ENCLOSURE 1 CORE OPERATING LIMITS REPORT PALO VERDE NUCLEAR GENERATING STATION UNIT 1 CYCLE 5 REVISION 1 9406i40205 900602 PDR ADOCK 05000528 P
'f
CORE OPERATING LIMITS REPORT (COLR)
PVNGS Unit 3 Cycle 5, Revision 1
Insertion Instructions 1.
Remove title page (Page
- 1) and Pages 3, 10, and 24 from the Unit 1 Cycle 5, Revision 0 COLR.
2.
Insert enclosed Revision 1 title page (Page
- 1) and Pages 3, 10, and 24 into the Unit 1 Cycle 5 COLR.
CORE OPERATING LIMITSREPORT PALO VERDE NUCLEARGENERATING STATION (PVNGS)
UNIT 1 CYCLE 5 Revision I
Revision 1
CORE OPERATING LIMITSREPORT PALO VERDE NUCLEAR GENERATING STATION (PVNGS)
UNIT1 CYCLE 5 REVISION HISTORY
~Revi i n
~Dte 10/26/93 05'/i8/e Y
~Pa Issue for Vse (24 Total Pages)
Replaced Pages 1,3,10,24 (24 Total Pages)
Page 3 of24
0.5 0
(0%, 0.5) ech. Spec. 3.1.1.3 aximum Upper imit (100%, 0.0)
(50%, 0.0)
(100%, -0.2)
-0.5
-1
-1,5
-2
-2.5
-8
-8.5 (0%, -8.1)
MTC AREA OF ACCEPTABLE OPERATION Beginning of Cycle limit End of Cycle limit (100%, -8.8) g 0
0 g0
-4.0 0
10 I
I I
I I
20 80 40 50 60 70 80 CORE POWER LEVEL,% OF RATED THERMALPOWER 90 100
I
PVNGS UNIT1 CYCLE 5 CORE OPERATING LIMITS,REPORT TABLE5 REQUIRED MONITORINGFREQUENCIES FOR BACKUPBORON DILUTIONDETECTIONAS AFUNCTION OF OPERATING CHARGINGPUMPS ANDPLANTOPERATIONALMODES FOR K g 5 0.95 OPERATIONAL MODE Number ofOperating Charging Pumps 4 not on SCS 5 not on SCS 4 8c 5 on SCS 6(>4000ppm) 6 (( 4000 ppm) 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 24 hours 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 8 hours 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 2 hours 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 6 hours 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 6 hours 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> hours 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 3 hours 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 3 hours 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1 hour 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 4 hours 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ONA Rev. 1 Notes:
SCS = Shutdown Cooling System ONA= Operation not allowed Rev. 1 Page 24 of 24
ENCLOSURE 2 CORE OPERATING LIMITS REPORT
'ALO VERDE NUCLEARGENERATING STATION UNIT 2 CYCLE 5 REVISION 2
t
)I
CORE OPERATING LIMITS REPORT (COLR)
PVNGS Unit 2 Cycle 5, Revision 2 Insertion Instructions 1.
Remove title page (Page
- 1) and Pages 3, 10, and 24 from the Unit 2 Cycle 5, Revision 1 COLR.
2.
Insert enclosed Revision 2 title page (Page
- 1) and Pages 3, 10, and 24 into the Unit 2 Cycle 5 COLR.
U
Coax or zmxrxC, r,nvrnS azr om PALO VERDE NUCLEARGENERATING STATION (PVNGS)
UNIT2 CYCLE 5 Revision 2
Revision 2 CORE OPERATING LIMITSREPORT PALO VERDE NUCLE<AR GENERATING STATION (PVNGS)
UNIT2 GYCLE 5.-
=
REVISION HISTORY R~vi ioo Date 03/16/93 03/23/93 03/10/94
<</i~A<
Pres Issue for Review (24 Total Pages)
Issue for Use (24 Total Pages) 1, 3, and 5. Linear Heat Rate Reduced due to LOCA results.
(24 Total Pages)
Replaced pages 1, 3, 10, 24 (24 Total Pages)
Page 3 of24
j
Revision 2
, PVNGS UNIT2 CYCLE 5 CORE OPERATING LIMITSREPORT TABLE5 REQUIRED MONITORINGFREQUENCIES FOR BACKUPBORON DILUTIONDETECTION AS AFUNCTION OF OPERATING CHARGINGPUMPS ANDPLANTOPERATIONALMODES FOR K ff5 0.95 OPERATIONAL MODE Number ofOperating Charging Pumps 0
1 4 not on SCS 5 not on SCS 4&5onSCS 6 ( > 4000 ppm) 6 (< 4000 ppm) 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 8 hours 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 6 hours 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 8 hours 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 2 hours 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 6 hours 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 6 hours 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 3 hours 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 3 hours 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1 hour 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 4 hours 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ONA H,ev. 2 Notes:
SCS = Shutdown Cooling System ONA = Operation not allowed Rev. 2 Page 24 of24
0.5 (0%, 0.5) ech. Syec.3.1.1.3 aximum Uyyer imit (100%, 0.0) 0
-0.5
-1
-1.5
-2.5
-3
-3.5 (0%, -3.1)
MTC AREA OF ACCEPTABLE OPERATION (50%, 0.0)
(1oo%, -o.2)
Beginning of Cycle limit End of Cycle limit (100%, -3.8)
Q M
R D
o
~Q g
-4.0 0
10 I
I I
I I
20 30 40 50 60 70 80 COBE POWER LEVEL,%OF BATEDTHERMALPOWER 90 100