minutes. In both cases        it  was necessary to use the WCAP assumed times for operator action outside the control room. These times were the limiting factors in the scenarios,                 as control room operators had to wait to proceed with further mitigating actions until these actions were assumed to be completed.                   Operator critique following the sessions indicated that they felt these times were unrealistically conservative. We, therefore, feel that actual mitigation times would be even less than those demonstrated during the simulator exercise.
WCAP-11668/11678 assumes the tube rupture remains covered through-
 
It I
 
out the event.     More recently      it  has been suggested that, this assumption may not be conservative. The Westinghouse Owners Group (WOG) has undertaken a program to assess        the consequences of tube rupture uncovery. The results indicate that the increase in doses is insignificant. These results were transmitted to the staff (Reference e).       The staff has reviewed and approved this transmittal (reference    f). Therefore,   we  feel this issue has been adequately addressed.
It should be noted that a proposal to modify Section 3.1.4.3.a has already been submitted to the NRC via letter May 13, 1994. Page 3.1-21 of Attachments B and C is being submitted in both versions, so that approval is not dependent on the sequence of proposed License Amendment Request reviews.
We request    that upon NRC approval, this amendment should be considered effective immediately and implemented within 60 days.
Very  ruly yours, o ert c. ecr    y BJF/190 Attachment


==Enclosures:==
==Enclosures:==
1~One(1)submittalofanApplicationforAmendmenttoOperatingLicenseandassociatedsafetyevaluation.2~3~4~One(1)copyofanApplicationforWithholding,CAW-87-123,datedDecember3,1987,accompanyingAffidavit,andProprietaryInformationNoticeOne(1)copyofWCAP-11668,"LOFTTR2AnalysisofPotentialRadiologicalConsequencesFollowingaSteamGeneratorTubeRuptureattheR.E.GinnaNuclearPlant",November1987(Proprietary).One(1)copyofWCAP-11678,"LOFTTR2AnalysisofPotentialRadiologicalConsequencesFollowingaSteamGeneratorTubeRuptureat,theR.E.GinnaNuclearPlant",November1987(Non-Proprietary).xc>>Mr.AllenR.Johnson(MailStop14Dl)ProjectDirectorateI-3Washington,D.C.20555U.S.NuclearRegulatoryCommissionRegionI475AllendaleRoadKingofPrussia,PA19406GinnaSeniorResidentInspector WESTINGHOUSEPROPRIETARYCLASS2WCAP"1166874>5'9QVLOFTTR2ANALYSISOFPOTENTIALRADIOLOGICALCONSEQUENCESFOLLOWINGASTEAMGENERATORTUBERUPTUREATTHER.E.GINNANUCLEARPOWERPLANT0.J.MendlerK.RubinNOVEMBER1987NuclearSafetyDepartmentThisdocumentcontainsinformationproprietarytoWestinghouseElectricCorporation;itissubmittedin.confidenceandistobeusedsolelyforthepurposeforwhichitisfurnishedandreturneduponrequest.Thisdocumentandsuchinformationisnottobereproduced,transmitted,disclosedorusedotherwiseinwholeorinpartwithoutauthorizationofWestinghouseElectricCorporation,NuclearEnergySystems.WestinghouseElectricCorporationNuclearEnergySystemsP.O.Box355Pittsburgh,Pennsylvania152301987byWestinghouseElectricCorporation1074v:1OP/120487 IP.'\10 WESTINGHOUSEPROPRIETARYCLASS2ThisdocumentcontainsmaterialthatisproprietarytotheWestinghouseElectricCorporation.Thispropr'ietaryinformationhasbeenmarkedbymeansofbrackets.ThebasisformarkingthematerialproprietaryisidentifiedbymarginalnotesreferringtothestandardsinSection8oftheaffidavitofR.A.Wiesemannofrecord"IntheHatterofAcceptanceCriteriaforEmergency.CoreCoolingSystemsforLightWaterCooledNuclearPowerReactors(DocketNo.RH-50-1)"atteanscriptpages3706through3710(February24,1972).'DuetotheproprietarynatureofthematerialcontainedinthisreportwhichwasobtainedatconsiderableWestinghouseexpenseandthereleaseofwhichwouldseriouslyaffectourcompetitiveposition,werequestthisinformationtobewithheldfrompublicdisclosureinaccordancewiththeRulesofPractice,10CFR2.790,andthattheinformationpresentedthereinbesafeguardedinaccordancewith10CFR2.903.Webelievethatwithholdingthisinformationwillnotadverselyaffectthepublicinterest.ThisinformationisforyourinternaluseonlyandshouldnotbereleasedtopersonsororganizationsoutsidethedirectorateofRegulationandtheACRSwithoutpriorapprovalofWestinghouseElectricCorporation.Shoulditbecome1necessarytoreleasethisinformationtosuchpersonsaspartofthereviewprocedure,pleasecontactWestinghouseElectricCorporationandtheywillmakethenecessaryarrangementsrequiredtoprotecttheirproprietary'nterests.1D74v:1D/7120B7 WESTINGHOUSEPROPRIETARYCLASS2TABLEOFCONTENTSPacaesI.INTRODUCTIONII.THERHALHYDRAULICANALYSISA.B.C.D.E.F.DesignBasisAccidentConservativeAssumptionsOperatorActionTimesTransientDescription-Case1TransientDescription-Case2HassReleases236132434III.RADIOLOGICALCONSEQUENCESANALYSISIV.CONCLUSION4358V.REFERENCES591074v:1D/112087 00-WESTINGHOUSEPROPRIETARYCLASS2I.INTRODUCTIONAnevaluationofthepotentialradiologicalconsequencesduetoasteamgeneratortuberupture(SGTR)eventhasbeenperformedfortheR.E.GinnanuclearpowerplanttodemonstratethattheoffsiteradiationdoseswillbelessthantheallowableguidelinesbasedontheStandardTechnicalSpecificationlimitonprimarycoolantactivity.Theevaluationdiscussedhereinassumesthat151.ofthesteamgeneratortubesareplugged.AdesignbasissteamgeneratortuberupturewasanalyzedforGinnausingthemethodologydevelopedinMCAP-10698(reference1)andthesupplementtoHCAP-10698(reference2).TwosinglefailurecaseswereconsideredtodeterminewhichisthemostlimitingsinglefailureforGinnawithrespecttoradiological.consequences.Thetwocasesexaminedwere:a,cCase1Intactsteamgeneratorpoweroperatedreliefvalve(PORV)failsclosedandmustbelocallyopened.Case2Rupturedsteamgeneratorpoweroperatedreliefvalvefailsopenandmustbelocallyisolated.PlantresponsetotheeventwasmodeledusingtheLOFTTR2computercodewithconservativeassumptionsofbreaksizeandlocation,condenseravailabilityandinitialsecondarywatermassinthefaultedsteamgenerator.Theanalysismethodologyincludesthesimulationoftheoperatoractionsforrecoveryfrom'steamgeneratortuberupturebasedontheWestinghouseOwnersGroupEmergencyResponseGuidelines,whicharethebasisfortheGinnaEmergencyOperatingProcedures.ThemassreleaseswerecalculatedwiththeLOFTTR2~programfromtheinitiationoftheeventuntilterminationofthebreakflow.Forthetimeperiodfollowingbreakflowtermination,steamreleasesandfeedwaterflowsfromtheintactandfaultedsteamgeneratorsweredeterminedfromamassandenergybalanceusingthecalculatedRCSandsteamgeneratorconditionsatthetimeofleakagetermination.Themassreleasesforbothcaseswereusedtodeterminetheradiationdosesattheexclusionareaboundaryandlowpopulationzoneassumingthattheprimarycoolantactivity'isattheStandardTechnicalSpecificationlimitpriortotheaccident.1074v:1D/112087 MESTINGHOUSEPROPRIETARYCLASS2II.THERMALHYDRAULICANALYSISIntegratedmassreleasestotheatmosphereandcondenserduringasteamgeneratortuberuptureeventwerecalculatedforvarioustimeperiodsduringtheaccident.ThissectionincludesthemethodsandassumptionsusedtomodeltheSGTReventandcalculatethemassreleases,aswellasthesequenceofeventsfortherecovery.A.DesinBasisAccidentTheaccidentmodeledisthecompleteseveranceofasteamgeneratortubelocatedatthetubesheetonthecoldlegside.Itwasalsoassumedthatlossofoffsitepoweroccurredatthetimeofreactortrip,andtheworstrodwasassumedtobestuckatreactortrip.a,cThemostlimitingsinglefailurewithrespecttosteamgeneratoroverfillwasdeterminedbyreference1tobeafailedclosedPORVontheintactsteamgenerator.SinceGinnaisatwoloopplant,theintactsteamgeneratorPORVmustbelocallyopenedbeforeRCScooldowncanbegin.ThisadditionaltimetolocallyopentheintactsteamgeneratorPORVwilldelayRCSdepressurization,causinganincreaseintotalprimarytosecondaryleakage.Consequently,morewaterwillaccumulateinthefaultedsteamgenerator.ThecasewheretheintactsteamgeneratorPORVfailstoopenondemandandmustbelocallyopenedwillbereferredtoasCase1.Themostlimitingsinglefailurewithrespecttooffsitedoseswasdeterminedbyreference2tobeafailedopenPORVonthefaulte'dsteamgenerator.FailureofthisPORVwillcauseanuncontrolleddepressurizationofthefaultedsteamgeneratorwhichwillincreaseprimarytosecondaryleakage.PressureintherupturedsteamgeneratorwillremainbelowthatintheprimarysystemuntilthefailedPORVcanbeisolated,andrecoveryactionscompleted.Thecasewherethefaulted'teamgeneratorPORVfailsopenandmustbelocallyisolatedwillbereferredtoasCase2.1074v:1D/112087 WESTINGHOUSEPROPRIETARYCLASS2B.ConservativeAssumtionsPlantresponsesandmassreleasesfromtheintactandfaultedsteamgeneratorpriortobreakflowterminationwerecalculatedusingLOFTTR2.WhilemodelingtheSGTReventthefollowingassumptionsweremade:1.ReactorTrionOvertemeratureDelta-Ta,cAturbinerunbackcanbeinitiatedautomaticallyortheoperatorcanmanuallyreducetheturbineloadtoattempttopreventareactortriponovertemperaturedelta-T.Althoughturbinerunbackissimulatedinthisanalysis,creditis.nottakenfordelayingreactortrip.Reactortripisassumedtooccuronovertemperaturedelta-T.Duetotheassumedlossofoffsitepowerthecondenserisnotavailableforsteamreleasesoncethereactoristripped.Consequently,afterreactortripthesteamgeneratorPORYsareusedforsteamreleases.Thusanearliertriptimeleadstomoresteamreleasedtotheatmospherefromthefaultedandintactsteamgenerators.2.PoweraTheinitialsteamgeneratorwatermassdecreaseswithincreasingpowerlevel.,Thus,alowerinitialpowerresultsinahigherinitialsteamgeneratorsecondarywatermasswhichisconservative.Onthisbasis,100%nominalpowerwasassumedfortheanalysisratherthanconsideringanoverpowerfactor.3.PressurizerWaterLevelTheRCSdepressurizationrateincreasesafterthepressurizerempties.Ahigherpressurizerwaterlevelwillincreasethetimerequiredforthepressurizertoempty.Thisresultsinmaintainingahigherprimarytosecondarypressuredifferentialandthusalargerbreakflowrateforalongertimeperiod.Therefore,itisconcludedthatmaximizingthepressurizerwaterlevelisconservative.a,c1074v:1D/112087 HESTINGHOUSEPROPRIETARYCLASS24.SteamGeneratorSeoond~arMassAhigherinitialsecondarywatermassintherupturedsteamgeneratorwasdeterminedbyReference1tobeconservativeforoverfill.FortheCase1analysisturbinerunbackwasassumedinitiatedandwassimulatedbyartificiallyincreasinginitialsteamgeneratorwatermass.TheinitialsteamgeneratortotalfluidmasswasassumedtobelOAabovenominalvalueplusthedifferentialmassbetween100%powerand70&#xc3;powertosimulateturbinerunback.However,ifsteamgeneratoroverfilldoesnotoccur,alowerinitialmassintheruptur'edsteamgeneratorresultsinaconservativepredictionofoffsitedoses..Thus,forCase2theinitialsecondarymasswasassumedtocorrespondtooperationat10Kbelownominalsteamgeneratorwatermass.a,c5.BreakLocationThetuberuptureanalyzedisadouble-endedbreakofonesteamgeneratortubelocatedatthetopofthetubesheetontheoutletsideofthesteamgenerator.Thelocationofthebreakonthecoldsideofthesteamgeneratorresultsinhigherprimarytosecondaryleakagethanabreakonthehotsideofthesteamgeneratorasdeterminedbyreference1.Therefore,itisconcludedthatthecoldlegsidebreaklocationisconservative.4i,C6.ReactorTriOelaAsnotedpreviously,theresultsforcaseswhichproduceanearlierreactortriparemoreconservativewithrespecttotheradiologicalconsequencesfromaSGTR.Thus,aminimumdelaytimefromthereactortripsignaltoreactortripisconservativefortheanalysis.Inaddition,asnotedabove,nocreditistakenforturbinerunbackdelayingreactortrip.a,c.1074v:10/112387 ttESTINGHOUSEPROPRIETARYCLASS27.T~tiTiD1Followingareactortrip,theturbinewillbeautomaticallytrippedafterasuitabledelaytime.Minimizingthedelaytimebetweenreactortripandturbinetripreducestheamountofsteamflowtotheturbineandincreasesthe.secondarywaterinventory.Thus,aminimumdelaytimebetweenreactortripandturbinetripisconservativefortheSGTRanalysis.a,c8.SteamGeneratorReliefValvePressureSetointHithalossofoffsitepower,thesecondarypressurewillincreasefollowingreactorandturbinetrip,andsteamwillberelievedthroughthesteamgeneratorPORVsandsafetyvalves.Alowersteamgeneratorreliefvalvepressuresetpointleadstoahigherprimarytosecondarypressuredifferentialandthushigherprimarytosecondaryleakage.Thus,theuseofthelowestsetpointforthesteamgenerator.reliefvalvesisconservativefortheanalysis.SincethePORVsetpointislowerthan.thesafetyvalvesetpoints,theuseofthePORVsetpointof1050psigforsteamreliefismoreconservative,9.PressurizerPressureforSIInitiationTheuseofthemaximumpressurizerpressuresetpointforSIinitiationresultsinearlieractuationoftheSIsystem.Thisleadstothemaintenanceofahigherprimarytosecondarypressuredifferentialandconsequentlyahigherbreakflowrateforalongertimeperiod.Thus,theuseofthemaximumpressurizerpressuresetpointforSIinitiation.intheanalysisisconservative.a,c10.LeakaeafterOverfilla,cOverfillisassumedtooccuriftherupturedsteamgeneratorbecomeswatersolid.Nocreditistakenforsteamlinevolume.1074v:10/112087 WESTINGHOUSEPROPRIETARYCLASS211.FlashinFractiona,cWhencalculatingtheamountofbreakflowthatflashestosteam,100percentofthebreakflowisassumedtocomefromthehotlegsideofthebreak.Sincethetuberuptureflowactuallyconsistsofflowfromthehotlegandcoldlegsidesofthesteamgenerator,thetemperatureofthecombinedflowwillbelessthanthehotlegtemperatureandtheflashingfractionwillbecorrespondinglylower.Thustheassumptionthat100percentofthebreakflowcomesfromthehotlegisconservativeforaSGTRanalysis.C.eratorActionTimesIntheeventofanSGTR,theoperatorisrequiredtotakeactionstostabilizetheplantandterminatetheprimarytosecondaryleakage.Anevaluationhasbeenperformed(reference1)toestablishtheoperatoractiontimesfor'useintheanalysisofadesignbasisSGTRevent.TheoperatoractionswhicharerequiredforrecoveryfromanSGTRandtheavailabledataonthetimestoperformtheseactionshaveb'eenreviewed.TheavailabledataonoperatoractiontimesforanSGTRincludesinformationwhichhasbeenobtainedfromreactorplantsimulatorstudiesaswellasplantdatafromfiveactualSGTRevents.Usingthisdata,operator-actiontimeshavebeenestablished.whichareconsideredtobeappropriateforadesignbasisSGTRevent.TheseoperatoractiontimeswerebeusedasinputfortheanalysisofthedesignbasisSGTRevent.ThemajoroperatoractionsforSGTRrecoverywhichareincludedintheE-3guidelineoftheWestinghouseOwnersGroupEmergencyResponseGuidelineswereexplicitlymodeledintheanalysis.Theoperatoractionsmodeledincludeidentificationandisolationoftherupturedsteamgenerator,cooldownanddepressurizationoftheRCStorestoreinventory,andterminationofSItostopprimarytosecondaryleakage.Theseoperatoractionsaredescribedbelow.1074v:1D/112087 MESTINGHOUSEPROPRIETARYCLASS21.I.dentifytherupturedsteamgenerator(step2).Highsecondarysideactivity,asindicatedbythesteamgeneratorblowdownlineradiationmonitororairejectorradiationmonitor,typicallywillprovidethefirstindicationofanSBTRevent.Therupturedsteamgeneratorcanbeidentifiedbyhighactivityinthecorrespondingsteamgeneratorblowdownline,mainsteamline,orwatersample.ForanSBTRthatresultsinahighpowerreactortrip,thesteamgeneratorwaterlevelwilldecreaseoff-scaleonthenarrowrangeforbothsteamgenerators.Theauxiliaryfeedwater(AFM)flowwillbegintorefillthesteamgenerators,typicallydistributingapproximatelyequalflowtobothsteamgenerators.Sinceprimarytosecondaryleakageaddsadditionalinventorywhichaccumulatesintherupturedsteamgenerator,levelwillreturntothenarrowrangeinthatsteamgeneratorsignificantlyearlierandwillcontinuetoincreasemorerapidly.Thisresponseprovidesconfirmationof.anSGTReventandalsoidentifiestherupturedsteamgenerator.2.Isolatetherupturedsteamgeneratorfromtheintactsteamgeneratorandisolatefeedwatertotherupturedsteamgenerator.(steps3and4).Onceatuberupturehasbeenidentified,recoveryactionsbeginbyisolatingsteamflowfromandstoppingfeedwaterflowtotherupturedsteamgenerator.Inadditiontominimizingradiologicalreleases,thisalsoreducesthepossibilityoffillingtherupturedsteamgeneratorwithwaterby1)minimizingtheaccumulationoffeedwaterflowand2)enablingtheoperatortoestablishapressuredifferentialbetweentherupturedandintactsteamgeneratorsasanecessarysteptowardterminatingprimarytosecondaryleakage.IntheguidelineforsteamgeneratortuberupturerecoveryintheERGs,theoperatorisdirectedtomaintainthelevelintherupturedsteamgeneratorbetweenjustonspanand50%onthenarrowrangeinstrument.Reference1assumedthattherupturedsteamgeneratorwouldbeisolatedwhenlevelinthesteamgeneratorreached[midwaybetweenthesepoints]'074v:1D/112487 WESTINGHOUSEPROPRIETARYCLASS2[(33%narrowrangelevel).]'orGinnaitwasalsoconservativetouse[33percent]'flevelforisolation.Therupturedsteamgeneratorwasassumedtobeisolatedat[33percentnarrowrangelevelorat10minutes,whicheverwaslonger.]'.CooldowntheReactorCoolantSystem(RCS)usingtheintactsteamgenerator(step14).Afterisolationoftherupturedsteamgenerator,theRCSiscooledasrapidlyaspossibletolessthansaturationtemperaturecorrespondingtotherupturedsteamgeneratorpressurebydumpingsteamfromonlytheintactsteamgenerator.Thisensuresadequatesubcoolinginthe.RCSafterdepressurizationtotherupturedsteamgeneratorpressureinsubsequentactions.,Withoffsitepoweravailable,thenormalsteamdumpsystemtothecondenserwillprovidesufficientcapacitytoperformthiscooldownrapidly'.Ifoffsitepowerislost,theRCSiscooledusingthepower-operatedreliefvalve(PORV)ontheintactsteamgeneratorsinceneitherthesteamdumpvalvesnorthecondenserwouldbeavailable.ItisnotedthatRCSpressurewilldecreaseduringthecooldownasshrinkageofthereactorcoolantexpandsthesteambubbleinthepressurizer.4.DepressurizetheRCStorestorereactorcoolantinventory(steps17or18).Whenthecooldowniscompleted,SIflowwillincreaseRCSpressureuntilbreakflowmatchesSIflow.Consequently,SI'flowmustbeterminatedtostopprimarytosecondaryleakage.However,adequatereactorcoolantinventorymustfirstbeassured.ThisincludesbothsufficientreactorcoolantsubcoolingandpressurizerinventorytomaintainareliablepressurizerlevelindicationafterSIflowisstopped.SinceleakagefromtheprimarysidewillcontinueafterSIflowisstoppeduntilRCSandrupturedsteamgeneratorpressuresequalize,an"excess"amountofinventoryisneededtoensure1074v:10/112487 WESTINGHOUSEPROPRIETARYCLASS2pressurizerlevelremainsonspan.The"excess"amountrequireddependsonRCSpressureandreducestozerowhenRCSpressureequalsthepressureintherupturedsteamgenerator.Toreducebreakflowandestablishsufficientpressurizerlevel,RCSpressureisdecreasedbyopeningthepressurizerPORV.5.TerminateSItostopprimarytosecondaryleakage(steps21-23).ThepreviousactionswillhaveestablishedadequateRCSsubcooling,secondarysideheatsink;andreactorcoolantinventoryfollowinganSGTRtoensurethatSIflowisnolongerneeded.Whentheseactionshavebeencompleted,SIflowmustbestoppedtoprevent'epressurizationoftheRCSandtoterminateprimarytosecondaryleakage.PrimarytosecondaryleakagewillcontinueafterSIflowisstoppeduntilRCSpressureandrupturedsteamgeneratorpressuresequalize.Chargingflow,letdown,andpressurizerheaterswillthenbecontrolledtopreventrepressurizationoftheRCS'ndreinitiationofleakageintotherupturedsteam.generator.SincethesemajorrecoveryactionswillbemodelledintheSGTRanalysis,itisnecessarytoestablishthetimesrequiredtoperformtheseactions.Althoughtheintermediatestepsbetweenthemajoractionswillnotbeexplicitlymodelled,itisalsonecessarytoaccountforthetimerequiredtoperformthesteps,Itisnotedthatthetotaltimerequiredtocompletetherecovery-operationsconsistsofbothoperatoractiontimeandsystem,orplant,responsetime;Forinstance,thetimeforeachofthemajorrecoveryoperations(i.e.,RCScooldown,RCSdepressurization,'tc.)isprimarilyduetothetimerequiredforthesystemresponse,whereastheoperatoractiontimeisreflectedbythetimerequiredfortheoperatortoperformtheintermediateactionsteps.'TheoperatoractiontimestoinitiateRCScooldown,RCSdepressurizationandsafetyinjectionterminationweredevelopedinreference1andarelistedinTableII.1.Inadditiontotheoperatoractiontimesdevelopedinreference1,RochesterGasandElectricsuppliedtheoperatoraction1074v:1D/112087 MESTINGHOUSEPROPRIETARYCLASS2timesassociatedwithrecoveringfromthesinglefailures(Reference3).[Theseoperator'actions,whichwouldoccuroutsidethecontrolroom,includelocallyopeningtheintactsteamgeneratorPORV,locallyclosingtheintactsteamgeneratorPORVblockvalveandlocallyclosingthefaultedsteamgeneratorPORVblockvalve.]'hetimesassociatedwithperformingtheseoperatoractionsarelistedinTableII.2.[Itisnotedthatthe20minutestoopentheintactsteamgeneratorPORVconsistsof10minutestoidentifyandlocatethevalveand10minutestolinearlyopenthePORV.DuetolimitationsofLOFTTR2,theoperatoractiontoopentheintactsteamgeneratorPORVwassimulatedasastepopeningaftera15minutedelay,whichresultsinanequivalentintegratedsteamflowthroughthePORVattheendofthe20minuteperiod.]'074v:io/11208710 MESTINGHOUSEPROPRIETARYCLASS2TABLEII.1OPERATORACTIONTIMESFORDESIGNBASISSGTRANALYSISActionTimeminIdentifyandisolaterupturedSGHaximumof10minorcalculatedtimetoreach334narrowrangelevelintherupturedSGOperatoractiontimetoinitiatecooldownCooldownCalculatedtimeforRCScooldownOperatoractiontimetoinitiatedepressurizationDepressurizationCalculatedtimeforRCSdepressurizationOperatoractiontimetoinitiateSIterminationSIterminationandpressureequalizationCalculatedtimeforSIterminationandequalizationofRCSandrupturedSGpressures1074v:1D/112087 WESTINGHOUSEPROPRIETARYCLASS2TABLEII.2ActionGINNASPECIFICOPERATORACTIONTIMESTimeminQ,CFaultedSteamGeneratorPORVBlockValveClosing-LocalAction15IntactSteamGeneratorPORVOpening-LocalAction20IntactSteamGeneratorPORVBlockValveClosing-LocalAction1074v:1D/11208712 II'ESTINGHOUSEPROPRIETARYCLASS2D.TransientDescrition-Case1[Case1addressesaSGTRinwhichthesinglefailureassumedisthattheintactsteamgeneratorPORVfailstoopenondemandandmustbelocallyopened.]'hesequence,ofeventsforCase1ispresentedinTableII.3.Followingthetuberupture,reactorcoolantflowsfromtheprimaryintothesecondarysideoftherupturedsteamgeneratorsincetheprimarypressureisgreaterthanthesteamgeneratorpressure.Inresponsetothislossofreactorcoolant,pressurizerleveldecreasesasshowninFigureII.1.TheRCSpressurealsodecreasesasshowninFigureII.2asthesteambubbleinthepressurizerexpands.AstheRCSpressuredecreasesduetothecontinuedprimarytosecondaryleakage,automaticreactortripoccursonanovertemperaturedelta-Ttripsignal.Afterreactortrip,corepowerrapidlydecreasestodecayheatlevels.Theturbinestopvalvescloseandsteamflowtotheturbineisterminated.Thesteamdumpsystemisdesignedtoactuatefollowingreactortriptolimittheincreaseinsecondarypressure,butthesteamdumpvalvesremainclosedduetothelossofcondenservacuumresultingfromtheassumedlossofoffsitepoweratthetimeofreactortrip.Thus,theenergytransferfromtheprimarysystemcausesthesecondarysidepressuretoincreaserapidlyafter'reactortripuntilthesteamgenerator.PORVslifttodissipatetheenergy,asshowninFigureII.3.TheRCSpressuredecreasesmorerapidlyafterreactortripasenergytransfertothesecondaryshrinksthereactorcoolantandtheleakflowcontinuestodepleteprimaryinventory.ThedecreaseinRCSinventoryresultsinalowpressurizerpressureSIsignal.PressurizerlevelalsodecreasesmorerapidlyfollowingreactortripandthepressurizereventuallyemptiesasshowninFigureII.1.Afterthepressurizerempties,theRCSpressurerapidlydecreasesasshowninFigureII.2.1074v:10/12048713 WESTINGHOUSEPROPRIETARYCLASS2Sinceoffsitepowerisassumedlostatreactor-trip,theRCPstripandagradualtransitiontonaturalcirculationflowoccurs.Immediatelyfollowingreactortripthetemperatureriseacrossthecoredecreasesascorepowerdecays(seeFigure11.4),however,thetemperaturerisesubsequentlyincreasesasnaturalcirculationflowdevelops.Thecoldlegtemperaturestrendtowardthesteamgeneratortemperatureasthefluidresidencetimeinthetuberegionincreases.TheRCStemperaturescontinuetoslowlydecreaseduetothecontinuedadditionoftheauxiliaryfeedwatertothesteamgeneratorsuntiloperatoractionsareinitiatedtocooldowntheRCS.majorOperatorActions1.IdentifyandIsolatetheRupturedSteamGeneratorOnceatuberupturehasbeenidentified,recoveryactionsbeginbyisolatingsteamflowfromtherupturedsteamgeneratorand.throttlingtheauxiliaryfeedwaterflowtotherupturedsteamgenerator.Asindicatedpreviously,therupturedsteamgeneratorisassumedtobeidentifiedandisolatedwhenthenarrowrangelevelreaches[33%]'ntherupturedsteamgeneratororat[10]'inutesafter.initiationoftheSGTR,whicheverislonger.ForGinna,thetimetoreach[33%]'slessthan[10]'inutes,thustherupturedsteamgeneratorisassumedtobeisolatedat[10]'inutes.2.CooldowntheRCStoEstablishSubcoolingMarginAfterisolationoftherupturedsteamgenerator,thereisa[5]'inuteoperator.actiontimeimposedpriortoinitiatingthecooldown.Theactualdelaytimeusedintheanalysisis4secondslongerbecauseofthecomputerprogramrequirementsforsimulatingtheoperatoractions.Afterthistime,actionsaretakentocooltheRCSasrapidlyaspossiblebydumpingsteamfromtheintactsteamgenerators.Sinceoffsitepowerislost,theRCSiscooledbydumpingsteamtotheatmosphereusingthePORVontheintactsteamgenerator.[ForCase1,aspreviouslynoted,theintactsteamgenerator]'074v:1D/11248714 MESTINGHOUSEPROPRIETARYCLASS2[PORVfailstoopen.Fortheanalysis,itwasassumedthatthevalvewasfullyopenedafteranadditionalperiodof15minutes(seepg.10).Thusat1804secondstheintactsteamgeneratorPORVisopenedforRCScooldown.]'hecooldowniscontinuedunti1RCSsubcoolingattherupturedsteamgeneratorpressureis20'Fplusanallowanceof17'Fforsubcoolinguncertainty.[WhentheseconditionsaresatisfieditisassumedthatittakestheoperatorfiveminutestoclosetheintactsteamgeneratorPORVblockvalve.]'tisnotedthatoverfilloftherupturedsteamgeneratoroccursduringthistimeperiodat'[2372]'econds,asshowninFigureII.6.ThiscooldownensuresthattherewillbeadequatesubcoolingintheRCSafterthesubsequentdepressurizationoftheRCStotherupturedsteamgeneratorpressure.ThereductionintheintactsteamgeneratorpressurerequiredtoaccomplishthecooldownisshowninFigureII.3,andtheeffectofthecooldownontheRCStemperatureisshowninFigureII.4.TheRCSpressurealsodecreasesduringthiscooldownprocessduetoshrinkageofthereactorcoolantasshowninFigureII.2.3,DepressurizeRCStoRestoreInventoryAftertheRCScooldown,a[2]'inuteoperatoractiontimeisincludedpriortodepressurization.TheRCSisdepressurizedat2688secondstoassureadequatecoolantinventorypriortoterminatingSIflow.MiththeRCPsstopped,normalpressurizer'prayisnotavailableandthustheRCSisdepressurizedbyopeningapressurizerPORV.Thedepressurizationiscontinueduntilanyofthefollowingconditionsaresatisfied:RCSpressureislessthantherupturedsteamgeneratorpressureandpressurizerlevelisgreaterthan0%plusanallowanceof3%forpressurizerleveluncertainty,orpressurizer,levelisgreaterthan80%minusanallowanceof3%forpressurizerleveluncertainty,orRCSsubcoolingislessthanthe17'Fallowanceforsubcoolinguncertainty.TheRCSdepressurizationreducesthebreakflowasshowninFigureII.5andincreasesSIflowtorefillthepressurizer,asshowninFigureII.1.1074v:10/11248715 WESTINGHOUSEPROPRIETARYCLASS24.TerminateSItoStopPrimarytoSecondaryLeakageThepreviousactionsshouldhaveestablishedadequateRCSsubcooling,verifiedasecondarysideheatsink,andrestoredthereactorcoolantinventoryfollowingaSGTRtoensurethatSIflowisnolongerneeded.Whentheseactionshavebeencompleted,theSIflowmustbestoppedtopreventrepressurizationoftheRCSandtoterminate"primarytosecondaryleakage.TheSIflowisterminatedwhentheRCSpressureincreases,,minimumAFWflowisavailableandatleastoneintactsteamgeneratorlevelisinthenarrowrange,RCSsubcoolingisgreaterthanthe17'Fallowanceforsubcoolinguncertainty,andthepressurizerlevelisgreaterthanthe3Xallowanceforpressurizerleveluncertainty.ToassurethattheRCSpressureisincreasing,SIwasnotterminatedintheanalysisuntiltheRCSpressureincreasedto50psiabovetherupturedsteamgeneratorpressure.Afterdepressurizationiscompleted,anoperatoractiontimeof[1]'inuteisimposedpriortoSItermination.TheprimarytosecondaryleakagecontinuesaftertheSIflowisterminateduntiltheRCSandrupturedsteamgeneratorsequalize.Thisoccurswhen'theintactsteamgeneratorPORVislocallyopenedtocooldowntheRCSsothatsubcoolingmaybemaintained.WhenthePORVisopenedtheincreasedenergytransferfromprimarytosecondarydepressurizestheRCStotheruptured.steamgeneratorpressure.1074v:10/11208716 MESTINGHOUSEPROPRIETARYCLASS2TABLEII.3SEQUENCEOFEVENTSEVENTCASE1Timesecd.,CReactorTrip50Ruptured.SGIsolated600IntactSGPORVOpened1804OverfillRupturedSG2372IntactSGPORVIsolatedPRZRPORVOpenedPRZRPORVClosed256826882738SITerminated2798IntactPORVOpened3288BreakFlowTerminated34281074v:1D/11208717 WESTINGHOUSEPROPRIETARYCLASS2GINNASTEAMGENERATORTUBERUPTUREANALYSIS15PERCENTTUBEPLUGGINGCASE1188.88~78.68.4J68.t448.38.18~8.8..1Ei84.2E+84TINE(SEC).3Ei84.4E~84FigureII.1PressurizerLevel-Case11074v:1D/11208718 MESTINGHOUSEPROPRIETARYCLASS2GINNASTEAMGENERATORTUBERUPTUREANALYSIS15PERCENTTUBEPLUGGINGCASEI.25E+84.225Ei84.2E84.175E'84.15E+84Ld~,12SE~84LJOf~o.1E84Of758.588.258..IE~84.2E84.3E~84TIME(SEC).4E84FigureII.2RCSPressure-Case11074v:10/11208719 MESTINGHOUSEPROPRIETARYCLASS2GINNASTEAMGENERATORTUBERUPTUREANALYSISISPERCENTTUBEPLUGGINGCASEI.I4E84.12Ei84RUPTUREDLOOP.1E~84888.INTACTLOOPOCC)ill688.488.288.8..IE~84.2E84.3E~84.4E~84TINE(SEC)FigureII.3SecondaryPressure-Case11074v:1D/11208l20 MESTINGHOUSEPROPRIETARYCLASS2GINNASTEAi1GENERATORTUBERUPTUREANALYSISPERCENTTUBEPLUGGINGCASE1658.688.~558.4JCD588.~458.IX488.C)358.CDCD~388.258~288'..1E~84..2E~84TI11E(SEC).3E~84~4E~84FigureII.4IntactLoopHotandColdLegRCSTemperatures-Case11074v:10/11208721 MESTINGHOUSEPROPRIETARYCLASS2GINNASTEAI1GENERATORTUBERUPTUREANALYSIS15PERCENTTUBEPLUGGINGCASE1168.I48.128'SSUEUlKlD88.C)68~hCEZIIJm48.28.-28...IE~84.2E~84TIt1EISEC).3E84.4E+84FigureII.5PrimarytoSecondaryLeakage-Case11074v:1D/11208722 MESTINGHOUSEPROPRIETARYCLASS2GINNASTEAI1GENERATORTUBERUPTUREANALYSIS15PERCENTTUBEPLUGGINGCASE1.6E84.SE84~.4E~84~.3'40.2Ei84.1E84.lE.84.2E~B4.3E~84.4E~84TlNEtSEC)FigureII.SRupturedSGRaterVolume-Case11074v:1D/11208123 WESTINGHOUSEPROPRIETARYCLASS2E.TransientDescrition-Case2[Case2addressesaSGTRinwhichthesinglefailureassumedisthatthefaultedsteamgeneratorPORVfailsopenatthetimethefaultedsteamgeneratorisisolated.]'hus,theCase2transientissimilartotheCase1transientuntilthattime..ThesequenceofeventsforCase2isIpresentedinTableII.4.FollowingthetuberupturetheRCSpressuredecreasesasshowninFigure11.7duetotheprimarytosecondaryleakage.Inresponsetothisdepressurization,thereactortripsonovertemperaturedelta-T.Afterreactortrip,corepowerrapidlydecreasestodecayheatlevelsandtheRCSdepressurizationbecomesmorerapid.Thesteamdumpsystemisinoperableduetotheassumedlossofoffsitepower,whichresultsinthesecondarypressurerisingtothesteamgeneratorPORVsetpointasshowninFigure11.8.ThedecreasingpressurizerpressureleadstoanautomaticSIsignalonlowpressurizerpressure.Pressurizerlevelalsodecreasesmorerapidlyfollowingreactortripuntiliteventuallyempties,asshowninFigure11.9.majorOperatorActions1.IdentifyandIsolatetheRupturedSteamGeneratorTherupturedsteamgeneratorisassumedtobeidentifiedandisolatedat[10minutesaftertheinitiationoftheSGTRorwhenthenarrowrangelevelreaches33%,whichevertimeisgreater.]'orthiscase,thetimetoreach[33/]'arrowrangelevelis[652]'econds,andthus,itwasassumedthattherupturedsteamgeneratorisisolatedatthattime.[TherupturedsteamgeneratorPORVisalsoassumedtofailopenatthistime.]'hefailurecausesthesteamgeneratortorapidlydepressurize,whichresultsinanincreaseinprimarytosecondaryleakage.Thedepressu'rizationoftherupturedsteamgeneratorincreases'hebreakflowandenergytransferfromprimarytosecondarywhichresultsinRCSpressureandtemperaturedecreasingmorerapidlythaninCase1.Therupturedsteamgenerator1074v:10/12048724 MESTINGHOUSEPROPRIETARYCLASS2depressurizationcausesacooldownintheintactsteamgeneratorloop.Asthe'ntactsteamgeneratorhotlegtemperaturedecreasesbelowthesteamgeneratorwatertemperaturereverseheattransfertakesplaceasshowninFigureII.10.[ItisassumedthatthetimerequiredfortheoperatortoidentifythattherupturedsteamgeneratorPORVisopenandtoclosetheassociatedblockvalveis15minutes.Thus,at1558secondsthedepressurizationofrupturedsteamgeneratoristerminated.]',c2.CoolDowntheRCStoestablishSubcoolingMargin[AftertherupturedsteamgeneratorPORVblockvalveisclosed,'hereisa5minuteoperatoractiontimeimposedpriortoinitiationofcooldown.]'hedepressurizationoftherupturedsteamgeneratoraffectstheRCScooldowntargettemperaturesincethetemperatureisdependentuponthepressureintherupturedsteamgenerator.Since'ffsitepowerislosttheRCSiscooledbydumpingsteamtotheatmosphereusingtheintactsteamgeneratorPORV.ThecooldowniscontinueduntilRCSsubcoolingattherupturedsteamgeneratorpressureis20'Fplusanallowanceof17'Fforinstrumentuncertainty.HecauseofthelowerpressureintherupturedsteamgeneratortheassociatedtemperaturetheRCSmustbecooledtoisalsolower,whichhastheneteffectofextendingthetimeforcooldown.ForCase2cooldownbeginsat[1858]'econds'andiscompletedat[2852]'econds.ThereductionintheintactsteamgeneratorpressurerequiredtoaccomplishthecooldownisshowninFigureII.8,andtheeffectofthecooldownontheRCStemperatureisshowninFigureII.10.TheRCSpressurealsodecreasesduringthiscooldownprocessduetoshrinkageofthereactorcoolantasshowninFigureII.7.3.DepressurizetoRestoreInventoryAftertheRCScooldown,a[2]'inuteoperatoractiontimeisincludedpriortodepressurization.TheRCSisdepressurizedat[2974]'econdstoassureadequatecoolantinventorypriorto1074v:10/11248725 HESTINGHOUSEPROPRIETARYCLASS2terminatingSIflow,-HiththeRCPsstopped,normalpressurizersprayisnotavailableandthustheRCSisdepressurizedbyopeningapressurizerPORV.Thedepressurizationiscontinueduntilanyofthefollowingconditionsaresatisfied:RCSpressureislessthantherupturedsteamgeneratorpressureandpressurizerlevelisgreaterthan0%plusanallowanceof3%forpressurizerleveluncertainty,orpressurizerlevelisgreaterthan80%minusanallowanceof3%forpressurizerleveluncertainty,orRCSsubcoolingislessthanthe17'Fallowanceforsubcoolinguncertainty.TheRCSdepressurizationreducesthebreakflowasshowninFigureII.11andincreasesSIflowtorefillthepressurizer,asshowninFigure11.9.4.TerminateSItoStopPrimarytoSecondaryLeakage,ThepreviousactionsshouldhaveestablishedadequateRCSsubcooling,verifiedasecondarysideheatsink,andrestoredthereactorcoolantinventoryfollowinganSGTRtoensurethatSIflowisnolongerneeded.Nhentheseactionshavebeencompleted,theSIflowmustbestoppedtopreventrepressurizationoftheRCSandtoterminateprimarytosecondaryleakage.TheSIflowisterminatedwhentheRCSpressureincreases,'minimumAFHflowisavailableandatleastoneintactsteamgeneratorlevelisinthenarrowrange,RCSsubcoolingisgreaterthanthe17'Fallowanceforsubcoolinguncertainty,andthepressurizerlevelisgreaterthanthe3%allowanceforpressurizerleveluncertainty.ToassurethattheRCSpressureisincreasing,SIwasnotterminateduntiltheRCSpressureincreasedto50psiabovetherupturedsteamgeneratorpressure.Afterdepressurizationiscompleted,anoperatoractiontimeof[1]'inuteisimposedpriortoSItermination.FigureII.11showsthattheprimarytosecondaryleakagecontinuesaftertheSIflowisstoppeduntiltheRCSandrupturedsteamgeneratorpressureequalize.TherupturedsteamwatervolumeisshowninFigureII.12.ForCase2,therupturedsteamgeneratordoesnotoverfill.1074v:1D/112487 MESTINGHOUSEPROPRIETARYCLASS2TABLEII.4SEQUENCEOFEVENTSCASE2EVENTTIMEsecReactorTrip49.4RupturedSGIsolatedRupturedSGPORVFailsOpena.cRupturedSGBlockValveClosed1558IntactSGPORVOpenedIntactSGPORVClosed18582852PRZRPORVOpenedPRZRPORVClosed29743006SITerminated3066BreakFlowTerminated34381D74v:1O/11208727 WESTINGHOUSEPROPRIETARYCLASS2GINNASTEAt1GENERATORTUBERUPTURE4NAL'/SIS15PERCENTTUBEPLUGGING2588.2258.CASE2-2888.CCl758.1588.~1258.cnI888.758.588.258.8.8.588.1888.l588.2888'588.5888.5588."4888.TIME(SEC)FigureII.7RCSPressure-Case21074v:10/11208728 HESTINGHOUSEPROPRIETARYCLASS21488.GINNASTEAMGENERATORTUBERUPTUREANALYSIS15PERCENTTUBEPLUGGINGCASE21288.-l888.w888.688.w488,RUPTUREDLOOPINTACTLOOP288,8.588.1888.:l588.2888.2588.3888.3588.4888.TIME(SEC)FigureII.8SecondaryPressure-Case21074v:10/11208729 WESTINGHOUSEPROPRIETARYCLASS2G1NNASTEANGENERATORTUBERUPTUREANALYS1515PERCENTTUBEPLUGGING188.CASE298.e8.78.LJw68.'58.48~38.028.18.8.8.588.1888.1588.2888'588.3888.3588.4888.TINE(SEC)FigureII.9PressurizerLevel-Case.21074v:10/11ZOST30 MESTINGHOUSEPROPRIETARYCLASS2GINNASTEAMGENERATORTUBERUPTUREANALVSIS15PERCENTTUBEPLUGGING658.CASE2688.~558.O588.~z.458.o488.xIo358,388.TCOLDTHOTTHOT,TCOLDTHOTTCOLD258'88.8.588.1888.1588.2888.2588.3888.3588.4888.TIME(SEC)FigureII.10IntactLoopHotandColdLegRCSTemperatures-Case21074v:1D/11208731 MESTINGHOUSEPROPRIETARYCLASS2GINNASTEAMGENERATORTUBERUPTUREANALVSIS15PERCENTTUBEPLUGGINGCASE278.w68~58.o48.38.oc28.I8,-18.-288.588.1888.1588.2888.2588.3888.3588.4888.TIME(SEC)FigureII.11PrimarytoSecondaryLeakage-Case21074v:1D/11208732 MESTINGHOUSEPROPRIETARYCLASS26888.GINNASTEAMGENERATORTUBERUPTUREANALYSIS15PERCENTTUBEPLUGGING'ASE2H)I~5888.Ko4888.~5888.~g2888~I888.8.588.1888.1588.2888.2588.5888.5588.4888.,TIME(SEC)Figure11,12RupturedSGMaterVolume-Case21074v:1D/11208733 WESTINGHOUSEPROPRIETARYCLASS2F.MassReleasesThemassreleasesweredeterminedforeachofthesinglefailurecasesforuseinevaluatingtheexclusionareaboundaryandlowpopulationzoneradiationexposure.Thesteamreleasesfromtherupturedandintactsteamgenerators,thefeedwaterflowstotherupturedandintactsteamgenerators,andprimarytosecondarybreakflowintotherupturedsteamgeneratorweredeterminedfortheperiodfromaccidentinitiationuntil2hoursaftertheaccidentandfrom2to8hoursaftertheaccident.Thereleasesfor0-2.hoursareusedtocalculatetheradiationdosesattheexclusionareaboundaryfora2hourexposure,andthereleasesfor0-8hoursareusedtocalculatetheradiationdosesatthelowpopulationzoneforthedurationoftheaccident.IntheLOFTTR2analyses,theSGTRrecoveryactionsintheE-3guidelineweresimulateduntiltheterminationofprimarytosecondaryleakage.Aftertheprimarytosecondaryleakageisterminated,theoperatorswillcontinuetheSGTRrecoveryactionsintheE-3guidelinetopreparetheplantforcooldowntocoldshutdownconditions.TheseactionsincludeestablishingnormalChemicalandVolumeControlSystem(CVCS)operationtoprovidereactorcoolantinventorycontrolandaborationpath;restartingareac'torcoolantpump(RCP),ifnonearerunning,toensurehomogeneousRCSconditionsandtoprovidenormalpressurizerspray;orstoppingoneRCP,ifbotharerunning,tominimizetheheatinput'uringthesubsequentcooldown;andtheactionsnecessaryto'inimizethespreadofcontaminationonthesecondaryside.WhentheinstructionsprovidedinE-3arecompleted,theplantshouldbecooledanddepressurizedtocoldshutdownconditions.Therearethreealternatemeansofperformingthepost-SGTRcooldownprovidedintheWOGEmergencyResponseGuidelines.Theguidelinesare:ES-3.1,POST-SGTRCOOLDOWNUSINGBACKFILL;ES-3.2,POST-SGTRCOOLDOWNUSINGBLOWDOWN;andES-3.3,POST-SGTRCOOLDOWNUSINGSTEAMDUMP.Thepreferredmethodsareusingbackfillorblowdownsincethesemethodsminimizetheradioactivityreleasedtotheatmosphere.TheES-3.3guidelineusingsteamdumpprovidesthefastestmethodfor1074v:1D/11208734 WESTINGHOUSEPROPRIETARYCLASS2depressurizingtheRCSandrupturedsteamgenerator.Thismethodalsoresultsintheworstradiologicalreleases,especiallyifsteamdumptothecondenserisunavailable.Therefore,themethodusingsteamdumpwasselectedforevaluationofthelong-termmassreleasessincethisproducesconservativeresultsfortheoffsitedoseevaluation.Itisnotedthattheuseofthesteamdumpmethodwouldnotbepermittedifsteamgeneratoroverfilloccursandwaterentersthemainsteamlines.ThehighlevelactionsfortheES-3.3guidelinearediscussedbelow,1.PrepareforCooldowntoColdShutdownTheinitialstepstoprepareforcooldowntocoldshutdownareperformedintheE-3guidelinefollowingSItermination,andthesestepswillbecontinuedinES-3.3iftheyhavenotalreadybeencompleted.AfewadditionalstepsarealsoperformedinES-3.3prior.toinitiatingcooldown.Theseincludeisolatingthecoldleg.SIaccumulatorstopreventunnecessaryinjection,energizingpressurizerheatersasnecessarytosaturatethepressurizerwaterandtoprovideforbetterpressurecontrol,andassuringadequateshutdownmarginintheeventofpotentialborondilutionduetoin-leakagefromthe'rupturedsteamgenerator.2.CooldownRCStoResidualHeatRemoval(RHR)SystemTemperatureTheRCSiscooledbysteamingandfeedingtheintactsteamgeneratorsimilartoanormalcooldown.Sinceallimmediatesafetyconcernshavebeenresolved,thecooldownrateshouldbemaintainedlessthanthemaximumallowablerateof100'F/hr.ThepreferredmeansforcoolingtheRCSissteamdumptothecondensersincethisminimizestheradiologicalreleasesandconservesfeedwatersupply.ThePORVfortheintactsteamgeneratorcanalsobeusedifsteamdumptothecondenserisunavailable.WhentheRHRsystemoperatingtemperatureisreached,thecooldownisstoppeduntilRCSpressurecanalsobedecreased.Thisensuresthatpressure/temperaturelimitswillnotbeexceeded.1074v:1D/11208735 WESTINGHOUSEPROPRIETARYCLASS23.DepressurizeRCStoRHRSystemPressureWhenthecooldowntoRHRsystemtemperatureiscompleted,thepressureintherupturedsteamgeneratorisdecreasedbyreleasingsteamfromtherupturedsteamgenerator.Steamreleasetothecondenserispreferredsincethisminimizesradiologicalreleases.However,steamcanalsobereleasedtotheatmosphereusingthePORVontherupturedsteamgenerator.Anevaluationofthepotentialradiologicalconsequencesshouldbeperformedbeforereleasingsteamfromtherupturedsteamgeneratortotheatmosphere.Astherupturedsteamgeneratorpressureisreduced,theRCSpressureismaintainedequaltothepressureintherupturedsteamgeneratorinordertopreventin-leakageofsecondarysidewateroradditionalprimarytosecondaryleakage.NormalpressurizersprayisthepreferredmeansofRCSpressurecontrolsincethisconservescoolantinventory.Ifpressurizersprayisnotavailable,apressurizerPORVorauxiliaryspraycanbeusedtocontrolRCSpressure.Whenoverfilloftherupturedsteamgeneratoroccurs,aswithCase1,guidelineES-3.1POST-SGTRCOOLDOWNUSINGBACKFILLisassumedtobeused.ThehighlevelactionsforES-3.1aresimilartoES-3.3.However,themethodbywhichES-3.1instructstheoperatortodepressurizetherupturedsteamgeneratordiffersfromES-3.3.InGuidelineES-3.1theRCSisdepressurizedtopromotebackflowthroughthefailedtubewhichdepressurizestherupturedsteamgeneratorwithoutsteamreleasestotheatmosphere.4.CooldowntoColdShutdownWhenRCStemperatureandpressurehavebeenreducedtotheRHRsystemin-servicevalues,RHRsystemcoolingisinitiatedtocompletethecooldowntocoldshutdown.Whencoldshutdownconditionsareachieved,thepressurizercanbecooledtoterminatetheevent.1074v:1O/11208736 WESTINGHOUSEPROPRIETARYCLASS2F.1MethodologyforCalculationofMassReleasesTheoperatoractionsfortheSGTRrecoveryuptotheterminationofprimarytosecondaryleakagearesimulatedintheLOFTTR2analyses.Thus,thesteamreleasesfromtherupturedandintactsteamgenerators,thefeedwaterflowstotherupturedandintactsteamgenerators,andtheprimarytosecondaryleakageintotherupturedsteamgeneratorweredeterminedfromtheLOFTTR2resultsfortheperiodfromtheinitiationoftheaccidentuntiltheleakageisterminated.L2,CFollowingtheterminationofleakage,theoperatorsareassumedtocompletethestepsintheE-3andES-3.3orES-3.1guidelinestoprepareforcooldowntocoldshutdown.Thetimefromleakageterminationuntiltheinitiationofcooldownwasassumedtobe20minutes(seeReference2).Theassumedtimeof20minutestoinitiatethecooldownisconsideredtobeconservative,sincetheactualtimeisexpectedtobelongerforanactualeventbecauseanevaluationofthepotentialoffsiteradiationdoseswouldberequiredpriortousingthesteamdumpmethodforthepost-SGTRcooldown.ItwasassumedthattheRCSandintactsteamgeneratorconditionsaremaintainedstableduringthe20minuteperioduntilthecooldownisinitiated.ThePORVfortheintactsteamgeneratorwasthenassumedtobeusedtocooldowntheRCStotheRHRsystemoperatingtemperatureof332'F,atthemaximumallowablecooldownrateof100'F/hr..TheRCSandtheintactsteamgeneratortemperaturesat2hourswerethendeterminedusingtheRCSandintactsteamgeneratorparametersatthetimeofleakageterminationandtheRCScooldownrate.'hesteamreleasesandthefeedwaterflowsfortheintactsteamgeneratorfortheperiodfromleakageterminationuntil2hoursweredeterminedfromamassandenergybalanceusingthecalculatedRCSandintactsteamgeneratorconditionsatthetimeofleakageterminationandat2hours.ThecoredecayheatandtheheataddedfromtheoperationofoneRCPwereincludedintheenergybalanceforthistimeperiod.Sincetherupturedsteamgeneratorisisolated,nochangeintherupturedsteamgeneratorconditionsisassumedtooccuruntilsubsequentdepressurization.TheassumptionsofareasonablyshortpreparationtimeforcooldownandthemaximumcooldownrateresultinminimumRCSandsteamgeneratortemperaturesat2hours,andtherefore,aconservativeestimateofthesteamreleasedtotheatmosphereduringthefirst2hours.1074v:1D/11208737 HESTINGHOUSEPROPRIETARYCLASS2a,c'TheRCScooldownwasassumedtobecontinuedafter2hoursuntiltheRHRsystemin-servicetemperatureof332'Fisreached.DepressurizationoftherupturedsteamgeneratorwasthenassumedtobeperformedimmediatelyfollowingthecompletionoftheRCScooldown.TherupturedsteamgeneratorwasassumedtobedepressurizedtotheRHRin-servicepressureof343psiaviasteamreleasefromtherupturedsteamgeneratorPORV,sincethismaximizesthesteamreleasefromrupturedsteamgeneratortotheatmospherewhichisconservativefortheevaluationoftheoffsiteradiationdoses.TheRCSpressureisalsoassumedtobereducedconcurrentlyastherupturedsteamgeneratorisdepressurizedtominimizeflowbetweentheRCSandtherupturedsteamgenerator.ItisassumedthatthecontinuationoftheRCScooldownanddepressurizationtoRHRoperatingconditionsarecompletedwithin8hoursaftertheaccidentsincethereisampletimetocompletetheoperationsduringthistimeperiod.Thesteamreleasesandfeedwaterflowsfrom2to8hoursweredeterminedfortheintactsteamgeneratorfromamassandenergybalanceusingtheRCSandsteamgeneratorconditionsat2hoursandattheRHRsystemin-serviceconditions.ThecoredecayheatandtheheatadditionduetotheoperationofoneRCPwerealsoincludedintheenergybalanceforthistimeinterval.Thesteamreleasedfromtherupturedsteamgeneratorfrom2to8hourswasdetermined.based'namassandenergybalancefortherupturedsteamgeneratorusingtheconditionsatthetimeofleakageterminationandsaturatedconditionsattheRHRin-servicepressure.After8hours,itisassumedthatfurtherplantcooldowntocoldshutdownaswellaslong-termcoolingisprovidedbytheRHRsystem.Therefore,thesteam~releasestotheatmosphereareterminatedafterRHRin-serviceconditionsareassumedtobe.reachedat8hours.F.2HassReleaseResultsThemassreleasecalculationswereperformedforbothsinglefailurecasesusingthemethodologydiscussedabove.Forthetimeperiodfrominitiationoftheaccidentuntilleakagetermination,thereleasesweredeterminedfromtheLOFTTR2resultsfortwoseparateperiodsforuseinthedosecalculations.Thefirsttimeperiodconsideredisfromaccidentinitiationuntilreactortrip.Sincethecondenserisinserviceuntilreactortrip,anyradioactivity1074v:1D/11208738 WESTINGHOUSEPROPRIETARYCLASS2releasedtotheatmospherepriortoreactortripwillbethrough'hecondenserairejector.Afterreactortrip,'hereleasestotheatmosphereareassumedtobeviathesteamgeneratorPORVs.Themassreleasescalculatedfromthetimeofleakageterminationuntil2hoursandfrom2-8hoursarealsoassumedtobereleasedtotheatmosphereviathesteamgeneratorPORVs.ThemassreleasesfortheSGTRevent[assumingdelayeduseoftheintactsteamgeneratorPORV]'Case1)arepresentedinTableII.5.Theresultsindicatethatapproximately[21,990]'bmofsteamand[23,710]'bmofwaterisreleasedfromtherupturedsteamgeneratortotheatmosphereinthefirst2hours.Atotalof[129,300]'bmofprimarywateristransferredtothesecondarysideoftherupturedsteam.generatorbeforethebreakflowisterminated.ThemassreleasesfortheSGTReventassuming[failureandisolationoftherupturedsteamgeneratorPORV]'Case2)arepresentedinTableII.6.Theresultsindicatethatapproximately[62,480]'bmofsteamisreleasedtotheatmospherefromtherupturedsteamgeneratorwithinthefirst2hours.After2hours[33,300]'bmisreleasedtotheatmospherefromtherupturedsteamgenerator.Atotalof[172,800]'bmofprimarywateristransferredtothesecondarysideoftherupturedsteamgeneratorbeforebreakflowisterminated.1074v:1D/11208739 MESTINGHOUSEPROPRIETARYCLASS2TABLEII.5CASE1MASSRELEASES0-TRIPTOTALMASSFLOW(POUNDS)TIMEPERIODTRIPTMSEP-OVFILL-TTBRK-T2HRSTMSEPOVFILLTTBRKT2HRS'RHRFaultedSGCondenserAtmosphereFeedwater47,80000015,450654043,60030,50000023,710*'00PICIntactSGCondenserAtmosphere47,150Feedwater47,1500000014,73032,95013,450151,870505,50046,04029,61017,900158,700513,500BreakFlow421647,57453,71023,800TRIPTMSEPOVFILLTTBRKT2HRSTRHR=Timeofreactortrip=[50]'ec.=Timewhenwaterreachesthemoistureseparators=[1086]'ec.=Timewhensteamgeneratoroverfills=[2372]'ec.=Timewhenbreakflowisterminated=[3428]'ec.=Timeat2hours=7200sec.=TimetoreachRHRin-serviceconditions,8hours=28,800sec.*Ha'ter1074v:1D/1120Sl40 MESTINGHOUSEPROPRIETARYCLASS2TABLEII.6CASE2MASSRELEASES~TOTALMASSFLOM(POUNDS)TIMEPERIOD0-TRIPTRIPTMSEP"TTBRK-T2HRSTMSEPTTBRKT2HRSTRHRFaultedSGCondenserAtmosphereFeedwater46,8800062,09039042,74033,260033,300CL,CIntactSGCondenserAtmosphereFeedwater46,220000035,43018,450153,920457,00046,22097,78019,700160,300457,700BreakFlow4134132,66636,00000TRIP=TimeTMSEP=TimeTTBRK=TimeT2HRS=TimeTRHR=Timeofreactortrip=[49.4]'ec.whenwaterreachesthemoistureseparators=[2372]'ec.whenbreakflowisterminated=[3438]'ec.at2hours=7200sec.toreachRHRin-serviceconditions,8hours=28,800sec.1074v:1D/11208741 MESTINGHOUSEPROPRIETARYCLASS2TABLEII.7SUMMARIZEDMASSRELEASESTOTALMASSFLOM(POUNDS)CASE1CASE2FaultedSG0-TTBRKTTBRK-2HRS-2HRS8HRS0-TTBRK-2HRSTTBRK2HRS8HRSCondenser47,82046,880Atmosphere45,700*62,48033,300Feedwater74,10076,000IntactSGCondenser47,15046,2200Atmosphere61,130151,870505,500Feedwater122,800158,700513,50053,880153,920457,000163,700160,300.457,700BreakFlow129,3000172,800023,710ibmofthisiswater.1074v:10/1120S742 WESTINGHOUSEPROPRIETARYCLASS2III.RADIOLOGICALCONSEQUENCESANALYSISTheevaluationoftheradiologicalconsequencesofasteamgeneratortuberupture,assumesthatthereactorhasbeenoperatingattheproposedTechnicalSpecificationlimitforprimarycoolantactivityandattheexistingTechnicalSpecificationlimitforprimarytosecondaryleakageforsufficienttimetoestablishequilibriumconcentrationsofradionuclidesinthereactorcoolantandinthesecondarycoolant.Radionuclidesfromtheprimarycoolantenterthesteamgenerator,viatherupturedtube,andarereleasedtotheatmospherethroughthesteamgeneratorsafetyorpoweroperatedreliefvalvesandviathe4condenserairejector,exhaust.Thequantityofradioactivityreleasedtotheenvironment,duetoaSGTR,dependsuponprimaryandsecondarycoolantactivity,iodinespikingeffects,primarytosecondarybreakflow,breakflowflashingfractions,attenuationofiodinecarriedbytheflashedportionofthebreakflow,partitioningofiodinebetweentheliquidandsteamphases,themassoffluidreleasedfromthegeneratorandliquid-vaporpartitioningintheturbinecondenserhotwell.Alloftheseparameterswereconservativelyevaluatedforadesignbasisdoubleendedruptureofasingletube.A.'esinBasisAnalticalAssumtionsThemajor'assumptionsandparametersusedintheanalysisareitemizedinTable111.1.Thefollowingisadiscussionofthesourceterm.SourceTermCalculationsTheradionuclideconcentrationsintheprimaryandsecondarysystem,priortoandfollowingtheSGTRaredeterminedasfollows:a.Theiodineconcentrationsinthereactorcoolantwillbebaseduponpreaccidentandaccidentinitiatediodinespikes.1074v:1D/11208743 MESTINGHOUSEPROPRIETARYCLASS2AccidentInitiatedSpike-Theinitialprimarycoolantiodineconcentrationis1yCi/gmofDoseEquivalent(D.E.)I-131.FollowingtheprimarysystemdepressurizationassociatedwiththeSGTR,aniodinespikeisinitiatedintheprimarysystemwhichincreasestheiodinereleaseratefromthefueltothecoolanttoavalue500timesgreaterthanthereleaseratecorrespondingtotheinitialprimarysystemiodineconcentration.Thedurationofthespike,[3.31'ours,issufficienttoincreasetheinitialRCSI-131inventorybyafactorof[100]'ii.PreaccidentSpike-AreactortransienthasoccuredpriortotheSGTRandhasraisedtheprimarycoolantiodineconcentrationfrom1to60yCi/gramofD.E.I-131.b.Theinitialsecondarycoolantiodineconcentrationis0.1yCi/gramofD.E.I-131.c.Thechemicalformofiodineintheprimaryandsecondarycoolantisassumedtobeelemental.4DoseCalculationsThefollowingassumptionsandparameterswereusedtocalculatetheactivityreleasedtotheatmosphereandtheoffsitedosesfollowingaSGTR.1.ThemassofreactorcoolantdischargedintothesecondarysystemthroughtheruptureandthemassofsteamreleasedfromtheintactandrupturedsteamgeneratorstotheatmospherearepresentedinTableII.5andII.G.2.ThetimedependentfractionofruptureflowthatflashestosteamandisimmediatelyreleasedtotheenvironmentispresentedinFigureIII.1.3.Thetimedependentiodineremovalefficiencyforscrubbingofsteambubblesas'heyrisefromtheleaksite[(assumedtobeatthetopofthetubebundle)]'othewatersurfacewasalsodeterminedforeach,1074v:10/112087 MESTINGHOUSEPROPRIETARYCLASS2case.,Theiodineremovalefficiencyisdeterminedbythe.methodsuggestedbyPostmaandTam(Ref.6).TheiodineremovalefficienciesareshowninFigureIII.2.4.The0.2gpmprimarytosecondaryleakisassumedtobesplitevenlybetweenthesteamgenerators.5.Theiodinepartitionfactorbetweentheliquidandsteamoftherupturedandintactsteamgeneratorsisassumedtobe1DO.6.Nocredit'astakenforradioactivedecayduringreleaseandtransport,orforclouddepletionbygrounddepositionduringtransporttothesiteboundaryorouterboundaryofthelowpopulationzone.7.Short-termatmosphericdispersionfactors(x/gs)foraccidentanalysisandbreathingratesareprovidedinTableIII.4.ThebreathingrateswereobtainedfromNRCRegulatoryGuide1.4,(Ref.4).OffsiteThroidDoseCalculationModelOffsitethyroiddosesarecalculatedusingthe~uation:ThgtDCF,.g(IAR);.(BR).(x/()).]1Jwhere(IAR)..=integratedactivityofisotopeireleasedduring'the1Jtimeintervalj'nCi>>F*Nocreditistakenforclouddepletionbygrounddepositionorbyradioactivedecayduringtransporttotheexclusionareaboundaryortotheouterboundaryofthelow-populationzone.1074v:1D/11208745 WESTINGHOUSEPROPRIETARYCLASS2(BR)~breathingrateduringtimeinterval'inmeter/second(TableIII.4)(x/Q)=atmosphericdispersionfactorduringtimeintervaljJinsecond/meter(TableIII.4)(DCF).=thyroiddoseconversionfactorviainhalationfor1isotopeiinrem/Ci(TableIII.5)thyroiddoseviainhalationinremResultsThyroiddosesattheExclusionAreaBoundaryandLowPopulationZonearepresentedinTableIII.6.AlldosesarewellwithintheallowableguidelinesasspecifiedbyStandardReviewPlan15.6e3and10CFR100.1074v:1D/11248746 WESTINGHOUSEPROPRIETARYCLASS2TABLEIII.1PARAMETERSUSEDINEVALUATINGTHERADIOLOGICALCONSEQUENCESOFASTEAMGENERATORTUBERUPTUREI.SourceDataA.Corepowerlevel,MWt1520B.Totalsteamgeneratortubeleakage,priortoaccident,gpm0.2C.Reactorcoolantiodineactivity:1.AccidentInitiatedSpikeTheinitialRCiodineactivitiesbasedon1I>Ci/gramofD.E.I-131arepresentedinTableIII.3.TheiodineappearanceratesassumedfortheaccidentinitiatedspikearepresentedinTableIII.2.2,Pre-AccidentSpikePrimarycoolantiodineactivitiesbasedon60gCi/gramofD.E.I-131arepresentedinTableIII.3.,D.SecondarysysteminitialactivityDoseequivalentof0.1yCi/gmofI-131,presentedinTableIII.3.1074v:1D/11208747 HESTINGHOUSEPROPRIETARYCLASS2TABLEIII.l(Sheet2)E.Reactorcoolantmass,gramsF.Steamgeneratormass(each),grams1.27x103.39x10G.Offsitepow'erLostattimeofreactortripH.Primary-to-secondaryleakagedurationforintactSG,hrs.I.Speciesofiodine100percentelementalII.ActivityReleaseDataA.Faultedsteamgenerator1.Ruptureflow2.RuptureflowflashingfractionSeeTableII.5orII.GSeeFigureIII.13.IodinescrubbingplusmoistureseparatorremovalefficiencySeeFigureIII.24.Totalsteamrelease,lbsSeeTableII.5orII.G5.Iodinepartitionfactora.Priortooverfillb.Afteroverfill100-1.0-SeeFigureIII.36.Locationoftuberupture[TopofBundle]'074v:10/1120S748 MESTINGHOUSE.PROPRIETARYCLASS2TABLEIII.1(Sheet3)B.Intactsteamgenerator1.Primary-to-secondaryleakage,gpm0.12.Totalsteamrelease,lbsSeeTable11.5or11.63.Iodinepartitionfactor100C.Condenser1.Iodinepartitionfactor100D.AtmosphericOispersionFactorsSeeTableIII,41074v:lo/11208749 MESTINGHOUSEPROPRIETARYCLASS2TABLEIII.2IODINESPIKEAPPEARANCERATES(CURIES/SECOND)1-1323-133I"1340.942.221.743.071074v:1D/11208750 MESTINGHOUSEPROPRIETARYCLASS2TABLEIII.3IODINESPECIFICACTIVITIESIN(yCi/gm)THEPRIMARYANDSECONDARYCOOLANTBASEDON1,60AND0.1yCi/gramOFD.E.I-131Nuclide~Pit11~luCD/m60uCi/cDmSecondarCoolant0,1wCi/(1m0.7947.10.079I-1320.3520.70.0351.0160.70.1010.2012.20.020I-1350.7947.10.0791074v:1D/11208751 MESTINGHOUSEPROPRIETARYCLASS2TABLEIII.4ATMOSPHERICDISPERSIONFACTORSANDBREATHINGRATESTimeExclusionAreaBoundaryLowPopulation(hours)x/Q(Sec/m)3Zonex/Q(Sec/m)3BreathingRate(m/Sec)[4]0-22-84.8x103x103x103.47x103.47x101074v:1D/11208752 WESTINGHOUSEPROPRIETARYCLASS2TABLEIII.5THYROIDDOSECONVERSIONFACTORS(Rem/Curie)[51Nuclide~I-131I-1341.49x101.43x102.69x103.73x105.60x101074v:1D/11208753 NESTINGHOUSEPROPRIETARYCLASS2TABLEIII.6RESULTSOosesRemAllowableCase1Case2GuidelineValuel.AccidentInitiatedIodineSikeExclusionAreaBoundary(0-2hr.)Thyroid26.43.830LowPopulationZone(0-8hr.)Thyroid1.70.3302.Pre-AccidentIodineSikeExclusionAreaBoundary(0-2hr.)Thyroid102.122.1300,LowPopulationZone(0-8hr.)Thyroid6.41.4300~1074v:1D/11248754 WESTINGHOUSEPROPRIETARYCLASS2GINN4SGTRIS%TUBEPLUGGING-C4SER4OIOLOGIC4LCONSEOUENCESEV4LU4TIONBREAKFLOWFL4SNINGFR4CTION~ISCase1e.~It~Si,tt&~tt~S4,lt~SiTIICItttlGINN4SGTRISZTUBEPLUGGINGCASE2R4OIGLOOICALCONSEOUENCESEVALUATIONBREAKFLOWFLASHINGFR4CTION~ISCase2~ItH,tt14~StSI,ateiTletItttIFigureIII.1BreakFlowFlashingFraction1074v:1D/11208755 HESTINGHOUSEPROPRIETARYCLASS2GL,GCASE1o5~2081eeeTINE(SECONDS)1588288~5CASE24Z.(~2VM'I01088TINEISECONDSI1508288FigureIII.2SrubbingEfficiency1074v:1D/112087 WESTINGHOUSEPROPRIETARYCLASS2IE+2CASE11E+120~aC<LE+8ZIHE(HOURS)1.5JE+2CASE21E+120CC+IE+8TIHE(HOURS)FigureIII.3FaultedSGIodinePartitionFactors1074v:1D/11208757 WESTINGHOUSEPROPRIETARYCLASS2IV.CONCLUSIONThepotentialradiologicalconsequencesofasteamgeneratortubefailurewereevaluatedfortheR.E.GinnanuclearpowerplanttodemonstratethattheuseoftheStandardTechnicalSpecification(STS)primarycoolantactivitylimitof1yCi/gramofdoseequivalentI-131willresult.inoffsitedosesthatarewithintheappropriateguidelines,ThemassreleasesforadesignbasisdoubleendedruptureofasingletubewithalossofoffsitepowerwereconservativelycalculatedusingthecomputercodeLOFTTR2.Twocaseswereconsidered:[1)intactsteamgeneratorPORVfailsclosedandmustbelocally1opened,and2)rupturedsteamgeneratorPORVfailsopenandmustbelocallyisolated.]'heanalysisexplicitlymodeledthetimeneededforthe'peratorstoperformtherecoverystepsoutlinedinguidelineE-3ofRevision1oftheWestinghouseOwnersGroupEmergencyResponseGuidelines.TheresultingdosesattheexclusionareaboundaryandlowpopulationzonearewithintheallowableguidelinesasspecifiedbyStandardReviewPlan15.6.3andlOCFR100.Consequently,theSTSprimarycoolantactivitylimitissufficientlylowtoensurethattheradiologicalconsequencesofasteamgeneratortuberuptureattheR.E,Ginnaplantwillbewithintheguidelines.1074v:1D/11208758 HESTINGHOUSEPROPRIETARYCLASS2V.REFERENCES1.Lewis,Huang,Behnke,Fittante,Gelman,"SGTRAnalysisMethodologytoDeterminetheMargintoSteamGeneratorOverfill,"HCAP-10698-P-A,August1987.[PROPRIETARY'.Lewis,Huang,Rubin,"EvaluationofOffsiteRadiationDosesforaSteamGeneratorTubeRuptureAccident,"Supplement1toHCAP-10698-P-A,March1986.[PROPRIETARY]3.R.Elaisz,LetterfromRGEtoHestinghouseconcerningGinnaspecificoperatoractiontimesforSGTRanalysis,February7,1985.4.NRCRegulatoryGuide1.4,Rev.2,"AssumptionsUsedforEvaluatingthePotentialRadiologicalConsequencesofaLOCAforPressurizedHaterReactors",Jun'e1974.5.NRCRegulatoryGuide1.109,Rev.1,"CalculationofAnnualDosestoManFromRoutine,ReleasesofReactorEffluentsforthePurposeofEvaluatingCompliancewith10CFRPart50AppendixI",October1977.6.Postma,A.K.,Tam,P.S.,"IodineBehaviorinaPHRCoolingSystemFollowingaPostulatedSteamGeneratorTubeRupture",NUREG-0409.1074v:1D/12048759 IraV0;Jih}}
 
1~   One (1) submittal of  an Application for Amendment to Operating License and associated    safety evaluation.
2 ~   One (1) copy of an Application for Withholding, CAW-87-123, dated December      3,   1987,   accompanying    Affidavit, and Proprietary  Information  Notice 3 ~  One (1) copy of WCAP-11668, "LOFTTR2 Analysis of Potential Radiological Consequences Following a Steam Generator Tube Rupture at the R.E. Ginna Nuclear Plant", November 1987 (Proprietary).
4 ~  One (1) copy of WCAP-11678, "LOFTTR2 Analysis of Potential Radiological Consequences Following a Steam Generator Tube Rupture at, the R.E. Ginna Nuclear Plant", November 1987 (Non-Proprietary).
xc>>   Mr. Allen R. Johnson (Mail Stop 14Dl)
Project Directorate I-3 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475  Allendale  Road King of Prussia,   PA    19406 Ginna Senior Resident Inspector
 
WESTINGHOUSE PROPRIETARY CLASS 2 WCAP" 11668 74>5'9Q  V LOFTTR2 ANALYSIS OF POTENTIAL RADIOLOGICAL CONSEQUENCES  FOLLOWING A STEAM GENERATOR TUBE RUPTURE AT THE R. E. GINNA NUCLEAR POWER PLANT
: 0. J. Mendler K. Rubin NOVEMBER 1987 Nuclear Safety Department This document contains information proprietary to Westinghouse Electric Corporation; it  is submitted in .confidence and is to be used solely for the purpose for which  it  is furnished and returned upon request. This document and such information is not to be reproduced, transmitted, disclosed or used otherwise in whole or in part without authorization of Westinghouse Electric Corporation, Nuclear Energy Systems.
Westinghouse  Electric Corporation Nuclear Energy Systems P.O. Box 355 Pittsburgh, Pennsylvania    15230 1987 by Westinghouse  Electric Corporation 1074v:1OP/120487
 
I P.
'\
1 0
 
WESTINGHOUSE PROPRIETARY CLASS 2 This document contains material that is proprietary to the Westinghouse Electric Corporation. This propr'ietary information has been marked by means of brackets. The basis for marking the material proprietary is identified by marginal notes referring to the standards in Section 8 of the affidavit of R. A. Wiesemann of record "In the Hatter of Acceptance Criteria for Emergency    .
Core Cooling Systems  for Light Water Cooled Nuclear Power Reactors (Docket No.
RH-50-1)" at teanscript pages 3706 through 3710 (February 24, 1972).
Due  to the proprietary nature of the material contained in this report which was obtained at considerable Westinghouse expense and the release of which would seriously affect our competitive position, we request this information to be withheld from public disclosure in accordance with the Rules of Practice, 10 CFR 2.790, and that the information presented therein be safeguarded in accordance with 10 CFR 2.903. We believe that withholding this information will not adversely affect the public interest.
This information is for your internal use only and should not be released to persons or organizations outside the directorate of Regulation and the ACRS without prior approval of Westinghouse Electric Corporation. Should 1
it become necessary to release this information to such persons as part of the review procedure, please contact Westinghouse Electric Corporation and they will make the necessary arrangements required to protect their proprietary'nterests.
1D74v:1D/7120B7
 
WESTINGHOUSE PROPRIETARY CLASS 2 TABLE OF CONTENTS Pacaes I.     INTRODUCTION II. THERHAL HYDRAULIC ANALYSIS A.     Design Basis Accident                            2 B.       Conservative Assumptions                        3 C.     Operator Action Times                            6 D.     Transient Description -  Case 1                13 E.       Transient Description -  Case 2                24 F.       Hass Releases                                  34 I I I. RADIOLOGICAL CONSEQUENCES ANALYSIS                      43 IV. CONCLUSION                                              58 V.     REFERENCES                                              59 1074v:1D/112087
 
0 0-
 
WESTINGHOUSE PROPRIETARY CLASS 2 I. INTRODUCTION An  evaluation of the potential radiological consequences due to a steam generator tube rupture (SGTR) event has been performed for the R. E. Ginna nuclear power plant to demonstrate that the offsite radiation doses will be less than the allowable guidelines based on the Standard Technical Specification limit on primary coolant activity. The evaluation discussed herein assumes that 151. of the steam generator tubes are plugged.
A  design basis steam generator tube rupture was analyzed for Ginna using the methodology developed in MCAP-10698 (reference 1) and the supplement to HCAP-10698 (reference 2). Two single failure cases were considered to determine which is the most limiting single failure for Ginna with respect to radiological. consequences.       The two cases examined were:
a,c Case 1    Intact  steam generator power operated  relief valve (PORV) fails closed and must be locally opened.
Case 2    Ruptured steam generator power operated  relief valve fails  open and must be  locally isolated.
Plant response to the event was modeled using the LOFTTR2 computer code with conservative assumptions of break size and location, condenser availability and initial secondary water mass in the faulted steam generator.         The analysis methodology includes the simulation of the operator actions for recovery from' steam generator tube rupture based on the Westinghouse Owners Group Emergency Response Guidelines, which are the basis for the Ginna Emergency Operating Procedures.         The mass releases were calculated with the LOFTTR2
~
program from the initiation of the event until termination of the break flow.
For the time period following break flow termination, steam releases and feedwater flows from the intact and faulted steam generators were determined from a mass and energy balance using the calculated RCS and steam generator conditions at the time of leakage termination. The mass releases for both cases were used to determine the radiation doses at the exclusion area boundary and low population zone assuming that the primary coolant activity 'is at the Standard Technical Specification limit prior to the accident.
1074v:1D/112087
 
MESTINGHOUSE PROPRIETARY CLASS 2 II. THERMAL HYDRAULIC ANALYSIS Integrated mass releases to the atmosphere and condenser during a steam generator tube rupture event were calculated for various time periods during the accident. This section includes the methods and assumptions used to model the SGTR event and calculate the mass releases, as well as the sequence of events for the recovery.
A. Desi    n Basis Accident The  accident modeled is the complete severance of a steam generator tube located at the tube sheet on the cold leg side. It was also assumed that loss of offsite power occurred at the time of reactor trip, and the worst rod was assumed to be stuck at reactor trip.
a,c The most    limiting single failure with respect to steam generator overfill was determined by reference 1 to be a failed closed PORV on the intact steam generator.     Since Ginna is a two loop plant, the intact steam generator PORV must be locally opened before RCS cooldown can begin. This additional time to locally open the intact steam generator PORV will delay RCS depressurization,       causing an increase in total primary to secondary leakage. Consequently,   more water  will accumulate in the  faulted            steam generator.     The case where    the intact steam generator  PORV  fails            to open on demand and must be      locally  opened will be referred to  as Case 1.
The most    limiting single failure with respect to offsite doses was determined by reference 2 to be a failed open PORV on the faulte'd steam generator. Failure of this PORV will cause an uncontrolled depressurization of the faulted steam generator which will increase primary to secondary leakage. Pressure in the ruptured steam generator will remain below that in the primary system until the failed PORV can be isolated, and recovery actions completed. The case where the          faulted'team generator PORV fails open and must be locally isolated will be referred to as Case 2.
1074v:1D/112087
 
WESTINGHOUSE PROPRIETARY CLASS 2 B. Conservative    Assum  tions Plant responses and mass releases from the intact and faulted steam generator prior to break flow termination were calculated using LOFTTR2.
While modeling the SGTR event the following assumptions were made:
: 1. Reactor Tri on Overtem erature Delta-T a,c A  turbine runback    can be initiated automatically or  the operator can manually reduce the turbine load to attempt to prevent a reactor trip on overtemperature delta-T.       Although turbine runback is simulated in this analysis, credit is.not taken for delaying reactor trip. Reactor trip is assumed to occur on overtemperature delta-T. Due to the assumed loss of offsite power the condenser is not available for steam releases once the reactor is tripped. Consequently, after reactor trip the steam generator PORYs are used for steam releases. Thus an earlier trip time leads to more steam released to the atmosphere from the faulted and intact steam generators.
: 2. Power a
The  initial  steam generator water mass decreases  with increasing power level.,   Thus, a lower initial power results in a higher initial steam generator secondary water mass which is conservative. On this basis, 100%   nominal power was assumed for the analysis rather than considering an overpower factor.
: 3. Pressurizer    Water Level a,c The RCS  depressurization rate increases after the pressurizer empties. A higher pressurizer water level will increase the time required for the pressurizer to empty. This results in maintaining a higher primary to secondary pressure differential and thus a larger break flow rate for a longer time period. Therefore,         it is concluded that maximizing the pressurizer water level is conservative.
1 074 v:1D/112087
 
HESTINGHOUSE PROPRIETARY CLASS 2
: 4. Steam Generator Seoond~ar  Mass a,c A  higher initial secondary water mass in the ruptured steam generator was determined by Reference 1 to be conservative for overfill. For the Case 1 analysis turbine runback was assumed initiated and was simulated by artificially increasing initial steam generator water mass. The initial steam generator total fluid mass was assumed to be lOA above nominal value plus the differential mass between 100% power and 70&#xc3; power to simulate turbine runback. However,   if steam generator overfill does not occur, a lower initial mass in the ruptur'ed steam generator results in a conservative prediction of offsite doses. .Thus, for Case 2 the initial secondary mass was assumed to correspond to operation at 10K below nominal steam generator water mass.
: 5. Break Location 4i, C The tube  rupture analyzed is a double-ended break of one steam generator tube located at the top of the tube sheet on the outlet side of the steam generator. The location of the break on the cold side of the steam generator results in higher primary to secondary leakage than a break on the hot side of the steam generator as determined by reference 1. Therefore,   it is concluded that the cold leg side break location is conservative.
: 6. Reactor  Tri  Oela a,c.
As noted  previously, the results for cases which produce an earlier reactor trip are more conservative with respect to the radiological consequences from a SGTR. Thus, a minimum delay time from the reactor trip signal to reactor trip is conservative for the analysis. In addition, as noted above, no credit is taken for turbine runback delaying reactor trip.
1074v:10/112387
 
ttESTINGHOUSE PROPRIETARY CLASS 2
: 7. T~ti      Ti  D1 a,c Following  a reactor trip, the turbine will be automatically tripped after a suitable delay time. Minimizing the delay time between reactor trip and turbine trip reduces the amount of steam flow to the turbine and increases the. secondary water inventory. Thus, a minimum delay time between reactor trip and turbine trip is conservative for the SGTR analysis.
: 8. Steam Generator  Relief Valve Pressure Set oint Hith a loss of offsite power, the secondary pressure will increase following reactor and turbine trip, and steam will be relieved through the steam generator PORVs and safety valves. A lower steam generator relief valve pressure setpoint leads to a higher primary to secondary pressure differential and thus higher primary to secondary leakage.
Thus, the use of the lowest setpoint for the steam generator. relief valves is conservative for the analysis. Since the PORV setpoint is lower than .the safety valve setpoints, the use of the PORV setpoint of 1050 psig for steam relief is more conservative,
: 9. Pressurizer Pressure for SI    Initiation a,c The use  of the maximum pressurizer pressure setpoint for SI initiation results in earlier actuation of the SI system. This leads to the maintenance of a higher primary to secondary pressure differential and consequently a higher break flow rate for a longer time period. Thus, the use of the maximum pressurizer pressure setpoint for SI initiation
          .in the analysis is conservative.
: 10. Leaka e  after Overfill a,c Overfill is assumed to occur if the ruptured steam generator  becomes water solid. No credit is taken for steam line volume.
1074v:10/1 12087
 
WESTINGHOUSE PROPRIETARY CLASS 2
: 11. Flashin    Fraction a,c When  calculating the amount of break flow that flashes to steam, 100 percent of the break flow is assumed to come from the hot leg side of the break. Since the tube rupture flow actually consists of flow from the hot leg and cold leg sides of the steam generator, the temperature of the combined flow will be less than the hot leg temperature and the flashing fraction will be correspondingly lower. Thus the assumption that 100 percent of the break flow comes from the hot leg is conservative for a SGTR analysis.
C.     erator Action  Times In the event of an SGTR, the operator is required to take actions to stabilize the plant and terminate the primary to secondary leakage. An evaluation has been performed (reference 1) to establish the operator action times for'use in the analysis of a design basis SGTR event. The operator actions which are required for recovery from an SGTR and the available data on the times to perform these actions have b'een reviewed.
The available data on operator action times for an SGTR includes information which has been obtained from reactor plant simulator studies as well as plant data from five actual SGTR events.       Using this data, operator -action times have been established. which are considered to be appropriate for a design basis SGTR event. These operator action times were be used as input for the analysis of the design basis SGTR event.
The major operator    actions for  SGTR recovery which are included in the E-3 guideline of the Westinghouse Owners Group Emergency Response Guidelines were explicitly modeled in the analysis.       The operator actions modeled include identification and isolation of the ruptured steam generator, cooldown and depressurization of the RCS to restore inventory, and termination of SI to stop primary to secondary leakage. These operator actions are described below.
1074v:1D/112087
 
MESTINGHOUSE PROPRIETARY CLASS 2
: 1. I.dentify the ruptured steam generator (step 2).
High secondary side    activity, as indicated by the steam generator blowdown line radiation monitor or air ejector radiation monitor, typically will provide the first indication of an SBTR event. The ruptured steam generator can be identified by high activity in the corresponding steam generator blowdown line, main steamline, or water sample. For an SBTR that results in a high power reactor trip, the steam generator water level will decrease off-scale on the narrow range for both steam generators. The auxiliary feedwater (AFM) flow will begin to refill the steam generators, typically distributing approximately equal flow to both steam generators.     Since primary to secondary leakage adds additional inventory which accumulates in the ruptured steam generator, level will return to the narrow range in that steam generator significantly earlier and will continue to increase more rapidly. This response provides confirmation of .an SGTR event and also identifies the ruptured steam generator.
: 2. Isolate the ruptured steam generator from the intact steam generator and isolate feedwater to the ruptured steam generator.(steps 3 and 4).
Once a  tube rupture has been identified, recovery actions begin by isolating steam flow from and stopping feedwater flow to the ruptured steam generator. In addition to minimizing radiological releases, this also reduces the possibility of filling the ruptured steam generator with water by 1) minimizing the accumulation of feedwater flow  and 2) enabling the operator to establish a pressure differential between the ruptured and intact steam generators as a necessary step toward terminating pr imary to secondary leakage. In the guideline for steam generator tube rupture recovery in the ERGs, the operator is directed to maintain the level in the ruptured steam generator between just on span and 50% on the narrow range instrument. Reference 1 assumed that the ruptured steam generator would be isolated when level in the steam generator reached [midway between these points]
                                                                    '074v:1D/112487
 
WESTINGHOUSE PROPRIETARY CLASS 2
[(33% narrow range
                                'f level).]   'orfor level Ginna    it was also conservative isolation. The ruptured steam to use [33 percent]
generator was assumed to be isolated at [33 percent narrow range level or at 10 minutes, whichever was longer.]
Cool down the Reactor Coolant System (RCS) using        the intact steam generator (step 14).
After isolation of the ruptured steam generator, the RCS is cooled as rapidly as possible to less than saturation temperature corresponding to the ruptured steam generator pressure by dumping steam from only the intact steam generator . This ensures adequate subcooling in the.
RCS after depressurization    to the ruptured steam generator pressure in subsequent actions., With offsite power available, the normal steam dump system to the condenser will provide sufficient capacity to perform this cooldown rapidly'. If offsite power is lost, the RCS is cooled using the power-operated relief valve (PORV) on the intact steam generator since neither the steam dump valves nor the condenser would be available. It is noted that RCS pressure will decrease during the cooldown as shrinkage of the reactor coolant expands the steam bubble in the pressurizer.
: 4. Depressurize the  RCS  to restore reactor coolant inventory (steps          17 or 18).
When  the cooldown is completed, SI flow    will    increase  RCS  pressure until  break flow matches SI flow. Consequently,         SI'flow  must be terminated to stop primary to secondary leakage.         However, adequate reactor coolant inventory must    first be assured.     This includes both sufficient reactor coolant subcooling and pressurizer inventory to maintain a reliable pressurizer level indication after SI flow is stopped. Since leakage from the primary side will continue after SI flow is stopped until RCS and ruptured steam generator pressures equalize,   an "excess" amount of inventory is needed to ensure 1074v:10/112487
 
WESTINGHOUSE PROPRIETARY CLASS 2 pressurizer level remains    on span. The "excess" amount                        required depends  on RCS  pressure and reduces to zero when RCS pressure equals the pressure in the ruptured steam generator. To reduce break flow and establish sufficient pressurizer level, RCS pressure is decreased by opening the  pressurizer  PORV.
: 5. Terminate SI to stop primary to secondary leakage (steps 21-23).
The  previous actions will have established adequate RCS subcooling, secondary side heat sink; and reactor coolant inventory following an SGTR to ensure that SI flow is no longer needed.                             When these actions have been completed, SI flow must be stopped to of the RCS and to terminate primary to secondary prevent'epressurization leakage. Primary to secondary leakage will continue after SI flow is stopped until RCS pressure and ruptured steam generator pressures equalize. Charging flow, letdown, and pressurizer heaters will then be controlled to prevent repressurization of the RCS'nd reinitiation of leakage into the ruptured steam .generator.
Since these major recovery actions will be modelled in the SGTR analysis, it  is necessary to establish the times required to perform these actions.
Although the intermediate steps between the major actions will not be explicitly modelled,     it is also necessary to account for the time required to perform the steps,     It  is noted that the total time required to complete the recovery-operations consists of both operator action time and system, or plant, response time; For instance, the time for each of the major recovery operations (i.e., RCS cooldown, RCS depressurization,'tc.)
is primarily due to the time required for the system response, whereas the operator action time is reflected by the time required for the operator to perform the intermediate action steps.
    'The operator    action times to initiate RCS cooldown, RCS depressurization and safety injection termination were developed in reference 1 and are listed in Table II.1. In addition to the operator action times developed in reference 1, Rochester Gas and Electric supplied the operator action 1074v:1D/112087
 
MESTINGHOUSE PROPRIETARY CLASS 2 times associated with recovering from the single failures (Reference 3).
[These operator 'actions, which would occur outside the control room, include locally opening the intact steam generator PORV, locally closing the intact steam generator PORV block valve and locally closing the faulted steam generator PORV block valve.]   'he    times associated with performing these operator actions are listed in Table II.2.     [It  is noted that the 20 minutes to open the intact steam generator PORV consists of 10 minutes to identify and locate the valve and 10 minutes to linearly open the PORV. Due to limitations of LOFTTR2, the operator action to open the intact steam generator PORV was simulated as a step opening after a 15 minute delay, which results in an equivalent integrated steam flow through the PORV at the end of the 20 minute period.] '
074 v:i o/1 1 2087                        10
 
MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.1 OPERATOR ACTION TIMES FOR DESIGN BASIS SGTR ANALYSIS Action                                      Time  min Identify    and isolate ruptured  SG        Haximum  of 10 min or calculated time to reach 334 narrow range level in the ruptured SG Operator action time to    initiate cooldown Cooldown                                    Calculated time for  RCS  cooldown Operator action time to    initiate depressurization Depressurization                            Calculated time for    RCS depressurization Operator action time to    initiate SI termination SI termination and pressure                  Calculated time for SI termination equalization                                and equalization of RCS  and ruptured SG pressures 1074v:1D/112087
 
WESTINGHOUSE PROPRIETARY CLASS 2 TABLE  II.2 GINNA SPECIFIC OPERATOR ACTION TIMES Q,C Action                                                  Time  min Faulted Steam Generator PORV Block                          15 Valve Closing-Local Action Intact  Steam Generator  PORV Opening-Local                20 Action Intact  Steam Generator  PORV Block Valve Closing-Local Action 1074v:1D/112087                          12
 
PROPRIETARY CLASS 2 II'ESTINGHOUSE D. Transient Descri tion -       Case 1
[Case    1  addresses  a SGTR  in which the single failure assumed is that the intact steam generator PORV fails to open on demand and must be locally opened.]     'he      sequence, of events for Case 1 is presented in Table II.3.
Following the tube rupture, reactor coolant flows from the primary into the secondary side of the ruptured steam generator since the primary pressure is greater than the steam generator pressure.         In response to this loss of reactor coolant, pressurizer level decreases as shown in Figure II.1. The RCS pressure also decreases as shown in Figure II.2 as the steam bubble in the pressurizer expands. As the RCS pressure decreases due to the continued primary to secondary leakage, automatic reactor trip occurs on an overtemperature delta-T trip signal.
After reactor trip, core power rapidly decreases to decay heat levels.
The turbine stop valves close and steam flow to the turbine is terminated. The steam dump system is designed to actuate following reactor trip to limit the increase in secondary pressure, but the steam dump valves remain closed due to the loss of condenser vacuum resulting from the assumed loss of offsite power at the time of reactor trip. Thus, the energy transfer from the primary system causes the secondary side pressure to increase rapidly after 'reactor trip until the steam generator.
PORVs lift to dissipate the energy, as shown in Figure II.3.
The RCS    pressure decreases more rapidly after reactor trip as energy transfer to the secondary shrinks the reactor coolant and the leak flow continues to deplete primary inventory. The decrease in RCS inventory results in a low pressurizer pressure SI signal. Pressurizer level also decreases more rapidly following reactor trip and the pressurizer eventually empties as shown in Figure II.1. After the pressurizer empties, the RCS pressure rapidly decreases as shown in Figure II.2.
1074v:10/120487                              13
 
WESTINGHOUSE PROPRIETARY CLASS 2 Since offsite power is assumed lost at reactor-trip, the RCPs trip and a gradual transition to natural circulation flow occurs. Immediately following reactor trip the temperature rise across the core decreases as core power decays (see Figure 11.4), however, the temperature rise subsequently increases as natural circulation flow develops. The cold leg temperatures trend toward the steam generator temperature as the fluid residence time in the tube region increases.       The RCS temperatures continue to slowly decrease due to the continued addition of the auxiliary feedwater to the steam generators until operator actions are initiated to cool down the    RCS.
major Operator Actions
: 1. Identify  and  Isolate the Ruptured  Steam Generator Once a  tube rupture has been identified, recovery actions begin by isolating steam flow from the ruptured steam generator and .throttling the  auxiliary feedwater flow to the ruptured  steam generator.        As indicated previously, the ruptured steam generator is assumed to be identified and isolated when the narrow range level reaches [33%]
the ruptured steam generator or at [10] 'inutes after .
                                                                                      'n reach [33%]   's initiation of the SGTR, whichever is longer. For Ginna, the time to less than [10] 'inutes, thus the ruptured steam generator is assumed to be isolated at [10] 'inutes.
: 2. Cool down the    RCS  to Establish Subcooling Margin After isolation of the ruptured steam generator, there is      a  [5]
operator. action time imposed prior to initiating the cooldown. 'inute The actual delay time used in the analysis is 4 seconds longer because of the computer program requirements for simulating the operator actions. After this time, actions are taken to cool the RCS as rapidly as possible by dumping steam from the intact steam generators. Since offsite power is lost, the RCS is cooled by dumping steam to the atmosphere using the PORV on the intact steam generator.
[For Case 1, as previously noted, the intact steam generator]
                                                                          '074 v:1D/112487                              14
 
MESTINGHOUSE PROPRIETARY CLASS 2
[PORV  fails to open. For the analysis, it was        assumed that the valve was  fully opened after an additional period of      15 minutes  (see pg.
10). Thus  at  1804 seconds  the intact steam generator PORV is opened for RCS cooldown.]     'he      cooldown is continued unti 1 RCS subcooling at the ruptured steam generator pressure is 20'F plus an are satisfied    it  is assumed that  it close the intact steam generator PORV block valve.]         't allowance of 17'F for subcooling uncertainty. [When these conditions takes the operator five minutes to is noted that overfill of the ruptured steam generator occurs during this time period at '[2372] 'econds, as shown in Figure II.6. This cooldown ensures that there will be adequate subcooling in the RCS after the subsequent depressurization of the RCS to the ruptured steam generator pressure. The reduction in the intact steam generator pressure required to accomplish the cooldown is shown in Figure II.3, and the effect of the cooldown on the RCS temperature is shown in Figure II.4. The RCS pressure also decreases during this cooldown process due to shrinkage of the reactor coolant as shown in Figure II.2.
3,   Depressurize    RCS  to Restore Inventory After the  RCS  cooldown,   a [2] 'inute operator action time is included prior to depressurization.         The RCS is depressurized at 2688 seconds to assure adequate coolant inventory prior to terminating SI flow. Mith the RCPs stopped, normal pressurizer'pray is not available and thus the RCS is depressurized by opening a pressurizer PORV. The depressurization is continued until any of the following conditions are satisfied: RCS pressure is less than the ruptured steam generator pressure and pressurizer level is greater than 0% plus an allowance of 3% for pressurizer level uncertainty, or pressurizer, level is greater than 80% minus an allowance of 3% for pressurizer level uncertainty, or RCS subcooling is less than the 17'F allowance for subcooling uncertainty. The RCS depressurization reduces the break flow as shown in Figure II.5 and increases SI flow to refill the pressurizer, as shown in Figure II.1.
1074v:10/112487                                15
 
WESTINGHOUSE PROPRIETARY CLASS 2
: 4. Terminate SI to Stop Primary to Secondary Leakage The  previous actions should have established adequate RCS subcooling, verified a secondary side heat sink, and restored the reactor coolant inventory following a SGTR to ensure that SI flow is no longer needed. When these actions have been completed, the SI flow must be stopped to prevent repressurization of the RCS and to terminate primary to secondary leakage. The SI flow is terminated when the RCS pressure increases,,minimum AFW flow is available and at least one intact steam generator level is in the narrow range, RCS subcooling is greater than the 17'F allowance for subcooling uncertainty, and the pressurizer level is greater than the 3X allowance for pressurizer level uncertainty. To assure that the RCS pressure is increasing, SI was not terminated in the analysis until the RCS pressure increased to 50 psi above the ruptured steam generator pressure.
After depressurization is completed, an operator action time of
[1] 'inute is imposed prior to SI termination. The primary to secondary leakage continues after the SI flow is terminated until the RCS  and ruptured steam generators equalize. This occurs when'the intact steam generator PORV is locally opened to cooldown the RCS so that subcooling may be maintained. When the PORV is opened the increased energy transfer from primary to secondary depressurizes the RCS to the ruptured .steam generator pressure.
1074v:10/112087                            16
 
MESTINGHOUSE PROPRIETARY CLASS 2 TABLE  II.3 SEQUENCE OF EVENTS CASE 1 d., C EVENT                                                          Time sec Reactor Trip                                                  50 Ruptured. SG  Isolated                                      600 Intact    SG PORV    Opened                                    1804 Overfill    Ruptured    SG                                    2372 Intact    SG PORV    Isolated                                  2568 PRZR PORV Opened                                              2688 PRZR PORV    Closed                                          2738 SI Terminated                                                  2798 Intact  PORV    Opened                                      3288 Break Flow Terminated                                          3428 1074v:1D/112087                            17
 
WESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE    1 188.
88 ~
78.
68.
4J 68.
t4 48.
38.
18 ~
8.
: 8.   .1Ei84       .2E+84      .3Ei84   .4E~84 TINE (SEC)
Figure  II.1    Pressurizer Level - Case 1 1074v:1D/112087                              18
 
MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE    I
                  .25E+84
                .225Ei84
                    .2E 84
                .175E'84
                . 15E+84 Ld
            ~, 12SE LJ
                      ~ 84 Of
            ~o   .1E 84 Of 758.
588.
258.
                                . IE~84   .2E 84      .3E ~ 84    .4E 84 TIME (SEC)
Figure  II.2  RCS  Pressure    - Case 1 1 074 v:10/112087                              19
 
MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS IS PERCENT TUBE PLUGGING CASE  I
              .I4E    84
              . 12Ei84                                  RUPTURED LOOP
                . 1E ~ 84 888.                                      INTACT LOOP OC 688.
C) ill        488.
288.
8.
                                . IE ~ 84   .2E 84    .3E ~ 84     .4E ~ 84 TINE (SEC)
Figure  II.3  Secondary Pressure      - Case 1 1 074 v:1D/11208l                                20
 
MESTINGHOUSE PROPRIETARY CLASS 2 G INNA STEAi1 GENERATOR TUBE RUPTURE ANALYSIS PERCENT        TUBE PLUGGING CASE  1 658.
688.
          ~ 558.
4J CD 588.
          ~ 458.
I X
488.
C) 358.
CD CD
          ~ 388.
258 ~
288 '.       . 1E ~ 84   .   .2E ~ 84    .3E ~ 84     ~ 4E ~ 84 TI11E (SEC)
Figure    II.4 Intact    Loop Hot and Cold Leg        RCS Temperatures - Case 1 1074v:10/112087                                    21
 
MESTINGHOUSE PROPRIETARY CLASS 2 G    INNA STEAI1 GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE  1 168.
I48.'SSUE 128 Ul K
lD 88.
C) 68 ~
hC EZ IIJ m    48.
28.
              -28.                                                 .4E+84
                                ..IE~84       .2E ~ 84      .3E 84 TIt1E ISEC)
Figure  II.5  Primary to Secondary Leakage  - Case 1 1074v:1D/112087                                        22
 
MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAI1 GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE  1
              .6E 84
              .SE 84
          ~   .4E ~ 84
          ~ .3'4 0
              .2Ei84
              .1E 84
                                . lE. 84     .2E~B4       .3E~84   .4E~84 TlNE tSEC)
Figure II.S      Ruptured  SG  Rater Volume - Case 1 1074v:1D/112081                                    23
 
WESTINGHOUSE PROPRIETARY CLASS 2 E. Transient Descri tion -     Case 2
[Case 2 addresses a SGTR in which the single failure assumed is that the faulted steam generator PORV fails open at the time the faulted steam generator is isolated.]       'hus,     the Case    2 transient is similar to the Case  1  transient until that time.     .The  sequence of events for Case 2 is I
presented in Table II.4.
Following the tube rupture the RCS pressure decreases as shown in Figure 11.7 due to the primary to secondary leakage.            In response to this depressurization, the reactor trips on overtemperature delta-T. After reactor trip, core power rapidly decreases to decay heat levels and the RCS depressurization      becomes more rapid. The steam dump system is inoperable due to the assumed loss of offsite power, which results in the secondary pressure rising to the steam generator PORV setpoint as shown in Figure 11.8. The decreasing pressurizer pressure leads to an automatic SI signal on low pressurizer pressure. Pressurizer level also decreases more rapidly following reactor trip until        it  eventually empties, as shown in Figure 11.9.
major Operator Actions
: 1. Identify  and  Isolate the Ruptured    Steam Generator The  ruptured steam generator is assumed to be identified and isolated at [10 minutes after the initiation of the SGTR or when the narrow range level reaches 33%, whichever time is greater.]         'or    this case, the time to reach [33/] 'arrow range level is [652]
and thus,  it was assumed that the ruptured steam generator is
                                                                                'econds, isolated at that time. [The ruptured steam generator PORV is also assumed to fail open at this time.]       'he      failure causes the steam generator to rapidly depressurize, which results in an increase in primary to secondary leakage. The depressu'rization of the ruptured steam generator increases'he break flow and energy transfer from primary to secondary which results in RCS pressure and temperature decreasing more rapidly than in Case 1. The ruptured steam generator 1074v:10/120487                              24
 
MESTINGHOUSE PROPRIETARY CLASS 2 depressurization      causes  a cooldown in the intact  steam generator loop. As  the'ntact      steam generator hot leg temperature    decreases below the steam generator water temperature          reverse heat transfer takes place as shown in Figure II. 10.         [It is assumed that the time required for the operator to identify that the ruptured steam generator PORV is open and to close the associated block valve is 15 minutes. Thus, at 1558 seconds the depressurization of ruptured steam generator is terminated.] ',c
: 2. Cool Down the      RCS  to establish Subcooling Margin
[After the ruptured steam generator        PORV  block valve is closed,'here is a 5 minute operator action time        imposed prior to initiation of cooldown.]     'he        depressurization of the ruptured steam generator affects the RCS cooldown target temperature since the temperature is dependent upon the pressure in the ruptured steam generator.            Since
        'ffsite      power is lost the RCS is cooled by dumping steam to the atmosphere using the intact steam generator PORV. The cooldown is continued until RCS subcooling at the ruptured steam generator pressure is 20'F plus an allowance of 17'F for instrument uncertainty. Hecause of the lower pressure in the ruptured steam generator the associated temperature the RCS must be cooled to is also lower, which has the net effect of extending the time for cooldown.
For Case 2 cooldown begins at [1858] 'econds 'and is completed at
[2852] 'econds.
The  reduction in the intact steam generator pressure required to accomplish the cooldown is shown in Figure II.8, and the effect of the cooldown on the RCS temperature is shown in Figure II.10. The RCS pressure also decreases during this cooldown process due to shrinkage of the reactor coolant as shown in Figure II.7.
: 3. Depressurize    to Restore Inventory After the    RCS  cooldown,     a [2] 'inute    operator action time is included prior to depressurization.         The RCS is depressurized at
[2974]   'econds        to assure adequate coolant inventory prior to 1074v:10/112487                                  25
 
HESTINGHOUSE PROPRIETARY CLASS 2 terminating SI flow, -Hith the RCPs stopped, normal pressurizer spray is not available and thus the RCS is depressurized by opening a pressurizer PORV. The depressurization is continued until any of the following conditions are satisfied: RCS pressure is less than the ruptured steam generator pressure and pressurizer level is greater than 0% plus an allowance of 3% for pressurizer level uncertainty, or pressurizer level is greater than 80% minus an allowance of 3% for pressurizer level uncertainty, or RCS subcooling is less than the 17'F allowance for subcooling uncertainty. The RCS depressurization reduces the break flow as shown in Figure II.11 and increases SI flow to refill the pressurizer, as shown in Figure 11.9.
: 4. Terminate SI to Stop Primary to Secondary Leakage, The  previous actions should have established adequate RCS subcooling, verified a secondary side heat sink, and restored the reactor coolant inventory following an SGTR to ensure that SI flow is no longer needed. Nhen these actions have been completed, the SI flow must be stopped to prevent repressurization of the RCS and to terminate primary to secondary leakage. The SI flow is terminated when the RCS pressure increases,'minimum AFH flow is available and at least one intact steam generator level is in the narrow range, RCS subcooling is greater than the 17'F allowance for subcooling uncertainty, and the pressurizer level is greater than the 3% allowance for pressurizer level uncertainty. To assure that the RCS pressure is increasing, SI was not terminated until the RCS pressure increased to 50 psi above the ruptured steam generator pressure.
After depressurization is completed, an operator action time of
[1] 'inute is imposed prior to SI termination. Figure II.11 shows that the primary to secondary leakage continues after the SI flow is stopped until the RCS and ruptured steam generator pressure equalize. The ruptured steam water volume is shown in Figure II.12.
For Case 2, the ruptured steam generator does not    overfill.
1074v:1D/112487
 
MESTINGHOUSE PROPRIETARY CLASS 2 TABLE  II.4 SEQUENCE OF EVENTS CASE  2 EVENT                                                          TIME  sec Reactor Trip                                                    49.4 Ruptured    SG  Isolated a.c Ruptured    SG  PORV  Fails Open Ruptured    SG  Block Valve Closed                            1558 Intact  SG PORV    Opened                                    1858 Intact  SG PORV    Closed                                    2852 PRZR PORV Opened                                              2974 PRZR PORV    Closed                                            3006 SI Terminated                                                  3066 Break Flow Terminated                                          3438 1D74v:1O/112087                              27
 
WESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAt1 GENERATOR TUBE RUPTURE 4NAL'/SIS 15 PERCENT TUBE PLUGGING CASE 2 2588.
2258.
2888.
CC l758.
1588.
          ~ 1258.
cn I 888.
758.
588.
258.
8.
: 8. 588. 1888. l588. 2888 '588. 5888. 5588." 4888.
TIME(SEC)
Figure  II.7  RCS  Pressure  - Case 2 1074v:10/112087                                28
 
HESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE 2 1488.
RUPTURED LOOP 1288.
l888.
w  888.
688.
INTACT LOOP w  488, 288,
: 8. 588. 1888.:l588. 2888. 2588. 3888. 3588. 4888.
TIME(SEC)
Figure  II.8  Secondary Pressure  - Case 2 1074v:10/112087                              29
 
WESTINGHOUSE PROPRIETARY CLASS 2 G1NNA STEAN GENERATOR TUBE RUPTURE ANALYS15 15 PERCENT TUBE PLUGGING CASE 2 188.
98.
e8.
78.
LJ w  68.
              '58.
48 ~
38.
0 28.
18.
8.
: 8. 588. 1888. 1588. 2888 '588.     3888. 3588. 4888.
TINE ( SEC )
Figure  II.9    Pressurizer    Level  - Case.2 1074v:10/1 1ZOST                                30
 
MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALVSIS 15 PERCENT TUBE PLUGGING CASE 2 658.
688.                 THOT
          ~ 558.
O                                    , TCOLD THOT 588.           TCOLD
        ~z. 458.
ox 488.
I THOT                  TCOLD o 358, 388.
258
                '88.
: 8. 588. 1888. 1588. 2888. 2588. 3888. 3588. 4888.
T I ME ( SEC )
Figure        II.10 Intact  Loop Hot and Cold Leg    RCS Temperatures - Case 2 1074v:1D/1 12087                                        31
 
MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALVSIS 15 PERCENT TUBE PLUGGING CASE 2 78.
w 68 ~
58.
o 48.
38.
oc  28.
I8,
            -18.
            -28
: 8. 588. 1888. 1588. 2888. 2588. 3888. 3588. 4888.
TIME(SEC)
Figure II.11 Primary to Secondary Leakage      - Case 2 1074v:1D/112087                                32
 
MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING
                                                'ASE    2 6888.
H)
I
      ~ 5888.
K o 4888.
      ~ 5888.
      ~g 2888  ~
I888.
: 8. 588. 1888. 1588. 2888. 2588. 5888. 5588. 4888.,
T I ME ( SEC )
Mater Volume  Case Figure 11,12    Ruptured      SG                      2 1074v:1D/112087                                    33
 
WESTINGHOUSE PROPRIETARY CLASS 2 F. Mass Releases The mass    releases were determined for each of the single failure cases for use in evaluating the exclusion area boundary and low population zone radiation exposure. The steam releases from the ruptured and intact steam generators, the feedwater flows to the ruptured and intact steam generators, and primary to secondary break flow into the ruptured steam generator were determined for the period from accident initiation until 2 hours after the accident and from 2 to 8 hours after the accident. The releases for 0-2. hours are used to calculate the radiation doses at the exclusion area boundary for a 2 hour exposure, and the releases for 0-8 hours are used to calculate the radiation doses at the low population zone for the duration of the accident.
In the LOFTTR2 analyses, the SGTR recovery actions in the E-3 guideline were simulated until the termination of primary to secondary leakage.
After the primary to secondary leakage is terminated, the operators will continue the SGTR recovery actions in the E-3 guideline to prepare the plant for cooldown to cold shutdown conditions. These actions include establishing normal Chemical and Volume Control System (CVCS) operation to provide reactor coolant inventory control and a boration path; restarting a reac'tor coolant pump (RCP),     if none are running, to ensure homogeneous RCS conditions and to provide normal pressurizer spray; or stopping one RCP,   if  both are running, to minimize the heat input'uring the subsequent cooldown; and the actions necessary to'inimize the spread of contamination on the secondary side. When the instructions provided in E-3 are completed, the plant should be cooled and depressurized to cold shutdown conditions. There are three alternate means of performing the post-SGTR cooldown provided in the WOG Emergency Response Guidelines.         The guidelines are: ES-3.1, POST-SGTR COOLDOWN USING BACKFILL; ES-3.2, POST-SGTR COOLDOWN USING BLOWDOWN; and ES-3.3, POST-SGTR COOLDOWN USING STEAM DUMP.       The preferred methods are using backfill or blowdown since these methods minimize the radioactivity released to the atmosphere.       The ES-3.3 guideline using steam dump provides the fastest method for 1074v:1D/112087                            34
 
WESTINGHOUSE PROPRIETARY CLASS 2 depressurizing the RCS and ruptured steam generator. This method also results in the worst radiological releases, especially              if  steam dump to the condenser is unavailable. Therefore, the method using steam dump was selected for evaluation of the long-term mass releases since this produces conservative results for the offsite dose evaluation. It is noted that the use of the steam dump method would not be permitted                if  steam generator overfill occurs and water enters the main steamlines.
The high      level actions for the ES-3.3 guideline are discussed below,
: 1. Prepare  for  Cooldown  to Cold  Shutdown The  initial  steps to prepare for cooldown to cold shutdown are performed in the E-3 guideline following SI termination, and these steps will be continued in ES-3.3          if  they have not already been completed. A few additional steps are also performed in ES-3.3 prior
        . to initiating cooldown. These include isolating the cold leg. SI accumulators to prevent unnecessary injection, energizing pressurizer heaters as necessary to saturate the pressurizer water and to provide for better pressure control, and assuring adequate shutdown margin in the event of potential boron dilution due to in-leakage from the
          'ruptured    steam generator.
: 2. Cooldown  RCS  to Residual Heat  Removal    (RHR) System  Temperature The RCS  is cooled  by steaming and feeding the intact steam generator similar to a normal cooldown. Since all immediate safety concerns have been resolved, the cooldown rate should be maintained less than the maximum allowable rate of        100'F/hr. The preferred means for cooling the RCS is steam dump        to the condenser since this minimizes the radiological releases and        conserves feedwater supply.       The  PORV for the intact steam generator        can  also be used    if steam  dump  to the condenser is unavailable.       When  the  RHR  system operating temperature is reached, the cooldown    is  stopped    until  RCS pressure can also be decreased. This ensures  that pressure/temperature limits will not be exceeded.
1074v:1D/112087                                  35
 
WESTINGHOUSE PROPRIETARY CLASS 2
: 3. Depressurize    RCS  to  RHR System Pressure When  the cooldown to RHR system temperature is completed, the pressure in the ruptured steam generator is decreased by releasing steam from the ruptured steam generator. Steam release to the condenser is preferred since this minimizes radiological releases. However, steam can also be released to the atmosphere using the PORV on the ruptured steam generator.       An evaluation of the potential radiological consequences should be performed before releasing steam from the ruptured steam generator to the atmosphere. As the ruptured steam generator pressure is reduced, the RCS pressure is maintained equal to the pressure in the ruptured steam generator in order to prevent in-leakage of secondary side water or additional primary to secondary leakage. Normal pressurizer spray is the preferred means of RCS pressure control since this conserves coolant inventory.       If pressurizer spray is not available, a pressurizer PORV or auxiliary spray can be used to control RCS pressure.
When  overfill of    the ruptured steam generator occurs, as with Case 1, guideline ES-3.1    POST-SGTR COOLDOWN USING BACKFILL is assumed to  be used. The high  level actions for ES-3.1  are similar to ES-3.3.
However, the method by which ES-3.1 instructs the operator to depressurize the ruptured steam generator differs from ES-3.3. In Guideline ES-3.1 the RCS is depressurized to promote back flow through the failed tube which depressurizes the ruptured steam generator without steam releases to the atmosphere.
: 4. Cooldown  to Cold  Shutdown When RCS  temperature and pressure have been reduced to the RHR system in-service values, RHR system cooling is initiated to complete the cooldown to cold shutdown. When cold shutdown conditions are achieved, the pressurizer can be cooled to terminate the event.
1074v:1O/112087                              36
 
WESTINGHOUSE PROPRIETARY CLASS 2 F.1    Methodology for Calculation of  Mass Releases L2,C The  operator actions for the SGTR recovery up to the termination of primary to secondary leakage are simulated in the LOFTTR2 analyses.     Thus, the steam releases from the ruptured and intact steam generators, the feedwater flows to the ruptured and intact steam generators, and the primary to secondary leakage into the ruptured steam generator were determined from the LOFTTR2 results for the period from the initiation of the accident until the leakage is terminated.
Following the termination of leakage, the operators are assumed to complete the steps in the E-3 and ES-3.3 or ES-3.1 guidelines to prepare for cooldown to cold shutdown. The time from leakage termination until the initiation of cooldown was assumed to be 20 minutes (see Reference 2). The assumed time of 20 minutes to initiate the cooldown is considered to be conservative, since the actual time is expected to be longer for an actual event because an evaluation of the potential offsite radiation doses would be required prior to using the steam dump method for the post-SGTR cooldown. It was assumed that the RCS and intact steam generator conditions are maintained stable during the 20 minute period until the cooldown is initiated. The PORV for the intact steam generator was then assumed to be used to cool down the RCS to the RHR system operating temperature of 332'F, at the maximum allowable cooldown rate of 100'F/hr.. The RCS and the intact steam generator temperatures at 2 hours were then determined using the RCS and intact steam generator parameters at the time of leakage termination and the RCS cooldown rate.'he steam releases and the feedwater flows for the intact steam generator for the period from leakage termination until 2 hours were determined from a mass and energy balance using the calculated RCS and intact steam generator conditions at the time of leakage termination and at 2 hours. The core decay heat and the heat added from the operation of one RCP were included in the energy balance for this time period. Since the ruptured steam generator is isolated, no change in the ruptured steam generator conditions is assumed to occur until subsequent depressurization. The assumptions of a reasonably short preparation time for cooldown and the maximum cooldown rate result in minimum RCS and steam generator temperatures    at 2 hours, and therefore, a conservative estimate of the steam released to the atmosphere during the first 2 hours.
1074v:1D/112087                          37
 
HESTINGHOUSE PROPRIETARY CLASS 2 a,c
  'The  RCS  cooldown was assumed    to be continued after 2 hours until the RHR system in-service temperature of 332'F is reached.         Depressurization of the ruptured steam generator was then assumed to be performed immediately following the completion of the RCS cooldown. The ruptured steam generator was assumed to be depressurized to the RHR in-service pressure of 343 psia via steam release from the ruptured steam generator PORV, since this maximizes the steam release from ruptured steam generator to the atmosphere which is conservative for the evaluation of the offsite radiation doses. The RCS pressure is also assumed to be reduced concurrently as the ruptured steam generator is depressurized to minimize flow between the RCS and the ruptured steam generator.       It is assumed that the continuation of the RCS cooldown and depressurization to RHR operating conditions are completed within 8 hours after the accident since there is ample time to complete the operations during this time period. The steam releases and feedwater flows from 2 to 8 hours were determined      for the intact  steam generator from a mass and energy balance using the      RCS and steam generator    conditions at 2 hours and at the RHR system in-service conditions. The core decay heat and          the heat addition due to the operation of one RCP were also included in the energy balance for this time interval. The steam released from the ruptured steam generator from 2 to 8 hours was determined. based'n a mass and energy balance for the ruptured steam generator using the conditions at the time of leakage termination and saturated conditions at the RHR in-service pressure.
After    8  hours, it is assumed that further plant cooldown to cold shutdown as well as long-term cooling is provided by the RHR system. Therefore, the steam
~
releases to the atmosphere are terminated after RHR in-service conditions are assumed to be .reached at 8 hours.
F.2    Hass Release  Results The mass    release calculations were performed for both single failure cases using the methodology discussed above. For the time period from initiation of the accident until leakage termination, the releases were determined from the LOFTTR2 results for two separate periods for use in the dose calculations.
The first time period considered is from accident initiation until reactor trip. Since the condenser is in service until reactor trip, any radioactivity 1074v:1D/112087                              38
 
WESTINGHOUSE PROPRIETARY CLASS 2 released to the atmosphere      prior to reactor trip will be through'he        condenser air ejector. After reactor trip,'he          releases  to the atmosphere are assumed to be via the steam generator PORVs. The mass releases calculated from the time of leakage termination until 2 hours and from 2-8 hours are also assumed to be released to the atmosphere via the steam generator PORVs. The mass releases for the SGTR event [assuming delayed use of the intact steam generator PORV] 'Case 1) are presented in Table II.5. The results indicate that approximately [21,990]       'bm    of steam and [23,710]   'bm of water is released from the ruptured steam generator to the atmosphere in the first 2 hours. A total of [129,300]           'bm    of primary water is transferred to the secondary side of the ruptured steam. generator before the break flow is terminated.
The mass    releases for the SGTR event assuming [failure and isolation of the ruptured steam generator PORV] 'Case 2) are presented in Table II.6. The results indicate that approximately [62,480]         'bm    of steam is released to the atmosphere from the ruptured steam generator within the first 2 hours.
After 2 hours [33,300]     'bm    is released to the atmosphere from the ruptured steam generator. A total of [172,800]           'bm    of primary water is transferred to the secondary side of the ruptured steam generator before break flow is terminated.
1074v:1D/112087                              39
 
MESTINGHOUSE PROPRIETARY CLASS 2 TABLE  II.5 CASE 1 MASS RELEASES TOTAL MASS FLOW (POUNDS)
TIME PERIOD 0-TRIP      TRIP        TMSEP  - OVFILL -     TTBRK   -   T2HRS TMSEP      OVFILL  TTBRK        T2HRS      'RHR Faulted  SG                                                                              PIC Condenser        47,800        0            0      0              0 Atmosphere          0        15,450      6540    23,710*
Feedwater        43,600      30,500        0      0              0 Intact  SG Condenser        47,150          0          0      0              0          0 Atmosphere                    14,730      32,950  13,450        151,870      505,500 Feedwa  ter      47,150      46,040      29,610  17,900        158,700      513,500 Break Flow            4216        47,574      53,710  23,800 TRIP    =  Time of reactor  trip  =  [50] 'ec.
TMSEP    = Time when  water reaches the moisture separators      =   [1086]   'ec.
OVF ILL =   Time when  steam generator overfills = [2372]   'ec.
TTBRK    = Time when  break flow is terminated = [3428]     'ec.
T2HRS    = Time  at 2 hours = 7200 sec.
TRHR    = Time to reach RHR in-service conditions,     8 hours    =   28,800 sec.
*Ha'ter 1074v:1D/1120Sl                                40
 
MESTINGHOUSE PROPRIETARY CLASS 2 TABLE  II.6 CASE 2 MASS RELEASES
                                ~
TOTAL MASS FLOM (POUNDS)
TIME PERIOD 0-TRIP        TRIP        TMSEP  " TTBRK -     T2HRS TMSEP      TTBRK    T2HRS        TRHR CL, C Faulted    SG Condenser        46,880          0          0 Atmosphere                    62,090        390                  33,300 Feedwater        42,740      33,260        0 Intact  SG Condenser        46,220          0          0        0            0 Atmosphere                    35,430      18,450    153,920      457,000 Feedwater        46,220      97,780      19,700    160,300      457,700 Break Flow            4134        132,666    36,000      0            0 TRIP    =   Time of reactor  trip  = [49.4] 'ec.
TMSEP    =   Time when water reaches      the moisture separators  =  [2372] 'ec.
TTBRK    =  Time when  break flow is terminated = [3438]     'ec.
T2HRS    =  Time at 2 hours = 7200 sec.
TRHR      =  Time to reach RHR in-service conditions,       8 hours  = 28,800 sec.
1074v:1D/112087                                41
 
MESTINGHOUSE PROPRIETARY CLASS 2 TABLE  II.7 SUMMARIZED MASS RELEASES TOTAL MASS FLOM (POUNDS)
CASE 1                        CASE 2 0-         TTBRK -   2HRS-         0 -   TTBRK -   2HRS TTBRK        2HRS    8HRS        TTBRK  2HRS      8HRS Faulted    SG Condenser    47,820                              46,880 Atmosphere    45,700*                             62,480            33,300 Feedwater    74,100                              76,000 Intact    SG Condenser    47,150                              46,220    0 Atmosphere    61,130      151,870  505,500      53,880  153,920    457,000 Feedwater    122,800      158,700  513,500      163,700 160,300 . 457,700 Break Flow        129,300        0                  172,800  0 23,710 ibm of  this is water.
1074v:10/1120S7                          42
 
WESTINGHOUSE PROPRIETARY CLASS 2 II I. RADIOLOGICAL CONSEQUENCES ANALYSIS The  evaluation of the radiological consequences of a steam generator tube rupture, assumes that the reactor has been operating at the proposed Technical Specification limit for primary coolant activity and at the existing Technical Specification limit for primary to secondary leakage for sufficient time to establish equilibrium concentrations of radionuclides in the reactor coolant and in the secondary coolant.       Radionuclides from the primary coolant enter the steam generator, via the ruptured tube, and are released to the atmosphere through the steam generator safety or power operated relief valves and via the 4
condenser air ejector, exhaust.
The  quantity of radioactivity released to the environment, due to a SGTR, depends upon primary and secondary coolant activity, iodine spiking effects, primary to secondary break flow, break flow flashing fractions, attenuation of iodine carried by the flashed portion of the break flow, partitioning of iodine between the liquid and steam phases, the mass of fluid released from the generator and liquid-vapor partitioning in the turbine condenser hot well. All of these parameters were conservatively evaluated for a design basis double ended rupture of a single tube.
A.'esi      n  Basis Anal tical Assum tions The  major'assumptions and parameters used in the analysis are itemized in Table 111.1. The following is a discussion of the source term.
Source Term Calculations The  radionuclide concentrations in the primary and secondary system, prior to and  following the SGTR are determined as follows:
: a. The  iodine concentrations in the reactor coolant  will be based upon preaccident and accident initiated iodine spikes.
1074v:1D/112087                            43
 
MESTINGHOUSE PROPRIETARY CLASS 2 Accident Initiated Spike - The initial primary coolant iodine concentration is 1 yCi/gm of Dose Equivalent (D.E.) I-131.
Following the primary system depressurization associated with the SGTR, an iodine spike is initiated in the primary system which increases the iodine release rate from the fuel to the coolant to a value 500 times greater than the release rate corresponding to the initial primary system iodine concentration. The duration of the spike, [3.31   'ours,     is sufficient to increase the initial RCS I-131 inventory by a factor of [100] '
ii.     Preaccident Spike - A reactor transient has occured prior to the SGTR and has raised the primary coolant iodine concentration from 1 to 60 yCi/gram of D.E. I-131.
: b. The    initial  secondary coolant iodine concentration    is 0.1 yCi/gram of D.E. I-131.
: c. The chemical form      of iodine in the primary    and secondary  coolant is assumed      to be elemental.
4 Dose    Calculations The    following assumptions        and parameters  were used to  calculate the activity released to the atmosphere and            the offsite doses following a SGTR.
: 1. The mass      of reactor coolant discharged into the secondary system through the rupture and the mass of steam released from the intact and ruptured steam generators to the atmosphere are presented in Table II.5 and II.G.
: 2. The time dependent        fraction of rupture flow that flashes to steam and is immediately released to the environment is presented in Figure III.1.
: 3. The time dependent        iodine removal efficiency for scrubbing of steam bubbles as'hey rise from the leak site [(assumed to be at the top of the tube bundle)]       'o    the water surface was also determined for each
,1 074v: 1 0/112087
 
MESTINGHOUSE PROPRIETARY CLASS 2 case.,     The  iodine removal efficiency is determined by the. method suggested by Postma      and Tam (Ref. 6). The iodine removal efficiencies are shown in Figure    III.2.
: 4. The  0.2  gpm  primary to secondary leak is assumed to be        split  evenly between the steam generators.
: 5. The  iodine partition factor between the liquid and steam of the ruptured and intact steam generators is assumed to be 1DO.
: 6. No  credit'as      taken  for radioactive    decay during release and    transport, or for cloud depletion        by ground deposition during transport      to the site boundary or outer boundary of the low population zone.
: 7. Short-term atmospheric dispersion factors (x/gs) for accident analysis and breathing rates are provided in Table III.4. The breathing rates were obtained from NRC Regulatory Guide 1.4, (Ref. 4).
Offsite    Th  roid  Dose  Calculation  Model Offsite thyroid        doses are  calculated using the ~uation:
Th                  gtDCF,.
1 gJ
( IAR); . (BR) . (x/()) .
                                                                            ]
where
( IAR)..       =   integrated activity of isotope    i released during'the 1J time interval  j'n Ci>>
F
* No  credit is taken for cloud depletion by ground deposition or by radioactive decay during transport to the exclusion area boundary or to the outer boundary of the low-population zone.
1074v:1D/112087                                  45
 
WESTINGHOUSE PROPRIETARY CLASS 2 (BR) ~     breathing rate during time interval'   in meter /second (Table  III.4)
(x/Q)
J
                    = atmospheric dispersion factor during time interval j in second/meter (Table III.4)
(DCF).= thyroid dose conversion factor via inhalation for isotope i in rem/Ci (Table III.5) thyroid dose via inhalation in rem Results Thyroid doses at the Exclusion Area Boundary and Low Population Zone are presented in Table III.6. All doses are well within the allowable guidelines as specified by Standard Review Plan 15.6e3 and 10CFR100.
1074v:1D/112487                        46
 
WESTINGHOUSE PROPRIETARY CLASS 2 TABLE  I I I.1 PARAMETERS USED    IN EVALUATING THE RADIOLOGICAL CONSEQUENCES OF A STEAM GENERATOR TUBE RUPTURE I.       Source Data A. Core power  level, MWt                        1520 B. Total steam generator tube                    0.2 leakage, prior to accident,   gpm C. Reactor coolant iodine activity:
: 1. Accident  Initiated  Spike                The  initial    RC iodine activities  based on I
1
                                                              >Ci/gram of D.E. I-131 are presented in Table III.3. The iodine appearance rates assumed for the accident initiated spike are presented  in Table    III.2.
2,   Pre-Accident Spike                        Primary coolant iodine activities  based on 60 gCi/gram of D.E. I-131 are presented in Table I I I.3.,
D. Secondary system  initial activity            Dose  equivalent of 0.1 yCi/gm of I-131, presented in Table III.3.
1074v:1D/112087                              47
 
HESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.l (Sheet 2)
E. Reactor coolant mass, grams                    1.27 x 10 F. Steam    generator  mass                      3.39 x  10 (each), grams G. Offsite    pow'er                              Lost at time of reactor trip H. Primar y-to-secondary leakage duration for intact      SG, hrs.
I. Species of iodine                                100 percent elemental II. Activity Release      Data A. Faulted steam generator
: 1. Rupture flow                              See Table  II.5 or II.G
: 2. Rupture flow flashing      fraction        See  Figure  III.1
: 3. Iodine scrubbing plus moisture            See Figure  III.2 separator removal efficiency
: 4. Total steam release,     lbs              See Table  II.5 or II.G
: 5. Iodine partition factor
: a. Prior to overfill                    100
: b. After overfill                      -1.0 - See  Figure        III.3
: 6. Location of tube rupture                  [Top of Bundle]
                                                                            '074v:1 0/1120S7                                48
 
MESTINGHOUSE.PROPRIETARY CLASS 2 TABLE III.1 (Sheet 3)
B. Intact steam generator
: 1. Primary-to-secondary  leakage, gpm    0.1
: 2. Total steam release, lbs              See Table 11.5 or 11.6
: 3. Iodine partition factor                100 C. Condenser
: 1. Iodine  partition factor                100 D. Atmospheric Oispersion Factors              See Table III,4 1074v:lo/112087                            49
 
MESTINGHOUSE PROPRIETARY CLASS 2 TABLE  III.2 IODINE SPIKE APPEARANCE RATES (CURIES/SECOND) 1-132      3-133            I"134 0.94            2.22      1.74            3.07 1074v:1D/112087                        50
 
MESTINGHOUSE PROPRIETARY CLASS 2 TABLE  II I.3 IODINE SPECIFIC ACTIVITIES IN (yCi/gm) THE PRIMARY AND SECONDARY COOLANT BASED ON    1, 60 AND 0.1 yCi/gram  OF  D.E. I-131
                            ~Pi    t  1  1                    Secondar  Coolant Nuclide              ~luCD/ m            60 uCi/cDm            0,1 wCi/(1m 0.79                47.1                  0.079 I-132                0.35                20.7                  0. 035 1.01                60.7                  0.101 0.20                12.2                  0.020 I-135                0.79                47.1                  0.079 1074v:1D/1 12087                          51
 
MESTINGHOUSE PROPRIETARY CLASS 2 TABLE  III.4 ATMOSPHERIC DISPERSION FACTORS AND BREATHING RATES Time          Exclusion Area Boundary    Low  Population      Breathing 3                                3 (hours)       x/Q (Sec/m )             Zone x/Q (Sec/m )     Rate (m /Sec) [4]
0-2          4.8 x 10                  3 x 10                3.47 x 10 2-8                                    3x10                  3.47 x 10 1074v:1D/112087                            52
 
WESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.5 THYROID DOSE CONVERSION FACTORS (Rem/Curie) [51 Nuclide
                ~ I-131                    1.49 x 10 1.43 x 10 2.69 x 10 I-134                    3.73 x 10 5.60 x 10 1074v:1D/112087                        53
 
NESTINGHOUSE PROPRIETARY CLASS 2 TABLE  III.6 RESULTS Ooses Rem Allowable Case  1  Case 2  Guideline Value
: l. Accident    Initiated Iodine S ike Exclusion Area Boundary (0-2    hr.)
Thyroid                          26.4      3.8          30 Low  Population Zone (0-8 hr.)
Thyroid                          1.7      0.3          30
: 2. Pre-Accident Iodine    S ike Exclusion Area Boundary (0-2    hr.)
Thyroid                          102.1    22.1          300, Low  Population Zone (0-8 hr.)
Thyroid                          6.4      1.4          300    ~
1074v:1D/112487                            54
 
WESTINGHOUSE PROPRIETARY CLASS 2 GINN4 SGTR IS% TUBE PLUGGING            -   C4SE R4OIOLOGIC4L CONSEOUENCES EV4LU4TION BREAK FLOW FL4SNING FR4CTION
                      ~ IS                      Case 1 e.
                                      ~ It ~ Si,tt & TIIC
                                                            ~
Itttl tt ~ S4,lt ~ Si GINN4 SGTR ISZ TUBE PLUGGING                CASE 2 R4O IGLOO  I CAL CONSEOUENCES      EVALUATION BREAK FLOW FLASHING FR4CTION
                        ~ IS Case 2
                                    ~ It  H,tt  14 Tlet
                                                            ~
ItttI St  SI,at    ei Figure      III.1        Break Flow Flashing Fraction 1 074 v:1D/112087                                          55
 
HESTINGHOUSE PROPRIETARY CLASS 2 GL,G CASE 1 o5
              ~ 2 0
8                          1eee          1588 288 TINE (SECONDS) 4Z. (
                ~ 5 CASE 2
                ~ 2 V
M
            'I 0
1088        1508  288 TINE ISECONDSI Figure III.2    Srubbing Efficiency 1 074 v:1D/112087
 
WESTINGHOUSE PROPRIETARY CLASS 2 CASE 1 IE+2 1E+1 2
0
            ~a C
            <LE+8 1.5 ZIHE (HOURS)
CASE 2 JE+2 1E+1 2
0 C
C
            +IE+8 TIHE (HOURS)
Figure  III.3    Faulted  SG  Iodine Partition Factors 1074v:1D/112087                                    57
 
WESTINGHOUSE PROPRIETARY CLASS 2 IV. CONCLUSION The  potential radiological consequences    of  a steam generator tube failure were evaluated for the R.E. Ginna nuclear power plant to demonstrate that the use of the Standard Technical Specification (STS) primary coolant activity limit of 1 yCi/gram of dose equivalent I-131 will result. in offsite doses that are within the appropriate guidelines, The mass releases for a design basis double ended rupture of a single tube with a loss of offsite power were conservatively calculated using the computer code LOFTTR2. Two cases were considered:     [1) intact steam generator PORV fails closed and must be locally    1 opened, and 2) ruptured steam generator PORV fails open and must be locally isolated.]     'he    analysis explicitly modeled the time needed for to perform the recovery steps outlined in guideline E-3 of Revision the'perators 1 of the Westinghouse Owners Group Emergency Response Guidelines.       The resulting doses at the exclusion area boundary and low population zone are within the allowable guidelines as specified by Standard Review Plan 15.6.3 and 10CFR100. Consequently, the STS primary coolant activity limit is sufficiently low to ensure that the radiological consequences of a steam generator tube rupture at the R.E, Ginna plant will be within the guidelines.
1074v:1D/112087                            58
 
HESTINGHOUSE PROPRIETARY CLASS 2 V. REFERENCES
: 1. Lewis, Huang, Behnke, Fittante, Gelman,                 "SGTR Analysis Methodology to Determine the Margin to Steam Generator                  Overfill," HCAP-10698-P-A,   August 1987.     [PROPRIETARY'.
Lewis, Huang, Rubin, "Evaluation of Offsite Radiation Doses for a Steam Generator Tube Rupture Accident," Supplement 1 to HCAP-10698-P-A, March 1986.     [PROPRIETARY]
: 3. R. Elaisz, Letter from RGE to Hestinghouse concerning Ginna specific operator action times for SGTR analysis, February 7, 1985.
: 4. NRC  Regulatory Guide 1.4, Rev. 2, "Assumptions Used for Evaluating the Potential Radiological Consequences of a LOCA for Pressurized Hater Reactors", Jun'e 1974.
: 5. NRC  Regulatory Guide 1. 109, Rev. 1, "Calculation of Annual Doses to Man From Routine, Releases of Reactor Effluents for the Purpose of Evaluating Compliance with 10 CFR Part 50 Appendix I", October 1977.
: 6. Postma,             A. K., Tam, P. S., "Iodine Behavior in  a PHR  Cooling System Following                a Postulated Steam Generator Tube Rupture",   NUREG-0409.
1074v:1D/120487                                        59
 
I  ra V
0; J
ih}}

Latest revision as of 04:28, 4 February 2020

Forwards Application for Amend to License DPR-18,increasing Allowable RCA to Improved TS Values (NUREG-1431). Westinghouse Proprietary Rept WCAP-11668 & Nonproprietary Rept WCAP-11678 Encl.Proprietary Rept WCAP-11668 Withheld
ML17309A545
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/23/1994
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML17263A656 List:
References
RTR-NUREG-1431 NUDOCS 9405310164
Download: ML17309A545 (71)


Text

..ACCELERATED DISTRIBUTION DEMONS+ATION SYSTEM J

I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9405310164 DOC.DATE: 94/05/23 NOTARIZED: YES DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.*NAME AUTHOR AFFILIATION MECREDY,R.C. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R. Project Directorate I-3 +5 R

SUBJECT:

Forwards application for amend to license DPR-18,increasing I allowable RCA to improved TS values (NUREG-1431).

Westinghouse proprietary rept WCAP-11668 6 nonproprietary rept WCAP-11678 encl. Proprietary rept WCAP-11668 withheld. D DISTRIBUTION CODE: AP01D TITLE: Proprietary Review COPIES RECEIVED:LTR Distribution J ENCL L SIZE: / S Pre Operating License 6 Operating R NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

/

05000244 A

RECIPIENT COPIES RECIPIENT COPIES D ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 LA 1 1 PD1-3 PD 1 1 D JOHNSON,A 3 3 INTERNAL: AEO~D OA 1 1 OGC/HDS1 1 0

~GF fQE 01 1 1 EXTERNAL NRC PDR 1 0 D

S D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 7

g~

It 0 < ~

/////I/////// 'g//Z1

//I/// I/ I///////////

i/ ///I / /////SKf ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 ROBERT C. MECREDY TELEPHONE Vice President hREA CODE 7 t B 546 Clnna Nuclear Production May 23, 1994 2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Allen R. Johnson Project Directorate I-3 Washington, D.C. 20555

Subject:

Application for Amendment to Operating License Reactor Coolant Activity Technical Specifications Rochester Gas and Electric Corporation R.E. Ginna Nuclear Power Plant Docket No. 50-244 Ref.(a): NRC Letter, C. Rossi to A. Ladieu (WOG), "Acceptance for Referencing of Licensing Topical Report WCAP-10698...",

March 30, 1987.

(b): NUREG-0916, "Safety Evaluation Report Related to the Restart of R.E. Ginna Nuclear Power Plant", May 1982.

(c): RG&E Letter, R. Mecredy to A. Johnson (NRC), "Emergency Response Capability...", October 14, 1992.

(d): NRC Letter, A. Johnson to R. Mecredy (RG&E), Emergency Response Capability Conformance to Regulatory Guide 1.97, revision 3", February 24, 1993.

(e): WOG Letter, L. Walsh and A. Engel to R. Jones (NRC),

"Westinghouse Owners Group Steam Generator Tube Uncovery Issue", March 31, 1992.

(f): NRC Letter, R. Jones to L. Walsh (WOG), "Westinghouse Issue", March Owners Group, Steam Generator Tube Uncovery 10, 1993.

Dear Mr. Johnson:

The purpose of this application for Amendment to Operating License is to amend Appendix A of that License to increase the Technical Specification allowable primary coolant iodine (I-131) activity limit from 0.2 pC+igm to 1.0pCi/gm; and the total primary coolant activity from 84/E pCi/gm to the Standard Technical Specification value of 100/E pCi/gm, consistent with the Improved Technical Specifications (NUREG-1431).

WCAP-11668 (Proprietary)/WCAP-11678 (Non-Proprietary) evaluate the potential radiological consequences due to a steam generator tube rupture (SGTR) for the R. E. Ginna Nuclear Power Plant. This

'Ti4053101b4'Tl40523 PDR" ADOt"K'05000244 g

evaluation utilizes the analysis methodology of WCAP-10698-P-A "SGTR Analysis Methodology to Determine the Margin to Steam Generator Overfill." RG&E has met the requirements for usage of WCAP-10698 as outlined in Nuclear Regulatory Commission letter from C. E. Rossi (NRC) to A. E. Ladieu (WOG), (Reference a). The letter required each utility to provide five plant specific inputs:

1. Demonstration that critical operator action times used in the analysis are realistic and consistent with those observed during simulator exercises.
2. A site specific Steam Generator Tube Rupture radiological offsite consequence analysis.
3. A structural, analysis of the main steam 'ines demonstrating adequacy under water-filled conditions.
4. A list of systems, components, and instrumentation credited for accident mitigation and the specified safety grade for each.
5. A comparison of the plant to the "bounding plant" used in WCAP-10698.

Items 2 and 5 are addressed in .the site specific analysis being submitted with this letter, WCAP-11668 (Proprietary). Item 3 was addressed during the review of the Steam Generator Tube Rupture incident at Ginna Station. Its acceptability is documented in NUREG-0916, (Reference b). Item 4 is contained in our post-accident instrumentation submittal (Reference c) (re. Regulatory Guide 1.97). NRC review and acceptance of this information is documented in reference d. Item 1 is discussed below.

During the week of August 19 through 23, 1991 simulator runs of the two most limiting cases identified in WCAP-11668 (Proprietary)/

WCAP-11678 (Non-Proprietary), were made to validate assumed operator response times. These simulator runs demonstrated that not only were the operator response times assumed in the WCAPs conservative with adequate margin, but also that recent refinements in the emergency operating procedures have further reduced the likelihood of overfilling the ruptured steam generator. For the two limiting cases identified operator response prevented overfill with significant margin, and terminated break flow in under 45 minutes. In both cases it was necessary to use the WCAP assumed times for operator action outside the control room. These times were the limiting factors in the scenarios, as control room operators had to wait to proceed with further mitigating actions until these actions were assumed to be completed. Operator critique following the sessions indicated that they felt these times were unrealistically conservative. We, therefore, feel that actual mitigation times would be even less than those demonstrated during the simulator exercise.

WCAP-11668/11678 assumes the tube rupture remains covered through-

It I

out the event. More recently it has been suggested that, this assumption may not be conservative. The Westinghouse Owners Group (WOG) has undertaken a program to assess the consequences of tube rupture uncovery. The results indicate that the increase in doses is insignificant. These results were transmitted to the staff (Reference e). The staff has reviewed and approved this transmittal (reference f). Therefore, we feel this issue has been adequately addressed.

It should be noted that a proposal to modify Section 3.1.4.3.a has already been submitted to the NRC via letter May 13, 1994. Page 3.1-21 of Attachments B and C is being submitted in both versions, so that approval is not dependent on the sequence of proposed License Amendment Request reviews.

We request that upon NRC approval, this amendment should be considered effective immediately and implemented within 60 days.

Very ruly yours, o ert c. ecr y BJF/190 Attachment

Enclosures:

1~ One (1) submittal of an Application for Amendment to Operating License and associated safety evaluation.

2 ~ One (1) copy of an Application for Withholding, CAW-87-123, dated December 3, 1987, accompanying Affidavit, and Proprietary Information Notice 3 ~ One (1) copy of WCAP-11668, "LOFTTR2 Analysis of Potential Radiological Consequences Following a Steam Generator Tube Rupture at the R.E. Ginna Nuclear Plant", November 1987 (Proprietary).

4 ~ One (1) copy of WCAP-11678, "LOFTTR2 Analysis of Potential Radiological Consequences Following a Steam Generator Tube Rupture at, the R.E. Ginna Nuclear Plant", November 1987 (Non-Proprietary).

xc>> Mr. Allen R. Johnson (Mail Stop 14Dl)

Project Directorate I-3 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector

WESTINGHOUSE PROPRIETARY CLASS 2 WCAP" 11668 74>5'9Q V LOFTTR2 ANALYSIS OF POTENTIAL RADIOLOGICAL CONSEQUENCES FOLLOWING A STEAM GENERATOR TUBE RUPTURE AT THE R. E. GINNA NUCLEAR POWER PLANT

0. J. Mendler K. Rubin NOVEMBER 1987 Nuclear Safety Department This document contains information proprietary to Westinghouse Electric Corporation; it is submitted in .confidence and is to be used solely for the purpose for which it is furnished and returned upon request. This document and such information is not to be reproduced, transmitted, disclosed or used otherwise in whole or in part without authorization of Westinghouse Electric Corporation, Nuclear Energy Systems.

Westinghouse Electric Corporation Nuclear Energy Systems P.O. Box 355 Pittsburgh, Pennsylvania 15230 1987 by Westinghouse Electric Corporation 1074v:1OP/120487

I P.

'\

1 0

WESTINGHOUSE PROPRIETARY CLASS 2 This document contains material that is proprietary to the Westinghouse Electric Corporation. This propr'ietary information has been marked by means of brackets. The basis for marking the material proprietary is identified by marginal notes referring to the standards in Section 8 of the affidavit of R. A. Wiesemann of record "In the Hatter of Acceptance Criteria for Emergency .

Core Cooling Systems for Light Water Cooled Nuclear Power Reactors (Docket No.

RH-50-1)" at teanscript pages 3706 through 3710 (February 24, 1972).

Due to the proprietary nature of the material contained in this report which was obtained at considerable Westinghouse expense and the release of which would seriously affect our competitive position, we request this information to be withheld from public disclosure in accordance with the Rules of Practice, 10 CFR 2.790, and that the information presented therein be safeguarded in accordance with 10 CFR 2.903. We believe that withholding this information will not adversely affect the public interest.

This information is for your internal use only and should not be released to persons or organizations outside the directorate of Regulation and the ACRS without prior approval of Westinghouse Electric Corporation. Should 1

it become necessary to release this information to such persons as part of the review procedure, please contact Westinghouse Electric Corporation and they will make the necessary arrangements required to protect their proprietary'nterests.

1D74v:1D/7120B7

WESTINGHOUSE PROPRIETARY CLASS 2 TABLE OF CONTENTS Pacaes I. INTRODUCTION II. THERHAL HYDRAULIC ANALYSIS A. Design Basis Accident 2 B. Conservative Assumptions 3 C. Operator Action Times 6 D. Transient Description - Case 1 13 E. Transient Description - Case 2 24 F. Hass Releases 34 I I I. RADIOLOGICAL CONSEQUENCES ANALYSIS 43 IV. CONCLUSION 58 V. REFERENCES 59 1074v:1D/112087

0 0-

WESTINGHOUSE PROPRIETARY CLASS 2 I. INTRODUCTION An evaluation of the potential radiological consequences due to a steam generator tube rupture (SGTR) event has been performed for the R. E. Ginna nuclear power plant to demonstrate that the offsite radiation doses will be less than the allowable guidelines based on the Standard Technical Specification limit on primary coolant activity. The evaluation discussed herein assumes that 151. of the steam generator tubes are plugged.

A design basis steam generator tube rupture was analyzed for Ginna using the methodology developed in MCAP-10698 (reference 1) and the supplement to HCAP-10698 (reference 2). Two single failure cases were considered to determine which is the most limiting single failure for Ginna with respect to radiological. consequences. The two cases examined were:

a,c Case 1 Intact steam generator power operated relief valve (PORV) fails closed and must be locally opened.

Case 2 Ruptured steam generator power operated relief valve fails open and must be locally isolated.

Plant response to the event was modeled using the LOFTTR2 computer code with conservative assumptions of break size and location, condenser availability and initial secondary water mass in the faulted steam generator. The analysis methodology includes the simulation of the operator actions for recovery from' steam generator tube rupture based on the Westinghouse Owners Group Emergency Response Guidelines, which are the basis for the Ginna Emergency Operating Procedures. The mass releases were calculated with the LOFTTR2

~

program from the initiation of the event until termination of the break flow.

For the time period following break flow termination, steam releases and feedwater flows from the intact and faulted steam generators were determined from a mass and energy balance using the calculated RCS and steam generator conditions at the time of leakage termination. The mass releases for both cases were used to determine the radiation doses at the exclusion area boundary and low population zone assuming that the primary coolant activity 'is at the Standard Technical Specification limit prior to the accident.

1074v:1D/112087

MESTINGHOUSE PROPRIETARY CLASS 2 II. THERMAL HYDRAULIC ANALYSIS Integrated mass releases to the atmosphere and condenser during a steam generator tube rupture event were calculated for various time periods during the accident. This section includes the methods and assumptions used to model the SGTR event and calculate the mass releases, as well as the sequence of events for the recovery.

A. Desi n Basis Accident The accident modeled is the complete severance of a steam generator tube located at the tube sheet on the cold leg side. It was also assumed that loss of offsite power occurred at the time of reactor trip, and the worst rod was assumed to be stuck at reactor trip.

a,c The most limiting single failure with respect to steam generator overfill was determined by reference 1 to be a failed closed PORV on the intact steam generator. Since Ginna is a two loop plant, the intact steam generator PORV must be locally opened before RCS cooldown can begin. This additional time to locally open the intact steam generator PORV will delay RCS depressurization, causing an increase in total primary to secondary leakage. Consequently, more water will accumulate in the faulted steam generator. The case where the intact steam generator PORV fails to open on demand and must be locally opened will be referred to as Case 1.

The most limiting single failure with respect to offsite doses was determined by reference 2 to be a failed open PORV on the faulte'd steam generator. Failure of this PORV will cause an uncontrolled depressurization of the faulted steam generator which will increase primary to secondary leakage. Pressure in the ruptured steam generator will remain below that in the primary system until the failed PORV can be isolated, and recovery actions completed. The case where the faulted'team generator PORV fails open and must be locally isolated will be referred to as Case 2.

1074v:1D/112087

WESTINGHOUSE PROPRIETARY CLASS 2 B. Conservative Assum tions Plant responses and mass releases from the intact and faulted steam generator prior to break flow termination were calculated using LOFTTR2.

While modeling the SGTR event the following assumptions were made:

1. Reactor Tri on Overtem erature Delta-T a,c A turbine runback can be initiated automatically or the operator can manually reduce the turbine load to attempt to prevent a reactor trip on overtemperature delta-T. Although turbine runback is simulated in this analysis, credit is.not taken for delaying reactor trip. Reactor trip is assumed to occur on overtemperature delta-T. Due to the assumed loss of offsite power the condenser is not available for steam releases once the reactor is tripped. Consequently, after reactor trip the steam generator PORYs are used for steam releases. Thus an earlier trip time leads to more steam released to the atmosphere from the faulted and intact steam generators.
2. Power a

The initial steam generator water mass decreases with increasing power level., Thus, a lower initial power results in a higher initial steam generator secondary water mass which is conservative. On this basis, 100% nominal power was assumed for the analysis rather than considering an overpower factor.

3. Pressurizer Water Level a,c The RCS depressurization rate increases after the pressurizer empties. A higher pressurizer water level will increase the time required for the pressurizer to empty. This results in maintaining a higher primary to secondary pressure differential and thus a larger break flow rate for a longer time period. Therefore, it is concluded that maximizing the pressurizer water level is conservative.

1 074 v:1D/112087

HESTINGHOUSE PROPRIETARY CLASS 2

4. Steam Generator Seoond~ar Mass a,c A higher initial secondary water mass in the ruptured steam generator was determined by Reference 1 to be conservative for overfill. For the Case 1 analysis turbine runback was assumed initiated and was simulated by artificially increasing initial steam generator water mass. The initial steam generator total fluid mass was assumed to be lOA above nominal value plus the differential mass between 100% power and 70Ã power to simulate turbine runback. However, if steam generator overfill does not occur, a lower initial mass in the ruptur'ed steam generator results in a conservative prediction of offsite doses. .Thus, for Case 2 the initial secondary mass was assumed to correspond to operation at 10K below nominal steam generator water mass.
5. Break Location 4i, C The tube rupture analyzed is a double-ended break of one steam generator tube located at the top of the tube sheet on the outlet side of the steam generator. The location of the break on the cold side of the steam generator results in higher primary to secondary leakage than a break on the hot side of the steam generator as determined by reference 1. Therefore, it is concluded that the cold leg side break location is conservative.
6. Reactor Tri Oela a,c.

As noted previously, the results for cases which produce an earlier reactor trip are more conservative with respect to the radiological consequences from a SGTR. Thus, a minimum delay time from the reactor trip signal to reactor trip is conservative for the analysis. In addition, as noted above, no credit is taken for turbine runback delaying reactor trip.

1074v:10/112387

ttESTINGHOUSE PROPRIETARY CLASS 2

7. T~ti Ti D1 a,c Following a reactor trip, the turbine will be automatically tripped after a suitable delay time. Minimizing the delay time between reactor trip and turbine trip reduces the amount of steam flow to the turbine and increases the. secondary water inventory. Thus, a minimum delay time between reactor trip and turbine trip is conservative for the SGTR analysis.
8. Steam Generator Relief Valve Pressure Set oint Hith a loss of offsite power, the secondary pressure will increase following reactor and turbine trip, and steam will be relieved through the steam generator PORVs and safety valves. A lower steam generator relief valve pressure setpoint leads to a higher primary to secondary pressure differential and thus higher primary to secondary leakage.

Thus, the use of the lowest setpoint for the steam generator. relief valves is conservative for the analysis. Since the PORV setpoint is lower than .the safety valve setpoints, the use of the PORV setpoint of 1050 psig for steam relief is more conservative,

9. Pressurizer Pressure for SI Initiation a,c The use of the maximum pressurizer pressure setpoint for SI initiation results in earlier actuation of the SI system. This leads to the maintenance of a higher primary to secondary pressure differential and consequently a higher break flow rate for a longer time period. Thus, the use of the maximum pressurizer pressure setpoint for SI initiation

.in the analysis is conservative.

10. Leaka e after Overfill a,c Overfill is assumed to occur if the ruptured steam generator becomes water solid. No credit is taken for steam line volume.

1074v:10/1 12087

WESTINGHOUSE PROPRIETARY CLASS 2

11. Flashin Fraction a,c When calculating the amount of break flow that flashes to steam, 100 percent of the break flow is assumed to come from the hot leg side of the break. Since the tube rupture flow actually consists of flow from the hot leg and cold leg sides of the steam generator, the temperature of the combined flow will be less than the hot leg temperature and the flashing fraction will be correspondingly lower. Thus the assumption that 100 percent of the break flow comes from the hot leg is conservative for a SGTR analysis.

C. erator Action Times In the event of an SGTR, the operator is required to take actions to stabilize the plant and terminate the primary to secondary leakage. An evaluation has been performed (reference 1) to establish the operator action times for'use in the analysis of a design basis SGTR event. The operator actions which are required for recovery from an SGTR and the available data on the times to perform these actions have b'een reviewed.

The available data on operator action times for an SGTR includes information which has been obtained from reactor plant simulator studies as well as plant data from five actual SGTR events. Using this data, operator -action times have been established. which are considered to be appropriate for a design basis SGTR event. These operator action times were be used as input for the analysis of the design basis SGTR event.

The major operator actions for SGTR recovery which are included in the E-3 guideline of the Westinghouse Owners Group Emergency Response Guidelines were explicitly modeled in the analysis. The operator actions modeled include identification and isolation of the ruptured steam generator, cooldown and depressurization of the RCS to restore inventory, and termination of SI to stop primary to secondary leakage. These operator actions are described below.

1074v:1D/112087

MESTINGHOUSE PROPRIETARY CLASS 2

1. I.dentify the ruptured steam generator (step 2).

High secondary side activity, as indicated by the steam generator blowdown line radiation monitor or air ejector radiation monitor, typically will provide the first indication of an SBTR event. The ruptured steam generator can be identified by high activity in the corresponding steam generator blowdown line, main steamline, or water sample. For an SBTR that results in a high power reactor trip, the steam generator water level will decrease off-scale on the narrow range for both steam generators. The auxiliary feedwater (AFM) flow will begin to refill the steam generators, typically distributing approximately equal flow to both steam generators. Since primary to secondary leakage adds additional inventory which accumulates in the ruptured steam generator, level will return to the narrow range in that steam generator significantly earlier and will continue to increase more rapidly. This response provides confirmation of .an SGTR event and also identifies the ruptured steam generator.

2. Isolate the ruptured steam generator from the intact steam generator and isolate feedwater to the ruptured steam generator.(steps 3 and 4).

Once a tube rupture has been identified, recovery actions begin by isolating steam flow from and stopping feedwater flow to the ruptured steam generator. In addition to minimizing radiological releases, this also reduces the possibility of filling the ruptured steam generator with water by 1) minimizing the accumulation of feedwater flow and 2) enabling the operator to establish a pressure differential between the ruptured and intact steam generators as a necessary step toward terminating pr imary to secondary leakage. In the guideline for steam generator tube rupture recovery in the ERGs, the operator is directed to maintain the level in the ruptured steam generator between just on span and 50% on the narrow range instrument. Reference 1 assumed that the ruptured steam generator would be isolated when level in the steam generator reached [midway between these points]

'074v:1D/112487

WESTINGHOUSE PROPRIETARY CLASS 2

[(33% narrow range

'f level).] 'orfor level Ginna it was also conservative isolation. The ruptured steam to use [33 percent]

generator was assumed to be isolated at [33 percent narrow range level or at 10 minutes, whichever was longer.]

Cool down the Reactor Coolant System (RCS) using the intact steam generator (step 14).

After isolation of the ruptured steam generator, the RCS is cooled as rapidly as possible to less than saturation temperature corresponding to the ruptured steam generator pressure by dumping steam from only the intact steam generator . This ensures adequate subcooling in the.

RCS after depressurization to the ruptured steam generator pressure in subsequent actions., With offsite power available, the normal steam dump system to the condenser will provide sufficient capacity to perform this cooldown rapidly'. If offsite power is lost, the RCS is cooled using the power-operated relief valve (PORV) on the intact steam generator since neither the steam dump valves nor the condenser would be available. It is noted that RCS pressure will decrease during the cooldown as shrinkage of the reactor coolant expands the steam bubble in the pressurizer.

4. Depressurize the RCS to restore reactor coolant inventory (steps 17 or 18).

When the cooldown is completed, SI flow will increase RCS pressure until break flow matches SI flow. Consequently, SI'flow must be terminated to stop primary to secondary leakage. However, adequate reactor coolant inventory must first be assured. This includes both sufficient reactor coolant subcooling and pressurizer inventory to maintain a reliable pressurizer level indication after SI flow is stopped. Since leakage from the primary side will continue after SI flow is stopped until RCS and ruptured steam generator pressures equalize, an "excess" amount of inventory is needed to ensure 1074v:10/112487

WESTINGHOUSE PROPRIETARY CLASS 2 pressurizer level remains on span. The "excess" amount required depends on RCS pressure and reduces to zero when RCS pressure equals the pressure in the ruptured steam generator. To reduce break flow and establish sufficient pressurizer level, RCS pressure is decreased by opening the pressurizer PORV.

5. Terminate SI to stop primary to secondary leakage (steps 21-23).

The previous actions will have established adequate RCS subcooling, secondary side heat sink; and reactor coolant inventory following an SGTR to ensure that SI flow is no longer needed. When these actions have been completed, SI flow must be stopped to of the RCS and to terminate primary to secondary prevent'epressurization leakage. Primary to secondary leakage will continue after SI flow is stopped until RCS pressure and ruptured steam generator pressures equalize. Charging flow, letdown, and pressurizer heaters will then be controlled to prevent repressurization of the RCS'nd reinitiation of leakage into the ruptured steam .generator.

Since these major recovery actions will be modelled in the SGTR analysis, it is necessary to establish the times required to perform these actions.

Although the intermediate steps between the major actions will not be explicitly modelled, it is also necessary to account for the time required to perform the steps, It is noted that the total time required to complete the recovery-operations consists of both operator action time and system, or plant, response time; For instance, the time for each of the major recovery operations (i.e., RCS cooldown, RCS depressurization,'tc.)

is primarily due to the time required for the system response, whereas the operator action time is reflected by the time required for the operator to perform the intermediate action steps.

'The operator action times to initiate RCS cooldown, RCS depressurization and safety injection termination were developed in reference 1 and are listed in Table II.1. In addition to the operator action times developed in reference 1, Rochester Gas and Electric supplied the operator action 1074v:1D/112087

MESTINGHOUSE PROPRIETARY CLASS 2 times associated with recovering from the single failures (Reference 3).

[These operator 'actions, which would occur outside the control room, include locally opening the intact steam generator PORV, locally closing the intact steam generator PORV block valve and locally closing the faulted steam generator PORV block valve.] 'he times associated with performing these operator actions are listed in Table II.2. [It is noted that the 20 minutes to open the intact steam generator PORV consists of 10 minutes to identify and locate the valve and 10 minutes to linearly open the PORV. Due to limitations of LOFTTR2, the operator action to open the intact steam generator PORV was simulated as a step opening after a 15 minute delay, which results in an equivalent integrated steam flow through the PORV at the end of the 20 minute period.] '

074 v:i o/1 1 2087 10

MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.1 OPERATOR ACTION TIMES FOR DESIGN BASIS SGTR ANALYSIS Action Time min Identify and isolate ruptured SG Haximum of 10 min or calculated time to reach 334 narrow range level in the ruptured SG Operator action time to initiate cooldown Cooldown Calculated time for RCS cooldown Operator action time to initiate depressurization Depressurization Calculated time for RCS depressurization Operator action time to initiate SI termination SI termination and pressure Calculated time for SI termination equalization and equalization of RCS and ruptured SG pressures 1074v:1D/112087

WESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.2 GINNA SPECIFIC OPERATOR ACTION TIMES Q,C Action Time min Faulted Steam Generator PORV Block 15 Valve Closing-Local Action Intact Steam Generator PORV Opening-Local 20 Action Intact Steam Generator PORV Block Valve Closing-Local Action 1074v:1D/112087 12

PROPRIETARY CLASS 2 II'ESTINGHOUSE D. Transient Descri tion - Case 1

[Case 1 addresses a SGTR in which the single failure assumed is that the intact steam generator PORV fails to open on demand and must be locally opened.] 'he sequence, of events for Case 1 is presented in Table II.3.

Following the tube rupture, reactor coolant flows from the primary into the secondary side of the ruptured steam generator since the primary pressure is greater than the steam generator pressure. In response to this loss of reactor coolant, pressurizer level decreases as shown in Figure II.1. The RCS pressure also decreases as shown in Figure II.2 as the steam bubble in the pressurizer expands. As the RCS pressure decreases due to the continued primary to secondary leakage, automatic reactor trip occurs on an overtemperature delta-T trip signal.

After reactor trip, core power rapidly decreases to decay heat levels.

The turbine stop valves close and steam flow to the turbine is terminated. The steam dump system is designed to actuate following reactor trip to limit the increase in secondary pressure, but the steam dump valves remain closed due to the loss of condenser vacuum resulting from the assumed loss of offsite power at the time of reactor trip. Thus, the energy transfer from the primary system causes the secondary side pressure to increase rapidly after 'reactor trip until the steam generator.

PORVs lift to dissipate the energy, as shown in Figure II.3.

The RCS pressure decreases more rapidly after reactor trip as energy transfer to the secondary shrinks the reactor coolant and the leak flow continues to deplete primary inventory. The decrease in RCS inventory results in a low pressurizer pressure SI signal. Pressurizer level also decreases more rapidly following reactor trip and the pressurizer eventually empties as shown in Figure II.1. After the pressurizer empties, the RCS pressure rapidly decreases as shown in Figure II.2.

1074v:10/120487 13

WESTINGHOUSE PROPRIETARY CLASS 2 Since offsite power is assumed lost at reactor-trip, the RCPs trip and a gradual transition to natural circulation flow occurs. Immediately following reactor trip the temperature rise across the core decreases as core power decays (see Figure 11.4), however, the temperature rise subsequently increases as natural circulation flow develops. The cold leg temperatures trend toward the steam generator temperature as the fluid residence time in the tube region increases. The RCS temperatures continue to slowly decrease due to the continued addition of the auxiliary feedwater to the steam generators until operator actions are initiated to cool down the RCS.

major Operator Actions

1. Identify and Isolate the Ruptured Steam Generator Once a tube rupture has been identified, recovery actions begin by isolating steam flow from the ruptured steam generator and .throttling the auxiliary feedwater flow to the ruptured steam generator. As indicated previously, the ruptured steam generator is assumed to be identified and isolated when the narrow range level reaches [33%]

the ruptured steam generator or at [10] 'inutes after .

'n reach [33%] 's initiation of the SGTR, whichever is longer. For Ginna, the time to less than [10] 'inutes, thus the ruptured steam generator is assumed to be isolated at [10] 'inutes.

2. Cool down the RCS to Establish Subcooling Margin After isolation of the ruptured steam generator, there is a [5]

operator. action time imposed prior to initiating the cooldown. 'inute The actual delay time used in the analysis is 4 seconds longer because of the computer program requirements for simulating the operator actions. After this time, actions are taken to cool the RCS as rapidly as possible by dumping steam from the intact steam generators. Since offsite power is lost, the RCS is cooled by dumping steam to the atmosphere using the PORV on the intact steam generator.

[For Case 1, as previously noted, the intact steam generator]

'074 v:1D/112487 14

MESTINGHOUSE PROPRIETARY CLASS 2

[PORV fails to open. For the analysis, it was assumed that the valve was fully opened after an additional period of 15 minutes (see pg.

10). Thus at 1804 seconds the intact steam generator PORV is opened for RCS cooldown.] 'he cooldown is continued unti 1 RCS subcooling at the ruptured steam generator pressure is 20'F plus an are satisfied it is assumed that it close the intact steam generator PORV block valve.] 't allowance of 17'F for subcooling uncertainty. [When these conditions takes the operator five minutes to is noted that overfill of the ruptured steam generator occurs during this time period at '[2372] 'econds, as shown in Figure II.6. This cooldown ensures that there will be adequate subcooling in the RCS after the subsequent depressurization of the RCS to the ruptured steam generator pressure. The reduction in the intact steam generator pressure required to accomplish the cooldown is shown in Figure II.3, and the effect of the cooldown on the RCS temperature is shown in Figure II.4. The RCS pressure also decreases during this cooldown process due to shrinkage of the reactor coolant as shown in Figure II.2.

3, Depressurize RCS to Restore Inventory After the RCS cooldown, a [2] 'inute operator action time is included prior to depressurization. The RCS is depressurized at 2688 seconds to assure adequate coolant inventory prior to terminating SI flow. Mith the RCPs stopped, normal pressurizer'pray is not available and thus the RCS is depressurized by opening a pressurizer PORV. The depressurization is continued until any of the following conditions are satisfied: RCS pressure is less than the ruptured steam generator pressure and pressurizer level is greater than 0% plus an allowance of 3% for pressurizer level uncertainty, or pressurizer, level is greater than 80% minus an allowance of 3% for pressurizer level uncertainty, or RCS subcooling is less than the 17'F allowance for subcooling uncertainty. The RCS depressurization reduces the break flow as shown in Figure II.5 and increases SI flow to refill the pressurizer, as shown in Figure II.1.

1074v:10/112487 15

WESTINGHOUSE PROPRIETARY CLASS 2

4. Terminate SI to Stop Primary to Secondary Leakage The previous actions should have established adequate RCS subcooling, verified a secondary side heat sink, and restored the reactor coolant inventory following a SGTR to ensure that SI flow is no longer needed. When these actions have been completed, the SI flow must be stopped to prevent repressurization of the RCS and to terminate primary to secondary leakage. The SI flow is terminated when the RCS pressure increases,,minimum AFW flow is available and at least one intact steam generator level is in the narrow range, RCS subcooling is greater than the 17'F allowance for subcooling uncertainty, and the pressurizer level is greater than the 3X allowance for pressurizer level uncertainty. To assure that the RCS pressure is increasing, SI was not terminated in the analysis until the RCS pressure increased to 50 psi above the ruptured steam generator pressure.

After depressurization is completed, an operator action time of

[1] 'inute is imposed prior to SI termination. The primary to secondary leakage continues after the SI flow is terminated until the RCS and ruptured steam generators equalize. This occurs when'the intact steam generator PORV is locally opened to cooldown the RCS so that subcooling may be maintained. When the PORV is opened the increased energy transfer from primary to secondary depressurizes the RCS to the ruptured .steam generator pressure.

1074v:10/112087 16

MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.3 SEQUENCE OF EVENTS CASE 1 d., C EVENT Time sec Reactor Trip 50 Ruptured. SG Isolated 600 Intact SG PORV Opened 1804 Overfill Ruptured SG 2372 Intact SG PORV Isolated 2568 PRZR PORV Opened 2688 PRZR PORV Closed 2738 SI Terminated 2798 Intact PORV Opened 3288 Break Flow Terminated 3428 1074v:1D/112087 17

WESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE 1 188.

88 ~

78.

68.

4J 68.

t4 48.

38.

18 ~

8.

8. .1Ei84 .2E+84 .3Ei84 .4E~84 TINE (SEC)

Figure II.1 Pressurizer Level - Case 1 1074v:1D/112087 18

MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE I

.25E+84

.225Ei84

.2E 84

.175E'84

. 15E+84 Ld

~, 12SE LJ

~ 84 Of

~o .1E 84 Of 758.

588.

258.

. IE~84 .2E 84 .3E ~ 84 .4E 84 TIME (SEC)

Figure II.2 RCS Pressure - Case 1 1 074 v:10/112087 19

MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS IS PERCENT TUBE PLUGGING CASE I

.I4E 84

. 12Ei84 RUPTURED LOOP

. 1E ~ 84 888. INTACT LOOP OC 688.

C) ill 488.

288.

8.

. IE ~ 84 .2E 84 .3E ~ 84 .4E ~ 84 TINE (SEC)

Figure II.3 Secondary Pressure - Case 1 1 074 v:1D/11208l 20

MESTINGHOUSE PROPRIETARY CLASS 2 G INNA STEAi1 GENERATOR TUBE RUPTURE ANALYSIS PERCENT TUBE PLUGGING CASE 1 658.

688.

~ 558.

4J CD 588.

~ 458.

I X

488.

C) 358.

CD CD

~ 388.

258 ~

288 '. . 1E ~ 84 . .2E ~ 84 .3E ~ 84 ~ 4E ~ 84 TI11E (SEC)

Figure II.4 Intact Loop Hot and Cold Leg RCS Temperatures - Case 1 1074v:10/112087 21

MESTINGHOUSE PROPRIETARY CLASS 2 G INNA STEAI1 GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE 1 168.

I48.'SSUE 128 Ul K

lD 88.

C) 68 ~

hC EZ IIJ m 48.

28.

-28. .4E+84

..IE~84 .2E ~ 84 .3E 84 TIt1E ISEC)

Figure II.5 Primary to Secondary Leakage - Case 1 1074v:1D/112087 22

MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAI1 GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE 1

.6E 84

.SE 84

~ .4E ~ 84

~ .3'4 0

.2Ei84

.1E 84

. lE. 84 .2E~B4 .3E~84 .4E~84 TlNE tSEC)

Figure II.S Ruptured SG Rater Volume - Case 1 1074v:1D/112081 23

WESTINGHOUSE PROPRIETARY CLASS 2 E. Transient Descri tion - Case 2

[Case 2 addresses a SGTR in which the single failure assumed is that the faulted steam generator PORV fails open at the time the faulted steam generator is isolated.] 'hus, the Case 2 transient is similar to the Case 1 transient until that time. .The sequence of events for Case 2 is I

presented in Table II.4.

Following the tube rupture the RCS pressure decreases as shown in Figure 11.7 due to the primary to secondary leakage. In response to this depressurization, the reactor trips on overtemperature delta-T. After reactor trip, core power rapidly decreases to decay heat levels and the RCS depressurization becomes more rapid. The steam dump system is inoperable due to the assumed loss of offsite power, which results in the secondary pressure rising to the steam generator PORV setpoint as shown in Figure 11.8. The decreasing pressurizer pressure leads to an automatic SI signal on low pressurizer pressure. Pressurizer level also decreases more rapidly following reactor trip until it eventually empties, as shown in Figure 11.9.

major Operator Actions

1. Identify and Isolate the Ruptured Steam Generator The ruptured steam generator is assumed to be identified and isolated at [10 minutes after the initiation of the SGTR or when the narrow range level reaches 33%, whichever time is greater.] 'or this case, the time to reach [33/] 'arrow range level is [652]

and thus, it was assumed that the ruptured steam generator is

'econds, isolated at that time. [The ruptured steam generator PORV is also assumed to fail open at this time.] 'he failure causes the steam generator to rapidly depressurize, which results in an increase in primary to secondary leakage. The depressu'rization of the ruptured steam generator increases'he break flow and energy transfer from primary to secondary which results in RCS pressure and temperature decreasing more rapidly than in Case 1. The ruptured steam generator 1074v:10/120487 24

MESTINGHOUSE PROPRIETARY CLASS 2 depressurization causes a cooldown in the intact steam generator loop. As the'ntact steam generator hot leg temperature decreases below the steam generator water temperature reverse heat transfer takes place as shown in Figure II. 10. [It is assumed that the time required for the operator to identify that the ruptured steam generator PORV is open and to close the associated block valve is 15 minutes. Thus, at 1558 seconds the depressurization of ruptured steam generator is terminated.] ',c

2. Cool Down the RCS to establish Subcooling Margin

[After the ruptured steam generator PORV block valve is closed,'here is a 5 minute operator action time imposed prior to initiation of cooldown.] 'he depressurization of the ruptured steam generator affects the RCS cooldown target temperature since the temperature is dependent upon the pressure in the ruptured steam generator. Since

'ffsite power is lost the RCS is cooled by dumping steam to the atmosphere using the intact steam generator PORV. The cooldown is continued until RCS subcooling at the ruptured steam generator pressure is 20'F plus an allowance of 17'F for instrument uncertainty. Hecause of the lower pressure in the ruptured steam generator the associated temperature the RCS must be cooled to is also lower, which has the net effect of extending the time for cooldown.

For Case 2 cooldown begins at [1858] 'econds 'and is completed at

[2852] 'econds.

The reduction in the intact steam generator pressure required to accomplish the cooldown is shown in Figure II.8, and the effect of the cooldown on the RCS temperature is shown in Figure II.10. The RCS pressure also decreases during this cooldown process due to shrinkage of the reactor coolant as shown in Figure II.7.

3. Depressurize to Restore Inventory After the RCS cooldown, a [2] 'inute operator action time is included prior to depressurization. The RCS is depressurized at

[2974] 'econds to assure adequate coolant inventory prior to 1074v:10/112487 25

HESTINGHOUSE PROPRIETARY CLASS 2 terminating SI flow, -Hith the RCPs stopped, normal pressurizer spray is not available and thus the RCS is depressurized by opening a pressurizer PORV. The depressurization is continued until any of the following conditions are satisfied: RCS pressure is less than the ruptured steam generator pressure and pressurizer level is greater than 0% plus an allowance of 3% for pressurizer level uncertainty, or pressurizer level is greater than 80% minus an allowance of 3% for pressurizer level uncertainty, or RCS subcooling is less than the 17'F allowance for subcooling uncertainty. The RCS depressurization reduces the break flow as shown in Figure II.11 and increases SI flow to refill the pressurizer, as shown in Figure 11.9.

4. Terminate SI to Stop Primary to Secondary Leakage, The previous actions should have established adequate RCS subcooling, verified a secondary side heat sink, and restored the reactor coolant inventory following an SGTR to ensure that SI flow is no longer needed. Nhen these actions have been completed, the SI flow must be stopped to prevent repressurization of the RCS and to terminate primary to secondary leakage. The SI flow is terminated when the RCS pressure increases,'minimum AFH flow is available and at least one intact steam generator level is in the narrow range, RCS subcooling is greater than the 17'F allowance for subcooling uncertainty, and the pressurizer level is greater than the 3% allowance for pressurizer level uncertainty. To assure that the RCS pressure is increasing, SI was not terminated until the RCS pressure increased to 50 psi above the ruptured steam generator pressure.

After depressurization is completed, an operator action time of

[1] 'inute is imposed prior to SI termination. Figure II.11 shows that the primary to secondary leakage continues after the SI flow is stopped until the RCS and ruptured steam generator pressure equalize. The ruptured steam water volume is shown in Figure II.12.

For Case 2, the ruptured steam generator does not overfill.

1074v:1D/112487

MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.4 SEQUENCE OF EVENTS CASE 2 EVENT TIME sec Reactor Trip 49.4 Ruptured SG Isolated a.c Ruptured SG PORV Fails Open Ruptured SG Block Valve Closed 1558 Intact SG PORV Opened 1858 Intact SG PORV Closed 2852 PRZR PORV Opened 2974 PRZR PORV Closed 3006 SI Terminated 3066 Break Flow Terminated 3438 1D74v:1O/112087 27

WESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAt1 GENERATOR TUBE RUPTURE 4NAL'/SIS 15 PERCENT TUBE PLUGGING CASE 2 2588.

2258.

2888.

CC l758.

1588.

~ 1258.

cn I 888.

758.

588.

258.

8.

8. 588. 1888. l588. 2888 '588. 5888. 5588." 4888.

TIME(SEC)

Figure II.7 RCS Pressure - Case 2 1074v:10/112087 28

HESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE 2 1488.

RUPTURED LOOP 1288.

l888.

w 888.

688.

INTACT LOOP w 488, 288,

8. 588. 1888.:l588. 2888. 2588. 3888. 3588. 4888.

TIME(SEC)

Figure II.8 Secondary Pressure - Case 2 1074v:10/112087 29

WESTINGHOUSE PROPRIETARY CLASS 2 G1NNA STEAN GENERATOR TUBE RUPTURE ANALYS15 15 PERCENT TUBE PLUGGING CASE 2 188.

98.

e8.

78.

LJ w 68.

'58.

48 ~

38.

0 28.

18.

8.

8. 588. 1888. 1588. 2888 '588. 3888. 3588. 4888.

TINE ( SEC )

Figure II.9 Pressurizer Level - Case.2 1074v:10/1 1ZOST 30

MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALVSIS 15 PERCENT TUBE PLUGGING CASE 2 658.

688. THOT

~ 558.

O , TCOLD THOT 588. TCOLD

~z. 458.

ox 488.

I THOT TCOLD o 358, 388.

258

'88.

8. 588. 1888. 1588. 2888. 2588. 3888. 3588. 4888.

T I ME ( SEC )

Figure II.10 Intact Loop Hot and Cold Leg RCS Temperatures - Case 2 1074v:1D/1 12087 31

MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALVSIS 15 PERCENT TUBE PLUGGING CASE 2 78.

w 68 ~

58.

o 48.

38.

oc 28.

I8,

-18.

-28

8. 588. 1888. 1588. 2888. 2588. 3888. 3588. 4888.

TIME(SEC)

Figure II.11 Primary to Secondary Leakage - Case 2 1074v:1D/112087 32

MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING

'ASE 2 6888.

H)

I

~ 5888.

K o 4888.

~ 5888.

~g 2888 ~

I888.

8. 588. 1888. 1588. 2888. 2588. 5888. 5588. 4888.,

T I ME ( SEC )

Mater Volume Case Figure 11,12 Ruptured SG 2 1074v:1D/112087 33

WESTINGHOUSE PROPRIETARY CLASS 2 F. Mass Releases The mass releases were determined for each of the single failure cases for use in evaluating the exclusion area boundary and low population zone radiation exposure. The steam releases from the ruptured and intact steam generators, the feedwater flows to the ruptured and intact steam generators, and primary to secondary break flow into the ruptured steam generator were determined for the period from accident initiation until 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after the accident and from 2 to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after the accident. The releases for 0-2. hours are used to calculate the radiation doses at the exclusion area boundary for a 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> exposure, and the releases for 0-8 hours are used to calculate the radiation doses at the low population zone for the duration of the accident.

In the LOFTTR2 analyses, the SGTR recovery actions in the E-3 guideline were simulated until the termination of primary to secondary leakage.

After the primary to secondary leakage is terminated, the operators will continue the SGTR recovery actions in the E-3 guideline to prepare the plant for cooldown to cold shutdown conditions. These actions include establishing normal Chemical and Volume Control System (CVCS) operation to provide reactor coolant inventory control and a boration path; restarting a reac'tor coolant pump (RCP), if none are running, to ensure homogeneous RCS conditions and to provide normal pressurizer spray; or stopping one RCP, if both are running, to minimize the heat input'uring the subsequent cooldown; and the actions necessary to'inimize the spread of contamination on the secondary side. When the instructions provided in E-3 are completed, the plant should be cooled and depressurized to cold shutdown conditions. There are three alternate means of performing the post-SGTR cooldown provided in the WOG Emergency Response Guidelines. The guidelines are: ES-3.1, POST-SGTR COOLDOWN USING BACKFILL; ES-3.2, POST-SGTR COOLDOWN USING BLOWDOWN; and ES-3.3, POST-SGTR COOLDOWN USING STEAM DUMP. The preferred methods are using backfill or blowdown since these methods minimize the radioactivity released to the atmosphere. The ES-3.3 guideline using steam dump provides the fastest method for 1074v:1D/112087 34

WESTINGHOUSE PROPRIETARY CLASS 2 depressurizing the RCS and ruptured steam generator. This method also results in the worst radiological releases, especially if steam dump to the condenser is unavailable. Therefore, the method using steam dump was selected for evaluation of the long-term mass releases since this produces conservative results for the offsite dose evaluation. It is noted that the use of the steam dump method would not be permitted if steam generator overfill occurs and water enters the main steamlines.

The high level actions for the ES-3.3 guideline are discussed below,

1. Prepare for Cooldown to Cold Shutdown The initial steps to prepare for cooldown to cold shutdown are performed in the E-3 guideline following SI termination, and these steps will be continued in ES-3.3 if they have not already been completed. A few additional steps are also performed in ES-3.3 prior

. to initiating cooldown. These include isolating the cold leg. SI accumulators to prevent unnecessary injection, energizing pressurizer heaters as necessary to saturate the pressurizer water and to provide for better pressure control, and assuring adequate shutdown margin in the event of potential boron dilution due to in-leakage from the

'ruptured steam generator.

2. Cooldown RCS to Residual Heat Removal (RHR) System Temperature The RCS is cooled by steaming and feeding the intact steam generator similar to a normal cooldown. Since all immediate safety concerns have been resolved, the cooldown rate should be maintained less than the maximum allowable rate of 100'F/hr. The preferred means for cooling the RCS is steam dump to the condenser since this minimizes the radiological releases and conserves feedwater supply. The PORV for the intact steam generator can also be used if steam dump to the condenser is unavailable. When the RHR system operating temperature is reached, the cooldown is stopped until RCS pressure can also be decreased. This ensures that pressure/temperature limits will not be exceeded.

1074v:1D/112087 35

WESTINGHOUSE PROPRIETARY CLASS 2

3. Depressurize RCS to RHR System Pressure When the cooldown to RHR system temperature is completed, the pressure in the ruptured steam generator is decreased by releasing steam from the ruptured steam generator. Steam release to the condenser is preferred since this minimizes radiological releases. However, steam can also be released to the atmosphere using the PORV on the ruptured steam generator. An evaluation of the potential radiological consequences should be performed before releasing steam from the ruptured steam generator to the atmosphere. As the ruptured steam generator pressure is reduced, the RCS pressure is maintained equal to the pressure in the ruptured steam generator in order to prevent in-leakage of secondary side water or additional primary to secondary leakage. Normal pressurizer spray is the preferred means of RCS pressure control since this conserves coolant inventory. If pressurizer spray is not available, a pressurizer PORV or auxiliary spray can be used to control RCS pressure.

When overfill of the ruptured steam generator occurs, as with Case 1, guideline ES-3.1 POST-SGTR COOLDOWN USING BACKFILL is assumed to be used. The high level actions for ES-3.1 are similar to ES-3.3.

However, the method by which ES-3.1 instructs the operator to depressurize the ruptured steam generator differs from ES-3.3. In Guideline ES-3.1 the RCS is depressurized to promote back flow through the failed tube which depressurizes the ruptured steam generator without steam releases to the atmosphere.

4. Cooldown to Cold Shutdown When RCS temperature and pressure have been reduced to the RHR system in-service values, RHR system cooling is initiated to complete the cooldown to cold shutdown. When cold shutdown conditions are achieved, the pressurizer can be cooled to terminate the event.

1074v:1O/112087 36

WESTINGHOUSE PROPRIETARY CLASS 2 F.1 Methodology for Calculation of Mass Releases L2,C The operator actions for the SGTR recovery up to the termination of primary to secondary leakage are simulated in the LOFTTR2 analyses. Thus, the steam releases from the ruptured and intact steam generators, the feedwater flows to the ruptured and intact steam generators, and the primary to secondary leakage into the ruptured steam generator were determined from the LOFTTR2 results for the period from the initiation of the accident until the leakage is terminated.

Following the termination of leakage, the operators are assumed to complete the steps in the E-3 and ES-3.3 or ES-3.1 guidelines to prepare for cooldown to cold shutdown. The time from leakage termination until the initiation of cooldown was assumed to be 20 minutes (see Reference 2). The assumed time of 20 minutes to initiate the cooldown is considered to be conservative, since the actual time is expected to be longer for an actual event because an evaluation of the potential offsite radiation doses would be required prior to using the steam dump method for the post-SGTR cooldown. It was assumed that the RCS and intact steam generator conditions are maintained stable during the 20 minute period until the cooldown is initiated. The PORV for the intact steam generator was then assumed to be used to cool down the RCS to the RHR system operating temperature of 332'F, at the maximum allowable cooldown rate of 100'F/hr.. The RCS and the intact steam generator temperatures at 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> were then determined using the RCS and intact steam generator parameters at the time of leakage termination and the RCS cooldown rate.'he steam releases and the feedwater flows for the intact steam generator for the period from leakage termination until 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> were determined from a mass and energy balance using the calculated RCS and intact steam generator conditions at the time of leakage termination and at 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. The core decay heat and the heat added from the operation of one RCP were included in the energy balance for this time period. Since the ruptured steam generator is isolated, no change in the ruptured steam generator conditions is assumed to occur until subsequent depressurization. The assumptions of a reasonably short preparation time for cooldown and the maximum cooldown rate result in minimum RCS and steam generator temperatures at 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, and therefore, a conservative estimate of the steam released to the atmosphere during the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

1074v:1D/112087 37

HESTINGHOUSE PROPRIETARY CLASS 2 a,c

'The RCS cooldown was assumed to be continued after 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> until the RHR system in-service temperature of 332'F is reached. Depressurization of the ruptured steam generator was then assumed to be performed immediately following the completion of the RCS cooldown. The ruptured steam generator was assumed to be depressurized to the RHR in-service pressure of 343 psia via steam release from the ruptured steam generator PORV, since this maximizes the steam release from ruptured steam generator to the atmosphere which is conservative for the evaluation of the offsite radiation doses. The RCS pressure is also assumed to be reduced concurrently as the ruptured steam generator is depressurized to minimize flow between the RCS and the ruptured steam generator. It is assumed that the continuation of the RCS cooldown and depressurization to RHR operating conditions are completed within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after the accident since there is ample time to complete the operations during this time period. The steam releases and feedwater flows from 2 to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> were determined for the intact steam generator from a mass and energy balance using the RCS and steam generator conditions at 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at the RHR system in-service conditions. The core decay heat and the heat addition due to the operation of one RCP were also included in the energy balance for this time interval. The steam released from the ruptured steam generator from 2 to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> was determined. based'n a mass and energy balance for the ruptured steam generator using the conditions at the time of leakage termination and saturated conditions at the RHR in-service pressure.

After 8 hours, it is assumed that further plant cooldown to cold shutdown as well as long-term cooling is provided by the RHR system. Therefore, the steam

~

releases to the atmosphere are terminated after RHR in-service conditions are assumed to be .reached at 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

F.2 Hass Release Results The mass release calculations were performed for both single failure cases using the methodology discussed above. For the time period from initiation of the accident until leakage termination, the releases were determined from the LOFTTR2 results for two separate periods for use in the dose calculations.

The first time period considered is from accident initiation until reactor trip. Since the condenser is in service until reactor trip, any radioactivity 1074v:1D/112087 38

WESTINGHOUSE PROPRIETARY CLASS 2 released to the atmosphere prior to reactor trip will be through'he condenser air ejector. After reactor trip,'he releases to the atmosphere are assumed to be via the steam generator PORVs. The mass releases calculated from the time of leakage termination until 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and from 2-8 hours are also assumed to be released to the atmosphere via the steam generator PORVs. The mass releases for the SGTR event [assuming delayed use of the intact steam generator PORV] 'Case 1) are presented in Table II.5. The results indicate that approximately [21,990] 'bm of steam and [23,710] 'bm of water is released from the ruptured steam generator to the atmosphere in the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. A total of [129,300] 'bm of primary water is transferred to the secondary side of the ruptured steam. generator before the break flow is terminated.

The mass releases for the SGTR event assuming [failure and isolation of the ruptured steam generator PORV] 'Case 2) are presented in Table II.6. The results indicate that approximately [62,480] 'bm of steam is released to the atmosphere from the ruptured steam generator within the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

After 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> [33,300] 'bm is released to the atmosphere from the ruptured steam generator. A total of [172,800] 'bm of primary water is transferred to the secondary side of the ruptured steam generator before break flow is terminated.

1074v:1D/112087 39

MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.5 CASE 1 MASS RELEASES TOTAL MASS FLOW (POUNDS)

TIME PERIOD 0-TRIP TRIP TMSEP - OVFILL - TTBRK - T2HRS TMSEP OVFILL TTBRK T2HRS 'RHR Faulted SG PIC Condenser 47,800 0 0 0 0 Atmosphere 0 15,450 6540 23,710*

Feedwater 43,600 30,500 0 0 0 Intact SG Condenser 47,150 0 0 0 0 0 Atmosphere 14,730 32,950 13,450 151,870 505,500 Feedwa ter 47,150 46,040 29,610 17,900 158,700 513,500 Break Flow 4216 47,574 53,710 23,800 TRIP = Time of reactor trip = [50] 'ec.

TMSEP = Time when water reaches the moisture separators = [1086] 'ec.

OVF ILL = Time when steam generator overfills = [2372] 'ec.

TTBRK = Time when break flow is terminated = [3428] 'ec.

T2HRS = Time at 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> = 7200 sec.

TRHR = Time to reach RHR in-service conditions, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> = 28,800 sec.

  • Ha'ter 1074v:1D/1120Sl 40

MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.6 CASE 2 MASS RELEASES

~

TOTAL MASS FLOM (POUNDS)

TIME PERIOD 0-TRIP TRIP TMSEP " TTBRK - T2HRS TMSEP TTBRK T2HRS TRHR CL, C Faulted SG Condenser 46,880 0 0 Atmosphere 62,090 390 33,300 Feedwater 42,740 33,260 0 Intact SG Condenser 46,220 0 0 0 0 Atmosphere 35,430 18,450 153,920 457,000 Feedwater 46,220 97,780 19,700 160,300 457,700 Break Flow 4134 132,666 36,000 0 0 TRIP = Time of reactor trip = [49.4] 'ec.

TMSEP = Time when water reaches the moisture separators = [2372] 'ec.

TTBRK = Time when break flow is terminated = [3438] 'ec.

T2HRS = Time at 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> = 7200 sec.

TRHR = Time to reach RHR in-service conditions, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> = 28,800 sec.

1074v:1D/112087 41

MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.7 SUMMARIZED MASS RELEASES TOTAL MASS FLOM (POUNDS)

CASE 1 CASE 2 0- TTBRK - 2HRS- 0 - TTBRK - 2HRS TTBRK 2HRS 8HRS TTBRK 2HRS 8HRS Faulted SG Condenser 47,820 46,880 Atmosphere 45,700* 62,480 33,300 Feedwater 74,100 76,000 Intact SG Condenser 47,150 46,220 0 Atmosphere 61,130 151,870 505,500 53,880 153,920 457,000 Feedwater 122,800 158,700 513,500 163,700 160,300 . 457,700 Break Flow 129,300 0 172,800 0 23,710 ibm of this is water.

1074v:10/1120S7 42

WESTINGHOUSE PROPRIETARY CLASS 2 II I. RADIOLOGICAL CONSEQUENCES ANALYSIS The evaluation of the radiological consequences of a steam generator tube rupture, assumes that the reactor has been operating at the proposed Technical Specification limit for primary coolant activity and at the existing Technical Specification limit for primary to secondary leakage for sufficient time to establish equilibrium concentrations of radionuclides in the reactor coolant and in the secondary coolant. Radionuclides from the primary coolant enter the steam generator, via the ruptured tube, and are released to the atmosphere through the steam generator safety or power operated relief valves and via the 4

condenser air ejector, exhaust.

The quantity of radioactivity released to the environment, due to a SGTR, depends upon primary and secondary coolant activity, iodine spiking effects, primary to secondary break flow, break flow flashing fractions, attenuation of iodine carried by the flashed portion of the break flow, partitioning of iodine between the liquid and steam phases, the mass of fluid released from the generator and liquid-vapor partitioning in the turbine condenser hot well. All of these parameters were conservatively evaluated for a design basis double ended rupture of a single tube.

A.'esi n Basis Anal tical Assum tions The major'assumptions and parameters used in the analysis are itemized in Table 111.1. The following is a discussion of the source term.

Source Term Calculations The radionuclide concentrations in the primary and secondary system, prior to and following the SGTR are determined as follows:

a. The iodine concentrations in the reactor coolant will be based upon preaccident and accident initiated iodine spikes.

1074v:1D/112087 43

MESTINGHOUSE PROPRIETARY CLASS 2 Accident Initiated Spike - The initial primary coolant iodine concentration is 1 yCi/gm of Dose Equivalent (D.E.) I-131.

Following the primary system depressurization associated with the SGTR, an iodine spike is initiated in the primary system which increases the iodine release rate from the fuel to the coolant to a value 500 times greater than the release rate corresponding to the initial primary system iodine concentration. The duration of the spike, [3.31 'ours, is sufficient to increase the initial RCS I-131 inventory by a factor of [100] '

ii. Preaccident Spike - A reactor transient has occured prior to the SGTR and has raised the primary coolant iodine concentration from 1 to 60 yCi/gram of D.E. I-131.

b. The initial secondary coolant iodine concentration is 0.1 yCi/gram of D.E. I-131.
c. The chemical form of iodine in the primary and secondary coolant is assumed to be elemental.

4 Dose Calculations The following assumptions and parameters were used to calculate the activity released to the atmosphere and the offsite doses following a SGTR.

1. The mass of reactor coolant discharged into the secondary system through the rupture and the mass of steam released from the intact and ruptured steam generators to the atmosphere are presented in Table II.5 and II.G.
2. The time dependent fraction of rupture flow that flashes to steam and is immediately released to the environment is presented in Figure III.1.
3. The time dependent iodine removal efficiency for scrubbing of steam bubbles as'hey rise from the leak site [(assumed to be at the top of the tube bundle)] 'o the water surface was also determined for each

,1 074v: 1 0/112087

MESTINGHOUSE PROPRIETARY CLASS 2 case., The iodine removal efficiency is determined by the. method suggested by Postma and Tam (Ref. 6). The iodine removal efficiencies are shown in Figure III.2.

4. The 0.2 gpm primary to secondary leak is assumed to be split evenly between the steam generators.
5. The iodine partition factor between the liquid and steam of the ruptured and intact steam generators is assumed to be 1DO.
6. No credit'as taken for radioactive decay during release and transport, or for cloud depletion by ground deposition during transport to the site boundary or outer boundary of the low population zone.
7. Short-term atmospheric dispersion factors (x/gs) for accident analysis and breathing rates are provided in Table III.4. The breathing rates were obtained from NRC Regulatory Guide 1.4, (Ref. 4).

Offsite Th roid Dose Calculation Model Offsite thyroid doses are calculated using the ~uation:

Th gtDCF,.

1 gJ

( IAR); . (BR) . (x/()) .

]

where

( IAR).. = integrated activity of isotope i released during'the 1J time interval j'n Ci>>

F

  • No credit is taken for cloud depletion by ground deposition or by radioactive decay during transport to the exclusion area boundary or to the outer boundary of the low-population zone.

1074v:1D/112087 45

WESTINGHOUSE PROPRIETARY CLASS 2 (BR) ~ breathing rate during time interval' in meter /second (Table III.4)

(x/Q)

J

= atmospheric dispersion factor during time interval j in second/meter (Table III.4)

(DCF).1 = thyroid dose conversion factor via inhalation for isotope i in rem/Ci (Table III.5) thyroid dose via inhalation in rem Results Thyroid doses at the Exclusion Area Boundary and Low Population Zone are presented in Table III.6. All doses are well within the allowable guidelines as specified by Standard Review Plan 15.6e3 and 10CFR100.

1074v:1D/112487 46

WESTINGHOUSE PROPRIETARY CLASS 2 TABLE I I I.1 PARAMETERS USED IN EVALUATING THE RADIOLOGICAL CONSEQUENCES OF A STEAM GENERATOR TUBE RUPTURE I. Source Data A. Core power level, MWt 1520 B. Total steam generator tube 0.2 leakage, prior to accident, gpm C. Reactor coolant iodine activity:

1. Accident Initiated Spike The initial RC iodine activities based on I

1

>Ci/gram of D.E. I-131 are presented in Table III.3. The iodine appearance rates assumed for the accident initiated spike are presented in Table III.2.

2, Pre-Accident Spike Primary coolant iodine activities based on 60 gCi/gram of D.E. I-131 are presented in Table I I I.3.,

D. Secondary system initial activity Dose equivalent of 0.1 yCi/gm of I-131, presented in Table III.3.

1074v:1D/112087 47

HESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.l (Sheet 2)

E. Reactor coolant mass, grams 1.27 x 10 F. Steam generator mass 3.39 x 10 (each), grams G. Offsite pow'er Lost at time of reactor trip H. Primar y-to-secondary leakage duration for intact SG, hrs.

I. Species of iodine 100 percent elemental II. Activity Release Data A. Faulted steam generator

1. Rupture flow See Table II.5 or II.G
2. Rupture flow flashing fraction See Figure III.1
3. Iodine scrubbing plus moisture See Figure III.2 separator removal efficiency
4. Total steam release, lbs See Table II.5 or II.G
5. Iodine partition factor
a. Prior to overfill 100
b. After overfill -1.0 - See Figure III.3
6. Location of tube rupture [Top of Bundle]

'074v:1 0/1120S7 48

MESTINGHOUSE.PROPRIETARY CLASS 2 TABLE III.1 (Sheet 3)

B. Intact steam generator

1. Primary-to-secondary leakage, gpm 0.1
2. Total steam release, lbs See Table 11.5 or 11.6
3. Iodine partition factor 100 C. Condenser
1. Iodine partition factor 100 D. Atmospheric Oispersion Factors See Table III,4 1074v:lo/112087 49

MESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.2 IODINE SPIKE APPEARANCE RATES (CURIES/SECOND) 1-132 3-133 I"134 0.94 2.22 1.74 3.07 1074v:1D/112087 50

MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II I.3 IODINE SPECIFIC ACTIVITIES IN (yCi/gm) THE PRIMARY AND SECONDARY COOLANT BASED ON 1, 60 AND 0.1 yCi/gram OF D.E. I-131

~Pi t 1 1 Secondar Coolant Nuclide ~luCD/ m 60 uCi/cDm 0,1 wCi/(1m 0.79 47.1 0.079 I-132 0.35 20.7 0. 035 1.01 60.7 0.101 0.20 12.2 0.020 I-135 0.79 47.1 0.079 1074v:1D/1 12087 51

MESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.4 ATMOSPHERIC DISPERSION FACTORS AND BREATHING RATES Time Exclusion Area Boundary Low Population Breathing 3 3 (hours) x/Q (Sec/m ) Zone x/Q (Sec/m ) Rate (m /Sec) [4]

0-2 4.8 x 10 3 x 10 3.47 x 10 2-8 3x10 3.47 x 10 1074v:1D/112087 52

WESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.5 THYROID DOSE CONVERSION FACTORS (Rem/Curie) [51 Nuclide

~ I-131 1.49 x 10 1.43 x 10 2.69 x 10 I-134 3.73 x 10 5.60 x 10 1074v:1D/112087 53

NESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.6 RESULTS Ooses Rem Allowable Case 1 Case 2 Guideline Value

l. Accident Initiated Iodine S ike Exclusion Area Boundary (0-2 hr.)

Thyroid 26.4 3.8 30 Low Population Zone (0-8 hr.)

Thyroid 1.7 0.3 30

2. Pre-Accident Iodine S ike Exclusion Area Boundary (0-2 hr.)

Thyroid 102.1 22.1 300, Low Population Zone (0-8 hr.)

Thyroid 6.4 1.4 300 ~

1074v:1D/112487 54

WESTINGHOUSE PROPRIETARY CLASS 2 GINN4 SGTR IS% TUBE PLUGGING - C4SE R4OIOLOGIC4L CONSEOUENCES EV4LU4TION BREAK FLOW FL4SNING FR4CTION

~ IS Case 1 e.

~ It ~ Si,tt & TIIC

~

Itttl tt ~ S4,lt ~ Si GINN4 SGTR ISZ TUBE PLUGGING CASE 2 R4O IGLOO I CAL CONSEOUENCES EVALUATION BREAK FLOW FLASHING FR4CTION

~ IS Case 2

~ It H,tt 14 Tlet

~

ItttI St SI,at ei Figure III.1 Break Flow Flashing Fraction 1 074 v:1D/112087 55

HESTINGHOUSE PROPRIETARY CLASS 2 GL,G CASE 1 o5

~ 2 0

8 1eee 1588 288 TINE (SECONDS) 4Z. (

~ 5 CASE 2

~ 2 V

M

'I 0

1088 1508 288 TINE ISECONDSI Figure III.2 Srubbing Efficiency 1 074 v:1D/112087

WESTINGHOUSE PROPRIETARY CLASS 2 CASE 1 IE+2 1E+1 2

0

~a C

<LE+8 1.5 ZIHE (HOURS)

CASE 2 JE+2 1E+1 2

0 C

C

+IE+8 TIHE (HOURS)

Figure III.3 Faulted SG Iodine Partition Factors 1074v:1D/112087 57

WESTINGHOUSE PROPRIETARY CLASS 2 IV. CONCLUSION The potential radiological consequences of a steam generator tube failure were evaluated for the R.E. Ginna nuclear power plant to demonstrate that the use of the Standard Technical Specification (STS) primary coolant activity limit of 1 yCi/gram of dose equivalent I-131 will result. in offsite doses that are within the appropriate guidelines, The mass releases for a design basis double ended rupture of a single tube with a loss of offsite power were conservatively calculated using the computer code LOFTTR2. Two cases were considered: [1) intact steam generator PORV fails closed and must be locally 1 opened, and 2) ruptured steam generator PORV fails open and must be locally isolated.] 'he analysis explicitly modeled the time needed for to perform the recovery steps outlined in guideline E-3 of Revision the'perators 1 of the Westinghouse Owners Group Emergency Response Guidelines. The resulting doses at the exclusion area boundary and low population zone are within the allowable guidelines as specified by Standard Review Plan 15.6.3 and 10CFR100. Consequently, the STS primary coolant activity limit is sufficiently low to ensure that the radiological consequences of a steam generator tube rupture at the R.E, Ginna plant will be within the guidelines.

1074v:1D/112087 58

HESTINGHOUSE PROPRIETARY CLASS 2 V. REFERENCES

1. Lewis, Huang, Behnke, Fittante, Gelman, "SGTR Analysis Methodology to Determine the Margin to Steam Generator Overfill," HCAP-10698-P-A, August 1987. [PROPRIETARY'.

Lewis, Huang, Rubin, "Evaluation of Offsite Radiation Doses for a Steam Generator Tube Rupture Accident," Supplement 1 to HCAP-10698-P-A, March 1986. [PROPRIETARY]

3. R. Elaisz, Letter from RGE to Hestinghouse concerning Ginna specific operator action times for SGTR analysis, February 7, 1985.
4. NRC Regulatory Guide 1.4, Rev. 2, "Assumptions Used for Evaluating the Potential Radiological Consequences of a LOCA for Pressurized Hater Reactors", Jun'e 1974.
5. NRC Regulatory Guide 1. 109, Rev. 1, "Calculation of Annual Doses to Man From Routine, Releases of Reactor Effluents for the Purpose of Evaluating Compliance with 10 CFR Part 50 Appendix I", October 1977.
6. Postma, A. K., Tam, P. S., "Iodine Behavior in a PHR Cooling System Following a Postulated Steam Generator Tube Rupture", NUREG-0409.

1074v:1D/120487 59

I ra V

0; J

ih