ML17311A545

From kanterella
Jump to navigation Jump to search
Revised Pages to Rev 3 of PVNGS Unit 3 Cycle 5 Colr
ML17311A545
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/09/1994
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17311A539 List:
References
NUDOCS 9412300009
Download: ML17311A545 (5)


Text

CORE OPERATING LIMITSREPORT PALO VERDE NUCLEARGENERATING STATION (PVNGS)

UNIT3 CYCLE 5 Revision 3 94i2300009 94122i PDR ADDCK 05000528 P

PDR

Revision 3

PVNGS UNIT3 CYCLE 5 CORE OPERATING LIMITSREPORT CORE OPERATING LIMITSREPORT PALO VERDE NUCLEAR GENERATING STATION (PVNGS)

UNIT3 CYCLE 5 REVISION HISTORY

~Rvi~in Date 04/20/94 05/20/94 P~ae First issue U3C5 (24 Total Pages)

Replaced pages 1,3, 17 (24 Total Pages) 07/06/94 Replaced pages 1, 3 16, 17, 18 (24 Total Pages) 11/09/94 Replace pages 1,3,7 (24 Total Pages)

Page 3 of 24

Jp

Revision 3

PVNGS UNIT3 CYCLE 5 CORE OPERATING LIMITSREPORT

~EFIMKN See Technical Specification Section 6.9.1.10 for References Page 7 of 24

1 0

J

~

% u