ML18040A826: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:':0'alXl!t'RO!IQ%Nt$0'a>vAQ)~xc~IllQIQI4OOOlu'"QOO,y,'au<;XIc=INSTRUMENT
{{#Wiki_filter:':
~REQUIREDNUMBER*OFCHANNELSMINIMUMCHANNELSOPERABLETABLE3.3.7.5-1 ACCIDENTMONITORINGINSTRUMENTATION ACTIONAPPLICABLE OPERATIONAL CONDITION l.ReactorVesselSteamDompPressure2.ReactorVesselMaterLevel3.Suppression ChamberMaterLevel4.Suppression ChamberMaterTemperature 5.Suppression ChamberAirTemperature 6.PrimaryContainment Pressure7.Drywe)1Temperature 8.OrwellGaseousAnalyzera.Oxygenb.Hydrogen9.Safety/Relief ValvePositionIndicators 10.Containment HighRadiation ll.Noblegasmonitors"*
0'alXl!
a.ReactorBldg.Ventb.SGTSVentc.TurbineBldg.Vent12.NeutronFlux2228,6locations 22/range2241/valve"21116,1/location 11/range11/valve*180l808080808080'ba,e2-8280818181'18012l1,21,21,2.1,21,21,21P,2IIM',2II1,21,21,2and*""1,2and"*"121,2,OC)~Acoustic monitor.**Mid-range andhigh-range channels"*"Whenmovingirradiated fuelinthesecondary containment.
t
IISeeSpecialTestException 3.10.174/OPCjll~n~
    'RO!
6fgcrn~gpAocfog~oniyoria'Absuu%w~~OgeCtmf(CnQvf~igCohS~Ig~nc(foA'egfAis~/K(I~~,
IQ
TABLE4.3.7.5-1 ACCIDENTHONITORING INSTRllMEHTATION SURVEILLANCE REUIREHEATS CHANNELCHECKCHANNELCALIBRATIOH INSTRUMENT l.ReactorVesselSteamDomePressure"2.ReactorVesselWaterLevel3.Suppression ChamberMaterLevel4.Suppression ChamberMaterTemperature'.
    %N t$ 0' a> ~  v                                                      TABLE  3.3.7.5-1 AQ) xc ~   Ill ACCIDENT MONITOR I NG INSTRUMENTATION QIQI 4 OO Olu'                                                                                     MINIMUM                      APPLICABLE "QOO,
Suppression ChamberAirTemperature 6.PrimaryContainment Pressure7.DrywellTemperature 8.DrywellOxygen/Hydrogen Analyzer~
,'au<       y
9.Safety/Relief ValvePositionIndicators 10.Containment HighRadiation ll.Noblegasmonitorsa.ReactorBldg.Ventb.SGTSVentRRRRRRRQ*RRHHHHMHHHHHHRc.TurbineBldg.VentHR12.NeutronFluxMR(~ecoythepeepleee/+<ee~eel~)orhydrogenanayzer~usesamplegascontaining:
                                                            ~ *REQUIRED  NUMBER              CHANNELS                      OPERATIONAL
a.Nominalzerovolume'percenthydrogen, balancenitrogen.
;XI        c=
b.Nominalthirtyvolumepercenthydrogen, balancenitrogen.
INSTRUMENT                                       OF CHANNELS                OPERABLE          ACTION        CONDITION
*"CHANNEL CALIBRATION shallconsistofanelectronic calibration ofthechannel,notincluding thedetector, forrangedecadesabove10R/hrandaonepointcalibration checkofthedetectorbelow10R/hrwithan.installed orportab'le gammasource.eWg$ykc]prylan/p~
: l. Reactor Vessel Steam Domp Pressure              2                        1 l
a(per/pnfg nerfgskingccfi(i+Mz
80      1  2
~n4Pftep're@
: 2. Reactor Vessel Mater Level                      2                        1                80      l1,  2
6'@+t~~nQ~jrrr~CM<dCCqCrg&rro&
: 3. Suppression   Chamber  Mater Level              2                        1                80      1, 2
ggrp(/deyCrfir~eg P+h.lire'+4reg~rr-J TABLE3.3.7.5-1 ACCIDENTHOHITORINGIHSTRUHENTAT IONINSTRUHENT 1.ReactorVesselSteamDomePressure2.ReactorVesselWaterLevel3.4.5.6.7.8.Suppression ChamberMaterLevelSuppression ChamberMaterTemperature Suppression ChamberAirTemperature PrimaryContainment PressureDrywellTemperature OrwellGaseousAnalyzera.Oxygenb.Hydrogen9.Safety/Relief ValvePositionIndicators 10.Containment HighRadiation ll.Noblegasmonitors*"
: 4. Suppression Chamber Mater Temperature        8, 6 locations          6, 1/location       80      1, 2
a.ReactorBldg.Ventb.SGTSVentc.TurbineBldg.Vent12.PrimaryContainment Isolation ValvePosition13.NeutronFluxREQUIREDNUHBEROFCHANNELS8,6locations 22/range22cS:A1/valve"11/valveMINIHlJHCHANNELSOPERABLE6,1/location 11/range11/valve"1/valveACTION80808080808080W828280818181818080APPLICABLE OPERATIONAL CONDITIONS 1,21,21,21,21,21,21,21,&#xb9;2&#xb9;1,&#xb9;2&#xb9;1,21,21,2and"""2and%**1,2and"""1,21,2"Acoustic monitor.""Hid-range andhigh-range channels.
: 5. Suppression Chamber Air Temperature              2                        1               80      .1, 2
***Whenmovingirradiated fuelinthesecondary containment.
: 6. Primary Containment Pressure                2/range                  1/range              80      1, 2
&#xb9;SeeSpecialTestException 3.10.1.j7~(~~cZ(/CDnok.Ag~ofIhOaefOI'i~
: 7. Drywe)1 Temperature                              2                        1                80      1, 2
'4tS~~~~C~CeI~P4~>IS~ScancgVn/*~<~~,regCcir~M.
: 8. Orwell  Gaseous    Analyzer
: a. Oxygen                                      24                                        'ba, e2-  1P, 2II M', 2II 9.
10.
: b. Hydrogen Safety/Relief Valve Position Indicators Containment High Radiation 1/valve" 2
1/val ve*
1 82 80 81 1, 2 1, 2 ll. Noble gas monitors"*
: a. Reactor Bldg. Vent                                                                      81      1, 2 and  *""
: b. SGTS Vent                                                                              81      1, 2 and  "*"
                                                                                                                    '1
: c. Turbine Bldg. Vent                                                                              1  2
: 12. Neutron Flux                                                                                80      1, 2
                  ~Acoustic monitor.
                **Mid-range and high-range channels O    "*"When moving    irradiated fuel in the secondary containment.
C)
IISee Special 74 Test Exception 3. 10. 1
                        /OPCjll~n~ 6fgcrn~ gpAocf og ~oniyori        a 'Abs  uu%w~~ I  OgeC  tmf (CnQvf~ ig  CohS    ~
g~nc(      fo    A'eg f Ais ~/K(I~~,


CACACtllTABLE4.3.7.5-1 ACCIOENTHONITORING INSTRUHENTATION SURVEILLANCE REUIREHENTS IRSTRUHEHT CHANNELCHECKCHANNELCALIBRATION GPaCCa)2.3.4.5.6.7.8.9.10.12.13.ReactorVesselSteaiOomePressureReactorVesselMaterLevelSuppression ChamberMaterLevelSuppression ChamberMaterTeimperature Suppression ChamberAirTemperature PrimaryContainment PressureOrywellTemperature OrywellOxygen/Hydrogen Analyzer~.Safety/Relief ValvePositionIndicators Containment HighRadiation Noblegasmonitorsa..ReactorBldg.Ventb.SGTSVentc.TurbineBldg.VentPrimaryContainment Isolation ValvePositionNeutronFluxRRRRRRRqARR**RRRNAR(lsg,fgytfgc,)ref(cHlh+4ERl~A+wA~ocif*ForhydrogenanalyzerPusesamplegascontaining:
TABLE  4.3.7.5-1 ACCIDENT HONITORING INSTRllMEHTATION SURVEILLANCE RE UIREHEATS CHANNEL            CHANNEL INSTRUMENT                                                                        CHECK          CALIBRATIOH
ta.Nominalzerovolumepercenthydrogen, balancenitrogen.
: l. Reactor Vessel Steam Dome Pressure                  "                        H                  R
b.Nominalthirtyvolumepercenthydrogen, balancenitrogen.
: 2. Reactor Vessel Water Level                                                    H                  R
*"CHANNEL CALIBRATION shallconsistofanelectronic calibration ofthechannel,notincluding thedetector, forrangedecadesabove1OR/hrandaonepointcalibration checkofthedetectorbelow1OR/hr>>thaninstalled orportablegammasource.~~~/<<,g~(qcye~c.~sskc<~ST'Rl<Ww~pn~r~Ch4~nfdc.
: 3. Suppression Chamber Mater Level                                              H                  R
avEcK~A,~~p<i~4yccag87roJ
: 4. Suppression Chamber Mater    Temperature'.
>A~/Ike1erfor~golt/Te/isles'l'eg~~Ees
H                  R Suppression Chamber Air Temperature                                          M                  R
.
: 6. Primary Containment Pressure                                                  H                  R
~Ct)CCAADmTABLE3.3.7.5-1 ACCIDENTHONITORING INSTRUMENTATION INSTRUHENT
: 7. Drywell Temperature                                                            H                  R
~REQUIREDNUMBEROFCHANNELSHINIHUMCHANNELSOPERABLEACTIONAPPLICABLE OPERATIONAL
: 8. Drywell Oxygen/Hydrogen Analyzer~                                             H                  Q*
~CONDITION 2.3.4.6.7.8.9.10.11.ReactorVesselSteamDomoPressureReactorVesselMaterLevelSuppression ChamberMaterLevelSuppression ChamberMaterTemperature Suppression ChamberAirTemperature PrimaryContainment PressureDrywellTemperature DrywellGaseousAnalyzera.Oxygenb.HydrogenSafety/Relief ValvePositionIndicators Containment HighRadiation Noblegasmonitors""
: 9. Safety/Relief Valve Position Indicators                                        H                  R
a.ReactorBldg.Ventb.SGTSVentc.TurbineBldg.Vent228,6locations 22/range22882k'/valve" 16,1/location 11/range11I'III1H1/valve"180l808080808080828280818181'11,2)lq21,212.1,21,21,2lP,2h'8,2II'.2121,2and*"*1,2and"**1212.NeutronFlux8012OCD"Acoustic monitor."*Hid-range andhigh-range channels""*Mhenmovingirradiated fuelinthesecondary containment.
: 10. Containment High Radiation                                                    H                  R ll. Noble gas monitors
DSeeSpecialTestException 3.10.1HThepreplanned alternate methodofmonitoring thisparameter, once"channel" tomeetthisrequirement.
: a. Reactor Bldg. Vent
implemented, isconsidered avalid TABLE4.3.7.5-l ACCIDENTMONITORING INSTRUMENTATION SURVEILLANCE REUIREMEATS INSTRUMENT 1.ReactorVesselSteamDomePressure'.ReactorVesselMaterLevel3.Suppression ChamberMaterLevel4.Suppression ChamberMaterTemperature 5.Suppression ChamberAirTemperature 6.PrimaryContainment Pressure7.DrywellTemperature 8.DrywellOxygen/Hydrogen Analyzers 9.Safety/Relief ValvePositionIndicators 10.Containment HighRadiation 11.Noblegasmonitorsa.ReactorBldg.Ventb.SGTSVentCHANNELCHECKCHANHELCALIBRATIONRRRRRRR*RRA%OMMc.TurbineBldg.Vent12.NeutronFlux!orhydrogenanayzer~(but notthepreplanned alternate method),usesample'as containing':
: b. SGTS Vent                                                                  H                  R
a.Hominalzerovolume'percent
: c. Turbine Bldg. Vent                                                        H                  R
: hydrogen, balancenitrogen.
: 12. Neutron Flux                                                                  M                  R
b.Nominalthirtyvolumepercenthydrogen, balancenitrogen.
(~e  coy the peeplee          e/ +<ee~ eel~)
"*CHANNEL CALIBRATION shallconsistofanelectronic calibration ofthechannel,notincluding thedetector, forrangedecadesabove10R/hrandaonepointcalibration checkofthedetectorbelow10R/hrwithaninstalled orportablegammasource.8Ifthepreplanned alternate methodisbeingutilized, anappropriate CHANNELCHECKandanappropriate CHANNELCALIBRATION shallbeperformed atthelistedfrequencies.
or hydrogen ana yzer~ use sample gas containing:
TABLE3.3.7.5-1 ACCIDENTHONITORING INSTRUHENTATION CMtOINSTRUHENT 1.ReactorVesselSteamDomePressure2.ReactorVesselMaterLevel3.Suppression ChamberMaterLevel4.Suppression ChamberWaterTemperature 5.Suppression ChamberAirTemperature 6.PrimaryContainment'Pressure 7.DrywellTemperature 8.DrywellGaseousAnalyzer~a.Oxygenb.Hydrogen9.Safety/Relief ValvePositionIndicators 10.Containment HighRadiation 11.Noblegasmonitors"*
: a. Nominal zero volume 'percent hydrogen, balance nitrogen.
a.ReactorBldg.-Ventb.SGTSVentc.TurbineBldg.Vent12.PrimaryContainment Isolation ValvePosition13.NeutronFluxREQUIREDNUHBEROFCHANNELS8,6locations 22/range22yy2kTI'1/va1ve"211/valveHINIHUMCHANNELSOPERABLE6,1/location 11/range11H1/valve*11/valve1ACTION80808080808080828280818181818080APPLICABLE OPERATIONAL CONDITIONS 1,21,21,21,21,21,21,2l,f281,8281,21,212and*"*and*A'42and1,21,2*Acoustic monitor."*Hid-range andhigh-range channels.
: b. Nominal thirty volume percent hydrogen, balance nitrogen.
"*"Whenmovingirradiated fuelinthesecondary containment.
*"CHANNEL CALIBRATION shall consist of an electronic calibration of the channel, not including the detector, for range decades above 10 R/hr and a one point calibration check of the detector below 10 R/hr with an .
gSeeSpecialTestException 3.10.1.HThepreplanned alternate methodofmonitoring thisparameter, onceimplemented, isconsidered avalid"channel"tomeetthisrequirement..
installed or portab'le gamma source.                                                         e W g$    ykc ]prylan/p~ a(per/pnfg  nerf                gs  king ccfi(i+Mz ~n 4Pftep're@ 6' @ +t ~ ~n  Q~jrrr~
~I
CM<dC CqCrg&rro& ggrp(/ de                    yCrfir~eg P +h. lire'+ 4reg~rr-J


TABLE4.3.7.5-1 ACCIDENTMONITORING INSTRUMENTATION SURVEILLANCE REUIREHENTS INSTRUMENT 1.ReactorVesselSteamDomePressure2.ReactorVesselMaterLevel3.Suppression ChamberMaterLevel4.Suppression ChamberMaterTemperature
TABLE  3.3.7.5-1 ACCIDENT HOHI TOR ING IHSTRUHENTATION MINIHlJH                APPLICABLE REQUIRED NUHBER        CHANNELS                OPERATIONAL INSTRUHENT                                              OF CHANNELS        OPERABLE        ACTION  CONDITIONS
-5.Suppression ChamberAirTemperature 6.PrimaryContainment Pressurel.DrywellTemperature 8.DrywellOxygen/Hydrogen Analyzerg9.-Safety/Relief ValvePositionIndicators 10.Containment HighRadiation 11.Noblegasmonitorsa.ReactorBldg.Ventb.SGTSVentc.TurbineBldg.Vent'12.PrimaryContainment Isolation ValvePosition13.HeutronFluxCHANNELCHECKHHHHHMHHHMHHHCHANNELCALIBRATION
: 1. Reactor Vessel Steam Dome Pressure                                                      80    1, 2
"'RRRRRRRQA'R*A'RNAR"Forhydrogenanalyzer,(but notthepreplanned alternate method),usesamplegascontaini'na; Ia.Hominalzerovolumepercenthydrogen, balancenitrogen.
: 2. Reactor Vessel Water Level                                                              80    1, 2
-b.Nominalthirtyvolumepercenthydrogen, balancenitrogen.
: 3. Suppression Chamber Mater Level                                                        80    1, 2
""CHANNEL CALIBRATION shallconsistofanelectronic calibration ofthechannel,notincluding thedetector, forrangedecadesabove10R/hrandaonepointcalibration checkofthedetectorbelow10R/hrwithaninstalled orportablegammasource.glfthepreplanned alternate methodisbeingutilize'd, anappropriate CHANNElCHECKandanappropriate CHANNELCALIBRATION shallbeperformed atthelistedfreauencies.
: 4. Suppression Chamber Mater Temperature            8,  6  locations    6, 1/location    80    1, 2
SSES-FSAR recombiners arelocatedapproximately midwaybetweenthepedestalandcontainment wall.Thesuppression chamberrecombiners bothhavestructures locatedclosetotwo.oftherecombiner ports.Bothrecombiners havea42inchdiameterdiaphragm slabsupportcolumnapproximately 1-1/2feetfromthesuction,anda24inchbeamapproximately 6inchesfromthe26inchhighdischarge.
: 5. Suppression Chamber Air Temperature                      2                1            80    1, 2
Thehydrogenrecombiner isanaturalconvection, flameless, thermalreactor-type hydrogen/oxygen recombiner.
: 6. Primary Containment Pressure                        2/range            1/range        80    1, 2
Theinitiation timefortherecombiners ispriorto1.2days,post-LOCA asshowninFigures6.2-49,6.2-50and6.2-51.Theheat-uptimeisapproximately 4hours.Therefore, recombiner heat-upwillbeginapproximately 4hourspriortooperation.
: 7. Drywell Temperature                                      2                1            80    1, 2
Therecombiner heatsacontinuous streamofcontainment atmosphere toatemperature sufficient forrecombination ofthehydrogenandoxygen,to formwater.Therecombination unitconsistsofaninletpreheater section,aheater-recombination section,andamixingchamber.Theairisdrawnintotheunitbynaturalconvection viatheinletlouversandpassesthroughthepreheater section,which'consists ofashroudplacedaround,thecentralheaterstotakeadvantage ofheatconduction throughthewalls.Inthisareathetemperature oftheinletairisraised.Thisaccomplishes thedualfunctionofincreasing thesystemefficiency andofevaporating anymoisturedropletswhichmaybeentrained intheair.Thewarmedairthenpassesthroughthefloworificewhichhasbeenspecifically sizedtoregulatetheairflowthroughtheunit.Afterpassingthroughtheorificeplate,theairflowsvertically upwardthroughtheheatersection,whereitstemperature israisedtotherangeof1150-1400 F,causingrecombination ofH2and02tooccur.Therecombination temperature isapproximately 1135~8.Theheatersectionconsistsoffivebanksofelectricheatersstackedvertically.
: 8. Orwell Gaseous Analyzer
Eachbankcontains60individual U-typeheatingelements.
: a. Oxygen                                                                            W  82  1,&#xb9; 2&#xb9; cS:A
Next,theairrisesfromthetopoftheheatersectionandflowsintothemixingchamber,whichisatthetopoftheunit.Here,thehotairismixedwiththecoolercontainment airtodischarge itbackintothecontainment atalowertemperature.
: b. Hydrogen                                            2                              82    1,&#xb9; 2&#xb9;
Thecoolercontainment airentersthemixingchamberthroughthelowerpartoftheupperlouverslocatedonthreesidesoftheunit."Table6.2-18givesthedesigncharacteristics ofthehydrogeniecombiner.
: 9. Safety/Relief Valve Position Indicators              1/val ve"      1/valve"          80    1, 2
Rev.36,07/856.2-71 EO"200-103Reiision0Page17of33PC/P-4IF:THEN:0H2CONCENTRATION
: 10. Containment High Radiation                                                              81    1, 2 ll. Noble gas monitors*"
>3%BYVOLUMEOR24HOURSHASELAPSEDSINCE1.72PSIGSIGNAL,STARTH2RECOMBINERS IAWOP-273"001 RUNDWCOOLERSINSLOWIAWES-234-001 Thisstepbecomeseffective whenreadandremainseffective untilflowchart exited.Ignitionofcombustible gases(hydrogen andoxygen)couldresultinsignificant containment pressuretransients, leadingtocontainment failure.ThisWillnotoccurifcontainment hydrogenconcentration ismaintained below4%.Therefore, starthydrogenrecombiners at3%concentration.
: a. Reactor Bldg. Vent                                                                81    1, 2 and"""
Rundrywellcoolersinslowtoavoidpocketswithhighhydrogenconcentrations.
: b. SGTS Vent                                                                          81        2 and%**
Startbothsystemsalsoafter24hourshaselapsedfromreceiptofLOCAsignaltocounteract buildupofcombustible gasduetoradiolysis.
: c. Turbine Bldg. Vent                                    1                            81    1, 2 and"""
Securehydrogenrecombiners priortoinitiating containment sprays.pc/p-5(PC/P-1)REDUCEPCPRESSUREUSING:oSBGTIAWON-234-001, ONLYWHENDWANDSUPPCHAMBERTEMP<212FoRPVDEPRESSURIZATION ANDCOOLDOWNIAWRPVCONTROLoES"234-001, BYPASSING DRYWELLCOOLING'OGIC ISOLATIONS Reducecontainment pressureusinglistedprocedures.
: 12. Primary Containment Isolation Valve Position        1/valve          1/valve          80    1, 2
Theseprocedures accountfor1.72psigisolations.
: 13. Neutron Flux                                                                            80    1, 2 "Acoustic monitor.
InitiateRPVdepressurization andcooldown'in accordance withE0-200-102, RPVControl,performed concurrently withthisprocedure.
""Hid-range and high-range channels.
UseSBGTonlyifprimarycontainment temperatures arebelow212~F:Iftemperature isabove212F,steammaybeadmittedtocontainment.
***When moving irradiated fuel in the secondary containment.
Continued useofSBGTwouldeventually reducecontainment's non-condensible airmassandpreventusingdrywellsprays.pc/p-eBEFOREDWORSUPPCHAMBERPRESSUREREACHES0PSIG,-TERMINATE PRESSUREREDUCTION Thisstepbecomeseffective whenreadandremainseffective untilflowchart exited.Itgivesappropriate timetostoppressurereduction, whatevermeansemployed(i.e.SBGTorsprays).Stoppressurereduction atthispointtopreventcontainment failureonnegativepressure.
  &#xb9;See Special Test Exception 3. 10. 1.
0 RRCLIMITSEXPERIMENT PETONABLFLAMMABLE AIRNON-FLAMMABLE
j7~(~~ cZ(/CD nok. Ag~    of IhOaefOI'i~ '4tS  ~~~~        C~Ce I~P4  ~>    IS ~Scan cg Vn/
$%O~20Figure1.COMBUSTION CHARACTERISTICS OFH>INAIRANDSTEAM Q~~CCOMBUSTIBLE 40NONFLAMMABLE
    *    ~<~  ~,    reg Ccir~M .
.00230AIRRAOIOLYSIS METAL-WATER RECOMBINATION INERTFigure2MITIGATIONOFDEGRADEDCOREENVIRONMENT BYRECOMBINA TION 4TOTALRADIOLYSIa1504W44'1004,ILR84.XSO~yye~Priul~eed (Ih-<<le)METALWATERREACTIONPlUSINITIALHYDROGEN1020TIMEAFTERLOCAIDAYSIRev.350784SUSCNEHANNA STEANELECTRICSTATIONUNITS1AND2FINALSAFETYANALYSNREPORTINTEGRATED PRODUCTION OFHYDROGENVS.TIMEAFTERLOCAFIGURE6.2-4.8 I
 
8C1NCCIICIV~JAXOpN3008OAHLNBQBBdBWllOA Rev.3507/84~SUSQUEHANNA STEAMELECTRICSTATIONUNITS1AND2FINALSAFETYANALYSISREPORTHYDROGENCONCENTRATION INTHE.DRYNELL VS.TIMEAFTERLOCA(SHORTTERM)BOURS"6'2-50 I1?F1~ATTACQIENT 6ICOIIThISKHT HYOROGENMONITORIAcontinuous.'fndication ofhydrogenconcentration inthecontainment atjaosphcrc shallbeprovidedinthecontrolrooa.Hcasurcacnt capability shallbcprovidedovertherangeof0to10Khydrogenconcentration underbothpositiveandnegativeaablentpressure.
CA CA                                                              TABLE  4.3.7.5-1 tll C
ChastoPrevfousRufreaents andGuidanceRegulatory Gufde1.9>,Rev.2wasreferenced intheOctober30,1979letterastheguideforthedesignandqualification crfterfaforthecontafnecnt hydrogenmonitor.However,therehavebeenaanychangesaadetothisproposedrevisionandfthasnotyetbeensadeffw.'..Therefore, theappropriate sectionsofttwlatestversionofRegulatory Guide1.97havebeenaddedtothisletter(Appendix A)and,therefore, thisfstobeconsidered ancwrcqufreeent.
ACCIOENT HONITORING INSTRUHENTATION SURVEILLANCE RE UIREHENTS CHANNEL                  CHANNEL IRSTRUHEHT                                                            CHECK                CALIBRATION Reactor Vessel Steai Oome Pressure                                                        R
Thef~ltaentatfon datehasbeenchangedduetocqufpoent procurcacnt probleas.
: 2. Reactor Vessel Mater Level                                                                R
Thenewfepleaentation scheduleisintendedtoallowlicensees enoughtiaetocoepletedesignmodifications withaafnfauanueberofplantshutdowns.
: 3. Suppression Chamber Mater Level                                                          R
Clarification (1).DesignandqualifIcitfoncrfterfaareoutlinedfnAppendixA.'2)Ttwcontinuous fr.)ication ofhydrogenconcentration Isnotrequiredduringnoraaloperation.
: 4. Suppression Chamber Mater Teimperature                                                    R
lfanfndfcatfon fsnotavailable atalltfees,continuous indicatfon andrecording shallbefunctioning within30afnutesoftheinitiation ofsafetyinfection.
: 5. Suppression Chamber Air Temperature                                                      R
(3)Ttwaccuracyandplaceeent ofthehydrogeneonftorsshallbeprovidedand)ustified tobeadequatefortheirintendedfunctfon.
: 6. Primary Containment Pressure                                                              R GP
Tt::wqufrccwnt appliestoaltoperatfng reactorsandallapplicants foroperating licenses.
: 7. Orywell Temperature a                                                                                                    R C
Ilceentatfon Foroperating
: 8. Orywell Oxygen/Hydrogen Analyzer        ~                                                qA Ca)  9. .Safety/Relief Valve Position Indicators                                                    R
: reactors, desfgnaodfffcatfons shouldbecoapleted byJanuary1,1982.Operating licenseapplicants withanoperating licensedatebeforeJanuary1,1982esthavedesignchangescoapleted byJanuary1,1982,whereasthoseapplicants withlicensedatespastJanuary1,1982austhavealldesignoodfff-catfonscoapletcd beforetheycanrccefvetheiroperating license.3-111 1Ittla*~}}
: 10. Containment High Radiation                                                                  R**
Noble gas monitors a.. Reactor Bldg. Vent                                                                    R
: b. SGTS Vent                                                                          R
: c. Turbine Bldg. Vent                                                                  R
: 12. Primary Containment Isolation Valve Position                                                NA
: 13. Neutron Flux                                                                                R (lsg,f gyt fgc, )ref (cHlh+4 l~A+ wA~ocif ER
    *For hydrogen analyzer P use sample gas containing:
: a. Nominal zero volume percentt hydrogen, balance nitrogen.
: b. Nominal thirty volume percent hydrogen, balance nitrogen.
    *"CHANNEL CALIBRATION shall consist of an electronic for range decades above 1O R/hr and a one point calibration      calibration of the channel, not including the detector, check of the detector below 1O R/hr>>th an installed or portable gamma source.
                  ~~~/<<,g 4yccag87roJ
                            ~(qc
                      >A~/I ke 1 ye  ~c.~
erfor~g ol ss  kc<~ ST'Rl<W t/Te w ~pn~r~
                                                            /isles'l'eg~~Ees    .
Ch4~nfdc. avEcK  ~    A, ~~p<i~
 
~ Ct)
C CA AD                                                  TABLE    3.3.7.5-1 m
ACCIDENT HONITORING INSTRUMENTATION INSTRUHENT
                                                ~ REQUIRED    NUMBER OF CHANNELS HINIHUM CHANNELS OPERABLE        ACTION APPLICABLE OPERATIONAL CONDITION
                                                                                                                        ~
Reactor Vessel Steam Domo Pressure            2 l
80        1,  2
: 2. Reactor Vessel Mater Level                                                          80      )lq  2
: 3. Suppression Chamber Mater Level                2                    1              80        1, 2
: 4. Suppression Chamber Mater Temperature      8, 6 locations        6, 1/location      80        1  2 Suppression Chamber Air Temperature            2                    1              80      .1,  2
: 6. Primary Containment Pressure              2/range              1/range            80        1, 2
: 7. Drywell Temperature                            2                    1              80        1, 2
: 8. Drywell Gaseous Analyzer
: a. Oxygen                                    288                  1 I'III        82        lP, 1H 2h'8,
: b. Hydrogen                                                                      82              2II'.
2k'/valve"
: 9. Safety/Relief Valve Position Indicators                          1/valve"          80            2
: 10. Containment High Radiation                                          1              81        1  2
: 11. Noble gas monitors""
: a. Reactor Bldg. Vent                                                              81        1, 2 and    *"*
: b. SGTS Vent                                                                      81        1, 2 and    "**
                                                                                                  '1
: c. Turbine Bldg. Vent                                                                        1  2
: 12. Neutron Flux                                                                        80        1  2 "Acoustic monitor.
        "*Hid-range and high-range channels O  ""*Mhen moving irradiated fuel in the secondary containment.
DSee Special Test Exception 3. 10.1 CD HThe preplanned alternate method of monitoring this parameter, once implemented, is considered a  valid "channel" to meet this requirement.
 
TABLE  4.3.7.5-l ACCIDENT MONITORING INSTRUMENTATION SURVEILLANCE RE UIREMEATS CHANNEL                    CHANHEL INSTRUMENT                                                     CHECK                    CALIBRATION
: 1. Reactor Vessel Steam Dome Pressure                                                      R Reactor Vessel Mater Level                                                              R
: 3. Suppression Chamber Mater Level                                                          R
: 4. Suppression Chamber Mater Temperature                                                    R
: 5. Suppression Chamber Air Temperature                                                      R
: 6. Primary Containment Pressure                                                            R
: 7. Drywell Temperature                                                                      R
: 8. Drywell Oxygen/Hydrogen Analyzers                                                          *
: 9. Safety/Relief Valve Position Indicators                                                  R
: 10. Containment High Radiation                                                              RA%
: 11. Noble gas monitors
: a. Reactor Bldg. Vent
: b. SGTS Vent
: c. Turbine Bldg. Vent                                      M
: 12. Neutron Flux                                                M or hydrogen ana yzer~(but not the preplanned alternate method), use sample'as containing':
: a. Hominal zero volume'percent hydrogen, balance nitrogen.
: b. Nominal thirty volume percent hydrogen, balance nitrogen.
  "*CHANNEL CALIBRATION shall consist of an electronic calibration of the channel, not including the detector, for range decades above 10 R/hr and a one point calibration check of the detector below 10 R/hr with an installed or portable gamma source.
8If the preplanned alternate method is being utilized, an appropriate CHANNEL CHECK and an appropriate CHANNEL CALIBRATION shall be performed at the listed frequencies.
O
 
TABLE 3.3.7.5-1 ACCIDENT HONITORING INSTRUHENTATION HINIHUM                    APPLICABLE REQUIRED NUHBER      CHANNELS                    OPERATIONAL INSTRUHENT                                              OF CHANNELS        OPERABLE      ACTION      CONDITIONS C
: 1.      Reactor Vessel Steam Dome Pressure                                                  80        1, 2 M
: 2.      Reactor Vessel Mater Level                                                          80        1, 2 tO
: 3.      Suppression Chamber Mater Level                                                    80        1,  2
: 4.      Suppression Chamber Water Temperature          8, 6 locations    6, 1/location    80        1,  2
: 5.     Suppression Chamber Air Temperature                  2              1            80        1,  2
: 6.     Primary Containment'Pressure                      2/range            1/range        80        1,  2
: 7.     Drywell Temperature                                  2              1            80        1,  2
: 8.     Drywell Gaseous Analyzer
        ~
: a. Oxygen                                            2yy                          82        l,f 28
: b. Hydrogen                                         2kTI            1H            82        1,8 28
: 9.     Safety/Relief Valve Position Indicators            '1/va1 ve"      1/val ve*        80        1, 2
: 10. Containment High Radiation                            2                            81        1, 2
: 11. Noble gas monitors"*
: a. Reactor Bldg.- Vent                                                            81        1  2 and*"*
: b. SGTS Vent                                                                        81              and*A'4
: c. Turbine Bldg. Vent                                   1            1            81            2 and
: 12. Primary Containment Isolation Valve Position      1/valve          1/valve          80        1, 2
: 13. Neutron Flux                                                          1            80        1, 2
      *Acoustic monitor.
    "*Hid-range and high-range channels.
  "*"When moving irradiated fuel in the secondary containment.
gSee Special Test Exception 3.10.1.
HThe preplanned alternate method of monitoring this parameter,      once implemented, is considered  a  valid
      " channel" to meet this requirement..
                                    ~I
 
TABLE 4.3.7.5-1 ACCIDENT MONITORING INSTRUMENTATION SURVEILLANCE RE UIREHENTS CHANNEL              CHANNEL INSTRUMENT                                                  CHECK              CALIBRATION
: 1. Reactor Vessel Steam Dome Pressure                    H                    "'R
: 2. Reactor Vessel Mater Level                            H                      R
: 3. Suppression Chamber Mater Level                      H                      R
: 4. Suppression Chamber Mater Temperature                H                      R
-5. Suppression Chamber Air Temperature                  H                      R
: 6. Primary Containment Pressure                          M                      R
: l. Drywell Temperature                                                          R
: 8. Drywell Oxygen/Hydrogen Analyzer g                      H                    QA'
: 9. -Safety/Relief Valve Position Indicators
: 10. Containment High Radiation                                H                      R*A'
: 11. Noble gas monitors
: a. Reactor Bldg. Vent                              H
: b. SGTS Vent                                      M
: c. Turbine Bldg. Vent H                      R
: 12. Primary Containment Isolation Valve Position          H                      NA
: 13. Heutron Flux                                          H                      R "For hydrogen analyzer,(but not the preplanned alternate method), use sample gas containi'na; I
: a. Hominal zero volume percent hydrogen, balance nitrogen.
      -b. Nominal thirty volume percent hydrogen, balance nitrogen.
""CHANNEL CALIBRATION shall consist of an electronic calibration of the channel, not including the detector, for range decades above 10 R/hr and a one point calibration check of the detector below 10 R/hr with an installed or portable gamma source.
glf the preplanned alternate method is being utilize'd, an appropriate CHANNEl CHECK and an appropriate CHANNEL CALIBRATION shall be performed at the listed freauencies.
 
SSES-FSAR recombiners are located approximately midway between the pedestal and containment wall.
The suppression chamber recombiners both have structures located close to two. of the recombiner ports. Both recombiners have      a 42 1-1/2 inch diameter  diaphragm slab  support  column approximately feet from the suction, and a 24 inch beam approximately 6 inches from the 26 inch high discharge.
The hydrogen recombiner  is a natural convection, flameless, thermal reactor-type hydrogen/oxygen recombiner. The initiation time for the recombiners is prior to 1.2 days, post-LOCA as shown in Figures 6.2-49, 6.2-50 and 6.2-51. The heat-up      time is approximately 4 hours. Therefore, recombiner heat-up will begin approximately 4 hours prior to operation. The recombiner heats a continuous stream of containment atmosphere to a temperature sufficient for recombination of the hydrogen and oxygen,to form water.
The recombination unit consists of an inlet preheater section, a heater-recombination section, and a mixing chamber. The air is drawn into the unit by natural convection via the inlet louvers and passes through the preheater section, which 'consists of a shroud placed around, the central heaters to take advantage of heat conduction through the walls. In this area the temperature of the inlet air is raised. This accomplishes the dual function of increasing the system efficiency and of evaporating any moisture droplets which may be entrained in the air. The warmed air then passes through the flow orifice which has been specifically sized to regulate the airflow through the unit.
After passing through the orifice plate, the air flows vertically upward through the heater section, where its temperature is raised to the range of 1150-1400 F, causing recombination of H2 and 02 to occur. The recombination temperature is approximately 1135~8. The heater section consists of five banks of electric heaters stacked vertically. Each bank contains 60 individual U-type heating elements.
Next, the air rises from the top of the heater section and flows into the mixing chamber, which is at the top of the unit. Here, the hot air is mixed with the cooler containment air to discharge it  back into the containment at a lower temperature.
containment air enters the mixing chamber through    the The cooler lower part of the upper louvers located on three sides of the    unit."
Table 6.2-18 gives the design characteristics    of the hydrogen iecombiner.
Rev. 36, 07/85                  6.2-71
 
EO" 200-103 Reiision  0 Page 17 of 33 PC/P-4    IF:         0    H2 CONCENTRATION > 3% BY VOLUME OR 24 HOURS HAS ELAPSED SINCE 1.72 PSIG SIGNAL, THEN:            START H2 RECOMBINERS IAW OP-273"001 RUN DW COOLERS IN SLOW IAW ES-234-001 This step becomes effective when read and remains effective until flowchart exited. Ignition of combustible gases (hydrogen and oxygen) could result in significant containment pressure transients, leading to containment failure. This Will not occur if  containment hydrogen concentration is maintained below 4%.
Therefore, start hydrogen recombiners at 3% concentration. Run drywell coolers in slow to avoid pockets with high hydrogen concentrations.     Start both systems also after 24 hours has elapsed from receipt of LOCA signal to counteract buildup of combustible gas due to radiolysis. Secure hydrogen recombiners prior to initiating containment sprays.
pc/p-5     REDUCE PC PRESSURE    USING:
(PC/P-1) o    SBGT IAW ON-234-001, ONLY WHEN DW AND SUPP CHAMBER TEMP < 212 F o    RPV DEPRESSURIZATION AND COOLDOWN IAW RPV CONTROL o    ES"234-001, BYPASSING DRYWELL      COOLING'OGIC ISOLATIONS Reduce containment    pressure using listed procedures.         These procedures    account  for 1.72 psig isolations. Initiate RPV depressurization and cooldown'in accordance with E0-200-102, RPV Control, performed concurrently with this procedure.
Use SBGT  only  if primary  containment temperatures are below 212~F:
If temperature    is  above 212 F, steam may be admitted to containment. Continued use of SBGT would eventually reduce containment's   non-condensible air mass and prevent using drywell sprays.
pc/p-e    BEFORE DW OR SUPP    CHAMBER PRESSURE  REACHES 0    PSIG, TERMINATE PRESSURE    REDUCTION This step becomes effective when read and remains effective until flowchart exited. It gives appropriate time to stop pressure reduction, whatever means employed (i.e. SBGT or sprays). Stop pressure reduction at this point to prevent containment failure on negative pressure.
 
0 RRC LIMITS EXPERIMENT FLAMMABLE PETONABL AIR NON-FLAMMABLE
$ % O~
20 Figure 1. COMBUSTION CHARACTERISTICS OF H> IN AIR AND STEAM
 
Q
                                                                                  ~ ~
C NONFLAMMABLE 40 COMBUSTIBLE                                                                    . 0 30 02 AIR INERT RAOIOLYSIS          METAL-WATER RECOMBINATION Figure  2 MITIGA TION OF DEGRADED CORE EN VIRONMENTBY RECOMBINATION
 
4 TOTAL RADIOLYSIa 150 4
W 4
4, 4 '100 IL R
8 4.
X O~yy e~ Priul~eed S
(Ih-<<le)
METALWATER REACTION PlUS INITIALHYDROGEN 10                20 TIME AFTER LOCA IDAYSI Rev. 35      07 84 SUSCNEHANNA STEAN ELECTRIC STATION UNITS 1 AND 2 FINAL SAFETY ANALYSN REPORT INTEGRATED PRODUCTION OF HYDROGEN VS. TIME AFTER LOCA FIGURE    6. 2-4.8
 
I 8
C1 N CCI I
C IV~JAXO p N3008OAHLNBQBBdBWllOA Rev. 35      07/84~
SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1 AND 2 FINAL SAFETY ANALYSIS REPORT HYDROGEN CONCENTRATION        IN THE.DRYNELL VS. TIME AFTER LOCA (SHORT TERM)
BOURS   "6'2-50
 
I 1? F 1 ~ ATTACQIENT 6 I COIIThISKHT HYOROGEN MONITOR I
A  continuous.'fndication of hydrogen concentration in the containment atjaosphcrc shall be provided in the control rooa. Hcasurcacnt capability shall bc provided over the range of 0 to 10K hydrogen concentration under both positive and negative aablent pressure.
Cha    s to Prevfous  R  ufreaents and Guidance Regulatory Gufde 1.9>, Rev. 2 was referenced in the October 30, 1979 letter as the guide for the design and qualification crfterfa for the contafnecnt hydrogen monitor. However, there have been aany changes aade to this proposed revision and ft has not yet been sade ffw.'.. Therefore, the appropriate sections of ttw latest version of Regulatory Guide 1.97 have been added to this letter (Appendix A) and, therefore, this fs to be considered a ncw rcqufreeent.
The f~ltaentatfon date has been changed due to cqufpoent procurcacnt probleas.
The new fepleaentation schedule is intended to allow licensees enough tiae to coeplete design modifications with a afnfaua nueber of plant shutdowns.
Clarification (1) . Design  and qual ifIcitfon crfterfa  are outlined fn Appendix A.'2)
Ttw continuous  fr.)ication of hydrogen concentration  Is not required during noraal operation.
lf an fndfcatfon fs not available at all tfees, continuous indicatfon and recording shall be functioning within 30 afnutes of the initiation of safety infection.
(3)   Ttw accuracy and placeeent of the hydrogen eonftors shall be provided and
      )ustified to be adequate for their intended functfon.
Tt:: wqufrccwnt applies to    alt operatfng reactors  and all applicants for operating licenses.
I lceentatfon For operating reactors, desfgn aodfffcatfons should be coapleted by January 1, 1982.
Operating license applicants with an operating license date before January 1, 1982 est have design changes coapleted by January 1, 1982, whereas those applicants with license dates past January 1, 1982 aust have all design oodfff-catfons coapletcd before they can rccefve their operating license.
3-111
 
1 It tl a
          *~}}

Latest revision as of 14:24, 3 February 2020

Proposed Tech Specs,Allowing Alternate Method of post-accident Drywell Gaseous Sampling & Providing Relief for Unnecessarily Restrictive Action Statement on Drywell Oxygen Analyzer
ML18040A826
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 02/09/1987
From:
PENNSYLVANIA POWER & LIGHT CO.
To:
Shared Package
ML17146A708 List:
References
NUDOCS 8702180499
Download: ML18040A826 (20)


Text

':

0'alXl!

t

'RO!

IQ

%N t$ 0' a> ~ v TABLE 3.3.7.5-1 AQ) xc ~ Ill ACCIDENT MONITOR I NG INSTRUMENTATION QIQI 4 OO Olu' MINIMUM APPLICABLE "QOO,

,'au< y

~ *REQUIRED NUMBER CHANNELS OPERATIONAL

XI c=

INSTRUMENT OF CHANNELS OPERABLE ACTION CONDITION

l. Reactor Vessel Steam Domp Pressure 2 1 l

80 1 2

2. Reactor Vessel Mater Level 2 1 80 l1, 2
3. Suppression Chamber Mater Level 2 1 80 1, 2
4. Suppression Chamber Mater Temperature 8, 6 locations 6, 1/location 80 1, 2
5. Suppression Chamber Air Temperature 2 1 80 .1, 2
6. Primary Containment Pressure 2/range 1/range 80 1, 2
7. Drywe)1 Temperature 2 1 80 1, 2
8. Orwell Gaseous Analyzer
a. Oxygen 24 'ba, e2- 1P, 2II M', 2II 9.

10.

b. Hydrogen Safety/Relief Valve Position Indicators Containment High Radiation 1/valve" 2

1/val ve*

1 82 80 81 1, 2 1, 2 ll. Noble gas monitors"*

a. Reactor Bldg. Vent 81 1, 2 and *""
b. SGTS Vent 81 1, 2 and "*"

'1

c. Turbine Bldg. Vent 1 2
12. Neutron Flux 80 1, 2

~Acoustic monitor.

C)

IISee Special 74 Test Exception 3. 10. 1

/OPCjll~n~ 6fgcrn~ gpAocf og ~oniyori a 'Abs uu%w~~ I OgeC tmf (CnQvf~ ig CohS ~

g~nc( fo A'eg f Ais ~/K(I~~,

TABLE 4.3.7.5-1 ACCIDENT HONITORING INSTRllMEHTATION SURVEILLANCE RE UIREHEATS CHANNEL CHANNEL INSTRUMENT CHECK CALIBRATIOH

l. Reactor Vessel Steam Dome Pressure " H R
2. Reactor Vessel Water Level H R
3. Suppression Chamber Mater Level H R
4. Suppression Chamber Mater Temperature'.

H R Suppression Chamber Air Temperature M R

6. Primary Containment Pressure H R
7. Drywell Temperature H R
8. Drywell Oxygen/Hydrogen Analyzer~ H Q*
9. Safety/Relief Valve Position Indicators H R
10. Containment High Radiation H R ll. Noble gas monitors
a. Reactor Bldg. Vent
b. SGTS Vent H R
c. Turbine Bldg. Vent H R
12. Neutron Flux M R

(~e coy the peeplee e/ +<ee~ eel~)

or hydrogen ana yzer~ use sample gas containing:

a. Nominal zero volume 'percent hydrogen, balance nitrogen.
b. Nominal thirty volume percent hydrogen, balance nitrogen.
  • "CHANNEL CALIBRATION shall consist of an electronic calibration of the channel, not including the detector, for range decades above 10 R/hr and a one point calibration check of the detector below 10 R/hr with an .

installed or portab'le gamma source. e W g$ ykc ]prylan/p~ a(per/pnfg nerf gs king ccfi(i+Mz ~n 4Pftep're@ 6' @ +t ~ ~n Q~jrrr~

CM<dC CqCrg&rro& ggrp(/ de yCrfir~eg P +h. lire'+ 4reg~rr-J

TABLE 3.3.7.5-1 ACCIDENT HOHI TOR ING IHSTRUHENTATION MINIHlJH APPLICABLE REQUIRED NUHBER CHANNELS OPERATIONAL INSTRUHENT OF CHANNELS OPERABLE ACTION CONDITIONS

1. Reactor Vessel Steam Dome Pressure 80 1, 2
2. Reactor Vessel Water Level 80 1, 2
3. Suppression Chamber Mater Level 80 1, 2
4. Suppression Chamber Mater Temperature 8, 6 locations 6, 1/location 80 1, 2
5. Suppression Chamber Air Temperature 2 1 80 1, 2
6. Primary Containment Pressure 2/range 1/range 80 1, 2
7. Drywell Temperature 2 1 80 1, 2
8. Orwell Gaseous Analyzer
a. Oxygen W 82 1,¹ 2¹ cS:A
b. Hydrogen 2 82 1,¹ 2¹
9. Safety/Relief Valve Position Indicators 1/val ve" 1/valve" 80 1, 2
10. Containment High Radiation 81 1, 2 ll. Noble gas monitors*"
a. Reactor Bldg. Vent 81 1, 2 and"""
b. SGTS Vent 81 2 and%**
c. Turbine Bldg. Vent 1 81 1, 2 and"""
12. Primary Containment Isolation Valve Position 1/valve 1/valve 80 1, 2
13. Neutron Flux 80 1, 2 "Acoustic monitor.

""Hid-range and high-range channels.

¹See Special Test Exception 3. 10. 1.

j7~(~~ cZ(/CD nok. Ag~ of IhOaefOI'i~ '4tS ~~~~ C~Ce I~P4 ~> IS ~Scan cg Vn/

  • ~<~ ~, reg Ccir~M .

CA CA TABLE 4.3.7.5-1 tll C

ACCIOENT HONITORING INSTRUHENTATION SURVEILLANCE RE UIREHENTS CHANNEL CHANNEL IRSTRUHEHT CHECK CALIBRATION Reactor Vessel Steai Oome Pressure R

2. Reactor Vessel Mater Level R
3. Suppression Chamber Mater Level R
4. Suppression Chamber Mater Teimperature R
5. Suppression Chamber Air Temperature R
6. Primary Containment Pressure R GP
7. Orywell Temperature a R C
8. Orywell Oxygen/Hydrogen Analyzer ~ qA Ca) 9. .Safety/Relief Valve Position Indicators R
10. Containment High Radiation R**

Noble gas monitors a.. Reactor Bldg. Vent R

b. SGTS Vent R
c. Turbine Bldg. Vent R
12. Primary Containment Isolation Valve Position NA
13. Neutron Flux R (lsg,f gyt fgc, )ref (cHlh+4 l~A+ wA~ocif ER
  • For hydrogen analyzer P use sample gas containing:
a. Nominal zero volume percentt hydrogen, balance nitrogen.
b. Nominal thirty volume percent hydrogen, balance nitrogen.
  • "CHANNEL CALIBRATION shall consist of an electronic for range decades above 1O R/hr and a one point calibration calibration of the channel, not including the detector, check of the detector below 1O R/hr>>th an installed or portable gamma source.

~~~/<<,g 4yccag87roJ

~(qc

>A~/I ke 1 ye ~c.~

erfor~g ol ss kc<~ ST'Rl<W t/Te w ~pn~r~

/isles'l'eg~~Ees .

Ch4~nfdc. avEcK ~ A, ~~p<i~

~ Ct)

C CA AD TABLE 3.3.7.5-1 m

ACCIDENT HONITORING INSTRUMENTATION INSTRUHENT

~ REQUIRED NUMBER OF CHANNELS HINIHUM CHANNELS OPERABLE ACTION APPLICABLE OPERATIONAL CONDITION

~

Reactor Vessel Steam Domo Pressure 2 l

80 1, 2

2. Reactor Vessel Mater Level 80 )lq 2
3. Suppression Chamber Mater Level 2 1 80 1, 2
4. Suppression Chamber Mater Temperature 8, 6 locations 6, 1/location 80 1 2 Suppression Chamber Air Temperature 2 1 80 .1, 2
6. Primary Containment Pressure 2/range 1/range 80 1, 2
7. Drywell Temperature 2 1 80 1, 2
8. Drywell Gaseous Analyzer
a. Oxygen 288 1 I'III 82 lP, 1H 2h'8,
b. Hydrogen 82 2II'.

2k'/valve"

9. Safety/Relief Valve Position Indicators 1/valve" 80 2
10. Containment High Radiation 1 81 1 2
11. Noble gas monitors""
a. Reactor Bldg. Vent 81 1, 2 and *"*
b. SGTS Vent 81 1, 2 and "**

'1

c. Turbine Bldg. Vent 1 2
12. Neutron Flux 80 1 2 "Acoustic monitor.

"*Hid-range and high-range channels O ""*Mhen moving irradiated fuel in the secondary containment.

DSee Special Test Exception 3. 10.1 CD HThe preplanned alternate method of monitoring this parameter, once implemented, is considered a valid "channel" to meet this requirement.

TABLE 4.3.7.5-l ACCIDENT MONITORING INSTRUMENTATION SURVEILLANCE RE UIREMEATS CHANNEL CHANHEL INSTRUMENT CHECK CALIBRATION

1. Reactor Vessel Steam Dome Pressure R Reactor Vessel Mater Level R
3. Suppression Chamber Mater Level R
4. Suppression Chamber Mater Temperature R
5. Suppression Chamber Air Temperature R
6. Primary Containment Pressure R
7. Drywell Temperature R
8. Drywell Oxygen/Hydrogen Analyzers *
9. Safety/Relief Valve Position Indicators R
10. Containment High Radiation RA%
11. Noble gas monitors
a. Reactor Bldg. Vent
b. SGTS Vent
c. Turbine Bldg. Vent M
12. Neutron Flux M or hydrogen ana yzer~(but not the preplanned alternate method), use sample'as containing':
a. Hominal zero volume'percent hydrogen, balance nitrogen.
b. Nominal thirty volume percent hydrogen, balance nitrogen.

"*CHANNEL CALIBRATION shall consist of an electronic calibration of the channel, not including the detector, for range decades above 10 R/hr and a one point calibration check of the detector below 10 R/hr with an installed or portable gamma source.

8If the preplanned alternate method is being utilized, an appropriate CHANNEL CHECK and an appropriate CHANNEL CALIBRATION shall be performed at the listed frequencies.

O

TABLE 3.3.7.5-1 ACCIDENT HONITORING INSTRUHENTATION HINIHUM APPLICABLE REQUIRED NUHBER CHANNELS OPERATIONAL INSTRUHENT OF CHANNELS OPERABLE ACTION CONDITIONS C

1. Reactor Vessel Steam Dome Pressure 80 1, 2 M
2. Reactor Vessel Mater Level 80 1, 2 tO
3. Suppression Chamber Mater Level 80 1, 2
4. Suppression Chamber Water Temperature 8, 6 locations 6, 1/location 80 1, 2
5. Suppression Chamber Air Temperature 2 1 80 1, 2
6. Primary Containment'Pressure 2/range 1/range 80 1, 2
7. Drywell Temperature 2 1 80 1, 2
8. Drywell Gaseous Analyzer

~

a. Oxygen 2yy 82 l,f 28
b. Hydrogen 2kTI 1H 82 1,8 28
9. Safety/Relief Valve Position Indicators '1/va1 ve" 1/val ve* 80 1, 2
10. Containment High Radiation 2 81 1, 2
11. Noble gas monitors"*
a. Reactor Bldg.- Vent 81 1 2 and*"*
b. SGTS Vent 81 and*A'4
c. Turbine Bldg. Vent 1 1 81 2 and
12. Primary Containment Isolation Valve Position 1/valve 1/valve 80 1, 2
13. Neutron Flux 1 80 1, 2
  • Acoustic monitor.

"*Hid-range and high-range channels.

"*"When moving irradiated fuel in the secondary containment.

gSee Special Test Exception 3.10.1.

HThe preplanned alternate method of monitoring this parameter, once implemented, is considered a valid

" channel" to meet this requirement..

~I

TABLE 4.3.7.5-1 ACCIDENT MONITORING INSTRUMENTATION SURVEILLANCE RE UIREHENTS CHANNEL CHANNEL INSTRUMENT CHECK CALIBRATION

1. Reactor Vessel Steam Dome Pressure H "'R
2. Reactor Vessel Mater Level H R
3. Suppression Chamber Mater Level H R
4. Suppression Chamber Mater Temperature H R

-5. Suppression Chamber Air Temperature H R

6. Primary Containment Pressure M R
l. Drywell Temperature R
8. Drywell Oxygen/Hydrogen Analyzer g H QA'
9. -Safety/Relief Valve Position Indicators
10. Containment High Radiation H R*A'
11. Noble gas monitors
a. Reactor Bldg. Vent H
b. SGTS Vent M
c. Turbine Bldg. Vent H R
12. Primary Containment Isolation Valve Position H NA
13. Heutron Flux H R "For hydrogen analyzer,(but not the preplanned alternate method), use sample gas containi'na; I
a. Hominal zero volume percent hydrogen, balance nitrogen.

-b. Nominal thirty volume percent hydrogen, balance nitrogen.

""CHANNEL CALIBRATION shall consist of an electronic calibration of the channel, not including the detector, for range decades above 10 R/hr and a one point calibration check of the detector below 10 R/hr with an installed or portable gamma source.

glf the preplanned alternate method is being utilize'd, an appropriate CHANNEl CHECK and an appropriate CHANNEL CALIBRATION shall be performed at the listed freauencies.

SSES-FSAR recombiners are located approximately midway between the pedestal and containment wall.

The suppression chamber recombiners both have structures located close to two. of the recombiner ports. Both recombiners have a 42 1-1/2 inch diameter diaphragm slab support column approximately feet from the suction, and a 24 inch beam approximately 6 inches from the 26 inch high discharge.

The hydrogen recombiner is a natural convection, flameless, thermal reactor-type hydrogen/oxygen recombiner. The initiation time for the recombiners is prior to 1.2 days, post-LOCA as shown in Figures 6.2-49, 6.2-50 and 6.2-51. The heat-up time is approximately 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Therefore, recombiner heat-up will begin approximately 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to operation. The recombiner heats a continuous stream of containment atmosphere to a temperature sufficient for recombination of the hydrogen and oxygen,to form water.

The recombination unit consists of an inlet preheater section, a heater-recombination section, and a mixing chamber. The air is drawn into the unit by natural convection via the inlet louvers and passes through the preheater section, which 'consists of a shroud placed around, the central heaters to take advantage of heat conduction through the walls. In this area the temperature of the inlet air is raised. This accomplishes the dual function of increasing the system efficiency and of evaporating any moisture droplets which may be entrained in the air. The warmed air then passes through the flow orifice which has been specifically sized to regulate the airflow through the unit.

After passing through the orifice plate, the air flows vertically upward through the heater section, where its temperature is raised to the range of 1150-1400 F, causing recombination of H2 and 02 to occur. The recombination temperature is approximately 1135~8. The heater section consists of five banks of electric heaters stacked vertically. Each bank contains 60 individual U-type heating elements.

Next, the air rises from the top of the heater section and flows into the mixing chamber, which is at the top of the unit. Here, the hot air is mixed with the cooler containment air to discharge it back into the containment at a lower temperature.

containment air enters the mixing chamber through the The cooler lower part of the upper louvers located on three sides of the unit."

Table 6.2-18 gives the design characteristics of the hydrogen iecombiner.

Rev. 36, 07/85 6.2-71

EO" 200-103 Reiision 0 Page 17 of 33 PC/P-4 IF: 0 H2 CONCENTRATION > 3% BY VOLUME OR 24 HOURS HAS ELAPSED SINCE 1.72 PSIG SIGNAL, THEN: START H2 RECOMBINERS IAW OP-273"001 RUN DW COOLERS IN SLOW IAW ES-234-001 This step becomes effective when read and remains effective until flowchart exited. Ignition of combustible gases (hydrogen and oxygen) could result in significant containment pressure transients, leading to containment failure. This Will not occur if containment hydrogen concentration is maintained below 4%.

Therefore, start hydrogen recombiners at 3% concentration. Run drywell coolers in slow to avoid pockets with high hydrogen concentrations. Start both systems also after 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> has elapsed from receipt of LOCA signal to counteract buildup of combustible gas due to radiolysis. Secure hydrogen recombiners prior to initiating containment sprays.

pc/p-5 REDUCE PC PRESSURE USING:

(PC/P-1) o SBGT IAW ON-234-001, ONLY WHEN DW AND SUPP CHAMBER TEMP < 212 F o RPV DEPRESSURIZATION AND COOLDOWN IAW RPV CONTROL o ES"234-001, BYPASSING DRYWELL COOLING'OGIC ISOLATIONS Reduce containment pressure using listed procedures. These procedures account for 1.72 psig isolations. Initiate RPV depressurization and cooldown'in accordance with E0-200-102, RPV Control, performed concurrently with this procedure.

Use SBGT only if primary containment temperatures are below 212~F:

If temperature is above 212 F, steam may be admitted to containment. Continued use of SBGT would eventually reduce containment's non-condensible air mass and prevent using drywell sprays.

pc/p-e BEFORE DW OR SUPP CHAMBER PRESSURE REACHES 0 PSIG, TERMINATE PRESSURE REDUCTION This step becomes effective when read and remains effective until flowchart exited. It gives appropriate time to stop pressure reduction, whatever means employed (i.e. SBGT or sprays). Stop pressure reduction at this point to prevent containment failure on negative pressure.

0 RRC LIMITS EXPERIMENT FLAMMABLE PETONABL AIR NON-FLAMMABLE

$ % O~

20 Figure 1. COMBUSTION CHARACTERISTICS OF H> IN AIR AND STEAM

Q

~ ~

C NONFLAMMABLE 40 COMBUSTIBLE . 0 30 02 AIR INERT RAOIOLYSIS METAL-WATER RECOMBINATION Figure 2 MITIGA TION OF DEGRADED CORE EN VIRONMENTBY RECOMBINATION

4 TOTAL RADIOLYSIa 150 4

W 4

4, 4 '100 IL R

8 4.

X O~yy e~ Priul~eed S

(Ih-<<le)

METALWATER REACTION PlUS INITIALHYDROGEN 10 20 TIME AFTER LOCA IDAYSI Rev. 35 07 84 SUSCNEHANNA STEAN ELECTRIC STATION UNITS 1 AND 2 FINAL SAFETY ANALYSN REPORT INTEGRATED PRODUCTION OF HYDROGEN VS. TIME AFTER LOCA FIGURE 6. 2-4.8

I 8

C1 N CCI I

C IV~JAXO p N3008OAHLNBQBBdBWllOA Rev. 35 07/84~

SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1 AND 2 FINAL SAFETY ANALYSIS REPORT HYDROGEN CONCENTRATION IN THE.DRYNELL VS. TIME AFTER LOCA (SHORT TERM)

BOURS "6'2-50

I 1? F 1 ~ ATTACQIENT 6 I COIIThISKHT HYOROGEN MONITOR I

A continuous.'fndication of hydrogen concentration in the containment atjaosphcrc shall be provided in the control rooa. Hcasurcacnt capability shall bc provided over the range of 0 to 10K hydrogen concentration under both positive and negative aablent pressure.

Cha s to Prevfous R ufreaents and Guidance Regulatory Gufde 1.9>, Rev. 2 was referenced in the October 30, 1979 letter as the guide for the design and qualification crfterfa for the contafnecnt hydrogen monitor. However, there have been aany changes aade to this proposed revision and ft has not yet been sade ffw.'.. Therefore, the appropriate sections of ttw latest version of Regulatory Guide 1.97 have been added to this letter (Appendix A) and, therefore, this fs to be considered a ncw rcqufreeent.

The f~ltaentatfon date has been changed due to cqufpoent procurcacnt probleas.

The new fepleaentation schedule is intended to allow licensees enough tiae to coeplete design modifications with a afnfaua nueber of plant shutdowns.

Clarification (1) . Design and qual ifIcitfon crfterfa are outlined fn Appendix A.'2)

Ttw continuous fr.)ication of hydrogen concentration Is not required during noraal operation.

lf an fndfcatfon fs not available at all tfees, continuous indicatfon and recording shall be functioning within 30 afnutes of the initiation of safety infection.

(3) Ttw accuracy and placeeent of the hydrogen eonftors shall be provided and

)ustified to be adequate for their intended functfon.

Tt:: wqufrccwnt applies to alt operatfng reactors and all applicants for operating licenses.

I lceentatfon For operating reactors, desfgn aodfffcatfons should be coapleted by January 1, 1982.

Operating license applicants with an operating license date before January 1, 1982 est have design changes coapleted by January 1, 1982, whereas those applicants with license dates past January 1, 1982 aust have all design oodfff-catfons coapletcd before they can rccefve their operating license.

3-111

1 It tl a

  • ~