ML17310B347: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 44: Line 44:
  -4.0                I        I                            I        I          I 0          10  20      80      40        50      60        70        80        90        100 CORE POWER LEVEL,% OF RATED THERMALPOWER
  -4.0                I        I                            I        I          I 0          10  20      80      40        50      60        70        80        90        100 CORE POWER LEVEL,% OF RATED THERMALPOWER


I PVNGS UNIT 1 CYCLE 5 CORE OPERATING LIMITS,REPORT TABLE 5 REQUIRED MONITORING FREQUENCIES FOR BACKUP BORON DILUTIONDETECTION AS A FUNCTION OF OPERATING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR K g 5 0.95 Number of Operating Charging Pumps OPERATIONAL MODE 12 hours      6 hours    2.5 hours  1.5 hours 4 not on SCS              12 hours      6 hours    3 hours    1.5 hours
I PVNGS UNIT 1 CYCLE 5 CORE OPERATING LIMITS,REPORT TABLE 5 REQUIRED MONITORING FREQUENCIES FOR BACKUP BORON DILUTIONDETECTION AS A FUNCTION OF OPERATING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR K g 5 0.95 Number of Operating Charging Pumps OPERATIONAL MODE 12 hours      6 hours    2.5 hours  1.5 hours 4 not on SCS              12 hours      6 hours    3 hours    1.5 hours 5 not on SCS              8 hours          hours    3 hours    1.5 hours 4 8c 5 on SCS            8 hours        2 hours    1 hour    0.5 hours 6(>4000ppm)              24 hours      8 hours    4 hours    2 hours Rev. 1 6 (( 4000 ppm)            24 hours      2 hours    0.5 hours  ONA Notes:  SCS = Shutdown Cooling System ONA = Operation not allowed                                      Rev. 1 Page 24  of 24
                                      '
5 not on SCS              8 hours          hours    3 hours    1.5 hours 4 8c 5 on SCS            8 hours        2 hours    1 hour    0.5 hours 6(>4000ppm)              24 hours      8 hours    4 hours    2 hours Rev. 1 6 (( 4000 ppm)            24 hours      2 hours    0.5 hours  ONA Notes:  SCS = Shutdown Cooling System ONA = Operation not allowed                                      Rev. 1 Page 24  of 24


ENCLOSURE 2 CORE OPERATING LIMITS REPORT VERDE NUCLEAR GENERATING STATION
ENCLOSURE 2 CORE OPERATING LIMITS REPORT VERDE NUCLEAR GENERATING STATION

Latest revision as of 04:04, 4 February 2020

Rev 1 to COLR PVNGS for Units 1 & 2 Cycle 5.
ML17310B347
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/02/1994
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17310B345 List:
References
NUDOCS 9406140205
Download: ML17310B347 (20)


Text

ENCLOSURE 1 CORE OPERATING LIMITS REPORT PALO VERDE NUCLEAR GENERATING STATION UNIT 1 CYCLE 5 REVISION 1 9406i40205 900602 PDR ADOCK 05000528 P PDR

'f CORE OPERATING LIMITS REPORT (COLR)

PVNGS Unit 3 Cycle 5, Revision 1 Insertion Instructions

1. Remove title page (Page 1) and Pages 3, 10, and 24 from the Unit 1 Cycle 5, Revision 0 COLR.
2. Insert enclosed Revision 1 title page (Page 1) and Pages 3, 10, and 24 into the Unit 1 Cycle 5 COLR.

CORE OPERATING LIMITSREPORT PALO VERDE NUCLEAR GENERATING STATION (PVNGS)

UNIT 1 CYCLE 5 Revision I

Revision 1 CORE OPERATING LIMITS REPORT PALO VERDE NUCLEAR GENERATING STATION (PVNGS)

UNIT 1 CYCLE 5 REVISION HISTORY

~Revi i n ~Dte ~Pa 10/26/93 Issue for Vse (24 Total Pages) 05'/i 8/e Y Replaced Pages 1,3,10,24 (24 Total Pages)

Page 3 of24

0.5 ech. Spec. 3.1.1.3 aximum Upper imit (0%, 0.5) (100%, 0.0) 0 (50%, 0.0)

(100%, -0.2)

-0.5 Beginning of Cycle limit g

-1

-1,5 MTC AREA OF ACCEPTABLE OPERATION

-2 0

-2.5 0

g

-8 (0%, -8.1) End of Cycle limit 0

-8.5 (100%, -8.8)

-4.0 I I I I I 0 10 20 80 40 50 60 70 80 90 100 CORE POWER LEVEL,% OF RATED THERMALPOWER

I PVNGS UNIT 1 CYCLE 5 CORE OPERATING LIMITS,REPORT TABLE 5 REQUIRED MONITORING FREQUENCIES FOR BACKUP BORON DILUTIONDETECTION AS A FUNCTION OF OPERATING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR K g 5 0.95 Number of Operating Charging Pumps OPERATIONAL MODE 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 4 not on SCS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 5 not on SCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> hours 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 4 8c 5 on SCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 6(>4000ppm) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Rev. 1 6 (( 4000 ppm) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ONA Notes: SCS = Shutdown Cooling System ONA = Operation not allowed Rev. 1 Page 24 of 24

ENCLOSURE 2 CORE OPERATING LIMITS REPORT VERDE NUCLEAR GENERATING STATION

'ALO UNIT 2 CYCLE 5 REVISION 2

t

)I

CORE OPERATING LIMITS REPORT (COLR)

PVNGS Unit 2 Cycle 5, Revision 2 Insertion Instructions

1. Remove title page (Page 1) and Pages 3, 10, and 24 from the Unit 2 Cycle 5, Revision 1 COLR.
2. Insert enclosed Revision 2 title page (Page 1) and Pages 3, 10, and 24 into the Unit 2 Cycle 5 COLR.

U Coax or zmxrxC, r,nvrnS azr om PALO VERDE NUCLEAR GENERATING STATION (PVNGS)

UNIT 2 CYCLE 5 Revision 2

Revision 2 CORE OPERATING LIMITSREPORT PALO VERDE NUCLE<AR GENERATING STATION (PVNGS)

UNIT 2 GYCLE 5 .- =

REVISION HISTORY R~vi ioo Date Pres 03/16/93 Issue for Review (24 Total Pages) 03/23/93 Issue for Use (24 Total Pages) 03/10/94 1, 3, and 5. Linear Heat Rate Reduced due to LOCA results.

(24 Total Pages)

<</i~A< Replaced pages 1, 3, 10, 24 (24 Total Pages)

Page 3 of24

j Revision 2

, PVNGS UNIT 2 CYCLE 5 CORE OPERATING LIMITSREPORT TABLE 5 REQUIRED MONITORING FREQUENCIES FOR BACKUP BORON DILUTIONDETECTION AS A FUNCTION OF OPERATING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR K ff5 0.95 Number of Operating Charging Pumps OPERATIONAL MODE 0 1 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 4 not on SCS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 5 not on SCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 4&5onSCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 6 ( > 4000 ppm) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> H,ev. 2 6 (< 4000 ppm) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ONA Notes: SCS = Shutdown Cooling System Rev. 2 ONA = Operation not allowed Page 24 of 24

0.5 ech. Syec.3.1.1.3 aximum Uyyer imit (0%, 0.5) (100%, 0.0) 0 Q

(50%, 0.0)

(1oo%, -o.2)

-0.5 M Beginning of Cycle limit R

D

-1

-1.5 MTC AREA OF ACCEPTABLE OPERATION o

~Q

-2.5 g

-3 (0%, -3.1) End of Cycle limit

-3.5 (100%, -3.8)

-4.0 I I I I I 0 10 20 30 40 50 60 70 80 90 100 COBE POWER LEVEL,% OF BATED THERMALPOWER