Revision 3 Pages Unit 3 COLR 97080M257'70730 0 PDR ADGCK 05000528 P
CORE OPERATING LIMITSREPORT PALO VERDE NUCLEARGENERATING STATION (PVNGS)
Unit 3 Revision 3 Page 1 of 24
t Revision 3
PVNGS VNIT3 CORE OPERATING LIMITSREPORT Table of Contents
~Desert tion Revision 0
~Pa e
Cover Page
~
Table of Contents Affected Technical Specifications CORE Operating Limits 3.1.1.1 Shutdown Margin - Reactor Trip Breakers Open 3.1.1.2 Shutdown Margin - Reactor Trip Breakers Closed 3.1.1.3 Moderator Temperature Coefficient 3.1.2.7 Boron Dilution Alarms 3.1.3.1 Movable Control Assemblies - CEA Position 3.1.3.6 Regulating CEA Insertion Limits 3.1.3.7 Part Length CEA Insertion Limits 3.2.1 Linear Heat Rate 3.2.3 Azimuthal Power Tilt-Tq 3.2.4 DNBR Margin 3.2.7 Axial Shape Index 3.9.1 Boron Concentration (Mode 6)
List of Figures Figure 3.1.1.1-1 Shutdown Margin Versus Cold Leg Temperature Reactor Trip Breakers Open Figure 3.1.1.2-1 Shutdown Margin Versus Cold Leg Temperature Reactor Trip Breakers Closed Figure 3.1.1.3-1 MTC Acceptable Operation, Modes 1 and 2 Figure 3.1.3.1-1 Core Power LimitAfter CEA Deviation 10 Figure 3.1.3.6-1 CEA Insertion Limits Versus Thermal Power (COLSS in Service) 12 Figure 3.1.3.6-2 CEA Insertion Limits Versus Thermal Power (COLSS Out of Service) 13 Figure 3.1.3.7-1 Part Length CEA Insertion Limits Versus Thermal Power 1
Page 2 of 24
t Revision 3
PVNGS UNIT3 CORE OPERATING LIMITSREPORT Table of Contents (Continued)
D~eecri rien Rev>sion ¹
~Pa e
Figure 3.2.3-1 Azimuthal Power TiltVersus Thermal Power (COLSS in Service) 15 Figure 3.2.4-1 COLSS DNBR Operating LimitAllowance for Both CEACs Inoperable Figure 3.2.4-2 DNBR Margin Operating LimitBased on the Core Protection Calculators (COLSS Out of Service, CEACs Operable) 16 17 Figure 3.2.4-3 DNBR Margin Operating LimitBased on the Core Protection Calculators (COLSS Out of Service, CEACs Inoperable) 18 List ofTables 19 Table 3.1.2.7-1 Required Monitoring Frequencies for Backup Boron Dilution Detection as a Function of Operating Charging Pumps and Plant Operational Modes for Keff> 0.98 20'able 3.1.2.7-2 Required Monitoring Frequencies for Backup Boron Dilution Detection as a Function of Operating Charging Pumps and Plant Operational Modes for 0.98 > Keff'> 0.97
~ 21 Table 3.1.2.7-3 Required Monitoring Frequencies for Backup Boron DilutionDetection as a Function of Operating Charging Pumps and Plant Operational Modes for 0.97 > Keff> 0.96
- 22 Table 3.1.2.7-4 Required Monitoring Frequencies for Backup Boron Dilution Detection as a Function of Operating Charging Pumps and Plant Operational Modes for 0.96 > Keff> 0.95 23 Table 3.1.2.7-5 Required Monitoring Frequencies for Backup Boron Dilution Detection as a Function of Operating Charging Pumps and Plant Operational Modes for Keff(0.95 Page 3 of 24
l Revision 3
PVNGS UNIT3 CORE OPERATING LIMITSREPORT RE PFRATIN LIMIT -
NTIN ED 8.1.1.3 - Moderator Tem erature Coefficient The moderator temperature coefficient (MTC) shall be within the area ofAcceptable Operation shown in Figure 8.1.1.8-1.
3.1.2.7 - Boron DilutionAlarms With one or both start-up channel high neutron flux alarms inoperable, the RCS boron concentration shall be determined at the applicable monitoring frequency specified in Tables 8.1.2.7-1 through 3.1.2.7-5.
3.1.3.1 - Movable Control Assemblies - CEA Position With one or more full-length or part-length CEAs misaligned from any other CEAs in its group by more than 6.6 inches, the minimum required MODES 1 and 2 core power reduction is specified in Figure 8.1.8.1-1.
3.1.3.6 - Re latin CEA Insertion Limits One or more CEACs OPERABLE: With COLSS IN SERVICE, regulation CEA groups shall be limited to the withdrawal sequence and to the insertion limits shown in Figure 8.1.3.6-1; with COLSS OUT OF SERVICE, regulation CEA groups shall be limited to the withdrawal sequence and to the insertion limits shown in Figure 8.1.3.6-2.
3.1.3.7 - Part Len h CEA Insertion Limits One or more CEACs OPERABLE: The part length CEA groups shall be limited to the insertion limits shown in Figure 8.1.3.7-1.
3.2.1 - Linear Heat Rate The linear heat rate limitof 12.9 kW/ftshall be maintained.