ML17310B160
| ML17310B160 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/25/1994 |
| From: | ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | |
| Shared Package | |
| ML17310B159 | List: |
| References | |
| NUDOCS 9404050258 | |
| Download: ML17310B160 (10) | |
Text
ENCLOSURE PALO VERDE NUCLEAR GENERATING STATION
,REVISION 1 TO UNIT 2, CYCLE 5, CORE OPERATING LIMITS REPORT
'P404050058'40325, POR ADOCK 05000529,'
P
'D.R
t t
H 1
l
CORE OPERATING LIMITS REPORT (COLR)
PVNGS Unit 2 Cycle 5, Revision 1
Insertion Instructions 1.
Remove title page (page
- 1) and pages 3 and 5 from the Unit 2 Cycle 5, Revision 0, COLR.
2.
Insert enclosed Revision 1 title page (page
- 1) and pages 3 and 5 into the Unit 2 Cycle 5 COLR.
I 4
II
Revision 1
CORE OPERATING LIMITSREPORT PALO VERDE NUCLEARGENERATING STATION (PVNGS)
UNIT2 CYCLE 5 REVISION HISTORY Revision Date
~Pa~e A
03/16/93 03/23/93 Issue for Review (24 Total Pages)
Issue for Use (24 Total Pages) 03/10/94 1, 3, and 5. Linear Heat Rate Reduced due to LOCA results.
(24 Total Pages)
Page 3 of 24
~ t
\\
Revision 1
PVNGS UNIT2 CYCLE 5 CORE OPERATING LIMITSREPORT ORE PERATING LIMIT, -
NTIN ED 3.1.2.7 - Boron Diluti n Alarm With one or both start-up channel high neutron fluxalarms inoperable, the RCS boron concentration shall be determined at the applicable monitoring frequency specified in Tables 1 through 5.
8.1.8.1 - Movable ontr 1
em lie EA P
. ition With one or more full-length or part-length CEAs misaligned from any other CEAs in its group by more than 6.6 inches, the minimum required MODES 1 and 2 core power reduction is specified in Figure 3.
.1.8 6-Re latin EAIn erti n Limit One or more CEAC's OPERABLE: The regulation CEA groups shall be limited to the withdrawal sequence and to the insertion limits shown on Figure 4 when the COLSS is IN SERVICE or shown on Figure 5 when the COLSS is QUT OF SERVICE.
3.1.3.7 - P t Len h
EA In ertion Limit One or more CEAC's OPERABLE: The part length CEA groups shall be limited to the insertion limits shown on Figure 6.
8.2.1 - Linear He t Rate The linear heat rate limitof 13.2 kw/ftshall be maintained.
8.2.3 - Azimuthal Power Tilt-T The AZIMU'IHALPOWER TILT(Tq) shall be less than or equal to the limitin Figure 7 with COLSS INSERVICE.
Page 5 of 24
~
~
V II l'1 f
CORE OPERATING LIMITSREPORT PALO VERDE NUCLEARGENERATING STATION (PVNGS)
UNIT2 CYCLE 5 Revision 1
I