ML17310B347: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 44: | Line 44: | ||
-4.0 I I I I I 0 10 20 80 40 50 60 70 80 90 100 CORE POWER LEVEL,% OF RATED THERMALPOWER | -4.0 I I I I I 0 10 20 80 40 50 60 70 80 90 100 CORE POWER LEVEL,% OF RATED THERMALPOWER | ||
I PVNGS UNIT 1 CYCLE 5 CORE OPERATING LIMITS,REPORT TABLE 5 REQUIRED MONITORING FREQUENCIES FOR BACKUP BORON DILUTIONDETECTION AS A FUNCTION OF OPERATING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR K g 5 0.95 Number of Operating Charging Pumps OPERATIONAL MODE 12 hours 6 hours 2.5 hours 1.5 hours 4 not on SCS 12 hours 6 hours 3 hours 1.5 hours | I PVNGS UNIT 1 CYCLE 5 CORE OPERATING LIMITS,REPORT TABLE 5 REQUIRED MONITORING FREQUENCIES FOR BACKUP BORON DILUTIONDETECTION AS A FUNCTION OF OPERATING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR K g 5 0.95 Number of Operating Charging Pumps OPERATIONAL MODE 12 hours 6 hours 2.5 hours 1.5 hours 4 not on SCS 12 hours 6 hours 3 hours 1.5 hours 5 not on SCS 8 hours hours 3 hours 1.5 hours 4 8c 5 on SCS 8 hours 2 hours 1 hour 0.5 hours 6(>4000ppm) 24 hours 8 hours 4 hours 2 hours Rev. 1 6 (( 4000 ppm) 24 hours 2 hours 0.5 hours ONA Notes: SCS = Shutdown Cooling System ONA = Operation not allowed Rev. 1 Page 24 of 24 | ||
5 not on SCS 8 hours hours 3 hours 1.5 hours 4 8c 5 on SCS 8 hours 2 hours 1 hour 0.5 hours 6(>4000ppm) 24 hours 8 hours 4 hours 2 hours Rev. 1 6 (( 4000 ppm) 24 hours 2 hours 0.5 hours ONA Notes: SCS = Shutdown Cooling System ONA = Operation not allowed Rev. 1 Page 24 of 24 | |||
ENCLOSURE 2 CORE OPERATING LIMITS REPORT VERDE NUCLEAR GENERATING STATION | ENCLOSURE 2 CORE OPERATING LIMITS REPORT VERDE NUCLEAR GENERATING STATION |
Latest revision as of 04:04, 4 February 2020
ML17310B347 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 06/02/1994 |
From: | ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
To: | |
Shared Package | |
ML17310B345 | List: |
References | |
NUDOCS 9406140205 | |
Download: ML17310B347 (20) | |
Text
ENCLOSURE 1 CORE OPERATING LIMITS REPORT PALO VERDE NUCLEAR GENERATING STATION UNIT 1 CYCLE 5 REVISION 1 9406i40205 900602 PDR ADOCK 05000528 P PDR
'f CORE OPERATING LIMITS REPORT (COLR)
PVNGS Unit 3 Cycle 5, Revision 1 Insertion Instructions
- 1. Remove title page (Page 1) and Pages 3, 10, and 24 from the Unit 1 Cycle 5, Revision 0 COLR.
- 2. Insert enclosed Revision 1 title page (Page 1) and Pages 3, 10, and 24 into the Unit 1 Cycle 5 COLR.
CORE OPERATING LIMITSREPORT PALO VERDE NUCLEAR GENERATING STATION (PVNGS)
UNIT 1 CYCLE 5 Revision I
Revision 1 CORE OPERATING LIMITS REPORT PALO VERDE NUCLEAR GENERATING STATION (PVNGS)
UNIT 1 CYCLE 5 REVISION HISTORY
~Revi i n ~Dte ~Pa 10/26/93 Issue for Vse (24 Total Pages) 05'/i 8/e Y Replaced Pages 1,3,10,24 (24 Total Pages)
Page 3 of24
0.5 ech. Spec. 3.1.1.3 aximum Upper imit (0%, 0.5) (100%, 0.0) 0 (50%, 0.0)
(100%, -0.2)
-0.5 Beginning of Cycle limit g
-1
-1,5 MTC AREA OF ACCEPTABLE OPERATION
-2 0
-2.5 0
g
-8 (0%, -8.1) End of Cycle limit 0
-8.5 (100%, -8.8)
-4.0 I I I I I 0 10 20 80 40 50 60 70 80 90 100 CORE POWER LEVEL,% OF RATED THERMALPOWER
I PVNGS UNIT 1 CYCLE 5 CORE OPERATING LIMITS,REPORT TABLE 5 REQUIRED MONITORING FREQUENCIES FOR BACKUP BORON DILUTIONDETECTION AS A FUNCTION OF OPERATING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR K g 5 0.95 Number of Operating Charging Pumps OPERATIONAL MODE 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 4 not on SCS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 5 not on SCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> hours 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 4 8c 5 on SCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 6(>4000ppm) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Rev. 1 6 (( 4000 ppm) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ONA Notes: SCS = Shutdown Cooling System ONA = Operation not allowed Rev. 1 Page 24 of 24
ENCLOSURE 2 CORE OPERATING LIMITS REPORT VERDE NUCLEAR GENERATING STATION
'ALO UNIT 2 CYCLE 5 REVISION 2
t
)I
CORE OPERATING LIMITS REPORT (COLR)
PVNGS Unit 2 Cycle 5, Revision 2 Insertion Instructions
- 1. Remove title page (Page 1) and Pages 3, 10, and 24 from the Unit 2 Cycle 5, Revision 1 COLR.
- 2. Insert enclosed Revision 2 title page (Page 1) and Pages 3, 10, and 24 into the Unit 2 Cycle 5 COLR.
U Coax or zmxrxC, r,nvrnS azr om PALO VERDE NUCLEAR GENERATING STATION (PVNGS)
UNIT 2 CYCLE 5 Revision 2
Revision 2 CORE OPERATING LIMITSREPORT PALO VERDE NUCLE<AR GENERATING STATION (PVNGS)
UNIT 2 GYCLE 5 .- =
REVISION HISTORY R~vi ioo Date Pres 03/16/93 Issue for Review (24 Total Pages) 03/23/93 Issue for Use (24 Total Pages) 03/10/94 1, 3, and 5. Linear Heat Rate Reduced due to LOCA results.
(24 Total Pages)
<</i~A< Replaced pages 1, 3, 10, 24 (24 Total Pages)
Page 3 of24
j Revision 2
, PVNGS UNIT 2 CYCLE 5 CORE OPERATING LIMITSREPORT TABLE 5 REQUIRED MONITORING FREQUENCIES FOR BACKUP BORON DILUTIONDETECTION AS A FUNCTION OF OPERATING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR K ff5 0.95 Number of Operating Charging Pumps OPERATIONAL MODE 0 1 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 4 not on SCS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 5 not on SCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 4&5onSCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 6 ( > 4000 ppm) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> H,ev. 2 6 (< 4000 ppm) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ONA Notes: SCS = Shutdown Cooling System Rev. 2 ONA = Operation not allowed Page 24 of 24
0.5 ech. Syec.3.1.1.3 aximum Uyyer imit (0%, 0.5) (100%, 0.0) 0 Q
(50%, 0.0)
(1oo%, -o.2)
-0.5 M Beginning of Cycle limit R
D
-1
-1.5 MTC AREA OF ACCEPTABLE OPERATION o
~Q
-2.5 g
-3 (0%, -3.1) End of Cycle limit
-3.5 (100%, -3.8)
-4.0 I I I I I 0 10 20 30 40 50 60 70 80 90 100 COBE POWER LEVEL,% OF BATED THERMALPOWER