{{#Wiki_filter:P RIORITY 1 ACCELERATED RIDS PROCESSING)
{{#Wiki_filter:RIORITY PACCELERATED                  1 RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9409020190 DOC.DATE: 94/08/24 NOTARIZED:
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO DOCKET FACIL:50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C.Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH.NAME AUTHOR AFFILIATION P FITZPATRICK,E.E Indiana Michigan Power Co.(formerly Indiana&Michigan Ele RECIP.NAME RECIPIENT AFFILIATION RUSSELL,W.T.
ACCESSION NBR:9409020190                 DOC.DATE:   94/08/24   NOTARIZED: NO       DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME             AUTHOR AFFILIATION                                                   P FITZPATRICK,E.E Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME             RECIPIENT AFFILIATION RUSSELL,W.T.             Document Control Branch (Document Control Desk)                   R
Document Control Branch (Document Control Desk)R  


==SUBJECT:==
==SUBJECT:==
Informs of revision to 900221 ltr in response to RAI re post-fire safe shutdown methodology at util.Installing reflash capability in control rooms is cancelled.
Informs of revision to 900221 ltr in response to RAI re post-fire safe shutdown methodology at util. Installing reflash capability in control rooms is cancelled.
DISTRIBUTION CODE: A006D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR/Licensing Submittal:
DISTRIBUTION CODE: A006D             COPIES RECEIVED:LTR         ENCL     SIZE:
Fire Protection
TITLE: OR/Licensing Submittal:               Fire Protection     App R GL-88-12 NOTES:
-App R-GL-88-12 NOTES: RECIPIENT ID CODE/NAME PD3-1 LA HICKMAN,J INTERNAL: NRR/DSSA/SPLB OC/LEDC R~FTL 01 EXTERNAL: NOAC COPIES LTTR ENCL 1 0 2 2 1 1 1 0 1 1 1 1 RECIPIENT ID CODE/NAME PD3-1 PD NUDOCS-ABSTRACT OGC/HDS2 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 0 1 1 D 0 C U E NOTE TO ALL"RIDS RECIPIENTS:
RECIPIENT                COPIES            RECIPIENT         COPIES ID  CODE/NAME              LTTR ENCL        ID CODE/NAME     LTTR ENCL PD3-1 LA                       1    0      PD3-1 PD              1    1 HICKMAN,J                       2    2 INTERNAL: NRR/DSSA/SPLB                     1    1      NUDOCS-ABSTRACT      1    1 OC/LEDC                         1    0      OGC/HDS2              1    0 R~FTL             01          1    1 EXTERNAL: NOAC                             1     1     NRC PDR               1   1 D
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.504-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS I'OR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL" 8  
0 C
'1 I Indiana Michigan Power Company P.O.Box 16631 Columbus, OH 43216 AEP:NRC:0692CU Donald C.Cook Nuclear Plant Units 1 and 2 Docket Nos.50-315 and 50-316 License Nos.DPR-58 and DPR-74 REVISION OF PLANS TO INSTALL REFLASH CAPABILITY FOR THE CONTROL ROOM FIRE ANNUNCIATOR PANELS U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Attn: W.T.Russell August 24, 1994
U E
NOTE TO ALL"RIDS RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS I'OR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                   11   ENCL     8


==Dear Mr.Russell:==
  '1 I
The purpose of this letter is to revise previous information submitted February 21, 1990, (AEP:NRC:0692BT), in response to a September 14, 1989, NRC Request for Additional Information (RAI), regarding post-fire safe shutdown methodology at Donald C.Cook Nuclear Plant.On page 13, of Attachment 1, of AEP:NRC:0692BT, we committed to install"detection system reflash capability in the control rooms", and indicated that this"modification is being developed with a target completion by December 1991." The commitment was not required by the RAI but, at that time, was believed to be a desirable enhancement.
 
On December 2, 1991, we submitted AEP:NRC:0692BY, and noted therein that the fire alarm reflash project had to be rescheduled for completion by December 31, 1994, due to the complexity of the project.After extensive review, we have concluded that the cost of installing reflash capability will not have a commensurate safety.benefit,-and may not be technically desirable.
Indiana Michigan Power Company P.O. Box 16631 Columbus, OH 43216 AEP:NRC:0692CU Donald C. Cook Nuclear Plant Units          1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 REVISION OF PLANS TO INSTALL REFLASH CAPABILITY FOR THE CONTROL ROOM FIRE ANNUNCIATOR PANELS U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Attn:      W. T. Russell August 24, 1994
This conclusion was based on operator interviews, fire alarm system walkdowns, review of the Fire Probabilistic Risk Assessment (PRA), review of the Detailed Control Room Design Review (DCRDR), engineering evaluations of the fire annunciator panels, and a review of fire detection corrective and preventive maintenance procedures.
 
Attachment 1 to this letter provides detailed justification to support cancelling the reflash modification.
==Dear Mr. Russell:==
QOUAg 9409020190
 
'F40824 PDR ADOCK 05000315.F., PDR Mr.W.T.Russell-2-AEP:NRC:0692CU In addition, this is a Cost Beneficial Licensing Action (CBLA).The lifetime cost savings associated with this CBLA are approximately
The purpose        of this letter is to revise previous information submitted February 21, 1990, (AEP:NRC:0692BT), in response to a September 14, 1989, NRC Request for Additional Information (RAI),
$2,421,000, as detailed in Attachment 2.Sincerely, E.E.Fitzpatrick Vice President cad Attachments cc: A.A.Blind G.Charnoff J.B.Martin NFEM Section Chief NRC Resident Inspector-Bridgman J.R.Padgett ATTACHMENT 1 TO AEP:NRC:0692CU REVISION OF PLANS TO INSTALL REFLASH CAPABILITY FOR THE CONTROL ROOM FIRE ANNUNCIATOR PANELS Attachment 1 to AEP:NRC:0692CU Page 1 During a November 1989 meeting with NRR and Region III staff at Cook Nuclear Plant, the maintenance and surveillance of our Technical Specification (T/S)3/4.7.10,"Fire Related Assemblies," was discussed.
regarding post-fire safe shutdown methodology at Donald C. Cook Nuclear Plant. On page 13, of Attachment 1, of AEP:NRC:0692BT, we committed to install "detection system reflash capability in the control rooms", and indicated that this "modification is being developed with a target completion by December 1991."                  The commitment was not required by the RAI but, at that time, was believed to be a desirable enhancement.
A miscellaneous issue was discussed regardjng fire alarm system circuit supervision.
On    December    2,  1991,   we submitted AEP:NRC:0692BY, and noted therein that the        fire alarm reflash project had to be rescheduled for completion by December 31, 1994, due to the complexity of the project. After extensive review, we have concluded that the cost of installing reflash capability will not have a commensurate safety. benefit, -and may not be technically desirable.               This conclusion was based on operator interviews, fire alarm system walkdowns, review of the Fire Probabilistic Risk Assessment (PRA),
During this discussi'on, NRC staff inquired if the alarm system had a"reflash" capability.
review of the Detailed Control Room Design Review (DCRDR),
In response to the NRC inquiry, we indicated that reflash capability would be installed.
engineering evaluations of the fire annunciator panels, and a review of fire detection corrective and preventive maintenance procedures.          Attachment 1 to this letter provides detailed justification to support cancelling the reflash modification.
On February 21, 1990, we submitted AEP:NRC:0692BT, in response to NRC Request for Additional Information regarding post-fire safe shutdown methodology.
QOUA g 9409020190 'F40824 PDR  ADOCK 05000315
On page 13 of Attachment 1, we committed to install"detection system reflash capability in the control rooms" and indicated that this"modification is being developed with a target completion by December 1991." On December.2, 1991, we submitted AEP:NRC:0692BY and noted therein that the fire alarm reflash project would be rescheduled for completion by December 31, 1994, due to the complexity of the project.In accordance with our commitment to install reflash on the control room fire panels, a plant modification (12-PM-1015) was opened.This plant modification was subsequently closed when it was realized that the scope of work was significantly more resource intensive than initially envisioned and would require a corporate (AEPSC)design change.Subsequent reviews and evaluations have now determined that reflash cannot be installed for the fire panels for less than a minimum cost of approximately
.F.,                    PDR
$2,421,000 (1993 dollars, for both units excluding the simulator).
 
The fire annunciator panels in the Cook Nuclear Plant control rooms have a simple operating sequence consistent with the rest of the control room annunciator panels.When the input to an annunciator drop changes from normal to abnormal, the drop will begin to flash and sound an audible alarm.The operator acknowledges the alarm by pushing the associated drop (which is also a push button switch)which silences the audible alarm and results in a standing (solid)visual alarm.When the condition clears, the light will flash again, along with an audible signal, until the drop is'epressed.
Mr. W. T. Russell                              AEP:NRC:0692CU In addition, this is    a Cost  Beneficial Licensing Action (CBLA).
The Cook Nuclear Plant control room annunciator system was designed to provide plant monitoring functions and to address human factors concerns.This was achieved, in part, by the utilization of shared alarm point inputs (multi-input drops).This enables each drop to accept multiple process signals to provide necessary information without distracting operators with Attachment 1 to AEP:NRC:0692CU Page 2 redundant or"low-level" information.
The  lifetime cost savings      associated with this CBLA are approximately  $ 2,421,000, as  detailed in Attachment 2.
In general, multiple alarm point inputs are logically grouped by system function and/or physical location (e.g., fire protection alarms for all four reactor coolant pumps are grouped together onto one annunciator drop).When the first abnormal condition occurs, the alarm point can return to normal only after all associated input conditions have returned to normal.Subsequent abnormal conditions would not"reflash" that alarm point while a previous abnormal condition still exists.Cook Nuclear Plant utilizes multi-input:
Sincerely, E. E. Fitzpatrick Vice President cad Attachments cc:  A. A. Blind G. Charnoff J. B. Martin NFEM Section  Chief NRC Resident  Inspector  - Bridgman J. R. Padgett
drops in accordance with NUREG-0700 and the AEP system control room design philosophy.
 
Multi-input:
ATTACHMENT 1 TO AEP:NRC:0692CU REVISION OF PLANS TO INSTALL REFLASH CAPABILITY FOR THE CONTROL ROOM FIRE ANNUNCIATOR PANELS to AEP:NRC:0692CU                              Page 1 During a November 1989 meeting with NRR and Region      III  staff at Cook Nuclear Plant, the maintenance and surveillance of our Technical Specification (T/S) 3/4.7.10, "Fire Related Assemblies,"
alarms without reflash are used if the quantity, sequence or combination of alarm inputs does not change the priority of the alarm, the identity of the alarm condition is available at a local panel or on a hard copy printout (or status light), and it does not significantly affect the nature of or the time required to implement the initial corrective action in response to the alarm condition.
was discussed. A miscellaneous issue was discussed regardjng fire alarm system circuit supervision.      During this discussi'on, NRC if staff inquired the alarm system had a "reflash" capability. In response to the NRC inquiry, we indicated that reflash capability would be installed.
Unit control room fire annunciator panels consist of 150 drops.Drop¹41, labeled FIRE, is a red drop (first priority alarm)and was designed to clearly indicate actuation of fire protection systems.This drop is only energized in conjunction with another drop which identifies the actuating equipment or to signal that the other control room has received their drop¹41 alarm.Other fire panel drops are either red (first priority alarm)indicating system actuation, amber (second priority)for abnormal conditions, or white (third priority)which also indicate syst: em trouble.The annunciator response procedures indicate the areas and/or equipment associated with each drop.For multi-input drops which monitor a large number of zones, the procedures require that, if the annunciator or fire detection zone light remains illuminated, then the operator must monitor the status lights at the top of the fire protection panel once per hour (administratively, once per 30 minutes)for other alarms.The status lights tell the operator which fire protection zone has the abnormal condition.
On  February 21, 1990,  we submitted AEP:NRC:0692BT, in response to NRC  Request for Additional Information regarding post-fire safe shutdown methodology. On page 13 of Attachment 1, we committed to install "detection system reflash capability in the control rooms" and indicated that this "modification is being developed with a target completion by December 1991." On December .2, 1991, we submitted AEP:NRC:0692BY and noted therein that the fire alarm reflash project would be rescheduled for completion by December 31, 1994, due to the complexity of the project.
The requirement to monitor-the fire panel is reiterated in the"Standing Fire Detection Alarm" data sheet which is used to document and track standing alarms on a 30 minute frequency.
In accordance with our commitment to install reflash on the control room fire panels, a plant modification (12-PM-1015) was opened. This plant modification was subsequently closed when it was realized that the scope of work was significantly more resource intensive than initially envisioned and would require a corporate (AEPSC) design change.           Subsequent  reviews and evaluations have now determined that reflash cannot be installed for the fire panels for less than a minimum cost of approximately
In addition, standing alarms associated with Technical Specification required detectors located outside of containment require hourly fire watch patrols to inspect the affected zone(s).Detectors located inside containment have different parameter Attachment 1 to AEP:NRC:0692CU Page 3 monitoring requirements such as monitoring containment air temperatures.
$ 2,421,000 (1993 dollars, for both units excluding the simulator).
Also, certain drops, such as drop¹94"REACTOR COOLANT PUMP FIRE OR ABN," simultaneously annunciate abnormal conditions on their'ssociated system panel.For example, a fire condition illuminating drop¹94 will have an associated alarm on the reactor coolant pump (RCP)panel (located in the control room)indicating the specific affected RCP.The control room operators are trained not to tolerate standing alarms and faulted detector circuits are promptly repaired and well maintained under a comprehensive surveillance and maintenance schedule in accordance with Technical Specifications.
The  fire  annunciator panels in the Cook Nuclear Plant control rooms have a simple operating sequence consistent with the rest of the control room annunciator panels.         When the input to an annunciator drop changes from normal to abnormal, the drop will begin to flash and sound an audible alarm.            The operator acknowledges the alarm by pushing the associated drop (which is also a push button switch) which silences the audible alarm and results in a standing (solid) visual alarm. When the condition clears, the light will flash again, along with an audible signal, until the drop is'epressed.
Standing abnormal alarms are tracked on a daily basis by management and action is taken to keep the number of standing alarms to a minimum.Plant procedures and Technical Specifications require that fire watches be established for inoperable equipment and systems that could affect the safety of the plant.The utilization of local fire indicating/control panels by fire watch personnel provides added assurance that those areas which are monitored by multi-input drops in the control room are being adequately surveyed to preclude potential masking of abnormal fire protection conditions.
The  Cook  Nuclear Plant control room annunciator system was designed   to provide plant monitoring functions and to address human factors concerns.       This was achieved, in part, by the utilization of shared alarm point inputs (multi-input drops).
The Detailed Control Room Design Review (DCRDR)examined all multi-input drops and the annunciator response procedures to determine if reflash and/or printout capability would be needed or advantageous.
This enables each drop to accept multiple process signals to provide necessary information without distracting operators with to AEP:NRC:0692CU                             Page 2 redundant or "low-level" information. In general, multiple alarm point inputs are logically grouped by system function and/or physical location (e.g., fire protection alarms for all four reactor coolant pumps are grouped together onto one annunciator drop). When the first abnormal condition occurs, the alarm point can return to normal only after all associated input conditions have returned to normal. Subsequent abnormal conditions would not "reflash" that alarm point while a previous abnormal condition still exists.
The conclusion of the DCRDR was that no reflash of multi-input alarms was required and that the benefits of reflash would not be cost justified.
Cook Nuclear   Plant utilizes multi-input: drops in accordance with NUREG-0700 and the AEP system   control room design philosophy.
Irrespective of this conclusion, an effort was made during the DCRDR to address the need to add alarms to the Plant Process Computer (PPC)in lieu of splitting multi-input alarms or installing reflash circuits and, it was concluded that adding alarms to the PPC would not, in general, be of value based on operations procedures and the overall control room annunciator design.In conclusion, the integrated use of the control room fire panel along with the associated status.lights, the local fire annunciator panels, the annunciator response procedures, and other control room annunciator panels, provides the necessary information to identity different alarm signals associated with multi-input drops.In addition, the comprehensive surveillance Attachment 1 to AEP:NRC:0692CU Page 4 and maintenance of detector circuits and the low probability of automatic detection system failure, further supports the conclusion that reflash capability will not have a significant plant safety benefit.I Based upon these reviews, the installation of ref lash capability for the control room fire annunciator panels clearly will not provide a significant reduction in plant risk.In addition, installation of reflash capability is not required for compliance with 10 CFR Part 50 Appendix R, for licensing commitments pursuant to NFPA compliance, or for compliance with the guidance provided in Appendix A to BTP APCSB 9.5-1 and our response to the BTP dated January 31, 1977.To support'he above evaluations, we have also reviewed the results of the Individual Plant Examination of External Events (IPEEE)Fire Analysis completed in April 1992.Based on the results of this evaluation, it is concluded that reflash capability will not impact the results of the fire Probabilistic Risk Assessment (PRA).Installation of reflash capability will not reduce the fire induced contribution to core damage frequency for Cook Nuclear Plant.Finally, in accordance with 10CFR50.59 and the guidance provided in NSAC-125, an unreviewed safety question determination was performed.
Multi-input: alarms without reflash are used     if the quantity, sequence or combination of alarm inputs does not change the priority of the alarm, the identity of the alarm condition is available at a local panel or on a hard copy printout (or status it light), and does not significantly affect the nature of or the time required to implement the initial corrective action in response to the alarm condition.
It was concluded, therein, that cancellation of the reflash modification will not constitute an unreviewed safety question per 10CFR50.59(a)(2), nor does it constitute a significant hazard to the health and safety of the public.
Unit control room fire annunciator panels consist of 150 drops.
ATTACHMENT 2 TO AEP'NRC'0692CU COST BENEFICIAL LICENSING ACTION (CBLA)REVISION OF PLANS TO INSTALL REFLASH CAPABILITY FOR THE CONTROL ROOM FIRE ANNUNCIATOR PANELS  
Drop ¹41, labeled FIRE, is a red drop (first priority alarm) and was designed to clearly indicate actuation of fire protection systems. This drop is only energized in conjunction with another drop which identifies the actuating equipment or to signal that the other control room has received their drop ¹41 alarm. Other fire panel drops are either red (first priority alarm) indicating system actuation, amber (second priority) for abnormal conditions, or white (third priority) which also indicate syst: em trouble.
~~I Attachment 2 to AEP:NRC:0692CU Page 1 Regulatory Requirement:
The annunciator response procedures indicate the areas and/or equipment associated with each drop. For multi-input drops which monitor a large number of zones, the procedures require that,     if the annunciator or fire detection zone light remains illuminated, then the operator must monitor the status lights at the top of the fire protection panel once per hour (administratively, once per 30 minutes) for other alarms. The status lights tell the operator which fire protection zone has the abnormal condition.           The requirement to monitor- the fire panel is reiterated in the "Standing Fire Detection Alarm" data sheet which is used to document and track standing alarms on a 30 minute frequency.
A commitment was made in AEP:NRC:0692BT and AEP:NRC:0692BY, to install reflash capability for the control room fire annunciator panels.I Effect of Requirement:
In addition, standing alarms associated with Technical Specification required detectors located outside of containment require hourly fire watch patrols to inspect the affected zone(s).
Installation of reflash capability for the control room fire annunciator panels will make these panels inconsistent with the other control room panels, and may result in a human factors concern.Additionally, reflash capability will not result in a significant reduction of plant fire risk.Rationale for Regulatory Change: The availability of fire protection defense-in-depth measures ensures plant fire safety.These defense measures include the widespread use of fire detection and fixed suppression systems throughout the plant, the availability of manual fire suppression equipment, e.g., portable extinguishers and hose stations, the existence of a trained plant fire brigade, and the generally low fire loadings present throughout the plant.Based on the justification provided in Attachment 1 and defense-in-depth strategies, installation of reflash will not provide a reduction in plant fire risk commensurate with the cost.Approximate Cost of Requirement:
Detectors located inside containment have different parameter to AEP:NRC:0692CU                             Page 3 monitoring requirements such as monitoring containment air temperatures. Also, certain drops, such as drop ¹94 "REACTOR COOLANT PUMP FIRE OR ABN," simultaneously annunciate       abnormal conditions on their'ssociated system panel. For example, a fire condition illuminating drop ¹94 will have an associated alarm on the reactor coolant pump (RCP) panel (located in the control room) indicating the specific affected RCP.
The minimum cost to install reflash capability for the control room fire panels is$2,421,000 (1993 dollars).This cost does not include any software changes, seismic supports for cable/conduit routing, modifications to the simulator, or replacement of window drop boxes.
The control room operators are trained not to tolerate standing alarms and faulted detector circuits are promptly repaired and well maintained under a comprehensive surveillance and maintenance schedule in accordance with Technical Specifications.     Standing abnormal alarms are tracked on a daily basis by management and action is taken to keep the number of standing alarms to a minimum.
-R J Jg}}
Plant procedures and Technical Specifications require that     fire watches be established for inoperable equipment and systems     that could affect the safety of the plant. The utilization of local fire indicating/control panels by fire watch personnel provides added assurance that those areas which are monitored by multi-input drops in the control room are being adequately surveyed to preclude potential masking of abnormal fire protection conditions.
The Detailed Control   Room Design Review   (DCRDR) examined   all multi-input drops and the annunciator response procedures to determine if reflash and/or printout capability would be needed or advantageous. The conclusion of the DCRDR was that no reflash of multi-input alarms was required and that the benefits of reflash would not be cost justified. Irrespective of this conclusion, an effort was made during the DCRDR to address the need to add alarms to the Plant Process Computer (PPC) in lieu of splitting multi-input alarms or installing reflash circuits and,   it was concluded that adding alarms to the PPC would not, in general, be of value based on operations procedures and the overall control room annunciator design.
In conclusion, the integrated use of the control room fire panel along with the associated       status . lights, the local fire annunciator panels, the annunciator response procedures, and other control room annunciator panels, provides the necessary information to identity different alarm signals associated with multi-input drops. In addition, the comprehensive surveillance to AEP:NRC:0692CU                               Page 4 and maintenance   of detector circuits and the low probability of automatic detection system failure, further supports the conclusion that reflash capability will not have a significant plant safety benefit.
I Based upon these reviews, the installation of   ref lash capability for the control room fire annunciator panels       clearly will not provide a significant reduction in plant risk.         In addition, installation of reflash capability is not required for compliance with 10 CFR Part 50 Appendix R, for licensing commitments pursuant to NFPA compliance, or for compliance with the guidance provided in Appendix A to BTP APCSB 9.5-1 and our response to the BTP dated January 31, 1977.
To support'he     above evaluations,   we have also reviewed the results of the Individual Plant Examination of External Events (IPEEE) Fire Analysis completed in April 1992.         Based on the results of this evaluation, it is concluded that reflash capability will not impact the results of the fire Probabilistic Risk Assessment (PRA). Installation of reflash capability will not reduce the fire induced contribution to core damage frequency for Cook Nuclear Plant.
Finally, in accordance with 10CFR50.59 and the guidance provided in NSAC-125, an unreviewed safety question determination was performed. It was concluded, therein, that cancellation of the reflash modification will not constitute an unreviewed safety question per 10CFR50.59(a)(2),         nor does   it   constitute a significant hazard to the health and safety of the public.
 
ATTACHMENT 2 TO AEP'NRC'0692CU COST BENEFICIAL LICENSING ACTION (CBLA)
REVISION OF PLANS TO INSTALL REFLASH CAPABILITY FOR THE CONTROL ROOM FIRE ANNUNCIATOR PANELS
 
~ ~
I Attachment 2 to AEP:NRC:0692CU                               Page 1 Regulatory Requirement:
A commitment was made     in AEP:NRC:0692BT and AEP:NRC:0692BY, to install reflash capability for the control room           fire annunciator panels.                                     I Effect of Requirement:
Installation of reflash capability for the control room fire annunciator panels will make these panels inconsistent with the other control room panels, and may result in a human factors concern. Additionally, reflash capability will not result in   a significant reduction of plant fire risk.
Rationale for Regulatory Change:
The   availability of fire protection defense-in-depth measures   ensures plant fire safety. These defense measures include the widespread use of fire detection and fixed suppression systems throughout the plant, the availability of manual fire suppression equipment, e.g., portable extinguishers and hose stations, the existence of a trained plant fire brigade, and the generally low fire loadings present throughout the plant.
Based   on the justification provided in Attachment 1 and defense-in-depth strategies, installation of reflash will not provide a reduction in plant fire risk commensurate with the cost.
Approximate Cost of Requirement:
The minimum     cost to install reflash capability for the control room   fire panels is $ 2,421,000 (1993 dollars). This cost does not    include any software changes, seismic supports for cable/conduit routing, modifications to the simulator, or replacement of window drop boxes.
 
    -R J
Jg}}

Latest revision as of 01:24, 4 February 2020

Revises 900221 Submittal in Response to NRC 890914 RAI Re post-fire Safe Shutdown Methodology at Plant.Reflash Mod Cancelled.Detailed Justiification to Support Cancelling Reflash Mod Encl
ML17332A279
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/24/1994
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Russell W
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:0692CU, AEP:NRC:692CU, NUDOCS 9409020190
Download: ML17332A279 (12)


Text

RIORITY PACCELERATED 1 RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9409020190 DOC.DATE: 94/08/24 NOTARIZED: NO DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME AUTHOR AFFILIATION P FITZPATRICK,E.E Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME RECIPIENT AFFILIATION RUSSELL,W.T. Document Control Branch (Document Control Desk) R

SUBJECT:

Informs of revision to 900221 ltr in response to RAI re post-fire safe shutdown methodology at util. Installing reflash capability in control rooms is cancelled.

DISTRIBUTION CODE: A006D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR/Licensing Submittal: Fire Protection App R GL-88-12 NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 LA 1 0 PD3-1 PD 1 1 HICKMAN,J 2 2 INTERNAL: NRR/DSSA/SPLB 1 1 NUDOCS-ABSTRACT 1 1 OC/LEDC 1 0 OGC/HDS2 1 0 R~FTL 01 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D

0 C

U E

NOTE TO ALL"RIDS RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS I'OR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 8

'1 I

Indiana Michigan Power Company P.O. Box 16631 Columbus, OH 43216 AEP:NRC:0692CU Donald C. Cook Nuclear Plant Units 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 REVISION OF PLANS TO INSTALL REFLASH CAPABILITY FOR THE CONTROL ROOM FIRE ANNUNCIATOR PANELS U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Attn: W. T. Russell August 24, 1994

Dear Mr. Russell:

The purpose of this letter is to revise previous information submitted February 21, 1990, (AEP:NRC:0692BT), in response to a September 14, 1989, NRC Request for Additional Information (RAI),

regarding post-fire safe shutdown methodology at Donald C. Cook Nuclear Plant. On page 13, of Attachment 1, of AEP:NRC:0692BT, we committed to install "detection system reflash capability in the control rooms", and indicated that this "modification is being developed with a target completion by December 1991." The commitment was not required by the RAI but, at that time, was believed to be a desirable enhancement.

On December 2, 1991, we submitted AEP:NRC:0692BY, and noted therein that the fire alarm reflash project had to be rescheduled for completion by December 31, 1994, due to the complexity of the project. After extensive review, we have concluded that the cost of installing reflash capability will not have a commensurate safety. benefit, -and may not be technically desirable. This conclusion was based on operator interviews, fire alarm system walkdowns, review of the Fire Probabilistic Risk Assessment (PRA),

review of the Detailed Control Room Design Review (DCRDR),

engineering evaluations of the fire annunciator panels, and a review of fire detection corrective and preventive maintenance procedures. Attachment 1 to this letter provides detailed justification to support cancelling the reflash modification.

QOUA g 9409020190 'F40824 PDR ADOCK 05000315

.F., PDR

Mr. W. T. Russell AEP:NRC:0692CU In addition, this is a Cost Beneficial Licensing Action (CBLA).

The lifetime cost savings associated with this CBLA are approximately $ 2,421,000, as detailed in Attachment 2.

Sincerely, E. E. Fitzpatrick Vice President cad Attachments cc: A. A. Blind G. Charnoff J. B. Martin NFEM Section Chief NRC Resident Inspector - Bridgman J. R. Padgett

ATTACHMENT 1 TO AEP:NRC:0692CU REVISION OF PLANS TO INSTALL REFLASH CAPABILITY FOR THE CONTROL ROOM FIRE ANNUNCIATOR PANELS to AEP:NRC:0692CU Page 1 During a November 1989 meeting with NRR and Region III staff at Cook Nuclear Plant, the maintenance and surveillance of our Technical Specification (T/S) 3/4.7.10, "Fire Related Assemblies,"

was discussed. A miscellaneous issue was discussed regardjng fire alarm system circuit supervision. During this discussi'on, NRC if staff inquired the alarm system had a "reflash" capability. In response to the NRC inquiry, we indicated that reflash capability would be installed.

On February 21, 1990, we submitted AEP:NRC:0692BT, in response to NRC Request for Additional Information regarding post-fire safe shutdown methodology. On page 13 of Attachment 1, we committed to install "detection system reflash capability in the control rooms" and indicated that this "modification is being developed with a target completion by December 1991." On December .2, 1991, we submitted AEP:NRC:0692BY and noted therein that the fire alarm reflash project would be rescheduled for completion by December 31, 1994, due to the complexity of the project.

In accordance with our commitment to install reflash on the control room fire panels, a plant modification (12-PM-1015) was opened. This plant modification was subsequently closed when it was realized that the scope of work was significantly more resource intensive than initially envisioned and would require a corporate (AEPSC) design change. Subsequent reviews and evaluations have now determined that reflash cannot be installed for the fire panels for less than a minimum cost of approximately

$ 2,421,000 (1993 dollars, for both units excluding the simulator).

The fire annunciator panels in the Cook Nuclear Plant control rooms have a simple operating sequence consistent with the rest of the control room annunciator panels. When the input to an annunciator drop changes from normal to abnormal, the drop will begin to flash and sound an audible alarm. The operator acknowledges the alarm by pushing the associated drop (which is also a push button switch) which silences the audible alarm and results in a standing (solid) visual alarm. When the condition clears, the light will flash again, along with an audible signal, until the drop is'epressed.

The Cook Nuclear Plant control room annunciator system was designed to provide plant monitoring functions and to address human factors concerns. This was achieved, in part, by the utilization of shared alarm point inputs (multi-input drops).

This enables each drop to accept multiple process signals to provide necessary information without distracting operators with to AEP:NRC:0692CU Page 2 redundant or "low-level" information. In general, multiple alarm point inputs are logically grouped by system function and/or physical location (e.g., fire protection alarms for all four reactor coolant pumps are grouped together onto one annunciator drop). When the first abnormal condition occurs, the alarm point can return to normal only after all associated input conditions have returned to normal. Subsequent abnormal conditions would not "reflash" that alarm point while a previous abnormal condition still exists.

Cook Nuclear Plant utilizes multi-input: drops in accordance with NUREG-0700 and the AEP system control room design philosophy.

Multi-input: alarms without reflash are used if the quantity, sequence or combination of alarm inputs does not change the priority of the alarm, the identity of the alarm condition is available at a local panel or on a hard copy printout (or status it light), and does not significantly affect the nature of or the time required to implement the initial corrective action in response to the alarm condition.

Unit control room fire annunciator panels consist of 150 drops.

Drop ¹41, labeled FIRE, is a red drop (first priority alarm) and was designed to clearly indicate actuation of fire protection systems. This drop is only energized in conjunction with another drop which identifies the actuating equipment or to signal that the other control room has received their drop ¹41 alarm. Other fire panel drops are either red (first priority alarm) indicating system actuation, amber (second priority) for abnormal conditions, or white (third priority) which also indicate syst: em trouble.

The annunciator response procedures indicate the areas and/or equipment associated with each drop. For multi-input drops which monitor a large number of zones, the procedures require that, if the annunciator or fire detection zone light remains illuminated, then the operator must monitor the status lights at the top of the fire protection panel once per hour (administratively, once per 30 minutes) for other alarms. The status lights tell the operator which fire protection zone has the abnormal condition. The requirement to monitor- the fire panel is reiterated in the "Standing Fire Detection Alarm" data sheet which is used to document and track standing alarms on a 30 minute frequency.

In addition, standing alarms associated with Technical Specification required detectors located outside of containment require hourly fire watch patrols to inspect the affected zone(s).

Detectors located inside containment have different parameter to AEP:NRC:0692CU Page 3 monitoring requirements such as monitoring containment air temperatures. Also, certain drops, such as drop ¹94 "REACTOR COOLANT PUMP FIRE OR ABN," simultaneously annunciate abnormal conditions on their'ssociated system panel. For example, a fire condition illuminating drop ¹94 will have an associated alarm on the reactor coolant pump (RCP) panel (located in the control room) indicating the specific affected RCP.

The control room operators are trained not to tolerate standing alarms and faulted detector circuits are promptly repaired and well maintained under a comprehensive surveillance and maintenance schedule in accordance with Technical Specifications. Standing abnormal alarms are tracked on a daily basis by management and action is taken to keep the number of standing alarms to a minimum.

Plant procedures and Technical Specifications require that fire watches be established for inoperable equipment and systems that could affect the safety of the plant. The utilization of local fire indicating/control panels by fire watch personnel provides added assurance that those areas which are monitored by multi-input drops in the control room are being adequately surveyed to preclude potential masking of abnormal fire protection conditions.

The Detailed Control Room Design Review (DCRDR) examined all multi-input drops and the annunciator response procedures to determine if reflash and/or printout capability would be needed or advantageous. The conclusion of the DCRDR was that no reflash of multi-input alarms was required and that the benefits of reflash would not be cost justified. Irrespective of this conclusion, an effort was made during the DCRDR to address the need to add alarms to the Plant Process Computer (PPC) in lieu of splitting multi-input alarms or installing reflash circuits and, it was concluded that adding alarms to the PPC would not, in general, be of value based on operations procedures and the overall control room annunciator design.

In conclusion, the integrated use of the control room fire panel along with the associated status . lights, the local fire annunciator panels, the annunciator response procedures, and other control room annunciator panels, provides the necessary information to identity different alarm signals associated with multi-input drops. In addition, the comprehensive surveillance to AEP:NRC:0692CU Page 4 and maintenance of detector circuits and the low probability of automatic detection system failure, further supports the conclusion that reflash capability will not have a significant plant safety benefit.

I Based upon these reviews, the installation of ref lash capability for the control room fire annunciator panels clearly will not provide a significant reduction in plant risk. In addition, installation of reflash capability is not required for compliance with 10 CFR Part 50 Appendix R, for licensing commitments pursuant to NFPA compliance, or for compliance with the guidance provided in Appendix A to BTP APCSB 9.5-1 and our response to the BTP dated January 31, 1977.

To support'he above evaluations, we have also reviewed the results of the Individual Plant Examination of External Events (IPEEE) Fire Analysis completed in April 1992. Based on the results of this evaluation, it is concluded that reflash capability will not impact the results of the fire Probabilistic Risk Assessment (PRA). Installation of reflash capability will not reduce the fire induced contribution to core damage frequency for Cook Nuclear Plant.

Finally, in accordance with 10CFR50.59 and the guidance provided in NSAC-125, an unreviewed safety question determination was performed. It was concluded, therein, that cancellation of the reflash modification will not constitute an unreviewed safety question per 10CFR50.59(a)(2), nor does it constitute a significant hazard to the health and safety of the public.

ATTACHMENT 2 TO AEP'NRC'0692CU COST BENEFICIAL LICENSING ACTION (CBLA)

REVISION OF PLANS TO INSTALL REFLASH CAPABILITY FOR THE CONTROL ROOM FIRE ANNUNCIATOR PANELS

~ ~

I Attachment 2 to AEP:NRC:0692CU Page 1 Regulatory Requirement:

A commitment was made in AEP:NRC:0692BT and AEP:NRC:0692BY, to install reflash capability for the control room fire annunciator panels. I Effect of Requirement:

Installation of reflash capability for the control room fire annunciator panels will make these panels inconsistent with the other control room panels, and may result in a human factors concern. Additionally, reflash capability will not result in a significant reduction of plant fire risk.

Rationale for Regulatory Change:

The availability of fire protection defense-in-depth measures ensures plant fire safety. These defense measures include the widespread use of fire detection and fixed suppression systems throughout the plant, the availability of manual fire suppression equipment, e.g., portable extinguishers and hose stations, the existence of a trained plant fire brigade, and the generally low fire loadings present throughout the plant.

Based on the justification provided in Attachment 1 and defense-in-depth strategies, installation of reflash will not provide a reduction in plant fire risk commensurate with the cost.

Approximate Cost of Requirement:

The minimum cost to install reflash capability for the control room fire panels is $ 2,421,000 (1993 dollars). This cost does not include any software changes, seismic supports for cable/conduit routing, modifications to the simulator, or replacement of window drop boxes.