| number = ML17341A430
| number = ML17341A430
| issue date = 08/05/1981
| issue date = 08/05/1981
| title = Affidavit Responding to Aslb 810728 Order Re Void Found in Area Adjoining & Beneath Equipment Hatch.No Breach of Structural Integrity of Unit 3 Containment Pressure Boundary Occurred
| title = Affidavit Responding to ASLB 810728 Order Re Void Found in Area Adjoining & Beneath Equipment Hatch.No Breach of Structural Integrity of Unit 3 Containment Pressure Boundary Occurred
| author name = Flugger F
| author name = Flugger F
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:'UNITED STATES OF AMERICA NUCLEAR REGULATOPY COMMISSION BEFORE THE ATOMIC'AFETY AND LICENSING'OARD In the Matter of FLORIDA POWER 6 LIGHT COMPANY (Turkey Point Nuclear Generating Units Nos.3 and 4))))))))Docket Nos.50-250-SP 50-251-SP Proposed Amendments to Facility Operating License to Permit Steam Generator Repairs)AFFIDAVIT OF F.G..FLUGGER My name is Frederick G.Flugger.My business address is 9250 West Flagler Street, Miami, Florida 33152.I am Manager of Plant Engineering.Licensing, Power Plant Engineering Department, Florida Power E Light Company'(FPL or Licensee).
{{#Wiki_filter:'UNITED STATES OF AMERICA NUCLEAR REGULATOPY COMMISSION BEFORE THE ATOMIC'AFETY AND LICENSING'OARD In the Matter of                       )   Docket Nos. 50-250-SP
A statement of my professional.background and qualifications has been previously provided'ith the'"Affidavit of Frederick G.Flugger and H.H.Jabali on Contention 4A," which was attached to","..icensee's Answer Supporting NRC Staff Motion for Summary Disposition of Contention 4A" (April 17, 1981).The purpose of this Affidavit is to respond to the Order of the Licensing Board dated July 28, 1981.This Order referred to the discovery, during preparati'ons for the steam generator replacement, of a void in the concrete in tne containment in the area adjoining and beneath the equipment hatch.It also referred to Section 4.1.2 of the Steam Generator Repair Report (SGRR), which states that the PDR o 6 ag0806 9 R ADQCK 05000250'DR lt steam generator lower assemblies (SGLAs)will be removed through the equipment hatch and that"No modifications impacting the integrity of the equipment hatch as a pressure boundary structure are contemplated at this time." The, Board'then posed the following questions:
                                            )                  50-251-SP FLORIDA POWER    6 LIGHT COMPANY      )
l.How was the void in the containment wall d'iscovered?
                                            )    Proposed Amendments     to (Turkey Point Nuclear                )  Facility   Operating License Generating Units Nos.      3          )    to Permit Steam Generator and 4)                                )    Repairs)
2.Did the discovery result from breaching of the containment wall, or in some other fashion?3..If the wall was breached, why was the Licensing Board not informed?4.Should the statemen'ts.of Licensee in the SGRR be considered a commitment,?
AFFIDAVIT OF F. G.. FLUGGER My name   is Frederick   G. Flugger. My business address is   9250 West   Flagler Street, Miami, Florida     33152. I am Manager   of Plant Engineering .Licensing, Power Plant Engineering Department, Florida Power     E Light Company '(FPL or Licensee).
5.Plhat has been the role of the NRC Staff in this matter?Finally, the Order directed th'e Licensee and the NRC Staff to"provide the Board with full information concerning the apparent breaching of the containment wall at Unit 3, including answers to the questions raised in this Order." Each of the Board's questions is discussed below.l.How was the void in the containment wall discovered?
A statement of my professional .background and qualifications has been previously provided'ith the '"Affidavit of Frederick G.
The void in the containment wall was discovered during removal and replacement of a portion of the equipment hatch
Flugger and H. H. Jabali on Contention 4A," which was attached to ","..icensee's Answer Supporting NRC Staff Motion for Summary Disposition of Contention 4A"         (April 17, 1981).
The purpose of this Affidavit is to respond to the Order of the Licensing Board dated July 28, 1981. This Order referred to the discovery, during preparati'ons for the steam generator replacement, of a void in the concrete in tne containment in the area adjoining and beneath the equipment hatch. It also referred to Section 4.1.2 of the Steam Generator Repair Report (SGRR), which states that the PDR o 6 ag0806 R ADQCK 9          05000250
                'DR


sleeve in accordance with Sections 3.2.5 of the SGRR.This/section states: "The following structures or portions of structures will be removed to provide a path for the lower assembly (refer to Figures 3.2-4 through 3.2-6 for i;llustration):
lt steam generator  lower assemblies (SGLAs) will be removed through the equipment hatch and that "No modifications impacting the integrity of the equipment hatch as a pressure boundary structure are contemplated at this time." The, Board'then posed the following questions:
A portion of the equipment hatch sleeve at elevation+30'-6".(A small section of the steel sleeve will be replaced with thicker steel to assure load trans-fer to the supporting concrete wall during ingress and egress of heavy equipment.
: l. How was  the void in the containment wall d'iscovered?
The affected portion of steel to be replaced does not form a part of the containment pressure boundary nor affects the structural integrity of the containment.)" Copies of the relevant pages of the SGRR (pp.3-9, 3-9a)are attached for convenience.
: 2. Did the discovery  result from breaching of the containment wall, or in    some other fashion?
3.. If the  wall  was breached, why was the Licensing Board not informed?
: 4. Should the statemen'ts .of Licensee  in the SGRR be considered  a commitment,?
: 5. Plhat has been the role of the  NRC Staff in this matter?
Finally, the Order directed    th'e Licensee and the  NRC Staff to "provide the Board with full information concerning the apparent breaching of the containment wall at Unit 3, including answers to the questions raised in this Order."
Each of the Board's questions is discussed below.
: l. How was the void in the containment wall discovered?
The void in the containment wall was discovered during removal and replacement of a portion of the equipment hatch


Figure l depicts the location of the equipment hatch sleeve and the location of the void.As can be seen from the figure, the equipment hatch sleeve varies in thickness.
sleeve in accordance with Sections 3.2.5 of the     SGRR. This
In order to assure load transfer during movement of heavy objects (such as an SGLA)through the equipment hatch during the repairs, FPL planned to replace the thin steel portion of the sleeve with a thick steel plate.During removal of a portion of the affected areas of the sleeve, FPL discovered the void in the concrete underlying the plate.The extent of the void was determined by probing, and a larger portion of the plate was subsequently removed to expose the entire void.The void is not extensive, it was not caused by the repair work, and it was probably formed during construction of Unit 3.It should be noted that upon completion of construction, the containment was subjected to and successfully passed, testing required by the NRC prior to initial operation.
                  /
Thus, it is reasonable to conclude that the void does not impact upon the integrity of the pressure boundary.As is apparent from Figure 1, removal and replacement of a'ortion of the thin section of the sleeve does not affect the containment pressure boundary.The containment pressure boundary consists of the internal containment steel liner, the gasketed equipment hatch closure door, and part of the thick section of the steel'sleeve.The equipment hatch sleeve area involved in the removal and replacement of the
section states:
                "The following structures or portions of structures will be removed to provide a path for the lower assembly (refer to Figures 3.2-4 through 3.2-6 for    i;llustration):
A portion of the equipment hatch sleeve at elevation +30'-6". (A small section of the steel sleeve will be replaced with thicker steel to assure load trans-fer to the supporting concrete wall during ingress and egress of heavy equipment. The affected portion of steel to be replaced does not form a part of the containment pressure boundary nor affects the structural integrity of the containment.)"
Copies of the relevant pages of the     SGRR  (pp. 3-9, 3-9a) are  attached for convenience.


thin section of the sleeve is outside of the containment.
Figure l depicts the location of the equipment hatch sleeve and the location of the void. As can be seen from the figure, the equipment hatch sleeve varies in thickness.
pressure boundary.Consequently, no portion of, the containment pressure boundary was modified'r affected by removal of the sleeve.The void is exterior to the containment pressure boundary, and neither the void nor procedures followed for repair of the void will affect the containment pressure boundary.Prior to return of Unit 3 to power, appropriate local leak testing will be con-ducted for areas affected by the steam generator repair activity to ensure integrity of the containment, pressure boundary.See SGRR section 4'.l.2.The void is localized and not large;it will be repaired;the repair procedure is straight forward;and the void will in no way impact the SGLA repair activity.The NRC has been informed of the existence of the void and will be provided with the data necessary to disposition this matter.2.Did the discovery result from'breaching of the containment wall, or i;n.some other fashion'?As.described above, the discovery of the void did not result from a breach of the containment wall, but instead from removal of a portion of the thin section of the slegve.There has been no breach of the structural integrity of the containment pressure boundary.
In order to assure load transfer during movement of heavy objects (such as an SGLA) through the equipment hatch during the repairs, FPL planned to replace the thin steel portion of the sleeve with a thick steel plate. During removal of a portion of the affected areas of the sleeve, FPL discovered the void in the concrete underlying the plate. The extent of the void was determined by probing, and a larger portion of the plate was subsequently removed to expose the entire void.
0 3.If the wall was breached, why was the Licensing Board not informed?Since the wall was not breached, and the void was not caused by the repair work and does not impair the safety of the repairs, it was not thought necessary to inform the Board.However, as indicated in response to Question 5, below, the NRC Staff was advised.4.Should the statements of Licensee in the SGRR be considered a commitment?
The void is not extensive,   it was not caused by the repair work, and   it was probably formed during construction of Unit 3. It should be noted that upon completion of construction, the containment was subjected to and successfully passed,   testing required by the NRC prior to initial operation. Thus, it is reasonable to conclude that the void does not impact upon the integrity of the pressure boundary.
Yes.The SGRR provides the design and safety related.bases for the repair that, have been reviewed and accepted by NRC.It is the Safety Analysis Report for the repai:r project.Any deviation from the SGRRh design and safety-related bases would be reviewed by FPL in accordance with the Commission's regulations at 10 CFR g 50.59.Any change in the repair activity, as discussed in the SGRR, that involves an Unreviewed Safety Question must be approved by NRC.FPL's statements in the SGRR that the Steam Generator lower assemblies would be removed through the equipment hatch and that no modifications would be made which would impact the integrity of the equipment hatch as a pressure boundary structure may be considered as design bases and are therefore commitments.
As is apparent from Figure 1, removal and replacement of a'ortion of the thin section of the sleeve does not affect the containment pressure boundary. The containment pressure boundary consists of the   internal containment steel liner, the gasketed equipment hatch closure door, and part of the thick section of the steel 'sleeve. The equipment hatch sleeve area involved in the removal and replacement of the
Any deviations from these commitments (none are contemplated) would be dispositioned in accordance with 10 CFR 5 50.59.


It should be noted that in addition to design and safety-related bases,, the SGRR also contains details relating to the final design and implementing procedures.
thin section of the sleeve is outside of the containment. pressure boundary. Consequently, no portion of,the containment pressure boundary was modified'r affected by removal of the sleeve.        The void is exterior to the containment pressure boundary, and neither the void nor procedures followed for repair of the void will affect the containment pressure boundary. Prior to return of Unit 3 to power, appropriate local leak testing will be con-ducted for areas affected by the steam generator repair activity to ensure integrity of the containment, pressure boundary. See SGRR section 4'.l.2.
Such details are provided in the SGRR primarily to demonstrate the feasibility of the repair activity, and to respond to NRC Staff queries.'These details may be modified during development of the final design, e.g., to accomodate a design approach that results in a lower man-rem exposure, or that is more cost effective.
The void is localized and not large;    it will be repaired; the repair procedure is straight forward; and the void will in no way impact the SGLA repair activity. The NRC has been informed of the existence of the void and will be provided with the data necessary to disposition this matter.
:Ordinarily ,such changes in detail do not involve an Unreviewed Safety Question and may be made in accordance with 10 CFR 5 50.59.Thus, in all cases the detailed final implementation will comply with the commitments stated in the SGRR.See SGRR, p.3-1.5.What has been the role of the NRC Staff in this matter?The void was first discovered on July 4, 1981, and'quality control and engineering evaluation process was initiated.
: 2. Did the discovery result from 'breaching of the containment wall, or i;n. some other fashion'?
By July 10, 1981, enough information was available to determine that the void was reportable.
As .described above, the discovery of the void did not result from a breach of the containment wall, but instead from removal of a portion of the thin section of the slegve.
Therefore, by telephone on that day, FPL notified the Office of Inspection and Enforcement for Region II of the existence of the void.This was followed by the submission of a License Event..Report, on July 24,, 1981.To the best of FPL's knowledge, the NRC Staff is reviewing this situation in accordance with its normal procedures.  
There has been no breach of the structural integrity of the containment pressure boundary.
 
0
: 3. If the  wall was breached, Board not informed?
why was the Licensing Since the wall was not breached,      and the  void was not caused by the repair work and does not impair the safety of the repairs,      it was not thought necessary to inform the Board. However, as indicated in response to Question 5, below, the NRC Staff was advised.
: 4. Should the statements of Licensee in the SGRR be considered a commitment?
Yes. The SGRR provides the design and safety related
.bases  for the repair that, have been reviewed and accepted by NRC. It is the Safety Analysis Report for the repai:r project.
Any deviation from the SGRRh design and safety-related bases would be reviewed by FPL in accordance with the Commission's regulations at 10 CFR 50.59. Any change in the repair g
activity, as discussed in the SGRR, that involves an Unreviewed Safety Question must be approved by        NRC.
FPL's statements    in the SGRR  that the  Steam Generator lower assemblies would be removed through the equipment hatch and that no modifications would be made which would impact the    integrity of the    equipment hatch as a pressure boundary structure may be considered as design bases and are therefore commitments.        Any deviations from these commitments (none  are contemplated) would be dispositioned in accordance with  10 CFR  5  50.59.
 
It should be noted that in addition to design and safety-related bases,, the SGRR also contains details relating to the final design and implementing procedures. Such details are provided in the SGRR primarily to demonstrate the feasibility of the repair activity, and to respond to NRC Staff queries.     'These details may be modified during development of the final design, e.g., to accomodate a design approach that results in a lower man-rem exposure, or that is more cost effective. :Ordinarily
,such changes in detail do not involve an Unreviewed Safety Question and may be made in accordance with 10 CFR     5 50.59.
Thus, in all cases the detailed final implementation will comply with the commitments stated in the SGRR. See SGRR, p. 3-1.
: 5. What has been the role of the NRC Staff in this matter?
The void was first discovered on July 4, 1981, and' quality control and engineering evaluation process was initiated.
By July 10, 1981, enough information was available to determine that the void was reportable. Therefore, by telephone on that day, FPL notified the Office of Inspection and Enforcement for Region II of the existence of the void. This was followed by the submission of a License Event..Report, on July 24,, 1981.
To the best of FPL's knowledge, the NRC Staff is reviewing this situation in accordance with its normal procedures.
 
In, summary, a pre-existing concrete void was discovered during the course of repair work as described in the SGRR, this work did not entail a breach of the containment pressure boundary or cause the existence of the void, and the existence of the void will not impact the safety of the repair activity.


In, summary, a pre-existing concrete void was discovered during the course of repair work as described in the SGRR, this work did not entail a breach of the containment pressure boundary or cause the existence of the void, and the existence of the void will not impact the safety of the repair activity.
~,
~,
Figure l Diagram of Equioment Hatch Area+Pressure Boundary~)~~~'~g~Sealing Surface Steel Sleeve Outside Containment void Equipment Hatch Door\~Inside, Containment
Figure           l Diagram of Equioment Hatch Area+
~~~~~~~~I~~~~~~~~~4~~Steel Liner Concrete Containment Wall*This diagram is not drawn to scale and omits components which are not relevant to the discovery of the void.It represents the configuration at the time of void discovery.  
Pressure Boundary
                                                    ~   ~
                          ~     )  ~
Sealing
                                                          ~ g     ~
Surface Steel Sleeve Outside                                                                                           Equipment Containment                                                                                     Hatch void                                                                       Door
                \ ~
Inside, Containment
                                                                  ~   ~
                        ~   ~
                                                                      ~ ~
                      ~
                          ~
I ~
                                                ~
                                                      ~
                                                            ~   ~         ~ ~           Steel Liner 4
                                                                                ~   ~
                                ~
                        ~
Concrete Containment Wall
        *This diagram is not drawn to scale and omits components which are not relevant to the discovery of the void. It represents the configuration at the time of void discovery.
 
~)
~)
10 FURTHER AFFIANT SAYETH NOT Date:)/jhow,~g (s'rederick G.Flugger STATE OF FL'ORIDA', COUNTY OF DADE)))')SS.r SWORN to and subscribed before me this'i'ay Notary Public My Commission Expires: 12-05-82 0~)P SGRR g.Service air piping h.Primary service water piping Location of cut areas for reactor coolant system, main steam system, and main feedwater system are shown on Figures 3.2-1, 3.2>>2, and 3.2-3, respectively.
10 FURTHER AFFIANT SAYETH NOT Date:
As appropriate the open ends of cut piping will be covered to ensure cleanliness during the repair.The governing overall code for the steam generator replacement shall be the ASME Section XI, 1977 Edition with addenda through the summer of 1978.3.2.5 Concrete and Structural Steel The fol'lowing structures or portions of structures within the containment will be removed to provide'path for the lower assembly (refer to Figures 3.2-4 through 3.2-6 for illustration):
                                            )
4 a.A section of the steam generator"C" shield wall above eleva-tion+58'or Unit 4.A section of the steam generator"A" shield wall above elevating+58'or Unit 3.b.A section of the operating floor concrete at elevation+58'ncluding a steam generator"A" upper support embed for Unit 3 and steam generator"C" thrust beam for Unit 4 c.The removable secondary shield wall panels opposite the contain-ment equipment hatch from elevation+30'-6" to elevation+58', and an additional width of secondary shiel'd wall opposite the equipment hatch from elevation+30'-6" to elevation+58'.A portion of the floor framing and grating at elevation+58'bove the equipment hatch e.A portion of the floor framing and removable floor slabs at elevation+30'-6" at the low point of the equipment hatch The upper portion of the steel stairway near'he equipment hatch opening ge A reinforced grouted pad in the equipment hatch at elevation+30'-6" h.A portion of the truss system tie rods to allow for clearance of the temporary polax crane trolley.(The truss system was originally utilized in the construction of the containment and does not perform any structural related function at px'esent,)'-9 Revision 7 March 1980 0 I 4 SGRRA portion of the equipment hatch sleeve.at elevation+30'-6".(A small'ectio'n of the steel sleeve will be replaced with thicker steel to assure load transfer to the supporting concrete wall during ingress and egress of heavy equipment.
                                          /
The affected portion of steel to be replaced does not form a part of the containment pressure boundary nor affects the structural integrity, of the containment.)
jhow,~g G. Flugger (s'rederick STATE OF FL'ORIDA',   )
3.2.5.1 Removal of Concrete Structures Removal of bulk volumes of containment internal structural concrete will utilize equipment and techniques commercially available.
                      ))    SS.
The intent is 3-9a Revision 7 March 1980 I 0~IA f1+}}
COUNTY OF DADE       ')
SWORN to and subscribed before me this 'ir      'ay Notary Public My Commission Expires:           12-05-82
 
0 ~) P SGRR
: g. Service   air piping
: h. Primary service water piping Location of cut areas for reactor coolant system, main steam system, and main feedwater system are shown on Figures 3.2-1, 3.2>>2, and 3.2-3, respectively. As appropriate the open ends of cut piping will be covered to ensure cleanliness during the repair.
The governing     overall code for the steam generator replacement shall                 be the ASME   Section XI, 1977 Edition with addenda through the summer of 1978.
3.2.5       Concrete and Structural Steel The fol'lowing structures or portions of structures within the containment will be   removed to provide'     path for the lower assembly (refer to Figures 3.2-4 through 3.2-6 for illustration):                   4
: a. A section of the steam generator "C" shield wall above eleva-tion +   58'or Unit 4. A section of the steam generator "A" shield wall above elevating + 58'or Unit 3.
: b. A section of the operating floor concrete at elevation +
a steam generator "A" upper support embed for Unit             58'ncluding 3
and steam generator "C" thrust beam for Unit 4
: c. The removable secondary shield wall panels opposite the contain-ment equipment hatch from elevation + 30'-6" to elevation + 58',
and an additional width of secondary shiel'd wall opposite the equipment hatch from elevation + 30'-6" to elevation +               58'.
A portion of the floor framing and grating at elevation +
the equipment hatch                                                            58'bove
: e. A portion of the floor framing and removable floor slabs at elevation + 30'-6" at the low point of the equipment hatch The upper   portion of the steel stairway near'he equipment hatch opening ge   A reinforced grouted pad in the equipment hatch at elevation
              + 30'-6"
: h. A portion of the truss system tie rods to allow for clearance of the temporary polax crane trolley. (The truss system was originally utilized in the construction of the containment and does not perform any structural related function at px'esent,)'-9 Revision       7 March 1980
 
0 I
4
 
SGRR A portion of the equipment hatch sleeve. at elevation +30'-6".
(A small'ectio'n of the steel sleeve will be replaced with thicker steel to assure load transfer to the supporting concrete wall during ingress and egress of heavy equipment. The affected portion of steel to be replaced does not form a part of the containment pressure boundary nor affects the structural integrity, of the containment.)
3.2.5.1 Removal of Concrete Structures Removal of bulk volumes of containment internal structural concrete will utilize equipment and techniques commercially available. The intent is 3-9a                                 Revision 7 March 1980
 
I 0   f1+
        ~IA}}

Latest revision as of 22:57, 3 February 2020

Affidavit Responding to ASLB 810728 Order Re Void Found in Area Adjoining & Beneath Equipment Hatch.No Breach of Structural Integrity of Unit 3 Containment Pressure Boundary Occurred
ML17341A430
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/05/1981
From: Flugger F
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17341A429 List:
References
ISSUANCES-SP, NUDOCS 8108130076
Download: ML17341A430 (24)


Text

'UNITED STATES OF AMERICA NUCLEAR REGULATOPY COMMISSION BEFORE THE ATOMIC'AFETY AND LICENSING'OARD In the Matter of ) Docket Nos. 50-250-SP

) 50-251-SP FLORIDA POWER 6 LIGHT COMPANY )

) Proposed Amendments to (Turkey Point Nuclear ) Facility Operating License Generating Units Nos. 3 ) to Permit Steam Generator and 4) ) Repairs)

AFFIDAVIT OF F. G.. FLUGGER My name is Frederick G. Flugger. My business address is 9250 West Flagler Street, Miami, Florida 33152. I am Manager of Plant Engineering .Licensing, Power Plant Engineering Department, Florida Power E Light Company '(FPL or Licensee).

A statement of my professional .background and qualifications has been previously provided'ith the '"Affidavit of Frederick G.

Flugger and H. H. Jabali on Contention 4A," which was attached to ","..icensee's Answer Supporting NRC Staff Motion for Summary Disposition of Contention 4A" (April 17, 1981).

The purpose of this Affidavit is to respond to the Order of the Licensing Board dated July 28, 1981. This Order referred to the discovery, during preparati'ons for the steam generator replacement, of a void in the concrete in tne containment in the area adjoining and beneath the equipment hatch. It also referred to Section 4.1.2 of the Steam Generator Repair Report (SGRR), which states that the PDR o 6 ag0806 R ADQCK 9 05000250

'DR

lt steam generator lower assemblies (SGLAs) will be removed through the equipment hatch and that "No modifications impacting the integrity of the equipment hatch as a pressure boundary structure are contemplated at this time." The, Board'then posed the following questions:

l. How was the void in the containment wall d'iscovered?
2. Did the discovery result from breaching of the containment wall, or in some other fashion?

3.. If the wall was breached, why was the Licensing Board not informed?

4. Should the statemen'ts .of Licensee in the SGRR be considered a commitment,?
5. Plhat has been the role of the NRC Staff in this matter?

Finally, the Order directed th'e Licensee and the NRC Staff to "provide the Board with full information concerning the apparent breaching of the containment wall at Unit 3, including answers to the questions raised in this Order."

Each of the Board's questions is discussed below.

l. How was the void in the containment wall discovered?

The void in the containment wall was discovered during removal and replacement of a portion of the equipment hatch

sleeve in accordance with Sections 3.2.5 of the SGRR. This

/

section states:

"The following structures or portions of structures will be removed to provide a path for the lower assembly (refer to Figures 3.2-4 through 3.2-6 for i;llustration):

A portion of the equipment hatch sleeve at elevation +30'-6". (A small section of the steel sleeve will be replaced with thicker steel to assure load trans-fer to the supporting concrete wall during ingress and egress of heavy equipment. The affected portion of steel to be replaced does not form a part of the containment pressure boundary nor affects the structural integrity of the containment.)"

Copies of the relevant pages of the SGRR (pp. 3-9, 3-9a) are attached for convenience.

Figure l depicts the location of the equipment hatch sleeve and the location of the void. As can be seen from the figure, the equipment hatch sleeve varies in thickness.

In order to assure load transfer during movement of heavy objects (such as an SGLA) through the equipment hatch during the repairs, FPL planned to replace the thin steel portion of the sleeve with a thick steel plate. During removal of a portion of the affected areas of the sleeve, FPL discovered the void in the concrete underlying the plate. The extent of the void was determined by probing, and a larger portion of the plate was subsequently removed to expose the entire void.

The void is not extensive, it was not caused by the repair work, and it was probably formed during construction of Unit 3. It should be noted that upon completion of construction, the containment was subjected to and successfully passed, testing required by the NRC prior to initial operation. Thus, it is reasonable to conclude that the void does not impact upon the integrity of the pressure boundary.

As is apparent from Figure 1, removal and replacement of a'ortion of the thin section of the sleeve does not affect the containment pressure boundary. The containment pressure boundary consists of the internal containment steel liner, the gasketed equipment hatch closure door, and part of the thick section of the steel 'sleeve. The equipment hatch sleeve area involved in the removal and replacement of the

thin section of the sleeve is outside of the containment. pressure boundary. Consequently, no portion of,the containment pressure boundary was modified'r affected by removal of the sleeve. The void is exterior to the containment pressure boundary, and neither the void nor procedures followed for repair of the void will affect the containment pressure boundary. Prior to return of Unit 3 to power, appropriate local leak testing will be con-ducted for areas affected by the steam generator repair activity to ensure integrity of the containment, pressure boundary. See SGRR section 4'.l.2.

The void is localized and not large; it will be repaired; the repair procedure is straight forward; and the void will in no way impact the SGLA repair activity. The NRC has been informed of the existence of the void and will be provided with the data necessary to disposition this matter.

2. Did the discovery result from 'breaching of the containment wall, or i;n. some other fashion'?

As .described above, the discovery of the void did not result from a breach of the containment wall, but instead from removal of a portion of the thin section of the slegve.

There has been no breach of the structural integrity of the containment pressure boundary.

0

3. If the wall was breached, Board not informed?

why was the Licensing Since the wall was not breached, and the void was not caused by the repair work and does not impair the safety of the repairs, it was not thought necessary to inform the Board. However, as indicated in response to Question 5, below, the NRC Staff was advised.

4. Should the statements of Licensee in the SGRR be considered a commitment?

Yes. The SGRR provides the design and safety related

.bases for the repair that, have been reviewed and accepted by NRC. It is the Safety Analysis Report for the repai:r project.

Any deviation from the SGRRh design and safety-related bases would be reviewed by FPL in accordance with the Commission's regulations at 10 CFR 50.59. Any change in the repair g

activity, as discussed in the SGRR, that involves an Unreviewed Safety Question must be approved by NRC.

FPL's statements in the SGRR that the Steam Generator lower assemblies would be removed through the equipment hatch and that no modifications would be made which would impact the integrity of the equipment hatch as a pressure boundary structure may be considered as design bases and are therefore commitments. Any deviations from these commitments (none are contemplated) would be dispositioned in accordance with 10 CFR 5 50.59.

It should be noted that in addition to design and safety-related bases,, the SGRR also contains details relating to the final design and implementing procedures. Such details are provided in the SGRR primarily to demonstrate the feasibility of the repair activity, and to respond to NRC Staff queries. 'These details may be modified during development of the final design, e.g., to accomodate a design approach that results in a lower man-rem exposure, or that is more cost effective. :Ordinarily

,such changes in detail do not involve an Unreviewed Safety Question and may be made in accordance with 10 CFR 5 50.59.

Thus, in all cases the detailed final implementation will comply with the commitments stated in the SGRR. See SGRR, p. 3-1.

5. What has been the role of the NRC Staff in this matter?

The void was first discovered on July 4, 1981, and' quality control and engineering evaluation process was initiated.

By July 10, 1981, enough information was available to determine that the void was reportable. Therefore, by telephone on that day, FPL notified the Office of Inspection and Enforcement for Region II of the existence of the void. This was followed by the submission of a License Event..Report, on July 24,, 1981.

To the best of FPL's knowledge, the NRC Staff is reviewing this situation in accordance with its normal procedures.

In, summary, a pre-existing concrete void was discovered during the course of repair work as described in the SGRR, this work did not entail a breach of the containment pressure boundary or cause the existence of the void, and the existence of the void will not impact the safety of the repair activity.

~,

Figure l Diagram of Equioment Hatch Area+

Pressure Boundary

~ ~

~ ) ~

Sealing

~ g ~

Surface Steel Sleeve Outside Equipment Containment Hatch void Door

\ ~

Inside, Containment

~ ~

~ ~

~ ~

~

~

I ~

~

~

~ ~ ~ ~ Steel Liner 4

~ ~

~

~

Concrete Containment Wall

  • This diagram is not drawn to scale and omits components which are not relevant to the discovery of the void. It represents the configuration at the time of void discovery.

~)

10 FURTHER AFFIANT SAYETH NOT Date:

)

/

jhow,~g G. Flugger (s'rederick STATE OF FL'ORIDA', )

)) SS.

COUNTY OF DADE ')

SWORN to and subscribed before me this 'ir 'ay Notary Public My Commission Expires: 12-05-82

0 ~) P SGRR

g. Service air piping
h. Primary service water piping Location of cut areas for reactor coolant system, main steam system, and main feedwater system are shown on Figures 3.2-1, 3.2>>2, and 3.2-3, respectively. As appropriate the open ends of cut piping will be covered to ensure cleanliness during the repair.

The governing overall code for the steam generator replacement shall be the ASME Section XI, 1977 Edition with addenda through the summer of 1978.

3.2.5 Concrete and Structural Steel The fol'lowing structures or portions of structures within the containment will be removed to provide' path for the lower assembly (refer to Figures 3.2-4 through 3.2-6 for illustration): 4

a. A section of the steam generator "C" shield wall above eleva-tion + 58'or Unit 4. A section of the steam generator "A" shield wall above elevating + 58'or Unit 3.
b. A section of the operating floor concrete at elevation +

a steam generator "A" upper support embed for Unit 58'ncluding 3

and steam generator "C" thrust beam for Unit 4

c. The removable secondary shield wall panels opposite the contain-ment equipment hatch from elevation + 30'-6" to elevation + 58',

and an additional width of secondary shiel'd wall opposite the equipment hatch from elevation + 30'-6" to elevation + 58'.

A portion of the floor framing and grating at elevation +

the equipment hatch 58'bove

e. A portion of the floor framing and removable floor slabs at elevation + 30'-6" at the low point of the equipment hatch The upper portion of the steel stairway near'he equipment hatch opening ge A reinforced grouted pad in the equipment hatch at elevation

+ 30'-6"

h. A portion of the truss system tie rods to allow for clearance of the temporary polax crane trolley. (The truss system was originally utilized in the construction of the containment and does not perform any structural related function at px'esent,)'-9 Revision 7 March 1980

0 I

4

SGRR A portion of the equipment hatch sleeve. at elevation +30'-6".

(A small'ectio'n of the steel sleeve will be replaced with thicker steel to assure load transfer to the supporting concrete wall during ingress and egress of heavy equipment. The affected portion of steel to be replaced does not form a part of the containment pressure boundary nor affects the structural integrity, of the containment.)

3.2.5.1 Removal of Concrete Structures Removal of bulk volumes of containment internal structural concrete will utilize equipment and techniques commercially available. The intent is 3-9a Revision 7 March 1980

I 0 f1+