ML17309A575: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/20/1995
| issue date = 04/20/1995
| title = Rev 14 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant- Saturated Recovery Desired.
| title = Rev 14 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant- Saturated Recovery Desired.
| author name = MARLOW T A
| author name = Marlow T
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:EOP: ECA-3.2 T!TLE: SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV 14 PAGE 1 of 25 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER TECHNICAL REVIEW PORC REVIEW DATE PLANT SUPERINTENDENT W-ad-%EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:<C'r~~~v~U i 9504280023 950420 PDR ADOCK 05000244...P,,,PDR,~t, ou 0 (
{{#Wiki_filter:EOP:             T!TLE:
fw I E EOP: FCA-3.2 SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV 14 PAGE 2 of 25 A.PURPOSE-This procedure provides actions to cool down and depressurize the RCS to cold shutdown conditions while minimizing loss of RCS inventory and voiding in the RCS.B.ENTRY CONDITIONS/SYMPTOMS 1.ENTRY CONDITIONS
REV  14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2                    SATURATED RECOVERY DESIRED       PAGE 1 of 25 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER TECHNICAL REVIEW PORC REVIEW DATE PLANT SUPERINTENDENT Wad-%
-This procedure is entered from: a.ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT-SUBCOOLED RECOVERY DESIRED, when RWST level is low without a corresponding increase in containment sump level.b.ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT SUBCOOLED RECOVERY DESIRED, when the ruptured S/G level is high and plant staff selects saturated recovery method.
EFFECTIVE DATE CATEGORY   1.0 REVIEWED BY:
E gY 1(w EOP: ZCA-3.2 TITLE SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV 14 PAGE 3 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED*****************************************CAUTION IF RWST LEVEL DECREASES TO LESS THAN 28%, THEN THE SI SYSTEM SHOULD BE ALIGNED FOR COLD LEG RECIRCULATION USING ES-1.3, TRANSFER TO COLD LEG RECIRCULATION.
                    <C'r~~i
NOTE: o Steps 1 through 15 of ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT SUBCOOLED RECOVERY DESIRED, should be performed before continuing with this procedure.
                    ~v~U ou 9504280023 950420                                     0 PDR ADOCK 05000244                                       (
o FOLDOUT page should be open and monitored periodically.
    ...P   ,,         ,PDR, ~
o Adverse CNMT values should be used whenever CNMT pressure is greater than 4 psig or CNMT radiation is greater than 10+R/hr.1 Add Makeup To RWST As Necessary:
t,
o Refer to S-9J, BLENDING TO RWST-OR-o Refer to S-3.2D, TRANSFERRING WATER FROM CVCS HUT(S)TO RWST TO SFP-OR-o Refer to Attachment SFP-RWST I C g.g l EOP: RCA-3.2 TITLE: SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV: 14 PAGE 4 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED*****************************************CAUTION o IF OFFSITE POWER IS LOST AFTER SI RESET, THEN SELECTED SW PUMPS AND ONE CCW PUMP WILL AUTO START ON EMERGENCY D/G.MANUAL ACTION WILL BE REQUIRED TO RESTART SAFEGUARDS EQUIPMENT.
o RCS PRESSURE SHOULD BE MONITORED.
IF RCS PRESSURE DECREASES TO LESS THAN 250 PSIG[465 PSIG ADVERSE CNMT], THEN THE RHR PUMPS MUST BE MANUALLY RESTARTED TO SUPPLY WATER TO THE RCS.2 Check If RHR Pumps Should Be Stopped: a.Check RCS pressure: l)Pressure-GREATER THAN 250 psig[465 psig adverse CNMT]2)RCS pressure-STABLE OR INCREASING b.Stop RHR pumps and place in AUTO a.Go to Step 3.


EOP: ZCA-3.2 TITLE: SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV 14 PAGE 5 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED*****************************************CAUTION IF ANY RUPTURED S/G IS FAULTED, FEED FLOW TO THAT S/G SHOULD REMAIN ISOLATED DURING SUBSEQUENT RECOVERY ACTIONS UNLESS NEEDED FOR RCS COOLDOWN.*3 Monitor Ruptured S/G Level: a.Narrow range level-GREATER THAN 5%[25%adverse CNMT]a.IF ruptured S/G NOT faulted, THEN perform the following:
fw I E
l)Maintain feed flow to ruptured S/G until level greater than 5%[25%adverse CNMT].2)Continue with Step 4.WHEN ruptured S/G level greater than 5%[25%adverse CNMT], THEN do Steps 3b through e.b.Close MDAFW pump discharge valve to ruptured S/G~S/G A, MOV-4007~S/G B, MOV-4008 c.Pull stop MDAFW pump for ruptured S/G d.Close TDAFW pump flow control valve to ruptured S/G~S/G A, AOV-4297~S/G B, AOV-4298 e.Verify MDAFW pump crosstie valves-CLOSED b.Dispatch AO to locally close valve.d.Dispatch AO with locked valve key to locally close TDAFW pump manual feedwater isolation valve to ruptured S/G.~S/G A, V-4005~S/G B, V-4006 e.Manually close valves.~MOV-4000A~MOV-4000B
'4 EOP: ZCA-3 2 TITLE: L SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV 14 PAGE 6 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 4 Check If S/G Secondary Side Is Intact: o Pressure in both S/Gs-STABLE OR INCREASING IF any S/G pressure decreasing in an uncontrolled manner OR completely depressurized, THEN verify faulted S/G isolated unless needed for RCS cooldown: o Pressure in both S/Gs-GREATER THAN 100 PSIG~Steamlines
~Feedlines IF NOT, THEN go to E-2, FAULTED STEAM GENERATOR ISOLATION, Step 1.*****************************************CAUTION IF CST LEVEL DECREASES TO LESS THAN 5 FEET, THEN ALTERNATE WATER SOURCES FOR AFW PUMPS WILL BE NECESSARY (REFER TO ER-AFW.l, ALTERNATE WATER SUPPLY TO AFW PUMPS).NOTE: TDAFW pump flow control valves fail open on loss of IA.*5 Monitor Intact S/G Level: a.Narrow range level-GREATER THAN 5%[25%adverse CNMT]a.Maintain total feed'flow greater than 200 gpm until narrow range level greater than 5%[25%adverse CNMT]in at least one S/G.b.Control feed flow to maintain narrow range level between 17%[25%adverse CNMT]and 50%b.IF pa<row range level in the intact S/G continues to increase in an uncontrolled manner, THEN consider isolating unnecessary release paths:~TDAFW pump steam supply valves~S/G blowdown valves~Refer to Attachment RUPTURED S/G k t tf Lw EOP: ECA-3.2 SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV: 14 PAGE 7 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Shutdown margin should be monitored during RCS cooldown.Refer to Figure SDM.6 Initiate RCS Cooldown To Cold Shutdown: a.Establish and maintain cooldown rate in RCS cold legs-LESS THAN 100'F/HR b.Use RHR system if in service c.Dump steam to condenser from intact S/G c.Manually or locally dump steam using intact S/G ARV.IF no intact S/G available, THEN perform the following:
o Use faulted S/G.-OR-o IF RHR system NOT in service, THEN use ruptured S/G.7 Check RCS Subcooling Based On Core Exit T/Cs-GREATER THAN O'F USING FIGURE MIN SUBCOOLING Go to Step 19.8 Check Safeguards Pump Status o SI pumps-ANY RUNNING Go to Step 15.-OR-o RHR pumps-ANY RUNNING IN INJECTION MODE dp EOP: T"CA-3.2 TITLE SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV: 14 PAGE 8 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 9 Place PRZR Heater Switches In The Following Positions:
o PRZR heater control group-PULL STOP o PRZR heater backup group-OFF*****%***********************************I CAUTION VOIDING MAY OCCUR IN THE RCS DURING RCS DEPRESSURIZATION.
THIS WILL RESULT IN A RAPIDLY INCREASING PRZR LEVEL.NOTE: o, If auxiliary spray is in use, spray flow may be increased by closing normal charging valve AOV-294 and normal PRZR spray valves.o When using PRZR PORV, select one with an operable block valve.10 Depressurize RCS To Refill PRZR: a.Use normal PRZR spray valve associated with running RCP~PCV-431A for A RCP~PCV-431B for B RCP b.PRZR level-GREATER THAN 13%[40%adverse CNMT]c.Stop RCS depressurization a.Use one PRZR PORV.IF IA NOT available, THEN refer to Attachment N2 PORVS.IF no PORV available, THEN use auxiliary spray valve.b.Continue with Step ll.WHEN level greater than 13%[40%adverse CNMT], THEN stop RCS depressurization.
0\'" fO't FCA-3.2 TITLE: SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV: 14 PAGE 9 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED*****************************************CAUTION o IF RCP SEAL COOLING HAD PREVIOUSLY BEEN LOST, THEN THE AFFECTED RCP SHOULD NOT BE STARTED PRIOR TO A STATUS EVALUATION.
o INADVERTENT CRITICALITY MAY OCCUR FOLLOWING NATURAL CIRCULATION COOLDOWN IF THE RCP IN THE RUPTURED LOOP IS STARTED FIRST.ll Check If An RCP Should Be Started: a.Both RCPs-STOPPED b.RCS subcooling based on core exit T/Cs-GREATER THAN O'USING FIGURE MIN SUBCOOLING a.Stop all but one RCP and go to Step 12.b.Go to Step 19.c.PRZR level-GREATER THAN 13%[40%adverse CNMT]d.Try to start an RCP 1)Establish conditions for starting an RCP o Bus 11A or 11B energized o Refer to Attachment RCP START c.Return to Step 10.2)Start one RCP I v 0 Ep EOP: ,ECA-3.2 SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV: 14 PAGE 10 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 12 Check If One Of Three SI*Pumps Should Be Stopped: a.Three SI pumps-RUNNING b.RCS subcooling based on core exit T/Cs-GREATER THAN 10'F[10'F adverse CNMT]USING FIGURE MIN SUBCOOLING a.Go to Step 13.b.IF RCS hot leg temperatures greater than 320'F[310'F adverse CNMT]OR IF RHR normal cooling in service, THEN go to Step 19.IF RHR normal cooling NOT in service AND RCS hot leg temperatures less than 320'F[310'F adverse CNMT], THEN ensure at least one RHR pump running in injection mode and go to Step 12c.IF no RHR pump can be operated in injection mode, THEN go to Step 19.c.Check PRZR level-GREATER THAN 13%[40%adverse CNMT]c.Do NOT stop SI pump.Return to Step 10.d.Stop one SI pump


ECA-3.2 SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV 14 PAGE 11 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 13 Check If One Of Two SI Pumps Should Be Stopped: a.Two SI pumps-RUNNING b.RCS subcooling based on core exit T/Cs-GREATER THAN 35'F[35'F adverse CNMT]USING FIGURE MIN SUBCOOLING a.Go to Step 14.b.IF RCS hot leg temperatures greater than 320'F[310'F adverse CNMT]OR IF RHR normal cooling in service, THEN go to Step 19.IF RHR normal cooling NOT in service AND RCS hot leg temperatures less than 320'F[310'F adverse CNMT], THEN ensure at least one RHR pump running in injection mode and go to Step 13c.IF no RHR pump can be operated in injection mode, THEN go to Step 19.c.PRZR level-GREATER THAN 13%[40%adverse CNMT]d.Stop one SI pump c.Do NOT stop SI pump.Return to Step 10.
EOP:
a,l 0 T T.2 EOP: ECA-3.2 TITLES SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV: 14 PAGE 12 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 14 Check If Last SI Pump Should Be Stopped: a.One SI pump-RUNNING b.Determine required RCS subcooling from table: a.IF any RHR pump running in injection mode, THEN go to Step 19.IF NOT, THEN go to Step 15.Charging Pump Availability NONE ONE TWO THREE RCS Subcooling Criteria Insufficient subcooling to stop SI pump.215'F[215'F adverse CNMT]150'F[150'F adverse CNMT]80'F[80'F adverse CNMT]c.RCS subcooling based on core exit T/Cs-GREATER THAN VALUE FROM TABLE ABOVE USING FIGURE MIN SUBCOOLING c.IF RCS hot leg temperatures greater than 320'F[310'F adverse CNMT]OR IF RHR normal cooling in service, THEN go to Step 19.IF RHR normal cooling NOT in service AND RCS hot leg temperatures less than 320'F[310'F adverse CNMT), THEN ensure at least one RHR pump running in injection mode and go to Step 14d.IF no RHR pump can be operated in injection mode, THEN go to Step 19.d.PRZR level-GREATER THAN 13%[40%adverse CNMT]e.Stop running SI pump d.Do NOT stop SI pump.Return to Step 10.
REV  14 SGTR WITH LOSS OF REACTOR COOLANT FCA-3.2             SATURATED RECOVERY DESIRED PAGE of 25 A. PURPOSE  This procedure provides actions to cool down and depressurize the RCS to cold shutdown conditions while minimizing loss of RCS inventory and voiding in the RCS.
t'4 EOP: ECA-3.2 I SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV 14 PAGE 13 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 15 Check If Charging Flow Should Be Controlled To Maintain RCS Inventory:
B. ENTRY CONDITIONS/SYMPTOMS
a.Check RHR pumps-RUNNING IN INJECTION MODE a.Perform the following:
: 1. ENTRY CONDITIONS  This  procedure  is entered from:
1)Control charging flow to maintain RCS inventory:
: a. ECA-3.1,  SGTR WITH LOSS OF REACTOR COOLANT-SUBCOOLED RECOVERY DESIRED, when RWST    level is  low without a corresponding increase  in containment sump level.
o RVLIS level (no RCPs)BETWEEN 68%AND 73%[73%AND 76%adverse CNMT]-OR-o RVLIS fluid fraction (any RCP running)-BETWEEN 80%AND 90%b.Go to Step 19 2)Go.to Step 16.
: b. ECA-3.1,  SGTR WITH LOSS OF REACTOR COOLANT SUBCOOLED RECOVERY DESIRED, when the ruptured S/G  level is high and plant  staff selects saturated recovery method.
A l, C EOP: ECA-3.2 TITLE: SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV 14 PAGE 14 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED*****************************************CAUTION o IF RCP SEAL COOLING HAD PREVIOUSLY BEEN LOST, THEN THE AFFECTED RCP SHOULD NOT BE STARTED PRIOR TO A STATUS EVALUATION.
o INADVERTENT CRITICALITY MAY OCCUR FOLLOWING NATURAL CIRCULATION COOLDOWN IF THE RCP IN THE RUPTURED LOOP IS STARTED FIRST.16 Check RCP Status: a.RCPs-AT LEAST ONE RUNNING a.Perform the following:
1)Establish conditions for starting an RCP: o Verify bus 11A or 11B energized.
o Refer to Attachment RCP START.2)Start one RCP.IF an RCP can NOT be started, THEN verify natural circulation (Refer to Attachment NC).IF natural circulation NOT verified,'HEN increase dumping steam b.Stop all but one RCP
~')
EOP: ECA-3.2 TITLE: SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV: 14 PAGE 15 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED*****************************************CAUTION o VOIDING MAY OCCUR IN THE RCS DURING RCS DEPRESSURIZATION.
THIS WILL RESULT IN A RAPIDLY INCREASING PRZR LEVEL.o IF SI HAS BEEN TERMINATED, THE ACCUMS SHOULD BE ISOLATED PRIOR TO DEPRESSURIZING THE RCS TO LESS THAN 1000 PSIG.NOTE: o If auxiliary spray is in use, spray flow may be increased by closing normal charging valve AOV-294 and normal PRZR spray valves.o When using PRZR PORV, select one with an operable block valve.C 17 Depressurize RCS To Saturation At Core Exit: a.Determine saturation pressure for core exit T/Cs using Figure TSAT b.Use normal PRZR spray valves associated with running RCP~PCV-431A for A RCP~PCV-431B for B RCP c.Energize PRZR heaters as necessary d.Depressurize RCS until EITHER of the following conditions satisfied:
b.Use one PRZR PORV.IF IA NOT available, THEN refer to Attachment N2 PORVS.IF PORV NOT available, THEN use auxiliary spray valve (AOV-296).
o PRZR level-GREATER THAN 75%[65%adverse CNMT)-OR-o RCS pressure-AT SATURATION FROM STEP 17a


EOP: ECA-3.2 SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV: 14 PAGE 16 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 18 Verify Adequate Shutdown Margin a.Direct RP to sample RCS and ruptured S/G for boron concentration b.Verify boron concentration-GREATER THAN REQUIREMENTS OF FIGURE SDM b.Borate as necessary.
E gY 1( w
*19 Monitor SZ Reinitiation Criteria: a.Core exit T/Cs-DECREASING b.Check RVLIS indication:
o Level (no RCPs)-GREATER THAN 68%[73%adverse CNMTj-OR-a.Increase dumping steam.IF core exit T/Cs do NOT decrease, THEN manually operate SI pumps as necessary.
b.Manually operate SI pumps as necessary.
o Fluid Fraction (any RCP running)-GREATER THAN 80%
pa~y~y EOP: ECA-3.2 SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV: 14 PAGE 17 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 20 Check If SI ACCUMs Should Be Isolated: a.RCS subcooling based on core exit T/Cs-GREATER THAN O'USING FIGURE MIN SUBCOOLING a.IF both RCS hot leg temperatures less than 400'F, THEN go to Step 20c.IF NOT, THEN go to Step 21.b.PRZR level-GREATER THAN 5%[30%adverse CNMT]c.Dispatch AO with locked valve key to locally close breakers for SI ACCUM discharge valves~MOV-841, MCC C position 12F~MOV-865, MCC D position 12C d.Close SI ACCUM discharge valves~MOV-841~MOV-865 b.Return to Step 10.d.Vent any unisolated ACCUMs: 1)Open vent valves for unisolated SI ACCUMs.~ACCUM A, AOV-834A~ACCUM B, AOV-834B e.Locally reopen breakers for MOV-841 and MOV-865 2)Open HCV-945.
EOP:.ECA-3.2 TITLE: SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV 14 PAGE 18 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 21 Check If Emergency D/Gs Should Be Stopped: a.Verify AC emergency busses energized by offsite power: o Emergency D/G output breakers OPEN a.Try to restore offsite power (Refer to ER-ELEC.1, RESTORATION OF OFFSITE POWER).o AC emergency bus voltage GREATER THAN 420 VOLTS o AC emergency bus normal feed breakers-CLOSED b.Stop any unloaded emergency D/G and place in standby (Refer to Attachment D/G STOP)22 Minimize Secondary System Contamination:
a.Isolate reject from hotwell to CST'Place hotwell level controller (HC-107)in MANUAL at 50%a.IF hotwell level, increasing, THEN direct RP to sample hotwells for activity.o Verify hotwell level-STABLE b.Verify local actions to complete isolation of ruptured S/G (Refer to Attachment RUPTURED S/G)
!l'4 E,%V EOP: ECA-3'TITLE: SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV 14 PAGE 19 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 23 Verify Adequate SW Flow To CCW Hx: a.Verify at least two SW pumps RUNNING'.Verify AUX BLDG SW isolation valves-OPEN~MOV-4615 and MOV-4734~MOV-4616 and MOV-4735 a.Manually start pumps as power supply permits (258 kw per pump).IF less than two SW pumps can be operated, THEN go to Step 24.b.Establish SW to AUX BLDG (Refer to Attachment AUX BLDG SW).c.Verify CNMT RECIRC fan annunciator C-2, HIGH TEMPERATURE ALARM-EXTINGUISHED c.Dispatch AO to locally throttle flow to CCW Hx to between 5000 gpm and 6000 gpm total flow.24 Check RCP Cooling a.Check CCW to RCPs Establish normal cooling to RCPs (Refer to Attachment SEAL COOLING).o Annunciator A-7, RCP lA CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED o Annunciator A-15, RCP 1B CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED b.Check RCP seal injection o Labyrinth seal D/Ps-GREATER THAN 15 INCHES OF WATER-OR-o RCP seal injection flow to each RCP-GREATER THAN 6 GPM C
EOP: ECA-3.2 TITLE: SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV 14 PAGE 20 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 25 Check If Seal Return Flow Should Be Established:
a.Verify instrument bus D-ENERGIZED b.Verify RCP&#xb9;1 seal outlet temperature
-LESS THAN 235'F c.Verify RCP seal outlet valves OPEN~AOV-270A~AOV-270B d.Reset both trains of XY relays for RCP seal return isolation valve MOV-313 e.Open RCP seal return isolation valve MOV-313 f.Verify RCP&#xb9;1 seal leakoff flow LESS THAN 5.5 GPM g.Verify RCP&#xb9;1 seal leakoff flow GREATER THAN 0.8 GPM a.Perform the following:
1)Ensure.steam dump mode control in MANUAL.2)Restore power to instrument bus D from MCC B or MCC A (maintenance supply).b.Go to Step 26.c.Manually open valves as necessary.
e.Perform the following:
1)Place MOV-313 switch to OPEN.2)Dispatch AO with key to RWST gate to locally open MOV-313 f.Perform the following:
1)Trip the affected RCP 2)Allow 3 minutes for pump coast down, THEN close the affected RCP seal discharge v'al've~RCP A, AOV-270A~RCP B, AOV-270B IF both RCP seal discharge valves are shut, THEN go to Step 26.g.Refer t'o AP-RCP.1, RCP SEAL MALFUNCTION.
I 0 EOP: iECA-3.2 TITLE: SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV 14 PAGE 21 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Adverse CNMT conditions or loss of forced air cooling may result in failure of NIS detectors.
26 Check If Source Range Detectors Should Be Energized:
a.Source range channels DEENERGIZED a.Go to Step 26e.b.Check intermediate range flux-EITHER CHANNEL LESS THAN 10 10 AMPS b.Perform the following:
1)IF neither intermediate range channel is decreasing, THEN initiate boration.2)Continue with Step 27.WHEN flux is LESS THAN 10 1 amps on any operable channel, THEN do Steps 26c, d and e.c.Check the following:
o Both intermediate range channels-LESS THAN 10 10 AMPS c.Continue with Step 27.WHEN either condition met, THEN do Steps 26d and e.-OR-o Greater than 20 minutes since reactor trip d.Verify source range detectors ENERGIZED d.Manually energize source range detectors by depressing P-6 permissive defeat pushbuttons (2 of 2).IF source ranges can NOT be restored, THEN refer to ER-NIS~1, SR MALFUNCTION and go to Step 27.e.Transfer Rk-45 recorder to one source range and one intermediate range channel lag<l'C~'0~'
EOP: ECA-3.2 TITLE: SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV 14 PAGE 22 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 27 Establish Normal Shutdown Alignment:
a.Check condenser-AVAILABLE a.Dispatch AO to perform Attachment SD-2.b.Perform the following:
o Open generator disconnects
~1G13A71~9X13A73 o Place voltage regulator to OFF o Open turbine drain valves o Rotate reheater steam supply controller cam to close valves o Place reheater dump valve switches to HAND o Stop all but one condensate pump c.Verify adequate Rx head cooling:.1)Check IA to CNMT-AVAILABLE 1)Go to Step 28.2)Verify at least one control rod shroud fan-RUNNING 2)Manually start one fan as power supply permits (45 kw)3)Verify one Rx compartment cooling fan-RUNNING 3)Perform the following:
o Dispatch AO to reset UV relays at MCC C and MCC D.o Manually start one fan as power supply permits (23 kw).d.Verify Attachment SD-1-COMPLETE
'
EOP: ZCA-3.2 TITLE: SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV 14 PAGE 23 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED*****************************************CAUTION FEED FLOW SHOULD NOT BE ESTABLISHED TO ANY RUPTURED S/G WHICH IS ALSO FAULTED UNLESS IT IS NEEDED FOR RCS COOLDOWN.*28 Monitor Ruptured S/G(s)Narrow Range Level-GREATER THAN 17%[254 adverse CNMT]Refill ruptured S/G to 67%[55%adverse CNMT]using feed flow.IF either of the following conditions occurs, THEN stop feed flow to ruptured S/G unless needed for RCS cooldown: o Ruptured S/G pressure decreases in an uncontrolled manner.-OR-o Ruptured S/G pressure increases to 1020 psig.*29 Monitor RCP Operation:
a.RCPs-ANY RUNNING b.Check the following:
o RCP 81 seal D/P-GREATER THAN 220 PSID a.Go to Step 30.b.Stop the affected RCP(s).o Check RCP seal leakage-WITHIN THE NORHAL OPERATING RANGE OF FIGURE RCP SEAL LEAKOFF 4's Mi ,p>'
EOP: ECA-3.2 TITLE: SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV: 14 PAGE 24 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 30 Check Condenser Steam Dump Available-CONDENSER VACUUM GREATER THAN 20 INCHES HG Use intact S/G ARV for RCS temperature control.31 Check If RHR Normal Cooling Can Be Established:
a.RCS cold leg temperature
-LESS THAN 350'F a.Go to Step 32.b.RCS pressure-LESS THAN 400 psig[300 psig adverse CNMT]c.Place letdown pressure controller in MANUAL CLOSED b.Go to Step 32.d.Check following valves-OPEN~AOV-371, letdown isolation valve~AOV-427, loop B cold leg to REGEN Hx~At least one letdown orifice valve (AOV-200A, AOV-200B, or AOV-202)d.Perform the following:
1)Reset both trains of XY relays for AOV-371 and AOV-427.2)Open AOV-371 and AOV-427.3)Open one letdown orifice valve.e.Verify pressure on PI-135-LESS THAN 400 PSIG e.Go to Step 32.f.Place RCS overpressure protection system in service (Refer to 0-7, ALIGNMENT AND OPERATION OF THE REACTOR VESSEL OVERPRESSURE PROTECTION SYSTEM)g.Consult TSC to determine if RHR normal cooling should be established using Attachment RHR COOL 0
EOP: 'ECA-3.2 SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV: 14 PAGE 25 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: This procedure should be continued while obtaining CNMT hydrogen sample in Step 32.32 Check CNMT Hydrogen Concentration:
a.Direct RP to start CNMT hydrogen monitors as necessary b.Hydrogen concentration
-LESS THAN 0.5%b.Consult TSC to determine if hydrogen recombiners should be placed in service.33 Check Core Exit T/Cs-LESS THAN 200'F Return to Step 2.34 Evaluate Long Term Plant Status: a.Maintain cold shutdown conditions b.Consult TSC-END-


EOP:%CA-3.2 SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV: 14 PAGE 1 of 1 ECA-3.2 APPENDIX LIST TITLE 1)RED PATH  
EOP:           TITLE SGTR WITH LOSS OF REACTOR COOLANT                  REV    14 ZCA-3.2                    SATURATED RECOVERY DESIRED PAGE 3    of 25 STEP      ACTION/EXPECTED RESPONSE              RESPONSE  NOT OBTAINED CAUTION IF RWST LEVEL DECREASES TO LESS THAN 28%, THEN THE SI SYSTEM SHOULD BE ALIGNED FOR COLD LEG RECIRCULATION USING ES-1.3, TRANSFER TO COLD LEG RECIRCULATION.
NOTE:  o  Steps  1 through  15 of ECA-3.1,  SGTR WITH LOSS OF REACTOR COOLANT SUBCOOLED RECOVERY DESIRED,    should be performed before continuing with this procedure.
o  FOLDOUT  page should be open and monitored    periodically.
o  Adverse  CNMT values should be used whenever CNMT pressure is greater than  4 psig or CNMT radiation is greater than 10+    R/hr.
1  Add Makeup To RWST As Necessary:
o  Refer to S-9J,  BLENDING TO RWST
                      -OR-o  Refer to S-3.2D,  TRANSFERRING WATER FROM CVCS HUT(S) TO RWST TO SFP
                      -OR-o  Refer to Attachment    SFP-RWST
 
I  C g.g l
 
EOP:              TITLE:
REV: 14 SGTR WITH LOSS OF REACTOR COOLANT RCA-3.2                      SATURATED RECOVERY DESIRED PAGE 4  of 25 STEP      ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED CAUTION o  IF OFFSITE  POWER  IS LOST AFTER SI RESET,  THEN SELECTED SW PUMPS AND ONE CCW PUMP  WILL AUTO START  ON EMERGENCY D/G. MANUAL ACTION WILL BE REQUIRED TO RESTART SAFEGUARDS EQUIPMENT.
o  RCS PRESSURE    SHOULD BE MONITORED. IF RCS  PRESSURE  DECREASES TO LESS THAN 250 PSIG [465 PSIG ADVERSE CNMT], THEN THE RHR        PUMPS MUST BE MANUALLY RESTARTED TO SUPPLY WATER TO THE RCS.
2 Check Stopped:
If RHR    Pumps  Should  Be
: a. Check  RCS  pressure:                    a. Go  to Step 3.
l) Pressure  - GREATER THAN 250  psig [465 psig adverse CNMT]
: 2) RCS  pressure  - STABLE OR INCREASING
: b. Stop  RHR pumps    and place in AUTO
 
EOP:              TITLE:
REV    14 SGTR WITH LOSS OF REACTOR COOLANT ZCA-3.2                        SATURATED RECOVERY DESIRED PAGE 5    of 25 STEP      ACTION/EXPECTED RESPONSE                  RESPONSE NOT OBTAINED CAUTION IF ANY RUPTURED S/G IS FAULTED, FEED FLOW TO THAT S/G SHOULD REMAIN ISOLATED DURING SUBSEQUENT RECOVERY ACTIONS UNLESS NEEDED FOR RCS COOLDOWN.
* 3 Monitor Ruptured S/G Level:
: a. Narrow range      level  - GREATER        a. IF ruptured S/G    NOT faulted, THAN 5% [25%      adverse  CNMT]              THEN  perform the following:
l)  Maintain feed flow to ruptured S/G until level greater than 5% [25% adverse CNMT].
: 2) Continue    with Step 4. WHEN ruptured  S/G level greater than  5%  [25% adverse CNMT],
THEN do  Steps 3b through e.
: b. Close  MDAFW pump    discharge valve      b. Dispatch    AO  to locally close to ruptured      S/G                            valve.
            ~ S/G A, MOV-4007
            ~ S/G B, MOV-4008
: c. Pull stop    MDAFW pump    for ruptured    S/G
: d. Close  TDAFW pump    flow control        d. Dispatch AO with locked valve valve to ruptured      S/G                    key to locally close TDAFW pump manual feedwater isolation valve
            ~ S/G A, AOV-4297                              to ruptured S/G.
            ~ S/G B, AOV-4298
                                                            ~ S/G A, V-4005
                                                            ~ S/G B, V-4006
: e. Verify MDAFW      pump  crosstie            e. Manually close valves.
valves    - CLOSED
            ~ MOV-4000A
            ~ MOV-4000B
 
'4 EOP:            TITLE:        L REV    14 SGTR WITH LOSS OF REACTOR COOLANT ZCA-3 2                        SATURATED RECOVERY DESIRED                          PAGE 6    of 25 STEP      ACTION/EXPECTED RESPONSE                  RESPONSE    NOT OBTAINED 4  Check  If S/G Is Intact:
Secondary Side            IF any S/G pressure decreasing in an  uncontrolled manner OR completely depressurized, THEN o  Pressure    in both  S/Gs - STABLE        verify faulted S/G isolated unless OR INCREASING                              needed    for  RCS cooldown:
o  Pressure    in both  S/Gs - GREATER      ~  Steamlines THAN 100 PSIG                              ~  Feedlines IF  NOT, THEN go to E-2, FAULTED STEAM GENERATOR ISOLATION, Step        1.
CAUTION IF CST LEVEL DECREASES TO LESS THAN 5 FEET, THEN ALTERNATE WATER SOURCES FOR AFW PUMPS WILL BE NECESSARY (REFER TO ER-AFW.l, ALTERNATE WATER SUPPLY TO AFW PUMPS).
NOTE:  TDAFW pump    flow control valves    fail open  on  loss of IA.
* 5  Monitor Intact S/G Level:
: a. Narrow range      level  - GREATER        a. Maintain    total  feed 'flow greater THAN 5%   [25% adverse    CNMT]              than 200    gpm until  narrow range level greater than 5% [25%
adverse CNMT] in at least one S/G.
: b. Control feed flow to maintain              b. IF pa<row range level in the narrow range level between 17%                  intact S/G continues to increase
[25%  adverse    CNMT]  and 50%              in  an uncontrolled manner,      THEN consider isolating unnecessary release paths:
                                                            ~ TDAFW pump    steam supply valves
                                                            ~ S/G  blowdown    valves
                                                            ~ Refer to Attachment      RUPTURED S/G
 
k t
tf Lw
 
EOP:
REV: 14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2                      SATURATED RECOVERY DESIRED                  PAGE 7  of 25 STEP      ACTION/EXPECTED RESPONSE          RESPONSE NOT OBTAINED NOTE:    Shutdown margin should be monitored during  RCS  cooldown. Refer to Figure  SDM.
6  Initiate    RCS  Cooldown To Cold Shutdown:
: a. Establish and maintain cooldown rate in  RCS  cold legs - LESS THAN  100'F/HR
: b. Use  RHR  system  if in service
: c. Dump  steam to condenser  from      c. Manually or locally dump steam intact  S/G                            using intact S/G ARV.
IF  no  intact  S/G available, THEN perform the following:
o  Use  faulted  S/G.
                                                                  -OR-o  IF  RHR  system NOT in service, THEN  use ruptured S/G.
7 Check RCS Subcooling Based On            Go  to Step 19.
Core Exit T/Cs  GREATER THAN O'F USING FIGURE MIN SUBCOOLING 8 Check Safeguards        Pump  Status    Go  to Step 15.
o  SI pumps -    ANY RUNNING
                        -OR-o RHR pumps    - ANY RUNNING IN INJECTION    MODE
 
dp EOP:              TITLE SGTR WITH LOSS OF REACTOR COOLANT                        REV: 14 T"CA-3 . 2 SATURATED RECOVERY DESIRED PAGE 8      of 25 STEP        ACTION/EXPECTED RESPONSE                  RESPONSE NOT OBTAINED 9  Place    PRZR    Heater Switches In The    Following Positions:
o  PRZR  heater control group      - PULL STOP o  PRZR  heater backup group      - OFF I
CAUTION VOIDING MAY OCCUR IN THE RCS DURING RCS DEPRESSURIZATION.            THIS WILL RESULT IN A RAPIDLY INCREASING PRZR LEVEL.
NOTE:    o,  If auxiliary spray      is in use, spray flow may  be increased by closing normal charging valve      AOV-294 and normal PRZR spray valves.
o  When  using  PRZR PORV,  select one with  an operable  block valve.
10  Depressurize        RCS  To    Refill PRZR:
: a. Use normal      PRZR spray valve              a. Use one  PRZR PORV. IF IA NOT associated with running RCP                      available,  THEN refer to Attachment N2 PORVS.
            ~  PCV-431A    for  A RCP
            ~  PCV-431B    for  B RCP                        IF no PORV  available,  THEN  use auxiliary spray valve.
: b. PRZR  level  - GREATER THAN 13%          b. Continue with Step    ll. WHEN
[40%  adverse  CNMT]                          level greater than  13%  [40%
adverse CNMT],  THEN  stop  RCS depressurization.
: c. Stop    RCS  depressurization
 
0
\ '"
fO' t
 
TITLE:
REV: 14 SGTR WITH LOSS OF REACTOR COOLANT FCA-3.2                        SATURATED RECOVERY DESIRED PAGE 9  of 25 STEP      ACTION/EXPECTED RESPONSE                  RESPONSE  NOT OBTAINED CAUTION o  IF RCP SEAL COOLING HAD PREVIOUSLY BEEN LOST, THEN THE AFFECTED RCP SHOULD NOT BE STARTED PRIOR TO A STATUS EVALUATION.
o  INADVERTENT CRITICALITY MAY OCCUR FOLLOWING NATURAL CIRCULATION COOLDOWN IF THE RCP IN THE RUPTURED LOOP IS STARTED FIRST.
ll Check Started:
If An RCP      Should  Be
: a. Both  RCPs    - STOPPED                    a. Stop all but one  RCP and go to Step 12.
: b. RCS  subcooling based on core              b. Go  to Step 19.
exit  T/Cs -    GREATER THAN O' USING FIGURE MIN SUBCOOLING
: c. PRZR  level    - GREATER THAN    13%      c. Return to Step 10.
[40%  adverse    CNMT]
: d. Try to    start  an  RCP
: 1)  Establish conditions for starting    an  RCP o    Bus 11A    or  11B energized o    Refer to Attachment    RCP START
: 2)  Start    one RCP
 
I v
0 Ep
 
EOP:
SGTR WITH LOSS OF REACTOR COOLANT REV: 14
  ,ECA-3.2                    SATURATED RECOVERY DESIRED PAGE 10  of 25 STEP      ACTION/EXPECTED RESPONSE          RESPONSE NOT OBTAINED 12 Check Pumps If One Should Of Three SI Be Stopped:
: a. Three SI pumps -  RUNNING          a. Go  to Step 13.
: b. RCS  subcooling based on core      b. IF  RCS hot leg temperatures exit  T/Cs - GREATER THAN 10'F          greater than 320'F [310'F
[10'F adverse CNMT] USING FIGURE        adverse CNMT] OR IF RHR normal MIN SUBCOOLING                          cooling in service, THEN go to Step 19.
IF RHR normal cooling NOT in service AND RCS hot leg temperatures less than 320'F
[310'F adverse CNMT], THEN ensure at  least one RHR pump running in injection mode and go to Step 12c. IF no RHR pump can be operated in injection mode, THEN go to Step 19.
: c. Check  PRZR  level - GREATER THAN  c. Do NOT  stop SI pump. Return to 13%  [40% adverse  CNMT]                Step 10.
: d. Stop one SI pump
 
REV    14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2                    SATURATED RECOVERY DESIRED PAGE 11  of 25 STEP      ACTION/EXPECTED RESPONSE            RESPONSE  NOT OBTAINED 13  Check Should IfBe OneStopped:
Of Two  SI Pumps
: a. Two  SI pumps -    RUNNING            a. Go  to Step 14.
: b. RCS  subcooling based on core        b. IF  RCS hot leg temperatures exit  T/Cs - GREATER THAN 35'F            greater than 320'F [310'F
[35'F adverse CNMT] USING FIGURE          adverse CNMT] OR IF RHR normal MIN SUBCOOLING                            cooling in service, THEN go to Step 19.
IF RHR normal cooling NOT in service AND RCS hot leg temperatures less than 320'F
[310'F adverse CNMT], THEN ensure at  least one RHR pump running in injection mode and go to Step 13c. IF no RHR pump can be operated in injection mode, THEN go to Step 19.
: c. PRZR  level    - GREATER THAN 13%    c. Do NOT  stop SI pump. Return to
[40%  adverse    CNMT]                    Step 10.
: d. Stop one SI pump
 
a,l 0 T
T.
2
 
EOP:              TITLES REV: 14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2                      SATURATED RECOVERY DESIRED PAGE 12  of 25 STEP      ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED 14  Check Be If Last Stopped:
SI  Pump  Should
: a. One SI pump - RUNNING                      a. IF any  RHR pump    running in injection  mode, THEN go    to Step 19. IF  NOT, THEN go    to Step 15.
: b. Determine required RCS subcooling from table:
Charging Pump                RCS  Subcooling Criteria Availability NONE              Insufficient subcooling to stop SI  pump.
ONE              215'F [215'F adverse  CNMT]
TWO              150'F [150'F adverse  CNMT]
THREE              80'F [80'F adverse  CNMT]
: c. RCS  subcooling based on core            c. IF  RCS hot leg temperatures exit T/Cs - GREATER THAN VALUE                greater than 320'F [310'F FROM TABLE ABOVE USING FIGURE                adverse CNMT] OR IF RHR normal MIN SUBCOOLING                                cooling in service, THEN go to Step 19.
IF RHR normal cooling NOT in service AND RCS hot leg temperatures less than 320'F
[310'F adverse CNMT), THEN ensure  at least one RHR pump running in injection mode and      go to Step 14d.      IF  no RHR pump can be operated    in  injection mode, THEN go  to Step 19.
: d. PRZR  level  - GREATER THAN 13%        d. Do NOT  stop SI pump. Return to
[40%  adverse  CNMT]                        Step 10.
: e. Stop running SI pump
 
t'4 EOP:
REV    14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2                    SATURATED RECOVERY DESIRED I
PAGE 13    of 25 STEP      ACTION/EXPECTED RESPONSE          RESPONSE  NOT OBTAINED 15    Check Be If Charging Controlled Flow Should To Maintain  RCS Inventory:
: a. Check RHR pumps  - RUNNING IN      a. Perform the  following:
INJECTION  MODE
: 1) Control charging flow to maintain  RCS  inventory:
o  RVLIS level  (no RCPs)
BETWEEN 68% AND 73% [73%
AND 76% adverse CNMT]
                                                                  -OR-o  RVLIS  fluid fraction  (any RCP running)  - BETWEEN 80%
AND 90%
: 2) Go. to Step 16.
: b. Go to Step  19
 
A l,
C
 
EOP:            TITLE:
REV    14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2                    SATURATED RECOVERY DESIRED PAGE 14    of 25 STEP      ACTION/EXPECTED RESPONSE            RESPONSE  NOT OBTAINED CAUTION o  IF RCP SEAL COOLING HAD PREVIOUSLY BEEN LOST, THEN THE AFFECTED RCP SHOULD NOT BE STARTED PRIOR TO A STATUS EVALUATION.
o  INADVERTENT CRITICALITY MAY OCCUR FOLLOWING NATURAL CIRCULATION COOLDOWN IF THE RCP IN THE RUPTURED LOOP IS STARTED FIRST.
16  Check RCP    Status:
: a. RCPs  - AT LEAST ONE RUNNING        a. Perform the    following:
: 1) Establish conditions    for starting an RCP:
o  Verify bus  11A or  11B energized.
o  Refer to Attachment    RCP START.
: 2)  Start  one RCP.
IF an  RCP  can NOT  be started, THEN  verify natural circulation (Refer to Attachment NC).
IF natural circulation    NOT verified,'HEN increase      dumping steam
: b. Stop all  but one RCP
 
~
  ')
 
EOP:            TITLE:
SGTR WITH LOSS OF REACTOR COOLANT                        REV: 14 ECA-3.2                        SATURATED RECOVERY DESIRED PAGE 15    of 25 STEP      ACTION/EXPECTED RESPONSE                  RESPONSE  NOT OBTAINED CAUTION o  VOIDING MAY OCCUR IN THE RCS DURING RCS DEPRESSURIZATION.            THIS WILL RESULT IN A RAPIDLY INCREASING PRZR LEVEL.
o  IF SI HAS BEEN TERMINATED, THE ACCUMS SHOULD BE ISOLATED PRIOR TO DEPRESSURIZING THE RCS TO LESS THAN 1000 PSIG.
NOTE:  o  If auxiliary spray        is in use, spray flow may  be increased by closing normal charging valve        AOV-294 and normal PRZR spray valves.
o  When  using    PRZR PORV,  select  one with  an operable  block valve.
C 17  Depressurize        RCS  To Saturation At Core Exit:
: a. Determine saturation pressure for core exit T/Cs using Figure TSAT
: b. Use normal PRZR spray valves                b. Use one  PRZR PORV. IF IA NOT associated with running RCP                    available,  THEN refer to Attachment N2 PORVS.
          ~ PCV-431A    for    A RCP
          ~ PCV-431B    for    B RCP                      IF PORV NOT  available,  THEN use auxiliary spray valve    (AOV-296).
: c. Energize    PRZR  heaters as necessary
: d. Depressurize      RCS  until  EITHER  of the following conditions satisfied:
o  PRZR  level    - GREATER THAN 75%
[65% adverse      CNMT)
                          -OR-o  RCS pressure      - AT SATURATION FROM STEP 17a
 
EOP:
REV: 14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2                    SATURATED RECOVERY DESIRED                PAGE 16  of 25 STEP      ACTION/EXPECTED RESPONSE          RESPONSE  NOT OBTAINED 18  Verify Adequate      Shutdown Margin
: a. Direct  RP to sample RCS and ruptured S/G for boron concentration
: b. Verify boron concentration-        b. Borate as necessary.
GREATER THAN REQUIREMENTS OF FIGURE SDM
*19    Monitor    SZ  Reinitiation Criteria:
: a. Core exit  T/Cs - DECREASING        a. Increase dumping steam.
IF core exit T/Cs do NOT decrease, THEN manually operate SI pumps as necessary.
: b. Check RVLIS indication:            b. Manually operate SI  pumps as necessary.
o  Level (no  RCPs) - GREATER THAN 68% [73% adverse CNMTj
                        -OR-o  Fluid Fraction (any  RCP running)  - GREATER THAN 80%
 
pa~ y
~y
 
EOP:
REV: 14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2                      SATURATED RECOVERY DESIRED                  PAGE 17  of 25 STEP      ACTION/EXPECTED RESPONSE            RESPONSE  NOT OBTAINED 20    Check Isolated:
If SI  ACCUMs    Should Be
: a. RCS  subcooling based on core        a. IF both  RCS hot leg temperatures exit  T/Cs -  GREATER THAN O'          less than 400'F, THEN go to USING FIGURE MIN SUBCOOLING              Step 20c.
IF  NOT, THEN go  to Step 21.
: b. PRZR  level  - GREATER THAN  5%    b. Return to Step 10.
[30%  adverse  CNMT]
: c. Dispatch AO with locked valve key to locally close breakers for SI ACCUM discharge valves
            ~ MOV-841,  MCC C  position  12F
            ~ MOV-865,  MCC D  position  12C
: d. Close SI  ACCUM  discharge valves  d. Vent any unisolated    ACCUMs:
            ~ MOV-841                                1) Open vent valves  for
            ~ MOV-865                                    unisolated SI  ACCUMs.
                                                          ~ ACCUM  A, AOV-834A
                                                          ~ ACCUM  B, AOV-834B
: 2) Open HCV-945.
: e. Locally reopen breakers    for MOV-841 and MOV-865
 
EOP:            TITLE:
REV    14 SGTR WITH LOSS OF REACTOR COOLANT
  .ECA-3.2                      SATURATED RECOVERY DESIRED                PAGE 18  of 25 STEP      ACTION/EXPECTED RESPONSE            RESPONSE NOT OBTAINED 21  Check  If Emergency Should Be Stopped:
D/Gs
: a. Verify AC    emergency busses        a. Try to restore offsite power energized by    offsite power:            (Refer to ER-ELEC.1, RESTORATION OF OFFSITE POWER).
o  Emergency D/G output breakers OPEN o  AC emergency    bus voltage GREATER THAN    420 VOLTS o  AC  emergency bus normal feed breakers    - CLOSED
: b. Stop any unloaded emergency D/G and place in standby (Refer to Attachment D/G STOP) 22  Minimize Secondary System Contamination:
: a. Isolate reject from hotwell to        a. IF hotwell level, increasing, CST'                                      THEN direct RP to sample hotwells for activity.
Place hotwell    level controller  (HC-107)  in MANUAL at 50%
o  Verify hotwell level    - STABLE
: b. Verify local actions to complete isolation of ruptured S/G (Refer to Attachment RUPTURED S/G)
 
! l' 4
E,%
V
 
EOP:              TITLE:
REV    14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3 '                          SATURATED RECOVERY DESIRED                PAGE 19    of 25 STEP      ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED 23  Verify Adequate          SW  Flow To CCW  Hx:
: a. Verify at least      two  SW pumps      a. Manually  start pumps as power RUNNING                                      supply permits (258 kw per pump). IF less than two SW pumps can be operated, THEN  go to Step 24.
Verify AUX BLDG      SW  isolation      b. Establish SW to AUX BLDG (Refer valves  - OPEN                              to Attachment AUX BLDG SW).
            ~ MOV-4615 and MOV-4734
            ~ MOV-4616 and MOV-4735
: c. Verify CNMT RECIRC fan                  c. Dispatch AO to locally throttle annunciator C-2, HIGH                        flow to CCW Hx to between TEMPERATURE ALARM - EXTINGUISHED            5000 gpm and 6000 gpm  total flow.
24  Check RCP Cooling                            Establish normal cooling to RCPs (Refer to Attachment SEAL COOLING).
: a. Check  CCW    to  RCPs o  Annunciator A-7,        RCP lA CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED o  Annunciator A-15,        RCP 1B CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED
: b. Check  RCP    seal injection o  Labyrinth seal D/Ps        - GREATER THAN 15 INCHES OF WATER
                            -OR-o  RCP  seal injection flow to each    RCP  - GREATER THAN 6  GPM
 
C EOP:              TITLE:
REV    14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2                        SATURATED RECOVERY DESIRED                  PAGE 20  of 25 STEP      ACTION/EXPECTED RESPONSE              RESPONSE  NOT OBTAINED 25    Check    If  Seal Return Flow Should Be Established:
: a. Verify instrument bus D-                a. Perform the following:
ENERGIZED
: 1) Ensure. steam dump mode control in  MANUAL.
: 2) Restore power to instrument bus D from MCC B or MCC A (maintenance  supply).
: b. Verify RCP &#xb9;1 seal      outlet        b. Go to Step 26.
temperature - LESS      THAN 235 'F
: c. Verify    RCP  seal outlet valves      c. Manually open valves as OPEN                                      necessary.
            ~ AOV-270A
            ~ AOV-270B
: d. Reset both      trains of XY relays for  RCP  seal return isolation valve  MOV-313
: e. Open  RCP    seal return isolation    e. Perform the    following:
valve  MOV-313
: 1) Place MOV-313 switch to OPEN.
: 2) Dispatch  AO with key to  RWST gate to  locally open MOV-313
: f. Verify RCP      &#xb9;1 seal leakoff flow    f. Perform the following:
LESS THAN    5.5  GPM
: 1) Trip the affected    RCP
: 2) Allow  3 minutes for pump coast down, THEN close the affected RCP seal discharge v'al've
                                                            ~ RCP A, AOV-270A
                                                            ~ RCP B, AOV-270B IF both RCP seal discharge valves are shut, THEN go to Step 26.
: g. Verify RCP &#xb9;1 seal leakoff flow        g. Refer t'o AP-RCP.1,  RCP SEAL GREATER THAN      0.8  GPM              MALFUNCTION.
 
I 0
 
EOP:            TITLE:
REV    14 SGTR WITH LOSS OF REACTOR COOLANT iECA-3.2                    SATURATED RECOVERY DESIRED PAGE 21      of 25 STEP      ACTION/EXPECTED RESPONSE              RESPONSE    NOT OBTAINED NOTE:  Adverse  CNMT conditions or loss of forced air cooling    may result in failure of  NIS  detectors.
26  Check    If Source Detectors Should Range Be  Energized:
: a. Source range channels                  a. Go to Step 26e.
DEENERGIZED
: b. Check intermediate range    flux-    b. Perform the following:
EITHER CHANNEL LESS THAN 10 10 AMPS                                1) IF  neither intermediate range channel    is decreasing,  THEN initiate boration.
: 2) Continue    with Step 27. WHEN flux is  LESS THAN 10 1    amps on any operable    channel,  THEN do Steps 26c, d and e.
: c. Check the following:                  c. Continue with Step 27.        WHEN either condition met,    THEN do o  Both intermediate range                Steps 26d and e.
channels - LESS THAN 10 10 AMPS
                        -OR-o  Greater than    20 minutes  since reactor  trip
: d. Verify source range detectors          d. Manually energize source range ENERGIZED                                  detectors by depressing P-6 permissive defeat pushbuttons (2 of 2).
IF source ranges can NOT      be restored, THEN refer to ER-NIS 1, SR MALFUNCTION and go
                                                              ~
to Step 27.
: e. Transfer Rk-45 recorder to one source range and one intermediate range channel
 
lag
      ~'
<l'C~
'0
 
EOP:            TITLE:
REV    14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2                      SATURATED RECOVERY DESIRED PAGE 22  of 25 STEP      ACTION/EXPECTED RESPONSE              RESPONSE  NOT OBTAINED 27  Establish Normal Shutdown Alignment:
: a. Check condenser    - AVAILABLE        a. Dispatch AO to perform Attachment SD-2.
: b. Perform the following:
o  Open  generator disconnects
              ~  1G13A71
              ~  9X13A73 o  Place voltage regulator to      OFF o  Open  turbine drain valves o  Rotate reheater steam supply controller cam to close valves o  Place reheater dump valve switches to HAND o  Stop  all  but  one condensate pump
: c. Verify adequate    Rx head  cooling:.
: 1) Check IA to    CNMT  - AVAILABLE        1)  Go to Step 28.
: 2) Verify at least    one control        2) Manually start one fan as rod shroud fan    - RUNNING                power supply permits (45 kw)
: 3) Verify one  Rx compartment            3) Perform the  following:
cooling  fan - RUNNING o  Dispatch  AO  to reset  UV relays at  MCC C  and  MCC D.
o  Manually start one fan as power supply permits (23 kw).
: d. Verify Attachment    SD COMPLETE
 
EOP:            TITLE:
SGTR WITH LOSS OF REACTOR COOLANT                        REV    14 ZCA-3. 2                  SATURATED RECOVERY DESIRED PAGE 23    of 25 STEP      ACTION/EXPECTED RESPONSE            RESPONSE  NOT OBTAINED CAUTION FEED FLOW SHOULD NOT BE ESTABLISHED TO ANY RUPTURED S/G WHICH      IS  ALSO FAULTED UNLESS IT IS NEEDED FOR RCS COOLDOWN.
*28    Monitor Ruptured S/G(s)                  Refill ruptured    S/G  to  67%  [55%
Narrow Range Level  GREATER            adverse  CNMT]  using feed flow.
THAN 17%    [254 adverse  CNMT]
IF either of the following conditions occurs, THEN stop feed flow to ruptured S/G unless needed for  RCS  cooldown:
o  Ruptured S/G pressure decreases in an  uncontrolled manner.
                                                                -OR-o  Ruptured S/G pressure      increases to 1020  psig.
*29    Monitor  RCP  Operation:
: a. RCPs - ANY RUNNING                    a. Go to Step 30.
: b. Check the following:                  b. Stop the affected RCP(s).
o  RCP  81 seal D/P - GREATER THAN 220 PSID o  Check RCP seal leakage-WITHIN THE NORHAL OPERATING RANGE OF FIGURE RCP SEAL LEAKOFF
 
4's Mi
,p
 
EOP:              TITLE:
REV: 14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2                      SATURATED RECOVERY DESIRED PAGE 24 of 25 STEP        ACTION/EXPECTED RESPONSE            RESPONSE  NOT OBTAINED 30  Check Condenser        Steam Dump        Use  intact  S/G ARV for RCS Available        CONDENSER VACUUM        temperature control.
GREATER THAN 20 INCHES HG 31  Check Can Be IfEstablished:
RHR Normal    Cooling
: a. RCS  cold leg temperature -    LESS  a. Go to Step 32.
THAN  350'F
: b. RCS  pressure  - LESS THAN          b. Go to Step 32.
400 psig [300 psig adverse      CNMT]
: c. Place letdown pressure controller in    MANUAL CLOSED
: d. Check    following valves    - OPEN    d. Perform the  following:
            ~ AOV-371, letdown    isolation          1) Reset both  trains of XY valve                                      relays for  AOV-371 and
            ~ AOV-427, loop    B  cold leg to            AOV-427.
REGEN Hx
            ~ At least one letdown orifice            2) Open AOV-371 and AOV-427.
valve (AOV-200A, AOV-200B, or AOV-202)                                3) Open one letdown  orifice valve.
: e. Verify pressure    on PI-135 - LESS  e. Go to Step 32.
THAN 400 PSIG
: f. Place  RCS  overpressure protection system in service (Refer to 0-7,    ALIGNMENT AND OPERATION OF THE REACTOR VESSEL OVERPRESSURE PROTECTION SYSTEM)
: g. Consult TSC to determine      if RHR normal cooling should be established using Attachment RHR COOL
 
0 EOP:
REV: 14 SGTR WITH LOSS OF REACTOR COOLANT
  'ECA-3.2                    SATURATED RECOVERY DESIRED PAGE 25 of 25 STEP      ACTION/EXPECTED RESPONSE              RESPONSE  NOT OBTAINED NOTE:    This procedure should be continued while obtaining    CNMT hydrogen sample  in Step 32.
32    Check  CNMT  Hydrogen Concentration:
: a. Direct  RP to start CNMT hydrogen monitors as necessary
: b. Hydrogen concentration  - LESS        b. Consult  TSC to determine if THAN 0.5%                                  hydrogen recombiners should be placed in service.
33    Check Core    Exit  T/Cs  LESS          Return to Step 2.
THAN  200'F 34    Evaluate Long Term Plant Status:
: a. Maintain cold shutdown conditions
: b. Consult  TSC
                                              -END-
 
EOP:
REV: 14 SGTR WITH LOSS OF REACTOR COOLANT
  %CA-3.2            SATURATED RECOVERY DESIRED    PAGE 1 of 1 ECA-3.2 APPENDIX LIST TITLE                             PAGES
: 1) RED PATH  


==SUMMARY==
==SUMMARY==
2)FIGURE MIN SUBCOOLING 3)FIGURE SDM 4)FIGURE TSAT 5)FIGURE RCP SEAL LEAKOFF 6)ATTACHMENT SFP-RWST 7)ATTACHMENT N2 PORVS 8)ATTACHMENT NC 9)ATTACHMENT SEAL COOLING 10)ATTACHMENT RCP START 11)ATTACHMENT D/G STOP 12)ATTACHMENT AUX BLDG SW 13)ATTACHMENT RUPTURED S/G 14)ATTACHMENT SD-1 15)ATTACHMENT SD-2 16)ATTACHMENT RHR COOL 17)FOLDOUT PAGES h\gt 1<I,tt l1 I I EOP: ECA-3.2 SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV: 14 PAGE 1 of 1 RED PATH  
: 2) FIGURE MIN SUBCOOLING
: 3) FIGURE SDM
: 4) FIGURE TSAT
: 5) FIGURE RCP SEAL LEAKOFF
: 6) ATTACHMENT SFP-RWST
: 7) ATTACHMENT N2 PORVS
: 8) ATTACHMENT NC
: 9) ATTACHMENT SEAL COOLING
: 10) ATTACHMENT RCP START
: 11) ATTACHMENT D/G STOP
: 12) ATTACHMENT AUX BLDG SW
: 13) ATTACHMENT RUPTURED S/G
: 14) ATTACHMENT SD-1
: 15) ATTACHMENT SD-2
: 16) ATTACHMENT RHR COOL
: 17) FOLDOUT
 
h \
gt     1<
I,tt l1   I I
 
EOP:
SGTR WITH LOSS OF REACTOR COOLANT REV: 14 ECA-3.2                SATURATED RECOVERY DESIRED PAGE 1 of 1 RED PATH  


==SUMMARY==
==SUMMARY==
a.SUBCRITICALITY
: a. SUBCRITICALITY Nuclear power   greater than 5%
-Nuclear power greater than 5%b.CORE COOLING-Core exit T/Cs greater than 1200'F-OR-Core exit T/Cs greater than 700'F AND RVLIS level (no RCPs)less than 434[46%adverse CNMT]c.HEAT SINK-Narrow range level in all S/Gs less than 54[25%adverse CNMT]AND total feedwater flow less than 200 gpm d.INTEGRITY-Cold leg temperatures decrease greater than 100'F in last 60 minutes AND RCS cold leg temperature less than 285'F e.CONTAINMENT
: b. CORE COOLING   Core exit T/Cs greater than 1200'F
-CNMT pressure greater than 60 psig  
                                          -OR-Core exit T/Cs greater than 700'F AND RVLIS level (no RCPs) less than 434 [46%
'e rP 4I'I A'y k I 4 0 EOP: KCA-3.2 TITLE: SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV 14 PAGE 1 of 1 FIGURE MIN SUBCOOLING NOTE: Subcool'ing Margin=Saturation Temperature From Figure Belov[-]Core Exit T/C Indication RC 2500 2400 2300 2200 2100 2000 1900 1800 1700 1600 1500 1400 1300 1200 1100 1000 900 800 700 600 500 400 300 200 100 0 S PRESSURE (PSIG)RCS PRESSURE INCREMENTS 20 PSIG SUBCOOLED REGION NMT ADVERSE C NORMAL CNMT INADEQUATE SUBCOOL ING REGION TEMPERATURE INCREMENTS 10'F 200 250 300 350 400 450 500 550 600 650 700 CORE EXIT SATURATION TEMPERATURE (F)
adverse CNMT]
I~i<, Sw I J S+IS S lp E g ,'ii EOP: SCA-3.2 TITLE: SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV 14 PAGE 1 of 1 NOTE: FIGURE SDM o Curve includes allowance for one stuck rod.Add 100 ppm for each additional stuck rod.o To obtain core burnup, use PPCS point ID BURNUP.BORON CONCENTRATION (PPH)1800 1600 BORON INCREMENTS 20 PPM 1400 1200 1000 ADEQUATE SDH 100 PPH CONSERVATISM INCLUDED 800 600 400 200 BURNUP INCREMENTS 100 HWD/HTU 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 CYCLE 25 BURNUP (MWD/HTU)
: c. HEAT SINK Narrow range level in   all S/Gs less than 54
~1 p:4i'~~I''4'1 tpq sr~'
[25% adverse CNMT] AND   total feedwater flow less than 200 gpm
EOP: 'ECA-3.2 TITLE: SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV: 14 PAGE 1 of 1 FIGURE TSAT URATION PRESSURE (PSIG)SAT 2500 2400 2300 2200 2100 2000 1900 1800 1700 1600 1500 1400 1300 1200 1100 1000 900 800 700 600 500 400 300 200 100 0 20 PRESSURE INCREMENTS 20 PSIG TEMPERATURE INCREMENTS 10'F 0 250 300 350 400 450 500 550 600 650 700 CORE EXIT SATURATION TEMPERATURE
: d. INTEGRITY Cold   leg temperatures decrease greater than 100'F in last 60 minutes AND RCS cold leg temperature less than 285'F
(')
: e. CONTAINMENT CNMT   pressure greater than   60 psig
k'4 1~4~~~4 AQ f EOP:+CA-3.2 T!TLE SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV: 14 PAGE 1 of 1 FIGURE RCP SEAL LEAKOFF&#xb9;1 SEAL LEAK RATE (GPM)6 LEAK RATE INCREMENTS 0.2 GPM NORMAL OPERATING RANGE DP INCREMENTS 50 PSI 250 500 750 1000 1250 1500 1750 2000 2250 2500&#xb9;I SEAL DP (RCS PRESS-VCT PRESS)PSI A>>4~"
 
EOP:~ECA-3.2 TITLE: SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED REV 14 PAGE 1 of 1 FOLDOUT PAGE 1~SI REINITIATION CRITERIA IF EITHER condition listed below occurs, THEN manually operate SI pumps as necessary:
e rP 4I' I
o Core exit T/Cs-INCREASING-OR-o Check RVLIS indication:
A'y I k 4
Level (no RCPs)-LESS THAN 684[734 adverse CNMT]Fluid fraction (any RCP running)-LESS THAN 80%2~SECONDARY INTEGRITY CRITERIA IF any S/G pressure is decreasing in an uncontrolled manner or is completely depressurized, and has not been isolated, THEN go to E-2, FAULTED S/G ISOLATION, Step 1, unless faulted S/G needed for RCS cooldown.3.COLD LEG RECIRCULATION SWITCHOVER CRITERION IF RWST level decreases to less than 28%, THEN go to ES-1.3, TRANSFER TO COLD LEG RECIRCULATION, Step 1.4.LOSS OF EMERGENCY COOLANT RECIRCULATION CRITERION IF emergency coolant recirculation is established and subsequently lost, THEN go to ECA-1.1, JOSS OF EMERGENCY COOLANT RECIRCULATION,'Step 1.5.AFW SUPPLY SWITCHOVER CRITERION IF CST level decreases to less than 5 feet, THEN switch to alternate AFW water supply (Refer to ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS).
0
I n C*
EOP: ECA-3.3 TITLE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV 11 PAGE 1 of 27 RO ESTER GAS AND ELECTRIC CORPORATION GINNA STATION CON OLLED COPY NUMBER TEC ICAL REVIEW PORC REVIEW DATE PLANT UPERINTE ENT cg cg EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:
~i EOP: ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV: 11 PAGE 2 of 27 A.PURPOSE-This procedure provides actions for a SGTR with coincident loss of normal and auxiliary PRZR sprays and PORVs.B.ENTRY CONDITIONS/SYMPTOMS 1.ENTRY CONDITIONS
-This procedure is entered from: a.E-3, STEAM GENERATOR TUBE RUPTURE, when PRZR pressure control is not available.
~p lp eI lg Ot k P j b~
EOP: ECA-3.3 TITLE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV: 11 PAGE 3 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: o Foldout page should be open AND monitored periodically.
o Adverse CNMT values should be used whenever CNMT pressure is greater than 4 psig or CNMT radiation is greater than 10+R/hr.1 Check Ruptured S/G Narrow Range Level-LESS THAN 67:[55%adverse CNMT]Go to Step 8.2 Check RCP Status-AT LEAST ONE RUNNING Try to start one RCP: a.Establish conditions for starting RCP.o Bus 11A and Bus 11B energized o Refer to Attachment RCP START b.Start one RCP.IF no RCP can be started, THEN go to Step 4.3 Check IF Normal PRZR Spray Available:
a.Verify IA to CNMT-AVAILABLE a.Perform the following:
1)Place PRZR heater control group to PULL STOP.2)Place PRZR heater backup group to OFF.3)Place normal spray valve controllers to MANUAL at 0%.b.Go to E-3, STEAM GENERATOR TUBE RUPTURE, Step 21 4)Go to Step 4.
'be(m i.'J l~4 EOP: ECA-3.3 TITLE SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV: 11 PAGE 4 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 4 Try To Restore PRZR PORV: a.Block valves-AT LEAST ONE OPEN~MOV-516 for PCV-430~MOV-515 for PCV-431C a.Open one block valve unless it was closed to isolate an open PORV.If block valves can NOT be opened, THEN dispatch AO to locally ensure breakers to block valves closed.b.Check IA to CNMT-AVAILABLE c.Verify at least one PRZR PORV flow path-AVAILABLE d.Go to E-3, STEAM GENERATOR TUBE RUPTURE, Step 22~MOV-515, MCC C position 6C~MOV-516, MCC D position 6C b..Refer to Attachment N2 PORVS to operate PORVs.c.Go to Step 5.
+RI<g3r~g~Np Y'>I, t I EOP: ECA-3.3 T I 1'LE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV: 11 PAGE 5 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: If auxiliary spray is the only means of RCS pressure control, THEN the 320'F hT limit between the spray line and PRZR does not apply.5 Try To Establish Auxiliary Spray: a.Charging pumps-AT LEAST ONE RUNNING b.Establish auxiliary spray flow: 1)Open auxiliary spray valve (AOV-296)a.Perform the following:
1)IF CCW flow is lost to any RCP thermal barrier OR any RCP&#xb9;1 seal outlet temperature offscale high, THEN locally isolate seal injection to affected RCP.~RCP A, V-300A~RCP B, V-300B 2)Ensure HCV-142 demand at 0%.3)Start charging pumps as necessary.
IF charging not available, THEN go to Step 6.b.IF auxiliary spray can NOT be established, THEN go to Step 6.2)Close charging valve to loop B cold leg (AOV-294)c.Go to E-3, STEAM GENERATOR TUBE RUPTURE, Step 21b TY" V'I f Jk f4 EOP: ECA-3.3 TITLE: 'SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV 11 PAGE 6 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED*xx**x*x*xxx***%>xxxxxxxxx%x*xxx*********
CAUTION IF CST LEVEL DECREASES TO LESS THAN 5 FEET, THEN ALTERNATE WATER SOURCES FOR AFW PUMPS WILL BE NECESSARY (REFER TO ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS).*************
x**x*************
x**********
NOTE: TDAFW pump flow control valves fail open on loss of IA.*6 Monitor Intact S/G Level: a.Narrow range level-GREATER THAN 5%[25%adverse CNMT]b.Control feed flow to maintain narrow range level between 17%[25%adverse CNMT]and 50%a.Maintain total feed flow greater than 200 gpm until narrow range level greater than 5%[25%adverse CNMT]in at least one S/G.b.IF narrow range level in intact S/G continues to increase in an uncontrolled manner, THEN go to ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT-SUBCOOLED RECOVERY DESIRED, Step 1.7 Check PRZR Level-GREATER THAN 5%(30<adverse CNMT]Return to Step 1.
tw'P EOP: ECA-3.3 TITLE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV: 11 PAGE 7 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 8 Check If SI Can Be Terminated:
a.RCS subcooling based on core exit T/Cs-GREATER THAN O'USING FIGURE MIN SUBCOOLING a.Do NOT stop SI pumps.Go to ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT-SUBCOOLED RECOVERY DESIRED, Step 1.b.Secondary heat sink: o Total feed flow to S/Gs GREATER THAN 200 GPM AVAILABLE-OR-b.IF neither condition satisfied, THEN do NOT stop SI pumps.Go to ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT-SUBCOOLED RECOVERY DESIRED, Step l.o Narrow range level in intact S/G-GREATER THAN 5%(25%adverse'NMTj c.RVLIS indication o Level (no RCPs)-GREATER THAN 68%[73%adverse CNMT]-OR-c.Do NOT stop SI pumps.Go to ECA-3', SGTR WITH LOSS OF REACTOR COOLANT-SUBCOOLED RECOVERY DESIRED, Step 1.o Fluid fraction (any RCP running)-GREATER THAN 80%d.Any ruptured S/G narrow range level-INCREASING IN AN UNCONTROLLED MANNER OR OFFSCALE HIGH d.Do NOT stop SI pumps.Return to Step 2.
f If%, fl 4t j,t EOP: ECA-3.3 TITLE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV: 11 PAGE 8 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 9 Stop SI Pumps and Place In AUTO r 1g't t%I"~ew/a f R I EOP: ECA-3.3 TITLE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV 11 PAGE 9 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 10 Check If Charging Flow Has Been Established:
a.Charging pumps-ANY RUNNING a.Perform the following:
1)IF CCW flow is lost to any RCP thermal barrier OR any RCP&#xb9;1 seal outlet temperature offscale high, THEN dispatch AO with key to RWST gate to close seal injection needle valve(s)to affected RCP:~RCP A, V-300A~RCP B, V-300B 2)Ensure HCV-142 open, demand at OS.b.Charging pump suction aligned to RWST: o LCV-112B-OPEN o LCV-112C-CLOSED b.Manually align valves as necessary.
IF LCV-112B can NOT be opened, THEN perform the following.')
Verify charging pump A NOT running and place in PULL STOP.2)Dispatch AO to locally open manual charging pump suction from RWST (V-358 located in charging pump room).c.Start charging pumps as necessary and adjust charging flow to restore PRZR level 3)WHEN V-358 open, THEN direct AO to close V-268 to isolate charging pumps B and C from VCT (V-268 located in charging pump room).
'~'~4 EOP: ECA-3.3 TITLE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV'1 PAGE 10 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED*11 Monitor RCS Inventory:
o RCS subcooling based on core exit T/Cs-GREATER THAN O'USING FIGURE MIN SUBCOOLING o RVLIS indication o Level (no RCPs)-GREATER THAN 68%f73%adverse CNMT]-OR-Perform the following:
a.Manually operate SI pumps as necessary.
b.Go to ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT-SUBCOOLED RECOVERY DESIRED, Step l.o Fluid fraction (any RCP rLInning)-GREATER THAN 80%12 Verify Adequate SW Flow To CCW Hx: a.Verify at least two SW pumps RUNNING b.Verify AUX BLDG SW isolation valves-OPEN~MOV-4615 and MOV-4734~MOV-4616 and MOV-"4735 a.Manually start pumps as power supply permits (258 kw per pump).IF less than two SW pumps can be operated, THEN go to Step 20.b.Establish SW to AUX BLDG (Refer to Attachment AUX BLDG SW).c.Verify CNMT RECIRC fan annunciator C-2, HIGH TEMPERATURE ALARM-EXTINGUISHED c.Dispatch AO to locally throttle flow to CCW Hx to between 5000 gpm and 6000 gpm total flow.
4*J t EOP: ECA-3.3 TITLE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV: 11.PAGE 11 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 13 Check I f Normal CVCS Operation Can Be Established a.Verify IA restored: o IA to CNMT (AOV-5392)
-OPEN o IA pressure-GREATER THAN 60 PSIG'.Continue with Step 17.WHEN IA restored, THEN do Steps 13 through 16.b.Verify instrument bus D ENERGIZED c.CCW pumps-ANY RUNNING b.Energize MCC B.IF MCC B NOT available, THEN perform the following:
1)Verify MCC A energized.
2)Place instrument bus D on maintenance supply.c.Perform the following:
1)IF any RCP&#xb9;1 seal outlet temperature offscale high, THEN isolate CCW to thermal barrier of affected RCP(s).~RCP A, MOV-749A and MOV-759A~RCP B, MOV-749B and MOV-759B d.Charging pump-ANY RUNNING 2)Manually start one CCW pumps d.Continue with Step 20.WHEN any charging pump running, THEN do Steps 14 through 17.
f*'P EOP: ECA-3.3 TlTLE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV ll PAGE 12 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: If PRZR level is less than 13%, letdown may be established by placing AOV-427 to OPEN.14 Establish Normal Letdown: a.Establish charging line flow to REGEN Hx-GREATER THAN 20 GPM b.Place the following switches to CLOSE:~Letdown orifice valves (AOV-200A, AOV-200B, and AOV-202)~AOV-371, letdown isolation valve~AOV-427, loop B cold leg to REGEN Hx c.Place letdown controllers in MANUAL at 40%open~TCV-130~PCV-135 d.Reset both trains of XY relays for AOV-371 and AOV-427 e.Open AOV-371 and AOV-427 IF RCP seal return has been established, THEN establish excess letdown as follows: o Place excess letdown divert valve, AOV-312, to NORMAL.o Ensure CCW from excess letdown open, (AOV-745).
o Open excess letdown isolation valve AOV-310.o Slowly open HCV-123 to maintain excess letdown temperature less than 195'F and pressure less than 100 psig.o Adjust charging pump speed as necessary.
IF RCP seal return NOT established, THEN consult TSC to determine if excess letdown should be placed in service.f.Open letdown orifice valves as necessary g.Place TCV-130 in AUTO at 105'F h.Place PCV-135 in AUTO at 250 psig i.Adjust charging pump speed and HCV-142 as necessary il Ij l I/g al%,"V E-" f EOP: ECA-3.3 1'TLE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV 11 PAGE 13 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 15 Check VCT Makeup System: P a.Adjust boric acid flow control valve in AUTO to 9.5 gpm b.Verify the following:
1)RMW mode selector switch in AUTO b.Adjust controls as necessary.
2)RMW control armed-RED LIGHT LIT c.Check VCT level: o Level-GREATER THAN 20%-OR-o Level-STABLE OR INCREASING c.Manually increase VCT makeup flow as follows: 1)Ensure BA transfer pumps and RMW pumps running.IF NOT, THEN reset MCC C and MCC D UV lockouts as necessary.
2)Place RMW flow control valve HCV-ill in MANUAL.3)Increase RMW flow.
'$'t tg EOP: ECA-3.3 TITLE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV: 11 PAGE 14'f 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 16 Check Charging Pump Suction Aligned To VCT: a.VCT level-GREATER THAN 20%a.IF VCT level can NOT be maintained greater than 5%, THEN perform the following:
1)Ensure charging pump suction aligned to RWST o LCV-112B open o LCV-112C closed 2)Continue with Step 17.WHEN VCT level greater than 40%, THEN do Step 16b.b.Verify charging pumps aligned to VCT o LCV-112C-OPEN o LCV-112B-CLOSED b.Manually align valves as necessary.
v 4 EOP: ECA-3.3 1'Z LE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV: 11 PAGE 15 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 17 Check RCP Cooling: a.Check CCW to RCPs: Establish normal cooling to RCPs (Refer to Attachment SEAL COOLING).o Annunciator A-7, RCP 1A CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED o Annunciator A-15, RCP 1B CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED b.Check RCP seal injection:
o Labyrinth seal D/Ps-GREATER THAN 15 INCHES OF WATER-OR-o RCP seal injection flow to each RCP-GREATER THAN 6 GPM Xii+4 V 1Z EOP: ECA-3.3 TlTLE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV: 11 PAGE 16 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 18 Check If Seal Return Flow Should Be Established:
a.Verify RCP&#xb9;1 seal outlet temperature
-LESS THAN 235'F b." Verify RCP seal outlet valves OPEN~AOV-270A~AOV-270B a.Go to Step 19.b.Manually open valves as necessary.
c.Reset both trains of XY relays for RCP seal return isolation valve MOV-313 d.Open RCP seal return isolation valve MOV-313 e.Verify RCP&#xb9;1 seal leakoff flow LESS THAN 5.5 GPM d.Perform the following:
1)Place MOV-313 switch to OPEN.2)Dispatch AO with key to RWST gate to locally open MOV-313.e.IF any RCP seal leakoff flow greater than 5.5 gpm THEN: o Close the affected RCP seal discharge valve~RCP A, AOV-270A~RCP B, AOV-270B f.Verify RCP&#xb9;1 seal leakoff flow GREATER THAN 0.25 GPM o Trip the affected RCP IF both RCP seal discharge valves are shut, THEN go to Step 19.f.Refer to AP-RCP.1, RCP SEAL MALFUNCTION
.
~W 44 r.r K EOP: ECA-3.3 TITLE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV: 11 PAGE 17 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 19 Equalize Charging And Letdown Flows: a.Verify charging pump controllers in manual b.Control charging and seal injection flows to equal letdown and seal leakoff flows 20 Check If Emergency D/Gs Should Be Stopped: a.Verify AC emergency busses energized by offsite power: o Emergency D/G output breakers OPEN a.Try to restore offsite power (Refer to ER-ELEC.1, RESTORATION OF OFFSITE POWER).o AC emergency bus voltage GREATER THAN 420 VOLTS o AC emergency bus normal feed breakers-CLOSED b.Stop any unloaded emergency D/G and place in standby (Refer to Attachment D/G STOP)21 Minimize Secondary System Contamination:
a.Isolate reject from hotwell to CST: o Place hotwell level controller (HC-107)in MANUAL at 50%a.IF hotwell level increasing, THEN direct RP to sample hotwells for activity.o Verify hotwell level-STABLE b.Verify local actions to complete isolation of ruptured S/G (Refer to Attachment RUPTURED S/G) i4 tile t~f,,'g: i,f~II~w t l J EOP: TITLE: REV 11 ECA-3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 18 of 27-STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Adverse,CNMT conditions or loss of forced air cooling may result in failure of NIS detectors.
22 Check If Source Range Detectors Should Be Energized:
a.Source range channels DEENERGIZED a.Go to Step 22e.b.Check intermediate range flux-EITHER CHANNEL LESS THAN 10 10 AMPS b.Perform the following:
1)IF neither intermediate range channel is decreasing, THEN initiate boration.2)Continue with Step 23.WHEN flux is LESS THAN 10 amps on any operable channel, THEN do Steps 22c through e.c.Check the following:
o Both intermediate range channels-LESS THAN 10 10 AMPS c.Continue with Step 23.WHEN either condition met, THEN do Steps 22d and e.-OR-o Greater than 20 minutes since reactor trip d.Verify source range detectors ENERGIZED d.Manually energize source range detectors by depressing P-6 permissive defeat pushbuttons (2 of 2).IF source ranges can NOT be restored, THEN refer to ER-NIS.1, SR MALFUNCTION and go to Step 22.e.Transfer Rk-45 recorder to one source range and one intermediate range channel
~1/c~I Lg EOP: ECA-3.3 TITLE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV: 11 PAGE 19 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 23 Establish Normal Shutdown Alignment:
a.Check condenser-AVAILABLE a.Dispatch AO to perform Attachment SD-2.b.Perform the following:
o Open generator disconnects
~1G13A71~9X13A73 o Place voltage regulator to OFF o Open turbine drain valves o Rotate reheater steam supply controller cam to close valves o Place reheater dump valve switches to HAND o Stop all but one condensate pump c.Verify adequate Rx head cooling: 1)Check IA to CNMT-AVAILABLE 1)Go to Step 24.2)Verify at least one control rod shroud fan-RUNNING 2)Manually start one fan as power supply permits (45 kw)3)Verify one Rx compartment cooling fan-RUNNING 3)Perform the following:
o Dispatch AO to reset UV relays at MCC C and MCC D.o Manually start one fan as'power supply permits (23 kw)d.Verify Attachment SD-1-COMPLETE I~,E>a~~C'1 EOP: ECA-3.3 TLTLF.: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV: 11 PAGE 20 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Plant staff should decide whether to repair PRZR pressure control systems or continue with this procedure.
If PRZR pressure control is established, PRZR level should be restored to greater than 5%[30%adverse CNMTj and then further recovery should continue with E-3, STEAM GENERATOR TUBE RUPTURE, Step 37.24 Check If SI ACCUMs Should Be Isolated: a.Check the following:
o RCS subcooling based on core exit T/Cs-GREATER THAN O'USING FIGURE MIN SUBCOOLING a.Return to Step 11.o RVLIS indication
-GREATER THAN 68%[73%adverse CNMT]b.Dispatch AO with locked valve key to locally close breakers for SI ACCUM discharge valves~MOV-841, MCC C position 12F~MOV-865, MCC D position 12C c.Close SI ACCUM discharge valves+MOV-841~MOV-865 c.Vent any unisolated ACCUMs: 1)Open vent valves for unisolated SI ACCUMs.~ACCUM A, AOV-834A~ACCUM B, AOV-834B d.Locally reopen breakers for MOV-841 and MOV-865 2)Open HCV-945.
sCk 4 (f, A~a 1 EOP: ECA-3.3 TITLE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV: 11 PAGE 21 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Leakage from ruptured S/G into RCS will dilute RCS boron concentration.
25 Verify Adequate Shutdown Margin a.Direct HP to sample RCS and ruptured S/G for boron concentration b.Verify boron concentration GREATER THAN REQUIREMENTS OF FIGURE SDM b.Borate as necessary.
26 Maintain Required RCP Seal Injection Flow And Labyrinth Seal D/P: o Labyrinth seal D/P to each RCP GREATER THAN 15 INCHES OF WATER Perform the following:
o Adjust charging flow to REGEN Hx, HCV-142 as necessary.-OR-o RCP seal injection flow GREATER THAN 6 GPM o Dispatch AO to adjust seal injection needle valves V-300A and V-300B if necessary.
27 Initiate RCS Cooldown to 350'F In RCS Cold Legs: a.Establish and maintain cooldown rate in RCS cold legs-LESS THAN 100'F/HR b.Dump steam to condenser from intact S/G b.Manually or locally dump steam using intact S/G ARV.IF no intact S/G available, THEN use faulted S/G.
4 J 4h(Xt n's EOP: ECA-3.3 j11'LE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV: 11 PAGE 22 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED*******x*x x x x x x x x x%x x%x x*x x**********x***
CAUTION RCS AND RUPTURED S/G PRESSURES MUST BE MAINTAINED LESS THAN THE RUPTURED S/G ARV SETPOINT.**x************
x x x x**************
x*******28 Control Charging Flow To Maintain RCS Subcooling:
a.RCS subcooling based on core exit T/Cs-GREATER THAN 20'F USING FIGURE MIN SUBCOOLING b.Ruptured S/G narrow range level LESS THAN 90%[85%adverse CNMT)c.Ruptured S/G narrow range level STABLE OR DECREASING a.Increase charging flow to maintain subcooling greater than 20'F using Figure MIN SUBCOOLING and go to Step 29.b.Control charging flow to maintain RCS pressure at ruptured S/G pressure and go to Step 29.c.IF ruptured S/G level increasing, THEN decrease charging flow to stabilize level.Maintain RCS subcooling greater than'20'F using Figure MIN SUBCOOLING.
29 Check If RCS Cooldown Should Be Stopped: a.RCS cold leg temperatures
-LESS THAN 350'F a.Return to Step 25.b.Stop RCS cooldown Ql7.rf~" Vf'P l p/I s EOP: ECA-3.3 TITLE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV: 11 PAGE 23 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 30 Check RCS Pressure-GREATER THAN 400 PSIG[300 PSIG adverse CNMT]Go to Step 33.*31 Monitor Ruptured S/G Narrow Range Level-GREATER THAN 174 (25'dverse CNMT)Refill ruptured S/G to 67%[55%adverse CNMT)using feed flow.IF either of the following conditions occurs, THEN stop feed flow to ruptured S/G: o Ruptured S/G pressure decreases in an uncontrolled manner.-OR-o Ruptured S/G pressure increases to 1020 psig.


EOP: ECA-3.3 titLE: SGTR WITHOUT-PRESSURIZER PRESSURE CONTROL REV: 11 PAGE 24 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED********0'x x%x x x x@**0**x********x**x*****CAUTION~o STEAM SHOULD NOT BE RELEASED FROM A RUPTURED S/G IF WATER MAY EXIST IN ITS STEAMLINE.
EOP:           TITLE:
o RUPTURED S/G PRESSURE MAY DECREASE RAPIDLY WHEN STEAM IS RELEASED.********0 x*%x 0*%''x x w%x x 0**x****x********
REV  14 SGTR WITH LOSS OF REACTOR COOLANT KCA-3.2                    SATURATED RECOVERY DESIRED PAGE 1  of 1 FIGURE MIN SUBCOOLING NOTE:   Subcool'ing Margin = Saturation Temperature From Figure Belov [-] Core Exit T/C Indication RC S PRESSURE   (PSIG) 2500 2400 RCS PRESSURE 2300 INCREMENTS 20 PSIG 2200 2100 2000 1900 1800 1700 1600 1500 1400                          SUBCOOLED 1300                            REGION 1200 1100 1000 900 800 INADEQUATE 700 SUBCOOL ING 600      ADVERSE  C NMT REGION 500 400 300 200                                        NORMAL CNMT                  TEMPERATURE INCREMENTS 10'F 100 0
NOTE: The upper head region may void during RCS depressurization if RCPs are not running.This may result in a rapidly increasing PRZR level.32 Depressurize RCS And Ruptured S/G To 400 PSIG[300 PSIG adverse CNMT]a.Perform the following:
200      250      300      350    400    450    500    550      600      650    700 CORE EXIT SATURATION TEMPERATURE ( F)
o Decrease charging and increase letdown to initiate backfill-OR-o Initiate blowdown from ruptured S/G-OR-o Dump steam from ruptured S/G b.Check RCS pressure-LESS THAN 400 psig[300 psig adverse CNMTI b.Return to Step 31.c.Stop RCS depressurization 1 J'~y't~v LC+'1~if EOP: ECA-3.3 TITLE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV: 11 PAGE 25 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 33 Check If RHR Normal Cooling Can Be Established:
 
a.RCS cold leg temperature
I
-LESS THAN 350'F a.Return to Step 27.b.RCS pressure-LESS THAN 400 psig (300 psig adverse CNMTj b.Return to Step 31.c.Place RCS overpressure protection system in service (Refer to 0-7, ALIGNMENT AND OPERATION OF THE REACTOR VESSEL OVERPRESSURE PROTECTION SYSTEM)d.Establish RHR normal cooling (Refer to Attachment RHR COOL)c.IF RCS overpressure protection system can NOT be placed in service, THEN notify TSC of potential Tech Spec violation if RHR system is placed in service.NOTE: Leakage from ruptured S/G into RCS will dilute RCS boron concentration.
  ~ i  <
34 Verify Adequate Shutdown Margin a.Direct HP to sample RCS and ruptured S/G for boron concentration b.Verify boron concentration-GREATER THAN REQUIREMENTS OF FIGURE SDM b.Borate as necessary.
                  , Sw I
I Qt EOP: ECA-3.3 TITLE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV: 11 PAGE 26 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 35 Initiate RCS Cooldown To Cold Shutdown: a.Establish and maintain cooldown rate in RCS cold legs-LESS THAN 100'F/HR b.Use RHR system if in service c.Dump steam to condenser from intact S/G c.Manually or locally dump steam from intact S/G using ARVs.IF no intact S/G available and RHR system NOT in service, THEN use faulted S/G.36 Control Charging Flow To Maintain RCS Subcooling:
J S
a.RCS subcooling based on core exit T/Cs-GREATER THAN 20'F USING FIGURE MIN SUBCOOLING b.Ruptured S/G narrow range level LESS THAN 90%f85%adverse CNMTJ c.Ruptured S/G narrow range level STABLE OR DECREASING a.Increase charging flow to maintain subcooling greater than 20'F using Figure MIN SUBCOOLING and go to Step 37.b.Control charging flow to maintain RCS pressure at ruptured S/G pressure and go to Step 37.c.IF ruptured S/G level increasing, THEN decrease charging flow to stabilize level.Maintain RCS subcooling greater than 20'F using Figure MIN SUBCOOLING.
E
4 C E (J-)P t EOP: ECA-3.3 TITLE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV 11 PAGE 27 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED*37 Monitor RCP Operation:
+IS S
a.RCPs-ANY RUNNING b.Check the following:
lp g ,'ii
o RCP 41 seal D/P-LESS THAN 220 PSID a.Go.to Step 39.b.Go to Step 39.-OR-o Check RCP seal leakage-LESS THAN 0.25 GPM c.Stop affected RCP(s)38 Check Core Exit T/Cs-LESS THAN 200'F Return to Step 34.39 Evaluate Long Term Plant Status: a.Maintain cold shutdown conditions b.Consult TSC-END-I(C t tg ht ls 5<Jl 0 EOP: ECA-3.3 TITLE SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV: 11 PAGE 1 of 1 ECA-3.3 APPENDIX LIST TITLE PAGES 1)RED PATH  
 
EOP:            TITLE:
REV    14 SGTR WITH LOSS OF REACTOR COOLANT SCA-3.2                    SATURATED RECOVERY DESIRED PAGE 1  of 1 FIGURE SDM NOTE:    o Curve includes allowance for one stuck rod. Add 100 ppm for each additional stuck rod.
o To obtain core burnup, use PPCS point ID BURNUP.
BORON CONCENTRATION    (PPH) 1800 BORON INCREMENTS 20 PPM 1600 1400 ADEQUATE SDH 1200                                                        100 PPH CONSERVATISM INCLUDED 1000 800 600 400 200                                                                        BURNUP INCREMENTS 100 HWD/HTU 0   1000    2000  3000    4000  5000  6000  7000    8000  9000 10000  11000  12000 CYCLE 25 BURNUP (MWD/HTU)
 
                ~ 1 p
:4i
        '~ ~
I
''4 '1 tpq sr~'
 
EOP:            TITLE:
REV: 14
      'ECA-3.2            SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED                PAGE 1  of  1 FIGURE TSAT SAT URATION PRESSURE    (PSIG) 2500 2400        PRESSURE 2300        INCREMENTS 20 PSIG 2200 2100 2000 1900 1800 1700 1600 1500 1400 1300 1200 1100 1000 900 800 700 600 500 400 300 TEMPERATURE 200 INCREMENTS 10'F 100 0
20 0    250      300      350      400    450    500    550  600    650    700 CORE  EXIT SATURATION TEMPERATURE  (')
 
k
            '4 1 ~
4 ~
    ~
      ~
4 AQ f
 
EOP:            T!TLE REV: 14 SGTR WITH LOSS OF REACTOR COOLANT
  +CA-3. 2                      SATURATED RECOVERY DESIRED                    PAGE 1    of  1 FIGURE RCP SEAL LEAKOFF
&#xb9;1  SEAL LEAK RATE (GPM) 6 LEAK RATE INCREMENTS 0.2  GPM NORMAL OPERATING RANGE DP  INCREMENTS 50 PSI 250      500      750    1000    1250    1500    1750      2000  2250    2500
                            &#xb9;I  SEAL DP (RCS PRESS - VCT PRESS)  PSI
 
A>>
4
~"
 
EOP:         TITLE:
SGTR WITH LOSS OF REACTOR COOLANT              REV   14
~ECA-3.2                  SATURATED RECOVERY DESIRED PAGE of 1 FOLDOUT PAGE 1 ~  SI REINITIATION CRITERIA IF  EITHER    condition listed below occurs,      THEN manually operate SI pumps as necessary:
o  Core    exit T/Cs    INCREASING
                        -OR-o  Check RVLIS    indication:
Level (no  RCPs)  LESS THAN 684  [734 adverse  CNMT]
Fluid fraction (any    RCP running)    LESS THAN 80%
2 ~  SECONDARY INTEGRITY      CRITERIA IF any S/G pressure is decreasing in an uncontrolled manner or is completely depressurized, and has not been isolated, THEN go to E-2, FAULTED S/G ISOLATION, Step 1, unless faulted S/G needed    for  RCS  cooldown.
: 3. COLD LEG RECIRCULATION SWITCHOVER CRITERION IF RWST    level decreases to less than    28%, THEN go  to ES-1.3, TRANSFER TO COLD LEG RECIRCULATION,        Step 1.
: 4. LOSS OF EMERGENCY COOLANT RECIRCULATION CRITERION IF emergency coolant recirculation is established and subsequently    lost,  THEN go  to ECA-1.1, JOSS OF EMERGENCY COOLANT RECIRCULATION, 'Step 1.
: 5. AFW SUPPLY SWITCHOVER CRITERION IF  CST  level decreases to less than 5 feet, THEN switch to alternate AFW water supply (Refer to ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS).
 
I n
C
 
EOP:        TITLE:
REV  11 ECA-3.3    SGTR WITHOUT PRESSURIZER  PRESSURE CONTROL PAGE 1  of 27 RO  ESTER GAS AND ELECTRIC CORPORATION GINNA STATION CON  OLLED COPY NUMBER TEC  ICAL REVIEW PORC REVIEW DATE PLANT  UPERINTE  ENT cg  cg EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:
 
~i EOP:
REV: 11 ECA-3.3     SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE of 27 A. PURPOSE  This procedure provides actions for a SGTR with coincident loss of normal  and auxiliary PRZR sprays and PORVs.
B. ENTRY CONDITIONS/SYMPTOMS
: 1. ENTRY CONDITIONS    This procedure is entered from:
: a. E-3, STEAM GENERATOR TUBE RUPTURE, when  PRZR pressure control is not available.
 
~p lp eI lg Ot k
P j
b~
 
EOP:            TITLE:
REV: 11 ECA-3.3        SGTR WITHOUT PRESSURIZER        PRESSURE    CONTROL PAGE 3  of 27 STEP      ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED NOTE:  o  Foldout page should be open    AND monitored periodically.
o  Adverse    CNMT values should be used whenever CNMT pressure is greater than    4 psig or CNMT radiation is greater than 10+        R/hr.
1 Check Ruptured S/G Narrow                    Go  to Step 8.
Range Level  LESS THAN 67:
[55% adverse     CNMT]
2 Check  RCP  Status    AT LEAST          Try to  start  one RCP:
ONE RUNNING
: a. Establish conditions for starting  RCP.
o  Bus 11A and Bus 11B    energized o  Refer to Attachment    RCP START
: b. Start one    RCP. IF no RCP can be started,  THEN go to Step 4.
3 Check IF Normal PRZR Spray Available:
: a. Verify IA to   CNMT - AVAILABLE        a. Perform the    following:
: 1) Place  PRZR  heater control group to PULL STOP.
: 2) Place PRZR heater backup group to OFF.
: 3) Place normal spray valve controllers to  MANUAL at 0%.
: 4) Go  to Step 4.
: b. Go to E-3,  STEAM GENERATOR TUBE RUPTURE,  Step 21
 
'be( m i.
          'J l~
4
 
EOP:            TITLE REV: 11 ECA-3.3        SGTR WITHOUT PRESSURIZER     PRESSURE     CONTROL PAGE 4    of 27 STEP       ACTION/EXPECTED RESPONSE           RESPONSE NOT OBTAINED 4 Try To Restore        PRZR PORV:
: a. Block valves - AT LEAST    ONE OPEN  a. Open one block valve unless      it was closed to isolate an open
          ~  MOV-516  for  PCV-430                PORV.
          ~  MOV-515  for  PCV-431C If block valves  can  NOT be opened,  THEN  dispatch AO to locally ensure breakers to block valves closed.
                                                    ~  MOV-515, MCC C  position  6C
                                                    ~  MOV-516, MCC D  position  6C
: b. Check IA to    CNMT - AVAILABLE      b.. Refer to Attachment    N2 PORVS  to operate  PORVs.
: c. Verify at least one PRZR    PORV    c. Go  to Step 5.
flow path - AVAILABLE
: d. Go  to E-3,  STEAM GENERATOR TUBE RUPTURE,    Step 22
 
  +RI
              ~
      < g3r~g Np Y'>
I, t
I
 
EOP:              T I 1'LE:
REV: 11 ECA-3.3            SGTR WITHOUT PRESSURIZER          PRESSURE    CONTROL PAGE 5    of 27 STEP      ACTION/EXPECTED RESPONSE                    RESPONSE  NOT OBTAINED NOTE:  If auxiliary        spray is the only means of RCS pressure control, THEN the  320'F      hT  limit between the spray line and PRZR does not apply.
5 Try To Establish Auxiliary Spray:
: a. Charging pumps - AT LEAST          ONE        a. Perform the    following:
RUNNING
: 1)  IF CCW  flow is lost to any RCP  thermal barrier OR any RCP  &#xb9;1 seal outlet temperature offscale high, THEN locally isolate seal injection to affected RCP.
                                                                ~ RCP A,  V-300A
                                                                ~ RCP B,  V-300B
: 2) Ensure HCV-142 demand    at  0%.
: 3) Start charging pumps as necessary.
IF charging not available, THEN go  to Step 6.
: b. Establish        auxiliary spray flow:      b. IF  auxiliary spray    can  NOT  be established,    THEN go to Step 6.
: 1) Open auxiliary spray valve (AOV-296)
: 2) Close charging valve to loop B cold leg (AOV-294)
: c. Go  to E-3,        STEAM GENERATOR TUBE RUPTURE,        Step 21b
 
TY" V'
I fJk f4
 
EOP:              TITLE:
REV    11 ECA-3.3        'SGTR WITHOUT PRESSURIZER PRESSURE            CONTROL PAGE 6    of 27 STEP        ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED
  *xx**x*x*xxx***%>xxxxxxxxx%x*xxx*******
CAUTION IF  CST LEVEL DECREASES TO LESS THAN 5 FEET, THEN ALTERNATE WATER SOURCES FOR AFW PUMPS  WILL BE NECESSARY (REFER TO ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS).
  *************                    x  ** *************
x                              x**********
NOTE:    TDAFW pump    flow control valves  fail open on loss    of IA.
* 6  Monitor Intact S/G Level:
: a. Narrow range    level  - GREATER        a. Maintain    total feed flow greater THAN 5%  [25%  adverse  CNMT]              than 200  gpm until narrow range level greater than 5% [25%
adverse CNMT] in at least one S/G.
: b. Control feed flow to maintain              b. IF narrow range level    in intact narrow range level between 17%                S/G  continues to increase in an
[25% adverse CNMT] and 50%                    uncontrolled manner, THEN go to ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT - SUBCOOLED RECOVERY DESIRED, Step 1.
7  Check PRZR Level  GREATER                    Return to Step 1.
THAN 5% (30< adverse CNMT]
 
tw '
P
 
EOP:              TITLE:
REV: 11 ECA-3.3          SGTR WITHOUT PRESSURIZER  PRESSURE      CONTROL PAGE 7    of 27 STEP      ACTION/EXPECTED RESPONSE          RESPONSE  NOT OBTAINED 8 Check    If SI    Can Be  Terminated:
: a. RCS  subcooling based on core      a. Do NOT  stop SI pumps. Go to exit  T/Cs -  GREATER THAN O'          ECA-3.1,  SGTR WITH LOSS OF USING FIGURE MIN SUBCOOLING              REACTOR COOLANT - SUBCOOLED RECOVERY DESIRED, Step 1.
: b. Secondary heat sink:                b. IF neither condition satisfied, THEN do NOT stop SI pumps. Go o  Total feed flow to    S/Gs          to ECA-3.1, SGTR WITH LOSS OF GREATER THAN 200 GPM AVAILABLE      REACTOR COOLANT - SUBCOOLED RECOVERY DESIRED, Step  l.
                        -OR-o  Narrow range  level in intact S/G - GREATER THAN    5%  (25%
adverse'NMTj
: c. RVLIS indication                    c.                SI pumps. Go to o  Level (no  RCPs) - GREATER Do NOT ECA-3 ',stop SGTR WITH LOSS OF REACTOR COOLANT - SUBCOOLED THAN 68%  [73% adverse CNMT]        RECOVERY DESIRED, Step 1.
                        -OR-o  Fluid fraction (any    RCP running)  - GREATER THAN 80%
: d. Any ruptured S/G narrow range      d. Do NOT  stop SI pumps. Return to level - INCREASING IN AN                Step 2.
UNCONTROLLED MANNER OR OFFSCALE HIGH
 
f If%, fl 4t j,t
 
EOP:          TITLE:
REV: 11 ECA-3.3      SGTR WITHOUT PRESSURIZER PRESSURE  CONTROL PAGE 8  of 27 STEP    ACTION/EXPECTED RESPONSE      RESPONSE NOT OBTAINED 9  Stop SI Pumps and Place In AUTO
 
r 1g
't t %
I"
~ ew
  /a f
R I
 
EOP:            TITLE:
REV    11 ECA-3.3        SGTR WITHOUT PRESSURIZER  PRESSURE              CONTROL PAGE 9    of 27 STEP      ACTION/EXPECTED RESPONSE          RESPONSE            NOT OBTAINED 10 Check Been If Charging Established:
Flow Has
: a. Charging pumps  - ANY RUNNING      a. Perform the              following:
: 1)          IF  CCW  flow is lost to any RCP  thermal barrier OR any RCP  &#xb9;1 seal outlet temperature offscale high, THEN  dispatch AO with key to RWST  gate to close seal injection needle valve(s) to affected  RCP:
                                                              ~  RCP A,  V-300A
                                                              ~  RCP B,  V-300B
: 2) Ensure HCV-142 open, demand at  OS.
: b. Charging  pump suction aligned to b. Manually align valves as RWST:                                  necessary.              IF LCV-112B can  NOT be opened, THEN perform the o  LCV-112B  - OPEN following.')
o  LCV-112C - CLOSED                                Verify charging    pump A NOT running and place in    PULL STOP.
: 2) Dispatch AO to locally open manual charging pump suction from RWST (V-358 located in charging  pump  room).
: 3)          WHEN  V-358 open,  THEN  direct AO  to close V-268 to isolate charging pumps B and C from VCT (V-268 located in charging pump room).
: c. Start charging pumps as necessary and adjust charging flow to restore  PRZR  level
 
    ~ '
  ~
4
 
TITLE:
EOP:
REV'1 ECA-3.3        SGTR WITHOUT PRESSURIZER PRESSURE    CONTROL PAGE 10  of 27 STEP      ACTION/EXPECTED RESPONSE        RESPONSE  NOT OBTAINED
*11  Monitor      RCS  Inventory:          Perform the following:
o  RCS  subcooling based on core    a. Manually operate SI pumps as exit  T/Cs -  GREATER THAN O'        necessary.
USING FIGURE MIN SUBCOOLING
: b. Go to ECA-3.1, SGTR WITH LOSS OF o  RVLIS    indication                    REACTOR COOLANT - SUBCOOLED RECOVERY DESIRED, Step    l.
o  Level (no    RCPs) - GREATER THAN 68% f73% adverse CNMT]
                        -OR-o  Fluid fraction (any    RCP rLInning)  - GREATER THAN 80%
12  Verify Adequate        SW  Flow To CCW  Hx:
: a. Verify at least    two  SW pumps  a. Manually    start pumps as power RUNNING                                supply permits (258 kw per pump). IF less than two SW pumps can be operated, THEN    go to Step 20.
: b. Verify AUX    BLDG SW  isolation  b. Establish SW to AUX BLDG (Refer valves    - OPEN                      to Attachment AUX BLDG SW).
          ~ MOV-4615 and MOV-4734
          ~ MOV-4616 and MOV-"4735
: c. Verify    CNMT RECIRC  fan        c. Dispatch AO to locally throttle annunciator C-2,    HIGH              flow to CCW Hx to between TEMPERATURE ALARM - EXTINGUISHED      5000 gpm and 6000 gpm    total flow.
 
4
*J t
 
EOP:            TITLE:
REV: 11 ECA-3.3        SGTR WITHOUT PRESSURIZER    PRESSURE    CONTROL PAGE 11    of 27 STEP      ACTION/EXPECTED RESPONSE            RESPONSE  NOT OBTAINED 13  Check  If Normal      CVCS Operation      Can Be    Established
: a. Verify IA restored:                      Continue with Step 17.        WHEN  IA restored, THEN do Steps        13 o  IA to  CNMT (AOV-5392) -  OPEN      through 16.
o  IA pressure    - GREATER THAN 60 PSIG
: b. Verify instrument    bus D          b. Energize    MCC  B. IF MCC B NOT ENERGIZED                                available,  THEN  perform the following:
: 1)  Verify MCC  A  energized.
: 2) Place instrument bus        D  on maintenance    supply.
: c. CCW  pumps  - ANY RUNNING          c. Perform the following:
: 1) IF any  RCP &#xb9;1 seal outlet temperature offscale high, THEN isolate CCW to thermal barrier of affected        RCP(s).
                                                      ~ RCP A, MOV-749A      and MOV-759A
                                                      ~ RCP B, MOV-749B      and MOV-759B
: 2) Manually    start  one    CCW  pumps
: d. Charging pump    - ANY RUNNING      d. Continue with Step 20.          WHEN  any charging  pump  running,    THEN do Steps 14  through 17.
 
f*
'P
 
EOP:
ECA-3.3 TlTLE:
SGTR WITHOUT PRESSURIZER            PRESSURE    CONTROL REV    ll PAGE 12    of 27 STEP      ACTION/EXPECTED RESPONSE                    RESPONSE  NOT OBTAINED NOTE:    If PRZR  level is less than      13%,  letdown  may be  established by placing AOV-427 to OPEN.
14  Establish Normal Letdown:                          IF RCP seal return has been established, THEN establish excess
: a. Establish charging      line flow to          letdown as follows:
REGEN Hx - GREATER THAN 20 GPM o  Place excess letdown    divert
: b. Place the following switches to                    valve, AOV-312, to    NORMAL.
CLOSE:
o  Ensure CCW from excess    letdown
          ~ Letdown    orifice valves                      open, (AOV-745).
(AOV-200A, AOV-200B, and AOV-202)                                    o  Open excess  letdown  isolation
          ~ AOV-371, letdown isolation                      valve AOV-310.
valve
          ~ AOV-427, loop    B cold leg to            o    Slowly open HCV-123 to maintain REGEN Hx                                        excess  letdown temperature less than 195'F and pressure less
: c. Place letdown controllers in                        than 100 psig.
MANUAL at 40% open o    Adjust charging    pump speed  as
          ~  TCV-130                                        necessary.
          ~ PCV-135 IF RCP seal return NOT established,
: d. Reset both for trains of AOV-371 and AOV-427 XY  relays        THEN consult TSC to determine excess  letdown should be placed in if service.
: e. Open AOV-371 and AOV-427
: f. Open  letdown    orifice valves    as necessary
: g. Place TCV-130      in  AUTO  at 105'F
: h. Place PCV-135      in  AUTO  at  250  psig
: i. Adjust charging    pump speed    and HCV-142 as necessary
 
il Ij l I/g al "V
E-"
f
 
1' TLE:
EOP:
REV    11 ECA-3.3          SGTR WITHOUT PRESSURIZER      PRESSURE    CONTROL PAGE 13    of 27 STEP      ACTION/EXPECTED RESPONSE              RESPONSE  NOT OBTAINED 15  Check VCT Makeup System:
P
: a. Adjust boric acid flow control valve in AUTO to 9.5 gpm
: b. Verify the following:                  b. Adjust controls as necessary.
: 1) RMW  mode  selector switch in AUTO
: 2) RMW  control    armed - RED LIGHT LIT
: c. Check    VCT  level:                  c. Manually increase    VCT makeup flow as  follows:
o  Level    - GREATER THAN 20%
: 1) Ensure BA  transfer  pumps and
                          -OR-                          RMW  pumps  running. IF NOT, THEN  reset MCC C and MCC D UV o  Level    - STABLE OR INCREASING          lockouts as necessary.
: 2) Place  RMW  flow control valve HCV-ill in  MANUAL.
: 3) Increase  RMW flow.
 
  $ 't tg
 
EOP:            TITLE:
REV: 11 ECA-3.3        SGTR WITHOUT PRESSURIZER  PRESSURE      CONTROL PAGE  14'f 27 STEP      ACTION/EXPECTED RESPONSE        RESPONSE  NOT OBTAINED 16  Check Charging Pump Suction Aligned    To VCT:
: a. VCT level  - GREATER THAN 20%    a. IF VCT    level  can NOT  be maintained greater than    5%, THEN perform the following:
: 1) Ensure charging pump suction aligned to  RWST o  LCV-112B open o  LCV-112C  closed
: 2) Continue    with Step 17. WHEN VCT level greater    than  40%,
THEN do Step 16b.
: b. Verify charging pumps aligned to  b. Manually align valves as VCT                                  necessary.
o  LCV-112C - OPEN o  LCV-112B - CLOSED
 
v 4
 
1' EOP:              Z LE:
REV: 11 ECA-3.3          SGTR WITHOUT PRESSURIZER    PRESSURE  CONTROL PAGE 15  of 27 STEP      ACTION/EXPECTED RESPONSE              RESPONSE NOT OBTAINED 17 Check RCP Cooling:                          Establish normal cooling to RCPs (Refer to Attachment SEAL COOLING).
: a. Check    CCW  to  RCPs:
o  Annunciator A-7,      RCP 1A CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED o  Annunciator A-15, RCP 1B CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED
: b. Check    RCP  seal injection:
o  Labyrinth seal D/Ps - GREATER THAN 15 INCHES OF WATER
                          -OR-o  RCP    seal injection flow to each    RCP  - GREATER THAN 6 GPM
 
Xii+
4 V 1Z
 
EOP:            TlTLE:
REV: 11 ECA-3.3        SGTR WITHOUT PRESSURIZER  PRESSURE      CONTROL PAGE 16    of 27 STEP      ACTION/EXPECTED RESPONSE          RESPONSE  NOT OBTAINED 18 Check Should IfBe Seal    Return Flow Established:
: a. Verify RCP &#xb9;1 seal outlet          a. Go  to Step 19.
temperature    - LESS THAN 235'F b." Verify RCP seal outlet valves      b. Manually open valves as OPEN                                    necessary.
          ~ AOV-270A
          ~ AOV-270B
: c. Reset both trains of XY relays for RCP seal return isolation valve  MOV-313
: d. Open  RCP  seal return isolation  d. Perform the    following:
valve  MOV-313
: 1) Place MOV-313 switch to OPEN.
: 2) Dispatch  AO with key to  RWST gate to  locally open MOV-313.
: e. Verify RCP &#xb9;1 seal leakoff flow    e. IF any  RCP seal leakoff flow LESS THAN    5.5  GPM                greater than 5.5 gpm THEN:
o  Close the affected  RCP seal discharge valve
                                                      ~ RCP A, AOV-270A
                                                      ~ RCP B, AOV-270B o  Trip the affected  RCP IF both RCP seal discharge valves are shut, THEN go to Step 19.
: f. Verify RCP    &#xb9;1 seal leakoff flow  f. Refer to AP-RCP.1,  RCP SEAL GREATER THAN      0.25 GPM            MALFUNCTION.
 
  ~W 44 r.r K
 
EOP:              TITLE:
REV: 11 ECA-3.3          SGTR WITHOUT PRESSURIZER      PRESSURE    CONTROL PAGE 17  of 27 STEP      ACTION/EXPECTED RESPONSE              RESPONSE  NOT OBTAINED 19  Equalize Charging And Letdown Flows:
: a. Verify charging    pump  controllers in manual
: b. Control charging and seal injection flows to equal letdown and seal    leakoff flows 20  Check Should IfBe Emergency      D/Gs Stopped:
: a. Verify AC    emergency busses          a. Try to restore  offsite  power energized by    offsite power:            (Refer to ER-ELEC.1,  RESTORATION OF OFFSITE POWER).
o  Emergency D/G output breakers OPEN o  AC emergency    bus voltage GREATER THAN    420 VOLTS o  AC  emergency bus normal feed breakers    - CLOSED
: b. Stop any unloaded emergency D/G and place in standby (Refer to Attachment D/G STOP) 21  Minimize Secondary System Contamination:
: a. Isolate reject from hotwell to        a. IF hotwell    level increasing, CST:                                      THEN  direct RP to sample hotwells for activity.
o  Place hotwell    level controller    (HC-107)  in MANUAL at  50%
o  Verify hotwell level    - STABLE
: b. Verify local actions to complete isolation of ruptured S/G (Refer to Attachment    RUPTURED  S/G)
 
i4 tile t~ f,,  'g: i,f ~ II
  ~ w    t l
J
 
EOP:            TITLE:
REV    11 ECA-3            SGTR WITHOUT PRESSURIZER      PRESSURE      CONTROL PAGE 18    of 27
  -STEP      ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED NOTE:    Adverse,CNMT conditions or loss  of forced air cooling      may  result in failure of NIS detectors.
22  Check    If Source Detectors Should Range Be Energized:
: a. Source range channels                    a. Go  to Step 22e.
DEENERGIZED
: b. Check intermediate range    flux-        b. Perform the following:
EITHER CHANNEL LESS THAN 10 10 AMPS                                  1)  IF neither intermediate range channel  is decreasing,  THEN initiate boration.
: 2) Continue  with Step 23. WHEN flux is  LESS THAN 10      amps on any operable channel,    THEN do Steps 22c through e.
: c. Check the following:                    c. Continue with Step 23.        WHEN either condition    met, THEN do o  Both intermediate range                  Steps 22d and e.
channels - LESS THAN 10 10 AMPS
                        -OR-o  Greater than  20 minutes since reactor  trip
: d. Verify source range detectors          d. Manually energize source range ENERGIZED                                    detectors by depressing P-6 permissive defeat pushbuttons      (2 of 2).
IF source ranges can NOT    be restored, THEN refer to ER-NIS.1, SR  MALFUNCTION and go to Step 22.
: e. Transfer Rk-45 recorder to one source range and one intermediate range channel
 
    ~1/ c
~I Lg
 
EOP:            TITLE:
REV: 11 ECA-3.3        SGTR WITHOUT PRESSURIZER        PRESSURE      CONTROL PAGE 19    of 27 STEP      ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED 23  Establish Normal          Shutdown Alignment:
: a. Check condenser      - AVAILABLE          a. Dispatch    AO to perform Attachment SD-2.
: b. Perform the following:
o  Open  generator disconnects
              ~ 1G13A71
              ~ 9X13A73 o  Place voltage regulator to        OFF o  Open  turbine drain valves o  Rotate reheater steam supply controller cam to close valves o  Place reheater dump valve switches to HAND o  Stop  all  but  one condensate pump
: c. Verify adequate    Rx head  cooling:
: 1) Check IA to    CNMT -  AVAILABLE        1) Go  to Step 24.
: 2) Verify at least      one  control          2) Manually start one fan as rod shroud fan      - RUNNING                power supply permits (45 kw)
: 3) Verify    one Rx compartment              3) Perform the  following:
cooling fan    - RUNNING o  Dispatch  AO to  reset  UV relays at  MCC C  and  MCC D.
o  Manually  start  one  fan as
                                                              'power supply permits (23 kw)
: d. Verify Attachment      SD-1  - COMPLETE
 
I
  ~,E>
a~
~C
'1
 
EOP:            TLTLF.:
REV: 11 ECA-3.3        SGTR WITHOUT PRESSURIZER            PRESSURE    CONTROL PAGE 20 of 27 STEP      ACTION/EXPECTED RESPONSE                    RESPONSE  NOT OBTAINED NOTE:  Plant staff should decide whether to repair          PRZR  pressure control systems or continue with this procedure.          If PRZR  pressure control is established, PRZR level should be restored to greater than 5% [30%
adverse CNMTj and then further recovery should continue with E-3, STEAM GENERATOR TUBE RUPTURE,        Step 37.
24  Check Isolated:
If SI      ACCUMs    Should  Be
: a. Check the following:                        a. Return to Step 11.
o  RCS  subcooling based on core exit  T/Cs    - GREATER THAN  O' USING FIGURE MIN SUBCOOLING o  RVLIS    indication  - GREATER THAN 68%    [73%  adverse  CNMT]
: b. Dispatch AO with locked valve key to locally close breakers for SI ACCUM discharge valves
          ~ MOV-841,      MCC C  position  12F
          ~ MOV-865,      MCC D  position  12C
: c. Close SI    ACCUM  discharge valves        c. Vent any unisolated    ACCUMs:
          + MOV-841                                        1) Open vent valves    for
          ~ MOV-865                                          unisolated SI    ACCUMs.
                                                              ~  ACCUM  A, AOV-834A
                                                              ~  ACCUM  B, AOV-834B
: 2) Open HCV-945.
: d. Locally reopen breakers        for MOV-841 and MOV-865
 
sCk 4
(f, A~
a 1
 
EOP:            TITLE:
REV: 11 ECA-3.3        SGTR WITHOUT PRESSURIZER          PRESSURE    CONTROL PAGE 21  of 27 STEP      ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED NOTE:  Leakage from ruptured S/G      into  RCS will dilute  RCS  boron concentration.
25  Verify Adequate        Shutdown Margin
: a. Direct  HP to sample RCS    and ruptured S/G for boron concentration
: b. Verify boron concentration                b. Borate as necessary.
GREATER THAN REQUIREMENTS OF FIGURE SDM 26  Maintain Required        RCP Seal            Perform the following:
Injection      Flow And Labyrinth Seal D/P:                                      o  Adjust charging flow to    REGEN Hx, HCV-142 as necessary.
o  Labyrinth seal    D/P  to each  RCP GREATER THAN 15 INCHES OF WATER                          -OR-o  RCP seal    injection flow                o  Dispatch  AO  to adjust seal GREATER THAN 6 GPM                            injection needle valves    V-300A and V-300B    if necessary.
27  Initiate    RCS  Cooldown to 350'F In    RCS  Cold Legs:
: a. Establish and maintain cooldown rate in  RCS  cold legs  - LESS THAN  100'F/HR
: b. Dump  steam to condenser    from          b. Manually or    locally  dump steam intact  S/G                                  using intact    S/G ARV.
IF  no intact  S/G available,  THEN use  faulted  S/G.
 
4 J
4h(
Xt n's
 
EOP:            j11'LE:
REV: 11 ECA-3.3          SGTR WITHOUT PRESSURIZER      PRESSURE    CONTROL PAGE 22  of 27 STEP        ACTION/EXPECTED RESPONSE              RESPONSE  NOT OBTAINED
  *******x*xx x            x x    x x x x% x x% x CAUTION x*x x**********x***
RCS AND RUPTURED S/G PRESSURES    MUST BE MAINTAINED LESS THAN THE RUPTURED S/G ARV SETPOINT.
  **x ************                  x x x x **************                  x *******
28    Control Charging Flow To Maintain RCS Subcooling:
: a. RCS  subcooling based on core            a. Increase charging flow to exit  T/Cs - GREATER THAN 20'F              maintain subcooling greater than USING FIGURE MIN SUBCOOLING                  20'F using Figure MIN SUBCOOLING and go to Step 29.
: b. Ruptured S/G narrow range level        b. Control charging flow to LESS THAN 90% [85% adverse                maintain  RCS  pressure at CNMT)                                        ruptured  S/G pressure and go to Step 29.
: c. Ruptured S/G narrow range level        c. IF ruptured S/G level STABLE OR DECREASING                      increasing, THEN decrease charging flow to stabilize level. Maintain RCS subcooling greater than '20'F using Figure MIN SUBCOOLING.
29  Check Be If RCS Stopped:
Cooldown Should
: a. RCS  cold leg temperatures  - LESS    a. Return to Step 25.
THAN  350'F
: b. Stop  RCS  cooldown
 
Ql7 .rf~" Vf 'P l p/
Is
 
EOP:          TITLE:
REV: 11 ECA-3.3      SGTR WITHOUT PRESSURIZER PRESSURE    CONTROL PAGE 23    of 27 STEP    ACTION/EXPECTED RESPONSE        RESPONSE  NOT OBTAINED 30  Check  RCS  Pressure  GREATER    Go  to Step 33.
THAN 400 PSIG    [300 PSIG adverse CNMT]
*31  Monitor Ruptured S/G Narrow        Refill ruptured    S/G to 67% [55%
Range Level  GREATER THAN          adverse  CNMT) using feed flow.
174  (25'dverse      CNMT)
IF either of the following conditions occurs, THEN stop feed flow to ruptured S/G:
o  Ruptured S/G pressure    decreases in an  uncontrolled manner.
                                                        -OR-o  Ruptured S/G pressure    increases to 1020 psig.
 
EOP:              titLE:
REV: 11 ECA-3.3          SGTR WITHOUT- PRESSURIZER          PRESSURE    CONTROL PAGE 24  of 27 STEP        ACTION/EXPECTED RESPONSE                  RESPONSE  NOT OBTAINED
  ********            0'    x x  %  x x x x @ **0 **x********x CAUTION
                                                                                **x*****
    ~
o  STEAM SHOULD NOT BE RELEASED FROM A RUPTURED S/G          IF WATER MAY EXIST IN ITS STEAMLINE.
o RUPTURED S/G PRESSURE        MAY DECREASE RAPIDLY WHEN STEAM    IS RELEASED.
  ********0                x*%    x  0*%''    x x w %  x x  0** x****x********
NOTE:    The upper head      region may void during RCS    depressurization if RCPs are not running.        This may result in a rapidly increasing    PRZR  level.
32  Depressurize        RCS And Ruptured S/G  To  400    PSIG    [300 PSIG adverse      CNMT]
: a. Perform the following:
o  Decrease    charging and increase letdown to initiate backfill
                          -OR-o  Initiate    blowdown from ruptured    S/G
                          -OR-o  Dump  steam from ruptured S/G
: b. Check    RCS  pressure    - LESS THAN        b. Return to Step 31.
400  psig [300 psig adverse      CNMTI
: c. Stop  RCS  depressurization
 
1 J
      '~y't ~
v LC+
  '1
~if
 
EOP:            TITLE:
REV: 11 ECA-3.3        SGTR WITHOUT PRESSURIZER          PRESSURE      CONTROL PAGE 25  of 27 STEP      ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED 33  Check Can Be IfEstablished:
RHR Normal    Cooling
: a. RCS  cold leg temperature    - LESS      a. Return to Step 27.
THAN  350'F
: b. RCS  pressure    - LESS THAN              b. Return to Step 31.
400  psig (300 psig adverse    CNMTj
: c. Place  RCS  overpressure                  c. IF  RCS  overpressure  protection protection system in service                  system can    NOT  be placed in (Refer to 0-7, ALIGNMENT AND                  service,  THEN  notify TSC of OPERATION OF THE REACTOR VESSEL                potential    Tech Spec  violation  if OVERPRESSURE PROTECTION SYSTEM)                RHR  system  is placed in service.
: d. Establish    RHR  normal cooling (Refer to Attachment      RHR COOL)
NOTE:  Leakage from ruptured S/G      into  RCS will dilute    RCS  boron concentration.
34  Verify Adequate        Shutdown Margin
: a. Direct  HP to sample RCS and ruptured S/G for boron concentration
: b. Verify boron concentration-              b. Borate as necessary.
GREATER THAN REQUIREMENTS OF FIGURE SDM
 
I Qt
 
EOP:            TITLE:
REV: 11 ECA-3.3        SGTR WITHOUT PRESSURIZER PRESSURE      CONTROL PAGE 26  of 27 STEP      ACTION/EXPECTED RESPONSE        RESPONSE  NOT OBTAINED 35  Initiate    RCS  Cooldown To Cold Shutdown:
: a. Establish and maintain cooldown rate in  RCS  cold legs - LESS THAN  100'F/HR
: b. Use  RHR  system  if in service
: c. Dump  steam to condenser    from  c. Manually or locally dump steam intact  S/G                          from intact S/G using ARVs.
IF  no intact  S/G  available and RHR  system  NOT  in service, THEN use  faulted  S/G.
36  Control Charging Flow To Maintain RCS Subcooling:
: a. RCS  subcooling based on core    a. Increase charging flow to exit  T/Cs - GREATER THAN 20'F        maintain subcooling greater than USING FIGURE MIN SUBCOOLING          20'F using Figure MIN SUBCOOLING and go to Step 37.
: b. Ruptured S/G narrow range level  b. Control charging flow to LESS THAN 90% f85% adverse          maintain RCS pressure at CNMTJ                                ruptured S/G pressure and go to Step 37.
: c. Ruptured S/G narrow range level  c. IF ruptured S/G level STABLE OR DECREASING                increasing, THEN decrease charging flow to stabilize level. Maintain RCS subcooling greater than 20'F using Figure MIN SUBCOOLING.
 
4 C
E (J
-)
P t
 
EOP:            TITLE:
REV  11 ECA-3.3        SGTR WITHOUT PRESSURIZER        PRESSURE      CONTROL PAGE 27 of 27 STEP      ACTION/EXPECTED RESPONSE                  RESPONSE  NOT OBTAINED
*37  Monitor    RCP  Operation:
: a. RCPs  - ANY RUNNING                      a. Go .to Step 39.
: b. Check the following:                      b. Go  to Step 39.
o  RCP  41 seal D/P  - LESS THAN 220 PSID
                        -OR-o  Check    RCP seal leakage  - LESS THAN  0.25  GPM
: c. Stop affected RCP(s) 38  Check Core      Exit T/Cs    LESS          Return to Step 34.
THAN  200'F 39  Evaluate Long      Term  Plant Status:
: a. Maintain cold shutdown conditions
: b. Consult  TSC
                                              -END-
 
I(          C t
tg ht ls 5 < Jl 0
 
EOP:      TITLE REV: 11 ECA-3.3    SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 1  of 1 ECA-3.3 APPENDIX LIST TITLE                                PAGES
: 1) RED PATH  


==SUMMARY==
==SUMMARY==
2)FIGURE MIN SUBCOOLING 3)FIGURE SDM 4)ATTACHMENT RCP START 5)ATTACHMENT N2 PORVS 6)ATTACHMENT RUPTURED S/G 7)ATTACHMENT D/G STOP 8)ATTACHMENT SD-1 9)ATTACHMENT SEAL COOLING 10)ATTACHMENT SD-2 11)ATTACHMENT RHR COOL 12)ATTACHMENT AUX BLDG SW 13)FOLDOUT C I ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV 11 PAGE 1 of 1 RED PATH  
: 2) FIGURE MIN SUBCOOLING
: 3) FIGURE SDM
: 4) ATTACHMENT RCP START
: 5) ATTACHMENT N2 PORVS
: 6) ATTACHMENT RUPTURED S/G
: 7) ATTACHMENT D/G STOP
: 8) ATTACHMENT SD-1
: 9) ATTACHMENT SEAL COOLING
: 10) ATTACHMENT SD-2
: 11) ATTACHMENT RHR COOL
: 12) ATTACHMENT AUX BLDG SW
: 13) FOLDOUT
 
C I
 
REV  11 ECA-3.3   SGTR WITHOUT PRESSURIZER   PRESSURE   CONTROL PAGE 1 of 1 RED PATH  


==SUMMARY==
==SUMMARY==
a.SUBCRITICALITY
: a. SUBCRITICALITY Nuclear power   greater than 5%
-Nuclear power greater than 5%b.CORE COOLING-Core exit T/Cs greater than 1200'F-OR-Core exit T/Cs greater than 700'F AND RVLIS level (no RCPs)less than 43%[464 adverse CNMT)c.HEAT SINK-Narrow range level in all S/Gs less than 5%[25%adverse CNMT]AND total feedwater flow less than 200 gpm d.INTEGRITY-Cold leg temperatures decrease greater than 100'F in last 60 minutes AND RCS cold leg temperature less than 285'F e.CONTAINMENT
: b. CORE COOLING   Core exit T/Cs greater than 1200'F
-CNMT pressure greater than 60 psig a s<i>>11 II fd R,~, f<<4'I ,~
                                      -OR-Core exit T/Cs greater than 700'F AND RVLIS level (no RCPs) less than 43% [464 adverse CNMT)
EOP: ECA-3.3 TITLE SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV 11 PAGE 1 of 1 FIGURE MIN SUBCOOLING NOTE: Subcooling Margin=Saturation Temperature From Figure Below[-j Core Exit T/C Indication RC 2500 2400 2300 2200 2100 2000 1900 1800 1700 1600 1500 1400 1300 1200 1100 1000 900 800 700 600 500 400 300 200 100 0 S PRESSURE (PS IG)RCS PRESSURE INCREMENTS 20 PSIG SUBCOOLED REGION ADVERSE CNMT NORMAL CNMT INADEQUATE SUBCOOLING REGION TEMPERATURE INCREMENTS 10'F 200 250 300 350 400 450 500 550 600 650 700 CORE EXIT SATURATION TEMPERATURE
: c. HEAT SINK   Narrow range   level in all S/Gs   less than 5%
('F)  
[25% adverse CNMT] AND total feedwater flow less than   200 gpm
/k t~CV lf 1 E g ph ld EOP: ECA-3'TITLE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV: 11 PAGE 1 of 1 FIGURE SDM NOTE: o Curve includes allowance for one stuck rod.Add 100 ppm for each additional stuck rod.o To obtain core burnup, use PPCS turn on code BURNUP.BORON CONCENTRATION (PPH)1800 1600 BORON INCREMENTS 20 PPM 1400 1200 1000 ADEQUATE SDM 100 PPM CONSERVATISM INCLUDED 800 600 400 BORATE 200 BURNUP INCREMENTS 100 HWD/HTU 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 CYCLE 24 BURNUP (HWD/MTU) wS J l(g)E4 EOP: ECA-3.3 Tl'fLE: SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV 11 PAGE 1 of 1 FOLDOUT PAGE SI REINITIATION CRITERIA IF EITHER condition listed below occurs, THEN manually operate SI pumps as necessary and go to ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT-SUBCOOLED RECOVERY DESIRED, Step 1: o RCS subcooling based on core exit TCs-LESS THAN O'F USING REQUIREMENTS OF FIGURE MIN SUBCOOLING OR o RVLIS level (no RCPs)-LESS THAN 684[734 adverse CNMT]2.SECONDARY INTEGRITY CRITERIA IF any S/G pressure is decreasing in an uncontrolled manner or is completely depressurized AND has not been isolated, THEN go to E-2, FAULTED S/G ISOLATION, Step 1, unless faulted S/G needed for RCS cooldown.3.COLD LEG RECIRCULATION SWITCHOVER CRITERION IF RWST level decreases to less than 28<, THEN go to ES-1.3, TRANSFER TO COLD LEG RECIRCULATION, Step l.4.AFW SUPPLY SWITCHOVER CRITERION IF CST level decreases to less than 5 feet, THEN switch to alternate AFW water supply (Refer to ER-AFW.l, ALTERNATE WATER SUPPLY TO AFW PUMPS).  
: d. INTEGRITY Cold   leg temperatures decrease greater than 100'F in last 60 minutes AND RCS cold leg temperature less than 285'F
,~;.rfi A,'1 (t ,/V}}
: e. CONTAINMENT CNMT   pressure greater than   60 psig
 
a   s
  <i>>
11 II fd R,
  ~,
f
  <<4 'I
, ~
 
EOP:           TITLE REV  11 ECA-3.3       SGTR WITHOUT PRESSURIZER         PRESSURE CONTROL PAGE 1   of 1 FIGURE MIN SUBCOOLING NOTE:   Subcooling Margin = Saturation Temperature From Figure Below   [-j Core Exit T/C Indication RC S PRESSURE  (PS IG) 2500 2400 RCS PRESSURE 2300 INCREMENTS 20 PSIG 2200 2100 2000 1900 1800 1700 1600 1500 1400 SUBCOOLED 1300                           REGION 1200 1100 1000 900 800 700                                                                 INADEQUATE SUBCOOLING 600     ADVERSE CNMT                                                REGION 500 400 300 200                                         NORMAL CNMT                   TEMPERATURE INCREMENTS 10'F 100 0
200     250       300   350     400     450     500   550     600     650     700 CORE   EXIT SATURATION TEMPERATURE ('F)
 
        /
k t~
CV lf 1
E g ph ld
 
EOP:             TITLE:
REV: 11 ECA-3 '         SGTR WITHOUT PRESSURIZER       PRESSURE   CONTROL PAGE 1 of 1 FIGURE SDM NOTE:     o Curve includes allowance for one stuck rod. Add 100 ppm for each additional stuck rod.
o To obtain core burnup, use PPCS turn on code BURNUP.
BORON CONCENTRATION     (PPH) 1800 BORON INCREMENTS 20 PPM 1600 1400 ADEQUATE SDM 1200                                                        100 PPM CONSERVATISM INCLUDED 1000 800 600 400 BORATE 200                                                                       BURNUP INCREMENTS 100 HWD/HTU 0   1000     2000   3000   4000   5000   6000 7000   8000   9000 10000   11000 12000 CYCLE 24 BURNUP (HWD/MTU)
 
wS J
l(g
    )
E4
 
EOP:           Tl 'fLE:
REV  11 ECA-3.3       SGTR WITHOUT PRESSURIZER     PRESSURE CONTROL PAGE 1 of 1 FOLDOUT PAGE SI REINITIATION CRITERIA IF EITHER condition listed below occurs, THEN manually operate SI pumps as necessary and go to ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT SUBCOOLED RECOVERY DESIRED,         Step 1:
o RCS       subcooling based on core exit   TCs LESS THAN O'F USING REQUIREMENTS OF FIGURE MIN SUBCOOLING OR o RVLIS       level (no RCPs)   LESS THAN 684 [734 adverse CNMT]
: 2. SECONDARY INTEGRITY CRITERIA IF any S/G pressure is decreasing in an uncontrolled manner or is completely depressurized AND has not been isolated, THEN go to E-2, FAULTED S/G ISOLATION, Step 1, unless faulted S/G needed for RCS cooldown.
: 3. COLD LEG RECIRCULATION SWITCHOVER CRITERION IF RWST level decreases to less than 28<, THEN go to ES-1.3, TRANSFER TO COLD LEG RECIRCULATION, Step l.
: 4. AFW SUPPLY SWITCHOVER CRITERION IF CST level decreases to less than 5 feet, THEN switch to alternate AFW water supply (Refer to ER-AFW.l, ALTERNATE WATER SUPPLY TO AFW PUMPS).
 
                    ~
A,'1 (t
    ;.rfi
,/ V}}

Latest revision as of 04:27, 4 February 2020

Rev 14 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant- Saturated Recovery Desired.
ML17309A575
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/20/1995
From: Marlow T
ROCHESTER GAS & ELECTRIC CORP.
To:
References
ECA-3.2, NUDOCS 9504280023
Download: ML17309A575 (127)


Text

EOP: T!TLE:

REV 14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2 SATURATED RECOVERY DESIRED PAGE 1 of 25 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER TECHNICAL REVIEW PORC REVIEW DATE PLANT SUPERINTENDENT Wad-%

EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:

<C'r~~i

~v~U ou 9504280023 950420 0 PDR ADOCK 05000244 (

...P ,, ,PDR, ~

t,

fw I E

EOP:

REV 14 SGTR WITH LOSS OF REACTOR COOLANT FCA-3.2 SATURATED RECOVERY DESIRED PAGE 2 of 25 A. PURPOSE This procedure provides actions to cool down and depressurize the RCS to cold shutdown conditions while minimizing loss of RCS inventory and voiding in the RCS.

B. ENTRY CONDITIONS/SYMPTOMS

1. ENTRY CONDITIONS This procedure is entered from:
a. ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT-SUBCOOLED RECOVERY DESIRED, when RWST level is low without a corresponding increase in containment sump level.
b. ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT SUBCOOLED RECOVERY DESIRED, when the ruptured S/G level is high and plant staff selects saturated recovery method.

E gY 1( w

EOP: TITLE SGTR WITH LOSS OF REACTOR COOLANT REV 14 ZCA-3.2 SATURATED RECOVERY DESIRED PAGE 3 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION IF RWST LEVEL DECREASES TO LESS THAN 28%, THEN THE SI SYSTEM SHOULD BE ALIGNED FOR COLD LEG RECIRCULATION USING ES-1.3, TRANSFER TO COLD LEG RECIRCULATION.

NOTE: o Steps 1 through 15 of ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT SUBCOOLED RECOVERY DESIRED, should be performed before continuing with this procedure.

o FOLDOUT page should be open and monitored periodically.

o Adverse CNMT values should be used whenever CNMT pressure is greater than 4 psig or CNMT radiation is greater than 10+ R/hr.

1 Add Makeup To RWST As Necessary:

o Refer to S-9J, BLENDING TO RWST

-OR-o Refer to S-3.2D, TRANSFERRING WATER FROM CVCS HUT(S) TO RWST TO SFP

-OR-o Refer to Attachment SFP-RWST

I C g.g l

EOP: TITLE:

REV: 14 SGTR WITH LOSS OF REACTOR COOLANT RCA-3.2 SATURATED RECOVERY DESIRED PAGE 4 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION o IF OFFSITE POWER IS LOST AFTER SI RESET, THEN SELECTED SW PUMPS AND ONE CCW PUMP WILL AUTO START ON EMERGENCY D/G. MANUAL ACTION WILL BE REQUIRED TO RESTART SAFEGUARDS EQUIPMENT.

o RCS PRESSURE SHOULD BE MONITORED. IF RCS PRESSURE DECREASES TO LESS THAN 250 PSIG [465 PSIG ADVERSE CNMT], THEN THE RHR PUMPS MUST BE MANUALLY RESTARTED TO SUPPLY WATER TO THE RCS.

2 Check Stopped:

If RHR Pumps Should Be

a. Check RCS pressure: a. Go to Step 3.

l) Pressure - GREATER THAN 250 psig [465 psig adverse CNMT]

2) RCS pressure - STABLE OR INCREASING
b. Stop RHR pumps and place in AUTO

EOP: TITLE:

REV 14 SGTR WITH LOSS OF REACTOR COOLANT ZCA-3.2 SATURATED RECOVERY DESIRED PAGE 5 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION IF ANY RUPTURED S/G IS FAULTED, FEED FLOW TO THAT S/G SHOULD REMAIN ISOLATED DURING SUBSEQUENT RECOVERY ACTIONS UNLESS NEEDED FOR RCS COOLDOWN.

  • 3 Monitor Ruptured S/G Level:
a. Narrow range level - GREATER a. IF ruptured S/G NOT faulted, THAN 5% [25% adverse CNMT] THEN perform the following:

l) Maintain feed flow to ruptured S/G until level greater than 5% [25% adverse CNMT].

2) Continue with Step 4. WHEN ruptured S/G level greater than 5% [25% adverse CNMT],

THEN do Steps 3b through e.

b. Close MDAFW pump discharge valve b. Dispatch AO to locally close to ruptured S/G valve.

~ S/G A, MOV-4007

~ S/G B, MOV-4008

c. Pull stop MDAFW pump for ruptured S/G
d. Close TDAFW pump flow control d. Dispatch AO with locked valve valve to ruptured S/G key to locally close TDAFW pump manual feedwater isolation valve

~ S/G A, AOV-4297 to ruptured S/G.

~ S/G B, AOV-4298

~ S/G A, V-4005

~ S/G B, V-4006

e. Verify MDAFW pump crosstie e. Manually close valves.

valves - CLOSED

~ MOV-4000A

~ MOV-4000B

'4 EOP: TITLE: L REV 14 SGTR WITH LOSS OF REACTOR COOLANT ZCA-3 2 SATURATED RECOVERY DESIRED PAGE 6 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 4 Check If S/G Is Intact:

Secondary Side IF any S/G pressure decreasing in an uncontrolled manner OR completely depressurized, THEN o Pressure in both S/Gs - STABLE verify faulted S/G isolated unless OR INCREASING needed for RCS cooldown:

o Pressure in both S/Gs - GREATER ~ Steamlines THAN 100 PSIG ~ Feedlines IF NOT, THEN go to E-2, FAULTED STEAM GENERATOR ISOLATION, Step 1.

CAUTION IF CST LEVEL DECREASES TO LESS THAN 5 FEET, THEN ALTERNATE WATER SOURCES FOR AFW PUMPS WILL BE NECESSARY (REFER TO ER-AFW.l, ALTERNATE WATER SUPPLY TO AFW PUMPS).

NOTE: TDAFW pump flow control valves fail open on loss of IA.

  • 5 Monitor Intact S/G Level:
a. Narrow range level - GREATER a. Maintain total feed 'flow greater THAN 5% [25% adverse CNMT] than 200 gpm until narrow range level greater than 5% [25%

adverse CNMT] in at least one S/G.

b. Control feed flow to maintain b. IF pa<row range level in the narrow range level between 17% intact S/G continues to increase

[25% adverse CNMT] and 50% in an uncontrolled manner, THEN consider isolating unnecessary release paths:

~ TDAFW pump steam supply valves

~ S/G blowdown valves

~ Refer to Attachment RUPTURED S/G

k t

tf Lw

EOP:

REV: 14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2 SATURATED RECOVERY DESIRED PAGE 7 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Shutdown margin should be monitored during RCS cooldown. Refer to Figure SDM.

6 Initiate RCS Cooldown To Cold Shutdown:

a. Establish and maintain cooldown rate in RCS cold legs - LESS THAN 100'F/HR
b. Use RHR system if in service
c. Dump steam to condenser from c. Manually or locally dump steam intact S/G using intact S/G ARV.

IF no intact S/G available, THEN perform the following:

o Use faulted S/G.

-OR-o IF RHR system NOT in service, THEN use ruptured S/G.

7 Check RCS Subcooling Based On Go to Step 19.

Core Exit T/Cs GREATER THAN O'F USING FIGURE MIN SUBCOOLING 8 Check Safeguards Pump Status Go to Step 15.

o SI pumps - ANY RUNNING

-OR-o RHR pumps - ANY RUNNING IN INJECTION MODE

dp EOP: TITLE SGTR WITH LOSS OF REACTOR COOLANT REV: 14 T"CA-3 . 2 SATURATED RECOVERY DESIRED PAGE 8 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 9 Place PRZR Heater Switches In The Following Positions:

o PRZR heater control group - PULL STOP o PRZR heater backup group - OFF I

CAUTION VOIDING MAY OCCUR IN THE RCS DURING RCS DEPRESSURIZATION. THIS WILL RESULT IN A RAPIDLY INCREASING PRZR LEVEL.

NOTE: o, If auxiliary spray is in use, spray flow may be increased by closing normal charging valve AOV-294 and normal PRZR spray valves.

o When using PRZR PORV, select one with an operable block valve.

10 Depressurize RCS To Refill PRZR:

a. Use normal PRZR spray valve a. Use one PRZR PORV. IF IA NOT associated with running RCP available, THEN refer to Attachment N2 PORVS.

~ PCV-431A for A RCP

~ PCV-431B for B RCP IF no PORV available, THEN use auxiliary spray valve.

b. PRZR level - GREATER THAN 13% b. Continue with Step ll. WHEN

[40% adverse CNMT] level greater than 13% [40%

adverse CNMT], THEN stop RCS depressurization.

c. Stop RCS depressurization

0

\ '"

fO' t

TITLE:

REV: 14 SGTR WITH LOSS OF REACTOR COOLANT FCA-3.2 SATURATED RECOVERY DESIRED PAGE 9 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION o IF RCP SEAL COOLING HAD PREVIOUSLY BEEN LOST, THEN THE AFFECTED RCP SHOULD NOT BE STARTED PRIOR TO A STATUS EVALUATION.

o INADVERTENT CRITICALITY MAY OCCUR FOLLOWING NATURAL CIRCULATION COOLDOWN IF THE RCP IN THE RUPTURED LOOP IS STARTED FIRST.

ll Check Started:

If An RCP Should Be

a. Both RCPs - STOPPED a. Stop all but one RCP and go to Step 12.
b. RCS subcooling based on core b. Go to Step 19.

exit T/Cs - GREATER THAN O' USING FIGURE MIN SUBCOOLING

c. PRZR level - GREATER THAN 13% c. Return to Step 10.

[40% adverse CNMT]

d. Try to start an RCP
1) Establish conditions for starting an RCP o Bus 11A or 11B energized o Refer to Attachment RCP START
2) Start one RCP

I v

0 Ep

EOP:

SGTR WITH LOSS OF REACTOR COOLANT REV: 14

,ECA-3.2 SATURATED RECOVERY DESIRED PAGE 10 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 12 Check Pumps If One Should Of Three SI Be Stopped:

a. Three SI pumps - RUNNING a. Go to Step 13.
b. RCS subcooling based on core b. IF RCS hot leg temperatures exit T/Cs - GREATER THAN 10'F greater than 320'F [310'F

[10'F adverse CNMT] USING FIGURE adverse CNMT] OR IF RHR normal MIN SUBCOOLING cooling in service, THEN go to Step 19.

IF RHR normal cooling NOT in service AND RCS hot leg temperatures less than 320'F

[310'F adverse CNMT], THEN ensure at least one RHR pump running in injection mode and go to Step 12c. IF no RHR pump can be operated in injection mode, THEN go to Step 19.

c. Check PRZR level - GREATER THAN c. Do NOT stop SI pump. Return to 13% [40% adverse CNMT] Step 10.
d. Stop one SI pump

REV 14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2 SATURATED RECOVERY DESIRED PAGE 11 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 13 Check Should IfBe OneStopped:

Of Two SI Pumps

a. Two SI pumps - RUNNING a. Go to Step 14.
b. RCS subcooling based on core b. IF RCS hot leg temperatures exit T/Cs - GREATER THAN 35'F greater than 320'F [310'F

[35'F adverse CNMT] USING FIGURE adverse CNMT] OR IF RHR normal MIN SUBCOOLING cooling in service, THEN go to Step 19.

IF RHR normal cooling NOT in service AND RCS hot leg temperatures less than 320'F

[310'F adverse CNMT], THEN ensure at least one RHR pump running in injection mode and go to Step 13c. IF no RHR pump can be operated in injection mode, THEN go to Step 19.

c. PRZR level - GREATER THAN 13% c. Do NOT stop SI pump. Return to

[40% adverse CNMT] Step 10.

d. Stop one SI pump

a,l 0 T

T.

2

EOP: TITLES REV: 14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2 SATURATED RECOVERY DESIRED PAGE 12 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 14 Check Be If Last Stopped:

SI Pump Should

a. One SI pump - RUNNING a. IF any RHR pump running in injection mode, THEN go to Step 19. IF NOT, THEN go to Step 15.
b. Determine required RCS subcooling from table:

Charging Pump RCS Subcooling Criteria Availability NONE Insufficient subcooling to stop SI pump.

ONE 215'F [215'F adverse CNMT]

TWO 150'F [150'F adverse CNMT]

THREE 80'F [80'F adverse CNMT]

c. RCS subcooling based on core c. IF RCS hot leg temperatures exit T/Cs - GREATER THAN VALUE greater than 320'F [310'F FROM TABLE ABOVE USING FIGURE adverse CNMT] OR IF RHR normal MIN SUBCOOLING cooling in service, THEN go to Step 19.

IF RHR normal cooling NOT in service AND RCS hot leg temperatures less than 320'F

[310'F adverse CNMT), THEN ensure at least one RHR pump running in injection mode and go to Step 14d. IF no RHR pump can be operated in injection mode, THEN go to Step 19.

d. PRZR level - GREATER THAN 13% d. Do NOT stop SI pump. Return to

[40% adverse CNMT] Step 10.

e. Stop running SI pump

t'4 EOP:

REV 14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2 SATURATED RECOVERY DESIRED I

PAGE 13 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 15 Check Be If Charging Controlled Flow Should To Maintain RCS Inventory:

a. Check RHR pumps - RUNNING IN a. Perform the following:

INJECTION MODE

1) Control charging flow to maintain RCS inventory:

o RVLIS level (no RCPs)

BETWEEN 68% AND 73% [73%

AND 76% adverse CNMT]

-OR-o RVLIS fluid fraction (any RCP running) - BETWEEN 80%

AND 90%

2) Go. to Step 16.
b. Go to Step 19

A l,

C

EOP: TITLE:

REV 14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2 SATURATED RECOVERY DESIRED PAGE 14 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION o IF RCP SEAL COOLING HAD PREVIOUSLY BEEN LOST, THEN THE AFFECTED RCP SHOULD NOT BE STARTED PRIOR TO A STATUS EVALUATION.

o INADVERTENT CRITICALITY MAY OCCUR FOLLOWING NATURAL CIRCULATION COOLDOWN IF THE RCP IN THE RUPTURED LOOP IS STARTED FIRST.

16 Check RCP Status:

a. RCPs - AT LEAST ONE RUNNING a. Perform the following:
1) Establish conditions for starting an RCP:

o Verify bus 11A or 11B energized.

o Refer to Attachment RCP START.

2) Start one RCP.

IF an RCP can NOT be started, THEN verify natural circulation (Refer to Attachment NC).

IF natural circulation NOT verified,'HEN increase dumping steam

b. Stop all but one RCP

~

')

EOP: TITLE:

SGTR WITH LOSS OF REACTOR COOLANT REV: 14 ECA-3.2 SATURATED RECOVERY DESIRED PAGE 15 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION o VOIDING MAY OCCUR IN THE RCS DURING RCS DEPRESSURIZATION. THIS WILL RESULT IN A RAPIDLY INCREASING PRZR LEVEL.

o IF SI HAS BEEN TERMINATED, THE ACCUMS SHOULD BE ISOLATED PRIOR TO DEPRESSURIZING THE RCS TO LESS THAN 1000 PSIG.

NOTE: o If auxiliary spray is in use, spray flow may be increased by closing normal charging valve AOV-294 and normal PRZR spray valves.

o When using PRZR PORV, select one with an operable block valve.

C 17 Depressurize RCS To Saturation At Core Exit:

a. Determine saturation pressure for core exit T/Cs using Figure TSAT
b. Use normal PRZR spray valves b. Use one PRZR PORV. IF IA NOT associated with running RCP available, THEN refer to Attachment N2 PORVS.

~ PCV-431A for A RCP

~ PCV-431B for B RCP IF PORV NOT available, THEN use auxiliary spray valve (AOV-296).

c. Energize PRZR heaters as necessary
d. Depressurize RCS until EITHER of the following conditions satisfied:

o PRZR level - GREATER THAN 75%

[65% adverse CNMT)

-OR-o RCS pressure - AT SATURATION FROM STEP 17a

EOP:

REV: 14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2 SATURATED RECOVERY DESIRED PAGE 16 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 18 Verify Adequate Shutdown Margin

a. Direct RP to sample RCS and ruptured S/G for boron concentration
b. Verify boron concentration- b. Borate as necessary.

GREATER THAN REQUIREMENTS OF FIGURE SDM

  • 19 Monitor SZ Reinitiation Criteria:
a. Core exit T/Cs - DECREASING a. Increase dumping steam.

IF core exit T/Cs do NOT decrease, THEN manually operate SI pumps as necessary.

b. Check RVLIS indication: b. Manually operate SI pumps as necessary.

o Level (no RCPs) - GREATER THAN 68% [73% adverse CNMTj

-OR-o Fluid Fraction (any RCP running) - GREATER THAN 80%

pa~ y

~y

EOP:

REV: 14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2 SATURATED RECOVERY DESIRED PAGE 17 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 20 Check Isolated:

If SI ACCUMs Should Be

a. RCS subcooling based on core a. IF both RCS hot leg temperatures exit T/Cs - GREATER THAN O' less than 400'F, THEN go to USING FIGURE MIN SUBCOOLING Step 20c.

IF NOT, THEN go to Step 21.

b. PRZR level - GREATER THAN 5% b. Return to Step 10.

[30% adverse CNMT]

c. Dispatch AO with locked valve key to locally close breakers for SI ACCUM discharge valves

~ MOV-841, MCC C position 12F

~ MOV-865, MCC D position 12C

d. Close SI ACCUM discharge valves d. Vent any unisolated ACCUMs:

~ MOV-841 1) Open vent valves for

~ MOV-865 unisolated SI ACCUMs.

~ ACCUM A, AOV-834A

~ ACCUM B, AOV-834B

2) Open HCV-945.
e. Locally reopen breakers for MOV-841 and MOV-865

EOP: TITLE:

REV 14 SGTR WITH LOSS OF REACTOR COOLANT

.ECA-3.2 SATURATED RECOVERY DESIRED PAGE 18 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 21 Check If Emergency Should Be Stopped:

D/Gs

a. Verify AC emergency busses a. Try to restore offsite power energized by offsite power: (Refer to ER-ELEC.1, RESTORATION OF OFFSITE POWER).

o Emergency D/G output breakers OPEN o AC emergency bus voltage GREATER THAN 420 VOLTS o AC emergency bus normal feed breakers - CLOSED

b. Stop any unloaded emergency D/G and place in standby (Refer to Attachment D/G STOP) 22 Minimize Secondary System Contamination:
a. Isolate reject from hotwell to a. IF hotwell level, increasing, CST' THEN direct RP to sample hotwells for activity.

Place hotwell level controller (HC-107) in MANUAL at 50%

o Verify hotwell level - STABLE

b. Verify local actions to complete isolation of ruptured S/G (Refer to Attachment RUPTURED S/G)

! l' 4

E,%

V

EOP: TITLE:

REV 14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3 ' SATURATED RECOVERY DESIRED PAGE 19 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 23 Verify Adequate SW Flow To CCW Hx:

a. Verify at least two SW pumps a. Manually start pumps as power RUNNING supply permits (258 kw per pump). IF less than two SW pumps can be operated, THEN go to Step 24.

Verify AUX BLDG SW isolation b. Establish SW to AUX BLDG (Refer valves - OPEN to Attachment AUX BLDG SW).

~ MOV-4615 and MOV-4734

~ MOV-4616 and MOV-4735

c. Verify CNMT RECIRC fan c. Dispatch AO to locally throttle annunciator C-2, HIGH flow to CCW Hx to between TEMPERATURE ALARM - EXTINGUISHED 5000 gpm and 6000 gpm total flow.

24 Check RCP Cooling Establish normal cooling to RCPs (Refer to Attachment SEAL COOLING).

a. Check CCW to RCPs o Annunciator A-7, RCP lA CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED o Annunciator A-15, RCP 1B CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED
b. Check RCP seal injection o Labyrinth seal D/Ps - GREATER THAN 15 INCHES OF WATER

-OR-o RCP seal injection flow to each RCP - GREATER THAN 6 GPM

C EOP: TITLE:

REV 14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2 SATURATED RECOVERY DESIRED PAGE 20 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 25 Check If Seal Return Flow Should Be Established:

a. Verify instrument bus D- a. Perform the following:

ENERGIZED

1) Ensure. steam dump mode control in MANUAL.
2) Restore power to instrument bus D from MCC B or MCC A (maintenance supply).
b. Verify RCP ¹1 seal outlet b. Go to Step 26.

temperature - LESS THAN 235 'F

c. Verify RCP seal outlet valves c. Manually open valves as OPEN necessary.

~ AOV-270A

~ AOV-270B

d. Reset both trains of XY relays for RCP seal return isolation valve MOV-313
e. Open RCP seal return isolation e. Perform the following:

valve MOV-313

1) Place MOV-313 switch to OPEN.
2) Dispatch AO with key to RWST gate to locally open MOV-313
f. Verify RCP ¹1 seal leakoff flow f. Perform the following:

LESS THAN 5.5 GPM

1) Trip the affected RCP
2) Allow 3 minutes for pump coast down, THEN close the affected RCP seal discharge v'al've

~ RCP A, AOV-270A

~ RCP B, AOV-270B IF both RCP seal discharge valves are shut, THEN go to Step 26.

g. Verify RCP ¹1 seal leakoff flow g. Refer t'o AP-RCP.1, RCP SEAL GREATER THAN 0.8 GPM MALFUNCTION.

I 0

EOP: TITLE:

REV 14 SGTR WITH LOSS OF REACTOR COOLANT iECA-3.2 SATURATED RECOVERY DESIRED PAGE 21 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Adverse CNMT conditions or loss of forced air cooling may result in failure of NIS detectors.

26 Check If Source Detectors Should Range Be Energized:

a. Source range channels a. Go to Step 26e.

DEENERGIZED

b. Check intermediate range flux- b. Perform the following:

EITHER CHANNEL LESS THAN 10 10 AMPS 1) IF neither intermediate range channel is decreasing, THEN initiate boration.

2) Continue with Step 27. WHEN flux is LESS THAN 10 1 amps on any operable channel, THEN do Steps 26c, d and e.
c. Check the following: c. Continue with Step 27. WHEN either condition met, THEN do o Both intermediate range Steps 26d and e.

channels - LESS THAN 10 10 AMPS

-OR-o Greater than 20 minutes since reactor trip

d. Verify source range detectors d. Manually energize source range ENERGIZED detectors by depressing P-6 permissive defeat pushbuttons (2 of 2).

IF source ranges can NOT be restored, THEN refer to ER-NIS 1, SR MALFUNCTION and go

~

to Step 27.

e. Transfer Rk-45 recorder to one source range and one intermediate range channel

lag

~'

<l'C~

'0

EOP: TITLE:

REV 14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2 SATURATED RECOVERY DESIRED PAGE 22 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 27 Establish Normal Shutdown Alignment:

a. Check condenser - AVAILABLE a. Dispatch AO to perform Attachment SD-2.
b. Perform the following:

o Open generator disconnects

~ 1G13A71

~ 9X13A73 o Place voltage regulator to OFF o Open turbine drain valves o Rotate reheater steam supply controller cam to close valves o Place reheater dump valve switches to HAND o Stop all but one condensate pump

c. Verify adequate Rx head cooling:.
1) Check IA to CNMT - AVAILABLE 1) Go to Step 28.
2) Verify at least one control 2) Manually start one fan as rod shroud fan - RUNNING power supply permits (45 kw)
3) Verify one Rx compartment 3) Perform the following:

cooling fan - RUNNING o Dispatch AO to reset UV relays at MCC C and MCC D.

o Manually start one fan as power supply permits (23 kw).

d. Verify Attachment SD COMPLETE

EOP: TITLE:

SGTR WITH LOSS OF REACTOR COOLANT REV 14 ZCA-3. 2 SATURATED RECOVERY DESIRED PAGE 23 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION FEED FLOW SHOULD NOT BE ESTABLISHED TO ANY RUPTURED S/G WHICH IS ALSO FAULTED UNLESS IT IS NEEDED FOR RCS COOLDOWN.

  • 28 Monitor Ruptured S/G(s) Refill ruptured S/G to 67% [55%

Narrow Range Level GREATER adverse CNMT] using feed flow.

THAN 17% [254 adverse CNMT]

IF either of the following conditions occurs, THEN stop feed flow to ruptured S/G unless needed for RCS cooldown:

o Ruptured S/G pressure decreases in an uncontrolled manner.

-OR-o Ruptured S/G pressure increases to 1020 psig.

  • 29 Monitor RCP Operation:
a. RCPs - ANY RUNNING a. Go to Step 30.
b. Check the following: b. Stop the affected RCP(s).

o RCP 81 seal D/P - GREATER THAN 220 PSID o Check RCP seal leakage-WITHIN THE NORHAL OPERATING RANGE OF FIGURE RCP SEAL LEAKOFF

4's Mi

,p

EOP: TITLE:

REV: 14 SGTR WITH LOSS OF REACTOR COOLANT ECA-3.2 SATURATED RECOVERY DESIRED PAGE 24 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 30 Check Condenser Steam Dump Use intact S/G ARV for RCS Available CONDENSER VACUUM temperature control.

GREATER THAN 20 INCHES HG 31 Check Can Be IfEstablished:

RHR Normal Cooling

a. RCS cold leg temperature - LESS a. Go to Step 32.

THAN 350'F

b. RCS pressure - LESS THAN b. Go to Step 32.

400 psig [300 psig adverse CNMT]

c. Place letdown pressure controller in MANUAL CLOSED
d. Check following valves - OPEN d. Perform the following:

~ AOV-371, letdown isolation 1) Reset both trains of XY valve relays for AOV-371 and

~ AOV-427, loop B cold leg to AOV-427.

REGEN Hx

~ At least one letdown orifice 2) Open AOV-371 and AOV-427.

valve (AOV-200A, AOV-200B, or AOV-202) 3) Open one letdown orifice valve.

e. Verify pressure on PI-135 - LESS e. Go to Step 32.

THAN 400 PSIG

f. Place RCS overpressure protection system in service (Refer to 0-7, ALIGNMENT AND OPERATION OF THE REACTOR VESSEL OVERPRESSURE PROTECTION SYSTEM)
g. Consult TSC to determine if RHR normal cooling should be established using Attachment RHR COOL

0 EOP:

REV: 14 SGTR WITH LOSS OF REACTOR COOLANT

'ECA-3.2 SATURATED RECOVERY DESIRED PAGE 25 of 25 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: This procedure should be continued while obtaining CNMT hydrogen sample in Step 32.

32 Check CNMT Hydrogen Concentration:

a. Direct RP to start CNMT hydrogen monitors as necessary
b. Hydrogen concentration - LESS b. Consult TSC to determine if THAN 0.5% hydrogen recombiners should be placed in service.

33 Check Core Exit T/Cs LESS Return to Step 2.

THAN 200'F 34 Evaluate Long Term Plant Status:

a. Maintain cold shutdown conditions
b. Consult TSC

-END-

EOP:

REV: 14 SGTR WITH LOSS OF REACTOR COOLANT

%CA-3.2 SATURATED RECOVERY DESIRED PAGE 1 of 1 ECA-3.2 APPENDIX LIST TITLE PAGES

1) RED PATH

SUMMARY

2) FIGURE MIN SUBCOOLING
3) FIGURE SDM
4) FIGURE TSAT
5) FIGURE RCP SEAL LEAKOFF
6) ATTACHMENT SFP-RWST
7) ATTACHMENT N2 PORVS
8) ATTACHMENT NC
9) ATTACHMENT SEAL COOLING
10) ATTACHMENT RCP START
11) ATTACHMENT D/G STOP
12) ATTACHMENT AUX BLDG SW
13) ATTACHMENT RUPTURED S/G
14) ATTACHMENT SD-1
15) ATTACHMENT SD-2
16) ATTACHMENT RHR COOL
17) FOLDOUT

h \

gt 1<

I,tt l1 I I

EOP:

SGTR WITH LOSS OF REACTOR COOLANT REV: 14 ECA-3.2 SATURATED RECOVERY DESIRED PAGE 1 of 1 RED PATH

SUMMARY

a. SUBCRITICALITY Nuclear power greater than 5%
b. CORE COOLING Core exit T/Cs greater than 1200'F

-OR-Core exit T/Cs greater than 700'F AND RVLIS level (no RCPs) less than 434 [46%

adverse CNMT]

c. HEAT SINK Narrow range level in all S/Gs less than 54

[25% adverse CNMT] AND total feedwater flow less than 200 gpm

d. INTEGRITY Cold leg temperatures decrease greater than 100'F in last 60 minutes AND RCS cold leg temperature less than 285'F
e. CONTAINMENT CNMT pressure greater than 60 psig

e rP 4I' I

A'y I k 4

0

EOP: TITLE:

REV 14 SGTR WITH LOSS OF REACTOR COOLANT KCA-3.2 SATURATED RECOVERY DESIRED PAGE 1 of 1 FIGURE MIN SUBCOOLING NOTE: Subcool'ing Margin = Saturation Temperature From Figure Belov [-] Core Exit T/C Indication RC S PRESSURE (PSIG) 2500 2400 RCS PRESSURE 2300 INCREMENTS 20 PSIG 2200 2100 2000 1900 1800 1700 1600 1500 1400 SUBCOOLED 1300 REGION 1200 1100 1000 900 800 INADEQUATE 700 SUBCOOL ING 600 ADVERSE C NMT REGION 500 400 300 200 NORMAL CNMT TEMPERATURE INCREMENTS 10'F 100 0

200 250 300 350 400 450 500 550 600 650 700 CORE EXIT SATURATION TEMPERATURE ( F)

I

~ i <

, Sw I

J S

E

+IS S

lp g ,'ii

EOP: TITLE:

REV 14 SGTR WITH LOSS OF REACTOR COOLANT SCA-3.2 SATURATED RECOVERY DESIRED PAGE 1 of 1 FIGURE SDM NOTE: o Curve includes allowance for one stuck rod. Add 100 ppm for each additional stuck rod.

o To obtain core burnup, use PPCS point ID BURNUP.

BORON CONCENTRATION (PPH) 1800 BORON INCREMENTS 20 PPM 1600 1400 ADEQUATE SDH 1200 100 PPH CONSERVATISM INCLUDED 1000 800 600 400 200 BURNUP INCREMENTS 100 HWD/HTU 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 CYCLE 25 BURNUP (MWD/HTU)

~ 1 p

4i

'~ ~

I

4 '1 tpq sr~'

EOP: TITLE:

REV: 14

'ECA-3.2 SGTR WITH LOSS OF REACTOR COOLANT SATURATED RECOVERY DESIRED PAGE 1 of 1 FIGURE TSAT SAT URATION PRESSURE (PSIG) 2500 2400 PRESSURE 2300 INCREMENTS 20 PSIG 2200 2100 2000 1900 1800 1700 1600 1500 1400 1300 1200 1100 1000 900 800 700 600 500 400 300 TEMPERATURE 200 INCREMENTS 10'F 100 0

20 0 250 300 350 400 450 500 550 600 650 700 CORE EXIT SATURATION TEMPERATURE (')

k

'4 1 ~

4 ~

~

~

4 AQ f

EOP: T!TLE REV: 14 SGTR WITH LOSS OF REACTOR COOLANT

+CA-3. 2 SATURATED RECOVERY DESIRED PAGE 1 of 1 FIGURE RCP SEAL LEAKOFF

¹1 SEAL LEAK RATE (GPM) 6 LEAK RATE INCREMENTS 0.2 GPM NORMAL OPERATING RANGE DP INCREMENTS 50 PSI 250 500 750 1000 1250 1500 1750 2000 2250 2500

¹I SEAL DP (RCS PRESS - VCT PRESS) PSI

A>>

4

~"

EOP: TITLE:

SGTR WITH LOSS OF REACTOR COOLANT REV 14

~ECA-3.2 SATURATED RECOVERY DESIRED PAGE 1 of 1 FOLDOUT PAGE 1 ~ SI REINITIATION CRITERIA IF EITHER condition listed below occurs, THEN manually operate SI pumps as necessary:

o Core exit T/Cs INCREASING

-OR-o Check RVLIS indication:

Level (no RCPs) LESS THAN 684 [734 adverse CNMT]

Fluid fraction (any RCP running) LESS THAN 80%

2 ~ SECONDARY INTEGRITY CRITERIA IF any S/G pressure is decreasing in an uncontrolled manner or is completely depressurized, and has not been isolated, THEN go to E-2, FAULTED S/G ISOLATION, Step 1, unless faulted S/G needed for RCS cooldown.

3. COLD LEG RECIRCULATION SWITCHOVER CRITERION IF RWST level decreases to less than 28%, THEN go to ES-1.3, TRANSFER TO COLD LEG RECIRCULATION, Step 1.
4. LOSS OF EMERGENCY COOLANT RECIRCULATION CRITERION IF emergency coolant recirculation is established and subsequently lost, THEN go to ECA-1.1, JOSS OF EMERGENCY COOLANT RECIRCULATION, 'Step 1.
5. AFW SUPPLY SWITCHOVER CRITERION IF CST level decreases to less than 5 feet, THEN switch to alternate AFW water supply (Refer to ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS).

I n

C

EOP: TITLE:

REV 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 1 of 27 RO ESTER GAS AND ELECTRIC CORPORATION GINNA STATION CON OLLED COPY NUMBER TEC ICAL REVIEW PORC REVIEW DATE PLANT UPERINTE ENT cg cg EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:

~i EOP:

REV: 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 2 of 27 A. PURPOSE This procedure provides actions for a SGTR with coincident loss of normal and auxiliary PRZR sprays and PORVs.

B. ENTRY CONDITIONS/SYMPTOMS

1. ENTRY CONDITIONS This procedure is entered from:
a. E-3, STEAM GENERATOR TUBE RUPTURE, when PRZR pressure control is not available.

~p lp eI lg Ot k

P j

b~

EOP: TITLE:

REV: 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 3 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: o Foldout page should be open AND monitored periodically.

o Adverse CNMT values should be used whenever CNMT pressure is greater than 4 psig or CNMT radiation is greater than 10+ R/hr.

1 Check Ruptured S/G Narrow Go to Step 8.

Range Level LESS THAN 67:

[55% adverse CNMT]

2 Check RCP Status AT LEAST Try to start one RCP:

ONE RUNNING

a. Establish conditions for starting RCP.

o Bus 11A and Bus 11B energized o Refer to Attachment RCP START

b. Start one RCP. IF no RCP can be started, THEN go to Step 4.

3 Check IF Normal PRZR Spray Available:

a. Verify IA to CNMT - AVAILABLE a. Perform the following:
1) Place PRZR heater control group to PULL STOP.
2) Place PRZR heater backup group to OFF.
3) Place normal spray valve controllers to MANUAL at 0%.
4) Go to Step 4.
b. Go to E-3, STEAM GENERATOR TUBE RUPTURE, Step 21

'be( m i.

'J l~

4

EOP: TITLE REV: 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 4 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 4 Try To Restore PRZR PORV:

a. Block valves - AT LEAST ONE OPEN a. Open one block valve unless it was closed to isolate an open

~ MOV-516 for PCV-430 PORV.

~ MOV-515 for PCV-431C If block valves can NOT be opened, THEN dispatch AO to locally ensure breakers to block valves closed.

~ MOV-515, MCC C position 6C

~ MOV-516, MCC D position 6C

b. Check IA to CNMT - AVAILABLE b.. Refer to Attachment N2 PORVS to operate PORVs.
c. Verify at least one PRZR PORV c. Go to Step 5.

flow path - AVAILABLE

d. Go to E-3, STEAM GENERATOR TUBE RUPTURE, Step 22

+RI

~

< g3r~g Np Y'>

I, t

I

EOP: T I 1'LE:

REV: 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 5 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: If auxiliary spray is the only means of RCS pressure control, THEN the 320'F hT limit between the spray line and PRZR does not apply.

5 Try To Establish Auxiliary Spray:

a. Charging pumps - AT LEAST ONE a. Perform the following:

RUNNING

1) IF CCW flow is lost to any RCP thermal barrier OR any RCP ¹1 seal outlet temperature offscale high, THEN locally isolate seal injection to affected RCP.

~ RCP A, V-300A

~ RCP B, V-300B

2) Ensure HCV-142 demand at 0%.
3) Start charging pumps as necessary.

IF charging not available, THEN go to Step 6.

b. Establish auxiliary spray flow: b. IF auxiliary spray can NOT be established, THEN go to Step 6.
1) Open auxiliary spray valve (AOV-296)
2) Close charging valve to loop B cold leg (AOV-294)
c. Go to E-3, STEAM GENERATOR TUBE RUPTURE, Step 21b

TY" V'

I fJk f4

EOP: TITLE:

REV 11 ECA-3.3 'SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 6 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

  • xx**x*x*xxx***%>xxxxxxxxx%x*xxx*******

CAUTION IF CST LEVEL DECREASES TO LESS THAN 5 FEET, THEN ALTERNATE WATER SOURCES FOR AFW PUMPS WILL BE NECESSARY (REFER TO ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS).

                          • x ** *************

x x**********

NOTE: TDAFW pump flow control valves fail open on loss of IA.

  • 6 Monitor Intact S/G Level:
a. Narrow range level - GREATER a. Maintain total feed flow greater THAN 5% [25% adverse CNMT] than 200 gpm until narrow range level greater than 5% [25%

adverse CNMT] in at least one S/G.

b. Control feed flow to maintain b. IF narrow range level in intact narrow range level between 17% S/G continues to increase in an

[25% adverse CNMT] and 50% uncontrolled manner, THEN go to ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT - SUBCOOLED RECOVERY DESIRED, Step 1.

7 Check PRZR Level GREATER Return to Step 1.

THAN 5% (30< adverse CNMT]

tw '

P

EOP: TITLE:

REV: 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 7 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 8 Check If SI Can Be Terminated:

a. RCS subcooling based on core a. Do NOT stop SI pumps. Go to exit T/Cs - GREATER THAN O' ECA-3.1, SGTR WITH LOSS OF USING FIGURE MIN SUBCOOLING REACTOR COOLANT - SUBCOOLED RECOVERY DESIRED, Step 1.
b. Secondary heat sink: b. IF neither condition satisfied, THEN do NOT stop SI pumps. Go o Total feed flow to S/Gs to ECA-3.1, SGTR WITH LOSS OF GREATER THAN 200 GPM AVAILABLE REACTOR COOLANT - SUBCOOLED RECOVERY DESIRED, Step l.

-OR-o Narrow range level in intact S/G - GREATER THAN 5% (25%

adverse'NMTj

c. RVLIS indication c. SI pumps. Go to o Level (no RCPs) - GREATER Do NOT ECA-3 ',stop SGTR WITH LOSS OF REACTOR COOLANT - SUBCOOLED THAN 68% [73% adverse CNMT] RECOVERY DESIRED, Step 1.

-OR-o Fluid fraction (any RCP running) - GREATER THAN 80%

d. Any ruptured S/G narrow range d. Do NOT stop SI pumps. Return to level - INCREASING IN AN Step 2.

UNCONTROLLED MANNER OR OFFSCALE HIGH

f If%, fl 4t j,t

EOP: TITLE:

REV: 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 8 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 9 Stop SI Pumps and Place In AUTO

r 1g

't t %

I"

~ ew

/a f

R I

EOP: TITLE:

REV 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 9 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 10 Check Been If Charging Established:

Flow Has

a. Charging pumps - ANY RUNNING a. Perform the following:
1) IF CCW flow is lost to any RCP thermal barrier OR any RCP ¹1 seal outlet temperature offscale high, THEN dispatch AO with key to RWST gate to close seal injection needle valve(s) to affected RCP:

~ RCP A, V-300A

~ RCP B, V-300B

2) Ensure HCV-142 open, demand at OS.
b. Charging pump suction aligned to b. Manually align valves as RWST: necessary. IF LCV-112B can NOT be opened, THEN perform the o LCV-112B - OPEN following.')

o LCV-112C - CLOSED Verify charging pump A NOT running and place in PULL STOP.

2) Dispatch AO to locally open manual charging pump suction from RWST (V-358 located in charging pump room).
3) WHEN V-358 open, THEN direct AO to close V-268 to isolate charging pumps B and C from VCT (V-268 located in charging pump room).
c. Start charging pumps as necessary and adjust charging flow to restore PRZR level

~ '

~

4

TITLE:

EOP:

REV'1 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 10 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

  • 11 Monitor RCS Inventory: Perform the following:

o RCS subcooling based on core a. Manually operate SI pumps as exit T/Cs - GREATER THAN O' necessary.

USING FIGURE MIN SUBCOOLING

b. Go to ECA-3.1, SGTR WITH LOSS OF o RVLIS indication REACTOR COOLANT - SUBCOOLED RECOVERY DESIRED, Step l.

o Level (no RCPs) - GREATER THAN 68% f73% adverse CNMT]

-OR-o Fluid fraction (any RCP rLInning) - GREATER THAN 80%

12 Verify Adequate SW Flow To CCW Hx:

a. Verify at least two SW pumps a. Manually start pumps as power RUNNING supply permits (258 kw per pump). IF less than two SW pumps can be operated, THEN go to Step 20.
b. Verify AUX BLDG SW isolation b. Establish SW to AUX BLDG (Refer valves - OPEN to Attachment AUX BLDG SW).

~ MOV-4615 and MOV-4734

~ MOV-4616 and MOV-"4735

c. Verify CNMT RECIRC fan c. Dispatch AO to locally throttle annunciator C-2, HIGH flow to CCW Hx to between TEMPERATURE ALARM - EXTINGUISHED 5000 gpm and 6000 gpm total flow.

4

  • J t

EOP: TITLE:

REV: 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 11 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 13 Check If Normal CVCS Operation Can Be Established

a. Verify IA restored: Continue with Step 17. WHEN IA restored, THEN do Steps 13 o IA to CNMT (AOV-5392) - OPEN through 16.

o IA pressure - GREATER THAN 60 PSIG

b. Verify instrument bus D b. Energize MCC B. IF MCC B NOT ENERGIZED available, THEN perform the following:
1) Verify MCC A energized.
2) Place instrument bus D on maintenance supply.
c. CCW pumps - ANY RUNNING c. Perform the following:
1) IF any RCP ¹1 seal outlet temperature offscale high, THEN isolate CCW to thermal barrier of affected RCP(s).

~ RCP A, MOV-749A and MOV-759A

~ RCP B, MOV-749B and MOV-759B

2) Manually start one CCW pumps
d. Charging pump - ANY RUNNING d. Continue with Step 20. WHEN any charging pump running, THEN do Steps 14 through 17.

f*

'P

EOP:

ECA-3.3 TlTLE:

SGTR WITHOUT PRESSURIZER PRESSURE CONTROL REV ll PAGE 12 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: If PRZR level is less than 13%, letdown may be established by placing AOV-427 to OPEN.

14 Establish Normal Letdown: IF RCP seal return has been established, THEN establish excess

a. Establish charging line flow to letdown as follows:

REGEN Hx - GREATER THAN 20 GPM o Place excess letdown divert

b. Place the following switches to valve, AOV-312, to NORMAL.

CLOSE:

o Ensure CCW from excess letdown

~ Letdown orifice valves open, (AOV-745).

(AOV-200A, AOV-200B, and AOV-202) o Open excess letdown isolation

~ AOV-371, letdown isolation valve AOV-310.

valve

~ AOV-427, loop B cold leg to o Slowly open HCV-123 to maintain REGEN Hx excess letdown temperature less than 195'F and pressure less

c. Place letdown controllers in than 100 psig.

MANUAL at 40% open o Adjust charging pump speed as

~ TCV-130 necessary.

~ PCV-135 IF RCP seal return NOT established,

d. Reset both for trains of AOV-371 and AOV-427 XY relays THEN consult TSC to determine excess letdown should be placed in if service.
e. Open AOV-371 and AOV-427
f. Open letdown orifice valves as necessary
g. Place TCV-130 in AUTO at 105'F
h. Place PCV-135 in AUTO at 250 psig
i. Adjust charging pump speed and HCV-142 as necessary

il Ij l I/g al "V

E-"

f

1' TLE:

EOP:

REV 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 13 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 15 Check VCT Makeup System:

P

a. Adjust boric acid flow control valve in AUTO to 9.5 gpm
b. Verify the following: b. Adjust controls as necessary.
1) RMW mode selector switch in AUTO
2) RMW control armed - RED LIGHT LIT
c. Check VCT level: c. Manually increase VCT makeup flow as follows:

o Level - GREATER THAN 20%

1) Ensure BA transfer pumps and

-OR- RMW pumps running. IF NOT, THEN reset MCC C and MCC D UV o Level - STABLE OR INCREASING lockouts as necessary.

2) Place RMW flow control valve HCV-ill in MANUAL.
3) Increase RMW flow.

$ 't tg

EOP: TITLE:

REV: 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 14'f 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 16 Check Charging Pump Suction Aligned To VCT:

a. VCT level - GREATER THAN 20% a. IF VCT level can NOT be maintained greater than 5%, THEN perform the following:
1) Ensure charging pump suction aligned to RWST o LCV-112B open o LCV-112C closed
2) Continue with Step 17. WHEN VCT level greater than 40%,

THEN do Step 16b.

b. Verify charging pumps aligned to b. Manually align valves as VCT necessary.

o LCV-112C - OPEN o LCV-112B - CLOSED

v 4

1' EOP: Z LE:

REV: 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 15 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 17 Check RCP Cooling: Establish normal cooling to RCPs (Refer to Attachment SEAL COOLING).

a. Check CCW to RCPs:

o Annunciator A-7, RCP 1A CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED o Annunciator A-15, RCP 1B CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED

b. Check RCP seal injection:

o Labyrinth seal D/Ps - GREATER THAN 15 INCHES OF WATER

-OR-o RCP seal injection flow to each RCP - GREATER THAN 6 GPM

Xii+

4 V 1Z

EOP: TlTLE:

REV: 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 16 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 18 Check Should IfBe Seal Return Flow Established:

a. Verify RCP ¹1 seal outlet a. Go to Step 19.

temperature - LESS THAN 235'F b." Verify RCP seal outlet valves b. Manually open valves as OPEN necessary.

~ AOV-270A

~ AOV-270B

c. Reset both trains of XY relays for RCP seal return isolation valve MOV-313
d. Open RCP seal return isolation d. Perform the following:

valve MOV-313

1) Place MOV-313 switch to OPEN.
2) Dispatch AO with key to RWST gate to locally open MOV-313.
e. Verify RCP ¹1 seal leakoff flow e. IF any RCP seal leakoff flow LESS THAN 5.5 GPM greater than 5.5 gpm THEN:

o Close the affected RCP seal discharge valve

~ RCP A, AOV-270A

~ RCP B, AOV-270B o Trip the affected RCP IF both RCP seal discharge valves are shut, THEN go to Step 19.

f. Verify RCP ¹1 seal leakoff flow f. Refer to AP-RCP.1, RCP SEAL GREATER THAN 0.25 GPM MALFUNCTION.

~W 44 r.r K

EOP: TITLE:

REV: 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 17 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 19 Equalize Charging And Letdown Flows:

a. Verify charging pump controllers in manual
b. Control charging and seal injection flows to equal letdown and seal leakoff flows 20 Check Should IfBe Emergency D/Gs Stopped:
a. Verify AC emergency busses a. Try to restore offsite power energized by offsite power: (Refer to ER-ELEC.1, RESTORATION OF OFFSITE POWER).

o Emergency D/G output breakers OPEN o AC emergency bus voltage GREATER THAN 420 VOLTS o AC emergency bus normal feed breakers - CLOSED

b. Stop any unloaded emergency D/G and place in standby (Refer to Attachment D/G STOP) 21 Minimize Secondary System Contamination:
a. Isolate reject from hotwell to a. IF hotwell level increasing, CST: THEN direct RP to sample hotwells for activity.

o Place hotwell level controller (HC-107) in MANUAL at 50%

o Verify hotwell level - STABLE

b. Verify local actions to complete isolation of ruptured S/G (Refer to Attachment RUPTURED S/G)

i4 tile t~ f,, 'g: i,f ~ II

~ w t l

J

EOP: TITLE:

REV 11 ECA-3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 18 of 27

-STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Adverse,CNMT conditions or loss of forced air cooling may result in failure of NIS detectors.

22 Check If Source Detectors Should Range Be Energized:

a. Source range channels a. Go to Step 22e.

DEENERGIZED

b. Check intermediate range flux- b. Perform the following:

EITHER CHANNEL LESS THAN 10 10 AMPS 1) IF neither intermediate range channel is decreasing, THEN initiate boration.

2) Continue with Step 23. WHEN flux is LESS THAN 10 amps on any operable channel, THEN do Steps 22c through e.
c. Check the following: c. Continue with Step 23. WHEN either condition met, THEN do o Both intermediate range Steps 22d and e.

channels - LESS THAN 10 10 AMPS

-OR-o Greater than 20 minutes since reactor trip

d. Verify source range detectors d. Manually energize source range ENERGIZED detectors by depressing P-6 permissive defeat pushbuttons (2 of 2).

IF source ranges can NOT be restored, THEN refer to ER-NIS.1, SR MALFUNCTION and go to Step 22.

e. Transfer Rk-45 recorder to one source range and one intermediate range channel

~1/ c

~I Lg

EOP: TITLE:

REV: 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 19 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 23 Establish Normal Shutdown Alignment:

a. Check condenser - AVAILABLE a. Dispatch AO to perform Attachment SD-2.
b. Perform the following:

o Open generator disconnects

~ 1G13A71

~ 9X13A73 o Place voltage regulator to OFF o Open turbine drain valves o Rotate reheater steam supply controller cam to close valves o Place reheater dump valve switches to HAND o Stop all but one condensate pump

c. Verify adequate Rx head cooling:
1) Check IA to CNMT - AVAILABLE 1) Go to Step 24.
2) Verify at least one control 2) Manually start one fan as rod shroud fan - RUNNING power supply permits (45 kw)
3) Verify one Rx compartment 3) Perform the following:

cooling fan - RUNNING o Dispatch AO to reset UV relays at MCC C and MCC D.

o Manually start one fan as

'power supply permits (23 kw)

d. Verify Attachment SD-1 - COMPLETE

I

~,E>

a~

~C

'1

EOP: TLTLF.:

REV: 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 20 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Plant staff should decide whether to repair PRZR pressure control systems or continue with this procedure. If PRZR pressure control is established, PRZR level should be restored to greater than 5% [30%

adverse CNMTj and then further recovery should continue with E-3, STEAM GENERATOR TUBE RUPTURE, Step 37.

24 Check Isolated:

If SI ACCUMs Should Be

a. Check the following: a. Return to Step 11.

o RCS subcooling based on core exit T/Cs - GREATER THAN O' USING FIGURE MIN SUBCOOLING o RVLIS indication - GREATER THAN 68% [73% adverse CNMT]

b. Dispatch AO with locked valve key to locally close breakers for SI ACCUM discharge valves

~ MOV-841, MCC C position 12F

~ MOV-865, MCC D position 12C

c. Close SI ACCUM discharge valves c. Vent any unisolated ACCUMs:

+ MOV-841 1) Open vent valves for

~ MOV-865 unisolated SI ACCUMs.

~ ACCUM A, AOV-834A

~ ACCUM B, AOV-834B

2) Open HCV-945.
d. Locally reopen breakers for MOV-841 and MOV-865

sCk 4

(f, A~

a 1

EOP: TITLE:

REV: 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 21 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Leakage from ruptured S/G into RCS will dilute RCS boron concentration.

25 Verify Adequate Shutdown Margin

a. Direct HP to sample RCS and ruptured S/G for boron concentration
b. Verify boron concentration b. Borate as necessary.

GREATER THAN REQUIREMENTS OF FIGURE SDM 26 Maintain Required RCP Seal Perform the following:

Injection Flow And Labyrinth Seal D/P: o Adjust charging flow to REGEN Hx, HCV-142 as necessary.

o Labyrinth seal D/P to each RCP GREATER THAN 15 INCHES OF WATER -OR-o RCP seal injection flow o Dispatch AO to adjust seal GREATER THAN 6 GPM injection needle valves V-300A and V-300B if necessary.

27 Initiate RCS Cooldown to 350'F In RCS Cold Legs:

a. Establish and maintain cooldown rate in RCS cold legs - LESS THAN 100'F/HR
b. Dump steam to condenser from b. Manually or locally dump steam intact S/G using intact S/G ARV.

IF no intact S/G available, THEN use faulted S/G.

4 J

4h(

Xt n's

EOP: j11'LE:

REV: 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 22 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

              • x*xx x x x x x x x% x x% x CAUTION x*x x**********x***

RCS AND RUPTURED S/G PRESSURES MUST BE MAINTAINED LESS THAN THE RUPTURED S/G ARV SETPOINT.

    • x ************ x x x x ************** x *******

28 Control Charging Flow To Maintain RCS Subcooling:

a. RCS subcooling based on core a. Increase charging flow to exit T/Cs - GREATER THAN 20'F maintain subcooling greater than USING FIGURE MIN SUBCOOLING 20'F using Figure MIN SUBCOOLING and go to Step 29.
b. Ruptured S/G narrow range level b. Control charging flow to LESS THAN 90% [85% adverse maintain RCS pressure at CNMT) ruptured S/G pressure and go to Step 29.
c. Ruptured S/G narrow range level c. IF ruptured S/G level STABLE OR DECREASING increasing, THEN decrease charging flow to stabilize level. Maintain RCS subcooling greater than '20'F using Figure MIN SUBCOOLING.

29 Check Be If RCS Stopped:

Cooldown Should

a. RCS cold leg temperatures - LESS a. Return to Step 25.

THAN 350'F

b. Stop RCS cooldown

Ql7 .rf~" Vf 'P l p/

Is

EOP: TITLE:

REV: 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 23 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 30 Check RCS Pressure GREATER Go to Step 33.

THAN 400 PSIG [300 PSIG adverse CNMT]

  • 31 Monitor Ruptured S/G Narrow Refill ruptured S/G to 67% [55%

Range Level GREATER THAN adverse CNMT) using feed flow.

174 (25'dverse CNMT)

IF either of the following conditions occurs, THEN stop feed flow to ruptured S/G:

o Ruptured S/G pressure decreases in an uncontrolled manner.

-OR-o Ruptured S/G pressure increases to 1020 psig.

EOP: titLE:

REV: 11 ECA-3.3 SGTR WITHOUT- PRESSURIZER PRESSURE CONTROL PAGE 24 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

                • 0' x x  % x x x x @ **0 **x********x CAUTION
    • x*****

~

o STEAM SHOULD NOT BE RELEASED FROM A RUPTURED S/G IF WATER MAY EXIST IN ITS STEAMLINE.

o RUPTURED S/G PRESSURE MAY DECREASE RAPIDLY WHEN STEAM IS RELEASED.

                • 0 x*% x 0*% x x w % x x 0** x****x********

NOTE: The upper head region may void during RCS depressurization if RCPs are not running. This may result in a rapidly increasing PRZR level.

32 Depressurize RCS And Ruptured S/G To 400 PSIG [300 PSIG adverse CNMT]

a. Perform the following:

o Decrease charging and increase letdown to initiate backfill

-OR-o Initiate blowdown from ruptured S/G

-OR-o Dump steam from ruptured S/G

b. Check RCS pressure - LESS THAN b. Return to Step 31.

400 psig [300 psig adverse CNMTI

c. Stop RCS depressurization

1 J

'~y't ~

v LC+

'1

~if

EOP: TITLE:

REV: 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 25 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 33 Check Can Be IfEstablished:

RHR Normal Cooling

a. RCS cold leg temperature - LESS a. Return to Step 27.

THAN 350'F

b. RCS pressure - LESS THAN b. Return to Step 31.

400 psig (300 psig adverse CNMTj

c. Place RCS overpressure c. IF RCS overpressure protection protection system in service system can NOT be placed in (Refer to 0-7, ALIGNMENT AND service, THEN notify TSC of OPERATION OF THE REACTOR VESSEL potential Tech Spec violation if OVERPRESSURE PROTECTION SYSTEM) RHR system is placed in service.
d. Establish RHR normal cooling (Refer to Attachment RHR COOL)

NOTE: Leakage from ruptured S/G into RCS will dilute RCS boron concentration.

34 Verify Adequate Shutdown Margin

a. Direct HP to sample RCS and ruptured S/G for boron concentration
b. Verify boron concentration- b. Borate as necessary.

GREATER THAN REQUIREMENTS OF FIGURE SDM

I Qt

EOP: TITLE:

REV: 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 26 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 35 Initiate RCS Cooldown To Cold Shutdown:

a. Establish and maintain cooldown rate in RCS cold legs - LESS THAN 100'F/HR
b. Use RHR system if in service
c. Dump steam to condenser from c. Manually or locally dump steam intact S/G from intact S/G using ARVs.

IF no intact S/G available and RHR system NOT in service, THEN use faulted S/G.

36 Control Charging Flow To Maintain RCS Subcooling:

a. RCS subcooling based on core a. Increase charging flow to exit T/Cs - GREATER THAN 20'F maintain subcooling greater than USING FIGURE MIN SUBCOOLING 20'F using Figure MIN SUBCOOLING and go to Step 37.
b. Ruptured S/G narrow range level b. Control charging flow to LESS THAN 90% f85% adverse maintain RCS pressure at CNMTJ ruptured S/G pressure and go to Step 37.
c. Ruptured S/G narrow range level c. IF ruptured S/G level STABLE OR DECREASING increasing, THEN decrease charging flow to stabilize level. Maintain RCS subcooling greater than 20'F using Figure MIN SUBCOOLING.

4 C

E (J

-)

P t

EOP: TITLE:

REV 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 27 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

  • 37 Monitor RCP Operation:
a. RCPs - ANY RUNNING a. Go .to Step 39.
b. Check the following: b. Go to Step 39.

o RCP 41 seal D/P - LESS THAN 220 PSID

-OR-o Check RCP seal leakage - LESS THAN 0.25 GPM

c. Stop affected RCP(s) 38 Check Core Exit T/Cs LESS Return to Step 34.

THAN 200'F 39 Evaluate Long Term Plant Status:

a. Maintain cold shutdown conditions
b. Consult TSC

-END-

I( C t

tg ht ls 5 < Jl 0

EOP: TITLE REV: 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 1 of 1 ECA-3.3 APPENDIX LIST TITLE PAGES

1) RED PATH

SUMMARY

2) FIGURE MIN SUBCOOLING
3) FIGURE SDM
4) ATTACHMENT RCP START
5) ATTACHMENT N2 PORVS
6) ATTACHMENT RUPTURED S/G
7) ATTACHMENT D/G STOP
8) ATTACHMENT SD-1
9) ATTACHMENT SEAL COOLING
10) ATTACHMENT SD-2
11) ATTACHMENT RHR COOL
12) ATTACHMENT AUX BLDG SW
13) FOLDOUT

C I

REV 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 1 of 1 RED PATH

SUMMARY

a. SUBCRITICALITY Nuclear power greater than 5%
b. CORE COOLING Core exit T/Cs greater than 1200'F

-OR-Core exit T/Cs greater than 700'F AND RVLIS level (no RCPs) less than 43% [464 adverse CNMT)

c. HEAT SINK Narrow range level in all S/Gs less than 5%

[25% adverse CNMT] AND total feedwater flow less than 200 gpm

d. INTEGRITY Cold leg temperatures decrease greater than 100'F in last 60 minutes AND RCS cold leg temperature less than 285'F
e. CONTAINMENT CNMT pressure greater than 60 psig

a s

>

11 II fd R,

~,

f

<<4 'I

, ~

EOP: TITLE REV 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 1 of 1 FIGURE MIN SUBCOOLING NOTE: Subcooling Margin = Saturation Temperature From Figure Below [-j Core Exit T/C Indication RC S PRESSURE (PS IG) 2500 2400 RCS PRESSURE 2300 INCREMENTS 20 PSIG 2200 2100 2000 1900 1800 1700 1600 1500 1400 SUBCOOLED 1300 REGION 1200 1100 1000 900 800 700 INADEQUATE SUBCOOLING 600 ADVERSE CNMT REGION 500 400 300 200 NORMAL CNMT TEMPERATURE INCREMENTS 10'F 100 0

200 250 300 350 400 450 500 550 600 650 700 CORE EXIT SATURATION TEMPERATURE ('F)

/

k t~

CV lf 1

E g ph ld

EOP: TITLE:

REV: 11 ECA-3 ' SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 1 of 1 FIGURE SDM NOTE: o Curve includes allowance for one stuck rod. Add 100 ppm for each additional stuck rod.

o To obtain core burnup, use PPCS turn on code BURNUP.

BORON CONCENTRATION (PPH) 1800 BORON INCREMENTS 20 PPM 1600 1400 ADEQUATE SDM 1200 100 PPM CONSERVATISM INCLUDED 1000 800 600 400 BORATE 200 BURNUP INCREMENTS 100 HWD/HTU 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 CYCLE 24 BURNUP (HWD/MTU)

wS J

l(g

)

E4

EOP: Tl 'fLE:

REV 11 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 1 of 1 FOLDOUT PAGE SI REINITIATION CRITERIA IF EITHER condition listed below occurs, THEN manually operate SI pumps as necessary and go to ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT SUBCOOLED RECOVERY DESIRED, Step 1:

o RCS subcooling based on core exit TCs LESS THAN O'F USING REQUIREMENTS OF FIGURE MIN SUBCOOLING OR o RVLIS level (no RCPs) LESS THAN 684 [734 adverse CNMT]

2. SECONDARY INTEGRITY CRITERIA IF any S/G pressure is decreasing in an uncontrolled manner or is completely depressurized AND has not been isolated, THEN go to E-2, FAULTED S/G ISOLATION, Step 1, unless faulted S/G needed for RCS cooldown.
3. COLD LEG RECIRCULATION SWITCHOVER CRITERION IF RWST level decreases to less than 28<, THEN go to ES-1.3, TRANSFER TO COLD LEG RECIRCULATION, Step l.
4. AFW SUPPLY SWITCHOVER CRITERION IF CST level decreases to less than 5 feet, THEN switch to alternate AFW water supply (Refer to ER-AFW.l, ALTERNATE WATER SUPPLY TO AFW PUMPS).

~

A,'1 (t

.rfi

,/ V