| issue date = 05/30/1997
| issue date = 05/30/1997
| title = LER 97-006-01:on 970327,equipment in Containment Rendered Inoperable Due to Cracked Floodup Tubes Identified.Caused by Work Practices That Resulted in Two Separate Types of Failures.Critical Areas inspected.W/970530 Ltr
| title = LER 97-006-01:on 970327,equipment in Containment Rendered Inoperable Due to Cracked Floodup Tubes Identified.Caused by Work Practices That Resulted in Two Separate Types of Failures.Critical Areas inspected.W/970530 Ltr
| author name = BLIND A A, FINISSI M
| author name = Blind A, Finissi M
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORYREGULATOINFORMATION DISTRIBUTION TEM(RIDS)ACCESSION NBR:9706050294 DOC.DATE:
{{#Wiki_filter:CATEGORY REGULATO      INFORMATION DISTRIBUTION           TEM (RIDS)
97/05/30NOTARIZED:
ACCESSION NBR:9706050294           DOC.DATE:   97/05/30    NOTARIZED: NO          DOCKET FACZL:50;315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AOTH.QAME     'UTHOR          AFFILIATION t
NODOCKETFACZL:50;315 DonaldC.CookNuclearPowerPlant,Unit1,IndianaM05000315tAOTH.QAME
FINZSSZ,M.           Indiana Michigan Power Co. (formerly Indiana & Michigan Ele BLIND,A.A.           Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME           RECIPIENT AFFILIATION
'UTHORAFFILIATION FINZSSZ,M.
IndianaMichiganPowerCo.(formerly Indiana&MichiganEleBLIND,A.A.
IndianaMichiganPowerCo.(formerly Indiana&MichiganEleRECIP.NAME RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
LER97-006-01:on 970327,equipment incontainment renderedinoperable duetocrackedflooduptubeswasidentified.
LER    97-006-01:on 970327,equipment in containment rendered inoperable due to cracked floodup tubes was identified.
Causedbyworkpractices thatresultedintwoseparatetypesoffailures.
Caused by work practices that resulted in two separate types of failures. Critical areas inspected.W/970530           ltr.
Criticalareasinspected.W/970530 ltr.DISTRIBUTION CODE:.IE22TCOPIESRECEIVED:LTR ENCLSIZE:TITLE:50.73/50.9 LicenseeEventReport(LER),IncidentRpt,etc.NOTES:EINTERNAL:
DISTRIBUTION CODE: .IE22T      COPIES RECEIVED:LTR         ENCL      SIZE:
RECIPIENT IDCODE/NAME PD3-3PDFILECENTERNRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRPM/PECB NRR/DSSA/SRXB RGN3FILE01COPIESLTTRENCL112211111111111111RECIPIENT IDCODE/NAME HICKMAN,J AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HICB NRR/DRCH/HQMB NRR/DSSA/SPLB RES/DET/EIB COPIESLTTRENCL11111111111111l,lDEXTERNAL:
TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.                       E NOTES:
LSTLOBBYWARDNOACPOORE,W.NRCPDR1111~11LITCOBRYCE,JHNOACQUEENER,DS NUDOCSFULLTXT111111UNNOTETOALL"RIDS"RECIPIENTS:
RECIPIENT           COPIES            RECIPIENT            COPIES ID CODE/NAME          LTTR ENCL        ID CODE/NAME         LTTR ENCL PD3-3 PD                  1    1      HICKMAN,J               1    1 INTERNAL:                            2    2      AEOD/SPD/RRAB           1    1 FILE  CENTER            1    1      NRR/DE/ECGB             1    1 1    1      NRR/DE/EMEB             1    1 NRR/DRCH/HHFB            1    1      NRR/DRCH/HICB           1    1 NRR/DRCH/HOLB NRR/DRPM/PECB NRR/DSSA/SRXB RGN3    FILE    01 1
PLEASEHELPUSTOREDUCEWASTETHCONTACTTHEDOCUMENTCONTROLDESKiROOMOWFN5D-5(EXT.
1 1
415-2083)
1 1
TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEED!FULLTEXTCONVERSION REQUIREDTOTALNUMBEROFCOPIESRF"ZRED:LTTR24ENC'4 IndianaMichiganPowerCompanyCookNuclearPianiOneCookPlaceBridgman, MI49106IMay30,1997UnitedStatesNuclearRegulatory Commission DocumentControlDeskWashington, DC20555Operating LicensesDPR-58DocketNo.50-315DocumentControlManager:Inaccordance withthecriteriaestablished by10CFR50.73entitledLicenseeEvent~lhfI'gpibig1iltd.'7-006-01 Sincerely, A.A.BlindSiteVicePresident I(ImbdAttachment c:A.B.Beach,RegionIIIE.E.Fitzpatrick P.A.BarrettS.J.BrewerJ.R.PadgettD.HahnRecordsCenter,INPONRCResidentInspector 9706050294 970530PDRADQCK050003i58PDRllllllllllllllllllllllliilllill flillli
1 1
1 NRR/DRCH/HQMB NRR/DSSA/SPLB RES/DET/EIB             l,l 1
1 1
1 D
EXTERNAL: L ST LOBBY WARD            1    1      LITCO BRYCE,J H          1    1 NOAC POORE,W.             1    1 ~     NOAC QUEENER,DS         1    1 NRC PDR                    1    1      NUDOCS FULL TXT          1    1 U
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTETH CONTACT THE DOCUMENT CONTROL DESKi ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES RF "ZRED: LTTR            24  ENC'4


NRCFORM366(5-92)S.NUCLEARREGUULTORY COMMISSION LICENSEEEVIDENTREPORT(LER)ROVEDBYOHBNO.3150-0104 EXPIRES5/31/95ESTIMATED BURDENPERRESPONSETOCOMPLYlllTHTHIINFORMATION'COLLECTIOM REQUEST:50.0MRS.-FORNARCOMMENTSREGARDIHG BURDENESTIMATE ToTHINFORMATION ANDRECORDSMANAGEMENT BRANCH(MMB7714),U.STNUCLEARREGULATORY COMMISSION NASHIMGTON, DC20555-0001, ANDTOTHEPAPERMORREDUCTION PROJECT(3150.0104),
Indiana Michigan I
OFFICE0MANAGEMENT ANDBUDGETNASHINGTOH DC20503.'ACILITY NAME(1),OonaldC.CookNuclearPlant-Unit1DOCKETNUMBER(2)50.315Page1of10TITLE(4)EuimentinContainmentRenderedlno erableDuetoCrackedFloodu TubesMONTHDAYYEAREVENTDATE5YEARLERNUMBER6SEQUENTIAL MUHBERREVISIONNUMBERMOHTHDAYYEARREPORTDATE7FACILITYNAMECook-Unit2DOCKETNUHBER50-316OTHERFACILITIES INVOLVED8279700601053097FACILITYNAMEDOCKETNUMBEROPERATING MODE(9)P(XJERLEVEL(10)0THISREPORTISSUBMITTED PURSUANT20.2201(b) 20.2203a120.2203(a)(2)(i) 20.2203a2ii20.2203(a)(2)(iii) 20.2203(a)(2)(iv)
Power Company Cook Nuclear Piani One Cook Place Bridgman, MI49106 May 30, 1997 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Operating Licenses DPR-58 Docket No. 50-315 Document Control Manager:
?0.2203(a)(2)(v) 20.2203(a){3)(i) 20.2203a3ii20.2203(a)(4) 50.36c150.36(c)(2) 50.73(a)(2)(i) 50.73(a)(2)(ii) 50.73(a)(2){iii) 5073a)(2iv'0.73(a)(2)(v) 50.73a2vii50.73(a)(2)(viii)(A) 50.73(a)(2)(viii)(B) 50.73(a)(2)(x) 73.71(b)73.7toOTHER(SpecifyinAbstractbetouandinText,NRCForm366A)TOTHEREQUIREMENTS OFt0CFR:CheckoneormorettNAMELICENSEECONTACTFORTHISLER12Mr.MikeFinissi,SystemEngineering
    ~lh In accordance with the criteria established by 10 CFR 50.73 entitled Licensee Event f I
-Electrical Supervisor TELEPHONE NUMBER(IncludeAreaCode)616/465-5901, x2830COMPLETEONELINEFOREACHCOMPONENT FAILUREDESCRIBED INTHISREPORT13CAUSESYSTEMCOMPOHEHT MANUFACTURER REPORTABLE TONPRDSCAUSESYSTEHCOMPOHEHT MANUFACTURER REPORTABLE TONPRDSSUPPLEMENTAL REPORTEXPECTED14YES(Ifyes,completeEXPECTEDSUBMISSIOH DATE).XHOEXPECTEDSUBMISSION DATE(15)MONTHDAYYEARABSTRACT(Limitto1400spaces,i.e.,approximately 15single-spaced typevritten tines)(16)ThisLERrevisionisbeingsubmitted toprovideadditional information regarding thesafetysignificance andtherootcausedetermination forcrackedilooduptubes(FUTS)foundinCookUnits1and2.Duringaninspection offiooduptubesformoistureintrusion, 3FUTSwiththruwalldefectswereidentified.
                                  'g p    i big      1 iltd.'7-006-01 Sincerely, I (
Asaresult,pro-activemeasuresweretakentoinspecttheremaining Unit1FUTS.Thisresultedlntheidentification ofsixadditional thruwalldefectsinUnit1.Asaresult,Unit2FUTswereinspected, and2crackedtubeswerefound.Ofthe11totaldamagedtubes,Unit1contained 7FUTSandUnit2contained 1FUTwithanassociated circuitthatisneededforacddentmitigation orpostacddentmonitoring.
A. A. Blind Site Vice President Imbd Attachment c:        A. B. Beach, Region III E. E. Fitzpatrick P. A. Barrett S. J. Brewer J. R. Padgett D.         Hahn Records Center, INPO NRC Resident Inspector 9706050294 970530 PDR  ADQCK 050003i5                                                    llllllllllllllllllllllliilllill flillli 8                          PDR
OnMarch23theUnit2condition wasreportedunder10CFR50.72(b)(1)(ii).
OnMarch27Unit1condition wasreportedunder10CFR50.72(b)(2)g.
ENSnotifications weremadeforboth.Thedamagehasbeenattributed toworkpractices thatresultedintwodifferent typesoffailures-material stresscracksandrandomarcstrikes,mostprobablyearlyinplantNe.AlldamagedUnit1EQFUTShavebeenreplacedandbothUnit2tubeshavebeenreplaced.
Topreventthecracksduetoinstallation practices fromreoccurring, theCookPlantFUTInstallation WorkInstructions willbemodifiedtocontainadditional guidance.
Weldingpractices havebeensuflidently enhancedsincetheearlyportionoftheplantlife topredudearestrikesonFUTS.Inspections oftheFUTSfordamagewillalsobeperformed atthebeginning andtheendoftherefueling outagesuntilassurance isreachedthatnofurtherproblemswerefound.Postulated failuresthatcouldresultfromthecrackedflooduptubeswereevaluated andfoundnottopresentasignifican riskwithregardtotheprotection ofthepublichealthandsafety.
NRCFORH366A~SNUCLEARREGULATORY C(mHISSIONLICENSEE&/ENTCONTINUATION tPPROVEDBYOHB'O.3150.0104 EXPIRES5/31/95ESTIHATED BURDENPERRESPONSETOCOHPLY'WITHTHISIHFORHATION COLLECTION REQUEST:50.0NRS.'ORNARDCOHHEHTSREGARDING BURDENESTIHATETOTHEINFORHATION ANDRECORDSHANAGEHENT'RANCH'HNBB 7714),U.S.NUCLEARREGULATORY COHHISSION, NASHINGTON, DC20555-0001, ANDTOTHEPAPERIJORi(
REDUCTION PROJECT(3150-0104)
~OFFICEOFHANAGEHENT ANDBUDGETMASNINGTON DC20503.FACILITYNAÃE1CookNuclearPlant-Unit1TEXT(ifserespaceisrequired.
useadditicnal iaCFora366A's)(17)50-315LERNUHBER6'EARSEQUENTIAL 97-006REVISION01'PAGE32OF10Conditions PriortoOccurrence Unit1wasinMode6,Refueling Unit2wasinMode1,PowerOperation, at100percentRatedThermalPowerDescritlonofEventElectrical penetrations attheD.C.CookNuclearplantarelocatedbelowthepredicted floodinglevelinsidecontainment following alossofcoolantaccident.
Asaresult,safetyrelatedcablesareroutedthroughstainless steeltubes,knownasflooduptubes,whichpreventthewaterinthecontainment fromcontacting thecables.Thisprecaution isnecessary becausetheelectrical cableshavenotbeenenvironmentally qua1ified forsubmergence inwater.AllKatponwiresbelowflooduplevelsneededforEQarecontained inaflooduptube.ThereisnootherEQequipment belowflooduplevelwhichneedsflooduptubestomaintainitsqualification.
AsaresultofLER316/96-006-00, whichwaswrittentodocumentthediscovery ofmoistureintrusion intoFUTsduringUnit2's1996refueling outage,onethirdofUnit1'sFUTswereinspected formoistureintrusion duringits1997refueling outage.Duringtheflooduptubeinspection, ninetubesinUnit1werefoundtohavecrackswhichwouldallowwaterintrusion following alossofcoolantaccident.
AsaresultoftheUnit1findings, theflooduptubesinUnit2wereinspected, andtwocrackedtubeswerediscovered.
Thecablesthatarecontained insidetheflooduptubesareKaptoninsulated, andareviewofpartialtestdataforKaptoninsulated wiresinhighpHsolutions hasledtotheconclusion thatcablefailuresmayoccuraftertw'ohoursofsubmergence inthehighpHsolution(9to10)thatwouldfloodthelowercontainment following alossofcoolantaccident.
TheUnit1tubeswereinspected duringtheperiodMarch16,1997throughMarch23,1997.Following theinspection, thefollowing equipment whichisrequiredforaccidentmitigation orpostaccidentmonitoring wasidentified asadversely impactedbytheexistence ofacrackedfiooduptube:1-8LP-1321-BLP-142 1-NTR-140 1-NTR-240 1-HR-11-VMO-102SteamGenerator threenarrowrange(EIIS/IP-LT) leveltransmitter SteamGenerator fournarrowrange(EIIS/IP-LT) leveltransmitter Reactorcoolantloop4hotlegwide(EIIS/TR) rangetemperature recorderthermalsensorReactorcoolantloop4coldlegwide(EIIS/TR) rangetemperature recorderthermalsensorHydrogenRecombiner (EIIS/BB-RCB)
Containment HydrogenSkimmer(EIIS/BB-IV) ventilation fanHV-CEQ-2suctionshutoffvalve


HRCFORH366A.S.NUCLEARREGULATORY COXHISSIOHLICENSEEZWHNTCONTINUATION
NRC FORM    366                                    S. NUCLEAR REGUULTORY COMMISSION                        ROVED BY OHB NO.                   3150-0104 (5-92)                                                                                                              EXPIRES                5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY lllTH THI INFORMATION'COLLECTIOM REQUEST: 50.0 MRS. - FORNAR LICENSEE        EVIDENT    REPORT        (LER)                      COMMENTS      REGARDIHG                    BURDEN    ESTIMATE To              TH INFORMATION AND RECORDS MANAGEMENT BRANCH (MMB 7714), U.ST NUCLEAR REGULATORY COMMISSION NASHIMGTON, DC 20555-0001, AND TO THE PAPERMOR REDUCTION       PROJECT                    (3150.0104),     OFFICE              0 MANAGEMENT AND BUDGET NASHINGTOH DC 20503.'ACILITY NAME  (1),                                                                    DOCKET NUMBER      (2)                               Page  1  of 10 Oonald C. Cook Nuclear Plant - Unit 1                                                            50.315 TITLE    (4)
&PROVEDBYQS'NO.3150-0104 EXPIRES5/31/95ESTIHATED BURDENPERRESPONSE'TO COHPLYMITHTHISINFORHATION COLLECTION REQUEST:50.0HRS.FORMARDCOHHEHTSREGARDIHG BURDENESTIMATETOTHEIHFORHATIOH AHDRECORDSHANAGEHEHT.
E ui mentinContainmentRenderedlno                erableDuetoCrackedFloodu            Tubes EVENT DATE    5                  LER NUMBER 6                    REPORT DATE    7                  OTHER    FACILITIES INVOLVED 8 SEQUENTIAL        REVISION                          FACILITY NAME                                        DOCKET NUHBER MONTH      DAY      YEAR    YEAR MUHBER          NUMBER MOHTH    DAY    YEAR Cook - Unit 2                                        50-316 FACILITY NAME                                        DOCKET NUMBER 27        97                  006              01        05      30      97 OPERATING                THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF        t0  CFR    :    Check one                  or more    tt MODE    (9)                 20.2201(b)                         20.2203(a){3)(i)                  50.73(a)(2){iii)                               73.71 (b)
BRANCH(HHBB7714),U.S.NUCLEARREGULATORY COHHISSIOHg MASHINGTON, DC20555-0001, AND-TOTHEPAPERMORK REDUCTION PROJECt(3150-0104),
P(XJER 0
OFFICEOFHANAGEHENT ANDBUDGETMASHIHGTOH DC20503;,FACILITYMAKE1CookNuclearPlant-Unit150-315LERHUHBER6YEARSEQUEHTIAL 97-006REVISION01~I~t4rraua3OF10TEXT((fcerespaceisrequ(red.
20.2203 a    1                       20.2203 a  3  ii              50 73    a)(2                                  73.7to LEVEL    (10)                 20.2203(a)(2)(i)                    20.2203(a)(4)                                     iv'0.73(a)(2)(v)
useaddit(onal NRCForm366A's)(17)DescritionofEventcont'd1-NSO-021 ReactorCoolantSystempost-accident (EIIS/AB-VTV) venttrainAsolenoidvalve1-IMO-315 EastRHRandNorthSafetyInjection to(EIIS/BO-INV) reactorcoolantloops1and4hotlegsshutoffvalve1-IMO-316 EastRHRandNorthSafetyInjection to(EIIS/BO-INV) reactorcoolantloops1and4coldlegsshutoffvalve1-IMO-325 WestRHRandsouthsafetyinjection to(EIIS/BO-INV) reactorcoolantloops2and3hotlegsshutoffvalve1-NMO-151Pressurizer reliefvalveNRV-151(EIIS/AB-ISV) upstreamshutoffvalve1-33-NRV-153 Pressurizer trainApressurereliefvalveNRV-153closelimitswitchTheUnit2flooduptubeswereinspected onMarch23,1997.Atthattime,acrackwasfoundintheflooduptube2-IP3-3.Thisflooduptubecontainsacablewhichsuppliespowertooneoftwocontainment recirculation (CEQ)fans(EIIS/BB-FAN).
OTHER 20.2203 a    2  ii                50.36 c    1                    50.73 a      2  vii                        (Specify in 20.2203(a)(2)(iii)                  50.36(c)(2)                      50.73(a)(2)(viii)(A)                        Abstract betou and in Text, 20.2203(a)(2)(iv)                  50.73(a)(2)(i)                    50.73(a)(2)(viii)(B)                       NRC  Form 366A)
TheCEQfansoperatelongtermfollowing alossofcoolantaccident, andabsentqualification dataforwatersubmergence, continued operation oftheimpactedCEQfancouldnotbeguaranteed.
                                ?0.2203(a)(2)(v)                   50.73(a)(2)(ii)                 50.73(a)(2)(x)
CauseoftheEventThetubedamagehasbeenattributed toworkpractices thatresultedintwoseparatetypesoffailures-material stresscracksandrandomarcstrikes,mostprobablyearlyintheplantlife.Inthreeisolatedinstances, unrelated tothematerialstresscracks,thetubeexhibited holesinthetubeapproximately 1/8"-1/4" wide.Theseholeshadaburnedappearance suchthattheymayhavebeencausedbyweldingactivities inthevicinityoftheflooduptubes.Theothercauseisduetolocalized stressestothematerialatthepointwherethetubetransitions fromflexibletoarigidconfiguration.
LICENSEE CONTACT FOR THIS LER      12 NAME                                                                                                  TELEPHONE NUMBER                    (Include Area      Code)
Thecausalanalysisevaluated thebasictubeconstruction, inspected damagedtubes,andperformed aninspection ontheinstallation intheannulus.Theflooduptubeconstruction isastandardsingle-ply helicalcorrugated bellowsthatisconstructed fromaType321stainless steel.BothendsoftheflooduptubeareweldedtoaType304stainless steelfittingwithmalethreads.Thefittingsconstitute arigidpointwhilethebellowsthemselves areaflexiblemember.Thistypeofconstruction allowsthetubetoflexuniformly throughout itsentirelengthexceptatthepointwhereitconnectstothefittings.
Mr. Mike Finissi, System Engineering - Electrical Supervisor                                      616/465-5901, x2830 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED        IN THIS    REPORT    13 REPORTABLE                                                                                        REPORTABLE CAUSE      SYSTEM      COMPOHEHT    MANUFACTURER                              CAUSE    SYSTEH      COMPOHEHT                      MANUFACTURER TO NPRDS                                                                                            TO NPRDS SUPPLEMENTAL REPORT EXPECTED      14                                  EXPECTED                              MONTH        DAY                YEAR YES                                                                                          SUBMISSION (If yes,    complete  EXPECTED SUBMISSIOH DATE).                  X  HO DATE (15)
HRCFORN366A.S.NUCLEARREGUULTORY COXNISSIOM LICENSEELWENTCONTINUATION ROVEDBYONBNO.3150-01,04 EXPIRES5/31/95ESTINATED BURDENPERRESPOHSETO'COHPLY MITHTHISIHFORHATIOH COLLECTIOH REQUEST:50.0NRS;FORNARDCONHEHTSREGARDING BURDENESTINATETOTHEINFORNATION ANDRECORDSNANAGEHEHT BRANCH"(NHBB7714),U.S.NUCLEARREGULATORY COHHISSION, IIASHIHGTON, DC20555-0001, AHDTOTHEPAPERHORK REDUCTION PROJECT(3150-0104),
ABSTRACT    (Limit to  1400 spaces,  i.e.,  approximately  15 single-spaced typevritten tines) (16)
OFFICEOFHANAGEHEHT ANDBUDGETMASHINGTOH DC20503.FACILITYMANE1CookNuclearPlant-Unit1TEXT(ifsorespaceisrequired.
This LER revision is being submitted to provide additional information regarding the safety significance and the root cause determination for cracked iloodup tubes (FUTS) found in Cook Units 1 and 2.
useadditional HRCFore366A's)(17)CauseoftheEventcont'dDOCKETNU)IBER250-315YEAR97LERNIGER6SEQUENTIAL REVISICH01PAGE34OF10Anexamination oftwocrackedtubeswhichhadthissecondtypeoffailurewasperformed byDCCNPmetallurgical engineers
During an inspection of fioodup tubes for moisture intrusion, 3 FUTS with thru wall defects were identified. As a result, pro-active measures were taken to inspect the remaining Unit 1 FUTS. This resulted ln the identification of six additional thru wall defects in Unit 1. As a result, Unit 2 FUTs were inspected, and 2 cracked tubes were found. Of the 11 total damaged tubes, Unit 1 contained 7 FUTS and Unit 2 contained 1 FUT with an associated circuit that is needed for acddent mitigation or post acddent monitoring. On March 23 the Unit 2 condition was reported under 10CFR50.72(b)(1)(ii). On March 27 Unit 1 condition was reported under 10CFR50.72(b)(2)g. ENS notifications were made for both.
.Aportionoftheirinvestigation follows:"Anexamination oftwotypically crackedtubesrevealeda3/4"longlinearindication orientedparalleltothecorrugation attherootofaconvolution.
The damage has been attributed to work practices that resulted in two different types of failures-material stress cracks and random arc strikes, most probably early in plant Ne. All damaged Unit 1 EQ FUTS have been replaced and both Unit 2 tubes have been replaced. To prevent the cracks due to installation practices from reoccurring, the Cook Plant FUT Installation Work Instructions will be modified to contain additional guidance. Welding practices have been suflidently enhanced since the early portion ofthe plantlife to predude are strikes onFUTS. Inspections of the FUTS for damage will also be performed at the beginning and the end of the refueling outages until assurance is reached that no further problems were found.
Thecrackwaslocatedadistanceoftwoconvolutions fromtheweldattaching thebellowstothethreadedfitting.Oneendofthecrack,hadaY-pattern crackthatisindicative ofacrackinitiation pointduetoexcessive bendingstressinthethinmaterial.
Postulated failures that could result from the cracked floodup tubes were evaluated and found not to present a significan risk with regard to the protection of the public health and safety.
Duetothecrack'slocation, thedefectisnotweldingrelated.Althoughnotusedinthisapplication, thecorrugated bellowsiscapableofwithstanding motion,lateraloffset,angularrotation, aswellasaxialextension andcompression overtheentirelengthoftheflooduptube.However,withinalocalized region,suchaswherethebellowsareattachedtothethreadedfitting,thebellowstransitions fromflexibletorigid.Atthislocation, thethinbellowsmaterialwillnotwithstand anybendingortorsional rotationloading."
Theflooduptubeinstallation intheannuluswasreviewedtodetermine whichconfiguration wasmorepronetofailure.Itwasfoundthatallthoseflooduptubesthathavethistypeofdefectwereinthoseinstallations wherethereisaminimumofseventubesperpenetration.
Thisisattributed tothefactthatthosepenetration" installations withmoreflooduptubesalsohavemorestringent bendingrestrictions duetospacerestrictions.
Thefactthatallthesecrackswerenearthefittingendoftheflooduptubeandinthoseinstallations whichrequiresmallerbendingradiiconfirmthatthecrackswereduetolocalized stress.Duetothetype,location, orientation ofthedefectandlackofloadingduringservice,thesedefectsweremostprobablyinitiated inthebellowsduringinstallation orsubsequent rework.AnalsisoftheEventTheseeventsarereportable undertheprovisions of10CFR50.73(a)(2)()l.
(8),operation prohibited bytheplant'stechnical specifications, 10CFR50.73(a)(2)(ii),
anyeventorcondition thatresultedinthecondition ofthenuclearpowerplant,including itsprincipal safetybarriers, beingseriously
: degraded, and10CFR50.73(a)(2)(ii)(B),
acondition whichisoutsideofthedesignbasisoftheplant.Thecablesarerequiredtobeenvironmentally qualified per10CFR50.49.
However,theenvironmental qualification testingdidnotincludesubmerging thecableinwater.PartialtestdataforKaptoninsulated cableshowsthatonetestsamplefailedaftertwohours,andasecondtestsamplefailedafterfortyeighthours.Onthisbasis,itwasdetermined thatKaptoninsulated cablewasnotsuitableforlongtermusesubmerged inasumpsolutionhavingapHof9-10.  


iiRCFORH366AU.S.NUCLEARREGULATORY COO)ISSIONLICENSEEEVENTCONTINUATION APPROVEDBYO)IBNO.3150-0104 EXPIRES5i31/95ESTINATEO BURDENPERRESPONSETOCOHPLYMITHTHISlNFORHATION COLLECTION REaUESTs50.0.HRS.FORMAROCOHHENTSREGARDIHG'BURDEN ESTIHATETO'HEINFORNATION ANDRECORDSHANAGEHENT BRANCH(HNBB7714),U.S.NUCLEARREGULATORY COHHISSIONg MASHINGTOH, DC20555.0001, ANDTOTHEPAPERMORK REDUCTION PROJECT(3150-0104)
NRC FORH    366A                                        ~ S NUCLEAR REGULATORY C(mHI SS I ON            tPPROVED BY  OHB'O. 3150.0104 EXPIRES  5/31/95 ESTIHATED BURDEN PER RESPONSE TO COHPLY 'WITH LICENSEE &/ENT CONTINUATION                                              THIS IHFORHATION COLLECTION REQUEST: 50.0 NRS.
~OFFICEOFHANAGEXENT ANDBUDGETMASHINGTON DC20503.FACILITYNAKE1CookNuclearPlant-Unit1TEXT(ifcerespaceisrequired, useadditional HRCFora366A's)(17)AnalsisoftheEventcont'dDOCKETaRJÃBER250-315YEAR97LERNURSER6SEOUENTIAL REVISION01PAGE35OF10Becausethecracksinfiooduptubesarelocatedbelowthecontainment flooduplevel,water,couldenterthetubeandthecablewouldbesubmerged inasodiumhydroxide solutionhavingapHof9to10.Submergence inthis.solutionwoulddegradetheKaptoninsulation, anditwouldeventually fail.Asthetimetofailure.cannotbeaccurately predicted, anyequipment requiredforIongtermaccidentmitigation wasconsidered tobeinoperable.
COHHEHTS REGARDING BURDEN ESTIHATE TO                  'ORNARD THE INFORHATION AND RECORDS  HANAGEHENT'RANCH'HNBB 7714), U.S. NUCLEAR REGULATORY COHHISSION, NASHINGTON, DC 20555-0001, AND TO THE PAPERIJORi(
Equipment whichcouldcompleteitssafetyfunctionwithintwohoursfollowing theaccidentwasconsidered operableforthepurposeoftheanalysispresented inthisLER.iltisnotpossibletotellwhenthetubesbecamecracked.However,theapparentcauseofthecracks,weldingarcstrikesandstresscracking, indicates thattheyexistedpriortodiscovery.
REDUCTION PROJECT (3150-0104) ~ OFFICE OF HANAGEHENT AND BUDGET    MASNINGTON                DC  20503.
Therefore, itisassumedthattheunitwasinT/S3.0.3,whichisreportable asacondition whichisoutsidethedesignbasisoftheplantandasoperation prohibited bytheplant'stechnical specifications.
FACILITY NAÃE      1                                                        LER NUHBER  6                              'PAGE  3
Theresultoftheevaluation isthat,althoughthepotential forequipment failureplacedtheplantoutsideofitslicensing basisinmanyinstances, therewasnopostulated failurethatisconsidered tohaveamajorimpactwithregardtoprotecting thepublichealthandsafety.Also,inmanycasestheequipment wasbackedupbyunaffected redundant equipment and/orequipment whichco'uldperformasimilarsafetyfunction.
                                                                                              'EAR      SEQUENTIAL    REVISION Cook Nuclear Plant - Unit 1                                                  50-315            97    006                                        2OF10 01 TEXT  (if sere space  is required. use additicnal iaC Fora 366A's) (17)
Unit1NarrowRaneSteamGenerator LevelTransmitters Thenarrowrangesteamgenerator leveltransmitters (1-BLP-132,
Conditions Prior to Occurrence Unit 1 was in Mode 6, Refueling Unit 2 was in Mode 1, Power Operation, at 100 percent Rated Thermal Power Descri tlon of Event Electrical penetrations at the D. C. Cook Nuclear plant are located below the predicted flooding level inside containment following a loss of coolant accident. As a result, safety related cables are routed through stainless steel tubes, known as floodup tubes, which prevent the water in the containment from contacting the cables. This precaution is necessary because the electrical cables have not been environmentally qua1ified for submergence in water. All Katpon wires below floodup levels needed for EQ are contained in a floodup tube. There is no other EQ equipment below floodup level which needs floodup tubes to maintain its qualification.
-142)provideasignaltothereactorprotection system,andtheyareusedforpostaccidentmonitoring ofthesteamgenerator level(Technical specification 3.3.3.8requiresoneoperablechannelpersteamgenerator).
As a result of LER 316/96-006-00, which was written to document the discovery of moisture intrusion into FUTs during Unit 2's 1996 refueling outage, one third of Unit 1's FUTs were inspected for moisture intrusion during its 1997 refueling outage. During the floodup tube inspection, nine tubes in Unit 1 were found to have cracks which would allow water intrusion following a loss of coolant accident. As a result of the Unit 1 findings, the floodup tubes in Unit 2 were inspected, and two cracked tubes were discovered.
Theprotection systemfunctionwouldbeaccomplished priortothecable'sbecomingsubmerged.
The cables that are contained inside the floodup tubes are Kapton insulated, and a review of partial test data for Kapton insulated wires in high pH solutions has led to the conclusion that cable failures may occur after tw'o hours of submergence in the high pH solution (9 to 10) that would flood the lower containment following a loss of coolant accident.
Therearethreenarrowrangesteamgenerator leveltransmitters persteamgenerator, andthepostaccidentmonitoring functioncouldbeaccomplished byeithertheremaining twonarrowrangetransmitters.
The Unit 1 tubes were inspected during the period March 16, 1997 through March 23, 1997. Following the inspection, the following equipment which is required for accident mitigation or post accident monitoring was identified as adversely impacted by the existence of a cracked fioodup tube:
HotLeWideRaneTemeratureRecorderThehotlegwiderangetemperature recorder(1-NTR-140,
1-8LP-1 32              Steam Generator three narrow range (EIIS/IP-LT) level transmitter 1-BLP-142                Steam Generator four narrow range (EIIS/IP-LT) level transmitter 1-NTR-140                Reactor coolant loop 4 hot leg wide (EIIS/TR) range temperature recorder thermal sensor 1-NTR-240                Reactor coolant loop 4 cold leg wide (EIIS/TR) range temperature recorder thermal sensor 1-HR-1                  Hydrogen Recombiner (EIIS/BB-RCB) 1-VMO-1 02              Containment Hydrogen Skimmer (EIIS/BB-IV) ventilation fan HV-CEQ-2 suction shutoff valve
-240)signalisrequiredasinputtotheRCSIsubcooling monitor,andthesubcooling monitoring systemwouldbelesseffective sinceinputtemperatures fromanentireRCSloopwouldbelost.Theoperatoralsohasavailable subcooling indication usingthecoreexitthermocouples.
Thisisactuallythepreferred methodofdetermining subcooling sinceitprovidesconservative results.Thusthelossof1-NTR-140and1-NTR-240 wouldnothavesignificantly impactedplantoperations andisjudgedtohavehadnoadverseimpactonpublichealthandsafety.


MRCFORM366AS.N)CLEARREGULATORY COMMISSION LICENSEE'TTENTCONTlNUATION (NBMO-3150-0104 EXPIRES5/3'I/95ESTIMATED BURDENPERRESPONSETOCOMPLYWITHTHISINFORMATION COLLECTION REQUEST:50.0HRS.FORWARDCOMMENTSREGARDING BURDENESTIMATETOTHEINFORMATION ANORECORDSMANAGEMEHT BRANCH(MNBB7714),U.S.NUCLEARREGULATORY COMHISSIOH
HRC FORH    366A                                        .S. NUCLEAR REGULATORY COXHI SSIOH            &PROVED BY QS'NO. 3150-0104 EXPIRES 5/31/95 ESTIHATED BURDEN PER RESPONSE'TO COHPLY MITH THIS INFORHATION COLLECTION REQUEST: 50.0 HRS.
~WASHINGTON, OC20555-0001, ANOTOTHEPAPERWORK REDUCTION PROJECT(31500104)gOFFICEOFMANAGEMENT ANDBUDGETWASHINGTON DC20503.FACILITYNAMECookNuclearPlant-Unit1TEXTitfNorespaceisrequired.
LICENSEE ZWHNT CONTINUATION                                            FORMARD COHHEHTS REGARDIHG BURDEN ESTIMATE TO THE IHFORHATIOH AHD RECORDS HANAGEHEHT. BRANCH (HHBB 7714), U.S. NUCLEAR REGULATORY COHHISSIOHg MASHINGTON, DC 20555-0001, AND -TO THE PAPERMORK REDUCTION PROJECt (3150-0104), OFFICE OF HANAGEHENT AND BUDGET MASHIHGTOH DC 20503;,
useadditional MICFons3664's)(I7),AnalslsoftheEventcont'd50-31597LERMINBER6SEQUENTIAL REVISION01PAGE36OF10HdroenRecombiner TheCookNuclearPlanthastwohydrogenrecombiners ofwhichonlyoneisrequiredforaccidentmitigation.
                                                                                                                                  ~ I ~ t4 FACILITY MAKE      1                                                      LER HUHBER  6                rraua YEAR    SEQUEHTIAL    REVISION Cook Nuclear Plant- Unit 1                                                  50-315          97    006              01          3 OF 10 TEXT  ((f cere space  is requ(red. use addit(onal NRC Form 366A's) (17)
Onlyoneofthetworecombiners (1-HR-1)wasadversely impactedbyacrackedflooduptube.Thehydrogenrecombiner isusedtomaintainthelong-term hydrogenconcentration insidecontainment below4volumepercent.Althoughtheprincipal meansofhydrogencontrolthatisincludedfntheplantdesignbasisaretwoelectrichydrogenrecombiners combinedwithtwocontainment airrecirculation fans,additional meansofhydrogencontrol,hydrogenigniters, wereaddedtoaddressthepossibility ofexcessive hydrogenconcentrations thatmayexistfollowing asevereaccident.
Descri tion of Event cont'd 1-NSO-021               Reactor Coolant System post-accident (EIIS/AB-VTV)vent train A solenoid valve 1-IMO-315               East RHR and North Safety Injection to (EIIS/BO-INV) reactor coolant loops              1  and 4 hot legs shutoff valve 1-IMO-316               East RHR and North Safety Injection to (EIIS/BO-INV) reactor coolant loops            1  and 4 cold legs shutoff valve 1-IMO-325               West RHR and south safety injection to (EIIS/BO-INV) reactor coolant loops 2 and 3 hot legs shutoff valve 1-NMO-1 51              Pressurizer relief valve NRV-151 (EIIS/AB-ISV) upstream shutoff valve 1-33-NRV-153            Pressurizer train A pressure relief valve NRV-153 close limit switch The Unit 2 floodup tubes were inspected on March 23, 1997. At that time, a crack was found in the floodup tube 2-IP3-3. This floodup tube contains a cable which supplies power to one of two containment recirculation (CEQ) fans (EIIS/BB-FAN). The CEQ fans operate long term following a loss of coolant accident, and absent qualification data for water submergence, continued operation of the impacted CEQ fan could not be guaranteed.
Ananalysishasbeenperformed toshowthattheignitersarecapableofpreventing hydrogenignitionfromendangering thepublichealthandsafetywhenhydrogenconcentrations areexcessively high.Therefore, intheeventthatbothrecombiners weretofail,andthehydrogenconcentrations weretobuilduptoexcessive amounts,itisbelievedthatthehydrogenigniterswouldpreventtheensuingproblemswithhydrogenignitionfromadversely impacting publichealthandsafety.Althoughtheignitersdonothavethedatatosupportlongevity ofoperation, theyarecapableofsupporting operation foratleastoneweek.Itisbelievedthattheigniterswouldlastforperiodsconsiderable beyondthattime.Duringthetimethattherewastotalrelianceonthehydrogenigniters, itmaybepossibletorepairtheunaffected electrichydrogenrecombiner (iftherepaircouldbeperformed outsidethecontainment) orestablish someothermeansoflongtermhydrogencontrol,ifitwerenecessary.
Cause of the Event The tube damage has been attributed to work practices that resulted in two separate types of failures-material stress cracks and random arc strikes, most probably early in the plant life.
Basedonthecombination oftheunlikelihood offailureoftheredundant hydrogenrecombiner, combinedwiththeavailability ofthehydrogenigniters, itisconcluded thattherewouldbeanalmostnegligible chancethatthecracksinthefiooduptubesservicing electrical cablesto1-HR-1wouldhaveresultedinsignificant problemsassociated withhydrogenignitionshouldadesignbasisLOCAhaveoccurredattheplant.Itistherefore concluded thatthecrackintheflooduptubeassociated with1-HR-1didnotrepresent asignificant hazardwithregardtotheprotection ofthepublichealthandsafety.Containment Recirculation FanValveTheCookNuclearPlanthastworecirculation fans,onlyoneofwhichisrequiredforaccidentmitigation.
In three isolated instances, unrelated to the material stress cracks, the tube exhibited holes in the tube approximately 1/8"-1/4" wide. These holes had a burned appearance such that they may have been caused by welding activities in the vicinity of the floodup tubes.
Onlyoneoftherecirculation fanswasimpactedbythecrackedflooduptubecontaining thecableassociated withvalve1-VMO-102.
The other cause is due to localized stresses to the material at the point where the tube transitions from flexible to a rigid configuration. The causal analysis evaluated the basic tube construction, inspected damaged tubes, and performed an inspection on the installation in the annulus.
Thecontainment airrecirculation systemvalveisactivated 10minutesaftertheaccidentoccurs.Basedonpartialtestdatawhichdemonstrate thataminimumoftwohoursisrequiredbeforeKaptoninsulation isdegradedtothepointwhereitisnolongereffective, itisconcluded thatthisvalvewouldhaveperformed itsfunctionpriortotheinsulation's beingsignificantly degraded.
The floodup tube construction is a standard single-ply helical corrugated bellows that is constructed from a Type 321 stainless steel. Both ends of the floodup tube are welded to a Type 304 stainless steel fitting with male threads. The fittings constitute a rigid point while the bellows themselves are a flexible member. This type of construction allows the tube to flex uniformly throughout its entire length except at the point where it connects to the fittings.
MRCFORM366ASN)CI.EARREGULATORY COOIISSIONLICENSEEEVENTCONTINUATION BY(NBMO.3150-0104 EXPIRES5/31/95ESTIMATED BURDENPERRESPONSETOCOMPLYMITHTHISINFORMATION COLLECTION REQUEST:50.0HRS.FORNARDCOMMENTSREGARDING BURDENESTIMATETOTHEINFORMATION AHDRECORDSMANAGEMEHT BRANCH(MHBB7714),U.S.NUCLEARREGULATORY COMMISSION/
MASHIHGTOH, DC20555-0001, ANDTOTHEPAPERNORK REDUCTION PROJECT(3150-0104),
OFFICEOFMANAGEMENT ANDBUDGETllASHIHGTOH DC'20503.
FACILITYMANE1CookNuclearPlant-Unit1TEXT(ifserespaceisrequired.
useadditional NRCFons36Q's)(17)AnalslsoftheEventcont'dDO(XETNIGER250-315.YEAR97LERNIGER6SEQUENTIAL 006REVISION01PAGE37OF10ReactorVesselHeadVentValveTheCookNuclearPlanthastwoheadventvalves,onlyoneofwhichisrequiredbythetechnical specifications tobeoperable.
Onlyoneoftheheadventvalveswasimpactedbyacrackedflooduptube.Thereactorvesselheadventsystem(1-NSO-021) isaseries/parallel arrangement wherefourvalvesaresuppliedbytwoseparatepowertrains.Anidentical arrangement existsforthepressurizer headvent.NocreditistakenforthereactorheadventsintheFSARdesignbasisaccidentanalysis.
Theyarestrictlyacontingency tobeusedforsevereaccidents.
Thereactorheadventswereinstalled intheCookNuclearPlantinresponseto10CFR50.44 (c)(3)(iii) toventahydrogenbubbleinthereactorheadintheeventofadegradedcoreaccidentwithsignificant hydrogengeneration.
ThisheadventisalsousedintheEmergency Operating Procedures toaidinvesseldepressurization afterallothermechanisms havefailed,including boththeprimaryandsecondary poweroperatedreliefvalves.ColdLetoHotLeIn'ection ValvesValves1-IMO-315, 1-IMO-316 and1-IMO-325 arerequiredtofunctionwhenswitching fromcoldlegtohotleginjection following alossofcoolantaccident.
Valves1-IMO-315 and1-IMO-325 arerequiredtoopentoprovideahotlegflowpathtoloops1,2,3,and4.Valve1-IMO-316 isrequiredtoclosetoblockthecoldlegflowpathtoloops1and4.Usingthecurrentlicensedmethodology, theinability toswitchtohotlegrecirculation wouldresultinboronprecipitation inthecoreandpossibleheattransferdegradation, potentially leadingtoacladdingtemperature heatup.However,Westinghouse hasdeveloped anewmethodology which,iflicensedandimplemented, wouldeliminate theneedtoswitchtohotlegrecirculation.
Thismethodology modelstheflowthroughthegapbetweenthehotlegnozzleandthebarrelasamechanism fortransporting boratedvesselwatertothesump.TheWestinghouse WCAPpresentsthemethodology anddocuments agenericanalysisthatisapplicable tomostWestinghouse 3and4loopplant,including Cook.Amongtheconclusions drawnfromthegenericanalysisisthattheECCSdoesnotneedtobealignedtotheRCShotlegspost-LOCA inordertolimitthebuildupofboron.Assuch,thehotIegnozzlegapwouldhavelimitedthebuildupofboronaftertheLOCA,eveniftheECCScouldnothavealignedtothehotlegs.Thiswouldhaveprevented boronprecipitation inthecore,maintaining theheattransfercapability
.Thustheinability toaligntheECCStothehotlegswouldnothaveresultedinaviolation ofanyofthe10CFR50.46criteria.
Power0cratedReliefValveBlockValve1-NMO-151 isanormallyopenblockvalveforapressurizer poweroperatedreliefvalve(PORV),andistheonlyoneofthethreePORVblockvalvesthatwasimpactedbyacrackedflooduptube.TheCookNuclearPlantpressurizer hasthreePORVswhichlimitreactorcoolantsystempressure.
ThePORVs,whicharespringclosedandair-openuponactuation oftheirassociated solenoidvalve,operateautomatically orbyremotemanualcontrol.RemotelyoperatedblockvalvesareprovidedtoisolatethePORVs.  


MRCFORH366A.SNUCLEARREGULATORY COXRISSIOH LICENSEEEVEBFZCONTINUATION BYORBMO.3150-0104 EXPIRES5/31/95ESTIHATED BURDENPERRESPOHSETOCOMPLYNITHTHISINFORHATION COLLECTIONRFCUEST:50.0'RS.FCRllARDCOHHENTSREGARDING BURDENESTIHATETOTHEIHFORHATIOH AHDRECORDS'HANAGEHENT BRANCH'HHBB 7714),U.S.NUCLEARREGULATORY COHHISSIOH, NASNIHGTON, DC20555-0001, AHDTOTHEPAPERHORX REDUCTION PROJECT(3150-0104),
HRC FORN  366A                                        .S. NUCLEAR REGUULTORY COXNISSIOM              ROVED BY ONB NO. 3150-01,04 EXPIRES 5/31/95 ESTINATED BURDEN PER RESPOHSE TO'COHPLY MITH THIS IHFORHATIOH COLLECTIOH REQUEST: 50.0 NRS; LICENSEE LWENT CONTINUATION                                          FORNARD CONHEHTS REGARDING BURDEN ESTINATE TO THE INFORNATION AND RECORDS NANAGEHEHT BRANCH (NHBB 7714), U.S. NUCLEAR REGULATORY COHHISSION, IIASHIHGTON, DC 20555-0001, AHD TO THE PAPERHORK REDUCTION PROJECT (3150-0104), OFFICE OF HANAGEHEHT AND BUDGET MASHINGTOH DC 20503.
OFFICEOFHANAGEHENT ANDBUDGETMASHIHGTOH DC20503.FACILITYMARECookNuclearPlant-Unit1TEXTOfcorespacefsrequired.
FACILITY MANE      1                        DOCKET NU)IBER  2          LER  NIGER  6                  PAGE  3 YEAR    SEQUENTIAL    REVI SICH Cook Nuclear Plant- Unit1                                                  50-315          97                      01 4 OF 10 TEXT (if sore space  is required. use additional HRC Fore 366A's) (17)
useadditional HRCFona366A's)(17)AnalsisoftheEventcont'dDOCKETNUMBER250-315YEAR97LERNUMBER6SEOUEHTIAL REVISIGH01PAGE3SOP10Power0cratedReliefValveBlockcont'dToevaluatetheimpactofthecrackedflooduptubes,fourconditions wereconsidered:
Cause of the Event cont'd An examination of two cracked tubes which had this second type of failure was performed by DCCNP metallurgical engineers . A portion of their investigation follows:
1)FSARaccidents; 2)highenergylinebreaksinsidecontainment whereimmediate isolation ofthePORVisrequired; 3)conditions outsideofthenormalFSARanalysiswhereitmaybenecessary toisolatethePORVaftertheelectricwirehousedinthecrackedPORVhasbeensubmerged forseveralhours,and4)conditions outsidetheFSARanalysiswhereitmaybenecessary toopenanisolatedPORVaftertheelectricwirehousedlnthecrackedPORVhasbeensubmerged forseveralhours.Eachoftheseconditions isdiscussed below.ThesingleChapter14accidentanalysiswhichrequiresPORVoperability isthesteamgenerator tuberupture(SGTR)withalossofoffsitepower.Inthisevent,onePORVisrequiredtoreduceprimarysystempressureduringtherecoveryphaseoftheaccidenttoslightlyabovethesecondary sidepressure.
          "An examination of two typically cracked tubes revealed a 3/4" long linear indication oriented parallel to the corrugation at the root of a convolution. The crack was located a distance of two convolutions from the weld attaching the bellows to the threaded fitting. One end of the crack, had a Y-pattern crack that is indicative of a crack initiation point due to excessive bending stress in the thin material. Due to the crack's location, the defect is not welding related.
AsecondPORVisrequiredtobeoperableforsinglefailureconsiderations.
Although not used in this application, the corrugated bellows is capable of withstanding motion, lateral offset, angular rotation, as well as axial extension and compression over the entire length of the floodup tube.
TheUFSARChapter14SGTRisnotconsidered tobeafloodingevent,andtherefore thecrackedflooduptubeswouldnothaveimpactedthePORVblockvalveoperability forthisaccident.
However, within a localized region, such as where the bellows are attached to the threaded fitting, the bellows transitions from flexible to rigid. At this location, the thin bellows material will not withstand any bending or torsional rotation loading."
fCreditistakenintheplantemergency operating procedures forthePORVstorecoverfromavarietyofaccidents.
The floodup tube installation in the annulus was reviewed to determine which configuration was more prone to failure. It was found that all those floodup tubes that have this type of defect were in those installations where there is a minimum of seven tubes per penetration. This is attributed to the fact that those penetration" installations with more floodup tubes also have more stringent bending restrictions due to space restrictions.
Thiswouldincludethecategoryofeventsandaccidents thatcc"dcausethePORVstoopenandfailtoclose,resulting inasmallbreakLOCA(e.g.normalplantcooldown, activation ofthesafetyinjection system,orseveretransients suchasafeedwater linebr'eakorsteamlinebreakinsidecontainment).
The fact that all these cracks were near the fitting end of the floodup tube and in those installations which require smaller bending radii confirm that the cracks were due to localized stress. Due to the type, location, orientation of the defect and lack of loading during service, these defects were most probably initiated in the bellows during installation or subsequent rework.
ThemainfunctionofthePORVblockvalvesistoisolateaPORVifthePORVfailsintheopenposition.
Anal sis of the Event These events are reportable under the provisions of 10CFR50.73(a)(2)()l. (8), operation prohibited by the plant's technical specifications, 10CFR50.73(a)(2)(ii), any event or condition that resulted in the condition of the nuclear power plant, including its principal safety barriers, being seriously degraded, and 10CFR50.73(a)(2)(ii)(B), a condition which is outside of the design basis of the plant.
Foreventsofthetypecitedabove,eithertheydonotcausecontainment
The cables are required to be environmentally qualified per 10CFR50.49. However, the environmental qualification testing did not include submerging the cable in water. Partial test data for Kapton insulated cable shows that one test sample failed after two hours, and a second test sample failed after forty eight hours. On this basis, it was determined that Kapton insulated cable was not suitable for long term use submerged in a sump solution having a pH of 9-10.
: flooding, oriftheydocauseflooding, theneedtoclosethePORVsoccursearlyenoughinthetransient thattheblockvalveswouldstillbeconsidered operableinspiteofthewaterintrusion thatmayhaveoccurredduetocracksintheflooduptubes.Athirdcategoryofeventsincludelongtermrecoveryactionssuchasresponsetoinadequate corecoolingorresponsetodegradedcorecoolingwherethecontainment couldbeflooded.EachoftheseeventsrequirethatastuckopenPORVbeisolated.
 
Theseeventsarebeyondthoseconsidered intheplantdesignbasis,anditisconsidered highlyunlikelythatanadverseaccidentofthistypecouldoccuratthesametimethataPORVsticksopen,thecablesaresubmerged, andtheblockvalvefailstoclosewhenitisrequired.
iiRC FORH 366A                                          U.S. NUCLEAR REGULATORY COO)I SSION            APPROVED BY O)IB NO. 3150-0104 EXP I RES 5i31/95 ESTINATEO BURDEN PER RESPONSE TO COHPLY MITH THIS lNFORHATION COLLECTION REaUESTs 50.0. HRS.
ThefinalcategoryiseventsthatrequireaPORVtobeopentofacilitate accidentrecovery.
LICENSEE EVENT CONTINUATION                                            FORMARO COHHENTS REGARDIHG'BURDEN ESTIHATE    TO'HE INFORNATION AND RECORDS HANAGEHENT BRANCH (HNBB 7714), U.S. NUCLEAR REGULATORY COHHISSIONg MASHINGTOH, DC 20555.0001, AND TO THE PAPERMORK REDUCTION PROJECT (3150-0104) ~ OFFICE OF HANAGEXENT AND BUDGET    MASHINGTON  DC 20503.
Anexampleofthiswouldbethefeedwater linebreakrecovery.
FACILITY NAKE      1                        DOCKET aRJÃBER  2            LER NURSER    6              PAGE  3 YEAR      SEOUENTIAL      REVISION Cook Nuclear Plant - Unit 1                                                  50-315          97                          01 5 OF 10 TEXT  (if cere space  is required, use additional HRC Fora 366A's) (17)
However,notallofthethreePORVswouldhavebeenaffectedbycracksintheflooduptubes,andatleastonewouldbeavailable forthispurpose.Thismeetstheminimumrequirement.
Anal sis of the Event cont'd Because the cracks in fioodup tubes are located below the containment floodup level, water, could enter the tube and the cable would be submerged in a sodium hydroxide solution having a pH of 9 to 10. Submergence in this                                  .
NRCFORM366A.S.NUCLEARREGULATORY COMMISSION LICENSEEEVENTCONTINUATION ROVEDBYOMBHO.3150-0104 EXPIRES5/31/95ESTIMATED BURDENPERRESPONSETOCOMPLYNITHTHISIHFORMATION COLLECTIOH REQUEST:50.0HRS;.,FORIIARDCOMMENTSREGARDING BURDENESTIMATETO'HEINFORMATION ANDRECORDSMANAGEMENT BRANCH(MHBB7714),U.S.NUCLEARREGULATORY COMMISSION;
solution would degrade the Kapton insulation, and it would eventually fail. As the time to failure. cannot be accurately predicted, any equipment required for Iong term accident mitigation was considered to be inoperable.
'WASHINGTON, DC20555-0001, ANDTOTHEPAPERNORK REDUCTION PROJECT(3150.0104),
Equipment which could complete its safety function within two hours following the accident was considered operable for the purpose of the analysis presented in this LER.
OFFICEOFMANAGEMENT ANDBUDGET'NASHIHGTON DC20503.FACILITYNAME1CookNuclearPlant-Unit1TEXT(ifaorespaceisrequired.
i lt is not possible to tell when the tubes became cracked. However, the apparent cause of the cracks, welding arc strikes and stress cracking, indicates that they existed prior to discovery. Therefore, it is assumed that the unit was in T/S 3.0.3, which is reportable as a condition which is outside the design basis of the plant and as operation prohibited by the plant's technical specifications.
useaddit(onal NRCFora366A's)(17)AnalslsoftheEventcont'dDOCKETNU)IER250-315LERNUMBER6YEARSEQUENTIAL 97-006REVISIOH01PAGE39OF10Unit2Containment AirRecirculation/H droenSkimmerFanTheCookNuclearPlanthastwocontainment airrecirculation/hydrogen skimmer(CEQfans),onlyoneofwhichisrequiredforaccidentmitigation.
The result of the evaluation is that, although the potential for equipment failure placed the plant outside of its licensing basis in many instances, there was no postulated failure that is considered to have a major impact with regard to protecting the public health and safety. Also, in many cases the equipment was backed up by unaffected redundant equipment and/or equipment which co'uld perform a similar safety function.
Onlyonefanwasadversely impactedbyacrackedflooduptube.TheCEQfansarerequiredtoprovideacontinuous mixingofthecontainment atmosphere forthelongtermpostblowdownaccidentenvironment.
Unit 1 Narrow Ran e Steam Generator Level Transmitters The narrow range steam generator level transmitters (1-BLP-132, -142) provide a signal to the reactor protection system, and they are used for post accident monitoring of the steam generator level (Technical specification 3.3.3.8 requires one operable channel per steam generator). The protection system function would be accomplished prior to the cable's becoming submerged. There are three narrow range steam generator level transmitters per steam generator, and the post accident monitoring function could be accomplished by either the remaining two narrow range transmitters.
Theyarealsorequiredtopreventtheformation ofhydrogenpocketswithinthevariouscompartments andsubcompartments oftheicecondenser containment.
Hot Le Wide Ran e Tem erature Recorder I
Twofullcapacityfans,eachcapableofblowingairfromtheuppervolumeintothelowervolumeareprovided.
The hot leg wide range temperature recorder (1-NTR-140, -240) signal is required as input to the RCS subcooling monitor, and the subcooling monitoring system would be less effective since input temperatures from an entire RCS loop would be lost.
Foraccidentanalysisconditions, onlyonefanismodeledbaseduponthelimitingsinglefailureofatrainofcontainment safeguards equipment.
The operator also has available subcooling indication using the core exit thermocouples. This is actually the preferred method of determining subcooling since it provides conservative results. Thus the loss of 1-NTR-140 and 1-NTR-240 would not have significantly impacted plant operations and is judged to have had no adverse impact on public health and safety.
Theairrecirculation fanshavesufficient headtoovercomethecompartment pressuredifferentials thatoccuraftertheinitialRCSblowdown.
 
Thefanswillblowairfromtheuppercompartment tothelowercompartment therebyretumlngairtothelowercompartment whichwasdisplaced bytheblowdown.
MRC FORM  366A                                          S. N)CLEAR    REGULATORY COMMISSION                        (NB MO- 3150-0104 EXPIRES  5/3'I/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS.
Althoughthefansaremodeledduringboththecontainment responsetransient following aLOCAandMSLB,thegreatestimpactresulting fromtheiractivation isseenduringtheLOCAtransient responseduetothelongtermtransient scenario.
LICENSEE 'TTENT CONTlNUATION                                            FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE INFORMATION ANO RECORDS MANAGEMEHT BRANCH (MNBB 7714), U.S. NUCLEAR REGULATORY COMHISSIOH ~
Theairreturnfansaremodeledtooperateuponreachingthehigh-high containment pressuresetpointfollowing atenminutedelay.DuringtheLOCAresponsetransient thefansprovideaflowpathearlyinthetransient, therefore theirfunctionplaysanimportant role(beforethetimeofpeakpressure) inthecontainment responsecalculation.
WASHINGTON, OC 20555-0001, ANO TO THE PAPERWORK REDUCTION PROJECT (3150 0104)g OFFICE OF MANAGEMENT AND BUDGET  WASHINGTON  DC 20503.
Similarly duringtheMSLBcontainment responsecalculation thefansfunctioninalikewisemanner.However,thetimethefansactivatefollowthetimewhenthecontainment peakpressureandtemperature occurs,therefore theirimpactonthecontainment responsetransient isminimal.Theirprimaryeffectisontherateofcontainment depressurization andcooldownafter10minutesintotheMSLBcontainment responsetransient.
FACILITY NAME                                                                LER MINBER  6                PAGE 3 SEQUENTIAL    REVISION Cook Nuclear Plant- Unit 1                                                    50-315          97                      01 6 OF 10 TEXT itf Nore space  is required. use additional MIC Fons 3664's) (I7)
Baseduponsensitivities whichhavebeenperformed foranicecondenser plantsimilartotheCookNuclearPlantwhenconsidering inoperable airreturnfans,theeffectofthelossoftheairreturnfanoncontainment peakpressurewas5psi.SincetheCookdesignpressureis12psi,thismeansthatthemaximumpressureachievedbythecontainment shouldbothfansbelostis17psi.Althoughabovetheplantdesignbasisof12psi,thisiswellwithinthecontainment ultimatecapability ofapproximately 36psi.Thepotential lossofCEQfansalsomeansthelossofabilitytoremovehydrogenfromthecompartments oftheCookNuclearPlant.Thiswillnotoccuruntiltwohoursintotheaccident.
  , Anal sls of the Event cont'd H dro en Recombiner The Cook Nuclear Plant has two hydrogen recombiners of which only one is required for accident mitigation.
AspartoftheCookNuclearPlant'sprobabilistic riskassessment, studieshavebeenperformed toevaluatethelossofCEQfansfollowing asevereaccident.
Only one of the two recombiners (1-HR-1) was adversely impacted by a cracked floodup tube.
Thesestudieshaveconcluded thatnoadverseimpactoncontainment performance isexpectedduetocontainment recirculation fanfailures.
The hydrogen recombiner is used to maintain the long-term hydrogen concentration inside containment below 4 volume per cent. Although the principal means of hydrogen control that is included fn the plant design basis are two electric hydrogen recombiners combined with two containment air recirculation fans, additional means of hydrogen control, hydrogen igniters, were added to address the possibility of excessive hydrogen concentrations that may exist following a severe accident. An analysis has been performed to show that the igniters are capable of preventing hydrogen ignition from endangering the public health and safety when hydrogen concentrations are excessively high. Therefore, in the event that both recombiners were to fail, and the hydrogen concentrations were to build up to excessive amounts, it is believed that the hydrogen igniters would prevent the ensuing problems with hydrogen ignition from adversely impacting public health and safety.
Onthebasisoftheabove,itisconcluded thatthelossofoneCEQfandidnotadversely impactthepublichealthandsafety.Itisfurtherpointedout,thatonlyoneofthetworedundant fanswasimpacted, andtherefore following ahighenergylinebreakinsidecontainment theplantmayhavestayedwithitsdesignbasiscontainment pressureof12psi.
Although the igniters do not have the data to support longevity of operation, they are capable of supporting operation for at least one week. It is believed that the igniters would last for periods considerable beyond that time. During the time that there was total reliance on the hydrogen igniters, it may be possible to repair the unaffected electric hydrogen recombiner (if the repair could be performed outside the containment) or establish some other means of long term hydrogen control, if it were necessary.
NRCFORH366A.S.NUCLEARREGULATORY COXHISSICILICENSEEEVENTCONTINUATION BY'ORBNO.3150-0104 EXPIRES5/31/95ESTIHATED BURDENPER-RESPONSE TOCOHPLYWITHTHISINFORHATION.COLLECTION'REQUEST:
Based on the combination of the unlikelihood of failure of the redundant hydrogen recombiner, combined with the availability of the hydrogen igniters, it is concluded that there would be an almost negligible chance that the cracks in the fioodup tubes servicing electrical cables to 1-HR-1 would have resulted in significant problems associated with hydrogen ignition should a design basis LOCA have occurred at the plant. It is therefore concluded that the crack in the floodup tube associated with 1-HR-1 did not represent a significant hazard with regard to the protection of the public health and safety.
50.0NRS'.FORIIARDCOHHENTSREGARDING BURDENESTIHATETOTHEINFORHATION ANDRECORDSHANAGEHENT BRANCH(HNBB7714),U.S.NUCLEARREGULATORY COHHISSION, MASNINGTON, DC20555-0001, ANDTOTHEPAPERNORK REDUCTION PROJECT(3150-0104),
Containment Recirculation Fan Valve The Cook Nuclear Plant has two recirculation fans, only one of which is required for accident mitigation.
OFFICEOF"HANAGEHENT ANDBUDGETMASNINGTON DC20503.FACILITYNAHE1CookNuclearPlant-Unit1TEXT((fmorespaceisrequired.
Only one of the recirculation fans was impacted by the cracked floodup tube containing the cable associated with valve 1-VMO-102.
useadditional NCForm36EA's)(17)Corrective ActionDOIETNUNBER25015YEAR97LERNUNBER6SEQUENTIAL REVISION01PAGE310OF10Criticalareasforallflooduptubesineachunithavebeeninspected forcracks.ThedamagedUnit1EQfiooduptubesandUnit2flooduptubeshavebeenreplaced.
The containment air recirculation system valve is activated 10 minutes after the accident occurs. Based on partial test data which demonstrate that a minimum of two hours is required before Kapton insulation is degraded to the point where it is no longer effective, it is concluded that this valve would have performed its function prior to the insulation's being significantly degraded.
Preventive ActionAdequateprecautions forweldinginthevicinityofelectrical equipment havebeenidentified intheAEPWeldingManual,GeneralWeldingRequirements, step6.13whichincondensed versionstates:basematerials andothermetallicregionsoutsideoftheweldzoneshallbeprotected topreventinadvertent arcstrikes.Inaddition, PMI-2270(FIREPROTECTION),
 
containstheWelding,Burning,8GrindingPermitwhichisissuedforallweldingactivities.
MRC FORM  366A                                          S  N)CI.EAR REGULATORY COOII SS I ON                    BY (NB MO. 3150-0104 EXPIRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY MITH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS.
Thepermitcoversarearequirements whichprovidedirection tocoverelectrical equipment aridcabletrayswithfireblanket.Tosupplement theseplantrequirements, aninspection asstatedbelowwillbeperformed toverifythatthetubeshavenotbeendamagedpriortostart-upafteroutageworkhasbeenperformed.
LICENSEE EVENT CONTINUATION                                                FORNARD COMMENTS REGARDING BURDEN ESTIMATE TO THE INFORMATION AHD RECORDS MANAGEMEHT BRANCH (MHBB 7714), U.S. NUCLEAR REGULATORY COMMISSION/
WorkStandards totheNuclearPlantMaintenance (NPM)andEnvironmental Qualification Preservation Documents (EQPD)willbeenhancedtoidentifythatwhileworkingontheflooduptubesthereisaneedtoavoidaddingunduelocalized stresstotheflooduptubesandthentoverifythatnocrackshavedeveloped
MASHIHGTOH, DC 20555-0001, AND TO THE PAPERNORK REDUCTION PROJECT (3150-0104), OFFICE OF MANAGEMENT AND BUDGET llASHIHGTOH DC'20503.
.TheWorkStandards totheNPMforflooduptubeinstallation havealreadybeenrevisedtoincludetheseprecautions.
FACILITY MANE      1                          DO(XET NIGER    2            LER NIGER 6                PAGE  3 YEAR    SEQUENTIAL    REVISION Cook Nuclear Plant - Unit 1                                                  50-315  .
Asalongtermaction,newEQPDwillbeissuedbyJune1,1998forflooduptubestoidentifythecriticalEQparameters.
97        006          01 7 OF 10 TEXT (if sere space  is required. use additional NRC Fons  36Q's) (17)
Inspections willbemadeatthebeginning ofeachoutagetocheckforanycracks.Inspections willalsobemadeattheendoftheoutagetoensurethatnooutageactivities damagedanytubes.Inaddition, althoughnotcontained inaformalprogram,theknowledge thatthetubesaresubjecttothistypeofdamagewillheightenawareness andimproveworkbeingdoneonandaroundtheflooduptubes.FailedComonentIdentification NotApplicable PreviousSimilarEventsNone}}
Anal sls of the Event cont'd Reactor Vessel Head Vent Valve The Cook Nuclear Plant has two head vent valves, only one of which is required by the technical specifications to be operable. Only one of the head vent valves was impacted by a cracked floodup tube.
The reactor vessel head vent system (1-NSO-021) is a series/parallel arrangement where four valves are supplied by two separate power trains. An identical arrangement exists for the pressurizer head vent.
No credit is taken for the reactor head vents in the FSAR design basis accident analysis. They are strictly a contingency to be used for severe accidents. The reactor head vents were installed in the Cook Nuclear Plant in response to 10CFR50.44 (c)(3)(iii) to vent a hydrogen bubble in the reactor head in the event of a degraded core accident with significant hydrogen generation. This head vent is also used in the Emergency Operating Procedures to aid in vessel depressurization after all other mechanisms have failed, including both the primary and secondary power operated relief valves.
Cold Le to Hot Le In'ection Valves Valves 1-IMO-315, 1-IMO-316 and 1-IMO-325 are required to function when switching from cold leg to hot leg injection following a loss of coolant accident. Valves 1-IMO-315 and 1-IMO-325 are required to open to provide a hot leg flowpath to loops 1,2,3, and 4. Valve 1-IMO-316 is required to close to block the cold leg flowpath to loops 1 and 4.
Using the current licensed methodology, the inability to switch to hot leg recirculation would result in boron precipitation in the core and possible heat transfer degradation, potentially leading to a cladding temperature heatup. However, Westinghouse has developed a new methodology which, if licensed and implemented, would eliminate the need to switch to hot leg recirculation. This methodology models the flow through the gap between the hot leg nozzle and the barrel as a mechanism for transporting borated vessel water to the sump. The Westinghouse WCAP presents the methodology and documents a generic analysis that is applicable to most Westinghouse 3 and 4 loop plant, including Cook. Among the conclusions drawn from the generic analysis is that the ECCS does not need to be aligned to the RCS hot legs post-LOCA in order to limit the buildup of boron. As such, the hot Ieg nozzle gap would have limited the buildup of boron after the LOCA, even if the ECCS could not have aligned to the hot legs. This would have prevented boron precipitation in the core, maintaining the heat transfer capability . Thus the inability to align the ECCS to the hot legs would not have resulted in a violation of any of the 10 CFR 50.46 criteria.
Power    0  crated Relief Valve Block Valve 1-NMO-151 is a normally open block valve for a pressurizer power operated relief valve (PORV), and is the only one of the three PORV block valves that was impacted by a cracked floodup tube.
The Cook Nuclear Plant pressurizer has three PORVs which limit reactor coolant system pressure. The PORVs, which are spring closed and air-open upon actuation of their associated solenoid valve, operate automatically or by remote manual control. Remotely operated block valves are provided to isolate the PORVs.
 
MRC FORH  366A                                        .S  NUCLEAR REGULATORY COXRISSIOH                     BY ORB MO. 3150-0104 EXPIRES 5/31/95 ESTIHATED BURDEN PER RESPOHSE TO COMPLY NITH THIS INFORHATION COLLECT ION RFCUEST: 50.0'RS.
LICENSEE EVEBFZ CONTINUATION                                          FCRllARD COHHENTS REGARDING BURDEN ESTIHATE TO THE IHFORHATIOH AHD RECORDS'HANAGEHENT   BRANCH'HHBB 7714), U.S. NUCLEAR REGULATORY COHHISSIOH, NASNIHGTON, DC 20555-0001, AHD TO THE PAPERHORX REDUCTION PROJECT (3150-0104), OFFICE OF HANAGEHENT AND BUDGET  MASHIHGTOH    DC 20503.
FACILITY MARE                                DOCKET NUMBER  2            LER NUMBER  6                PAGE          3 YEAR      SEOUEHTIAL    REVI SIGH Cook Nuclear Plant - Unit 1                                                50-315          97                        01 SOP 10 TEXT Of core space  fs required. use additional HRC Fona 366A's) (17)
Anal sis of the Event cont'd Power    0  crated Relief Valve Block cont'd To evaluate the impact of the cracked floodup tubes, four conditions were considered: 1) FSAR accidents;
: 2) high energy line breaks inside containment where immediate isolation of the PORV is required; 3) conditions outside of the normal FSAR analysis where it may be necessary to isolate the PORV after the electric wire housed in the cracked PORV has been submerged for several hours, and 4) conditions outside the FSAR analysis where it may be necessary to open an isolated PORV after the electric wire housed ln the cracked PORV has been submerged for several hours. Each of these conditions is discussed below.
The single Chapter 14 accident analysis which requires PORV operability is the steam generator tube rupture (SGTR) with a loss of offsite power. In this event, one PORV is required to reduce primary system pressure during the recovery phase of the accident to slightly above the secondary side pressure. A second PORV is required to be operable for single failure considerations. The UFSAR Chapter 14 SGTR is not considered to be a flooding event, and therefore the cracked floodup tubes would not have impacted the PORV block valve operability for this accident.
f Credit is taken in the plant emergency operating procedures for the PORVs to recover from a variety of accidents. This would include the category of events and accidents that cc"d cause the PORVs to open and fail to close, resulting in a small break LOCA (e.g. normal plant cooldown, activation of the safety injection system, or severe transients such as a feedwater line br'eak or steam line break inside containment). The main function of the PORV block valves is to isolate a PORV if the PORV fails in the open position. For events of the type cited above, either they do not cause containment flooding, or if they do cause flooding, the need to close the PORVs occurs early enough in the transient that the block valves would still be considered operable in spite of the water intrusion that may have occurred due to cracks in the floodup tubes.
A third category of events include long term recovery actions such as response to inadequate core cooling or response to degraded core cooling where the containment could be flooded. Each of these events require that a stuck open PORV be isolated. These events are beyond those considered in the plant design basis, and it is considered highly unlikely that an adverse accident of this type could occur at the same time that a PORV sticks open, the cables are submerged, and the block valve fails to close when it is required.
The final category is events that require a PORV to be open to facilitate accident recovery. An example of this would be the feedwater line break recovery. However, not all of the three PORVs would have been affected by cracks in the floodup tubes, and at least one would be available for this purpose. This meets the minimum requirement.
 
NRC FORM  366A                                        .S. NUCLEAR REGULATORY COMMISSION               ROVED BY OMB HO. 3150-0104 EXPIRES  5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY NITH THIS IHFORMATION COLLECTIOH REQUEST: 50.0 HRS;.,
LICENSEE EVENT CONTINUATION                                            FORIIARD COMMENTS REGARDING BURDEN ESTIMATE TO INFORMATION AND RECORDS MANAGEMENT BRANCH
                                                                                                                                          'HE (MHBB 7714), U.S. NUCLEAR REGULATORY COMMISSION;
                                                                                          'WASHINGTON, DC 20555-0001, AND TO THE PAPERNORK REDUCTION PROJECT (3150.0104), OFFICE OF MANAGEMENT AND BUDGET 'NASHIHGTON DC 20503.
FACILITY NAME      1                        DOCKET NU)IER  2              LER NUMBER  6                PAGE  3 YEAR      SEQUENTIAL    REVISIOH Cook Nuclear Plant - Unit 1                                                50-315          97        006            01 9 OF 10 TEXT (if aore space  is required. use addit(onal NRC Fora 366A's) (17)
Anal sls of the Event cont'd Unit 2 Containment Air Recirculation/H dro en Skimmer Fan The Cook Nuclear Plant has two containment air recirculation/hydrogen skimmer (CEQ fans), only one of which is required for accident mitigation. Only one fan was adversely impacted by a cracked floodup tube.
The CEQ fans are required to provide a continuous mixing of the containment atmosphere for the long term post blowdown accident environment. They are also required to prevent the formation of hydrogen pockets within the various compartments and subcompartments of the ice condenser containment.
Two full capacity fans, each capable of blowing air from the upper volume into the lower volume are provided. For accident analysis conditions, only one fan is modeled based upon the limiting single failure of a train of containment safeguards equipment. The air recirculation fans have sufficient head to overcome the compartment pressure differentials that occur after the initial RCS blowdown. The fans will blow air from the upper compartment to the lower compartment thereby retumlng air to the lower compartment which was displaced by the blowdown. Although the fans are modeled during both the containment response transient following a LOCA and MSLB, the greatest impact resulting from their activation is seen during the LOCA transient response due to the long term transient scenario. The air return fans are modeled to operate upon reaching the high-high containment pressure setpoint following a ten minute delay. During the LOCA response transient the fans provide a flow path early in the transient, therefore their function plays an important role (before the time of peak pressure) in the containment response calculation. Similarly during the MSLB containment response calculation the fans function in a likewise manner. However, the time the fans activate follow the time when the containment peak pressure and temperature occurs, therefore their impact on the containment response transient is minimal. Their primary effect is on the rate of containment depressurization and cooldown after 10 minutes into the MSLB containment response transient.
Based upon sensitivities which have been performed for an ice condenser plant similar to the Cook Nuclear Plant when considering inoperable air return fans, the effect of the loss of the air return fan on containment peak pressure was 5 psi. Since the Cook design pressure is 12 psi, this means that the maximum pressure achieved by the containment should both fans be lost is 17 psi. Although above the plant design basis of 12 psi, this is well within the containment ultimate capability of approximately 36 psi.
The potential loss of CEQ fans also means the loss of ability to remove hydrogen from the compartments of the Cook Nuclear Plant. This will not occur until two hours into the accident. As part of the Cook Nuclear Plant's probabilistic risk assessment, studies have been performed to evaluate the loss of CEQ fans following a severe accident. These studies have concluded that no adverse impact on containment performance is expected due to containment recirculation fan failures.
On the basis of the above, it is concluded that the loss of one CEQ fan did not adversely impact the public health and safety. It is further pointed out, that only one of the two redundant fans was impacted, and therefore following a high energy line break inside containment the plant may have stayed with its design basis containment pressure of 12 psi.
 
NRC FORH  366A                                          .S. NUCLEAR REGULATORY COXHI SSICI                    BY'ORB NO. 3150-0104 EXPIRES 5/31/95 ESTIHATED BURDEN PER-RESPONSE TO COHPLY WITH LICENSEE EVENT CONTINUATION                                            THIS INFORHATION.COLLECTION'REQUEST: 50.0 NRS'.
FORIIARD COHHENTS REGARDING BURDEN ESTIHATE TO THE INFORHATION AND RECORDS HANAGEHENT BRANCH (HNBB 7714), U.S. NUCLEAR REGULATORY COHHISSION, MASNINGTON, DC 20555-0001, AND TO THE PAPERNORK REDUCTION PROJECT (3150-0104), OFFICE OF" HANAGEHENT AND BUDGET  MASNINGTON  DC  20503.
FACILITY NAHE        1                        DOIET  NUNBER  2            LER NUNBER  6                PAGE  3 YEAR      SEQUENTIAL    REVISION Cook Nuclear Plant - Unit 1                                                  5015            97                      01        10 OF 10 TEXT  ((f more space  is required. use additional NC Form 36EA's) (17)
Corrective Action Critical areas for all floodup tubes in each unit have been inspected for cracks.
The damaged Unit            1  EQ fioodup tubes and Unit 2 floodup tubes have been replaced.
Preventive Action Adequate precautions for welding in the vicinity of electrical equipment have been identified in the AEP Welding Manual, General Welding Requirements, step 6.13 which in condensed version states: base materials and other metallic regions outside of the weld zone shall be protected to prevent inadvertent arc strikes. In addition, PMI-2270 (FIRE PROTECTION), contains the Welding, Burning, 8 Grinding Permit which is issued for all welding activities. The permit covers area requirements which provide direction to cover electrical equipment arid cable trays with fire blanket. To supplement these plant requirements, an inspection as stated below will be performed to verify that the tubes have not been damaged prior to start-up after outage work has been performed.
Work Standards to the Nuclear Plant Maintenance (NPM) and Environmental Qualification Preservation Documents (EQPD) will be enhanced to identify that while working on the floodup tubes there is a need to avoid adding undue localized stress to the floodup tubes and then to verify that no cracks have developed . The Work Standards to the NPM for floodup tube installation have already been revised to include these precautions. As a long term action, new EQPD will be issued by June 1, 1998 for floodup tubes to identify the critical EQ parameters.
Inspections will be made at the beginning of each outage to check for any cracks. Inspections will also be made at the end of the outage to ensure that no outage activities damaged any tubes.
In addition, although not contained in a formal program, the knowledge that the tubes are subject to this type of damage will heighten awareness and improve work being done on and around the floodup tubes.
Failed Com onent Identification Not Applicable Previous Similar Events None}}

Latest revision as of 00:36, 4 February 2020

LER 97-006-01:on 970327,equipment in Containment Rendered Inoperable Due to Cracked Floodup Tubes Identified.Caused by Work Practices That Resulted in Two Separate Types of Failures.Critical Areas inspected.W/970530 Ltr
ML17334B632
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/30/1997
From: Blind A, Finissi M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-97-006, LER-97-6, NUDOCS 9706050294
Download: ML17334B632 (17)


Text

CATEGORY REGULATO INFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION NBR:9706050294 DOC.DATE: 97/05/30 NOTARIZED: NO DOCKET FACZL:50;315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AOTH.QAME 'UTHOR AFFILIATION t

FINZSSZ,M. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele BLIND,A.A. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

LER 97-006-01:on 970327,equipment in containment rendered inoperable due to cracked floodup tubes was identified.

Caused by work practices that resulted in two separate types of failures. Critical areas inspected.W/970530 ltr.

DISTRIBUTION CODE: .IE22T COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc. E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-3 PD 1 1 HICKMAN,J 1 1 INTERNAL: 2 2 AEOD/SPD/RRAB 1 1 FILE CENTER 1 1 NRR/DE/ECGB 1 1 1 1 NRR/DE/EMEB 1 1 NRR/DRCH/HHFB 1 1 NRR/DRCH/HICB 1 1 NRR/DRCH/HOLB NRR/DRPM/PECB NRR/DSSA/SRXB RGN3 FILE 01 1

1 1

1 1

1 1

1 NRR/DRCH/HQMB NRR/DSSA/SPLB RES/DET/EIB l,l 1

1 1

1 D

EXTERNAL: L ST LOBBY WARD 1 1 LITCO BRYCE,J H 1 1 NOAC POORE,W. 1 1 ~ NOAC QUEENER,DS 1 1 NRC PDR 1 1 NUDOCS FULL TXT 1 1 U

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTETH CONTACT THE DOCUMENT CONTROL DESKi ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES RF "ZRED: LTTR 24 ENC'4

Indiana Michigan I

Power Company Cook Nuclear Piani One Cook Place Bridgman, MI49106 May 30, 1997 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Operating Licenses DPR-58 Docket No. 50-315 Document Control Manager:

~lh In accordance with the criteria established by 10 CFR 50.73 entitled Licensee Event f I

'g p i big 1 iltd.'7-006-01 Sincerely, I (

A. A. Blind Site Vice President Imbd Attachment c: A. B. Beach, Region III E. E. Fitzpatrick P. A. Barrett S. J. Brewer J. R. Padgett D. Hahn Records Center, INPO NRC Resident Inspector 9706050294 970530 PDR ADQCK 050003i5 llllllllllllllllllllllliilllill flillli 8 PDR

NRC FORM 366 S. NUCLEAR REGUULTORY COMMISSION ROVED BY OHB NO. 3150-0104 (5-92) EXPIRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY lllTH THI INFORMATION'COLLECTIOM REQUEST: 50.0 MRS. - FORNAR LICENSEE EVIDENT REPORT (LER) COMMENTS REGARDIHG BURDEN ESTIMATE To TH INFORMATION AND RECORDS MANAGEMENT BRANCH (MMB 7714), U.ST NUCLEAR REGULATORY COMMISSION NASHIMGTON, DC 20555-0001, AND TO THE PAPERMOR REDUCTION PROJECT (3150.0104), OFFICE 0 MANAGEMENT AND BUDGET NASHINGTOH DC 20503.'ACILITY NAME (1), DOCKET NUMBER (2) Page 1 of 10 Oonald C. Cook Nuclear Plant - Unit 1 50.315 TITLE (4)

E ui mentinContainmentRenderedlno erableDuetoCrackedFloodu Tubes EVENT DATE 5 LER NUMBER 6 REPORT DATE 7 OTHER FACILITIES INVOLVED 8 SEQUENTIAL REVISION FACILITY NAME DOCKET NUHBER MONTH DAY YEAR YEAR MUHBER NUMBER MOHTH DAY YEAR Cook - Unit 2 50-316 FACILITY NAME DOCKET NUMBER 27 97 006 01 05 30 97 OPERATING THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF t0 CFR  : Check one or more tt MODE (9) 20.2201(b) 20.2203(a){3)(i) 50.73(a)(2){iii) 73.71 (b)

P(XJER 0

20.2203 a 1 20.2203 a 3 ii 50 73 a)(2 73.7to LEVEL (10) 20.2203(a)(2)(i) 20.2203(a)(4) iv'0.73(a)(2)(v)

OTHER 20.2203 a 2 ii 50.36 c 1 50.73 a 2 vii (Specify in 20.2203(a)(2)(iii) 50.36(c)(2) 50.73(a)(2)(viii)(A) Abstract betou and in Text, 20.2203(a)(2)(iv) 50.73(a)(2)(i) 50.73(a)(2)(viii)(B) NRC Form 366A)

?0.2203(a)(2)(v) 50.73(a)(2)(ii) 50.73(a)(2)(x)

LICENSEE CONTACT FOR THIS LER 12 NAME TELEPHONE NUMBER (Include Area Code)

Mr. Mike Finissi, System Engineering - Electrical Supervisor 616/465-5901, x2830 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT 13 REPORTABLE REPORTABLE CAUSE SYSTEM COMPOHEHT MANUFACTURER CAUSE SYSTEH COMPOHEHT MANUFACTURER TO NPRDS TO NPRDS SUPPLEMENTAL REPORT EXPECTED 14 EXPECTED MONTH DAY YEAR YES SUBMISSION (If yes, complete EXPECTED SUBMISSIOH DATE). X HO DATE (15)

ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typevritten tines) (16)

This LER revision is being submitted to provide additional information regarding the safety significance and the root cause determination for cracked iloodup tubes (FUTS) found in Cook Units 1 and 2.

During an inspection of fioodup tubes for moisture intrusion, 3 FUTS with thru wall defects were identified. As a result, pro-active measures were taken to inspect the remaining Unit 1 FUTS. This resulted ln the identification of six additional thru wall defects in Unit 1. As a result, Unit 2 FUTs were inspected, and 2 cracked tubes were found. Of the 11 total damaged tubes, Unit 1 contained 7 FUTS and Unit 2 contained 1 FUT with an associated circuit that is needed for acddent mitigation or post acddent monitoring. On March 23 the Unit 2 condition was reported under 10CFR50.72(b)(1)(ii). On March 27 Unit 1 condition was reported under 10CFR50.72(b)(2)g. ENS notifications were made for both.

The damage has been attributed to work practices that resulted in two different types of failures-material stress cracks and random arc strikes, most probably early in plant Ne. All damaged Unit 1 EQ FUTS have been replaced and both Unit 2 tubes have been replaced. To prevent the cracks due to installation practices from reoccurring, the Cook Plant FUT Installation Work Instructions will be modified to contain additional guidance. Welding practices have been suflidently enhanced since the early portion ofthe plantlife to predude are strikes onFUTS. Inspections of the FUTS for damage will also be performed at the beginning and the end of the refueling outages until assurance is reached that no further problems were found.

Postulated failures that could result from the cracked floodup tubes were evaluated and found not to present a significan risk with regard to the protection of the public health and safety.

NRC FORH 366A ~ S NUCLEAR REGULATORY C(mHI SS I ON tPPROVED BY OHB'O. 3150.0104 EXPIRES 5/31/95 ESTIHATED BURDEN PER RESPONSE TO COHPLY 'WITH LICENSEE &/ENT CONTINUATION THIS IHFORHATION COLLECTION REQUEST: 50.0 NRS.

COHHEHTS REGARDING BURDEN ESTIHATE TO 'ORNARD THE INFORHATION AND RECORDS HANAGEHENT'RANCH'HNBB 7714), U.S. NUCLEAR REGULATORY COHHISSION, NASHINGTON, DC 20555-0001, AND TO THE PAPERIJORi(

REDUCTION PROJECT (3150-0104) ~ OFFICE OF HANAGEHENT AND BUDGET MASNINGTON DC 20503.

FACILITY NAÃE 1 LER NUHBER 6 'PAGE 3

'EAR SEQUENTIAL REVISION Cook Nuclear Plant - Unit 1 50-315 97 006 2OF10 01 TEXT (if sere space is required. use additicnal iaC Fora 366A's) (17)

Conditions Prior to Occurrence Unit 1 was in Mode 6, Refueling Unit 2 was in Mode 1, Power Operation, at 100 percent Rated Thermal Power Descri tlon of Event Electrical penetrations at the D. C. Cook Nuclear plant are located below the predicted flooding level inside containment following a loss of coolant accident. As a result, safety related cables are routed through stainless steel tubes, known as floodup tubes, which prevent the water in the containment from contacting the cables. This precaution is necessary because the electrical cables have not been environmentally qua1ified for submergence in water. All Katpon wires below floodup levels needed for EQ are contained in a floodup tube. There is no other EQ equipment below floodup level which needs floodup tubes to maintain its qualification.

As a result of LER 316/96-006-00, which was written to document the discovery of moisture intrusion into FUTs during Unit 2's 1996 refueling outage, one third of Unit 1's FUTs were inspected for moisture intrusion during its 1997 refueling outage. During the floodup tube inspection, nine tubes in Unit 1 were found to have cracks which would allow water intrusion following a loss of coolant accident. As a result of the Unit 1 findings, the floodup tubes in Unit 2 were inspected, and two cracked tubes were discovered.

The cables that are contained inside the floodup tubes are Kapton insulated, and a review of partial test data for Kapton insulated wires in high pH solutions has led to the conclusion that cable failures may occur after tw'o hours of submergence in the high pH solution (9 to 10) that would flood the lower containment following a loss of coolant accident.

The Unit 1 tubes were inspected during the period March 16, 1997 through March 23, 1997. Following the inspection, the following equipment which is required for accident mitigation or post accident monitoring was identified as adversely impacted by the existence of a cracked fioodup tube:

1-8LP-1 32 Steam Generator three narrow range (EIIS/IP-LT) level transmitter 1-BLP-142 Steam Generator four narrow range (EIIS/IP-LT) level transmitter 1-NTR-140 Reactor coolant loop 4 hot leg wide (EIIS/TR) range temperature recorder thermal sensor 1-NTR-240 Reactor coolant loop 4 cold leg wide (EIIS/TR) range temperature recorder thermal sensor 1-HR-1 Hydrogen Recombiner (EIIS/BB-RCB) 1-VMO-1 02 Containment Hydrogen Skimmer (EIIS/BB-IV) ventilation fan HV-CEQ-2 suction shutoff valve

HRC FORH 366A .S. NUCLEAR REGULATORY COXHI SSIOH &PROVED BY QS'NO. 3150-0104 EXPIRES 5/31/95 ESTIHATED BURDEN PER RESPONSE'TO COHPLY MITH THIS INFORHATION COLLECTION REQUEST: 50.0 HRS.

LICENSEE ZWHNT CONTINUATION FORMARD COHHEHTS REGARDIHG BURDEN ESTIMATE TO THE IHFORHATIOH AHD RECORDS HANAGEHEHT. BRANCH (HHBB 7714), U.S. NUCLEAR REGULATORY COHHISSIOHg MASHINGTON, DC 20555-0001, AND -TO THE PAPERMORK REDUCTION PROJECt (3150-0104), OFFICE OF HANAGEHENT AND BUDGET MASHIHGTOH DC 20503;,

~ I ~ t4 FACILITY MAKE 1 LER HUHBER 6 rraua YEAR SEQUEHTIAL REVISION Cook Nuclear Plant- Unit 1 50-315 97 006 01 3 OF 10 TEXT ((f cere space is requ(red. use addit(onal NRC Form 366A's) (17)

Descri tion of Event cont'd 1-NSO-021 Reactor Coolant System post-accident (EIIS/AB-VTV)vent train A solenoid valve 1-IMO-315 East RHR and North Safety Injection to (EIIS/BO-INV) reactor coolant loops 1 and 4 hot legs shutoff valve 1-IMO-316 East RHR and North Safety Injection to (EIIS/BO-INV) reactor coolant loops 1 and 4 cold legs shutoff valve 1-IMO-325 West RHR and south safety injection to (EIIS/BO-INV) reactor coolant loops 2 and 3 hot legs shutoff valve 1-NMO-1 51 Pressurizer relief valve NRV-151 (EIIS/AB-ISV) upstream shutoff valve 1-33-NRV-153 Pressurizer train A pressure relief valve NRV-153 close limit switch The Unit 2 floodup tubes were inspected on March 23, 1997. At that time, a crack was found in the floodup tube 2-IP3-3. This floodup tube contains a cable which supplies power to one of two containment recirculation (CEQ) fans (EIIS/BB-FAN). The CEQ fans operate long term following a loss of coolant accident, and absent qualification data for water submergence, continued operation of the impacted CEQ fan could not be guaranteed.

Cause of the Event The tube damage has been attributed to work practices that resulted in two separate types of failures-material stress cracks and random arc strikes, most probably early in the plant life.

In three isolated instances, unrelated to the material stress cracks, the tube exhibited holes in the tube approximately 1/8"-1/4" wide. These holes had a burned appearance such that they may have been caused by welding activities in the vicinity of the floodup tubes.

The other cause is due to localized stresses to the material at the point where the tube transitions from flexible to a rigid configuration. The causal analysis evaluated the basic tube construction, inspected damaged tubes, and performed an inspection on the installation in the annulus.

The floodup tube construction is a standard single-ply helical corrugated bellows that is constructed from a Type 321 stainless steel. Both ends of the floodup tube are welded to a Type 304 stainless steel fitting with male threads. The fittings constitute a rigid point while the bellows themselves are a flexible member. This type of construction allows the tube to flex uniformly throughout its entire length except at the point where it connects to the fittings.

HRC FORN 366A .S. NUCLEAR REGUULTORY COXNISSIOM ROVED BY ONB NO. 3150-01,04 EXPIRES 5/31/95 ESTINATED BURDEN PER RESPOHSE TO'COHPLY MITH THIS IHFORHATIOH COLLECTIOH REQUEST: 50.0 NRS; LICENSEE LWENT CONTINUATION FORNARD CONHEHTS REGARDING BURDEN ESTINATE TO THE INFORNATION AND RECORDS NANAGEHEHT BRANCH (NHBB 7714), U.S. NUCLEAR REGULATORY COHHISSION, IIASHIHGTON, DC 20555-0001, AHD TO THE PAPERHORK REDUCTION PROJECT (3150-0104), OFFICE OF HANAGEHEHT AND BUDGET MASHINGTOH DC 20503.

FACILITY MANE 1 DOCKET NU)IBER 2 LER NIGER 6 PAGE 3 YEAR SEQUENTIAL REVI SICH Cook Nuclear Plant- Unit1 50-315 97 01 4 OF 10 TEXT (if sore space is required. use additional HRC Fore 366A's) (17)

Cause of the Event cont'd An examination of two cracked tubes which had this second type of failure was performed by DCCNP metallurgical engineers . A portion of their investigation follows:

"An examination of two typically cracked tubes revealed a 3/4" long linear indication oriented parallel to the corrugation at the root of a convolution. The crack was located a distance of two convolutions from the weld attaching the bellows to the threaded fitting. One end of the crack, had a Y-pattern crack that is indicative of a crack initiation point due to excessive bending stress in the thin material. Due to the crack's location, the defect is not welding related.

Although not used in this application, the corrugated bellows is capable of withstanding motion, lateral offset, angular rotation, as well as axial extension and compression over the entire length of the floodup tube.

However, within a localized region, such as where the bellows are attached to the threaded fitting, the bellows transitions from flexible to rigid. At this location, the thin bellows material will not withstand any bending or torsional rotation loading."

The floodup tube installation in the annulus was reviewed to determine which configuration was more prone to failure. It was found that all those floodup tubes that have this type of defect were in those installations where there is a minimum of seven tubes per penetration. This is attributed to the fact that those penetration" installations with more floodup tubes also have more stringent bending restrictions due to space restrictions.

The fact that all these cracks were near the fitting end of the floodup tube and in those installations which require smaller bending radii confirm that the cracks were due to localized stress. Due to the type, location, orientation of the defect and lack of loading during service, these defects were most probably initiated in the bellows during installation or subsequent rework.

Anal sis of the Event These events are reportable under the provisions of 10CFR50.73(a)(2)()l. (8), operation prohibited by the plant's technical specifications, 10CFR50.73(a)(2)(ii), any event or condition that resulted in the condition of the nuclear power plant, including its principal safety barriers, being seriously degraded, and 10CFR50.73(a)(2)(ii)(B), a condition which is outside of the design basis of the plant.

The cables are required to be environmentally qualified per 10CFR50.49. However, the environmental qualification testing did not include submerging the cable in water. Partial test data for Kapton insulated cable shows that one test sample failed after two hours, and a second test sample failed after forty eight hours. On this basis, it was determined that Kapton insulated cable was not suitable for long term use submerged in a sump solution having a pH of 9-10.

iiRC FORH 366A U.S. NUCLEAR REGULATORY COO)I SSION APPROVED BY O)IB NO. 3150-0104 EXP I RES 5i31/95 ESTINATEO BURDEN PER RESPONSE TO COHPLY MITH THIS lNFORHATION COLLECTION REaUESTs 50.0. HRS.

LICENSEE EVENT CONTINUATION FORMARO COHHENTS REGARDIHG'BURDEN ESTIHATE TO'HE INFORNATION AND RECORDS HANAGEHENT BRANCH (HNBB 7714), U.S. NUCLEAR REGULATORY COHHISSIONg MASHINGTOH, DC 20555.0001, AND TO THE PAPERMORK REDUCTION PROJECT (3150-0104) ~ OFFICE OF HANAGEXENT AND BUDGET MASHINGTON DC 20503.

FACILITY NAKE 1 DOCKET aRJÃBER 2 LER NURSER 6 PAGE 3 YEAR SEOUENTIAL REVISION Cook Nuclear Plant - Unit 1 50-315 97 01 5 OF 10 TEXT (if cere space is required, use additional HRC Fora 366A's) (17)

Anal sis of the Event cont'd Because the cracks in fioodup tubes are located below the containment floodup level, water, could enter the tube and the cable would be submerged in a sodium hydroxide solution having a pH of 9 to 10. Submergence in this .

solution would degrade the Kapton insulation, and it would eventually fail. As the time to failure. cannot be accurately predicted, any equipment required for Iong term accident mitigation was considered to be inoperable.

Equipment which could complete its safety function within two hours following the accident was considered operable for the purpose of the analysis presented in this LER.

i lt is not possible to tell when the tubes became cracked. However, the apparent cause of the cracks, welding arc strikes and stress cracking, indicates that they existed prior to discovery. Therefore, it is assumed that the unit was in T/S 3.0.3, which is reportable as a condition which is outside the design basis of the plant and as operation prohibited by the plant's technical specifications.

The result of the evaluation is that, although the potential for equipment failure placed the plant outside of its licensing basis in many instances, there was no postulated failure that is considered to have a major impact with regard to protecting the public health and safety. Also, in many cases the equipment was backed up by unaffected redundant equipment and/or equipment which co'uld perform a similar safety function.

Unit 1 Narrow Ran e Steam Generator Level Transmitters The narrow range steam generator level transmitters (1-BLP-132, -142) provide a signal to the reactor protection system, and they are used for post accident monitoring of the steam generator level (Technical specification 3.3.3.8 requires one operable channel per steam generator). The protection system function would be accomplished prior to the cable's becoming submerged. There are three narrow range steam generator level transmitters per steam generator, and the post accident monitoring function could be accomplished by either the remaining two narrow range transmitters.

Hot Le Wide Ran e Tem erature Recorder I

The hot leg wide range temperature recorder (1-NTR-140, -240) signal is required as input to the RCS subcooling monitor, and the subcooling monitoring system would be less effective since input temperatures from an entire RCS loop would be lost.

The operator also has available subcooling indication using the core exit thermocouples. This is actually the preferred method of determining subcooling since it provides conservative results. Thus the loss of 1-NTR-140 and 1-NTR-240 would not have significantly impacted plant operations and is judged to have had no adverse impact on public health and safety.

MRC FORM 366A S. N)CLEAR REGULATORY COMMISSION (NB MO- 3150-0104 EXPIRES 5/3'I/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS.

LICENSEE 'TTENT CONTlNUATION FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE INFORMATION ANO RECORDS MANAGEMEHT BRANCH (MNBB 7714), U.S. NUCLEAR REGULATORY COMHISSIOH ~

WASHINGTON, OC 20555-0001, ANO TO THE PAPERWORK REDUCTION PROJECT (3150 0104)g OFFICE OF MANAGEMENT AND BUDGET WASHINGTON DC 20503.

FACILITY NAME LER MINBER 6 PAGE 3 SEQUENTIAL REVISION Cook Nuclear Plant- Unit 1 50-315 97 01 6 OF 10 TEXT itf Nore space is required. use additional MIC Fons 3664's) (I7)

, Anal sls of the Event cont'd H dro en Recombiner The Cook Nuclear Plant has two hydrogen recombiners of which only one is required for accident mitigation.

Only one of the two recombiners (1-HR-1) was adversely impacted by a cracked floodup tube.

The hydrogen recombiner is used to maintain the long-term hydrogen concentration inside containment below 4 volume per cent. Although the principal means of hydrogen control that is included fn the plant design basis are two electric hydrogen recombiners combined with two containment air recirculation fans, additional means of hydrogen control, hydrogen igniters, were added to address the possibility of excessive hydrogen concentrations that may exist following a severe accident. An analysis has been performed to show that the igniters are capable of preventing hydrogen ignition from endangering the public health and safety when hydrogen concentrations are excessively high. Therefore, in the event that both recombiners were to fail, and the hydrogen concentrations were to build up to excessive amounts, it is believed that the hydrogen igniters would prevent the ensuing problems with hydrogen ignition from adversely impacting public health and safety.

Although the igniters do not have the data to support longevity of operation, they are capable of supporting operation for at least one week. It is believed that the igniters would last for periods considerable beyond that time. During the time that there was total reliance on the hydrogen igniters, it may be possible to repair the unaffected electric hydrogen recombiner (if the repair could be performed outside the containment) or establish some other means of long term hydrogen control, if it were necessary.

Based on the combination of the unlikelihood of failure of the redundant hydrogen recombiner, combined with the availability of the hydrogen igniters, it is concluded that there would be an almost negligible chance that the cracks in the fioodup tubes servicing electrical cables to 1-HR-1 would have resulted in significant problems associated with hydrogen ignition should a design basis LOCA have occurred at the plant. It is therefore concluded that the crack in the floodup tube associated with 1-HR-1 did not represent a significant hazard with regard to the protection of the public health and safety.

Containment Recirculation Fan Valve The Cook Nuclear Plant has two recirculation fans, only one of which is required for accident mitigation.

Only one of the recirculation fans was impacted by the cracked floodup tube containing the cable associated with valve 1-VMO-102.

The containment air recirculation system valve is activated 10 minutes after the accident occurs. Based on partial test data which demonstrate that a minimum of two hours is required before Kapton insulation is degraded to the point where it is no longer effective, it is concluded that this valve would have performed its function prior to the insulation's being significantly degraded.

MRC FORM 366A S N)CI.EAR REGULATORY COOII SS I ON BY (NB MO. 3150-0104 EXPIRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY MITH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS.

LICENSEE EVENT CONTINUATION FORNARD COMMENTS REGARDING BURDEN ESTIMATE TO THE INFORMATION AHD RECORDS MANAGEMEHT BRANCH (MHBB 7714), U.S. NUCLEAR REGULATORY COMMISSION/

MASHIHGTOH, DC 20555-0001, AND TO THE PAPERNORK REDUCTION PROJECT (3150-0104), OFFICE OF MANAGEMENT AND BUDGET llASHIHGTOH DC'20503.

FACILITY MANE 1 DO(XET NIGER 2 LER NIGER 6 PAGE 3 YEAR SEQUENTIAL REVISION Cook Nuclear Plant - Unit 1 50-315 .

97 006 01 7 OF 10 TEXT (if sere space is required. use additional NRC Fons 36Q's) (17)

Anal sls of the Event cont'd Reactor Vessel Head Vent Valve The Cook Nuclear Plant has two head vent valves, only one of which is required by the technical specifications to be operable. Only one of the head vent valves was impacted by a cracked floodup tube.

The reactor vessel head vent system (1-NSO-021) is a series/parallel arrangement where four valves are supplied by two separate power trains. An identical arrangement exists for the pressurizer head vent.

No credit is taken for the reactor head vents in the FSAR design basis accident analysis. They are strictly a contingency to be used for severe accidents. The reactor head vents were installed in the Cook Nuclear Plant in response to 10CFR50.44 (c)(3)(iii) to vent a hydrogen bubble in the reactor head in the event of a degraded core accident with significant hydrogen generation. This head vent is also used in the Emergency Operating Procedures to aid in vessel depressurization after all other mechanisms have failed, including both the primary and secondary power operated relief valves.

Cold Le to Hot Le In'ection Valves Valves 1-IMO-315, 1-IMO-316 and 1-IMO-325 are required to function when switching from cold leg to hot leg injection following a loss of coolant accident. Valves 1-IMO-315 and 1-IMO-325 are required to open to provide a hot leg flowpath to loops 1,2,3, and 4. Valve 1-IMO-316 is required to close to block the cold leg flowpath to loops 1 and 4.

Using the current licensed methodology, the inability to switch to hot leg recirculation would result in boron precipitation in the core and possible heat transfer degradation, potentially leading to a cladding temperature heatup. However, Westinghouse has developed a new methodology which, if licensed and implemented, would eliminate the need to switch to hot leg recirculation. This methodology models the flow through the gap between the hot leg nozzle and the barrel as a mechanism for transporting borated vessel water to the sump. The Westinghouse WCAP presents the methodology and documents a generic analysis that is applicable to most Westinghouse 3 and 4 loop plant, including Cook. Among the conclusions drawn from the generic analysis is that the ECCS does not need to be aligned to the RCS hot legs post-LOCA in order to limit the buildup of boron. As such, the hot Ieg nozzle gap would have limited the buildup of boron after the LOCA, even if the ECCS could not have aligned to the hot legs. This would have prevented boron precipitation in the core, maintaining the heat transfer capability . Thus the inability to align the ECCS to the hot legs would not have resulted in a violation of any of the 10 CFR 50.46 criteria.

Power 0 crated Relief Valve Block Valve 1-NMO-151 is a normally open block valve for a pressurizer power operated relief valve (PORV), and is the only one of the three PORV block valves that was impacted by a cracked floodup tube.

The Cook Nuclear Plant pressurizer has three PORVs which limit reactor coolant system pressure. The PORVs, which are spring closed and air-open upon actuation of their associated solenoid valve, operate automatically or by remote manual control. Remotely operated block valves are provided to isolate the PORVs.

MRC FORH 366A .S NUCLEAR REGULATORY COXRISSIOH BY ORB MO. 3150-0104 EXPIRES 5/31/95 ESTIHATED BURDEN PER RESPOHSE TO COMPLY NITH THIS INFORHATION COLLECT ION RFCUEST: 50.0'RS.

LICENSEE EVEBFZ CONTINUATION FCRllARD COHHENTS REGARDING BURDEN ESTIHATE TO THE IHFORHATIOH AHD RECORDS'HANAGEHENT BRANCH'HHBB 7714), U.S. NUCLEAR REGULATORY COHHISSIOH, NASNIHGTON, DC 20555-0001, AHD TO THE PAPERHORX REDUCTION PROJECT (3150-0104), OFFICE OF HANAGEHENT AND BUDGET MASHIHGTOH DC 20503.

FACILITY MARE DOCKET NUMBER 2 LER NUMBER 6 PAGE 3 YEAR SEOUEHTIAL REVI SIGH Cook Nuclear Plant - Unit 1 50-315 97 01 SOP 10 TEXT Of core space fs required. use additional HRC Fona 366A's) (17)

Anal sis of the Event cont'd Power 0 crated Relief Valve Block cont'd To evaluate the impact of the cracked floodup tubes, four conditions were considered: 1) FSAR accidents;

2) high energy line breaks inside containment where immediate isolation of the PORV is required; 3) conditions outside of the normal FSAR analysis where it may be necessary to isolate the PORV after the electric wire housed in the cracked PORV has been submerged for several hours, and 4) conditions outside the FSAR analysis where it may be necessary to open an isolated PORV after the electric wire housed ln the cracked PORV has been submerged for several hours. Each of these conditions is discussed below.

The single Chapter 14 accident analysis which requires PORV operability is the steam generator tube rupture (SGTR) with a loss of offsite power. In this event, one PORV is required to reduce primary system pressure during the recovery phase of the accident to slightly above the secondary side pressure. A second PORV is required to be operable for single failure considerations. The UFSAR Chapter 14 SGTR is not considered to be a flooding event, and therefore the cracked floodup tubes would not have impacted the PORV block valve operability for this accident.

f Credit is taken in the plant emergency operating procedures for the PORVs to recover from a variety of accidents. This would include the category of events and accidents that cc"d cause the PORVs to open and fail to close, resulting in a small break LOCA (e.g. normal plant cooldown, activation of the safety injection system, or severe transients such as a feedwater line br'eak or steam line break inside containment). The main function of the PORV block valves is to isolate a PORV if the PORV fails in the open position. For events of the type cited above, either they do not cause containment flooding, or if they do cause flooding, the need to close the PORVs occurs early enough in the transient that the block valves would still be considered operable in spite of the water intrusion that may have occurred due to cracks in the floodup tubes.

A third category of events include long term recovery actions such as response to inadequate core cooling or response to degraded core cooling where the containment could be flooded. Each of these events require that a stuck open PORV be isolated. These events are beyond those considered in the plant design basis, and it is considered highly unlikely that an adverse accident of this type could occur at the same time that a PORV sticks open, the cables are submerged, and the block valve fails to close when it is required.

The final category is events that require a PORV to be open to facilitate accident recovery. An example of this would be the feedwater line break recovery. However, not all of the three PORVs would have been affected by cracks in the floodup tubes, and at least one would be available for this purpose. This meets the minimum requirement.

NRC FORM 366A .S. NUCLEAR REGULATORY COMMISSION ROVED BY OMB HO. 3150-0104 EXPIRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY NITH THIS IHFORMATION COLLECTIOH REQUEST: 50.0 HRS;.,

LICENSEE EVENT CONTINUATION FORIIARD COMMENTS REGARDING BURDEN ESTIMATE TO INFORMATION AND RECORDS MANAGEMENT BRANCH

'HE (MHBB 7714), U.S. NUCLEAR REGULATORY COMMISSION;

'WASHINGTON, DC 20555-0001, AND TO THE PAPERNORK REDUCTION PROJECT (3150.0104), OFFICE OF MANAGEMENT AND BUDGET 'NASHIHGTON DC 20503.

FACILITY NAME 1 DOCKET NU)IER 2 LER NUMBER 6 PAGE 3 YEAR SEQUENTIAL REVISIOH Cook Nuclear Plant - Unit 1 50-315 97 006 01 9 OF 10 TEXT (if aore space is required. use addit(onal NRC Fora 366A's) (17)

Anal sls of the Event cont'd Unit 2 Containment Air Recirculation/H dro en Skimmer Fan The Cook Nuclear Plant has two containment air recirculation/hydrogen skimmer (CEQ fans), only one of which is required for accident mitigation. Only one fan was adversely impacted by a cracked floodup tube.

The CEQ fans are required to provide a continuous mixing of the containment atmosphere for the long term post blowdown accident environment. They are also required to prevent the formation of hydrogen pockets within the various compartments and subcompartments of the ice condenser containment.

Two full capacity fans, each capable of blowing air from the upper volume into the lower volume are provided. For accident analysis conditions, only one fan is modeled based upon the limiting single failure of a train of containment safeguards equipment. The air recirculation fans have sufficient head to overcome the compartment pressure differentials that occur after the initial RCS blowdown. The fans will blow air from the upper compartment to the lower compartment thereby retumlng air to the lower compartment which was displaced by the blowdown. Although the fans are modeled during both the containment response transient following a LOCA and MSLB, the greatest impact resulting from their activation is seen during the LOCA transient response due to the long term transient scenario. The air return fans are modeled to operate upon reaching the high-high containment pressure setpoint following a ten minute delay. During the LOCA response transient the fans provide a flow path early in the transient, therefore their function plays an important role (before the time of peak pressure) in the containment response calculation. Similarly during the MSLB containment response calculation the fans function in a likewise manner. However, the time the fans activate follow the time when the containment peak pressure and temperature occurs, therefore their impact on the containment response transient is minimal. Their primary effect is on the rate of containment depressurization and cooldown after 10 minutes into the MSLB containment response transient.

Based upon sensitivities which have been performed for an ice condenser plant similar to the Cook Nuclear Plant when considering inoperable air return fans, the effect of the loss of the air return fan on containment peak pressure was 5 psi. Since the Cook design pressure is 12 psi, this means that the maximum pressure achieved by the containment should both fans be lost is 17 psi. Although above the plant design basis of 12 psi, this is well within the containment ultimate capability of approximately 36 psi.

The potential loss of CEQ fans also means the loss of ability to remove hydrogen from the compartments of the Cook Nuclear Plant. This will not occur until two hours into the accident. As part of the Cook Nuclear Plant's probabilistic risk assessment, studies have been performed to evaluate the loss of CEQ fans following a severe accident. These studies have concluded that no adverse impact on containment performance is expected due to containment recirculation fan failures.

On the basis of the above, it is concluded that the loss of one CEQ fan did not adversely impact the public health and safety. It is further pointed out, that only one of the two redundant fans was impacted, and therefore following a high energy line break inside containment the plant may have stayed with its design basis containment pressure of 12 psi.

NRC FORH 366A .S. NUCLEAR REGULATORY COXHI SSICI BY'ORB NO. 3150-0104 EXPIRES 5/31/95 ESTIHATED BURDEN PER-RESPONSE TO COHPLY WITH LICENSEE EVENT CONTINUATION THIS INFORHATION.COLLECTION'REQUEST: 50.0 NRS'.

FORIIARD COHHENTS REGARDING BURDEN ESTIHATE TO THE INFORHATION AND RECORDS HANAGEHENT BRANCH (HNBB 7714), U.S. NUCLEAR REGULATORY COHHISSION, MASNINGTON, DC 20555-0001, AND TO THE PAPERNORK REDUCTION PROJECT (3150-0104), OFFICE OF" HANAGEHENT AND BUDGET MASNINGTON DC 20503.

FACILITY NAHE 1 DOIET NUNBER 2 LER NUNBER 6 PAGE 3 YEAR SEQUENTIAL REVISION Cook Nuclear Plant - Unit 1 5015 97 01 10 OF 10 TEXT ((f more space is required. use additional NC Form 36EA's) (17)

Corrective Action Critical areas for all floodup tubes in each unit have been inspected for cracks.

The damaged Unit 1 EQ fioodup tubes and Unit 2 floodup tubes have been replaced.

Preventive Action Adequate precautions for welding in the vicinity of electrical equipment have been identified in the AEP Welding Manual, General Welding Requirements, step 6.13 which in condensed version states: base materials and other metallic regions outside of the weld zone shall be protected to prevent inadvertent arc strikes. In addition, PMI-2270 (FIRE PROTECTION), contains the Welding, Burning, 8 Grinding Permit which is issued for all welding activities. The permit covers area requirements which provide direction to cover electrical equipment arid cable trays with fire blanket. To supplement these plant requirements, an inspection as stated below will be performed to verify that the tubes have not been damaged prior to start-up after outage work has been performed.

Work Standards to the Nuclear Plant Maintenance (NPM) and Environmental Qualification Preservation Documents (EQPD) will be enhanced to identify that while working on the floodup tubes there is a need to avoid adding undue localized stress to the floodup tubes and then to verify that no cracks have developed . The Work Standards to the NPM for floodup tube installation have already been revised to include these precautions. As a long term action, new EQPD will be issued by June 1, 1998 for floodup tubes to identify the critical EQ parameters.

Inspections will be made at the beginning of each outage to check for any cracks. Inspections will also be made at the end of the outage to ensure that no outage activities damaged any tubes.

In addition, although not contained in a formal program, the knowledge that the tubes are subject to this type of damage will heighten awareness and improve work being done on and around the floodup tubes.

Failed Com onent Identification Not Applicable Previous Similar Events None